Cities Index.
Agenda packet

Foster City City Council
March 24, 2025

Document
Agenda packet
Meeting
March 24, 2025
Body
Foster City City Council
Pages
10
Original file
16.3 MB
Text extracted from the city's file for reading and search. Open the original on fostercity.primegov.com. That file is the official record.

CITY OF FOSTER CITY/
ESTERO MUNICIPAL IMPROVEMENT DISTRICT
FOSTER CITY COUNCIL CHAMBERS
620 FOSTER CITY BOULEVARD
FOSTER CITY, CALIFORNIA
MEMBERS OF THE PUBLIC THAT WISH TO ATTEND AND/OR PARTICIPATE IN A MEETING MAY DO SO IN PERSON OR BY JOINING THE ZOOM MEETING  HTTPS://FOSTERCITY­ ORG.ZOOM.US/J/82592136594  PUBLIC COMMENTS WILL BE ACCEPTED BOTH IN PERSON AND VIA ZOOM MEETING. ANY EMAILS SENT TO  [email protected] WILL BE PROVIDED TO THE CITY COUNCIL PRIOR TO THE MEETING.

To Attend the Meeting in Person:

Location: 620 Foster City Blvd, Foster City, California, 94404 To Provide Public Comment in Person:

Members of the public wishing to speak will be asked to fill out a Request to Speak Form. Forms will be accepted until the staff presentation on an agenda item ends, or until the public comment period on non­ agenda items is closed. For special meetings, public comment is limited to item(s) on the agenda only.

To Observe the Meeting via Teleconference/Video Conference:

To access the meeting by computer / smartphone, go to:  https://fostercity­org.zoom.us/j/82592136594 To dial­in via phone:
1­669­444­9171 or
1­408­638­0968
And enter Webinar ID: 825 9213 6594
To Participate in the Meeting by Providing Public Comment via Teleconference/Video Conference:

During the Meeting: Live verbal public comments may be made by members of the public joining the meeting via Zoom. Zoom access information is provided above. Use the “raise hand” feature (for those joining by phone, press *9 to “raise hand”) during the public comment period for the agenda item you wish to address. The Zoom Host will call on people to speak by name provided or last 4 digits of phone number for dial­in attendees. Please clearly state your full name for the record at the start of your public comment.

Before the Meeting: Written public comments for the record may be submitted in advance by 4:00 p.m. the day of the meeting by email to:  [email protected]  and will be made part of the written record but will not be read verbally at the meeting. Written public comments submitted by email should adhere to the following:

Clearly indicate the Agenda Item No. or specify “Public” in the Subject Line for items not on the agenda Include the submitter’s full name (Recommended but not required) Written public comments received by 4:00 p.m. the day of the meeting will be provided in their entirety to the City Council prior to the meeting and will be made part of the written record but will not be read verbally at the meeting.

Written public comments will be posted to the City’s website for review prior to the meeting.

AGENDA
Monday, March 24, 2025 6:30 PM
SPECIAL MEETING AS CITY COUNCIL/EMID BOARD OF

DIRECTORS

1. CALL TO ORDER

2. ROLL CALL
Councilmembers/ex officio EMID Directors Art Kiesel, Suzy Niederhofer, Patrick Sullivan, Phoebe Venkat, and Mayor/President Stacy Jimenez

3. PUBLIC
Pursuant to Government Code Section 54954.3(a), members of the public wishing to address the Council may do so, and the comments shall be limited to the Special Meeting notice topic(s). Speakers may join the Zoom meeting via the meeting link and using the “raise hand” feature and the Zoom host will call on people.

4. STUDY SESSION
a) Staff Reports
b) Action – By Minute Order Receive and Accept the Report and Provide Policy Direction

4.1. Five Year Capital Improvement Program FY 2025­2026 to FY 2029­2030

4.2. Fifteen Year General Fund Capital Improvement Projects Program and Funding Plan for the Preparation of the City’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.3. Fifteen Year Water and Wastewater Funds Capital Improvement Projects Program and Funding Plan for the Preparation of the District’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.4. Review of Projected Water Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.5. Review of Projected Wastewater Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.6. Updates To Master Fees and Service Charges Schedule for FY 2025­2026

4.7. Internal Service Funds Summary

4.8. Equipment Replacement Fund and Internal Service Fund Allocations for FY 2025­2026

4.9. Vehicle Replacement Fund Overview and Internal Service Fund Allocations for FY 2025­2026

4.10. Building Maintenance Fund Budget and Internal Service Charges for FY 2025­2026

4.11. Longevity Recognition Benefits Plan and Public Employees' Medical and Hospital Care Act (PEMHCA) Benefits Plan Internal Service Funds

4.12. Compensated Absences Internal Service Fund

4.13. Self­Insurance Fund Budget for FY 2025­2026

4.14. Information Technology Internal Service Fund Budget for FY 2025­2026

5. ADJOURNMENT
The public is invited to attend.

Any attendee wishing special accommodations at the meeting should contact the City Clerk’s Department at (650) 286­3250 or [email protected] at least 48 hours in advance of the meeting. The City has a procedure for receiving and swiftly resolving requests for reasonable accommodation for individuals with disabilities, consistent with the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and resolving any doubt in favor of accessibility.

That procedure for receiving and resolving requests for accommodation is available at the City Clerk’s Office. All meetings are conducted in a manner consistent with applicable civil rights and nondiscrimination laws.

Any writings or documents provided to a majority of the City Council or EMID Board regarding any item on this agenda after the agenda packet was distributed will be made available for public inspection in the City Clerk Department at City Hall located at 610 Foster City Boulevard during normal business hours and at the meeting.

City Council meetings on FCTV on Comcast Channel 27 and AT&T Channel 99:

LIVE every 1st and 3rd Monday of the month
REPLAY next day at 1:00 pm (that week only)
REPLAY Saturday at 5:00 pm (only on Saturday the week the actual meeting occurs) City Council meetings on https://www.fostercity.org/community/page/fctv­live­stream:

STREAMED LIVE every 1st and 3rd Monday of the month
City Council meetings on­demand:
https://www.fostercity.org/agendasandminutes

1 CITY OF FOSTER CITY/
ESTERO MUNICIPAL IMPROVEMENT DISTRICT
FOSTER CITY COUNCIL CHAMBERS
620 FOSTER CITY BOULEVARD
FOSTER CITY, CALIFORNIA
MEMBERS OF THE PUBLIC THAT WISH TO ATTEND AND/OR PARTICIPATE IN A MEETING MAY DO SO IN PERSON OR BY JOINING THE ZOOM MEETING  HTTPS://FOSTERCITY­ ORG.ZOOM.US/J/82592136594  PUBLIC COMMENTS WILL BE ACCEPTED BOTH IN PERSON AND VIA ZOOM MEETING. ANY EMAILS SENT TO  [email protected] WILL BE PROVIDED TO THE CITY COUNCIL PRIOR TO THE MEETING.

To Attend the Meeting in Person:

Location: 620 Foster City Blvd, Foster City, California, 94404 To Provide Public Comment in Person:

Members of the public wishing to speak will be asked to fill out a Request to Speak Form. Forms will be accepted until the staff presentation on an agenda item ends, or until the public comment period on non­ agenda items is closed. For special meetings, public comment is limited to item(s) on the agenda only.

To Observe the Meeting via Teleconference/Video Conference:

To access the meeting by computer / smartphone, go to:  https://fostercity­org.zoom.us/j/82592136594 To dial­in via phone:
1­669­444­9171 or
1­408­638­0968
And enter Webinar ID: 825 9213 6594
To Participate in the Meeting by Providing Public Comment via Teleconference/Video Conference:

During the Meeting: Live verbal public comments may be made by members of the public joining the meeting via Zoom. Zoom access information is provided above. Use the “raise hand” feature (for those joining by phone, press *9 to “raise hand”) during the public comment period for the agenda item you wish to address. The Zoom Host will call on people to speak by name provided or last 4 digits of phone number for dial­in attendees. Please clearly state your full name for the record at the start of your public comment.

Before the Meeting: Written public comments for the record may be submitted in advance by 4:00 p.m. the day of the meeting by email to:  [email protected]  and will be made part of the written record but will not be read verbally at the meeting. Written public comments submitted by email should adhere to the following:

Clearly indicate the Agenda Item No. or specify “Public” in the Subject Line for items not on the agenda Include the submitter’s full name (Recommended but not required) Written public comments received by 4:00 p.m. the day of the meeting will be provided in their entirety to the City Council prior to the meeting and will be made part of the written record but will not be read verbally at the meeting.

Written public comments will be posted to the City’s website for review prior to the meeting.

AGENDA
Monday, March 24, 2025 6:30 PM
SPECIAL MEETING AS CITY COUNCIL/EMID BOARD OF

DIRECTORS

1. CALL TO ORDER

2. ROLL CALL
Councilmembers/ex officio EMID Directors Art Kiesel, Suzy Niederhofer, Patrick Sullivan, Phoebe Venkat, and Mayor/President Stacy Jimenez

3. PUBLIC
Pursuant to Government Code Section 54954.3(a), members of the public wishing to address the Council may do so, and the comments shall be limited to the Special Meeting notice topic(s). Speakers may join the Zoom meeting via the meeting link and using the “raise hand” feature and the Zoom host will call on people.

4. STUDY SESSION
a) Staff Reports
b) Action – By Minute Order Receive and Accept the Report and Provide Policy Direction

4.1. Five Year Capital Improvement Program FY 2025­2026 to FY 2029­2030

4.2. Fifteen Year General Fund Capital Improvement Projects Program and Funding Plan for the Preparation of the City’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.3. Fifteen Year Water and Wastewater Funds Capital Improvement Projects Program and Funding Plan for the Preparation of the District’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.4. Review of Projected Water Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.5. Review of Projected Wastewater Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.6. Updates To Master Fees and Service Charges Schedule for FY 2025­2026

4.7. Internal Service Funds Summary

4.8. Equipment Replacement Fund and Internal Service Fund Allocations for FY 2025­2026

4.9. Vehicle Replacement Fund Overview and Internal Service Fund Allocations for FY 2025­2026

4.10. Building Maintenance Fund Budget and Internal Service Charges for FY 2025­2026

4.11. Longevity Recognition Benefits Plan and Public Employees' Medical and Hospital Care Act (PEMHCA) Benefits Plan Internal Service Funds

4.12. Compensated Absences Internal Service Fund

4.13. Self­Insurance Fund Budget for FY 2025­2026

4.14. Information Technology Internal Service Fund Budget for FY 2025­2026

5. ADJOURNMENT
The public is invited to attend.

Any attendee wishing special accommodations at the meeting should contact the City Clerk’s Department at (650) 286­3250 or [email protected] at least 48 hours in advance of the meeting. The City has a procedure for receiving and swiftly resolving requests for reasonable accommodation for individuals with disabilities, consistent with the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and resolving any doubt in favor of accessibility.

That procedure for receiving and resolving requests for accommodation is available at the City Clerk’s Office. All meetings are conducted in a manner consistent with applicable civil rights and nondiscrimination laws.

Any writings or documents provided to a majority of the City Council or EMID Board regarding any item on this agenda after the agenda packet was distributed will be made available for public inspection in the City Clerk Department at City Hall located at 610 Foster City Boulevard during normal business hours and at the meeting.

City Council meetings on FCTV on Comcast Channel 27 and AT&T Channel 99:

LIVE every 1st and 3rd Monday of the month
REPLAY next day at 1:00 pm (that week only)
REPLAY Saturday at 5:00 pm (only on Saturday the week the actual meeting occurs) City Council meetings on https://www.fostercity.org/community/page/fctv­live­stream:

STREAMED LIVE every 1st and 3rd Monday of the month
City Council meetings on­demand:
https://www.fostercity.org/agendasandminutes

2 CITY OF FOSTER CITY/
ESTERO MUNICIPAL IMPROVEMENT DISTRICT
FOSTER CITY COUNCIL CHAMBERS
620 FOSTER CITY BOULEVARD
FOSTER CITY, CALIFORNIA
MEMBERS OF THE PUBLIC THAT WISH TO ATTEND AND/OR PARTICIPATE IN A MEETING MAY DO SO IN PERSON OR BY JOINING THE ZOOM MEETING  HTTPS://FOSTERCITY­ ORG.ZOOM.US/J/82592136594  PUBLIC COMMENTS WILL BE ACCEPTED BOTH IN PERSON AND VIA ZOOM MEETING. ANY EMAILS SENT TO  [email protected] WILL BE PROVIDED TO THE CITY COUNCIL PRIOR TO THE MEETING.

To Attend the Meeting in Person:

Location: 620 Foster City Blvd, Foster City, California, 94404 To Provide Public Comment in Person:

Members of the public wishing to speak will be asked to fill out a Request to Speak Form. Forms will be accepted until the staff presentation on an agenda item ends, or until the public comment period on non­ agenda items is closed. For special meetings, public comment is limited to item(s) on the agenda only.

To Observe the Meeting via Teleconference/Video Conference:

To access the meeting by computer / smartphone, go to:  https://fostercity­org.zoom.us/j/82592136594 To dial­in via phone:
1­669­444­9171 or
1­408­638­0968
And enter Webinar ID: 825 9213 6594
To Participate in the Meeting by Providing Public Comment via Teleconference/Video Conference:

During the Meeting: Live verbal public comments may be made by members of the public joining the meeting via Zoom. Zoom access information is provided above. Use the “raise hand” feature (for those joining by phone, press *9 to “raise hand”) during the public comment period for the agenda item you wish to address. The Zoom Host will call on people to speak by name provided or last 4 digits of phone number for dial­in attendees. Please clearly state your full name for the record at the start of your public comment.

Before the Meeting: Written public comments for the record may be submitted in advance by 4:00 p.m. the day of the meeting by email to:  [email protected]  and will be made part of the written record but will not be read verbally at the meeting. Written public comments submitted by email should adhere to the following:

Clearly indicate the Agenda Item No. or specify “Public” in the Subject Line for items not on the agenda Include the submitter’s full name (Recommended but not required) Written public comments received by 4:00 p.m. the day of the meeting will be provided in their entirety to the City Council prior to the meeting and will be made part of the written record but will not be read verbally at the meeting.

Written public comments will be posted to the City’s website for review prior to the meeting.

AGENDA
Monday, March 24, 2025 6:30 PM
SPECIAL MEETING AS CITY COUNCIL/EMID BOARD OF

DIRECTORS

1. CALL TO ORDER

2. ROLL CALL
Councilmembers/ex officio EMID Directors Art Kiesel, Suzy Niederhofer, Patrick Sullivan, Phoebe Venkat, and Mayor/President Stacy Jimenez

3. PUBLIC
Pursuant to Government Code Section 54954.3(a), members of the public wishing to address the Council may do so, and the comments shall be limited to the Special Meeting notice topic(s). Speakers may join the Zoom meeting via the meeting link and using the “raise hand” feature and the Zoom host will call on people.

4. STUDY SESSION
a) Staff Reports
b) Action – By Minute Order Receive and Accept the Report and Provide Policy Direction

4.1. Five Year Capital Improvement Program FY 2025­2026 to FY 2029­2030

4.2. Fifteen Year General Fund Capital Improvement Projects Program and Funding Plan for the Preparation of the City’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.3. Fifteen Year Water and Wastewater Funds Capital Improvement Projects Program and Funding Plan for the Preparation of the District’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.4. Review of Projected Water Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.5. Review of Projected Wastewater Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.6. Updates To Master Fees and Service Charges Schedule for FY 2025­2026

4.7. Internal Service Funds Summary

4.8. Equipment Replacement Fund and Internal Service Fund Allocations for FY 2025­2026

4.9. Vehicle Replacement Fund Overview and Internal Service Fund Allocations for FY 2025­2026

4.10. Building Maintenance Fund Budget and Internal Service Charges for FY 2025­2026

4.11. Longevity Recognition Benefits Plan and Public Employees' Medical and Hospital Care Act (PEMHCA) Benefits Plan Internal Service Funds

4.12. Compensated Absences Internal Service Fund

4.13. Self­Insurance Fund Budget for FY 2025­2026

4.14. Information Technology Internal Service Fund Budget for FY 2025­2026

5. ADJOURNMENT
The public is invited to attend.

Any attendee wishing special accommodations at the meeting should contact the City Clerk’s Department at (650) 286­3250 or [email protected] at least 48 hours in advance of the meeting. The City has a procedure for receiving and swiftly resolving requests for reasonable accommodation for individuals with disabilities, consistent with the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and resolving any doubt in favor of accessibility.

That procedure for receiving and resolving requests for accommodation is available at the City Clerk’s Office. All meetings are conducted in a manner consistent with applicable civil rights and nondiscrimination laws.

Any writings or documents provided to a majority of the City Council or EMID Board regarding any item on this agenda after the agenda packet was distributed will be made available for public inspection in the City Clerk Department at City Hall located at 610 Foster City Boulevard during normal business hours and at the meeting.

City Council meetings on FCTV on Comcast Channel 27 and AT&T Channel 99:

LIVE every 1st and 3rd Monday of the month
REPLAY next day at 1:00 pm (that week only)
REPLAY Saturday at 5:00 pm (only on Saturday the week the actual meeting occurs) City Council meetings on https://www.fostercity.org/community/page/fctv­live­stream:

STREAMED LIVE every 1st and 3rd Monday of the month
City Council meetings on­demand:
https://www.fostercity.org/agendasandminutes

3 CITY OF FOSTER CITY/
ESTERO MUNICIPAL IMPROVEMENT DISTRICT
FOSTER CITY COUNCIL CHAMBERS
620 FOSTER CITY BOULEVARD
FOSTER CITY, CALIFORNIA
MEMBERS OF THE PUBLIC THAT WISH TO ATTEND AND/OR PARTICIPATE IN A MEETING MAY DO SO IN PERSON OR BY JOINING THE ZOOM MEETING  HTTPS://FOSTERCITY­ ORG.ZOOM.US/J/82592136594  PUBLIC COMMENTS WILL BE ACCEPTED BOTH IN PERSON AND VIA ZOOM MEETING. ANY EMAILS SENT TO  [email protected] WILL BE PROVIDED TO THE CITY COUNCIL PRIOR TO THE MEETING.

To Attend the Meeting in Person:

Location: 620 Foster City Blvd, Foster City, California, 94404 To Provide Public Comment in Person:

Members of the public wishing to speak will be asked to fill out a Request to Speak Form. Forms will be accepted until the staff presentation on an agenda item ends, or until the public comment period on non­ agenda items is closed. For special meetings, public comment is limited to item(s) on the agenda only.

To Observe the Meeting via Teleconference/Video Conference:

To access the meeting by computer / smartphone, go to:  https://fostercity­org.zoom.us/j/82592136594 To dial­in via phone:
1­669­444­9171 or
1­408­638­0968
And enter Webinar ID: 825 9213 6594
To Participate in the Meeting by Providing Public Comment via Teleconference/Video Conference:

During the Meeting: Live verbal public comments may be made by members of the public joining the meeting via Zoom. Zoom access information is provided above. Use the “raise hand” feature (for those joining by phone, press *9 to “raise hand”) during the public comment period for the agenda item you wish to address. The Zoom Host will call on people to speak by name provided or last 4 digits of phone number for dial­in attendees. Please clearly state your full name for the record at the start of your public comment.

Before the Meeting: Written public comments for the record may be submitted in advance by 4:00 p.m. the day of the meeting by email to:  [email protected]  and will be made part of the written record but will not be read verbally at the meeting. Written public comments submitted by email should adhere to the following:

Clearly indicate the Agenda Item No. or specify “Public” in the Subject Line for items not on the agenda Include the submitter’s full name (Recommended but not required) Written public comments received by 4:00 p.m. the day of the meeting will be provided in their entirety to the City Council prior to the meeting and will be made part of the written record but will not be read verbally at the meeting.

Written public comments will be posted to the City’s website for review prior to the meeting.

AGENDA
Monday, March 24, 2025 6:30 PM
SPECIAL MEETING AS CITY COUNCIL/EMID BOARD OF

DIRECTORS

1. CALL TO ORDER

2. ROLL CALL
Councilmembers/ex officio EMID Directors Art Kiesel, Suzy Niederhofer, Patrick Sullivan, Phoebe Venkat, and Mayor/President Stacy Jimenez

3. PUBLIC
Pursuant to Government Code Section 54954.3(a), members of the public wishing to address the Council may do so, and the comments shall be limited to the Special Meeting notice topic(s). Speakers may join the Zoom meeting via the meeting link and using the “raise hand” feature and the Zoom host will call on people.

4. STUDY SESSION
a) Staff Reports
b) Action – By Minute Order Receive and Accept the Report and Provide Policy Direction

4.1. Five Year Capital Improvement Program FY 2025­2026 to FY 2029­2030

4.2. Fifteen Year General Fund Capital Improvement Projects Program and Funding Plan for the Preparation of the City’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.3. Fifteen Year Water and Wastewater Funds Capital Improvement Projects Program and Funding Plan for the Preparation of the District’s Fiscal Year 2025­2026 Budget and Five­Year Financial Plan

4.4. Review of Projected Water Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.5. Review of Projected Wastewater Rates for FY 2025­2026 to FY 2029­2030 and Policy Direction for Rate Notification Under Proposition 218 and AB 2257

4.6. Updates To Master Fees and Service Charges Schedule for FY 2025­2026

4.7. Internal Service Funds Summary

4.8. Equipment Replacement Fund and Internal Service Fund Allocations for FY 2025­2026

4.9. Vehicle Replacement Fund Overview and Internal Service Fund Allocations for FY 2025­2026

4.10. Building Maintenance Fund Budget and Internal Service Charges for FY 2025­2026

4.11. Longevity Recognition Benefits Plan and Public Employees' Medical and Hospital Care Act (PEMHCA) Benefits Plan Internal Service Funds

4.12. Compensated Absences Internal Service Fund

4.13. Self­Insurance Fund Budget for FY 2025­2026

4.14. Information Technology Internal Service Fund Budget for FY 2025­2026

5. ADJOURNMENT
The public is invited to attend.

Any attendee wishing special accommodations at the meeting should contact the City Clerk’s Department at (650) 286­3250 or [email protected] at least 48 hours in advance of the meeting. The City has a procedure for receiving and swiftly resolving requests for reasonable accommodation for individuals with disabilities, consistent with the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and resolving any doubt in favor of accessibility.

That procedure for receiving and resolving requests for accommodation is available at the City Clerk’s Office. All meetings are conducted in a manner consistent with applicable civil rights and nondiscrimination laws.

Any writings or documents provided to a majority of the City Council or EMID Board regarding any item on this agenda after the agenda packet was distributed will be made available for public inspection in the City Clerk Department at City Hall located at 610 Foster City Boulevard during normal business hours and at the meeting.

City Council meetings on FCTV on Comcast Channel 27 and AT&T Channel 99:

LIVE every 1st and 3rd Monday of the month
REPLAY next day at 1:00 pm (that week only)
REPLAY Saturday at 5:00 pm (only on Saturday the week the actual meeting occurs) City Council meetings on https://www.fostercity.org/community/page/fctv­live­stream:

STREAMED LIVE every 1st and 3rd Monday of the month
City Council meetings on­demand:
https://www.fostercity.org/agendasandminutes

4 DATE: March 24, 2025

TO: Mayor and Members of the City Council
President and Members of the Estero Municipal Improvement District (EMID) Board of Directors
VIA: Stefan Chatwin, City/District Manager
Marlene Subhashini, Assistant City/District Manager

FROM: Andrew Brozyna, Public Works Director/City Engineer Derek Schweigart, Parks and Recreation Director
DEPARTMENT: Public Works
Parks and Recreation
SUBJECT: FIVE YEAR CAPITAL IMPROVEMENT PROGRAM – FY 2025- 2026 TO FY 2029-2030

RECOMMENDATION
It is recommended that the City Council/EMID Board of Directors review the proposed Five- Year Capital Improvement Program – FY 2025-2026 to FY 2029-2030, and authorize City/District staff to include the program in the FY 2025-2026 budget as presented, adjusted, and recommended.

EXECUTIVE SUMMARY
As part of the City/District’s Annual Budget process, City/District staff prepares a Five-Year Capital Improvement Program (CIP) consisting of projects to maintain and enhance the City/District’s infrastructure of roadways, sidewalks, utilities, structures, parks, and facilities for the benefit of the community. Because the costs of such improvements are usually significant, the plan anticipates future costs and sets forth a financial strategy to fund each project over a five-year period.

The proposed five-year Capital Improvement Plan for the period starting FY 2025-2026 is comprised of forty-six (46) projects that require future funding, including additional funding for eleven (11) previously authorized projects and thirty-five (35) new projects over the five- year term. There are descriptions of each project in Attachment 1 that include proposed

4.1 4.1 Staff Report

5 funding sources. Also included in Attachment 1 are status updates for on-going projects that are not recommended for additional funding. A snapshot of all 63 current and five-year proposed projects can be found on Table D, in Attachment 1.

BACKGROUND/ANALYSIS
The proposed FY 2025-2026 to FY 2029-2030 CIP plan consists of forty-six (46) projects to be funded over the next five years from various funding sources. The plan is organized into the following categories: Building, Parks, Stormwater/Lagoon, Streets/Traffic, Water, and Wastewater.

The plan consists of thirty-five (35) new projects and eleven (11) existing projects that require additional funding. Status updates for multi-year projects that do not require additional funding are also included in the CIP document (Attachment 1).

While the Capital Improvement Plan forecasts projects for a five-year period, the City Council approves appropriation of funding on an annual basis only. Table 1 provides a summary of the FY 2025-2026 projects that are recommended for appropriation and their identified funding sources.

Table 1: FY 2025-2026 CAPITAL IMPROVEMENT RECOMMENDED APPROPRIATION

PROJECT NAME FUNDING
SOURCE*
FY 25-26

APPROPRIATION
BUILDING PROJECTS 1,000,000
(NEW CIP) INSTALL ELECTRIC VEHICLE CHARGING
STATIONS (2025-2026) CC $1,000,000
PARKS PROJECTS 467,000
(CIP 301-678) RECREATION CENTER REBUILD (2017-
2018) PIF $467,000
STREET/TRAFFIC SIGNAL PROJECTS 2,000,000
(NEW) STREET REHABILITATION (2025-2026) GT/SB1 $2,000,000 STORM WATER/LAGOON PROJECTS 7,000,000
(CIP 301-717) LAGOON PUMP STATION

REHABILITATION AND CAPACITY ENHANCEMENT
(NEW NAME) (2023-2024)
CC $6,950,000
(CIP 301-722) LAGOON INTAKE STRUCTURE
REHABILITATION (2024-2025) CC $50,000
WATER PROJECTS 800,000
(CIP 405-723) WATER MAIN CONDITION ASSESSMENT CW $500,000 (NEW CIP) PERMANENT EMERGENCY BYPASS
TRANSMISSION MAIN ON E. THIRD AVE. CW $300,000
WASTEWATER PROJECTS 18,409,017
(401-652) WASTEWATER TREATMENT PLANT MASTER
PLAN IMPROVEMENTS (2015-2016) CWW $8,090,017

4.1 4.1 Staff Report

6 (CIP 455-806) EMERGENCY GENERATOR
REPLACEMENTS (2021-2022) CWW $2,000,000
(CIP 455-710) SHELL BRIDGE SANITARY SEWER
FORCE MAIN REHABILITATION (2022-2023) CWW $500,000
(CIP 455-719) SANITARY SEWER LIFT STATION
IMPROVEMENTS - - PHASE 6 (2023-2024) CWW $7,900,000
TOTAL, ALL PROJECTS (FY 2024-2025 Appropriation) 29,676,017 * CC=CIP City; CW=CIP Water; CWW=CIP Wastewater; GT=Gas Tax; PIF=Parks Facilities Infrastructure Fees; SB1=CA Road Repair and Accountability Act of 2017
Full project descriptions and details on these projects, as well as projects in years two through five of the five-year plan, the status of ongoing CIP projects that do not require appropriation in FY 2025-2026, and the fiscal impact to each fund can be found in Attachment 1, the Capital Improvement Program FY 2025-2026 to FY 2029-2030.

STRATEGY FOR THE FUTURE
This Capital Improvement Plan is both fiscally and operationally ambitious. Completing and closing existing projects, especially those in the construction phase, is a top priority for the Public Works Department. This Council item addresses Council appropriations for FY 2025- 2026 and the plan for funding projects for the additional four years after that. Within this framework, staff balances projects based upon project priority and staffing workload, and includes the Executive Leadership Team in discussions of priority shifts throughout the year.

The Executive Leadership Team has reviewed and is supportive of the preliminary CIP work plan for FY 2025-2026.

While the Engineering Division does rely on consulting services for technical assistance, City staff is key to executing, completing and closing out capital improvement projects. The City Council has been proactive in authorizing staffing levels to meet this goal, and the Public Works Department has worked hard to maintain staffing levels in the current challenging economy. The Engineering Division is currently fully staffed with an Engineering Manager, three Senior Engineers and three Assistant/Associate Engineers, and the Department is recommending that the City Council authorize an additional engineer starting in FY 2025-2026, specifically to focus on Water and Wastewater projects. The Human Resources and Public Works teams continue to work to recruit for and fill key vacancies that are, and will continue to be, essential to the Capital Project process.

CEQA
Not Applicable

FISCAL IMPACT
To the extent possible, every effort has been made to program funding for the Capital Improvement Program Plan with non-General Fund funding sources. In Fiscal Year 2025- 2026, of the total CIP budget of $29,676,017, the General Fund has been identified as the

4.1 4.1 Staff Report

7 funding source for $8,000,000, or just under 27%, with the remainder identified from the Wastewater Enterprise, internal service funds, and development impact fees.

CITY COUNCIL VISION, MISSION, AND VALUE/PRIORITY AREA
Facilities and Infrastructure
Smart Planning, Development, and the Local Economy
ATTACHMENTS:

Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030 oPages 1-14: Status Updates of all currently open projects, not recommended for additional funding
oPages 15-16: Overview of Capital Improvement Plan Development Process oPages 17-27: Summary Project Table and Backup Tables A-D oPages 28-79: Full project descriptions and details of projects recommended for funding in FY 2025-2026 through FY 2029-2030

4.1 4.1 Staff Report

8 Capital Improvement Program
The Capital Improvement Program (CIP) consists of projects to maintain and enhance the City/District’s infrastructure of roadways, sidewalks, utilities, structures, and facilities for the benefit of the community.

The primary objective of the CIP is to develop and implement projects to ensure continued and reliable delivery of service to meet the City/District’s needs. The following is a summary of active projects to be managed during Fiscal Year 2025-2026.

Ongoing Projects:
(CIP 301-635, Budget $919,169 Median Modifications – Foster City Boulevard at Chess Drive – Multi-Project #3 (2013-2014)
The project addresses improvements at the intersection of Foster City Boulevard and Chess Drive. The project includes lengthening the northbound left-turn lanes on northbound Foster City Boulevard at Chess Drive to reduce the likelihood of traffic queues extending out of the turn lanes into the through traffic lanes on Foster City Boulevard.

On August 4, 2014, the City Council adopted Resolution No. 2014-86 authorizing an agreement with BKF Engineers, Inc. to prepare construction contract documents and provide construction support services for CIP 301-635. Design is complete and the Caltrans encroachment permit has been issued to the City. Call for bids is scheduled this spring.

This project was one of several projects identified as part of the Multi-Project Roadway Improvements that were funded by four developments based on each development's contribution to traffic impacts. The funds were identified in each development's Master Development Agreement and each development’s cost share was allocated to CIP 301-635. Construction is anticipated to commence in summer 2025.

Project Timeline:

Design: Completed
Construction: FY 2025-2026

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

9 (CIP 455-652, Budget $162,519,482) Wastewater Treatment Plant Master Plan Improvements (2015-2016)
In 2024 (year 10), the CWP continued to focus on the construction phase of the WWTP project to assist with full project delivery and execution of major improvement projects. Some notable accomplishments include the following:

WWTP Upgrade & Expansion Project
GMP-1 (Site Preparation, Electrical and Storm Drain System Improvements for GMP3) - Continued project closeout.

GMP-2 (Foundations for GMP3) - Project was closed out and accepted.

GMP-3 (Nutrient Removal and Wet Weather Flow Management Upgrade and Expansion) • Completed all yard piping with the exception of the final connections of the force mains to the new headworks.
• Achieved Substantial Completion for the Administration Building. • Completed the installation of the canopy and tanks in Area 70 • Achieved Substantial Completion for the new Warehouse. • Completed the leak testing for all basins.
• Continued the improvements to the foul air system in the primary screens, grit chambers, and grit wash equipment in Area 51.
• Completed Area 52 ‘s primary clarifiers.
• Completed the installation of the Membrane Bioreactor Filters in September 2024. • Started site landscaping and hardscape improvements.
• Began on site paving and replacement of paving of Detroit Drive.

Immediate Action Project Package 2 – Improvements to the solids processes • Completed modifications to the new hopper and its sensors. • Replaced the mitered piping and installed pipe supports for one of the cake pumps.

Annual Major Components
• Digester Transfer Pump Improvements: Transfer pumps arrived on site in July 2024. Completion of this project is scheduled for April 2025.
• 3 Water Pumping and Ferric to Combined Sludge Improvements: Design is anticipated to be completed by early Summer 2025.
• Other AMC Packages: Biosolids and Energy Management Plan (Brown and Caldwell awarded contract to perform study. Study estimated completion is 2026); DAFT Corrosion Improvements (Carollo awarded contract to perform study. Study estimated completion is Spring 2025); Digester 1 Improvements (pending results of Biosolids study); Centrifuge and Centrifuge Feed Pump Replacement (planning phase); Solids Handling Systems I&C Improvements (planning phase) Erler & Kalinowski, Inc. is continuing to provide technical support services for EMID.

Project Timeline:

Construction: Ongoing through FY 2026-2027

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

10 (CIP 327-657 (formerly CIP 301-657), Budget $94,900,137) Levee Protection Planning and Improvements Project (2015-2016)
Construction was completed in February 2024, and the Notice of Completion accepted by the City Council on May 6, 2024.

The Bay Trail was re-opened to the public in three different phases:

1. Phase 1 (Southern portion of project to Shorebird Park) - Opened March 27, 2023.

2. Phase 2 (Shorebird Park to Bridgeview Park) - Opened August 23, 2023

3. Phase 3 (Bridgeview Park to the City limits at the Mariner’s Point Golf Course) - Opened October 7, 2023.

Post construction landscape maintenance over the first year following plant installation is complete.

Remaining work includes: post-construction environmental monitoring for two more years; easement acquisition at the various access points that abut private developments; pursuit of FEMA accreditation; pursuit of an amendment to the BCDC Permit to reflect design changes; installation of interpretive signage; repair of damaged sprinkler systems and landscaping at 2 HOAs; and regulatory permit close- out.

Project Timeline:

Design: Complete
Construction: Complete
Closeout and Post Construction Activities: Ongoing
(CIP 301-677, Budget $120,000) Library Exterior Wall Sealing and Tile Installation (2017-2018) This project will complete the Library building exterior improvements on the southwest side of the building by providing for permanently removing earth around the southwest wall of the library building, sealing the wall, installing wall drains and drainpipes, re-grading the earth around the exterior of the building, and investigating the extent of tree root intrusion along the north wall.

Staff has cured prior water intrusion issues by removing soil away from the northwest wall of the building.

Half of the area has been re-landscaped in house by Parks staff into an attractive drought tolerant and water efficient habitat garden.

Funding in the amount of approximately $38,000 from this project was utilized in FY 2024-2025 to improve the curb ramps at the Library/Community Center building to current Americans with Disability Act (ADA) standards. This project has been re-prioritized based on staff capacity.

Project Timeline:

Design: FY 2026-2027
Construction: FY 2027-2028
(CIP 301-678, Budget $61,034,770) Recreation Center Rebuild Project (2017-2018) On June 3, 2024, the City Council approved the plans and specifications and authorized the issuance of call for bids for the Project. At this time there was an approved budget of $55,432,578 which included an additional $58,323 to the total approved budget for plan check services with West Coast Code Consultants (WC3) (City Council Resolution No. 2024-21 on April 1, 2024).

On June 17, 2024, the budget was adopted for fiscal year 2024-2025 which increased the overall budget of the project to $64,525,328.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

11 On September 3, 2024, the City Council approved a resolution awarding a construction contract to BHM Construction, LLC for the Base Lump Sum of $40,647,000 plus the following bid alternates in the amount of $3,979,000:
• A1 Expanded Entry Canopy
• A3 Fitness Room Operable Partition
• L1a Playground with Play Equipment (Option 2 – Playcraft) and Rubberized Safety Surfacing • L2 Event Terrace Glass Wind Screen
• L3 Bocce Courts Expansion
• E1 Photovoltaic Panel System (without Battery Storage) The total construction contract awarded to BHM Construction including bid alternates was $44,626,000.

At its meeting on September 16, 2024, the City Council adopted Resolution No. 2024-100 reducing the total approved project budget by $3,490,558, to $61,035,000.

Following the award of the construction contract, a notice to proceed was issued to BHM on November 4, 2024. Construction has begun on the project and is expected to be completed in June 2026.

Project Timeline:

Pre-Design/Design: Complete
Construction: FY 2024-2025 – FY 2026-2027
(CIP 301-682, Budget $579,803) Park System Master Plan (2018-2019) Initiated in FY 2018-2019, the Parks Master Plan was designed to strategize the maintenance, replacement, and upgrade of the city’s parks. The project was initially handled by Placeworks, Inc. after the City Council's approval in December 2018, but stalled during the Covid pandemic. Interest resumed in Spring 2021, leading to increased funding for community engagement in FY 2021-2022, with significant progress marked by the acceptance of Parks Survey results in January 2022.

In December 2023, the City Council renewed the project by issuing an RFP for consultancy services.

Wallace Roberts & Todd Design, LLC (WRT) secured the contract in May 2024. WRT’s responsibilities include drafting the master plan, performing an inventory and assessment, managing the project, driving public involvement, collaborating with city staff, and preparing a public distribution document, encapsulating a renewed effort to enhance the city’s park infrastructure.

Project Timeline:

Community Engagement/Survey: 2024-2025
Plan Development: FY 2024-2025 and FY 2025-2026
(CIP 301-685, Budget $2,040,000) HVAC Improvements in City Buildings (2018-2019) Due to the age of the Heating/Ventilation/Air Conditioning (HVAC) system at the Corporation Yard and changes in HVAC technology for this type of building, the existing system cannot be refurbished and needs to be replaced. Additionally, the project will also consist of replacing 3 HVAC package units in the roofs of City Hall and the Fire Station as they are at the end of their useful lives.

This project is currently being evaluated by staff with the intention to start Design in Summer 2025.

Project Timeline:

Design: FY 2025 - 2026
Construction: FY 2026 - 2027

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

12 (CIP 455-695, Budget $1,800,000) Lift Station 59 Effluent Line Improvements (2020-2021) The project consists of improvements to the effluent line at Lift Station 59, located in the District’s Corporation Yard, including replacing the existing ultrasonic effluent flow meter with a new electromagnetic flow meter; installing a permanent emergency bypass to provide operational flexibility and redundancy; and replacing the existing 24” ball valve on the discharge force main.

On February 1, 2021, the EMID Board approved the award of engineering design services to BKF Engineers. On June 20, 2023, the EMID Board rejected the sole construction bid due to it being well above the engineer’s estimate and approved further design work to clarify plans and specifications. The project was rebid in 2024, with Performance Mechanical Inc., being awarded the construction contract.

Notice to proceed is being issued in 2 parts. The Notice to proceed for procurement of long lead equipment was issued in Winter 2024. Construction is expected to commence in August 2025.

Project Timeline:

Procurement: Ongoing
Construction: FY 2025-2026
(CIP 301-698, Budget $1,625,000) Traffic Signal System Upgrades (2020-2021) The City’s traffic signal system was evaluated as part of the Bicycle, Pedestrian, and Intersection Evaluation Study (CIP 301-664). This project is built upon recommendations from CIP 301-664 and will include the following tasks for design and construction:

1. Citywide Communications Upgrade

2. Traffic Signal Field Hardware (Signal Heads and Accessible Pedestrian Signals Replacement)

3. Upgrade Traffic Signal Cabinets to NEMA TS-2

4. Replace Traffic Signal Controllers

5. Advanced Traffic Management System (ATMS) (Central Computer System Upgrade) .

A Technical Memorandum will be prepared by one of the City’s on-call Traffic Engineering firms to develop a phasing plan for design and construction.

Project Timeline:

Technical Memorandum: FY 2025-2026
Design: FY 2025-2026 to FY 2026-2027
Construction: FY 2026-2027 to FY 2027-2028
(CIP 301-700, Budget $4,222,000) Fuel Systems Improvements (2021-2022) The project consists of the replacement of unleaded and diesel underground fuel storage tanks located at the City’s Corporation Yard, with above grade tanks to meet regulatory requirements.

A preliminary assessment of the City’s fuel systems was performed in FY 2021-2022 confirming the need for complete replacement of both the diesel and unleaded systems. On January 17, 2023, the City Council approved the issuance of an RFP for professional design services. On May 1, 2023, the City Council approved a design agreement with TAIT Environmental Services for design of the project. Project design was completed and City Council/EMID Board approved the plans and specifications for public bid by resolution number 2024-109 and 3779 at their October 21st 2024 meeting.

The City Council/EMID Board approved a construction agreement with West Star Environmental, Inc. by resolution number 2024-131 and 3787 at their December 16, 2024 meeting. A Notice to Proceed has been issued for the procurement of the tanks (long lead items) with construction starting in May 2025 and expected to continue through October 2025.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

13 Project Timeline:

Preliminary Assessment: Complete
Design: Completed
Construction: FY 2024-2025- FY 2025-2026
(CIP 405-704, Budget $1,250,000) Large Water Meter Replacements (2021-2022) The project consists of the removal and replacement of various large water meters throughout the District.

A survey that was conducted in 2022 identified several large water meters that are due for replacement.

These meters are currently under-registering and do not account for the full cost of water usage. Due to their size and lay length differences, many will require new meter boxes and reconfiguration of piping to and from the new meters, and therefore their replacement cannot be performed in house by staff.

The Water Maintenance Division has replaced smaller meters (4-inches and under) over the past couple of years and will continue its efforts to replace those meters that can be done in house.

Staff has analyzed and prioritized a list of water meters based on factors such as remaining useful life, the greatest calculated lost revenue, and performance. It is anticipated that following replacement of these inaccurate meters, EMID could recover the cost of replacing most of the meters within a few years.

During FY 2024-2025, staff completed a physical inspection and inventory of all 34 meter locations. Staff is currently preparing construction documents in-house. Construction is anticipated in Fall 2025.

Project Timeline:

Assessment: FY 2023-2024 to FY 2024-2025
Design: Spring/Summer 2025
Construction: FY 2025-2026
(CIP 455-705, Budget $4,200,000) Emergency Generator Replacements (2021-2022) This project addresses the replacement of certain emergency generators and automatic transfer switches that are located at 10 of the District’s wastewater lift stations and are at the end of their useful life as follows: the emergency generators and automatic transfer switches at Lift Stations 10, 12, 14, 15, 16, 26, 29, 40 and 59 and the emergency generator only at Lift Stations 22. In June 2022, staff issued an RFP to procure the services of a design firm to address the replacement of the emergency generators and transfer switches for 2 locations (LS 29 and 59) and replacement of the emergency generator only at LS 22 that required accelerated replacement due to frequent repairs being required and their importance to the overall sewer system.

On August 15, 2022, the District Board adopted EMID Resolution 3672 approving a professional services agreement with Freyer & Laureta, Inc for design services of three critical and complex generator replacements at LS 22, 29 and 59.

On August 19, 2024, the District Board approved EMID Resolution 3772 to purchase agreement with Bay City Electric Works for the three priority generators at LS 22, 29 and 59 (up to 1 year lead). An order for the generators is anticipated to be placed in March 2025. An amendment to the existing contract with Freyer & Laureta through EMID Resolution 3784 was approved by the District Board on November 4, 2024, to include the remaining 7 generators at LS 10, 12, 14, 15, 16, 26 and 40 into the design phase.

Design for the original priority 3 generators is anticipated to be completed by Summer 2025 and Design for the remaining 7 to follow in Winter 2025 with the intent to bid all ten generators together soon after.

Project Timeline:

Design: On-going
Construction: FY 2026-2027

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

14 (CIP 301-707, Budget $500,000) Install Rear Security Gates (2022-2023) The project includes the purchase and installation of security gates for the safety of public and for emergency vehicle movement in the driveway behind the Police Station/Fire Station/City Hall. In addition to the gates themselves, the project will require loop detectors, UL-required safety devices, and local controls as well as electrical and concrete work, which could include curb modifications and trenching/ back filling for power and control wiring.

Project Timeline:

Design: FY 2024-2025
Construction: FY 2025-2026
(CIP 301-708, Budget $1,000,000) Renovate Elevators in City Buildings (2022-2023) The project addresses replacing essential elevator components in 4 elevators located in City buildings.

The elevators are experiencing an increasing number of failures as they age, and replacement parts are difficult or impossible to procure. The goal is to modernize these elevators and bring them into compliance ADA specifications. This project is currently being prepared to start design and construction of the Community Center elevator in Spring 2025 and projected to be in construction in Winter 2025 for the remaining elevators.

Project Timeline:

Design: FY 2024-2025
Construction: FY 2025-2026
(CIP 455-710, Budget $1,000,000) Shell Bridge Sanitary Sewer Force Main Rehabilitation (2022-2023)
The project will address the rehabilitation or replacement of the 16” cast iron force main attached to the Shell Bridge. In May 2023, thickness testing along the pipe span was performed to evaluate the current condition of the pipe wall and determine if additional areas of the pipe would need rehabilitation. A Technical Memorandum was prepared documenting the field investigation findings. Based on the investigation, additional sections of the pipe are experiencing wear and require rehabilitation to extend the useful life of the pipe. A feasibility study is currently being performed to determine if lining the pipe is possible. The study will determine if rehabilitating the pipe is the next step or constructing a new pipe is the best option. Design is anticipated to start in late 2025.

Project Timeline:

Design: FY 2025-2026 to FY 2026-2027
Construction: FY 2026-2027
(CIP 301-711, Budget $130,000) Police Station Kitchen Remodel (2023-2024) The project addresses the remodel of the kitchen, and two kitchenettes located within the Police Station.

An overhaul of the kitchen to install new cabinets, countertops, sink, appliances, additional storage, and repair the adjacent wall will tackle many issues identified by users of the space. Additionally, the 2 kitchenettes located in the station’s management office and dispatch room will be reconfigured to optimize the use of the space to accommodate employees while eating. A preliminary assessment was done in October 2024 and a bid package is currently being prepared for advertisement with a construction target date expected to be summer 2025.

Project Timeline:

Design/Construction: Winter/Summer 2025

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

15 (CIP 301-713, Budget $250,000) Light installation at Boothbay Park (2023-2024) This project will enhance the accessibility and utilization of the Tennis Courts at Boothbay Park by installing new infrastructure and appropriate lighting system. The addition of lights will expand the hours that the community and user groups can take advantage of the tennis courts and increase overall capacity in the City for greater play. This project will be scheduled after other priority projects are addressed.

Project Timeline:

Design: To be scheduled based on staff resources
(CIP 301-714, Budget $300,000) Sea Cloud Maintenance Shed (2023-2024) The Sea Cloud Park maintenance facility serves as the central hub for storing both light and heavy park maintenance equipment, providing a dedicated workspace and break area for staff, and offering storage accommodations for sports user groups. Despite undergoing multiple roof repairs to combat persistent leaks, the building has incurred significant dry rot and underlying structural challenges over time.

Recognizing these deficiencies, the primary objective of the upcoming project is to replace the structure.

An initial structural assessment was conducted as a part of CIP 301-693 Roof Replacements at City Buildings. The findings of the structural assessment found that there is no immediate need to replace the building, and it is acceptable to address the replacement project at a future date, as staffing permits.

Additional funding is programmed for construction in the five-year CIP. This project will be scheduled after other priority projects are addressed.

Project Timeline:

Design: To be scheduled based on staff resources
(CIP 301-715, Budget $1,150,000) Substructure and Superstructure Bridge Improvements (2023-2024)
This project addresses deficiencies in Bicentennial, Foster City Boulevard, Rainbow, and Shell Boulevard Bridges. Caltrans performs inspections of the above water bridge elements every two years and the underwater elements every five years and reports its findings to the City. The project will address deficiencies identified in the Caltrans inspection documents and any deficiencies identified by an engineering firm working directly for the City. As no addressable deficiencies have been identified in Caltrans underwater inspections, the project budget does not include funds to repair underwater bridge elements. Additional funding may be requested for the design and construction of underwater bridge improvements, if any are identified.

The design for this project will be conducted in two phases. The initial phase entails conducting a thorough examination of previous Caltrans bridge inspection reports alongside current on-site inspections.

This process will result in the development of a Basis of Design report delineating the elements requiring improvements. The second phase will consist of the development of construction documents, including bid and construction support services. The design of the project was temporarily put on hold in FY 2024-2025 while other priority projects are addressed and will be scheduled after other priority project have been completed.

Project Timeline:

Design: To be scheduled based on staff resource

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

16 (CIP 301-716, Budget $2,678,247) Street Rehabilitation (2023-2024) This project will repair/resurface the following areas: the portion of Edgewater Blvd south of Beach Park Blvd, the entirety of E. 3 rd Ave, and the brick intersection on E. Hillsdale Blvd at Center Park Ln. The original scope of the project also included regarding on Shell Blvd near the driveway at Beach Park Elementary School, and $300,000 of work towards Park pathway restoration, which included repairing/ resurfacing of portions of the pathways in Sea Cloud Park and Boothbay Park and replacing cracked concrete entrances with asphalt at Sunfish, Turnstone, and Marlin Parks. However, no bids were received at the original bid opening on May 9, 2024, and the original scope of the project was revised to remove the Shell Blvd regrade work t and the park pathway restoration scope to reflect contractor feedback to make the street rehabilitation project more competitive in the market.

On July 1, 2024, City Council adopted Resolution 2024-70 authorizing the award of the construction contract to G. Bortolotto & Company, Inc for the construction of the project with the modified scope.

On January 21, 2025, City Council adopted Resolution 2025-5, which included authorizing the transfer of $300,000 of CIP City Funds from this project (CIP 301-716) to Park Pathway Restoration Project 2024-2025 (New CIP), since the park pathway restoration scope was not completed with this project.

Construction started in August 2024 and is anticipated to be completed by Spring 2025.

Project Timeline:

Design: Complete
Construction: FY 2024-2025
(CIP 301-717, Budget $2,000,000) Add Third and Fourth Lagoon Pump and Related Infrastructure (2023-2024)
The project consists of adding a third and possibly fourth lagoon pump at the City’s corporation yard in the existing partially decommissioned pump station bays in order to ensure redundancy during large storms and into the future with climate change.

The project kicked off in late 2023 with initialization of a preliminary engineering analysis on third pump feasibility and constructability alongside CIP 718 analyzing the lagoon pump station’s structural integrity to ensure adding a third and possibly fourth pump to the existing building was practicable. Preliminary Engineering was completed in July 2024.

Following the preliminary engineering, staff scoped an RFP for the combined design of this project and CIP 718 Lagoon Pump Station Building Rehabilitation, solicited proposals from the City’s on-call consultants, and awarded an agreement to begin design for a combined project. This project and budget will be combined with CIP 718 and renamed the (CIP 301-717) Lagoon Pump Station Rehabilitation & Capacity Enhancement Project. The project is planned to be designed in parallel but to be constructed in phases due to long lead time items.

Project Timeline:

Design: FY 2023-2024 – FY 2025-2026
Construction: FY 2026-2027 - FY 2027-2028
(CIP 301-718, Budget $670,000) Lagoon Pump Station Building Rehabilitation (2023-2024) The project consists of rehabilitation on the City’s lagoon pump station. The lagoon pump station was built in the early 1960’s and is one of the City’s oldest buildings. In several locations, significant amounts of concrete have spalled away which adversely affects the structural integrity of certain elements of the facilities. In addition, numerous structural code changes have been adopted since the design of this building. In a report prepared by Murray Smith, Inc. in May 2021, as part of CIP 301-690 Seismic Improvements project, recommendations were made to perform an in-depth evaluation of the building to

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

17 include additional structural evaluation of the lagoon pump station building and the below water structures based on current building code standards. The recommendation included further structural investigation and analysis of the lagoon walkway, channels, trash racks (previously replaced in 2010), and foundation, to determine potential structural deficiencies.

Structural investigation kicked off in late 2023 with preliminary engineering investigating the existing structure to recommend next steps of further destructive testing, rehabilitation programming, or new construction, if necessary. Preliminary Engineering was completed in July 2024.

Following the preliminary engineering, staff prepared an RFP that included the scope to design this project with CIP 717- Add Third and Fourth Lagoon Pump and Related Infrastructure, solicited proposals from the City’s on-call consultants, and awarded an agreement to begin design for a combined project.

This project and budget will be combined with CIP 717 and renamed the (CIP 301-717) Lagoon Pump Station Rehabilitation & Capacity Enhancement Project (CIP 301-717). The project is planned to be designed in parallel but to be constructed in phases due to long lead time items.

Project Timeline:

Design: FY 2023-2024 – FY 2025-2026
Construction: FY 2026-2027 – FY 2027-2028
(CIP 455-719, Budget $600,000) Sanitary Sewer Lift Stations Improvements - Phase 6 (2023-2024) This project was identified in the District’s Wastewater Collection System Master Plan, and will address deficiencies at Lift Stations 6, 9, 11, 13, 22, 29, 42 and 43. Lift station improvements generally include repairing the interior wet wells; replacing critical components, and electrical improvements including installation of additional systems to remotely monitor and control the lift stations. Design is anticipated to begin in FY 2025-2026 using the City’s on-call water and wastewater consultant pool.

Project Timeline:

Design: FY 2025-2026
Construction: FY 2026-2027
(CIP 301-720, Budget $200,000) City Hall Exterior Rehabilitation (2024-2025) Due to drought restrictions, the water features located at the front of City Hall have been inactive for several years. This project involves design and construction of City Hall exterior improvements, including removal of the water feature closest to the council chambers. In its place, a shade structure with seating elements will be installed. Simultaneously, the fountain near the clock tower will be repurposed, transforming into a large planting bed equipped with drip irrigation. The landscaping along Hillsdale Blvd will undergo a refresh, replacing existing ground covers and converting to point source irrigation. This project will adopt a hybrid procurement approach, involving a combination of both City and contracted staff.

Project Timeline:

Design: FY 2024-2025
Construction: FY 2025-2026
(CIP 301-721, Budget $30,000) Lagoon Intake Structure Rehabilitation (2024-2025) This project will rehabilitate or repair the headwall and flap gates at the discharge of the lagoon intake near Wheel House Lane. Permits for this work are likely needed from both the Regional Water Quality Control Board (RWQCB) and the United States Army Corps of Engineers. (USACE). While these permits are not expected to place onerous restrictions on the project, they will take around 6 months to obtain and will restrict the working window for the project, which will impact project delivery time.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

18 A condition assessment is underway and expected to set timelines for the repairs/replacement by end of year. Depending on this assessment, the project may move into design in FY 2025-2026 or push into future years.

Project Timeline:

Technical Memo: FY 2024-2025
Design: FY 2025-2026
Construction: FY 2026-2027
(CIP 301-722, Budget $1,500,000) Street Rehabilitation (2024-2025) The Street Rehabilitation Project will focus on repair/resurfacing for Neighborhood Six, which includes Halsey Blvd/Farragut Blvd to Beach Park Blvd., Bainbridge St., Decatur St., Blythe St., and Burrows St.

Additional roadway improvements include grading adjustments along Shell Blvd. at the northern driveway to Beach Park Elementary School, crosswalk installation at Boothbay Ave and Galveston St., and a large base repair on Beach Park Blvd. near the northern intersection with Vega Circle.

All locations identified above include striping and signage improvements, utility adjustments if necessary, and the retrofitting of existing non-compliant curb ramps in conformance with ADA and the City’s Transition Plan, and the application of red paint within 20 feet of the vehicle approach side of crosswalks as required by Assembly Bill 413 (AB413). AB413 is a new state law which helps increase the visibility of pedestrians and bicyclists entering crosswalks.

Design was completed in-house January 2025. On January 21, 2025, City Council adopted Resolution 2025-5 approving the plans and specifications and authorizing the call for bids for the project.

Construction is anticipated to start May 2025.

Project Timeline:

Design: Complete
Construction: FY 2024-2025 - FY 2025-2026
(CIP 405-723, Budget $250,000) Water Main Condition Assessment (2024-2025) This project is identified in the Water Distribution System Master Plan (Master Plan). This project’s purpose is to identify any existing leaks and existing vulnerabilities along the main and make recommendations for repair and rehabilitation. Various non-destructive technologies will be employed to assess and inspect the main. Collectively, the data gathered from the inspections will help to identify locations along the pipeline alignment where there are leaks, coating and/or lining damage, or where the pipe wall is thinning. The findings from this assessment will help the District prioritize future improvements. A Technical Memorandum will be prepared summarizing the findings and including recommendations for Capital Improvement Projects with engineer’s cost estimates. Staff will analyze the summary of recommendations for incorporation into the City’s CIP. The City Council awarded a contract to Kayuga Solutions, Inc. on March 3, 2025, to perform the condition assessment.

Project Timeline:

Study Period: April to October 2025
(CIP 301-724, Budget $600,000) Park Pathway Restoration (2024-2025) This project will address restoration for park pathways across City Parks at locations identified by Parks Staff. Improvements will include removing and replacing failed and root-damaged asphalt, slurry seal, digouts, concrete entrance replacements, concrete curb adjustments, and if needed, line striping.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

19 This project scope was originally included in the annual Street Rehabilitation Projects of FY2024 and FY2025 (CIP301-716 and CIP301-722). However, based on industry feedback, park pathway restoration work is too dissimilar to street rehabilitation efforts and is a deterrent to bidders for street rehabilitation projects. Consequently, the park pathway restoration work was removed from the street rehabilitation projects to be completed as a separate project. On January 21, 2025, City Council adopted Resolution 2025-5 transferring $300,000 reserved for park pathway restoration work from both CIP301-716 and CIP301-722 to fund a new CIP, now numbered as CIP301-724, for park pathway restoration work.

Project Timeline:

Design/Construction: To be scheduled based on staff resources

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

20 PROJECTS COMPLETED BUT NOT YET CLOSED IN FY 2024-2025 (CIP 405-660, Budget $5,800,000) Water Tanks and Facilities Improvements (2016-2017) The water storage tanks provide water storage for emergencies, peak use periods, and firefighting. The project addressed improvements to the three steel water storage tanks and the water booster pump station. The scope of work consisted of (1) refurbishing the 3 steel tanks by repairing corroded steel areas, and applying spot coating to the interior and a full coating to exterior surfaces; (2) installing water mixing devices inside the 3 steel tanks to prolong water quality; (3) seismically retrofitting the existing drainpipes and installing new drainpipe at the side of the tanks; and (4) reinforcing the door frame to the water booster pump station and installing flexible connections on the underground utilities entering the building. Construction was completed in Spring of 2025. (CIP 301-690, Budget $550,000) Seismic Improvements at Lagoon Pump Station (2019-2020) The Lagoon Pump Station houses two (2) engines and pumps used to pump water from the lagoon to the bay and controls the water level in the lagoon. G&E Engineering Systems, Inc., completed a seismic vulnerability assessment of the building that concluded that the building meets the seismic code and recommended various improvements including (1) reinforcing the door frame of the roll-up door, (2) isolating the tidal channel walls from the north walkway of the building, (3) installing flexible connections on the underground utilities entering the building and fuel lines from the walls to the engines, and (4) securing equipment and shelving within the building. In addition, staff identified significant areas of spalling concrete and rusting reinforcing steel (rebar) along the concrete walkway connected to the building. Construction for recommendations 2-4 were completed in 2024 and early 2025. A separate CIP (CIP 301-718) has been created to address the rehabilitation of the lagoon pump station building in its entirety including addressing the reinforcement of the door frame (item 1) and replacement of the concrete walkway.
(CIP 301-699, Budget $200,000) Corporation Yard Workshops Exterior Paint (2020-2021) The Corporation Yard Shops were last painted in 2007. Repairs to the building exteriors, such as replacing dry-rotted wall sheathing was completed as part of CIP 301-693 Roof Replacements Project.

Building Maintenance has now completed all remaining repairs and painting and project close-out is anticipated in early FY 2025-2026.

Projects Closed Out in FY 2024-2025
(CIP 301-637, Budget $2,690,000) Road Widening - Foster City Boulevard and Chess Drive – Multi- Project #4, #7, and #8 (2013-2014)
The project was intended to address improvements at the intersection of Foster City Boulevard and Chess Drive. The improvements included adding a northbound right-turn lane on Foster City Boulevard at Chess Drive; lengthening the westbound left turn lane on Chess Drive at Foster City Boulevard; and adding a westbound lane on Chess Drive east of Foster City Boulevard.

These Improvements were funded by the Chess Hatch development based on the traffic impacts of the future building. The Chess Hatch Development Agreement (DA) expired at the end of 2023. As a result, the building will not be constructed and the associated traffic improvements required to mitigate its impacts are no longer necessary. The funds for the traffic improvements were returned to the developer and the project was closed out. Should another development be proposed at the same location, traffic impacts will be studied and fees collected to fund the improvements required to mitigate it’s impacts.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

21 (CIP 455-696, Budget $900,000) Sanitary Sewer System Improvements (2020-2021) The scope of the project includes the replacement relocation, and new installation of sanitary sewer pipelines and manholes at three (3) locations on Argus, Regulus, and Polaris Avenue. The work was bid as options in the completed CIP 455-611 Sanitary Sewer System Improvements Project; however, the options were not exercised due to budgetary constraints. On January 4, 2021, the EMID Board of Directors adopted Resolution No. 3553 authorizing an agreement with HydroScience Engineers, Inc. to prepare construction contract documents and provide construction support services for these 3 locations.

The construction contract documents are 90 percent complete.

Improvements made as a part of CIP 611 (which replaced upstream pipelines) appear to have effectively resolved the previously existing issues that were affecting the downstream lift station. It was determined that maintenance will monitor the lift station, and funds that would have been spent on construction be applied to higher priority wastewater projects. The location continues to be monitored by Wastewater maintenance staff and the project has been moved into the 15-year CIP. A small design contract would be required the year that this work is to be performed to finalize the drawings and make any modifications. (CIP 301-702, Budget $300,000) Park Pathway Restoration (2021-2022) This project addressed improvements to pathways in the following city parks: Arcturus, Turnstone, Shad, Erckenbrack, and Constitution Walkway. Improvements included removing and replacing failed and root- damaged asphalt and installing root barrier, slurry seal, and, if needed, line striping. Construction has been completed and the Notice of Completion was accepted by the City Council on July 15, 2024. (CIP 301-703, Budget $3,200,000) Street Rehabilitation (2021-2022) This project consisted of the repair/resurfacing of the following public streets: Polaris Avenue, Argus Court, Arcturus Court, Pollux Court, portions of Shell Boulevard, Comet Drive, Balclutha Drive, Polynesia Avenue, Constitution Drive, Chrysopolis Drive, Lurline Drive, Niantic Drive, and Pilgrim Drive. Repair methods included crack seal, slurry seal, dig-out repairs, and surface overlays. The project also included curb and gutter replacement and sidewalk repairs on the streets that are being repaired. Sharrow symbols/legends were incorporated as appropriate. Construction of the Park Pathway Restoration Project (CIP 301-702) was performed in conjunction with this project to take advantage of economies of scale and allow more efficient project delivery. Construction has been completed and Notice of Completion was accepted by the City Council on July 15, 2024.
(CIP 301-712, Budget $1,250,000) Edgewater Park Softball and Soccer Synthetic Turf Resurfacing (2023-2024)
The project addressed the full replacement of the turf surface of the Edgewater Park softball/soccer field.

A construction contract was awarded to Shaw Integrated and Turf Solutions on May 20, 2024, Construction began in July 2024 and was substantially completed by September 2024, with final Completion in November 2024. The remaining item on this project consists of a final field walk with the design consultant in July 2025 to confirm the field is meeting intended performance characteristics nine months after installation.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

22 THE CAPITAL IMPROVEMENT PROJECT BUDGETING PROCESS
As part of the City’s Annual Budget and Five Year Financial Plan process, the City prepares a Five Year Capital Improvement Project Program. A Capital Improvement Program consisting of several Capital Improvement Projects (CIP) is a plan for capital expenditures to provide for the acquisition, expansion or rehabilitation of an element of the City's physical plant to be incurred over a fixed period of several future years. Examples of such projects include:
• Street pavement projects
• City facilities construction / refurbishment
• Park infrastructure improvements (e.g., paving sport courts, constructing or maintaining walkways, or rehabilitation of park facilities)
• Water valve or pipe replacement
• Sewer Lift Station refurbishment
Because the costs of such improvements are usually significant, the Five-Year Capital Improvement Project Program is a useful tool for anticipating and planning for future costs and developing funding strategies for projects.

CIP Planning Process
Identifying CIP Projects
Throughout the fiscal year, City staff members monitor the functional status and performance of the City’s infrastructure elements. Maintenance activities are documented and analyzed to determine if rehabilitation or replacement is necessary. In addition, the City Council may provide policy direction to construct, enhance or rehabilitate City facilities. Based on these inputs, Staff begins to define the scope, nature and extent of projects. Projects on the previous year’s Five-Year CIP Plan are reviewed and updated and new recommended projects are defined.

Cost Estimates
Upon identifying the scope and nature of each project, staff prepares cost estimates of the projects.

Projects which come up within the next 1-2 years have detailed engineers’ cost estimates prepared.

Projects which are 3-5 years out have less detailed cost estimates, but are sufficient in detail to give an overall order-of-magnitude cost estimate for planning purposes.

The cost estimates include an inflationary factor in a range of 2% to 10% per year for projects that are in years 2-5 based upon the historical trends and future expectations of raw materials and labor costs for projects. Cost estimates also include contingency factors that can range from 10% to 25% based upon the historical experience of similar projects and the relative uncertainty with respect to the project itself.

For example, a construction project built upon ground that is suspected to have hazardous materials may yield a higher contingency factor than a relatively simple replacement of walkways.

Funding Sources
Once the costs and timing have been identified and projected, a financial analysis is prepared to determine whether the projects can be funded. Consideration is given to a variety of sources of funds including:
• Grant funds
• Revenues dedicated for such purposes (e.g., Measure A funds for street improvements) • Park In-lieu fees
• Water and Wastewater rate revenue
• Interest earnings
• Existing undesignated funds

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

23 Development of Five-Year Plan
The recommended timing of projects in the plan takes into consideration many factors including:
• Status of the existing infrastructure
• Risk management considerations
• City Council policy priorities
• Staffing/staff workload
• Bidding environment
• Available funding
The City Council considers the draft plan at a Study Session that is typically held in late March. The City Council provides direction on each of the projects and any changes are incorporated into a revised plan that is reviewed by the Planning Commission for consistency with the General Plan. Any updates requiring further discussion are provided once again to the City Council at a Budget Study Session, typically held in May.

The City Council then holds a Public Hearing on the budget as a whole, which includes the Five-Year CIP Plan, normally in June. Subject to any public testimony and final Council direction, the final Five-Year CIP Plan is prepared, and the project costs associated with any projects which are funded in the next fiscal year are appropriated by the City Council as part of the adoption of the Annual Budget.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

24 FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30) Category

PROJECT
# PROJECT NAME
Funding
Source* TOTAL 2025-26 2026-27 2027-28 2028-29 2029-30

BUILDING PROJECTS
C BD-01 BD-01 (CIP 301-677) LIBRARY EXTERIOR IMPROVEMENTS AND RE-LANDSCAPING (FY 2017-2018) CC $200,000 $0 $200,000 $0 $0 $0 B BD-02 BD-02 (NEW CIP) INSTALL ELECTRIC VEHICLE CHARGING STATIONS (FY 2025-2026) CC $1,600,000 $1,000,000 $100,000 $500,000 $0 $0 B BD-03 BD-03 (NEW CIP) CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (FY 2027-2028) CC/CW/CWW $2,000,000 $0 $0 $2,000,000 $0 $0 B BD-04 BD-04 (NEW CIP) REPLACE CITY HALL AND FIRE STATION ROOF (FY 2027-2028) BMF $500,000 $0 $0 $500,000 $0 $0 B BD-05 BD-05 (NEW CIP) REPLACE COUNCIL CHAMBERS HVAC (FY 2028-2029) BMF $500,000 $0 $0 $0 $500,000 $0 TOTAL BUILDING PROJECTS 5 $4,800,000 $1,000,000 $300,000 $3,000,000 $500,000 $0

PARKS PROJECTS
A PK-01 PK-01 (CIP 301-678) RECREATION CENTER REBUILD (FY 2017-2018) PIF $467,000 $467,000 $0 $0 $0 $0 B PK-02 PK-02 (CIP 301-714) SEA CLOUD MAINTENANCE SHED (FY 2023-2024) CC $2,000,000 $0 $2,000,000 $0 $0 $0 C PK-03 PK-03 (NEW CIP) TENNIS AND BASKETBALL COURTS RESURFACING (FY 2026-2027) CC $320,000 $0 $320,000 $0 $0 $0 B PK-04 PK-04 (NEW CIP) PASSIVE TURF REMOVAL AND LANDSCAPE ENHANCEMENT (FY 2026-2027) CC $1,100,000 $0 $1,100,000 $0 $0 $0 B PK-05 PK-05 (NEW CIP) CATAMARAN AND SEA CLOUD S3 SYTHETIC RESURFACING (FY 2026-2027) CC $1,800,000 $0 $1,800,000 $0 $0 $0 C PK-06 PK-06 (NEW CIP) AMPHITHEATER SYNTHETIC TURF RESURFACING (FY 2026-2027) CC $120,000 $0 $120,000 $0 $0 $0 B PK-07 PK-07 (NEW CIP) PARK PATHWAY REHABILITATION (FY 2027-2028) CC $600,000 $0 $0 $600,000 $0 $0 B PK-08 PK-08 (NEW CIP) DOG PARK INFRASTRUCTURE UPGRADE AND SYNTHETIC TURF REPLACEMENT (FY 2027-2028) CC $500,000 $0 $0 $500,000 $0 $0
C PK-09 PK-09 (NEW CIP) PARKING LOT RESURFACING (FY 2028-2029) CC $600,000 $0 $0 $0 $600,000 $0 B PK-10 PK-10 (NEW CIP) PORT ROYAL SYNTHETIC TURF RESURFACING (FY 2028-2029) CC $925,000 $0 $0 $0 $925,000 $0 B PK-11 PK-11 (NEW CIP) SEA CLOUD S1, S2, B1 SYNTHETIC RESURFACING (FY 2029-2030) CC $1,300,000 $0 $0 $0 $0 $1,300,000 C PK-12 PK-12 (NEW CIP) PLACEHOLDER PENDING PARK SYSTEM MASTER PLAN (FY 2027-2028) CC/ERF/PIL $19,001,000 $0 $0 $8,760,000 $3,500,000 $6,741,000 TOTAL PARKS PROJECTS 12 $28,733,000 $467,000 $5,340,000 $9,860,000 $5,025,000 $8,041,000

STORMWATER/LAGOON PROJECTS
A SW-01 SW-01 (CIP 301-717) LAGOON PUMP STATION REHABILITATION AND CAPACITY ENHANCEMENT (NEW NAME) (FY 2023-2024) CC $15,250,000 $6,950,000 $4,000,000 $4,300,000 $0 $0 A SW-02 SW-02 (CIP 301-721) LAGOON INTAKE STRUCTURE REHABILITATION (FY 2024-2025) CC $750,000 $50,000 $700,000 $0 $0 $0 TOTAL STORMWATER/LAGOON PROJECTS 2 $16,000,000 $7,000,000 $4,700,000 $4,300,000 $0 $0

STREETS/TRAFFIC PROJECTS
A ST-01 ST-01 (CIP 301-698) TRAFFIC SIGNAL SYSTEM UPGRADES (FY 2020-2021) CC/ERF/MA/ MM/MW/SB1/TIF $7,825,000 $0 $4,825,000 $3,000,000 $0 $0 A ST-02 ST-02 (NEW CIP) STREET REHABILITATION (FY 2025-2026) GT/SB1 $2,000,000 $2,000,000 $0 $0 $0 $0 B ST-03 ST-03 (NEW CIP) FIRE AND RESCUE BOAT RAMP REHABILITATION (FY 2026-2027) CC $280,000 $0 $80,000 $0 $200,000 $0 C ST-04 ST-04 (NEW CIP) BICYCLE AND PEDESTRIAN IMPROVEMENTS (FY 2026-2027) SB1 $325,000 $0 $325,000 $0 $0 $0 A ST-05 ST-05 (NEW CIP) STREET REHABILITATION (FY 2026-2027) GT/MA/SB1 $2,000,000 $0 $2,000,000 $0 $0 $0 A ST-06 ST-06 (NEW CIP) STREET REHABILITATION (FY 2027-2028) GT/MA/SB1 $2,000,000 $0 $0 $2,000,000 $0 $0 A ST-07 ST-07 (NEW CIP) STREET REHABILITATION (FY 2028-2029) GT/MA/SB1 $2,000,000 $0 $0 $0 $2,000,000 $0 A ST-08 ST-08 (NEW CIP) STREET REHABILITATION (FY 2029-2030) GT/MA/SB1 $2,000,000 $0 $0 $0 $0 $2,000,000 TOTAL STREETS/TRAFFIC PROJECTS 8 $18,430,000 $2,000,000 $7,230,000 $5,000,000 $2,200,000 $2,000,000 (Continued to next page)

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

25 (Continued from last page)
FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30) Category

PROJECT
# PROJECT NAME
Funding
Source* TOTAL 2025-26 2026-27 2027-28 2028-29 2029-30

WATER PROJECTS
A WA-01 WA-01 (CIP 405-723) WATER MAIN CONDITION ASSESSMENT (FY 2024-2025) CW $500,000 $500,000 $0 $0 $0 $0 A WA-02 WA-02 (NEW CIP) PERMANENT EMERGENCY BYPASS TRANSMISSION MAIN ON E. THIRD AVE. (FY 2025-2026) CW $1,000,000 $300,000 $700,000 $0 $0 $0 A WA-03 WA-03 (NEW CIP) WATER TANK LINING AND STRUCTURAL RETROFIT (FY 2026-2027) CW $6,000,000 $0 $750,000 $5,250,000 $0 $0 B WA-04 WA-04 (NEW CIP) LARGE WATER VALVE REPLACEMENT (FY 2026-2027) CW $1,500,000 $0 $1,000,000 $500,000 $0 $0 B WA-05 WA-05 (NEW CIP) COATING ON 24-INCH TRANSMISSION MAIN AT SEAL SLOUGH BRIDGE (FY 2026-2027) CW/WCF $1,000,000 $0 $1,000,000 $0 $0 $0 A WA-06 WA-06 (NEW CIP) ASSESSMENT OF CATHODIC PROTECTION ANODE BEDS (FY 2027-2028) CW $500,000 $0 $0 $500,000 $0 $0 A WA-07 WA-07 (NEW CIP) WATER FACILITIES SEISMIC VULNERABILITY ASSESSMENT (FY 2027-2028) CW $125,000 $0 $0 $125,000 $0 $0 A WA-08
WA-08 (NEW CIP) TWO ENGINES AND PUMP REPLACEMENT AT WATER BOOSTER PUMP STATION (FY 2027-2028) CW $975,000 $0 $0 $375,000 $600,000 $0
A WA-09 WA-09 (NEW CIP) CHLORINE ANALYZERS AND AUTOFLUSHERS AT VARIOUS LOCATIONS (FY 2028-2029) CW $700,000 $0 $0 $0 $700,000 $0 B WA-10 WA-10 (NEW CIP) EAST HILLSDALE BOULEVARD LOOP (FY 2028-2029) CW $138,000 $0 $0 $0 $138,000 $0 B WA-11 WA-11 (NEW CIP) LARGE WATER VALVE REPLACEMENT (FY 2029-2030) CW $1,000,000 $0 $0 $0 $0 $1,000,000 TOTAL WATER PROJECTS 11 $13,438,000 $800,000 $3,450,000 $6,750,000 $1,438,000 $1,000,000

WASTEWATER PROJECTS
A WW-01 WW-01 (CIP 455-652) WASTEWATER TREATMENT PLANT MASTER PLAN IMPROVEMENTS (FY 2015-2016) CWW $11,317,319 $9,959,516 $1,357,803 $0 $0 $0 A WW-02 WW-02 (CIP 455-705) EMERGENCY GENERATOR REPLACEMENTS (FY 2021-2022) CWW $2,000,000 $2,000,000 $0 $0 $0 $0 A WW-03 WW-03 (CIP 455-710) SHELL BRIDGE SANITARY SEWER FORCE MAIN REHABILITATION (FY 2022-2023) CWW $500,000 $500,000 $0 $0 $0 $0 A WW-04 WW-04 (CIP 455-719) SANITARY SEWER LIFT STATION IMPROVEMENTS - PHASE 6 (FY 2023-2024) CWW $8,900,000 $7,900,000 $1,000,000 $0 $0 $0 A WW-05 WW-05 (NEW CIP) SANITARY SEWER MANHOLE REPLACEMENTS (FY 2026-2027) CWW $2,500,000 $0 $500,000 $2,000,000 $0 $0 B WW-06 WW-06 (NEW CIP) OVERFLOW, REDUNDANCY, BYPASSING AND BACKUP POWER STUDY (FY 2027-2028) CWW $1,100,000 $0 $0 $100,000 $1,000,000 $0 B WW-07 WW-07 (NEW CIP) WASTEWATER MASTER PLAN (FY 2028-2029) CWW $600,000 $0 $0 $0 $600,000 $0 A WW-08 WW-08 (NEW CIP) SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE 7 (FY 2028-2029) CWW $6,200,000 $0 $0 $0 $3,200,000 $3,000,000 TOTAL WASTEWATER COLLECTION SYSTEM PROJECTS 8 $33,117,319 $20,359,516 $2,857,803 $2,100,000 $4,800,000 $3,000,000 GRAND TOTAL 46 $114,518,319 $31,626,516 $23,877,803 $31,010,000 $13,963,000 $14,041,000 *BMF=Building Maintenance Fund; CC=CIP City; CW=CIP Water; CWW=CIP Wastewater; CWW-ERF= Wastewater Equipment Replacement Fund; ERF=Equipment Replacement Fund; GT=Gas Tax (2103); MA=Measure A; MM=Measure M; MW=Measure W; SB 1 = Road Maintenance & Rehab; PIF = Park Facility Impact Fees; PIL = Park-In-Lieu; TIF = Transportation Impact Fees; WCF=Water Connection Fees; WWCF=Wastewater Connection Fees

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

26 TABLE A
FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30) Project No. PROJECT DESCRIPTION TOTAL

CATEGORY A PROJECTS
PK-01 PK-01 (CIP 301-678) RECREATION CENTER REBUILD (FY 2017-2018) $ 467,000 ST-01 ST-01 (CIP 301-698) TRAFFIC SIGNAL SYSTEM UPGRADES (FY 2020-2021) $ 7,825,000 ST-02 ST-02 (NEW CIP) STREET REHABILITATION (FY 2025-2026) $ 2,000,000 ST-05 ST-05 (NEW CIP) STREET REHABILITATION (FY 2026-2027) $ 2,000,000 ST-06 ST-06 (NEW CIP) STREET REHABILITATION (FY 2027-2028) $ 2,000,000 ST-07 ST-07 (NEW CIP) STREET REHABILITATION (FY 2028-2029) $ 2,000,000 ST-08 ST-08 (NEW CIP) STREET REHABILITATION (FY 2029-2030) $ 2,000,000 SW-01
SW-01 (CIP 301-717) LAGOON PUMP STATION REHABILITATION AND CAPACITY ENHANCEMENT (NEW NAME) (FY 2023-2024) $ 15,250,000
SW-02 SW-02 (CIP 301-721) LAGOON INTAKE STRUCTURE REHABILITATION (FY 2024-2025) $ 750,000 WA-01 WA-01 (CIP 405-723) WATER MAIN CONDITION ASSESSMENT (FY 2024-2025) $ 500,000 WA-02 WA-02 (NEW CIP) PERMANENT EMERGENCY BYPASS TRANSMISSION MAIN ON E. THIRD AVE. (FY 2025-2026) $ 1,000,000 WA-03 WA-03 (NEW CIP) WATER TANK LINING AND STRUCTURAL RETROFIT (FY 2026-2027) $ 6,000,000 WA-06 WA-06 (NEW CIP) ASSESSMENT OF CATHODIC PROTECTION ANODE BEDS (FY 2027-2028) $ 500,000 WA-07 WA-07 (NEW CIP) WATER FACILITIES SEISMIC VULNERABILITY ASSESSMENT (FY 2027-2028) $ 125,000 WA-08 WA-08 (NEW CIP) TWO ENGINES AND PUMP REPLACEMENT AT WATER BOOSTER PUMP STATION (FY 2027-2028) $ 975,000 WA-09 WA-09 (NEW CIP) CHLORINE ANALYZERS AND AUTOFLUSHERS AT VARIOUS LOCATIONS (FY 2028-2029) $ 700,000 WW-01 WW-01 (CIP 455-652) WASTEWATER TREATMENT PLANT MASTER PLAN IMPROVEMENTS (FY 2015-2016) $ 11,317,319 WW-02 WW-02 (CIP 455-705) EMERGENCY GENERATOR REPLACEMENTS (FY 2021-2022) $ 2,000,000 WW-03 WW-03 (CIP 455-710) SHELL BRIDGE SANITARY SEWER FORCE MAIN REHABILITATION (FY 2022-2023) $ 500,000 WW-04 WW-04 (CIP 455-719) SANITARY SEWER LIFT STATION IMPROVEMENTS - PHASE 6 (FY 2023-2024) $ 8,900,000 WW-05 WW-05 (NEW CIP) SANITARY SEWER MANHOLE REPLACEMENTS (FY 2026-2027) $ 2,500,000 WW-08 WW-08 (NEW CIP) SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE 7 (FY 2028-2029) $ 6,200,000 Subtotal for Category A Projects $ 75,509,319
(Continued on next page)

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

27 (Continued from previous page)

TABLE A
FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30) Project No. PROJECT DESCRIPTION TOTAL

CATEGORY B PROJECTS
BD-02 BD-02 (NEW CIP) INSTALL ELECTRIC VEHICLE CHARGING STATIONS (FY 2025-2026) $ 1,600,000 BD-03 BD-03 (NEW CIP) CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (FY 2027-2028) $ 2,000,000 BD-04 BD-04 (NEW CIP) REPLACE CITY HALL AND FIRE STATION ROOF (FY 2027-2028) $ 500,000 BD-05 BD-05 (NEW CIP) REPLACE COUNCIL CHAMBERS HVAC (FY 2028-2029) $ 500,000 PK-02 PK-02 (CIP 301-714) SEA CLOUD MAINTENANCE SHED (FY 2023-2024) $ 2,000,000 PK-04 PK-04 (NEW CIP) PASSIVE TURF REMOVAL AND LANDSCAPE ENHANCEMENT (FY 2026-2027) $ 1,100,000 PK-05 PK-05 (NEW CIP) CATAMARAN AND SEA CLOUD S3 SYTHETIC RESURFACING (FY 2026-2027) $ 1,800,000 PK-07 PK-07 (NEW CIP) PARK PATHWAY REHABILITATION (FY 2027-2028) $ 600,000 PK-08 PK-08 (NEW CIP) DOG PARK INFRASTRUCTURE UPGRADE AND SYNTHETIC TURF REPLACEMENT (FY 2027-2028) $ 500,000 PK-10 PK-10 (NEW CIP) PORT ROYAL SYNTHETIC TURF RESURFACING (FY 2028-2029) $ 925,000 PK-11 PK-11 (NEW CIP) SEA CLOUD S1, S2, B1 SYNTHETIC RESURFACING (FY 2029-2030) $ 1,300,000 ST-03 ST-03 (NEW CIP) FIRE AND RESCUE BOAT RAMP REHABILITATION (FY 2026-2027) $ 280,000 WA-04 WA-04 (NEW CIP) LARGE WATER VALVE REPLACEMENT (FY 2026-2027) $ 1,500,000 WA-05 WA-05 (NEW CIP) COATING ON 24-INCH TRANSMISSION MAIN AT SEAL SLOUGH BRIDGE (FY 2026-2027) $ 1,000,000 WA-10 WA-10 (NEW CIP) EAST HILLSDALE BOULEVARD LOOP (FY 2028-2029) $ 138,000 WA-11 WA-11 (NEW CIP) LARGE WATER VALVE REPLACEMENT (FY 2029-2030) $ 1,000,000 WW-06 WW-06 (NEW CIP) OVERFLOW, REDUNDANCY, BYPASSING AND BACKUP POWER STUDY (FY 2027-2028) $ 1,100,000 WW-07 WW-07 (NEW CIP) WASTEWATER MASTER PLAN (FY 2028-2029) $ 600,000 Subtotal for Category B Projects $ 18,443,000

CATEGORY C PROJECTS
BD-01 BD-01 (CIP 301-677) LIBRARY EXTERIOR IMPROVEMENTS AND RE-LANDSCAPING (FY 2017-2018) $ 200,000 PK-03 PK-03 (NEW CIP) TENNIS AND BASKETBALL COURTS RESURFACING (FY 2026-2027) $ 320,000 PK-06 PK-06 (NEW CIP) AMPHITHEATER SYNTHETIC TURF RESURFACING (FY 2026-2027) $ 120,000 PK-09 PK-09 (NEW CIP) PARKING LOT RESURFACING (FY 2028-2029) $ 600,000 PK-12 PK-12 (NEW CIP) PLACEHOLDER PENDING PARK SYSTEM MASTER PLAN (FY 2027-2028) $ 19,001,000 ST-04 ST-04 (NEW CIP) BICYCLE AND PEDESTRIAN IMPROVEMENTS (FY 2026-2027) $ 325,000 Subtotal for Category C Projects $ 20,566,000
GRAND TOTAL $ 114,518,319

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

28 TABLE B
FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30)

DESCRIPTION
CIP City
(Fund 301)

CAP ASSET
ACQ &
REPL
(Fund 326)

ISF-ERF
(Fund 502)

ISF-BMF
(Fund 505)
Developer
Deposits
(4)
Measure A
(Fund 102)
Gas Tax
2103
(Fund 103)
Park-In-
Lieu Fees
(Fund 104)
Measure M
(Fund 105)
SB1 Road
Maint and
Rehab
(Fund 119)
Measure W
(Fund 136)
Impact Fees
- Park
Facility
(Fund 142)
Impact Fees -
Transportation
(Fund 144)
Water CIP
(Fund 405)
Water
Connection
(Fund 409)
Wastewtr CIP
(Fund 455)
Wastewtr
ERF
(Fund 458)
Wastewater
Connection
Fees
(Fund 460) TOTAL
301 304 502 505 102 103 104 105 119 136 230 405 409 455 458 460 Est. Funds Available for CIP Projects, 6/30/2025
(1) $25,445,751 $5,840,691 $7,701,467 $8,625,587 $1,525,321 $2,624,362 $617,910 $2,396,715 $124,100 $1,512,925 $381,449 $584,798 $199,340 $5,300,028 $159,709 $18,489,628 $2,721,847 $375,545 $84,627,173 Long-Term CIP Funding Program (2) $28,750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,950,000 $0 $30,000,000 $0 $0 $70,700,000 Revenue Projections (3) $0 $0 $0 $0 $0 $4,975,100 $1,611,554 $0 $658,700 $4,883,612 $2,492,400 $5,334,706 $1,050,650 $0 $522,750 $0 $0 $2,228,201 $23,757,673 Total Available $54,195,751 $5,840,691 $7,701,467 $8,625,587 $1,525,321 $7,599,462 $2,229,464 $2,396,715 $782,800 $6,396,537 $2,873,849 $5,919,504 $1,249,990 $17,250,028 $682,459 $48,489,628 $2,721,847 $2,603,746 $179,084,846

CATEGORY A PROJECTS
PK-01 (CIP 301-678) RECREATION CENTER
REBUILD (FY 2017-2018) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $467,000 $0 $0 $0 $0 $0 $0 $467,000 ST-01 (CIP 301-698) TRAFFIC SIGNAL SYSTEM
UPGRADES (FY 2020-2021) $2,430,000 $0 $480,000 $0 $0 $2,740,000 $0 $0 $380,000 $0 $1,300,000 $0 $495,000 $0 $0 $0 $0 $0 $7,825,000 ST-02 (NEW CIP) STREET REHABILITATION (FY
2025-2026) $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 ST-05 (NEW CIP) STREET REHABILITATION (FY
2026-2027) $0 $0 $0 $0 $0 $1,010,000 $425,000 $0 $0 $565,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 ST-06 (NEW CIP) STREET REHABILITATION (FY
2027-2028) $0 $0 $0 $0 $0 $740,000 $310,000 $0 $0 $950,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 ST-07 (NEW CIP) STREET REHABILITATION (FY
2028-2029) $0 $0 $0 $0 $0 $725,000 $325,000 $0 $0 $950,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 ST-08 (NEW CIP) STREET REHABILITATION (FY
2029-2030) $0 $0 $0 $0 $0 $700,000 $300,000 $0 $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 SW-01 (CIP 301-717) LAGOON PUMP STATION

REHABILITATION AND CAPACITY

ENHANCEMENT
(NEW NAME) (FY 2023-2024) $15,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $15,250,000 SW-02 (CIP 301-721) LAGOON INTAKE
STRUCTURE REHABILITATION (FY 2024-2025) $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 WA-01 (CIP 405-723) WATER MAIN CONDITION
ASSESSMENT (FY 2024-2025) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $500,000 WA-02 (NEW CIP) PERMANENT EMERGENCY
BYPASS TRANSMISSION MAIN ON E. THIRD
AVE. (FY 2025-2026) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 $1,000,000 WA-03 (NEW CIP) WATER TANK LINING AND
STRUCTURAL RETROFIT (FY 2026-2027) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $0 $0 $0 $6,000,000 WA-06 (NEW CIP) ASSESSMENT OF CATHODIC
PROTECTION ANODE BEDS (FY 2027-2028) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $500,000 WA-07 (NEW CIP) WATER FACILITIES SEISMIC
VULNERABILITY ASSESSMENT (FY 2027-2028) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $125,000 $0 $0 $0 $0 $125,000 WA-08 (NEW CIP) TWO ENGINES AND PUMP

REPLACEMENT AT WATER BOOSTER PUMP
STATION (FY 2027-2028) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $975,000 $0 $0 $0 $0 $975,000 WA-09 (NEW CIP) CHLORINE ANALYZERS AND

AUTOFLUSHERS AT VARIOUS LOCATIONS (FY
2028-2029) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $700,000 $0 $0 $0 $0 $700,000 (Continued to next page)
(Continued from previous page)

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

29 TABLE B
FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30)

DESCRIPTION
CIP City
(Fund 301)

CAP ASSET
ACQ &
REPL
(Fund 326)

ISF-ERF
(Fund 502)

ISF-BMF
(Fund 505)
Developer
Deposits
(4)
Measure A
(Fund 102)
Gas Tax
2103
(Fund 103)
Park-In-
Lieu Fees
(Fund 104)
Measure M
(Fund 105)
SB1 Road
Maint and
Rehab
(Fund 119)
Measure W
(Fund 136)
Impact Fees
- Park
Facility
(Fund 142)
Impact Fees -
Transportation
(Fund 144)
Water CIP
(Fund 405)
Water
Connection
(Fund 409)
Wastewtr CIP
(Fund 455)
Wastewtr
ERF
(Fund 458)
Wastewater
Connection
Fees
(Fund 460) TOTAL
CATEGORY A PROJECTS (continued)
WW-01 (CIP 455-652) WASTEWATER

TREATMENT PLANT MASTER PLAN
IMPROVEMENTS (FY 2015-2016) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,317,319 $0 $0 $11,317,319 WW-02 (CIP 455-705) EMERGENCY
GENERATOR REPLACEMENTS (FY 2021-2022) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $0 $0 $2,000,000 WW-03 (CIP 455-710) SHELL BRIDGE SANITARY

SEWER FORCE MAIN REHABILITATION (FY
2022-2023) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $0 $500,000 WW-04 (CIP 455-719) SANITARY SEWER LIFT
STATION IMPROVEMENTS - PHASE 6 (FY
2023-2024) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,900,000 $0 $0 $8,900,000 WW-05 (NEW CIP) SANITARY SEWER
MANHOLE REPLACEMENTS (FY 2026-2027) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $0 $0 $2,500,000 WW-08 (NEW CIP) SANITARY SEWER LIFT
STATIONS IMPROVEMENTS - PHASE 7 (FY
2028-2029) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,200,000 $0 $0 $6,200,000 SUB TOTAL OF CATEGORY A PROJECTS $18,430,000 $0 $480,000 $0 $0 $5,915,000 $1,860,000 $0 $380,000 $4,965,000 $1,300,000 $467,000 $495,000 $9,800,000 $0 $31,417,319 $0 $0 $75,509,319 FUNDS AVAIL. (LESS CATEGORY A
PROJECTS) $35,765,751 $5,840,691 $7,221,467 $8,625,587 $1,525,321 $1,684,462 $369,464 $2,396,715 $402,800 $1,431,537 $1,573,849 $5,452,504 $754,990 $7,450,028 $682,459 $17,072,309 $2,721,847 $2,603,746 $103,575,527

CATEGORY B PROJECTS
BD-02 (NEW CIP) INSTALL ELECTRIC VEHICLE
CHARGING STATIONS (FY 2025-2026) $1,600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,600,000 BD-03 (NEW CIP) CORPORATION YARD FENCE

REPLACEMENT/REHABILITATION (FY
2027-2028) $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $0 $500,000 $0 $0 $2,000,000 BD-04 (NEW CIP) REPLACE CITY HALL AND
FIRE STATION ROOF (FY 2027-2028) $0 $0 $0 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 BD-05 (NEW CIP) REPLACE COUNCIL
CHAMBERS HVAC (FY 2028-2029) $0 $0 $0 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 PK-02 (CIP 301-714) SEA CLOUD
MAINTENANCE SHED (FY 2023-2024) $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 PK-04 (NEW CIP) PASSIVE TURF REMOVAL

AND LANDSCAPE ENHANCEMENT (FY
2026-2027) $1,100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,100,000 PK-05 (NEW CIP) CATAMARAN AND SEA
CLOUD S3 SYTHETIC RESURFACING (FY
2026-2027) $1,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,800,000 PK-07 (NEW CIP) PARK PATHWAY
REHABILITATION (FY 2027-2028) $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 PK-08 (NEW CIP) DOG PARK

INFRASTRUCTURE UPGRADE AND SYNTHETIC
TURF REPLACEMENT (FY 2027-2028) $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 PK-10 (NEW CIP) PORT ROYAL SYNTHETIC
TURF RESURFACING (FY 2028-2029) $925,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $925,000 PK-11 (NEW CIP) SEA CLOUD S1, S2, B1
SYNTHETIC RESURFACING (FY 2029-2030) $1,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,300,000 ST-03 (NEW CIP) FIRE AND RESCUE BOAT
RAMP REHABILITATION (FY 2026-2027) $280,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $280,000 (Continued on next page)

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

30 (Continued from previous page)

TABLE B
FIVE YEAR CAPITAL IMPROVEMENT PROJECT PLAN (FISCAL YEAR 2025-26 TO 2029-30)

DESCRIPTION
CIP City
(Fund 301)

CAP ASSET
ACQ &
REPL
(Fund 326)

ISF-ERF
(Fund 502)

ISF-BMF
(Fund 505)
Developer
Deposits
(4)
Measure A
(Fund 102)
Gas Tax
2103
(Fund 103)
Park-In-
Lieu Fees
(Fund 104)
Measure M
(Fund 105)
SB1 Road
Maint and
Rehab
(Fund 119)
Measure W
(Fund 136)
Impact Fees
- Park
Facility
(Fund 142)
Impact Fees -
Transportation
(Fund 144)
Water CIP
(Fund 405)
Water
Connection
(Fund 409)
Wastewtr CIP
(Fund 455)
Wastewtr
ERF
(Fund 458)
Wastewater
Connection
Fees
(Fund 460) TOTAL
WA-04 (NEW CIP) LARGE WATER VALVE
REPLACEMENT (FY 2026-2027) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,500,000 $0 $0 $0 $0 $1,500,000 WA-05 (NEW CIP) COATING ON 24-INCH

TRANSMISSION MAIN AT SEAL SLOUGH
BRIDGE (FY 2026-2027) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $1,000,000 WA-10 (NEW CIP) EAST HILLSDALE
BOULEVARD LOOP (FY 2028-2029) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $138,000 $0 $0 $0 $0 $0 $138,000 WA-11 (NEW CIP) LARGE WATER VALVE
REPLACEMENT (FY 2029-2030) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 $0 $1,000,000 WW-06 (NEW CIP) OVERFLOW, REDUNDANCY,

BYPASSING AND BACKUP POWER STUDY (FY
2027-2028) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,100,000 $0 $0 $0 $1,100,000 WW-07 (NEW CIP) WASTEWATER MASTER
PLAN (FY 2028-2029) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $0 $0 $0 $600,000 SUB TOTAL OF CATEGORY B PROJECTS $11,105,000 $0 $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,638,000 $500,000 $2,200,000 $0 $0 $18,443,000 FUNDS AVAIL. (LESS CATEGORY A AND B
PROJECTS) $24,660,751 $5,840,691 $7,221,467 $7,625,587 $1,525,321 $1,684,462 $369,464 $2,396,715 $402,800 $1,431,537 $1,573,849 $5,452,504 $754,990 $3,812,028 $182,459 $14,872,309 $2,721,847 $2,603,746 $85,132,527

CATEGORY C PROJECTS
BD-01 (CIP 301-677) LIBRARY EXTERIOR

IMPROVEMENTS AND RE-LANDSCAPING (FY
2017-2018) $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 PK-03 (NEW CIP) TENNIS AND BASKETBALL
COURTS RESURFACING (FY 2026-2027) $320,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $320,000 PK-06 (NEW CIP) AMPHITHEATER SYNTHETIC
TURF RESURFACING (FY 2026-2027) $120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $120,000 PK-09 (NEW CIP) PARKING LOT RESURFACING
(FY 2028-2029) $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 PK-12 (NEW CIP) PLACEHOLDER PENDING
PARK SYSTEM MASTER PLAN (FY 2027-2028) $16,021,000 $0 $930,000 $0 $0 $0 $0 $2,050,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $19,001,000 ST-04 (NEW CIP) BICYCLE AND PEDESTRIAN
IMPROVEMENTS (FY 2026-2027) $0 $0 $0 $0 $0 $0 $0 $0 $0 $325,000 $0 $0 $0 $0 $0 $0 $0 $0 $325,000

SUB TOTAL OF CATEGORY C
PROJECTS $17,261,000 $0 $930,000 $0 $0 $0 $0 $2,050,000 $0 $325,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,566,000 FUNDS AVAIL. (LESS CATEGORY A,
B, AND C PROJECTS) $7,399,751 $5,840,691 $6,291,467 $7,625,587 $1,525,321 $1,684,462 $369,464 $346,715 $402,800 $1,106,537 $1,573,849 $5,452,504 $754,990 $3,812,028 $182,459 $14,872,309 $2,721,847 $2,603,746 $64,566,527 (1) Funds Available are based upon a December 31, 2024 financial review and also include $2.0M Emergency Reserve for CIP Water and CIP Wastewater. (2) Funds transferred from the City General Fund (for CIP - City), Water Operations (CIP Water) and Wastewater Operations (CIP Wastewater) over the next five years per the Long-Term CIP Funding Program. (3) Revenue projections based on a preliminary projection of revenues in preparation of the 5-Year Financial Plan forecast. (4) Funds represent the deposits made by the developers of the following projects: Gilead Sciences; Chess Drive Offices; Pilgrim-Triton; 15-acre site; Biomed.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

31 TABLE C
CAPITAL IMPROVEMENT PROJECT (CIP) PLAN (FISCAL YEAR 2025-26)

PROJECT NAME
Funding
Source*
Total
Project
Cost
Prior Years'
Funding FY 2025-26
CIP City
(Fund 301)
Impact Fees -
Park Facility
(Fund 142)
Gas Tax
2103
(Fund 103)
SB1 (FUND
119)
Water CIP
(Fund 405)
Wastewtr CIP
(Fund 455)

BUILDING PROJECTS
BD-02 (NEW CIP) INSTALL ELECTRIC VEHICLE
CHARGING STATIONS (FY 2025-2026)
CC $1,000,000 $0 $1,000,000 $1,000,000 $0 $0 $0 $0 $0
TOTAL BUILDING PROJECTS 1 $1,000,000 $0 $1,000,000 $1,000,000 $0 $0 $0 $0 $0

PARKS PROJECTS
PK-01 (CIP 301-678) RECREATION CENTER
REBUILD (FY 2017-2018)
PIF $61,501,770 $61,034,770 $467,000 $0 $467,000 $0 $0 $0 $0 TOTAL PARKS PROJECTS 1 $61,501,770 $61,034,770 $467,000 $0 $467,000 $0 $0 $0 $0

STORMWATER/LAGOON PROJECTS
SW-01 (CIP 301-717) LAGOON PUMP STATION

REHABILITATION AND CAPACITY

ENHANCEMENT
(NEW NAME) (FY 2023-2024)
CC $8,950,000 $2,000,000 $6,950,000 $6,950,000 $0 $0 $0 $0 $0 SW-02 (CIP 301-721) LAGOON INTAKE
STRUCTURE REHABILITATION (FY 2024-2025)
CC $1,550,000 $1,500,000 $50,000 $50,000 $0 $0 $0 $0 $0 TOTAL STORMWATER/LAGOON PROJECTS 2 $10,500,000 $3,500,000 $7,000,000 $7,000,000 $0 $0 $0 $0 $0

STREETS/TRAFFIC PROJECTS
ST-02 (NEW CIP) STREET REHABILITATION (FY
2025-2026)
GT/SB1 $2,000,000 $0 $2,000,000 $0 $0 $500,000 $1,500,000 $0 $0 TOTAL STREETS/TRAFFIC PROJECTS 1 $2,000,000 $0 $2,000,000 $0 $0 $500,000 $1,500,000 $0 $0

WATER PROJECTS
WA-01 (CIP 405-723) WATER MAIN CONDITION
ASSESSMENT (FY 2024-2025)
WCF $750,000 $250,000 $500,000 $0 $0 $0 $0 $500,000 $0
WA-02 (NEW CIP) PERMANENT EMERGENCY
BYPASS TRANSMISSION MAIN ON E. THIRD
AVE. (FY 2025-2026)
WCF $300,000 $0 $300,000 $0 $0 $0 $0 $300,000 $0
TOTAL WATER PROJECTS 2 $1,050,000 $250,000 $800,000 $0 $0 $0 $0 $800,000 $0

WASTEWATER PROJECTS
WW-01 (CIP 455-652) WASTEWATER

TREATMENT PLANT MASTER PLAN
IMPROVEMENTS (FY 2015-2016)
CWW $172,478,998 $162,519,482 $9,959,516 $0 $0 $0 $0 $0 $9,959,516 WW-02 (CIP 455-705) EMERGENCY
GENERATOR REPLACEMENTS (FY 2021-2022)
CWW $6,200,000 $4,200,000 $2,000,000 $0 $0 $0 $0 $0 $2,000,000 WW-03 (CIP 455-710) SHELL BRIDGE

SANITARY SEWER FORCE MAIN
REHABILITATION (FY 2022-2023)
CWW $1,500,000 $1,000,000 $500,000 $0 $0 $0 $0 $0 $500,000 WW-04 (CIP 455-719) SANITARY SEWER LIFT
STATION IMPROVEMENTS - PHASE 6 (FY 2023-2024)
CWW $8,500,000 $600,000 $7,900,000 $0 $0 $0 $0 $0 $7,900,000 TOTAL WASTEWATER PROJECTS 4 $188,678,998 $168,319,482 $20,359,516 $0 $0 $0 $0 $0 $20,359,516 GRAND TOTAL 11 $264,730,768 $233,104,252 $31,626,516 $8,000,000 $467,000 $500,000 $1,500,000 $800,000 $20,359,516

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

32 TABLE D
ACTIVE AND PROPOSED CIP'S THROUGH FY 2029-30
ACTIVE

PROJECT DESCRIPTION
FY
AUTH

PRIOR YRS

BUDGET &
ADJ

CURRENT

YR BUDGET
& ADJ (FY
2024-25)
TOTAL

APPROVED

BUDGET &
ADJ 2025-26 2026-27 2027-28 2028-29 2029-30

ESTIMATED
TOTAL

PROJECT
BUDGET
301-635

MEDIAN MODIFICATIONS - FOSTER CITY BLVD AT CHESS
DRIVE - MP#3 (2013-2014, 2014-2015) 13-14 $919,169 $0 $919,169 $0 $0 $0 $0 $0 $919,169 301-637
ROAD WIDENNG-FOSTER CTY BLVD AT CHESS DRIVE-MP#7
(2013-2014, 2015-2016) 13-14 $2,690,000 $0 $2,690,000 $0 $0 $0 $0 $0 $2,690,000 455-652

WASTEWATER TREATMENT PLANT MASTER PLAN
IMPROVEMENTS (FY 2015-2016) 15-16 $154,294,219 $8,225,263 $162,519,482 $9,959,516 $1,357,803 $0 $0 $0 $173,836,801 405-660 WATER TANK IMPROVEMENTS PROJECT (2016-2017) 16-17 $5,800,000 $0 $5,800,000 $0 $0 $0 $0 $0 $5,800,000 301-677

LIBRARY EXTERIOR IMPROVEMENTS AND RE-LANDSCAPING
(2017-2018) 17-18 $120,000 $0 $120,000 $0 $200,000 $0 $0 $0 $320,000 301-678 RECREATION CENTER REBUILD PROJECT (2017-2018) 17-18 $55,432,578 $5,602,192 $61,034,770 $467,000 $0 $0 $0 $0 $61,501,770 301-682
PARK SYSTEM MASTER PLAN (fka: PARK SYSTEM
IMPROVEMENTS) (2018-2019) 18-19 $579,803 $0 $579,803 $0 $0 $0 $0 $0 $579,803 301-685 HVAC IMPROVEMENTS IN CITY BUILDINGS (2018-2019) 18-19 $2,040,000 $2,040,000 $0 $0 $0 $0 $0 $2,040,000 301-690

SEISMIC IMPROVEMENTS AT LAGOON PUMP STATION
(2019-2020) 19-20 $550,000 $550,000 $0 $0 $0 $0 $0 $550,000 455-695
LIFT STATION 59 EFFLUENT LINE IMPROVEMENTS (FY
2020-2021) 20-21 $1,800,000 $0 $1,800,000 $0 $0 $0 $0 $0 $1,800,000 455-696 SANITARY SEWER SYSTEM IMPROVEMENTS (2020-2021) 20-21 $900,000 $0 $900,000 $0 $0 $0 $0 $0 $900,000 301-698 TRAFFIC SIGNAL SYSTEM UPGRADES (FY 2020-2021) 20-21 $625,000 $1,000,000 $1,625,000 $0 $4,825,000 $3,000,000 $0 $0 $9,450,000 301-699

CORPORATION YARD WORKSHOPS EXTERIOR PAINT
(2020-2021) 20-21 $200,000 $0 $200,000 $0 $0 $0 $0 $0 $200,000 301-700 FUEL SYSTEMS IMPROVEMENTS (2021-2022) 21-22 $3,077,946 $1,144,054 $4,222,000 $0 $0 $0 $0 $0 $4,222,000 405-704
LARGE WATER METER REPLACEMENTS (fka: WATER

TRANSMISSION AND DISTRIBUTION SYSTEMS
IMPROVEMENTS)(2021-2022) 21-22 $1,250,000 $0 $1,250,000 $0 $0 $0 $0 $0 $1,250,000 455-705 EMERGENCY GENERATOR REPLACEMENTS (FY 2021-2022) 21-22 $2,300,000 $1,900,000 $4,200,000 $2,000,000 $0 $0 $0 $0 $6,200,000 301-707 INSTALL REAR SECURITY GATES (2022-2023) 22-23 $500,000 $0 $500,000 $0 $0 $0 $0 $0 $500,000 301-708 RENOVATE ELEVATORS IN CITY BUILDINGS (2022-2023) 22-23 $800,000 $200,000 $1,000,000 $0 $0 $0 $0 $0 $1,000,000 455-710

SHELL BRIDGE SANITARY SEWER FORCE MAIN
REHABILITATION (FY 2022-2023) 22-23 $500,000 $500,000 $1,000,000 $500,000 $0 $0 $0 $0 $1,500,000 301-711 POLICE STATION KITCHEN REMODEL (2023-2024) 23-24 $130,000 $0 $130,000 $0 $0 $0 $0 $0 $130,000 301-712

EDGEWATER PARK SOFTBALL AND SOCCER SYNTHETIC
RESURFACING (2023-2024) 23-24 $900,000 $350,000 $1,250,000 $0 $0 $0 $0 $0 $1,250,000 301-713 LIGHT INSTALLATION AT BOOTHBAY PARK (2023-2024) 23-24 $250,000 $0 $250,000 $0 $0 $0 $0 $0 $250,000 301-714 SEA CLOUD MAINTENANCE SHED (2023-2024) 23-24 $300,000 $0 $300,000 $0 $2,000,000 $0 $0 $0 $2,300,000 301-715

SUBSTRUCTURE AND SUPERSTRUCTURE BRIDGE
IMPROVEMENTS (2023-2024) 23-24 $400,000 $750,000 $1,150,000 $0 $0 $0 $0 $0 $1,150,000 301-716 STREET REHABILITATION (2023-2024) 23-24 $2,478,247 $200,000 $2,678,247 $0 $0 $0 $0 $0 $2,678,247 301-717

LAGOON PUMP STATION REHABILITATION AND CAPACITY

ENHANCEMENT
(NEW NAME) (FY 2023-2024) 23-24 $2,000,000 $0 $2,000,000 $6,950,000 $4,000,000 $4,300,000 $0 $0 $17,250,000 301-718

LAGOON PUMP STATION BUILDING REHABILITATION
(2023-2024) 23-24 $200,000 $470,000 $670,000 $0 $0 $0 $0 $0 $670,000 (Continued to next page)

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

33 (Continued from last page)

TABLE D
ACTIVE AND PROPOSED CIP'S THROUGH FY 2029-30
ACTIVE

PROJECT DESCRIPTION
FY
AUTH

PRIOR YRS

BUDGET &
ADJ

CURRENT

YR BUDGET
& ADJ (FY
2024-25)
TOTAL

APPROVED

BUDGET &
ADJ 2025-26 2026-27 2027-28 2028-29 2029-30

ESTIMATED
TOTAL

PROJECT
BUDGET
455-719
SANITARY SEWER LIFT STATION IMPROVEMENTS - PHASE 6
(FY 2023-2024) 23-24 $600,000 $0 $600,000 $7,900,000 $1,000,000 $0 $0 $0 $9,500,000 301-720 CITY HALL EXTERIOR REHABILITATION 24-25 $0 $200,000 $200,000 $0 $0 $0 $0 $0 $200,000 301-721 LAGOON INTAKE STRUCTURE REHABILITATION (2024-2025) 24-25 $0 $30,000 $30,000 $0 $0 $0 $0 $0 $30,000 301-722 STREET REHABILITATION (2024-2025) 24-25 $0 $1,500,000 $1,500,000 $50,000 $700,000 $0 $0 $0 $2,250,000 405-723 WATER MAIN CONDITION ASSESSMENT (FY 2024-2025) 24-25 $0 $250,000 $250,000 $500,000 $0 $0 $0 $0 $750,000 301-724 PARK PATHWAY RESTORATION (2024-2025) 24-25 $0 $600,000 $600,000 $0 $0 $0 $0 $0 $600,000 NEW

INSTALL ELECTRIC VEHICLE CHARGING STATIONS (FY
2025-2026) 25-26 $0 $0 $0 $1,000,000 $100,000 $500,000 $0 $0 $1,600,000 NEW STREET REHABILITATION (FY 2025-2026) 25-26 $0 $0 $0 $2,000,000 $0 $0 $0 $0 $2,000,000 NEW

PERMANENT EMERGENCY BYPASS TRANSMISSION MAIN ON
E. THIRD AVE. (FY 2025-2026) 25-26 $0 $0 $0 $300,000 $700,000 $0 $0 $0 $1,000,000 NEW

TENNIS AND BASKETBALL COURTS RESURFACING (FY
2026-2027) 26-27 $0 $0 $0 $0 $320,000 $0 $0 $0 $320,000 NEW

PASSIVE TURF REMOVAL AND LANDSCAPE ENHANCEMENT
(FY 2026-2027) 26-27 $0 $0 $0 $0 $1,100,000 $0 $0 $0 $1,100,000 NEW
CATAMARAN AND SEA CLOUD S3 SYTHETIC RESURFACING
(FY 2026-2027) 26-27 $0 $0 $0 $0 $1,800,000 $0 $0 $0 $1,800,000 NEW

AMPHITHEATER SYNTHETIC TURF RESURFACING (FY
2026-2027) 26-27 $0 $0 $0 $0 $120,000 $0 $0 $0 $120,000

NEW FIRE AND RESCUE BOAT RAMP REHABILITATION (FY
2026-2027) 26-27 $0 $0 $0 $0 $80,000 $0 $200,000 $0 $280,000 NEW BICYCLE AND PEDESTRIAN IMPROVEMENTS (FY 2026-2027) 26-27 $0 $0 $0 $0 $325,000 $0 $0 $0 $325,000 NEW STREET REHABILITATION (FY 2026-2027) 26-27 $0 $0 $0 $0 $2,000,000 $0 $0 $0 $2,000,000 NEW

WATER TANK LINING AND STRUCTURAL RETROFIT (FY
2026-2027) 26-27 $0 $0 $0 $0 $750,000 $5,250,000 $0 $0 $6,000,000 NEW LARGE WATER VALVE REPLACEMENT (FY 2026-2027) 26-27 $0 $0 $0 $0 $1,000,000 $500,000 $0 $0 $1,500,000 NEW
COATING ON 24-INCH TRANSMISSION MAIN AT SEAL
SLOUGH BRIDGE (FY 2026-2027) 26-27 $0 $0 $0 $0 $1,000,000 $0 $0 $0 $1,000,000 NEW

WATER FACILITIES SEISMIC VULNERABILITY ASSESSMENT
(FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $125,000 $0 $0 $125,000 NEW

SANITARY SEWER MANHOLE REPLACEMENTS (FY
2026-2027) 26-27 $0 $0 $0 $0 $500,000 $2,000,000 $0 $0 $2,500,000 NEW

CORPORATION YARD FENCE REPLACEMENT/
REHABILITATION (FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $2,000,000 $0 $0 $2,000,000 NEW

REPLACE CITY HALL AND FIRE STATION ROOF (FY
2027-2028) 27-28 $0 $0 $0 $0 $0 $500,000 $0 $0 $500,000 NEW PARK PATHWAY REHABILITATION (FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $600,000 $0 $0 $600,000 NEW

DOG PARK INFRASTRUCTURE UPGRADE AND SYNTHETIC
TURF REPLACEMENT (FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $500,000 $0 $0 $500,000 NEW STREET REHABILITATION (FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $2,000,000 $0 $0 $2,000,000 (Continued to next page)

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

34 (Continued from previous page)

TABLE D
ACTIVE AND PROPOSED CIP'S THROUGH FY 2029-30
ACTIVE

PROJECT DESCRIPTION
FY
AUTH

PRIOR YRS

BUDGET &
ADJ

CURRENT

YR BUDGET
& ADJ (FY
2024-25)
TOTAL

APPROVED

BUDGET &
ADJ 2025-26 2026-27 2027-28 2028-29 2029-30

ESTIMATED
TOTAL

PROJECT
BUDGET
NEW

ASSESSMENT OF CATHODIC PROTECTION ANODE BEDS (FY
2027-2028) 27-28 $0 $0 $0 $0 $0 $500,000 $0 $0 $500,000 NEW

TWO ENGINES AND PUMP REPLACEMENT AT WATER
BOOSTER PUMP STATION (FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $375,000 $600,000 $0 $975,000 NEW

OVERFLOW, REDUNDANCY, BYPASSING AND BACKUP
POWER STUDY (FY 2027-2028) 27-28 $0 $0 $0 $0 $0 $100,000 $1,000,000 $0 $1,100,000 NEW

PLACEHOLDER PENDING PARK SYSTEM MASTER PLAN (FY
2027-2028) 27-28 $0 $0 $0 $0 $0 $8,760,000 $3,500,000 $6,741,000 $19,001,000 NEW REPLACE COUNCIL CHAMBERS HVAC (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $500,000 $0 $500,000 NEW PARKING LOT RESURFACING (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $600,000 $0 $600,000 NEW

PORT ROYAL SYNTHETIC TURF RESURFACING (FY
2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $925,000 $0 $925,000 NEW STREET REHABILITATION (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $2,000,000 $0 $2,000,000 NEW

CHLORINE ANALYZERS AND AUTOFLUSHERS AT VARIOUS
LOCATIONS (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $700,000 $0 $700,000 NEW EAST HILLSDALE BOULEVARD LOOP (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $138,000 $0 $138,000 NEW WASTEWATER MASTER PLAN (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $600,000 $0 $600,000 NEW

SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE
7 (FY 2028-2029) 28-29 $0 $0 $0 $0 $0 $0 $3,200,000 $3,000,000 $6,200,000 NEW
SEA CLOUD S1, S2, B1 SYNTHETIC RESURFACING (FY
2029-2030) 29-30 $0 $0 $0 $0 $0 $0 $0 $1,300,000 $1,300,000 NEW STREET REHABILITATION (FY 2029-2030) 29-30 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $2,000,000 NEW LARGE WATER VALVE REPLACEMENT (FY 2029-2030) 29-30 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $1,000,000 TOTAL $241,636,962 $22,921,509 $264,558,471 $31,626,516 $23,877,803 $31,010,000 $13,963,000 $14,041,000 $379,076,790

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

35 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN BD-01 (CIP 301-677)
LIBRARY EXTERIOR IMPROVEMENTS AND RE-LANDSCAPING (FY 2017-2018) Project Category: C
Project Description:

Staff has cured prior water intrusion issues by removing soil away from the northwest wall of the building and re-landscaping the northwest area in house into an attractive drought tolerant and water efficient habitat garden to attract pollinators such as butterflies and hummingbirds. Funding from this project was further utilized in FY 2024-2025 to improve the curb ramps at the front of the Library/Community Center building to current Americans with Disability Act (ADA) standards.

This project will complete the Library building exterior improvements on the southwest side of the building.

This project will provide for permanently removing the earth around the southwest wall of the library building, sealing the wall, installing wall drains and drainpipes, and re-grading the earth around the exterior of the building.

The roots of the trees adjacent to the north wall of the library could contribute to water intrusion as well as eventual long-term damage to the building structure and nearby utilities. This CIP would provide funding to investigate the extent of root intrusion and propose options to root prune and/or remove the trees.

The soil removal and landscaping will be performed in-house by staff. A consultant will develop project plans and specifications to seal the wall and install appropriate drainage from the building and incorporate the landscape improvements.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP -
City $0 $200,000 $0 $0 $0 $200,000
Total Funding
Sources $0 $200,000 $0 $0 $0 $200,000
Expenditures
Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project
Costs $0 $176,600 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $5,200 $0 $0 $0
Total $0 $181,800 $0 $0 $0 $18,200 $200,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

36 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN BD-02 (NEW CIP)
INSTALL ELECTRIC VEHICLE CHARGING STATIONS (FY 2025-2026) Project Category: B
Project Description:

The California Air Resources Board has passed its Advanced Clean Fleets regulations which mandate that cities electrify medium- and heavy-duty vehicles. The first step in adopting any significant electrification of the fleet is to invest in the infrastructure necessary to power an electric fleet.

In November 2023, the City Council approved an agreement with Peninsula Clean Energy to participate in its Public EV Fleets Program “GovEV”. The GovEV program provides free technical assistance, project planning, and grant funding to public agencies for new municipal EVs and fleet charging infrastructure. As part of the PCE GovEV program, the City agreed to install municipal EV chargers. This project will implement charging stations and related infrastructure (like generators and/or additional electrical service) identified through the process.

Public Works staff has been actively working with Peninsula Clean Energy and its consultant to plan the City’s infrastructure needs, starting at the Corporation Yard, followed by other City facilities.

Estimated Project Schedule:

Preliminary Design: FY 2024-2025
Design: FY 2025-2026
Construction: FY 2025-2026 (Phase 1); FY 2026-2027 (Phase 2)

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $1,000,000 $100,000 $500,000 $0 $0 $1,600,000 Total Funding Sources $1,000,000 $100,000 $500,000 $0 $0 $1,600,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $869,600 $84,500 $410,200 $0 $0 Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $2,500 $24,600 $0 $0
Total $869,600 $87,000 $434,800 $0 $0 $208,600 $1,600,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

37 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN BD-03 (NEW CIP)
CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (FY 2027-2028) Project Category: B
Project Description:

This project will rehabilitate the existing Corporation Yard fence which has been damaged by saltwater corrosion carried out by high winds. The fence was constructed in 1991 and extends approximately 1,500 feet along the perimeter of the City/District Corporation Yard on East Third Avenue and a portion along the west edge of Tank No. 4. It is an eight (8) foot high “woodcrete” structure (precast concrete fence that mimics the look of wood) that rests on a woodcrete retaining wall and foundation with built in drainage of varying depth. The fence serves as a protective barrier, ensuring the security of Parks, Public Works, and Fire Department equipment and vehicles and prevents unauthorized access from non-City personnel.

Over the years corrosion has damaged the rebar within the fence which has compromised its structural integrity and made it vulnerable to weather events and forced entries. Staff has performed ongoing maintenance and repairs to address issues and multiple failures to the fence.

The project will assess the condition of the existing fence and provide either a new fence or replacement of deteriorated panels. Portions of the landscaping on the north side of the fence may need to be removed and replaced to allow access for construction.

Estimated Project Schedule:

Design: FY 2027-2028
Construction: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $0 $1,000,000 $0 $0 $1,000,000 Fund 405 - CIP - Water $0 $0 $500,000 $0 $0 $500,000
Fund 455 - CIP -
Wastewater
$0 $0 $500,000 $0 $0 $500,000
Total Funding Sources $0 $0 $2,000,000 $0 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $1,640,700 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $98,400 $0 $0
Total $0 $0 $1,739,100 $0 $0 $260,900 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

38 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN BD-04 (NEW CIP)
REPLACE CITY HALL AND FIRE STATION ROOF (FY 2027-2028)
Project Category: B
Project Description:

The City Hall and Fire Station roofs were installed when the Government Center Improvements Project was constructed in 2002. Staff has performed ongoing maintenance and repairs to address identified leaks and issues related to the roof. This project will address water infiltration that has occurred from the exterior into the City Hall and Fire Station building interiors that result from failure of joint sealant on the building exterior.

This project will seal exterior walls and refurbish the roof and walls for the Fire Station and City Hall. This project will not replace the metal portions of the roof which remain under warranty.

Estimated Project Schedule:

Design: FY 2027-2028
Construction: FY 2027-2028

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 505 - Building
Maintenance Fund $0 $0 $500,000 $0 $0 $500,000
Total Funding Sources $0 $0 $500,000 $0 $0 $500,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $410,200 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $24,600 $0 $0
Total $0 $0 $434,800 $0 $0 $65,200 $500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

39 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN BD-05 (NEW CIP)
REPLACE COUNCIL CHAMBERS HVAC (FY 2028-2029)
Project Category: B
Project Description:

Due to the age and capacity of the Heating/Ventilation/Air Conditioning (HVAC) at the City Council Chambers which was constructed in 2002, the existing system needs to be replaced and upgraded. The HVAC system is over 20 years old and near the end of its useful life. Additionally, the maximum operation of the HVAC system is not sufficient to meet the needs of users when the Council Chambers are at full capacity. In particular, the cooling capacity of the system cannot accommodate a fully occupied Council Chambers, resulting in an overheated environment.

The project includes replacing and upgrading four (4) air conditioning condensers and verifying the condition of and replacing damaged or aged system parts such as boots and pans. A qualified professional will be engaged to perform an inspection of the facilities to establish the final scope of work prior to the preparation construction documents for bidding.

Estimated Project Schedule:

Design: FY 2028-2029
Construction: FY 2028-2029

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 505 - Building
Maintenance Fund $0 $0 $0 $500,000 $0 $500,000
Total Funding Sources $0 $0 $0 $500,000 $0 $500,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $398,900 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $35,900 $0
Total $0 $0 $0 $434,800 $0 $65,200 $500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

40 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-01 (CIP 301-678)
RECREATION CENTER REBUILD (FY 2017-2018)
Project Category: A
Project Description:

On January 23, 2019, the City Council by Minute Order No. 1585 accepted the Final Recreation Center Master Plan Conceptual Design Report. On January 31, 2022, the City Council received an update that included the results of a Community Survey to validate the Community Input that had been received in the extensive community engagement that was completed, pre-pandemic, in 2017. The City Council adopted Minute Order 1832, directing staff to 1) Accept the Recreation Center and Parks System Survey results, confirming staff has satisfied the City Council’s interest in validating programming and usage assumptions; 2) Proceed with a “build-to-budget” option for the Recreation Center in an amount not-to- exceed $55 million; and 3) Proceed with utilizing $36 million from the Capital Asset Acquisition and Replacement Fund and $19 million from the General Fund Reserves for the total not-to-exceed budget of $55 million for rebuilding the Recreation Center.

At the City Council regular meeting on November 21, 2022, the City Council awarded an agreement with Group 4 Architecture, Research + Planning, Inc. (“Group 4”) for professional design, bidding, and construction support services. The design phase began in January 2023 with the award of a construction management contract to Griffin Structures. The construction management firm’s early involvement to assist with constructability review of the design plans helps to provide a seamless design to construction process.

At the regular City Council meeting on September 18, 2023, staff and Group 4 presented to City Council a full schematic design which included an estimate of probable construction costs and a list of bid alternatives with cost information for City Council’s consideration. The City Council accepted the schematic design budget estimate of $63,356,000 for the Project and provided direction on additional project enhancements to be included resulting in an increase to construction estimate by $2,172,000.

In addition, the City Council approved the temporary facilities and transition plan for the Project at the regular City Council meeting on November 6, 2023, resulting in an increase to the overall Project costs.

With the added Project enhancements, contingency and escalation factors, the total Project cost estimate at that time was $65,934,000.

At the regular City Council meeting on January 16, 2024, the City Council provided direction on various strategies to address closing the funding gap for the project. These strategies include a mix of revenue opportunities such as grants and development impact fees, as well as elimination and re-prioritization of other capital projects to free up funds to address the funding gap. The Project budget shortfall at the time between the approved budget of $55,374,250 and the design team’s cost estimate of $65,934,000 was $10,559,750. To address the shortfall, the City Council by Minute Order No. 1956 directed several actions including:
a. Eliminating the Bocce Court Expansion from the Project scope and budget reducing the budget by $1,009,000 while still maintaining the design as a bid alternative if the bids come in lower than anticipated;
b. Authorizing the release of $5,000,000 from the remaining Levee project funds and appropriate it to the Project;
c. Appropriating grant funds from Gilead Foundation in the amount of $500,000 toward the Project; d. Appropriating anticipated park impact fees from the new Gilead building at 331 Lakeside Drive in the amount of $594,000 to the Project: and
e. Eliminating or delaying some park CIP projects through reprioritization.

On June 3, 2024, the City Council approved the plans and specifications and authorized the issuance of call for bids for the Project. At this time there was an approved budget of $55,432,578 which included an

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

41 additional $58,323 to the total approved budget for plan check services with West Coast Code Consultants (WC3) (City Council Resolution No. 2024-21 on April 1, 2024).

The following is an overview of Project funding sources as reflected on June 17, 2024; the City Council adopted City Resolution No. 2024-66 approving the Fiscal Year 2024-2025 City Budget. This adoption added $9,092,750, increasing the overall project budget to $64,525,328.

On September 3, 2024, the City Council approved a resolution awarding a construction contract to BHM Construction, LLC for the Base Lump Sum of $40,647,000 plus the following bid alternates in the amount of $3,979,000:
a. A1 Expanded Entry Canopy
b. A3 Fitness Room Operable Partition
c. L1a Playground with Play Equipment (Option 2 – Playcraft) and Rubberized Safety Surfacing d. L2 Event Terrace Glass Wind Screen
e. L3 Bocce Courts Expansion
f. E1 Photovoltaic Panel System (without Battery Storage) The total construction contract awarded to BHM Construction including bid alternates was $44,626,000.

At its meeting on September 16, 2024, the City Council adopted Resolution No. 2024-100 reducing the total approved project budget by $3,490,558, to $61,035,000.

Following the award of the construction contract, a notice to proceed was issued to BHM on November 4, 2024. Construction has begun on the project and is expected to be completed in June 2026.

Estimated Project Schedule:

Design: FY 2022-2023 through FY 2023-2024
Construction: FY 2024-2025 through FY 2026-2027

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

42 Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 142 - Impact - Parks
Facilities $467,000 $0 $0 $0 $0 $467,000
Total Funding Sources $467,000 $0 $0 $0 $0 $467,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $406,100 $0 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $0 $0
Total $406,100 $0 $0 $0 $0 $60,900 $467,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

43 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-02 (CIP 301-714)
SEA CLOUD MAINTENANCE SHED (FY 2023-2024)
Project Category: B
Project Description:

The current maintenance shed at Sea Cloud Park is nearing 40 years old and serves as the main maintenance and storage facility for Sea Cloud Park, and also houses police communication equipment.

The maintenance facility serves as primary storage of light and heavy park maintenance equipment, a staff work and break area, and storage space for sports user groups. Over the years, the structure has had multiple roof repairs to address leaks and, despite multiple efforts to eradicate water damage the building, has suffered major dry rot damage. The project scope will include the necessary improvements to replace the building, install restroom facilities, and meet current building codes.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2026-2027

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $2,000,000 $0 $0 $0 $2,000,000 Total Funding Sources $0 $2,000,000 $0 $0 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $1,765,300 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $52,900 $0 $0 $0
Total $0 $1,818,200 $0 $0 $0 $181,800 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

44 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-03 (NEW CIP)
TENNIS AND BASKETBALL COURTS RESURFACING (FY 2026-2027) Project Category: C
Project Description:

Tennis and basketball court surfaces are typically resurfaced every five to seven years, based on an evaluation of the condition of each court, to ensure that they are safe to play on and aesthetically pleasing. The work will include asphalt section replacement, filling depressions, crack repair, acrylic resurfacing, acrylic color coat, and new line striping.

The following eight (8) Tennis Courts and six (6) Basketball Courts were last resurfaced in FY 2017-2018 and are anticipated to need resurfacing in FY 2026-2027.

TENNIS COURTS:
• (4) Boothbay Park
• (2) Recreation Center
• (2) Edgewater Park
BASKETBALL COURTS:

Full Courts:
• (1) Shad Park
• (1) Sunfish Park
• (1) Turnstone Park
• (1) Boothbay Park
Half Courts:
• (1) Port Royal Park
• (1) Ketch Park
Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2026-2027

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $320,000 $0 $0 $0 $320,000
Total Funding Sources $0 $320,000 $0 $0 $0 $320,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $282,500 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $8,400 $0 $0 $0
Total $0 $290,900 $0 $0 $0 $29,100 $320,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

45 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-04 (NEW CIP)
PASSIVE TURF REMOVAL AND LANDSCAPE ENHANCEMENT (FY 2026-2027) Project Category: B
Project Description:

This project focuses on the removal of passive turf from medians, easements, and other underutilized green spaces to align with water conservation mandates enacted in recent state legislation. The project aims to improve environmental sustainability, reduce water consumption, and enhance the functionality and aesthetics of these spaces. This project also supports recommendations in the Goose Population Management Plan for habitat modification and the reduction of geese impacts. Proposed improvements include:
• Removal of passive turf in select medians and easements, replacing it with drought-tolerant native landscaping and mulch to promote water efficiency and habitat value. • Installation of drip irrigation systems and subsurface watering infrastructure to support low-water- use plantings.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2026-2027

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $1,100,000 $0 $0 $0 $1,100,000 Total Funding Sources $0 $1,100,000 $0 $0 $0 $1,100,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $928,700 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $27,800 $0 $0 $0
Total $0 $956,500 $0 $0 $0 $143,500 $1,100,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

46 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-05 (NEW CIP)
CATAMARAN AND SEA CLOUD S3 SYTHETIC RESURFACING (FY 2026-2027) Project Category: B
Project Description:

The Sea Cloud S3 sports field synthetic turf surface was installed in 2015; the sports field synthetic turf surface at Catamaran Park was installed in 2017, and both fields are scheduled for replacement in FY 2026-2027. The timing of the replacement considers turf remaining useful life and turf manufacture warranty. The project consists of replacing the existing synthetic turf field surfaces and in-fill with non- rubber material, and spot repairs to the base material as required, to eliminate depressions.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2026-2027
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $1,800,000 $0 $0 $0 $1,800,000 Total Funding Sources $0 $1,800,000 $0 $0 $0 $1,800,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $1,588,800 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $47,600 $0 $0 $0
Total $0 $1,636,400 $0 $0 $0 $163,600 $1,800,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

47 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-06 (NEW CIP)
AMPHITHEATER SYNTHETIC TURF RESURFACING (FY 2026-2027)
Project Category: C
Project Description:

The synthetic turf surface located on the tiered portion of the amphitheater at Leo J. Ryan Park was installed in FY 2017-2018 and is scheduled for replacement in FY 2026-2027. The project consists of replacing the existing synthetic turf field surfaces and in-fill with non-rubber material, and repairing the base material, as required, to eliminate depressions. The replacement project is being timed in coordination with the opening of the new Foster City Community Center and with other park improvements.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2026-2027
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $120,000 $0 $0 $0 $120,000
Total Funding Sources $0 $120,000 $0 $0 $0 $120,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $106,000 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $3,100 $0 $0 $0
Total $0 $109,100 $0 $0 $0 $10,900 $120,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

48 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-07 (NEW CIP)
PARK PATHWAY REHABILITATION (FY 2027-2028)
Project Category: B
Project Description:

This project focuses on rehabilitating park pathways to improve safety, accessibility, and usability for all visitors. The scope of work will prioritize addressing ADA compliance and ensuring pathways align with the potential reconfiguration of park spaces. Final project details will be determined following the completion of the Park System Master Plan, allowing the improvements to reflect the community’s needs and long-term vision for the park system.

Estimated Project Schedule:

Design: FY 2027-2028
Construction: FY 2027-2028

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $0 $600,000 $0 $0 $600,000
Total Funding Sources $0 $0 $600,000 $0 $0 $600,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $492,200 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $29,500 $0 $0
Total $0 $0 $521,700 $0 $0 $78,300 $600,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

49 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-08 (NEW CIP)
DOG PARK INFRASTRUCTURE UPGRADE AND SYNTHETIC TURF REPLACEMENT (FY 2027-2028) Project Category: B
Project Description:

The dog park synthetic turf requires replacement every five to seven years due to the high volume of park users and impacts. This project consists of replacing approximately 10,000 square feet of existing synthetic turf and repairing the base material, as required, to eliminate depressions, in addition to replacement of the underlying drainage system prior to replacement of new turf. The drainage system improvements are necessary for the City to comply with stormwater requirements and lagoon water quality.

Estimated Project Schedule:

Design: FY 2027-2028
Construction: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $0 $500,000 $0 $0 $500,000
Total Funding Sources $0 $0 $500,000 $0 $0 $500,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $410,200 $0 $0
Inflation % — % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $24,600 $0 $0
Total $0 $0 $434,800 $0 $0 $65,200 $500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

50 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-09 (NEW CIP)
PARKING LOT RESURFACING (FY 2028-2029)
Project Category: C
Project Description:

Resurfacing City-owned parking lots should be done every five to seven years. Maintenance items that are necessary to keep the parking lots in good condition include: removal and replacement of failed and root-damaged asphalt, slurry seal, line striping, and upgrades to comply with the City’s ADA Transition Plan. These improvements will add to the general surface life of the asphalt before major repairs or replacements are needed.

Locations Include:

1. Boat Park/Dog Park

2. Boothbay Park

3. Port Royal Park

4. Sea Cloud Park large lot

5. Sea Cloud Park small lot

6. Baywinds Park

7. Bridgeview Park

8. Library/Community Center

9. Police Station

10. City Hall

11. Recreation Center- Boat Ramp Lot
Estimated Project Schedule:

Design: FY 2028-2029
Construction: FY 2028-2029

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $0 $0 $600,000 $0 $600,000
Total Funding Sources $0 $0 $0 $600,000 $0 $600,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $500,500 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $45,000 $0
Total $0 $0 $0 $545,500 $0 $54,500 $600,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

51 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-10 (NEW CIP)

PORT ROYAL SYNTHETIC TURF RESURFACING (FY 2028-2029)
Project Category: B
Project Description:

The synthetic turf surface at Port Royal Park was installed in FY 2018-2019 and is scheduled for replacement in FY 2028-2029. The timing of the replacement considers turf remaining useful life and turf manufacture warranty. The project consists of replacing the existing synthetic turf field surfaces and repairing the base material, as required, to eliminate depressions.

Estimated Project Schedule:

Design: FY 2028-2029
Construction: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $0 $0 $925,000 $0 $925,000
Total Funding Sources $0 $0 $0 $925,000 $0 $925,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $771,500 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $69,400 $0
Total $0 $0 $0 $840,900 $0 $84,100 $925,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

52 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-11 (NEW CIP)
SEA CLOUD S1, S2, B1 SYNTHETIC RESURFACING (FY 2029-2030) Project Category: B
Project Description:

The synthetic turf surfaces at Sea Cloud Park S1 (soccer), S2 (soccer), and B1 (baseball) were installed in FY 2019-2020 and are scheduled for replacement in FY 2029-2030. The project consists of replacing the existing synthetic turf field surfaces and the in-fill with non-rubber material, and spot repairs to the base material, as required, to eliminate depressions.

Estimated Project Schedule:

Design: FY 2029-2030
Construction: FY 2029-2030

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $0 $0 $0 $1,300,000 $1,300,000 Total Funding Sources $0 $0 $0 $0 $1,300,000 $1,300,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $0 $1,055,200
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $0 $126,600
Total $0 $0 $0 $0 $1,181,800 $118,200 $1,300,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

53 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN PK-12 (NEW CIP)
PLACEHOLDER PENDING PARK SYSTEM MASTER PLAN (FY 2027-2028) Project Category: C
Project Description:

The Parks Division is currently working with a consultant to develop a comprehensive Park System Master Plan. While that plan is being developed, Parks has proposed that funding previously proposed for projects in the five-year CIP remain in the plan for budget purposes, although the projects themselves may not ultimately be included through the Master Planning Process.

Table 1: Projects included in the FY 2024-2025 Budget; used for FY 2025-2026 budget planning purposes Project FY 2025-26 FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 Catamaran Park Improvements 550,000
Gull Park Renovation 3,810,000
Marlin Park Renovation 3,900,000
Boothbay Park Site
Improvements
500,000 3,500,000
Turnstone Park Renovation 1,722,000
Sunfish Park Renovation 2,708,000
Shad Park Renovation 2,311,000
Total:

All Placeholder Projects
— — 8,760,000 3,500,000 6,741,000
Previous Project Descriptions:
• Catamaran Park Improvements Project would add improvements that conserve water and enhance and expand current park usage.
• Gull Park and Marlin Park Improvements Projects aim to enhance accessibility, amenities, and overall usability to create a more inclusive, safe, and enjoyable space for the community while addressing site-specific challenges.
• Boothbay Park Improvements Project would enhance the park’s amenities to better serve users of all ages and abilities with a focus on creating inclusive, multi-generational, and multi-cultural spaces.
• Shad, Sunfish and Turnstone Park Improvements Projects would focus on enhancing park functionality and appeal.

Estimated Project Schedule:

Master Plan Completion estimated FY 2025-2026
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 104 - Park-In-Lieu $0 $0 $2,050,000 $0 $2,050,000
Fund 301 - CIP - City $0 $0 $8,375,000 $1,340,000 $6,306,000 $16,021,000 Fund 502 - Equipment
Replacement Fund $0 $0 $385,000 $110,000 $435,000 $930,000 Total Funding Sources $0 $0 $8,760,000 $3,500,000 $6,741,000 $19,001,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $8,264,200 $3,211,100 $6,018,800 Inflation % 0 % 3 % 6 % 9 % 12 % — %
Inflation Escalation $0 $0 $495,800 $288,900 $722,200
Total $0 $0 $8,760,000 $3,500,000 $6,741,000 $0 $19,001,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

54 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-01 (CIP 301-698)
TRAFFIC SIGNAL SYSTEM UPGRADES (FY 2020-2021)
Project Category: A
Project Description:

The City’s traffic signal system was evaluated as part of the Bicycle, Pedestrian, and Intersection Evaluation Study (CIP 301-664). This part of the study focused on inventory of the existing traffic signal infrastructure network and identified opportunities to improve efficiency through either equipment or operations enhancements. This project is built upon recommendations from CIP 301-664 and will include the following tasks for design and construction.

1. Citywide Communications Upgrade
The City's existing traffic signal communications network is in need of an upgrade to help modernize its infrastructure. The current system operates over twisted-copper pair cables using 9,600-baud modems.

The communications upgrade will bring the City's network to current standards, which will allow more flexibility with traffic operations enhancements such as improving traffic flow along the East Hillsdale Boulevard, Foster City Boulevard, and Edgewater Boulevard corridors. Upgrade options may include wireless improvements, ethernet over copper upgrade with some cellular improvements, an upgrade to fiber optics to maximize broadband capabilities, or a hybrid approach.

2. Traffic Signal Field Hardware Upgrade
• Vehicle and Pedestrian Signal Heads Replacement
• Accessible Pedestrian Signals (APS) Replacement
• Traffic Signal Cabinets Upgrades or replacements and retrofits onto existing cabinet foundations • Battery Back-up System Upgrades

3. Traffic Signal Controllers Replacement
The traffic signal controller is considered the "brain" of the signalized intersection and processes detection inputs from the field and sends out signals to turn on and off the traffic signal indications. These field units communicate with the Central Computer System located in the Public Works Engineering office. The City uses a modern controller from Trafficware but the field hardware has reached the end of its useful life.

4. Advanced Traffic Management System (ATMS) - Central Computer System Upgrade This component communicates to the traffic signal controllers and stores data for traffic signal timing development. A new system will provide an enhanced user interface.

Funding for the design and construction of the traffic signal system upgrades in this project will be provided by a combination of City CIP, Transportation Impact Fees, and state funds. Total funding in excess of $9 million may be required to implement and fully fund the design and construction of the traffic signal system upgrades.

Construction of the project is recommended to be scheduled on or after FY 2025-2026 to allow for cash reserves from non-General Fund funding sources to accumulate.

The City needs to consider how best to upgrade its network and potentially introduce enhancement of additional City services. Due to the complexity of the project, a technical memorandum will be prepared by a professional traffic engineering consultant that will compare the various upgrade alternatives and associated costs, provide recommendations for the preferred system based on the City’s current and future needs, recommend a phasing plan for design and construction of the improvements, and prepare a schedule for implementation.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

55 Estimated Project Schedule:

Technical Memorandum: FY 2025-2026
Design: FY 2025-2026 – FY2026-2027
Construction: FY 2026-2027- FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 102 - Measure A $0 $2,530,000 $210,000 $0 $0 $2,740,000 Fund 105 - Measure M $0 $250,000 $130,000 $0 $0 $380,000 Fund 136 - Measure W $0 $830,000 $470,000 $0 $0 $1,300,000 Fund 144 - Impact -
Transportation $0 $195,000 $300,000 $0 $0 $495,000
Fund 301 - CIP - City $0 $540,000 $1,890,000 $0 $0 $2,430,000 Fund 502 - Equipment
Replacement Fund $0 $480,000 $0 $0 $0 $480,000
Total Funding Sources $0 $4,825,000 $3,000,000 $0 $0 $7,825,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $4,073,500 $2,461,100 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $122,200 $147,600 $0 $0
Total $0 $4,195,700 $2,608,700 $0 $0 $1,020,600 $7,825,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

56 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-02 (NEW CIP)
STREET REHABILITATION (FY 2025-2026)
Project Category: A
Project Description:

Ongoing maintenance of the public streets is essential. This project is intended to repair/resurface public streets. To implement this ongoing program in the most cost-effective manner, a Pavement Management Program (PMP) is used. The Metropolitan Transportation Commission’s Pavement Management Technical Assistance Program (P-TAP) provides the City with various resources to better understand its pavement condition including the PMP. Through the P-TAP, pavement consultants are hired to inspect City streets and update the PMP database every two to three years. The streets selected for the next CIP project are determined primarily through the PMP program analysis. The program also helps determine the most cost-effective treatment to extend the life of the roadway. The normal repair methods include crack seal, slurry seal, dig-out repairs, and surface overlays.

The project also includes curb and gutter replacement and sidewalk repairs on the streets that are being repaired. Sharrow symbols/legends will be incorporated in this project as appropriate and as called out in the City’s Bicycle and Pedestrian Master Plan, that will begin development this spring. All improvements will be designed per the latest City and National Standards. This includes accessibility upgrades complying with the City’s ADA Transition plan and all pavement work adhering to the requirements of the MRP3.0 (Municipal Regional Stormwater Permit) of the City’s NPDES (National Pollutant Discharge Elimination System) Permit that took effect on July 1, 2023.

As part of P-TAP, the City also receives a budgetary need analysis report based the most recent pavement inspections, treatment costs, and various budget scenarios. Based on the 2024 report, the ideal pavement strategy is to increase the network average Pavement Condition Index (PCI) from 78 to 83 and maintain it over a five-year period.

Federal and state transportation grant funding is used when available. Future multi-year funding is proposed to assure availability of local matching funds to maximize grant eligibilities. Funding for the local share of the project will be provided by Measure A, Measure M, Gas Tax, SB 1 and/or Measure W sources.

Estimated Project Schedule:

Design: FY 2025-2026
Construction: FY 2025-2026
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 103 - Gas Tax 2103 $500,000 $0 $0 $0 $0 $500,000
Fund 119 - SB1 $1,500,000 $0 $0 $0 $0 $1,500,000
Total Funding Sources $2,000,000 $0 $0 $0 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $1,818,200 $0 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $0 $0
Total $1,818,200 $0 $0 $0 $0 $181,800 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

57 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-03 (NEW CIP)
FIRE AND RESCUE BOAT RAMP REHABILITATION (FY 2026-2027) Project Category: B
Project Description:

The existing fire and rescue boat ramp provides access to the San Francisco Bay from the northeast tip of Mariner’s Point/north of Baywinds Park. The fire and rescue boat ramp is primarily used as a launching point for water rescue operations.

The purpose of the project is to remove and replace the existing ramp at the northern tip of Mariner’s Point in order to improve accessibility for fire and rescue. The improvements will include temporary shoring, dewatering, demolition of the existing ramp, excavation and backfilling, and construction of various ramp improvements.

The boat ramp rehabilitation was originally included in the City’s Levee Improvement Project (designated as Access Point #1), but it was a scope item that had been added to the plans later in the design phase and was causing complications with the overall build per plan. It was determined that the re-design and construction could potentially delay the delivery of the project as well as the re-opening of the Phase 3 portion of the Levee. As a result, this portion of the scope of work was removed from the levee project.

Estimated Project Schedule:

Permitting Requirements/Design: FY 2026-2027
Construction: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $0 $80,000 $0 $200,000 $0 $280,000 Total Funding Sources $0 $80,000 $0 $200,000 $0 $280,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $67,600 $0 $159,600 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $2,000 $0 $14,300 $0
Total $0 $69,600 $0 $173,900 $0 $36,500 $280,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

58 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-04 (NEW CIP)
BICYCLE AND PEDESTRIAN IMPROVEMENTS (FY 2026-2027)
Project Category: C
Project Description:

In January 2018, Fehr & Peers performed a Bicycle, Pedestrian, and Intersection Evaluation Study (CIP 301-664) to help the City evaluate and determine the current traffic and transportation facilities and potential for improvements. As part of the study, Fehr & Peers performed an assessment for the four public schools that existed in Foster City at the time, to identify improvements to provide more comfortable bicycle and walking routes to school. The report describes citywide travel behavior trends for school trips and then provides a site assessment for each of the schools, including cost estimates for suggested enhancements. Some of the report recommendations have already been implemented. In FY2025/2026, Fehr and Peers will complete the Foster City Bicycle and Pedestrian Master Plan, which will incorporate and build upon previous studies. The master plan will outline additional improvements, as well as specific priority projects around the City.

The Bicycle and Pedestrian Improvements Project analyzes the remaining enhancements identified for each of the four Foster City public schools to meet the City’s goals for pedestrian safety and incorporates those enhancements with the proposed projects from the Foster City Bicycle and Pedestrian Master Plan.

Beach Park School, which was constructed after the Fehr & Peers study, would be included in the new assessment. Some suggested enhancements include physical changes to the roadway, curb/gutter, or sidewalk, striping, and signage modifications. A consultant would review and analyze the assessment and master plan, perform field inspections, and perform additional traffic studies to develop project plans and specifications to implement the enhancements and the potential to implement complementary improvements such as green infrastructure (e.g., stormwater treatment within curb extensions).

Based upon the proposed project schedule, an RFP for assessment and design will be issued in 2026.

Construction is anticipated in 2027.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 119 - SB1 $0 $325,000 $0 $0 $0 $325,000
Total Funding Sources $0 $325,000 $0 $0 $0 $325,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $274,400 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $8,200 $0 $0 $0
Total $0 $282,600 $0 $0 $0 $42,400 $325,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

59 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-05 (NEW CIP)
STREET REHABILITATION (FY 2026-2027)
Project Category: A
Project Description:

Ongoing maintenance of the public streets is essential. This project is intended to repair/resurface public streets. To implement this ongoing program in the most cost-effective manner, a Pavement Management Program (PMP) is used. The Metropolitan Transportation Commission’s Pavement Management Technical Assistance Program (P-TAP) provides the City with various resources to better understand its pavement condition including the PMP. Through the P-TAP, pavement consultants are hired to inspect City streets and update the PMP database every two to three years. The streets selected for the next CIP project are determined primarily through the PMP program analysis. The program also helps determine the most cost-effective treatment to extend the life of the roadway. The normal repair methods include crack seal, slurry seal, dig-out repairs, and surface overlays.

The project also includes curb and gutter replacement and sidewalk repairs on the streets that are being repaired. Sharrow symbols/legends will be incorporated in this project as appropriate and as called out in the City’s Bicycle and Pedestrian Master Plan. All improvements will be designed per the latest City and National Standards. This includes accessibility upgrades complying with the City’s ADA Transition plan and all pavement work adhering to the requirements of the MRP3.0 (Municipal Regional Stormwater Permit) of the City’s NPDES (National Pollutant Discharge Elimination System) Permit that took effect on July 1, 2023.

As part of P-TAP, the City also receives a budgetary need analysis report based the most recent pavement inspections, treatment costs, and various budget scenarios. Based on the 2024 report, the ideal pavement strategy is to increase the network average Pavement Condition Index (PCI) from 78 to 83 and maintain it over a five-year period.

Federal and state transportation grant funding is used when available. Future multi-year funding is proposed to assure availability of local matching funds to maximize grant eligibilities. Funding for the local share of the project will be provided by Measure A, Measure M, Gas Tax, SB 1 and/or Measure W sources.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2026-2027

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 102 - Measure A $0 $1,010,000 $0 $0 $0 $1,010,000
Fund 103 - Gas Tax 2103 $0 $425,000 $0 $0 $0 $425,000
Fund 119 - SB1 $0 $565,000 $0 $0 $0 $565,000
Total Funding Sources $0 $2,000,000 $0 $0 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $1,765,300 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $52,900 $0 $0 $0
Total $0 $1,818,200 $0 $0 $0 $181,800 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

60 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-06 (NEW CIP)
STREET REHABILITATION (FY 2027-2028)
Project Category: A
Project Description:

Ongoing maintenance of the public streets is essential. This project is intended to repair/resurface public streets. To implement this ongoing program in the most cost-effective manner, a Pavement Management Program (PMP) is used. The Metropolitan Transportation Commission’s Pavement Management Technical Assistance Program (P-TAP) provides the City with various resources to better understand its pavement condition including the PMP. Through the P-TAP, pavement consultants are hired to inspect City streets and update the PMP database every two to three years. The streets selected for the next CIP project are determined primarily through the PMP program analysis. The program also helps determine the most cost-effective treatment to extend the life of the roadway. The normal repair methods include crack seal, slurry seal, dig-out repairs, and surface overlays.

The project also includes curb and gutter replacement and sidewalk repairs on the streets that are being repaired. Sharrow symbols/legends will be incorporated in this project as appropriate and as called out in the City’s Bicycle and Pedestrian Master Plan. All improvements will be designed per the latest City and National Standards. This includes accessibility upgrades complying with the City’s ADA Transition plan and all pavement work adhering to the requirements of the MRP3.0 (Municipal Regional Stormwater Permit) of the City’s NPDES (National Pollutant Discharge Elimination System) Permit that took effect on July 1, 2023.

As part of P-TAP, the City also receives a budgetary need analysis report based the most recent pavement inspections, treatment costs, and various budget scenarios. Based on the 2024 report, the ideal pavement strategy is to increase the network average Pavement Condition Index (PCI) from 78 to 83 and maintain it over a five-year period.

Federal and state transportation grant funding is used when available. Future multi-year funding is proposed to assure availability of local matching funds to maximize grant eligibilities. Funding for the local share of the project will be provided by Measure A, Measure M, Gas Tax, SB 1 and/or Measure W sources.

Estimated Project Schedule:

Design: FY 2027-2028
Construction: FY 2027-2028

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 102 - Measure A $0 $0 $740,000 $0 $0 $740,000
Fund 103 - Gas Tax 2103 $0 $0 $310,000 $0 $0 $310,000
Fund 119 - SB1 $0 $0 $950,000 $0 $0 $950,000
Total Funding Sources $0 $0 $2,000,000 $0 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $1,715,300 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $102,900 $0 $0
Total $0 $0 $1,818,200 $0 $0 $181,800 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

61 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-07 (NEW CIP)
STREET REHABILITATION (FY 2028-2029)
Project Category: A
Project Description:

Ongoing maintenance of the public streets is essential. This project is intended to repair/resurface public streets. To implement this ongoing program in the most cost-effective manner, a Pavement Management Program (PMP) is used. The Metropolitan Transportation Commission’s Pavement Management Technical Assistance Program (P-TAP) provides the City with various resources to better understand its pavement condition including the PMP. Through the P-TAP, pavement consultants are hired to inspect City streets and update the PMP database every two to three years. The streets selected for the next CIP project are determined primarily through the PMP program analysis. The program also helps determine the most cost-effective treatment to extend the life of the roadway. The normal repair methods include crack seal, slurry seal, dig-out repairs, and surface overlays.

The project also includes curb and gutter replacement and sidewalk repairs on the streets that are being repaired. Sharrow symbols/legends will be incorporated in this project as appropriate and as called out in the City’s Bicycle and Pedestrian Master Plan. All improvements will be designed per the latest City and National Standards. This includes accessibility upgrades complying with the City’s ADA Transition plan and all pavement work adhering to the requirements of the MRP3.0 (Municipal Regional Stormwater Permit) of the City’s NPDES (National Pollutant Discharge Elimination System) Permit that took effect on July 1, 2023.

As part of P-TAP, the City also receives a budgetary need analysis report based the most recent pavement inspections, treatment costs, and various budget scenarios. Based on the 2024 report, the ideal pavement strategy is to increase the network average Pavement Condition Index (PCI) from 78 to 83 and maintain it over a five-year period.

Federal and state transportation grant funding is used when available. Future multi-year funding is proposed to assure availability of local matching funds to maximize grant eligibilities. Funding for the local share of the project will be provided by Measure A, Measure M, Gas Tax, SB 1 and/or Measure W sources.

Estimated Project Schedule:

Design: FY 2028-2029
Construction: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 102 - Measure A $0 $0 $0 $725,000 $0 $725,000
Fund 103 - Gas Tax 2103 $0 $0 $0 $325,000 $0 $325,000
Fund 119 - SB1 $0 $0 $0 $950,000 $0 $950,000
Total Funding Sources $0 $0 $0 $2,000,000 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $1,668,100 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $150,100 $0
Total $0 $0 $0 $1,818,200 $0 $181,800 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

62 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN ST-08 (NEW CIP)
STREET REHABILITATION (FY 2029-2030)
Project Category: A
Project Description:

Ongoing maintenance of the public streets is essential. This project is intended to repair/resurface public streets. To implement this ongoing program in the most cost-effective manner, a Pavement Management Program (PMP) is used. The Metropolitan Transportation Commission’s Pavement Management Technical Assistance Program (P-TAP) provides the City with various resources to better understand its pavement condition including the PMP. Through the P-TAP, pavement consultants are hired to inspect City streets and update the PMP database every two to three years. The streets selected for the next CIP project are determined primarily through the PMP program analysis. The program also helps determine the most cost-effective treatment to extend the life of the roadway. The normal repair methods include crack seal, slurry seal, dig-out repairs, and surface overlays.

The project also includes curb and gutter replacement and sidewalk repairs on the streets that are being repaired. Sharrow symbols/legends will be incorporated in this project as appropriate and as called out in the City’s Bicycle and Pedestrian Master Plan. All improvements will be designed per the latest City and National Standards. This includes accessibility upgrades complying with the City’s ADA Transition plan and all pavement work adhering to the requirements of the MRP3.0 (Municipal Regional Stormwater Permit) of the City’s NPDES (National Pollutant Discharge Elimination System) Permit that took effect on July 1, 2023.

As part of P-TAP, the City also receives a budgetary need analysis report based the most recent pavement inspections, treatment costs, and various budget scenarios. Based on the 2024 report, the ideal pavement strategy is to increase the network average Pavement Condition Index (PCI) from 78 to 83 and maintain it over a five-year period.

Federal and state transportation grant funding is used when available. Future multi-year funding is proposed to assure availability of local matching funds to maximize grant eligibilities. Funding for the local share of the project will be provided by Measure A, Measure M, Gas Tax, SB 1 and/or Measure W sources.

Estimated Project Schedule:

Design: FY 2029-2030
Construction: FY 2029-2030
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 102 - Measure A $0 $0 $0 $0 $700,000 $700,000
Fund 103 - Gas Tax 2103 $0 $0 $0 $0 $300,000 $300,000
Fund 119 - SB1 $0 $0 $0 $0 $1,000,000 $1,000,000
Total Funding Sources $0 $0 $0 $0 $2,000,000 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $0 $1,623,400
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $0 $194,800
Total $0 $0 $0 $0 $1,818,200 $181,800 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

63 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN SW-01 (CIP 301-717)

LAGOON PUMP STATION REHABILITATION AND CAPACITY ENHANCEMENT (NEW NAME) (FY 2023-2024)
Project Category: A
Project Description:

This project carries a new name and is a combination of two previous CIPs, CIP 301-717 Add Third & Fourth Lagoon Pump & CIP 301-718 Lagoon Pump Station Building Rehabilitation. Due to long lead times for equipment, primarily pumps and engines, the project will be executed in phases. This approach will ensure that the combined scope is delivered in a feasible and timely manner.

The project includes necessary seismic and structural improvements and rehabilitation to the Lagoon Pump House building. This includes seismic strengthening of the building walls; replacement of the lagoon walkway and the rehabilitation of the bayside walkway; replacement of the lagoon trash racks, discharge slide gates and motors, and discharge flap gates; along with various concrete repairs. It will also involve the removal of the remnants of two lagoon pump engines, impellers, shafts, and associated plumbing that were abandoned in place when the current pumps were installed in 2001. These steps will enable the installation of a third and possibly fourth functioning lagoon pumps in these newly vacant pump bays. Additionally, the project will investigate options for de-silting the existing culvert that runs underneath E. 3rd Avenue in the aft bay of the lagoon pumps to ensure maximum discharge flow from the Pump Station.

The Lagoon Pump Station, located at the City/District’s Corporation Yard, houses two engines/pumps that pump lagoon water into the Bay to control the water level of the interior lagoon. Constructed in the early 1960s, it is one of the oldest City-owned buildings. Water flows through the culverts under the lagoon pump station building and is then pumped into the Bay. Severe concrete spalling has been noted in some locations on the building, leading to weakened load-bearing capacities and increased vulnerability to seismic activity. These issues compromise the structural integrity of critical elements, potentially reducing the building’s safety and lifespan. Furthermore, numerous structural code changes have been adopted since the building's design, necessitating upgrades to bring this critical building up to code and increase its seismic resilience. This project will include a seismic analysis of the building and recommendations for structural improvements to meet current standards and ensure the facility remains resilient during a seismic event.

In addition to the structural issues at the Lagoon Pump House, there are pumping capacity and redundancy concerns. Studies have shown that from 1974 to 2019 severe storms have become more frequent and grown in intensity due to climate change effects . During significant storm events, both lagoon pumps have occasionally been in operation while the lagoon level continued to rise. This problem is expected to worsen with sea level rise and the increased severity of atmospheric rivers predicted due to climate change. This project will add a third and possibly fourth pump to the station, providing redundancy to reduce flooding risks in the event of a failure of either of the two existing pumps during severe storms and high tide conditions. The project will retrofit all four bays’ trash racks: two currently lack racks, and the other two have a known deficiency of a three-foot opening between the bottom of the trash rack and the base of the intake structure. Additionally, the existing flap gates, slide gates, and tide gates in the two old bays are beyond their service life and require replacement.

The two existing lagoon pumps were replaced in 2001 and are 20 years old. Although the useful life is approximately 35 years, if one were to fail, it could take several weeks to repair. In recent years, there have been incidents in which debris such as tires, etc. have caused a pump to fail. If this were to occur during a storm event, it could have devastating impacts. Adding a third and fourth pump would allow for uninterrupted operation, redundancy, staggered replacement of the lagoon pumps, and provide maximum protection against the potential for flooding and property damage. More information and cost estimate updates are expected once preliminary engineering is finished.

In FY 2024-2025, the City received a $1.38M grant from FEMA for this project. Acceptance of these funds place the project under the requirements of the Code of Federal Regulations which require submittals to

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

64 FEMA, including but not limited to Hydraulics Study, Benefit Cost Analysis, and Environmental Documentation, any of which may slow down the pace of the overall project.

Estimated Project Schedule:

Design: FY 2024-2025 through FY 2025-2026
Construction: Phase 1 FY 2025-2026, Phase 2 FY 2026-2027 Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $6,950,000 $4,000,000 $4,300,000 $0 $0 $15,250,000 Total Funding Sources $6,950,000 $4,000,000 $4,300,000 $0 $0 $15,250,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $6,043,500 $3,377,000 $3,527,500 $0 $0 Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $101,300 $211,600 $0 $0
Total $6,043,500 $3,478,300 $3,739,100 $0 $0 $1,989,100 $15,250,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

65 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN SW-02 (CIP 301-721)
LAGOON INTAKE STRUCTURE REHABILITATION (FY 2024-2025)
Project Category: A
Project Description:

The City’s lagoon system intakes water via three pipes and a system of gates on the southern end of the City near Wheel House Lane. The interior structure, built in the late 1960s, has some deficiencies that are in need of repair and require further investigation to better understand the extent of necessary repairs.

The overall structure consists of an intake structure with three, 42-inch slide gates, three 42-inch reinforced concrete pipes that run from the bay to the lagoon under Sea Cloud Park, and an outfall structure with three 42-inch flap gates. The flap gates have exceeded their useful life and are in need of replacement to ensure they work as designed. Concrete spalling has been noted on the outfall structure which needs to be investigated to see the extent of repairs needed.

Permits for this work are likely needed from both the Regional Water Quality Control Board (RWQCB) and the United States Army Corps of Engineers. (USACE). While these permits are not expected to place onerous restrictions on the project, they will take around 6 months to obtain and will restrict the working window for the project and will impact project delivery time.

An investigative study is needed to fully scope the project and lay out any environmental and permit clearance. This will be followed by an engineering design and then construction of the rehabilitation.

Estimated Project Schedule:

Technical Memo: 2024-25
Design: FY 2025-26
Construction: FY 2026-2027

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 301 - CIP - City $50,000 $700,000 $0 $0 $0 $750,000 Total Funding Sources $50,000 $700,000 $0 $0 $0 $750,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $43,500 $591,000 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $17,700 $0 $0 $0
Total $43,500 $608,700 $0 $0 $0 $97,800 $750,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

66 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-01 (CIP 405-723)
WATER MAIN CONDITION ASSESSMENT (FY 2024-2025)
Project Category: A
Project Description:

This project is identified in the Water Distribution System Master Plan (Master Plan). The 24-inch cement mortar lined and coated steel transmission main is the District’s sole source of water from SFPUC and was constructed in 1962. A condition assessment of the transmission main was performed in 2005. At the time, the District’s transmission main was determined to be in very good condition. The Master Plan recommended that the District’s transmission main undergo a new assessment every 20 years.

In FY2024-25, staff hired a consultant to evaluate the current condition of the transmission main. This project’s purpose is to identify any existing leaks and existing vulnerabilities along the main and make recommendations for repair and rehabilitation. Various non-destructive technologies will be employed to assess and inspect the main. Collectively, the data gathered from the inspections will help to identify locations along the pipeline alignment where there are leaks, coating and/or lining damage, or where the pipe wall is thinning. The findings from this assessment will help the District prioritize future improvements. A Technical Memorandum will be prepared summarizing the findings and including recommendations for Capital Improvement Projects with Engineer’s cost estimates. Staff will analyze the summary of recommendations for incorporation into the City’s CIP.

Estimated Project Timeline:

Assessment: FY 2024-2025 and FY2025-2026
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $500,000 $0 $0 $0 $0 $500,000
Total Funding Sources $500,000 $0 $0 $0 $0 $500,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $454,500 $0 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $0 $0
Total $454,500 $0 $0 $0 $0 $45,500 $500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

67 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-02 (NEW CIP)
PERMANENT EMERGENCY BYPASS TRANSMISSION MAIN ON E. THIRD AVE. (FY 2025-2026) Project Category: A
Project Description:

This project will improve water supply reliability and redundancy and minimize water service interruptions in a catastrophic seismic event. The District’s 24-inch water transmission main pipeline is the sole source of potable water for the City and is attached to the Seal Slough Bridge. Seal Slough Bridge was built in the 1930’s and is used as a pedway only. The bridge is aging and could fail in the event of a seismic event and with it, the District would lose its primary water supply.

As part of CIP 636 Water System Improvements and Valve Replacements Project, two 12-inch emergency water bypass connections, with isolation valves and fittings, were constructed on the transmission main beyond the ends of the bridge to provide a means of restoring water service quickly in the event of the bridge and pipeline failure. As part of the project 1,250 feet of 12-inch temporary bypass piping was purchased and is being stored at the District’s Corporation Yard. This pipe can be assembled by staff quickly (within 1-2 days) in an emergency to restore flow until the transmission main can be repaired.

This project provides for the construction of a permanent bypass pipe to be attached to the adjacent bridge on East Third Avenue and joined at the second bypass connection that was constructed as part of CIP 636. Acquisition of environmental permits for construction over the slough and coordination with the City of San Mateo will be required. The permanent bypass pipe would provide a redundant water supply immediately and increase speed of response during an emergency.

Estimated Project Schedule:

Design: FY 2025-2026
Construction: FY2026-2027

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $300,000 $700,000 $0 $0 $0 $1,000,000 Total Funding Sources $300,000 $700,000 $0 $0 $0 $1,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $260,900 $591,000 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $17,700 $0 $0 $0
Total $260,900 $608,700 $0 $0 $0 $130,400 $1,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

68 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-03 (NEW CIP)
WATER TANK LINING AND STRUCTURAL RETROFIT (FY 2026-2027) Project Category: A
Project Description:

This project consists of full interior lining (coating) and structural retrofit of the roof rafters and center columns of the District’s three 4 million gallon steel water storage tanks. The tanks are located at the District’s Corporation Yard. Steel water tanks must be coated on a regular basis, roughly every 20 years, to ensure they do not corrode, which could lead to structural deterioration or leaks that may render the tanks unusable.

A 2020 condition assessment was conducted on the three tanks by two consultants: Villalobos & Associates and CSI. The assessment consisted of inspecting the tanks’ interior and exterior coating and cathodic protection systems. The consultants recommended replacing the coating systems in all three of the District’s tanks with order of importance being the exterior, then the interior of the tanks. Due to the prohibitive cost of fully recoating the interior and exterior of all tanks, the District split this work with the full exterior coating and portions of interior coating and spot repair being performed as part of CIP 405-660 Water Tanks & Facilitates Improvement Project. The full interior coating will be completed as a part of this project.

While working on the tanks during CIP 405-660, the extent of corrosion encountered on the roof rafters in the interior of the tanks ranged from moderate to severe, with some portions of the roof rafters requiring immediate replacement. The most severe corrosion observed on all three tanks, was located at the top of the center columns, near the center vents. The center column is the landing for all rafters, is a vital structural element, and likely the most corrosive environment in the tank. This project will retrofit the center column to be moved away from the roof vent and permanently relocate the rafters away from the vent as well.

The design and construction for this work will be completed in two phases. Design and construction of the first two tanks followed by the last tank, with the intent for construction to be staggered to ensure tanks are available for operations and to spread out costs.

Estimated Project Schedule:

Design: FY 2026-2027- 2 tanks, FY2030-2031 – 1 tank
Construction: FY 2027-2028 – 2 tanks, FY2031-2032 – 1 tank

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $750,000 $5,250,000 $0 $0 $6,000,000 Total Funding Sources $0 $750,000 $5,250,000 $0 $0 $6,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $633,300 $4,306,800 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $18,900 $258,400 $0 $0
Total $0 $652,200 $4,565,200 $0 $0 $782,600 $6,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

69 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-04 (NEW CIP)
LARGE WATER VALVE REPLACEMENT (FY 2026-2027)
Project Category: B
Project Description:

This project is part of the District’s ongoing program of maintaining and upgrading the water system through the installation of new valves, replacement of existing valves (8-inches and larger) and various improvements to the water system to improve reliability and minimize service impacts to customers.

Valves included on the replacement list are either leaking, no longer functioning properly, or have reached the end of their useful life. The valves are discovered primarily through testing during the water main / fire hydrant flushing program. Additional valves are added to the project by inspecting the system and identifying the need for additional isolation valves to provide more reliable service to customers.

This on-going program helps keep the water distribution system in good condition to allow the provision of reliable service to the community. The program may include strategic use of line-stop technologies to minimize water service interruptions to large blocks of customers during the construction period.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $1,000,000 $500,000 $0 $0 $1,500,000 Total Funding Sources $0 $1,000,000 $500,000 $0 $0 $1,500,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $844,300 $410,200 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $25,300 $24,600 $0 $0
Total $0 $869,600 $434,800 $0 $0 $195,600 $1,500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

70 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-05 (NEW CIP)
COATING ON 24-INCH TRANSMISSION MAIN AT SEAL SLOUGH BRIDGE (FY 2026-2027) Project Category: B
Project Description:

This project will address the application of exterior coating on the 24-inch transmission main attached to the Seal Slough Bridge. An inspection of the pipeline will be performed, followed by preparation of a technical memorandum recommending removal and coating alternatives, and regulatory permitting requirements, including cost estimates for the pipe preparation and coating application. Design and construction will follow.

The Foster City/EMID 24-inch water transmission main is attached to and runs along the length of the Seal Slough Bridge. This steel line is exposed to the elements of the bay. After years of exposure to sun and saltwater air along the bay shore, the original protective coating shows signs of age and corrosion and the pipeline requires recoating to prolong its life. This transmission line runs over the San Francisco Bay and will require procurement of regulatory permits for work over the waterway.

Estimated Project Schedule:

Assessment and Design: 2026-2027
Construction: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $500,000 $0 $0 $0 $500,000
Fund 409 - Water Connection
Fees $0 $500,000 $0 $0 $0 $500,000
Total Funding Sources $0 $1,000,000 $0 $0 $0 $1,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $844,300 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $25,300 $0 $0 $0
Total $0 $869,600 $0 $0 $0 $130,400 $1,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

71 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-06 (NEW CIP)
ASSESSMENT OF CATHODIC PROTECTION ANODE BEDS (FY 2027-2028) Project Category: A
Project Description:

There are a total of six (6) Impressed Current Cathodic Protection (ICCP) systems installed to protect the District’s steel transmission main and distribution mains from corrosion/rust. Additionally, there are three (3) ICCP systems installed to protect each of the District’s three 4-million-gallon steel water storage tanks.

Each ICCP is comprised of a rectifier (controllable DC power supply), anode beds(s) and connections from the rectifier negative output terminal to the pipeline or structure being protected.

Continuing maintenance of the cathodic protection system is required to ensure sufficient protection is maintained on the structures in order to prevent external corrosion while maintaining the water system infrastructure. District staff takes readings of the rectifiers on a monthly basis and annually tests the effectiveness of the existing cathodic protection system throughout the distribution system, replacing and adjusting the levels of the rectifiers as necessary. An assessment of the cathodic protection systems was performed in 2006 by Corrpro, and determined that there was approximately 20 years of useful life left in the existing anode beds studied.

This project will provide a condition survey of the anode beds associated with each impressed current cathodic protection system and make recommendations for replacement as needed. Based on the improvements required by the survey, a construction budget will be identified, and a funding request will be brought back to the City Council.

Estimated Project Schedule:

Assessment: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $0 $500,000 $0 $0 $500,000
Total Funding Sources $0 $0 $500,000 $0 $0 $500,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $410,200 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $24,600 $0 $0
Total $0 $0 $434,800 $0 $0 $65,200 $500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

72 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-07 (NEW CIP)
WATER FACILITIES SEISMIC VULNERABILITY ASSESSMENT (FY 2027-2028) Project Category: A
Project Description:

This project will identify improvements needed at the Water Booster Pump Station located at the District’s Corporation Yard. The Water Booster Pump station houses four engines and pumps that are used to pump water from the District’s four storage tanks into the distribution system during periods of peak demand and to cycle the water in the storage tanks.

G&E Engineering Systems performed a seismic vulnerability assessment of the pump station, with a final report completed in September 2013. The identified improvements are underway as part of CIP 660 - Water Tank Improvements Project.

In the Water Master Plan prepared by HydroScience in May 2021, it was recommended that the District perform a seismic vulnerability assessment of its critical infrastructure every 10-15 years to maintain compliance with current seismic code regulations.

This project will provide for an updated seismic analysis of the building including recommendations for structural improvements required to meet standards at the time of the analysis. Based on the analysis, a construction budget will be identified, and any additional funding requests will be brought back to the City Council.

Estimated Project Schedule:

Preliminary Design and inspection: FY 2027-2028

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $0 $125,000 $0 $0 $125,000
Total Funding Sources $0 $0 $125,000 $0 $0 $125,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $107,200 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $6,400 $0 $0
Total $0 $0 $113,600 $0 $0 $11,400 $125,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

73 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-08 (NEW CIP)
TWO ENGINES AND PUMP REPLACEMENT AT WATER BOOSTER PUMP STATION (FY 2027-2028) Project Category: A
Project Description:

The Water Booster Pump Station houses six (6) pumps. Currently, there are two (2) electric powered motor driven pumps (installed in 2005), two (2) natural gas (with propane backup) powered engine driven pumps, and two (2) diesel powered engine driven pumps. Two (2) of the natural gas-powered engines and pumps were installed in 2018 and are operational. However, the two (2) diesel powered engine drive pumps are over 40 years old and past their useful life. Currently those two are not operational.

This project provides for the removal and replacement of the 2 non-functioning diesel powered engines/ pumps with 2 new electric powered motor/pumps to provide maximum operational flexibility and additional redundancy. The project will also include Supervisory Control and Data Acquisition (SCADA) system upgrades to match the existing set up.

Estimated Project Schedule:

Design: FY 2027-2028
Construction/Installation: 2028-2029

Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $0 $375,000 $600,000 $0 $975,000 Total Funding Sources $0 $0 $375,000 $600,000 $0 $975,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $307,700 $478,700 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $18,400 $43,000 $0
Total $0 $0 $326,100 $521,700 $0 $127,200 $975,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

74 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-09 (NEW CIP)
CHLORINE ANALYZERS AND AUTOFLUSHERS AT VARIOUS LOCATIONS (FY 2028-2029) Project Category: A
Project Description:

This project will address implementing long-term technology solutions for the water quality issues that Foster City experiences in winter months. This project provides for the design and construction of chlorine analyzers and automatic flushers throughout Foster City.

EMID purchases water treated with a disinfectant agent (chloramine) from the SFPUC. Chloramine disinfection is more environmentally friendly than other disinfectant options but presents operational challenges for distribution system operators. If chloramine is allowed to remain in the distribution system for a lengthy period, the disinfectant can degrade, reducing the chlorine residual, adversely affecting water quality.

Successful water conservation efforts over the past years have reduced water demand, and as a result, water is subject to “aging” in the distribution system. In the winter months, when irrigation use is down and water demands are low, staff has observed chlorine residuals falling to actionable levels, forcing staff to flush hydrants to stimulate water circulation to increase the disinfectant levels in the water system. In 2022, staff performed an experiment to determine if irrigating sports fields at the furthest reaches of the system would improve system-wide disinfection levels. In partnership with the Parks Department, irrigation of City parks in strategic areas of the water distribution system was increased. Initial results have shown that residuals have improved. More time is also needed to monitor and validate data following installation of mixers as part of (CIP 405-660) Water Tank Improvements project which will be complete by summer 2025.

This project will install automatic flushers and chlorine analyzers at various key locations throughout the City. Chlorine analyzers will measure the level of disinfectant (chlorine residual) in the water in areas where water aging has been observed. When set thresholds are reached, the analyzers will trigger the automatic flushers to flush water through the system until the chlorine residuals are back to a non- actionable level. The installation of chlorine analyzers and automatic flushers will save staff time required to flush water mainlines manually, also saving City funds in labor costs.

Estimated Project Schedule:

Design: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $0 $0 $700,000 $0 $700,000
Total Funding Sources $0 $0 $0 $700,000 $0 $700,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $558,500 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15 %
Inflation Escalation $0 $0 $0 $50,200 $0
Total $0 $0 $0 $608,700 $0 $91,300 $700,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

75 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-10 (NEW CIP)
EAST HILLSDALE BOULEVARD LOOP (FY 2028-2029)
Project Category: B
Project Description:

This project addresses completing a waterline loop along East Hillsdale Boulevard to connect two existing pipelines to facilitate the flow of water for both normal and emergency operations. The project is identified in the Water Distribution System Master Plan that was completed in 2020.

The work will consist of the installation of approximately 40 feet of 8-inch PVC pipe by connecting an existing 8-inch ACP pipeline with an existing 8-inch PVC pipeline, to improve the available fire flows in the area.

The project supports the District’s ongoing program to maintain and upgrade the water system to improve reliability and minimize service interruptions.

Estimated Project Timeline:

Design: FY 2028-2029
Construction: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $0 $0 $138,000 $0 $138,000
Total Funding Sources $0 $0 $0 $138,000 $0 $138,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $110,100 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $9,900 $0
Total $0 $0 $0 $120,000 $0 $18,000 $138,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

76 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WA-11 (NEW CIP)
LARGE WATER VALVE REPLACEMENT (FY 2029-2030)
Project Category: B
Project Description:

This project is part of the District’s ongoing program of maintaining and upgrading the water system through the installation of new valves, replacement of existing valves (8-inches and larger) and various improvements to the water system to improve reliability and minimize service impacts to customers.

Valves included on the replacement list are either leaking, no longer functioning properly, or have reached the end of their useful life. The valves are discovered primarily through testing during the water main / fire hydrant flushing program. Additional valves are added to the project by inspecting the system and identifying the need for additional isolation valves to provide more reliable service to customers.

This on-going program helps keep the water distribution system in good condition to allow the provision of reliable service to the community. The program may include strategic use of line-stop technologies to minimize water service interruptions to large blocks of customers during the construction period.

Estimated Project Schedule:

Design: FY 2029-2030
Construction: FY 2030-2031
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 405 - CIP - Water $0 $0 $0 $0 $1,000,000 $1,000,000 Total Funding Sources $0 $0 $0 $0 $1,000,000 $1,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $0 $776,500
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $0 $93,100
Total $0 $0 $0 $0 $869,600 $130,400 $1,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

77 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-01 (CIP 455-652)
WASTEWATER TREATMENT PLANT MASTER PLAN IMPROVEMENTS (FY 2015-2016) Project Category: A
Project Description:

The Clean Water Program (CWP) includes capital improvements to the San Mateo Wastewater Treatment Plant (WWTP) and San Mateo’s sanitary sewer collection system necessary to replace aging infrastructure and meet regulatory requirements.

In accordance with the percentages of ownership of the WWTP established in the JPA (as lead agency, San Mateo owns approximately 75 percent and EMID owns approximately 25 percent), EMID is only responsible for its proportionate share of the relevant work related to the Wastewater Treatment Plant Master Plan improvements. The estimated share of the WWTP costs for EMID is approximately $174 million dollars. To date, $162,519,482 has been encumbered for this multi-year project. Approximately, an additional $11.3 million is anticipated over the next 2 years as shown in the funding table at the end of this Project Description.

Encumbered:

FY 2015-2016 $5,931,000 FY 2016-2017 $10,984,000 FY 2017-2018 $12,345,628 FY 2018-2019 $8,680,985 FY 2019-2020 $4,563,622 FY 2020-2021 $8,315,581 FY 2021-2022 $52,558,950 FY 2022-2023 $39,784,663 FY 2023-2024 $11,129789 FY 2024-2025 $8,225,263 $162,519,482
Anticipated:

FY 2025-2026 through FY 2026-27 $11,317,319
Total Project Budget $173,836,801 In 2024 (year 10), the CWP continued to focus on the construction phase of the WWTP project to assist with full project delivery and execution of major improvement projects. Some notable accomplishments include the following:

WWTP Upgrade & Expansion Project
• Submitted the quarterly reports for Water Infrastructure Finance and Innovation Act (WIFIA) loan compliance.
• RHAA (Consultant) completed the final design for the WWTP interpretive signs. • WWTP Final Parcel Map to comply with right of way dedications was recorded with the County in April 2024.

GMP-1 (Site Preparation, Electrical and Storm Drain System Improvements for GMP3) • Continued project closeout.

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

78 GMP-2 (Foundations for GMP3)
• Project is closed out and NOC accepted.

GMP-3 (Nutrient Removal and Wet Weather Flow Management Upgrade and Expansion) • Completed all yard piping with the exception of the final connections of the force mains to the new headworks scheduled for early February 2025.
• Completed the Air Gap for the domestic water supply system. • Achieved Substantial Completion for the Administration Building. Continued coordination for Temporary Occupancy estimated in April 2025.
• Continued the installation of electrical and mechanical equipment in Areas 51, 52, 53, 55, 56, 64, and 70.
• Completed the installation of the canopy and tanks in Area 70 • Achieved Substantial Completion for the new Warehouse. Continued coordination for Temporary Occupancy.
• Continued the improvements to the Sodium Bisulfite System. • Continued the improvements to the Chlorine Contact Basins. • Completed the leak testing for all basins.
• Continued the improvements to the foul air system in the primary screens, grit chambers, and grit wash equipment in Area 51.
• Completed Area 52 ‘s primary clarifiers.
• Completed the installation of the Membrane Bioreactor Filters in September 2024. • Started site landscaping and hardscape improvements.
• Began on site paving and replacement of paving of Detroit Drive. • Project overall completion is scheduled for Fall 2025.

Immediate Action Project Package 2 – Improvements to the solids processes • Completed modifications to the new hopper’s sensors.
• Replaced the mitered piping and installed pipe supports for one of the cake pumps. • Working with the contractor to resolve time delay impact issues. • Completion of this project is scheduled for Summer 2025.

Immediate Action Project Package 3 – Improvements to the effluent pump station, site waste pump station, and sludge heating and recirculation piping
• Construction of the new Site Waste Pump Station, improvements to the Effluent Pump Station, Digester piping, Concrete structural repairs and the new HVAC system for the Solids Handling Building started and are progressing.
• Completion of this project is scheduled for Summer 2025.

Annual Major Components
• Digester Transfer Pump Improvements: Transfer pumps arrived on site in July 2024. VFDs are scheduled to arrive in January 2025. Completion of this project is scheduled for April 2025. • 3 Water Pumping and Ferric to Combined Sludge Improvements: Design is anticipated to be completed by early Summer 2025.
• Other AMC Packages: Biosolids and Energy Management Plan (Brown and Caldwell awarded contract to perform study. Study estimated completion is 2026); DAFT Corrosion Improvements (Carollo awarded contract to perform study. Study estimated completion is Spring 2025); Digester 1 Improvements (pending results of Biosolids study); Centrifuge and Centrifuge Feed Pump Replacement (planning phase); Solids Handling Systems I&C Improvements (planning phase) In 2025 (Year 11), the CWP will continue to focus on full project delivery and execution of major improvement projects. Key Year 11 program activities include the following:

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

79 • Program administration, program controls, economic management, document management, oversight of 3rd party construction management teams, environmental permitting support, and public outreach.
• Continue closeout of WWTP Upgrade and Expansion Project (GMP 1). • Project management, construction management, and inspection for the following projects:
◦ WWTP Upgrade and Expansion Project (GMP 3)
▪ Immediate Action Project 2
▪ Immediate Action Project 3
▪ WWTP Annual Major Components Projects
• Continue project management for the Construction Manager at Risk (CMAR) (Sundt). • Obtain Final Certificate of Occupancy of the Administration Building and Warehouse. • Complete improvements to the Sodium Hypochlorite and Sodium Bisulfate Systems. • Complete the installation of electrical, mechanical equipment and piping in Areas 51 (Headworks) 53 (Bio-Actiflo); 55 (BNR); 56 (MBR); and 70 (Chemical Area). • Complete construction of the on-site improvements including, landscaping, pavement and security fencing.
• Begin conversions of the existing Aeration basins to Flow Equalization Basins. • Plant start-up
◦ Complete the training of the WWTP staff on the new processes. ◦ Complete the clean water loop testing and start-up of the new processes. ◦ Seed the new processes of the WWTP.
• Complete improvements to the Solids Handling Building (IAP II), including the piping and Sludge Cake Pump No. 1.
• Complete time extension negotiations with IAP II Contractor (Myers). • Continue closeout of IAP II.
• Continue construction and complete closeout of IAP III. • Continue completion of AMC projects.

Start-up, commissioning and seeding of new treatment facilities is targeted to be begin in May 2025 followed by the operation of new processes in July 2025. Final completion of the WWTP is anticipated in April 2026.

Erler & Kalinowski, Inc. is providing technical support services for EMID. EMID Specific expenses, (such as EKI, and legal support) are included in the 10-year funding model and are being funded through the enterprise fund and not bond proceeds.

Estimated Project Schedule:

Design: Complete
Construction: Ongoing through FY 2025-2026
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $9,959,516 $1,357,803 $0 $0 $0 $11,317,319 Total Funding Sources $9,959,516 $1,357,803 $0 $0 $0 $11,317,319 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $9,959,516 $1,357,803 $0 $0 $0
Inflation % 0 % — % — % 9 % 12 % — %
Inflation Escalation $0 $0 $0 $0 $0
Total $9,959,516 $1,357,803 $0 $0 $0 $0 $11,317,319

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

80 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-02 (CIP 455-705)
EMERGENCY GENERATOR REPLACEMENTS (FY 2021-2022)
Project Category: A
Project Description:

The project addresses the replacement of certain emergency generators and automatic transfer switches that are located at 10 of the District’s wastewater lift stations and are at the end of their useful lives.

Emergency generators power lift stations when power from PG&E is interrupted or shut down. The automatic transfer switch senses when PG&E power is interrupted and causes the emergency generator to turn on.

The 48 lift stations, as parts of the EMID sanitary sewer collection system, pump and convey sewage to receiving manholes at higher elevations. Emergency generators are located at EMID’s 14 major lift stations. Without emergency generators, in the event of a power outage, lift stations could fill with sewage and possibly overflow.

This project addresses replacing the emergency generator and automatic transfer switch (ATS) at Lift Stations 10, 12, 14, 15, 16, 26, 29, 40 and 59 and the emergency generator only at Lift Stations 22. $1,415,000.00 in funding has been appropriated from the equipment replacement fund for this project.

In August 2022, the District Board approved a professional services agreement with Freyer & Lauretta, Inc. (F&L), for the design of three critical and complex generator replacements at LS 22, 29, and 59. A basis of design report was prepared to evaluate generator sizing, pad sizing, and siting for the generators at these three lift stations, of which LS 29 requires additional work including relocation of the generator system from inside the Bank of America Building to within an easement on the property along Edgewater Blvd and permanent removal of an underground fuel tank.

As part of the analysis, it was determined that the estimated lead time for the new generator systems and accompanying ATSs will be 42 to 60 weeks. To minimize project delays, a pre-purchase package for the generators was released for bid in March 2024 and on August 19, 2024, the City Council approved the purchase agreement with Bay City Electric Works. While the systems are on order, F&L will continue to complete the preparation of the construction documents. An amendment to the existing contract with F&L was approved by the City Council on November 4, 2024, to include the design of the remaining 7 generators in the design documents. Staff intends to bid the 3 priority generators in Winter 2025 and the remaining 7 generators sometime in summer 2026.

Estimated Project Schedule:

Design: FY 2023-2024 to FY 2025-2026
Construction: FY 2026-2027 to FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $2,000,000 $0 $0 $0 $0 $2,000,000 Total Funding Sources $2,000,000 $0 $0 $0 $0 $2,000,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $1,739,100 $0 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $0 $0
Total $1,739,100 $0 $0 $0 $0 $260,900 $2,000,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

81 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-03 (CIP 455-710)
SHELL BRIDGE SANITARY SEWER FORCE MAIN REHABILITATION (FY 2022-2023) Project Category: A
Project Description:

This project will address the rehabilitation or replacement of the 16” cast iron force main attached to the Shell Bridge. In February 2021, repairs were completed on a 12-inch diameter hole located on the top side of the pipe, that was identified during a routine maintenance inspection. At the same time the air release valve located on the force main at the high point on the bridge was also replaced.

The force main was originally constructed in the 1960s. The force main is a critical facility which delivers over 500,000 gallons of sewage (approximately one fifth of the wastewater generated in the District) daily to the San Mateo Wastewater Treatment Plant. The localized failure of the pipe and air release valve is due to the corrosive environment of wastewater and repeated exposure to hydrogen sulfide gas. Other portions of this main may have similarly deteriorated and be vulnerable to failure.

The City retained BKF Engineers to perform a preliminary condition assessment of the pipeline. In May 2023, wall-thickness testing along the pipe span was performed and a report was prepared summarizing the investigation and current condition of the pipe. The pipe’s current condition is adequate for lining, which would allow for a cost-effective rehabilitation that would extend the pipe’s useful life significantly.

The City Council awarded a contract to BKF to perform a feasibility study at its meeting on January 21, 2025 to assess the feasibility of lining the existing pipe. If lining is feasible, the City will work to prepare design drawings for rehabilitating the pipe. If it is not feasible, the City will look further into a full replacement of the pipe.

Estimated Project Schedule:

Pipeline Investigation: FY2023-2024
Lining Feasibility Study: FY2024-2025
Design: FY2025-2026
Construction: FY2025-2026 through FY 2026-2027
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $500,000 $0 $0 $0 $0 $500,000 Total Funding Sources $500,000 $0 $0 $0 $0 $500,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $434,800 $0 $0 $0 $0
Inflation % 0 % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $0 $0
Total $434,800 $0 $0 $0 $0 $65,200 $500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

82 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-04 (CIP 455-719)
SANITARY SEWER LIFT STATION IMPROVEMENTS - PHASE 6 (FY 2023-2024) Project Category: A
Project Description:

This project is part of a multi-phase program started in 2000 to rehabilitate EMID's sanitary sewer lift stations. The lift station improvement projects take place every four to five years.

Lift stations pump wastewater from the low points in the collection system to manholes at higher elevations. The lift station improvement projects include preventative maintenance and upgrades to improve the reliability, durability, and sustainability of the lift stations. Phase 6 projects address deficiencies at Lift Stations 6, 9, 11, 13, 22, 29, 42 and 43. Lift station improvements generally include repairing the interior wet wells; replacing critical components, and electrical improvements including installation of additional systems to remotely monitor and control the lift stations. Design is anticipated to begin in FY25-26.

Estimated Project Schedule:

Design: FY 2025-2026
Construction: FY 2026-2027
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $7,900,000 $1,000,000 $0 $0 $0 $8,900,000 Total Funding Sources $7,900,000 $1,000,000 $0 $0 $0 $8,900,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $6,869,600 $844,300 $0 $0 $0
Inflation % — % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $25,300 $0 $0 $0
Total $6,869,600 $869,600 $0 $0 $0 $1,160,800 $8,900,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

83 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-05 (NEW CIP)
SANITARY SEWER MANHOLE REPLACEMENTS (FY 2026-2027)
Project Category: A
Project Description:

The project is a continuation of the District's on-going program to repair and replace elements of the sanitary sewer collection system to extend the useful life of the system. The project is comprised of replacing 16 manholes identified in the Wastewater Collection System Master Plan and by staff as a part of routine maintenance.

Replacement of manholes is typically required due to: (1) the settlement of manholes which adversely affects the connecting pipes and sewage flows; (2) the deterioration of the manhole due to the corrosive gas produced by sewage; and/or (3) the scouring of receiving manholes at the end of a force main, due to the velocity of wastewater pumped from the lift station via the force main pipeline.

These manholes operate as force main collectors, receiving wastewater flow from various lift stations.

During the condition assessment performed as part of the Wastewater Master Plan, Manholes 29-07, 18-01, 16-17, 14-02, 22-18, 22-19, 37-11, 29-31, 10-01, and 12-02 were witnessed to operate under turbulent conditions during force main discharge cycles. Additionally, staff has identified six (6) manholes located on trunk lines on East Hillsdale Boulevard, a major boulevard, and within busy intersections, adding complexity to their inspection and replacement: 29-08, 29-09, 29-10, 29-11, 29-12, and 29-13.

Replacement of these manholes and the intercepting piping will enhance station reliability and public safety.

Estimated Project Schedule:

Design: FY 2026-2027
Construction: FY 2027-2028
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $0 $500,000 $2,000,000 $0 $0 $2,500,000 Total Funding Sources $0 $500,000 $2,000,000 $0 $0 $2,500,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $422,200 $1,640,700 $0 $0
Inflation % — % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $12,600 $98,400 $0 $0
Total $0 $434,800 $1,739,100 $0 $0 $326,100 $2,500,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

84 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-06 (NEW CIP)
OVERFLOW, REDUNDANCY, BYPASSING AND BACKUP POWER STUDY (FY 2027-2028) Project Category: B
Project Description:

Most EMID lift stations were constructed between the mid-1960s and the mid-1970s. The criticality of each existing lift station varies depending upon its relative position within the network, the expected flow rate of influent sewage, and the station’s existing structural and mechanical capacities. Various lift stations throughout the City are equipped with gravity overflow facilities or emergency generators to establish collection system redundancy and to prevent sanitary sewer overflows.

This project will provide for a complete system analysis to determine areas within the District’s collection system that are currently unprotected or minimally protected by existing overflow, redundancy, bypassing, and backup power features as identified in the Wastewater Collection System Master Plan completed in 2020. This analysis will take into consideration existing gravity overflow piping systems; permanent and portable emergency generators and connections and whether generator fuel capacity meets the minimum 12-hour run time requirement; and bypassing connections to identify collection system vulnerabilities in the event of a power outage and under wet-weather conditions.

This analysis will drive the prioritization of further redundancy measures and develop a cost/benefit analysis of those improvements. A placeholder for construction has been included. Based on the analysis, a construction budget will be refined and any additional funding required for construction will be brought back to the District Board.

Estimated Project Schedule:

Study: FY 2027-2028
Design/Construction: TBD
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $0 $0 $100,000 $1,000,000 $0 $1,100,000 Total Funding Sources $0 $0 $100,000 $1,000,000 $0 $1,100,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $85,800 $834,100 $0
Inflation % — % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $5,100 $75,000 $0
Total $0 $0 $90,900 $909,100 $0 $100,000 $1,100,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

85 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-07 (NEW CIP)
WASTEWATER MASTER PLAN (FY 2028-2029)
Project Category: B
Project Description:

The District’s wastewater infrastructure system was constructed in the early 1960’s. The wastewater system consists of nearly 62 miles of gravity sewer lines, 10 miles of force mains, and 49 pump stations.

All sewage is ultimately conveyed to the San Mateo Wastewater Treatment Plant, which is jointly owned by EMID and the City of San Mateo through a Joint Powers Agreement (JPA).

In 1993, Harris Consultants, Inc. completed the Sewer Force Main Master Plan and Inspection Program report for the District. The report indicated that most of the force mains were in better-than-expected condition. In 2020, HydroScience completed the Wastewater Collection System Master Plan. The report generated a prioritized 20-Year Capital Improvement Plan and funding approach, which identified projects to address the District’s most critical lift stations and collection system “hot spots” for rehabilitation.

The proposed Wastewater Collection System Master Plan Study will include an evaluation of the overall wastewater system. The general scope of work includes data collection and review, flow monitoring, hydraulic model development, system performance evaluation and improvement needs, condition assessment and rehabilitation/replacement program, seismic vulnerability assessment, review of the District’s General Plan for future growth, and recommendations for 20-Year Capital Improvement Plan Development,.

The District currently has an active Capital Improvement Program (CIP) to rehabilitate its infrastructure.

By reviewing and analyzing existing system capacity and infrastructure to develop an analytical planning document, the District will have a means to identify deficiencies and prioritize improvements within the collection system.

Estimated Project Schedule:

Master Plan Study: FY 2028-2029
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $0 $0 $0 $600,000 $0 $600,000 Total Funding Sources $0 $0 $0 $600,000 $0 $600,000
Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $500,500 $0
Inflation % — % 3 % 6 % 9 % 12 % 10.00 %
Inflation Escalation $0 $0 $0 $45,000 $0
Total $0 $0 $0 $545,500 $0 $54,500 $600,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

86 CIP PROJECT DESCRIPTION FOR FIVE-YEAR FINANCIAL PLAN WW-08 (NEW CIP)
SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE 7 (FY 2028-2029) Project Category: A
Project Description:

The project is part of a multi-phase program started in 2000 to rehabilitate EMID's sanitary sewer lift stations. The lift station improvement projects take place every four to five years.

The projects include preventative maintenance and upgrades to improve the reliability, durability, and sustainability of the lift stations. Lift stations in the District pump wastewater from the low points in the collection system to manholes at higher elevations.

The Phase 7 project addresses deficiencies at Lift Stations 36, 37, 38, and 39. The replacement of these lift stations will effectively remove the low capacity, capsule style, Gorman-Rupp dry deck lift stations which are mechanically unique and difficult to maintain for District maintenance staff. Removal of these outdated fiberglass dry deck stations will complete the conversion of all District lift stations to rail extraction, submersible pump style lift stations. Finalization of this conversion will establish uniformity across the District and ease the maintenance complexity for District staff. The project is expected to be a comprehensive replacement of all lift station features except the precast wet well, which will be equipped with a new traffic rated access hatch and concrete top.

Estimated Project Schedule:

Design: FY 2028-2029
Construction: FY 2029-2030
Funding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 Total Fund 455 - CIP - Wastewater $0 $0 $0 $3,200,000 $3,000,000 $6,200,000 Total Funding Sources $0 $0 $0 $3,200,000 $3,000,000 $6,200,000 Expenditures Categories 2025-26 2026-27 2027-28 2028-29 2029-30 Contingency Total Estimated Project Costs $0 $0 $0 $2,552,900 $2,329,200
Inflation % — % 3 % 6 % 9 % 12 % 15.00 %
Inflation Escalation $0 $0 $0 $229,700 $279,500
Total $0 $0 $0 $2,782,600 $2,608,700 $808,700 $6,200,000

4.1 Attachment 1 - Proposed Capital Improvement Program FY 2025-2026 to FY 2029-2030

87 5
8 7
DATE: March 24, 2025

TO: Mayor and Members of the City Council
VIA: Stefan Chatwin, City Manager
Marlene Subhashini, Assistant City Manager

FROM: Andrew Brozyna, Public Works Director/City Engineer Derek Schweigart, Parks and Recreation Director
Nate Cruz, Finance Director
DEPARTMENT: Public Works
Parks and Recreation
Finance
SUBJECT: FIFTEEN YEAR GENERAL FUND CAPITAL IMPROVEMENT

PROJECTS PROGRAM AND FUNDING PLAN FOR THE
PREPARATION OF THE CITY’S FISCAL YEAR 2025-2026

BUDGET AND FIVE-YEAR FINANCIAL PLAN

RECOMMENDATION
It is recommended that the City Council receive and accept the City’s 15-year General Fund Capital Improvement Projects Program and its funding plan for the preparation of the City’s Fiscal Year 2025-2026 budget and 5-year financial plan.

EXECUTIVE SUMMARY
In 2010, the City Council approved a funding strategy for its capital improvement projects (CIP) in the form of a Long-Term CIP Funding program. The current model uses a 15- year capital expenditure forecast and funds those forecasted needs on an annual basis.

The City also generally refrains from using debt to finance its capital projects unless it is necessary because of the magnitude of the project (e.g., CIP 327-657 Levee Protection Planning and Improvements Project).

In FY 24-25, the CIP Fund resources yielded approximately $12.85 million of estimated undesignated Reserve Balance (inclusive of a $2 million emergency reserve). Based on the annual forecasted CIP costs in the 15-year CIP for FY 24-25 and the $12.85 million

4.2 4.2 Staff Report

88 5
8 7
reserve balance, annual General Fund transfers of $5.75 million to the City CIP Fund was identified to support these City CIP projects for the City 5-year Financial Plan.

However, the current accumulation of CIP Fund resources is expected to yield an approximate $25.45 million of undesignated Reserve Balance (almost double of FY 24- 25 reserve balance) by June 30, 2025. This is primarily due to the $5M that was reserved for the levee project that the City didn't spend towards the levee project. Based on the annual forecasted CIP costs in the 15-year CIP and the undesignated Reserve Balance of $24.5 million as of June 30, 2025, staff is seeking Council direction regarding continuing to hold the annual General Fund transfers at $5.75 million to the City CIP Fund or reducing it to $4.9 million to support these City CIP projects for the City 5-year Financial Plan.

To prepare the recommended CIP, City staff performed an annual long-term review and made modifications, as appropriate, to the funding amounts and timing of future projects.

Projects have been analyzed in primarily two categories based on their separate funding sources:
•City Capital Projects Fund (City CIP Fund) – includes projects such as bridges, lagoon structures, levees, parks, and buildings, which are funded from General Fund sources.
•Streets-Related Funding – includes streets and traffic signal projects, which are funded first through sources from Measure A, Gas Tax §2103, Measure M, SB 1 (Road Maintenance and Rehabilitation Account), and Measure W funds.

The analysis for City CIP Fund projects and Street-Related projects takes into consideration the existing fund balance resources projected to be available as of June 30, 2025, based on the latest estimates of CIP activity through the end of the current fiscal year and projected revenues available from applicable revenue sources. The analysis for the City CIP Fund ensures that the reserve balances stay above the minimum $2 million emergency reserve level, while the Streets-Related Funding analysis has no established minimum reserve level, since City CIP Funds can be drawn for those purposes if needed.

Total City CIP projects over the 15-year time horizon are increasing from $107.40 million to $108.37 million with parks projects accounting for $39.84 million of the total. These park projects include $2.52 million in ancillary funding from Park In Lieu and Park Facility Infrastructure fees and $2.2 million from the City’s Internal Service Funds. Street projects total $38.43 million, of which $35.24 million are from Special Revenue Funds and $0.48 million is from the Equipment Replacement Fund. Storm Water and Lagoon projects total $24 million from the City CIP fund.

The Streets-Related Funding plan, which is based on a Pavement Management Technical Assistance Program (P-TAP) analysis, includes a $2 million annual expenditure over the 15-year plan due to the rising cost of projects and bringing the City’s current 79 Pavement Condition Index (PCI) to 83 and maintain it at that level.

4.2 4.2 Staff Report

89 5
8 7

BACKGROUND
The City Council has made it a priority to ensure that the City’s infrastructure is well- maintained on an ongoing basis. Such proactive maintenance, repair, and replacement of infrastructure ensures that key systems are operating at peak levels, promotes safety, provides for a continuity of services to the community, maintains property values, and maintains the quality of life that the community has come to expect.

When the City was newer, capital improvement efforts focused heavily on the construction of new infrastructure. Now that the City is at build-out and over 50 years old, there has been a transition from new construction to proactive preventative infrastructure maintenance, which affects the types of projects and how those future CIP programs are funded to prioritize minimizing the potential for emergency repair situations.

Maintenance vs. CIP
Managing the City’s infrastructure manifests itself in the following ways:
•Proactive Maintenance – The preventative maintenance efforts of Public Works and Parks Maintenance crews on an ongoing basis reduce the overall future costs of City infrastructure. These ongoing operating costs offset the magnitude and expense of future infrastructure replacement projects. •New Infrastructure or Significant Infrastructure Replacement Projects – In some cases, there may be CIP projects that would create new infrastructure or projects that are considered so significant in nature that the entire infrastructure is replaced or built anew.
•Recurring Capital Improvement Projects – Some CIPs are considered “recurring” and amount to significant repair work, such as street overlays, park turf replacement, and levee maintenance. The underlying infrastructure is still usable, but these larger maintenance efforts help extend the useful lives of that infrastructure.

The first category, Proactive Maintenance Activities, is budgeted in the Public Works and Parks and Recreation Departments' annual operating budgets in the General Fund.

Projects in the third category, Recurring Capital Improvement Projects, are funded from either recurring revenue sources (e.g., Measure A, Gas Tax, Measure M, SB1, Measure W), or are otherwise funded from the City’s General Fund resources as transfers out to the City CIP Fund.

Exclusion of Enterprise Fund Assets

4.2 4.2 Staff Report

90 5
8 7
This report excludes the long-term CIP funding of Water and Wastewater system related projects for two primary reasons: (1) such projects are analyzed as part of the 15-year rate model process for each enterprise fund; and (2) the District Board can include such replacements when establishing water and wastewater rates. A separate report addresses the Water and Wastewater CIPs and capital funding.

ANALYSIS
Approach
Staff has updated the Long-Term CIP Funding analysis considering current maintenance efforts, assessment of replacement requirements, and replacement costs in the following seven (7) categories:
•Streets – including pavement management efforts (e.g., arterial and collector street overlays) and sidewalks, curbs, and gutters
•Bridges – including bridges and approaches owned by the City, and only bridge approaches for overcrossings not owned by the City (i.e., E. Hillsdale Boulevard/Marina Lagoon overcrossing, Foster City Boulevard/92 Overpass, Vintage Park/92 Overpass)
•Lagoon and Storm Water Structures – including bulkheads, dredging, boat ramps, culverts, inlets, storm water pumps, and the pump station building •Levee – including the levee infrastructure
•Parks – Park infrastructure including hardscapes, landscaping, restrooms, lighting, irrigation systems, and permanent park structures such as tennis and basketball courts. It also includes the medians and cul-de-sacs maintained throughout the City
•Street Lights, Traffic Signal, and Crosswalk Systems – physical light and signal structures, controllers, and systems
•Buildings – including the Government Center campus, Recreation Center campus, and the Corporation Yard (structures associated with parks are included in Parks above)
15-Year CIP Capital Improvement Projects Program and Key Changes from the Prior Year (Attachment 4)
The Capital Improvement Plan has been updated to best reflect the recommended projects needed in the 15-year term. Some key changes include the addition of new projects not previously included in the plan, removal of projects that are not anticipated to require additional funding in future years, and cost updates based on the significant inflationary increases currently being observed in the construction market.

Detailed information, summaries and calculations and listings of the 15-year projects are found in Attachments 1 to 8 to this report.

Assumptions

4.2 4.2 Staff Report

91 5
8 7
Funding Sources
In each category, initial assumptions were made as to the funding sources of various assets. Funding asset components from other sources (e.g. developer fees) was excluded from the analysis. If an asset replacement value was considered so significant that the only effective financing option was to use debt financing (e.g., replacement of City Hall or the voter approved G.O. Bond funding of the Levee Improvement Project), those assets were also excluded. Assets excluded in each category (including the assumed alternate funding source in parentheses) were as follows:
•Streets – LED signal faces and signal controllers, pedestrian LED and appurtenances, backlit street signs (ERF), and traffic improvements as part of the Multi-Project Traffic Improvements Project (fully funded by developers of the respective projects)
•Bridges – None
•Lagoon – Lagoon itself, shorelines, rip-rap, and retaining walls (debt financing); pump stations, gates, trash racks and flappers (Equipment Replacement Fund) •Levee – Complete rebuild or raising of Levee infrastructure to address sea level rise (debt financing)
•Parks – Complete park rebuilds “from the ground up” (potential debt financing) •Buildings – Minor replacement projects (Building Maintenance Fund) Expenditure Assumptions
Replacement values were reviewed and updated from the prior year’s analysis as necessary. All values were expressed in terms of future replacement, taking into consideration factors such as inflation, project size, timing and construction contingency funding.

Revenue Assumptions
Key revenue assumptions that affect funding sources are as follows:

City Capital Projects Funding (Attachment 1)
•Park-In-Lieu – $2.05 million is reserved from the Park-In-Lieu Fund Balance for improvements that will be recommended in the Park System Master Plan. •Park Facilities Impact Fees - $467,000 is designated for the Recreation Center Rebuild from Park Facilities Infrastructure Fees.
•Donations from Youth Sports Groups – $105,000 of donation reimbursements are included in revenue estimates over the next five years from various sports groups for the Sea Cloud Park projects are included in the 15-year CIP plan. •Grants – The Public Works and Parks Department routinely seek grants to supplement funding of its projects, and Public Works staff have been actively engaged in discussions with the City’s lobbyist to identify funding sources and eligible projects for funding. Until grant funds are identified for various projects

4.2 4.2 Staff Report

92 5
8 7
and are reasonably expected to be available, additional grant funds are excluded from this analysis.

Streets-Related Funding (Attachment 2)
•Measure A – This is a sales tax-based allocation. A revenue projection of $918,600 is included in FY 2025-2026 with 4% annual growth during the first five years and 3% annual growth thereafter.
•Gas Tax Section 2103 Funding – Revised estimates are based on the Gas Tax Swap legislation approved by the State in 2010, which swapped Prop 42 funding into the Gas Tax funding stream. Gas Tax (Sections 2105-2107) revenues are used to fund Public Works street maintenance operations, but Section 2103 funds must be used for roadway improvements and other transportation initiatives. Revenues for FY 2025-2026 are estimated to be $306,554 based on forecasts from the State and projected to increase 2.5% per year for the first five years and 2.0% annually thereafter. •Measure M – This measure, passed by voters in San Mateo County in November 2010, implemented a $10 fee added to vehicle license registrations of County residents for 25 years starting April 2011. Staff is projecting to receive $126,600 in FY 2025-2026 and an additional 2% annually thereafter.

Funds are administered by C/CAG and are provided on a reimbursement- basis. These funds may be used for such things as pavement resurfacing, pothole repair, signs and striping, traffic signals, street sweeping, storm-inlet cleaning, and local shuttles.
•SB 1 (Road Maintenance and Rehabilitation Account) – In 2017, the State passed the Road Repair and Accountability Act providing funding for local streets, roads, and other transportation uses. The funding was through a 12- cent per gallon increase to the gasoline excise tax and an additional 20-cent per gallon increase to the diesel excise tax, both of which took effect on November 1, 2017. An additional vehicle registration tax called “Transportation Improvement Fee” with rates based on the value of motor vehicles took effect on January 1, 2018. FY 2025-2026 SB1 revenues to the City are estimated at $883,812 with projected annual growth of 5% for the first five years of the plan and 4% thereafter.
•Measure W – Measure W was passed by the voters of San Mateo County in November 2018. The measure took effect on July 2019 and is estimated to bring approximately $451,000 to Foster City in FY 2025-2026 with projected annual growth of 5% for the first five years, and 4% thereafter and can be used to support traffic and traffic congestion relief related initiatives. •Transportation Impact Mitigation Fees – Development fees related to transportation are programmed into the CIP in the years in which they are anticipated to be received. Estimated amounts and timing are provided by the Community Development Department.
•Grants – Until such time grant funds are identified for various projects and are reasonably expected to be available, grant revenues are excluded from this analysis.

4.2 4.2 Staff Report

93 5
8 7
15-Year Cash Flow Methodology
Foster City uses a funding methodology that looks at the total replacement value of assets which are scheduled to be replaced in the next 15-years and then averages the replacement amount over the 15-year window. The funding amounts are then compared to the available fund balance reserves and anticipated future revenues.

For the City CIP Fund, a minimum emergency reserve requirement for capital improvement projects is $2 million. There is no reserve requirement for Street-Related Funding. The analysis also takes into consideration the projected Fund Balance in the Park-In-Lieu Fund to ensure that those funds are only spent on projects related to new parks or projects that increase the capacity of park amenities.

To the extent that there are not sufficient resources available from reserves and projected future revenues to maintain minimum reserves in the respected funding analysis, a transfer is identified from the City’s General Fund to ensure that the minimum fund balance reserve is met each year.

City Capital Projects Funding
Public Works, in consultation with the Parks and Recreation Department, prepared the 15-year project list considering replacement value, timing, and necessity. As indicated in the attached analysis, City staff is seeking Council direction on the annual General Fund transfers to the City Capital Projects Fund throughout the 15-Year CIP (FY 2025- 2026 to FY 2039-2040. The City will continue to maintain the minimum $2.0 million reserve and provide capacity for additional CIP projects.

CEQA
Not Applicable

FISCAL ANALYSIS
Based on Council direction, the CIP funding plan will include either a $5.75 million or $4.9 million of annual transfers from the General Fund to the City CIP Fund for the preparation of the City’s Fiscal Year 2025-2026 budget and 5-year financial plan.

CITY COUNCIL VISION, MISSION, AND VALUE/PRIORITY AREA
Sustainability
ATTACHMENTS:

Attachment 1 - 15-Year Fund Balance Analysis
Attachment 2 - Streets Related Funding
Attachment 3 - 15-Year CIP Costs
Attachment 4 - 15-Year CIP Comparison
Attachment 5 - Summary of Funding Sources and City CIP Fund Balance

4.2 4.2 Staff Report

94 5
8 7
Attachment 6 - Capital Improvement Program Fiscal Year 2025-26 through Fiscal Year 2039-40 (Buildings, Storm Water and Lagoon Projects)
Attachment 7 - Capital Improvement Program Fiscal Year 2025-26 through Fiscal Year 2039-40 (Parks Projects)
Attachment 8 - Capital Improvement Program Fiscal Year 2025-26 through Fiscal Year 2039-40 (Street Projects)

4.2 4.2 Staff Report

95 Long-Range CIP Planning Attachment 1 - 15 Year Fund Balance Analysis 15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040 City Capital Investment Funding Funding Strategy
15-Year Fund Balance Analysis
Fund Balance Analysis - 15-Year Forecast (FYE 6/30) Total 2026
25,445,751
(8,467,000) (11,635,000) (18,350,000)
2027
23,619,314
2028
17,760,564
2029
10,863,298
(5,725,000)
2030
13,574,548
(8,041,000)
2031
11,718,548
(8,894,600)
2032
8,573,948
(290,000)
2033
14,323,948
(6,294,800)
2034
14,254,148
(1,147,000)
2035
19,057,148
(929,200)
2036
24,487,948
(600,000)
2037
29,637,948
(2,068,000)
2038
34,139,948
(200,000)
2039
39,889,948
-
2040
45,639,948
(980,000)
Cash Flow
25,445,751
(73,621,600)
-
Beginning Fund Balance
Less: Capital Improvement Expenditures from 15-Year Forecast Add: Funding Available from Other Non-General Fund Sources Reimbursements from Youth Sports Groups (1)
Parks in Lieu Fees (2)
Park Facilities Impact Fees (2)
Equipment Replacement Fund (3)
26,250
-
864,313
26,250
-
-
-
-
26,250
-
4,791,484
385,000
500,000
10,658,000
26,250
2,050,000
-
110,000
500,000
10,658,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
105,000
- 2,050,000
5,655,797
2,205,000
3,300,000
159,870,000
-
435,000
-
-
290,000
-
-
200,000
-
-
-
425,000
50,000
10,658,000
360,000
250,000
10,658,000
Building Maintenance Fund (4) 820,000
10,658,000
200,000
10,658,000
980,000
10,658,000Add: Annual Long-Term CIP Funding from City General Fund (A) Increase (Decrease) to Annual Long-Term CIP Funding from City General Fund due to Excess / Deficiency of Reserves (B) Ending Fund Balance
Less Minimum Fund Balance Requirement (5)
Excess Fund Balance Over Minimum Requirement
10,658,000 10,658,000 10,658,000 10,658,000 10,658,000 10,658,000 10,658,000 10,658,000 (4,908,000)
23,619,314
2,000,000
(4,908,000)
17,760,564
2,000,000
(4,908,000)
10,863,298
2,000,000
8,863,298
(4,908,000)
13,574,548
2,000,000
(4,908,000)
11,718,548
2,000,000
9,718,548
(4,908,000)
8,573,948
2,000,000
6,573,948
(4,908,000)
14,323,948
2,000,000
(4,908,000)
14,254,148
2,000,000
(4,908,000)
19,057,148
2,000,000
(4,908,000)
24,487,948
2,000,000
(4,908,000)
29,637,948
2,000,000
(4,908,000)
34,139,948
2,000,000
(4,908,000)
39,889,948
2,000,000
(4,908,000)
45,639,948
2,000,000
(4,908,000)
51,389,948
2,000,000
(73,620,000)
51,389,948
2,000,000
21,619,314 15,760,564 11,574,548 12,323,948 12,254,148 17,057,148 22,487,948 27,637,948 32,139,948 37,889,948 43,639,948 49,389,948 49,389,948 Net Annual Long-Term CIP Funding from City General Fund (A) - (B) 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000 86,250,000 This analysis projects fund balance levels over the 15-year period to determine:
(A) - That there are sufficient funds to meet cash flow requirements in future years (B) - The extent to which excess cash is being reserved FOOTNOTES:
(1) - The Parks and Recreation Department anticipates payments over the next 5 years will be forthcoming from Youth Sports Groups for reimbursement of the Sea Cloud Synthetic Turf Fields (CIP 301-659).
(2) - Impact Fees are forecasted using conservatively probable development schedules. (3) - Funding for various Parks projects include parks/playground equipment funded from the Equipment Replacement Internal Service Fund. (4) - Funding for Building Maintenance projects is from the Building Maintenance Internal Service Fund. (5) - Per City Council Policy, the minimum fund balance in the City CIP fund is $2 million.

Q:\PubWorks\BUDGET\Budget 2025-2026\CIP\2025-03-24 Long Term CIP\CITY Long-Term CIP\Copy of CIP 15yr forecast CITY Attachments 2025.03.06 - al_md

4.2 Attachment 1 - 15-Year Fund Balance Analysis

96 City of Foster City Attachment 2 - Streets Related Funding Long-Range CIP Planning
15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040 Streets-Related Funding Funding Strategy
15-Year Fund Balance Analysis
Fund Balance Analysis - 15-Year Forecast (FYE 6/30) Total 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Cash Flow Beginning Fund Balance (1) 5,260,746 6,257,718 3,122,918 4,041,054 5,084,054 6,256,654 7,535,903 8,925,554 10,429,498 12,051,767 13,796,538 15,668,144 17,671,074 19,809,983 12,051,767 5,260,746 Less: Capital Improvement Expenditures from 15-Year
Forecast (2,000,000) (5,935,000) (2,810,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (2,000,000) (34,745,000) Add: Funding Available from Other Non-General Fund
Sources (2) -
Measure A Revenues 918,600 955,300 993,500 1,033,200 1,074,500 1,106,735 1,139,937 1,174,135 1,209,359 1,245,640 1,283,009 1,321,499 1,361,144 1,401,979 1,444,038 17,662,576 Gas Tax 2103 Revenues 306,554 314,200 322,100 330,200 338,500 345,270 352,175 359,219 366,403 373,731 381,206 388,830 396,607 404,539 412,630 5,392,164 Measure M Revenues 126,600 129,100 131,700 134,300 137,000 139,740 142,535 145,385 148,293 151,259 154,284 157,370 160,517 163,728 167,002 2,188,814 SB1 Road Maintenance and Rehabilitation Account
Revenues 883,812 928,000 974,400 1,023,100 1,074,300 1,117,272 1,161,963 1,208,441 1,256,779 1,307,050 1,359,332 1,413,706 1,470,254 1,529,064 1,590,226 18,297,699 Measure W Revenues 451,000 473,600 497,300 522,200 548,300 570,232 593,041 616,763 641,433 667,091 693,774 721,525 750,386 780,402 811,618 9,338,666 Transportation Impact Fees 310,406 - 809,136 - - - - - - - - - - - - 1,119,542 Add: Annual Long-Term CIP Funding from Special
Revenue Funds (A) 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 2,316,000 34,740,000 Increase (Decrease) to Annual Long-Term CIP Funding
from Special Revenue Funds due to Excess / Deficiency
of Reserves (B) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (2,316,000) (34,740,000) Ending Fund Balance 6,257,718 3,122,918 4,041,054 5,084,054 6,256,654 7,535,903 8,925,554 10,429,498 12,051,767 13,796,538 15,668,144 17,671,074 19,809,983 22,089,694 14,477,281 24,515,208 Less Minimum Fund Balance Requirement (3) - - - - - - - - - - - - - - - Excess Fund Balance Over Minimum Requirement 6,257,718 3,122,918 4,041,054 5,084,054 6,256,654 7,535,903 8,925,554 10,429,498 12,051,767 13,796,538 15,668,144 17,671,074 19,809,983 22,089,694 14,477,281 24,515,208 Net Annual Long-Term CIP Funding from City
General Fund - - - - - - - - - - - - - - - This analysis projects fund balance levels over the 15-year period to determine:
(A) - That there are sufficient funds to meet cash flow requirements in future years (B) - The extent to which excess cash is being reserved FOOTNOTES:
(1) - Beginning Fund Balance is comprised of the following based on the Mid-Year Financial Review:

Measure A 2,624,362
Gas Tax 617,910
Measure M 124,100
SB1 1,512,925
Measure W 381,449
Total 5,260,746
(2) - Non-General Fund Revenues are forecasted using prior acutals inflated by the average growth rate, while Impact Fees are estimated using conservatively probable development schedules. (3) - There is no separate minimum fund balance reserve established by City Council policy regarding streets related projects. The City has a $2 million minimum Capital Investment Fund Balance reserve for emergency contingencies.

4.2 Attachment 2 - Streets Related Funding

97 ATTACHMENT 4 - 15-YEAR CIP COMPARISON
15-Year CIP Comparison
Fifteen Year
Period
FY 24/25 - 38/39
Fifteen Year
Period
FY 25/26-39/40
Increase
(Decrease) Notes
Asset Category
Streets/pathways 24,605,000 31,205,000 6,600,000 26.8% 1 Bridges 750,000 - (750,000) -100.0% 2 Traffic System 8,825,000 7,825,000 (1,000,000) -11.3% 3 Lagoon Structures 20,500,000 24,000,000 3,500,000 17.1% 4 Parks (including Park Equipment) 47,779,350 39,236,600 (8,542,750) -17.9% 5 Buildings (GF portion, including
Building Equipment) 4,912,054 6,100,000 1,187,946 24.2% 6 107,371,404 108,366,600 995,196 0.9% Detailed Analysis:

Note 1 (Streets)
Fifteen Year Period
FY 23/24 - 37/38
Fifteen Year
Period
FY 24/25 -
38/39
Increase
(Decrease)
Additional Funding Required/Project Added: 6,600,000
Increased Street Rehabilitation Funding from $1.5 or $1.8 million to $2.0 million (annual) 24,000,000 30,000,000 (CIP 301-724) PARK PATHWAY IMPROVEMENTS - 600,000 Note 2 (Bridges) (750,000)
Funding appropriated in 2024-2025
(CIP 301-715) SUBSTRUCTURE AND SUPERSTRUCTURE BRIDGE IMPROVEMENTS 750,000 - Note 3 (Traffic System) (1,000,000)
Partial funding appropriated in 2024-2025
(CIP 301-698) TRAFFIC SIGNAL SYSTEM UPGRADES 8,825,000 7,825,000 Note 3 (Lagoon Structures) 3,500,000
Additional Funding Required/Project Added:
(CIP 301-717) LAGOON PUM PSTATION REHABILITATION AND CAPACITY ENHANCEMENT 11,720,000 15,250,000 Partial/all funding appropriated in 2024-2025
(CIP 301-722) LAGOON INTAKE STRUCTURE REHABILITATION 780,000 750,000 Note 5 (Parks)
Additional Funding Required/Project Added: (8,542,750)
PASSIVE TURF REMOVAL AND LANDSCAPE ENHANCEMENT - 1,100,000 Partial/all funding appropriated in 2024-2025
(CIP 301-678) RECREATION CENTER REBUILD 9,559,750 467,000 (CIP 301-712) EDGEWATER PARK SOFTBALL AND SOCCER SYNTHETIC RESURFACING 350,000 - (CIP 301-720) CITY HALL EXTERIOR REHABILITATION 200,000 - Note 6 (Buildings)
No Additional Funding Required/Projects Removed: 1,187,946 (CIP 301-700) FUEL SYSTEM IMPROVEMENTS 922,054 - (CIP 301-708) RENOVATE ELEVATORS IN CITY BUILDINGS 200,000 - REPLACE CITY HALL VARIABLE AIR VALVES (HVAC) 200,000 - REPLACE POLICE STATION HVAC 90,000 - Additional Funding Required/Projects Added:

INSTALL ELECTRIC VEHICLE CHARGING STATIONS - 1,600,000 CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (GENERAL FUND PORTION) - 1,000,000 995,196

4.2 Attachment 4 - 15-Year CIP Comparison

98 City of Foster City Attachment 3 - 15 Year CIP Costs Long-Range CIP Planning
15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040
Capital Project Cost Projections - 15-Year Forecast - All Projects Fund Balance Analysis - 15-Year Forecast (FYE 6/30)
Asset Category
Total Cash
Flow
Requirements 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Streets
Street Rehabilitation 30,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 Bicycle and Pedestrian
Improvements 325,000 - 325,000 - - - - - - - - - - - - - Street Lights/Traffic
Signals/Crosswalk Systems 4,420,000 - 3,610,000 810,000 - - - - - - - - - - - - Subtotal - Street Projects and
Eligible for Funding from
Transportation-related Revenue
Sources (2)
34,745,000 2,000,000 5,935,000 2,810,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 Street Lights/Traffic
Signals/Crosswalk Systems (GF) 2,430,000 - 540,000 1,890,000 - - - - - - - - - - - - Fire and Rescue Boat Ramp
Rehabilitation (GF) 280,000 - 80,000 - 200,000 - - - - - - - - - - - Traffic Signals (Equipment
Replacement ISF) 480,000 - 480,000 - - - - - - - - - - - - - Traffic Signals (Transportation Impact
Fees) 495,000 - 195,000 300,000 - - - - - - - - - - - - Park Facilities Impact Fees 467,000 467,000 - - - - - - - - - - - - - - Lagoons and Stormwater (GF) 24,000,000 7,000,000 4,700,000 4,300,000 - - 8,000,000 - - - - - - - - - Parks (GF) 35,114,600 - 5,340,000 9,475,000 2,865,000 7,606,000 894,600 - 5,819,800 947,000 319,200 600,000 1,248,000 - - - Parks (Park In Lieu) 2,050,000 - - - 2,050,000 - - - - - - - - - - - Parks - Equipment (Equipment
Replacement ISF) 2,205,000 - - 385,000 110,000 435,000 - 290,000 425,000 200,000 360,000 - - - - - Buildings - City CIP Fund 2,800,000 1,000,000 300,000 1,500,000 - - - - - - - - - - - - Buildings (Building Maintenance ISF) 3,300,000 - - 500,000 500,000 - - - 50,000 - 250,000 - 820,000 200,000 - 980,000 Subtotal - Projects Funded from
City Capital Improvement
Projects and other Funds (2)
73,621,600 8,467,000 11,635,000 18,350,000 5,725,000 8,041,000 8,894,600 290,000 6,294,800 1,147,000 929,200 600,000 2,068,000 200,000 - 980,000 Totals 108,366,600 10,467,000 17,570,000 21,160,000 7,725,000 10,041,000 10,894,600 2,290,000 8,294,800 3,147,000 2,929,200 2,600,000 4,068,000 2,200,000 2,000,000 2,980,000 Rounded
Average 15 Year Funding 7,224,440 7,224,000
- Streets Funded Portion 2,316,333 2,316,000 (To Attachment B) - City Capital Investment and non-
Streets Funded Portion 4,908,107 4,908,000 (To Attachment A) FOOTNOTES:
(1) - This analysis identifies the total annual estimated project costs for funding asset construction and/or replacement over a 15-year forecast. (2) - The cash flow requirements for each year are carried forward to the Fund Balance Analysis in Attachments 2 and 1, respectively.

4.2 Attachment 3 - 15-Year CIP Costs

99 Attachment 5 - Suumary of Funding Sources and City CIP Fund Balance Summary of Funding Sources and City CIP Fund Balance
Total 15-year CIP Projects, FY 2025-26 to FY 2039-40 108,366,600 Funding Sources:

Streets related funding sources 34,745,000
Park In-Lieu Fund 2,050,000
Transportation Impact Fees 495,000
Park Facilities Impact Fees 467,000
Equipment Replacement Fund 2,685,000
Building Replacement Fund 3,300,000 43,742,000
Balance to be funded by the General Fund 64,624,600
Projected Beginning City CIP Fund Balance, 7/1/2025 25,445,751 Transfers In from General Fund 86,250,000
Park Facilities Impact Fees for Future Use 5,188,797
Reimbursements from Sports Groups 105,000
Projects to be funded by the General Fund (64,624,600)
52,364,948
Projected Ending City CIP Fund Balance (inclusive of a $2M reserves), 6/30/2040

4.2 Attachment 5 - Summary of Funding Sources and City CIP Fund Balance

100

ATTACHMENT 6 - BUILDINGS AND LAGOONS
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 A B C D E F G H I J K L M N O P Q R S T
Category NO. Project Name Funding
Source
TOTAL - Not
Including Prior
Years
2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-2038 2038-2039 2039-2040

BUILDING PROJECTS
C BD-01 (CIP 301-677) LIBRARY EXTERIOR IMPROVEMENTS AND RE-LANDSCAPING (2017-2018) CC 200,000 200,000 B BD-02 (NEW CIP) INSTALL ELECTRIC VEHICLE CHARGING STATIONS - CY (2025-2026) CC 1,600,000 1,000,000 100,000 500,000 B BD-03 (NEW CIP) CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (FY 2027-2028) PT 1,000,000 1,000,000 BD-03 Funding Souce #1 - General Fund CC 1,000,000 1,000,000 BD-03 Funding Souce #1 - Water Enterprise *CW - - BD-03 Funding Souce #1 - Wastewater Enterprise *CWW - - B BD-04 (NEW CIP) REPLACE CITY HALL AND FIRE STATION ROOF (2027-2028) BMF 500,000 500,000 B BD-05 (NEW CIP) REPLACE COUNCIL CHAMBERS HVAC (2028-2029) BMF 500,000 500,000 (NEW CIP) REPLACE COUNCIL CHAMBERS TOP ROOF BMF 50,000 50,000 (NEW CIP) REPLACE TEEN CENTER HVAC BMF 250,000 250,000 (NEW CIP) REPLACE LIBRARY/COMMUNITY CENTER ROOF BMF 350,000 350,000 (NEW CIP) REPLACE COMMUNITY CENTER/LIBRARY HVAC BMF 350,000 350,000 (NEW CIP) REPLACE CORPORATION YARD ADMINISTRATION ROOF BMF 120,000 120,000 (NEW CIP) REPLACE COUNCIL CHAMBERS ZINC ROOF BMF 200,000 200,000 (NEW CIP) REPLACE CORPORATION YARD HVAC BMF 380,000 380,000 (NEW CIP) REPLACE TEEN CENTER ROOF BMF 300,000 300,000 (NEW CIP) REPLACE POLICE STATION ROOF BMF 300,000 300,000 6,100,000 1,000,000 300,000 2,000,000 500,000 - - - 50,000 - 250,000 - 820,000 200,000 - 980,000 *The $1.00 million funding from the Water Enterprise Fund and Wastewater Collection Sytem Enterprise Fund for the Corporation Yard Fence Replacement Project is not shown here and is included in the 15-Year Enterprise CIP report.

Category NO. Project Name Funding
Source TOTAL 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-2038 2038-2039 2039-2040

STORMWATER / LAGOON PROJECTS
A SW-01 (CIP 301-717) LAGOON PUMP STATION REHABILITATION AND CAPACITY ENHANCEMENT (NEW NAME) (2023-2024) CC 15,250,000 6,950,000 4,000,000 4,300,000 (PREVIOUS CIP 301-717) ADD THIRD AND FOURTH LAGOON PUMP AND RELATED INFRASTRUCTURE (2023-2024) CC
(PREVIOUS CIP 301-718) LAGOON PUMP STATION BUILDING REHABILITATION (2023-2024) CC A SW-02 (CIP 301-722) LAGOON INTAKE STRUCTURE REHABILITATION (2024-2025) CC 750,000 50,000 700,000 (NEW CIP) LAGOON DREDGING CC 8,000,000 8,000,000 24,000,000 7,000,000 4,700,000 4,300,000 - - 8,000,000 - - - - - - - - - Q:\PubWorks\BUDGET\Budget 2025-2026\CIP\2025-03-24 Long Term CIP\CITY Long-Term CIP\CIP 15yr forecast CITY Attachments 2025.03.06 - al_md 1

4.2 Attachment 6 - Capital Improvement Project Fiscal Year 2025-26 through Fiscal Year 2039-40 (Buildings, Storm Water and Lagoon Projects)

101

ATTACHMENT 7 - PARKS
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 43
44 45
46 47
48 A B C D E F G H I J K L M N O P Q R S T
Category NO. Project Name Funding
Source
TOTAL - Not
Including Prior
Years
2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-2038 2038-2039 2039-2040

PARKS PROJECTS
A PK-01 (CIP 301-678) RECREATION CENTER REBUILD (2017-2018) PIF 467,000 467,000 B PK-02 (CIP 301-714) SEA CLOUD MAINTENANCE SHED (2023-2024) CC 2,000,000 2,000,000 C PK-03 (NEW CIP) TENNIS AND BASKETBALL COURTS RESURFACING (2026-2027) CC 320,000 320,000 B PK-04 (NEW CIP) PASSIVE TURF REMOVAL AND LANDSCAPE ENHANCEMENT (FY 2026-2027) CC 1,100,000 1,100,000 B PK-05 (NEW CIP) CATAMARAN AND SEA CLOUD S3 SYTHETIC RESURFACING (2026-2027) CC 1,800,000 1,800,000 C PK-06 (NEW CIP) AMPHITHEATER SYNTHETIC TURF RESURFACING (2026-2027) CC 120,000 120,000 B PK-07 (NEW CIP) PARK PATHWAY REHABILITATION (2027-2028) CC 600,000 600,000 B PK-08 (NEW CIP) DOG PARK INFRASTRUCTURE UPGRADE AND SYNTHETIC TURF REPLACEMENT (2027- 2028) CC 500,000 500,000
C PK-09 (NEW CIP) PARKING LOT RESURFACING (2028-2029) CC 600,000 600,000 B PK-10 (NEW CIP) PORT ROYAL SYNTHETIC TURF RESURFACING (2028-2029) CC 925,000 925,000 B PK-11 (NEW CIP) SEA CLOUD S1, S2, B1 SYNTHETIC RESURFACING (2029-2030) CC 1,300,000 1,300,000 C PK-12 PLACEHOLDER PENDING PARK SYSTEM MASTER PLAN PT 19,895,600 - - 8,760,000 3,500,000 6,741,000 894,600 - - - - - - - - - (NEW CIP) CATAMARAN PARK IMPROVEMENTS (2026-2027) CC 550,000 550,000 GULL PARK RENOVATION - City CIP Fund CC 3,550,000 3,550,000 GULL PARK RENOVATION - Equipment Replacement Fund ERF 260,000 260,000 MARLIN PARK RENOVATION - City CIP Fund CC 3,775,000 3,775,000 MARLIN PARK RENOVATION - Equipment Replacement Fund ERF 125,000 125,000 BOOTHBAY PARK SITE IMPROVEMENTS - City CIP Fund CC 1,840,000 500,000 1,340,000 BOOTHBAY PARK SITE IMPROVEMENTS - Equipment Replacement Fund ERF 110,000 110,000 BOOTHBAY PARK SITE IMPROVEMENTS - Parks-in-Lieu Fund PIL 2,050,000 2,050,000 TURNSTONE PARK RENOVATION - City CIP Fund CC 1,622,000 1,622,000 TURNSTONE PARK RENOVATION - Equipment Replacement Fund ERF 100,000 100,000 SUNFISH PARK RENOVATION - City CIP Fund CC 2,508,000 2,508,000 SUNFISH PARK RENOVATION - Equipment Replacement Fund ERF 200,000 200,000 SHAD PARK RENOVATION - City CIP Fund CC 2,176,000 2,176,000 SHAD PARK RENOVATION - Equipment Replacement Fund ERF 135,000 135,000 GATESHEAD PARK RENOVATION - City CIP Fund CC 894,600 894,600 (NEW CIP) REPLACE CATAMARAN PLAYGROUND ERF 150,000 150,000 (NEW CIP) REPLACE KETCH PLAYGROUND ERF 140,000 140,000 (NEW CIP) SEA CLOUD PARK S4 SYNTHETIC RESURFACING CC 1,294,000 1,294,000 (NEW CIP) RESURFACING: TENNIS (EDGEWATER, CATAMARAN); BASKETBALL (CATAMARAN, VIBE, EDGEWATER) CC 304,800 304,800
(NEW CIP) REPLACE PORT ROYAL PLAYGROUND ERF 125,000 125,000 (NEW CIP) REPLACE SEA CLOUD PLAYGROUND ERF 200,000 200,000 (NEW CIP) ERCKENBRACK PARK RENOVATION PT 4,321,000 4,321,000 PK-XX Funding Source #1 - City CIP Fund CC 4,221,000 4,221,000 PK-XX Funding Source #2 - Equipment Replacement Fund ERF 100,000 100,000 (NEW CIP) EDGEWATER PARK SOFTBALL AND SOCCER SYNTHETIC RESURFACING CC 647,000 647,000 (NEW CIP) REPLACE SHOREBIRD PARK FITNESS COURT ERF 200,000 200,000 (NEW CIP) DOG PARK SYNTHETIC RESURFACING CC 300,000 300,000 (NEW CIP) RESURFACING: TENNIS (EDGEWATER, CATAMARAN); BASKETBALL (CATAMARAN, VIBE, EDGEWATER) CC 319,200 319,200
(NEW CIP) REPLACE KILLDEER PARK PLAYGROUND ERF 180,000 180,000 (NEW CIP) REPLACE FARRAGUT PLAYGROUND ERF 180,000 180,000 (NEW CIP) PARKING LOT RESURFACING (Civic Center, South Drive; Police Station; Port Royal; Boat Park; Library/Community Center; Rec. Ctr. & South Parkinglot; Senior Center; Boothbay; Sea Cloud) CC 600,000 600,000 (NEW CIP) CATAMARAN AND SEA CLOUD S3 SYTHETIC RESURFACING CC 1,248,000 1,248,000 39,836,600 467,000 5,340,000 9,860,000 5,025,000 8,041,000 894,600 290,000 6,244,800 1,147,000 679,200 600,000 1,248,000 - - - Q:\PubWorks\BUDGET\Budget 2025-2026\CIP\2025-03-24 Long Term CIP\CITY Long-Term CIP\CIP 15yr forecast CITY Attachments 2025.03.06 - al_md 1

4.2 Attachment 7 - Capital Improvement Program Fiscal Year 2025-26 through Fiscal Year 2039-40 (Parks Projects)

102

ATTACHMENT 8 - STREETS
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46

A B C D E F G H I J K L M N O P Q R S TI
Category NO. Project Name Funding Source
TOTAL - Not
Including Prior
Years
2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-2038 2038-2039 2039-2040

STREET / TRAFFIC SIGNAL PROJECTS
A ST-01 (CIP 301-698) TRAFFIC SIGNAL SYSTEM UPGRADES (2020-2021) PT 7,825,000 4,825,000 3,000,000 ST-01 Funding Souce #1 - SB1 SB1 -
ST-01 Funding Souce #2 - Measure A MA 2,740,000 2,530,000 210,000 ST-01 Funding Souce #3 - Measure M MM 380,000 250,000 130,000 ST-01 Funding Souce #4 - Measure W MW 1,300,000 830,000 470,000 ST-01 Funding Source #5 - Equipment Replacement Fund ERF 480,000 480,000 - ST-01 Funding Souce #6 - Transportation Impact Fees TIF 495,000 195,000 300,000 ST-01 Funding Souce #7 - City CIP CC 2,430,000 540,000 1,890,000 A ST-02 (NEW CIP) STREET REHABILITATION (2025-2026) PT 2,000,000 2,000,000 - - ST-03 Funding Souce #1 - Measure A MA - - ST-03 Funding Souce #2 - Gas Tax GT 500,000 500,000 ST-03 Funding Souce #3 - Meassure M MM - - ST-03 Funding Souce #4 - SB1 SB1 1,500,000 1,500,000 B ST-03 (NEW CIP) FIRE AND RESCUE BOAT RAMP REHABILITATION (2026-2027) CC 280,000 80,000 200,000 C ST-04 (NEW CIP) BICYCLE AND PEDESTRIAN IMPROVEMENTS (2026-2027) SB1 325,000 325,000 A ST-05 (NEW CIP) STREET REHABILITATION (2026-2027) PT 2,000,000 - 2,000,000 ST-05 Funding Souce #1 - Measure A MA 1,010,000 1,010,000 ST-05 Funding Souce #2 - Gas Tax GT 425,000 425,000 ST-05 Funding Souce #3 - Meassure M MM -
ST-05 Funding Souce #4 - SB1 SB1 565,000 565,000 A ST-06 (NEW CIP) STREET REHABILITATION (2027-2028) PT 2,000,000 2,000,000 ST-06 Funding Souce #1 - Measure A MA 740,000 740,000 ST-06 Funding Souce #2 - Gas Tax GT 310,000 310,000 ST-06 Funding Souce #3 - Meassure M MM -
ST-06 Funding Souce #4 - SB1 SB1 950,000 950,000 A ST-07 (NEW CIP) STREET REHABILITATION (2028-2029) PT 2,000,000 2,000,000 ST-07 Funding Souce #1 - Measure A MA 725,000 725,000 ST-07 Funding Souce #2 - Gas Tax GT 325,000 325,000 ST-07 Funding Souce #3 - Meassure M MM -
ST-07 Funding Souce #4 - SB1 SB1 950,000 950,000 A ST-08 (NEW CIP) STREET REHABILITATION (2029-2030) PT 2,000,000 2,000,000 ST-08 Funding Souce #1 - Measure A MA 700,000 700,000 ST-08 Funding Souce #2 - Gas Tax GT 300,000 300,000 ST-08 Funding Souce #3 - Meassure M MM -
ST-08 Funding Souce #4 - SB1 SB1 1,000,000 1,000,000 (NEW CIP) STREET REHABILITATION (long term) PT 20,000,000 - 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 ST-XXX Funding Souce #1 - Measure A MA 5,000,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 ST-XXX Funding Souce #2 - Gas Tax GT 5,000,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 ST-XXX Funding Souce #3 - Meassure M MM 5,000,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 ST-XXX Funding Souce #4 - SB1 SB1 5,000,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 38,430,000 2,000,000 7,230,000 5,000,000 2,200,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 Q:\PubWorks\BUDGET\Budget 2025-2026\CIP\2025-03-24 Long Term CIP\CITY Long-Term CIP\CIP 15yr forecast CITY Attachments 2025.03.06 - al_md 1

4.2 Attachment 8 - Capital Improvement Program Fiscal Year 2025-26 through Fiscal Year 2039-40 (Street Projects)

103

DATE: March 24, 2025

TO: President and Members of the Estero Municipal Improvement District (EMID) Board of Directors
VIA: Stefan Chatwin, District Manager
Marene Subhashini, Assistant District Manager

FROM: Andrew Brozyna, Public Works Director/City Engineer Nate Cruz, Finance Director
DEPARTMENT: Public Works
Finance
SUBJECT: FIFTEEN YEAR WATER AND WASTEWATER FUNDS CAPITAL

IMPROVEMENT PROJECTS PROGRAM AND FUNDING PLAN
FOR THE PREPARATION OF THE DISTRICT’S FISCAL YEAR
2025-2026 BUDGET AND FIVE-YEAR FINANCIAL PLAN

RECOMMENDATION
It is recommended that the EMID Board of Directors receive and accept the District’s 15-year Water and Wastewater Funds Capital Improvement Projects Program and its funding plan for the preparation of the District’s Fiscal Year 2025-2026 budget and five- year financial plan.

EXECUTIVE SUMMARY
In 2010, the EMID Board approved a funding strategy for its Water and Wastewater Capital Improvement Projects (CIP) in the form of a Long-Term CIP Funding program.

The current model uses a 15-year capital expenditure forecast and funds those forecasted needs on an annual basis. The District also generally refrains from using debt to finance its capital projects unless it is necessary because of the magnitude of the project (e.g., the Wastewater Treatment Plant project (WWTP).

4.3 4.3 Staff Report

104

The CIP Reserve balances, inclusive of the minimum $2.0 million emergency reserves in both the Water and Wastewater Funds, are projected to be $5.44 million and $6.58 million respectively on June 30, 2025.

Based on the 15-year Water CIP assessment, City staff identified an annual cash funding need from Water operating funds of $2.6 million in years 1 and 2, followed by $2.5 million in years 3 and 4, $1.75 million in year 5, then leveling off at $1.5 million for the remaining 10 years of the 15-year plan. In addition, a loan of $4.0 million may be needed in year 3 to fund the new Water Tank Lining and Structural Retrofit CIP, which is shown in the Water Rate Model attached to the Water Rate Staff Report on the March 24, 2025 Budget Study Session agenda.

In the Wastewater Enterprise, staff has identified $23.2 million of CIP projects over the next two years (of which $11.3 million are for the WWTP project that is cash funded). As a result, annual funding of $16.0 million is needed for the first year before declining to $3.5 million annually for six years and leveling off at $2.5 million for the remaining 8 years of the 15-year CIP Plan. These funding levels have been incorporated into the rate recommendations which are detailed in separate reports on the March 24, 2025 Budget Study Session agenda.

BACKGROUND
The EMID Board of Directors has made it a priority to ensure that the District’s infrastructure is well maintained on an ongoing basis. Such proactive maintenance, repair, and replacement of infrastructure ensures that key systems are operating at peak levels, promotes safety, provides for a continuity of services to the community, maintains property values, and maintains the quality of life that the community has come to expect.

In the District’s early years, capital improvement efforts were primarily focused on the construction of new infrastructure. Now that the District is at build-out, there has been a transition from new construction to infrastructure maintenance and replacement (e.g. the WWTP project). This affects how the District characterizes and funds future CIP programs.

Maintenance vs. CIP
Managing the District’s infrastructure manifests itself in the following ways:
•Proactive Maintenance Activities – The preventative maintenance efforts of the District’s Maintenance crews on an ongoing basis reduce the overall future costs of District infrastructure. These ongoing operating costs offset the magnitude and expense of future infrastructure replacement projects.
•Recurring CIPs – Some CIPs are considered “recurring” and amount to significant repair work, such as pipe repairs, water valve replacements, and water tank lining and coating projects. The underlying infrastructure is still usable, but these larger maintenance efforts help to extend the useful lives of the underlying infrastructure.

4.3 4.3 Staff Report

105

•Infrastructure Replacement/Construction Projects – Other CIPs are considered so significant in nature that the entire infrastructure is replaced or built anew. An example of this are the Lift Station rehabilitation projects and the WWTP project.

The District has historically considered the latter two categories (Recurring CIPs and Infrastructure Replacement/Construction) as CIPs, and has funded these projects out of specifically designated CIP funds within each respective Enterprise fund. The District has also incorporated long-term CIP projects in its rate models so that the burden of such projects can be planned for and incorporated into the rate structure to mitigate the impact on customers over a longer period.

ANALYSIS
Approach
The District hired Bartle Wells Associates (BWA) to update the water and wastewater rate model to include the fiscal impacts of the WWTP project on the Long-Term CIP funding analysis and in light of current maintenance efforts, assessment of replacement requirements, and replacement costs in the following categories:

Water System
•Fire Hydrants – these important safety amenities are included in the water operations
•Water Infrastructure – this includes pipes, valves, seismic retrofits, water tank improvements (not replacement), and other elements of the delivery of water from the point of the District’s water structures to delivery at customers’ properties •Water Structures – this includes the four (4) water tanks and the booster pump station located at the Corporation Yard
Wastewater System
•Pipelines – the primary means of collecting wastewater from customers and transporting it to the WWTP in San Mateo
•Valves – which serve as critical junction and shutoff points within the system •Lift Stations – since Foster City is relatively flat, Lift Stations and their accompanying generators assist wastewater to flow through the system to the wastewater treatment plant where gravity would otherwise serve this purpose •Parallel Force Mains – critical elements at key points that connect the wastewater system
Next, District staff considered the level of maintenance and serviceability of capital assets in order to determine the appropriate estimated useful lives of each asset. District staff also considered the relative costs associated with such maintenance to evaluate the cost- effectiveness of such maintenance efforts.
15-Year CIP Capital Improvement Projects Program and Key Changes from the Prior Year (Attachment 5)

4.3 4.3 Staff Report

106

The Capital Improvement Plan has been updated to best reflect the recommended projects needed in the 15-year term. Some key changes include the addition of one (1) new water project and two (2) new wastewater projects not previously included in the plan, as well as the removal of projects that are currently funded and not anticipated to require additional funding in future years. Some projects reflect an expanded scope of work and some were updated based on the significant inflationary increases in the construction market. Specific and detailed information about the calculations performed and the 15-year projects are found in Attachments 1 to 6 to this report.

Assumptions
Funding Sources
Initial assumptions were made about the funding sources of the various assets (typically enterprise operating fund transfers to the enterprise CIP Fund, equipment replacement fund, and/or development capacity fees). If an asset’s replacement value would be considered so significant that the only effective funding option is to use debt financing (in the form of bonds, federal and state programs, bank loans, etc.) those assets would be excluded. The asset categories and their typical funding sources for the Water and Wastewater enterprise are as follows:

Water System
•Fire Hydrants – hydrants do not typically call for replacement; operating funds are used to replace hydrants which are damaged or require repair. •Valves – CIP funding is needed to replace, rehabilitate or repair various infrastructure elements such as pipes, valves, and other elements mentioned above when necessary; system wide replacement of each element type is not anticipated short of a catastrophic event.
•Water Structures – water tanks have very long lives; lining in the three steel tanks requires CIP funding approximately every 15 years.
•Water Meters – funding for meters that are replaced as part of CIPs is included in the analysis. Some water meter replacements that are in the Equipment Replacement Fund or replaced during maintenance operations are not considered as part of this analysis.

Wastewater System
•Pipes – CIP funding for pipes requiring rehabilitation or repair; system-wide replacement of pipes is not anticipated short of a catastrophic event •Valves – valve replacement costs are included in CIP plans. •Lift Stations – lift station rehabilitation projects require CIP funding; generators, their transfer switches, and portable generators that are funded through Equipment Replacement funds and are not considered as part of this analysis. •Parallel Force Mains – force main replacement requires CIP funding. •Wastewater Treatment System (WWTP) – rehabilitation that San Mateo is undertaking under its 10-year integrated Wastewater Master Plan (Clean Water Program) for which the District will be responsible for its proportionate share of

4.3 4.3 Staff Report

107

costs. Much of its costs are funded through debt financing with surplus working capital providing the balance of funding.

Expenditure Assumptions
Replacement values were reviewed and updated from the prior year’s analysis as necessary. All values were expressed in terms of future replacement, taking into consideration factors such as inflation, project size, timing and construction contingency funding.

Revenue Assumptions
In both the cases of Water and Wastewater rates, CIP funding is considered as part of the “fixed costs” of each system and is included in the 10-year rate model which projects costs using a “pay-as-you-go” philosophy. The rate model does not reflect the actual expenditures on CIPs; rather it reflects annual planned funding. 15-Year Funding Methodology
The District generally uses a funding methodology that looks at the total replacement value of assets that are scheduled to be replaced in the next 15-year window, and then averages the replacement amount over the 15-years. The Public Works Department prepared the 15-year project list considering replacement value, timing, and necessity.

Based upon staff’s review of the components of the 15-Year CIP funding needs, the average annual funding need is $1.833 million for Water CIP projects, and $3.774 million for Wastewater CIP projects.

This funding amount is then compared to the available fund balance reserves, and those reserves are compared to the cash flow requirements to fund projects in the 15-year forecast. The EMID Board of Directors' minimum emergency reserve requirement for capital improvement projects is $2.0 million each for the Water Capital Improvement Projects Fund and the Wastewater Capital Improvements Project Fund. The 15-Year Fund Balance analysis then reduces the 15-Year Average CIP funding to maintain the Capital Projects Fund Reserves in each fund above the $2 million minimum reserve threshold over the 15-year forecast.

CEQA
Not Applicable

FISCAL IMPACT
Staff seeks EMID Board comments on District’s 15-year capital improvement projects as well as direction to implement the following funding plan as shown in the analysis in the attachments to this report. If approved, the FY 2025-2026 Preliminary Enterprise Budget

4.3 4.3 Staff Report

108

and Five-Year Financial Plan will be prepared, and water and wastewater rates for FY 2025-2026 will be calculated to include the following:
•Water Capital Improvement Plan: $2.6 million in years 1 and 2, $2.5 million in years 3 and 4, $1.75 million in year 5, $1.5 million annually for the remaining 10 years of the 15-year plan.
•Wastewater Capital Improvement Plan: $16.0 million in year 1, $3.5 million for the next six years; $2.5 million for the remaining 8 years of the 15-year CIP Plan.

CITY COUNCIL VISION, MISSION, AND VALUE/PRIORITY AREA
Fiscal Sustainability
ATTACHMENTS:

Attachment 1 – Water Enterprise CIP Funding Strategy
Attachment 2 – Water Enterprise 15-Year CIP Costs
Attachment 3 – Wastewater Enterprise CIP Funding Strategy Attachment 4 – Wastewater Enterprise 15-Year CIP Costs
Attachment 5 – Water and Wastewater 15-Year CIP Comparison Attachment 6 – Capital Improvement Program Fiscal Year 2025-2026 through Fiscal Year 2039-2040

4.3 4.3 Staff Report

109

Estero Municipal Improvement District
Long-Range CIP Planning
Attachment 1 - Water Enterprise CIP Funding Strategy
15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040 Water Enterprise Fund Funding Strategy
15-Year Fund Balance Analysis
Fund Balance Analysis - 15-Year Forecast (FYE 6/30) 15 year 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Total Beginning Fund Balance
Less: Capital Improvement Expenditures
Add: Other Funding Sources
5,438,483 7,804,953 6,954,953 2,460,912 3,522,912 4,272,912 (50,000) (2,500,000) (2,000,000)
5,722,912 4,722,912 4,222,912
-
5,722,912
(750,000)
6,472,912
(750,000) (1,750,000) (4,250,000)
7,222,912 6,972,912 4,222,912
(750,000)
4,972,912
(750,000) (27,488,000)
5,438,483
(800,000) (3,450,000) (7,250,000) (1,438,000) (1,000,000) Water Connection Fees 566,470 - 255,959 - - - - - - - - - - - - 822,429 Add: Annual Long-Term CIP Funding from Operations (1)
Increase (Decrease) to Annual Long-Term CIP Funding due to Excess / Deficiency of Reserves (2)
4,433,000 4,433,000 4,333,000 4,333,000 3,583,000 3,333,000 3,333,000 3,333,000 3,333,000 3,333,000 3,333,000 3,333,000 3,333,000 3,333,000 3,333,000 54,445,000 (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (1,833,000) (27,495,000) Ending Fund Balance
Less Minimum Fund Balance Requirement
Excess Fund Balance Over Minimum Requirement
7,804,953
2,000,000
5,804,953
6,954,953
2,000,000
4,954,953
2,460,912
2,000,000
460,912
3,522,912
2,000,000
1,522,912
4,272,912
2,000,000
2,272,912
5,722,912
2,000,000
3,722,912
4,722,912
2,000,000
2,722,912
4,222,912
2,000,000
2,222,912
5,722,912
2,000,000
3,722,912
6,472,912
2,000,000
4,472,912
7,222,912
2,000,000
5,222,912
6,972,912
2,000,000
4,972,912
4,222,912
2,000,000
2,222,912
4,972,912
2,000,000
2,972,912
5,722,912
2,000,000
3,722,912
5,722,912
2,000,000
3,722,912
Net Annual Long-Term CIP Funding from Operations (1) - (2) 2,600,000 2,600,000 2,500,000 2,500,000 1,750,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 26,950,000 NOTE:

This analysis projects fund balance levels over the 15-year period to determine:
(A) - That there are sufficient funds to meet cash flow requirements in future years (B) - The extent to which excess cash is being reserved

4.3 Attachment 1 - Water Enterprise CIP Funding Strategy

110

Estero Municipal Improvement District
Long-Range CIP Planning
Attachment 2 - Water Enterprise 15-Year CIP Costs
15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040 Water Enterprise Fund Funding Strategy
15-Year Capital Expenditure Requirements
Capital Expenditure Requirements - 15-Year Forecast (FYE 6/30) Total Cash
Flow
Asset Category Requirements 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Fire Hydrants (1)
Water Main Condition Assessment
Permanent Emergency Bypass
Transmission Main on E. Third Ave.

Water Tank Lining and Structural
Retrofit
Large Water Valve Replacement
Coating on Transmisison Main at Seal
Slough Bridge
Assessment of Cathodic Protection
Anode Beds
Water Facilities Seismic Vulnerabilty
Assessment
500,000 500,000
300,000
- -
-
-
-
- - -
-
-
-
-
-
- - - - - -
1,000,000 700,000 - - - - - - - -
8,550,000
1,500,000
-
-
750,000 5,250,000
1,000,000
-
-
-
-
50,000 2,500,000 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-500,000 -
-
-
-
-
-
-
-
1,000,000 -
-
-
1,000,000 - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
500,000
125,000
-
-
500,000
125,000
Two Engins and Pump Replacement at
Water Booster Pump Station
Chlorine Analyzers and Auto Flushers
East Hillsdale Blvd Loop
Large Water Valve Replacement
Recycled Water Connection
Large Water Valve Replacement
Water System Improvement Project
Water Tank Inspection and Recoating
Corp Yard Fencing
975,000 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
375,000 600,000
700,000
138,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
700,000
138,000
-
-
-
-
-
-
-
1,000,000
1,000,000
2,000,000
4,500,000
3,500,000
500,000
-
-
-
-
-
-
1,000,000
-
-
-
-
-
1,000,000
1,000,000
- -
1,000,000
750,000
-
750,000
3,500,000
-
-
-
-
750,000 750,000 750,000 750,000
-
-
-
-
-
-
-
-
-
-500,000
Totals 27,488,000 800,000 3,450,000 7,250,000 1,438,000 1,000,000 50,000 2,500,000 2,000,000 750,000 750,000 1,750,000 4,250,000 750,000 750,000 Average 15 Year Funding 1,832,533
1,833,000say
NOTE:

This strategy identifies the average annual cash flow requirements for funding asset replacement over a 15-year forecast. (1) - Fire hydrants are replaced as needed through the annual operating budgets. Short of a major catastrophe, it is assumed operating budgets will handle replacements
(2) - Projects identified by Water Master Plan (approved in February 2020), are based on approximate budgeting numbers and are subject to change based on Staff's analysis in the current year

4.3 Attachment 2 - Water Enterprise 15-Year CIP Costs

111

Estero Municipal Improvement District
Long-Range CIP Planning
Attachment 3 - Wastewater Enterprise CIP Funding Strategy 15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040 Wastewater Enterprise Fund Funding Strategy
15-Year Fund Balance Analysis
Fund Balance Analysis - 15-Year Forecast (FYE 6/30) 15 year 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Total Beginning Fund Balance
Less: Capital Improvement Expenditures
Add: Other Funding Sources
6,578,500
(20,359,516)
3,343,063
(2,857,803)
3,985,260
(2,600,000)
6,826,080
(4,800,000)
5,526,080
(3,000,000)
6,026,080
(2,690,000)
6,836,080
(5,700,000)
4,636,080
-
7,136,080
(2,200,000)
7,436,080
-
9,936,080
(6,200,000)
6,236,080
-
8,736,080
(6,200,000)
5,036,080
-
7,536,080
-
6,578,500
(56,607,319)
Wastewater Connection Fees
Add: Annual Long-Term CIP Funding from Operations (1)
1,124,079
19,774,000
- 1,940,820
7,274,000
- - - - - - - - - - - - 1,124,079
7,274,000 7,274,000 7,274,000 7,274,000 7,274,000 6,274,000 6,274,000 6,274,000 6,274,000 6,274,000 6,274,000 6,274,000 6,274,000 113,610,000 Increase (Decrease) to Annual Long-Term CIP Funding due to Excess / Deficiency of Reserves (2)
Ending Fund Balance
Less Minimum Fund Balance Requirement
Excess Fund Balance Over Minimum Requirement
(3,774,000)
3,343,063
2,000,000
1,343,063
(3,774,000)
3,985,260
2,000,000
1,985,260
(3,774,000)
6,826,080
2,000,000
4,826,080
(3,774,000)
5,526,080
2,000,000
3,526,080
(3,774,000)
6,026,080
2,000,000
4,026,080
(3,774,000)
6,836,080
2,000,000
4,836,080
(3,774,000)
4,636,080
2,000,000
2,636,080
(3,774,000)
7,136,080
2,000,000
5,136,080
(3,774,000)
7,436,080
2,000,000
5,436,080
(3,774,000)
9,936,080
2,000,000
7,936,080
(3,774,000)
6,236,080
2,000,000
4,236,080
(3,774,000)
8,736,080
2,000,000
6,736,080
(3,774,000)
5,036,080
2,000,000
3,036,080
(3,774,000)
7,536,080
2,000,000
5,536,080
(3,774,000) (56,610,000)
10,036,080
2,000,000
8,036,080
8,095,260
2,000,000
6,095,260
Net Annual Long-Term CIP Funding from Operations (1) - 16,000,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 57,000,000 NOTE:

This analysis projects fund balance levels over the 15-year period to determine:
(A) - That there are sufficient funds to meet cash flow requirements in future years (B) - The extent to which excess cash is being reserved

4.3 Attachment 3 - Wastewater Enterprise CIP Funding Strategy

112

Estero Municipal Improvement District
Long-Range CIP Planning
Attachment 4 - Wastewater Enterprise 15-Year CIP Costs
15-Year Forecasts and Funding Options
FY 2025-2026 through FY 2039-2040 Wastewater Enterprise Fund Funding Strategy
15-Year Cash Flow Model
Cash Flow Requirements - 15-Year Forecast (FYE 6/30)
Total Cash
Flow
Asset Category
WWTP Master Plan Improvements
Requirements
11,317,319
2026
9,959,516
2027
1,357,803
2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Emergency Generator Replacements
Shell Bridge Sanitary Sewer Force
Main Rehabilitation
Sanitary Sewer Life Station
Improvements Phase 6
2,000,000
500,000
2,000,000
500,000
-
-
8,900,000
2,500,000
7,900,000
-
1,000,000
500,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-Replacements 2,000,000
Overflow, Redundancy, Bypassing
and Backup Power Study
Wasterwater Master Plan
Sanitary Sewer Life Station
Improvements Phase 7
1,100,000
600,000
-
-
-
-
100,000
-
1,000,000
600,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6,200,000
1,000,000
-
-
-
-
-
-
3,200,000
-
3,000,000
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-Sanitary Sewer System Improvements
Wastewater Collection Systems
Iimprovements
1,000,000
6,090,000
5,700,000
-
-
-
-
-
-
-
-
-
-
1,690,000
-
- -
-
2,200,000
-
-
-
-
-
-
-
2,200,000
-
-
-
-
-Improvements Phase 8
Sanitary Sewer Lift Station
Improvements Phase 9
5,700,000
6,200,000
4,000,000
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
6,200,000
-
-
-
- -
-
-
-Lift Station Electrical Control Upgrade - 4,000,000
Corp Yard Fencing
Totals
500,000
56,607,319
- - 500,000
2,600,000
- - - - -
-
- -
-
- -
-
- -
-
-
-20,359,516 2,857,803 4,800,000 3,000,000 2,690,000 5,700,000 2,200,000 6,200,000 6,200,000 Average 15 Year Funding 3,773,821
3,774,000say
Waste Water Treatment Plant
project encumbrances 1
- - - -
NOTE:

This strategy identifies the average annual cash flow requirements for funding asset replacement over a 15-year forecast. (1) The District and the City of San Mateo are undertaking the rehabilitation of its jointly owned wastewater treatment plant (WWTP) located in San Mateo. Under the terms of the Joint Powers Agreement, EMID is responsible for 24.12% and the City of San Mateo is responsible for 75.88% of the WWTP costs. The estimated District apportionment of total project cost is $163.3 million through FY 2025-26. The project's debt financings have included Revenue Bonds, Revenue Notes/WIFIA loan, and a State Resolving Loan. (2) The District has capacity in its Operating Fund's working capital to pay a portion of the joint WWTP costs. (3) The District also has capacity in its Operating Fund's working capital to pay for it's sole costs consisting of consultants (EKI, Hydroscience, etc.) and legal counsel.

4.3 Attachment 4 - Wastewater Enterprise 15-Year CIP Costs

113

ATTACHMENT 5 - WATER AND WASTEWATER 15-YEAR CIP COMPARISON 15-Year CIP Comparison
Fifteen Year Period
FY 24/25 - 38/39
Fifteen Year Period
FY 25/26 - 39/40
Increase
(Decrease) Notes
Water Enterprise:

Water Main Condition Assessment 250,000 500,000 250,000 1 Permanent Emergency Bypass Transmission Main on E. Third Ave 1,000,000 1,000,000 - 2 Large Water Valve Replacment (24-25) 1,500,000 1,500,000 - 2 Coating on 24-inch Transmission Main at Seal Slough Bridge 1,000,000 1,000,000 - 3 Assessment of Cathodic Protection Anode Beds 500,000 500,000 - 2 Water Facilities Seismic Vulnerability Assessment 125,000 125,000 - 2 Two Engines and Pump Replacement at Water Booster Pump Station 975,000 975,000 - 2 Chlorine Analyzers and Auto Flushers 700,000 700,000 - 2 East Hillsdale Boulevard Loop 138,000 138,000 - 2 Large Water Valve Replacment (Long-Term) 3,000,000 3,000,000 - 2 Recycled Water Connection 1,000,000 1,000,000 - 2 Water System Improvements Project 4,500,000 4,500,000 - 2 Water Tank Inspection and Recoating 3,500,000 3,500,000 - 2 Corporation Yard Fence Replacement/Rehabilitation - 500,000 500,000 4 Water Tank Lining and Structural Retrofit - 8,550,000 8,550,000 5 Total 18,188,000 27,488,000 9,300,000 Wastewater Enterprise:

Emergency Generator Replacements 3,900,000 2,000,000 (1,900,000) 6 Shell Bridge Sanitary Sewer Force Main Rehabilitation 500,000 500,000 - 2 Sanitary Sewer Lift Stations (Phase 6 and 7) 15,100,000 15,100,000 - 2 Sanitary Sewer Manhole Replacements 2,500,000 2,500,000 - 2 Overflow, Redundancy, Bypass, and Backup Power Study 1,100,000 1,100,000 - 2 Sanitary Sewer System Improvements 1,000,000 1,000,000 - 2 Wastewater Collection System Improvements 6,090,000 6,090,000 - 2 Sanitary Sewer Lift Stations (Phase 8 and 9) 11,900,000 11,900,000 - 2 Lift Station Electrical Control Upgrade 4,000,000 4,000,000 - 2 WWTP Joint Costs to be funded by surplus Operating Fund Working Capital 10,102,575 11,317,319 1,214,744 7 Wastewater Master Plan - 600,000 600,000 8 Corporation Yard Fence Replacement/Rehabilitation - 500,000 500,000 4 56,192,575 56,607,319 414,744
Detailed Analysis:

Note 1
Costs realigned to encompass specialty training. Project details in the Five-Year CIP.

Note 2
No funding changes recommended form FY 2024-2025 plan.

Note 3
No funding changes recommended from FY 2024-2025 plan; $500,000 from Water Capacity Fees Note 4
Project allocated to CIP City 50%, Water Capital 25% and Wastewater Capital 25%. Project details in the Five-Year CIP.

Note 5
Project details in the Five-Year CIP.

Note 6
Phase 1 (generator purchase) underway. Remaining funding for subsequent phases. Project details in the Five-Year CIP Note 7
EMID specific costs to be paid with enterprise revenues; Joint costs to be funded by surplus Operating Fund working capital.

Note 8
Wastewater Master Plan recommended to be updated every 20 years.

4.3 Attachment 5 - Water and Wastewater 15-Year CIP Comparison

114

ATTACHMENT 6 - WATER AND WASTEWATER CIP PROJECTS

A B C D E F G H I J K L M N O P Q R S
1 2
3 4
Category NO. Project Name Funding Source TOTAL - Not Incl 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-2038 2038-2039

WATER PROJECTS
A WA-01 (CIP 405-723) WATER MAIN CONDITION ASSESSMENT (2024-2025) CW CW
500,000 500,000
300,000
5 6
(NEW CIP) PERMANENT EMERGENCY BYPASS TRANSMISSION MAIN ON E. THIRD AVE. (2025- 2026)A WA-02 1,000,000 700,000
A
B
WA-03
WA-04
(NEW CIP) WATER TANK LINING AND STRUCTURAL RETROFIT (2026-2027) (NEW CIP) LARGE WATER VALVE REPLACEMENT (2026-2027)
CW
CW
8,550,000
1,500,000
1,000,000
750,000 5,250,000 50,000 2,500,000
7 8 1,000,000 500,000
B WA-05 (NEW CIP) COATING ON 24-INCH TRANSMISSION MAIN AT SEAL SLOUGH BRIDGE (2026-2027) PT 1,000,000 9 WA-05 Funding Source #1 - Water Fund
WA-05 Funding Source #2 - Water Development Impact Fees CW
WCF
CW
500,000
500,000
500,000
125,000
500,000
500,000
10 11
12 13
A
A
WA-06
WA-07
(NEW CIP) ASSESSMENT OF CATHODIC PROTECTION ANODE BEDS (2027-2028 (NEW CIP) WATER FACILITIES SEISMIC VULNERABILITY ASSESSMENT (2027-2028) 500,000
125,000CW
(NEW CIP) TWO ENGINES AND PUMP REPLACEMENT AT WATER BOOSTER PUMP STATION (2027-2028)A
A
WA-08 CW
CW
975,000
700,000
375,000 600,000
14 WA-09 (NEW CIP) CHLORINE ANALYZERS AND AUTOFLUSHERS AT VARIOUS LOCATIONS (2028-2029) 700,000 138,000
15 16
17 18
19 20
B
B
WA-10
WA-11
(NEW CIP) EAST HILLSDALE BOULEVARD LOOP (2028-2029)
(NEW CIP) LARGE WATER VALVE REPLACEMENT (2029-2030)
(NEW CIP) RECYCLED WATER CONNECTION
CW
CW
CW
CW
CW
138,000
1,000,000
1,000,000
2,000,000
4,500,000
1,000,000
1,000,000
1,000,000(NEW CIP) LARGE WATER VALVE REPLACEMENT PROJECT (NEW CIP) WATER SYSTEM IMPROVEMENTS PROJECT
1,000,000
750,000750,000
750,000
750,000 750,000 750,000
(NEW CIP) WATER TANK INSPECTION AND RECOATING CW
CW
3,500,000
500,000
3,500,00021
22 B BD-03 (NEW CIP) CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (FY 2027-2028) 500,000 27,488,000 800,000 3,450,000 7,250,000 1,438,000 1,000,000 50,000 2,500,000 2,000,000 - 750,000 1,750,000 4,250,000 750,00023 24 25
26 Category NO. Project Name Funding Source TOTAL 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-2038 2038-2039

WASTEWATER PROJECTS
27 28
29 30
31 A
A
A
A
WW-01 (CIP 455-652) WASTEWATER TREATMENT PLANT MASTER PLAN IMPROVEMENTS (2015-2016) CWW CWW
CWW
CWW
11,317,319
2,000,000
500,000
9,959,516
2,000,000
500,000
1,357,803
WW-02
WW-03
WW-04
(CIP 455-705) EMERGENCY GENERATOR REPLACEMENTS (2021-2022) (CIP 455-710) SHELL BRIDGE SANITARY SEWER FORCE MAIN REHABILITATION (2022-2023) (CIP 455-719) SANITARY SEWER LIFT STATION IMPROVEMENTS - PHASE 6 (2023-2024) 8,900,000 7,900,000 1,000,000 500,000A
B
WW-05 (NEW CIP) SANITARY SEWER MANHOLE REPLACEMENTS (2026-2027) CWW CWW
2,500,000
1,100,000
2,000,000
100,000
32 WW-06 (NEW CIP) OVERFLOW, REDUNDANCY, BYPASSING AND BACKUP POWER STUDY (2027-2028) 1,000,000 33 34
35 36
37 38
39 40
B
A
WW-07
WW-08
(NEW CIP) WASTEWATER MASTER PLAN (2028-2029)
(NEW CIP) SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE 7 (2028-2029) (NEW CIP) SANITARY SEWER SYSTEM IMPROVEMENTS (formerly CIP 455-696) (NEW CIP) WASTEWATER COLLECTION SYSTEMS IMPROVEMENTS
CWW
CWW
CWW
CWW
CWW
CWW
CWW
CWW
600,000
6,200,000
1,000,000
6,090,000
5,700,000
6,200,000
4,000,000
600,000
3,200,000 3,000,000
1,000,000
1,690,000 2,200,000 2,200,000
(NEW CIP) SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE 8 (NEW CIP) SANITARY SEWER LIFT STATIONS IMPROVEMENTS - PHASE 9 (NEW CIP) LIFT STATION ELECTRICAL CONTROL UPGRADE
5,700,000
5,700,000
6,200,000
6,200,000
4,000,000
6,200,000
B BD-03 (NEW CIP) CORPORATION YARD FENCE REPLACEMENT/REHABILITATION (FY 2027-2028) 500,000 500,00041 42 43
56,607,319 20,359,516 2,857,803 2,600,000 4,800,000 3,000,000 2,690,000 - 2,200,000 - - - C:\Users\alorenz\Desktop\CIP\2025-03-24 Long Term CIP\Enterprise Long-Term CIP\CIP 15yr forecast WATER and WASTEWATER BUDGET 3.5.25-al 6

4.3 Attachment 6 - Capital Improvement Program Fiscal Year 2025-2026 through Fiscal Year 2039-2040

115

DATE: March 24, 2025

TO: President and Members of the Estero Municipal Improvement District (EMID) Board of Directors
VIA: Stefan Chatwin, District Manager
Marlene Subhashini, Assistance District Manager

FROM: Nate Cruz, Finance Director
Andrew Brozyna, Public Works Director
Zaheed Danish, Public Works Maintenance Manager
DEPARTMENT: Finance, Public Works
SUBJECT: REVIEW OF PROJECTED WATER RATES FOR FY 2025-2026 TO FY 2029-2030 AND POLICY DIRECTION FOR RATE
NOTIFICATION UNDER PROPOSITION 218 AND AB 2257

RECOMMENDATION
It is recommended that the Estero Municipal Improvement District (EMID) Board of Directors take the following actions by Minute Order:

1. Accept this report regarding Water Rates based upon the attached Draft Water Rate Study Update Results Memo dated March 19, 2025, prepared by Bartle Wells Associates (BWA); and

2. Approve the water rate setting procedures included in this staff report as Attachment 2 – Rate Setting Procedures which incorporate and implement the requirements contained in Proposition 218 and the procedures by which property owners are required to exhaust administrative remedies and record principles as set forth in Government Code section 53759.1 and 53759.2 (AB 2257); and

3. Provide direction on the issuance of a notice to all rate payers under the requirements of Proposition 218 for a public hearing to be held on June 2, 2025, regarding Water Rates for a 5-year period of FY 2025-2026 to FY 2029-2030.

EXECUTIVE SUMMARY

4.4 4.4 Staff Report

116

The EMID water enterprise service rates remain below average compared to other agencies on the Bay Area Peninsula. As of July 1, 2024, the Operating Reserve balance was $11,194,614 to be used in case of an operational emergency or to smooth any “rate shocks” to water customers. However, as much of EMID’s infrastructure is in its fifth decade in service, components are nearing the end of their expected service life and the need for additional funding for infrastructure improvements has been identified.

In Fiscal Year 2019- 2020, the District completed a 20-year master plan study which identified and prioritized projects for a 20-year time horizon. The costs for recommended projects have been incorporated into the 10-year Water Enterprise projections and the rate model developed by consultant BWA. The recommended water rates will provide sufficient revenue for necessary maintenance, operations, and capital improvements for the five-year period of FY 2025-2026 to 2029-2030.

Adopting a multi-year rate plan offers several advantages. These include predictability in rate adjustments, ensuring revenue stability through a long-term structure, improving operational efficiency, and certainty for ratepayers that minimizes protest . Although adoption of 5–year rates is recommended, it is further recommended that rates be reviewed annually to ensure they remain aligned with the cost of service.

Included below is a snapshot of Table 7 from Appendix C of the BWA Water Rate Study Update Results Memo (Attachment 1) This table shows the proposed water rates for FY 2025-2026 to FY 2029-2030 and a projection of future water rates necessary to support the operation. Water bills are composed of two components: a fixed monthly charge based on meter size, plus a water consumption charge based on each customer’s metered water use. The fixed monthly charge corresponds to the District’s fixed costs to provide water delivery to customers, based upon the size of the meter.

4.4 4.4 Staff Report

117

Included below is Table 9 from Attachment 1, which provides more information about how the proposed new rates impact ratepayers and projects the impact into the future.

The proposed water rates are designed to cover District operating and capital costs and maintain the operating fund above the 25% target reserve level. The recommended rates reflect the following:
•FY 2025-2026 – 3% volumetric rate increase and a 8.5% meter charge increase.

The average bill for a single-family home would increase by 5% which is equal to $4.05 per month.
•FY 2026-2027- 3.2% volumetric rate increase and a 8% meter charge increase The average bill for a single-family home would increase by 5% which is equal to $4.26 a month per month.
•FY 2027-2028 – 3.8% volumetric rate increase and a 7% meter charge increase The average bill for a single-family home would increase by 5% which is equal to $4.51 per month.
•FY 2028-2029 – 3.6% volumetric rate increase and a 7.1% meter charge increase. The average bill for a single-family home would increase by 5% which is equal to $4.71 per month.
•FY 2029-2030 – 3.6% volumetric rate increase and a 7% meter charge increase.

The average bill for a single-family home would increase by 5% which is equal to $4.94 per month.

Table 7City of Foster City / Estero Municipal Improvement DistrictProposed Water Rates - Two Tier Hybrid Model Current Rates FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 FY2035 Monthly Meter Charge3/4" $28.85 $31.30 $33.80 $36.15 $38.70 $41.40 $43.05 $44.75 $46.55 $48.40 $50.351" 48.08 52.17 56.33 60.25 64.50 69.00 71.75 74.58 77.58 80.67 83.921-1/2" 115.40 125.20 135.20 144.60 154.80 165.60 172.20 179.00 186.20 193.60 201.402" 153.87 166.93 180.27 192.80 206.40 220.80 229.60 238.67 248.27 258.13 268.533" 336.58 365.17 394.33 421.75 451.50 483.00 502.25 522.08 543.08 564.67 587.424" 605.85 657.30 709.80 759.15 812.70 869.40 904.05 939.75 977.55 1,016.40 1,057.356" 1,346.33 1,460.67 1,577.33 1,687.00 1,806.00 1,932.00 2,009.00 2,088.33 2,172.33 2,258.67 2,349.678" or greater 2,308.00 2,504.00 2,704.00 2,892.00 3,096.00 3,312.00 3,444.00 3,580.00 3,724.00 3,872.00 4,028.00 Conservation-Based Water Rate Model (based on bi-monthly allotments)*Single Family ResidentialTier 1 0-20 per ccf 6.60 6.80 7.02 7.29 7.56 7.84 8.17 8.44 8.72 9.01 9.31Tier 2 Over 20 ccf 7.33 7.56 7.79 8.08 8.34 8.59 8.92 9.19 9.46 9.75 10.05Multi-Family Residential (per living unit)Tier 1 0-10 ccf per living unit 6.60 6.80 7.02 7.29 7.56 7.84 8.17 8.44 8.72 9.01 9.31Tier 2 Over 10 ccf per living unit 7.36 7.54 7.77 8.06 8.32 8.57 8.90 9.17 9.44 9.73 10.03Irrigation CustomersTier 1 <=100% of annual budget 6.60 6.80 7.02 7.29 7.56 7.84 8.17 8.44 8.72 9.01 9.31Tier 2 >100% of annual budget 7.80 7.76 8.00 8.29 8.55 8.79 9.12 9.39 9.66 9.95 10.24Commercial and Fire Line CustomersBase Consumption Rate 6.72 6.92 7.14 7.41 7.68 7.96 8.29 8.56 8.83 9.12 9.42 Monthly Fire Meter Charge1-1/2" & below 40.39 43.82 47.32 50.61 54.18 57.96 60.27 62.65 65.17 67.76 70.492" 53.95 58.53 63.21 67.60 72.37 77.42 80.50 83.68 87.05 90.51 94.153" 117.71 127.70 137.90 147.49 157.90 168.91 175.64 182.58 189.92 197.47 205.434" 212.05 230.06 248.43 265.70 284.45 304.29 316.42 328.91 342.14 355.74 370.076" 471.12 511.13 551.95 590.33 631.97 676.06 703.01 730.77 760.16 790.37 822.228" or greater 807.80 876.40 946.40 1,012.20 1,083.60 1,159.20 1,205.40 1,253.00 1,303.40 1,355.20 1,409.80(Minimum charge is equivalent to 1-1/2" meter charge)

TWO TIER HYBRID MODEL
Recommended Rates
*Recommended SFPUC wholesale rate pass through formula: (Additional SFPUC $ Amount Per HCF Above Study) / (0.9) added to each volumetric rate. 0.9 Accounts for 10% Water loss

4.4 4.4 Staff Report

118

Based upon the EMID Board of Directors' policy direction, the District will mail a notice to all ratepayers by March 31, 2025, in order to comply with the required procedures under Proposition 218 and AB 2257, as summarized below.

The hearing will be held on June 2, 2025, and, if adopted, the new rates will go into effect on July 1, 2025.

BACKGROUND/ANALYSIS
The District provides water service to approximately 8,295 water service and fire protection service accounts/meters. Most of the District’s customers are residential.

The primary drivers for the proposed rates include the following:
•Cost of Wholesale Water from the San Francisco Public Utilities Commission (SFPUC)
The primary driver for the proposed rate increases is projected increases in the SFPUC wholesale water rate. The SFPUC, the sole source of water supply for the District, is projecting the current rate of $5.67 per hundred cubic feet (hcf, also abbreviated as ccf) in FY 2025 will increase 2.1% to $5.79 in FY 2026, 1% to $5.85 in FY 2027, 1% to $5.91 in FY 2028, 5.2% to $6.22 in FY 2029, and 8% to $6.72 in FY 2030.The proposed water rates are designed to phase in District rate increases over time to avoid sharp increases. Any increases implemented by SFPUC above these values are recommended to be passed through to District customers via Government Code section 53756, as discussed later in this report.
•Bay Area Water Supply and Conservation Agency (BAWSCA) Surcharge.

The District will continue to make annual payments to BAWSCA for capital improvement costs associated with the $4.8 billion Water System Improvement Project (WSIP) to upgrade the Hetch Hetchy Water System. The bond surcharge for each BAWSCA agency is typically a fixed annual amount that is adopted each fiscal year by the BAWSCA Board to ensure collection of necessary revenue to pay that year’s obligated debt service. The payment is estimated at $675,000 annually.

Table 9Foster City / Estero Municipal Improvement DistrictProjected Water Rate Impacts Current
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Two Tier Hybrid ModelSingle Family Residential Monthly Rate $81.65 $85.70 $89.96 $94.47 $99.18 $104.12 $108.41 $112.27 $116.31 $120.48 $124.83$ Increase 4.05 4.26 4.51 4.71 4.94 4.29 3.86 4.04 4.17 4.35% Increase 5.0% 5.0% 5.0% 5.0% 5.0% 4.1% 3.6% 3.6% 3.6% 3.6% Based on Single Family Residential Use of 8 ccf
Fiscal Year Ending June 30 Extended Year ProjectionProjected Water Bills

4.4 4.4 Staff Report

119

•System Water Losses. Water utilities incur real losses from pipeline leakage and apparent losses when customer water consumption is not properly measured or billed. The current water rates are calculated with an assumption of

10.0% water loss based on the Water Division’s records. The proposed water rates are designed to cover the water loss and fund projects, such as water meter replacements, that reduce water loss.
•Capital Funding. EMID's strategy for funding long-term capital water improvements calls for an annual transfer from water operating revenues to the City's Capital Improvement Fund to fund projects over the next 15 years. The proposed rate projections allocate approximately $12 million to the Capital Improvement Account over the next five years to support critical infrastructure projects, including water tank lining, structural retrofitting, and an emergency bypass transmission main. In addition to annual transfers, BWA anticipates the need to secure $4 million in short term debt financing in Fiscal Year 2027- 2028 to provide the necessary cash to fund these improvements. While the specific funding source has not yet been identified, current planning assumptions estimate a 30-year loan at a 6% interest rate with 1.5% transaction costs.

By securing financing instead of immediately raising rates, the EMID can ensure that cash flow needs are met while allowing funds to be replenished over time.

Should staff determine that debt financing is recommended in FY 2027-2028, the recommendation will be presented to the EMID Board for approval. •Conservation Costs. District staff is recommending that the EMID Board of Directors continue to allocate $200,000 annually to the Water Sustainability Rebate Program to encourage voluntary water conservation efforts and provide funding for the District water leakage detection and repair program. •Operational Costs. BWA projections for operations and maintenance costs assume 4.0% annual increases in personnel costs, and an allowance for additional staff positions that may be needed over the 5-year term to support water enterprise projects subject to Council approval. Annual increases of 2.5% in all other costs (excluding wholesale water purchases) have been assumed to keep revenues in line with operating expenses.

Table 3 below summarizes the District’s projected costs which are anticipated to increase over the next five years between 2.1% and 6.6% annually.

4.4 4.4 Staff Report

120

Water/Wastewater Rate Assistance Program
In Rate Year 2020-2021, the District Board approved an assistance program for customers whose income also qualified them for Pacific Gas and Electric Company's California Alternate Rates for Energy (CARE) discount program. The cost to EMID of providing the Water/Wastewater Rate Assistance Program (W/WRAP) discount is paid by non-rate sources of revenue such as fines and penalties, to maintain compliance with California Proposition 218. Therefore, water rates are unaffected by the costs of the program.

The cost of the W/WRAP, based on current enrollment of 34 customers, is $6,120 per year for the Water Enterprise. Through the first eight months of FY 2024, revenue from delinquent payments totaled $27,000, which is sufficient to fund the program. Staff will continue to monitor the funding sources available for the program.

The W/WRAP is authorized by the EMID Board on an annual basis, and authorization to continue the program will be an action item on the agenda with the consideration of rates in June.

Rate Smoothing
The EMID Board of Directors has implemented a long-term rate smoothing model that takes into consideration the long-range wholesale water rate projections by the SFPUC

4.4 4.4 Staff Report

121

and significant capital improvements that have a profound impact on rates, such as the WSIP program. The policy goal of the rate smoothing model is to maintain revenue increases at no greater than 10% per year. The proposed FY 2025-2026 rates use a 10-year model, which has proven to be successful in dampening the impacts of significant rate increases imposed by the SFPUC on the ratepayers. “Pass Through” for Water Use Rates
A significant driver for the proposed water use rate increases is projected increases in the SFPUC wholesale water rate. Government Code section 53756 allows EMID to “pass through” changes to the wholesale cost to its customers. It is proposed that EMID implement a “pass-through” adjustment whereby changes by SFPUC to its rates in excess of the estimated increases will be reflected in EMID’s retail water rates for water during the rate period. EMID customers will be notified of any such pass-through adjustments at least 30 days prior to the change in rates (on or after each July 1 of the 5-year period). The rate model includes an escalator estimating SFPUC water use charges, and the pass through provision would only be implemented if the wholesale rate increase was in excess of the estimate. If the rate comes in lower than anticipated, the additional proceeds would be transferred to reserves to help smooth rates in the future.

Rate Survey
A survey of communities along the San Francisco Peninsula was conducted to compare the District’s typical residential monthly water bill with neighboring communities. The results of the survey are summarized on the Typical Single Family Residential Monthly Water Charges chart in Appendix B of Attachment 1. Since it is unknown what the comparator agencies will be proposing for FY 2025-2026, the District compares its current monthly residential water bills to the current rates of the neighboring agencies. The survey indicates the District's water rates remain among the lowest on the Peninsula. For FY 2024-2025, the average monthly water bill for the region (based on 8 hcf of water for monthly usage) is $116.09 per month and the District’s average monthly residential water bill is $81.65 per month, or about 30% less than the current average of neighboring communities. Since the proposed increase is also less than the FY 2025 average, it is likely that EMID customers will continue to pay lower than average water bills.

Public Hearing Notification
As identified in the second Recommended Action, staff has prepared the Rate Setting Procedures (Attachment 2) to document the process that EMID will follow leading up to and during the public hearing to consider approval of the updated water rates. Those Rate Setting Procedures are summarized below.

In past rate setting years, EMID has followed the provisions of Proposition 218 to provide rate payers with information regarding the public hearing to set rates.

4.4 4.4 Staff Report

122

Proposition 218, approved in 1996, established a process for public notification when increasing property related fees or charges, including water and wastewater rates. The notification requires a minimum 45-day period for review and opportunity to protest in writing prior to the close of the public hearing. If written protests are received by a majority of affected parcels prior to the close of the public hearing, then the rate change may not be implemented.

In addition to ongoing compliance with the requirements of Proposition 218, the Rate Setting Procedures also incorporate the optional requirements under AB 2257(Government Code sections 53759.1 and 53759.2, effective January 1, 2025, AB 2257). Under AB 2257, EMID is authorized to establish a supplemental process intended to provide an opportunity for property owners to submit a written objection regarding a new or increased water rate to EMID's attention early in the rate consideration process. Accordingly, this provides an opportunity for EMID to address or resolve any objections before the EMID Board makes a final decision on whether to adopt a proposed rate pursuant to Proposition 218. Unlike written protests under Proposition 218, written objections under AB 2257 must specify the grounds for alleging the proposed rates do not comply with Proposition 218, among other requirements.

Since written objections are required to provide more detail and be submitted earlier than written protests, written objections will also serve as written protests; however, written protests will not serve as written objections.

Instituting AB 2257 prohibits a person or entity from bringing a judicial action or proceeding alleging noncompliance with Proposition 218 (Article XIII D of the California Constitution) for those water rates, unless that person or entity has timely submitted to EMID a written objection to that rate that specifies the grounds for alleging noncompliance with Proposition 218.

Based on the Boards’ direction, staff will prepare a notice that will be mailed to all ratepayers on or before March 31, 2025, in compliance with the provisions of Proposition 218 and AB 2257. Written objections must be received by EMID by May 15, 2025. EMID staff will consider each timely written objection and provide a written response that will be published with the agenda for the public hearing of June 2, 2025.

Written protests must be received by the close of the public hearing.

A public hearing on and adoption of the proposed rates will be agendized for the June 2, 2025 EMID Board of Directors regular meeting in conjunction with the FY 2025-2026 Annual Budget Public Hearing. If adopted, the new rates will become effective July 1, 2025. It the opinion of District staff that conservative assumptions have been employed in the creation of the attached rate models and that the rates proposed herein are the maximum rates that would be recommended. At the public hearing, the EMID Board would have the option to adopt rates equal to or lower than what is noticed to rate payers under Proposition 218, but it may not increase the rates above what is noticed.

4.4 4.4 Staff Report

123

CEQA
Not Applicable

FISCAL IMPACT
There is no impact to receiving this report and authorizing the preparation of the Proposition 218 Notice, including information about AB 2257. Rate revenue provides all funding for the water distribution service costs in the EMID service area. The costs of these services do not impact the City budget or the General Fund.

CITY COUNCIL VISION, MISSION, AND VALUE/PRIORITY AREA
Facilities and Infrastructure
Innovation and Sustainability
Smart Planning, Development, and the Local Economy
ATTACHMENTS:

Attachment 1 – Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025
Attachment 2 – Rate Setting Procedures

4.4 4.4 Staff Report

124

1 | Page

2625 Alcatraz Ave, #602
Berkeley, CA 94705
Tel 510 653 3399
www.bartlewells.com

DATE: March 19th, 2025

TO: City of Foster City/Estero Municipal Improvement District

FROM: Bartle Wells Associates

SUBJECT: Water Rate Study Update Results DRAFT

SUMMARY OF FINDINGS AND RECOMMENDATIONS

Introduction and Background
The Estero Municipal Improvement District (District ) engaged Bartle Wells Associates (BWA) to develop 10-year financial projections for the District’s Water Enterprise and to project water rate adjustments for the next five-year period. BWA last conducted formal rate studies in 20 24, which resulted in a one -year rate approval for water rates for FY 2025.

Current and projected water service rates are in the low range compared to other agencies on the Peninsula, however, the District water enterprise s face unique infrastructure funding challenges.

Water Enterprise Summary
The primary driver for the proposed rate increases is to smooth District rate increases due to projected increases in the San Francisco Public Utilities Commission (SFPUC) wholesale water rate. The rate increase is due to a variety of factors including debt service on existing and newly issued bonds, continued low water usage, and repayment of the balancing account. Additionally, the District has increased the annual amount of projected capital expenditure transfers from the operating reserve fund to the capital reserve fund from $1 million to $2.4 million on average.

SFPUC, the sole source of water supply for the District, released updated projections for their wholesale rate for the next 5 years (FY 2026 to FY 2030) . SFPUC is projecting the current rate of $5.67 in FY 2025 per hundred cubic feet (ccf) will increase 2.1% to $5.79 in FY 2026, 1% to $5.85 in FY 2027, 1% to $5.91 in FY 2028, 5.2% to $6.22 in FY 2029, and 8% to $6.72 in FY 2030. Any increases implemented by SFPUC above these values are

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

125

2 | Page

recommended to be passed through to District customers via Government Code section 53756, as explained on page 11.

BWA projects the SFPUC rate will increase 3.5% annually beyond FY 2030 based on the average increase projected by SFPUC. 3.5% also corresponds well to BWA’s estimate of future cost inflation in the economy.

SFPUC rates were historically held level at $4.10/ccf for six years (FY 2017 to FY 2022) despite escalating SFPUC debt service and operating costs through use of a balancing account. The balancing account was built up from SFPUC wholesale water sales exceeding projections used in rate setting . In FY 2023, the wholesale rate increased 15.9% to $4.75/ccf, 9.7% to $5.21 in FY 2024, and 8.8% to $5.67 in FY 2025.

During the time that SFPUC wholesale rates were held flat by the balancing account, the District has been gradually increasing its volumetric rates in anticipation of projected wholesale rate increases by SFPUC. While the wholesale rate increases have come to fruition, the District’s rates have been phased to ensure sufficient revenues and avoid sharp increases based on a rate smoothing model.

The District will also continue to make annual payments, projected to be $ 675,000 annually, to the Bay Area Water Supply and Conservation Agency (BAWSCA) for the Water System Improvement Project (WSIP) that was funded through the issuance of bonds. The water enterprise’s single largest cost is water purchases from SFPUC.

WSIP is a multi- year capital initiative with a budget of $4.8 billion. Its goal is to enhance both the regional and local water systems managed by the SFPUC. The program focuses on repairing, replacing, and seismically upgrading critical parts of the Hetch Hetchy Regional Water System. WSIP encompasses 87 projects, including 35 local projects within San Francisco and 52 regional projects across seven counties, extending from the Sierra foothills to San Francisco. By October 2020, the San Francisco portion of the program had been fully completed. In March 2022, the SFPUC Commission approved updates to the program, including a schedule extension to February 2027.

BWA proposed water rates are designed to maintain the operating fund above target levels (90 days operating expenses in reserves) and cover District operating and capital costs. The District is projected to set aside approximately $12 million for capital improvements over the next 5 years. The capital improvement set aside amount is based on funding the District’s water master plan. Major projects include valve replacements,

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

126

3 | Page

water tank lining and structural retrofitting, and an emergency bypass transmission main, among others. BWA projects the District will need to obtain $ 4 million of debt financing to fund the capital improvements in FY 2028. The source of the funds is unknown currently and is estimated to be a 30-year loan at 6% interest with 1.5% transaction costs for planning purposes.

Proposed water rates are based on 1 0% water loss. That is, 90 % of the water EMID purchases are sold to retail customers. The losses have decreased over time due to the District’s efforts to replace aging meters. Water loss refers to the difference between the amount of water put into the distribution system and the amount of water billed to customers. This loss can be categorized into two main types:

• Real Losses: These are physical losses of water from the system due to leaks, overflows, or breaks in the water mains, service lines, and other infrastructure.

Real losses can be caused by aging infrastructure, corrosion, damage, or faulty installation.

• Apparent Losses: These are losses caused by non-infrastructure related incidents such as inaccuracies in metering, data handling errors, or unauthorized consumption (water theft).

The District separates its costs into variable costs (captured by a volumetric rate) and fixed costs (captured by a meter charge rate). (see page 1 8 and Table 6.) To maintain the operating reserve s, fund the capital set aside, and phase in volumetric rates , BWA recommends the District implement a 3% volumetric rate increase and a 8.5% meter charge increase in FY 2026 . The average bill for a single family home would increase by 5% or $4.05 per month.

Detailed water rate calculations are shown in APPENDIX C.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

127

4 | Page

Rate Survey
A survey of communities along the San Francisco Peninsula was conducted to compare the District’s typical residential monthly water bills with neighboring communities. The results of the water survey are summarized in APPENDIX B.

The water survey compares a monthly water bill for 8 units (1 unit = 1 ccf) of water which would be a common residential consumption. Including the recommended increase, the District’s average monthly water bill proposed for FY 2026 is $85.70. Since it is unknown what the comparator agencies are proposing for FY 2026, the District compares its FY 2025 monthly residential water bills to the FY 2025 monthly residential water bills for the neighboring agencies. The survey indicates that the District’s water rates are among the lowest on the Peninsula. The average monthly water bill for the region based on 8 ccf is $116.09 per month and the District’s average monthly residential water bill is $81.65 per month, or about 30% less. Since the proposed increase is also less than the FY 2025 average, it is likely that EMID customers will continue to pay lower than average water bills.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

128

5 | Page

Water Enterprise Fund
The District currently provides water service to a population of approximately 3 6,500.

Most of the District’s customers are residential. Table 1 shows approximately 8,295 accounts/meters that allow for water service and fire protection service.

Meter ratios reflect the proportionate volume of water that may flow through the various meter sizes. The total 3/4” meter equivalents in the District amounts to 20,229 based on industry standard meter ratios established by the American Water Works Association (AWWA).

Private fire meter ratios are set at 35% of regular meter ratios due to lower usage frequency, as they are primarily for emergency use. Fire meters are often on standby and only used during fire emergencies, resulting in less operational time and reduced maintenance and inspection requirements compared to regular water meters. Fire service lines of 1-1/2" and smaller diameters often have similar flow rates and pressure requirements, making it practical to treat them as a single category for cost and rate purposes.

The water enterprise service area includes Foster City and the Mariner’s Island area shown in APPENDIX D.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

129

6 | Page

Table 2 illustrates the current reserves that the District can draw down in case of emergency or to smooth any “rate shocks” to its customers.

The District is meeting its 90-day operating fund reserv e target (estimated to be $ 4.4 million.) The target is based on the District’s long standing reserve policy and is an industry Table 1
City of Foster City / Estero Municipal Improvement District Water Meters By Size
Data as of: 01/22/25
Water Service
3/4" 6,832 1.00 6,832
1" 466 1.67 777
1-1/2" 182 4.00 728
2" 379 5.33 2,021
3" 89 11.67 1,038
4" 61 21.00 1,281
6" 39 46.67 1,820
8" or greater 19 80.00 1,520
Subtotal 8,067 16,017
Private Fire Protection Service
1-1/2" & below 11 1.40 15
2" 0 1.87 0
3" 2 4.08 8
4" 35 7.35 257
6" 95 16.33 1,551
8" or greater 85 28.00 2,380 Subtotal 228 4,212
Total 8,295 20,229
Source: Foster City/Estero Municipal Improvement District water use records [2] Private fire protection service ratio based on the fire service line; Resolution No. 2715 [3] Equals the number of accounts multiplied by the meter ratio for each meter size.

Meter Size Accounts Meter Ratio1,2 Est. Meter Equivalents3 [1] The meter ratios shall be based on meter size in compliance with ratios established by the American Water Works Association (AWWA) Sizing Water Service Lines and Meters M22, Second Edition, 2004 (M22 Manual)

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

130

7 | Page

standard minimum target to maintain adequate short term liquidity in case of emergencies.

The wholesale water purchase rates that SFPUC and BWA are projecting through FY 2030 are shown graphically in CHART A. The SFPUC rates are projected to increase from $5.67/ccf in FY 2025 to $6.72/ccf in FY 2030.

Table 2
City of Foster City / Estero Municipal Improvement District W
ater Enterprise Operating Reserves
July 1, 2024
Fund Reserve Component Reserve Balance
Reserved for Maintenance & Operation (401) $11,194,614
Total $11,194,614
operating expenditures.

Note: Rate model only includes fund reserve components available to fund ongoing Source: City of Foster City/Estero Municipal Improvement District Staff

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

131

8 | Page

CHART A

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

132

9 | Page

Table 3 summarizes the District’s projected operating costs which are anticipated to increase over the next five years between 2.1% and 6.6% annually.

Table 3
City of Foster City / Estero Municipal Improvement District Water Enterprise O&M Projection
Revised
Budget
FY2025 FY2026 FY2027 FY2028 FY2029 FY2030
Employee Services 2,956,001 3,387,751 3,523,261 3,664,191 3,810,759 3,963,190 4.0% Additional Cost [2] - 31,339 303,873 313,542 324,103 335,045 varies Internal Services - Others 1,244,701 1,449,956 1,486,205 1,523,360 1,561,444 1,600,480 2.5% Internal Services - Equipment
Replacement Fund 456,767 396,971 406,895 417,068 427,494 438,182 2.5% Services & Supplies 817,062 979,062 1,003,539 1,028,627 1,054,343 1,080,701 2.5% SFPUC Water Purchases 10,467,000 10,814,000 10,966,000 11,119,000 11,742,000 12,727,000 varies BAWSCA Bond Repayment 601,416 670,356 675,000 675,000 675,000 675,000 Reallocation [3] 1,362,521 1,373,045 1,407,371 1,442,555 1,478,619 1,515,585 2.5% Water Sustainability 250,000 250,000 200,000 200,000 200,000 200,000 TOTAL O&M Expenditures 18,155,468 19,352,480 19,972,144 20,383,343 21,273,763 22,535,182

6.6% 3.2% 2.1% 4.4% 5.9%
[1] Based on City/District Staff direction
[2] A placeholder for potential additional positions to support the water enterprise Five Year Projection Annual %
Increase [1]Expenditures
[3] Costs allocated to the water enterprise for the cost of services provided to the enterprise by City departments, as documented in the City’s cost allocation study.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

133

10 | Page

Table 4 summarizes the current water rates. The District has variable expenditures which are expenditures that are impacted by the amount of water its customers consume. These costs must be recouped via its volumetric water charge, $6.60 per ccf in FY 2025. Likewise, the District’s meter charges recover fixed expenditures, expenditures that are fixed regardless of amount of water that is consumed, $28.85 for a ¾” meter in FY 2025.

District Tiered Rates Cost Basis
The District has a two-tiered model for its residential customers where higher levels of water consumption are subject to higher water rates based on a proportionate share of conservation program costs. Commercial customers are charged a uniform rate, which includes commercial customers’ proportionate share of conservation program costs.

Water conservation programs for District customers aim to reduce water use in the District service area and help water users save water and money. Conservation efforts include rebates, such as conversion of living grass lawn to more water-wise options, rain barrels to collect rainwater, smart irrigation controllers to minimize excess water use; education, including free landscaping and gardening classes and educational programs for students in local schools and the Foster City Library; self-audit kits for indoor water use and landscape audits for outdoor water use, and more.

Conservation program costs of $200,000 per year are allocated to each customer class based on the proportionate impact of each customer class on the need for the program and its costs.

Residential and irrigation customers pay conservation costs on Tier 2 usage only, while commercial customers pay their share of conservation costs on each unit of water usage.

For its irrigation customers, the District has worked with John Whitcomb of Waterfluence to assign each irrigation customer a water budget. Any water consumed above the irrigation customers allotted amount is subject to a higher Tier 2 rate based on each customer’s share of conservation program costs.

APPENDIX A shows the District’s historical water use trends from the prior year . BWA’s proposed rates are designed to match volumetric expenses (such as water purchases) with volumetric revenue. The rate structure mitigates over or under collecting revenue due to fluctuations in water use.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

134

11 | Page

District Residential Tier Allotments
The tiered rate allotments are designed to align with the state’s gallon per capita per day (GPCD) mandate. Low-tier users are already consuming water within the prescribed limits, meaning their consumption does not drive the need for the conservation program. The District is required to incur the costs of the conservation program to offset water overuse by those categories of water users (Tier 2 users) that exceed the state’s GPCD threshold. Thus, those Tier 2 users are required to pay their proportionate share of the costs of the conservation program.

While Tier 1 users participate in the program, their conservation efforts are aimed at offsetting the overuse of Tier 2 users. The necessity for Tier 1 conservation arises because of the high consumption in Tier 2.

SFPUC Wholesale Rate Passthrough
SFPUC establishes the wholesale water rate and for each unit of water the District purchases, which accounts for 100% of the District’s water supply. If SFPUC increases the wholesale water rate, the District is authorized to pass through the increase to customers in accordance with Government Code section 53756.

The formula for calculating the pass through amount will be: (Additional SFPUC $ Amount Per CCF Above Study Projections / 0.9) additional charge for each unit of water usage, where 0.9 accounts for 10% water loss. The District will provide 30 days’ notice before passing through an increase in water rates. The District will not convene another public hearing before passing through any increase in the District’s water rates.

For example, if the SFPUC rate in FY 2027 is $5.94, the pass through would be calculated as the following: ($5.94-$5.85)/0.9 = $0.10 per ccf. $0.10 per ccf would be added to all District volumetric rates. The 0.9 factor is designed to adjust for the fact that the District sells 90% of its water purchases.

To elucidate the pass -through calculation with a simple example: Suppose an individual purchases 10 apples for $1 and is only able to sell 5 of them. To fully recover the cost, the selling price per apple would need to be $2. This scenario represents a loss percentage of 50%.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

135

12 | Page

Now, if the purchase price per apple doubles to $2 and the price increase is only raised by the difference (i.e., $1), then the total expenditure would be $20 (10 apples x $2 per apple).

However, only $15 would be generated in revenue (5 apples x $3 per apple). Therefore, the price increase must be passed on by dividing the increase by (1 - loss percentage).

The necessary price increase should be calculated as: ($1/0.5) = $2

With this adjustment, the expenditure remains $20 (10 apples x $2 per apple) and the revenue generated is $20 (5 apples x $4 per apple).

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

136

13 | Page

Table 4
City of Foster City / Estero Municipal Improvement District Current Rates
Current Rates 2025
Fixed Meter Charge
Monthly Meter Charge
Meter Size
3/4" $28.85
1" $48.08
1-1/2" $115.40
2" $153.87
3" $336.58
4" $605.85
6" $1,346.33
8" or greater $2,308.00
Bi-Monthly Water Consumption Tiers and Rates
Single Family Residential
Tier 1 0-20 per ccf $6.60
Tier 2 Over 20 ccf $7.33
Multi-Family Residential
Tier 1 0-10 ccf per living unit $6.60
Tier 2 Over 10 ccf per living unit $7.36
Irrigation Customers
Tier 1 <=100% of annual budget $6.60
Tier 2 >100% of annual budget $7.80
Commercial and Fire Line
All usage $6.72
Monthly Private Fire Protection Charge
Meter Size
1-1/2" & below $40.39
2" $53.95
3" $117.71
4" $212.05
6" $471.12
8" or greater $807.80

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

137

14 | Page

Low Income Discount
Currently the District has approximately 34 customers enrolled in the Water/Wastewater Rate Assistance Program (WWRAP), which was implemented in 2020. Customers meeting the eligibility and qualification requirements below are granted a discount of up to $15 per month each on their qualifying Water accounts, not to exceed a $30 per month discount per customer. To be eligible for the WWRAP, customers must show that they qualify for the PG&E CARE Program or other public assistance program or submit proof of income eligibility.

The estimated maximum potential cost of a $15/month discount for 34 customers amounts to $6,120 per year. Since the low income discount revenue sources cannot be funded with rates, rates are unaffected by the decision on the terms of the program and hence are not required to be included in the Proposition 218 notification.

The District funds the current low income discount through non-rate sources of revenue such as fines and penalties, cell tower lease and general fund revenue to maintain compliance with California Proposition 218. The discount is recommended to be provided as funds are available. Late penalties collected year to date for water in FY 2025 amounted to $27,000, exceeding the cost of the program.

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

138

15 | Page

APPENDIX A

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

139

16 | Page

APPENDIX B

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

140

17 | Page

APPENDIX C

Table 5
City of Foster City / Estero Municipal Improvement District Water Enterprise Cash Flow Projection - Residential Two Tier Rate Structure Hybrid Model Fiscal Year Ending June 30 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Assumptions:

Interest Earnings Rate 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% Revenue Increase from Growth [1] 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% Fixed Charge $28.85 $31.30 $33.80 $36.15 $38.70 $41.40 $43.05 $44.75 $46.55 $48.40 $50.35 Fixed Rate Adjustment 8.5% 8.0% 7.0% 7.1% 7.0% 4.0% 3.9% 4.0% 4.0% 4.0% SFR Variable Charge $6.60 $6.80 $7.02 $7.29 $7.56 $7.84 $8.17 $8.44 $8.72 $9.01 $9.31 Variable Rate Adjustment 3.0% 3.2% 3.8% 3.7% 3.7% 4.2% 3.3% 3.3% 3.3% 3.3% Monthly Service Charge Single Family (8 ccf) $81.65 $85.70 $89.96 $94.47 $99.18 $104.12 $108.41 $112.27 $116.31 $120.48 $124.83 Rate Adjustment 5.0% 5.0% 5.0% 5.0% 5.0% 4.1% 3.6% 3.6% 3.6% 3.6% Beginning Fund Balance $11,194,614 $10,550,000 $8,088,500 $5,985,400 $8,468,600 $7,154,900 $6,505,800 $6,364,800 $6,383,800 $6,592,800 $6,998,800 Revenues
Water Sales & Service Charges
Meter Charge Revenue Estimate 7,004,000 7,626,000 8,265,000 8,872,000 9,533,000 10,235,000 10,682,000 11,144,000 11,635,000 12,142,000 12,677,000 Volumetric Revenue Estimate 11,171,000 11,548,000 11,961,000 12,462,000 12,968,000 13,481,000 14,090,000 14,600,000 15,135,000 15,687,000 16,258,000 Debt Issuance / Interfund Loan 0 0 0 4,000,000 0 0 0 0 0 0 0 Connection Fees [1] 0 0 0 0 0 0 0 0 0 0 0
Interest Earnings - Operating Reserve [2] 336,000 317,000 243,000 180,000 254,000 215,000 195,000 191,000 192,000 198,000 210,000 Other 0 0 0 0 0 0 0 0 0 0 0
Operating Revenues 18,511,000 19,491,000 20,469,000 25,514,000 22,755,000 23,931,000 24,967,000 25,935,000 26,962,000 28,027,000 29,145,000 Expens es
Employee Services 2,956,001 3,387,751 3,523,261 3,664,191 3,810,759 3,963,190 4,122,000 4,287,000 4,458,000 4,636,000 4,821,000 Additional Cost 0 31,339 303,873 313,542 324,103 335,045 348,000 362,000 376,000 391,000 407,000 Internal Services - Others 1,244,701 1,449,956 1,486,205 1,523,360 1,561,444 1,600,480 1,640,000 1,681,000 1,723,000 1,766,000 1,810,000 Internal Services - ERF 456,767 396,971 406,895 417,068 427,494 438,182 449,000 460,000 472,000 484,000 496,000 Services & Supplies 817,062 979,062 1,003,539 1,028,627 1,054,343 1,080,701 1,108,000 1,136,000 1,164,000 1,193,000 1,223,000 SFPUC Water Purchases 10,467,000 10,814,000 10,966,000 11,119,000 11,742,000 12,727,000 13,218,000 13,728,000 14,258,000 14,808,000 15,380,000 BAWSCA Bond Repayment 601,416 670,356 675,000 675,000 675,000 675,000 675,000 675,000 675,000 675,000 675,000 Reallocation 1,362,521 1,373,045 1,407,371 1,442,555 1,478,619 1,515,585 1,553,000 1,592,000 1,632,000 1,673,000 1,715,000 Capital Outlay / Vehicles 0 0 0 0 0 0 0 0 0 0 0
Operating Expenses 17,905,468 19,102,480 19,772,144 20,183,343 21,073,763 22,335,182 23,113,000 23,921,000 24,758,000 25,626,000 26,527,000 Operating Net Revenues 605,532 388,520 696,856 5,330,657 1,681,237 1,595,818 1,854,000 2,014,000 2,204,000 2,401,000 2,618,000 Water Sustainability Fund Transfer 250,000 250, 000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 Capital Improvement Transfer [3] 1,000,000 2, 600,000 2,600,000 2,500,000 2,500,000 1,750,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Proj. Debt Service (6%, 1.5% issuance, 30yr) 0 0 0 147,477 294,955 294,955 294,955 294,955 294,955 294,955 294,955 Total Expenses 19,155,468 21,952,480 22,572,144 23,030,820 24,068,718 24,580,137 25,107,955 25,915,955 26,752,955 27,620,955 28,521,955 Revenues Les s O&M Expens es 605,532 388,520 696,856 5,330,657 1,681,237 1,595,818 1,854,000 2,014,000 2,204,000 2,401,000 2,618,000 Revenues Les s Total Expens es (644,468) (2,461,480) (2,103,144) 2,483,180 (1,313,718) (649,137) (140,955) 19,045 209,045 406,045 623,045 Ending Fund Balance 10,550,146 8,088,520 5,985,356 8,468,580 7,154,882 6,505,763 6,364,845 6,383,845 6,592,845 6,998,845 7,621,845 Revenue Tes t: Annual Revenues > O&M Expenses
Annual Revenues Less O&M Expenses 605,532 388,520 696,856 5,330,657 1,681,237 1,595,818 1,854,000 2,014,000 2,204,000 2,401,000 2,618,000 Pass/fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS Fund Reserve Test: Minimum Fund Balance > 25% O&M Expenses Year-end fund balance 10,550,146 8, 088,520 5,985,356 8,468,580 7,154,882 6,505,763 6,364,845 6,383,845 6,592,845 6,998,845 7,621,845 25% operating expenses 4,420,000 4,710,000 4,880,000 4,980,000 5,200,000 5,510,000 5,700,000 5,900,000 6,100,000 6,320,000 6,540,000 # of Days O&M in Reserves 215 155 110 153 124 106 101 97 97 100 105 Pass/fail PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS Debt Service Coverage 9.02 5.70 5.41 6.29 6.83 7.47 8.14 8.88 [1] Connection fees not included in this analysis
[2] Calculated as 3% of the Beginning Fund Balance of the Water Revenue Fund [3] Capital Improvements are funded through the Long-Term Capital Improvement Project Fund Five Year Projection Extended Year Projection

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

141

18 | Page

Table 6
City of Foster City / Estero Municipal Improvement District Water Rate Calculation - Two Tier Hybrid Model
F
iscal Year Ending June 30 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Fixed Meter Charge Increas e 8.50% 8.00% 7.00% 7.00% 7.00% 4.00% 4.00% 4.00% 4.00% 4.00% Fixed Revenues +/- 6% of Fixed Costs? YES YES YES YES YES YES YES YES YES YES Res erves % Above (Below) Res erve Target 171.7% 122.7% 170.1% 137.6% 118.1% 111.7% 108.2% 108.1% 110.7% 116.5% Res erve Target Met? YES YES YES YES YES YES YES YES YES YES Revenue Es timates
Meter Charge Revenue 7,004,000$ 7,626,000$ 8,265,000$ 8,872,000$ 9,533,000$ 10,235,000$ 10,682,000$ 11,144,000$ 11,635,000$ 12,142,000$ 12,677,000$ Other Fixed Revenue 336,000$ 317,000$ 243,000$ 180,000$ 254,000$ 215,000$ 195,000$ 191,000$ 192,000$ 198,000$ 210,000$ Volumetric Revenue 11,171,000$ 11,549,000$ 11,960,000$ 12,456,000$ 12,964,000$ 13,484,000$ 14,093,000$ 14,603,000$ 15,126,000$ 15,677,000$ 16,250,000$ Total Projected 18,511,000$ 19,492,000$ 20,468,000$ 21,508,000$ 22,751,000$ 23,934,000$ 24,970,000$ 25,938,000$ 26,953,000$ 28,017,000$ 29,137,000$ Total Projected Revenue (Rounded '000's) 18,511,000$ 19,492,000$ 20,468,000$ 21,508,000$ 22,751,000$ 23,934,000$ 24,970,000$ 25,938,000$ 26,953,000$ 28,017,000$ 29,137,000$ Revenue Allocation
Fixed 39.7% 40.8% 41.6% 42.1% 43.0% 43.7% 43.6% 43.7% 43.9% 44.0% 44.2% Variable 60.3% 59.2% 58.4% 57.9% 57.0% 56.3% 56.4% 56.3% 56.1% 56.0% 55.8% Costs Estima te s
Fixed Costs [1] $7,837,052 $10,218,124 $10,731,144 $11,036,820 $11,451,718 $10,978,137 $11,014,955 $11,312,955 $11,619,955 $11,937,955 $12,266,955 Variable Costs [2] $11,318,416
$11,734,356 $11,841,000 $11,994,000 $12,617,000 $13,602,000 $14,093,000 $14,603,000 $15,133,000 $15,683,000 $16,255,000 Total Projected Costs $19,155,468 $21,952,480 $22,572,144 $23,030,820 $24,068,718 $24,580,137 $25,107,955 $25,915,955 $26,752,955 $27,620,955 $28,521,955 Net Revenue
Fixed Charges -$497,052 -$2,275,124 -$2,223,144 -$1,984,820 -$1,664,718 -$528,137 -$137,955 $22,045 $207,045 $402,045 $620,045 Volumetric Charges -$147,416 -$185,356 $119,000 $462,000 $347,000 -$118,000 $0 $0 -$7,000 -$6,000 -$5,000 Total -$644,468 -$2,460,480 -$2,104,144 -$1,522,820 -$1,317,718 -$646,137 -$137,955 $22,045 $200,045 $396,045 $615,045 Cost Ana lysis
Fixed 40.9% 46.5% 47.5% 47.9% 47.6% 44.7% 43.9% 43.7% 43.4% 43.2% 43.0% Variable 59.1% 53.5% 52.5% 52.1% 52.4% 55.3% 56.1% 56.3% 56.6% 56.8% 57.0% Meter Charge Calculation
Monthly charge per meter equivalent 28.85$ 31.30$ 33.80$ 36.15$ 38.70$ 41.40$ 43.05$ 44.75$ 46.55$ 48.40$ 50.35$ (Rounded to nearest $0.05)
Annual charge per meter equivalent 346.20$ 375.60$ 405.60$ 433.80$ 464.40$ 496.80$ 516.60$ 537.00$ 558.60$ 580.80$ 604.20$ Meter equivalents [3] 20,229 20,303 20,377 20,452 20,527 20,602 20,677 20,753 20,829 20,905 20,982 Meter Charge Revenue Estimate 7,004,000$ 7,626,000$ 8,265,000$ 8,872,000$ 9,533,000$ 10,235,000$ 10,682,000$ 11,144,000$ 11,635,000$ 12,142,000$ 12,677,000$ Volumetric Rate Calculation
EMID Proposed Uniform Rate $6.72 6.92$ 7.14$ 7.41$ 7.68$ 7.96$ 8.29$ 8.56$ 8.83$ 9.12$ 9.42$ Projected annual water sales (ccf) [4] 1,662,412 1,669,000 1,675,000 1,681,000 1,688,000 1,694,000 1,700,000 1,706,000 1,713,000 1,719,000 1,725,000 Variable revenue estimate $11,171,000 $11,549,000 $11,960,000 $12,456,000 $12,964,000 $13,484,000 $14,093,000 $14,603,000 $15,126,000 $15,677,000 $16,250,000 % Spread between EMID and SFPUC
Surcharge 18.5% 19.5% 22.1% 25. 4% 23.5% 18.5% 19.2% 18.9% 18.5% 18.3% 18.0% SFPUC PROJECTED RATES $5.67 $5.79 $5.85 $5.91 $6.22 $6.72 $6.96 $7.20 $7.45 $7.71 $7.98 Increas e (Decreas e) % 2.1% 1.0% 1.0% 5.2% 8.0% 3.5% 3.5% 3.5% 3.5% 3.5% BAWSCA Surcharge $0.36 $0.36 $0.36 $0.36 $0.36 $0.36 $0.36 $0.36 $0.36 $0.36 $0.36 SFPUC Rate + BAWSCA Surcharge $6.03 $6.15 $6.21 $6.27 $6.58 $7.08 $7.32 $7.56 $7.81 $8.07 $8.34 EMID Fixed Meter Charge Increas e (Decreas e) 8.5% 8.0% 7.0% 7.1% 7.0% 4.0% 3.9% 4.0% 4.0% 4.0% EMID Volumetric Rate Increas e (Decreas e) 3.0% 3.2% 3.8% 3.6% 3.6% 4.1% 3.3% 3.2% 3.3% 3.3% Note:
[1] Includes: Employee Services, Internal Services - Other, Internal Services - ERF, Services & Supplies, Reallocation, Capital Outlay, Capital Improvement Fund Transfers, Debt Service, and net revenues for the operating fund. [2] Includes: SFPUC Water Purchases, BAWSCA Bond Repayment, and Water Sustainability Fund Transfers. [3] 0.37% growth estimated for planning purposes
[4] Includes 10% water loss factor
Five Year Projection Extended Year Projection

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

142

19 | Page

Table 7
City of Foster City / Estero Municipal Improvement District Proposed Water Rates - Two Tier Hybrid Model
Current
Rates FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 FY2035 Monthly Meter Charge
3/4" $28.85 $31.30 $33.80 $36.15 $38.70 $41.40 $43.05 $44.75 $46.55 $48.40 $50.35 1" 48.08 52.17 56.33 60.25 64.50 69.00 71.75 74.58 77.58 80.67 83.92 1-1/2" 115.40 125.20 135.20 144.60 154.80 165.60 172.20 179.00 186.20 193.60 201.40 2" 153.87 166.93 180.27 192.80 206.40 220.80 229.60 238.67 248.27 258.13 268.53 3" 336.58 365.17 394.33 421.75 451.50 483.00 502.25 522.08 543.08 564.67 587.42 4" 605.85 657.30 709.80 759.15 812.70 869.40 904.05 939.75 977.55 1,016.40 1,057.35 6" 1,346.33 1,460.67 1,577.33 1,687.00 1,806.00 1,932.00 2,009.00 2,088.33 2,172.33 2,258.67 2,349.67 8" or greater 2,308.00 2,504.00 2,704.00 2,892.00 3,096.00 3,312.00 3,444.00 3,580.00 3,724.00 3,872.00 4,028.00 Conservation-Based Water Rate Model (based on bi-monthly allotments)* Single Family Residential
Tier 1 0-20 per ccf 6.60 6.80 7.02 7.29 7.56 7.84 8.17 8.44 8.72 9.01 9.31 Tier 2 Over 20 ccf 7.33 7.56 7.79 8.08 8.34 8.59 8.92 9.19 9.46 9.75 10.05 Multi-Family Residential (per living unit)
Tier 1 0-10 ccf per living unit 6.60 6.80 7.02 7.29 7.56 7.84 8.17 8.44 8.72 9.01 9.31 Tier 2 Over 10 ccf per living unit 7.36 7.54 7.77 8.06 8.32 8.57 8.90 9.17 9.44 9.73 10.03 Irrigation Customers
Tier 1 <=100% of annual budget 6.60 6.80 7.02 7.29 7.56 7.84 8.17 8.44 8.72 9.01 9.31 Tier 2 >100% of annual budget 7.80 7.76 8.00 8.29 8.55 8.79 9.12 9.39 9.66 9.95 10.24 Commercial and Fire Line Customers
Base Consumption Rate 6.72 6.92 7.14 7.41 7.68 7.96 8.29 8.56 8.83 9.12 9.42 Monthly Fire Meter Charge
1-1/2" & below 40.39 43.82 47.32 50.61 54.18 57.96 60.27 62.65 65.17 67.76 70.49 2" 53.95 58.53 63.21 67.60 72.37 77.42 80.50 83.68 87.05 90.51 94.15 3" 117.71 127.70 137.90 147.49 157.90 168.91 175.64 182.58 189.92 197.47 205.43 4" 212.05 230.06 248.43 265.70 284.45 304.29 316.42 328.91 342.14 355.74 370.07 6" 471.12 511.13 551.95 590.33 631.97 676.06 703.01 730.77 760.16 790.37 822.22 8" or greater 807.80 876.40 946.40 1,012.20 1,083.60 1,159.20 1,205.40 1,253.00 1,303.40 1,355.20 1,409.80 (Minimum charge is equivalent to 1-1/2" meter charge)

TWO TIER HYBRID MODEL
Recommended Rates
*Recommended SFPUC wholesale rate pass through formula: (Additional SFPUC $ Amount Per HCF Above Study) / (0.9) added to each volumetric rate.

0.9 Accounts for 10% Water loss

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

143

20 | Page

Table 8
Foster City / Estero Municipal Improvement District
Projected Water Rate Impacts
Current FY2026
Rates Two Tier Hybrid Model
Monthly meter charge $28.85 $31.30
% Change 8.5%
Single Family Residential
Bi-Monthly Tiers
Tier 1: 0 to 20 ccf $6.60 $6.80
Tier 2: over 20 ccf $7.33 $7.56
Water Monthly
Use Level Use (ccf) Monthly Bill
Low User 5 $61.85 $65.30
$ Increase 3.45
% Increase 5.6%
Median Us er 6 $68.45 $72.10
$ Increase 3.65
% Increase 5.3%
Average Us er 8 $81.65 $85.70
$ Increase 4.05
% Increase 5.0%
High User 10 $94.85 $99.30
$ Increase 4.45
% Increase 4.7%
Very High User 20 $160.85 $174.90
$ Increase 14.05
% Increase 8.7%
Exces s ive Us er 50 $380.75 $401.70
$ Increase 20.95
% Increase 5.5%

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

144

21 | Page

Table 9
Foster City / Estero Municipal Improvement District
P
rojected Water Rate Impacts
Current
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Two Tier Hybrid Model
Single Family Residential Monthly Rate $81.65 $85.70 $89.96 $94.47 $99.18 $104.12 $108.41 $112.27 $116.31 $120.48 $124.83 $ Increase 4.05 4.26 4.51 4.71 4.94 4.29 3.86 4.04 4.17 4.35 % Increase 5.0% 5.0% 5.0% 5.0% 5.0% 4.1% 3.6% 3.6% 3.6% 3.6% Based on Single Family Residential Use of 8 ccf
Fiscal Year Ending June 30 Extended Year ProjectionProjected Water Bills

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

145

22 | Page

APPENDIX D

4.4 Attachment 1 - Bartle Wells Associates Water Rate Study Update Results Memo dated March 19, 2025

146

Page 1 of 10 ends
← All documents from this meeting