Cities Index.
Agenda

Fountain Valley City Council
February 4, 2025

Document
Agenda
Meeting
February 4, 2025
Body
Fountain Valley City Council
Pages
447
Original file
25.2 MB
Text extracted from the city's file for reading and search. Open the original on www.fountainvalley.gov. That file is the official record.

City of Fountain Valley
Warner/Newhope Specific Plan
Page iv – January 2025 Warner/Newhope Specific Plan
List of Figures
Figure 1 Regional Location ..................................................................................................................... 9 Figure 2 Local Vicinity ........................................................................................................................... 11 Figure 3 Planning Areas........................................................................................................................ 19 Figure 4 Land Use Plan......................................................................................................................... 27 Figure 5 Vehicular Access .................................................................................................................... 33 Figure 6 Parking Plan............................................................................................................................ 35 List of Tables
Table 1 Land Use Categories ..................................................................................................................... 25 Table 2 Parking Provided............................................................................................................................ 30

Page 165 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION I – Executive Summary January 2025 - Page 1
Warner/Newhope Specific Plan

1.1 PURPOSE AND INTENT
The 37.84-acre Warner/Newhope Specific Plan is an existing development that contains a mixture of uses including the world class Los Caballeros Sports Club, owner and tenant occupied residential units, warehousing, professional offices, medical offices, self-storage, and a gymnasium. While many of these uses are separate and distinct, they share common access and/or parking making this site a truly unique mixed use development.

The Warner/Newhope Specific Plan recognizes existing uses that were established prior to the adoption of this Plan, establishes the permitted uses, baseline conditions, and development standards for the Warner/Newhope Specific Plan.

1.2 PROJECT OBJECTIVES
The Warner/Newhope Specific Plan was developed to meet the following specific objectives:
• Since the majority of the Warner/Newhope Specific Plan area is developed with existing uses, this Specific Plan is expressly intended to acknowledge and accommodate those uses as well as provide flexible guidance for the future use, expansion, and improvement of the site.
• To establish the baseline development and parking conditions from which to tailor standards and regulations that governs the use and improvement of the site.
• To implement the goals, objectives, and policies of the City of Fountain Valley General Plan.
• To establish the zoning level development standards and regulations for the Specific Plan area.
• To encourage affordable housing opportunities for low and moderate income households.

SECTION I: EXECUTIVE SUMMARY

Page 166 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

• To establish clear and flexible parking standards that respond to the unique nature of the uses on the site.
• To recognize and accommodate existing legally established uses within the Specific Plan area.

Page 167 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 3
Warner/Newhope Specific Plan

2.1 WHAT IS A SPECIFIC PLAN
As provided in California Government Code Section 65450, a specific plan is a regulatory document that provides standards and criteria for the development of a particular area. The Warner/ Newhope Specific Plan establishes the planning concept, design and development guidelines, administrative procedures, and implementation measures necessary to achieve the orderly and compatible development of the project area. It is also intended to maintain consistency with and carry out the goals, objectives, and policies of the City of Fountain Valley General Plan.

2.2 FORMAT OF THE DOCUMENT
The Warner/Newhope Specific Plan is divided into the following main sections:

Executive Summary — This section provides a brief summary of the Warner/Newhope Specific Plan.

Introduction — This section provides the definition of and authority to prepare a specific plan, the format of the document, and a description of the location and existing characteristics of the site.

Development Plan — This section provides the detailed
descriptions of the land use plan, land use designations, circulation plan, parking plan, and the housing plan.

Development Standards — This section provides the standards and regulations directing the use, design of development within the Warner/Newhope Specific Plan.

Implementation — This section contains the provisions for development processing, and the development administration system for the Warner/Newhope Specific Plan.

Appendices — The Appendices contain the definitions, parking study, the Mitigated Negative Declaration, environmental clearance, an entitlement history, reciprocal parking/access agreement, and the City Council adopting ordinance.

SECTION II: INTRODUCTION

Page 168 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 4 ends

2.3 RELATIONSHIPS TO OTHER

REGULATORY DOCUMENTS

2.3.1 Consistency with the General Plan and
Development Code
The General Plan is often described as the constitution of a community. It describes the desired long-range future condition of a community in broad terms. The City of Fountain Valley General Plan designates the Warner/Newhope Specific Plan area as Specific Plan. This designation allows for a mixture of indoor/outdoor sports and fitness clubs, professional office, medical office, gymnasiums, self-storage, manufacturing, and residential uses.

While the General Plan designation of Specific Plan is
purposefully broad, the zoning provides more detailed land use direction for the site. The zoning designation for the site is Specific Plan (SP). As described in Section 21.12.020(C) of the City of Fountain Valley Municipal Code, “The SP zoning district is intended to address specific areas within the community that warrant a comprehensive set of land use policies and standards designed for the unique features of an area…
Sites within the SP district shall be developed according to standards adopted within the applicable specific plan to address specific site constraints and opportunities, including buffering, traffic, noise, and other land use compatibility impacts.” Accordingly, the Warner/Newhope Specific Plan provides detailed development standards and use regulations that have been tailored to address the unique conditions of this site. The Warner/Newhope Specific Plan is adopted by Ordinance; hence, the Specific Plan’s guidelines and standards serve as the zoning regulations for the Specific Plan area.

All future development plans, site plans, subdivisions, and uses within the Specific Plan area must be consistent with the Warner/Newhope Specific Plan. All projects that are found to be consistent with this Specific Plan will likewise be deemed consistent with the General Plan.

Page 169 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 5
Warner/Newhope Specific Plan

2.3.2 Compliance with the California Environmental
Quality Act
Adoption or amendment of a Specific Plan constitutes a project under the California Environmental Quality Act (CEQA). A Mitigated Negative Declaration has been prepared in accordance with CEQA (Section 15168) to analyze the environmental impacts of the Warner/Newhope Specific Plan, see Appendix C.

The 2025 amendment to increase the allowed residential
development capacity for an additional 676 residential units in Planning Areas A and C was evaluated and cleared under CEQA through the City’s General Plan Update Environmental Impact Report (EIR, SCH# 2022100563). The EIR also evaluated an additional 136 units (for a total of 812) based on the inclusion of some affordable units and the application of state density bonus law.

Future development projects and uses that are consistent with the provisions of this Specific Plan may not require further environmental documentation. For projects that are not consistent with this Specific Plan or if conditions change, a new or a focused environmental review may be necessary as described in Section 15162 of the CEQA guidelines.

2.3.3 Compliance with the Industrial Prior Area
Redevelopment ProjectGoals and Objectives
Before the dissolution of redevelopment agencies in 2012, Tthe Warner/Newhope Specific Plan is was located in the Industrial Area Redevelopment Project Area. This 498-acre
Redevelopment Project was originally adopted in 1976, and subsequently amended, with the purpose of mitigating flooding impacts, addressing disconnected land uses, improving poorly maintained structures, and correcting inadequate public improvements.

The Warner/Newhope Specific Plan complies was originally adopted in 2004 in part to implement with the goals and achieve the objectives of the Industrial Area Redevelopment Project, specifically the following:
• Promote local job opportunities. Approximately 542,000 square feet of non-residential uses can be developed in the Specific Plan, including recreational related, offices, and industrial uses.

Page 170 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 6 ends

• Implement design and use standards to assure high aesthetics and environmental quality, and provide unity and integrity to developments within the Project Area. The Warner/Newhope Specific Plan provides development standards and design guidelines that direct the use and development of the Specific Plan.
• Address parcels of property that are: of irregular shape, are inadequately sized for proper usefulness and development, and/or are held in multiple ownerships. Several parcels, many of which are under separate ownerships, share parking and access within the Specific Plan, creating a unique development that requires tailored standards and guidelines.
• Recycle and/or develop underutilized parcels to accommodate higher and better economic uses while enhancing the City’s financial resources. The Warner/Newhope Specific Plan
provides the framework for the redevelopment and
development of parcels within the plan area while assuring that future development will not overburden shared parking facilities and that future uses are of high quality.
• Increase, improve, and preserve the community’s supply of housing affordable to very low, low, and moderate-income households. The Warner/Newhope Specific Plans provides for the development of housing units up to 20 units per acre plus a density bonus of 25% for providing affordable housingat a wide range of densities. New residential development (constructed in or after 2024) is subject to the City’s Inclusionary Housing Program and are therefore is also eligible for density bonus units per state law. The Specific Plan specifies the number of affordable units in each category that must be provided.

2.4 LOCATION AND DESCRIPTION
As shown in Figure 1, Regional Location, the Warner/Newhope Specific Plan is located in Orange County on the eastern edge of the City of Fountain Valley adjacent to the Santa Ana River.

More specifically, the Warner/Newhope Specific Plan is an approximately 37-acre site located on the east side of Newhope Street between Warner Avenue and Slater Avenue. As shown in Figure 2, Local Vicinity, the Specific Plan area is generally bound by Newhope Street on the west, Warner Avenue on the north, the

Page 171 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 7
Warner/Newhope Specific Plan
Santa Ana River on the east, and a light industrial development on the south.

The project site is located in an area that contains a mixture of light industrial, office, and high density residential uses.

Immediately north of the site are light industrial, office, the Manor Care (Senior assisted living) and across Warner Avenue are single-family homes. To the south is an area of light industrial uses. To the east, across the Santa Ana River in the City of Santa Ana, is an area of light industrial and manufacturing uses.

To the immediate west are light industrial and office uses. To the west and across Newhope Street are medical and professional office, a post office, a nursery, and light industrial uses.

Page 172 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 8 ends

This page intentionally left blank

Page 173 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 9
Warner/Newhope Specific Plan
Figure 1 Regional Location

Page 174 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 10 ends

This page intentionally left blank

Page 175 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 11
Warner/Newhope Specific Plan
Figure 2 Local Vicinity

Page 176 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 12 ends

This page intentionally left blank

Page 177 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 13
Warner/Newhope Specific Plan

2.5 EXISTING SITE CHARACTERISTICS
The Warner/Newhope Specific Plan area contains a unique mixture of residential, recreational, office, light industrial, and storage uses, most of which share parking and access. In order to clearly describe the various uses on the site, the
Warner/Newhope Specific Plan is divided into planning areas.

2.5.1 Planning Areas
As shown on Figure 3, Planning Areas, the following twelve planning areas and two sub-planning areas contain the various uses on the site:

Planning Area A
This 10.2-acre Planning Area contains the Los Caballeros Sports Club. This approximately 127,747-square foot state of the art facility includes a fitness center that houses the cardiovascular, strength training, and free weight areas.

The sports club also provides two full-size basketball courts, two arena soccer stadiums, indoor & outdoor sand volleyball courts, sixteen indoor racquetball/handball courts, two squash courts, and thirty outdoor tennis courts including peewee courts and an outdoor paddle tennis court. The Sports Club also provides a 50- meter Olympic pool, a 30x60 training pool, and a 24x54 wading pool.

The Sports Club includes full catering and banquet facilities, a restaurant, bar, snack bar, a hair salon, an entertainment center, and a pro shop.

In addition to the physical facilities provided on site, the Sports Club offers numerous classes including one-on-one and group training, over 40 aerobic classes per week, cycling classes, mind/body classes, fitness assessments, tanning beds, physical therapy, massage center, and martial arts.

The Sports Club offers infant care, child care, a sports center for youth up to 16 years old, computer and tutoring classes, and an after school program and sports camps for youths.

The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Los Caballeros Sports
Club in Planning Area A.

Page 178 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 14 ends

Sub-Planning Area A-1 and B-2
This .26-acre area is divided into two Sub-Planning Areas that describe two distinct uses, which are contained within a single structure. The ground floor contains the Sports Club related youth facilities and child care facilities. The second and third floors contain residential uses.

Sub-Planning Area A-1 is a 6,552-square foot youth center that includes infant care, childcare, and a game room.

Sub-Planning Area B-2 provide 24, one-bedroom residential condominiums. The 24 residential units are located in two floors above the youth center. There is no separate, reserved parking for these residential units. Instead, the parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Planning Area B
This 2.9-acre Planning Area accommodates 149 residential units centered on common courtyards containing two private pools and barbeque facilities.

There are three distinct residential complexes within this Planning Area, each built in separate phases. In phase one, the 44 units adjacent to the Olympic sized pool were developed. These threestory units each provide two bedrooms. A unique aspect of these units is that portions of some units can be sublet. If completely sublet, there is the potential for an additional 36 separately occupied units in this phase. The reserved parking for these 44 units is described in Sub-Planning Area B-1.

In phase two, 84 units were developed in a three-story complex.

These units are located in the middle of Planning Area B and contain a mixture of 36 one-bedroom, 12 two-bedroom, and 36 three-bedroom units. The reserved parking for these 84 units is described in Sub-Planning Area B-1.

In phase three, the 21 units on the western edge of the Planning Area were developed. This three-story complex contains onebedroom units. There are no reserved parking spaces for these units. The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Residential development
in Planning Area B
Sub-Planning Areas A-1
and B-2

Page 179 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 15
Warner/Newhope Specific Plan
Planning Area C
This 1.2-acre Planning Area accommodates the 41,520-square foot Plaza Del Lago Professional Center. This office complex houses medical and professional uses centered on an artificial lake. There are 54 office spaces in Plaza Del Lago, 27 on both floors. The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Planning Area D
This .47-acre Planning Area accommodates the 26,500-square foot Yardley distribution warehouse. There are three loading docks: the two main loading bays on the western end of the building and roll up doors on the northern end of the building. The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Planning Area E
This .45-acre Planning Area accommodates the 16,439-square foot Newhope Academy of gymnastics and dance. This facility offers gymnastics and dance instruction. The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Planning Area F
This .24-acre Planning Area accommodates a 14,000-square foot office complex. The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Planning Area G
This .45-acre Planning Area accommodates a mixture of an 8,400-square foot self-storage facility with 33 storage units on the ground floor and a 3,600-square foot office complex on the second floor. The parking for this Planning Area is located in the shared parking facilities in Planning Area K.

Plaza Del Lago in
Planning Area C
The gymnasium in
Planning Area E
The office complex in
Planning Area F
Mixed office and storage
use in Planning Area G
Planning Area D

Page 180 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 16 ends

Planning Area H
As of the adoption of this Specific Plan, this .59-acre Planning Area accommodated a vacant and turfed lot.

Planning Area I
This .78-acre Planning Area accommodates the 19,800-square foot manufacturing use. While there are 15 parking spaces provided within this Planning Area, which coincides with the parcel in this instance, the parking is figured into the total shared parking total.

Planning Area J
This 2.4-acre Planning Area accommodates an 86,000-square foot self-storage facility. Access to this self-storage facility is separate from the rest of the project site and taken from Newhope Street. Emergency access is provided in the southeast corner of the facility. The self-storage facility is fully parked on-site and is physically separated from the surrounding uses.

The self-storage facility occupies a portion of its legal lot. A parking and access easement is provided on the southern end.

This access area is included in Planning Area K and serves as overflow parking for the sports club.

Planning Area K
This 12.2-acre Planning Area accommodates the shared surface parking facilities and vehicular access. There are 768-shared parking spaces provided in this planning area. These parking spaces and the common vehicular access are provided for in a reciprocal parking and access agreement between Planning Areas A, B, C, D, E, F, G and H (See Attachment E). Coupled with the 15 parking spaces in Planning Area I and the 164 shared spaces in Planning Area K-1, there is a grand total of 947 shared parking spaces provided in the Specific Plan.

Vacant lot in Planning
Area H
Light industrial building in
Planning Area I

Page 181 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 17
Warner/Newhope Specific Plan
Sub-Planning Areas B-1 and K-1
This 1.3-acre Sub-Planning Area accommodates both shared and reserved parking spaces in a two-story parking structure.

Sub-Planning Area B-1 accommodates 128 reserved spaces on the lower level of the structure for the adjacent 84 and 44 unit residential projects. These spaces are secured behind gates and are for the exclusive use of the residents of the 84 and 44 unit residential projects. Each unit is assigned one space. Note: unit 316 does not have assigned parking but unit 32 has two assigned spaces.

Sub-Planning Area K-1, which is on the second level of the parking structure, accommodates 164-shared parking spaces that are part of the larger reciprocal parking and access arrangement.

Planning Area L
This 4.44-acre Planning Area encompasses the Los Caballeros Condominiums. This three-story residential project consists of 123 units with a mixture of 114 two-bedroom and nine onebedroom units. The three main buildings surround a courtyard that includes a swimming pool, spa, and lake.

There are 232 parking spaces provided for the use by residents and guests. This complex is self-parked and is not part of the reciprocal parking and access agreement.

This project is accessed from Warner Avenue but includes pedestrian access to the sports club through the tennis courts.

Surface parking and
structure of Planning
Area K
Parking structure with
shared parking above
and secured, reserved
parking below

Page 182 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 18 ends

This page intentionally left blank

Page 183 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 19
Warner/Newhope Specific Plan
Figure 3 Planning Areas

Page 184 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 20 ends

This page intentionally blank

Page 185 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction January 2025 - Page 21
Warner/Newhope Specific Plan

DEVELOPMENT ENTITLEMENT HISTORY
As noted, the majority of the Warner/Newhope Specific Plan has been developed. City authorization for this development began in 1977 with the approval of Conditional Use Permit No. 231, which established the Racquet and Sports Club. Since that time, there have been numerous City actions regarding
expansions/modifications to the sports club and numerous new uses.

While this Specific Plan outlines the baseline conditions for future modifications, a sense of the entitlement history is important.

Please see Appendix D for the chronology of the entitlement history of development in the Specific Plan area.

Page 186 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 22 ends

This page intentionally left blank

Page 187 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 23
Warner/Newhope Specific Plan

3.1 PROJECT DESCRIPTION
This section describes the land use plan for the Warner/Newhope Specific Plan. The land use plan is shown on Figure 4, Land Use Plan. A description of the corresponding land use categories is provided on Table 1, Land Use Categories.

The concept for the approximately 37-acre Warner/Newhope Specific Plan area is that of a mixed-use facility with shared parking and access facilities. The Warner/Newhope Specific Plan accommodates the Los Caballeros Sports Club, owner and tenant occupied residential units, warehousing, professional offices, medical offices, self-storage, and a gymnasium.

3.1.1 Land Use Designations
In order to describe the allowable uses within this mixed-use facility, the twelve Planning Areas and two Sub-Planning Areas identified in Figure 3, Planning Areas, are utilized.

The land use categories for the Warner/Newhope are shown on Table 1, Land Use Categories. The Warner/Newhope contains five separate land use categories that describe the intended use of the land as well as the standards for development.

Since many parcels share parking and access, in most instances the land use designations correspond with the Planning Areas, as shown in Figure 3, and not the legal parcel boundaries.

If individual property owners desire to develop their properties to the parcel lines, then the designation of the Planning Area on which the main structure is situated may be extended to the parcel lines. Any shared parking that may be lost must also be replaced at a one-to-one ratio.

Residential Density
The maximum residential density standards for each Planning Area is are described on in Table 1.

It is important to note that the maximum density for the residential uses existing as of the adoption of this Specific Plan was not determined on the traditional parcel-by-parcel basis. Due to historic mixture of uses and shared parking arrangement, the SECTION III: DEVELOPMENT PLAN

Page 188 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 24 ends

maximum density was instead determined by evaluating the range of permitted residential intensities in each Planning Area along with combining the densities and acreages for the parcels that contained residential uses and reserved parking for residential units. Specifically, the units and acreage for the following Planning Areas were combined to determine residential density:

Non-Residential Intensity
The maximum non-residential intensity for each parcel is also described on in Table 1. The maximum non-residential intensity is expressed as a “Floor Area Ratio” (FAR), which is the ratio of building area to lot area. The maximum permitted FAR is based upon existing development, if any, and a reasonable amount of future development potential. For a detailed breakdown of the existing and permitted non-residential intensities for each parcel, see Appendix G, Non-Residential Intensity Analysis.

Planning Area A = 10.2 acres and 0 units.

Planning Area B = 2.9 acres and 185 units.

Planning Area B-1 = 1.4 acres and 0 units.

Planning Area B-2 = .26 acres and 24 units.

Planning Area L = 4.43 acres and 123 units.

Totals 19.2 acres and 332 units
Or 17.3 units per acre
In this manner, the maximum density set forth in the General Plan (20 dwelling units per acre) is able to be maintained.

Future projects within Planning Areas A, B, B-1, B-2, and L will be required to utilize this method to determine residential density and may not exceed the density threshold as noted on Table 1. The density for future projects located outside of these Planning Areas shall be as noted on Table 1.

Page 189 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 25
Warner/Newhope Specific Plan
TABLE 1

LAND USE CATEGORIES
Plan.

Areas Land Use Category Intention
Allowable
Density/Intensity
A and
A-1
Sports and Fitness
Very High Density Residential
(Plan Area A only)
This land use category accommodates a
full service, indoor and outdoor sports
and racquet club, fitness center, and
health facility. This land use category
accommodates sports related facilities,
including gymnasiums, indoor and
outdoor courts, pools, gyms, and weight
lifting facilities.

This land use category accommodates
health and fitness related classes,
training programs, child care, catering
and banquet facilities, a restaurant, bar,
and snack bar, a hair salon, a sports club
related entertainment center, club related
offices, sports related retail and
residential uses. This land use category
also accommodates tanning beds,
physical therapy, and a massage center.

See Section IV of this Specific Plan for
permitted uses and development
standards.

This land use category accommodates
multiple-family dwellings and apartments.

See Section IV of this Specific Plan for
permitted uses and development standards.

Planing Area A
Up to 676 units1

0.5 Floor Area Ratio
(FAR)
Planning Area A-1
20 dwelling units per
acre 12

0.5 Floor Area Ratio
(FAR)
B and
B-2
High Density Residential This land use category accommodates multiple-family dwellings and apartments.

See Section IV of this Specific Plan for
permitted uses and development standards.
20 dwelling units per
acre 12
C Professional Office
Very High Density Residential
This land use category accommodates
professional offices. See Section IV of this
Specific Plan for permitted uses and
development standards.

This land use category accommodates
multiple-family dwellings and apartments.

See Section IV of this Specific Plan for
permitted uses and development standards.

0.35 FAR
Up to 676 units1
D Commercial Manufacturing This land use category accommodates light manufacturing and heavy commercial land
uses that do not generate polluting or
otherwise offensive impacts to surrounding
areas. See Section IV of this Specific Plan
for permitted uses and development
standards.

0.65 FAR
E Sports and Fitness This land use category accommodates sports training and instructional uses;
however, due to the size of the parcel, there
are limitations on the types of uses on this
planning area. See Section IV of this
Specific Plan for permitted uses and
development standards.

0.85 FAR
F Professional Office This land use category accommodates 0.4 FAR

Page 190 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 26 ends

TABLE 1

LAND USE CATEGORIES
Plan.

Areas Land Use Category Intention
Allowable
Density/Intensity
professional offices. See Section IV of this
Specific Plan for permitted uses and
development standards.

G Professional Office This land use category accommodates professional offices and personal storage.

See Section IV of this Specific Plan for
permitted uses and development standards.

0.8 FAR
H Future Expansion Area This land use category accommodates either light industrial, offices, or residential
uses. See Section IV of this Specific Plan
for permitted uses and development
standards.

0.5 FAR for nonresidential uses.
36 dwelling units per
acre for residential
use.

I Commercial Manufacturing This land use category accommodates industrial uses that limit objectionable or
obnoxious impacts such as smoke, noise,
fumes, vibration, radiation, light or glare that
might nearby residential and commercial
zones. See Section IV of this Specific Plan
for permitted uses and development
standards.

0.4 FAR
J Commercial Manufacturing This land use category accommodates industrial uses that limit objectionable or
obnoxious impacts such as smoke, noise,
fumes, vibration, radiation, light or glare that
might nearby residential and commercial
zones. See Section IV of this Specific Plan
for permitted uses and development
standards.

0.75 FAR
K and
K-1
Parking This land use category accommodates both
shared and reserved parking within the
main body of the Sports Club area (does
not include parking in Planning Areas L and
J).

This land use category accommodates
multiple-family dwellings and apartments
when in conjunction with, and immediately
adjacent to, new residential development in
Planning Areas A and C. See Section IV of
this Specific Plan for permitted uses and
development standards.

Planning Area K
Up to 676 units1
All Other Areas: Not
Applicable
L High Density Residential This land use category accommodates multiple-family dwellings and apartments.

See Section IV of this Specific Plan for
permitted uses and development standards.
20 dwelling units per
acre 12
* Planning Areas B-1, K, and K-1 are parking facilities and are reserved for parking and access (except as noted for K). 1. A shared / combined maximum of 676 residential units may be developed over the entirety of Planning Areas A and C, and portions of K, as shown in the 2021-2029 Housing Element. New residential must be developed at a minimum density of 20 units per acre, with density calculated using the net acreage of the development site associated with the proposed residential. 21 Density determined by the combination of the acreage and units for Planning Areas A-1, B, B-1, B-2, and L.,

Page 191 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 27
Warner/Newhope Specific Plan
Figure 4 Land Use Plan

Page 192 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 28 ends

This page intentionally left blank

Page 193 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 29
Warner/Newhope Specific Plan
Circulation and Parking Plan
Since a multitude of uses share parking and ingress/egress, the ability to maintain adequate access to these networks is a critical consideration of the plan.

3.1.2 Vehicular Circulation
As shown on Figure 5, Vehicular Circulation Plan, Planning Areas A, B, C, D, E, F, G, H, I, and K include four access points, including two common vehicular access points, two emergency access points, and a common internal circulation system that provides access to parking and each separate facility.

The primary access to Planning Areas A, B, C, D, E, F, G, H, I, and K is taken from Newhope Street from a controlled
intersection. The secondary access is also from Newhope Street from an uncontrolled intersection south of the main entrance and Planning Area J (Self-storage facility).

There are two emergency access points to Planning Areas A, B, C, D, E, F, G, H, I, and K. The northerly emergency access point goes around the racquetball building and continues westerly along the tennis courts and terminates in an easement that provides access to Newhope Street. The second emergency access point is located in the southeastern corner of the site adjacent to the Santa Ana River.

The existing northerly emergency access is 23 feet wide. The Fire Department has determined that this access way is of a sufficient width to comply with their needs and accommodate future development. The emergency access ways must be
maintained free and clear of obstructions, encroachments, and parking along its entire length from ground to sky.

Planning Areas J (Self-storage) and L (Residential) each provide their own separate access and emergency vehicular access points.

3.1.3 Parking Provided
In the Warner/Newhope Specific Plan, a total of 1,357 parking spaces are currently provided. These spaces are provided to each Planning Area as shown on Figure 6, Parking Plan, and detailed as follows:

Page 194 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 30 ends

TABLE 2

PARKING PROVIDED
Planning Area Number of Spaces Provided
L 232 private (all in Planning Area L)
J 50 private (all in Planning Area J)
I 15 shared spaces
B (44 and 84 unit) 128 reserved spaces (all in
Planning Area B-1)
A, A-1, B, B-2, C, D, E, F, G,
and H
932 shared spaces (all in Planning
Areas K and K-1)
Total 1,357 (947 shared spaces)
As noted in Table 2, 947 of the parking spaces within the Specific Plan are “shared” among several planning areas. Typically, the necessary parking is provided for each use within the parcel on which the use is located. In the shared parking concept, a number of uses jointly utilize a pool of common parking spaces.

The theory behind this concept is that parking is utilized more efficiently in this manner and the space that would typically have to be devoted to parking may be utilized for other uses.

In the Warner/Newhope Specific Plan, the shared parking spaces are not located on a single parcel but instead are located on separate parcels. A reciprocal parking, access, and maintenance agreement has been in place since 1980 to accommodate the development of these separate parcels around common parking and access.

3.1.4 Required Parking
Given the unique nature of the site, the mixture of uses, the sharing of parking among several separate parcels, and the historic development pattern based upon shared parking, the required amount of parking is not based upon the parking standards outlined in Chapter 21.22 of the Fountain Valley Municipal Code, but instead upon the actual demand for parking.

The exception being Planning Areas J and L, which are self contained and must meet the parking standards as specified in this Specific Plan.

Page 195 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 31
Warner/Newhope Specific Plan
Projects Participating in the Reciprocal Parking Agreement (Shared parking)
There are a total of 947-shared parking spaces in the
Warner/Newhope Specific Plan. These shared parking spaces are located in Planning Areas K and K-1. The shared parking spaces are all surface parking except for 164 spaces that are located in the upper level of the parking structure.

A parking demand study, conducted by Stevens-Garland
Associates in June 2004, has established the baseline condition for parking use and demand for Planning Areas A, A-1, B, B-2, C, D, E, F, G, H, and I (See Appendix B). Based upon this study, it has been determined that out of the 947 shared parking spaces, an average of 7767% are utilized at any one time. This means that, on average, 33% or 315 shared parking spaces are
available. As of June 2004, even if a 10% increase in parking usage is assumed, there is still ample shared parking to satisfy parking demand. Based upon this evidence, there is adequate parking on-site to satisfy demand.

In order to ensure adequate parking in the future, all new structures and expansions to existing buildings in Planning Areas that participate in the shared parking arrangement (Planning Areas A, A-1, B, B-2, C, D, E, F, G, H, and I) shall be required to verify that at least 5% (or 47 spaces) of the 947 shared parking spaces are open and available at peak periods (9-10 AM and 4-5 PM). If the 5% limit is reached, then new parking will be required to be accommodated in the amount necessary to meet the
demands of the proposed project. Accordingly, all new structures and expansions will be required to submit a parking study to verify the existing parking demand within Planning Areas K, K-1, and I to quantify the projected parking demand of the proposed
use/expansion.

There shall be no reduction in the total amount of shared parking.

Any shared parking spaces that are proposed to be eliminated shall be replaced on a one-to-one basis within the Specific Plan area.

Projects Not Participating in the Reciprocal Parking Agreement Planning Area L, which is zoned High Density Residential, is required to comply with the parking standards contained in Chapter 21.22, Parking and Loading, of the Fountain Valley

Page 196 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 32 ends

Municipal Code. At the time of the adoption of this Specific Plan, multi-family dwellings were required to provide the following:
• 1.5 spaces per studio or one bedroom unit with one space per unit in a garage or carport
• 2 spaces per two or more bedroom unit plus an additional 0.5 spaces for each bedroom over two. One enclosed space is required for each two-bedroom unit and two enclosed spaces are required for each three or more bedroom units.
• 25% of total required spaces must be provided for guest parking.

Planning Area J, which is zoned CM, Commercial Manufacturing, is a personal storage facility and currently provides 50 parking spaces on-site. Future development of this Planning Area will be required to comply with Chapter 21.22, Parking and Loading, of the Fountain Valley Municipal Code, which requires one parking space per 1,000 square feet of gross floor area plus two spaces for manager office/residence.

Page 197 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 33
Warner/Newhope Specific Plan
Figure 5 Vehicular Access

Page 198 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 34 ends

This page intentionally left blank

Page 199 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 35
Warner/Newhope Specific Plan
Figure 6 Parking Plan

Page 200 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 36 ends

This page intentionally left blank

Page 201 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION III – Development Plan January 2025 - Page 37
Warner/Newhope Specific Plan

3.2 HOUSING PLAN
All future residential projects are required to comply with the provisions contained in this Specific Plan and , the General Plan, including the Housing Element, and with Redevelopment Law.

3.2.1 General Plan
The purpose of the City of Fountain Valley’s Housing Element of the General Plan, which was adopted in November 2000, is to ensure the City establishes policies, procedures and incentives that will result in the maintenance and expansion of the supply of affordable housing. The Housing Element institutes policies that will guide City decision-makingdecision , andmaking and establishes an action program to implement housing goals through 2005.

New residential development in the Warner/Newhope Specific Plan will contribute toward the achievement of the following goals in the Housing Element:

Goal 1: Promote and encourage the development of a variety of housing opportunities to accommodate current and projected households.Goal 3: Promote and encourage affordable housing opportunities.

Goal 2: Assist in the provision of housing affordable to lower income households. Goal 4: Promote and encourage the
development of a variety of housing opportunities suitable to the needs of, and sufficient in number to accommodate current and projected households.

Goal 3: Address and, where possible, remove governmental constraints to the maintenance, improvement, and development of housing, including housing for people at all income levels, as well as housing for people with disabilities.

Goal 65. Promote housing opportunities for all persons regardless of race, age, religion, sex, marital status, disability status, ancestry, national origin, or color. To promote housing opportunities for all persons regardless of race, age, religion, sex, marital status, ancestry, national origin, or color.

Portions of the Warner/ Newhope Specific Plan have been identified as housing opportunity sites to accommodate the City’s lower, moderate, and above-moderate income RHNA allocation.

Page 202 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 38 ends

3.2.2 Inclusionary Housing and Density Bonus
New residential units are permitted to be developed in Planning Areas L, A, B, B-2, C, and H, and L. Residential development is subject to Section 21.17 - Inclusionary Housing Program, of the City’s Development Code. Any application for a density bonus shall be subject to Section 21.08.050 (A) - Affordable Housing Density Bonus Incentives of the City’s Development Code, or as otherwise provided in state law.In addition, proposed residential projects within the Warner/Newhope Specific Plan are permitted to achieve a density bonus of 25% for providing affordable housing, per Section 21.08.050 (A), Affordable Housing Density Bonus Incentives, of the City’s Development Code. Accordingly, 20% of the total number of proposed dwelling units can be for lower income households; or 10% of the total number of proposed dwelling units are for very low income households; or 50% of the total number of proposed dwelling units are for qualifying residents, as defined in state law.

3.2.3 Requirements in a Redevelopment Area
Since the Warner/Newhope Specific Plan is located in a
redevelopment project area, 15% of all new or rehabilitated units within the Specific Plan area that are developed by private or public entities, other that the Redevelopment Agency, shall be available at affordable housing cost to, and occupied by, persons and families of low or moderate income. Not less than 40% of the dwelling units required to be available at affordable housing costs shall be reserved for very low-income households.

Long-term covenants shall be required to be maintained on dwelling units at affordable housing costs to, and occupied by, persons and families of low and very low income for not less than 55 years for rental units and 45 years for owner-occupied units.

Previous references in the Specific Plan to redevelopment law, when originally adopted in 2004, are no longer relevant given the dissolution of redevelopment agencies in 2012.

Page 203 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 39 Warner/Newhope Specific Plan

4.1 DEVELOPMENT STANDARDS
This section contains the development standards for the Warner/Newhope Specific Plan. The development standards have been tailored to accommodate the unique mixture of uses on the site. The development standards are largely based upon Title 21 of the City of Fountain Valley Municipal Code; however, any unique standards and guidelines are identified.

All future development within the Warner/Newhope Specific Plan must comply with the standards for each land use category as well as the particular development standards in the Development Code.

4.2 PLANNING AREAS A AND E, AND SUBPANNING AREA A-1, SPORTS AND

FITNESS

4.2.1 Permitted Uses
• For Planning Areas A and A-1, uses that are related to an indoor and outdoor sports and racquet club, fitness center, and health facility, and multifamily residential are permitted, including:
 Gymnasiums.
 Indoor and outdoor courts.
 Pools.
 Weight lifting facilities.
 Health and fitness related classes.
 Training programs.
 Childcare.
 Catering and banquet facilities.
 Conference facilities.
 Restaurant, bar, snack bar.
 Hair salons.
 Sports club related entertainment center.
 Club related offices.
 Sports related retail.

SECTION IV: DEVELOPMENT

STANDARDS

Page 204 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 40 ends

 Tanning beds.
 Physical therapy.
 Massage centers.
 Youth sports facilities.
 Parking.
 Residential is a permitted use in Planning Area A.

• For Planning Area E, uses that are related to an indoor gymnasium are permitted including:
 Gymnasiums.
 Indoor and outdoor courts.
 Pools.
 Weight lifting facilities.
 Health and fitness related classes.
 Training programs.
 Telecommunication facilities Per Section 21.28 of the Fountain Valley Municipal Code.

4.2.2 Precise Plan of Design
• Expansions to existing uses and/or new sports and fitness related structures/facilities shall require the approval of a Precise Plan of Design.

4.2.3 Conditional Use Permit
• The following are permitted with approval of a Conditional Use permit in Planning Area A:
 Catering and banquet facilities.
 Conference facilities.
 Hair salons.
 Massage centers.
 Physical therapy.
 Restaurant, bar, snack bar.
 Self-storage for residents of the Warner/Newhope Specific Plan.
 Residential uses at 20 dwelling units an acre (As determined by combining the acreages and densities for Planning Areas A, B, B-1, B-2, and L).
 Residential density bonus of 25% for the provision of affordable housing per Section 21.08.050 (A) - Affordable Housing Density Bonus Incentives.

Page 205 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 41 Warner/Newhope Specific Plan

4.2.4 Prohibited Uses
• Facilities, uses, or structures not related to the purpose and intent of a sports and fitness club, gymnasium, or residential use.
• Any use not listed or reasonably similar to a use listed as a Permitted Use or Conditionally Permitted Use is prohibited.

4.2.5 Site Development Criteria
• The maximum non-residential intensity shall be as described on Table 1, Land Use Categories, for each Planning Area.

Maximum non-residential intensity is determined by the area of the parcel and the total square footage of the structure (existing plus proposed in the case of additions).
• Maximum residential density in this Planning Area shall be determined by combining the acreages and densities for
Planning Areas A, B, B-1, B-2, and L.
• For non-residential development, aAll future setbacks, building separation, and building height shall be determined on a caseby-case basis during the development review, precise plan of design, and/or conditional use permit process. The nature of the proposed use; the character of the surrounding uses; the height, setbacks, building separation, orientation, unit sizes, common and private open space, design/materials, and
landscaping of existing residential structures in the Specific Plan area; vehicular, emergency, and pedestrian access; parking, noise and light and glare impacts; and the Uniform Building Code shall be used as factors in reviewing projects. • Structures legally established at the time of the adoption of this Specific Plan are considered conforming.
• For parking and loading standards, see Section 3.12.3 of this Specific Plan. The required parking study, as described in Section 3.12.43, shall be used in determining additional parking requirements, if any.
• Unless otherwise stated in this Specific Plan, for residential development, the Very High Density Multiple Dwelling (R-5) zoning district standards of the Fountain Valley Municipal Code shall apply, except for the maximum density standards.

Page 206 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 42 ends

4.3 PLANNING AREAS B AND L, AND SUBPLANNING AREA B-2, HIGH DENSITY

RESIDENTIAL

4.3.1 Permitted Uses
• Multi-family residential up to 20 dwelling units per acre (As determined by combining the acreages and densities for
Planning Areas A, B, B-1, B-2, and L).
• Recreational uses affiliated with the residential units. • Clubhouses affiliated with the residential units.
• Parking.
• Residential accessory uses and structures.
• Affordable Housing.
• Home Businesses per Section 21.42, Home Occupation
Permits, of the Fountain Valley Municipal Code.
• Residential Care Home, small, subject to review by the City of Fountain Valley Fire Department.
• Adult day care, large and small, per Section 21.30.020, Day Care Facilities, of the Fountain Valley Municipal Code. • Day care, small and large family day care homes, per Section

21.30.020, Day Care Facilities, of the Fountain Valley Municipal Code.

4.3.2 Precise Plan of Design
• Expansions to existing uses and/or new structures shall require the approval of a Precise Plan Of Design.

4.3.3 Conditional Use Permit
• The following are permitted with approval of a Conditional Use permit:
 New multi-family residential to a maximum of 20 dwelling units per acre (As determined by combining the acreages and densities for Planning Areas A, B, B-1, B-2, and L).

Page 207 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 43 Warner/Newhope Specific Plan
 Residential density bonus of 25% for the provision of affordable housing per Section 21.08.050 (A) - Affordable Housing Density Bonus Incentives.

4.3.4 Prohibited Uses
• Any use not listed as a Permitted Use or Conditionally Permitted Use is prohibited.

4.3.5 Site Development Criteria
• Planning Areas B and Sub-Planning Area B-1:
 Existing residential structures legally established at the time of adoption of this Specific Plan are recognized as
conforming uses. Expansions or improvements to these
existing residential structures shall be determined on a caseby-case basis during the development review, precise plan of design, and/or conditional use permit process. The nature of the proposed use; the character of the surrounding uses; existing setbacks, building separation, and building height; vehicular, emergency, and pedestrian access; parking, noise and light and glare impacts; and the Uniform Building Code shall be used as factors in reviewing projects.

 Maximum residential density in these Planning Areas shall be determined by combining the acreages and densities for Planning Areas A, B, B-1, B-2, and L.
• Planning Area L:
 Per Section 21.08.040, Residential Zoning District General Development Standards, of the Fountain Valley Municipal Code.
• For parking and loading standards, see Section 3.12.3 of this Specific Plan. The required parking study, as described in Section 3.12.43, shall be used in determining additional parking requirements, if any.

Page 208 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 44 ends

4.4 PLANNING AREAS C, F, AND G,

PROFESSIONAL OFFICE

4.4.1 Permitted Uses
• Business support services.
• Offices, administrative, business, professional.
• Research and Development (R&D).
• Personal storage (mini-storage) is a permitted use in Planning Area G.
• Residential is a permitted use in Planning Area C.

4.4.2 Precise Plan of Design
• Expansions to existing uses and/or new structures shall require the approval of a Precise Plan Of Design.

4.4.3 Conditional Use Permit
• The following are permitted with approval of a Conditional Use permit:
 Medical offices and services (clinics, offices and
laboratories) only in Planning Area C with the approval of a parking study. A maximum of 25% of the building area may be devoted to Medical offices.
 Schools, specialized training and education.
 Photographic studios.
 Automated teller machines (ATMs).
 Parking.
 Telecommunication facilities Per Section 21.28 of the Fountain Valley Municipal Code.

4.4.4 Prohibited Uses
• Any use not listed as a Permitted Use or Conditionally Permitted Use is prohibited.

Page 209 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 45 Warner/Newhope Specific Plan

4.4.5 Site Development Criteria
• The maximum non-residential intensity shall be as described on Table 1, Land Use Categories, for each Planning Area.

Maximum intensity is determined by the area of the parcel and the total square footage of the structure (existing plus proposed in the case of additions).
• Per Section 21.10.040, Commercial and Manufacturing District General Development Standards of the Fountain Valley
Municipal Code for the CP (Professional Office) zoning
category.
• Structures legally established at the time of the adoption of this Specific Plan are considered conforming.
• For parking and loading standards, see Section 3.12.3 of this Specific Plan. The required parking study, as described in Section 3.12.43, shall be used in determining additional parking requirements, if any.
• Unless otherwise stated in this Specific Plan, for residential development, the Very High Density Multiple Dwelling (R-5) zoning district standards of the Fountain Valley Municipal Code shall apply, except for the maximum density standards.

Page 210 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 46 ends

4.5 PLANNING AREAS D, I, AND J,

COMMERCIAL MANUFACTURING

4.5.1 Permitted Uses
• Apparel and fabric products processing.
• Assembly of prepared materials.
• Bakeries.
• Bakery products distribution.
• Electronic and appliance manufacturing.
• Handcraft industries, small-scale manufacturing.
• Laundries and dry cleaning plants.
• Leather, fur products.
• Photographic processing.
• Printing and publishing.
• Research and Development (R&D).
• Self-storage.
• Warehousing, wholesaling, and distribution facilities. • Woodworking shops, including cabinetry.
• Offices, administrative, business, professional.
• Pest control services.

4.5.2 Precise Plan of Design
• Expansions to existing uses and/or new structures shall require the approval of a Precise Plan Of Design.

4.5.3 Conditional Use Permit
• The following are permitted with approval of a Conditional Use permit:
 Antiques, art galleries, collectables.
 Ambulance services.

Page 211 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 47 Warner/Newhope Specific Plan
 Automated teller machines (ATMs).
 Agricultural products processing.
 Banks and financial services.
 Broadcast studios.
 Catering services.
 Childcare centers.
 Chemical product manufacturing.
 Food and beverage product manufacturing.
 Furniture/fixtures manufacturing, cabinet shops.
 Glass product manufacturing.
 Machinery manufacturing.
 Metal products fabrication, machine/welding shops.
 Paper product manufacturing.
 Pharmaceuticals manufacturing.
 Plastics, synthetics, rubber products manufacturing.
 Schools, specialized training and education.
 Studios, dance, martial arts, music, photography.
 Telecommunications facilities, Per Section 21.28 of the Fountain Valley Municipal Code.
 Textile manufacturing.

4.5.4 Prohibited Uses
• Any use not listed as a Permitted Use or Conditionally Permitted Use is prohibited.

4.5.5 Site Development Criteria
• The maximum intensity shall be as described on Table 1, Land Use Categories, for each Planning Area. Maximum intensity is determined by the area of the parcel and the total square footage of the structure (existing plus proposed in the case of additions).
• Per Section 21.10.040, Commercial and Manufacturing District General Development Standards of the Fountain Valley
Municipal Code for the CM (Commercial Manufacturing) zoning category.
• Structures legally established at the time of the adoption of this Specific Plan are considered conforming.
• For parking and loading standards, see Section 3.12.3 of this Specific Plan. The required parking study, as described in

Page 212 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 48 ends

Section 3.12.43, shall be used in determining additional parking requirements, if any.

4.6 PLANNING AREA H, FUTURE

EXPANSION AREA
Planning Area H is currently vacant and allows either office, light industrial, or residential uses. This allows the property owner flexibility when establishing the base use. However, a mixture of uses is not permitted in this area and the property owner may only select one of the base uses for the entire Planning Area. Once the base use is established, then the standards and guidance for that use, as noted in the section, shall govern the future improvements and changes to that property. For instance, if a light industrial base use is established, then the provisions for Commercial Manufacturing shall apply.

4.6.1 Permitted Uses
• For office uses, the permitted uses listed in of Section 4.4 of this Specific Plan (Professional Office) shall apply.
• For light industrial and manufacturing uses, the permitted uses listed in Section 4.5 of this Specific Plan (Commercial Manufacturing) shall apply.
• While the establishment of a residential use is subject to the approval of a Conditional Use Permit (see Section 4.6.3), if established, then the list of permitted uses contained in Section

4.3 of this Specific Plan (High Density Residential) shall apply.

4.6.2 Precise Plan of Design
• Expansions to existing uses and/or new structures shall require the approval of a Precise Plan Of Design.

4.6.3 Conditional Use Permit
• The following are permitted with approval of a Conditional Use permit:
 For offices uses, the conditionally permitted uses listed in Section 4.4 of this Specific Plan (Professional Office) shall apply.

Page 213 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 49 Warner/Newhope Specific Plan
 For light industrial and manufacturing uses, the conditionally permitted uses listed in Section 4.5 of this Specific Plan (Commercial Manufacturing) shall apply.
 Residential use at 36 dwelling units per acre. For residential uses, the conditionally permitted uses listed in Section 4.3 of this Specific Plan (High Density Residential) shall apply.  Residential density bonus of 25% for the provision of affordable housing per Section 21.08.050 (A) - Affordable Housing Density Bonus Incentives.

4.6.4 Prohibited Uses
• Any use not listed as a Permitted Use or Conditionally Permitted Use is prohibited.

4.6.5 Site Development Criteria
• The maximum non-residential intensity shall be as described on Table 1, Land Use Categories, for each Planning Area.

Maximum non-residential intensity for this Planning Area is determined by the area of the legal parcel and the total square footage of the structure (existing plus proposed in the case of additions).
• Except for setbacks and parking, all new professional office structures are required to comply with development standards, and landscaping standards, for the CP (Professional Office) zoning category as listed in the Fountain Valley Municipal Code, Section 21.10.040, Commercial and Manufacturing
District General Development Standards at the time of the application. Setbacks and parking shall be reviewed on a caseby-case basis during the development review, precise plan of design, or conditional use permit process. The nature of the proposed use; the character of the surrounding uses; vehicular, emergency, and pedestrian access; parking, noise and light and glare impacts; and the Uniform Building Code shall be used as factors in determining appropriate setbacks of a proposed project. The required parking study, as described in Section 3.2.3, shall be used in determining additional parking requirements, if any.
• Except for setbacks and parking, all new light industrial structures are required to comply with development standards, and landscaping standards, for the CM (Commercial
Manufacturing) zoning category as listed in the Fountain Valley

Page 214 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 50 ends

Municipal Code, Section 21.10.040, Commercial and
Manufacturing District General Development Standards at the time of the application. Setbacks and parking shall be reviewed on a case-by-case basis during the development review,
precise plan of design, or conditional use permit process. The nature of the proposed use; the character of the surrounding uses; vehicular, emergency, and pedestrian access; parking, noise and light and glare impacts; and the Uniform Building Code shall be used as factors in determining appropriate setbacks of a proposed project. The required parking study, as described in Section 3.12.43, shall be used in determining additional parking requirements, if any.
• All future residential projects shall be reviewed on a case-bycase basis during the development review, precise plan of design, and/or conditional use permit process. In order to determine appropriate and safe residential development for the site, the City shall utilize the character and design of the surrounding uses; the height, setbacks, building separation, orientation, unit sizes, common and private open space, design/materials, and landscaping of existing residential structures in the Specific Plan area; impacts to vehicular, emergency, and pedestrian access; impacts to parking, noise, and light/glare conditions, and; the Uniform Building Code as factors in reviewing projects.
• Future residential uses should be developed to accommodate the adjacent distribution/warehouse and gym while minimizing impacts on residents. The following design criteria should be employed in new residential development proposals:
 Orient the building entrances and the entrances to individual units away from the adjacent distribution/warehousing use to the south (Planning Area D).
 Provide double paned windows to minimize noise impacts.  Minimize or eliminate openings (windows and doors) on the south side of the building.
 Orient private and common open space areas toward the interior of the building (e.g. a courtyard).
 Include additional sound insulation in building walls.

Page 215 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 51 Warner/Newhope Specific Plan

4.7 PLANNING AREA K

4.7.1 Permitted Uses
• Parking
• Residential is a permitted use when included as part of, and immediately adjacent to, a residential development project in Planning Areas A and C and adequate parking spaces are and will be available, consistent with Section 3.1.4 of this Specific Plan.

4.7.2 Precise Plan of Design
• Expansions to existing uses and/or new structures shall require the approval of a Precise Plan Of Design.

4.7.3 Conditional Use Permit
• Not applicable

4.7.4 Prohibited Uses
• Any use not listed as a Permitted Use or Conditionally Permitted Use is prohibited.

4.7.5 Site Development Criteria
• For parking and loading standards, see Section 3.1.3 of this Specific Plan. The required parking study, as described in Section 3.1.4, shall be used in determining additional parking requirements, if any.
• Unless otherwise stated in this Specific Plan, for residential development, the Very High Density Multiple Dwelling (R-5) zoning district standards of the Fountain Valley Municipal Code shall apply, except for the maximum density standards.

Page 216 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 52 ends

4.74.8 GENERAL DEVELOPMENT

CRITERIA
The following development criteria apply to all Planning Areas.

The purpose is to provide uniform performance standards that are designed to minimize and mitigate the potential impacts of development within the City and promote compatibility with surrounding areas and land uses

4.7.14.8.1 Air Pollution
• Per Section 21.16.030, Air Pollution, of the Fountain Valley Municipal Code.

4.7.24.8.2 Noise
• Per Section 21.16.040, Noise, of the Fountain Valley Municipal Code. In this Specific Plan, the standards and requirements of this noise Section shall apply to the parcel based upon the primary use of the designation of the Planning Area.
• Due to the mixture of uses and adjacent light industrial uses, noise impacts to residential uses must be carefully examined.

Measures such as double-paned windows may be required in new developments to ensure compliance with the interior noise standards of the City’s noise ordinance.

4.7.34.8.3 Hazardous Materials Storage
• Per Section 21.16.050, Hazardous Materials Storage, of the Fountain Valley Municipal Code.

4.7.44.8.4 Access
• Per Section 21.18.030, Access, of the Fountain Valley Municipal Code.

4.7.54.8.5 Lighting
• Per Section 21.18.060, Exterior Lighting, of the Fountain Valley Municipal Code.

Page 217 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 53 Warner/Newhope Specific Plan

4.7.64.8.6 Walls, Fences, Screens, Hedges
• Per Section 21.18.070, Fences, Walls, Screens, Hedges, and Shrubs, of the Fountain Valley Municipal Code.

4.7.74.8.7 Screening and Buffering
• Per Section 21.18.080, Screening and Buffering, of the Fountain Valley Municipal Code.

4.7.84.8.8 Refuse Collection Areas
• Per Section 21.18.100, Solid Waste/Recyclable Materials Storage, of the Fountain Valley Municipal Code.

4.7.94.8.9 Utilities
• Per Section 21.18.110, Undergrounding of Utilities, of the Fountain Valley Municipal Code.

4.7.104.8.10 Landscaping
• Per Chapter 21.20, Landscaping, of the Fountain Valley Municipal Code.

4.7.114.8.11 Signs
• Per Chapter 21.24, Signs, of the Fountain Valley Municipal Code.

4.7.124.8.12 Trip Reduction
• Per Chapter 21.26, Trip Reduction and Travel Demand
Management, of the Fountain Valley Municipal Code.

4.7.134.8.13 Wireless Communications
• Per Chapter 21.28, Wireless Communications, of the Fountain Valley Municipal Code. In this Specific Plan, the standards and requirements of Chapter 21.28 shall apply to the parcel based upon the designation of the Planning Area. Wireless
communication facilities are not permitted in the Sports and Fitness and any Residential land use designation.

Page 218 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 54 ends

4.7.144.8.14 Standards for Specific Uses
• Per Chapter 21.30, Standards for Specific Land Uses, of the Fountain Valley Municipal Code.

4.7.154.8.15 Parking
• For parking lot design and loading standards, the provisions of Chapter 21.22, Parking and Loading, of the Fountain Valley Municipal Code shall apply, except when determining the number and amount of parking spaces required.
• In order to determine the amount of parking spaces required, Section 3.2.3 of this Specific Plan shall apply.
• The parking or storage of recreational vehicles (RV) or boats, as defined in the Fountain Valley Municipal Code, is not permitted in the shared parking areas (Planning Areas K, K-1, and I) of the Warner/Newhope Specific Plan.

4.7.164.8.16 Subdivisions
• For any subdivision of land, the provisions of Article VI, Subdivisions, of the Fountain Valley Municipal Code shall apply.

4.7.174.8.17 Inclusionary Housing and Density
Bonus
• In addition to the base residential density permitted in each land use category, projects may apply for a density bonus of 25% for the provision of affordable housing through a
Conditional Use Permit. Residential development is subject to Section 21.17, Inclusionary Housing Program, of the City’s Development Code. Any application for a density bonus shall be subject to Section 21.08.050 (A) - Affordable Housing Density Bonus Incentives of the City’s Development Code, or as otherwise provided in state law.

Page 219 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION IV – Development Standards January 2025 - Page 55 Warner/Newhope Specific Plan
This page intentionally left blank

Page 220 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION V – Implementation January 2025 - Pag
Warner/Newhope Specific Plan

5.1 INFRASTRUCTURE AND SERVICES
This section identifies the providers of public infrastructure and services necessary to support the existing and future development of the Warner/Newhope Specific Plan.

5.1.1 Water Supply
The City of Fountain Valley and the Metropolitan water District furnish water service to the Specific Plan area.

5.1.2 Sewer
The City of Fountain Valley and the Orange County Sanitation District provide sewage disposal facilities. The Orange County Sanitation District provides wastewater treatment facilities.

5.1.3 Solid Waste
The Rainbow Disposal Company, under contract to the City of Fountain Valley, provides solid waste disposal to the City except for hazardous wastes.

5.1.4 Drainage
The City of Fountain Valley and the Orange County Flood Control District will provide off-site drainage facilities.

5.1.5 Fire Protection
Fire protection services are provided by the City of Fountain Valley.

5.1.6 Police Protection
Police protection services are provided by the City of Fountain Valley.

SECTION V: IMPLEMENTATION

Page 221 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION V – Implementation January 2025 - Page 57
Warner/Newhope Specific Plan

5.2 RESPONSIBILITY
The City’s Planning Director shall be responsible for administering the provisions of the Warner/Newhope Specific Plan in
accordance with the provisions of this Specific Plan, the State of California Government Code, Subdivision Map Act, and the City of Fountain Valley General Plan and Municipal Code.

5.3 INTERPRETATIONS
When there is a question or ambiguity regarding the interpretation of any provision of this Specific Plan, the Planning Director has the authority to interpret the intent of such provision.

The Planning Director may, at his/her discretion, refer interpretations to the Planning Commission for its consideration and action. Such a referral shall be accompanied by a written analysis of issues related to the interpretation. The Planning Commission action may be appealed to the City Council.

All interpretation made by the Planning Director may be appealed to the Planning Commission in accordance with the appeal procedures set forth in the Development Code.

5.4 SPECIFIC PLAN AMENDMENT
All modifications or amendments to the Specific Plan shall be processed in accordance with the requirements of Chapter 21.34, Amendments, of the City of Fountain Valley Municipal Code.

5.5 SEVERABILITY
If any section, subsection, sentence, clause, or phrase of this Specific Plan, or future amendments or additions hereto, is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this plan.

5.6 LAND USE DESIGNATIONS
The locations of the land use designations are approximate and generally follow either parcel lines or building footprints. Where parking and access are shared, the land use designations generally follow building footprints and not legal parcel lines.

Page 222 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 58 ends

For the purposes of reviewing development proposals in Planning A, A-1, B, B-2, C, D, E, F, G, H, and I, and K, the land use designations surrounding the building pad shall extend to the boundaries of the legal parcels. However, any shared parking that is proposed to be eliminated by future projects must be replaced at a one-to-one ratio within the Specific Plan area.

Approved modifications in building footprints shall result in an automatic adjustment to the boundaries of the land use
designations and planning areas maps as a minor amendment to the Specific Plan.

5.7 PERMITS AND PROCESSING

5.7.1 Applications, Processing, And Fees
• Per Chapter 21.32, Applications, Processing, And Fees, of the City of Fountain Valley Municipal Code.

5.7.2 Conditional Use Permits
• Per Chapter 21.36, Conditional Use Permits, of the City of Fountain Valley Municipal Code.

5.7.3 Development Agreements
• Per Chapter 21.38, Development Agreements, of the City of Fountain Valley Municipal Code.

5.7.4 Development Review
• Per Chapter 21.40, Development Review, of the City of Fountain Valley Municipal Code.

5.7.5 Home Occupation Permits
• Per Chapter 21.42, Home Occupation Permits, of the City of Fountain Valley Municipal Code.

5.7.6 Precise Plan Of Design
• Per Chapter 21.44, Precise Plan Of Design, of the City of Fountain Valley Municipal Code.

Page 223 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION V – Implementation January 2025 - Page 59
Warner/Newhope Specific Plan

5.7.7 Specific Plans
• Per Chapter 21.46, Specific Plans, of the City of Fountain Valley Municipal Code.

5.7.8 Temporary Use Permits
• Per Chapter 21.48, Temporary Use Permits, of the City of Fountain Valley Municipal Code, except that temporary homes are prohibited.

5.7.9 Variances
• Per Chapter 21.50, Variances, of the City of Fountain Valley Municipal Code.

Page 224 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 60 ends

This page intentionally left blank

Page 225 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendices January 2025 - Page 61
Warner/Newhope Specific Plan

APPENDICES

Page 226 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 62 ends

This page intentionally left blank

Page 227 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix A – Glossary of Terms January 2025 - Page 1
Warner/Newhope Specific Plan
Per Chapter 21.90, Definitions/Glossary, of the City f Fountain Valley Municipal Code with the addition of the following definitions:

Intensity, Building: For residential uses, the actual number or the allowable range of dwelling units per net or gross acre. For nonresidential uses, the actual or the maximum permitted floor area ratios (FARs).

Land Use Classification: A system for classifying and
designating the appropriate use of properties. The land use classifications for the Warner/Newhope are defined in the Specific Plan itself.

Parking, Shared: A public or private parking area used jointly by two or more uses.

Planning Area: Specific zones or districts that contain explicit uses or groups of uses. Taken together, the twelve Planning Areas constitute the entire Warner/Newhope Specific Plan.

Qualified Residents: Residents who are eligible to qualify for affordable housing. Qualifying residents are classified as “Very Low,” those earning up to 50% of the County’s median income; “Low,” those earning between 50-80% of the County’s median income, and; “Moderate,” those earning between 80-120% of the County’s median income.

Right-of-Way: A strip of land occupied or intended to be occupied by certain transportation and public use facilities, such as roads, railroads, and utility lines.

Specific Plan: A tool authorized by Government Code §65450 et seq. for the systematic implementation of the general plan for a defined portion of a community. A specific plan must specify in detail the land uses, public and private facilities needed to support the land uses, phasing of development, standards for the conservation, development, and use of natural resources, and a APPENDIX A – GLOSSARY OF TERMS

Page 228 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

program of implementation measures, including financing measures.

Zoning: The division of a city or county by legislative regulations into areas, or zones, that specify allowable uses for real property and size restrictions for buildings within these areas; a program that implements policies of the General Plan.

Page 229 ends

City of Fountain Valley
Warner/Newhope Specific Plan
SECTION II – Introduction September 2004 - Page
3 Warner/Newhope Specific Plan
This page intentionally left blank

Page 230 ends
Page 231 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix B – Parking Study January 2025 - Page 1
Warner/Newhope Specific Plan
APPENDIX B – PARKING STUDY

Page 232 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

This page intentionally left blank

Page 233 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix C – Mitigated Negative Declaration January 2025 - Page 1 Warner/Newhope Specific Plan
The following are provided Uunder a separate cover:.
- Mitigated Negative Declaration (September 21, 2004)
- General Plan EIR (November 21, 2023, State Clearinghouse #2022100563), with amendments determined to be consistent in accordance with CEQA Guidelines Section 15183 and California Public Resources Code section 21083.3.

APPENDIX C – MITIGATED NEGATIVE

DECLARATIONENVIRONMENTAL

Page 234 ends

City of Fountain Valley
Warner/Newhope Specific Plan
eptember 2004– January 2025 PlaceWorks
This page intentionally left blank

Page 235 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix D – Development Entitlement History January 2025 - Page 1 Warner/Newhope Specific Plan
The following presents the development entitlement history of development in the Specific Plan.

Event Action
Los Caballeros Sports Club established CUP 231
Plaza Del Lago established CUP 421
Los Caballeros restaurant, banquet facilities, and 44 unit sports motel (Phase 1) permitted
CUP 513
Office condominiums permitted CUP 555
Office condominiums in Plaza Del Lago permitted CUP 604 Entrance structure permitted CUP 630
Office/industrial building established CUP 642
84 units and 24 units (Phase 2) established CUP 650
Parking structure and gymnasium expansion permitted CUP 650R Tow office buildings established CUP 743
21 unit condominium (Phase 3) complex established CUP 791 Yardley Building established CUP 799
123 unit condominium complex on Warner (Phase 4)
established
CUP 857/TT
12836
Office and storage complex established CUP 1327
APPENDIX D – DEVELOPMENT

ENTITLEMENT HISTORY

Page 236 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

This page intentionally left blank

Page 237 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix E – Reciprocal Parking and Access Agreement January 2025 - Page 1 Warner/Newhope Specific Plan
APPENDIX E – RECIPROCAL PARKING

AND ACCESS AGREEMENT

Page 238 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

This page intentionally left blank

Page 239 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix F – Adopting City Council Ordinance January 2025 - Page 1 Warner/Newhope Specific Plan
APPENDIX F – ADOPTING CITY

COUNCIL ORDINANCE

Page 240 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

This page intentionally left blank

Page 241 ends

City of Fountain Valley
Warner/Newhope Specific Plan
Appendix G – Non-Residential Intensity Analysis January 2025 - Page 1 Warner/Newhope Specific Plan
The following table provides a breakdown of the existing and permitted non-residential intensities in the Specific Plan. The maximum overall non-residential intensity for the Specific Plan, as expressed in Floor Area Ratio (FAR), is .52. The maximum FAR for each parcel is described by Planning Area and expresses existing conditions and the potential additional building area.

APPENDIX G – NON-RESIDENTIAL

INTENSITY ANALYSIS
Planning
Area Land Use
Parcel
Size
(acres) Sq Ft. of parcel
Sq. Ft. of
Existing
Buildings
Existing
FAR
Max FAR in
SP
Total Sq. Ft. of buildings
if Max FAR from SP
applied
Additional Square
Footage using Max FAR
from SP
A
Los Caballeros Sports
Club 13.202 575,079.12 190,389 0.33 0.50 287,539.56 97,150.56 C
Office (Plaza Del
Lago) 3.047 132,727.32 41,520 0.31 0.35 46,454.56 4,934.56 D
Manufacturing
(Yardley) 0.953 41,512.68 26,500 0.64 0.65 26,983.24 483.24 E Gym 0.444 19,340.64 16,439 0.85 0.85 16,439.54 0.54
F Office 0.821 35,762.76 14,000 0.39 0.40 14,305.10 305.10 G Storage/Office 0.358 15,594.48 12,000 0.77 0.80 12,475.58 475.58 H Vacant 1.175 51,183.00 25,000 0.49 0.50 25,591.50 591.50 I Manufacturing 1.213 52,838.28 19,800 0.37 0.40 21,135.31 1,335.31 J Public Storage 2.780 121,096.80 86,000 0.71 0.75 90,822.60 4,822.60 Totals 23.993 1,045,135.08 431,648 0.41 0.52 541,747.01 110,099.01 Non-Residential Intensity Analysis
Existing Conditions Permitted Buildout Conditions

Page 242 ends

City of Fountain Valley
Warner/Newhope Specific Plan

Page 2 ends

This page intentionally left blank

Page 243 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: January 21, 2025
Members of the City Council
SUBJECT: A Public Hearing to consider Code Amendments 25-01, 25-02 and 25-03 to the Crossings Specific Plan, Southpark Specific Plan and Warner/Newhope Specific Plan, respectively to allow for new/additional residential uses, consistent with the General Plan and 2021-2029 Housing Element
Three-Year Strategic Goals
☐ Enhance the culture and environment of “A Nice Place to Live” ☐ Attract and retain revenue producing businesses
☐ Achieve fiscal stability in accordance with the 20-Year Financial Plan ☐ Attract and retain quality staff
☒ Not applicable

EXECUTIVE SUMMARY
In November and December of 2023, the City adopted its Comprehensive Update to the General Plan, including an updated Housing Element and rezones of several property sites.

The City now has until February 12, 2025 to rezone the remainder of the opportunity sites listed in the Housing Element to address its Regional Housing Needs Assessment Allocation (RHNA) for 2021 – 2029 and retain a certified Housing Element. The City’s RHNA allocation for this period is 4,839 housing units. The City’s primary responsibility as part of the RHNA is to find adequate sites to accommodate these new housing units and to zone them accordingly. The City has three remaining sites to rezone, all of which are in Specific Plan Areas: they include the Crossings, Southpark and Warner/Newhope Specific Plans.

The environmental analysis for the rezones was prepared as part of the Environmental Impact Report (EIR) for the General Plan and is included as an attachment to this Staff Report. If adequate rezoning is not conducted by the February 12, 2025 deadline, the City’s Housing Element will fall out of compliance until such time that the rezoning is completed.

The Planning Commission considered the Code Amendments at its regularly scheduled meeting on January 8, 2025 and by a vote of 5-0, recommended that the City Council approve Code Amendments 25-01, 25-02 and 25-03.

DISCUSSION
The City’s certified Housing Element identified three areas zoned with Specific Plans to be amended to allow for new or additional housing units to meet the City’s RHNA obligation.

Below is a summary table of the residential capacity identified for each Specific Plan area

Page 244 ends

Council Action Request
City Council Meeting January 21, 2025

Page 2 ends

and a written summary detailing the changes that would be approved through the Specific Plan Amendment process.

Specific Plan/Site
Portion of
Acreage
Suitable for
Residential
Density
du/ac
Housing Capacity by Income Level
Total
Very
Low/Low Med
Above
Moderate
FV Crossings 48.37 22 550 110 440 1,100
Southpark 35.35 31 570 110 420 1,100
Los Cab Sports Village1 14.74 45 99 200 377 676

1. While the Housing Element listed 663 units, the General Plan considered 676 units and accounted for the potential application of a 20% density bonus. Accordingly, the number of above moderate and total units is shown consistent with the 676 figure.

Crossings Specific Plan
The Crossings Specific Plan is divided into four Districts with an additional Activity Core Overlay that encompasses multiple Districts. Currently, the Crossings Specific Plan allows for a total of 491 residential units focused in the Activity Core and Workplace Neighborhood Districts. The intent of allowing for residential uses in the Crossings area was to create an active and vibrant community that could live close to retail/commercial uses and to assist with the revitalization of the area.

Consistent with the General Plan and 2021-2029 Housing Element, Code Amendment 25-01 would increase the number of residential units permitted or conditionally permitted in the Crossings area from 491 to 1,100 units.

Southpark Specific Plan
The Southpark Specific Plan was identified in the Housing Element as an opportunity site that could accommodate 1,100 new housing units. The land is currently vacant and the Specific Plan area has previously identified these remaining sites for a wide range of uses including certain types of retail, office and industrial businesses. The remainder of the Specific Plan is zoned for similar uses and contains large industrial buildings and a retail center anchored by Costco.

The currently vacant portions of the Specific Plan area could all be utilized for residential purposes, however it is more likely that, if constructed, the new homes would be located on a portion of the 35.35 acre site and the remainder would be utilized for mixed-use or retail. In terms of development standards that would apply to any possible future residential development, there are two options: create a unique set of standards for this particular area or utilize standards already found in the Fountain Valley Municipal Code. Staff is recommending the latter, with use of the R-5 Very High Density Residential Zone standards in addition to the MU-2 Mixed Use 2 standards. Depending on market conditions, the property owner or potential developer would have the option of utilizing either or both of the zoning districts throughout the 35 acre site. Staff anticipates that the MU-2 standards may be used at the corners of Euclid/Talbert and/or Euclid/Slater which would be ideal locations for retail development, while the R-5 zoning standards would be used in the mid-block area.

Page 245 ends

Council Action Request
City Council Meeting January 21, 2025

Page 3 ends

As this is a large vacant site and as market conditions continue to change, future development may require some refinement to the Specific Plan, based on project specifics, demographics and demand for residential/retail uses at the time of development.

One additional change of significance is the allowance for land dedication in-lieu of providing inclusionary housing on-site. The City’s inclusionary housing ordinance currently requires that 15% of the units (calculated on base density) in a project of 10 or more homes be affordable to low and very-low income residents. The ordinance further allow for an in-lieu fee to be paid as an alternative. The owner of the impacted land in the Southpark Specific Plan area would also like the option of dedicating land to the City as a third alternative. Any land dedication, as proposed, would need to meet certain criteria, including that it: be of adequate size and capacity to accommodate the required number of affordable units; carry the appropriate zoning; carry appropriate infrastructure at the time of dedication; and that is otherwise generally suitable for residential development and at a value that in line with the number of affordable units due to the City.

Consistent with the General Plan and 2021-2029 Housing Element, Code Amendment 25-02 would allow up to 1,100 housing units as part of standalone residential or mixed-use projects in the Southpark area.

Warner/Newhope Specific Plan
The Warner/Newhope Specific Plan area consists office and residential uses and the Los Caballeros Sports Village (Los Cab). The owner of Los Cab indicated through the Housing Element Update process, an interest in converting the Sports Club area into residences. As such, the City indicated that the site and some surrounding areas posed as an opportunity site for 676 homes over 14.74 acres. Consistent with the General Plan and 2021-2029 Housing Element, Code Amendment 25-03 would add capacity for an additional 676 housing units and add residential uses as permitted in Planning Areas A, C and K, in which Los Cab and parking areas are located. It also defers development standards to those existing in the R-5 zone.

FINANCIAL REVIEW
There is no direct financial impact related to this action.

PUBLIC NOTIFICATION
Public hearing notices were mailed to all property owners within 1000 feet of properties considered for rezoning. The item was also published in the Orange County Register and notices were posted at City Hall, Recreation Center and the Fountain Valley Library.

ENVIRONMENTAL IMPACT REVIEW
An Environmental Impact Report (EIR) was prepared by PlaceWorks under the direction of the City for the General Plan and Housing Element Updates. The adopted EIR analyzed the environmental impacts of building under the General Plan and Housing Element Updates pursuance to the California Environmental Quality Act (CEQA) and the Fountain Valley City Council certified the General Plan Update EIR on November 21, 2023. The proposed ordinances are consistent with the certified EIR and no additional CEQA review was found be required.

Page 246 ends

Council Action Request
City Council Meeting January 21, 2025

Page 4 ends

ATTORNEY REVIEW
The Attorney for the City has reviewed and approved the attached ordinances.

ALTERNATIVES
Alternative No. 1: Approve the Introduction-First Read of ordinances approving Code Amendments 25-01, 25-02 and 25-03 related to the Crossings, Southpark and Warner/Newhope Specific Plans, respectively.

Alternative No. 2: Do not approve the Code Amendments and provide further direction to Staff.

Alternative No. 3: Continue the item for further consideration.

RECOMMENDATION
Staff is requesting City Council approval of Alternative No. 1: Approve the Introduction-First Read of an ordinance approving Code Amendments 25-01, 25-02 and 25-03 related to the Crossings, Southpark and Warner/Newhope Specific Plans, respectively.

Prepared by: Omar Dadabhoy, Deputy City Manager/Community Development Director
Approved by: Maggie Le, City Manager
Attachments: 1: Ordinance approving Code Amendment 25-01 regarding the Crossings Specific Plan

2. Ordinance approving Code Amendment 25-02 regarding the Southpark Specific Plan

3. Ordinance approving Code Amendment 25-03 regarding the Warner/Newhope Specific Plan

4. General Plan Environmental Impact Report and related documents (https://www.fountainvalley.gov/1282/General-PlanUpdate)

Page 247 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: February 4th, 2025 Members of the City Council
SUBJECT: Request Approval of the following: 1. Follow the Bidding Exceptions per FVMC 2.36.070 (a)(4) and authorize Staff to purchase and equip a 2028 Pierce Enforcer fire engine in the amount of $1,200,000, and 2. Authorize Staff to dispose of one surplus 2001 American La France fire engine by means following the guidelines of the Carl Moyer grant process to receive reimbursement funds totaling $187,331.00 upon receipt of the 2028 Pierce fire engine.

Three-Year Strategic Goals
☐ Enhance the culture and environment of “A Nice Place to Live” ☐ Achieve fiscal stability by evaluating processes, and attract and retain revenue producing businesses/opportunities.
☐ Attract and retain quality staff through best practices and trends ☒ Maintain, build, and modernize infrastructure to support growth and future needs of the City
☐ Not applicable
EXECUTIVE SUMMARY:

Staff is requesting that the City Council waive the bidding requirements pursuant of FVMC

2.36.070 (a)(4) and authorize staff to issue the purchase order totaling $1,089,145.78 to South Coast Fire Equipment for the purchase of the following fire engine through the existing cooperative contract with Sourcewell, and authorize staff to dispose of the existing apparatus through the Carl Moyer grant process.

1. One (1) new Pierce Enforcer Fire Engine for $1,089,145.78 The 2028 Pierce fire engine will replace the 2001 American La France fire engine unit number 8210. The fire department adopted the National Fire Protection Association’s (NFPA) recommendation to remove apparatus from front-line service after 15 years of frontline service. The 2001 American La France fire engine will exceed NFPA 1901’s recommendation to remove the apparatus from all emergency services, including reserve status, before the acquisition of the 2028 Pierce fire engine. The Fire department is a

Page 248 ends

Council Action Request
2028 Pierce Fire Engine Purchase

Page 2 ends

recipient of the Carl Moyer Grant from the South Coast Air Quality Management District AQMD for the amount of $187,331. The grant from AQMD will help offset the cost of the new Pierce fire engine, benefiting both the department and the environment. The grant specifies that the Pierce fire engine must meet specific emissions standards, and the dismantling of engine 8210 must be completed in an environmentally responsible manner.

The funds for the grant will be reimbursed to the city when the new fire engine is received by the city, and all requirements of the grant have been met.

Staff recommends to: 1. Follow the bidding exceptions per FVMC 2.36.070 (a)(4) and authorize staff to purchase and equip a 2028 Pierce Enforcer fire engine in the Amount of $1,200,000, and 2. Authorize staff to dispose of one surplus 2001 American La France fire engine as outlined in the Carl Moyer AQMD grant process.

DISCUSSION:

The new 2028 Pierce fire engine will replace the 2001 American La France fire engine unit 8210. The fire department has set a 15-year life cycle for front-line service, with an additional 10 years of reserve status. The 2001 American La France has completed its life cycle with the city. The fire department received the Carl Moyer Grant contract from the South Coast Air Management District AQMD for $187,331. The AQMD award will partially reimburse the city for the cost of the new fire engine, benefiting both the department and the environment. The award requires that fire engine 8210 fulfill specified emissions requirements and be dismantled in an environmentally responsible manner.

Staff recognizes the importance of fire engines that provide reliable service. Having higher-quality fire engines reduces the amount of time that front-line equipment is out of service and provides more predictable and acceptable fleet maintenance costs. The Apparatus Committee researched many fire apparatus manufacturers and determined that Pierce builds a quality product that best serves the city. Part of the apparatus committee’s research included talking with other agencies within the county about which manufacturer they use and found that most agencies within Orange County have Pierce fire apparatus because of their proven performance record, safety, and long-term reliability. As such, the fire department recommends continuing with the Pierce product, which has now been vetted with the purchase of one 2023 fire engine, the 2020 tractordrawn aerial (tiller truck), and one 2017 Pierce fire engine.

Staff has identified an existing cooperative contract through Sourcewell (Contract #113021), formerly the National Joint Powers Alliance (NJPA), that can be used for the purchase of these vehicles. Sourcewell combines the buying power of 50,000 government, education, and nonprofit organizations through nationally competitively solicited cooperative contracts. Cooperative purchasing is “Procurement conducted by, or on behalf of, one or more Public Procurement Units” as defined by the American Bar Association Model Procurement Code for State and Local Governments. Sourcewell’s rigorous process streamlines the procurement process by developing Invitation for Bids and Request for Proposals for national, competitive solicitations that meet or exceed local

Page 249 ends

Council Action Request
2028 Pierce Fire Engine Purchase

Page 3 ends

requirements. Sourcewell issued a Request for Proposal (RFP), which was publicly advertised in October of 2021 for the procurement of Class 4-8 Chassis with Related Equipment, Accessories, and Services. The cooperative contract for Firefighting Apparatus and Fire Service Vehicles expires February 12, 2026, and is available for use by government and state agencies, including cities. The City can utilize the cooperative contract to purchase the vehicles at a competitive price in compliance with the City’s purchasing policy. Section 2.36.070 (a)(4) of the Fountain Valley Municipal Code authorizes the procurement of goods and services without formal bidding under the following circumstance: “When participating in cooperative contracts with another government agency.” The total cost to purchase the new Pierce fire engine from South Coast Fire Equipment, utilizing the existing cooperative contract with Sourcewell is $1,089,145.78. Replacing the existing fire engine (Unit No. 8210) will support the City’s strategic goal of maintaining, building, and modernizing infrastructure to support the growth and future needs of the City.

Electronic Outfitting New Fire Engine
Final outfitting of the new fire engine with equipment such as, but not limited to, radios, chargers, and onboard computer systems specific to fire apparatus within Orange County will be required once the apparatus is delivered to Fountain Valley. Staff recommends the use of Johnson Equipment Company, which has performed this type of work on other Fountain Valley Fire Department emergency vehicles and was significantly less expensive than one of their competitors. The electronics outfitting will take place after an approximate 44-month build process.

JOHNSON EQUIPMENT $ 32,528.39

FINANCIAL REVIEW
The cost to purchase and equip the Pierce fire engine is listed below. Included with the listed engine price is a 100% prepay discount, which is offered at contract signing or with a lease. A performance bond ensures that the city will receive its money back should the builder default on the build contract and will be paid for by Pierce.

Equipment Cost
2028 Pierce Fire Engine with a 100% pre-payment discount ($148,409.00) 1,089,145.78
Radios and Electronics Installation (Johnson Equipment) 32,528.39 Total Vehicle & Modification Cost 1,121,674.17
Contingancy funding 78,325.83
Grand Total $ 1,200,000

Page 250 ends

Council Action Request
2028 Pierce Fire Engine Purchase

Page 4 ends

The cost of the new fire engine will be expended in the Fire Fighting & Rescue Equipment account within the Fleet Management Internal Service Fund, 112.60.60052.55601. A sufficient budget exists within this account to fund the pre-payment of the Pierce Fire Engine.

When the 2028 Pierce Enforcer PUC is delivered to the city of Fountain Valley and inspected by a designated AQMD representative, all aspects of the Carl Moyer Grant are fulfilled. The City of Fountain Valley will be awarded the amount of $187,331 from the South Coast Air Management District AQMD.

PUBLIC NOTIFICATION:

Not applicable.

ENVIRONMENTAL IMPACT REVIEW:

The purchase of the 2028 Pierce fire engine and the disposal of the 2001 American La France fire engine will have a positive environmental impact. The 2028 Pierce fire engine complies with California Air Resources Board (“CARB”) emissions, reducing pollutants like nitrogen oxides and particulate matter. Additionally, the Carly Moyer AQMD Grant requires the 2001 American La France fire engine to be dismantled in an environmentally responsible manner.

ATTORNEY REVIEW:

The City Attorney drafted a contract that provides standard terms and conditions, which were reviewed by staff and approved by the City Attorney.

ALTERNATIVES:

Alternative No. 1 – Authorization to purchase and equip a 2028 Pierce Enforcer PUC fire engine in the amount of $1,200,000 2), Authorize Staff to dispose of one surplus American La France fire engine by means that meets the requirements of the Carl Moyer grant process.

Alternative No. 2 - Do not approve this action and direct staff to research alternatives.

Page 251 ends

Council Action Request
2028 Pierce Fire Engine Purchase

Page 5 ends

RECOMMENDATION:

Staff recommends the following: 1) Follow the bidding exceptions per FVMC 2.36.070 (a)(4) and authorize staff to purchase and equip a 2028 Pierce Enforcer fire engine in the amount of $1,200,000, and 2), authorize staff to dispose of one surplus 2001 American La France fire engine (#8210) by means that best meet the requirements of the Carl Moyer grant process for the reimbursement funding of $187,331.

Prepared by: Jeremy Hemkin, Fire Captain
Prepared by: Matthew Barr, Battalion Chief
Reviewed by: William McQuaid, Fire Chief
Procurement Review by: Amanda McCall, Purchasing Manager Fleet Review by: Scott Smith, Director of Public Works/City Engineer Fiscal Review by: Ryan Smith, Finance Director
Approved by: Maggie Le, City Manager
Attachment 1: South Coast Fire Equipment Pierce fire engine proposal Attachment 2: Contract For Sale of Goods
Attachment 3: Johnson Equipment electronics quote
Attachment 4: Pierce Fire Engine Specification
Attachment 5: Carly Moyer Grant Contract

Page 252 ends

Extension
( 1 )
$ 1,147,343.66
Sales Tax @ 8.750% $ 100,392.57
$ 1,247,736.23
Performance Bond $ 2,793.84
California Tire Fee $ 10.50
Consortium Fee Not Applicable $ -
$ 1,250,540.57
The above proposal price shall be valid until or extended in writing by South Coast Fire Equipment.

Said apparatus and equipment are to be built by the manfacturer and shipped in accordance with the specifications hereto attached, delays due to strikes, war or international conflict, failures to obtain chassis, materials, inability to obtain labor, supplies or manufacturing facilities, epidemics, acts of God, or causes beyond our control not preventing, delivery would be 44 months after receipt of this order and acceptance thereof at our office in Corona, California, and deliver to you at the City of Fountain Valley

PROPOSAL FOR FURNISHING FIRE APPARATUS
for final acceptance by South Coast Fire Equipment, Inc., at its corporate office in Corona, California, Each
January 9, 2025
Fountain Valley Fire Department
The undersigned is prepared to provide for you, our customer, upon an order being placed by you, the apparatus and equipment herein named and for the following prices:

Fountain Valley, CA 92708
17737 Bushard St.

One
. The buyer must make the payment
within 15 days to obtain the full discount. Payments not received with in the 15 days are subject to an adjustment to the Total Purchase Price for the prepayment. $ 1,147,343.66
Pierce Enforcer 1500 GPM PUC Pumper per
Sourcewell Contract #113021 Bid 252
$ 100,392.57
$ 2,793.84

TOTAL PURCHASE PRICE
$ -
02/15/25
Payment Terms - Payment is due of the Total Purchase Price at time of delivery. Changes to the specifications since the time of order can added to the Total Purchase Price or invoiced on a separate invoice. The final sales tax amount will be determined at time of delivery based on the tax rate at that time. An increase or decrease in cost will be reflected on the final invoice.

If the customer would desire to pay for the apparatus within 15 days of the purchase order being accepted the

APPARATUS COST WITH TAX
$ 10.50
$ 1,247,736.23
$ 1,250,540.57
If the customer so desires to purchase the Product described in the Proposal and the attached specifications, prior to the expiration date listed above, the Customer shall sign and return this proposal. The Customer can then provide their choice of document for entering into the agreement by providing a Purchase Order, or signing a Contract with South Coast Fire Equipment, 3150 Palisades Dr. Corona, CA 82878 as the seller.

Total Purchase Price would be reduced to $1,089,145.78
The specifications herein contained shall form a part of the final contract and are subject to changes desired by the purchaser, provided such alterations are interlined prior to the acceptance by the company of the order to purchase, and provided such alterrations do not matterially affect the cost of the construction of the apparaus

Page 253 ends

The proposal for fire apparatus conforms with all Federal Department of Transportation (DOT) rules and regulations in effect at the time of bid, and with all National Fire Protection Association (NFPA) guidelines for Automotive Fire Apparatus as published at time of bid, except as modified by customer specifications Any increased costs incurred by the first party because of future changes in or additoinas to said DOT or NFPA standards will be passed along to the customer as an addition to the price set forth above. Unless accepted within 30 days from the specified date, the right is reserved to withdraw this proposition.

Respectfully Submitted,
South Coast Fire Equipment, Inc.

Sales Representative Signature:____________________________________ Title:_______________ Date:____________________
I, ___________________ authorized representative of
________________________ agrees to purchase the
proposed product(s) and agree to the terms and conditions of this proposal and the specifications hereto attached.

The Seller will document any such updated price for the customer's approval before proceeding and provide an option to cancel the order without charge if the updated price is not accepted.

Adrian Beyer
Force Majeure - South Coast Fire Equipment shall not be responsible nor deemed to be in default on accountof delays in performance due to causes which are beyond the seller's and manufacturer's control and make the seller's performance impracticable, including but not limited to wars, insurrections, strikes, riots, fires, storms, floods, other acts of nature, explosions, earthquakes, accidents, any act of government, delays in transportation, inability to obtain necessary labor supplies or manufacturing facilities, allocation regulations or orders affecting materials, equipment, facilities or completed products, failure to obtain any required license or certificates, acts of God or the public enemy or terrorisim, failure of transportation, epidemics, quarantine restrictions, failure of vendors (due to causes similiar to those within the scope of the clause) to perform their contracts or labor troubles causing cessation, slowdow, or interruption of work.

Cancellation/Termination. In the event this Agreement is cancelled or terminated by the purchasing party before completion, South Coast Fire Equipment (SCFE) may charge a cancellation fee. The following charge schedule based on costs incurred may be applied: (a) 10% of the Purchase Price after order is accepted and entered by Manufacturer; (b) 20% of the Purchase Price after completion of approval drawings, and; (c) 30% of the Purchase Price upon any material requisition. The cancellation fee will increase accordingly as costs are incurred as the order progresses through engineering and into manufacturing. SCFE endeavors to mitigate any such costs through the sale of such Product to another purchaser; however Customer shall remain liable for the difference between the Purchase Price and, if applicable, the sale price obtained by SCFE upon sale of the Product to another purchaser, plus any costs incurred by SCFE to conduct any such sale.

Due to global supply chain constraints, any delivery date contained herein is a good faith estimate as of the date of this order/contract, and merely an approximation based on current information. Delivery updates will be made available, and a final firm delivery date will be provided as soon as possible.

Persistent Inflationary Environment: If the Producer Price Index of Components for Manufacturing (www.bls.gov Series ID: WPUID6112) ("PPI") has increased at a compounded annual growth rate of 5.0% or more between the month Pierce accepts the order (Order Month") and a month 14 months prior to the then predicted Ready For Pickup date ("Evalution Month"), then pricing may be updated in an amount equal to the increase in PPI over 5.0% for each year or fractional year between the Order Month and the Evaluation

Page 254 ends

Extension
( 1 )
$ 1,147,343.66
100% Prepayment Discount $ (148,409.00)
APPARATUS COST $ 998,934.66
Sales Tax @ 8.750% $ 87,406.78
Performance Bond $ 2,793.84
California Tire Fee $ 10.50
Consortium Fee Not Applicable $ -
$ 1,089,145.78
Less 100% pre-payment at Contract Signing $ 1,089,145.78 BALANCE DUE AT DELIVERY $0.00
require no money down and no payments for one (1) year if desired.

Discount for the 100% pre-payment option includes discounts for the chassis, interest, aerial (if applicable), and flooring charges.

Any item added after this option is elected will come at additional cost and will be added to the final invoice.

Thirteen
$ 87,406.78
$ 2,793.84
If a 100% pre-payment were made at contract signing, the following discount would be applied to the final invoice:

Each
Pierce Enforcer 1500 GPM PUC Pumper
per Sourcewell Contract #113021 Bid
252 $ 1,147,343.66
Fountain Valley Fire Department
100% Pre-Payment Option
January 9, 2025
$ (148,409.00)
$ 998,934.66
*
100% PRE-PAYMENT DISCOUNT SHOWN ABOVE IS AVAILABLE IN TWO WAYS:
a)
b)
*
If your department makes a 100% cash pre-payment at contract signing.

If your department signs up for a lease-purchase with Pierce Financial Solutions. This would $ 10.50
TOTAL PREPAY PURCHASE PRICE $ 1,089,145.78
$0.00
$ 1,089,145.78
$ -

Page 255 ends
Page 256 ends
Page 257 ends
Page 258 ends
Page 259 ends
Page 260 ends
Page 261 ends
Page 262 ends
Page 263 ends

Quote
Date
6/17/2024
Quote #
5661
Bill To:

City of Fountain Valley
10200 Slater Avenue
Fountain Valley CA 92708
Ship To:

City of Fountain Valley Fire
Department
17737 Bushard Street
Fountain Valley, CA 92708
P.O. No. Terms
Net 30
Rep
GJ
FOB
Perris, Ca
Project Make / Model / Year
2027 Type 1
Signature Total
Subtotal
test Sales Tax (8.0%)
7 Qty Item Description Each Total

1.00 Egis 7021B Egis Contactor, 250 Amp, 12/24 V, Sealed 113.12 113.12T

1.00 BS 2301B Blue Sea BusBar 10 Gang Common Bus 14.42 14.42T

1.00 BS 5029B Blue Sea Fuse Block STBlade 12circ w/cvr 33.43 33.43T

1.00 BS 5028B Blue Sea Fuse Block STBlade 6circ w/cvr 26.57 26.57T

1.00 BS 7189B Bussman 285 Series Surface mount breaker, 150 Amp 35.94 35.94T Troy FP-MXTL2500 Troy Products 3" faceplate for 2500 and 5000 remote radios

1.00 37.80 37.80T
Troy FP-BKM150-R Troy Products 3" Faceplate for Bendix King M150 Remote Radio

1.00 37.80 37.80T
Sig US-67D-LAC Sigtronics Dual Radio 6 position Intercom System, LA County

1.00 1,215.50 1,215.50T

1.00 Sig MRIM-2 Sigtronics Mobile Radio Interface Module 335.40 335.40T

4.00 Sig SE-8 Sigtronics Behind the head Headset 341.90 1,367.60T Ott P3-31611 Otto P3 Red Momentary Switch (two for PA, 1 for modem reset)

3.00 26.36333 79.09T

2.00 Sig 800122 Sigtronics Push to talk switch with blue box and cover 30.94 61.88T Pano PWAT-182-LT-2X... Panorama Dual Antenna Solution for IBR 1700 w/ 2nd Modem - BLACK

1.00 1,031.55 1,031.55T
Cradle MAA5-1700120... Cradlepoint IBR 1700 Advanced Modem Bundle with 5 year Netcloud

1.00 3,851.85 3,851.85T
Cradle MA-MC400-120... Cradlepoint Cradlepoint MC400-1200M - wireless cellular modem - 4G LTE Advanced Pro

1.00 837.56 837.56T

1.00 Sha UL626SM825BK-1F Shaxon Cat5E shielded patch cord 25FT Black 11.88 11.88T PCT KE794 PC Tel Motorola Style, Permanent Hole Thick Surface Mounts - 3/8" or 3/4", 30 ft cable

4.00 45.165 180.66T
PCT MWB-1320 PC Wide band quarterwave antenna with shock spring.

Bandwidth- 24 MHz VHF/ 100 MHz UHF.

1.00 33.11 33.11T

1.00 Laird QW800 806-896 MHz Unity 1/4 Quarter Wave Antenna 8.53 8.53T

2.00 Lar NMOCAPB Pulse Larsen - Rain Cap NMO, Black 6.44 12.88T

Page 1 ends
Page 264 ends

Quote
Date
6/17/2024
Quote #
5661
Bill To:

City of Fountain Valley
10200 Slater Avenue
Fountain Valley CA 92708
Ship To:

City of Fountain Valley Fire
Department
17737 Bushard Street
Fountain Valley, CA 92708
P.O. No. Terms
Net 30
Rep
GJ
FOB
Perris, Ca
Project Make / Model / Year
2027 Type 1
Signature Total
Subtotal
test Sales Tax (8.0%)
7 Qty Item Description Each Total

1.00 RF RFU-600-6 RF Industries Mini UHF Connector RG58 5.36 5.36T

1.00 RF RQA-5411 RF Industries QMA Male To Mini Uhf Female Adapter 31.52 31.52T RF RFN-1005-3C RF Industries Connector, N-Male Crimp for LMR195, RG58, Silver Plated

1.00 10.42 10.42T
BK KNG-M150LPR Bendix King Mobile,Digital, TrunkMnt,VHF136-174MHz, 5000Ch,50W/1W, Integrated GPS

1.00 1,903.44 1,903.44T
BK KAA0660 BK Technologies Remote Control Head M-XXX (includes KAA0638 remote head install kit)

1.00 922.68 922.68T

1.00 BK KAA0637 BK Technologies Cable Assy Remote Mount 25' KNG-M 129.84 129.84T BK KAA0290S BK Technologies Handheld Programming Microphone, straight connector

1.00 241.56 241.56T

1.00 Mot HKN6167B Motorola 50 foot control cable 147.44 147.44T

1.00 Mot HKN6168 Motorola 30 foot control Cable 111.26 111.26T

2.00 Mot HKN6188A Control Head / Ignition Sense Power Cable 54.625 109.25T

1.00 Mot HKN4192B Motorola High Power cable, 20 ft 43.50 43.50T

1.00 Mot HKN6186A Motorola Mount Remote Head Trunnion 39.31 39.31T

1.00 Mot HLN6861 Motorola Standard trunnion Kit 67.73 67.73T

1.00 Mot HLN6863A Motorola Accessory Connector, XTL 5000 41.23 41.23T

3.00 MM MMSU-1 Magnetic Mic microphone clip 32.50 97.50T

1.00 GJ DS-56 Horizontal Surface Base 46.58 46.58T

1.00 GJ 7160-0831 Gamber Johnson Independent Tall Tablet-Display Mount 72.23 72.23T GJ 7170-0695-00 Gamber Johnson Getac A140 Tablet Docking Station with 120W Auto Power Adapter, No RF

1.00 921.10 921.10T

1.00 Lind ASMTL-00332 Bracket for Mounting Lind Rugged Adapters in Vehicles 13.00 13.00T

1.00 Misc parts Misc battery cable, wire, fuses and hardware 500.00 500.00T Labor Installation Labor to install customer supplied Motorola 800 Mhz radio

0.00 0.00 0.00
Labor Installation Labor install customer supplied Motorola radio chargers

0.00 0.00 0.00

Page 2 ends
Page 265 ends

Quote
Date
6/17/2024
Quote #
5661
Bill To:

City of Fountain Valley
10200 Slater Avenue
Fountain Valley CA 92708
Ship To:

City of Fountain Valley Fire
Department
17737 Bushard Street
Fountain Valley, CA 92708
P.O. No. Terms
Net 30
Rep
GJ
FOB
Perris, Ca
Project Make / Model / Year
2027 Type 1
Signature Total
Subtotal
test Sales Tax (8.0%)
7 Qty Item Description Each Total

0.00 Labor Installation of customer supplied TIC Charger 0.00 0.00

0.00 Labor remote mount siren PA Microphone 0.00 0.00

1.00 Labor Installation Labor 11,000.00 11,000.00

1.00 Labor Installl customer supplied GPS Emitter 1,000.00 1,000.00

1.00 GTT GPS GTT GPS Emitter System 4,226.25 4,226.25T

Page 3 ends

_____________________________________ $32,528.39
$31,007.77
$1,520.62

Page 266 ends

Proposal for Fountain Valley
Prepared by South Coast Fire Equipment, Inc
12/11/2023

Page 267 ends

As Proposed 1 of 131 12-11-23

CONTENTS
GENERAL DESIGN AND CONSTRUCTION.....................................................................................17 QUALITY AND WORKMANSHIP...................................................................................................17 DELIVERY .................................................................................................................................18 MANUAL AND SERVICE INFORMATION .......................................................................................18 SAFETY VIDEO..........................................................................................................................18 PERFORMANCE TESTS...............................................................................................................18 SERVICE AND WARRANTY SUPPORT ..........................................................................................19 LIABILITY .................................................................................................................................19 INSURANCE PROVIDED BY BIDDER ............................................................................................19 COMMERCIAL GENERAL LIABILITY INSURANCE ..........................................................................19 COMMERCIAL AUTOMOBILE LIABILITY INSURANCE ....................................................................20 UMBRELLA/EXCESS LIABILITY INSURANCE .................................................................................20 INSURANCE PROVIDED BY MANUFACTURER...............................................................................20 PRODUCT LIABILITY INSURANCE...............................................................................................20 UMBRELLA/EXCESS LIABILITY INSURANCE .................................................................................21 SINGLE SOURCE MANUFACTURER..............................................................................................21 NFPA 2016 STANDARDS ............................................................................................................22 NFPA COMPLIANCY ...................................................................................................................22 PUMP TEST...............................................................................................................................22 GENERATOR TEST.....................................................................................................................22 BREATHING AIR TEST ...............................................................................................................22 VEHICLE INSPECTION PROGRAM CERTIFICATION.......................................................................22 BID BOND NOT REQUESTED......................................................................................................23 PERFORMANCE BOND NOT REQUESTED.....................................................................................23 APPROVAL DRAWING ................................................................................................................24 FINAL DRAWING .......................................................................................................................24 DRAWING, COMPARTMENT LAYOUT...........................................................................................24 ELECTRICAL WIRING DIAGRAMS................................................................................................24 ENFORCER CHASSIS..................................................................................................................24 ANGLE OF DEPARTURE..............................................................................................................25 ANGLE OF APPROACH................................................................................................................25

Page 268 ends

As Proposed 2 of 131 12-11-23
WHEELBASE..............................................................................................................................25 GVW RATING............................................................................................................................25 FRAME......................................................................................................................................25 FRAME REINFORCEMENT...........................................................................................................25 FRONT NON DRIVE AXLE...........................................................................................................25 FRONT SUSPENSION .................................................................................................................26 FRONT SHOCK ABSORBERS .......................................................................................................26 FRONT OIL SEALS .....................................................................................................................26 FRONT TIRES............................................................................................................................27 REAR AXLE ...............................................................................................................................27 TOP SPEED OF VEHICLE ............................................................................................................27 REAR SUSPENSION ...................................................................................................................27 REAR OIL SEALS .......................................................................................................................27 MODIFICATION.........................................................................................................................27 REAR TIRES..............................................................................................................................27 TIRE BALANCE ..........................................................................................................................27 TIRE PRESSURE MANAGEMENT..................................................................................................28 FRONT HUB COVERS .................................................................................................................28 REAR HUB COVERS ...................................................................................................................28 MUD FLAPS...............................................................................................................................28 WHEEL CHOCKS PROVIDED BY FIRE DEPARTMENT.....................................................................28 Wheel Chock Brackets Provided by Fire Department .................................................................28 ANTI-LOCK BRAKE SYSTEM........................................................................................................28 BRAKES ....................................................................................................................................28 BRAKE SYSTEM AIR COMPRESSOR .............................................................................................29 BRAKE SYSTEM .........................................................................................................................29 BRAKE SYSTEM AIR DRYER........................................................................................................29 BRAKE LINES ............................................................................................................................29 AIR INLET.................................................................................................................................29 RECESSED BOX FOR AIR FITTING ..............................................................................................30 ENGINE ....................................................................................................................................30 HIGH IDLE................................................................................................................................30

Page 269 ends

As Proposed 3 of 131 12-11-23
ENGINE BRAKE .........................................................................................................................30 CLUTCH FAN.............................................................................................................................31 ENGINE AIR INTAKE..................................................................................................................31 EXHAUST SYSTEM.....................................................................................................................31 EXHAUST MODIFICATION..........................................................................................................31 RADIATOR................................................................................................................................31 COOLANT LINES........................................................................................................................32 FUEL TANK ...............................................................................................................................32 DIESEL EXHAUST FLUID TANK ...................................................................................................33 FUEL PRIMING PUMP.................................................................................................................33 FUEL COOLER ...........................................................................................................................33 TRANSMISSION.........................................................................................................................33 TRANSMISSION SHIFTER...........................................................................................................33 TRANSMISSION PROGRAMMING ................................................................................................34 TRANSMISSION COOLER ...........................................................................................................34 DRIVELINE................................................................................................................................34 STEERING.................................................................................................................................34 STEERING WHEEL .....................................................................................................................34 LOGO AND CUSTOMER DESIGNATION ON HORN BUTTON...........................................................34 BUMPER ...................................................................................................................................35 Gravel Pan.............................................................................................................................35 CENTER HOSE TRAY..................................................................................................................35 RIGHT SIDE HOSE TRAY............................................................................................................35 LIFT AND TOW MOUNTS ...........................................................................................................35 TOW HOOKS.............................................................................................................................35 DROP DOWN BUMPER SECTION WITH COVER ............................................................................35 TRAY COVER.............................................................................................................................36 FRONT BUMPER UL-LX COATING................................................................................................36 CAB..........................................................................................................................................36 CAB ROOF DRIP RAIL ................................................................................................................37 CAB PUMP ENCLOSURE..............................................................................................................37 FENDER LINERS........................................................................................................................37

Page 270 ends

As Proposed 4 of 131 12-11-23
PANORAMIC WINDSHIELD.........................................................................................................37 WINDSHIELD WIPERS ...............................................................................................................38 ENGINE TUNNEL .......................................................................................................................38 CAB REAR WALL EXTERIOR COVERING.......................................................................................38 CAB LIFT ..................................................................................................................................38 Cab Lift Interlock ...................................................................................................................39 GRILLE .....................................................................................................................................39 SCUFFPLATE .............................................................................................................................39 DOOR JAMB SCUFFPLATES ........................................................................................................39 MIRRORS..................................................................................................................................39 DOORS.....................................................................................................................................39 Door Panels ...........................................................................................................................40 ELECTRIC OPERATED CAB DOOR WINDOWS ..............................................................................40 ELECTRIC CAB DOOR LOCKS......................................................................................................40 KEY PAD FOR ELECTRIC DOOR LOCKS........................................................................................40 CAB STEPS................................................................................................................................40 CAB EXTERIOR HANDRAILS .......................................................................................................41 STEP LIGHTS ............................................................................................................................41 FENDER CROWNS .....................................................................................................................41 CREW CAB WINDOWS ...............................................................................................................41 RIGHT SIDE ROLLUP CREW CAB DOOR WINDOW TINT ...............................................................41 BEHIND LEFT SIDE CAB DOOR WINDOW TINT ...........................................................................41 BEHIND RIGHT SIDE CAB DOOR WINDOW TINT.........................................................................41 LEFT SIDE ROLLUP CREW CAB DOOR WINDOW TINT..................................................................42 LEFT SIDE UPPER CREW CAB DOOR WINDOW TINT....................................................................42 RIGHT SIDE UPPER CREW CAB DOOR WINDOW TINT .................................................................42 CAB DASH.................................................................................................................................42 BRACKET TO MOUNT SCBA HOLDER ..........................................................................................42 EQUIPMENT MOUNTING TRAY(S)...............................................................................................42 MOUNTING SYSTEM ..................................................................................................................42 MOUNTING PLATE ON ENGINE TUNNEL......................................................................................42 CAB INTERIOR..........................................................................................................................43

Page 271 ends

As Proposed 5 of 131 12-11-23
CAB INTERIOR UPHOLSTERY .....................................................................................................43 CAB INTERIOR PAINT................................................................................................................43 CAB FLOOR...............................................................................................................................43 DEFROST/AIR CONDITIONING SYSTEM......................................................................................44 Cab Defroster ........................................................................................................................44 Cab/Crew Auxiliary Heater ......................................................................................................44 Air Conditioning .....................................................................................................................44 Climate Control ......................................................................................................................45 Gravity Drain Tubes................................................................................................................45 SUN VISORS .............................................................................................................................45 GRAB HANDLES.........................................................................................................................45 ENGINE COMPARTMENT LIGHTS................................................................................................45 ACCESS TO ENGINE DIPSTICKS .................................................................................................46 VELCRO STRAP(S) FOR MAP BOX ...............................................................................................46 MAP BOX ..................................................................................................................................46 SEATING CAPACITY...................................................................................................................46 DRIVER SEAT............................................................................................................................46 OFFICER SEAT ..........................................................................................................................46 REAR FACING DRIVER SIDE OUTBOARD SEAT ............................................................................46 REAR FACING PASSENGER SIDE OUTBOARD SEAT......................................................................47 FORWARD FACING CENTER SEATS.............................................................................................47 SEAT UPHOLSTERY ...................................................................................................................47 AIR BOTTLE HOLDERS...............................................................................................................47 FOOT REST ANGLE....................................................................................................................47 ACCESS DOOR ..........................................................................................................................47 SEAT BELTS..............................................................................................................................47 HELMET STORAGE PROVIDED BY FIRE DEPARTMENT..................................................................48 CAB DOME LIGHTS....................................................................................................................48 ENHANCED SOFTWARE FOR CAB AND CREW CAB DOME LIGHTS.................................................48 PORTABLE HAND LIGHTS, PROVIDED BY FIRE DEPARTMENT ......................................................48 CAB INSTRUMENTATION ...........................................................................................................48 Gauges..................................................................................................................................49

Page 272 ends

As Proposed 6 of 131 12-11-23
Indicator Lamps.....................................................................................................................50 Alarms...................................................................................................................................51 Indicator Lamp and Alarm Prove-Out.......................................................................................51 Control Switches ....................................................................................................................51 Custom Switch Panels.............................................................................................................52 Diagnostic Panel.....................................................................................................................53 Cab LCD Display.....................................................................................................................53 AIR RESTRICTION INDICATOR...................................................................................................53 "DO NOT MOVE APPARATUS" INDICATOR ..................................................................................53 DO NOT MOVE TRUCK MESSAGES..............................................................................................54 SWITCH PANELS .......................................................................................................................54 WIPER CONTROL ......................................................................................................................55 SPARE CIRCUIT.........................................................................................................................55 SPARE CIRCUIT.........................................................................................................................55 RADIO, AM/FM/WB/USB/BT .......................................................................................................56 INFORMATION CENTER .............................................................................................................56 General Screen Design ...........................................................................................................56 Home/Transit Screen..............................................................................................................57 On Scene Screen....................................................................................................................57 Virtual Buttons.......................................................................................................................57 Page Screen ..........................................................................................................................58 VEHICLE DATA RECORDER ........................................................................................................60 Seat Belt Monitoring System ...................................................................................................60 HEADSET HANGERS ..................................................................................................................61 VEHICLE CAMERA SYSTEM.........................................................................................................61 RECESS REAR CAMERA..............................................................................................................61 ELECTRICAL POWER CONTROL SYSTEM .....................................................................................61 Solid-State Control System......................................................................................................62 Circuit Protection and Control Diagram ....................................................................................63 On-Board Electrical System Diagnostics ...................................................................................63 TCU Module with WiFi ............................................................................................................63 Indicator Light and Alarm Prove-Out System ............................................................................63

Page 273 ends

As Proposed 7 of 131 12-11-23
Voltage Monitor System..........................................................................................................64 Dedicated Radio Equipment Connection Points .........................................................................64 EMI/RFI Protection.................................................................................................................64 ELECTRICAL SYSTEM PROGNOSTICS..........................................................................................64 TELEMATICS SYSTEM ................................................................................................................65 ELECTRICAL..............................................................................................................................65 BATTERY SYSTEM .....................................................................................................................66 ISOLATED BATTERY ..................................................................................................................67 BATTERY SYSTEM .....................................................................................................................67 MASTER BATTERY SWITCH........................................................................................................67 BATTERY COMPARTMENTS ........................................................................................................67 JUMPER STUDS.........................................................................................................................67 BATTERY CHARGER...................................................................................................................67 KUSSMAUL AUTO EJECT FOR SHORELINE...................................................................................68 ALTERNATOR............................................................................................................................68 ELECTRONIC LOAD MANAGER....................................................................................................68 SEQUENCER..............................................................................................................................69 HEADLIGHTS ............................................................................................................................70 DIRECTIONAL LIGHTS...............................................................................................................70 INTERMEDIATE LIGHT...............................................................................................................70 CAB CLEARANCE/MARKER/ID LIGHTS.........................................................................................70 FRONT CAB SIDE DIRECTIONAL/MARKER LIGHTS.......................................................................70 REAR CLEARANCE/MARKER/ID LIGHTING...................................................................................70 REAR FMVSS LIGHTING.............................................................................................................71 LICENSE PLATE BRACKET ..........................................................................................................72 BACK-UP ALARM........................................................................................................................72 WARNING LIGHT FLASH PATTERN .............................................................................................72 CAB PERIMETER SCENE LIGHTS.................................................................................................72 PUMP HOUSE PERIMETER LIGHTS..............................................................................................72 BODY PERIMETER SCENE LIGHTS ..............................................................................................72 ADDITIONAL PERIMETER LIGHTS ..............................................................................................72 ENHANCED SOFTWARE FOR PERIMETER LIGHTS ........................................................................73

Page 274 ends

As Proposed 8 of 131 12-11-23
STEP LIGHTS ............................................................................................................................73 12 VOLT LIGHTING ...................................................................................................................73 12 VOLT LIGHTING ...................................................................................................................73 12 VOLT LIGHTING ...................................................................................................................74 12 VOLT LIGHTING ...................................................................................................................74 12 VOLT LIGHTING ...................................................................................................................74 12 VOLT LIGHTING ...................................................................................................................74 HOSE BED LIGHTS ....................................................................................................................75 WALKING SURFACE LIGHT.........................................................................................................75 MASTER SWITCH FOR 12 VOLT LIGHTS......................................................................................75 WATER TANK............................................................................................................................75 SLEEVE, PLUMBING, THROUGH TANK.........................................................................................76 BODY HEIGHT...........................................................................................................................76 HOSE BED ................................................................................................................................76 HOSE BED DIVIDER...................................................................................................................77 HOSE BED COVER .....................................................................................................................77 HOSEBED END FLAP..................................................................................................................77 RUNNING BOARDS ....................................................................................................................78 TAILBOARD ..............................................................................................................................78 REAR WALL, BODY MATERIAL, PUC............................................................................................78 COMPARTMENTATION...............................................................................................................78 UNDERBODY SUPPORT SYSTEM.................................................................................................79 AGGRESSIVE WALKING SURFACE...............................................................................................80 LOUVERS..................................................................................................................................80 TESTING OF BODY DESIGN .......................................................................................................80 LEFT SIDE COMPARTMENTATION...............................................................................................80 RIGHT SIDE COMPARTMENTATION ............................................................................................81 SIDE COMPARTMENT ROLLUP DOOR(S) .....................................................................................82 REAR COMPARTMENTATION......................................................................................................82 ROLLUP REAR COMPARTMENT DOOR.........................................................................................83 SCUFFPLATE .............................................................................................................................84 SCUFFPLATE .............................................................................................................................84

Page 275 ends

As Proposed 9 of 131 12-11-23
KEYED LOCK(S).........................................................................................................................84 ELECTRIC DOOR LOCKS ............................................................................................................84 ROLLUP DOOR PULL STRAPS .....................................................................................................84 ROLL-UP DOOR TRIM ................................................................................................................84 COMPARTMENT LIGHTING.........................................................................................................84 HATCH COMPARTMENTS ...........................................................................................................85 HATCH COMPARTMENT LIGHTING .............................................................................................85 MOUNTING TRACKS ..................................................................................................................85 ADJUSTABLE SHELVES...............................................................................................................85 SLIDE-OUT ADJUSTABLE HEIGHT TRAY......................................................................................86 SLIDE-OUT FLOOR MOUNTED TRAY ...........................................................................................86 DRAWER INSERT ......................................................................................................................87 DRAWER ASSEMBLY ..................................................................................................................87 SWING OUT TOOLBOARD ..........................................................................................................87 PARTITION, TRANSVERSE REAR COMPARTMENT ........................................................................88 VERTICAL COMPARTMENT PARTITION .......................................................................................88 MATTING, COMPARTMENT FLOOR .............................................................................................88 MATTING, COMPARTMENT TRAYS AND SHELVES ........................................................................88 PEGBOARD ...............................................................................................................................88 STRAP ......................................................................................................................................89 RUB RAIL..................................................................................................................................89 BODY FENDER CROWNS............................................................................................................89 HARD SUCTION HOSE ...............................................................................................................89 HANDRAILS ..............................................................................................................................89 HANDRAIL ................................................................................................................................89 EXTINGUISHER/AIR BOTTLE/ STORAGE (Triangular) ...................................................................90 AIR BOTTLE COMPARTMENT STRAP...........................................................................................90 EXTINGUISHER STORAGE INSERT..............................................................................................90 AIR BOTTLE STORAGE (Triple)...................................................................................................90 AIR BOTTLE COMPARTMENT STRAP...........................................................................................90 AIR BOTTLE STORAGE (Single) ..................................................................................................90 AIR BOTTLE COMPARTMENT STRAP...........................................................................................90

Page 276 ends

As Proposed 10 of 131 12-11-23
AIR BOTTLE HOLDERS...............................................................................................................91 EXTENSION LADDER .................................................................................................................91 ROOF LADDER ..........................................................................................................................91 LADDER STORAGE.....................................................................................................................91 FOLDING LADDER .....................................................................................................................91 FOLDING LADDER/LONG TOOL COMPARTMENT ..........................................................................91 10' PIKE POLE...........................................................................................................................91 PIKE POLE 8 FT.........................................................................................................................91 PIKE POLE STORAGE .................................................................................................................92 6' PIKE POLE.............................................................................................................................92 TRASH HOOK STORAGE.............................................................................................................92 PIKE POLE STORAGE .................................................................................................................92 LADDER, TOP ACCESS ...............................................................................................................92 I-ZONE BRACKETS.....................................................................................................................92 PUMP CONTROL PANELS (Left Side Control)................................................................................92 CARGO AREA FLOOR LOWERED .................................................................................................93 CARGO AREA COMPARTMENT ....................................................................................................93 PUMP .......................................................................................................................................94 PUMP MOUNTING......................................................................................................................95 MECHANICAL SEALS..................................................................................................................95 PUMP GEAR CASE......................................................................................................................95 CLUTCH....................................................................................................................................95 LOW PRESSURE/HIGH TEMPERATURE LIGHTS............................................................................95 PUMPING MODE........................................................................................................................95 PUMP SHIFT .............................................................................................................................96 TRANSMISSION LOCK UP...........................................................................................................96 AUXILIARY COOLING SYSTEM....................................................................................................96 INTAKE RELIEF VALVE - PUMP ...................................................................................................96 PRIMING PUMP .........................................................................................................................98 THERMAL RELIEF VALVE............................................................................................................98 PUMP MANUALS ........................................................................................................................99 PLUMBING, STAINLESS STEEL AND HOSE...................................................................................99

Page 277 ends

As Proposed 11 of 131 12-11-23
FOAM SYSTEM PLUMBING .........................................................................................................99 MAIN PUMP INLETS...................................................................................................................99 SHORT SUCTION TUBE(S) .........................................................................................................99 INLET VALVES WITH INTAKE RELIEF VALVE ...............................................................................99 MAIN PUMP INLET CAP............................................................................................................100 VALVES...................................................................................................................................100 INLET CONTROL......................................................................................................................100 LEFT SIDE INLET.....................................................................................................................100 RIGHT SIDE INLET ..................................................................................................................101 ANODE, INLET ........................................................................................................................101 FRONT INLET..........................................................................................................................101 FRONT INLET CONTROL ..........................................................................................................101 FRONT INLET INTAKE RELIEF VALVE........................................................................................101 FRONT INLET PIPING ..............................................................................................................101 FRONT INLET CAP ...................................................................................................................102 INLET BLEEDER VALVE ............................................................................................................102 TANK TO PUMP .......................................................................................................................102 TANK REFILL...........................................................................................................................102 DISCHARGE OUTLET CONTROLS ..............................................................................................102 LEFT SIDE DISCHARGE OUTLETS .............................................................................................103 LEFT SIDE OUTLET ELBOWS ....................................................................................................103 RIGHT SIDE DISCHARGE OUTLETS...........................................................................................103 RIGHT SIDE OUTLET ELBOWS..................................................................................................103 LARGE DIAMETER DISCHARGE OUTLET....................................................................................103 LARGE DIAMETER OUTLET CAP................................................................................................104 FRONT DISCHARGE OUTLET ....................................................................................................104 REAR DISCHARGE OUTLET.......................................................................................................104 REAR OUTLET ELBOWS............................................................................................................104 HOSE BED DISCHARGE OUTLET ...............................................................................................104 HOSE BED DISCHARGE OUTLET ...............................................................................................104 DISCHARGE CAPS/ INLET PLUGS..............................................................................................105 OUTLET BLEEDER VALVE .........................................................................................................105

Page 278 ends

As Proposed 12 of 131 12-11-23
DELUGE RISER........................................................................................................................105 TELESCOPIC PIPING................................................................................................................105 MONITOR ...............................................................................................................................106 NOZZLE, DELUGE ....................................................................................................................106 CROSSLAY MODULE.................................................................................................................106 ROLLUP DOOR, CROSSLAY ENDS..............................................................................................106 CROSSLAY COMPARTMENT LIGHTING ......................................................................................107 CROSSLAY(S), LOWER .............................................................................................................107

1.50" Crosslays ....................................................................................................................107 Crosslay Hose Trays .............................................................................................................107 UPPER DEADLAY HOSE BED .....................................................................................................107 Crosslay Hose Trays .............................................................................................................107 PIKE POLE STORAGE ...............................................................................................................108 PIKE POLE STORAGE ...............................................................................................................108 LONG TOOL STORAGE .............................................................................................................108 BOOSTER HOSE REEL..............................................................................................................108 PRESSURE GAUGE ...................................................................................................................108 FOAM SYSTEM ........................................................................................................................109 FOAM TANK ............................................................................................................................110 FOAM TANK DRAIN..................................................................................................................110 PUMP PANEL CONFIGURATION ................................................................................................110 PUMP AND GAUGE PANEL ........................................................................................................110 PUMP AND PLUMBING ACCESS.................................................................................................110 PUMP COMPARTMENT LIGHT ...................................................................................................110 THROTTLE READY GREEN INDICATOR LIGHT ...........................................................................111 AIR HORN SWITCH..................................................................................................................111 VACUUM AND PRESSURE GAUGES............................................................................................111 PRESSURE GAUGES .................................................................................................................111 WATER LEVEL GAUGE..............................................................................................................111 ADDITIONAL WATER LEVEL GAUGE..........................................................................................112 FOAM LEVEL GAUGE................................................................................................................112 SIDE CONTROL PUMP OPERATOR'S/PUMP PANEL LIGHTING......................................................112

Page 279 ends

As Proposed 13 of 131 12-11-23
AIR HORN SYSTEM..................................................................................................................113 Air Horn Location .................................................................................................................113 Air Horn Control ...................................................................................................................113 ELECTRONIC SIREN.................................................................................................................113 SIREN CONTROL .....................................................................................................................113 SPEAKER.................................................................................................................................113 AUXILIARY MECHANICAL SIREN...............................................................................................113 MECHANICAL SIREN CONTROL.................................................................................................114 FRONT ZONE UPPER WARNING LIGHTS....................................................................................114 FRONT ZONE LOWER LIGHTS ..................................................................................................115 DAYTIME RUNNING LIGHTS (HEADLIGHTS)..............................................................................115 HEADLIGHT FLASHER ..............................................................................................................116 SIDE ZONE LOWER LIGHTING..................................................................................................116 INTERIOR CAB DOOR WARNING LIGHTS ..................................................................................116 ELECTRICAL CONNECTORS FOR WARNING LIGHTS...................................................................116 SIDE WARNING LIGHTS...........................................................................................................117 SIDE WARNING LIGHTS...........................................................................................................117 REAR ZONE LOWER LIGHTING.................................................................................................117 WARNING LIGHTS (Rear and Side upper zones) ........................................................................117 TRAFFIC DIRECTING LIGHT .....................................................................................................118 120 VOLT RECEPTACLE............................................................................................................118 LOOSE EQUIPMENT.................................................................................................................118 NFPA REQUIRED LOOSE EQUIPMENT PROVIDED BY FIRE DEPARTMENT ....................................118 SOFT SUCTION HOSE ..............................................................................................................120 DRY CHEMICAL EXTINGUISHER PROVIDED BY FIRE DEPARTMENT.............................................120 WATER EXTINGUISHER PROVIDED BY FIRE DEPARTMENT ........................................................120 FLATHEAD AXE PROVIDED BY FIRE DEPARTMENT.....................................................................120 PICKHEAD AXE PROVIDED BY FIRE DEPARTMENT.....................................................................120 PAINT PROCESS ......................................................................................................................120 Environmental Impact...........................................................................................................121 CAB PAINT..............................................................................................................................122 BODY PAINT ...........................................................................................................................122

Page 280 ends

As Proposed 14 of 131 12-11-23
PAINT CHASSIS FRAME ASSEMBLY ...........................................................................................122 AXLE HUB PAINT .....................................................................................................................123 COMPARTMENT INTERIOR PAINT.............................................................................................123 REFLECTIVE STRIPES ..............................................................................................................123 REAR CHEVRON STRIPING.......................................................................................................123 FOLDED RIBBON IN REFLECTIVE STRIPE..................................................................................123 CAB DOOR REFLECTIVE STRIPE ...............................................................................................123 LETTERING .............................................................................................................................123 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 LETTERING .............................................................................................................................124 EMBLEM..................................................................................................................................124 MALTESE CROSS INSTALLATION ..............................................................................................124 LETTERING/NUMERALS ON CAB GRILLE ...................................................................................125 FIRE APPARATUS PARTS MANUAL ............................................................................................125 Service Parts Internet Site.....................................................................................................125 CHASSIS SERVICE MANUALS....................................................................................................125 CHASSIS OPERATION MANUAL.................................................................................................126 ONE (1) YEAR MATERIAL AND WORKMANSHIP..........................................................................126 ENGINE WARRANTY ................................................................................................................126 STEERING GEAR WARRANTY....................................................................................................126 FIFTY (50) YEAR STRUCTURAL INTEGRITY ...............................................................................126 FRONT AXLE THREE (3) YEAR MATERIAL AND WORKMANSHIP WARRANTY ................................126 SINGLE REAR AXLE FIVE (5) YEAR MATERIAL AND WORKMANSHIP WARRANTY..........................126 ABS BRAKE SYSTEM THREE (3) YEAR MATERIAL AND WORKMANSHIP WARRANTY .....................126 TEN (10) YEAR STRUCTURAL INTEGRITY..................................................................................126

Page 281 ends

As Proposed 15 of 131 12-11-23
TEN (10) YEAR PRO-RATED PAINT AND CORROSION ................................................................126 FIVE (5) YEAR MATERIAL AND WORKMANSHIP .........................................................................126 CAMERA SYSTEM WARRANTY...................................................................................................126 COMPARTMENT LIGHT WARRANTY ..........................................................................................127 TRANSMISSION WARRANTY.....................................................................................................127 TRANSMISSION COOLER WARRANTY .......................................................................................127 WATER TANK WARRANTY........................................................................................................127 TEN (10) YEAR STRUCTURAL INTEGRITY..................................................................................127 ROLL UP DOOR MATERIAL AND WORKMANSHIP WARRANTY .....................................................127 SEVEN (7) YEAR PARTS, ONE (1) YEAR LABOR..........................................................................127 TEN (10) YEAR PUMP PLUMBING WARRANTY............................................................................127 TEN (10) YEAR PRO-RATED PAINT AND CORROSION ................................................................127 THREE (3) YEAR MATERIAL AND WORKMANSHIP......................................................................128 VEHICLE STABILITY CERTIFICATION........................................................................................128 ENGINE INSTALLATION CERTIFICATION...................................................................................128 POWER STEERING CERTIFICATION ..........................................................................................128 CAB INTEGRITY CERTIFICATION..............................................................................................128 Side Impact .........................................................................................................................128 Frontal Impact .....................................................................................................................128 Additional Frontal Impact......................................................................................................128 Roof Crush...........................................................................................................................129 Additional Roof Crush ...........................................................................................................129 CAB DOOR DURABILITY CERTIFICATION ..................................................................................129 WINDSHIELD WIPER DURABILITY CERTIFICATION ...................................................................129 ELECTRIC WINDOW DURABILITY CERTIFICATION ....................................................................129 SEAT BELT ANCHOR STRENGTH...............................................................................................129 SEAT MOUNTING STRENGTH ...................................................................................................129 PERFORMANCE CERTIFICATIONS .............................................................................................130 Cab Air Conditioning .............................................................................................................130 Cab Defroster.......................................................................................................................130 Cab Auxiliary Heater .............................................................................................................130 AMP DRAW REPORT ................................................................................................................130

Page 282 ends

As Proposed 16 of 131 12-11-23

Page 283 ends

As Proposed 17 of 131 12-11-23
South Coast Fire Equipment is pleased to submit a proposal to Fountain Valley Fire Department for a Pierce® multi purpose response vehicle per your request for quotation. The following paragraphs will describe in detail the apparatus, construction methods, and equipment proposed. This proposal will indicate size, type, model and make of components parts and equipment, providing proof of compliance with each and every item (except where noted) in the departments advertised specifications.

PIERCE MANUFACTURING was founded in 1913. Since then we have been building bodies with one philosophy, "BUILD THE FINEST". Our skilled craftsmen take pride in their work, which is reflected, in the final product. We have been building fire apparatus since the early "forties" giving Pierce Manufacturing over 75 years of experience in the fire apparatus market. Pierce Manufacturing has built and put into service more than 62,500 apparatus, including more than 33,900 on Pierce custom chassis designed and built specifically for fire and emergency applications. Our Appleton, Wisconsin facility has over 870,000 total square feet of floor space situated on approximately 105 acres of land. Our Bradenton, Florida facility has 300,000 square feet of floor space situated on approximately 38 acres of land.

Our beliefs in high ethical standards are carried through in all of our commitments and to everyone with whom we do business. Honesty, Integrity, Accountability and Citizenship are global tenets by which we all live and work. Consequently, we neither engage in, nor have we ever been convicted of price fixing, bid rigging, or collusion in any domestic or international fire apparatus market.

Pierce has only one brand of fire apparatus "Pierce", ensuring you are receiving top of the line product that meets your specification.

In accordance with the current edition of applicable NFPA standards, this proposal will specify whether the fire department, manufacturer, or apparatus dealership will provide required loose equipment.

Images and illustrative material in this proposal are as accurate as known at the time of publication, but are subject to change without notice. Images and illustrative material is for reference only, and may include optional equipment and accessories and may not include all standard equipment.

GENERAL DESIGN AND CONSTRUCTION
To control quality, ensure compatibility, and provide a single source for service and warranty, the custom cab, chassis, pump module and body will be entirely designed, assembled/welded and painted in Pierce owned manufacturing facilities. This includes, but not limited to the cab weldment, the pumphouse module assembly, the chassis assembly, the body and the electrical system.

QUALITY AND WORKMANSHIP
Pierce has set the pace for quality and workmanship in the fire apparatus field. Our tradition of building the highest quality units with craftsmen second to none has been the rule right from the beginning and we demonstrate that ongoing commitment by: Ensuring all steel welding follows American Welding Society D1.1-2004 recommendations for structural steel welding. All aluminum welding follows American Welding society and ANSI D1.2-2003 requirements for structural welding of

Page 284 ends

As Proposed 18 of 131 12-11-23
aluminum. All sheet metal welding follows American welding Society B2.1-2000 requirements for structural welding of sheet metal. Our flux core arc welding uses alloy rods, type 7000 and is performed to American Welding Society standards A5.20-E70T1. Furthermore, all employees classified as welders are tested and certified to meet the American welding Society codes upon hire and every three (3) years thereafter. Pierce also employs and American Welding Society certified welding inspector in plant during working hours to monitor weld quality.

Pierce Manufacturing operates a Quality Management System under the requirements of ISO 9001.

These standards sponsored by the International Organization for Standardization (ISO) specify the quality systems that are established by the manufacturer for design, manufacture, installation and service. A copy of the certificate of compliance is included with this proposal.

In addition to the Quality Management system, we also employ a Quality Achievement Supplier program to insure the vendors and suppliers that we utilize meet the high standards we demand. That is just part of our overall "Quality at the Source" program at Pierce.

To demonstrate the quality of our products and services, a list of at least twenty five (25) fire departments/municipalities that have purchased vehicles for a second time is provided.

DELIVERY
The apparatus will be delivered under its own power to insure proper break-in of all components while the apparatus is still under warranty. A qualified delivery representative shall deliver the apparatus and remain for a sufficient length of time to instruct personnel in proper operation, care and maintenance of the equipment delivered.

MANUAL AND SERVICE INFORMATION
At time of delivery, complete operation and maintenance manuals covering the apparatus will be provided. A permanent plate will be mounted in the driver's compartment specifying the quantity and type of fluids required including engine oil, engine coolant, transmission, pump transmission lubrication, pump primer and drive axle.

SAFETY VIDEO
At the time of delivery Pierce will also provide one (1) 39-minute, professionally produced apparatus safety video, in DVD format. This video will address key safety considerations for personnel to follow when they are driving, operating, and maintaining the apparatus, including the following: vehicle pretrip inspection, chassis operation, pump operation, aerial operation, and safety during maintenance.

PERFORMANCE TESTS
A road test will be conducted with the apparatus fully loaded and a continuous run of no less than ten (10) miles. During that time the apparatus will show no loss of power nor will it overheat. The transmission drive shaft or shafts and the axles will run quietly and be free of abnormal vibration or noise. The apparatus when fully loaded will not have less than 25 percent nor more than 50 percent on the front axle, and not less than 50 percent nor more than 75 percent on the rear axle. The

Page 285 ends

As Proposed 19 of 131 12-11-23
apparatus will meet the current edition of applicable NFPA standards acceleration and braking requirements.

SERVICE AND WARRANTY SUPPORT
Pierce dealership support will be provided by South Coast Emergency Equipment by operating in conjunction with a Pierce authorized service center. The service center will have factory-trained mechanics on staff versed in Pierce fire apparatus. The service facility will be located within fifty (50) miles of the fire department.

In addition to the dealership, Pierce has service facilities located in both, Weyauwega, Wisconsin and Bradenton, Florida. Pierce also maintains a dedicated parts facility of over 100,000 square feet in Appleton, Wisconsin. The parts facility stocks in excess of $5,000,000 in parts dedicated to service and replacement parts. The parts facility employs a staff dedicated solely for the distribution and shipment of service and replacement parts.

Service parts for the apparatus being proposed can be found via Pierceparts.com which, is an interactive online tool that delivers information regarding your specific apparatus as well as the opportunity to register for training classes.

As a Pierce customer you have the ability to view the complete bill of materials for your specific apparatus, including assembly drawings, piece part drawings, and beneficial parts notations. You will also have the ability to search the complete Pierce item master through a parts search function which offers all Pierce SKU's and descriptions offered on all Pierce apparatus. Published component catalogs, which include proprietary systems along with an extensive operators manual library is available for easy reference.

Pierce Manufacturing maintains a dedicated service and warranty staff of over 35 personnel, dedicated to customer support, which also maintains a 24 hour 7 day a week toll free hot line, four (4) on staff EVTs, and offers hands-on repair and maintenance training classes multiple times a year.

LIABILITY
The successful bidder will defend any and all suits and assume all liability for the use of any patented process including any device or article forming a part of the apparatus or any appliance furnished under the contract.

INSURANCE PROVIDED BY BIDDER

COMMERCIAL GENERAL LIABILITY INSURANCE
The successful bidder will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of commercial general liability insurance:

Each Occurrence$1,000,000
Products/Completed Operations Aggregate$1,000,000

Page 286 ends

As Proposed 20 of 131 12-11-23
Personal and Advertising Injury$1,000,000
General Aggregate$2,000,000
Coverage will be written on a Commercial General Liability form. The policy will be written on an occurrence form and will include Contractual Liability coverage for bodily injury and property damage subject to the terms and conditions of the policy. The policy will include Owner as an additional insured when required by written contract.

COMMERCIAL AUTOMOBILE LIABILITY INSURANCE
The successful bidder will, during the performance of the contract, keep in force at least the following minimum limits of commercial automobile liability insurance and coverage will be written on a Commercial Automobile liability form:

Each Accident Combined Single Limit:$1,000,000

UMBRELLA/EXCESS LIABILITY INSURANCE
The successful bidder will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of umbrella liability insurance:

Aggregate:$3,000,000
Each Occurrence:$3,000,000
The umbrella policy will be written on an occurrence basis and at a minimum provide excess to the bidder's General Liability and Automobile Liability policies.

The required limits can be provided by one (1) or more policies provided all other insurance requirements are met.

Coverage will be provided by a carrier(s) rated A- or better by A.M. Best.

All policies will provide a 30-day notice of cancellation to the named insured. The Certificate of Insurance will provide the following cancellation clause: Should any of the above described polices be cancelled before the expiration date thereof, notice will be delivered in accordance with the policy provisions.

Bidder agrees to furnish owner with a current Certificate of Insurance with the coverages listed above along with the bid. The certificate will show the purchaser as certificate holder.

INSURANCE PROVIDED BY MANUFACTURER

PRODUCT LIABILITY INSURANCE
The manufacturer will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of Product Liability insurance:

Page 287 ends

As Proposed 21 of 131 12-11-23
Each Occurrence$1,000,000
Products/Completed Operations Aggregate$1,000,000
Coverage will be written on a Commercial General Liability form. The policy will be written on an occurrence form. The manufacturer's policy will include the owner as additional insured when required by written contract between the Owner and a Pierce authorized dealer.

UMBRELLA/EXCESS LIABILITY INSURANCE
The manufacturer will, during the performance of the contract and for three (3) years following acceptance of the product, keep in force at least the following minimum limits of umbrella liability insurance:

Each Occurrence:$25,000,000
Aggregate:$25,000,000
The umbrella policy will be written on an occurrence basis and provide excess to the manufacturer's General Liability/Products policies.

The required limits can be provided by one (1) or more policies provided all other insurance requirements are met.

Coverage will be provided by a carrier(s) rated A- or better by A.M. Best.

All policies will provide a 30-day notice of cancellation to the named insured. The Certificate of Insurance will provide the following cancellation clause: Should any of the above described polices be cancelled before the expiration date thereof, notice will be delivered in accordance with the policy provisions.

Manufacturer agrees to furnish owner with a current Certificate of Insurance with the coverages listed above along with the bid. The certificate will show the purchaser as the certificate holder.

SINGLE SOURCE MANUFACTURER
Pierce Manufacturing, Inc. provides an integrated approach to the design and manufacture of our products that delivers superior apparatus and a dedicated support team. From our facilities, the chassis, cab weldment, cab, pumphouse (including the sheet metal enclosure, valve controls, piping and operators panel) and body will be entirely designed, tested, and hand assembled to the customer's exact specifications. The electrical system either hardwired or multiplexed, will be both designed and integrated by Pierce Manufacturing. The warranties relative to these major components (excluding component warranties such as engine, transmission, axles, pump, etc.) will be provided by Pierce as a single source manufacturer. Pierce's single source solution adds value by providing a fully engineered product that offers durability, reliability, maintainability, performance, and a high level of quality.

Your apparatus will be manufactured in Appleton, Wisconsin.

Page 288 ends

As Proposed 22 of 131 12-11-23
NFPA 2016 STANDARDS
This unit will comply with the NFPA standards effective January 1, 2016, except for fire department directed exceptions. These exceptions will be set forth in the Statement of Exceptions.

Certification of slip resistance of all stepping, standing and walking surfaces will be supplied with delivery of the apparatus.

All horizontal surfaces designated as a standing or walking surface that are greater than 48.00" above the ground must be defined by a 1.00" wide line along its outside perimeter. Perimeter markings and designated access paths to destination points will be identified on the customer approval print and are shown as approximate. Actual location(s) will be determined based on materials used and actual conditions at final build. Access paths may pass through hose storage areas and opening or removal of covers or restraints may be required. Access paths may require the operation of devices and equipment such as the aerial device or ladder rack.

A plate that is highly visible to the driver while seated will be provided. This plate will show the overall height, length, and gross vehicle weight rating.

The manufacturer will have programs in place for training, proficiency testing and performance for any staff involved with certifications.

An official of the company will designate, in writing, who is qualified to witness and certify test results.

NFPA COMPLIANCY
Apparatus proposed by the bidder will meet the applicable requirements of the National Fire Protection Association (NFPA) as stated in current edition at time of contract execution. Fire department's specifications that differ from NFPA specifications will be indicated in the proposal as "non-NFPA".

PUMP TEST
Underwriters Laboratory (UL) will test, approved, and certify the pump. The test results and the pump manufacturer's certification of hydrostatic test; the engine manufacturer's certified brake horsepower curve; and the pump manufacturer's record of pump construction details will be forwarded to the Fire Department.

GENERATOR TEST
If the unit has a generator, Underwriters Laboratory (UL) will test, approved, and certify the generator.

The test results will be provided to the Fire Department at the time of delivery.

BREATHING AIR TEST
If the unit has breathing air, Pierce Manufacturing will draw an air sample from the air system and have the sample certified that the air quality meets the requirements of NFPA 1989, Standard on Breathing Air Quality for Fire and Emergency Services Respiratory Protection.

VEHICLE INSPECTION PROGRAM CERTIFICATION
To assure the vehicle is built to current NFPA 1901 standards, the apparatus, in its entirety, will be third-party, independent, audit-certified through Underwriters Laboratory (UL) that it is built and

Page 289 ends

As Proposed 23 of 131 12-11-23
complies to all applicable standards in the current edition. The certification includes: all design, production, operational, and performance testing of not only the apparatus, but those components that are installed on the apparatus.

A placard will be affixed in the driver's side area stating the third party agency, the date, the standard and the certificate number of the whole vehicle audit.

BID BOND NOT REQUESTED
A bid bond will not be included. If requested, the following will apply:

All bidders will provide a bid bond as security for the bid in the form of a 5% bid bond to accompany their bid. This bid bond will be issued by a Surety Company who is listed on the U.S. Treasury Departments list of acceptable sureties as published in Department Circular 570. The bid bond will be issued by an authorized representative of the Surety Company and will be accompanied by a certified power of attorney dated on or before the date of bid. The bid bond will include language, which assures that the bidder/principal will give a bond or bonds as may be specified in the bidding or contract documents, with good and sufficient surety for the faithful performance of the contract, including the Basic One (1) Year Limited Warranty, and for the prompt payment of labor and material furnished in the prosecution of the contract.

Notwithstanding any document or assertion to the contrary, any surety bond related to the sale of a vehicle will apply only to the Basic One (1) Year Limited Warranty for such vehicle. Any surety bond related to the sale of a vehicle will not apply to any other warranties that are included within this bid (OEM or otherwise) or to the warranties (if any) of any third party of any part, component, attachment or accessory that is incorporated into or attached to the vehicle. In the event of any contradiction or inconsistency between this provision and any other document or assertion, this provision will prevail.

PERFORMANCE BOND NOT REQUESTED
A performance bond will not be included. If requested at a later date, one will be provided to you for an additional cost and the following will apply:

The successful bidder will furnish a Performance and Payment bond (Bond) equal to 100 percent of the total contract amount within 30 days of the notice of award. Such Bond will be in a form acceptable to the Owner and issued by a surety company included within the Department of Treasury's Listing of Approved Sureties (Department Circular 570) with a minimum A.M. Best Financial Strength Rating of A and Size Category of XV. In the event of a bond issued by a surety of a lesser Size Category, a minimum Financial Strength rating of A+ is required.

Bidder and Bidder's surety agree that the Bond issued hereunder, whether expressly stated or not, also includes the surety's guarantee of the vehicle manufacturer's Bumper to Bumper warranty period included within this proposal. Owner agrees that the penal amount of this bond will be simultaneously amended to 25 percent of the total contract amount upon satisfactory acceptance and delivery of the vehicle(s) included herein. Notwithstanding anything contained within this contract to the contrary, the surety's liability for any warranties of any type will not exceed three (3) years from the date of such

Page 290 ends

As Proposed 24 of 131 12-11-23
satisfactory acceptance and delivery, or the actual Bumper to Bumper warranty period, whichever is shorter.

Due to global supply chain constraints, any delivery date contained herein is a good faith estimate as of the date of this order/contract, and merely an approximation based on current information. Delivery updates will be made available, and a final firm delivery date will be provided as soon as possible.

If the Producer Price Index of Components for Manufacturing [www.bls.gov Series ID: WPUID6112] ("PPI") has increased at a compounded annual growth rate of 5.0% or more between the month Pierce accepts the order ("Order Month") and a month 14 months prior to the then predicted Ready For Pickup date ("Evaluation Month"), then pricing may be updated in an amount equal to the increase in PPI over 5.0% for each year or fractional year between the Order Month and the Evaluation Month.

The seller will document any such updated price for the customer's approval before proceeding and provide an option to cancel the order.

APPROVAL DRAWING
A drawing of the proposed apparatus will be prepared and provided to the purchaser for approval before construction begins. The Pierce sales representative will also be provided with a copy of the same drawing. The finalized and approved drawing will become part of the contract documents. This drawing will indicate the chassis make and model, location of the lights, siren, horns, compartments, major components, etc.

A "revised" approval drawing of the apparatus will be prepared and submitted by Pierce to the purchaser showing any changes made to the approval drawing.

FINAL DRAWING
There will be a revised drawing of the truck with all the changes made during production provided at pickup.

DRAWING, COMPARTMENT LAYOUT
A basic drawing will be provided for the interior body compartments. This drawing will be provided for graphic representation only and will include such things as shelves, trays, reels, dividers, air control panels, air bottle storage bins, poly boxes & etc.

ELECTRICAL WIRING DIAGRAMS
Two (2) electrical wiring diagrams, prepared for the model of chassis and body, will be provided.

ENFORCER CHASSIS
The Pierce Enforcer™ is the custom chassis developed exclusively for the fire service. Chassis provided will be a new, tilt-type custom fire apparatus. The chassis will be manufactured in the apparatus body builder's facility eliminating any split responsibility. The chassis will be designed and manufactured for heavy-duty service, with adequate strength, capacity for the intended load to be sustained, and the type of service required. The chassis will be the manufacturer's first line tilt cab.

Page 291 ends

As Proposed 25 of 131 12-11-23

ANGLE OF DEPARTURE
The angle of departure will be 11.3 degrees degrees. This will be effective with the truck in a loaded state.

ANGLE OF APPROACH
The angle of approach will be 12.6 degrees degrees. This will be effective with the truck in a loaded state.

WHEELBASE
The wheelbase of the vehicle will be 180".

GVW RATING
The gross vehicle weight rating will be 43500.

FRAME
The chassis frame will be built with two (2) steel channels bolted to five (5) cross members or more, depending on other options of the apparatus. The side rails will have a 13.38" tall web over the front and mid sections of the chassis, with a continuous smooth taper to 10.75" over the rear axle. Each rail will have a section modulus of 25.992 cubic inches and a resisting bending moment (rbm) of 3,119,040 in-lb over the critical regions of the frame assembly, with a section modulus of 18.96 cubic inches with an rbm of 2,275,200 in-lb over the rear axle. The frame rails will be constructed of 120,000 psi yield strength heat-treated 0.38" thick steel with 3.50" wide flanges.

FRAME REINFORCEMENT
In addition, a mainframe internal liner will be provided. The liner will be an internal "C" design that steps to an internal "L" design over the rear axle. It will be heat-treated steel measuring 12.50" x

3.00" x 0.25" through the front portion of the liner, stepping to 9.38" x 3.00" x 0.25" through the rear portion of the liner. Each liner will have a section modulus of 13.58 cubic inches, yield strength of 110,000 psi, and rbm of 1,494,042 in-lb. Total rbm at wheelbase center will be 4,391,869 in-lb.

The frame liner will be mounted inside of the chassis frame rail and extend the full length of the frame.

FRONT NON DRIVE AXLE
The Oshkosh TAK-4® front axle will be of the independent suspension design with a ground rating of 19,500 lb.

Upper and lower control arms will be used on each side of the axle. Upper control arm castings will be made of 100,000-psi yield strength 8630 steel and the lower control arm casting will be made of 55,000-psi yield ductile iron.

The center cross members and side plates will be constructed out of 80,000-psi yield strength steel.

Each control arm will be mounted to the center section using elastomer bushings. These rubber bushings will rotate on low friction plain bearings and be lubricated for life. Each bushing will also have a flange end to absorb longitudinal impact loads, reducing noise and vibrations.

Page 292 ends

As Proposed 26 of 131 12-11-23
There will be nine (9) grease fittings supplied, one (1) on each control arm pivot and one (1) on the steering gear extension.

The upper control arm will be shorter than the lower arm so that wheel end geometry provides positive camber when deflected below rated load and negative camber above rated load.

Camber at load will be zero degrees for optimum tire life.

The ball joint bearing will be of low friction design and be maintenance free.

Toe links that are adjustable for alignment of the wheel to the center of the chassis will be provided.

The wheel ends must have little to no bump steer when the chassis encounters a hole or obstacle.

The steering linkage will provide proper steering angles for the inside and outside wheel, based on the vehicle wheelbase.

The axle will have a turning angle of up to 45 degrees.

FRONT SUSPENSION
Front Oshkosh TAK-4™ independent suspension will be provided with a minimum ground rating of 19,500 lb.

The independent suspension system will be designed to provide maximum ride comfort. The design will allow the vehicle to travel at highway speeds over improved road surfaces and at moderate speeds over rough terrain with minimal transfer of road shock and vibration to the vehicle's crew compartment.

Each wheel will have torsion bar type spring. In addition, each front wheel end will also have energy absorbing jounce bumpers to prevent bottoming of the suspension.

The suspension design will be such that there is at least 10.00" of total wheel travel and a minimum of

3.75" before suspension bottoms.

The torsion bar anchor lock system allows for simple lean adjustments, without the use of shims. One can adjust for a lean within 15 minutes per side. Anchor adjustment design is such that it allows for ride height adjustment on each side.

The independent suspension was put through a durability test that simulated 140,000 miles of inner city driving.

FRONT SHOCK ABSORBERS
KONI heavy-duty telescoping shock absorbers will be provided on the front suspension.

FRONT OIL SEALS
Oil seals with viewing window will be provided on the front axle.

Page 293 ends

As Proposed 27 of 131 12-11-23

FRONT TIRES
Front tires will be Goodyear 425/65R22.50 radials, 20 ply Armor MAX MSA, rated for 22,800 lb maximum axle load and 75 mph maximum speed.

The tires will be mounted on Alcoa 22.50" x 12.25" polished aluminum disc type wheels with a ten (10)stud, 11.25" bolt circle.

REAR AXLE
The rear axle will be a Meritor™, Model RS-24-160, with a capacity of 24,000 lb.

TOP SPEED OF VEHICLE
A rear axle ratio will be furnished to allow the vehicle to reach a top speed of 68 mph / 109 kph.

REAR SUSPENSION
The rear suspension will be Standens, semi-elliptical, 3.00" wide x 53.00" long, 12-leaf pack with a ground rating of 24,000 lb. The spring hangers will be castings.

The two (2) top leaves will wrap the forward spring hanger pin, and the rear of the spring will be a slipper style end that will ride in a rear slipper hanger. To reduce bending stress due to acceleration and braking, the front eye will be a berlin eye that will place the front spring pin in the horizontal plane within the main leaf.

A steel encased rubber bushing will be used in the spring eye. The steel encased rubber bushing will be maintenance free and require no lubrication.

REAR OIL SEALS
Oil seals will be provided on the rear axle(s).

MODIFICATION
Rear suspension axle spacers will be added.

REAR TIRES
The rear tires will be four (4) Goodyear Armor Max MSD, 12R22.50 radials, load range H, rated for 27,120 lb maximum axle load and 68 mph maximum speed.

The tires will be mounted on 22.50" x 9.00" polished aluminum disc wheels with a ten (10) stud,11.25" bolt circle. The wheels will be Alcoa© part number 894652, hub piloted.

TIRE BALANCE
All tires will be balanced with Counteract balancing beads. The beads will be inserted into the tire and eliminate the need for wheel weights.

Page 294 ends

As Proposed 28 of 131 12-11-23

TIRE PRESSURE MANAGEMENT
There will be a RealWheels LED AirSecure™ tire alert pressure management system provided, that will monitor each tire's pressure. A sensor will be provided on the valve stem of each tire for a total of six (6) tires.

The sensor will calibrate to the tire pressure when installed on the valve stem for pressures between 10 and 200 psi. The sensor will activate an integral battery operated LED when the pressure of that tire drops 5 to 8 psi.

Removing the cap from the sensor will indicate the functionality of the sensor and battery. If the sensor and battery are in working condition, the LED will immediately start to flash.

FRONT HUB COVERS
Stainless steel hub covers will be provided on the front axle. An oil level viewing window will be provided.

REAR HUB COVERS
A pair of stainless steel high hat hub covers will be provided on rear axle hubs.

MUD FLAPS
Mud flaps with a Pierce logo will be installed behind the front and rear wheels.

WHEEL CHOCKS PROVIDED BY FIRE DEPARTMENT
NFPA 1901, 2016 edition, section 5.9.4 requires two (2) or more wheel chocks mounted in readily accessible locations, that together will hold the apparatus, when loaded to its GVWR or GCWR, on a hard surface with a 20 percent grade with the transmission in neutral and the parking brake released.

The wheel chocks are not on the apparatus as manufactured. The fire department will provide and install these wheel chocks.

Wheel Chock Brackets Provided by Fire Department
The wheel chock brackets are not on the apparatus as manufactured. The fire department will provide and install the wheel chock brackets.

ANTI-LOCK BRAKE SYSTEM
The vehicle will be equipped with a Meritor WABCO 4S4M, anti-lock braking system. The ABS will provide a 4-channel anti-lock braking control on both the front and rear wheels. A digitally controlled system that utilizes microprocessor technology will control the anti-lock braking system. Each wheel will be monitored by the system. When any particular wheel begins to lockup, a signal will be sent to the control unit. This control unit then will reduce the braking of that wheel for a fraction of a second and then reapply the brake. This anti-lock brake system will eliminate the lockup of any wheel thus helping to prevent the apparatus from skidding out of control.

BRAKES
The service brake system will be full air type.

Page 295 ends

As Proposed 29 of 131 12-11-23
The front brakes will be Knorr/Bendix disc type with a 17.00" ventilated rotor for improved stopping distance.

The brake system will be certified, third party inspected, for improved stopping distance.

The rear brakes will be Meritor™, Disc Plus, Model EX225, disc operated with automatic slack adjusters and a 17.00" ventilated rotor for improved stopping distance.

BRAKE SYSTEM AIR COMPRESSOR
The air compressor will be a Cummins/WABCO with 18.7 cubic feet per minute output.

BRAKE SYSTEM
The brake system will include:
 Brake treadle valve
 Heated automatic moisture ejector on air dryer
 Total air system minimum capacity of 4,272 cubic inches  Two (2) air pressure gauges with a red warning light and an audible alarm, that activates when air pressure falls below 60 psi
 Spring set parking brake system
 Parking brake operated by a push-pull style control valve  A parking "brake on" indicator light on instrument panel  Park brake relay/inversion and anti-compounding valve, in conjunction with a double check valve system, with an automatic spring brake application at 40 psi  A pressure protection valve to prevent all air operated accessories from drawing air from the air system when the system pressure drops below 80 psi (550 kPa)  1/4 turn drain valves on each air tank
The air tank will be primed and painted to meet a minimum 750 hour salt spray test.

The air tanks will be [Paint Color, Air Tanks] .

To reduce the effects of corrosion, the air tank will be mounted with stainless steel brackets.

BRAKE SYSTEM AIR DRYER
The air dryer will be WABCO System Saver 1200 with spin-on coalescing filter cartridge and 100 watt heater.

BRAKE LINES
Color-coded nylon brake lines will be provided. The lines will be wrapped in a heat protective loom in the chassis areas that are subject to excessive heat.

AIR INLET
One (1) air inlet with 3D series male coupling will be provided. It will allow station air to be supplied to the apparatus brake system through a shoreline hose. The inlet will be located forward in the driver side lower step well of cab. A check valve will be provided to prevent reverse flow of air. The inlet will

Page 296 ends

As Proposed 30 of 131 12-11-23
discharge into the "wet" tank of the brake system. A mating female fitting will also be provided with the loose equipment.

RECESSED BOX FOR AIR FITTING
One (1) air inlet will have an smooth aluminum recessed box provided. The box will allow the air fitting(s) to be recessed inside the stepwell within the same box as the cab lift receptacle to prevent damage. in the driver side step well.

A treadplate door with lift and turn latch will be provided over the opening.

ENGINE
The chassis will be powered by an electronically controlled engine as described below:

Make: Cummins
Model: X10
Power: 450 hp at 2100 rpm
Torque: 1650 lb-ft at 1400 rpm
Governed
Speed:
2200 rpm
Emissions Level: EPA 2027
Fuel: Diesel
Cylinders: Six (6)
Displacement: 606 cubic inches (9.9L)
Starter: Delco 39MT™
Fuel Filters: Spin-on style primary filter with water separator and water-in-fuel sensor.

Secondary spin-on style filter.

The engine will include On-board diagnostics (OBD), which provides self diagnostic and reporting. The system will give the owner or repair technician access to state of health information for various vehicle sub systems. The system will monitor vehicle systems, engine and after treatment. The system will illuminate a malfunction indicator light on the dash console if a problem is detected.

HIGH IDLE
A high idle switch will be provided, inside the cab, on the instrument panel, that will automatically maintain a preset engine rpm. A switch will be installed, at the cab instrument panel, for activation/deactivation.

The high idle will be operational only when the parking brake is on and the truck transmission is in neutral. A green indicator light will be provided, adjacent to the switch. The light will illuminate when the above conditions are met. The light will be labeled "OK to Engage High Idle."

ENGINE BRAKE
A Jacobs® engine brake is to be installed with the controls located on the instrument panel within easy reach of the driver.

Page 297 ends

As Proposed 31 of 131 12-11-23
The driver will be able to turn the engine brake system on/off and have a high, medium and low setting.

The engine brake will activate when the system is on and the throttle is released.

The high setting of the brake application will activate and work simultaneously with the variable geometry turbo (VGT) provided on the engine.

The engine brake will be installed in such a manner that when the engine brake is slowing the vehicle the brake lights are activated.

The ABS system will automatically disengage the auxiliary braking device, when required.

CLUTCH FAN
A fan clutch will be provided. The fan clutch will be automatic when the pump transmission is in "Road" position, and constantly engaged when in "Pump" position.

ENGINE AIR INTAKE
The engine air intake will be located above the engine cooling package. It will draw fresh air from the front of the apparatus through the radiator grille.

The ember separator is designed to prevent road dirt and recirculating hot air from entering the engine.

The ember separator will be easily accessible by tilting the cab.

EXHAUST SYSTEM
The exhaust system will be stainless steel from the turbo to the engine's aftertreatment device. The exhaust system will include an aftertreatment device to meet current EPA standards. An insulation wrap will be provided on all exhaust pipe between the turbo and the aftertreatment device to minimize the transfer of heat to the cab.

The exhaust will terminate horizontally ahead of the right side rear wheels and will be extend 2.00" past the body rub rail . The exhaust pipes will be aluminized steel.

There will be an aluminized steel exhaust diffuser with a standard straight tip on the end provided to reduce the temperature of the exhaust as it exits. Heat deflector shields will be provided to isolate chassis and body components from the heat of the tailpipe diffuser.

EXHAUST MODIFICATION
An adapter for the Plymovent bladder exhaust extraction system will be provided on the end of the tail pipe.

RADIATOR
The radiator and the complete cooling system will meet or exceed the current edition of applicable NFPA and engine manufacturer cooling system standards.

Page 298 ends

As Proposed 32 of 131 12-11-23
For maximum corrosion resistance and cooling performance, the entire radiator core will be constructed using long life aluminum alloy. The radiator core will consist of aluminum fins, having a serpentine design, brazed to aluminum tubes.

The radiator core will have a minimum front area of 1060 square inches.

Supply tank will be made of heavy duty glass-reinforced nylon and the return tank will be made of aluminum. Both tanks will be crimped onto the core assembly using header tabs and a compression gasket to complete the radiator core assembly. There will be a full steel frame around the inserts to enhance cooling system durability and reliability.

The radiator will be compatible with commercial antifreeze solutions.

The radiator assembly will be isolated from the chassis frame rails with rubber isolators to prevent the development of leaks caused by twisting or straining when the apparatus operates over uneven terrain.

The radiator will include a de-aeration/expansion tank. For visual coolant level inspection, the radiator will have a built-in sight glass. The radiator will be equipped with a 15 psi pressure relief cap.

A drain port will be located at the lowest point of the cooling system and/or the bottom of the radiator to permit complete flushing of the coolant from the system.

Shields or baffles will be provided to prevent recirculation of hot air to the inlet side of the radiator.

COOLANT LINES
Gates, or Goodyear, rubber hose will be used for all engine coolant lines installed by Pierce Manufacturing.

Hose clamps will be stainless steel constant torque type to prevent coolant leakage. They will expand and contract according to coolant system temperature thereby keeping a constant clamping pressure on the hose.

FUEL TANK
A 65 gallon fuel tank will be provided and mounted at the rear of the chassis. The tank will be constructed of 12-gauge, hot rolled steel. It will be equipped with swash partitions and a vent. To eliminate the effects of corrosion, the fuel tank will be mounted with stainless steel straps.

A 0.75" drain plug will be located in a low point of the tank for drainage.

A fill inlet will be located on the left hand side of the body and is covered with a hinged, spring loaded, stainless steel door that is marked "Ultra Low Sulfur - Diesel Fuel Only." A 0.50" diameter vent will be installed from tank top to just below fuel fill inlet.

The fuel tank will meet all FHWA 393.67 requirements including a fill capacity of 95 percent of tank volume.

Page 299 ends

As Proposed 33 of 131 12-11-23
All fuel lines will be provided as recommended by the engine manufacturer.

DIESEL EXHAUST FLUID TANK
A 4.5 gallon diesel exhaust fluid (DEF) tank will be provided and mounted in the driver's side body rearward of the rear axle.

A 0.50" drain plug will be provided in a low point of the tank for drainage.

A fill inlet will be provided and marked "Diesel Exhaust Fluid Only". The fill inlet will be located adjacent to the air bottle storage behind a common door on the driver side of the vehicle.

The tank will meet the engine manufacturers requirement for 10 percent expansion space in the event of tank freezing.

The tank will include an integrated heater unit that utilizes engine coolant to thaw the DEF in the event of freezing.

FUEL PRIMING PUMP
A Cummins automatic electronic fuel priming pump will be integrated as part of the engine.

FUEL COOLER
An air to fuel cooler will be installed in the engine fuel return line.

The fuel filler cap will have a retaining chain and holder provided on the fuel fill door.

TRANSMISSION
An Allison 6th generation, Model EVS 4000P, electronic, torque converting, automatic transmission will be provided.

The transmission will be equipped with prognostics to monitor oil life, filter life, and transmission health. A wrench icon on the shift selector's digital display will indicate when service is due.

Two (2) PTO openings will be located on left side and top of converter housing (positions 8 o'clock and 1 o'clock).

A transmission temperature gauge with an amber light and buzzer will be installed on the cab instrument panel.

TRANSMISSION SHIFTER
A six (6)-speed push button shift module will be mounted to right of driver on console. Shift position indicator will be indirectly lit for after dark operation.

The transmission ratio will be:
1st 3.51 to 1.00
2nd 1.91 to 1.00
3rd 1.43 to 1.00

Page 300 ends

As Proposed 34 of 131 12-11-23
4th 1.00 to 1.00
5th 0.75 to 1.00
6th 0.64 to 1.00
R 4.80 to 1.00

TRANSMISSION PROGRAMMING
The transmission will be programmed to automatically shift the transmission to neutral when the parking brake is set to simplify operation and increase operational safety.

TRANSMISSION COOLER
A Modine plate and fin transmission oil cooler will be provided using engine coolant to control the transmission oil temperature.

DRIVELINE
Drivelines will be a heavy-duty metal tube and be equipped with Spicer® 1810 universal joints.

The shafts will be dynamically balanced before installation.

A splined slip joint will be provided in each driveshaft where the driveline design requires it. The slip joint will be coated with Glidecoat® or equivalent.

STEERING
Dual Sheppard, Model M110, steering gears, with integral heavy-duty power steering, will be provided.

For reduced system temperatures, the power steering will incorporate an air to oil cooler and an Eaton, Model VN20, hydraulic pump with integral pressure and flow control. All power steering lines will have wire braded lines with crimped fittings.

A tilt and telescopic steering column will be provided to improve fit for a broader range of driver configurations.

STEERING WHEEL
The steering wheel will be 18.00" in diameter, have tilting and telescoping capabilities, and a 4-spoke design.

LOGO AND CUSTOMER DESIGNATION ON HORN BUTTON
The steering wheel will have an emblem containing the Pierce logo and customer name. The emblem will have three (3) rows of text for the customer's department name. There will be a maximum of eight (8) characters in the first row, 11 characters in the second row and 11 characters in the third row.

The first row of text will be: Fountain
The second row of text will be: Valley
The third row of text will be: Fire Dept.

Page 301 ends

As Proposed 35 of 131 12-11-23
BUMPER
A one (1) piece bumper manufactured from 0.25" formed steel with a 0.38" bend radius will be provided. The bumper will be a minimum of 10.00" high with a 1.50" top and bottom flange, and will extend 19.00" from the face of the cab. The bumper will be 95.28" wide with 45 degree corners and side plates. The bumper will be metal finished and painted job color.

To provide adequate support strength, the bumper will be mounted directly to the front of the C channel frame. The frame will be a bolted modular extension frame constructed of 50,000 psi tensile steel. The frame will include a 6.00" x 2.00" x 0.25" wall steel tube with 0.38" gusset plates for increased support of the bumper assembly.

Gravel Pan
A gravel pan, constructed of bright aluminum treadplate, will be furnished between the bumper and the cab face. The pan will be properly supported from the underside to prevent flexing and vibration.

CENTER HOSE TRAY
A hose tray, constructed of aluminum, will be placed in the center of the bumper extension. The tray will be "stepped" under the cab by 4.00" to provide additional capacity.

The tray will have a capacity of 100' of 1.75" double jacket cotton-polyester hose.

Black rubber grating will be provided at the bottom of the tray. Drain holes are also provided.

RIGHT SIDE HOSE TRAY
A hose tray will be placed in the right side of the extended bumper.

The tray will be 23.00" wide. The front outside corner of the tray will be cut on a 45 degree angle to maximize the space available in the bumper extension.

The tray will have a capacity of 30' of 4"
Black rubber grating will be provided at the bottom of the tray. Drain holes will be provided.

LIFT AND TOW MOUNTS
Mounted to the frame extension will be lift and tow mounts. The lift and tow mounts will be designed and positioned to adapt to certain tow truck lift systems.

The lift and tow mounts with eyes will be painted the same color as the frame.

TOW HOOKS
No tow hooks are to be provided. This truck will be equipped with a lift and tow package with integral tow eyes.

DROP DOWN BUMPER SECTION WITH COVER
A front section of the bumper will be hinged to drop down passenger side hose tray. A treadplate cover will be provided to meet with the top of the drop down section of the bumper. A single release D-ring latch will be provided in the center of the treadplate cover.

Page 302 ends

As Proposed 36 of 131 12-11-23

TRAY COVER
A bright aluminum treadplate cover will be provided over the full width tray. The cover will be flush with the gravel pan.

The cover will be full width of the tray.

The cover will be attached with a stainless steel hinge.

The cover will be secured with D-ring latch on each side in the closed position and mechanical stay arm will hold the cover in the open position.

FRONT BUMPER UL-LX COATING
Protective black UL-LX® coating will be provided on the outside exterior of the top front bumper flange. It will not be sprayed on the underside of the flange.

The lining will be properly installed by an authorized UL-LX dealer.

CAB
The Enforcer cab will be designed specifically for the fire service and manufactured by the chassis builder.

The cab will be built by the apparatus manufacturer in a facility located on the manufacturer's premises.

For reasons of structural integrity and enhanced occupant protection, the cab will be a heavy duty design, constructed to the following minimal standards.

The cab will have 12 main vertical structural members located in the A-pillar (front cab corner posts), B-pillar (side center posts), C-pillar (rear corner posts), and rear wall areas. The A-pillar will be constructed of solid A356-T5 aluminum castings. The B-pillar and C-pillar will be constructed from

0.13" wall extrusions. The rear wall will be constructed of two (2) 2.00" x 2.00" outer aluminum extrusions and two (2) 2.00" x 1.00" inner aluminum extrusions. All main vertical structural members will run from the floor to 4.625" x 3.864" x 0.090" thick roof extrusions to provide a cage-like structure with the A-pillar and roof extrusions being welded into a 0.25" thick corner casting at each of the front corners of the roof assembly.

The front of the cab will be constructed of a 0.13" firewall plate, covered with a 0.090" front skin (for a total thickness of 0.22"), and reinforced with a full width x 0.50" thick cross-cab support located just below the windshield and fully welded to the engine tunnel. The cross-cab support will run the full width of the cab and weld to each A-pillar, the 0.13" firewall plate, and the front skin.

The cab floors will be constructed of 0.125" thick aluminum plate and reinforced at the firewall with an additional 0.25" thick cross-floor support providing a total thickness of 0.375" of structural material at the front floor area. The front floor area will also be supported with two (2) triangular 0.30" wall extrusions that also provides the mounting point for the cab lift. This tubing will run from the floor

Page 303 ends

As Proposed 37 of 131 12-11-23
wireway of the cab to the engine tunnel side plates, creating the structure to support the forces created when lifting the cab.

The cab will be 96.00" wide (outside door skin to outside door skin) to maintain maximum maneuverability.

The forward cab section will have an overall height (from the cab roof to the ground) of approximately

99.00". The crew cab section will have a 10.00" raised roof, with an overall cab height of approximately 109.00". The overall height listed will be calculated based on a truck configuration with the lowest suspension weight rating, the smallest diameter tires for the suspension, no water weight, no loose equipment weight, and no personnel weight. Larger tires, wheels, and suspension will increase the overall height listed.

The floor to ceiling height inside the crew cab will be 63.50" in the forward facing outboard positions and 54.50" in the forward facing center position.

The crew cab floor will measure 46.00" from the rear wall to the back side of the rear facing seat risers.

The medium block engine tunnel, at the rearward highest point (knee level), will measure 61.50" to the rear wall. The big block engine tunnel will measure 51.50" to the rear wall.

The crew cab will be a totally enclosed design with the interior area completely open to improve visibility and verbal communication between the occupants.

The cab will be a full tilt cab style.

A 3-point cab mount system with rubber isolators will improve ride quality by isolating chassis vibrations from the cab.

CAB ROOF DRIP RAIL
For enhanced protection from inclement weather, a drip rail will be furnished on the sides of the cab.

The drip rail will be painted to match the cab roof, and bonded to the sides of the cab. The drip rail will extend the full length of the cab roof.

CAB PUMP ENCLOSURE
The rear of the cab will be made to house the fire pump below the forward facing crew cab seats. The cab side panels will be notched to accommodate the pump panel.

FENDER LINERS
Full circular inner fender liners in the wheel wells will be provided.

PANORAMIC WINDSHIELD
A one (1)-piece safety glass windshield will be provided with over 2,775 square inches of clear viewing area. The windshield will be full width and will provide the occupants with a panoramic view. The windshield will consist of three (3) layers: outer light, middle safety laminate, and inner light. The

Page 304 ends

As Proposed 38 of 131 12-11-23
outer light layer will provide superior chip resistance. The middle safety laminate layer will prevent the windshield glass pieces from detaching in the event of breakage. The inner light will provide yet another chip resistant layer. The cab windshield will be bonded to the aluminum windshield frame using a urethane adhesive. A custom frit pattern will be applied on the outside perimeter of the windshield for a finished automotive appearance.

WINDSHIELD WIPERS
Three (3) electric windshield wipers with washer will be provided that meet FMVSS and SAE requirements.

The washer reservoir will be able to be filled without raising the cab.

ENGINE TUNNEL
Engine hood side walls will be constructed of 0.375" aluminum. The top will be constructed of 0.125" aluminum and will be tapered at the top to allow for more driver and passenger elbow room.

The engine hood will be insulated for protection from heat and sound. The noise insulation keeps the dBA level within the limits stated in the current edition of applicable NFPA standards.

The engine tunnel will be no higher than 17.00" off the crew cab floor.

CAB REAR WALL EXTERIOR COVERING
The exterior surface of the rear wall of the cab will be overlaid with bright aluminum treadplate except for areas that are not typically visible when the cab is lowered.

CAB LIFT
A hydraulic cab lift system will be provided consisting of an electric powered hydraulic pump, dual lift cylinders, and necessary hoses and valves.

Hydraulic pump will have a manual override for backup in the event of electrical failure.

Lift controls will be located in the recessed box of the driver side stepwell.

The cab will be capable of tilting 43 degrees to accommodate engine maintenance and removal.

The cab will be locked down by a 2-point normally closed spring loaded hook type latch that fully engages after the cab has been lowered. The system will be hydraulically actuated to release the normally closed locks when the cab lift control is in the raised position and cab lift system is under pressure. When the cab is completely lowered and system pressure has been relieved, the spring loaded latch mechanisms will return to the normally closed and locked position.

The hydraulic cylinders will be equipped with a velocity fuse that protects the cab from accidentally descending when the control is located in the tilt position.

For increased safety, a redundant mechanical stay arm will be provided that must be manually put in place on the left side between the chassis and cab frame when the cab is in the raised position. This device will be manually stowed to its original position before the cab can be lowered.

Page 305 ends

As Proposed 39 of 131 12-11-23
Cab Lift Interlock
The cab lift system will be interlocked to the parking brake. The cab tilt mechanism will be active only when the parking brake is set and the ignition switch is in the on position. If the parking brake is released, the cab tilt mechanism will be disabled.

GRILLE
A bright finished aluminum mesh grille screen, inserted behind a bright finished grille surround, will be provided on the front center of the cab.

SCUFFPLATE
A bright aluminum treadplate scuffplate will be provided on the entire rear vertical surface of the engine tunnel.

DOOR JAMB SCUFFPLATES
All cab door jambs will be furnished with a 1.00" brushed stainless steel scuffplate, mounted on the striker side of the jamb.

MIRRORS
A Retrac Aerodynamic, Model 613295, dual vision, motorized, west coast style mirror with chrome finish will be mounted on each side of the front cab door with spring loaded retractable arms. The flat glass and convex glass will be adjustable with a remote control within reach of the driver.

DOORS
To enhance entry and egress to the cab, the forward cab door openings will be a minimum of 37.50" wide x 63.37" high. The crew cab doors will be located on the sides of the cab and will be constructed in the same manner as the forward cab doors. The crew cab door openings will be a minimum of

34.30" wide x 73.25" high.

The forward cab and crew cab doors will be constructed of extruded aluminum with a nominal material thickness of 0.093". The exterior door skins will be constructed from 0.090" aluminum.

A customized, vertical, pull-down type door handle will be provided on the exterior of each cab door.

The finish of the door handle will be chrome/black. The exterior handle will be designed specifically for the fire service to prevent accidental activation, and will provide 4.00" wide x 2.00" deep hand clearance for ease of use with heavy gloved hands.

Each door will also be provided with an interior flush, open style paddle handle that will be readily operable from fore and aft positions, and be designed to prevent accidental activation. The interior handles will provide 4.00" wide x 1.25" deep hand clearance for ease of use with heavy gloved hands.

The cab doors will be provided with both interior (rotary knob) and exterior (keyed) locks exceeding FMVSS standards. The keys will be Model 751. The locks will be capable of activating when the doors are open or closed. The doors will remain locked if locks are activated when the doors are opened, then closed.

Page 306 ends

As Proposed 40 of 131 12-11-23
A full length, heavy duty, stainless steel, piano-type hinge with a 0.38" pin and 11 gauge leaf will be provided on all cab doors. There will be double automotive-type rubber seals around the perimeter of the door framing and door edges to ensure a weather-tight fit.

A chrome grab handle will be provided on the inside of each cab door for ease of entry.

A red webbed grab handle will be installed on the crew cab door stop strap. The grab handles will be securely mounted.

The bottom cab step at each cab door location will be located below the cab doors and will be exposed to the exterior of the cab.

Door Panels
The inner cab door panels will be constructed out of brushed stainless steel.

ELECTRIC OPERATED CAB DOOR WINDOWS
All four (4) cab doors will be equipped with electric operated windows with one (1) flush mounted automotive style switch on each door. The driver's door will have four (4) switches, one (1) to control each door window.

Each switch will allow intermittent or auto down operation for ease of use. Auto down operation will be actuated by holding the window down switch for approximately 1 second.

ELECTRIC CAB DOOR LOCKS
The front driver and officer doors will have a door lock master switch that will control all front and rear crew cab door locks. Each rear crew cab door will have its own lock control.

There will be one (1) concealed switch located in an easily accessible chassis specific location that will unlock all the doors.

The lock system will include two (2) key FOBs that allow for keyless entry into the vehicle. The key FOB system will use code hopping technology for high security and be FCC part 15 compliant.

KEY PAD FOR ELECTRIC DOOR LOCKS
For improved convenience, the cab door locks will include a Trimark keypad entry system to provide complete keyless entry to the cab. There will be two (2) keypads provided, located one (1) each side of the cab behind the front cab doors. The keypads will include visual and audio feedback to confirm activation and acknowledge correct entry code. For enhanced night time use, the keypads will be lighted. For increased security, the system will allow over 3,000 possible code combinations.

CAB STEPS
The forward cab and crew cab access steps will be a full size two (2) step design to provide largest possible stepping surfaces for safe ingress and egress. The bottom steps will be designed with a grip pattern punched into bright aluminum treadplate material to provide support, slip resistance, and drainage. The bottom steps will be a bolt-in design to minimize repair costs should they need to be

Page 307 ends

As Proposed 41 of 131 12-11-23
replaced. The forward cab steps will be a minimum 25.00" wide, and the crew cab steps will be 21.65" wide with a 10.00" minimum depth. The inside cab steps will not exceed 16.50" in height.

The vertical surfaces of the step well will be aluminum treadplate.

CAB EXTERIOR HANDRAILS
A Hansen knurled aluminum handrail will be provided adjacent to each cab and crew cab door opening to assist during cab ingress and egress. Each handrail will be provided with white LED lights. The lights will be activated when the parking brake is applied and when the headlight switch is activated.

The LED lights may be load managed.

STEP LIGHTS
There will be six (6) white LED step lights with chrome housing installed for cab and crew cab access steps.
 One (1) light for the left access steps.
 Two (2) lights for the left side crew cab access steps.  Two (2) lights for the right side crew cab access steps.  One (1) light for the right side access step.

In order to ensure exceptional illumination, each light will provide a minimum of 25 foot-candles (fc) covering an entire 15" x 15" square placed ten (10) inches below the light and a minimum of 1.5 fc covering an entire 30" x 30" square at the same ten (10) inch distance below the light.

The lights will be activated when the battery switch is on and the adjacent door is opened.

FENDER CROWNS
Stainless steel fender crowns will be installed at the cab wheel openings. The fender crowns will have a radius outside corner that will allow the fender crown to extend out further than the standard width crown, thus extending beyond the sidewall of the front tires and allow the crew cab doors to open fully.

CREW CAB WINDOWS
One (1) fixed window with tinted glass will be provided on each side of the cab, to the rear of the front cab door. The windows will be sized to enhance light penetration into the cab interior. The windows will measure 18.70" wide x 23.75" high.

RIGHT SIDE ROLLUP CREW CAB DOOR WINDOW TINT
The rollup window in the right side crew cab door will be tinted privacy dark gray.

BEHIND LEFT SIDE CAB DOOR WINDOW TINT
The window behind the left side front cab door will be tinted privacy dark gray.

BEHIND RIGHT SIDE CAB DOOR WINDOW TINT
The window behind the right side front cab door will be tinted privacy dark gray.

Page 308 ends

As Proposed 42 of 131 12-11-23

LEFT SIDE ROLLUP CREW CAB DOOR WINDOW TINT
The rollup window in the left side crew cab door will be tinted privacy dark gray.

LEFT SIDE UPPER CREW CAB DOOR WINDOW TINT
The upper window in the left side crew cab door will be tinted privacy dark gray.

RIGHT SIDE UPPER CREW CAB DOOR WINDOW TINT
The upper window in the right side crew cab door will be tinted privacy dark gray.

CAB DASH
The driver side dash, switch panel located to the right of the driver, and center console will be constructed of metal and painted black.

The officer side dash will be a flat top design with an upper beveled edge to provide easy maintenance and will be constructed out of aluminum and painted to match the cab interior.

The instrument gauge cluster will be surrounded with a high impact ABS plastic contoured to the same shape of the instrument gauge cluster.

BRACKET TO MOUNT SCBA HOLDER
There will be two (2) bracket(s) provided for mounting air bottle brackets. Each bracket will be mounted on a 45 degree angle mounting plate located in the crew cab. Each mounting bracket will be designed to hold one (1) Ziamatic SCBA holder.

The bracket(s) will be mounted in the forward facing outboard crew cab positions.

EQUIPMENT MOUNTING TRAY(S)
There will be one (1) tray(s) for mounting of equipment located As large as possible on the lower portion of the rear engine tunnel, next to air cleaner blister.

Each tray will have a 1.00" lip on all sides.

Each tray will be fabricated from aluminum and will be painted to match the cab interior.

Tray not intended for storage of loose equipment. Items stored on tray will be permanently attached to meet current edition of applicable NFPA standards.

MOUNTING SYSTEM
There will be one (1) section(s) of Pac Trac equipment mounting systems located one strip across the rear wall of the crew cab.

Pac Trac mounts will be certified by Pac Trac to meet the current edition of applicable NFPA standards for mounting of equipment inside the cab.

MOUNTING PLATE ON ENGINE TUNNEL
Equipment installation provisions will be installed on the engine tunnel.

Page 309 ends

As Proposed 43 of 131 12-11-23
A .25" smooth aluminum plate will be bolted to the top surface of the engine tunnel. The plate will follow the contour of the engine tunnel and will run the entire length of the engine tunnel. The plate will be spaced off the engine tunnel .50" to allow for wire routing below the plate.

The mounting surface will be painted to match the cab interior.

CAB INTERIOR
The cab interior will be constructed of primarily metal (painted aluminum) to withstand the severe duty cycles of the fire service.

The engine tunnel will be padded and covered, on the top and sides, with black 36 ounce leather grain vinyl resistant to oil, grease, and mildew.

For durability and ease of maintenance, the cab interior side walls will be painted aluminum. The rear wall will be painted aluminum.

The headliner will be installed in both forward and rear cab sections. Headliner material will be vinyl.

A sound barrier will be part of its composition. Material will be installed on an aluminum sheet and securely fastened to interior cab ceiling.

The forward portion of the cab headliner will permit easy access for service of electrical wiring or other maintenance needs.

All wiring will be placed in metal raceways.

CAB INTERIOR UPHOLSTERY
The cab interior upholstery will be 36 oz dark silver gray vinyl.

CAB INTERIOR PAINT
The cab interior metal surfaces, excluding the rear heater panels, will be painted black, vinyl texture paint.

The rear heater panels will be painted black, vinyl textured paint.

CAB FLOOR
A small blister will be provided at the rear of the engine tunnel for chassis components. The blister will be coated with black UL-LX® polyurethane/polyurea elastomer abrasive resistant material.

The cab and crew cab floor areas will be covered with Polydamp™ acoustical floor mat consisting of a black pyramid rubber facing and closed cell foam decoupler.

The top surface of the material has a series of raised pyramid shapes evenly spaced, which offer a superior grip surface. Additionally, the material has a 0.25" thick closed cell foam (no water absorption) which offers a sound dampening material for reducing sound levels.

Page 310 ends

As Proposed 44 of 131 12-11-23

DEFROST/AIR CONDITIONING SYSTEM
A ceiling mounted combination heater, defroster and air conditioning system will be installed in the cab above the engine tunnel area.

Cab Defroster
A 54,000 BTU heater-defroster unit with 690 SCFM of air flow will be provided inside the cab. The heater-defrost will be installed in the forward portion of the cab ceiling. Air outlets will be strategically located in the cab header extrusion per the following:
 One (1) adjustable will be directed towards the left side cab window  One (1) adjustable will be directed towards the right side cab window  Six (6) fixed outlets will be directed at the windshield The defroster will be capable of clearing 98 percent of the windshield and side glass when tested under conditions where the cab has been cold soaked at 0 degrees Fahrenheit for 10 hours, and a 2 ounce per square inch layer of frost/ice has been able to build up on the exterior windshield. The defroster system will meet or exceed SAE J382 requirements.

Cab/Crew Auxiliary Heater
There will be no auxiliary heater provided in the rear facing seat risers.

Air Conditioning
A condenser will be a 59,644 BTU output that meets and exceeds the performance specification will be mounted on the radiator.

The air conditioning system will be capable of cooling the average cab temperature from 100 degrees Fahrenheit to 75 degrees Fahrenheit at 50 percent relative humidity within 30 minutes. The cooling performance test will be run only after the cab has been heat soaked at 100 degrees Fahrenheit for a minimum of 4 hours.

The evaporator unit will be installed in the rear portion of the cab ceiling over the engine tunnel. The evaporator will include one (1) high performance heating core, one (1) high performance cooling core with (1) plenum directed to the front and one (1) plenum directed to the rear of the cab. The rear plenum will be covered with a metal cover painted to match the cab interior.

The evaporator unit will have a 52,000 BTU at 690 SCFM rating that meets and exceeds the performance specifications.

Adjustable air outlets will be strategically located on the forward plenum cover per the following:
 Four (4) will be directed towards the seating position on the left side of the cab  Four (4) will be directed towards the seating position on the right side of the cab Adjustable air outlets will be strategically located on the rear plenum cover per the following:
 Minimum of five (5) will be directed towards crew cab area

Page 311 ends

As Proposed 45 of 131 12-11-23
A high efficiency particulate air (HEPA) filter will be included for the system. Access to the filter cover will be hinged with two (2) thumb latches.

The air conditioner refrigerant will be R-134A and will be installed by a certified technician.

Climate Control
An automotive style controller will be provided to control the heat and air conditioning system within the cab. The controller will have three (3) functional knobs for fan speed, temperature, and air flow distribution (front to rear) control.

The system will control the temperature of the cab and crew cab automatically by pushing the center of the fan speed control knob. Rotate the center temperature control knob to set the cab and crew cab temperature.

The AC system will be manually activated by pushing the center of the temperature control knob.

Pushing the center of the air flow distribution knob will engage the AC for max defrost, setting the fan speeds to 100 percent and directing all air flow to the overhead forward position.

The system controller will be located within panel position #12.

Gravity Drain Tubes
Two (2) condensate drain tubes will be provided for the air conditioning evaporator. The drip pan will have two (2) drain tubes plumbed separately to allow for the condensate to exit the drip pan. No pumps will be provided.

SUN VISORS
There will be two (2) vinyl covered sun visors provided. The sun visors will be located above the windshield with one (1) mounted on each side of the cab.

There will be a black plastic thumb latch provided to help secure each sun visor in the stowed position.

GRAB HANDLES
A black rubber covered grab handle will be mounted on the door post of the driver and officer's side cab door to assist in entering the cab. The grab handles will be securely mounted to the post area between the door and windshield.

ENGINE COMPARTMENT LIGHTS
There will be one (1) Whelen®, Model 3SC0CDCR, 12 volt DC, 3.00" white LED light(s) with Model 3FLANGEC, chrome flange kit(s) installed under the cab to be used as engine compartment illumination.

These light(s) will be activated automatically when the cab is raised or when the dip stick door is opened.

Page 312 ends

As Proposed 46 of 131 12-11-23

ACCESS TO ENGINE DIPSTICKS
For access to the engine oil and transmission fluid dipsticks, there will be a door on the engine tunnel, inside the crew cab. The door will be on the rear wall of the engine tunnel, on the vertical surface.

The engine oil dipstick will allow for checking only. The transmission dipstick will allow for both checking and filling.

The door will have a rubber seal for thermal and acoustic insulation. One (1) flush lift and turn latch with black finish will be provided on the access door.

VELCRO STRAP(S) FOR MAP BOX
There will be one (1) Velcro® strap(s) installed on the map box.

MAP BOX
A special map box with nine (9) bins, open from top, will be supplied and installed to be mounted at final. The map box will be 20.25" wide x 8.00" high (tapered down at sides and rear) and 23.25" front to back. The map box will be constructed of 0.125" aluminum and will be painted to match the cab interior.

SEATING CAPACITY
The seating capacity of the vehicle (including tiller cab and belted seat positions in the rescue body) will be six (6).

DRIVER SEAT
A seat will be provided in the cab for the driver. The seat design will be a cam action type, with air suspension. For increased convenience, the seat will include a manual control to adjust the horizontal position (6.00" travel). The manual horizontal control will be a towel-bar style located below the forward part of the seat cushion. To provide flexibility for multiple driver configurations, the seat will have an adjustable reclining back. The seat back will be a high back style with side bolster pads for maximum support. For optimal comfort, the seat will be provided with 17.00" deep foam cushions designed with EVC (elastomeric vibration control).

The seat will be furnished with a 3-point, shoulder type seat belt.

OFFICER SEAT
A seat will be provided in the cab for the passenger. The seat design will be a cam action type with air suspension. For increased convenience, the seat will be provided with 6.00" double locking fore/aft slide adjustment. The seat back will be a high back style with 9 degree fixed recline angle and side bolster pads for maximum support. For optimal comfort, the seat will be provided with 17.00" deep foam cushions designed with EVC (elastomeric vibration control).

The seat will be furnished with a 3-point, shoulder type seat belt.

REAR FACING DRIVER SIDE OUTBOARD SEAT
One (1) rear facing, Seats Incorporated 911 non-SCBA seat will be provided in the driver side outboard position in crew cab.

Page 313 ends

As Proposed 47 of 131 12-11-23

REAR FACING PASSENGER SIDE OUTBOARD SEAT
There will be one (1) rear facing, Seats Incorporated 911 high back seat provided at the passenger side outboard position in crew cab.

FORWARD FACING CENTER SEATS
There will be two (2) forward facing seats provided at the center position in the crew cab. For optimal comfort, the seats will be provided with 15.00" deep foam cushions designed with EVC (elastomeric vibration control).

The seat back will be an SCBA style with 90 degree back. The SCBA cavity will be adjustable from front to rear in 1.00" increments to accommodate different sized SCBA cylinders. Moving the SCBA cavity will be accomplished by unbolting, relocating, and re-bolting it in the desired location.

The seats will be furnished with a 3-point, shoulder type seat belt.

SEAT UPHOLSTERY
All seat upholstery will be black Turnout Tuff material.

AIR BOTTLE HOLDERS
All SCBA type seats in the cab will have a "Hands-Free" auto clamp style bracket in its backrest. For efficiency and convenience, the bracket will include an automatic spring clamp that allows the occupant to store the SCBA bottle by simply pushing it into the seat back. For protection of all occupants in the cab, in the event of an accident, the inertial components within the clamp will constrain the SCBA bottle in the seat and will exceed the NFPA standard of 9G.

There will be a quantity of two (2) SCBA brackets.

FOOT REST ANGLE
A knurled handrail type will be provided for the officers position. The handrail will be mounted to the engine housing with a flat stanchion and a "U" shaped bracket. The handrail will extend the width of the officers seat area. The foot rest will be positioned approximately 4.00" from the forward wall.

ACCESS DOOR
An access door will be provided in the front edge of each rear facing seat riser with a drop down door.

The drop down door will be provided with a Southco C2 black powder coated flush latch and painted to match the cab interior. There will be louvers provided on the door of the cabinet for ventilation.

SEAT BELTS
All cab and tiller cab (if applicable) seating positions will have red seat belts. To provide quick, easy use for occupants wearing bunker gear, the female buckle and seat belt webbing length will meet or exceed the current edition of applicable NFPA and CAN/ULC - S515 standards.

The 3-point shoulder type seat belts will include height adjustment. This adjustment will optimize the belts effectiveness and comfort for the seated firefighter. The 3-point shoulder type seat belts will be furnished with dual automatic retractors that will provide ease of operation in the normal seating position.

Page 314 ends

As Proposed 48 of 131 12-11-23
The 3-point shoulder type belts will also include the ReadyReach D-loop assembly to the shoulder belt system. The ReadyReach feature adds an extender arm to the D-loop location placing the D-loop in a closer, easier to reach location.

Any flip up seats will include a 3-point shoulder type belts only.

To ensure safe operation, the seats will be equipped with seat belt sensors in the seat cushion and belt receptacle that will activate an alarm indicating a seat is occupied but not buckled.

HELMET STORAGE PROVIDED BY FIRE DEPARTMENT
NFPA 1901, 2016 edition, section 14.1.7.4.1 requires a location for helmet storage be provided.

There is no helmet storage on the apparatus as manufactured. The fire department will provide a location for storage of helmets.

CAB DOME LIGHTS
There will be four (4) dual LED dome lights with black bezels provided. Two (2) lights will be mounted above the inside shoulder of the driver and officer and two (2) lights will be installed and located, one (1) on each side of the crew cab.

The color of the LED's will be red and white.

The white LED's will be controlled by the door switches and the lens switch.

The color LED's will be controlled by the lens switch.

In order to ensure exceptional illumination, each white LED dome light will provide a minimum of 10.1 foot-candles (fc) covering an entire 20.00" x 20.00" square seating position when mounted 40.00" above the seat.

ENHANCED SOFTWARE FOR CAB AND CREW CAB DOME LIGHTS
The cab and crew cab dome lights will remain on for 10 seconds for improved visibility after the doors are closed.

The dome lights will dim after 10 seconds or immediately if the vehicle's transmission is put into gear.

PORTABLE HAND LIGHTS, PROVIDED BY FIRE DEPARTMENT
NFPA 1901, 2016 edition, section 5.9.4 requires two portable hand lights mounted in brackets fastened to the apparatus.

The hand lights are not on the apparatus as manufactured. The fire department will provide and mount these hand lights.

CAB INSTRUMENTATION
The cab instrument panel will include gauges, an LCD display, telltale indicator lamps, control switches, alarms, and a diagnostic panel. The function of the instrument panel controls and switches will be identified by a label adjacent to each item. Actuation of the headlight switch will illuminate the labels

Page 315 ends

As Proposed 49 of 131 12-11-23
in low light conditions. Telltale indicator lamps will not be illuminated unless necessary. The cab instruments and controls will be conveniently located within the forward cab section, forward of the driver. The gauge assembly and switch panels are designed to be removable for ease of service and low cost of ownership.

Gauges
The gauge panel will include the following ten (10) ivory faced gauges with chrome bezels to monitor vehicle performance:
 Voltmeter gauge (volts):
o Low volts (11.8 VDC)
 Amber caution indicator on the information center with intermittent alarm  Amber caution light on gauge assembly
o High volts (15.5 VDC)
 Amber caution indicator on the information center with intermittent alarm  Amber caution light on gauge assembly
o Very low volts (11.3 VDC)
 Red warning indicator on the information center with a steady alarm  Amber caution light on gauge assembly
o Very high volts (16.0 VDC)
 Red warning indicator on the information center with a steady alarm  Amber caution light on gauge assembly
 Engine Tachometer (RPM)
 Speedometer MPH (Major Scale), KM/H (Minor Scale)
 Fuel level gauge (Empty - Full in fractions):
o Low fuel (1/8 full)
 Amber caution indicator on the information center with intermittent alarm  Amber caution light on gauge assembly
o Very low fuel (1/32 full)
 Red caution indicator on the information center with steady alarm  Amber caution light on gauge assembly
 Engine Oil pressure Gauge (PSI):
o Low oil pressure to activate engine warning lights and alarms  Red caution indicator on the information center with steady alarm  Amber caution light on gauge assembly
 Front Air Pressure Gauges (PSI):
o Low air pressure to activate warning lights and alarm  Red warning indicator on the information center with a steady alarm  Amber caution light on gauge assembly
 Rear Air Pressure Gauges (PSI):
o Low air pressure to activate warning lights and alarm  Red warning indicator on the information center with a steady alarm  Amber caution light on gauge assembly

Page 316 ends

As Proposed 50 of 131 12-11-23
 Transmission Oil Temperature Gauge (Fahrenheit):
o High transmission oil temperature activates warning lights and alarm  Amber caution indicator on the information center with intermittent alarm  Amber caution light on gauge assembly
 Engine Coolant Temperature Gauge (Fahrenheit):
o High engine temperature activates an engine warning light and alarms  Amber caution indicator on the information center with intermittent alarm  Amber caution light on gauge assembly
 Diesel Exhaust Fluid Level Gauge (Empty - Full in fractions):
o Low fluid (1/8 full)
 Amber indicator light in gauge dial
All gauges will perform prove out at initial power-up to ensure proper performance.

Indicator Lamps
To promote safety, the following telltale indicator lamps will be located on the instrument panel in clear view of the driver. The indicator lamps will be "dead-front" design that is only visible when active. The colored indicator lights will have descriptive text or symbols.

The following amber telltale lamps will be present:
 Low coolant
 Trac cntl (traction control) (where applicable
 Check engine
 Check trans (check transmission
 Aux brake overheat (Auxiliary brake overheat
 Air rest (air restriction)
 Caution (triangle symbol)
 Water in fuel
 DPF (engine diesel particulate filter regeneration)
 Trailer ABS (where applicable)
 Wait to start (where applicable)
 HET (engine high exhaust temperature) (where applicable)  ABS (antilock brake system)
 MIL (engine emissions system malfunction indicator lamp) (where applicable)  Side roll fault (where applicable)
 Front air bag fault (where applicable)
The following red telltale lamps will be present:
 Warning (stop sign symbol)
 Seat belt
 Parking brake
 Stop engine

Page 317 ends

As Proposed 51 of 131 12-11-23
 Rack down
The following green telltale lamps will be provided:
 Left turn
 Right turn
 Battery on
The following blue telltale lamp will be provided:
 High beam
Alarms
Audible steady tone warning alarm: A steady audible tone alarm will be provided whenever a warning message is present.

Audible pulsing tone caution alarm: A pulsing audible tone alarm (chime/chirp) will be provided whenever a caution message is present without a warning message being present.

Alarm silence: Any active audible alarm will be able to be silenced by holding the ignition switch at the top position for three (3) to five (5) seconds. For improved safety, silenced audible alarms will intermittently chirp every 30 seconds until the alarm condition no longer exists. The intermittent chirp will act as a reminder to the operator that a caution or warning condition still exists. Any new warning or caution condition will enable the steady or pulsing tones respectively.

Indicator Lamp and Alarm Prove-Out
A system will be provided which automatically tests telltale indicator lights and alarms located on the cab instrument panel. Telltale indicators and alarms will perform prove-out at initial power-up to ensure proper performance.

Control Switches
For ease of use, the following controls will be provided immediately adjacent to the cab instrument panel within easy reach of the driver. All switches will have backlit labels for low light applications.

Headlight/Parking light switch: A three (3)-position maintained rocker switch will be provided. The first switch position will deactivate all parking and headlights. The second switch position will activate the parking lights. The third switch will activate the headlights.

Panel back lighting intensity control switch: A three (3)-position momentary rocker switch will be provided. Pressing the top half of the switch, "Panel Up" increases the panel back lighting intensity and pressing the bottom half of the switch, "Panel Down" decreases the panel back lighting intensity.

Pressing the half or bottom half of the switch several times will allow back lighting intensity to be gradually varied from minimum to maximum intensity level for ease of use.

Ignition switch: A three (3)-position maintained/momentary rocker switch will be provided. The first switch position will turn off and deactivate vehicle ignition. The second switch position will activate

Page 318 ends

As Proposed 52 of 131 12-11-23
vehicle ignition and will perform prove-out on the telltale indicators and alarms for 3 to 5 seconds after the switch is turned on. A green indicator lamp is activated with vehicle ignition. The third momentary position will temporarily silence all active cab alarms. An alarm "chirp" may continue as long as alarm condition exists. Switching ignition to off position will terminate the alarm silence feature and reset function of cab alarm system.

Engine start switch: A two (2)-position momentary rocker switch will be provided. The first switch position is the default switch position. The second switch position will activate the vehicle's engine.

The switch actuator is designed to prevent accidental activation.

Hazard switch will be provided on the instrument panel or on the steering column.

Heater, defroster, and air conditioning control panel.

Windshield wiper control will include low, high and intermittent modes.

Turn signal arm: A self-canceling turn signal with high beam headlight will be provided.

Parking brake control: An air actuated push/pull park brake control valve will be provided.

Chassis horn control: Activation of the chassis horn control will be provided through the center of the steering wheel.

High idle engagement switch: A momentary rocker switch with integral indicator lamp will be provided.

The switch will activate and deactivate the high idle function. The "OK To Engage High Idle" indicator lamp must be active for the high idle function to engage. A green indicator lamp integral to the high idle engagement switch will indicate when the high idle function is engaged. "OK To Engage High Idle" indicator lamp: A green indicator light will be provided next to the high idle activation switch to indicate that the interlocks have been met to allow high idle engagement.

Emergency switching will be controlled by multiple individual warning light switches for various groups or areas of emergency warning lights. An Emergency Master switch provided on the instrument panel that enables or disables all individual warning light switches is included.

An additional "Emergency Master" button will be provided on the lower left hand corner of the gauge panel to allow convenient control of the "Emergency Master" system from inside the driver's door when standing on the ground.

Custom Switch Panels
The design of cab instrumentation will allow for emergency lighting and other switches to be placed within easy reach of the operator thus improving safety. There will be positions for up to four (4) switch panels in the lower instrument console and up to six (6) switch panels in the overhead visor console. All switches have backlit labels for low light conditions.

Page 319 ends

As Proposed 53 of 131 12-11-23
Diagnostic Panel
A diagnostic panel will be accessible while standing on the ground and located inside the driver's side door left of the steering column. The diagnostic panel will allow diagnostic tools such as computers to connect to various vehicle systems for improved troubleshooting providing a lower cost of ownership.

Diagnostic switches will allow ABS systems to provide blink codes should a problem exist.

The diagnostic panel will include the following:
 Engine diagnostic port
 Transmission diagnostic port
 ABS diagnostic port
 Roll sensor diagnostic port
 Command Zone USB diagnostic port
 ABS diagnostic switch (blink codes flashed on ABS telltale indicator)  Diesel particulate filter regeneration switch (where applicable)  Diesel particulate filter regeneration inhibit switch (where applicable) Cab LCD Display
A digital four (4)-row by 20-character dot matrix display will be integral to the gauge panel. The display will be capable of showing simple graphical images as well as text. The display will be split into three (3) sections. Each section will have a dedicated function. The upper left section will display the outside ambient temperature.

The upper right section will display the following, along with other configuration specific information:
 Odometer
 Trip mileage
 PTO hours
 Fuel consumption
 Engine hours
The bottom section will display INFO, CAUTION, and WARNING messages. Text messages will automatically activate to describe the cause of an audible caution or warning alarm. The LCD will be capable of displaying multiple text messages should more than one caution or warning condition exist.

AIR RESTRICTION INDICATOR
A high air restriction warning indicator light LCD message with amber warning indicator and audible alarm will be provided.
"DO NOT MOVE APPARATUS" INDICATOR
A Whelen, Model M2R flashing red indicator light with a chrome bezel, located in the driving compartment, will be illuminated automatically per the current NFPA requirements. The light will be labeled "Do Not Move Apparatus If Light Is On."

Page 320 ends

As Proposed 54 of 131 12-11-23
The same circuit that activates the Do Not Move Apparatus indicator will activate a steady tone alarm when the parking brake is released.

DO NOT MOVE TRUCK MESSAGES
Messages will be displayed on the Command Zone™, color display located within sight of the driver whenever the Do Not Move Truck light is active. The messages will designate the item or items not in the stowed for vehicle travel position (parking brake disengaged).

The following messages will be displayed (where applicable):
 Do Not Move Truck
 DS Cab Door Open (Driver Side Cab Door Open)
 PS Cab Door Open (Passenger's Side Cab Door Open)
 DS Crew Cab Door Open (Driver Side Crew Cab Door Open)  PS Crew Cab Door Open (Passenger's Side Crew Cab Door Open)  DS Body Door Open (Driver Side Body Door Open)
 PS Body Door Open (Passenger's Side Body Door Open)
 Rear Body Door Open
 DS Ladder Rack Down (Driver Side Ladder Rack Down)
 PS Ladder Rack Down (Passenger Side Ladder Rack Down)  Deck Gun Not Stowed
 Lt Tower Not Stowed (Light Tower Not Stowed)
 Fold Tank Not Stowed (Fold-A-Tank Not Stowed)
 Aerial Not Stowed (Aerial Device Not Stowed)
 Stabilizer Not Stowed
 Steps Not Stowed
 Handrail Not Stowed
Any other device that is opened, extended, or deployed that creates a hazard or is likely to cause major damage to the apparatus if the apparatus is moved will be displayed as a caution message after the parking brake is disengaged.

SWITCH PANELS
The emergency light switch panel will have a master switch for ease of use plus individual switches for selective control. Each switch panel will contain eight (8) membrane-type switches each rated for one million (1,000,000) cycles. Panels containing less than eight (8) switch assignments will include nonfunctioning black appliqués. The built-in switch panels will be located in the lower console or overhead console of the cab.

Additional switch panel(s) will be located in the overhead position(s) above the windshield or in designated locations on the lower instrument panel layout.

The switches will be membrane-type and also act as an integral indicator light. For quick, visual indication the entire surface of the switch will be illuminated white whenever back lighting is activated

Page 321 ends

As Proposed 55 of 131 12-11-23
and illuminated green whenever the switch is active. An active illuminated switch will flash when interlock requirements are not met or device is actively being load managed. For ease of use, a two (2)-ply, scratch resistant laser engraved Gravoply label indicating the use of each switch will be placed in the center of the switch. The label will allow light to pass through the letters for ease of use in low light conditions.

WIPER CONTROL
For simple operation and easy reach, the windshield wiper control will be an integral part of the directional light lever located on the steering column. The wiper control will include high and low wiper speed settings, an intermittent wiper control and windshield washer switch. The control will have a "return to park" provision, which allows the wipers to return to the stored position when not in use.

SPARE CIRCUIT
There will be four (4) pair of wires, including a positive and a negative, installed on the apparatus.

The above wires will have the following features:
 The positive wire will be connected directly to the battery power  The negative wire will be connected to ground
 Wires will be protected to 15 amps at 12 volts DC
 Power and ground will terminate officer side dash area, on the driver's side of the engine tunnel and on the rear area of the engine tunnel
 Termination will be with 15 amp, power point plug with rubber cover  Wires will be sized to 125 percent of the protection
The circuit(s) may be load managed when the parking brake is set.

SPARE CIRCUIT
There will be one (1) pair of wires, including a positive and a negative, installed on the apparatus.

The above wires will have the following features:

The positive wire will be connected directly to the battery power.

The negative wire will be connected to ground.

Wires will be protected to 30 amps at 12 volts DC.

Power and ground will terminate behind the officer seat.

Termination will be with a 10-place bus bar with screws and removable cover.

Wires will be sized to 125% of the protection.

This circuit(s) may be load managed when the parking brake is set.

Page 322 ends

As Proposed 56 of 131 12-11-23

RADIO, AM/FM/WB/USB/BT
There will be one (1) Aptiv, Heavy-Duty, AM/FM/WB with front panel USB port, integrated Blue Tooth.

FEATURES: Built-in Bluetooth® profile is selectable between Audio Streaming and/ or Hands-Free phone operation (utilizing the vehicle's audio system and a remote mic* - up to 10 devices can be easily stored in the radio memory for fast pairing) - FRONT PANEL USB PORT- gives a direct connect location for memory devices w/ USB interface, to play stored music and/or charge the device and have iPod® control through the radio - Back-lit Display Lighting - GREEN - PA Function (PA Microphone & Cable sold separately
The stereo radio will be mounted within reach of the officer.

The quantity and location of the speakers will be one (1) pair of 5.25" speakers in the cab and one (1) pair of 5.25" speakers in the crew cab.

The type and location of the antenna will be a roof-mounted rubber antenna located as far to the rear and centered side to side as possible, on the raised portion of the cab roof.

INFORMATION CENTER
An information center employing a 7.00" diagonal touch screen color LCD display will be encased in an ABS plastic housing.

The information center will have the following specifications:
 Operate in temperatures from -40 to 158 degrees Fahrenheit  LCD optically bonded to hardened AR glass lens
 Five weather resistant user interface switches
 Grey with black accents
 Sunlight Readable
 Linux operating system
 Minimum of 1000nits rated display
 Display can be changed to an available foreign language  A LCD display integral to the cab gauge panel will be included as outlined in the cab instrumentation area.
 Programmed to read US Customary
General Screen Design
Where possible, background colors will be used to provide "At a Glance" vehicle information. If information provided on a screen is within acceptable limits, a green background will be used.

If a caution or warning situation arises the following will occur:
 An amber background/text color will indicate a caution condition  A red background/text color will indicate a warning condition

Page 323 ends

As Proposed 57 of 131 12-11-23
 The information center will utilize an "Alert Center" to display text messages for audible alarm tones. The text messages will be written to identify the item(s) causing the audible alarm to sound. If more than one (1) text message occurs, the messages will cycle every second until the problem(s) have been resolved. The background color for the "Alert Center" will change to indicate the severity of the "warning" message. If a warning and a caution condition occur simultaneously, the red background color will be shown for all alert center messages.  A label for each button will exist. The label will indicate the function for each active button for each screen. Buttons that are not utilized on specific screens will have a button label with no text or symbol.

Home/Transit Screen
This screen will display the following:
 Vehicle Mitigation (if equipped)
 Water Level (if the water level system includes compatible communications to the information center)
 Foam Level (if the foam level system includes compatible communications to the information center)
 Seat Belt Monitoring Screen
 Tire Pressure Monitoring (if equipped)
 Digital Speedometer
 Active Alarms
On Scene Screen
This screen will display the following and will be auto activated with pump engaged (if equipped):
 Battery Voltage
 Fuel
 Oil Pressure
 Coolant Temperature
 RPM
 Water Level (if equipped)
 Foam Level (if equipped)
 Foam Concentration (if equipped)
 Water Flow Rate (if equipped)
 Water Used (if equipped)
 Active Alarms
Virtual Buttons
There will be four (4) virtual switch panel screens that match the overhead and lower lighting and HVAC switch panels.

Page 324 ends

As Proposed 58 of 131 12-11-23
Page Screen
The page screen will display the following and allow the user to progress into other screens for further functionality:
 Diagnostics
o Faults
 Listed by order of occurrence
 Allows to sort by system
o Interlock
 Throttle Interlocks
 Pump Interlocks (if equipped)
 Aerial Interlocks (if equipped)
 PTO Interlocks (if equipped)
o Load Manager
 A list of items to be load managed will be provided. The list will provide a description of the load.
 The lower the priority numbers the earlier the device will be shed should a low voltage condition occur.
 The screen will indicate if a load has been shed (disabled) or not shed.  "At a glance" color features are utilized on this screen. o Systems
 Command Zone
 Module type and ID number
 Module Version
 Input or output number
 Circuit number connected to that input or output
 Status of the input or output
 Power and Constant Current module diagnostic information  Foam (if equipped)
 Pressure Controller (if equipped)
 Generator Frequency (if equipped)
o Live Data
 General Truck Data
 Maintenance
o Engine oil and filter
o Transmission oil and filter
o Pump oil (if equipped)
o Foam (if equipped)
o Aerial (if equipped)
 Setup
o Clock Setup
o Date & Time

Page 325 ends

As Proposed 59 of 131 12-11-23
 12 or 24 hour format
 Set time and date
o Backlight
 Daytime
 Night time
 Sensitivity
o Unit Selection
o Home Screen
o Virtual Button Setup
o On Scene Screen Setup
o Configure Video Mode
 Set Video Contrast
 Set Video Color
 Set Video Tint
 Do Not Move
o The screen will indicate the approximate location and type of item that is open or is not stowed for travel. The actual status of the following devices will be indicated  Driver Side Cab Door
 Passenger's Side Cab Door
 Driver Side Crew Cab Door
 Passenger's Side Crew Cab Door
 Driver Side Body Doors
 Passenger's Side Body Doors
 Rear Body Door(s)
 Ladder Rack (if applicable)
 Deck Gun (if applicable)
 Light Tower (if applicable)
 Hatch Door (if applicable)
 Stabilizers (if applicable)
 Steps (if applicable)
 Notifications
o View Active Alarms
 Shows a list of all active alarms including date and time of the occurrence is shown with each alarm
 Silence Alarms - All alarms are silenced
 Timer Screen
 HVAC (if equipped)
 Tire Information (if equipped)
 Ascendant Set Up Confirmation (if equipped)
Button functions and button labels may change with each screen.

Page 326 ends

As Proposed 60 of 131 12-11-23

VEHICLE DATA RECORDER
There will be a vehicle data recorder (VDR) capable of reading and storing vehicle information provided.

The information stored on the VDR can be downloaded through a USB port mounted in a convenient location determined by cab model. A USB cable can be used to connect the VDR to a laptop to retrieve required information. The program to download the information from the VDR will be available to download on-line.

The vehicle data recorder will be capable of recording the following data via hardwired and/or CAN inputs:
 Vehicle Speed - MPH
 Acceleration - MPH/sec
 Deceleration - MPH/sec
 Engine Speed - RPM
 Engine Throttle Position - % of Full Throttle
 ABS Event - On/Off
 Seat Occupied Status - Yes/No by Position
 Seat Belt Buckled Status - Yes/No by Position
 Master Optical Warning Device Switch - On/Off
 Internal clock syncs the time and date when a laptop is connected.

Seat Belt Monitoring System
A seat belt monitoring system (SBMS) will be provided on the Command Zone™ color display. The SBMS will be capable of monitoring up to 10 seating positions indicating the status of each seat position per the following:
 Seat Occupied & Buckled = Green LED indicator illuminated  Seat Occupied & Unbuckled = Red LED indicator with audible alarm  No Occupant & Buckled = Red LED indicator with audible alarm  No Occupant & Unbuckled = No indicator and no alarm
The seat belt monitoring screen will become active on the Command Zone color display when:
 The home screen is active:
o and there is any occupant seated but not buckled or any belt buckled with an occupant. o and there are no other Do Not Move Apparatus conditions present. As soon as all Do Not Move Apparatus conditions are cleared, the SBMS will be activated.

The SBMS will include an audible alarm that will warn that an unbuckled occupant condition exists and the parking brake is released, or the transmission is not in park.

Page 327 ends
← All documents from this meeting