03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
CONDITIONS OF'APPROVAL ['OR TIIE VINTAGE SENIOR APARTMENTS PROJECT (PN 21-159) CONDITIONAL USE PERMIT, PI.AIINED I'EVELOPMENT PERMIT, AND I'ENSITY BONUS IO3 EAST NATOMA STREET
Mitigation
Measure
Condition/lViti gation Measure When
Required
Responsible
Department
NOISE/VIBRATION Dt.r TIIDF
56. Construction activities shall be required to comply with the following and be noted accordingly on the improvement plans:
l. Construction hours/Scheduling: The following are required to limit conshuction activities to the portion ofthe day when occupancy ofthe adjacent sensitive receptors are at the lowest:
a. Consfiuction activities for all phases of construction, including sewicing of consfuction equipment shall only be permitted during the hours of 7:00 a.m. and 6:00 p.m. Monday through Friday and between 8:00 a.m. to 5:00 p.m. on Saturdays. Construction is prohibited on Sundays and on all holidays.
b. Delivery of materials or equipment to the site and truck traffic coming to and from the site is restricted to the same construction hours specified above.
2. Construction Equipment Mufflers and Maintenance: All construction equipment powered by internal combustion engines shall be properly muffled and maintained.
3. Idling Prohibitions: All equipment and vehicles shall be tumed offwhen not in use.
Urmecessary idling of intemal combustion engines is prohibited.
4. Equipment Location and Shielding: All stationary noise-generating construction equipment, such as air compresson, shall be located as far as practical from the adjacent homes. Acoustically shield such equipment when it must be located near adjacent residences.
5. Quiet Equipment Selection: Select quiet equipment, particularly air compressors, whenever possible. Motorized equipment shall be outfitted with proper mufflers in good working order.
6. Staging and Equipment Storage: The equipment storage location shall be sited as far as possible from nearby sensitive receptors.
G, I,B CD (PXE)
City of Folsom Page74
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
CONDITIONS OF'APPROVAL FOR THE VINTAGE SENIOR APARTMENTS PROJECT (PN 21.T59) CONDITIONAL USE PERMTT, PLAI{NED DEVELOPMENT PERMIT, AND DENSITY BOIruS 103 EAST NATOMA STREET
Mitigation
Measure
Condition/Mitigation Measure When
Required
Responsible
Department
57 The owner/applicant or designated conEactor shall provide evidence to the City (via testing data or calculations from a qualified expert), demonstrating that vibratory rollers to be used on the project site would produce less than 80 VdB at nearby occupied residences, or all vibratory rollers shall be used in static mode only (no vibrations) when ooeratinq within 120-ft ofan occupied residence.
G, I,B CD (PXE)
ARCHITECTURE/SITE DESIGN REQUIREMENTS
58. The final location, design, materials, and colors ofthe trash/recycling enclosures be subject to review and approval by the Community Development Department. I,B CD (PXE)
59. Decorative stone pilasters shall be integrated into the screen wall design at sfiategically placed locations to break up the long expanse ofthe wall and a decorative trim cap shall be placed on top ofthe screen wall for its entire length to the satisfaction ofthe Community Development Department. In addition, the frnal location, height, design, materials, and colors for the proposed retaining walls, screen walls, and fencing shall be subiect to review and approval by the Community Development Deparhnent.
I,B CD (PXE)
City of Folsom Page 75
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
COI{DITIONS OFAPPROVAL FORTIIE VINTAGE SENIORAPARTMENTS PROJECT (PN 2T.159) CONDITIONAL USE PERT\IIT, PLAI\iNED DEVELOPMENT PERMIT, AND DENSITY BONUS IO3 EASTNATOMA STREET
Mitigation
Measure
Condition/lMitigation Measure When
Required
Responsible
Depf,rtment
60. The project strall comply with the following architecture and design requirements:
1. This approval is for a three-story aparhnent building totaling I I 1,755 square feet associated with the Vintage Apartments project. The applicant shall submit building plans that comply with this approval and the attached building elevations and color renderings dated June 3,2022.
2. TIrc design, materials, and colors of the proposed Vintage Senior Apartments building shall be consistent with the submitted building elevations, color renderings, materials samples, and color scheme to the satisfaction ofthe Community Development Departnent.
3. Brick pavers or another type of colored masonry material (ADA compliant) shall be used to designate pedestrian crosswalks on the project site, in addition to where pedestrian paths cross drive aisles, and shall be incorporated as a desigrr feature at the driveway entrances at East Natoma Street to the satisfaction of the Community Development Department.
4. Roof-mounted mechanical equipment, including satellite dish antennas, shall not extend above the height ofthe parapet walls. Ground-mounted mechanical equipment shall be shielded by landscaping or trellis type featwes.
Utility equipment such as tansformers, electric and gas meters, electrical panels, and iunction boxes shall be screenedbv walls and or landscaping.
I,B cD (P)
GRADING REQUIREMENT
61. Prior to the approval ofthe final facilities design and the initiation ofconstruction activities, the applicant shall submit an erosion control plan to the City for review and approval. The plan shall identifr protective measures to be taken during excavation, temporary stockpiling, any reuse or disposal, and revegetation. Specific techniques may be based upon geotechnical reports, the Erosion and Sediment Control Handbook of the State of Califomia Department of Conservatiorl and shall comply with all uodated Citv standards.
G, I cD(E)
City of Folsom Page 76
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
CONDITIONS OT'APPROVAL ['OR THE VINTAGE sENroR APARTMENTS PROJECT (PN 2r-r59) CONDITIONAL USE PERMIT, PLAI\INED DEVELOPMENT PERMIT,AND DENSITY BONUS 103 EAST NATOMA STREET
Mitigation
Measure
Condition/Mitigation Measure When
Required
Responsible
Department
SIGN REQUIREMENTS
62. The proposed monument sign shall be constructed of masonry, stone, or wood materials to be more consistent with the desigr/materials ofthe apartnent building. In addition, the final location, design, materials, and color ofthe monument sign be subject to review and approval by the Community Development Department. Lastly, the owner/aoolicant shall obtain a sisn Dermit prior to installation of the monument sign.
B cD (P)
OTHER AGENCY REQUIREMENTS
63. The owner/applicant shall obtain all required State and Federal permits and provide evidence that said permits have been obtained, or that the permit is not required, subject to staffreview and approval of any grading or improvement plan.
G, I CD (PXE)
CALIFORNIA DEPARTMENT OF'F'ISH AND WILDLIFE (CDFW) REQUIREMENTS
64. The owner/applicant shall submit a Notification of Lake or Streambed Alteration to the Califomia Department of Fish and Wildlife (CDFW) prior to commencement of any clearins. srubbine. grading, or site work.
G, I CD (PXE)
65 The owner/applicant shall incorporate bird and wildlife friendly sfrategies including:
a
a
Implementing an education program for residents to keep domestic cats indoors Installing screens, window patterns, or new types ofglass such as acid-etched, fritted, froste{ ultraviolet pattemed, or channel.
G, I,B CD (P)
City of Folsom Page77
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
CONDITIONS OT' APPROVAL FOR TIIE VINTAGE SENIOR APARTMENTS PROJECT (PN 2r-1s9) CONDITIONAL USE PERMIT, PI,AI\INED I}EVELOPMENT PERMIT, AND DENSITY BONUS 103 EAST NATOMA STREET
Mitigation
Measure
Condition/'lVlitigation Measure When
Required
Responsible
Department
PACIF'IC GAS & ELECTRIC (PG&E) REQUIREMENTS
66. The owner/applicant shall implement the following measures as recommended by the Pacific Gas & Electric Company (PG&E):
a
Additional bollards shall be placed within the parking lot to protect an existing PG&E transmission tower located along the southem property boundary.
Cuts, trenches, or excavations shall not be made within 25 feet of any PG&E transmission tower.
25-foot clearance shall be maintained from any PG&E tansmission tower during grading activities.
On overhead electric transmission fee strip(s) and/or easement(s), trees and shrubs shall be limited to those varieties that do not exceed I 5 feet in height at maturity.
PG&E shall have access to its facilities at all times, including access by heavy equipment.
No planting is to occur within the footprint of the tower legs. a
a
a
a
G, I,OG CD (PXE)
SACRAMENTO METROPOLITAN UTILITY DISTRICT (SMUD) REQUIREMENTS City of Folsom Page 78
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
67 The owner/applicant shall implement the following
Sacramento Metropolitan Utility District (SMUD):
measures as recommended by the
a Structural setbacks less than l4-feet shall require the owner/applicant to conduct a pre-engineering meeting with all utilities to ensure property clearances are maintained.
Any necessary future SMUD facilities located on the owner/applicant's property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the owner/applicant's property.
In the event the owner/applicant requires the relocation or removal ofexisting SMUD facilities on or adjacent to the subject property, the owner/applicant shall coordinate with SMUD. The owner/applicant shall be responsible for the cost ofrelocation or removal.
SMUD reserves the right to use any portion ofits easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs.
The owner/applicant shall not place any building foundations within S-feet of any SMUD tench to maintain adequate trench integrrty. The owner/applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.).
In the event the City requires an Irrevocable Offer of Dedication (IOD) for future roadway improvements, the owneriapplicant shall dedicate a 12.5-foot public utility easement (PUE) for overhead and/or underground facilities and appurtenances adjacent to the City's IOD.
The owner/applicant shall comply with SMUD siting requirements (e.g., panel size/location, clearances from SMUD equipment, fansfonn€r location, service conductors). Information regarding SMUD siting requirements can be found at:
https ://www. smud. org/en/Business-S olutions-and-Rebates/Design-and- Construction-Services.
The owner/applicant shall dedicate a 12.5-foot public utility easement for overhead and/or underground facilities and appurtenances adjacent to all public street rights-of-ways.
The owner/applicant shall dedicate any private drive, ingress and egress easement, (and l0-feet adiacent thereto) as a public utility easement for a
a
o
a
a
a
a
a
G, I, OG cD (PXE)
City of Folsom Page 79
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January'18,2023
CONIMOXS OF APPROVAL FOR TIIE VINTAGE SEI\{IOR APARTMENTS PROJECT GN 2r-r59)
CONDITIONAL USE PERMIT, PT,ANNED DEVELOPMENT PERMIT, AND DENSITY BONUS IO3 EAST NATOMA STREET
Mitigation
Measure
Condition/1!litigation Measure When
Required
Responsible
Department
67 Cont.
(overhead and) underground facilities and appurtenances. All access roads shall meet minimum SMUD requirements for access roads.
The owner/applicant shall dedicate and provide all-weather vehicular access for service vehicles that are up to 26,000 pounds. At a minimum: (a) the drivable surface shall be 20-feet wide; and (b) all SMUD underground equipment and a
aDDurtenances shall be within l5-feet from the drivable surface.
F'IRE DEPARTMENT REQUIREMENTS
68 fte building shall have illuminated addresses visible from the sreet or drive fronting the property. Size and location ofaddress identification shall be reviewed and aooroved bv the Fire Marshal
I FD
69 Prior to the issuance of any improvement plans or building permits, the Community Development and Fire Deparhnents shall review and approve all detailed design plans for accessibility ofemergency fire equipment, fire hydrant flow location, and other construction features.
I,B FD
70. All fire protection devices shall be designed to be located on site: fre hydrants, fue department connections, post indicator valves, etc. of-site devices cannot be used to serve the building. A water model analysis that proves the minimum fire flow will be required before any permits are issued. The fue sprinkler riser location shall be inside a Fire Conffol Room (5' X 7'minimum) with a full-sized
shared with other buildine utilities. The room shall only 3'-0" door. This room can be a
be accessible from the exterior.
I,B FD
7t. All-weather emergency accoss roads and fue hydrants (tested and flushed) shall be provided before combustible material or vertical construction is allowed on site. All- weather access is defined as 6" of compacted AB from May I to September 30 and 2"AC over 6" AB from October I to April 30.
I,B FD
72. All on-site cwbing shall be painted as.a fire zone (red-color) to the satisfaction ofthe Fire Departnent.
I,B FD
Cig of Folsom Page 80
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
CONDITIONS OFAPPROVAL FORTHE VINTAGI SENIORAPARTMENTS PROJECT (PN 2T-T59) CONDITIONAL USE PERTVIIT, PI,I\I\NEII DEVELOPMENT PERMIT,AI{D DENSITY BONUS rO3 EAST NATOMA STREET
Mitigation
Measure
Condition/Mitigation Measure When
Required
Responsible
Department
PARKS AND RECREATION REQUIREMENTS
73 The owner/applicant shall provide and record a dedicate pedestrian access and bike trail easement for the realigned and existing bicycle/pedeshian trail located within the project site. Upon recordation ofthe bicycle/pedestrian hail easement, the City shall assume ownership ofthe bicycle/pedestrian tail and all associated maintenance responsibilities.
I,B P, CD (E)
74 The on-site pedestrian trail which connects to the Class 1 bike trail (within the dedicated pedestrian access and bike tail easement) shall be maintained by the owneriapplicant. In addition, the owner/applicant shall install signage at the south end ofthe new trail connection that reads "Yield to Cross Traffid'.
OG P, CD (E)
POLICE/SECURITY REQUIREMENT
75 The owner/applicant shall consult with the Police Deparfinent in order to incorporate all reasonable crirne prevention measwes. The following security/safety measures shall be required:
. A security Buard shall be on-duty at all times at the site or a six-foot security fence shall be consfiucted around the perimeter of construction areas. (This requirement shall be included on the approved construction drawings). r Securiry measures for the safety ofall construction equipment and unit appliances shall be employed.
Landscaping shall not cover exterior doors or windows, block line-of-sight at intersections or screen overhead lighting.
G, I,B PD
MISCELI,ANEOUS REQUIREMENTS
76. The proposed project shall comply with all State and local rules, regulations, Governor's Declarations, and restictions including but not limited to: Proclamation of a State of Emergency due to drought conditions issued by the Govemor of Califomia on October 19,2021 relative to water usage and conservation, requirements relative to water usage and conservation established by the State Water Resources Control Board, and water usage and conservation requirements established within the Folsom Municipal Code, (Seclion 13.26 Water Conservationl or amended from time to time.
I,B,OG cD (PXE)
City of Folsom Page 81
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
CONDITIONS
See attached tables of conditions for which the following legend applies.
RESPONSIBLE DEPARTMENT WIIENREQUIRED
CD
(P)
(E)
(B)
(F)
Comrnunity Development Departrnent
Planning Division
Engineering Division
Building Division
Fire Division
I Prior to aDproval of Improvement Plans
M Prior to approval of Final Map
B Prior to issuance of first Building Permit
o Prior to aDproval of Occupancy Permit
G Prior to issuance of Grading Permit
PW Public Works Deparhnent DC During construction
PR Park and Recreation Department OG On-soing requirement PD Police Deparftnent
City of Folsom Page 82
03/28/2023 Item No.13.
Planning Commission
Mntage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 5
Vicinity Map
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 6
Site Plann dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 7
Preliminary Utility Plan
Dated November 16,2021
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
Attachment I
Preliminary Grading and Drainage Plan
Dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment I
Preliminary Grading Sections
Dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 10
Preliminary Landscape and lrrigation Plans
Dated October 20,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 11
Preliminary Tree lmpact Plan
Dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 13
Preliminary Access and Girculation Plan
Dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
.l
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 14
Preliminary Fire Access Plan
Dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 15
Preliminary Lighting Plan and Details
Dated November 3,2021
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 16
Building Elevations and Floor Plans
Dated June 3,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 17
Color Building Renderings
Dated June 3,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 18
Building Site Sections
Dated June 3,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
Attachment 19
Golor and Materials Board
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 20
Vintage Senior Apartments Booklet
(Separate Bound Document)
City of Folsom
03/28/2023 Item No.13.
Planning Gommission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 21
Site Photographs
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment22
Transportation lm pact Study
Dated July, 2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 23
Parking Memorandum, dated October 17,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment24
Parking Gase Study, dated January 3,2023
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 25
lnitial Study, Mitigated Negative Declaratioh, and
Mitigation Monitoring and Reporting Program,
dated November, 2022 (electronic version
available for viewing at
www.folsom.Ga.us/q overnmenucommunitv-
develpmenuplanninq -se rv i ces/cu rre nt-p ro i ect-
information
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 26
Gomment Letters from Public Agencies
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment2T
Gomment Letters from Residents
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 28
CEQA Response Memorandum
Dated January 3, 2023
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 12
Preliminary Oak Tree Mitigation Plan
Dated October 20,2022
City of Folsom
03/28/2023 Item No.13.
Planning Commission
Mntage Senior Apartments (PN 21-159')
January 18,2023
Attachment 5
Vicinity Map
03/28/2023 Item No.13.
Vicinity Map
F(}x,g()lvjl
Project Site
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Affachment 6
Site Plan, dated October 17 , 2022
03/28/2023 Item No.13.
l4ut&gc-
GsddrEe
lrlil
8-'*.""ffi'***"
@rtri
!@
Dmol{aT $Ml,sY
ffi(cs
ffiLffi
ffitls@d+ffiJ*t
PRI.]I,IMINARY SI'II.], I'I AN
NATOMA StrNIOR
APARTMtrNTS
CITY OI.'FOISOM, CA
siltEl'
sPt
EElf t*r*t*+*-*;
tlt O..n.d onv., suiic?"o
Pnon.' (o,5) 60r'o"o7
03/28/2023 Item No.13.
Planning Gommission
Vintage Senior Apartments (PN 21-159)
January 18,2023
Attachment 7
Preliminary Utility Plan
Dated November 16,2021
03/28/2023 Item No.13.
-{! };t:r
rFR-*-*
Pho.e:(e'6t60. or.,
PRIIIIMINARY I.iI]I,TTY PK\N
NATOMA SE,NIOR
APARTMENTS
CITY OF FOISOM, CA
nlglmb: ?Romb uhlsc
illuu!l!!I-
*;r;,
?/
+!;:+-_4--
,'"***i/
'. I
- -lL l__
/ '-\i j4
EI
*4
,!i
i!1. l
^Ato!i
si:Ir9il nliSr$lhl:Pr!l-i{lNitr L'fli.tlY ft,nil
/th\
''{a)"
B;IlFtr-Ft-
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -159)
January 18,2023
Attachment I
Preliminary Grading and Drainage Plan
Dated October 17,2022
03/28/2023 Item No.13.
sl r)\ttr rllA ltQlf ir\n:\r\
ffi!rJ,'\'i
ffirrr{ns}
st t ilrr
L-E
Iiso:tote.+***
PRIil.lI,llNARY GItr\I)lNG PLIIN
NATOMA SENIOR
APARTME,NTS
cnY oF rotsotl, cA
t4i!J!-u{!rur sp-(r!]t !l!!I\q
\ rrl'o'
-:!!-!t!:!t!!_-gEq:l.--,,...',''
F8.,."'.".,.
rl"*.r."".-
Iil"*"'^'.'"
$$+iL
'
'a --:*
-\L -- --
-z---*-'-
a.!
't,
-,t''.- -!- -+- Nitoy^ s!:Nlo& il,lRr\!|N]s
Pklt.tglNASY cRAolNc l,r.AN
octEaul r?. ?o22
i{
€! .,,/ /a \-"w'
s
EtrFTET:C;;=
,"1
.'.dl.:'
1
03/28/2023 Item No.13.
Planning Gommission
Vintage Senior Apartmenis (PN 21-1 59)
January 18,2023
Attachment I
Preliminary Grading Sections
Dated October 17, 2022
03/28/2023 Item No.13.
LTElf .**t t"+*+*
,ho^er(116)6os qo7
I'ITIi:I,Ii\IINARY GRAI)ING SIiC-'[IONS
NATOMA SE,NIOR
APARTMENTS
cnY ()l'r,orsOM, oA
,ir..u,
ii. *y.t"!'
ffi_-ffid
;ii
?
..','...*-'lJ
I .l
:.gcr,q _34.1
"1
i
e|6:so6rrtd \$_,
l:
1@ /r- Dl()n1.11;\ll()Nl{n\11:Rl}l;lAll,l-/ffi
n'\ (xr.\Dr\(; s}:cr10N -silu:t:t \v[)[:\Isc- u\sl olj PRlsO\ lt0Al) E
li
[,.^_.,,", N tO\ln SiiNlOn 4111fr-!l
I
I
PN!II I\IINARY CRADItrC
$i:l;rEffi;;ird slll:l-1
03/28/2023 Item No.13.
a (:nAIns(;5ll:11()tr"
silEgr FMnd:(!r6) 5or'o7o7
FA".-"'.-*
/ii\ (t{ DIN( ; staal():.'(;/ffi-
/6}\ (;lL\DlI(; S!:(:llOS
\:7ffi
|drd*'6't'* W
I
FGFGI+ts-J
SENIOR APARTMENM
03/28/2023 Item No.13.
Planning Commission
Vinhge Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 10
Preliminary Landscape and lrrigation Plans
Dated October 20,2022
a
03/28/2023 Item No.13.
i,".{r! !r }r,,a-i I -q.n r&,rn ,iir.,l
--' , "" :.,
v:) 6()s i;:
llNVlci ldvfSCNVl AUVNIwll3laS.iNlW i UVdV COIN :S Vr/iC] VN I*
'J-\---*-
)
:,.,/ \\/'
{'
'a1a-
',., rrqir.r.i\ri-
.rP iY:ri*:.-\
$
"1
i '.$ \i:j::_JL*
,l,rrcE,ta rtc:1rtsnr jl'1ra
!r:5! ldr.c !&! 5\rrric:
sf!1 scfla a\rcoior3x lrr \r5::dr 9\[srx!
Jn L 1r !xlwn9 i]l!l cl*'rd !rr *og4c{ rr)5!rd rr! Borr $!l5roa cR tr\lnnoa o! 3SN*SIC !l V:!v Sal d CEC" * tJ$ lllx',!:rr:Cs illmn: ! lYdlA:t9rrcilrlt'lllol rYlstrliaY :::
i,; :
I
I
I
. t;.
f,
03/28/2023 Item No.13.
(.t
I
T
f
i!Af I]MA qFNIOD ADA'TI1I:SIS col oD r at{r)sa aor: Dl lr{ l]C ll!fiFLa :,":l:1:i'X.'''iJ "'"'""
03/28/2023 Item No.13.
t. ,, :,
rl
:i
i '::
1r :
i:
t- i: ''
,l'r,,
:?;,
i1:r
: fia ).7
Ii_ Lr;_.!-Ir j,-.--:_j .
rii, i
+!;t
z
o3
: t;" ',
:'-{,'
-..":
:r'..*{'t.'l,.
II;:ii
li.
ir
j:-..'
i":'
03/28/2023 Item No.13.
. ,-.,.,";"";;i:"*j: &c. *d{or* vr '!csrc:
v -lxtq trvrm tl Nvtd^INlr^rv slNlwruvdvuorNrsvworvN . ffidct*ffi =la.
+\-----
I
",/
\.1"
<1r11rl01ttl:!9{r:YrtrSsEffirmtorvillsh.r{Htr8rr** bi roleldFJrllltstorrlr!!svrf)il/osG@rno 5
^r!swooirrlrt*crBitr)eds
^vdrv^ras$sld r)ryDid/.mr
stroNAi, rno YrCD
n 5t
"f..'.-
:r'i'
;!
:.1
03/28/2023 Item No.13.
q
TI
..
I
t
!
I
t' :i1 i;::aj;!_r._.!.:1... :-r,.: .'
.VINTAGE ALTSO; ii, riorj ltri)ir^ja ^-r:
rii r 2C l.lh{rv
,Iru
I I
MONilMFNI SIGN 01 ITDOOI S'AI ING * DINING AQIN
..4
DOG Pi\AK BOCCS llAtl Corrllr BtKt aAcK DrcNrc ir\at I wrrir iJM{tnlr 1A ouiDooa 8Bo/ KIcHaN 6 ir ut\cts
NA PQFI tllIIlANY i.ANDSCA}E IMAG: BOAAD
03/28/2023 Item No.13.
vcludl AdvNlrr',Jllldd
t
F*Y*ryR*iT**Ks +--l- .**u*S*t*6u*EF *'S-*'*'$,---
N**-: - f
ffi .sN ffiff;5.,
eq*trws"sil-s*qswuENi i .$p
i$i.*t':
vi
itrtr
N.
N
E
I
@
dw
@
"*n
-J}.'eo s
I. I'...': .:.;.:i L.L' L r:1!]Ll
i*'i Fnmla-:-*--'ffi
-ffi
ffi
03/28/2023 Item No.13.
Planning Gommission
Mntage Senior Apartments (PN 21-1 59)
January 18,2023
Atrachment 11
Preliminary Tree lmpact Plan
Dated October 17 , 2022
03/28/2023 Item No.13.
t[n"-"".-*
r!5 O..h.rd Mv.,svr!! rn.
pbo^.:(or6)60t oro,
'r'lrLl,: IMl,Acl' PIA\
xnr-oNIAStr*Nron
APARTMENTS
cltY oF lolsoM, cA
!
4mn&llqgl.a!
o{&
xo4,
/t
,fl I
t::
' '--1 i''
- . - - -i-,i- , -
jl
:
\t
-1.:'>'= (
NAI'O{A SINIOR APAHTMENM
TRE}: II{PACT PLAN
ocTotr:R t?,2022
-'f'
(&"
FSF TEFE=I
03/28/2023 Item No.13.
Planning Commission
Mntage Senior Apartments
January 18,2023
(PN 21-15e)
Attachment 12
Preliminary Oak Tree Mitigation Plan
Dated October 20,2022
03/28/2023 Item No.13.
mLA
ttvt!tox3
s
(8
tzna20n
VINTAGE SENIOR HOUSING
TREE EXHIBIT
t-I
rn
X
r
v
I
rn
x@{zo
-{nmrnV
J
oD,n
=Ez
rn
x{zo1p
tntn
{o
@
n
:fm
o
no
aq
D
i9
iid
B€&
:;e3
2(!&
:o
:t;
oo,
s:
qg
(
\ //\
o
i-@
q!!
o
olc
PT:u
5'
T
I
I
1c|
D
ovo@tflg
Jann
oTn
I-lrn
Jp
mm
-{o
Dm
3 2
gs
Go
I
tv
'
q
$r
u
!
t. 1:
i."#\
I
)
{
,&
It
I
I
rftfrtftFtirq(E:r:!€{!i!i$ri!*{i{Iifrit::{i5t$rtt{8c.8:tit{tiriiu/.f. 4b
f iriilf?i?t tst
t: ?i 1\'l
::it
r r Iffrr$rf f iri r; i i tIfff ailIrtrftrf rlrif f If irf ilti;I tilIttlll ; : i ;iiti i t i i : rl pl I i iii;r i: 5, t i (tti ati i i i ?fiif i iiiiJ r'i I $i li r! f lir'rrriliiirilill i iiitt rrli'l rr r i?iliiii?iiiii?ifi ;iii''di f ?ii ! ,r'-,r. !rrrrt'!jlill:.:,. r r, .. ',i: :',i;'.i..'..tt.'.::.1:'- l' aiiiai+if : i;i: :r,i+iir
: : -i: {ii{.r.:!t;,;.i+ri-.il: .".1r:;j i r
Ll "t',tl'it,-'_.;:,:ir.i...: ::.i i:i ."i, ::. ii ::
:.::,:,:i:,:,.::r,r,r:-,';-::r:':;:i-.i.1. , ttl ,1,'i ,,, ' ' r:''i ,,1',;;;;;',11". .-1 "i /.
/ ir,ii, r:jnir-'i iiiii i::a:ii;j ri
^i
i':-:: i.:-: i-. i..:l ].1i: a :r; i')i::il-:::i.::::-'ail::a t:::l::ii::::,'ir:
.r.:-.;..-ri::tj:iJi;::.:;:..riri.:..;:.:';-'...:.:i.-.::;.a:.a.;a:.a.,.aaia!:t',.at,,r-,,t4. i : : :;;: :i::..-:i,i.' i ,. i : t!;.i )il , I ilil ii:
; 1, . ,. .::. 11; ..';:j..-il ;:,, r. .'_.:l:j:. :1.. 1 ]' . - -..: ']1;
:
ii;aiii i
rlliitrr!r' r
!
I
i
t!
!ii
ttit
tl;fillt
I
l_
r
L;
!i
,lli
;i
!
,1 !
t
'! a
{
I
itIr:!
i
i
-:{+ii ?il ::
ll llt
i 1:
I tr
03/28/2023 Item No.13.
Tree lmpact Summary - Natoma Senlor Apartments
DSH of removed or impocted trees 571.3 (68 totol trees = 47 protected + 2l unprotected) DSH of preserved protected trees (5O% voule) 182.2 (55 totol trees = 3l protected + 24 unprotected) Mitigotion plontings on-site oo
DSH Bolonce
ln-Lieu fee
389.2
to be determined
Mitigoted
DSFI
Site Tree Plontings
15 gol trees
24'box trees
3d box trees
quontity
9 20
DSH
I
2 5
o
o
o
No miiigotion is proposed thro
Tuesdoy, Decembe r 2o., 2022
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -l 59)
January 18,2023
Attachment 13
Preliminary Access and Circulation Plan
Dated October 17 , 2422
03/28/2023 Item No.13.
p
PRI':I.lillINARY ACCTSS ANI) CIRCUIzfl'lON PLAN
NATOMA SENIOIT
$r
#
APARTMtrNTS
cnY ot't orsoM, cA
IJIIJD-
I drs@ra
:"..*
c
.!-
p
b
\s
ENlf -""******"+ry*
,1
\t .*.t#h{
"@,
EIJFrc=J
1 I
;-.l. -fl -'--'--
NA',TOVA St:N10R it'iRlVllNl:
Plill l\llNltr iccr:.ss iND
clRcul.llnN PI.AN
o(:1ontl t? 2022
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January'18,2023
Atrachment 14
Preliminary Fire Access Plan
Dated October 17 ,2022
03/28/2023 Item No.13.
FH--,'".---
eh^.:(9r6t6oo.otozll[ifT
PITTiIJMINARY SITI TIRli PI.AN
NATOMA SE,NIOIT
APARTME,NTS
c[fY ol.']'orsoM, cA
!!rg3t!ll$ lwt ];u]ls
n(N.rr!!r
- ii;_-
%'1r,
,
,,o
a4
^.,. I
I
I\.')-
---+--:)t:->- i!
I
I
t
11 ,l;':l
,:E
,@"
, \ rt..u'*, :r
;e *"'
oo*" ArA&lrt:I b-
frnl Pl iI
atll22
wF;l=l;;-l
03/28/2023 Item No.13.
Planning Commission
Mntage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 15
Preliminary Lighting Plan and Details
Dated November 3,2021
03/28/2023 Item No.13.
!
..-..F-
ECIRICAL SI{EET INDEX
E
-
-
E0.1
i
(FACE
of
frxIURE)
LffM fin€ 5CtsEhE Wl!5
Oare w ss * s..He ffs {.e
al@a]wds!*e F,ruffir&
!trN.4tf*b
@ero&M
6f,r..iq6.tadE@
e.s f. & rYsl3'@ ssrd-du@d
O @8fre61ua.€oE.dffi a&
'setg&dr'*.F{sE@ ffi
4Ar{*5's{V'd
t*!tr GGad
o
5aIo
o
F6
-
i-n rn***t
:_:::
--i
@
E
Izlrl
t,
a
o
k22a'
{ilrN.}
r,dj\IED LI6FTI!I3 ELEC'RICAL DEIAII.
dIAt! MTESa€iNEDtgt&
-.mN@eq6earr6s*e61
-
Gdide.aireteB &@.et
-J!!,''aFarcwa**ww@ ffi
4rRs^'i6w&et@:dEr *ffit*uN
-l'd-MriklJl*k^.trasn'@-fuffi@rd @tuE
{!& 16 @ru@t rft r!484 roarst
ffid@ aeG{6*ffi4's5'l&S
66a EErL !rrua* {6ffiMbasw
ra€ws4s
-Ba F ELn-a'k,ru e & @€h'E{g&
- taLu.tMr*t 0 4'tA E@'rMW I b'dA
o
PER
JrF
03/28/2023 Item No.13.
rittrlt\.!
r
ilrl *l I
SriE pLiN - LG*].NG
;\
rrt
' ,.'." I ,,''
nd
G
9ozts * uz "_-
ouI=a>9
IFEk<'z
"..."* .- -.r'1" *- "'" *' '*' ""
I
I
in
I
I
I
n
i."',\\
;r- ;
-
2nfli
*IlwgT
-
NtrM 3?@I
ff
trtrA-uffic rJ.mlJffi:I:u
b-dr
''@'.'{r
E1.1
03/28/2023 Item No.13.
ta \
-{a
r i-*.a a ? : ; i !
'.1.
ial:
"r:'-'
!-i
i,i ,
ai
:i:$ .
"'l
a
::
aa':oil:
itrni
;-,tz
oti
: !f'
lf,
it
j
0 tEii
i i6l
uf;[F
elf
fr;i
BFE
iil[
UFI
!u
t!l
-0
I-
o
;l
:1tn*t
il
c)
(-)
I
ncrl"
Qz
ii
I
!
E
o
/
/a
ta
,t
3lE
F
ill
Eln'tE
l$
^'' ;-t r)a -
!.
lrriil!- ' l
::r.;!.f,: -,
,!
Ifi*
!
B
t NATOMAS SENIOR
APARTMENTS
CITY OF FOLSOM, CA
m
iu ,@ll
03/28/2023 Item No.13.
t'73> utJ d4- .*tsffiMtr qwlql!
Eh*
*ffi flFh
[email protected]$ancs
'r&tm
srgr
ffiw,ffi
t gull&ElrE
t@
-
-
--
z
->l=!od *3
E tn-= z'/tY.lZo6
!
".. .... w;it
dKV
#
*\wF"
d€H
^I:i3E!i@r
'_'**'
rerslilrcre
ffil;;3
.4'.n' [email protected]#9,
ir&d-*d^s4.qr
- -". -^E' r iltqgEg
li !4ttrF ryryi, oln e39(lrlA
.",..-- -..':---':;'.1:.:. - - " SeSffiA
-1..1-'l
rI=d
E
,r@I
qq6*
*--.--eag.ffi*h*sq
r-tL;"'- ': l:-r-jr-. :
=i=:1ir-:i:-i-"-t -;i
lt6ffirllrrtrcilIn-ra
dd.€E
;::miry GIEI
@
ffrriar
. .,.{.1n.a
c
t
wit
q
H T
03/28/2023 Item No.13.
i;
l
fi
H
;,:
:i'.'' :
iii .,
!ii
i::is_, I
-;\
I
-
t
i ii
,1|!
:it '
;
itl
'i,
_',&
JE
\i::6
H
B
-_!3Ll.il
::lit;
fifitfriil
i''l
[rilillfl
ti
lffiffi
ftr
t
I
I
c
:[i
4I
I
IIt
I
I
:;
!ii!.1;'
:il
ii'
I
['s[
tI
iJ
. ,.;i,ll I
.i,'i:
: r:':i :l!;:1.
r; . r,ii
: ,.:. ,
. ,,.1j
ii:,'i:' :.,
,llr'':,r1.:,.llt: ,
".:.;:.:rr:',:
" ;:r:
iiii
fli
ltl
1- :.; -.
ii
riiiiiiirir fl ';lii;iil I t:
'
E
!
I
t:
1 T
Ii
':
ji
ri i!lillll
O':i
i.
ll1
t!jrl:
iii
ii
ii
il
l'
t
tI
I ffi1ilril
tI
I
I
ilII
rl
t
I
I
I
t
I
I
I
I
I
f ,i'r 1
:,1', aa
l::;
i:r'.
',1)
,€
E€
I
::,ii;;
t7
:x
ir
;s
ilrrlrt : i
i ]:
:j
fi
I
:i
clifllll ! il i;;i:,;: .: :.liiattl;ij ..;:..:
ia
::::[iiiiq
llr
ui
.l
I
{
'1
:i
:i
I'lF
iiili
m
lulu
NATOM/\S SENIOR
APARTMENTS
CITY OF FOLSOM, CA
'*1r
'@il
;[ e1
03/28/2023 Item No.13.
I rt!r!r!!IIiI!
rr!rrrrrlrrrrr.ro!.il!r.r
I
I
t
a
1ir,Ii
i'li
rii.
ri
li:r!tirll!i
ii,;i;
i
:
iiiit rl|
'tit u
i;i
IItR
tifi
li:.,:)!ri
iitii'iii
' i i ii!iliI;ft
t{r;l!!
rlilll:1
!iliil;
ril',;i'i .rli,i!
I
I
rI
$
!!\ltlllllifilililE
Ititil!lilrli
iiiliiii!r l!i'rr al
i ;i ir
iritl
i ,l !i
i!ili
r; iiliriit riiii!'
irliiiiriiiiiii
liiiiiiitiiiii
i'iii!iii;:t ii !i :
:lllllliilll:::illiii:::lll!'i::i:ili:;l;iil::i:liil;: i il:!,r:'1 ,,,a,.r,rrr,rr,'o,{.,,,11r|.,rrt.,r'rr.t.r"!rrr:1'rrrisr r.rrlr',:!rrr'.^rar,:'.-.11.'::ir.t .r.ri: .''l !ttgr illllti,.:rll r)itllfiIr;r..r" irtFlr r,tr.,r;,,,.tt. ', ttll.!ltrr' r,tat. :it!tlrt'ilrlrr. rlrlt.: i:r'rtIi.JtPr'.rtr.!t."'l rrtlrrt!Itlt! rrlltllrr,.rlail {rStlrr,,rrra{J.r :4ilr: :irrli,ll!ari.'i..,rIu,'..'t'.':rtrrr'.r.ll',?,lllr' t'!u,",r,lr''r'r lt!!rrrtltilrrriltl;rir:ltdrrrrtrar;r'irr4.r:'.alIr'.lrittr ..ritrr,.:rar,!,,rtrr..,r.rft ,,iatir'.'...u..rrrrrr!r,'rtlr'r''?t ;ii:j;:::lil: i: :i:l:: ::il:!il:::l:::.;::!liii:;:li:ii.;lii:;:i:lr! lllili:tlllllil:!!!ii::iiilili'il:ll::;llliii;l jlli::::;::l:lrl:i t /! !;
"0,9608€t *0.
l!
ti
ir
li
i
i
I
iI
iiiiliiiirtll ,', ii
i
l!.!
:.
.-t
ttttlrrtrrr'!.E
;lritirir:{i$i
i! !E!t gE
iinr,,,urn tu,'i $
ii,",'."$l i
i' "' ' """'tt i'i:i:i;;;;;;!;;i;[ L
;:l:l;;llll ;l;;$
?i1;l:iiIl:::lill
llll):illll:lli:F
ii.rjr!tt I rj! ' 'i,rlir li;l!iii:, llili'liilri:li
i'' r i:li
il lr
rl ri
!t! lt iil! iiliri i ::l :liii I ir! iil
lq
!=ir(9
,t:0 r e
,,;,,,,,i,,,;fi fll i
ititiiiii iiiirr! irrr'tlrli { t
iiiiliiiiil!" ' l[,,,i-: t
I'll't i
l;:i;lr lirl 1:
I; '1!
,irrl'i,i.,r r;
,i , i!.' :
lll! Inrurrlrrrit!
, .si
gi
rl! i t tl:l
ilftii
ir{i'
NATC'MAS SENT('R
APAMMENTS
CITY OF FOL$OM. CA*1
,'li i', il
-l,i
!l'
lii'i
I
t
ltPage 487
03/28/2023 Item No.13.
Planning Commission
Mntage Senior Apartments (PN 21 -159)
January 18,2023
Attachment 16
Building Elevations and Floor Plans
Dated June 3,2022 -
03/28/2023 Item No.13.
FOLSOM
NATOMA SENIOR APARTMENTS
VINTAGE HOUSING DEVELOPMENT
. REVISED
Naloma Senior
03/28/2023 Item No.13.
s-
.nF
,- -Ulj
CHARACTER ELEVATIONS
s€lo: 3,|2' = 1'0'0n24x36Folsom - Natoma
5K
03/28/2023 Item No.13.
=
I,1\.
<i
5K
GROUNO LEVEL PLAN
BUITDING PLAN . SOUTHERN HALF
- Natoma Senior
NMber
03/28/2023 Item No.13.
a
2nd & 3rd LEVEL PLAN
BUILDING PLAN - SOUTHERN HALF
il"\.i/_ '
- Natoma Senior
Housing
03/28/2023 Item No.13.
t{EtfiET{AE {t*!l tltil*
ROOF PIAN
BUITOING PLAN - SOUTHERN HALF
(r'\at
- Naloma
03/28/2023 Item No.13.
{TIilfi gtl{t it{{r
ROOF PLAN
2nd & 3rd LeVEL PLAN
GROUND LEVEL PLAN
BUILDING PLANS- NORTHERN HALF
t:::l
5ll(
rl
Folsom - ffd.1{d 2a6 h
03/28/2023 Item No.13.
rtrB
dtrrlir&r-{-r"t
r tm( tr.r.f.n
r ardtx/|wf.rrri.1
t rK@ cr'Jrtt-i.a@IlnB
' gr*E ?..- t .ai
f A1 ILlU-r!g
t6ffillgMaY-:s---.,-
les-
ffi
riar I d-a:s.--..-
ri*a trt's€
F-.<q
dt.g l/dr{n
I ell*' F-vtt.n
f_rrl'i)
TYPICAL UNIT PLANE
i
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-159)
January 18,2023
Attachment 17
Golor Building Renderings
Dated June 3,2022
03/28/2023 Item No.13.
Folsom - Natoma Senior VIEW FROM NA'TOMA S TREET NORTH
5KVintage
03/28/2023 Item No.13.
VIEW FROM NATOMA STREET AT ENTRY
Folsom - Senior
03/28/2023 Item No.13.
ft
r5t
Ein
ul!!l
- Natoma Senior
5K
VIEW FROM BIKE ]RNIL WEST
Housing Development
03/28/2023 Item No.13.
Folsom Senior VIEW FROM BIKE TRAIL EASI
5K
03/28/2023 Item No.13.
Planning Commission
Mntage Senior Apartments (PN 21-159)
January 18,2023
Attachment 18
Building Site Sections
Dated {une 3,2A22
03/28/2023 Item No.13.
r :,1.. !.il i '
r 1ii1:i,"''
wdrqd'I w
Senior SITE SECTIONS
5K
03/28/2023 Item No.13.
SITE SECTIONS
Folsom - Senior
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 19
Color and Materials Board
I
03/28/2023 Item No.13.
LEGEND
TI WCDE
ffil1.2
+Hitijlril:l
I$3,r/],iliir:t I
itliild,i ii
A, B,
DUNN EOWARDS WOODED ACRE (OE6130)
DUNN EDWARDS WOODEN PEG (DE6215)
DUNN EDWAROS MIONIGHT BROWN (DE621O)
1. B.
c.
E-
3. STUCCO
BOARD AND BATTEN
BRICK VENEER
ASPHALT SHINGLE
WROUGHT IRON RAILINGV
MATERIAL & COLOR BOARD- Natoma Senior
03/28/2023 Item No.13.
Planning Gommission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Aftachment 20
Vintage Senior Apartments Booklet
(Separate Bound Document)
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 21
Site Photographs
03/28/2023 Item No.13.
FH--.--*
Dhon.i {er6}6o! oroT
ITT.]LIMINARY PHOTO EXHII]IT
NATOMA SENIOR
APARTME,I{TS
CTIY OF
a sl|r:ul(ilrr(jffi /-t'\ SIII:Ill0f0
f;ffi
g4.* '*" i;^
u\ srrt: rtt(tt()t7ffi
/ii\ sfn:It(rfot7ffi
A STI}:III(II0(;ffi .{\ srl}:lllOl0(ttffi
/i\ sl'11: l,ll(tlI)( ,/ffi
A Srrt:tll()l()
t;tffi- -@"
n*Lr.EE5--A
\iTovr si.nxlr 4l^l]ttt:ll!ftiftt!iIln] !iloio a\rllli
ri\ st[-Hl(rfof7ffi-
/A Snl:III0IO f '. Srlli Il I(r'l () r\ir SIII:IlftIIO
f;/--
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21 -1 59)
January 18,2023
Attachment 22
Transportation lm Pact $tudY
Dated JulY, 2022
03/28/2023 Item No.13.
P21130
Natoma Senior Apartments Transportation lmpact Study
Folsom, California
Prepared for:
City of Folsom
Helix Environmental, lnc.
FCC 50, LLC
NTKEAR
Prepared By
TRANSPORTATION PLANNING
& MANAGEMENT, INC.
Contact: Tom Kear PhD, PE,
[email protected],
(e16) 34A-4811
www.tkearinc.com
February2O22
Revised July 2O22
CfvlF.
03/28/2023 Item No.13.
(This page intentionally left blank)
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTra lmpact
REVISION HISTORY
Date Tltle Comment
Feb I,2022 Draft TIS
Feb LO,2022 Final Tls Clarified geometry for secondary driveway and added review of at 139 and L44
JulV 5,2O22 Revision reduced to 136 and revised site n.
EXECUTIVE SUMMARY
This analysis describes the effect of the Natoma Senior Apartments project (the Project) on the motorized and unmotorized transportation systems in Folsom, California' This study has been prepared for the C6y of Folsom (City), Helix Environmental lnc., and FCC 50, LLC. A Planned Development permit and Conditional Use Perrnit are requested by the applicant for the proposed 136 age-restricted affordable apartments'
Proiect Description
Figure ES-l provides a Project vicinity map. The Project consists of 136 one- and two-bedroom affordable, age restricted, apartrnents located across from the main entrance to Folsom State prison at 102 Natoma St, Folsom, CA 95530 (parcel 071-0320-042). Two access points to East Natoma St are planned: a full access driveway aligned with Prison Rd, and a right-in-right-out driveway near the eastern edge of the Project site. One hundred thirty-six parking stalls are included along the drive isle along the southern and eastern edges of the Proiect. A preliminary site plan is provided as Figure ES-2.
Accessible pathways are planned around the building to provide a walking path for residents.
Sidewalks along the Project's East Natoma Sffeet frontage are included from Prison Rd to the edge of the existing sidewalk at Cimmaron Circle. The existing multi-use trail connection from the Oak parkway trail will be preserved, and a pedestrian connection will be added southernly from the Project to the Oak Parkway Trail.
The site is designated Professional-Office (PO) in the General Plan and zoned as Business professional- Planned Development District (BP-PD). With the Planned Development Permit and conditional Use Permit being requested the Prolect is consistent with the adopted General Plan and zoning,
5l f nEan wrrywtkearrnc.com
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation Impa ct Studv
6 Natoma Senior APartments Sl rrran
Vlclnlty MaP
4,^
\
o
C,{slrto&araJa
n-td
5{
,l
,!s1
FROJECT
. tt(
-"*
ciry Hall
ft
t4Eyrr "-..."
\"a
+4
,dral-
a\F
,'.6,€ ,(b
f
Figure ES-l.Scholar Way Senior Housing Vicinity Map
Slrnrnn w'w,tkeerrnc.com
03/28/2023 Item No.13.
Natoma Senlor Apartments Folsom,
Callfornialmoact Studv
{#.*,,..---. -'
:itr4n t.
r. ffi -I
tfr::-.--- I
lr.,--... I
If.-.* I
lr:r --.
1 lEl,-** |
l,Rl;l.lMh-AllY sl'llt PIAN
NATOMA SENIOR
APARTMENTS
cIt"Y Or lOI.90!1, CA
I dtHl'.1:'*'* .--- -;; itta*tffi - +J{,4 I
t --." I
ts€r::::--=:-jj
v
.t
:L.
U#
qb
Flgure ES-z, Prellmlnary Slte Plan
S f nEnn wwwtkea'nc.com
iil
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Studv
Analvsi!"5.coPe
The analysis considers the traffic operations at intersections in Folsom that could potentially be impacted by project traffic. This TIS considers two study scenarios:
o Existing 2022 without Project condition
r Existing 2022 with Project condition
The two driveway intersections (shown in Figure ES-2) were evaluated for conformity to City policies and policies from the adopted Folsom General Plan. lnternal circutation and sight lines, parking supply and fire access were all considered'
Table E5-1. StudY lntersections
locatlon Control
1. East Natoma St/Prison Rd Signal
2. East Natoma St/Eastern Proiect DrivewaY (sssc)
Findines
Project impacts are anticipated to be less than significant. Ten project specific findings are made' Finding 1{Trip Generatlon}: The Project is anticipated to Senerate 441 daily vehicle trips including 39 AM peak-hour vehicle trips, and 41 PM peak-hour vehicle trips. Fewer than 50 peak-hour project trips are proiected to pass through any intersection' Finding 2 (Level-of-Service): All study intersections are anticipated to operate at level-of-service B or better under all study scenarios. The Project is not projected to create new deficiencies or worsen existing traffic level-of-service, pursuant to General Plan Policy M4.1.3. lmpacts to level- of-service are considered less than significant'
Finding 3 (Vehicle Miles Traveled): Per capita Project VMT is projected to be at least 15% less than regional per capita VMT. Project VMT impacts are considered less than significant' Finding 4 (Parking): The proposed parking supply of 135 spaces (1'00 spaces per unit)' The Project was found to be adequately Parked'
Finding 5 (Minimum Required Throat Depth!: The standards for driveway throat depths are met.
Finding 6 {Emergency vehicle Access): Emergency vehicle access is adequate' Finding 7 {Pedesgian and Bicycle}: The Project does not result in impacts to pedestrian and bicycle facilities. lmpacts to pedestrian and bicycle facilities are considered less than significant.
Finding 8 (Transitf: The Project does not result in impacts to transit facilities. lmpacts to transit facilities are considered less than significant'
iv
Sl fnEAn wwwtkeartnc.co-,
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Study
Finding 9 (Driveway Geometry): Proposed geometry for access to East Natoma St is adequate' Either a raised median or right-turn channelization should be used to limit the secondary (eastern) driveway to right-in-right-out access' Note that the secondary (eastern) driveway was modeled assuming a shared eastbound through-right turn lane, without a right turn taper or deceleration lane. Anticipated eastbound right turning volume is less than 10 vehicles during the AM and PM peak-hours and neither a right tapper or deceleration lane is required per city of Folsom policy' However, the c1y reserves the right to require either a taper or pocket at the discretion of the City Engineer. Finding 10 (Signal timing): With the addition of a fourth leg to the East Natoma St/Prison Rd intersection, the signal timing and lane geometry was assumed to be configured as follows, or an equivalent plan to the satisfaction of the city Engineer:
r Eastbound: An eastbound right turn pocket was assumed with 150-feet of storage and a 60-foot taper; for a total of one left, one through, and one right turn lane' . Westbound:Awestbound leftturn lanewith 100-foot pocket plus5O-foottaperforatotal of one left and one shared Through-right lane'
. Southbound: The existing exclusive right-turn lane is assumed to be restriped as a through-right turn lane (for a total of one left and one shared through-right)' e Northbound: The northbound approach is assumed to provide one left and one shared through-right lane. The northbound through-right lane is assumed to be in a 70' turn pocket Plus 60'taPer.
o Timing: Eastbound and westbound protected left turn phasing, northbound and southbound split phasing. 150 second cycle length, with 34 second northbound southbound split phases and 20 second eastbound and westbound protected phases, and G2 second eastbound and westbound through phases. Crosswalks are assumed across all legs of the intersection with flashing don't walk phases set to 22 seconds to accommodate a 3 foot per seconding walking speed'
city staff have noted that the East Natoma st/Prison Rd intersection may be an excellent location for protected-permissive left-turn phasing (i.e., "a flashing yellow arrow" to allow left turns during the conflicting through phase). Such phasing would increase the intersection capacity and reduce queuing for the eastbound through movement. lt is our professional judgement that novel phasing plans, such as protected-permissive phasing, have the potentialto confuse elderly drivers and pedestrians, resulting in increased accident rates. Because protected-permissive phasing is not necessary to maintain the General Plan level-of-service goals we do not recommend it for the entrance to age-restricted housing. The project adds a fourth leg to the existing T-intersection, which requires upgrading the traffic signal hardware. At the discretion of the city Engineer, those upgrades may include video vehicle detection, connecting the signal into the City traffic management center, and traffic signal controller upgrades to the satisfaction of the City Engineer' conditions of approval can be limited to the city of Folsom standard conditions plus a requirement to time the traffic signal at East Natoma St/Prison Rd to be consistent with finding 10 above, or a similar timing plan, to the satisfaction of the city Engineer' &I:KHAR \l ! :,:a \t i \"t,|:a. a ; { : I, (. t:.'.t t r
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTransportation lmpact Study
(This page intentionally left blank)
.::../\t'.: lt,?i,.,lt .. . .'',"5l rnEan
VI
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportat ion lmoact StudY
Contents
REVTS|ON H|STORY....... """""" i
EXECUTIVE SUMMARY... .,."."... i
1. |NTRODUCT|ON.............. """"""""""""" 1
1,1 Project Description.. """"""'"""""""' 1
1.2 Report Organization """""""""""""' 1
2. SCENARIOS, SETTING AND STUDY AREA 5
2.1 Study Scenarios..... """"""'""""""""' 5
2.2 Project Area Roadways..'...,.......... """""""""""""'" 5
2.3 Study lntersections """"""""""""""' 5
2.4Transit """""""""""""'6
Folsom Stage Lines and Dial-A-Ride'.........'....'. """"' 5 Sacramento RegionalTransit """""""' 6
El Dorado County Transit '""""""""""'7
2.5 Bicycle Facilities """"""7
3. METHODOLOGY.........." """"""""""""" 13
3.1 Process Overview..... """""""""""" l-3
3.2 Level-of-service Methodology'.'......' """""'""""' 13 lntersection Traffic Operations Analysis.......' """"' 13
3.3 General Plan Thresholds.......'.....'.' """""""""""' 16 Level of Service ..".'.,....... ""-""""""" 16
Bicycle/PedestrianfTransit Facilitles '.' """"""""' 17
3.4 Vehicle Miles Traveled Standards of Significance""""""""" """"""""""""' 17
3.5 Analysis Tools......'..... """""""""""' 18
.........,....,.. 19
4.1 Existing Condition """' 19
Data Sources :"""""""'"""" """"""""' 19
Existing Condition lntersection and Segment Level-of-Service """""""" """"2O
4.2 Assessment of Proposed Project """"'""""""""""22
Trip Generation...........,,.- ""'"""""""'22
Trip Distribution........".."' """""""""22
CITKEAR ',(,tYl I keiJf l :r C..-- {.)' li
:1.
VII
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTransportation lmpact Study
SignalTiming and Geometry '.'."""""22
4.3 Existing 2022 with Project Conditions 23
5. PROJEgI VMT IMPACTS AND GENERAL PLAN LEVEL-OF.SERVICE CONFORMITY..........,,.,,,,,,",27 5,1Vehicle Miles Traveted......'..""..'.. .'.".."'."'.'.1.."' """"""""""""27
5.2 Conformance with General Plan Level-of-Service Policy,.....'.... .'.'.,'..""""""28
6. OTHER CONS|DERAT|ONS....",....,. .'.......'31
S.l lnternalCirculation and Site Plan Review. "'.""""31 Parking Requirements.'...'."'.....".. """"""""""""" 31- Minimum Required Throat-Depth....."......"".. """"31
Emergency Vehicle Access """"""""' 32
6.2 Bicycle/Pedestrian/Transit Facilities .'..".'........... """"""""""32
6.3 Queueing 32
6.4 Driveway Geometry.... ""..."'.""""',32
6.5 Fire Lane and lnternal Geometry.... ..."....."'.....""33
5.6 Accident History......... ."*"""""""""33
7. FINDINGS, MITIGATION, AND RECOMMENDED CONDITIONS... 3s List of Appendices
A. Traffic Counts and SignalTiming Sheets """"""""" A-1 B. Level-of-Service a nd Signal Wa rra nt Ca lculat ions B-1 C. Travet Demand ModelTrip Distribution Plots "'."""'C-1 A f KEAR','v\,'.riLke.irrr'(.r-$i'' vill
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Studv
List of Tables
Table 1. Studylntercections and Con$ol """"""""""""5
Table 2. Level-of-Service Criteria for Signalized lntercections """""""" """""""' 14 Table 3. Level-of-service criteria for unsignallzed lntersections.............. '...".'.,"' 15 Table 4. Key ttems and Sources for Geometry and Usage Data Table 5. Existing 2022 lntersection llelay and Level'of-Service Table 6. Project Trip 6eneration.'
Table 7. Baseline 2022 lntersection Delay and Level-of-Service, with and without Project'.....
List of Figures
Figure 1. Natoma Senior Apartments \liciniu Map
Figure 2. Preliminary Site Plan".."
Figure 3. Fotsom Stage Lines Routes 10, 20 and 30""""""""' Figure 4. Bike Paths, Lanes, and Routes,.
19 20
22 25
2 3
7 9
Figure 5. Sharrow
Figure 6. Class lV BikewaY...
Figure 7. Folsom Bike MaP...'.
Figure 8. Existing Condition Turn Movements and Geometry Figure 9. Project Trip Distribution ......'.....'..'.'
Figure 10. SACOG SB 743 Regional VMT Screening Map """" 10 1o
Ll
2L
24 29
5l f nfnn w\ryw.tkeartnc.com
tx
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation Impact Studv
{This page intentionally left blank)
..)' ltl' \,/t l ' : i." '5l IKEAR
x
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Study
1. INTRODUCTION
This Transportation lmpact Study (TlS) identifies impacts of the proposed Natoma Senior Apartments proiect (the Project) on the motorized and unmotorized transportation systems in Folsom, California. This study has been prepared forthe City of Folsom (City), Helix Environmental lnc., and FCC 50, LLC. A Planned Development Permit and Conditional Use Permit are requested by the applicant.
L.L Project DescriPtion
Figure 1 provides a Project vicinity map. The Project consists of 136 one- and two-bedroom affordable, age restricted, apartments located across from the main entrance to Folsom State prison at 103 E. Natoma St, Folsom, CA 95630 (parcel 071-0320-042). Two access points to East Natoma St are planned: a full access driveway aligned with Prison Rd, and a right-in-right-out driveway near the eastern edge of the Projeci site. One hundred thirty-six parking stalls are included along the drive iste along the southern and eastern edges of the Project.
Accessible pathways are planned around the building to provide a walking path for residents.
Sidewalks along the Project's East Natoma Sfeet frontage are included from Prison Rd to the edge of the existing sldewalk at Cimmaron Circle. The existing multi-use trail connection from the Oak parkway trailwill be preserved, and a pedestrian connection will be added southernly from the Project to the Oak Parkway Trail.
The site is designated Professional-Office (PO) in the General Plan and zoned as Business professional- planned Development Dlstrict (BP-PD). With the Planned Development Permit and Conditional Use permit being requested the Proiect is consistent with the adopted General Plan and zoning.
1.2 Report Organization
This report includes the following sections: lntroduction, Setting and Study Area (key roadways and intersections, regulatory setting, and analysis scenarios); Methodology (detailing the analysis procedures); analysis sections; discussion of other considerations, and findings and recommendations,
1 S f nEen w\ryw.tkearrnc.com
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmoact Studv
6 Natoma Senior Apartments 5l rrrnn
Vlcinlty Map
h,-
9 tr
o$nr+rrr
C{ty Hall
ft
di91
PROJECT
.}
E\"
i-rf'
.+
-a-*
:@.'Fa$ry@,
Figure 1. Natoma Senior Apartments Vicinity Map
""*..-*t'4rst
2Slfnfnn www.tkearrnc.com
03/28/2023 Item No.13.
Natoma Senlor Apartments Folsom,
callfornialmoact Studv
Pllt:l,lMlliARY Sr l l: Plr{N
NATOMA SENIOR
APARTMENTS
cl'tY oh'l.otsc),!l, cA
":,':':
.:i.
-*
lru;:x-uil*l&-,-* ....".,.-l
I*til$!na:-;iri+.l
v t
I
--:!" *
I,
'qb.
t.|+
Flgure 2. Prdlmlnary Slto Plrn
5 f fffan www.tkeannccom
]ros!$ -
3
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Study
(This page intentionally left blank)
\.. ,i\:la.t' 1": '.. 1.\
4Il rnrnn
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportat ion lmpact
2, SCENARIOS, SETT1NG AND STUDY AREA
The project generates fewer than 50 peak-hour trips which is the City's threshold for requiring the evaluation of project traffic on the level-of-service at potential affected intersections.
Consequently, this TIS evaluates traffic operations at the two Projed driveway intersections.
2.1 Study Scenarios
Four scenarios were identified for inclusion in this TIS through consultation with City staff. These study scenarios were used to evaluate Project impacts relevant to General Plan Policy M4.1'3 relative to level of service. This study determines the weekday AM peak-hour, PM peak-hour, and Sunday peak-hour level-of-service at study intersections under the following scenarios:
r Existing 2022 without Project condition
r Existing 2O22with Project condition
Analysis of the existing condition reflects the traffic volumes and roadway geometry at the time the study began, This scenario quantifies performance measures for the existing condition and serves as a known reference point for those familiar with the study area' These scenarios, with and without the project, identify Project related impacts anticipated to occur if the Project opened in 2020.
2,2 Project Area RoadwaYs
Brief descriptions of the key roadways serving the Project site are provided below' Natoma StlEast Natoma St is a two-lane minor arterial connecting from Folsom Blvd, past Folsom City Hall, and connecting through Green Valley Rd and onto Empire Ranch Rd. From Folsom Blvd to Fargo Way, just east of City Hall, there are sidewalks, curb, and gutter with striped class 2 bike lanes. From Fargo Way to the east, fronting the Project site and Folsom State Prison, there are dirt shoulders without sidewalks until Folsom Crossing Rd, where East Natoma Street becomes a four-lane arterialwith sidewalk, curb, gutter, and striped class 2 bike lanes to Empire Ranch Rd.
At Coloma Street, near City Hall, Natoma St caries about 11,000 vehicles per day. A volume which drops to about L0,000 vehicles per day near the Project Site' prison Rd is a two-lane north-south access road from East Natoma 5t to Folsom State Prison. lt has unpaved shoulders without bike lanes or sidewalks. Prison Road is signed to prohibit stopping or turning within the prison's property'
5l rnEan
5..,a,,iitw lkq;:lr rrc.Cct .t
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTranspo rtation lmpact Study
2.3 Study lntersections
There are two study intersections (Table 1), which are the driveway intersections show in the site plan {Figure 2) shown previously. No segments were selected for analysis' Table 1. Study Intersections and Cbntrol
Locatlon Contrcl
1. East Natoma St/Prison Rd Signal
2. East Natoma St/Eastern Project Driveway side-st reet-stop-control (sssc)
2.4 Transit
Folsom,s public transportation includes bus and dial-a-ride service provided by the City through Folsom Stage Lines and light rail seruice provided by Sacramento RegionalTransit District {SRTD)' El Dorado County Transit (EDC Transit) also provides limited bus connections to El Dorado County.
Folsom Stage Lines and Dial-A-Ride
The Folsom Stage Line buses, operated by SRTD run Monday through Friday and there is no weekend service available. There are currentlyten buses running on three routes. They are routes 10, 20 and 30 (Figure 3). Routes 10 and 20 intersect at Folsom Lake college. There is no charge to transferfrom one Folsom Stage Line route to another,
r Route 10 - Serves Historic Folsom, E. Bidwell St., the Broadstone Market Place, Broadstone plaza, Folsom Aquatics Center, Folsom Lake College, lntel, Kaiser Permanente, Folsom premium Outlets, Mercy Hospital, Palladio Mall, and CenturyTheatres. lt connects to light rail and with the RT bus service Line 24. Service with a one-hour headway starts at 5:25 AM with the last pickup at 7:25 PM.
r Route 20 - Serves Empire Ranch Road, East Natoma Slreet, Vista del Lago High School, Folsom Lake College and transfers to Route 10. There are one morning and two afternoon buses on Route 20.
e Route 30 - Serves Folsom State Prison, City Hall, and Woodmere Drive during peak-hours (5 a.m. - 8:10 a.m. and 2:35 p.m, - 4:55 p.m.) with four AM peak-period buses and five PM peak-Period buses.
Dial-A-Ride is a curb-to-curb transportation service that operates within the Folsom city limits' lt provides transportation to residents who have a physical, developmental, or mental disability.
Senior citizens who are 55 years of age or older also qualify for this program' Sacramento Regional Transit
SRTD light rail provides light rail service via the Gold Line connecting the Historic Folsom, Glenn, and lron point light rail stations to downtown Sacramento and points in between. Service is Slrnr,qn
5wt!w.lkear tr c.cot';
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Studv
provided from 5 AM to 7 pM with 30-minute headways. There is also a connection to SRTD bus route 24 from Folsom Stage Lines route 10 at the MadisonlMain stop. SRTD route 24 provides service to Sunrise Mall on an approximately hourly headway from 6 AM to 7 PM' El Dorado County Transit
The EDC Transit route 50X (the 50 Express) operates every hour from 6 AM until 7 PM Monday through Friday, with service from the Missouri Flat Transfer Center in El Dorado County to the Folsom lron Point light rail station, Folsom Lake College, dnd back' pla(a( Counlv
Sacramcno County
ga.l lldomt sL
io..-l:-
LEGEND
. erlstops
-
Bouto 10
i sctrmt
+ i.l*,sr
r Sncloral 66 glop
(D IrEn3hrPdG
t PubrE Ls.lsl
E L{H Fai gld@e
Ao{h Wayi
(,rE WDy
5 E
IE5
E
t
E
)
N
a
sf
q
tEo
I
P
t
+
I
*
d
,
\
j\t
b"v
t
I
ti
$d +J^" 6Bc
t
$I
C
I
d&
\
Figure 3. Folsom Stage Lines Routes 1O 20 and 30
2.5 Bicycle Facilities
Folsom is one of the most bike friendly settings in California, with an existing comprehensive bikeway system that is extensive and connects to a vast number of historical and recreational attractions. Existing and planned bicycle facilities within the Project area are described in the 2007 rd\*
q,
lls
li\,
7 SrrEnn w\,vw,tkean nc.conl
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact
Folsom Bikeway Master Planl which provides a framework for the design of a bikeway system that meets the California Street and Highway Code Section 890-894.2 - Bicycle Transportation Act and improves safety and convenience for all users. An updated bike plan is currently being prepared as part of the Folsom Active Transportation Plan. There are four types of bicycle facilities (Class 1, 2,3, and 4) in Folsom.
Class 1 Bike path: A bikeway physically separated from motorized vehicular traffic by an open space or barrier and either within the highway right-of-way or within an independent rlght-of-way (Figure 4).
Class 2 Bike Laner Any portion of roadway designated for bicycle use and defined by pavement marking, curbs, signs, or other traffic-control devices (Figure 4),
Class 3 Bike Route: A designated route through high demand corridors on existing streets and are usually shared with motor vehicles. Are indicated by periodic signs and do not require pavement markings (Figure 4)' A variant on Class lll bikeways, shared lanes, or "sharrow" lanes, are becoming more common, sharrows are a form of class lll bikeways where the general-purpose lane is too narrow for a bicycle and a vehicle to travel safely side-by-side within the same lane. A sharrow symbol painted (Figure 5) on the roadway is used to indicate the likely lateral location of bikes in the lane to inform motor vehicles. class 4 Bikeway (separated Bikeway or "cycle Track") The Protected Bikeways Act of 2o14 (Assembly Bill 1193 - Ting, Chapter 495) established class lV bikeways for California' Class lV bikeways provide a right-of- way designated exclusively for bicycle travel adjacent to a roadway and which are protected from vehicular traffic. Types of separation include, but are not limited to, grade separation, flexible posts, inflexible physical barriers, or on-street parking' An example is shown in Flgure 6.
Figure 7 provides a Folsom bike map. All road segments in the study area include Class 2 bike lanes. There are existing Class 1 trails paralleling the northern edge of East Natoma St (The Johnny Cash Trail, connecting Historic Folsom, Folsom Prison, and Folsom Lake). An existin6 Class ltrail also follows underneath the high voltage line behind the Project site {the oak Parkway Trail).
Grade separated bike/pedestrian tunnels take these trails under Prison Road and East Natoma l Folsom {2007) Bikeway Master Plan,
slvslgjslrl|j;t s5/e.irv lalll-&p-l>ba*:l*t:k:'tr-1r3{du4!g!$s$rilv-gl$lel-*.!stilit!' 8 A f nEnn wr,vvrit<e.:r:nc.cor-
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTranspo rtation lmpact Studv
Street. There is also a bike only left turn from eastbound East Natoma St onto the Johnny Cash Trail at the East Natoma St/Cimmaron Circle intersection.
EIKE PATH
rcoilfi.nd.{ lc-tahrku..
BIKE LANE
6. Jo$O
w}{ttltnel
oa{
BIKE ROUTE
Figure 4. Bike Paths, Lanes, and Routes
db
ilKE t l{E
ffi
9\.,lir/W LkeaatnC Ct)lY
lilOTOf
v€Hrcl.Es
OF
lrctloglzED
ElcvcEs
SlrKEAR
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTransportation lmpact Study
Figure 5. Sharrow
Figure 6. Class lV BikewaY
(source: Gary Kavanagh image L272t lg11/lflic krlplhxpSrtl) fl IKEAR www tkeartnc.cor' 10
03/28/2023 Item No.13.
Natoma Senior APartments
Transportation lmPact Study
Folsom
california
uE
a
a
t
I
a
--E:-
I
I
h.
Flgure 7. Folsom Blke MaP
51 rr<ran w!Yv/rkea'nccofr
11
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
Californialmpact StudvTransportation
(This page intentionally left blank)
ff IKEAR
. : :,.,i\j j ...:i ,t : ti. :,. 11 1 :
72
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Study
3. M ETHODOLOGY
This section provides a process overview, describes traffic forecasting, and discusses the methods/criteria used to evaluate level-of-service. Discussion of significance criteria is included.
3.1 Process Overview
The overall analysis process was structured to identifu potential adverse transportation effects related to the project and evaluate consistency with General Plan Policy M4.1'3 relative to traffic leveFof-seruice.
r Traffic volumes and turning movements for the Existing 2022 Condition were determined from observed traffic counts taken Tuesday December 7,2O2t' . Study intersection traffic operations were analyzed both with and without the proposed project to identify any anticipated inconsistencies with General Plan Policy M4.1.3 relative to traffic level of service.
o California Environmental euality Act {CEQA) impacts are based on qualitative vehicle miles of travel (VMT) analysis and significance criteria from the General Plan (Policy NCR
3.1.3), and CEqA guidance from the Governo/s Office of Planning and Research2 3.
3.2 Level-of-service Methodology
LeveFof-service {LOS) is a qualitative indication of the level of delay and congestion experienced by motorists using an intersection. Levels-of-service are designated by the letters A through F, with A being the best conditions and F being the worst (high delay and congestion). Calculation methodologies, measures of performance, and thresholds for each letter grade differ for road segments, signalized intersections, and unsignalized intersections.
Based on guidance from City staff, the following procedures described below for intersection traffic operations analysis were utilized for this TIS' Intersection Traffic Operations Analysis
Signallzed lntersFctions
The methodology from the Highway Capacity Manual (HCM) 6th Editiona, are used to analyze signalized intersections. Level-of-service can be characterized for the entire intersection, each approach, or by lane group. Control delay alone (the weighted average delay for all vehicles entering the intersection) is used to characterize leveFof-service for the entire intersection or an approach. Control delay and volume to capacity ratio are used to characterize level-of-service for lane groups. The average delay criteria used to determine the level-of-service at signalized 2 OpR (2018) Technical Advisory on Evaluating Transportation lmpacts ln CEQA, httul,l*ro,opr,qi!ssrdss.t-ag.L9gg:Zgl-:e$!id- Atl!.isury..pdt' 3 oPR's webinar on sB 743 implementation,4h6/2020'
4 Transportation Research Board (2016) Highway Capacity Manual, Washington, D.C. 5 rKsAn w\ryw tkeartnc.com
73
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
Californialmpact Study
intersections is presented in Table 2. The HCM 2010 methodology is used as the primary method' HCM 2000 methods are only utilized where the signal phasing is incompatible with HCM 2010 methods.
Table 2. Level-of-Service Criteria for Signalized lntersections level -of-
Servlce
Average DelaYr
A Low Delay: This level-of-seruice occurs when progression is ! 10.0 favorable, and most vehicles arrive during a green phase. Most vehicles do not stop at all.
B Minimal DelaYs: This leve
short cycle lengths, or both, More vehicles stop than at Los A, causing higher l-of-service generally occurs with good progression, 10.1-20.0 levels of average delaY
C Acceptable Delay: Delay increases due to only fair progression, longer cycle 20.1-35.0 lengths, or both. lndividual cycle failures {to service all woiting vehicles) may begin to appear at this level of service. The number of vehicles stopping is significant, though manY still Passthrough the intersection without stopping D Approaching Unstable/Tolerable DelaYs: The influence of congestion 35'1-55'0 becomes more noticeable. Longer delays may result from some combination of unfavorable progression, long cycle lengths, or high v/c ratios' Many vehicles stop, and the proportion of vehicles not stopping declines. lndividual cycle failures are noticeable.
E Unstable
the upper limit of acceptable delays. These high delay values generally indicate poor progression, long cycle lengths, and high vfc ratios. lndividual Operation/Signif icant Delays: This is considered by many agencies 55'1-80'0 cycle failures are frequent occurrences.
F Excessive DelaYs: This level, considered to be unacceptable to most drivers, > 80.0 or v/c >1,0often occurs with oversaturation {i.e., when arrival flow rates exceed the capacity of the intersection). lt may also occur at high v^ ratios below 1.00 with many individual cycle failures. Poor progression and long cycle lengths may atso contribute to such delay levels'
Note 1l Welghted average of delay on all aPProaches' This is the measure used by the Highway Capacity Manual to determine level-of-service, Any movement with a volume-to-capacity ratio (v/c) greater than 1'0 is considered to be level-of-service F' Source: Transportation Research Eoard (2015) Highway Capacity Manual 6th Edition, Washington D'C' U nsisnalieed lntertections
The methodoloBv from HcM oth Edition is used for the analysis of unsignalized intersections. At an unsignalized intersection, most of the main street traffic is un-delayed and, by definition, have acceptable conditions. The main street left-turn movements and the minor street movements are all susceptible to delay of varying degrees. Generally, the higher the main street traffic volumes, \:,t \,tt.il i 1 (: ;:\{', \1-..( "{it?,ffi rKEAR
t4
03/28/2023 Item No.13.
Natoma Senlor Apartments Folsom,
CaliforniaTran lmpact Study
the higher the delay for the minor movements. Separate methods are utilized for Two-Way Stop- Controlled (TWSC) i ntersections a nd Al l-Way Sto p-Co ntrol led (AWSC) inte rsections. r TWSC: The methodology for analysis of two-way stop-controlled intersections calculates . an average total delay per vehicle for each minor street movement and for the major street left-turn movements, based on the availability of adequate gaps in the main street through traffic. A level-of-service designation is assigned to individual movements or 'combinations of movements {in the case of shared lanes} babed upon delay, it is not defined for the intersection as a whole. Unsignalized intersection level-of-service is for each movement {or group of movements) based upon the respective average delay per vehicle. Table 3 presents the average delay criteria used to determine the level-of-service at TWSC and AWSC intersections'
o AWSC: At all-way stop-controlled intersections, the level-of-service is determined by the weighted average delay for all vehicles entering the intersection. The methodologies for these types of intersections calculate a single weighted average delay and leveFof-service for the intersection as a whole. The average delay criteria used to determine the levelof- service at all-way stop intersections is the same as that presented in Table 3. Level-of- service for specific movements can also be determined based on the TWSC methodology.
It is not unusual for some of the minor street movements at unsignalized intersections to have level-of-service D, E, or F conditions while the major street movements have level-of-service A, B, or C conditions. ln such a case, the minor street traffic experiences delays that can be substantial for individual minor street vehicles, but the majority of vehicles using the intersection have very little delay. Usually in such cases, the minor street traffic volumes are relatively low. lf the minor street volume is large enough, improvements to reduce the minor street delay may be justified, such as channelization, widening, or signalization.
5l rKrAR 'ai V'l \t / i.t'. a:a.{ : | : c.c a,
1, 1'
15
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Studv
Table 3. Level-of-Service Criteria for Unsicnalized lntersections Level of
Service
(Losl
Descrlption rwsgr
Average Delay
by Movement
aw5e2
lntersection Wide
Average Delay
{seconds I lseconds I vehiclel
A Little or no delay <10 <10
B Short traffic delay >10and<15 >10and<15
C Average traffic delays >15and<25 >15and<25
D Lonc traffic delaYs >25and<35 >25and<35
E Very long traffic delavs >35and<50 >35and<50
F Extreme delaYs PotentiallY affecting other > 50 (or, v/c >1.01 >50 traffic movements in the intersection
Note 1: Two-Way stop-control {TWSC) level-of-service is calculated separately for each minor street movement (or shared movement) as well as major street left turns using these criteria' Any movement with a volume to capacity ratio (v/c) greater than 1.0 is considered to be level-of- service F.
Note 2i All-Way Stop-Control (AWSC) assessment of level-of-service at the approach and intersection levels is based solely on control delay'
Sourcer Transportation Research Board (201.6) Highway Capacity Manual 6th Edition, Washington D'C, 3,3 General Plan Thresholds
Level of Service
Consistency wph General Plan level-of-service policies for the proposed Project were determined based on the methods described above and identified as either "conforming" or "non- conforming". General Plan Policy M4.1.3 addresses level of seryice:
Strive to ochieve ot teosttrafflc Level of Service "D" (or better) for local streets and roadwaysthroughoutthe city.ln designing ffansportotion improvements, the City will prioritize use of smart technologies and innovative solutions thot maximize efficiencies and safety while minimizing the physical footprint. During the course of pton buildout, it may occur thot temporclly higher levels-of-service result where roodway improvements hove not been ddequdtely phased os development proceeds. However, this situotion will be minimized bosed on annual tolfic studies and monitaring programs. Clty Stoff will report to the City Council at regulor intervsls via the Capitol lmprovement Program process for the Cauncilto prioritize projects integrol to ochieving level-of-service D or better.
The General plan Environmental lmpact Report (ElR) includes a criterion addressing potential impacts at locations that operate at level-of-service E or F under no-project conditions' Under this standard, a non-conforming situation would occur if the proposed proiect would:
5| f nfAn ,rwwtker.i:i:.csn;
16
03/28/2023 Item No.13.
Natoma Senior APartmentg Folsom,
CaliforniaTransport ation lmpact Study
lncreose the averoge delay by five seconds ot more at on intersection that currently operates (or is projected to operate) ot on unacceptoble level-of-service u nde r " no- Proiect" co nd itions.
For the purposes of this analysis, level-of-service is considered potentially non-conforming if implementation of the Pro.iect would result in any of the following:
r Cause an intersection in Folsom that currently operates (or is projected to operate) at level-of-service D or better to degrade to level-of-service E, or worse; r lncrease the average delay by five seconds or more at an intersection in Folsom that currently operates {or is projected to operate) at an unacceptable level-of-service E or F' Bicycle/Pedestria n/Transit Faci I ities
An impact is considered significant if implementation of the Project would:
o lnhibit the use of bicycle, pedestrian, or transit facilities; r Eliminate existing bicycle, pedestrian, or transit facilities; o prevent the implementation of planned bicycle, pedestrian, or transit facilities.
3.4 Vehicle Miles Traveled Standards of Significance
Under State Law (SB 7431, onJuly 1, 2020, vehicle miles traveled (VMT) will become the only metric for evaluating significant transportation impacts in environmental impact analyses required under the California Environmental Quality Act (CEQA). Without specific General Plan guidance for VMT thresholds, this analysis uses a qualitative screening against The Governors' Office of planning and Research (OPR) guidance of a !5016 per capita VMT reduction and utilizes OPR's suggested exemption for affordable housing proiects' Folsom General Plan policy NcR 3.1.3 addresses VMT, as stated below:
policy NCR 3.1.3 "Encourage efforts to reduce the amount of vehicle miles traveled (VMT).
These efforts could include encouraging mixed-use development promoting a jobslhousing balance, and encouraging alternative transportation such as walking, cycling, and public transit'"
OpR has published guidance recommending a CEQA threshold for transportation impacts of land use projects of a IS%VMT reduction per capita, relative to either city or regional averages fl IKEAR ',1, lrrW I i({}itf i na.CO iYl
17
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTransportation lmpact Studv
based on the California's Climate Scoping Plans. Qualitative assessment of VMT reduction is acceptable to screen Projects6.
Based on these criteria, a project will be considered to have a potentially significant impact if:
o per capita VMT from residential proiects is anticipated to be greater than 85% of the regional average Per capita VMT'
r The project is anticipated to inhibit implementation of planned pedestrian, bicycle, or transit imProvements'
3.5 Analysis Tools
Llvel-of-S-ervice
Control delays and level-of-service for study intersections were calculated using the Synchro 117 analysis software (Version 11.1, build 1, revision 6). synchro implements the rnethodologies of the 6th Edition of the Highway Capacity Manualto modeltraffic controls and vehicle delay.
The software requires data on road characteristics (geometric), traffic counts, and the signal timing data for each analysis intersection. ln general, default parameters were used, except in locations where specific field data are available. Heavy vehicle percentaBes of 2% were assumed during the peak hour.
VMT
ro support jurisdictions' s8743 implementation, The Sacramento Area Council of GovernmentS (SACOG) staff developed thresholds and sffeening maps for residential and office projects, using outputs from the 2016 base year travel demand model run for the 2020 Metropolitan Transportation plan/Sustainable Communities Strategies (MTP/SCS)' SACOG travel demand model is activity/tour based and is designed to estimate an individual's daily travel, accounting for land use, transportation and demographics that influence peoples'travel behaviors.
For residential projects, the threshold is defined as total household VMT per capita achieving L5% ol reduction comparing to regional {or any appropriate sub-area} average' The SACOG screening map uses "hex" geography, with each hex being about 1000feet on edge' Residential VMT per capita per hex is calculated by tallying all household VMTs, including VMT traveling outside the region, generated by the residents living at the hex and divided by the total population in the hex. Hexes are then color coded with green and blue hexes depicting neighborhoods with at least a 15% reduction in residentialvMT relative to the sAcoc region, yellow, orange, pink and red hexes have less tha n a 15% VMT reduction' s OpR (2018) Technical Advisory on Evaluating Transportation lmpacts ln CEQA, b$pflwv/ts;ru
5 OPR'S webinar on SB 743 implementation,4/t6/2A2Q'
7 h ttr:s://www. traf {'ic wate.qgttrllynrlrc-5ludis.l-'llll SlrnEnn rr\ryw tkearrnc.com
18
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Study
4. EXISTING 2022 CONDITION
This section presents the Existing condition. For purposes of this Tls, Existing conditions represent typical midweek, non-holiday, traffic volumes in 20228
4.1 Existing Condition
Data Sources
The analysis tools require a variety of data to generate the evaluation criteria. The following sections describe data collection procedures for Existing Conditions. There were three primary data elements (roadway characteristics, intersection turning movement counts, and traffic control data); and two supplementary elements (other recent studies, and field data) that comprised the data collection program for this traffic analysis' Roadruav Geometlv ald Usage Characteristicq
The geometry and usage data for the analysis were collected through aerial photographs, field visits, and prior studies. Current intersection geometry was field validated. Table 4 shows the key items included in the geometric data and the source for each item.
Table 4. Kev ltems and Sources for Geometry and Usage Data SourceKey ltem
Lane configurations and width
Lane utilization
lntersection sPacing
Length ofstorage baYs
Transit stops and routes
Aerial photographs and field visits
Prior studies, aerial photographs, and field visits
Aerial photographs and field visits
Aerial photographs and field visits
Transit schedules, aerial photographs, and field visits Turn proh ibitions or allowance Aerial photograPh s and field visits Lane configuratlons and width - These data specify the number of lanes and the width of the roadway in each direction, and the directional turns that are allowed from each lane' Lane utilization - These data specify how lanes are used by drivers, such as traffic distribution between lanes on a multi-lane roadway'
Intersection spacing - These data refer to the distance (in feet) between intersections.
Length of storage bays - These data refer to the length (in feet) of available storage for left- turning or right-turning vehicles where exclusive turn lanes are available. lt is collected for right- turn lanes when the parking lane is used as a right-turn lane' s Traffic Counts were collected on Tuesday December 7 ,2A21 S rKtAR ,r,tw l{ea}.rf 1i.to''1r
L9
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTra lmpact Study
Transit stops and routes - A transit stop is an area where passengers await, board, alight, and transfer between transit vehicles. A transit route is the roadway that transit vehicles operate on.
Turn prohibitions or allowance - These data specify if right turns on red (RTOR) are allowed on the roadway,
lntersection Tsrnins Movement Counts
Existing morning and evening peak-period vehicle and pedestrian turning movement counts were collected at study intersections on Tuesday December 7,2027' Traffic count data sheets are provided in Appendix A of this TlS. Peak-hour traffic counts were used to conduct the intersection level-of-service analysis. Turning movement counts at consecutive intersections were balanced and adjusted where appropriate to conservatively reflect existing traffic flows. Observed intersection peak hour factors (PHF) were applied. Figure 8 provides a summary of the intersection lane geometry and peak-period turning movements under Existing Conditions As well as Project traffic and Existing Plus Project conditions).
Existing Condition lntersection and Segment Level-of-Service Table 5 presents a summary of level-of-service results for the study intersections under Existing Conditions, along with 957o eueue lengths for left turns. All study intersections operate at level- of-service A or better during the AM, PM, and Sunday peak hours. Calculation sheets for intersection delay and level-of-service are provided in Appendix B. Left turn queues are adequately accommodated by the existing left turn storage pockets' Table 5 2022 Intersection and Level-of-Service
'SSSC = Side Street StoP control
\.j\ry\^; t,
<t'ljl tl\l: C.,-ji1.1
Control
No ProJect {Delay and
level-of-Servke)
AM I prta
lntersectlon
9.1 ASicnal 9.3 AE Natoma St/Prison Rd
nlasssc n/a
Eastern Project
Driveway
ilo Prdect
95% Queues {Feet)
AM I pr,rr
Approachlntersectaon
30'L73'EB Left
nla ^/aWB Left
49'22'SB Left
nlan/aNB Left
E Natoma St/Prison Rd
n/aNB nla
Eastern Proiect
Driveway
fl rnren
20
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTrans lmpact Study
6 Natoma Senior APPartments 5l rnrnn
2022 Volume, Control & GeometrY
2022
No Project
Project Only
2022
Plus Profect
AM(PM} I
Figure 8. Existing Condition Turn Movements and Geometry.
I taSIX,,
'i---i
].:j:
i]l:bi:i{i: ..- 'i: i r-:
::::i
-
601i393t
I .iri: :iai{i,':,.: :;l
4 :li'I
:i;a:
I
I
!
\ 6416!
537{387i
: :,<i ali:ia,i\ri:;i
!.lill:2.r1 -/
.i- /(.1tj'tl
o
N@-
dgNO
u;.:;J:a1:
:iri
-
8{l1l
(
.;5(5 )
+ts)T
o
t
!,:'l
i: al ::
0t0t
L otot
f Btlli
i :1:i :li::'.I:': i;'
. lz
- :-. :i
..,1 9--P
'.* --6
.:: =>a: >
{
i!
o
L.-r a,) i::'
lL
,i
aot -/
4(5) -_
a(51 \
_ 609{404t
t :\; |t.;inr!1, rl
lj, i r:,tr:il
It r \
o
(1l
:::.:
d
ll
ir
di
i r,:, i.l:::ir,ra.l >:
13g122i )
3g 1 1494)
-4(5r \
o
64(61
-\- 53713971
/'A\11).t-
l.
5l rnran !v!vwrkea.nccorl
2t
03/28/2023 Item No.13.
Natoma Senior Apartments Folsom,
CaliforniaTransportation lmpact Study
4.2 Assessment of ProPosed Project
Trip Generation
projected traffic generated by the proposed Project was calculated using trip generation factors from the lnstitute of Transportation Engineers (lTE) Trip Generation Manual, 1lth Edition (202L1, and is provided in Table 5 below.
Table 5. Project TriP Generation
Source: ITE (2021) Trip Generation Manual, lnstitute of Transportation Engineers, Washington DC (Higher value of either the average rate or the fitted eguation-based rate for peak hour of generator).
Trip Distribution
Trip distribution was based on observed traffic counts and select zone analysis within the travel demand model. New Project trips were distributed as follows:
c 48%tofirom the west on East Natoma Street
o 48% tofrom the east on East Natoma Street
o 4Yotoffrom the north via Prison Road
Project trip assignment is shown in Figure 9.
Signal Timing and Geometry
With the addition of a fourth leg to the East Natoma St/Prison Rd intersection, the signal timing and lane geometry was assumed to be configured as follows:
o Eastbound: An eastbound right turn pocket was assumed with 150-feet of storage and a 5o-foot taper; for a total of one left, one through, and one right turn lane. r Westbound: A westbound left turn lane with 100-foot pocket plus 5O-foot taper for a total of one left and one shared through-right lane.
r Southbound; The existing exclusive right-turn lane is assumed to be restriped as a through-right turn lane (for a total of one left and one shared through-right)' r Northbound: The northbound approach is assumed to provide one left and one shared through-right lane. The northbound through-right lane is assumed to be in a 70' turn pocket Plus 60'taPer.
o Timingl Eastbound and westbound protected left turn phasing, northbound and southbound split phasing. 150 second cycle lengh, with 34 second northbound southbound split phases and 20 second eastbound and westbound protected phases, and WWW 'lX€.ni inC.aOlI
Land Usc
I'E
Cate8ory QuanttY Data Dally AM Peak hour PM Peakhour
Total lnbound Outbound Total lnbound Outbound
Senior Adult Housing
(MultifamilY) 2s2
136
dwelling
units
Rate 3.24 0,29 45% 35o/o 0,3 54Yo 46%
Trips 447 39 L7 22 4t 22 19
SlrnEan
22
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
Californialmpact Study
62 second eastbound and westbound through phases. Crosswalks are assumed across all legs of the intersection with flashing don't walk phases set to 22 seconds to accommodate a 3 feet per seconding walking speed.
City staff have noted that the East Natoma St/Prison Rd intersection may be an excellent location for protected-permissive left-turn phasing {i.e., "a flashing yellow arrow" to allow left turns during the conflicting through phase). Such phasing would increase the intersection capacity and reduce queuing for the eastbound through movement. lt is our professional judgement that novel phasing plans, such as protected-permissive phasing, have the potentialto confuse elderly drivers and pedestrians, resulting in increased accident rates. Because protected-permissive phasing is not necessary to maintain the General Plan level-of-service goals we do not recommend it forthe entrance to age-restricted housing. The project adds a fourth leg to the existing T-intersection, which requires upgrading the traffic signal hardware. At the discretion of the City Engineer, those upgrades may include video vehicle detection, connecting the signal into the City traffic management centet and traffic signal controller upgrades to the satisfaction of the City Engineer' The eastern proiect driveway was assumed to be configured as right-in-right-out. Because there are fewer than ten peak,hour vehicle trips anticlpated to enter the Project via the eastern driveway, no deceleration lane or taper is necessary'
4.3 Existing 2022 with Proiect Conditions
project peak-hour traffic was added to the Existing 2022 turning volumes at each intersection.
Delay and level-of-service were determined at the study intersections. Figure 8 summarized the turning movements and lane configurations for the Existing with Proiect Condition. Table 7 presents a summary of level-of-service results for the study intersections under Existing Conditions. Allstudy intersectaons operate at level-of-service B or better during the AM, PM, and Sunday peak hours. Calcutation sheets for intersection delay and leveFof-service are provided in Appendix B, Left turn queues are adequately accommodated by the existing left turn storage pockets.
5l rKEAR wwvtrkear nc.curr
23
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportat ion lmpact Study
6 Natoma Senior Apartrnents 5 rnran
Project Trlp Dlstrlbutlon MaP
,n fOgOm
@ rirY * ad;
.:4Cn&!Arlo
.6:6 G
J
Figure 9. Project Trlp Dbtribution
Clty Hall
ft A
4ro
11 """"
&bw(atrtfur
fitae ylrt
- |i 4olo
Sh\
t cFlt
rrnts$tnl1
^4rf8%
PROJECT
s,4
'o"
..-""
5l ff<Eqn wwwtkearnc.corn
24
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Studv
Table 7. Baseline 2022 lntersection Delay and Level-of-Service, with and without Proiect lntersectlon Control
No Prolect (Delay and
Level-of-Sewlce)
AM I Pur
Wth Prolect (Delayand
level-of-Servlce]
AM I prrr
E Natoma St/Prison Rd Sienal 9.3 A 9.1 A 1s.9 B 76.7 B
Eastern Project
Driveway sssc nla n/a
10.6 B
(NB)
12.3 B
(NB}
lntersectlon Approach
No Project
95% Queues {Feetl
AM I Pr.a
Wlth Prolect
95% Queuei (Feetl
AM I Pr"r
E Natoma St/Prison Rd
EB Left !73' 30' 166' 37'
WB LEft nla nla 22' 23'
SB Left 22 49', 23', 73'
NB LEft nla nla 27' 27'
Eastern Project
Driveway NB n/a n/a 0 0
'SSSC = Side Street Stop Control
n rKrAR \,,j \../,.t,t', t {}; i I rtc i:.1) 1 1
25
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Study
a
(This page intentionally left blank)
fl IKFAR ,/y\3vl i tcilr; ta- c.ri i-l
26
03/28/2023 Item No.13.
Folsom Corporate Center Apartments
Transportation lmpact Studv
5, PROJECT VMT IMPACTS AND GENERAL PLAN LEVEL-OF-SERVICE
CONFORMITY
5.1 Vehicle Miles Traveled
Folsom General Plan policy NCR 3.1.3 addressed vehicle miles traveled (VMT) as shown below:
policy NCR 3.1.3 "Encourage efforts to reduce the amount of vehicle miles traveled (VMT).
These efforts could include encouraging mixed-use development promoting a jobs/housing balance, and, encouraging alternative transportation such as walking, cycling, and public transit."
The Governors' Office of Planning and Research (OPR) has published guidance recommending a CEQA threshold for transportation impacts of land use projects of a tSYo VMT reduction per capita, relative to either city or regional averages, based on the California's Climate Scoping Plane. Qualitative assessment of VMT reduction is acceptable to screen proiectslo.
Under State Law {SB 743), VMT became the only CEQA threshold of significance for transportation impacts on July t,2OZA. Without specific General Plan guidance for VMT thresholds, this analysis uses qualitative screening against OPR's guidance of a 15% per capita VMT reduction.
To support jurisdictions'SB743 implementation, SACOG developed thresholds and screening maps (Figure 10) for residential projectsll, using outputs from the 2016 base year travel demand model run for the 2020 MTP/SCS. SACOG's travel demand model is activity/tour based and is designed to estimate an individual's daily travel, accounting for land use, transportation and demographics that influence peoples'travel behaviors. For residential projects, the threshold is defined as total household VMT per capita achieving 15% of reduction compared to regional {or any appropriate sub-area) average VMT. The map uses HEX geography. Residential VMT per capita per HEX is calculated by tallying all household VMTs, including VMT traveling outside the region, generated by the residents living at the HEX and divided by the total population in the HEX. Green hexagons denote areas where residentialVMT is 50% to 85o/o of the regional average and yellow hexagons denote areas where residentialVMT is 85016to tOOYo of the regional average.
The project is located within one of the green hexagons with average residential VMT of 17 miles per capita {per day). The Project is anticipated to generate less than 82% of the regional e OpR {2018) Technical Advisory on Evaluating Transportation lmpacts ln CEQA, Xllp/larvvr.qslcl"cs-vLdss:l20fgqfa il.+-3*-IetLrr:jsa!-Advisqnrpdt' 10 oPR's webinar on SB 743 implementation, a/16/202A'
11 SACOG ( 2 02 1 ) h t t rrs : /l s b 74 3 - s
"1lof"qpgfd4!d44g$' c-olrl
Folsom,
California
6rnren wWW lkeannc.com
27
03/28/2023 Item No.13.
Folsom Cotporate Center Apartments
Transportation lmpact Study
per capita residential daily VMT of 20.82 miles. The Prolect is therefore anticipated to have a less-than-signifi cant impact on VMT.
5.2 Conformance with General Plan Level-of-Service Policy All study intersections are anticipated to operate at level-of-service B or better under all study scenarios, both w1h and without the addition of Project traffic. The Project is not anticipated to create new level-of-service deficiencies, or to or worsen any existing deficiencies, based on General Plan PolicY M4.1.3.
Folsom,
California
5l rnEan www tkearrnc.cotn
28
03/28/2023 Item No.13.
Folsom Corporate Centel Apartments Folsom,
CaliforniaTransportation lmpact Study
iddr*d$tl
o
+ A A tl " s, r,4orP..r"!<o{ ! 'i ': ?:: '
F.' :f 5(crrrAL cq..ts. rnrlrnnb ts d.hnd
ar ldllrur.tiE vdr E' (tdlt:.h!!hq
lsc. trdrctsm c4nr..ns tp t.qhol(q rnr
aNren:r. rlb .r..).Yrr.e! th?
^r,
ler
tF! ryqr.rhr iradeno.r vnt !fl aF,r F
x€r { .ildr.t.j br r.l!,.r rrr &urrbrd ?fr..
l.aui.q'rxt Lrydl.9 o,tr& ln. tB'on,
g.nebt., oy h. Frl&.ltfirrng.t ft. ts€\.{d
d'vid.d by dr{ iobtFPt.&tr,n lt. Hl!
tlit.li.ltttr!r E. q.tt!.!a.^rrtL :l
lusr cn. otrhr 6rnv 6r.0r FoJ.dr.r. rsbls
lo *hcn rn.rrr;n9 rt.s6tlian !Fts(rr unr.,
.rq!, esi6( ro 5! trr qad;no.rry. e*
j-!--*:-,.r . .i *.ndrtu
r!<Fi.rl9!B&. ir..t[ Oert il@ d'.n
m.pr.re tr.nd.d t.r t.lorn:don ?utts*! q'ry
lnd.r.loble.tlo.ntrgo r!.oc.,rorrP
cn.ng.r.r gil!.tnrr tr€ [email protected] ti
:1.!'.!::'r il .j.e-rr-,e..
'-rrrrJr:reaL\at:
15 -,'. i-!: - !t":;'-a-!r,,;;J f, !:
|wndd v{ ldudnr o!g* lhan4b
vW !r reS EHFBllUdrd 5/8rl)
AYq id6N WIF OFtr
| -ma**-.rmor
n s*atiotkbdksv
<.6*16ol&rdl^sdf
t
$ "ttt*t*ot*t***
I , tqdr4drtudf
Figure 10. SACOG SB ?43 Reglonal VMT Screenlng Map
{
29
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTranspo rtation lmpact StudY
(This page intentionally left blank)
SlrKrAR ,,, 1Vl :'\\.|it iFr , I rl
30
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
Californialmpact Study
6. OTHER CONSIDERATIONS
6.1 lnternal Ctrculation and Site Plan Review
This section reviews parking, driveway throat-depth, and emergency vehicle access shown on the preliminary site plan shown in Figure 2 (page 3).
Parking Requirements
The C1y does not have an adopted parking standard for age-restricted (senior) multi-family housing or affordable age-restricted multi-family housing. With a Planned Development (PD), parking supply is established through the PD permit process' proposed Project Parking: Proposed Parking consists of 135 spaces (1.00 parking spaces per unit). This exceeds that of many other recently approved age restricted multi-family projects in and around Folsom. The 135 spaces include 8 accessible spaces (i.e., with the adiacent space striped out to provide vehicle access for wheelchairs and/or mobility scooters) and 74 spaces with electric vehicle charging'
parklng Demand: The ITE Parking Generation Manuall2 lists an average peak parking demand of
0.59 vehicles per dwelling unit for Land Use 252 (Senior Adult Housing-Attached), with a standard deviation of g.!2.The ITE sample size is small (three obseruations), yet the proposed parking ratio of 1..00 is more than 3.5 standard deviations greater than the mean parking demand.
Consequently, the proposed parking for the Project is sufficient to meet the anticipated parking demand with a parking ratio of 1.00.
For comparison, Revel Senior Living, a similar project approved by Folsom in 2018 had a parking ratio of 0.81 spaces per dwelling unit. The Revel project conducted a parking survey of six similar Sagamento area facilities. All six facilities were found to use less than 0.60 spaces per dwelling unit during peak parking demand hours (consistent with the ITE parking demand data referenced above.)
Finding: The proposed parking supply of 136 spaces is adequate for the 136 multi-family units proposed in the Project.
M inimum Required Throat-DePth
Minimum Required Throat-Depth (MRTDI: For an 81-150 unit apartment complex, the standard forthe MRTD is 50 feet13. This So-foot length represents vehicle storage equivalents, which means the total required length may be achieved by summlng the throat depths for several access points if more than one access point is to serve the site.
Throat-Depth Provided: As shown on the preliminary site plan in Flgure 2 {page 3), the throat depths for the primary and second driveways exceed 50 feet and 25 feet, respectively. 12 ITE (2010) parking Generation 4th Edition, lnstitute of Transportation Engineers, Washington DC. 13 Folsom (2020) Design and Procedures Manual and lmprovement Standards, site access Table 12-1, !$CI:Jlttyy$rJs_bsaneJd6l{( Exl f ileb a n h/ blq, lrd! qa!!s-l@' S f nEnn wwwtkearrnc.com
31
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmoact Studv
Finding: The MRTD of the project driveways meet the standard because the primary drlveway throat depth meets the minimum standard of 50 feet'
Emergency Vehicle Access
The project,s internal drive isles are designed with minimum 25-foot inner and 50-foot turning radii to accommodate fire department access'
Finding: Emergency vehicle access is designed consistent with standards and is adequate.
6.2 Bicycle/Pedestrian/Transit Facilities
The project does not inhibit the use of bicycle or pedestrian facilities; eliminate existing bicycle, or pedestrian facilities; or prevent the implementation of planned bicycle, or pedestrian facilities. The project includes accessible pathways around the building to provide a walking path for residents. path connections are planned to paths internal to the Project site, south to the Oak parkway Trail, and west to the East Natoma St underpass to the Johnny Cash Trail.
Finding: The project has a less-than-significant impact on pedestrians and bicycles' With relocation of the effected bus stop, transit impacts will be less-than-signiflcant'
6.3 Queueing
Anticipated 9sth-percentile left turn queue lengths were reviewed and are anticipated to be less than the supplied storage lengths in the turn bays'
Finding: Existingturn pockets are adequate'
6,4 Driveway GeometrY
City standards requires a 60-foot right turn taper in conditions with ten or more peak-hour right turns into a driveway, and a 150-foot pocket plus 50-foot taper, with 50 or more peak-hour right turns. Neither project driveway is anticipated to have ten or more right turning vehicles into the project during the AM or PM peak-hours. The main driveway at the signalized East Natoma Street/prison Rd intersection includes an eastbound right turn pocket and a westbound left turn pocket accessing the Project, these are adequate to safely accommodate Project traffic without hindering existing traffic.
The secondary (eastern) driveway is restricted to right-in-right-out movements and is anticipated to only have fewer than ten eastbound right-turns into the Project during either the AM or PM peak hours. No turn pockets are necessary, The eastern driveway should be channelized to restrict left turns from entering or existing the Project via the eastern driveway. such channelization may be accomplished by either a triangular island located within the driveway, or by extending the raised median at the East Natoma st/cimmaron cir intersection west-word across the eastern Project drivewaY'
Finding: Drivewaygeometry has been determined to be adequate,leftturns atthe eastern Proiect driveway should be restricted through the use of channelization. 5l f fEnn w\ryw,tkearrnc'corn
32
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportati on lmpact Studv
6.5 Fire Lane and lnternal Geometry
The project proposes two access points connected by a fire lane which circles the back of the proposed apartments. All internal radii have at least a 25' inner radius and S0'outer radius per City requirements.
6.6 Accident History
potential geometric constraints and safety issues were evaluatedn including driveway spacing, sight triangles, and Statewide lntegrated Traffic Records System (SWITRS) collision data' Driveway spacing, throat depth, and corner sight distance are all adequate. ln the last five years, there have been three accidents proximate to the Project site including:
r One eastbound rear-end collection at the existing traffic light, r Two driving underthe influence (DUl) accidents (one a sideswipe, and the other a single vehicle overturn.)
These are not accident varieties that would be anticipated to be worsened by the Proiect, and the project does not require any project specific traffic safety treatments. r,,r\iirl/ lkei.j rr nc clf t5l rKEAR
33
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportatio n Impact Study
(This page intentionally left blank)
5l IKEAR .,.,_,,'! l /:,,{t :t t, 1'
34
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportation lmpact Studv
7. FINDINGS, MITIGATION, AND RFCOMMENDED CONDITIONS
Finding 1 (Trip Generation|: The Project is anticipated to generate 441 daily vehicle trips including 39 AM peak-hour vehicle trips, and 41 PM peak-hour vehicle trips. Fewer than 50 peak-hour project trips are projected to pass through any intersection.
Finding 2 (Level-of-service): All study intersections are anticipated to operate at level-of-service B or better under all study scenarios. The Project is not projected to create new deficiencies or worsen existing traffic level-of-service, pursuant to General Plan Policy M4.1.3. lmpacts to level- of-service are considered less than significant'
Finding 3 {Vehicle Miles Traveledf : Per capita Project VMT is projected to be at least 15% less than regional per capita VMT. Project VMT impacts are considered less than significant.
Finding 4 (parkingl: The proposed parkinB supply of 136 spaces (1.00 spaces per unit). The Project was found to be adequately parked with either parking ratio.
Finding 5 (Minimum Required Throat Depth): The standards for driveway throat depths are met' Finding 5 (Emergency Vehicle Accessf : Emergency vehicle access is adequate.
Finding 7 (pedestrian and Bicycle): The Project does not result in impacts to pedestrian and bicycle facilities. lmpacts to pedestrian and bicycle facilities are considered less than significant.
Finding 8 (Transit): The ProJect does not result in impacts to transit facilities. lmpacts to transit facilities are considered less than significant'
Flnding 9 (Driveway Geometry): Proposed geometry for access to East Natoma St is adequate.
Either a raised median or right-turn channelization should be used to limit the secondary (eastern) driveway to right-in-right-out access. Note that the secondary {eastern) driveway was modeled assuming a shared eastbound through-right turn lane, without a right turn taper or deceleration lane. Anticipated eastbound right turning volume is less than 10 vehicles during the AM and PM peak-hours and neither a right tapper or deceleration lane is required per City of Folsom policy.
However, the City reserves the right to require either a taper or pocket at the discretion of the City Engineer,
Finding t0 (signal Timingl: With the addition of a fourth leg to the East Natoma St/Prison Rd intersection, the signal timing and lane geometry was assumed to be configured as follows:
r Eastbound: An eastbound right turn pocket was assumed with 150-feet of storage and a 60-foot taper; for a total of one left, one through, and one right turn lane. r Westbound: A westbound left turn lane with 100-foot pocket plus 60-foot taper for a total of one left and one shared through-right lane.
o Southbound: The existing exclusive right-turn lane is assumed to be restriped as a through-right turn lane {for a total of one left and one shared through-right). '.,llww lke.lrtt:c.cli'r5l rr<Ean
35
03/28/2023 Item No.13.
Natoma Senior APartments Folsom,
CaliforniaTransportati on lmoact Studv
r Northbound: The northbound approach is assumed to provide one left and one shared through-right lane. The northbound through-right lane is assumed to be in a 70'turn pocket Plus 50'taPer'
r Timing: Eastbound and westbound protected left turn phasing, northbound and southbound split phasing. 1.50 second cycle length, with 34 second northbound southbound split phases and 20 second eastbound and westbound protected phases, and 62 second eastbound and westbound through phases. Crosswalks are assumed across all legs of the intersection with flashing don't walk phases set to 22 seconds to accommodate a 3 feet per seconding walking speed.
City staff have noted that the East Natoma St/Prison Rd intersection may be an excellent location for protected-permissive left-turn phasing (i.e., "a flashing yellow arrow" to allow left turns during the conflicting through phase). Such phasing would increase the intersection capacity and reduce queuing for the eastbound through movement. lt is our professional judgement that novel phasing plans, such as protected-permissive phasing, have the potentlalto confuse elderly drlvers and pedestrians, resulting in increased accident rates. Because protected-permissive phasing is not necessary to maintain the General Plan level-of-service goals we do not recommend it for the entrance to age-restricted housing. The proiect adds a fourth leg to the existing T-intersection, which requires upgrading the trafflc signal hardware. At the discretion of the City Engineer, those upgrades may include video vehicle detection, connecting the signal into the City traffic management center, and traffic signal controller upgrades to the satisfaction of the City Engineer. \:( \'t Vi l\. {a, ; 1t \.' {:.C O r.SlIKEAR
36
03/28/2023 Item No.13.
Planning Commission
Vintagebenior Apartments (PN 21 -159')
January 18,2023
Attachment 23
Parking Memorandufil, dated October 17,2A22
03/28/2023 Item No.13.
II,,3 Tl^:8, $i:1]:ilJ V r
MEMORANDUM
Date: October 171h,2022 TG: 1.21286.00
To: Steven Banks, CitY of Folsom
From: Mike Swenson - TransPo GrouP
Jessica Lambert - TransPo GrouP
GC Jenifer Vangerpen - Vintage housing
Subject: Vintage Folsom - Parking Study
The following memorandum summarizes the parking demand analysis that was conducted for the proposed affordable attached senior housing development in the City of Folsom, CA. City staff iroviOeA the following comment in response to the initial site plan application. . Parking: The submitted site plan indicates that l*5 on-site parking spaces are proposed for the 136-unit senior affordable living community (l:l parking ratio). The Folsom Municipal code does npt include any specific parking requirements with regard to senior affordable apartment communities. As a resul7 a iustification for the proposed parking ratio is requested (similar proiects?). As part of the parking analysi5 please provide information on the totalnumber of employees on the proiect site at any one time. Also, will employees have designated parking spaces? Project-specific parking standards for this development can be accommodated through the Planned Development Permit
Project Description
The proposed project is located in Folsom, CA and would include development of up to 136 afforiable attaihed senior housing units with up 136 on-sile parking stalls. The prolect is proposing to provide 98 1-bedroom units and 38 2-bedroom units and would employ 3.5 fulltime employees.
Parking Requirements
The Folsom Municipal Code does not include any specific parking requirements with regard to senior affordable apartment communities, As noted in the City comments, parking requirements are established through the Planned Development Permit process. The purpose of the following analysis is to establish a parking supply for the proposed project based on similar projects and demand rates published in the ITE Parking Generation Manual. previous proposed senior adult aftached housing developments in Folsom have proposed similar parking ratios to the current proposal. Table 'l provides a summary of parking ratios for similar attached senior housing developments in the City,
12'131 113th Avenue NE, Suite 203, Kirkland, WA 98034 | 425.821 366s I tfanspQ irl I i .com
03/28/2023 Item No.13.
Table 1. Historic CltY of Foleom Senlor Attached Housing Parking Ratios Number of Unlts Total Parklng Spaces
Parklng Ratlo Supply
{sprce.runlt)Prorect Nrmo
Scholar Way Senior Housing
Avenida Folsom Senior Living
Revel Folsom
110
154
166
1'.t5
168
135
1.05 spaces/unit
1.09 spacesrunit
0.81 spaces/unit
As shown in Table 1, while not specifically affordable housing units, the parking ratlos range between 0.81 and 1.09 spaces per unit. The proposed project is within the range of similar projects in the area.
Parking Demand Forecasts
Data was collected and submitted as part of previous applications in the City. Figure 1 _ summarizes the dala that was submitted as part of the Parkrng Suruey Evaluation Revel Folsom Senior Living Community, Ubora Excellence, April 27,20181' Trblc l.l
Frclllty Nrntc lacdo TyF'
No of
Unitr
Totrl f of
Prrklng
Strllr
Prrtrd
Csr
Obetrrrd
Prling Stdl
to thlt Rrtlo
iStdlrlLtttlt)
Frrkcd Crr: to
thlti Rrtlo
(C.ru/thla)
Alri$m Carmichael IL i5l 76 49 0.J0 : I 0.12 : I
Crrclsidc ()ak$ Folsom IL 100 69 4E 0.63 : I 0,44 : I
Pe* Fohom Folsom IL 90 83 27 0.!2 : I O,l0 : t
Carpus Conrmns SasrasEnlo IL 126 il 49 0.Jl : I 0.39 : I lVindinc Canrrons Carrrichael IL 102 7E 5t 0.?6: I 0.50 : I lil Dorsdo Frtatcs Iil Dorsdo Hilk IL rl0 t5 ?l 0.65 : I 0.55 . I Rr*l Folron Folrom IL t66 !3t 0.81 : I
' tndcpcndant Living (IL)
Figure 1 On-Site Parking Summary
As shown in Figure 1, the six observed facilities had parking demand ratios less than 0.60 vehicles per dwelling unit.
Additionally, peak parking demand for the proposed proiect was evaluated based on parking rates proviaeO iri ihe ITE parking Generation UTu"J (5th Edition) for the Senior Adult Housing - Attached use. The results are shown in Table 2.
Table 2. Parking Demand 'lTE
El€m6nt
Rosid6ntlal
Unlb
Poak Parklng
Demand Rater
Pesk Psd(lng
Demand
Propo36d
Parking Supply
Excers
Parklng Stallg
Mntage Affordable
Senior Housing2
136 0.61 Per dwelling unit 83 136 +53
1. 2.
ITE avaraga raia,
- AtlechedITE
l parkingsurveyEvaluationRevelFolsomseniorLivingCommunily,UboraExcellence'Apnl27,2O18 2E"tf
fii
03/28/2023 Item No.13.
As shown in Table 2, the ITE average parking demand rate of 0.61 stalls per units results in an "nti"iput"O
peak parking demand oi83 vehicles and could be accommodated in the proposed "rppty
of tie staits with-a surplus of approximately 53 stalls. Ttre ITE demand rate is also cohiiitent with the rate observed as part of the Revel Folsom Parking Study. Table 2 demonstrates that there is adequate parking for the proposed senior housing project considering ni parXing demand rates. Additionaily, affordable housing developments typically result.in lower pa*ing ae'manO rates than market rati developments; therefore, the resulting analysis should be considered conservative.
Summary/Justification
The proposed projectwould develop 136 affordable attached senior housing units with up 136 on- site far*tng stdl6. fne resulting paifing demand ratio of 1:'1 stalls per unit is consistent with previousty-approved developmlnts in the area. Additionally, as identified in this analysis, the 'ptopo*Jptbject is projected to have adequate parking supply to accommodate the peak parking demand.
3 fif
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachrnent 24
Parking Case Study, dated January 3,2023
03/28/2023 Item No.13.
VINTAGE SENIOR APARTMENTS
PARKING DEMAND CASE STUDY ANALVSIS
January ?,2023
Vintage Housing has requested their property management company, FPI Management, to perform case study of real time review of parking demand at seven existing Vintage owned Senior Apartment communities that dre similarly located in suburban settings. The seven senior properties/projects are as follows:
1. Vintage at Bouquet Canyon; Santa Clarita, CA
264 Units & 181 Parking Spaces (0.69 Spaces per Unit)
l-bedroom = 182 & 2-bedroom = 82; Total Bedroom = 345 (0.52 spaces per Bedroom) Z. Vintage atThe Crossings; Reno, NV
23O Units & 175 Parking Spaces {0.76 Spaces per Unit}
1-bedroom = 140 & 2-bedroom = 90; Total Bedroom = 320 (0.55 spaces per Bedroom)
3. Vintage at Sanctuary; Reno, NV
208 Units & 100 Parking Spaces {0'48 Spaces per Unit}
Studio = 3 & 1-bedroom = 205i Total Bedroom = 208 (0.48 spaces per Bedroom)
4. Vintage at Seven Hills; Reno NV
244 Units & 244 Parking Spaces {1'0 Spaces per Unit}
1-bedroom = 70 & 2-bedroom = 1.74; Total Bedroom = 418 {0.58 spaces per Bedroom)
5. Vintage at Bennett Valley; Santa Rosa CA
189 Units & 210 Parking Spaces (1'11Spaces per Unit)
1-bedroom = 125 & 2-bedroom = 54; Total Bedroom = 253 (0.83 spaces per Bedroom)
6. Vintage at NaPa; NaPa CA
115 Units & 52 Parking Spaces (0.54 Spaces per Unit)
1-bedroom = 109 & 2-bedroom = 5; Total Bedroom = 121 (0.51 spaces per Bedroom)
7. Seasons at Laguna; Elk Grove CA
222 Units & 158 Parking Spaces (0.71 Spaces per Unit)
1-bedroom = 150 & 2-bedroom =72;Tolal Bedroom = 294 (0.54 spaces per Bedroom) property Management (Fpl) has been managing all seven properties for many years and is acutely aware of all management items of the seven properties listed above. Based on historical experience the peak demand for parking typically takes place after 8 PM. Property Management (FPl) performed a parking countonthefollowingdatesof September Lg,2122,orNovember L4,zg2z,afterthe8PM hour' Property Management (Fpl) reviewed parking demand and the projects above and reported back on the following questions:
go unused?
Attached to this letter is property Management (FPl) summary findings of Parking Demand at each of the senior Apartment Projects listed above.
Based on review of the Data for each senior Apartment projecl vintage Housing findings are as follows:
03/28/2023 Item No.13.
1. Vintage at Bouquet Canyon; Santa Clarita, CA (0.59 stalls per unit/lO'52 spaces per Bedroom) fropit was noted to have an onsite parking supply issue, not based on parking stalls being provided, however City code requires that 33 spaces (18%) be reserved by guests' Guest parking ip..", at peak demand were going underutilized. FPI working with the City to allow for the use of tire guest parking spaces for overnight parking by residents. FPI ongoinS/continual efforts of collaborating with the City and assigning and enforcing parking rules and regulations parking is adequate with no on-street parking'
2. Vintage at The Crossings; Reno, NV (0.76 stalls per unit//0'55 spaces per Bedroom) project was noted to have no onsite parking supply issues. Based on counts 10-12 spaces go unused in the peak hours. However, it was noted on street parking is allowed and up to 4 residents choose to park on the street based on the proximity of the unit to on-street parking' FPI assigns parking and manages accordingly and FPI does not report any parking demand issues.
3. Vintage at sanctuary; Reno, NV (0.48 stalls per unit//0.48 spaces per Bedroom) f roject was noted to be experiencing a lack of onsite parking supply resulting in resident parking on the adjacent streets. On-Street parking is encouraged and allowed by the City in the zoning district. Fpl does report that onsite parking is assigned, and demand is high for these parking spaces, Through Fpl continual ongoing management and enforcement of parking, residents parking both onsite and/or on-street meets the demand of the project. FPI did note that all units in this project are either Studios or l-Bedroom units'
4. Vintage at seven Hills; Reno NV {1.0 stalls per unit//0'58 spaces per Bedroom) projeit was noted to have no onsite parking supply issues. FPI assigns parking and manages accordingly and FPI does report during peak hours most if not all the parking stalls are utilized.
Fpl did identify this Senior Apartment Community does have a relatively high 2-bedroom unit mix (7t%l and based on this FPI experience the 1- to 1 parking to unit ratio works fine based on the high 2-Bedroom count.
,
5. Vintage at Bennett valley; santa Rosa CA {1.11stalls per unit//0.83 spaces per Bedroom) eroject was noted to have no resident onsite parking supply issues and during peak demand there are several parking stalls not being utilized. FPI experience is that these routinely unused parking stalls do become a bit of a nuisance as these parking stalls tend to attract non-operable vehicles that are in violation of property management rules and in rare instances require towing' FPI did note at the main entry location periodic loading and unloading is an issue that is continually managed bY PropertY management.
5. Vintage at Napa; Napa, CA {0.54 Spaces per Unit //0.51 spaces per Bedroom} project was noted to be experiencing a lack of onsite parking supply' This is resulting in residentslvisitors parking on the adjacent local streets. FPI does report that onsite parking is assigned, and demand is extremely high for these parking spaces. Through FPI continual ongoing r",irg"r"nt and enforcement of onsite parking by residents, FPI is able to manage the parking demand of the project. FPt did note that this project has a relatively high 1-Bedroom count {95% units) and if there were more 2-Bedroom units parking would need to be restricted.
7. seasons at Laguna; Elk Grove, cA {0,71 Spaces per Unit /10.54 spaces per Bedroom) project *", not"d to be experiencing a lack of onsite parking supply resulting in resident parking on the adjacent streets. On-Street parking is currently being allowed by the city' FPI does report
03/28/2023 Item No.13.
that onsite parking is assigned, and demand is high for these parking spaces. Through FPI continual ongoing management and enforcement the parking of residents both onsite and on the street meets the demand of the project. FPI did note that this property has 2 large loading areas on both the west and east side of the and ownership/management discussions have taken place and studies would indicate that an additional 20 onsite parking spaces could be provided.
Vintage Housing review, including assistance from Property Management (FPl), of both historical experience and real time data provided for the seven Case Studies includes a relatively wide range of onsite parking allocation range from the lower end of 0.48 stalls/unit (0.48 stalls/bedroom) to t'tt stall/unit (0.83 stalls/bedroom). ln this review it was noted that any parking analysis should consider both the total number of units and the actual unit mix of l-Bedroom to 2-Bedrooms. ln this review the high percentage of 1-Bedrooms could suppon a lower demand for parking ratio and a high percentage of 2- Bedrooms yielded a higher demand parking ratio. Furthermore, based on zoning districts the City's desire for allowing on-street parking should be considered.
Based on both experience and data provided to determine adequate onsite parking is provided for residents/guests/employees, doing any analysis of parking based on total number of units could be misleading as parking demand for l-bedroom and 2-bedroom can vary widely. lnstead for the purpose of this analysis we used the number of bedrooms to analyze parking demand. Based on the Data provided the average parking to bedroom ratio was 0.57 parking spaces per unit. Vintage Housing upon review of this data inquired with Property Management (FPl) should a parking ratio of 0.60 spaces per bedroom be provided for each of the six projects listed would this resolve any onsite parking demand issues. Property Management {FPl) after performing an analysis of the potential increase in number of parking spaces for six of the seven properties Property Management (FPl) indicated that the additional parking spaces onsite would meet the demand for residents/8uest /employees'
The proposed Natoma Senior Apartments being a 136-unit Senior Residential Apartment {98 1-Bedroom (72%l and 38 2-Bedrooom (28%)) and providing 136 parking spaces at ration of 1-space/1-unit or 0'78 space/bedroom provides more than the 0.60 spaces per bedroom as analyzed above. Natoma Senior Apartment parking ratio provided of 0.78 spaces/bedroom will yield an onsite parking facility that should exceed the demand of the proposed Senior Apartment complex to included residents/guests/employees'
03/28/2023 Item No.13.
VII{TAGE SENIOR APARTMEITITS
SUMMARY PARKING OEMANO CASE STUDY ANALYSIS
3-Jan-23
PROPERTY LOCATION
TOTAL
UNITS
TOTAL
PARKING
STALLS
PARKING/UNIT
RATIO S l.BED %1-AED # 2.BED %2.BED
TOTAT
SEDROOMS
PARKINCI
BEDROOM
RATIO
Uintace at Bououet Canvon Santa Clarita, C,A 264 181 0.69 1AZ 69% E2 3L% 345 0.52 /lntare at The Crosslms Rpno, NV 230 175 0.76 1{0 6L% 90 39% 320 0.55 Vintare at Sanctuarv Reno. NV 248 1m 0.48 208 7W% 0 0'6 208 0.48 /intase at Seven Hills Reno NV 244 ZM 1.00 70 29% L74 7t% 418 0.58 ulntale at Bennett Vallev Santa Rosa CA 189 zLO 1,11 L25 56% 64 34% 2s3 0.83 Ulntare at Naoa NaDa CA 115 62 0.54 109 95% 6 5% 7Zr 0.51 teasons at Laruna Elk Grove CA 222 158 0.71 150 58Yo 72 ?2% 294 0.54 Natoma Senior Aoartments Folsom cA 136 136 1.00 98 729{ 38 28% 174 0.78
03/28/2023 Item No.13.
FPI MANAGEMENT
cuLTURE GROUNDED lN H.E.A.R r.4
Parking Study
Week of: September 19,2022
Vintage at Bouquet CanYon
Santa Clarita, CA
Q: How many apartment homes and parking spaces do you have at your property? t 264 totalapartment homes
r 181total spaces = 0.69 ratio (stall/unit)
. lbedroom=182
r 2bedrooms=82
o 0.52 ratio (stalUbedroom)
Q: Do you have parking Problems
r Yes. Mostly due to city requiring 33 spaces for "guest parking"' e: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused.
r During a recent study, management counted, most if not all spaces occupied during this time period.
Q: Are your residents parking off site {on streets). For senior projects only . lt doesn't appear that residents are parking on the city streets 800 tron point Road.Folsom, California, 95630.www.fpimgt.com'PH: 916'357-5300' FX: 916-357-5312
03/28/2023 Item No.13.
FPI MANAGEMENT
CULTURE GROUNDED lN H.E.A.R.T."€
Parking Study
Week of: September 19,2422
Vintage at The Crossings
Reno, NV
Q: How many apartment homes and parking spaces do you have at your property? . 230 total apartment homes
o 175 total spaces = O.76 ratio tstall/unit)
r lbedroom=140
o 2bedrooms=90
. 0.55 ratio (stall/bedroom)
Q: Do you have parking problems
r No issues with parking. Many of our residents do not own a car. We have many services within walking distance of the property for their convenience.
Q: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused.
r Yes, we have open spaces. lt varies at different times. During a recent study, management counted 10-12 available parking spaces.
Q: Are your residents parking off site (on streets)' For senior projects only. . Approximately 3-4 residents park on the street by choice. This is not required based on frequent open parking available.
800 lron Point Road.Folsom, Galifornia, 95630.www.fpimgt.com'PH: 916-357-5300' FX: 916-357'5312
03/28/2023 Item No.13.
FPI MANAGEMENT
CULTURE GROUNDED lN H.E.A.R Iq
Parking StudY
Week of: SePtember 19,2O22
Vintage at Sanctuary
Reno, NV
e: How many apartment homes and parking spaces do you have at your property? r 208 total apartment homes
o 100 totalspaces = 0.48 ratio (stalUunit)
r Studio = 3
. lbedroom=205
. 0.48 ratio (stall/bedroom)
Q: Do you have parking Problems
r Yes. We have many seniors with cars
e: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused.
o During a recent study, management counted all parking spaces were occupied' Q: Are your residents parking off site {on streets). For senior projects only. r Yes, residents Park on the street.
g00 lron point Road.Folsom, California, 95630'www.fpimgt.com'PH: 916-357'5300' FX: 915-357-5312
03/28/2023 Item No.13.
FPI MANAGEMENT
CULTURE GRCUNDED lN H.E.A.R.r.v-
Parking Study
Week of: September 19,2O22
Vintage at Seven Hills
Reno, NV
Q: How many apartment homes and parking spaces do you have at your property? t 244totalapartmenthomes
o 244totalspaces = 1.0 ratio {stalUunit}
. lbedroom=70
. 2 bedroom=774
o 0.58 ratio (stall/bedroom)
Q: Do you have parking Problems
o No issues with parking.
e: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused.
o During a recent study, management counted most if not all parking spaces were occupied.
Q: Are your residents parking off site (on streets). For senior projects only. . No, residents do not park on the street.
800 lron point Road,Folsom, California, 95630.www.fpimgt.com'PH: 916-357-5300' FX: 916-357-5312
03/28/2023 Item No.13.
I
FPI MANAGEMENT
CULTURE GROUNDED IN H.E.A.R,T.q
Parking Study
Week of: November 14,2O22
Vintage at Bennett ValleY
Santa Rosa, CA
Q: How many apartment homes and parking spaces do you have at your property? r 189 total apartment homes
. 2L0 total spaces = 1.Il ratio (stall/unit)
o lbedroom=125
r 2bedroom=64
e 0.83 ratio (stall/bedroom)
Q: Do you have parking Problems
r Periodic loading and unloading parking violations by the Leasing office e: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused,
r During a recent study, there are a lot of open spaces near the north side of the property.
Q: Are your residents parking off site (on streets). For senior projects only . No, residents do not park on the street.
800 lron point Road.Folsom, California, 95630.www.fpimgt.com'PH: 916-357'5300' FX: 916-357'5312
03/28/2023 Item No.13.
FPI MANAGEMENT
CULTURE GROUNDED lN H.E.A.R r.q
Parking Study
Week of: November 14,2022
Vintage at Napa
Napa, CA
Q: How many apartment homes and parking spaces do you have at your property? r 115 total apartment homes
. 62 total spaces = 0.54 ratio (stall/unit)
o lbedroom=109
r 2bedrooms=5
o 0.51ratio(stalfbedroom)
Q: Do you have parking problems
r Yes, not enough parking for the number of resident cars and caregivers.
Q: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused.
j No, parking is alwaYs full.
Q: Are your residents parking off site (on streets)' For senior projects only. r Yes. Parking along side street
800 lron Point Road.Folsom, California, 95630.www.fpimgt.com.PH: 916-357-5300' FX: 916-357-5312
03/28/2023 Item No.13.
FPI MANAGEIVENT
CULTURE GROUNDED lN H.E.A.R.T.q
Parking Study
Week of: November 14,2O22
Seasons at Laguna
Elk Grove, CA
Q: How many apartment homes and parking spaces do you have at your property? o 222 totalapartment homes
o 158 total spaces = O.7l ratio (stall/unit)
. lBedroom=150
r 2 Bedroom=72
r 0.54 ratio (stalUbedroom)
Q: Do you have parking problems
o Yes, not enough parking for the number of resident cars and caregivers Q: ls your parking lot underutilized? Meaning do you have extra spots in the evening after 8 PM that go unused,
. No, parking is alwaYs full.
Q: Are your residents parking off site (on streets). For senior projects only. o Yes. Parking along side street
800 lron Point Road.Folsom, California, 95630.www,fpimgt.com.PH: 916-357-5300' FX: 916-357-5312
03/28/2023 Item No.13.
Planning Commission
Vintage Senior Apartments (PN 21-1 59)
January 18,2023
Attachment 25
lnitial Study, Mitigated Negative Declaration, and
Mitigation Monitoring and Reporting Program,
dated November, 2922 (electronic version
available for viewing at
www.folsom.ca.us/qovernme NUcommunitv-
evel NU lann -selvi curre ro
info ation
I
03/28/2023 Item No.13.
Vintoge of Folsom Senior Apqrtments
lnitiol Study/Mitigoted Negotive Declqrotion
Prepared bY,
Clty of Folgom
Communlty Developmenl DePodmenl
50 Notomo Slreei
Folsom, CA 95530
With technicol svpport from:
HELIX Envkonmenlol Plonnlng. lnc.
I1 Notomo Streei, Suite 155
Folsom, CA 95630
November 2022
03/28/2023 Item No.13.
This page intentionally left blank
03/28/2023 Item No.13.
TABLE OF CONTENTS
Section Page
1.0 |NTRODUC[ION............. """"'1
2.A PROJECT 8ACKGROUND................ "'"""""'.l
3.0 PROJECT DESCRIPTION """"""2
3.1 Project Location """"'2
3.2 Project Setting and Surrounding Land Uses 2
Project Characteristics......."........ """"""""""""2
Parking and Circulation...'.,.."".""" """"""""""" 3
Utilities....",.. """""""' 5
Sustainability Features"..... """"""' 5
Trash/Recyc1ing................ """""""' 5
Fencing and Signage """""""""""' 5
Amenities and Landscaping......'..'....' """""""""' 5
Construction and Phasing. """"""" 6
City Regulation of Urban Development...'.."....,.,..., """"""""' 6 General P1an.".,,,........ """'"""""""" 6
Zoning Ordinance.... """""""""""" 5
Other City Regulation of Urban Development.....".'.."".".' """""""""""""' 7
3.6.L. Community Development Department Standard Construction Conditions. 7
3.6.2. City of Folsom Municipal Code......."'.. """""""" 8 PRoJECTOBJECTIVES """""""9
REqUTREDAPPROVATS """""'9
PREVIOUS RELEVANT ENVIRONMENTAT ANAIYSIS............... 10
6.1 City of Folsom General Plan 10
10 3.3
3.3.1. 3.3.2.
3.3.3,
3.3.4. 3.3.5.
3.3.5. 3.4
3.s
3.5.1. 3.5.2.
3.6 4.0
5.0 6.0
7.O
6.2 Tiering
8.0 ENVTRONMENTAT FACTORS POTENTIALLY AFFECTED................. "'.""""""""""11
7.1 DETERMINATION ............'. """""" 12
ENVTRONMENTAL lNlTlAL STUDV CHECKIIST... """"""13
r. AESTHET|CS......... "."""""""""""'L4
lr. AGRICULTURE AND FORESTRY RESOURCES"'..'.'.'..... """"""'r7 ilt. AIR QUALITY """"""' 19
03/28/2023 Item No.13.
9.0 10.0
11.0 lv. BloLoGlcAL RESOURCES "..'.".""'27
v. CULTURAL RESOURCES ".'.."""""' 40
vl. ENERGY """"""""""ss
vil. GEOLOGY AND SOILS ...""."""""" 58
VIII. 6REENHOUSE GAS EMISSIONS ............63
IX. HAZARDS AND HAZARDOUS MATERIALS"."."...". ....,.,,""..'",,72 X. HYDROLOGY AND WATER QUALITY''"." ..,.,,"",",75
xl. LAND USE AND PLANN|NG........"..'... """"""""' 81
xil. MINERAL RESOURCES. """"""""" 83
xill, NolsE ,......... .",""""' 84
xrv. PoPULATION AND HOUS|NG.".,..,.....'.." """""'94
xv. PUBLIC SERV|CES..... ....'.'....'.".""" 96
XVl. RECREATION """"""' 99
xvil. TRANSPORTATION ............ """"" 100
xvl[. TRIBAL CULTURAL RESOURCES ' '".'.....,"."."""' 112 xtx. uTlLlTlEs AND SERVICE SYSTEMS """"""""""117
xx. wlLDFlRE..... """""'L27
XXI. MANDATORY FINDINGS OF SIGNIFICANCE............", .,'"'''".,.L23 MITIGATION MONITORING AND REPORTING PROGRAM... ,...,..,.,.,T27 rNlTlAL STUDY PREPARERS................. ""t27
REFERENCES ""128
li
03/28/2023 Item No.13.
1 2
3 4
5 6
7 8
9 10
LIST OF FIGURES
Vicinity Map
AerialMap
Site Plan
Architectural Rendering-View from Natoma Street North
Architectural Rendering-View from Natoma Street at Entry Arch itectu ra I Ren deri n g-View f rom Bi ke Tra i I West Architectural Rendering-View from Bike Trail East
Architectural Rendering-Site Sections
Architectural Rendering-Site Sections
Tree lmpact Plan
LIST OF TABLES
No. Title Page
Table 1. Neighboring Land Uses.".
Table 2. Summary of Project Features".'...
Table 3. City of Folsom Municipal Code Regulating Construction and Development Table 4. Sacramento Valley Air Basin - Attainment Status Table 5. Construction Criteria Pollutant and Precursor Emissions """""""""'24 ".2
..3
..8
20 Table 6. Maximum Daily Operational Emissions.".....'..."....' Table 7: On-Site Tree Designation -..'...."."..
Table 8. Tree Replacement Equivalency Table
Table22. Operational HVAC Noise
Table 23. Building Exterior Noise Levels
Table 24, Levelof-Service Criteria for Signalized lntersections Table 25. Level-of-service criteria for Unsignalized lntersections Table 26. Existing 2022 lntersection Delay and Level-of-Service T able 27 . P roiect Trip Generation'..'.'. "..'.'..
Table 28. Baseline 2022 lntersection Delay and Level-of-Service, with and without Project 24 35
38 48Table g.Previous Studies Conducted within 0.5-Mile of the APE Table 10. Previously Recorded Cultural Resources within O.S-Mile of the APE .............. """ 50 Table 11. Previously Recorded Cultural Resources within 0.5-Mile of the APE '....""....' """ 55 Table 12. Construction Energy Summary..... """""' 56
Table 13. Operational energy Summary.".. """""" 57
Table 14. Construction GHG Emissions."'.'........". """""""""""' 67 Table 15. Operational GHG Emissions .."........'.'.. """""""""""'" 67 Table 1G. City of Folsom Municipal Code Sections Regulating the Effects on Hydrology and Water Quality from Urban Development....".'.........,' """"""""""77
Table 17. Peak Discharge Rates (Downstream from the Project Site) 79 Table 18. Noise Measurement Results """""""""' 86
Table 19. PM Peak Hour Traffic Volumes """"""""87
Table 20. HVAC Condenser Noise Data (SWL dBA)
Table 21. Off-Site Traffic Noise Levels """'""""""" 90
.90
.91
101
103
105
106
LO7
llt
03/28/2023 Item No.13.
A
B
c
D
E
F
G
H
I
J
K
IIST OF APPENDICES
Figures
Rir euality Modeling Results and Greenhouse Gas Reduction Strategy Consistency Checklist Arborist Report
Biological Resource and Wetland Evaluation
Cultural Resources Assessment
Geotechnical Engineering StudY
Prelimlnary Dralnage and Storm Water Quality Report
Noise and Vibration Assessment
Transportation lmpact Study and Parking Evaluation
Tribal Cultural Resources Memorandum
Mitigation Monitoring and Reporting Program
lv
03/28/2023 Item No.13.
ACRONYMS AND ABBREVIATIONS
AB
APN
AWSC
BMP
CAA
CAAQS
CARB
cBc
CCAA
CDFW
CEQA
CESA
CHa
co
COz
CNDDB
CNEL
CNPS
CRHR
CWA
dB
dBA
DBH
DTSC
EBC
EIR
EO
EPA
EPAP
EVCS
FEMA
FESA
GHG
GWh
GWP
HFC
HVAC
ISMND
ITE
LOS
LSAA
MBTA
MHD
MLD
Assembly Bill
Assessors Parcel Number
All-Way Stop Control
Best Management Practices
Clean Air Act
California Ambient Air Quality Standards
California Air Resources Control Board
California Building Code
California Clean Air Act
California Department of Fish and Wildlife
Ca lifornia Envi ronmental Quality Act
California Endangered Species Act
Methane
Carbon Monoxide
Carbon Dioxide
Catifornia Natural Diversity Database
Community Noise Equivalent Level
California Native Plant SocietY
California Register of Historic Resources
Clean Water Act
Decibels
A-weighted Decibel
Diameter at Breast Height
Department of Toxic Substances Control
East BidwellCorridor
Environmental lmPact RePort
Executive Order
U.S. Environmental Protection Agency
Existlng plus ApProved Project
Elecffic vehicle charging station
Federal Emergency Managernent Agency
Federal Endangered SPecies Act
Greenhouse Gas Emissions
Gigawatt hours
Global Warming Potential
Hydrofluorocarbons
Heating Ventilation and Air Conditioning
I n itial Study/M itigated Negatlve Decla ration
lnstitute of Transportation Engineers
Level of Service
Lake and Streambed Alteration Agreement
Migratory Bird Treaty Act
Multi-Family High DensitY
Most Likely Descendent
03/28/2023 Item No.13.
SB
MMRP
MPH
MTP
NAAQS
NAHC
NCtC
NOX
NPDES
NRCS
NRHP
NzO
OHP
OPR
OSHA
Oa
PACE
PD
PFC
PG&E
PM
PRC
ROG
RWQCB
scs
sf
SFs
slP
SMAQMD
SMUD
ssc
sso
sTc
SWITRS
SWPPP
SWRCB
SVAB
TCR
Tt5
TNM
TWSC
UAIC
USACE
USFWS
USGS
VMT
WL
Mitigation Monitoring and Reporting Pro6ram
Miles per Hour
Metropolitan Transportation P lan
National Ambient Air Quality Standards
Native American Heritage Commission
North Central lnformation Center
Nitrogen Oxides
National Pollution Discharge Elimination System
Natural Resources Conservation Service
National Register of Historic Places
Nitrous Oxide
Office of Historic Preservation
Governo/s Office of Planning and Research
Occupational Safety and Health Administration
Ozone
Property Assessed Clean EnergY
Planned Development
Perf luorocarbons
Pacific Gas & Electric
Particulate Matter
Public Resources Code
Reactive Organic Gases
Regional Water Quality Control Board
senate Bill
Sustainable Communities Strategy
Square footfeet
Sulfur Hexafluoride
State lmplementation Plan
Sacramento Metropolitan Air Quality Management District Sacramento Municipal Utilities District
Species of Special Concern
Sanitary Sewer Overflows
Sound Transmission Class
Statewide lntegrated Traffic Records System
Stormwater Pollution Prevention Plan
State Water Resources Control Board
Sacramento ValleY Air Basin
Tribal Cultural Resources
Transportation lmPact StudY
Traffic Noise Model
Two-Way StoP Control
United Auburn lndian CommunitY
U.S. Army CorPs of Engineers
U.S. Fish and Wildlife Service
U.S. Geological SurveY
Vehicle Miles Traveled
Watch List
vl
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
1.0 INTRODUCIION
Vintage at Folsom, Lp (Applicant) proposes to develop the Vintage at Folsom Senior Apartments Project {proposed project), whictr includes construction and operation of a 135-unit, affordable senior (i.e., age- restricted) rental housing community on an estimated 4.86-acre site. The site is located at 103 East Natoma street, approximately 350-feet (ft) northeast of the intersection of Fargo Way and Natoma Street in the City of Folsom.
This lnitial Study addresses the proposed project and whether it may cause significant effects on the environment. These potential environmental effects are further evaluated to determine whether they were examined in the Folsom General Plan 2035 Environmental lmpact Report {ElR; 2018). ln particular, consistent with public Resources code (pRC) 521083.3, this lnitial study focuses on any effects on the environment which are specific to the proposed project, or to the parcels on which the project would be located, which were not analyzed as potentially significant effects in the General Plan ElR, or for which substantial new information shows that identified effects would be more significant than described in the previous ElRs. For additional information regarding the relationship between the proposed project and the previous ElRs, see Section 6 of this lnitial Study' The lnitial Study is also intended to assess whether any environmental effects of the project are susceptible to substantial reduction or avoidance by the choice of specific revisions in the project, by the impoiition of conditions, or by other means IS15152{bx2)l of the California Environmental Quality Act (C|OA) Guidelines. lf such revisions, conditions, or other means are identified, they will be identified as mitigation measures.
This tnitialstudy relies on CEQA Guidelines $15064 and 15064.4 in its determination of the significance of environmental effects. According to 515064, the finding as to whether a project may have one or more significant effects shall be based on substantial evidence in the record, and that controversy alone, without substantlal evidence of a significant effect, does not triSger the need for an ElR.
2.0 PROJECT BACKGROUND
The proposed proiect is comprised of Assessor Parcel Number (APN) 071-0320-042 in Sacramento County, California. The following proJect specific technical reports or surveys were used in preparation of this lnitial Study and are incorporated by reference:
r Biological Resources and Wetland Evaluation Letter Report by HELIX (October 2020)' e Cultural Resources Assessment by HELIX {March 2022}'
r Geotechnical Engineering Study by Youngdahl Consulting Group, lnc' {December2O2Ll. o Traffic lmpact Study by T. Kear Transportation Planning & Management, lnc. (February 2022)' o Arborist lnventory Letter Report by HELIX (March 2022)' e Air euality Assessment, Greenhouse Gas Emissions Analysis by HEIIX (April 2022). r Noise lmpact Analysis by HELIX {May 2022)'
e Tribal Consultation Record for Compliance with Assembly Bill 52 and CEQA, prepared by ECORP Consulting, lnc. (June 2022).
. preliminary Drainage and Storm Water Quality Report by TSD Engineering, lnc. {August 2022)' 1
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
3.0 PROJECT DESCRIFTION
3.1 Profecl locqlion
The project site is located at 103 East Natoma Street, approximately 350-ft northeast of the intersection of Fargo Way and Natoma Street, in the City of Folsom (City) in Sacramento County, California. The project site is approximately 4.86-acres and is identified as Assessor's Parcel Number (APN) 071-0320- 042. The project site frontage is along East Natoma Street. The site is located within Rios de los Americanos Land Grant (Mount Diablo Base and Meridian, United States Geological Survey 7.5-minute "Folsom Quadrangle"). Refer to Figure l- for the Vicinity Map, Figure 2 for the Aerial Map, and Figure 3 for the Site Plan (Note: Allfigures are located in Appendix A). The property is owned by Vintage at Folsom, LP.
3.2 Projecl Settlng qnd Surroundlng lqnd Uses
The triangle shaped project site is currently vacant and undeveloped. The project site is considered to be blue oak woodland, surrounded by urban development. Historic aerial imagery shows that the project site has changed little since 1952 and habitat types/vegetation communities in the project site include blue oak woodland and ephemeral and intermittent drainages. The site is moderately disturbed.
There is evidence of recreational use by bicycles and the site has a constructed dirt track with several constructed dirt ramps and jumps for bicycles, presumably constructed by children from the adjacent residential neighborhood. lt also has debris piles and other evidence of use by transients. The terrain in the project site and vicinity is locally flat. The elevation on the project site ranges from 350- to 370-ft above mean sea level (amsl) and has low to moderate slope from east to west.
Folsom State Prison is located immediately north of the site, along Prison Road. East of the project site is single family homes along Cimmaron Circle, and south of the project site is Pacific Gas & Electric (PG&E) powerlines, single-family homes, and duplexes. West of the project, along Fargo Way, is office space and across from Fargo way is the Folsom City Police Department.
Neighboring land uses are summarized in Table 1.
Table 1. Land Uses
Dlrectlon land Use
North Prison Folsom State Prison
East Cimmaron Ci Si Homes
South PG&E Fam Hom
West Fa Office Folsom Police rtment
3.3 Projecl Chorqcterlslics
The proposed project is a 136-unit, affordable senior (i.e., age-restricted) rental housing community with a mix of one- and two-bedroom units in a three-story building, All 136-units would be Age Restricted Senior {+60 age restricted) Affordable Apartment as defined by the State and City requirements with 14 of the units offered to seniors with incomes at or below 30 percent of area median income (AMl) and 122-units would be available to seniors with incomes at or below 60 percent 2
03/28/2023 Item No.13.
Vintage at Folsom Senior APartments ISMND
of AMl. The project site would include surfaced driveways and parking spots surrounding the proposed building to accommodate 136 parking stalls. The site would also include 28 bicycle parking spaces, landscaping, and indoor and outdoor amenities. Table 2 provides a summary of all pervious and impervious project features on the 4.86-acre site.
Table 2. Summary of Proiect Features
The proposed three-story apartment building would include 98 one-bedroom units and 38 two-bedroom units. Residential units would range from approximately 552- to 748-square feet (sf) each. Each unit would be designed with a full kitchen, living space, kitchen/dining, bathroom, laundry, and a balcony. ln- unit amenities would include dishwashers, garbage disposals, refrigerators, in-unit laundry, patios, and/or decks. Furthermore, 15 percent of the units would be set aSide for persons with disabilities.
Apartment units are planned on each of the three levels of the building and would be accessible from the hallway corridors. Entrances to the building would be located on each side of the irregularly shaped building. Maximum projected building height would be less than 34-ft with architectural elements ranging from 40-ft, 5-inches to up to 42-ft, 6-inches from grade' Community amenities would include an estimated 2,500-sf community center on the ground floor, as well as a game room, a library room, exercise room and a craft room. A leasing office, electrical room, maintenance room, and trash room would also be located on the ground floor. Additional amenities on the project site would include outdoor seating and dining areas, perimeter walkways, a bocce ball court, bike racks, picnic tables with umbrellas, outdoor barbeques/ kitchens, and 6-ft benches' Landscaped areas with various trees and shrubs would surround the parking area and the proposed building'
3.3.1. Porking ond Circulolion
primary vehicle access to the site would be from a proposed main access driveway (36-ft) on East Natoma Street, across from Prison Road. The main entrance would modify the existing three-way signalization intersection at East Natoma Street and Prison Road, into a four-way signalized intersection" An additional right only ingress/egress driveway {27-ft} would be located on the northeastern corner of 3 Proiect Feature Acreage/ Percentage ofTotal Slte
Landscape (Pervious Area) 2.378(47.69%t
Bioretention {Pervious Area} 0.045 (0.9270)
Parking Lot (lmpervious Area) L.289 (26.s2%l
Hardscape (l mpervious Area) o.3s717.34%l
Building {lmpervious Area) 0.8s2 (17.s3%)
Total 4.861(100%)
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
the project site, with no traffic signal control. The main access driveway (36-ft) would wrap around the proposed building and connect with the additional egress/ingress point. The circulation driveway would range from 27- to 36-ft wide with parking spaces on either side. Turnarounds for emergency vehicle access would have an inner turning radius of 25-ft and an outer turning radius of 50-ft.
Oak parkway Trail, a Class I Bikeway, surrounds the proJect site. This biking trail would enter the southwestern corner of the site boundary. Within the site boundary, the Oak Parkway Trail would be realigned and connected to a concrete sidewalk proposed for the project. The conrete sidewalk would extend around the southern parking area and connect to the existing Oak Parkway Trail section located south of the site borindary. The realignment would add a pedestrian connection to the existing Oak parkway Trail. Additional proposed concrete sidewalks would be located at the frontage of the project site and would provide a sidewalk extension to Cimmaron Circle and would connect to internal sidewalks proposed around the building. These concrete sidewalks would provide walking paths for residents.
The proposed project would include 136 parking spaces in asphalt paved areas surrounding the proposed building. The parking supply includes 92 standard spaces {including 37 carport parking spaces), 10 compact parking stalls, 16 standard accessible stalls, four van accessible stalls, 12 standard electric vehicle charging station (EVCS) stalls, and two loading EVCS stalls. The electric vehicle charging spaces would be approximately 10.3 percent of the total parking spaces, which meets the electric vehicle charging station requirement outlined by CalGreen (Title 24, Part 11). Proposed parking is provided at a ratio of spaces per unit of 1:1.
The total parking area square feet excluding the carport areas would be 52,525-sf. The Folsom Municipal Code (FMC, Section t7.57 c (3) Planters, Landscaping) states that tree shall be interspersed through the parking area so that in 1,5 years,40 precent of the parking lot will be in shade at high noon. ln addition, the new California Green Code requires a project's parking lot area needs to provide 50 percent shade coverage within i.5 years. Within the project site. the totalshaded area would be 26,759-sf, which is approximately 50.9 percent of the total parking lot square footage, exceeding the minimum shade requirements of the Folsom Municipal code and the california Green code.
The applicant proposes a parking supply of 136 spaces to correspond to the development being age- restricted to seniors over 60 years of age and occupied with a population that typically has fewer drivers and a lower rate of vehicle ownership compared to conventional{family) multi-family communities, The reduced parking demand of age-restricted communities is also the result of reduced household sizes occupied by residents who no longer drive vehicles or who less frequently drive vehicles. Additionally' The Folsom Municipal Code does not address specific parking standards for senior residential uses.
Formerly approved senior apartments project (for both Market Rate and Affordable) have varied from
0.81 parking stalls per unit to 1.09 parking stalls per unit.
Additionally, the Folsom Municipal Code requires one bicycle parking space for every five residential units. With 136 residential units, the project requires 27 bicycle parking spaces. Bike racks would accommodate 28 bicycle parking spaces on the eastern side of the project site, east of the proposed building.
4
03/28/2023 Item No.13.
!
vintage at Folsom Senior APa rtments ISMND
3.3.2. Utililles
proposed utilities include domestic water, sewer utilities, fire service line and fire water main, primary anisecondary electricity lines, storm drain line, telephone/cable line, and gas line. Electrical, telephone/cable, and gas lines would be connected to existing facilities within the same vicinity of the project site, on East Natoma Street. All on site sewer utilities and water utilities (fire, domestic, and inigation) are to be privately owned, operated, maintained. All public water within the site boundary *orlU U" constructed in accordance with the City of Folsom water design standards and water construction details as a condition of approval. On-site water supply would be connected to the Zone 3 Cimmaron pressure zone located off-site, On-site sewer utilities would connect with a publicly owned sewer collection system off-site. Proposed fire hydrants are located throughout the project site. Along the frontage of the site, a 1.2.5-ft public utility easement would be installed for overhead or u nderground facilities.
3.3.3. SustqinqbilltY Feolures
The project design incorporates sustainable features consistent with General Plan Goal LU 9'1 and the California Green Building Standards Code (CalGreen). The project would exceed the 2019 California Building Energy Efficiency Standards {Title 24, Part 5) by 15 percent or more. The project provides 10 percenielectiic vehicle parking spaces (14), which is consistent with CalGreen standards. Cool paving features would be incorporated in the project site such as shade trees (39'3 percent), sidewalks/patios (24.9 percent), and parking stall/trash apron (4 percent), for a total reduction of 58'2 percent' This exceeds the minimum 50 percent reduction of nonroof heat islands on the project site, A cool roof would be installed per CalGreen/California Building Code (CBC) and a solar array is proposed for the asym metrical, gabled rooft oPs'
3.3.4. Irosh/RecYcling
A City standard trash enclosure would be enclosed with a trellis cover. The trash enclosure would have refused bins for recyclables, organics, and general waste. The trash enclosure would be located in the southeastern corner of ttre project site. Additionally, a trash room would be located on the ground floor of the proposed apartment building.
3.3.5. Fencing ond Signoge
An g-ft masonry wall is proposed on the eastern side of the project site, behind the single-family residences. The masonry wall would tie into an existing wood fence that runs along the eastern boundary line. A 6-ft-tall monument sign would be placed adjacent to the main access driveway, along East Natoma Street.
3.3.6. Amenllles qnd LondscqPing
Community amenities would include an estimated 2,500-sf community center on the ground floor, as well as a game room, a library room, exercise room and a craft room' Additional amenities on the project site would include outdoor seating and dining areas, perimeter walkways, a bocce ball court, bike racks, picnic tables with umbrellas, outdoor barbeques/ kitchens, and 6-ft benches. The project is 5
03/28/2023 Item No.13.
at Folsom Senior Apartments ISMND
located just over one mile to East Bidwell and the Historic Folsom District which offers a variety of shopping centers, mercantile services, restaurants, state parks, and Light Rail Transit Access.
Landscaping would be designed to complement the buildings and make a positive contribution to the overall aesthetic of the site. The project would preserve key open space areas, including existing Oak Groves and portions of perennial creeks, through an interactive landscape design process. Within the property site,30-to 35-ft diameter shade trees, 25-ft diameter shade trees, accent trees, screen shrubs, foundation shrubs, accent shrubs, groundcovers, and bio infiltration species would be planted. Under existing conditions, the runoff from residential properties located east of the property flows onto the property site. This offsite runoff would be intercepted by proposed landscaped swales within 15-ft landscape planters along the eastern boundary of the property. This runoff would then be redirected towards East Natoma Street and would enter the public storm drain system. Additionally, eight bio- retention planters are proposed throughout the project site to manage stormwater runoff'
3.4 Conslrucllon ond Phoslng
The project would be graded and constructed in a single phase. Construction would likely begin in spring 2023 and would take approximately 18 months to complete'
3.5 City Regulolion of Urbqn Developmenl
3.5.1. General Plqn
The site is designated as professionalOffice (Po) in the Folsom 2035 General Plan' The Po designation provides for low-intensity business and professional offices that are compatible with higher-intenslty residential uses.
3.5.2. Zoning Ordinqnce
The zoning designation of the site is in the Business and Professional (BP) District. According to Section L7.Z1.3eof the Folsom MunicipalCode, the BP zoning district generally permits office building and related uses such as banks, doctor's offices, general business office, and general uses, The purpose ofa Bp zoning district is to provide an area for business and professional office and compatible related uses.
This zoning district is intended to promote a harmonious development of business and professional office areas with adjacent commercial or residential development. However, Senior citizens (Age 55+) residential complexes are considered a permitted land use within the BP zoning district upon approvalof a Conditional Use permit by the Planning Commission according to FMC Section 77.22'O3OE\' Entitlement requests for this project include a Planned Development Permit (PD) Permit and a Conditional Use permit. The purpose of the PD Permit is to allow for greater flexibility in the design of integrated developments than otherwise possible through strict application of land use regulations.
Wittr the pD permit, the project's site plan, elevations, and overall project desiSn would be evaluated, and specific development standards would be defined. A Conditional Use Permit is required to allow for development of senior apartments on the project site based on the BP PD zoning designation. 6
03/28/2023 Item No.13.
vintage at Folsom Senior Apartments ISMND
3.6 Olher Clty Regulqllon of Urbon Developmenl
3.6.1. Communily Developmenl Deporlment Stondqrd Construction Condltions The City's standard construction requirements are set forth in the City of Folsom, Community Development Standard Construction Specifications updated in July 2020. A summary of these requirements is set forth below and incorporated by reference into the project description. Copies of these documents may be reviewed at the City of Folsom, Community Development Depattment, 50 East Natoma Street, Folsom, California 95630.
The Department's standard construction specifications are required to be adhered to by any contractor constructing a public or private project within the City. lJse of Pesticides - Requires contractors to store, use, and apply a wide range of chemicals consistent with all local, state, and federal rules and regulations.
Air Pollution Control - Requires compliance with all Sacramento Metropolitan Air Quality Management District (SMAQMD) and City air pollution regulations.
Woter Pottution - Requires compliance with City water pollution regulations, including National Pollutant Discharge Elimination System (NPDES) provisions.
Noise Control - Requires that all construction work comply with the Folsom Noise Ordinance (discussed further below), and that all construction vehicles be equipped with a muffler to control sound levels.
Noturotty Occurring Asbestos - Reguires compliance with aIISMAQMD and City air pollution regulations. including preparation and implementation of an Asbestos Dust Mitigation Plan consistent with the requirements of Section 93105 of the State Government Code.
Weekend, Holiday, ond Night Work - Prohibits construction work during evening hours, or on Sunday or holidays, to reduce noise and other construction nuisance effects.
Public Convenience - Regulates traffic through the work area, operations of existing traffic signals, roadway cuts for pipelines and cable installation, effects to adjacent property owners, and notification of adjacent property owners and businesses.
Pubtic Sofety and Troffic Control- Regulates signage and other traffic safety devices through work zones.
Existing utllities - Regulates the relocation and protection of utilities.
Preservotion oJ Property - Requires preservation of trees and shrubbery and prohibits adverse effects to adjacent properry and fixtures.
Culturol Resources - Reguires that contractors stop work upon the discovery of unknown cultural or historic resources, and that an archaeologist be retained to evaluate the significance ofthe resource and to establish mitigation requirements, if necessary'
Protection of Existing lrees - Specifies measures necessary to protect both ornamental and native oak trees.
7
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Cleoring and Grubbing - Specifies protection standards for signs, mailboxes, underground structures, drainage facilities, sprinklers and lights, trees and shrubbery, and fencing. Also requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP)to control erosion and siltation of receiving waters' Reseeding - Specifies seed mixes and methods for reseeding of graded areas.
3.6.2. Clty of Folsom MuniclpolCode
The City regulates many aspects of construction and development through requirements and ordinances established in the Folsom Municipal Code. These requirements are summarized in Table 3, and hereby incorporated by reference iirto the Project Description as though fully set forth herein. Copies of these documents may be reviewed at the City of Folsom, Office of the City Clerk, 50 Natoma Street; Folsom, California 95630.
Table 3. City of Folsom MunicipalCode Regulating Construction and Development Code
Seclon
Effuctof Cde
Establishes interior and exterior noise standards that may not be exceeded within structures, including residences; establishes time periods for construction operations.
8.70 Establishes conditions and requirements for the discharge of urban pollutants and sediments to the storm-drainage system; requires preparation and implementation of Stormwater
Pollution Prevention Plans.
8.42 9.34
9.35 T2.L6
L3.26
'J,4.L9
Defines hazardous materials; requires filing of a Hazardous Material Disclosure Form by businesses that manufacture, use, or store such materials,
Establishes standards for the construction and monitoring of facilities used for the underground storage of hazardous substances, and establishes a procedure for issuance of permits for the use of these facilities.
Regulates the cutting or modification of trees, including oaks and specified other trees; requires a Tree Permit prior to cutting or modification; establishes mitigation requirements for cut or damaged trees.
Prohibits the wasteful use of water; establishes sustainable landscape requirements; defines water use restrictions.
Adopts the California Energy Code, 2019 Edition, published as Part 5, Title 24, C.C,R. to require energy efficiency standards for structures.
Code Name
Noise Control
Stormwater
Management and
Discharge Control
Hazardous
Materials
Disclosure
Underground
Storage of
Hazardous
Substances
Tree Preservation
Water
Conservation
Energy Code
8
03/28/2023 Item No.13.
vintage at Folsom Senior Apartmeots IsMND
L4.20
L4.29
L4.32
a
Green Building
Standards Code
Adopts the California Green Building Standards Code (CalGreen Code), 2019 Edition, excluding Appendix Chapters A4, A5, and A6.1 published as Part 11, Title 24, C'C.R' to promote and require the use of building concepts having a reduced negative impact or positive environmental impact and encouraging sustainable construction praclices'
Requires a grading permit prior to the initiation of any grading, excavation, fill or dredging; establishes standards, conditions, and requirements for grading, erosion control, stormwater drainage, and revegetation'
Restricts or prohibits uses that cause water or erosion hazards, orthat result in damaging increases in erosion or in flood heights; requires that uses vulnerable to floods be protected against flood damage; controls the modification of floodways; regulates activities that may increase flood damage or that could divert floodwaters.
4.0 PROJECT OBJECTIVES
The project objective is to provide affordable senior rental housing consistent with the 2035 General plan, including the Housing Element, which identifies guiding principles, goals, and policies for housing choices for all generations.
5.0 REQUIRED APPROVALS
A listing and brief description of the regulatory permits and approvals required to implement the proposed project are provided below. This lnitial Study is intended to address the environmental impacts associated with all of the following decision action and approval:
. Planned Development Permit (PD Permit);
r Conditional Use Permit {CUP}; and,
r Density Bonus.
The City of Folsom has the following discretionary powers related to the proposed project:
Adoption of the lnitialstudy, Mitigated Negative Declaration, and Mitigation Monitoring and Reporting program: The City of Folsom Planning Commission will act as the lead agency as defined by the California Environmental Quality Act (CEAA) and will have authority to determine if the lnitial Study is adequate under GEQA.
Approval of project: The City of Folsom Planning Commission will consider approval of the project and the entitlements described above,
9 Grading Code
Flood Damage
Prevention
a
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
6.0 PREVIOUS RETEVANT ENVIRONMENTAL ANALYSIS
6.t Clty of Folsom Generol Plqn
The program EIR for the City of Folsom General Plan (2018) provides relevant policy guidance for this environmental analysis, The EIR evaluated the environmental impacts that could result from implementation of the city of Folsom 2035 General Plan (2035 General Plan) (city of Folsom 2018a)' The program EIR is intended to provide information to the public and to decision makers regarding the potential effects of adoption and implementation of the 2035 General Plan, which consists of a comprehensive update of Folsom's current General Plan. The 2035 General Plan consists of a policy document, including Land Use and Circulation Diagrams'
6.2 Tlering
,,Tiering,, refers to the relationship between a program-level EIR (where long-range programmatic cumulative impacts are the focus of the environmental analysis) and subsequent environmental analyses such as the subject document, which focus primarily on issues unique to a smaller project within the larger program or plan. Through tiering a subsequent environmental analysis can incorporate, by reference, discussion that summarizes general environmental data found in the program EIR that establishes cumulative impacts and mitigation measures, the planning context, and/or the regulatory background, These broad-based issues need not be reevaluated subsequently, having been previously identified and evaluated at the program stage'
Tiering focuses the environmental review on the project-specific significant effects that were not examined in the prior environmental review, or that are susceptible to substantial reduction or avoidance by specific revisions in the project, by the imposition of conditions or by other means. Section 21093tb) of the public Resources code requires the tiering of environmental review whenever feasible, as determined bY the Lead AgencY.
ln the case of the proposed project, this lnitial Study tiers from the EIR for the Broadstone Unit No' 3 specific plan, and the EIR for the city of Folsom General Plan. The Folsom General Plan, as amended, is a project that is related to the proposed project and, pursuant to $15152{a) of the CEQA Guidelines, tiering of environmental documents is appropriate. CEQA Guidelines 515152{e} specifically provides that:
The above mentioned ElRs can be reviewed at the following location:
City of Folsom
Community Development Department
50 Natoma Street (2nd Floor)
Folsom, CA 95630
Contact: Mr. Steve Banks, Principal Planner
{915) 461-6207
10
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
7.0 ENVIRONMENTAT FACTORS POTENTIALLY
AFFECTED
The environmentalfactors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant lmpact" or "Less than Significint with Mitigation lncorporated" as indicated by the checklist on the following pages. tl Aesthetics [J Agriculture and Forestry
Resources
I Rir Quality
I siologicalResources I cultural Resources I tnergy
I eeougy and Soils I Greenhouse Gas Emissions n Hazards and Hazardous Materials
fl uydrology and water
QualitY
n Land Use and Planning f] Minerat Resources
I ruoir" I Population and Housing n Public Services
fl Recreation Transportation I rriu.t cultural Resources D Utilities and Service
Systems
n wildfire f Mandatory Findings of
Significance
11
03/28/2023 Item No.13.
Vlntage at Folsom Senior Apartments ISMND
7.1 DETERITAINATION ,
Or{ ttre basis of this initialevaluation
I find that the proposed project coulD NoT have a slgnificant effect on the environmenL and a NEGATIVE DECLARATION will be
EGATIVE DECIARATIOMITIGATED
oeffect then ehcould aave nvironment,eth significantfind that projectproposedIthough madelnslons beenhavethecesethis usebeca revrtn projecteffectnotwill abethere significant willN beNAtheor proponent.to by projectby agreed
t
I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT iS TC
lfind that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect llhas been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed'
n
to that earlier EIR or NEGATIVE DECI.ARATION, including revisions or
NEGATIVE
oneffect ethehave nvironmentcould significantthatnd thetr proposed projectIthough ln earliern orEIRnbeeeffects have adequatelyanalyzedallcause (abe significantpotentially avobeen oridedsta and haveb)to ndards,rsuantDECLARATION applicablepu further ls uired
m
themeasures that are lmm
re
P Name
Durv
t2
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
8.0 ENVIRONMENTAT INITIAL STUDY CHECKLIST
The lead agency has defined the cotumn headings in the environmental checklist as follows:
A. ,,potentially Significant lmpact" is appropriate if there is substantial evidence that an effect may be significant even with the incorporation of mitiSation. lf there are one or more "Potentially Significant lmpact" entries when the determination is made, dn EIR is required, B. ,,Less Than Significant with Mitigation lncorporated" applies where the inclusion of mitigation measures has reduced an effect from "Potentially Significant lmpact" to a "Less Than Significant lmpact." All mitigation measures are described, including a brief explanation of how the measures reduce the effect to a less than significant level. Mitigation measures from earlier analyses may be cross-referenced.
C. ,,Less Than Significant lmpact" applies where the project does not create an impact that exceeds a stated significance threshold.
D. ,,No lmpact" applies where a project does not create an impact in that cate8ory. "No lmpact" answers do not require an explanation if they are adequately supported by the information sources cited by the lead agency which show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No lmpact" answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project would not expose sensitive receptors to pollutants, based on a project specific screening analYsis).
The explanation of each issue identifies the significance criteria or threshold used to evaluate each question; and the mitigation measure identified, if any, to reduce the impact to less than significance.
Earlier analyses may be used where, pursuant to the tiering, program ElR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration ICEQA Guidelines Section 15063(cx3xD)1. where appropriate, the discussion identifies the following:
a) Earlier Analyses Used. ldentifies where earlier analyses are available for review. b) tmpacts Adequately Addressed. ldentifies which effects from the checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and states whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation Measures. For effects that are "Less Than Significant with Mitigation lncorporated," describes the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project' l-5
03/28/2023 Item No.13.
VintaSe at Folsom Senior Apartments ISMND
I. AESTHETICS
PdGntlNiy
Sltdicant
ltnptct
kre fbn
$lnlficrnt
wldr
MltlllUon
lncorpotrt d
tosslhrn
Sl8nlfrc.nt ttlo
lmptct lmPact
Except as provided in Public Resources Code Section 21099, would the project:
a) Have a substantial adverse effect on a scenic vista? L} r_l tr t b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highwaY?
n u
c) Substantially degrade the existing visual character or quality of public views of the site and its surroundings? {Public views are those that are experienced from publicly accessible vantage point), lf the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
LI n I
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the
area?
[J t1t-t I
Environmenlol Setting
The 4.g6-acre parcel proposed for development is currently vacant and undeveloped. Folsom State prison is located immediately north of the site, along Prison Road. East of the project site is single family homes along Cimmaron Circle, and south of the project site is Pacific Gas & Electric (PG&E) utility powerlines, single-family homes, and duplexes' West of the project, along Fargo Way, is office space and across from Fargo Way is the folsom City Police Department. Oak Parkway Trail is located west and south of the site, and Johnny Cash Recreation Trail is located north of the project site. The local setting is characterized by commercial development to the south and west, residential to the east and south, and institutionalto the north. Existing utility lines are located along East Natoma Street and south of the project site.
Evqluolion of Aeslhetics
a) Have a substantial adverse effect on a scenic vista? No impact. Neither the project site nor the surrounding areas are scenic vistas due to the existing nearby commercial, residential developments. Further, neither the project site, nor views to or from the project site, have been designated as important scenic resources by the City or any other public agency' Therefore, the proposed development would not interfere with or degrade a scenic vista, and no impact would occur.
14
03/28/2023 Item No.13.
c)
Vintage at Folsom Senior Apartments ISMND
b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No impact. The project site is currently vacant and undeveloped. The nearest officially designated state scenic highway is the segment of US Highway 50 from Placerville to Echo Summit, approximately 20 miles east (CalTrans ZOtg). Therefore, the project would not impact scenic resources, such as trees, rock outcroppings or historic buildings within a state scenic highway, and no impact would occur. ln non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). lf the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less than significant impact. The proposed project is located within an urbanized area of Folsom, surrounded by commercialand residential development and institutional land. The site is vacant and undeveloped, and the existing character of the site would be modified by the proposed development' The proposed project would construct a 136-unit affordable senior housing development, as well as proposed parting (bicycle and vehicle), landscape, and outdoor and indoor amenities' The apartment building roof height is 34-ft, with architectural elements ranging from 42-ft,5-inches to up to 42-ft' 6' inches above grade, and would be designed with stucco, board and batten, brick veneer, asphalt shingles, and wrought iron railing. The building would be visually compatible with the proposed landicaping throughout the project site. Please refer to Figure 4, Figure 5, Figure 5, and Figure 7 for architectu ral renderings of the proposed project site viewed from Natoma Street and the bike trail' ln order to accommodate for the change in existing character, the proposed project would implement landscape screening, site amenities, and building designs to blend the proposed project with surrounding development and screen the project from residential neighbors' Along the proposed 8-ft masonry *tll on the eaStern boundary, shade, and accent trees, as well aS several evergreen SpecieS would be planted as landscape screening. The landscape screening would be planted in order to block the sightline of homes along Cimmaron Circle and surrounding streets from the third story of the proposed building. tree heilht would range from 15- to 35-ft based on tree type and would supplement ihe existing trees in the neighboring yards. Please refer to Figure 8 and Figure 9 for architectural renderings of the proposed sightline screening. Additionally, landscaped areas with various trees and shrubs would surround the proposed building and parking area, and a bocce ball court, and outdoor seating areas would be included to add to the overall visual aesthetic. The proposed br;ilding would have asymmetricalgabled roofs to add visual interest'
The proposed proJect is consistent with types of uses envisioned and permitted in the Folsom General plan. The project is consistent with the BP zoning distric{ development standards and would be designed consistent with the City's Design Guidelines for Senior Housing Development' Entitlement requests for this project include a pianned Development permit (PD Permit) and a conditional use Permit (CUP). The Conditional Use permit is required to allow for development of a senior residential apartment community on the project site. The proposed land use is consistent with the overall suburban character and ongoing development in the vicinity and is expected to integrate into the existing and planned development of the area. The proposed project would have a less than significant impact on visual character and no mitigation is necessary.
1>
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
d) create a new source of substantial light or glare that would adversely affect day or nighttime views in the area?
Less than significant impact. The project includes a combination of free-standing, pole-mounted parking lot and walkway lights, recessed carport and elevator lights, and building-mounted lights. To minimize potential lighting-related impacts, free-standing parking lot lights and recessed carport lights would be screened, shielded, and directed downward to minimize glare towards the surrounding properties. New lighting installed with the development of the proposed project would be subject to City standard practices regarding night lighting that would be made a condition of approval of the PD Permit. The proposed units and other project features would comply with design standards outlined in the Folsom irlunicipal Code. The exterior of the proposed apartment buildings would be designed with architectural detailing that would not produce glare and would not affect day or nighttime views, and existing City standards would limit light spillover and intensity. Therefore, impacts would be less than significant, and no mltigation is necessary.
16
03/28/2023 Item No.13.
Vintage at Folsom Senior APa rtments ISMND
II. AGRICULIURE AND FORESTRY RESOURCES
Potendally
Sltnlfi€rnt
lnptct
lrsllnn
Sltdfrc.nt
Bllh
MHpnon
lncorporrted
LrsrThrn
$srnctnt tlo
lmpact lnP.ct
Would the Project:
a) convert Prime Farmland, Unique Farmland, or Farmland of Statewide lmportance (Farmland), as shown on the
maps prepared pursuant to the Farmland Mapping and
Monitoring Program of the California Resources Agency'
n n nl
to non-agricultural use?
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
n
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
Section LZZzllAll,timberland tas defined by Public
Resources Code Section 4526), or timberland zoned
Timberland Production (as defined by Government Code
li I
Section 51104(e))?
d) Result in the loss of forest land or conversion of forest n land to non-forest use?
e) lnvolve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of
forest land to non- forest use?
Environmentol Setling
No agricultural activities or timber management occur on the project site or in adjacent areas and the project site is not designated for agricultural or timberland uses. The california lmportant Farmlands Map prepared for sacram"nto co*ty by the california Resources Agency classifies the project site and surrounding area as Other Land (California Department of Conservation (CDC) 2015)' Other Land is land not included in any other mapping category. common examples include low density rural developments; brush timber, wetland, and riparian areas not suitable for livestock grazing; confined livestock, poultry or aquaculture facilities; strip mines, borrow pits; and water bodies smaller than forty acres' Vacant and non-agricultural land surrounded on all sides by urban development and greater than 40 acres is mapped as Other Land (CDC 2015)'
The Natural Resources Conservation Service {NRcS} soil survey report generated for the project site (NRCS 2020) indicates that the soil units at the site, Argonaut-Auburn complex, 3 to 8 percent slopes, and Argonaut-Auburn-Urban complex, 3 to 8 percent slopes, are not Prime Farmland' Farmland of Statewidelmportance,FarmlandofLocallmportance,orUniqueFarmland. n n n
t7
03/28/2023 Item No.13.
Vintage at Folsom seniorApartments ISMND
Evoluqllon of Agrlcullure qnd Foreslry Services
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide lmportance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
No impact. The project site is not designated as Prime Farmland, Unique Farmland, or Farmland of Statewide importance (Farmland). as indicated in the Sacramento County lmportant Farmland 2016 Map (CDC 2016). Therefore, the project would have no impact on these farmland resources. b) Conflict with existing zoning for agricultural use, or a Williainson Act contrdct? No impact. The project site is not zoned for agricultural use or a Williamson Act contract. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 7222}(ell,timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(9))? No impact. The project site is not zoned or designated as farmland, and the surrounding land uses are primarily residential developments, office space, and institutional land. Therefore, the nature and location of the project would not directly or indirectly result in the conversion of Farmland to non- agricultural uses. No impact would occur.
d) Result in the loss of forest land or conversion of forest la nd to non-forest use? OR
e) lnvolve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No impad. Because no portion of the City or the project site are zoned for forest land or timberland, no impact would occur for questions d) and e).
18
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
III. AIR QUATITY
Poierthlty
Sltnlicrnt
lmptCt
lerslhrn
Stnlfrcrrt
wllh
ilhEptol
lncorporrtcd
lcsrhan
Sltnlficrnt llo
lmpact lmp.ct
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan? n r t]
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non- attainment under an applicable federal or state ambient air quality standard?
u fl ln
c) Expose sensitive receptors to substantial pollutant
concentrations?
LI
d) Result in other emissions {such as those leading to odors) adversely affecting a substantial number of people? n u I HELTX Environmental Planning conducted air quality modeling {CalEEMod}for the proposed project based primarily on the preliminary site plan and the Transportation lmpact Study conducted by T. Kear Transportation Planning and Managem ent (2O22|. Air quality modeling output files and quantitative results are presented in Appendix B.
Environmenlol Setting
Climate in the Folsom area is characterized by hot, dry summers and cool, rainy winters, During summe/s longer daylight hours, plentifulsunshine provides the energy needed to fuel photochemical reactions between oxides of nitrogen (NOx) and reactive organic gases (ROG), which result in ozone (Or) formation. High concentrations of Os are reached in the Folsom area due to intense heat, strong and low morning inversions, greatly restricted vertical mixing during the day, and daytime subsidence that strengthens the inversion layer. The greatest pollution problem in the Folsom area is from NOx.
The City of Folsom lies within the eastern edge of the Sacramento Valley Air Basin (SVAB). The Sacramento Metropolitan Air Quality Management District (SMAQMD) is responsible for implementing emissions standards and other requirements of federal and state laws in the project area. As required by the California Clean Air Act (CCAA), SMAQMD has published various air quality planning documents as discussed below to address requirements to bring the District into compliance with the federal and state ambient air quality standards. The Air Quality Attainment Plans are incorporated into the State lmplementation Plan (SlP), which is subsequently submitted to the U.5. Environmental Protection Agency {USEPA}, the federal agency that administrates the Federal Clean Air Act of 1970, as amended in 1990.
19
03/28/2023 Item No.13.
VintaSe at Folsom Sentor Apartments ISMND
Ambient air quality is described in terms of compliance with state and national standards, and the levels of air pollutant concentrations considered safe, to protect the public health and welfare. These standards are designed to protect people most sensitive to respiratory distress, such as people with asthma, the elderly, very young children, people already weakened by other disease or illness, and persons engaged in strenuous work or exercise. The USEPA has established national ambient air quality standards (NAAAS) for seven air pollution constituents. As permitted by the Clean Air Act, California has adopted more stringent air emissions standards {California Ambient Air Quality Standards [CMQS]) and expanded the number of regulated air constituents.
The California Air Resources Board (CARB) is required to designate areas of the state as attainment, nonattainment, or unclassified for any state standard. An "attainment" designation for an area signifies that pollutant concentrations do not violate the standard for that pollutant in that area. A "nonattainment" designation indicates that a pollutant concentration violated the standard at least once. The air qualiry attainment status of the SVAB, including the City of Folsom, is shown in Table 4.
Table 4. Sacramento Valley Air Basin - Attainment Status Pollutent Feder.l Attslnment Status
Ozone No Federal Standard
0zone Nonattainment
Coarse Particulate Matter Attainment
Fine Particulate Matter Nonattainment
Carbon Monoxide
Nit Dioxide Attainme
Lead
Sulfur Dioxide Unclassified
Sulfates No Federal Standard
Sulfide No Federal Standard
Particles No Federal Standard
Sources: SMAQMD 2020
Sacramento County is designated as nonattainment for the state and federal ozone standards, the state PMro standards, and the federal PMz.s standards. Concentrations of all other pollutants meet state and federal standards.
Ozone is not emitted directly into the environment, but is generated from complex chemical reactions between ROG, or non-methane hydrocarbons, and NOx that occur in the presence of sunlight. ROG and NOx f,enerators in Sacramento County include motor vehicles, recreational boats, other transportation sources, and industrial processes. PMro and PMz.s arise from a variety of sources, including road dust, diesel exhaust, fuel combustion, tire and brake wear, construction operations, and windblown dust.
Toxic Air Gonlqmlnontg
Toxic air contaminants (TAC) are a diverse group of air pollutants that may cause or contribute to an increase in deaths or in serious illness or that may pose a present or potential hazard to human health.
TACs can cause long-term chronic health effects such as cancer, binh defects, neurological damage, asthma, bronchitis, or genetic damage, or short-term acute effects such as eye watering, respiratory irritation (a cough), runny nose, throat pain, and headaches, TACs are considered either carcinogenic or State of Cellfornla
Attalnmcnt Status
Nonattainment
Nonattainment
Nonattainment
Attainment
Attainment
Attainment
Attainment
Attainment
Attainment
Unclassified
Unclassified
20
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
noncarcinogenic based on the nature of the health effects associated with exposure to the pollutant, For carcinogenic TACs, there is no level of exposure that is considered safe and impacts are evaluated in terms of overall relative risk expressed as excess cancer cases per one million exposed individuals.
Noncarcinogenic TACs differ in that there is generally assumed to be a safe level of exposure below which no negative health impact is believed to occur, These levels are determined on a pollutant-by- pollutant basis.
The Health and Safety Code (939655[a]) defines TAC as "an air pollutant which may cause or contribute to an increase in mortality or in serious illness, or which may pose a present or potential hazard to human health." All substances that are listed as hazardous air pollutants pursuant to subsection (b) of Section 112 ofthe CAA (42 United States Code Sec. 7a12[b]) are designated as TACs. Under State law, the California Environmental Protection Agency {CalEPA}, acting through CARB, is authorized to identify a substance as a TAC if it determines the substance is an air pollutant that may cause or contribute to an increase in mortality or an increase in serious illness, or that may pose a present or potential hazard to human health.
Diesel engines emit a complex mixture of air pollutants, including both gaseous and solid material, The solid material in diesel exhaust is referred to as diesel particulate matter {DPM}. Almost all DPM is L0 microns or less in diameter, and 90 percent of DPM is less than 2.5 microns in diameter (CARB 2022).
Because of their extremely smallsize, these particles can be inhaled and eventually trapped in the bronchiai and alveolar regions of the lung. ln 1998, CARB identified DPM as a TAC based on published evidence of a relationship between diesel exhaust exposure and lung cancer and other adverse health effects. DPM has a notable effect on California's population-it is estimated that about 70 percent of total known cancer risk related to air toxics in California is attributable to DPM {CARB 2022).
Sensillve Receptors
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved and are referred to as sensitive receptors. Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers. CARB and the Office of Environmental Health Hazard Assessment (OEHHA) have identified the following groups of individuals as the most likely to be affected by air pollution:the elderly over 65, children under 14, infants (including in utero in the thlrd trimester of pregnancy), and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis (CARB 2005; OEHHA 2015).
Residential areas are considered sensitive receptors to air pollution because residents {including children and the elderly) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Children and infants are considered more susceptible to health effects of air pollution due to their immature immune systems, developing organs, and higher breathing rates. As such, schools are also considered sensitive receptors, as children are present for extended durations and engage in regular outdoor activities'
The closest existing sensitive receptors to the project site are the single-family residences that border the project site to the east and the single-family residences located approximately 100-ft south of the project site. Additionally, Vibra Hospital of Sacramento is located approximately 350-ft south of the project site. The closest schools to the project site are Theodore Judah Elementary School and Blanche Sprentz Elementary School, located approximately 1,400-ft to the southwest and 2,000-ft to the southeast, respectively.
21
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Melhodology snd AstumPlions
Criteria pollutant, precursor, and GHG emissions for project construction and operation were estimated using the California Emissions Estimator Model {CalEEMod}, Version 2O2A.4.O. CalEEMod is a statewide land use emissions computer model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutant and GHG emissions associated with both construction and operations from a variety of land use projects. The model was developed for the California Air Pollution Control Officers Association (CAPCOA) in collaboration with the California air districts. CalEEMod allows for the use of default data (e'g., emission factors, trip lengths, meteorology, source inventory) provided by the various California air districts to account for local requirements and conditions, and/or user-defined inputs. The calculation methodology and default data used in the model are available in the CalEEMod User's Guide, Appendices A, D, and E (CAPCOA 2021). The CalEEMod output files are included in Attachment A to this letter.
Construction of the project is anticipated to begin as early as January 2A23 and be completed in April 2024. Construction modeling assumes the fotlowing anticipated schedule: site preparation 10 working days; grading 87 working days; building construction 207 working days; paving 2l working days; and architectural coating 22 working days. Construction equipment assumptions were based on estimates from calEEMod defaults. The project would not require an import or export of soil during construction activities. Construction emissions modeling assumes implementation of basic dust control practices (watering exposed areas twice per day)to comply with the requirements of: SMAQMD Rule 403, Fugitive Dust.
Operational mobile emissions were modeled using the project trip generation of 441 average daily trips from the project Transportation lmpact Study (T. Kear Transportation Planning and Management, lnc. 2O2Zl. Operational emissions resulting from energy use, water use, and solid waste generation were modeled using calEEMod defaults with an added 20 percent reduction in water use to account forthe requirementr of tt "
2019 CALGreen, and an additional 25 percent solid waste diversion to account for AB 341 requirements.
Stqndqrds ol Slgniflconce
While the final determination of whether or not a project has a signifiiant effect is within the purview of the lead agency pursuant to CEQA Guidelines Section 15064(b), SMAQMD recommends that its air pollution thresholds be used to determine the significance of project emissions. The criteria pollutant thresholds and various assessment recommendations are contained in SMAQMD's Guide to Air QuoliV Assessrnenf in Sacrsmento County (CEQA Guide; 2020, revised), and are discussed under the checklist questions below.
Evoluollon of Ah QuolltY
a) Conflict with or obstruct implementation of the applicable air quality plan? Less than Significant lmpact. ln accordance with SMAQMD's Guide, construction-generated NOX, PM10, and pM2.5, and operational-generated ROG and NOX (all ozone precursors) are used to determine consistency with the Ozone Attainment Plan. The Guide states:
22
03/28/2023 Item No.13.
VintaSe at Folsom Senior Apartments ISMND
8y exceeding the District's mass emission thresholds for operotional emissions of ROG, NOX, PM70, or PM2.5, the Woject woutd be considered to conflictwith or obstruct implementotion of the District's air quolity planning efforts.
As shown in the discussion for question 2) below, the project's construction-generated emissions of NOx, PMro, and PMz.sand operation-generated emissions ROG and NOx would not exceed SMAQMD thresholds. The project would not conflict with or obstruct implementation of the applicable air quality plan and the impact would be less than significant. b) Result in a cumulatively considerable net increase of any criteria pqllutant for which the projed region is non- attainment under an applicable federal or state ambient air quality standard? Less than Significant lmpact. The Sacramento region is in non-attainment for ozone {ozone precursors NOx and ROG) and particulate matter (PMz.s and PMro). The project's emissions of these criteria pollutants and precursors during construction and operation are evaluated below.
Construction Em issions
Ca|EEMod version 2O2O.4.0 was used to quantifo project-generated construction emissions. The model output sheets are included in Attachment A. Construction activities were assumed to commence as early as January 2A23 and be completed in April 2O24.The quantity, duration, and intensity of construction activity inftuence the amount of construction emissions and related pollutant concentrations that occur at any one time. As such, the emission forecasts provided herein reflect a specific set of conservative assumptions based on the expected construction scenario wherein a relatively large amount of construction activity is occurring in a relatively intensive manner. Because of this conservative assumption, actual emissions could be less than those forecasted. lf construction is delayed or occurs over a longer time period, emissions could be reduced because of {L) a more modern and cleaner- burning construction equipment fleet mix than assumed in CalEEMo d; andlor (2) a less intensive buildout schedule (i.e., fewer daily emissions occurring over a longer time interva[).
The project's construction period emissions of ROG, NOx, PMro, and PMz.s are compared to the SMAQMD construction thresholds in Table 5. The SMAQMD does not have a recommended threshold for construction-generated ROG. However, quantification and disclosure of ROG emissions is recommended. The SMAQMD considers any emissions of PMro and PMz.r to be significant unless the Basic Construction Emissions Control Practices are implemented, also known as Best Management Practices (BMPs). The project would implement the SMAQMD BMPs to control fugitive dust in accordance with SMAQMD Rule 403. The modeling accounts for emissions reductions resulting from watering exposed surfaces twice daily. As shown in Table 5, the proposed project's construction period emissions of the ozone precursor NOx, PM1s, and PMz.swould not exceed the SMAQMD thresholds. lmpacts related to construction-generated emissions of ROG, NOx, PM19, and PMz.swould be less than significant.
23
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Tabte 5. Construction Criteria Pollutant and Precursor Emissions PMas
Comtructlon ActhrltY
Site 3.7
Grad 2.3
Build Construction 0.9
0.4 Architectural 0.1
Maximum Emisslons
SMAQMO Thresholds
Exceed Thresholds?
Source: CalEEMod {output data is provided in Attachment A) ROG = reactive organic gases; NOx = nitrogen oxides; PMro = particulate matter 10 microns or less in diameter; pM2.5 = particulate matter 2.5 microns or less in diameter; SMAQMD= Sacramento Metropolitan Air Quality Management District
Operational Emissions
Emissions generated from operational activities would include:
o Areas sources - combustion emissions from the use of landscape maintenance equipment, the reapplication of architectural coatings for maintenance, and the use of consumer products. . Energy sources - combustion emissions from the use of natural gas appliances, water heaters, and heating systems.
r Mobile emissions - combustion, fuel evaporation, brake and tire wear, and road dust emission resulting from worker, customer, and vendor vehicle traveling to and from the proiecl site.
The results of the modeling for project operational activities are shown in Table 5. The data is presented as the maximum anticipated daily emissions for comparison with the SMAQMD thresholds, the model output and calculation sheets are included as Attachment A to this letter. As shown in Table 6, the proposed project operation period emissions of the ozone precursor NOx, ROG, PMro, and PMz.s would not exceed the SMAQMD thresholds. lmpacts related to operation-generated emissions of ROG, NOx, PMro, aod PMz.s would be less than significant.
Table 6. Maximum Daily Operational Emissions
PMzr
Source
Area <0.01
<0.01
Mobile o.7
Maxlmum Emissions o.7
Thresholds 82
Exceed Thresholds? Jtlo
Source: CalEEMod ioutput data is provided in Attachment A) ROG : reactive organic gases; NOx = ni1leg"n oxides; PMro = particulate matter 10 microns or less in diameter; p14r 5 = particulate matter 2.5 microns or less in diameter; SMAQMD= Sacramento Metropolitan ,{ir Quality Management District
s.7
82 No
PMo
looundgldaYl
ROG
{oounds/deyl
r{ft
lpounds/davl
10.227.62.7
18.0 4.t1.8
1s,3 1.51.9
8.3 0.60.9
1.3 4.262.6
27.6 to.262.6
8s 80None
{VoNo No
NOr
looundsldavl
PMo
lpounds/darl
ROG
(oounds/dayl
<0.13.1 0.1
<0.1<0.1 0.3
2.41.51.1 2.0 2,54.2
65 8A65
No NoNo
24
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
As shown in Table 5 and Table 5, the project's maximum daily construction or operational emissions would not exceed the SMAQMD's thresholds. Therefore, the project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment, and the impact would be less than significant.
c) Expose sensitive receptors to substantial pollutant concentrations? Less than Significant lmpact. CARB and OEHHA have identified the following groups of individuals as the most likely to be affected by air pollution: the eldedy over 65, children under 14, infants (including in utero in the third trimester of pregnanry), and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis (CARB 2005, OEHHA 2015). Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved and are referred to as sensitive receptor locations. Examples of these sensitive receptor locations are residences, schools, hospitals, and daycare centers.
The closest existing sensitive receptors to the project site are the single-family residences that border the project site to the east and the single-family residences located approximately 100-ft south of the project site. Additionally, Vibra Hospital of Sacramento is located approximately 350-ft south of the project site. The closest schools to the project site are Theodore Judah Elementary School and Elanche Sprentz Elementary School, located approximately 1,400-ft to the southwest and 2,000-ft to the southeast, respectively.
The dose {of TAC) to which receptors are exposed is the primary factor used to determine health risk.
Dose is a function of the concentration of a substance in the environment and the extent of exposure a person has with the substance; a longer exposure period to a fixed quantity of emissions would result in higher health risks. Current models and methodologies for conducting cancer health risk assessments are associated with longer-term exposure periods (typically 30 years for individual residents based on guidance from OEHHAland are best suited for evaluation of long duration TAC emissions with predictable schedules and locations. These assessment models and methodologies do not correlate well with the temporary and highly variable nature of construction activities. Cancer potency factors are based on animal lifetime studies or worker studies where there is long-term exposure to the carcinogenic agent. There is considerable uncertainty in trying to evaluate the cancer risk from projects that will only last a smallfraction of a lifetime {OEHHA 2015). ln addition, concentrations of mobile source DPM emissions disperse rapidly and are typically reduced by 70 percent at approximately 500-ft (CARB 2005). Considering this information, the highly dispersive nature of DPM, and the fact that construction activities would occur at various locations throughout the project site, it is not anticipated that construction of the project would expose sensitive receptors to substantial DPM concentrations.
According to the SMAQMD, land use development projects do not typically have the potentialto result in localized concentrations of criteria air pollutants that expose sensitive receptors to substantial pollutant concentrations. This is because criteria air pollutants are predominantly generated in the form of mobile-source exhaust from vehicle trips associated with the land use development project. These vehicle trips occur throughout a paved network of roads, and, therefore, associated exhaust emissions of criteria air pollutants are not generated in a single location where high concentrations could be formed (SMAQMD 2020). Therefore, localized concentration of CO from exhaust emissions, or "CA hotspots," would only be a concern on high-volume roadways where vertical and/or horizontal mixing is substantially limited, such as tunnels or below grade highways. There are no high-volume roadways in the region with limited mixing that would be affected by project generated traffic. Once operational, the 25
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
project would not be a significant source of TACs. Therefore, the project would not expose sensitive receptors to substantial pollutant concentrations, and the impact would be less than significant. d) Result in other emissions {such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant lmpact. The project could produce odors during construction activities resulting from heavy diesel equipment exhaust and VOC released during application of asphalt. The odor of these emissions is objectionable to some; however, emissions would disperse rapidly from the project site and therefore should not be at a levelthat would affect a substantial number of people. Any odors emitted during construction activities would be temporary, short-term, and intermittent in nature, and would cease upon the facility maintenance. As a result, impacts associated with temporary odors during construction are not considered significant.
As an affordable senior rental housing development, operation of the project would not result in odors affecting a substantial number of people. Solid waste generated by the proJect would be collected by a contracted waste hauler, ensuring that any odors resulting from on-site waste would be managed and collected in a manner to prevent the proliferation of odors. The project would not result in other emissions (such as those leading to odors) adversely affecting a substantial number of people, and the impact would be less than significant.
26
03/28/2023 Item No.13.
VintaSe at Folsom Senior Apartments ISMND
IV. BIOTOGICAT RESOURCES
Potcntlrl[
Sl3nlfrcant
lmpsa
hssfhen
S[nl0cent
wldt
MhljrIon
lncorpor.ted
lessThen
Slgnnc.nt l{o
lmp.c lmprct
Would the projecti
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the
California Department of Fish and Wildlife or U,S. Fish and Wildlife Service?
l-:l
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Wildlife or US Fish and Wildlife Service?
il n n I
c) Have a substantial adverse effect on state or federally protected wetlands {including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
n I nLt
d) lnterfere substantially with the movement of any native resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
i-1 nl
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
fl I t_l tr
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conseruation plan?
An Arborist lnventory Letter Report was prepared by HELIX Environmental Planning, lnc. on March22, 2022 (HELIX 2A22al and is included as Appendix C. A Biological Resources Evaluation (BRE) was also prepared by HELIX Environmental Planning, lnc, on October 2l,2O2A (HELIX 2020) and is included as Appendix D.
Environmenlol Setling
The project site is a vacant, wooded parcel within the City of Folsom. The site is generally bordered by residential parcels and small commercial buildings, as well as the paved Oak Parkway cycling trail.
Folsom State Prison is located north of the project site, on the opposite side of Natoma Street. 27
03/28/2023 Item No.13.
at Folsom Senior rtments ISMND
Slle Condlllons
The entire project site is considered to be blue oak woodland, surrounded by urban development.
Historic aerial imagery shows that the project site has changed little since 1952 and has consisted of oak woodland with a drainage running through the site. The site is moderately disturbed. There is evidence of recreational use by bicycles and the site has a constructed dirt track with several constructed dirt ramps and jumps for bicycles, presumably constructed by kids from the adjacent residential neighborhood, lt also has debris piles and other evidence of use by transients.
Melhods
Studies conducted in support of the BRE included a special-status species evaluation, an aquatic resources evaluation, and a biological and wetlands reconnaissance survey. An Arborist Report was also concluded.
Specicl-Stotus Specles Evoluolion
For the purposes of the BRE, special-status species are those that fall into one or more of the following categories:
Listed as endangered or threatened under the Federal Endangered Species Act of 1973 (FESA), including candidate species and species proposed for listing; Listed as endangered orthreatened underthe California Endangered Specles Act (CESA), including candidate species and species proposed for listing; Designated as a Species of Special Concern {SSC} or watch-list {WL) species by the California Department of Fish and Wildlife (CDFW), or "Fully Protected" under the California Fish and Game Code {FP), or a sensitive natural community; andlor, Designated by the Catifornia Native Plant Society (CNPS) as California Rare Plant Rank 1A, LB,2A, 28, or 3.
ln order to evaluate special-status species and/or their habitats with the potentialto occur in the project site and/or be impacted by the proposed project, HELIX obtained lists of special-status species known to occur andfor having the potential to occur on the proposed project site and vicinity from the U.S. Fish and Wildlife Seruice (USFWS; USFWS 2020), the California Native Plant Society (CNPS; CNPS 2020), and the California Natural Diversity Database {CNDDB; CDFW 2020), which are included as Appendix D, The potentialfor these regionally occurring special-status species to occur in the project site is analyzed in Appendix D.
Aquollc Regourceg Evoluolion
The U.S. Fish and Wildlife Service's National Wetlands lnventory (NWl) online databaserwas reviewed to determine if there are any wetlands or other waters of the U.5. mapped by the USFWS on the project site. The NWI provides reconnaissance level information on wetlands and deepwater habitats from analysis of high-altitude aerial imagery. Historic aerial imagery from National EnvironmentalTitle Research {NETR)zwas reviewed for information on past land uses and presence of aquatic features visible on aerial imagery. NETR provides aerial imagery covering the study area at irregular intervals a
t
a
a
28
03/28/2023 Item No.13.
VintaSe at Folsom Senior Apartments ISMND
from 1956 to 2016.
Biologlcol ond Wellond Resource Evoluqllon
A biologicaland wetlands reconnaissance survey was conducted on September 30, 2020 by HELIX principal Biologist Stephen Stringer, M.S. and HELIX Biologist Stephanie Mclaughlin, M.S. between 0830 and 1400 hours. The project site was assessed to identify the habitat type(s) present on-site and the potential to support special-status plant and wildlife species. The survey consisted of a pedestrian survey of the proiect site and the surrounding area. Meandering transects of the site were performed to obtain visual coverage of the site. Plant species were identified to the level necessary to determine whether or not they were a special-status species'
The three-parameter method was used to determine the presence/absence of wetlands, which involves identifying indicators of hydrophytic vegetation, hydric soils, and wetland hydrology according to the Corps of Engineers Wetlands Delineation Monual (USACE 1987l,lhe Regional Supplement to the Corps of Engineers Wettand Delineation Manual: Arid West Region (Version 2.0; USACE 2008), A Field 6uide to the tdentification of the Ordinary High Woter Mork (OHWM) in the Arid West Region of the Western united States (Lichvar and McColley 2008) and the Sfote Wetlond Definition ond Procedures for Discharges af Dredged or Fil! Materialto Wqters of the State prepared by the State Water Resources Control Board and which became effective May 28, 2020. The presence/absence of other non-wetland aquatic resources was determined by searching for the presence of an ordinary high water mark and bed and bank. The extent of waters on the project site were mapped in the field with sub-meter accuracy using a Trimble GeoXT Global Positioning System (GPS) hand-held unit. The GPS data were downloaded from the unit, exported into ArcMap 10.7.10, and used to produce the map of aquatic features in the delineation area and to calculate the acreage of each aquaticfeature, Weather during the survey was clear and warm and hazy conditions. A complete list of plant and animal species observed on the project site during the biological reconnaissance survey is included in Appendix D.
Arborisl lnvenlory
The arborist inventory was conducted on September 24,2020 by HELIX Biologist and ISA Certified Arborist Stephanie McLaughlin, M.S. (WE-12922A). Woody plants in the proiect area with a trunk diameter of at least 4-inches at 4.5-ft above grade {diameter at breast height)were located and assessed, A diameter tape or calipers were used to verify each trunk diameter. The measurement from the trunk to the end of the longest lateral limb was estimated and used as the dripline radius' All accessible trees were numbered with a pre-printed aluminum tag. Approximate trunk locations were mapped using a sub-meter accurate global positioning system (GPS). Approximate tree locations are identified in Figure 3 of the arborist report {Appendix C).
The condition of each tree was rated one a scale of 1to 5, with 1 indicating poor condition, 3 indicating fair condition, and 5 indicating good condition. The rating considers factors health and structural factors such as the size, color, and density of the foliage; the amount of deadwood within the canopy; bud viability; evidence of wound closure; and the presence or evidence of stress, disease, nutrient deficienry, and/or insect infestation; trunk and branch configurationi canopy balance; the presence of included bark and other structural defects such as decay; and the potential for structural failure. 29
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Regulqlory Fromework Reloled lo Biologicql Resources
State and Federal Endanqered Species Acts
Special status species are protected by state and federal laws. The California Endangered Species Act (CESA; California Fish and Game Code Sections 2050 to 2097) proteEts species listed as threatened and endangered under CESA from harm or harassment. This law is similar to the Federal Endangered Species Act of 1973 (FESA; 15 USC 1531 et seq.) which protects federally threatened or endangered species (50 CFR 1.7.11, and L7.L2; listed species) frorn take. For both laws, take of the protected species may be allowed through consultation with and issuance of a permit by the agency with jurisdiction over the protected species.
Califurnio Code of Regulations ond Californio Fish and Game Code The official listing of endangered and threatened animals and plants is contained in the California Code of Regulations Title 14 5 670,5. A slate candidate species is one that the California Fish and Game Code has formally noticed as being under review by CDFW for inclusion on the state list pursuant to Sections 2A74.2 and 2075.5 of the California Fish and Game Code. CDFW also designates Species of Special Concern that are not currently listed or candidate species.
Legal protection is also provided for wildlife species in California that are identified as "fully protected animals." These species are protected under Sections 3511 (birds), 4700 (mammals), 5050 {reptiles and amphibians), and 5515 (fishes) of the California Fish and Game Code. These statutes prohibit take or possession of fully protected species at any time. The CDFW is unable to authorize incidentaltake of fully protected species when activities are proposed in areas inhabited by these species. The CDFW has informed non-federal agencies and private parties that they must avoid take of any fully protected species. However, Senate Bill (SB) 618 {2011} allows the CDFW to issue permits authorizing the incidental take of fully protected species under the CESA, so long as any such take authorization is issued in conjunction with the approval of a Natural Community Conservation Plan that covers the fully protected species (California Fish and Game Code Section 2835)' Calilornia Native Plant Prctedion Act
The California Native Plant Protection Act of 1977 (Californla Fish and Game Code Sections 1900 to 19L3) requires all state agencies to use their authority to implement programs to conserve endangered and otherwise rare species of native plants. Provisions of the act prohibit the taking of listed plants from the wild and require notification of CDFW at least 10 days in advance ofany change in land use other than changing from one agricultural use to another, which allows CDFW to salvage listed plants that would otherwise be destroYed.
Nesting and Migrutory Birds
Nesting birds are protected by state and federal laws. California Fish and Game Code (93503, 3503,5, and 3800| prohibits the possession, incidental take, or needless destruction of any bird nests or eggs; Fish and Game Code $3511 designates certain bird species "fully protected" (including all raptors), making it unlawful to take, possess, or destroy these species except under issuance of a specific permit.
The Attorney General of California has released an opinion that the Fish and Game Code prohibits incidental take. Under the Migratory Bird Treaty Act (MBTA) of 1918 (16 USF $703-711.), rnigratory bird 30
03/28/2023 Item No.13.
Vintage at Folsom Senior APartments ISMND
species and their nests and eggs that are on the federal list (50 CFR $10.13) are protected from injury or dlath, and project-related disturbance must be reduced or eliminated during the nesting cycle' The U,5. court of Appeals for the 9th circuit {with jurisdiction over california) has ruled that the MBTA does not prohibit incidental take (952 F 2d 297 - Court of Appeals, 9th circuit, 1991), City of Folsom Tree Preservotion Ordinance
Requirements related to biological resources also include protection of existing trees and specifies measures necessary to protect both ornamental and native oak trees. Chapter 12.16 ofthe Folsom Municipal Code, the Tree Preservation Ordinance, further regulates the cutting or modification of trees, including oaks and specified other trees; requires a Tree Permit prior to cutting or modification; and establishes mitigation requirements for cut or damaged trees (city of Folsom 2020b)' The Tree preservation ordinance
"rt"blith"r
policies, regulations, and standards necessary to ensure that the City will continue to preserve and maintain its "urban forests". Anyone who wishes to perform "Regulated Activities,, on "protected Trees" must apply for a permit with the City. Regulated activities include:
r Removal of a Protected Tree;
. Pruning/trimming of a Protected Tree; andf or,
. Grading or trenching within the Protected zone'
Protected trees include i
r Native oak trees with a diameter of 6-inches or larger for single trunk trees 2O-inches or larger combined diameter of native oak multi-trunk trees;
r Heritage oak trees - native oaks with a trunk diameter of 19-inches or greater and native oaks with a multi-trunk diameter of 38 inches or Ereater;
r Landmark trees identified individually by the City Councilthrough resolution as being a significant community benefit; andf or,
r Street trees within the tree maintenance strip'
lurisdictional Woterc
Any person, firm, or agency planning to alter or work in "waters of the U.S.," including the discharge of dredged or fill material, must first obtain authorization from the U.S. Army Corps of Engineers (UsAcE) undei Section 404 of the Clean Water Act (cwA). Section 401 requires an applicant for a federal license or permit that allows activities resulting in a discharge to waters of the U'S' must obtain a state certification that the discharge complies with other provisions of the CWA. The Regional Water Quality Control Board (RWeCB) administers the certification program in California. The RWQCB also regulates discharges of pollutants or dredged or fill material to waters of the State which is a broader definition than waters of the U.S.
31
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
California Fish and Game Code Sedion 7602 - Lake ond Steambed Alteration Program Diversions or obstructions of the natural flow of, or substantial changes or use of material from the bed, channel, or bank of any river, stream, or lake in California that supports wildlife resources are subject to regulation by CDFW, pursuant to Section L502 of the California Fish and Game Code. The CDFW requires notification prior to commencement of any such activities, and a Lake and Streambed Alteration Agreement (LSAA) pursuant to Fish and Game Code Sections 1601-1503, if the activity may substantially adversely affect an existing fish and wildlife resource.
Hobltqt Types/ Vegetolion Communilles
Habitat types/vegetation communities in the project site include blue,oak woodland and ephemeral and intermittent drainages.
Blue Ook Woodlond
Blue oak woodland is the predominant habitat type in the project site and occupies approximately 4,82- acres within the site. Vegetation in the blue oak woodland habitat consists primarily of blue oak (Quercus douglosii) and interior live oak lQuercus wislizenil, with some non-native species including mulberry lMorus o/bo), Chinese tallow (Triodico sebiferal, Chinese hackberry {Celtis sinensis}, and ornamental cherry (Prunus sp.). The understory is dominated by non-native grasses and forbs, including cultivated oats {Aveno sp.), ltalian rye grass (Festuca perennisl, and yellow star-thistle (Centoureo solstitiolisl. Disturbed areas, such as bike trails and jumps occur beneath the canopy of the oak woodland, and there is a significant amount of trash and debris in these areas. A small segment of the bike trail occurs in this habitat.
Topogrophy
The terrain in the proiect site and vicinity is locally flat. The elevation on the project site ranges from 350- to 370-ft above mean sea level and has low to moderate sloping from east to west. $olls
The project site includes two soil mapping units (NRCS 2O20): Argonaut-Auburn-Urban land complex, 3 to 8 percent slopes and Argonaut-Auburn complex, 3 to 8 percent slopes. Soils on the Nationat Hydric Soils List for Sacramento County (NRCS 2015) are not present in the project site.
Both soils occur on hills and are derived from residuum weathered from metamorphic rock. A typical profile of the Argonaut-Auburn-Urban land complex and Argonaut-Auburn complex, 3 to 8 percent slopes include loam from 0- to 1.4-inches, clay from 14- to 29-inches and bedrock from 29- to 33-inches; the depth to water table is more than 8O-inches.
Speciol-Sfolus Plont Species
No special-status plant species were determined to have the potentialto occur on the project site or be impacted by the proposed project. Of the 17 regionally occurring special-status plant species that were identified during the database queries and desktop review, the majority occur in wetland habitats such as vernal pools or seeps, which are absent from the site. Several others are limited to grassland or 32
03/28/2023 Item No.13.
Vintage at Folsom Senior APartments ISMNO
cismontane woodland habitats. Although the site contains blue oak woodland, the study area is located in an urban area dominated by non-native species that does not provide suitable habitat for special status plant species. Therefore, no impacts to special-status plants are anticipated as a result of the proposed project,
Specicl-Slotus Wlldlile SPecles
A total of 23 regionally occurring special-status wildlife species were identified during the database searches and desktop review. The majority of the special-status wildlife species are associated with aquatic habitats of the adjacent Sacramento Valley such as rivers, sloughs, and freshwater wetlands, including vernal pools. The remaining species are associated with specific habitats such as bats roosting in rocky habitats, caves or abandoning buildings, which are not present in or near the study area' There are no reported occurrences of special-status animal species on or adjacent to the site' However, the site provides suitable habitat for white-tailed kite {Elanus leucurusl and other nesting migratory birds. These species are discussed briefly below. Species determined to have no potentialto occur on the project site or be irnpacted by the proposed project (Appendix D) are not discussed further in this report.
White-Tailed Kite
White-tailed kite is a year-round resident in coastal and valley lowlands, where it inhabits herbaceous and open stages of most habitat types. lndividuals forage in grasslands, farmlands, and wetlands, preying mostiy on small diurnal mammals. Nests are built near the top of dense tree stands, usually near open foraging areas (Zeiner et al. 1988).
No white-tailed kites were observed during any of the biological surveys conducted for the proposed project. The nearest reported extant occurrence of white-tailed kite in the CNDDB is located approximately 3-miles southwest of the project site near Lake Natoma (CDFW 2020). Nesting habitat is present on the site in large trees and foraging habitat is present in the ruderal vegetation' However, irabitat for white-tailed kite is marginal due to the urban character of the surrounding area' No adverse effects to white-tailed kite foraging habitat are anticipated as a result of the loss of oak woodland habitatthatwould occurdueto developmentof the proposed project. Non-breedingadults could readily avoid contact with construction equipment or personnel by moving out of the construction area. Displacement of non-breeding adults would not be a significant impact. The project has potential for adverse effects to white-tailed kite through nest disturbance leading to destruction of eggs or nestlings if this species were to nest in or adjacent to the project site' Eggs and young still dependent on the nest would be susceptible to injury or mortality through physical contact or through nest abandonment caused by displacement of adults. Destruction of eggs or young would be a violation of the Fish and Game Code and a significant impact'
lmplementation of Mitigation Measure BIO-Ol would reduce impacts to white-tailed kite and other nesting birds to a less than significant level'
33
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Mlgrolory Blrds ond Roplon
The project site provides suitable habitat for nesting migratory birds and raptors. However, migratory and non-game birds are protected during the nesting season by California Fish and Game Code. The project site and immediate vicinity provides nesting and foraging habitat for a variety of native birds common to urbanized areas. Nests were not observed during surveys; however, a variety of migratory birds have the potential to nest in and adjacent to the site, in trees, shrubs and on the ground in vegetation.
Project activities such as clearing and grubbing during the avian breeding season {February 1 - August 3L) could result in injury or mortality of eggs and chicks directly through destruction or indirectly through forced nest abandonment due to noise and other disturbance. Needless destruction of nests, eggs, and chicks would be a violation of the Fish and Game Code and a significant impact.
Aquolic Resource Evoluolion
The project site is located in the City of Folsom in the Upper American River hydrologic unit (HUCL2:
130201110201). NWI mapping shows no aquatic features on the project site' HELIX conducted a routine assessment of waters of the U.S. and State on September 30,202O, generally in accordance with the U.S. Army Corps of Engineers' (USACE) Corps of Engineers Wetlands Delineation Manual and the Regionalsupplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region (Version 2.0). A formal delineation of wetlands was not completed. HELIX identified two aquatic resources; an intermittent drainage and an ephemeral drainage totaling 0.04'acre of aquatic resources that are potentially jurisdictional waters of the U,S. and state. The drainage features are depicted on the Habitat and Resource Map, which is included in Attachment A of Appendix D. No other aquatic resources are present on the site.
The intermittent drainage totals 0.03-acre and flows in a southwesterly direction along the northern boundary of the project site. The intermittent drainage is fed by an unnamed emergent wetland swale located north of the site on the Folsom State Prison grounds, via a 24-inch metal culvert that runs beneath Natoma Street to enter the project site. The drainage also receives stormwater runoff from Natoma Street. The water to the site flows intermittently, with water persisting after rain events. The banks of the drainage are incised with a stream channel that is approximately 3-ft wide at the ordinary high-water mark. The intermittent drainage on the project site does not support wetland vegetation, with most of the vegetation within the feature consistent with vegetation in the blue oak woodland vegetation community. Upon leaving the site, the intermittent drainage continues in a southwesterly direction and enters an unnamed tributary to the American Riverllake Natoma west of the prison.
An ephemeral drainage is characterized as a feature with a bed and a bank that channels water from uplands and typically only flows during periods of precipitation. Ephemeral drainages typically do not support wetlands due to their brief hydroperiods, although they typically have an incised bank. ln the project site, there is one ephemeral drainage totaling 0.01-acre that crosses the eastern portion of the site and intersects with the intermittent drainage. The ephemeral drainage in the project site supports vegetation consistent with understory vegetation described in the blue oak woodland and is dominated by weedy grasses and forbs.
34
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Determination of regulatory jurisdiction must be made by the U'S' Army Corps of Engineers (USACE), central valley Regional water Quality control Board (cvRWQcB), and cDFw. lt is likely that impacts to the drainages would occur as a result of the proposed proiect, which would be a significant impact if they are considered waters of the U.S. or state or subject to CDFW iurisdiction' Protecled Trees
A total of 111 trees are present on the site, including 94 blue oaks, seven Fremont's cottonwoods lpopulus fremontiil,four interior live oaks, two Gooding's black willow (Solix gooddingiil , one mulberry, one Chinese hackberry, one Chinese tallow, and one ornamental cherry (Figure 3)' The City of Folsom regulates trees under Section 12,16 of the Folsom Municipal Code {Tree Preservation Ordinance}' A peimit is reguired to remove native oaks {defined as valley oak, blue oak, interior live oak, and coast live oak) rneasuring 6-inches in diameter at standard height (i.e., 54-inches above natural grade, DSH), or a multi-stemmed native oak measuring a total of 2o-inches at DSH. For a tree with a common root system that branches at the ground, DSH is defined as the sum ofthe diameter ofthe largest trunk and one-half the cumulative diameter of the remaining trunks measured at 4.5-ft above natural grade.
A total of 77 trees on the project site are considered protected by Folsom City Code. None of the Fremont,s cottonwood, Chinese hackberry, Chinese tallow, mulberry, ornamental cherry or Gooding's black willow are protected. See Attachment B in Appendix C for additional data on the trees found on the project site.
Table I outlines the number of trees, with their respective DSH, to be impacted or to be retained' The project includes a total of 111 trees on the project site, of which 77 ttees are protected by the Folsom Litv coa". of the total 77 protected trees, 55 protected trees require mitigation (the remaining 12 trees do not warrant mitigation due to poor health). Underthe proposed proiect,30 protected trees, with 473.l-inches at DsH, would be retained. The proposed project would result in direct or indirect impact of the remaining 47 protected trees, which would require 571.3-inches at DSH of mitigation' However, the final mitigation for the impact of protected trees is to be determined by the City Arborist prior to issuance of a City Grading Permit. Please refer to Figure 10 for the Tree lmpact Plan' Table 7: On-Site Tree Designation
Total Trees
on Proiect
Site
Unprotected
Trees
Protected
Trees
Protected
Trees to be
impacted
Protected
Trees to be
retained
Number r_11 34 77 47 30
DSH
(inchesl
s7L.3 473.L
Based on Figure 10 included in Appendix A.
35
03/28/2023 Item No.13.
Vlntage at Folsom Senior Apartments ISMND
Evqluotion ol Biologlcol Resoulces
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less than significant with mitigation. The trees and understory grassland areas within the project site provide suitable nesting habitat for white-tailed kite and other raptors as well as other native birds and large trees adjacent to the site provide nesting habitat for raptors. Removal of vegetation containing active nests would potentially result in destruction of eggs andlor chicks; noise, dust, and other anthropogenic stressors in the vicinity of an active nest could lead to forced nest abandonment and mortality of eggs and/or chicks. Needless destruction of eggs or chicks would be a violation of the Fish and Game Code and a significant impact. Pre-construction surveys should be conducted prior to project implementation to determine if nesting birds are present on or adjacent to the site, so that measures could be implemented if needed to avoid harming nesting birds. lmplementation of Mitigation Measure BIO-01would reduce impacts to white-tailed kite and other nesting birds to a less than significant level.
Mititation Measure BIO{I1: Avoid and minimize impacts to white-tailed kite and other nesting birds. o lf project {construction) ground-disturbing or vegetation clearing and grubbing activities commence during the avian breeding season (February 1- August 31), a qualified biologist shall conduct a pre-construction nesting bird survey no more than 14 days prior to initiation of project adivities and again immediately prior to construction. The survey area shall include suitable raptor nesting habitat within 500-ft of the project boundary (inaccessible areas outside of the project site can be surveyed from the site or from public roads using binoculars or spotting scopes). Pre-construction surveys are not required in areas where project activities have been continuous since priorto February 1, as determined by a qualified biologist. Areas that have been inactive for more than L4 days during the avian breeding season must be resurveyed prior to resumption of project activities. lf no active nests are identified, no further mitigation is required. lf active nests are identified, the following measure is required; o A suitable buffer (e.g., 500-ft for raptors; 100-ft for passerines) shall be established by a qualified biologist around active nests and no construction activities within the buffer shall be allowed until a qualified biologist has determined that the nest is no longer active (i.e., the nestlings have fledged and are no longer reliant on the nest, or the nest has failed). Encroachment into the buffer may occur at the discretion of a qualified biologist. Any encroachment into the buffer shall be monitored by a qualified biologist to determine whether nesting birds are being impacted.
With implementation of Mitigation Measure BIO-01, impacts to the white-tailed kite and nesting birds would be less than significant.
b) Have a substantial adverse effect on any riparian habitat or other sensitlve natural community identified in local or regional plans, policies or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
No impact. No riparlan habitats, sensitive natural communities, or other protected habitats are located on or adjacent to the project site. Therefore, no impact would occur. 36
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Less than significant with mitigation. The 0.04-acre of aquatic features located on the project site are potentially regulated by the USACE, CVRWQCB, and CDFW under the Clean Water Act, Porter-Cologne Act, and Section 1500 of the Fish and Game Code. Therefore, removal or fill of the aquatic features would likely require a permit from these agencies. ln order to avoid impacts to jurisdictional wetland and waters, Mitigation Measure BIO-02 would be implemented, mitigating impacts to a less than significant level.
Mitigation Measure BIO-02: Avoid and minimize impacts to jurisdictional wetland and waters Prior to start of construction, the project proponent shall either prepare a formal delineation and submit it to the USACE for verification or obtain verification based on the mapping of aquatic resources in this report as well as contact the USACE, CVRWQCB, and CDFW to determine the need for permits and secure any required aquatic resources permits for impacts to waters of the U.S./State from the USACE, CVRWQCB, and CDFW, pursuant to Sections 404 and 401 of the Clean Water Act, the California Water Code, Section 1600 of the Fish and Game Code, and the State Water Resource Control Board Dredge and Fill Policy. The project proponent shall comply with all conditions of such permits including providing compensatory mitigation at a minimum L:1 ratio as required to achieve no net loss of wetlands or other waters. d) lnterfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
No impact. The project site is surrounded by development including Prison Road and Folsom State Prison to the north, Cimmaron Circle and single-family homes to the east, PG&E powerlines, single family homes, and duplexes to the south, and Fargo Way, Office Space, and Folsom City Police Department to the west. The project site does not provide any wildlife movement corridors or wildlife nursery sites. Therefore, there would be no impacts to wildlife corridors or the use of native wildlife nursery sites as a result of the proposed project.
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
[ess than significant impact with mitigation. Of the 111trees on the project site, 77 trees are considered protected by Folsom City Code. lf protected trees will be removed by the proposed project mitigation will be required per Section I2.1'6.L50'
Protected trees rated 3,4 or 5 shall be replaced at a ratio of one-inch equivalent for every one-inch of DSH removed as shown in Table 8. Protected trees rated 2 shall be replaced at a ratio of one-half-inch equivalent for every one inch removed. Protected trees rated 0 or 1 require no replacement or any other mitigation. Mitigation for trees can be done through on-site replacement planting payment of in lieu fees, or a combination thereof.
I
37
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Table 8. Tree Replacement EquivalencyTable
BeplacementTree Size DSH Equivalency
A Samplinstree; or 0.5-inch DSH
Tree in container less than 15 gallons 0.5-inch DSH
15-gallon container tree 1-inch DSH
24-inch boxtree 2-inch DSH
35-inch boxtree 3-inch DSH
Of the 77 trees protected by Folsom City Code, only 65 trees require potential mitigation based on having a health rating of 5,4,3, or 2. Of those 65 trees potentially requiring mitigation, the proposed project would only result ln direct or indirect impact to 47 protected oak trees, which would require 571,3-inches at DSH of mitigation (Table 7). With implementation of Mitigation Measure BIO-03, impacts to protected trees would be less than significant.
Mitigation Measure BIO{3: Avoid and minimize impacts to protected trees The applicant shall provide mitigation for directly or indirectly impacted oak trees based on having a health rating of 5,4,3, or 2. Based on the DSH equivalency ratio, the project applicant shall mitigate for the removal of approximately 47 oak trees (571.3 inches at DSH) that will be removed with development of the project. Finalmitigation requirements shallbe determined by the City Arborist upon receipt of final design plans prior to the issuance of a grading permit.
Mitigation for trees shall be done through on-site replacement planting, payment of in-lieu fees as determined by the City, or a combination thereof.
a A Tree Permit Application containing an Application Form, Tree Protection and Mitigation Plan, and Arborist Report shall be submitted to the City of Folsom by the owner/applicant for issuance of a Tree Work Permit and Tree Removal Permit prior to commencement of any grading or site improvement activities. The tree protection and mitigation plan shall be prepared in collaboration with a qualified arborist and shall be subject to review and approval by the City.
The tree protection and mitigation plan shall contain the contact information of the project arborist and shall be included in all associated plan sets for the project.
Removal of any protected tree shall be mitigated by planting replacement trees andfor payment of "ln-Lieu" fees on a diameter inch basis in accordance with FMCrSectlon 12.15.15Q. The proposed method of mitigation shall be subject to review and approval by the City.
Prior to starting construction, oak trees to be preserved shall be fenced with high visibility fencing consistent with the city-approved tree protection and mitigation plan. Parking of vehicles, equipment, or storage of materials is prohibited within the Tree Protection Zone of Protected Trees at all times. Signs shall be posted on exclusion fencing stating that the enclosed trees are to be preserved. Signs shall state the penalty for damage to, or removal of, the protected tree.
The owner/applicant shall retain the services of a project arborist for the duration of the development project to monitor the health of oak trees to be preserved and carry out the City- approved tree protection plan. All regulated activity conducted within the Critical Root Zone of protected rees, as that term is defined in Folsom Municipal Code {FMCI 12.L6.020, shall be a
a
a
a
38
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMNO
performed under the direct supervision of the project arborist. A copy of the executed contract for these arboricultural services shall be submitted to the City prior to the issuance of any tree or grading permits
a Certification letters by the project arborist attesting compliance with the tree protection and mitigation plan and tree permit conditions shall be submitted to the City. tl Conflict with the provisions of an adopted Habitat Conservation Plan, NaturalCommunity Conservation Plan, or other approved local, regional, or state habitat conservation plan? No impact. No Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan has been approved for the City of Folsom. Therefore, no impacts to an existing adopted Habitat Conservation Plan, Natural Community Conseruation Plan, or other approved local, regional, or state habitat conservation plan would occur. 39
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
V. CUtTURAt RESOURCES
Potcnllrlly
Slgnlflcrnt
lmpsGt
lereTten
s|tnl0clnt
wlth
Mldg.don
lncorporrtcd
LrreThan
Slgnlfinnt llo
lmplct lmF Ct
Would the project;
a) Cause a substantial adverse change in the significance of a historical resource pursuant to 515064.5?
il I
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to 515064.5?
I l:] n
c) Disturb any human remains, including'those interred
outside of dedicated cemeteries? il I f] il
The discussion below is based on a cultural resources assessment prepared by HELIX Environmental Planning, lnc. (HEUX 2}22bl, attached to this lnitial Study as Appendix E. This assessment, which addresses both archaeological and architectural resources, is based on the results of an archival records search, Native American coordination, and a pedestrian survey of the project site.
Envlronmentol Setllng
State and federal legislation require the protection of historical and cultural resources. ln 797t, President's Executive Order No. 1L593 required that all federal agencies initiate procedures to preserve and maintain cultural resources by nomination and inclusion on the National Register of Historic Places. ln 1980, the Governo/s Executive Order No. 8-64-80 required that state agencies inventory all "significant historic and cultural sites, structures, and objects under their jurisdiction which are over 50 years of age and which may qualify for listing on the National Register of Historic Places." Section 15064.s{bx1) of the CEQA Guidelines specifies that projects that cause "...physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of an historic resource would be materially impaired" shall be found to have a significant impact on the environment. For the purposes of CEQA, an historical resource is a resource listed in, or determined eligible for listing in the California Register of Historical Resources. When a project could impact a resource, it must be determined whether the resource is an historical resource, which is defined as a resource that:
(A) is historically or archaeologically significant, or is significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political or cultural annals of California; and,
(B) Meets any of the following criteria: 1) ls associated with events that have made a significant contribution to the broad patterns of California's history and cultural heritage; 2) is associated with the lives of persons important in our past; 3) embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or 4) has yielded, or may be likely to yield, information important in prehistory or history. The City of Folsom Standard Construction Specifications were developed and approved by the City of Folsom in May 2004 and updated in 40
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
April 2015. They include Article L1 - Cultural Resources, which provides direction on actions to be taken in the event that materials are discovered that may ultimately be identified as a historical or archaeological resource, or human remains (City of Folsom 2015).
Cultural Background
The following is a brief overview of the prehistory, ethnography, and historic background of the project area intended to provide a historical context for cultural resources that might be found in the vicinity of the APE. This section is not intended to be a comprehensive review of the current resources available; rather, it serves as a general overview of human occupations and uses of the general project vicinity.
Further details can be found in ethnographic studies, mission records, add major published sources, including Beardsley (1948), Bennyhoff (1950, 1954, 19771, Fredrickson {1973 and I9741, Kroeber (1925), Chartkoff and Chartkoff (1984), and Moratto (1984),
Prehistoric Background
Early archaeological investigations in central California were conducted at sites located in the Sacramento-San Joaquin Delta region. The first published account documents investigations in the Lodi and Stockton area (schenck and Dawson 1929). The initial archaeological reports typically contained descriptive narratives, with more systematic approaches sponsored by Sacramento Junior College in the 1930s. At the same time, University of California at Berkeley excavated severalsites in the lower Sacramento Valley and Delta region, which resulted in recognizing archaeotogical site patterns based on variations of inter-site assemblages. Research during the 1930s identified temporal periods in central California prehistory and provided an initial chronologicalsequence (Lillard and Purves 1936; Lillard et al. 1939). ln 1939, Lillard noted that each cultural period led directly to the next and that influences spread from the Delta region to other regions in central California (Lillard et al. 1939), ln the late 1940s and early 1950s, Beardsley documented similarities in artifacts among sites in the San Francisco Bay region and the Delta and refined his findings into a cultural modelthat ultimately became known as the CentralCalifornia Taxonomic System tCCfS). This system proposed a uniform, linear sequence of cultural succession {Beardsley 1948 and 1954). The CCTS system was challenged by Gerow, whose work looked at radiocarbon dating to show that Early and Middle Horizon sites were not subsequent developments but, at least partially, contemporaneous (Gerow L954, L974; Gerow and Force 1958), To address some of the flaws in the CCTS system, Fredrickson (1973) introduced a revision that incorporated a system of spatial and cultural integrative units. Fredrickson separated cultural, temporal, and spatial units from each other and assigned them to six chronological periods: Paleo-lndian (10000 to 6000 B.C.); Lower, Middle and Upper Archaic (6000 B.C. to A.D. 500), and Emergent (Upper and Lower, A.D. 500 to 1800). The suggested temporal ranges are like earlier horizons, which are broad cultural units that can be arranged in a temporal sequence {Moratto 1984). ln addition, Fredrickson defined several patterns-a generalway of life shared within a specific geographical region. These patterns include:
. Windmiller Pattern or Early Horizon (3000 to 1000 B.C.); r Berkeley Pattern or Middle Horizon (1000 B.C. to A.D. 500); and, . Augustine Pattern or Late Horizon {A.D. 500 to historic period}.
Brief descriptions of these temporal ranges and their unique characteristics are presented below. 4t
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Windmiller Pattern or Early Horizon FOAO tu nOA B.C.)
The Windmiller Pattern, or, the Early Horizon culture, was centered in the Cosumnes district of the Delta and emphasized hunting rather than gathering, as evidenced by the abundance of projectile points in relation to plant processing tools. Additionally, atlatl, dart, and spear technologies used typically included stemmed projectile points of slate and chert. Obsidian projectile points, however, are sparingly found on Windmiller sites. The large variety of projectile point types and faunal remains suggests exploitation of numerous types of terrestrial and aquatic species {Bennyhoff 1950; Ragir 1972}. Burials occurred in cemeteries and intra-village graves. These burials typically were ventrally extended, although some dorsal extensions are known with a westerly orientation and a high number of grave goods. Trade networks focused on acquisition of ornamental and ceremonial objects in finished form rather than as raw material. The presence of artifacts made of exotic materials such as quartz, obsidian, and shell indicate an extensive trade network that may represent the arrival of Utian populations into central California. Also indicative of this period are rectangular Holiotis and Olivella shell beads, and charmstones that usually were perforated,
Berkeley Pottern or Middle Horizon (1000 B.C' to A.D' 5AO) The Middle Horizon is characterized by the Berkeley Pattern, which displays considerable changes from the Early Horizon. This period exhibited a strong milling technology represented by minimally shaped cobble mortars and pestles, although metates and manos were still used. Dart and atlatl technologies during this period were characterized by non-stemmed projectile points made primarily of obsidian' Fredrickon (1973)suggests that the Berkeley Pattern marked the eastward expansion of Mi-Wuk groups from the San Francisco Bay Area. Compared with the Early Horizon there is a higher proportion of grinding implements at this time, implying an emphasis on plant resources rather than on hunting.
Typicat burials occurred within the village with flexed positions, variable cardinalorientation, and some cremations. As noted by Lillard, the practice of spreading ground ochre over the burial was common at this time (Lillard et al. 1939). Grave goods during this period are generally sparse and typically include only utilitarian items and a few ornamental objects. However, objects such as charmstones, quartz crystals, and bone whistles occasionally were present, which suggest the religious or ceremonial significance of the individual (Hughes 1994). During this period, larger populations are suggested by the number and depth of sites compared with the Windmiller Pattern. According to Fredrickson (19731, the Berkeley Pattern reflects gradual expansion or assimilation of different populations rather than sudden population replacement and a gradual shift in economic emphasis.
Augustine Pottern or Lote Harizon (A.D.500 to Historic Period) The Late Horizon is characterized by the Augustine Pattern, which represents a shift in the general subsistence pattern. Changes include the introduction of bow and arrow technology; most importantly, acorns became the predominant food resource, Trade systems expanded to include raw resources as well as finished products, There are more baked clay artifacts and extensive use of Haliotis ornaments of many elaborate shapes and forms. Burial patterns retained the use of flexed burials with variable orientation, but there was a reduction in the use of ochre and widespread evidence of cremation (Moratto 1984). Judging from the number and types of grave goods associated with the two types of burials, cremation seems to have been reserved for individuals of higher status, whereas other individuals were buried in flexed positions, Johnson {1976) suggests that the Augustine Pattern represents expansion of the Wintuan population from the north, which resulted in combining new traits with those established during the Berkeley Pattern.
42
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
Central California research has expanded from an emphasis on defining chronological and cultural units to a more comprehensive look at settlement and subsistence systems. This shift is illustrated by the early use of burials to identify mortuary assemblages and more recent research using osteological data to determine the health of prehistoric populations (Dickel et al. 1984). Although debate continues over a single model or sequence for central California, the general framework consisting of three temporalcultural units is generally accepted. Having said that, the identification of regional and local variation remains a major goal of current archaeological research.
Ethnographic Background
The cultural groups that occupied the project area at the time of Euro-American contact around 1845 are the Southern Maidu, sometimes called the Nisenan. This group speaks a language related to the Penutian stock, and it is generally agreed that they entered the region sometime after 1750 AD, and that their territory included the Bear River, American River, Yuba River, and southern portions of the Feather River drainages (Wilson and Towne 1978:387). Southern Maidu settlements were often located on ridges that separated parallel streams, or terraces located part way up slopes (Kroeber 1925).
The Southern Maidu village of Yodok was thought to have been originally located on the south side of the American River, in the approximate vicinity of the current town of Folsom (Kroeber 1925:394). Later ethnographers however, depict the village on the north side of the river {Bennyhoff t977:L25, L65; Wilson and Towne 1978:3881, close to the present-day location of the Cliff House Restaurant (located at 9900 Greenback Lane). lt is suspected that additional large settlements existed in the region prior to Euromerican contact which went undocumented due to the speed with which the Southern Maidu way of life was impacted by white settler colonialism.
Ethnographic descriptions ofthe Southern Maidu suggest a varied subsistence strategy based on the exploitation of available resources. They hunted a variety of large and small mammals, (including deer, bear, elk, antelope, and rabbit), fish (salmon, trout, and eel), and birds {waterfowl, crows, and pigeons), and gathered numerous edible seeds, nuts, berries, herbs, and native fruits (Kroeber 1925). The Maidu were nomadic throughout the year, following game and gathering plants. Population movements were predicated upon the changes of seasons in an effort to make subsistence gathering easier. Winter vilfages were formed along drainages at elevations below 2,500-ft (Johnson L982:74-751. Spring, summer, and early fall were spent at higher elevation camps, where resources were gathered, prepared, and stored for winter (Wilson and Towne 1978:388).
Maidu dwellings include a conical structure built out of poles thatched with bark, sticks, leaves, and pine needles. These structures were often built on top of shallowly excavated pits, with dirt built up around their perimeters. These structures measured between 10- and 15-ft in diameter. Larger Maidu villages often included dance houses, which measured between 20- and 40-ft in diameter, as well as other larger structures which functioned as sweat houses and lodges. These larger structures extended down into the subsurface, with 10- to 20-ft high posts used to support a domed roof which consisted of poles and thatched sticks, bark, and pine needles. An outer layer of earth, measuring roughly l-foot thick, was used to sealthe structure against the elements (Kroeber 1925:407-408)' The epidemic of 1833, which was brought by Euromericans into the Folsom area, had terrible ;mpacts on local Maidu populations. Thought to be malaria, this epidemic is estimated to have killed up to 75 percent of the Sacramento Valley native population, Maidu included. Another major impact to the Maidu way of life came with the discovery of gold in Coloma in 1848. This prompted thousands of 43
03/28/2023 Item No.13.
Vintage at Folsom Senior Apartments ISMND
miners to move into the region and stake claims for mining operations. This carving up of territory gn maps was quickly followed by the removal of trees, and the diversion of rivers and creeks from their natural beds, resulting in the siltation of local streams. Beyond the environmental degradations these activities caused, mining operations radically reduced the hunting and gathering territories of the Maidu and other native American groups all but extinguishing their means of maintaining self-sufficient levels of food collection/production as well as their capacity to collect materials used in the crafting of tools, structures, trade goods, and medical supplies (Levy 1978, Wilson and Towne 1978). By the 1870s, the surviving Maidu were largely working in Euro-American owned mines and ranches or working as day laborers in industrialor agricultural settings (Powers 1975). Still, Maidu people continue to live in the region to this day, and are striving to maintain, reinvigorate, and safeguard their cultural heritage and traditional practices.
Historic Background
The first Europeans to visit the interior of California were Spanish expeditions launched to recapture Native Americans who had escaped from the rule of coastal missions {Heizer and Almquist 1971, McGruder 1950, Napton 1997:5). Catholic missions were the hallmark of the Spanish Period (L796-L8221 in California, during which time 21 missions were established by the Franciscan Order along the coast between 5an Diego {among the earliest of missions} and San Francisco. Among the first Europeans to formally explore the CentralValley was Lieutenant Gabriel Moraga, who led excursions in the area between 1806 and L808 to examine the area's main water ways including what we today call the American, Calaveras, Cosumnes, Feather, Merced, Mokelumne, Sacramento, San Joaquin, and Stanislaus rivers. ln 1813, Moraga again ventured into the Central Valley, this time focusing on the south, and coined the name of the San Joaquin River (Hoover et al. 2002:369). Luis Arguello led the last of the Spanish expeditions into the CentralValley in 1817 when he traveled up the Sacramento River, past current day Sacrarnenlo, and into the mouth of the Feather River before turning back to the coast (Beck and Haase t974:18,20, Grunsky 1989:3-4)'
The Mexican Revolution, which took place between 1810 and 1821, resulted in the end of Spanish rule in modern day California and ushered in Mexican governance in the area, which was marked by an extensive issuance of land grants, mostly of lands in the interior of the state. Californios (or Mexican Citizens in California who were given land grants) were given locations by the Mexican Republic in the interior, with the goal of increasing populations in areas further from the coast where Spanish era settlements had already been established and developed into bustling areas of commerce.
Settlement of the Sacramento area began by late 1830s and early 1840s, when entrepreneurs such as John Sutter and lared Sheldon obtained land grants from the Mexican government in exchange for an agreement to protect Mexican interest in these remote regions. ln 1839, John Sutter built the earliest Euro-American settlement within Sacramento County. Named Sutter's Fort, it was well known outpost that brought with it an increase in Euro-American trappers, hunters, and settlers to the Sacramento area. John Sutter also founded New Helvetia, a trading and agricultural outfit, that was based out of Sutter's Fort, close to the location where the Sacramento and American rivers split, near today's City of Sacramento (Hoover et al. 2002).
The Mexican period was also characterized by exploration of the western Sierra Nevada mountain range by American fur trappers and later, miners. Jedediah Smith, an American trapper, is known to have explored the Sierra Nevadas in 1826 and 1827, entering the Sacramento Valley and traveling along the American and Cosumnes rivers and through the San Joaquin Valley. Soon after other trappers ventured 44