07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 19
WATER SYSTEMS CONSULTING, INC.

Water Conservation Needs
Assessment
City of Folsom, CA
WSC is preparing a WCNA that will assess its UWUO and
Commercial, Industrial, Institutional (CII) Performances Measures (PM) to inform development of locally
appropriate programs to achieve WUE goals and provide an adaptive plan for implementation initiatives.

Client Reference: Marcus Yasutake | 50 Natoma Street
Folsom, CA 95630 | [email protected] | 916.461.6161 Completion Date: Ongoing
Cost of Service: $127,786
Key Staff: Rob Natoli (Principal in Charge), Stephanie Ard (Project Manager), Spencer Waterman (QA/QC & Technical
Lead)
Folsom Water Vision
City of Folsom, CA
WSC is serving as the lead for the City’s first long-range, 50-year plan that will serve as a guiding document for
near- and long- term water decisions and management
that will result in a more reliable, resilient, and sustainable water supply. WSC is using a portfolio-based approach
and decision support framework that integrates
stakeholder input to provide clear, defensible direction for effective long-term water resources management that
upholds your community’s values. The project includes a robust stakeholder engagement process centered around
working with a citizens stakeholder group that includes 25 members representing an array of local interests and industries, and includes active engagement with City
Council and the Utilities Commission.

Client Reference: Marcus Yasutake | 50 Natoma Street
Folsom, CA 95630 | [email protected] | 916.461.6161 Completion Date: Ongoing
Cost of Service: $392,525
Key Staff: Rob Natoli (Project Manager), Stephanie Ard
(Project Engineer), Spencer Waterman (Demand Lead)

Page 154 ends

07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 20
WATER SYSTEMS CONSULTING, INC.

Water Vision Santa Barbara and
2020 UWMP
City of Santa Barbara, CA
WSC developed a roadmap for the City’s current and future supply portfolio to secure water supplies in the face of climate change. This includes the role of desalination and integrating groundwater storage programs to increase reliability. The City’s current water supply portfolio is one of the most diverse in California. WSC conducted an integrated evaluation of optimized supply portfolios involving all the City’s water. As part of the project, WSC completed the City’s 2020 UWMP and
seamlessly integrated it with the rest of the project and the City’s Water Conservation Strategic Plan. WSC’s expanded evaluation and alternative process incorporated risks and future uncertainties into the evaluation. Risks and uncertainties were used in multiple steps throughout the planning process, including the development of alternatives, developing risk scores for the alternatives, and developing resilience scenarios to test the top alternatives. The adaptive planning tool was designed to be updated by the City as uncertainties such as demand projections, SWP projections, and sustainable groundwater yield become better defined. The potential portfolios can be reevaluated with updated conditions and changing City priorities for reliability or resiliency. WSC worked closely with the City to facilitate a comprehensive stakeholder engagement process to support community aligned water planning decisions.

Client Reference: Joshua Haggmark | 735 Anacapa
Street, Santa Barbara, CA 93101 | (805) 564-5393 |
[email protected]
Completion Date: June 2021
Cost of Service: $432,000
Key Staff: Spencer Waterman (UWMP Lead)
2020 UWMP and Metro Plan
City of Fresno, CA
WSC partnered with the City of Fresno to update their
Metropolitan Water Resources Management Plan (Metro
Plan), providing a road map for the City's water supplies, water infrastructure, and sustainable growth through 2070. The 2020 Metro Plan also included a 2020 UWMP. The City’s
investment in a surface water treatment plant combined with SGMA implementation allowed the City to reduce its reliance on groundwater supplies. The UWMP was also the first evaluation of long-term demand projections after implementation of water meters and AMI data collection. WSC developed a multi-scenario demand model based on population, employment, and land use projections and evaluated approaches to comply with proposed Conservation Regulations.

The Metro Plan documented the City’s existing water assets – supplies, infrastructure, and rights – to evaluate multiple future supply and demand scenarios that considered a variety of assumptions about conservation, pace of growth, surface water availability, climate change impacts, and groundwater management actions. WSC provided the evaluation tools
developed for the Metro Plan to the City for use in the future as conditions and assumptions change. The tools include a Groundwater Water Budget and Supply / Demand Scenario Tool.

Existing supply optimization and new supplies required creative partnerships and identifying mutually beneficial projects.

Client Reference: Brock Buche | 2600 Fresno Street, Fresno, CA 93721 | (559) 621-8600 | [email protected]
Completion Date: July 2021, Metro Plan 2022
Cost of Service: $1,824,000
Key Staff:, Spencer Waterman (Demand Projections Lead)

Page 155 ends

07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 21
WATER SYSTEMS CONSULTING, INC.
2020 & 2015 UWMP
Soquel Creek Water District, Soquel, CA
As part of the District’s 2020 and 2015 UWMPs, WSC developed a quasi-econometric demand model incorporating elasticity response factors for climate, social, economic, political, and technical parameters. The demands informed the District’s Community Water Plan, which is a roadmap to achieve water supply sustainability by 2040. The model results were compared with groundwater modeling results to determine the supply deficit to be met by supplemental supplies and water shortage contingency planning efforts during a recovery period to make up for groundwater overdraft. WSC provided demand model support services to the District through as needed updates and training to help ensure the District’s supplemental supply targets are based on the most up-to-date information.

The UWMPs also included the evaluation of population growth, supply reliability, drought risk, energy use, demand management measures, and water shortage contingency planning.

Client Reference: Shelley Flock | 5180 Soquel Dr, Soquel, CA 95073 | (837) 475-8501, ext. 156 | [email protected] Completion Dates: July 2016 and April 2022
Cost of Service: $87,000 and $125,000
Key Staff: Spencer Waterman (Project Manager)
WSC presented the results of a custom demand
model in the District’s 2020 and 2015 UWMPs,
and provided as-needed model support after the
UWMPs were submitted.
2020 UWMP
Placer County Water Agency, Auburn, CA
WSC developed Placer County Water Agency’s 2020 UWMP
based on new legislated requirements from SB 606 and AB 1668. The Agency provides untreated, treated, and irrigation water directly and indirectly to wholesale and retail customers throughout Placer County and north Sacramento County. The Agency's 2020 UWMP concisely evaluated how a complex
network of supplies and demands for multiple customer agencies will be met. WSC reviewed, provided guidance, and leveraged the Agency’s WSCP including the annual Water Supply and Demand Assessment to inform development of the 5-Y ear DRA.

The UWMP was also integrated with Geographical Information Systems to convey key UWMP information.

Client Reference: Jeremy Shepard | 144 Ferguson Road, Auburn, CA 95603 | (530) 823-2066 | [email protected]
Completion Date: July 2021
Cost of Service: $72,160
Key Staff: Spencer Waterman (Technical Advisor), Rob Natoli (Project Manager)

Page 156 ends

07/08/2025 Item No.6.

F. Team Resumes

Page 157 ends

07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 22
WATER SYSTEMS CONSULTING, INC.

EDUCATION
BS, Civil Engineering, University of
Portland, Oregon

PROFESSIONAL

REGISTRATIONS
Professional Engineer, California License
No. 95788
Professional Engineer, Washington State
License No. 54859
“Working closely with
clients, I am always striving
to develop water solutions
that will have long-term
positive impacts on
communities. ”

PROJECT MANAGER
Stephanie has more than 13 years of experience in hydraulic modeling, master planning, project management, technical writing, and communication. She has worked with over a dozen clients to develop comprehensive planning documents that include preparing growth scenarios, identifying current and future water system needs, and meeting state reporting requirements. Stephanie has collaborated with all members of the technical team, as well as City staff. Stephanie is currently working on the City's Folsom Water Vision Project and Water Conservation Needs assessment and brings a unique understanding of your water systems. Her experience will provide planning leadership, team collaboration, and a local presence to the team.

REPRESENTATIVE PROJECTS
2020 UWMP and Related Conservation and
Reporting Services, City of Folsom, CA. QA/
QC. WSC worked collaboratively with the City
to prepare and submit the City’s 2020 UWMP
and Water Shortage Contingency Plan (WSCP).

The 2020 UWMP and WSCP address new
requirements and position the City for future
required reporting with additional deliverables
including a Water Use Effi ciency Technical
Memorandum (WUE TM), updated Water
Conservation Ordinance, and a database for annual
updates. Stephanie provided quality control and
review support for the WUE TM.

Water Conservation Needs Assessment, City of
Folsom, CA. Project Manager. Preparing a Water
Conservation Needs Assessment that will assess
its UrbanWater Use Objective and Commercial,
Industrial, Institutional Performances Measures to
inform development of locally appropriate programs
to achieve water use efficiency goals, and provide an
adaptive plan for implementation initiatives.

Hydraulic Model Update, Citrus Heights Water
District, Citrus Heights, CA. Project Manager.

Provided management and technical oversight
for hydraulic model update, constructed in
Infowater. Project included updating the District’s
pipe network, matching model settings to the
District's operating setpoints, updating steady
state and extended period simulation demands,
and validating steady state scenarios by comparing
model output to pressure data provided by the
District at the well pumps.

Folsom Water Vision, City of Folsom, CA.

Project Engineer. Leading the City’s first long-
range, 50-year plan that will serve as a guiding
document for near- and long-term water
decisions and management that result in a more
reliable, resilient, and sustainable water supply.

Using a portfolio-based approach and decision
support framework that integrates stakeholder
input to provide clear, defensible direction for
effective long-term water resources management
that upholds your community’s values. The
project includes a robust stakeholder engagement
process centered around working with a citizens
stakeholder group that includes 25 members
representing an array of local interests and
industries and including active engagement with
City Council and the Utilities Commission.

Wholesale Master Plan, San Juan Water
District, Granite Bay, CA. Project Engineer.

The Plan addressed current and future water
supply, demand, and capacity conditions for the
District’s Wholesale Division. A key emphasis
of the plan was ensuring water supply reliability,
given the District's heavy reliance on Folsom
Lake. The plan assessed supply alternatives,
including infrastructure enhancements and
regional supply options. Additionally, it conducted
an evaluation of the District’s 100 MG surface
water treatment plant and performed a planning-
level condition assessment of the wholesale
system infrastructure. A cost-effective Capital
Improvement Plan was devised to allocate
resources for infrastructure replacement, renewal,
and planned improvement projects.

Stephanie Ard
Stephanie Ard

Page 158 ends

07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 23
WATER SYSTEMS CONSULTING, INC.

EDUCATION
BS, Civil Engineering, California
Polytechnic State University, San
Luis Obispo, CA

REGISTRATIONS
Professional Engineer - Civil,
California, No. C78271
Professional Engineer - Civil,
Nevada, No. 23188
Professional Engineer - Civil,
Oregon, No. 96253
“I enjoy the personal
and technical aspects of
being a water engineer
and being a part of
finding great solutions
on projects. I strive to
communicate well, take
initiative and bring a
high level of quality to
everything I do. ”

PRINCIPAL IN CHARGE
Rob Natoli brings 17 years of engineering experience in the water and wastewater industry.

He has managed both large and small projects across California, including projects for the City. He is skilled at directing multidisciplinary teams to exceed client expectations.

Having served as project manager for the City’s 2020 UWMP, Rob understands the City’s water system, existing supplies, and expected demands.

REPRESENTATIVE PROJECTS
Folsom Water Vision, City of Folsom, CA.

Project Manager. Leading the City’s first long-
range, 50-year plan that will serve as a guiding
document for near- and long-term water
decisions and management that result in a more
reliable, resilient, and sustainable water supply.

Using a portfolio-based approach and decision
support framework that integrates stakeholder
input to provide clear, defensible direction for
effective long-term water resources management
that upholds your community’s values. The
project includes a robust stakeholder engagement
process centered around working with a citizens
stakeholder group that includes 25 members
representing an array of local interests and
industries and including active engagement with
City Council and the Utilities Commission.
2020 UWMP and Related Conservation and
Reporting Services, City of Folsom, CA. Project
Manager. WSC worked collaboratively with the
City to prepare and submit the City’s 2020
UWMP and Water Shortage Contingency Plan
(WSCP). The 2020 UWMP and WSCP address
new requirements and position the City for future
required reporting with additional deliverables
including a Water Use Efficiency Technical
Memorandum (WUE TM), updated Water
Conservation Ordinance, and a database for annual
updates. Project development included data review
and analysis; population and demographic analysis;
demand projection development; system supply
analysis; water supply reliability assessment; water
shortage contingency planning updates; demand
management measure analysis; and climate change
impact analysis. The UWMP was prepared per
the DWR 2020 UWMP Guidebook, met the
submittal deadline, and was approved by DWR.
2020 UWMP, Placer County Water Agency,
Auburn, CA. Project Manager. WSC developed
Placer County Water Agency’s 2020 UWMP
based on new legislated requirements from
SB 606 and AB 1668. The Agency provides
untreated, treated, and irrigation water directly
and indirectly to wholesale and retail customers
throughout Placer County and north Sacramento
County. The Agency's 2020 UWMP concisely
evaluated how a complex network of supplies
and demands for multiple customer agencies
will be met. WSC reviewed, provided guidance,
and leveraged the Agency’s WSCP including the
annual Water Supply and Demand Assessment
(WSDA) to inform development of the 5-Y ear
DRA. The UWMP was also integrated with
Geographical Information Systems (GIS) to
convey key UWMP information.
2021 Drought Operations Planning Project, San
Juan Water District, Granite Bay, CA. Project
manager. Due to the extreme drought conditions
that could be faced in dry years, SJWD
requested an analysis of system supplies and
demands to develop operational procedures in
the event the lake level decreases below the point
of the Main Pumping Plant operations. To the
develop the regional solutions, WSC coordinated
with wholesale customer and local agency local
agencies to understand, verify, and quantify
potential supply sources, existing infrastructure
(including Sacramento Suburban Water District
pump back supply availability), and interties.

WSC’s team provided drought demand analysis
and supply assessment and hydraulic modeling
to provide recommended improvements and an
operations summary. The operations summary,
provides operation actions based on the Folsom
Lake level.

Rob Natoli
Rob Natoli PE

Page 159 ends

07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 24
WATER SYSTEMS CONSULTING, INC.

TECHNICAL LEAD AND QA/QC
Spencer Waterman brings 15 years of planning experience with an emphasis on water resources planning and water use efficiency. His experience includes water, wastewater, and recycled water resources planning, grant funding applications, water use efficiency and conservation services, water law compliance reporting, and GIS services. Spencer has led 24 UWMPs, 20 Annual Water Supply and Demands Assessments, and 10 2024 Annual Water Use Reports. He has also served as a member of DWR's UWMP Guidebook Workgroup for three UWMP cycles.

REPRESENTATIVE PROJECTS
2020 Urban Water Management Plan, City
of Folsom, Folsom, CA. Supply and Demand
Lead. Led development of the City's 2020
UWMP which met DWR’s requirements. The
project addressed new requirements for the
2020 UWMP, including 5-year DRA, long-
term forecast for each water supply source, and
WSCP with prescriptive elements.
2020 Urban Water Management Plan, Placer
County Water Agency, Auburn, CA. Technical
Advisor. Supported development of the Agency's
2020 UWMP which met DWR’s requirements.

The project addressed new requirements for the
2020 UWMP, including 5-year DRA, long-term
forecast for each water supply source, and WSCP
with prescriptive elements.

Water Vision Santa Barbara, City of Santa Barbara,
CA. Supply and Demand. Collaborated with the
City and the City’s Water Conservation Strategic
Plan consultant to develop a demand envelope.

Assessed multiple demand scenarios to account for
uncertainty in demand projections factors, such as
population and employment projections, demand
rebound, conservation program response, climate
change impacts, economic recession, and response
to rate changes. The multiple demand scenarios
were used to evaluate the adequacy and reliability
of the City’s water supply portfolio, incorporating
future supply and demand risks, and under
unprecedented drought conditions to provide a
long-term view of how the City’s water supplies will
be managed in the future. The City's 2020 UWMP
was completed as part of this project.

Water Conservation Needs Assessment, City of
Folsom, CA. QA/QC and Technical Lead. Preparing
a Water Conservation Needs Assessment that
will assess its UrbanWater Use Objective and
Commercial, Industrial, Institutional Performances
Measures to inform development of locally
appropriate programs to achieve water use
efficiency goals, and provide an adaptive plan for
implementation initiatives.

Folsom Water Vision, City of Folsom, CA.

Demand Lead. Leading the City’s first long-range,
50-year plan that will serve as a guiding document
for near- and long-term water decisions and
management that result in a more reliable, resilient,
and sustainable water supply. Using a portfolio-
based approach and decision support framework
that integrates stakeholder input to provide clear,
defensible direction for effective long-term
water resources management that upholds your
community’s values. The project includes a robust
stakeholder engagement process centered around
working with a citizens stakeholder group that
includes 25 members representing an array of
local interests and industries and including active
engagement with City Council and the Utilities
Commission.
2020 Urban Water Management Plan, Soquel
Creek Water District, Soquel, CA. Project
Manager. Prepared an Urban Water Management
Plan that includes evaluation of population,
demand projections, supply reliability, drought risk
assessment, energy analysis, and technical writing.

Demand projections were developed using a SEPT+
model, that uses statistics to evaluate changes in
demand based on social, economic, political, and
technological parameters.

Spencer Waterman
Spencer Waterman

EDUCATION
BS, City & Regional Planning,
California Polytechnic State
University, San Luis Obispo

CERTIFICATIONS
American Water Works Association,
California-Nevada Section, Water
Use Efficiency Practitioner Grade 1,
Certificate # 1714

PROFESSIONAL

AFFILIATIONS
American Water Works
Association, Member
California Water Efficiency
Partnership, Member
“My life revolves around
water—surfing, sailing,
fishing, hiking and
recreating around water
drive my passion to foster
a better water future
through prudent water
resources planning. ”

Page 160 ends

07/08/2025 Item No.6.

CITY OF FOLSOM 2025 URBAN WATER MANAGEMENT PLAN | 25
WATER SYSTEMS CONSULTING, INC.

EDUCATION
BS, Civil Engineering, California
Polytechnic State University

PROFESSIONAL

REGISTRATIONS
Engineering In Training, California, No.
180296
PACP Certified No. P0041682-032023
“I take pride in supporting
projects that provide optimal
solutions for WSC's clients
and partners. ”

SUPPORTING AUTHOR
David is a staff engineer with experience supporting water, wastewater, and reuse projects throughout California. David brings experience analyzing data in Excel and ArcGIS. He has experience working with the proposed team for clients, such as Citrus Heights Water District and South Tahoe Public Utility District. David will help author the UWMP.

REPRESENTATIVE PROJECTS
Annual Water Supply and Demand Assessment,
West Basin Municipal Water District, Carson,
CA. Engineering Support. This project consisted
of preparing the State-mandated Annual Water
Supply and Demand Assessment for the West
Basin Municipal Water District, which included
communication with water purveyors which
purchase water from West Basin. David provided
data analysis assistance.

County Operations Center Water Shortage
Contingency Plan, County of San Luis Obispo,
San Luis Obispo, CA. Engineering Support. This
project consisted of creating a water shortage
contingency plan for the County Operations
Center and analyzing opportunities for the Chorro
Valley (in which the County Operations Center sits)
to augment its water supply. David researched water
transfers, exchanges, agreements, entitlements, and
allocations in the vicinity of the County Operations
Center from the previous 80 years.

Water Resources Implementation Strategy,
Calleguas Municipal Water District, Calleguas,
CA. Engineering Support. This extensive regional
collaboration evaluates potential projects to
address long-term water supply and reliability
challenges, building on the Water Supply
Alternatives Study, by establishing a preferred
portfolio list considering project costs, reliability,
yield, and adaptability. Through workshops,
interviews, research, and analysis, collaborated with
over a dozen stakeholders, including retail water
providers, groundwater agencies, and regional
partners, to establish water supply needs and
priorities, define project evaluation criteria, and
recommend feasible projects and a framework
David Williams
David Williams EIT , PACP
for delivery. David researched infrastructure
opportunities and constraints and groundwater
users and issues to help development and analysis
of potential water supply, intertie, and exchange
projects within Calleguas’s service area and with
neighboring purveyors.

Drought Relief Project, Baron Canyon Mutual
Water Company (BCMWC), San Luis Obispo,
CA. Engineering Support. WSC supported efforts
with BCMWC to identify and develop project
elements to provide immediate drought relief
infrastructure improvements for a small community
with 30 residential connections. Supported
the writing of the funding application for the
Department of Water Resources Small Community
Drought Relief Program which was successful
in being awarded $1,986,000 in grant funds.

Subsequently, David provided engineering support
on the design of a 2,600-foot water transmission
main, a single 15-hp pump booster pump station,
and the equipping of a production well.

Pure Water Soquel Injection Well Equipping
Engineering Services During Construction,
Soquel Creek Water District, Soquel, CA.

Engineering Support. Pure Water Soquel is
a groundwater replenishment and seawater
intrusion prevention project. This portion of the
project pertained to civil site improvements at
three recycled water injection well sites including
piping and valving, well backwash pumps, buried
backwash water equalization tanks, electrical,
telemetry, and site grading and finishing. David
assisted with Engineering Services During
Construction, including submittal and RFI review
and field directive preparation. Attended weekly
construction progress meetings and served as the
interim primary point of contact with the client.

Page 161 ends

07/08/2025 Item No.6.
betterwaterfuture.com

Page 162 ends

07/08/2025 Item No.6.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11417 – A Resolution Authorizing the City Manager to Execute a Three-Year Agreement with the County of Sacramento for $177,646.98 to Provide Emergency Hazardous Materials Response Team Services from the General Fund (Fund 010)

FROM: Fire Department

RECOMMENDATION / CITY COUNCIL ACTION

The Fire Department recommends that the City Council pass and a pprove Resolution No. 11417 – A Resolution Authorizing the City Manager to Execute a Three-Year Agreement with the County of Sacramento for $177,646.98 to Provide Emergency Hazardous Materials Response Team Services from the General Fund (Fund 010).

BACKGROUND / ISSUE

Hazardous materials are present throughout the City and, if released or uncontrolled, can pose significant fire, health, and environmental risks. While many incidents are minor and handled by City first responders, more complex situations require specialized expertise. In such cases, the City may request assistance from one or more Hazardous Materials Response Teams (HMRT) located within Sacramento County to help identify unknown substances and contain the release.

The Sacramento County Environmental Management Department (SCEMD) provides administrative oversight of the County’s HMRT program. Because HMRT operations involve advanced training and specialized equipment beyond the City's current capabilities, this agreement enables the City to request assistance from any of the three HMRT units operated

Page 163 ends

07/08/2025 Item No.7.
2 by the Sacramento Fire Department and Sacramento Metropolitan Fire District. The City of Folsom has maintained this service agreement with SCEMD since 2001.

POLICY / RULE

Folsom Municipal Code – 2.36.120 Contracting for Professional Services. Professional services, as defined in Section 2.36.030, costing $ 75,049 or greater shall be contracted for by the City Council.

ANALYSIS

The City of Folsom is exposed to a wide range of hazardous material risks related to transportation, manufacturing, storage, and use. These incidents have the potential to result in the release of hazardous substances that could threaten public safety, he alth, and the environment. Within Folsom’s incorporated boundaries, the City serves as the lead agency for pre-incident planning, emergency response, and hazardous materials clean-up.

Pursuant to Folsom Municipal Code §2.24.010, the Fire Department is de signated as the lead department for managing hazardous materials incidents that may adversely affect lives or property. The Police Department and the Public Works Street Division often support these responses, along with the Sacramento County Emergency Ma nagement Department (SCEMD), which assists in the control and management of both intentional and unintentional hazardous material releases.

The ability of the on -duty Fire Department Incident Commander to request a Hazardous Materials Response Team (HMRT) is critical for the effective and timely mitigation of hazardous incidents. Each year, the Fire Department responds to approximately 170 hazardous materials emergencies. Over the past three years, about 90% of these incidents were classified as Level 1 (Minor Hazard) and were resolved using only local resources. Fewer than 10% were Level 2 (Moderate Hazard) incidents, which required a single HMRT unit to assist in identifying unknown chemicals or stopping the release of hazardous substances. No Level 3 (Severe Hazard) incidents requiring multiple HMRT units have occurred in the past three years.

Even when an HMRT response is not requested, these specialized units are often consulted remotely by Folsom Fire personnel for expert guidance on chemical identi fication, risk assessment, and mitigation strategies. This consultation capability is a critical resource that enhances the department’s ability to manage hazardous materials incidents effectively using a measured, risk-based approach.

The proposed agreement with SCEMD would ensure continued access to HMRT resources for both on-scene response and remote consultation related to Level 2 and Level 3 incidents. While the City of Sacramento, the Sacramento Metropolitan Fire District, and the City of Folsom are all signatories to the Sacramento County Fire Agency Automatic Aid Agreement, HMRT units

Page 164 ends

07/08/2025 Item No.7.
3 are classified as "Specialized Agency Resources" under that agreement and are not covered by its automatic aid provisions.

A copy of the proposed agreement is provided in Attachment No. 2.

FINANCIAL IMPACT

The total cost of the three -year contract for Hazardous Materials Response Team (HMRT) services provided to the City of Folsom by the County of Sacramento is approximately $177,646.98. The annual contribution is calculated using a population-based formula applied to all incorporated areas of the County , excluding the City of Sacramento , as well as unincorporated areas.

Annual costs are as follows:

FY 2025-26 $58,886.63
FY 2026-27 $58,502.63
FY 2027-28 $60,257.72

This Agreement is scheduled to begin on July 1, 2025, and will remain in effect through June 30, 2028, unless mutually extended in writing by both the City of Folsom and Sacramento County for up to one additional two-year period.

If extended, the estimated contributions for the optional years are:

*FY 2028-29 $64,347.01
*FY 2029-30 $63,927.42

* These extension-year amounts will only apply if both parties formally agree in writing to extend the agreement under the same terms and conditions outlined in the attached Agreement.

Sufficient funds are budgeted and available for Fiscal Year 2025-26 in the General Fund (Fund 010). Future year contract amounts will be included as part of the annual budget process. As the Agreement allows either party to terminate with 180 days’ written notice, future year contributions are not guaranteed. Payments will be made in two equal installments each year— one in November and one in April.

Where possible, the City will pursu e cost recovery from individuals or entities found responsible for hazardous materials releases, which may help offset a portion of the annual costs.

ENVIRONMENTAL REVIEW

Page 165 ends

07/08/2025 Item No.7.
4 There are no foreseeable environmental impacts.

ATTACHMENTS

1. Resolution No. 11417 – A Resolution Authorizing the City Manager to Execute a Three- Year Agreement with the County of Sacramento for $177,646.98 to Provide Emergency Hazardous Materials Response Team Services from the General Fund (Fund 010)

2. Agreement between County of Sacramento and the City of Folsom for Hazardous Materials Incident Response Teams

Submitted,

Ken Cusano, Fire Chief

Page 166 ends

07/08/2025 Item No.7.

Attachment 1

Page 167 ends

07/08/2025 Item No.7.

Resolution No. 11417

Page 1 of 1 ends

RESOLUTION NO. 11417

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE

A THREE-YEAR AGREEMENT WITH THE COUNTY OF SACRAMENTO FOR $177,646.98 TO PROVIDE EMERGENCY HAZARDOUS MATERIALS RESPONSE TEAM SERVICES FROM THE GENERAL FUND (FUND 010)

WHEREAS, effectively responding to, managing, and controlling hazardous materials incidents requires highly specialized training, equipment, supplies, and communication systems to ensure the safety and protection of both the public and emergency responders; and

WHEREAS, the County of Sacramento has contracted for the services of the City of Sacramento and Sacramento Metropolitan Fire Protection District Hazardous Materials Response Teams to respond to emergency incidents in the cities and unincorporated areas of Sacramento County; and

WHEREAS, the funding for these services has been budgeted in the FY 2025-26 General Fund (Fund 010) with future year contract amounts being included as part of the annual budget process; and

WHEREAS, the City of Folsom costs through the term of this contract are set at:

FY 2025-26 $58,886.63
FY 2026-27 $58,502.63
FY 2027-28 $60,257.72
*FY 2028-29 $64,347.01
*FY 2029-30 $63,927.42

*If extended, one two-year term:

NOW, THEREFORE, BE IT RESOLVED that the City Council authorizes the City Manager to execute an agreement with the County of Sacramento to provide emergency Hazardous Materials Response Team services to the City of Folsom.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

___________________________________
Sarah Aquino, MAYOR
ATTEST:
____________________________________
Christa Freemantle, CITY CLERK

Page 168 ends

07/08/2025 Item No.7.

Attachment 2

Page 169 ends

07/08/2025 Item No.7.

Page 1 of 15 ends

AGREEMENT BETWEEN COUNTY OF SACRAMENTO AND THE

CITY OF FOLSOM FOR HAZARDOUS MATERIALS

INCIDENT RESPONSE TEAMS

This AGREEMENT is made and entered into as of th e _______ day of ________, 2025, between the COUNTY OF SACRAMENTO, a political subdivision of the State of California, (hereinafter referred to as “COUNTY”) and the CITY OF FOLSOM, a municipal corporation, (hereinafter referred to as “City”).

RECITALS

WHEREAS, the timely response to and proper management of incidents involving the intentional or unintentional release of hazardous materials are critical to the protection of human health and the environment; and

WHEREAS, the proper management and control of responses to emergency incidents involving hazardous materials requires highly specialized training, equipment, supplies, communications and other resources in order to provide adequate protection for the health and safety of the public and emergency response personnel; and

WHEREAS, COUNTY has entered into contractual agreements with the Sacramento Fire Department and the Sacramento Metropolitan Fire District (“CONTRACTORS”) to provide hazardous materials response teams (“HAZ-MAT TEAMS”), with specialized apparatus, equipment and capabilities; and

WHEREAS, the cost of establishing and maintaining a hazardous materials response team capability is costly, so CITY has determined that it would be more economical, feasible and appropriate to utilize the services of HAZ -MAT TEAM S available from COUNTY through its contractual agreements with CONTRACTORS rather than to develop and maintain duplicate response teams; and

WHEREAS, COUNTY has offered, subject to consideration, to include CITY within the scope of service cover age of HAZ-MAT TEAMS through the provisions of its contractual agreements with CONTRACTORS and a separate mutual aid agreement; and
WHEREAS, pursuant to California State Executive Order N -6- 22, COUNTY must include language regarding certain economic sanctions; and

Page 170 ends

07/08/2025 Item No.7.

Page 2 of 15 ends

WHEREAS, COUNTY and CITY desire to enter into this Agreement on the terms and conditions set forth herein.

NOW, THEREFORE , in consideration of the mutual promises hereinafter set forth, the parties hereto agree as follows:

I. SCOPE OF SERVICES

COUNTY shall provide services in the amount, type and manner described in “Exhibit A,” attached hereto and incorporated herein by this reference.

II. TERM

This Agreement shall be effective and commence as of July 1, 2025, and shall end on June 30, 2028, unless CITY and COUNTY mutually agree in writing to extend the term for up to one additional two-year period.

III. NOTICE

Any notice, dem and, request, consent, or approval that either party hereto may or is required to give the other pursuant to this Agreement shall be in writing and shall be either personally delivered or sent by certified mail -return receipt requested, addressed as follows:

TO COUNTY

DIRECTOR
Sacramento County
Environmental Management
Department
11080 White Rock Rd.

Suite 200
Rancho Cordova, CA
95670

TO CITY

CITY MANAGER
City of Folsom
50 Natoma Street
Folsom, CA 95630

Any party may change the address to which subsequent notice and/or other communications can be sent by giving written notice designating a change of address to the other party, which shall be effective upon date of receipt.

Page 171 ends

07/08/2025 Item No.7.

Page 3 of 15 ends

IV. COMPLIANCE WITH LAWS

CITY and COUNTY shall observe and comply with all applicable Federal, State, and County laws, regulations and ordinances.

V. GOVERNING LAWS AND JURISDICTION

This Agreement shall be deemed to have been executed and to be performed within the State of California and shall be construed and governed by the internal laws of the State of California. Any legal proceedings arising out of or relating to this Agreement shall be brought in Sacramento County, California.

VI. CONFLICT OF INTEREST

CITY and its officers and employees shall not have a financial interest, or acquire any financial interest, direct or indirect, in any business, property, or source of income which could be financially affected by or otherwise conflict in any manner or degree with the performance of services required under this Agreement.

VII. INDEMNIFICATION

1. CITY shall indemnify, defend and hold harmless COUNTY, its Board of Supervisors, Counsel, officers, directors, agents, employees, contractors and volunteers (including students) , from and against any and all liability, loss, expense (including payment of reasonable attorneys’ fees), or claims for injury or damages arising out of the performance of this Agreement, only in proportion to and to the extent such l iability, loss, expense, attorneys' fees or claims for injury or damages are caused by or result from the negligent or intentional act or omission of CITY, its Board of Directors, Counsel, officers, directors, agents, employees, contractors and volunteers (including students).

2. COUNTY shall indemnify, defend, and hold harmless CITY, its Board of Directors, Counsel, officers, directors, agents, employees, contractors and volunteers (including students) , from and against any and all liability, loss, expense (including payment of reasonable attorneys’ fees), or claims for injury or damages arising out of the performance of this Agreement, only in proportion to and to the extent such liability, loss, expense, attorneys' fees or cla ims for injury or damages are caused by or result from the negligent or intentional act or

Page 172 ends

07/08/2025 Item No.7.

Page 4 of 15 ends

omission of COUNTY, its Board of Supervisors, officers, directors, agents, employees, contractors and volunteers (including students).

3. This indemnity shall survive the termination or expiration of the Agreement.

VIII. INSURANCE

Each party, at its sole cost and expense, shall carry insurance – or self-insure – its activities in connection with this Agreement, and obtain, keep in force , and maintain insurance or equivalent programs of self -insurance for general liability, workers ’ compensation, property, professional liability, and business automobile liability adequate to cover its potential liabilities hereunder. Each party agrees to p rovide the other thirty (30) days' advance written notice of any cancellation, termination or lapse of any of the insurance or self-insurance coverages. Failure to maintain insurance as required in this Agreement is a material breach of contract and is gr ounds for termination of the Agreement.

IX. SUBCONTRACTS, ASSIGNMENT

1. Any subcontracting shall be subject to all applicable provisions of this Agreement. Subcontracting services delivered under this Agreement shall not in any way relieve COUNTY of any duty or responsibility under this Agreement and COUNTY shall remain primarily obligated for the performance of all services.

2. This Agreement is not assignable by COUNTY in whole or in part, without the prior written consent of CITY.

X. AMENDMENT AND WAIVER

Except as provided herein, no alteration, amendment, variation, or waiver of the terms of this Agreement shall be valid unless made in writing and signed by both parties. Waiver by either party of any default, breach or condition precedent shall not be construed as a waiver of any other default, breach or condition precedent, or any other right hereunder. No interpretation of any provision of this Agreement shall be binding upon COUNTY unless agreed in writing by DIRECTOR and counsel for COUNTY. No interpretation of any provision of this Agreement shall be binding

Page 173 ends

07/08/2025 Item No.7.

Page 5 of 15 ends

upon COUNTY unless agreed in writing by DIRECTOR and counsel for COUNTY.

XI. INTERPRETATION

This Agreement shall be deemed to have been prepared equally by both of the parties, and the Agreement and its individual provisions shall not be construed or interpreted more favorably for one party on the basis that the other party prepared it.

XII. TERMINATION

Either party may terminate this Agreement upon one hundred and eighty (180) days written notice to the other party. Notice shall be deemed served on the date of mailing.

XIII. SEVERABILITY

If any term or condition of this Agreement or the application thereof to any person(s) or circumstance is held invalid or unenforceable, such invalidity or unenforceability shall not affect other terms, conditions, or applications which can be given effect without the invalid term, condition, or application; to this end the terms and conditions of this Agreement are declared severable.

XIV. PRIOR AGREEMENTS

This Agreement constitutes the entire contract between COUNTY and CITY regarding the subject matter of this Agreement. Any prior agreements, whether oral or written, between COUNTY and CITY regarding the subject matter of this Agreement are hereby terminated effective immediately upon full execution of this Agreement.

XV. SURVIVAL OF TERMS

All services performed and deliverables provided pursuant to this Agreement are subject to all of the terms, conditions, price discounts and rates set forth herein, notwithstanding the expiration of the initial term of this Agreement or any extension thereof. Further, the terms, conditions and warranties contained in this Agreement that by their sense and context are intended to survive the completion of the performance, cancellation or termination of this Agreement shall so survive.

Page 174 ends

07/08/2025 Item No.7.

Page 6 of 15 ends

XVI. COMPENSATION

Compensation under this Agreement shall be as provided in “Exhibit B, ” attached hereto and incorporated herein by this reference.

XVII. RECOVERY COSTS

CITY and COUNTY are both, individually or collectively, permitted to seek financial recovery of costs of the emergency response against responsible parties, provided there exists legal authority to do so.

XVIII. ANNUAL REPORT

1. CONTRACTORS will submit a bi-annual rep ort to CITY.

Reporting periods are July 1 through December 31; and
January 1 through June 30. Said reports shall be provided withing 30 days after each reporting period. The following information will be included:
a. Date,
b. Full address,
c. Jurisdiction (city or unincorporated
county),
d. Brief descriptions of the incident,
e. Chemical(s) involved,
f. Determination of private or public
property responsibility,
g. Number of hours spent on scene, and
h. Number of personnel responding

XIX. DUPLICATE COUNTERPARTS

This Agreement may be executed in duplicate counterparts. The Agreement shall be deemed executed when it has been signed by both parties.

XX. AUTHORITY TO EXECUTE

Each person executing this Agreement represents and warrants that he or she is duly authorized and has legal authority to execute

Page 175 ends

07/08/2025 Item No.7.

Page 7 of 15 ends

and deliver this Agreement for or on behalf of the parties to this Agreement. Each party represents and warrants to the other that the execution and delivery of the Agreement and the performance of such party's obligations hereunder have been duly authorized.

XXII. STATUS OF CITY

1. It is understood and agreed that CITY (including CITY employees) is an independent municipality and that no
relationship of employer-employee exists between the
parties hereto. CITY assigned personnel shall not be
entitled to any benefits payable to employees of
COUNTY, including but not limited to, medical, dental,
vision and retirement benefits, life and disability
insurance, sick leave, bereavement leave, jury duty
leave, parental leave, or any other similar benefits
or compensation otherwise provided to permanent
civil service employees pursuant to the County
Charter, the County Code, the Civil Service Rule, the
Sacramento County Employees' Retirement System
and/or any and all memoranda of understanding
between COUNTY and its employee organizations .

COUNTY is not required to make any deductions or
withholdings from the compensation payable to CITY
under the provisions of this Agreement; and as an
independent municipality, CITY hereby indemnifies
and holds COUNTY harmless from any and all claims
that may be made against COUNTY based upon any
contention by any employee of CITY that an employer
employee relationship exists by reason of this
Agreement.

2. If, in the performance of this Agreement, any third
persons are employed by CITY, such person shall be
entirely and exclusively under the direction,
supervision, and control of CITY. All terms of
employment, including hours, wage s, working
conditions, discipline, hiring, and discharging, or any other terms of employment or requirements of law,
shall be determined by CITY, and COUNTY shall have
no right or authority over such persons or the terms
of such employment.

Page 176 ends

07/08/2025 Item No.7.

Page 8 of 15 ends

3. It is further understood and agreed that as an
independent municipality, and not an employee of
COUNTY, CITY assigned personnel shall not have any
entitlement as a COUNTY employee, right to act on
behalf of COUNTY in any capacity whatsoever as agent,
nor to bind COUNTY to any obligation whatsoever.

CITY employees shall not be covered by COUNTY's
workers’ compensation; nor shall CITY employees be
entitled to compensated sick leave, vacation leave,
retirement entitlement, participation in group health,
dental, life and other insurance programs, or entitled
to other fringe benefits payable by COUNTY to
employees of COUNTY.

XXIII. NONDISCRIMINATION

1. CITY agrees and assures COUNTY that CITY shall comply with all applicable federal, state, and local anti-
discrimination laws, regulations, and ordinances and
that it will not unlawfully discriminate, harass, or allow harassment against any employee, applicant for
employment, employee or agent of COUNTY, or
recipient of services contemplated to be provide d or
provided under this Agreement, because of race,
ancestry, marital status, color, religious creed,
political belief, national origin, ethnic group
identification, sex, sexual orientation, age ( over 40), medical condition (including HIV and AIDS), or
physical or mental disability. CITY shall ensure that the evaluation and treatment of its employees and
applicants for employment, the treatment of
COUNTY employees and agents, and recipients of
services are free from such discrimination and
harassment.

2. CITY represents that it is in compliance with and
agrees that it will continue to comply with the
Americans with Disabilities Act of 1990 (42 U.S.C. §
12101 et seq.) and regulations and guidelines issued
pursuant thereto.

3. CITY agrees to compile data, maintain records, and
submit reports as required by law to permit effective
enforcement of all applicable antidiscrimination laws

Page 177 ends

07/08/2025 Item No.7.

Page 9 of 15 ends

and this provision.

4. CITY shall include this nondiscrimination provision in all subcontracts related to this Agreement.

XXIV. DISPUTES

Any dispute arising out of or relating to this
Agreement shall be decided by DIRECTOR and the
CITY, with the assistance of their operational staff.

In the event that the DIRECTOR and the CITY cannot
resolve the dispute, the Sacramento County Executive
and CITY Manager shall meet within thirty (30) days
to consider the matter and reach a decision. In the
event that the Sacramento County Executive and CITY
Manager cannot resolve the dispute, either party may
pursue its available legal and equitable remedies,
pursuant to the laws of the State of California. Nothing in this Agreement or provision shall constitute a
waiver of any of the government claim filing
requirements set forth in Title 1, Division 3.6, of the California Government Code or as otherwise set forth
in local, state, and federal law.

XXV. ECONOMIC SANCTIONS

Pursuant to California State Executive Order N -6-22 (Order) imposing economic sanctions against Russia and declaring support of Ukraine, COUNTY shall terminate any contract with any individual or entity that is in violation of the Order or that is subject to economic sanctions therein, and shall not enter a contract with any such individual or entity while the Order is in effect.

IN WITNESS WHEREOF, the parties hereto have c aused this Agreement to be duly executed as of the day and year first written above.

COUNTY OF SACRAMENTO, a political subdivision of
the State of California,

By:

Date:

Page 178 ends

07/08/2025 Item No.7.

Page 10 of 15 ends

Jennea Monasterio, Director
Sacramento County
Environmental Management Department

Agreement reviewed and approved
by County Counsel:

Date:

Blake Sequeira, Deputy County Counsel

CITY OF FOLSOM, A Municipal Corporation:

________________________________________
Date

______________________________________
Bryan Whitemyer, City Manager

ATTEST:

________________________________________
Christa Freemantle, City Clerk Date

FUNDING AVAILABLE:

______________________________________
Stacey Tamagni, Finance Director Date

ORIGINAL APPROVED AS TO CONTENT:

________________________________________
Ken Cusano, Fire Chief Date

ORIGINAL APPROVED AS TO FORM:

______________________________________
Steven Wang, City Attorney Date

Page 179 ends

07/08/2025 Item No.7.

Page 11 of 15 ends

EXHIBIT A to Agreement
between the COUNTY OF SACRAMENTO,
and the CITY OF FOLSOM

I. SCOPE OF SERVICES

COUNTY will work within a partnership relationship with CITY and provide the following services:

1. Immediately upon notification of an emergency situation involving hazardous materials that has been classified as a LEVEL II or LEVEL III INCIDENT, COUNTY, through its contractual agreement with CONTRACTORS, shall provide for the dispatch a HAZ -MAT TEAM to respond to the scene. If multiple LEVEL II or LEVEL III hazardous materials incidents are occurring simultaneous within CITY’s jurisdiction or other areas of the County, the determination of the priority of response by a HAZ-MAT TEAM shall be at the sole discretion of the highest ranking chief officer of the Sacramento Fire Department or Sacramento Metropolitan Fire Protection District on-duty or on-call at the time, based upon the assessment of the risks to the public or environment associated with the incident without regard to whether the incident is within CITY’s jurisdiction or other areas of the County.

2. Immediately upon arrival at the scene of the emergency hazardous materials incident, the HAZ -MAT TEAM Captain shall report to the Incident Commander having jurisdiction, and shall establish the Haz -Mat Group as identified in the Incident Command System. The Haz-Mat Group Safety Officer shall make immediate contact with the Safety Officer of the incident.

3. The services to be provided by the HAZ-MAT TEAM to COUNTY or COUNTY FIRE DISTRICTS shall include the following:

a. Assessing the scene as to the appropriate classification of the level of the incident, determination of any additional personal or environmental protective measures that may be required without further delay and determining the possible need for an additional assistance not already requested.

b. Providing rescue to victims, if necessary, and if possible without exposing emergency response personnel to
unreasonable life-threatening risks.

Page 180 ends

07/08/2025 Item No.7.

Page 12 of 15 ends

c. Identification of the types and quantities of any hazardous materials involved, determination of the hazards they pose to life, environment and property, and advice as to appr opriate measures necessary to mitigate, contain and suppress the emergency hazardous materials incident.

d. Providing advice in the extinguishment of any fires that may exist or pose a threat, if such extinguishment is considered to be essential by the Inci dent Commander, and in the selection of extinguishing agents to be utilized and the methods of application.

e. Providing advice and assistance locating special supplies in the suppression and containment of the hazardous materials
involved in the incident including measures such as temporary diking, diverting, channeling, plugging, removal of fuel, and the elimination of ignition sources.

f. Providing advice and assistance in the establishment of a Field Command Post in an appropriate and safe location.

g. Providing advice and assistance in the establishment of a Resource Pool Staging Area in an appropriate and safe location.

h. Providing advice and assistance in the determination and establishment of any restricted (hot) or limited access (warm) zones, and any areas that may need to be evaluated.

i. Providing technical coordination with any private sector resources that may be involved in response to the emergency hazardous materials incidents.

j. Providing advice and assistance to COUNTY Environmental Management Department, CITY Department of Public Works, and COUNTY Office of Emergency Services as may be
requested for the purpose of declaring a health emergency or a state of emergency, coordinating emergency response
activities of CITY departments, and clean-up and restoration of the affected site to normal daily use.

k. Providing technical information to the Incident Commander for dissemination to the public through the facilities of the Emergency Alert System or directly to news media regarding the emergency hazardous materials incident.

Page 181 ends

07/08/2025 Item No.7.

Page 13 of 15 ends

l. Providing advice and assistance as necessary, in the training of HAZ-MAT TEAM and CITY emergency response personnel.

4. Nothing in this Agreement or any Exhibit hereto shall obligate COUNTY to provide HAZ -MAT TEAM services outside of
Sacramento County.

Page 182 ends

07/08/2025 Item No.7.

Page 14 of 15 ends

EXHIBIT B to Agreement
between the COUNTY OF SACRAMENTO
and the CITY OF FOLSOM

COMPENSATION

1. COMPENSATION SCHEDULE: For the services provided by
COUNTY through its contractual agreements with CONTRACTORS, CITY shall pay to COUNTY the following amounts:

Fiscal Year
City of Folsom
Portion Due to
County
EMD Administrative
Costs Total Amount
Due to County*
2025-26, beginning
July 1, 2025 $55,814.67 $3,071.96 $58,886.63
2026-27, beginning
July 1, 2026 $57,489.11 $1,013.52 $58,502.63
2027-28, beginning
July 1, 2027
$59,213.79 $1,043.93 $60,257.72
2028-29, beginning
July 1, 2028**
$60,990.20 $3,356.81 $64,347.01
2029-30, beginning
July 1, 2029**
$62,819.91 $1,107.51 $63,927.42

*The total amount due to the County per fiscal year is the sum of the Hazardous Material Response Team (HMRT) and
Environmental Management Department (EMD) Administrative costs. The cost for HMRT and EMD for Fiscal Year 2026 is $55,814.67 and $3,071.96, for Fiscal Year 2027 is $57,489.11 and $1,013.52, for Fiscal Year 2028 is $59,213.79 and $1,043.93, for Fiscal Year 2029 is $60,990.20 and $3,356.81, and for Fiscal Year 2030 is $62,819.91 and $1,107.51, respectively.
**The amounts for Fiscal Year 2028 -29 and 2029 -30 shall be applicable only if the Agreement term is extended upon mutual written consent between CITY and COUNTY under the same
terms and conditions as are contained in this Agreement.

Page 183 ends

07/08/2025 Item No.7.

Page 15 of 15 ends

3. PAYMENTS
In accordance with the Compensation provisions of this Agreement, CITY shall address and submit payments to COUNTY at:

Payment shall be made to “Sacramento County Environmental Management Department” and send to the following address:

11080 White Rock Road
Suite 200
Rancho Cordova, CA 95670

COUNTY may change the address to which subsequent payments shall be sent by giving written notice designating a change of address to CITY, which shall be effective upon receipt.

Payments shall be made on the following schedule:

Fiscal Year 25/26:

First installment is due by November 1, 2025 and the second installment is due by April 1, 2026

Fiscal Year 26/27:

First installment is due by November 1, 2026 and the second installment is due by April 1, 2027
Fiscal Year 27/28:

First installment is due by November 1, 2027 and the second installment is due by April 1, 2028
Fiscal Year 28/29:

First installment is due by November 1, 2028 and the second installment is due by April 1, 2029
Fiscal Year 29/30:

First installment is due by November 1, 2029 and the second installment is due by April 1, 2030

Page 184 ends

07/08/2025 Item No.7.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11418 – A Resolution of the City Council Approving Submittal of Response to the Findings and
Recommendations of the Sacramento County Grand Jury
Regarding Elder Financial Crimes

FROM: Police Department

RECOMMENDATION / CITY COUNCIL ACTION

Staff recommends that the City Council adopt Resolution No. 11418 - A Resolution of the City Council Approving Submittal of Response to the Findings and Recommendations of the Sacramento County Grand Jury Regarding Elder Financial Crimes.

BACKGROUND / ISSUE

Among other investigations undertaken by the 2025-2025 Sacramento County Grand Jury across the county, the Grand Jury investigated financial abuse of elder victims and law enforcement's response to the problem and made various findings and recommendations. While the Grand Jury did not interview the Folsom Police Department in making its report, it required a response from the Folsom City Council and requested a response from the Folsom Police Chief with respect to certain findings and recommendations in the report.

Elder Financial Abuse is when the property of a person age 65 or older is taken or used wrongfully, including fraudulently. Internet and phone scams targeting seniors, as well as theft by family members and caregivers fall into this category.

Police staff prepared a proposed response to address the Grand Jury's findings and recommendations regarding elder financial abuse in Sacramento County.

Page 185 ends

07/08/2025 Item No.8.
2 POLICY / RULE

Pursuant to California Penal Code section 933, the governing body of any public agency subject to the grand jury's reviewing authority shall comment to the presiding judge of the superior court on the findings and recommendations pertaining to matters under the control of the governing body.

ANALYSIS

The Grand Jury's findings and recommendations are general and address areas of concern across the county. The Folsom Police Department’s response to those findings and recommendations focuses on our local response to elder financial abuse. In many cases, the generalized statements do not consider the dynamics of Folsom or the training and practices the Police Departments uses in preventing and addressing Elder Financial Abuse.

The Resolution would approve submittal of the proposed response to the Grand Jury's findings and recommendations regarding elder financial abuse in Sacramento County.

FINANCIAL IMPACT

There will be no direct financial impact by the adoption of this Resolution.

ENVIRONMENTAL REVIEW

The proposed response to the Grand Jury report is not a “project” under the California Environmental Quality Act. No environmental review is required.

ATTACHMENTS

Resolution No. 11418 - A Resolution of the City Council Approving Submittal of Response to the Findings and Recommendations of the Sacramento County Grand Jury Regarding Elder Financial Crimes.

Page 186 ends

07/08/2025 Item No.8.

Attachment 1

Page 187 ends

07/08/2025 Item No.8.

Resolution No. 11418
RESOLUTION NO. 11418

A RESOLUTION OF THE CITY COUNCIL APPROVING SUBMITTAL OF

RESPONSE TO THE FINDINGS AND RECOMMENDATIONS OF THE

SACRAMENTO COUNTY GRAND JURY REGARDING ELDER FINANCIAL CRIMES

WHEREAS, the 2024-2025 Sacramento County Grand Jury completed its term of service and submitted a Final Report to the Sacramento County Superior Court on or about May 27, 2025; and

WHEREAS, the Sacramento County Grand Jury conducted in-depth investigations and made Findings and Recommendations in its Final Report; and

WHEREAS, one of the investigations conducted by the Grand Jury was law enforcement response to reports of financial abuse against elder adult victims; and

WHEREAS, while the Grand Jury interviewed numerous local law enforcement agencies during its investigation, no interview was conducted by the Grand Jury with the Folsom Police Department; however, the Grand Jury required a response from the Folsom City Council and requested a response from the Folsom Police Chief to certain Findings and all Recommendations in the Final Report; and

WHEREAS, Penal Code Section 933 requires that comments from the public agency pertaining to matters under the control of its governing body be submitted by the governing body of the public agency.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom approves submittal of the response attached hereto as Exhibit A to the Sacramento County Grand Jury. The Chief of Police is authorized to submit the response to the Presiding Judge of the Sacramento County Superior Court on behalf of the Folsom City Council and the Folsom Police Department.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):
___________________________________
Sarah Aquino, MAYOR
ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 188 ends

07/08/2025 Item No.8.

Page 189 ends

07/08/2025 Item No.8.

Page 190 ends

07/08/2025 Item No.8.

Page 191 ends

07/08/2025 Item No.8.

Page 192 ends

07/08/2025 Item No.8.

Page 193 ends

07/08/2025 Item No.8.

Page 194 ends

07/08/2025 Item No.8.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11419 - A Resolution Amending Resolution No. 11377 – A Resolution Adopting a list of Projects for Fiscal Year 2025-26 to be Funded by Senate Bill 1: The Road Repair and Accountability Act to include Project Details

FROM: Public Works Department

RECOMMENDATION / CITY COUNCIL ACTION

The Public Works Department recommends that the City Council pass and adopt Resolution No. 11419 - A Resolution Amending Resolution No. 11377 – A Resolution Adopting a list of Projects for Fiscal year 2025 -26 to be Funded by Senate Bill 1: The Road Repair and Accountability Act to include Project Details.

BACKGROUND / ISSUE

On May 27, 2025, City Council approved Resolution No. 11377, adopting a list of projects for Fiscal Year 2025 –26 to be funded by Senate Bill 1 (SB -1): The Road Repair and Accountability Act. The Fiscal Year 2025 –26 SB -1 funds will be allocated to support infrastructure project s aimed at enhancing transportation and pedestrian safety, roadway maintenance, and overall operational efficiency. However, staff inadvertently omitted the specific project locations from the adopted resolution.

While the list of projects remains unchan ged from the original adoption of Resolution No. 11377, an amendment is now necessary to include the full project details and locations in the resolution to ensure compliance with California Transportation Commission (CTC) requirements and maintain transparency in the use of SB-1 funds.

Page 195 ends

07/08/2025 Item No.9.
2 The projects proposed to utilize this funding are as follows:

Project Title: Citywide ADA Compliance Project FY 2025-26 FY25-26 SB-1 Funding: $725,000
Schedule: FY 2025-26
Useful Life: 50 years
Description: A project that includes an annual rotation of sidewalk inspections and repairs, with one council district receiving attention each year. This ensures a systematic and ongoing effort to improve accessibility across the city for people with disabilities and to mitigat e sidewalk uplifts and damage. These funds will be used to inspect Council District 1 and make required repairs. A portion of the funds will be utilized to address the remaining significant findings within Council District 4, which was inspected and partially repaired in FY 24-25.

Project Title: Street Overlay/Pavement Management Project FY25-26 SB-1 Funding: $1,575,000
Schedule: FY 2025-26
Useful Life: 25 years
Description: This project is currently in the scoping phase. The neighborhoods listed below are being considered for analysis, contingent upon the available budget and pavement maintenance treatment selected : Rancho Diablo (Hancock Drive Neighborhood), Willow Creek Estates (Willow Creek Drive and Flower Drive Neighborhood) , and Willow Creek Estates East (Bittercreek Drive and Big Valley Road Neighborhood).

POLICY / RULE

To receive SB -1 funds, local agencies are required by the CTC to annually submit a list of projects that may be constructed and funded with R oad Maintenance and Rehabilitation Account funds, and the list must be part of an approved Resolution. The list of projects allows the City to scope the Capital Improvements to meet the available funding.

ANALYSIS

Staff inadvertently omitted the specific project locations from the previous ly adopted Resolution. The list of projects must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement.

FINANCIAL IMPACT

Road Maintenance and Rehabilitation Account revenue for Fiscal Year 2025-26 is estimated to be $2.3 million. Adopting this list of eligible projects authorizes staff to use the Fiscal Year 2025-26 funding for the projects on the list.

Page 196 ends

07/08/2025 Item No.9.
3 ENVIRONMENTAL REVIEW

This action is exempt from environmental review under the California Environmental Quality Act (CEQA).

ATTACHMENT

1. Resolution No. 11419 - A Resolution Amending Resolution No. 11377 – A Resolution Adopting a List of Projects for Fiscal Year 2025-26 to be Funded by Senate Bill 1: The Road Repair and Accountability Act to Include Project Details

2. Resolution No. 11377 – A Resolution Adopting a List of Projects for Fiscal Year 2025- 26 to be Funded by Senate Bill 1: The Road Repair and Accountability Act

Submitted,

Marcus Yasutake, ACTING PUBLIC WORKS DIRECTOR

Page 197 ends

07/08/2025 Item No.9.

Attachment 1

Page 198 ends

07/08/2025 Item No.9.

Resolution No. 11419

Page 1 of 2 ends

RESOLUTION NO. 11419

A RESOLUTION AMENDING RESOLUTION NO. 11377 – A RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025-26 TO BE FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT

TO INCLUDE PROJECT DETAILS

WHEREAS, Resolution No. 11377 was adopted without inclusion of the specific project details and locations, which are required for full compliance with California Transportation Commission guidelines; and

WHEREAS, the project list remains unchanged from the originally adopte d resolution, and an amendment is necessary solely to incorporate the omitted project information;

WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into l aw by California Governor Brown in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and

WHEREAS, SB 1 includes accountability and transparency provisions that will ensure that Folsom residents are aware of the projects proposed for funding in their community, and which projects have been completed each Fiscal Year; and

WHEREAS, the City must pass a resolution adopting a list of eligible projects proposed to receive funding from the Road Maintenance and Rehabil itation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and

WHEREAS, the list of projects will include projects that may not be completed in the fiscal year allotted due to available funding; and

WHEREAS, the City will receive an estimated $2.3 million in RMRA funding from SB 1 in Fiscal Year 2025-26; and

WHEREAS, this is the ninth year in which the City is receiving SB 1 funding that will enable the City to continue essential pavement resurfacing and concrete projects that would not have otherwise been possible without SB 1; and

WHEREAS, the City used a combination of the Pavement Management System and known priorities to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective pavement resurfacing projects that also meet Folsom’s priorities for transportation investment; and

WHEREAS, the SB 1 project list and overall investment in Folsom’s local streets and roads infrastructure - with a focus on basic maintenance and safety, investing in the complete

Page 199 ends

07/08/2025 Item No.9.

Resolution No. 11419

Page 2 of 2 ends

streets infrastructure, and using cutting edge technology, materials, and practi ces — will have significant positive co-benefits citywide; and

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom approves this Resolution Amending Resolution No. 11377 adopting the list of projects below to be funded in FY 2025-26 by Senate Bill 1: The Road Repair and Accountability Act.

Project
Project
Description

Project Location
Estimated
Project Schedule
Estimated
Useful Life
Citywide ADA
Compliance
Project FY 25-26

Sidewalk
Inspections and
Repairs
Inspect and Repair District
1, Complete Repairs in
District 4
Begin July 2025
End June 2026
50 year life

Street
Overlay/Pavement
Management
FY 25-26
Pavement
Resurfacing
Rancho Diablo, Willow
Creek Estates, and Willow
Creek Estates East
Neighborhoods
Begin July 2025
End June 2026
25 year life

PASSED AND ADOPTED this 8th day of July 2025 by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

___________________________________
Sarah Aquino, MAYOR

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 200 ends

07/08/2025 Item No.9.

Attachment 2

Page 201 ends

07/08/2025 Item No.9.

Resolution No. 11377

Page 1 of 2 ends

RESOLUTION NO. 11377

A RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025-26 TO BE FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT

WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by California Governor Brown in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and

WHEREAS, SB 1 includes accountability and transparency provisions that will ensure that Folsom residents are aware of the projects proposed for funding in their community, and which projects have been completed each Fiscal Year; and

WHEREAS, the City must pass a resolution adopting a list of eligible projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and

WHEREAS, the list of projects will include projects that may not be completed in the fiscal year allotted due to available funding; and

WHEREAS, the City will receive an estimated $2.3 million in RMRA funding from SB 1 in Fiscal Year 2025-26; and

WHEREAS, this is the ninth year in which the City is receiving SB 1 funding that will enable the City to continue essential pavement resurfacing and concrete projects that would not have otherwise been possible without SB 1; and

WHEREAS, the City used a combination of the Pavement Management System and known priorities to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective pavement resurfacing projects that also meet Folsom’s priorities for transportation investment; and

WHEREAS, the SB 1 project list and overall investment in Folsom’s local streets and roads infrastructure - with a focus on bas ic maintenance and safety, investing in the complete streets infrastructure, and using cutting edge technology, materials, and practices — will have significant positive co-benefits citywide; and

WHEREAS, the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom approves this Resolution adopting the list of projects below to be funded in FY 2025-26 by Senate Bill 1: The Road Repair and Accountability Act.

Docusign Envelope ID: EFC24847-83D9-462B-A0FC-8A3DA4805E18

Page 202 ends

07/08/2025 Item No.9.

Resolution No. 11377

Page 2 of 2 ends

Project
Project
Completion
Estimated
Useful Life
 Citywide ADA Compliance Project FY 25-26 June 2026 50 year life  Street Overlay/Pavement Management FY 25-26 June 2026 25 year life

PASSED AND ADOPTED this 27th day of May 2025 by the following roll-call vote:

AYES: Councilmember(s): Leary, Raithel, Rohrbough, Kozlowski, Aquino NOES: Councilmember(s): None
ABSENT: Councilmember(s): None
ABSTAIN: Councilmember(s): None

___________________________________
Sarah Aquino, MAYOR

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Docusign Envelope ID: EFC24847-83D9-462B-A0FC-8A3DA4805E18

Page 203 ends

07/08/2025 Item No.9.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 204 ends

07/08/2025 Item No.9.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11420 - A Resolution Authorizing the City Manager to Execute Amendment No. 2 to the Agreement (Contract No. 173- 21 23 -017) with Water Works Engineers, LLC for Design and Engineering Services During Construction for $125,172 from the Water Operating Fund (Fund 520) and the Sewer Operating Fund (Fund 530) for the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302) and the Water System Rehabilitation Project No. 4 (WA2403)
FROM: Environmental and Water Resources Department

RECOMMENDATION / CITY COUNCIL ACTION

The Environmental and Water Resources Department recommends the City Council pass and adopt Resolution No. 11420 - A Resolution Authorizing the City Manager to Execute Amendment No. 2 to the Agreement (Contract No. 173 -21 23-017) with Water Works Engineers, LLC for Design and Engineering Services During Construction for $125,172 from the Water Operating Fund (Fund 520) and the Sewer Operating Fund (Fund 530) for the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302) and the Water System Rehabilitation Project No. 4 (WA2403).

BACKGROUND / ISSUE

The Environmental and Water Resources (EWR) Department identifies sewer infrastructure rehabilitation and replacement projects through sewer master plans and ongoing sewer condition assessment programs. As a condition of the City’s State permit for its wastew ater collection system, the EWR Department is required to perform ongoing condition assessments on the wastewater system and correct any defects/deficiencies identified through this process. Through these efforts, EWR staff identified the Basin 4 Phase 2 Sewer Rehabilitation Project as a priority project.

The Basin 4 Phase 2 Sewer Rehabilitation Project consists of rehabilitating and replacing approximately 8,145 lineal feet of sanitary sewer pipeline, approximately 37 manholes, and the reconnection of ap proximately 132 sanitary sewer laterals along multiple streets within the

Page 205 ends

07/08/2025 Item No.10.
2 Historic District including Leidesdorff Street, Canal Street, Sutter Street and Figueroa Street Alley, Figueroa Street, Figueroa Street and Mormon Street Alley, Mormon Street and Nat oma Street Alley, and Persifer Street and Dean Way Alley . This Project was originally approved by City Council on April 11, 2023, through Resolution No. 11020.

The existing sewer mainline on Leidesdorff Street is currently located in residential front ya rds with limited access. The goal of the Basin 4 Phase 2 Sewer Rehabilitation Project is to relocate the sewer mainline within the roadway of Leidesdorff Street to allow for better access for maintenance, repair, and condition assessment.

During design, City staff and the design team identified a potential alignment conflict between an existing storm drain line and the proposed alignment of the new sewer line in the street as opposed to the front yards. In discussions with the Public Works Department and the design team, the most favorable option is to relocate the existing storm drain line. This would allow the City to move the sewer line from the front yards into the street as well as upgrade existing storm drain infrastructure that is approximately 40 years old. The other options include replacing the sewer line in the front yards or trying to lower hundreds of feet of sewer line in other areas, both of which are not ideal.

Additional effort was also identified as part of Amendment No. 2 for bid phase s ervices, construction phase services , environmental services and separating items within the project documents for bidding purposes in order to differentiate all construction tasks by project fund since this project is funded by both the Water Operating Fu nd (Fund 520) and Sewer Operating Fund (Fund 530).

This resolution will authorize the City Manager to execute Amendment No. 2 to the Agreement (Contract No. 173 -21 23 -017) with Water Works Engineers, LLC for design and engineering services during construction for the Basin 4 Phase 2 Sewer Rehabilitation Pr oject and the Water System Rehabilitation Project No. 4 for a new not -to-exceed amount of $ 80,238 for the Basin 4 Phase 2 Sewer Rehabilitation Project and a new not -to-exceed amount of $ 44,934 for the Water System Rehabilitation Project No. 4.

POLICY / RULE

In accordance with Chapter 2.36 of the Folsom Municipal Code, supplies, equipment, services, and construction with a value of $75,049 or greater shall be awarded by City Council.

ANALYSIS

Services recommended to be provided by Water Works Engineers, LLC include both design and construction administration services for the Basin 4 Phase 2 Sewer Rehabilitation Project and the Water System Rehabilitation Project No. 4. The following describes the additional engineering services that Water Works Engineers, LLC will be performing:

- Basin 4 Phase 2 Sewer Rehabilitation Project:

Page 206 ends

07/08/2025 Item No.10.
3 o Separating items within the project documents for bidding purposes in order to differentiate all construction tasks by project fund since this project is funded by both the Water Operating Fund (Fund 520) and Sewer Operating Fund (Fund 530).

o New storm drain design work (including generating storm drain plan and profile sheets) in order to avoid utility conflict and maintain proposed sewer alignment.

o Additional environmental work due to storm drain design.

o Additional bid phase services such as meetings, issuing addendums and adding 2 conformed bid drawing sheets.

o Additional construction phase services such as RFI’s, submittal review, design changes during construction, and project coordination.

- Water System Rehabilitation Project No. 4:

o Separating items within the project documents for bidding purposes in order to differentiate all construction tasks by project fund since this project is funded by both the Water Operating Fund (Fund 520) and Sewer Operating Fund (Fund 530).

o Additional bid phase services such as meetings, issuing addendums and adding 2 conformed bid drawing sheets.

o Additional construction phase services such as RFI’s, submittal review, design changes during construction, and project coordination.

This resolution will authorize the City Manager to execute Amendment No. 2 to the Agreement (Contract No. 173 -21 23 -017) with Water Works Engineers, LLC for design and engineering services during construction for the Basin 4 Phase 2 Sewer Rehabilitation Pr oject and the Water System Rehabilitation Project No. 4 for a new not -to-exceed amount of $80,238 for the Basin 4 Phase 2 Sewer Rehabilitation Project and a new not -to-exceed amount of $44,934 for the Water System Rehabilitation Project No. 4.

FINANCIAL IMPACT

In May 2023, the City executed an agreement with Water Works Engineers, LLC for Design and Engineering Services During Construction for the Basin 4 Phase 2 Sewer Rehabilitation Project for a total amount not to exceed $ 280,438. Amendment No. 1 to th e agreement was executed in April 2024, adding $90,855 in Design and Engineering Services During Construction for the Basin 4 Phase 2 Sewer Rehabilitation Project (Project WW2302) and $62,385 to the Water System Rehabilitation Project No. 4 (Project WA2403) and increasing the total compensation by $153,240 for a new not-to-exceed contract total of $433,678.

Page 207 ends

07/08/2025 Item No.10.
4 The Environmental and Water Resources Department is requesting that Amendment No. 2 for design and engineering services during construction be exe cuted with Water Works Engineers, LLC for $125,172 for a new contract total amount not-to-exceed $558,850.

$80,238 of the amendment total is requested for additional design phase services, assistance during bidding and additional engineering services during construction for the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302). This Project is included in the Capital Improvement Plan with a Fiscal Year 2025 -26 total project budget of $ 4,630,598. Sufficient funds are budgeted an d available in the Sewer Operating Fund (Fund 530) for the cost of the amendment.

$44,934 of the amendment total is requested for additional design phase services, assistance during bidding and additional engineering services during construction for the W ater System Rehabilitation Project No. 4 (WA2403). This Project is included in the Capital Improvement Plan with a Fiscal Year 2025-26 total project budget of $1,359,385. Sufficient funds are budgeted and available in the Water Operating Fund (Fund 520) for the cost of the amendment.

The EWR Department recommends approving Amendment No. 2 to the agreement with Water Works Engineers, LLC for $80,238 for the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302) and $44,934 for the Water System Rehabilitation Project No. 4 (WA2403) for a total amendment amount of $125,172 and a new contract total amount not -to-exceed $558,850. This new not -to-exceed contract amount of $558,850 for design and engineering services during construction represents approximately 9% of the total combined p roject cost ($5,989,983) for Fiscal Year 2025-26. Since the storm drain line relocation is a result of the work on the water and sewer lines, the costs (including design and construction) related to the storm drain line will be allocated to the water or sewer funds.

ENVIRONMENTAL REVIEW

This project is replacement and/or improvement of existing infrastructure with negligible or no expansion of use and therefore is categorically exempt from environmental review under the California Environmental Quality Act as noted in Title 14 – California Code of Regula tions, Chapter 3 – Guidelines for Implementation of the California Environmental Quality Act, Article 19 – Categorical Exemptions, Sections 15301 (Existing Facilities), 15302 (Replacement or Reconstruction), and/or 15304 (Minor Alterations to Land).

ATTACHMENT

Resolution No. 11420 - A Resolution Authorizing the City Manager to Execute Amendment No. 2 to the Agreement (Contract No. 173-21 23-017) with Water Works Engineers, LLC for Design and Engineering Services During Construction for $125,172 from the Water Operating Fund (Fund 520) and the Sewer Operating Fund (Fund 530) for the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302) and the Water System Rehabilitation Project No. 4 (WA2403)

Submitted,

Page 208 ends

07/08/2025 Item No.10.
5 Marcus Yasutake, Director

ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT

Page 209 ends

07/08/2025 Item No.10.

Resolution No. 11420

Page 1 of 2 ends

RESOLUTION NO. 11420

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE
AMENDMENT NO. 2 TO THE AGREEMENT (CONTRACT NO. 173-21 23-017) WITH

WATER WORKS ENGINEERS, LLC FOR DESIGN AND ENGINEERING SERVICES DURING CONSTRUCTION FOR $125,172 FROM THE WATER OPERATING FUND (FUND 520) AND THE SEWER OPERATING FUND (FUND 530) FOR THE BASIN 4 PHASE 2 SEWER REHABILITATION PROJECT (WW2302) AND THE WATER SYSTEM REHABILITATION PROJECT NO. 4 (WA2403)

WHEREAS, the City of Folsom has identified these projects as a priority to maintain the integrity and operation of the sanitary sewer collection system and the water distribution system; and

WHEREAS, the infrastructure improvements identified in the Basin 4 Phase 2 Sewer Rehabilitation Project to enhance the City’s sanitary sewer collection system include rehabilitating and replacing sanitary sewer pipeline , manholes, and reconnection of sanitary sewer laterals on Leidesdorff Street, Canal Street, Sutter Street and Figueroa Street Alley, Figueroa Street, Figueroa Street and Mormon Street Alley, Mormon Street and Natoma Street Alley, and Persifer Street and Dean Way Alley; and

WHEREAS, the infrastructure improvements identified in the Water System Rehabilitation Project No. 4 to enhance the City’s water distribution system include rehabilitating and replacing water mainlines on Leidesdorff Street, Canal Street, a portion of Sibley Str eet between Mormon Street and Figueroa Street as well as miscellaneous water appurtenance work within the area of Orange Grove Way; and

WHEREAS, Water Works Engineers, LLC by reason of their knowledge and familiarity with the project, understanding of the b ackground and requirements of the project, and qualifications and experience of the project team, are qualified to perform the design and construction administration services; and

WHEREAS, the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302) is included in the FY 2025-26 Capital Improvement Plan with a total project budget within the Sewer Operating Fund (Fund 530) of $4,630,598; and

WHEREAS, sufficient funds are budgeted and available in the Sewer Operating Fund (Fund 530) in the amount of $80,238; and

WHEREAS, the Water System Rehabilitation Project No. 4 (WA2403) is included in the Fiscal Year 2025-26 Capital Improvement Plan with a total project budget within the Water Operating Fund (Fund 520) of $1,359,385; and

WHEREAS, sufficient funds are budgeted and available in the Water Operating Fund (Fund 520) in the amount of $44,934; and

Page 210 ends

07/08/2025 Item No.10.

Resolution No. 11420

Page 2 of 2 ends

WHEREAS, costs associated with the relocation of the storm drain line will be allocated to the Water Operating Fund (Fund 520) or the Sewer Operating Fund (Fund 530); and

WHEREAS, the EWR Department recommends approving Amendment No. 2 to the agreement with Water Works Engineers, LLC for $ 80,238 for the Basin 4 Phase 2 Sewer Rehabilitation Project and $ 44,934 for the Water System Rehabilitation Project No. 4 for a total amount of $125,172, and a new contract total amount not-to-exceed $558,850; and

WHEREAS, the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute Amendment No. 2 to the Agreement (Contract No. 173 - 21 23 -017) with Water Works Engineers, LLC for Design and Engineering Services During Construction for the Basin 4 Phase 2 Sewer Rehabilitation Project (WW2302) and the Water System Rehabilitation Project No. 4 (WA2403) for $125,172, and a new contract total not-to- exceed amount of $558,850.

PASSED AND ADOPTED this 8th day of July, 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

___________________________________
Sarah Aquino, MAYOR

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 211 ends

07/08/2025 Item No.10.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 212 ends

07/08/2025 Item No.10.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11421 – A Resolution Authorizing the City Manager to Execute an Agreement with Kimley Horn and
Associates, Inc. for Design Consulting Services for $242,580 from the Light Rail Impact Fee Fund (Fund 451) for the Traffic Signal Timing and Logic Statements for Light Rail Preemption Project, Project No. 8084, and Appropriation of Funds

FROM: Public Works Department

RECOMMENDATION / CITY COUNCIL ACTION

The Public Works Department recommends that the City Council pass and adopt Resolution No. 11421 – A Resolution Authorizing the City Manager to Execute an Agreement with Kimley Horn and Associates, Inc. for Design Consulting Services for $242,580 from the Light Rail Impact Fee Fund (Fund 451) for the Traffic Signal Timing and Logic Statements for Light Rail Preemption Project, Project No. 8084, and Appropriation of Funds.

BACKGROUND / ISSUE

Folsom Boulevard serves as a key north-south arterial route within the City of Folsom. Multiple intersections along this corridor are equipped with traffic signals that are regularly affected by light rail preemption due to the Sacramento Regional Transit (SacRT) Gold Line that runs parallel to the roadway. These preemption events disrupt signal timing coordination along the corridor, contributing to increased vehicular delay and reduced operational efficiency.

To address these issues, the City issued a Request for Proposals (RFP) to secure qualifie d traffic engineering services aimed at improving traffic signal coordination and functionality along Folsom Boulevard from Iron Point Road to Natoma Street. The project’s objectives include reviewing existing timing plans, developing updated signal coordi nation strategies, and preparing logic statements that define signal controller behavior under preemption events. The consultant will also

Page 213 ends

07/08/2025 Item No.11.

2 conduct simulation modeling to evaluate proposed changes, assist with field implementation, and deliver final documentation including timing sheets, logic diagrams, and performance evaluations.

POLICY / RULE

This project aligns with the City’s goals to improve traffic efficiency, reduce vehicle delay, and enhance multimodal coordination. The updates are consistent with the City’s adopted traffic engineering practices and support regional transportation strategies that promote effective integration of vehicular and transit operations , and the City’s General Plan Policy M4.1.3 which states that “the City will prioritize u se of smart technologies and innovative solutions, including roundabouts, that maximize efficiencies and safety.”

ANALYSIS

On March 19, 2025, Public Works staff prepared and released a Request for Proposal (RFP) from firms pre-selected on the City’s Engineering list. Two proposals were received in response to the RFP. A review panel consisting of City engineering staff separately evaluated and scored the received proposals based on criteria including relevant experience, qualifications of the proposed team, understanding of the project scope, and approach to the work. The methods of analysis are consistent with Chapter 10 of the Caltrans Local Assistance Project Manual requirements for consultant selection.

Kimley-Horn and Associates, Inc. received the highest overall score. Their proposal demonstrated superior qualifications in signal timing optimization, extensive experience with light rail preemption strategies, and a well -rounded team with strong technical expertise and past performance on similar projects. As a result, staff recommends awarding the contract to Kimley - Horn and Associates, Inc.

In accordance with California Public Contract Code § 4526, which mandates a qualifications-based selection process for professional services such as engineering and construction management, the City is prohibited from opening or considering sealed cost proposals during the evaluation phase, except for the firm ranked highest based on qualifications. Although Interwest Consulting Group voluntarily included their c ost proposal in their submittal, the City did not request, open, or evaluate this information while assessing qualifications, in full compliance with state law. Only after Kimley -Horn was identified as the top -ranked proposer was cost considered during negotiations. For transparency, it is noted that Interwest’s proposed fee of $210,000 is approximately 13.4% lower than Kimley-Horn’s; however, cost played no role in the qualifications evaluation or ranking process.

Firm Name Total Average Score
Kimley-Horn and Associates, Inc. 95
Interwest 73

Staff will use the City’s standard agreement in a form acceptable to the City Attorney.

FINANCIAL IMPACT

Page 214 ends

07/08/2025 Item No.11.

3 The contract with Kimley -Horn and Associates, Inc. would be authorized in the amount of $242,580.

Light Rail Project, Project 8084, is included in the FY 2025-26 Capital Improvement Plan, with a total project budget of $200,000 funded through the Light Rail Impact Fee Fund (Fund 451). Staff is requesting an appropriation in the amount of $42,580 from the Light Rail Impact Fee Fund (Fund 451) for this contract. Sufficient funds are available in the Light Rail Impact Fee Fund (Fune 451) to cover the requested appropriation.

ENVIRONMENTAL REVIEW

This project is categorically exempt from env ironmental review under the California Environmental Quality Act (CEQA), Section 15301 – Existing Facilities. The work involves minor alterations to existing traffic signal systems with no expansion of existing use, and all activities will occur within existing public rights-of-way.

ATTACHMENTS

1. Resolution No. 11421 – A Resolution Authorizing the City Manager to Execute an Agreement with Kimley Horn and Associates , Inc. for Design Consulting Services for $242,580 from the Light Rail Impact Fee Fund (Fund 451) for the Traffic Signal Timing and Logic Statements for Light Rail Preemption Project

2. Scope of Work – Folsom Boulevard Traffic Signal Timing Updates and Logic Statements for Light Rail Preemption

Submitted,

Marcus Yasutake, Interim Public Works Director

Page 215 ends

07/08/2025 Item No.11.

Attachment 1

Page 216 ends

07/08/2025 Item No.11.

Resolution No. 11421

Page 1 of 2 ends

RESOLUTION NO. 11421

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH KIMLEY HORN AND ASSOCIATES, INC. FOR DESIGN CONSULTING SERVICES FOR $242,580 FROM THE LIGHT RAIL IMPACT FEE FUND (FUND 451) FOR THE TRAFFIC SIGNAL TIMING AND LOGIC STATEMENTS FOR LIGHT RAIL PREEMPTION PROJECT, PROJECT NO. 8084, AND

APPROPRIATION OF FUNDS

WHEREAS, the City of Folsom Publ ic Works Department has identified the need to improve traffic signal coordination and light rail preemption functionality along the Folsom Boulevard corridor; and

WHEREAS, multiple intersections along Folsom Boulevard experience signal timing disruptions due to Sacramento Regional Transit (SacRT) Gold Line light rail preemptions, leading to increased vehicular delays and reduced operational efficiency; and

WHEREAS, the City issued a Request for Proposals (RFP) for design and consulting services to support traffic signal timing updates, development of logic statements for preemption events, and implementation assistance along the corridor between Iron Point Road and Natoma Street; and

WHEREAS, Kimley-Horn and Associates, Inc. submitted a proposal in respo nse to the RFP and was selected as the top-ranked consultant through a competitive evaluation process based on qualifications, experience, and technical approach; and

WHEREAS, the consulting contract will include a review and update of timing plans, development of updated signal coordination strategies, creation of logic statements for signal controller behavior under preemption, simulation modeling, field implementation assistance, and delivery of final documentation including timing sheets, logic diagram s, and performance evaluations; and

WHEREAS, the Light Rail Project, Project No. 8084, is included in the Fiscal Year 2025- 26 Capital Improvement Plan, utilizing the Light Rail Impact Fee Fund (Fund 451) with a total project budget of $200,000; and

WHEREAS, this contract will require an appropriation to the project in the amount of $42,580 from the Light Rail Impact Fee Fund (Fund 451); and

WHEREAS, sufficient funds are available in the Light Rail Impact Fee Fund (Fund 451) to cover the requested appropriation; and

WHEREAS, the agreement with Kimley -Horn and Associates, Inc. will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom

Page 217 ends

07/08/2025 Item No.11.

Resolution No. 11421

Page 2 of 2 ends

hereby authorizes the City Manager to execute a de sign and consulting services contract with Kimley-Horn and Associates, Inc. for $242,580 from the Ligh Rail Impact Fee (Fund 451) for the Traffic Signal Timing and Logic Statements for Light Rail Preemption Project, Project No. 8084.

NOW, THEREFORE, BE IT FURTHER RESOLVED that the Finance Director is authorized to appropriate $42,580 in the Light Rail Impact Fee Fund (Fund 451) and in the Traffic Signal Timing and Logic Statements for Light Rail Preemption Project, Project No. 8084, for the contract.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):
____________________________________
Sarah Aquino, MAYOR

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 218 ends

07/08/2025 Item No.11.

Attachment 2

Page 219 ends

07/08/2025 Item No.11.

City of Folsom Traffic Signal Timing Updates and Lo gic Statements for Light Rail Preemption Revised Scope of Work
Kimley-Horn 1
Scope of Work
Task 0: Project Management and Meetings
Task 0.1 Project Management

This task includes general project administration, including management of project staff, quality cont rol, and project accounting.

Kimley-Horn will submit monthly invoices with assoc iated project status reports for the effort complet ed each month. Project reports will include status updates on completed and ongoing project tasks, deliverable s completed, upcoming milestones, and potential const raints and risks to project progress.

Task 0.2 Kick-off and Project Coordination Meetings
Kimley-Horn will initiate this project with a Proje ct Kick-Off Meeting with City and Sacramento Region al Transit (SacRT) staff. This meeting will discuss the overal l project schedule and constraints, review scope of services elements, identify project coordination, discuss qu ality control, and review administrative and invoic ing procedures.

During the course of the project, we will conduct u p to eight (8) virtual project coordination meeting s with the City to review project schedule, budget, progress s tatus, and risks to the project. We will prepare an d distribute materials and notes for each meeting.

Kimley-Horn will prepare a project schedule identif ying key milestones, deliverables, and critical pat h tasks for the project. We will update the schedule throughout the project and have it available during meetings, or as requested.

Task 0 Deliverables:
• Meeting Notes, Agendas, and Meeting Materials
• Project Schedule (with updates)
• Monthly Invoices with Project Status Reports
Task 1: Data Collection and Existing Conditions Obs ervations Kimley-Horn shall be entitled to rely on the comple teness and accuracy of all information provided by the City and SacRT. Kimley-Horn will request the following i nformation from the City and SacRT for the purpose of performing the traffic operations analysis:
• Signal timing sheets
• Traffic signal as-built plans
• LRT as-built plans, including train detection, exis ting preemption logic, and equipment • LRT schedules, headways, and operating speeds withi n project limits • Available traffic count data
• Data from City’s ATSPM system, including cycles/spl its/offsets logs • Synchro network files (if available) for the projec t corridor, including existing signal timing parame ters for the seven signalized intersections

Page 220 ends

07/08/2025 Item No.11.

City of Folsom Traffic Signal Timing Updates and Lo gic Statements for Light Rail Preemption Revised Scope of Work
Kimley-Horn 2
Kimley-Horn will collect weekday, peak-period inter section turning movement counts (vehicles, bicycles , and pedestrians) at the seven (7) signalized intersecti ons along Folsom Boulevard between Iron Point Road and Natoma Street. The counts will be conducted on a ty pical weekday (Tuesday, Wednesday, or Thursday when local schools are in session) between the hours of 7-9 AM, 2-4 PM, and 4-6 PM.

Kimley-Horn will complete a site visit of the proje ct corridor to observe existing operations and lane configuration, vehicle storage lengths, existing tr affic control, speed limits, lane utilization, adja cent land uses, and other readily apparent features for the study f acilities that are deemed by Kimley-Horn to be rele vant to the scope of services. We will review existing traffic signal operations and light rail preemption, includ ing existing traffic signal logic operation (i.e., detection, ra il preemption, blank-out sign, overlaps). This site visit will be coordinated with City staff and SacRT.

Task 2: Traffic Signal Timing Updates
Kimley-Horn will analyze traffic signal and rail sy stem operations and develop recommendations for sig nal operational strategies to improve traffic flow and corridor progression while effectively managing lig ht rail preemption and maintaining safe and efficient inter section operations for all users. These operational enhancements may include modifications to signal co ordination plans corridor-wide, signal phasing duri ng rail preemption, preemption logic operation, time-out/ca ncel preemption functions, and other controller programming. Recommendations will address the integ ration of light rail operations with signal coordin ation plans, and may include adjustments to cycle lengths , splits, offsets, and transition strategies to mai ntain progression for vehicular traffic along Folsom Boul evard.

Kimley-Horn will provide marked up signal timing sh eets documenting recommended modifications as part of our deliverable for Task 4.

Task 3: Signage and Safety Assessment
Based on field observations during the site visit ( Task 1), Kimley-Horn will conduct a review of exist ing traffic control devices (including traffic signal infrastru cture and signing and striping) and safety assessme nt at the seven project intersections. This includes review a nd assessment of CA MUTCD compliant signing and str iping in development of intersection improvements to enha nce multi-modal safety.

We will review crash data along the project corrido r from the recently completed City of Folsom Local Road Safety Plan (LRSP), previously developed by Kimley- Horn. This assessment will include review of crash types, crash patterns, primary collision factors, severity levels, pedestrian or bicyclist involvement, and o ther information to inform recommended safety countermea sures and intersection improvements. This assessmen t will also include identification of geometric or vi sibility issues that may contribute to crash risk or present conflicts for vehicles, pedestrians, bicyclists, an d light rail operations.

Efforts completed in this task will be documented i n a technical memorandum format with graphics as de emed appropriate by Kimley-Horn. We will prepare and sub mit an electronic (PDF) version of the Draft Safety Assessment Memorandum to the City. Kimley-Horn will respond to a single set of consolidated, non-confl icting, and reasonable comments from the City on the Draft Memorandum. We will prepare and submit an electroni c (PDF) version of the Final Safety Assessment Memora ndum to the City.

Page 221 ends

07/08/2025 Item No.11.

City of Folsom Traffic Signal Timing Updates and Lo gic Statements for Light Rail Preemption Revised Scope of Work
Kimley-Horn 3
Task 3 Deliverables:
• Safety Assessment Memorandum (Draft and Final)
Task 4: Logic Statement Development
Kimley-Horn will evaluate the current corridor’s ra ilroad preemption operation to determine where dela ys and queues are increasing while the signal is in active railroad preemption. Kimley-Horn will consider usi ng the controller features provided by the Econolite’s EOS controller firmware, including utilizing peer-to-p eer through Ethernet communication and the City’s Centracs Cent ral Traffic Management System and the development o f logic statements with the local traffic controller. Kimley-Horn will evaluate railroad preemption oper ation for each intersection and consider the following to imp rove traffic signal operations before, during, and after railroad preemption operations:
• Implement queue cutter detection by programming add itional video detection zones via Iteris’s Vantage Vector Video Detection System.
o Queue cutter detection can be utilized to shorten a phase at its current intersection or an adjacent intersection through logic development and peer-to-peer communication. • Send an advance preemption input from an adjacent s ignal through peer-to-peer communication to clear the left-turn and side street queue prior to the arrival of the light rail. • Develop logic statements and modify railroad preemp tion settings to exit preemption operation more efficiently and return the signal and corridor back into step more efficiently. • Implement Cascade logic wherein the system detects approaching LRT and adjusts traffic signal timing offsets at downstream signals to maintain coordinat ion.

We will document recommended preemption logic and c ontroller programming adjustments in marked-up traffic signal as-built plans and timing sheets for each of the project intersections.

This scope of services does not include development of construction documents or specifications for infrastructure improvements.

Task 4 Deliverables:
• Signal timing sheet markups
• Signal as-built plan markups
Task 5: Simulation and Analysis
This task includes focused technical analyses to es tablish existing conditions and identify recommende d signal timing changes (with implementation of operational strategies and preemption logic). Kimley-Horn will complete a focused weekday AM and PM peak-hour intersection operations analysis including up to seven signalize d intersections. These analyses will include delay, L evel of Service (LOS), and queuing for the followin g scenarios:
• Existing (2025) Conditions
• Existing (2025) plus Proposed Project Conditions+
+ “Proposed Project” refers to the inclusion of th e operational strategies and preemption logic to be determined in Tasks 2 and 4, respectively.

Kimley-Horn will analyze the impacts of the propose d signal timing changes on corridor and intersectio n performance. Delay and LOS will be determined using methods defined in the Highway Capacity Manual, us ing

Page 222 ends

07/08/2025 Item No.11.

City of Folsom Traffic Signal Timing Updates and Lo gic Statements for Light Rail Preemption Revised Scope of Work
Kimley-Horn 4
appropriate traffic analysis software (VISSIM) and analysis procedures consistent with the City’s curr ent, published guidelines. Kimley-Horn will use EOS virt ual controller to program test operational schemes prior to simulating in VISSIM. The ring-barrier controller i n VISSIM will be configured to simulate signal cont rollers with preemption logic using the EOS virtual controller.

The primary purpose of this analysis will be to sim ulate preemption strategies to identify and inform the recommended operational strategies, including traff ic signal timing parameters and preemption logic.

Efforts completed in this task will be documented i n a technical memorandum format with graphics as de emed appropriate by Kimley-Horn. We will prepare and sub mit an electronic (PDF) version of the Draft Traffi c Operations Memorandum to the City. Kimley-Horn will respond to a single set of consolidated, non-confl icting, and reasonable comments from the City on the Draft Memorandum. We will prepare and submit an electroni c (PDF) version of the Final Traffic Operations Memor andum to the City.

Task 5 Deliverables:
• Traffic Operations Memorandum (Draft and Final)
Task 6: Implementation and Testing
Upon approval of final signal timing and logic stra tegies, Kimley-Horn will provide the City with tech nical assistance in bench testing and field implementatio n of the signal timing modifications. This task inc ludes field observations, fine-tuning, and troubleshooting as n eeded for proper operation of preemption logic. Thi s task includes up to 66 hours of bench testing and field support for implementation and fine tuning of signa l timing modifications.

Efforts completed in this task will be documented i n a technical memorandum format with graphics as de emed appropriate by Kimley-Horn. We will prepare and sub mit an electronic (PDF) version of the Draft Implem entation Memorandum to the City. Kimley-Horn will respond to a single set of consolidated, non-conflicting, and reasonable comments from the City on the Draft. We will prepare and submit an electronic (PDF) version of the Final Implementation Memorandum to the City. Final deliverables will also include updated (marked-up) signal timing sheets, as-built plans, and controller progr amming files (as applicable).

Task 6 Deliverables:
• Implementation Memorandum (Draft and Final)
• Signal Timing Sheet Markups
• As-Built Plan Markups
• Controller Programming Files

Page 223 ends

07/08/2025 Item No.11.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 224 ends

07/08/2025 Item No.11.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11422 - A Resolution Authorizing the City Manager to Execute an Agreement with Water Works Engineers, LLC for Pre-Design Services for $161,160 from the Sewer Operating Fund (Fund 530) for the Oak Avenue Lift Station and Force Main Project (WW2601)
FROM: Environmental and Water Resources Department

RECOMMENDATION / CITY COUNCIL ACTION

The Environmental and Water Resources Department recommends the City Council pass and adopt Resolution No. 11422 - A Resolution Authorizing the City Manager to Execute an Agreement with Water Works Engineers, LLC for Pre-Design Services for $161,160 from the Sewer Operating Fund (Fund 530) for the Oak Avenue Lift Station and Force Main Project (WW2601).

BACKGROUND / ISSUE

The Environmental and Water Resources (EWR) Department identifies sewer infrastructure rehabilitation and replacement projects through sewer master plans and ongoing sewer condition assessment programs. As part of the City’s Sewer System Management Plan fo r its wastewater collection system, the EWR Department performs ongoing condition assessments on the wastewater system and corrects any defects/deficiencies identified through this process. Through these efforts, City staff identified the Oak Avenue Lift Station and Force Main Project as needing improvements.

Currently, the Oak Avenue Parkway Sewer Lift Station has had several mechanical, electrical, and operational performance issues. Additionally, the existing 18-inch force main has failed twice due to longitudinal cracking caused by poor pipe bedding conditions during the original installation in 2002, resulting in costly emergency repairs and sanitary sewer spills in a high traffic area of the City.

Page 225 ends

07/08/2025 Item No.12.
2 In January 2025, the EWR Department completed the design and construction administration pre- qualification process and shortlisted ten engineering firms to provide on-call design and construction administration services. On March 21, 2025, the City issued a request for proposal for pre-design services for the Oak Avenue Lift Station and Force Main Project to all ten shortlisted on-call engineering firms. Of the ten firms, five firms chose to submit proposals to the City.

The pre-design report will serve as the basis for the future design effort of t he development of plans and specifications for the Oak Avenue Lift Station and Force Main Project. The pre-design approach is broken into the following components:

 Oak Avenue Lift Station Site Analysis
 Oak Avenue Force Main Alignment Alternatives
 Project Management
 Review Available Information and Perform Site Investigation  Geotechnical Desktop Study
 Preliminary Survey
 Preliminary Environmental Constraints
 Utility Coordination “A” Letters
 Pre-Design Alternatives Analysis and Workshop
 Pre-Design Report
 Schedule

This resolution will authorize the City Manager to execute an agreement with Water Works Engineers, LLC for Pre-Design Services for the Oak Avenue Lift Station and Force Main Project.

POLICY / RULE

In accordance with Chapter 2.36 of the Folsom Municipal Code, supplies, equipment, services, and construction with a value of $75,049 or greater shall be awarded by City Council.

ANALYSIS

On March 21, 2025, the City issued a request for proposals for the Pre-Design Services for the Oak Avenue Lift Station and Force Main Project. On May 14, 2025, EWR received five proposals from Domenichelli & Associates, Inc., HDR Engineering, Inc. , HydroScience Engineers, Inc. , Verdantas Inc. and Water Works Engineers, LLC.

The five proposals were evaluated by five EWR staff members for technical evaluation prior to reviewing project costs. The proposals were reviewed and scored for project understanding, qualifications, deliverables, and project team staffing. The technical evaluation scores are shown in Table 1.

Page 226 ends

07/08/2025 Item No.12.
3 Consultant EWR 1 EWR 2 EWR 3 EWR 4 EWR 5 Average
HydroScience Engineers Inc. 65 55 58 55 69 60.4
Water Works Engineers, LLC 60 69 70 65 65 65.8
Verdantas Inc. 52 61 53 53 63 56.4
HDR Engineering, Inc. 68 67 70 57 70 66.4
Domenichelli & Associates, Inc 52 58 53 61 60 56.8
Table 1: Consultant Technical Scores without Costs

After reviewing each proposal for project understanding, qualifications, deliverables, and project team staffing, the proposals were reviewed for project costs. The fee schedules for the scope of work outlined in the request for proposals from each consultant are shown in Table 2.

Consultant Hours Fee Amount Cost/Hour
HydroScience Engineers Inc. 664 $197,300 $297
Water Works Engineers, LLC 840 $161,160 $192
Verdantas Inc. 586 $131,021* $224
HDR Engineering, Inc. 924 $288,221 $312
Domenichelli & Associates, Inc 1,196 $306,088 $256
Table 2: Consultant Project Costs and Project Hours
*Corrected cost due to math errors in Proposal

Water Works Engineers, LLC was determined to provide the best value to the City based on the scope of work provided in their proposal, the project team, their expertise for these types of projects, the total fee amount and overall cost based on the assumed number of hours proposed to complete the work. Although Verdantas Inc. has the lowest project cost, the Water Works Engineers project team provided more experience and qualifications relevant to the type of work necessary for this project. Given the complexity of the location of this pump station and the force main, the experience and qualifications is critical in developing the best alternative to move forward with for the design. Staff also believes that the alternatives analysis for the pump station site and proposed pipeline alignment will require more hours than provided by Verdantas . When compared to the other proposals, the number of hours for the alternatives analysis provided by Verdantas was approximately 254 hours less. Table 3 shows the overall total scores including project costs based on a maximum score of 100.

Consultant
Technical
Score (Avg.) Cost Score Total Score
HydroScience Engineers Inc. 60.40 16.37 76.77
Water Works Engineers, LLC 65.80 22.66 88.46
Verdantas Inc. 56.40 23.23 79.63
HDR Engineering, Inc. 66.40 13.37 79.77
Domenichelli & Associates, Inc 56.80 14.72 71.52
Table 3: Consultant Overall Scoring Including Project Costs and cost per hour

This resolution will authorize the City Manager to execute an agreement with Water Works Engineers, Inc. for Pre-Design Services for the Oak Avenue Lift Station and Force Main Project for a not to exceed amount of $161,160.

Page 227 ends

07/08/2025 Item No.12.
4 FINANCIAL IMPACT

The Oak Avenue Lift Station and Force Main Project (WW2601) is included in the F iscal Year 2025-26 Capital Improvement Plan. Sufficient funds in the amount of $161,160 are budgeted and available in the Sewer Operating Fund (Fund 530).

ENVIRONMENTAL REVIEW

An environmental opportunities and constraints analysis will be performed as part of the design process. The analysis will include a general approach to the environmental compliance process, including a recommendation for any California Environmental Quali ty Act (CEQA) documentation and identification, identification of potentially required regulatory permits, and a general mitigation strategy and cost estimate.

ATTACHMENT

Resolution No. 11422 - A Resolution Authorizing the City Manager to Execute an Agreement with Water Works Engineers, LLC for Pre-Design Services for $161,160 from the Sewer Operating Fund (Fund 530) for the Oak Avenue Lift Station and Force Main Project (WW2601)

Submitted,

Marcus Yasutake, Director

ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT

Page 228 ends

07/08/2025 Item No.12.

Resolution No. 11422

Page 1 of 1 ends

RESOLUTION NO. 11422

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN

AGREEMENT WITH WATER WORKS ENGINEERS, LLC FOR PRE-DESIGN SERVICES FOR $161,160 FROM THE SEWER OPERATING FUND (FUND 530) FOR THE OAK AVENUE LIFT STATION AND FORCE MAIN PROJECT (WW2601)

WHEREAS, the Oak Avenue Parkway Lift Station has had several mechanical, electrical, and operational performance issues; and

WHEREAS, the existing 18-inch force main has failed twice due to l ongitudinal cracking caused by poor pipe bedding conditions during the original installation in 2002, resulting in costly emergency repairs and sanitary sewer spills in a high traffic area of the City; and

WHEREAS, the City has identified this project as a priority to maintain integrity and operation of the City’s sanitary sewer system; and

WHEREAS, Water Works Engineers, LLC by reason of their past experience, knowledge, and abilities for performing these types of services, are qualified to perform the required pre-design services for the project; and

WHEREAS, the Oak Avenue Lift Station and Force Main Project is included in the FY 2025-26 Capital Improvement Plan with a project budget of $768,000; and

WHEREAS, sufficient funds are budgeted and available in the Oak Avenue Lift Station and Force Main Project budget to accommodate the $161,160 cost of the agreement; and

WHEREAS, the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute an agreement with Water Works Engineers, LLC for Pre - Design Services for $161,160 from the Sewer Operating Fund (Fund 530) for the Oak Avenue Lift Station and Force Main Project (WW2601).

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):
___________________________________
Sarah Aquino, MAYOR

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 229 ends

07/08/2025 Item No.12.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 230 ends

07/08/2025 Item No.12.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11426 - A Resolution Authorizing the City Manager to Execute Construction Change Order No. 1 with Consolidated Engineering, Inc. (Contract 174 -21 25 -010) for the Pavement Repair and Resurfacing Project FY 24-25, Project No. 8017, in the amount of $ 588,232 from the SB1 Road Maintenance and
Rehabilitation Fund (Fund 235)

FROM: Public Works Department

RECOMMENDATION / CITY COUNCIL ACTION

The Public Works Department recommends that the City Council pass and adopt Resolution No. 11426 - A Resolution Authorizing the City Manager to Execute Construction Change Order No. 1 with Consolidated Engineering, Inc. (Contract 174 -21 25-010) for the Pavement Repair and Resurfacing Project FY 24-25, Project No. 8017, in the amount of $ 588,232 from the SB1 Road Maintenance and Rehabilitation Fund (Fund 235)

BACKGROUND / ISSUE

The Public Works Department manages the City of Folsom’s Street Overlay/Pavement Management Program, which is funded by annual allocations from both the SB1 Road Maintenance and Rehabilitation Fund (Fund 235) and the Measure A Fund (Fund 276). A total of $2,000,000 was allocated to the program for Fiscal Year 2024-25.

In April 2025, the City Council approved Resolution No. 11361 - A Resolution Authorizing the City Manager to Execute a Contract with Consolidated Engineering, Inc. for the Pavement Repair and Resurfacing Project FY 24-25 (Project No. 8017). The project is designed to utilize funds from the Street Overlay/Pavement Management Program to address the pavement repair and maintenance needs of the City.

Page 231 ends

07/08/2025 Item No.13.
2 The Engineer’s Estimate for the original bid was $1,900,000. In April 2025, the project was awarded to Consolidated Engineering, Inc. for a base bid amount of $1,408,999, with a total not - to-exceed amount of $1,549,898.90, which includes a ten percent contingency to accommodate potential change orders.

This change order will enable the inclusion of additional pavement repair and resurfacing work, specifically covering all remaining streets within the Briggs Ranch Neighborhood and the resurfacing of Stockman Circle. Consolidated Engineering, Inc. has agre ed to perform this additional work at the original unit bid prices, with an added cost solely for the extra traffic control measures required to support the expanded scope of work.

POLICY / RULE

Section 2.36.080, Award of Contracts of the Folsom Municipal Code states, in part, that contracts for supplies, equipment, services, and construction with an estimated value of $75,049 or greater shall be awarded by City Council.

ANALYSIS

The costs for the additional items of work are in line with the existing p roject unit prices and commonly expected costs for the various items of work being performed. City staff has reviewed all project changes and recommends approval of this project change order. The change order would be in the amount of $588,232.

FINANCIAL IMPACT

The City Council approval of Resolution No. 11361 authorized the execution of the original contract with Consolidated Engineering, Inc. for $1,408,999.00, with the project budgeted for a total not to exceed amount of $1,549,898.90, which included a ten percent contingency for potential change orders. This Construction Change Order, if approved, will authorize an additional amount of $588,232.00 for a total not-to-exceed contract amount of $2,138,130.90. No additional contingency is being requested.

Because the pavement repair and resurfacing work identified in the change order is in addition to the work outlined in the original contract, staff recommends not using the ten percent contingency to fund the change order and rather keep the contingency a vailable for its intended use to cover unexpected costs due to unforeseen site conditions. There is $ 588,232 budgeted and available in the Street Overlay/Pavement Management Project, Project No. 8017, for Fiscal Year 202 5-26, utilizing the SB1 Road Maintena nce and Rehabilitation Fund (Fund 235) for this Construction Change Order.

ENVIRONMENTAL REVIEW

This project has been deemed categorically exempt from environmental review.

Page 232 ends

07/08/2025 Item No.13.
3 ATTACHMENTS

1. Resolution No. 11426 - A Resolution Authorizing the City Manager to Execute Construction Change Order No. 1 with Consolidated Engineering, Inc. (Contract 174-21 25-010) for the Pavement Repair and Resurfacing Project FY 24-25, Project No. 8017, in the amount of $588,232 from the SB1 Road Maintenance and Rehabilitation Fund (Fund 235)

2. Pavement Repair and Resurfacing FY 2024 -25 Project Map (Original and Extra Work Locations)

Submitted,

Marcus Yasutake, INTERIM PUBLIC WORKS DIRECTOR

Page 233 ends

07/08/2025 Item No.13.

Attachment 1

Page 234 ends

07/08/2025 Item No.13.

Resolution No. 11426

Page 1 of 1 ends

RESOLUTION NO. 11426

A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE CONSTRUCTION CHANGE ORDER NO. 1 WITH
CONSOLIDATED ENGINEERING, INC. (CONTRACT 174-21 25-010) FOR THE PAVEMENT REPAIR AND RESURFACING PROJECT FY 24-25, PROJECT NO. 8017, IN THE AMOUNT OF $588,232
FROM THE SB1 ROAD MAINTENANCE AND REHABILITATION FUND
(FUND 235)

WHEREAS, the City Council approved a contract with Consolidated Engineering, Inc. in April 2025 for the Pavement Repair and Resurfacing Project FY 24-25, Project No. 8017; and

WHEREAS, staff has identified several additional locations in need of pavement repairs and maintenance; and

WHEREAS, Consolidated Engineering, Inc. submitted a proposal for $588,232 for the additional work; and

WHEREAS, funds in the amount of $ 588,232 are budgeted and available in the Street Overlay/Pavement Management Project, Project No. 8017, utilizing the SB1 Road Maintenance and Rehabilitation Fund (Fund 235); and

WHEREAS, the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute a construction change order with Consolidated Engineering, Inc. for the Pavement Repair and Resurfacing Project FY 24-25, Project No. 8017, in the amount of $588,232, for a total not to exceed amount of $2,138,130.90

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

___________________________________
Sarah Aquino, MAYOR
ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 235 ends

07/08/2025 Item No.13.

Attachment 2

Page 236 ends

07/08/2025 Item No.13.

Page 237 ends

07/08/2025 Item No.13.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 238 ends

07/08/2025 Item No.13.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Resolution No. 11429- A Resolution Authorizing the City Manager to Execute Amendment No. 3 to the Train Concession Agreement Between the City of Folsom and Truson V. Buegel and Stephanie Bea Roy to Extend the Agreement for an Additional Five Years

FROM: Parks and Recreation Department

RECOMMENDATION / CITY COUNCIL ACTION

Staff recommends the City Council approve Resolution No. 11429- A Resolution Authorizing the City Manager to Execute Amendment No. 3 to the Train Concession Agreement Between the City of Folsom and Truson V. Buegel and Stephanie Bea Roy to Extend the Agreement for an Additional Five Years.

BACKGROUND / ISSUE

Folsom City Lions Park, located at 403 Stafford Street, has served as the site for the scale live- steam train railway since 1970. Terry and Geri Gold, dba Folsom Valley Railway, aka Golden Spike Entertainment, acquired the train concession from the previous owner in the early 1990s and had operated as the concessionaire since then. Golden Spike Entertainment owned and operated the complete railway, equipment, and structures apart from the boarding platform that is owned by the City.

In February 2008, staff conducted a Request for Proposals (RFP) for the Scale Live-Steam Train and Snack Bar Concessions. Terry and Geri Gold, dba Golden Spike Entertainment, submitted a proposal for both the Scale Live-Steam Train and Snack Bar Concessions, while the City of Folsom Zoo Sanctuary submitted a proposal for the Snack Bar Concession operations only.

Page 239 ends

07/08/2025 Item No.14.
2 Subsequently, at the October 27, 2009, City Council Meeting, the Council passed Resolution No. 8572 authorizing the City Manager to Execute a Train Concession Agreement with Golden Spike Entertainment at Folsom City Lions Park. The Snack Bar Concessions were awarded to the City of Folsom Zoo Sanctuary. The current agreement with Golden Spike Entertainment for the train operations expired on December 31, 2024.

In February 2024, staff requested direction from the City Council on the future of the steam train operations at Folsom City Lions Park. During the meeting, Terry Gold presented the City Council with information regarding potential buyers for the operation. During the discussion, the City Council expressed unanimous support for the continuation of train operations under new ownership.

Subsequently, Terry and Geri Gold met with all prospective buyers and identified Truson V.

Buegel and Stephanie Bea Roy as the chosen buyers. Mr. Buegel’s selection was based on his extensive expertise in steam train operations and maintenance and for his tenure operating trains at Disneyland Park.

On June 11, 2024, the City Council approved Resolution No. 11213 authorizing the City Manager to execute an assignment and assumption agreement for the continued operation of the train by Truson V. Buegel and Stephanie Bea Roy. The agreement was finalized with City signatures on December 9, 2024. The existing agreement assumed by Truson V. Buegel and Stephanie Bea Roy has one remaining five-year extension available.

POLICY / RULE

All powers of the City shall be vested in the City Council except as otherwise provided by the City Charter. Section 2.02 of the City Charter.

ANALYSIS

Truson V. Buegel and Stephaine Bea Roy have successfully operated the train for the last year.

Staff believe that an extension of the existing contract is in the best interest of the City and will ensure continued operation of the train for park and Zoo Sanctuary users. The total revenue over the five-year term is estimated at $132,945.

FINANCIAL IMPACT

Year one revenue is estimated at $25,040 with a 3% escalator each year thereafter.

ENVIRONMENTAL REVIEW

The recommended action of the City Council is not a project as defined by the California Environmental Quality Act (CEQA) and therefore does not require environmental review.

Page 240 ends

07/08/2025 Item No.14.
3 ATTACHMENTS

1. Resolution No. 11429- A Resolution Authorizing the City Manager to Execute Amendment No. 3 to the Train Concession Agreement Between the City of Folsom and Truson V. Buegel and Stephanie Bea Roy to Extend the Agreement for an Additional Five Years

Submitted,

Kelly Gonzalez, Parks & Recreation Director

Page 241 ends

07/08/2025 Item No.14.

Resolution No. 11429

Page 1 of 2 ends

RESOLUTION NO. 11429

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE
AMENDMENT NO. 3 TO THE TRAIN CONCESSION AGREEMENT BETWEEN THE CITY OF FOLSOM AND TRUSON V. BUEGEL AND STEPHANIE BEA ROY TO

EXTEND THE TERM OF THE AGREEMENT FOR AN ADDITIONAL FIVE YEARS

WHEREAS, Folsom City Lions Park, located at 403 Stafford Street, has hosted the scale live-steam train railway since 1970, with Terry and Geri Gold, operating as Folsom Va lley Railway, dba Golden Spike Entertainment, acquiring the train concession in the early 1990s and overseeing operations since, excluding the boarding platform owned by the City; and

WHEREAS, in February 2008, city staff issued a Request for Proposals (RFP) for the Scale Live-Steam Train and Snack Bar Concessions, resulting in Terry and Geri Gold, dba Golden Spike Entertainment, submitting a proposal for both concessions, while the City of Folsom Zoo Sanctuary submitted a proposal solely for the Snack Bar Concession; and

WHEREAS, on October 27, 2009, City Council passed Resolution No. 8572, authorizing the City Manager to execute a Train Concession Agreement with Golden Spike Entertainment, with the Snack Bar Concessions awarded to the Folsom City Zoo Sanctuary, and the current agreement with Golden Spike Entertainment expired on December 31, 2024; and

WHEREAS, on June 11, 2024, City Council approved Resolution No. 11213 authorizing the City Manager to execute an assignment and assumption agreement for the continued operation of the train by Truson V. Buegel and Stephanie Bea Roy; and

WHEREAS, the final assignment and assumption agreement was signed by City staff on December 9, 2024; and

WHEREAS, the agreement assumed by Truson V. Buegel and Stephanie Bea Roy has one existing five-year extension available; and

WHEREAS the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute amendment no. 3 to the concession agreement at Folsom City Lions Park with Truson V. Buegel and Stephanie Bea Roy extending the agreement period to December 31, 2029.

Page 242 ends

07/08/2025 Item No.14.

Resolution No. 11429

Page 2 of 2 ends

PASSED AND ADOPTED this 8th day of July, 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

___________________________________
Sarah Aquino, MAYOR

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 243 ends

07/08/2025 Item No.14.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 244 ends

07/08/2025 Item No.14.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Consent Calendar
SUBJECT: Mangini Ranch Trails Project
a. Resolution No. 11430– A Resolution Denying the Bid
Protest from Dutch Contracting Inc
b. Resolution No. 11432 – A Resolution Authorizing the
City Manager to Execute a Construction Agreement
with Consolidated Engineering Inc. for the Mangini
Ranch Trails Project, to be Funded by Fund 472 –
Folsom Plan Area Capital Fund, Including: (1) a
Construction Agreement with Consolidated Engineering
Inc. in the Amount of $2,774,608; (2) a 10%
Construction Contingency in the Amount of $277,461;
and (3) Appropriation of Funds in the Amount of
$289,035 to cover additional costs not allocated
c. Resolution No. 11433 - A Resolution Authorizing the
City Manager to Execute a Professional Services
Agreement with Kimley-Horn and Associates in the
Amount of $29,640 for Construction Engineering
Support Services, to be Funded by Fund 472 – Folsom
Plan Area Capital Fund
d. Resolution No. 11434 – A Resolution Authorizing the
City Manager to Execute a Professional Services
Agreement with Pinnacle Project Management in the
Amount of $99,000 for Construction Management
Services, to be Funded by Fund 472 – Folsom Plan Area
Capital Fund

FROM: Parks and Recreation Department

Page 245 ends

07/08/2025 Item No.15.
2 RECOMMENDATION / CITY COUNCIL ACTION
The Parks & Recreation Department recommends that the City Council pass and adopt the following resolutions:
a. Resolution No. 11430 – A Resolution Denying the Bid Protest from Dutch Contracting Inc
b. Resolution No. 11432 – A Resolution Authorizing the City Manager to Execute a Construction Agreement with Consolidated Engineering Inc. for the Mangini Ranch Trails Project, to be Funded by Fund 472 – Folsom Plan Area Capital Fund, Including: (1) a Construction Agreement with Consolidated Engineering Inc. in the Amount of $2,774,608; (2) a 10% Construction Contingency in the Amount of $277,461; and (3) Appropriation of Funds in the Amount of $289,035 to cover additional costs not allocated
c. Resolution No. 11433 Authorizing the City Manager to Execute a Professional Services Agreement with Kimley-Horn and Associates in the Amount of $29,640 for Construction Engineering Support Services, to be Funded by Fund 472 – Folsom Plan Area Capital Fund
d. Resolution No. 11434 Authorizing the City Manager to Execute a Professional Services Agreement with Pinnacle Project Management in the Amount of $99,000 for Construction Management Services, to be Funded by Fund 472 – Folsom Plan Area Capital Fund

BACKGROUND / ISSUE
The Mangini Ranch Trails Project is located within the Folsom Plan Area Specific Plan (FPA), specifically in the Mangini Ranch development area bounded by Alder Creek Parkway to the north, Savannah Parkway to the east, East Bidwell Street to the west, and White Rock Road to the south. The FPA includes over 30 miles of planned trails. Currently, there are approximately 10 miles of trails already constructed in the FPA. The project would construct approximately 2.5 miles of trails within the Mangini Ranch development area. The trail alignments through this new residential development were approved as part of the FPA and the Mangini Ranch development project approvals.

On September 14, 2021, City Council awarded a design contract ($180,239.50) to Kimley- Horn and Associates (KHA) for engineering and design services for the Mangini Ranch Trails project in the FPA. KHA prepared design development, engineering, construction documentation and project specifications for the construction bid of Mangini Ranch Trails.

As part of Folsom’s FY 2022-23 budget, the Mangini Ranch Trails project was allocated $2,200,000 for construction. Additionally in the FY 2024-25 budget, the project was allocated another $1,000,000, for a total approved project budget of $3,380,240 in the Folsom Plan Area Mangini Ranch Trails Project (Project PK2201).

On July 9, 2024, the City Council approved Contract Amendment #1 to the KHA contract in the amount of $31,734 to include two additional trail improvement areas in the design that

Page 246 ends

07/08/2025 Item No.15.
3 were outside of the original scope of services.

On November 12, 2024, the City Council approved Contract Amendment #2 to the KHA contract in the amount of $143,944.50 to conduct a Feasibility Study to determine the viability of an overcrossing or undercrossing in place of the proposed at grade crossing of East Bidwell Street.

POLICY / RULE
Section 2.36.080, Award of Contracts, of the Folsom Municipal Code states, in part, that contracts for supplies, equipment, services, and construction with an estimated value of $75,049 or greater shall be awarded by City Council.

ANALYSIS
Parks & Recreation Department staff prepared the construction bid package and solicited bids via the City website and www.publicpurchase.com. The project was issued for bids on May 1, 2025. A total of five bids were received on June 12, 2025.

The five base bids received are:
 Consolidated Engineering, Inc. $2,774,608
 Dutch Contracting, Inc. $2,940,563
 JPB Design, Inc. $3,056,925
 B&M Civil, LLC $3,549,135
 Central Valley Engineering & Asphalt, Inc. $4,157,469

Staff reviewed the five submittals and found the bid from Consolidated Engineering to be the lowest responsive bid for the Mangini Ranch Trails Project. The Engineer’s Estimate for this project was $2,900,000. The Parks & Recreation Department found the bid and submittal by Consolidated Engineering to be in order and intended to recommend that the contract be awarded to the responsive low-bidder, Consolidated Engineering Inc. Before staff issued a Notice of Intent to Award, a bid protest was received.

In addition to the contracts with Consolidated Engineering Inc, KHA, and Pinnacle Project Management (PPM), staff also included $100,000 in soft costs to the construction budget (staff time, materials testing, environmental monitoring). Per the City Manager’s direction, staff was asked to charge time spent on the Project to Fund 472 – Folsom Plan Area Capital Fund, estimated to be approximately $50,000 for the entirety of construction. Materials testing, in the estimated amount of $24,500, was also included in the soft costs to cover any required field testing of materials during construction. In addition, the Project is required to comply with the Folsom Plan Area Specific Plan Mitigation and Monitoring Reporting Program (MMRP). To comply, staff contacted Helix Environmental Planning for an environmental monitoring scope of services and received a proposal in the amount of $25,500. All soft costs fall below the City Manager’s signing authority of $75,049 and would not need City Council approval but are being included here to help provide a complete disclosure of all anticipated costs for this Project.

Page 247 ends

07/08/2025 Item No.15.
4 Bid Protest
On June 17, 2025, staff received a bid protest from Dutch Contracting Inc. (Attachment 9).

In the email to staff, Dutch Contracting Inc stated the following:

1. As outlined in Section 2.07, the City is required to award the project to the lowest responsive and responsible bidder who demonstrates the requisite experience, financial stability, facilities, and management capabilities to execute the project successfully and on schedule. Dutch Contracting Inc. maintains that Consolidated Engineering Inc. does not meet these critical criteria.

2. Their previous contract—Willow Creek Bridge (bid date: February 8, 2024) for Amador County—was awarded at just under $2 million. Reports indicate that the contractor is significantly behind schedule, struggling to meet contractual requirements, and facing liquidated damages of $6,300 per calendar day.

Additionally, at least one subcontractor has sought and been granted contract relief due to mismanagement.

3. Based on our research, this project would be the largest undertaken by Consolidated Engineering Inc. to date.

4. To protect taxpayer interests, we urge the City to exercise due diligence under Section

2.07 and require the three lowest bidders to submit statements of experience and business standing and/or financial statements.

On June 19, 2025, Consolidated Engineering Inc. (CEI) submitted a bid protest response with supporting documentation (Attachment 10). The bid protest response includes the following:

1. "Based on our research, this project would be the largest undertaken by Consolidated Engineering Inc. to date." This is False, CEI's largest project to date is with the City of Pittsburg and the current contract amount to date is $3,825,342.25.

2. "Reports indicate that the contractor is significantly behind schedule, struggling to meet contractual requirements, and facing liquidated damages of $6,300 per calendar day." This is false, the project is behind schedule, but not due to CEI's lack of management. The project is now ahead of our original projected workday window and is expected to be complete by October 2025.

3. "Additionally, at least one subcontractor has sought and been granted contract relief due to mismanagement." This is false, the only subcontractor that has sought to be granted relief from their contract decided to close their business (Big B Construction).

4. CEI has been established for over 9 years in the heavy civil industry and exclusively in the public works sector for over 5 years. CEI has never had a bond claim in the history of the company. CEI can provide over 100 references for successfully completed projects in the past 5 years.

After receiving the bid protest response from Consolidated Engineering, staff reached out to Amador County to verify statements made in Dutch Contracting bid protest and Consolidated Engineering’s bid protest response. On Thursday June 19, 2025, staff spoke with Jeff Christman of Amador County about the Willow Creek Bridge project referenced in Dutch

Page 248 ends

07/08/2025 Item No.15.
5 Contracting Inc. bid protest. The following is a synopsis of our conversation:

Spoke with Jeff Christman from Amador County about the bridge project referenced in Dutch Contracting bid protest. Jeff stated that Amador County had no issues with Consolidated Engineering work on the Willow Creek Bridge Project. The reference in Dutch’s bid protest to the sub-contractor leaving was not 100% true. The sub (Big B Concrete) left the project because he was retiring and getting out of the construction business. Environmental permitting was the reason the project was shut down for the winter. The reference to liquidated damages is not true. Consolidated Engineering has a very good working relationship with Amador County. No issues with Consolidated Engineering work in previous projects in the County. The project was supposed to restart June 2nd, but there was a bird nesting in a culvert and water was still flowing in the creek. The project restarted on June 9th.

After reviewing the bid protest, bid protest response, and correspondence with Amador County, staff believe the bid protest lacks merit and recommends denial.

The Project will require construction design support from Kimley-Horn and Associates (KHA) and construction management services from Pinnacle Project Management (PPM).

During construction of the Mangini Ranch trails, the City is requesting continued design support from KHA. The existing KHA contract includes unused hours from Contract Amendment #2 that will be used for the project construction support services. Kimley-Horn and Associates will provide the Scope of Services on a labor fee plus expense basis.

Including the hours from Contract Amendment #2, the construction support services scope will be performed for the additional not to exceed amount of $29,640 (Attachment 7).

The City has selected Pinnacle Project Management (PPM) to perform construction management duties for the Mangini Ranch Trail project. The City of Folsom currently partners with PPM for construction management oversight within the Folsom Plan Area development. Pinnacle recently provided excellent construction management and City representation for the successful Phase 1 trails project, constructed by Toll Brothers in the Regency development. While industry standard construction management contract values typically range from 10% to 20% of the total construction cost, the City sought to maximize public funding and achieve significant economies of scale. We requested a scope and fee from PPM aligned with their current qualifications and the project's needs.

PPMs scope of services for the project includes a not to exceed amount of $99,000 (Attachment 8), representing approximately 3.5% of the total construction cost, which demonstrates exceptional value and substantial savings for this project. This fee ensures proper inspection, documentation, and implementation of the City’s plans, standards, and municipal code. Therefore, staff recommends that the City Council approve this work as an amendment to the existing contract with PPM.

Based on the foregoing, the attached resolutions would deny the bid protest from Dutch

Page 249 ends

07/08/2025 Item No.15.
6 Contracting Inc and authorize the City Manager to execute a construction agreement with Consolidated Engineering Inc for the construction of the Mangini Ranch Trails Project and Appropriation of Funds. Staff will use the City’s standard construction agreement in a form acceptable to the City Attorney.

FINANCIAL IMPACT
The current approved project budget for Mangini Ranch Trails is $3,380,240, therefore an additional appropriation in the amount of $289,035 will be required for a new total project budget of $3,669,275. The revised project budget includes the contracts with Consolidated Engineering Inc ($2,774,608), a 10% budget contingency ($277,461), Kimley-Horn and Associates ($26,640), Pinnacle Project Management ($99,000), , and soft costs (staff time, materials testing, environmental monitoring, etc.) estimated to be $100,000, plusall previously spent and encumbered funds noted in the Total Existing Contracts line item in the table below. The additional appropriation will be from the Folsom Plan Area Capital Fund (Fund 472). Sufficient funds are available in the Folsom Plan Area Capital Fund (Fund 472) for this appropriation,

ENVIRONMENTAL REVIEW
The City, as lead agency, previously certified an EIR/EIS for the Folsom Plan Area Specific Plan (FPASP). Subsequently, the City determined that the Mangini Ranch Subdivision project, including the Mangini Ranch Trails, was entirely consistent with the FPASP. In reviewing this project, staff has determined that none of the events specified in Public Current A pproved Project B udg et $3,380,240.00
K HA Design C ontract $180,239.50
KHA Amendment #1 $31,734.00
KHA Amendment #2 $143,944.50
A Z C O: S avannah P kwy T raffic L ight P oles/B olts$35,648.01 T otal E xisting Contracts $391,566.01
Proposed Construction B udg et
C onstruction B id (C onsolidated E ngineering) $2,774,608.00 C onstruction C ontingency (10% ) $277,460.80
K HA C onstruction S upport $26,640.00
P P M C onstruction Management $99,000.00
S oft C osts* $100,000.00
T otal P roposed Construction B udg et $3,277,708.80
T otal P roposed P roject B udg et$3,669,275
A dditional B udg et A ppropriation Needed$289,035
Mang ini R anch T rails B udg et
* S taff T ime, Materials T esting , E nvironmental Monitoring , etc.

Page 250 ends

07/08/2025 Item No.15.
7 Resources Code section 21166 has occurred. Therefore, the proposed project is exempt from CEQA as previously determined CEQA Guidelines section 15182.

ATTACHMENTS

1. Resolution No. 11430 – A Resolution Denying the Bid Protest from Dutch Contracting Inc

2. Resolution No. 11432 – A Resolution Authorizing the City Manager to Execute a Construction Agreement with Consolidated Engineering Inc. for the Mangini Ranch Trails Project, to be Funded by Fund 472 – Folsom Plan Area Capital Fund, Including:
(1) a Construction Agreement with Consolidated Engineering Inc. in the Amount of $2,774,608; (2) a 10% Construction Contingency in the Amount of $277,461; and (3) Appropriation of Funds in the Amount of $289,035 to cover additional costs not allocated

3. Resolution No. 11433 Authorizing the City Manager to Execute a Professional Services Agreement with Kimley-Horn and Associates in the Amount of $29,640 for Construction Engineering Support Services, to be Funded by Fund 472 – Folsom Plan Area Capital Fund

4. Resolution No. 11434 Authorizing the City Manager to Execute a Professional Services Agreement with Pinnacle Project Management in the Amount of $99,000 for Construction Management Services, to be Funded by Fund 472 – Folsom Plan Area Capital Fund

5. Consolidated Engineering Inc. Bid

6. Mangini Ranch Trails Construction Bids Tabulation Table

7. Kimley-Horn and Associates Contract Amendment #3 Scope of Services

8. Pinnacle Project Management Scope of Services

9. Dutch Contracting Inc Bid Protest Email

10. Consolidated Engineering Inc. Bid Protest Response

11. Trails Map

Submitted,

Kelly Gonzalez, Parks & Recreation Director

Page 251 ends

07/08/2025 Item No.15.

Attachment 1

Page 252 ends

07/08/2025 Item No.15.

Resolution No. 11430

Page 1 of 2 ends

RESOLUTION NO. 11430

A RESOLUTION DENYING THE BID PROTEST FROM DUTCH CONTRACTING INC

WHEREAS, the Folsom Plan Area Specific Plan includes over 30 miles of planned trails, including the future Mangini Ranch Trails bounded by Alder Creek Parkway to the north, Savannah Parkway to the east, East Bidwell Street to the west, and White Rock Road to the south; and

WHEREAS, the future Mangini Ranch Trails will connect residents in the Mangini Ranch residential community to parks, schools, and other neighborhoods in the Folsom Plan Area; and

WHEREAS, plans and specifications were prepared for this work and publicly advertised for bids on May 1, 2025 and bids were opened on June 12, 2025; and

WHEREAS, Consolidated Engineering Inc. was the lowest responsible, responsive bidder; and

WHEREAS, a bid protest was submitted from Dutch Contractors Inc stating that Consolidated Engineering failed to demonstrate the required minimum level of project experience; and

WHEREAS, The City Council has reviewed the protest and is of the opinion that Consolidated Engineering is a responsive and responsible bidder for Mangini Ranch Trails Project; and

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Folsom to deny the Dutch Contracting Inc bid protest on the grounds that Consolidated Engineering is the lowest responsive and responsible bidder.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

____________________________________
Sarah Aquino, MAYOR
ATTEST:

Page 253 ends

07/08/2025 Item No.15.

Resolution No. 11430

Page 2 of 2 ends

Christa Freemantle, CITY CLERK

Page 254 ends

07/08/2025 Item No.15.

Attachment 2

Page 255 ends

07/08/2025 Item No.15.

Resolution No. 11432

Page 1 of 2 ends

RESOLUTION NO. 11432

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A
CONSTRUCTION AGREEMENT WITH CONSOLIDATED ENGINEERING INC. FOR THE MANGINI RANCH TRAILS PROJECT, TO BE FUNDED BY FUND 472 – FOLSOM PLAN AREA CAPITAL FUND, INCLUDING: (1) A CONSTRUCTION AGREEMENT WITH CONSOLIDATED ENGINEERING INC. IN THE AMOUNT OF $2,774,608; (2) A 10% CONSTRUCTION CONTINGENCY IN THE AMOUNT OF $277,461; AND (3) APPROPRIATION OF FUNDS IN THE AMOUNT OF $289,035 TO

COVER ADDITIONAL COSTS NOT ALLOCATED

WHEREAS, the Folsom Plan Area Specific Plan includes over 30 miles of planned trails, including the future Mangini Ranch Trails bounded by Alder Creek Parkway to the north, Savannah Parkway to the east, East Bidwell Street to the west, and White Rock Road to the south; and

WHEREAS, the future Mangini Ranch Trails will connect residents in the Mangini Ranch residential community to parks, schools, and other neighborhoods in the Folsom Plan Area; and

WHEREAS, plans and specifications were prepared for this work, publicly advertised for bids on May 1, 2025, and bids were opened on June 12, 2025; and

WHEREAS, Consolidated Engineering Inc. was the lowest responsible, responsive bidder; and

WHEREAS, the Folsom Plan Area Mangini Ranch Trails project (PK2201) was included in the FY 2025-26 Capital Improvement Plan, however an additional appropriation in the amount of $289,035 is needed for a revised project budget of $3,669,275 and funds are available in the Folsom Plan Area Capital Fund (Fund 472); and

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Folsom that the City Manager is authorized to execute a construction agreement with Consolidated Engineering Inc, for construction of the Folsom Plan Area Mangini Ranch Trails Project (PK2201) in the amount of $2,774,608 and a 10% construction contingency in the amount of $277,461.

BE IT FURTHER RESOLVED that the Chief Financial Officer is authorized to appropriate $289,035 in the Folsom Plan Area Capital Fund (Fund 472) to the Folsom Plan Area Mangini Ranch Trails Project (PK2201) for a total project budget of $3,669,275.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

Page 256 ends

07/08/2025 Item No.15.

Resolution No. 11432

Page 2 of 2 ends

ABSTAIN: Councilmember(s):

____________________________________
Sarah Aquino, MAYOR
ATTEST:

Christa Freemantle, CITY CLERK

Page 257 ends

07/08/2025 Item No.15.

Attachment 3

Page 258 ends

07/08/2025 Item No.15.

Resolution No. 11433

Page 1 of 2 ends

RESOLUTION NO. 11433

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A

PROFESSIONAL SERVICES AGREEMENT WITH KIMLEY-HORN AND
ASSOCIATES IN THE AMOUNT OF $29,640 FOR CONSTRUCTION ENGINEERING SUPPORT SERVICES, TO BE FUNDED BY FUND 472 – FOLSOM PLAN AREA

CAPITAL FUND

WHEREAS, the Folsom Plan Area Specific Plan includes over 30 miles of planned trails, including the future Mangini Ranch Trails bounded by Alder Creek Parkway to the north, Savannah Parkway to the east, East Bidwell Street to the west, and White Rock Road to the south; and

WHEREAS, the future Mangini Ranch Trails will connect residents in the Mangini Ranch residential community to parks, schools, and other neighborhoods in the Folsom Plan Area; and

WHEREAS, Kimley-Horn and Associates is most qualified to provide specialized construction design services due to the engineering and design work completed for the Mangini Ranch Trails project; and

WHEREAS, sufficient funds are budgeted and available in the Folsom Plan Area Mangini Ranch Trails Project (PK2201) for the cost of the construction design services.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Folsom that the City Manager is authorized to execute a Professional Services Agreement with Kimley- Horn and Associates, in a form acceptable to the City Attorney, for construction design services for the Folsom Plan Area Mangini Ranch Trails Project (PK2201) for a total not-to-exceed amount of $29,640.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

____________________________________
Sarah Aquino, MAYOR
ATTEST:

Page 259 ends

07/08/2025 Item No.15.

Resolution No. 11433

Page 2 of 2 ends

Christa Freemantle, CITY CLERK

Page 260 ends

07/08/2025 Item No.15.

Attachment 4

Page 261 ends

07/08/2025 Item No.15.

Resolution No. 11434

Page 1 of 2 ends

RESOLUTION NO. 11434

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A

PROFESSIONAL SERVICES AGREEMENT WITH PINNACLE PROJECT
MANAGEMENT IN THE AMOUNT OF $99,000 FOR CONSTRUCTION
MANAGEMENT SERVICES, TO BE FUNDED BY FUND 472 – FOLSOM PLAN AREA

CAPITAL FUND

WHEREAS, the Folsom Plan Area Specific Plan includes over 30 miles of planned trails, including the future Mangini Ranch Trails bounded by Alder Creek Parkway to the north, Savannah Parkway to the east, East Bidwell Street to the west, and White Rock Road to the south; and

WHEREAS, the future Mangini Ranch Trails will connect residents in the Mangini Ranch residential community to parks, schools, and other neighborhoods in the Folsom Plan Area; and

WHEREAS, Pinnacle Project Management is most qualified to provide specialized construction management services due to the ir current contract with the City of Folsom for construction management oversight within the Folsom Plan Area development; and

WHEREAS, sufficient funds are budgeted and available in the Folsom Plan Area Mangini Ranch Trails Project (PK2201) for the cost of construction management services.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Folsom that the City Manager is authorized to execute a Professional Services Agreement with Pinnacle Project Management , in a form acceptable to the City Attorney, for construction management services for the Folsom Plan Area Mangini Ranch Trails Project (PK2201) for a total not-to-exceed amount of $99,000.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

____________________________________
Sarah Aquino, MAYOR
ATTEST:

Page 262 ends

07/08/2025 Item No.15.

Resolution No. 11434

Page 2 of 2 ends

Christa Freemantle, CITY CLERK

Page 263 ends

07/08/2025 Item No.15.

Attachment 5

Page 264 ends

07/08/2025 Item No.15.

Page 265 ends

07/08/2025 Item No.15.

Page 266 ends

07/08/2025 Item No.15.

Page 267 ends

07/08/2025 Item No.15.

Page 268 ends

07/08/2025 Item No.15.

Page 269 ends

07/08/2025 Item No.15.

Page 270 ends

07/08/2025 Item No.15.

Page 271 ends

07/08/2025 Item No.15.

Page 272 ends

07/08/2025 Item No.15.

Page 273 ends

07/08/2025 Item No.15.

Page 274 ends

07/08/2025 Item No.15.

Page 275 ends

07/08/2025 Item No.15.

Page 276 ends

07/08/2025 Item No.15.

Page 277 ends

07/08/2025 Item No.15.

Page 278 ends

07/08/2025 Item No.15.

Page 279 ends

07/08/2025 Item No.15.

Page 280 ends

07/08/2025 Item No.15.

Page 281 ends

07/08/2025 Item No.15.

Page 282 ends

07/08/2025 Item No.15.

Page 283 ends

07/08/2025 Item No.15.

Page 284 ends

07/08/2025 Item No.15.

Page 285 ends

07/08/2025 Item No.15.

Page 286 ends

07/08/2025 Item No.15.

Page 287 ends

07/08/2025 Item No.15.

Page 288 ends

07/08/2025 Item No.15.

Page 289 ends

07/08/2025 Item No.15.

Page 290 ends

07/08/2025 Item No.15.

Page 291 ends

07/08/2025 Item No.15.

Attachment 6

Page 292 ends

07/08/2025 Item No.15.

Mangini Ranch Trails Project
City of Folsom
50 Natoma Street
Folsom, CA 95630
$2,900,000
Item
No. Item Qnty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 MOBILIZATION (10%) 1 LS $114,000 114,000.00 $290,000 290,000.00 $300,000 300,000.00 $83,000 83,000.00 $375,114 375,114.00 2 TRAFFIC CONTROL SYSTEM 1 LS $24,000 24,000.00 $100,000 100,000.00 $50,000 50,000.00 $200,000 200,000.00 $50,000 50,000.00 3 STORM WATER POLLUTION PREVENTION PLAN 1 LS $67,000 67,000.00 $30,000 30,000.00 $125,000 125,000.00 $100,000 100,000.00 $90,000 90,000.00 4 REMOVE CONCRETE (CURB AND GUTTER) 240 LF $34 8,160.00 $20 4,800.00 $25 6,000.00 $12 2,880.00 $10 2,400.00 5 REMOVE CONCRETE (SIDEWALK) 1450 SF $7 10,150.00 $10 14,500.00 $10 14,500.00 $6 8,700.00 $7.50 10,875.00 6 ROADWAY EXCAVATION (F) 3780 CY $57 215,460.00 $20 75,600.00 $125 472,500.00 $65 245,700.00 $155 585,900.00 7 CLEARING AND GRUBBING 1 LS $33,300 33,300.00 $100,000 100,000.00 $97,500 97,500.00 $62,000 62,000.00 $300,000 300,000.00 8 REMOVE THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS1 LS $6,850 6,850.00 $10,000 10,000.00 $7,800 7,800.00 $7,650 7,650.00 $7,300 7,300.00 9 MINOR CONCRETE (SIDEWALK) 6770 SF $29.00 196,330.00 $35.00 236,950.00 $14.00 94,780.00 $12.00 81,240.00 $28.00 189,560.00 10 MINOR CONCRETE (CURB & GUTTER) 200 LF $129.00 25,800.00 $55.00 11,000.00 $60.00 12,000.00 $140.00 28,000.00 $116.00 23,200.00 11 MINOR CONCRETE (COMMERCIAL DRIVEWAY TYPE A-6) 3 EA $16,260 48,780.00 $8,000 24,000.00 $11,500 34,500.00 $7,000 21,000.00 $18,200 54,600.00 12 DETECTABLE WARNING SURFACE 360 SF $70 25,200.00 $45 16,200.00 $35 12,600.00 $20 7,200.00 $69 24,840.00 13 AGGREGATE BASE (CLASS 2) 3400 CY $97 329,800.00 $55 187,000.00 $150 510,000.00 $126 428,400.00 $185 629,000.00 14 HOT MIX ASPHALT (TYPE B) 3170 TON $128 405,760.00 $185 586,450.00 $155 491,350.00 $154 488,180.00 $196 621,320.00 15 COLLAPSIBLE BOLLARD 16 EA $1,600 25,600.00 $4,500 72,000.00 $2,750 44,000.00 $2,178 34,848.00 $1,800 28,800.00 16 RELOCATE COLLAPSIBLE BOLLARD 2 EA $1,750 3,500.00 $2,000 4,000.00 $2,000 4,000.00 $1,150 2,300.00 $2,800 5,600.00 17 ROCK LINED DITCH 4530 LF $34 154,020.00 $25 113,250.00 $20 90,600.00 $11 49,830.00 $32 144,960.00 18 POST AND CABLE FENCE 160 LF $115 18,400.00 $120 19,200.00 $27 4,320.00 $26 4,160.00 $95 15,200.00 19 2' CMU BLOCK RETAINING WALL 80 LF $526 42,080.00 $200 16,000.00 $325 26,000.00 $355 28,400.00 $330 26,400.00 20 4' TALL BLACK METAL FENCE 430 LF $94 40,420.00 $90 38,700.00 $96 41,280.00 $95 40,850.00 $110 47,300.00 21 SIDEWALK BARRICADE 1 EA $1,000 1,000.00 $3,000 3,000.00 $1,140 1,140.00 $1,200 1,200.00 $1,100 1,100.00 22 PRECAST CONCRETE RAILROAD CROSSING PANELS 1 LS $69,000 69,000.00 $10,000 10,000.00 $30,000 30,000.00 $59,000 59,000.00 $12,900 12,900.00 23 ADJUST VALVE COVER TO GRADE 14 EA $1,850 25,900.00 $2,000 28,000.00 $500 7,000.00 $611 8,554.00 $975 13,650.00 24 TYPE F DRAIN INLET 2 EA $5,125 10,250.00 $3,500 7,000.00 $6,500 13,000.00 $5,000 10,000.00 $9,800 19,600.00 25 12" RCP DRAINAGE PIPE 50 LF $437 21,850.00 $650 32,500.00 $500 25,000.00 $315 15,750.00 $400 20,000.00 26 OUTFALL FLARED END SECTION 2 EA $1,500 3,000.00 $5,000 10,000.00 $2,250 4,500.00 $4,500 9,000.00 $3,800 7,600.00 27 8" SIDEWALK UNDERDRAIN 25 LF $680 17,000.00 $95 2,375.00 $500 12,500.00 $90 2,250.00 $200 5,000.00 28 THERMOPLASTIC TRAFFIC STRIPE - 4" YELLOW (BROKEN 9-3)12140 LF $2 24,280.00 $2.50 30,350.00 $2 24,280.00 $2 24,280.00 $2 24,280.00 29 THERMOPLASTIC TRAFFIC STRIPE - 4" YELLOW 370 LF $3 1,110.00 $3.50 1,295.00 $3 1,110.00 $3 1,110.00 $3 1,110.00 30 THERMOPLASTIC TRAFFIC STRIPE - 12" WHITE 720 LF $6.50 4,680.00 $9 6,480.00 $7 5,040.00 $7 5,040.00 $6.75 4,860.00 31 THERMOPLASTIC TRAFFIC STRIPE - 12" YELLOW 220 LF $6.50 1,430.00 $9 1,980.00 $7 1,540.00 $7 1,540.00 $6.75 1,485.00 32 THERMOPLASTIC PAVEMENT MARKING (WHITE) 420 SF $13 5,460.00 $16 6,720.00 $15 6,300.00 $14 5,880.00 $13.50 5,670.00 33 THERMOPLASTIC PAVEMENT MARKING (YELLOW) 160 SF $13 2,080.00 $16 2,560.00 $15 2,400.00 $14 2,240.00 $13.50 2,160.00 34 ROADSIDE SIGN 19 EA $527 10,013.00 $500 9,500.00 $600 11,400.00 $589 11,191.00 $600 11,400.00 35 INSTALL HAWK SIGNAL - SAVANNAH PKWY 1 LS $200,800 200,800.00 $250,000 250,000.00 $228,000 228,000.00 $224,518 224,518.00 $213,000 213,000.00 36 INSTALL SOLAR RRFB - SPARROW DR 1 LS $46,000 46,000.00 $55,000 55,000.00 $52,200 52,200.00 $51,221 51,221.00 $49,000 49,000.00 37 CONSTRUCTION SURVEYING & STAKING 1 LS $37,000 37,000.00 $35,000 35,000.00 $35,000 35,000.00 $32,200 32,200.00 $45,000 45,000.00 38 REMOVE POST AND CABLE RAILING 160 LF $19 3,040.00 $50 8,000.00 $20 3,200.00 $14 2,240.00 $39 6,240.00 39 REMOVE EXISTING LANDSCAPING 1 LS $5,500 5,500.00 $20,000 20,000.00 $25,000 25,000.00 $26,000 26,000.00 $6,500 6,500.00 40 CLEAR EXISTING CONCRETE SWALE 2170 LF $10.50 22,785.00 $15 32,550.00 $20 43,400.00 $3 6,510.00 $15 32,550.00 41 REPAIR AND REPLACE CONCRETE SWALE 440 LF $87.50 38,500.00 $45 19,800.00 $95 41,800.00 $150 66,000.00 $45 19,800.00 42 REMOVE AC DIKE 0 SF $0 0.00 $6,500 1,500.00 $420 0.00 $0 0.00 $5 0.00 43 RELOCATE EXISTING SIGN 5 EA $700 3,500.00 $500 2,500.00 $750 3,750.00 $413 2,065.00 $850 4,250.00 44 ADJUST PULLBOX TO GRADE 2 EA $1,800 3,600.00 $2,500 5,000.00 $750 1,500.00 $800 1,600.00 $1,500 3,000.00 45 CONCRETE COLLAR 20 EA $300 6,000.00 $110 2,200.00 $420 8,400.00 $300 6,000.00 $700 14,000.00 46 INSTALL 4" CONDUIT (SLEEVE) 790 LF $74 58,460.00 $120 94,800.00 $75 59,250.00 $26 20,540.00 $28 22,120.00 47 MINOR CONCRETE (MEDIAN PAVING) 100 SF $6,250 6,250.00 $60 6,000.00 $25 2,500.00 $65 6,500.00 $95 9,500.00 48 MINOR CONCRETE (MEDIAN CURB)(TYPE 5) 75 LF $125 9,375.00 $85 6,375.00 $40 3,000.00 $65 4,875.00 $130 9,750.00 49 REPLACE FAÇADE TILES 9 EA $1,400 12,600.00 $1,500 13,500.00 $750 6,750.00 $589 5,301.00 $130 1,170.00 50 UNDERCROSSING CONCRETE POLYESTER OVERLAY 2595 SF $103 267,285.00 $122 316,590.00 $131 339,945.00 $126 326,970.00 $105 272,475.00 51 UNDERCROSSING PAINTING AND ANTI-GRAFFITI COATING 6300 SF $7.50 47,250.00 $9 56,700.00 $15 94,500.00 $9.50 59,850.00 $11.10 69,930.00 52 UNDERCROSSING LIGHTING 1 LS $15,000 15,000.00 $30,000 30,000.00 $17,000 17,000.00 $16,800 16,800.00 $16,000 16,000.00 $2,774,608.00 $3,056,925.00 $3,549,135.00 $2,940,563.00 $4,157,469.00 Bid: $2,774,608.00 $3,056,925.00 $3,549,135.00 $2,940,563.00 $4,157,469.00 Check: CORRECT CORRECT CORRECT CORRECT CORRECT
Central Valley Engineering &
Asphalt, Inc

BASEB BID
Consolidated Engineering, Inc. JPB Design Inc. B&M Civil, LLCMangini Ranch Trails Project Total Base Bid
Dutch Contracting, Inc
Engineer's Estimate
6/23/2025 1 of 1

Page 293 ends

07/08/2025 Item No.15.

Attachment 7

Page 294 ends

07/08/2025 Item No.15.
kimley-horn.com 555 Capitol Mall, Suite 300, Sacramento, California 95814 916 858 5800 June 13, 2025
Mr. Brett Bollinger
Senior Trails Planner
City of Folsom Parks and Recreation Department
50 Natoma Street
Folsom, California 95630
Re: Mangini Ranch Trails – Amendment No. 3 – Design Support During Construction Scope of Services and Fee Proposal
Dear Brett:

This letter proposal was prepared based on our discussions with the City of Folsom (City) on June 12, 2025 requesting Kimley-Horn provide design support services during construction (DSDC). This letter constitutes a proposal setting forth our proposed amended Scope of Services and Fee. The City and Kimley-Horn entered into an agreement for design consulting services on September 10, 2021, the terms and conditions of which are incorporated herein by reference. Our Project Understanding, Scope of Services, Schedule, and Fee Proposal are as follows.

Project Understanding
Kimley-Horn understands the City intends to award the construction contract to the selected contractor at the July 8th City Council meeting, and the City is requesting continued design support during construction. We understand the City also has retained another firm to provide construction administration/management services. We anticipate the CA/CM firm will take the lead in reviewing and approving submittals and RFIs, and Kimley-Horn will provide support, as requested. We anticipate the construction duration will be up to seven (7) months.

Scope of Services
Task 1 – Design Support During Construction (DSDC)
Consultant will provide design support during construction, as requested, for the anticipated seven (7) month construction duration. Our scope includes the following construction support activities, that may be performed under the agreement, as requested by the City. Our proposed fee does not include enough budget for Kimley-Horn to perform all of the activities summarized below, and this list is intended to include the services we may provide during construction. Any services requested beyond the included budget will be considered additional services and can be performed for additional fee. · Prepare Conform Documents that will incorporate all modifications made to the design documents during the bidding phase.
· Attend one (1) pre-construction meeting, as requested by the City. We assume the meeting will be in-person and one (1) Consultant staff will attend, with one (1) additional Consultant staff attending online/by telephone.
· Visits to Site and Observation of Construction. Kimley-Horn will make site visits to observe the progress of the work, as requested by the City.

Page 295 ends

07/08/2025 Item No.15.

Brett Bollinger, June 13,2025
Mangini Ranch Trails – Amendment No. 3 – Design Support During Construction

Page 2 ends

· Kimley-Horn will not supervise, direct, or have control over Contractor's work, nor shall Kimley- Horn have authority to stop the Work or have responsibility for the means, methods, techniques, equipment choice and usage, schedules, or procedures of construction selected by Contractor, for safety programs incident to Contractor's work, or for any failure of Contractor to comply with any laws. Kimley-Horn does not guarantee the performance of any Contractor and has no responsibility for Contractor's failure to perform its work in accordance with the Contract Documents.
· Clarifications and Interpretations. Kimley-Horn will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents. Any orders authorizing variations from the Contract Documents will be made by Client.
· Shop Drawings and Samples. Kimley-Horn will review and approve or take other appropriate action in respect to Shop Drawings and Samples and other data which Contractor is required to submit, but only for conformance with the information given in the Contract Documents. Such review and approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs.
· Substantial Completion. Kimley-Horn will, promptly after notice from Contractor that it considers the entire Work ready for its intended use, in company with Client and Contractor, conduct a site visit to determine if the work of Contractor is substantially complete. Work will be considered substantially complete following satisfactory completion of all items with the exception of those identified on a final punch list. If after considering any objections of Client, Kimley-Horn considers the work of Contractor substantially complete, Kimley-Horn will notify Client and Contractor.
· Final Notice of Acceptability of the Work. If requested by the City, Kimley-Horn will conduct a final site visit to determine if the completed work of Contractor is generally in accordance with the contract documents and the final punch list so that Kimley-Horn may recommend, in writing, final payment to Contractor. Accompanying the recommendation for final payment, Kimley-Horn shall also provide a notice that the work of Contractor is generally in accordance with the contract documents to the best of Kimley-Horn’s knowledge, information, and belief based on the extent of its services and based upon information provided to Kimley-Horn upon which it is entitled to rely.
· Limitation of Responsibilities. Kimley-Horn will not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the work. Kimley-Horn will not have the authority or responsibility to stop the work of any Contractor.

This task assumes a maximum construction period of seven (7) months for DSDC. We assume a total

Page 296 ends

07/08/2025 Item No.15.

Brett Bollinger, June 13,2025
Mangini Ranch Trails – Amendment No. 3 – Design Support During Construction

Page 3 ends

of up to 80 hours of effort for this task. Design support during construction beyond the scope described herein will be considered an additional service.

Kimley-Horn assumes record drawings will be provided by the contractor to the City upon completion of construction. Therefore, record drawings are not included in this scope of services.

Schedule
Kimley-Horn will provide our services as noted in the Scope of Services as expeditiously as practicable to meet the mutually agreed upon schedule.

Fee and Billing
Kimley-Horn will provide the above Scope of Services on a labor fee plus expense basis. The scope will be performed for the additional not to exceed amount of $29,640.00. Labor fee will be billed according to our then-current rates. Direct reimbursable expenses such as express delivery services, fees, and other direct expenses will be billed at 1.10 times cost. An allocation charge of 5.0 percent will be added to the labor fee to cover certain other expenses as to these tasks such as telecommunications, in-house reproduction, postage, supplies, project related computer time, and local mileage. Administrative time related to the project may be billed hourly. All permitting, application, and similar project fees will be paid directly by the City.

We appreciate the opportunity to provide these services to you. Please contact Daniel at (916) 668-4951 if you have any questions or require additional information.

Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.

Daniel Carley, PE
Project Manager
PE No. C7630

Page 297 ends

07/08/2025 Item No.15.

Brett Bollinger, October 25, 2024
Mangini Ranch Trails – Amendment No. 2 – East Bidwell Street Crossing Feasibility Study

Page 4 ends
Page 298 ends

07/08/2025 Item No.15.

Attachment 8

Page 299 ends

07/08/2025 Item No.15.

Construction Management Assistance and Inspection Services Mangini Ranch Class I Trails- Project Scope and Fee
Exhibit A June 16, 2025

Page 1 of 2 ends

Scope Purpose
This scope is a response to the request from Brett Bollinger. The scope of this proposal is to provide construction management assistance to Brett where requested and to provide inspection services for the construction work being completed, which includes the following:

Tasks
Task 1 – Construction Management Assistance
• Attendance at all weekly construction and project coordination meetings • Review the Contractor’s baseline schedule and monthly updates and provide updates to the City upon request
• Review of bid documents
• Coordination with City Staff and legal counsel as required • Coordination and attendance at any required pre-bid meetings • Attendance at any public bid opening
• Review of bids
• Meetings with individual City Departments and outside agencies involved in the facilitation of the project
• Plan constructability review upon request by the City • Assistance in City standards and policy updates
• Review and routing of requested change orders
• Oversight of all site inspection and materials testing, which includes:
o Review of daily field reports
o Inspector weekly work schedule review and approval
o Response and routing of all RFIs
o Response and routing of all project material submittals o Traffic control plan review and routing
o Review of payment and invoicing for inspection companies • Design consultant coordination
• Dry utility construction coordination
• Conflict resolution
• Project tours as needed
• Project accountability focused on cost and time implications • Project closeout and acceptance

Page 300 ends

07/08/2025 Item No.15.

Construction Management Assistance and Inspection Services Mangini Ranch Class I Trails- Project Scope and Fee
Exhibit A June 16, 2025

Page 2 of 2 ends

Task 2 – Inspection Services
• Review project plans and specifications
• Document pre-construction conditions
• Monitor all construction activities for compliance with the contract plans and specifications • Document all observations in a daily inspection report complete with pertinent photographs • Inspection reports will be completed daily and uploaded to a secure cloud service that the City is provided with access to
• Collect and log all material tags into the project files • Traffic Control Monitoring
• Assess and provide material quantities and costs as requested by the City • Annotate final as-built drawings with any pertinent field changes • Attend standing and weekly construction meetings, as needed • Participate in final walk-through and prepare final field punch list Billings
Client will be billed monthly on a time and material basis per the attached project fee schedule and shall not exceed the estimated amount below. If the Client’s requested scope or duration of services exceeds the estimated amount below, Pinnacle will provide an updated scope and estimate to help alleviate the risk of a gap in service.
*Fee and Estimated Budget Amount
Task 1 Services
(Estimated 15hours/month) ................................ ............. T&M Estimated at $3,000/month Task 2 Services
(Estimated 40hours/month) ................................ ............. T&M Estimated at $8,000/month

Rate and Fee Schedule

Name Position Company Fixed Hourly Rate
Kelley Butcher City Representative Pinnacle $165
Jodi Snyder Document Control Manager Pinnacle $90
Isaak Butcher Document Control Tech Pinnacle $50
Site Inspector UNICO/Boswell $155Reg/$233OT/$311DOT

• No team members listed by name will be substituted without written authorization from the City. • Any purchases made at the specific direction of the City will be billed on a cost + 10% basis. • All listed rates are valid through 6.1.2025.

Page 301 ends

07/08/2025 Item No.15.

Attachment 9

Page 302 ends

07/08/2025 Item No.15.
1 Brett Bollinger
From: Nicholas Zwetsloot <[email protected]>
Sent: Tuesday, June 17, 2025 2:50 PM
To: Brett Bollinger; Saif Jarian
Cc: Tracey Bussick
Subject: Re: Formal Bid Protest – Mangini Ranch Class I Trails Project CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Dear Mr. Bollinger,
I am submitting this formal protest per Section 2.18 Bid Protests of the General Conditions of the contract regarding the apparent low bidder, Consolidated Engineering Inc. of Valley Springs, CA.

As outlined in Section 2.07, the City is required to award the project to the lowest responsive and responsible bidder who demonstrates the requisite experience, financial stability, facilities, and management capabilities to execute the project successfully and on schedule. Dutch Contracting Inc. maintains that Consolidated Engineering Inc. does not meet these critical criteria.

Based on our research, this project would be the largest undertaken by Consolidated Engineering Inc. to date. Their previous contract—Willow Creek Bridge (bid date: February 8, 2024) for Amador County—was awarded at just under $2 million. Reports indicate that the contractor is significantly behind schedule, struggling to meet contractual requirements, and facing liquidated damages of $6,300 per calendar day.

Additionally, at least one subcontractor has sought and been granted contract relief due to mismanagement. The project now risks extending into a third season due to delays before the next winter moratorium in October 2025. County of Amador: 209 223-6377 or email: [email protected] To protect taxpayer interests, we urge the City to exercise due diligence under Section 2.07 and require the three lowest bidders to submit statements of experience and business standing and or financial statements. If necessary, we request post-bid interviews to ensure the selected contractor has a proven track record of successfully completing projects of similar scale and complexity.

We appreciate your time and consideration of Dutch Contracting Inc. for the Mangini Ranch Class I Trails Project. Please feel free to reach out with any questions.

Page 303 ends

07/08/2025 Item No.15.
2 Nicholas Zwetsloot
Dutch Contracting Inc.

Phone: 916-436-5422
Mobile: 916-606-4825
Email: [email protected]
6930 26th Street
Rio Linda, Ca 95673
www.dutchcoinc.com

From: Brett Bollinger <[email protected]>
Sent: Tuesday, June 17, 2025 12:17 PM
To: Saif Jarian <[email protected]>
Cc: Nicholas Zwetsloot <[email protected]>
Subject: RE: Request for Bid Package – Mangini Ranch Class I Trails Project

See attached. Thanks.

Brett Bollinger
Senior Trails Planner
City of Folsom
50 Natoma Street, Folsom, CA 95630

Page 304 ends

07/08/2025 Item No.15.
3 [email protected]
o:916-461-6632
www.folsom.ca.us

From: Saif Jarian <[email protected]>
Sent: Tuesday, June 17, 2025 11:24 AM
To: Brett Bollinger <[email protected]>
Cc: Nicholas Zwetsloot <[email protected]>
Subject: Request for Bid Package – Mangini Ranch Class I Trails Project

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Dear Bollinger,

I am formally requesting a copy of the complete bid package submitted by Consolidated Engineering, Inc for the Mangini Ranch Class I Trails Project. Our firm was one of the participating bidders, and we would like to review the winning proposal for potential protest considerations.

Please provide the submitted bid documents from Consolidated Engineering, Inc including unit prices, subcontractor list, and all required forms or declarations.

We appreciate your prompt attention to this time-sensitive request.

Best regards,

Saif Jarian
Dutch Contracting Inc.

Construction Estimator
Phone: 916-436-5422
Mobile: 916-417-6291
Email: [email protected]
www.dutchcoinc.com
6930 26th Street
Rio Linda, CA. 95673

From: Saif Jarian <[email protected]>
Sent: Friday, June 13, 2025 11:23 AM
You don't often get email from [email protected]. Learn why this is important

Page 305 ends

07/08/2025 Item No.15.
4 To: [email protected] <[email protected]> Cc: Nicholas Zwetsloot <[email protected]>
Subject: Clarification of Bid Submission – Mangini Ranch Class I Trails Project

Dear Mr. Bollinger,
I hope this message finds you well.

I’m writing to clarify my bid submission for the Mangini Ranch Class I Trails Project. I inadvertently submitted a single combined total without separating the Base Bid and Additive Alternate No. 1 as outlined in the bid schedule.

For the City’s review, I would like to confirm that my Base Bid total is $2,940,563. I understand the City may elect to award only the Base Bid portion of the project, and I respectfully ask that this amount be considered in that context.

Additionally, if possible, I would appreciate it if you could share the official bid results for this project.

Thank you for your time and understanding. Please let me know if any additional information is needed.

Saif Jarian
Dutch Contracting Inc.

Construction Estimator
Phone: 916-436-5422
Mobile: 916-417-6291
Email: [email protected]
www.dutchcoinc.com
6930 26th Street
Rio Linda, CA. 95673

Page 306 ends

07/08/2025 Item No.15.

Attachment 10

Page 307 ends

07/08/2025 Item No.15.

Page 308 ends

07/08/2025 Item No.15.

Page 309 ends

07/08/2025 Item No.15.

Page 310 ends

07/08/2025 Item No.15.

Page 311 ends

07/08/2025 Item No.15.

Page 312 ends

07/08/2025 Item No.15.

Page 313 ends

07/08/2025 Item No.15.

Page 314 ends

07/08/2025 Item No.15.

Page 315 ends

07/08/2025 Item No.15.

Page 316 ends

07/08/2025 Item No.15.

Page 317 ends

07/08/2025 Item No.15.

Attachment 11

Page 318 ends

07/08/2025 Item No.15.

Page 319 ends

07/08/2025 Item No.15.

This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.

Page 320 ends

07/08/2025 Item No.15.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Public Hearing
SUBJECT: Resolution No. 11425 - A Resolution of the City Council of the City of Folsom Approving and Confirming the Report of
Delinquent Utilities Charges and Requesting Sacramento County to Collect Such Charges on the Tax Roll

FROM: Finance Department

RECOMMENDATION / CITY COUNCIL ACTION

Staff recommends, that the City Council review the attached Report of utilities delinquencies, hold a public hearing on the Report and accept any oral or written public comment, and adopt Resolution No. 11425- A Resolution of the City Council of the City of Folsom Approving and Confirming the Report of Delinquent Utilities Charges and Requesting Sacramento County to Collect such Charges on the Tax Roll.

BACKGROUND / ISSUE

The City provides various utilities services to properties throughout the City, including sewer, water, and solid waste services, for which the City charges a fee for service. While most accounts within the City are current, there are some delinquent utilities accounts. A Delinquent Utilities Charge Report (“Report”) specifying the delinquency by parcel number and type of property is attached showing delinquencies totaling $278,431.20.

Following notice and a public hearing, the City Council may pass a resolution, by at least a two-thirds vote, requesting that the County Auditor/Tax Collector transfer the City’s delinquent utilities charges to the property tax roll for collection with property taxes. Staff recommends the City Council consider the attached Report, hold a public hearing, and accept public comments on this matter, and authorize transfer of any delinquent utilities’ charges to the County for collection on the property tax roll.

Page 321 ends

07/08/2025 Item No.16.
2 Despite some delinquencies, the City has had remarkable success in utility collections. Utility billing collections average $59,800,000 annually. These collections include water, city sewer, and solid waste services, for a current total of 27,800 open municipal utility accounts. The delinquent amount of $278,431.20 is less than .5% of our annual collections.

POLICY / RULE

Folsom Municipal Code and state law provide that, following notice and a public hearing, the City Council may adopt a resolution transferring delinquent utilities charges to the County tax roll for collection with property taxes. (Cal. Gov’t Code 25831, 38790.1; Cal. Health and Safety Code §§ 5470 et seq.; Folsom Municipal Code Chapters 3.20 (collection of municipal service charges generally) 13.12 (collection of sewer charges). The resolution authorizing the transfer must be passed by the City Council by a two-thirds vote. (Cal. Health & Safety Code § 5473).

ANALYSIS

The City provides sewer, water, and solid waste services to properties within the City, for which it charges the users. While the vast majority of accounts throughout the City are current, there are some accounts that are more than 60 days delinquent in payment and appropriate for transfer to the County tax roll for collection. The total amount of these eligible delinquent accounts is $278,431.20 as indicated on the attached Report. The Report captures accounts that were noticed with a delinquent amount of $100 or greater. The last time a request was made to transfer delinquent utilities to the tax roll was July of 2024.

State law authorizes the City Council, by resolution adopted by at least a two-thirds vote, to request that the County Auditor/Tax Collector transfer these delinquent amounts to the property tax roll for collection with general property taxes. Prior notice of the hearing is to be mailed to the property owners not less than ten days before the hearing. (Cal. Gov’t Code §§ 38790.1, 25831). Notice is also to be published in a newspaper of general circulation for two consecutive weeks prior to the hearing. (Cal. Health & Safety Code § 5473.1; Cal. Gov’t Code § 6066). City staff has satisfied these notice requirements by mailing notice to affected property owners on June 4, 2025. A public hearing notice was published in the Folsom Telegraph on June 20, 2025, and June 27, 2025.

Following a public hearing, the City Council has discretion to adopt the Report as presented, modify the Report, or decline to adopt the Report. However, if the City Council finds that valid protests are made by the owners of a majority of separate parcels of property described in the Report, the Council may not adopt the Report and may not transfer the delinquencies to the tax roll. (Cal. Health & Safety Code § 5473.2). Upon passage of the resolution confirming the Report of delinquencies, as presented, or modified, the Revenue Division will transmit the Report to the Auditor/Tax Collector for placement of the charges on the tax rolls

Page 322 ends

07/08/2025 Item No.16.
3 for collection with property taxes. County staff has advised City staff that in order to have the matters placed on the tax roll for this year, the Report must be transmitted to the County no later than August 4, 2025.

FINANCIAL IMPACT

The City currently has $278,431.20 in delinquent charges that are appropriate for transfer to the tax rolls. Approving this item and authorizing the transfer will help toward collection of these amounts. Should the County accept these amounts, the City will receive payment directly from the County for these amounts and the County will pursue collection through the tax rolls.

ENVIRONMENTAL REVIEW

This action does not constitute a “project” under the California Environmental Quality Act (“CEQA”) and does not require environmental review.

ATTACHMENT

1. Resolution No. 11425 - A Resolution of the City Council of the City of Folsom Approving and Confirming the Report of Delinquent Utilities Charges and Requesting Sacramento County to Collect such Charges on the Tax Roll

Submitted,

Stacey Tamagni, CPA
Director of Finance

Page 323 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 1 of 9 ends

RESOLUTION NO. 11425

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FOLSOM

APPROVING AND CONFIRMING THE REPORT OF DELINQUENT UTILITIES

CHARGES AND REQUESTING SACRAMENTO COUNTY

TO COLLECT SUCH CHARGES ON THE TAX ROLL

WHEREAS, the City of Folsom (the “City”) provides certain solid waste, water, and sewer services to its residents and occupants; and

WHEREAS, Government Code sections 25831 and 38790.1, California Health and Safety Code sections 5473 et seq. and Chapters 3.20 and 13.12 of the Folsom Municipal Code authorize the City to have the delinquent charges for the above services (the “Charges”) collected on the tax roll by Sacramento County on the relevant parcels; and

WHEREAS, City staff has prepared a Delinquent Utilities Charges Report (the “Report”) identifying the delinquent charges by Assessor’s Parcel Number; and

WHEREAS, a hearing was held on July 8, 2025, at which the City Council reviewed and considered the Report and any protests related thereto, with prior notice of the hearing being provided as required by law;

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Folsom:

1. Findings. In reviewing and considering the delinquent Charges and the Report, the City Council hereby makes the following findings:

a. Notice of the public hearing before the City Council was published in a newspaper of general circulation at least once a week for two consecutive weeks prior to the City Council public hearing, and notice was mailed at least ten (10) days prior to the hearing to each affected property owners at addresses as shown on the latest equalized assessment roll or as known to the City; and,

b. Notice of the public hearing before the City Council included the date, time, and place of the public hearing, the identity of the hearing body, and a general explanation of the matter to be considered; and,

c. Upon considering all objections and protests received at the time of the hearing on this matter, the City Council finds that protest by owners of a majority of the parcels of property described in the Report does not exist.

2. Confirming the Report. The City Council hereby approves, confirms, and adopts the Report, as directed and attached hereto and incorporated herein by reference, and determines that the Charges are proper and correct. The City Council directs the Finance Director to make any amendments to the Report as were directed by the City Council and as necessary to remove

Page 324 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 2 of 9 ends

parcels from the Report for which payment has been made before transfer of the amounts to Sacramento County for collection on the tax roll, subject to the same penalties, procedure, and sale in case of delinquency as provided for those taxes.

3. Authorization. The City Council hereby authorizes and directs the Finance Director to deliver a certified copy of the finalized Report to the Sacramento County Department of Finance - Auditor Division and to submit a certified copy of this Resolution and Report to the County Recorder for recordation.

4. Services of Sacramento County. The Offices of the Sacramento County Department of Finance - Auditor Division is requested for the placement of the Charges on the Annual Secured property tax roll with the Ad Valorem taxes.

5. General Authorization. The City Manager, City Finance Director, City Clerk, City Attorney and the other officers and agents of the City are hereby authorized and directed, individually and collectively, to do any and all things and to execute, deliver, and perform any and all agreements and documents that they deem necessary or advisable in order to effectuate the purposes of this Resolution. All actions heretofore taken by the officers and agents of the City that are in conformity with the purposes and intent of this Resolution are hereby ratified, confirmed, and approved in all respects.

6. Effective Date. This resolution shall take effect immediately upon its passage.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll call vote:

AYES: Councilmember(s)

NOES: Councilmember(s)

ABSENT: Councilmember(s)

ABSTAIN: Councilmember(s)

______________________________
Sarah Aquino, MAYOR

ATTEST:

Christa Freemantle, CITY CLERK

Page 325 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 3 of 9 ends

City of Folsom Delinquent Utilities Charge Report
as of 7/8/2025

APN AMOUNT
072-0031-016-0000 $6,788.40
072-3070-003-0000 $6,280.52
072-0840-045-0000 $5,746.21
071-0031-006-0000 $4,589.87
070-0166-009-0000 $3,619.18
072-2660-036-0000 $2,846.03
213-0550-005-0000 $2,747.43
072-3810-054-0000 $2,642.13
227-0520-007-0000 $2,321.36
071-0660-060-0000 $2,226.19
072-0940-079-0000 $2,214.22
072-2010-038-0000 $2,122.20
072-3530-018-0000 $2,080.08
072-1730-005-0000 $2,045.05
072-0780-044-0000 $2,044.71
072-3530-034-0000 $2,030.25
227-0230-003-0000 $2,023.05
071-0720-015-0000 $2,019.66
071-0470-006-0000 $2,000.98
072-0890-031-0000 $2,000.71
072-2450-004-0000 $2,000.58
071-1700-066-0000 $1,995.60
072-1370-024-0000 $1,976.92
072-1810-001-0000 $1,972.29
070-0146-003-0000 $1,953.59
072-0780-037-0000 $1,953.03
072-1390-050-0000 $1,946.73
072-1040-054-0000 $1,926.59
071-0700-047-0000 $1,914.49
071-0093-005-0000 $1,898.60
072-3790-008-0000 $1,892.28
072-3810-094-0000 $1,883.63
071-0600-014-0000 $1,879.47
072-3710-025-0000 $1,876.02
072-1380-045-0000 $1,873.12
072-0700-007-0000 $1,862.54
072-3870-070-0000 $1,836.15
072-2250-003-0000 $1,825.10

Page 326 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 4 of 9 ends

071-1460-017-0000 $1,805.74
072-1250-089-0000 $1,787.31
071-1870-060-0000 $1,787.08
072-0940-021-0000 $1,783.91
072-3660-071-0000 $1,782.61
072-3850-005-0000 $1,773.12
071-0460-020-0000 $1,769.65
072-3170-036-0000 $1,763.80
071-0172-011-0000 $1,763.12
072-1530-017-0000 $1,762.76
072-1760-003-0000 $1,758.26
072-1000-025-0000 $1,757.55
070-0193-004-0000 $1,752.02
071-0231-003-0000 $1,740.54
072-3700-050-0000 $1,734.38
071-1440-069-0000 $1,732.29
070-0116-022-0000 $1,719.02
072-3280-024-0000 $1,699.53
071-0214-007-0000 $1,694.98
071-0101-005-0000 $1,694.80
072-1160-082-0000 $1,690.15
072-1740-024-0000 $1,683.81
072-1560-013-0000 $1,681.97
071-1030-027-0000 $1,666.55
227-0520-002-0000 $1,650.67
072-3170-019-0000 $1,648.47
072-0870-028-0000 $1,647.63
213-0283-027-0000 $1,645.62
072-2030-058-0000 $1,625.99
072-3780-025-0000 $1,624.62
213-0071-032-0000 $1,621.89
071-0083-002-0000 $1,617.83
072-1140-021-0000 $1,607.29
071-1110-032-0000 $1,599.72
071-0950-053-0000 $1,585.72
071-0480-009-0000 $1,573.47
072-0940-046-0000 $1,573.23
072-2450-021-0000 $1,572.60
071-1650-009-0000 $1,570.56
071-1840-008-0009 $1,562.26
071-1880-038-0000 $1,548.85
213-0590-016-0000 $1,534.23
071-0243-042-0000 $1,527.36

Page 327 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 5 of 9 ends

070-0210-028-0000 $1,518.73
071-1840-007-0003 $1,510.02
227-0420-006-0000 $1,478.89
227-0480-056-0000 $1,478.67
071-1300-046-0000 $1,476.71
071-1820-018-0000 $1,433.02
072-3660-084-0000 $1,426.98
227-0320-035-0000 $1,426.42
072-1070-093-0000 $1,422.99
072-1580-003-0000 $1,417.92
072-2780-068-0002 $1,408.66
071-0020-103-0000 $1,389.08
072-3770-024-0000 $1,388.79
072-0760-022-0000 $1,383.50
072-1130-059-0000 $1,368.38
070-0120-002-0000 $1,366.86
227-0600-009-0000 $1,352.89
213-0820-023-0000 $1,352.81
227-0550-012-0000 $1,352.24
071-1440-019-0000 $1,340.00
071-0410-013-0000 $1,328.92
072-0700-035-0000 $1,326.36
071-0073-020-0000 $1,308.06
072-1290-007-0000 $1,298.32
071-0290-029-0000 $1,277.84
071-0800-034-0000 $1,254.72
072-3600-032-0000 $1,248.57
071-1810-049-0037 $1,243.31
071-2060-013-0000 $1,226.60
071-0073-023-0000 $1,211.28
071-0590-022-0000 $1,205.51
072-2710-020-0000 $1,183.09
071-2020-053-0000 $1,176.31
072-3490-008-0000 $1,167.30
072-1880-013-0000 $1,151.45
072-3790-009-0000 $1,134.78
071-0790-060-0000 $1,087.51
227-0330-026-0000 $1,066.53
071-1870-014-0000 $1,055.40
071-1980-024-0000 $1,054.42
071-1270-032-0000 $1,036.19
072-1090-005-0000 $1,021.54
071-0470-044-0000 $993.22

Page 328 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 6 of 9 ends

072-3170-034-0000 $987.40
227-0230-035-0000 $963.67
072-3570-006-0000 $915.83
072-3470-036-0000 $900.41
072-2830-007-0036 $881.41
070-0153-002-0000 $849.56
071-1440-103-0000 $849.34
072-2510-015-0000 $838.72
071-1590-040-0000 $827.88
213-0760-032-0000 $777.50
071-1840-006-0009 $771.05
072-4060-046-0000 $762.90
072-2030-035-0000 $752.58
072-1450-048-0000 $740.31
071-1840-008-0043 $732.36
072-0940-019-0000 $696.24
072-2030-037-0000 $688.12
213-0900-017-0000 $680.94
071-1520-076-0000 $665.96
071-0212-003-0000 $664.96
071-0173-002-0000 $660.39
072-1770-050-0000 $654.59
213-0710-010-0000 $643.66
072-4060-088-0000 $642.52
072-1290-012-0000 $636.03
071-0780-018-0000 $633.44
072-4130-072-0000 $629.81
072-1060-032-0000 $620.12
072-3660-040-0000 $612.80
213-0580-013-0000 $601.31
072-2830-004-0023 $596.76
072-3850-065-0000 $592.59
070-0182-002-0000 $590.38
071-0154-001-0000 $579.94
227-0490-030-0000 $568.34
072-2660-023-0000 $567.37
227-0460-014-0000 $557.71
072-1780-005-0000 $552.42
072-4020-039-0000 $548.71
072-1760-011-0000 $543.73
071-0590-004-0000 $519.72
072-3590-008-0000 $519.58
072-0860-042-0000 $517.72

Page 329 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 7 of 9 ends

072-3580-023-0000 $513.41
072-3700-014-0000 $509.52
072-3470-082-0000 $505.67
071-1740-038-0000 $500.48
072-0740-013-0000 $498.27
072-3470-042-0000 $492.89
071-1510-046-0000 $491.52
072-3860-115-0000 $466.00
071-0300-053-0000 $454.76
072-3630-015-0000 $451.45
072-0940-098-0000 $450.95
071-1170-067-0000 $448.33
071-1500-041-0000 $446.51
071-1200-033-0000 $435.45
227-0330-037-0000 $423.02
072-1620-052-0000 $420.67
072-1100-031-0000 $418.92
072-2040-023-0000 $405.73
072-3270-034-0000 $402.21
072-2690-032-0000 $379.36
227-0570-004-0000 $372.72
072-3820-002-0000 $363.60
071-0340-017-0000 $356.39
072-1500-010-0000 $353.78
072-2490-011-0000 $349.39
071-0143-018-0000 $345.83
070-0182-002-0000 $343.42
072-3760-071-0000 $343.38
072-3760-022-0000 $338.14
072-2410-037-0000 $334.19
072-1550-057-0000 $331.75
071-2020-034-0000 $328.93
072-1250-061-0000 $327.71
072-4000-032-0000 $321.94
070-0101-016-0000 $312.40
072-4190-075-0000 $311.71
071-0072-002-0000 $310.49
071-1680-016-0000 $310.41
072-3860-059-0000 $309.66
071-0460-037-0000 $309.34
070-0154-014-0000 $308.47
071-1980-020-0000 $307.68
072-2660-034-0000 $276.91

Page 330 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 8 of 9 ends

071-0630-029-0000 $273.38
213-0760-027-0000 $270.86
072-2770-022-0000 $264.44
227-0390-041-0000 $261.36
227-0600-021-0000 $261.36
072-2650-086-0000 $254.17
072-1580-012-0000 $250.47
071-1290-042-0000 $250.33
227-0390-066-0000 $247.86
072-1300-011-0000 $246.38
071-0780-033-0000 $231.29
071-1810-031-0010 $227.62
071-1680-044-0000 $227.35
072-3470-091-0000 $225.48
071-0212-004-0000 $217.64
071-0300-024-0000 $215.96
071-0650-061-0000 $209.42
070-0111-014-0000 $206.37
072-1890-009-0000 $200.00
072-0870-018-0000 $194.22
071-0280-037-0000 $184.94
071-0690-042-0000 $180.35
072-2140-013-0000 $179.76
072-0720-058-0000 $178.12
072-1920-008-0000 $174.33
072-2060-015-0000 $171.97
072-4170-049-0000 $171.06
072-3760-006-0000 $167.44
072-3860-090-0000 $167.19
071-2080-034-0000 $167.14
072-1640-005-0000 $166.64
072-1160-006-0000 $164.84
071-0510-011-0000 $164.59
072-1150-057-0000 $164.55
071-0470-010-0000 $164.19
072-1600-009-0000 $163.54
072-3650-044-0000 $163.10
072-3660-011-0000 $162.87
072-2660-046-0000 $162.66
072-3850-051-0000 $162.66
072-0930-050-0000 $160.06
071-0640-008-0000 $159.68
071-1870-003-0000 $159.50

Page 331 ends

07/08/2025 Item No.16.

Resolution No. 11425

Page 9 of 9 ends

072-2030-057-0000 $153.43
071-1920-031-0000 $153.08
072-2690-045-0000 $151.69
071-1950-060-0000 $150.83
071-1170-064-0000 $148.55
071-1170-106-0000 $138.22
213-0910-022-0000 $138.18
072-0950-067-0000 $127.30
227-0580-032-0000 $123.93

Page 332 ends

07/08/2025 Item No.16.

Folsom City Council
Staff Report

1 MEETING DATE:

7/8/2025
AGENDA SECTION:

Public Hearing
SUBJECT: Resolution No. 11431 - A Resolution Approving the Final Engineer’s Report, Confirming the Diagrams and Assessments, and Ordering the Continued Levying of Assessments for Maintenance and Servicing of Improvements Within the City of Folsom Landscaping and Lighting Districts for Fiscal Year 2025 -2026 for American River Canyon North, American River Canyon North No. 2, American River Canyon North No. 3, Blue Ravine Oaks, Blue Ravine Oaks No. 2, Briggs Ranch, Broadstone, Broadstone No. 4, Broadstone Unit No. 3, Cobble Ridge, Cobble Hills Ridge II/Reflections II, Folsom Heights, Folsom Heights No. 2, Hannaford Cross, Lake Natoma Shores, Los Cerros, Natoma Station, Natoma Valley, Prairie Oaks Ranch, Prairie Oaks Ranch No. 2, Prospect Ridge, Sierra Estates, Silverbrook, Steeplechase, The Residences at American River Canyon, The Residences at American River Canyon II, Willow Creek Estates East, Willow Creek Estates East No. 2, Willow Creek Estates South, and Willow Springs

FROM: Parks and Recreation Department

RECOMMENDATION / CITY COUNCIL ACTION

Staff recommends the City Council adopt Resolution No. 11431 - A Resolution Approving the Final Engineer’s Report, Confirming the Diagrams and Assessments, and Ordering the Continued Levying of Assessments for Maintenance and Servicing of Improvements Within the City of Folsom Landscaping and Lighting Districts for Fiscal Year 2025-2026 for American River Canyon North, American River Canyon North No. 2, American River Canyon North No. 3, Blue Ravine Oaks, Blue Ravine Oaks No. 2, Briggs Ranch, Broadstone, Broadstone No. 4, Broadstone Unit No. 3, Cobble Ridge, Cobble Hills Ridge II/Reflections II, Folsom Heights, Folsom Heights No. 2, Hannaford Cross, Lake Natoma Shores, Los Cerros, Natoma Station, Natoma Valley, Prairie Oaks Ranch, Prairie Oaks Ranch No. 2, Prospect Ridge, Sierra Estates, Silverbrook, Steeplechase, The Residences at American River Canyon, The Residences at American River Canyon II, Willow

Page 333 ends

07/08/2025 Item No.17.
2 Creek Estates East, Willow Creek Estates East No. 2, Willow Creek Estates South, and Willow Springs.

BACKGROUND / ISSUE

On June 10, 2025, the City Council adopted Resolution No. 11399 - A Resolution Approving the Preliminary Engineer's Report for the Following Landscaping and Lighting Districts for Fiscal Year 2025-2026 and Setting Public Hearing for American River Canyon North, American River Canyon North No. 2, American River Canyon North No. 3, Blue Ravine Oaks, Blue Ravine Oaks No. 2, Briggs Ranch, Broadstone, Broadstone No. 4, Broadstone Unit No. 3, Cobble Ridge, Cobble Hills Ridge Il/Reflections II, Folsom Heights, Folsom Heights No. 2, Hannaford Cross, Lake Natoma Shores, Los Cerros, Natoma Station, Natoma Valley, Prairie Oaks Ranch, Prairie Oaks Ranch No. 2, Prospect Ridge, Siena Estates, Silverbrook, Steeplechase, The Residences at American River Canyon, The Residences at American River Canyon II, Willow Creek Estates East, Willow Creek Estates East No. 2, Willow Creek Estates South, and Willow Springs. The Engineer’s Report for the City of Folsom Landscaping and Lighting (L&L) Districts addresses the annual assessment for each of the city’s 30 existing Landscaping and Lighting Districts.

As was the case in Fiscal Year 2024-25, Natoma Station-Union Square L&L will not be assessed for Fiscal Year 2025-26 since the Homeowners’ Association has elected to cover maintenance costs at this time.

At the June 10, 2025 , City Council meeting, City Council directed the Engineer of Record to include a table within the Final Engineers Report to reflect revenues and expenses to further highlight operational deficits as well as th e total District account balance as of April 30, 2025.

Annual operational deficits are funded from the Landscape and Lighting Districts pooled cash account. Any reserve fund balance deficits are assigned to the specific district and is the ongoing financial responsibility of the district. Operating deficits can be reduced by annual reserve fund collections or a reduction in services provided to the district. The chart referenced below can be found on pages 44 and 45 in the June 2025 Final Engineers Report for Fiscal Year 2025-26.

Page 334 ends

07/08/2025 Item No.17.
3 Revenue and Expense Table

POLICY / RULE

Pursuant to Streets and Highways Code Section 22586, an annual Engineer’s Report shall be filed with the City Clerk. The City Council is also required to adopt a resolution confirming the diagram and assessment pursuant to Section 22631 of the Streets and Highway Code.

Pursuant to Streets and Highways Code Section 22656, if there is a surplus or a deficit in the improvement fund of an assessment district at the end of any fiscal year, the surplus or deficit shall be carried forward to the next annual assessment to be levied within such district and applied as a credit or a debit, as the case may be, against such assessment.

Page 335 ends

07/08/2025 Item No.17.
4 ANALYSIS

The Preliminary Engineer’s Report approved by Resolution No. 11399 described the maintenance and servicing to be performed in the city’s 30 Landscaping and Lighting Districts for Fiscal Year 2025-26. The establishment of annual assessments for each of the L&L Districts requires a resolution confirming the diagram and assessment. The Engineer’s Report is in compliance with the Landscaping and Lighting Act of 1972; including but not limited to Sections 22565 et seq (preparing a report that complies with the article); and Sections 22660 and 22662 (regarding annual installments procedures/process).

Assessment to Properties

This year’s assessments to properties have been broken into three categories and are depicted in the provided table below. Districts that are showing an increase in assessments this year are districts that were formed with provisions for CPI (consumer price index) otherwise known as an escalator, or cost of living increase. Many of these districts are newer districts or overlay districts that either still do not have an adequate fund balance or need additional assessments to achieve a balanced budget. The next category is static or no increase. These are the districts that do not have provisions for CPI’s or have CPI’s but do not need to utilize them currently to achieve a balanced budget. The last category is decrease; these are districts that have an adequate fund balance and do not need to levy the full assessment to achieve a balanced budget. There was also one (1) district being removed from the tax roll, Union Square, because it has an HOA that manages their landscape areas.

Page 336 ends

07/08/2025 Item No.17.
5 Installment Summary
The installment summaries describe short-term installments collected pursuant to Section 22660 of the Streets and Highways Code to meet the districts’ future repair and replacement needs anticipated to occur within an approximate five-year time frame, as well as long-term installments collected to meet those future needs anticipated to occur within 5 to 30-year time frames.

Comparison to Last Year
District budgets for this upcoming year will continue focusing on improvements and restorations that enhance e ach district’s commitment to water conservation, prolonging assets life, drought tolerant landscaping improvements, fire safety, and tree stewardship. As such, some districts will be retrofitting and centralizing irrigation controllers, inventorying street trees, changing out plant materials to water wise varietals, and converting over to LED streetlights. Many of the City’s

Page 337 ends

07/08/2025 Item No.17.
6 districts are over 20 years old and do not have escalators built into their rates to track with cost-of- living increases and economic changes. As such, districts being monitored for future outreach regarding a new assessment overlay district are Briggs Ranch (36 years old), Hannaford Cross (34 years old), Cobble Ridge II / Reflections II (31 years old), Broadstone (33 years old) & Broadstone No.4. Broadstone No.4 was approved by voters and adopted by the City Council in July 2016. The budget for Broadstone No. 4 was structured to provide for immediate needs in the first five years by way of a higher assessment, then reduced to a lower as sessment for maintenance in the following years. This second (reduced) level of assessment is inadequate to address the long-term maintenance and renovation needs of the district. Lastly, the city will continue outreach for an increase in Natoma Station in the 2025-26 Fiscal Year.

Steeplechase, Blue Ravine Oaks & Blue Ravine Oaks No.2 (The Shores), Willow Creek Estates East & Willow Creek Estates East No.2, Willow Creek Estates South (Lexington Hills), Los Cerros, Lake Natoma Shores (The Preserves), Willo w Springs, and Sierra Estates have been identified as having projected budget revenue shortfalls that may impact their ability to maintain basic landscape and lighting services within the next five years. To ensure continued service levels and fiscal sustainability, these districts will require outreach efforts and consideration of new or increased property assessments in accordance with Proposition 218 procedures.

FINANCIAL IMPACT

Each Landscaping and Lighting District levies and collects funds to cover operating and maintenance costs attributed to district assets. One (1) district is being removed from the tax roll (Union Square because it has an HOA that manages the landscape areas).

Pursuant to Streets and Highways Code Section 22662 (b) as reflected in the Revenue and Expense Table, there are eight districts with a negative fund balance as of April 30, 2025. Staff is requesting the Council provide for a temporary advance to the improvement funds of these districts from the Landscape and Lighting Districts pooled cash account to fund the operational deficit and the negative fund balance, which will enable staff to continue to provide the minimum level of service pending prop 218 proceedings. These advanced funds shall be directed to be paid back at 0% interest over the next 15 fiscal years, commencing in FY 2026-27 and concluding in FY 2040-41. Staff shall include amortization tables for each district to accompany the FY 2026-27 engineers report.

ENVIRONMENTAL REVIEW

This action is exempt from environmental review under the California Environmental Quality Act (CEQA).

ATTACHMENTS

1. Resolution No. 11431 - A Resolution Approving the Final Engineer’s Report, Confirming the Diagrams and Assessments, and Ordering the Continued Levying of Assessments for Maintenance and Servicing of Improvements Within the City of Folsom Landscaping and Lighting Districts for Fiscal Year 2025 -26 for American River Canyon North, American River Canyon North No. 2, American River Canyon North No. 3, Blue Ravine Oaks, Blue Ravine Oaks No. 2, Briggs Ranch, Broadstone, Broadstone No. 4, Broadstone Unit No. 3,

Page 338 ends

07/08/2025 Item No.17.
7 Cobble Ridge, Cobble Hills Ridge II/Reflections II, Folsom Heights, Folsom Heights No. 2, Hannaford Cross, Lake Natoma Shores, Los Cerros, Natoma Station, Natoma Valley, Prairie Oaks Ranch, Prairie Oaks Ranch No. 2, Prospect Ridge, Sierra Estates, Silverbrook, Steeplechase, The Residences at American River Canyon, The Residences at American River Canyon II, Willow Creek Estates East, Willow Creek Estates East No. 2, Willo w Creek Estates South, and Willow Springs

2. Final Engineer’s Report – The City of Folsom Landscaping and Lighting Districts, June 2025

Submitted,

Kelly Gonzalez, Parks & Recreation Director

Page 339 ends

07/08/2025 Item No.17.

Attachment 1

Page 340 ends

07/08/2025 Item No.17.

Resolution No. 11431

Page 1 of 5 ends

RESOLUTION NO. 11431
A RESOLUTION APPROVING THE FINAL ENGINEER’S REPORT,

CONFIRMING THE DIAGRAMS AND ASSESSMENTS, AND ORDERING THE

CONTINUED LEVYING OF ASSESSMENTS MAINTENANCE AND SERVICING OF

IMPROVEMENTS WITHIN THE CITY OF FOLSOM LANDSCAPING AND LIGHTING DISTRICTS FOR FISCAL YEAR 2025-2026 FOR AMERICAN RIVER CANYON NORTH, AMERICAN RIVER CANYON NORTH NO. 2, AMERICAN RIVER CANYON NORTH NO. 3, BLUE RAVINE OAKS, BLUE RAVINE OAKS NO. 2, BRIGGS RANCH, BROADSTONE, BROADSTONE NO. 4, BROADSTONE UNIT NO. 3,

COBBLE RIDGE, COBBLE HILLS RIDGE II/REFLECTIONS II, FOLSOM HEIGHTS, FOLSOM HEIGHTS NO. 2, HANNAFORD CROSS, LAKE NATOMA SHORES, LOS

CERROS, NATOMA STATION, NATOMA VALLEY, PRAIRIE OAKS RANCH, PRAIRIE OAKS RANCH NO. 2, PROSPECT RIDGE, SIERRA ESTATES,

SILVERBROOK, STEEPLECHASE, THE RESIDENCES AT AMERICAN RIVER

CANYON, THE RESIDENCES AT AMERICAN RIVER CANYON II, WILLOW CREEK ESTATES EAST, WILLOW CREEK ESTATES EAST NO. 2, WILLOW

CREEK ESTATES SOUTH, AND WILLOW SPRINGS

WHEREAS, On June 10, 2025, the City Council adopted Resolution No. 11399- A Resolution Approving the Preliminary Engineer’s Report for the Following Landscaping and Lighting Districts for Fiscal Year 2025-2026 and Setting Public Hearing for American River Canyon North, American River Canyon North No. 2, American River Canyon North No. 3, Blue Ravine Oaks, Blue Ravine Oaks No. 2, Briggs Ranch, Broadstone, Broadstone No. 4, Broadstone Unit No. 3, Cobble Ridge, Cobble Hills Ridge II/Reflections II, Folsom Heights, Folsom Heights No. 2, Hannaford Cross, Lake Natoma Shores, Los Cerros, Natoma Station, Natoma Valley, Prairie Oaks Ranch, Prairie Oaks Ranch No. 2, Prospect Ridge, Sierra Estates, Silverbrook, Steeplechase, The Residences at American River Canyon, The Residences at American River Canyon II, Willow Creek Estates East, Willow Creek Estates East No. 2, Willow Creek Estates South, and Willow Springs; and

WHEREAS, July 8, 2025, at 6:30 p.m. is the day and time set for hearing objections to the levying of said assessments as identified in Exhibit A attached to this resolution; and

WHEREAS, the Final Engineer’s Report for the Assessment Districts has been made, filed with the City Clerk and considered by the City Council and is deemed sufficient and approved. The Final Engineer’s Report shall stand as the Engineer’s Report for all subsequent proceedings under and pursuant to this resolution, Section 22500, et. seq., of the California Streets and Highways Code and Article XIIID of the California Constitution.

Page 341 ends

07/08/2025 Item No.17.

Resolution No. 11431

Page 2 of 5 ends

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF FOLSOM DOES HEREBY RESOLVE AS FOLLOWS: The City Council finds that the Final Engineer’s Report for the Landscaping and Lighting Districts in full compliance with the Landscaping and Lighting Act of 1972 and, based on said Report, adopt and approve the following actions:

1. Approve as submitted, the Final Engineer’s Report filed with this City Clerk for the City of Folsom Landscaping and Lighting Districts for Fiscal Year 2025-26.

2. Confirm and approve the diagrams and assessments as set forth in the City of Folsom Landscaping and Lighting Districts Final Engineer’s Report for Fiscal Year 2025-26

3. Continue to order the levy of assessments as set forth in the City of Folsom Landscaping and Lighting Districts Final Engineer’s Report for Fiscal Year 2025-26.

4. Order the maintenance and servicing of improvements as set forth in the City of Folsom Landscaping and Lighting Districts Final Engineer’s Report for Fiscal Year 2025-26.

5. Ratify all prior temporary advances from the Landscape and Lighting Districts pooled cash account to the Landscaping and Lighting Districts that had insufficient assessments to pay for the c osts of improvements , maintenance, and services for the benefit of those Districts.

6. Direct t he temporary advance of funds from the Landscape and Lighting Districts pooled cash account to those eight districts with negative account balances to provide for the continued service levels, and direct staff to provide an amortization table to accompany the FY 2026-27 engineers report for repayment of debt at 0% interest over a 15-year period concluding in FY 2040-41.

7. Request that the Auditor of S acramento County enter on the Sacramento County Assessment Roll the assessment for each lot or parcel of land in the amount indicated in the Final Engineer’s Report.

PASSED AND ADOPTED this 8th day of July 2025, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

___________________________________
Sarah Aquino, MAYOR

Page 342 ends

07/08/2025 Item No.17.

Resolution No. 11431

Page 3 of 5 ends

ATTEST:

____________________________________
Christa Freemantle, CITY CLERK

Page 343 ends

07/08/2025 Item No.17.

Resolution No. 11431

Page 4 of 5 ends

Exhibit A

OF RESOLUTION No. 11431

CITY OF FOLSOM

LANDSCAPING AND LIGHTING DISTRICTS
FISCAL YEAR 2025-2026

Page 344 ends

07/08/2025 Item No.17.

Resolution No. 11431

Page 5 of 5 ends
Page 345 ends

07/08/2025 Item No.17.

Attachment 2

Page 346 ends

07/08/2025 Item No.17.

nbsgov.com
Prepared by:

Corporate Headquarters
32605 Temecula Parkway, Suite 100
Temecula, CA 92592
Toll free: 800.676.7516

Final Engineer’s Report For: Fiscal Year 2025/26
Landscape and Lighting Assessment Districts
June 202 5

Page 347 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report

TABLE OF CONTENTS

1. Engineer’s Letter .................................................................................... ......................... 1

2. Introduction ...................................... ................................................... .......................... 2

2.1 Background .................................... ............................................................................ 2

2.2 Process for Annual Assessment ................. ............................................................... 2

2.3 Legislative Context ........................... ......................................................................... 3

3. Plans and Specifications ............................................................................. ..................... 6

3.1 Description of Improvements ................... ................................................................ 7

4. Estimate of Costs and Budgets ........................................................................ .............. 20

5. Method of Apportionment............................ ................................................... ............. 21

5.1 Discussion of Benefit ......................... ...................................................................... 21

5.2 General versus Special Benefit ................ ................................................................ 23

5.3 Quantification of General Benefit ............. .............................................................. 24

5.4 Method of Apportionment ....................... ............................................................... 25

5.5 Assessment Apportionment ...................... .............................................................. 25

5.6 Maximum Assessment Increase ................... ........................................................... 39

5.7 Fiscal Year 2025/26 Maximum Assessment ........ .................................................... 39

6. Assessment Diagram ................................................................................... .................. 41

7. Budgets .............................................................................................. .......................... 42

8. Assessment Rolls ..................................................................................... ..................... 46

Page 348 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 1

1. ENGINEER’S LETTER
WHEREAS, the City Council of the City of Folsom (the “City”), State of California, under the Landscaping and Lighting Act of 1972 (the “Act”), directed NBS to prepare and file an Engineer’s Report for the City of Folsom Landscaping and Lighting Districts for Fiscal Year 2025/26, in accordance with Article 4 of Chapter 1 of the Act and Article XIII D of the California Constitution. The report presents the plans and specifications describing the general nature, location and extent of the improvements to be maintained, an estimate of the costs of the administration, maintenance, operations and servicing of the improvements for Fiscal Year 2025/26, the diagram for the Districts, showing the area and properties to be assessed, and assessing the net amount upon the assessable lots and/or parcels within the Districts in proportion to the special benefit received. NOW THEREFORE, the assessments as detailed in this Engineer’s Report and as summarized in the table below are made to cover the portion of the estimated costs of maintenance, operation and servicing of said improvements to be paid by the assessable real property within the Districts in proportion to the special benefit received. (1) Total amount levied may differ slightly due to installment rounding. (2) A list of Districts, the total proposed Fiscal Year 2025/26 assessments, the number of parcels assessed, and assessment rates are detailed in Section 8 of this Engineer’s Report. I, the undersigned, respectfully submit this Engineer’s Report and, to the best of my knowledge, information and belief, the Engineer’s Report, Assessments, and the Assessment Diagram herein have been prepared, computed and levied in accordance with the assessment methodology adopted, approved and ordered by the City Council of the City of Folsom at the time of each District formation.

Summary Cost Estimate Description Total Costs(1) Improvement Costs $2,593,876.00 Incidental Costs 564,692.06 Total Improvement Costs $3,158,568.06 Reserve Fund Collection / (Contribution) ($672,534.87) Total Balance to Assess(2) $2,486,033.19 _______________________________ John G. Egan, P. E. Assessment Engineer

Page 349 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 2

2. INTRODUCTION

2.1 Background
The City has previously formed 30 Landscaping and Lighting Districts (the “Districts”) to provide funding for the installation, maintenance and servicing of landscaping, sidewalks, fences, walls, parks, open space, signage, soundwalls, street lighting, and other public improvements in the City. The 30 Districts are as follows:
 American River Canyon North  Los Cerros
 American River Canyon North No. 2  Natoma Station
 American River Canyon North No. 3  Natoma Valley
 Blue Ravine Oaks  Prairie Oaks Ranch
 Blue Ravine Oaks No. 2  Prairie Oaks Ranch No. 2
 Briggs Ranch  Prospect Ridge
 Broadstone  Sierra Estates
 Broadstone No.3  Silverbrook
 Broadstone No. 4  Steeplechase
 Cobble Hills Ridge II/Reflections II  The Residences at American River Canyon  Cobble Ridge  The Residences at American River Canyon II  Folsom Heights  Willow Creek Estates East
 Folsom Heights No. 2  Willow Creek Estates East No. 2  Hannaford Cross  Willow Creek Estates South
 Lake Natoma Shores  Willow Springs

2.2 Process for Annual Assessment
The Districts were formed and assessments were established in previous fiscal years. As required by the procedures specified in the Act, an Engineer’s Report must be prepared on an annual basis which contains a full and detailed description of the improvements, the boundaries of the assessment district and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the assessment district. The Engineer’s Report may also identify future planned projects.

The City Council must also annually adopt a resolution of intention which:
 Declares the intention of the City Council to levy and collect assessments within the assessment district for the fiscal year stated therein.
 Generally describes the existing and proposed improvements and any substantial changes proposed to be made in existing improvements.

Page 350 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 3  Refers to the assessment district by its distinctive designation and indicates the general location of the assessment district.
 Refers to the report of the engineer, on file with the City Clerk, for a full and detailed description of the improvements, the boundaries of the assessment district and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the assessment district.  Gives notice of the time and place for public hearing by the City Council on the levy of the proposed assessment.
 States whether the assessment is proposed to increase from the previous year.

If the assessments are to be levied in the same or lesser amounts than the maximum assessment allowed, the City Clerk shall give notice of the public hearing by causing the resolution of intention to be published at least 10 days prior to the date of the public hearing. Any interested person may, prior to the conclusion of the public hearing, file a written protest which shall state all grounds of objection. The protest shall contain a description sufficient to identify the property owned by the property owner filing the protest.

During the course or upon conclusion of the hearing, the City Council may order changes in any of the matters provided in the report, including changes in the improvements, any zones within the assessment district, and the proposed diagram or the proposed assessment. If the assessment to be levied exceeds the maximum assessment allowed, the City must comply with the procedures specified in Article XIII D and Proposition 218.

The City Council, upon conclusion of the public hearing must then adopt a resolution confirming the diagram and assessment, either as originally proposed or as changed by it. The adoption of the resolution shall constitute the levy of an assessment for the fiscal year referred to in the assessment. If confirmed, the assessments would be submitted to the County Auditor Controller for inclusion on the property tax roll.

2.3 Legislative Context
In 1996, California voters adopted Proposition 218, known as the “Right to Vote on Taxes Act,” which added Articles XIII C and XIII D to the California Constitution. Article XIII D established new substantive and procedural requirements on agencies for levying assessments, being levies on real property by an agency for a special benefit conferred upon the real property. “Special benefit” is defined in Article XIII D as “a particular and distinct benefit over and above general benefits conferred on a real property located in the district or to the public at large.”
Article XIII D imposes five basic substantive requirements on assessments:
 All parcels that will have a special benefit conferred upon them and upon which an assessment will be imposed must be identified;
 The general benefits must be distinguished from the special benefits conferred on the parcels;  The proportionate special benefit derived by each identified parcel must be determined in relationship to the entirety of the capital cost of a public improvement, the maintenance and operation expenses of a public improvement, or the cost of the property related service being provided;

Page 351 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 4  The amount assessed to a parcel must not exceed the reasonable cost of the proportional special benefit conferred on that parcel and must not include any costs attributable to the general benefit; and
 Parcels within a district that are owned or used by any agency, the State of California or the United States shall not be exempt from assessment unless the agency can demonstrate by clear and convincing evidence that those publicly owned parcels in fact receive no special benefit.

Since the initial passage of Proposition 218, several court rulings have helped provide context and direction with respect to the procedures and requirements of Article XIII D for levying assessments. Several of the key concepts from these rulings are summarized below.

GENERAL BENEFIT
Article XIII D requires an agency to separate the general benefits from the special benefits conferred on the identified parcels because only special benefits are assessable.

The Court of Appeal in Golden Hills Neighborhood Assn., Inc. v. City of San Diego (2011) (“ Golden Hills” ) clarified this concept by stating, “ Separation and quantification of general and special benefits must be accomplished by apportioning the cost of a service or improvement between the two and assessing property owners only for the portion of the cost representing special benefits .” The Court of Appeal in Beutz v. County of Riverside (2010) (“ Beutz” ) noted that the trial court took judicial notice of the Legislative Analyst’s Office pamphlet titled “Understanding Proposition 218” which states an agency must, “ estimate the amount of special benefit landowners would receive from the project or service, as well as the amount of ‘general benefit.’ This step is needed because Proposition 218 allows local government to recoup from assessments only the proportionate share of cost to provide the special benefit. ”
The Court in Beutz furthered this idea stating, “ Separating the general from the special benefits of a public improvement project and estimating the quantity of each in relation to the other is essential if an assessment is to be limited to the special benefits.”
The Court of Appeal in Silicon Valley Taxpayers' Association Incorporated v. Santa Clara County Open Space Authority (2008) (“SVTA”) clarified that general benefits are not restricted to benefits conferred only on persons and property outside the assessment district but can include benefits both conferred on real property located in the district or to the public at large. The “public at large” includes all members of the public, including those who live, work, and shop within the district, and not simply transient visitors.

The Court of Appeal again reiterated the need to separate, quantify and apportion costs to general benefits from the improvements in Broad Beach Geologic Hazard Abatement District v 31506 Victoria Point LLC (2022), stating, “The District cites no authority, and we are aware of none, suggesting that an agency’s subjective intent determines the need to account for general benefits.”

BENEFIT-BASED NOT COST-BASED
In Town of Tiburon v. Bonander (2009) (“ Tiburon” ), the Court of Appeal clarified the idea that assessments must be apportioned based upon benefit rather than cost. The Court stated, “ Proportionate special benefit is the basis upon which a project’s total assessable costs are apportioned among parcels within an assessment district. ”

Page 352 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 5 The assessment on a particular property cannot be based on the relative cost of the improvements to the property, but rather on the special benefit conferred on such property. The Court in Tiburon also stated, “an assessment represents the entirety of the cost of the improvement or property-related service, less any amount attributable to general benefits (which may not be assessed), allocated to individual properties in proportion to the relative special benefit conferred on the property .”

MEASURING AND APPORTIONING SPECIAL BENEFIT
The Court in Tiburon acknowledged the difficulty of trying to precisely assign and measure special benefit, stating, “ Any attempt to classify special benefits conferred on particular properties and to assign relative weights to those benefits will necessarily involve some degree of imprecision. ” The Court in Tiburon went on to say that a formula assigning equal weight to different special benefits “may be a legally justifiable approach to measuring and apportioning special benefits, [but] it is not necessarily the only valid approach. Whichever approach is taken to measuring and apportioning special benefits, however, it must be both defensible and consistently applied .”

Page 353 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 6

3. PLANS AND SPECIFICATIONS
The work and improvements proposed to be undertaken by the City and the cost thereof paid from the continuation of the annual assessment provide special benefit to parcels within the Districts as defined in the Method of Apportionment herein. Consistent with the Act, the Districts’ work and improvements are generally described as follows:

The installation, maintenance and servicing of turf, ground cover, shrubs and trees, irrigation systems, drainage systems, street lighting, fencing, soundwalls, sidewalks, monuments, statuary, fountains, water quality ponds, park facilities, open space, bike trails, walkways, drainage swales, other ornamental structures and facilities, entry signage, street pavers, art work, and monuments, as well as all necessary appurtenances, labor, materials, supplies, utilities, and equipment, as applicable, for property owned or maintained by the City. Any plans and specifications for these improvements have been filed with the City and are incorporated herein by reference.
"Maintain" or "maintenance" means the furnishing of services and materials for the ordinary and usual maintenance, operation, and servicing of any improvement, including:
a) Repair, removal, or replacement of all or any part of any improvement. b) Providing for the life, growth, health, and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, or treating for disease or injury. c) The removal of trimmings, rubbish, debris, and other solid waste. d) The cleaning, sandblasting, and painting of walls and other improvements to remove or cover graffiti.
"Service" or "servicing" means the furnishing of:
a) Electric current or energy, gas, or other illuminating agent for any public lighting facilities or for the lighting or operation of any other improvements.
b) Water for the irrigation of any landscaping, the operation of any fountains, or the maintenance of any other improvements.

Plans and Specifications for the improvements are incorporated by reference and made a part of this Engineer’s Report. The Plans and Specifications for each District are on file with the City and are available for public inspection.

Included is a separate but integral tool: the City of Folsom Landscaping and Lighting District Improvement Plan (“Improvement Plan”). It is a separate planning document that identifies the type of upcoming improvements (e.g. re-landscaping a corridor or painting a wall); the estimated cost; any installments required for short-term (less than five years) and/or long term (not greater than 30 years) improvements, and the approximate schedule for completion of the improvements. The City intends to continually update and revise the Improvement Plan throughout each year to reflect the current status of improvement projects, budget updates and/or changes in priorities.

Page 354 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 7 The concept of the Improvement Plan arose from the City’s commitment to comply with the requirements of the Act as well as produce a valuable instrument that enables the City to schedule, prioritize, and plan for needed maintenance and servicing improvements in the districts. It also serves as a user-friendly means for members of the public to review and understand the use of the assessment revenues generated from each District.

The assessment proceeds from each District will be exclusively used for improvements within that District plus incidental expenses. Reference is made to Section 4 - Estimate of Costs and Budgets, Section 7 – Budgets, and the additional plans and specifications, including District specific expenditure and improvement plans, which are on file with the City.

3.1 Description of Improvements
The following are descriptions of the improvements for each of the Districts.

AMERICAN RIVER CANYON NORTH
 Maintenance of lawns and trees within landscape medians, corridors, and open spaces.  Purchase of irrigation water from San Juan Suburban Water District.  Maintenance of irrigation system, entry fountain, plantings, sidewalks and streetlights.  Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Waterfall pumps, autofill, filters, and chlorination system.  Waterfall pond liner (concrete and other).
 Major monuments on Oak Avenue at American River Canyon Drive.

AMERICAN RIVER CANYON NORTH NO. 2
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Paint and replace streetlight poles.

AMERICAN RIVER CANYON NORTH NO. 3
 Purchase of electric power.
 Purchase of irrigation water from San Juan Suburban Water District.  Maintenance of landscaping, open space, lighting, signs, sidewalk and walls, waterfalls, including turf, ground cover, shrubs and trees, irrigation systems, drainage systems, street lighting, walls, and signs.

Page 355 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 8 Planned Improvement Projects for Fiscal Year 2025/26:
 West Side of American River Canyon Drive turf replacement.

Future Improvement Projects:
 Centralized irrigation controller upgrade.
 Signage replacement.
 Tree pruning.
 Ladder fuel removal.
 Waterfall rock repair.
 Baldwin Dam path repair.
 Tree and landscape improvements or replacements.
 American River Canyon Drive/Canyon Falls (Cascade perimeter) landscaping, remove/replace trees, mow band replacement.
 Main Walking Trail landscaping, irrigation, stairs, and clean up.  Minor monument replacements (six monuments).
 Trail bollard replacements (29 bollards).
 Irrigation controller replacements (16 controllers).
 Interior trail repairs.

BLUE RAVINE OAKS AND BLUE RAVINE OAKS NO. 2
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from City.
 Maintenance of irrigation system, plantings, sidewalks, fences, walls, and streetlights.  Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Mini park turf and shrub renovations.
 Tree pruning.
 Blue Ravine Road wall repair.
 Irrigation controller replacements (three controllers).  Streetlight pole replacements (six poles).
 Tree removal and replacement.
 Riley Street fence replacement.
 Signage replacement.
 Turf renovation Timson Drive and Riley Street.

Page 356 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 9  Turf renovation Hazelmere Drive and Riley Street.
 Turf renovation between Hazelmere Drive and Timson Drive.

BRIGGS RANCH
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from City.
 Maintenance of irrigation system, plantings, sidewalks, trails, walls, fences, open space area, signage, and streetlights.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Shrub and tree upgrades (Blue Ravine Road/East Natoma Street).  Fence/wall repair/replacement.
 Fence repair/replacement (East Natoma Street partial).  Trail repairs.
 Pet stations repair/replacement.
 Tree pruning.
 Bollard repair/replacement.
 Fence repair/replacement (Blue Ravine Road partial).
 Entry sign replacement (brass lettering).
 Irrigation upgrades/replacement (three controllers).
 Landscape lighting upgrades or replacement.
 Tree and landscape improvements (partial collection).  Irrigation controller replacements (two controllers).  Trail bollard replacements (11 bollards).
 Streetlight pole replacements (six poles).
 Monument repair.

BROADSTONE AND BROADSTONE NO. 4
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from the City.
 Maintenance of irrigation system, plantings, sidewalks, trails, sound walls, water quality ponds, and streetlights.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Page 357 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 10 Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree and landscape improvements (partial fund collection).  Bollard repair/painting/replacement (27 bollards).
 Light pole/fixture replacement of KW.
 Trail repairs.
 Repair irrigation, replace shrubs (Iron Point Road median, Rathbone Circle, Knopfler Circle, and other interior areas).
 Tree and landscape improvements or replacements.
 Ladder fuel removal.
 Shrub replacement throughout (some irrigation repair) 28 acres.  Landscape light repair/replacement (60 lights).
 Pet station replacement (seven stations).
 Signage repair/replacement.
 Turf removal/irrigation retrofit.
 Irrigation upgrades and flow (15 controllers).
 Fence replacement at retention areas.
 Streetlight pole replacements (25 poles).
 Redwood removals adjacent to soundwall (400+)
 Post and cable replacement.

BROADSTONE NO. 3
 Purchase of electric power.
 Maintenance of street light fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Paint streetlight poles (350 poles).
 Streetlight pole replacements (12 poles).

COBBLE HILLS RIDGE II/ REFLECTIONS II
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from the City.
 Maintenance of irrigation system, plantings, sidewalks, soundwalls, signage, parks, park facilities, open space, and streetlights.
 Purchase of electric power from Sacramento Municipal Utility District.

Page 358 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 11  Maintenance of public lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree and landscape improvements or replacement.
 Turf and shrub repair/replacement (Mini Park and path to Lembi Drive).  Tree pruning.
 Fence repair/replacement (225 feet).
 Wall repairs and painting (628 feet).
 Shrub replacement (Glenn Drive/Oxburough Drive and Sibly Street and Corner).  Signage repair/replacement.
 Irrigation controller replacements (five controllers).  Streetlight pole replacements (three poles).

COBBLE RIDGE
 Purchase of irrigation water from the City.
 Maintenance of the irrigation system and plantings in a useful and workable condition, together with maintaining walls, and open space areas.
 Maintenance of lawns and trees within landscape corridors.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Fence repair/replacement.
 Shrub replacement.
 Tubular fence replacement.
 Tree and landscape improvements or replacement.
 Irrigation controller replacement.
 Streetlight pole replacements (three poles).

FOLSOM HEIGHTS AND FOLSOM HEIGHTS NO. 2
 Maintenance of lawns and trees within landscape medians and corridors, corridors, bike trails, walkways, and open space areas.
 Purchase of irrigation water from the City.
 Maintenance of irrigation system, plantings, fences, walls, sidewalks, and streetlights.  Purchase of electric power.
 Maintenance of street lighting fixtures.

Page 359 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 12 Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Ladder fuel removal.
 Tree pruning and tree care in open space.
 Fence work.
 Glenn Drive wall repair.
 Tree and landscape improvements (Vierra Circle).
 Landscape replacement (Glenn Drive).
 Signage replacement.
 Irrigation controller replacements (four controllers).  Streetlight pole replacements (three poles).

HANNAFORD CROSS
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water and electric power for the two mini parks in a 70%/30% (City/District) contribution (based on maintenance assignments).
 Maintenance of irrigation system, bike trails, walkways, fences, walls, guard shack, drainage swale, plantings, sidewalks, and streetlights.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Lakeside fence repair.
 Repairs at guard shack.
 Tree pruning.
 Streetlight pole replacements (three poles).
 Plant replacement on Lakeside Way and Inwood Road.
 Wall repairs on Inwood Road.
 Plant Replacement on Egloff Circle.
 Guard shack roof repair.
 Irrigation controller replacements (three controllers).

Page 360 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 13

LAKE NATOMA SHORES
 Maintenance of lawns and trees within landscape medians and corridors.  Maintenance of irrigation system, soundwalls, signage, street pavers, plantings, sidewalks, and streetlights.
 Purchase of irrigation water from the City.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 LED landscape lights.
 Tree pruning.
 Signage repair/replacement.
 Turf repair and irrigation upgrades.
 Tree and landscape improvements or replacement.
 Irrigation controller replacements (two controllers).  Streetlight pole replacements (two poles).

LOS CERROS
 Maintenance of landscape medians and corridors.
 Purchase of irrigation water from the City.
 Maintenance of irrigation system, walls, plantings, sidewalks, and streetlights.  Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree replacement.
 Tree pruning
 Landscape LED replacements.
 Ladder fuel removal.
 Upgrade irrigation controllers.
 Install flow package and master valve.
 Streetlight pole replacements (three poles).
 Streetlight pole painting.

Page 361 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 14

NATOMA STATION
 Maintenance of irrigation system, walls, signage, artwork, open space areas, parks, plantings, and streetlights.
 Purchase of irrigation water from the City.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Light pole replacement.
 Shrub and tree replacement / concrete work on turnpike.  Iron Point Road shrub and tree replacement.
 Bigfoot mini park tree replacement.
 Tree replacement / wall damage on Black Diamond Drive.  Shrub and tree replacement on Blue Ravine Road.
 Tree pruning.
 Ladder fuel removal.
 Tree and landscape improvements or replacements.
 Wetland area improvements.
 Wall repair and painting (7,800 linear feet).
 Mini park replanting / bark (two parks @ 0.5 acre).
 Road paver replacement.
 Signage repair / replacement.
 Sidewalk repair.
 Irrigation upgrades.
 Art repair.
 Redwood removals and tree replacements adjacent to wall (50+).  Streetlight pole replacement / painting.

Union Square: A Benefit Zone within Natoma Station will be providing its own landscaping and lighting maintenance via an existing homeowner’s association for Fiscal Year 2025/26.

NATOMA VALLEY
 Installation, maintenance and servicing of turf, ground cover, shrubs and trees, irrigation systems, drainage systems, street lighting, soundwalls, retaining walls, fencing and all necessary appurtenances, labor, materials, supplies, utilities, and equipment.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Page 362 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 15 Future Improvement Projects:
 Tree pruning.
 Wall repair/replacement.
 Landscape replacement on Upper Tier and Lower Tier.
 Irrigation controller replacement.
 Streetlight pole replacement.

PRAIRIE OAKS RANCH AND PRAIRIE OAKS RANCH NO. 2
 Maintenance and servicing of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from the City.
 Maintenance of irrigation system, walls, signage, fences, open space areas, trellises, and streetlights along Grover Road, Russi Road, Willard Drive, Stewart Street, and the interior public roadways within the subdivisions.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 Landscape replacement on corners of Blue Ravine Road and Russi Road.

Future Improvement Projects:
 Tree pruning.
 Tree and landscape replacement.
 Fence replacement.
 LED landscape lights.
 Repair damaged walls (stucco half walls).
 Landscape replacement on Blue Ravine Road.
 Landscape Replacement on Riley Street.
 Landscape Replacement on Prairie City Road.
 Landscape replacement on Iron Point Road.
 Post and cable replacement.
 Irrigation controller replacements (10 controllers).
 Streetlight pole replacements (six poles).

PROSPECT RIDGE
 Maintenance of irrigation system, walls, signage, open space areas, parks, plantings, and streetlights.
 Purchase of irrigation water from the City.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Page 363 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 16  Maintenance of landscape corridors.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Ladder fuel removal.
 Drainage cleanup.
 Wall replacement.
 Plant replacement.
 Irrigation controller replacement.
 Streetlight pole replacement.

SIERRA ESTATES
 Maintenance of landscaping, lighting and soundwalls along Rowland Court, Dolan Court and Riley Street including turf, ground cover, shrubs and trees, irrigation systems, drainage systems, street lighting, fencing, soundwalls, monuments, statuary, fountains, and other ornamental structures and facilities, entry monuments, and all necessary appurtenances.  Purchase of water from the City.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Wall replacement (partial).
 Landscape replacement on frontage.
 Irrigation controller replacement.
 Streetlight pole replacement.

SILVERBROOK
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from the City.
 Maintenance of irrigation system, plantings, sidewalks, and streetlights.  Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Page 364 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 17 Future Improvement Projects:
 Tree replacement.
 Median relandscaping.
 Irrigation controller replacement.
 Streetlight pole replacements (two poles).

STEEPLECHASE
 Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from the City.
 Maintenance of irrigation system, plantings, sidewalks, and streetlights.  Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Park turf renovation.
 Park plant replacement.
 Landscape frontage replacement.
 Trail repairs.
 Trail bollard replacement.
 Irrigation controller replacements (two controllers).  Streetlight pole replacements (20 poles).

THE RESIDENCES AT AMERICAN RIVER CANYON
 Maintenance landscaping, lighting and soundwalls along American River Canyon Drive and Oak Avenue including turf, ground cover, shrubs and trees, irrigation systems, drainage systems, street lighting, sound-walls, and all necessary appurtenances.  Purchase of water from San Juan Water District.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Landscape replacement.
 Tree replacement.

Page 365 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 18  Drainage cleanup.
 Wall replacement partial.
 Irrigation controller replacement.
 Streetlight pole replacement.

THE RESIDENCES AT AMERICAN CANYON II
 Installation, maintenance and servicing of turf, ground cover, shrubs, and trees, irrigation systems, drainage systems, street lighting, walls, signage and all necessary appurtenances, and labor, materials, supplies, utilities, and equipment
Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Landscape replacement.
 Tree replacement.
 Drainage cleanup.
 Wall replacement partial.
 Irrigation controller replacement.
 Streetlight pole replacement.

WILLOW CREEK ESTATES EAST AND WILLOW CREEK ESTATES EAST NO. 2  Maintenance of lawns and trees within landscape medians and corridors.  Purchase of irrigation water from the City.
 Maintenance of irrigation system, walls, plantings, sidewalks and streetlights, as well as weed abatement.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Two flow packages and master valve installation.
 Light pole replacement (three poles).
 Tree pruning.
 Landscape replacement on Oak Avenue.
 Landscape replacement on Blue Ravine Road.
 Irrigation controller upgrade (four controllers).
 Tree and landscape improvement or replacement.

Page 366 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 19  Streetlight pole replacements (35 poles).

WILLOW CREEK ESTATES SOUTH
 Purchase of irrigation water from the City.
 Maintenance of Irrigation system, walls, entry signage, drainage way, parks, sidewalks and streetlights, as well as weed abatement.
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Tree pruning.
 Wall repair on Oak Avenue.
 Tree removal/replacement.
 Silberhorn Drive landscape renovation.
 Turf renovation on Scholar Way.
 Oak Avenue relandscape.
 Irrigation controller replacements (10 controllers).
 Streetlight pole replacements (six poles).

WILLOW SPRINGS
 Purchase of electric power.
 Maintenance of street lighting fixtures.

Planned Improvement Projects for Fiscal Year 2025/26:
 No planned improvement projects.

Future Improvement Projects:
 Streetlight pole replacements (four poles).

Page 367 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 20

4. ESTIMATE OF COSTS AND BUDGETS
The Fiscal Year 2025/26 estimated costs of maintenance and servicing the improvements as described in the Plans and Specifications of this Engineer’s Report are summarized below. Refer to Section 7 - Budgets, for detailed budgets for each District.

District
Improvement
Costs
Current Year
Projects
Incidental
Costs
Total
Improvement
Costs
American River Canyon North $70,000.00 $0.00 $6,523.54 $76,523.54 American River Canyon North No. 2 4,500.00 0.00 4,962.76 9,462.76 American River Canyon North No. 3 208,060.00 160,000.00 37,406.32 405,466.32 Blue Ravine Oaks 26,200.00 0.00 1,620.05 27,820.05
Blue Ravine Oaks No. 2 22,380.00 0.00 14,276.78 36,656.78 Briggs Ranch 103,443.00 0.00 102,877.37 206,320.37
Broadstone 441,000.00 0.00 136,040.63 577,040.63
Broadstone No. 3 22,500.00 0.00 8,558.65 31,058.65
Broadstone No. 4 149,405.00 0.00 9,093.03 158,498.03 Cobble Hills II/Reflections II 48,669.00 0.00 13,573.66 62,242.66 Cobble Ridge 18,987.00 0.00 3,378.21 22,365.21
Folsom Heights 14,800.00 0.00 1,554.56 16,354.56
Folsom Heights No. 2 68,352.00 0.00 11,941.49 80,293.49 Hannaford Cross 27,187.00 0.00 8,033.09 35,220.09
Lake Natoma Shores 28,588.00 0.00 9,259.56 37,847.56 Los Cerros 53,742.00 0.00 10,032.43 63,774.43
Natoma Station 219,844.00 0.00 54,738.43 274,582.43
Natoma Valley 57,307.00 0.00 2,887.86 60,194.86
Prairie Oaks Ranch 133,000.00 0.00 3,552.06 136,552.06 Prairie Oaks Ranch No. 2 128,026.00 151,000.00 40,365.15 319,391.15 Prospect Ridge 27,445.00 0.00 3,119.60 30,564.60
The Residences at American River Canyon 23,656.00 0.00 1,961.36 25,617.36 The Residences at American River Canyon II 23,656.0 0 0.00 1,957.37 25,613.37 Sierra Estates 11,948.00 0.00 1,901.29 13,849.29
Silverbrook 9,606.00 0.00 1,737.06 11,343.06
Steeplechase 27,001.00 0.00 7,390.12 34,391.12
Willow Creek Estates East 24,000.00 0.00 2,088.79 26,088.79 Willow Creek Estates East No. 2 81,331.00 0.00 22,997.32 104,328.32 Willow Creek Estates South 196,443.00 0.00 36,166.34 232,609.34 Willow Springs 11,800.00 0.00 4,697.18 16,497.18
Total Improvement Costs $2,282,876.00 $311,000.00 $564,692.06 $3,158,568.06

Page 368 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 21

5. METHOD OF APPORTIONMENT
The following section of the Engineer's Report includes an explanation of the benefits to be derived from the installation, maintenance and servicing of the improvements throughout the Districts, as well as a description of the assessment methodology used to apportion the total assessment to properties within each District.

The Districts consist of all assessor parcels within the boundaries as defined by the Assessment Diagram included with this report. Further, all assessor parcels, including all privately and publicly owned parcels, are identified by Assessor Parcel Numbers listed within the included assessment levy roll. The method used for apportioning the assessment is based on the proportional special benefits to be derived by the properties in the Districts over and above general benefits conferred on real property or to the public at large.

The apportionment of special benefit is a two-step process: the first step is to identify the types of special benefit arising from the improvements, and the second step is to allocate the assessments to property based on the estimated relative special benefit for each type of property.

Historical annual Engineer’s Reports were prepared by a different engineer of record and specific language from those historical Engineer’s Reports have been referenced to describe the Method of Apportionment within the following section of this report.

5.1 Discussion of Benefit
Assessments can only be levied based on the special benefit to property. This benefit is received by property over and above any general benefits. With reference to the requirements for assessments, Section 22573 of the Act states:
"The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be recei ved by each such lot or parcel from the improvements."
Proposition 218, as codified in Article XIII D of the California Constitution, has confirmed that assessments must be based on the special benefit to property and the assessment must not exceed the reasonable cost of the proportional benefit upon the assessed parcel:
"No assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel." The following benefit categories summarize the types of special benefit to residential, commercial, industrial and other lots and parcels resulting from the improvements to be provided with the assessment proceeds. These categories of special benefit are supported by various California legislation and supporting studies which describe the types of special benefit received by property from improvements such as those proposed by the Districts. These types of special benefit are summarized as follows:
 Proximity to improved landscaped areas within each District.  Access to improved landscaped areas within each District.

Page 369 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 22  Improved views within each District.
 Extension of property’s outdoor areas and green spaces for properties within close proximity to the improvements.
 Creation of individual lots for residential and commercial use that, in absence of the District and the services provided by the District, would not have been created.

The SVTA decision provides enhanced clarity to the definitions of special benefits to properties in three distinct areas: proximity, expanded or improved access, and views. The SVTA decision also clarifies that a special benefit is a service or improvement that provides a direct advantage to a parcel, and that indirect or derivative advantages resulting from the overall public benefits from a service or improvement are general benefits. The SVTA decision also provides specific guidance that park improvements are a direct advantage and special benefit to property that is proximate to a park improved by an assessment:

The characterization of a benefit may depend on whe ther the parcel receives a direct advantage from the improvement (e.g. proximity to a park) or recei ves an indirect, derivative advantage resulting fro m the overall public benefits of the improvement (e.g . general enhancement of the district’s property values).

Proximity, improved access and views, in addition to the other special benefits listed above, further strengthen the basis of these assessments.

The special benefits from the improvements are further detailed below.

PROXIMITY TO IMPROVED LANDSCAPED AREAS WITHIN THE DISTRICT Only the specific properties within close proximity to the improvements are included in each District.

Therefore, property in each District enjoys unique and valuable proximity and access to the improvements that the public at large and property outside of each District do not share.

In absence of the assessments, the improvements would not be provided and the landscaping areas within each District would be degraded due to insufficient funding for maintenance, upkeep and repair.

Therefore, the assessments provide improvements that are over and above what otherwise would be provided. Improvements that are over and above what otherwise would be provided do not by themselves translate into special benefits but when combined with the unique proximity and access enjoyed by parcels in the Districts, they provide a direct advantage and special benefit to property within each District.

ACCESS TO IMPROVED LANDSCAPED AREAS WITHIN THE DISTRICT Since the parcels in each District are the only parcels that enjoy close access to the improvements, they directly benefit from the unique close access to improved landscaping areas that are provided by the assessments. This is a direct advantage and special benefit to property in that District.

IMPROVED VIEWS WITHIN THE DISTRICT
The Districts, by maintaining these landscaped areas, provides improved views to properties in each District. The properties in a District enjoy close and unique proximity, access and views of the improvements. Therefore, the improved and protected views provided by the assessments are another direct and tangible advantage that is uniquely conferred upon the property within each District.

Page 370 ends

07/08/2025 Item No.17.

City of Folsom
Landscaping and Lighting Districts - Fiscal Year 2025/26 Engineer’s Report 23 EXTENSION OF A PROPERTY’S OUTDOOR AREAS AND GREEN SPACES FOR PROPERTIES WITHIN CLOSE

PROXIMITY TO THE IMPROVEMENTS
In large part, because it is generally cost prohibitive to provide large open land areas in development projects, the residential, commercial and other benefiting properties in each District do not have large outdoor areas and green spaces. The landscaped areas within each District provide additional outdoor areas that serve as an effective extension of the land area for properties that are in close proximity to the improvements. The improvements, therefore, provide an important, valuable and desirable extension of usable land area, which confers a direct advantage and special benefit to properties in close proximity to the improvements.

CREATION OF INDIVIDUAL LOTS FOR RESIDENTIAL AND COMMERCIAL USE THAT, IN ABSENCE OF THE

ASSESSMENTS, WOULD NOT HAVE BEEN CREATED
Typically, the original owner/developer of the property within the Districts can petition the City to establish the assessment districts. As parcels were sold, new owners were informed of the assessments through the title reports, and in some cases, through the Department of Real Estate “White Paper” reports that the parcels were subject to assessment. The purchase of property was also an “agreement” to pay the assessment. In absence of the assessments, the lots within the Districts would probably not have been subdivided and created. These lots, and the improvements they support, are a special benefit to the property owners.

5.2 General versus Special Benefit
The assessments from the Districts are used to fund improvements and increased levels of maintenance to the grounds adjoining the properties in the Districts. In absence of those Districts, such improvements would not be provided and the properties would not have been subdivided and improved to the same extent. The Districts were specifically proposed for formation to provide additional and improved improvements, and services in the Districts. In absence of the assessments, these public resources could not be created and revenues would not be available for their continued maintenance and improvement.

Therefore, the assessments solely provide special benefit to property in the Districts over and above the general benefits conferred by the general facilities of the City.

Although these improvements may be available to the general public at large because the Districts are accessible by members of the public, the improvements within each District were specifically designed, located and created to provide additional and improved public resources for property inside the Districts, and not the public at large. Other properties that are either outside the Districts or within the Districts and not assessed, do not enjoy the unique proximity, access, views and other special benefit factors described previously. These improvements are of special benefit to properties located within the Districts because they provide a direct advantage to properties in the Districts that would not be provided in absence of the assessments.

Page 371 ends