California Uniform Construction Cost Accounting Commission
2.07 California Uniform Construction Cost Accounting Commission Chapter 1054, Statutes of 1983, created the California Uniform Construction Cost Accounting Commission (CUCCAC or the Commission). The Commission is comprised of 14 members, 13 members are appointed by the State Controller and one member of the Contractors’ State License Board pursuant to section 22010 of the Public Contract Code.
a) Thirteen of the members shall be appointed by the Controller as follows:
1) Two members who shall each have at least 10 years of experience with, or providing professional services to, a general contracting firm engaged, during that period, in public works construction in California.
2) Two members who shall each have at least 10 years of experience with, or providing professional services to, a firm or firms engaged, during that period, in subcontracting for public works construction in California.
3) Two members who shall each be a member in good standing of, or have provided professional services to, an organized labor union with at least 10 years of experience in public works construction in California.
4) Seven members who shall each be experienced in, and knowledgeable of, public works construction under contracts let by public agencies; two each representing cities, counties, respectively, and two members representing school districts, and one member representing a special district. At least one of the two county representatives shall be a county auditor or his or her designee. b) The member of the Contractors’ State License Board who is a general engineering contractor as that term is defined in Section 7056 of the Business and Professions Code shall serve as an ex officio voting member.
2.08 Implementation
The public agency must perform several administrative steps to comply and elect into the law. The major steps include:
Adopting a resolution electing to become subject to the Act. Adopting ordinances or regulations providing informal bidding procedures as required by the law. Notifying the State Controller of the election.
Complying with the cost accounting construction policies and procedures presented in this manual.
The Commission shall review the accounting procedures of any participating agency where an interested party presents evidence that the work undertaken by the public agency falls within any of the following categories stated in Public Contract Code section 22042:
Is to be performed by a public agency after rejection of all bids, claiming work can be done less expensively by the public agency.
Exceeded the force account limits.
Has been improperly classified as maintenance.
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 3 UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING POLICIES
AND PROCEDURES
Table of Contents
Uniform Public Construction Cost Accounting Policies and Procedures ..............................................................44
3.01 CUCCAC Philosophy............................................................................................................................ 44
3.02 Applicable Projects............................................................................................................................. 44
3.03 Definitions.......................................................................................................................................... 45
3.04 Public Agency Organization Structure................................................................................................ 46
3.05 Classification of Costs......................................................................................................................... 46
3.06 Direct Costs ........................................................................................................................................ 47
3.07 Indirect Costs...................................................................................................................................... 49
3.08 Overhead Costs .................................................................................................................................. 49
3.09 Project Identification.......................................................................................................................... 50
3.10 Project Tracking.................................................................................................................................. 50
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 3 UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING POLICIES
AND PROCEDURES
Uniform Public Construction Cost Accounting Policies and Procedures The California Uniform Construction Cost Accounting Commission (CUCCAC) is responsible for reviewing and developing uniform public construction cost accounting policies and procedures to be followed by public agencies electing to participate in the program. This section of the manual discusses the Commission’s basic philosophy and intent in developing these cost accounting policies and procedures, the range of public construction projects that may be undertaken by public agencies using these cost accounting policies and procedures, and the support systems deemed necessary to comply with this program.
Inquiries regarding the program and/or the policies and procedures may be sent to the State Controller’s Office (SCO) Local Government Policy Section at [email protected]. Once an inquiry is received by SCO staff, it will be reviewed and a draft response will be sent to the Chair of the Commission. The Chair may appoint one or more Commissioners, not to constitute a quorum, from the public and/or private sectors to assist with responding to the inquiry in a timely manner. The Chair will provide feedback as necessary, and SCO staff will reply to the inquirer in a timely manner. A summary of inquiries is to be reviewed by the Commissioners at the next CUCCAC meeting, for incorporation into the Frequently Asked Questions as appropriate.
3.01 CUCCAC Philosophy
The policies and procedures, as dictated by Public Contract Code section 22017, shall, to the extent deemed feasible and practicable, incorporate or be consistent with construction cost accounting guidelines and standards and reporting requirements utilized by state and federal agencies on public projects and be uniformly applicable to all public agencies which elect to utilize the policies and procedures. The Commission recognizes the wide divergence in the size, capabilities and scope of operations of various public agencies operating under this legislation. Therefore, in developing this manual, the Commission wishes to present policies and procedures that are reasonable and do not demand extensive tracking of detail. The Commission feels that all cost elements, including personnel, materials, supplies and subcontracts, equipment, and overhead, associated with a project must be recorded and reported at the project level. Each of the cost elements is to be expressed in the initial bid/estimate process, captured and recorded during the construction period and compared to the initial estimate at the conclusion of the public project. This shall require the existence of a project tracking system, as discussed later in this section. The Commission refrains from dictating a specific system but requires a system to estimate for bidding purposes, and to capture the actual costs in a manner consistent with the bid estimate. In this manner, the policies and procedures are results-oriented. The Commission has determined that the Standardized Account Code Structures meets the requirements of the Act.
3.02 Applicable Projects
In keeping with the Commission's objective of providing cost accounting policies and procedures that are specific in concept yet broad enough to encompass all public agencies, regardless of size and scope of services, these policies and procedures should enable the public agencies to track all applicable construction-oriented public projects.
While allowing for the divergence of activities performed, these policies and procedures should parallel construction cost accounting practices as much as possible to allow for a comparability of private and public estimates and actual costs incurred in constructing public projects.
3.03 Definitions
The definitions listed below will assist users of the manual in interpreting and understanding the policies and procedures as stated in this manual. It is important to note that these definitions pertain only to the contents of this manual.
Cost Finding. A less formal method than project accounting of cost determination or estimation on an irregular basis. There may be no formal accounting entries during the year to record costs incurred in specific cost accounts. Instead, cost finding usually involves taking available fund financial accounting data and recording it and adjusting it to devise the cost data or estimate needed. This approach will be used in selected instances as defined in this manual.
Direct Costs. Direct costs represent economic resources that can be specifically identified with a particular construction activity or function. To the extent possible, such costs should be charged directly to the project for purposes of cost determination rather than being subjected to allocation procedures.
End Cost Objective. An end cost objective is a cost center or activity established for the accumulation of the direct costs of performing government services. All costs should be considered to indirectly support the performance of these services.
Equipment Usage Tracking System. An equipment usage tracking system allows for the identification, recording, accumulation and reporting of usage of a specific piece of equipment or type of equipment and the unit of usage, e.g., hours, days, mileage, to a particular activity.
Force Account. A force account accurate for work performed on public projects using internal resources, including but not limited to labor, equipment, materials, supplies, and subcontracts of the public agency.
Government-Wide Overhead. Government-wide overhead is defined to include all costs of a public agency not associated with organizational units performing services which support all end cost objectives of the government entity.
Materiality. It is the Commission’s position that, if the value of those goods obtained from inventory is material, the cost must be recorded to the public project code as a direct cost item. Materiality is defined for purposes of this manual to be any item that has a unit or aggregate value of $25 or more.
Materials, Supplies, and Subcontracts Tracking System. A materials, supplies, and subcontracts tracking system allows for the identification, recording, accumulation, and reporting of materials, supplies, and subcontracts used on a particular activity.
Object Cost. A cost center or activity (account code assigned to a department or project) established for the accumulation of the direct and indirect cost to arrive at a total cost of performing government services.
Overhead Costs. Overhead costs represent economic resources that are employed for common or joint purposes benefiting several projects or functions. As such, overhead costs are not as readily chargeable to individual projects and, therefore, generally require allocation based upon statistical relationships.
Personnel Tracking System. A personnel tracking system allows for the identification, recording, accumulation, and reporting of personnel working on a particular activity.
Project Accounting. Project accounting is the continuous process of analyzing, classifying, recording, and summarizing cost data within the confines and controls of a formal project accounting system and reporting them to users on a regular basis.
Project Tracking System. A project tracking system allows for the identification and establishment of cost (account) codes to particular activities. The system would be used to record, accumulate, and report personnel costs; equipment costs; material, supplies, and subcontracts costs; and allocated overhead to activities identified.
Public Project Unit. A public project unit (e.g. public works department) is an identifiable organizational unit of any size within a public agency whose primary goals include the undertaking and completion of public projects as defined in Public Contract Code section 22002. The Commission would, in general, consider a unit to be a public project unit when over 25% of the total unit's annual budget is expended on public projects. It is more common to have these organizational units in the larger public agencies - urban counties, cities, and school districts.
Subcontract. A subcontract provides for the use of an outside contractor with specialized skills and/or equipment needed to complete an element of work on the public project.
Unit Overhead. Unit overhead is defined as all costs incurred by an organizational unit, such as a public project unit, department, division or section, that are not directly attributable to any end cost objective, whether it be a public project or not. These costs include personnel costs, materials, supplies and subcontracts, and equipment costs not directly attributable to any end cost objective.
Work Order. A work order is written authorization for the performance of a particular project. It contains a description and location of the project and specifications for the work to be performed. Work orders are assigned an identification code and are used to record all costs both direct and indirect incurred in completing the project.
3.04 Public Agency Organization Structure
In general, public agencies will contract out design-and-build and heavy construction projects and perform only general building projects and specialty construction projects with internal resources. Frequently, this decision to undertake general building and specialty construction projects is made based on the agency's organization structure, current workload requirements, and available staffing resources.
Often, in large organizations, due to the ongoing workload, there are organizational units whose stated objective is to undertake and complete on an as-needed basis general building and specialty construction projects. These organizational units are project-oriented. Their end cost objectives primarily consists of the performance of public projects. Costs specifically incurred in connection with individual end cost objectives are considered to be direct costs. Costs not specifically incurred to support individual and cost objectives are considered to be overhead costs associated with the organizational units taken as a whole. To recognize all the costs associated with an end cost objective, these overhead costs must be allocated back to this end cost objective. Examples of end cost objectives include public projects, such as the construction of a warehouse, renovation of a lunch room, or street reconstruction and resurfacing over 1 inch. Smaller public agencies, which comprise the majority of public agencies in the state, usually do not have organizational units whose annual budgets represent more than 25% of public project work. Frequently, these employees perform general maintenance duties in addition to working on public projects. The public project costs incurred by these employees are more difficult to identify yet equally important.
3.05 Classification of Costs
It is the stated objective of the law and the Commission to have public agencies estimate the cost of public projects and track these project costs in a manner similar to private industry. Essential to achieving this
objective is the understanding and agreement by both parties as to the components of costs that are included in public projects.
The major classification of cost components for construction projects includes: direct, indirect, and overhead costs.
3.06 Direct Costs
Direct costs generally include these categories of costs: labor, bonds, permits, licensing fees (if any), equipment, permanent materials and supplies, subcontracts, nonpermanent materials and supplies. Components of each of these direct project cost categories are shown below and include costs applicable to the construction industry.
Labor
Hourly Pay/Salary
Payroll Taxes (Employer Contribution)
Worker’s Compensation Insurance (Allocation of Self Insurance) Group Health Insurance
Group Life Insurance
Retirement Plan (Employer Contribution)
Holiday Leave
Vacation
Sick Leave
Unassigned Time
Disability Insurance
Unemployment Insurance
Military Leave
Jury Duty Leave
Management Leave/Compensatory Leave
Uniform/Uniform Allowance
Tuition Reimbursement
Union Time Off
Time Off for Illness or Death of Family Member
Personal Liability Insurance
Administration/Employer Contribution of Deferred Compensation Program/401K Overtime Premium
Use employee’s productive hourly rate to calculate direct labor costs.
Equipment
Internal Equipment Rate
Depreciation
Insurance (Allocation of Self Insurance)
Initial Assembling and Dismantling Costs
Maintenance Costs
Repair Costs
Provision for Major Overhauls
Unassigned Time
Maintenance and Storage Yard Facilities Costs
Fuel and Oil
Tires and Grease
Or Use:
Caltrans Equipment Rental Rates and Labor Surcharge Book:
http://www.dot.ca.gov/hq/construc/equipmnt.html
External Equipment Rate (Leased or Rented from Commercial Dealer) which includes, if charged by the Lessor or are the responsibility of the agency, the following costs:
Rental Rate
Maintenance Costs
Assembling and Dismantling Costs
Insurance Costs
Fuel and Oil
Tires and Grease
Permanent Materials and Supplies
Cost of Permanent Materials and Supplies-Charged Directly to Job Permanent Materials and Supplies Cost
Sales/Use Tax
Freight
Discounts Taken
Cost of Permanent Materials and Supplies Costs
Substantiated by most recent Invoice
Handling
Warehouse and Transportation Costs
Subcontracts
Payments made to Subcontractors
Nonpermanent Materials and Supplies/Miscellaneous Costs Permits
Fees
Performance Bonds
Licenses
3.07 Indirect Costs
Indirect costs can be identified with a project but not with a specific job or unit of production within the project.
Indirect costs generally include two categories of costs: labor and other miscellaneous project site expenses.
Components of each of these indirect cost categories are shown below.
Labor
Quality Control and Inspection
Field Supervisors
Security Guards
Superintendent
Job Secretary
Other Project Expenses
Mobilization, Assembly, Move-Out Costs
Yarding and Hauling
Trailer
Utilities
Telephone
Warehouse Costs
Spoilage, Loss and Theft
Other Costs
3.08 Overhead Costs
Simplified Overhead Rate
Prior to January 1, 2004, the Commission allowed all agencies to use a 20% overhead rate applied to all direct costs in lieu of calculating their overhead rates. An amendment to Public Contract Code section 22017 provides that cities with a population of less than 75,000 can assume the 20% rate. Cities with a population of 75,000 or over can either assume a 30% overhead rate or calculate an actual overhead rate.
Calculated Overhead Rate
The Commission determined that counties, special districts, and school districts can use a 30% rate or calculate an actual overhead rate, which is the same rule that applies to cities with a population of over 75,000.
Agencies may elect to calculate their overhead rates by one of the three following methods:
1) Appendix A describes the federal government’s method of calculating overhead (2 CFR Part 220). 2) Appendix B describes a method of calculating overhead by allocating overhead costs as a percentage of direct labor costs.
3) Any method of calculating overhead is satisfactory with the Commission, provided that acceptable accounting procedures are used and all administrative costs are included.
Overhead costs should be applied on total project costs, including costs of material, equipment, and labor.
Overhead costs cannot be identified with or charged to jobs or units of production unless some more or less arbitrary allocation basis is used.
Components of overhead are shown below and include costs applicable to the construction industry, public agencies or both, e.g., public agencies do not have to pay surety bond premiums as does the construction industry to perform construction work, but both have costs incurred due to the processing of payroll.
Payroll
Personnel
Purchasing/Procurement
Bid/Estimate Expense
Advertising Expense
Legal Costs
General Government
General Accounting/Finance
Departmental Accounting/Finance
Facilities
Data Processing
Top Management
Management Expenses
Typically public agencies recognize only two classifications of costs: direct and overhead.
It is important to note that this does not suggest that public agencies exclude indirect costs but rather that they classify a majority of them as direct costs. For example, in the construction industry a foreman supervising employees working at the job site would have his personnel costs pooled and allocated to a job or unit of production. In a public agency, the foreman's labor cost would be charged directly to the appropriate public projects.
Regardless of the differences in how the various costs are classified, both the construction industry and public agencies recognize that the significant cost elements of any construction project include:
Personnel
Materials, supplies and subcontracts
Equipment
Overhead
3.09 Project Identification
Public projects, as defined in section 2.03, shall be identified and given specific project codes. These codes are generally referred to as project or work order numbers. These codes shall enable the public agency to segregate the cost elements discussed above, thereby allowing for the proper estimation, tracking, and comparison of estimated vs. actual cost elements incurred at the completion of a public project.
3.10 Project Tracking
The public agency shall have a manual or automated system that records, accumulates, and periodically reports the cost elements - personnel; materials, supplies and subcontracts; equipment; and overhead - incurred in completing all public projects. The public agency shall be required to account for the costs of the public project in a manner consistent with the way in which the project was bid/estimated. An audit trail of the accumulation of these cost elements shall be maintained. Source documents shall be retained identifying costs incurred on the project. These documents may include timesheets, equipment tracking records, requisitions of materials
and supplies used at the project site, and the documentation of the development of overhead rates. The project tracking system does not have to be a part of the public agency's fiscal system but should capture the major cost elements and comply with the other requirements stated in this manual. This may require the agency to establish a project tracking system or alter an existing cost accounting system.
Project Tracking Systems
Project tracking refers to the management of projects which includes but is not limited to measuring and reporting the status of milestones, tasks and activities required in achieving the pre-defined project results.
Project tracking can also refer to project management software which automates the tracking of tasks, assignments, event and activities related to the project.
Most counties and larger school districts, cities, and special districts have established automated cost accounting systems that can track all identified public projects. Other project tracking systems include work order systems and project ledger card systems.
Work orders are written authorizations for the performance of a particular project. They contain a description and location of the project and the specifications for the work to be performed. These authorizations, used extensively by public agencies, are assigned an identification code and are used to accumulate and report labor, materials and supplies, and other costs associated with the project. Work orders can be used to cost public project work, as well as maintenance work and other types of end cost objective work.
A project ledger card system establishes a single ledger card to be used in recording, in summary, all cost elements associated with a particular public project.
Discussion of Example
An excel spreadsheet, is listed as a template named Sample Estimating Form and is available online at http://www.sco.ca.gov/ard_cuccac.html
The sample project ledger card has been established by the school district's accounting area to estimate the costs of remodeling the Main Street School. This sample can be used for estimating a project. The following data elements are included on the ledger card to establish the public project:
Project code
Start date
End date
Person responsible for work
Name of project
Chapter 4 IDENTIFICATION, REPORTING, AND COMPUTATION OF PERSONNEL COSTS
Table of Contents
Identification, Reporting, and Computation of Personnel Costs..........................................................................54 Tracking Personnel Time.......................................................................................................................................54
4.01 Timekeeping System .......................................................................................................................... 54
4.02 Examples of Timekeeping Systems .................................................................................................... 54
4.03 Application of Timekeeping Systems ................................................................................................. 55
4.04 Recording Time to Public Projects...................................................................................................... 56 Computing Personnel Costs..................................................................................................................................56
4.05 Productive Hourly Rate ...................................................................................................................... 56
4.06 Unit Overhead Rate............................................................................................................................ 58
4.07 Government-Wide Overhead Rate .................................................................................................... 58
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 4 IDENTIFICATION, REPORTING, AND COMPUTATION OF
PERSONNEL COSTS
Identification, Reporting, and Computation of Personnel Costs The accurate estimating, tracking and costing of personnel costs is imperative to ensure accurate reporting and future estimating of these costs. Personnel costs are those costs associated with employing public agency personnel in the performance of a specific job. They include three elements:
1) Annual salary or wage paid by the public agency.
2) Benefits received by employees such as a public agency’s contribution to employee retirement programs, group health plans, and unemployment insurance. 3) Benefits paid to employee such as salaries or wages paid to employees who are on holidays, vacation leave, and sick leave.
This section of the manual describes the systems and methods used to track personnel time, determine the costs associated with personnel, and record these costs to a project tracking system.
Tracking Personnel Time
Critical to the public agency’s determination of personnel costs is the ability to identify time spent by employees performing work on all public projects.
4.01 Timekeeping System
A public agency shall have a timekeeping system that accumulates hours worked by employees and assigns these hours to all public project codes. Typically, this project code is assigned by the agency's accounting department and conveyed to the person responsible for the public project, generally the foreman or equivalent position. This system shall enable the agency to track hours worked on public projects to allow for the subsequent distribution of the appropriate personnel costs.
4.02 Examples of Timekeeping Systems
The simplest of timekeeping records is a foreman's time book. These books usually have 50 pages and the foreman records on a daily or weekly basis the employee and his daily time spent on a particular project. These books have heavy tagboard covers so they can remain at the job site and be carried in a foreman's pocket.
Typically, at the week's end, the foreman's time book is copied onto timesheets or timecards. This may be done at the central office by the foreman, timekeeper, payroll clerk or bookkeeper. This timekeeping system has the advantage of actual timekeeping being performed at the job site; but if the book is lost, the entire project's time record is lost.
Weekly timesheets or timecards and electronic timekeeping systems can also be used to record time. These documents should be completed by employees no later than at the end of the week showing the hours worked on each public project. For the employees to complete the cards or sheets, they must be informed of the appropriate project code to charge. This appears to be an insignificant issue; but without the establishment of a project code and the conveyance of that information to personnel working on the public project, the costs may never get recorded accurately. This decentralization of timekeeping presents the opportunity for possible inaccuracies in the recording of time spent on public projects. Therefore, this system may warrant additional review by management.
Work orders can be used to record time by the appropriate employee. As discussed in the project tracking requirements, work orders are written authorization for the performance of a particular job containing a project code, a description and location of the job, and specifications for the work to be performed. Work orders are the most frequent public project timekeeping systems used by public agencies. These are generally completed by the supervisor of the public project who records the employees’ time spent on a public project.
It is important to note that work performed on public projects, unlike timekeeping in the construction industry, requires close supervision by management to ensure that hours worked on end cost objectives as defined by this manual are recorded properly.
4.03 Application of Timekeeping Systems
As discussed earlier, there are two types of organizational units within public agencies that may perform public project work. These are (1) public project units and (2) other organizations that may, in addition to their primary duties, work on public projects.
Public Project Unit
A public project unit is an identifiable organizational unit of any size whose primary goals include the undertaking and completion of public projects. Typically, these units perform construction, reconstruction, erection, alteration, renovation, improvement, demolition, repair work, and painting of any publicly owned, leased, or operated facility. For example, a public works department may have a division/section comprised of employees who as defined by this bill are dedicated to the undertaking and completion of public projects such as road resurfacing, painting, landscaping and building/remodeling. The Commission would, in general, consider a unit to be a public project unit when over 25% of the total unit's annual budget is expended on public projects.
It is more common to have these organizational units in the larger public agencies--urban counties, cities and school projects.
Timekeeping Requirements
Employees who generally are considered direct labor and are assigned to a public project unit shall record their time on an hourly basis and record all hours of a full work day. This includes time spent on public projects as well as time spent on projects excluded from this program. Unassigned time by these employees will also be recorded and charged to an appropriate code.
Employees not performing labor on public projects, but who provide administrative support services to the employees of the public project unit, shall also record their time on an hourly basis and record all hours of a full work day. This time will be charged to an appropriate overhead account and will be used in the development of the organizational unit's overhead rate as discussed in Chapter 7.
Other Organizational Units Performing Work on Public Projects There are other organizational units that have employees who perform work on public projects but whose primary goal is the performance of routine maintenance work and/or other general government services.
Typically, these organizational units include: parks and recreation departments; divisions of public works agencies that have not been identified specifically as public project units, such as engineering; water and sewer; street maintenance; and routine maintenance.
a. Timekeeping Requirements
Employees of these organizational units shall report time worked on public projects. Although the Commission strongly believes that it is advisable for employees to record an eight-hour day to various end cost objectives, work performed outside of public projects is excluded from the scope of the program and is not required to be reported. All time worked on public projects by a public agency employee shall be posted to a project tracking system on a timely basis with an adequate audit trail maintained.
b. Discussion of Example
An employee of an organizational unit who performs work on a public project, but whose organization is not identified as a public project unit, must report his time. The employee has recorded only the time worked on a public project. Unit management, employees performing maintenance work, and unassigned employees need not record their time as do similar employees in a public project unit.
4.04 Recording Time to Public Projects
A public project’s direct labor time shall be recorded to a project code under the following circumstances:
The employee worked on a public project.
The employees were in transit to or from a project site. The employee performed clean-up work on a public project, e.g., the employee returned to central headquarters to complete paperwork attributable to a public project. The employee was assigned to work on a public project but was unable to work due to unforeseen circumstances, e.g., equipment breakdown or inclement weather, and was therefore idle.
Computing Personnel Costs
In determining personnel costs, three different rates must be determined and applied: the employee’s productive hourly rate, the department’s overhead rate, and the general government overhead rate.
4.05 Productive Hourly Rate
Personnel costs in many public projects represent the single largest cost of a public project. In calculating these costs it is important to include the three components of personnel costs:
1) Annual salary/wages
2) Benefits received
3) Benefits paid
The calculation of an hourly rate integrating these three costs components is commonly called a “productive hourly rate.”
A productive hourly rate shall be used to cost time reported to public projects. A productive hourly rate determines the full costs per hour of employing public agency personnel on a public project. A productive hourly rate is calculated by dividing annual personnel costs by an employee’s available hours for work assignment.
Annual Personnel Cost
The annual personnel costs of an employee or class of employees shall be determined by the public agency.
These costs shall include annual salary/wages and fringe benefits paid by the public agency.
Fringe benefits are generally calculated as a percentage of annual salary/wages or as an annual cost per employee.
If the productive hourly rate is calculated by employee class, members of each class should have reasonably comparable fringe benefits. Otherwise, further division of the employee class should be performed.
Fringe benefit calculations shall take into consideration, but not be limited to, the employer contribution portion of the following costs:
Disability insurance
Life insurance
Retirement plan
Unemployment insurance
Worker’s compensation insurance
Personal liability insurance
The fringe benefits calculation is not required to include accrued benefits, such as sick leave or vacation earned but not taken, as a component of personnel costs. It is recognized that these accrued benefits represent a significant future cost to the public agency. Yet, many public agencies do not account for these costs and would have difficulty in developing accurate figures. If further pronouncements concerning accrued benefits of public agencies are issued, the Commission will determine whether inclusions of these costs are appropriate.
Productive Hours
The public agency shall start with the assumption of 2,080 productive hours in a year if a 40-hour work week is the standard for the public agency. If a 40-hour work week is not the standard, the appropriate number of annual productive hours must be determined by the agency. The public agency shall then determine average annual nonproductive time either by employee, class of employee, or agency-wide. Nonproductive time is time when the employee is not available to work or assignment to work and includes but is not limited to:
Vacation
Sick leave
Holidays
Military leave
Jury duty
Training
4.06 Unit Overhead Rate
Public Project Unit
A unit overhead rate shall be developed for each public project unit. This unit overhead rate shall include all public project costs that are not direct costs. The overhead rate shall be developed and added to the productive hourly rate.
Organizational Unit Performing Public Project Work
A unit overhead rate shall be developed for each organizational unit performing work on public projects in addition to its primary duties. This unit overhead rate shall include all of the organizational unit’s costs that are not direct costs. The overhead rate should be developed and applied to the employee’s productive hourly rate.
4.07 Government-Wide Overhead Rate
A government-wide overhead rate shall be developed to include all costs of a public agency not associated with organizational units performing services that support all end cost objectives of the government entity. The government-wide rate shall be developed and applied to the productive hourly rate after unit overhead has been applied.
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 5 IDENTIFICATION, REPORTING, AND COSTING OF MATERIALS,
SUPPLIES, AND SUBCONTRACTS
Table of Contents
Identification, Reporting, and Costing of Materials, Supplies, and Subcontracts ................................................62 Materials and Supplies…………………………………………………………………………………………………………………………………….62
5.01 Tracking Materials and Supplies......................................................................................................... 62
5.02 Costing Materials and Supplies.......................................................................................................... 62
5.03 Handling/Carrying Cost ...................................................................................................................... 63
5.04 Subcontracts....................................................................................................................................... 63
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 5 IDENTIFICATION, REPORTING, AND COSTING MATERIALS,
SUPPLIES, AND SUBCONTRACTS
Identification, Reporting, and Costing of Materials, Supplies, and Subcontracts Materials, supplies, and subcontracts used on public projects are considered a cost element by the Commission and include such items as lumber, bricks, cement, doors, paint, asphalt, wire, sand, gravel, pipe, and work performed under a subcontract. Materials and supplies used on public projects shall be tracked and charged to project codes as discussed in Chapter 2 and can be accounted for either as direct purchase or inventory.
This section of the manual describes the systems and methods used to track materials, supplies, and subcontracts; determine their value, as well as the other costs associated with providing materials and supplies; and record these costs to a project tracking system.
Materials and Supplies
Critical to the public agency’s determination of personnel costs is the ability to identify time spent by employees performing work on all public projects.
5.01 Tracking Materials and Supplies
The Commission wishes to provide policies and procedures so that public agencies account for public projects in a manner similar to the construction industry. The nature of governmental procurement and inventory practices presents challenges to the public agency’s ability to meet the Commission’s objective of effectively measuring material and supply costs for public projects.
Direct Purchases
Materials and supplies are often purchased directly for use on a public project. The public agency can thus identify the associated dollar value of items purchased to the public project code, which should be identified on the purchase order when the procurement is initiated.
Inventory
It is more difficult to identify the associated costs of items obtained from the public agency’s inventory of materials and supplies, generally maintained at a warehouse or stockroom. The major challenge is identifying and recording the costs of material and supplies utilized for the public project which are obtained from the public agency’s inventory. It is the Commission’s position that, if the value of these goods obtained from inventory is material, the cost must be recorded to the public project code as a direct cost item. Materiality is defined for purposes of this manual to be any item that has a unit or aggregate value of $25 or more.
Items purchased and placed into inventory that would subsequently be used on public projects and which may exceed the $25 limit shall be issued to projects in a manner consistent with good accounting controls.
5.02 Costing Materials and Supplies
Direct Purchase
The total material and supplies costs are the invoiced amount. This amount should be posted to the project tracking system for direct purchases on a timely basis. This recorded amount should include the cost of the materials and supplies, freight, sales tax, use tax and any other appropriate costs.
Inventory
The public agency shall have a method to provide for the valuation of the inventory it releases to public projects.
Acceptable methods include:
First-In, First-Out (FIFO) – The earliest acquired stock is assumed to be used first, the latest acquired stock is assumed to be still on hand. Therefore, when inventory is issued, it is valued at the cost of the earliest acquired stock.
Last-In, First-Out (LIFO) – The earliest acquired stock is assumed to be still on hand, the latest acquired stock is assumed to have been used immediately. Therefore, when inventory is issued, it is valued at the cost of the most recently (latest) acquired stock.
Weighted Average – In this type of inventory valuation system, each purchase of stock is aggregated with the former inventory balances so that a new average unit price is used to price the subsequent issues of inventory.
Recent Costs – The most recent unit costs is applied to units consumed to yield total cost.
5.03 Handling/Carrying Cost
Personnel, equipment and facilities costs are incurred by the public agency to store and transport inventoried items. This is separate and distinct from the cost of procurement that is considered to be recaptured through general government overhead, as discussed in Chapter 4. (If warehousing and transportation costs are not provided by a central organization, it is assumed that these costs are recovered through the government-wide overhead rate).
5.04 Subcontracts
A public agency may wish to complete work on a public project by subcontracting, i.e., hiring an outside contractor to perform a portion of the work.
Subcontractors shall be accounted for in a manner similar to a direct purchase of materials and supplies.
Contracts or purchase orders should be coded with the appropriate project code and the subcontract costs recorded onto the project tracking system in a timely manner. The handling/carrying overhead rate shall be calculated to recover:
Warehouse/storeroom personnel costs
Facility costs of storeroom/warehouse
o Utilities
o Rent
o Insurance
Transportation costs associated with the receipt/delivery of materials and supplies.
CHAPTER 6 IDENTIFICATION, REPORTING, AND COSTING EQUIPMENT Table of Contents
Identification, Reporting, and Costing Equipment................................................................................................66
6.01 Equipment Tracking Systems ............................................................................................................. 66
6.02 Equipment Tracking of Agency Owned/Operated Equipment........................................................... 66 Equipment Usage Rates........................................................................................................................................67
6.03 Internal Rates (Equipment Owned by Public Agency) ....................................................................... 67
6.04 Equipment Rate Books (Equipment Owned by Public Agency) ......................................................... 68
6.05 Rental or Lease Rates......................................................................................................................... 69
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 6 IDENTIFICATION, REPORTING, AND COSTING EQUIPMENT Identification, Reporting, and Costing Equipment
Usage of equipment on public projects is a cost element of performing those public projects. Equipment usage, excluding passenger riding sedans, must be tracked when a piece of equipment is assigned to a public project.
Equipment used on public projects shall be charged to a project cost code. This section describes the systems and methods used to track equipment usage, determine equipment costs, and record the costs to a projects tracking system.
6.01 Equipment Tracking Systems
The public agency shall have a manual or automated system that tracks the appropriate equipment by time, mileage or other usage factor to a public project. The system shall have the capability to track equipment usage to a public project:
When it is in motion to/from a project site;
When at a public project site (whether in use or not), if time is the means of equipment tracking and When at public project site and in use, if mileage or some other mechanism is the means of equipment tracking.
Examples of Tracking Systems
One of the simplest forms for tracking equipment is a weekly timesheet for each piece of equipment that has been assigned to the public project and the time or mileage incurred by the public project. These sheets should be submitted weekly with labor timesheets or cards. They should then be sent to the accounting area and charged to a project tracking system.
6.02 Equipment Tracking of Agency Owned/Operated Equipment As will be seen in this chapter heading Equipment Usage Rates on page 68, the public agency can cost out equipment it owns and operates in one of two ways. The public agency can either utilize internally developed equipment rates or rates from industry equipment rate books.
Internal Rates
When an agency develops internal equipment rates for certain or all types of equipment, that agency must track the time that equipment was used on end cost objectives such as public projects, maintenance work, and unassigned time. This enables the public agency to determine what the equipment's history of productive hours has been. This enables a better forecast of projected productive hours to be made for rate development purposes.
Equipment Rate Book Rates
When an agency utilizes the calculated equipment rate from rate books, it must record the time or mileage the equipment is used on public projects. Since these equipment rates generally factor in idle time, a full tracking of the equipment as performed for "internal rate" equipment is not mandated.
Equipment Usage Rates
There are three acceptable means of determining equipment rates. They include rates developed internally for public agency owned and operated equipment, equipment rate books used by the construction industry and rental or lease rates charged by commercial vendors. Each of these methods attempts to recapture the costs associated with the equipment's purchase and operations, such as depreciation, fuel, maintenance, repair and insurance.
6.03 Internal Rates (Equipment Owned by Public Agency)
Public agencies shall utilize internally developed equipment usage rates that reflect the full cost of owning, operating and maintaining types of equipment. Rates should be developed for classes of equipment and should comply with the following guidelines:
The internal equipment rate methodology shall be documented and an adequate audit trail provided. The costs of depreciation, fuel and oil, equipment storage, and income are to be included in the internally developed rates.
Depreciation
Depreciation is the method used to spread the cost of equipment, capital lease, or replacement value less residual value, over a piece of equipment’s useful life. The public agency’s capitalization policy should be used to determine whether a piece of equipment should be depreciated. Generally, equipment that costs more than $1,000 and has a useful life of more than one year should be depreciated.
Depreciation should be calculated as follows:
1) Useful Life
Depreciation should be based on the average useful life for the piece of equipment in a particular operation.
Determination of useful life should be based on actual or planned retirement and replacement practices. 2) Residual Value
Residual value is the value at disposition (less costs of disposal) estimated at the time of acquisition. In many cases, the estimated residual value is so small and occurs so far in the future that it has no significant impact. As well, residual value may be almost or completely offset by removal and dismantling costs.
Normally, public agency equipment will be used through the end of its estimated useful life and the residual value may be carried at zero. In the event that it is known at the time of acquisition that the capital equipment will not be used for at least 75% of its scheduled useful life, residual value should be estimated. 3) Capital Improvements
Capital improvements are the costs of major overhauls and modifications that add value and prolong the life of a piece of equipment. These costs should be treated as capital expenditures and depreciated over the extended or remaining useful life of either the asset or improvement, whichever is less. 4) Straight Line Depreciation Method
The straight-line depreciation method charges an equal amount for each period of useful life (generally a year). This method is considered the most practical and reasonable method for determining equipment usage costs.
5) Calculation of Depreciation Method
For annual depreciation for capitalized equipment will be estimated as follows:
A. Start with the acquisition cost (purchase price) plus capital improvements, plus all other costs incurred to place the equipment in usage, e.g., transportation, installation. The public agency may choose to utilize replacement value for this calculation.
B. Determine the useful life of the equipment, utilizing applicable guides such as the IRS guide.
C. Compute annual depreciation by dividing the depreciable basis (acquisition cost plus capital improvements less residual value) by the useful life.
D. Maintenance and Repairs
These are costs (labor and parts) that are incurred for maintenance repairs to keep the equipment in normal operating condition. These costs do not include capital improvements that add value to equipment and are accounted for under depreciation. Tires and grease are included in this classification of cost. Typically, a ledger card for each piece of equipment will be necessary to record these costs.
E. Fuel and Oil
These costs include the labor and fuel costs of supplying the equipment with fuel of any type and oil.
F. Equipment Storage Costs
Equipment storage costs include the cost of facilities associated with the use of equipment. These costs include equipment yards, warehouse facilities, and the cost of guards and other security measures.
G. Insurance
These costs include the premiums paid by the public agency (whether self-insured or paid to an outside agency) for equipment insurance.
A good discussion of the calculation of internal equipment rates can be found in State Controller’s Office website, http://www.sco.ca.gov/pubs_guides.html Accounting Standards and Procedures for Counties in the Road Fund Accounting section.
6.04 Equipment Rate Books (Equipment Owned by Public Agency) Public agencies that own equipment used on public projects but do not calculate internal equipment rates shall utilize appropriate private industry equipment rate books. It is understood that industrial rates may include certain costs that are not incurred by public agencies, such as personal property taxes paid on the assessed value of the equipment and interest charges. However, these equipment usage rates in some cases do not include: the cost of fuel or other energy costs to operate a particular piece of equipment; the cost of preparatory work performed before a piece of equipment can be made operative; the costs of dies, blades or welding rods that are normally consumed in the operation of a piece of equipment; or the costs of extraordinary wear and tear. Therefore, the use of industrial rates is assumed to provide a reasonable approximation of internal rates.
Equipment rate books that are acceptable to the commission for use in lieu of internal rates include:
Caltrans Labor Surcharge and Equipment Rental Rates
http://www.dot.ca.gov/hq/construc/equipmnt.html
Mechanical Contractors Association Tool and Equipment Rental Guide National Electrical Contractors Association Tool and Equipment Rental Schedule Use of other guides must first be reviewed and approved by the Commission.
These guides are maintained and updated on a periodic basis by the appropriate agency or association to accurately reflect current costs associated with equipment usage. If a piece of equipment or comparable piece of equipment is not included in an established guide, an internal rate shall be developed or a documented quote from an equipment leasing or rental agency may be utilized.
6.05 Rental or Lease Rates
Rented or leased equipment to be used partially or completely on public projects shall be tracked and have the appropriate amount charged to the public project. Additional costs associated with the leasing or renting of equipment used partially on a public project shall be charged on a pro rata basis, if appropriate to that project.
Costs related to renting or leasing equipment generally include, but are not limited to:
Rates
Moving, loading, and assembly costs
Maintenance and repairs
Insurance
Fuel (under some rate schedules)
CHAPTER 7 IDENTIFICATION, RATE DEVELOPMENT, AND ALLOCATION OF
OVERHEAD
Table of Contents
Identification, Rate Development, and Allocation of Overhead...........................................................................72
7.01 Commission Adopted Simplified Overhead Rate ............................................................................... 72
THIS PAGE INTENTIONALLY LEFT BLANK
CHAPTER 7 IDENTIFICATION, RATE DEVELOPMENT, AND ALLOCATION OF
OVERHEAD
Identification, Rate Development, and Allocation of Overhead
7.01 Commission Adopted Simplified Overhead Rate
Prior to January 1, 2004, the Commission allowed all agencies to use a 20% overhead rate applied to all direct costs in lieu of calculating their overhead rates. Amendments to Public Contract Code section 22017 provides that cities with a population of less than 75,000 can assume the 20% rate. Cities with a population of 75,000 or over can either assume a 30% overhead rate or calculate an actual overhead rate.
The Commission determined that counties, special districts, and school districts can use a 30% rate or calculate an actual overhead rate, which is the same rule that applies to cities with a population of over 75,000.
Agencies may elect to calculate their overhead rates by one of three following methods:
1) Appendix A describes the federal government’s method of calculating overhead (2CFR Part 200). 2) Appendix B describes a method of calculating overhead by allocating overhead costs as a percentage of direct labor costs.
3) Any method of calculating overhead is satisfactory with the Commission, provided that acceptable accounting procedures are used and all administrative costs are included.
Chapter 3, Definitions, lists items that define overhead.
THIS PAGE INTENTIONALLY LEFT BLANK
APPENDIX A COST PRINCIPLES FOR STATE, LOCAL, AND INDIAN TRIBAL
GOVERNMENTS
Table of Contents
Cost Principles for State, Local, and Indian Tribal Governments..........................................................................76
THIS PAGE INTENTIONALLY LEFT BLANK
APPENDIX A Cost Principles for State, Local, and Indian Tribal Governments Cost Principles for State, Local, and Indian Tribal Governments
APPENDIX A COST PRINCIPLES FOR STATE, LOCAL AND INDIAN TRIBAL GOVERNMENTS 2 CFR Part 200
(OMB Circular A-87)
Please refer to:
www.ecfr.gov
Browse: Title 2 – Grants and Agreements
Volume 1, Chapter II, Part 200
THIS PAGE INTENTIONALLY LEFT BLANK
APPENDIX B OVERHEAD DETERMINATION AND ALLOCATION PERCENTAGE OF
DIRECT LABOR COSTS METHOD
Table of Contents
Identification, Rate Development, and Allocation of Overhead...........................................................................80 B.01 Identification, Rate Development, and Allocation of Overhead........................................................ 80 B.02 Unit Overhead .................................................................................................................................... 81 B.03 Government-Wide Overhead............................................................................................................. 82
THIS PAGE INTENTIONALLY LEFT BLANK
APPENDIX B OVERHEAD DETERMINATION AND ALLOCATION PERCENTAGE OF
DIRECT LABOR COSTS METHOD
Identification, Rate Development, and Allocation of Overhead B.01 Identification, Rate Development, and Allocation of Overhead Overhead is the one cost element most frequently misunderstood and absent from public agency costs. This section defines overhead costs and the various methods used to identify, track, and allocate these costs. The Commission believes that overhead is a significant factor and that it is essential that public agencies record and allocate their costs to fairly reflect the total cost of performing public projects. It is not intended that public agencies be required to recover all their overhead costs but that overhead costs reasonably borne by public projects be allocated to these projects.
Overhead includes all costs except:
Labor performed at the site and directly charged to any end costs objective (including other than public projects) including a pro rata share of payroll taxes and related employee benefits, such as workers’ compensation, group insurance, holiday and sick leave, and similar “fringe benefits.” As discussed previously, an end cost objective is a pool, center, or activity established for the accumulation of the direct cost of performing fundamental government services. Labor charged to an end cost objective should be traceable to the finished goods or services performed. Materials, supplies, and subcontracts actually consumed on and directly charged to any end cost objective, including related freight, sales or use tax, and handling/carrying charges if appropriate.
Materials and supplies charged to an end cost objective should be traceable to the finished goods or services provided.
Equipment costs directly charged to any end cost objective. Equipment costs charged to an end cost objective should be traceable to the finished goods or services provided.
Overhead costs represent economic resources that are employed for common or joint purposes benefiting several end cost objectives and are not identifiable to an individual end cost objective. The challenge is to achieve an equitable allocation of overhead costs to these various end cost objectives of the public agency.
Public agencies shall calculate two overhead rates or use the simplified overhead rates noted in Chapter 7:
Unit overhead rate
Government-wide overhead rate
Unit overhead is defined as all costs incurred by an organizational unit, such as a public project unit, department, division or section, which are not directly attributable to any end cost objective whether it be a public project or not. These costs include personnel costs, materials, supplies and subcontracts and equipment costs not directly attributable to any end cost objective. As was discussed in Chapter 4, unit overhead must be developed for public project units and organization units performing public project work.
Government-wide overhead is defined to include all costs of a public agency not associated with organizational units performing services which support all end cost objectives of the government entity.
The unit and government-wide overhead rates must be developed on an annual basis. These rates should be developed prior to the fiscal year and applied to the productive hourly rate as discussed in Chapter 4.
B.02 Unit Overhead
Unit overhead is made up of personnel costs, materials, supplies and subcontracts, equipment usage and facilities costs that are not identified as direct costs. As was stated in Chapter 4, unit overhead rates shall be developed for public project units and any other organizational units whose employees may perform work on public projects.
Cost Components
Components which shall be included in the calculation of unit overhead include, but are not limited to, costs incurred within the organizational unit related to:
Administration
Accounting/finance
Clerical assistance
Facilities
o Rental costs (Depreciation of facilities purchased or constructed by a public agency is not required by the Commission).
o Utilities
o Insurance
Data processing
Direct labor not charged to direct activities
Materials and supplies not charged to direct activities Under-realization of labor and equipment rates
Unit overhead components shall not be included in the government-wide overhead.
Tracking of Unit Overhead
The tracking of overhead costs can be performed in two ways. Overhead can be determined through the utilization of a formal cost accounting system. This system allows for the identification of such costs as salaries and indirect materials and supplies as overhead costs, and records these costs to management overhead codes.
Alternatively, cost-finding studies can be performed. A cost finding study, a less precise method of overhead determination, is usually performed on an annual basis and generally involves taking available financial accounting data and determining the value of overhead pools through various estimation techniques. a. Public Project Unit
As discussed in Chapter 4, a public project unit's personnel shall record and account for a full workday.
This enables the public project unit to track and record time spent on overhead activities and unassigned time on an actual basis. As well, the public project shall record equipment usage costs, subcontractor costs, materials, supplies and subcontracts, and facilities costs to overhead codes when not identifiable to a specific project. Thus, the public project unit accounts for all of its costs, whether they are direct costs or overhead. The public project unit will use the resulting data to develop its unit overhead rate.
b. Organizational Unit Performing Public Project Work
Personnel working for an organizational unit whose primary goals include the performance of routine maintenance work and/or other general government work are not required to account for a full workday. However, these employees must record all hours of work performed on public projects. This organizational unit shall develop a unit overhead rate through an annual cost finding study which distinguishes direct costs for end cost objectives from indirect (overhead) costs.
B.03 Government-Wide Overhead
Government-wide overhead represents costs incurred by the support functions of the governmental entity, which are not associated with an organizational unit performing end cost objectives. As was stated in Chapter 4, government-wide overhead rates shall be determined by each public agency.
Internally Developed Government-Wide Overhead Rate
Public agencies shall utilize an internally developed government-wide overhead rate. The rate methodology shall be documented and an adequate audit trail provided. a. Cost Components
The government-wide overhead rate shall include but not be limited to costs associated with the functions shown below to the extent that they are not included in specific unit overhead rates:
Payroll department
Procurement/purchasing department
Legal function
Central administrative function
Accounting/finance budget function
Data processing
Insurance (whether self-insured or premiums are paid to an agency) Public Relations
Vehicle Pool
The government-wide overhead rate may exclude the costs associated with the legislative and judicial branches of the public agency.
b. Rate Development
The public agency shall develop the government-wide overhead rate of the public agency using direct labor dollars to allocate these government-wide overhead costs in a manner similar to the allocation of unit overhead.
Government-Wide Overhead
Where a government-wide cost allocation plan has been prepared under the auspices of 2 CFR Part 200 or other government-wide rate methodologies, the public agency may utilize the overhead costs or rates developed in lieu of an internally developed government-wide overhead rate, as described in this manual. The Commission recognizes that public agencies may consider these rates imprecise or inappropriate. It is acknowledged that, in developing these rates, some costs are not included because they are considered "not allowable." Thus, the rate may not recover all costs associated with the program. In contrast, an argument could be made that the
rates are calculated to recover the costs of government-wide overhead, which would occur whether or not the specially funded program was undertaken. In this instance, the rate would be considered too high.
In acknowledging these arguments, the Commission wishes to identify the issues but still allow the use of these rates as a reasonable alternative for the calculation of government-wide overhead.
Overhead Allocation
The government-wide overhead rate shall be applied to the appropriate productive hourly rate after the unit overhead has been applied. See Chapter 4 for a more detailed discussion.
THIS PAGE INTENTIONALLY LEFT BLANK
State Controller’s Office
Local Government Programs and Services Division
Local Government Policy Section
www.sco.ca.gov
If you have any questions contact:
[email protected]
For additional copies:
http://www.sco.ca.gov/ard_cuccac.html
Appendix E:
Purchasing Threshold
Matrixes
City of Farmersville Purchasing Threshold Matrixes
Commodities (Materials & Equipment)
Amount Conditions Authorized Buyer Notes
$1 - $10,000 Administrative
Process
Department Head Capital Assets must
be listed on
Approved Capital
Budget
$10,001 - $25,000 Approval Memo from
the Purchasing Agent
Department Head
with Purchasing
Agent Approval
Capital Assets must
be listed on
Approved Capital
Budget
$25,001 - $75,000 Competitive bidding
required: informal
written quotes
Purchasing Agent Capital Assets must
be listed on
Approved Capital
Budget
Over $75,000 Competitive bidding
required: formal RFP
or IFB with approval
from City Council
Purchasing Agent
with Council Approval
Capital Assets must
be listed on
Approved Capital
Budget
Outside Legal Services
Amount Conditions Authorized Buyer Notes
$1 - $50,000 Written approval from
City Attorney
Purchasing Agent PA signs contract
Over $50,000 City Council Mayor signs contract
Settlements & Other Agreements
Amount Conditions Authorized Buyer Notes
$1 - $25,000 City Manager City Manager signs
agreement
Over $25,000 Outside of CSJVRMA
MOC coverage
City Council Mayor signs
agreement
Services (Non-Construction)
Amount Conditions Authorized Buyer Notes
$1 - $10,000 Administrative
Process
Department Head
$10,001 - $25,000 Approval Memo from
the Purchasing Agent
Department Head
with Purchasing
Agent Approval
$25,001 - $50,000 Competitive bidding
required: informal
written quotes
Department Head
with Purchasing
Agent Approval
Three bids preferred
Over $50,000 Competitive bidding
required: formal RFP
or IFB
Purchasing Agent Three bids preferred
& Contract required;
PA signs contract
Over $100,000 Competitive bidding
required: formal RFP
or IFB with approval
from City Council
City Council Three bids preferred
& Contract required;
Mayor signs contract
Services (Construction)
Amount Conditions Authorized Buyer Notes
$1 - $10,000 Administrative
Process
Department Head
$10,001 - $25,000 Approval Memo from
the Purchasing Agent
Department Head
with Purchasing
Agent Approval
$25,001 - $60,000 Competitive bidding
required: informal
written quotes
Department Head
with Purchasing
Agent Approval
Three bids preferred
$60,001 - $200,000 Competitive bidding
required: informal
bids comply with
CUPCCAP
City Council Three bids preferred
Over $200,000 Competitive bidding
required: formal RFP
or IFB with approval
from City Council
City Council Three bids preferred
& Contract required;
Mayor signs contract
All dollar amounts are rounded to the nearest dollar to fit into threshold ranges (i.e. total cost of $10,000.50 would fit into $10,001 - $25,000 range).
Federally Funded Projects / Grants Procurement
Amount Conditions Authorized Buyer Notes
$1 - $10,000
(Micro Purchases)
Administrative
Process
Department Head
$10,001 - $250,000
(Small Purchases)
Competitive bidding
required: informal
written quotes
Purchasing Agent More than one bid
required
Over $250,000 Competitive bidding
required: Formal
process
1. Sealed Bids
(if feasible)
2. Competitive
Proposals (if
feasible)
3. Sole Source
(if only option)
Purchasing Agent More than one bid
required
EXECUTIVE OFFICE OF THE PRESIDENT
OFFICE OF MANAGEMENT AND BUDGET
WASHINGTON, D.C. 20503
OFFICE OF FEDERAL
FINANCIAL MANAGEMENT June 20, 2018
M-18-18
MEMORANDUM FOR CHIEF FINANCIAL OFFICERS AND HEADS OF SMALL EXECUTIVE
AGENCIES
FROM: Tim
Deputy
Soltis
Controller, Office of
~
Federal Financial Management
SUBJECT: Implementing Statutory Changes to the Micro-Purchase and the Simplified Acquisition Thresholds for Financial Assistance
In accordance with recent statutory changes set forth in the National Defense Authorization Acts (NDAA) for Fiscal Years 2017 and 2018, this memorandum raises the threshold for micro-purchases under Federal financial assistance awards to $10,000, and raises the threshold for simplified acquisitions to $250,000 for all recipients. Further, it implements an approval process for certain institutions that want to request micro-purchase thresholds higher than $10,000. Agencies are required to implement these changes in the terms and conditions oftheir awards, and recipients ofexisting Federal financial assistance awards may implement them in their internal controls.
Background
This memorandum applies to all Federal agencies, as defined at 5 U.S.C. § 551(1), that award grants or cooperative agreements. It implements changes to the micro-purchase and simplified acquisition thresholds for financial assistance under the NDAAs for Fiscal Year (FY) 2017 and FY2018. The micropurchase threshold refers to purchases ofsupplies or services using simplified acquisition procedures, not to exceed an established amount pursuant to the Office of Management and Budget (OMB) Govemmentwide Guidance for Grants and Agreements ("Uniform Guidance") at 2 C.F.R. § 200.67 (Micro-purchase). The simplified acquisition threshold refers to purchases of property or services using small purchase methods not to exceed an established amount pursuant to 2 C.F.R. § 200.88 (Simplified acquisition threshold). For Federal financial assistance awards, these purchases are acquired for use by a Federal program. The NDAA for FY2017 increased the micro-purchase threshold from $3,500 to $10,000 for institutions of higher education, or related or affiliated nonprofit entities, nonprofit research organizations or independent research institutes ( 41 U .S.C. § 1908). The NOAA for FY2018 increases the micro-purchase threshold to $10,000 for all recipients and also increases the simplified acquisition threshold from $100,000 to $250,000 for all recipients.
Implementing the NDAA for FY2017
Section 2 l 7(b) ofthe NOAA for FY2017 raises the micro-purchase threshold to$ I 0,000 for procurements under grants and cooperative agreements for institutions ofhigher education, or related or affiliated nonprofit entities, nonprofit research organizations or independent research institutes. 1 1 Pub. L. No. 114-328 (codified at 41 U.S.C. § I902(a)(2)).
The NOAA for FY2017 also establishes an interim uniform process by which these recipients can request and Federal agencies can approve requests to apply a higher micro-purchase threshold. Specifically, the 2017 NOAA allows a threshold above $10,000 if approved by the head ofthe relevant executive agency.
For purposes ofthis approval, the institution's cognizant Federal agency for indirect cost rates will be the relevant executive agency as defined in 2 C.F.R. § 200.19 (Cognizant agency for indirect costs). To receive a higher threshold, the institution must either have "clean single audit findings" (i.e., in accordance with 2 C.F.R. § 200.520 - Criteria for a low-risk auditee), have an acceptable internal institutional risk assessment, or the higher threshold must be consistent with State law for public institutions.
Agencies should reflect this change through policy or terms and conditions in awards for those institutions. The effective date for this change was when the NOAA for FY2017 was signed into law on December 23, 2016. OMB intends to revise the Uniform Guidance to conform with the law. 2 Process for Requesting a Higher Threshold Under the NDAA for FY2017 Requests for approval should be submitted to the institution's cognizant Federal agency for indirect cost rates; however, institutions should contact the agency before sending the request to determine the correct point ofcontact. The cognizant Federal agency will assign review ofthe request to the appropriate office within the agency to determine whether to approve, and will maintain records and justification ofall approvals. The request should include the threshold level being requested and the justification(s) for it based on the criteria above per Section 2 I 7(b) ofthe NOAA for FY2017.
Implementing the NDAA for FY2018
This memorandum also implements provisions of the NOAA for FY 2018, Pub. L. No. 115-91, which became law on December 12, 2017. Specifically, section 806 raised the micro-purchase threshold from $3,500 to $10,000, and section 805 raised the simplified acquisition threshold from $I 00,000 to $250,000. Pursuant to 2 C.F.R. § 200.67 (Micro-purchase) and 2 C.F.R. § 200.88 (Simplified acquisition threshold), these higher thresholds are not effective until implemented in the Federal Acquisition Regulation (FAR) at 48 C.F .R. Subpart 2. 1 (Definitions). 3 In order to allow maximum flexibility for grant recipients in light of the changes to the NOAA for FY2018, OMB is granting an exception allowing recipients to use the higher threshold of$10,000 for micro-purchases and $250,000 for simplified acquisitions in advance ofrevisions to the FAR at 48 C.F.R.
Subpart 2.1 and the Uniform Guidance. Pursuant to 2 C.F.R. § 200.102 (Exceptions), OMB may allow exceptions to the Uniform Guidance when exceptions are not prohibited by statute. The exception takes effect upon the date of issuance ofthis memo. Agencies should apply this exception to all recipients.
Recipients should document any change based on this exception in accordance with 2 C.F.R. § 200.318 (General procurement standards).
Ifyou have any questions regarding this memorandum, please contact Mary Tutman at [email protected] or Gil Tran at Hai_M._ [email protected]. 2 The American Innovation and Competitiveness Act, Pub. L. No. 114-329, § 207{b) {2017) states that the Uniform Guidance shall be revised to conform with the requirements concerning the micro-purchase threshold. 3 Codified at 41 U.S.C. § I902{t).
2
Glossary
Accounting Standards – Generally accepted accounting principles (see GAAP) published by the Governmental Accounting Standards Board (GASB) that guide local and state agencies’ recording and reporting of financial information. The standards establish such guidelines as when transactions are recognized and annual financial report content.
Accounting System - The total set of records and procedures used to record, classify, and report information on the financial status and operations of an entity.
Accrual Accounting Method - An accounting method that recognizes economic events regardless of when cash transactions occur.
Ad Valorem Tax – A tax assessed based on the dollar value of an item or activity. Typical examples are property and sales taxes. Ad valorem taxes contrast with per-unit taxes, such as alcoholic beverage and cigarette taxes, which are assessed at a fixed dollar per unit purchased.
Adopted Budget - The budget document formally approved by the City Council.
Adverse Opinion – A finding issued by an independent auditor as part of the annual single audit requirement. This opinion finds that the auditee is not in compliance with all material aspects.
Allocated Costs – A method for allocating overhead time and other expenses to activities that provide direct services.
Allotments - Management allocation of appropriated funds subject to legal constraints.
Appropriation – A legal authorization granted by the City Council to make expenditures and to incur obligations for specific purposes. An appropriation is usually for a fixed amount and time limited and must be expended before the deadline.
Appropriation Spending Limitation (Gann Limit) – Article XIII B of the California Constitution establishes a spending limitation on government agencies within California. The spending limit is a mandated calculation of how much the City is allowed to expend in one fiscal year. The amounts of appropriations subject to the limit are budgeted proceeds of taxes. The total of these budgeted revenues cannot exceed the total appropriations limit. Annually, local governments may increase the appropriate limit by a factor comprised of the change in population combined with the California inflation rate as determined by the State Finance Department.
Arbitrage – A technique used to take advantage or price differences in separate markets. This is accomplished by either selling debt instruments at a low interest rate and investing the proceeds at a higher rate, or by purchasing securities, negotiable instruments or currencies in one market for immediate sale in another market at a better price.
Assessed Valuation - A valuation set upon real estate or other property by the County Assessor and the State as a basis for levying taxes.
Assessment District – Not a separate governmental entity, but rather a defined area of land which will be benefited by the acquisition, construction or maintenance of a public improvement.
Authorized Positions - Positions approved by the City Council which may or may not have funding (see Budgeted Positions).
Asset Forfeiture Fund - This fund accounts for the proceeds from sale of assets seized primarily from illegal narcotics activities. Asset Forfeiture funds are used for law enforcement purposes.
Audit - an official inspection of an individual's or organization's accounts, typically by an independent body.
Balanced Budget - (particularly that of a government) is a budget in which revenues are equal to expenditures. Thus, neither a budget deficit nor a budget surplus exists (the accounts "balance"). More generally, it is a budget that has no budget deficit, but could possibly have a budget surplus.
Base Budget – Those resources are necessary to meet an established and existing service level.
Basis of Budgeting - Basis of budgeting refers to the method used for recognizing revenues and expenditures in budget.
The City uses the modified accrual basis of accounting for budgetary purposes, which is in compliance with Generally Accepted Accounting Principles.
Beginning Fund Balance – The available fund balance in a fund from the end of the prior year for use in the following year.
Benefit Assessment – Charges levied on parcels to pay for public improvements or services provided within a predetermined district or area according to the benefit the parcel receives from the improvement or services.
Benefit Assessment Act of 1982 – The 1982 Act lets cities, counties and special districts finance a variety of improvements. The Act requires majority voter approval if the proposed assessment area has 12 or more registered voters. If less than 12, the owners of at least 60% of the land in the assessment area must give written consent to the assessment.
Bond - A City may raise capital funds by issuing a written promise to pay a specified sum of money, called the face value or principal amount; at a specified date or dates in the future, together with the periodic interest at a specified rate.
Bond Interest and Redemption - Payment of interest and principal on an obligation resulting from the issuance of bonds.
Budget - A planning and controlling document for financial operation with estimates of proposed expenditures and revenues for a given period, usually one year. A plan or action expressed in figures.
Budget Amendment – A request for an increase or decrease in an existing service level (over and above the base budget).
Budget Calendar - The schedule of key dates or milestones that a government follows in the preparation and adoption of the budget.
Budget Document - The official written statement prepared by the budget office and supporting staff.
Budget Message - A general written description summarizing the proposed budget. The budget message explains principal budget issues against the background of financial experience in recent years and presents recommendations made by the City Manager.
Budget Modification – A change of expenditure levels and corresponding resources needed to accomplish an existing service level or unanticipated service. All budget modifications are reflected in the current year’s budget and are approved by the City Council and/or City Manager as authorized by the Annual Budget Adoption Resolution.
Budgeted Positions - The number of full-time equivalent positions to be funded in the budget. Example: Funding of two half-time positions would equal one full-time equivalent position.
Business Improvement District - A public-private partnership in which businesses in a defined area pay special taxes, fees and/or assessments to fund public facility improvements and programs in the area.
Business License Tax - A type of excise tax imposed on businesses for the privilege of conducting business within the city. The tax is most commonly based on gross receipts or levied at a flat rate.
California State Board of Equalization (BOE) – California state agency responsible for the collection and administration of the state’s sales and use, alcohol, tobacco, and other taxes. In addition, the BOE determines the assessed value of certain properties and oversees property tax assessment practices of county assessors.
California State Controller – The Controller is the Chief Fiscal Officer of the state and is elected every four years. The Controller is responsible to: account and disburse all state funds; determine the legality and accuracy of claims against the state; pay the state’s bills; audit and process all personnel and state payroll transactions; audit various state and local government programs; administer the Unclaimed Property Law; and inform the public of financial transactions of city, county and district governments.
Capital Improvement Plan - A plan for capital expenditures and the means of financing them, to be incurred each year over a fixed period of years, to meet capital needs arising from long-term work program. Included are expenditures made for land, building, permanent public works projects, major reconstruction or renovation of structures, and major landscaping or park improvements.
Capital Outlay - Expenditures for the acquisition of capital assets.
Carry-Over Balance - Balance of funds brought forward from prior years.
Cash Basis Accounting - An accounting method that recognizes revenues and expenses at the time physical cash is actually received or paid out.
Central San Joaquin Valley Risk Management Authority (CSJVMRA) – The Central San Joaquin Valley Risk Management Authority is a joint powers authority of 54 cities, providing quality, cost-effective risk financing and risk control services. The City of Reedley is a member and participates in the self-funded programs for general liability, employment practices liability, property damage, and workers’ compensation coverage.
Certificates of Participation (C.O.P.) – Debt instrument, commonly called C.O.P., that provides long-term financing through a lease (with an option to purchase) or through an installment agreement.
Charter City – Charter cities have authority over “municipal affairs,” trumping state law governing the same topic. In contrast, general law city is a city that has not adopted a charter and is therefore bound by the state’s general laws, even with respect to municipal affairs. The City of Farmersville is a general law city.
Congestion Mitigation and Air Quality Improvement Program (CMAQ) - Jointly administered by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA), the CMAQ program was reauthorized under the Transportation Equity Act for the 21st Century (TEA-21) in 1998. The CMAQ program was implemented to support surface transportation projects and other related efforts that contribute air quality improvements and provide congestion relief.
Community Development Block Grant (CDBG) - The Community Development Block Grant is a federal program for the development of housing and community projects within a pre-approved functional area. Funds are awarded to agencies on an annual basis to carry out these activities
Comprehensive Annual Financial Report (CAFR) - A set of government financial statements comprising the financial report of a state, municipal or other governmental entity that complies with the accounting requirements promulgated by the Governmental Accounting Standards Board (GASB).
Contingency - Funds appropriated by the City Council for unforeseen needs.
Consultants - Fees paid to outside individuals who provide advice or services.
Citizens Option for Public Safety (COPS) – A state subvention for local law enforcement initiated in 1996.
Community Facilities District (CFD) – See Mello-Roos Community Facilities District.
Construction / Development Tax – Excise tax imposed on the privilege or activity of development and/or the availability or use of municipal services.
Consumer Price Index (CPI) – A statistical description of price levels provided by the U.S. Department of Labor. The change in this index from year to year is used to measure the cost of living and economic inflation.
County Assessor – An elected official whose main duty is to set values on real property for the purpose of taxation within the county. The Assessor is responsible for the creation and maintenance of assessor parcels from final
subdivisions, parcel maps, lot line adjustments, record of survey, deeds and miscellaneous documents.
County Auditor-Controller – The chief accounting officer of the county established to provide various accounting and property tax administration services to the county and other local governments within the county. The Auditor Controller is responsible for budget control, disbursements and receipts, financial reporting, and for audits of certain agencies within the county. Auditor-Controllers are nonpartisan elected officials serving four-year terms, except in four counties with appointed officers: San Francisco, Santa Clara, Los Angeles, and San Diego.
County Treasurer-Tax Collector – Administers the billing, collection, and reporting of property tax revenues and conducts Tax Defaulted Property Sales for real property tax delinquencies remaining after five years. Treasurer-Tax Collectors are nonpartisan elected officials serving four-year terms except in three counties with appointed officers:
Los Angeles, Sacramento, and Santa Clara.
Countywide/Statewide Pools – A system used to allocate local sales and use tax payments that cannot be identified with a specific place of sale or use in California. Local tax reported to the pools is distributed to the local jurisdictions in proportion to taxable sales.
Current Refunding – When restructuring or retiring outstanding bonds, if bonds are paid off within 90 days of depositing either cash on hand or refunding bond proceeds, the refunding is a “current refunding”.
Debt Financing – Issuance of bonds and other debt instruments to finance municipal improvements and services.
Debt Instrument – Written pledge to repay debt such as bills, notes and bonds.
Debt Service – Payment of principal and interest on long-term indebtedness such as bond maturities, loans and revenue anticipation notes.
Defeasance - A provision that voids a bond or loan when the borrower sets aside cash or bonds sufficient to service the borrower's debt.
Deficit - The amount by which government spending exceeds government revenues. (Also see:
structural deficit)
Department - An organizational unit comprised of divisions or programs. It is possible for a department to be comprised of only one division.
Department Activity - A unit of budgetary accountability and control that encompasses specific and distinguishable lines of work performance for the purpose of accomplishing a function for which the City is responsible.
Description - Contains a list of the typical activities of programs.
Development Impact Fees (DIF) – Fees placed on the development of land or conditions required for the approval of a development project such as the dedication of certain lands to specific public uses. The fees are typically justified as an offset to the future impact that development will have on existing infrastructure.
Discretionary Revenue - Money that the City Council has the authority to allocate for any purpose. Often refers to the General Fund, as opposed to Special Funds.
Disclaimer of Opinion – A finding issued by an independent auditor as part of the annual single audit requirement. This means that the scope of the auditor’s work is insufficient to express any opinion on the auditee’s compliance.
D.I.V.C.A. – The Digital Infrastructure and Video Competition Act of 2006 effectively replaced locally issued franchise agreements for video service with a system of state-issued franchises subject to certain limited locally imposed conditions and requiring franchise fees to be paid to local agencies where services are provided.
Division - A functional grouping of related activities within a department. There are usually several activities within a division.
Earmarked Funds – Funds that have been tagged or “earmarked” for a specific purpose.
Employee (Fringe) Benefits - The cost to the City for contribution to employee retirement, social security, health and
workers' compensation programs.
Encumbrance - Funds not yet expended but which are delegated or set aside in anticipation of an expenditure in the form of a purchase order, contract, or other commitment, chargeable to an appropriation. These funds cease to be an encumbrance when paid.
Enterprise Fund - Established to finance and account for the operation and maintenance of facilities and services which are predominately self-supporting by user charges.
ERAF: Educational Revenue Augmentation Fund – Accounts established by the state Legislature to receive shifts of property tax revenues from cities, counties, special districts and redevelopment agencies. The additional ERAF property tax revenues to schools enable the state general fund to reduce support from the state general fund.
Excise Tax – Tax placed on a person for a voluntary act, making the tax avoidable. Includes sales and use tax, business license tax, transient occupancy tax, utility users’ tax, etc. Phrase “excise tax” is most commonly used to refer to a parcel tax.
Exemption – The exclusion from the tax base of certain types of transactions or objects. For example, federally owned land is exempted from property tax.
Expenditure – The actual payment for goods and services. A decrease in payee resources.
Fair Market Value - The value of a piece of real estate in the open market. Used to determine the assessed value of property for taxing purposes.
Fee – A charge to the consumer for the cost of providing a particular service. California government fees may not exceed the estimated reasonable cost of providing the service of facility for which the fee is charged, plus overhead.
Fiduciary Fund - Fiduciary funds are used to report assets held in a trustee or agency capacity for others and therefore cannot be used to support the government's own programs. Resources held in trust for the benefit of the agency's own programs.
Fines, Forfeitures and Penalties – Revenues received and/or bail monies forfeited upon conviction of a misdemeanor or municipal infraction.
Fiscal Year – The period designated by the City for the beginning and ending of financial transactions. The City of Reedley’s fiscal years begin on July 1 and end on June 30 of the following year.
Fiscal Year End (FYE) – This term means as of June 30th (end of the fiscal year).
Fiscal Year to Date (FYTD) – This term means as of a specific period, year-to-date, regarding the fiscal year ending June 30th.
Fixed Asset – A tangible item of a long-term character such as land, buildings, furniture, and other equipment with a unit cost in excess of $10,000.
Franchises – Fee paid to a municipality from a franchisee for “rental” or “toll” for the use of city streets and rights-ofway.
Fringe Benefits - Benefits to City employees, in addition to salaries, paid by the City. These benefits include social security, pensions, workers' compensation, unemployment compensation, life and health insurance.
Full Time Equivalency (FTE) - One employee position totals one full year of service or approximately 2080 hours a year. FTE are allocated to Department Expenditures based upon the work within that unit. As an example, the City Clerk Department may have 50% with the remaining 50% expensed out to the Administration Department, thus equaling 1 FTE Position.
Functional Revenue – Revenues that can be associated with and allocated to one or more expenditure function and which meet one of the following criteria: (1) the revenue is generated from direct services, such as revenues from fees or charges; (2) the revenue is associated with specific service by external requirements, such as grant conditions, bond sale agreements, or statutory or charter requirements.
Full Faith and Credit – Pledge by issuer of general obligation bonds to bondholders that issuer guarantees “all available funds” be used to pay bondholders should the project go into default.
Full-Service City – A city that is financially responsible for the major categories of municipal services including police, fire, planning, parks, water, sewer and solid waste services.
Fund – Accounting entity with a set of self-balancing revenue and expenditure accounts used to record the financial affairs of a governmental organization.
Fund Accounting - A accounting system used by non-profit organizations and governments. In this system, a fund is a self-balancing set of accounts, segregated for specific purposes in accordance with laws and regulations or special restrictions and limitations.
Fund Balance – Difference between the assets (revenues and other resources) and liabilities (expenditures incurred or committed to) of a particular fund.
Funding Source – Identifies fund(s) that will provide resources for City expenditures.
General Fund - The primary fund of the City used to account for all revenues and expenditures of the City not legally restricted as to use.
General Law City – A city that has not adopted a charter and is therefore bound by the state’s general laws, even with respect to municipal affairs. In contrast, charter cities have authority over “municipal affairs”, trumping state law governing the same topic. The City of Farmersville is a general law city.
General Obligation Bond – Bonds issued through a governmental entity which have the legal authority to levy a tax on real and personal property located within the governmental boundaries at any rate necessary to collect enough money each year to pay for principal and interest due.
General Plan – The General Plan is a long-range planning document that provides the City a framework for action and the direction in which to focus that action. General Plan Elements are areas in which the City has elected to administer and manage the delivery of services to its community.
General Revenue – Those revenues that cannot be associated with a specific expenditure, such as property taxes (other than voter approved indebtedness), sales tax, and business license tax.
General Tax – A tax imposed for general governmental purposes, the proceeds of which are deposited into the general fund. A majority vote of the electorate is required to impose, extend or increase any general tax.
Generally Accepted Accounting Principles (GAAP) - A combination of authoritative standards (set by policy boards) and simply the commonly accepted ways of recording and reporting accounting information.
Governmental Accounting Standards Board (GASB) – The body that sets accounting standards for governmental entities at the state and local levels.
Governmental Funds - A government fund is a grouping used in accounting for tax-supported governmental activities.
Its opposite is a proprietary fund, which accounts for business-like activities conducted by the government. There are several government fund types, each of which maintains a balance sheet.
Grant - A contribution from one government unit to another, usually made for a specific purpose and time period.
Highway Safety Improvement Program (HSIP) – The HSIP went into effect on October 1, 2012 and is a Federal-Aid program that focuses on significant reduction in traffic fatalities and serious injuries on all public roads. The HSIP requires a data-driven, strategic approach to improving highway safety on all public roads.
Homeowner’s Property Tax Relief – Revenue from the state to offset city loss of property tax for state-imposed $7,000 per dwelling homeowner exemption.
Improvement Bond Act of 1915 – Act which lets cities, counties and “public districts” issue assessment bonds and bond anticipation notes. The 1915 Act does not authorize assessments.
Inter-Fund Transfers - Monies appropriated from one fund to another fund. This is done to reimburse the fund for expenses or to finance the operation of the other fund.
Intermodal Surface Transportation Efficiency Act (ISTEA) – Adopted as part of the Moving Ahead for Progress in the 21st Century Act in 2012, ISTEA is a Federal-aid program for transportation planning and the funding of non-motorized commuter trails.
Investment Earnings – Revenue earned from the investment of idle public funds.
Joint Powers Authority (JPA) – The Joint Exercise of Powers Act authorizes local public agencies to exercise common powers and to form joint powers authorities (“JPAs”) for purpose of jointly receiving or providing specific services.
Local Agency Investment Fund (LAIF) – A special fund in the state treasury. Local governments may deposit in this fund through the state treasurer for investment purposes.
Landscaping and Lighting Act of 1972 – The 1972 Act lets cities, counties and special districts levy assessments for land purchase and the construction, operation, and maintenance of parks, landscaping, lighting, traffic signals and graffiti abatement.
Lease Revenue Bonds – Bonds similar to certificates of participation and used for the same types of projects with main exceptions that: (1) lessor must be either a governmental entity with the power to issue revenue bonds or a nonprofit corporation that issues bonds on behalf of a political subdivision; and (2) the bonds constitute a direct debt of the lessor.
Levy – (Verb) To impose taxes, special assessments, or service charges for the support of governmental activities; (noun) the total amount of taxes, and/or special assessments and/or service charges imposed by a governmental agency.
Licenses and Permits – Charge designed to reimburse city for costs of regulating activities being licensed, such as licensing of animals, bicycles, yard sale permits, etc.
Lien – A claim on assets, especially property, for the payment of taxes or utility service charges.
Limited Obligation Bonds – Similar to general obligation bonds except that security for the issuance is limited exactly to the revenues pledged in the bond statement and not to the full faith and credit of the city.
Line-Item Budgeting – The most widely used of all budgeting systems. A line item budget lists each of the revenue sources and expenditures.
Liquidity – The ability to convert a security into cash promptly with minimum risk of principal.
Local Agency Investment Fund (LAIF) – A special fund in the state treasury. Local governments may deposit in this fund through the state treasurer for investment purposes.
Major Funds - Funds whose revenues, expenditures/expenses, assets, or liabilities (excluding extraordinary items) are at least 10 percent of corresponding totals for all governmental or enterprise funds and at least 5 percent of the aggregate amount for all governmental and enterprise funds.
Maintenance of Effort (MOE) – A requirement, often as a condition of an intergovernmental subvention or supplemental tax, to maintain a level of spending at a certain level. Maintenance of Effort requirements are intended to prevent or limit the use of the additional revenues to supplant existing revenues such that the new revenues result in an increase in the level of program spending and services.
Mandate (Mandated Services) – A legal requirement, usually imposed by State or Federal law. This term is used to refer to City services, which are provided to comply with State or Federal laws.
Materials, Supplies and Services - Expenditures for materials, supplies and related services which are ordinarily consumed within a fiscal year and which are not included in department inventories.
Measure P – A tax imposed on the total retail price of any tangible personal property purchased within the City at a rate of ½ of 1%. The Measure was passed by nearly 61% of the voting residents of Farmersville on November 7, 2017.
There is no sunset clause.
Measure U – A tax imposed on the total retail price of any tangible personal property purchased within the City at a rate of ½ of 1%. The Measure was passed by nearly 65% of the voting residents of Farmersville on November 2, 2004.
There is no sunset clause.
Mello-Roos Community Facilities District – A destine entity of government for the purpose of imposing and collecting the Mello-Roos Community Facilities Tax. The governing body and the boundaries of the district may be the same as for the City.
Mello-Roos Community Facilities District Tax – Special non ad valorem tax imposed to finance public capital facilities and services in connection with new development.
Mello-Roos Bonds – Bonds allowing cities, counties, school districts and special districts to finance certain public capital facilities and services, especially in developing areas and areas undergoing rehabilitation. Property owners in the Mello-Roos district pay an annual special tax which is included on the property tax bill.
Modified Accrual Accounting Method - An accounting method commonly used by government agencies that combines accrual-basis accounting with cash-basis accounting. Modified accrual accounting recognizes revenues when they become available and measurable and, with a few exceptions, recognizes expenditures when liabilities are incurred.
Motor Vehicle Fuel Tax –A per gallon tax on fuel used to propel a motor vehicle or aircraft. Use of tax is limited to research, planning, construction, improvement, maintenance and operation of public stress and highways or public mass transit guideways. Also called Highway Users Tax, Gas Tax and Motor Vehicle Fuel Tax.
Motor Vehicle License Fee (VLF) – VLF is fee for privilege of operating a vehicle on public streets. VLF is levied annually at 2% of the market value of motor vehicles and is imposed by the state “in lieu” of local property taxes. VLF is also called Motor Vehicle in-Lieu Tax.
Municipal Code - A book that contains City Council approved ordinances presently in effect. The Code defines City policies in various categories.
Nexus – In general, a minimum threshold of connection necessary within a taxing jurisdiction to allow taxing authority over out-of-state individuals or businesses. Requirement of Government Code Sections 66000 et seq. that there be a reasonable connection (“nexus”) between required development impact fees and the development project in question.
Objectives - Identifies the desired results of the activities of a program.
Operating Budget – A programmatic, financial, and organizational plan for furthering the goals of the City Council through departments of the City, which does not include capital improvement projects.
Operating Expenses – Expenses incurred as a result of day-to-day operations.
Ordinance - A formal legislative enactment by the City Council. It has the full force and effect of law within the City boundaries unless it conflicts with any higher form of law, such as a State statute or constitutional provision. An ordinance has higher legal standing than a resolution. A law set forth by a government authority, specifically, a municipal regulation.
Other Post-Employment Benefits (OPEB) – A pension is a form of “post-employment benefit” that an employee receives after their service to the agency ends. Other forms of such benefits can include health insurance and other health-related benefits provided to former employees.
Parcel Tax – Special non ad valorem tax on parcels of property generally based on either a flat per- parcel rate or a variable rate depending on the size, use and/or number of units on the parcel.
Pay as You Use – Concept that debt financing enables the public entity to spread the cost of a capital project over time, as the project is being utilized.
Pay as You Go – Concept of paying for capital projects when the initial cost is incurred, rather than over time using debt financing.
Performance Budget – Same as a program budget, except that an additional component – performance – is included to tie expenditures for each program to specific goals established for that program.
Performance Indicator – A performance indicator is a measurement designed by a reasoning process to determine whether a service objective has been met. It measures the effectiveness of achieving the objective or how well the objective has been accomplished.
PERS (CalPERS) - Public Employees Retirement System. A pension plan administered by the State of California for government agencies.
Personnel Expenditures – Salaries, wages and fringe benefits paid to and on behalf of employees.
Police and Fire Special Tax – Special tax on parcels of property in support of police and/or fire protection services.
Portfolio – The collection of securities held by an individual or institution.
Possessory Interest – Taxable private ownership of interests in tax-exempt public property.
Prevailing Wage – The basic hourly rate paid on public works projects to a majority of workers engaged in a particular craft, classification, or type of work within the locality and in the nearest labor market area. Prevailing wage laws require all bidders to use the same wage rates when bidding on a public works project.
Program Budget – A program budget displays a series of ‘mini-budgets’ which show the cost of each activity that city departments perform.
Program Revenues – Revenues received by a department as a result of the services or operations of that department (such as user fees), which are used to finance the related services or programs. Program Revenue is not discretionary (general-purpose) revenue.
Property Related Fee – A levy imposed on a parcel or upon a person as an incident of property ownership for propertyrelated service.
Property Tax – California State Constitution Article XIII A provide that the combined maximum property tax rate on any given property equal 1% of its assessed value unless an additional amount has been approved by voters for special taxes or general obligation bonds. The County assesses properties, bills and collects these property taxes. The County remits the City’s share.
Property Tax In Lieu of VLF – Property tax shares and revenues allocated to cities and counties beginning in FY04-05 as compensation for Vehicle License Fee (VLF) revenues previously allocated to cities and counties by the State.
Proposed Budget - The working document for the fiscal year under discussion.
Proposition 1A (2004) – Voter approved state constitutional amendment protecting most major city county and special district revenues from reduction or shifting by the state Legislature.
Proposition 1A (2006) – Voter approved constitutional amendment protecting the local allocation of state transportation sales tax revenues under Proposition 42 from reduction or shifting by the state Legislature.
Proposition 4 (1979) – Also called the Gann Initiative, this initiative, now Article XIIIB of the State Constitution, was drafted to be a companion measure to Proposition 13, Article XIIIA of the Constitution. Article XIIIB limits growth in the government spending to changes in population and inflation.
Proposition 8 (1978) – As amendment to Proposition 13, passed in November 1978 to allow Assessors to recognize declines in value for property tax purposes. Revenue & Taxation Code Section 51 requires the Assessor to annually enroll either a property’s Proposition 13 base year value factored for inflation, or its market value as of January 1st, whichever is less.
Proposition 13 (1978) – Article XIIIA of the California Constitution, commonly known as Proposition 13, which limits the maximum annual increase of any ad valorem tax on real property to 1% of the full cash value of such property.
Proposition 42 (2002) – Voter approved measure that directs the Legislature to allocate revenues derived from the
taxable sales of gasoline to certain transportation programs including to cities and counties.
Proposition 111 (1994) – Voter approved measure that increased the state Motor Vehicle Fuel Tax by $0.09 per gallon and made certain adjustments to the spending limits under Proposition 4 (1979).
Proposition 172 (1993) – A 1993 measure which places a one-half cent sales tax for local public safety in the constitution effective January 1, 1994. The tax is imposed by the state and distributed to cities and counties.
Proposition 218 (1996) – A voter approved state Constitutional amendment, self-titled “Right to Vote on Taxes Act” expanded restrictions on local government revenue-raising, allowing the voters to repeal or reduce taxes, assessments, fees, and charges through the initiative process; reiterating the requirement for voter approval for both “special taxes” and “general taxes”, and imposing procedural and substantive limitations on assessments of real property and on certain types of fees.
Proprietary Funds - in governmental accounting, is a business-like fund of a state or local government. Examples of proprietary funds include enterprise funds and internal service funds. Enterprise funds provide goods or services to the general public for a fee.
Principal – “Face” or “par value” of an instrument. It does not include accrued interest.
Purchase Order - Authorizes the delivery of specific goods or services, and incurrence of debt for them.
Purpose/Goal - This element explains the need for the activity and the reason for its existence.
Qualified Opinion – A finding issued by an independent auditor as part of the annual single audit requirement. This opinion finds that the auditee is mostly in compliance with all material aspects. Some instance of material noncompliance was noted during the scope of the audit.
Rating – The designation used by investors’ services to rate the quality of a security’s creditworthiness.
Rating Agencies – Firms that evaluate the likelihood bonds or debts will be repaid by assigning rates to those bonds or debts. A bond rating is often the single most important factor affecting the interest cost on bonds. There are three major rating agencies for municipal bonds: Moody’s Investors Service, Standard & Poor’s, and Fitch Ratings.
Real Property – Land and permanently attached improvements.
Real Property Transfer Tax – Tax imposed on the transfer of ownership in real estate. Typically imposed instead of a Documentary Transfer Tax.
Realignment – Actions taken by the State of California in 1991 and 2011 to restructure the state-county fiscal relationship by making certain health, social service, criminal justice, and mental health service programs county responsibilities, and providing some funding to help pay for the new responsibilities.
Regional Surface Transportation Program (RSTP) – The RSTP was established by California State Statute utilizing Surface Transportation Program Funds that are identified in Section 133 of Title 23 of the United States Code. Funds are typically eligible for construction, reconstruction, rehabilitation, resurfacing, restoration, and operational improvement on Federal-aid highways.
Reimbursement for State Mandated Costs – Article XIIIB, Section 6 of the California Constitution which requires the state to reimburse local agencies for the cost of the state-imposed programs. Process is commonly called “SB90” after its original 1972 legislation.
Regulatory Fee – A charge imposed on a regulated action to pay for the cost of public programs or facilities necessary to regulate a business or other activity or mitigate the impacts of the fee payer on the community. A regulatory fee does not include a charge on a property or a property owner solely due to property ownership.
Repairs and Maintenance - Expenditures for repairs and maintenance of all equipment and supplies, buildings, structures and grounds.
Reserve - An account used to earmark a portion of the fund balance as legally segregated for a specific use.
Resolution - A special or temporary order of the City Council that requires less legal formality than an ordinance in terms of public notice and the number of public readings prior to approval.
Restricted Use Funds – Funds designated for use for a specific purpose.
Revenue – Annual income received by the city.
Revenue Bonds – Bonds issued to acquire, construct or expand public projects for which fees or admissions are charged. Bonds are repaid solely from the income generated by use of that project.
Salary Savings - That percentage or dollar amount of salaries which can be expected to be unspent during the fiscal year due to vacancies and employees receiving less than the top-step pay of the classification.
Sales Tax – A tax imposed on the total retail price of any tangible personal property. The City’s general fund receives .95% percent of the 8.75% of taxes assessed on retail sales or leases of tangible personal property in the City.
SB1977 – 1992 bill (Government Code, Section 54945.6 as amended) requiring local officials to mail notice of new and increased benefit assessments and to hold public hearings prior to imposing benefit assessments.
SB90 – Reimbursement process for state mandated costs, named after its original 1972 legislation.
Secured Property – As the property tax is guaranteed by placing a lien on the real property, secured property is that real property in which the value of the lien on the real property and personal property located thereon is sufficient to assure payment of the tax.
Secured Property Taxes - Taxes levied on secured property in the City.
Secured Roll – That property tax list containing all assessed property secured by land subject to local taxation.
Securities – Investment instruments such as bonds, stocks and other instruments of indebtedness or equity.
Service Charges – Charges imposed to support services to individuals or to cover the cost of providing such services.
The fees charged are limited to the cost of providing the service or regulation required (plus overhead).
Service Level – Indicates a project’s effect on existing levels of service provision or identifies a new service to be provided to the public.
Short-Term Financing Methods – Techniques used for many purposes, such as meeting anticipated cash flow deficits, interim financing of a project, and project implementation. Using these techniques involves issuance of short-term notes. Voter approval is not required.
Single Audit - An annual examination by an independent auditor of a governmental agency’s financial records, financial statements, federal award transactions and expenditures, general management of its operations, internal control systems, and federal assistance. The final independent audit report must be presented in conformity with Generally Accepted Accounting Principles. It must include a report on the status of internal controls relative to the financial statements and major programs. The auditor must also issue an opinion on the degree to which the recipient has complied with laws, regulations, and the terms and conditions of the federal assistance awards. If the Single Audit produced audit findings, the auditor must prepare a Schedule of Findings and Questioned Costs. See Unqualified Opinion, Qualified Opinion, Adverse Opinion and Disclaimer of Opinion.
Special Assessment Fund - A fund used to account for the financing of public improvements or services deemed to benefit primarily the properties against which special assessments are levied.
Special District - Independent unit of local government generally organized to perform a single function.
Specialized Services - Services that are not otherwise categorized, such as title searches, police work for private parties, consultant fees, library materials, fringe benefits and loans.
Special Tax – A tax that is collected and earmarked for a special purpose and deposited into a separate account. A two-thirds vote of the electorate is required to impose, extend or increase any special tax.
Street Lighting Act of 1919 – Act authorizing cities to fund the maintenance and operation of street lighting.
Structural Deficit - The amount by which a government’s spending is more than it receives in taxes in a particular period, whether the economy is performing well or not. Structural deficit issues can only be addressed by explicit and direct government policies: reducing spending, increasing the tax base, and/or increasing tax rates. It can be described as more "chronic" or long-term in nature hence needing government action to remove it.
Subvention – Subsidy or financial support received from county, state or federal government. The state and county currently levy certain taxes that are “subvented” to cities, including motor vehicle license fees, state mandated costs and motor vehicle fuel tax.
Sunset Clause - In public policy, a sunset provision or clause is a measure within a statute, regulation or other law that provides that the law shall cease to have effect after a specific date, unless further legislative action is taken to extend the law.
Supplemental Property Tax – In the event a property changes ownership, the county collects a supplemental property tax assessment in the current tax year by determining a supplemental value. In future tax periods, the property carries the full cash value.
Tangible Personal Property – Movable property.
Tax – Compulsory charge levied by a government for the purpose of financing services performed for the common benefit.
Tax Allocation Bonds – Bonds that were issued by redevelopment agencies to revitalize blighted and economically depressed areas of the community and to promote economic growth.
Tax and Revenue Anticipation Notes (TRANs) – TRANs are short-term borrowings by a public entity to meet cash flow needs in the general fund and other unrestricted funds of a public entity. TRANs are issued before expected receipt of taxes and other revenues during the same fiscal year.
Tax Base – The objects or transactions to which a tax is applied (e.g. parcels of property, retail sales, etc.). State law or local ordinances define the tax base and the objects or transactions exempted from taxation.
Tax Rate - The amount of tax applied to the tax base. The rate may be flat, incremental or a percentage of the tax base, or any other reasonable method.
Transactions and Use Tax – Also known as an “add-on local sales tax”, a tax imposed on the total retail price of any tangible personal property and the use or storage of such property when sales tax is not paid.
Transient Occupancy Tax (TOT) - Tax levied by cities on persons staying 30 days or less in a room(s) in a hotel, inn, motel, tourist home, non-membership campground or other lodging facility. Also called Transient Lodging Tax or Hotel Tax. The City of Reedley’s TOT rate is 8% is applicable only at the Edgewater Motel.
Teeter Plan – Enacted in 1949, an alternative method for allocating delinquent property tax revenues, authorized by Revenue and Taxation Code section 401, in which the County Auditor allocates property tax revenues based on the total amount of property taxes billed, but not yet collected. The county government then collects and keeps the delinquency, penalty and interest payments.
Triple Flip – A mechanism used to repay state fiscal recovery bonds pursuant to Proposition 57 of 2004. Under the Triple Flip, the local sales and use tax rate is reduced from 1.00% to .75% with the 0.25% diverted to repay state fiscal recovery bonds. Cities and counties are reimbursed for the lost revenue from a shift of property tax revenue.
Tulare County Association of Governments (TCAG) – This body was formed by a joint powers agreement in 1971. The eight incorporated cities and the County of Tulare executed the agreement. The purpose of this formation was to assist local jurisdictions in obtaining federal assistance by providing advice, counsel, and professional direction; review and coordinate applications for programs utilizing federal funding; and provide a clearinghouse for the coordination and review of all state funded projects. In 1982, TCAG was designated the Metropolitan Planning Organization for Tulare County. This, along with responsibilities as Tulare County’s Council of Governments, Transportation Authority, and the Regional Transportation Planning Agency, provides TCAG with a unique opportunity to represent the region in many different forums.
Unqualified Opinion – A finding issued by an independent auditor as part of the annual single audit requirement. This opinion finds that the auditee is in compliance with all material aspects.
Unsecured Property – As the property tax is guaranteed by placing a lien on the real property, unsecured property is that real property in which the value of the lien is not sufficient to assure payment of the property tax.
Use Tax – A tax imposed on the use or storage of the tangible personal property when sales tax is not paid.
User Fee – Fees charged for the use of a public service or program such as for recreation programs or public document retrieval. User fees for property-related services are referred to as property-related fees.
Utility Connection Fee – Utility connection fees or capacity fees are imposed based on a voluntary decision to connect to a utility system or to acquire the right to use additional capacity.
Utility Rate – A category of user fee paid by the user of utility services.
Utility Users Tax (UUT) – Tax imposed on the consumer (residential and/or commercial) of any combination of electric, gas, cable, television, water, and telephone services. The City of Reedley does not have any Utility Users Tax.
VLF – Property Tax Swap – The trade of most city and county Vehicle License Fee revenue for additional property tax share and revenue.
Voter Approved Property Tax for Indebtedness – Includes ad valorem property taxes levied in addition to the 1 percent rate for voter approved debt, approved prior to July 1, 1978 or after July 1, 1986.
Williamson Act and Open Space Subvention – State subvention to foster preservation of open-space by lowering cost of property tax.
WWTP – Wastewater Treatment Plant.
Year-End – This term means as of June 30th (end of the fiscal year).
Yield – The total amount of revenue a government expects to receive from a tax, determined by multiplying the tax rate by the tax base. Also, the annual rate of return on an investment, expressed as a percentage of the investment.
Zero-Based Budget – Zero-based budgeting is a system that requires all departments to defend their programs and justify their continuation each year. The department(s) must show the various levels of service that could be provided with different levels of funding, including zero funding.
THIS PAGE INTENTIONALLY LEFT BLANK