CITY OF FAIRFIELD
CITY COUNCIL
MEETING AGENDA
Tuesday, October 20, 2026, 6:00 p.m.
Harry T. Price Memorial Council Chamber
1000 Webster Street, Fairfield, CA 94533 or Via Zoom
Notice to Public
The City of Fairfield is committed to providing meeting facilities that are accessible to persons with disabilities and/or have language barriers. To request meeting materials in alternative formats, or to request a sign language interpreter, realtime captioning, or other accommodation, please contact the City Clerk's Office, at least 72 hours in advance of the meeting at (707) 428-7400.
For individuals with hearing or speaking limitations, dial 711 or (800) 735-2922 (English). For Spanish, Tagalog or other language, please dial (800) 855-3000 and provide the communication assistant with the following City telephone number: (707) 399-4010. Additionally, individuals may follow the meeting with our transcription application tool at www.fairfield.ca.gov/speech.
DISCLOSURE OF CAMPAIGN CONTRIBUTIONS:
Pursuant to Government Code 84308, City Council Members are disqualified and not able to participate in any agenda item involving contracts (other than competitively bid, labor, or personal employment contracts), franchises, discretionary land use permits and other entitlements if the City Council Member received more than $250 in campaign contributions from the applicant or contractor, an agent of the applicant or contractor, or any financially interested participant who actively supports or opposes the City's decision on the agenda item in the 12 months prior to the date the item is on the agenda. Members of the City Council who have received, and applicants, contractors or their agents who have made, campaign contributions totaling more than $250 to a City Council Member in the 12 months prior to the date the item is on the agenda are required to disclose that fact for the official record of the subject proceedings. Disclosures must include the amount of the campaign contribution and identify the recipient City Council Member and may be made either in writing to the City Clerk before the agenda item or by verbal disclosure during consideration.
Members of the public can observe the meeting on Roku City of Fairfield, Xfinity Channel 26, AT&T U-Verse Channel 99, and web streamed live at www.youtube.com/FFCATV. The public may join the meeting via Zoom at: https://fairfield.ca.gov/zoomcitycouncil or via phone (408) 638-0968, Webinar ID: 814 7538 5275, Passcode: 7074287400
Pages
A. CALL TO ORDER 6:00 PM
B. ROLL CALL
Councilmember Doug Carr
Councilmember Doriss Panduro
Councilmember Manveer Sandhu
Councilmember Scott Tonnesen
Councilmember K. Patrice Williams
Vice Mayor Pam Bertani
Mayor Rick Vaccaro
C. INVOCATION - Anubha Gupta, Soumya Vemparala, and Madhavi Prabhakar of the Bharatiya Heritage Foundation
D. PLEDGE OF ALLEGIANCE
E. COUNCIL REPORTS
F. CITY MANAGER'S REPORT
G. CITY ATTORNEY'S REPORT
H. CITY CLERK'S REPORT
I. PRESENTATIONS
I.1 Proclamation and Poem Celebrating Diwali Festival of Lights Presented by Councilmember Manveer Sandhu and Poet Laureate Michael Wyly I.2 Proclamation Declaring Filipino American Heritage Month Presented by Mayor Rick Vaccaro
I.3 Proclamation Recognizing Ball Corporation's 50th Anniversary Presented by Councilmember Doriss Panduro
I.4 Visit Fairfield Update Presented by Anand Patel, President/CEO J. PUBLIC COMMENTS
Persons wishing to address the City Council on subjects not on the agenda but within the jurisdiction of the council may do so at this time. The council cannot discuss or take action on matters, not on the agenda for this meeting, but councilmembers may briefly respond to statements made or questions raised by the public, ask for clarification from staff, refer the matter to staff, request staff to report back to the council at a subsequent meeting, or place the matter on a future agenda. To speak on an agenda item, please use the “raise your hand” feature or press *9 on your phone. Speakers are limited to three minutes per item, as determined by the mayor.
K. CONSENT CALENDAR
All matters listed on the Consent Calendar are to be approved with one motion unless a member of the City Council or the public requests that separate action be taken on a specific item.
Recommended Action:
To approve the consent calendar.
K.1 CM Approval of Meeting Minutes for September 2026 10 Approval of Meeting Minutes for September 2026
Funding Source: N/A
Contact: Karen Rees, (707) 428-7767
Recommended Action:
Approve the meeting minutes.
K.2 Resolution 2026-195 PW Deal Points in Advance of Supplemental Memorandum of Understanding
26 Approving Deal Points in Advance of a Supplemental Memorandum of Understanding for the North Bay Regional Water Treatment Plant Joint Exercise of Powers Agreement
Funding Source: N/A
Contact: Michael Hether, (707) 428-7493
Recommended Action:
Adopt resolution.
K.3 Resolution 2026-196 PW Initial Study/Mitigated Negative Declaration for the North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works Project
84 Adopting the Initial Study/Mitigated Negative Declaration for the North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works Project Funding Source: N/A
Contact: Michael Hether, (707) 428-7493
Recommended Action:
Adopt resolution.
K.4 Resolution 2026-197 PW Vanden Road Widening Phase 1 Design 897 Authorizing the City Manager to Execute a Professional Services Agreement with Carlson, Barbee & Gibson, Inc. to Provide Engineering Design Services for the Vanden Road Widening Improvements Project (Jepson Parkway Segment 17A, 17B, and 18) Phase 1 Embankment, and Authorizing an Update to the Fiscal Year 2026-2027 Budget and 5-Year Capital Improvement Plan Funding Source: $350,000 ($233,333, Northeast Transportation Fund; $116,667, Capital Street Funds Assembly Bill 1600 Streets Fund) Contact: Ryan Panganiban, (707) 428-7017
Recommended Action:
Adopt resolution.
K.5 Resolution 2026-198 PW Fiscal Year 2025-2026 Low Carbon Transit Operations Program Grant Allocation Acceptance
918
Authorizing the Acceptance of the Fiscal Year 2025-2026 Low Carbon Transit Operations Program Cycle A and Cycle B Grant Allocations from the Greenhouse Gas Reduction Fund for the City of Fairfield Corporation Yard Transit Electrification Project – Phase 1B
Funding Source: N/A
Contact: Melissa Minton, (707) 434-3804
Recommended Action:
Adopt resolution.
K.6 Resolution 2026-199 PW Amendment No. 1 to the Routing Company Technology Software-as-a-Service Agreement
923
Authorizing the City Manager to Execute Amendment No. 1 to the Technology Software-as-a-Service Agreement for On-Demand (Microtransit) and In-Advance (Paratransit) Scheduling, Dispatch, and Management Software between the City of Fairfield and the Routing Company
Funding Source: $85,000; Transit FAST Connect/FAST Connect Americans with Disabilities Act Fund
Contact: Melissa Minton, (707) 434-3804
Recommended Action:
Adopt resolution.
K.7 Resolution 2026-200 PW Increase Fuel Purchase Authorization 1051 Authorizing an Increase of the Purchase Amount for the Provision and Delivery of 87 Octane Gasoline and Renewable Diesel from Pinnacle Petroleum, Inc at the City of Fairfield’s Corporation Yard
Funding Source: $1,3000,000; Fleet Management Fund
Contact: David Renschler, (707) 428-7414
Recommended Action:
Adopt resolution.
K.8 Resolution 2026-201 PW Replacement Fixed-Route Transit Vehicle Purchase 1121 Authorizing the City Manager to Purchase Two Replacement Vehicles for Fixed Route Transit Operations
Funding Source: N/A
Contact: David Renschler, (707) 428-7414
Recommended Action:
Adopt resolution.
K.9 Resolution 2026-202 PW Purchase and Install Shop Doors for Fleet 1125 Authorizing the City Manager to Purchase Replacement Shop Doors for the Public Works Fleet Maintenance Shop
Funding Source: $210,781; Public Works Fleet Fund
Contact: David Renschler, (707) 428-7414
Recommended Action:
Adopt resolution.
K.10 Resolutions 2026-203 and 2026-204 PW Additional Funding for Shaw Kawasaki Architects for Fire Station 36 and Additional Funding for Shaw Kawasaki Architects for Fire Station 39
1129
Resolution 2026-203 Authorizing the City Manager to Execute Amendment No. 7 to the Professional Services Agreement for Architectural Design Services with Shaw Kawasaki Architects for Fire Station 36; and
Resolution 2026-204 Authorizing the City Manager to Execute Amendment No. 4 to the Professional Services Agreement for Architectural Design Services with Shaw Kawasaki Architects for Fire Station 39
Funding Source: $133,032 ($68,506, CFD 3; $64,526, CFD 2023-1) Contact: Ryan Panganiban, (707) 428-7017
Recommended Action:
Adopt resolutions.
K.11 Resolution 2026-205 PW Increasing Authorization and Change Order Authority for West Texas Street Complete Streets Project
1237
Increasing Budget Authorization and Change Order Authority for West Texas Street Complete Streets Project
Funding Source: $677,714 ($340,669, Senate Bill 1; $337,045, State Grant [Active Transportation Program])
Contact: Ryan Panganiban, (707) 428-7017
Recommended Action:
Adopt resolution.
K.12 Resolution 2026-206 CD SCI Consulting Group Consultant Services Agreement Renewal
1242
Authorizing the City Manager to Execute a Consultant Services Agreement Renewal with SCI Consulting Group for Cannabis Program Compliance Inspections, Financial Audits, Annual Renewals, and Related Services Funding Source: $30,000; General Fund
Contact: Keisha Mamaril, (707) 428-7039
Recommended Action:
Adopt resolution.
K.13 Resolution 2026-207 FN Budget Adjustment for Building Repairs and Maintenance for Dickson Hill Storage
1281
Approving Supplemental Appropriation for Building Repairs and Maintenance for Dickson Hill Storage for Fiscal Year 2026-2027 and Authorizing an Update to the Fiscal Year 2026-2027 Budget
Funding Source: $20,000; Central Stores Fund
Contact: Nicole Simmons, (707) 428-7624
Recommended Action:
Adopt resolution.
K.14 Resolution 2026-208 ITCybersecurity Purchase with ePlus 1285 Approving Purchase for Security Information and Event Management Software and Security Operations Center Services with ePlus, Inc. and Authorizing an Update to the Fiscal Year 2026-2027 Budget
Funding Source: $980,048; Computer Fund
Contact: Naveed Ashraf, (707) 428-7582
Recommended Action:
Approve resolution.
K.15 Resolution 2026-209 HD Authorization to Submit HCD Application to Approve Expenditure of HOME Program Income Funds and to Designate the Mayor with Signing Authority
1291
Authorizing the Submittal of an Application to the California Department of Housing and Community Development (HCD) for Authority to Expend HCD HOME Program Income, Recaptured Funds, and Program Income Administrative Funds (hereinafter collectively “PI Funds”) Under the HOME Investment Partnerships Program (HOME); and, if Approved, the Execution of a Standard Agreement, any Amendments Thereto, and of any Related Documents Necessary to Participate in the HCD HOME Program
Funding Source: $957,500; HOME Program Income
Contact: Willie Daniels, (707) 428-7647
Recommended Action:
Adopt resolution.
K.16 Resolution 2026-210 PD Approving Contract with Needle, Inc. (DBA Aurelian) 1297 Authorizing the City Manager to Enter into a Contract with Needle, Inc. (DBA Aurelian) for Public Safety Answering Point Call Taker Software
Funding Source: $603,821; General Fund
Contact: Johnathan Reed, (707) 428-7513
Recommended Action:
Adopt resolution.
K.17 Resolution 2026-211 PD Approving Acceptance of the Selective Traffic Enforcement Program (STEP) Grant Program 2026-2027
1311
Approving Acceptance of the California Office of Traffic Safety 2026-2027 Selective Traffic Enforcement Program (STEP) Grant and Approval of Activities to Reduce Traffic Collisions and Fatalities Due to Unsafe Driving Funding Source: N/A
Contact: Dan Marshall, (707) 428-7374
Recommended Action:
Adopt resolution.
K.18 Resolution 2026-212 PD Accepting and Appropriating of a $20,000 Donation from the Syar Foundation to Purchase a Police Canine
1338
Authorizing the Accepting and Appropriating of a $20,000 Donation from the Syar Foundation to Support the Purchase of a Police Canine and Authorizing an Update to the Fiscal Year 2026-2027 Budget
Funding Source: $20,000; Special Programs Fund
Contact: Dan Marshall, (707) 428-7374
Recommended Action:
Adopt resolution.
L. NEW BUSINESS
L.1 CM Minute Action Approving the Mayor’s Appointments 1342 Minute Action Approving Mayor’s Appointment to the Planning Commission and the Youth Commission
Funding Source: N/A
Contact: Karen Rees, (707) 428-7767
Recommended Action:
Approve appointments. Perform oath of office.
L.2 Resolution 2026-213 FD EMS Division Positions 1344
Authorizing Additional Positions and Amending the Fiscal Year 2026-2027 Position Control for the Fire Department's Emergency Medical Services Division to Support Administration of the Solano County Exclusive Operating Area Contract for Emergency Ambulance Transport Services, Establishing a New Job Classification, and Authorizing an Update to the Fiscal Year 2026-2027 Budget
Funding Source: $496,394; General Fund and Annually $855,989; EMS Admin Fee
Contact: Rich Llewellyn, (707) 436-7226
Recommended Action:
Adopt resolution.
L.3 Resolution 2026-214 and Ordinance 2026-07 FD Non-Emergency Lift Assistance Fee for Licensed Care Facilities
1350
Resolution 2026-214 Establishing a Non-Emergency Lift Assistance Fee for Licensed Care Facilities Pursuant to Chapter 17B of the Fairfield Municipal Code; and
Ordinance 2026-07 Adding Chapter 17B to the Fairfield Municipal Code to Establish a Fee for Non-Emergency Lift Assistance at Licensed Care Facilities Funding Source: N/A
Contact: Rich Llewellyn, (707) 436-7226
Recommended Action:
Adopt resolution, waive full reading, read by title only, and introduce ordinance for first reading.
M. PUBLIC HEARINGS
M.1 Resolutions 2026-215 and 2026-216 HD Community Development Block Grant (CDBG) Fiscal Year 2027-2032 Consolidated Plan Priorities and Goals and Amendment to the CDBG Citizen Participation Plan
1362
Resolution 2026-215 Approving the Fiscal Year 2027-2032 Community Development Block Grant Five-Year Consolidated Plan Priorities and Goals; and Resolution 2026-216 Approving the Amendments to the Community Development Block Grant Program Citizen Participation Plan Funding Source: N/A
Contact: LaTanya Terrones, (707) 428-7454
Recommended Action:
Hold a public hearing and adopt resolutions.
M.2 Resolution 2026-217 CD Surplus Land 3365 N Texas Street 1479 Declaring Certain Real Property Owned by the City of Fairfield as Surplus Land Funding Source: N/A
Contact: Jennifer Rice, (707) 428-7727
Recommended Action:
Adopt resolution.
M.3 Resolutions 2026-218 and 2026-219 PW Annexing Territory and Declaring 1485
Results
Resolution 2026-218 Annexing Territory (Horizon Self Storage) to Community Facilities District No. 2012-2 (Public Safety Services, Open Space Operation, and Park Maintenance), as Annexation No. 73, Authorizing the Levy of a Special Tax Within the Annexed Territory, and Submitting Levy of a Special Tax to Qualified Electors Thereof; and
Resolution 2026-219 Declaring the Results of a Special Annexation Election in Territory Annexed to Community Facilities District No. 2012-2 (Public Safety Services, Open Space Operation, and Park Maintenance), Determining the Validity of Prior Proceedings, and Directing Recording of Amended Notice of Special Tax Lien for City of Fairfield Community Facilities District No. 2012-2 (Public Safety Services, Open Space Operation, and Park Maintenance) Annexation No. 73 (Horizon Self Storage)
Funding Source: N/A
Contact: Valerie Standfill, (707) 428-7055
Recommended Action:
Hold public hearing and adopt resolutions.
N. ADJOURN
ADJOURN TO TUESDAY, NOVEMBER 17, 2026, 6:00 P.M., HARRY T. PRICE MEMORIAL COUNCIL CHAMBER.
Any disclosable public records related to an open session item on a regular meeting agenda and distributed by the City of Fairfield to all or a majority of the Fairfield City Council less than 72 hours prior to that meeting are available for public inspection at City Hall, in the 4th floor lobby, 1000 Webster Street, Fairfield, California during normal business hours.
PUBLIC NOTIFICATION
I, Esther Beavers, Deputy City Clerk, do hereby certify that I have caused a true copy of the above notice and agenda to be delivered to each of the members of the Fairfield City Council, at the time and in the manner prescribed by law and that this agenda was posted at City Hall, 1000 Webster Street, Fairfield, California on Thursday, October 15, 2026.
Agenda Item No: K.1
AGENDA REPORT
DATE: October 20, 2026
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: CM Approval of Meeting Minutes for September 2026 Funding Source: N/A
Contact: Karen Rees, (707) 428-7767
RECOMMENDED ACTION
Approve the meeting minutes.
STATEMENT OF ISSUE
Minutes need approval by the City Council.
DISCUSSION
The City Council Minutes for September 2026 have been approved by the city attorney and need council approval.
FINANCIAL IMPACT
N/A
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The council may choose to modify the minutes, which will result in bringing this item back at a future date.
COORDINATED WITH
City Attorney’s Office
STAFF CONTACT
Esther Beavers, Deputy City Clerk
(707) 428-7402
[email protected]
ATTACHMENTS
Attachment 2: 2026-09-01 Closed Session Minutes
Attachment 3: 2026-09-01 City Council Minutes
Attachment 4: 2026-09-03 Special Closed Session Minutes Attachment 5: 2026-09-15 City Council Minutes
1 CITY OF FAIRFIELD
CLOSED SESSION MEETING
MINUTES
TUESDAY, SEPTEMBER 1, 2026; 5:00 PM
CITY MANAGER’S OFFICE CONFERENCE ROOM
1000 WEBSTER STREET, 4TH FLOOR, FAIRFIELD, CA 94533
OR VIA ZOOM
Councilmember Doriss Panduro will be attending remotely via Zoom. Teleconference location (Gov’t Code 59453 (b)) 686 Anton Blvd., Costa Mesa CA 92626. ***Open to the Public*** Councilmember Doug Carr will be attending remotely via Zoom. Teleconference location (Gov’t Code 59453 (b)) 2500 E. 2nd St., Reno, NV 89595. ***Open to the Public*** The public may join the meeting via Zoom at https://fairfield.ca.gov/zoomclosedsession or via phone (408) 638-0968, Meeting ID: 827 2363 4960, Passcode: 02110527
CALL TO ORDER
Mayor Vaccaro called the meeting to order at 5:00 p.m. City Attorney David Lim called roll.
Councilmember Doug Carr - Present (Zoom)
Councilmember Doriss Panduro - Present (Zoom)
Councilmember Manveer Sandhu - Present via Zoom
Councilmember Scott Tonnesen - Present
Councilmember K. Patrice Williams - Present
Vice Mayor Pam Bertani - Present
Mayor Rick Vaccaro - Present
PUBLIC COMMENTS
There were no public comments.
The City Council went into closed session on the following items with the listed people present:
F. CONVENE JOINT MEETING OF THE CITY COUNCIL AND HOUSING AUTHORITY G. JOINT CITY COUNCIL AND HOUSING AUTHORITY
G.1 Conference with Real Property Negotiators (Government Code 54956.8) Property: 421 Madison St. (City of Fairfield) - APN: 0030-275-010 Agency negotiator(s): David Gassaway, La Tanya Terrones Negotiating parties: Northbay Healthcare
Under negotiation: Consideration of Letter of Intent from Negotiating Parties Contact: David Lim, (415) 421-8484
2 Present were City Attorney David Lim, Assistant City Manager Farbod Pirouzmand (Zoom), Finance Director John Furtado, and Acting Housing Director LaTanya Terrones.
G.2 Conference with Real Property Negotiators (Government Code 54956.8) Property: 421 Madison St. (City of Fairfield) - APN: 0030-275-010 Agency negotiator(s): David Gassaway, La Tanya Terrones Negotiating parties: Northbay Healthcare; Prodigy Properties, LLC Under negotiation: Consideration of Letter of Intent from Negotiating Parties Contact: David Lim, (415) 421-8484
Present were City Attorney David Lim, Assistant City Manager Farbod Pirouzmand (Zoom), Finance Director John Furtado, and Acting Housing Director LaTanya Terrones.
H. RECONVENE MEETING OF THE CITY COUNCIL
I. PRESENTATIONS
I.1 Conference with Labor Negotiator (Gov’t Code 54957.6) Agency Designated Representative: Farbod Pirouzmand
Employee Organization: Fairfield Professional Firefighters Association (Local 1186) Contact: David Lim, (415) 421-8484
Present were City Attorney David Lim, Assistant City Manager Farbod Pirouzmand (Zoom), and Finance Director John Furtado.
The City Council came out of closed session. The City Attorney reported out verbally the results of propery negotiations for 421 Madison St.
Mayor Vaccaro adjourned the meeting at 5:30 p.m.
______________________________
City Attorney
________________________________
Mayor
1 CITY OF FAIRFIELD
CITY COUNCIL MINUTES
September 1, 2026, 6:00 p.m.
Harry T. Price Memorial Council Chamber
1000 Webster Street, Fairfield, CA 94533 or Via Zoom
_____________________________________________________________________ A. CALL TO ORDER 6:00 PM
Mayor Rick Vaccaro called the meeting to order at 6:00 p.m.
B. ROLL CALL
On roll call were Councilmembers Doriss Panduro (online), Manveer Sandhu, Scott Tonnesen, and K. Patrice Williams, Vice Mayor Pam Bertani, and Mayor Rick Vaccaro.
Councilmember Doug Carr was absent.
C. INVOCATION - Pastor Christian Bravo of Liberty Church Pastor Christian Bravo of Liberty Church gave an invocation.
D. PLEDGE OF ALLEGIANCE
Councilmember Sandhu led the Pledge of Allegiance.
E. COUNCIL REPORTS
Councilmember Williamsreported that she attended the inaugural Women’s Equality Day Luncheon at Jelly Belly on August 21, hosted by Friends of the Solano Commission for Women and Girls. The keynote speaker was Rami Muth, co-president of the League of Women Voters of Solano County and a retired school district superintendent. The luncheon commemorated 100 years since the passage of the 19th Amendment and recognized the impact of the Voting Rights Act of 1965.
Councilmember Williams also read a statement condemning online and in-person racist bullying targeting her and other women leaders and elected officials of color.
Councilmember Tonnesen stated that he had kept busy over the past two weeks. He and Councilmember Carr attended the free screening of Hamilton on August 28 at Mankas Park as part of Fairfield Parks & Recreation’s Summer Movies & Food Trucks series.
He also attended the 19th annual Prime Rib in the Park, a community fundraiser hosted by the Fairfield Host Lions Club at McNaughton Park to benefit the Fairfield Police
2 Activities League (PAL). He thanked Nancy Meadows for helping to coordinate the event for many years and noted that this was her final year leading the effort.
Councilmember Tonnesen commented on the ongoing road construction downtown, acknowledging that while the work has been frustrating, it will ultimately be worth it. He also shared that a new coffee shop and a new breakfast restaurant, Shells, are coming to downtown Fairfield.
Councilmember Panduro reported that she enjoyed seeing everyone, especially the youth from the Police Activities League (PAL), at the Prime Rib in the Park event. The PAL students were recognized for their hard work throughout the past year and also helped serve the meal.
She was pleased to attend the Women’s Equality Day Luncheon, particularly as a former commissioner for the Solano Commission for Women and Girls. She appreciated the opportunity to see so many powerful women in attendance and celebrate their contributions to the community.
Lastly, she attended the League of California Cities North Bay Division meeting at American Canyon City Hall, where representatives from Marin, Solano, Napa, and Sonoma Counties gathered. Each representative discussed the impacts of House Resolution 1 (HR 1) on their respective cities.
Vice Mayor Bertani thanked the Rolling Hills Neighborhood Network for hosting a general meeting. She also thanked Police Chief Dan Marshall and Fire Chief John Sturdee for providing updates to the residents at that meeting on the Police and Fire Departments, including the use of Measure P funds. She shared that attendees appreciated the information provided.
Mayor Vaccaro invited former Councilmember Matt Garcia’s parents, Teresa and Raymond Courtemanch, to the podium and spoke warmly about the lasting impact their son had on the Fairfield community. Marking the 18th anniversary of Matt’s tragic death, Mayor Vaccaro recognized Teresa and Raymond for the meaningful work they continue to do in their son’s name and for keeping his legacy alive through their service to the community.
Mayor Vaccaro also recalled that Matt was the youngest councilmember elected in California at the time, reflecting the remarkable path he had forged at such a young age.
Following his death, former Mayor Harry Price named Matt an honorary Mayor of Fairfield, as he always said he would be Mayor one day! Mayor Vaccaro noted that the entire community was reeling from the devastating loss of a young public servant who had made such a lasting difference. Teresa Courtemanche thanked Mayor Vaccaro and the Council for recognizing Matt and keeping his "Dream Alive!" F. CITY MANAGER'S REPORT
City Manager David Gassaway did not have anything to report.
3 G. CITY ATTORNEY'S REPORT
City Attorney David Lim had nothing to report.
H. CITY CLERK'S REPORT
City Clerk Karen Rees did not have a report.
I. PRESENTATIONS
I.1 Proclamation Declaring the 25th Anniversary of September 11 Presented by Mayor Rick Vaccaro
In honor of the 25th Anniversary of 9/11, Mayor Vaccaro presented a proclamation honoring the lives lost in the September 11, 2001, attacks on our country and recognizing the courageous role of first responders—those who served that day and those who continue to serve our communities. Fire Chief John Sturdee and Police Chief Dan Marshall accepted the proclamation in recognition of the dedication, courage, and sacrifice of first reponders, both past and present.
September 11 is now recognized as National Day of Service and Remembrance.
I.2 Fairfield Community Services Foundation Update Presented by Board Members Jeremy Profitt and Natalie Hicks
Fairfield Community Services Foundation Board Members Jeremy Profitt, Police Services Manager, and Natalie Hicks gave a presentation highlighting the foundation’s work in the community. The Foundation was founded in 1994, and focues on public-private partnerships to support local youth, families, seniors, parks, recreation, and community programs. Council thanked them for the wonderful presentation and for the foundation’s continued work supporting the Fairfield community.
J. PUBLIC COMMENTS
The following individuals spoke during public comments: Jeanie White, Ryan Messano, Nicole Suvaco, Willa Gruver, Alex Hansen, Debbie Toth, Dana Dean, Jay, Dave Harrison, Andrea Lair, Patrick Williams, and Ana Petero.
K. CONSENT CALENDAR
Monica Brown asked for Item K. 3 to be pulled for discussion. Item K.3 pulled and handled separately.
There were no requests to speak on the other items on consent. Councilmember Tonnesen made a motion to approve the consent calendar, excluding Item K.3. Vice Mayor Bertani seconded the motion. By a roll call vote, the motion carried 6-0.
To approve the consent calendar.
K.1 CM Minute Action Displaying the September 11 Flag
4 Approve the minute action.
K.2 Resolution 2026-181 PW Canon Station Planning Area 5 – Neighborhood H, I1 & I2 Subdivision Improvement Agreement
Adopt resolution.
K.3 Resolution 2026-182 PW Lopes Road Construction Management Professional Services Agreement Award with Haley Aldrich
Monica Brown spoke on Item K.3. There were no other requests to speak.
Councilmember Tonnesen made a motion to approve Resolution 2026-182. Vice Mayor Bertani seconded the motion. By a roll call vote, the motion carried 6-0.
Adopt resolution.
K.4 Resolution 2026-183 HD Second Amendment to the City Data Services Professional Services Agreement
Adopt resolution.
K.5 Resolution 2026-184 CD Authorization to Amend Economic Development’s Fiscal Year 2027 Budget 2
Adopt resolution.
K.6 Resolution 2026-185 FD Fire Prevention Reorganization Adopt resolution.
L. ADJOURN
Mayor Vaccaro adjourned the meeting at 7:17 p.m. in honor of former Councilmember and Honorary Mayor Matt Garcia to Tuesday, September 15, 2026, 6 p.m., at the Harry T.
Price Memorial Council Chamber.
Mayor City Clerk
1 CITY OF FAIRFIELD
SPECIAL CLOSED SESSION MEETING
MINUTES
September 3, 2026, 4:30 p.m.
City Manager's Office Conference Room
1000 Webster Street, 4th Floor, Fairfield, CA 94533
_____________________________________________________________________
CALL TO ORDER
Mayor Rick Vaccaro called the meeting to order at 4:30 p.m.
Assistant City Attorney Inder Khalsa called roll.
Councilmember Doug Carr - Present
Councilmember Doriss Panduro - Present
Councilmember Manveer Sandhu - Present
Councilmember Scott Tonnesen - Present
Councilmember K. Patrice Williams - Present via Zoom
Vice Mayor Pam Bertani - Present via Zoom
Mayor Rick Vaccaro - Present
PUBLIC COMMENTS
There were no public comments.
CLOSED SESSION
The City Council went into closed session on the following items with the listed people present.
F. PRESENTATIONS
F.1 Conference with Legal Counsel – Anticipated Litigation (Government Code section 54956.9(d)(2)-(4))
One Potential Case: Settlement negotiations related to Development Agreement between City of Fairfield and Canon Station, LLC/One Lake Housing, LLC and Canon Partners, LLC.
Contact: Assistant City Attorney Inder Khalsa (415) 421-8484 Present were Assistant City Attorney Inder Khalsa, City Manager David Gassaway,
2 Assistant City Manager Farbod Pirouzmand, Community Development and Economic Director David Zellers, Public Works Director Sanjay Mishra (on Zoom).
The City Council Came out of closed session, and no items were reported out.
Mayor Vaccaro adjourned the meeting at 5:55 p.m.
Mayor Assistant City Attorney
1 CITY OF FAIRFIELD
CITY COUNCIL MINUTES
September 15, 2026, 6:00 p.m.
Harry T. Price Memorial Council Chamber
1000 Webster Street, Fairfield, CA 94533 or Via Zoom
_____________________________________________________________________ A. CALL TO ORDER 6:00 PM
Mayor Rick Vaccaro called the meeting to order at 6:00 p.m.
B. ROLL CALL
On roll call were Councilmembers Doug Carr, Doriss Panduro, Manveer Sandhu (online), Scott Tonnesen, and K. Patrice Williams, Vice Mayor Pam Bertani, and Mayor Rick Vaccaro.
C. INVOCATION - Michelle King, M.D. of Freedom from Religion Foundation and the Satanic Temple
Dr. Michelle King of Freedom from Religion Foundation and the Satanic Temple gave an invocation.
D. PLEDGE OF ALLEGIANCE
Councilmember Panduro led the Pledge of Allegiance.
E. COUNCIL REPORTS
Councilmember Williams announced that today, September 15, 2026, is National Voter Registration Day, and organizations across the nation will be participating in a coordinated effort to get eligible citizens registered to vote. She encouraged citizens to register to vote and for others to verify that they are registered. She said democracy works when every eligible voter is informed, registered, and prepared to participate.
Councilmember Tonnesen reported that a new restaurant and bar, Shells, had its grand opening on September 14.They are located at 721 Texas Street in downtown and a new coffee shop named Hustle & Grind will be opening soon in the same area. He read a statement saying that the personal attacks and classless behavior directed at those running for election and at elected officials have gone on long enough. He said such behavior has no place in the Council Chamber, online, or anywhere in our community. He further stated that much of this behavior has been directed at his colleague, Councilmember Williams, and said she deserves to be treated with respect.
2 Councilmember Carr encouraged residents to get out and walk, highlighting the walking path at Octo Soccer Parks. He also agreed with Councilmember Tonnesen’s remarks, stating that personal attacks against any one of them are personal attacks against all of them. He emphasized that people can have opposing views while still treating one another with respect.
Councilmember Panduro reported that she and Councilmember Tonnesen attended the Mexican Fiesta Taco Luncheon on September 10 at the Adult Recreation Center and had a blast, as usual. She noted that the luncheons are only $10 and are a lot of fun, adding that she even led the Macarena dance!
She then thanked Police Chief Dan Marshall and Code Enforcement Officer Minerva Figueroa for attending a North Texas Street Association business meeting to address business owners’ concerns about food pop-ups occurring throughout the city. She said they were able to answer many of the business owners’ questions.
Next, she announced that, as the City of Fairfield’s representative to the Solano County Water Agency, she attended a meeting last week where they received information from the flood monitoring network about the upcoming “super El Niño.” She said the forecast calls for a very rainy winter and that the event is expected to surpass every El Niño on record since 1950. She encouraged residents to prepare now by clearing drains and taking steps to be ready for the wet weather. People can visit www.scwamonitoring.com for real time updates on creek levels, etc.
Vice Mayor Bertani thanked everyone for filling the chamber, noting that meetings are always better when the chamber is full. She announced that the next Fairfield Clergy Action Network (CAN) meeting will be held Tuesday, September 22, at 3 p.m. at the Fairfield Community Center. Members will coordinate the upcoming Thanksgiving meal for people experiencing homelessness on November 24, as well as the Travis Air Force Base Fall Fest, scheduled for October 23 from 11 a.m. to 2 p.m. at TAFB. She concluded by agreeing with her colleagues that hate has no place in Fairfield.
Mayor Vaccaro stated that he stands with his colleagues and emphasized that there is no room for hate in the community. He said the City does not condone personal attacks against councilmembers or other elected officials, whether in person or online. He also spoke about former Councilmember Matt Garcia’s legacy of bringing people together and working collaboratively to make the community a better place. He expressed hope that the community can get back to a place of working together. He reminded residents that October 6 is National Night Out, so there will be no City Council meeting that evening.
Lastly, he stated that it was an honor to present the Harry T. Price Achievement Award at The Leaven Kids Gala to Herm Rowland and the Rowland Family.
Councilmember Sandhu reported that it was a privilege to attend The Leaven’s Kids Annual Gala, which raises funds to support early childhood education, as well as after-school tutoring and mentorship programs in poverty-impacted neighborhoods locally and
3 across the nation. He attended the event, along with Mayor Vaccaro and Police Chief Marshall.
F. CITY MANAGER'S REPORT
City Manager Gassaway reported that the QR codes displayed around the chamber provide access to the City’s live language translation system. By scanning the QR code, attendees can listen to the City Council meeting live in Spanish, Tagalog, or Japanese, in addition to English. More languages will be added in the future.
As today is IT Professionals Day, he also thanked the City’s Information Technology Department staff for their excellent work and for helping keep the City running smoothly.
G. CITY ATTORNEY'S REPORT
City Attorney David Lim had nothing to report.
H. CITY CLERK'S REPORT
City Clerk Karen Rees congratulated the IT Team on IT Professionals Day and said we have the best IT team! She reported that Fairfield Poet Laureate Michael Wyly was unable to attend the meeting tonight.
I. PRESENTATIONS
I.1 Proclamation Declaring National Hispanic Heritage Month Presented by Councilmember Doriss Panduro and Poet Laureate Micheal Wyly Councilmember Panduro presented a proclamation in recognition of National Hispanic Heritage Month to Pastor Christian Bravo and his wife from Liberty Church. National Hispanic Heritage Month is celebrated annually from September 15 through October 15 each year to recognize the culture, history, and contributions of Hispanics and Latinos, who comprise approximately 32 % of Fairfield's population.
I.2 Certificate of Congratulations for Emmanuel Care Center Presented by Mayor Rick Vaccaro
Mayor Vaccaro presented a Certificate of Congratulations to Yesenia Sanchez, Evelyn Lubag, and Joseph, Ricky, and Edith Gonzales of Emmanuel Care Center, celebrating the skilled nursing facility’s recent grand opening at 1244 Travis Blvd.
He also presented a birthday certificate to be given to Angelita Villa, a 104-year-old resident of Emmanuel Care Center. She was not able to attend.
I.3 Homeless Services Division Point in Time Count and End of Year Update Presented by Homeless Services Manager Samantha Burrows Housing Services Manager Samantha Burrows presented a comprehensive report on the Point-in-Time Count and end-of-year update. She answered questions from the City Council, who thanked her for the thorough and informative report.
4 J. PUBLIC COMMENTS
The following individuals spoke during public comments: J.T. Hoyle, Ryan Messano, Keanna P., Vince Guisande, Cruz Avila, Crystal McGee Lee, Jaye, Brenda Nikolai, Shayla Lewellen, George Kennedy, Alicia Minyen, Patrick Williams, Lacey Weber, Robert Myers, and Dana Dean.
After public comment, City Manager David Gassaway provided a brief update on homelessness spending in response to questions raised by the Vice Mayor during Housing Services Manager Samantha Burrows’ report.
Gassaway reported that during Fiscal Year 2024–25, the City of Fairfield spent approximately $2.6 million on homelessness-related services. Of that amount, 34% went to shelter programs, 34% to law enforcement, and 17% to the Public Works Homeless Engagement and Outreach Team (HEART). The remainder supported fire response, street outreach and the Coordinated Entry System (CES).
He noted that the majority of shelter funding came from the City’s General Fund. During that fiscal year, the City also provided $350,000 for the Beck Avenue Project through the Permanent Local Housing Allocation, a state funding program. Gassaway said the City is not funding the project at that level this fiscal year.
He added that once the books are closed for the fiscal year, the City will update and publish the homelessness spending figures.
K. CONSENT CALENDAR
City Attorney Lim announced that Councilmember Sandhu left the meeting (7:02 p.m.).
He was attending online via Zoom.
There were no requests for items on consent to be pulled or for public comment.
Councilmember Tonnesen made a motion to approve the consent calendar. Vice Mayor Bertani seconded the motion. The motion carried unanimously (6-0).
Moved by: Councilmember Tonnesen
Seconded by: Vice Mayor Bertani
To approve the consent calendar.
Motion Carried
K.1 CM Approval of Meeting Minutes for August 2026
Approve the meeting minutes.
K.2 Resolution 2026-186 HD Updating Prohousing Incentive Program (PIP) Allocation
Adopt resolution.
5 K.3 Resolution 2026-187 IT Tyler Technologies Amendment for DigEPlan Services Approve resolution.
K.4 Resolution 2026-188 PW Budget Adjustment for the Parks Capital Projects and Streets Capital Projects Funds
Adopt resolution.
K.5 Resolution 2026-189 PW Matt Garcia Community Park Budget Update Adopt resolution.
K.6 Resolution 2026-190 PW Robbieburr Berger Park Design Amendment Adopt resolution.
K.7 Resolution 2026-191 PW Low or No Emission Grant Program and Bus and Bus Facilities Competitive Program Grant Application
Adopt resolution.
L. NEW BUSINESS
L.1 Resolution 2026-192 PW Annex Territory Horizon Self Storage and Authorize the Levy of Special Taxes
Public Works Director Sanjay Mishra gave a brief presentation. Alicia Minyen spoke on Item L.1.
Councilmember Tonnesen made a motion to approve Resolution 2026-192.
Councilmember Carr seconded the motion. The motion carried unanimously (6-0).
Moved by: Councilmember Tonnesen
Seconded by: Councilmember Carr
Adopt resolution.
Motion Carried
M. PUBLIC HEARINGS
M.1 Resolution 2026-193 HD Fiscal Year 2025-26 Community Development Block Grant (CDBG) Program Consolidated Annual Performance Evaluation Report Management Analyst Miesha Garnett gave a presentation. Mayor Vaccaro opened the public hearing.There were no requests to speak on Item M.1. Mayor Vaccaro closed the public hearing.
Councilmember Carr made a motion to approve Resolution 2026-193.
Councilmember Panduro seconded the motion. The motion carried unanimously (6-0).
6 Moved by: Councilmember Carr
Seconded by: Councilmember Panduro
Hold public hearing and adopt resolution.
Motion Carried
M.2 Resolution 2026-194 HD First Amendment to Fiscal Year 2026-2027 Annual Action Plan
Management Analyst Miesha Garnett gave a presentation. Mayor Vaccaro opened the public hearing.There were no requests to speak on Item M.2. Mayor Vaccaro closed the public hearing.
Councilmember Tonnesen made a motion to approve Resolution 2026-194. Vice Mayor Bertani seconded the motion. The motion carried unanimously (6-0).
Moved by: Councilmember Tonnesen
Seconded by: Vice Mayor Bertani
Hold a public hearing and adopt resolution.
Motion Carried
N. ADJOURN
Mayor Vaccaro adjourned the meeting at 7:55 p.m. to the next scheduled meeting on Tuesday, October 20, 2026, 6 p.m., at the Harry T. Price Memorial Council Chamber.
Just a reminder - there is no meeting on October 6 as it is National Night Out! Mayor City Clerk
Agenda Item No: K.2
AGENDA REPORT
DATE: October 20, 2026
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2026-195 PW Deal Points in Advance of Supplemental Memorandum of Understanding
Approving Deal Points in Advance of a Supplemental Memorandum of Understanding for the North Bay Regional Water Treatment Plant Joint Exercise of Powers Agreement Funding Source: N/A
Contact: Michael Hether, (707) 428-7493
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
The North Bay Regional Water Treatment Plant (NBRWTP) is jointly owned by the Cities of Vacaville and Fairfield but is operated by City of Fairfield staff. Governance, ownership and operation of the NBRWTP is outlined in a Joint Exercise Powers Agreement (JEPA), which was executed in 1987. Both cities are experiencing growth in accordance with their adopted general plans and accordingly, need to consider planning for a future treatment plant expansion (Project) that was originally contemplated in the JEPA.
City Council approval would authorize staff to draft, based on the proposed deal points, a supplemental Memorandum of Understanding (MOU) to the JEPA that will be brought back to the council for approval at a later date.
DISCUSSION
Fairfield Municipal Utilities (FMU) provides water to the cities of Fairfield and Vacaville on a continuous basis and employs staff who are responsible for the operation of Fairfield’s water system, a portion of which includes the NBRWTP. The NBRWTP was conceived and constructed out of a need to realize access to the North Bay Aqueduct (NBA), both of which were completed
in 1988. Back then, both cities needed a new treatment plant capable of accessing and treating the new delta water supply that the NBA would bring to Solano and Napa counties.
The JEPA establishes the parties’ powers to acquire, construct, operate, and maintain facilities for supplying water to the cities’ respective service areas. The JEPA also defines governance, ownership and oversight powers, which are carried out through a Joint Powers Policy Committee (JPPC) consisting of city staff from both Cities (Vacaville Utilities Director and Fairfield Assistant Public Works Director). The JEPA addresses future expansion of the NBRWTP but was written in general language since a future expansion target was unknown.
On December 17, 2024, the council approved Resolution No. 2024-293 authorizing the city manager to execute a professional services agreement with West Yost Associates to provide professional services for the Project, including development of a plant expansion program that would serve as the business case for expanding the NBRWTP. In advance of the Project, the Cities of Fairfield and Vacaville must consider and address a range of legal, technical, and financial matters. The Cities are currently collaborating on the development of the business case, which contemplates the adoption of a supplemental Memorandum of Understanding (MOU) to the JEPA to facilitate implementation of the Project.
As part of the legal aspects for delivering the Project, the proposed deal points will serve as a terms sheet outlining the foundational principles for the Project. The deal points will serve as guiding principles for collaboratively establishing a future supplemental MOU. The supplemental MOU will be built upon and remain consistent with the existing JEPA and will establish the framework for Project delivery including but not limited to, the design, construction, operation, maintenance, cost-share allocations, and other relevant considerations. Once drafted, the supplemental MOU will be brought back for council approval at a later date.
FINANCIAL IMPACT
Approval of the deal points will not have any direct financial implications.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The council may choose not to approve the resolution if additional information is required from staff.
COORDINATED WITH
City of Vacaville and City Attorney’s Office
STAFF CONTACT
David Vong, Senior Civil Engineer
(707) 428-7784
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: Proposed JEPA MOU Deal Points
Attachment 4: Existing JEPA Agreement
CITY OF FAIRFIELD
RESOLUTION NO. 2026-195
APPROVING DEAL POINTS IN ADVANCE OF A SUPPLEMENTAL MEMORANDUM OF
UNDERSTANDING FOR THE NORTH BAY REGIONAL WATER TREATMENT PLANT JOINT
EXERCISE OF POWERS AGREEMENT
WHEREAS, the North Bay Regional Water Treatment Plant (NBRWTP) is jointly owned by the Cities of Vacaville and Fairfield but is operated by City of Fairfield staff; and WHEREAS, governance, ownership and operation of the NBRWTP is outlined in a Joint Exercise Powers Agreement (JEPA), which was executed in 1987 and carried out through a Joint Powers Policy Committee (JPPC) consisting of city staff from both Cities (Vacaville Utilities Director and Fairfield Assistant Public Works Director); and
WHEREAS, both cities are experiencing growth in accordance with their adopted general plans and accordingly, need to consider planning for a future treatment plant expansion (Project) that was originally contemplated in the JEPA; and
WHEREAS, the JEPA addresses future expansion of the NBRWTP but was written in general language since a future expansion target was unknown; and WHEREAS, on December 17, 2024, the City Council approved Resolution 2024-293 authorizing the city manager to execute a professional services agreement with West Yost Associates for the provision of professional services for the Project, updating the 5-year Capital Improvement Plan to include the Project, and authorizing an update to the Fiscal Year 2024–2025 budget directing staff to develop a plant expansion program that would serve as a business case for expanding the NBRWTP; and
WHEREAS, currently, the Cities of Fairfield and Vacaville are collaboratively working on the business case which contemplates adoption of a structured set of deal points that will serve as a terms sheet outlining the foundational principles for the expansion; and WHEREAS, the deal points will serve as guiding principles for collaboratively establishing a future supplemental memorandum of understanding (MOU) that will be built upon and be consistent with the JEPA; and
WHEREAS, the supplemental MOU will be brought back to council for adoption at a future date.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The council does hereby certify its commitment to advancing the Project through adoption of this structured set of deal points.
RES. NO. 2026-195
Section 2. The council is authorized to do all things necessary to implement this resolution.
PASSED AND ADOPTED this 20th day of October 2026, by the following vote:
AYES: MEMBERS: VACCARO/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________ _________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
1 NBR Water Treatment Expansion
Vacaville/Fairfield Joint Exercise of Powers Agreement
Supplemental Memorandum of Understanding Deal Points
I. Cost Allocation
The following categories represent the anticipated capital, operational, and administrative expenditures associated with the rehabilitation, restoration, and expansion components of the North Bay Regional Water Treatment Plant project (the “Project”). Consistent with the 1987 Joint Exercise of Powers Agreement (“JEPA”), any identified “sole benefit” cost that may arise in connection with any of the below categories is to be allocated 100% to the solely benefitting party, and any identified “partial sole benefit” costs are to be specifically allocated by separate mutual agreement of the Joint Powers Policy Committee (“JPPC”). At present, the engineer’s estimate associated with the Project is $XX,
1 although the parties recognize that this amount may change as the Project progresses, and any such updates will be memorialized and shared with each party’s governing body as applicable.
1. Capital Expenditures
a. Replacement, rehabilitation, and other capital expenditures2 associated with the initial facilities3 will be divided as follows:
i. If in excess of $5,000.00:
1. Per the JEPA as defined in Table 1, Cost Allocation, same as peak day capacity allocation at time cost authorized.
ii. If $5,000.00 or below:
1. Per the JEPA as defined in Table 1, Cost Allocation, amounts borne by each party will be based on the parties’ proportion of actual water use in the preceding month.
1 Note: This dollar amount has not been finalized as of the date of these deal points, but will be final before the parties execute the ultimate Supplemental MOU. Each City’s City Council will be asked to approve the Supplemental MOU and will be made aware of the engineer’s estimate for the Project as part of that process. 2 Defined in the JEPA as expenditures other than for operation and maintenance costs, to include but not be limited to: construction projects, equipment, facility or equipment replacement or rehabilitation, and contributions to major maintenance reserves, including associated predesign, design, and start-up costs if separable from general operation and maintenance costs. 3 This term is defined in the JEPA, but may be generally understood to encompass the existing NBR Water Treatment Plant as it presently exists, in its non-expanded state.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
2 b. Capital expenditures associated with restoring the initial facilities’ ability to attain a treatment capacity of 40 million gallons per day (“mgd”),4 which the initial facilities are presently rated to attain but are not in fact attaining, will be divided as follows:
i. 2/3 of cost to be borne by Fairfield
ii. 1/3 of cost to be borne by Vacaville
c. Capital expenditures for expanding the joint facilities to increase capacity, as contemplated by Section VIII of the JEPA, will be divided based on each party’s proportional increase in capacity, using an assumption of expansion from 40 mgd to 47 mgd.5 i. Fairfield’s capacity will remain at 26.66 mgd, representing a 0% share of the increased capacity, and therefore Fairfield will bear 0% of capital expenditures for the expansion.
ii. Vacaville’s capacity will increase by 7 mgd (from 13.33 to 20.33 mgd6), representing a
65.57% increase, and therefore Vacaville will bear 100% of the capital expenditures for expansion.
d. The cost of shared facilities required to support the initial facilities and the expansion (e.g., intake, electrical upgrades, and site improvements) will be allocated using an engineering cost-of-service (“ECOS”) methodology to ensure that each party pays an amount proportional to the capacity or benefit it receives. The ECOS methodology, including processes for resolving any disputes between the parties on the methodology, is to be more specifically addressed as part of the Supplemental MOU. At present, the parties anticipate a cost share that will be directly proportionate to the capacity or benefit received by that party (i.e., each party will pay its “fair share” as determined by mutual arrangement of the parties with reference to an objective methodology standard in the Supplemental MOU). e. Cost allocation associated with post-expansion operations (e.g., replacement of facilities and equipment once the Project is complete) will be addressed through a separate amendment to the JEPA or additional Supplemental MOU, as the parties may deem appropriate, and subject to separate review and approval by each party’s governing body.
4 Defined in the JEPA and West Yost business case. (Development of the Supplemental MOU will summarize the difference between nominal and actual capacity.)
5 If this assumption changes during the Project, the cost-share formula will be revisited and any necessary updates to the Supplemental MOU document will be made. At present, the facility attains treatment capacity of 30 mgd; the parties plan to formally address restoration of the ability to attain its rated capacity of 40 mgd as part of the Supplemental MOU.
6 30 mgd is the maximum capacity allocation Vacaville may reach under the JEPA; any future agreements to expand Vacaville’s capacity further will require the parties to amend the JEPA.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
3 2. Fixed and Variable Operation and Maintenance Costs a. Prior to any design work or construction commencing on the expansion, fixed and variable operation and maintenance costs will continue to be borne in the manner set out in Table 1 of the JEPA (i.e., no change from present).
b. For the duration of the design work and construction of the expansion, fixed and variable operation and maintenance costs will continue to be borne in the manner set out in Table 1 of the JEPA. For fixed operation and maintenance costs, that means each party will pay in proportion to its peak day capacity allocation at the time the cost is authorized. For variable operation and maintenance costs (except for treated water pumping power costs and construction management costs), that means each party will pay based on its projected water use, adjusted retroactively each month according to actual water use. For treated water pumping power costs, each party will pay based on its actual metered power use. For construction management costs during design and construction phases for the expansion, Fairfield will bear 50% of the overall cost, and Vacaville will bear 50% of the overall cost, reflecting each party’s share of increased capacity in the expanded facility. i. Processes for resolving any disputes between the parties relating to construction management costs during design and construction phases are to be more specifically addressed as part of the Supplemental MOU.
c. After expansion is complete:
i. Fixed operation and maintenance costs will be allocated according to each party’s post-expansion facility ownership percentage.
ii. Variable operation and maintenance costs and ongoing repair and replacement costs associated with the expanded facilities will be allocated according to each party’s projected water use, adjusted retroactively each month according to actual water use.
3. Administrative and General Costs
a. Prior to and during design and construction of the expansion, direct and indirect administrative costs (including, but not limited to, permitting expenses, salaries and wages, insurance, and related incidental expenses) are considered a “fixed operation and maintenance cost” per Sections I and IV.C. of the JEPA, and the Administering Party7 will
7 The JEPA presently designates the City of Fairfield as the Administering Party.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
4 have those costs reimbursed out of the JPA Fund8 except for fees, taxes, or in lieu fees or taxes incurred for the sole benefit of the Administering Party. b. After expansion is complete, direct and indirect administrative and general costs will still be considered fixed operation and maintenance costs and will be allocated (in alignment with Section I.2.c.i. of this deal points document, above) according to each party’s post-expansion facility ownership percentage. i. Through the Supplemental MOU, the parties will establish a staffing review process to evaluate current staffing capabilities and demands associated with the Project, any proposed new positions to be created, or other material changes to baseline staffing.
This process will include, at a minimum, requiring written justification before making any staffing changes that sets out operational need addressed by the proposed change, cost impacts, and what alternatives were considered. The process will also include a defined review period for both parties to consider the requested change(s) and seek additional information as needed prior to a formal approval or rejection of the request by the JPPC.
II. Design and Delivery of Expansion
1. Delivery. The parties agree to use a progressive design-build delivery method for the Project, or such other mutually agreeable competitive contracting mechanism for Project delivery as may be authorized under state public contract law and the parties’ procurement policies.
2. Design Specifications.
a. The basis for the design of the Project will be specified through “Design Specifications and Performance Requirements,” documented in a “Benchmark Design Report” and subject to approval by the JPPC.
i. Design specifications may be refined and adjusted to improve quality or control costs as mutual agreed by the parties until the Project’s design is completed. Such adjustments are subject to approval by the JPPC.
b. Provisions for Future Expansion (beyond the current project scope) i. Space for future expansion will be identified and reserved within the existing site boundary, in accordance with the Design Specifications and Performance Requirements to be adopted.
8 Defined in the JEPA as the fund created to cover the financial needs of the joint facilities; deposits to the JPA fund by each party are covered in Section XI of the JEPA.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
5 ii. Design for current Project will identify any features associated with future expansion that should be constructed now to minimize operational disruption during the future expansion, in accordance with the Design Specifications and Performance Report to be adopted.
3. Design Review and Approval.
a. The parties agree to follow the design review process for the expansion as is set forth in Section VII.C. of the JEPA, with potential modifications to accommodate the expansion project, to be detailed in the Supplemental MOU.
9 Any dispute resolution processes
regarding design specifications and review that may arise are to be more specifically addressed as part of the Supplemental MOU.
b. Operation, maintenance, and engineering staff from both party agencies will be afforded the opportunity to provide input during development of the detailed design for the expansion, subject to review and approval under the guidelines set forth in the JEPA and Supplemental MOU.
c. The JPPC will have final design approval authority over Projects within the property boundary of the water treatment plant, as depicted in Exhibit A. d. Outside the property boundary of the water treatment plant, as depicted in Exhibit A, the City of Vacaville’s Utilities Department or designee thereof will have final design approval over the “Vacaville Transmission Main” component of the Project. e. Outside the property boundary of the water treatment plant, as depicted in Exhibit A, the City of Fairfield’s Municipal Utility or designee thereof will have final design approval over the “Fairfield Transmission Main” component of the Project.
III. Contract Negotiation and Construction Management.
1. Terms and Price Negotiation.
a. The JPPC has authority to negotiate and approve all terms of the contract, including price. b. The JPPC will agree on a guaranteed maximum price and will recommend that value for approval by the respective City Councils or other appropriate bodies as needed. This is not intended to affect either party’s ability to secure debt financing based upon the approved
9 For example, the parties may decide to update the JEPA’s current $40,000 cap for reimbursement (and/or clarify its interpretation as applied to the Project) from the JPA Fund for each party’s independent design review (JEPA § VII.C) if such action would not require a JEPA amendment and/or refer to the Owners Rep contract independent design review. To clarify, the parties are applying the JEPA design review process designated for initial facility planning, design, and construction to the current project phase, i.e., expansion.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
6 guaranteed maximum price if needed, or to otherwise interfere with otherwise applicable approval processes under local policies or public contracting laws. c. The Supplemental MOU will further detail the abilities of each party to independently seek financing in connection with the Project, identify how the parties anticipate obtaining such financing (e.g., bonds, other debt mechanisms), and clarify the allocation of any debt service associated with the Project.
2. Construction Management. The parties agree to follow the construction management process for the expansion as is set forth in Section VII.E. of the JEPA, subject to clarification of that process as it applies to the Project in the Supplemental MOU, so long as such clarification is consistent with the intent and plain language of the JEPA. 10 Any dispute resolution processes
regarding construction management that may arise are to be more specifically addressed as part of the Supplemental MOU.
3. Change Approval Authority.
a. Modifications to, or deviations from, the adopted Design Specifications and Performance Requirements will require approval by the JPPC, except that as set forth in II.3.e. hereof, the City of Vacaville’s Utilities Director or designee will review and approve any such modifications or deviations as they pertain to the Vacaville Transmission Main component of the Project that is outside of the property boundary of the water treatment plant, as depicted in Exhibit A.
b. All construction change orders are subject to final approval of the JPPC and shall follow the Administering Party’s applicable local policies and procedures, and any applicable state or federal laws.
c. The progressive design-build contract for the Project will include allowances, as mutually agreed upon by the parties and as may be authorized under state public contract law and the parties’ procurement policies, to appropriately allocate risk. The Project budget will include an owner-controlled contingency to facilitate any unanticipated cost-effective opportunities to improve the Project as may arise during design and construction.
IV. Real Property and Facility Ownership
10 To clarify, the parties are applying the JEPA construction management process designated for initial facility planning, design, and construction to the current project phase, i.e., expansion.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
7 1. Joint property11 will continue to be governed by the JEPA. This means the parties will each own every item of joint property in proportion to the amount each party paid through the JPA Fund12 to acquire that item unless the parties agree otherwise in writing.
2. In accordance with the JEPA, should any additional land acquisition be required in connection with the Project (such as an expansion of the current Vacaville pipeline easement), each party will deposit its share of the JPPC’s estimated cost for that acquisition, including a 10% contingency.
V. Reflecting Current Operational and Administrative Practices in Supplemental MOU
1. Through the Supplemental MOU, the parties will memorialize their understanding that the existing JEPA allows Fairfield, in its capacity as the Administering Party of the JEPA, to contract on behalf of both agencies for purposes of delivering the Project and may otherwise act as a recipient for any grants or loans for the Project.
2. Through the Supplemental MOU, the parties will clearly document their understanding as to the expanded facility’s operational capabilities and each party’s share of the overall facility ownership to the extent it differs from what is documented in the JEPA.
3. Through the Supplemental MOU, the parties will determine whether the subject of emergency exceedances of their respective allocations may be negotiated and resolved in connection with the Supplemental MOU, or if an amendment to the JEPA is required.
4. The Supplemental MOU will identify a specific process for dispute resolution should the JPPC, as an entity made up of two persons holding equal voting power, reach a deadlock on any issue referred to it.
VI. General Terms of Supplemental MOU
1. Term and Termination. The Supplemental MOU will contain provisions regarding the anticipated term, how it may be terminated, what happens if a party seeks to withdraw from the Project, and the consequences of default or nonperformance.
2. Environmental Review. The Supplemental MOU will clarify each party’s responsibilities pertaining to any necessary environmental review associated with the Project.
3. Permitting and Regulatory Compliance. The Supplemental MOU will address anticipated permitting needs and how the parties will collaborate to obtain necessary permits and
11 Defined in the JEPA as any property acquired as a result of the parties jointly exercising their powers under the terms of the JEPA.
12 Defined in the JEPA as the fund created to cover the financial needs of the joint facilities (water pipelines, pumps, reservoirs, land associated with the Project, etc.)
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
8 entitlements, how prevailing wage and labor compliance matters will be handled, and related topics.
4. Miscellaneous. The Supplemental MOU will address how the parties may amend the Supplemental MOU, notice provisions, venue for any legal purposes, and related administrative matters.
NOTE: This document is in draft form; it does not constitute an offer, and is not binding on any party.
9 EXHIBIT A
Agenda Item No: K.3
AGENDA REPORT
DATE: October 20, 2026
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2026-196 PW Initial Study/Mitigated Negative Declaration for the North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works Project
Adopting the Initial Study/Mitigated Negative Declaration for the North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works Project Funding Source: N/A
Contact: Michael Hether, (707) 428-7493
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
The North Bay Regional Water Treatment Plant (NBRWTP) is jointly owned by the Cities of Vacaville and Fairfield but is operated by City of Fairfield staff. Governance, ownership and operation of the NBRWTP is outlined in a Joint Exercise Powers Agreement (JEPA), which was executed in 1987. Both cities are experiencing growth in accordance with their adopted general plans and accordingly, need to consider planning for a future treatment plant expansion (Project) that was originally contemplated in the JEPA.
City Council approval would result in adoption of the Initial Study/Mitigated Negative Declaration (IS/MND) so that the Cities of Vacaville and Fairfield may continue planning for the Project.
DISCUSSION
Fairfield Municipal Utilities (FMU) provides water to the cities of Fairfield and Vacaville on a continuous basis and employs staff who are responsible for the operation of Fairfield’s water system, a portion of which includes the NBRWTP. The NBRWTP was conceived and constructed out of a need to realize access to the North Bay Aqueduct (NBA), both of which were completed
in 1988. Back then, both cities needed a new treatment plant capable of accessing and treating the new delta water supply that the NBA would bring to Solano and Napa counties.
The JEPA establishes the parties’ powers to acquire, construct, operate, and maintain facilities for supplying water to the cities’ respective service areas. The JEPA also defines governance, ownership and oversight powers, which are carried out through a Joint Powers Policy Committee (JPPC) consisting of city staff from both Cities (Vacaville Utilities Director and Fairfield Assistant Public Works Director). The JEPA addresses future expansion of the NBRWTP but was written in general language since a future expansion target was unknown.
On December 17, 2024, the council approved Resolution No. 2024-293 authorizing the city manager to execute a professional services agreement with West Yost Associates to provide professional services for the Project, including development of a plant expansion program that would serve as the business case for expanding the NBRWTP. In advance of the Project, the Cities of Fairfield and Vacaville must consider and address a range of legal, technical, financial and environmental matters.
As part of environmental compliance for carrying out the Project, the City of Fairfield, as the lead agency, prepared a draft Initial Study and Mitigated Negative Declaration (IS/MND) in accordance with the California Environmental Quality Act (CEQA). An application for an Environmental Review (ER2026-0025) was submitted with the Community Development Department for a Mitigated Negative Declaration (SCH #2026080694). The IS/MND identified potential environmental impacts that are expected to be reduced to be less-than-significant through implementation of mitigation measures. These measures address biological, cultural, wildfire, geological, hazardous materials, noise, and tribal resources Based on the initial study, the City has determined that, with the proposed mitigation measures, the Project will not result in a significant environmental impact.
The City of Fairfield filed a Notice of Intent (NOI) with Solano County, which was made available to the public for a 30-day public review and comment period. Comments were received from the following entities:
State Water Resources Control Board
California Department of Transportation
Department of Water Resources
California Department of Fish and Wildlife
Additionally, the city sent AB 52 Tribal Consultation Letters to local Native American tribes and published the IS/MND on the City of Fairfield's website.
The intent of the IS/MND is to provide information concerning potential environmental impacts of the proposed Project and specifies the required mitigation measures. Staff will return to council later to request approval of the proposed Project.
City staff recommend that the council approve the resolution adopting the IS/MND.
FINANCIAL IMPACT
This is an administrative function with no direct fiscal impact associated with the adoption of the IS/MND for the Project.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
The NOI to adopt the IS/MND was filed with the Solano County Clerk on August 21, 2026, published in the local newspaper on August 23, 2026, for a 30-day public review and comment period. Planning staff also held a public hearing for the IS/MND on October 13, 2026.
ALTERNATIVE ACTION
The council has the option to decline the adoption of the IS/MND; however, doing so may affect eligibility for certain state and federal loans and grants.
COORDINATED WITH
Community Development Department and City of Vacaville
STAFF CONTACT
David Vong, Senior Civil Engineer
(707) 428-7784
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: IS/MND Notice of Intent
Attachment 4: Draft Initial Study and Mitigated Negative Declaration Attachment 5: Draft Response to Comments
CITY OF FAIRFIELD
RESOLUTION NO. 2026-196
ADOPTING THE INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FOR THE NORTH BAY
REGIONAL WATER TREATMENT PLANT FAIRFIELD-VACAVILLE WATER WORKS PROJECT WHEREAS, an application for an Environmental Review (ER2026-0025) was filed with the Community Development Department for a Mitigated Negative Declaration (SCH #2026080694) for the North Bay Regional Water Treatment Plant (NBRWTP) Fairfield-Vacaville Water Works Project (Project) in accordance with the California Environmental Quality Act (CEQA), including Public Resources Code Section 21092, and State CEQA Guidelines Section 15072 and 15073; and WHEREAS, the Project proposes expanding the capacity and operational efficiency of the existing NBRWTP, a joint effort between the City of Fairfield (City) and the City of Vacaville, and would include construction of an associated new pipeline; and WHEREAS, the Project improvements are designed to enhance water treatment reliability, accommodate projected population growth and service demand, and modernize aging infrastructure to ensure continued regulatory compliance; and WHEREAS, the Initial Study and Mitigated Negative Declaration (IS/MND) analyzed the environmental impacts of this project in accordance with CEQA and mitigation measures have been identified to reduce all potentially significant impacts to less than significant levels, and these are addressed in the Mitigated Negative Declaration and the Mitigation Monitoring and Reporting Program; and
WHEREAS, on August 23, 2026, the City published a Notice of Intent (NOI) to Adopt Mitigated Negative Declaration in the local newsletter for public review of the IS/MND for 30 days and additionally, filed with the Solano County Clerk on August 21, 2026. Additionally, the City sent AB 52 Tribal Consultation Letters to local Native American tribes, and posted the IS/MND on the City’s website; and
WHEREAS, the City held a public hearing on October 13, 2026; and WHEREAS, the City considered all public testimony and information presented during the public hearing; and
WHEREAS, the City serving as the Lead Agency finds that there is no substantial evidence that the Project will have a significant impact on the environment; and WHEREAS, the City considered comments received during public review and revisions made in response to those comments, as documented in the Final IS/MND and accompanying response-to-comments materials.
RES. NO. 2026-196
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The City Council does hereby approve and adopt the Final Initial Study/Mitigated Negative Declaration, Mitigation Monitoring and Reporting Program as the environmental document for the Project and concludes that no further environmental review is required.
Section 2. The assistant public works director/utilities or designee is authorized to execute and file a Notice of Determination and related CEQA filing documents with the Solano County Clerk and the State Clearinghouse/Office of Planning and Research, as applicable for the Project.
PASSED AND ADOPTED this 20th day of October 2026, by the following vote:
AYES: MEMBERS: VACCARO/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________ _________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
F6w\L,
FAIBFIELD
F]F 'il;J/
--
CITY OF FAIRFIELD
Fowtded 1856 - Irtcotporated Decenther 12, 1903
PUBLIC WORKS DEPARTMENT
Engineering Division
FILED
NOTICE OF INTENT TO ADOPT MITIGATED NEGATIVE DECTARATION AUG 2 t 2026
lan M. Goldberg, Clerk ol the
Board ol Suprvlsorr of the
County of Solano,
State of Calilornla Dsp@
NOTICE tS HEREBY GTVEN that the City of Fairfield (City), as Lead Agency, has prepared a Draft lnitial Study/Mitigated Negative Declaration (lS/MND) for the North Bay Regional Water Treatment Plant (NBRWTP) Fairfield-Vacaville Water Works Project (Project) in accordance with the California Environmental Quality Act (CEQA), including Public Resources Code Section 2L092 and State CEQA Guidelines Sections !5072 and 15073. Based on the lnitial Study, the City has determined that, with implementation of the identified mitigation measures, the Project would not have a significant effect on the environment.
PROJECT: North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works Project PROJECT LOCATION: The Project is located in central Solano County, within the cities of Fairfield and Vacaville. The existing NBRWTP is located within the City of Fairfield, approximately 6 miles northeast of downtown Fairfield and 3.8 miles south of downtown Vacaville, near the southeast base of the Vaca Mountains. The Project includes improvements within the existing NBRWTP site and a treated water transmission pipeline extending north from the NBRWTP toward the City of Vacaville distribution system. Two pipeline alignments are under consideration: the Linear Trail Pipeline Alignment, generally following the existing trail and Putah South Canal corridor, and the Peabody Road Pipeline Alignment, generally following the Peabody Road corridor.
PROJECT DESCRIPTION: The Project would expand and modernize the existing NBRWTP, jointly
operated by the Cities of Fairfield and Vacaville, to increase treatment capacity from approximately 52.7 million gallons per day (mgd) to a maximum of 65 mgd. The expansion may be implemented in phases and would include new and upgraded water treatment facilities, pumping and chemical storage systems, electrical and control systems, operations facilities, and energy resiliency improvements, including battery energy storage and emergency backup generation. The Project also includes construction of a new treated-water transmission pipeline connecting the NBRWTP to the City of Vacaville's existing water distribution system. Two pipeline alignments are under consideration: the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. The Project is intended to improve treatment capacity, operational reliability and resiliency, and water delivery to meet existing and planned water demands within the City's adopted service areas.
ENVIRONMENTAL DETERMINATION: The lnitial Study identifies potentially significant environmental effects that would be reduced to less-than-significant levels through implementation of mitigation Docurnent Posted From
Slztizb to
lt
1000 Webster Street . Fairfield
. California . 94533_4936. (707\ 428_7400. fairfield.ca.gov
North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works project IS/MND Notice of lntent
August L8,2026
' 'rrheasures. Mitigbtion measures are identified for Biological, Cultural, Geology and Soils, Hazards and Hazardous Materials, Noise and Vibration, Tribal Cultural Resources, and Wildfire.
With implementation of the mitigation measures identified in the Draft lS/MND and Mitigation Monitoring and Reporting Program, the City has determined that the project would not have a significant effect on the environment. Accordingly, the city proposes to adopt a Mitigated Negative Declaration for the project.
ra;;q4G .rPl["FlHSR$tEw PERIOD: The Draft ls/MND will be available for a 30-day public review and comment period from August 24,2026 through September 23,2026. Written comments must be received by the City no laterthan 5:00 p.m. on September23,2O26.
The Draft lS/MND and supporting technical appendices are available for review online at:
City of Fairfield CEqA ge.ur"n,r.
httPs: / /www.fairfield.ca.Aov vernment'ciW-departments/communitv-development/planninF-division/c-e-q-a A hard copy of the Draft lS/MND is also available for review during normal business hours at:
City of Fairfield Public Works Department
1000 Webster Street
Fairfi eld, California 94533
SUBMITTING COMMENTS: Written comments regarding the Draft tS/MND should be submitted to:
David Vong P.E., Senior Civil Engineer
City of Fairfield Public Works Department
1000 Webster Street
Fairfield, California 94533
Email: [email protected]
Please include "North Bay Regional Water Treatment Plant Fairfield-Vacaville Water Works project lS/MND" in the subject line of emailed comments.
PUBLIC MEETING/HEARING: The City of Fairfield is currently scheduled to consider the project and the proposed Mitigated Negative Declaration on October 13,2026. Meeting information is subject to change. Please consult the City's meeting agenda prior to the meeting for current information.
DATE OF NOTICE: August 24,2026
October 2026
FINAL
INITIAL STUDY /
MITIGATED NEGATIVE DECLARATION
State Clearinghouse No. 2026080694
NORTH BAY REGIONAL WATER TREATMENT PLANT, FAIRFIELD-VACAVILLE
WATER WORKS PROJECT
FAIRFIELD, CALIFORNIA
This page intentionally left blank
October 2026
FINAL
INITIAL STUDY/
MITIGATED NEGATIVE DECLARATION
NORTH BAY REGIONAL WATER TREATMENT PLANT, FAIRFIELD-VACAVILLE
WATER WORKS PROJECT
FAIRFIELD, CALIFORNIA
Submitted to:
City of Fairfield
1000 Webster Street
Fairfield, California 94533
Prepared by:
LSA Associates, Inc.
1504 Eureka Road, Suite 310
Roseville, California 95661
Project No. 20252567.02
This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) i
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................................... i FIGURES AND TABLES ............................................................................................................................ iii LIST OF ABBREVIATIONS AND ACRONYMS............................................................................................ iv
1.0 PROJECT INFORMATION................................................................................... 1-1
2.0 PROJECT DESCRIPTION ..................................................................................... 2-1
2.1 Project Site ........................................................................................................................ 2-1
2.2 Proposed Project............................................................................................................... 2-7
2.3 Construction Equipment ................................................................................................. 2-26
2.4 Construction Staging and Parking Areas.........................................................................2-27
2.5 Operational Staffing and Vehicle Trips............................................................................2-27
2.6 Construction Schedule .................................................................................................... 2-28
2.7 Project Approvals............................................................................................................ 2-28
3.0 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED........................................ 3-1
3.1 Determination................................................................................................................... 3-1
4.0 CEQA ENVIRONMENTAL CHECKLIST.................................................................. 4-1
4.1 Aesthetics.......................................................................................................................... 4-1
4.2 Agriculture and Forestry Resources.................................................................................. 4-9
4.3 Air Quality ....................................................................................................................... 4-16
4.4 Biological Resources........................................................................................................ 4-30
4.5 Cultural Resources .......................................................................................................... 4-83
4.6 Energy.............................................................................................................................. 4-93
4.7 Geology and Soils............................................................................................................ 4-99
4.8 Greenhouse Gas Emissions...........................................................................................4-110
4.9 Hazards and Hazardous Materials ................................................................................4-120
4.10 Hydrology and Water Quality .......................................................................................4-137
4.11 Land Use and Planning ..................................................................................................4-157
4.12 Mineral Resources.........................................................................................................4-161
4.13 Noise.............................................................................................................................. 4-164
4.14 Population and Housing ................................................................................................4-181
4.15 Public Services............................................................................................................... 4-186
4.16 Recreation ..................................................................................................................... 4-192
4.17 Transportation .............................................................................................................. 4-194
4.18 Tribal Cultural Resources ..............................................................................................4-201
4.19 Utilities and Service Systems.........................................................................................4-206
4.20 Wildfire.......................................................................................................................... 4-219
4.21 Mandatory Findings of Significance ..............................................................................4-228
5.0 MITIGATION MONITORING AND REPORTING PROGRAM (MMRP) .................... 5-1
6.0 LIST OF PREPARERS .......................................................................................... 6-1
7.0 REFERENCES..................................................................................................... 7-1
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) ii
APPENDICES
A: CALIFORNIA EMISSIONS ESTIMATOR MODEL (CALEEMOD) RESULTS B: AQUATIC RESOURCES DELINEATION AND BIOLOGICAL RESOURCES REPORT C: CULTURAL RESOURCE INVENTORY REPORT
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) iii
FIGURES AND TABLES
FIGURES
Figure 2-1: Regional Location .............................................................................................................. 2-3 Figure 2-2: Project Site ........................................................................................................................ 2-5 Figure 2-3: Land Use Designations...................................................................................................... 2-9 Figure 2-4: Zoning.............................................................................................................................. 2-11 Figure 2-5: Conceptual Design........................................................................................................... 2-15 Figure 4.4-1: Land Cover Impacts...................................................................................................... 4-59 Figure 4.13-1: Existing Noise Monitoring Locations........................................................................4-169 TABLES
Table 1.A: Potential Permits and Approvals........................................................................................ 1-4 Table 2.A: Potential Permits and Approvals......................................................................................2-29 Table 4.3.A: Project Construction Emissions.....................................................................................4-25 Table 4.3.B: Project Operational Emissions.......................................................................................4-26 Table 4.4.A: Special-Status Species Evaluated for the Project..........................................................4-44 Table 4.4.B: Preliminary Potential Impacts to Land Cover Types1 ....................................................4-61 Table 4.8.A: Operational Greenhouse Gas Emissions.....................................................................4-117 Table 4.13.A: Definitions of Acoustical Terms.................................................................................4-166 Table 4.13.B: Common Sound Levels and Their Noise Sources ......................................................4-167 Table 4.13.C: Existing Noise Level Measurements..........................................................................4-171 Table 4.13.D: Detailed Assessment Daytime Construction Noise Criteria......................................4-172 Table 4.13.E: Interpretation of Vibration Criteria for Detailed Analysis.........................................4-173 Table 4.13.F: Construction Vibration Damage Criteria ...................................................................4-173 Table 4.13.G: Typical Construction Equipment Noise Levels..........................................................4-175 Table 4.13.H: Noise Levels by Construction Phase..........................................................................4-176 Table 4.13.I: Construction Noise Levels ..........................................................................................4-177 Table 4.13.J: Vibration Source Amplitudes for Construction Equipment........................................4-179
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) iv This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) v
LIST OF ABBREVIATIONS AND ACRONYMS
µg/m3 microgram(s) per cubic meter
AB Assembly Bill
Air District Bay Area Air District
ALUCP Airport Land Use Compatibility Plan
A-P Act Alquist-Priolo Earthquake Fault Zoning Act
Basin Plan Water Quality Control Plan
BESS battery energy storage system
BMPs best management practices
CAAQS California Ambient Air Quality Standards
CAFE Corporate Average Fuel Economy
CalEPA California Environmental Protection Agency
CAL FIRE California Department of Forestry and Fire Protection Cal/EPA California Environmental Protection Agency
Cal/OSHA California Division of Occupational Safety and Health CalEEMod California Emissions Estimator Model
CALGreen California Green Building Standards Code
CalRecycle California Department of Resources Recycling and Recovery Caltrans California Department of Transportation
Caltrans Manual Caltrans Transportation and Construction Vibration Guidance Manual CAP Climate Action Plan
CARB California Air Resources Board
CBC California Building Code
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
vi \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) CBSC California Building Standards Code
CCR California Code of Regulations
CDFW California Department of Fish and Wildlife
CEC California Energy Commission
CEQA California Environmental Quality Act
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CESA California Endangered Species Act
CFC California Fire Code
CFR Code of Federal Regulations
CGP Construction General Permit
CGS California Geological Survey
CH4 methane
CHHSL California Human Health Screening Level
CIWMB California Integrated Waste Management Board
City City of Fairfield
Clean Air Plan Air District 2017 Clean Air Plan
CNDDB California Natural Diversity Database
CNEL Community Noise Equivalent Level
CNPS California Native Plant Society
COA Condition of Approval
CO2e carbon dioxide equivalent
Cortese List Hazardous Waste and Substances Sites List
County County of Solano
CRPR California Rare Plant Rank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) vii CTR California Toxics Rule
CUPA Certified Unified Program Agency
CWA Clean Water Act
CY cubic yards
dB decibel
dBA A-weighted decibel
DDT dichlorodiphenyltrichloroethane
DEIR Draft Environmental Impact Report
DHS California Department of Health Services
DOC California Department of Conservation
DPM diesel particulate matter
DPS Distinct Population Segment
DTSC California Department of Toxic Substances Control
ECAS City of Vacaville Energy and Conservation Action Strategy EIR Environmental Impact Report
EO Executive Order
EPA United States Environmental Protection Agency
ESA Environmentally Sensitive Area
EST Estuarine Habitat
EV electric vehicle
FAA Federal Aviation Administration
FAR Federal Aviation Regulation
FERC Federal Energy Regulatory Commission
FEMA Federal Emergency Management Agency
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
viii \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) FESA federal Endangered Species Act
FFD Fairfield Fire Department
FHWA Federal Highway Administration
FHSZs Fire Hazard Severity Zones
FGC California Fish and Game Code
FIRMs Flood Insurance Rate Maps
FMMP Farmland Mapping and Monitoring Program
FRAs Federal Responsibility Areas
FSZ Farmland Security Zone
ft foot/feet
FSSD Fairfield-Suisun Sewer District
FTA Federal Transit Administration
GHG greenhouse gas
GSAs groundwater sustainability agencies
GWh gigawatt-hours
HAs Hydrologic Areas
HCP Habitat Conservation Plan
HDD Horizontal Directional Drilling
HDPE high-density polyethylene
HMBP Hazardous Materials Business Plan
HSAs Hydrologic Subareas
HUs Hydrologic Units
I-80 Interstate 80
inch/sec inches per second
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) ix IS/MND Initial Study/Mitigated Negative Declaration
IWMP Integrated Water Management Plan
kWh kilowatt-hours
Ldn day-night average noise level
Leq equivalent continuous sound level
LHMP Local Hazard Mitigation Plan
LID Low Impact Development
Lmax maximum instantaneous noise level
LOS level of service
LRAs Local Responsibility Areas
LSA LSA Associates, Inc.
LUCP Travis Air Force Base Land Use Compatibility Plan
MBTA Migratory Bird Treaty Act
mgd million gallons per day
mL milliliters
MMRP Mitigation Monitoring and Reporting Program
MND Mitigated Negative Declaration
MRP Municipal Regional Stormwater Permit
MRMPs Mineral Resource Management Policies
MRZs Mineral Resource Zones
MS4 Municipal Separate Storm Sewer System
MUN municipal and domestic supply
MWs megawatts
NAHC Native American Heritage Commission
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
x \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) National Register National Register of Historic Places
NAV Navigation
NBRWTP North Bay Regional Water Treatment Plant
NCCP Natural Community Conservation Plan
NEHRP National Earthquake Hazards Reduction Program
NEHRPA National Earthquake Hazards Reduction Program Act NFIP National Flood Insurance Program
NIMS National Incident Management System
NPDES National Pollutant Discharge Elimination System
OEHHA Office of Environmental Health Hazard Assessment
OHWM ordinary high water mark
OPR California Governor’s Office of Planning and Research OSHA Occupational Safety and Health Administration
OS Open Space
PCB polychlorinated biphenyl
PDA Priority Development Area
PF Public Facilities
PG&E Pacific Gas and Electric Company
Porter-Cologne Act Porter-Cologne Water Quality Control Act of 1970 PPV peak particle velocity
PRC Public Resources Code
Project North Bay Regional Water Treatment Plant Expansion, Fairfield-Vacaville Water Works Project
PVC polyvinyl chloride
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) xi RARE Preservation of Rare and Endangered Species
RCRA Resource Conservation and Recovery Act
REC-1 Water Contact Recreation
REC-2 Noncontact Water Recreation
RL Residential
RM Residential, Medium Density
RWQCB Regional Water Quality Control Board
SB Senate Bill
SCADA Supervisory Control and Data Acquisition
SCH State Clearinghouse
SCP Stormwater Control Plan
SCS Sustainable Communities Strategy
SCWA Solano County Water Agency
SDWA Safe Drinking Water Act
SF6 sulfur hexafluoride
SGMA Sustainable Groundwater Management Act of 2014
SHMP California State Hazard Mitigation Plan
SMARA Surface Mining and Reclamation Act
SMGB California State Mining and Geology Board
SOI Sphere of Influence
SPWN Fish Spawning
SR-12 State Route 12
SRA State Responsibility Area
SSC Species of Special Concern
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
xii \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) SWPPP Stormwater Pollution Prevention Plan
SWRCB State Water Resources Control Board
TACs toxic air contaminants
TCR Tribal Cultural Resource
TISG Transportation Impact Study Guide
TMDL total maximum daily load
TPZ Timberland Production Zone
TSCA Toxic Substances Control Act
TRI Toxics Release Inventory
URB Urban
USACE United States Army Corps of Engineers
USC United States Code
USDOT United States Department of Transportation
USGS United States Geological Survey
UWMP Urban Water Management Plan
UWMP Act Urban Water Management Planning Act
VdB vibration velocity decibels
VHFHSZ Very High Fire Hazard Severity Zone
VMT Vehicle Miles Traveled
WARM Warm Freshwater Habitat
WHA Wildlife Habitat Assessment
Williamson Act California Land Conservation Act
WUI Wildland-Urban Interface
ZNE zero net energy
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 1-1
1.0 PROJECT INFORMATION
1. Project Title:
North Bay Regional Water Treatment Plant, Fairfield-Vacaville Water Works Project (Project)
2. Lead Agency Name and Address:
City of Fairfield
1000 Webster Street
Fairfield, CA 94533
3. Contact Person and Phone Number:
David Vong
City of Fairfield Public Works Department
(707) 428-7784
4. Project Location:
The Project lies within the central portion of Solano County, approximately 6 miles northeast of downtown Fairfield and 3.8 miles south of downtown Vacaville. Although it is farther from downtown Fairfield than downtown Vacaville, it does lie within Fairfield’s city limits. The property is near the southeast base of the Vaca Mountains and is generally bounded by an abandoned railroad right-of-way converted to a trail to the south and east, the same trail and Putah South Canal to the north, and Putah South Canal and Waterworks Lane to the west.
Existing residential development is across Waterworks Lane to the west, and the One Lake Subdivision lies just east of the trail. The Project’s extent covers the following Solano County parcels, 0166060200 and 0166020010 (North Bay Regional Water Treatment Plant [NBRWTP]), and 0166202180, 0166020170, and 01365130030 (Linear Trail Pipeline Alignment) and road rights-of-way easements, 0136130010, 0128070060, 0128070070, and 0128070080 (Peabody Road Pipeline Alignment).
Regional access to the Project site is provided primarily by Interstate 80 (I-80), a major east-west transportation corridor in Northern California that connects Fairfield with Sacramento to the east and the San Francisco Bay Area to the west. From I-80, local access is provided via Peabody Road to Waterworks Lane, which terminates at the Project site. Additional connections to the regional roadway network are available through State Route (SR-) 12, located south of downtown Fairfield, which links I-80 to Rio Vista and the Sacramento–San Joaquin River Delta region.
Residential areas within Travis Air Force Base lie within 1.5 miles to the southeast of the Project site, and operational portions of the base are within approximately 2 miles.
Figure 2.1 shows the regional and local context of the Project site. Figure 2.2 shows an aerial photograph of the Project site and surrounding land uses.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
1 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -2
5. General Plan Designation:
The Project site is designated Public Facilities (PF) in the City’s General Plan1 . This designation
provides for public infrastructure and utility uses that serve citywide and regional needs, including water treatment, conveyance, and related municipal services. The existing and proposed uses at the NBRWTP are consistent with this designation.
6. Zoning:
The NBRWTP is in a zoning district also identified as PF, which is intended to accommodate uses and facilities that serve public interest. The PF zoning district is explicitly consistent with the zoning use designation of the City’s General Plan.
2 7. Summary of Proposed Project:
The Project would expand the capacity and operational efficiency of the existing NBRWTP, a joint effort between the City of Fairfield (City) and the City of Vacaville, and would include construction of an associated new pipeline. The Project would increase the NBRWTP’s total treatment capacity up to 65 million gallons per day (mgd), which exceeds the City’s General Plan projected requirement of 55 mgd by 2050. However, the additional capacity is intended to serve the combined existing and planned service demands of both Fairfield and Vacaville within their respective adopted General Plan service areas and does not establish or extend service into previously undeveloped areas beyond those already planned for urban development. The Cities may elect to implement the expansion in phases, constructing a smaller initial expansion followed by additional treatment capacity, up to a maximum of 65 mgd, as future water demands and funding warrant.
The Project improvements are designed to enhance water treatment reliability, accommodate projected population and service demand, and modernize aging infrastructure to ensure continued regulatory compliance. Although the Project would increase available treatment capacity, it would not directly or indirectly induce substantial population growth or facilitate development beyond that already anticipated in adopted local land use plans. Under the California Environmental Quality Act (CEQA), a project is considered growth inducing if it removes obstacles to growth or encourages development that would not otherwise occur. In this case, the Project would primarily maintain and improve regional water system reliability and operational resiliency for planned growth projections already evaluated through local planning processes, rather than provide greater capacity to accommodate new or unplanned growth.
The Project includes construction of new treatment process facilities and upgrades to existing infrastructure within the NBRWTP site. Major improvements include new pre-ozone contactors, flash mix facilities, additional flocculation and sedimentation basins, new filters, chlorine contact basins, wash water recovery and clarifier facilities, sludge lagoons, upgraded treated water pumping systems, expanded chemical storage facilities, and new ozone generators. Electrical, instrumentation, and Supervisory Control and Data Acquisition system upgrades would also be implemented to integrate new and existing treatment processes and improve overall plant 1 City of Fairfield. 2024. General Plan Land Use Diagram Map 2 City of Fairfield. 2024. General Plan and Zoning Map
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 1-3 operations. In addition, the existing operations building would be expanded and upgraded to support ongoing plant operations and staffing needs.
The Project also includes construction of a new treated-water transmission pipeline connecting the NBRWTP to the City of Vacaville’s existing water distribution system. Two alternative pipeline alignments are being considered: the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. The pipeline improvements would enhance operational flexibility and water delivery reliability between the NBRWTP and Vacaville’s distribution network.
Construction activities would primarily occur within the existing treatment plant property, existing utility corridors, roadway rights-of-way, and other previously disturbed areas, with measures implemented to minimize disruption to ongoing plant operations and surrounding land uses.
Additional Project components include installation of a microgrid energy system consisting of battery energy storage, emergency backup generators, and integration with the existing photovoltaic system to improve energy resiliency during utility outages. The Project may also require limited vegetation removal and subsequent landscape restoration within the Project footprint.
Overall, the Project improvements are intended to provide a reliable, resilient, and flexible regional water treatment system capable of meeting current and future water supply demands while protecting public health and maintaining compliance with applicable drinking water regulations.
8. Surrounding Land Uses and Setting:
The NBRWTP is on the eastern periphery of Fairfield in Solano County and is in a predominantly utilitarian, service-oriented setting. The NBRWTP is on a parcel that is fenced and developed with industrial-scale water-treatment infrastructure, pump stations, and associated support buildings, reflecting its designation as a public utility facility. To the north is open space heading towards Vacaville, to the east is One Lake residential communities, to the west is Peabody Road and additional residential neighborhoods and more open space that gradually transitions toward more intensive urban uses closer to I-80, and to the south is some additional open space before transitioning to commercial and industrial parcels and is within a broader context of mixed industrial-agricultural uses. Overall, the surrounding land uses include vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses.
9. Other Public Agencies Whose Approval is Required (e.g., permits, financial approval, or participation agreements):
Although the City is the CEQA Lead Agency for the Project, other public agencies and private entities may also have approval authority or serve as a responsible and/or trustee agency. Table
1.A provides a list of these agencies and the potential permits and approvals required.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
1 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -4 Table 1.A: Potential Permits and Approvals
Lead Agency Permits/Approvals
City of Fairfield IS/MND Approval and Adoption of MMRP Development Plan Review
Grading Permit
Encroachment Permit
Building Permit
Public Works – Traffic Plan
Tree Removal Permit or Authorization
Other Responsible/Trustee Agencies
City of Vacaville Approval and agreement with City of Fairfield’s IS/MND and MMRP findings
City of Fairfield Fire Department CUPA and Hazardous Materials Handling/Storage Permits United States Army Corps of Engineers CWA Section 404 Nationwide Permits and/or Individual Permit Section 7 and Section 106 Consultation
Regional Water Quality Control Board CWA Section 401 Certification or Waste Discharge Permit California Department of Fish and Wildlife Lake or Streambed Alteration Agreement Incidental Take Permit
United States Fish and Wildlife Service Section 7 Consultation and/or Take Permit Source: Compiled by LSA (2025).
CUPA = Certified Unified Program Agencies
CWA = Clean Water Act
IS/MND = Initial Study/Mitigated Negative Declaration
MMRP = Mitigation Monitoring and Reporting Program
SCWA = Solano County Water Agency
USBR = United States Bureau of Reclamation
10. Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resource Code section 21080.3.1? If so, is there a plan for consultation that includes, for example, the determination of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.?? The City initiated tribal consultation pursuant to Assembly Bill 52 (AB 52) by distributing consultation letters dated March 12, 2026, to tribes that had previously requested notification of projects within the area. Follow-up emails were sent on March 26, 2026. Eleven letters were mailed from the City to the following six tribes.
• Cachil Dehe Band of Wintun Indians of the Colusa Indian Community • Confederated Villages of Lisjan Nation
• Cortina Rancheria - Kletsel Dehe Band of Wintun Indians • Grindstone Rancheria of Wintun-Wailaki
• Guidiville Rancheria of California
• Yocha Dehe Wintun Nation
Two tribes responded to the notification, with the Yocha Dehe Wintun Nation formally requesting consultation with the City.
The City conducted a tribal consultation meeting on May 4, 2026, with the Yocha Dehe Wintun Nation to discuss the Project and potential tribal cultural resource concerns. During the meeting, the tribe identified several culturally sensitive areas that would require tribal monitoring during ground-disturbing construction activities. The parties mutually agreed to conduct a follow-up
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 1-5 consultation meeting once the Vacaville Pipeline Alignment is finalized to further evaluate potential impacts and monitoring requirements associated with the selected alignment.
Additional tribal consultation letters were mailed on April 29, 2026, to notify previously contacted tribes of the consideration of the additional Peabody Road Pipeline Alignment. The supplemental notification was provided to ensure that tribes received a complete and accurate description of the Project, including all currently identified pipeline alignment alternatives and associated areas of potential ground disturbance. The additional outreach was intended to support continued meaningful consultation and provide tribes the opportunity to evaluate and comment on potential impacts associated with the expanded Project considerations.
As a result of the consultation process, the Yocha Dehe Wintun Nation tribe requested execution of a standard Tribal Monitoring Agreement during Project construction, including provisions for tribal monitoring during ground-disturbing activities and burial treatment protocols in the event of inadvertent discoveries. Tribal consultation with the City will continue and be completed prior to adoption of the Mitigated Negative Declaration. Additional information regarding tribal cultural resources is provided in Chapter 4, Sections 4.5 and 4.18.
11. Other Environmental Reviews Incorporated by Reference in this Review:
• City of Fairfield General Plan Draft Environmental Impact Report (SCH 2021080289), July 26, 2024
• City of Fairfield General Plan Final Environmental Impact Report (State Clearinghouse [SCH] 2021080289), December 3, 2024
• City of Vacaville Draft Environmental Impact Report (SCH 2011022043), October 25, 2013 • City of Vacaville Final Environmental Impact Report (SCH 2011022043), August 11, 2015 The locations at which these documents are available are identified throughout the document and in the References Section.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
1 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -6 This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-1
2.0 PROJECT DESCRIPTION
This document outlines the proposed North Bay Regional Water Treatment Plant (NBRWTP), Fairfield-Vacaville Water Works Project (Project) that is the subject of this Initial Study/Mitigated Negative Declaration (IS/MND) prepared in accordance with the California Environmental Quality Act (CEQA). The Project would result in the upgrade and expansion of the existing treatment facility and a new pipeline. The Project serves Fairfield and Vacaville. The City of Fairfield (City) is the Lead Agency responsible for reviewing the Project under CEQA.
2.1 PROJECT SITE
The following section describes the Project location, existing conditions, surrounding land uses, and regulatory setting.
2.1.1 Project Location
The Project site lies within the central portion of Solano County, approximately 6 miles northeast of downtown Fairfield and 3.8 miles south of downtown Vacaville. Although it is farther from downtown Fairfield than downtown Vacaville, it does lie within Fairfield city limit. The property is near the southeast base of the Vaca Mountains and is generally bounded by an abandoned railroad right-of-way converted to a trail to the south and east, the same trail and Putah South Canal to the north, and Putah South Canal and Waterworks Lane to the west. Existing residential development is across Waterworks Lane to the west, and the One Lake Subdivision lies just east of the trail. The Project extent covers the following Solano County parcels, 0166060200 and 0166020010 (NBRWTP), and 0166202180, 0166020170, and 01365130030 (Linear Trail Pipeline Alignment) and road right-of-way easements, 0136130010, 0128070060, 0128070070, and 0128070080 (Peabody Road Pipeline Alignment).
Regional access to the Project site is provided primarily by Interstate 80 (I-80), a major east-west transportation corridor in Northern California that connects Fairfield with Sacramento to the east and the San Francisco Bay Area to the west. From I-80, local access is provided via Peabody Road to Waterworks Lane, which terminates at the Project site. Additional connections to the regional roadway network are available through State Route 12, located south of downtown Fairfield, which links I-80 to Rio Vista and the Sacramento–San Joaquin Delta region.
Residential areas within Travis Air Force Base lie within 1.5 miles to the southeast of the Project site, and operational portions of the base are within approximately 2 miles.
Figure 2.1 shows the regional and local context of the Project site. Figure 2.2 shows an aerial photograph of the Project site and surrounding land uses.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -2 This page intentionally left blank
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -4 This page intentionally left blank
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -6 This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-7
2.1.2 Existing Conditions
2.1.2.1 Treatment Plant Site
The NBRWTP site (Project site) is partially developed, with vacant areas at the north and south ends of the site. The vacant areas include disturbed and leveled land at the south end, and partially disturbed areas north of the existing photovoltaic array and sludge lagoons. The developed portions of the site are occupied by personnel buildings, operation and maintenance buildings, treatment structures and equipment, sludge lagoons, and a photovoltaic array.
2.1.2.2 Pipeline Alignments
The Project also includes a pipeline that would connect the NBRWTP to the City of Vacaville’s existing water distribution system. Two alternative pipeline alignments are under consideration, the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment, with only one to be selected for implementation. Each alignment would traverse a range of conditions, including developed and unpaved areas of the water treatment plant, the Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. The pipeline would range from approximately 36 to 48 inches in diameter. The final pipeline diameter would be determined during final design based on hydraulic requirements, system demands, and operational considerations.
2.1.2.3 Surrounding Land Uses
As shown on Figure 2-3, the Project site’s surrounding land uses are characterized by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential use. Because this is a utility facility, there are support roads, utility lines, and other service infrastructure in the nearby area. The City’s Municipal Code includes a zoning district known as “PF” (Public Facilities), which is intended to accommodate public or privately constructed uses and facilities that serve a public interest. The PF zoning district is explicitly consistent with the Public Facilities land use designation of the General Plan3 (refer to Figure 2-4: Zoning).
2.2 PROPOSED PROJECT
The Project would expand the capacity and operational efficiency of the existing NBRWTP, a joint effort between the City and the City of Vacaville and would include construction of an associated new Linear Trail pipeline alignment. The Project would expand the total NBRWTP capacity to up to 65 mgd to support buildout under both general plans. The improvements are designed to enhance water treatment reliability, accommodate projected population and service demand, and modernize aging infrastructure to ensure continued regulatory compliance. 3 City of Fairfield. 2024. General Plan and Zoning Maps.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -8 This page intentionally left blank
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -10 This page intentionally left blank
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -12 This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-13 The Project would introduce new treatment facilities, expand the capacity of existing processes, and relocate or modify certain features to improve site function, circulation, and access. See Figure 2-5:
Conceptual Design. Key elements include a new mechanical screen at the Putah South Canal intake structure, pre-ozone contactors, additional flash mixing facilities, additional flocculation/sedimentation basins, additional filters, one or more chlorine contact basins, wash water recovery and clarifier facilities, sludge management lagoons, and upgrades to chemical storage, ozone generation, ozone destruction, and upgraded treated water pumping systems. The Project also includes electrical and control system upgrades to integrate new and existing processes and power systems with the NBRWTP’s Supervisory Control and Data Acquisition (SCADA) monitoring and operational controls, and expansion of the Administration Building. The Project also includes construction of a new treated-water transmission pipeline connecting the NBRWTP to the City of Vacaville’s existing water distribution system. Two alternative pipeline alignments are being considered: the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment.
Construction activities would primarily be within the existing treatment plant property, existing utility corridors, roadway right-of-way, and other previously disturbed areas, with measures implemented to minimize disruption to ongoing plant operations and surrounding land uses.
Overall, the Project is intended to provide a reliable, resilient, and flexible water treatment system capable of meeting the current General Plan buildout for both current and future demand in the Fairfield and Vacaville service areas, supporting long-term water supply sustainability and public health protection.
2.2.1 New Mechanical Screen
A mechanical screen is installed at the existing Putah South Canal intake structure to remove debris from the raw water and protect downstream treatment processes. As part of the expansion Project, a second screen may be installed to provide redundancy. The screen would be sized to treat up to 65 mgd or more of flow.
2.2.2 Three New Pre-Ozone Contactors
To expand the pre-oxidation process, three new pre-ozone contactors would be installed. These units would allow for expanded capacity in managing taste and odor issues and would provide additional protection against a broader range of contaminants. The three new pre-ozone contactors would be installed to increase the NBRWTP’s capacity for oxidation prior to filtration. The contactors would consist of basins or vessels designed to provide adequate ozone contact time for treated water. Construction would include excavation, basin construction, installation of ozone feed piping, valves, and instrumentation, as well as tie-ins to the existing ozonation system. Safety protocols, access routes, and temporary construction controls would be implemented to ensure worker safety and operational continuity. During operation, the contactors would be monitored via SCADA, with routine inspections and maintenance of ozone injection equipment, diffusers, and structural components. The new contactors would provide improved pathogen removal and enhanced treatment flexibility.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -14 This page intentionally left blank
Approximate Footprint
of New Facility Required
for Expansion to 65 MGD
FIGURE 2-5
Conceptual Design
North Bay Regional Water Treatment Plant
Fairfield, Solano County, California
SOURCE: West Yost
LEGEND
I:\2025\20252567.02\G\Conceptual_Design.ai (8/10/2026)
FEET
0 200 400
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -16 This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-17 The three new ozone contact basins will be constructed of concrete and are anticipated to have a footprint of approximately 70 feet by 20 feet each, with a side-water depth of 20 feet. Each contact basin is anticipated to be designed to contain a volume of approximately 54,000 gallons. The contact basins will include baffles to promote counter-current contact with the ozone gas. Due to the excavation depth of approximately 25 feet, shoring would be required to support the ozone contact basin excavation area. The ozone feed piping would be stainless steel. Electrical service would be extended to the new ozone contact basins to provide power to equipment and instruments.
Ceramic dome diffusers are anticipated to be used for ozone diffusion, and air purge blowers would be provided into the contact basins. Ozone destruct units would be provided to manage gas from the contact basin headspace. Ozone gas control valves would be provided, as well as instrumentation such as ozone gas flow meters and ozone concentration meters.
2.2.3 New Flash Mix Process
A new flash mix process would be constructed to provide coagulation of the incoming water. The train would consist of one or more rapid-mix basins equipped with hydraulic pumped mixing to ensure uniform distribution of coagulants and effective particle destabilization. Construction would involve grading, excavation, foundation preparation, basin construction, mechanical installation of mixers, and integration with the NBRWTP’s existing pretreatment and chemical feed systems.
Temporary staging areas, access routes, and erosion/dust control measures would be implemented to minimize environmental impacts during construction.
During operation, the flash mix train would be continuously monitored to ensure proper mixing and coagulant distribution. Routine maintenance would include inspection and lubrication of mixing equipment, structural inspections of the basins, and calibration of chemical feed systems. Safety features such as emergency stops, lockout/tagout procedures, and controlled access would be provided. The new flash mix train would enhance overall treatment efficiency, supporting downstream processes and ensuring compliance with water quality standards.
The vault housing the flash mix mechanical equipment would likely be designed to have similar dimensions as the existing flash mix vault, would be approximately 30 feet by 15 feet, and would be constructed of reinforced concrete. Foundation and subgrade preparation will be determined at time of design. Water would flow to the flash mix from the pre-ozone contactors. Following flash mixing, the water would flow into the flocculation/sedimentation basin influent distribution channel. A pump would be used to provide the mixing energy needed for coagulation and disbursement of other chemicals injected into the flow stream at the flash mix. Chemicals are anticipated to be injected through inline diffusers installed within the pipeline and may include aluminum sulfate (alum), polymer, and sodium hypochlorite. Additionally, a sample pump may be installed to convey a sample of water to the laboratory.
2.2.4 Three New Flocculation/Sedimentation Basins
Up to three new pretreatment trains would be added to expand the NBRWTP’s pretreatment capacity. These trains would provide removal of suspended solids and organic content and enhance treatment reliability, particularly during periods of high demand or variable source water quality.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -18 The new pretreatment trains would be installed to expand the NBRWTP’s ability to remove suspended solids and other contaminants prior to downstream treatment processes. Each train would consist of flocculation and sedimentation basins designed to handle anticipated peak flows.
Construction would include site grading, excavation, installation of concrete basins, piping connections, installation of mechanical equipment (e.g., mixers and pumps), and integration with the existing NBRWTP process. Temporary staging areas and traffic management would be implemented to minimize disruption to ongoing operations. Operation of the pretreatment trains would involve continuous monitoring, chemical feed and dosing as needed, routine maintenance of mechanical and electrical equipment, and regular inspection of structural components to ensure consistent performance.
Each train would likely be similar to the existing trains, which are constructed of reinforced concrete, are approximately 300 feet by 40 feet, and have a volume of approximately 190,000 gallons. Soil conditions would be evaluated during design to determine site preparation and footing requirements. Any temporary shutdowns or bypass requirements would depend upon the final design and configuration of piping and structures.
2.2.5 New Filters
Up to eight filters would be constructed to expand the NBRWTP’s filtration capacity. This addition will support higher treatment volumes and improve overall water quality reliability for customers served by the NBRWTP. Each filter unit includes basins, media, underdrains, piping, instrumentation, and control systems. Construction would include excavation, concrete basin construction, mechanical and electrical installation, and tie-ins to existing NBRWTP processes. Access routes, staging areas, and dust/noise controls would be determined during design and implemented during construction. Operation would include routine backwashing, inspection and maintenance of filter media and mechanical systems, and monitoring of flow and water quality parameters. The filters would increase treatment reliability and ensure high-quality finished water.
2.2.6 New Wash Water Equalization Basin
A new wash water recovery equalization basin would be constructed to capture and recycle waste streams generated during NBRWTP operations, including filtering backwash water, settled solids, and decant water from the Sludge Lagoons. This facility would support water conservation by reducing wastewater discharge volumes and reusing water within the treatment process. The new wash water equalization basin would be constructed within the treatment NBRWTP property to capture and recycle water generated during NBRWTP operations. The basin would be designed with sufficient storage capacity to accommodate typical daily flows and would provide temporary storage for cleaning and processing water prior to treatment or reuse. Construction would involve site grading, excavation, and foundation preparation, with the basin structure likely composed of reinforced concrete. Utility connections, including inlet and outlet piping, valves, and meters, would be installed to integrate the basin with existing NBRWTP systems. Pumps and associated mechanical equipment would transfer recovered water to clarifiers or back into the treatment process. During construction, staging areas, access routes, and temporary erosion and dust controls will minimize environmental and impacts.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-19 Operation of the wash water equalization basin would involve routine monitoring of water levels and quality through SCADA and on-site sensors. Regular maintenance, including removal of accumulated solids and inspection of structural and mechanical components would ensure continued functionality. Safety features, such as overflow protection and restricted access, would protect personnel, and odor and vector control measures would be implemented as needed. The basin would support NBRWTP water conservation by reducing overall wastewater discharge and reusing process water, and operational procedures would include scheduled inspections, routine cleaning, and equipment maintenance to maintain the system’s reliability over its expected operational life. The new equalization basin is anticipated to be constructed of reinforced concrete and be approximately 80 feet by 80 feet and 12 feet deep to provide a storage volume of approximately 630,000 gallons. Foundation and subgrade preparation would be evaluated during design as well as excavation, shoring, grading, soil compaction, and groundwater dewatering needs.
Piping conveying the waste streams to the existing wash water recovery basin would be extended to the new equalization basin. Electrical power would also be extended to the new facility. New piping to the wash water clarifiers would be installed from the equalization basin facility. A pump would be required to transfer water from the equalization basin to the wash water clarifiers for treatment.
Excavators, concrete pumps, and hauling trucks are anticipated to be used in the construction of the facility. The area adjacent to the existing wash water recovery basin may be used for site access and construction staging.
2.2.7 New Wash Water Clarifiers
Approximately three new wash water clarifiers would be built to treat the equalized wash water stream prior to returning the recovered water to the head of the treatment process. These units would enhance solids removal efficiency. The new wash water clarifiers would be installed to settle solids from the wash water before it is returned to the process. Each clarifier would be constructed with basins, inlets, outlets, and associated piping, along with pumps and valves as needed.
Construction would include grading, excavation, basin construction, mechanical installation, and tie-ins to the wash water recovery basin. Temporary access, staging, and erosion control would be implemented. Operation would involve continuous monitoring, periodic sludge removal, inspection of mechanical components, and preventative maintenance to ensure reliable performance. The clarifiers would enhance solids removal efficiency and support water recycling efforts.
2.2.8 New Sludge Lagoons
Up to two new sludge lagoons would be constructed to provide additional capacity for management of solids residuals generated during the treatment process. These lagoons would be within the NBRWTP property and designed to ensure compliance with applicable water quality and operational standards.
Each lagoon would be designed with sufficient depth and volume to safely contain sludge under normal operations and during storm events and would include engineered liners and berms to prevent seepage and protect groundwater. Construction would involve grading, excavation, liner installation, and berm construction, with associated utility connections for sludge transfer. Access roads and safety features would be provided for operation and maintenance activities. Operation of the lagoons includes routine solids monitoring, solids removal, inspection of liners and berms, and
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -20 adherence to safety and environmental regulations. The lagoons support ongoing treatment operations by providing reliable storage and management of treatment residuals.
The surface area of each new sludge lagoon is anticipated to be approximately 100,000 square feet, with a total depth of 8 feet. The operational depth of the lagoons is anticipated to be 4 feet. The total active storage volume is anticipated to be approximately 400,000 cubic feet, with design freeboard for storm events. Lagoons are anticipated to be constructed with a 3:1 side slope to match the slopes of the existing lagoons. No secondary containment is currently anticipated.
The soil type to be used, as well as the need for cutoff or slurry walls, would be determined during design. Stormwater would not be routed to the lagoons. A sludge inlet structure with a splash pad would be provided at each lagoon. An outlet decant return structure will be provided at each lagoon. A new pump station will be constructed to replace the existing decant pump station to transfer the decant water back to the main treatment NBRWTP. Pumps would likely be submersible type. Underdrains and sump/collection piping for leak detection or dewatering would be included, if necessary, but are not anticipated to be needed.
The sludge lagoons would receive residual solids from the residuals handling process. Clarified water from the top of the sludge lagoons would be returned to the treatment process via a clarified water pipeline and pump station. Power would be provided in the vicinity of the sludge lagoons to provide electrical service for lighting and pump station facilities. Utility water service would be extended to the new lagoons. Accumulated solids would be periodically removed from the lagoons.
2.2.9 Increase in Capacity for Existing Chemical Storage Tanks The Project would include an increase in capacity for existing chemical storage tanks to support expanded treatment operations. Construction would involve installation of new or expanded tanks on reinforced foundations, with associated piping, pumps, valves, and instrumentation to integrate with existing chemical feed systems. Temporary construction access and staging areas would be provided, and all construction activities would follow appropriate safety and environmental controls. During operation, the upgraded tanks would allow for more reliable storage and dosing of treatment chemicals, with routine monitoring, inspection, and maintenance performed to ensure system safety and compliance. Secondary containment and spill prevention measures would minimize the risk of environmental releases, and SCADA integration would allow operators to continuously monitor chemical levels and flow.
Construction would include vertical or horizontal chemical storage tanks and would be chemically compatible with the chemical stored within the tank, and may include polyethylene, fiberglass reinforced plastic, or carbon steel. Chemical storage tanks would be sized to minimize partial load deliveries of chemicals. The structure of the chemical storage area may be modified to enhance secondary containment, chemical segregation, and accommodate the anticipated loads of the new tanks. Reinforced concrete pads, plinths, or other supports would be constructed for each new tank.
Chemical piping, valves, flow meters, recirculation pumps, and metering pumps are anticipated to be replaced. Construction methods may include the use of cranes to install the chemical storage tanks, concrete work, and welding.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-21
2.2.10 New Ozone Generators
Approximately two new ozone generators would be installed to provide ozone gas to the pre-ozonation system for organics oxidation and taste and odor control. Each generator would include the ozone generation unit, feed gas supply system, power and control equipment, and associated ventilation and safety systems. Construction would include site preparation, foundation work, electrical and utility tie-ins, and installation of mechanical components, with staging areas and equipment access coordinated to minimize disruption. Operation would involve monitoring ozone production, adjusting dosage, maintaining electrodes and power supply systems, and performing routine inspections and preventative maintenance. Safety measures, including ozone leak detection and off-gas destruction, would ensure compliance with environmental and occupational health standards. The new generators would enhance treatment reliability.
The new generators are estimated to have a production capacity of approximately 670 pounds of ozone per day and are anticipated to be fed liquid oxygen from the existing liquid oxygen storage tanks. They would be installed within the existing Ozone Generation Building. New equipment pads would be constructed for the generators. Modifications to the electrical infrastructure may be required to supply power to the new ozone generators. The generators would be cooled using a closed-loop cooling water system. Expansion of the existing closed-loop cooling water system may be required to supply sufficient cooling water to the new ozone generators. Liquid oxygen from the existing liquid oxygen storage tanks and vaporizers would be supplied to the new ozone generators.
The existing concrete floor of the Ozone Generation Building may need to be cut to create trenches for process piping and electrical conduit. Utilities within the existing Ozone Generation Building, including power, oxygen supply, ozone, cooling water, and others, would need to be extended to the new ozone generators.
2.2.11 Relocation of the Filter Gallery Access Ramp
The existing filter gallery access ramp may be extended to provide access to the expanded, below-grade filter gallery. Alternatively, access to the expanded filter gallery may be provided by an access hatch through which a forklift or other equipment could be lowered for use within the gallery.
Construction would include grading, paving, and installation of guardrails or curbs, with temporary access measures implemented to maintain operational access during construction. Operation would involve routine inspection and maintenance of pavement, drainage, and safety features to ensure safe and reliable access for personnel and vehicles.
2.2.12 New Chlorine Contact Basin
One or two new chlorine contact basins would be constructed to provide additional disinfection capacity and ensure regulatory compliance. Construction would include excavation, foundation preparation, basin construction, installation of inlet/outlet piping, and integration with chemical feed systems and instrumentation and monitoring systems. Temporary construction controls would be implemented to maintain ongoing operations and minimize environmental impacts. Operation would involve monitoring chlorine concentration, pH, temperature, and flow rate; maintaining chemical feed and mechanical systems; and performing routine inspections and maintenance to ensure consistent water quality and safety.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -22
2.2.13 Golden Mussel Control Facilities
To protect NBRWTP facilities from potential damage or loss of treatment capacity associated with the invasive golden mussel (Limnoperna fortunei), the Project would include provisions for ozone treatment of raw water at one or both raw water intake locations within the existing NBRWTP boundary.
4 Improvements may include installation of small-diameter ozone conveyance piping, side-stream pumping, ozone injection equipment, ozone gas and residual monitoring equipment, associated electrical, instrumentation, controls, and access provisions, as necessary. Existing raw-water pipelines may also be inspected and localized pipeline lining, seals, elastomers, or other components replaced or modified where necessary for compatibility with elevated ozone exposure.
The Cities may initially construct the ozone injection facilities at only one intake location, with improvements at the second intake constructed in the future if necessary to control golden mussel growth and maintain plant capacity. All improvements would occur within the existing NBRWTP boundary.
Ozone is already generated and used as part of the NBRWTP water treatment process, and the proposed improvements would extend the existing treatment capability to the raw water intake system. Ozone generation, conveyance, injection, monitoring, and associated equipment would be designed and operated in accordance with applicable regulatory requirements and NBRWTP operating and safety procedures.
2.2.14 Increased Treated Water Pump Station Capacity
The treated water pump station would be upgraded to increase capacity for delivering treated water to the cities’ distribution systems. Construction would include installation of additional pumps and/or pumps with higher capacity, piping, valves, electrical connections, and controls, with coordination to minimize service interruptions. Operation would involve routine monitoring of flow and pressure, maintenance of pumps and electrical equipment, and implementation of preventative maintenance schedules. The upgraded pump station would ensure reliable delivery of treated water to meet projected demand.
2.2.15 New Vacaville Pipeline Connection
Two practicable transmission pipeline alignments are being considered to convey treated water from the NBRWTP to the City of Vacaville’s existing distribution system: the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. The proposed transmission pipeline would range from approximately 36 to 48 inches in diameter, with the final pipeline diameter determined during final design based on hydraulic requirements, system demands, and operational considerations. The two pipeline alignments are described in further detail below.
2.2.15.1 Linear Trail Pipeline Alignment
The Linear Trail pipeline alignment would consist of a new transmission pipeline from the NBRWTP that would follow the same route as the existing 30-inch transmission main that currently delivers treated water from the NBRWTP to Vacaville (as shown on Figure 2-2). The total length of this alignment is approximately 9,100 linear feet from the north boundary of the NBRWTP to the 4 City of Fairfield. 2026. Water Treatment Plants Golden Mussel Vulnerability Study. July 2026.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-23 endpoint at the intersection of Peabody Road and Foxboro Parkway. The first approximately 8,100 linear feet of this alignment generally parallels Putah South Canal and the old railroad right-of-way (known as the Linear Trail), whereas the last roughly 1,000 linear feet of the alignment would be along Peabody Road.
The alignment would have two notable crossings, in addition to a likely storm drain crossing on Peabody Road. The first crossing would be at Putah South Canal (approximately 4,400 linear feet north of the north boundary of the NBRWTP), where the canal passes through an existing box culvert at an access road crossing. The new transmission main will cross over the culvert, consistent with the existing transmission main alignment. The second crossing would be beneath the outlet of a 12-acre stormwater detention basin, crossing Union Creek, and east of Peabody Road and abutting the southern boundary of Vacaville. At this crossing, the existing 30-inch-diameter transmission main drops down approximately 20 vertical feet to pass beneath the detention basin outlet.
In addition to the known crossings, potential utility conflicts may exist along Peabody Road, including non-City utilities such as gas, electricity, and telecommunications. Surface observations do not indicate the presence of any such utilities, but a detailed utilities investigation would be needed at the predesign stage.
The entire pipeline route would be accessible by vehicle for emergency repair and routine maintenance. Outside of paved roadways, the existing all-weather access would be restored and widened as necessary to a width of approximately 20 feet.
Hydraulic modeling indicates that the Linear Trail alignment is capable of meeting system pressure and velocity criteria when combined with identified supporting system improvements. A future water main extending from the intersection with Foxboro Parkway to the intersection of California Avenue (identified in the City’s 2023 Water System Master Plan ) would need to be a 30-inch diameter pipe rather than the currently planned 24-inch diameter pipe. In addition, a planned 24- inch diameter water main along California Avenue and Butcher Road (also identified in the 2023 Water Master Plan) would need to be in place.
2.2.15.2 Peabody Road Pipeline Alignment
The Peabody Road Pipeline Alignment would consist of a new transmission pipeline from the NBRWTP that would extend west toward Peabody Road across Putah South Canal and the north along Peabody Road to the intersection of Foxboro Parkway and Peabody Road as shown in Figure 2-2. The total length of this alignment is approximately 9,500 linear feet from the northern boundary of the NBRWTP to the endpoint at the intersection of Peabody Road and Foxboro Parkway.
The alignment would cross the Putah South Canal in one location via a pipeline bridge structure or by installing the pipeline beneath the canal using horizontal directional drilling (HDD), a trenchless installation method, and would include at least four culvert crossings within Peabody Road, including one County of Solano crossing and three utility crossings. The pipeline would be constructed partially within pavement and partially off-pavement. Off-pavement construction might
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -24 require temporary or permanent encroachment on private property requiring landowner approval and easements.
In addition to the known crossings, potential utility conflicts may exist along Peabody Road, including non-City utilities such as gas, electricity, and telecommunications. Surface observations do not indicate the presence of any such utilities, but a detailed utilities investigation would be needed at the predesign stage.
Hydraulic modeling indicates that the Peabody Road alignment is capable of meeting system pressure and velocity criteria when combined with identified supporting system improvements. A future water main extending from the intersection with Foxboro Parkway to the intersection of California Avenue (identified in the City’s 2023 Water System Master Plan5 ) would need to be a 30-
inch diameter pipe rather than the currently planned 24-inch diameter pipe.
2.2.16 Energy Infrastructure – Microgrid System
The Project includes installation and operation of an on-site microgrid system to provide reliable and resilient electrical power for the NBRWTP. The microgrid would consist of a microgrid controller, up to three battery energy storage systems (BESS), one or more new diesel-fueled emergency generators, communication and coordination with the on-site photovoltaic array and associated electrical distribution and control equipment. The microgrid controller would serve as the central control unit, automatically managing power flows between the facility’s electrical loads, each BESS, the diesel generators, the photovoltaic array, and the utility grid. The controller would monitor grid status and energy demand to coordinate operation of the different power sources and maintain system stability. Each BESS unit would be located within a secure portion of the Project site, and each unit will be housed in its own prefabricated, weatherproof enclosure. The system would have a storage capacity of approximately 11.7 megawatt-hours and an operational footprint of approximately 2,900 square feet. Each BESS would charge during periods of low energy demand or when excess solar or grid power is available, and discharge as needed to offset demand or during grid outages.
The diesel-fueled generators would provide backup power for critical treatment processes during extended outages or when battery storage is depleted. Generator use would be limited to outage conditions and periodic testing and maintenance, consistent with air quality permit requirements issued by the local air district. Fuel for the generators would be stored in double-walled aboveground storage tanks with secondary containment.
All microgrid components, including the controller, BESS, generators, and switchgear, would be located within the existing developed portion of the NBRWTP site. Electrical connections would be tied into the facility’s existing electrical distribution system. No substantial grading, vegetation removal, or expansion of the facility footprint would be required for installation. 5 City of Vacaville. 2023. City of Vacaville Water Master Plan. February.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-25 The microgrid system would comply with applicable California Building Code, California Electrical Code, and fire safety standards. The system would be designed and installed in coordination with the local utility to meet interconnection requirements and ensure safe and reliable operation.
2.2.17 Electrical and Control Upgrades
The Project would include electrical and control system upgrades to support the expanded treatment NBRWTP operations. Construction would involve installation of new switchgear, control panels, wiring, conduit, and integration with SCADA and monitoring systems for new treatment components. Temporary measures would ensure continued operation of the NBRWTP during installation, and all work would comply with safety and electrical codes. Once operational, the upgraded electrical and control systems would provide enhanced monitoring and control of treatment processes, including flow, pressure, and chemical dosing. Routine inspections and maintenance would ensure system reliability, and backup power and redundancy measures would minimize the risk of service interruptions.
2.2.18 Expanded Operations Building
The Project would include upgrades to and expansion of the existing 12,000-square-foot Operations Building. Upgrades are anticipated to include changes associated with compliance with the latest Americans with Disabilities Act requirements, expansion of the existing conference room or construction of a new expanded conference room, expansion of office space for information technology and maintenance staff or construction of new expanded workspace for these staff, expansion of the operations control room or construction of a new expanded control room, expansion of break room facilities or construction of new expanded break room facilities, expansion of the server room or construction of a new expanded server room, repair of roof and windows to address leaks, and replacement of heating, ventilation, and air conditioning (HVAC) systems.
Expansions would add approximately 10,000 square feet of operational space to the existing Operations Building. Additions to the existing Operations Building structure may be required to create space for additional office space and communal working spaces. Aesthetic upgrades are anticipated to be made to all interior spaces.
2.2.19 Vegetation Removal and Landscape Improvements
Implementation of the Project may require the removal of existing vegetation within the Project footprint, including grasses, shrubs, and trees associated with developed and undeveloped areas of the NBRWTP and along the proposed pipeline alignments. Vegetation removal would be limited to the minimum area necessary to accommodate construction, access, and long-term operation and maintenance requirements.
Several groupings of trees are within the Project area, including landscaped plantings and potential grove-like clusters. These trees are on public property and may qualify as Protected Trees pursuant to the City’s tree ordinance (Section 25.36), which generally designates all trees on public property as protected regardless of original funding source. Therefore, removal of any trees would be subject to applicable local regulations and permitting requirements. Where feasible, existing trees will be avoided and protected in place.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -26 Following construction, disturbed areas would be restored and stabilized. Landscape improvements may include replanting trees, shrubs, and groundcover consistent with City standards, mitigation requirements, and site-specific conditions. Replacement planting would be designed to maintain or enhance existing landscape functions, where feasible, while ensuring compatibility with Project infrastructure and operational needs.
2.3 CONSTRUCTION EQUIPMENT
Construction of the NBRWTP expansion would require a variety of equipment to support grading, excavation, concrete and steel work, mechanical and electrical installation, and pipeline construction. Equipment would be staged on-site and in designated laydown areas, and temporary access roads would facilitate the movement of machinery throughout the construction zones. Use of this equipment would be limited to the active construction areas and scheduled during standard work hours to minimize noise and air quality impacts. Construction equipment would be operated by trained personnel, would be maintained regularly, and would comply with all safety regulations, including those for dust, exhaust emissions, and vibration.
The selection of equipment would be tailored to the specific activities, such as excavation for basins, construction of buildings and cast-in-place concrete structures, installation of large tanks and equipment, grading and paving, and placement of heavy mechanical components. Smaller equipment and tools would also be used for mechanical, electrical, and instrumentation installation tasks. Appropriate traffic, safety, and environmental controls would be implemented to protect workers, nearby communities, and sensitive resources during construction. • Earthwork and Grading:
○ Excavators (standard and long-reach)
○ Bulldozers
○ Front-end loaders
○ Backhoes
○ Skid-steer loaders
○ Motor graders
○ Compactors/rollers
○ Scrapers (for large soil movement)
• Concrete and Structural Work:
○ Concrete pumps
○ Concrete mixers/trucks
○ Crane trucks (mobile cranes for lifting tanks, ozone generators, etc.) ○ Hoists and lifts
○ Vibrators and screeds
○ Formwork equipment (panels, supports, and braces)
• Mechanical and Piping Installation:
○ Forklifts
○ Small mobile cranes
○ Welding equipment (arc welders, MIG/TIG, and oxy-acetylene)
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-27 ○ Pipe threading and cutting machines
○ Bolt tensioners and torque tools
• Electrical and Instrumentation Work:
○ Lifts/aerial work platforms (e.g., manlifts, cherry pickers) ○ Cable pullers and reels
○ Testing and calibration instruments (multimeters, insulation testers) • Hauling and Material Transport:
○ Dump trucks (soil, aggregate, and construction debris) ○ Flatbed trucks (equipment and prefabricated tanks)
○ Water trucks (dust suppression)
• Miscellaneous/Support Equipment:
○ Generators (temporary power for tools and site lighting) ○ Compressors
○ Pumps (e.g., dewatering, temporary construction)
○ Portable lighting towers
○ Safety barriers, signage, and fencing
2.4 CONSTRUCTION STAGING AND PARKING AREAS
Construction of the NBRWTP expansion would require designated staging and parking areas to support equipment storage, material laydown, and employee vehicles. Staging areas would be within the existing NBRWTP property and, where necessary, within adjacent utility corridors, minimizing disturbance to surrounding land uses and sensitive resources. These areas would be used to store construction equipment, prefabricated components, construction materials such as concrete, steel, and piping, and temporary site facilities such as trailers and portable restrooms.
Parking for construction personnel would be provided on-site in designated areas to reduce off-site traffic impacts and maintain safe access to the NBRWTP and nearby roadways. Construction activities would be coordinated to ensure that staging and parking areas do not interfere with ongoing NBRWTP operations or create unsafe conditions for workers or the public. Temporary erosion, sediment, and dust control measures would be implemented to minimize environmental impacts, and all equipment and materials would be secured at the end of each workday.
The entire fenced area of the NBRWTP site is available for potential staging and parking areas during construction. The layout and use of staging and parking areas would be adapted as construction progresses, with areas released for restoration or operational use once specific Project components are completed. This approach ensures efficient construction logistics while maintaining compliance with safety, environmental, and operational requirements.
2.5 OPERATIONAL STAFFING AND VEHICLE TRIPS
The expanded NBRWTP would continue to operate on a year-round basis to provide reliable water treatment to Fairfield and Vacaville. Operation of the new and upgraded treatment facilities would require additional staff. The following additional personnel may be required, subject to adjustment based on further study of staffing needs:
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -28 • One to two additional administrative staff
• Two to three additional operational staff
• Two to three additional maintenance staff
• Two to three additional electrical, instrumentation, and control staff • Two to three additional laboratory staff
• Two to three additional operations management staff
Operational procedures would include continuous monitoring via SCADA, routine equipment inspections, preventive maintenance, and compliance with applicable water quality and safety regulations. The additional operational staffing and resources would ensure that NBRWTP maintains efficient, safe, and reliable service while meeting projected demand and regulatory requirements.
Routine operations of the expanded facility would result in additional chemical delivery trips; chemical delivery trips are estimated to increase from approximately 250 deliveries per year to 550 deliveries per year. Additional vehicle trips would be associated with employee commutes, service vehicles, and delivery of supplies.
2.6 CONSTRUCTION SCHEDULE
Construction of the Project is anticipated to begin in early 2027 and continue through approximately 2033. The construction schedule may be adjusted based on completion of final design, permitting, funding availability, contractor scheduling, weather conditions, and other implementation considerations. Such schedule refinements would not alter the Project components or the environmental analysis presented in this IS/MND.
Major construction activities would include grading, excavation, structural work, mechanical and electrical equipment installation, piping and utility tie-ins, and paving or access improvements.
Temporary construction staging areas would be provided within the NBRWTP property or adjacent corridors, and all construction would comply with safety, noise, dust, and traffic control requirements. Construction activities would generally occur during standard daytime hours, with occasional extended hours or weekend work as needed to maintain Project schedule and operational continuity.
2.7 PROJECT APPROVALS
Although the City is the CEQA Lead Agency for the Project, other public agencies and private entities may also have approval authority or serve as a responsible and/or trustee agency. Table 2.A provides a list of these agencies and the potential permits and approvals required.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 2-29 Table 2.A: Potential Permits and Approvals
Lead Agency Permits/Approvals
City of Fairfield IS/MND Approval and Adoption of MMRP Development Plan Review
Grading Permit
Encroachment Permit
Building Permit
Public Works – Traffic Plan
Tree Removal Permit or Authorization
Other Responsible/Trustee Agencies
City of Vacaville Approval and agreement with City of Fairfield’s IS/MND and MMRP findings
City of Fairfield Fire Department CUPA and Hazardous Materials Handling/Storage Permits Bay Area Air District TBD
United States Army Corps of Engineers CWA Section 404 Nationwide Permits and/or Individual Permit Section 7 and Section 106 Consultation
Regional Water Quality Control Board CWA Section 401 Certification or Waste Discharge Permit California Department of Fish and Wildlife Lake or Streambed Alteration Agreement Incidental Take Permit
United States Fish and Wildlife Service Section 7 Consultation and/or Take Permit Source: Compiled by LSA (2025).
CUPA = Certified Unified Program Agencies
CWA = Clean Water Act
IS/MND = Initial Study/Mitigated Negative Declaration
MMRP = Mitigation Monitoring and Reporting Program
SCWA = Solano County Water Agency
TBD = to be determined
USBR = United States Bureau of Reclamation
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
2 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -30 This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 3-1
3.0 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a “Potentially Significant Impact” as indicated by the checklist in Chapter 3.0.
Aesthetics Agriculture and Forestry Resources Air Quality Biological Resources Cultural Resources Energy
Geology/Soils Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services
Recreation Transportation Tribal Cultural Resources
Utilities/Service Systems Wildfire Mandatory Findings of Significance
3.1 DETERMINATION
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a “Potentially Significant Impact” or “Potentially Significant Unless Mitigated” impact on the environment, but at least one effect (1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and (2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
Signature Date
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
3 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -2 This page intentionally left blank
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-1
4.0 CEQA ENVIRONMENTAL CHECKLIST
4.1 AESTHETICS
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Except as provided in Public Resources Code Section 21099, would the project:
a. Have a substantial adverse effect on a scenic vista? b. Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway
c. In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from a publicly accessible vantage point.) If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
d. Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
4.1.1 Baseline Conditions
4.1.1.1 Visual Character
The existing visual character of the North Bay Regional Water Treatment Plant (NBRWTP) site is utilitarian and industrial in nature, reflecting its long-standing use as an operational public utility facility. The site is currently developed with treatment structures, tanks, pipelines, pump stations, maintenance areas, internal access roads, security fencing, lighting, and other supporting infrastructure associated with water treatment operations. The surrounding area is characterized by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses, and the facility is visually consistent with the broader developed setting. Public views of the facility are limited mostly to Waterworks Lane, adjacent service roads and perimeter vantage points; there is little residential frontage immediately adjacent to the site, which reduces viewer sensitivity. The facility’s color, scale and massing align with the public utilities/industrial character of the site and the broader planning context of this part of Fairfield.
The Project would be within and adjacent to the existing NBRWTP footprint on land already designated, zoned, and planned for continued water treatment and public utility operations, including future facility expansion and supporting infrastructure improvements. Because the site is already developed for utility purposes and accommodates existing treatment operations, the Project would represent an expansion and modernization of an existing facility rather than the introduction of a new industrial use into an undeveloped or visually sensitive area.
The Project also includes a pipeline connecting the NBRWTP to the City of Vacaville’s existing water distribution system. Two alternative pipeline alignments are under consideration: the Trail
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -2 Alignment and the Peabody Road Alignment, with only one to be selected for implementation. Each alignment would be underground and would traverse a range of conditions, including developed and unpaved areas of the water treatment NBRWTP, across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. The setting therefore supports a baseline condition of low aesthetic sensitivity for the public, consistent with the industrial/utility land-use designation.
4.1.1.2 Scenic Routes/Viewpoints
In terms of scenic resources and designated scenic routes, the Project is not within a formally designated “State scenic highway” corridor, and visible viewpoints from major public scenic corridors are minimal. The nearest major transportation routes serve industrial or utility-oriented land rather than scenic tourism corridors. Therefore, the visual setting does not include high-sensitivity scenic vistas or heavily traveled scenic corridors that would place elevated emphasis on view protection. Public vantage points are largely local roadways or utility access drives rather than vantage locations recognized for scenic quality in the adopted Fairfield Forward 2050 General Plan or associated Program EIR. The baseline therefore reflects limited exposure of the facility to high-sensitivity scenic viewers, and the absence of a primary scenic viewpoint context.
4.1.1.3 Light and Glare
The current facility operates under standard utility-scale lighting practices. Exterior lighting is primarily oriented toward functional tasks, security and maintenance (e.g., building access, perimeter fencing, treatment NBRWTP operations) rather than aesthetic accent lighting. Existing light levels and sources are typical for an industrial site and include mounted floodlights, perimeter wall-mounted fixtures and process area lighting, some of which may produce glare from metal structures or reflective surfaces (e.g., tanks, piping). Adjacent land uses are able to absorb such lighting given the low density and non-sensitive viewer context (few immediate residences or public gathering spaces). The baseline therefore encompasses an environment with moderate ambient lighting and occasional glare consistent with an existing utility/industrial facility, rather than a dark-sky, low-glare suburban or residential setting.
In accordance with the City’s design and development standards, exterior lighting at public facilities is required to be fully shielded and directed downward to minimize light trespass onto adjacent properties and prevent unnecessary sky glow. Fixtures are typically equipped with cut-off shields or are recessed to control light dispersion, and illumination levels are maintained only as necessary for safety and security. These practices are consistent with the City of Fairfield’s (City) General Plan policies and Municipal Code requirements aimed at reducing glare and spillover lighting from new and existing development.
Although some light may be visible from nearby residential neighborhoods to the east and the west, existing lighting is largely contained within the facility and consistent with City standards for industrial and utility uses. The baseline therefore encompasses an environment with moderate ambient lighting and occasional localized glare typical of an established water-treatment facility operating under modern lighting-design requirements, rather than a dark-sky or low-glare residential setting.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-3
4.1.2 Regulatory Requirements
4.1.2.1 Federal Regulations
There are no federal policies or regulations related to aesthetics that are applicable to the Project.
4.1.2.2 State Regulations
Caltrans Scenic Highway Program. The California Department of Transportation (Caltrans) Scenic Highway Program, established in 1963 under Senate Bill 1467, protects the natural scenic beauty of the State’s highways and corridors through its designated scenic highways throughout the State.
Caltrans defines a scenic highway as any freeway, highway, road, or other public right of way that traverses an area of outstanding scenic quality, containing striking views, flora, geology, and other unique natural attributes. Other considerations given to a scenic highway designation include how much of the natural landscape a traveler may see and the extent to which visual intrusions degrade the scenic corridor. This program is codified in Sections 260 through 263 of the California Streets and Highways Code.
Title 24 Outdoor Lighting Zones. California’s Building Energy Efficiency Standards establish requirements for outdoor lighting in both residential and non-residential projects. These standards are intended to enhance outdoor lighting quality while minimizing light pollution, light spillover onto adjacent properties, and glare. They address factors such as allowable lighting power and intensity, required shielding, and the use of controls (e.g., sensors or timers) to regulate when lights operate.
Lighting requirements vary by designated lighting zone, which is determined based on population data from the United States Census Bureau. Areas are categorized into five zones: LZ0 (very low), LZ1 (low), LZ2 (moderate). LZ3 (moderately high), and LZ4 (high).
4.1.2.3 Regional/Local
City of Fairfield General Plan. 6
• Goal LU-6. Minimize conflicts between land uses in Fairfield and promote development that is sensitive to its environmental and scenic context.
○ Policy LU-6.1. Land Use Compatibility. Require industrial and commercial development to minimize noise, heat, glare, dust, and odor impacts on adjacent uses ○ Policy LU-6.6. Avoid View Encroachment. Restrict development from significantly encroaching on public views of ridgelines, agricultural areas, the Cement Hill Range, and the Suisun Marsh.
6 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -4 ○ Policy LU-6.7. Scenic Vistas and Roadways. Any development in a Scenic Vista Area or along a scenic roadway shall not obstruct significant views. Refer to the city’s Scenic Vistas and Roadways Plan for a complete set of standards for preserving designated scenic vista areas and scenic roadways.
○ Policy LU-6.8. Lighting Standards. Prepare a City Lighting Standards study to determine visibility, minimum glare, and minimum spillage standards in relation to other properties or into the sky.
City of Vacaville General Plan.
• Goal LU-1. Preserve, promote, and protect the existing character and quality of life within Vacaville.
City of Fairfield Municipal Code.
Section 25.30.4 Outdoor Lighting. This section of the City of Fairfield Municipal Code provides requirements for the placement of outdoor lighting and requires the following:
• lighting must be shielded or recessed so that direct light, glare, and reflections are confined to the maximum extent feasible within the boundaries of the site • lighting must be directed downward and away from adjacent residential properties and public rights-of -way
• that no permanently installed light blink, flash, or be of unusually high intensity or brightness
• and all lighting fixtures must be of appropriate intensity, scale, and height to the use they are serving so as to avoid creating unreasonable impacts on surrounding property or to draw attention to a property in an unreasonable manner.
4.1.3 Impact Analysis
The Project includes upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments, which are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment, which are further described in Section 2.0, Project Description. Each alignment would traverse a range of conditions, including developed and unpaved areas of the water treatment NBRWTP, across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. For resource areas where environmental conditions vary between the alignments and could result in different impact outcomes, the analysis distinguishes between the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment, as appropriate.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-5 a. Would the project have a substantial effect on a scenic vista? Less Than Significant Impact. The primary NBRWTP facility is within an established utility and industrial setting characterized by existing water treatment infrastructure, including tanks, process buildings, pipelines, and associated facilities. The surrounding area consists primarily of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses, with public views of the site occurring primarily from local roadways, utility corridors, and nearby access routes. Viewer sensitivity in the vicinity of the treatment plant is considered low to moderate due to the industrial character of the setting and the limited presence of sensitive receptors or designated scenic viewing areas.
The Project also includes two alternative pipeline alignments connecting the NBRWTP to Vacaville’s existing distribution system. The Linear Trail Pipeline Alignment would generally follow the existing 30-inch transmission main adjacent to the Putah South Canal and former railroad corridor known as the Linear Trail. Public views along this alignment are characterized by existing roadway infrastructure, open space and undeveloped areas, utility corridors, and areas near drainage features such as Union Creek. Construction activities could result in temporary visual changes associated with equipment, staging, trenching, and traffic control measures; however, these impacts would be short term and would occur within an already developed roadway environment. Following construction, disturbed roadway and landscape areas would be restored, and the underground pipeline would not substantially alter the visual character of the area.
The Peabody Road Pipeline Alignment would generally be constructed within or adjacent to the existing Peabody Road corridor near developed and residential areas. Public views along this alignment are characterized primarily by existing roadway infrastructure, utility features, agricultural uses, and suburban residential development. Construction activities could result in temporary visual changes associated with equipment, staging, trenching, and traffic control measures; however, these impacts would be short term and would occur within an already developed roadway environment. Following construction, disturbed roadway and landscape areas would be restored, and the underground pipeline would not substantially alter the visual character of the area.
The existing NBRWTP and proposed pipeline alignments are not within or adjacent to a designated State Scenic Highway corridor, nor are they visible from recognized scenic corridors or protected public viewpoints identified in applicable local planning documents. Implementation of the Project would involve expansion and modification of existing utility infrastructure within developed facilities, utility corridors, and roadway rights-of-way. New aboveground facilities would be consistent in scale, massing, and visual character with existing infrastructure and would not introduce visually prominent features that would obstruct or substantially degrade public views.
Because the Project would not affect designated scenic resources or recognized scenic vistas and would remain visually compatible with surrounding land uses, impacts related to scenic vistas would be less than significant.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -6 b. Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? No Impact. The Project is not within or adjacent to a designated State Scenic Highway corridor.
Review of available mapping from Caltrans indicates that there are no officially designated or eligible State Scenic Highways in the immediate vicinity of the Project. The surrounding roadway network primarily serves industrial, utility, and local circulation functions rather than scenic or recreational travel.
Because the Project is not visible from a State Scenic Highway, scenic resources within such a corridor are not present within the Project area. In addition, the Project is within an established utility facility and associated infrastructure corridors that do not contain prominent natural scenic features such as significant rock outcroppings or mature tree stands that would qualify as protected scenic resources under this threshold.
With respect to cultural or historic resources, there are no known historic buildings or structures within or adjacent to a designated State Scenic Highway that would be affected by the Project.
Because the Project is not within a State Scenic Highway corridor, does not contain scenic resources associated with such corridors, and would not affect any qualifying scenic resources, implementation of the Project would not substantially damage scenic resources as defined under CEQA. There would be no impacts related to scenic resources within a State Scenic Highway. c. In non-urbanized areas, would the project substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from a publicly accessible vantage point.) If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less Than Significant Impact. California PRC Section 21071 defines an “urbanized area” as “(a) an incorporated city that meets either of the following criteria: (1) Has a population of at least 100,000 persons, or (2) Has a population of less than 100,000 persons if the population of that city and not more than two contiguous incorporated cities combined equals at least 100,000 persons.” The City of Fairfield has a total population of 119,881 persons. 7 Therefore, the Project site is within an urbanized area as defined by PRC Section 21071.
The Project would be required to comply with applicable City of Fairfield General Plan policies, zoning requirements, and Municipal Code standards related to site design, lighting, and visual quality. These standards include requirements for appropriate building materials, color treatments, and lighting controls to minimize visual contrast and light spillover. As a public utility facility, the Project is consistent with the land use designation and zoning applicable to the site, and no conflicts with scenic quality regulations would occur.
7 Bay Area Census. 2026. Fairfield. Website: https://census.bayareametro.gov/population?location=fairfield (accessed June 24, 2026).
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-7 The existing Project is characterized by an established water treatment facility with a utilitarian and industrial appearance, including tanks, process buildings, and associated infrastructure. Surrounding land uses consist of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses. Public views of the site are primarily limited to local roadways and service access routes, and viewer sensitivity is considered low to moderate due to the industrial context and limited presence of sensitive viewing receptors.
Implementation of the Project would involve expansion and modification of existing treatment facilities within the established NBRWTP site and along existing utility corridors. New structures and improvements would be similar in scale, massing, and function to existing infrastructure and would not introduce visually prominent or incompatible elements into the surrounding environment. The Project would not substantially alter the overall visual character of the site or its surroundings, as the proposed improvements would be consistent with the existing industrial and utility-oriented setting.
Although temporary visual changes would occur during construction (e.g., presence of equipment, staging areas, and ground disturbance), these effects would be short-term and would not substantially degrade public views of the site or surrounding area.
Because the Project would be visually consistent with the existing industrial setting, would not substantially degrade public views, and would comply with applicable plans and regulations governing visual quality, the Project would not result in a substantial adverse effect on visual character or quality. Impacts related to visual character and quality would be less than significant. d. Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less Than Significant Impact. The existing NBRWTP operates with standard utility-scale lighting designed for safety, security, and operational needs. Existing lighting includes mounted floodlights, wall-mounted fixtures, and process-area lighting, which produce moderate levels of ambient illumination typical of an industrial facility. The surrounding area is characterized by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses, and is not considered a low-light or dark-sky environment. Viewer sensitivity to light and glare is therefore considered low to moderate.
Implementation of the Project would include installation of new or upgraded lighting associated with expanded NBRWTP facilities and supporting infrastructure. However, all lighting would be designed and installed in accordance with applicable City General Plan policies and Municipal Code requirements, which require the use of fully shielded and downward-directed fixtures to minimize light trespass, glare, and skyglow. Lighting levels would be limited to those necessary for operational safety and security, and fixtures would be oriented and designed to reduce off-site light spillover.
In addition, the Project would not introduce high-intensity lighting sources such as stadium lighting or continuously illuminated commercial signage that could result in substantial increases in nighttime illumination. Daytime glare from new infrastructure (e.g., tanks, piping, or equipment)
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -8 would be similar in character to existing facility conditions and would not introduce highly reflective or visually intrusive materials beyond those already present on-site.
While some incremental increase in lighting may occur as a result of facility expansion, such increases would be consistent with the existing industrial context and would not substantially alter nighttime conditions or adversely affect public views or nearby receptors. Temporary lighting used during construction would be short-term and would be directed away from sensitive receptors to the extent feasible.
Because the Project would incorporate standard lighting controls, would be consistent with existing lighting conditions, and would not introduce substantial new sources of light or glare, impacts would not be significant. Impacts related to light and glare would be less than significant.
4.1.4 Mitigation Measures
No mitigation measures are warranted.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-9
4.2 AGRICULTURE AND FORESTRY RESOURCES
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the State’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment Project; and the forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board.
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b. Conflict with existing zoning for agricultural use, or a Williamson Act contract?
c. Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as
defined by Government Code Section 51104(g))?
d. Result in the loss of forest land or conversion of forest land to non-forest use?
e. Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
4.2.1 Baseline Conditions
4.2.1.1 Existing Farmland in the Area
The Project and immediate vicinity have mixed uses and include existing developed industrial-scale water treatment infrastructure and are surrounded by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses. The selected pipeline alignment would traverse a range of conditions, including developed and unpaved areas of the North Bay Regional Water Treatment Plant (NBRWTP), across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. The Project does not currently support agricultural activities, and no active farmland exists within the immediate vicinity of the proposed expansion area.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -10
4.2.1.2 Prime Agricultural Land
Based on the California Department of Conservation (DOC) Farmland Mapping and Monitoring Program (FMMP) 8
, the Project is not located on land designated as Prime Farmland, Farmland of Statewide Importance, or Unique Farmland. The area encompassing the treatment NBRWTP is designated as “Urban and Built-Up Land” and the surrounding area is similarly classified as “Urban and Built-Up Land,” with no significant concentrations of prime agricultural land in the immediate vicinity.
4.2.1.3 Williamson Act Contracts
The Project is not enrolled in a Williamson Act contract, nor is it located within an Agricultural Preserve under the California Land Conservation Act (Williamson Act). The surrounding area does not contain lands under Williamson Act contracts, as indicated by the Solano County Agricultural Preserves map. 9 Consequently, the proposed expansion area is not subject to the land use restrictions or tax benefits associated with the Williamson Act.
4.2.1.4 Forests and Forested Land
The Project and immediate vicinity are fully developed with industrial-scale water treatment infrastructure and are surrounded by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses. According to the California Department of Forestry and Fire Protection (CAL FIRE) Fire and Resource Assessment Program10, the site and surrounding lands are not designated as forest land, timberland, or woodlands. No stands of trees or forested areas exist, and there are no forest management or timber production activities in the area. Therefore, the Project does not currently support forest resources, and the proposed expansion would not result in the conversion of forest land. The baseline condition reflects a setting where forest land is absent, and no forest-related environmental constraints are present.
4.2.2 Regulatory Requirements
4.2.2.1 Federal Regulations
There are no federal policies or regulations related to agriculture and forestry resources that are applicable to the Project.
4.2.2.2 State Regulations
California Department of Conservation Farmland Mapping and Monitoring Program. Pursuant to Government Code Section 65570, the FMMP compiles consistent, timely, and accurate data to decision-makers for use in planning for the present and future of California’s agricultural land 8 California Department of Conservation (DOC). 2022. California Important Farmland Finder (map).
Website: maps.conservation.ca.gov/dlrp/ciff/ (accessed May 5, 2026). 9 County of Solano. 2026. Agricultural Preserves/Williamson Act Contracts. Website:
https://www.solanocounty.gov/government/resource-management/planning-services/development-programs/agricultural-preserveswilliamson-act-contracts (accessed May 5, 2026). 10 California Department of Forestry and Fire Protection (CAL FIRE). 2026a. Fire and Resource Assessment Program. Website: https://www.fire.ca.gov/what-we-do/fire-resource-assessment-program (accessed May 5, 2026).
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-11 resources. The FMMP provides maps and statistical data to the public, academia, and local, State, and federal governments on the nature, location, and extent of farmland, grazing land, and urban built-up areas in the State to assist in making informed decisions for the best utilization of California’s farmland. Government Code Section 65570 mandates the FMMP to biennially report to the Legislature on the conversion of farmland and grazing land and to provide maps and data to local governments and the public. The FMMP also prepares and maintains an automated map and database system to record and report changes in the use of agricultural lands. These maps combine soil survey and current land use information from the United States Department of Agriculture and Natural Resources Conservation Service to provide an inventory of agricultural resources in each county. The maps show urbanized lands and a qualitative sequence of agricultural designations.
Pursuant to the FMMP, all lands within California are classified into one of seven map categories.
The minimum mapping unit is 10 acres, except as otherwise noted. 11 Provided below is a description of the various map categories established by the FMMP, assessing the importance of agricultural land based on factors such as soil characteristics, climate, and water supply:
• Prime Farmland: The best combination of physical and chemical features and able to sustain long-term agricultural production. This land has the soil quality, growing season, and moisture supply needed to produce sustained high yields. Land must have been used for irrigated agricultural production at some time during the 4 years prior to the mapping date. • Farmland of Statewide Importance: Similar to Prime Farmland but with minor shortcomings, such as steeper slopes or less ability to store soil moisture. Land must have been used for irrigated agricultural production at some time during the 4 years prior to the mapping date. • Unique Farmland: Lesser-quality soils used for the production of the State’s leading agricultural crops. This land is usually irrigated but may include unirrigated orchards or vineyards. Land must have been cultivated at some time during the 4 years prior to the mapping date. • Farmland of Local Importance: Land of importance to the local economy, as defined by each county’s local advisory committee and adopted by its board of supervisors. This refers to all farmable lands in the county that do not meet the definitions of Prime, Statewide, or Unique.
This includes land that is or has been used for irrigated pasture, dryland farming, confined livestock and dairy, poultry facilities, aquaculture, and grazing land. • Grazing Land: This type of land is occupied with vegetation suited to grazing livestock. This category was developed in cooperation with the California Cattlemen’s Association, the University of California Cooperative Extension, and other groups interested in the extent of grazing activities. The minimum mapping unit is 40 acres. 11 DOC. 2004. A Guide to the Farmland Mapping and Monitoring Program. 2004. p. 6.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -12 • Urban and Built‐Up Land: This type of land is occupied by structures with a building density of at least one unit to 1.5 acres, or approximately six structures to a 10-acre parcel. Common examples of land uses include residential, industrial, commercial, and institutional facilities; public administrative purposes; railroad and transportation yards; cemeteries; airports; golf courses; sanitary landfills; sewage treatment; water control structures; and other developed purposes.
• Other Land: This type of land is not included in any other mapping category. Common examples include low‐density rural developments; brush, timber wetland, and riparian area not suitable for livestock grazing; confined livestock, poultry, or aquaculture facilities; strip mines; and waterbodies smaller than 40 acres. Vacant and nonagricultural land surrounded on all sides by urban development that is greater than 40 acres is mapped as Other Land.
4.2.2.3 Regional/Local
There are no regional/local policies or regulations related to agriculture and forestry resources that are applicable to the Project.
4.2.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered including the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way on land that is not used for agricultural uses or forestland. Therefore, both alignments are presumed to have similar impacts to agriculture and forestry resources and are analyzed together in this section. a. Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland) as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. The Project is designated as “Urban and Built-Up Land” by the FMMP and is occupied by an existing water treatment facility and associated infrastructure. Both proposed pipeline alignments are also in areas designated as “Urban and Built-Up Land” and “Grazing Land.” The FMMP classification indicates that the site does not meet the criteria for Prime Farmland, Farmland of Statewide Importance, or Unique Farmland, and is not currently used for agricultural production.
Surrounding areas include lands designated as “Grazing Land,” but no designated Prime, Unique, or Statewide Important Farmland occurs within the Project footprint or immediate vicinity.
The Project would involve expansion and modification of the existing NBRWTP and construction of a transmission pipeline within established utility corridors, primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way. The pipeline alignment would be installed underground, with temporary construction disturbance and restoration of surface conditions following installation. Therefore, the Project would not introduce new development into undeveloped agricultural lands or result in the permanent conversion of farmland resources.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-13 Because the Project is already developed and not classified as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance, and because the pipeline would be constructed within existing corridors with no permanent conversion of agricultural land, the Project would not result in the conversion of designated farmland to non-agricultural use.
In addition, the Project is consistent with the intent of the Farmland Protection Policy Act (7 United States Code 4201 et seq.), which seeks to minimize the conversion of farmland to non-agricultural uses, as no such farmland resources would be affected. The Project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to non-agricultural use, and there would be no impacts.
b. Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. The California Department of Conservation’s Farmland Mapping and Monitoring Program designates the Project site as “Urban and Built-Up Land.” It is currently developed with an existing water treatment facility and associated infrastructure. Both proposed pipeline alignments are also in areas designated as “Urban and Built-Up Land” and “Grazing Land.” The Project is not zoned for agricultural use and does not support active agricultural operations.
Additionally, the Project is not enrolled in a Williamson Act contract and is not within an agricultural preserve. The surrounding area similarly does not contain lands under Williamson Act contracts.
Therefore, the Project would not result in the cancellation, non-renewal, or conflict with any Williamson Act contract or agricultural preserve requirements.
The Project involves expansion of an existing public utility facility and construction of an underground transmission pipeline within and adjacent to existing utility corridors and rights-of-way. These activities would be within areas designated and planned for infrastructure and urban uses and would not introduce non-agricultural uses into agriculturally zoned lands.
Because the Project is not zoned for agricultural use, is not under a Williamson Act contract, and would not affect nearby agricultural preserves or zoning designations, implementation of the Project would not conflict with existing agricultural zoning or Williamson Act provisions. No agricultural zoning designations or Williamson Act contracts would be modified, cancelled, or otherwise affected by Project implementation and there would be no impacts. c. Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?
No Impact. The Project and surrounding area are fully developed and characterized by an existing water treatment facility and associated infrastructure, with adjacent land uses consisting of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses. The site and surrounding lands are not designated as forest land, timberland, or Timberland Production Zones (TPZ) by the CAL FIRE or local jurisdictional zoning maps.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -14 The Project involves expansion of an existing utility facility and installation of a transmission pipeline within and adjacent to established corridors and previously disturbed areas. The Project does not include rezoning actions and would not alter existing land use designations applicable to the site or surrounding area.
Because no forest land, timberland, or TPZ-designated lands are within or adjacent to the Project, and because the Project would not require or result in any rezoning of such lands, implementation of the Project would not conflict with applicable forest or timberland zoning provisions. The Project would not conflict with existing zoning for forest land, timberland, or timberland zoned Timberland Production, nor would it cause rezoning of such lands. Because no such resources or zoning designations are present within or adjacent to the Project, no impact would occur. d. Would the project result in the loss of forest land or conversion of forestland to non-forest use? No Impact. The Project and surrounding area are fully developed and do not contain forest land, timberland, or woodland resources. The site consists of an existing water treatment facility and associated infrastructure, and surrounding land uses include vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses. According to the CAL FIRE, the Project area is not designated as forest land and does not support forest resources or timber production activities.
The Project involves expansion of an existing facility and installation of a transmission pipeline within and adjacent to previously disturbed areas, existing roadways, and utility corridors. The Project would not require removal of forested areas or conversion of land supporting forest resources.
Because no forest land exists within or adjacent to the Project, and no such resources would be affected by Project implementation, there is no mechanism by which the Project could result in the loss or conversion of forest land. The Project would not result in the loss of forest land or conversion of forest land to non-forest use. No impact would occur. e. Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No Impact. As discussed above, the Project and surrounding area are primarily fully developed and do not contain agricultural land, forest land, timberland, or woodland resources or areas zoned for these uses. The site consists of an existing water treatment facility and associated infrastructure, and surrounding land uses include open space, residential, and commercial/industrial development.
The Project would not result in the conversion of farmland to non-agricultural uses or forest land to non-forest uses nor would the Project result in other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use. No impact would occur.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-15
4.2.4 Mitigation Measures
No mitigation measures are warranted.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -16
4.3 AIR QUALITY
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations.
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Conflict with or obstruct implementation of the applicable air quality plan?
b. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard?
c. Expose sensitive receptors to substantial pollutant
concentrations?
d. Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
4.3.1 Baseline Conditions
4.3.1.1 Air Quality Conditions
The Project area is within the San Francisco Bay Area Air Basin (Air Basin), a large, shallow air basin ringed by hills that taper into a number of sheltered valleys around the perimeter. The Project area experiences a Mediterranean climate characterized by warm, dry summers and mild, wet winters.
Air quality conditions in the Project vicinity are influenced by marine air flowing inland through the Carquinez Strait and the Sacramento-San Joaquin River Delta, which generally promotes pollutant dispersion. However, regional ozone and particulate matter concentrations can periodically increase during stagnant weather conditions and wildfire events.
The Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for criteria pollutants, including ozone (O₃), carbon monoxide (CO), nitrogen dioxide (NO₂), sulfur dioxide (SO₂), particulate matter less than 10 microns in diameter (PM₁₀), particulate matter less than 2.5 microns in diameter (PM₂.₅), and lead. The Air Basin is currently designated as a nonattainment area for State and federal ozone standards, State PM₁₀ standards, and the federal standard for 24-hour PM₂.₅. 12 Other criteria pollutants are generally
within applicable federal and State standards.
Primary sources of air pollutant emissions in Solano County include motor vehicles, industrial activities, construction equipment, area-wide consumer products (such as paints, varnishes, sealants, solvents, aerosols pesticide and herbicides, etc.), agricultural activities, and energy use. 12 Bay Area Air District. Air Quality Standards and Attainment Status. Website: https://www.baaqmd.gov/ about-air-quality/research-and-data/air-quality-standards-and-attainment-status (accessed September 2026).
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-17 Wildfire smoke has also become an increasingly important contributor to episodic particulate matter concentrations throughout the region.
4.3.1.2 Project Vicinity
The North Bay Regional Water Treatment Plant (NBRWTP) is within a developed utility facility surrounded by a mix of public utility infrastructure, open space, agricultural lands, transportation corridors, and scattered residential development. Existing emission sources in the vicinity include vehicle traffic on Interstate 80, Peabody Road, and local roadways; agricultural operations; utility and maintenance activities; and regional industrial and commercial sources.
The Linear Trail Pipeline Alignment traverses primarily open space, utility corridors, drainage features, and areas adjacent to the Putah South Canal and former railroad corridor. Air quality conditions along this alignment are influenced primarily by regional background pollutant concentrations, agricultural activities, maintenance operations, and vehicle traffic on nearby roadways.
The Peabody Road Pipeline Alignment is primarily within or adjacent to the Peabody Road corridor, where existing air quality conditions are influenced by local traffic, nearby residential and commercial development, agricultural activities, and regional transportation sources. Portions of the alignment are closer to existing sensitive receptors, including residences and recreational users, than the Linear Trail Pipeline Alignment.
4.3.1.3 Sensitive Receptors
Sensitive receptors are land uses that are more susceptible to adverse effects from exposure to air pollutants and include residences, schools, daycare centers, parks, hospitals, and senior care facilities. Sensitive receptors located nearest to the Project include residential neighborhoods along portions of the Peabody Road corridor and scattered rural residences within Fairfield and Vacaville.
The NBRWTP itself is not considered a sensitive receptor. The nearest sensitive receptor to construction activities at the existing NBRWTP would be the single-family residences approximately 540 feet west of the center of construction activities. The nearest sensitive receptor to construction activities along the pipeline alternatives would be the single-family residences approximately 50 feet west of the centerline of the proposed Peabody Road pipeline alignment. Vanden High School is the closest school to the NBRWTP and is approximately 1.05 miles to the south.
4.3.1.4 Thresholds of Significance
The NBRWTP and a majority of the Project is within the Bay Area Air District (Air District). In addition, the CEQA lead agency, the City of Fairfield, is within the Air District. It is noted that the northernmost portion of the proposed pipeline alignment extends into the jurisdiction of the Yolo-Solano Air Quality Management District. However, the majority of emissions that would be emitted as a result of the Project would occur within the Air District boundaries. In addition, Yolo-Solano Air
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -18 Quality Management District threshold are generally similar to the Air District thresholds. 13 As a result, Project emissions are compared to the Air District thresholds of significance.
According to the Air District’s California Environmental Quality Act (CEQA) Guidelines, to meet air quality standards for criteria air pollutant and air precursor impacts, a proposed project must not:
• Contribute to carbon monoxide (CO) concentrations exceeding the State ambient air quality standards;
• Generate average daily construction emissions of reactive organic gases (ROG), nitrogen oxides (NOX), or PM2.5 (exhaust) greater than 54 pounds per day or particulate matter less than 10 microns in size (PM10) exhaust emissions greater than 82 pounds per day; • Generate operational emissions of ROG, NOX or PM2.5 of greater than 10 tons per year or 54 pounds per day, or PM10 emissions greater than 15 tons per year or 82 pounds per day; or • Result in an increased cancer risk greater than 10.0 in 1 million; increased non-cancer hazard risk index (chronic or acute) greater than 1.0; or increased PM2.5 concentrations greater than
0.3 microgram per cubic meter (µg/m3
) annual average.
4.3.2 Regulatory Requirements
4.3.2.1 Federal Regulations
Federal Clean Air Act (CAA). The 1970 federal CAA authorized establishment of national health-based air quality standards (NAAQS) and set deadline for their attainment. The CAA Amendments of 1990 changed deadline for attaining national standards as well as the remedial actions required for area of the nation that exceed the standards. Under the CAA, State and local agencies in area that exceed the national standards are required to develop State Implementation Plans to demonstrate how they will achieve the national standards by specified dates. The EPA enforces the CAA and regulates transportation-related emissions. The vehicular emission standards set by the EPA apply to vehicles sold in states other that California. Automobiles sold in California must meet stricter emission standards set by the CARB.
4.3.2.2 State Regulations
California Clean Air Act (CCAA). In 1988, the CCAA required that all air districts in the State endeavor to achieve and maintain California Ambient Air Quality Standards (CAAQS) for CO, O3, SO2, and NO2 by the earliest practical date. The CCAA provides districts with authority to regulate indirect sources and mandates that air quality districts focus particular attention on reducing emissions from transportation and area-wide emission sources. Each nonattainment district is required to adopt a plan to achieve a 5 percent annual reduction, averaged over consecutive 3-year periods, in district-wide emissions of each nonattainment pollutant or its precursors. A Clean Air Plan shows how a 13 For PM10, the Yolo-Solano Air Quality Management District has adopted a more stringent threshold of significance of 80 lbs/day compared to the Air District threshold of 82 lbs/day. All other thresholds are similar or less stringent.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-19 district would reduce emissions to achieve air quality standards. Generally, the State standards for these pollutants are more stringent than the national standards.
California Air Resources Board (CARB). CARB is the State’s “clean air agency” responsible for implementing the CCAA. CARB’s goals are to attain and maintain healthy air quality, protect the public from exposure to toxic air contaminants (TACs), and oversee compliance with air pollution rules and regulations. TACs are a broad set of air pollutants that may lead to serious illness or increased mortality, even when present in relatively low concentrations. TACs are often referred to as “non-criteria” air contaminants because ambient air quality standards have not been established for them. Hundreds of different types of TACs exist, with varying degrees of toxicity. Many TACs are confirmed or suspected carcinogens, or are known or suspected to cause birth defects or neurological damage. For some chemicals, such as carcinogens, no thresholds exist below which exposure can be considered risk-free. Examples of TAC sources in the Project include fossil fuel combustion.
4.3.2.3 Regional/Local
Bay Area Air District. The Air District seeks to attain and maintain air quality conditions in the Air Basin through a comprehensive program of planning, regulation, enforcement, technical innovation, and education. The clean air strategy includes the preparation of plans for the attainment of AAQS, adoption and enforcement of rules and regulations, and issuance of permits for stationary sources.
The Air District also inspects stationary sources and responds to citizen complaints, monitors ambient air quality and meteorological conditions, and implements programs and regulations required by law. The Air District 2017 Clean Air Plan (Clean Air Plan), which was adopted on April 19, 2017, by the Air District Board of Directors, is the current Clean Air Plan and contains district-wide control measures to reduce O3 precursor emissions (e.g., ROG and NOx), particulate matter, and greenhouse gas (GHG) emissions. The Clean Air Plan guides the region’s air quality planning efforts to attain the CAAQS. 14
City of Fairfield General Plan. The Environmental Justice and Public Health Element of the City of Fairfield’s General Plan15 includes goals and policies related to air quality and pollution. The following policies may be applicable to the Project:
• Goal EJPH-1. Reduce air, land, and water pollution, mitigate the impacts of pollution on existing sensitive land uses, and alleviate associated health disparities. ○ Policy EJPH-1.1. Sensitive Receptors. Protect sensitive receptors such as schools, childcare centers, senior living facilities, and residences from the impacts of stationary and non-stationary sources of pollution by ensuring adequate buffers or mitigation measures.
Establish vegetative barriers or green wall barriers between industrial land and sensitive 14 Bay Area Air District. 2017. Final 2017 Clean Air Plan. April 19. Website: www.baaqmd.gov/~/media/files/ planning-and-research/plans/2017-clean-air-plan/attachment-a_-proposed-final-cap-vol-1-pdf.pdf?la=en (accessed June 2026). 15 City of Fairfield. 2024d. General Plan Documents. December. Website: https://www.fairfield.ca.gov/ government/city-departments/community-development/planning-division/general-plan/general-plan-documents (accessed June 2026).
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -20 land uses, and along heavy-duty truck/goods movement corridors and freeways to protect sensitive land uses from pollution impacts.
○ Policy EJPH-1.2. Impact Assessment and Mitigation. Continue to use the Bay Area Air Quality and Monitoring District modeling tools and guidance documents, as appropriate, to identify and mitigate air quality impacts from proposed development projects, including projects within 500 feet of a major freeway.
City of Vacaville General Plan. The Conservation and Open Space Element of the City of Vacaville General Plan includes goals and policies that relate to air quality. The following policies may be applicable to the Project: 16
• Goal COS-12. Maintain and improve air quality.
○ Policy COS-P12.3. Encourage project designs that protect and improve air quality and minimize direct and indirect air pollutant emissions by including components that reduce vehicle trips and promote energy efficiency.
○ Policy COS-P12.4. Require that development projects implement best management practices to reduce air pollutant emissions associated with the construction and operation of the project.
○ Policy COS-P12.5. Require dust control measures as a condition of approval for subdivision maps, site plans, and all grading permits.
4.3.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. Although the Peabody Road Pipeline Alignment is approximately 400 feet (about 4 percent) longer than the Linear Trail Pipeline Alignment, the difference in pipeline length and associated construction activities is minor relative to the overall scope of the Project, including the construction of the NBRWTP improvements. Both alignments would require similar construction methods, including trench excavation, pipe installation, surface restoration, construction equipment operation, material hauling, and worker travel, and would be constructed over comparable durations. Likewise, operational emissions associated with either alignment would be substantially the same because both would convey the same volume of treated water and require similar long-term operation and maintenance activities. Accordingly, the air quality analysis is representative of either pipeline alignment, and any differences in construction-related emissions between the two alignments would be negligible and would not affect the conclusions of this analysis. 16 City of Vacaville. 2015. Vacaville General Plan. Website: https://www.cityofvacaville.gov/home/ showpublisheddocument/14102/637045896849400000 (accessed June 2026).
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-21 a. Would the project conflict with or obstruct implementation of the applicable air quality plan? Less Than Significant Impact. The applicable air quality plan is the Air District’s 2017 Clean Air Plan, which defines control strategies to reduce emissions and ambient concentrations of air pollutants; safeguard public health by reducing exposure to air pollutants that pose the greatest health risk, with an emphasis on protecting the communities most heavily affected by air pollution; and reduce GHG emissions to protect the climate. Consistency with the Clean Air Plan can be determined if the project (1) supports the goals of the Clean Air Plan, (2) includes applicable control measures from the Clean Air Plan, and (3) would not disrupt or hinder implementation of any control measures from the Clean Air Plan.
Clean Air Plan Goals. The primary goals of the Clean Air Plan are to attain air quality standards, reduce population exposure and protect public health in the Bay Area, and reduce GHG emissions and protect the climate.
The Air District has established significance thresholds for project construction and operational impacts at a level at which the cumulative impact of exceeding these thresholds would have an adverse impact on the region’s attainment of air quality standards. The health and hazards thresholds were established to help protect public health. As discussed below, construction and operation of the Project would not result in the generation of criteria air pollutants that would exceed the Air District’s thresholds of significance. Therefore, the Project would not conflict with the Clean Air Plan goals.
Clean Air Plan Control Measures. The control strategies of the Clean Air Plan include measures in the following categories: Stationary Source Measures, Transportation Measures, Energy Measures, Building Measures, Agriculture Measures, Natural and Working Lands Measures, Waste Management Measures, Water Measures, and Super-GHG Pollutants Measures. The Project’s compliance with each of these control measures is discussed below.
Stationary-Source Control Measures. The Stationary Source Control Measures are intended to reduce emissions from major stationary sources such as metal melting facilities, cement kilns, refineries, glass furnaces, and other industrial operations. The Project would not introduce any of these types of emission sources. Although the Project would include upgrades and expansion of existing water treatment plant facilities to increase treatment capacity and meet future operational needs, the Project would not involve the types of major industrial stationary sources targeted by these control measures. Implementation of the Project would require installation of new electric-powered pumps, which do not result in stationary emissions. In addition, the Project is expected to include one or more diesel-fueled emergency generators to support the BESS, as well as new ozone generators for water treatment upgrades. These pieces of equipment would result in stationary-source emissions. However, any future stationary equipment would be subject to the Air District’s permitting requirements, including Regulation 2, Rule 1 (Permits—General Requirements) and Regulation 2, Rule 2 (Permits—New Source Review). These regulations require review of new and modified stationary sources prior to construction and implementation of applicable emission control requirements. Accordingly, the Project would not conflict with or obstruct implementation of the Stationary Source Control Measures.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -22 Transportation Control Measures. The Air District identifies Transportation Control Measures as part of the Clean Air Plan to decrease emissions of criteria pollutants, TACs, and GHGs by reducing demand for motor vehicle travel, promoting efficient vehicles and transit service, decarbonizing transportation fuels, and electrifying motor vehicles and equipment. The Project is an infrastructure improvement and expansion project intended to increase treatment capacity and reliability at an existing water treatment facility and is not a transportation project that would alter the regional transportation network, affect transit service, or influence travel demand patterns. Operation of the expanded facility would result in a limited increase in vehicle trips associated with routine facility operations, including employee commutes, operations and maintenance staff activities, equipment inspections, preventative maintenance, service vehicles, and delivery of supplies and treatment chemicals. Although these activities would generate additional vehicle trips, the increase would be limited and would primarily consist of periodic service and delivery trips necessary to support operation of the facility. Because the Project would not induce substantial new travel demand, alter transportation infrastructure, or conflict with strategies intended to reduce regional vehicle emissions, it would not interfere with implementation of the Transportation Control Measures
Energy Control Measures. The Clean Air Plan also includes Energy Control Measures, which are designed to reduce emissions of criteria air pollutants, TACs, and GHGs by decreasing the amount of electricity consumed in the Bay Area, as well as decreasing the carbon intensity of the electricity used by switching to less GHG-intensive fuel sources for electricity generation.
Because these measures apply to electrical utility providers and local government agencies (and not individual projects), the Energy Control Measures of the Clean Air Plan are not applicable to the Project. Nonetheless, the Project would include modernization and replacement of water treatment infrastructure and equipment, which would improve the operational efficiency of the facility and support the overall intent of the Energy Control Measures by reducing energy demand associated with water treatment operations.
Building Control Measures. The Air District has authority to regulate emissions from certain sources in buildings (e.g., boilers and water heaters) but has limited authority to regulate buildings themselves. Therefore, the strategies in the control measures for this sector focus on working with local governments that do have authority over local building codes to facilitate adoption of best GHG control practices and policies. The Project consists of upgrades and expansion of an existing water treatment facility and is not primarily a building development Project. Nevertheless, building improvements constructed as part of the Project would be required to comply with applicable provisions of the California Building Standards Code, including Title 24 energy efficiency requirements and applicable green building standards. In addition, the Project would incorporate modernized treatment equipment and infrastructure designed to improve operational efficiency and reliability. Therefore, the Project would not conflict with implementation of the Building Control Measures identified in the Clean Air Plan.
Agriculture Control Measures. The Agriculture Control Measures are designed to primarily reduce emissions of methane (CH4). Because the Project does not include any agricultural activities, the Agriculture Control Measures of the Clean Air Plan are not applicable to the Project.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-23 Natural and Working Lands Control Measures. The Natural and Working Lands Control Measures focus on increasing carbon sequestration on rangelands and wetlands, as well as encouraging local governments to adopt ordinances that promote urban tree plantings. Because the Project would not result in permanent effects to rangelands or wetlands, the Natural and Working Lands Control Measures of the Clean Air Plan are not applicable to the Project.
Waste Management Control Measures. The Waste Management Control Measures focus on reducing or capturing CH4 emissions from landfills and composting facilities, diverting organic materials away from landfills, and increasing waste diversion rates through efforts to reduce, reuse, and recycle. The Project would comply with local requirements for waste management (e.g., recycling and composting services). Therefore, the Project would be consistent with the Waste Management Control Measures of the Clean Air Plan.
Water Control Measures. The Water Control Measures focus on reducing emissions of criteria pollutants, TACs, and GHGs by encouraging water conservation, limiting GHG emissions from publicly owned treatment works, and promoting the use of biogas recovery systems. Although many of these measures are directed toward water and wastewater utilities and local government agencies rather than individual projects, the Project would expand and modernize an existing water treatment facility to improve treatment capacity, operational reliability, and system efficiency. The Project would not interfere with implementation of any Water Control Measures and may support the overall intent of these measures through the replacement and modernization of aging infrastructure and installation of more efficient treatment equipment.
Therefore, the Project would not conflict with the Water Control Measures identified in the Clean Air Plan.
Super-GHG Control Measures. The Super-GHG Control Measures are designed to facilitate the adoption of best GHG control practices and policies through the Air District and local government agencies. Because these measures do not apply to individual projects, the Super-GHG Control Measures are not applicable to the Project.
Clean Air Plan Implementation. As discussed above, the Project would generally implement the applicable measures outlined in the Clean Air Plan. The Project is an infrastructure project that supports regional growth planned in the General Plan. As described further below, implementation of the Project would result in no substantial increase in permanent operational emissions. Emissions that occur during construction activities are temporary and would cease upon completion of the construction period. The Air District thresholds of significance were adopted to work towards regional attainment of the AAQS. Both short-term construction and long-term operational emissions would be well below the applicable thresholds of significance, which further supports Project consistency with the Clean Air Plan. Therefore, the Project would not disrupt or hinder implementation of a control measure from the Clean Air Plan.
In conclusion, the Project is determined to be consistent with the Clean Air Plan because it supports the goals of the Clean Air Plan, is consistent with applicable control measures from the Clean Air Plan, and would not disrupt or hinder implementation of any control measures from the Clean Air Plan. Impacts would be less than significant.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -24 b. Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard?
Less Than Significant Impact. The Air Basin is currently designated as a nonattainment area for State and federal O3 standards, the State PM10 standard, and federal nonattainment for PM2.5. The Air District’s nonattainment status is attributed to the region’s development history. Past, present, and future development projects contribute to the region’s adverse air quality impacts on a cumulative basis. By its very nature, air pollution is largely a cumulative impact. No single project is sufficient in size to, by itself, result in nonattainment of AAQS. Instead, a project’s individual emissions contribute to existing cumulatively significant adverse air quality impacts. If a project’s contribution to the cumulative impact is considerable, then the project’s impact on air quality would be considered significant.
The California Emissions Estimator Model (CalEEMod), Version 2022.1, computer program was used to calculate air quality and GHG emissions from on-site construction equipment and emissions from worker and vehicle trips to the site. The operational analysis quantifies the emissions associated with new changes proposed under the Project. See Appendix A for details regarding the emission modeling parameters and assumptions.
Calculated emissions were then compared to the Air District’s thresholds of significance. In developing thresholds of significance for air pollutants, the Air District considered the emission levels for which a project’s individual emissions would be cumulatively considerable. If a project exceeds the identified significance thresholds, its emissions would be cumulatively considerable, resulting in significant adverse air quality impacts to the region’s existing air quality conditions.
Therefore, additional analysis to assess cumulative impacts is unnecessary. The following analysis assesses the potential project-level construction- and operation-related air quality impacts.
Construction Emissions. During construction, short-term degradation of air quality may occur due to the release of particulate emissions generated by demolition, grading, paving, and other activities.
Emissions from construction equipment are also anticipated and would include CO, NOX, ROG, directly emitted particulate matter (PM2.5 and PM10), and TACs such as diesel exhaust particulate matter.
Table 4.3.A presents the Project’s average daily construction emissions for each construction year compared to the Air District thresholds.
As shown in the table, construction of the Project would not exceed the applicable Air District thresholds for ROG, NOX), PM10, and exhaust PM2.5. It is noted that total PM10 emission also would not exceed the Yolo-Solano Air Quality Management District’s threshold of 80 lbs/day. In addition to the construction emissions thresholds, the Air District requires implementation of its Basic Construction Best Management Practices (BMPs) to minimize fugitive dust emissions during construction and to conclude that a less than significant impact related to particulate matter would occur. As noted in the Project Description, the project has committed to implementing these control measures as a Project Design Feature. Compliance with these existing regulatory requirements, including
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-25 Table 4.3.A: Project Construction Emissions
Construction Year
Criteria Pollutant Emissions (average pounds per day)
ROG NOX
Exhaust
PM10
Fugitive Dust
PM10
Exhaust
PM2.5
Fugitive Dust
PM2.5
2028 3.1 27.1 1.1 2.0 1.0 0.9
2029 3.2 16.6 0.6 1.1 0.6 0.2
2030 3.1 9.3 0.3 0.4 0.3 0.1
2031 2.0 16.6 0.5 0.2 0.5 0.1
2022 0.8 4.5 0.1 0.1 0.1 0.0
Air District Thresholds 54.0 54.0 82.0 BMP 54.0 BMP
Exceed Threshold? No No No N/A No N/A
Source: Compiled by LSA (September 2026).
Note: Consistent with Air District thresholds, project construction emissions presented above are average daily emissions for each construction year.
BMP = best management practices
N/A = not applicable
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gases
implementation of the Air District’s Basic Construction BMPs, would minimize construction-related fugitive dust emissions. Therefore, with implementation of BMPs during construction, the Project would not result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is in nonattainment under an applicable federal or State ambient air quality standards.
Operational Emissions. Long-term air pollutant emissions associated with the Project would primarily include mobile-source emissions from additional staff trips and material deliveries, as well as stationary-source emissions associated with the two modeled diesel-fueled backup generators.
While detailed specifications about the proposed back-up generators are not available at this time, the generators were conservatively assumed to be 1,800 horsepower and to operate for 50 hours per year. Actual allowable operating hours will be established during the permitting process with the Air District.
Emissions from the ozone generation system were not explicitly modeled because the system would be equipped with an ozone destruct unit that would treat residual ozone in the process off-gas prior to its release to the atmosphere. The ozone destruct unit would operate as a passive process wherein off-gas from the ozone treatment process would be routed through catalytic media that converts residual ozone (O₃) into oxygen (O₂). The ozone destruct unit would not involve an internal combustion engine and therefore would not generate combustion-related criteria pollutant emissions. The treated off-gas would consist primarily of the oxygen resulting from ozone decomposition. Accordingly, operation of the ozone generation and ozone destruct system is expected to result in negligible ozone emissions and no other substantive criteria pollutant emissions.
The daily and annual emissions associated with Project operational trip generation, energy, stationary, and area sources are identified in Table 4.3.B for ROG, NOX, PM10, and PM2.5.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -26 Table 4.3.B: Project Operational Emissions
Emissions Source ROG NOX PM10 PM2.5
Average Pounds per Day
Mobile Source 0.1 0.2 <0.1 <0.1
Area Source 0.3 <0.1 0.0 0.0
Energy Source <0.1 0.1 <0.1 <0.1
Off-Road 0.0 0.0 0.0 0.0
Stationary Source 0.8 3.6 <0.1 <0.1
Total Emissions 1.2 3.9 0.1 0.1
Air District Thresholds 54.0 54.0 82.0 54.0
Exceed Threshold? No No No No
Tons per Year
Mobile Source <0.1 <0.1 <0.1 <0.1
Area Source 0.1 <0.1 0.0 0.0
Energy Source <0.1 <0.1 <0.1 <0.1
Off-Road 0.0 0.0 0.0 0.0
Stationary Source 0.1 0.7 <0.1 <0.1
Total Emissions 0.2 0.7 0.1 <0.1
Air District Thresholds 10.0 10.0 15.0 10.0
Exceed Threshold? No No No No
Source: Compiled by LSA (September 2026).
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gases
The results shown in Table 4.3.B indicate the Project would not exceed the significance criteria for daily or annual ROG, NOX, PM10, and PM2.5 emissions; therefore, operation of the Project would not result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is in nonattainment under an applicable federal or State AAQS.
Localized CO Impacts. Emissions and ambient concentrations of CO have decreased dramatically in the Bay Area with the introduction of the catalytic converter in 1975. No exceedances of the State or federal CO standards have been recorded at Bay Area monitoring stations since 1991. The Air District’s CEQA Guidelines include recommended methodologies for quantifying concentrations of localized CO levels for proposed transportation projects. A screening-level analysis using guidance from the Air District’s CEQA Guidelines was performed to determine the impacts of the Project. The screening methodology provides a conservative indication of whether the implementation of a Project would result in significant CO emissions. According to the Air District’s CEQA Guidelines, a Project would result in a less than significant impact related to localized CO concentrations if the following screening criteria are met:
• The project is consistent with an applicable congestion management program established by the county congestion management agency for designated roads or highways, and with the regional transportation plan and local congestion management agency plans. • Project traffic would not increase traffic volumes at affected intersections to more than 44,000 vehicles per hour.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-27 • The project would not increase traffic volumes at affected intersections to more than 24,000 vehicles per hour where vertical and/or horizontal mixing is substantially limited (e.g., tunnel, parking garage, bridge underpass, natural or urban street canyon, or below-grade roadway).
Given the minor expected increase in vehicle trips required to support the Project, the addition of Project traffic would not result in peak-hour traffic volumes at intersections in the vicinity of the Project site in excess of 44,000 vehicles per hour. In addition, the Project site is not located in an area where vertical or horizontal mixing is substantially limited. Therefore, the Project would not result in localized CO concentrations that exceed State or federal standards.
Based on the analysis presented above, implementation of the Project would not result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is non-attainment under an applicable federal or state ambient air quality standard, and the impact would be less than significant.
c. Would the project expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impact. Sensitive receptors are land uses where occupants are more susceptible to adverse effects from air pollution, including residences, schools, daycare centers, hospitals, nursing homes, parks, and similar facilities. Sensitive receptors in the vicinity of the Project disturbance area include residential neighborhoods and scattered rural residences along portions of the pipeline corridors and within surrounding Fairfield and Vacaville neighborhoods. The nearest sensitive receptor to construction activities at the existing NBRWTP would be the single-family residences approximately 540 feet west of the center of construction activities. The nearest sensitive receptor to construction activities along the pipeline alternatives would be the single-family residences approximately 50 feet west of the centerline of the proposed Peabody Road pipeline alignment.
Construction of the NBRWTP improvements and either pipeline alignment would result in temporary emissions of criteria air pollutants, fugitive dust, diesel particulate matter (DPM), and other exhaust emissions from heavy-duty construction equipment, haul trucks, worker vehicles, and construction activities. Should the Peabody Road Pipeline Alignment be selected, the greatest potential for exposure would occur during active construction periods adjacent to nearby residences, where construction activities would be closer to existing residential development. The Linear Trail Pipeline Alignment traverses predominantly open space, utility corridors, and undeveloped areas and generally maintains greater separation from sensitive receptors.
As shown in Table 4.3.A, construction emissions would be well below applicable Air District significance thresholds. In addition, construction activities would be temporary, would move progressively along the pipeline alignments, and would not result in long-term exposure of nearby receptors to elevated pollutant concentrations. Active diesel-powered construction equipment would be located near any individual receptor only temporarily as trenching, pipeline installation, backfilling, and surface restoration progress along the corridor. Fugitive dust emissions would be controlled through implementation of the Air District’s Basic best management practices, including watering exposed soils, covering haul trucks, limiting track-out, and stabilizing disturbed surfaces.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -28 Construction activities within the existing water treatment facility would be limited in scope and would primarily consist of localized site improvements, with minimal use of off-road construction equipment and correspondingly low DPM emissions. On-site excavation, grading, and material hauling associated with export of soils for the proposed new basins would generally take place in the northern portion of the NBRWTP facility, away from the nearest sensitive receptors that are located near the southern boundaries of the NBRWTP facility, thereby further reducing potential exposure at receptor locations. The majority of construction-related DPM emissions would be associated with installation of the new pipeline alignment. Most of the pipeline corridor extends through areas with no adjacent sensitive receptors. Where the alignment does approach residential land uses along the northern segment, construction activities would be linear and mobile in nature, advancing along the corridor rather than occurring at a fixed location for an extended duration. As a result, no single receptor location would be subject to sustained exposure from concentrated construction emissions. Based on the characteristics described above and the low construction emission estimates, a quantitative construction health risk assessment is not warranted for the Project. Overall, the potential for prolonged exposure to construction TACs is limited and significant construction-related health risk impacts are not expected.
Operational emissions associated with the completed Project would be minimal and would consist primarily of employee commute trips, occasional maintenance activities, chemical delivery vehicles, and operation of treatment and pumping equipment. The additional pumps would be electric-powered and would not result in TAC emissions. The new stationary equipment, including emergency generators, would result in a potential increase in TAC emissions; however, the backup generators would be operated only during emergency situations and would not represent a continuous source of emissions. In addition, the nearest sensitive receptors are approximately 540 feet west of the center of the NRWTP site, allowing for substantial dispersion of DPM before reaching these receptors. Furthermore, as shown in Table 4.3.B, operational emissions would be well below the applicable Air District significance thresholds. The Project would not include substantial increases in diesel truck traffic, or other activities that would generate substantial concentrations of criteria pollutants or toxic air contaminants. As a result, operation of the Project would not create a localized air quality hotspot or a new source of diesel particulate matter that would expose nearby sensitive receptors to substantial health risks.
Based on the discussion above, the Project would not expose sensitive receptors to substantial pollutant concentrations, and impact would be less than significant. d. Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less Than Significant Impact. Typical sources of objectionable odors include wastewater treatment facilities, landfills, composting operations, rendering plants, confined animal facilities, and certain industrial operations. The Project consists of expansion and modernization of the existing NBRWTP and construction of an underground transmission pipeline. Unlike wastewater treatment facilities, potable water treatment facilities, like the NBRWTP, generally do not generate substantial odor emissions because treatment processes primarily involve filtration, chemical treatment, and disinfection of drinking water supplies.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-29 Construction of the Project would result in temporary emissions associated with operation of heavy-duty equipment, construction vehicles, paving activities, coatings, solvents, and other construction-related activities. These activities may generate localized odors such as diesel exhaust, asphalt, paint, or fuel odors. However, construction-related odors would be temporary, intermittent, and confined to active work areas. Construction activities would progress along the pipeline alignments and would not remain at a single location for extended periods. Therefore, any odor impacts would be localized and would not affect a substantial number of people.
Operation of the expanded NBRWTP would continue the existing potable water treatment processes currently conducted at the facility and would not introduce new odor-generating industrial activities. The facility treats raw water for potable use and is not a wastewater or sewage treatment plant. Although the facility includes lagoons used for management of treatment residuals generated during the potable water treatment process, the Project would not introduce sludge digestion, biosolid processing, wastewater treatment, or other activities commonly associated with objectionable odors. In addition, operation of the underground transmission pipeline would not generate odors. The expanded NBRWTP would continue to operate in a manner similar to existing conditions, and no substantial new odor sources would be introduced.
Therefore, the Project would not result in odor emissions adversely affecting local residents, and impacts would be less than significant.
4.3.4 Mitigation Measures
No mitigation measures are warranted.
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -30
4.4 BIOLOGICAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a
candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
b. Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
c. Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
e. Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
f. Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
4.4.1 Baseline Conditions
The following discussion and analyses are based on the findings included in the Aquatic Resources Delineation Report 17 and Biological Resources Report 18 completed for the Project, which are included as Appendix B to this IS/MND.
4.4.1.1 Topography and Hydrology
The Project site and pipeline alignments are on the eastern edge of California’s Coastal Range and the western side of California’s Central Valley. The topography within undeveloped portions of the Project site consists of generally flat to undulating terrain typical of the valley floor, with Cement Hill 17 LSA Associates, Inc. (LSA). 2026a. Aquatic Resources Delineation Report, Fairfield Vacaville Water Works Project, Solano County, California. June. 18 LSA. 2026b. Biological Resources Report, Fairfield Vacaville Water Works Project, Solano County, California. June.
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-31 to the west and a small northwest-southeast trending ridge to the east of the Linear Trail pipeline alignment. The average elevation is approximately 125 feet above mean sea level.
The North Bay Regional Water Treatment Plant (NBRWTP) and the portion of the Linear Trail pipeline alignment that closely follows Putah South Canal as well as the southern portion of the alternate alignment along Peabody Road fall with the McCoy Creek Watershed. The remainder of both pipeline alignments north of the canal crossing falls within the Union Creek watershed. Both watersheds ultimately drain to Suisun Bay and are within the San Francisco Bay Drainage Province.
4.4.1.2 Soils
Soils on the Project site are mapped as Antioch-San Ysidro complex, 0 to 2 percent slopes; Antioch-San Ysidro complex, thick surface, 0 to 2 percent slopes; Brentwood clay loam, 2 to 9 percent slopes; Capay silty clay loam, 0 percent slopes; Diablo-Ayar clay, 2 to 9 percent slopes; Diablo-Ayar clays, 9 to 30 percent slopes, MLRA 17; Rincon clay loam, 0 to 2 percent slopes, San Ysidro sandy loam, 0 to 2 percent slopes; and San Ysidro sandy loam, 2 to 5 percent slopes, and Antioch-San Ysidro complex, 0-2 percent slopes. These soils are classified as moderately well drained to well drained; none are classified as hydric soils.
4.4.1.3 Potentially Jurisdictional Waters
Potentially jurisdictional waters identified on and adjacent to the Project site and pipeline alignments consist of Union Creek, three ponds with wetland vegetation, numerous small seasonal wetlands, and a headwater channel to McCoy Creek. Drainage ditches and culverts within the NBRWTP convey water south to two wetland channels at the south end of the property. The Putah South Canal (used for irrigation) is also within the Project boundaries along with NBRWTP water treatment ponds; these features and possibly the drainage canals, subject to verification by the United States Army Corps of Engineers and Regional Water Quality Control Board, are likely exempt from jurisdiction as waters of the United States under Section 404 of the Clean Water Act and as waters of the State under the Porter-Cologne Water Quality Control Act (Porter-Cologne Act).
4.4.1.4 Vegetation
General habitats within the Project site consist of nonnative grassland, ruderal, planted areas, seasonal wetlands, stream/riparian, and developed areas.
Nonnative Grassland. Nonnative grassland is the dominant vegetation community along the pipeline alignment. Floristic surveys of the site have not yet been completed, but species common to nonnative grasslands in the area include long-beaked filaree (Erodium botrys), white-stem filaree (Erodium moschatum), rip-gut brome (Bromus diandrus), wild oats (Avena fatua), medusa-head (Elymus caput-medusae), soft chess (Bromus hordeaceus), hare barley (Hordeum murinum ssp. leporinum), Italian ryegrass (Festuca perennis), rat-tail fescue (Festuca bromoides), burr clover (Medicago polymorpha), subterranean clover (Trifolium subterraneum), and purple star-thistle (Centaurea calcitrapa).
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -32 Ruderal. Largely barren areas with scattered weedy species occur along the Putah South Canal and old railroad grade. Species noted in these areas were mustard (Brassica sp.) and yellow star-thistle (Centaurea solstitialis).
Planted Areas. Planted and ornamental vegetation occurs within developed portions of the Project area. Within the NBRWTP, planted trees occur around the existing solar arrays and other maintained facility areas. Along portions of the Peabody Road Pipeline Alignment, ornamental landscaping and roadside vegetation are present adjacent to developed land uses. A maintained oleander (Nerium oleander) hedgerow also occurs along the northwestern side of Peabody Road adjacent to California State Prison, Solano. Where present, the understory within these areas consists primarily of nonnative annual grassland and ruderal vegetation described above.
Seasonal Wetlands. Seasonal wetlands were delineated in the NBRWTP and along both alternative pipeline alignments. Floristic surveys of the site have not yet been completed, but species noted in these wetlands during the aquatic resources delineation included spear-leaved orache (Atriplex prostrata), Italian thistle (Carduus pycnocephalus), bindweed (Convolvulus arvensis), saltgrass (Distichlis spicata), alkali heath (Frankenia salina), summer mustard (Hirschfeldia incana), perennial pepperweed (Lepidium latifolium), wild radish (Raphanus raphanistrum), curly dock (Rumex crispus), cattail (Typha latifolia), and cocklebur (Xanthium strumarium).
Within the fenced boundaries of the NBRWTP, several small, highly disturbed seasonal wetlands and ephemeral drainage channels are present in undeveloped portions of the facility. These features have been influenced by past grading, utility development, and ongoing maintenance activities and support a mixture of native and nonnative wetland vegetation. Plant species observed within these disturbed wetlands and channels include blue wild rye (Elymus glaucus), alkali heath (Frankenia salina), bristly ox-tongue (Helminthotheca echioides), perennial pepperweed (Lepidium latifolium), annual rabbitsfoot grass (Polypogon monspeliensis), curly dock (Rumex crispus), and cattail (Typha spp.).
Streams. The headwaters of Union Creek flow through the Project site and a drainage that forms the headwaters to McCoy Creek borders the southern edge of the treatment plant. Union Creek in this area is an intermittent stream and receives runoff from developed areas in the southern portion of Vacaville and from undeveloped land within the Project site and from Cement Hill to the west.
Vegetation within the channel consists of dense stands of cattail (Typha sp.) at input and outfalls of the large CMPs and concrete cover structure at the proposed linear trail alignment crossing the Union Creek Channel location. Cattail, blue wild rye, and willowherb (Epilobium sp.) were noted along the creek north of the crossing. The headwater area for McCoy Creek supports similar vegetation characteristics.
Riparian. Riparian habitat consists of red willows growing along the edge of a detention basin off Peabody Road and Union Creek at the northern end of the Project site.
Developed. Areas within the treatment plant are largely developed, containing personnel buildings, operation and maintenance buildings, treatment structures and equipment, sediment lagoons, and a photovoltaic array. Unvegetated (rock or earthen) drainage ditches and culverts also occur within
INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT
F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-33 these areas. The Peabody Road Alignment also contains Peabody Road, medium density housing, and lands associated with the California State Prison Solano facility.
4.4.1.5 Wildlife
Wildlife observed within the Project area is representative of the developed, annual grassland, seasonal wetland, riparian, and landscaped habitats associated with the NBRWTP and the Linear Trail and Peabody Road Pipeline Alignments. The wildlife community is composed primarily of common resident and migratory species typical of disturbed and semi-natural habitats in the Fairfield-Vacaville region. Songbird species that may be found in the grasslands include western kingbird (Tyrannis verticalis), western meadowlark (Sturnella neglecta), cliff and barn swallows (Hirundo pyrrhonata and H. rustica), and horned lark (Eremophila alpestris). Birds of prey species may include red-tailed hawk (Buteo jamaicensis), American kestrel (Falco sparverius), golden eagle (Aquila chrysaetos), great horned owl (Bubo virginianus), barn owl (Tyto alba), turkey vulture (Cathartes aura), Swainson’s hawk (Buteo swainsoni), and burrowing owl (Athene cunicularia).
Common reptile species associated with this natural community include gopher snake (Pituophis catenifer), racer (Coluber constrictor), and western fence lizard (Sceloperus occidentalis).
Common mammal species include deer mouse (Peromyscus maniculatus), California vole (Microtus californicus), raccoon (Procyon lotor), striped skunk (Mephitis mephitis), and coyote (Canis latrans).
Union Creek, irrigation canals, and ponds in the area provide suitable habitat for species such as mallard (Anas platyrhynchos), cinnamon teal (Anas cyanoptera), belted kingfisher (Ceryle alcyon), American bullfrog (Rana catesbeiana), mosquito fish (Gambusia sp.), northwestern pond turtle (Actinemys marmorata), and Sierran treefrog (Pseudacris sierra).
4.4.1.6 Special-Status Species
Special-status species are defined as follows:
• Species that are listed, formally proposed, or designated as candidates for listing as threatened or endangered under the federal Endangered Species Act or California Endangered Species Act. • Plant species assigned to California Rare Plant Ranks (CRPR) 1A, 1B, 2A, 2B, or 3. • Animal species designated as Species of Special Concern or Fully Protected Species by the California Department of Fish and Wildlife (CDFW).
• Species that meet the definition of rare, threatened, or endangered under Section 15380 of the CEQA Guidelines.
• Species considered as a taxon of special concern by local agencies.