Cities Index.
Agenda

Fountain Valley City Council
June 4, 2024

Document
Agenda
Meeting
June 4, 2024
Body
Fountain Valley City Council
Pages
544
Original file
26.8 MB
Text extracted from the city's file for reading and search. Open the original on www.fountainvalley.gov. That file is the official record.
Page 84 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Name Order (A-Z)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 723 10667 SANTA CRUZ CIR HUMMINGBIRD AVE NORTH END E B7 462 33 16,766 4/25/22 76 82 18 0 Overlay - AC Structural 7/1/11 724 10668 SANTA DOMINGO CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 73 79 21 0 Overlay - AC Structural 7/1/11 1001 10958 SANTA ELENA CIR EL CAPITAN AVE END E B5 421 33 17,493 4/28/22 86 83 17 0 Overlay - AC Structural 7/1/11 1002 10986 SANTA ELENA ST EL PRESIDENTE AVE EL CAPITAN AVE E C5 583 36 20,988 4/28/22 86 76 24 0 Overlay - AC Structural 7/1/10 725 10669 SANTA ELISE ST EL PRESIDENTE AVE EL LAGO AVE E B5 288 36 13,968 4/28/22 81 78 22 0 Overlay - AC Structural 7/1/11 726 10670 SANTA EUGENIA ST THAMES RIVER AVE SEINE RIVER AVE E B6 500 35 21,100 4/25/22 80 76 20 4 Overlay - AC Structural 7/1/11 727 10671 SANTA FE CIR LA ROCA AVE NORTH END E B5 380 33 12,540 4/29/22 91 100 0 0 Overlay - AC Structural 7/1/11 728 10672 SANTA GERTRUDES CIR LA ROCA AVE NORTH END E B5 373 33 12,540 4/29/22 89 81 19 0 Overlay - AC Structural 7/1/11 729 10673 SANTA IRENE ST CANARY AVE SUNBIRD AVE E B7 371 36 14,292 4/1/22 78 87 13 0 Overlay - AC Structural 7/1/11 730 10674 SANTA ISABEL ST EL LIBRO AVE EL RANCHO AVE E B4 2,002 36 75,672 3/14/23 79 53 25 22 Surface Treatment - Slurry Seal 6/13/08 7001 10829 SANTA ISADORA CIR SOUTH END WOODPECKER AVE E B7 272 33 10,496 4/1/22 85 80 20 0 Overlay - AC Structural 7/1/11 732 10675 SANTA ISADORA ST WOODPECKER AVE ELLIS AVE E B7 2,301 36 86,296 4/1/22 85 80 20 0 Overlay - AC Structural 7/1/11 732 10676 SANTA ISADORA ST ELLIS AVE PHOENIX AVE E B6 510 36 20,160 4/1/22 82 72 28 0 Overlay - AC Structural 7/1/11 733 10677 SANTA JOANANA CIR SOUTH END RHINE RIVER AVE E B6 1,061 33 38,073 4/25/22 74 84 16 0 Overlay - AC Structural 7/1/11 734 10678 SANTA LAURETTA ST TRINITY RIVER CIR NORTH END E B6 1,187 36 45,777 4/6/22 78 83 17 0 Overlay - AC Structural 7/1/11 735 10679 SANTA LEONORA CIR ELLIS AVE NORTH END E B6 555 33 21,375 4/25/22 73 78 22 0 Overlay - AC Structural 7/1/11 737 10680 SANTA LUCIA ST SOUTH END EL RANCHO AVE E B4 320 36 12,776 3/14/23 69 27 73 0 Overlay - AC Structural 1/1/07 737 10681 SANTA LUCIA ST SLATER AVE NORTH END E B4 1,591 36 60,336 3/14/23 88 92 0 8 Overlay - AC Structural 1/1/07 738 10682 SANTA MADRINA CIR SOUTH END SWALLOW AVE E B7 600 36 23,120 4/6/22 82 100 0 0 Overlay - AC Structural 7/1/11 739 10683 SANTA MADRINA ST LA CASITA AVE EL RANCHO AVE E B4 732 36 30,552 3/14/23 69 45 55 0 Surface Treatment - Slurry Seal 6/13/08 741 10684 SANTA MARIA ST EL ARROYO AVE SLATER AVE E B5 1,169 36 42,084 4/28/22 73 82 18 0 Overlay - AC Structural 7/1/11 741 10685 SANTA MARIA ST SLATER AVE LA BAYA AVE E B4 1,131 36 39,852 5/14/24 71 74 16 10 Surface Treatment - Slurry Seal 6/13/08 743 10686 SANTA MARIANA ST TERN DR SUNBIRD AVE E B7 1,621 36 60,228 4/1/22 83 89 11 0 Overlay - AC Structural 7/1/11 743 10687 SANTA MARIANA ST TALBERT AVE LA ROCA AVE E B5 811 36 30,202 4/28/22 80 77 23 0 Overlay - AC Structural 7/1/11 744 10688 SANTA MARTA ST TERN AVE NIGHTINGALE AVE E B7 1,011 36 36,396 4/1/22 79 85 15 0 Overlay - AC Structural 7/1/11 745 10689 SANTA MONICA CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 66 85 15 0 Overlay - AC Structural 7/1/11 746 10690 SANTA OLIVIA ST TALBERT AVE SWORDFISH AVE E B5 511 36 18,396 4/29/22 86 75 25 0 Overlay - AC Structural 7/1/11 747 10691 SANTA PAULA CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 71 80 20 0 Overlay - AC Structural 7/1/11 1600 10827 SANTA PAULA ST EL LAGO AVE EL CAPITAN AVE E B5 296 36 10,656 4/28/22 81 74 26 0 Overlay - AC Structural 7/1/11 748 10692 SANTA RAMONA ST SOUTH END WREN AVE E B7 836 36 31,948 4/25/22 79 86 14 0 Overlay - AC Structural 7/1/11 749 10693 SANTA RITA ST LA CASITA AVE EL RANCHO AVE E B4 751 36 29,136 5/14/24 71 37 63 0 Surface Treatment - Slurry Seal 6/13/08 750 10694 SANTA ROSA CIR EL PRESIDENTE AVE NORTH END E B5 310 33 13,290 4/28/22 75 71 29 0 Overlay - AC Structural 7/1/11 751 10695 SANTA ROSALIA ST EL CAPITAN AVE SLATER AVE E B5 589 33 19,437 4/28/22 64 55 45 0 Overlay - AC Structural 7/1/11 752 10696 SANTA SOPHIA CIR SOUTH END RHINE RIVER AVE E B6 455 33 16,271 4/29/22 68 90 0 10 Overlay - AC Structural 7/1/11 753 10697 SANTA STEPHANA CIR SOUTH END MACKENZIE RIVER AVE E B6 501 33 19,593 4/25/22 72 85 15 0 Overlay - AC Structural 7/1/11 754 10698 SANTA SUZANNE ST LA COLONIA AVE EL RANCHO AVE E B4 2,016 36 74,376 5/13/24 74 47 53 0 Overlay - AC Structural 1/1/07 755 10699 SANTA TERESA CIR EL PRESIDENTE AVE NORTH END E B5 310 33 13,290 4/28/22 71 59 39 2 Overlay - AC Structural 7/1/11 756 10700 SANTA TOMASA CIR HUMMINGBIRD AVE NORTH END E B7 464 33 16,832 4/25/22 79 91 9 0 Overlay - AC Structural 7/1/11 757 10701 SANTA VALERA ST LA ROCA AVE SALMON AVE E B5 608 36 21,888 4/29/22 85 75 25 0 Overlay - AC Structural 7/1/11 758 10702 SANTA VERONICA CIR ELLIS AVE NORTH END E B6 555 33 21,375 4/25/22 80 71 29 0 Overlay - AC Structural 7/1/11 759 10703 SANTA YNEZ ST NIGHTENGALE AVE WREN AVE E B7 1,273 36 46,764 4/1/22 83 89 11 0 Overlay - AC Structural 7/1/11 760 10704 SANTA YOLANDA CIR THAMES RIVER AVE NORTH END E B6 448 33 17,844 4/25/22 71 89 11 0 Overlay - AC Structural 7/1/11 761 10705 SARA RIVER CIR WEST END MT. STEWART CIR E C6 319 32 11,464 4/29/22 81 76 24 0 Surface Treatment - Slurry Seal 7/1/23 762 10706 SCOTCH PINE ST BUTTERCUP AVE HONEYSUCKLE AVE E C2 1,273 36 49,588 4/22/24 87 95 0 5 Surface Treatment - Slurry Seal 5/31/01 763 10707 SECOND ST HELM AVE TALBERT AVE E C6 1,349 36 49,500 4/22/22 81 73 27 0 Surface Treatment - Slurry Seal 7/1/23 764 10708 SEINE RIVER AVE SANTA CARLOTTA ST SANTA EUGENIA ST E B6 246 36 10,656 4/25/22 79 83 17 0 Overlay - AC Structural 7/1/11 765 10709 SEQUOIA ST PETUNIA AVE ZINNIA AVE E D3 1,031 36 38,996 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 766 10710 SHADBUSH ST DANDELION AVE GLADIOLA AVE E D2 1,025 36 36,900 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 767 10711 SHAMROCK AVE BUSHARD ST BANANA ST E D2 1,830 36 67,760 4/26/24 82 66 0 34 Surface Treatment - Slurry Seal 12/1/21 768 10712 SHANNON RIVER CIR WEST END SANTA ARABELLA ST E B6 504 33 19,692 4/6/22 72 93 7 0 Overlay - AC Structural 7/1/11 769 10713 SHASTA ST CATSKILL AVE AZALEA AVE E H2 2,548 33 85,964 3/6/23 93 86 0 14 Overlay - AC Structural 8/31/18 770 10714 SHENANDOAH ST ADOBE RIVER AVE NORTH END E E6 724 33 26,404 3/7/23 94 100 0 0 Overlay - AC Structural 6/1/12 772 10716 SHIMIZU RIVER CIR WEST END PERSIMMON CIR E D7 686 33 24,158 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 773 10717 SHRIKE AVE DATE ST DEODAR ST E C7 731 36 28,188 4/21/22 85 100 0 0 Surface Treatment - Slurry Seal 7/1/23 774 10718 SHRINER CIR WINEMAST ST WEST END E D4 411 36 18,151 4/21/21 77 92 0 8 Surface Treatment - Slurry Seal 5/31/01 775 10719 SIERRA ST AZALEA AVE ORCHID AVE E H2 1,500 36 55,880 4/23/24 92 100 0 0 Overlay - AC Structural 8/31/18 776 10720 SIGMOND CIR SOUTH END RHOADS CIR E B6 298 33 14,694 4/25/22 77 87 13 0 Overlay - AC Structural 7/1/11

Page 17 of 20 ends
Page 85 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Name Order (A-Z)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 777 10721 SILKTREE ST MARIPOSA AVE NORTH END E D3 1,720 36 63,395 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 778 10722 SIOUX RIVER CIR STANISLAUS ST EAST END E E6 621 33 21,749 3/7/23 83 97 0 3 Overlay - AC Structural 6/1/12 779 10723 SISKIN AVE PLUMOSA ST PRUNUS ST E C7 986 36 36,432 4/21/22 81 100 0 0 Surface Treatment - Slurry Seal 7/1/23 780 10724 SITKA CIR MT. COULTER ST EAST END E D5 144 42 6,754 4/21/21 87 100 0 0 Surface Treatment - Slurry Seal 5/31/01 1003 10962 SLATER FRONTAGE #1 SLATER AVE WEST END E F5 211 29 7,542 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 1050 10961 SLATER FRONTAGE #2 WEST END EAST END E F4 800 29 25,778 3/22/23 87 100 0 0 Overlay - AC Structural 6/1/15 1051 10960 SLATER FRONTAGE #3 WEST END EAST END E F4 315 29 11,713 3/22/23 89 100 0 0 Overlay - AC Structural 6/1/15 9007 10848 SLATER FRONTAGE #4 LOS JARDINES EAST FR EAST END E F5 350 26 9,850 3/22/23 89 75 0 25 Overlay - AC Structural 6/1/15 940 10896 SMOKE RIVER CT END ANTELOPE RIVER AVE E E6 185 22 4,070 3/7/23 91 66 34 0 Overlay - AC Structural 6/1/12 784 10725 SMOKE TREE AVE BUSHARD ST PERSIMMON CIR E D7 1,131 36 40,716 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 785 10726 SNOWDROP AVE MT. NIMBUS ST VERNON ST E G2 1,289 36 46,404 4/27/21 97 89 0 11 Overlay - AC Structural 6/1/17 986 10943 SOLANO RIVER CT ELK RIVER CT STONE RIVER CT E E6 177 22 3,894 3/7/23 87 47 53 0 Overlay - AC Structural 6/22/12 787 10727 SORREL ST SHAMROCK AVE MESQUITE ST E D2 383 36 13,788 4/22/24 86 100 0 0 Surface Treatment - Slurry Seal 12/1/21 788 10728 SOUTHPARK AVE EUCLID ST NEWHOPE ST I G5 780 46 35,880 4/25/24 68 93 0 7 New Construction - Initial 1/1/80 789 10729 SPARKLEBERRY ST LA CAPILLA AVE LA ESPERANZA AVE E D4 506 36 20,096 4/14/22 83 80 20 0 Surface Treatment - Slurry Seal 5/31/01 790 10730 SPENCER AVE MT. LANGLEY ST PACIFIC ST I F6 1,131 46 52,026 4/22/21 100 100 0 0 Overlay - AC Structural 8/1/09 793 10731 SPRUCE CIR ROSE AVE NORTH END E D3 405 33 14,840 4/22/21 85 100 0 0 Surface Treatment - Slurry Seal 9/1/22 793 10732 SPRUCE CIR ROBIN AVE NORTH END E D7 423 33 15,215 4/23/24 97 97 0 3 Overlay - AC Structural 8/1/20 793 10733 SPRUCE CIR MARIGOLD AVE NORTH END E D2 98 36 5,003 4/22/24 87 100 0 0 Surface Treatment - Slurry Seal 12/1/21 795 10734 SPRUCE ST HEIL AVE GARDENIA AVE E D3 518 36 18,648 4/22/24 83 100 0 0 Surface Treatment - Slurry Seal 9/1/22 795 10735 SPRUCE ST HEIL AVE MARIGOLD AVE E D2 783 36 28,188 4/22/24 84 87 0 13 Surface Treatment - Slurry Seal 12/1/21 973 10929 STAEDLER CIR STAEDLER ST END E F4 238 36 12,168 3/22/23 80 66 34 0 Overlay - AC Structural 6/1/15 974 10930 STAEDLER ST EL SILBIDO AVE STAEDLER CIR E F4 250 36 9,000 3/22/23 85 100 0 0 Overlay - AC Structural 6/1/15 797 10736 STANISLAUS ST PLACER RIVER CIR APACHE RIVER AVE E E6 979 36 35,244 3/7/23 81 62 0 38 Overlay - AC Structural 6/22/12 798 10737 STARFISH AVE BANYAN ST SLATER AVE E D4 898 28 26,734 4/21/21 86 88 12 0 Surface Treatment - Slurry Seal 6/1/01 799 10738 STARLING AVE BUSHARD ST REDWOOD CIR E D7 1,163 36 41,868 4/23/24 97 100 0 0 Overlay - AC Structural 8/1/20 800 10739 STILBITE AVE BROOKHURST ST MAIDSTONE ST E E1 1,171 36 42,156 4/21/21 100 0 0 0 Overlay - AC Structural 8/1/20 949 10904 STONE RIVER CT END END E E6 147 21 3,087 3/7/23 92 87 13 0 Overlay - AC Structural 6/22/12 802 10740 STONECRESS AVE EUCLID ST MT. SHELLY CIR E G3 2,726 36 100,016 4/26/24 85 85 14 1 Overlay - AC Structural 6/1/16 803 10741 STURGEON AVE FREMONT ST TOIYABE ST E D5 643 36 24,084 4/21/21 88 80 20 0 Surface Treatment - Slurry Seal 6/1/01 804 10742 SUDITH AVE MT. VICTORY ST MT. FLETCHER CIR E G3 992 36 36,712 4/26/24 81 91 0 9 Overlay - AC Structural 6/1/16 805 10743 SUGARLOAF ST HEIL AVE STONECRESS AVE E G3 1,063 36 38,268 4/26/21 87 91 0 9 Overlay - AC Structural 6/1/16 806 10744 SUNBIRD AVE SANTA MARIANA ST SANTA IRENE ST E B7 545 36 21,492 4/1/22 81 100 0 0 Overlay - AC Structural 7/1/11 807 10745 SUNN AVE LOS COCHES ST MAIDSTONE ST E E1 545 36 21,500 4/21/21 100 62 38 0 Overlay - AC Structural 8/1/20 808 10746 SUNN CIR LOS COCHES ST WEST END E E1 228 33 8,999 4/21/21 100 48 52 0 Overlay - AC Structural 8/1/20 809 10987 SUNSET CT NAPA RIVER CT DURANGO RIVER CT E E6 389 22 8,558 3/7/23 92 100 0 0 Overlay - AC Structural 6/1/12 810 10747 SUZETTE RIVER CIR NEWHOPE ST WEST END E H2 293 33 11,144 4/27/21 90 97 0 3 Overlay - AC Structural 6/1/17 811 10748 SWALLOW AVE SANTA MARTA ST SANTA BARBARA ST E B7 1,203 36 44,244 4/22/22 100 90 10 0 Overlay - AC Structural 7/1/11 811 10749 SWALLOW AVE PALM ST ACACIA ST E C7 605 36 23,652 4/22/22 84 84 16 0 New Construction - Initial 1/1/80 811 10750 SWALLOW AVE SAN FELIPE ST SAN BLAS ST E E7 729 36 27,180 4/26/24 83 59 41 0 Surface Treatment - Slurry Seal 6/13/08 814 10751 SWAN CIR JACARANDA ST EAST END E D6 424 32 14,824 4/25/24 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 815 10752 SWEETLEAF ST EDINGER AVE HONEYSUCKLE AVE E C2 1,156 36 41,616 4/22/24 91 100 0 0 Surface Treatment - Slurry Seal 6/2/01 816 10753 SWIFT AVE REDBUD CIR BUSHARD ST E C6 469 36 17,820 4/25/22 83 66 34 0 New Construction - Initial 1/1/80 817 10754 SWORDFISH AVE SANTA VALERIA ST MAGNOLIA ST E B5 1,169 36 42,084 4/28/22 79 49 51 0 Overlay - AC Structural 7/1/11 818 10755 SYCAMORE ST HEIL AVE HIBISCUS AVE E D2 1,680 36 60,480 4/22/24 87 100 0 0 Surface Treatment - Slurry Seal 12/1/21 819 10756 SYLVANITE CIR MT. EDEN ST EAST END E G3 410 36 16,235 4/26/21 84 85 15 0 Overlay - AC Structural 6/1/16 820 10757 TAHOE CIR SOUTH END ELLIS AVE E D7 285 33 10,661 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 821 10758 TAHOMA ST WARNER AVE EMMONS CIR E D3 484 33 17,852 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 1007 10966 TALBERT FRONTAGE #1 BAY ST EAST END E C5 457 26 12,827 4/25/22 84 100 0 0 Overlay - AC Structural 6/1/10 822 10759 TALBERT FRONTAGE #2 BRIAR ST LEMON ST E D6 997 27 26,919 4/24/24 86 100 0 0 Surface Treatment - Slurry Seal 7/1/23 824 10760 TAMARIND ST ELLIS AVE TOUCAN CIR E C7 1,161 36 41,796 4/23/24 85 100 0 0 Surface Treatment - Slurry Seal 7/1/23 825 10761 TANAGER AVE PLUMOSA ST BUSHARD ST E C7 1,135 36 42,708 4/21/22 90 96 0 4 Surface Treatment - Slurry Seal 7/1/23 826 10762 TANNAS AVE MT. YOUNIS ST MT. HUTCHINGS ST E H3 383 35 13,905 4/23/24 92 100 0 0 Overlay - AC Structural 8/30/19 827 10763 TEAK CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 90 100 0 0 Overlay - AC Structural 5/1/08 828 10764 TEAL CIR SAN ANTONIO ST EAST END E E7 463 32 16,072 4/26/24 57 29 71 0 Surface Treatment - Slurry Seal 6/13/08 829 10765 TEAPA CIR LA MARQUESA AVE NORTH END E F5 120 33 5,435 3/22/23 92 100 0 0 Overlay - AC Structural 6/1/15 830 10766 TERN AVE SANTA MARIANA ST SANTA MARTA ST E B7 271 36 11,628 4/1/22 79 91 9 0 Overlay - AC Structural 7/1/11

Page 18 of 20 ends
Page 86 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Name Order (A-Z)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 831 10767 TERREL ST HEIL AVE WISTERIA AVE E H3 1,180 36 42,980 4/22/24 91 91 0 9 Overlay - AC Structural 8/30/19 832 10768 TETON CIR SOUTH END EAGLE AVE E E7 404 36 15,800 4/24/24 75 78 8 14 Overlay - AC Structural 6/13/08 833 10769 THAMES RIVER AVE SANTA EUGENIA ST SANTA BELINDA CIR E B6 496 36 21,456 4/25/22 83 79 21 0 Overlay - AC Structural 7/1/11 834 10770 THIRD ST HELM AVE TALBERT AVE E C6 1,321 36 47,556 4/22/22 83 85 15 0 Surface Treatment - Slurry Seal 7/1/23 835 10771 THISTLE AVE SHADBUSH ST BROOKHURST ST E D2 578 36 20,808 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 836 10772 THRUSH AVE SAN ANTONIO ST WARD ST E E7 527 36 18,972 4/24/24 86 96 0 4 Overlay - AC Structural 6/13/08 837 10773 THYME AVE CACHE ST GALLATIN ST E C2 750 36 30,760 4/22/24 90 100 0 0 New Construction - Initial 1/1/80 838 10774 TILTON CIR EUCLID ST EAST END E G3 592 36 22,787 4/25/24 81 78 15 7 Overlay - AC Structural 6/1/16 839 10775 TIN MOUNTAIN CIR SANDSTONE AVE NORTH END E G3 425 36 16,775 4/26/21 87 94 0 6 Overlay - AC Structural 6/1/16 7012 10840 TOIYABE CIR SOUTH END HAMILTON AVE E D5 243 33 9,275 4/21/21 88 93 0 7 New Construction - Initial 1/1/80 840 10776 TOIYABE ST HAMILTON AVE STURGEON AVE E D5 944 36 30,920 4/21/21 82 61 36 3 New Construction - Initial 1/1/80 841 10777 TOMAHAWK ST WOODPECKER AVE BLUEBIRD AVE E B7 821 36 29,556 4/6/22 82 82 18 0 Overlay - AC Structural 7/1/11 842 10778 TOPAZ AVE MT. DUNHAVEN ST WEST END E G2 130 33 6,170 4/27/21 94 88 0 12 Overlay - AC Structural 6/1/17 844 10779 TOUCAN AVE COLVILLE ST BUSHARD ST E C6 1,110 36 40,896 4/21/22 86 86 14 0 Surface Treatment - Slurry Seal 7/1/23 844 10780 TOUCAN AVE BUSHARD ST JACARANDA ST E D6 1,455 36 52,380 4/25/24 94 100 0 0 Surface Treatment - Slurry Seal 7/1/23 7008 10836 TOUCAN CIR JACARANDA ST EAST END E D6 420 33 15,116 4/25/24 85 73 27 0 Surface Treatment - Slurry Seal 7/1/23 845 10781 TRADEWINDS ST SLATER AVE AMBERWOOD CIR E E5 210 32 6,720 3/2/23 89 44 0 56 Surface Treatment - Slurry Seal 7/1/23 846 10782 TRILLIUM AVE REDWOOD ST SILKTREE ST E D3 268 36 9,648 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 847 10783 TRINITY RIVER CIR NEWLAND ST EAST END E B6 591 33 22,563 4/6/22 76 86 14 0 Overlay - AC Structural 7/1/11 964 10919 TRUCKEE RIVER CT FIRESTONE CT YELLOWSTONE CT E E6 565 22 12,430 3/7/23 67 28 72 0 Overlay - AC Structural 6/1/12 849 10784 TULE RIVER CIR WEST END SANTA ISADORA ST E B7 144 30 5,076 4/1/22 81 78 22 0 Overlay - AC Structural 7/1/11 850 10785 TURTLEDOVE AVE BRIAR ST LEMON ST E D6 972 36 35,928 4/24/24 86 100 0 0 Surface Treatment - Slurry Seal 7/1/23 851 10786 TWINSPAN AVE MT. NIMBUS CT MT. BODIE ST E G2 573 36 22,508 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 852 10787 VACAS CIR LA MARQUESA AVE NORTH END E F5 166 33 6,953 3/22/23 93 100 0 0 Overlay - AC Structural 6/1/15 853 10788 VERNON ST PRIMROSE AVE IVORY AVE E G2 1,161 36 43,676 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 854 10789 VIOLET CIR SAN JACINTO ST EAST END E H2 376 33 13,883 4/23/24 92 100 0 0 Overlay - AC Structural 8/31/18 855 10790 VIREO CIR LOS CANARIOS ST EAST END E E6 396 33 14,324 3/7/23 84 74 26 0 Overlay - AC Structural 6/1/12 856 10791 VIRGINIA CIR PACIFIC ST EAST END I F6 348 36 13,784 4/22/21 68 39 25 36 Overlay - AC Structural 8/1/09 857 10792 VOLGA RIVER CIR SANTA LAURETTA CIR EAST END E B6 420 33 16,920 4/25/22 77 84 16 0 Overlay - AC Structural 7/1/11 858 10793 WADE RIVER CIR WEST END SANTA ISADORA ST E B7 144 30 4,320 4/1/22 79 100 0 0 Overlay - AC Structural 7/1/11 859 10794 WAGNER RIVER CIR MT. KRISTINA ST EAST END E C6 621 32 21,128 4/25/22 77 80 20 0 Surface Treatment - Slurry Seal 7/1/23 860 10795 WALNUT ST HEIL AVE GARDENIA AVE E C3 510 36 18,360 3/6/23 92 100 0 0 Surface Treatment - Slurry Seal 1/1/07 860 10796 WALNUT ST LA COLONIA AVE EL CORTEZ AVE E C4 1,893 36 69,548 3/8/23 91 100 0 0 New Construction - Initial 1/1/80 860 10797 WALNUT ST ORIOLE AVE COCKATOO AVE E C7 1,028 36 38,880 4/22/22 76 100 0 0 New Construction - Initial 1/1/80 860 10798 WALNUT ST EL MORADO AVE EL COLORADO AVE E C5 990 36 39,840 4/29/22 90 73 22 5 Overlay - AC Structural 6/1/10 864 10799 WARBLER AVE DATE ST CAPENSE ST E C7 960 36 36,432 4/21/22 85 87 13 0 Surface Treatment - Slurry Seal 7/1/23 867 10801 WARNER FRONTAGE #1 GREENLEAF ST WEST END E D4 480 27 15,172 4/14/22 85 100 0 0 New Construction - Initial 1/1/80 866 10800 WARNER FRONTAGE #2 MT. HOPE ST EAST END E G3 615 33 20,910 4/25/24 84 100 0 0 Overlay - AC Structural 6/1/16 868 10802 WARWICK CIR WINDSOR AVE NORTH END E C5 397 33 17,961 4/29/22 91 76 24 0 Overlay - AC Structural 6/1/10 869 10803 WASHBURN ST DELPHINIUM AVE EDINGER AVE E G2 513 36 18,468 4/27/21 92 100 0 0 Overlay - AC Structural 6/1/17 870 10804 WATERTON ST ANGEL AVE CHINOOK AVE E F5 409 33 13,497 3/2/23 90 77 0 23 Overlay - AC Structural 6/1/15 871 10805 WATT RIVER AVE COLVILLE ST GIFFORD ST E C6 294 36 11,520 4/21/22 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 872 10806 WAXWING CIR SAN ANTONIO ST EAST END E E7 471 32 16,328 4/26/24 69 42 39 19 Surface Treatment - Slurry Seal 6/13/08 873 10807 WEARE AVE OVERTON ST CLARENDON ST E D1 498 36 19,808 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 874 10808 WENDY CIR DAISY AVE CDS E C3 214 33 8,537 3/6/23 90 100 0 0 Overlay - AC Structural 6/13/08 877 10810 WHITE RIVER CIR WEST END MT. CIMMARON ST E D7 222 33 9,838 4/23/24 96 68 0 32 Overlay - AC Structural 8/1/20 878 10811 WHITECAP CIR ROSEMARY AVE SOUTH END E H2 212 33 8,471 3/6/23 93 100 0 0 Overlay - AC Structural 8/31/18 876 10809 WHITEFISH CIR NEWLAND ST EAST END E B5 626 33 23,718 4/28/22 76 76 24 0 Overlay - AC Structural 7/1/11 879 10812 WILLOW CIR DAISY AVE CDS E C3 395 36 15,695 3/6/23 87 73 0 27 Overlay - AC Structural 6/13/08 880 10813 WINDSOR AVE MAGNOLIA ST WARWICK CIR E C5 543 36 21,348 4/29/22 88 82 18 0 Overlay - AC Structural 6/1/10 881 10814 WINEMAST ST STARFISH AVE SHRINER CIR E D4 554 36 21,824 4/21/21 84 75 24 1 New Construction - Initial 1/1/80 886 10819 WINTERBERRY ST LA CRESCENTA AVE NORTH END E C5 501 33 16,533 4/29/22 85 73 27 0 Overlay - AC Structural 6/1/10 882 10815 WINTERGREEN CIR SWEETLEAF ST WEST END E C2 581 33 20,648 4/22/24 94 100 0 0 New Construction - Initial 1/1/80 883 10816 WINTERSBURG AVE WARNER AVE MT. HUTCHINGS ST E H3 780 36 28,080 4/29/22 98 100 0 0 New Construction - Initial 1/1/80 884 10817 WINTHROP CIR TAHOMA ST WEST END E D3 466 33 16,853 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 885 10818 WISTERIA AVE TERREL ST LASSEN ST E H3 767 36 28,612 4/22/24 89 69 0 31 Overlay - AC Structural 8/30/19 887 10820 WOODPECKER AVE SANTA ISADORA ST DAKOTA ST E B7 380 36 14,616 4/6/22 83 89 0 11 Overlay - AC Structural 7/1/11

Page 19 of 20 ends
Page 87 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Name Order (A-Z)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 888 10821 WOODRIDGE CIR MARIPOSA AVE NORTH END E D3 350 33 13,025 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 889 10822 WREN AVE SANTA YNEZ ST SANTA RAMONA ST E B7 279 36 10,980 4/25/22 80 73 25 2 Overlay - AC Structural 7/1/11 7002 10830 WREN CIR SANTA RAMONA ST EAST END E B7 442 33 16,106 4/25/22 78 77 20 3 Overlay - AC Structural 7/1/11 998 10955 YELLOWSTONE CT RIO GRANDE CT TRUCKEE RIVER CT E E6 264 21 5,544 3/7/23 87 100 0 0 Overlay - AC Structural 6/1/12 962 10917 YOSEMITE CT DURANGO RIVER CT END E E6 261 22 5,742 3/7/23 90 92 8 0 Overlay - AC Structural 6/1/12 892 10823 YOUNG RIVER AVE MT. WYNNE CIR MT. HERRMANN ST I G4 512 42 21,879 4/26/21 78 80 19 1 Overlay - AC Structural 8/1/09 893 10824 YUBA RIVER AVE SANTA RAMONA ST MAGNOLIA ST E B7 518 36 18,648 4/25/22 83 76 24 0 Overlay - AC Structural 7/1/11 894 10825 YUCCA CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 78 51 49 0 Overlay - AC Structural 6/13/08 895 10826 ZINNIA AVE SEQUOIA ST APPLE ST E D3 260 36 11,240 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 960 10915 ZION CT END END E E6 231 21 4,851 3/7/23 91 100 0 0 Overlay - AC Structural 6/1/12 110.6 21,602,659

Page 20 of 20 ends
Page 88 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date Arterials / Collectors (MPAH)
3014 33A WARNER AVE ROSS ST MAGNOLIA ST B ~ 1,470 12 17,640 1/26/24 45 28 62 10 New Construction - Initial 1/1/80 3014 33B WARNER AVE ROSS ST NEWLAND ST B ~ 1,185 42 49,770 1/26/24 46 13 64 23 New Construction - Initial 1/1/80 3014 24D WARNER AVE BROOKHURST ST BUSHARD ST B ~ 2,585 42 119,380 1/26/24 47 27 70 3 New Construction - Initial 1/1/80 3014 22A WARNER AVE NEWLAND ST ROSS ST B ~ 1,160 12 16,420 1/26/24 48 26 74 0 New Construction - Initial 1/1/80 3014 22B WARNER AVE BUSHARD ST BROOKHURST ST B ~ 2,585 42 124,211 1/26/24 51 23 77 0 New Construction - Initial 1/1/80 3008 3E MAGNOLIA ST HEIL AVE EDINGER AVE A ~ 2,687 12 31,944 3/6/24 55 53 26 21 Overlay - AC Structural 6/9/08 3004 8D EUCLID ST SLATER AVE SOUTH PARK AVE C ~ 1,754 32 60,830 3/6/24 58 51 48 1 New Construction - Initial 1/1/80 3002 26A EDINGER AVE MAGNOLIA ST BUSHARD ST A ~ 2,605 64 164,320 3/6/24 63 59 38 3 Overlay - AC Structural 5/25/02 3003 15B ELLIS AVE BUSHARD ST BROOKHURST ST C ~ 2,600 60 157,386 2/28/24 63 44 56 0 Overlay - AC Structural 6/9/08 3012 18B TALBERT AVE BROOKHURST ST BUSHARD ST B ~ 2,585 32 88,942 5/14/24 64 42 45 13 Overlay - AC Structural 6/9/08 3014 22F WARNER AVE MAGNOLIA ST ROSS ST B ~ 1,448 42 63,816 1/26/24 65 30 68 2 New Construction - Initial 1/1/80 3014 22D WARNER AVE EUCLID ST NEWHOPE ST B ~ 2,595 42 123,124 1/26/24 67 56 44 0 New Construction - Initial 1/1/80 3012 16D TALBERT AVE WARD ST EUCLID ST B ~ 2,610 32 93,009 2/16/24 67 54 29 17 New Construction - Initial 1/1/80 3012 17A TALBERT AVE EUCLID ST SANTA ANA RIVER B ~ 1,870 64 158,831 2/16/24 67 55 44 1 New Construction - Initial 1/1/80 3002 26B EDINGER AVE NEWHOPE ST HARBOR BLVD A ~ 3,150 64 193,600 3/6/24 67 63 33 4 New Construction - Initial 1/1/80 3004 38D EUCLID ST SOUTH PARK AVE TALBERT AVE C ~ 891 32 36,765 3/6/24 67 41 59 0 New Construction - Initial 1/1/80 3002 27D EDINGER AVE EUCLID ST NEWHOPE ST A ~ 2,580 22 60,760 3/6/24 68 41 58 1 New Construction - Initial 1/1/80 3013 7B WARD ST TALBERT AVE SLATER AVE C ~ 2,665 60 153,222 3/6/24 68 51 43 6 New Construction - Initial 1/1/80 3009 11E NEWHOPE ST TALBERT AVE EUCLID ST C ~ 950 25 31,640 2/16/24 69 31 63 6 New Construction - Initial 1/1/00 3001 4F BUSHARD ST EDINGER AVE N CITY LIMITS C ~ 790 60 47,090 3/6/24 69 55 38 7 New Construction - Initial 1/1/80 3012 16C TALBERT AVE BUSHARD ST BROOKHURST ST B ~ 2,585 32 96,685 5/14/24 69 69 31 0 Overlay - AC Structural 6/9/08 3011 20A SLATER AVE BROOKHURST ST WARD ST C ~ 2,585 30 83,603 2/17/24 69 46 47 7 New Construction - Initial 1/1/80 3014 24B WARNER AVE NEWHOPE ST EUCLID ST B ~ 2,595 42 119,212 1/26/24 70 55 31 14 New Construction - Initial 1/1/80 3010 32A NEWLAND ST 1645' N OF GARFIELD AVE ELLIS AVE A ~ 998 32 31,936 2/28/24 70 64 5 31 New Construction - Initial 1/1/80 3002 28B EDINGER AVE 165' E OF EUCLID ST EUCLID ST A ~ 165 32 7,380 3/6/24 70 42 58 0 New Construction - Initial 1/1/80 3013 7E WARD ST ELLIS AVE I-405 C ~ 1,985 60 105,044 3/6/24 72 15 85 0 New Construction - Initial 1/1/80 3012 16A TALBERT AVE NEWLAND ST SANTA MARIANA ST B ~ 1,123 32 39,235 2/16/24 72 49 51 0 Overlay - AC Structural 1/1/08 3004 38B EUCLID ST TALBERT AVE SOUTH PARK AVE C ~ 891 45 38,871 3/6/24 72 93 0 7 New Construction - Initial 1/1/80 3001 34B BUSHARD ST ELLIS AVE TOUCAN AVE C ~ 1,175 60 68,663 2/28/24 72 51 41 8 New Construction - Initial 1/1/80 3012 18A TALBERT AVE EUCLID ST WARD ST B ~ 2,610 32 94,972 2/16/24 73 72 28 0 New Construction - Initial 1/1/80 3010 1A NEWLAND ST GARFIELD AVE 1645' N OF GARFIELD AVE C ~ 1,645 12 19,740 2/28/24 73 100 0 0 New Construction - Initial 1/1/80 3004 8B EUCLID ST SOUTH PARK AVE SLATER AVE C ~ 1,754 45 84,805 3/6/24 74 88 11 1 New Construction - Initial 1/1/80 3000 6A BROOKHURST ST N CITY LIMITS EDINGER AVE B ~ 782 42 42,354 3/6/24 74 54 44 2 New Construction - Initial 1/1/80 3010 32D NEWLAND ST REMBRANDT DR WARNER AVE C ~ 719 12 8,628 3/6/24 74 23 44 33 New Construction - Initial 1/1/80 3009 11D NEWHOPE ST HEIL AVE EDINGER AVE C ~ 2,578 60 153,250 3/6/24 75 92 8 0 New Construction - Initial 1/1/80 3013 37A WARD ST FALCON AVE ELLIS AVE C ~ 1,315 60 79,418 3/6/24 75 100 0 0 New Construction - Initial 1/1/80 3009 11C NEWHOPE ST WARNER AVE HEIL AVE C ~ 2,660 60 153,855 3/6/24 75 82 13 5 New Construction - Initial 1/1/80 3000 6E BROOKHURST ST TALBERT AVE QUAIL AVE B ~ 1,770 42 73,547 2/15/24 75 48 38 14 Overlay - AC Structural 6/9/08 3014 24A WARNER AVE SANTA ANA RIVER NEWHOPE ST B ~ 2,085 42 91,199 1/26/24 76 72 28 0 New Construction - Initial 1/1/80 3005 29B GARFIELD AVE BROOKHURST ST BUSHARD ST A ~ 2,570 12 28,340 3/6/24 76 74 10 16 ARHM 6/2/04 3001 4D BUSHARD ST WARNER AVE HEIL AVE C ~ 2,655 60 154,810 2/28/24 77 30 67 3 New Construction - Initial 1/1/80 3008 3C MAGNOLIA ST TALBERT AVE SB ELLIS AVE A ~ 2,680 32 91,064 2/17/24 77 43 57 0 New Construction - Initial 1/1/80 3014 22E WARNER AVE NEWHOPE ST SANTA ANA RIVER B ~ 2,085 42 90,101 1/26/24 77 89 11 0 New Construction - Initial 1/1/80 3012 30B TALBERT AVE SANTA MARIANA ST MAGNOLIA ST A ~ 1,472 32 48,742 2/16/24 78 75 25 0 New Construction - Initial 1/1/80 3011 19E SLATER AVE NEWHOPE ST SANTA ANA RIVER C ~ 685 60 44,685 2/17/24 78 100 0 0 New Construction - Initial 1/1/80 3011 19G SLATER AVE I-405 BROOKHURST ST C ~ 1,070 60 68,673 2/16/24 78 43 56 1 New Construction - Initial 1/1/80 3013 7A WARD ST GARFIELD AVE FALCON AVE C ~ 1,362 60 76,021 3/6/24 78 80 0 20 New Construction - Initial 1/1/80 3009 11F NEWHOPE ST EUCLID ST TALBERT AVE C ~ 960 25 32,593 2/16/24 79 73 27 0 New Construction - Initial 1/1/00 3002 28A EDINGER AVE E CITY LIMITS HARBOR BLVD A ~ 1,202 42 50,484 3/6/24 79 90 10 0 New Construction - Initial 1/1/80 3000 35B BROOKHURST ST ELLIS AVE QUAIL AVE B ~ 983 42 45,675 2/15/24 79 65 10 25 New Construction - Initial 1/1/80 3000 36E BROOKHURST ST QUAIL AVE ELLIS AVE B ~ 985 42 46,176 2/15/24 79 62 35 3 New Construction - Initial 1/1/80 3012 16B TALBERT AVE MAGNOLIA ST BUSHARD ST B ~ 2,600 32 94,220 2/16/24 79 80 18 2 New Construction - Initial 1/1/80 3004 8C EUCLID ST TALBERT AVE I-405 C ~ 3,211 32 111,698 2/16/24 79 39 60 1 New Construction - Initial 1/1/80 3001 4C BUSHARD ST TALBERT AVE EL CAMINO AVE C ~ 1,385 60 81,247 2/28/24 80 57 43 0 New Construction - Initial 1/1/80

Page 1 of 20 ends
Page 89 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 3011 21A SLATER AVE WARD ST BROOKHURST ST C ~ 2,585 35 97,553 2/17/24 80 56 39 5 New Construction - Initial 1/1/80 3011 19D SLATER AVE EUCLID ST NEWHOPE ST C ~ 2,600 60 176,660 2/17/24 80 95 3 2 New Construction - Initial 1/1/80 3011 19C SLATER AVE WARD ST EUCLID ST C ~ 2,650 60 161,174 2/17/24 80 46 50 4 New Construction - Initial 1/1/80 3000 5D BROOKHURST ST WARNER AVE NB HEIL AVE B ~ 2,645 42 128,191 1/25/24 81 100 0 0 Overlay - AC Structural 1/1/08 3012 18C TALBERT AVE BUSHARD ST MAGNOLIA ST B ~ 2,600 32 95,700 2/15/24 81 64 29 7 New Construction - Initial 1/1/80 3005 29A GARFIELD AVE SAN CARLOS ST BROOKHURST ST A ~ 1,782 12 21,384 3/6/24 81 88 10 2 ARHM 6/2/04 3005 29D GARFIELD AVE MAGNOLIA ST NEWLAND ST A ~ 2,600 12 31,200 2/28/24 81 41 56 3 ARHM 6/2/04 3003 15A ELLIS AVE NEWLAND ST MAGNOLIA ST C ~ 2,600 60 155,826 2/28/24 81 49 43 8 New Construction - Initial 1/1/80 3011 19B SLATER AVE MAGNOLIA ST BUSHARD ST C ~ 2,605 60 153,992 2/16/24 81 74 26 0 New Construction - Initial 1/1/80 3012 18D TALBERT AVE SANTA MARIANA ST NEWLAND ST B ~ 1,123 32 39,204 2/15/24 81 69 31 0 Overlay - AC Structural 1/1/08 3013 7C WARD ST SLATER AVE WARNER AVE C ~ 2,675 60 152,774 3/6/24 81 86 3 11 New Construction - Initial 1/1/80 3000 5B BROOKHURST ST QUAIL AVE TALBERT AVE B ~ 1,830 42 88,487 2/15/24 81 70 4 26 Overlay - AC Structural 6/9/08 3008 2B MAGNOLIA ST ELLIS AVE TALBERT AVE A ~ 2,680 32 93,949 2/17/24 82 58 21 21 New Construction - Initial 1/1/80 3003 15C ELLIS AVE BROOKHURST ST WARD ST C ~ 2,600 60 156,640 2/28/24 82 42 56 2 Overlay - AC Structural 6/9/08 3012 30A TALBERT AVE MAGNOLIA ST SANTA MARIANA ST B ~ 1,472 32 51,865 2/15/24 82 100 0 0 New Construction - Initial 1/1/80 3008 3A MAGNOLIA ST WARNER AVE SB SLATER AVE A ~ 2,685 32 90,336 2/17/24 82 51 48 1 ARHM 9/10/13 3001 4A BUSHARD ST ROBIN AVE ELLIS AVE C ~ 1,202 60 69,209 2/28/24 83 55 45 0 New Construction - Initial 1/1/80 3010 1D NEWLAND ST SLATER AVE REMBRANDT DR C ~ 1,997 12 23,964 3/6/24 83 54 33 13 New Construction - Initial 1/1/80 3003 15F ELLIS AVE CVF CONTROL CHANNEL BUSHARD ST C ~ 1,285 60 76,486 2/28/24 83 64 0 36 New Construction - Initial 1/1/80 3001 34C BUSHARD ST EL CAMINO AVE SLATER AVE C ~ 1,205 60 69,884 2/28/24 83 59 35 6 New Construction - Initial 1/1/80 3003 15E ELLIS AVE MAGNOLIA ST CVF CONTROL CHANNEL C ~ 1,300 60 78,076 2/28/24 84 62 34 4 New Construction - Initial 1/1/80 3005 29E GARFIELD AVE WARD ST SAN CARLOS ST A ~ 808 12 9,696 3/6/24 84 100 0 0 New Construction - Initial 1/1/80 3000 5A BROOKHURST ST CITY LIMIT ELLIS AVE B ~ 2,660 42 121,696 2/15/24 84 69 6 25 Overlay - AC Structural 6/9/08 3000 5F BROOKHURST ST EDINGER AVE N CITY LIMITS B ~ 600 42 28,219 3/6/24 84 91 0 9 New Construction - Initial 1/1/80 3011 19A SLATER AVE NEWLAND ST MAGNOLIA ST C ~ 2,602 60 154,566 2/16/24 85 69 13 18 ARHM 9/10/13 3001 4H BUSHARD ST I-405 WARNER AVE C ~ 1,036 60 62,144 2/28/24 85 35 65 0 New Construction - Initial 1/1/80 3004 8A EUCLID ST I-405 TALBERT AVE C ~ 3,240 32 119,685 2/16/24 85 51 37 12 New Construction - Initial 1/1/80 3001 34A BUSHARD ST GARFIELD AVE ROBIN AVE C ~ 1,470 60 84,942 2/28/24 85 85 15 0 New Construction - Initial 1/1/80 3001 4E BUSHARD ST HEIL AVE EDINGER AVE C ~ 2,600 60 150,154 2/28/24 85 32 60 8 New Construction - Initial 1/1/80 3000 6F BROOKHURST ST ELLIS AVE CITY LIMIT B ~ 2,660 42 120,275 2/15/24 85 68 4 28 Overlay - AC Structural 6/9/08 3011 19F SLATER AVE BUSHARD ST I-405 C ~ 1,180 60 66,420 2/16/24 85 100 0 0 New Construction - Initial 1/1/80 3007 25A HEIL AVE MAGNOLIA ST BUSHARD ST C ~ 2,595 60 154,281 1/25/24 86 100 0 0 New Construction - Initial 1/1/80 3004 10F EUCLID ST CITY LIMIT EDINGER AVE A ~ 345 32 16,362 1/25/24 86 43 57 0 New Construction - Initial 1/1/80 3004 10E EUCLID ST EDINGER AVE CITY LIMIT A ~ 345 32 11,881 1/25/24 87 67 33 0 New Construction - Initial 1/1/80 3002 27A EDINGER AVE BUSHARD ST BROOKHURST ST A ~ 2,590 32 90,919 1/25/24 87 98 0 2 New Construction - Initial 1/1/80 3000 6C BROOKHURST ST HEIL AVE WARNER AVE B ~ 2,645 42 116,657 1/25/24 87 88 5 7 Overlay - AC Structural 1/1/08 3008 3B MAGNOLIA ST SLATER AVE SB TALBERT AVE A ~ 2,655 32 95,035 2/17/24 88 84 0 16 ARHM 9/10/13 3007 25B HEIL AVE BUSHARD ST BROOKHURST ST C ~ 2,595 60 153,323 1/25/24 88 100 0 0 New Construction - Initial 1/1/80 3008 2C MAGNOLIA ST TALBERT AVE NB SLATER AVE A ~ 2,655 32 93,475 2/17/24 88 54 24 22 ARHM 9/10/13 3001 4B BUSHARD ST TOUCAN AVE TALBERT AVE C ~ 1,620 60 92,933 2/28/24 88 100 0 0 New Construction - Initial 1/1/80 3001 4G BUSHARD ST SLATER AVE I-405 C ~ 1,230 60 73,905 2/28/24 88 56 44 0 New Construction - Initial 1/1/80 3000 6B BROOKHURST ST EDINGER AVE HEIL AVE B ~ 2,560 42 107,850 1/25/24 89 59 0 41 New Construction - Initial 1/1/80 3008 2A MAGNOLIA ST GARFIELD AVE ELLIS AVE A ~ 2,677 32 98,067 2/17/24 89 62 35 3 New Construction - Initial 1/1/80 3008 3D MAGNOLIA ST ELLIS AVE GARFIELD AVE A ~ 2,687 32 90,678 2/17/24 90 71 29 0 ARHM 6/2/04 3002 28E EDINGER AVE BROOKHURST ST BUSHARD ST A ~ 2,590 32 92,594 1/25/24 90 100 0 0 New Construction - Initial 1/1/80 3000 5E BROOKHURST ST HEIL AVE EDINGER AVE B ~ 2,560 42 122,487 1/25/24 90 56 0 44 New Construction - Initial 1/1/80 3003 15D ELLIS AVE WARD ST I-405 C ~ 2,550 60 157,142 2/17/24 90 59 17 24 Overlay - AC Structural 6/9/08 3000 36D BROOKHURST ST WARNER AVE SB LA ALAMEDA AVE B ~ 1,325 42 58,080 2/15/24 90 100 0 0 ARHM 12/13/13 3008 2D MAGNOLIA ST SLATER AVE NB WARNER AVE A ~ 2,685 32 94,518 2/17/24 91 57 43 0 ARHM 9/10/13 3000 6D BROOKHURST ST LA ALAMEDA AVE SB SLATER AVE B ~ 1,350 42 63,478 2/15/24 94 68 32 0 ARHM 12/13/13 3005 29C GARFIELD AVE BUSHARD ST MAGNOLIA ST A ~ 2,600 12 31,200 2/28/24 94 94 0 6 ARHM 6/2/04 3000 35C BROOKHURST ST LA ALAMEDA AVE NB WARNER AVE B ~ 1,325 42 63,978 2/15/24 94 100 0 0 ARHM 12/13/13 3000 5C BROOKHURST ST SLATER AVE NB LA ALAMEDA AVE B ~ 1,350 42 60,327 2/15/24 94 100 0 0 ARHM 12/13/13 3006 14B HARBOR BL LILAC AVE EDINGER AVE B ~ 1,348 42 59,482 1/26/24 94 100 0 0 New Construction - Initial 1/1/80 3004 10D EUCLID ST HOSPITAL/CAMPUS SLATER AVE C ~ 1,707 32 64,548 1/25/24 95 12 81 7 Overlay - AC Structural 6/1/18 3006 13B HARBOR BL EDINGER AVE LILAC AVE B ~ 1,348 42 56,214 1/26/24 95 100 0 0 New Construction - Initial 1/1/80

Page 2 of 20 ends
Page 90 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 3006 14A HARBOR BL N CITY LIMITS LILAC AVE B ~ 660 42 29,818 1/26/24 95 100 0 0 New Construction - Initial 1/1/80 3004 9C EUCLID ST HEIL AVE EDINGER AVE C ~ 2,710 32 89,174 1/25/24 95 7 0 93 Overlay - AC Structural 12/1/21 3006 13C HARBOR BL LILAC AVE N CITY LIMITS B ~ 660 42 29,739 1/26/24 97 100 0 0 New Construction - Initial 1/1/80 3002 27B EDINGER AVE BROOKHURST ST WARD ST A ~ 2,575 32 88,055 2/5/24 97 63 0 37 New Construction - Initial 1/1/80 3002 27C EDINGER AVE WARD ST EUCLID ST A ~ 2,595 32 89,054 2/5/24 97 60 0 40 New Construction - Initial 1/1/80 3004 40D EUCLID ST WARNER AVE HOSPITAL/CAMPUS C ~ 983 32 31,892 1/25/24 97 70 0 30 Overlay - AC Structural 6/1/18 3009 11A NEWHOPE ST TALBERT AVE SLATER AVE C ~ 3,742 60 232,110 1/26/24 98 100 0 0 Overlay - AC Structural 6/1/19 3002 28C EDINGER AVE EUCLID ST WARD ST A ~ 2,595 32 82,269 2/5/24 98 75 0 25 New Construction - Initial 1/1/80 3004 9A EUCLID ST SLATER AVE HOSPITAL/CAMPUS C ~ 1,707 32 51,280 1/25/24 98 97 0 3 Overlay - AC Structural 6/1/18 3002 28D EDINGER AVE WARD ST BROOKHURST ST A ~ 2,575 32 85,136 2/5/24 98 73 0 27 New Construction - Initial 1/1/80 3004 39A EUCLID ST HOSPITAL/CAMPUS WARNER AVE C ~ 983 32 42,223 1/25/24 98 100 0 0 Overlay - AC Structural 6/1/18 3006 14D HARBOR BL PENGUIN AVE CITY LIMIT B ~ 1,621 42 68,274 1/26/24 99 100 0 0 New Construction - Initial 6/11/12 3013 7D WARD ST EDINGER AVE N CITY LIMITS C ~ 710 60 37,701 2/5/24 99 100 0 0 Overlay - AC Structural 4/1/23 3009 11B NEWHOPE ST SLATER AVE WARNER AVE C ~ 2,690 60 155,923 1/26/24 99 100 0 0 Overlay - AC Structural 6/1/19 3006 13D HARBOR BL CITY LIMIT PENGUIN AVE B ~ 1,615 42 66,401 1/26/24 99 100 0 0 New Construction - Initial 6/11/12 3010 1B NEWLAND ST TRINITY RIVER CIR TALBERT AVE C ~ 1,807 12 21,684 2/15/24 99 100 0 0 Overlay - AC Structural 12/1/21 3010 32B NEWLAND ST ELLIS AVE TRINITY RIVER CIR C ~ 745 12 8,940 2/15/24 99 100 0 0 Overlay - AC Structural 12/1/21 3014 22C WARNER AVE BROOKHURST ST WARD ST B ~ 2,580 42 113,494 1/25/24 99 100 0 0 Overlay - AC Structural 6/1/20 3014 23D WARNER AVE EUCLID ST WARD ST B ~ 2,595 42 125,905 1/25/24 99 100 0 0 Overlay - AC Structural 8/1/20 3006 13A HARBOR BL 500' N/O HEIL AVE PENGUIN AVE B ~ 1,448 42 69,439 1/26/24 99 100 0 0 ARHM 9/21/04 3006 14C HARBOR BL PENGUIN AVE 500' N/O HEIL AVE B ~ 1,541 42 70,286 1/26/24 99 100 0 0 New Construction - Initial 1/1/80 3004 9B EUCLID ST WARNER AVE HEIL AVE C ~ 2,640 32 86,391 1/25/24 99 47 0 53 Overlay - AC Structural 12/1/21 3014 23A WARNER AVE WARD ST EUCLID ST B ~ 2,595 42 104,491 1/25/24 99 100 0 0 Overlay - AC Structural 6/1/20 3010 32C NEWLAND ST EL ARROYO AV SLATER AV C ~ 1,169 12 14,028 2/15/24 99 100 0 0 New Construction - Initial 1/1/80 3010 1C NEWLAND ST TALBERT AVE EL ARROYO AVE C ~ 1,481 12 17,772 2/15/24 99 100 0 0 New Construction - Initial 1/1/80 3013 7F WARD ST I-405 TALBERT AVE C ~ 575 60 21,227 2/5/24 99 100 0 0 New Construction - Initial 1/1/80 3014 24C WARNER AVE WARD ST BROOKHURST ST B ~ 2,580 42 123,173 1/25/24 100 100 0 0 Overlay - AC Structural 6/1/20 3008 2E MAGNOLIA ST WARNER AVE I-405 A ~ 1,271 32 41,422 3/6/24 100 0 0 0 ARHM 6/2/04 3008 2F MAGNOLIA ST I-405 HEIL AVE A ~ 940 32 30,080 3/6/24 100 0 0 0 ARHM 6/2/04 3000 5G BROOKHURST ST TALBERT AVE I-405 B ~ 1,015 42 44,777 2/15/24 100 0 0 0 New Construction - Initial 1/1/80 3000 6G BROOKHURST ST SLATER AVE SB I-405 B ~ 1,155 42 54,932 2/15/24 100 0 0 0 New Construction - Initial 1/1/80 3000 6H BROOKHURST ST I-405 TALBERT AVE B ~ 1,010 42 54,770 2/15/24 100 0 0 0 New Construction - Initial 1/1/80 3000 5H BROOKHURST ST I-405 SLATER AVE B ~ 1,210 42 55,440 2/15/24 100 0 0 0 New Construction - Initial 1/1/80 3012 17C TALBERT AVE BROOKHURST ST I-405 B ~ 1,240 64 62,100 2/16/24 100 0 0 0 New Construction - Initial 1/1/80 3012 17B TALBERT AVE I-405 WARD ST B ~ 940 64 30,657 2/16/24 100 0 0 0 New Construction - Initial 1/1/80 3014 23B WARNER AVE BUSHARD ST I-405 B ~ 930 42 40,205 1/26/24 100 0 0 0 New Construction - Initial 1/1/80 3014 33D WARNER AVE MAGNOLIA ST I-405 B ~ 1,275 42 59,673 1/26/24 100 0 0 0 New Construction - Initial 1/1/80 3014 23C WARNER AVE I-405 MAGNOLIA ST B ~ 1,225 42 65,334 1/26/24 100 0 0 0 New Construction - Initial 1/1/80 3014 33C WARNER AVE I-405 BUSHARD ST B ~ 930 42 46,043 1/26/24 100 0 0 0 New Construction - Initial 1/1/80 3007 25D HEIL AVE EUCLID ST NEWHOPE ST C ~ 2,565 60 121,390 1/26/24 100 0 0 0 Overlay - AC Structural 4/1/23 3007 25E HEIL AVE NEWHOPE ST HARBOR BLVD C ~ 2,590 60 154,899 1/26/24 100 0 0 0 Overlay - AC Structural 4/1/23 3004 10C EUCLID ST HEIL AVE WARNER AVE C ~ 2,640 32 104,034 1/25/24 100 0 0 0 Overlay - AC Structural 12/1/21 3004 10B EUCLID ST EDINGER AVE HEIL AVE C ~ 2,710 32 97,365 1/25/24 100 0 0 0 Overlay - AC Structural 12/1/21

54.2 12,318,391
Locals
919 10875 ALLEY E/O SAN MATEO ST PIKE AVE ALLEY N/O EL CORAZON AVE E E4 490 22 10,780 4/23/24 34 11 89 0 Overlay - AC Structural 6/22/12 920 10874 ALLEY E/O SAN LUIS ST SAN MATEO ST SAN LUIS ST E E4 1,420 22 32,240 4/23/24 37 6 89 5 Overlay - AC Structural 6/22/12 984 10941 CARLSBAD CT DELTA RIVER CT END E E6 188 22 4,136 3/7/23 43 13 87 0 Overlay - AC Structural 6/1/12 654 10601 ROSS ST EL RANCHO AVE WARNER AVE E B4 450 28 12,720 3/14/23 45 9 91 0 Overlay - AC Structural 1/1/07 918 10876 ALLEY N/O EL CORAZON AVE SAN MATEO ST SAN LUIS ST E E4 250 25 6,450 4/23/24 46 13 85 2 Overlay - AC Structural 6/22/12 939 10895 CRATER LAKE CT ADOBE RIVER AVE ELK RIVER CT E E6 244 22 5,368 3/7/23 49 12 88 0 Overlay - AC Structural 6/1/12 937 10893 CANYON CT END ADOBE RIVER AVE E E6 205 22 4,510 3/7/23 51 17 83 0 Overlay - AC Structural 6/1/12 938 10894 ELK RIVER CT ANTELOPE RIVER AVE CRATER LAKE CT E E6 924 21 19,404 4/25/24 54 50 45 5 Overlay - AC Structural 6/1/12 410 10372 LOS LEONES ST GARFIELD AVE ORIOLE AVE E E7 192 36 6,912 4/26/24 55 27 67 6 Surface Treatment - Slurry Seal 6/13/08 828 10764 TEAL CIR SAN ANTONIO ST EAST END E E7 463 32 16,072 4/26/24 57 29 71 0 Surface Treatment - Slurry Seal 6/13/08

Page 3 of 20 ends
Page 91 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 156 10133 EGRET AVE SAN ANTONIO ST WARD ST E E7 526 36 18,936 4/26/24 58 14 83 3 Surface Treatment - Slurry Seal 6/13/08 992 10949 BLACK RIVER CT SHENANDOAH ST MUIR WOODS CT E E6 232 22 5,104 3/7/23 61 23 77 0 Overlay - AC Structural 6/1/12 327 10294 LA CASITA AVE SANTA ISABEL ST SANTA RITA ST E B4 276 36 12,036 3/14/23 61 29 60 11 Surface Treatment - Slurry Seal 6/13/08 147 10126 DIDDY CIR CANARY AVE NORTH END E B7 172 32 7,024 4/1/22 62 91 9 0 Overlay - AC Structural 7/1/11 959 10912 MUIR WOODS CT END END E E6 241 21 5,061 3/7/23 63 12 69 19 Overlay - AC Structural 6/1/12 356 10322 LA PALOMA AVE SANTA MADRINA ST SANTA BARBARA ST E B4 591 36 24,776 3/8/23 64 24 76 0 Surface Treatment - Slurry Seal 6/13/08 705 10649 SANTA ADELA CIR SOUTH END RHINE RIVER AVE E B6 355 33 12,971 4/29/22 64 80 20 0 Overlay - AC Structural 7/1/11 751 10695 SANTA ROSALIA ST EL CAPITAN AVE SLATER AVE E B5 589 33 19,437 4/28/22 64 55 45 0 Overlay - AC Structural 7/1/11 993 10950 CLEAR RIVER CT SHENANDOAH ST END E E6 223 22 4,906 3/7/23 66 18 82 0 Overlay - AC Structural 6/1/12 481 10439 MT CHERIE CIR MOPAN RIVER AVE NORTH END E E6 501 33 17,789 3/7/23 66 28 50 22 Overlay - AC Structural 6/22/12 606 10560 PINE CIR DAISY AVE CDS E C3 524 36 20,339 5/14/24 66 81 19 0 Overlay - AC Structural 6/13/08 745 10689 SANTA MONICA CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 66 85 15 0 Overlay - AC Structural 7/1/11 195 10172 EL RANCHO AVE SANTA ISABEL ST SANTA MADRINA ST E B4 1,663 36 61,740 5/13/24 67 32 68 0 Surface Treatment - Slurry Seal 6/13/08 718 10662 SANTA CECILIA ST SOUTH END TALBERT AVE E B6 1,252 33 44,376 4/28/22 67 82 18 0 Overlay - AC Structural 7/1/11 964 10919 TRUCKEE RIVER CT FIRESTONE CT YELLOWSTONE CT E E6 565 22 12,430 3/7/23 67 28 72 0 Overlay - AC Structural 6/1/12 668 10615 SAN BLAS ST ORIOLE AVE SWALLOW AVE E E7 271 36 10,692 4/26/24 67 41 48 11 Surface Treatment - Slurry Seal 6/13/08 34 10028 BANDILIER CIR ELLIS AVE NORTH END E F6 446 36 17,312 4/26/24 67 39 28 33 Surface Treatment - Chip Seal 5/25/02 788 10728 SOUTHPARK AVE EUCLID ST NEWHOPE ST I G5 780 46 35,880 4/25/24 68 93 0 7 New Construction - Initial 1/1/80 505 10463 MT HERRMANN ST SLATER AVE NORTH END I G4 1,272 46 60,362 4/26/21 68 43 55 2 Overlay - AC Structural 8/1/09 565 10520 OLEANDER CIR DAISY AVE CDS E C3 497 36 18,867 3/6/23 68 29 45 26 Surface Treatment - Slurry Seal 6/13/08 697 10642 SAN RICARDO ST SOUTH END WARNER AVE E F4 1,261 36 42,751 3/22/23 68 44 40 16 Overlay - AC Structural 6/1/15 752 10696 SANTA SOPHIA CIR SOUTH END RHINE RIVER AVE E B6 455 33 16,271 4/29/22 68 90 0 10 Overlay - AC Structural 7/1/11 856 10791 VIRGINIA CIR PACIFIC ST EAST END I F6 348 36 13,784 4/22/21 68 39 25 36 Overlay - AC Structural 8/1/09 959 10942 MUIR WOODS CT ADOBE RIVER AVE DELTA RIVER CT E E6 246 22 4,412 4/25/24 68 15 77 8 Overlay - AC Structural 6/1/12 976 10932 CAPITOL REEF CT CORRAL RIVER CT COYOTE RIVER CT E E6 152 22 3,344 3/7/23 69 19 81 0 Overlay - AC Structural 6/1/12 955 10910 CORRAL RIVER CT BIG BEN CT CAPITAL REEF CT E E6 576 22 12,672 3/7/23 69 60 40 0 Overlay - AC Structural 6/1/12 586 10540 PARAKEET CIR SAN ANTONIO ST EAST END E E7 466 32 16,168 4/24/24 69 52 46 2 Surface Treatment - Slurry Seal 6/13/08 711 10655 SANTA BARBARA ST LA STELLA AVE LA PALOMA AVE E B4 1,030 36 40,580 5/14/24 69 38 62 0 Surface Treatment - Slurry Seal 6/13/08 722 10666 SANTA CRISTOBAL ST EL ARROYO AVE EL RIO AVE E B5 979 36 37,044 4/28/22 69 89 11 0 Overlay - AC Structural 7/1/11 737 10680 SANTA LUCIA ST SOUTH END EL RANCHO AVE E B4 320 36 12,776 3/14/23 69 27 73 0 Overlay - AC Structural 1/1/07 739 10683 SANTA MADRINA ST LA CASITA AVE EL RANCHO AVE E B4 732 36 30,552 3/14/23 69 45 55 0 Surface Treatment - Slurry Seal 6/13/08 872 10806 WAXWING CIR SAN ANTONIO ST EAST END E E7 471 32 16,328 4/26/24 69 42 39 19 Surface Treatment - Slurry Seal 6/13/08 119 10103 CONDOR AVE EUCLID ST MT. WASHINGTON AVE E G6 1,003 60 60,735 4/22/21 70 64 25 11 Overlay - AC Structural 8/1/09 181 10158 EL LIBRO AVE SANTA ISABEL ST SANTA MARIA ST E B4 320 36 13,620 3/14/23 70 23 77 0 Surface Treatment - Slurry Seal 6/13/08 598 10552 PEREGRINE CIR LOS CANARIOS ST EAST END E E6 397 33 14,357 3/7/23 70 36 64 0 Overlay - AC Structural 6/1/12 639 10588 REMBRANDT DR NEWLAND ST SANTA ISABEL ST E B4 189 36 6,804 3/14/23 70 38 62 0 Surface Treatment - Slurry Seal 6/13/08 642 10591 RHOADS CIR NEWLAND ST EAST END E B6 522 36 21,852 4/25/22 70 77 23 0 Overlay - AC Structural 7/1/11 410 10374 LOS LEONES ST ROBIN AVE PHEASANT AVE E E7 908 36 32,688 4/26/24 70 27 48 25 Surface Treatment - Slurry Seal 6/13/08 7009 10837 BUNTING CIR MT. WATERMAN ST EAST END E E6 376 33 13,664 4/25/24 71 35 53 12 Overlay - AC Structural 6/1/12 162 10139 EL CAMINO AVE OAK ST BUSHARD ST E C5 1,161 36 41,796 4/28/22 71 40 60 0 Overlay - AC Structural 6/1/10 243 10214 FRAZER RIVER CIR WEST END SANTA ARABELLA ST E B6 444 33 17,712 4/6/22 71 94 6 0 Overlay - AC Structural 7/1/11 298 10266 JANACA CIR LOS CANARIOS ST EAST END E E6 400 33 14,456 3/7/23 71 27 50 23 Overlay - AC Structural 6/1/12 383 10349 LAWSON RIVER AVE WARD ST MT. LANGLEY ST I F6 1,047 45 47,115 4/22/21 71 76 23 1 Overlay - AC Structural 8/1/09 438 10398 MARTENS RIVER CIR NEWHOPE ST EAST END I H4 720 36 27,395 4/26/21 71 38 0 62 Overlay - AC Structural 8/1/09 741 10685 SANTA MARIA ST SLATER AVE LA BAYA AVE E B4 1,131 36 39,852 5/14/24 71 74 16 10 Surface Treatment - Slurry Seal 6/13/08 747 10691 SANTA PAULA CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 71 80 20 0 Overlay - AC Structural 7/1/11 749 10693 SANTA RITA ST LA CASITA AVE EL RANCHO AVE E B4 751 36 29,136 5/14/24 71 37 63 0 Surface Treatment - Slurry Seal 6/13/08 755 10699 SANTA TERESA CIR EL PRESIDENTE AVE NORTH END E B5 310 33 13,290 4/28/22 71 59 39 2 Overlay - AC Structural 7/1/11 760 10704 SANTA YOLANDA CIR THAMES RIVER AVE NORTH END E B6 448 33 17,844 4/25/22 71 89 11 0 Overlay - AC Structural 7/1/11 983 10940 DELTA RIVER CT MUIR WOODS CT CARLSBAD CT E E6 224 22 4,928 3/7/23 72 16 84 0 Overlay - AC Structural 6/1/12 150 10129 DOLPHIN AVE SLATER AVE FREMONT ST E D5 805 28 22,540 4/21/21 72 73 20 7 New Construction - Initial 1/1/80 959 10914 MUIR WOODS CT END END E E6 190 21 3,990 3/7/23 72 38 62 0 Overlay - AC Structural 6/1/12 566 10521 OLIVE CIR ROSE AVE NORTH END E C3 382 36 15,227 3/6/23 72 34 64 2 Surface Treatment - Slurry Seal 6/13/08 567 10522 OLIVE ST DAISY AVE ROSE AVE E C3 616 36 24,056 5/14/24 72 40 50 10 Surface Treatment - Slurry Seal 6/13/08 604 10558 PHOENIX AVE NEWLAND ST SANTA ISADORA ST E B6 530 33 19,290 4/1/22 72 92 8 0 Overlay - AC Structural 7/1/11 641 10590 RHINE RIVER AVE SANTA CECILA CIR MAGNOLIA ST E B6 973 36 35,028 4/29/22 72 89 11 0 Overlay - AC Structural 7/1/11

Page 4 of 20 ends
Page 92 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 649 10596 ROGUE RIVER AVE SANTA LAURETTA CIR SANTA ARABELLA ST E B6 1,149 36 41,364 4/6/22 72 80 20 0 Overlay - AC Structural 7/1/11 753 10697 SANTA STEPHANA CIR SOUTH END MACKENZIE RIVER AVE E B6 501 33 19,593 4/25/22 72 85 15 0 Overlay - AC Structural 7/1/11 768 10712 SHANNON RIVER CIR WEST END SANTA ARABELLA ST E B6 504 33 19,692 4/6/22 72 93 7 0 Overlay - AC Structural 7/1/11 54 10046 BOATBILL CIR WEST END DAKOTA ST E B7 150 33 6,470 4/6/22 73 32 68 0 Overlay - AC Structural 7/1/11 130 10111 CRANE CIR SAN ANTONIO ST EAST END E E7 466 36 18,032 4/26/24 73 53 47 0 Surface Treatment - Slurry Seal 6/13/08 989 10946 ECHO RIVER CT ANTELOPE RIVER AVE END E E6 246 22 5,412 3/7/23 73 18 82 0 Overlay - AC Structural 6/1/12 159 10136 EL ARROYO AVE NEWLAND ST SANTA MARIA ST E B5 509 36 18,324 4/28/22 73 81 19 0 Overlay - AC Structural 7/1/11 161 10138 EL BLANCO AVE LOCUST ST CHESTNUT ST E C5 685 36 28,260 4/22/22 73 79 21 0 Overlay - AC Structural 6/1/10 193 10170 EL PRESIDENTE AVE SANTA ELISE ST MAGNOLIA ST E B5 1,039 36 39,204 4/28/22 73 81 19 0 Overlay - AC Structural 7/1/11 991 10948 KINGS RIVER CT MUIR WOODS CT SHENANDOAH ST E E6 250 22 5,500 3/7/23 73 22 78 0 Overlay - AC Structural 6/1/12 575 10529 OSTRICH CIR WEST END SANTA ISADORA ST E B6 418 33 16,854 4/1/22 73 100 0 0 Overlay - AC Structural 7/1/11 715 10659 SANTA CATALINA CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 73 78 20 2 Overlay - AC Structural 7/1/11 724 10668 SANTA DOMINGO CIR EL CAPITAN AVE NORTH END E B5 421 33 16,953 4/28/22 73 79 21 0 Overlay - AC Structural 7/1/11 735 10679 SANTA LEONORA CIR ELLIS AVE NORTH END E B6 555 33 21,375 4/25/22 73 78 22 0 Overlay - AC Structural 7/1/11 741 10684 SANTA MARIA ST EL ARROYO AVE SLATER AVE E B5 1,169 36 42,084 4/28/22 73 82 18 0 Overlay - AC Structural 7/1/11 164 10141 EL CAPITAN AVE SANTA PAULA ST SANTA ELENA CIR E B5 1,436 36 51,696 4/28/22 74 84 16 0 Overlay - AC Structural 7/1/11 265 10235 GRIPPO RIVER AVE MT. SCHELIN CR CORDATA ST E C7 502 36 18,072 4/21/22 74 93 7 0 Surface Treatment - Slurry Seal 7/1/23 288 10257 HUDSON RIVER CIR WEST END SANTA ARABELLA ST E B6 446 33 17,778 4/6/22 74 93 7 0 Overlay - AC Structural 7/1/11 312 10278 KLAMATH RIVER CIR STANISLAUS ST EAST END E E6 623 33 21,815 3/7/23 74 40 58 2 Overlay - AC Structural 6/1/12 365 10331 LA SOMBRA AVE SAN CLEMENTE ST WARD ST E E5 851 36 30,636 3/2/23 74 57 34 9 Surface Treatment - Slurry Seal 7/1/23 712 10656 SANTA BELINDA CIR THAMES RIVER AVE NORTH END E B6 1,030 33 38,850 4/25/22 74 88 9 3 Overlay - AC Structural 7/1/11 733 10677 SANTA JOANANA CIR SOUTH END RHINE RIVER AVE E B6 1,061 33 38,073 4/25/22 74 84 16 0 Overlay - AC Structural 7/1/11 754 10698 SANTA SUZANNE ST LA COLONIA AVE EL RANCHO AVE E B4 2,016 36 74,376 5/13/24 74 47 53 0 Overlay - AC Structural 1/1/07 47 10040 BITTEROOT CIR HICKORY ST WEST END E C2 167 33 6,986 4/22/24 74 34 0 66 Surface Treatment - Slurry Seal 5/25/01 136 10116 DAISY AVE MAZA CIR OLIVE CIR E C3 3,270 36 121,480 5/14/24 74 67 30 3 Surface Treatment - Slurry Seal 6/13/08 115 10099 COLEY RIVER CIR NEWHOPE ST EAST END E H4 922 36 34,667 4/29/22 75 59 31 10 Overlay - AC Structural 8/1/09 240 10211 FLYINGFISH CIR WARD ST EAST END E F4 302 36 12,347 3/22/23 75 33 59 8 Overlay - AC Structural 6/1/15 314 10281 LA ALAMEDA AVE FLAME TREE CR BROOKHURST ST E D4 775 36 27,900 4/21/21 75 38 8 54 Overlay - AC Structural 8/1/09 322 10289 LA BATISTA AVE LOS SANTOS ST LOS JARDINES EAST E F4 950 36 36,080 3/22/23 75 71 29 0 Overlay - AC Structural 6/1/15 362 10328 LA ROCA AVE SANTA MARIANA ST MAGNOLIA ST E B5 1,472 36 55,142 4/28/22 75 83 17 0 Overlay - AC Structural 7/1/11 539 10497 MT WASHINGTON ST CONDOR AVE TALBERT AVE I G6 868 60 52,455 4/22/21 75 81 11 8 Overlay - AC Structural 8/1/09 583 10536 PALM ST SWALLOW AVE HERON AVE E C7 1,819 36 67,356 4/6/22 75 85 15 0 Surface Treatment - Chip Seal 5/31/03 627 10577 RAINBOW CIR LOS ALAMOS ST EAST END E E5 815 36 30,815 3/2/23 75 65 0 35 Surface Treatment - Slurry Seal 7/1/23 631 10581 RECREATION CIR MAGNOLIA ST EAST END E C3 673 36 25,703 3/14/23 75 29 46 25 Overlay - AC Structural 5/1/08 946 10901 ROCKFISH CIR END NEWLAND ST E B5 626 36 26,136 4/28/22 75 86 14 0 Overlay - AC Structural 7/1/11 667 10614 SAN BERNARDO CIR EL MONTEREY AVE NORTH END E E5 373 33 13,784 3/2/23 75 34 32 34 Surface Treatment - Slurry Seal 7/1/23 674 10621 SAN DIEGO CIR EL MONTEREY AVE NORTH END E E5 373 33 13,784 3/2/23 75 34 21 45 Surface Treatment - Slurry Seal 7/1/23 750 10694 SANTA ROSA CIR EL PRESIDENTE AVE NORTH END E B5 310 33 13,290 4/28/22 75 71 29 0 Overlay - AC Structural 7/1/11 832 10768 TETON CIR SOUTH END EAGLE AVE E E7 404 36 15,800 4/24/24 75 78 8 14 Overlay - AC Structural 6/13/08 145 10124 DEVONWOOD CIR HELM AVE NORTH END E C6 620 36 23,337 4/22/22 76 72 28 0 Surface Treatment - Slurry Seal 7/1/23 153 10131 EAGLE AVE TETON CIR SAN FELIPE ST E E7 279 36 10,980 4/24/24 76 62 28 10 Overlay - AC Structural 6/13/08 180 10157 EL LAGO AVE SANTA MARIA ST SANTA ELISE ST E B5 1,094 36 41,184 4/28/22 76 82 18 0 Overlay - AC Structural 7/1/11 198 10174 EL RIO AVE SANTA CRISTOBAL ST SANTA MARIA ST E B5 300 36 12,600 4/28/22 76 76 24 0 Overlay - AC Structural 7/1/11 436 10396 MARIPOSA AVE BUSHARD ST BRIDGEPORT ST E D3 1,970 36 70,920 4/22/21 76 84 15 1 Surface Treatment - Slurry Seal 9/1/22 532 10490 MT SHAY ST TALBERT AVE KALAMA RIVER RD I F6 564 36 20,304 4/22/21 76 70 7 23 Overlay - AC Structural 8/1/09 723 10667 SANTA CRUZ CIR HUMMINGBIRD AVE NORTH END E B7 462 33 16,766 4/25/22 76 82 18 0 Overlay - AC Structural 7/1/11 847 10783 TRINITY RIVER CIR NEWLAND ST EAST END E B6 591 33 22,563 4/6/22 76 86 14 0 Overlay - AC Structural 7/1/11 860 10797 WALNUT ST ORIOLE AVE COCKATOO AVE E C7 1,028 36 38,880 4/22/22 76 100 0 0 New Construction - Initial 1/1/80 876 10809 WHITEFISH CIR NEWLAND ST EAST END E B5 626 33 23,718 4/28/22 76 76 24 0 Overlay - AC Structural 7/1/11 563 10518 OAK ST SLATER AVE LA COLONIA AVE E C4 173 36 6,228 4/23/24 76 60 40 0 Surface Treatment - Slurry Seal 5/31/01 643 10592 RICHARDSON ST EDINGER AVE LILAC AVE E H2 238 40 9,520 4/23/24 76 34 13 53 Overlay - AC Structural 8/31/18 82 10070 CAMELLIA AVE EUCLID ST MT. WHITNEY ST E G3 660 36 24,260 4/22/24 76 100 0 0 Overlay - AC Structural 6/1/16 581 10535 PACIFIC ST ELLIS AVE SPENCER AVE I F6 885 46 40,710 4/25/24 77 49 20 31 Overlay - AC Structural 8/1/09 12 10011 ANSON RIVER CIR SECOND ST EAST END E C6 450 32 15,656 4/25/22 77 79 21 0 Surface Treatment - Slurry Seal 7/1/23 191 10168 EL PICADOR CIR LOS JARDINES WEST EAST END E F4 319 36 14,952 3/22/23 77 41 0 59 Overlay - AC Structural 6/1/15 272 10242 HAYS RIVER CIR SECOND ST EAST END E C6 453 32 15,752 4/25/22 77 85 15 0 Surface Treatment - Slurry Seal 7/1/23

Page 5 of 20 ends
Page 93 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 316 10282 LA ALONDRA AVE LOS JARDINES WEST LOS ARCOS ST E F5 531 36 20,996 3/2/23 77 64 36 0 Overlay - AC Structural 6/1/15 335 10301 LA DESPENSA AVE LOS ALAMOS ST SAN FIDEL ST E E5 910 36 36,520 3/2/23 77 79 0 21 Surface Treatment - Slurry Seal 7/1/23 342 10308 LA FONDA CIR WEST END LOS JARDINES EAST E F4 502 36 19,547 3/22/23 77 60 24 16 Overlay - AC Structural 6/1/15 448 10408 MC GEE RIVER CIR MT. CITADEL ST EAST END E G3 335 33 12,530 4/25/24 77 57 0 43 Overlay - AC Structural 6/1/16 459 10417 MOCKINGBIRD CIR WEST END SANTA CLAUDIA ST E B6 252 33 13,176 4/29/22 77 66 34 0 Overlay - AC Structural 7/1/11 461 10419 MOLT RIVER CIR SECOND ST EAST END E C6 452 32 15,720 4/25/22 77 86 14 0 Surface Treatment - Slurry Seal 7/1/23 492 10450 MT DEMETER CIR GARFIELD AVE NORTH END E B7 485 33 17,525 4/6/22 77 100 0 0 Overlay - AC Structural 7/1/11 531 10489 MT SCHELIN CIR SOUTH END NORTH END E C7 627 32 22,944 4/21/22 77 90 9 1 Surface Treatment - Slurry Seal 7/1/23 999 10956 OTTAWA RIVER AVE SANTA ARABELLA ST SANTA CECILIA ST E B6 252 36 9,072 4/29/22 77 86 14 0 Overlay - AC Structural 7/1/11 612 10565 POINSETTIA AVE DAISY AVE AVOCADO ST E C3 834 36 30,024 3/6/23 77 31 34 35 Surface Treatment - Slurry Seal 6/13/08 701 10646 SANDPIPER CIR WEST END SANTA CLAUDIA ST E B6 268 33 11,904 4/29/22 77 84 16 0 Overlay - AC Structural 7/1/11 774 10718 SHRINER CIR WINEMAST ST WEST END E D4 411 36 18,151 4/21/21 77 92 0 8 Surface Treatment - Slurry Seal 5/31/01 776 10720 SIGMOND CIR SOUTH END RHOADS CIR E B6 298 33 14,694 4/25/22 77 87 13 0 Overlay - AC Structural 7/1/11 857 10792 VOLGA RIVER CIR SANTA LAURETTA CIR EAST END E B6 420 33 16,920 4/25/22 77 84 16 0 Overlay - AC Structural 7/1/11 859 10794 WAGNER RIVER CIR MT. KRISTINA ST EAST END E C6 621 32 21,128 4/25/22 77 80 20 0 Surface Treatment - Slurry Seal 7/1/23 39 10033 BECHLER RIVER AVE WARD ST AMISTAD ST E F6 517 36 19,548 4/25/24 77 79 21 0 Surface Treatment - Chip Seal 5/25/02 573 10526 ORIOLE AVE SAN FELIPE ST SAN CARLOS ST E E7 1,033 36 38,124 4/24/24 77 32 68 0 Surface Treatment - Slurry Seal 6/13/08 379 10344 LAS FLORES ST FALCON AVE ELLIS AVE E E7 1,316 36 47,376 4/24/24 78 47 49 4 Surface Treatment - Slurry Seal 6/13/08 7 10006 AMAZON RIVER CIR SANTA LAURETTA CIR EAST END E B6 420 33 16,920 4/6/22 78 92 8 0 Overlay - AC Structural 7/1/11 72 10062 BUTTONWOOD ST WARNER AVE BANYAN ST E D4 2,521 36 92,706 4/21/21 78 61 31 8 Surface Treatment - Slurry Seal 5/25/01 92 10078 CARDINAL AVE SANTA MARIA ST SANTA BARBARA ST E B7 1,202 36 43,272 4/1/22 78 100 0 0 Overlay - AC Structural 7/1/11 109 10094 CIRCULO DE JUAREZ CALLE ZARAGOZA EAST END E E4 1,142 33 39,251 3/14/23 78 84 0 16 Overlay - AC Structural 6/22/12 126 10109 CORMORANT CIR LINDEN ST EAST END E C6 392 33 14,192 4/22/22 78 82 15 3 Surface Treatment - Slurry Seal 7/1/23 137 10117 DAKOTA ST GARFIELD AVE WOODPECKER AVE E B7 551 36 20,772 4/6/22 78 80 20 0 Overlay - AC Structural 7/1/11 218 10192 ELM ST EL ARBOL AVE LA CORTINILLA AVE E C5 990 36 35,640 4/28/22 78 76 24 0 Overlay - AC Structural 5/1/10 995 10952 INDIAN RIVER CT SHENANDOAH ST MUIR WOODS CT E E6 224 22 4,928 3/7/23 78 35 65 0 Overlay - AC Structural 6/1/12 360 10326 LA PLAYA CIR WEST END SANTA MARIANA ST E B5 183 33 9,099 4/29/22 78 78 22 0 Overlay - AC Structural 7/1/11 1010 10969 MAGNOLIA FRONTAGE #1 LA ROCA AVE NORTH END E B5 480 27 13,971 4/29/22 78 30 70 0 Overlay - AC Structural 7/1/11 439 10399 MARTIN AVE SANTA RAMONA ST MAGNOLIA ST E B7 531 36 19,116 4/25/22 78 80 20 0 Overlay - AC Structural 7/1/11 959 10913 MUIR WOODS CT ADOBE RIVER AVE END E E6 288 22 6,336 3/7/23 78 48 52 0 Overlay - AC Structural 6/1/12 576 10530 OTTAWA RIVER CIR WEST END SANTA ARABELLA ST E B6 484 33 19,017 4/6/22 78 88 12 0 Overlay - AC Structural 7/1/11 633 10583 REDBUD CIR SWIFT AVE NORTH END E C6 508 33 19,264 4/25/22 78 84 16 0 Surface Treatment - Slurry Seal 5/31/03 696 10641 SAN RAFAEL ST LA QUINTA CIR SOUTH END E E5 1,667 36 58,932 3/2/23 78 71 0 29 Surface Treatment - Slurry Seal 7/1/23 709 10653 SANTA ARABELLA ST MACKENZIE RIVER AVE OTTAWA RIVER CIR E B6 1,178 36 44,208 4/6/22 78 93 7 0 Overlay - AC Structural 7/1/11 729 10673 SANTA IRENE ST CANARY AVE SUNBIRD AVE E B7 371 36 14,292 4/1/22 78 87 13 0 Overlay - AC Structural 7/1/11 734 10678 SANTA LAURETTA ST TRINITY RIVER CIR NORTH END E B6 1,187 36 45,777 4/6/22 78 83 17 0 Overlay - AC Structural 7/1/11 7002 10830 WREN CIR SANTA RAMONA ST EAST END E B7 442 33 16,106 4/25/22 78 77 20 3 Overlay - AC Structural 7/1/11 892 10823 YOUNG RIVER AVE MT. WYNNE CIR MT. HERRMANN ST I G4 512 42 21,879 4/26/21 78 80 19 1 Overlay - AC Structural 8/1/09 894 10825 YUCCA CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 78 51 49 0 Overlay - AC Structural 6/13/08 305 10272 KALAMA RIVER AVE EUCLID ST MT. SHAY ST I F6 1,060 36 38,160 4/25/24 78 95 0 5 Overlay - AC Structural 8/1/09 678 10624 SAN FELIPE ST ROBIN AVE PHEASANT AVE E E7 901 36 34,308 4/26/24 79 100 0 0 Overlay - AC Structural 6/13/08 20 10019 ASH ST EL ARBOL AVE LA CORTINILLA AVE E C5 987 36 35,532 4/28/22 79 70 30 0 Overlay - AC Structural 6/1/10 78 10067 CALLE INDEPENDENCIA CALLE ZARAGOZA WARD ST E E4 1,321 36 47,556 3/14/23 79 80 0 20 Overlay - AC Structural 6/22/12 79 10068 CALLE MADERO WARD ST WEST END E E4 967 36 33,407 3/14/23 79 80 0 20 Overlay - AC Structural 6/22/12 125 10108 CORK ST BLACKBIRD AVE ELLIS AVE E C7 534 36 19,224 4/25/22 79 81 19 0 Surface Treatment - Slurry Seal 5/25/03 276 10245 HELM AVE MAGNOLIA ST SECOND ST E C6 803 36 29,844 4/22/22 79 100 0 0 Surface Treatment - Slurry Seal 7/1/23 280 10249 HERON AVE PALM ST CORK ST E C7 658 36 24,624 4/25/22 79 90 10 0 Surface Treatment - Chip Seal 5/25/03 334 10300 LA CRESCENTA AVE MAGNOLIA ST WINTERBERRY ST E C5 517 36 20,712 4/29/22 79 61 39 0 Overlay - AC Structural 6/1/10 423 10385 MACKENZIE RIVER AVE SANTA ARABELLA ST SANTA JOANANA CIR E B6 772 36 29,592 4/25/22 79 75 25 0 Overlay - AC Structural 7/1/11 516 10474 MT LANGLEY ST ELLIS AVE SPENCER AVE I F6 1,291 46 59,386 4/22/21 79 70 28 2 Overlay - AC Structural 8/1/09 549 10505 NADINE RIVER CIR WEST END MT. STEWART CIR E C6 317 32 10,144 4/29/22 79 72 28 0 Surface Treatment - Slurry Seal 7/1/23 994 10951 NAPA RIVER CT SUNSET CT SHENANDOAH ST E E6 243 22 5,346 3/7/23 79 22 47 31 Overlay - AC Structural 6/1/12 608 10561 PINYON CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 79 63 37 0 Overlay - AC Structural 5/1/08 730 10674 SANTA ISABEL ST EL LIBRO AVE EL RANCHO AVE E B4 2,002 36 75,672 3/14/23 79 53 25 22 Surface Treatment - Slurry Seal 6/13/08 744 10688 SANTA MARTA ST TERN AVE NIGHTINGALE AVE E B7 1,011 36 36,396 4/1/22 79 85 15 0 Overlay - AC Structural 7/1/11 748 10692 SANTA RAMONA ST SOUTH END WREN AVE E B7 836 36 31,948 4/25/22 79 86 14 0 Overlay - AC Structural 7/1/11

Page 6 of 20 ends
Page 94 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 756 10700 SANTA TOMASA CIR HUMMINGBIRD AVE NORTH END E B7 464 33 16,832 4/25/22 79 91 9 0 Overlay - AC Structural 7/1/11 764 10708 SEINE RIVER AVE SANTA CARLOTTA ST SANTA EUGENIA ST E B6 246 36 10,656 4/25/22 79 83 17 0 Overlay - AC Structural 7/1/11 817 10754 SWORDFISH AVE SANTA VALERIA ST MAGNOLIA ST E B5 1,169 36 42,084 4/28/22 79 49 51 0 Overlay - AC Structural 7/1/11 830 10766 TERN AVE SANTA MARIANA ST SANTA MARTA ST E B7 271 36 11,628 4/1/22 79 91 9 0 Overlay - AC Structural 7/1/11 858 10793 WADE RIVER CIR WEST END SANTA ISADORA ST E B7 144 30 4,320 4/1/22 79 100 0 0 Overlay - AC Structural 7/1/11 35 10029 BANYAN ST LA TIERRA CIR STARFISH AVE E D4 787 30 27,890 4/21/21 80 77 9 14 Surface Treatment - Slurry Seal 5/25/01 50 10042 BLAIR RIVER CIR MT. KRISTINA ST EAST END E C6 613 32 20,872 4/25/22 80 84 16 0 Surface Treatment - Slurry Seal 7/1/23 936 10892 CABRILLO CT END ADOBE RIVER AVE E E6 254 22 5,588 3/7/23 80 36 64 0 Overlay - AC Structural 6/1/12 128 10110 COTTONWOOD ST MALLARD AVE NORTH END E C7 991 36 35,987 4/25/22 80 85 15 0 Surface Treatment - Chip Seal 5/25/03 140 10120 DARTER CIR TOMAHAWK ST EAST END E B7 228 33 9,536 4/6/22 80 90 10 0 Overlay - AC Structural 7/1/11 158 10135 EL ARBOL AVE OAK ST EAST END E C5 669 36 24,084 4/28/22 80 82 18 0 Overlay - AC Structural 6/1/10 192 10169 EL PORTAL CIR BUTTONWOOD ST EAST END E D4 912 36 35,282 4/21/21 80 83 17 0 Overlay - AC Fabric 6/1/10 1009 10968 ELLIS FRONTAGE #1 SANTA CARLOTTA ST SANTA ALBERTA CIR E B6 740 27 19,980 4/25/22 80 60 40 0 Overlay - AC Structural 7/1/11 258 10228 GLADSTONE CIR MT. COLLIEN ST EAST END E H3 524 33 17,292 4/22/24 80 39 0 61 Overlay - AC Structural 8/30/19 263 10233 GRACKLE AVE PLUMOSA ST PRUNUS ST E C7 992 36 35,712 4/21/22 80 100 0 0 Surface Treatment - Slurry Seal 7/1/23 317 10283 LA AMAPOLA AVE KONIGSMARK ST CASHEW ST E D5 1,357 36 48,852 4/21/21 80 52 12 36 Surface Treatment - Slurry Seal 5/26/01 911 10867 LILAC AVE HARBOR BLVD RICHARDSON ST E H2 1,649 60 98,940 4/22/22 80 89 11 0 Overlay - AC Structural 9/1/09 418 10381 LOS TIEMPOS ST TALBERT AVE GOLDENEYE AVE E F5 511 33 18,743 3/2/23 80 56 0 44 Overlay - AC Structural 6/1/15 428 10389 MALLARD AVE PALM ST COTTONWOOD ST E C7 926 36 34,272 4/25/22 80 73 27 0 Surface Treatment - Chip Seal 5/26/03 462 10420 MONTEZUMA CIR SAN RAFAEL ST EAST END E E5 475 33 17,150 3/2/23 80 33 28 39 Surface Treatment - Slurry Seal 7/1/23 476 10434 MT BALDY CIR NORTH END SOUTH END I F6 848 36 34,124 4/22/21 80 91 9 0 Overlay - AC Structural 8/1/09 596 10550 PERALTA RIVER CIR MT. HENRY ST EAST END E D4 203 33 10,054 4/21/21 80 89 0 11 Surface Treatment - Slurry Seal 5/31/01 726 10670 SANTA EUGENIA ST THAMES RIVER AVE SEINE RIVER AVE E B6 500 35 21,100 4/25/22 80 76 20 4 Overlay - AC Structural 7/1/11 743 10687 SANTA MARIANA ST TALBERT AVE LA ROCA AVE E B5 811 36 30,202 4/28/22 80 77 23 0 Overlay - AC Structural 7/1/11 758 10702 SANTA VERONICA CIR ELLIS AVE NORTH END E B6 555 33 21,375 4/25/22 80 71 29 0 Overlay - AC Structural 7/1/11 973 10929 STAEDLER CIR STAEDLER ST END E F4 238 36 12,168 3/22/23 80 66 34 0 Overlay - AC Structural 6/1/15 889 10822 WREN AVE SANTA YNEZ ST SANTA RAMONA ST E B7 279 36 10,980 4/25/22 80 73 25 2 Overlay - AC Structural 7/1/11 804 10742 SUDITH AVE MT. VICTORY ST MT. FLETCHER CIR E G3 992 36 36,712 4/26/24 81 91 0 9 Overlay - AC Structural 6/1/16 426 10387 MAHOGANY ST GERANIUM AVE JASMINE AVE E C2 836 36 30,096 4/22/24 81 53 0 47 Surface Treatment - Slurry Seal 5/26/01 664 10612 SAN ANTONIO ST GARFIELD AVE NIGHTINGALE AVE E E7 1,040 36 37,440 4/24/24 81 43 57 0 Surface Treatment - Slurry Seal 6/13/08 664 10611 SAN ANTONIO ST FALCON AVE ELLIS AVE E E7 1,315 36 47,340 4/24/24 81 100 0 0 Overlay - AC Structural 2/26/15 472 10430 MT ACOMA CIR STONECRESS AVE NORTH END E G3 403 33 14,774 4/22/24 81 66 0 34 Overlay - AC Structural 6/1/16 505 10464 MT HERRMANN ST SLATER AVE NEWHOPE ST I G5 1,339 46 60,814 4/25/24 81 67 6 27 New Construction - Initial 1/1/80 838 10774 TILTON CIR EUCLID ST EAST END E G3 592 36 22,787 4/25/24 81 78 15 7 Overlay - AC Structural 6/1/16 85 10072 CANARY AVE SANTA YNEZ ST SANTA CARMELA ST E B7 605 36 22,716 4/1/22 81 82 18 0 Overlay - AC Structural 7/1/11 100 10085 CASHEW ST TALBERT AVE NORTH END E D5 1,297 36 46,692 4/21/21 81 57 43 0 Surface Treatment - Slurry Seal 5/25/01 111 10096 CIRCULO DE ZAPATA WARD ST WEST END E E4 864 32 29,213 3/14/23 81 86 0 14 Overlay - AC Structural 6/22/12 122 10105 CORDATA ST SHRIKE AVE TANAGER AVE E C7 1,296 36 46,656 4/21/22 81 97 0 3 Surface Treatment - Slurry Seal 7/1/23 165 10142 EL CENTRO AVE LOS ENCINOS ST LOS JARDINES EAST E F4 1,021 36 38,636 3/22/23 81 100 0 0 Overlay - AC Structural 6/1/15 166 10143 EL CERRO CIR WEST END SANTA MARIANA ST E B5 183 33 9,039 4/29/22 81 89 11 0 Overlay - AC Structural 7/1/11 175 10152 EL COSTA CIR WEST END SANTA MARIANA ST E B5 183 33 9,099 4/29/22 81 83 17 0 Overlay - AC Structural 7/1/11 194 10171 EL PUEBLO AVE BEECH ST BUSHARD ST E C5 582 36 23,052 4/22/22 81 34 66 0 Overlay - AC Structural 6/1/10 209 10183 EL VALLE AVE OAK ST CHESTNUT ST E C5 963 36 38,868 4/22/22 81 88 12 0 Overlay - AC Structural 6/1/10 320 10286 LA BALLENA CIR SAN CLEMENTE ST EAST END E E5 553 33 19,724 3/2/23 81 51 10 39 Surface Treatment - Slurry Seal 7/1/23 390 10356 LIVE OAK CIR LA LINDA CIR NORTH END E C5 454 36 16,344 4/29/22 81 75 25 0 Overlay - AC Structural 6/1/10 447 10407 MC ELWEE RIVER CIR WEST END MT. STEWART CIR E C6 317 32 11,400 4/29/22 81 78 22 0 Surface Treatment - Slurry Seal 7/1/23 528 10486 MT NORBY CIR EAST END TALBERT AVE E C6 396 32 15,800 4/29/22 81 84 16 0 Surface Treatment - Slurry Seal 5/31/03 538 10496 MT WALTON CIR GARFIELD AVE NORTH END E D7 612 33 21,452 4/24/24 81 55 27 18 Overlay - AC Structural 8/1/20 563 10519 OAK ST TALBERT AVE EL CAMINO AVE E C5 1,431 36 51,516 4/22/22 81 67 31 2 Overlay - AC Structural 6/1/10 563 10988 OAK ST EL CAMINO AVE EL VALLE AVE E C5 1,021 36 37,506 4/22/22 81 85 12 3 Overlay - AC Structural 6/1/10 573 10527 ORIOLE AVE ACACIA ST WALNUT ST E C7 297 36 11,628 4/22/22 81 87 10 3 New Construction - Initial 1/1/80 577 10531 OTTER RIVER CIR SECOND ST EAST END E C6 450 32 15,656 4/25/22 81 83 17 0 Surface Treatment - Slurry Seal 7/1/23 585 10539 PALMETTO CIR SWIFT AVE NORTH END E C6 500 33 17,756 4/25/22 81 75 25 0 Surface Treatment - Slurry Seal 5/31/03 714 10658 SANTA CARMELA ST CANARY AVE MARTIN AVE E B7 398 36 15,264 4/1/22 81 100 0 0 Overlay - AC Structural 7/1/11 725 10669 SANTA ELISE ST EL PRESIDENTE AVE EL LAGO AVE E B5 288 36 13,968 4/28/22 81 78 22 0 Overlay - AC Structural 7/1/11 1600 10827 SANTA PAULA ST EL LAGO AVE EL CAPITAN AVE E B5 296 36 10,656 4/28/22 81 74 26 0 Overlay - AC Structural 7/1/11

Page 7 of 20 ends
Page 95 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 761 10705 SARA RIVER CIR WEST END MT. STEWART CIR E C6 319 32 11,464 4/29/22 81 76 24 0 Surface Treatment - Slurry Seal 7/1/23 763 10707 SECOND ST HELM AVE TALBERT AVE E C6 1,349 36 49,500 4/22/22 81 73 27 0 Surface Treatment - Slurry Seal 7/1/23 779 10723 SISKIN AVE PLUMOSA ST PRUNUS ST E C7 986 36 36,432 4/21/22 81 100 0 0 Surface Treatment - Slurry Seal 7/1/23 797 10736 STANISLAUS ST PLACER RIVER CIR APACHE RIVER AVE E E6 979 36 35,244 3/7/23 81 62 0 38 Overlay - AC Structural 6/22/12 806 10744 SUNBIRD AVE SANTA MARIANA ST SANTA IRENE ST E B7 545 36 21,492 4/1/22 81 100 0 0 Overlay - AC Structural 7/1/11 849 10784 TULE RIVER CIR WEST END SANTA ISADORA ST E B7 144 30 5,076 4/1/22 81 78 22 0 Overlay - AC Structural 7/1/11 310 10276 KIRWIN CIR MT. COLLIEN ST EAST END E H3 522 33 18,701 4/22/24 81 34 0 66 Overlay - AC Structural 8/30/19 767 10711 SHAMROCK AVE BUSHARD ST BANANA ST E D2 1,830 36 67,760 4/26/24 82 66 0 34 Surface Treatment - Slurry Seal 12/1/21 479 10437 MT CACHUMA CIR STONECRESS AVE NORTH END E G3 403 33 14,774 4/25/24 82 100 0 0 Overlay - AC Structural 6/1/16 25 10022 AVENIDA CINCO DE MAYO CALLE ZARAGOZA WARD ST E E4 1,321 36 47,556 3/14/23 82 71 0 29 Overlay - AC Structural 6/22/12 49 10041 BLACKBIRD AVE PALM ST COTTONWOOD ST E C7 949 36 34,164 4/25/22 82 71 29 0 Surface Treatment - Chip Seal 5/25/03 57 10049 BRIARWOOD ST LA LINDA CIR SLATER AVE E C5 526 36 18,936 4/29/22 82 100 0 0 Overlay - AC Structural 6/1/10 68 10058 BUSHARD FRONTAGE #4 EL CAMINO AVE EL PUEBLO AVE E C5 406 27 10,962 4/28/22 82 54 46 0 Overlay - AC Structural 6/1/10 99 10084 CARSON RIVER CIR MT. KRISTINA ST EAST END E C6 616 32 20,968 4/25/22 82 79 21 0 Surface Treatment - Slurry Seal 7/1/23 7004 10832 DATE ST WARBLER AVE SHRIKE AVE E C7 232 36 10,224 4/21/22 82 85 15 0 Surface Treatment - Slurry Seal 7/1/23 190 10167 EL PASO AVE LOS SANTOS ST LOS JARDINES EAST E F4 843 36 32,228 3/22/23 82 61 39 0 Overlay - AC Structural 6/1/15 954 10909 EL SILBIDO AVE REIMER ST LOS JARDINES WEST E F4 575 36 21,200 3/22/23 82 100 0 0 Overlay - AC Structural 6/1/15 956 10911 FALL RIVER CT BRYCE CT END E E6 644 22 14,168 3/7/23 82 30 70 0 Overlay - AC Structural 6/1/12 289 10258 HUMMINGBIRD AVE SANTA ANDREA ST SANTA YNEZ ST E B7 821 36 30,492 4/25/22 82 78 19 3 Overlay - AC Structural 7/1/11 314 10280 LA ALAMEDA AVE BROOKHURST ST SAN MATEO ST E B4 849 50 42,450 4/21/21 82 76 0 24 Overlay - AC Structural 8/1/09 324 10290 LA BAYA AVE SANTA ISABEL ST SANTA MARIA ST E B4 320 36 13,620 3/14/23 82 96 0 4 Surface Treatment - Slurry Seal 6/13/08 331 10297 LA COLONIA AVE SANTA LUCIA ST SANTA SUZANNE ST E B4 300 36 10,800 3/14/23 82 49 51 0 Overlay - AC Structural 1/1/07 333 10299 LA CORTINILLA AVE OAK ST ASH ST E C5 536 36 22,896 4/28/22 82 65 35 0 Overlay - AC Structural 6/1/10 374 10340 LA TORTOLA CIR SAN CLEMENTE ST EAST END E E5 265 33 10,220 3/2/23 82 69 0 31 Surface Treatment - Slurry Seal 7/1/23 907 10863 LOS JARDINES WEST WARNER AVE EL TIBURON AVE E F4 707 36 23,952 4/7/22 82 42 58 0 Overlay - AC Structural 8/1/09 497 10455 MT ERIN CIR CORIENDER AVE NORTH END E G3 458 33 16,589 4/26/21 82 82 14 4 Overlay - AC Structural 6/1/16 504 10462 MT HENRY ST STARFISH AVE PERALTA RIVER CIR E D4 255 33 10,295 4/21/21 82 97 0 3 Surface Treatment - Slurry Seal 5/31/01 556 10511 NIGHTINGALE AVE SANTA MARIANA ST MAGNOLIA ST E B7 1,643 36 59,148 4/1/22 82 87 13 0 Overlay - AC Structural 7/1/11 579 10533 OWENS RIVER CIR NORTHWEST END MORONGO ST E B7 149 30 5,226 4/1/22 82 100 0 0 Overlay - AC Structural 7/1/11 591 10545 PELICAN AVE PALM ST COTTONWOOD ST E C7 932 36 33,552 4/25/22 82 67 30 3 New Construction - Initial 1/1/80 593 10547 PENNELL CIR MT. HOPE ST EAST END E G3 522 33 18,701 4/26/21 82 85 13 2 Overlay - AC Structural 6/1/16 929 10885 REIMER ST LOS JARDINES WEST EL SILBIDO AVE E F4 790 36 28,940 3/22/23 82 97 0 3 Overlay - AC Structural 6/1/15 686 10631 SAN LEON AVE SAN MINISO CIR SAN CANDELO ST E F5 1,001 36 37,916 3/22/23 82 66 22 12 Overlay - AC Structural 6/1/15 703 10647 SANDSTONE AVE MT. HOPE ST MT. EDEN ST E G3 812 36 29,232 4/26/21 82 100 0 0 Overlay - AC Structural 6/1/16 707 10651 SANTA ANDREA ST HUMMINGBIRD AVE ELLIS AVE E B7 509 36 19,260 4/25/22 82 76 24 0 Overlay - AC Structural 7/1/11 719 10663 SANTA CLARA CIR SOUTH END SWALLOW AVE E B7 600 36 23,120 4/6/22 82 89 11 0 Overlay - AC Structural 7/1/11 721 10665 SANTA CLAUDIA ST MOCKINGBIRD CIR TALBERT AVE E B6 513 36 20,268 4/29/22 82 78 22 0 Overlay - AC Structural 7/1/11 732 10676 SANTA ISADORA ST ELLIS AVE PHOENIX AVE E B6 510 36 20,160 4/1/22 82 72 28 0 Overlay - AC Structural 7/1/11 738 10682 SANTA MADRINA CIR SOUTH END SWALLOW AVE E B7 600 36 23,120 4/6/22 82 100 0 0 Overlay - AC Structural 7/1/11 840 10776 TOIYABE ST HAMILTON AVE STURGEON AVE E D5 944 36 30,920 4/21/21 82 61 36 3 New Construction - Initial 1/1/80 841 10777 TOMAHAWK ST WOODPECKER AVE BLUEBIRD AVE E B7 821 36 29,556 4/6/22 82 82 18 0 Overlay - AC Structural 7/1/11 602 10556 PHEASANT AVE SAN FELIPE ST LAS FLORES ST E E7 488 36 18,504 4/26/24 82 77 12 11 Overlay - AC Structural 6/13/08 444 10404 MCCABE RIVER CIR MT. MARCUS ST EAST END E G3 148 33 6,359 4/25/24 83 100 0 0 Overlay - AC Structural 6/1/16 580 10534 OWL CIR SAN ANTONIO ST EAST END E E7 465 32 16,136 4/26/24 83 63 37 0 Surface Treatment - Slurry Seal 6/13/08 406 10370 LOS JARDINES EAST SLATER AVE LOS JARDINES WEST E F4 2,494 36 89,784 4/23/24 83 88 12 0 Overlay - AC Structural 8/1/09 231 10203 FIG ST JASMINE AVE HONEYSUCKLE AVE E C2 277 36 9,972 4/22/24 83 31 69 0 Surface Treatment - Slurry Seal 5/25/01 410 10373 LOS LEONES ST CARDINAL AVE NIGHTINGALE AVE E E7 279 36 10,980 4/24/24 83 50 45 5 Overlay - AC Structural 6/13/08 8 10007 AMBERWOOD CIR WEST END EAST END E E5 435 33 17,305 3/2/23 83 47 14 39 Surface Treatment - Slurry Seal 7/1/23 909 10865 AVENIDA ABUELITOS AVENIDA COMPADRES CAMINO REAL E F4 242 21 5,082 3/22/23 83 40 60 0 Overlay - AC Structural 6/1/15 85 10073 CANARY AVE SANTA MARIANA ST SANTA YNEZ ST E B7 847 36 30,492 4/1/22 83 79 21 0 Overlay - AC Structural 7/1/11 92 10077 CARDINAL AVE PALM ST WALNUT ST E C7 931 36 33,516 4/22/22 83 100 0 0 Surface Treatment - Chip Seal 5/25/03 108 10093 CHUKAR CIR TOMAHAWK ST EAST END E B7 229 33 9,077 4/6/22 83 88 12 0 Overlay - AC Structural 7/1/11 119 10102 CONDOR AVE EUCLID ST MT. BALDY CIR E G6 430 36 15,480 4/22/21 83 96 0 4 Surface Treatment - Slurry Seal 5/25/02 148 10127 DIXIE ST SLATER AVE EL REY AVE E D4 303 36 10,908 4/21/21 83 80 20 0 Surface Treatment - Slurry Seal 5/25/01 941 10897 DURANGO RIVER CT YOSEMITE CT SUNSET CT E E6 1,007 21 21,147 3/7/23 83 47 0 53 Overlay - AC Structural 6/1/12 171 10148 EL COLORADO AVE BRIARWOOD ST WALNUT ST E C5 716 36 27,876 4/29/22 83 78 22 0 Overlay - AC Structural 6/1/10

Page 8 of 20 ends
Page 96 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 186 10163 EL MONTEREY AVE LOS ALAMOS ST SAN FRANCISCO ST E E5 1,104 36 39,744 3/2/23 83 73 0 27 Surface Treatment - Slurry Seal 7/1/23 10850 10850 EL REY CIR EL REY AVE END E D4 348 36 12,528 4/21/21 83 91 9 0 New Construction - Initial 1/1/80 210 10184 EL VERDE CIR WEST END WALNUT ST E C5 361 33 14,973 4/29/22 83 80 20 0 Overlay - AC Structural 6/1/10 216 10189 ELLIS FRONTAGE #2 LINDEN ST EAST END E C6 430 27 12,403 4/25/22 83 73 27 0 Surface Treatment - Slurry Seal 7/1/23 229 10201 FALLENLEAF CIR NORTH END BUSHARD ST E C6 780 24 22,496 4/25/22 83 70 28 2 Surface Treatment - Chip Seal 5/25/03 238 10209 FLICKER AVE PLUMOSA ST PRUNUS ST E C7 996 36 35,856 4/21/22 83 90 10 0 Surface Treatment - Slurry Seal 7/1/23 247 10219 GARDENIA AVE DAISY AVE BUSHARD ST E C3 2,222 36 79,992 3/6/23 83 33 46 21 Surface Treatment - Slurry Seal 6/17/08 268 10238 GULL CIR LINDEN ST EAST END E C6 391 33 14,159 4/22/22 83 78 22 0 Surface Treatment - Slurry Seal 7/1/23 301 10269 JOSHUA CIR LA CRESCENTA AVE NORTH END E C5 376 33 12,408 4/29/22 83 72 20 8 Overlay - AC Structural 6/1/10 330 10296 LA CEBRA AVE SAN CLEMENTE ST SAN FRANCISCO ST E E5 844 36 34,144 3/2/23 83 73 0 27 Surface Treatment - Slurry Seal 7/1/23 367 10334 LA STELLA AVE PEPPER TREE ST WALNUT ST E C4 671 36 24,156 3/8/23 83 65 35 0 Surface Treatment - Slurry Seal 5/26/01 372 10338 LA TIERRA CIR BANYAN ST EAST END E D4 384 36 17,179 4/21/21 83 100 0 0 Surface Treatment - Slurry Seal 5/26/01 393 10359 LOCUST ST EL CAMINO AVE EL BLANCO AVE E C5 705 36 26,316 4/22/22 83 100 0 0 Overlay - AC Structural 6/1/10 430 10390 MANGO CIR EL CAMINO AVE NORTH END E C5 132 33 7,416 4/28/22 83 100 0 0 Overlay - AC Structural 6/1/10 477 10435 MT BAXTER CIR STONECRESS AVE NORTH END E G3 403 33 14,774 4/25/24 83 71 0 29 Overlay - AC Structural 6/1/16 484 10442 MT CLIFFWOOD CIR SLATER AVE NORTH END I G4 553 36 21,383 4/26/21 83 86 11 3 Overlay - AC Structural 8/1/09 523 10481 MT MORGAN CIR SOUTH END GRIPPO RIVER AVE E C7 383 32 13,696 4/21/22 83 89 11 0 Surface Treatment - Slurry Seal 7/1/23 988 10945 OLYMPIC CT KINGS CANYON ST END E E6 156 22 3,432 3/7/23 83 70 30 0 Overlay - AC Structural 6/1/12 609 10562 PIPESTONE ST SAN RAFAEL ST LOS ALAMOS ST E E5 389 36 14,004 3/2/23 83 91 0 9 Surface Treatment - Slurry Seal 7/1/23 611 10564 PLUMOSA ST TANAGER AVE ELLIS AVE E C7 896 36 33,192 4/21/22 83 100 0 0 Surface Treatment - Slurry Seal 7/1/23 660 10607 SALINAS RIVER CIR STANISLAUS ST EAST END E E6 625 33 21,881 3/7/23 83 100 0 0 Overlay - AC Structural 6/1/12 672 10619 SAN CLEMENTE ST LA TORTOLA AVE LA CEBRA AVE E E5 860 36 32,840 3/2/23 83 77 0 23 Surface Treatment - Slurry Seal 7/1/23 690 10635 SAN MARINO CIR EL MONTEREY AVE NORTH END E E5 373 33 13,784 3/2/23 83 41 0 59 Surface Treatment - Slurry Seal 7/1/23 743 10686 SANTA MARIANA ST TERN DR SUNBIRD AVE E B7 1,621 36 60,228 4/1/22 83 89 11 0 Overlay - AC Structural 7/1/11 759 10703 SANTA YNEZ ST NIGHTENGALE AVE WREN AVE E B7 1,273 36 46,764 4/1/22 83 89 11 0 Overlay - AC Structural 7/1/11 778 10722 SIOUX RIVER CIR STANISLAUS ST EAST END E E6 621 33 21,749 3/7/23 83 97 0 3 Overlay - AC Structural 6/1/12 789 10729 SPARKLEBERRY ST LA CAPILLA AVE LA ESPERANZA AVE E D4 506 36 20,096 4/14/22 83 80 20 0 Surface Treatment - Slurry Seal 5/31/01 811 10750 SWALLOW AVE SAN FELIPE ST SAN BLAS ST E E7 729 36 27,180 4/26/24 83 59 41 0 Surface Treatment - Slurry Seal 6/13/08 816 10753 SWIFT AVE REDBUD CIR BUSHARD ST E C6 469 36 17,820 4/25/22 83 66 34 0 New Construction - Initial 1/1/80 833 10769 THAMES RIVER AVE SANTA EUGENIA ST SANTA BELINDA CIR E B6 496 36 21,456 4/25/22 83 79 21 0 Overlay - AC Structural 7/1/11 834 10770 THIRD ST HELM AVE TALBERT AVE E C6 1,321 36 47,556 4/22/22 83 85 15 0 Surface Treatment - Slurry Seal 7/1/23 887 10820 WOODPECKER AVE SANTA ISADORA ST DAKOTA ST E B7 380 36 14,616 4/6/22 83 89 0 11 Overlay - AC Structural 7/1/11 893 10824 YUBA RIVER AVE SANTA RAMONA ST MAGNOLIA ST E B7 518 36 18,648 4/25/22 83 76 24 0 Overlay - AC Structural 7/1/11 3 10002 ACKLAY CIR WEST END KONIGSMARK ST E D5 352 32 11,264 4/24/24 83 95 0 5 Surface Treatment - Slurry Seal 5/25/01 435 10395 MARIGOLD AVE SPRUCE ST SYCAMORE ST E D2 662 36 23,832 4/22/24 83 63 37 0 Surface Treatment - Slurry Seal 12/1/21 795 10734 SPRUCE ST HEIL AVE GARDENIA AVE E D3 518 36 18,648 4/22/24 83 100 0 0 Surface Treatment - Slurry Seal 9/1/22 671 10618 SAN CARLOS ST GARFIELD AVE CARDINAL AVE E E7 752 36 28,008 4/24/24 84 98 0 2 Overlay - AC Structural 6/13/08 9 10008 AMISTAD ST ELLIS AVE BECHLER RIVER AVE E F6 440 36 16,776 4/25/24 84 50 22 28 Overlay - AC Structural 8/1/09 241 10212 FOOTHILL ST HEIL AVE AZALEA AVE E H2 190 36 6,840 4/23/24 84 41 0 59 Overlay - AC Structural 8/31/18 624 10574 QUARTZ AVE NEWHOPE ST MT. YOUNIS ST E H3 1,460 37 54,020 4/23/24 84 33 0 67 Overlay - AC Structural 8/30/19 92 10076 CARDINAL AVE SAN FELIPE ST SAN CARLOS ST E E7 1,037 36 38,268 4/24/24 84 46 54 0 Surface Treatment - Slurry Seal 6/13/08 237 10208 FLAMINGO AVE JACARANDA ST EAST END E D6 521 36 18,756 4/25/24 84 77 23 0 Surface Treatment - Slurry Seal 7/1/23 647 10594 ROBIN AVE SAN FELIPE ST LAS FLORES ST E E7 484 36 18,360 4/24/24 84 100 0 0 Overlay - AC Structural 6/13/08 227 10200 FALCON AVE SAN FELIPE ST WARD ST E E7 1,815 36 66,276 4/24/24 84 62 27 11 Overlay - AC Structural 6/13/08 866 10800 WARNER FRONTAGE #2 MT. HOPE ST EAST END E G3 615 33 20,910 4/25/24 84 100 0 0 Overlay - AC Structural 6/1/16 14 10013 APACHE RIVER AVE STANISLAUS ST WARD ST E E6 661 36 23,796 3/7/23 84 100 0 0 Overlay - AC Structural 6/1/12 41 10035 BEGONIA AVE RUSHMORE ST SUGARLOAF ST E G3 970 36 34,920 4/26/21 84 73 17 10 Overlay - AC Structural 6/1/16 934 10890 BIG BEN CT ADOBE RIVER AVE CORRAL RIVER CT E E6 191 22 4,202 3/7/23 84 38 62 0 Overlay - AC Structural 6/1/12 80 10069 CALLE ZARAGOZA CALLE INDEPENDENCIA AVENIDA CINCO DE MAYO E E4 660 30 19,800 3/14/23 84 27 37 36 Overlay - AC Structural 6/22/12 89 10075 CAPENSE ST WARBLER AVE GROUSE AVE E C7 1,299 36 48,636 4/21/22 84 100 0 0 Surface Treatment - Slurry Seal 7/1/23 114 10098 COCKATOO AVE PALM ST WALNUT ST E C7 936 36 34,632 4/22/22 84 100 0 0 New Construction - Initial 1/1/80 9008 10849 COLONIAL CIR PERCH AVE NORTH END E F4 320 32 13,595 3/22/23 84 75 18 7 Overlay - AC Structural 6/1/15 118 10101 COLVILLE ST ELLIS AVE TOUCAN AVE E C6 1,148 36 42,264 4/21/22 84 86 14 0 Surface Treatment - Slurry Seal 7/1/23 160 10137 EL AZUL CIR WEST END WALNUT ST E C5 362 33 15,006 4/29/22 84 51 49 0 Overlay - AC Structural 6/1/10 182 10159 EL MANZANO AVE WARD ST SAN RICARDO ST E F4 516 36 18,576 3/22/23 84 100 0 0 Overlay - AC Structural 6/1/15 186 10164 EL MONTEREY AVE SAN RAFAEL ST LOS ALAMOS ST E E5 744 36 26,784 3/2/23 84 76 15 9 Surface Treatment - Slurry Seal 7/1/23

Page 9 of 20 ends
Page 97 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 201 10176 EL SOL AVE PALM ST WALNUT ST E C4 974 36 35,064 3/8/23 84 71 29 0 Surface Treatment - Slurry Seal 5/25/01 204 10179 EL TAMBOR AVE BUTTONWOOD ST APRICOT CIR E D4 281 33 11,153 4/14/22 84 69 25 6 Surface Treatment - Slurry Seal 5/25/01 208 10182 EL TULIPAN CIR WEST END CASHEW ST E D5 418 32 14,632 4/21/21 84 87 12 1 Surface Treatment - Slurry Seal 5/25/01 226 10198 EVERGREEN CIR ROSE AVE NORTH END E D3 415 33 15,170 4/22/21 84 87 13 0 Surface Treatment - Slurry Seal 9/1/22 244 10215 FREMONT ST STURGEON ST DOLPHIN AVE E D5 1,106 36 34,456 4/21/21 84 89 11 0 Surface Treatment - Slurry Seal 5/25/01 249 10220 GARFIELD FRONTAGE #1 DAKOTA ST WEST END E B7 430 27 12,621 4/6/22 84 100 0 0 Overlay - AC Structural 7/1/11 326 10292 LA CARTA AVE LOS JARDINES EAST SAN LORENZO CIR E F4 358 36 14,768 3/22/23 84 75 25 0 Overlay - AC Structural 6/1/15 337 10304 LA ESTRELLA AVE PEPPER TREE ST WALNUT ST E C4 671 36 26,576 3/8/23 84 100 0 0 Surface Treatment - Slurry Seal 5/26/01 355 10321 LA MORA CIR SPARKLEBERRY ST EAST END E D4 393 33 14,225 4/14/22 84 63 37 0 Surface Treatment - Slurry Seal 5/26/01 359 10325 LA PERLA AVE LOS ESTADOS ST LOS VASOS ST E F5 960 36 36,440 3/2/23 84 100 0 0 Overlay - AC Structural 6/1/15 364 10330 LA ROSA LN LA FUENTE ST LA LIMA ST E F5 1,682 28 48,032 3/2/23 84 66 0 34 Overlay - AC Structural 6/1/15 371 10336 LA TERRAZA AVE LOS ENCINOS ST LOS JARDINES EAST E F4 990 36 37,520 3/22/23 84 100 0 0 Overlay - AC Structural 6/1/15 385 10352 LEHNHARDT AVE FIGUEROA ST (SA) MT. JACKSON ST E I2 730 36 26,064 4/23/24 84 79 21 0 Overlay - AC Structural 8/30/19 389 10355 LINDEN ST ELLIS AVE TOUCAN AVE E C6 1,175 36 42,300 4/21/22 84 100 0 0 Surface Treatment - Slurry Seal 7/1/23 442 10402 MC BRIDE RIVER AVE MT. KRISTINA ST MT. STEWART CIR E C6 948 36 35,064 4/25/22 84 78 22 0 Surface Treatment - Slurry Seal 7/1/23 465 10423 MOPAN RIVER AVE MT. WATERMAN ST STANISLAUS ST E E6 507 36 18,252 3/7/23 84 100 0 0 Overlay - AC Structural 6/1/12 515 10473 MT KRISTINA ST MCBRIDE RIVER AVE HELM AVE E C6 1,129 36 41,580 4/21/22 84 79 15 6 Surface Treatment - Slurry Seal 7/1/23 556 10513 NIGHTINGALE AVE LOS LEONES ST SAN ANTONIO ST E E7 1,000 36 36,936 4/24/24 84 32 68 0 Surface Treatment - Slurry Seal 6/13/08 563 10517 OAK ST LA COLONIA AVE LA PALOMA AVE E C4 1,430 36 53,580 3/8/23 84 21 51 28 Surface Treatment - Slurry Seal 5/31/01 570 10524 ORANGE ST LA CAPILLA AVE LA ESPERANZA AVE E D4 504 36 18,144 4/14/22 84 41 41 18 Surface Treatment - Slurry Seal 5/31/01 662 10609 SAN ALFREDO CIR EL MANZANO AVE NORTH END E F4 192 32 7,619 3/22/23 84 48 52 0 Overlay - AC Structural 6/1/15 680 10626 SAN FRANCISCO ST LA CEBRA AVE EL MONTE AVE E E5 649 36 27,124 3/2/23 84 58 0 42 Surface Treatment - Slurry Seal 7/1/23 698 10643 SAN SIMEON ST EL MONTEREY AVE NORTH END E E5 389 33 12,837 3/2/23 84 47 34 19 Surface Treatment - Slurry Seal 7/1/23 708 10652 SANTA ANITA CIR LA ROCA AVE NORTH END E B5 381 33 12,573 4/29/22 84 100 0 0 Overlay - AC Structural 7/1/11 811 10749 SWALLOW AVE PALM ST ACACIA ST E C7 605 36 23,652 4/22/22 84 84 16 0 New Construction - Initial 1/1/80 819 10756 SYLVANITE CIR MT. EDEN ST EAST END E G3 410 36 16,235 4/26/21 84 85 15 0 Overlay - AC Structural 6/1/16 1007 10966 TALBERT FRONTAGE #1 BAY ST EAST END E C5 457 26 12,827 4/25/22 84 100 0 0 Overlay - AC Structural 6/1/10 855 10790 VIREO CIR LOS CANARIOS ST EAST END E E6 396 33 14,324 3/7/23 84 74 26 0 Overlay - AC Structural 6/1/12 881 10814 WINEMAST ST STARFISH AVE SHRINER CIR E D4 554 36 21,824 4/21/21 84 75 24 1 New Construction - Initial 1/1/80 443 10403 MC CABE RIVER AVE MT. CITADEL ST MT. MARCUS ST E G3 189 36 7,304 4/26/24 84 100 0 0 Overlay - AC Structural 6/1/16 795 10735 SPRUCE ST HEIL AVE MARIGOLD AVE E D2 783 36 28,188 4/22/24 84 87 0 13 Surface Treatment - Slurry Seal 12/1/21 151 10130 DOVE CIR WEST END BIRCH ST E D6 440 32 15,336 4/25/24 84 65 35 0 Surface Treatment - Slurry Seal 7/1/23 537 10495 MT VICTORY ST TILTON CIR SUDITH AVE E G3 283 36 10,688 4/26/24 85 100 0 0 Overlay - AC Structural 6/1/16 7008 10836 TOUCAN CIR JACARANDA ST EAST END E D6 420 33 15,116 4/25/24 85 73 27 0 Surface Treatment - Slurry Seal 7/1/23 77 10066 CALLA CIR MAHOGANY ST EAST END E C2 174 33 7,217 4/22/24 85 100 0 0 Surface Treatment - Slurry Seal 5/25/01 486 10444 MT COLLIEN ST WARNER AVE KIRWIN CIR E H3 661 36 23,796 4/22/24 85 28 0 72 Overlay - AC Structural 8/30/19 518 10476 MT MARCUS ST MCCABE RIVER AVE WARNER AVE E G3 210 36 7,560 4/25/24 85 92 0 8 Overlay - AC Structural 6/1/16 30 10024 AZALEA AVE SIERRA ST EVEREST ST E H2 1,621 33 55,373 4/23/24 85 95 0 5 Overlay - AC Structural 6/1/18 7010 10838 PLACER RIVER CIR STANISLAUS ST EAST END E E6 619 33 21,683 4/25/24 85 84 16 0 Overlay - AC Structural 6/1/12 5 10004 ADOBE RIVER AVE BROOKHURST ST OLYMPIC CT E E6 1,733 36 56,617 4/8/22 85 59 35 6 Overlay - AC Structural 5/1/10 981 10938 ARCHES CT CORRAL RIVER CT ADOBE RIVER AVE E E6 261 22 5,742 3/7/23 85 58 37 5 Overlay - AC Structural 6/1/12 38 10032 BAY ST TALBERT AVE NORTH END E C5 1,677 36 63,972 4/22/22 85 73 22 5 Overlay - AC Structural 6/1/10 40 10034 BEECH ST EL CAMINO AVE EL PUEBLO AVE E C5 407 36 16,752 4/22/22 85 70 30 0 Overlay - AC Structural 6/1/10 51 10043 BLUEBIRD AVE TOMAHAWK ST SANTA MARIANA ST E B7 507 36 18,252 4/1/22 85 100 0 0 Overlay - AC Structural 7/1/11 157 10134 EL ADELANTE AVE LOS JARDINES WEST SAN FABIAN ST E F5 444 36 17,864 3/2/23 85 95 0 5 Overlay - AC Structural 6/1/15 167 10144 EL CHINO AVE LOS JARDINES EAST SAN CANDELO ST E F5 279 36 10,044 3/22/23 85 60 40 0 Overlay - AC Structural 6/1/15 169 10146 EL CLAVEL AVE CASHEW ST TOIYABE ST E D5 315 33 10,395 4/21/21 85 82 18 0 Surface Treatment - Slurry Seal 5/25/01 177 10154 EL ESTE AVE WARD ST LOS VASOS ST E F5 1,143 36 43,028 3/2/23 85 72 0 28 Overlay - AC Structural 6/1/15 202 10177 EL SOL CIR WEST END POPLAR ST E C4 150 36 8,460 3/8/23 85 100 0 0 Surface Treatment - Slurry Seal 5/25/01 205 10180 EL TANGO CIR BAY ST EAST END E C5 340 33 14,280 4/25/22 85 100 0 0 Overlay - AC Structural 6/1/10 973 10928 EL TIBURON AVE STAEDLER ST LOS JARDINES WEST E F4 265 36 9,540 3/22/23 85 100 0 0 Overlay - AC Structural 6/1/15 260 10230 GOLDENEYE AVE LOS TIEMPOS ST EUCLID ST E F5 1,143 36 43,028 3/2/23 85 100 0 0 Overlay - AC Structural 6/1/15 307 10274 KINGBIRD AVE LOS CANARIOS ST MT. WATERMAN ST E E6 510 36 18,360 3/7/23 85 52 48 0 Overlay - AC Structural 6/1/12 311 10277 KIWI CIR LINDEN ST EAST END E C6 390 33 14,126 4/25/22 85 74 26 0 Surface Treatment - Slurry Seal 7/1/23 318 10284 LA ARENA CIR WEST END CASHEW ST E D5 424 32 14,824 4/21/21 85 100 0 0 Surface Treatment - Slurry Seal 5/26/01 321 10287 LA BARCA CIR BAY ST EAST END E C5 340 33 14,280 4/25/22 85 100 0 0 Overlay - AC Structural 6/1/10

Page 10 of 20 ends
Page 98 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 322 10288 LA BATISTA AVE LOS JARDINES EAST LOS PINTOS CIR E F4 221 36 9,836 4/7/22 85 100 0 0 Overlay - AC Structural 6/1/15 325 10291 LA CAPILLA AVE BUTTONWOOD ST FLAME TREE ST E D4 1,519 36 56,564 4/14/22 85 84 16 0 Surface Treatment - Slurry Seal 5/26/01 345 10311 LA GRANDE CIR BAY ST EAST END E C5 340 33 14,280 4/25/22 85 100 0 0 Overlay - AC Structural 6/1/10 347 10312 LA HACIENDA AVE SAN MATEO ST SAN BRUNO ST E E4 690 36 26,720 3/29/22 85 100 0 0 Overlay - AC Structural 8/1/09 347 10313 LA HACIENDA AVE BROOKHURST ST SAN MATEO ST E E4 789 36 28,404 3/29/22 85 99 0 1 Overlay - AC Structural 8/1/09 350 10316 LA LINDA AVE MAGNOLIA ST EAST END E C5 546 36 22,716 4/29/22 85 71 29 0 Overlay - AC Structural 6/1/10 361 10327 LA QUINTA CIR SAN RAFAEL ST WEST END E E5 302 33 11,441 3/2/23 85 69 0 31 Surface Treatment - Slurry Seal 7/1/23 371 10337 LA TERRAZA AVE LOS JARDINES EAST LOS AMIGOS CIR E F4 250 36 10,880 3/22/23 85 100 0 0 Overlay - AC Structural 6/1/15 373 10339 LA TORTOLA AVE LOS ALAMOS ST SAN CLEMENTE ST E E5 259 36 11,124 3/2/23 85 58 31 11 Overlay - AC Structural 6/1/12 400 10364 LOS CANARIOS ST ELLIS AVE BUNTING CIR E E6 1,128 36 41,544 3/7/23 85 83 17 0 Overlay - AC Structural 6/1/12 412 10375 LOS PESOS CIR GOLDENEYE AVE SOUTH END E F5 370 33 13,685 3/2/23 85 100 0 0 Overlay - AC Structural 6/1/15 413 10376 LOS PINTOS CIR LA BATISTA AVE WEST END E F4 396 36 19,491 3/22/23 85 100 0 0 Overlay - AC Structural 6/1/15 508 10466 MT HOFFMAN CIR CORIENDER AVE NORTH END E G3 383 33 14,114 4/26/21 85 76 0 24 Overlay - AC Structural 6/1/16 534 10492 MT STEWART CIR ELLIS AVE NORTH END E C6 1,481 36 55,116 4/21/22 85 83 17 0 Surface Treatment - Slurry Seal 7/1/23 561 10516 OAK CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 85 100 0 0 Overlay - AC Structural 6/13/08 619 10571 PRUNUS ST TANAGER AVE SISKIN AVE E C7 751 36 27,972 4/21/22 85 100 0 0 Surface Treatment - Slurry Seal 7/1/23 634 10584 REDEYE CIR SAN RAFAEL ST EAST END E E5 234 33 9,197 3/2/23 85 69 0 31 Surface Treatment - Slurry Seal 7/1/23 670 10617 SAN CANDELO ST EL CID AVE SAN LEON AVE E F5 1,157 36 45,412 3/22/23 85 77 23 0 Overlay - AC Structural 6/1/15 693 10638 SAN PACO CIR WEST END EAST END E F5 485 33 18,955 3/22/23 85 100 0 0 Overlay - AC Structural 6/1/15 713 10657 SANTA CARLOTTA ST ELLIS AVE MACKENZIE RIVER AVE E B6 1,298 36 50,578 4/25/22 85 74 26 0 Overlay - AC Structural 7/1/11 717 10660 SANTA CATHERINE ST GARFIELD AVE SWALLOW AVE E B7 670 36 24,120 4/6/22 85 84 16 0 Overlay - AC Structural 7/1/11 7001 10829 SANTA ISADORA CIR SOUTH END WOODPECKER AVE E B7 272 33 10,496 4/1/22 85 80 20 0 Overlay - AC Structural 7/1/11 732 10675 SANTA ISADORA ST WOODPECKER AVE ELLIS AVE E B7 2,301 36 86,296 4/1/22 85 80 20 0 Overlay - AC Structural 7/1/11 757 10701 SANTA VALERA ST LA ROCA AVE SALMON AVE E B5 608 36 21,888 4/29/22 85 75 25 0 Overlay - AC Structural 7/1/11 773 10717 SHRIKE AVE DATE ST DEODAR ST E C7 731 36 28,188 4/21/22 85 100 0 0 Surface Treatment - Slurry Seal 7/1/23 793 10731 SPRUCE CIR ROSE AVE NORTH END E D3 405 33 14,840 4/22/21 85 100 0 0 Surface Treatment - Slurry Seal 9/1/22 974 10930 STAEDLER ST EL SILBIDO AVE STAEDLER CIR E F4 250 36 9,000 3/22/23 85 100 0 0 Overlay - AC Structural 6/1/15 802 10740 STONECRESS AVE EUCLID ST MT. SHELLY CIR E G3 2,726 36 100,016 4/26/24 85 85 14 1 Overlay - AC Structural 6/1/16 864 10799 WARBLER AVE DATE ST CAPENSE ST E C7 960 36 36,432 4/21/22 85 87 13 0 Surface Treatment - Slurry Seal 7/1/23 867 10801 WARNER FRONTAGE #1 GREENLEAF ST WEST END E D4 480 27 15,172 4/14/22 85 100 0 0 New Construction - Initial 1/1/80 886 10819 WINTERBERRY ST LA CRESCENTA AVE NORTH END E C5 501 33 16,533 4/29/22 85 73 27 0 Overlay - AC Structural 6/1/10 548 10504 MYRTLEWOOD ST HEATHER AVE JASMINE AVE E C2 980 36 35,280 4/22/24 85 42 56 2 Surface Treatment - Slurry Seal 5/31/01 224 10197 EVEREST ST HEIL AVE AZALEA AVE E H2 192 36 6,912 4/26/24 85 61 0 39 Overlay - AC Structural 8/31/18 529 10487 MT OLSEN CIR SUDITH AVE NORTH END E G3 324 33 12,167 4/25/24 85 100 0 0 Overlay - AC Structural 6/1/16 33 10027 BANANA ST SHAMROCK AVE MISTLETOE AVE E D2 406 36 18,376 4/26/24 85 100 0 0 Surface Treatment - Slurry Seal 12/1/21 215 10188 ELLIS FRONTAGE #4 JACARANDA ST EAST END E D6 482 26 13,417 4/25/24 85 100 0 0 Surface Treatment - Slurry Seal 7/1/23 285 10254 HOLLY AVE SAN GABRIEL ST SHASTA ST E H2 290 33 9,570 4/23/24 85 100 0 0 Overlay - AC Structural 8/31/18 457 10415 MISTLETOE AVE REDWOOD ST BANANA ST E D2 519 36 20,564 4/26/24 85 91 0 9 Surface Treatment - Slurry Seal 12/1/21 483 10441 MT CITADEL ST SUDITH AVE MCCABE RIVER AVE E G3 615 36 22,640 4/22/24 85 100 0 0 Overlay - AC Structural 6/1/16 541 10499 MT WHITNEY ST CAMELLIA AVE SUDITH AVE E G3 257 33 8,981 4/22/24 85 98 0 2 Overlay - AC Structural 6/1/16 824 10760 TAMARIND ST ELLIS AVE TOUCAN CIR E C7 1,161 36 41,796 4/23/24 85 100 0 0 Surface Treatment - Slurry Seal 7/1/23 678 10623 SAN FELIPE ST ORIOLE AVE FALCON AVE E E7 1,090 36 41,112 4/24/24 86 77 23 0 Overlay - AC Structural 6/13/08 138 10118 DANDELION AVE SYCAMORE ST SHADBUSH ST E D2 611 36 21,996 4/22/24 86 100 0 0 Surface Treatment - Slurry Seal 12/1/21 94 10079 CARIBOU ST THYME AVE HONEYSUCKLE AVE E C2 962 36 34,632 4/22/24 86 44 51 5 Surface Treatment - Slurry Seal 5/25/01 630 10580 RAVEN CIR WEST END BIRCH ST E D6 438 32 15,272 4/25/24 86 84 16 0 Surface Treatment - Slurry Seal 7/1/23 2 10001 ACACIA ST GARFIELD AVE SWALLOW AVE E C7 616 36 23,112 4/22/22 86 85 15 0 New Construction - Initial 1/1/80 11 10010 ANGEL AVE LOS JARDINES WEST MEAD ST E F5 618 36 22,998 3/2/23 86 92 0 8 Overlay - AC Structural 8/30/19 53 10045 BLUEBELL AVE MT. HICKS ST WASHBURN ST E G2 940 36 33,840 4/27/21 86 40 0 60 Overlay - AC Structural 6/1/17 935 10891 BRYCE CT ADOBE RIVER AVE FALL RIVER CT E E6 271 22 5,962 3/7/23 86 28 72 0 Overlay - AC Structural 6/1/12 106 10091 CHESTNUT ST EL PUEBLO AVE EL VALLE AVE E C5 587 36 23,232 4/22/22 86 64 36 0 Overlay - AC Structural 6/1/10 107 10092 CHINOOK AVE MEAD ST LOS JARDINES WEST E F5 590 36 21,990 3/2/23 86 100 0 0 Overlay - AC Structural 6/1/15 110 10095 CIRCULO DE VILLA WARD ST WEST END E E4 619 32 21,373 3/14/23 86 83 0 17 Overlay - AC Structural 6/22/12 144 10123 DEODAR ST SHRIKE AVE TANAGER ST E C7 1,300 36 47,736 4/21/22 86 100 0 0 Surface Treatment - Slurry Seal 7/1/23 163 10140 EL CAMPO AVE LOS JARDINES WEST LOS ARCOS ST E F5 651 36 25,316 3/2/23 86 100 0 0 Overlay - AC Structural 6/1/15 176 10153 EL DOMINO AVE LOS JARDINES EAST SAN PEDRO CIR E F4 521 36 20,636 3/22/23 86 62 38 0 Overlay - AC Structural 6/1/15 189 10166 EL MORRO CIR LOS JARDINES WEST EAST END E F4 313 36 13,002 3/22/23 86 100 0 0 Overlay - AC Structural 6/1/15

Page 11 of 20 ends
Page 99 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 196 10173 EL REY AVE BUSHARD ST EL REY CIR E D4 517 36 30,672 4/21/21 86 98 0 2 Surface Treatment - Slurry Seal 5/25/01 207 10181 EL TORO AVE LOS JARDINES WEST SAN FABIAN ST E F5 627 36 24,452 3/2/23 86 96 0 4 Overlay - AC Structural 6/1/15 266 10236 GROUSE AVE DEODAR ST CAPENSE ST E C7 230 36 9,216 4/21/22 86 86 14 0 Surface Treatment - Slurry Seal 7/1/23 344 10310 LA GRANADA AVE BUTTONWOOD ST GREENLEAF ST E D4 757 36 27,252 4/14/22 86 100 0 0 Surface Treatment - Slurry Seal 5/26/01 351 10317 LA LUNA AVE PALM ST WALNUT ST E C4 971 36 34,956 3/8/23 86 100 0 0 Surface Treatment - Slurry Seal 5/26/01 369 10335 LA TEHAMA CIR LOS JARDINES WEST EAST END E F4 374 36 15,198 3/22/23 86 100 0 0 Overlay - AC Structural 6/1/15 11001 10994 LILY AVE BAYBERRY ST CDS E C3 602 36 21,672 3/6/23 86 58 42 0 New Construction - Initial 1/1/80 397 10363 LOS AMIGOS CIR LA TERRAZA AVE WEST END E F4 443 36 19,303 3/22/23 86 100 0 0 Overlay - AC Structural 6/1/15 907 10862 LOS JARDINES WEST LOS JARDINES EAST SLATER AVE E F4 2,120 36 76,320 4/7/22 86 60 0 40 Overlay - AC Structural 8/1/09 419 10382 LOS VASOS ST TALBERT AVE EL ESTE AVE E F5 510 36 20,240 3/2/23 86 100 0 0 Overlay - AC Structural 6/1/15 469 10427 MORONGO ST SANTA ISADORA ST TOMAHAWK ST E B7 1,484 36 53,424 4/1/22 86 84 16 0 Overlay - AC Structural 7/1/11 542 10500 MT WYNNE CIR YOUNG RIVER AVE NORTH END I G4 330 42 15,280 4/26/21 86 97 0 3 Overlay - AC Structural 8/1/09 560 10515 NILE RIVER AVE SANTA BELINDA CIR MAGNOLIA ST E B6 175 36 6,300 4/25/22 86 83 17 0 Overlay - AC Structural 7/1/11 595 10549 PEPPER TREE ST EL SOL AVE LA ESTRELLA AVE E C4 523 36 21,248 3/8/23 86 100 0 0 Surface Treatment - Slurry Seal 5/31/01 610 10563 PLACER RIVER AVE MONTICITO ST STANISLAUS ST E E6 245 36 8,820 3/7/23 86 83 17 0 Overlay - AC Structural 6/1/12 614 10567 POPLAR ST LA LUNA AVE LA ESTRELLA AVE E C4 726 36 28,556 3/8/23 86 100 0 0 Surface Treatment - Slurry Seal 5/31/01 669 10616 SAN BRUNO ST LA HACIENDA AVE WARNER AVE E E4 645 36 25,100 3/29/22 86 100 0 0 Overlay - AC Structural 8/1/09 676 10622 SAN FABIAN ST EL ADELANTE AVE EL TORO AVE E F5 250 36 12,760 3/2/23 86 52 45 3 Overlay - AC Structural 6/1/15 691 10636 SAN MATEO ST WARNER AVE SLATER AVE E E4 2,658 36 95,688 4/21/21 86 75 0 25 Overlay - AC Structural 8/1/09 695 10640 SAN PEDRO CIR EL DOMINO AVE NORTH END E F4 270 36 13,075 3/22/23 86 100 0 0 Overlay - AC Structural 6/1/15 1001 10958 SANTA ELENA CIR EL CAPITAN AVE END E B5 421 33 17,493 4/28/22 86 83 17 0 Overlay - AC Structural 7/1/11 1002 10986 SANTA ELENA ST EL PRESIDENTE AVE EL CAPITAN AVE E C5 583 36 20,988 4/28/22 86 76 24 0 Overlay - AC Structural 7/1/10 746 10690 SANTA OLIVIA ST TALBERT AVE SWORDFISH AVE E B5 511 36 18,396 4/29/22 86 75 25 0 Overlay - AC Structural 7/1/11 798 10737 STARFISH AVE BANYAN ST SLATER AVE E D4 898 28 26,734 4/21/21 86 88 12 0 Surface Treatment - Slurry Seal 6/1/01 836 10772 THRUSH AVE SAN ANTONIO ST WARD ST E E7 527 36 18,972 4/24/24 86 96 0 4 Overlay - AC Structural 6/13/08 844 10779 TOUCAN AVE COLVILLE ST BUSHARD ST E C6 1,110 36 40,896 4/21/22 86 86 14 0 Surface Treatment - Slurry Seal 7/1/23 294 10261 IRIS AVE SAN JACINTO ST EDINGER AVE E H2 302 36 10,872 4/23/24 86 100 0 0 Overlay - AC Structural 8/31/18 850 10785 TURTLEDOVE AVE BRIAR ST LEMON ST E D6 972 36 35,928 4/24/24 86 100 0 0 Surface Treatment - Slurry Seal 7/1/23 134 10114 DAFFODIL AVE PONDEROSA ST SCOTCH PINE ST E C2 1,000 36 36,000 4/22/24 86 83 17 0 Surface Treatment - Slurry Seal 5/25/01 822 10759 TALBERT FRONTAGE #2 BRIAR ST LEMON ST E D6 997 27 26,919 4/24/24 86 100 0 0 Surface Treatment - Slurry Seal 7/1/23 139 10119 DANDELION CIR SHADBUSH ST EAST END E D2 382 33 14,081 4/26/24 86 94 0 6 Surface Treatment - Slurry Seal 12/1/21 250 10221 GEODE AVE MT. HUTCHINGS ST MT. MILLS ST E H3 322 33 10,626 4/22/24 86 92 0 8 Overlay - AC Structural 8/30/19 787 10727 SORREL ST SHAMROCK AVE MESQUITE ST E D2 383 36 13,788 4/22/24 86 100 0 0 Surface Treatment - Slurry Seal 12/1/21 793 10733 SPRUCE CIR MARIGOLD AVE NORTH END E D2 98 36 5,003 4/22/24 87 100 0 0 Surface Treatment - Slurry Seal 12/1/21 818 10755 SYCAMORE ST HEIL AVE HIBISCUS AVE E D2 1,680 36 60,480 4/22/24 87 100 0 0 Surface Treatment - Slurry Seal 12/1/21 437 10397 MARKHAM ST DOGWOOD AVE WISTERIA AVE E H3 990 36 35,640 4/22/24 87 100 0 0 Overlay - AC Structural 8/30/19 251 10222 GERANIUM AVE ROSEWOOD ST MAHOGANY ST E C2 301 36 10,836 4/22/24 87 70 30 0 Surface Treatment - Slurry Seal 5/25/01 454 10412 MESQUITE CIR SORREL ST NORTH END E D2 173 33 7,184 4/22/24 87 57 43 0 Surface Treatment - Slurry Seal 12/1/21 509 10467 MT HOPE ST WARNER AVE SANDSTONE AVE E G3 594 36 21,384 4/25/24 87 73 0 27 Overlay - AC Structural 6/1/16 656 10603 RUE CIR MISTLETOE AVE NORTH END E D2 160 33 6,755 4/26/24 87 100 0 0 Surface Treatment - Slurry Seal 12/1/21 299 10267 JASMINE AVE SCOTCH PINE ST MAHOGANY ST E C2 1,197 36 43,092 4/22/24 87 95 0 5 Surface Treatment - Slurry Seal 5/26/01 491 10449 MT DARWIN CIR STONECRESS AVE NORTH END E G3 403 33 14,774 4/25/24 87 82 18 0 Overlay - AC Structural 6/1/16 762 10706 SCOTCH PINE ST BUTTERCUP AVE HONEYSUCKLE AVE E C2 1,273 36 49,588 4/22/24 87 95 0 5 Surface Treatment - Slurry Seal 5/31/01 300 10268 JASMINE CIR MAHOGANY ST EAST END E C2 176 33 7,283 4/22/24 87 100 0 0 Surface Treatment - Slurry Seal 5/26/02 1 10000 ABAJO CIR CALENDULA AVE NORTH END E J2 330 33 14,245 3/6/23 87 100 0 0 Overlay - AC Structural 8/30/19 16 10015 APRICOT CIR EL TAMBOR AVE NORTH END E D4 240 33 19,590 4/14/22 87 100 0 0 Surface Treatment - Slurry Seal 5/25/01 37 10031 BASSWOOD ST RHEA AVE TOUCAN CIR E D6 961 36 35,532 4/23/24 87 100 0 0 Surface Treatment - Slurry Seal 7/1/23 62 10052 BUNTING AVE LOS CANARIOS ST MT. WATERMAN ST E E6 607 36 22,788 3/7/23 87 85 0 15 Overlay - AC Structural 6/1/12 97 10082 CARNATION CIR SIERRA ST EAST END E H2 410 33 15,005 4/23/24 87 98 0 2 Overlay - AC Structural 8/31/18 117 10100 COLUMBINE AVE PONDEROSA ST SCOTCH PINE ST E C2 1,000 36 36,000 4/22/24 87 85 0 15 Surface Treatment - Slurry Seal 5/25/01 172 10150 EL CORAZON AVE BROOKHURST ST EAST END E E4 478 36 18,683 3/29/22 87 94 0 6 Overlay - AC Structural 8/1/09 9005 10846 EL DURANGO CIR ORANGE ST EAST END E D4 406 33 14,873 4/14/22 87 67 0 33 Surface Treatment - Slurry Seal 5/25/01 199 10175 EL RUBI CIR LOS JARDINES WEST SOUTHEAST END E F4 298 36 12,462 3/22/23 87 100 0 0 Overlay - AC Structural 6/1/15 203 10178 EL SONETO AVE LOS JARDINES WEST SAN JULIAN ST E F5 368 36 15,128 3/2/23 87 99 0 1 Overlay - AC Structural 6/1/15 253 10224 GIFFORD ST WATT RIVER AVE TOUCAN AVE E C6 960 36 35,496 4/21/22 87 100 0 0 Surface Treatment - Slurry Seal 7/1/23 303 10959 JUNIPER ST EL COLORADO AVE SLATER AVE E C5 177 36 6,372 4/29/22 87 100 0 0 Overlay - AC Structural 6/1/10

Page 12 of 20 ends
Page 100 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 367 10332 LA STELLA AVE MAGNOLIA ST PALM ST E C4 200 36 7,200 3/8/23 87 100 0 0 Surface Treatment - Slurry Seal 5/26/01 375 10341 LA ZAPATILLA CIR NECTARINE ST WEST END E D4 411 33 15,038 4/14/22 87 89 0 11 Surface Treatment - Slurry Seal 5/26/01 395 10361 LOS ALAMOS ST LA DESPENSA AVE SLATER AVE E E5 2,566 36 94,256 3/2/23 87 52 0 48 Surface Treatment - Slurry Seal 7/1/23 406 10369 LOS JARDINES EAST SACUILLO ST SLATER AVE E F5 2,270 36 81,720 4/7/22 87 100 0 0 Overlay - AC Structural 8/1/09 416 10379 LOS ROBLES CIR EL DOMINO AVE NORTH END E F4 269 36 11,159 3/22/23 87 100 0 0 Overlay - AC Structural 6/1/15 473 10431 MT ALLYSON CIR CORIENDER AVE NORTH END E G3 461 33 16,688 4/26/21 87 100 0 0 Overlay - AC Structural 6/1/16 488 10446 MT COULTER ST TALBERT AVE HAMILTON AVE E D5 456 36 17,352 4/21/21 87 100 0 0 Surface Treatment - Slurry Seal 5/31/01 498 10456 MT FLETCHER CIR SUDITH AVE NORTH END E G3 321 33 12,568 4/25/24 87 100 0 0 Overlay - AC Structural 6/1/16 533 10491 MT SHELLY CIR STONECRESS AVE NORTH END E G3 370 33 15,565 4/26/21 87 70 19 11 Overlay - AC Structural 6/1/16 546 10502 MULBERRY CIR DAISY AVE CDS E C3 413 36 16,343 3/6/23 87 94 0 6 Overlay - AC Structural 5/1/08 555 10510 NIEVES ST LOS JARDINES EAST LA FLOR AVE E F5 228 33 9,404 3/22/23 87 100 0 0 Overlay - AC Structural 6/1/15 574 10528 OSCAR CIR FREMONT ST EAST END E D5 475 33 18,187 4/21/21 87 98 0 2 Surface Treatment - Slurry Seal 5/31/01 661 10608 SALMON AVE SANTA VALERIA ST SANTA OLIVIA ST E B5 790 36 30,320 4/29/22 87 84 16 0 Overlay - AC Structural 7/1/11 699 10644 SAN VICENTE ST EL MONTEREY AVE NORTH END E E5 389 33 12,837 3/2/23 87 72 0 28 Surface Treatment - Slurry Seal 7/1/23 717 10661 SANTA CATHERINE ST LA CASITA AVE EL RANCHO AVE E B4 732 36 28,452 3/14/23 87 95 0 5 Overlay - AC Structural 1/1/07 720 10664 SANTA CLARA ST SOUTH END LA PALOMA AVE E B4 1,194 36 42,984 3/8/23 87 55 45 0 Overlay - AC Structural 1/1/07 780 10724 SITKA CIR MT. COULTER ST EAST END E D5 144 42 6,754 4/21/21 87 100 0 0 Surface Treatment - Slurry Seal 5/31/01 1050 10961 SLATER FRONTAGE #2 WEST END EAST END E F4 800 29 25,778 3/22/23 87 100 0 0 Overlay - AC Structural 6/1/15 986 10943 SOLANO RIVER CT ELK RIVER CT STONE RIVER CT E E6 177 22 3,894 3/7/23 87 47 53 0 Overlay - AC Structural 6/22/12 805 10743 SUGARLOAF ST HEIL AVE STONECRESS AVE E G3 1,063 36 38,268 4/26/21 87 91 0 9 Overlay - AC Structural 6/1/16 839 10775 TIN MOUNTAIN CIR SANDSTONE AVE NORTH END E G3 425 36 16,775 4/26/21 87 94 0 6 Overlay - AC Structural 6/1/16 879 10812 WILLOW CIR DAISY AVE CDS E C3 395 36 15,695 3/6/23 87 73 0 27 Overlay - AC Structural 6/13/08 998 10955 YELLOWSTONE CT RIO GRANDE CT TRUCKEE RIVER CT E E6 264 21 5,544 3/7/23 87 100 0 0 Overlay - AC Structural 6/1/12 663 10610 SAN ANDRES ST DOGWOOD AVE LOTUS AVE E H3 710 36 26,060 4/23/24 87 66 0 34 Overlay - AC Structural 8/30/19 520 10478 MT MICHAELIS CIR HEIL AVE SOUTH END E H3 1,176 33 40,283 4/22/24 88 100 0 0 Overlay - AC Structural 8/30/19 287 10256 HONEYSUCKLE AVE SCOTCH PINE ST BUSHARD ST E C2 1,481 36 54,066 4/22/24 88 62 0 38 Surface Treatment - Slurry Seal 5/26/01 380 10346 LASSEN ST WISTERIA AVE HEIL AVE E H3 1,192 36 43,412 4/22/24 88 100 0 0 Overlay - AC Structural 8/30/19 694 10639 SAN PASQUAL ST NIGHTENGALE AVE FALCON AVE E E7 267 36 9,612 4/24/24 88 81 19 0 Overlay - AC Structural 6/13/08 20 10018 ASH ST LA COLONIA AVE LA ESTRELLA AVE E C4 962 36 35,346 3/8/23 88 100 0 0 Surface Treatment - Slurry Seal 5/25/01 46 10039 BIRCH ST ELLIS AVE TOUCAN CIR E D6 1,170 36 42,120 4/24/24 88 100 0 0 Surface Treatment - Slurry Seal 7/1/23 102 10087 CEDAR CIR ROSE AVE NORTH END E D3 405 33 14,840 4/29/22 88 100 0 0 Surface Treatment - Slurry Seal 9/1/22 133 10113 CYPRESS ST TALBERT AVE LA AMAPOLA AVE E D5 499 36 17,964 4/21/21 88 100 0 0 Surface Treatment - Slurry Seal 5/25/01 168 10145 EL CID AVE LOS JARDINES EAST SAN CANDELO ST E F5 394 36 16,064 3/22/23 88 84 16 0 Overlay - AC Structural 6/1/15 252 10223 GERANIUM CIR MAHOGANY ST EAST END E C2 170 33 7,085 4/22/24 88 62 0 38 Surface Treatment - Slurry Seal 5/25/01 9000 10841 GRACE AVE EUCLID ST MT. HERRMANN ST I G5 1,315 46 60,490 4/25/24 88 100 0 0 New Construction - Initial 1/1/80 270 10240 HAMILTON AVE MT. COULTER ST TOIYABE ST E D5 256 36 10,152 4/21/21 88 100 0 0 Surface Treatment - Slurry Seal 5/25/01 340 10306 LA FIESTA AVE SANTA MARIA ST SANTA LUCIA ST E B4 500 36 18,000 3/14/23 88 59 41 0 Surface Treatment - Slurry Seal 6/13/08 377 10343 LOS ARCOS ST EL CAMPO AVE LA ALONDRA AVE E F5 250 36 12,760 3/2/23 88 75 0 25 Overlay - AC Structural 6/1/15 403 10367 LOS ESTADOS ST LA PERLA AVE EL ESTE AVE E F5 312 36 13,112 3/2/23 88 100 0 0 Overlay - AC Structural 6/1/15 449 10409 MEAD ST ANGEL AVE CHINOOK AVE E F5 269 36 10,434 3/2/23 88 100 0 0 Overlay - AC Structural 6/1/15 540 10498 MT WATERMAN ST KINGBIRD AVE BUNTING CIR E E6 1,054 36 35,160 3/7/23 88 80 0 20 Overlay - AC Structural 6/1/12 605 10559 PIKE AVE SAN MATEO ST SAN LUIS ST E E4 308 36 12,968 4/29/22 88 100 0 0 Overlay - AC Structural 8/1/09 666 10613 SAN BAYAS ST SLATER AVE LA MARQUESA AVE E F5 277 36 11,852 3/22/23 88 50 50 0 Overlay - AC Structural 6/1/15 679 10625 SAN FIDEL ST LA DESPENSA AVE LA MARMOTA AVE E E5 259 36 13,084 3/2/23 88 83 0 17 Overlay - AC Structural 6/1/12 687 10632 SAN LORENZO CIR LA CARTA AVE WEST END E F4 405 36 19,815 3/22/23 88 100 0 0 Overlay - AC Structural 6/1/15 692 10637 SAN MINISO CIR SAN LEON AVE NORTH END E F5 151 36 8,791 3/22/23 88 100 0 0 Overlay - AC Structural 6/1/15 945 10900 SAND DUNES CT TRUCKEE RIVER CT ANTELOPE RIVER AVE E E6 266 22 5,852 3/7/23 88 52 48 0 Overlay - AC Structural 6/1/12 737 10681 SANTA LUCIA ST SLATER AVE NORTH END E B4 1,591 36 60,336 3/14/23 88 92 0 8 Overlay - AC Structural 1/1/07 803 10741 STURGEON AVE FREMONT ST TOIYABE ST E D5 643 36 24,084 4/21/21 88 80 20 0 Surface Treatment - Slurry Seal 6/1/01 7012 10840 TOIYABE CIR SOUTH END HAMILTON AVE E D5 243 33 9,275 4/21/21 88 93 0 7 New Construction - Initial 1/1/80 880 10813 WINDSOR AVE MAGNOLIA ST WARWICK CIR E C5 543 36 21,348 4/29/22 88 82 18 0 Overlay - AC Structural 6/1/10 294 10262 IRIS AVE SIERRA ST SAN GABRIEL ST E H2 690 33 24,650 4/23/24 88 100 0 0 Overlay - AC Structural 8/31/18 149 10128 DOGWOOD AVE TERREL ST LASSEN ST E H3 869 36 31,284 4/22/24 88 100 0 0 Overlay - AC Structural 8/30/19 384 10350 LEMON ST TURTLEDOVE AVE TALBERT FRONTAGE RD E D6 528 36 19,008 4/24/24 88 100 0 0 Surface Treatment - Slurry Seal 7/1/23 620 10572 PUFFIN AVE BRIAR ST LEMON ST E D6 998 36 35,928 4/24/24 88 100 0 0 Surface Treatment - Slurry Seal 7/1/23 471 10429 MT ACKERMAN CIR EDINGER AVE SOUTH END E H2 765 33 26,970 4/23/24 89 97 0 3 Overlay - AC Structural 8/31/18

Page 13 of 20 ends
Page 101 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 234 10206 FIR ST TOUCAN CIR NORTH END E D6 150 36 5,400 4/25/24 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 294 10260 IRIS AVE SHASTA ST SAN JACINTO ST E H2 330 36 11,880 4/23/24 89 100 0 0 Overlay - AC Structural 8/31/18 286 10255 HOLLYHOCK AVE MAHOGANY ST BUSHARD ST E C2 282 36 10,152 4/22/24 89 84 0 16 Surface Treatment - Slurry Seal 5/26/01 290 10259 HYACINTH CIR SHAMROCK AVE NORTH END E D2 346 33 12,893 4/22/24 89 100 0 0 Surface Treatment - Slurry Seal 12/1/21 56 10048 BRIAR ST TURTLEDOVE AVE TALBERT AVE E D6 587 36 22,068 4/24/24 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 246 10217 GALLATIN ST THYME AVE HONEYSUCKLE AVE E C2 955 36 36,260 4/22/24 89 100 0 0 Surface Treatment - Slurry Seal 5/25/01 885 10818 WISTERIA AVE TERREL ST LASSEN ST E H3 767 36 28,612 4/22/24 89 69 0 31 Overlay - AC Structural 8/30/19 904 10860 AVENIDA COMPADRES AVENIDA SUENOS END E F4 426 22 9,372 3/22/23 89 64 36 0 Overlay - AC Structural 6/1/15 76 10065 CALENDULA AVE CARLETON ST ABAJO CIR E J2 568 36 24,208 3/6/23 89 100 0 0 Overlay - AC Structural 8/1/19 98 10083 CAROB CIR LIVINGSTONE ST EAST END E G2 285 33 10,880 4/27/21 89 100 0 0 Overlay - AC Structural 6/1/17 123 10106 CORIENDER AVE GLASS MOUNTAIN ST NEWHOPE ST E G3 1,037 36 38,912 4/26/21 89 97 0 3 Overlay - AC Structural 6/1/16 172 10149 EL CORAZON AVE SAN MATEO ST SAN LUIS ST E E4 254 36 11,024 4/1/22 89 100 0 0 Overlay - AC Structural 8/1/09 178 10155 EL GORRA CIR LOS JARDINES WEST EAST END E F4 378 36 15,342 3/22/23 89 100 0 0 Overlay - AC Structural 6/1/15 179 10156 EL GRECO CIR NECTARINE ST WEST END E D4 406 33 14,873 4/14/22 89 61 0 39 Surface Treatment - Slurry Seal 5/25/01 183 10160 EL MAR AVE SACUILLO ST LOS JARDINES EAST E F5 832 36 31,832 3/22/23 89 100 0 0 Overlay - AC Structural 6/1/15 218 10191 ELM ST LA COLONIA AVE LA ESTRELLA AVE E C4 962 36 34,632 3/8/23 89 100 0 0 Surface Treatment - Slurry Seal 5/25/01 943 10899 FIRESTONE CT ANTELOPE RIVER AVE TRUCKEE RIVER CT E E6 392 22 8,624 3/7/23 89 30 70 0 Overlay - AC Structural 6/1/12 236 10207 FLAME TREE CIR LA ALAMEDA AVE SOUTH END E D4 583 33 19,239 4/14/22 89 92 0 8 Surface Treatment - Slurry Seal 5/25/01 264 10234 GREENLEAF ST WARNER AVE LA ESPERANZA AVE E D4 663 36 23,868 4/14/22 89 100 0 0 Surface Treatment - Slurry Seal 5/25/01 269 10239 GUM CIR EL PORTAL CIR SOUTH END E D4 54 74 5,471 4/21/21 89 100 0 0 Surface Treatment - Slurry Seal 5/25/01 7003 10831 JAY AVE MAGNOLIA ST PALM ST E C7 191 36 6,876 4/22/22 89 100 0 0 New Construction - Initial 1/1/80 313 10279 KONIGSMARK ST TALBERT AVE LA AMAPOLA AVE E D5 487 36 17,532 4/21/21 89 82 18 0 New Construction - Initial 1/1/80 319 10285 LA BAHIA AVE LOS JARDINES WEST SAN JULIAN ST E F5 400 36 16,280 3/2/23 89 88 0 12 Overlay - AC Structural 6/1/15 327 10293 LA CASITA AVE SANTA CATHERINE ST SANTA MADRINA ST E B4 320 36 11,520 3/14/23 89 35 0 65 Overlay - AC Structural 1/1/07 336 10302 LA ESPERANZA AVE SPARKLEBERRY ST NECTARINE ST E D4 1,074 36 39,639 4/14/22 89 80 0 20 Surface Treatment - Slurry Seal 5/26/01 343 10309 LA FUENTE ST LA ROSA LN LOS JARDINES WEST E F5 211 28 6,658 3/22/23 89 100 0 0 Overlay - AC Structural 6/1/15 356 10324 LA PALOMA AVE WALNUT ST OAK ST E C4 279 36 10,044 3/8/23 89 100 0 0 Surface Treatment - Slurry Seal 5/26/01 367 10333 LA STELLA AVE MAGNOLIA ST SANTA CLARA ST E B4 508 36 18,288 3/8/23 89 100 0 0 Overlay - AC Structural 1/1/07 382 10348 LAVENDER AVE EUCLID ST SUGARLOAF ST E G3 1,170 36 42,120 4/26/21 89 100 0 0 Overlay - AC Structural 6/1/16 911 10868 LILAC AVE HARBOR BLVD CITY LIMIT E I2 1,322 36 47,592 3/6/23 89 35 0 65 Overlay - AC Structural 8/30/19 402 10366 LOS ENCINOS ST LA TERRAZA AVE EL CENTRO AVE E F4 260 36 13,120 3/22/23 89 100 0 0 Overlay - AC Structural 6/1/15 414 10377 LOS PRADOS ST GOLDENEYE AVE SOUTH END E F5 410 36 15,420 3/2/23 89 98 0 2 Overlay - AC Structural 6/1/15 431 10391 MAPLE ST DAISY AVE POINSETTIA AVE E C3 1,073 36 38,628 3/6/23 89 82 0 18 Surface Treatment - Slurry Seal 6/13/08 463 10421 MONTECITO ST ELLIS AVE PLACER RIVER AVE E E6 152 36 5,472 3/7/23 89 52 48 0 Overlay - AC Structural 6/22/12 559 10514 NIGHTHAWK CIR LOS PRADOS ST EAST END E F5 183 33 7,514 3/2/23 89 100 0 0 Overlay - AC Structural 6/1/15 583 10537 PALM ST LA COLONIA AVE NORTH END E C4 1,035 36 39,680 3/8/23 89 100 0 0 Surface Treatment - Slurry Seal 5/31/01 942 10898 POWDERHORN RIVER CT GLACIER CT KINGS CANYON ST E E6 256 22 5,632 3/7/23 89 74 26 0 Overlay - AC Structural 6/1/12 688 10633 SAN LUIS ST EL CORAZON AVE PIKE AVE E E4 682 36 28,312 4/29/22 89 100 0 0 Overlay - AC Structural 8/1/09 703 10648 SANDSTONE AVE MT. EDEN CIR NEWHOPE ST E G3 510 36 18,360 4/26/21 89 71 23 6 Overlay - AC Structural 6/1/16 728 10672 SANTA GERTRUDES CIR LA ROCA AVE NORTH END E B5 373 33 12,540 4/29/22 89 81 19 0 Overlay - AC Structural 7/1/11 1051 10960 SLATER FRONTAGE #3 WEST END EAST END E F4 315 29 11,713 3/22/23 89 100 0 0 Overlay - AC Structural 6/1/15 9007 10848 SLATER FRONTAGE #4 LOS JARDINES EAST FR EAST END E F5 350 26 9,850 3/22/23 89 75 0 25 Overlay - AC Structural 6/1/15 845 10781 TRADEWINDS ST SLATER AVE AMBERWOOD CIR E E5 210 32 6,720 3/2/23 89 44 0 56 Surface Treatment - Slurry Seal 7/1/23 871 10805 WATT RIVER AVE COLVILLE ST GIFFORD ST E C6 294 36 11,520 4/21/22 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 640 10589 RHEA AVE BASSWOOD ST TAMARIND ST E D6 310 36 11,160 4/25/24 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 681 10627 SAN GABRIEL ST IRIS AVE POPPY AVE E H2 900 33 33,460 4/23/24 89 100 0 0 Overlay - AC Structural 8/31/18 814 10751 SWAN CIR JACARANDA ST EAST END E D6 424 32 14,824 4/25/24 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 589 10543 PEACOCK CIR JACARANDA ST EAST END E D6 423 32 14,792 4/25/24 89 100 0 0 Surface Treatment - Slurry Seal 7/1/23 613 10566 PONDEROSA ST FOXGLOVE AVE BUTTERCUP AVE E C2 766 36 29,456 4/22/24 89 58 0 42 Surface Treatment - Slurry Seal 5/31/01 547 10503 MULLEIN CIR SHAMROCK AVE NORTH END E D2 372 33 13,751 4/22/24 89 100 0 0 Surface Treatment - Slurry Seal 12/1/21 7007 10835 NIGHTINGALE CIR SAN ANTONIO ST EAST END E E7 470 32 16,359 4/24/24 89 49 51 0 Surface Treatment - Slurry Seal 6/13/08 296 10264 JACARANDA ST ELLIS AVE TOUCAN CIR E D6 1,176 36 42,336 4/25/24 89 62 38 0 Surface Treatment - Slurry Seal 7/1/23 972 10927 LOTUS AVE SAN ANDRES ST LASSEN ST E H3 244 32 8,308 4/23/24 90 100 0 0 Overlay - AC Structural 8/30/19 592 10546 PENGUIN AVE MT. MICHAELIS CIR HARBOR BLVD E H3 180 31 5,580 4/22/24 90 100 0 0 Overlay - AC Structural 8/30/19 837 10773 THYME AVE CACHE ST GALLATIN ST E C2 750 36 30,760 4/22/24 90 100 0 0 New Construction - Initial 1/1/80 543 10501 MT YOUNIS ST QUARTZ AVE TANNAS AVE I H3 582 36 21,452 4/22/24 90 31 0 69 Overlay - AC Structural 8/30/19

Page 14 of 20 ends
Page 102 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 556 10512 NIGHTINGALE AVE BUSHARD ST REDWOOD CIR E D7 1,133 36 40,788 4/23/24 90 71 25 4 Overlay - AC Structural 8/1/20 376 10342 LARK CIR WEST END BIRCH ST E D6 440 36 17,096 4/25/24 90 47 53 0 Surface Treatment - Slurry Seal 7/1/23 170 10147 EL COCO CIR SAN CANDELO ST WEST END E F5 252 33 9,791 3/22/23 90 100 0 0 Overlay - AC Structural 6/1/15 217 10190 ELM CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 90 88 0 12 Overlay - AC Structural 5/1/08 242 10213 FOSTER ST PHILLIPS AVE TALBERT AVE E D6 1,485 32 48,456 3/7/23 90 100 0 0 Overlay - AC Structural 8/1/09 303 10271 JUNIPER ST LA PALOMA AVE EL CORTEZ AVE E C4 443 36 15,948 3/8/23 90 100 0 0 Surface Treatment - Slurry Seal 5/26/01 327 10295 LA CASITA AVE PALM ST WALNUT ST E C4 971 36 34,956 3/8/23 90 100 0 0 New Construction - Initial 1/1/80 337 10303 LA ESTRELLA AVE SANTA LUCIA ST SANTA SUZANNE ST E B4 300 36 10,800 3/14/23 90 100 0 0 Surface Treatment - Slurry Seal 6/13/08 337 10305 LA ESTRELLA AVE OAK ST POPLAR ST E C4 945 36 36,440 3/8/23 90 100 0 0 Surface Treatment - Slurry Seal 5/26/01 351 10318 LA LUNA AVE ASH ST BUSHARD ST E C4 619 36 22,284 3/8/23 90 100 0 0 Surface Treatment - Slurry Seal 5/26/01 353 10319 LA MARMOTA AVE SAN FIDEL ST WARD ST E E5 165 36 7,820 3/2/23 90 75 0 25 Overlay - AC Structural 6/1/12 354 10320 LA MARQUESA AVE SAN BAYAS ST LOS JARDINES EAST E F5 760 36 29,240 3/22/23 90 92 0 8 Overlay - AC Structural 6/1/15 356 10323 LA PALOMA AVE MAGNOLIA ST WALNUT ST E C4 1,171 36 42,156 3/8/23 90 100 0 0 Surface Treatment - Slurry Seal 5/26/01 385 10351 LEHNHARDT AVE LOS REYES ST CITY LIMIT E F1 515 36 20,420 3/6/23 90 100 0 0 Overlay - AC Structural 8/1/20 9006 10847 LOS JARDINES EAST FR SLATER FRONTAGE #4 SOUTH END E F5 300 26 8,550 3/22/23 90 100 0 0 Overlay - AC Structural 6/1/15 417 10380 LOS SANTOS ST LA BATISTA AVE EL PASO AVE E F4 272 36 13,552 3/22/23 90 100 0 0 Overlay - AC Structural 6/1/15 987 10944 MESA VERDE CT ADOBE RIVER AVE END E E6 236 22 5,192 3/7/23 90 90 10 0 Overlay - AC Structural 6/1/12 9012 10997 MIMOSA CIR LOMBARDI AVE CDS E 261 36 9,396 3/8/23 90 100 0 0 New Construction - AC 1/1/10 460 10418 MODOC ST EL REY AVE NORTH EAST END E D4 368 36 13,248 4/21/21 90 100 0 0 Surface Treatment - Slurry Seal 5/31/01 583 10538 PALM ST LA CASITA AVE LA PALOMA AVE E C4 260 36 11,780 3/8/23 90 100 0 0 Surface Treatment - Slurry Seal 5/31/01 612 10990 POINSETTIA AVE AVOCADO ST BAYBERRY ST E C3 716 36 25,776 3/6/23 90 53 0 47 New Construction - Initial 1/1/80 657 10604 RUSHMORE ST BEGONIA AVE LAVENDER AVE E G3 310 36 13,040 4/26/21 90 100 0 0 Overlay - AC Structural 6/1/16 685 10630 SAN JULIAN ST EL SONETO AVE LA BAHIA AVE E F5 250 36 12,760 3/2/23 90 100 0 0 Overlay - AC Structural 6/1/15 711 10654 SANTA BARBARA ST SWALLOW AVE NIGHTINGALE AVE E B7 524 36 19,800 4/1/22 90 100 0 0 Overlay - AC Structural 7/1/11 810 10747 SUZETTE RIVER CIR NEWHOPE ST WEST END E H2 293 33 11,144 4/27/21 90 97 0 3 Overlay - AC Structural 6/1/17 825 10761 TANAGER AVE PLUMOSA ST BUSHARD ST E C7 1,135 36 42,708 4/21/22 90 96 0 4 Surface Treatment - Slurry Seal 7/1/23 827 10763 TEAK CIR GARDENIA AVE CDS E C3 410 36 16,235 3/6/23 90 100 0 0 Overlay - AC Structural 5/1/08 860 10798 WALNUT ST EL MORADO AVE EL COLORADO AVE E C5 990 36 39,840 4/29/22 90 73 22 5 Overlay - AC Structural 6/1/10 870 10804 WATERTON ST ANGEL AVE CHINOOK AVE E F5 409 33 13,497 3/2/23 90 77 0 23 Overlay - AC Structural 6/1/15 874 10808 WENDY CIR DAISY AVE CDS E C3 214 33 8,537 3/6/23 90 100 0 0 Overlay - AC Structural 6/13/08 962 10917 YOSEMITE CT DURANGO RIVER CT END E E6 261 22 5,742 3/7/23 90 92 8 0 Overlay - AC Structural 6/1/12 682 10628 SAN JACINTO CIR IRIS AVE NORTH END E H2 289 33 11,012 4/23/24 90 97 0 3 Overlay - AC Structural 8/31/18 74 10063 CACHE ST HONEYSUCKLE AVE THYME AVE E C2 974 36 36,944 4/22/24 90 100 0 0 Surface Treatment - Slurry Seal 5/25/01 683 10629 SAN JACINTO ST AZALEA AVE IRIS AVE E H2 1,147 36 41,292 4/23/24 90 100 0 0 Overlay - AC Structural 8/31/18 700 10645 SANDALWOOD ST HEIL AVE JASMINE AVE E C2 1,170 36 42,120 4/22/24 90 56 0 44 Surface Treatment - Slurry Seal 5/31/01 440 10400 MAYFLOWER CIR SAN JACINTO ST EAST END E H2 516 33 20,788 4/23/24 91 97 0 3 Overlay - AC Structural 8/31/18 104 10089 CHALLIS ST THYME AVE JOJOBA AVE E C2 710 36 27,440 4/22/24 91 100 0 0 Surface Treatment - Slurry Seal 5/25/01 285 10842 HOLLY AVE NEWHOPE ST SIERRA ST E H2 190 36 6,840 4/23/24 91 73 0 27 Overlay - AC Structural 8/31/18 831 10767 TERREL ST HEIL AVE WISTERIA AVE E H3 1,180 36 42,980 4/22/24 91 91 0 9 Overlay - AC Structural 8/30/19 214 10187 ELLIS FRONTAGE #3 BIRCH ST WEST END E D6 500 26 14,006 4/24/24 91 64 30 6 Surface Treatment - Slurry Seal 7/1/23 621 10573 PURSLANE CIR MT. YOUNIS ST EAST END E H3 274 32 10,243 4/22/24 91 88 0 12 Overlay - AC Structural 8/30/19 9009 10999 ANDALUSIA AVE OAK ST CDS E 863 36 31,068 3/8/23 91 88 0 12 New Construction - AC 1/1/10 28 10023 AVOCADO ST POINSETTIA AVE GARDENIA AVE E C3 300 36 10,800 3/6/23 91 100 0 0 Surface Treatment - Slurry Seal 6/17/08 926 10882 BERG RIVER CIR END MT. GUSTIN ST E J2 445 32 16,040 3/6/23 91 100 0 0 Overlay - AC Structural 8/30/19 52 10044 BLUE ALLIUM AVE EUCLID ST MT. EMMA ST E G2 938 36 35,648 4/27/21 91 45 0 55 Overlay - AC Structural 6/1/17 905 10861 CAMINO REAL WEST END LOS JARDINES WEST N F4 664 22 14,608 3/22/23 91 68 32 0 Overlay - AC Structural 6/1/15 95 10080 CARLETON ST LILAC AVE CALENDULA AVE E J2 498 36 19,808 3/6/23 91 100 0 0 Overlay - AC Structural 8/30/19 927 10883 CLOVER AVE BUSHARD ST PLUMAS CT E C3 279 36 10,044 4/26/22 91 66 34 0 Surface Treatment - Slurry Seal 6/13/08 142 10122 DELPHINIUM AVE LIVINGSTONE ST NEWHOPE ST E G2 1,180 36 42,480 4/27/21 91 87 0 13 Overlay - AC Structural 6/1/17 185 10162 EL MONTE AVE SAN FRANCISCO ST WARD ST E E5 190 36 8,720 3/2/23 91 66 0 34 Surface Treatment - Slurry Seal 7/1/23 10851 10851 FLAME TREE ST FLAME TREE CIR LA CAPILLA AVE E D4 140 33 4,620 4/29/22 91 45 26 29 New Construction - Initial 1/1/80 259 10229 GLASS MOUNTIAN ST CORIENDER AVE STONECRESS AVE E G3 515 36 21,500 4/26/21 91 87 0 13 Overlay - AC Structural 6/1/16 7011 10839 LA AMAPOLA CIR WEST END KONIGSMARK ST E D5 217 32 6,944 4/21/21 91 100 0 0 Surface Treatment - Slurry Seal 5/26/01 348 10314 LA LILA LN LA ROSA LN LOS JARDINES WEST E F5 303 28 8,484 3/2/23 91 85 0 15 Overlay - AC Structural 6/1/15 349 10315 LA LIMA ST LA ROSA LN LOS JARDINES WEST E F5 358 28 10,024 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 363 10329 LA ROSA CIR LA ROSA LN WEST END E F5 162 28 6,101 3/2/23 91 100 0 0 Overlay - AC Structural 6/1/15

Page 15 of 20 ends
Page 103 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 392 10357 LIVINGSTONE ST BLUEBELL AVE TWINSPAN AVE E G2 842 36 30,312 4/27/21 91 93 0 7 Overlay - AC Structural 6/1/17 9011 10996 LOMBARDI AVE CANTABRIA ST OAK ST E 585 36 21,060 3/8/23 91 95 0 5 New Construction - AC 1/1/10 997 10954 MAMMOTH CT DURANGO RIVER CT PINTO RIVER CT E E6 130 22 2,860 3/7/23 91 100 0 0 Overlay - AC Structural 6/1/12 551 10506 NECTARINE ST WARNER AVE LA ESPERANZA AVE E D4 681 36 26,396 4/14/22 91 81 0 19 Surface Treatment - Slurry Seal 5/31/01 571 10525 ORCHID AVE NEWHOPE ST SHASTA ST E H2 1,170 36 42,120 3/6/23 91 100 0 0 Overlay - AC Structural 8/31/18 597 10551 PERCH AVE WARD ST COLONIAL CIR E F4 238 32 9,496 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 658 10605 SACUILLO ST LOS JARDINES WEST EL MAR AVE E F5 354 36 14,624 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 673 10620 SAN CORZO ST LOS JARDINES EAST SAN PACO AVE E F5 180 36 7,955 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 689 10634 SAN MAIZ ST SAN LEON AVE LOS JARDINES EAST E F5 229 36 8,244 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 727 10671 SANTA FE CIR LA ROCA AVE NORTH END E B5 380 33 12,540 4/29/22 91 100 0 0 Overlay - AC Structural 7/1/11 1003 10962 SLATER FRONTAGE #1 SLATER AVE WEST END E F5 211 29 7,542 3/22/23 91 100 0 0 Overlay - AC Structural 6/1/15 940 10896 SMOKE RIVER CT END ANTELOPE RIVER AVE E E6 185 22 4,070 3/7/23 91 66 34 0 Overlay - AC Structural 6/1/12 860 10796 WALNUT ST LA COLONIA AVE EL CORTEZ AVE E C4 1,893 36 69,548 3/8/23 91 100 0 0 New Construction - Initial 1/1/80 868 10802 WARWICK CIR WINDSOR AVE NORTH END E C5 397 33 17,961 4/29/22 91 76 24 0 Overlay - AC Structural 6/1/10 960 10915 ZION CT END END E E6 231 21 4,851 3/7/23 91 100 0 0 Overlay - AC Structural 6/1/12 69 10059 BUTTERCUP AVE PONDEROSA ST SCOTCH PINE ST E C2 1,000 36 39,760 4/22/24 91 100 0 0 Surface Treatment - Slurry Seal 5/25/01 480 10438 MT CASTILE CIR GARFIELD AVE NORTH END E D7 640 33 22,376 4/24/24 91 95 0 5 Overlay - AC Structural 8/1/20 615 10568 POPPY AVE SIERRA ST SAN GABRIEL ST E H2 690 36 26,720 4/23/24 91 100 0 0 Overlay - AC Structural 8/31/18 815 10752 SWEETLEAF ST EDINGER AVE HONEYSUCKLE AVE E C2 1,156 36 41,616 4/22/24 91 100 0 0 Surface Treatment - Slurry Seal 6/2/01 223 10196 EVEREST CIR AZALEA AVE NORTH END E H2 301 33 11,408 4/23/24 91 100 0 0 Overlay - AC Structural 8/31/18 9002 10843 JOJOBA AVE CHALLIS ST CACHE ST E C2 250 36 9,800 4/22/24 91 100 0 0 Surface Treatment - Slurry Seal 5/26/01 221 10194 ESPEN CIR MT. COLLIEN ST EAST END E H3 379 33 13,982 4/22/24 92 96 0 4 Overlay - AC Structural 8/30/19 124 10107 CORINTH CIR MT. COLLIEN ST EAST END E H3 522 33 18,701 4/22/24 92 100 0 0 Overlay - AC Structural 8/30/19 925 10881 AVENIDA SUENOS CAMINO REAL AVENIDA COMPADRES E F4 240 22 8,130 3/22/23 92 100 0 0 Overlay - AC Structural 6/1/15 9010 10998 CANTABRIA ST ANDALUSIA AVE LOMBARDI AVE E 303 36 10,908 3/8/23 92 100 0 0 New Construction - AC 1/13/10 211 10185 ELBERT CIR CALENDULA AVE NORTH END E J2 330 33 12,365 3/6/23 92 67 0 33 Overlay - AC Structural 8/30/19 212 10186 ELDER ST EL VALLE AVE SLATER AVE E C5 184 36 6,624 4/29/22 92 94 0 6 Overlay - AC Structural 6/1/10 308 10275 KINGS CANYON ST OLYMPIC CT NORTH END E E6 560 33 20,992 4/8/22 92 87 0 13 Overlay - AC Structural 8/1/09 331 10828 LA COLONIA AVE PALM ST OAK ST E C4 1,198 36 45,548 3/8/23 92 91 0 9 Surface Treatment - Slurry Seal 5/26/01 341 10307 LA FLOR AVE LOS JARDINES EAST NIEVES ST E F5 214 33 8,942 3/22/23 92 100 0 0 Overlay - AC Structural 6/1/15 381 10347 LAUREL ST LA PALOMA AVE EL CORTEZ CIR E C4 592 36 21,312 3/8/23 92 100 0 0 Surface Treatment - Slurry Seal 5/26/01 907 10371 LOS JARDINES WEST SLATER AVE SACUILLO ST E F5 2,505 36 97,308 4/7/22 92 100 0 0 Overlay - AC Structural 8/1/09 475 10433 MT BADEN POWELL ST BLUE ALLIUM AVE BELLFLOWER AVE E G2 1,135 36 40,860 4/27/21 92 61 0 39 Overlay - AC Structural 6/1/17 519 10477 MT MATTERHORN ST LILAC AVE LENHARDT AVE E J1 671 36 24,156 3/6/23 92 100 0 0 Overlay - AC Structural 8/30/19 563 10995 OAK ST LA PALOMA AVE CDS E 528 36 20,258 3/8/23 92 100 0 0 New Construction - AC 1/13/10 587 10541 PAULINE LN GARFIELD AVE WARBLER AVE E C7 176 46 7,016 4/29/22 92 67 33 0 Surface Treatment - Slurry Seal 7/1/23 961 10916 PINTO RIVER CT END END E E6 169 21 3,549 3/7/23 92 100 0 0 Overlay - AC Structural 6/1/12 632 10582 RED RIVER CIR WEST END MT. CIMMARON ST E D7 696 36 27,825 4/23/24 92 100 0 0 Overlay - AC Structural 8/1/20 949 10904 STONE RIVER CT END END E E6 147 21 3,087 3/7/23 92 87 13 0 Overlay - AC Structural 6/22/12 809 10987 SUNSET CT NAPA RIVER CT DURANGO RIVER CT E E6 389 22 8,558 3/7/23 92 100 0 0 Overlay - AC Structural 6/1/12 829 10765 TEAPA CIR LA MARQUESA AVE NORTH END E F5 120 33 5,435 3/22/23 92 100 0 0 Overlay - AC Structural 6/1/15 854 10789 VIOLET CIR SAN JACINTO ST EAST END E H2 376 33 13,883 4/23/24 92 100 0 0 Overlay - AC Structural 8/31/18 860 10795 WALNUT ST HEIL AVE GARDENIA AVE E C3 510 36 18,360 3/6/23 92 100 0 0 Surface Treatment - Slurry Seal 1/1/07 869 10803 WASHBURN ST DELPHINIUM AVE EDINGER AVE E G2 513 36 18,468 4/27/21 92 100 0 0 Overlay - AC Structural 6/1/17 155 10132 EDINGER FRONTAGE #1 EDINGER AVE EAST END E J2 265 27 7,155 4/23/24 92 100 0 0 Overlay - AC Structural 8/30/19 653 10600 ROSEWOOD ST HEATHER AVE JASMINE AVE E C2 980 36 37,160 4/22/24 92 100 0 0 Surface Treatment - Slurry Seal 5/31/01 775 10719 SIERRA ST AZALEA AVE ORCHID AVE E H2 1,500 36 55,880 4/23/24 92 100 0 0 Overlay - AC Structural 8/31/18 826 10762 TANNAS AVE MT. YOUNIS ST MT. HUTCHINGS ST E H3 383 35 13,905 4/23/24 92 100 0 0 Overlay - AC Structural 8/30/19 486 10443 MT COLLIEN ST KIRWIN CIR QUARTZ AVE E H3 512 36 18,432 4/22/24 92 97 0 3 Overlay - AC Structural 8/30/19 271 10241 HAWTHORN ST STARLING AVE ELLIS AVE E D7 506 36 18,216 4/23/24 93 27 73 0 Overlay - AC Structural 8/1/20 434 10394 MARIGOLD CIR SIERRA ST EAST END E H2 410 33 15,005 4/23/24 93 100 0 0 Overlay - AC Structural 8/31/18 6 10005 ALMOND ST HEIL AVE BUTTERCUP AVE E C2 175 64 9,700 4/22/24 93 84 0 16 Surface Treatment - Slurry Seal 5/25/01 13 10012 ANTELOPE RIVER AVE KINGS CANYON ST WARD ST E E6 1,191 36 41,485 3/7/23 93 91 0 9 Overlay - AC Structural 6/1/12 982 10939 AZTEC CT FALL RIVER CT ADOBE RIVER AVE E E6 230 22 5,060 3/7/23 93 100 0 0 Overlay - AC Structural 6/1/12 11000 10993 BAYBERRY ST POINSETTIA AVE LILY AVE E C3 299 36 10,764 3/6/23 93 100 0 0 New Construction - Initial 1/1/80 55 10047 BOXWOOD CIR SOUTH END LA AMAPOLA AVE E D5 269 32 11,120 4/21/21 93 100 0 0 Surface Treatment - Slurry Seal 5/25/01

Page 16 of 20 ends
Page 104 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 101 10086 CATSKILL AVE SHASTA ST ROSEMARY AVE E H2 270 36 11,600 3/6/23 93 100 0 0 Overlay - AC Structural 8/31/18 996 10953 COLUMBIA RIVER CT KINGS CANYON ST ZION CT E E6 220 22 4,840 3/7/23 93 100 0 0 Overlay - AC Structural 6/1/12 977 10934 COYOTE RIVER CT CAPITAL REEF CT END E E6 101 22 2,222 3/7/23 93 100 0 0 Overlay - AC Structural 6/1/12 184 10161 EL MOLINO CIR BAY ST EAST END E C5 340 33 14,280 4/25/22 93 100 0 0 Overlay - AC Structural 6/1/10 188 10165 EL MORADO AVE BAY CIR WALNUT ST E C5 353 33 13,749 4/29/22 93 100 0 0 Overlay - AC Structural 6/1/10 218 10991 ELM ST GARDENIA AVE POINSETTIA AVE E C3 304 36 10,944 3/6/23 93 73 0 27 New Construction - Initial 1/1/80 218 10992 ELM ST POINSETTIA AVE LILY AVE E C3 298 36 10,728 3/6/23 93 100 0 0 New Construction - Initial 1/1/80 963 10918 GLACIER CT END END E E6 168 21 3,528 3/7/23 93 100 0 0 Overlay - AC Structural 6/1/12 281 10250 HEVER CIR WINDSOR AVE NORTH END E C5 450 33 17,910 4/29/22 93 100 0 0 Overlay - AC Structural 6/1/10 302 10270 JUNCO AVE CAPENSE ST BUSHARD ST E C7 168 46 6,648 4/29/22 93 100 0 0 Surface Treatment - Slurry Seal 7/1/23 331 10298 LA COLONIA AVE OAK ST EAST END E C4 1,080 36 42,280 3/8/23 93 100 0 0 Surface Treatment - Slurry Seal 5/26/01 392 10358 LIVINGSTONE ST PRIMROSE AVE SNOWDROP AVE E G2 537 36 21,212 4/27/21 93 44 0 56 Overlay - AC Structural 6/1/17 421 10383 LOYA RIVER AVE MT. GUSTIN ST MT. GIST CIR E J2 746 36 28,736 3/6/23 93 83 0 17 Overlay - AC Structural 8/30/19 422 10384 LOYA RIVER CIR MT. GIST CIR EAST END E J2 144 36 6,659 3/6/23 93 100 0 0 Overlay - AC Structural 8/30/19 441 10401 MAZA CIR DAISY AVE CDS E C3 233 33 11,044 3/6/23 93 100 0 0 Overlay - AC Structural 6/13/08 493 10451 MT DUNHAVEN ST HEIL AVE TOPAZ AVE E G2 511 36 20,276 4/27/21 93 66 0 34 Overlay - AC Structural 6/1/17 501 10459 MT GUSTIN ST EDINGER AVE LOYA RIVER AVE E J2 509 36 19,074 3/6/23 93 100 0 0 Overlay - AC Structural 8/30/19 507 10465 MT HICKS ST BELLFLOWER AVE EDINGER AVE E G2 717 36 27,692 4/27/21 93 80 0 20 Overlay - AC Structural 6/1/17 522 10480 MT MITCHELL CIR LENHARDT AVE SOUTH END E J1 563 33 20,054 3/6/23 93 100 0 0 Overlay - AC Structural 8/30/19 525 10483 MT NEWBERRY CIR IVORY AVE NORTH END E G2 352 33 13,091 4/27/21 93 90 0 10 Overlay - AC Structural 6/1/17 527 10484 MT NIMBUS ST CORAL ALOE AVE NORTH END E G2 305 36 12,455 4/27/21 93 100 0 0 Overlay - AC Structural 6/1/17 990 10947 RIO GRANDE CT YELLOWSTONE CT ANTELOPE RIVER AVE E E6 195 22 4,290 3/7/23 93 78 22 0 Overlay - AC Structural 6/1/12 706 10650 SANTA ALBERTA CIR ELLIS AVE NORTH END E B6 565 33 21,705 4/25/22 93 100 0 0 Overlay - AC Structural 7/1/11 769 10713 SHASTA ST CATSKILL AVE AZALEA AVE E H2 2,548 33 85,964 3/6/23 93 86 0 14 Overlay - AC Structural 8/31/18 852 10787 VACAS CIR LA MARQUESA AVE NORTH END E F5 166 33 6,953 3/22/23 93 100 0 0 Overlay - AC Structural 6/1/15 878 10811 WHITECAP CIR ROSEMARY AVE SOUTH END E H2 212 33 8,471 3/6/23 93 100 0 0 Overlay - AC Structural 8/31/18 647 10595 ROBIN AVE BUSHARD ST REDWOOD CIR E D7 1,170 36 42,120 4/23/24 93 100 0 0 Overlay - AC Structural 8/1/20 882 10815 WINTERGREEN CIR SWEETLEAF ST WEST END E C2 581 33 20,648 4/22/24 94 100 0 0 New Construction - Initial 1/1/80 274 10243 HEATHER AVE SANDALWOOD ST ROSEWOOD ST E C2 598 36 23,408 4/22/24 94 100 0 0 Surface Treatment - Slurry Seal 5/25/01 625 10575 QUARTZ CIR MT. YOUNIS ST EAST END E H3 266 36 11,051 4/23/24 94 90 0 10 Overlay - AC Structural 8/30/19 75 10064 CALADIUM AVE ROUTT ST SWEETLEAF ST E C2 1,304 36 46,944 4/22/24 94 79 0 21 Surface Treatment - Slurry Seal 5/25/01 174 10151 EL CORTEZ AVE NORTHWEST END WALNUT ST E C4 650 36 27,852 3/8/23 94 100 0 0 Surface Treatment - Slurry Seal 5/25/01 222 10195 EVANS CIR ROSEMARY AVE SOUTH END E H2 143 33 6,194 3/6/23 94 100 0 0 Overlay - AC Structural 8/31/18 239 10210 FLOWER AVE EUCLID ST MT. TRICIA ST E G2 925 36 33,300 4/27/21 94 91 0 9 Overlay - AC Structural 6/1/17 474 10432 MT ARARAT CIR IVORY AVE NORTH END E G2 352 33 13,091 4/27/21 94 73 0 27 Overlay - AC Structural 6/1/17 487 10445 MT COOK CIR STONECRESS AVE NORTH END E G3 370 33 13,685 4/26/21 94 95 0 5 Overlay - AC Structural 6/1/16 489 10447 MT CRAIG CIR CORAL ALOE AVE NORTH END E G2 307 33 11,606 4/27/21 94 88 0 12 Overlay - AC Structural 6/1/17 494 10452 MT EDEN CIR SANDSTONE AVE NORTH END E G3 513 36 19,943 4/26/21 94 91 0 9 Overlay - AC Structural 6/1/16 495 10453 MT EDEN ST SANDSTONE AVE WARNER AVE E G3 686 36 24,696 4/26/21 94 86 0 14 Overlay - AC Structural 6/1/16 527 10485 MT NIMBUS ST SOUTH END CORAL ALOE AVE E G2 693 36 24,948 4/27/21 94 94 0 6 Overlay - AC Structural 6/1/17 530 10488 MT PRIETO CIR LILAC AVE SOUTH END E J2 487 33 17,871 3/6/23 94 100 0 0 Overlay - AC Structural 8/30/19 603 10557 PHILLIPS AVE FOSTER ST BROOKHURST ST E D6 1,005 32 33,096 3/7/23 94 100 0 0 Overlay - AC Structural 8/1/09 652 10599 ROSEMARY AVE NEWHOPE ST ORCHID AVE E H2 1,101 36 43,396 3/6/23 94 100 0 0 Overlay - AC Structural 8/31/18 770 10714 SHENANDOAH ST ADOBE RIVER AVE NORTH END E E6 724 33 26,404 3/7/23 94 100 0 0 Overlay - AC Structural 6/1/12 842 10778 TOPAZ AVE MT. DUNHAVEN ST WEST END E G2 130 33 6,170 4/27/21 94 88 0 12 Overlay - AC Structural 6/1/17 521 10479 MT MILLS ST GALENA AVE GEODE AVE E H3 247 33 8,151 4/22/24 94 100 0 0 Overlay - AC Structural 8/30/19 844 10780 TOUCAN AVE BUSHARD ST JACARANDA ST E D6 1,455 36 52,380 4/25/24 94 100 0 0 Surface Treatment - Slurry Seal 7/1/23 245 10216 GALENA AVE MT. HUTCHINGS ST MT. MILLS ST E H3 344 33 11,352 4/22/24 95 100 0 0 Overlay - AC Structural 8/30/19 510 10468 MT HUTCHINGS ST GOODALE AVE WINTERSBURG AVE E H3 1,175 36 42,300 4/22/24 95 100 0 0 Overlay - AC Structural 8/30/19 42 10036 BELLFLOWER AVE EUCLID ST MT. HICKS ST E G2 1,195 36 43,020 4/27/21 95 100 0 0 Overlay - AC Structural 6/1/17 146 10125 DEW DROP AVE MT. TODD ST MT. KIBBY ST E G3 257 36 13,012 4/26/21 95 100 0 0 Overlay - AC Structural 6/1/16 500 10458 MT GIST CIR LOYA RIVER AVE SOUTH END E J2 154 32 6,403 3/6/23 95 100 0 0 Overlay - AC Structural 8/30/19 503 10461 MT HARKNESS ST CORAL ALOE AVE BELLFLOWER ST E G2 575 36 20,700 4/27/21 95 86 0 14 Overlay - AC Structural 6/1/17 511 10469 MT ISLIP CIR BLUE ALLIUM AVE NORTH END E G2 307 33 11,606 4/27/21 95 100 0 0 Overlay - AC Structural 6/1/17 517 10475 MT LOWE CIR CORAL ALOE AVE NORTH END E G2 307 33 11,606 4/27/21 95 100 0 0 Overlay - AC Structural 6/1/17 524 10482 MT NEOTA ST STONECRESS AVE HEIL AVE E G3 533 36 19,188 4/26/21 95 94 0 6 Overlay - AC Structural 6/1/16

Page 17 of 20 ends
Page 105 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 536 10494 MT TRICIA ST PETAL AVE EDINGER AVE E G2 461 36 18,476 4/27/21 95 77 0 23 Overlay - AC Structural 6/1/17 600 10554 PETAL AVE EUCLID ST MT. TRICIA ST E G2 926 36 35,216 4/27/21 95 93 0 7 Overlay - AC Structural 6/1/17 650 10597 ROSE AVE OLIVE ST BUSHARD ST E C3 190 36 6,840 3/6/23 95 100 0 0 Surface Treatment - Slurry Seal 6/13/08 297 10265 JAMES RIVER CIR WEST END MT. CIMMARON ST E D7 693 36 38,833 4/23/24 95 100 0 0 Overlay - AC Structural 8/1/20 87 10074 CANDYTUFT CIR NEWHOPE ST EAST END E H3 585 37 23,367 4/22/24 95 81 0 19 Overlay - AC Structural 8/30/19 262 10232 GOODALE AVE MT. HUTCHINGS ST HARBOR BVD E H3 522 36 18,792 4/22/24 95 100 0 0 Overlay - AC Structural 8/30/19 637 10586 REDWOOD ST GUAVA AVE STARLING AVE E D7 1,291 36 47,412 4/23/24 96 92 0 8 Overlay - AC Structural 8/1/20 482 10440 MT CIMARRON ST GARFIELD AVE NORTH END E D7 1,307 36 46,740 4/23/24 96 78 0 22 Overlay - AC Structural 8/1/20 121 10104 CORAL ALOE AVE MT. BADEN-POWELL ST MT. NIMBUS ST E G2 1,017 36 36,612 4/27/21 96 86 0 14 Overlay - AC Structural 6/1/17 230 10202 FARNHAM ST SNOWDROP AVE GOLDENROD AVE E G2 269 36 11,564 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 258 10227 GLADSTONE CIR MT. COLLIEN ST WEST END E H3 574 33 20,417 4/22/24 96 91 0 9 Overlay - AC Structural 8/30/19 261 10231 GOLDENROD AVE FARNHAM ST RAINIER ST E G2 478 36 19,088 4/27/21 96 92 0 8 Overlay - AC Structural 6/1/17 295 10263 IVORY AVE MT. DUNHAVEN ST VERNON ST E G2 1,020 36 38,600 4/27/21 96 85 0 15 Overlay - AC Structural 6/1/17 490 10448 MT DANA CIR BLUE ALLIUM AVE NORTH END E G2 307 33 11,606 4/27/21 96 91 0 9 Overlay - AC Structural 6/1/17 512 10470 MT JACKSON ST LILAC AVE LENHARDT AVE E J1 671 36 24,156 3/6/23 96 100 0 0 Overlay - AC Structural 8/30/19 513 10471 MT KELLER CIR IVORY AVE NORTH END E G2 352 33 13,091 4/27/21 96 90 0 10 Overlay - AC Structural 6/1/17 514 10472 MT KIBBY ST STONECRESS AVE DEW DROP AVE E G3 437 36 17,612 4/26/21 96 92 0 8 Overlay - AC Structural 6/1/16 569 10523 OPAL AVE VERNON ST NEWHOPE ST E G2 170 36 6,120 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 618 10570 PRIMROSE AVE NEWHOPE ST LIVINGSTONE ST E G2 1,188 36 44,648 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 851 10786 TWINSPAN AVE MT. NIMBUS CT MT. BODIE ST E G2 573 36 22,508 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 853 10788 VERNON ST PRIMROSE AVE IVORY AVE E G2 1,161 36 43,676 4/27/21 96 100 0 0 Overlay - AC Structural 6/1/17 17 10016 AQUAMARINE CIR MT. COLLIEN ST WEST END E H3 561 33 19,988 4/22/24 96 100 0 0 Overlay - AC Structural 6/1/19 63 10053 BUSHARD FRONTAGE #6 ROBIN AVE NORTH END E D7 487 26 14,099 4/23/24 96 78 0 22 Overlay - AC Structural 8/1/20 877 10810 WHITE RIVER CIR WEST END MT. CIMMARON ST E D7 222 33 9,838 4/23/24 96 68 0 32 Overlay - AC Structural 8/1/20 464 10422 MOON RIVER CIR WEST END MT. CIMMARON ST E D7 179 32 8,367 4/23/24 97 75 0 25 Overlay - AC Structural 8/1/20 799 10738 STARLING AVE BUSHARD ST REDWOOD CIR E D7 1,163 36 41,868 4/23/24 97 100 0 0 Overlay - AC Structural 8/1/20 18 10017 ARBUTUS ST SMOKE TREE AVE GUAVA AVE E D7 363 36 14,004 4/24/24 97 100 0 0 Overlay - AC Structural 8/1/20 626 10576 QUINCE CIR SMOKE TREE AVE NORTH END E D7 415 32 14,720 4/24/24 97 100 0 0 Overlay - AC Structural 8/1/20 4 10003 ACONITE AVE MT. EMMA ST MT. NIMBUS ST E G2 254 36 11,024 4/27/21 97 74 0 26 Overlay - AC Structural 6/1/17 496 10454 MT EMMA ST BLUE ALLIUM AVE ACONITE AVE E G2 315 36 15,100 4/27/21 97 88 0 12 Overlay - AC Structural 6/1/17 535 10493 MT TODD ST STONECRESS AVE DEW DROP AVE E G3 636 36 24,776 4/26/21 97 100 0 0 Overlay - AC Structural 6/1/16 628 10578 RAINIER ST PRIMROSE AVE SNOWDROP AVE E G2 537 36 19,332 4/27/21 97 100 0 0 Overlay - AC Structural 6/1/17 785 10726 SNOWDROP AVE MT. NIMBUS ST VERNON ST E G2 1,289 36 46,404 4/27/21 97 89 0 11 Overlay - AC Structural 6/1/17 554 10509 NIAGARA RIVER AVE MT. CIMMARON ST BROOKHURST ST E D7 487 36 17,532 4/23/24 97 85 0 15 Overlay - AC Structural 8/1/20 635 10834 REDWOOD CIR STARLING AVE NORTH END E D7 434 36 17,144 4/23/24 97 88 0 12 Overlay - AC Structural 6/1/20 102 10088 CEDAR CIR ROBIN AVE NORTH END E D7 419 33 15,083 4/23/24 97 100 0 0 Overlay - AC Structural 8/1/20 226 10199 EVERGREEN CIR ROBIN AVE NORTH END E D7 417 33 15,017 4/23/24 97 97 0 3 Overlay - AC Structural 8/1/20 793 10732 SPRUCE CIR ROBIN AVE NORTH END E D7 423 33 15,215 4/23/24 97 97 0 3 Overlay - AC Structural 8/1/20 388 10354 LIME CIR STARLING AVE NORTH END E D7 432 33 15,512 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 599 10553 PERSIMMON ST GARFIELD AVE SMOKE TREE AVE E D7 481 36 17,316 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 772 10716 SHIMIZU RIVER CIR WEST END PERSIMMON CIR E D7 686 33 24,158 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 784 10725 SMOKE TREE AVE BUSHARD ST PERSIMMON CIR E D7 1,131 36 40,716 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 7005 10833 PERSIMMON CIR SMOKE TREE AVE NORTH END E D7 139 36 6,524 4/24/24 98 100 0 0 Overlay - AC Structural 8/1/20 921 10877 ALLEY W/O EVEREST CIR EVEREST ST AZALEA AVE O H2 1,408 22 26,752 4/27/21 98 100 0 0 New Construction - Initial 1/1/80 478 10436 MT BODIE ST PRIMROSE AVE TWINSPAN AVE E G2 264 36 11,384 4/27/21 98 100 0 0 Overlay - AC Structural 6/1/17 883 10816 WINTERSBURG AVE WARNER AVE MT. HUTCHINGS ST E H3 780 36 28,080 4/29/22 98 100 0 0 New Construction - Initial 1/1/80 233 10205 FINCH AVE REDWOOD ST EAST END E D7 784 36 28,791 4/24/24 98 100 0 0 Overlay - AC Structural 8/1/20 820 10757 TAHOE CIR SOUTH END ELLIS AVE E D7 285 33 10,661 4/23/24 98 100 0 0 Overlay - AC Structural 8/1/20 267 10237 GUAVA AVE ARBUTUS ST REDWOOD ST E D7 272 36 11,664 4/24/24 99 100 0 0 Overlay - AC Structural 8/1/20 65 10055 BUSHARD FRONTAGE #5 SOUTH END NORTH END E D7 208 27 6,571 4/25/24 99 100 0 0 Overlay - AC Structural 8/1/20 387 10353 LIATRIS CIR HICKORY ST WEST END E C2 167 33 6,986 4/22/24 99 100 0 0 Surface Treatment - Slurry Seal 5/26/01 10 10009 ANDOVER CIR MCDERMITT ST WEST END E D1 144 33 6,227 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 15 10014 APPLE ST PETUNIA AVE HEIL AVE E D3 1,202 36 43,272 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 22 10020 ASPEN ST CARNATION AVE AZALEA AVE E D2 973 36 36,908 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 23 10021 ASTER CIR APPLE ST EAST END E D3 507 33 18,206 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 30 10025 AZALEA AVE ASPEN ST HEMLOCK ST E D2 321 36 13,436 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21

Page 18 of 20 ends
Page 106 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 31 10026 AZALEA CIR SPRUCE ST CDS E D2 378 33 13,949 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 36 10030 BASIL ST EDINGER AVE SHAMROCK AVE E D2 284 36 10,224 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 43 10037 BENICHIA CIR STILLBITE AVE SOUTH END E E1 113 33 5,204 4/21/21 100 50 46 4 Overlay - AC Structural 8/1/20 58 10050 BRIDGEPORT ST MARIPOSA AVE CURRANT AVE E D3 288 36 12,248 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 61 10051 BUCKEYE CIR MARIPOSA AVE NORTH END E D3 339 33 12,662 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 64 10054 BUSHARD FRONTAGE #1 BUSHARD ST NORTH END E D3 255 27 7,641 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 66 10056 BUSHARD FRONTAGE #2 ROSE AVE NORTH END E D3 520 28 15,395 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 67 10057 BUSHARD FRONTAGE #3 MARIPOSA AVE NORTH END E D3 375 28 11,335 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 70 10060 BUTTERFIELD ST DEBIOIS AVE CITY LIMIT E D1 660 36 23,760 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 71 10061 BUTTERNUT CIR MARIPOSA AVE NORTH END E D3 349 33 12,992 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 84 10071 CAMROSE CIR SHADBUSH ST CDS E D2 384 33 14,147 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 96 10081 CARNATION AVE BUSHARD ST REDWOOD ST E D2 1,178 36 42,408 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 105 10090 CHENILLE AVE MEQUITE ST REDWOOD ST E D2 271 36 11,636 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 112 10097 CLARENDON ST DEBIOIS AVE CITY LIMIT E D1 485 36 18,210 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 132 10112 CROCUS AVE ROUTT ST SWEETLEAF ST E C2 1,305 36 48,860 4/22/24 100 0 0 0 Surface Treatment - Slurry Seal 5/25/01 9004 10845 CURRANT AVE BROOKHURST ST BRIDGEPORT ST E D3 684 36 26,504 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 135 10115 DAHLIA CIR SHADBUSH ST CDS E D2 385 33 14,180 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 141 10121 DEBIOIS AVE MOSS GLEN AVE MCCORD CIR E D1 1,131 36 42,596 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 220 10193 EMMONS CIR TAHOMA ST WEST END E D3 468 33 18,799 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 232 10204 FILBERT ST DANDELION AVE GLADIOLA AVE E D2 1,020 36 36,720 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 9003 10844 FOXGLOVE AVE MAGNOLIA ST HICKORY ST E C2 305 36 10,980 4/22/24 100 0 0 0 Surface Treatment - Slurry Seal 5/25/01 247 10218 GARDENIA AVE BUSHARD ST REDWOOD ST E D3 1,173 36 42,228 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 255 10225 GLADIOLA AVE SYCAMORE ST SHADBUSH ST E D2 586 36 21,096 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 256 10226 GLADIOLA CIR SHADBUSH ST CDS E D2 383 33 14,114 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 275 10244 HELENA CIR SOUTH END NORTH END E D3 428 33 17,074 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 277 10246 HEMLOCK CIR GARDENIA AVE NORTH END E D3 418 33 15,269 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 278 10247 HEMLOCK ST CARNATION AVE HEIL AVE E D2 1,170 36 42,120 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 279 10248 HEMP CIR HIBISCUS AVE CDS E D2 222 33 10,681 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 282 10251 HIBISCUS AVE REDWOOD ST HEMP CIR E D2 546 36 21,536 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 283 10252 HICKORY ST MINT AVE FOXGLOVE AVE E C2 869 36 31,284 4/22/24 100 0 0 0 Surface Treatment - Slurry Seal 5/25/01 284 10253 HIRAM ST EDINGER AVE MOSS GLEN AVE E D1 175 36 6,300 4/26/24 100 0 0 0 Overlay - AC Structural 6/1/23 306 10273 KENDALL CIR MEAGHER ST CDS E D1 86 33 4,313 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 379 10345 LAS FLORES ST EDINGER AVE CITY LIMIT E E1 615 36 22,140 4/23/21 100 0 0 100 Overlay - AC Structural 8/1/20 394 10360 LOLO CIR PEARL AVE NORTH END E D3 148 33 6,359 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 396 10362 LOS ALTOS ST MORNING GLORY AVE MARGARITA AVE E F1 308 36 12,968 4/23/21 100 61 29 10 Overlay - AC Structural 8/1/20 401 10365 LOS COCHES ST SUNN CIR EDINGER AVE E E1 198 36 7,128 4/21/21 100 79 13 8 Overlay - AC Structural 8/1/20 404 10368 LOS GATOS ST MORNING GLORY AVE EDINGER AVE E F1 200 36 7,200 4/23/21 100 87 0 13 Overlay - AC Structural 8/1/20 415 10378 LOS REYES ST MORNING GLORY AVE LEHNHARDT AVE E F1 637 36 24,812 4/23/21 100 86 0 14 Overlay - AC Structural 8/1/20 424 10386 MADRONE CIR MARIPOSA AVE NORTH END E D3 349 33 12,992 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 427 10388 MAIDSTONE ST SUNN CIR CITY LIMIT E E1 460 36 18,440 4/21/21 100 50 50 0 Overlay - AC Structural 8/1/20 432 10392 MARGARITA AVE LAS FLORES ST WARD ST E E1 1,172 36 42,192 4/23/21 100 0 0 0 Overlay - AC Structural 8/1/20 432 10393 MARGARITA AVE WARD ST LOS ALTOS ST E F1 504 36 20,024 4/23/21 100 60 38 2 Overlay - AC Structural 8/1/20 445 10405 MC CORD CIR DEBIOIS AVE CDS E D1 211 33 10,318 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 446 10406 MC DERMITT ST NEWFAME CIR RINDGE CIR E D1 555 36 19,980 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 451 10410 MEAGHER ST DEBIOIS AVE BROOKHURST ST E D1 843 36 30,348 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 452 10411 MERCED RIVER AVE BROOKHURST ST MT. GALE CIR E D3 537 36 21,212 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 455 10413 MESQUITE ST SORREL ST CHENILLE AVE E D2 463 36 18,548 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 456 10414 MINT AVE MAGNOLIA ST HICKORY ST E C2 305 36 10,980 4/22/24 100 0 0 0 Surface Treatment - Slurry Seal 5/31/01 458 10416 MITTERBILL ST EDINGER AVE DEBIOIS AVE E D1 175 36 6,300 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 466 10424 MORNING GLORY AVE LAS FLORES ST WARD ST E E1 1,172 36 42,192 4/23/21 100 0 0 100 Overlay - AC Structural 8/1/20 466 10425 MORNING GLORY AVE LOS ALTOS ST LOS GATOS ST E F1 785 36 28,260 4/23/21 100 83 0 17 Overlay - AC Structural 8/1/20 468 10426 MORNING GLORY CIR LOS ALTOS ST CDS E F1 403 36 15,983 4/23/21 100 0 0 100 Overlay - AC Structural 8/1/20 470 10428 MOSS GLEN AVE RINDGE CIR DEBIOIS AVE E D1 998 36 35,928 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 499 10457 MT GALE CIR MERCED RIVER AVE SOUTH END E D3 150 33 8,305 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 502 10460 MT HANNA CIR MERCED RIVER AVE SOUTH END E D3 128 33 5,699 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 771 10715 MT SHERROD CIR HEIL AVE SOUTH END E D3 345 36 13,895 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22

Page 19 of 20 ends
Page 107 ends

City of Fountain Valley, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by PCI Order (0-100)
BranchID Sec ID Name From To Rank Grid # L W Area Insp. Date PCI PCI % Climate PCI % Load PCI % Other Work Type Work Date 553 10508 NEWFAME CIR BUSHARD ST EAST END E D1 667 36 24,012 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 578 10532 OVERTON ST MOSS GLEN AVE WEARE AVE E D1 522 36 20,672 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 588 10542 PAWLET CIR BUTTERFIELD ST EAST END E D1 272 33 10,451 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 590 10544 PEARL AVE BUSHARD ST HELENA CIR E D3 428 36 15,408 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 594 10548 PEONY CIR LOS REYES ST CDS E F1 378 33 13,949 4/23/21 100 50 37 13 Overlay - AC Structural 8/1/20 601 10555 PETUNIA AVE SILKTREE ST BROOKHURST ST E D3 1,192 36 42,912 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 616 10569 POPPY CIR SPRUCE ST EAST END E D2 381 33 14,048 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 629 10579 RARITAN AVE BUTTERFIELD ST MEAGHER ST E D1 574 36 20,664 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 637 10585 REDWOOD ST MARIPOSA AVE NORTH END E D3 1,699 36 62,639 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 637 10587 REDWOOD ST SHAMROCK AVE MARIGOLD AVE E D2 1,612 36 58,032 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 644 10593 RINDGE CIR MOSS GLEN AVE CDS E D1 413 33 16,604 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 650 10598 ROSE AVE BUSHARD ST REDWOOD ST E D3 1,184 36 42,624 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 655 10602 ROUTT ST MINT AVE CROCUS ST E C2 430 36 17,360 4/22/24 100 0 0 0 Surface Treatment - Slurry Seal 5/31/01 659 10606 SAGE CIR APPLE ST EAST END E D3 514 33 18,437 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 765 10709 SEQUOIA ST PETUNIA AVE ZINNIA AVE E D3 1,031 36 38,996 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 766 10710 SHADBUSH ST DANDELION AVE GLADIOLA AVE E D2 1,025 36 36,900 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 777 10721 SILKTREE ST MARIPOSA AVE NORTH END E D3 1,720 36 63,395 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 790 10730 SPENCER AVE MT. LANGLEY ST PACIFIC ST I F6 1,131 46 52,026 4/22/21 100 100 0 0 Overlay - AC Structural 8/1/09 800 10739 STILBITE AVE BROOKHURST ST MAIDSTONE ST E E1 1,171 36 42,156 4/21/21 100 0 0 0 Overlay - AC Structural 8/1/20 807 10745 SUNN AVE LOS COCHES ST MAIDSTONE ST E E1 545 36 21,500 4/21/21 100 62 38 0 Overlay - AC Structural 8/1/20 808 10746 SUNN CIR LOS COCHES ST WEST END E E1 228 33 8,999 4/21/21 100 48 52 0 Overlay - AC Structural 8/1/20 811 10748 SWALLOW AVE SANTA MARTA ST SANTA BARBARA ST E B7 1,203 36 44,244 4/22/22 100 90 10 0 Overlay - AC Structural 7/1/11 821 10758 TAHOMA ST WARNER AVE EMMONS CIR E D3 484 33 17,852 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 835 10771 THISTLE AVE SHADBUSH ST BROOKHURST ST E D2 578 36 20,808 12/1/21 100 0 0 0 Overlay - AC Structural 12/1/21 846 10782 TRILLIUM AVE REDWOOD ST SILKTREE ST E D3 268 36 9,648 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 873 10807 WEARE AVE OVERTON ST CLARENDON ST E D1 498 36 19,808 6/1/23 100 0 0 0 Overlay - AC Structural 6/1/23 884 10817 WINTHROP CIR TAHOMA ST WEST END E D3 466 33 16,853 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 888 10821 WOODRIDGE CIR MARIPOSA AVE NORTH END E D3 350 33 13,025 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 895 10826 ZINNIA AVE SEQUOIA ST APPLE ST E D3 260 36 11,240 9/1/22 100 0 0 0 Overlay - AC Structural 9/1/22 110.6 21,602,659

Page 20 of 20 ends
Page 108 ends

City of Fountain Valley, CA Page 14
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
XIII. APPENDIX C – GIS DIGITAL DATA
Introduction
The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road information is pavement condition. Maintaining an inventory of pavement condition will enhance OCTA’s GIS visualization and analysis capabilities and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report.

Structure of GIS Data
The GIS dataset must consist of linear geographic features that represent road/street segments. All segments that are part of the report should be included in the GIS dataset. The attribute information of each segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above.

The GIS data requirements are discussed below. Most commercial and open-source GIS software provide industrystandard tools to manage GIS data to meet these requirements.

GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
• Esri Shapefile, or
• Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
• Title of Dataset
• Tags (A set of words that can be used by GIS to search for the resource. For example: “pavement”, “transportation”, “roads”)
• Summary (A brief purpose statement of the dataset)
• Description (A brief narrative of the dataset’s content) • Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type
The spatial geometry of the segment features must be lines that represent the roadway centerline as accurately as possible.

Projection
The GIS data must have spatial reference information and have its coordinate system identified and embedded in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected coordinate system:

Page 109 ends

City of Fountain Valley, CA Page 15
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
• NAD 1983 State Plane California VI FIPS 0406 (US Feet) - More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/ GIS Feature Attributes
The required segment attributes are:
• Street name
• Unique segment identifier (Segment ID from original source if available) • Name of intersecting road at the beginning of a segment • Name of intersecting road at the end of the segment
• Current pavement condition index (PCI)
• Current PCI inspection date
• Length of road segment in feet
• Width of road segment in feet
• Paved area of road segment in square feet or square yards • Projected PCI at end of Seven-Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided.

Page 110 ends

City of Fountain Valley, CA Page 16
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
XIV. APPENDIX D – QUALITY ASSURANCE / QUALITY CONTROL PLAN Introduction
When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management program.

The Quality Assurance / Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for update of the pavement management program.

Objectives
This document constitutes a formal QA/QC Plan for the City of Fountain Valley. It was prepared on March, 2018 and last revised in March, 2024.

Specifically, it is intended for the 2024 Pavement Management Plan Update. The focus is on the collection of network-level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP) Synthesis 401 Quality Management of Pavement Data Collection, as “Network-level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices”.

This document also addresses the QA/QC plan requirements of the Orange County Transportation Authority (OCTA)’s “Countywide Pavement Management Plan Guidelines” (Section 2.4), adopted in May 2010.

Structure of QA/QC Plan
The following components are addressed in this QA/QC Plan:
• Condition survey procedures used;
• Accuracy required for data collection;
• Inspector qualifications and experience; and
• Safety.

Page 111 ends

City of Fountain Valley, CA Page 17
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
Condition Survey Procedures
The governing document in performing condition surveys for the City of Fountain Valley is ASTM D6433 “Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys.” Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type:

As required by the Orange County Transportation Authority (OCTA), the City of Fountain Valley must prepare and implement a quality assurance / quality control (QA/QC) plan regarding pavement management inspection as they pertain to MicroPAVER. For the purposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project.

Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and ensures that it complies with the OCTA guidelines defined within the “Countywide Pavement Management Plan Guidelines (CPMPG)”.

As shown within the OCTA CPMPG, our staff followed and delivered on the requirements stated within Chapter 2, page 2-5 which require specific QA/QC data (Items A through G). Additionally, Chapter 3 requires numerous data/deliverables from local agencies for OC Go eligibility. All general PCI budgetary report submittals will follow the Chapter 3 guidelines.

In conjunction with the outlined items within the CPMPG Section 2 we have summarized our QA/QC procedures below:

Page 112 ends

City of Fountain Valley, CA Page 18
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
a. Descriptions of condition survey - Our staff follows the required Condition Survey Protocols (CPMPG, Chapter 2); our staff assesses each pavement section for the minimum distresses outlined within Chapter 2, page 2-1. Additionally, based on the pavement conditions found, we collect all MicroPAVER/StreetSaver Army Corps of Engineers(ACOE) distresses, if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information.
b. How data was collected - Our surveys follow the OCTA accepted walking requirements. All sections that our staff surveys are performed through the walking method, approximately 10% of all sections surveyed were complemented with windshield surveys based on unique conditions found. Our staff physically measures the width of every section as well as measure for any square footage adjustment that need to be added or taken away from a sections “true area” (i.e. cul-desac, bus pads, street width variances, etc.). Samples taken always include a minimum of 2,500 SF coverage unless specific section limits prohibit this. Arterial section samples utilize a 3,500 SF sample size due to the larger section area (this is within the ASTM D6433 sample size calculation.

Field crews typically include one individual for residential pavement sections while Arterial (MPAH) routes utilize a two-person crew for safety, traffic control and increases quality control. c. Accuracy required for data collection - We use a statistical sampling approach for measuring the quality of our field technician’s work. In this manner, 10 percent of the original surveys are resurveyed by a different survey crew than the original, supervised by a field supervisor, and the results are compared to the original surveys. Our QC process involves checking the field crews’ work in a “blind study” fashion. Quality control checks are performed at the end of each survey week. This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments.
 When QA/QC issues are found, our staff documents the issues within MicroPAVER’s user interface. If distress types found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 20% of the original survey d. Random and Systematic Re-Inspections – As described above our staff re-inspects, as a minimum, 10% of the original survey (OCTA only requires 5%). Per the agencies requests, our staff will submit PCI reports to the agency as project status reports for their review. Agencies will typically review specific pavement sections for PCI accuracy based on recent overlay or slurry seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts).

Additionally, our staff performs “ride-a-long” surveys with local agency staff to build consensus on how our MicroPAVER/StreetSaver ACOE surveys are performed, recorded and reported on.

Random re-inspections will include a representative selection across the following categories:
• Functional classed (i.e. MPAH, locals);
• Surface types (e.g. AC or PCC);
• Pavement conditions (e.g. good, fair, poor);
• Inspectors;
• Geographical areas, if applicable.

Page 113 ends

City of Fountain Valley, CA Page 19
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
For systematic re-inspections, this could be due to noticed trends such as specific treatment types (e.g. open-graded mixed), a specific inspector or geographical area. In these cases Bucknam continues to utilize a 10% re-inspection policy.
e. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI’s calculated through the most recent inspections will be compared to previous PCI’s. If the variance in PCI is greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or reinspection (In the cases that a PCI increases or decreases by 10 points follows the established CPMPG guidelines; Appendix A, page A-18).
f. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist the agency in submitting the following:
 Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years
 Local streets will be surveyed and reported on every six years  Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted every two years
g. Experience of Inspectors – Bucknam staff have been trained on the use of StreetSaver and the segment calibration/verification and inspection practices. Mr. Peter Bucknam (Project Manager) has completed the MicroPAVER Certification of Professional Development courses. All Bucknam field technicians are trained using the ASTM D6433 survey methodologies and have passed OCTA’s prequalification testing every year since 2010. Bucknam Infrastructure Group inspectors have attended formal training on pavement condition distress surveys. This training was conducted prior to performing any work using the ASTM D6433 protocols, consistent with OCTA’s requirements.
h. Field data collection safety procedures – Bucknam field survey techniques utilize the following procedures:
a. All vehicles are properly marked or flagged with appropriate sign markings indicating that a “PAVEMENT SURVEY IS IN PROGRESS”
b. All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line-of-site warning c. Large MPAH routes are surveyed using two field technicians to increase traffic control warning and safety
d. While parking or stopping along the survey route, vehicles legally park within the rightof-way or use a parking lot e. All field technicians wear ANSI – 105 Class II safety vests

Page 114 ends

City of Fountain Valley, CA Page 20
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
XV. APPENDIX E – PAVEMENT MANAGEMENT DATA FILES
The City of Fountain Valley MicroPAVER database (.e70 file) has been enclosed for City and OCTA use.

This data and the associated reporting data includes:
• Street names and limits for the City’s public streets • Street identifiers (Branch ID, Section ID)
• Direction
• Begin and end of section
• Length, width and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• Pavement Condition Index (PCI) and date of inspection • Type of recommended treatment
• Cost of recommended treatment

Page 115 ends

City of Fountain Valley, CA Page 21
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – May 22, 2024
XVI. APPENDIX F – GIS MAPS / CURRENT CONDITIONS

Page 116 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: June 4, 2024
Members of the City Council
SUBJECT: Lease Amendments to Contracts 11-50 and 06-02 with the Boys and Girls Clubs of Huntington Valley

1. Approval of Amendment #6 to Contract 11-50 between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the Child Care Building (17565 Los Alamos)

2. Approval of Amendment #12 to Contract 06-02 between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the former Community Services Building (10200 Slater Avenue)

THREE-YEAR STRATEGIC GOAL
☐ Enhance the culture and environment of “A Nice Place to Live” ☐ Attract and retain revenue producing businesses
☐ Achieve fiscal stability in accordance with the 20-Year Financial Plan ☐ Attract and retain quality staff
☒ Not applicable
EXECUTIVE SUMMARY:

The current lease agreement between the City of Fountain Valley and the Boys and Girls Clubs of Huntington Valley (Clubs) for the former Community Services buildings located at 10200 Slater Avenue and the Child Care Building at located 17565 Los Alamos is set to expire on June 30, 2024.

Staff is recommending that the City Council approve Amendment #6 (Contract 11-50) and Amendment #12 (Contract 06-02) to the Lease Agreements, extending each lease for a period of 6 months commencing on July 1, 2024 and expiring on December 31, 2024.

The lease amendments reflect the current monthly lease payments, and applicable increases, in accordance with the January 1st Consumer Price Index (CPI) with a 3% increase cap. The amended lease provides the City and Clubs the right to terminate the lease without cause by giving the other party six months’ written notice of intention to terminate.

Page 117 ends

Lease Amendments with BGCHV
June 4, 2024

Page 2 ends

DISCUSSION:

The Boys and Girls Clubs have been current on their lease payments and have been responsible for maintenance, utilities, and insurance for each of their leased facilities directly adjacent to City Hall. The City has been responsible for the exterior landscaping and roof maintenance. Additionally, the Boys and Girls Club have shown to be tremendous partners with the community as they maintained and amended their services to support families throughout the pandemic.

The amendment includes extending the lease for a period of six (6) Months until December 31, 2024 and includes the annual CPI increase, not to exceed 3%.

FINANCIAL ANALYSIS
The lease amendment reflects the monthly payments, and applicable increases, in accordance with the January 1st CPI with a 3% increase cap. The lease amount for both buildings for calendar year 2024 are reflected below and have been adjusted for CPI (3.41%) on January 1, 2024 for calendar year 2024.
 In accordance with Contract 11-50 with the Boys & Girls Club of Huntington Valley your monthly lease payment is $7,303.90/month (Los Alamos / Child Care Building) for calendar year 2024.
 In accordance with Amendment No. 11 to Contract 06-02, your monthly lease payment is $6,797.81/month (Slater Building) for calendar year 2024.

ATTORNEY REVIEW:

The City Attorney has reviewed and approved Amendment #6 to contract 11-50 and Amendment #12 to contract 06-02 to the Lease Agreements and approved it to form.

ALTERNATIVES:

Alternative No.1: Approve Amendment #6 to Contract 11-50 between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the Child Care Building located at 18565 Los Alamos St.

Approve Amendment #12 to Contract 06-02Agreement between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the former Community Services Building (100200 Slater Avenue)
Alternative No. 2: Do not approve Amendment #6 to Contract 11-50 between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the Child Care Building located at 18565 Los Alamos St.

Do not approve Amendment #12 to Contract 06-02 Agreement between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the former Community Services Building (100200 Slater Avenue)

Page 118 ends

Lease Amendments with BGCHV
June 4, 2024

Page 3 ends

RECOMMENDATION:

Staff recommends approval of Amendment #6 to Contract 11-50 between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the Child Care Building located at 18565 Los Alamos St. and approval of Amendment #12 to Contract 06-02 between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the use of the former Community Services Building (10200 Slater Avenue).

Prepared By: Rob Frizzelle, Community Services Manager
Fiscal Review by: Ryan Smith, Finance Director
Approved By: Maggie Le, City Manager
Attachments:

1. Amendment No.6 to Lease Agreement 11-50

2. CON 11-50 Lease Agreement between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the Child Care Building

3. Amendment No. 12 to Lease Agreement 06-02

4. CON 06-02 Lease Agreement between the Boys and Girls Clubs of Huntington Valley and the City of Fountain Valley for the former Community Services Building

Page 119 ends

CONTRACT NO. 11-50
AMENDMENT NO. 6 TO

LEASE AGREEMENT

BETWEEN THE CITY OF FOUNTAIN VALLEY AND

THE BOYS AND GIRLS CLUBS OF HUNTINGTON VALLEY

FOR THE USE OF THE CHILD CARE FACILITY
LOCATED AT 17565 LOS ALAMOS STREET, FOUNTAIN VALLEY, CALIFORNIA THIS AGREEMENT is made and entered into this 4th day of June 2024 by and between the City of Fountain Valley (hereinafter CITY), a municipal corporation, and the Boys and Girls Clubs of Huntington Valley, (hereinafter CLUBS).

RECITALS
WHEREAS, CITY and CLUBS originally entered into a Lease Agreement for the former child care facility located at 17565 Los Alamos Street, Fountain Valley, California on September 1, 2011 attached hereto as Attachment “A” (Agreement); and WHEREAS, CITY and CLUBS entered into Amendment 1 on August 20, 2013 to extend the provisions of that original Lease Agreement until December 31, 2014; and WHEREAS, CITY and CLUBS entered into Amendment 2 on February 23, 2015 to extend the provisions of that original Lease Agreement until December 31, 2019; and WHEREAS, CITY and CLUBS entered into Amendment 3 on December 19, 2019 to extend the provisions of that original Lease Agreement until December 31, 2019; and WHEREAS, CITY and CLUBS entered into Amendment 4 on April 6, 2021, to extend the provisions of that original Lease Agreement until December 31, 2021; and WHEREAS, CITY and CLUBS entered into Amendment 5 to extend the provisions of that original Lease Agreement on a Month to Month basis; and WHEREAS, CITY and CLUBS entered into Amendment 6 on May 2, 2022, to extend the provisions of that original Lease Agreement until June 30, 2024; and WHEREAS, CLUBS has requested an extension to the original Agreement; and WHEREAS, CLUBS has proven itself as a responsible tenant; and WHEREAS, the parties do now desire to amend the Agreement accordingly;

Page 120 ends

CONTRACT NO. 11-50
NOW, THEREFORE, the parties hereto AGREE as follows:

1. The term provided in Section 1 of the Agreement is extended six (6) months beginning on July 1, 2024 and terminating on December 31, 2024.

2. That the lease payment amount as provided in Section 2 of the Agreement, shall increase annually by the CPI as of January 1 of each calendar year at an amount no greater than 3%. The web site currently used to determine CPI increases will be www.bls.gov/cpi/. In accordance with Contract 11-50 with the Boys & Girls Club of Huntington Valley your monthly lease payment is $7,303.90/month (Los Alamos / Child Care Building) for calendar year 2024.

3. In addition to the termination provisions set forth in Section 17, the parties agree to add a right to terminate without cause to be added as subsection (d):
“(c) CITY and CLUBS shall each have the right to terminate the lease without cause by giving the other party six months’ written notice of intention to terminate.”

4. The following CITY contact is changed in Section 18:

Rob Frizzelle, Community Services Director
City of Fountain Valley
10200 Slater Avenue
Fountain valley, CA 92708

5. Except as expressly modified herein, the terms and conditions of the Lease Agreement, as the same have been modified by amendments thereto, shall remain in effect.

In witness whereof, the parties hereto have entered into this Sixth Amendment the year first above written.

ATTEST: CITY OF FOUNTAIN VALLEY

____________________________ ______________________________ Deputy City Clerk Mayor
APPROVED AS TO FORM: BOYS AND GIRLS CLUBS OF
HARPER & BURNS LLP HUNTINGTON VALLEY:
______________________________ _______________________________ Attorneys for the City Chief Executive Officer

Page 121 ends

CONTRACT NO. 06-02
AMENDMENT NO. 12 TO

LEASE AGREEMENT

BETWEEN THE CITY OF FOUNTAIN VALLEY AND

THE BOYS AND GIRLS CLUBS OF HUNTINGTON VALLEY

FOR THE USE OF THE FORMER COMMUNITY SERVICES BUILDING
LOCATED AT 10200 SLATER, FOUNTAIN VALLEY, CALIFORNIA
THIS AGREEMENT is made and entered into this 4th day of June 2024 by and between the City of Fountain Valley (hereinafter CITY), a municipal corporation, and the Boys and Girls Clubs of Huntington Valley, (hereinafter CLUBS).

RECITALS
WHEREAS, CITY and CLUBS originally entered into a Lease Agreement for the former community services building located at 10200 Slater Avenue, Fountain Valley, California on January 1, 2006 attached hereto as Attachment “A” (Lease Agreement); and WHEREAS, CITY and CLUBS entered into Amendment 1 on July 17, 2007, to extend the provisions of that original Lease Agreement until December 31, 2008; and WHEREAS, CITY and CLUBS entered into Amendment 2 on December 2, 2008 to extend the provisions of that original Lease Agreement until December 31, 2009; and WHEREAS, CITY and CLUBS entered into Amendment 3 on December 17, 2009 to extend the provisions of that original Lease Agreement until December 31, 2010; and WHEREAS, CITY and CLUBS entered into Amendment 4 on December 21, 2010 to extend the provisions of that original Lease Agreement until December 31, 2011; and WHEREAS, CITY and CLUBS entered into Amendment 5 on December 20, 2011 to extend the provisions of that original Lease Agreement until December 31, 2012; and WHEREAS, CITY and CLUBS entered into Amendment 6 on February 5, 2013 to extend the provisions of that original Lease Agreement until December 31, 2013; and WHEREAS, CITY and CLUBS entered into Amendment 7 on February 4, 2014 to extend the provisions of that original Lease Agreement until December 31, 2014; and WHEREAS, CITY and CLUBS entered into Amendment 8 on February 23, 2015 to extend the provisions of that original Lease Agreement until December 31, 2019; and WHEREAS, CITY and CLUBS entered into Amendment 9 on December 17, 2019 to extend the provisions of that original Lease Agreement until December 31, 2020; and

Page 122 ends

CONTRACT NO. 06-02
WHEREAS, CITY and CLUBS entered into Amendment 10 on April 6, 2021 to extend the provisions of that original Lease Agreement until December 31, 2021; and WHEREAS, CITY and CLUBS entered into Amendment 11 to extend the provisions of that original Lease Agreement on a Month to Month basis; and WHEREAS, CITY and CLUBS entered into Amendment 12 on May 2, 2022, to extend the provisions of that original Lease Agreement until June 30, 2024; and WHEREAS, CLUBS has requested an extension to the lease agreement; and WHEREAS, CLUBS has proven itself as a responsible tenant; and WHEREAS, the parties do now desire to amend the Lease Agreement accordingly; NOW, THEREFORE, the parties hereto AGREE as follows:

1. The term provided in Section 1 of the Agreement is extended six (6) months beginning on July 1, 2024 and terminating on December 31, 2024.

2. That the lease payment amount as provided in Section 2 of the Agreement, shall increase annually by the CPI as of January 1 of each calendar year at an amount no greater than 3%. The web site currently used to determine CPI increases will be www.bls.gov/cpi/. In accordance with Amendment No. 11 to Contract 06-02, your monthly lease payment is $6,797.81/month (Slater Building) for calendar year 2024.

3. In addition to the termination provisions set forth in Section 16, the parties agree to add a right to terminate without cause to be added as subsection (c):
“(c) CITY and CLUBS shall each have the right to terminate the lease without cause by giving the other party six months’ written notice of intention to terminate.”

4. The following CITY contact is changed in Section 17:

Rob Frizzelle, Community Services Director
City of Fountain Valley
10200 Slater Avenue
Fountain valley, CA 92708

5. Except as expressly modified herein, the terms and conditions of the Lease Agreement, as the same have been modified by amendments thereto, shall remain in effect.
/
/
/

Page 123 ends

CONTRACT NO. 06-02
In witness whereof, the parties hereto have entered into this Twelfth Amendment the year first above written.

ATTEST: CITY OF FOUNTAIN VALLEY

____________________________ ______________________________ Deputy City Clerk Mayor
APPROVED AS TO FORM: BOYS AND GIRLS CLUBS OF
HARPER & BURNS LLP HUNTINGTON VALLEY:
______________________________ _______________________________ Attorneys for the City Chief Executive Officer

Page 124 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: June 4, 2024
Members of the City Council
SUBJECT: Annual Military Equipment Report per California Assembly Bill 481 Three-Year Strategic Goals
☐ Enhance the culture and environment of “A Nice Place to Live” ☐ Attract and retain revenue producing businesses
☐ Achieve fiscal stability in accordance with the 20-Year Financial Plan ☐ Attract and retain quality staff
☒ Not applicable
EXECUTIVE SUMMARY:

Assembly Bill 481 requires City Council approval of the Annual Military Equipment Report.

DISCUSSION:

On June 21, 2022, the City Council adopted Ordinance 1585 (Attachment 1), approving a Military Equipment Use Policy – Policy 707, pursuant to Assembly Bill 481 (“AB 481”). In accordance with AB 481 and Policy 707, a military equipment report must be submitted to the City Council annually for each type of military equipment approved within one year of authorization, and annually thereafter, for as long as the military equipment is available for use.

In compliance with AB 481, outlined below is the 2023 Annual Military Equipment Report and attached is the updated policy (Attachment 2).

Background
On September 30, 2021, AB 481 required law enforcement agencies to adopt a military equipment use policy (Policy 707) by ordinance, no later than May 1, 2022. The Fountain Valley Police Department complied with AB 481 and adopted Ordinance No. 1585 approving Policy 707.

AB 481 also requires law enforcement agencies to submit to the City Council an annual military equipment usage report (“Annual Report”) on the use of the equipment, any complaint(s) or concern(s) regarding the use of the equipment, results of any internal audits on the use of the equipment, the annual costs for the equipment, the quantity possessed by the agency and the intention to purchase additional equipment in the following year. In addition, within 30 days of submitting and publicly releasing the Annual Report, a well-publicized and community engagement meeting must be held to allow for public comments.

Page 125 ends

AB 481 Annual Military Equipment Report
June 4, 2024

Page 2 ends

To meet the requirements of the Annual Military Equipment Usage Report pursuant to AB 481 and Government Code § 7072, the annual report must include the following information for the immediately preceding calendar year for each type of military equipment:
 A summary of how the military equipment was used and its purpose;  A summary of any complaints or concerns received regarding the military equipment;  The results of any internal audits, any information about violations of the military equipment use policy, and any actions taken in response;  The total annual cost for each type of military equipment, including acquisition, personnel, training, transportation, maintenance, storage, upgrade, and other ongoing costs, and from what source funds will be provided for the military equipment in the calendar year following submission of the annual military equipment report;  The quantity possessed for each type of military equipment; and  If the law enforcement agency intends to acquire additional military equipment in the next year, the quantity sought for each type of military equipment.

Complaints or Concerns
All use of force incidents are reviewed by assigned supervisors and Watch Commanders. The supervisor for each use of force incident completes a supervisor’s report and provides a determination if the use of force was consistent or conflicts with Department policy. The supervisor’s report is reviewed by the Operations Bureau Lieutenant and Captain, and ultimately the Chief of Police, to ensure employees are performing their duties within guidelines set by Department policy and applicable law.

During 2023, no violations were discovered, and officers were found to be operating in a manner that met or exceeded Department and community expectations. As listed below in the use summary, Fountain Valley Police Department did not receive any complaints or concerns related to the use of military equipment.

Military Equipment Use in 2023
During 2023, the Fountain Valley Police Department utilized drones on seven (7) separate occasions for fatal and significant injury traffic investigations. The drones were used by operators who have completed the required training in adherence to the procedures set forth in the Government Code and Policy 707, Military Equipment. 2/26/23: Fatal Traffic Collison (DR #23-07048)
5/20/23: Fatal Traffic Collison (DR #23-17708)
7/04/23: Felony Hit and Run (DR #23-23269)
7/11/23: Injury Collison (DR #23-24079)
10/03/23: Fatal Traffic Collison (DR #23-34358)
11/10/23: Fatal Traffic Collison (DR #23-38850)
11/21/23: Fatal Traffic Collison (DR #23-40091)

Page 126 ends

AB 481 Annual Military Equipment Report
June 4, 2024

Page 3 ends

Equipment Purchases in 2023
In 2023, the Fountain Valley Police Department did not acquire additional types of military equipment other than additional ammunition, which required replenishment after being used in training environments. The ammunition needed to be replenished is included in the policy and attached inventory that was previously approved by the City Council.

Intention to Purchase Additional Equipment in 2024
Unmanned Aircraft System (UAS) – Drone
DJI Avata 2
Description: UAS with single-color camera, weighs approximately 377 grams and has video recording capabilities, approximately 23 minutes of flight time.

Quantity: 2
Purchase Price: $3,780
DJI Mavic 3 Thermal Enterprise
Description: UAS with tri-camera (wide, tele, thermal), weighs approximately 915 grams and has video recording capabilities, approximately 45 minutes of flight time.

Quantity: 2
Purchase Price: $15,946.30
Purpose: To be deployed when its view would assist officers or incident commanders in situations which include, but not limited to:
a) major collision investigations
b) search for missing persons
c) natural disaster management
d) crime scene photography
e) SWAT, tactical or other public safety and life preservation missions f) In response to specific requests from local, state, or federal fire authorities for fire response and/or prevention.

Authorized Use: Only assigned operators who have completed the required training shall be permitted to operate any UAS during approved missions.

Expected Life Span: All UAS equipment, 5 years

Page 127 ends

AB 481 Annual Military Equipment Report
June 4, 2024

Page 4 ends

Fiscal Impact: Annual maintenance and battery replacement cost is approximately $700.00.

Additional purchases for Fountain Valley Police Department in 2024 include additional ammunition and chemical agents which need to be replenished after being used in either the field or training environments. All items needing to be replenished are included in the policy and attached inventory that was previously approved by the City Council.

Department inventory and all costs associated with the use of this equipment is believed to be consistent with the military equipment inventory list, policy and Department budget previously approved by the City Council. It should be noted, these operating costs are good faith estimates that are subject to changes made by vendors and/or manufacturers based on variables related to availability, shipping and general market increases.

Public Hearing: Fountain Valley Police Department gives strong consideration to the public’s welfare, safety, civil rights and civil liberties. In a continued effort for greater transparency, the Department places high regard on meaningful public input related to the use of military equipment in our community.

Department policy requires Fountain Valley Police Department to hold at least one well publicized and conveniently located community engagement meeting where community members may discuss and ask questions regarding the annual military equipment report.

Meetings must be held within 30 days of posting this report on the Department website.

Fountain Valley Police Department will provide this opportunity on June 4, 2024, at 6:00 pm, during the City’s regularly scheduled City Council meeting.

In compliance with the requirements of AB 481, this staff report, which includes the Annual Report, and the updated policy were published on the Department’s website as of May 22, 2024.

FISCAL REVIEW:

There is no fiscal impact related to this item.

PUBLIC NOTIFICATION:

Public notification was made through the regular agenda process.

ATTORNEY REVIEW:

The Attorney(s) for the City has reviewed and concurs with the recommended action.

ALTERNATIVES:

Alternative No. 1: There are no reasonable alternatives that can achieve the same objectives of officer and civilian safety.

Page 128 ends

AB 481 Annual Military Equipment Report
June 4, 2024

Page 5 ends

RECOMMENDATION: Staff recommends City Council approve the Annual Military Equipment Report per Assembly Bill 481.

Prepared by: Jarrod Frahm, Lieutenant
Approved by: Matthew L. Sheppard, Chief of Police
Fiscal Review: Ryan Smith, Finance Director
Legal Review: Colin Burns, Attorney for the City
Approved by: Maggie Le, City Manager
Attachments:
 Ordinance 1585
 Policy 707, Military Equipment
 2023-2024 Military Equipment Inventory List

Page 129 ends
Page 130 ends
Page 131 ends

Policy
707
Fountain Valley Police Department
Fountain Valley PD Policy Manual
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 1
Military Equipment
707.1 PURPOSE AND SCOPE
The purpose of this policy is to provide guidelines for the approval, acquisition, and reporting requirements of military equipment (Government Code § 7070; Government Code § 7071; Government Code § 7072). This policy is provided to fulfill the obligations set forth in Assembly Bill No. 481. These obligations include but are not limited to seeking approval on specific items deemed to be military equipment and requirements related to compliance, annual reporting, cataloging, and complaints regarding these items.
707.1.1 DEFINITION OF MILITARY EQUIPTMENT
California Government Code § 7070 defines "military equipment" as including:
• Unmanned, remotely piloted, powered aerial or ground vehicles. • Mine-resistant ambush-protected (MRAP) vehicles or armored personnel carriers. • High mobility multipurpose wheeled vehicles (HMMWV), two-and-one-half-ton trucks, five-ton trucks, or wheeled vehicles that have a breaching or entry apparatus attached. • Tracked armored vehicles that provide ballistic protection to their occupants. • Command and control vehicles that are either built or modified to facilitate the operational control and direction of public safety units. • Weaponized aircraft, vessels, or vehicles of any kind. • Battering rams, slugs, and breaching apparatuses that are explosive in nature. This does not include a handheld, one-person ram.
• Firearms and ammunition of_.50 caliber or greater, excluding standard-issue shotguns and standard-issue shotgun ammunition.
• Specialized firearms and ammunition of less than_.50 caliber, including firearms and accessories identified as assault weapons in Penal Code § 30510 and Penal Code § 30515, with the exception of standard-issue firearms.
• Any firearm or firearm accessory that is designed to launch explosive projectiles. • Noise-flash diversionary devices and explosive breaching tools. • Munitions containing tear gas or OC, excluding standard, service-issued handheld pepper spray.
• TASER® Shockwave, microwave weapons, water cannons, and long-range acoustic devices (LRADs).
• Kinetic energy weapons and munitions.
• Any other equipment as determined by a governing body or a state agency to require additional oversight.

Page 132 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 2
707.2 POLICY
It is the policy of the Fountain Valley Police Department that members of this department comply with the provisions of Government Code § 7071 with respect to military equipment. It is the policy of the Fountain Valley Police Department that there are legally enforceable safeguards, including transparency, oversight, and accountability measures in place to protect the public's welfare, safety, civil rights, and civil liberties before military equipment is funded, acquired, or used. 707.3 MILITARY EQUIPMENT COORDINATOR
The Chief of Police designates the Support Services Bureau Lieutenant to act as the military equipment coordinator. The responsibilities of the military equipment coordinator include but are not limited to:
(a) Acting as liaison to the governing body for matters related to the requirements of this policy.
(b) Identifying department equipment that qualifies as military equipment in the current possession of the Department, or the equipment the Department intends to acquire that requires approval by the governing body.
(c) Conducting an inventory of all military equipment at least annually. (d) Collaborating with any allied agency that may use military equipment within the jurisdiction of Fountain Valley Police Department (Government Code § 7071). (e) Preparing for, scheduling, and coordinating the annual community engagement meeting to include:

1. Publicizing the details of the meeting.

2. Preparing for public questions regarding the department's funding, acquisition, and use of equipment.
(f) Preparing the annual military equipment report for submission to the Chief of Police and ensuring that the report is made available on the department website (Government Code § 7072).
(g) Establishing the procedure for a person to register a complaint or concern, or how that person may submit a question about the use of a type of military equipment, and how the Department will respond in a timely manner.
707.4 MILITARY EQUIPMENT USE CONSIDERATIONS
The military equipment acquired and authorized by the Department is:
(a) Necessary because there is no reasonable alternative that can achieve the same objective of officer and civilian safety.
(b) Reasonably cost effective compared to available alternatives that can achieve the same objective of officer and civilian safety.

Page 133 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 3
Military equipment shall only be used by a Department employee after applicable training, including any course required by the Commission on Peace Officer Standards and Training (POST), has been completed, unless exigent circumstances arise. 707.5 MILITARY EQUIPMENT REPORTING CONSIDERATIONS
Upon approval of a military equipment policy, the Chief of Police or the authorized designee should submit a military equipment report to the City Council for each type of military equipment approved within one year of approval, and annually thereafter for as long as the military equipment is available for use (Government Code § 7072).

The Chief of Police or the authorized designee should also make each annual military equipment report publicly available on the department website for as long as the military equipment is available for use. The report shall include all information required by Government Code § 7072 for the preceding calendar year for each type of military equipment in department inventory.

The annual military equipment report shall, at a minimum, include the following information for the immediately preceding calendar year for each type of military equipment:
(a) A summary of how the military equipment was used and the purpose of its use. (b) A summary of any complaints or concerns received concerning the military equipment. (c) The results of any internal audits, any information about violations of the military equipment use policy, and any actions taken in response. (d) The total annual cost for each type of military equipment, including acquisition, personnel, training, transportation, maintenance, storage, upgrade, and other ongoing costs, and from what source funds will be provided for the military equipment in the calendar year following submission of the annual military equipment report. (e) The quantity possessed for each type of military equipment. (f) If the Department intends to acquire additional military equipment in the next year, the quantity sought for each type of military equipment.

Within 30 days of submitting and publicly releasing an annual military equipment report, the Department shall hold at least one well-publicized and conveniently located community engagement meeting, at which the general public may discuss and ask questions regarding the annual military equipment report and Fountain Valley Police Department's funding, acquisition, or use of military equipment. This shall occur as a part of the Department's presentation to the City Council.
707.6 CATALOGING OF MILITARY USE EQUIPMENT
All military use equipment kept and maintained by the Fountain Valley Police Department shall be cataloged in a way which addresses each of the following requirements:

1. The manufacturer's description of the equipment.

2. The capabilities of the equipment.

Page 134 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 4

3. The purposes and authorized uses for which the Department proposes to use the equipment.

4. The expected lifespan of the equipment.

5. The fiscal impact of the equipment, both initially and for on-going maintenance.

6. The quantity of the equipment, whether maintained or sought. 707.7 COMPLIANCE
All supervisors will ensure that all Department members comply with this policy and the Support Services Bureau Lieutenant will conduct an annual audit. The Chief of Police or designee will be notified of any policy violations and, if needed, the violation(s) will be handled in accordance with Policy 1009 (Personnel Complaints). Any member of the public can register a question or concern regarding military use equipment by contacting the Fountain Valley Police Department via telephone, (714) 593-4485.A response to the question or concern shall be completed by the Department in a timely manner.

Any member of the public can submit a complaint to any member of the Department and in any form (i.e., in person, telephone, email, etc.). Once the complaint is received, it shall be in accordance with the Personnel Complaints Policy.
707.8 FUNDING
The Department shall obtain City Council approval, by an ordinance adopting a new or revised military equipment use policy, prior to seeking funds for military equipment, including, but not limited to, applying for a grant, soliciting, or accepting private, local, state, or federal funds, in-kind donations, or other donations or transfers.

The Department has authority to apply for funding prior to obtaining City Council approval in the case of exigent circumstances.In such case, the Department shall obtain City Council approval as soon thereafter as practicable.In seeking such approval, the Support Services Bureau Lieutenant will submit to the City Council a report explaining the nature of the exigency and why prior approval could not be obtained.
707.9 MILITARY EQUIPMENT INVENTORY
The following constitutes an inventory of previously purchased equipment for the Fountain Valley Police Department deemed to be military and militaristic as defined by this policy.

1. Unmanned Aircraft System (UAS)
A UAS is an unmanned aircraft and the equipment necessary for the safe and efficient operation of the aircraft. An unmanned aircraft is a component of a UAS. It is defined by statute as an aircraft that is operated without the possibility of direct human intervention from within or on the aircraft.

Page 135 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 5
Current Inventory:

Autel EVO II Pro
Description: UAS with a single-color camera, weighs approx. 2.6 pounds and has video recording capabilities, approx. 40 minutes of flight time.

Quantity: 1
Purchase Price: $2,447.00
DJI Mini 2
Description: UAS that has a color camera. Capable of video recording and weighs 242 grams, approx. 30 minutes of flight time.

Quantity: 1
Purchase Price: $625.00
DJI Avanta 2
Description: UAS with single-color camera, weighs approx. 377 grams and has video recording capabilities, approx. 23 minutes of flight time.

Quantity: 2
Purchase Price: $15,946.30
DJI Mavic 3 Thermal Enterprise
Description: UAS with tri-camera (wide, tele, thermal), weighs approx. 915 grams and has video recording capabilities, approx. 45 minutes of flight time.

Quantity: 2
Purchase Price: $14,000.00
Purpose: To be deployed when its view would assist officers or incident commanders in situations which include but not limited to:

Page 136 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 6
(a) major collision investigations
(b) search for missing persons
(c) natural disaster management
(d) crime scene photography
(e) SWAT, tactical or other public safety and life preservation missions (f) In response to specific requests from local, state, or federal fire authorities for fire response and/or prevention.

Authorized Use: Only assigned operators who have completed the required training shall be permitted to operate any UAS during approved missions.

Expected Life Span: All UAS equipment, 3-5 years.

Fiscal Impact: Annual maintenance and battery replacement cost is approximately $700.00.

Training Required: All Department UAS operators are licensed by the Federal Aviation Administration for UAS operation. In addition, each operator must attend a 40-hour department training and ongoing quarterly training.

Legal and Procedural Rules: Use is established under Policy 606, FAA Regulation 14 CFR Part 107, and the City of Fountain Valley UAS policy. It is the policy of the Fountain Valley Police Department to utilize UAS only for official law enforcement purposes, and in a manner that respects the privacy of our community, pursuant to State and Federal law.

2. Distraction Devices
A device used to distract dangerous persons.

Current Inventory:

COMBINED TACTICAL SYSTEMS (CTS), MODEL 7290 FLASH BANG
Description: This is the standard diversionary flash-bang device.It is non-bursting, nonfragmenting single use device that produces a 175db and 6-8 million candela of light output.It is ideal for distracting potentially dangerous suspects during assaults, hostage rescue, building/room entry or other high-risk arrest situations.

Quantity: 18
Purchase Price: $45 each
Purpose: A distraction device is ideal for distracting dangerous suspects during assaults, hostage rescue, room entry or other high-risk arrest situations. It produces atmospheric overpressure and brilliant white light and, as a result, can cause short-term (6 - 8 seconds) physiological/psychological sensory deprivation to give officers a tactical advantage.

Authorized Use: Diversionary Devices shall only be used:

Page 137 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 7
(a) By officers who have been trained in their proper use. (b) In hostage and barricaded subject situations.
(c) In high-risk warrant (search/arrest) services where there may be extreme hazards to officers.
(d) During other high-risk situations where their use would enhance officer safety. (e) During training exercises.

Expected Lifespan: 5 years.

Fiscal Impact: No annual maintenance.

Training: Prior to use, officers must attend diversionary device training that is conducted by POST certified instructors.

Legal and Procedural Rules: Use is established under West County SWAT policy and procedure. It is the policy of SWAT to utilize diversion devices only for official law enforcement purposes, and pursuant to State and Federal law regarding the use of force.

3. 40 MM Launchers and Rounds
40MM Launchers are utilized by department personnel as a less lethal tool to launch impact rounds.

Current Inventory:

LMT DEFENSE TECHNOLOGY, 40MM SINGLE SHOT LAUNCHER
Description: The 40MM Single Launcher is a tactical single shot launcher that features an collapsible stock and picatinny upper receiver optic/light rail. It will fire standard 40mm less lethal ammunition, up to 4.8 inches in cartridge length. It will launch a 40mm less lethal round up to approximately 131 feet and is only authorized to be used by personnel who have attended a POST approved Less Lethal course.

Quantity: 3
Purchase Price: $900 each
DEFENSE TECHNOLOGY, 40MM EXACT IMPACT SPONGE
Description: A less lethal 40mm lightweight plastic and foam projectile fired from a single or multi-round purpose built 40mm grenade launcher with a rifled barrel at 325 FPS.

The 30-gram foam projectile delivers 120 ft/lbs. of energy on impact. The 40mm Exact Impact Sponge Round provides accurate and effective performance when fired from the approved distance of not less than five (5) feet and as far as 131 feet from the target.

Quantity: 83
Purchase Price: $18 each
DEFENSE TECHNOLOGY, 40MM DIRECT IMPACT CS

Page 138 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 8
Description: A less lethal 40mm lightweight plastic and crushable foam projectile fired from a single or multi-round purpose-built 40mm grenade launcher with a rifled barrel at 295 FPS. The 39-gram crushable foam projectile delivers 120 ft/lbs. of energy upon impact in addition to dispersion of 5 grams of OC irritant. The 40mm Direct Impact OC Round provides accurate and effective performance when fired from the approved distance of not less than five (5) feet and as far as 120 feet from the target.

Quantity: 10
Purchase Price: $30 each
Purpose: To limit the escalation of conflict where employment of lethal force is prohibited or undesirable.

Authorized Use: Situations for use of the less lethal weapon systems may include, but are not limited to:
(a) Self-destructive, dangerous and/or combative individuals. (b) Riot/crowd control and civil unrest incidents.
(c) Circumstances where a tactical advantage can be obtained. (d) Potentially vicious animals.
(e) Training exercises or approved demonstrations.

Training: Sworn members utilizing 40mm less lethal chemical agents or impact rounds are trained in there use by POST certified less lethal and chemical agent instructors.

Expected Life Span: Defense Technology Launchers - 25 years, Rounds - 5 years.

Fiscal Impact: Annual maintenance is approximately $50 for each launcher.

Legal and Procedural Rules: Use is established under Policy 302.9. It is the policy of the Fountain Valley Police Department to utilize the 40mm only for official law enforcement purposes, and pursuant to State and Federal law, including those regarding the use of force.

4. Less Lethal Shotgun: Less Lethal Shotgun is used to deploy the less lethal 12-gauge SuperSock Beanbag Round.

REMINGTON 870 LESS LETHAL SHOTGUN
Description: The Remington 870 Less Lethal Shotgun is used to deploy the less lethal 12-gauge Super-Sock Beanbag Round up to a distance of 75 feet. The range of the weapon system helps to maintain space between officers and a suspect reducing the immediacy of the threat which is a principle of De-escalation.

Quantity: 35
Purchase Price: $946 each
Drag Stabilized 12-GAUGE BEANBAG ROUND

Page 139 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 9
Description: A less lethal 2.4-inch 12-gauge shotgun round firing a ballistic fiber bag filled with 40 grams of lead shot at a velocity of 270-290 feet per second (FPS).

Drag Stabilized rounds are discharged from a dedicated 12-gauge shotgun that is distinguishable by a grey butt stock and fore grip. This round provides accurate and effective performance when fired from the approved distance of not fewer than five (5) feet. The maximum effective range of this munition is up to 75 feet from the target. The Drag Stabilized Model is in its deployed state immediately upon exiting the barrel. It does not require a minimum range to "unfold" or "stabilize." The Drag Stabilized Model is an aerodynamic projectile. However, accuracy is relative to the shotgun, barrel length, environmental conditions, and the operator. The Drag Stabilized Model is very accurate.

However, effectiveness depends on many variables, such as distance, clothing, stature, and the point where the projectile impacts.

Quantity: 460
Purchase Price: $5 each
Purpose: To limit the escalation of conflict where employment of lethal force is prohibited or undesirable.

Authorized Use: Situations for use of the less lethal weapon systems may include, but are not limited to:
(a) Self-destructive, dangerous and/or combative individuals. (b) Riot/crowd control and civil unrest incidents.
(c) Circumstances where a tactical advantage can be obtained. (d) Potentially vicious animals.
(e) Training exercises or approved demonstrations.

Expected Life Span: Remington 870 Less Lethal Shotgun- 25 years, Drag Stabilized 12-Gauge beanbag round and Winchester slug rifle rounds - no listed expiration date.

Fiscal Impact: Annual maintenance is approximately $50 for each less-lethal shotgun.

Training: All officers are trained in the 12 gauge less lethal shotgun as a less lethal option by in-service training. SWAT personnel receive additional training internally when they transfer to the unit. SWAT operators who utilize these munitions have been through and successfully completed a POST approved gas school and/or trained in house by POST certified chemical agent instructors for muzzle blast training.

Legal and Procedural Rules: Use is established under Policy 302.9 It is the policy of the Fountain Valley Police Department to utilize the less lethal shotgun only for official law enforcement purposes, and pursuant to State and Federal law, including those regarding the use of force.

Current Inventory:

Page 140 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 10
DANIEL DEFENSE DDM4.223
Description: lightweight, magazine-fed, gas-operated semi-automatic rifle. Caliber 223, 16-inch barrel.

Quantity: 23
Purchase Price: $2,057.00 per firearm
DANIEL DEFENSE AR-15.223 SHORT BARRELED RIFLE (SBR)
Description: lightweight, magazine-fed, gas-operated automatic rifle. Caliber 223, 11.5- inch barrel.

Quantity: 5
Purchase Price: $2,057.00 per firearm
COLT M16.223
Description: lightweight, magazine-fed, gas-operated semi-automatic rifle. Caliber 223,

14.5-inch barrel.

Quantity: 2
Purchase Price: $2,057.00 per firearm
WINCHESTER.223 REMINGTON 55GR FULL METAL JACKET FRANGIBLE RIFLE ROUND
Description:.223 Remington caliber, Frangible, 55 grain bullet weight, brass cartridge case material.

Quantity: 2,200
Purchase Price: $169.00 (price per 500)
WINCHESTER RANGER.223 55GR (PSP) RIFLE ROUND
Description:.223 caliber, Pointed Soft Point (PSP), 55 grain bullet weight, brass cartridge case material.

Quantity: 9,200
Purchase Price: $297.44 (price per 500)
Purpose: To be used as precision weapons to address a threat with more precision and/ or greater distances than a handgun, if present and feasible.

Authorized Use: Only members that are POST certified are authorized to use a rifle.

Expected Life Span: 25 years.

Fiscal Impact: Annual maintenance is approximately $50 for each rifle.

Page 141 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 11
Training: Prior to using a rifle, officers must be certified by POST instructors in the operation of the rifle. Additionally, all members that operate any rifle are required to pass a range qualification two times a year.

Legal and Procedural Rule: Use is established under Policy 303.3.2. It is the policy of the FVPD to utilize rifles only for official law enforcement purposes, and pursuant to State and Federal law regarding the use of force.

5. PepperBall launcher: A device that discharges irritant projectiles Current Inventory:

PEPPERBALL TAC SF LAUNCHER
Description: A compressed-air powered launcher designed to fire non-lethal PepperBall projectiles.

Quantity: 2
Purchase Price: $1,300.00 each

PEPPERBALL LIVE-X PROJECTILE
Description: The Live Projectile contains a concentrated amount of PAVA pepper powder. One round of LIVE-X contains the equivalent to 10 PepperBall rounds.

Discharged from a PepperBall Launcher, the projectile has a velocity of 280-350 FPS.

The projectile has a direct impact of 60ft and an area of saturation of 150+ft. The projectile contains 5% PAVA Powder.

Quantity: 465
Purchase Price: $3.00 per projectile

PEPPERBALL GLASS BREAKING PROJECTILE
Description:The Glass Breaking Projectile is a solid polymer projectile used breaking out residential windows and side-glass of automobiles.The projectiles are not intended for use on humans or animals.

Quantity:10
Purchase Price:$2.00 per projectile
Purpose: To limit the escalation of conflict where employment of lethal force is prohibited or undesirable. Situations for use of the less lethal weapon systems may include but are not limited to:

Page 142 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 12
(a) Self-destructive, dangerous and/or combative individuals (Exception - Glass Breaking Projectile).
(b) Riot/crowd control and civil unrest incidents (Exception - Glass Breaking Projectile). (c) Circumstances where a tactical advantage can be obtained. (d) Potentially vicious animals (Exception - Glass Breaking Projectile). (e) Training exercises or approved demonstrations.

Authorized Use: Only those officers who have been trained in the use of PepperBall launchers are authorized to use the PepperBall launchers.

Training: Sworn members utilizing PepperBall launchers and projectiles are trained in there use by POST certified less lethal and chemical agent instructors.

Expected Life Span:
(a) PepperBall Tac SF Launcher - 20 years
(b) PepperBall Live-X Projectile - 3 years
(c) PepperBall Glass Breaker – 3 years
Fiscal impact: Annual maintenance is approximately $50 for each PepperBall launcher.

Legal and Procedural Rules: Use is established under Policy 302.3. It is the policy of the FVPD to utilize PepperBall only for official law enforcement purposes, and pursuant to State and Federal law, including those regarding the use of force. 707.10 MILITARY SWAT EQUIPMENT INVENTORY (REGIONALIZED EQUIPMENT NOT IN

POSSESSION OF THE FOUNTAIN VALLEY POLICE DEPARTMENT)
The Fountain Valley Police Department participates in the West County Special Weapons and Tactics (SWAT) team, a regional SWAT and Crisis Negotiation Team (CNT) with Officers from the cities of Seal Beach, Los Alamitos, Cypress, and Westminster.

The following constitutes an inventory of previously purchased equipment known to be owned and/ or utilized by law enforcement units with which the Fountain Valley Police Department collaborates and/or participates for law enforcement purposes, which are deemed to be military and militaristic as defined by this policy. The equipment in this section is primarily used by the members of the West County SWAT Team.

6. Armored Vehicles
Commercially produced wheeled armored personnel vehicle utilized for law enforcement purposes.

Current Inventory:

LENCO BEARCAT G2

Page 143 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 13
Description: Armored vehicle that seats 10-12 personnel with open floor plan that allows for rescue of down personnel. It can stop various projectiles, which provides greater safety to citizens and officers beyond the protection level of shield and personal body armor.

The bearcat was obtained through the UASI group procurement process in 2012, VIN FDAF5HT2BEC98082. The vehicle is currently stored at Westminster Police Department and used by the West County S.W.A.T. during training and S.W.A.T. operations for the region.

Quantity: 1
Purchase Price: (Refer to Westminster Police Department) Purpose: To be used in response to critical incidents to enhance officer and community safety, improve scene containment and stabilization, and assist in resolving critical incidents.

Authorized Use: The use of armored vehicles shall only be authorized by a watch commander or SWAT commander, based on the specific circumstances of a given critical incident.

Armored vehicles shall be used only by officers trained in their deployment and in a manner consistent with Department policy and training.

Expected Lifespan: 25 years.

Fiscal Impact: (Refer to Westminster Police Department).

Training: All driver/operators shall attend formalized instruction and be trained in vehicle operations and practical driving instruction.

Legal and Procedural Rules: It is the policy of the Department to utilize armored vehicles only for official law enforcement purposes, and pursuant to State and Federal law.

Other Notes: The bearcat was obtained through the UASI group procurement process in 2012. The vehicle is currently stored at Westminster Police Department and used by the West County SWAT during training and SWAT operations for the region.

7. MOBILE COMMAND POST VEHICLE (MCP)
A vehicle used mobile office that provides shelter, access to Department computer systems, and restroom facilities during extended events.

Current Inventory:

FREIGHTLINER M2 106 VEHICLE
Description: The MCP can also be utilized for SWAT/CNT and other critical incidents, preplanned large events, searching for missing persons, natural disasters, and community events. After the City of Anaheim UASI group completed the procurement process and the vehicle was built, the City of Cypress took delivery of the MCP on April 19, 2007. The City of Cypress entered into an agreement with the cities of Los Alamitos and Seal Beach to accept, house, utilize and cost-share repairs and routine maintenance for the regional MCP vehicle. The vehicle is currently housed inside a City of Seal Beach fire station (OCFA station

Page 144 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 14
#48) and is utilized by all three cities for special events that include DUI checkpoints, public relations presentations, and emergency incidents. The vehicle is also the primary command and control platform for West County S.W.A.T. during training and S.W.A.T. operations for the region. The vehicle is staffed with a team of City employees and designated volunteers from all three cities including the West Cities Police Dispatch Communications Center. Costsharing for the vehicle is administered by the Cypress Finance Department and each city is billed a third of costs associated with the annual vehicle maintenance and technology service fees.

Quantity: 1
Purchase Price: (Refer to Cypress Police Department)
Purpose: To be used based on the specific circumstances of a given critical incident, large event, natural disaster, or community event that is taking place.

Authorized Use: Only officers trained in their deployment and operations in a manner consistent with Department policy and training are authorized to operate the MCP.

Furthermore, only officers who have completed the California State Class B Commercial driving school and become properly licensed will be allowed to drive the MCP. Situations which the MCP is authorized for use would include but not be limited to critical incidents, emergencies, and natural disasters.

Expected Lifespan: The MCP, 20-year lifespan on chassis and vehicle structure. Upgrades needed in 7 years to maintain IT systems.

Fiscal Impact: Annual maintenance cost is approximately $1,000. Cost-sharing for the vehicle is administered by the Cypress Finance Department and each city is billed a third of costs associated with the annual vehicle maintenance and technology service fees.

Training: The driver/operator shall receive training in the safe handling of the vehicle on a closed training course. Once the operator has shown competence in vehicle handling, the driver/operator will drive the vehicle throughout the city with an experienced driver. Driver/ operators shall also undergo California Department of Motor Vehicles commercial vehicle testing.

Legal and Procedural Rules: It is the policy of the Department to use the MCP only for official law enforcement purposes, and in accordance with California State law regarding the operation of motor vehicles.

Other Notes: After the City of Anaheim UASI group completed the procurement process and the vehicle was built, the City of Cypress took delivery of the MCP on April 19, 2007. The City of Cypress entered into an agreement with the cities of Los Alamitos and Seal Beach to accept, house, utilize and cost-share repairs and routine maintenance for the regional MCP vehicle. The vehicle is currently housed inside a City of Seal Beach fire station (OCFA station #48) and is utilized by all three cities for special events that include DUI checkpoints, public relations presentations, and emergency incidents. The vehicle is also the primary command

Page 145 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 15
and control platform for West County S.W.A.T. during training and S.W.A.T. operations for the region. The vehicle is staffed with a team of City employees and designated volunteers from all three cities including the West Cities Police Dispatch Communications Center. Costsharing for the vehicle is administered by the Cypress Finance Department and each city is billed a third of costs associated with the annual vehicle maintenance and technology service fees.

8. Chemical Agent and Smoke Canisters
Canisters that contain chemical agents that are released when deployed.

Quantity: (Refer to Cypress Police Department)
Purchase Price: (Refer to Cypress Police Department)
Purpose: To limit the escalation of conflict where employment of lethal force is prohibited or undesirable. Situations for use of the less lethal weapon systems may include, but are not limited to:

1. Self-destructive, dangerous and/or combative individuals.

2. Riot/crowd control and civil unrest incidents.

3. Circumstances where a tactical advantage can be obtained.

4. Potentially vicious animals.

5. Training exercises or approved demonstrations.

Authorized Use: Only officers who have received POST certification in the use chemical agents are authorized to use chemical agents.

Training: Sworn members utilizing chemical agent canisters are certified by POST less lethal and chemical agent instructors.

Expected Lifespan: 5 years from manufacturing date.

Fiscal Impact: No annual maintenance.

Legal and Procedural Rules: The use of chemical agents only for official law enforcement purposes, and pursuant to State and Federal law, including those regarding the use of force.

Other Notes: This equipment is owned and operated by Cypress Police Department and used by the West County SWAT during training and SWAT operations for the region which could result in its deployment and/or use in the City of Fountain Valley.

9. Explosive Breaching Tools
Tools that are used to conduct an explosive breach.

Current Inventory:

KINETIC BREACHING TOOL (KBT) MODEL 3-1000

Page 146 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 16
Description: The KBT is a powder actuated kinetic energy forced entry tool.It utilizes a crimped blank explosive charge which drives a captive steel impact plate directed at the breach point.The impact plate extends forward out of the clamshell shroud and impacts against the target with a high level of kinetic energy to defeat the entry point or fortification.The impact plate automatically retracts and is reset in the breaching device.The KBT uses semiautomatic cycling, allowing repeated strikes on hardened or multiple targets.The KBT's intended use is for forced entry during high-risk operations with secure entry points and is designed to be operated by a single officer/tactical team member. The KBT weighs 28 lbs. dimensions are 35in. x 9.9in. x 9.3in. and has an audible report of 115dB. The KBT utilizes a proprietary blank cartridge to deliver up to 850ft. lbs. of kinetic energy through the steel ram.There is no projectile or explosive energy that leaves the device except for the force of the ram, which is permanently captured in the breaching device.

Quantity: 1
Purchase Price: (Refer to the Seal Beach Police Department) Purpose: To safely gain entry into a structure.

Authorized Use: Explosive breaching may only occur after authorization by the Incident Commander or SWAT Commander in the field, and during training exercises.

Expected Lifespan: Kinetic Breaching Tool (KBT) - 30 years. Blank cartridges – 5 years (preferably rotate rounds within 1 year).

Fiscal Impact: No annual maintenance.

Training: All officers who use explosive breaching tools shall attend 40 hours of POST certified explosive breaching instruction and must additionally receive quarterly training for explosive operations.

Legal and Procedural Rules: It is the policy of the Fountain Valley Police Department to utilize breaching tools only for official law enforcement purposes, and pursuant to State and Federal law.

Other Notes: This equipment is owned and operated by Seal Beach Police Department and used by the West County SWAT during training and SWAT operations for the region which could result in its deployment and/or use in the City of Fountain Valley.

10. Long Range Acoustic Device (LRAD)
A high intensity directional acoustical array for long-range, crystal-clear hailing, notification, and an unmistakable warning tone. The LRAD is primarily used as a communication device.

Current Inventory:

GENASYS LONG-RANGE ACOUSTIC DEVICE (LRAD) MODEL 500X
Description: The Genasys Long-Range Acoustic Device (LRAD) is a public address system optimized to the primary range of hearing. The LRAD system can deliver a live or recorded

Page 147 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 17
voice message with clarity for any operational scenario. LRAD's advanced driver and waveguide technology ensures every broadcast is clearly heard and understood, even above crowd, engine, and background noise. The LRAD 500X is compact, lightweight, and designed for applications ranging from fixed security installations to vehicles and vessels. The 500X is easily mounted and transportable to provide law enforcement long-range communication and safe, scalable non-kinetic escalation of force. The audible range of the LRAD 500X can reach up to 6,561 ft. American Technology Corp. Serial Number: 05984 UASI ASAUA/DHS Number 11-00456.

Quantity: 1
Purchase Price: (Refer to the Westminster Police Department) Purpose: To be used to issue dispersal orders during crowd and riot control situations or to address the public in the event of civil emergencies, natural disasters, evacuations, and police incidents (e.g., missing persons, perimeters for wanted suspects/ K9 deployments, etc.). The LRAD may also be used to issue a warning tone.

Authorized Use: LRAD use may only occur after the authorization of the Incident Commander or SWAT Commander in the field and/or during training exercises by personnel trained to operate the LRAD.

Expected Lifespan: 25 years with proper maintenance
Fiscal Impact: No annual maintenance.

Training: All officers trained in the use of the LRAD should set up and operate the device.

Legal and Procedural Rules: It is the policy of the Seal Beach Police Department to utilize the Long-Range Acoustic Device (LRAD) only for official law enforcement purposes, and pursuant to State and Federal Law.

Other Notes: This equipment is owned and operated by West County SWAT through the Westminster Police Department, which could result in its deployment and/or use in the City of Fountain Valley.

11. Robots
A remotely controlled unmanned machine that operates on the ground, which is utilized to enhance the safety of the community and officers.

Current Inventory:

TRANSCEND VANTAGE PATROL ROBOT
Description: Transcend's Vantage robot is the world's only double-patented automatic stair and obstacle climbing robot for First Responders. It's the only option for First Responders that want their robot to "just figure it out" on the first attempt to climb stairs, clothes, and junk without the burden of tedious manual controls associated with flippers and other limb systems. This means the Vantage can be used without prior training to enter a

Page 148 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 18
house or building to see, hear and learn what's happening before sending officers inside.

Cameras: Drive Camera (Night Vision), Pan Tilt Zoom (25x zoom, 90/15 degree up/down tilt, auto infrared night vision), FLIR Thermal. 3 hours constant driving, 12 hours monitoring / intermittent driving. 100+ lb. payload, zero degree turning radius, two-way audio (push to talk), key ignition, easy battery swapping (robot and controller).

Quantity: 1
Purchase Price: (Refer to the Westminster Police Department) Purpose: To be used to remotely gain visual/audio data, deliver HNT phone, open doors, disrupt packages, and clear buildings.

Authorized Use: Only assigned operators who have completed the required training shall be permitted to operate the robot(s) identified above. Use is established by the Bomb Squad Commander or Incident Commander.

Expected Lifespan: 8 to 10 years.

Fiscal Impact: Annual maintenance and battery replacement cost is approximately $500.

Training: All robot operators must complete the FBI's 6-week hazardous device school prior to operating the robot(s) identified above.

Legal and Procedural Rules: It is the policy of the FVPD to utilize a robot only for official law enforcement purposes, and in a manner that respects the privacy of our community, pursuant to State and Federal law.

Other Notes: This equipment is owned and operated by West County SWAT through the Westminster Police Department, which could result in its deployment and/or use in the City of Fountain Valley.
707.11 APPROVAL
The Chief of Police or the authorized designee shall obtain approval from City Council by way of an ordinance adopting the military equipment policy. As part of the approval process, the Chief of Police or the authorized designee shall ensure the proposed military equipment policy is submitted to City Council and is available on the department website at least 30 days prior to any public hearing concerning the military equipment at issue (Government Code § 7071). The military equipment policy must be approved by City Council prior to engaging in any of the following (Government Code § 7071):
(a) Requesting military equipment made available pursuant to 10 USC § 2576a. (b) Seeking funds for military equipment, including but not limited to applying for a grant, soliciting or accepting private, local, state, or federal funds, in-kind donations, or other donations or transfers.
(c) Acquiring military equipment either permanently or temporarily, including by borrowing or leasing.

Page 149 ends

Fountain Valley Police Department
Fountain Valley PD Policy Manual
Military Equipment
Copyright Lexipol, LLC 2024/05/06, All Rights Reserved.

Published with permission by Fountain Valley Police
Department
***DRAFT*** Military Equipment - 19
(d) Collaborating with another law enforcement agency in the deployment or other use of military equipment within the jurisdiction of this department. (e) Using any new or existing military equipment for a purpose, in a manner, or by a person not previously approved by the governing body.
(f) Soliciting or responding to a proposal for, or entering into an agreement with, any other person or entity to seek funds for, apply to receive, acquire, use, or collaborate in the use of military equipment.
(g) Acquiring military equipment through any means not provided above. 707.12 COORDINATION WITH OTHER JURISDICTIONS
Military equipment used by any member of this Department shall be approved for use and in accordance with this Department policy. Military equipment used by other jurisdictions that are providing mutual aid to this Department shall comply with their respective military equipment use policies in rendering mutual aid.
707.13 MAINTENANCE OF MILITARY USE SUPPLY LEVELS
When stocks of military equipment have reached significantly low levels or have been exhausted, the Department may order up to 10% of stock in a calendar year without City Council approval to maintain essential availability for the Department's needs. Fountain Valley Police Department is authorized to acquire additional stock of items listed here from other law enforcement agencies of California Office of Emergency Services (Cal OES) in the event of an emergency when approved by the Chief of Police or designee.

Page 150 ends

Equipment Make/Model Quantity Purchase Cost
Unmanned Aircraft System (UAS)-Drone (1):

DJI Avanta 2 2 $3,750.00
DJI Mavic 3 Thermal Enterprise 2 $15,946.30
DJI / Mini2 1 $3,770.36
Autel EVO II Pro 1 $2,447.00
40 MM Launchers and Rounds
LMT Defense, 40MM single shot launcher 3 $837.50
Def Tech / 40MM Exact Impact Sponge 83 $18.95
Def Tech / 40MM Direct Impact CS 10 $24.50
Less Lethal Shotguns
Remington Model 870 35 $946.00
Drag Stabilized 12-Gauge Beanbag Round 460 $5.00
Rifles and Rounds
Rifles
Daniel Defense / DDM4 23 $2,057
Daniel Defense / AR15 5 $2,057
Colt / M16 2 $2,057
Remington 700 2 $2,200
Rounds
Winchester 223 Remington (55) FMJ 2,200 $169
Winchester Ranger 223 Remington (55) PSP 9,200 $297.44
PepperBall Launchers and Rounds
Launcher PepperBall Tac SF Launcher 2 $1,300
Rounds Inert (Training)
Glass Breaking 10 $20.95
Live - X Rounds 465 $3.00
Equipment/Transport Vehicle:

SWAT 2019 Ford F450 Crewcab / Vin # 1FD0W4GY4KED00546 / License 1 $130,000.00 Distraction Devices (LSDD - "Flashbangs"):

SWAT Combined Tactical Systems (CTS), Model 7290 Flashbang 18 $43.93 Chemical Agents
SWAT Riot Control CS Continuous Discharge 10 $25.75
SWAT Flameless smone Tri-Chamber CS 20 $35.75

Page 151 ends

Expected Life Span Annual Fiscal Impact Notes:
3-5 years $700.00
3-5 years $1,946.30
3-5 years $700.00
3-5 years $700.00
25 years $50.00
5 years N/A
5 years N/A
25 years $50.00
No Expiration Date N/A
25 years $50.00
25 years N/A
25 years N/A
25 years N/A
No Expiration Date N/A price per 500
No Expiration Date N/A price per 500
20 Years $50.00
20 Years N/A price per 10
3 years N/A
10 years $1,000.00
Until Used None
5 years N/A
5 years N/A

Page 152 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: June 4, 2024
Members of the City Council
SUBJECT: Authorize staff to increase the amount of PO# 240037 issued to SC Fuels for bulk fuel by $34,000.

Three-Year Strategic Goals
☐ Enhance the culture and environment of “A Nice Place to Live” ☐ Achieve fiscal stability by evaluating processes, and attract and retain revenue producing businesses/opportunities
☐ Attract and retain quality staff through best practices and trends ☐ Maintain, build, and modernize infrastructure to support growth and future needs of the City
☒ Not applicable
EXECUTIVE SUMMARY:

Staff is requesting that the City Council authorize staff to increase the amount of PO# 240037 issued to SC Fuels for bulk fuel by $34,000.

The City purchases bulk gasoline and diesel fuel which is delivered to Fire Station Nos. 1 & 2 to fuel Fire apparatuses and ambulances. Based on actual expenditures for gasoline and diesel, current usage, continuing high fuel prices, and the fuel provided to the contracted ambulances, staff projects that the City will need an additional $34,000 ($9,500 for gasoline; $24,500 for diesel) on PO# 240037 so the Fire Stations can continue to receive bulk fuel deliveries for the remainder of the fiscal year.

There are sufficient funds in the Gasoline (112.50.50001.53552) and Diesel (112.50.50001.53557) accounts within the Fleet Management Fund for the requested PO change order.

DISCUSSION:

The City of Fountain Valley maintains and operates a fleet of over 150 vehicles, including fire apparatuses, police patrol vehicles, police motorcycles, emergency response vehicles, heavy equipment, work trucks, and passenger cars. Most of the fleet is powered by gasoline or diesel fuel which is purchased at local gas stations using fuel cards. The City also purchases bulk fuel which is delivered to Fire Station Nos. 1 & 2. Fire Station No. 1 receives both gasoline and

Page 153 ends

Increase PO# 240037 for Bulk Fuel
June 4, 2024

Page 2 ends

diesel fuel, while Fire Station No. 2 only receives diesel fuel. SC Fuels provides both fuel cards and bulk fuel deliveries.

Gasoline and diesel fuel are billed to two (2) separate accounts within the Fleet Management Fund:
 112.50.50001.53552 Gasoline
 112.50.50001.53557 Diesel
The bulk fuel deliveries to Fire Station Nos. 1 and 2 are purchased through PO# 240037 issued to SC Fuels in the current amount of $49,500, which allocates $9,500 for gasoline and $40,000 for diesel. The gasoline delivered to Fire Station No. 1 is used to fill up the City’s emergency support vehicles, while the diesel delivered to both fire stations is used to fill up the fire engines, pumper truck and tiller. In addition, the City also provides gasoline and diesel fuel to the contracted ambulances, per its agreement with Care Ambulance Service, Inc. (CON-20-55, Section 7 – Operations, Paragraph B – Fuel).

Based on actual expenditures, current usage, continuing high fuel prices and the fuel provided to the contracted ambulances, staff is projecting that an additional $34,000 ($9,500 for gasoline; $24,500 for diesel) will be needed on the PO to pay for the bulk fuel deliveries to Fire Station Nos. 1 & 2 for the remainder of the fiscal year. Since the additional funds will increase the PO to over $50,000, City Council approval is needed per the City’s Purchasing Policy.

Therefore, staff is requesting authorization from City Council to increase PO# 240037 for bulk fuel by an additional $34,000 ($9,500 for gasoline; $24,500 for diesel), bringing the PO total to $83,500.

FISCAL REVIEW:

PO# 240037 was issued to SC Fuels for bulk fuel on August 2, 2023, in the amount of $9,500 ($2,500 Gasoline / $7,000 Diesel). This allowed the Fire Department to order bulk fuel deliveries until the FY 2023/24 budget was fully funded in Munis.

On August 24, 2023, PO# 240037 was increased to $49,500 ($9,500 Gasoline / $40,000 Diesel). The plan was to reevaluate the bulk fuel needs at midyear and adjust the PO as needed.

Unfortunately, there was some confusion regarding the payment of bulk fuel invoices beginning in November 2023 and continuing through May 2024 when it was discovered. The bulk fuel invoices were paid, but not liquidated from the bulk fuel PO. At midyear, this made it appear that there were sufficient funds for the remainder of the year. Public Works is working with Finance to remedy this situation. However, there are insufficient funds encumbered on the PO to accommodate the necessary corrections and the projected needs for the remainder of FY 2023/24.

Based on actual expenditures for gasoline and diesel, current usage, continuing high fuel prices, and the fuel provided to the contracted ambulances, staff projects that the City will need an additional $9,500 on the PO to pay for the bulk gasoline deliveries to Fire Station No. 1 and an additional $24,500 for the bulk diesel deliveries to Fire Station Nos. 1 & 2 for the remainder

Page 154 ends

Increase PO# 240037 for Bulk Fuel
June 4, 2024

Page 3 ends

of the fiscal year, including the accounting correction. Since the additional funds will increase the PO to over $50,000, City Council approval is needed per the City’s Purchasing Policy.

There are sufficient funds in the Gasoline (112.50.50001.53552) and Diesel (112.50.50001.53557) accounts within the Fleet Management Fund for the requested PO change order.

PO# 240037 – Bulk Fuel Original
Amount
8/24/23
PO Change
Order
Additional
Funds
Requested
New PO
Amounts
112.50.50001.53552 Gasoline $ 2,500 $ 9,500 $ 9,500 $19,000 112.50.50001.53557 Diesel $ 7,000 $40,000 $24,500 $64,500 Total $ 9,500 $49,500 $34,000 $83,500
The contracted ambulances fuel up at the City’s fire stations, utilizing some of the bulk fuel that is ordered through PO# 240037. The increased fuel amounts on PO# 240037 include an estimated $22,000 for ambulance fuel. Although the fuel accounts will be reimbursed from the ambulance service fees collected by the City, the bulk fuel PO must be fully funded to facilitate the necessary bulk fuel orders throughout the fiscal year.

PUBLIC NOTIFICATION:

Not applicable.

ENVIRONMENTAL IMPACT REVIEW:

Not applicable.

ATTORNEY REVIEW:

This does not require the Attorneys for the City review or approval. This action will be issued on a City approved purchase order form that provides standard terms and conditions which have been approved by the Attorneys for the City.

ALTERNATIVES:

Alternative No. 1: Authorize staff to increase the amount of PO# 240037 issued to SC Fuels for bulk fuel by $34,000. This is the recommended action.

Alternative No. 2: Do not authorize increasing the amount of PO# 240037 for bulk fuel. This is not recommended as this will hinder the Fire Department’s ability to receive bulk fuel deliveries at the stations for the remainder of FY 2023/24.

Page 155 ends

Increase PO# 240037 for Bulk Fuel
June 4, 2024

Page 4 ends

RECOMMENDATION:

Staff is requesting City Council approval of Alternative No. 1 to authorize staff to increase the amount of PO# 240037 issued to SC Fuels for bulk fuel by $34,000.

Prepared by: Christine Smith, Senior Management Analyst, Public Works Reviewed by: Mark Sprague, Field Services Manager
Approved by: Scott Smith, Director of Public Works
Fiscal review by: Ryan Smith, Finance Director
Approved by: Maggie Le, City Manager

Page 156 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: June 4, 2024
Members of the City Council
SUBJECT: A Public Hearing making clarifications to Ordinance No. 1605 and adopting Zoning Map Amendment No. 438
Three-Year Strategic Goals
☒ Enhance the culture and environment of “A Nice Place to Live” ☐ Achieve fiscal stability by evaluating processes, and attract and retain revenue producing businesses/opportunities
☐ Attract and retain quality staff through best practices and trends ☐ Maintain, build, and modernize infrastructure to support growth and future needs of the City
☐ Not applicable
EXECUTIVE SUMMARY:

On December 19, 2023, the City Council gave second reading to Ordinance No. 1605, in part, amending the zoning on nine sites in the City, consistent with the Housing Element. As part of that zoning code amendment, the City intended to leave the current zoning in place for 16101 and 16111 Harbor Boulevard, which was C-1 Local Businesses. While the Zoning Map attached to the staff report was consistent with that intention, the written description and Exhibit D to Ordinance No. 1605, reference the two (2) properties as part of the larger zone change for the shopping center to MU2-Mixed Use 2.

This agenda item clarifies the City’s intent to zone the properties as C-1 Local Business and adopts a zoning map with references that are consistent with that intent.

BACKGROUND:

On December 19, 2023, the City Council gave second reading to Ordinance No. 1605, in part, amending the zoning on nine sites in the City, consistent with the Housing Element. As part of that zoning code amendment, the City intended to leave the current zoning in place for 16101 and 16111 Harbor Boulevard, which was C-1 Local Businesses.

Table H-22 Housing Sites Inventory in the 2021-2029 Housing Element lists the Harbor Shopping Cener as an opportunity site. The total acreage of the shopping center is listed at

16.69 acres. The table further list assumptions of an assumed residential density of 35 dwelling units per acre for a total of 351 units in the shopping center. The assumed density

Page 157 ends

Zone Change Clarification
June 4, 2024

Page 2 ends

and total number of units assumes that a total of ten (10) acres would be made available for residential development (10 acres x 35 du/ac). The properties located at 16101 and 16111 Harbor Boulevard total approximately 6.67 acres; subtracting the acreage of these properties from the total shopping center acreage leaves the ten acres in tact as reference in the 2021- 2029 Housing Element.

DISCUSSION:

The intent of Ordinance No. 1605 was to leave the zoning for the properties located at 16101 and 16111 Harbor Boulevard as C-1 Local Business. While the Zoning Map attached to the staff report for Ordinance No. 1605, and included here as Attachment No. 2, was consistent with that intention, the written description and Exhibit D to Ordinance No. 1605, reference the two (2) properties as part of the larger zone change for the shopping center to MU2-Mixed Use

2. As described above, the 6.67 acres associated with these properties are not required to meet the 351 units associated with the shopping center in the 2021-2029 Housing Element and this agenda item clarifies the City’s intent to zone the properties as C-1 Local Business and adopts a zoning map with references that are consistent with that intent.

FINANCIAL REVIEW:

There is no fiscal impact related to this item.

PUBLIC NOTIFICATION:

Public hearing notices were mailed to all property owners within 500 feet of properties considered for rezoning. The item was also published in the Fountain Valley View and notices were posted at City Hall, Recreation Center and the Fountain Valley Library.

ENVIRONMENTAL IMPACT REVIEW:

An Environmental Impact Report (EIR) was prepared by PlaceWorks under the direction of the City for the General Plan and Housing Element Updates. It was prepared, noticed to other agencies and the public, and distributed pursuant to requirements of the California Environmental Quality Act. The EIR was intended to provide information regarding: (1) the potential environmental impacts of the proposed project; (2) ways in which any significant impacts of the project may be mitigated or avoided; and (3) alternatives to the project which could reduce or avoid the significant impacts. The EIR analyzed existing conditions and potential impacts for the projects, including changes in land use.

ATTORNEY REVIEW:

The Attorneys for the City reviewed this staff report.

Page 158 ends

Zone Change Clarification
June 4, 2024

Page 3 ends

ALTERNATIVES:

Alternative No. 1:

Introduce and Approve a First Reading of Ordinance ___ An Ordinance of the City Council of the City of Fountain Valley Clarifying the Zone Changes Adopted as Part of Ordinance No. 1605 and Approving Zoning Map Amendment No. 438.

Alternative No. 2: Do not introduce the Ordinance.

Alternative No. 3: Continue this request for additional information.

RECOMMENDATION:

Staff is requesting that the City Council approval of Alternative No. 1: Introduce and Approve a First Reading of Ordinance ___ An Ordinance of the City Council of the City of Fountain Valley Clarifying the Zone Changes Adopted as Part of Ordinance No. 1605 and Approving Zoning Map Amendment No. 438.

Prepared by: Omar Dadabhoy, Deputy City Manager/Community Development Director
Approved by: Maggie Le, City Manager
Attachments:

1. Ordinance No ___ -- AN ORDINANCE OF THE CITY

COUNCIL OF THE CITY OF FOUNTAIN VALLEY

CLARIFYING THE ZONE CHANGES ADOPTED AS PART
OF ORDINANCE NO. 1605 AND APPROVING ZONING
MAP AMENDMENT NO. 438

2. Zoning Map

3. Environmental Impact Report (posted at
https://www.fountainvalley.gov/1282/General-Plan-Update)

Page 159 ends

ORDINANCE NO.__________

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FOUNTAIN

VALLEY CLARIFYING THE ZONE CHANGES ADOPTED AS PART OF
ORDINANCE NO. 1605 AND APPROVING ZONING MAP AMENDMENT NO. 438
WHEREAS, the City of Fountain Valley has initiated a request to change the Zoning Map Designation of nine (9) Opportunity Sites (“Sites”) to align with the General Plan Land Use Map designations for the 2045 General Plan Update; and WHEREAS, it was the intent of the City of Fountain Valley to maintain the zoning of C-1-Local Business for the properties located at 16101 and 16111 Harbor Boulevard (APN Nos: 144-241-18, 144-241-19, 144-241-20 and 144-241-21); and WHEREAS, the C-1 Local Business zone was reflected in the Zoning Map attached to the City Council agenda report; and
WHEREAS, in the description of the properties to be rezoned, the City inadvertently included the 16101 and 16111 addresses:

WHERAS, the 2021-2029 Housing Element, approved through Resolution No. 9853 by the City Council on October 4, 2022 and certified by the State Housing Community Development Department (“HCD”) on October 13, 2022, indicates the need for 10 of the 16 acre shopping center to be utilized and rezoned to accommodate the City’s Regional Housing Needs Assessment: and
WHEREAS, the remaining properties in the shopping center zoned MU2-Mixed Use 2, comprise ten acres of land, which is sufficient to meet the portion of the Regional Housing Needs Assessment identified for the said shopping center; and WHEREAS, the Zoning Map Amendment would clarify the zoning and adopt a zoning map that represents a C-1 Zoning designation for 16101 and 16111 Harbor Boulevard as shown in “Exhibit A”; and
WHEREAS, the City has complied with the requirements of the Government Code Section 65300 et seq., the current State of California General Plan Guidelines, and the City’s applicable ordinances with respect to review and consideration of the proposed Zoning Map Amendments; and
WHEREAS, on June 4, 2024, the City Council held a duly noticed public hearing to consider Zoning Map Amendment No. 438; and
WHEREAS, the proposed Zoning Map Amendment No. 438 has been publicly noticed in accordance with State Law and the Fountain Valley Municipal Code; and NOW, THEREFORE, the City Council of the City of Fountain Valley does ordain as follows:

Page 160 ends

SECTION 1
The City of Fountain Valley has prepared a Draft Environmental Impact Report (DEIR) for the 2045 Fountain Valley General Plan (State Clearinghouse No. 2022100563) to address the potential environmental effects associated with implementation of the proposed project.

Pursuant to Public Resources Code Section 21165 and the California Environmental Quality Act Guidelines (CEQA Guidelines) Section 15050, the City of Fountain Valley is the lead agency for the proposed project. Pursuant to Public Resources Code Section 21083 and CEQA Guidelines 15087, the DEIR was available for a 45- day public review from Friday, June 9, 2023, through Monday, July 24, 2023. The DEIR was made available at City Hall and online at: https://www.fountainvalley.org/1282/General-Plan-Update. In conformance with CEQA, the State CEQA Guidelines, and the City of Fountain Valley CEQA Guidelines, the City of Fountain Valley conducted an extensive environmental review of the proposed project.  Completion of a Notice of Preparation (NOP) on October 25, 2022. The public review period extended from October 25, 2022, to November 24, 2022. The NOP was published in the Fountain Valley View on October 25, 2022. The NOP was posted at the Orange County Clerk’s office on October 25, 2022. Copies of the NOP were mailed to interested persons and organizations.
 Preparation of a Draft EIR, which was made available for a 45-day public review period beginning June 9, 2023, and ending July 24, 2023. The scope of the Draft EIR was determined based on the CEQA Guidelines Appendix G Checklist, and comments received in response to the NOP. The Notice of Availability (NOA) for the Draft EIR was sent to interested persons and organizations, sent to the State Clearinghouse in Sacramento for distribution to public agencies, posted at the City of Fountain Valley’s website, and published in the Fountain Valley View. The NOA was posted at the Orange County Clerk’s office on June 8, 2023. The Notice of Availability of the Draft EIR was published in the Fountain Valley View on June 8, 2023.  A Final EIR was prepared that includes responses to comment letters received during the 45-day public review period. Pursuant to Public Resources Code Section 21092.5, a copy of the Final EIR was distributed all commenting governmental agencies and departments at least 10 days prior to certification of the final EIR.  Both the Draft and Final EIR were made available at City Hall and online at:
https://www.fountainvalley.org/1282/General-Plan-Update.

SECTION 2
The City Council finds that due notice of the public hearing on June 4, 2024, conducted in the City Council Chambers, 10200 Slater Avenue, Fountain Valley, was given as required by the Fountain Valley Municipal Code, Title 21, and the State of California. Public notice of this hearing and a copy of the City Council agenda were posted at City Hall, Recreation Center and the Fountain Valley Library.

SECTION 3
Pursuant to Fountain Valley Municipal Code section 21.34.050 the City Council does hereby find as follows:

Page 161 ends

1. The proposed amendments ensure and maintain internal consistency with the actions, goals, objectives and policies of the general plan, and would not create any inconsistencies with this title, in the case of a title amendment.

The proposed Amendment to clarify and adopt the Zoning Map Designation for the two properties is consistent with the General Plan Land Use Map designations for the 2045 General Plan Update and is consistent with the 2021-2029 Housing Element.

Housing Element Program 1a, Program Category #1 Goal 1 states that the City shall amend the General Plan and Development Code to ensure sufficient capacity to accommodate the City’s 2021-2029 RHNA allocation and to require a minimum of 20 and allow 30 du/ac or greater on all sites listed in the sites inventory. Zoning Map Amendment No. 438 would allow for the use of the two properties located at 16101 and 16111 Harbor Boulevard (APN Nos: 144-241-18, 144-241-19, 144-241-20 and 144-241-21) to be zoned C-1 Local Business while still allowing the remainder of the ten acre shopping center to be utilized for housing/mixed use development, consistent with the City’s Regional Housing Needs Assessment and Table H-22 Housing Sites Inventory in the 2021-2029 Housing Element.

2. The proposed amendments would not be detrimental to the public convenience, health, interest, safety or welfare of the city.

The proposed amendment will not be detrimental to the public convenience, health, interest, safety or welfare of the city as it clarifies and maintains the C-1 Local Business zoning designation for the properties located at 16101 and 16111 Harbor Boulevard (APN Nos: 144-241-18, 144-241-19, 144-241-20 and 144-241-21).

3. The proposed project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA) and the city’s environmental review procedures as addressed in Section 1 above.

4. Additional Finding for Zoning Map Amendments. The site is physically suitable (including access, provision of utilities, compatibility with adjoining land uses and absence of physical constraints) for the requested zoning designation(s) and anticipated land use development(s).

The Sites are appropriate to accommodate the Zoning Map Amendments as attached in “Exhibit A” through “Exhibit I.” The General Plan Update Environmental Impact Report analyzed each site and determined each site is physically suitable for the requested zoning designations and anticipated land use development.

SECTION 4
The City Council finds that the amendments noted in Zoning Map Amendment No. 438 as set forth in “Exhibit A” and attached hereto, are consistent with the Fountain Valley Municipal Code, as well as the Fountain Valley General Plan. The City Council hereby clarifies that the Zoning Map specifies a C-1 Zoning designation for 16101 and 16111 Harbor Boulevard as shown in “Exhibit A”
SECTION 5
If any section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the ordinance. The City

Page 162 ends

Council declares that it would have passed this ordinance and each and every section, subsection, sentence, clause or phrase not declared invalid or unconstitutional without regard to whether any portion of the ordinance would subsequently be declared invalid or unconstitutional.

SECTION 6
The City Clerk shall certify to the adoption of this ordinance and cause it to be published as required by law. This ordinance shall become effective thirty (30) days after the date of its adoption.
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
PASSED AND ADOPTED by the City Council of the City of Fountain Valley at a regular meeting this 18th day of June, 2024.

ATTEST:
____________________________
Glenn Grandis, Mayor
Rick Miller, City Clerk

APPROVED AS TO FORM

HARPER & BURNS LLP
_________________________________
Attorneys for the City
City of Fountain Valley

Page 163 ends

ATTACHED: “EXHIBIT A”
Zoning: C1-
Local
Business
Zoning:

MU2-Mixed
Use 2

Page 164 ends

%&'(405
%&'(405
Santa Ana
Costa Mesa
Westminster
Huntington
Beach
Huntington
Beach

MACARTHUR BLVD HARBOR BLVD

GISLER AVE

WARNER AVE

WARD ST

NEWHOPE ST

HYLAND AVE

MCFADDEN AVE

BUSHARD ST

HEIL AVE

SOUTH COAST DR
BA

YORKTOWN AVE KER ST

NEWLAND ST

SLATER AVE

WARNER AVE

MAGNOLIA ST

EUCLID ST

BROOKHURST ST

BUSHARD ST

NEWLAND ST

GARFIELD AVE

SEGERSTROM AVE

TALBERT AVE

SUNFLOWER AVE

ELLIS AVE

BROOKHURST ST

EDINGER AVE

MAGNOLIA ST

WARD ST
Fountain Valley City Limit
Fountain Valley SOI
(R1) Single Family Residential
(R2) Low Density Multiple Dwelling
(R3) Medium Density Multiple Dwelling
(R4) High Density Multiple Dwelling
(R5) Very High Density Residential
(GH) Garden Homes
(MU1) Mixed Use 1
(MU2) Mixed Use 2
(C1) Local Business
(C2) General Commercial
(CP) Commercial, Administrative, Professional Office
(M1) Manufacturing
(SP) Specific Plan
(PI) Public Institution
(A1) General Agriculture
(P/OS) Parks and Open Space
Flood Control Channel
SOI
0 0.25 0.5
Mi
Source: PlaceWorks 2022 Date: 10/19/2023
Proposed Zoning

Page 165 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: June 4, 2024
Members of the City Council
SUBJECT: A Resolution adopting the FY 2024-25 Annual Operating Budget & Capital Improvement Program and; a Resolution Adopting the FY 2024-25 GANN Appropriations Limit and; a Resolution Establishing Property Rental Terms and Charges for Administrative Services for the Municipal Water & Sewer Utilities and; a Resolution Amending Resolution No. 9911.

Three-Year Strategic Goals
☐ Enhance the culture and environment of “A Nice Place to Live” ☐ Attract and retain revenue producing businesses
☒ Achieve fiscal stability in accordance with the 20-Year Financial Plan ☐ Attract and retain quality staff
☐ Not applicable
EXECUTIVE SUMMARY:

The Annual Budget allocates City resources to accomplish the goals of the City Council and provide City services to its residents. A majority of City services are funded by the City’s General Fund. The City Manager presents budget for consideration by the City Council prior to the beginning of each fiscal year. The Proposed FY 2024-25 Annual General Fund Operating Budget is balanced, and supports or enhances the needs of departments citywide, providing the resources necessary to continue to provide high quality public service, maintain and enhance the City’s infrastructure and continue to pay down unfunded actuarial liabilities in accordance with the Measure HH Responsible Spending Plan.

DISCUSSION:

On May 7, 2024, the City Council held a budget workshop to review and discuss the Draft FY 2024-25 Annual Budget and Capital Improvement Program. The purpose of the workshop was to allow for questions on both specific programs and capital projects within the budget as well as a more general overview of the City’s finances. The budget workshop was followed by a Measure HH Oversight Committee meeting on May 16, 2024 at which the Measure HH Oversight Committee reviewed the proposed use of Measure HH funds within the FY 2024-25 proposed budget to discuss if such expenditures within the proposed budget are consistent with the intent of the Measure HH ballot measure and Responsible Spending Pledge. The budget is continually reviewed for adherence to the City’s 20-year long-term financial forecasting plan, preservation of the City’s financial integrity, and proper implementation of the City’s Strategic Plan initiatives.

Page 166 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 2 ends

The proposed FY 2024-25 budget looks to maintain current service levels while preserving a conservative outlook for revenue and expenditure growth. Citywide, total appropriations are budgeted at $161.6 million, an increase of 11.7% versus the adopted FY 2023-24 budget. These expenses are supported by $137.2 million in revenue, an increase of 4.9% percent from the current fiscal year. These total figures reflect revenues and expenses for all funds citywide including the General Fund, Enterprise Funds, Internal Service Funds, Debt Service Funds, and Special Revenue Funds.

Internal Service Funds, including information technology, government buildings, fleet management, capital equipment, and self-insurance, account for activities provided to one City department by another City department. The Proposed FY 2024-25 budget includes $17.1 million in appropriations for these funds.

Special Revenue Funds are funds legally restricted to a specific purpose. Examples of Special Revenue Funds include the Gas Tax Fund and the Community Development Block Grant (CDBG). In total, expenses in Special Revenue Funds are proposed to be $11.1 million for FY 2024-25, including capital improvement projects.

Debt Service Funds are used to account for debt service expenditures on general long-term debt.

The City currently has four (4) outstanding debt obligations; the 2014A Revenue Bonds, 2016A Lease Revenue Bonds, 2015A Pension Obligation Bonds, and the 2017 Clean Energy Renewable Bonds (CREBS). Payments for citywide debt, including is $3.5 million for FY 2024-

25. Capital Improvement Funds, including the CIP and Drainage Funds, are used to account for the City’s capital projects. In total, FY 2024-25 appropriations in the Capital Improvement Funds are budgeted at $15.0 million.

Enterprise Funds are proprietary funds supported by user fees and charges. The rates charged to customers for these services cover the costs of operation, maintenance, and capital and infrastructure improvements. The City maintains several Enterprise Funds including Water, Sewer, and Solid Waste. Expenditures in these funds for FY 2024-25 is proposed to be $35.3 million for both operating and capital.

The General Fund
The General Fund is the primary operating fund of the City and supports fundamental services including Police, Fire, Community Development, Community Services, and general administration. Revenue for this fund comes from general taxes such as property tax, sales tax, Measure HH, and transient occupancy taxes as well as a variety of user and permit fees and other smaller sources. The Proposed Budget for FY 2024-25 for the General Fund is $78.6 million in expenses and $80.2 million in revenue, with an additional $7.6 million appropriated for onetime capital projects.

General Fund Revenue Highlights
Total FY 2024-25 General Fund revenues are projected to be $80.2 million, an increase of $1.7 million or 2.2%, as compared to the FY 2023-24 Revised Budget. Projected increases in Property

Page 167 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 3 ends

Tax, Franchise Fees, and Charges for Services are offset by reductions in Measure HH Tax and Intergovernmental Revenue. Below are some highlights of significant revenues and changes compared to FY 2023-24.
 Property Tax – Property Tax is projected to total $25.15 million, an increase of $1.2 million or 4.83% over FY 2023-24. These projections come from the City’s property tax consultant HDL Coren and Cone.
 Sales Tax – Sales Tax is projected to total $16.7 million, a slight increase of $20,000 versus the FY 2023-24 revised budget.
 Measure HH – Measure HH transaction tax is projected at $17.24 million, a slight decrease of $10,000. Both Sales Tax and Measure HH tax projections have been prepared by the City’s sales tax consultant HDL Companies.
 Franchise Fees – Staff is projecting an increase of $200,000 or 8.3% in various franchise fees. These projections are based off recent trends and increased utility costs.  Staff is budgeting a $1.2 million or 27.9% decrease in intergovernmental revenue in FY 2024-25, primarily due to a reduction in one-time grant revenues in FY 2023-24.  Charges for Services has a projected increase of $1.3 million or 23.3%. This is largely due to a $700,000 increase in Fire Department EMS Revenue, which is offset by $410,000 in additional ambulance program expenditures.

General Fund Expenditure Highlights
General Fund expenditures are broken into two distinct types – operating and capital. Operating expenses are those required to support the day-to-day operations of the City including personnel expenses, professional services, maintenance expenses, and the purchase of needed equipment, and are supported by revenue generated in the fiscal year the expenses occur.

Capital expenses are one-time expenditures that are funded through the reserves, where funds have been set aside from savings over multiple fiscal years and/or one-time funding sources such as reimbursements and development agreements.

The Proposed FY 2024-25 General Fund Budget includes $78.6 million in operating expenses and $7.6 million in capital expenditures. Below are highlights of the most significant changes from the prior year.

Page 168 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 4 ends

Proposed General Fund budgets for the respective departments are listed below:
*Excludes capital outlay, grants, debt service, and CIP projects.

Operating Expenses – Overall, operating expenses are projected to increase by $5.5 million or

7.5% over FY 2023-24.
 Fire Department expenditures represent an increase of $1.1 million or 6.9%. This is primarily due to a rise in labor costs including health benefits, and the City’s CalPERS Unfunded Accrued Liability (UAL).
 Operating expenses in the Police Department are also affected by rising costs associated with personnel, health benefits, and the growing UAL. The impact of these costs is a notable increase of $2.4 million or 11.16%.  Operating expenses in Administration represent an increase of $696,000 or

11.84%. The increase is mostly associated with higher personnel costs in Human Resources ($265k), expenses associated with the 2024 General Election ($100k), and consultant contracts for grants ($72k) and marketing ($50k) in Administrative Services.
 Community Development operating expenses show an increase of $465,000 or

18.16% due mainly to labor costs ($139k) and professional services for document scanning ($70k) and CEQA compliance.
 The Recreation and Community Services operating budget increased $379,000 or

10.61%. The bulk of the increase is a result of rising personnel and health benefit expenses, coupled with added special events and related costs.  Operating expenses in Public Works and Engineering increased by $183,000 or

1.85%, and are mostly attributed to personnel and employee benefits.

Page 169 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 5 ends

Internal Service Expenses – Overall, Internal Service Expenses increased by $4.9 million, or

41.2% compared to the FY 2023-24 revised budget.
 The Information Technology Fund budget increased by $1.3 million or 39.7% compared to the previous fiscal year. The increase is attributed to citywide technology implementations and upgrades for department software, network switches, security cameras, telephone systems, and desktop replacements.  The Government Buildings Fund budget increased $141,078 or 5.5% from FY 2023-24. The increase is primarily due to roof repairs for Police and City Yard facilities, flooring and doors for the Recreation and Senior Center, Tennis and Pickleball Court resurfacing, and fire alarm systems at various locations.  The Fleet Services Fund budget increased $2.5 million or 115.3% due to the need for additional vehicles to make up for supply chain shortages over the past couple of years. The proposed budget includes the replacement of several trucks for citywide operations and maintenance, a pumper truck for the fire department, five (5) police vehicles for patrol and enforcement, and other related equipment.  The proposed Capital Equipment Fund budget increased $407,606 or 79.8% compared to last fiscal year and includes cardiac monitors, defibrillators, ballistic vests, turnout gear, firearms, furnishings, and other smaller items citywide.  The proposed budget for the City Self Insurance Fund increased $584,778 or 16.3% over last year. The increase is mainly due to a rise in employee insurance benefits including workers' compensation, unemployment, and long-term disability.

Personnel Expenses – Personnel Expenses increased $4.5 million or 12.1% from FY 2023-24.  Increases are primarily due to additional salary and benefit costs from approved and projected MOU-related increases, a rise in the CalPERS unfunded accrued liability, and proposed new positions.
 New Positions
o One (1) new FTE has been proposed for FY 2024-25. The City Clerk department has requested a Risk Manager position. This position would oversee the risk management function including minimizing liability risk for the City, providing support for worker’s compensation, and administer emergency preparedness programs. The new position has a total annual cost to the City of $188,570.
o One (1) new part-time Administrative Intern position is proposed to replace 500 hours currently utilized by an existing Customer Service Representative position. The result is a budget decrease of $3,608.
o One (1) new part-time Maintenance Worker I position in the Public Works department is proposed for a total of 1,000 hours and a cost to the City of $26,817.
o Three (3) new FTE Recreation Coordinator positions are being proposed by the Recreation & Community Services department. These positions are being proposed to replace part-time staff and will result in a reduction of 9,000

Page 170 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 6 ends

part-time hours annually. The addition of 3 full-time positions and elimination of 9000 part-time hours have a total net additional cost of $45,841 annually.

Transfers Out – General Fund Transfers Out total $13.8 Million in FY 2024-25, an increase of $216,630 or 1.59% from FY 2023-24. Included in the $13.8 million in transfers are:
 $8.3 million for the City’s required Pension Unfunded Accrued Liability (UAL) payment to CalPERS, an expected increase of $1.43 million compared to FY 2023-

24.  $3.0 million in additional payments towards the City’s Pension Unfunded Accrued Liability (UAL) in accordance with the Measure HH Responsible Spending Pledge.  Debt Service for three (3) bonds totaling $2.49 million, a slight increase of $48,785 compared to the prior year.
 Reduction in transfers to the Employee Benefits fund for post-employment benefits.

This reduction is due to a change in budget methodology. All expenditures within the Employee Benefits internal service fund are now being allocated to the departments in which the costs occur.

Significant Changes
As previously mentioned, the proposed budget includes $3.0 million in additional payments to CalPERS to help pay down the City’s unfunded actuarial liability (UAL). As of the most recent CALPERS actuarial reports, the City’s unfunded actuarial liability is approximately $92.1 million, exclusive of assets held in the City’s 115 pension trust. The City is committed to paying down this debt as quickly as possible by making payments in addition to the normal and amortized UAL costs mandated by CalPERS. Doing so will save a significant amount in interest over the 20- year amortization period and complies with one of the primary goals of Measure HH to “pay down unfunded liabilities”.

Change in Accounting
Through discussions with the City’s auditors, it has been determined that, beginning with FY 2023-24 year-end reporting, the City’s internal service funds will be reported independent of the General Fund (with the exception of the Employee Benefits fund). Previously, all Internal Service Funds have been “rolled” into the General Fund in the year-end reporting. The biggest impact of this change in accounting will be removing each Internal Service Fund balance from the overall General Fund balance. It does not reduce the overall City Fund balance, just reports each fund balance independently from the General Fund. For the proposed FY 2024-25 budget, City staff has moved the projected ending fund balances of the Internal Service Funds out of the General Fund. There will be no impact to the operations of each Internal Service Funds with this change in accounting. Each ISF will continue to operate as it has in previous years.

Staffing
The proposed fiscal year 2024-25 budget includes 268.25 authorized full-time equivalent (FTE) positions, reflecting a net increase of increase of one (1) position from the prior fiscal year. The proposed Risk Manager position in the City Clerk Department would oversee the risk management function including minimizing liability risk for the City, providing support for worker’s

Page 171 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 7 ends

compensation, and administer emergency preparedness programs. The new position has a total annual cost to the City of $188,570.

Capital Improvement Program
The City’s proposed Capital Improvement Program (CIP) for all funds totals $25,217,970 in FY 2024-25.
 These projects are funded by a variety of sources, including General Fund, Measure HH, SB-1, Gas Tax, and Measure M.
 The General Fund portion of this plan (including Measure HH) is budgeted at $5,748,500.
 The CIP matrix is split into three (3) sections: Fund 300 for general Capital Improvements, Fund 500 for Water Utility projects, and Fund 501 for Sewer Utility projects.
 The FY 2024-25 Capital Improvement Plan matrix can be found on page 153 of the proposed budget document. This matrix lists the Projects and total budget on the left, with the funding source for each project listed across the top.  Additionally, page 179 of the budget document shows a listing of CIP projects that are or have been in the works but are currently unfunded. Staff is currently working to find additional funding for these projects.

Measure HH and the 20-Year Financial Plan
The City’s 20-year Financial Plan is a dynamic document that enables city leaders to forecast the impact of various financial decisions such as labor agreements, new development, capital projects, and fluctuations in the economy, on city finances over the long-term. This 20-year focus ensures the City’s financial sustainability by understanding how short term decisions can have a substantial impact on the structural deficit/surplus when Measure HH sunsets in 2037. The proposed 20-year plan, included on page 206 of the budget document, has been updated with the FY 2024-25 Proposed Budget being used as the base year for the forecast. The current 20- Year Financial Plan shows an operating surplus in the year Measure HH sunsets, 2037, with surpluses occurring in each subsequent year.

Gann Limit
In accordance with Article XIIIB of the State Constitution, the City must establish an annual appropriations limit by resolution known as the “Gann Limit”. This year, the City’s appropriation limit is established at $180,604,884 as stated in the attached resolution. Appropriations subject to the limitation in fiscal year 2024-25 are projected to be $61,990,563 or $118,614,321 under the limit. The data used in computing the City’s appropriation limit has been available for public inspection.

Page 172 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 8 ends

Annual Schedule of Property Rental and Administrative Charges to Municipal Water & Sewer Utility Funds
A calculation is made annually to recover the cost of the use of city property and city services that are provided to or used by the Municipal Water and Sewer Utility Funds. This schedule and methodology is adopted by resolution annually and detailed information relating to the calculation of these charges is available in the Finance Department at least 15 days prior to the presentation of the budget for adoption consideration. This year, the reimbursement requested is $2,136,034.

FINANCIAL ANALYSIS:

The Proposed FY 2024-25 Annual Operating Budget is balanced with a projected General Fund structural surplus of $1,531,595. The overall projected net change to the General Fund balance, including Capital Improvements, is a negative ($6,127,610). The budget maintains essential public services and supports capital improvements while continuing the City’s commitment to restoring reserves and paying down debt. The City’s financial policies, guided by the Measure HH “Responsible Spending Pledge” and the 20-Year Financial Plan, aim to ensure the City’s long-term fiscal sustainability and ability to adapt quickly to changing economic climates.

ALTERNATIVES:

Alternative No. 1: Adopt a resolution adopting the FY 2024-25 City of Fountain Valley Annual Budget and Capital Improvement Program; and Adopt a resolution approving the FY 2024-25 Gann Appropriations Limit; and Adopt a resolution establishing the FY 2024-25 annual schedule of property rental and administrative service charges to the Municipal Water and Sewer Utility Funds; and Adopt a resolution amending Resolution No. 9911.

Alternative No. 2: Do not adopt the FY 2024-25 Fiscal Year Budget and related actions and continue this matter to a later date. This alternative is not recommended as such action could impair the City’s ability to operate or provide City services after June 30, 2024 without authorizing appropriations amounts as required by City policy.

RECOMMENDATION:

Staff recommends that the City Council approve Alternative No. 1 to:

1. Adopt a resolution adopting the FY 2024-25 City of Fountain Valley Annual Budget and Capital Improvement Program;

2. Adopt a resolution approving the FY 2024-25 Gann Appropriations Limit; and

3. Approve the Resolution Amending the City’s Salary Schedule

Page 173 ends

FY 2024-25 Proposed Annual Operating Budget & CIP
June 4, 2024

Page 9 ends

4. Adopt a resolution establishing the FY 2024-25 annual schedule of property rental and Administrative Service Charges to the Municipal Water and Sewer Utility Funds.

Prepared by: Robin Harnish, Finance Manager
Ryan Smith, Finance Director
Reviewed by: Colin Burns, City Attorney
Approved by: Maggie Le, City Manager
Attachment 1: Resolution adopting the FY 2024-25 Proposed Annual Operating Budget & Capital Improvement Program
Attachment 2: Resolution adopting the FY 2024-25 Gann Appropriations Limit.

Attachment 3: Resolution adopting the FY 2024-25 Annual Schedule of Property Rental and Administrative Service Charges to the Municipal Water & Sewer Utility Funds.

Attachment 4: Resolution Amending Salary Schedule Resolution No. 9911 Attachment 5: FY 2024-25 Proposed Annual Budget and Capital Improvement Program

Page 174 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FOUNTAIN

VALLEY, CALIFORNIA, ADOPTING AN ANNUAL BUDGET FOR THE CITY OF FOUNTAIN VALLEY, FOR FISCAL YEAR 2024-25
WHEREAS, the City Manager and Budget Manager have, heretofore, presented to the City Council a Proposed Operating Budget for Fiscal Year 2024-25; and WHEREAS, the Proposed Operating Budget includes the City of Fountain Valley, and information related to the Successor Agency, Housing Authority, and Public Financing Authority; and
WHEREAS, the City Council did hold a public workshop on May 7, 2024, in the Council Chambers of City Hall of said City, in order to review the proposed budget documents for Fiscal Year 2024-25; and
WHEREAS, the City Council did review proposed budget for the Fiscal Year 2024-25.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF FOUNTAIN VALLEY, CALIFORNIA DOES RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:

SECTION 1. Said Proposed Operating Budget, as so amended, is hereby adopted as the Fiscal Year 2024-25 Operating Budget for the City of Fountain Valley for the fiscal year commencing July 1, 2024 and ending June 30, 2025, and consists of estimated and anticipated expenditures and revenues for that fiscal year.

SECTION 2. The City Council does hereby approve and authorize the salary allocations as presented throughout the various departmental programs; the schedule of Inter-fund transfers, estimated continuing appropriations amounts; 2024-25 Capital Improvement Program expenditures along with the use of Capital Reserve Fund monies; and authorize the identified assigned or committed allocation of the General Fund cash balances.

SECTION 3. The City Manager or his/her designee, for purposes of administrative necessity in implementing the budget, is hereby authorized to transfer funds between accounts, programs and line item expenditures as long as the transfer does not exceed the total appropriation within a given fund or where such transfer is expressly prohibited in a resolution or ordinance approved by the City Council.

SECTION 4. That the City Clerk shall certify to the passage and adoption of this Resolution, and enter it into the book of original Resolutions.

PASSED, APPROVED and ADOPTED Page 175 by the City Council of the City of Fountain Valley at a regular City Council meeting held on this 4th day of June, 2024 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN
Glenn Grandis, Mayor
ATTEST:

Rick Miller, City Clerk
APPROVED AS TO FORM:

HARPER & BURNS LLP
Colin Burns
Attorneys for the City

Page 176 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FOUNTAIN

VALLEY, CALIFORNIA APPROVING AND ADOPTING THE ANNUAL
APPROPRIATIONS LIMIT FOR FISCAL YEAR 2024-25
WHEREAS, the State Constitution Article XIIIB restricts the appropriations growth rate for cities and other local jurisdictions; and
WHEREAS, the Article XIIIB, as amended by Proposition 111, requires cities to calculate their annual appropriations limit by the percentage change in 1) City population growth or county population growth; and 2) California per capita personal income or the increase in non-residential assessed valuation due to new construction; and WHEREAS, documentation used in the determination of the appropriations limit for fiscal year 2024-25 has been available to the public in the Finance Department for fifteen days prior to this meeting as required by Government Code Section 7910; and WHEREAS, a summary of this computation is provided in Exhibit “A”, which is incorporated by reference and attached hereto.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF FOUNTAIN VALLEY, CALIFORNIA DOES RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:

SECTION 1. That the Appropriations Limit for 2024-25 shall be $180,604,884, as calculated in Exhibit A, and the Appropriations Subject to Limitation in Fiscal Year 2024- 25 shall be $61,990,563 and therefore is $118,614,321 under the limit.

SECTION 2. That the City of Fountain Valley reserves the right to recalculate said limitation at a future time.

SECTION 3. That the City Clerk shall certify to the passage and adoption of this Resolution, and enter it into the book of original Resolutions.

PASSED and ADOPTED by the City Council of the City of Fountain Valley at a regular City Council meeting held on this 4th day of June, 2024 by the following vote:

AYES:

NOES:

ABSENT:

Page 177 ends
← All documents from this meeting