City of Fountain Valley FY 2025-2026 Fee Schedule
Title Unit Proposed Fee Current Fee
Title 18 Building Codes and Regulations

18.08.040 Hearing - Application fee $103.00 $100.00

18.26.010 Fees
Residential:

Residential PV system up to 15kW $450.00 $450.00
PV system above 15kW per kW $15 per kW $15 per kW
Commercial:

Commercial PV system up to 50kW $1,000.00 $1,000.00
PV System 51kW - 250kW per kW $7 per kW $7 per kW
PV System above 250kW per kW $5 per kW $5 per kW

18.34.060 Fees
Up to and including 2,000 sq. ft $25.75 $25.00
For each additional 1,000 sq. ft. or fraction thereof $4.60 $4.50

18.36.030 Fee Schedule
Residential 0.00021 times the estimated cost
of construction (minimum $0.50)

0.00021 times the estimated
cost of construction (minimum
$0.50)
Commercial 0.0001 times the estimated cost
of construction (minimum $0.50)

0.0001 times the estimated cost
of construction (minimum
$0.50)

BUILDING
Chapter 18.26 - Uniform Solar Energy Code
Chapter 18.34 - Paving Permits
Chapter 18.36 - Strong Motion Instrumentation Program
Chapter 18.08 - Relocation of Buildings
Effective October 20, 2025
36 EXHIBIT A

Page 176 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Project Description Proposed Flat Fee Current Flat Fee
1 REROOFING
Residential:

Composition & Bulk-up $206.00 $200.00
Wood & Metal & Built up $206.00 $200.00
Clay, Concrete, Metal (Sheet) $206.00 $200.00
Commercial (All Roofing Types):

Chimney/Fireplace Valuation Based Valuation Based
2 PLUMBING
Permit issuance fee $20.60 $20.00
Each plumbing fixture, dishwasher, disposal, water, heater, rain-water system (per drain), or for installation, alteration or repair of water piping, treatment, or softening equipment, sump pump.
$25.75 $25.00
Gas piping systems
1 to 5 outlets $25.75 $25.00
Each additional outlet $8.75 $8.50
Grease Interceptors, Septic, Storage, Or Large Capacity Clarifiers - Valuation
$129.75 $126.00
Cleanout $25.75 $25.00
Vacuum breakers $25.75 $25.00
Back flow preventer, includes valves $36.05 $35.00
Yard water distribution system, gas system, yard collector per $1,000.00 valuation
$25.75 $25.00
Gas regulators $25.75 $25.00
Connection to Public Sewer
Less than 50' piping $25.75 $25.00
50-250 linear ft. $36.05 $35.00
Sprinklers, Landscape
(when fee for complete system is not issued) $25.75 $25.00 additional for each riser and valve each $1.10 $1.10
Water Piping
U/G < 200 Lf Exterior $25.75 $25.00
Interior-Residential < 6,000 sq. ft. $25.75 $25.00
Commercial < 20,000 sq. ft. $25.75 $25.00
Repipes, Residential $25.75 $25.00
Plumbing plan check fees as a percentage of total unit fees as calculated above
65% of Permit Fee 65% of Permit Fee
Resident Unit SFD or MF $250.00 $250.00
Pools
P-Trap, Filters, Heater, Gas System, Gas Outlet, Backflow each $25.75 $25.00

BUILDING

BUILDING FEES - FLAT RATE FEES
Effective October 20, 2025
37 EXHIBIT A

Page 177 ends

City of Fountain Valley FY 2025-2026 Fee Schedule

BUILDING
3 MECHANICAL
Permit issuance fee $20.60 $20.00
AC Condensor $66.95 $65.00
Residential Furnace $82.40 $80.00
Commercial Equipment $0.00 $0.00
Package Air Conditioner, Roof Top, Heat Exchanger, Heat Pumps, Each $103.00 $100.00 VAVs, reheat, recool, auxiliary fans, additional duct installed conditioning systems
$20.60 $20.00
Boilers $61.80 $60.00
Refrigeration Equipment - Cooling towers, evaporative units, chillers $61.80 $60.00 Restaurant Hoods: 1-3 Per Address $87.55 $85.00
with make-up air and interlock $20.90 $20.90
Fans
Residential $20.60 $20.00
Commercial:

Exhaust Fan (bath type) $12.35 $12.00
Exhaust Fan-<750 CFMs $25.75 $25.00
750-4,000 CFMs $36.05 $35.00
4,100 and greater $56.65 $55.00
Repair, alteration, relocation or addition to each boiler or compressor or absorption system
Up to 5 H.P. or 100,000 BTU $77.25 $75.00
More than 5 H.P. or 100,000 BTU $123.60 $120.00
Registers, Grills, Outlets
This includes the ducting, support, and insulation required for each device each $8.20 $8.00
Mechanical plan check fees as a percentage of total unit fees as calculated above.
65% of Permit Fee 65% of Permit Fee
New Residential Unit SFD or MF $200.00 $200.00
4 ELECTRICAL UNIT
Permit Issuance fee $20.60 $20.00
General - Residential & Commercial
U/G Conduit per 100 ft. $25.75 $25.00
Grounding Rod & Grounding Electrode Only $25.75 $25.00
Sub Panels $51.50 $50.00
Luminaries, Outlets (120 amp), Switches - all types $5.15 $5.00 Over 50 luminaries reduce by 50% (include receptacles and switches over 50)
$2.55 $2.50
Fans (Bath Exhaust) $10.30 $10.00
Paddle Fans $25.75 $25.00
Pumps < 5 hph $25.75 $25.00
Multi outlet assemblies per 5 ft. $5.15 $5.00
Whole House Fans $32.55 $31.65
Specialty Circuits - Additions
Dryers, Ranges, Pumps, Jacuzzi tubs, new furnace location, AFCI circuits, A/C circuits, etc.
$25.75 $25.00

ALL WIRING IS INCLUDED IN DEVICE FEES
Pools
Motors, Outlets, Lights, Subpanel, Time Clock (each) $25.75 $25.00 Effective October 20, 2025
38 EXHIBIT A

Page 178 ends

City of Fountain Valley FY 2025-2026 Fee Schedule

BUILDING
Commercial
Generators < 80 kW including ATS $36.05 $35.00
Generators> 80 kW including ATS $41.20 $40.00
Diesel Generators<150 kW $46.35 $45.00
Diesel Generators>150 kW $61.80 $60.00
Transformers<150 kVA $46.35 $45.00
Transformers>150 kVA $69.00 $67.00
Switchgear per cabinet $103.00 $100.00
Photovoltaic Installation State Mandated
Residential:

Residential PV system up to 15kW $450.00 $450.00
PV system above 15kW per kW $15 per kW $15 per kW
Commercial:

Commercial PV system up to 50kW $1,000.00 $1,000.00
PV System 51kW - 250kW per kW $7 per kW $7 per kW
PV System above 250kW per kW $5 per kW $5 per kW
Special equip. inspection, for equip. based on hourly exempt from laboratory approval, at applicants request
Hourly Hourly
Electrical Plan Check Fees As A Percentage Of Total Unit Fees As Calculated Above
65% Of Permit Fee 65% Of Permit Fee
New and Panel Upgrade to 250 amp including bonding/grounding - Includes Services Panels, Switchgear, Battery Systems, Transformer, EV charger
each $82.40 $80.00
Panels 400 - 600 amps $77.25 $75.00
Panels 800 - 1000 amps $103.00 $100.00
Panels 1200 - 1600 amps $133.90 $130.00
Panels 2000 - 3000 amps $154.50 $150.00
Motor Control Centers
5 hp-24 Hp $20.60 $20.00
25-50 HP $32.55 $31.65
51-100 HP $42.60 $41.40
Bus ways, gutters, cable trays, etc. per 100' per 100' $25.75 $25.00 Garage, carport, de/attached on same serv. per 100 Sq Ft. - Avg. garage size is 400 sf
per 100 sq
ft
$6.65 $6.50
Relocated commercial building. Pre-lowering Building Inspection hourly rate
See table for fees See table for fees
Temporary Power
Per meter, with 1-3 distribution points & poles $83.40 $81.00 Each additional pole $6.15 $6.00
Each additional distribution point $7.20 $7.00
Piggyback $42.60 $41.40
New Residential Unit-SFD or MH $206.00 $200.00
OTHER STANDARD FEES (1)
Re-inspection $128.75 $125.00
Temporary certificate of occupancy-Application or Each Renewal each $77.25 $75.00 Change of ownership or contractor $25.75 $25.00
Revisions, changes, or additions to approved plans, extensive revisions, projects requiring private consultants & those not covered by this schedule will be charged based upon actual hours worked at the current hourly rate.
hourly
rate
$128.75 $125.00
Effective October 20, 2025
39 EXHIBIT A

Page 179 ends

City of Fountain Valley FY 2025-2026 Fee Schedule

BUILDING
Residential Remodel -
Does not include MEP fees
per sq ft Valuation-based
50% of the valuation
of new construction
Valuation-based
50% of the valuation
of new construction
Tenant Improvement (All Construction Types) -
Does not include MEP fees
per sq ft Valuation-based
50% of the valuation
of new construction
Valuation-based
50% of the valuation
of new construction
Residential Kitchen and Bathroom Remodel (non-structural remodel less than 300 sf of affected area) MEP not included
$334.75 $325.00
Construction Site (BMP) Inspection Fee (Commercial or Residential Projects) -
All projects disturbing 120 sf or more of earth. Block or retaining walls>20 lf, Swimming Pools& Spas, Exterior Plaster Work
Initial Inspection Fee
$154.50,
plus $77.25 for each
additional inspection
as required
Initial Inspection Fee
$150,
plus $75 for each
additional inspection
as required
Sign, Illuminated -
Electrical not included
Valuation Based Valuation Based
Sign, Non-illuminated Valuation Based Valuation Based
Windows, Doors, Skylights - Non-Structural Valuation Based Valuation Based Windows, Doors, Skylights - Structural Valuation Based Valuation Based Additional Plan Check and Rechecks in Excess of 3 per hour $128.75 $125.00 Plan Check/Permit Extension -
Valid request to extend plan check or permit
$36.05 $35.00
Plan Check Renewal 100% of Original Plan
Check Fee
100% of Original Plan
Check Fee
Building Permit Renewal 25% of Original
Building Permit Fee
(Final Inspection
Only)
25% of Original
Building Permit Fee
(Final Inspection
Only)
As-Built/After-the Fact Building Permit 2 x Calculated
Building Permit Fee
2 x Calculated
Building Permit Fee
Repetitive Plan Check 25% of Plan Check
Fee
25% of Plan Check Fee
Off-Hours Inspection Request per hour
(2 hour
minimum)
$128.75 $125.00
Swimming pool/spa replastering/nonstructural $267.80 $260.00 Demolitions SFR $437.75 $425.00
Effective October 20, 2025
40 EXHIBIT A

Page 180 ends

City of Fountain Valley FY 2025-2026 Fee Schedule

BUILDING
Grading Plan Check & Inspections
Small project: inc. plan check and permit $565.00 $565.00 Large project: Plan check hourly hourly $154.50 $150.00 Large project: Permit fee $300.00 $300.00
Change of Address $150.00 $150.00
Special Building Investigation Inspection time and
a half
after
hours
(min 3
hours)
$128.75 $125.00
Copy fees
Letter or legal $0.25 $0.25
11" x 17" $0.50 $0.50
Plans: (24" x 36") $2.25 $2.25
Plans: larger $3.00 $3.00
Permit Issuance Fee $20.60 $20.00
Geotechnical Review
Report Reviews:

Preliminary Review Residential $180.25 $175.00
Residential $875.50 $850.00
Commercial $1,236.00 $1,200.00
Rechecks Residential or Commercial $360.50 $350.00

MISCELLANEOUS FEE SCHEDULE
Effective October 20, 2025
41 EXHIBIT A

Page 181 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Project Description (Occupancy Group
and Types of Construction)
Per Sq. Ft. Project Description (Occupancy Group and Types of Construction)
Per Sq. Ft.
1 APARTMENT HOUSES (R-2) 19 NURSING HOME (I-2)
All Types of Construction ICC* Non-Residential ICC*
2 ASSISTED LIVING FACILITY(R-4) ICC* 20 OFFICE SPACE (B) ICC* 3 AUDITORIUMS (A-1) 21 RESTAURANTS (A2) ICC*
All Types of Construction ICC*
23 RETAIL STORES (M) ICC*
4 BANKS (B)
All Types of Construction ICC* 24 VOCATIONAL SCHOOLS ICC* 5 BOWLING ALLEYS (A-3) 25 SUPERMARKETS (M) ICC*
All Types of Construction ICC*
26 SWIMMING POOLS/SPAS
6 CHURCHES: (A-3 or B) New Based on Valuation
All Types of Construction ICC* Replastering/Non Structural $260.00 7 DWELLINGS: (R-3) 27 THEATRES (A) ICC*
All Types of Construction ICC*
Room Addition ICC* 28 WAREHOUSES/STORAGE (S-1, S-2) ICC* Residential Interior Remodel Only ICC*
29 DECK, WOOD Based on Valuation
30 GREEN HOUSES Based on Valuation
31 MASONRY WALLS
Block Based on Valuation
8 FIRE STATIONS (B) 32
All Types of Construction ICC*
Lightweight (No Ftng.) Based on Valuation
9 FUNERAL HOMES (B) ICC* Solid Cover (No Ftng.) Based on Valuation Lightweight (Ftng.) Based on Valuation
10 GARAGES, COMMERCIAL (S-1) ICC* Solid Cover (Ftng.) Based on Valuation Wood frame Based on Valuation
11 GARAGES, PARKING (S-2) ICC* mfg. (minimum $2,550 val.) Based on Valuation 12 HOMES FOR THE ELDERLY (R-4) 33 PLASTERING: (1) Based on Valuation All Types of Construction ICC*
34 RETAINING WALLS Based on Valuation
13 HOSPITALS (I-2)
All Types of Construction ICC* 35 COMMERCIAL ROOFING
Composition - Class A Based on Valuation
14 HOUSING, PUBLIC (R-2) Metal Based on Valuation
All Types of Construction ICC* Built Up Based on Valuation 15 LIBRARIES (B) 36 DEMOLITIONS: (1)
All Types of Construction ICC* SFR $425.00
Commercial Based on Valuation
16 MEDICAL CLINIC (B)
All Types of Construction ICC*
17 MEDICAL OFFICES (B)
All Types of Construction ICC*
18 MOTELS (R-1) *ICC Table is listed on the next page
All Types of Construction ICC* Project valuations is determined by the most recent published International Code Council (ICC) Building Valuation Table
*** Repeat plan checks submitted within 12
months of original, located within the same
tract, and using approved plans, will receive
a 75% discount on plan check fees.

RESIDENTIAL PATIO, STANDAR; COVERS, DECKS

BALCONIES, ENCLOSURES

BUILDING
Effective October 20, 2025
42 EXHIBIT A

Page 182 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Group (2024 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 337.41 325.40 315.80 303.35 283.46 275.24 292.98 264.14 254.04 A-1 Assembly, theaters, without stage 309.77 297.76 288.16 275.71 256.07 247.85 265.35 236.75 226.65 A-2 Assembly, nightclubs 269.42 261.52 253.31 243.65 228.21 222.01 235.29 207.53 199.66 A-2 Assembly, restaurants, bars, banquet halls 268.42 260.52 251.31 242.65 226.21 221.01 234.29 205.53 198.66 A-3 Assembly, churches 314.40 302.40 292.80 280.35 260.82 252.61 269.98 241.51 231.40 A-3 Assembly, general, community halls, libraries,museums 264.03 252.03 241.42 229.98 209.33 202.12 219.61 190.01 180.91 A-4 Assembly, arenas 308.77 296.76 286.16 274.71 254.07 246.85 264.35 234.75 225.65 B Business 298.43 287.83 277.50 265.76 242.70 234.06 255.55 216.90 206.96 E Educational 282.06 272.26 263.65 252.74 235.87 223.82 244.04 206.65 200.02 F-1 Factory and industrial, moderate hazard 164.17 156.25 146.41 140.89 125.45 119.36 134.33 104.02 96.87 F-2 Factory and industrial, low hazard 163.17 155.25 146.41 139.89 125.45 118.36 133.33 104.02 95.87 H-1 High Hazard, explosives 153.17 145.25 136.41 129.89 115.76 108.67 123.33 94.33 N.P.

H234 High Hazard 153.17 145.25 136.41 129.89 115.76 108.67 123.33 94.33 86.17 H-5 HPM 298.43 287.83 277.50 265.76 242.70 234.06 255.55 216.90 206.96 I-1 Institutional, supervised environment 274.98 265.13 255.66 246.00 225.17 219.12 245.49 202.80 195.56 I-2 Institutional, hospitals 469.18 458.58 448.25 436.51 411.45 N.P. 426.30 385.65 N.P.

I-2 Institutional, nursing homes 323.68 313.08 302.75 291.01 269.45 N.P. 280.80 243.65 N.P.

I-3 Institutional, restrained 314.93 304.33 294.00 282.26 261.70 252.06 272.05 255.55 223.96 I-4 Institutional, day care facilities 274.98 265.13 255.66 246.00 225.17 219.12 245.49 202.80 195.56 M Mercantile 201.08 193.18 183.97 175.31 159.52 154.32 166.95 138.84 131.97 R-1 Residential, hotels 278.14 268.29 258.82 249.16 227.83 221.78 248.64 205.46 198.22 R-2 Residential, multiple family 232.26 222.41 212.94 203.28 183.19 177.15 202.77 160.82 153.58 R-3 Residential, one- and two-family d 215.90 210.16 205.11 200.73 194.02 187.11 204.78 180.41 169.09 R-4 Residential, care/assisted living facilities 274.98 265.13 255.66 246.00 225.17 219.12 245.49 202.80 195.56 S-1 Storage, moderate hazard 152.17 144.25 134.41 128.89 113.76 107.67 122.33 92.33 85.17 S-2 Storage, low hazard 151.17 143.25 134.41 127.89 113.76 106.67 121.33 92.33 84.17 U Utility, miscellaneous 117.65 110.72 103.00 98.58 87.79 82.02 93.83 69.49 66.20 a. Private Garages use Utility, miscellaneous
b. For shell only buildings deduct 20 percent
c. N.P. = not permitted
d. Unfinished basements (Group R-3) = $31.50 per sq. ft.

Types of Construction (Definitions)
California Building Code Chapter 6 contains the requirements to classify buildings into one of five types of construction. Many code requirements applicable to a building, such as allowable height, allowable floor area, fire separation distances, building materials, etc. are dependent on its type of construction.

Types I and II construction are those types of construction in which the building elements (i.e., roof, walls, floors, and structural frame) are of noncombustible materials, except as specifically permitted in California Building Code Section 603 and elsewhere in the code.

Type III construction is that type of construction in which the exterior walls are of noncombustible materials and the interior building elements are of any material permitted by the code. Fire-retardant-treated wood framing is permitted within exterior wall assemblies of a 2-hour rating or less.

Type IV construction (Heavy Timber, HT) is that type of construction in which the exterior walls are of noncombustible materials and the interior building elements are of solid or laminated wood without concealed spaces. Minimum solid sawn nominal dimensions are required for structures built using Type IV construction (HT).

Type V construction is that type of construction in which the structural elements, exterior walls and interior walls are of any materials permitted by this code.

Construction Types I, II, III, IV and V are further subdivided into two categories, A and B, that identify differences in the degree of fire-resistance required.

BUILDING
ICC Building Valuation Table
Square Foot Construction Costs a, b, c
Building Valuation Data - February 2025
Effective October 20, 2025
43 EXHIBIT A

Page 183 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Minimum Value Maximum Value Base Rate Plus $$ For every

1.00 3,000.00 91.75 0.00 0.00
3,001.00 25,000.00 91.75 18.75 1,000.00
25,001.00 50,000.00 504.25 13.20 1,000.00
50,001.00 100,000.00 834.25 9.75 1,000.00
100,001.00 500,000.00 1,321.75 8.85 1,000.00
500,001.00 1,000,000.00 4,861.75 5.55 1,000.00
1,000,000.01 and up 7,636.75 2.15 1,000.00

BUILDING VALUATION FEE TABLE (BASED ON CONSTRUCTION VALUE) This Building Valuation Fee Table is used to calculate the inspection fee which, is then used to calculate the total (plan check and inspection) permit cost for valuation based permits. The cost of plan check is calculated by multiplying the cost of inspection by a factor of 0.65.

BUILDING
Effective October 20, 2025
44 EXHIBIT A

Page 184 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Up to $3,000.00 $59.64 $91.75 $20.60 $171.99
$3,001.00 to $4,000.00 $59.64 $91.75 $20.60 $171.99
$4,001.00 to $5,000.00 $71.83 $110.50 $20.60 $202.93
$5,001.00 to $6,000.00 $84.01 $129.25 $20.60 $233.86
$6,001.00 to $7,000.00 $96.20 $148.00 $20.60 $264.80
$7,001.00 to $8,000.00 $108.39 $166.75 $20.60 $295.74
$8,001.00 to $9,000.00 $120.58 $185.50 $20.60 $326.68
$9,001.00 to $10,000.00 $132.76 $204.25 $20.60 $357.61
$10,001.00 to $11,000.00 $144.95 $223.00 $20.60 $388.55 $11,001.00 to $12,000.00 $157.14 $241.75 $20.60 $419.49 $12,001.00 to $13,000.00 $169.33 $260.50 $20.60 $450.43 $13,001.00 to $14,000.00 $181.51 $279.25 $20.60 $481.36 $14,001.00 to $15,000.00 $193.70 $298.00 $20.60 $512.30 $15,001.00 to $16,000.00 $205.89 $316.75 $20.60 $543.24 $16,001.00 to $17,000.00 $218.08 $335.50 $20.60 $574.18 $17,001.00 to $18,000.00 $230.26 $354.25 $20.60 $605.11 $18,001.00 to $19,000.00 $242.45 $373.00 $20.60 $636.05 $19,001.00 to $20,000.00 $254.64 $391.75 $20.60 $666.99 $20,001.00 to $21,000.00 $266.83 $410.50 $20.60 $697.93 $21,001.00 to $22,000.00 $279.01 $429.25 $20.60 $728.86 $22,001.00 to $23,000.00 $291.20 $448.00 $20.60 $759.80 $23,001.00 to $24,000.00 $303.39 $466.75 $20.60 $790.74 $24,001.00 to $25,000.00 $315.58 $485.50 $20.60 $821.68 $25,001.00 to $26,000.00 $328.15 $504.85 $20.60 $853.60 $26,001.00 to $27,000.00 $336.73 $518.05 $20.60 $875.38 $27,001.00 to $28,000.00 $345.31 $531.25 $20.60 $897.16 $28,001.00 to $29,000.00 $353.89 $544.45 $20.60 $918.94 $29,001.00 to $30,000.00 $362.47 $557.65 $20.60 $940.72 $30,001.00 to $31,000.00 $371.05 $570.85 $20.60 $962.50 $31,001.00 to $32,000.00 $379.63 $584.05 $20.60 $984.28 $32,001.00 to $33,000.00 $388.21 $597.25 $20.60 $1,006.06 $33,001.00 to $34,000.00 $396.79 $610.45 $20.60 $1,027.84 $34,001.00 to $35,000.00 $405.37 $623.65 $20.60 $1,049.62 $35,001.00 to $36,000.00 $413.95 $636.85 $20.60 $1,071.40 $36,001.00 to $37,000.00 $422.53 $650.05 $20.60 $1,093.18 $37,001.00 to $38,000.00 $431.11 $663.25 $20.60 $1,114.96 $38,001.00 to $39,000.00 $439.69 $676.45 $20.60 $1,136.74 $39,001.00 to $40,000.00 $448.27 $689.65 $20.60 $1,158.52 $40,001.00 to $41,000.00 $456.85 $702.85 $20.60 $1,180.30 $41,001.00 to $42,000.00 $465.43 $716.05 $20.60 $1,202.08 $42,001.00 to $43,000.00 $474.01 $729.25 $20.60 $1,223.86 $43,001.00 to $44,000.00 $482.59 $742.45 $20.60 $1,245.64 $44,001.00 to $45,000.00 $491.17 $755.65 $20.60 $1,267.42 $45,001.00 to $46,000.00 $499.75 $768.85 $20.60 $1,289.20 $46,001.00 to $47,000.00 $508.33 $782.05 $20.60 $1,310.98 $47,001.00 to $48,000.00 $516.91 $795.25 $20.60 $1,332.76 $48,001.00 to $49,000.00 $525.49 $808.45 $20.60 $1,354.54 $49,001.00 to $50,000.00 $534.07 $821.65 $20.60 $1,376.32 $50,001.00 to $51,000.00 $543.40 $836.00 $20.60 $1,400.00 $51,001.00 to $52,000.00 $549.74 $845.75 $20.60 $1,416.09 $52,001.00 to $53,000.00 $556.08 $855.50 $20.60 $1,432.18 $53,001.00 to $54,000.00 $562.41 $865.25 $20.60 $1,448.26 $54,001.00 to $55,000.00 $568.75 $875.00 $20.60 $1,464.35 $55,001.00 to $56,000.00 $575.09 $884.75 $20.60 $1,480.44 $56,001.00 to $57,000.00 $581.43 $894.50 $20.60 $1,496.53 $57,001.00 to $58,000.00 $587.76 $904.25 $20.60 $1,512.61 $58,001.00 to $59,000.00 $594.10 $914.00 $20.60 $1,528.70 $59,001.00 to $60,000.00 $600.44 $923.75 $20.60 $1,544.79 $60,001.00 to $61,000.00 $606.78 $933.50 $20.60 $1,560.88 $61,001.00 to $62,000.00 $613.11 $943.25 $20.60 $1,576.96 $62,001.00 to $63,000.00 $619.45 $953.00 $20.60 $1,593.05 $63,001.00 to $64,000.00 $625.79 $962.75 $20.60 $1,609.14 $64,001.00 to $65,000.00 $632.13 $972.50 $20.60 $1,625.23 $65,001.00 to $66,000.00 $638.46 $982.25 $20.60 $1,641.31 $66,001.00 to $67,000.00 $644.80 $992.00 $20.60 $1,657.40 $67,001.00 to $68,000.00 $651.14 $1,001.75 $20.60 $1,673.49 $68,001.00 to $69,000.00 $657.48 $1,011.50 $20.60 $1,689.58 $69,001.00 to $70,000.00 $663.81 $1,021.25 $20.60 $1,705.66 $70,001.00 to $71,000.00 $670.15 $1,031.00 $20.60 $1,721.75 $71,001.00 to $72,000.00 $676.49 $1,040.75 $20.60 $1,737.84 $72,001.00 to $73,000.00 $682.83 $1,050.50 $20.60 $1,753.93 Total Valuation

BUILDING
Effective October 20, 2025
45 EXHIBIT A

Page 185 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$73,001.00 to $74,000.00 $689.16 $1,060.25 $20.60 $1,770.01 $74,001.00 to $75,000.00 $695.50 $1,070.00 $20.60 $1,786.10 $75,001.00 to $76,000.00 $701.84 $1,079.75 $20.60 $1,802.19 $76,001.00 to $77,000.00 $708.18 $1,089.50 $20.60 $1,818.28 $77,001.00 to $78,000.00 $714.51 $1,099.25 $20.60 $1,834.36 $78,001.00 to $79,000.00 $720.85 $1,109.00 $20.60 $1,850.45 $79,001.00 to $80,000.00 $727.19 $1,118.75 $20.60 $1,866.54 $80,001.00 to $81,000.00 $733.53 $1,128.50 $20.60 $1,882.63 $81,001.00 to $82,000.00 $739.86 $1,138.25 $20.60 $1,898.71 $82,001.00 to $83,000.00 $746.20 $1,148.00 $20.60 $1,914.80 $83,001.00 to $84,000.00 $752.54 $1,157.75 $20.60 $1,930.89 $84,001.00 to $85,000.00 $758.88 $1,167.50 $20.60 $1,946.98 $85,001.00 to $86,000.00 $765.21 $1,177.25 $20.60 $1,963.06 $86,001.00 to $87,000.00 $771.55 $1,187.00 $20.60 $1,979.15 $87,001.00 to $88,000.00 $777.89 $1,196.75 $20.60 $1,995.24 $88,001.00 to $89,000.00 $784.23 $1,206.50 $20.60 $2,011.33 $89,001.00 to $90,000.00 $790.56 $1,216.25 $20.60 $2,027.41 $90,001.00 to $91,000.00 $796.90 $1,226.00 $20.60 $2,043.50 $91,001.00 to $92,000.00 $803.24 $1,235.75 $20.60 $2,059.59 $92,001.00 to $93,000.00 $809.58 $1,245.50 $20.60 $2,075.68 $93,001.00 to $94,000.00 $815.91 $1,255.25 $20.60 $2,091.76 $94,001.00 to $95,000.00 $822.25 $1,265.00 $20.60 $2,107.85 $95,001.00 to $96,000.00 $828.59 $1,274.75 $20.60 $2,123.94 $96,001.00 to $97,000.00 $834.93 $1,284.50 $20.60 $2,140.03 $97,001.00 to $98,000.00 $841.26 $1,294.25 $20.60 $2,156.11 $98,001.00 to $99,000.00 $847.60 $1,304.00 $20.60 $2,172.20 $99,001.00 to $100,000.00 $853.94 $1,313.75 $20.60 $2,188.29 $100,001.00 to $101,000.00 $860.93 $1,324.50 $20.60 $2,206.03 $101,001.00 to $102,000.00 $866.68 $1,333.35 $20.60 $2,220.63 $102,001.00 to $103,000.00 $872.43 $1,342.20 $20.60 $2,235.23 $103,001.00 to $104,000.00 $878.18 $1,351.05 $20.60 $2,249.83 $104,001.00 to $105,000.00 $883.94 $1,359.90 $20.60 $2,264.44 $105,001.00 to $106,000.00 $889.69 $1,368.75 $20.60 $2,279.04 $106,001.00 to $107,000.00 $895.44 $1,377.60 $20.60 $2,293.64 $107,001.00 to $108,000.00 $901.19 $1,386.45 $20.60 $2,308.24 $108,001.00 to $109,000.00 $906.95 $1,395.30 $20.60 $2,322.85 $109,001.00 to $110,000.00 $912.70 $1,404.15 $20.60 $2,337.45 $110,001.00 to $111,000.00 $918.45 $1,413.00 $20.60 $2,352.05 $111,001.00 to $112,000.00 $924.20 $1,421.85 $20.60 $2,366.65 $112,001.00 to $113,000.00 $929.95 $1,430.70 $20.60 $2,381.26 $113,001.00 to $114,000.00 $935.71 $1,439.55 $20.60 $2,395.86 $114,001.00 to $115,000.00 $941.46 $1,448.40 $20.60 $2,410.46 $115,001.00 to $116,000.00 $947.21 $1,457.25 $20.60 $2,425.06 $116,001.00 to $117,000.00 $952.96 $1,466.10 $20.60 $2,439.67 $117,001.00 to $118,000.00 $958.72 $1,474.95 $20.60 $2,454.27 $118,001.00 to $119,000.00 $964.47 $1,483.80 $20.60 $2,468.87 $119,001.00 to $120,000.00 $970.22 $1,492.65 $20.60 $2,483.47 $120,001.00 to $121,000.00 $975.97 $1,501.50 $20.60 $2,498.08 $121,001.00 to $122,000.00 $981.73 $1,510.35 $20.60 $2,512.68 $122,001.00 to $123,000.00 $987.48 $1,519.20 $20.60 $2,527.28 $123,001.00 to $124,000.00 $993.23 $1,528.05 $20.60 $2,541.88 $124,001.00 to $125,000.00 $998.98 $1,536.90 $20.60 $2,556.49 $125,001.00 to $126,000.00 $1,004.74 $1,545.75 $20.60 $2,571.09 $126,001.00 to $127,000.00 $1,010.49 $1,554.60 $20.60 $2,585.69 $127,001.00 to $128,000.00 $1,016.24 $1,563.45 $20.60 $2,600.29 $128,001.00 to $129,000.00 $1,022.00 $1,572.30 $20.60 $2,614.90 $129,001.00 to $130,000.00 $1,027.75 $1,581.15 $20.60 $2,629.50 $130,001.00 to $131,000.00 $1,033.50 $1,590.00 $20.60 $2,644.10 $131,001.00 to $132,000.00 $1,039.25 $1,598.85 $20.60 $2,658.70 $132,001.00 to $133,000.00 $1,045.01 $1,607.70 $20.60 $2,673.31 $133,001.00 to $134,000.00 $1,050.76 $1,616.55 $20.60 $2,687.91 $134,001.00 to $135,000.00 $1,056.51 $1,625.40 $20.60 $2,702.51 $135,001.00 to $136,000.00 $1,062.26 $1,634.25 $20.60 $2,717.11 $136,001.00 to $137,000.00 $1,068.02 $1,643.10 $20.60 $2,731.71 $137,001.00 to $138,000.00 $1,073.77 $1,651.95 $20.60 $2,746.32 $138,001.00 to $139,000.00 $1,079.52 $1,660.80 $20.60 $2,760.92 $139,001.00 to $140,000.00 $1,085.27 $1,669.65 $20.60 $2,775.52 $140,001.00 to $141,000.00 $1,091.03 $1,678.50 $20.60 $2,790.12 $141,001.00 to $142,000.00 $1,096.78 $1,687.35 $20.60 $2,804.73 $142,001.00 to $143,000.00 $1,102.53 $1,696.20 $20.60 $2,819.33 $143,001.00 to $144,000.00 $1,108.28 $1,705.05 $20.60 $2,833.93 Effective October 20, 2025
46 EXHIBIT A

Page 186 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$144,001.00 to $145,000.00 $1,114.04 $1,713.90 $20.60 $2,848.53 $145,001.00 to $146,000.00 $1,119.79 $1,722.75 $20.60 $2,863.14 $146,001.00 to $147,000.00 $1,125.54 $1,731.60 $20.60 $2,877.74 $147,001.00 to $148,000.00 $1,131.29 $1,740.45 $20.60 $2,892.34 $148,001.00 to $149,000.00 $1,137.05 $1,749.30 $20.60 $2,906.94 $149,001.00 to $150,000.00 $1,142.80 $1,758.15 $20.60 $2,921.55 $150,001.00 to $151,000.00 $1,148.55 $1,767.00 $20.60 $2,936.15 $151,001.00 to $152,000.00 $1,154.30 $1,775.85 $20.60 $2,950.75 $152,001.00 to $153,000.00 $1,160.06 $1,784.70 $20.60 $2,965.35 $153,001.00 to $154,000.00 $1,165.81 $1,793.55 $20.60 $2,979.96 $154,001.00 to $155,000.00 $1,171.56 $1,802.40 $20.60 $2,994.56 $155,001.00 to $156,000.00 $1,177.31 $1,811.25 $20.60 $3,009.16 $156,001.00 to $157,000.00 $1,183.07 $1,820.10 $20.60 $3,023.76 $157,001.00 to $158,000.00 $1,188.82 $1,828.95 $20.60 $3,038.37 $158,001.00 to $159,000.00 $1,194.57 $1,837.80 $20.60 $3,052.97 $159,001.00 to $160,000.00 $1,200.32 $1,846.65 $20.60 $3,067.57 $160,001.00 to $161,000.00 $1,206.08 $1,855.50 $20.60 $3,082.17 $161,001.00 to $162,000.00 $1,211.83 $1,864.35 $20.60 $3,096.78 $162,001.00 to $163,000.00 $1,217.58 $1,873.20 $20.60 $3,111.38 $163,001.00 to $164,000.00 $1,223.33 $1,882.05 $20.60 $3,125.98 $164,001.00 to $165,000.00 $1,229.09 $1,890.90 $20.60 $3,140.58 $165,001.00 to $166,000.00 $1,234.84 $1,899.75 $20.60 $3,155.19 $166,001.00 to $167,000.00 $1,240.59 $1,908.60 $20.60 $3,169.79 $167,001.00 to $168,000.00 $1,246.34 $1,917.45 $20.60 $3,184.39 $168,001.00 to $169,000.00 $1,252.10 $1,926.30 $20.60 $3,198.99 $169,001.00 to $170,000.00 $1,257.85 $1,935.15 $20.60 $3,213.60 $170,001.00 to $171,000.00 $1,263.60 $1,944.00 $20.60 $3,228.20 $171,001.00 to $172,000.00 $1,269.35 $1,952.85 $20.60 $3,242.80 $172,001.00 to $173,000.00 $1,275.11 $1,961.70 $20.60 $3,257.40 $173,001.00 to $174,000.00 $1,280.86 $1,970.55 $20.60 $3,272.01 $174,001.00 to $175,000.00 $1,286.61 $1,979.40 $20.60 $3,286.61 $175,001.00 to $176,000.00 $1,292.36 $1,988.25 $20.60 $3,301.21 $176,001.00 to $177,000.00 $1,298.12 $1,997.10 $20.60 $3,315.81 $177,001.00 to $178,000.00 $1,303.87 $2,005.95 $20.60 $3,330.42 $178,001.00 to $179,000.00 $1,309.62 $2,014.80 $20.60 $3,345.02 $179,001.00 to $180,000.00 $1,315.37 $2,023.65 $20.60 $3,359.62 $180,001.00 to $181,000.00 $1,321.13 $2,032.50 $20.60 $3,374.22 $181,001.00 to $182,000.00 $1,326.88 $2,041.35 $20.60 $3,388.83 $182,001.00 to $183,000.00 $1,332.63 $2,050.20 $20.60 $3,403.43 $183,001.00 to $184,000.00 $1,338.38 $2,059.05 $20.60 $3,418.03 $184,001.00 to $185,000.00 $1,344.13 $2,067.90 $20.60 $3,432.63 $185,001.00 to $186,000.00 $1,349.89 $2,076.75 $20.60 $3,447.24 $186,001.00 to $187,000.00 $1,355.64 $2,085.60 $20.60 $3,461.84 $187,001.00 to $188,000.00 $1,361.39 $2,094.45 $20.60 $3,476.44 $188,001.00 to $189,000.00 $1,367.14 $2,103.30 $20.60 $3,491.04 $189,001.00 to $190,000.00 $1,372.90 $2,112.15 $20.60 $3,505.65 $190,001.00 to $191,000.00 $1,378.65 $2,121.00 $20.60 $3,520.25 $191,001.00 to $192,000.00 $1,384.40 $2,129.85 $20.60 $3,534.85 $192,001.00 to $193,000.00 $1,390.15 $2,138.70 $20.60 $3,549.45 $193,001.00 to $194,000.00 $1,395.91 $2,147.55 $20.60 $3,564.06 $194,001.00 to $195,000.00 $1,401.66 $2,156.40 $20.60 $3,578.66 $195,001.00 to $196,000.00 $1,407.41 $2,165.25 $20.60 $3,593.26 $196,001.00 to $197,000.00 $1,413.16 $2,174.10 $20.60 $3,607.86 $197,001.00 to $198,000.00 $1,418.92 $2,182.95 $20.60 $3,622.47 $198,001.00 to $199,000.00 $1,424.67 $2,191.80 $20.60 $3,637.07 $199,001.00 to $200,000.00 $1,430.42 $2,200.65 $20.60 $3,651.67 $200,001.00 to $201,000.00 $1,436.17 $2,209.50 $20.60 $3,666.27 $201,001.00 to $202,000.00 $1,441.93 $2,218.35 $20.60 $3,680.88 $202,001.00 to $203,000.00 $1,447.68 $2,227.20 $20.60 $3,695.48 $203,001.00 to $204,000.00 $1,453.43 $2,236.05 $20.60 $3,710.08 $204,001.00 to $205,000.00 $1,459.18 $2,244.90 $20.60 $3,724.68 $205,001.00 to $206,000.00 $1,464.94 $2,253.75 $20.60 $3,739.29 $206,001.00 to $207,000.00 $1,470.69 $2,262.60 $20.60 $3,753.89 $207,001.00 to $208,000.00 $1,476.44 $2,271.45 $20.60 $3,768.49 $208,001.00 to $209,000.00 $1,482.19 $2,280.30 $20.60 $3,783.09 $209,001.00 to $210,000.00 $1,487.95 $2,289.15 $20.60 $3,797.70 $210,001.00 to $211,000.00 $1,493.70 $2,298.00 $20.60 $3,812.30 $211,001.00 to $212,000.00 $1,499.45 $2,306.85 $20.60 $3,826.90 $212,001.00 to $213,000.00 $1,505.20 $2,315.70 $20.60 $3,841.50 $213,001.00 to $214,000.00 $1,510.96 $2,324.55 $20.60 $3,856.11 $214,001.00 to $215,000.00 $1,516.71 $2,333.40 $20.60 $3,870.71 Effective October 20, 2025
47 EXHIBIT A

Page 187 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$215,001.00 to $216,000.00 $1,522.46 $2,342.25 $20.60 $3,885.31 $216,001.00 to $217,000.00 $1,528.21 $2,351.10 $20.60 $3,899.91 $217,001.00 to $218,000.00 $1,533.97 $2,359.95 $20.60 $3,914.52 $218,001.00 to $219,000.00 $1,539.72 $2,368.80 $20.60 $3,929.12 $219,001.00 to $220,000.00 $1,545.47 $2,377.65 $20.60 $3,943.72 $220,001.00 to $221,000.00 $1,551.22 $2,386.50 $20.60 $3,958.32 $221,001.00 to $222,000.00 $1,556.98 $2,395.35 $20.60 $3,972.93 $222,001.00 to $223,000.00 $1,562.73 $2,404.20 $20.60 $3,987.53 $223,001.00 to $224,000.00 $1,568.48 $2,413.05 $20.60 $4,002.13 $224,001.00 to $225,000.00 $1,574.23 $2,421.90 $20.60 $4,016.73 $225,001.00 to $226,000.00 $1,579.99 $2,430.75 $20.60 $4,031.34 $226,001.00 to $227,000.00 $1,585.74 $2,439.60 $20.60 $4,045.94 $227,001.00 to $228,000.00 $1,591.49 $2,448.45 $20.60 $4,060.54 $228,001.00 to $229,000.00 $1,597.24 $2,457.30 $20.60 $4,075.14 $229,001.00 to $230,000.00 $1,603.00 $2,466.15 $20.60 $4,089.75 $230,001.00 to $231,000.00 $1,608.75 $2,475.00 $20.60 $4,104.35 $231,001.00 to $232,000.00 $1,614.50 $2,483.85 $20.60 $4,118.95 $232,001.00 to $233,000.00 $1,620.25 $2,492.70 $20.60 $4,133.55 $233,001.00 to $234,000.00 $1,626.01 $2,501.55 $20.60 $4,148.16 $234,001.00 to $235,000.00 $1,631.76 $2,510.40 $20.60 $4,162.76 $235,001.00 to $236,000.00 $1,637.51 $2,519.25 $20.60 $4,177.36 $236,001.00 to $237,000.00 $1,643.26 $2,528.10 $20.60 $4,191.96 $237,001.00 to $238,000.00 $1,649.02 $2,536.95 $20.60 $4,206.57 $238,001.00 to $239,000.00 $1,654.77 $2,545.80 $20.60 $4,221.17 $239,001.00 to $240,000.00 $1,660.52 $2,554.65 $20.60 $4,235.77 $240,001.00 to $241,000.00 $1,666.27 $2,563.50 $20.60 $4,250.37 $241,001.00 to $242,000.00 $1,672.03 $2,572.35 $20.60 $4,264.98 $242,001.00 to $243,000.00 $1,677.78 $2,581.20 $20.60 $4,279.58 $243,001.00 to $244,000.00 $1,683.53 $2,590.05 $20.60 $4,294.18 $244,001.00 to $245,000.00 $1,689.28 $2,598.90 $20.60 $4,308.78 $245,001.00 to $246,000.00 $1,695.04 $2,607.75 $20.60 $4,323.39 $246,001.00 to $247,000.00 $1,700.79 $2,616.60 $20.60 $4,337.99 $247,001.00 to $248,000.00 $1,706.54 $2,625.45 $20.60 $4,352.59 $248,001.00 to $249,000.00 $1,712.29 $2,634.30 $20.60 $4,367.19 $249,001.00 to $250,000.00 $1,718.05 $2,643.15 $20.60 $4,381.80 $250,001.00 to $251,000.00 $1,723.80 $2,652.00 $20.60 $4,396.40 $251,001.00 to $252,000.00 $1,729.55 $2,660.85 $20.60 $4,411.00 $252,001.00 to $253,000.00 $1,735.30 $2,669.70 $20.60 $4,425.60 $253,001.00 to $254,000.00 $1,741.06 $2,678.55 $20.60 $4,440.21 $254,001.00 to $255,000.00 $1,746.81 $2,687.40 $20.60 $4,454.81 $255,001.00 to $256,000.00 $1,752.56 $2,696.25 $20.60 $4,469.41 $256,001.00 to $257,000.00 $1,758.31 $2,705.10 $20.60 $4,484.01 $257,001.00 to $258,000.00 $1,764.07 $2,713.95 $20.60 $4,498.62 $258,001.00 to $259,000.00 $1,769.82 $2,722.80 $20.60 $4,513.22 $259,001.00 to $260,000.00 $1,775.57 $2,731.65 $20.60 $4,527.82 $260,001.00 to $261,000.00 $1,781.32 $2,740.50 $20.60 $4,542.42 $261,001.00 to $262,000.00 $1,787.08 $2,749.35 $20.60 $4,557.03 $262,001.00 to $263,000.00 $1,792.83 $2,758.20 $20.60 $4,571.63 $263,001.00 to $264,000.00 $1,798.58 $2,767.05 $20.60 $4,586.23 $264,001.00 to $265,000.00 $1,804.33 $2,775.90 $20.60 $4,600.83 $265,001.00 to $266,000.00 $1,810.09 $2,784.75 $20.60 $4,615.44 $266,001.00 to $267,000.00 $1,815.84 $2,793.60 $20.60 $4,630.04 $267,001.00 to $268,000.00 $1,821.59 $2,802.45 $20.60 $4,644.64 $268,001.00 to $269,000.00 $1,827.34 $2,811.30 $20.60 $4,659.24 $269,001.00 to $270,000.00 $1,833.10 $2,820.15 $20.60 $4,673.85 $270,001.00 to $271,000.00 $1,838.85 $2,829.00 $20.60 $4,688.45 $271,001.00 to $272,000.00 $1,844.60 $2,837.85 $20.60 $4,703.05 $272,001.00 to $273,000.00 $1,850.35 $2,846.70 $20.60 $4,717.65 $273,001.00 to $274,000.00 $1,856.11 $2,855.55 $20.60 $4,732.26 $274,001.00 to $275,000.00 $1,861.86 $2,864.40 $20.60 $4,746.86 $275,001.00 to $276,000.00 $1,867.61 $2,873.25 $20.60 $4,761.46 $276,001.00 to $277,000.00 $1,873.36 $2,882.10 $20.60 $4,776.06 $277,001.00 to $278,000.00 $1,879.12 $2,890.95 $20.60 $4,790.67 $278,001.00 to $279,000.00 $1,884.87 $2,899.80 $20.60 $4,805.27 $279,001.00 to $280,000.00 $1,890.62 $2,908.65 $20.60 $4,819.87 $280,001.00 to $281,000.00 $1,896.37 $2,917.50 $20.60 $4,834.47 $281,001.00 to $282,000.00 $1,902.13 $2,926.35 $20.60 $4,849.08 $282,001.00 to $283,000.00 $1,907.88 $2,935.20 $20.60 $4,863.68 $283,001.00 to $284,000.00 $1,913.63 $2,944.05 $20.60 $4,878.28 $284,001.00 to $285,000.00 $1,919.38 $2,952.90 $20.60 $4,892.88 $285,001.00 to $286,000.00 $1,925.14 $2,961.75 $20.60 $4,907.49 Effective October 20, 2025
48 EXHIBIT A

Page 188 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$286,001.00 to $287,000.00 $1,930.89 $2,970.60 $20.60 $4,922.09 $287,001.00 to $288,000.00 $1,936.64 $2,979.45 $20.60 $4,936.69 $288,001.00 to $289,000.00 $1,942.39 $2,988.30 $20.60 $4,951.29 $289,001.00 to $290,000.00 $1,948.15 $2,997.15 $20.60 $4,965.90 $290,001.00 to $291,000.00 $1,953.90 $3,006.00 $20.60 $4,980.50 $291,001.00 to $292,000.00 $1,959.65 $3,014.85 $20.60 $4,995.10 $292,001.00 to $293,000.00 $1,965.40 $3,023.70 $20.60 $5,009.70 $293,001.00 to $294,000.00 $1,971.16 $3,032.55 $20.60 $5,024.31 $294,001.00 to $295,000.00 $1,976.91 $3,041.40 $20.60 $5,038.91 $295,001.00 to $296,000.00 $1,982.66 $3,050.25 $20.60 $5,053.51 $296,001.00 to $297,000.00 $1,988.41 $3,059.10 $20.60 $5,068.11 $297,001.00 to $298,000.00 $1,994.17 $3,067.95 $20.60 $5,082.72 $298,001.00 to $299,000.00 $1,999.92 $3,076.80 $20.60 $5,097.32 $299,001.00 to $300,000.00 $2,005.67 $3,085.65 $20.60 $5,111.92 $300,001.00 to $301,000.00 $2,011.42 $3,094.50 $20.60 $5,126.52 $301,001.00 to $302,000.00 $2,017.18 $3,103.35 $20.60 $5,141.13 $302,001.00 to $303,000.00 $2,022.93 $3,112.20 $20.60 $5,155.73 $303,001.00 to $304,000.00 $2,028.68 $3,121.05 $20.60 $5,170.33 $304,001.00 to $305,000.00 $2,034.43 $3,129.90 $20.60 $5,184.93 $305,001.00 to $306,000.00 $2,040.19 $3,138.75 $20.60 $5,199.54 $306,001.00 to $307,000.00 $2,045.94 $3,147.60 $20.60 $5,214.14 $307,001.00 to $308,000.00 $2,051.69 $3,156.45 $20.60 $5,228.74 $308,001.00 to $309,000.00 $2,057.44 $3,165.30 $20.60 $5,243.34 $309,001.00 to $310,000.00 $2,063.20 $3,174.15 $20.60 $5,257.95 $310,001.00 to $311,000.00 $2,068.95 $3,183.00 $20.60 $5,272.55 $311,001.00 to $312,000.00 $2,074.70 $3,191.85 $20.60 $5,287.15 $312,001.00 to $313,000.00 $2,080.45 $3,200.70 $20.60 $5,301.75 $313,001.00 to $314,000.00 $2,086.21 $3,209.55 $20.60 $5,316.36 $314,001.00 to $315,000.00 $2,091.96 $3,218.40 $20.60 $5,330.96 $315,001.00 to $316,000.00 $2,097.71 $3,227.25 $20.60 $5,345.56 $316,001.00 to $317,000.00 $2,103.46 $3,236.10 $20.60 $5,360.16 $317,001.00 to $318,000.00 $2,109.22 $3,244.95 $20.60 $5,374.77 $318,001.00 to $319,000.00 $2,114.97 $3,253.80 $20.60 $5,389.37 $319,001.00 to $320,000.00 $2,120.72 $3,262.65 $20.60 $5,403.97 $320,001.00 to $321,000.00 $2,126.47 $3,271.50 $20.60 $5,418.57 $321,001.00 to $322,000.00 $2,132.23 $3,280.35 $20.60 $5,433.18 $322,001.00 to $323,000.00 $2,137.98 $3,289.20 $20.60 $5,447.78 $323,001.00 to $324,000.00 $2,143.73 $3,298.05 $20.60 $5,462.38 $324,001.00 to $325,000.00 $2,149.48 $3,306.90 $20.60 $5,476.98 $325,001.00 to $326,000.00 $2,155.24 $3,315.75 $20.60 $5,491.59 $326,001.00 to $327,000.00 $2,160.99 $3,324.60 $20.60 $5,506.19 $327,001.00 to $328,000.00 $2,166.74 $3,333.45 $20.60 $5,520.79 $328,001.00 to $329,000.00 $2,172.49 $3,342.30 $20.60 $5,535.39 $329,001.00 to $330,000.00 $2,178.25 $3,351.15 $20.60 $5,550.00 $330,001.00 to $331,000.00 $2,184.00 $3,360.00 $20.60 $5,564.60 $331,001.00 to $332,000.00 $2,189.75 $3,368.85 $20.60 $5,579.20 $332,001.00 to $333,000.00 $2,195.50 $3,377.70 $20.60 $5,593.80 $333,001.00 to $334,000.00 $2,201.26 $3,386.55 $20.60 $5,608.41 $334,001.00 to $335,000.00 $2,207.01 $3,395.40 $20.60 $5,623.01 $335,001.00 to $336,000.00 $2,212.76 $3,404.25 $20.60 $5,637.61 $336,001.00 to $337,000.00 $2,218.51 $3,413.10 $20.60 $5,652.21 $337,001.00 to $338,000.00 $2,224.27 $3,421.95 $20.60 $5,666.82 $338,001.00 to $339,000.00 $2,230.02 $3,430.80 $20.60 $5,681.42 $339,001.00 to $340,000.00 $2,235.77 $3,439.65 $20.60 $5,696.02 $340,001.00 to $341,000.00 $2,241.52 $3,448.50 $20.60 $5,710.62 $341,001.00 to $342,000.00 $2,247.28 $3,457.35 $20.60 $5,725.23 $342,001.00 to $343,000.00 $2,253.03 $3,466.20 $20.60 $5,739.83 $343,001.00 to $344,000.00 $2,258.78 $3,475.05 $20.60 $5,754.43 $344,001.00 to $345,000.00 $2,264.53 $3,483.90 $20.60 $5,769.03 $345,001.00 to $346,000.00 $2,270.29 $3,492.75 $20.60 $5,783.64 $346,001.00 to $347,000.00 $2,276.04 $3,501.60 $20.60 $5,798.24 $347,001.00 to $348,000.00 $2,281.79 $3,510.45 $20.60 $5,812.84 $348,001.00 to $349,000.00 $2,287.54 $3,519.30 $20.60 $5,827.44 $349,001.00 to $350,000.00 $2,293.30 $3,528.15 $20.60 $5,842.05 $350,001.00 to $351,000.00 $2,299.05 $3,537.00 $20.60 $5,856.65 $351,001.00 to $352,000.00 $2,304.80 $3,545.85 $20.60 $5,871.25 $352,001.00 to $353,000.00 $2,310.55 $3,554.70 $20.60 $5,885.85 $353,001.00 to $354,000.00 $2,316.31 $3,563.55 $20.60 $5,900.46 $354,001.00 to $355,000.00 $2,322.06 $3,572.40 $20.60 $5,915.06 $355,001.00 to $356,000.00 $2,327.81 $3,581.25 $20.60 $5,929.66 $356,001.00 to $357,000.00 $2,333.56 $3,590.10 $20.60 $5,944.26 Effective October 20, 2025
49 EXHIBIT A

Page 189 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$357,001.00 to $358,000.00 $2,339.32 $3,598.95 $20.60 $5,958.87 $358,001.00 to $359,000.00 $2,345.07 $3,607.80 $20.60 $5,973.47 $359,001.00 to $360,000.00 $2,350.82 $3,616.65 $20.60 $5,988.07 $360,001.00 to $361,000.00 $2,356.57 $3,625.50 $20.60 $6,002.67 $361,001.00 to $362,000.00 $2,362.33 $3,634.35 $20.60 $6,017.28 $362,001.00 to $363,000.00 $2,368.08 $3,643.20 $20.60 $6,031.88 $363,001.00 to $364,000.00 $2,373.83 $3,652.05 $20.60 $6,046.48 $364,001.00 to $365,000.00 $2,379.58 $3,660.90 $20.60 $6,061.08 $365,001.00 to $366,000.00 $2,385.34 $3,669.75 $20.60 $6,075.69 $366,001.00 to $367,000.00 $2,391.09 $3,678.60 $20.60 $6,090.29 $367,001.00 to $368,000.00 $2,396.84 $3,687.45 $20.60 $6,104.89 $368,001.00 to $369,000.00 $2,402.59 $3,696.30 $20.60 $6,119.49 $369,001.00 to $370,000.00 $2,408.35 $3,705.15 $20.60 $6,134.10 $370,001.00 to $371,000.00 $2,414.10 $3,714.00 $20.60 $6,148.70 $371,001.00 to $372,000.00 $2,419.85 $3,722.85 $20.60 $6,163.30 $372,001.00 to $373,000.00 $2,425.60 $3,731.70 $20.60 $6,177.90 $373,001.00 to $374,000.00 $2,431.36 $3,740.55 $20.60 $6,192.51 $374,001.00 to $375,000.00 $2,437.11 $3,749.40 $20.60 $6,207.11 $375,001.00 to $376,000.00 $2,442.86 $3,758.25 $20.60 $6,221.71 $376,001.00 to $377,000.00 $2,448.61 $3,767.10 $20.60 $6,236.31 $377,001.00 to $378,000.00 $2,454.37 $3,775.95 $20.60 $6,250.92 $378,001.00 to $379,000.00 $2,460.12 $3,784.80 $20.60 $6,265.52 $379,001.00 to $380,000.00 $2,465.87 $3,793.65 $20.60 $6,280.12 $380,001.00 to $381,000.00 $2,471.62 $3,802.50 $20.60 $6,294.72 $381,001.00 to $382,000.00 $2,477.38 $3,811.35 $20.60 $6,309.33 $382,001.00 to $383,000.00 $2,483.13 $3,820.20 $20.60 $6,323.93 $383,001.00 to $384,000.00 $2,488.88 $3,829.05 $20.60 $6,338.53 $384,001.00 to $385,000.00 $2,494.63 $3,837.90 $20.60 $6,353.13 $385,001.00 to $386,000.00 $2,500.39 $3,846.75 $20.60 $6,367.74 $386,001.00 to $387,000.00 $2,506.14 $3,855.60 $20.60 $6,382.34 $387,001.00 to $388,000.00 $2,511.89 $3,864.45 $20.60 $6,396.94 $388,001.00 to $389,000.00 $2,517.64 $3,873.30 $20.60 $6,411.54 $389,001.00 to $390,000.00 $2,523.40 $3,882.15 $20.60 $6,426.15 $390,001.00 to $391,000.00 $2,529.15 $3,891.00 $20.60 $6,440.75 $391,001.00 to $392,000.00 $2,534.90 $3,899.85 $20.60 $6,455.35 $392,001.00 to $393,000.00 $2,540.65 $3,908.70 $20.60 $6,469.95 $393,001.00 to $394,000.00 $2,546.41 $3,917.55 $20.60 $6,484.56 $394,001.00 to $395,000.00 $2,552.16 $3,926.40 $20.60 $6,499.16 $395,001.00 to $396,000.00 $2,557.91 $3,935.25 $20.60 $6,513.76 $396,001.00 to $397,000.00 $2,563.66 $3,944.10 $20.60 $6,528.36 $397,001.00 to $398,000.00 $2,569.42 $3,952.95 $20.60 $6,542.97 $398,001.00 to $399,000.00 $2,575.17 $3,961.80 $20.60 $6,557.57 $399,001.00 to $400,000.00 $2,580.92 $3,970.65 $20.60 $6,572.17 $400,001.00 to $401,000.00 $2,586.67 $3,979.50 $20.60 $6,586.77 $401,001.00 to $402,000.00 $2,592.43 $3,988.35 $20.60 $6,601.38 $402,001.00 to $403,000.00 $2,598.18 $3,997.20 $20.60 $6,615.98 $403,001.00 to $404,000.00 $2,603.93 $4,006.05 $20.60 $6,630.58 $404,001.00 to $405,000.00 $2,609.68 $4,014.90 $20.60 $6,645.18 $405,001.00 to $406,000.00 $2,615.44 $4,023.75 $20.60 $6,659.79 $406,001.00 to $407,000.00 $2,621.19 $4,032.60 $20.60 $6,674.39 $407,001.00 to $408,000.00 $2,626.94 $4,041.45 $20.60 $6,688.99 $408,001.00 to $409,000.00 $2,632.69 $4,050.30 $20.60 $6,703.59 $409,001.00 to $410,000.00 $2,638.45 $4,059.15 $20.60 $6,718.20 $410,001.00 to $411,000.00 $2,644.20 $4,068.00 $20.60 $6,732.80 $411,001.00 to $412,000.00 $2,649.95 $4,076.85 $20.60 $6,747.40 $412,001.00 to $413,000.00 $2,655.70 $4,085.70 $20.60 $6,762.00 $413,001.00 to $414,000.00 $2,661.46 $4,094.55 $20.60 $6,776.61 $414,001.00 to $415,000.00 $2,667.21 $4,103.40 $20.60 $6,791.21 $415,001.00 to $416,000.00 $2,672.96 $4,112.25 $20.60 $6,805.81 $416,001.00 to $417,000.00 $2,678.71 $4,121.10 $20.60 $6,820.41 $417,001.00 to $418,000.00 $2,684.47 $4,129.95 $20.60 $6,835.02 $418,001.00 to $419,000.00 $2,690.22 $4,138.80 $20.60 $6,849.62 $419,001.00 to $420,000.00 $2,695.97 $4,147.65 $20.60 $6,864.22 $420,001.00 to $421,000.00 $2,701.72 $4,156.50 $20.60 $6,878.82 $421,001.00 to $422,000.00 $2,707.48 $4,165.35 $20.60 $6,893.43 $422,001.00 to $423,000.00 $2,713.23 $4,174.20 $20.60 $6,908.03 $423,001.00 to $424,000.00 $2,718.98 $4,183.05 $20.60 $6,922.63 $424,001.00 to $425,000.00 $2,724.73 $4,191.90 $20.60 $6,937.23 $425,001.00 to $426,000.00 $2,730.49 $4,200.75 $20.60 $6,951.84 $426,001.00 to $427,000.00 $2,736.24 $4,209.60 $20.60 $6,966.44 $427,001.00 to $428,000.00 $2,741.99 $4,218.45 $20.60 $6,981.04 Effective October 20, 2025
50 EXHIBIT A

Page 190 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$428,001.00 to $429,000.00 $2,747.74 $4,227.30 $20.60 $6,995.64 $429,001.00 to $430,000.00 $2,753.50 $4,236.15 $20.60 $7,010.25 $430,001.00 to $431,000.00 $2,759.25 $4,245.00 $20.60 $7,024.85 $431,001.00 to $432,000.00 $2,765.00 $4,253.85 $20.60 $7,039.45 $432,001.00 to $433,000.00 $2,770.75 $4,262.70 $20.60 $7,054.05 $433,001.00 to $434,000.00 $2,776.51 $4,271.55 $20.60 $7,068.66 $434,001.00 to $435,000.00 $2,782.26 $4,280.40 $20.60 $7,083.26 $435,001.00 to $436,000.00 $2,788.01 $4,289.25 $20.60 $7,097.86 $436,001.00 to $437,000.00 $2,793.76 $4,298.10 $20.60 $7,112.46 $437,001.00 to $438,000.00 $2,799.52 $4,306.95 $20.60 $7,127.07 $438,001.00 to $439,000.00 $2,805.27 $4,315.80 $20.60 $7,141.67 $439,001.00 to $440,000.00 $2,811.02 $4,324.65 $20.60 $7,156.27 $440,001.00 to $441,000.00 $2,816.77 $4,333.50 $20.60 $7,170.87 $441,001.00 to $442,000.00 $2,822.53 $4,342.35 $20.60 $7,185.48 $442,001.00 to $443,000.00 $2,828.28 $4,351.20 $20.60 $7,200.08 $443,001.00 to $444,000.00 $2,834.03 $4,360.05 $20.60 $7,214.68 $444,001.00 to $445,000.00 $2,839.78 $4,368.90 $20.60 $7,229.28 $445,001.00 to $446,000.00 $2,845.54 $4,377.75 $20.60 $7,243.89 $446,001.00 to $447,000.00 $2,851.29 $4,386.60 $20.60 $7,258.49 $447,001.00 to $448,000.00 $2,857.04 $4,395.45 $20.60 $7,273.09 $448,001.00 to $449,000.00 $2,862.79 $4,404.30 $20.60 $7,287.69 $449,001.00 to $450,000.00 $2,868.55 $4,413.15 $20.60 $7,302.30 $450,001.00 to $451,000.00 $2,874.30 $4,422.00 $20.60 $7,316.90 $451,001.00 to $452,000.00 $2,880.05 $4,430.85 $20.60 $7,331.50 $452,001.00 to $453,000.00 $2,885.80 $4,439.70 $20.60 $7,346.10 $453,001.00 to $454,000.00 $2,891.56 $4,448.55 $20.60 $7,360.71 $454,001.00 to $455,000.00 $2,897.31 $4,457.40 $20.60 $7,375.31 $455,001.00 to $456,000.00 $2,903.06 $4,466.25 $20.60 $7,389.91 $456,001.00 to $457,000.00 $2,908.81 $4,475.10 $20.60 $7,404.51 $457,001.00 to $458,000.00 $2,914.57 $4,483.95 $20.60 $7,419.12 $458,001.00 to $459,000.00 $2,920.32 $4,492.80 $20.60 $7,433.72 $459,001.00 to $460,000.00 $2,926.07 $4,501.65 $20.60 $7,448.32 $460,001.00 to $461,000.00 $2,931.82 $4,510.50 $20.60 $7,462.92 $461,001.00 to $462,000.00 $2,937.58 $4,519.35 $20.60 $7,477.53 $462,001.00 to $463,000.00 $2,943.33 $4,528.20 $20.60 $7,492.13 $463,001.00 to $464,000.00 $2,949.08 $4,537.05 $20.60 $7,506.73 $464,001.00 to $465,000.00 $2,954.83 $4,545.90 $20.60 $7,521.33 $465,001.00 to $466,000.00 $2,960.59 $4,554.75 $20.60 $7,535.94 $466,001.00 to $467,000.00 $2,966.34 $4,563.60 $20.60 $7,550.54 $467,001.00 to $468,000.00 $2,972.09 $4,572.45 $20.60 $7,565.14 $468,001.00 to $469,000.00 $2,977.84 $4,581.30 $20.60 $7,579.74 $469,001.00 to $470,000.00 $2,983.60 $4,590.15 $20.60 $7,594.35 $470,001.00 to $471,000.00 $2,989.35 $4,599.00 $20.60 $7,608.95 $471,001.00 to $472,000.00 $2,995.10 $4,607.85 $20.60 $7,623.55 $472,001.00 to $473,000.00 $3,000.86 $4,616.70 $20.60 $7,638.15 $473,001.00 to $474,000.00 $3,006.61 $4,625.55 $20.60 $7,652.76 $474,001.00 to $475,000.00 $3,012.36 $4,634.40 $20.60 $7,667.36 $475,001.00 to $476,000.00 $3,018.11 $4,643.25 $20.60 $7,681.96 $476,001.00 to $477,000.00 $3,023.87 $4,652.10 $20.60 $7,696.56 $477,001.00 to $478,000.00 $3,029.62 $4,660.95 $20.60 $7,711.17 $478,001.00 to $479,000.00 $3,035.37 $4,669.80 $20.60 $7,725.77 $479,001.00 to $480,000.00 $3,041.12 $4,678.65 $20.60 $7,740.37 $480,001.00 to $481,000.00 $3,046.88 $4,687.50 $20.60 $7,754.97 $481,001.00 to $482,000.00 $3,052.63 $4,696.35 $20.60 $7,769.58 $482,001.00 to $483,000.00 $3,058.38 $4,705.20 $20.60 $7,784.18 $483,001.00 to $484,000.00 $3,064.13 $4,714.05 $20.60 $7,798.78 $484,001.00 to $485,000.00 $3,069.89 $4,722.90 $20.60 $7,813.38 $485,001.00 to $486,000.00 $3,075.64 $4,731.75 $20.60 $7,827.99 $486,001.00 to $487,000.00 $3,081.39 $4,740.60 $20.60 $7,842.59 $487,001.00 to $488,000.00 $3,087.14 $4,749.45 $20.60 $7,857.19 $488,001.00 to $489,000.00 $3,092.90 $4,758.30 $20.60 $7,871.80 $489,001.00 to $490,000.00 $3,098.65 $4,767.15 $20.60 $7,886.40 $490,001.00 to $491,000.00 $3,104.40 $4,776.00 $20.60 $7,901.00 $491,001.00 to $492,000.00 $3,110.15 $4,784.85 $20.60 $7,915.60 $492,001.00 to $493,000.00 $3,115.91 $4,793.70 $20.60 $7,930.21 $493,001.00 to $494,000.00 $3,121.66 $4,802.55 $20.60 $7,944.81 $494,001.00 to $495,000.00 $3,127.41 $4,811.40 $20.60 $7,959.41 $495,001.00 to $496,000.00 $3,133.16 $4,820.25 $20.60 $7,974.01 $496,001.00 to $497,000.00 $3,138.92 $4,829.10 $20.60 $7,988.62 $497,001.00 to $498,000.00 $3,144.67 $4,837.95 $20.60 $8,003.22 $498,001.00 to $499,000.00 $3,150.42 $4,846.80 $20.60 $8,017.82 Effective October 20, 2025
51 EXHIBIT A

Page 191 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$499,001.00 to $500,000.00 $3,156.17 $4,855.65 $20.60 $8,032.42 $500,001.00 to $501,000.00 $3,170.99 $4,878.45 $20.60 $8,070.04 $501,001.00 to $502,000.00 $3,174.60 $4,884.00 $20.60 $8,079.20 $502,001.00 to $503,000.00 $3,178.21 $4,889.55 $20.60 $8,088.36 $503,001.00 to $504,000.00 $3,181.82 $4,895.10 $20.60 $8,097.52 $504,001.00 to $505,000.00 $3,185.42 $4,900.65 $20.60 $8,106.67 $505,001.00 to $506,000.00 $3,189.03 $4,906.20 $20.60 $8,115.83 $506,001.00 to $507,000.00 $3,192.64 $4,911.75 $20.60 $8,124.99 $507,001.00 to $508,000.00 $3,196.25 $4,917.30 $20.60 $8,134.15 $508,001.00 to $509,000.00 $3,199.85 $4,922.85 $20.60 $8,143.30 $509,001.00 to $510,000.00 $3,203.46 $4,928.40 $20.60 $8,152.46 $510,001.00 to $511,000.00 $3,207.07 $4,933.95 $20.60 $8,161.62 $511,001.00 to $512,000.00 $3,210.68 $4,939.50 $20.60 $8,170.78 $512,001.00 to $513,000.00 $3,214.28 $4,945.05 $20.60 $8,179.93 $513,001.00 to $514,000.00 $3,217.89 $4,950.60 $20.60 $8,189.09 $514,001.00 to $515,000.00 $3,221.50 $4,956.15 $20.60 $8,198.25 $515,001.00 to $516,000.00 $3,225.11 $4,961.70 $20.60 $8,207.41 $516,001.00 to $517,000.00 $3,228.71 $4,967.25 $20.60 $8,216.56 $517,001.00 to $518,000.00 $3,232.32 $4,972.80 $20.60 $8,225.72 $518,001.00 to $519,000.00 $3,235.93 $4,978.35 $20.60 $8,234.88 $519,001.00 to $520,000.00 $3,239.54 $4,983.90 $20.60 $8,244.04 $520,001.00 to $521,000.00 $3,243.14 $4,989.45 $20.60 $8,253.19 $521,001.00 to $522,000.00 $3,246.75 $4,995.00 $20.60 $8,262.35 $522,001.00 to $523,000.00 $3,250.36 $5,000.55 $20.60 $8,271.51 $523,001.00 to $524,000.00 $3,253.97 $5,006.10 $20.60 $8,280.67 $524,001.00 to $525,000.00 $3,257.57 $5,011.65 $20.60 $8,289.82 $525,001.00 to $526,000.00 $3,261.18 $5,017.20 $20.60 $8,298.98 $526,001.00 to $527,000.00 $3,264.79 $5,022.75 $20.60 $8,308.14 $527,001.00 to $528,000.00 $3,268.40 $5,028.30 $20.60 $8,317.30 $528,001.00 to $529,000.00 $3,272.00 $5,033.85 $20.60 $8,326.45 $529,001.00 to $530,000.00 $3,275.61 $5,039.40 $20.60 $8,335.61 $530,001.00 to $531,000.00 $3,279.22 $5,044.95 $20.60 $8,344.77 $531,001.00 to $532,000.00 $3,282.83 $5,050.50 $20.60 $8,353.93 $532,001.00 to $533,000.00 $3,286.43 $5,056.05 $20.60 $8,363.08 $533,001.00 to $534,000.00 $3,290.04 $5,061.60 $20.60 $8,372.24 $534,001.00 to $535,000.00 $3,293.65 $5,067.15 $20.60 $8,381.40 $535,001.00 to $536,000.00 $3,297.26 $5,072.70 $20.60 $8,390.56 $536,001.00 to $537,000.00 $3,300.86 $5,078.25 $20.60 $8,399.71 $537,001.00 to $538,000.00 $3,304.47 $5,083.80 $20.60 $8,408.87 $538,001.00 to $539,000.00 $3,308.08 $5,089.35 $20.60 $8,418.03 $539,001.00 to $540,000.00 $3,311.69 $5,094.90 $20.60 $8,427.19 $540,001.00 to $541,000.00 $3,315.29 $5,100.45 $20.60 $8,436.34 $541,001.00 to $542,000.00 $3,318.90 $5,106.00 $20.60 $8,445.50 $542,001.00 to $543,000.00 $3,322.51 $5,111.55 $20.60 $8,454.66 $543,001.00 to $544,000.00 $3,326.12 $5,117.10 $20.60 $8,463.82 $544,001.00 to $545,000.00 $3,329.72 $5,122.65 $20.60 $8,472.97 $545,001.00 to $546,000.00 $3,333.33 $5,128.20 $20.60 $8,482.13 $546,001.00 to $547,000.00 $3,336.94 $5,133.75 $20.60 $8,491.29 $547,001.00 to $548,000.00 $3,340.55 $5,139.30 $20.60 $8,500.45 $548,001.00 to $549,000.00 $3,344.15 $5,144.85 $20.60 $8,509.60 $549,001.00 to $550,000.00 $3,347.76 $5,150.40 $20.60 $8,518.76 $550,001.00 to $551,000.00 $3,351.37 $5,155.95 $20.60 $8,527.92 $551,001.00 to $552,000.00 $3,354.98 $5,161.50 $20.60 $8,537.08 $552,001.00 to $553,000.00 $3,358.58 $5,167.05 $20.60 $8,546.23 $553,001.00 to $554,000.00 $3,362.19 $5,172.60 $20.60 $8,555.39 $554,001.00 to $555,000.00 $3,365.80 $5,178.15 $20.60 $8,564.55 $555,001.00 to $556,000.00 $3,369.41 $5,183.70 $20.60 $8,573.71 $556,001.00 to $557,000.00 $3,373.01 $5,189.25 $20.60 $8,582.86 $557,001.00 to $558,000.00 $3,376.62 $5,194.80 $20.60 $8,592.02 $558,001.00 to $559,000.00 $3,380.23 $5,200.35 $20.60 $8,601.18 $559,001.00 to $560,000.00 $3,383.84 $5,205.90 $20.60 $8,610.34 $560,001.00 to $561,000.00 $3,387.44 $5,211.45 $20.60 $8,619.49 $561,001.00 to $562,000.00 $3,391.05 $5,217.00 $20.60 $8,628.65 $562,001.00 to $563,000.00 $3,394.66 $5,222.55 $20.60 $8,637.81 $563,001.00 to $564,000.00 $3,398.27 $5,228.10 $20.60 $8,646.97 $564,001.00 to $565,000.00 $3,401.87 $5,233.65 $20.60 $8,656.12 $565,001.00 to $566,000.00 $3,405.48 $5,239.20 $20.60 $8,665.28 $566,001.00 to $567,000.00 $3,409.09 $5,244.75 $20.60 $8,674.44 $567,001.00 to $568,000.00 $3,412.70 $5,250.30 $20.60 $8,683.60 $568,001.00 to $569,000.00 $3,416.30 $5,255.85 $20.60 $8,692.75 $569,001.00 to $570,000.00 $3,419.91 $5,261.40 $20.60 $8,701.91 Effective October 20, 2025
52 EXHIBIT A

Page 192 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$570,001.00 to $571,000.00 $3,423.52 $5,266.95 $20.60 $8,711.07 $571,001.00 to $572,000.00 $3,427.13 $5,272.50 $20.60 $8,720.23 $572,001.00 to $573,000.00 $3,430.73 $5,278.05 $20.60 $8,729.38 $573,001.00 to $574,000.00 $3,434.34 $5,283.60 $20.60 $8,738.54 $574,001.00 to $575,000.00 $3,437.95 $5,289.15 $20.60 $8,747.70 $575,001.00 to $576,000.00 $3,441.56 $5,294.70 $20.60 $8,756.86 $576,001.00 to $577,000.00 $3,445.16 $5,300.25 $20.60 $8,766.01 $577,001.00 to $578,000.00 $3,448.77 $5,305.80 $20.60 $8,775.17 $578,001.00 to $579,000.00 $3,452.38 $5,311.35 $20.60 $8,784.33 $579,001.00 to $580,000.00 $3,455.99 $5,316.90 $20.60 $8,793.49 $580,001.00 to $581,000.00 $3,459.59 $5,322.45 $20.60 $8,802.64 $581,001.00 to $582,000.00 $3,463.20 $5,328.00 $20.60 $8,811.80 $582,001.00 to $583,000.00 $3,466.81 $5,333.55 $20.60 $8,820.96 $583,001.00 to $584,000.00 $3,470.42 $5,339.10 $20.60 $8,830.12 $584,001.00 to $585,000.00 $3,474.02 $5,344.65 $20.60 $8,839.27 $585,001.00 to $586,000.00 $3,477.63 $5,350.20 $20.60 $8,848.43 $586,001.00 to $587,000.00 $3,481.24 $5,355.75 $20.60 $8,857.59 $587,001.00 to $588,000.00 $3,484.85 $5,361.30 $20.60 $8,866.75 $588,001.00 to $589,000.00 $3,488.45 $5,366.85 $20.60 $8,875.90 $589,001.00 to $590,000.00 $3,492.06 $5,372.40 $20.60 $8,885.06 $590,001.00 to $591,000.00 $3,495.67 $5,377.95 $20.60 $8,894.22 $591,001.00 to $592,000.00 $3,499.28 $5,383.50 $20.60 $8,903.38 $592,001.00 to $593,000.00 $3,502.88 $5,389.05 $20.60 $8,912.53 $593,001.00 to $594,000.00 $3,506.49 $5,394.60 $20.60 $8,921.69 $594,001.00 to $595,000.00 $3,510.10 $5,400.15 $20.60 $8,930.85 $595,001.00 to $596,000.00 $3,513.71 $5,405.70 $20.60 $8,940.01 $596,001.00 to $597,000.00 $3,517.31 $5,411.25 $20.60 $8,949.16 $597,001.00 to $598,000.00 $3,520.92 $5,416.80 $20.60 $8,958.32 $598,001.00 to $599,000.00 $3,524.53 $5,422.35 $20.60 $8,967.48 $599,001.00 to $600,000.00 $3,528.14 $5,427.90 $20.60 $8,976.64 $600,001.00 to $601,000.00 $3,531.74 $5,433.45 $20.60 $8,985.79 $601,001.00 to $602,000.00 $3,535.35 $5,439.00 $20.60 $8,994.95 $602,001.00 to $603,000.00 $3,538.96 $5,444.55 $20.60 $9,004.11 $603,001.00 to $604,000.00 $3,542.57 $5,450.10 $20.60 $9,013.27 $604,001.00 to $605,000.00 $3,546.17 $5,455.65 $20.60 $9,022.42 $605,001.00 to $606,000.00 $3,549.78 $5,461.20 $20.60 $9,031.58 $606,001.00 to $607,000.00 $3,553.39 $5,466.75 $20.60 $9,040.74 $607,001.00 to $608,000.00 $3,557.00 $5,472.30 $20.60 $9,049.90 $608,001.00 to $609,000.00 $3,560.60 $5,477.85 $20.60 $9,059.05 $609,001.00 to $610,000.00 $3,564.21 $5,483.40 $20.60 $9,068.21 $610,001.00 to $611,000.00 $3,567.82 $5,488.95 $20.60 $9,077.37 $611,001.00 to $612,000.00 $3,571.43 $5,494.50 $20.60 $9,086.53 $612,001.00 to $613,000.00 $3,575.03 $5,500.05 $20.60 $9,095.68 $613,001.00 to $614,000.00 $3,578.64 $5,505.60 $20.60 $9,104.84 $614,001.00 to $615,000.00 $3,582.25 $5,511.15 $20.60 $9,114.00 $615,001.00 to $616,000.00 $3,585.86 $5,516.70 $20.60 $9,123.16 $616,001.00 to $617,000.00 $3,589.46 $5,522.25 $20.60 $9,132.31 $617,001.00 to $618,000.00 $3,593.07 $5,527.80 $20.60 $9,141.47 $618,001.00 to $619,000.00 $3,596.68 $5,533.35 $20.60 $9,150.63 $619,001.00 to $620,000.00 $3,600.29 $5,538.90 $20.60 $9,159.79 $620,001.00 to $621,000.00 $3,603.89 $5,544.45 $20.60 $9,168.94 $621,001.00 to $622,000.00 $3,607.50 $5,550.00 $20.60 $9,178.10 $622,001.00 to $623,000.00 $3,611.11 $5,555.55 $20.60 $9,187.26 $623,001.00 to $624,000.00 $3,614.72 $5,561.10 $20.60 $9,196.42 $624,001.00 to $625,000.00 $3,618.32 $5,566.65 $20.60 $9,205.57 $625,001.00 to $626,000.00 $3,621.93 $5,572.20 $20.60 $9,214.73 $626,001.00 to $627,000.00 $3,625.54 $5,577.75 $20.60 $9,223.89 $627,001.00 to $628,000.00 $3,629.15 $5,583.30 $20.60 $9,233.05 $628,001.00 to $629,000.00 $3,632.75 $5,588.85 $20.60 $9,242.20 $629,001.00 to $630,000.00 $3,636.36 $5,594.40 $20.60 $9,251.36 $630,001.00 to $631,000.00 $3,639.97 $5,599.95 $20.60 $9,260.52 $631,001.00 to $632,000.00 $3,643.58 $5,605.50 $20.60 $9,269.68 $632,001.00 to $633,000.00 $3,647.18 $5,611.05 $20.60 $9,278.83 $633,001.00 to $634,000.00 $3,650.79 $5,616.60 $20.60 $9,287.99 $634,001.00 to $635,000.00 $3,654.40 $5,622.15 $20.60 $9,297.15 $635,001.00 to $636,000.00 $3,658.01 $5,627.70 $20.60 $9,306.31 $636,001.00 to $637,000.00 $3,661.61 $5,633.25 $20.60 $9,315.46 $637,001.00 to $638,000.00 $3,665.22 $5,638.80 $20.60 $9,324.62 $638,001.00 to $639,000.00 $3,668.83 $5,644.35 $20.60 $9,333.78 $639,001.00 to $640,000.00 $3,672.44 $5,649.90 $20.60 $9,342.94 $640,001.00 to $641,000.00 $3,676.04 $5,655.45 $20.60 $9,352.09 Effective October 20, 2025
53 EXHIBIT A

Page 193 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$641,001.00 to $642,000.00 $3,679.65 $5,661.00 $20.60 $9,361.25 $642,001.00 to $643,000.00 $3,683.26 $5,666.55 $20.60 $9,370.41 $643,001.00 to $644,000.00 $3,686.87 $5,672.10 $20.60 $9,379.57 $644,001.00 to $645,000.00 $3,690.47 $5,677.65 $20.60 $9,388.72 $645,001.00 to $646,000.00 $3,694.08 $5,683.20 $20.60 $9,397.88 $646,001.00 to $647,000.00 $3,697.69 $5,688.75 $20.60 $9,407.04 $647,001.00 to $648,000.00 $3,701.30 $5,694.30 $20.60 $9,416.20 $648,001.00 to $649,000.00 $3,704.90 $5,699.85 $20.60 $9,425.35 $649,001.00 to $650,000.00 $3,708.51 $5,705.40 $20.60 $9,434.51 $650,001.00 to $651,000.00 $3,712.12 $5,710.95 $20.60 $9,443.67 $651,001.00 to $652,000.00 $3,715.73 $5,716.50 $20.60 $9,452.83 $652,001.00 to $653,000.00 $3,719.33 $5,722.05 $20.60 $9,461.98 $653,001.00 to $654,000.00 $3,722.94 $5,727.60 $20.60 $9,471.14 $654,001.00 to $655,000.00 $3,726.55 $5,733.15 $20.60 $9,480.30 $655,001.00 to $656,000.00 $3,730.16 $5,738.70 $20.60 $9,489.46 $656,001.00 to $657,000.00 $3,733.76 $5,744.25 $20.60 $9,498.61 $657,001.00 to $658,000.00 $3,737.37 $5,749.80 $20.60 $9,507.77 $658,001.00 to $659,000.00 $3,740.98 $5,755.35 $20.60 $9,516.93 $659,001.00 to $660,000.00 $3,744.59 $5,760.90 $20.60 $9,526.09 $660,001.00 to $661,000.00 $3,748.19 $5,766.45 $20.60 $9,535.24 $661,001.00 to $662,000.00 $3,751.80 $5,772.00 $20.60 $9,544.40 $662,001.00 to $663,000.00 $3,755.41 $5,777.55 $20.60 $9,553.56 $663,001.00 to $664,000.00 $3,759.02 $5,783.10 $20.60 $9,562.72 $664,001.00 to $665,000.00 $3,762.62 $5,788.65 $20.60 $9,571.87 $665,001.00 to $666,000.00 $3,766.23 $5,794.20 $20.60 $9,581.03 $666,001.00 to $667,000.00 $3,769.84 $5,799.75 $20.60 $9,590.19 $667,001.00 to $668,000.00 $3,773.45 $5,805.30 $20.60 $9,599.35 $668,001.00 to $669,000.00 $3,777.05 $5,810.85 $20.60 $9,608.50 $669,001.00 to $670,000.00 $3,780.66 $5,816.40 $20.60 $9,617.66 $670,001.00 to $671,000.00 $3,784.27 $5,821.95 $20.60 $9,626.82 $671,001.00 to $672,000.00 $3,787.88 $5,827.50 $20.60 $9,635.98 $672,001.00 to $673,000.00 $3,791.48 $5,833.05 $20.60 $9,645.13 $673,001.00 to $674,000.00 $3,795.09 $5,838.60 $20.60 $9,654.29 $674,001.00 to $675,000.00 $3,798.70 $5,844.15 $20.60 $9,663.45 $675,001.00 to $676,000.00 $3,802.31 $5,849.70 $20.60 $9,672.61 $676,001.00 to $677,000.00 $3,805.91 $5,855.25 $20.60 $9,681.76 $677,001.00 to $678,000.00 $3,809.52 $5,860.80 $20.60 $9,690.92 $678,001.00 to $679,000.00 $3,813.13 $5,866.35 $20.60 $9,700.08 $679,001.00 to $680,000.00 $3,816.74 $5,871.90 $20.60 $9,709.24 $680,001.00 to $681,000.00 $3,820.34 $5,877.45 $20.60 $9,718.39 $681,001.00 to $682,000.00 $3,823.95 $5,883.00 $20.60 $9,727.55 $682,001.00 to $683,000.00 $3,827.56 $5,888.55 $20.60 $9,736.71 $683,001.00 to $684,000.00 $3,831.17 $5,894.10 $20.60 $9,745.87 $684,001.00 to $685,000.00 $3,834.77 $5,899.65 $20.60 $9,755.02 $685,001.00 to $686,000.00 $3,838.38 $5,905.20 $20.60 $9,764.18 $686,001.00 to $687,000.00 $3,841.99 $5,910.75 $20.60 $9,773.34 $687,001.00 to $688,000.00 $3,845.60 $5,916.30 $20.60 $9,782.50 $688,001.00 to $689,000.00 $3,849.20 $5,921.85 $20.60 $9,791.65 $689,001.00 to $690,000.00 $3,852.81 $5,927.40 $20.60 $9,800.81 $690,001.00 to $691,000.00 $3,856.42 $5,932.95 $20.60 $9,809.97 $691,001.00 to $692,000.00 $3,860.03 $5,938.50 $20.60 $9,819.13 $692,001.00 to $693,000.00 $3,863.63 $5,944.05 $20.60 $9,828.28 $693,001.00 to $694,000.00 $3,867.24 $5,949.60 $20.60 $9,837.44 $694,001.00 to $695,000.00 $3,870.85 $5,955.15 $20.60 $9,846.60 $695,001.00 to $696,000.00 $3,874.46 $5,960.70 $20.60 $9,855.76 $696,001.00 to $697,000.00 $3,878.06 $5,966.25 $20.60 $9,864.91 $697,001.00 to $698,000.00 $3,881.67 $5,971.80 $20.60 $9,874.07 $698,001.00 to $699,000.00 $3,885.28 $5,977.35 $20.60 $9,883.23 $699,001.00 to $700,000.00 $3,888.89 $5,982.90 $20.60 $9,892.39 $700,001.00 to $701,000.00 $3,892.49 $5,988.45 $20.60 $9,901.54 $701,001.00 to $702,000.00 $3,896.10 $5,994.00 $20.60 $9,910.70 $702,001.00 to $703,000.00 $3,899.71 $5,999.55 $20.60 $9,919.86 $703,001.00 to $704,000.00 $3,903.32 $6,005.10 $20.60 $9,929.02 $704,001.00 to $705,000.00 $3,906.92 $6,010.65 $20.60 $9,938.17 $705,001.00 to $706,000.00 $3,910.53 $6,016.20 $20.60 $9,947.33 $706,001.00 to $707,000.00 $3,914.14 $6,021.75 $20.60 $9,956.49 $707,001.00 to $708,000.00 $3,917.75 $6,027.30 $20.60 $9,965.65 $708,001.00 to $709,000.00 $3,921.35 $6,032.85 $20.60 $9,974.80 $709,001.00 to $710,000.00 $3,924.96 $6,038.40 $20.60 $9,983.96 $710,001.00 to $711,000.00 $3,928.57 $6,043.95 $20.60 $9,993.12 $711,001.00 to $712,000.00 $3,932.18 $6,049.50 $20.60 $10,002.28 Effective October 20, 2025
54 EXHIBIT A

Page 194 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$712,001.00 to $713,000.00 $3,935.78 $6,055.05 $20.60 $10,011.43 $713,001.00 to $714,000.00 $3,939.39 $6,060.60 $20.60 $10,020.59 $714,001.00 to $715,000.00 $3,943.00 $6,066.15 $20.60 $10,029.75 $715,001.00 to $716,000.00 $3,946.61 $6,071.70 $20.60 $10,038.91 $716,001.00 to $717,000.00 $3,950.21 $6,077.25 $20.60 $10,048.06 $717,001.00 to $718,000.00 $3,953.82 $6,082.80 $20.60 $10,057.22 $718,001.00 to $719,000.00 $3,957.43 $6,088.35 $20.60 $10,066.38 $719,001.00 to $720,000.00 $3,961.04 $6,093.90 $20.60 $10,075.54 $720,001.00 to $721,000.00 $3,964.64 $6,099.45 $20.60 $10,084.69 $721,001.00 to $722,000.00 $3,968.25 $6,105.00 $20.60 $10,093.85 $722,001.00 to $723,000.00 $3,971.86 $6,110.55 $20.60 $10,103.01 $723,001.00 to $724,000.00 $3,975.47 $6,116.10 $20.60 $10,112.17 $724,001.00 to $725,000.00 $3,979.07 $6,121.65 $20.60 $10,121.32 $725,001.00 to $726,000.00 $3,982.68 $6,127.20 $20.60 $10,130.48 $726,001.00 to $727,000.00 $3,986.29 $6,132.75 $20.60 $10,139.64 $727,001.00 to $728,000.00 $3,989.90 $6,138.30 $20.60 $10,148.80 $728,001.00 to $729,000.00 $3,993.50 $6,143.85 $20.60 $10,157.95 $729,001.00 to $730,000.00 $3,997.11 $6,149.40 $20.60 $10,167.11 $730,001.00 to $731,000.00 $4,000.72 $6,154.95 $20.60 $10,176.27 $731,001.00 to $732,000.00 $4,004.33 $6,160.50 $20.60 $10,185.43 $732,001.00 to $733,000.00 $4,007.93 $6,166.05 $20.60 $10,194.58 $733,001.00 to $734,000.00 $4,011.54 $6,171.60 $20.60 $10,203.74 $734,001.00 to $735,000.00 $4,015.15 $6,177.15 $20.60 $10,212.90 $735,001.00 to $736,000.00 $4,018.76 $6,182.70 $20.60 $10,222.06 $736,001.00 to $737,000.00 $4,022.36 $6,188.25 $20.60 $10,231.21 $737,001.00 to $738,000.00 $4,025.97 $6,193.80 $20.60 $10,240.37 $738,001.00 to $739,000.00 $4,029.58 $6,199.35 $20.60 $10,249.53 $739,001.00 to $740,000.00 $4,033.19 $6,204.90 $20.60 $10,258.69 $740,001.00 to $741,000.00 $4,036.79 $6,210.45 $20.60 $10,267.84 $741,001.00 to $742,000.00 $4,040.40 $6,216.00 $20.60 $10,277.00 $742,001.00 to $743,000.00 $4,044.01 $6,221.55 $20.60 $10,286.16 $743,001.00 to $744,000.00 $4,047.62 $6,227.10 $20.60 $10,295.32 $744,001.00 to $745,000.00 $4,051.22 $6,232.65 $20.60 $10,304.47 $745,001.00 to $746,000.00 $4,054.83 $6,238.20 $20.60 $10,313.63 $746,001.00 to $747,000.00 $4,058.44 $6,243.75 $20.60 $10,322.79 $747,001.00 to $748,000.00 $4,062.05 $6,249.30 $20.60 $10,331.95 $748,001.00 to $749,000.00 $4,065.65 $6,254.85 $20.60 $10,341.10 $749,001.00 to $750,000.00 $4,069.26 $6,260.40 $20.60 $10,350.26 $750,001.00 to $751,000.00 $4,072.87 $6,265.95 $20.60 $10,359.42 $751,001.00 to $752,000.00 $4,076.48 $6,271.50 $20.60 $10,368.58 $752,001.00 to $753,000.00 $4,080.08 $6,277.05 $20.60 $10,377.73 $753,001.00 to $754,000.00 $4,083.69 $6,282.60 $20.60 $10,386.89 $754,001.00 to $755,000.00 $4,087.30 $6,288.15 $20.60 $10,396.05 $755,001.00 to $756,000.00 $4,090.91 $6,293.70 $20.60 $10,405.21 $756,001.00 to $757,000.00 $4,094.51 $6,299.25 $20.60 $10,414.36 $757,001.00 to $758,000.00 $4,098.12 $6,304.80 $20.60 $10,423.52 $758,001.00 to $759,000.00 $4,101.73 $6,310.35 $20.60 $10,432.68 $759,001.00 to $760,000.00 $4,105.34 $6,315.90 $20.60 $10,441.84 $760,001.00 to $761,000.00 $4,108.94 $6,321.45 $20.60 $10,450.99 $761,001.00 to $762,000.00 $4,112.55 $6,327.00 $20.60 $10,460.15 $762,001.00 to $763,000.00 $4,116.16 $6,332.55 $20.60 $10,469.31 $763,001.00 to $764,000.00 $4,119.77 $6,338.10 $20.60 $10,478.47 $764,001.00 to $765,000.00 $4,123.37 $6,343.65 $20.60 $10,487.62 $765,001.00 to $766,000.00 $4,126.98 $6,349.20 $20.60 $10,496.78 $766,001.00 to $767,000.00 $4,130.59 $6,354.75 $20.60 $10,505.94 $767,001.00 to $768,000.00 $4,134.20 $6,360.30 $20.60 $10,515.10 $768,001.00 to $769,000.00 $4,137.80 $6,365.85 $20.60 $10,524.25 $769,001.00 to $770,000.00 $4,141.41 $6,371.40 $20.60 $10,533.41 $770,001.00 to $771,000.00 $4,145.02 $6,376.95 $20.60 $10,542.57 $771,001.00 to $772,000.00 $4,148.63 $6,382.50 $20.60 $10,551.73 $772,001.00 to $773,000.00 $4,152.23 $6,388.05 $20.60 $10,560.88 $773,001.00 to $774,000.00 $4,155.84 $6,393.60 $20.60 $10,570.04 $774,001.00 to $775,000.00 $4,159.45 $6,399.15 $20.60 $10,579.20 $775,001.00 to $776,000.00 $4,163.06 $6,404.70 $20.60 $10,588.36 $776,001.00 to $777,000.00 $4,166.66 $6,410.25 $20.60 $10,597.51 $777,001.00 to $778,000.00 $4,170.27 $6,415.80 $20.60 $10,606.67 $778,001.00 to $779,000.00 $4,173.88 $6,421.35 $20.60 $10,615.83 $779,001.00 to $780,000.00 $4,177.49 $6,426.90 $20.60 $10,624.99 $780,001.00 to $781,000.00 $4,181.09 $6,432.45 $20.60 $10,634.14 $781,001.00 to $782,000.00 $4,184.70 $6,438.00 $20.60 $10,643.30 $782,001.00 to $783,000.00 $4,188.31 $6,443.55 $20.60 $10,652.46 Effective October 20, 2025
55 EXHIBIT A

Page 195 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$783,001.00 to $784,000.00 $4,191.92 $6,449.10 $20.60 $10,661.62 $784,001.00 to $785,000.00 $4,195.52 $6,454.65 $20.60 $10,670.77 $785,001.00 to $786,000.00 $4,199.13 $6,460.20 $20.60 $10,679.93 $786,001.00 to $787,000.00 $4,202.74 $6,465.75 $20.60 $10,689.09 $787,001.00 to $788,000.00 $4,206.35 $6,471.30 $20.60 $10,698.25 $788,001.00 to $789,000.00 $4,209.95 $6,476.85 $20.60 $10,707.40 $789,001.00 to $790,000.00 $4,213.56 $6,482.40 $20.60 $10,716.56 $790,001.00 to $791,000.00 $4,217.17 $6,487.95 $20.60 $10,725.72 $791,001.00 to $792,000.00 $4,220.78 $6,493.50 $20.60 $10,734.88 $792,001.00 to $793,000.00 $4,224.38 $6,499.05 $20.60 $10,744.03 $793,001.00 to $794,000.00 $4,227.99 $6,504.60 $20.60 $10,753.19 $794,001.00 to $795,000.00 $4,231.60 $6,510.15 $20.60 $10,762.35 $795,001.00 to $796,000.00 $4,235.21 $6,515.70 $20.60 $10,771.51 $796,001.00 to $797,000.00 $4,238.81 $6,521.25 $20.60 $10,780.66 $797,001.00 to $798,000.00 $4,242.42 $6,526.80 $20.60 $10,789.82 $798,001.00 to $799,000.00 $4,246.03 $6,532.35 $20.60 $10,798.98 $799,001.00 to $800,000.00 $4,249.64 $6,537.90 $20.60 $10,808.14 $800,001.00 to $801,000.00 $4,253.24 $6,543.45 $20.60 $10,817.29 $801,001.00 to $802,000.00 $4,256.85 $6,549.00 $20.60 $10,826.45 $802,001.00 to $803,000.00 $4,260.46 $6,554.55 $20.60 $10,835.61 $803,001.00 to $804,000.00 $4,264.07 $6,560.10 $20.60 $10,844.77 $804,001.00 to $805,000.00 $4,267.67 $6,565.65 $20.60 $10,853.92 $805,001.00 to $806,000.00 $4,271.28 $6,571.20 $20.60 $10,863.08 $806,001.00 to $807,000.00 $4,274.89 $6,576.75 $20.60 $10,872.24 $807,001.00 to $808,000.00 $4,278.50 $6,582.30 $20.60 $10,881.40 $808,001.00 to $809,000.00 $4,282.10 $6,587.85 $20.60 $10,890.55 $809,001.00 to $810,000.00 $4,285.71 $6,593.40 $20.60 $10,899.71 $810,001.00 to $811,000.00 $4,289.32 $6,598.95 $20.60 $10,908.87 $811,001.00 to $812,000.00 $4,292.93 $6,604.50 $20.60 $10,918.03 $812,001.00 to $813,000.00 $4,296.53 $6,610.05 $20.60 $10,927.18 $813,001.00 to $814,000.00 $4,300.14 $6,615.60 $20.60 $10,936.34 $814,001.00 to $815,000.00 $4,303.75 $6,621.15 $20.60 $10,945.50 $815,001.00 to $816,000.00 $4,307.36 $6,626.70 $20.60 $10,954.66 $816,001.00 to $817,000.00 $4,310.96 $6,632.25 $20.60 $10,963.81 $817,001.00 to $818,000.00 $4,314.57 $6,637.80 $20.60 $10,972.97 $818,001.00 to $819,000.00 $4,318.18 $6,643.35 $20.60 $10,982.13 $819,001.00 to $820,000.00 $4,321.79 $6,648.90 $20.60 $10,991.29 $820,001.00 to $821,000.00 $4,325.39 $6,654.45 $20.60 $11,000.44 $821,001.00 to $822,000.00 $4,329.00 $6,660.00 $20.60 $11,009.60 $822,001.00 to $823,000.00 $4,332.61 $6,665.55 $20.60 $11,018.76 $823,001.00 to $824,000.00 $4,336.22 $6,671.10 $20.60 $11,027.92 $824,001.00 to $825,000.00 $4,339.82 $6,676.65 $20.60 $11,037.07 $825,001.00 to $826,000.00 $4,343.43 $6,682.20 $20.60 $11,046.23 $826,001.00 to $827,000.00 $4,347.04 $6,687.75 $20.60 $11,055.39 $827,001.00 to $828,000.00 $4,350.65 $6,693.30 $20.60 $11,064.55 $828,001.00 to $829,000.00 $4,354.25 $6,698.85 $20.60 $11,073.70 $829,001.00 to $830,000.00 $4,357.86 $6,704.40 $20.60 $11,082.86 $830,001.00 to $831,000.00 $4,361.47 $6,709.95 $20.60 $11,092.02 $831,001.00 to $832,000.00 $4,365.08 $6,715.50 $20.60 $11,101.18 $832,001.00 to $833,000.00 $4,368.68 $6,721.05 $20.60 $11,110.33 $833,001.00 to $834,000.00 $4,372.29 $6,726.60 $20.60 $11,119.49 $834,001.00 to $835,000.00 $4,375.90 $6,732.15 $20.60 $11,128.65 $835,001.00 to $836,000.00 $4,379.51 $6,737.70 $20.60 $11,137.81 $836,001.00 to $837,000.00 $4,383.11 $6,743.25 $20.60 $11,146.96 $837,001.00 to $838,000.00 $4,386.72 $6,748.80 $20.60 $11,156.12 $838,001.00 to $839,000.00 $4,390.33 $6,754.35 $20.60 $11,165.28 $839,001.00 to $840,000.00 $4,393.94 $6,759.90 $20.60 $11,174.44 $840,001.00 to $841,000.00 $4,397.54 $6,765.45 $20.60 $11,183.59 $841,001.00 to $842,000.00 $4,401.15 $6,771.00 $20.60 $11,192.75 $842,001.00 to $843,000.00 $4,404.76 $6,776.55 $20.60 $11,201.91 $843,001.00 to $844,000.00 $4,408.37 $6,782.10 $20.60 $11,211.07 $844,001.00 to $845,000.00 $4,411.97 $6,787.65 $20.60 $11,220.22 $845,001.00 to $846,000.00 $4,415.58 $6,793.20 $20.60 $11,229.38 $846,001.00 to $847,000.00 $4,419.19 $6,798.75 $20.60 $11,238.54 $847,001.00 to $848,000.00 $4,422.80 $6,804.30 $20.60 $11,247.70 $848,001.00 to $849,000.00 $4,426.40 $6,809.85 $20.60 $11,256.85 $849,001.00 to $850,000.00 $4,430.01 $6,815.40 $20.60 $11,266.01 $850,001.00 to $851,000.00 $4,433.62 $6,820.95 $20.60 $11,275.17 $851,001.00 to $852,000.00 $4,437.23 $6,826.50 $20.60 $11,284.33 $852,001.00 to $853,000.00 $4,440.83 $6,832.05 $20.60 $11,293.48 $853,001.00 to $854,000.00 $4,444.44 $6,837.60 $20.60 $11,302.64 Effective October 20, 2025
56 EXHIBIT A

Page 196 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$854,001.00 to $855,000.00 $4,448.05 $6,843.15 $20.60 $11,311.80 $855,001.00 to $856,000.00 $4,451.66 $6,848.70 $20.60 $11,320.96 $856,001.00 to $857,000.00 $4,455.26 $6,854.25 $20.60 $11,330.11 $857,001.00 to $858,000.00 $4,458.87 $6,859.80 $20.60 $11,339.27 $858,001.00 to $859,000.00 $4,462.48 $6,865.35 $20.60 $11,348.43 $859,001.00 to $860,000.00 $4,466.09 $6,870.90 $20.60 $11,357.59 $860,001.00 to $861,000.00 $4,469.69 $6,876.45 $20.60 $11,366.74 $861,001.00 to $862,000.00 $4,473.30 $6,882.00 $20.60 $11,375.90 $862,001.00 to $863,000.00 $4,476.91 $6,887.55 $20.60 $11,385.06 $863,001.00 to $864,000.00 $4,480.52 $6,893.10 $20.60 $11,394.22 $864,001.00 to $865,000.00 $4,484.12 $6,898.65 $20.60 $11,403.37 $865,001.00 to $866,000.00 $4,487.73 $6,904.20 $20.60 $11,412.53 $866,001.00 to $867,000.00 $4,491.34 $6,909.75 $20.60 $11,421.69 $867,001.00 to $868,000.00 $4,494.95 $6,915.30 $20.60 $11,430.85 $868,001.00 to $869,000.00 $4,498.55 $6,920.85 $20.60 $11,440.00 $869,001.00 to $870,000.00 $4,502.16 $6,926.40 $20.60 $11,449.16 $870,001.00 to $871,000.00 $4,505.77 $6,931.95 $20.60 $11,458.32 $871,001.00 to $872,000.00 $4,509.38 $6,937.50 $20.60 $11,467.48 $872,001.00 to $873,000.00 $4,512.98 $6,943.05 $20.60 $11,476.63 $873,001.00 to $874,000.00 $4,516.59 $6,948.60 $20.60 $11,485.79 $874,001.00 to $875,000.00 $4,520.20 $6,954.15 $20.60 $11,494.95 $875,001.00 to $876,000.00 $4,523.81 $6,959.70 $20.60 $11,504.11 $876,001.00 to $877,000.00 $4,527.41 $6,965.25 $20.60 $11,513.26 $877,001.00 to $878,000.00 $4,531.02 $6,970.80 $20.60 $11,522.42 $878,001.00 to $879,000.00 $4,534.63 $6,976.35 $20.60 $11,531.58 $879,001.00 to $880,000.00 $4,538.24 $6,981.90 $20.60 $11,540.74 $880,001.00 to $881,000.00 $4,541.84 $6,987.45 $20.60 $11,549.89 $881,001.00 to $882,000.00 $4,545.45 $6,993.00 $20.60 $11,559.05 $882,001.00 to $883,000.00 $4,549.06 $6,998.55 $20.60 $11,568.21 $883,001.00 to $884,000.00 $4,552.67 $7,004.10 $20.60 $11,577.37 $884,001.00 to $885,000.00 $4,556.27 $7,009.65 $20.60 $11,586.52 $885,001.00 to $886,000.00 $4,559.88 $7,015.20 $20.60 $11,595.68 $886,001.00 to $887,000.00 $4,563.49 $7,020.75 $20.60 $11,604.84 $887,001.00 to $888,000.00 $4,567.10 $7,026.30 $20.60 $11,614.00 $888,001.00 to $889,000.00 $4,570.70 $7,031.85 $20.60 $11,623.15 $889,001.00 to $890,000.00 $4,574.31 $7,037.40 $20.60 $11,632.31 $890,001.00 to $891,000.00 $4,577.92 $7,042.95 $20.60 $11,641.47 $891,001.00 to $892,000.00 $4,581.53 $7,048.50 $20.60 $11,650.63 $892,001.00 to $893,000.00 $4,585.13 $7,054.05 $20.60 $11,659.78 $893,001.00 to $894,000.00 $4,588.74 $7,059.60 $20.60 $11,668.94 $894,001.00 to $895,000.00 $4,592.35 $7,065.15 $20.60 $11,678.10 $895,001.00 to $896,000.00 $4,595.96 $7,070.70 $20.60 $11,687.26 $896,001.00 to $897,000.00 $4,599.56 $7,076.25 $20.60 $11,696.41 $897,001.00 to $898,000.00 $4,603.17 $7,081.80 $20.60 $11,705.57 $898,001.00 to $899,000.00 $4,606.78 $7,087.35 $20.60 $11,714.73 $899,001.00 to $900,000.00 $4,610.39 $7,092.90 $20.60 $11,723.89 $900,001.00 to $901,000.00 $4,613.99 $7,098.45 $20.60 $11,733.04 $901,001.00 to $902,000.00 $4,617.60 $7,104.00 $20.60 $11,742.20 $902,001.00 to $903,000.00 $4,621.21 $7,109.55 $20.60 $11,751.36 $903,001.00 to $904,000.00 $4,624.82 $7,115.10 $20.60 $11,760.52 $904,001.00 to $905,000.00 $4,628.42 $7,120.65 $20.60 $11,769.67 $905,001.00 to $906,000.00 $4,632.03 $7,126.20 $20.60 $11,778.83 $906,001.00 to $907,000.00 $4,635.64 $7,131.75 $20.60 $11,787.99 $907,001.00 to $908,000.00 $4,639.25 $7,137.30 $20.60 $11,797.15 $908,001.00 to $909,000.00 $4,642.85 $7,142.85 $20.60 $11,806.30 $909,001.00 to $910,000.00 $4,646.46 $7,148.40 $20.60 $11,815.46 $910,001.00 to $911,000.00 $4,650.07 $7,153.95 $20.60 $11,824.62 $911,001.00 to $912,000.00 $4,653.68 $7,159.50 $20.60 $11,833.78 $912,001.00 to $913,000.00 $4,657.28 $7,165.05 $20.60 $11,842.93 $913,001.00 to $914,000.00 $4,660.89 $7,170.60 $20.60 $11,852.09 $914,001.00 to $915,000.00 $4,664.50 $7,176.15 $20.60 $11,861.25 $915,001.00 to $916,000.00 $4,668.11 $7,181.70 $20.60 $11,870.41 $916,001.00 to $917,000.00 $4,671.71 $7,187.25 $20.60 $11,879.56 $917,001.00 to $918,000.00 $4,675.32 $7,192.80 $20.60 $11,888.72 $918,001.00 to $919,000.00 $4,678.93 $7,198.35 $20.60 $11,897.88 $919,001.00 to $920,000.00 $4,682.54 $7,203.90 $20.60 $11,907.04 $920,001.00 to $921,000.00 $4,686.14 $7,209.45 $20.60 $11,916.19 $921,001.00 to $922,000.00 $4,689.75 $7,215.00 $20.60 $11,925.35 $922,001.00 to $923,000.00 $4,693.36 $7,220.55 $20.60 $11,934.51 $923,001.00 to $924,000.00 $4,696.97 $7,226.10 $20.60 $11,943.67 $924,001.00 to $925,000.00 $4,700.57 $7,231.65 $20.60 $11,952.82 Effective October 20, 2025
57 EXHIBIT A

Page 197 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$925,001.00 to $926,000.00 $4,704.18 $7,237.20 $20.60 $11,961.98 $926,001.00 to $927,000.00 $4,707.79 $7,242.75 $20.60 $11,971.14 $927,001.00 to $928,000.00 $4,711.40 $7,248.30 $20.60 $11,980.30 $928,001.00 to $929,000.00 $4,715.00 $7,253.85 $20.60 $11,989.45 $929,001.00 to $930,000.00 $4,718.61 $7,259.40 $20.60 $11,998.61 $930,001.00 to $931,000.00 $4,722.22 $7,264.95 $20.60 $12,007.77 $931,001.00 to $932,000.00 $4,725.83 $7,270.50 $20.60 $12,016.93 $932,001.00 to $933,000.00 $4,729.43 $7,276.05 $20.60 $12,026.08 $933,001.00 to $934,000.00 $4,733.04 $7,281.60 $20.60 $12,035.24 $934,001.00 to $935,000.00 $4,736.65 $7,287.15 $20.60 $12,044.40 $935,001.00 to $936,000.00 $4,740.26 $7,292.70 $20.60 $12,053.56 $936,001.00 to $937,000.00 $4,743.86 $7,298.25 $20.60 $12,062.71 $937,001.00 to $938,000.00 $4,747.47 $7,303.80 $20.60 $12,071.87 $938,001.00 to $939,000.00 $4,751.08 $7,309.35 $20.60 $12,081.03 $939,001.00 to $940,000.00 $4,754.69 $7,314.90 $20.60 $12,090.19 $940,001.00 to $941,000.00 $4,758.29 $7,320.45 $20.60 $12,099.34 $941,001.00 to $942,000.00 $4,761.90 $7,326.00 $20.60 $12,108.50 $942,001.00 to $943,000.00 $4,765.51 $7,331.55 $20.60 $12,117.66 $943,001.00 to $944,000.00 $4,769.12 $7,337.10 $20.60 $12,126.82 $944,001.00 to $945,000.00 $4,772.72 $7,342.65 $20.60 $12,135.97 $945,001.00 to $946,000.00 $4,776.33 $7,348.20 $20.60 $12,145.13 $946,001.00 to $947,000.00 $4,779.94 $7,353.75 $20.60 $12,154.29 $947,001.00 to $948,000.00 $4,783.55 $7,359.30 $20.60 $12,163.45 $948,001.00 to $949,000.00 $4,787.15 $7,364.85 $20.60 $12,172.60 $949,001.00 to $950,000.00 $4,790.76 $7,370.40 $20.60 $12,181.76 $950,001.00 to $951,000.00 $4,794.37 $7,375.95 $20.60 $12,190.92 $951,001.00 to $952,000.00 $4,797.98 $7,381.50 $20.60 $12,200.08 $952,001.00 to $953,000.00 $4,801.58 $7,387.05 $20.60 $12,209.23 $953,001.00 to $954,000.00 $4,805.19 $7,392.60 $20.60 $12,218.39 $954,001.00 to $955,000.00 $4,808.80 $7,398.15 $20.60 $12,227.55 $955,001.00 to $956,000.00 $4,812.41 $7,403.70 $20.60 $12,236.71 $956,001.00 to $957,000.00 $4,816.01 $7,409.25 $20.60 $12,245.86 $957,001.00 to $958,000.00 $4,819.62 $7,414.80 $20.60 $12,255.02 $958,001.00 to $959,000.00 $4,823.23 $7,420.35 $20.60 $12,264.18 $959,001.00 to $960,000.00 $4,826.84 $7,425.90 $20.60 $12,273.34 $960,001.00 to $961,000.00 $4,830.44 $7,431.45 $20.60 $12,282.49 $961,001.00 to $962,000.00 $4,834.05 $7,437.00 $20.60 $12,291.65 $962,001.00 to $963,000.00 $4,837.66 $7,442.55 $20.60 $12,300.81 $963,001.00 to $964,000.00 $4,841.27 $7,448.10 $20.60 $12,309.97 $964,001.00 to $965,000.00 $4,844.87 $7,453.65 $20.60 $12,319.12 $965,001.00 to $966,000.00 $4,848.48 $7,459.20 $20.60 $12,328.28 $966,001.00 to $967,000.00 $4,852.09 $7,464.75 $20.60 $12,337.44 $967,001.00 to $968,000.00 $4,855.70 $7,470.30 $20.60 $12,346.60 $968,001.00 to $969,000.00 $4,859.30 $7,475.85 $20.60 $12,355.75 $969,001.00 to $970,000.00 $4,862.91 $7,481.40 $20.60 $12,364.91 $970,001.00 to $971,000.00 $4,866.52 $7,486.95 $20.60 $12,374.07 $971,001.00 to $972,000.00 $4,870.13 $7,492.50 $20.60 $12,383.23 $972,001.00 to $973,000.00 $4,873.73 $7,498.05 $20.60 $12,392.38 $973,001.00 to $974,000.00 $4,877.34 $7,503.60 $20.60 $12,401.54 $974,001.00 to $975,000.00 $4,880.95 $7,509.15 $20.60 $12,410.70 $975,001.00 to $976,000.00 $4,884.56 $7,514.70 $20.60 $12,419.86 $976,001.00 to $977,000.00 $4,888.16 $7,520.25 $20.60 $12,429.01 $977,001.00 to $978,000.00 $4,891.77 $7,525.80 $20.60 $12,438.17 $978,001.00 to $979,000.00 $4,895.38 $7,531.35 $20.60 $12,447.33 $979,001.00 to $980,000.00 $4,898.99 $7,536.90 $20.60 $12,456.49 $980,001.00 to $981,000.00 $4,902.59 $7,542.45 $20.60 $12,465.64 $981,001.00 to $982,000.00 $4,906.20 $7,548.00 $20.60 $12,474.80 $982,001.00 to $983,000.00 $4,909.81 $7,553.55 $20.60 $12,483.96 $983,001.00 to $984,000.00 $4,913.42 $7,559.10 $20.60 $12,493.12 $984,001.00 to $985,000.00 $4,917.02 $7,564.65 $20.60 $12,502.27 $985,001.00 to $986,000.00 $4,920.63 $7,570.20 $20.60 $12,511.43 $986,001.00 to $987,000.00 $4,924.24 $7,575.75 $20.60 $12,520.59 $987,001.00 to $988,000.00 $4,927.85 $7,581.30 $20.60 $12,529.75 $988,001.00 to $989,000.00 $4,931.45 $7,586.85 $20.60 $12,538.90 $989,001.00 to $990,000.00 $4,935.06 $7,592.40 $20.60 $12,548.06 $990,001.00 to $991,000.00 $4,938.67 $7,597.95 $20.60 $12,557.22 $991,001.00 to $992,000.00 $4,942.28 $7,603.50 $20.60 $12,566.38 $992,001.00 to $993,000.00 $4,945.88 $7,609.05 $20.60 $12,575.53 $993,001.00 to $994,000.00 $4,949.49 $7,614.60 $20.60 $12,584.69 $994,001.00 to $995,000.00 $4,953.10 $7,620.15 $20.60 $12,593.85 $995,001.00 to $996,000.00 $4,956.71 $7,625.70 $20.60 $12,603.01 Effective October 20, 2025
58 EXHIBIT A

Page 198 ends

City of Fountain Valley FY 2025-2026 Fee Schedule
Plan Check
Fees 65%
Inspection
Fees
Permit
Issuance
Fees
Total
Fees
Total Valuation

BUILDING
$996,001.00 to $997,000.00 $4,960.31 $7,631.25 $20.60 $12,612.16 $997,001.00 to $998,000.00 $4,963.92 $7,636.80 $20.60 $12,621.32 $998,001.00 to $999,000.00 $4,967.53 $7,642.35 $20.60 $12,630.48 $999,001.00 to $1,000,000.00 $4,971.14 $7,647.90 $20.60 $12,639.64 $ 1,000,001 AND OVER:

Inspection fee is $7,665.25 for the first $1,000,001.00 plus $2.15 for each additional $1,000.00 thereafter.

Repeat Plan Check submitted within 12 months of original, located in the same tract and using approved plans, will receive a 75% discount on plan check, provided there is no change in building codes.

Effective October 20, 2025
59 EXHIBIT A

Page 199 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: August 19, 2025
Members of the City Council
SUBJECT: Accept the bids and award a construction contract to Trueline Construction & Surfacing, Inc. for the Pickleball Courts Conversion and Resurfacing Project, Project No. 25018, in the amount not-to-exceed $118,835.

Three-Year Strategic Goals
☒ Enhance the culture and environment of “A Nice Place to Live” ☐ Achieve fiscal stability by evaluating processes, and attract and retain revenue producing businesses/opportunities
☐ Attract and retain quality staff through best practices and trends ☒ Maintain, build, and modernize infrastructure to support growth and future needs of the City
☐ Not applicable

EXECUTIVE SUMMARY
Staff recommends that the City Council accept the bids and award a construction contract to Trueline Construction & Surfacing, Inc. for the Pickleball Courts Conversion and Resurfacing Project in the amount not-to-exceed $118,835. Staff also intends to administratively issue a Purchase Order to Bureau Veritas North America, Inc., for an On-Call Construction Inspection Services contract in the amount not-to-exceed $17,000.

Construction of this project is funded by the Government Building Internal Service Fund (General Fund). There is adequate funding within the FY2025/2026 Adopted Budget.

DISCUSSION:

The City owns and maintains various sports courts across the Fountain Valley Sports Park, Recreation Center, and several neighborhood parks. Residents and visitors regularly use these courts for rentals and open play, and as such, they require resurfacing and general maintenance approximately every five (5) years.

As part of this ongoing upkeep, three (3) tennis courts at the Fountain Valley Sports Park, which currently double as non-permanent pickleball courts, are scheduled for resurfacing.

Rather than simply resurface these three (3) courts, the Recreation Department has decided to convert them to permanent pickleball courts (see Attachment 2). This conversion will increase the number of permanent pickleball courts to 16, meeting the minimum court

Page 200 ends

Pickleball Courts Conversion and Resurfacing Project – Trueline Construction & Surfacing, Inc.

August 19, 2025

Page 2 ends

requirements set by the Professional Pickleball Association (PPA) to begin hosting professional tournaments.

In addition to these new permanent pickleball courts, the project’s scope of work will also include the resurfacing of the four (4) existing permanent pickleball courts and two (2) practice tennis courts, aligning all courts with the City’s 5-year maintenance cycle.

PROCUREMENT
On June 22, 2025, the City publicly advertised Request for Bid (RFB) No. 25-003, Pickleball Courts Conversion and Resurfacing Project, Project 25018. On July 11, 2025, the City received three (3) bids. The lowest responsible and responsive bidder, Trueline Construction & Surfacing, Inc., submitted a bid in the amount of $118,835, in accordance with the City requirements and purchasing policies.

Contractor Total Bid Amount

1. Trueline Construction & Surfacing, Inc. $118,835.00

2. Dash Construction Company, Inc. $122,200.00

3. Elegant Construction, Inc. $350,000.00
Engineer’s Estimate: $90,000
Trueline Construction & Surfacing, Inc. has completed similar projects for other Southern California municipalities, including two (2) previous projects for the City of Fountain Valley. On October 16, 2012, and May 14, 2019, the City Council approved the award of construction contracts to Trueline for court resurfacing projects with similar scopes. Both projects were completed on time and within budget.

Construction Inspection Services
City staff solicited and received proposals from Bureau Veritas North America, Inc., TKE Engineering, Inc., and Willdan Engineering from the City’s On-Call consultant list for inspection services. The proposal cost and inspection hours are listed on the table below.

Consultant Inspection Hours Proposed Cost
Bureau Veritas North America, Inc. 147 $17,000
TKE Engineering, Inc. 125 $17,000
Willdan Engineering 106 $16,854
After evaluating the three (3) submitted proposals, Bureau Veritas North America, Inc. was determined to be the most qualified firm based upon previous project experience, while also offering the highest amount of inspection hours based upon the project budget of $17,000.

Bureau Veritas North America, Inc. is a reputable civil engineering, construction management (CM), and inspection services firm. They are well-versed in the scope of the work and have the necessary experience to successfully provide inspection services for the project. As such, the staff intends to administratively issue a Purchase Order to Bureau Veritas North America, Inc. in the amount of $17,000.

Page 201 ends

Pickleball Courts Conversion and Resurfacing Project – Trueline Construction & Surfacing, Inc.

August 19, 2025

Page 3 ends

FISCAL REVIEW
The current proposed FY2025/2026 budget includes sufficient funding for this project. The budget allocations and project expenses/costs are as follows:

Project Funding Source
Government Building Internal Service Fund (General Fund) $150,000.00 Total Budget $150,000.00
Project Budget Allocations for Project No. 25018
Construction (Trueline Construction & Surfacing, Inc.) $118,835.00 10% Contingency $11,882.00
On-Call Construction Inspection Services (Bureau Veritas North America, Inc.)* $17,000.00
Project Plans and Bid Documents Printing Costs $310.00
Total Project Cost $148,027.00
*Purchase Orders to be issued administratively
Note that, as in all of the City’s Public Works contracts, the contract itself provides the Director of Public Works authority to issue change orders of up to 10% of the original contract amount. When the Council approves the contract, it approves this authority. Ten percent is generally considered within the normal range of changed conditions on a Public Works construction project and, by providing change order authority upfront, Council helps to reduce the possibility of delay damages that could be incurred when a contractor must stop work and wait for authorization to proceed.

PUBLIC NOTIFICATION
Not applicable.

ENVIRONMENTAL IMPACT REVIEW
Not applicable.

ATTORNEY REVIEW
The Attorney for the City has reviewed and approved the Trueline Construction & Surfacing, Inc. contract for Project No. 25018 construction. The Attorney for the City has also reviewed and approved the Bureau Veritas North America, Inc. (CON 1541) for construction inspection services.

ALTERNATIVES
Alternative No. 1: Accept the bids and award a construction contract to Trueline Construction & Surfacing, Inc. for the Pickleball Courts Conversion and Resurfacing Project in the amount not to exceed $118,835.00.

Alternative No. 2: Reject all bids and do not move forward with the award of a contract.

This is not the recommended alternative as the bids received are competitive bids and Trueline Construction & Surfacing, Inc. is a reputable contractor that has completed many similar resurfacing projects throughout Southern California. Moving forward with this project will prevent further degradation of the courts.

Page 202 ends

Pickleball Courts Conversion and Resurfacing Project – Trueline Construction & Surfacing, Inc.

August 19, 2025

Page 4 ends

RECOMMENDATION
It is recommended that the City Council approve Alternative No. 1, which is to:

Accept the bids and award a construction contract to Trueline Construction & Surfacing, Inc. for the Pickleball Courts Conversion and Resurfacing Project, in the amount not-toexceed $118,835.00.

Prepared by: Ryan Damon, Assistant Engineer
Recommended by: Kyle Hilton, Associate Engineer
Reviewed by: Temo Galvez, P.E., Deputy Public Works Director / City Engineer
Approved by: Scott Smith, P.E., Director of Public Works Fiscal Review by: Ryan Smith, Finance Director / City Treasurer Approved by: Maggie Le, City Manager
Attachment 1: Trueline Construction & Surfacing Public Works Construction Contract Attachment 2: Sports Park Tennis Center Exhibit

Page 203 ends

Attachment #1

Page 204 ends
Page 205 ends
Page 206 ends
Page 207 ends
Page 208 ends
Page 209 ends
Page 210 ends
Page 211 ends
Page 212 ends
Page 213 ends
Page 214 ends
Page 215 ends
Page 216 ends
Page 217 ends
Page 218 ends
Page 219 ends
Page 220 ends
Page 221 ends

SPORT PARK TENNIS CENTER
16400BROOKHURSTSTREET
50 100

I I I I I
Feet

AREA OF WORK
Attachment #2

Page 222 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: August 19, 2025
Members of the City Council
SUBJECT: Approve the City to utilize the Orange County Master Purchase Agreement (contract MA-080-25011708) and award a contract to G2 Construction, Inc., in the amount of $491,164 for the installation of Full Capture System (FCS) devices into the City’s storm drain inlets.

Three-Year Strategic Goals
☒ Enhance the culture and environment of “A Nice Place to Live” ☐ Achieve fiscal stability by evaluating processes, and attract and retain revenue producing businesses/opportunities
☐ Attract and retain quality staff through best practices and trends ☒ Maintain, build, and modernize infrastructure to support growth and future needs of the City
☐ Not applicable

EXECUTIVE SUMMARY
On October 14, 2024, the City of Fountain Valley received approval for Orange County Transportation Authority (OCTA) Measure M2 Tier 1 Environmental Cleanup Program (ECP) grant funding. The grant funds will help the City to maximize resources and reduce expenditures for installing Full Capture System (FCS) devices into City storm drain inlets, which are necessary to meet the Statewide Trash Amendments mandate.

The County of Orange (County) established Master Purchase Agreements to generate strategic savings opportunities for cities to maximize the use of Tier 1 Grant funding. Therefore, to take advantage of discounted pricing, City staff recommend piggybacking on a County Master Purchase Agreement to award a $491,164 contract to G2 Construction, Inc. for the installation of 330 FCS devices.

DISCUSSION
On April 7, 2015, the California State Water Resources Control Board (SWRCB) adopted the “Trash Amendments” to the Water Quality Control Plan for Ocean Waters of California to address significant trash pollution. Permittees (municipalities) were required to select one of the two options (Track 1 or Track 2), to capture trash before it gets in the waterways and submit

Page 223 ends

Approve the City to utilize the County Master Purchase Agreement and award a Contract to G2 Construction, Inc for the installation of Full Capture System Devices.

August 19, 2025

Page 2 ends

their choice to the SWRCB by September 2, 2017. The City selected Track 1, which requires permittees to install, maintain, and operate FCS devices in storm drains to capture trash in the urban runoff from the Priority Land Uses (PLUs). PLUs are defined by the State Water Boards as commercial, industrial mixed urban, high density residential and transportation-related land uses. The City is installing FCS devices to help prevent transportation-generated pollutants from entering the City’s stormwater system, thus meeting the Trash Amendments requirement of screening out greater than five (5) millimeter sized trash flowing from the PLU areas. The City must fully comply with the Trash Amendments by December 2, 2030.

To assist local compliance with the Trash Amendments, OCTA has made funding available through the Measure M2 ECP Tier 1 grant program. Program funds are allocated on a countywide competitive basis to assist jurisdictions in meeting the Clean Water Act requirements for projects that support water quality improvements related to the transportation infrastructure.

The City applied and was approved to receive OCTA Measure M2 Tier 1 ECP grant funding.

The grant funding helps the City maximize resources and reduce expenditures towards meeting the State Trash Amendments. The project will install 330 FCS devices into the City’s storm drain inlets. The catch basin locations were selected based on the findings of drainage delineation calculations and Geographic Information System (GIS) analysis to identify PLUs with contributing drainage runoff to the catch basins. The grant requires all awarded jurisdictions to use the funding by December 2025. The City is required to retrofit 100% of the PLUs catch basins with FCS devices by December 2, 2030.

Through a competitive bidding and award process, G2 Construction, Inc. (G2) entered into a Master Agreement with the County. G2 has been placed on a list of pre-approved contractors that cities can use for their projects which are associated with OCTA M2 Tier 1 ECP grant funds. The intent of the County’s Master Agreement is to offer strategic savings through economies of scale for Tier 1 grant fund recipients. Cites are eligible to piggyback on G2’s Master Agreement with the County. Neighboring cities such as Placentia, San Juan Capistrano, Seal Beach, and Laguna Niguel have utilized the master agreement to install their required trash capture devices.

The proposed scope of work consists of the purchase and installation of 330 FCS Devices in catch basins within the City. Construction is anticipated to start in September 2025 with a projected project completion by the end of December 2025. Staff would notify impacted residents and businesses of upcoming project construction and potential impacts.

FISCAL REVIEW
The total project cost is $491,164. OCTA has approved grant funding for 80% of the total project cost, which is $392,931. The remaining $98,233 (20%) is the City’s match obligation. The Fiscal Year 2025-2026 Adopted Capital Improvement Plan Budget identifies funding for this project through the Measure M2 Fund (80%) and the Solid Waste Fund (20%). The Grant requires all awarded jurisdictions to use funding by December 2025.

Page 224 ends

Approve the City to utilize the County Master Purchase Agreement and award a Contract to G2 Construction, Inc for the installation of Full Capture System Devices.

August 19, 2025

Page 3 ends

PUBLIC NOTIFICATION
Not applicable

ATTORNEY REVIEW
The Attorney for the City has reviewed and approved the contract.

ALTERNATIVES
Alternative No. 1: Staff recommends that the City utilize the Orange County Master Purchase Agreement (contract MA-080-25011708) and award a contract to G2 Construction, Inc., in an amount of $491,164 for the installation of Full Capture System Devices into the City’s storm drain inlets.

Alternative No. 2: Do not approve the City to utilize the County Master Purchase Agreement and direct staff to separately bid on the project.

This alternative is not recommended because the pricing for an independently bid project will not be as competitive as the countywide pricing, and the City will not be able to maximize the use of OCTA’s grant funding. Maximizing the number of installations aids in compliance with the Statewide Trash Amendments mandate.

RECOMMENDATION
It is recommended that the City Council approve the City to utilize the Orange County Master Purchase Agreement (contract MA-080-25011708) and award a Contract to G2 Construction, Inc., in the amount of $491,164 for the installation of Full Capture System devices into the City’s storm drain inlets.

Prepared by: Lia Gountoumas, Environmental Services Administrator Approved by: Scott Smith, P.E., Director of Public Works Fiscal Review by: Ryan Smith, Finance Director / City Treasurer Approved by: Maggie Le, City Manager
Attachment 1: City of Fountain Valley Agreement with G2 Construction, Inc.

Attachment 2: Members for Board of Directors – OCTA M2 ECP Tier 1 Letter of Approval

Page 225 ends

CONTRACT
CON-___-___
This AGREEMENT is made and entered into this 19th day of August 2025, by and between the City of Fountain Valley, a municipal corporation (“City”) and G2 Construction, Inc., (“Contractor”).

WHEREAS, Section 2.36.070(a)(5) of the Fountain Valley Municipal Code permits the City to make purchases under the purchasing contracts of other governmental agencies when authorized to do so by a resolution; and
WHEREAS, the City requires Trash and Debris Capture Devices; and WHEREAS, after a competitive procurement process, G2 Construction, Inc. entered into a contract with the County of Orange, California for Trash and Debris Capture Devices, Contract No. MA-080-25011708 (“County of Orange Contract”); and WHEREAS, the City’s participation in the County of Orange Contract will facilitate the City’s ability to provide Trash and Debris Capture Devices; and, NOW, THEREFORE, in consideration of the mutual terms, covenants, and conditions in this AGREEMENT, the parties agree as follows:

1. The County of Orange Contract with Contractor, attached hereto as Exhibit “A,” is incorporated by this reference as if fully set forth, and the same terms and conditions contained in the County of Orange Contract shall be applicable here except as follows:

A. Wherever the County of Orange Contract refers to the County of Orange, California, it shall be deemed to refer to the City of Fountain Valley, California;
B.Contractor shall provide trash and debris capture devices, of the same type and kind identified in the County of Orange Contract except as modified by mutual agreement of the City and G2 Construction, Inc. in an amount not-to-exceed Four Hundred Ninety-One Thousand, One Hundred Sixty-Four Dollars ($491,164.00).

C. To the extent that the County of Orange Contract and this Agreement are inconsistent, the following priority shall govern: (1) this Agreement and (2) the County of Orange Contract.

D. Payment for the trash and debris capture devices purchased by the City shall be made by the City on delivery to and acceptance of the services by the City and submittal of an invoice to the City. Payment is due thirty (30) days after the date of the invoice.

E. The term of this AGREEMENT shall commence on August 19, 2025, and shall terminate on December 31, 2025, or unless sooner terminated as provided in this AGREEMENT.

Page 226 ends

F. All warranties shall accrue to the City of Fountain Valley.

2. Neither this AGREEMENT nor any money that becomes due to Contractor under this AGREEMENT may be assigned by Contractor without the prior written consent of the City Manager or their designee.

3. Any notice given under this AGREEMENT shall be in writing and personally delivered or deposited in the U.S. Postal Service, return receipt, and shall be delivered or mailed to Contractor at 1352 E. Borchard Ave., Santa Ana, CA 92705 Attn: Eric Taylor, and to the City at 10200 Slater Avenue, Fountain Valley, CA 92708 Attn: City Manager. Notice shall be deemed given three (3) days after deposit in the mail.

4. The G2 Construction Proposal including the scope of work and cost for services, attached hereto as Exhibit “B”, is incorporated by this reference as if fully set forth.

5. The terms appearing on the County of Orange Contract are incorporated in this AGREEMENT.

6. This AGREEMENT and all documents which are incorporated by reference in this AGREEMENT constitute the entire understanding between the parties and supersede all other agreements, oral or written, with respect to the subject matter of this AGREEMENT.
///
///
///
///
///
///

Page 227 ends
Page 228 ends

EXHIBIT A

Page 229 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 1 of 35 ends

File No. 2736403
Contract MA-080-25011708
For
Trash and Debris Capture Devices
Between
County of Orange
And
G2 Construction Inc.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 230 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 2 of 35 ends

File No. 2736403

CONTRACT
MA-080-25011708

BETWEEN

COUNTY OF ORANGE
AND
G2 CONSTRUCTION INC.

FOR

TRASH AND DEBRIS CAPTURE DEVICES
This Aggregate Contract MA-080-25011708 for Trash and Debris Capture Devices (Contract) is made and entered into as of the date fully executed by and between the County of Orange, a political subdivision of the State of California (“County”), and G2 Construction Inc., a California Corporation (Contractor), with County and Contractor sometimes referred to as Party or collectively as Parties.

ATTACHMENTS
This Contract is comprised of this document and the following Attachments, which are attached hereto and incorporated by reference into this Contract:

Attachment A – Scope of Work
Attachment B – Payment and Compensation

RECITALS
WHEREAS, Contractor and County are entering into this Contract for Trash and Debris Capture Devices under a usage Contract; and,
WHEREAS, County solicited Contract for Trash and Debris Capture Devices as set forth herein, and Contractor represented that it is qualified to provide Trash and Debris Capture Devices to the County as further set forth here; and,
WHEREAS, Contractor agrees to provide Trash and Debris Capture Devices to the County as further set forth in the Scope of Work, attached hereto as Attachment A; and, WHEREAS, County agrees to pay Contractor based on the schedule of fees set forth in Payment/Compensation, attached hereto as Attachment B; and, NOW, THEREFORE, the Parties mutually agree as follows:

ARTICLES

GENERAL TERMS AND CONDITIONS

1. Governing Law and Venue:

This Contract has been negotiated and executed in the state of California and shall be governed by and construed under the laws of the state of California. In the event of any legal action to enforce or interpret this Contract, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California, and the parties hereto agree to and do hereby submit to the jurisdiction of such court, Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 231 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 3 of 35 ends

File No. 2736403
notwithstanding Code of Civil Procedure Section 394. Furthermore, the parties specifically agree to waive any and all rights to request that an action be transferred for adjudication to another county.

2. Entire Contract:

This Contract and its Attachments contains the entire Contract between the parties with respect to the matters herein, and there are no restrictions, promises, warranties or undertakings other than those set forth herein or referred to herein. No exceptions, alternatives, substitutes or revisions are valid or binding on County unless authorized by County in writing. Electronic acceptance of any additional terms, conditions or supplemental Contracts by any County employee or agent, including but not limited to installers of software, shall not be valid or binding on County unless accepted in writing by County’s Purchasing Agent or designee.

3. Amendments:

No alteration or variation of the terms of this Contract shall be valid unless made in writing and signed by the parties; no oral understanding or agreement not incorporated herein shall be binding on either of the parties; and no exceptions, alternatives, substitutes or revisions are valid or binding on County unless authorized by County in writing.

4. Taxes:

Unless otherwise provided herein or by law, price quoted does not include California state sales or use tax. Out-of-state Contractors shall indicate California Board of Equalization permit number and sales permit number on invoices, if California sales tax is added and collectable. If no permit numbers are shown, sales tax will be deducted from payment. The Auditor-Controller will then pay use tax directly to the State of California in lieu of payment of sales tax to Contractor.

5. Delivery:

Time of delivery of commodities and services is of the essence in this Contract. County reserves the right to refuse any commodities and services and to cancel all or any part of the commodities not conforming to applicable specifications, drawings, samples or descriptions or services that do not conform to the prescribed scope of work. Acceptance of any part of the order for commodities shall not bind County to accept future shipments nor deprive it of the right to return commodities already accepted at Contractor’s expense. Over shipments and under shipments of commodities shall be only as agreed to in writing by County. Delivery shall not be deemed to be complete until all commodities or services have actually been received and accepted in writing by County.

6. Acceptance Payment:

Unless otherwise agreed to in writing by County, 1) acceptance shall not be deemed complete unless in writing and until all the commodities/services have actually been received, inspected, and tested to the satisfaction of County, and 2) payment shall be made in arrears after satisfactory acceptance.

7. Warranty:

Contractor expressly warrants that the commodities covered by this Contract are 1) free of liens or encumbrances, 2) merchantable and good for the ordinary purposes for which they are used, and 3) fit for the particular purpose for which they are intended. Acceptance of this order shall constitute an agreement Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 232 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 4 of 35 ends

File No. 2736403
upon Contractor’s part to indemnify, defend and hold County and its indemnities as identified in the Insurance and Indemnification section, and as more fully described in the Insurance and Indemnification section harmless from liability, loss, damage and expense, including reasonable counsel fees, incurred or sustained by County by reason of the failure of the goods/services to conform to such warranties, faulty work performance, negligent or unlawful acts, and non-compliance with any applicable state or federal codes, ordinances, orders, or statutes, including the Occupational Safety and Health Act (OSHA) and the California Industrial Safety Act. Such remedies shall be in addition to any other remedies provided by law.

8. Patent/Copyright Materials/Proprietary Infringement:

Unless otherwise expressly provided in this Contract, Contractor shall be solely responsible for clearing the right to use any patented or copyrighted materials in the performance of this Contract. Contractor warrants that any software as modified through services provided hereunder will not infringe upon or violate any patent, proprietary right, or trade secret right of any third party. Contractor agrees that, in accordance with the more specific requirement contained in the Insurance and Indemnification section, it shall indemnify, defend and hold County and County Indemnitees harmless from any and all such claims and be responsible for payment of all costs, damages, penalties and expenses related to or arising from such claim(s), including, costs and expenses but not including attorney’s fees.

9. Assignment:

The terms, covenants, and conditions contained herein shall apply to and bind the heirs, successors, executors, administrators and assigns of the parties. Furthermore, neither the performance of this Contract nor any portion thereof may be assigned by Contractor without the express written consent of County. Any attempt by Contractor to assign the performance or any portion thereof of this Contract without the express written consent of County shall be invalid and shall constitute a breach of this Contract.

10. Non-Discrimination:

In the performance of this Contract, Contractor agrees that it will comply with the requirements of Section 1735 of the California Labor Code and not engage nor permit any subcontractors to engage in discrimination in employment of persons because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, or sex of such persons. Contractor acknowledges that a violation of this provision shall subject Contractor to penalties pursuant to Section 1741 of the California Labor Code.

11. Termination:

In addition to any other remedies or rights it may have by law, County has the right to immediately terminate this Contract without penalty for cause or after 30 days’ written notice without cause, unless otherwise specified. Cause shall be defined as any material breach of contract, any misrepresentation or fraud on the part of Contractor. Exercise by County of its right to terminate Contract shall relieve County of all further obligation.

12. Consent to Breach Not Waiver:

No term or provision of this Contract shall be deemed waived and no breach excused, unless such waiver or consent shall be in writing and signed by the party claimed to have waived or consented. Any consent Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 233 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 5 of 35 ends

File No. 2736403
by any party to, or waiver of, a breach by the other, whether express or implied, shall not constitute consent to, waiver of, or excuse for any other different or subsequent breach.

13. Independent Contractor:

Contractor shall be considered an independent contractor and neither Contractor, its employees, nor anyone working under Contractor shall be considered an agent or an employee of County. Neither Contractor, its employees nor anyone working under Contractor shall qualify for workers’ compensation or other fringe benefits of any kind through County.

14. Performance Warranty:

Contractor shall warrant all work under this Contract, taking necessary steps and precautions to perform the work to County’s satisfaction. Contractor shall be responsible for the professional quality, technical assurance, timely completion and coordination of all documentation and other commodities/services furnished by Contractor under this Contract. Contractor shall perform all work diligently, carefully, and in a good and workmanlike manner; shall furnish all necessary labor, supervision, machinery, equipment, materials, and supplies, shall at its sole expense obtain and maintain all permits and licenses required by public authorities, including those of County required in its governmental capacity, in connection with performance of the work. If permitted to subcontract, Contractor shall be fully responsible for all work performed by subcontractors.

15. Changes:

Contractor shall make no changes in the work or perform any additional work without County’s specific written approval.

16. Change of Ownership/Name, Litigation Status, Conflicts with County Interests:

Contractor agrees that if there is a change or transfer in ownership of Contractor’s business prior to completion of this Contract, and the County agrees to an assignment of the Contract, the new owners shall be required under terms of sale or other transfer to assume Contractor’s duties and obligations contained in this Contract and complete them to the satisfaction of the County.

Notwithstanding other notice or termination provisions contained herein, County reserves the right to immediately terminate the Contract, as of the date on which the County provides written determination of termination of the Contract under this provision anytime upon or after assignment, in the event that the County determines that the assignee is not qualified or is otherwise unacceptable to the County for the provision of services or products under the Contract. . In the event of an immediate termination under this provision, the Contractor shall promptly refund the County an amount equal to the pro rata portion of any charges the County paid in advance for any remaining portion of the Contract after the date of termination. Likewise, the County shall not be liable for payment for any remaining services under the Contract after the date of termination for any payments to be made in arrears pursuant to the terms of the Contract.

17. Force Majeure:

Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 234 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 6 of 35 ends

File No. 2736403
notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

18. Confidentiality:

Contractor agrees to maintain the confidentiality of all County and County-related records and information pursuant to all statutory laws relating to privacy and confidentiality that currently exist or exist at any time during the term of this Contract. All such records and information shall be considered confidential and kept confidential by Contractor and Contractor’s staff, agents and employees.

19. Compliance with Laws:

Contractor represents and warrants that services to be provided under this Contract shall fully comply, at Contractor’s expense, with all standards, laws, statutes, restrictions, ordinances, requirements, and regulations (collectively “laws”), including, but not limited to those issued by County in its governmental capacity and all other laws applicable to the services at the time services are provided to and accepted by County. Contractor acknowledges that County is relying on Contractor to ensure such compliance, and pursuant to the requirements of the Insurance and Indemnification section, Contractor agrees that it shall defend, indemnify and hold County and County Indemnitees harmless from all liability, damages, costs and expenses arising from or related to a violation of such laws.

20. Freight:

Prior to County’s express acceptance of delivery of products. Contractor assumes full responsibility for all transportation, transportation scheduling, packing, handling, insurance, and other services associated with delivery of all products deemed necessary under Contract.

21. Severability:

If any term, covenant, condition or provision of this Contract is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the provisions hereof shall remain in full force and effect and shall in no way be affected, impaired or invalidated thereby.

22. Attorney Fees:

In any action or proceeding to enforce or interpret any provision of this Contract, each party shall bear their own attorney’s fees, costs and expenses.

23. Interpretation:

This Contract has been negotiated at arm’s length and between persons sophisticated and knowledgeable in the matters dealt with in this Contract. In addition, each party had been represented by experienced and knowledgeable independent legal counsel of their own choosing or has knowingly declined to seek such counsel despite being encouraged and given the opportunity to do so. Each party further acknowledges that they have not been influenced to any extent whatsoever in executing this Contract by any other party hereto or by any person representing them, or both. Accordingly, any rule or law (including California Civil Code Section 1654) or legal decision that would require interpretation of any ambiguities in this Contract against the party that has drafted it is not applicable and is waived. The provisions of this Contract shall be interpreted in a reasonable manner to effect the purpose of the parties and this Contract.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 235 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 7 of 35 ends

File No. 2736403

24. Employee Eligibility Verification:

Contractor warrants that it fully complies with all Federal and State statutes and regulations regarding the employment of aliens and others and that all its employees performing work under this Contract meet the citizenship or alien status requirement set forth in Federal statutes and regulations. Contractor shall obtain, from all employees performing work hereunder, all verification and other documentation of employment eligibility status required by Federal or State statutes and regulations including, but not limited to, the Immigration Reform and Control Act of 1986, 8 U.S.C. §1324 et seq., as they currently exist and as they may be hereafter amended. Contractor shall retain all such documentation for all covered employees for the period prescribed by the law. Contractor shall indemnify, defend with counsel approved in writing by County, and hold harmless, County, its agents, officers, and employees from employer sanctions and any other liability which may be assessed against Contractor or County or both in connection with any alleged violation of any Federal or State statutes or regulations pertaining to the eligibility for employment of any persons performing work under this Contract.

25. Audits/Inspections:

Contractor agrees to permit County’s Auditor-Controller or the Auditor-Controller’s authorized representative (including auditors from a private auditing firm hired by County) access during normal working hours to all books, accounts, records, reports, files, financial records, supporting documentation, including payroll and accounts payable/receivable records, and other papers or property of Contractor for the purpose of auditing or inspecting any aspect of performance under this Contract. The inspection and/or audit will be confined to those matters connected with the performance of Contract including, but not limited to, the costs of administering Contract. County will provide reasonable notice of such an audit or inspection.

County reserves the right to audit and verify Contractor’s records before final payment is made.

Contractor agrees to maintain such records for possible audit for a minimum of three years after final payment, unless a longer period of records retention is stipulated under this Contract or by law. Contractor agrees to allow interviews of any employees or others who might reasonably have information related to such records. Further, Contractor agrees to include a similar right to County to audit records and interview staff of any subcontractor related to performance of this Contract.

Should Contractor cease to exist as a legal entity, Contractor’s records pertaining to this Contract shall be forwarded to County’s project manager.

26. Contingency of Funds:

Contractor acknowledges that funding or portions of funding for this Contract may be contingent upon state budget approval; receipt of funds from, and/or obligation of funds by, the state of California to County; and inclusion of sufficient funding for the services hereunder in the budget approved by County’s Board of Supervisors for each fiscal year covered by this Contract. If such approval, funding or appropriations are not forthcoming, or are otherwise limited, County may immediately terminate or modify this Contract without penalty.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 236 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 8 of 35 ends

File No. 2736403

27. Expenditure Limit:

Contractor shall notify County of Orange assigned Deputy Purchasing Agent in writing when the expenditures against Contract reach 75 percent of the dollar limit on Contract. County will not be responsible for any expenditure overruns and will not pay for work exceeding the dollar limit on Contract unless a change order to cover those costs has been issued.

INDEMNIFICATION AND INSURANCE PROVISIONS

1. Indemnification
Contractor agrees to indemnify, defend with counsel approved in writing by County, and hold County, its elected and appointed officials, officers, employees, agents and those special districts and agencies which County’s Board of Supervisors acts as the governing Board (“County Indemnitees”) harmless from any claims, demands or liability of any kind or nature, including but not limited to personal injury or property damage, arising from or related to the services, products or other performance provided by Contractor pursuant to this Contract. If judgment is entered against Contractor and County by a court of competent jurisdiction because of the concurrent active negligence of County or County Indemnitees, Contractor and County agree that liability will be apportioned as determined by the court. Neither Party shall request a jury apportionment. Notwithstanding anything stated above, nothing contained herein shall relieve Contractor of any insurance requirements of obligations created elsewhere in this Contract.

2. General Insurance Requirements
Prior to the provision of services under this Contract, the Contractor agrees to carry all required insurance at Contractor’s expense, including all endorsements required herein, necessary to satisfy the County that the insurance provisions of this Contract have been complied with. Contractor agrees to keep such insurance coverage current, provide Certificates of Insurance, and endorsements to the County during the entire term of this Contract.

Contractor shall ensure that all subcontractors performing work on behalf of Contractor pursuant to this Contract shall be covered under Contractor’s insurance as an Additional Insured or maintain insurance subject to the same terms and conditions as set forth herein for Contractor. Contractor shall not allow subcontractors to work if subcontractors have less than the level of coverage required by County from Contractor under this Contract. It is the obligation of Contractor to provide notice of the insurance requirements to every subcontractor and to receive proof of insurance prior to allowing any subcontractor to begin work. Such proof of insurance must be maintained by Contractor through the entirety of this Contract for inspection by County representative(s) at any reasonable time.

All self-insured retentions (SIR)’s shall be clearly stated on the Certificate of Insurance. Any SIR in excess of Fifty Thousand Dollars $50,000 shall specifically be approved by the County’s Risk Manager, or designee. The County reserves the right to require current audited financial reports from Contractor. If Contractor is self-insured, Contractor will indemnify the County for any and all claims resulting or arising from Contractor’s services in accordance with the indemnity provision stated in this contract.

If the Contractor fails to maintain insurance acceptable to the County for the full term of this Contract, the County may terminate this Contract.

Qualified Insurer
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 237 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 9 of 35 ends

File No. 2736403
The policy or policies of insurance must be issued by an insurer with a minimum rating of A- (Secure A.M.

Best's Rating) and VIII (Financial Size Category as determined by the most current edition of the Best's Key Rating Guide/Property-Casualty/United States or ambest.com).

If the insurance carrier does not have an A.M. Best Rating of A-/VIII, the CEO/Office of Risk Management retains the right to approve or reject a carrier after a review of the company's performance and financial ratings.

The policy or policies of insurance maintained by the Contractor shall provide the minimum limits and coverage as set forth below.

Increased insurance limits may be satisfied with Excess/Umbrella policies. Excess/Umbrella policies when required must provide Follow Form coverage.

All insurance policies required by this Contract shall waive all rights of subrogation against the County of Orange, its elected and appointed officials, officers, employees, and agents when acting within the scope of their appointment or employment.

Contractor shall provide thirty (30) days prior written notice to the County of any policy cancellation or non-renewal and ten (10) days prior written notice where cancellation is due to non-payment of premium and provide a copy of the cancellation notice to County. Failure to provide written notice of cancellation may constitute a material breach of the Contract, upon which the County may suspend or terminate this Contract.

Insurance certificates should be forwarded to the agency/department address listed on the solicitation.

If the Contractor fails to provide the insurance certificates and endorsements within seven (7) days of notification by CEO/Purchasing or the agency/department purchasing division, award may be made to the next qualified vendor.

County expressly retains the right to require Contractor to increase or decrease insurance of any of the above insurance types throughout the term of this Contract. Any increase or decrease in insurance will be as deemed by County of Orange Risk Manager as appropriate to adequately protect County.

County shall notify Contractor in writing of changes in the insurance requirements. If Contractor does not provide acceptable Certificates of Insurance and endorsements to County incorporating such changes within thirty (30) days of receipt of such notice, this Contract may be in breach without further notice to Contractor, and County shall be entitled to all legal remedies.

The procuring of such required policy or policies of insurance shall not be construed to limit Contractor's liability hereunder nor to fulfill the indemnification provisions and requirements of this Contract, nor act in any way to reduce the policy coverage and limits available from the insurer.

3. Commercial General Liability
Including Products - Completed Operations
Minimum limits and coverage
$1,000,000 per occurrence; $2,000,000 aggregate
Required Coverage Forms
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 238 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 10 of 35 ends

File No. 2736403
The Commercial General Liability coverage shall be written on occurrence basis utilizing Insurance Services Office (ISO) form CG 00 01, or a substitute form providing liability coverage at least as broad.

Required Endorsements
The Commercial General Liability policy shall contain the following endorsements, which shall accompany the Certificate of Insurance:

A. An Additional Insured endorsement using ISO form CG 20 26 04 13, or a form at least as broad naming the County of Orange its elected and appointed officials, officers, employees, and agents as Additional Insureds, or provide blanket coverage, which will state As Required by Written Contract.

B. A primary non-contributory endorsement using ISO form CG 20 01 04 13, or a form at least as broad evidencing that the Contractor's insurance is primary, and any insurance or self-insurance maintained by the County shall be excess and non-contributing.

C. Products and Completed Operations endorsement using ISO Form CG 20 37 04 13, or a form at least as broad.

The Commercial General Liability policy shall contain a severability of interests clause also known as a “separation of insureds” clause (standard in the ISO CG 0001 policy).

4. Automobile Liability including coverage for owned, non-owned and hired vehicles Minimum limits and coverage
$1,000,000 combined Single Limit
Required Coverage Forms
The Business Auto Liability coverage shall be written on ISO form CA 00 01, CA 00 05, CA 0012, CA 00 20, or a substitute form providing coverage at least as broad.

5. Workers Compensation
Minimum limits and coverage
Statutory
Required Endorsements
The Workers’ Compensation policy shall contain a waiver of subrogation endorsement waiving all rights of subrogation against the County of Orange, its elected and appointed officials, officers, agents, and employees or provide blanket coverage, which will state As Required by Written Contract.

6. Employers Liability Insurance
Minimum limits and coverage
$1,000,000 per accident or disease
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 239 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 11 of 35 ends

File No. 2736403

ADDITIONAL TERMS AND CONDITIONS

1. Scope of Contract:

This Contract specifies contractual terms and conditions by which County will procure Trash and Debris Capture Devices from Contractor as further detailed in the Scope of Work, identified and incorporated herein by this reference as “Attachment A”.

2. Term of Contract:

This Contract shall commence upon execution of all necessary signatures and continue for five (5) calendar years from that date, unless otherwise terminated by County. This Contract may be renewed as set forth in the Article titled "Renewal" below.

3. Renewal:

This contract shall not be renewed unless otherwise approved by the County Board of Supervisors.

4. Aggregate Contract:

This is an Aggregate Contract with G2 Construction Inc. and United Storm Water, Inc. with an Aggregate Contract Amount not to exceed $25,000,000.

5. Adjustments – Scope of Work:

No adjustments made to the Scope of Work will be authorized without prior written approval of County assigned Deputy Purchasing Agent.

6. Bills and Liens:

Contractor shall pay promptly all indebtedness for labor, materials and equipment used in performance of the work. Contractor shall not permit any lien or charge to attach to the work or the premises, but if any does so attach, Contractor shall promptly procure its release and, in accordance with the requirements of Article “Indemnification” above, indemnify, defend, and hold County harmless and be responsible for payment of all costs, damages, penalties and expenses related to or arising from or related thereto.

7. Breach of Contract:

The failure of Contractor to comply with any of the provisions, covenants or conditions of this Contract shall be a material breach of this Contract. In such event County may, and in addition to any other remedies available at law, in equity, or otherwise specified in this Contract:
a. Terminate Contract immediately, pursuant to the General Terms and Conditions section, "Termination" Article herein;
b. Afford Contractor written notice of the breach and ten (10) calendar days or such shorter time that may be specified in this Contract within which to cure the breach; c. Discontinue payment to the Contactor for and during the period in which Contractor is in breach; and
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 240 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 12 of 35 ends

File No. 2736403
d. Offset against any monies billed by Contractor but yet unpaid by County those monies disallowed pursuant to the above.

8. Civil Rights:

Contractor attests that services provided shall be in accordance with the provisions of Title VI and Title VII of the Civil Rights Act of 1964, as amended, Section 504 of the Rehabilitation Act of 1973, as amended; the Age Discrimination Act of 1975 as amended; Title II of the Americans with Disabilities Act of 1990, and other applicable State and federal laws and regulations prohibiting discrimination on the basis of race, color, national origin, ethnic group identification, age, religion, marital status, sex or disability.

9. Conflict of Interest – Contractor’s Personnel:

Contractor shall exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict with the best interests of County. This obligation shall apply to Contractor; Contractor’s employees, agents, and subcontractors associated with accomplishing work and services hereunder.

Contractor’s efforts shall include, but not be limited to establishing precautions to prevent its employees, agents, and subcontractors from providing or offering gifts, entertainment, payments, loans or other considerations which could be deemed to influence or appear to influence County staff or elected officers from acting in the best interests of County.

10. Conflict of Interest – County Personnel:

County of Orange Board of Supervisors policy prohibits its employees from engaging in activities involving a conflict of interest. Contractor shall not, during the period of this Contract, employ any County employee for any purpose.

11. Contractor’s Project Manager and Key Personnel:

Contractor shall appoint a Project Manager to direct Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by County and shall not be changed without the written consent of County’s Project Manager, which consent shall not be unreasonably withheld.

Contractor’s Project Manager shall be assigned to this project for the duration of Contract and shall diligently pursue all work and services to meet the project time lines. County’s Project Manager shall have the right to require the removal and replacement of Contractor’s Project Manager from providing services to County under this Contract. County’s Project manager shall notify Contractor in writing of such action.

Contractor shall accomplish the removal within five (5) business days after written notice by County’s Project Manager. County’s Project Manager shall review and approve the appointment of the replacement for Contractor’s Project Manager. County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under Contract.

12. Contractor’s Expense:

The Contractor will be responsible for all costs related to photo copying, telephone communications, fax communications, and parking while on County sites during the performance of work and services under this Contract. The County will not provide free parking for any service in the County Civic Center.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 241 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 13 of 35 ends

File No. 2736403

13. Contractor Personnel – Uniform/Badges/Identification:

Contractor warrants that all persons employed to provide service under this Contract have satisfactory past work records indicating their ability to accept the kind of responsibility under this Contract. All Contractor’s employees shall be required to wear uniforms, badges, or other means of identification which are to be furnished by Contractor and must be work at all times while working on County property. The assigned Deputy Purchasing Agent must be notified in writing, within seven (7) days of notification of award of Contract of the uniform and/or badges and/or other identification to be worn by employees prior to beginning work and notified in writing seven (7) days prior to any changes in this procedure.

14. Contractor’s Records:

Contractor shall keep true and accurate accounts, records, books and data which shall correctly reflect the business transacted by Contractor in accordance with generally accepted accounting principles. These records shall be stored in Orange County for a period of three (3) years after final payment is received from County. Storage of records in another county will require written approval from County of Orange assigned Deputy Purchasing Agent.

15. Conditions Affecting Work:

Contractor shall be responsible for taking all steps reasonably necessary to ascertain the nature and location of the work to be performed under this Contract and to know the general conditions which can affect the work or the cost thereof. Any failure by Contractor to do so will not relieve Contractor from responsibility for successfully performing the work without additional cost to County. County assumes no responsibility for any understanding or representations concerning the nature, location(s) or general conditions made by any of its officers or agents prior to the execution of this Contract, unless such understanding or representations by County are expressly stated in Contract.

16. Cooperative Contract:

This Contract is a cooperative contract and may be utilized by all County of Orange departments.

The provisions and pricing of this Contract may be extended to any Municipal, County, Public Utility, Hospital, Educational Institution, or any other non-profit or governmental organization. Governmental entities wishing to use this contract will be responsible for issuing their own purchase documents / price agreements, providing for their own acceptance, and making any subsequent payments. Contractor shall be required to include in any Contract entered into with another agency or entity that is entered into as an extension of this Contract a Contract clause that will hold harmless the County of Orange from all claims, demands, actions or causes of actions of every kind resulting directly or indirectly, arising out of, or in any way connected with the use of this Contract. Failure to do so will be considered a material breach of this Contract and grounds for immediate Contract termination. The cooperative entities are responsible for obtaining all certificates of insurance and bonds required. The County of Orange makes no guarantee of usage by other users of this Contract.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 242 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 14 of 35 ends

File No. 2736403
A 2 percent rebate on Eligible Revenues will be paid to the County for any contracts the Contractor agrees to enter into with other entities under the provisions and pricing of this Contract. The Contractor shall provide quarterly Volume Sales Reports to the County about additional sales to other entities under the provisions and pricing of this Contract. The Reports shall include the ordering agency, detail of items sold including description, quantity, and price, and shall include all transactions pertaining to sales under the Contract provisions and pricing for that Reporting Period. Contractor shall provide the Volume Sales Reports regardless of whether or not any sales have been conducted. Failure of the Contractor to provide quarterly reports as required, may be deemed breach of the contract. A late penalty of 15 percent on the value of the rebate may be assessed to the Contractor for each month the payments are not received.

Subordinate contracts must be executed prior to the expiration or earlier termination of this Contract and may survive the expiration of this Contract up to a maximum of one year; however, in no case shall a subordinate contract exceed five (5) years in duration.

17. Data – Title To:

All materials, documents, data or information obtained from County data files or any County medium furnished to Contractor in the performance of this Contract will at all times remain the property of County.

Such data or information may not be used or copied for direct or indirect use by Contractor after completion or termination of this Contract without the express written consent of County. All materials, documents, data or information, including copies, must be returned to County at the end of this Contract.

18. Default – Re-Procurement Costs:

In case of Contract breach by Contractor, resulting in termination by County, County may procure the commodities and services from other sources. If the cost for those commodities and services is higher than under the terms of the existing Contract, Contractor will be responsible for paying County the difference between Contract cost and the price paid, and County may deduct this cost from any unpaid balance due Contractor. The price paid by County shall be the prevailing market price at the time such purchase is made.

This is in addition to any other remedies available under this Contract and under law.

19. Disputes – Contract:

The parties shall deal in good faith and attempt to resolve potential disputes informally. If the dispute concerning a question of fact arising under the terms of this Contract is not disposed of in a reasonable period of time by the Contractor’s Project Manager and the County‘s Project Manager, as specified in Article titled “Notices" below, such matter shall be brought to the attention of the County DPA by way of the following process:

A. The Contractor shall submit to the agency/department assigned Deputy Purchasing Agent a written demand for a final decision regarding the disposition of any dispute between the parties arising under, related to, or involving this Contract, unless County, on its own initiative, has already rendered such a final decision.

B. The Contractor’s written demand shall be fully supported by factual information, and, if such demand involves a cost adjustment to Contract, Contractor shall include with the demand a written statement signed by a senior official indicating that the demand is made in good faith, that the Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 243 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 15 of 35 ends

File No. 2736403
supporting data are accurate and complete, and that the amount requested accurately reflects Contract adjustment for which Contractor believes County is liable.

Pending the final resolution of any dispute arising under, related to, or involving this Contract, Contractor agrees to diligently proceed with the performance of this Contract, including the delivery of commodities and/or provision of services. Contractor’s failure to diligently proceed shall be considered a material breach of this Contract.

Any final decision of County shall be expressly identified as such, shall be in writing, and shall be signed by County Deputy Purchasing Agent or his designee. If County fails to render a decision within 90 days after receipt of Contractor’s demand, it shall be deemed a final decision adverse to Contractor’s contentions.

Nothing in this section shall be construed as affecting County’s right to terminate Contract for cause or termination for convenience as stated in Article "Termination" herein.

20. Drug-Free Workplace:

Contractor hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. Contractor will:

A. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by Government Code Section 8355(a)(1).

B. Establish a drug-free awareness program as required by Government Code Section 8355(a)(2) to inform employees about all of the following:

1. The dangers of drug abuse in the workplace;

2. The organization's policy of maintaining a drug-free workplace

3. Any available counseling, rehabilitation and employee assistance programs; and

4. Penalties that may be imposed upon employees for drug abuse violations.

C. Provide as required by Government Code Section 8355(a)(3) that every employee who works under this Contract:

1. Will receive a copy of the company's drug-free policy statement; and

2. Will agree to abide by the terms of the company's statement as a condition of employment under this Contract.

D. Failure to comply with these requirements may result in suspension of payments under Contract or termination of Contract or both, and Contractor may be ineligible for award of any future County contracts if County determines that any of the following has occurred:

1. Contractor has made false certification, or

2. Contractor violates the certification by failing to carry out the requirements as noted above.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 244 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 16 of 35 ends

File No. 2736403

21. EDD Independent Contractor Reporting Requirements:

Effective January 1, 2001, County of Orange is required to file in accordance with subdivision (a) of Section 6041A of the Internal Revenue Code for services received from a “service provider” to whom County pays $600 or more or with whom County enters into a contract for $600 or more within a single calendar year.

The purpose of this reporting requirement is to increase child support collection by helping to locate parents who are delinquent in their child support obligations.

The term “service provider” is defined in California Unemployment Insurance Code Section 1088.8, subparagraph B.2 as “an individual who is not an employee of the service recipient for California purposes and who received compensation or executes a contract for services performed for that service recipient within or without the state.” The term is further defined by the California Employment Development Department to refer specifically to independent Contractors. An independent Contractor is defined as “an individual who is not an employee of the ... government entity for California purposes and who receives compensation or executes a contract for services performed for that ... government entity either in or outside of California.”
The reporting requirement does not apply to corporations, general partnerships, limited liability partnerships, and limited liability companies.

Additional information on this reporting requirement can be found at the California Employment Development Department website located at http://www.edd.ca.gov/Employer_Services.htm

22. Emergency/Declared Disaster Requirements:

In the event of an emergency or if Orange County is declared a disaster area by County, state or federal government, Contract may be subjected to unusual usage. Contractor shall service County during such an emergency or declared disaster under the same terms and conditions that apply during nonemergency/disaster conditions. The pricing quoted by Contractor shall apply to serving County’s needs regardless of the circumstances. If Contractor is unable to supply the goods/services under the terms of Contract, then Contractor shall provide proof of such disruption and a copy of the invoice for the goods/services from Contractor’s supplier(s). Additional profit margin as a result of supplying goods/services during an emergency or a declared disaster shall not be permitted. In the event of an emergency or declared disaster, emergency purchase order numbers will be assigned. All applicable invoices from Contractor shall show both the emergency purchase order number and Contract number.

23. Error and Omissions:

All reports, files and other documents prepared and submitted by Contractor shall be complete and shall be carefully checked by the professional(s) identified by Contractor as Project Manager and key personnel attached hereto, prior to submission to the County. Contractor agrees that County review is discretionary, and Contractor shall not assume that the County will discover errors and/or omissions. If the County discovers any errors or omissions prior to approving Contractor’s reports, files and other written documents, the reports, files or documents will be returned to Contractor for correction. Should the County or others discover errors or omissions in the reports, files or other written documents submitted by the Contractor after County approval thereof, County approval of Contractor’s reports, files or documents shall not be used as a defense by Contractor in any action between the County and Contractor, and the reports, files or documents will be returned to Contractor for correction.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 245 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 17 of 35 ends

File No. 2736403

24. Equal Employment Opportunity:

Contractor shall comply with U.S. Executive Order 11246 entitled, “Equal Employment Opportunity” as amended by Executive Order 11375 and as supplemented in Department of Labor regulations (41 CFR, Part 60) and applicable state of California regulations as may now exist or be amended in the future.

Contractor shall not discriminate against any employee or applicant for employment on the basis of race, color, national origin, ancestry, religion, sex, marital status, political affiliation or physical or mental condition.

Regarding handicapped persons, Contractor will not discriminate against any employee or applicant for employment because of physical or mental handicap in regard to any position for which the employee or applicant for employment is qualified. Contractor agrees to provide equal opportunity to handicapped persons in employment or in advancement in employment or otherwise treat qualified handicapped individuals without discrimination based upon their physical or mental handicaps in all employment practices such as the following: employment, upgrading, promotions, transfers, recruitments, advertising, layoffs, terminations, rate of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor agrees to comply with the provisions of Sections 503 and 504 of the Rehabilitation Act of 1973, as amended, pertaining to prohibition of discrimination against qualified handicapped persons in all programs and/or activities as detailed in regulations signed by the Secretary of the Department of Health and Human Services effective June 3, 1977, and found in the Federal Register, Volume 42, No. 68 dated May 4, 1977, as may now exist or be amended in the future.

Regarding Americans with disabilities, Contractor agrees to comply with applicable provisions of Title 1 of the Americans with Disabilities Act enacted in 1990 as may now exist or be amended in the future.

25. Headings:

The various headings and numbers herein, the grouping of provisions of this Contract into separate clauses and articles, and the organization hereof are for the purpose of convenience only and shall not limit or otherwise affect the meaning hereof.

26. News/Information Release:

Contractor agrees that it will not issue any news releases in connection with either the award of this Contract or any subsequent amendment of or effort under this Contract without first obtaining review and written approval of said news releases from County through County’s Project Manager.

27. Notices:

Any and all notices, requests, demands and other communications contemplated, called for, permitted, or required to be given hereunder shall be in writing with a copy provided to the assigned DPA, except through the course of the Parties’ Project Managers’ routine exchange of information and cooperation during the terms of the work and services. Any written communications shall be deemed to have been duly given upon actual in-person delivery, if delivery is by direct hand, or upon delivery on the actual day of receipt or no greater than four (4) calendar days after being mailed by US certified or registered mail, return receipt requested, postage prepaid, whichever occurs first. The date of mailing shall count as the first day. All communications shall be addressed to the appropriate party at the address stated herein or such other address as the Parties hereto may designate by written notice from time to time in the manner aforesaid.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 246 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 18 of 35 ends

File No. 2736403
Contractor: G2 Construction Inc.

Attn: Eric Taylor
Address: 1352 E. Borchard Ave.

Santa Ana, CA 92705
Phone: 714-679-2550
Email: [email protected]
County's Project Manager: OC Public Works
Attn: Stephanie Gad
Address: 2301 N. Glassell St.

Orange, CA 92865
Phone: 714-955-0670
Email: [email protected]
cc: OCTA Environmental Cleanup Program (ECP) Manager
Attn: Alison Army
Address: 550 S. Main St.

Orange, CA 92868
Phone: 714-560-5537
Email: [email protected]
cc: OC Public Works/Procurement Services
Attn: Wayne Hsiao, County DPA
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 247 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 19 of 35 ends

File No. 2736403
Address: 601 North Ross Street
Santa Ana, CA 92701
Phone: (714) 667-9626
Email: [email protected]

28. Precedence:

Contract documents consist of this Contract and its exhibits and attachments. In the event of a conflict between or among Contract documents, the order of precedence shall be the provisions of the main body of this Contract, i.e., those provisions set forth in the recitals and articles of this Contract, and then the exhibits and attachments.

29. Subcontracting:

No performance of this Contract or any portion thereof may be subcontracted by Contractor without the express written consent of County. Any attempt by Contractor to subcontract any performance of this Contract without the express written consent of County shall be invalid and shall constitute a breach of this Contract.

In the event that the Contractor is authorized by the County to subcontract, this Contract shall take precedence over the terms of the Contract between Contractor and subcontractor, and shall incorporate by reference the terms of this Contract. The County shall look to the Contractor for performance and indemnification and not deal directly with any subcontractor. All work performed by a subcontractor must meet the approval of the County of Orange.

30. Termination – Orderly:

After receipt of a termination notice from County of Orange, Contractor may submit to County a termination claim, if applicable. Such claim shall be submitted promptly, but in no event later than 60 days from the effective date of the termination, unless one or more extensions in writing are granted by County upon written request of Contractor. Upon termination County agrees to pay Contractor for all services performed prior to termination which meet the requirements of Contract, provided, however, that such compensation combined with previously paid compensation shall not exceed the total compensation set forth in Contract. Upon termination or other expiration of this Contract, each party shall promptly return to the other party all papers, materials, and other properties of the other held by each for purposes of performance of Contract.

31. Usage:

No guarantee is given by County to Contractor regarding usage of this Contract. Usage figures, if provided, are approximations. Contractor agrees to supply services and/or commodities requested, as needed by County of Orange, at rates/prices listed in Contract, regardless of quantity requested.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 248 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 20 of 35 ends

File No. 2736403

32. Usage Reports:

Contractor shall submit usage reports on an annual basis to the assigned Deputy Purchasing Agent of County of Orange user agency/department. The usage report shall be in a format specified by the user agency/department and shall be submitted 90 days prior to the expiration date of Contract term, or any subsequent renewal term, if applicable.

33. Project Manager, County:

The County shall appoint a Project Manager to act as liaison between the County and the Contractor during the term of this Contract. The County’s Project Manager shall coordinate the activities of the County staff assigned to work with the Contractor.

The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager and key personnel. The County’s Project Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within three (3) business days after written notice from the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager and key personnel. Said approval shall not be unreasonably withheld. The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

34. Mandatory Kick-Off Meeting:

Upon award of the contract, the awarded vendor(s) may be required to attend a mandatory kick-off meeting with County representatives to discuss important information related to the scope of work, the contract, and the invoice payment process. A quarterly check-in meeting may be required to review any issues with the contract.

35. Prevailing Wage:

A. Prevailing Wage (Labor Code §1773): Pursuant to the provisions of Section 1773 et seq. of the California Labor Code, Contractor shall comply with the general prevailing rates of per diem wages and the general prevailing rates for holiday and overtime wages in this locality for each craft, classification, or type of worker needed to execute Contract. The rates are available from the Director of the Department of Industrial Relations at the following website: http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm. Contractor shall post a copy of such wage rates at the job site and shall pay the adopted prevailing wage rates. Contractor shall comply with the provisions of Sections 1775 and 1813 of the Labor Code.

B. Labor Code Requirements: Contractor and all Subcontractors shall comply with all applicable requirements of the Labor Code throughout the performance of Contract, including but not limited to the following:

C. Labor Code Notice: Contractor and all Subcontractors must comply with the requirements of Labor Code Section 1771.1(a), pertaining to registration of contractors pursuant to Section 1725.5.

Bids cannot be accepted from unregistered contractors except as provided in Section 1771.1. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 249 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 21 of 35 ends

File No. 2736403
Relations. After award of the Contract, Contractor and each Subcontractor shall furnish electronic payroll records directly to the Labor Commissioner in the manner specified in Labor Code Section 1771.4.

D. Threshold Requirements for Prevailing Wages: Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works.

E. Wage Rates: Contractor shall post a copy of the wage rates at the job site and shall pay the adopted prevailing wage rates as a minimum. Pursuant to the provisions of Section 1773 of the Labor Code of the State of California, the Board of Supervisors has obtained the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification, or type of workman needed to execute this Contract from the Director of the Department of Industrial Relations. These rates are on file with the Clerk of the Board of Supervisors. Copies may be obtained at cost at the office of County's OC Public Works/OC Facilities & Asset Management/A&E Project Management or visit the website of the Department of Industrial Relations, Prevailing Wage Unit at www.dir.ca.gov/DLSR/PWD. The Contractor shall comply with the provisions of Sections 1774, 1775, 1776 and 1813 of the Labor Code.

F. Apprenticeship Requirements: The Contractor shall comply with Section 230.1(A), California Code of Regulations as required by the Department of Industrial Relations, Division of Apprenticeship Standards by submitting DAS Form to the Joint Apprenticeship Committee of the craft or trade in the area of the site.

G. Registration of Contractor: All contractors and subcontractors must comply with the requirements of Labor Code Section 1771.1(a), pertaining to registration of contractors pursuant to Section 1725.5. Bids cannot be accepted from unregistered contractors except as provided in Section 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. After award of the contract, Contractor and each Subcontractor shall furnish electronic payroll records directly to the Labor Commissioner in the manner specified in Labor Code Section 1771.4.

H. Prevailing Wage and DIR Requirement: Awarding agencies are not required to submit the notice of contract award through DIR’s PWC-100 system on projects that fall within the small project exemption. The small project exemption applies for all public works projects that do not exceed:
• $25,000 for new construction, alteration, installation, demolition or repair • $15,000 for maintenance
If the project meets or exceeds these amounts, the County and the Contractor are required to register the project with the California Department of Industrial Relations.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 250 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 22 of 35 ends

File No. 2736403
I. Payroll Records: Contractor and any Subcontractor(s) shall comply with the requirements of Labor Code Section 1776. Such compliance includes the obligation to furnish the records specified in Section 1776 directly to the Labor Commissioner in an electronic format, or other format as specified by the Commissioner, in the manner provided by Labor Code Section 1771.4.

The requirements of Labor Code Section 1776 provide, in summary:

1. Contractor and any Subcontractor(s) performing any portion of the work under this Contract shall keep an accurate record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or any Subcontractor(s) in connection with the work.

2. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
a. The information contained in the payroll record is true and correct. b. The employer has complied with the requirements of Labor Code Sections 1771, 1811, and 1815 for any work performed by his or her employees in connection with the Contract.

3. The payroll records shall be certified and shall be available for inspection at the principal office of Contractor on the basis set forth in Labor Code Section 1776.

4. Contractor shall inform County of the location of the payroll records, including the street address, city and county, and shall, within five (5) working days, provide a notice of any change of location and address of the records.

5. Pursuant to Labor Code Section 1776, Contractor and any Subcontractor(s) shall have ten (10) days in which to provide a certified copy of the payroll records subsequent to receipt of a written notice requesting the records described herein. In the event that Contractor or any Subcontractor fails to comply within the ten (10) day period, he or she shall, as a penalty to County, forfeit one hundred dollars ($100), or a higher amount as provided by Section 1776, for each calendar day, or portion thereof, for each worker to whom the noncompliance pertains, until strict compliance is effectuated. Contractor acknowledges that, without limitation as to other remedies of enforcement available to County, upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement of the California Department of Industrial Relations, such penalties shall be withheld from progress payments then due Contractor. Contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.

6. Contractor and any Subcontractor(s) shall comply with the provisions of Labor Code Sections 1771 et seq., and shall pay workers employed on the Contract not less than the general prevailing rates of per diem wages and holiday and overtime wages as determined by the Director of Industrial Relations. Contractor shall post a copy of these wage rates at the job site for each craft, classification, or type of worker needed in the performance of this Contract, as well as any additional job site notices required by Labor Code Section 1771.4(b). Copies of these rates are on file at the principal office of County’s representative, or may be obtained Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 251 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 23 of 35 ends

File No. 2736403
from the State Office, Department of Industrial Relations (“DIR”) or from the DIR’s website at www.dir.ca.gov. If the Contract is federally funded, Contractor and any Subcontractor(s) shall not pay less than the higher of these rates or the rates determined by the United States Department of Labor.

36. Work Hour Penalty:

Eight (8) hours of labor constitute a legal day's work, and forty hours constitute a legal week's work.

Pursuant to Section 1813 of the Labor Code of the State of California, the Contractor shall forfeit to the County Twenty Five Dollars ($25) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than the legal day's or week's work, except that work performed by employees of said Contractor and subcontractors in excess of the legal limit shall be permitted without the foregoing penalty upon the payment of compensation to the workers for all hours worked in excess of eight (8) hours per day of not less than 1-1/2 times the basic rate of pay.

37. Wage Rate Penalty:

Contractor and any Subcontractor(s) shall comply with the provisions of Labor Code Section 1775.

Contractor and any Subcontractor(s) shall be subject to a penalty in an amount up to $200, or a higher amount as provided by Section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates for any work done by Contractor or Subcontractor(s) under Contract.

38. Apprentices:

The Contractor acknowledges and agrees that, if this Contract involves a dollar amount greater than or a number of working days greater than that specified in Labor Code Section 1777.5, this Contract is governed by the provisions of Labor Code Section 1777.5. It shall be the responsibility of the Contractor to ensure compliance with this Article and with Labor Code Section 1777.5 for all apprenticeable occupations.

Pursuant to Labor Code Section 1777.5 if that Section applies to this Contract as indicated above, the Contractor and any subcontractors under him employing workers in any apprenticeable craft or trade in performing any work under this Contract shall apply to the applicable joint apprenticeship committee for a certificate approving the Contractor or subcontractor under the applicable apprenticeship standards and fixing the ratio of apprentices to journeymen employed in performing the work. Pursuant to Labor Code Section 1777.5 if that Section applies to this Contract as indicated above, the Contractor and any subcontractor under him may be required to make contributions to the apprenticeship program. The Contractor and all subcontractors under him shall comply with Labor Code Section 1777.6 which Section forbids certain discriminatory practices in the employment of apprentices.

39. Safety Data Sheets (SDS):

The Contractor is required to provide a completed Safety Data Sheet (SDS) for each hazardous substance provided to the County under the Contractor’s Contract with the County. This includes hazardous substances that are not directly included in the Contract, but are included in the goods or services provided by the Contractor to the County. The provision of the SDSs must be in accordance with the requirements of California Labor Code Sections 6380 through 6399, General Industry Safety Order Section 5194, and Title 8, California Code of Regulations. The SDSs for each substance must be sent to the place of shipment or provision of goods/service.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 252 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 24 of 35 ends

File No. 2736403

40. Permits and Licenses:

Contractor shall be required to obtain any and all approvals, permits and/or licenses which may be required in connection with the permitted operation as set out herein. No permit approval or consent given hereunder by County in its governmental capacity shall affect or limit Contractor’s obligations hereunder, nor shall any approvals or consents given by County as a party to this Contract, be deemed approval as to compliance or conformance with applicable governmental codes, laws, ordinances, rules, or regulations.

41. Inventory:

County has an ongoing requirement for the commodities indicated in this Contract. Contractor shall maintain a reasonable stock on hand of all commodities for delivery upon request.

42. Order Dates:

Orders may be placed during the term of Contract even if delivery may not be made until after the term of Contract. Order dates take precedence over delivery dates. Contract must clearly identify the order date on all invoices to County.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 253 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 25 of 35 ends

File No. 2736403

SIGNATURE PAGE
IN WITNESS WHEREOF, the Parties hereto have executed this Contract on the date following their respective signatures.

G2 Construction Inc.*
Signature Name Title Date
Signature Name Title Date
COUNTY OF ORANGE, A political subdivision of the State of California COUNTY AUTHORIZED SIGNATURE:

Deputy Purchasing Agent
Signature Name Title Date
Approved as to form:

County Counsel
By:_______________________________________
Deputy
Name: ____________________________________
Date: _____________________________________
*If the contracting party is a corporation, (2) two signatures are required: one (1) signature by the Chairman of the Board, the President or any Vice President; and one (1) signature by the Secretary, any Assistant Secretary, the Chief Financial Officer or any Assistant Treasurer. The signature of one person alone is sufficient to bind a corporation, as long as he or she holds corporate offices in each of the two categories described above. For County purposes, proof of such dual office holding will be satisfied by having the individual sign the instrument twice, each time indicating his or her office that qualifies under the above described provision. In the alternative, a single corporate signature is acceptable when accompanied by a corporate resolution demonstrating the legal authority of the signee to bind the corporation.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 John R. Alvarado President 8/8/2025 | 5:17 PM EDT
Lydia G. Alvarado Secretary 8/8/2025 | 2:23 PM PDT
William Ninh
8/8/2025 | 2:30 PM PDT
Wayne Hsiao 8/8/2025 | 2:32 PM PDT

Page 254 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 26 of 35 ends

File No. 2736403

ATTACHMENT A - SCOPE OF WORK

1. Scope of Work
The Scope of Work is described as follows.

2. Background
The Orange County Transportation Authority’s (OCTA) Environmental Cleanup Program (ECP) provides a two percent allocation of annual gross Measure M2 (M2) revenues to improve overall water quality in Orange County from transportation-related pollution. The ECP competitive funds can be used to implement water quality improvement projects addressing pollutants originating from or conveyed through transportation systems. These funds will assist Orange County cities and the County of Orange in meeting federal Clean Water Act standards for urban runoff through the purchase and installation of recognized structural best management practices (BMPs). Third parties such as public water and wastewater agencies, environmental advocacy organizations, and homeowners associations may also nominate projects through a municipality that is willing and able to take responsibility for carrying out and maintaining the project.

3. Description of Project
In concert with the M2 Grant Program, this Scope of Work is designed to assemble a panel of Contractors to achieve economies of scale on a list of fixed unit prices for the purchase and installation of equipment and devices designed to remove litter, debris, and other water quality pollutants, herein referred to as “Stormwater Treatment Devices.” Selected Contractors will be part of a Master Agreement with the County of Orange that will allow municipalities to select from a listing of Contractors to provide, supply, fabricate, construct, deliver, and install Stormwater Treatment Devices. Municipalities wishing to use this Contract may purchase BMPs with M2 grant monies or any other funding source.

Accordingly, the goal of this Contract is to achieve strategic savings that would benefit the County and OCTA to act as the purchasing and contract administrators for M2 grant-eligible entities. Awarded ECP entities are not obligated to utilize the selected Contractors. Rather, this process is intended to provide a mechanism for reduced rates for equipment and its installation for Orange County municipalities, including those implementing projects with M2 funding. In addition, if a local agency utilizes this Contract, a separate agreement, city council resolution, or other protocol may be necessary with the selected Contractor(s). The eligible qualifications are discussed below.

4. Eligibility Qualifications
Stormwater Treatment Devices must be capable of handling flows from a design storm of 0.2-inches/hour.

The hydrologic method to be used to calculate the flow associated with LID and water quality design storm flow is:

Frequired = C × I × A
Where Frequired = Flow capacity (cubic feet/sec); C = runoff coefficient (ranges from 0 to 1); I = 0.2 inches/hour; and A = tributary area (acres).

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 255 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 27 of 35 ends

File No. 2736403
Treatment devices should also be able to operate in a hydraulic surcharge condition (defined as a condition that exceeds the design discharge) without releasing stored pollutants to the receiving water. Stormwater Treatment Devices which meet this definition and would be eligible for consideration are:

A. Hydrodynamic Separation and Gross Solids Removal Devices Hydrodynamic separators are flow-through structures with a settling or separation unit to remove sediments and other pollutants and are widely used in stormwater treatment. No outside power source is required, because the energy of the flowing water allows the sediments to efficiently separate. Depending on the type of unit, this separation may be by means of centrifugal force or indirect filtration.

Gross Solids Removal Devices (either linear radial or inclined screen) are structural best management practices designed to remove trash, vegetative material, and other particles of relatively large, gross size from stormwater runoff.

B. Catch Basin Inserts
Catch basin inserts are designed to remove oil and grease, trash, debris, and sediment and improve the efficiency of catch basins. Some inserts are designed to drop directly into existing catch basins, while others may require retrofit construction. Several varieties of catch basin inserts exist for filtering runoff.

C. Automatic Retractable Screens
Automatic retractable screens are mounted inside a storm drain inlet and are designed to remain closed to capture debris during the dry season. During storm events, the screens retract, allowing heavy flows to enter the storm drain.

D. Cartridge Filter-type Control Devices
Cartridge filter–type controls typically consist of a series of vertical filters contained in a vault or catch basin that provide treatment through filtration and sedimentation.

E. Biological Treatment Devices
Bioretention devices include raingardens, swales, and filter strips; all use plants and substrate to detain and filter stormwater to reduce excessive runoff from roads and paved surfaces, and provide opportunities for enhancing natural landscape and biodiversity elements in the urban environment.

F. In-line Trash and Debris Capture Devices (Trash Booms and Trash Nets) Trash booms and nets are designed to assist in the control, containment and recovery of floating trash, debris, timber, urban waste or aquatic plants. Typically built as floating structures, these devices are designed to control pollution along the surface of the water.

G. New, Emerging, or Alternative Trash and Debris Devices Upon request, the Contractor shall submit supplemental proposals for new, emerging, or alternative trash and debris removal devices reasonably related to the categories listed within Attachment A Section 4 and to meet the intent of Attachment A Section 3. Contractor must obtain written approval from the County and/or local agency designee prior to commencing any work for these new, emerging, or alternative trash and debris removal devices, which may include but not be limited to design, fabrication, and/or installation of these devices not already included in this scope of work. Upon completion of any work related to these devices, the local agency designee and Contractor will inspect the finished product at no Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 256 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 28 of 35 ends

File No. 2736403
additional cost. Upon mutual acceptance of the work product, the Contractor shall again be responsible for all services originally covered under this Contract and the work performed under this section.

5. Requirements
• The devices shall be ready for shipment, delivery and/or installation within two months of receipt of orders.
• Warranty on parts and labor shall be for a minimum of 10 years.

6. Equipment Design and Specifications Report
All proposals shall include information pertaining to the proposed stormwater treatment device, including, but not limited to: product description, design, engineering, siting, operation, and maintenance. The following information should be summarized in an Equipment Design and Specification Report (Report) for each proposed device in the given order as listed below.

A. Description/Design/Engineering
• Describe how the equipment meets the intent of the OCTA Tier 1 Environmental Cleanup Program.
• A detailed description of the equipment and design elements, inclusive of sizing and geometry (include diagrams or CAD files).
• Materials used to construct the equipment (i.e., stainless steel, grade, plastic, etc.). • Flow or range of flows for which equipment is rated (in cubic feet per second). • Estimated design life of the equipment.

B. Performance Effectiveness
• Performance effectiveness in reducing trash, litter, debris and other transportation related pollutants (percent reduction) and associated transportation related water quality impacts (include independent analyses if any).
• Trash capture (meeting the definition of “full capture system”) and storage capacity of the equipment (if applicable).
• Overflow or bypass flow capacity of the equipment when full of trash and overflowing (i.e., storage capacity of the equipment when the one-year, one hour storm is no longer fully filtered) (if applicable).
• Maximum overflow or bypass flow capacity of the device (i.e., 10-year storm event) (if applicable).
• Device performance effectiveness in terms of pounds of trash removed per total project cost (see section V., F.)
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 257 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 29 of 35 ends

File No. 2736403
C. Siting, Operation, and Maintenance
• Description of Contractor’s installation process including consultation and review of device locations with municipal staff, traffic control during installation, and estimated time required to install each device.
• Description of the site-specific measurements and other information a municipality must provide the Contractor for determining the appropriate size and configuration of the device for that location (i.e. Eligible entities will need to determine how to select the right device for their desired location).
• A discussion of any regulatory permits that may be required for installation. • Maintenance requirements (describe in detail how the device must be maintained and the approximate amount of time required for cleaning or maintenance. In addition, discuss whether the device has design capabilities for easy removal for cleaning or maintenance). • Estimated life cycle costs for maintenance.
• Durability against external factors, such as street sweeping, car parking, etc. • Availability of replacement parts and life expectancy. • Warranty coverage and duration.
• Aesthetics and safety.
• Any key factors that makes the device unique among other products.

D. Contractor’s Installation Background
• Ability of Contractor to have staff and/or subcontractor(s) to manufacture device and provide installation to eligible entities within Orange County. • Experience, background, training, and number of staff and/or subcontractor(s) who will fabricate and/or install device.

E. Operating Locations, References, and Certifications
• A minimum of three locations, inclusive of address or nearest intersection, and photos of device in operation within southern California, preferably Orange County. • References from three public agencies. (See Appendix A for Contractor’s Reference Forms). • Certifications obtained from public agencies and/or Regional Water Quality Control Boards.

7. Project Management, Coordination, and Administration A kick-off meeting with selected Contractors and the County shall be held to discuss the contractual terms of the Master Agreement. This will establish management, coordination, and administration protocols, and address other issues, as necessary, to ensure that the contractual terms are met. The Contractor’s Project Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 258 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 30 of 35 ends

File No. 2736403
Manager shall communicate and coordinate in a timely manner all work and progress with the County’s Project Manager.

A monthly progress report detailing the stormwater treatment device purchases and installation per local agency shall be prepared by the Contractor’s Project Manager and submitted to the County’s Project Manager.

Progress reports shall include the ongoing status of work, significant accomplishments, problems encountered and anticipated with potential solutions, and work planned for the next month (by task and responsible person). In addition, the Contractor will be responsible for developing a Tier 1 Program spreadsheet to capture information from awarded ECP entities. The database will contain the following:
• Name of Entity
• Contact Name
• Contact Phone Number
• Contact E-mail Address
• Date of Installation
• Device inventory number, name, and type
• Size/capacity of device
• Location of installations
• Best estimate of catchment area
• Anticipated number of installations within the next month The monthly progress report shall be received no later than the tenth (10th) calendar day of the month.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 259 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 31 of 35 ends

File No. 2736403

ATTACHMENT B - PAYMENT AND COMPENSATION

1. Compensation:

This is a firm fixed fee Contract between County and Contractor for Service Description as set forth in Attachment A, “Scope of Work”.

Contractor agrees to accept the specified compensation as set forth in this Contract as full payment for performing all services and furnishing all staffing and materials required, for any reasonably unforeseen difficulties which may arise or be encountered in the execution of the services until acceptance, for risks connected with the services, and for performance by Contractor of all its duties and obligations hereunder. Contractor shall only be compensated as set forth herein for work performed in accordance with the Scope of Work. County shall have no obligation to pay any sum in excess of the fixed rates specified herein unless authorized by amendment in accordance with Articles "Changes" and "Amendments" of County Contract Terms and Conditions, which may require approval by the County Board of Supervisors.

2. Fees and Charges:

A. County will pay the fees and charges in accordance with the provisions of this Contract.

Contractor guarantees that pricing is based on best information from Attachment A, “Scope of Work”. There are four areas for which pricing information needs to satisfy :

1. Estimated average cost of design and engineering for each type of equipment or device.

2. Estimated unit cost of equipment fabrication or cost of pre-fabricated device.

3. Estimated average cost of device installation, including labor and equipment (include separate line item for each type of device).

4. Estimated average annual life cycle cost of operation and maintenance for each type of device.

Device Type Design and
Engineering
Cost
Unit Cost of
Equipment
Fabrication
Average
Cost of
Device
Installation
Annual
Operation
and
Maintenance
Cost
Total Cost
CPS-Mod™ $268 $766 $442 $95 $1,571
GITS™ $343 $1,874 $286 $95 $2,598
ARS-CL™ $236 $1,069 $230 $80 $1,615
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 260 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 32 of 35 ends

File No. 2736403
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 261 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 33 of 35 ends

File No. 2736403
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 262 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 34 of 35 ends

File No. 2736403

3. Price Increase/Decreases:

No price increases will be considered during the first year of the Contract. County requires documented proof of cost increases on Contracts prior to any price adjustment. A minimum of 180-days advance notice in writing is required for consideration of such adjustment. No retroactive price adjustments will be considered. All price decreases will automatically be extended to County of Orange. County may enforce, negotiate, or cancel escalating price Contracts or take any other action it deems appropriate, as it sees fit. The net dollar amount of profit will remain firm during the period of Contract. Adjustments increasing Contractor’s profit will not be allowed.

4. Firm Discount and Pricing Structure:

Contractor guarantees that prices quoted are equal to or less than prices quoted to any other local, State or Federal government entity for services of equal or lesser scope. Contractor agrees that no price increases shall be passed along to County during the term of this Contract not otherwise specified and provided for within this Contract.

5. Contractor’s Expense:

Contractor will be responsible for all costs related to photo copying, telephone communications and fax communications while on County sites during the performance of work and services under this Contract.

6. Payment Terms – Payment in Arrears:

Invoices are to be submitted in arrears to the user agency/department to the ship-to address, unless otherwise directed in this Contract. Contractor shall reference Contract number on invoice. Payment will be net thirty (30) days after receipt of an invoice in a format acceptable to County of Orange and verified and approved by the agency/department and subject to routine processing requirements. The responsibility for providing an acceptable invoice rests with Contractor.

Billing shall cover services and/or goods not previously invoiced. Contractor shall reimburse County of Orange for any monies paid to Contractor for goods or services not provided or when goods or services do not meet Contract requirements.

Payments made by the County shall not preclude the right of the County from thereafter disputing any items or services involved or billed under this Contract and shall not be construed as acceptance of any part of the goods or services.

7. Taxpayer ID Number:

Contractor shall include its taxpayer ID number on all invoices submitted to County for payment to ensure compliance with IRS requirements and to expedite payment processing.

8. Payment – Invoicing Instructions:

Payment – Invoicing Instructions: The Contractor will provide an invoice on the Contractor’s letterhead for goods delivered and/or services rendered. In the case of goods, the Contractor will leave an invoice with each delivery. Each invoice will have a number and will include the following information:
a. Contractor’s name and address
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 263 ends

County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 35 of 35 ends

File No. 2736403
b. Contractor’s remittance address, if different from “A” above c. Contractor’s Taxpayer ID Number
d. Name of County Agency/Department
e. Delivery/Service address
f. Contract Number MA-080-25011708
g. Agency/Department’s Account Number
h. Date of order
i. Product/Service description, quantity, and prices
j. Sales tax, if applicable
k. Freight/Delivery Charges, if applicable
l. Total
Invoices and support documentation are to be forwarded to:

OC Public Works
Attn: Accounts Payable
P.O. Box 4048
Santa Ana, CA 92702
Email: [email protected]

9. Payment (Electronic Funds Transfer (EFT):

County of Orange offers contractors the option of receiving payment directly to their bank account via an Electronic Fund Transfer (EFT) process in lieu of a check payment. Payment made via EFT will also receive an Electronic Remittance Advice with the payment details via e-mail. An e-mail address will need to be provided to The County of Orange via an EFT Authorization Form. To request a form, please contact the agency/department Procurement Buyer listed in Contract. Upon completion of the form, please mail, fax or email to the address or phone listed on the form.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12

Page 264 ends

EXHIBIT B

Page 265 ends

CA Lic. #801253 – A, C8, C60
1352 E. Borchard Ave.

Santa Ana, CA 92705
6/18/2025
Ted Von Bitner, PhD, VP Environmental Scientist
Katelynn Webb, GIS Analysis

WSP USA
3560 Hyland Ave #100
Costa Mesa, CA 92626
Ted and Katelynn:

As requested, I’ve updated G2’s proposal for the City of Fountain Valley. The revisions to our scope of work include:
• G2 repairing the catch basin on Edinger Avenue. (Detailed proposal on page 7). • G2 performing the work previously listed as optional (catch basin preparation work including removing old baskets, removing excess concrete, etc.; custom design when required; project bonds; note, if selected CBs require lane closure, then City to provide).
• Installing an additional 10 CPS-Mod Full Capture Systems for a total of 330.

The other elements of our proposal remain the same. The attached proposal is for G2 to install our proprietary CPS-Mod™ Full Capture System (FCS) devices in City owned catch basins (CBs). The Quote section shows our fixed unit pricing. The quote includes all services that may be needed during the project.

The proposal targets the installation of 330 CBs with our CPS-Mod so the City can maximize the funds from their OCTA Project X grant award. The required device size and type for each CB is not currently known, or the types of work needed to prepare the CBs for installation. This proposal estimates these quantities, and the actual information will become known after G2 performs CB field reviews and measurements at the start of the project. As discussed, some listed CBs will not be installable, and additional CBs will need to be field reviewed to reach 330 installations.

This proposal’s total cost for G2’s work is $491,164. The actual cost will depend on the quantities of work performed.

Attached is our Proposal for your review. If you would like additional information or clarification before or after presenting it to the City of Fountain Valley, then please do not hesitate to ask.

Thanks for the opportunity. It’s always great working with you both, and the rest of the WSP Team.

Sincerely,
Eric H. Taylor, LEED AP BD+C, PMP, MBA
VP, Projects & Business Dev
G2 Construction, Inc.
714.679.2550 www.g2construction.com

Page 266 ends

Proposal For
CITY of FOUNTAIN VALLEY
CPS-Mod™ Full-Capture Systems
in City owned Catch Basins
June 18, 2025
Prepared For:

Soumelia Gountoumas
City of Fountain Valley
10200 Slater Avenue
Fountain Valley, CA 92708
Proposal Requested By:

Ted Von Bitner & Katelynn Webb

WSP USA
Prepared By:

Eric H. Taylor
G2 Construction, Inc.
714.679.2550 [email protected]

Page 267 ends

CA Lic. #801253 – A, C8, C60
1352 E. Borchard Ave.

Santa Ana, CA 92705
6/18/2025
Soumelia Gountoumas
Environmental Services Administrator
City of Fountain Valley
1020 Slater Avenue
Fountain Valley, CA 92708
Dear Ms. Gountoumas:

G2 Construction (G2) is pleased to offer this revised Proposal to the City of Fountain Valley to install G2’s proprietary CPS-Mod™ Full Capture System (FCS) devices in City owned catch basins (CBs).

As requested, this revised proposal includes repairing the top deck of a catch basin on Edinger Avenue.

It also includes G2 performing most of the items identified as optional in our previous proposal dated January 16, 2025.

This proposal prioritizes the quantity of devices installed (330), and the City’s project construction budget.

By installing 330 CBs with CPS-Mod™ the City will maximize their OCTA Project X grant funds and efforts to meet the Waterboard’s requirement to install Full Capture Systems.

Our proposal details the costs for G2 to install devices of different sizes, and all activities that will or may be required during the City’s project. This offers the City the flexibility and transparency to easily make project choices. The cost for each custom CPS-Mod installation depends on the CB’s specifics, and G2’s field review and measurements to start the project will determine which locations are installable, the device sizes, and costs.

This proposal is based on our experience contracting with 13 other cities in Orange County to custom fabricate and install G2’s CPS-Mod and other stormwater protection devices on more than 40 OCTA ECP granted projects. We anticipate this Fountain Valley project will be like projects G2 installed for neighboring cities like Anaheim, Seal Beach, Buena Park, Fullerton, Placentia, Stanton, and Cypress.

G2’s patented CPS-Mod™ is made of 304 stainless steel and is certified as a Full Capture System by the California State Water Resources Control Board (State Water Board). This proposal includes a 10-year warranty on installed devices, and our CPS-Mod screens will meet the State’s Trash Amendment requirements for at least a decade, and likely much longer.

This proposal includes a fast, efficient, and smooth construction project that our customers find easy. We emphasize clear and ongoing communication, detailed documentation and photos of every installation, and provide timely documents the City will need for OCTA reimbursement. Most of G2’s business comes from repeat customers and word of mouth. Included are a few letters of reference.

Attached is our Proposal for your evaluation. If G2’s proposal is accepted, the final project costs will depend on the options selected by the City and the actual CPS-Mod sizes installed.

If you have any questions or feedback, then please do not hesitate to contact me. I look forward to the opportunity of working with you and the City of Fountain Valley.

Sincerely,
Eric H. Taylor, LEED AP BD+C, PMP, MBA
VP, Projects & Business Dev
G2 Construction, Inc.
714.679.2550 www.g2construction.com
2

Page 268 ends

TABLE OF CONTENTS

1. Cover 1

2. Cover Letter

3. Table of Contents

4. Quote – Detailed Project Estimate

Quote – CB Repair
2 3
4 7

5. Warranty 8

7. Project Schedule

8. Location Map

9. Potential Catch Basin List
9 10
11 10. G2 CPS-Mod Device information
Water Board Full Capture System certification
Device Filtered Flow Rate Test Results
16 20
21 11. G2 Credentials & Qualifications

12. Letters of Reference

13. DBE & MBE Certificate

14. OCLSB Certificate
25 27
40 43
3

Page 269 ends

Lic. #801253 - A, C8, C60
1352 E. Borchard Ave.

Santa Ana, CA 92705
714.748.4242
Customer: City of Fountain Valley Date: 6/18/2025
Lia Gountoumas, REHS Quote No.: 250618- FV
Environmental Services Administrator
10200 Slater Avenue
Fountain Valley, CA 92708
Eric H. Taylor
Contacts: Ted Von Bitner & Katelynn Webb By: Eric H. Taylor WSP USA VP, Bus Dev, G2 Construction, Inc.
949-363-3232 714.679.2550
[email protected] / [email protected] [email protected] This quote also includes a top deck repair of a catch basin on Edinger Avenue (Item 14).

Continued
The number of CPS-Mod devices by size categories and type are estimated. The interior dimensions and characteristics of the CBs will be known after G2 performs a full field review.

The City is targeting CBs in priority land use (PLU) areas: Residential High Density, Commercial, Industrial, Mixed Use, and Arterial roads. If one or more CBs are not capable of receiving a device, then an alternative location will be substituted.

QUOTE
City of Fountain Valley
High Priority CPS Screen Installation
330 CPS-Mod ™ for 330 Catch Basins
OCTA ECP Project X Tier 1 2024 Grant Project
Trash and Debris Capture Devices
(Good until for 90 Days)

DESCRIPTION
G2 Construction (G2) proposes to custom fabricate and install our patented G2 CPS-Mod™ Full Capture System connector pipe screens devices in 330 City catch basins (CBs).

This Quote below is an estimate. The unit prices are fixed and the quantities will vary based on the catch basins selected and the work performed.

Note: Key Assumptions and Key Device Information is listed directly after the Quote Estimate, and is critical to understanding this proposal.

Some activities required to prepare CBs for installation may be performed by the City, and not charged by G2.
1 of 3
4

Page 270 ends

Continued

ITEM DESCRIPTION UNIT

PRICE UNIT QUANTITY
(estimate) TOTAL

1.1 CPS-Mod™ & Installation Up to 4.5 $960 ea 160 $153,600

1.2 CPS-Mod™ & Installation 4.6 to 6.0 $1,199 ea 60 $71,940

1.3 CPS-Mod™ & Installation 6.1 to 9.0 $1,362 ea 35 $47,670

1.4 CPS-Mod™ & Installation 9.1 to 11.0 $1,554 ea 6 $9,324

2.1 CPS-Mod™- Heavy Duty (HD) Bracing. Up to 4.5 $1,228 ea 5 $6,140

2.2 CPS-Mod™- Heavy Duty (HD) Bracing. 4.6 to 6.0 $1,467 ea 30 $44,010

2.3 CPS-Mod™- Heavy Duty (HD) Bracing. 6.1 to 9.0 $1,630 ea 30 $48,900

2.4 CPS-Mod™- Heavy Duty (HD) Bracing. 9.1 to 11.0 $1,822 ea 4 $7,288 Device Count: 330
3 Field Review & Measurement $56 ea 330 $18,480
4 $50 ea 330 $16,500
5 $2,427 days 3 $7,281
6 Alternate CB Field Reviews & Measurements $56 ea 48 $2,688 7 Device Warranty - 10-year Included ea 330
8 Photos of installed devices Included ea 330
9 $500 ea 40 $20,000
10 $240 ea 9 $2,160
11 $300 ea 8 $2,400
12 $250 ea 8 $2,000
13 $300 hourly 10 $3,000
14 $15,521 LS 1 $15,521
TOTAL COST : $478,902
15 Option: Additional CPS-Mod devices installed. Not to Exceed Budget (approx. 8 devices) $12,262 Total + Option: $491,164
Continued

DETAILED QUOTE ESTIMATE
Device Size -
Filtration
SQFT
Cleaning Catch Basin (CB)- Standard (up to 30
minutes) (cleaned within 3 days prior to CPS-Mod install.) Traffic Control - Drop Off (Additional personnel). Does not include lane closures.

CB Preparation - Removing Existing Basket (Approx. 2
man-hours, tools, vehicle, basket cleanout & disposal)
CB Preparation - Opening "Frozen" Manholes (Approx. 1
man-hour, tools, vehicle)
CB Preparation - Removing Excess Concrete (Approx. 1
man-hour, tools, vehicle, disposal of concrete)
Cleaning CB - Difficult (1 to 3 man-hours). Does not
include vac truck.

Custom Designed Devices & CPS-Mod™. Examples:
discharge pipe in the floor; inbound pipe conflict; stair conflict.

Catch Basin Top Deck Repair (Edinger Ave.)
2 of 3

Page 271 ends

Continued
KEY ASSUMPTIONS about the Catch Basins for Installation:
1 CB Discharge Pipes diameters will not exceed 30".
2 CB Inbound Pipes diameters will not exceed 24".
3 CB will have no more than 1 discharge pipe or 1 inbound pipe. 4 CB does not have grates in vehicle drive lane that require traffic control to access. 5 CB does not have internal conflicts that do not allow a CPS to be installed. 6 CB will be free of existing devices; excess amounts of debris; does not have standing water. 7 Alternate CB targets will be provided for all CBs that are not installable for the above reasons, or others.

Key Device Information:

A
B
C
D
Terms & Conditions:
- G2 installers to be paid prevailing wage. Certified payroll provided. - City to provide Traffic Control if Lane Closures are required. - Final design configurations and costs to be revised after field evaluations. - Payment NET 30 days.

The devices installed will be G2 Construction's patented CPS-Mod Full Capture System certified screens. They are made with 14 gauge 304 stainless steel with 5mm holes covering 50% of the screen. These devices are installed around a catch basin's (CB's) discharge pipe, and stormwater is filtered before exiting the discharge pipe. All CPS-Mod will have a bypass that allows stormwater to overflow the screen if needed.

Line Items with CPS-Mod (# 1.1 - 2.4) include the custom device and installation. Installation is performed by skilled G2 technicians paid prevailing wage.

CPS-Mod are differentiated by the size of the filtration screen for the device. The size of the discharge pipe is significant in determining the device size, but not the only factor.

CPS-Mod often require an upgraded Heavy Duty (HD) structure and Bracing due to hydrodynamic forces with the CB. Examples include CBs with discharge pipes 30" or larger, and CBs with inbound pipes. CPS are not suitable for CBs with excessive hydrodynamic forces.

Thank You For Your Consideration of this Proposal.
3 of 3
6

Page 272 ends

G2 Construction, Inc. CITY of FOUNTAIN VALLEY
Catch Basin Deck and Sidewalk Repair

PROPOSAL
6/19/2025
LOCATION: EDINGER AVE north side, 200' west of Harbor Blvd.

SCOPE
Activity & Resources
Day 1 - Saw Cut & Demo
Labor - 3 men at 8 hrs each, with disposal support
Crew Truck, tools and equipment
Demo equipment delivery & pick up
Dump trailer and disposal
Day 2 Form Deck, Place Rebar & Hardware
Labor - 2 men, 8 hours each
Crew Truck, tools and equipment
Hardware - bulb angle & (1) support post middle
Lumber & hardware - new buld angle & (1) support post middle Day 3 Concrete Place & Finish
Labor - 3 men 8 hours each
Crew Truck, tools and equipment
Concrete Ready Mix - 560-C-3250, (2.25 yds).

Enviro fees, surcharges, shortload, etc
Day 4 Deck Form Recovery and Complete (3 days after Place & Labor - 2 men at 4 hours
Crew Truck, tools and equipment
Disposal
Daily Traffic Control lane closure for each day of activity Conditions: Pricing only available with device project. Sub-Total: $14,110 Overhead: $1,411
Profit: $0
TOTAL: $15,521
Remove damaged catch basin (CB) top deck and sidewalk. Replace top deck, bulb angle, and support post. Project to require 4 days of work, and traffic control lane closure during work.
7

Page 273 ends

Lic. #801253 - A, C8, C60
1352 E. Borchard Ave.

Santa Ana, CA 92705
714.748.4242
[email protected]
Date: January 14, 2025
CPS-Mod™

WARRANTY
Project: Fountain Valley - CPS-Mod™ Full-Capture Systems City of Fountain Valley OCTA Measure M2’s Environmental Cleanup Program (ECP) Tier 1 – Project X
G2 Construction, Inc. hereby provides a product warranty of 10 years for the G2 CPS-Mod™ connector pipe screens installed in catch basins for the project listed above. G2 guarantees the CPS-Mod™ will be manufactured and installed in accordance with the product drawings and specifications.

G2 Construction agrees to repair or replace any installed product that proves defective in its workmanship or material within one year of the project acceptance date. If an installed product proves defective within ten years, then G2 agrees to provide replacement parts at no cost.

Accidents, product modifications, vandalism, unusual use, or lack of standard cleaning may nullify a product’s warranty.

Requests for warranty service must be made by the product Owner, and should include photos and details.

John Alvarado, President
G2 Construction, Inc.
8

Page 274 ends

Lic. #801253 - A, C8, C60
1352 E. Borchard Ave.

Santa Ana, CA 92705
714.748.4242
[email protected]
Installation Schedule
City of Fountain Valley
OCTA ECP, Project X
January 14, 2025
Action Time (from signed
contract & NTP)

1. Evaluate all catch basins and take detailed
measurements.

Receive fabrication Notice to Proceed from City
3 weeks

2. Fabricate custom CPS-Mod™ 3 weeks

3. Install custom fitted G2 Devices 7 weeks

4. Inspection and sign-off
TOTAL PROJECT (start to finish)
.5 weeks

13.5 WEEKS
9

Page 275 ends

CITY of FOUNTAIN VALLEY
Map of Potential Catch Basins
For CPS-Mod™ Full Capture System Installations
10

Page 276 ends

City of Fountain Valley
Potential CBs for CPS-Mod
Source: WSP
# CB # Latitude Longitude Street Name
1 CB-B4006 33.714607 -117.976488 EL RANCHO AVE
2 CB-B4007 33.714681 -117.976837 ROSS ST
3 CB-B4015 33.711182 -117.972384 SANTA BARBARA ST
4 CB-B5004 33.701408 -117.973115 TALBERT AVE
5 CB-B5007 33.701412 -117.971956 TALBERT AVE
6 CB-B5009 33.70159 -117.971546 TALBERT AVE
7 CB-B5018 33.708643 -117.972055 SLATER AVE
8 CB-B5019 33.708451 -117.972052 SLATER AVE
9 CB-B5023 33.705466 -117.97232 SANTA ELENA ST
10 CB-B5024 33.705266 -117.972373 EL PRESIDENTE AVE
11 CB-B5025 33.703583 -117.972083 LA ROCA AVE
12 CB-B5026 33.703445 -117.972115 LA ROCA AVE
13 CB-B6047 33.69598 -117.97201 NILE RIVER AVE
14 CB-B6100 33.694122 -117.971294 ELLIS AVE
15 CB-B7007 33.690727 -117.97165 MAGNOLIA ST
16 CB-C2032 33.730206 -117.96965 EDINGER AVE
17 CB-C2044 33.72327 -117.96789 HEIL AVE
18 CB-C3001 33.716565 -117.971613 RECREATION CIRCLE
19 CB-C3002 33.716685 -117.971615 RECREATION CIRCLE
20 CB-C3029 33.717186 -117.963315 BUSHARD ST
21 CB-C3030 33.717415 -117.963443 CLOVER AVE
22 CB-C4030 33.715177 -117.963284 BUSHARD ST
23 CB-C4031 33.715142 -117.96307 BUSHARD ST
24 CB-C4034 33.714276 -117.963285 BUSHARD ST
25 CB-C4042 33.710979 -117.963013 BUSHARD ST
26 CB-C5001 33.708883 -117.962837 SLATER AVE
27 CB-C5033 33.701602 -117.967976 TALBERT AVE
28 CB-C5039 33.705408 -117.971453 WINDSOR AVE
29 CB-C5054 33.701411 -117.966436 TALBERT AVE
30 CB-C5058 33.708764 -117.971626 SLATER AVE
31 CB-C5068 33.704029 -117.964597 EASEMENT
32 CB-C6008 33.697691 -117.971766 HELM AVE
33 CB-C6009 33.697878 -117.971473 HELM AVE
34 CB-C6023 33.697662 -117.967119 COLVILLE ST
35 CB-C6030 33.699089 -117.964335 SWIFT AVE
36 CB-C6048 33.701278 -117.969519 TALBERT AVE
37 CB-C6050 33.701353 -117.967895 TALBERT AVE
38 CB-C6067 33.69945 -117.971506 MAGNOLIA ST
39 CB-C6069 33.699449 -117.971793 MAGNOLIA ST
40 CB-D3023 33.720104 -117.958296 SILKTREE ST
41 CB-D3026 33.718502 -117.958264 MARIPOSA AVE
42 CB-D3034 33.717507 -117.954276 BROOKHURST ST
43 CB-D4002 33.708846 -117.955634 SLATER AVE
44 CB-D4005 33.708873 -117.95606 SLATER AVE
45 CB-D4008 33.709077 -117.955698 SLATER AVE
46 CB-D4009 33.709318 -117.955929 SLATER AVE
47 CB-D4010 33.710303 -117.956576 EASEMENT
48 CB-D4020 33.712987 -117.958221 LA CAPILLA AVE
49 CB-D4021 33.712845 -117.958538 LA CAPILLA AVE
50 CB-D4035 33.708931 -117.961258 SLATER AVE
51 CB-D5003 33.701865 -117.955796 MT COULTER ST
52 CB-D5009 33.70162 -117.956716 TALBERT AVE
53 CB-D5012 33.701972 -117.957047 CASHEW ST
54 CB-D5015 33.701611 -117.957183 TALBERT AVE
55 CB-D5019 33.701955 -117.959016 CYPRESS ST
56 CB-D6009 33.701579 -117.962205 BRIAR ST
57 CB-D6027 33.700451 -117.957015 FOSTER ST
58 CB-D6029 33.700498 -117.957128 FOSTER ST
59 CB-D6035 33.699899 -117.957651 FOSTER ST
60 CB-D6036 33.698493 -117.957558 FOSTER ST
61 CB-D6038 33.698488 -117.957685 FOSTER ST
62 CB-D6039 33.698053 -117.957551 FOSTER ST
63 CB-D6055 33.698043 -117.957671 FOSTER ST
64 CB-D6056 33.697937 -117.957227 PETERS CT
65 CB-D6058 33.699158 -117.956243 DANWILL ST
11

Page 277 ends

City of Fountain Valley
Potential CBs for CPS-Mod
Source: WSP
66 CB-D6059 33.699077 -117.956292 DANWILL ST
67 CB-D6061 33.698538 -117.956284 DANWILL ST
68 CB-D6062 33.698535 -117.956376 DANWILL ST
69 CB-D6066 33.697928 -117.955982 TROWER CT
70 CB-D6069 33.697892 -117.954676 PHILLIPS AVE
71 CB-D6070 33.697783 -117.954676 PHILLIPS AVE
72 CB-D6071 33.698027 -117.95444 BROOKHURST ST
73 CB-D7024 33.686958 -117.959252 GARFIELD AVE
74 CB-D7047 33.692179 -117.956596 FINCH AVE
75 CB-D7058 33.691047 -117.954326 PRIVATE
76 CB-E1001 33.730556 -117.954334 EDINGER AVE
77 CB-E1005 33.730311 -117.954325 EDINGER AVE
78 CB-E1012 33.730612 -117.952369 EDINGER AVE
79 CB-E1015 33.730677 -117.950036 EDINGER AVE
80 CB-E1018 33.730444 -117.949598 EDINGER AVE
81 CB-E1020 33.730785 -117.946214 EDINGER AVE
82 CB-E2037 33.725369 -117.954417 BROOKHURST ST
83 CB-E3001 33.723436 -117.954265 BROOKHURST ST
84 CB-E3007 33.721968 -117.954383 BROOKHURST ST
85 CB-E3009 33.72012 -117.954373 BROOKHURST ST
86 CB-E4001 33.711171 -117.95185 PRIVATE
87 CB-E4002 33.710441 -117.951849 PRIVATE
88 CB-E4003 33.710617 -117.951717 SAN MATEO ST
89 CB-E4006 33.710242 -117.951561 SAN MATEO ST
90 CB-E4010 33.709291 -117.951418 SAN MATEO ST
91 CB-E4011 33.709293 -117.951249 SAN MATEO ST
92 CB-E4014 33.712868 -117.954286 BROOKHURST ST
93 CB-E4015 33.711839 -117.954197 PRIVATE
94 CB-E4016 33.711569 -117.954192 PRIVATE
95 CB-E4019 33.7104 -117.954117 EL CORAZON AVE
96 CB-E4020 33.710279 -117.954115 EL CORAZON AVE
97 CB-E4022 33.709359 -117.954236 BROOKHURST ST
98 CB-E4023 33.715408 -117.947944 CIRCULO DE VILLA
99 CB-E4024 33.714564 -117.947938 CALLE MADERO
100 CB-E4026 33.714441 -117.948697 CALLE MADERO
101 CB-E4028 33.714472 -117.95011 ALLEY
102 CB-E4030 33.712885 -117.95002 ALLEY
103 CB-E4031 33.71282 -117.950346 ALLEY "C"
104 CB-E4033 33.712822 -117.951716 SAN MATEO ST
105 CB-E4034 33.712784 -117.951572 SAN MATEO ST
106 CB-E4035 33.713549 -117.948705 CIRCULO DE ZAPATA
107 CB-E4037 33.712711 -117.950091 AVENIDA CINCO DE MAYO 108 CB-E4049 33.709173 -117.948807 SLATER AVE
109 CB-E4050 33.709165 -117.949867 SLATER AVE
110 CB-E4127 33.714546 -117.948699 CALLE MADERO
111 CB-E5001 33.709157 -117.951552 SLATER AVE
112 CB-E5003 33.709164 -117.950565 SLATER AVE
113 CB-E5030 33.70769 -117.954635 BROOKHURST ST
114 CB-E5031 33.707832 -117.954578 BROOKHURST ST
115 CB-E5060 33.707844 -117.954184 BROOKHURST ST
116 CB-E5068 33.701681 -117.946284 TALBERT AVE
117 CB-E5069 33.701927 -117.946288 TALBERT AVE
118 CB-E6001 33.700287 -117.950717 SHENANDOAH ST
119 CB-E6002 33.700181 -117.950594 SHENANDOAH ST
120 CB-E6004 33.698497 -117.951513 ADOBE RIVER AVE
121 CB-E6005 33.698611 -117.951562 ADOBE RIVER AVE
122 CB-E6011 33.698633 -117.949658 ADOBE RIVER AVE
123 CB-E6012 33.698508 -117.949661 ADOBE RIVER AVE
124 CB-E6015 33.70009 -117.948824 MUIRWOODS CT
125 CB-E6026 33.69849 -117.946394 ANTELOPE RIVER AVE
126 CB-E6027 33.698479 -117.946545 ANTELOPE RIVER AVE
127 CB-E6030 33.699508 -117.951761 HEARTH DR
128 CB-E6031 33.699541 -117.951943 HEARTH DR
129 CB-E6032 33.699469 -117.951906 HEARTH DR
130 CB-E6081 33.701909 -117.953038 TALBERT AVE
131 CB-E7002 33.687264 -117.953909 BROOKHURST ST
12

Page 278 ends

City of Fountain Valley
Potential CBs for CPS-Mod
Source: WSP
132 CB-E7003 33.686989 -117.953749 BROOKHURST ST
133 CB-E7033 33.692229 -117.953988 BROOKHURST ST
134 CB-E7039 33.69425 -117.953292 ELLIS AVE
135 CB-E7048 33.690831 -117.953963 BROOKHURST ST
136 CB-E7060 33.694039 -117.953473 BROOKHURST ST
137 CB-F1002 33.730556 -117.945747 EDINGER AVE
138 CB-F1010 33.731269 -117.937447 EUCLID ST
139 CB-F1011 33.73104 -117.936902 EUCLID ST
140 CB-F1012 33.73124 -117.937135 EUCLID ST
141 CB-F3005 33.716511 -117.941534 MILE SQUARE PARK
142 CB-F4003 33.712779 -117.944098 EASEMENT
143 CB-F4007 33.712819 -117.942847 LOS JARDINES WEST
144 CB-F4008 33.712731 -117.942741 LOS JARDINES WEST
145 CB-F4030 33.70946 -117.943562 SLATER AVE
146 CB-F5056 33.701956 -117.94165 TALBERT AVE
147 CB-F5057 33.701688 -117.945085 TALBERT AVE
148 CB-F5058 33.701687 -117.944791 TALBERT AVE
149 CB-F5060 33.701694 -117.944312 TALBERT AVE
150 CB-F5062 33.701698 -117.943887 TALBERT AVE
151 CB-F5066 33.701705 -117.942151 TALBERT AVE
152 CB-F6002 33.695566 -117.943828 EASEMENT
153 CB-F6003 33.696661 -117.943836 LAWSON RIVER AVE
154 CB-F6004 33.69677 -117.942017 LAWSON RIVER AVE
155 CB-F6005 33.696812 -117.943908 EASEMENT
156 CB-F6007 33.69779 -117.941504 SPENCER AVE
157 CB-F6072 33.694294 -117.945285 ELLIS AVE
158 CB-F6074 33.700306 -117.940067 KALAMA RIVER AVE
159 CB-F6075 33.700192 -117.940064 EASEMENT
160 CB-G2014 33.725983 -117.937088 NEWHOPE ST
161 CB-G3011 33.720649 -117.937033 EUCLID ST
162 CB-G3018 33.716588 -117.9304 WARNER AVE
163 CB-G3025 33.716557 -117.935136 WARNER AVE
164 CB-G3026 33.716551 -117.936062 WARNER AVE
165 CB-G3027 33.716556 -117.936709 WARNER AVE
166 CB-G3030 33.717982 -117.93687 TILTON CIR
167 CB-G4001 33.710318 -117.930117 EASEMENT
168 CB-G4004 33.709257 -117.932233 SLATER AVE
169 CB-G4005 33.712783 -117.93255 MT HERRMANN ST
170 CB-G4006 33.711655 -117.934328 MT WYNNE CIR
171 CB-G4007 33.711645 -117.934139 MT WYNNE CIR
172 CB-G4010 33.711073 -117.932342 MT HERRMANN ST
173 CB-G4011 33.711049 -117.93244 MT HERRMANN ST
174 CB-G4013 33.709254 -117.932724 MT HERRMANN ST
175 CB-G4016 33.709271 -117.930513 EASEMENT
176 CB-G4030 33.714656 -117.936969 EUCLID ST
177 CB-G4034 33.713815 -117.936955 EUCLID ST
178 CB-G4040 33.711796 -117.936918 EUCLID ST
179 CB-G4044 33.710975 -117.936907 EUCLID ST
180 CB-G4053 33.714617 -117.928307 NEWHOPE ST
181 CB-G4057 33.714016 -117.928523 NEWHOPE ST
182 CB-G4058 33.713933 -117.928597 NEWHOPE ST
183 CB-G4059 33.713841 -117.928595 NEWHOPE ST
184 CB-G4060 33.713272 -117.928544 NEWHOPE ST
185 CB-G4062 33.712825 -117.928536 NEWHOPE ST
186 CB-G4063 33.71218 -117.928536 NEWHOPE ST
187 CB-G4064 33.712182 -117.928271 NEWHOPE ST
188 CB-G4066 33.711438 -117.928259 NEWHOPE ST
189 CB-G4068 33.710435 -117.928246 NEWHOPE ST
190 CB-G4069 33.709552 -117.928238 NEWHOPE ST
191 CB-G4070 33.709529 -117.928494 SLATER AVE
192 CB-G4224 33.710839 -117.930506 NEWHOPE ST
193 CB-G4269 33.713849 -117.932683 MT HOPE ST
194 CB-G4273 33.713904 -117.932836 MT HOPE ST
195 CB-G4283 33.715019 -117.932699 MT HOPE ST
196 CB-G4286 33.715032 -117.932841 MT HOPE ST
197 CB-G4290 33.715211 -117.932941 MT HOPE ST
13

Page 279 ends

City of Fountain Valley
Potential CBs for CPS-Mod
Source: WSP
198 CB-G4292 33.715846 -117.932657 MT HOPE ST
199 CB-G5002 33.707364 -117.928264 NEWHOPE ST
200 CB-G5003 33.707402 -117.928485 NEWHOPE ST
201 CB-G5006 33.708997 -117.928236 NEWHOPE ST
202 CB-G5007 33.708966 -117.928469 NEWHOPE ST
203 CB-G5011 33.702057 -117.932357 TALBERT AVE
204 CB-G5015 33.702043 -117.93426 TALBERT AVE
205 CB-G5017 33.702023 -117.936614 TALBERT AVE
206 CB-G5027 33.70435 -117.936649 SOUTHPARK AVE
207 CB-G5031 33.705758 -117.928351 PRIVATE
208 CB-G5032 33.705668 -117.928848 PRIVATE
209 CB-G5034 33.705657 -117.929685 PRIVATE
210 CB-G5038 33.705626 -117.929962 NEWHOPE ST
211 CB-G5040 33.705801 -117.930048 NEWHOPE ST
212 CB-G5043 33.707153 -117.93274 GRACE AVE
213 CB-G5044 33.707002 -117.93274 GRACE AVE
214 CB-G5046 33.70572 -117.932361 MT HERRMANN ST
215 CB-G5047 33.705701 -117.932537 MT HERRMANN ST
216 CB-G5049 33.70533 -117.93237 PRIVATE
217 CB-G5050 33.705402 -117.932385 NEWHOPE ST
218 CB-G5052 33.704924 -117.933601 NEWHOPE ST
219 CB-G5053 33.705063 -117.933749 EASEMENT
220 CB-G5054 33.705163 -117.933741 EASEMENT
221 CB-G5059 33.708919 -117.932383 MT HERRMANN ST
222 CB-G5060 33.708917 -117.932605 MT HERRMANN ST
223 CB-G5065 33.709242 -117.934645 SLATER AVE
224 CB-G5068 33.709393 -117.936883 EUCLID ST
225 CB-G5082 33.703892 -117.934374 SOUTHPARK AVE
226 CB-G5094 33.707136 -117.934584 GRACE AVE
227 CB-G5095 33.706986 -117.934645 GRACE AVE
228 CB-G5096 33.707108 -117.936689 GRACE AVE
229 CB-G5120 33.708878 -117.936846 EUCLID ST
230 CB-G6001 33.698919 -117.935436 EUCLID ST
231 CB-G6002 33.698778 -117.935434 EUCLID ST
232 CB-G6004 33.699113 -117.935529 EUCLID ST
233 CB-G6005 33.699187 -117.935443 EUCLID ST
234 CB-G6006 33.699328 -117.935269 EUCLID ST
235 CB-G6008 33.699281 -117.936025 EUCLID ST
236 CB-G6011 33.699805 -117.936181 EUCLID ST
237 CB-G6015 33.69862 -117.935664 EUCLID ST
238 CB-G6016 33.698643 -117.935821 EUCLID ST
239 CB-G6018 33.698734 -117.935924 EUCLID ST
240 CB-G6020 33.69916 -117.936296 EUCLID ST
241 CB-G6025 33.695316 -117.935266 ELLIS AVE
242 CB-G6900 33.699934 -117.93694 NEWHOPE ST
243 CB-G6901 33.700037 -117.936621 NEWHOPE ST
244 CB-G6902 33.700042 -117.936301 NEWHOPE ST
245 CB-G6903 33.700329 -117.935839 NEWHOPE ST
246 CB-G6904 33.700763 -117.935028 NEWHOPE ST
247 CB-G6905 33.700164 -117.935634 NEWHOPE ST
248 CB-H2009 33.729066 -117.923977 EDINGER AVE
249 CB-H2010 33.727525 -117.921053 EDINGER AVE
250 CB-H2011 33.727726 -117.922074 EDINGER AVE
251 CB-H2013 33.727797 -117.92227 EDINGER AVE
252 CB-H2015 33.727952 -117.922627 EDINGER AVE
253 CB-H2017 33.728166 -117.923009 EDINGER AVE
254 CB-H2021 33.726101 -117.923656 SAN JACINTO ST
255 CB-H2024 33.725607 -117.921563 EASEMENT
256 CB-H2041 33.730907 -117.923409 LILAC AVE
257 CB-H2043 33.731237 -117.923312 LILAC AVE
258 CB-H2044 33.73114 -117.923384 LILAC AVE
259 CB-H2045 33.731097 -117.923413 LILAC AVE
260 CB-H2052 33.730418 -117.928714 NEWHOPE ST
261 CB-H2074 33.723804 -117.928296 HEIL AVE
262 CB-H3021 33.716359 -117.924394 WARNER AVE
263 CB-H3022 33.716402 -117.924529 WARNER AVE
14

Page 280 ends

City of Fountain Valley
Potential CBs for CPS-Mod
Source: WSP
264 CB-H3024 33.716611 -117.926053 WARNER AVE
265 CB-H3028 33.7162 -117.928339 NEWHOPE ST
266 CB-H3042 33.723921 -117.919659 HARBOR BLVD
267 CB-H3044 33.723622 -117.919659 HARBOR BLVD
268 CB-H3045 33.722888 -117.919652 HARBOR BLVD
269 CB-J1005 33.731204 -117.919725 HARBOR BLVD
270 CB-J2009 33.730944 -117.919584 HARBOR BLVD
271 CB-J2014 33.727733 -117.919688 HARBOR BLVD
272 CB-J2016 33.727551 -117.919424 HARBOR BLVD
273 CB-J2017 33.72727 -117.91953 HARBOR BLVD
274 CB-J2021 33.724893 -117.91967 HARBOR BLVD
275 CB-J2102 33.722634 -117.918461 PRIVATE
276 CB-C2033 33.730453 -117.969722 EDINGER AVE
277 CB-C2037 33.723911 -117.963166 BUSHARD ST
278 CB-C2039 33.723908 -117.963395 BUSHARD ST
279 CB-C3027 33.716803 -117.96308 BUSHARD ST
280 CB-C3028 33.717155 -117.963084 BUSHARD ST
281 CB-C4019 33.71585 -117.96529 WARNER AVE
282 CB-C4033 33.714282 -117.963058 BUSHARD ST
283 CB-C5002 33.708691 -117.962835 SLATER AVE
284 CB-C5045 33.701659 -117.966434 OAK ST
285 CB-C6043 33.700363 -117.970116 THIRD ST
286 CB-C6044 33.700377 -117.969969 THIRD ST
287 CB-D4007 33.709068 -117.956069 SLATER AVE
288 CB-D4037 33.708741 -117.961251 SLATER AVE
289 CB-D7043 33.692303 -117.95662 FINCH AVE
290 CB-E1017 33.730689 -117.949607 EDINGER AVE
291 CB-E3002 33.72363 -117.954278 BROOKHURST ST
292 CB-E4004 33.710483 -117.951483 SAN MATEO ST
293 CB-E4046 33.710531 -117.950743 ALLEY "E"
294 CB-E4047 33.71046 -117.950583 ALLEY "E"
295 CB-E6036 33.697739 -117.954068 BROOKHURST ST
296 CB-E7021 33.69406 -117.951885 ELLIS AVE
297 CB-F1001 33.730802 -117.945721 EDINGER AVE
298 CB-F4031 33.709276 -117.943506 SLATER AVE
299 CB-F4032 33.709552 -117.943153 SLATER AVE
300 CB-F5052 33.701934 -117.945378 TALBERT AVE
301 CB-F5055 33.701952 -117.942082 TALBERT AVE
302 CB-F6034 33.694154 -117.937593 ELLIS AVE
303 CB-F6036 33.694155 -117.937943 ELLIS AVE
304 CB-F6038 33.694147 -117.938805 ELLIS AVE
305 CB-F6040 33.694146 -117.939099 ELLIS AVE
306 CB-F6052 33.694134 -117.941488 ELLIS AVE
307 CB-F6054 33.694131 -117.941707 ELLIS AVE
308 CB-F6056 33.694127 -117.942099 ELLIS AVE
309 CB-F6060 33.694125 -117.943217 ELLIS AVE
310 CB-F6063 33.694119 -117.943635 ELLIS AVE
311 CB-F6065 33.694113 -117.94427 ELLIS AVE
312 CB-F6067 33.694113 -117.9446 ELLIS AVE
313 CB-F6069 33.694108 -117.945228 ELLIS AVE
314 CB-G2013 33.725872 -117.93684 BLUE ALLIUM AVE
315 CB-G3015 33.719772 -117.937023 EUCLID ST
316 CB-G5021 33.703585 -117.934681 SOUTHPARK AVE
317 CB-G5022 33.703943 -117.934596 SOUTHPARK AVE
318 CB-G5072 33.704622 -117.93439 PRIVATE
319 CB-H2033 33.728936 -117.92422 EASEMENT
320 CB-J2008 33.731081 -117.919578 HARBOR BLVD
15

Page 281 ends

CPS-Mod™
Patented
CPS Modular Series
CA State Water Board Certified - FULL CAPTURE SYSTEM
_____________________________________________________________________________________________________________________________ G2 CPS-Mod™ Full-Capture 5mm perforated screens with
patented modular design for easy installation inside catch basins.

Approved by the California State Water Board, LACDPW, OCPW, OCTA, SF Bay RWQCB & agencies everywhere. The CPSMod™ prevents trash, pollutants, and debris from entering waterways through the catch basin outlet pipe.
• Made from 304 Stainless Steel for extended life.
• Sized to meet or exceed 1-year, 1-hour storm.
• Modular to easily fit all catch basin types.
• Custom designed and fabricated to each catch basin to ensure compliance of no gaps > 5mm in size.
• Professionally installed by G2 or a trained & certified installer. • Quick Release Removable (optional)
• Mosquito & Vector Abatement Deflector (where required) Recommended with G2’s ARS CamLock Series™
16

Page 282 ends

CPS-Mod™
Patented
CPS Modular Series
FULL CAPTURE SYSTEM Certified by
California State Water Board & Regional Water Quality Control Boards G2 CPS-Mod™ Connector Pipe Screen
Function:
• Captures all pollutants 5mm and larger that enter the catch basin. • Pollutants prevented from exiting the catch basin:
➢ Primary: plastics (food containers, bags, bottles, straws); trash (paper, cigarette butts, cans); vegetative debris (leaves, branches, landscaping); other all other objects. ➢ Secondary: pollutants absorbed by or attached to the Primary pollutants. Including from vehicles (hydrocarbons, fluids, copper, cadmium, zinc, tires, etc.), pathogens / bacteria, pesticides, nutrients, organic compounds, sediment toxicity, etc.

Design, Flexibility, & Approval:
• Custom designed and fabricated for each catch basin and its unique features. • Fits any standard catch basin with discharge pipe on front, back, or side wall. • Approved by State Waterboard, Los Angeles County DPW, City of LA, Orange County DPW, OCTA, San Francisco Bay Area Water Resource Board, and agencies everywhere.

Material & Fabrication:
• Made of 304 stainless steel; 14 gauge with 5mm holes. • “Made in California, USA”
Value:
• Low initial capital investment relative to other storm water quality BMPs. Lower long-term and total lifetime costs vs. any water quality BMP or taking no action. • Requires no replacement filters or parts.
• G2’s CPS-Mod™ in combination with the G2’s ARS-CL™ creates the most effective BMP system and greatest value.

Public Outreach:
• Residents aware of the CPS-Mod™ installed in their local catch basin perceive it to be an environmental benefit and demonstrates an environmentally conscious community.

Recommended with G2’s ARS CamLock Series™ screens, for the most complete full capture system. 17

Page 283 ends

CPS-Mod™
Patented
CPS Modular Series FULL CAPTURE SYSTEM
18

Page 284 ends

NOTES: TOP DEFLECTOR, AS NEEDED SUPPORT BRACKET WHEN A 48". BOTTOM TRIM SIZED TO FIT, AS NEEDED, SEE SHEET #3. 2 G2 Construction, Inc. Sheet 1 of 6 Connector Pipe Screen (CPS) NOT TO SCALE A *Hb *Hs A* B* (typ) *Hs/2 (typ) *Hs/2 (typ) Full Capture Model: G2 CPS - Modular Patented VI A 5 mm Opening Screen 14 Gauge *L = A A 5 mm Opening Screen 14 Gauge *L = A+2B B (typ) A 5 mm Opening Screen 14 Gauge *L = A+B B 3 3 1 2 1 Screen made of 304 Stainless Steel 14 gauge, with 5 mm openings.

Manufactured and Installed Exclusively by:

Office (714) 748- 4242
CA Lic. # 801253 A, C-8, C-60
G2 Construction, Inc. [email protected] Santa Ana, CA 92705 1352 E. Borchard Avenue
19

Page 285 ends

20

Page 286 ends

Device Filtered Flow Rate Calculation
What are the filtered flow rates for G2 Construction devices, and how are they determined? G2 Construction (G2) reports filtered flow rates based on hydrology modeling and testing with water flows.

Our design team applies the same formula used by the Los Angeles County Department of Public Works (LACDPW) to calculate filtered CFS (cubic feet per second) in their TECHNICAL REPORT on Connector Pipe Screen Design and Full Capture TMDL Compliance (April 2007). This technical report was submitted and approved by the Los Angeles Regional Water Quality Control Board.

CPS-Mod ™ CFS Formula:

Where:

Qscreen= Max CFS filtered thru screen.
c = Coeficent of the screen orifice for friction & turbulence.

A = Area of the screen.
g = Gravity.
h = Differential head of upstream vs. downstream side of screen.

Using this formula, G2 calculates the filtered CFS for different designs, and with different assumptions. Catch basin discharge pipes are designed and sized to transport the area’s stormwater from the catch basin. G2 designs each CPS-Mod™ based on the size and location of the discharge pipe, and size and configuration of the catch basin.

In addition to modeling filtered CFS with formulas, G2 has tested our devices with flowing water.

Results found that actual flowing water CFS rates were 90-95% of the modeled formulas.

However, G2 realizes there are many factors that can reduce filtration rates not included in the formulas. We take a conservative approach by applying a size factor that calculates filtration rates for a smaller device that estimated, typically 85%. This provides a safety factor.

G2 knows there are real world variables that will reduce flow rates, and screen blockage is the most common issue. For that reason, G2 designs assume that a percentage of the screen will be blocked with trash or debris, and our designs typically assume between 10-30% of the screen cannot pass water. This directly reduces the assumed filtration rates.

Each of G2’s ARS-CL™ screens varies in curb opening width between 3.5’ to 5’, and is designed to unlock and open when 4” of water pools in front of the catch basin. The same formula is used to determine device filtered flow rates. Similarly, our designed filtered flow rates for the closed ARSCL™ screen assumes there is some screen blockage. LACDPW has performed hydrology tests on the ARS-CL™ at the San Gabriel dam test facility and has approved the design.

Device Filtered Flow Rate Testing with Water
G2’s devices have been testing using flowing water to simulate real-world conditions. Attached is a report of filtration testing performed on the patented CPS-Mod™. This test and the results were included in G2’s application to the State Waterboard that resulted in the certification of G2’s CPSMod™ and GITS™ devices as Full Capture Systems. 21

Page 287 ends

&ŝůƚĞƌĞĚ&ůŽǁZĂƚĞdĞƐƚŝŶŐͲ'ϮW^ͲDŽĚ:ĂŶ͘ϮϬϭϵ ϭ
),/7(5(')/2:5$7(7(67,1*
'HYLFH7HVWHG
*&RQVWUXFWLRQ±&360RGŒ
)LOWHUHG)ORZUDWH
&)6
7HVWLQJIRU*&360RGŒ
6XPPDU\
/DEWHVWLQJRI*&360RGŒZDVSHUIRUPHGWRGHWHUPLQHILOWHUHGIORZUDWHV &)6
LQD
VLPXODWHGLQKRXVHFDWFKEDVLQV\VWHP5HVXOWVVKRZHGWKDWDQDYHUDJHVL]HG*&36 VTIWVFUHHQ

ZLOOILOWHUPRUHWKDQ&)6RIZDWHUZKHQFOHDQ7KLVILOWHUHGIORZUDWHH[FHHGVWKHSHDNIORZUDWHRIWKH RQH\HDURQHKRXUVWRUPHYHQWIRUPRVWFDWFKEDVLQVZLWKGLVFKDUJHSLSHOHVVWKDQ´5HVXOWVDOVR VKRZHGWKDWZKHQRIWKHVFUHHQLVEORFNHGLWZLOOFRQWLQXHWRILOWHUDWOHDVW&)6 7KHSULPDU\OLPLWDWLRQRIWKHWHVWLQJZDVGXHWROLPLWHGVXSSO\RIZDWHU

JDOORQV
ZKLFKZDVUHF\FOHG
GXULQJWHVWLQJ)RUDOOWHVWVWKH*&36VXFFHVVIXOO\ILOWHUHGDOOZDWHUIORZVZLWKRXWRYHUIORZLQJWKH VFUHHQ,IKLJKHU&)6IORZUDWHVZHUHDYDLODEOHGXULQJWHVWLQJWKHQKLJKHUPD[LPXPILOWHUHGIORZUDWHV ZRXOGKDYHUHVXOWHG
0HWKRGRORJ\
*EXLOWDQLQKRXVHZDWHUIORZV\VWHPZLWKWKUHHFKDPEHUV 
 :DWHU6RXUFH&KDPEHUKROGVXSWRFXELFIHHWRIZDWHU

JDOORQV

 7HVW&KDPEHULVDVLPXODWHGFDWFKEDVLQZKHUHWKHWHVWHG&36ZDVLQVWDOOHG  5HF\FOH7DQNFROOHFWVWHVWHGZDWHU
FXELFIW

JDO
ZKHUHLWLVSXPSHGEDFNXSWRWKH
VRXUFHFKDPEHU
7HVW&KDPEHU'LPHQVLRQV


7HVWHG*&360RGŒGHYLFH


7KLV&36ZDVWHVWHGXQGHUWZRVFHQDULRV

 VFUHHQEORFNDJH
 EORFNDJH7KHERWWRPRIWKHVFUHHQZDVWLJKWO\FRYHUHGZLWKLPSHUPHDEOHSODVWLF EDUULHU
22

Page 288 ends

&ŝůƚĞƌĞĚ&ůŽǁZĂƚĞdĞƐƚŝŶŐͲ'ϮW^ͲDŽĚ:ĂŶ͘ϮϬϭϵ Ϯ
)RUHDFKWHVWXSWRFXELFIHHWIORZHGIURPWKHZDWHUVRXUFHFKDPEHULQWRWKHWHVWFKDPEHUDQG WKURXJKWKH&36
7HVW5HVXOWV


,QDOOWHVWVFHQDULRVWKH*&36ILOWHUHGRIWKHZDWHUZLWKRXWZDWHUULVLQJDQGRYHUIORZLQJWKHVFUHHQ $QDO\VLV
7KH&36FRXOGKDYHILOWHUHGPRUHZDWHULILWZDVDYDLODEOHZLWKRXWRYHUIORZLQJ7KHWHVWHG* &36KDGDILOWHUHGIORZUDWHWKDWH[FHHGHG&)6SHUVTXDUHIRRWRIVFUHHQ &RQFOXVLRQ
7HVWLQJVKRZHGWKDW*¶V&36RIDYHUDJHVL]H
VTIWVFUHHQ
ILOWHUVZDWHULQH[FHVVRI
&)67KLVUDWHH[FHHGVWKHIXOOFDSWXUHUHTXLUHPHQWVRIPRVWFDWFKEDVLQVZLWKDGLVFKDUJHSLSHGLDPHWHU OHVVWKDQ´7KHSULPDU\OLPLWDWLRQRIWKLVWHVWZDVWKHLQDELOLW\WRVXSSO\KLJKHUZDWHUYROXPHVDQGIORZ UDWHV)XUWKHUWHVWLQJLVUHFRPPHQGHG
3KRWRVRI&)67HVWV

*&)67HVWHU
FKDPEHUV\VWHP
:DWHU6RXUFH&KDPEHU &)
*DOORQV


23

Page 289 ends

&ŝůƚĞƌĞĚ&ůŽǁZĂƚĞdĞƐƚŝŶŐͲ'ϮW^ͲDŽĚ:ĂŶ͘ϮϬϭϵ ϯ
6FHQDULR
%ORFNDJHRI6FUHHQ6FHQDULR %ORFNHGZLWKSODVWLF

%HIRUH7HVW

7HVW&KDPEHU'LVFKDUJH3LSH 
'XULQJ7HVW

24

Page 290 ends

CREDENTIALS & QUALIFICATIONS
Background & Experience
G2 Construction started operations in Orange County in 2001 with strong foundations in welding, concrete construction, shop fabrication, and field work. The company began designing, fabricating, and installing catch basin curb opening automatic retractable screens (ARS) and full-capture connector pipe screens (CPS) and other stormwater protection devices for Los Angeles County Department of Public Works (LACDPW) and southern California municipalities in 2002.

Since then, G2 has fabricated and installed tens of thousands of approved catch basin inserts and screen covers on hundreds of stormwater projects in the Orange County and Los Angeles area. G2 offers complete solutions by performing project evaluation and consultation on stormwater devices and then designing, fabricating, and installing highly effective devices to meet and exceed specifications.

G2’s General Credentials
• Orange County Public Works (OCPW) and OCTA M2 Environmental Cleanup Program approved storm water quality devices:
o CPS-Mod™ patented Full Capture System approved by State Waterboard. o GITS™ grated inlet trash screen Full Capture System approved by State Waterboard.
o ARS-CL™ patented automatic retractable screen.
• OCPW ranks G2 Construction as their #1 stormwater device provider (2020 RFP & 2014 RFP). Awarded Master Purchase Agreements covering 2015 - 2025. • Los Angeles County Dept. of Public Works & City of Los Angeles Bureau of Sanitation approved products: ARS-CL™& CPS-Mod™
• Association of Bay Area Governments (ABAG) Approved products (all) • California Contractor Licenses: A (General Contractor), C-8 (Concrete), C60 (Welding) • Orange County Local Small Businss (OCLSB) certified. [see Attached] • Disadvantaged Business Entity (DBE) certified. [see Attached] • Minority Business Entity (MBE) certified. [see Attached] • Small Business Entity (SBE) certified.
25

Page 291 ends

G2’s Technical Expertise
G2 Construction is at the forefront of the stormwater device industry. G2 has designed and fabricated the most advanced stormwater protection devices to solve the needs of public agencies and private developers. Our advanced methodologies for fabrication and installation have made G2 the industry leader in providing custom-fitted stainless steel catch basin inserts and curb opening screen covers.

G2 has developed a high degree of technical expertise by incorporating all phases (evaluation, consulting, design, fabrication, installation, reporting) of stormwater projects, and learning from hundreds of installed projects over the years. We have become extremely familiar with all the procedures required for success.

Our depth of knowledge and technical experience has been the result of solving many dozens of challenges and constraints of projects over two decades. This includes, among many others, solving for all the various catch basin types and sizes and conditions that we face in the field.

We’ve learned something new from most projects and most clients. Our experiences with cities in Orange County and throughout southern California have been very good for many years.

Because many cities have developed an advanced knowledge of the industry and recognize quality and value, it makes G2’s work more effective, efficient, and valuable.

Fortunately, G2’s strong culture for project management helps us to organize projects effectively and manage diverse teams. This has enabled G2 to have a 100% rate of success for completing projects and within budget.

G2 provides its technical expertise and installation services throughout California and focuses on the Orange County and Los Angeles County regions.

Letters of Reference
G2’s customers provide additional insights into our qualifications. Attached are a few letters of our customer letters of recommendation.
26

Page 292 ends

CITY OF LAGUNA HILLS
24035 El Toro Road •Laguna Hills, California 92653 • (949) 707-2600 • FAX (949) 707-2633 Website: www.LagunaHillsCA.gov
Feb. 3, 2025
Orange County Public Works
Procurement Services
601 North Ross Street
Santa Ana, CA 92701
SUBJECT: City of Laguna Hills – Letter of Recommendation for G2 Construction, Inc.

TRASH AND DEBRIS CAPTURE DEVICES – RFP# 080-2736403-WH
To Whom It May Concern:

The City of Laguna Hills has contracted with G2 Construction (G2) since 2007 to design, fabricate, and install their ARS-CL and CPS-Mod trash and debris screens throughout the City. Between 2012 - 2024, G2 installed 11 annual City projects that won OCTA Environmental Cleanup Program’s Project X grant funds. They have installed over 2,000 ARS screens and 370 CPS devices in our catch basins.

The City continues to select G2 Construction because their devices successfully prevent trash, debris, and vegetation from entering our storm drain system and watershed. The City plans to work with G2 again this year to install our Phase XII OCTA grant.

For each project G2 has provided a simple end-to-end solution that includes field evaluations and measurements of catch basins, custom design and fabrication of their devices, installation, photos, support documentation, and warranty. G2’s work has always been on schedule, on budget, and performed without any problems.

G2 has also assisted the City with an inventory of catch basin devices, and provided information critical to our Project X applications.

I am pleased to offer this letter of recommendation for G2 Construction. The City finds their trash and debris devices to be very effective and of good value, and their installation work to be of high quality. The company has been very professional and dependable in their interactions with the City. We look forward to working with G2 Construction on future projects.

You may contact me with any questions at [email protected] or 949/707-2655.

Sincerely,
Joe Ames, P.E., T.E.

Public Works Director/City Engineer
27

Page 293 ends

City of Mission Viejo
Public Works Department
200 Civic Center • Mission Viejo, California 92691 949/470-3056 http://www.cityofmissionviejo.org
Bob Ruesch
Mayor
Wendy Bucknum
Mayor Pro Tem
Brian Goodell
Councilmember
Trish Kelley
Councilmember
Cynthia Vasquez
Councilmember
January 17, 2025
Subject: G2 Construction
To Whom It May Concern:

G2 Construction has consistently provided quality services for the City of Mission Viejo since 2014 when it first installed Trash and Debris Capture Devices in Mission Viejo’s catch basins.

Since then, the City has contracted with G2 every year to install more G2 devices and will again in 2025.

G2 provides the Full Capture System CPS devices and ARS curb-opening screens the City prefers to prevent pollutants and debris from entering its storm drain systems. G2 is a full-service entity providing everything from field evaluations to custom device design, device fabrication, and installation. G2 is also instrumental in assisting the City with grant funding applications and the preparation of grant reimbursement requests.

G2 Construction is professional, experienced, expedient and reliable. Work is always performed quickly and efficiently and within budget.

They are a pleasure to work with and the City looks forward to many more projects with G2 Construction.

Regards,

MARK CHAGNON
City Of Mission Viejo
Director Of Public Works
28

Page 294 ends

CITY HALL 211 EIGHTH STREET
SEAL BEACH, CALIFORNIA 90740
(562) 431-2527 • www.sealbeachca.gov
October 23, 2024
Orange County Public Works
Procurement Services
601 N. Ross Street
Santa Ana, CA 92701
SUBJECT: TRASH AND DEBRIS CAPTURE DEVICES – REQUEST FOR PROPOSAL City of Seal Beach – Recommendation Letter
To Whom It May Concern:

This letter of recommendation is in response to Orange County Public Works’ Trash and Debris Capture Devices RFP. In my current capacity as the City of Seal Beach’s Public Works Director, I have had the pleasure of working with G2 Construction, Inc. (G2) for the installation of multiple capture devices.

OCPW’s master agreement in partnership with OCTA’s Environmental Cleanup Program has allowed many local agencies mitigate transportation-related pollutants. Through this, G2 has provided a seamless approach to successful project delivery, which I have no reservations recommending. The following is a recent list of services performed under my purview:
 2023 Seal Beach CPS -Mod (170 systems) + ARS (48 screens)  2020 Seal Beach CPS-Mod (53 systems) + ARS (95 screens)  2019 Seal Beach CPS-Mod (55 systems) + ARS (127 screens) Should you have any questions regarding G2’s performance, please feel free to reach out at (562) 431- 2527, x1322 or [email protected].

Sincerely,
Iris Lee
Director of Public Works
29

Page 295 ends

CITY OF FULLERTON
_______________________________________________________________________________________________________________________________ Public Works Department – Engineering Division

THE EDUCATION COMMUNITY
303 West Commonwealth Avenue, Fullerton, California 92832-1775 (714) 738-6845 • www.cityoffullerton.com
November 7, 2024
RE: Orange County Transportation Authority Measure M2 Environmental Cleanup Tier 1 Grant Program Fiscal Year 2024-2025
City of Fullerton - Letter of Recommendation
The City of Fullerton (City) has worked with G2 Construction Inc (G2) on every Orange County Transportation Authority Measure M2 Environmental Cleanup Tier 1 Grant the City has applied to since 2014. As the City’s primary contractor for installing the full capture trash and debris devices, G2 has installed approximately 495 full capture trash and debris devices to date within the City.

Over the years, G2 has far exceeded the City’s expectation and proven to be professional and masters of their craft. With each project, G2 continues to provide great service including detailed field reviews, photos and supporting documentation, and continuous communication. Each project is completed on time and within budget.

Furthermore, I am impressed with the service G2 provides and I am pleased to recommend G2 Construction, Inc. The City is looking forward to working with G2 on next year’s Catch Basin Connector Pipe Screen Project.

Feel free reach out to me for any questions by phone 714-738-6886 or by email [email protected].

Sincerely,
Melissa Rendon, P.E.

Civil Engineer
City of Fullerton
Public Works Engineering Department
30

Page 296 ends

31

Page 297 ends

Public Works 910 Calle Negocio San Clemente CA 92673
www.san-clemente.org
City of San Clemente
Engineering Division
Niki Beach, Environmental Programs Analyst
Phone: (949) 361-8354
[email protected]
February 13, 2025
Subject: Trash Capture Device Installations by G2 Construction To Whom It May Concern:

I wholeheartedly recommend G2 Construction, Inc. (G2) following the excellent service they provided in the City of San Clemente’s most recent 2024 contract with them for the installation of trash capture devices on 78 storm water inlets.

The G2 team demonstrated expertise in the products they sell and install, as well as a commitment to delivering projects under budget and on a schedule that minimized both traffic impacts to the public and City staff time. In addition to quality, customized products, G2 provided substantial technical assistance that they have incorporated into their contract pricing. As a project manager new to the world of trash capture devices, I especially appreciated the guidance of G2 in ensuring that the work they so efficiently completed would meet the requirements for the OCTA grant funding that we obtained for the project, and also drive us closer to regulatory compliance with the Statewide Trash Amendments.

To date, G2 has installed trash capture devices on 244 inlets within the City’s jurisdiction. Although I did not oversee the previous phases of trash capture devices, I can attest that the City has had no major maintenance or quality issues with the devices constructed and installed by G2 since they first began working under contract for the City in 2022.

If you have any additional questions about G2’s work for the City, please don’t hesitate to reach out to me.

Sincerely,
Niki Beach
Environmental Programs Analyst
32

Page 298 ends

BfilNA@>PARK
DATE:

TO:

FROM:

SUBJECT:

January 30, 2025
Orange County Public Works
Joe Hunt, Senior Management Analyst
Reference for G2 Construction
Department of Public Works
The City of Buena Park has worked with G2 Construction since 2015 to install CPS, ARS, and GITS devices on storm drains throughout the City's public right-of-way. The City has maintained a good working relationship with G2 Construction during that time and our projects have been completed on time and at maximum value to the City. I can recommend G2 Construction for future projects with your or other organizations based on our experiences. We have completed 4 projects with G2 Construction, resulting in over 1,500 screens installed.

Hunt, Senior Management Analyst
[email protected]
6650 Beach Blvd
Buena Park, CA 90622
(714 )562-3685
33

Page 299 ends

zero waste • zero wasted water

BOARD OF PUBLIC WORKS

MEMBERS

VAHID KHORSAND

PRESIDENT

JENNY CHAVEZ

VICE PRESIDENT

JOHN GRANT

PRESIDENT PRO TEMPORE
STEVE S. KANG

COMMISSIONER
FAITH I. MITCHELL

COMMISSIONER

ELYSE MATSON

EXECUTIVE OFFICER

CITY OF LOS ANGELES

CALIFORNIA

KAREN BASS
MAYOR

BUREAU OF SANITATION

BARBARA ROMERO

DIRECTOR AND GENERAL MANAGER
VACANT

CHIEF OPERATING OFFICER

SARAI BHAGA

CHIEF FINANCIAL OFFICER

JULIE ALLEN

NICOLE BERNSON

MAS DOJIRI
ALEXANDER E. HELOU

ROBERT POTTER

ASSISTANT DIRECTORS

HI SANG KIM

ACTING HYPERION EXECUTIVE PLANT MANAGER
–– 1149 SOUTH BROADWAY, 9TH FLOOR
LOS ANGELES, CA 90015
TEL: (213) 485-2210
WWW.LACITYSAN.ORG

AN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER
Recyclable and made from recycled waste

February 4, 2025

ELECTRONIC MAIL
To Whom It May Concern:

LETTER OF RECOMMENDATION FOR G2 CONSTRUCTION, INC.

G2 Construction (G2) has designed, fabricated, and installed thousands of their trash capture devices in the City of Los Angeles since the bureau of Sanitation and Environment (LASAN) approved their CPS inserts and ARS curb opening screens in 2013. G2’s devices are very effective at capturing trash, their installations are of high quality, and the company is professional and reliable.

In 2023, LASAN awarded G2 Construction a 10-year $8,000,000 contract to fabricate and install Full Capture Catch Basin Inserts and Curb Opening Screen Covers (G2’s CPS-Mod and ARSCL devices). G2 is one of only two approved vendors that LASAN has found acceptable to provide both the catch basin connector pipe screens (CPS) and automatic retractable screens (ARS) in City of Los Angeles public right-of-way catch basins.

G2’s installation crews are highly skilled and communicate well with inspectors, their work is performed on time and within budget, and their project management has been efficient. Their personnel are very good at providing all required documentation and making the process easy.

The approval of G2 devices by LASAN lead to the installation of their CPS-Mod and ARS-CL devices on important City projects such as:

LA World Airports Roadways (LAWA RUE). 2024
LA Metro Westside Purple Line. 2024
LA Metro Regional Connector Corridor. 2023
LA Metro LAX Corridor Project. 2021
Port of Los Angeles. 2020
Hyperion Treatment Plant Screens. 2016
Branford Dry Well project. 2016
City of LA TMDLS – Machado Lake. 2015-16
LA Metro Exposition Rail Line. 2015
I-405 Widening Project. 2014
34

Page 300 ends

Letter of Recommendation – G2 Construction
2/6/2025
Page No. 2
I am pleased to offer this letter of recommendation for G2 Construction. Based on our experience with G2 Construction, I can recommend their products and services.

Sincerely,

JONATHAN BALL
Assistant Division Manager
Watershed Protection Division
LA Sanitation and Environment
JJB/jb
c: Marsa Chan, LASAN
35

Page 301 ends

36

Page 302 ends

37

Page 303 ends

February 14, 2025
Re: Letter of Recommendation for G2 Construction, Inc.

To Whom It May Concern,
G2 Construction has been awarded 6 contracts by the City of San Marino to install their ARSCL and CPS-Mod Full Capture System devices between 2020 and December 2024. Their projects were all successfully completed on time and within budget. G2’s work has been performed professionally, quickly, and with effective communication of their schedule, project status, and solutions to issues.

The City has been pleased with the quality of their installed devices, and G2’s CPS-Mod connector pipe screen is certified as a trash Full Capture System by the State Water Resources Control Board. Both their CPS and ARS devices are approved by LACDPW and will likely be installed in San Marino’s County-owned catch basins in the future.

G2 Construction’s personnel are easy to work with, and very responsive to the City’s requests.

My experience has been very positive, and the company has delivered on their promises to the City.

Based on our experience with G2 Construction, I can recommend their products and services.

Sincerely,
Amber Shah, P.E.

Parks & Public Works Director/City Engineer
2200 Huntington Drive
San Marino, CA 91108
[email protected]
P: (626) 300-0787
38

Page 304 ends

5050 N. Clark Avenue  Lakewood, California 90712  (562) 866-9771 February 6, 2025
Orange County Public Works
Procurement Services
601 North Ross Street
Santa Ana, CA 92701
SUBJECT: G2 Construction, Inc. – Letter of Recommendation To Whom It May Concern:

The City of Lakewood contracted with G2 Construction on three (3) projects to install State Water Board certified CPS-Mod connector pipe screens and GITS grated inlet trash screens.

G2 successfully installed their products in 2016, 2018, and 2023 as part of the City’s FullCapture Catch Basin Insert Program to the satisfaction of the City. G2’s personnel have been very capable, and both projects installed as scheduled.

Our experience with G2 has been very positive, and I can recommend their products and services. Their team has been very professional and responsive to our needs, and they were quick to provide field evaluations of our catch basins and recommendations for our project.

Some of the City’s catch basins were unique and G2 was able to manufacture customized CPSMod devices that allowed us to meet regulations and the City’s water quality objectives.

Please feel free to contact me if you have any additional questions.

Sincerely,
Ms. Konya Vivanti
Environmental Programs Manager
City of Lakewood
5050 Clark Avenue
Lakewood CA, 90712
(562) 866-9771 ext. 2507
[email protected]
39

Page 305 ends

March 28, 2024 CUCP# 41740
Metro File #6371
MR. JOHN ALVARADO
G2 Construction, Inc.
1352 East Borchard Ave
Santa Ana, CA 92705-4413
Subject: Disadvantaged Business Enterprise Certification Dear MR. JOHN ALVARADO:

We are pleased to advise you that after careful review of your application and supporting documentation, the Los Angeles County Metropolitan Transportation Authority (Metro) has determined that your firm meets the eligibility standards to be certified as a Disadvantaged Business Enterprise (DBE) as required under the U.S. Department of Transportation (U.S. DOT) Regulation 49 CFR Part 26, as amended. This certification will be recognized by all of the U.S. DOT recipients in California. Your firm will be listed in the California Unified Certification Program (CUCP) database of certified DBEs under the following specific area(s) of expertise that you have identified on the NAICS codes form of the application package:

NAICS 331491: NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM) ROLLING, DRAWING, AND EXTRUDING NAICS 237310: HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
NAICS 332313: PLATE WORK MANUFACTURING
Your DBE certification applies only for the above code(s). You may review your firms information in the CUCP DBE database which can be accessed at the CUCP website at https://californiaucp.dbesystem.com. Any additions and revisions must be submitted to Metro for review and approval.

In order to ensure your continuing DBE status, you are required to submit an annual update along with supporting documentation. If no changes are noted, then your DBE status remains current. If there are changes, Metro will review to determine continued DBE eligibility. Please note, your DBE status remains in effect unless Metro notifies you otherwise.

Also, should any changes occur that could affect your certification status prior to receipt of the annual update, such as changes in your firm's name, business/mailing address, ownership, management or control, or failure to meet the applicable business size standards or personal net worth standard, please notify Metro immediately. Failure to submit forms and/or change of information will be deemed a failure to cooperate under Section 26.109 of the Regulations.

Metro reserves the right to withdraw this certification if at any time it is determined that it was knowingly obtained by false, misleading, or incorrect information. Your DBE certification is subject to review at any time. The firm thereby consents to the examination of its books, records and documents by Metro.

Congratulations, and thank you for your interest in the DBE program. Should you have any questions, please contact us at (213) 922-2600. For information on Metro contracting opportunities, please visit our website at www.metro.net/connect.

Sincerely,
40

Page 306 ends

Ramon Ortiz
Director, Certification & Economic Development
41

Page 307 ends

March 28, 2024 Metro File #6371
MR. JOHN ALVARADO
G2 Construction, Inc.
1352 East Borchard Ave
Santa Ana, CA 92705-4413
Subject: Small Business Enterprise Certification
Dear MR. JOHN ALVARADO:

We are pleased to advise you that after careful review of your application and supporting documentation, the Los Angeles County Metropolitan Transportation Authority (Metro) has determined that your firm meets the eligibility standards to be certified as a Small Business Enterprise (SBE) as required under Metro's SBE Program. Your firm will be listed in Metro's SBE database of certified SBEs under the following specific areas of expertise:

NAICS 331491: NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM) ROLLING, DRAWING, AND EXTRUDING NAICS 237310: HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
NAICS 332313: PLATE WORK MANUFACTURING
Your SBE certification is valid for five years from the date of this letter and applies only for the above NAICS code(s). Any additions and revisions must be submitted to Metro for review and approval.

In order to ensure your continuing SBE status, you are required to submit an annual update along with supporting documentation. If no changes are noted, then your SBE status remains current. If there are changes, Metro will review to determine continued SBE eligibility. Please note, your SBE status remains in effect unless Metro notifies you otherwise.

After the five-year certification period, your entire file will be reviewed in order to ascertain continued SBE certification status. You will be notified of the pending SBE status review and any documentation updates necessary prior to the expiration date.

Also, should any changes occur that could affect your certification status prior to receipt of the annual update application, such as changes in your firm's name, business/mailing address, ownership, management or control, or failure to meet the applicable business size standards or personal net worth standard, please notify Metro immediately.

Metro reserves the right to withdraw this certification if at any time it is determined that it was knowingly obtained by false, misleading, or incorrect information. Your SBE certification is subject to review at any time. The firm thereby consents to the examination of its books, records, and documents by Metro.

Congratulations, and thank you for your interest in Metro's SBE Program. Should you have any questions, please contact us at (213) 922-2600. For information on Metro contracting opportunities, please visit our website at www.metro.net/connect.

Sincerely,
Ramon Ortiz
Director, Certification & Economic Development
42

Page 308 ends

OCLSB CERTIFICATE EXPIRATION DATE: 10/31/2026
CERTIFICATE ID: 2017839
LEGAL COMPANY NAME: G2 Construction Inc
DOING BUSINESS AS (DBA) NAME 1:

DOING BUSINESS AS (DBA) NAME 2: G2 CONSTRUCTION INC
COMPANY HEADQUARTERS ADDRESS: 1352 East Borchard Ave.

Santa Ana, CA 92705
COMPANY PHONE NUMBER: 714/748-4242
COMPANY EMAIL: [email protected]
COMPANY FAX NUMBER:

COMPANY WEB ADDRESS www.g2construction.com
SERVICE AREA Orange
CONGRATULATIONS – Print and Save your OCLSB Certificate! Your business is now certified and ready to compete in a County competitive solicitation process as an Orange County Local Small Business.

THE COMPANY LISTED ON THIS CERTIFICATE MEETS THE

COUNTY OF ORANGE CERTIFICATION REQUIREMENTS AS AN
OCLSB
Click here to get help
714-748-4244
G2 Construction, Inc.
43

Page 309 ends

COMMITTEE TRANSMITTAL
Orange County Transportation Authority
550 South Main Street / P.O. Box 14184 / Orange / California 92863-1584 / (714) 560-OCTA (6282) October 14, 2024
To: Members of the Board of Directors
From: Andrea West, Clerk of the Board
Subject: Comprehensive Transportation Funding Programs - Project X Tier 1 and Tier 2 2024 Calls for Projects Programming Recommendations Regional Transportation Planning Committee Meeting of October 7, 2024

Present: Directors Dumitru, Federico, Foley, Harper, Khan, and Stephens

Absent: None
Committee Vote
This item was passed by the Members present.

Committee Recommendation(s)
A. Approve the award of $3,712,423 in Tier 1 Environmental Cleanup Program funding for 11 projects.

B. Approve the award of $6,967,250 in Tier 2 Environmental Cleanup Program funding for four projects.

Page 310 ends

Orange County Transportation Authority
550 South Main Street / P.O. Box 14184 / Orange / California 92863-1584 / (714) 560-OCTA (6282) October 7, 2024
To: Regional Transportation Planning Committee
From: Darrell E. Johnson, Chief Executive Officer
Subject: Comprehensive Transportation Funding Programs – Project X Tier 1 and Tier 2 2024 Calls for Projects Programming
Recommendations
Overview
The Orange County Transportation Authority’s Environmental Cleanup Program provides Measure M2 funding for water quality improvement projects to address transportation-generated pollution. The 2024 Tier 1 and Tier 2 Grant Program calls for projects were issued on February 12, 2024. Evaluations for grant applications are now complete, and a list of projects is presented for Board of Directors’ review and approval.

Recommendations
A. Approve the award of $3,712,423 in Tier 1 Environmental Cleanup Program funding for 11 projects.

B. Approve the award of $6,967,250 in Tier 2 Environmental Cleanup Program funding for four projects.

Background
In May 2010, the Orange County Transportation Authority (OCTA) Board of Directors (Board) approved a two-tiered approach to fund the Measure M2 (M2) Project X Environmental Cleanup Program (ECP). The Tier 1 Grant Program is designed to mitigate the more visible forms of pollutants, such as litter and debris, which collect on roadways and in catch basins prior to being deposited in waterways and the ocean. The Tier 2 Grant Program provides funding for larger projects treating catchment areas of 50 acres or greater and allows for multi-jurisdictional, capital-intensive structural treatment best management practice (BMP) types of projects.

Page 311 ends

Comprehensive Transportation Funding Programs – Project X Tier 1 and Tier 2 2024 Calls for Projects Programming
Recommendations

Page 2 ends

Tier 1 funds are available for Orange County local jurisdictions to purchase and install equipment and other projects that implement BMPs and that supplement, not supplant, current water quality programs. Examples include screens, filters, and inserts for catch basins, as well as other devices designed to remove the above-mentioned pollutants. Tier 2 funds are designed to implement more comprehensive capital investments, which mitigate visible litter and debris, but also heavy metals, organic chemicals, sediment, nutrients, and other transportation-related pollutants. Examples of these large-scale BMPs include constructed wetlands, detention/infiltration basins, and vegetated swales.

Proposed projects must demonstrate a direct nexus to the reduction of transportation-related pollution, as developed and defined by OCTA’s Environmental Cleanup Allocation Committee (ECAC).

To date, the Board has approved funding for 222 Tier 1 projects, totaling over $36 million. Two previous Tier 2 calls took place in 2012 and 2013, which resulted in funding 22 projects in the amount of $28 million. On February 12, 2024, the Board approved issuance of the 2024 ECP Tier 1 and Tier 2 calls, with a funding target of $3.5 million to support a 14th call for the Tier 1 program, and approximately $15 million to support a third call for the Tier 2 program.

Discussion
Tier 1
The ECP Tier 1 call application deadline was April 25, 2024. As of that date, 13 applications were submitted from 13 local jurisdictions. However, the applications submitted from the cities of Buena Park and Orange cannot move forward due to the cities being found ineligible to receive M2 net revenues by the Board on May 28, 2024. The remaining 11 applications were reviewed and evaluated by an application review committee consisting of OCTA staff and two members of the ECAC. Project applications were evaluated based on Board-approved evaluation criteria, which included the following:
x Effectiveness at removing trash and debris;
x Cost/benefit analyses;
x Pollution-reducing benefits;
x Project readiness;
x Adequacy of proposed operations and maintenance plans; and x Submission of clear and detailed work plans with specific implementation timing documented.

Page 312 ends

Comprehensive Transportation Funding Programs – Project X Tier 1 and Tier 2 2024 Calls for Projects Programming
Recommendations

Page 3 ends

On September 12, 2024, the ECAC met and endorsed the application review committee’s recommendation that the 11 projects totaling $3,712,423 identified in Attachment A be advanced to the Board for consideration of funding. While the recommended award amount is higher than the Board-authorized target of $3.5 million, the recommended funding amount is within the Project X funding capacity in the Measure M2 Next 10 Plan and cash flow.

The recommended Tier 1 projects met overall program objectives and scored well in terms of satisfying the evaluation criteria listed above. The proposed improvements primarily consist of various catch basin debris screen devices including connector pipe screens (CPS), automatic retractable screens (ARS), full trash capture (FTC) units, grated inlet trash screens (GITS), as well as debris booms and a hydrodynamic separator (HDS).

More detailed project-specific information and visual samples of recommended project unit types are provided in Attachments B and C, respectively. A brief overview of these project types is also provided below. x Catch basin debris screen devices: These devices prevent debris from entering the storm drain system through catch basins and primarily consist of CPS, ARS, FTC, and GITS type devices.
x A debris boom is a floating barrier placed across a channel to capture floating trash and debris, which is collected and disposed of regularly and following storm events.
x An HDS utilizes a combination of swirl concentration and indirect screening to separate and capture trash and debris. The filtered water then passes into the separation area where suspended solids can settle, and runoff passes through. Trash and debris are captured and contained within the screen enclosure and vacuumed during maintenance.

As part of the Tier 1 program, local agencies agree to contribute a minimum cash match of 20 percent of total project costs. All recommended projects either meet or exceed this requirement.

Tier 2
The ECP Tier 2 call application deadline was May 16, 2024. Four applications were submitted from four local jurisdictions. Project applications were evaluated based on the Board-approved Tier 2 scoring criteria, which includes both technical and non-technical elements.

Page 313 ends

Comprehensive Transportation Funding Programs – Project X Tier 1 and Tier 2 2024 Calls for Projects Programming
Recommendations

Page 4 ends

Technical scoring was conducted with the OC Stormwater Tools Planning Module which utilized project parameters input by the applicant. Scores were derived based on the proposed projects’ nexus to transportation-related pollutants, water quality treatment needs, and the ability of the proposed project to address specific water quality issues. The application review committee reviewed each application and provided non-technical scores considering project readiness, regional benefits, and co-benefits beyond water quality improvement (i.e., recreation, habitat, drainage, etc.).

On September 12, 2024, the ECAC met and concurred with the application review committee’s conclusions and recommended that four Tier 2 projects, in the amount of $6,967,250, be recommended to the Board for funding consideration as shown in Attachment C. All projects demonstrated that they meet the intent of M2 to address transportation-related pollution by providing effective water quality treatment.

More detailed project information and visual samples of the recommended project types are provided in Attachments E and F, respectively. A brief overview of the Tier 2 projects recommended for funding is also provided below:
x Santa Ana Zoo Stormwater Capture and Diversion Project (City of Santa Ana) – construct two underground stormwater filtration systems, install a hydrodynamic separation device and vegetated swales. x Poche Beach Water Reclamation Project (City of San Clemente) – construct a low flow diversion system to address bacteria water quality. x State College Boulevard Stormwater Capture and Conveyance Project (City of Anaheim) – repurpose 10,000 linear feet of abandoned sewer pipe to install underground dry wells for stormwater runoff treatment, capture, and infiltration.
x Newport Dunes Water Quality Improvement Project (City of Newport Beach) – construct infiltration galleries to capture dry weather flow.

As part of the Tier 2 grant program, local agencies agree to contribute a minimum cash match of 50 percent of total project costs, with opportunities to reduce the match based on project readiness. All recommended projects meet or exceed the match requirement, and Anaheim was able to reduce its match to 40 percent by applying the match reduction benefit.

Page 314 ends

Comprehensive Transportation Funding Programs – Project X Tier 1 and Tier 2 2024 Calls for Projects Programming
Recommendations

Page 5 ends

Next Steps
Upon Board approval, each funded agency will be required to execute a letter amendment (to their existing M2 Master Funding Agreement) prior to project implementation. Once this process is complete, OCTA will initiate project monitoring and reporting through the Comprehensive Transportation Funding Programs semi-annual review and M2 quarterly reporting processes.

Summary
The OCTA ECP provides grant funding to local jurisdictions for projects that support water quality improvements related to transportation infrastructure. The 2024 Tier 1 and Tier 2 call has concluded. Staff is recommending Board approval to program $3,712,423 in ECP funds to 11 local jurisdiction Tier 1 projects, and $6,967,250 in ECP funds to four local jurisdiction Tier 2 projects.

Attachments
A. 2024 Project X Tier 1 Call for Projects – Programming Recommendations B. 2024 Project X Tier 1 Call for Projects – Project Summaries C. Visual Samples of Recommended Best Management Practice Project Types – Tier 1
D. 2024 Project X Tier 2 Call for Projects – Programming Recommendations E. 2024 Project X Tier 2 Call for Projects – Project Summaries F. Visual Samples of Recommended Best Management Practice Project Types – Tier 2
Prepared by: Approved by:

Charvalen Alacar Kia Mortazavi
Section Manager III, M2 Local Programs
(714) 560-5401
Executive Director, Planning
(714) 560-5741

Page 315 ends

ATTACHMENT A
No Agency Project Title Project Description * Local Match M2 Funding Cumulative 1 Anaheim Stormwater Catch Basin Screen Installation Project Phase 5 – FY 2024-2025 Install 485 CPS and 13 ARS units 20% $ 600,000 $ 600,000 2 County of Orange Orange County Debris Boom Project 2024 Install four debris booms 20% $ 288,000 $ 888,000 3 Fountain Valley Fountain Valley High Priority CPS Screen Installation Install 320 CPS units 20% $ 392,931 $ 1,280,931 4 Fullerton Installation of Full Capture Trash Devices in Catch Basins – 2024 Install 79 CPS and 16 GITS units 20% $ 188,352 $ 1,469,283 5 Huntington Beach Trash Provision Compliance Full Capture System (FCS) Installation Project Install 60 FTC units 20% $ 192,200 $ 1,661,483
6 Irvine Catch Basin Connector Pipe Screen Installation Project – Phase 4 Install 344 CPS units 20% $ 357,760 $ 2,019,243 7 Mission Viejo Trash and Runoff Abatement Project (TRAP): CPS-Mod™ & ARS-CL™ Installations in the Southwest Area Install 31 CPS and 101 ARS units 20% $ 160,000 $ 2,179,243 8 San Clemente El Camino Real Vicinity Runoff Corridor Project Install 47 CPS, 16 GITS, and 208 ARS units 20% $ 328,000 $ 2,507,243 9 Santa Ana 10th and Flower Stormwater Capture Project
Install one HDS, two catch basin filter inserts, three
bioretention basins, and two underground infiltration
systems
56% $ 600,000 $ 3,107,243
10 Seal Beach Galleon Way at Electric Avenue Stormwater Treatment Install one HDS and one ARS unit 20% $ 584,940 $ 3,692,183 11 Stanton Western Storm Channel Grate Replacement Project Install one custom inlet grate 20% $ 20,240 $ 3,712,423 * Final quantities of devices and units installed may vary slightly after construction is completed.

No Agency Project Title Project Description Local Match M2 Funding Request Cumulative
12 Buena Park Catch Basin Trash Device Project – Phase 6 Install 63 CPS, 39 GITS, and 52 ARS units 20% $ 356,000 $ 4,048,183 13 Orange, City of White Oak Ridge & Palmyra Avenue Water Quality Storm Drain Improvement Project Install one HDS and five CPS units 20% $ 597,240 $ 4,645,423 gThe cities of Buena Park and Orange submitted Project X Tier 1 applications that were not considered for funding. Local jurisdictions were deemed ineligible to receive M2 funds by the OCTA Board of Directors on May 28, 2024.

Acronyms
ARS - Automatic Retractable Screen
BMP - Best Management Practice
CPS - Connector Pipe Screen
FTC - Full Trash Capture Unit
FY - Fiscal Year
GITS - Grated Inlet Trash Screen
HDS - Hydrodynamic Separator
M2 - Measure M2
OCTA - Orange County Transportation Authority
Projects Recommended for Funding
Projects Not Recommended for Funding g
2024 Project X Tier 1 Call for Projects – Programming Recommendations

Page 316 ends

ATTACHMENT B
No Agency Project Title Project Highlights *
1 Anaheim Stormwater Catch Basin Screen Installation Project Phase 5 – FY 2024 - 2025 The City of Anaheim proposes installing 485 CPS and 13 ARS devices to improve the removal of pollutants entering the water system, including area creeks, groundwater, and eventually the ocean. The project area is located in the Carbon Creek, Westminster, and Santa Ana River Watersheds.
2 County of Orange Orange County Debris Boom Project 2024 The County of Orange proposes to install floating Debris Trash Booms at three locations in Orange County's San Gabriel River-Coyote Creek Watershed and one within the Newport Bay Watershed. This project will address trash, debris and, related pollutants stemming from litter blown from freeways, arterial highways, and roads.
3 Fountain Valley Fountain Valley High Priority CPS Screen Installation The City of Fountain Valley proposes to install 320 CPS units located in high-density residential and commercial areas of the city. These areas are the City’s most dense PLU areas with high concentrations of industrial, commercial, bus stops, and driving routes. 4 Fullerton Installation of Full Capture Trash Devices in Catch Basins – 2024 The City of Fullerton proposes to install 79 CPS and 16 GITS devices in priority area and non-priority catch basins. The City selected specific locations that are located in priority high traffic areas and non-priority areas, and do not have full capture or pollutant removal devices.The target locations also included centers with high pedestrian and vehicular traffic. 5 Huntington Beach Trash Provision Compliance Full Capture System (FCS) Installation Project The City of Huntington Beach proposes to implement the FCS Installation Project to comply with the State’s trash provisions by installing 60 FTC cevices throughout the City. The City is retrofitting pump stations with full capture systems since the centralized system is easier to maintain compared to multiple catch basin inserts.
6 Irvine Catch Basin Connector Pipe Screen Installation Project – Phase 4 The City of Irvine proposes to install 344 CPS units within existing catch basins at various locations in Planning Areas 4. The proposed CPS locations were selected considering several factors such as development areas, increased vehicle/pedestrian traffic, the absence of stormwater treatment by a natural treatment system, drainage from PLU areas, and drainage to downstream receiving waters listed in the Clean Water Act. 7 Mission Viejo Trash and Runoff Abatement Project (TRAP): CPS-Mod™ & ARS-CL™ Installations in the Southwest Area
The City of Mission Viejo proposes to install 31 CPS and 101 ARS in catch basins located citywide. These project locations target PLU areas and will reduce stormwater pollution by preventing trash and pollutants from busy arterial roadways. 8 San Clemente El Camino Real Vicinity Runoff Corridor Project The City of San Clemente proposes to install 47 CPS, 16 GITS, and 208 ARS units along a 4-mile section of El Camino Real in lower San Clemente. The project runs parallel to the Pacific Ocean and all 74 CBs are between 0.36 and 0.75 miles from the ocean. 9 Santa Ana 10th and Flower Stormwater Capture Project
The CIty of Santa Ana proposes to install one HDS, two Catch Basin Filter Inserts, three Bioretention Basins, and two Underground Infiltration Systems. The multi-benefit project features the installation of stormwater BMPs, designed to capture and infiltrate stormwater runoff from an 82- acre drainage area, including the proposed park and surrounding roadways, commercial, and residential land use areas. 10 Seal Beach Galleon Way at Electric Avenue Stormwater Treatment The City of Seal Beach proposes to upgrade stormwater management and enhance the drainage system capacity across a 16.24-acre area within a mixed urban neighborhood. The project will install one HDS and one ARS to efficiently redirect flow into the HDS with a bypass extension reconnecting to the Electric Avenue drainage system.
11 Stanton Western Storm Channel Grate Replacement Project The City of Stanton proposes the removal of existing inlet grates and the installation of one custom inlet grate. This improvement aims to achieve enhanced stormwater capture, debris reduction, and water quality improvements. * Final quantities of devices and units installed may vary slightly after construction is completed.

Acronyms
ARS - Automatic Retractable Screen
BMP - Best Management Practice
CPS - Connector Pipe Screen
FTC - Full Trash Capture Unit
FY - Fiscal Year
GITS - Grated Inlet Trash Screen
HDS - Hydrodynamic Separator
PLU - Priority Land Use
2024 Project X Tier 1 Call for Projects – Project Summaries

Page 317 ends

1 Visual Samples of Recommended Best Management Practice Project Types – Tier 1
Automatic Retractable Screen Connector Pipe Screen
Full Trash Capture Unit Grated Inlet Trash Screen

ATTACHMENT C

Page 318 ends

2 Visual Samples of Recommended Best Management Practices, Tier 1 Project Types
Hydrodynamic Separator Debris Boom
Underground Infiltration /
Infiltration Gallery Bioretention Basins

Page 319 ends

3 Visual Samples of Recommended Best Management Practice Project Types
Catch Basin Filter Insert
Note: Photographs are for visualization purposes. Actual devices installed may be different depending on final procurement, site characteristics, final specifications, etc.

Page 320 ends

ATTACHMENT D
No Agency Project Title Project Description Local Match * M2 Funding Cumulative 1 Anaheim State College Boulevard Stormwater Capture and Conveyance Project
Repurpose large diameter abandoned sewer pipe and install underground dry wells for stormwater runoff treatment, capture, and infiltration.
40% $ 1,500,000 $ 1,500,000
2 Newport Beach Newport Dunes Water Quality Improvement Project Install one 2,000 square foot infiltration gallery and five 200 square foot infiltration galleries. 50% $ 467,250 $ 1,967,250
3 San Clemente Poche Beach Water Reclamation Project Install a low-flow diversion system to address bacteria water quality issues. 75% $ 2,500,000 $ 4,467,250
4 Santa Ana Santa Ana Zoo Stormwater Capture and Diversion (SAZSCAD) Project
Install two underground infiltration units, one hydrodynamic separator, two vegetated swales, and pervious pavement 63% $ 2,500,000 $ 6,967,250 2024 Project X Tier 2 Call for Projects – Programming Recommendations Projects Recommended for Funding
* Minimum local match is 50% with opportunities to reduce the match based on project readiness.

Page 321 ends

ATTACHMENT E
No Agency Project Title
1 Anaheim State College Boulevard Stormwater Capture and Conveyance Project 2 Newport Beach Newport Dunes Water Quality Improvement Project 3 San Clemente Poche Beach Water Reclamation Project
4 Santa Ana Santa Ana Zoo Stormwater Capture and Diversion (SAZSCAD) Project 2024 Project X Tier 2 Call for Projects – Project Summaries Project Highlights
• Construct a large underground stormwater infiltration system in the primary parking lot of the Santa Ana Zoo. • Construct a smaller underground stormwater infiltration system in the overflow parking lot. • Install a hydrodymanic separation device for pretreatment. • Other features: diversion structure, flow meter system, two vegetated swales, and pervious pavement. • Designed to capture and infiltrate approximately 54 acre-feet per year of stormwater runoff from the 180-acre tributary drainage area.
• Install a low-flow diversion system to address bacteria water quality issues at Poche Beach. • Located at outfall point of the 4,436-acre Poche Beach subwatershed. • Operational year-round; will divert all dry weather runoff from Prima Deshecha and Cascadita storm drains. • Treatment via membrane-filtration reverse osmosis.
• Will reclaim 500 acre-feet per year for local water supply.

Project Summaries
• Redirect stormwater runoff from overburdened Orange County Flood Control District facility. • Repurpose approximately 10,000 linear feet of large diameter abandoned sewer pipe by installing underground dry wells for stormwater runoff treatment, capture, and infiltration. • Designed to capture, retain, and infiltrate approximately 63.2 acre-feet of water per year. • Construct a 2,000 square-foot infiltration gallery within the beach, east of the lagoon. • Construct five 200 square-foot infiltration galleries adjacent to exsiting catch basins. • Designed to capture all dry weather flow of up to 5,000 gallons per day. • Dry weather flows infiltrate underlying beach sand prior to flowing into the lagoon.

Page 322 ends