Cities Index.
Agenda

Fountain Valley City Council
April 7, 2026

Document
Agenda
Meeting
April 7, 2026
Body
Fountain Valley City Council
Pages
734
Original file
70.2 MB
Text extracted from the city's file for reading and search. Open the original on www.fountainvalley.gov. That file is the official record.

15.11 SF

15.12 SF

15.13 SF

15.14 SF

15.15 SF

15.16 SF

15.17 SF

15.18 SF

15.19 SF

15.20 SF

15.21 SF

15.22 SF
RESTORATION OF A MINERAL-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH TWO-COMPONENT,

LOW-ODOR URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Two-Component, Low-Oder Urethane 2.0 Gallons per Square / Reinforcement /

1.0 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply TwoComponent, Low-Oder Urethane as a Base Coat at a Rate of 2.0 Gallons per Square and a Top Coat at a Rate of 2.0 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A MINERAL-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLY-REINFORCED, TWOCOMPONENT, LOW-ODER URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1.5 Gallon per Square (3.5 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply TwoComponent, Low-Oder Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESATURATION OF SMOOTH-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared roof scan roof system and replace all wet insulation (USE SEPARATE LINE ITEMS); Prime the roof surface at rate of 1/2 - 3/4 Gallons per Square; Apply heavy-bodied, fiber reinforced asphalt roof coating and embed firm polyester reinforcement at a rate of 3.0 Gallons per Square / Polyester /3.5 Gallons per Square.

RESATURATION OF SMOOTH-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared roof scan roof system and replace all wet insulation (USE SEPARATE LINE ITEMS); Prime the roof surface at rate of 1/2 - 3/4 Gallons per Square; Apply heavy-bodied, fiber reinforced asphalt roof coating and embed soft polyester reinforcement at a rate of 1.2 Gallons per Square / Polyester /1.4 Gallons per Square.

RESATURATION OF MINERAL-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared roof scan roof system and replace all wet insulation (USE SEPARATE LINE ITEMS); Prime the roof surface at rate of 1/2 - 3/4 Gallons per Square; Apply heavy-bodied, fiber reinforced asphalt roof coating and embed firm polyester reinforcement at a rate of 3.5 Gallons per Square / Polyester / 3.5 Gallons per Square.

RESTORATION OF A SINGLE-PLY ROOF OR SMOOTH-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLYREINFORCED, SINGLE-COMPONENT URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3.0 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply SingleComponent, Aliphatic Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A MINERAL-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH SINGLE-COMPONENT

URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply SingleComponent, Aliphatic Urethane as a Base Coat at a Rate of 2.0 Gallons per Square and Top Coat at a Rate of 2.0 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A MINERAL-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLY-REINFORCED, SINGLECOMPONENT URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1.5 Gallon per Square (3.5 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply SingleComponent, Aliphatic Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A SINGLE-PLY WITH TWO-COMPONENT, LOW-ODER URETHANE & STRIPPED SEAMS Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Strip in Seams by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Two-Component, Low-Oder Urethane as a Base Coat at a Rate of 1.5 Gallons per Square and a Top Coat at a Rate of 1.0 Gallon per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF SMOOTH-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH TWO-COMPONENT,

LOW-ODER URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply TwoComponent, Low-Oder Urethane as a Base Coat at a Rate of 2 Gallons per Square and a Top Coat at a Rate of 1.5 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A SINGLE-PLY ROOF OR SMOOTH-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLYREINFORCED, TWO-COMPONENT, LOW-ODER URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply TwoComponent, Low-Oder Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF SMOOTH-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH SINGLE-COMPONENT

URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply SingleComponent, Aliphatic Urethane as a Base Coat at a Rate of 2 Gallons per Square and a Top Coat of 1.5 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

Page 592 ends

15.23 SF

15.24 SF

15.25 SF

15.26 SF

15.27 SF

15.28 SF

15.29 SF

15.30 LF

15.31 LF

15.32 LF

15.33 LF

16.00 INSTALLATION OF SHAKE, TILE, OR SHINGLE ROOF SYSTEMS

16.01 SF

16.02 SF

16.03 SF

16.04 SF

16.05 SF

16.06 SF

16.07 SF

17.00 FULLY ADHERED SINGLE-PLY ROOF SYSTEMS

17.01 METAL DECK - SINGLE-PLY APPLICATION

17.01.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Adhere 1/2" Treated Gypsum Insulation
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal) with Insulation
Adhesive to Provide an Average R-Value
of 20 SF

17.02 WOOD/TECTUM DECK - SINGLE-PLY APPLICATION

INSTALL NEW DIMENSIONAL SHINGLE ROOF SYSTEM -
New Dimensional Shingle Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

INSTALL NEW CEDAR SHAKE ROOF SYSTEM -
New Cedar Shake Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

INSTALL NEW BARREL CLAY/CEMENT TILE ROOF SYSTEM -
New Barrel Clay/Cement Tile Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

INSTALL SLATE TILE ROOF SYSTEM -
New Slate Tile Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

ADD/DEDIUCT TO INSTALL SELF-ADHERING UNDERLAYMENT OVER ENTIRE ROOF - Install Self-Adhering Underlayment on Entire Roof Deck

REINFORCING SEAMS WITH SINGLE-COMPONENT URETHANE
Reinforce Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallons per Square (3 Gallons per Square on Seams)

REINFORCING SEAMS WITH TWO-COMPONENT, LOW-ODER URETHANE Reinforce Seams by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1 Gallons per Square (3 Gallons per Square on Seams)

STRIPPING IN SEAMS WITH SINGLE-COMPONENT URETHANE
Strip in Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square

STRIPPING IN SEAMS WITH TWO-COMPONENT, LOW-ODER URETHANE Strip in Seams by Applying a Two-Component, Low Odor Urethane 2 Gallons per Square

INSTALL NEW THREE-TAB SHINGLE ROOF SYSTEM -
New Three-Tab Shingles with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

REPLACING ARCHITECTURAL SHINGLE ROOF SYSTEM -
New Dimensional Shingle Roof System with Base Sheet as an Underlayment, Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

COAT EXISTING ROOF SURFACE WITH FIBRATED ALUMINUM ROOF COATING Prepare Roof Surface by Sweeping Off All Dirt, Dust and Debris; If Existing Roof Surface is Weathered, Prime the Roof Surface at a Rate of 1 Gallon per Square; If Repairs to Any Cracks, Splits or Surface Irregularities Exist, Repair with a 3 Course Application of Mastic / Mesh / Mastic (USE SEPARATE LINE ITEM); Apply Fibrated Aluminum Roof Coating at a Rate of 2 Gallons per Square.

RESTORATION OF SMOOTH-SURFACED OR MINERAL-SURFACED ASPHALT-BASED ROOF WITH FULLYREINFORCED GLASS FIBERED ASPHALT EMULSION Prepare Roof Surface to be Clean & Free of Dust; Repair All Splits Tears of Blisters with a Three Course Application of Mastic / Mesh / Mastic (USE SEPARATE LINE ITEM); Prime the Roof Surface at a Rate of 1/2 Gallon per Square.

Embed Polyester into the Asphalt Emulsion in a 2 Coat Application at a Rate of 3 Gallons per Square / Polyester / 3 Gallons per Square

RESTORATION OF SMOOTH-SURFACED OR MINERAL-SURFACED ASPHALT-BASED ROOF WITH GLASS

FIBERED ASPHALT EMULSION
Prepare Roof Surface to be Clean & Free of Dust; Repair All Splits Tears of Blisters with a Three Course Application of Mastic / Mesh / Mastic (USE SEPARATE LINE ITEM); Prime the Roof Surface at a Rate of 1/2 Gallon per Square. Apply Asphalt Emulsion in a 2 Coat Application at a Rate of 2.5 Gallons per Square per Coat.

RESTORATION OF SINGLE-PLY, SMOOTH-SURFACED OR MINERAL-SURFACED ASPHALT-BASED ROOF WITH

SILICONE COATING
Prepare Roof Surface to be Clean & Free of Dust; Apply Silicone Coating System in a Single Coat Application at a Rate of

2.5 Gallons per Square

RESTORATION OF GRAVEL-SURFACED ASPHALT-BASED ROOF WITH SILICONE COATING Wet Vac or Spud Any Loose Gravel Off of Roof Surface & Dispose; Sweep Roof Surface to be Clean and Free of Dust; Apply Primer as a Bleed-Blocker at a Rate of 1/2 Gallon per Square; Apply Self-Leveling Silicone at a Rate of 6 Gallons per Square; Apply Silicone Coating System in a Single Coat Application at a Rate of 2.5 Gallons per Square.

ELASTOMERIC ASPHALT-BASED LIQUID APPLIED MEMBRANE SYSTEM FOR SMOOTH OR MINERAL

SURFACED ROOFS
Clean and Prime then Install Base Coat / Top Coat as Specified with Reinforced Seams - Restoration Coating Fully Reinforced System w/ Reflective Top Coat (3 Gallons per Sq. of Restoration Coating - Reinforcement - Additional 3 Gallons per Sq. of Restoration Coating; Allow 30 Day Cure and Install Reflective Coating at 1 Gallon per Sq. (New Flashings also Required Refer to Flashing Line Item)

RESATURATION OF MINERAL-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared Roof Scan Roof System And Replace All Wet Insulation (Use Separate Line Items); Prime The Roof Surface At Rate Of 1/2 - 3/4 Gallons Per Square; Apply Heavy-Bodied, Fiber Reinforced Asphalt Roof Coating And Embed Soft Polyester Reinforcement At A Rate Of 1.4 Gallons Per Square / Polyester /1.4 Gallons Per Square.

Page 593 ends

17.02.01 INSULATION OPTION:

WOOD DECK: Mechanically Fasten
Polyisocyanurate /
Adhere Treated 1/2" Gypsum Insulation
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal) with Insulation
Adhesive to Provide an Average R-Value
of 20 SF

17.02.02 INSULATION OPTION:

TECTUM DECK: Mechanically Attach
Base Sheet & Adhere Polyisocyanurate
in Insulation Adhesive / Adhere 1/2"
Treated Gypsum Insulation Board with
Glass-Mat (e.g. DensDeck / Securock /
Equal) in Insulation Adhesive to Provide
an Average R-Value of 20 SF

17.02.03 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

17.03 LIGHTWEIGHT CONCRETE/GYPSUM DECK - SINGLE-PLY APPLICATION

17.03.01 INSULATION OPTION:

Adhere Polyisocyanurate in Insulation
Adhesive / Adhere 1/2" Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) in
Insulation Adhesive to Provide an
Average R-Value of 20 SF

17.03.02 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

17.04 CONCRETE DECK - SINGLE-PLY APPLICATION

17.04.01 INSULATION OPTION:

Adhere Polyisocyanurate in Insulation
Adhesive / Adhere 1/2" Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) in
Insulation Adhesive to Provide an
Average R-Value of 20 SF

17.04.02 INSULATION OPTION:

Minimal Insulation - Must Adhere 1/2"
Treated Gypsum Insulation Board with
Glass-Mat (e.g. DensDeck / Securock /
Equal) in Insulation Adhesive to Provide
an Average R-Value of 20 SF

17.05 17.05.01 SINGLE-PLY ROOF TYPE:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 45 Mil
Thickness SF

17.05.02 SINGLE-PLY ROOF TYPE:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 60 Mil
Thickness SF

17.05.03 SINGLE-PLY ROOF TYPE:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 90 Mil
Thickness SF

17.05.04 SINGLE-PLY ROOF TYPE:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 45 Mil Thickness SF

17.05.05 SINGLE-PLY ROOF TYPE:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 60 Mil Thickness SF

17.05.06 SINGLE-PLY ROOF TYPE:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 90 Mil Thickness SF

17.05.07 SINGLE-PLY ROOF TYPE:

ASTM D 4434 - Poly Vinyl Chloride
(PVC) - 45 Mil Thickness SF

17.05.08 SINGLE-PLY ROOF TYPE:

ASTM D 4434 - Poly Vinyl Chloride
(PVC) - 60 Mil Thickness SF

17.05.09 SINGLE-PLY ROOF TYPE:

ASTM D 4434 - Poly Vinyl Chloride
(PVC) - 90 Mil Thickness SF

17.05.10 SINGLE-PLY ROOF TYPE:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 45 Mil Thickness SF

17.05.11 SINGLE-PLY ROOF TYPE:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 60 Mil Thickness SF

17.05.12 SINGLE-PLY ROOF TYPE:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 80 Mil Thickness SF

17.05.13 INSTALLATION OPTION:

Add / Deduct for Mechanically Attaching
Single-Ply Roof System Vs. Fully
Adhering SF

17.05.15 WARRANTY CHARGES:

Cost to Provide 15 Year - Material
Warranty Limited to the Dollar Amount of
the Material Original Purchase as a
Standard Warranty for All Applications in
this Section 17.05
Must includes coverage for roof uplift
pressures up to 90 MPH SF

17.05.16 WARRANTY UPCHARGE:

Add to provide coverage for a 15 Year
Labor & Material Warranty with No Dollar
Limitations SF
ROOF CONFIGURATION:

Fully Adhered Single-Ply Roof System Installed Over Prepared Surface or Insulation

Page 594 ends

17.05.17 WARRANTY UPCHARGE:

Add to provide coverage for a 20 Year
Labor & Material Warranty with No Dollar
Limitations SF

17.05.18 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

18.00 FLUID APPLIED WATERPROOFING MEMBRANE SYSTEMS WITH

POLYURETHANE RESIN COATINGS

18.01 18.01.01 FLUID APPLIED MEMBRANE SYSTEM: Two Coat System SF

18.01.02 FLUID APPLIED MEMBRANE SYSTEM: Three Coat System SF

18.01.03 FLUID APPLIED MEMBRANE SYSTEM: Three Coat Reinforced System SF

18.01.04 FLUID APPLIED MEMBRANE SYSTEM: Four Coat Reinforced System SF

18.01.05 WARRANTY CHARGES:
5 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.01 SF

18.01.06 WARRANTY CHARGES:
10 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.01 SF

18.02 POLYURETHANE COATINGS DIRECT TO WOOD SUBSTRATE

18.02.01 FLUID APPLIED MEMBRANE SYSTEM: Two Coat System SF

18.02.02 FLUID APPLIED MEMBRANE SYSTEM: Three Coat System SF

18.02.03 FLUID APPLIED MEMBRANE SYSTEM: Three Coat Reinforced System SF

18.02.04 FLUID APPLIED MEMBRANE SYSTEM: Four Coat Reinforced System SF

18.02.05 WARRANTY CHARGES:
5 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.02 SF

18.02.06 WARRANTY CHARGES:
10 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.02 SF

18.03 18.03.01 SF

18.03.02 SF

18.03.03 SF

18.03.04 SF

18.03.05 SF

18.03.06 SF

18.03.07 SF

18.03.08 SF

18.03.09 SF

18.03.10 SF

18.03.11 SF

18.03.12 SF

18.03.13 SF

18.03.14 SF

18.03.15 SF

18.04 18.04.01 LF

STRUCTURAL EXPANSION JOINT
Installation or replacement of an expansion joint that is necessary for structural integrity

MILLING
Mill an existing coating 1/8 inch to 1/4 inch

PRESSURE WASHING - HORIZONTAL
Pressure washing horizontal surfaces with 2000 PSI or greater

PRESSURE WASHING - VERTICAL
Pressure washing horizontal surfaces with 2000 PSI or greater

SAND BLASTING
Sand blast an existing coating

SHOT BLASTING
Shot blast an existing coating

FLUID APPLIED WATERPROOFING MEMBRANE SYSTEM BASE ON POLYURETHANE RESINS - ANCILARY

REPAIRS & SURFACE PREPARATION

CONCRETE REPAIRS TO VERTICAL SURFACES - FULL DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement CONCRETE REPAIRS TO HORIZONTAL SURFACES: 2"-4" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO HORIZONTAL SURFACES - 4"-6" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement

CONCRETE REPAIRS TO HORIZONTAL SURFACES - FULL DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement

GRINDING
Grind an existing coating

HANDHELD GRINDING
Grind an existing coating in areas that only can be done by hand

POLYURETHANE COATINGS DIRECT TO PRIMED CONCRETE SUBSTRATE (INCLUDE PRIMER FOR

CONCRETE SUBSTRATE)

FLUID APPLIED WATERPROOFING MEMBRANE SYSTEM BASE ON POLYURETHANE RESINS - CONCRETE

SURFACE REPAIRS & PREPARATION
CONCRETE REPAIRS TO OVERHEAD SURFACES: 2"-4" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO OVERHEAD SURFACES: FULL DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO VERTICAL SURFACES: 3"-5" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO VERTICAL SURFACES - 5"-8" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement

Page 595 ends

18.04.02 LF

18.04.03 LF

18.04.04 LF

18.04.05 LF

18.04.06 SF

18.05 18.05.01 LF

18.05.02 LF

19.00 WALL COATINGS FOR COATING WALL SYSTEMS

19.01 SF

19.02 SF

19.03 SF

19.04 SF

20.00 NEW FLASHINGS FOR ROOFING SYSTEMS & RESTORATION OPTIONS

20.01 20.01.01 FLASHING OPTION:

Separate Base & Top Ply: BASE PLY:

SBS Modified Fiberglass Reinforced
Base Flashing Ply w/ Tensile Strength of
100 lbf/in tensile (ASTM D 5147); TOP
PLY: ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type II - 80 lbf/in tensile SF

20.01.02 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type III - 220
lbf/in tensile SF

20.01.03 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 310
lbf/in tensile SF

20.01.04 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 500
lbf/in tensile SF

20.01.05 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 600
lbf/in tensile SF

20.01.01 FLASHING OPTION:

Separate Base & Top Ply: BASE PLY:

SBS Modified Fiberglass Reinforced
Base Flashing Ply w/ Tensile Strength of
200 lbf/in tensile (ASTM D 5147); TOP
PLY: ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type II - 80 lbf/in tensile SF

20.01.02 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type III - 220
lbf/in tensile SF

ELASTOMERIC COATING FOR CONCRETE TILT WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified ROOF FLASHINGS FOR MODIFIED & COAL TAR PITCH ROOF SYSTEMS:

Minimum 1 Ply of Base Flashing and Mineral Cap Sheet Installed in Hot ASTM D 312 Type III or IV Asphalt

FLUID APPLIED WATERPROOFING MEMBRANE SYSTEM BASE ON POLYURETHANE RESINS - ADDITIONAL

OPTIONS FOR APPLICATION & SURFACING

INSTALL REINFORCEMENT IN COATING SYSTEM
Installation of reinforcement adjustment of coverage rates to accommodate reinforcement

BROADCAST GRANULES TO PROVIDE SKID RESISTANCE
Broadcast aggregate or granules to provide skid resistance in top coat

ELASTOMERIC COATING FOR STUCCO WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified

ELASTOMERIC COATING FOR EFIS WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified

ELASTOMERIC COATING FOR CMU WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified

CAULKING JOINTS
Installation of caulking in joints. See caulking chart

ROUTING AND REMOVAL OF EXISTING CAULK
Rout and remove of existing caulk out of expansion joints

EPOXY INJECTION FOR CRACK REPAIR
Route cracks, drill holes every 18" inches, and inject and seal with epoxy

TAPE WOOD DECK JOINTS - INSTALLATION OF TAPE ON DECK JOINTS

WOOD SUBSTRATE REPLACEMENT - REMOVAL AND REPLACEMENT

Page 596 ends

20.01.03 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 310
lbf/in tensile SF

20.01.04 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 500
lbf/in tensile SF

20.01.05 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 600
lbf/in tensile SF

20.01.06 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type II - 80
lbf/in tensile SF

20.01.07 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type III - 220
lbf/in tensile SF

20.01.08 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 310
lbf/in tensile SF

20.01.09 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 500
lbf/in tensile SF

20.01.10 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 600
lbf/in tensile SF

20.01.11 SF

20.01.12 SF

20.02 Torch Applied Flashings -
Minimum 1 Ply of Torch Base and Torch Mineral Cap Sheet; Torch Applied

20.02.01 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Torch Applied Flashing Ply - 80 lbf/inch
tensile (ASTM D 5147); TOP PLY:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - 300 lbf/in Tensile
Torch Applied Membrane SF

20.03 20.03.01 FLASHING OPTION:

BASE PLY: SBS Polyester OR
Fiberglass/Polyester OR Fiberglass
Reinforced Self-Adhering Flashing Ply -
50 lbf/ tensile (ASTM D 5147); TOP PLY:

ASTM D 6161 (Polyester) OR 6162
(Fiberglass/Polyester) OR 6163
(Fiberglass) Self-Adhering Reinforced
Modified Bituminous Membrane Type III -
130 lbf/in tensile SF

PER SQUARE FOOT COSTS - INSTALLING IN COLD PROCESS FLASHING ADHESIVE Substitute Hot Asphalt Application for Cold Process Flashing Adhesive Application

PER SQUARE FOOT COSTS - INSTALLING IN COLD PROCESS FLASHING ADHESIVE Substitute Hot Asphalt Application for No VOCs, 100% Solids Cold Process Flashing Adhesive Application Self-Adhering Flashings -
Minimum 1 Ply of Self-Adhering Base and Self-Adhering Mineral Cap Sheet; Self-Adhering

Page 597 ends

20.04 20.04.01 ROOF MEMBRANE OPTION:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 45 Mil
Thickness SF

20.04.02 ROOF MEMBRANE OPTION:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 60 Mil
Thickness SF

20.04.03 ROOF MEMBRANE OPTION:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 90 Mil
Thickness SF

20.04.04 ROOF MEMBRANE OPTION:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 45 Mil Thickness SF

20.04.05 ROOF MEMBRANE OPTION:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 60 Mil Thickness SF

20.04.06 ROOF MEMBRANE OPTION:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 90 Mil Thickness SF

20.04.07 ROOF MEMBRANE OPTION:

ASTM D 4434 - Poly Vinyl Chloride
(PVC) - 45 Mil Thickness SF

20.04.08 ROOF MEMBRANE OPTION:

ASTM D 4434 - Poly Vinyl Chloride
(PVC) - 60 Mil Thickness SF

20.04.09 ROOF MEMBRANE OPTION:

ASTM D 4434 - Poly Vinyl Chloride
(PVC) - 90 Mil Thickness SF

20.04.10 ROOF MEMBRANE OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 45 Mil Thickness SF

20.04.11 ROOF MEMBRANE OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 60 Mil Thickness SF

20.04.12 ROOF MEMBRANE OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 80 Mil Thickness SF

21.00 METAL WALL PANEL SYSTEMS

21.01 WALL SYSTEM
Exposed Fastener Wall Panel System

21.01.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum, 36" Wide Panels SF

21.01.02 THICKNESS OPTION:

Add for Bare Aluminum 0.040"
Aluminum, 36" Wide Panels SF

21.01.03 PANEL WIDTH OPTION: Add for 32" Panel Width - Aluminum SF

21.01.04 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga, 36" Wide Panels SF

21.01.05 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga, 36" Wide Panels SF

21.01.06 PANEL WIDTH OPTION:

Add for 32" Panel Width - Galvalume
Coated Steel or Equal SF

21.01.07 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

21.01.08 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

21.01.09 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

21.01.10 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga, 36" Wide Panels SF

21.01.11 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga, 36" Wide Panels SF

21.01.12 PANEL WIDTH OPTION: Add for 32" Panel Width - Stainless Steel SF

21.01.13 THICKNESS OPTION:

Copper
Panel Price - 16 Oz., 36" Wide Panels SF

21.01.14 THICKNESS OPTION:

Copper
Panel Price - 20 Oz., 36" Wide Panels SF

21.01.15 PANEL WIDTH OPTION: Add for 32" Panel Width - Copper SF

21.01.16 THICKNESS OPTION:

Zinc
Panel Price - 0.032", 36" Wide Panels SF

21.01.17 THICKNESS OPTION:

Zinc
Panel Price - 0.040", 36" Wide Panels SF

21.01.18 PANEL WIDTH OPTION: Add for 32" Panel Width - Zinc SF

21.01.19 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; 3/4" of Expanded Polystyrene
(Minimum 1.5 lbs./cft) Installed Between
Girts SF

21.01.20 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Fastened
Polyisocyanurate with an Average RValue of 19 Installed Between Girts SF

21.01.21 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Attach Batten
Fiberglass Insulation with an Average RValue of 19 Installed Between Girts SF Single-Ply Flashings -
Fully Adhered Single-Ply Roof Flashings Installed on Corresponding Single-Ply Roof Systems

Page 598 ends

21.01.22 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Steel Stud Wall - Exterior Gypsum
Sheeting 1/2" to 5/8" Thickness, Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.01.23 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Existing Wall Construction - Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.01.24 PANEL INSTALLATION & INSULATION OPTION: Over Plywood; No Insulation SF

21.02 WALL SYSTEM
Concealed Fastener Wall Panel System - 12" Wide Panels

21.02.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum Thickness SF

21.02.02 THICKNESS OPTION:

Add for Bare Aluminum, 0.040"
Aluminum SF

21.02.03 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga SF

21.02.04 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga SF

21.02.05 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

21.02.06 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

21.02.07 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

21.02.08 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga Thickness SF

21.02.09 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga Thickness SF

21.02.10 THICKNESS OPTION:

Copper
Panel Price - 16 Oz Thickness SF

21.02.11 THICKNESS OPTION:

Copper
Panel Price - 20 Oz Thickness SF

21.02.12 THICKNESS OPTION:

Zinc
Panel Price - 0.032" Thickness SF

21.02.13 THICKNESS OPTION:

Zinc
Panel Price - 0.040" Thickness SF

21.02.14 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; 3/4" of Expanded Polystyrene
(Minimum 1.5 lbs./cft) Installed Between
Girts SF

21.02.15 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Fastened
Polyisocyanurate with an Average RValue of 19 Installed Between Girts SF

21.02.16 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Attach Batten
Fiberglass Insulation with an Average RValue of 19 Installed Between Girts SF

21.02.17 PANEL INSTALLATION & INSULATION OPTION: Over Plywood; No Insulation SF

21.02.18 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Steel Stud Wall - Exterior Gypsum
Sheeting 1/2" to 5/8" Thickness, Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.02.19 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Existing Wall Construction - Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.02.20 PANEL TYPE OPTION:

Add for Factory Insulated Concealed
Fastener Wall Panel SF

21.03 21.03.01 Non-Permeable Option: Fluid Applied System - ASTM 2178 SF

21.03.02 Non-Permeable Option:

Fluid Applied Water Based System -
ASTM 2178 SF

AIR BARRIER FOR WALL APPLICATIONS (BRICK, CMU, MASONARY WALLS OR STUD WALL WITH EXTERIOR

GYPSUM SHEETING)

Page 599 ends

21.03.03 Non-Permeable Option: Membrane System - ASTM E 2178 SF

21.03.04 Permeable Option:

Fluid Applied System - ASTM E 2178 &
ASTM E 96 SF

21.03.05 Permeable Option:

Fluid Applied Water Based System -
ASTM 2178 & ASTM E 96 SF

21.03.06 Permeable Option:

Membrane System - ASTM 2178 &
ASTM E 96 SF

21.04 21.04.01 Insulation Option: 1" Rock Wool Insulation Installed SF

21.04.02 Insulation Option: 2" Rock Wool Insulation Installed SF

21.04.03 Insulation Option: 3" Rock Wool Insulation Installed SF

21.04.04 Insulation Option: 4" Rock Wool Insulation Installed SF

21.04.05 Insulation Option:
1" Extruded Polystyrene Insulation
Installed SF

21.04.06 Insulation Option:
2" Extruded Polystyrene Insulation
Installed SF

21.04.07 Insulation Option:
3" Extruded Polystyrene Insulation
Installed SF

21.04.08 Insulation Option:
4" Extruded Polystyrene Insulation
Installed SF

22.00 22.01 %

22.02 %

22.03 %

22.04 %

22.05 %

22.06 %

22.07 %

22.08 %

22.09 %

22.10 %
MULTIPLIER - ROOF HEIGHT IS GREATER THAN 100 FT
Multiplier is applied when labor production is effected by the roof height. This multiplier applies to roof heights that exceed an estimated 10 stories. Additional roof height can require increased safety requirements, larger crane equipment, tie-offs, etc.

MULTIPLIER - ACCELERATED SCHEDULE
Multiplier is applied when increased labor burdens are required due to an accelerated work schedule. Situations include, but are not limited to requiring multiple concurrent trade crews beyond what is normally expected for project size, work to be performed on two (back-to-back) shifts, work requires larger than standard crew sizes, etc.

MULTIPLIER - NIGHT, WEEKEND OR HOLIDAY WORKING HOURS
Multiplier is applied when increased labor burdens are required due to working hours being limited to nights (equivalent of 3rd shift), weekends or holidays.

MULTIPLIER - ROOF OR WALLS HAVE LARGE AMOUNT OF PENETRATIONS / ROOF TOP OBSTRUCTIONS Multiplier is applied when labor production is effected a large number of roof penetrations, a limited amount of open roof areas or low overhead clearance requiring more hand work. Situations include, but are not limited to rooftop penetrations like: soil stacks, sky lights, roof drains, exhaust vents, HVAC equipment, etc. or rooftop obstructions such as: pipes, duct work, electrical wires, hoses or raised equipment, etc.

MULTIPLIER - CLEARENCE RESTRICTIONS REQUIRE WORKING FROM KNEE-LEVEL OR BELOW (APPLIES TO

ONLY THE EFFECTED ROOF AREA)
Multiplier is applied when labor production is effected by height restrictions. Situations that can cause low overhead clearance requiring more hand work include, but are not limited to rooftop equipment.

MULTIPLIER - ROOF HEIGHT IS GREATER THAN 20 FT, BUT LESS THAN OR EQUAL TO 50 FT STORIES Multiplier is applied when labor production is effected by the roof height. This multiplier applies to roof heights that exceed an estimated 2 stories, but are less than or equal to an estimated 5 stories. Additional roof height can require increased safety requirements, larger lift equipment, tie-offs, etc.

MULTIPLIER - ROOF HEIGHT IS GREATER THAN 50 FT, BUT LESS THAN OR EQUAL TO 100 FT Multiplier is applied when labor production is effected by the roof height. This multiplier applies to roof heights that exceed an estimated 5 stories, but are less than or equal to an estimated 10 stories. Additional roof height can require increased safety requirements, larger crane equipment, tie-offs, etc.

INSULATION FOR WALL APPLICATIONS (INSTALLED OVER AIR BARRIERS)

JOB SITE SPECIFIC MULTIPLIERS
The multipliers are applied to all line items in total (unless the contrary is specifically identified in the description) for the project because the conditions they address effect overall labor production, construction complexity and/or equipment requirements. Multiple Job Site Specific Multipliers can be used on a single project, but they are not meant to compound on each other.

For Reference: Attachment B Pricing in this IFB is for material, equipment, tools, labor and supervision necessary to install the line item. It is based upon a 200 - 300 square roofing project that is being performed on a box- or rectangular-shaped building. It is also assumed that the project will have only one roof level that is not more than 20 ft high from the ground. The roof is anticipated to have clear access point and minimal penetrations/obstructions. It is also based upon a 200 - 300 square masonry, wall panel or waterproofing project. The exterior sides of the building are assumed to be box- or rectangular- shaped with minimal doors, windows, penetrations or obstructions. It is anticipated that the sides of the building will have clear tie-off points and easy to access while work is being performed.

MULTIPLIER - DIFFICULT ROOF OR BUILDING ACCESS
Multiplier is applied when labor production is effected by roof or building access. Situations that can cause roof access to be more difficult include, but are not limited to: no access for lifts or cranes, access is dependent upon road closure, access point requires the closure of a building entrance, roof level is not accessible from the ground, roof area is interior to adjacent roofs or roof materials and materials and equipment must be loaded to one roof area and carried to another roof area, roof materials and equipment must be carried to the roof through an interior building access point, no or limited staging areas on the ground, etc.

MULTIPLIER - SECURE ACCESS IS REQUIRED TO WORK ON ROOF OR WALLS Multiplier is applied when labor production is effected daily by the lost time in getting through security or getting access to the job site. Situations include, but are not limited to clearing each employee and all tools through metal detectors, passing through security gates with vehicles, tradespeople and equipment, stringent background checks or higher clearance levels, etc.

MULTIPLIER - MULTIPLE MATERIAL STAGINGS
Multiplier is applied when labor production is effected by the time it takes to stage a roof multiple times. Situations include, but are not limited to staging materials to perform work on multiple roof levels, planned shutdowns and restarts, portion of the job is over sensitive work areas requiring staging from more than one point, etc.

Page 600 ends

22.11 22.12 %

22.13 %

22.14 %

22.15 %

22.16 %

22.17 %

22.18 %

22.19 %

22.20 %

22.21 %

22.22 %

22.23 %

22.24 %

22.25 %
MULTIPLIER - ROOF SIZE IS GREATER THAN 30,000 SF, BUT LESS THAN 50,000 SF Multiplier is applied when Roof Size is greater than 30,000 SF, but less than 50,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a larger than average roof area resulting in fixed costs being a lower portion of the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 50,000 SF, BUT LESS THAN 100,000 SF Multiplier is applied when Roof Size is greater than 50,000 SF, but less than 100,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a large roof area resulting in fixed costs being a small impact on the overall job costs
MULTIPLIER - ROOF SIZE IS GREATER THAN 100,000 SF, BUT LESS THAN 200,000 SF Multiplier is applied when Roof Size is greater than 100,000 SF, but less than 200,000 SF. Situation creates the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across larger roof area resulting in fixed costs being a slight impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 200,000 SF
Multiplier is applied when Roof Size is greater than 200,000 SF. Situation creates the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across very large roof area resulting in fixed costs being a minimal impact on the overall job costs
MULTIPLIER - ROOF SIZE IS GREATER THAN 500 SF, BUT LESS THAN 1,000 SF Multiplier is applied when Roof Size is greater than 500 SF, but less than 1,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 1,000 SF, BUT LESS THAN 2,000 SF Multiplier is applied when Roof Size is greater than 1,000 SF, but less than 2,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 2,000 SF, BUT LESS THAN 3,000 SF Multiplier is applied when Roof Size is greater than 2,000 SF, but less than 3,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 3,000 SF, BUT LESS THAN 5,000 SF Multiplier is applied when Roof Size is greater than 3,000 SF, but less than 5,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a smaller roof area resulting in fixed costs being a larger portion of the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 5,000 SF, BUT LESS THAN 10,000 SF Multiplier is applied when Roof Size is greater than 5,000 SF, but less than 10,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a smaller roof area resulting in fixed costs being a larger portion of the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 10,000 SF, BUT LESS THAN 20,000 SF Multiplier is applied when Roof Size is greater than 10,000 SF, but less than 20,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across more of an average roof area resulting in fixed costs being a slightly larger portion of the overall job costs

MULTIPLIER - WALL COATING, MASONRY REPAIRS OR WATERPROOFING REQUIRES A SWING STAGE Multiplier is applied when labor production is effected by the requirement to use a swing stage. This multiplier applies to wall coatings, masonry repairs or waterproofing work that requires the use of a swing stage.

MULTIPLIER - ROOF IS CONSIDERED NON-STANDARD ARCHITECTURE Multiplier is applied when labor production is effected because the roof area is not a box- or rectangular-shaped.

Situations considered to be non-standard architecture can include, but are not limited roof areas that contains sharp angles and/or curves, have multiple roof area dividers or expansion joints, long and narrow MULTIPLIER - ROOF HAS GREATER THAN 4/12 SLOPE
Multiplier is applied when Roof Area has a Greater than 4/12 Slope, Steeper slope reduces overall labor production and requires additional safety precautions.

MULTIPLIER - ROOF HAS GREATER THAN 8/12 SLOPE
Multiplier is applied when Roof Area has a Greater than 8/12 Slope; Very steep slopes have a greater impact on overall labor production and require additional safety precautions.

MULTIPLIER - ROOF SIZE IS LESS THAN 500 SF
Multiplier is applied when Roof Size is less than 500 SF. Situation creates the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs

Page 601 ends

Cleaning & Caulking

23.01 Pressure Wash to Clean Horizontal Surfaces SF

23.02 Pressure Wash to Clean Vertical Surfaces SF

23.03 Pressure Wash with TSP or Simple Green to Clean Horizontal Surfaces SF

23.04 Pressure Wash with TSP or Simple Green to Clean Vertical Surfaces SF

23.05 Use a Brush to Wash Surface with TSP or Simple Green to Clean Horizontal Surfaces SF

23.06 Use a Brush to Wash Surface with TSP or Simple Green to Clean Vertical Surfaces SF

23.07 Prime Existing Asphalt-Based Roof Surface SF

23.08 Blow-Off Surface Area with Portable Blower to Remove Moisture SF

23.09 Spud and Scrape Aggregate from Roof Surface Asphalt BUR (Size Reference: 100' X 12") SF

23.10 Spud and Scrape of Aggregate from Roof Surface Coal Tar BUR (Size Reference: 100' X 12") SF

23.11 Remove & Dispose Loose Aggregate from Roof Surface (Wet Vac) SF

23.12 Power Broom Roof Surface SF

23.13 Remove & Dispose Ballast from Roof Surface SF

23.14 Remove & Dispose Ballast from Roof Surface at Approved Disposal Site SF

23.15 Remove Ballast from Roof Surface & Save for Reuse SF

23.16 Scrape / Sand Loose Paint from Exterior Building Surfaces and Clean-Up Debris SF

23.17 Sandblasting Paint from Exterior Building Surfaces and Re-Claim Sand SF

23.18 Apply Coating (Paint) to Horizontal Surface SF

23.19 Apply Coating (Paint) to Vertical Surface SF

23.20 Caulking: Remove Existing Caulking & Clean and Prime Joint LF

23.21 Install Backer Rod in Properly Prepared Opening, Polyethylene - 3/8” Diameter LF

23.22 Install Backer Rod in Properly Prepared Opening, Polyethylene - 1/2” Diameter LF

23.23 Install Backer Rod in Properly Prepared Opening, Polyethylene - 3/4” Diameter LF

23.24 Install Backer Rod in Properly Prepared Opening, Polyethylene - 1” Diameter LF Masonry section UNIT $ per Unit

23.25 Remove and Reset Bricks; 1-50 SF SF

23.26 Remove and Reset Bricks; Over 50 SF SF

23.27 Remove and Reset Blocks SF

23.28 Remove and Reset Coping Stones Each

23.29 Remove Bricks, Blocks, Coping Stones; 1-50 SF SF

23.30 Remove Bricks, Blocks, Coping Stones; Over 50 SF SF Brick, block and brick exterior wall maintenance, repair and application of protective coatings. UNIT $ per Unit

23.31 Selective Demolition of Concrete Block Masonry Units (CMU) with perimeter saw cutting- swing stage 4”, 6” and 8” block (high-rise) Each

23.32 Selective Demolition of Brick Masonry Units with perimeter saw cutting SF Selective Demolition of Mortar Joint with Perimeter Saw cutting UNIT $ per Unit

23.33 Removal of existing mortar ( ½” wide by ¾” depth) SF

23.34 Removal of existing mortar (¾” wide by ¾” depth) SF

23.35 Removal of existing mortar (½” wide by 1½” depth) SF

23.36 Removal of existing mortar (¾” wide by 1½” depth) SF New Pointing Work UNIT $ per Unit

23.37 Furnish and install new mortar (½” wide by ¾” depth) SF

23.38 Furnish and install new mortar (¾” wide by ¾” depth) SF

23.39 Furnish and install new mortar (½” wide by 1 ½” depth) SF

23.40 Furnish and install new mortar (¾” wide by 1 ½” depth) SF Removal of Roof Parapets UNIT $ per Unit

23.41 Removal of parapet wall (24” high) SF

23.42 Removal of parapet wall (42” high) SF

23.43 Removal of parapet wall (24” high) SF

23.44 Removal of parapet wall (42” high) SF
Reconstruction of Brick Masonry Roof Parapets UNIT $ per Unit

23.45 New brick masonry parapet w/stone coping and flashings (24” high) SF

23.46 New brick masonry parapet w/stone coping and flashings (42” high) SF

23.47 New brick masonry parapet w/stone coping and flashings (24” high) SF

23.48 New brick masonry parapet w/stone coping and flashings (42” high) SF New Through wall Flashings UNIT $ per Unit

23.49 Removal of 4 courses brick wall w/Temporary Shoring SF

23.50 Removal and replacement of steel lintel SF

23.51 Furnish and install new flashings (Bituthane) SF

23.52 Furnish and install new flashings (Lead coated copper) SF

23.53 Furnish and Install New Brick Masonry w/Weep Holes and Screens SF

23.54 Parging and waterproofing of back-up wall SF

Page 111 ends

Roof Coping Stones. UNIT $ per Unit

23.55 Removal of existing roof coping stones (16 inches) SF

23.56 Removal and parging of existing substrate SF

23.57 Furnish and install new lead coated copper flashings SF

23.58 Drilling and epoxy grouting stainless steel pins SF

23.59 Reinstallation of existing stones with cleaning SF

23.60 Furnish and install new coping stones SF

23.61 Furnish and install new sealants between coping stones. SF

23.62 Cleaning and coating of existing stones. SF
CMU Backup Wall Repair and Waterproofing. UNIT $ per Unit

23.63 Replacement of Deteriorated CMU Back-up SF

23.64 Parging of CMU back-up wall SF

23.65 Waterproofing of back-up wall SF
Crack Repair UNIT $ per Unit

23.66 Drill and install new stainless steel pins. Each

23.67 Grouting of open cracks SF

23.68 Replacement of cracked bricks SF
New Concrete and Coating UNIT $ per Unit

23.69 Placement of new high strength patching mortar (2” depth) SF

23.70 Placement of new high strength patching mortar (3.5” depth). SF

23.71 Cleaning and coating of concrete surface. SF

23.72 Sidewalk Bridging. SF

23.73 Temporary Roof Protection SF
Roof Drainage, Scuppers, Stacks, Curbs and Pitch Pockets UNIT $ per Unit

23.74 Install & Connect new 4" roof drain & Flashing; Excluding Plumbing EA

23.75 Install & Connect new 6" roof drain & Flashing; Excluding Plumbing EA

23.76 Install & Connect new 8" roof drain & Flashing; Excluding Plumbing EA

23.77 Pitch pocket, 24 gauge, GI, 12” x 12”, with storm collar, hemmed to outside, soldered corners and seams EA

23.78 Pitch pocket, 24 gauge, GI, 6” x 6”, with storm collar hemmed to outside, soldered corners and seams EA

23.79 Pitch pocket, 24 gauge, GI, 8” x 8”, with storm collar, hemmed to outside, soldered corners and seams EA

23.80 Plumbing stack, 16 oz. copper flashing EA

23.81 Plumbing stack, 24 gad Zinc flashing EA

23.82 Plumbing stack, 4# lead flashing EA

23.83 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 12" Straight EA

23.84 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 2" Corners EA

23.85 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 3" Kit EA

23.86 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 5" Kit EA

23.87 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 5" Rounds EA

23.88 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 6" Kit EA

23.89 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 6" Straight EA

23.90 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 7.5" Kit EA

23.91 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 7.5" Kit with 2-Part Filler EA

23.92 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 7.5" Rounds EA

23.93 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 9" Kit EA

23.94 Installation of Roof Curbs 2" X 4" LF

23.95 Installation of Roof Curbs 2" X 6" LF

23.96 Installation of Roof Curbs 2" X 8" LF

23.97 Installation of Coping/Edge Nailers 2" X 4" LF

23.98 Installation of Coping/Edge Nailers 2" X 6" LF

23.99 Installation of Coping/Edge Nailers 2" X 8" LF

23.100 Installation of Coping/Edge Nailers 2" X 10" LF

23.101 Installation of Coping/Edge Nailers 2" X 12" LF

23.102 Installation of Coping/Edge Nailers 2" X 14" LF

23.103 Installation of Coping/Edge Nailers 2" X 16" LF

23.104 Provide a cast iron drain strainer EA

23.105 Reflash existing roof drain EA

23.106 Scupper, .050 Aluminum, match existing configuration LF

23.107 Scupper, 16 oz Copper, match existing configuration LF

23.108 Scupper, 20 gad Stainless Steel, match existing configuration LF

23.109 Sleeper Cap - 24 Gad Galvanized LF
Roof Accessories UNIT $ per Unit

Page 112 ends

23.110 Walkway Pads

23.111 30" wide roll goods, tape attached EA

23.112 30" wide roll, hot asphalt attached EA

23.113 30" wide roll, adhesive attached EA

23.114 Expansion joint, butyl or neoprene bellows, galvanized flange LF

23.115 Roof ladder, security ladder guard EA

23.116 Roof ladder, steel, bolted to concrete, 20 feet and up, with cage; with intermediate landings as required by Code EA

23.117 Roof ladder, steel, bolted to concrete, up to 20 feet, without cage EA

23.118 Roof ventilators EA

23.119 Termination bar, aluminum, 1/4” x 1” LF
Common Roof Repair Items UNIT $ per Unit

23.120 3-Course Application; Mastic-Mesh-Mastic; 15" Wide Total; 12" Wide Mesh LF

23.121 3-Course Application; Mastic-Mesh-Mastic; 9" Wide Total; 6" Wide Mesh LF

23.122 3-Course Application; Urethane-Reinforcement-Urethane (< 500 SF) SF

23.123 3-Course Application; Urethane-Reinforcement-Urethane (> 500 SF) SF

23.124 Install Self-Adhering Cap Sheet Over Repair Area (< 500 SF) SF

23.125 Install Self-Adhering Cap Sheet Over Repair Area (> 500 SF) SF

23.126 Torch Cap Sheet Over Repair Area (< 500 SF) SF

23.127 Torch Cap Sheet Over Repair Area (> 500 SF) SF

23.128 Set Roofing Cap Sheet Membrane in Mastic Installed Over Repair Area (< 500 SF) SF

23.129 Set Roofing Cap Sheet Membrane in Mastic Installed Over Repair Area (> 500 SF) SF Leak Response & Preventive Maintenance UNIT $ per Unit

23.153 Leak Response Work Order Tracking & Dispatch EA

23.154 Leak Response Completion Report with Back-Up EA

23.155 Preventive Maintenance (Single Campus - All Roof Sections) SF

23.156 Preventive Maintenance (Multiple Campuses City-/County-wide - All Roof Sections) SF

23.157 Preventive Maintenance (Multiple Campuses State-wide - All Roof Sections) SF

23.155 Preventive Maintenance Performed Concurrent with Visual Inspection (Single Campus - All Roof Sections) SF

23.156 Preventive Maintenance Performed Concurrent with Visual Inspection (Multiple Campuses City- /County-wide - All Roof Sections) SF

23.157 Preventive Maintenance Performed Concurrent with Visual Inspection (Multiple Campuses State-wide - All Roof Sections) SF

23.158 Preventive Maitenance Completion Report with Back-Up EA Equipment UNIT $ per Unit

23.159 Folklift/Manlift Equipment Rental DAY

23.160 Crane Equipment Rental - up to 80' DAY

23.161 Crane Equipment Rental - up to 150' DAY

23.162 Manlift per day DAY

23.163 Skytrack DAY

23.164 Additional Equipment (rental) % off published price % Other Services UNIT $ per Unit

23.165 Demobilization - Pre-Planned or Additional Un-planned EA

23.166 Remobilization - Pre-Planned or Additional Un-planned EA Additional repair options UNIT $ per Unit

23.167
Option 1: Cost of Quote Plus Mark-Up (Used when repair and installation services line item pricing is not available and services performed are to be performed by a contractor. Requires a quote on corporate letterhead that cannot exceed $25,000)
Cost plus added to quote
%

23.168
Option 2: R.S. Means or Gordian Group Catalog (Used when repair and installation services line item pricing is not available)
Cost plus added to catalog pricing
%
Catalog Pricing UNIT $ per Unit

23.169 Please provide a price list with your complete material catalog(s) - A manufacturers catalog can be used. You may provide a net-price or a catalog with a discount.

Green Roofing UNIT $ per Unit

23.170 Please provide your green environmentally friendly roofing options, please provide as much information as possible to include line items necessary to complete a green roof

Page 113 ends

Aluminum
Size / Gauge .032 .040 .050 .063
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend
Sheet Metal Accessories Covered Under these Pricing Tables:
-Drip Edge
-Gravel Stop
-Gutters, Straps, Hangers & Fasteners
-Coping
-Surface Mounted Counter Flashing
-Reglet Mounted Counter Flashing
-Skirt Flashing
-Expansion Joints
-Miscellaneous Metal Fabricated Details

Page 114 ends
Page 605 ends

Stainless Steel & Copper
SS SS Copper Copper
24 Ga 26 Ga 16 oz 20 oz
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend
Kynar Coated Steel
Size / Gauge 16 Ga 20 Ga 22 Ga 24 Ga
6"
8"
10"
12"
14"
16"
18"
20"
Size / Gauge / Thickness

Page 115 ends
Page 606 ends

22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend
Galvanized Steel
Size / Gauge 16 Ga 20 Ga 22 Ga 24 Ga
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"

Page 116 ends
Page 607 ends

44"
46"
48"
Price Per Bend

Page 117 ends
Page 608 ends

Caulking Chart pricing per Linear Foot Installed
2 Component Epoxied Urethane Compound
Joint Size 1/8" 3/16" 1/4" 5/16" 3/18" 7/16" 1/2" 5/8" 3/4" 7/8" 1" 1-1/8" 1-1/4" 1/8"
3/16"
1/4"
5/16"
3/18"
7/16"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1-1/4"
Caulking Chart pricing per Linear Foot Installed
1 Component Polyurethane
Joint Size 1/8" 3/16" 1/4" 5/16" 3/18" 7/16" 1/2" 5/8" 3/4" 7/8" 1" 1-1/8" 1-1/4" 1/8"
3/16"
1/4"
5/16"
3/18"
7/16"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1-1/4"
Caulking Chart pricing per Linear Foot Installed
1 Component Silicone Rubber
Joint Size 1/8" 3/16" 1/4" 5/16" 3/18" 7/16" 1/2" 5/8" 3/4" 7/8" 1" 1-1/8" 1-1/4" 1/8"
3/16"
1/4"
5/16"
3/18"
7/16"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1-1/4"

Page 118 ends

Journeyman
Prevailing
Wage
Rate Roofer Mason Sheet Metal
$10.00
$12.50
$15.00
$17.50
$20.00
$22.50
$25.00
$27.50
$30.00
$32.50
$35.00
$37.50
$40.00
$42.50
$45.00
$47.50
$50.00
$52.50
$55.00
$57.50
$60.00
$62.50
$65.00
$67.50
$70.00
$72.50
$75.00
$77.50
$80.00
$82.50
$85.00
$87.50
$90.00
$92.50
$95.00
$97.50
$100.00
$102.50
$105.00
$107.50
$110.00
$112.50
$115.00
$117.50
$120.00
Line Item Multiplier to Adjust Labor Costs Based Upon the Prevailing Wage Rate.

Prevailing wage found at http://www.wdol.gov/dba.aspx#0 Multiplier
for Prevailing
Wage Rates

Page 610 ends

Attachment D – Experience Record

PUBLIC ENTITY PAST PERFORMANCE PROJECT EXAMPLES THAT ILLUSTRATE BIDDER’S QUALIFICATIONS FOR THIS CONTRACT
Bidder’s shall complete this Experience Record which entails submitted this form for two (2) turn-key roofing or waterproofing projects for public agencies in twenty-five (25) states; totaling fifty (50) projects. Projects shall meet the requirements outlined in the IFB. Use additional space as necessary.

Bidder must answer all questions completely and all information must be clear, accurate, and comprehensive. If all fields are not completed, the Bid is at risk for being rejected due to nonresponsiveness. It is not acceptable to indicate “See Attached”.

Project Title:

Example Project Number: Project Location (City & State):

Public Agency who Owned the
Contract:

Point of Contact at Public Agency (Name, Title, Working Phone Number, & Working E-mail Address) who can be reached and would be knowledgeable about the Project:

Performance & Payment Bond #: Surety Company:

Project Size (Sq. Ft.): Start & End Dates of Contract (to include original End Date as specified in the original Contract and Final End Date) – if applicable, include why project was delayed:

Types of Roofing System
Components:

Original and Final Contract Amount – if applicable, include why Final Contract Amount was different:

Brief Description of the Project to include Examples of its Relevance to this IFB:

Prime Contractor Name & Location
(City & State):

If applicable, State License #:

Subcontractor(s) Name & Location
(City & State):

If applicable, State License #(s):

Page 120 ends
Page 611 ends

Purchasing Department
Duane McKinney
730 Wisconsin Avenue
Racine, WI 53403
262-636-3700
fax: 262-636-3763
ADDENDUM 

INVITATION FOR BID
Roofing Supplies and Services, Waterproofing, and Related Products and Services
Bid # PW-1925
This Addendum has been prepared by:

Racine County
Duane McKinney
Date: Friday, August 23, 2019
To the Bidder of Record:

This Addendum is issued as stated in the original Invitation for Bid on page 3 in section A.1. to address questions received from vendors requesting clarification from Racine County on the specifications provided for the above subject proposal. Also, this Addendum, applicable to work referenced above, is an amendment to the Bid Form and specifications and as such will be a part of and included in the Contract Documents. Acknowledge receipt of this addendum by entering the Addendum number and issue date on the space provided below.

Clarifications

1. Exhibit B – Administration Agreement, Example in Attachment B – Requirements for National Cooperative Contract is replaced in this Addendum to utilize an updated version.

2. Attachment C – Bid Form is replaced in this Addendum to modify and add items outlined in Questions and Answers #6, 7, and 8, located below.

Questions and Answers

1. Question:

Are there any local prevailing wage determinations that bidder's should you as the basis of cost for Attachment C - Bid Form?
Answer:

Yes, Bidder’s are to follow prevailing wage determinations applicable in the locality for each craft or type of worker needed to perform the work outlined in this IFB. See Changes to the Specifications #2 included in this Addendum.

Addendum 1 - Page 1 of 66

Page 612 ends

Racine County
Roofing Supplies and Services, Waterproofing, and Related Products and Services August 2019

2. Question:

Is there a Microsoft Excel version of the Attachment C - Bid Form that bidder's can use to fill-out their pricing submission?
Answer:

Yes, the Excel version will be posted on Racine County’s website. Bidder’s are not to change the spreadsheet formatting.

3. Question:

Will Racine County, WI accept an installation floater in the minimum amount equal to the "full insurable value" of such equipment and 100% of the value of the Contract in lieu of a Builder's "All Risk" Insurance policy?
Answer:

Yes. See Changes to the Specifications #1 included in this Addendum.

4. Question:

Under C.4. the Alternative Costing Method, the procedure described seems to determine the basis of cost for goods and services not covered in the pricing schedule or are costumed designed. There is also a requirement for a discount. However, there does not appear to be an allowance in the procedure for overhead and profit. Is the intent for the bidder to provide a discount on the bidder's direct cost, which essentially means taking a loss on anything additional goods and services required throughout delivery on the resulting master agreement? Answer:

No, the intent is to ensure the successful Contractor is providing competitive pricing on goods and services not covered in the Pricing Schedule. The successful Contractor is permitted to include any additional necessary costs to the most advantageous cost proposal for all labor, equipment, material, tools, supplies, and incidentals necessary to complete all work required by the Contract resulting from this IFB.

5. Question:

Attachment C - Bid Form pricing schedule items numbers,1.40.02 & 23.168, both reference R.S.

Means or Gordian Group Catalogs to be used when line items are not available. a. Is this procedure additional to the alternative costing method provided in C.4.? b. Does the percentage filled-in by the bidder get applied to the catalog price or the catalog price adjusted to the local market (i.e. net the local market adjustment factor)? Answer:

The alternative costing method provided in C.4. is only for the successful Contractor for goods and services not covered in the Pricing Schedule; this includes items not covered in line items

1.40.02 and 23.169. For line items 1.40.02 and 23.168, the percentage filled-in by the Bidder is to be the percentage that is applied to the catalog price.

Addendum 1 - Page 2 of 66

Page 613 ends

Racine County
Roofing Supplies and Services, Waterproofing, and Related Products and Services August 2019

6. Question:

For the following item, Item 1.29, in Attachment C - Bid Form, can you confirm the unit sizes that are to be used? EA or ____?
Answer:

The unit for item 1.29 in Attachment C is EA. See Changes to the Specifications #4 included in this Addendum.

7. Question:

For the following group of items under line Item 12.05.03, two membrane options appear to be missing when compared to the other sections. If the bidder would like to propose on these options, should we include a separate file?
a. ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III – Minimum of 500 lbf/in tensile
b. ASTM D 6162 SBS Fiberglass/Polyester Reinforced Modified Bituminous Sheet Material Type III – Minimum of 600 lbf/in tensile
Answer:

See Changes to the Specifications #4 included in this Addendum.

8. Question:

For the following item, Item 18.05.02 – The pricing column for just that line item is highlighted gray. Should the bidder ignore the color and submit a price? Answer:

See Changes to the Specifications #4 included in this Addendum.

9. Question:

Does the bidder have the option to submit additional line item pricing for items that are unique to the bidder?
Answer:

Yes, see Section C. ROOFING SUPPLIES AND SERVICES, WATERPROOFING, AND RELATED PRODUCTS AND SERVICES SPECIFICATIONS, item #5 PRICE LIST FOR ADDITIONAL PRODUCTS.

Addendum 1 - Page 3 of 66

Page 614 ends

Racine County
Roofing Supplies and Services, Waterproofing, and Related Products and Services August 2019

10. Question:

By agreeing to the federal funding requirements set out in Attachment B, Exhibit D, is the bidder agreeing to follow these requirements on all projects delivered through the master agreement or only when the projects involve Federal funding and/or are performed directing for a Federal government agency?
Answer:

By agreeing to the Federal Funds Certifications, Exhibit D in Attachment B, the Bidder is agreeing to follow the requirements only when work, required by this Contract resulting from this IFB, involves federal funds from Federal and non-Federal entities.

Changes to the Specifications
 Page 6 – Section B. TERMS AND CONDITIONS, 2. INSURANCE, ii. Minimum Limits of Insurance:

Remove item 6., regarding Builder’s Risk, and replace witK the following:
 Installation Floater: Physical Damage Insurance which insures Racine County and Public Agencies for damages to all Property Purchased for, or Assigned to, the Project commencing on the start date through completion. Policy limits shall be in the minimum amount equal to the full insurable value of such equipment and 100% of the value of the contract herewith. The policy form shall be an All Risk form and shall include coverage for both during transit and while stored at the work site.

The remaining sections of Section B. TERMS AND CONDITIONS 2. INSURANCE, shall remain the same.

2. Page 11 – Section B. TERMS AND CONDITIONS
Insert the following to Section B. TERMS AND CONDITIONS:

6. PREVAILING WAGE REQUIREMENTS
Contractor agrees to follow all prevailing wage determinations applicable to the locality for each craft or type of worker needed to perform the work of this Contract to include each County in the State of Wisconsin. Prevailing Wages for the State of Wisconsin are located at http://dwd.wisconsin.gov/PrevailingWageSearch/PrevailingWage/SearchByCounty?Length=1 4 and incorporated by reference herein.

The remaining sections of Section B. TERMS AND CONDITIONS shall remain the same.

Addendum 1 - Page 4 of 66

Page 615 ends

Racine County
Roofing Supplies and Services, Waterproofing, and Related Products and Services August 2019

3. Page 31 – Attachment B - REQUIREMENTS FOR NATIONAL COOPERATIVE CONTRACT TO BE ADMINISTERED BY OMNIA PARTNERS, Exhibit B – Administration Agreement, Example
Remove Exhibit B – Administration Agreement, Example from Attachment B –

REQUIREMENTS FOR NATIONAL COOPERATIVE CONTRACT TO BE ADMINISTERED BY OMNIA PARTNERS in its entirety and replace with the revised version included in this Addendum. This is the version Bidder’s should use when submitting a bid for this project.

4. Page 80 – Attachment C – Bid Form
Remove Attachment C – Bid Form in its entirety and replace with the revised version included in this Addendum. This is the version Bidder’s should use when submitting a bid for this project.

This Addendum is sixty-six (66) pages in its entirety, including Attachments.

Attachments:

Exhibit B – Administration Agreement, Example (from Attachment B - REQUIREMENTS FOR NATIONAL COOPERATIVE CONTRACT TO BE ADMINISTERED BY OMNIA PARTNERS) – Eleven (11) pages
Attachment C – Bid Form – Forty (40) pages
Please sign, date and attach a copy of this Addendum to your bid.

Firm: ________________________________________________________________ Signature: ____________________________________________________________ Date: ________________________________________________________________ Addendum 1 - Page Page 616of 66

EXHIBIT B

ADMINISTRATION AGREEMENT, EXAMPLE

ADMINISTRATION AGREEMENT
This ADMINISTRATION AGREEMENT (“Agreement”) is made as of , by and between National Intergovernmental Purchasing Alliance Company, a Delaware corporation d/b/a OMNIA Partners, Public Sector (“OMNIA Partners, Public Sector”)and (“Supplier”).

RECITALS
WHEREAS, (“Lead Public Agency”) has entered into a certain Master Agreement dated as of even date herewith, referenced asAgreement No. , by and between Lead Public Agency and Supplier (as amended from time to time in accordance with the terms thereof, the “Master Agreement”) for the purchase of (the “Products and Services”); WHEREAS, the Master Agreement provides that any state, county, city, special district, local government, school district, private K-12 school, technical or vocational school, higher education institution (including community colleges, colleges and universities, both public and private), other government agency or nonprofit organization (each a “Public Agency” and collectively, “Public Agencies”) may purchase Products and Services at the prices indicated in the Master Agreement upon prior registration with OMNIA Partners Public Sector, in which case the Public Agency becomes a “Participating Public Agency”;
WHEREAS, OMNIA Partners Public Sector has the administrative and legal capacity to administer purchases under the Master Agreement to Participating Public Agencies; WHEREAS, OMNIA Partners Public Sector serves in an administrative capacity for Lead Public Agency and other lead public agencies in connection with other master agreements offered by OMNIA Partners Public Sector;
WHEREAS, Lead Public Agency desires OMNIA Partners Public Sector to proceed with administration of the Master Agreement on the same basis as other master agreements; WHEREAS, OMNIA Partners Public Sector and Supplier desire to enter into this Agreement to make available the Master Agreement to Participating Public Agencies.

NOW, THEREFORE, in consideration of the mutual covenants contained in this Agreement, OMNIA Partners Public Sector and Supplier hereby agree as follows:

Page 31 ends

Addendum 1 - Page 6 of 66

Page 617 ends

ARTICLE I

GENERAL TERMS AND CONDITIONS

1.1 The Master Intergovernmental Cooperative Purchasing Agreement (“Master Agreement”), attached hereto as Exhibit A and incorporated herein by reference as though fully set forth herein, and the terms and conditions contained therein shall apply to this Agreement except as expressly changed or modified by this Agreement.

1.2 OMNIA Partners Public Sector shall be afforded all of the rights and privileges afforded to Lead Public Agency under the Master Agreement, and such rights and privileges shall accrue and apply with equal effect to OMNIA Partners Public Sector under this Agreement including, without limitation, Supplier’s obligation to provide insurance to Lead Public Agency.

1.3 Supplier shall perform all duties, responsibilities and obligations required under the Master Agreement.

1.4 OMNIA Partners Public Sector shall perform all of its duties, responsibilities and obligations as administrator of purchases under the Master Agreement as set forth herein, and Supplier acknowledges that OMNIA Partners Public Sector shall act in the capacity of administrator of purchases under the Master Agreement.

1.5 With respect to any purchases made by Lead Public Agency or any Participating Public Agency pursuant to the Master Agreement, OMNIA Partners PublicSector:
(a) shall not be construed as a dealer, re-marketer, representative, partner, or agent of any type of Supplier, Lead Public Agency or such Participating Public Agency; (b) shall not be obligated, liable or responsible (i) for any orders made by Lead PublicAgency, any Participating Public Agency or any employee of Lead Public Agency or a Participating Public Agency under the Master Agreement, or (ii) for any payments required to be made with respect tosuch order; and
(c) shall not be obligated, liable or responsible for any failure by a Participating Public Agency to (i) comply with procedures or requirements of applicable law or ordinance, or (ii) obtain the due authorization and approval necessary to purchase under the Master Agreement.

OMNIA Partners Public Sector makes no representations or guaranties with respect to any minimum purchases required to be made by Lead Public Agency, any Participating Public Agency, or any employee of Lead Public Agency or a Participating Public Agency under the Master Agreement.

ARTICLE II

TERM OF AGREEMENT

2.1 This Agreement is effective as of and shall terminate upon termination of the Master Agreement or any earlier termination in accordance with the terms of this Agreement, provided,however, that the obligation to pay all amounts owed by Supplier to OMNIA Partners Public Sector through the termination of this Agreement and all indemnifications afforded by Supplier to OMNIA Partners Public Sector shall survive the term of thisAgreement.

Page 3 ends

Addendum 1 - Page 7 of 66

Page 618 ends

ARTICLE III

REPRESENTATIONS AND COVENANTS

3.1 OMNIA Partners Public Sector views the relationship with Supplier as an opportunity to provide benefits to the Lead Public Agency, Public Agencies and Supplier. The successful foundation of the relationship requires certain representations and covenants from both OMNIA Partners Public Sector andSupplier.

3.2 OMNIA Partners Public Sector’ Representations and Covenants. (a) Marketing. OMNIA Partners Public Sector shall proactively market the Master Agreement to Public Agencies using resources available to it from time to time, which may include an national, regional and state-level sponsors. In addition, the OMNIA Partners Public Sector staff shall make commercially reasonable efforts to enhance Supplier’s marketing efforts through meetings with Public Agencies, participation in key events and tradeshows and other marketing activity such as advertising, articles and promotionalcampaigns. (b) Training and Knowledge Management Support. OMNIA Partners Public Sector shall provide support for the education, training and engagement of Supplier’s sales force as provided herein. Through its staff (each, a “Program Manager” and collectively, the “Program Managers”), OMNIA Partners Public Sector shall, with scheduling assistance from Supplier, conduct training sessions and conduct calls jointly with Supplier to Public Agencies. OMNIA Partners Public Sector shall also provide Supplier with access to OMNIA Partners Public Sector’s private intranet website which provides presentations, documents and information to assist Supplier’s sales force in effectively promoting the Master Agreement.

3.3 Supplier’s Representations and Covenants. Supplier hereby represents and covenants as follows in order to ensure that Supplier is providing the highest level of public benefit to Participating Public Agencies (such representations and covenants are sometimes referred to as “Supplier’s Commitments” and are comprised of the Corporate Commitment, Pricing Commitment, Economy Commitment and SalesCommitment):
(a) Corporate Commitment.
(i) The pricing, terms and conditions of the Master Agreement shall, at all times, be Supplier’s primary contractual offering of Products and Services to Public Agencies. All of Supplier’s direct and indirect marketing and sales efforts to Public Agencies shall demonstrate that the Master Agreement is Supplier’s primary offering and not just one of Supplier’s contract options. (ii) Supplier’s sales force (including inside, direct and/or authorized dealers, distributors and representatives) shall always present the Master Agreement when marketing Products or Services to PublicAgencies.
(iii) Supplier shall advise all Public Agencies that are existing customers of Supplier as to the pricing and other value offered through the Master Agreement. (iv) Upon authorization by a Public Agency, Supplier shall transition such Public Agency to the pricing, terms and conditions of the Master Agreement. (v) Supplier shall ensure that the OMNIA Partners Public Sector program and the Master Agreement are actively supported by Supplier’s seniorexecutive management.

Page 33 ends

Addendum 1 - Page 8 of 66

Page 619 ends

(vi) Supplier shall provide a national/senior management level representative with the authority and responsibility to ensure that the Supplier’s Commitments are maintained at all times. Supplier shall also designate a lead referral contact person who shall be responsible for receiving communications from OMNIA Partners Public Sector concerning new Participating Public Agency registrations and for ensuring timely follow-up by Supplier’s staff to requests for contact from Participating Public Agencies. Supplier shall also provide the personnel necessary to implement and support a supplier-based internet web page dedicated to Supplier’s OMNIA Partners Public Sector program and linked to OMNIA Partners Public Sector’s website and shall implement and support such web page.
(vii) Supplier shall demonstrate in its procurement solicitation response and throughout the term of the Master Agreement that national/senior management fully supports the OMNIA Partners Public Sector program and its commitments and requirements. National/Senior management is defined as the executive(s) with companywideauthority. (viii) Where Supplier has an existing contract for Products and Services with a state, Supplier shall notify the state of the Master Agreement and transition the state to the pricing, terms and conditions of the Master Agreement upon the state’s request. Regardless of whether the state decides to transition to the Master Agreement, Supplier shall primarily offer the Master Agreement to all Public Agencies located within thestate.
(b) Pricing Commitment.
(i) Supplier represents to OMNIA Partners Public Sector that the pricing offered under the Master Agreement is the lowest overall available pricing (net to purchaser) on Products and Services that it offers to Public Agencies. Supplier’s pricing shall be evaluated on either an overall project basis or the Public Agency’s actual usage for more frequently purchased Products and Services. (ii) Contracts Offering Lower Prices. If a pre-existing contract and/or a Public Agency’s unique buying pattern provide one or more Public Agencies a lower price than that offered under the Master Agreement, Supplier shall match that lower pricing under the Master Agreement and inform the eligible Public Agencies that the lower pricing is available under the Master Agreement.

If an eligible Public Agency requests to be transitioned to the Master Agreement, Supplier shall do so and report the Public Agency’s purchases made under the Master Agreement going forward. The price match only applies to the eligible Public Agencies. Below are three examples of Supplier’s obligation to match the pricing under Supplier’s contracts offering lower prices. (A) Supplier holds a state contract with lower pricing that is available to all Public Agencies within the state. Supplier would be required to match the lower state pricing under the Master Agreement and make it available to all Public Agencies within the state.
(B) Supplier holds a regional cooperative contract with lower pricing that is available only to the ten cooperative members. Supplier would be required to match the lower cooperative pricing under the Master Agreement and make it available to the ten cooperative members.
(C) Supplier holds a contract with an individual Public Agency. The Public Agency contract does not contain any cooperative language and therefore other Public Agencies are not eligible to utilize the contract. Supplier would be required to match the lower pricing under the Master Agreement and make it available only to the individual Public Agency.

Page 34 ends

Addendum 1 - Page 9 of 66

Page 620 ends

(iii) Deviating Buying Patterns. Occasionally OMNIA Partners Public Sector and Supplier may interact with a Public Agency that has a buying pattern or terms and conditions that considerably deviate from the normal Public Agency buying pattern and terms and conditions, and causes Supplier’s pricing under the Master Agreement to be higher than an alternative contract held by Supplier. This could be created by a unique end-user preference or requirements. In the event that this situation occurs, Supplier may address the issue by lowering the price under the Master Agreement on the item(s) causing the large deviation for that Public Agency. Supplier would not be required to lower the price for other PublicAgencies.
(iv) Supplier’s Options in Responding to a Third Party Procurement Solicitation. While it is the objective of OMNIA Partners Public Sector to encourage Public Agencies to piggyback on to the Master Agreement rather than issue their own procurement solicitations, the Parties recognizes that for various reasons some Public Agencies will issue their own solicitations. The following options are available to Supplier when responding to a Public Agency solicitation:
(A) Supplier may opt not to respond to the procurement solicitation.

Supplier may make the Master Agreement available to the Public Agency as a comparison to its solicitation responses.
(B) Supplier may respond with the pricing, terms and conditions of the Master Agreement. If Supplier is awarded the contract, the sales would be reported as sales under the Master Agreement.
(C) If competitive conditions require pricing lower than the standard Master Agreement pricing, Supplier may submit lower pricing through the Master Agreement. If Supplier is awarded the contract, the sales would be reported as sales under the Master Agreement. Supplier would not be required to extend the lower price to otherPublic Agencies. (D) Supplier may respond to the procurement solicitation with pricing that is higher (net to buyer) than the pricing offered under the Master Agreement. If awarded a contract, Supplier shall still be bound by all obligations set forth in this Section 3.3, including, without limitation, the requirement to continue to advise the awarding Public Agency of the pricing, terms and conditions of the Master Agreement. (E) Supplier may respond to the procurement solicitation with pricing that is higher (net to buyer) than the pricing offered under the Master Agreement and if an alternative response is permitted, Supplier may offer the pricing under the Master Agreement as an alternative forconsideration.
(c) Economy Commitment. Supplier shall demonstrate the benefits, including the pricing advantage, of the Master Agreement over alternative options, including competitive solicitation pricing and shall proactively offer the terms and pricing under the Master Agreement to Public Agencies as a more effective alternative to the cost and time associated with such alternate bids and solicitations. (d) Sales Commitment. Supplier shall market the Master Agreement through Supplier’s sales force or dealer network that is properly trained, engaged and committed to offering the Master Agreement as Supplier’s primary offering to Public Agencies. Supplier’s sales force compensation and incentives shall be greater than or equal to the compensation and incentives earned under other contracts to PublicAgencies.

Page 35 ends

Addendum 1 - Page 10 of 66

Page 621 ends

(i) Supplier Sales. Supplier shall be responsible for proactive sales of Supplier’s Products and Services to Public Agencies and the timely follow-up to sales leads identifiedby OMNIA Partners Public Sector. Use of product catalogs, targeted advertising, direct mail, online marketing and other sales initiatives are encouraged. All of Supplier’s sales materials targeted towards Public Agencies shall include the OMNIA Partners Public Sector logo. OMNIA Partners Public Sector hereby grants to Supplier, during the term of this Agreement, a non-exclusive, revocable, nontransferable, license to use the OMNIA Partners Public Sector name, trademark, and logo solely to perform its obligations under this Agreement, and for no other purpose. Any goodwill, rights, or benefits derived from Supplier's use of the OMNIA Partners Public Sector name, trademark, or logo shall inure to the benefit of OMNIA Partners Public Sector. OMNIA Partners Public Sector shall provide Supplier with its logo and the standards to be employed in the use of the logo. During the term of the Agreement, the Supplier shall provide OMNIA Partners Public Sector with its logo and the standards to be employed in the use of the logo for purposes of reproducing and using Supplier’s name and logo in connection with the advertising, marketing and promotion of the Master Agreement to Public Agencies. Supplier shall assist OMNIA Partners Public Sector by providing camera-ready logos and by participating in related trade shows and conferences. At a minimum, Supplier's sales initiatives shall communicate that (i) the Master Agreement was competitively solicited by the Lead Public Agency, (ii) the Master Agreement provides the Supplier’s best overall pricing and value to eligible agencies, (iii) there is no cost to Participating Public Agencies, and (iv) the Master Agreement is a non-exclusive contract. (ii) Branding and Logo Compliance. Supplier shall be responsible for complying with the OMNIA Partners Public Sector branding and logo standards and guidelines. Prior to use by Supplier, all OMNIA Partners Public Sector related marketing material must be submitted to OMNIA Partners Public Sector for review andapproval. (iii) Sales Force Training. Supplier shall train its national sales force on the Master Agreement and OMNIA Partners Public Sector program. OMNIA Partners Public Sector shall be available to train on a national, regional or local level and generally assist with the education of salespersonnel.
(iv) Participating Public Agency Access. Supplier shall establish the following communication links to facilitate customer access and communication:
(A) A dedicated OMNIA Partners Public Sector internet webbasedhomepage that is accessible from Supplier’s homepage or main menu navigation containing:
(1) OMNIA Partners Public Sector standardlogo;
(2) Copy of original procurementsolicitation;
(3) Copy of Master Agreement including any amendments;
(4) Summary of Products and Servicespricing;
(5) Electronic link to OMNIA Partners Public Sector’s
online registration page; and
(6) Other promotional material as requested by
OMNIA Partners Public Sector.
(B) A dedicated toll-free national hotline for inquiries regarding OMNIA Partners Public Sector.
(v) Electronic Registration. Supplier shall be responsible for ensuring that each Public Agency has completed OMNIA Partners Public Sector’s online registration process prior to processingthe Public Agency’s first sales order.

Page 36 ends

Addendum 1 - Page 11 of 66

Page 622 ends

(vi) Supplier’s Performance Review. Upon request by OMNIA Partners Public Sector, Supplier shall participate in a performance review meeting with OMNIA Partners Public Sector to evaluateSupplier’s performance of the covenants set forth in thisAgreement. (vii) Supplier Content. Supplier may, from time to time, provide certain graphics, media, and other content to OMNIA Partners Public Sector (collectively "Supplier Content") for use on OMNIA Partners Public Sector websites and for general marketing and publicity purposes.

During the term of the Agreement, Supplier hereby grants to OMNIA Partners Public Sector and its affiliates a non-exclusive, worldwide, free, transferrable, license to reproduce, modify, distribute, publicly perform, publicly display, and use Supplier Content in connection with OMNIA Partners Public Sector websites and for general marketing and publicity purposes, with the right to sublicense each and every such right. Supplier warrants that: (a) Supplier is the owner of or otherwise has the unrestricted right to grant the rights in and to Supplier Content as contemplated hereunder; and (b) the use of Supplier Content and any other materials or services provided to OMNIA Partners Public Sector as contemplated hereunder will not violate, infringe, or misappropriate the intellectual property rights or other rights of any third party

3.4 Breach of Supplier’s Representations and Covenants. The representations and covenants set forth in this Agreement are the foundation of the relationship between OMNIA Partners Public Sector and Supplier. If Supplier is found to be in violation of, or non-compliance with, one or more of the representations and covenants set forth in this Agreement, Supplier shall have ninety (90) days from the notice of default to cure such violation or non-compliance and, if Supplier fails to cure such violation or non-compliance within such notice period, at the sole discretion of OMNIA Partners Public Sector, it shall be deemed a cause for immediate termination of the Master Agreement at Lead Public Agency’s sole discretion or this Agreement at OMNIA Partners Public Sector’s sole discretion.

3.5 Indemnity. Supplier hereby agrees to indemnify and defend OMNIA Partners Public Sector, and its parent companies, subsidiaries, affiliates, shareholders, member, manager, officers, directors, employees, agents, and representatives from and against any and all claims, costs, proceedings, demands, losses, damages, and expenses (including, without limitation, reasonable attorney's fees and legal costs) of any kind or nature, arising from or relating to, any actual or alleged breach of any of Supplier's representations, warranties, or covenants inthis Agreement.

ARTICLE IV

PRICING AUDITS

4.1 Supplier shall,atSupplier’s sole expense,maintain an accounting of all purchases made by Lead Public Agency and Participating Public Agencies under the Master Agreement.

OMNIA Partners Public Sector and Lead Public Agency each reserve the right to audit the accounting for a period of three (3) years from the time such purchases are made. This audit right shall survive termination of this Agreement for a period of one (1) year from the effective date of termination. OMNIA Partners Public Agencies shall have the authority to conduct random audits of Supplier’s pricing that is offered to Participating Public Agencies at OMNIA Partners Public Sector’s sole cost and expense. In addition, in the event that OMNIA Partners Public Sector is made aware of any pricing being offered to three (3) or more Participating Public Agencies that is materially inconsistent with the pricing under the Master Agreement, OMNIA Partners Public Sector shall have the right to conduct a reasonable audit of Supplier’s pricing at Supplier’s sole cost and expense during regular business hours and upon reasonable notice. OMNIA Partners Public Sector may conduct the audit internally or may engage a third-party auditing firm. Supplier shall solely be UHVSRQVLEOHIRUWKHFRVW

Page 37 ends

Addendum 1 - Page 12 of 66

Page 623 ends

of the audit. Inthe event of an audit, the requestedmaterials shall be providedin the format and atthe locationwhere kept in the ordinary course ofbusinessbySupplier.

ARTICLE V

FEES & REPORTING

5.1 Administrative Fees. Supplier shall pay to OMNIA Partners Public Sector a monthly administrative fee based upon the total sales price of all purchases shipped and billed pursuant to the Master Agreement, excluding taxes, in the amount of tZR percent (%) of aggregate purchases made during each calendar month (individually and collectively, “Administrative Fees”). Supplier’s annual sales shall be measured on a calendar year basis. All Administrative Fees shall be payable in U.S. Dollars and shall be made by wire to OMNIA Partners Public Sector, or its designee or trustee as may be directed in writing by OMNIA Partners Public Sector. Administrative Fees shall be due and payable within thirty (30) days of the end of each calendar month for purchases shipped and billed during such calendar month. OMNIA Partners Public Sector agrees to pay to Lead Public Agency five percent (5%) of all Administrative Fees received from Supplier to help offset Lead Public Agency’s costs incurred in connection with managing the Master Agreement nationally. The Supplier’s obligations to pay Administrative Fees based on aggregate purchases calculated and accrued during the term of the Agreement shall survive the termination of the Agreement and the Master Agreement, regardless of reason for the termination.

5.2 Sales Reports. Within thirty (30) days of the end of each calendar month, Supplier shall deliver to OMNIA Partners Public Sector an electronic accounting report, in the format prescribed by the Contract Sales Reporting Template, attached hereto as Exhibit B, summarizing all purchases made under the Master Agreement during such calendar month (“Sales Report”). All purchases indicated in the Sales Report shall be denominated in U.S. Dollars. All purchases shipped and billed pursuant to the Master Agreement for the applicable calendar month shall be included in the Sales Report. Submitted reports shall be verified by OMNIA Partners Public Sector against its registration database. Any data that is inconsistent with the registration database shall be changed prior to processing. OMNIA Partners Public Sector reserves the right upon reasonable advance notice to Supplier to change the prescribed report format to accommodate the distribution of the Administrative Fees to its program sponsors, state associations and/or Lead Agencies.

5.3 Exception Reporting/Sales Reports Audits. OMNIA Partners Public Sector or its designee may, at its sole discretion, compare Supplier’s Sales Reports with Participating Public Agency records or other sales analysis performed by Participating Public Agencies, sponsors, or OMNIA Partners Public Sector staff. If there is a material discrepancy between the Sales Report and such records or sales analysis as determined by OMNIA Partners Public Sector, OMNIA Partners Public Sector shall notify Supplier in writing and Supplier shall have thirty (30) days from the date of such notice to resolve the discrepancy to OMNIA Partners Public Sector’s reasonable satisfaction. Upon resolution of the discrepancy, Supplier shall remit payment to OMNIA Partners Public Sector’s trustee within fifteen (15) calendar days. Any questions regarding an exception report should be directed to OMNIA Partners Public Sector in writing. If Supplier does not resolve the discrepancy to OMNIA Partners Public Sector’s reasonable satisfaction within thirty (30) days, OMNIA Partners Public Sector shall have the right to engage outside services to conduct an independent audit of Supplier’s reports. Supplier shall solely be responsible for the cost of the audit.

5.4 Online Reporting. Within forty-five (45) days of the end of each calendar month, OMNIA Partners Public Sector shall provide online reporting to Supplier containing Supplier’s sales reporting for such calendar month. Supplier shall have access to various reports through the OMNIA Partners Public Sector intranet website. Such reports are useful in resolving reporting issues and

Page 38 ends

Addendum 1 - Page 13 of 66

Page 624 ends

enabling Supplier to better manage its Master Agreement.

5.5 Usage Reporting. Within thirty (30) days of the end of each contract year, Supplier shall deliver to OMNIA Partners Public Sector an electronic usage report of all sales under the Master Agreement, including:
(i) Supplier’s Product Number
(ii) Product Description
(iii) Manufacturer Name
(iv) Manufacturer Number
(v) Unit of Measure
(vi) OMNIA Partners Public SectorPrice
(vii) Number of times ordered
(viii) Units sold
(ix) Sales by Manufacturer

5.6 Supplier’s Failure to Provide Reports or Pay Administrative Fees. Failure to provide a Sales Report or pay Administrative Fees within the time and in the manner specified herein shall be regarded as a material breach under this Agreement and if not cured within thirty (30) days of written notice to Supplier, shall be deemed a cause for termination of the Master Agreement at Lead Public Agency’s sole discretion or this Agreement at OMNIA Partners Public Sector’s sole discretion. All Administrative Fees not paid within thirty (30) days of the end of the previous calendar month shall bear interest atthe rate of one and one-half percent (1.5%) per month until paid infull.

ARTICLE VI

MISCELLANEOUS

6.1 Entire Agreement. This Agreement supersedes any and all other agreements, either oral or in writing, between the parties hereto with respect to the subject matter hereof, and no other agreement, statement, or promise relating to the subject matter of this Agreement which is not contained herein shall be valid or binding.

6.2 Assignment.
(a) Supplier. Neither this Agreement nor any rights or obligations hereunder shall be assignable by Supplier without prior written consent of OMNIA Partners Public Sector, and any assignment without such consent shall bevoid.
(b) OMNIA Partners Public Sector. This Agreement and any rights or obligations hereunder may be assigned by OMNIA Partners Public Sector in OMNIA Partners Public Sector’s sole discretion, to an existing or newly established legal entity that has the authority and capacity to perform OMNIA Partners Public Sector’s obligations hereunder.

6.3 Notices. All reports, notices or other communications given hereunder shall be delivered by first-class mail, postage prepaid, or overnight delivery requiring signature on receipt to the addresses as set forth below. OMNIA Partners Public Sector may, by written notice delivered to Supplier, designate any different address to which subsequent reports, notices or other communications shall be sent.

Page 39 ends

Addendum 1 - Page 14 of 66

Page 625 ends

OMNIA Partners Public Sector: OMNIA Partners, Public Sector Attn: President
840 Crescent Centre Drive
Suite 600
Franklin, TN 37067
Supplier: .

Attn: OMNIA Partners Public Sector Program Manager

6.4 Severability. If any provision of this Agreement shall be deemed to be, or shall in fact be, illegal, inoperative or unenforceable, the same shall not affect any other provision or provisions herein contained or render the same invalid, inoperative or unenforceable to anyextent whatever.

6.5 Waiver. Any failure of a party to enforce, for any period of time, any of the provisions under this Agreement shall not be construed as a waiver of such provisions or of the right of said party thereafter to enforce each and every provision under this Agreement.

6.6 Counterparts. This Agreement may be executed in several counterparts, each of which shall be an original and all of which shall constitute but one and the same instrument.

6.7 Modifications. This Agreement may not be effectively amended, changed, modified, altered or terminated without the prior written consent of the partieshereto.

6.8 Mediation. In the event that there is a dispute over any of the provisions of this Agreement, an asserted breach of the Agreement, or a dispute over the applicability or legality of any of the provisions of this Agreement, the parties agree that they will mediate such dispute or assertedbreach as a condition precedent to any proceeding brought in any court or administrative forum. The moving party shall provide the other with ten (10) business days written notice and demand for mediation.

Mediation shall occur between executive officials of each party who shall have full authority to resolve the dispute or asserted breach. Mediation shall occur at a mutually convenient venue or telephonically at the option of OMNIA Partners Public Sector. The parties shall endeavor to conclude such mediation within forty-five (45) days of the written demand, but may mutually agree in writing to extend this timeframe. If the mediation is not concluded within forty-five (45) days of the written demand, the mediation requirement may be deemed satisfied at the sole discretion of OMNIA Partners Public Sector. In no event shall the mediation bar extend past six (6) months unless agreed to in writing by both parties. The parties shall cover their own costs ofmediation.

6.9 Applicable law, Jurisdiction, Venue and Fees. This Agreement shall be governed by the laws of the State of Tennessee and applicable federal law. If, following the mandatory mediation in paragraph 6.8, either party brings against the other any proceeding arising out of this Agreement, that party may bring that proceeding only in the United States District Court for the Middle District of Tennessee, only if there is not federal subject matter jurisdiction or diversity, in the Circuit or Chancery Court for Williamson County, Tennessee. Each party submits to the exclusive jurisdiction of thesecourts for purposes of any such proceeding and waives any contest to venue. The prevailing party in any such proceeding shall be entitled to recover reasonable attorneys’ fees andcosts.

7.0 Successors and Assigns. This Agreement shall inure to the benefit of and shall be binding upon OMNIA Partners Public Sector, Supplier and any successor and assign thereto; subject, however, to the limitations contained herein.
[Remainder of Page Intentionally Left Blank – Signatures Follow]

Page 40 ends

Addendum 1 - Page 15 of 66

Page 626 ends

IN WITNESS WHEREOF, OMNIA Partners Public Sector has caused this Agreement to be executed in its name and Supplier has caused this Agreement to be executed in its name, all as of the date first written above.

OMNIA PARTNERS PUBLIC SECTOR
By
Name: Sarah E. Vavra
Title: Sr. Vice President, Public Sector Contracting
Date:

Supplier:

By
Name:

Title:

Date:

Page 41 ends

Addendum 1 - Page 16 of 66

Page 627 ends

Line Item Unit $ per Unit

1.00 Roof Management, Design Assistant and/or Professional Services

1.01 Full-time Quality Assurance monitoring DAY

1.02 Asbestos core testing and analysis (testing only, excludes labor for sampling and repair) EA

1.03 Analysis and evaluation (14” x 14” roof core) (Lab testing only, repairs charged at roof repair rates for appropriate system type) EA

1.04 Aerial Roof Survey - Roof Pictures & Drawings Including Geometries, Slope, Calculated Area and Perimeter Measurements EA

1.05 Aerial Wall Survey - Wall Pictures & Drawings Including Geometries, Calculated Area and Perimeter Measurements EA

1.06 Manufacturer Standing Seam Material Quantity Estimating EA

1.07 Nuclear Moisture Survey, Non destructive roof scan

1.07.01 Non destructive roof scan, up to 20 000 SF EA

1.07.02 Non destructive roof scan, over 20,000 SF SF

1.08 Infrared Moisture Scanning

1.08.01 Non destructive infrared roof scan, up to 20 000 SF EA

1.08.02 Non destructive infrared roof scan, over 20,000 SF SF

1.08.03 Aerial infrared roof scan at night TRIP

1.09 Infrared scanning equipment rental DAY

1.10 Roof investigation (visual roof survey)

1.10.01 Roof Investigation (Roof by Roof), per hour HOUR

1.10.02 Visual Roof Survey (Roof by Roof) up to 20,000 SF EA

1.10.03 Visual Roof Survey (Roof by Roof) over 20,000 SF SF

1.10.04 Visual Roof Survey (Single Campus - All Roof Sections) SF

1.10.05 Visual Roof Survey (Multiple Campuses City-/County-wide - All Roof Sections) SF

1.10.06 Visual Roof Survey (Multiple Campuses State-wide - All Roof Sections) SF

1.10.07 Roof core cut (roof by roof) EA

1.10.08 Roof core cut per roof section (all roof sections on campus(s)) EA

1.11 Comprehensive reporting

1.11.01 Comprehensive report for visual survey (Roof by Roof) EA

1.11.02 Comprehensive report for visual survey(All Roof Sections on Campus(es) EA

1.11.03 Comprehensive report for each roof section(s) surveyed (Item 1.07) or scanned (Item 1.08) EA

1.11.04 Comprehensive report enertered into on-line data base for dynamic reporting and tracking all roofing sections on Campus(s) EA

1.12 Manufacturer's Technical Representative Contractor Training Session at Job Start-Up DAILY

1.13 Wind Uplift Testing – Mobilize and provide wind uplift testing per Factory Mutual System Roof Design Manual FM 1-52 EA

1.14 Roof drawings to scale with all rooftop equipment and penetrations

1.14.01 Roof drawings (Roof by Roof) EA

1.14.02 Roof drawings (All Roof Sections on Campus(es) EA

1.15 Project Building Code Review EA

1.16 Additional and Occasional Services

1.16.01 Project Architect for Design Professional Services HOUR

1.16.02 Principle Architect for Design Professional Services HOUR

1.16.03 Project Engineer for Engineering Reviews HOUR

1.16.04 Principle Architect for Engineering Reviews HOUR

1.16.06 Roof Consultant HOUR

1.16.07 Full-Time Job Site Superintendent DAY

1.16.08 CAD Draftsman HOUR

1.17 Laboratory Analysis

1.17.01 Laboratory Fungal Analysis: Cultured Fungi Identification & Enumeration (Not including engineering time for sampling) EA

1.17.02 Laboratory Fungal Analysis: Total Fungi Spore Count (Not including engineering time for sampling) EA

1.17.03 Laboratory Mold Analysis: Viable Airborne Mold Analysis (Not including engineering time for sampling) EA
IFB #PW1908 Roofing Supplies and Services, Waterproofing, and Related Products and Services Attachment C - Bid Form

Page 1 of 50 ends

Addendum 1 - Pa Page 628ge 17 of 66

1.17.04 Laboratory Analysis: Viable Surface Swab or Bulk Substrate Analysis (Not including engineering time for sampling) EA

1.17.05 Laboratory Analysis: Non-Viable Surface Swab or Bulk Substrate Analysis (Not including engineering time for sampling) EA

1.17.06 Destructive Roof Sample Analysis:

Comprehensive laboratory testing of a core sample from an existing roof to include tensile/tear strength, scrim type, interply bitumen weight and roof composition; Repair the roof core area with similar materials. EA

1.18 Travel Expenses

1.18.01 Per Diem – Meals and Incidentals DAY

1.18.02 Lodging DAY

1.18.03 Mileage on Company / Personal Vehicle MILE

1.18.04 Airfare (Economy) JOB

1.18.05 Vehicle Rental DAY

1.19 Seamer Rental Charges DAY

1.20 Set-up Charges for Metal In-Shop Fabrication EA

1.21 Set-up On-Site Roll Forming EA

1.22 Roof Fastener Pull Tests (As Many as Required per Roof Section) EA

1.23 Wind Uplift Design Calculations EA

1.24 Roof Drainage Capacity Calculations EA

1.25 Roof Edge Metal Calculations - ANSI/SPRI ES-1 Standards EA

1.26 Dew Point Calculations EA

1.27 Energy Payback Calculations EA

1.28 Project Life-Cycle Cost Calculation EA

1.29 Substantial Completion Walkthrough with Report and Punchlist EA

1.30 Final Walkthrough with Report EA

1.31 On-Site Quality Control Inspections with Report from Manufacturer's Rep - 3 Days per Week WEEK

1.32 "As-Built" Drawings Upon Project Completion EA

1.33 R.A. or P.E. Reviewed and Stamped Shop Drawings EA

1.34 R.A. or P.E. Reviewed and Stamped Specifications EA

1.35 Non-R.A./P.E. Reviewed Shop Drawings EA

1.36 Project Design Assistance - Hourly Rate for Consultations with Architect of Record EA

1.37 Project Design Assistance - Development of a recommended specification for a roofing or waterproofing project EA

1.38 Roof Asset Management Report with recommended options for future course of actions and associated budgets for capital expense and maintenance planning. EA

1.39 Five year capital expense and maintenance plan ( All roof section on for campus(es)) EA

1.40 Additional Professional Services

1.40.01 Option 1: Professional Services (Third party architectural design, engineering or consulting services quote on corporate letterhead)
Cost plus added to quote %

1.40.02 Option 2: R.S. Means or Gordian Group Catalog (Used when professional services line item pricing is not available)
Cost plus added to catalog pricing %

2.00 Tear-off & Dispose of Debris

2.01 SF

2.02 SF

2.03 SF

2.04 SF

2.05 SF

2.06 SF

2.07 SF

SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Wood / Tectum Deck

SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Lightweight / Gyp Deck

SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Metal Deck

SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Wood / Tectum Deck

SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Lightweight / Gyp Deck

SYSTEM TYPE
BUR W/ Insulation and Gravel Surfacing - Concrete Deck

SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Metal Deck

Page 2 of 50 ends

Addendum 1 - Pa Page 629ge 18 of 66

2.08 SF

2.09 SF

2.10 SF

2.11 SF

2.12 SF

2.13 SF

2.14 SF

2.15 SF

2.16 SF

2.17 SF

2.18 SF

2.19 SF

2.20 SF

2.21 SF

2.22 SF

2.23 SF

2.24 SF

2.25 SF

2.26 SF

2.27 SF

2.28 SF

2.29 SF

2.30 SF

2.31 SF

2.32 SF

2.33 SF

2.34 SF

2.35 SF

SYSTEM TYPE
BUR W/ Insulation and Mineral Surfacing - Concrete Deck

SYSTEM TYPE
Single-Ply W/ Insulation - Metal Deck

SYSTEM TYPE
Single-Ply W/ Insulation - Wood / Tectum Deck

SYSTEM TYPE
Single-Ply W/ Insulation - Lightweight / Gyp Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Wood / Tectum Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Lightweight / Gyp Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Concrete Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Metal Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Wood / Tectum Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Lightweight / Gyp Deck

SYSTEM TYPE
Single-Ply W/ Insulation - Concrete Deck

SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Metal Deck

SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Wood / Tectum Deck

SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Lightweight / Gyp Deck

SYSTEM TYPE
Ballasted Single-Ply W/ Insulation - Concrete Deck

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Gravel Surfacing - Metal Deck

SYSTEM TYPE
3-Tab Shingle Roof - Wood Deck

SYSTEM TYPE
Clay Tile Shingle Roof - Wood Deck

SYSTEM TYPE
Concrete Tile Shingle Roof - Wood Deck

SYSTEM TYPE
Slate Tile Shingle Roof - Wood Deck

SYSTEM TYPE
Cedar / Wood Shake Shingle Roof - Wood Deck

SYSTEM TYPE
Add to save good Clay Tile Shingles for reuse

SYSTEM TYPE
Coal Tar BUR W/ Insulation and Mineral Surfacing - Concrete Deck

SYSTEM TYPE
Metal Roofing System - Metal Deck

SYSTEM TYPE
Metal Roofing System - Wood / Tectum Deck

SYSTEM TYPE
Metal Roofing System - Lightweight / Gypsum Deck

SYSTEM TYPE
Metal Roofing System - Concrete Deck

SYSTEM TYPE
Dimensional/Architectural Shingle Roof - Wood Deck

Page 3 of 50 ends

Addendum 1 - Pa Page 630ge 19 of 66

2.36 SF

2.37 SF

2.38 SF

2.39 SF

2.40 SF

2.41 SF

2.42 SF

2.43 SF

2.44 SF

2.45 SF

2.46 SF

2.47 SF

2.48 SF

2.49 SF

2.99 %

3.00 Removal & Replacement of Roof Deck

3.01 SF

3.02 SF

3.03 SF

3.04 SF

3.05 SF

3.06 SF

3.07 SF

3.08 SF

3.09 SF

3.10 SF

3.11 SF

SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Concrete Deck

SYSTEM TYPE
Add of Each Additional Average Depth 1" of Polyurethane Foam (PUF) Roofing

SYSTEM TYPE
BUR w/ Gravel Surfacing to the Existing Insulation (Insulation to be Re-Used)

SYSTEM TYPE
BUR w/ Mineral Surfacing to the Existing Insulation (Insulation to be Re-Used)

SYSTEM TYPE
Single-Ply to the Existing Insulation (Insulation to be Re-Used

SYSTEM TYPE
Ballasted Single-Ply to the Existing Insulation (Insulation to be Re-Used

SYSTEM TYPE
Add to save good Concrete Tile Shingles for reuse

SYSTEM TYPE
Add to save good Slate Tile Shingles for reuse

SYSTEM TYPE
Add to save good Cedar / Wood Shake Shingles for reuse

SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Metal Deck

SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Wood / Tectum Deck

SYSTEM TYPE
Polyurethane Foam (PUF) Roof (Average of 2" thick) W/ Underlying Insulation and UV-Resistant Coating - Lightweight / Gyp Deck

DECK TYPE
Spot Concrete Deck Replacement (Multiple areas under 1 square)

DECK TYPE
Spot Lightweight Deck Replacement (Multiple areas under 1 square)

DECK TYPE
Spot Tectum Deck Replacement (Multiple areas under 1 square)

DECK TYPE
Large Areas of Metal Deck Replacement (Replacement areas averaging greater than 1 square)

DECK TYPE
Large Areas of Wood Deck Replacement (Replacement areas averaging greater than 1 square)

DECK TYPE
Large Areas of Gypsum Deck Replacement (Replacement areas averaging greater than 1 square)

SYSTEM TYPE
Coal Tar BUR with Gravel Surfacing to the Existing Insulation (Insulation to be Re-Used)

SYSTEM TYPE
Coal Tar BUR with Mineral Surfacing to the Existing Insulation (Insulation to be Re-Used)

MULTIPLIER - TEAR-OFF & DISPOSE OF DEBRIS
Each Additional Roof System

DECK TYPE
Spot Metal Deck Replacement (Multiple areas under 1 square)

DECK TYPE
Spot Wood Deck Replacement (Multiple areas under 1 square)

DECK TYPE
Spot Gypsum Deck Replacement (Multiple areas under 1 square)

DECK TYPE
Large Areas of Concrete Deck Replacement (Replacement areas averaging greater than 1 square)

DECK TYPE
Large Areas of Lightweight Deck Replacement (Replacement areas averaging greater than 1 square)

Page 4 of 50 ends

Addendum 1 - Pa Page 631ge 20 of 66

3.12 SF

4.00 Insulation Recovery Board & Insulations Options

4.01 SF

4.02 SF

4.03 SF

4.04 SF

4.05 SF

4.06 SF

4.07 SF

4.08 SF

4.09 SF

4.10 SF

4.11 SF

4.12 SF

4.13 SF

4.14 SF

4.15 SF

4.16 SF

4.17 SF

4.18 SF

RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Wood / Tectum Deck

RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Lightweight / Gypsum Deck

RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Concrete Deck

RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Adhered in Hot ASTM D 312 Type III or IV Asphalt; Mopped

RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Adhered with Insulation Adhesive

RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Metal Deck

DECK TYPE
Large Areas of Tectum Deck Replacement (Replacement areas averaging greater than 1 square)

RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Adhered in Hot ASTM D 312 Type III or IV Asphalt; Mopped

RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Adhered with Insulation Adhesive

RECOVERY BOARD TYPE
1/2" Wood Fiber or Perlite Board Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Metal Deck

ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 2.5" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation

ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Add for Cutting New Insulation to Match the Profile of an Existing Metal Roof.

INSULATION SUBSTITUTION OPTION
Deduct for Providing an R-Value of greater than or equal to 10, but less than 15; instead of the Standard R-Value of 20 (Should be Negatively Priced) - All Applications Other Than Metal Roof Systems

RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Wood / Tectum Deck

RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Lightweight / Gypsum Deck

RECOVERY BOARD TYPE
1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) Installed Over an Existing Roof Mechanically Fastened to Roof Deck - Concrete Deck

ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 1.0" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation

ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 1.5" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation

ADDITIONAL INSULATION OPTION (OVER AN EXISTING ROOF)
Install 2.0" of Polyisocyanurate Insulation Over an Existing Roof. All Wet Insulation Must be Replaced Prior to Installation of New Course of Insulation

Page 5 of 50 ends

Addendum 1 - Pa Page 632ge 21 of 66

4.19 SF

4.20 SF

4.21 SF

4.22 SF

4.23 SF

4.24 SF

4.25 SF

4.26 SF

4.27 SF

4.28 SF

4.29 SF

4.30 SF

4.31 SF

4.32 SF

5.00 Coat New Roofing With Elastomeric Coating

5.01 SF

5.02 SF

5.03 SF

5.04 SF

5.05 SF

INSULATION SUBSTITUTION OPTION
Deduct for Providing an R-Value of greater than or equal to 15, but less than 18; instead of the Standard R-Value of 20 (Should be Negatively Priced) - All Applications Other Than Metal Roof Systems INSULATION SUBSTITUTION OPTION:

Deduct for Providing an R-Value of greater than or equal to 18, but less than 20 instead of the Standard R-Value of 20 (Should be Negatively Priced) - All Applications Other Than Metal Roof Systems INSULATION SUBSTITUTION OPTION:

Add for Providing an R-Value of 25 Instead of the Standard R-Value of 20 - All Applications Other Than Metal Roof Systems

INSULATION SLOPE OPTION
Provide a 1/8" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value; Adhered with Insulation Adhesive

INSULATION SUBSTITUTION OPTION
Provide a 1/4" Tapered Insulating Lightweight Concrete System while Maintaining Average R-Value

INSULATION SUBSTITUTION OPTION
Provide a 1/8" Tapered Insulating Lightweight Concrete System while Maintaining Average R-Value INSULATION ATTACHMENT OPTION:

Provide Attachment Pattern in Compliance with FM 1-60 Wind Uplift Instead of FM 1-90 INSULATION ATTACHMENT OPTION:

Provide Attachment Pattern in Compliance with FM 1-120 Wind Uplift Instead of FM 1-90

ROOF SYSTEM TYPE
Apply an Acrylic Coating per Specifications (1.5 Gallons per Square per Coat - 2 Coats Required) - Mineral-Surfaced Modified Roof
INSULATION SUBSTITUTION OPTION:

Add for Providing an R-Value of 30 Instead of the Standard R-Value of 20 - All Applications Other Than Metal Roof Systems

INSULATION SUBSTITUTION OPTION
Substitute 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) in Place of the Wood Fiber or Perlite - Adhered in Hot ASTM D 312 Type III or IV Asphalt; Mopped

INSULATION SUBSTITUTION OPTION
Substitute 1/2" Treated Gypsum Insulation Board with Glass-Mat (e.g. DensDeck / Securock / Equal) in Place of the Wood Fiber or Perlite - Adhered with Insulation Adhesive

INSULATION SLOPE OPTION
Provide a 1/4" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value Including Tapered Crickets; Adhered in ASTM D 312 Type III or IV Hot Asphalt; Mopped

INSULATION SLOPE OPTION
Provide a 1/8" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value; Adhered in ASTM D 312 Type III or IV Hot Asphalt; Mopped

INSULATION SLOPE OPTION
Provide a 1/4" Tapered Polyisocyanurate Insulation System while Maintaining the Average R-Value Including Tapered Crickets; Adhered with Insulation Adhesive

ROOF SYSTEM TYPE
Apply an Acrylic Coating per Specifications (1.0 Gallon per Square per Coat - 2 Coats Required) - Smooth-Surfaced Modified Roof

ROOF SYSTEM TYPE
Apply a bright white, water-based, acrylic-urethane hybrid roof coating per Specifications (1.5 Gallons per Square per Coat - 2 Coats Required) - Mineral-Surfaced Modified Roof

ROOF SYSTEM TYPE
Apply a bright white, water-based, acrylic-urethane hybrid roof coating per Specifications (1.0 Gallon per Square per Coat - 2 Coats Required) - Smooth-Surfaced Modified Roof

ROOF SYSTEM TYPE
Apply an Acrylic base coat and a PVDF top coat per Specifications (1.5 Gallons per Square Base Coat - 1/2 Gallon per Square Top Coat) - Mineral-Surfaced Modified Roof

Page 6 of 50 ends

Addendum 1 - Pa Page 633ge 22 of 66

5.06 SF

5.07 SF

5.08 SF

5.09 SF

5.10 SF

5.11 SF

6.00 Roof Deck and Insulation Option

6.01 6.01.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Hot Mop Wood Fiber or Perlite to Provide
an Average R-Value of 20
In Compliance with FM 1-90
Requirements SF

6.02 6.02.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Hot Mop Wood Fiber or Perlite to Provide
an Average R-Value of 20 SF

6.02.02 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

6.03 6.03.01 INSULATION OPTION:

Mechanically Attach Base Sheet Utilizing
FM 1-90 Attachment Patterns & Hot Mop
Polyisocyanurate / Hot Mop Wood Fiber
or Perlite to Provide an Average R-Value
of 20 SF

6.03.02 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

6.04 6.04.01 INSULATION OPTION:

Must Mechanically Attach a Base Sheet;
Hot Mop Polyisocyanurate / Hot Mop
Wood Fiber or Perlite to Provide an
Average R-Value of 20
In Compliance FM 1-90 Requirements SF

6.04.02 INSULATION OPTION:

Without Insulation - Must at Least
Mechanically Fasten a Base Sheet to the
Roof Deck Prior to Installation
Installed with FM 1-90 Attachment
Patterns SF

6.05 6.05.01 INSULATION OPTION:

Prime Roof Deck; Hot Mop
Polyisocyanurate / Hot Mop Wood Fiber
or Perlite to Provide an Average R-Value
of 20
In Compliance FM 1-90 Requirements SF

ROOF SYSTEM TYPE
Apply a single-component, aliphatic, polyurea liquid adhesive per Specifications (Apply 1.0 gallon per Square on Seams & wait 24 Hours / Apply base coat at 1.0 gallon per Square / broadcast mineral at 35 lbs. per Square or white gravel at 200 lbs. per Square / wait 24 hours and apply top coat at 1.0 gallon per Square - Mineral-Surfaced Modified

ROOF SYSTEM TYPE
Apply a single-component, aliphatic, polyurea liquid adhesive per Specifications (apply base coat at 1.0 gallon per Square / broadcast mineral at 35 lbs. per Square or white gravel at 200 lbs. per Square / wait 24 hours and apply top coat at 1.0 gallon per Square - Smooth-Surfaced Modified

ROOF SYSTEM TYPE
Apply an Aluminum Coating per Specifications (3/4 Gallon per Square per Coat - 2 Coats Required) - Smooth or Mineral Surfaced Modified

ROOF SYSTEM TYPE
Apply a Fibered Aluminum Coating per Specifications (2 Gallons per Square per Coat - 1 Coat Required) - Smooth or Mineral Surfaced Modified
METAL ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT WOOD ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT

ROOF SYSTEM TYPE
Apply an Acrylic base coat and a PVDF top coat per Specifications (1 Gallon per Square Base Coat - 1/2 Gallon per Square Top Coat) -Smooth-Surfaced Modified Roof

ROOF SYSTEM TYPE
Apply an Urethane Coating per Specifications (1 Gallon per Square per Coat - 2 Coats Required) - Smooth or Mineral Surfaced Modified; With Reinforced Seams (Base Coat Seam with 1.5 Gallons per Square & Reinforcement) TECTUM ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT LIGHTWEIGHT CONCRETE / GYPSUM ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT CONCRETE ROOF DECK - HOT APPLICATION - ASTM D 312 TYPE III OR IV ASPHALT

Page 7 of 50 ends

Addendum 1 - Pa Page 634ge 23 of 66

6.05.02 INSULATION OPTION:

Without Insulation - Prime Roof Deck;
Must at Least 1/2" Wood Fiber or Perlite
Hot Mopped to Deck
In Compliance FM 1-90 Requirements SF

6.06 METAL ROOF DECK - COLD PROCESS APPLICATION

6.06.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Adhere High Density Asphalt Coated
Wood Fiber with Insulation Adhesive to
Provide an Average R-Value of 20
In Compliance FM 1-90 Requirements SF

6.07 WOOD ROOF DECK - COLD PROCESS APPLICATION

6.07.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Adhere High Density Asphalt Coated
Wood Fiber with Insulation Adhesive to
Provide an Average R-Value of 20 SF

6.07.02 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

6.08 TECTUM ROOF DECK - COLD PROCESS APPLICATION

6.08.01 INSULATION OPTION:

Mechanically Attach Base Sheet &
Adhere Polyisocyanurate in Insulation
Adhesive / Adhere High Density Asphalt
Coated Wood Fiber with Insulation
Adhesive to Provide an Average R-Value
of 20 SF

6.08.02 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

6.09 6.09.01 INSULATION OPTION:

Must Mechanically Attach a Base Sheet;
Adhere Polyisocyanurate in Insulation
Adhesive / Adhere High Density Asphalt
Coated Wood Fiber with Insulation
Adhesive to Provide an Average R-Value
of 20
In Compliance FM 1-90 Requirements SF

6.09.02 INSULATION OPTION:

Without Insulation - Must at Least
Mechanically Fasten a Base Sheet to the
Roof Deck
Installed with FM 1-90 Attachment
Patterns SF

6.10 CONCRETE ROOF DECK - COLD PROCESS APPLICATION

6.10.01 INSULATION OPTION:

Adhere Polyisocyanurate in Insulation
Adhesive / Adhere High Density Asphalt
Coated Wood Fiber with Insulation
Adhesive to Provide an Average R-Value
of 20
In Compliance FM 1-90 Requirements SF

6.10.02 INSULATION OPTION:

Without Insulation - Must at Least 1/2"
High Density Asphalt Coated Wood Fiber
Adhered with Insulation Adhesive to Deck
In Compliance FM 1-90 Requirements SF

6.11 METAL ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION

6.11.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Adhere Treated Gypsum Insulation Board
with Glass-Mat (e.g. DensDeck /
Securock / Equal) with Insulation
Adhesive to Provide an Average R-Value
of 20
In Compliance FM 1-90 Requirements SF

6.12 WOOD ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION

LIGHTWEIGHT CONCRETE / GYPSUM ROOF DECK - COLD PROCESS APPLICATION

Page 8 of 50 ends

Addendum 1 - Pa Page 635ge 24 of 66

6.12.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Adhere Treated Gypsum Insulation Board
with Glass-Mat (e.g. DensDeck /
Securock / Equal) with Insulation
Adhesive to Provide an Average R-Value
of 20 SF

6.12.02 INSULATION OPTION:

Without Insulation - Must Mechanically
Attach 1/2" Treated Gypsum Insulation
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal) SF

6.13 6.13.01 INSULATION OPTION:

Mechanically Attach Base Sheet &
Adhere Polyisocyanurate in Insulation
Adhesive / Adhere Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) with
Insulation Adhesive to Provide an
Average R-Value of 20 SF

6.13.02 INSULATION OPTION:

Without Insulation - Must Mechanically
Attach 1/2" Treated Gypsum Insulation
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal) SF

6.14 6.14.01 INSULATION OPTION:

Must Mechanically Attach a Base Sheet;
Adhere Polyisocyanurate in Insulation
Adhesive / Adhere Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) with
Insulation Adhesive to Provide an
Average R-Value of 20
In Compliance FM 1-90 Requirements SF

6.14.02 INSULATION OPTION:

Without Insulation - Must at Least
Mechanically Fasten a Base Sheet to the
Roof Deck Prior to Installation
Installed with FM 1-90 Attachment
Patterns SF

6.15 6.15.01 INSULATION OPTION:

Adhere Polyisocyanurate in Insulation
Adhesive / Adhere Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) with
Insulation Adhesive to Provide an
Average R-Value of 20
In Compliance FM 1-90 Requirements SF

6.15.02 INSULATION OPTION:

Without Insulation - Must Adhere 1/2"
Treated Gypsum Insulation Board with
Glass-Mat (e.g. DensDeck / Securock /
Equal) in Insulation Adhesive
In Compliance FM 1-90 Requirements SF

6.16 6.16.01 VAPOR BARRIER OPTION:

HOT ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:

Mechanically-Fasten Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal), Apply 2
Plies of Glass Felt in Hot ASTM D 312
Type III OR IV Asphalt
In Compliance with FM 1-90
Requirements SF

CONCRETE ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION INSTALL PRIOR TO ROOF SYSTEM INSULATION:

TECTUM ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION

LIGHTWEIGHT CONCRETE / GYPSUM ROOF DECK - TORCH APPLIED / SELF-ADHERING APPLICATION

Page 9 of 50 ends

Addendum 1 - Pa Page 636ge 25 of 66

6.16.02 VAPOR BARRIER OPTION:

HOT ASPHALT-APPLIED VAPOR

BARRIER ON WOOD, TECTUM,

LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten
Glass Base Sheet, Apply 2 Plies of Glass
Felt in Hot ASTM D 312 Type III OR IV
Asphalt
In Compliance with FM 1-90
Requirements SF

6.16.03 VAPOR BARRIER OPTION:

HOT ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:

Prime Deck Prior to Applying 2 Plies of
Glass Felt in Hot ASTM D 312 Type III
OR IV Asphalt SF

6.16.04 VAPOR BARRIER OPTION:

COLD ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:

Mechanically-Fasten Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal); Apply 2
Plies of Glass Base in Cold Process
Modified Asphalt
In Compliance with FM 1-90
Requirements SF

6.16.05 VAPOR BARRIER OPTION:

COLD ASPHALT-APPLIED VAPOR

BARRIER ON WOOD, TECTUM,

LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten
Glass Base Sheet, Apply 2 Plies of Glass
Base in Cold Process Modified Asphalt
In Compliance with FM 1-90
Requirements SF

6.16.06 VAPOR BARRIER OPTION:

COLD ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:

Prime Deck Prior to Applying 2 Plies of
Glass Base in Cold Process Modified
Asphalt SF

6.16.07 VAPOR BARRIER OPTION:

TORCH-APPLIED VAPOR BARRIER
ON METAL DECK:

Mechanically-Fasten Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal); Heat
Weld with Torch 1 Ply of SBS Modified
Asphalt-Based, Fiberglass Reinforced
Torch Base Sheet - Minimum of 80 lbf/in
tensile Torch-Applied Base Sheet (ASTM
D 5147)
In Compliance with FM 1-90
Requirements SF

6.16.08 VAPOR BARRIER OPTION:

TORCH-APPLIED VAPOR BARRIER

ON WOOD, TECTUM, LIGHTWEIHT
CONCRETE OR GYPSUM DECK:

Mechanically Fasten Glass Base Sheet,
Heat Weld with Torch 1 Ply of SBS
Modified Asphalt-Based, Fiberglass
Reinforced Torch Base Sheet - Minimum
of 80 lbf/in tensile Torch-Applied Base
Sheet (ASTM D 5147)
In Compliance with FM 1-90
Requirements SF

Page 10 of 50 ends

Addendum 1 - Pa Page 637ge 26 of 66

6.16.09 VAPOR BARRIER OPTION:

TORCH-APPLIED VAPOR BARRIER
ON CONCRETE DECK:

Prime Deck Prior to Heat Welding with
Torch 1 Ply of SBS Modified AsphaltBased, Fiberglass Reinforced Torch Base Sheet - Minimum of 80 lbf/in tensile
Torch-Applied Base Sheet (ASTM D
5147) SF

6.16.10 VAPOR BARRIER OPTION:

HOT ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:

Mechanically-Fasten Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal), ASTM D
6163 SBS Fiberglass Reinforced
Modified Bituminous Sheet Material Type
I - 70 lbf/in tensile in Hot ASTM D 312
Type III OR IV Asphalt
In Compliance with FM 1-90
Requirements SF

6.16.11 VAPOR BARRIER OPTION:

HOT ASPHALT-APPLIED VAPOR

BARRIER ON WOOD, TECTUM,

LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten
Glass Base Sheet, ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type I - 70
lbf/in tensile in Hot ASTM D 312 Type III
OR IV Asphalt
In Compliance with FM 1-90
Requirements SF

6.16.12 VAPOR BARRIER OPTION:

HOT ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:

Prime Deck Prior to ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type I - 70
lbf/in tensile in Hot ASTM D 312 Type III
OR IV Asphalt SF

6.16.13 VAPOR BARRIER OPTION:

COLD ASPHALT-APPLIED VAPOR
BARRIER ON METAL DECK:

Mechanically-Fasten Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal); ASTM D
6163 SBS Fiberglass Reinforced
Modified Bituminous Sheet Material Type
I - 70 lbf/in tensile in Cold Process
Modified Asphalt
In Compliance with FM 1-90
Requirements SF

6.16.14 VAPOR BARRIER OPTION:

COLD ASPHALT-APPLIED VAPOR

BARRIER ON WOOD, TECTUM,

LIGHTWEIHT CONCRETE OR
GYPSUM DECK: Mechanically Fasten
Glass Base Sheet, ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type I - 70
lbf/in tensile in Cold Process Modified
Asphalt
In Compliance with FM 1-90
Requirements SF

Page 11 of 50 ends

Addendum 1 - Pa Page 638ge 27 of 66

6.16.15 VAPOR BARRIER OPTION:

COLD ASPHALT-APPLIED VAPOR
BARRIER ON CONCRETE DECK:

Prime Deck Prior to ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type I - 70
lbf/in tensile in Cold Process Modified
Asphalt SF

7.00 BUILT-UP MODIFIED ROOF WITH FLOOD COAT AND AGGREGATE IN HOT ASTM D 312 TYPE III OR IV ASPHALT

7.01 7.01.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

7.01.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

7.01.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

7.01.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

7.01.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

7.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 7.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

7.03 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

7.04 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

7.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

7.06 DEDUCT TO SQUARE FOOT COST - Hot Applied Modified BUR Substitute Additional Glass Felt (Hot Applications) in Place of ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile (i.e. 3 Ply BUR) SF

7.07 ADD TO PER SQUARE FOOT COST - Hot Applied Modified BUR Each Additional Glass Felt (Hot Applications) Inter-ply Installed SF

8.00 BUILT-UP MODIFIED ROOF WITH FLOOD COAT AND AGGREGATE IN

COLD PROCESS ASPHALT

8.01 8.01.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

8.01.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

ROOF CONFIGURATION
2 Plies of Glass Felt, Cap Sheet, Flood Coat and Aggregate All in Hot ASTM D 312 Type III OR IV Asphalt

ROOF CONFIGURATION
2 Plies of Glass Base, Cap Sheet, Flood Coat and Aggregate All in Cold Process Modified Asphalt

Page 12 of 50 ends

Addendum 1 - Pa Page 639ge 28 of 66

8.01.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

8.01.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

8.01.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

8.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 8.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

8.03 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

8.04 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

8.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

8.06 DEDUCT TO SQUARE FOOT COST - Cold Applied Modified BUR Substitute Additional Glass Base Sheet in Place of ASTM D 6163 SBS Fiberglass Reinforced Modified Bituminous Sheet Material Type I - Minimum of 70 lbf/in tensile (i.e. 3 Ply BUR) SF

8.07 ADD TO PER SQUARE FOOT COST - Cold Applied Modified BUR Each Additional Glass Base (Cold Applications) Inter-ply Installed SF

9.00 BUILT-UP MODIFIED ROOF ADHERED IN HOT ASTM D 312 TYPE III OR IV

ASPHALT - FLOOD COAT & AGGREGATE IN MODIFIED COAL TAR PITCH

9.01 9.01.01 ROOFING MEMBRANE & COATING OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

9.01.02 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

9.01.03 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

9.01.04 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

ROOF CONFIGURATION
2 ply of Glass Felt, Cap Sheet, Set in Hot Asphalt, Flood Coat in Modified Coal Tar Pitch and Aggregate

Page 13 of 50 ends

Addendum 1 - Pa Page 640ge 29 of 66

9.01.05 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - 600 lbf/in tensile, Flood
Coat in Modified Hot Coal Tar Pitch With
2000% Elongation SF

9.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 9.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

9.03 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

9.04 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

9.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

9.06 COATING OPTION:

Add/Deduct for Installing Flood Coat in
Cold Process Coal Tar Pitch SF

10.00 BUILT-UP MODIFIED ROOF WITH MINERAL CAP SHEET ADHERED IN HOT ASTM D 312 TYPE III OR IV ASPHALT

10.01 10.01.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

10.01.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

10.01.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

10.01.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

10.01.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

10.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 10.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

10.03 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

10.04 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

10.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

11.00 BUILT-UP MODIFIED ROOF WITH MINERAL CAP SHEET ADHERED IN

COLD PROCESS ASPHALT

11.01 ROOF CONFIGURATION
2 ply of Glass Felt, Mineral Surfaced Cap Sheet, Set in Hot ASTM D 312 Type III or IV Asphalt

ROOF CONFIGURATION
2 ply Glass Base, Mineral Cap Sheet, Set in Cold Process Modified Asphalt

Page 14 of 50 ends

Addendum 1 - Pa Page 641ge 30 of 66

11.01.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

11.01.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

11.01.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

11.01.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

11.01.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

11.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 11.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

11.03 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

11.04 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

11.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.00 2-PLY ROOF SYSTEMS - COMBINATIONS OF A BASE PLY & A CAP

SHEET (TOP PLY)
PLEASE NOTE: BASE PLY & CAP SHEET COMBINATIONS MUST BE

APPROVED BY THE MANUFACTURER

12.01 12.01.01 BASE PLY OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - 70 lbf/in tensile SF

12.01.02 BASE PLY OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - 220 lbf/in tensile SF

12.01.03 BASE PLY OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - 310 lbf/in tensile SF

12.01.04 SF

12.02 12.02.01 BASE PLY OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - 70 lbf/in tensile SF

12.02.02 BASE PLY OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - 220 lbf/in tensile SF

12.02.03 BASE PLY OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - 310 lbf/in tensile SF

ROOF CONFIGURATION
1 Ply Modified Base Sheet Adhered in Hot ASTM D 312 Type III or IV Asphalt ADD/DEDUCT TO PER SQUARE FOOT COST - Hot Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Hot Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e.

12.01.02 + 12.01.02 + 12.01.04 = Two Plies Installed)

ROOF CONFIGURATION
1 Ply Modified Base Sheet Adhered in Cold Process Modified Asphalt

Page 15 of 50 ends

Addendum 1 - Pa Page 642ge 31 of 66

12.02.04 SF

12.02.05 INTERPLY ADHESIVE OPTION:

Add/Deduct for Cold Applied Modified
Multi-ply Systems
Substitute Cold Process Adhesive with
Alternative Solvent Free Adhesive SF

12.03 12.03.01 BASE PLY OPTION:

SBS Modified Asphalt-Based, Fiberglass
Reinforced Torch Base Sheet - Minimum
of 80 lbf/in tensile Torch-Applied Base
Sheet (ASTM D 5147) SF

12.03.02 BASE PLY OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - 210 lbf/in tensile SF

12.03.03 SF

12.04 12.04.01 BASE PLY OPTION:

SBS Modified Asphalt-Based, Polyester
OR Fiberglass/Polyester OR Fiberglass
Reinforced Self-Adhering Base Sheet -
Minimum of 50 lbf/in tensile SF

12.04.02 SF

12.05 12.05.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

12.05.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

12.05.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

12.05.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III – Minimum of 500 lbf/in
tensile SF

12.05.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III – Minimum of 600 lbf/in
tensile SF

12.05.06 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.05
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.05.07 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF
ADD/DEDUCT TO PER SQUARE FOOT COST - Torch-Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Torch-Applied Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e. 12.03.02 + 12.03.02 + 12.03.03 = Two Plies Installed)

ROOF CONFIGURATION
1 Ply of Self-Adhering Base Installed Using Self-Adhering Backing ADD/DEDUCT TO PER SQUARE FOOT COST - Torch-Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Torch-Applied Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e. 12.04.01 + 12.04.01 + 12.04.02 = Two Plies Installed)

ROOF CONFIGURATION
1 Ply Cap Sheet, Flood Coat and Aggregate Adhered in Hot ASTM D 312 Type III OR IV Asphalt ADD/DEDUCT TO PER SQUARE FOOT COST - Cold Applied Modified Multi-ply Systems Each Additional Modified Base Sheet (All Cold Applications) Installed. To be combined with line items above for a labor cost reduction to installed price of two plies of the same modified base sheet vs. the installation of a single base sheet (i.e.

12.02.02 + 12.02.02 + 12.02.04 = Two Plies Installed)

ROOF CONFIGURATION
1 Ply of Torch Base Sheet Installed with Torch Application

Page 16 of 50 ends

Addendum 1 - Pa Page 643ge 32 of 66

12.05.08 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.05.09 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.06 12.06.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

12.06.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

12.06.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

12.06.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

12.06.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

12.06.06 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.06
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.06.07 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.06.08 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.06.09 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.07 12.07.01 ROOFING MEMBRANE & COATING OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

12.07.02 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

12.07.03 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

ROOF CONFIGURATION
1 Ply Mineral Surfaced Cap Sheet Adhered in Hot ASTM D 312 Type III or IV Asphalt

ROOF CONFIGURATION
1 Ply Cap Sheet, Set in Hot ASTM D 312 Type III or IV Asphalt, Flood Coat & Aggregate in Hot Modified Coal Tar Pitch

Page 17 of 50 ends

Addendum 1 - Pa Page 644ge 33 of 66

12.07.04 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

12.07.05 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum 600 lbf/in
tensile, Flood Coat in Modified Hot Coal
Tar Pitch With 2000% Elongation SF

12.07.06 COATING OPTION:

Add/Deduct for Installing Flood Coat in
Cold Process Coal Tar Pitch SF

12.07.07 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.07
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.07.08 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.07.09 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.07.10 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.08 12.08.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

12.08.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

12.08.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

12.08.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

12.08.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

12.08.06 MEMBRANE ADHESIVE & COATING OPTION:

Add/Deduct for Cold Applied Modified
BUR
Substitute Cold Process Adhesive with
Alternative Solvent Free Adhesive SF

12.08.07 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.08
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.08.08 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

ROOF CONFIGURATION
1 Ply Cap Sheet, Flood Coat and Aggregate Adhered in Cold Process Modified Asphalt

Page 18 of 50 ends

Addendum 1 - Pa Page 645ge 34 of 66

12.08.09 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.08.10 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.09 12.09.01 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

12.09.02 ROOFING MEMBRANE OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

12.09.03 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

12.09.04 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

12.09.05 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 600 lbf/in
tensile SF

12.09.06 MEMBRANE ADHESIVE OPTION:

Add/Deduct for Cold Applied Modified
BUR
Substitute Cold Process Adhesive with
Alternative Solvent Free Adhesive SF

12.09.07 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.09
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.09.08 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.09.09 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.09.10 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.10 12.10.01 ROOFING MEMBRANE & COATING OPTION:

ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type I - Minimum of 70 lbf/in
tensile SF

12.10.02 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 220 lbf/in
tensile SF

12.10.03 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 310 lbf/in
tensile SF

12.10.04 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 500 lbf/in
tensile SF

ROOF CONFIGURATION
1 Ply Mineral Surfaced Cap Sheet Adhered in Cold Process Modified Asphalt

ROOF CONFIGURATION
1 Ply Cap Sheet, Set in Cold Process Asphalt, Flood Coat & Aggregate in Cold Applied Modified Coal Tar Pitch and Aggregate

Page 19 of 50 ends

Addendum 1 - Pa Page 646ge 35 of 66

12.10.05 ROOFING MEMBRANE & COATING OPTION
ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum 600 lbf/in
tensile SF

12.10.06 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.10
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.10.07 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.10.08 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.10.09 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.11 12.11.01 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum 300 lbf/in
tensile Torch-Applied Membrane SF

12.11.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.11
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.11.03 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.11.04 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.11.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.12 12.12.01 ROOFING MEMBRANE OPTION:

ASTM D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - Minimum of 300 lbf/in
tensile Torch-Applied Membrane SF

12.12.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.12
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.12.03 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

12.12.04 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

12.12.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.13 ROOF CONFIGURATION
1 Ply of Mineral Surfaced, Torch-Applied Cap Sheet Installed with Torch Application

ROOF CONFIGURATION
1 Ply of Torch-Applied Cap Sheet Installed with Torch Application and Finished with a Flood Coat & Aggregate in Cold Process Modified Asphalt

ROOF CONFIGURATION
1 Ply of Mineral Surfaced, Self-Adhering Cap Sheet Installed Using Self-Adhering Backing

Page 20 of 50 ends

Addendum 1 - Pa Page 647ge 36 of 66

12.13.01 ROOF CONFIGURATION OPTION:

ASTM D 6161 (Polyester) OR 6162
(Fiberglass/Polyester) OR 6163
(Fiberglass) Self-Adhering Reinforced
Modified Bituminous Sheet Material Type
III - Minimum of 130 lbf/in tensile SF

12.13.02 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.13
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.13.03 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.13.04 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.13.05 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.14 12,14.01 POLYMERIC TOP PLY OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 50 Mil Thickness SF

12.14.02 POLYMERIC TOP PLY OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 60 Mil Thickness SF

12.14.03 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.14
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.14.04 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.14.05 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

12.14.06 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

12.15 12.15.01 POLYMERIC TOP PLY OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 50 Mil Thickness SF

12.15.02 POLYMERIC TOP PLY OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 60 Mil Thickness SF

12.15.03 MEMBRANE ADHESIVE OPTION:

Add/Deduct for Cold Applied FleeceBack Polymeric Cap Sheet (Top Ply) Substitute Membrane Adhesive with Cold
Applied Asphalt Adhesive SF

12.15.04 MEMBRANE ADHESIVE OPTION:

PER SQUARE FOOT COST - Cold
Applied Fleece-Back Polymeric Cap
Sheet (Top Ply)
Substitute Membrane Adhesive with
Solvent-Free Asphalt Adhesive SF

12.15.05 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 12.15
Must includes coverage for roof uplift
pressures up to 90 MPH SF

12.15.06 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

12.15.08 WARRANTY UPCHARGE:

Labor & Material Warranty with No Dollar
Limitations SF

ROOF CONFIGURATION
1 Ply Fleece-Back Polymeric Cap Sheet (Top Ply) Adhered in Hot ASTM D 312 Type III OR IV Asphalt with Heat Welded Seams

ROOF CONFIGURATION
1 Ply Fleece-Back Polymeric Cap Sheet (Top Ply) Adhered in Membrane Adhesive with Heat Weld Seams

Page 21 of 50 ends

Addendum 1 - Pa Page 648ge 37 of 66

12.15.09 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

13.00 BUILT-UP COAL TAR ROOF WITH FLOOD COAT AND AGGREGATE IN

MODIFIED HOT COAL TAR PITCH

13.01 13.01.01 ROOF CONFIGURATION OPTION:
4-Ply ASTM D 4990 Type I Coal Tar
Saturated Felts in Modified Coal Tar
Pitch; Modified CTP with 2000%
Elongation SF

13.01.02 ROOF CONFIGURATION OPTION:
3-Ply Continuous Filament Polyester Mat
(5.0 oz./yd2) in Modified Coal Tar Pitch;
Modified CTP with 2000% Elongation SF

13.02 INTERPLY ADHESIVE & FLOOD COAT OPTION:

PER SQUARE FOOT COST -

SUBSTITUTE STANDARD COAL TAR
PITCH
Add/Deduct for Using Standard Coal Tar
Pitch Instead of Modified Coal Tar Pitch SF

13.03 FLOOD COAT OPTION:

PER SQUARE FOOT COST -
SUBSTITUTE COLD PROCESS+

MODIFIED COAL TAR PITCH FOR

FLOOD COAT
Add/Deduct for Using Cold Process
Modified Coal Tar Pitch for Flood Coat
Instead of Hot Modified Coal Tar
Pitch+B222 SF

13.04 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 13.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

13.05 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

13.06 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

13.07 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

14.00 METAL ROOFING SYSTEMS - LOW SLOPE & STEEP SLOPE (2)

14.01 14.01.01 INSULATION OPTION:

Architectural Application -
No Insulation; 30 lbs. Felt Underlayment
Over Deck SF

14.01.02 INSULATION OPTION:

Architectural Application -
No Insulation - WOOD DECK: Class A
Fire-Retardant Underlayment SF

14.01.03 INSULATION OPTION:

Architectural Application -
Minimal Insulation - WOOD OR METAL
DECK: Must Have 1/2" Treated Gypsum
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal); & 40 mil Self-Adhering
Underlayment SF

14.01.04 INSULATION OPTION:

Architectural Application -
Mechanically Fasten Polyisocyanurate to
Provide an Average R-Value of 20; with
40 mil Self-Adhering Underlayment SF

ROOF CONFIGURATION
1 Ply of Glass Base, 3 Plies of Polyester Mat or 4 ply of Coal Tar Felts in Modified Hot Coal Tar Pitch (CTP), [Insulation & Glass Base] Set in Hot ASTM D 312 Type III or IV Asphalt

INSULATION OPTIONS FOR ARCHITECTURAL STANDING SEAM ROOF INSTALLATION OVER SUBSTRATE

Page 22 of 50 ends

Addendum 1 - Pa Page 649ge 38 of 66

14.01.05 INSULATION OPTION:

Structural Application Over Open
Framing; Over Retrofit Framing; Over an
Existing Roof Using Steel Furring -
No Insulation SF

14.01.06 INSULATION OPTION:

Structural Application Over Open
Framing or Over Retrofit Framing -
Fiberglass Batten Insulation with an RValue of 30 SF

14.01.07 INSULATION OPTION:

Structural Application Over Retrofit
Framing -
Loose Laid Fiberglass Blanket on
Existing Deck with an R-Value of 30 SF

14.01.08 INSULATION OPTION:

Structural Application Over an Existing
Roof Using Steel Furring -
Fiberglass Batten Insulation with an RValue of 20 SF

14.01.09 INSULATION OPTION:

Structural Application Over an Existing
Roof Using Steel Furring -
Mechanically Fastened Polyisocyanurate
on Existing Roof with an R-Value of 20 SF

14.02 14.02.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum, 18" - 19" Wide Panels SF

14.02.02 THICKNESS OPTION:

Add for Bare Aluminum 0.040" Aluminum
, 18" - 19" Wide Panels SF

14.02.03 PANEL WIDTH OPTION: Add for 12" - 13" Panel Width - Aluminum SF

14.02.04 PANEL WIDTH OPTION: Add for 16" - 17" Panel Width - Aluminum SF

14.02.05 PANEL WIDTH OPTION: Add for 24" - 25" Panel Width - Aluminum SF

14.02.06 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga, 18" - 19" Wide
Panels SF

14.02.07 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga, 18" - 19" Wide
Panels SF

14.02.08 PANEL WIDTH OPTION:

Add for 12" - 13" Panel Width -
Galvalume Coated Steel or Equal SF

14.02.09 PANEL WIDTH OPTION:

Add for 16" - 17" Panel Width -
Galvalume Coated Steel or Equal SF

14.02.10 PANEL WIDTH OPTION:

Add for 24" - 25" Panel Width -
Galvalume Coated Steel or Equal SF

14.02.11 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

14.02.12 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

14.02.13 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

14.02.14 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga , 18" - 19" Wide
Panels SF

14.02.15 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga, 18" - 19" Wide
Panels SF

ROOF CONFIGURATION
Architectural or Structural Standing Seam Roof System; Seam Height At or Above 2"

Page 23 of 50 ends

Addendum 1 - Pa Page 650ge 39 of 66

14.02.16 PANEL WIDTH OPTION:

Add for 12" - 13" Panel Width - Stainless
Steel SF

14.02.17 PANEL WIDTH OPTION:

Add for 16" - 17" Panel Width - Stainless
Steel SF

14.02.18 PANEL WIDTH OPTION:

Add for 24" - 25" Panel Width - Stainless
Steel SF

14.02.19 THICKNESS OPTION:

Copper
Panel Price - 16 oz,18" - 19" Wide Panels SF

14.02.20 THICKNESS OPTION:

Copper
Panel Price - 20 Oz, 18" - 19" Wide
Panels SF

14.02.21 PANEL WIDTH OPTION: Add for 12" - 13" Panel Width - Copper SF

14.02.22 PANEL WIDTH OPTION: Add for 16" - 17" Panel Width - Copper SF

14.02.23 PANEL WIDTH OPTION: Add for 24" - 25" Panel Width - Copper SF

14.02.24 THICKNESS OPTION:

Zinc
Panel Price - 0.032", 18" - 19" Wide
Panels SF

14.02.25 THICKNESS OPTION:

Zinc
Panel Price - 0.040", 18" - 19" Wide
Panels SF

14.02.26 PANEL WIDTH OPTION: Add for 12" - 13" Panel Width - Zinc SF

14.02.27 PANEL WIDTH OPTION: Add for 16" - 17" Panel Width - Zinc SF

14.02.28 PANEL WIDTH OPTION: Add for 24" - 25" Panel Width - Zinc SF

14.02.29 PANEL INSTALLATION OPTION:

Architectural Application - Installed Over
a Deck At or Above 3:12 Slope SF

14.02.30 PANEL INSTALLATION OPTION:

Architectural Application - Installed Over
a Deck Below 3:12 Slope
SF

14.02.31 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Open Framing At or Above 3:12 Slope
SF

14.02.32 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Open Framing Below 3:12 Slope
SF

14.02.33 PANEL INSTALLATION OPTION:

Structural Application -
At or Above 3:12 Slope -
Installed Over Retrofit Framing System SF

14.02.34 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Retrofit Framing System Below 3:12
Slope
SF

14.02.35 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Existing Roof Using Steel Furring At or
Above 3:12 Slope
SF

14.02.36 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Existing Roof Using Steel Furring Below
3:12 Slope SF

14.02.37 PANEL FABRICATION OPTION:

On-Site Roll Forming - To achieve panel
lengths in excess of shipping or
transportation limitations SF

14.02.38 PANEL FABRICATION OPTION:

Curving Panels - Curving panels to meet
architectural requirements SF

14.02.39 PANEL FABRICATION OPTION:

Tapering Panels - Tapering panels to
meet architectural requirements SF

14.02.40 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 13.00
Must includes coverage for roof uplift
pressures up to 90 MPH SF

Page 24 of 50 ends

Addendum 1 - Pa Page 651ge 40 of 66

14.02.41 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

14.02.42 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

14.02.43 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

14.03 14.03.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum, 18" Wide Panels SF

14.03.02 THICKNESS OPTION:

Add for Bare Aluminum 0.040" Aluminum
, 18" Wide Panels SF

14.03.03 PANEL WIDTH OPTION: Add for 12" Panel Width - Aluminum SF

14.03.04 PANEL WIDTH OPTION: Add for 16" Panel Width - Aluminum SF

14.03.05 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga, 18" Wide Panels SF

14.03.06 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga, 18" Wide Panels SF

14.03.07 PANEL WIDTH OPTION:

Add for 12" Panel Width - Galvalume
Coated Steel or Equal SF

14.03.08 PANEL WIDTH OPTION:

Add for 16" Panel Width - Galvalume
Coated Steel or Equal SF

14.03.09 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

14.03.10 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

14.03.11 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

14.03.12 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga , 18" Wide Panels SF

14.03.13 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga, 18" Wide Panels SF

14.03.14 PANEL WIDTH OPTION: Add for 12" Panel Width - Stainless Steel SF

14.03.15 PANEL WIDTH OPTION: Add for 16" Panel Width - Stainless Steel SF

14.03.16 THICKNESS OPTION:

Copper
Panel Price - 16 oz,18" Wide Panels SF

14.03.17 THICKNESS OPTION:

Copper
Panel Price - 20 Oz, 18" Wide Panels SF

14.03.18 PANEL WIDTH OPTION: Add for 12" Panel Width - Copper SF

14.03.19 PANEL WIDTH OPTION: Add for 16" Panel Width - Copper SF

14.03.20 THICKNESS OPTION:

Zinc
Panel Price - 0.032", 18" Wide Panels SF

14.03.21 THICKNESS OPTION:

Zinc
Panel Price - 0.040", 18" Wide Panels SF

14.03.22 PANEL WIDTH OPTION: Add for 12" Panel Width - Zinc SF

14.03.23 PANEL WIDTH OPTION: Add for 16" Panel Width - Zinc SF

14.03.24 PANEL INSTALLATION OPTION:

Architectural Application - Installed Over
Substrate At or Above 3:12 Slope
SF

14.03.25 PANEL INSTALLATION OPTION:

Architectural Application - Installed Over
Substrate Below 3:12 Slope
SF

ROOF CONFIGURATION
Architectural or Structural Standing Seam Roof System; Seam Height At or Above 1" Below 2"; Aluminum Panels

Page 25 of 50 ends

Addendum 1 - Pa Page 652ge 41 of 66

14.03.26 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Open Framing At or Above 3/12 Slope
SF

14.03.27 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Retrofit Framing System At or Above
3:12 Slope
SF

14.03.28 PANEL INSTALLATION OPTION:

Structural Application - Installed Over
Existing Roof Using Steel Furring
At or Above 3:12 Slope SF

14.03.30 WARRANTY CHARGE:

Cost to Provide 20 Year - Labor &
Material Warranty with No Dollar
Limitations as a Standard Warranty for All
Applications in this Section 14.03
Must includes coverage for roof uplift
pressures up to 90 MPH SF

14.03.31 WARRANTY UPCHARGE:

Add to provide coverage for a 25 Year
Labor & Material Warranty with No Dollar
Limitations SF

14.03.32 WARRANTY UPCHARGE:

Add to provide coverage for a 30 Year
Labor & Material Warranty with No Dollar
Limitations SF

14.03.33 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

14.04 14.04.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum, 14.5" Wide Panels SF

14.04.02 THICKNESS OPTION:

Add for Bare Aluminum 0.040" Aluminum,

14.5" Wide Panels SF

14.04.03 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga, 14.5" Wide Panels SF

14.04.04 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga, 14.5" Wide Panels SF

14.04.05 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

14.04.06 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

14.04.07 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

14.04.08 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga, 14.5" Wide Panels SF

14.04.09 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga, 14.5" Wide Panels SF

14.04.10 THICKNESS OPTION:

Copper
Panel Price - 16 Oz., 14.5" Wide Panels SF

14.04.11 THICKNESS OPTION:

Copper
Panel Price - 20 Oz., 14.5" Wide Panels SF

14.04.12 THICKNESS OPTION:

Zinc
Panel Price - 0.032" , 14.5" Wide Panels SF

ROOF CONFIGURATION
Architectural Standing Seam Roof System; Seam Height Below 1"

Page 26 of 50 ends

Addendum 1 - Pa Page 653ge 42 of 66

14.04.13 THICKNESS OPTION:

Zinc
Panel Price - 0.040", 14.5" Wide Panels SF

14.04.14 PANEL INSTALLATION OPTION:

Architectural Application - Installed Over
Substrate At or Above 3:12 Slope SF

14.04.15 PANEL INSTALLATION OPTION:

Architectural Application - Installed Over
Substrate Below 3:12 Slope SF

14.04.16 WARRANTY CHARGE:

Cost to Provide 15 Year - Material
Warranty Limited to the Dollar Amount of
the Material Original Purchase as a
Standard Warranty for All Applications in
this Section 14.04
Must includes coverage for roof uplift
pressures up to 90 MPH SF

14.05 ROOF CONFIGURATION
Flat Seam Metal Roof System - 8' Wide / 30 Gauge

14.05.01 INSULATION OPTION:
3/4" of Expanded Polystyrene (Minimum

1.5 lbs./cft) - Includes Panel and
Installation of Roof System SF

14.05.02 INSULATION OPTION:

Mechanically Fastened Polyisocyanurate
with an Average R-Value of 20 - Includes
Panel and Installation of Roof System SF

14.05.03 UNDERLAYMENT OPTION:

Add Install 40 mil self-adhesive
membrane as an Underlayment SF

14.05.04 PANEL WIDTH OPTION: Add/Deduct for 6' Wide Option SF

14.05.05 PANEL WIDTH OPTION: Add/Deduct for 10' Wide Option SF

14.05.06 PANEL WIDTH OPTION: Add/Deduct for 12' Wide Option SF

14.05.07 WARRANTY CHARGES:

Cost to Provide 15 Year - Material
Warranty Limited to the Dollar Amount of
the Material Original Purchase as a
Standard Warranty for All Applications in
this Section 14.05
Must includes coverage for roof uplift
pressures up to 90 MPH SF

15.00 RESTORATIONS - RECOATING OF EXISTING ROOF SYSTEMS

15.01 SF

15.02 LF

15.03 SF

15.04 SF

15.05 SF

15.06 SF

15.07 SF

RESTORATION OF METAL ROOF SYSTEM WITH SYNTHETIC RUBBER COLD-APPLIED COATING Prepare Metal Roof Surface by Scraping, Sanding, Wire Brush or Blasting (USE SEPRATE LINE ITEM FOR BLASTING OR WIRE BRUSHING); Clean with TSP or Simple Green; Use Portable Blowers to Clear Roof of Moisture; Apply seam sealer to seams (1 Gallon per 14 left) Base Coat / Top Coat with Synthetic Rubberized Restorative Coating (1.5 Gallons per Sq.) According to Manufacturer's Specifications

RESTORATION OF A METAL ROOF SYSTEM WITH SINGLE-COMPONENT URETHANE Prepare Metal Roof Surface by Scraping, Sanding, Wire Brush or Blasting (USE SEPARATE LINE ITEM FOR BLASTING OR WIRE BRUSHING); Clean with TSP or Simple Green, Apply Primer with Rust Inhibiting and Chemical Corrosion Resistance at a Rate of 1/4 Gallon per Square; Wait at least 3 Hours for Primer to Dry; Strip in Seams, Around Penetrations and Fasteners with a Single-Component, Aliphatic Urethane at a Rate of 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on All Stripped in Areas) USE SEPARATE LINE ITEM; Wait 24-48 Hours; Apply Single-Component, Aliphatic Urethane as a Base Coat at a Rate of 1.5 Gallons per Square and Top Coat at a Rate of 1.0 Gallon per Square Over the Entire Roof According to Manufacturer's Specifications.

PREPARE METAL ROOF FOR RESTORATION BY WIRE BRUSHING ROOF SURFACE Wire Brush Metal Roof Surface to Remove Loose Paint, Rust or Expose Bare Metal

PREPARE METAL ROOF FOR RESTORATION BY WIRE BRUSHING METAL ROOF SEAMS Wire Brush Metal Roof Seams to Remove Loose Paint, Rust or Expose Bare Metal

PREPARE METAL ROOF FOR RESTORATION BY SANDBLASTING METAL ROOF Sand-Blast Metal Roof Surface and Seams to Remove Loose Paint, Rust or Expose Bare Metal

RESATURATION OF ASPHALT ROOF SURFACE WITH ASPHALT COATING SYSTEM Wet Vac Roof to Remove Aggregate, Apply Cold Applied Modified Asphalt Flood Coat & New Aggregate - Coating Applied at 6-8 Gallons per Sq. w/ New Gravel According to Manufacturer's Specifications (New Flashings also Required Separate Line Item)
RESATURATION OF ASPHALT OR COAL TAR PITCH BURs WITH COAL-TAR PITCH COATING SYSTEM Wet Vac Roof to Remove Aggregate, Apply Cold Applied Modified Coal Tar Flood Coat & New Aggregate as Specified Applied at 6-8 Gallons per Sq. w/ New Gravel According to Manufacturer's Specifications (New Flashings also Required Refer to Flashing Line Item)

Page 27 of 50 ends

Addendum 1 - Pa Page 654ge 43 of 66

15.08 SF

15.09 SF

15.10 SF

15.11 SF

15.12 SF

15.13 SF

15.14 SF

15.15 SF

RESTORATION OF A METAL ROOF SYSTEM WITH TWO-COMPONENT, LOW-ODER URETHANE Prepare Metal Roof Surface by Scraping, Sanding, Wire Brush or Blasting (USE SEPARATE LINE ITEM FOR BLASTING OR WIRE BRUSHING); Clean with TSP or Simple Green, Apply Primer with Rust Inhibiting and Chemical Corrosion Resistance at a Rate of 1/4 Gallon per Square; Wait at least 3 Hours for Primer to Dry; Strip in Seams, Around Penetrations and Fasteners with a Two-Component, Low-Oder Urethane at a Rate of 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on All Stripped-In Areas) USE SEPARATE LINE ITEM; Wait 24-48 Hours; Apply Two-Component, Low-Oder Urethane as a Base Coat at a Rate of 1.5 Gallons per Square and Top Coat at a Rate of 1.0 Gallon per Square Over the Entire Roof According to Manufacturer's Specifications.

COAT ROOF WITH HIGH PERFORMANCE FLUORPOLYMER PAINT SYSTEM FOR METAL ROOFS Prepare Metal Roof Surface by Scraping, Sanding, Wire Brushing or Blasting (USE SEPARATE LINE ITEM FOR BLASTING & WIRE BRUSHING); Clean with TSP or Simple Green, Prime at a Rate of (Primer 1/4" Gallon per Square); Wait; Install Base Coat and Top Coat at a Rate of 1/4 Gallon per Sq. per Coat According to Manufacturer's Specifications

RESTORATION OF A SINGLE-PLY WITH SINGLE-COMPONENT URETHANE & STRIPPED SEAMS Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Strip in Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Single-Component, Aliphatic Urethane as a Base Coat at a Rate of 1.5 Gallons per Square and Top Coat at a Rate of 1.0 Gallon per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF SMOOTH-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH SINGLE-COMPONENT

URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Single-Component, Aliphatic Urethane as a Base Coat at a Rate of 2 Gallons per Square and a Top Coat of 1.5 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A SINGLE-PLY ROOF OR SMOOTH-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLYREINFORCED, SINGLE-COMPONENT URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3.0 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply Single-Component, Aliphatic Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A MINERAL-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH SINGLE-COMPONENT

URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Single-Component, Aliphatic Urethane as a Base Coat at a Rate of 2.0 Gallons per Square and Top Coat at a Rate of 2.0 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A MINERAL-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLY-REINFORCED, SINGLECOMPONENT URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1.5 Gallon per Square (3.5 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply Single-Component, Aliphatic Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A SINGLE-PLY WITH TWO-COMPONENT, LOW-ODER URETHANE & STRIPPED SEAMS Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Strip in Seams by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Two-Component, Low-Oder Urethane as a Base Coat at a Rate of 1.5 Gallons per Square and a Top Coat at a Rate of 1.0 Gallon per Square Over the Entire Roof According to Manufacturer's Specifications.

Page 28 of 50 ends

Addendum 1 - Pa Page 655ge 44 of 66

15.16 SF

15.17 SF

15.18 SF

15.19 SF

15.20 SF

15.21 SF

15.22 SF

15.23 SF

15.24 SF

15.25 SF
RESTORATION OF A MINERAL-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH TWO-COMPONENT,

LOW-ODOR URETHANE & REINFORCED SEAMS
Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Two-Component, Low-Oder Urethane 2.0 Gallons per Square / Reinforcement / 1.0 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Two-Component, Low-Oder Urethane as a Base Coat at a Rate of 2.0 Gallons per Square and a Top Coat at a Rate of 2.0 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A MINERAL-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLY-REINFORCED, TWOCOMPONENT, LOW-ODER URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement /

1.5 Gallon per Square (3.5 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply Two-Component, LowOder Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESATURATION OF SMOOTH-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared roof scan roof system and replace all wet insulation (USE SEPARATE LINE ITEMS); Prime the roof surface at rate of 1/2 - 3/4 Gallons per Square; Apply heavy-bodied, fiber reinforced asphalt roof coating and embed firm polyester reinforcement at a rate of 3.0 Gallons per Square / Polyester /3.5 Gallons per Square.

RESATURATION OF SMOOTH-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared roof scan roof system and replace all wet insulation (USE SEPARATE LINE ITEMS); Prime the roof surface at rate of 1/2 - 3/4 Gallons per Square; Apply heavy-bodied, fiber reinforced asphalt roof coating and embed soft polyester reinforcement at a rate of 1.2 Gallons per Square / Polyester /1.4 Gallons per Square.

RESATURATION OF MINERAL-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared roof scan roof system and replace all wet insulation (USE SEPARATE LINE ITEMS); Prime the roof surface at rate of 1/2 - 3/4 Gallons per Square; Apply heavy-bodied, fiber reinforced asphalt roof coating and embed firm polyester reinforcement at a rate of 3.5 Gallons per Square / Polyester / 3.5 Gallons per Square.

RESATURATION OF MINERAL-SURFACED ASPHALT ROOF WITH FULLY REINFORCED FIBERED ASPHALT

COATING SYSTEM
Infrared Roof Scan Roof System And Replace All Wet Insulation (Use Separate Line Items); Prime The Roof Surface At Rate Of 1/2 - 3/4 Gallons Per Square; Apply Heavy-Bodied, Fiber Reinforced Asphalt Roof Coating And Embed Soft Polyester Reinforcement At A Rate Of 1.4 Gallons Per Square / Polyester /1.4 Gallons Per Square.

RESTORATION OF SMOOTH-SURFACED BURs/MODIFIED BURS ROOF SYSTEMS WITH TWO-COMPONENT, LOWODER URETHANE & REINFORCED SEAMS Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Seams by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square on Seams) USE SEPARATE LINE ITEM, Wait 24-48 Hours, Apply Two-Component, LowOder Urethane as a Base Coat at a Rate of 2 Gallons per Square and a Top Coat at a Rate of 1.5 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

RESTORATION OF A SINGLE-PLY ROOF OR SMOOTH-SURFACE BUR/MODIFIED BUR SYSTEMS WITH FULLYREINFORCED, TWO-COMPONENT, LOW-ODER URETHANE Prepare Roof Surface by Cleaning with TSP or Simple Green, Use Portable Blowers to Clear the Roof Surface of Moisture; Reinforce Entire Roof Surface by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1 Gallon per Square (3 Gallons per Square Total Prior to Top Coat), Wait 24-48 Hours, Apply Two-Component, Low-Oder Urethane as a Top Coat at a Rate of 2 Gallons per Square Over the Entire Roof According to Manufacturer's Specifications.

COAT EXISTING ROOF SURFACE WITH FIBRATED ALUMINUM ROOF COATING Prepare Roof Surface by Sweeping Off All Dirt, Dust and Debris; If Existing Roof Surface is Weathered, Prime the Roof Surface at a Rate of 1 Gallon per Square; If Repairs to Any Cracks, Splits or Surface Irregularities Exist, Repair with a 3 Course Application of Mastic / Mesh / Mastic (USE SEPARATE LINE ITEM); Apply Fibrated Aluminum Roof Coating at a Rate of 2 Gallons per Square.

RESTORATION OF SMOOTH-SURFACED OR MINERAL-SURFACED ASPHALT-BASED ROOF WITH FULLYREINFORCED GLASS FIBERED ASPHALT EMULSION Prepare Roof Surface to be Clean & Free of Dust; Repair All Splits Tears of Blisters with a Three Course Application of Mastic / Mesh / Mastic (USE SEPARATE LINE ITEM); Prime the Roof Surface at a Rate of 1/2 Gallon per Square. Embed Polyester into the Asphalt Emulsion in a 2 Coat Application at a Rate of 3 Gallons per Square / Polyester / 3 Gallons per Square

Page 29 of 50 ends

Addendum 1 - Pa Page 656ge 45 of 66

15.26 SF

15.27 SF

15.28 SF

15.29 SF

15.30 LF

15.31 LF

15.32 LF

15.33 LF

16.00 INSTALLATION OF SHAKE, TILE, OR SHINGLE ROOF SYSTEMS

16.01 SF

16.02 SF

16.03 SF

16.04 SF

16.05 SF

16.06 SF

16.07 SF

17.00 FULLY ADHERED SINGLE-PLY ROOF SYSTEMS

17.01 METAL DECK - SINGLE-PLY APPLICATION

17.01.01 INSULATION OPTION:

Mechanically Fasten Polyisocyanurate /
Adhere 1/2" Treated Gypsum Insulation
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal) with Insulation
Adhesive to Provide an Average R-Value
of 20 SF

17.02 WOOD/TECTUM DECK - SINGLE-PLY APPLICATION

REINFORCING SEAMS WITH SINGLE-COMPONENT URETHANE
Reinforce Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square / Reinforcement / 1 Gallons per Square (3 Gallons per Square on Seams)

REINFORCING SEAMS WITH TWO-COMPONENT, LOW-ODER URETHANE Reinforce Seams by Applying a Two-Component, Low-Oder Urethane 2 Gallons per Square / Reinforcement / 1 Gallons per Square (3 Gallons per Square on Seams)

STRIPPING IN SEAMS WITH SINGLE-COMPONENT URETHANE
Strip in Seams by Applying a Single-Component, Aliphatic Urethane 2 Gallons per Square

STRIPPING IN SEAMS WITH TWO-COMPONENT, LOW-ODER URETHANE Strip in Seams by Applying a Two-Component, Low Odor Urethane 2 Gallons per Square

INSTALL NEW THREE-TAB SHINGLE ROOF SYSTEM -
New Three-Tab Shingles with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

REPLACING ARCHITECTURAL SHINGLE ROOF SYSTEM -
New Dimensional Shingle Roof System with Base Sheet as an Underlayment, Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

RESTORATION OF SMOOTH-SURFACED OR MINERAL-SURFACED ASPHALT-BASED ROOF WITH GLASS

FIBERED ASPHALT EMULSION
Prepare Roof Surface to be Clean & Free of Dust; Repair All Splits Tears of Blisters with a Three Course Application of Mastic / Mesh / Mastic (USE SEPARATE LINE ITEM); Prime the Roof Surface at a Rate of 1/2 Gallon per Square. Apply Asphalt Emulsion in a 2 Coat Application at a Rate of 2.5 Gallons per Square per Coat.

RESTORATION OF SINGLE-PLY, SMOOTH-SURFACED OR MINERAL-SURFACED ASPHALT-BASED ROOF WITH

SILICONE COATING
Prepare Roof Surface to be Clean & Free of Dust; Apply Silicone Coating System in a Single Coat Application at a Rate of

2.5 Gallons per Square

RESTORATION OF GRAVEL-SURFACED ASPHALT-BASED ROOF WITH SILICONE COATING Wet Vac or Spud Any Loose Gravel Off of Roof Surface & Dispose; Sweep Roof Surface to be Clean and Free of Dust; Apply Primer as a Bleed-Blocker at a Rate of 1/2 Gallon per Square; Apply Self-Leveling Silicone at a Rate of 6 Gallons per Square; Apply Silicone Coating System in a Single Coat Application at a Rate of 2.5 Gallons per Square.

ELASTOMERIC ASPHALT-BASED LIQUID APPLIED MEMBRANE SYSTEM FOR SMOOTH OR MINERAL

SURFACED ROOFS
Clean and Prime then Install Base Coat / Top Coat as Specified with Reinforced Seams - Restoration Coating Fully Reinforced System w/ Reflective Top Coat (3 Gallons per Sq. of Restoration Coating - Reinforcement - Additional 3 Gallons per Sq. of Restoration Coating; Allow 30 Day Cure and Install Reflective Coating at 1 Gallon per Sq. (New Flashings also Required Refer to Flashing Line Item)

INSTALL NEW DIMENSIONAL SHINGLE ROOF SYSTEM -
New Dimensional Shingle Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

INSTALL NEW CEDAR SHAKE ROOF SYSTEM -
New Cedar Shake Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

INSTALL NEW BARREL CLAY/CEMENT TILE ROOF SYSTEM -
New Barrel Clay/Cement Tile Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

INSTALL SLATE TILE ROOF SYSTEM -
New Slate Tile Roof System with Base Sheet as an Underlayment; Install Self-Adhering Underlayment on All Eaves, Peaks & Valleys

ADD/DEDIUCT TO INSTALL SELF-ADHERING UNDERLAYMENT OVER ENTIRE ROOF - Install Self-Adhering Underlayment on Entire Roof Deck

Page 30 of 50 ends

Addendum 1 - Pa Page 657ge 46 of 66

17.02.01 INSULATION OPTION:

WOOD DECK: Mechanically Fasten
Polyisocyanurate /
Adhere Treated 1/2" Gypsum Insulation
Board with Glass-Mat (e.g. DensDeck /
Securock / Equal) with Insulation
Adhesive to Provide an Average R-Value
of 20 SF

17.02.02 INSULATION OPTION:

TECTUM DECK: Mechanically Attach
Base Sheet & Adhere Polyisocyanurate
in Insulation Adhesive / Adhere 1/2"
Treated Gypsum Insulation Board with
Glass-Mat (e.g. DensDeck / Securock /
Equal) in Insulation Adhesive to Provide
an Average R-Value of 20 SF

17.02.03 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

17.03 LIGHTWEIGHT CONCRETE/GYPSUM DECK - SINGLE-PLY APPLICATION

17.03.01 INSULATION OPTION:

Adhere Polyisocyanurate in Insulation
Adhesive / Adhere 1/2" Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) in
Insulation Adhesive to Provide an
Average R-Value of 20 SF

17.03.02 INSULATION OPTION:

Without Insulation - Must Include Rosin &
Mechanically Fasten Glass Base Sheet SF

17.04 CONCRETE DECK - SINGLE-PLY APPLICATION

17.04.01 INSULATION OPTION:

Adhere Polyisocyanurate in Insulation
Adhesive / Adhere 1/2" Treated Gypsum
Insulation Board with Glass-Mat (e.g.

DensDeck / Securock / Equal) in
Insulation Adhesive to Provide an
Average R-Value of 20 SF

17.04.02 INSULATION OPTION:

Minimal Insulation - Must Adhere 1/2"
Treated Gypsum Insulation Board with
Glass-Mat (e.g. DensDeck / Securock /
Equal) in Insulation Adhesive to Provide
an Average R-Value of 20 SF

17.05 17.05.01 SINGLE-PLY ROOF TYPE:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 45 Mil
Thickness SF

17.05.02 SINGLE-PLY ROOF TYPE:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 60 Mil
Thickness SF

17.05.03 SINGLE-PLY ROOF TYPE:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 90 Mil
Thickness SF

17.05.04 SINGLE-PLY ROOF TYPE:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 45 Mil Thickness SF

17.05.05 SINGLE-PLY ROOF TYPE:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 60 Mil Thickness SF

17.05.06 SINGLE-PLY ROOF TYPE:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 90 Mil Thickness SF

17.05.07 SINGLE-PLY ROOF TYPE:

ASTM D 4434 - Poly Vinyl Chloride (PVC)
- 45 Mil Thickness SF

17.05.08 SINGLE-PLY ROOF TYPE:

ASTM D 4434 - Poly Vinyl Chloride (PVC)
- 60 Mil Thickness SF

17.05.09 SINGLE-PLY ROOF TYPE:

ASTM D 4434 - Poly Vinyl Chloride (PVC)
- 90 Mil Thickness SF
ROOF CONFIGURATION:

Fully Adhered Single-Ply Roof System Installed Over Prepared Surface or Insulation

Page 31 of 50 ends

Addendum 1 - Pa Page 658ge 47 of 66

17.05.10 SINGLE-PLY ROOF TYPE:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 45 Mil Thickness SF

17.05.11 SINGLE-PLY ROOF TYPE:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 60 Mil Thickness SF

17.05.12 SINGLE-PLY ROOF TYPE:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 80 Mil Thickness SF

17.05.13 INSTALLATION OPTION:

Add / Deduct for Mechanically Attaching
Single-Ply Roof System Vs. Fully
Adhering SF

17.05.15 WARRANTY CHARGES:

Cost to Provide 15 Year - Material
Warranty Limited to the Dollar Amount of
the Material Original Purchase as a
Standard Warranty for All Applications in
this Section 17.05
Must includes coverage for roof uplift
pressures up to 90 MPH SF

17.05.16 WARRANTY UPCHARGE:

Add to provide coverage for a 15 Year
Labor & Material Warranty with No Dollar
Limitations SF

17.05.17 WARRANTY UPCHARGE:

Add to provide coverage for a 20 Year
Labor & Material Warranty with No Dollar
Limitations SF

17.05.18 WARRANTY UPCHARGE:

Add to provide coverage for roof uplift
pressures up to 120 MPH SF

18.00 FLUID APPLIED WATERPROOFING MEMBRANE SYSTEMS WITH

POLYURETHANE RESIN COATINGS

18.01 18.01.01 FLUID APPLIED MEMBRANE SYSTEM: Two Coat System SF

18.01.02 FLUID APPLIED MEMBRANE SYSTEM: Three Coat System SF

18.01.03 FLUID APPLIED MEMBRANE SYSTEM: Three Coat Reinforced System SF

18.01.04 FLUID APPLIED MEMBRANE SYSTEM: Four Coat Reinforced System SF

18.01.05 WARRANTY CHARGES:
5 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.01 SF

18.01.06 WARRANTY CHARGES:
10 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.01 SF

18.02 POLYURETHANE COATINGS DIRECT TO WOOD SUBSTRATE

18.02.01 FLUID APPLIED MEMBRANE SYSTEM: Two Coat System SF

18.02.02 FLUID APPLIED MEMBRANE SYSTEM: Three Coat System SF

18.02.03 FLUID APPLIED MEMBRANE SYSTEM: Three Coat Reinforced System SF

18.02.04 FLUID APPLIED MEMBRANE SYSTEM: Four Coat Reinforced System SF

18.02.05 WARRANTY CHARGES:
5 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.02 SF

18.02.06 WARRANTY CHARGES:
10 Year Waterproofing Material Warranty
Limited to the Dollar Amount of the
Material Original Purchase as a Standard
Warranty for All Applications in this
Section 18.02 SF

18.03 POLYURETHANE COATINGS DIRECT TO PRIMED CONCRETE SUBSTRATE (INCLUDE PRIMER FOR CONCRETE

SUBSTRATE)

FLUID APPLIED WATERPROOFING MEMBRANE SYSTEM BASE ON POLYURETHANE RESINS - CONCRETE

SURFACE REPAIRS & PREPARATION

Page 32 of 50 ends

Addendum 1 - Pa Page 659ge 48 of 66

18.03.01 SF

18.03.02 SF

18.03.03 SF

18.03.04 SF

18.03.05 SF

18.03.06 SF

18.03.07 SF

18.03.08 SF

18.03.09 SF

18.03.10 SF

18.03.11 SF

18.03.12 SF

18.03.13 SF

18.03.14 SF

18.03.15 SF

18.04 18.04.01 LF

18.04.02 LF

18.04.03 LF

18.04.04 LF

18.04.05 LF

18.04.06 SF

18.05 18.05.01 LF

18.05.02 LF

19.00 WALL COATINGS FOR COATING WALL SYSTEMS

19.01 SF

19.02 SF

19.03 SF

19.04 SF

20.00 NEW FLASHINGS FOR ROOFING SYSTEMS & RESTORATION OPTIONS

20.01 CONCRETE REPAIRS TO OVERHEAD SURFACES: 2"-4" DEPTH Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO OVERHEAD SURFACES: FULL DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO VERTICAL SURFACES: 3"-5" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO VERTICAL SURFACES - 5"-8" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement

MILLING
Mill an existing coating 1/8 inch to 1/4 inch

PRESSURE WASHING - HORIZONTAL
Pressure washing horizontal surfaces with 2000 PSI or greater

PRESSURE WASHING - VERTICAL
Pressure washing horizontal surfaces with 2000 PSI or greater

SAND BLASTING
Sand blast an existing coating

SHOT BLASTING
Shot blast an existing coating

FLUID APPLIED WATERPROOFING MEMBRANE SYSTEM BASE ON POLYURETHANE RESINS - ANCILARY

REPAIRS & SURFACE PREPARATION

CONCRETE REPAIRS TO VERTICAL SURFACES - FULL DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement CONCRETE REPAIRS TO HORIZONTAL SURFACES: 2"-4" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation CONCRETE REPAIRS TO HORIZONTAL SURFACES - 4"-6" DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement

CONCRETE REPAIRS TO HORIZONTAL SURFACES - FULL DEPTH
Removal and replacement of damaged concrete to exclude substrate repair / re-installation; includes reinforcement

GRINDING
Grind an existing coating

HANDHELD GRINDING
Grind an existing coating in areas that only can be done by hand

FLUID APPLIED WATERPROOFING MEMBRANE SYSTEM BASE ON POLYURETHANE RESINS - ADDITIONAL

OPTIONS FOR APPLICATION & SURFACING

INSTALL REINFORCEMENT IN COATING SYSTEM
Installation of reinforcement adjustment of coverage rates to accommodate reinforcement

BROADCAST GRANULES TO PROVIDE SKID RESISTANCE
Broadcast aggregate or granules to provide skid resistance in top coat

ELASTOMERIC COATING FOR STUCCO WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified

ELASTOMERIC COATING FOR EFIS WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified

ELASTOMERIC COATING FOR CMU WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified

STRUCTURAL EXPANSION JOINT
Installation or replacement of an expansion joint that is necessary for structural integrity

CAULKING JOINTS
Installation of caulking in joints. See caulking chart

ROUTING AND REMOVAL OF EXISTING CAULK
Rout and remove of existing caulk out of expansion joints

EPOXY INJECTION FOR CRACK REPAIR
Route cracks, drill holes every 18" inches, and inject and seal with epoxy

TAPE WOOD DECK JOINTS - INSTALLATION OF TAPE ON DECK JOINTS

WOOD SUBSTRATE REPLACEMENT - REMOVAL AND REPLACEMENT

ELASTOMERIC COATING FOR CONCRETE TILT WALL SYSTEM -
Base Coat of Coating @ 1 Gallon per Sq. / Top Coat @ 1 Gallon per Sq. Applied as Specified ROOF FLASHINGS FOR MODIFIED & COAL TAR PITCH ROOF SYSTEMS:

Minimum 1 Ply of Base Flashing and Mineral Cap Sheet Installed in Hot ASTM D 312 Type III or IV Asphalt

Page 33 of 50 ends

Addendum 1 - Pa Page 660ge 49 of 66

20.01.01 FLASHING OPTION:

Separate Base & Top Ply: BASE PLY:

SBS Modified Fiberglass Reinforced
Base Flashing Ply w/ Tensile Strength of
100 lbf/in tensile (ASTM D 5147); TOP
PLY: ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type II - 80 lbf/in tensile SF

20.01.02 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type III - 220
lbf/in tensile SF

20.01.03 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 310
lbf/in tensile SF

20.01.04 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 500
lbf/in tensile SF

20.01.05 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 100 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 600
lbf/in tensile SF

20.01.01 FLASHING OPTION:

Separate Base & Top Ply: BASE PLY:

SBS Modified Fiberglass Reinforced
Base Flashing Ply w/ Tensile Strength of
200 lbf/in tensile (ASTM D 5147); TOP
PLY: ASTM D 6163 SBS Fiberglass
Reinforced Modified Bituminous Sheet
Material Type II - 80 lbf/in tensile SF

20.01.02 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type III - 220
lbf/in tensile SF

20.01.03 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 310
lbf/in tensile SF

20.01.04 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 500
lbf/in tensile SF

Page 34 of 50 ends

Addendum 1 - Pa Page 661ge 50 of 66

20.01.05 FLASHING OPTION:

BASE PLY: SBS Modified Fiberglass
Reinforced Base Flashing Ply w/ Tensile
Strength of 200 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 600
lbf/in tensile SF

20.01.06 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type II - 80
lbf/in tensile SF

20.01.07 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6163 SBS
Fiberglass Reinforced Modified
Bituminous Sheet Material Type III - 220
lbf/in tensile SF

20.01.08 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 310
lbf/in tensile SF

20.01.09 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 500
lbf/in tensile SF

20.01.10 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Flashing Ply - 300 lbf/in tensile (ASTM D
5147); TOP PLY: ASTM D 6162 SBS
Fiberglass/Polyester Reinforced Modified
Bituminous Sheet Material Type III - 600
lbf/in tensile SF

20.01.11 SF

20.01.12 SF

20.02 Torch Applied Flashings -
Minimum 1 Ply of Torch Base and Torch Mineral Cap Sheet; Torch Applied

20.02.01 FLASHING OPTION:

BASE PLY: SBS Modified
Polyester/Fiberglass Reinforced Base
Torch Applied Flashing Ply - 80 lbf/inch
tensile (ASTM D 5147); TOP PLY: ASTM
D 6162 SBS Fiberglass/Polyester
Reinforced Modified Bituminous Sheet
Material Type III - 300 lbf/in Tensile
Torch Applied Membrane SF

20.03 PER SQUARE FOOT COSTS - INSTALLING IN COLD PROCESS FLASHING ADHESIVE Substitute Hot Asphalt Application for Cold Process Flashing Adhesive Application

PER SQUARE FOOT COSTS - INSTALLING IN COLD PROCESS FLASHING ADHESIVE Substitute Hot Asphalt Application for No VOCs, 100% Solids Cold Process Flashing Adhesive Application Self-Adhering Flashings -
Minimum 1 Ply of Self-Adhering Base and Self-Adhering Mineral Cap Sheet; Self-Adhering

Page 35 of 50 ends

Addendum 1 - Pa Page 662ge 51 of 66

20.03.01 FLASHING OPTION:

BASE PLY: SBS Polyester OR
Fiberglass/Polyester OR Fiberglass
Reinforced Self-Adhering Flashing Ply -
50 lbf/ tensile (ASTM D 5147); TOP PLY:

ASTM D 6161 (Polyester) OR 6162
(Fiberglass/Polyester) OR 6163
(Fiberglass) Self-Adhering Reinforced
Modified Bituminous Membrane Type III -
130 lbf/in tensile SF

20.04 20.04.01 ROOF MEMBRANE OPTION:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 45 Mil
Thickness SF

20.04.02 ROOF MEMBRANE OPTION:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 60 Mil
Thickness SF

20.04.03 ROOF MEMBRANE OPTION:

ASTM D 4637 - Ethylene Propylene
Diene Terpolymer (EPDM) - 90 Mil
Thickness SF

20.04.04 ROOF MEMBRANE OPTION:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 45 Mil Thickness SF

20.04.05 ROOF MEMBRANE OPTION:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 60 Mil Thickness SF

20.04.06 ROOF MEMBRANE OPTION:

ASTM D 6878 - Thermoplastic Polyolefin
(TPO) - 90 Mil Thickness SF

20.04.07 ROOF MEMBRANE OPTION:

ASTM D 4434 - Poly Vinyl Chloride (PVC)
- 45 Mil Thickness SF

20.04.08 ROOF MEMBRANE OPTION:

ASTM D 4434 - Poly Vinyl Chloride (PVC)
- 60 Mil Thickness SF

20.04.09 ROOF MEMBRANE OPTION:

ASTM D 4434 - Poly Vinyl Chloride (PVC)
- 90 Mil Thickness SF

20.04.10 ROOF MEMBRANE OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 45 Mil Thickness SF

20.04.11 ROOF MEMBRANE OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 60 Mil Thickness SF

20.04.12 ROOF MEMBRANE OPTION:

ASTM D 6754 - Ketone Ethylene Ester
(KEE) - 80 Mil Thickness SF

21.00 METAL WALL PANEL SYSTEMS

21.01 WALL SYSTEM
Exposed Fastener Wall Panel System

21.01.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum, 36" Wide Panels SF

21.01.02 THICKNESS OPTION:

Add for Bare Aluminum 0.040"
Aluminum, 36" Wide Panels SF

21.01.03 PANEL WIDTH OPTION: Add for 32" Panel Width - Aluminum SF

21.01.04 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga, 36" Wide Panels SF

21.01.05 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga, 36" Wide Panels SF

21.01.06 PANEL WIDTH OPTION:

Add for 32" Panel Width - Galvalume
Coated Steel or Equal SF

21.01.07 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

21.01.08 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF
Single-Ply Flashings -
Fully Adhered Single-Ply Roof Flashings Installed on Corresponding Single-Ply Roof Systems

Page 36 of 50 ends

Addendum 1 - Pa Page 663ge 52 of 66

21.01.09 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

21.01.10 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga, 36" Wide Panels SF

21.01.11 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga, 36" Wide Panels SF

21.01.12 PANEL WIDTH OPTION: Add for 32" Panel Width - Stainless Steel SF

21.01.13 THICKNESS OPTION:

Copper
Panel Price - 16 Oz., 36" Wide Panels SF

21.01.14 THICKNESS OPTION:

Copper
Panel Price - 20 Oz., 36" Wide Panels SF

21.01.15 PANEL WIDTH OPTION: Add for 32" Panel Width - Copper SF

21.01.16 THICKNESS OPTION:

Zinc
Panel Price - 0.032", 36" Wide Panels SF

21.01.17 THICKNESS OPTION:

Zinc
Panel Price - 0.040", 36" Wide Panels SF

21.01.18 PANEL WIDTH OPTION: Add for 32" Panel Width - Zinc SF

21.01.19 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; 3/4" of Expanded Polystyrene
(Minimum 1.5 lbs./cft) Installed Between
Girts SF

21.01.20 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Fastened
Polyisocyanurate with an Average RValue of 19 Installed Between Girts SF

21.01.21 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Attach Batten
Fiberglass Insulation with an Average RValue of 19 Installed Between Girts SF

21.01.22 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Steel Stud Wall - Exterior Gypsum
Sheeting 1/2" to 5/8" Thickness, Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.01.23 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Existing Wall Construction - Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.01.24 PANEL INSTALLATION & INSULATION OPTION: Over Plywood; No Insulation SF

21.02 WALL SYSTEM
Concealed Fastener Wall Panel System - 12" Wide Panels

21.02.01 THICKNESS OPTION:

Bare Aluminum Panel Price -

0.032" Aluminum Thickness SF

21.02.02 THICKNESS OPTION: Add for Bare Aluminum, 0.040" Aluminum SF

21.02.03 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 24 Ga SF

21.02.04 THICKNESS OPTION:

Bare Galvalume Coated Steel or Equal
Panel Price - 22 Ga SF

21.02.05 COLOR OPTION:

Add for Standard Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

21.02.06 COLOR OPTION:

Add for Designer Colors - Fluorocarbon
Paint System Over Aluminum or
Galvalume Coated Steel Or Equal SF

Page 37 of 50 ends

Addendum 1 - Pa Page 664ge 53 of 66

21.02.07 COLOR OPTION:

Add for Premium or Custom Colors -
Fluorocarbon Paint System Over
Aluminum or Galvalume Coated Steel Or
Equal SF

21.02.08 THICKNESS OPTION:

Stainless Steel
Panel Price - 24 Ga Thickness SF

21.02.09 THICKNESS OPTION:

Stainless Steel
Panel Price - 22 Ga Thickness SF

21.02.10 THICKNESS OPTION:

Copper
Panel Price - 16 Oz Thickness SF

21.02.11 THICKNESS OPTION:

Copper
Panel Price - 20 Oz Thickness SF

21.02.12 THICKNESS OPTION:

Zinc
Panel Price - 0.032" Thickness SF

21.02.13 THICKNESS OPTION:

Zinc
Panel Price - 0.040" Thickness SF

21.02.14 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; 3/4" of Expanded Polystyrene
(Minimum 1.5 lbs./cft) Installed Between
Girts SF

21.02.15 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Fastened
Polyisocyanurate with an Average RValue of 19 Installed Between Girts SF

21.02.16 PANEL INSTALLATION & INSULATION OPTION:

Over Girts; Mechanically Attach Batten
Fiberglass Insulation with an Average RValue of 19 Installed Between Girts SF

21.02.17 PANEL INSTALLATION & INSULATION OPTION: Over Plywood; No Insulation SF

21.02.18 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Steel Stud Wall - Exterior Gypsum
Sheeting 1/2" to 5/8" Thickness, Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.02.19 PANEL INSTALLATION & INSULATION OPTION:

RAIN SCREEN CONFIGURATION:

Over Existing Wall Construction - Air
Barrier (Priced Separately Below), Rock
Wool or Extruded Polystyrene Insulation
(Priced Separately Below) & Metal Wall
Panel Drainage, Ventilation and
Attachment System SF

21.02.20 PANEL TYPE OPTION:

Add for Factory Insulated Concealed
Fastener Wall Panel SF

21.03 21.03.01 Non-Permeable Option: Fluid Applied System - ASTM 2178 SF

21.03.02 Non-Permeable Option:

Fluid Applied Water Based System -
ASTM 2178 SF

21.03.03 Non-Permeable Option: Membrane System - ASTM E 2178 SF

21.03.04 Permeable Option:

Fluid Applied System - ASTM E 2178 &
ASTM E 96 SF

21.03.05 Permeable Option:

Fluid Applied Water Based System -
ASTM 2178 & ASTM E 96 SF

21.03.06 Permeable Option:

Membrane System - ASTM 2178 &
ASTM E 96 SF

21.04 21.04.01 Insulation Option: 1" Rock Wool Insulation Installed SF

21.04.02 Insulation Option: 2" Rock Wool Insulation Installed SF

21.04.03 Insulation Option: 3" Rock Wool Insulation Installed SF

AIR BARRIER FOR WALL APPLICATIONS (BRICK, CMU, MASONARY WALLS OR STUD WALL WITH EXTERIOR

GYPSUM SHEETING)

INSULATION FOR WALL APPLICATIONS (INSTALLED OVER AIR BARRIERS)

Page 38 of 50 ends

Addendum 1 - Pa Page 665ge 54 of 66

21.04.04 Insulation Option: 4" Rock Wool Insulation Installed SF

21.04.05 Insulation Option:
1" Extruded Polystyrene Insulation
Installed SF

21.04.06 Insulation Option:
2" Extruded Polystyrene Insulation
Installed SF

21.04.07 Insulation Option:
3" Extruded Polystyrene Insulation
Installed SF

21.04.08 Insulation Option:
4" Extruded Polystyrene Insulation
Installed SF

22.00 22.01 %

22.02 %

22.03 %

22.04 %

22.05 %

22.06 %

22.07 %

22.08 %

22.09 %

JOB SITE SPECIFIC MULTIPLIERS
The multipliers are applied to all line items in total (unless the contrary is specifically identified in the description) for the project because the conditions they address effect overall labor production, construction complexity and/or equipment requirements. Multiple Job Site Specific Multipliers can be used on a single project, but they are not meant to compound on each other.

For Reference: Attachment B Pricing in this IFB is for material, equipment, tools, labor and supervision necessary to install the line item. It is based upon a 200 - 300 square roofing project that is being performed on a box- or rectangular-shaped building. It is also assumed that the project will have only one roof level that is not more than 20 ft high from the ground. The roof is anticipated to have clear access point and minimal penetrations/obstructions. It is also based upon a 200 - 300 square masonry, wall panel or waterproofing project. The exterior sides of the building are assumed to be box- or rectangular- shaped with minimal doors, windows, penetrations or obstructions. It is anticipated that the sides of the building will have clear tie-off points and easy to access while work is being performed.

MULTIPLIER - DIFFICULT ROOF OR BUILDING ACCESS
Multiplier is applied when labor production is effected by roof or building access. Situations that can cause roof access to be more difficult include, but are not limited to: no access for lifts or cranes, access is dependent upon road closure, access point requires the closure of a building entrance, roof level is not accessible from the ground, roof area is interior to adjacent roofs or roof materials and materials and equipment must be loaded to one roof area and carried to another roof area, roof materials and equipment must be carried to the roof through an interior building access point, no or limited staging areas on the ground, etc.

MULTIPLIER - SECURE ACCESS IS REQUIRED TO WORK ON ROOF OR WALLS Multiplier is applied when labor production is effected daily by the lost time in getting through security or getting access to the job site. Situations include, but are not limited to clearing each employee and all tools through metal detectors, passing through security gates with vehicles, tradespeople and equipment, stringent background checks or higher clearance levels, etc.

MULTIPLIER - MULTIPLE MATERIAL STAGINGS
Multiplier is applied when labor production is effected by the time it takes to stage a roof multiple times. Situations include, but are not limited to staging materials to perform work on multiple roof levels, planned shutdowns and restarts, portion of the job is over sensitive work areas requiring staging from more than one point, etc.

MULTIPLIER - ACCELERATED SCHEDULE
Multiplier is applied when increased labor burdens are required due to an accelerated work schedule. Situations include, but are not limited to requiring multiple concurrent trade crews beyond what is normally expected for project size, work to be performed on two (back-to-back) shifts, work requires larger than standard crew sizes, etc.

MULTIPLIER - NIGHT, WEEKEND OR HOLIDAY WORKING HOURS
Multiplier is applied when increased labor burdens are required due to working hours being limited to nights (equivalent of 3rd shift), weekends or holidays.

MULTIPLIER - ROOF OR WALLS HAVE LARGE AMOUNT OF PENETRATIONS / ROOF TOP OBSTRUCTIONS Multiplier is applied when labor production is effected a large number of roof penetrations, a limited amount of open roof areas or low overhead clearance requiring more hand work. Situations include, but are not limited to rooftop penetrations like: soil stacks, sky lights, roof drains, exhaust vents, HVAC equipment, etc. or rooftop obstructions such as: pipes, duct work, electrical wires, hoses or raised equipment, etc.

MULTIPLIER - CLEARENCE RESTRICTIONS REQUIRE WORKING FROM KNEE-LEVEL OR BELOW (APPLIES TO

ONLY THE EFFECTED ROOF AREA)
Multiplier is applied when labor production is effected by height restrictions. Situations that can cause low overhead clearance requiring more hand work include, but are not limited to rooftop equipment.

MULTIPLIER - ROOF HEIGHT IS GREATER THAN 20 FT, BUT LESS THAN OR EQUAL TO 50 FT STORIES Multiplier is applied when labor production is effected by the roof height. This multiplier applies to roof heights that exceed an estimated 2 stories, but are less than or equal to an estimated 5 stories. Additional roof height can require increased safety requirements, larger lift equipment, tie-offs, etc.

MULTIPLIER - ROOF HEIGHT IS GREATER THAN 50 FT, BUT LESS THAN OR EQUAL TO 100 FT Multiplier is applied when labor production is effected by the roof height. This multiplier applies to roof heights that exceed an estimated 5 stories, but are less than or equal to an estimated 10 stories. Additional roof height can require increased safety requirements, larger crane equipment, tie-offs, etc.

Page 39 of 50 ends

Addendum 1 - Pa Page 666ge 55 of 66

22.10 %

22.11 22.12 %

22.13 %

22.14 %

22.15 %

22.16 %

22.17 %

22.18 %

22.19 %

22.20 %

22.21 %

22.22 %

22.23 %

22.24 %

22.25 %
MULTIPLIER - ROOF HEIGHT IS GREATER THAN 100 FT
Multiplier is applied when labor production is effected by the roof height. This multiplier applies to roof heights that exceed an estimated 10 stories. Additional roof height can require increased safety requirements, larger crane equipment, tie-offs, etc.

MULTIPLIER - WALL COATING, MASONRY REPAIRS OR WATERPROOFING REQUIRES A SWING STAGE Multiplier is applied when labor production is effected by the requirement to use a swing stage. This multiplier applies to wall coatings, masonry repairs or waterproofing work that requires the use of a swing stage.

MULTIPLIER - ROOF IS CONSIDERED NON-STANDARD ARCHITECTURE Multiplier is applied when labor production is effected because the roof area is not a box- or rectangular-shaped.

Situations considered to be non-standard architecture can include, but are not limited roof areas that contains sharp angles and/or curves, have multiple roof area dividers or expansion joints, long and narrow MULTIPLIER - ROOF HAS GREATER THAN 4/12 SLOPE
Multiplier is applied when Roof Area has a Greater than 4/12 Slope, Steeper slope reduces overall labor production and requires additional safety precautions.

MULTIPLIER - ROOF HAS GREATER THAN 8/12 SLOPE
Multiplier is applied when Roof Area has a Greater than 8/12 Slope; Very steep slopes have a greater impact on overall labor production and require additional safety precautions.

MULTIPLIER - ROOF SIZE IS LESS THAN 500 SF
Multiplier is applied when Roof Size is less than 500 SF. Situation creates the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs
MULTIPLIER - ROOF SIZE IS GREATER THAN 30,000 SF, BUT LESS THAN 50,000 SF Multiplier is applied when Roof Size is greater than 30,000 SF, but less than 50,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a larger than average roof area resulting in fixed costs being a lower portion of the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 50,000 SF, BUT LESS THAN 100,000 SF Multiplier is applied when Roof Size is greater than 50,000 SF, but less than 100,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a large roof area resulting in fixed costs being a small impact on the overall job costs
MULTIPLIER - ROOF SIZE IS GREATER THAN 100,000 SF, BUT LESS THAN 200,000 SF Multiplier is applied when Roof Size is greater than 100,000 SF, but less than 200,000 SF. Situation creates the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across larger roof area resulting in fixed costs being a slight impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 200,000 SF
Multiplier is applied when Roof Size is greater than 200,000 SF. Situation creates the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across very large roof area resulting in fixed costs being a minimal impact on the overall job costs
MULTIPLIER - ROOF SIZE IS GREATER THAN 500 SF, BUT LESS THAN 1,000 SF Multiplier is applied when Roof Size is greater than 500 SF, but less than 1,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 1,000 SF, BUT LESS THAN 2,000 SF Multiplier is applied when Roof Size is greater than 1,000 SF, but less than 2,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 2,000 SF, BUT LESS THAN 3,000 SF Multiplier is applied when Roof Size is greater than 2,000 SF, but less than 3,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a very small roof area resulting in fixed costs having a significant impact on the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 3,000 SF, BUT LESS THAN 5,000 SF Multiplier is applied when Roof Size is greater than 3,000 SF, but less than 5,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a smaller roof area resulting in fixed costs being a larger portion of the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 5,000 SF, BUT LESS THAN 10,000 SF Multiplier is applied when Roof Size is greater than 5,000 SF, but less than 10,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a smaller roof area resulting in fixed costs being a larger portion of the overall job costs MULTIPLIER - ROOF SIZE IS GREATER THAN 10,000 SF, BUT LESS THAN 20,000 SF Multiplier is applied when Roof Size is greater than 10,000 SF, but less than 20,000 SF. Situation creates the fixed costs:
equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across more of an average roof area resulting in fixed costs being a slightly larger portion of the overall job costs

Page 40 of 50 ends

Addendum 1 - Pa Page 667ge 56 of 66
Cleaning & Caulking

23.01 Pressure Wash to Clean Horizontal Surfaces SF

23.02 Pressure Wash to Clean Vertical Surfaces SF

23.03 Pressure Wash with TSP or Simple Green to Clean Horizontal Surfaces SF

23.04 Pressure Wash with TSP or Simple Green to Clean Vertical Surfaces SF

23.05 Use a Brush to Wash Surface with TSP or Simple Green to Clean Horizontal Surfaces SF

23.06 Use a Brush to Wash Surface with TSP or Simple Green to Clean Vertical Surfaces SF

23.07 Prime Existing Asphalt-Based Roof Surface SF

23.08 Blow-Off Surface Area with Portable Blower to Remove Moisture SF

23.09 Spud and Scrape Aggregate from Roof Surface Asphalt BUR (Size Reference: 100' X 12") SF

23.10 Spud and Scrape of Aggregate from Roof Surface Coal Tar BUR (Size Reference: 100' X 12") SF

23.11 Remove & Dispose Loose Aggregate from Roof Surface (Wet Vac) SF

23.12 Power Broom Roof Surface SF

23.13 Remove & Dispose Ballast from Roof Surface SF

23.14 Remove & Dispose Ballast from Roof Surface at Approved Disposal Site SF

23.15 Remove Ballast from Roof Surface & Save for Reuse SF

23.16 Scrape / Sand Loose Paint from Exterior Building Surfaces and Clean-Up Debris SF

23.17 Sandblasting Paint from Exterior Building Surfaces and Re-Claim Sand SF

23.18 Apply Coating (Paint) to Horizontal Surface SF

23.19 Apply Coating (Paint) to Vertical Surface SF

23.20 Caulking: Remove Existing Caulking & Clean and Prime Joint LF

23.21 Install Backer Rod in Properly Prepared Opening, Polyethylene - 3/8” Diameter LF

23.22 Install Backer Rod in Properly Prepared Opening, Polyethylene - 1/2” Diameter LF

23.23 Install Backer Rod in Properly Prepared Opening, Polyethylene - 3/4” Diameter LF

23.24 Install Backer Rod in Properly Prepared Opening, Polyethylene - 1” Diameter LF Masonry section UNIT $ per Unit

23.25 Remove and Reset Bricks; 1-50 SF SF

23.26 Remove and Reset Bricks; Over 50 SF SF

23.27 Remove and Reset Blocks SF

23.28 Remove and Reset Coping Stones Each

23.29 Remove Bricks, Blocks, Coping Stones; 1-50 SF SF

23.30 Remove Bricks, Blocks, Coping Stones; Over 50 SF SF Brick, block and brick exterior wall maintenance, repair and application of protective coatings. UNIT $ per Unit

23.31 Selective Demolition of Concrete Block Masonry Units (CMU) with perimeter saw cutting- swing stage 4”, 6” and 8” block (high-rise) Each

23.32 Selective Demolition of Brick Masonry Units with perimeter saw cutting SF Selective Demolition of Mortar Joint with Perimeter Saw cutting UNIT $ per Unit

23.33 Removal of existing mortar ( ½” wide by ¾” depth) SF

23.34 Removal of existing mortar (¾” wide by ¾” depth) SF

23.35 Removal of existing mortar (½” wide by 1½” depth) SF

23.36 Removal of existing mortar (¾” wide by 1½” depth) SF New Pointing Work UNIT $ per Unit

23.37 Furnish and install new mortar (½” wide by ¾” depth) SF

23.38 Furnish and install new mortar (¾” wide by ¾” depth) SF

23.39 Furnish and install new mortar (½” wide by 1 ½” depth) SF

23.40 Furnish and install new mortar (¾” wide by 1 ½” depth) SF Removal of Roof Parapets UNIT $ per Unit

23.41 Removal of parapet wall (24” high) SF

23.42 Removal of parapet wall (42” high) SF

23.43 Removal of parapet wall (24” high) SF

23.44 Removal of parapet wall (42” high) SF
Reconstruction of Brick Masonry Roof Parapets UNIT $ per Unit

23.45 New brick masonry parapet w/stone coping and flashings (24” high) SF

23.46 New brick masonry parapet w/stone coping and flashings (42” high) SF

23.47 New brick masonry parapet w/stone coping and flashings (24” high) SF

23.48 New brick masonry parapet w/stone coping and flashings (42” high) SF New Through wall Flashings UNIT $ per Unit

23.49 Removal of 4 courses brick wall w/Temporary Shoring SF

23.50 Removal and replacement of steel lintel SF

23.51 Furnish and install new flashings (Bituthane) SF

23.52 Furnish and install new flashings (Lead coated copper) SF

Page 41 of 50 ends

Addendum 1 - Pa Page 668ge 57 of 66

23.53 Furnish and Install New Brick Masonry w/Weep Holes and Screens SF

23.54 Parging and waterproofing of back-up wall SF
Roof Coping Stones. UNIT $ per Unit

23.55 Removal of existing roof coping stones (16 inches) SF

23.56 Removal and parging of existing substrate SF

23.57 Furnish and install new lead coated copper flashings SF

23.58 Drilling and epoxy grouting stainless steel pins SF

23.59 Reinstallation of existing stones with cleaning SF

23.60 Furnish and install new coping stones SF

23.61 Furnish and install new sealants between coping stones. SF

23.62 Cleaning and coating of existing stones. SF
CMU Backup Wall Repair and Waterproofing. UNIT $ per Unit

23.63 Replacement of Deteriorated CMU Back-up SF

23.64 Parging of CMU back-up wall SF

23.65 Waterproofing of back-up wall SF
Crack Repair UNIT $ per Unit

23.66 Drill and install new stainless steel pins. Each

23.67 Grouting of open cracks SF

23.68 Replacement of cracked bricks SF
New Concrete and Coating UNIT $ per Unit

23.69 Placement of new high strength patching mortar (2” depth) SF

23.70 Placement of new high strength patching mortar (3.5” depth). SF

23.71 Cleaning and coating of concrete surface. SF

23.72 Sidewalk Bridging. SF

23.73 Temporary Roof Protection SF
Roof Drainage, Scuppers, Stacks, Curbs and Pitch Pockets UNIT $ per Unit

23.74 Install & Connect new 4" roof drain & Flashing; Excluding Plumbing EA

23.75 Install & Connect new 6" roof drain & Flashing; Excluding Plumbing EA

23.76 Install & Connect new 8" roof drain & Flashing; Excluding Plumbing EA

23.77 Pitch pocket, 24 gauge, GI, 12” x 12”, with storm collar, hemmed to outside, soldered corners and seams EA

23.78 Pitch pocket, 24 gauge, GI, 6” x 6”, with storm collar hemmed to outside, soldered corners and seams EA

23.79 Pitch pocket, 24 gauge, GI, 8” x 8”, with storm collar, hemmed to outside, soldered corners and seams EA

23.80 Plumbing stack, 16 oz. copper flashing EA

23.81 Plumbing stack, 24 gad Zinc flashing EA

23.82 Plumbing stack, 4# lead flashing EA

23.83 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 12" Straight EA

23.84 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 2" Corners EA

23.85 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 3" Kit EA

23.86 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 5" Kit EA

23.87 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 5" Rounds EA

23.88 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 6" Kit EA

23.89 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 6" Straight EA

23.90 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 7.5" Kit EA

23.91 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 7.5" Kit with 2-Part Filler EA

23.92 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 7.5" Rounds EA

23.93 Pre-Cast Molded Pitch Pan (e.g. Chemcurb) - 9" Kit EA

23.94 Installation of Roof Curbs 2" X 4" LF

23.95 Installation of Roof Curbs 2" X 6" LF

23.96 Installation of Roof Curbs 2" X 8" LF

23.97 Installation of Coping/Edge Nailers 2" X 4" LF

23.98 Installation of Coping/Edge Nailers 2" X 6" LF

23.99 Installation of Coping/Edge Nailers 2" X 8" LF

23.100 Installation of Coping/Edge Nailers 2" X 10" LF

23.101 Installation of Coping/Edge Nailers 2" X 12" LF

23.102 Installation of Coping/Edge Nailers 2" X 14" LF

23.103 Installation of Coping/Edge Nailers 2" X 16" LF

23.104 Provide a cast iron drain strainer EA

23.105 Reflash existing roof drain EA

23.106 Scupper, .050 Aluminum, match existing configuration LF

Page 42 of 50 ends

Addendum 1 - Pa Page 669ge 58 of 66

23.107 Scupper, 16 oz Copper, match existing configuration LF

23.108 Scupper, 20 gad Stainless Steel, match existing configuration LF

23.109 Sleeper Cap - 24 Gad Galvanized LF
Roof Accessories UNIT $ per Unit

23.110 Walkway Pads

23.111 30" wide roll goods, tape attached EA

23.112 30" wide roll, hot asphalt attached EA

23.113 30" wide roll, adhesive attached EA

23.114 Expansion joint, butyl or neoprene bellows, galvanized flange LF

23.115 Roof ladder, security ladder guard EA

23.116 Roof ladder, steel, bolted to concrete, 20 feet and up, with cage; with intermediate landings as required by Code EA

23.117 Roof ladder, steel, bolted to concrete, up to 20 feet, without cage EA

23.118 Roof ventilators EA

23.119 Termination bar, aluminum, 1/4” x 1” LF
Common Roof Repair Items UNIT $ per Unit

23.120 3-Course Application; Mastic-Mesh-Mastic; 15" Wide Total; 12" Wide Mesh LF

23.121 3-Course Application; Mastic-Mesh-Mastic; 9" Wide Total; 6" Wide Mesh LF

23.122 3-Course Application; Urethane-Reinforcement-Urethane (< 500 SF) SF

23.123 3-Course Application; Urethane-Reinforcement-Urethane (> 500 SF) SF

23.124 Install Self-Adhering Cap Sheet Over Repair Area (< 500 SF) SF

23.125 Install Self-Adhering Cap Sheet Over Repair Area (> 500 SF) SF

23.126 Torch Cap Sheet Over Repair Area (< 500 SF) SF

23.127 Torch Cap Sheet Over Repair Area (> 500 SF) SF

23.128 Set Roofing Cap Sheet Membrane in Mastic Installed Over Repair Area (< 500 SF) SF

23.129 Set Roofing Cap Sheet Membrane in Mastic Installed Over Repair Area (> 500 SF) SF Leak Response & Preventive Maintenance UNIT $ per Unit

23.153 Leak Response Work Order Tracking & Dispatch EA

23.154 Leak Response Completion Report with Back-Up EA

23.155 Preventive Maintenance (Single Campus - All Roof Sections) SF

23.156 Preventive Maintenance (Multiple Campuses City-/County-wide - All Roof Sections) SF

23.157 Preventive Maintenance (Multiple Campuses State-wide - All Roof Sections) SF

23.155 Preventive Maintenance Performed Concurrent with Visual Inspection (Single Campus - All Roof Sections) SF

23.156 Preventive Maintenance Performed Concurrent with Visual Inspection (Multiple Campuses City- /County-wide - All Roof Sections) SF

23.157 Preventive Maintenance Performed Concurrent with Visual Inspection (Multiple Campuses State-wide - All Roof Sections) SF

23.158 Preventive Maitenance Completion Report with Back-Up EA Equipment UNIT $ per Unit

23.159 Folklift/Manlift Equipment Rental DAY

23.160 Crane Equipment Rental - up to 80' DAY

23.161 Crane Equipment Rental - up to 150' DAY

23.162 Manlift per day DAY

23.163 Skytrack DAY

23.164 Additional Equipment (rental) % off published price % Other Services UNIT $ per Unit

23.165 Demobilization - Pre-Planned or Additional Un-planned EA

23.166 Remobilization - Pre-Planned or Additional Un-planned EA Additional repair options UNIT $ per Unit

23.167
Option 1: Cost of Quote Plus Mark-Up (Used when repair and installation services line item pricing is not available and services performed are to be performed by a contractor. Requires a quote on corporate letterhead that cannot exceed $25,000)
Cost plus added to quote
%

23.168
Option 2: R.S. Means or Gordian Group Catalog (Used when repair and installation services line item pricing is not available)
Cost plus added to catalog pricing
%
Catalog Pricing UNIT $ per Unit

23.169 Please provide a price list with your complete material catalog(s) - A manufacturers catalog can be used. You may provide a net-price or a catalog with a discount.

Green Roofing UNIT $ per Unit

Page 43 of 50 ends

Addendum 1 - Pa Page 670ge 59 of 66

23.170 Please provide your green environmentally friendly roofing options, please provide as much information as possible to include line items necessary to complete a green roof

Page 44 of 50 ends

Addendum 1 - Pa Page 671ge 60 of 66
Aluminum
Size / Gauge .032 .040 .050 .063
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend
Sheet Metal Accessories Covered Under these Pricing Tables:
-Drip Edge
-Gravel Stop
-Gutters, Straps, Hangers & Fasteners
-Coping
-Surface Mounted Counter Flashing
-Reglet Mounted Counter Flashing
-Skirt Flashing
-Expansion Joints
-Miscellaneous Metal Fabricated Details

Page 45 of 50 ends

Addendum 1 - Pa Page 672ge 61 of 66
Stainless Steel & Copper
SS SS Copper Copper
24 Ga 26 Ga 16 oz 20 oz
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend
Size / Gauge / Thickness

Page 46 of 50 ends

Addendum 1 - Pa Page 673ge 62 of 66
Kynar Coated Steel
Size / Gauge 16 Ga 20 Ga 22 Ga 24 Ga
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend

Page 47 of 50 ends

Addendum 1 - Pa Page 674ge 63 of 66
Galvanized Steel
Size / Gauge 16 Ga 20 Ga 22 Ga 24 Ga
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
Price Per Bend

Page 48 of 50 ends

Addendum 1 - Pa Page 675ge 64 of 66
Caulking Chart pricing per Linear Foot Installed
2 Component Epoxied Urethane Compound
Joint Size 1/8" 3/16" 1/4" 5/16" 3/18" 7/16" 1/2" 5/8" 3/4" 7/8" 1" 1-1/8" 1-1/4" 1/8"
3/16"
1/4"
5/16"
3/18"
7/16"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1-1/4"
Caulking Chart pricing per Linear Foot Installed
1 Component Polyurethane
Joint Size 1/8" 3/16" 1/4" 5/16" 3/18" 7/16" 1/2" 5/8" 3/4" 7/8" 1" 1-1/8" 1-1/4" 1/8"
3/16"
1/4"
5/16"
3/18"
7/16"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1-1/4"
Caulking Chart pricing per Linear Foot Installed
1 Component Silicone Rubber
Joint Size 1/8" 3/16" 1/4" 5/16" 3/18" 7/16" 1/2" 5/8" 3/4" 7/8" 1" 1-1/8" 1-1/4" 1/8"
3/16"
1/4"
5/16"
3/18"
7/16"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1-1/4"

Page 49 of 50 ends

Addendum 1 - Pa Page 676ge 65 of 66
Journeyman
Prevailing
Wage
Rate Roofer Mason Sheet Metal
$10.00
$12.50
$15.00
$17.50
$20.00
$22.50
$25.00
$27.50
$30.00
$32.50
$35.00
$37.50
$40.00
$42.50
$45.00
$47.50
$50.00
$52.50
$55.00
$57.50
$60.00
$62.50
$65.00
$67.50
$70.00
$72.50
$75.00
$77.50
$80.00
$82.50
$85.00
$87.50
$90.00
$92.50
$95.00
$97.50
$100.00
$102.50
$105.00
$107.50
$110.00
$112.50
$115.00
$117.50
$120.00
Line Item Multiplier to Adjust Labor Costs Based Upon the Prevailing Wage Rate. Prevailing wage found at http://www.wdol.gov/dba.aspx#0
Multiplier
for Prevailing
Wage Rates

Page 50 of 50 ends

Addendum 1 - Pa Page 677ge 66 of 66
IFB Notification List - PW1925 Roofing Supplies and Services, Waterproofing and Related Product and Services First Name Last Name Company/Account EmailDonnie McDaniel Acumen Enterprises, Inc. [email protected] Brian D'Amico All Pro Roofing & Consulting LLC [email protected] Helgemoe BluSky Restoration Contractors, LLC [email protected] Craig Miller CentiMark Roofing [email protected] Wood Damschroder Roofing Inc. [email protected] Hallmark DENCO Construction Services [email protected] Willison Gallant Services, LLC [email protected] Darrell Wallin Harness Roofing Inc. [email protected] Corso Joeris General Contractors, Ltd. [email protected] Stone Johns Manville [email protected] Jake Efinger Jolly Roofing & Contracting Co,. Inc. [email protected] Hubbard MDI General Contractors [email protected] Molitor Molitor Enterprises [email protected] Stephen Jeffreys Nationwide Protective Coating Mfrs., Inc [email protected] Satterfield Nova Tuff Coatings [email protected] Rodriguez Roofing Standards [email protected] Steavens SL King and Associates [email protected] JON SARCITA SOURCE RITE INC [email protected] Miller II Southland Coatings Technologies [email protected] Ellerbe Sun Valley Solar Solutions [email protected] Orlacchio The Garland Company, Inc. [email protected] Frank Percaciante The Garland Company, Inc. [email protected] McDermott The Garland Company, Inc. [email protected] Tucker Tucker Roofing Systems, LLC. [email protected] Marcelle V&R Roofing [email protected] Green Vertex Roofing, LLC [email protected] Wells WEN Services [email protected] Williams Western Specialty Contractors [email protected] Racine County_Roofing Supplies and Services_NFL

Page 678 ends
Page 679 ends
Page 680 ends
Page 681 ends
Page 682 ends
Page 683 ends
Page 684 ends
Page 685 ends
Page 686 ends
Page 687 ends
Page 688 ends
Page 689 ends
Page 690 ends
Page 691 ends
Page 692 ends
Page 693 ends
Page 694 ends
Page 695 ends
Page 696 ends
Page 697 ends

Date: 08/07/2019
Adnum: 376632
Custid: 69764

ADVERTISING PROOF
Customer: PHASE 3 MARKETING & COMM.

Ad Title: Roofing Supplies and Services
Lines: 37
^STARTAD^376632^
Racine County,
Wisconsin
Roofing Supplies
and Services
Bid Date: Sept. 9
Racine County, Wisconsin
is requesting sealed bids from
qualified contractors to provide
Roofing Supplies and Services,
Waterproofing, and Related
Products and Services (IFB No.

PW1908). In order to be considered, the Bidder must complete and submit a sealed bid to Racine County Courthouse,
730 Wisconsin Avenue, Racine,
Wisconsin 53403-1238 in accordance with the solicitation documentation available at https:// racinecounty.com/doing-business/
purchasing-rfps-and-bids or from
the Purchasing office.

NON-MANDATORY PREBID CONFERENCE: Thursday,
August 15, 2019, 9:00 am CT,
1st floor conference room at
Racine County Courthouse, 730
Wisconsin Avenue, Racine, WI.

BID DUE DATE: September
9, 2019 BEFORE 2:00 PM CT.

CONTACT: Duane McKinney,
Purchasing Coordinator, 262-636-
3700 or Duane.McKinney@racinecounty.com.

Date of publication in
the Seattle Daily Journal of
Commerce, August 8, 2019.
^ENDAD^376632^ 8/8(376632) ^THE-END^
Date: 08/07/2019
Adnum: 376632
Custid: 69764

ADVERTISING PROOF
Customer: PHASE 3 MARKETING & COMM.

Ad Title: Roofing Supplies and Services
Lines: 37
6WDWHRI:DVKLQJWRQ.LQJ&RXQW\

Page 698 ends
Page 699 ends
Page 700 ends

LIFE USA TODAY ❚ MONDAY, AUGUST 12, 2019 ❚ 5D
LOS ANGELES – Audiences helped
the “Fast & Furious” spinoff “Hobbs &
Shaw” take another lap at No. 1, even
with an onslaught of four new major
releases this weekend.

From family films to R-rated adult
fare, moviegoers had their pick as studios tried to capitalize on the waning days of summer. But although August
can be a great opportunity for nonsuperhero films, it’s not a sure thing.

And some, such as “Scary Stories to Tell
in the Dark,” fared better than others,
such as the Melissa McCarthy and Tiffany Haddish Mob thriller “The Kitchen.” “There are always going to be casualties when there are this many,” says Paul Dergarabedian, senior media analyst for box-office tracker Comscore. “They cannot always be lined up in the
top four rankings.”
According to studio estimates Sunday, Dwayne Johnson and Jason Statham’s “Hobbs & Shaw” fell 58% from its first weekend but added $25.4 million
from North American theaters. It has
now grossed $108.5 million domestically and $332.6 million worldwide.

Second place went to the Guillermo
del Toro-produced PG-13 horror film
“Scary Stories,” with a better-than-expected $20.8 million.

Close behind in third was “The Lion
King” with $20 million in its fifth weekend in theaters. With $1.3 billion globally, it has now surpassed “Beauty and the Beast” as Disney’s highest-grossing
live-action release.

Newcomer “Dora and the Lost City of
Gold” found a healthy audience, too,
earning an estimated $17 million for a
fourth-place start. In fifth place, Quentin Tarantino’s star vehicle “Once Upon A Time in Hollywood” added $11.6 million and crossed the $100 million mark (with $100.3 million).

But not all the newcomers were so
lucky. The dog-owner tearjerker “The
Art of Racing in the Rain,” with Milo
Ventimiglia, opened in sixth place with
$8.1 million. And the ’70s-set “The
Kitchen” flopped with only $5.5 million.

Audiences also had a slew of new
limited releases from which to choose:

The BTS concert film “Bring the Soul:

The Movie” ($2.3 million); “Brian
Banks,” based on the real story of a false
accusation that upends a promising
football star’s life ($2.1 million); “The
Peanut Butter Falcon,” with Shia LaBeouf and Dakota Johnson ($205,236); and “After the Wedding,” with Michelle
Williams and Julianne Moore ($57,124).

Final numbers are expected Monday.

Contributing: Kim Willis
MOVIES
‘Scary’ frightens ‘Hobbs & Shaw’ for 2nd
Lindsey Bahr
The Associated Press
Deckard Shaw (Jason Statham, left)
and Luke Hobbs (Dwayne Johnson)
face a genetically enhanced villain in
“Hobbs & Shaw.”

DANIEL SMITH/UNIVERSAL PICTURES
To view more Classified listings,
visit: www.classifieds.usatoday.com

MARKETPLACE

BUSINESS

BUSINESS

MARKETPLACE

MARKETPLACE

BUSINESS

OPPORTUNITIES

BUILDING PRODUCTS / SUPPLIES

REAL ESTATE

TIMESHARE

INVESTMENT PROPERTY
Exchange my 3 bdrm, 2bth
timeshare week (3rd wk in April)
located @Lake Buena Vista, FL
(minutes from Disney World)
for an early model SUV (seats 7).

No exchange: $50K CASH…..
includes all fees.

Easy transfer: documents for
deed transfer provided;
$250 transfer fee;
admin assistance provided by
owner services; - SUV title free.

Worldwide resort exchange
privileges…. serious inquiries only.

CONTACT:

[email protected]

BOOKS/PUBLICATIONS
STUDY THE BIBLE For FREE 8-lesson course
Church of Christ, Box 8453, Falls
Church, VA 22041 888-949-2176
www.gracewords.org

INVESTMENTS
BUSINESS FOR SALE 40% APR, P&I PD MONTHLY
INSURED COLLATERALIZED $4000.

PER INVESTMENT

MULTIPLE AVL, REGULATION D FILING
985-630-6485
CasCade 5000 1hp Floating POND FOUNTAIN! Aerator
Now Available Factory Direct!
MSRP ($1400) You Pay $798.95! Complete with light & timer, 100ft power cord, 1 yr warranty!
Fast UPS shipping right to your door!
Call: 7 days/week (608) 254-2735
WWW.FISHPONDAERATOR.COM
Pre-Assembled
-Installs in Minutes!
Elegance &
Improved Water Quality
Seeking to buy 10,000 tons
Cu Sheet & Strip 0.15mm-5mm thick
Brass Sheet & Strip 0.15mm min thick
Cu Sheet & Strip 0.15mm min thick
Bronze Sheet & Strip 0.15mm - 5mm thick
Cu-Ni Sheet & Strip (Ni Zinc) 0.15mm min thick
Cu Alloy Other Sheet & Strip 0.15mm -
5mm thickness, 500mm max width
Cannot be of EU or China origin
Contact [email protected] 574.753.0471
WANTED
GET RICH as the demand for GOLD soars!
Fabulous plan gets you GOLD
and SILVER for 40 cents on
the dollar! Reliable Company.
800-662-0768
ID B-171193
TRAVEL

SPECIAL ATTRACTIONS

1.855.60 (YACHT) 92248
www.saveene.com
• Stunning 4 Cabin + Crew Quarters
• Ideal for overnight and Bahamas
• Impress your family, friends,
and business partners • 5%-95% based on true usage
• Fully crewed • Ideal tax shelter
S. Florida Fractional
Yachts From $19,995
Established
Assisted Living Profitable, 62 Beds
Maryland
Possible 80% Financing with 10% Down
10% Discount
561-523-1149

NOTICES

PUBLIC NOTICE
Racine County, Wisconsin is requesting sealed bids
from qualified contractors to provide
Roofing Supplies and Services, Waterproofing,
and Related Products and Services (IFB No. PW1908).

In order to be considered, the Bidder must complete and submit a sealed bid to Racine County Courthouse, 730
Wisconsin Avenue, Racine, Wisconsin 53403-1238 in
accordance with the solicitation documentation available at https://racinecounty.com/doing-business/purchasingrfps-and-bids or from the Purchasing office.

NON-MANDATORY PRE-BID CONFERENCE:

Thursday, August 15, 2019, 9:00 am CT,
1st floor conference room at Racine County Courthouse,
730 Wisconsin Avenue, Racine, WI.

BID DUE DATE: September 9, 2019 BEFORE 2:00 PM CT.

CONTACT: Duane McKinney, Purchasing Coordinator,
262-636-3700 or [email protected].
©WIGGLES 3D GAMES DON’T QUOTE ME®
Journalist Bill Moyers Rearrange the words to complete the quote. shares this thought. DEMOCRACY LIBRARY MATTER OPEN SHAPE TOO WHEN ________A ___________ IS ________, NO ___________ ITS SIZE OR ___________, ______________ IS OPEN, ________. 8/12
Friday’s Answer: “Facts do not cease to exist because
they are being ignored.” - Aldous Huxley

TXTPERT
Across

1. 3282

4. 477

5. 2983

7. 365337

10. 665463
Down

1. 383

2. 822

3. 34353

6. 2564

7. 3453

8. 5465

9. 726
8/12
Today’s theme
Computers
Use the
phone
keypad to
decode the
clues.

For example:
2 could be A,
B or C ... and
5678 could
be LOST
8/9
© USA TODAY and Rich Coulter Friday’s solution
12 3
4 5
6 78 9
10 D
1 IALT 2ON3E
E V E
C
4 AL L W
I G
5 A
6 SP 7
P
8 OS 9T D A
H E N
E N C
10 OD E
R D
11 VD L
ACROSS
1 Like a wrung-out
towel
5 Brazilian
“superfood” berry
9 Enjoy a claro
14 Sandusky’s lake
15 Thin out, as a herd
16 Removed the rind
from
17 Cerebellum bit
19 Cara of “Fame”
20 One taking first
steps
21 Platform for Siri
22 Texas Ranger’s
topper
24 Okefenokee and
others
26 Mahershala of
“Moonlight”
27 On edge
31 Bay Area wine
valley
35 Richly colored
garden flower
38 Oxford or brogan
39 Cereal brand since
1937
40 Australia’s national
gem
41 Gold Medal
product
42 Like a Mantle
rookie card
43 “Beloved” author
Morrison
44 Discounted by
45 Afghanistan’s
largest city
46 Bridge measure
47 “Bad Boy” singer
Gloria
49 Michael on
“Weekend Update”
51 Venues for
pucksters
55 “Sure, why not?”
59 Quick point in tennis
60 Many a Neruda
work
61 Name in kitchen
wrap, once
62 Workers on a flight
65 Network for hoops
fans
66 Jessica of “Sin City”
67 Hoedown seat,
perhaps
68 Griffin of “Suddenly
Susan”
69 Not fictitious
70 Place to store a tiller
DOWN
1 Entries in red
2 ONE WAY sign,
essentially 3 Mazda roadster
4 Architect who died
at 102
5 Grab by the collar,
say
6 Snooker players’
sticks
7 Hog’s share,
perhaps
8 Pandora’s boxful
9 Pitchman’s pitch
10 “Frasier” father
11 Many “-ite” minerals
12 Number-picking
game
13 Scene of temptation
18 A bit chilly
23 Hash ingredient,
slangily
25 Fabric used in
48-Down care
28 Dots in the ocean
29 Visitor to Scrooge
30 Provide quarters for
32 Captain with a
whalebone leg
33 Cuzco’s land
34 Jump with a spin
35 Lobster
catchers
36 Each,
informally
37 “Peter Pan”
dog
41 Admiral’s
charge
45 Second lady
Pence
48 Mud pack, e.g.
50 Hard to lift
52 News anchor
O’Donnell of
64-Down
53 One-named
singer in the
Guinness Book
54 Mended, as socks
55 Extract, as a tooth
56 “Luther” star Idris
57 “Beat it!”
58 Surgery aftermath
59 Palindromic pop
group
63 Pub order
64 “Criminal Minds”
network
Answers: Call 1-900-988-8300, 99 cents a minute; or, with a credit card, 1-800-320-4280.

BUSINESS
CENTER

CROSSWORD
BY Zhouqin Burnikel
Friday’s Answer
8/9
© Andrews McMeel 8/12

CROSSWORDS ON YOUR PHONE
get our crossword app
EDITED Fred Piscop
DIFFICULTY RATING ✮✩✩✩✩
Complete the grid so that every row, column and 3x3
box contains the numbers 1 through 9 (no repeats).
8/12
8/9

SUDOKU FUSION
ON YOUR PHONE puzzles.usatoday.com
Complete the grid so that every row, column and 3x2
box contains the numbers 1 through 6 (no repeats).

DIFFICULTY RATING ✮✩✩✩✩
38 19 47
1 6 72
97 8 1
4 36 5 8
25 5 978 3
35 98
86 7 4
41 92 35
1 2 43
36 14 32
63 5 1
13 32 5 6
4932 1 6758
2653784 19
87 1 459362
534867921
62954 1 873
1 8 7 9 3 2 546
7 5 6 1 9 3 2 84
948625 1 37
3 1 2 784695
6345 2 1
2 1 5436
143652
5263 14
45 2 1 63
36 1 2 45
Friday’s Answers
SUDOKU
© Andrews McMeel

QUICKCROSS
By JohnWilmes 8/12
Volcanic output
Foreboding sign
Give off steam
Finishes
Adore
“So be it”
Sell
Certain carpenters
Friday’s Answer
8/9
WA L K
I RAN
L INE

DADE QUICKCROSS
ON YOUR PHONE puzzles.usatoday.com
© Andrews McMeel
QUIET

1. 2.

3. 4.

5. 6.

7. PLAY ONLINE
PUZZLES.USATODAY.COM

UP & DOWN WORDS
By David L. Hoyt and Russell L. Hoyt

1. Umpire’s shout

2. “Take Me Out to the ____ ____”

3. “Bring it!”

4. Available

5. Request; summon

6. Permanently

7. Remains silent
Clues: Friday’s Answer

GENETIC
CODE
BLUE
BLOOD
COUNT
ON
MARS
CODE
BLUE
BLOOD
COUNT
ON
MARS

ATTACKS
PLAY
8/12
© Andrews McMeel

AO J H P THH T T X X

CPX I YPGE R LAE

MP E YNDG L L VO L

GAAXGX RAO I C F

N F T L L EWOM V U N

I G L C P Y N E GM EM

R RDAHHND S E A J

B E TAXKAXNTNL

WORD ROUNDUP
By David L. Hoyt and Jeff Knurek
Friday’s answer: SALMON SHARK SMELT SOLE / EUROPE AFRICA

ASIA / WRIST ANKLE KNEE / FRACTION GENEROUS / LIQUID
SOLID
8/12
Find and Circle:

Six four-letter words ending with X ☑☐☐☐☐☐ Three gases ☐☐☐ Boxing ____ ☐☐☐ First three Greek letters ☐☐☐ Direction of the sunset ☐ © Andrews McMeel
PUZZLES To report problems, email [email protected].

For more puzzles, get the USA TODAY Crossword app.

MULTIFAMILY INVESTMENT
OPPORTUNITY - NOI $692,000
Seeking buyer for Texas
multi-family apartment complex
with a swimming pool and
a mix of recently renovated 1
and 2-bedroom apartments.

Price: $10,500,000
130 Units. Cap Rate: 6.5%
95% Occupied
Email: [email protected]

IN SEARCH OF
Call to see if you qualify NOW:
800-208-3526 (24hrs)

TALCUM POWDER

WARNING
Users of Johnson and
Johnson’s Baby Powder
and Shower to Shower
may be at a higher risk of
developing ovarian cancer.

If you or a loved one used
talcum powder and were
diagnosed with ovarian
cancer, you may be entitled
to financial compensation.

Visit us online at: usatoday.com
800-509-1635

FORECLOSURE

DEFENSE HELPLINE ARE YOU BEHIND ON YOUR
MORTGAGE PAYMENTS?

COULD YOUR HOUSE GO INTO
FORECLOSURE? DOES IT SEEM

LIKE THE BANK HAS NO INTEREST

IN HELPING YOU SAVE YOUR

HOME AND YOU FEEL LIKE YOU
HAVE NOWHERE TO TURN?

THE FORECLOSURE DEFENSE

HELPLINE CAN HELP SAVE YOUR
HOME. IT’S CRITICAL THAT
YOU CALL US RIGHT NOW AT:

FINANCIAL SERVICES

DROWNING IN CREDIT CARD
DEBT? Struggling to make minimum payments
Owe $10,000 or more?
Call for our debt reset program!
CALL TODAY: 800-478-7009
Advertise Your Business Here!
To Advertise, Call: 1-800-397-0070
GET NOTICED! Advertise in USA TODAY’s
Marketplace Today Classifieds!
Call:1-800-397-0070
To advertise, call:
1-800-397-0070
Ad Number:Insertion Number:Size:Color Type:

USA0049922-04N/A0.768BW
Advertiser:Agency:Section-Page-Zone(s):Description:

USA TodayN/AD-5-AllMkpl Today cls Aug12 rev Monday, August 12, 2019

Page 701 ends

Racine County
Finance Department – Purchasing Division
Racine County Courthouse Duane McKinney
730 Wisconsin Avenue Purchasing Coordinator
Racine, WI 53403-1238
Phone (262) 636-3700
Fax (262) 636-3763
September 9, 2019
For the Record:

Let the record show that Racine County requested bids to:
provide Roofing Supplies and Services, Waterproofing and Related Product and Services.

A legal notice was placed in the Journal Times. Bids were accepted up until 2:00 pm on Monday, September 9, 2019 to be opened immediately thereafter in the office of the Purchasing Coordinator.

Let the record show that the following were present at the bid opening:

Frank Percaciante, Contract Manager, DBS/Garland.

Matthew McDermott, Marketing Director, The Garland Company Duane McKinney, Purchasing Coordinator
Let the record reflect that at 2:00 pm two (2) bids had been received. Bids were opened at 2:00 pm.

Bids were opened, read and recorded as follows:

CentiMark Corporation.
319 Industrial Drive, Franklin OH 45005
Signed by: Jeff Shepherd, Northern Group Director/Executive VP [email protected]
Garland/DBS, Inc.
3800 East 91st Street, Cleveland OH 44105
Signed by: Charles A. Ripepi, CFO
[email protected]
Following are the Bid Forms submitted by the above vendors. Copies of the bids submitted will be forwarded for review.

Sincerely,
Duane McKinney
Purchasing Coordinator

Page 702 ends
Page 703 ends
Page 704 ends
Page 705 ends
Page 706 ends
Page 707 ends

0XQLV&RQWUDFW
ප<HVƑ1R 6LJQHGE\YHQGRU
Ƒ<HVƑ1RƑ 'RFX6LJQ
&RQWUDFW7\SH Ƒ 1RQ(QFXPEHU([SHQVHƑ(QFXPEHU([SHQVHƑ+6'32([SHQVHƑ5HYHQXH 9HQGRU&XVWRPHU

'HSDUWPHQW
6XE'HSDUWPHQW

%ULHI'HVFULSWLRQRI6HUYLFHV

&RQWDFWDGPLQLVWUDWRU
&RQWDFW0XQLV,'

&RQWUDFW6WDUW

$FFRXQWV,QIRUPDWLRQ
<HDU
,IDGGLWLRQDODFFRXQWOLQHVDUHQHFHVVDU\DWWDFKDVFKHGXOH 7RWDO

+DYH\RXUHDGWKHDJUHHPHQW
 ප<HVƑ1R 'R\RXXQGHUVWDQG DJUHHZLWKWKH7HUPV ප<HVƑ1R
$UHWKHUHWKLQJVWKDW\RXWKLQNVKRXOGEHFKDQJHGLQWKLV&RQWUDFW  Ƒ <HVƑ1R
:DVDUHVROXWLRQSDVVHGWRDXWKRUL]HWKHRULJLQDOFRQWUDFW  Ƒ <HVƑ1R
,I\HVLQGLFDWHWKHUHVROXWLRQQXPEHU

DWWDFKDFRS\RIWKHUHVROXWLRQ

,VWKHUHDUHTXLUHGVLJQDWXUHGDWH
 Ƒ<HVƑ1R
&RUS&RXQVHO6WDPS
&RXQW\&OHUN6WDPS

5DFLQH&RXQW\&RQWUDFW &RQWUDFW$PHQGPHQW)RUP
$WWDFKRQHFRS\RIWKHFRQWUDFWWREHILOHG$WWDFKPRUHFRSLHVLIUHTXLUHGE\YHQGRU $PHQGPHQW

9HQGRU1DPH

)XOO$GGUHVV

&RQWUDFW(QG

,IWKLVLVDPXOWL\HDUFRQWUDFW&RPPLWWHHDQG&RXQW\%RDUGDXWKRUL]DWLRQLVQHHGHGEHIRUHWKHFRQWUDFWFDQEHSURFHVVHG %\FRPSOHWLQJWKLVIRUP3URFXUHPHQW3ROLF\KDVEHHQIROORZHG $FFRXQW1DPH
$FFRXQW1XPEHU $PHQGHG$PRXQW 1HZ&RQWUDFW$PRXQW

,I\HVSOHDVHDWWDFKDPHPRVWDWLQJWKHFKDQJHV\RXWKLQNVKRXOGEHPDGH ,I\HVZKDWGDWH

8SRQFRPSOHWHH[HFXWLRQRIWKLVFRQWUDFWDQRULJLQDOFRS\PXVWEHSODFHGRQILOHZLWKWKH&RXQW\&OHUNDORQJZLWKWKLVFRYHUVKHHW 7KLVIRUPLVWREHSULQWHGRQ3DVWHO<HOORZSDSHU 8SGDWHG %( 1718 ■
6557 GARLAND/DBS
3800 EAST 91ST ST CLEVELAND OH 44105

FINANCE
AMENDMENT 5 YEAR EXTENSION ROOFING SUPPLIES AND SERVICES Duane McKinney 6750dmckinne
10/15/2019 10/14/2029
13500000.400000
$ 0.00
■ ■





 




 

Page 708 ends

ROOFING SUPPLIES AND SERVICES, WATERPROOFING, AND RELATED PRODUCTS AND SERVICES CONTRACT 2019
AMENDMENT NO. ELEVEN (11)
This Amendment No. Eleven is effective December 15, 2023 and is to modify the ROOFING SUPPLIES AND SERVICES, WATERPROOFING, AND RELATED PRODUCTS AND SERVICES CONTRACT 2019 agreed upon by Racine County, Wisconsin, 730 Wisconsin Avenue, Racine, Wisconsin 53403 (“County”) and Garland/DBS, Inc. 3800 East 91st Street, Cleveland, Ohio 44105 (“Contractor”) (hereinafter each a “Party” and collectively referred to as “Parties”) on September 27, 2019 (“Contract”).

The Parties hereby agree to amend the Contract as follows:

TERM: The County is exercising the remaining renewal option for one (1) five (5) year term through October 14, 2029.

ALL OTHER PROVISIONS OF THE CONTRACT SHALL REMAIN IN THEIR ENTIRETY.

RACINE COUNTY
BY: _______________________
Jonathan Delagrave
Racine County Executive
DATE: _______________________
BY: _______________________
Wendy M. Christensen
Racine County Clerk
DATE: _______________________
GARLAND/DBS Inc.

BY: _______________________
DATE: _______________________





 




 






Page 709 ends

CITY OF FOUNTAIN VALLEY

CITY COUNCIL

COUNCIL ACTION REQUEST
To: Honorable Mayor and Agenda Date: April 7, 2026
Members of the City Council
SUBJECT: Request Approval to Renew a Five-Year Agreement with Orange County Animal Care for the Continued Provision of Animal Care and Control Services Three-Year Strategic Goals
☒ Enhance the culture and environment of “A Nice Place to Live” ☐ Attract and retain revenue producing businesses
☐ Achieve fiscal stability in accordance with the 20-Year Financial Plan ☐ Attract and retain quality staff
☐ Not applicable

EXECUTIVE SUMMARY
The City has historically contracted with Orange County Animal Care (OCAC) to provide animal care and control services. In 2016, the City entered into a ten-year service/participation agreement with OCAC, which included the cost of the construction of a new 10-acre site location. The construction costs were divided among the contracted cities. The City agreed to pay its construction cost over a ten-year payment schedule. The final payment for this schedule will be in June 2026. The site was completed in 2018.

Staff recommends approval of a five-year renewal agreement to ensure the continued delivery of comprehensive, reliable, and regionally supported services. Fountain Valley is one of the 14 contracted cities scheduled to renew the OCAC agreement. Renewing this contract supports operational continuity, mitigates the need for significant City investment in staffing and facilities, and ensures the community continues to receive consistent and professional service levels.

DISCUSSION
The City’s partnership with OCAC has allowed the Police Department to focus on public safety priorities while ensuring professional, cost-effective animal services are delivered to the community. These services are divided into seven (7) different categories: Animal Control Services, Animal Care Services, Animal Shelter Services, Barking Dog Complaint Services, Standard Licensing Services, City License Services, and Animal Impound Services. Another essential service OCAC provides is 24/7 field services, which provides significant benefit to both the community and the Police Department. Having around-the-clock coverage allows Officers to remain focused on core law enforcement duties while ensuring the community receives timely, professional animal services at all hours. These services are part of an

Page 710 ends

OC Animal Care Contract Renewal
April 7, 2026

Page 2 ends

integrated model within an established system that helps reduce administrative burdens and limit liability exposure.

Staff have surveyed neighboring agencies to consider other animal care service options. The survey consisted of a cost analysis and levels/types of service that could be provided to the city. Key distinctions involved the lack of comprehensive, full-service type coverage, the need for the City to staff and manage dedicated animal control personnel, and the potential for increased overall expenses. For these reasons, Staff believes that OCAC is the most costeffective and best option for providing animal care services to the community.

FISCAL REVIEW
The City’s animal service fees are set based on the net cost of services, which is calculated by subtracting the revenue OCAC collects from the total cost of providing services to the City.

This ensures the City pays only for the actual services delivered, maintaining transparency and cost effectiveness.

Each year, OCAC provides the City with a preliminary net cost estimate to provide animal care services for the upcoming year. This is referred to as the Notice of Intent (NOI). This estimate is calculated based on an average level of service use, along with fee revenue collected for the City for the previous two fiscal years of actual utilization of services.

Below is a table for the last three fiscal years, which shows the preliminary cost estimate (NOI) compared to the actual costs the City paid.

The net cost for providing Animal Care services to the City during FY 24/25 was $707,426, which was 17.7% increase from the $601,134 charged for FY 23/24. This was due to an increase in Animal Control field services, which increased by 64 activities compared to FY 24/25 with FY 23/24, and an increase in animal charge days, which increased by 298 days compared from FY 24/25 with FY 23/24.

The NOI for the current fiscal year (25/26) is $753,039. The actual net costs for the full fiscal year will not be available until after 6/30/26; however, the amount paid for the first two quarters (7/01/25-12/31/25) is $300,522.

The NOI for Fiscal Year 2026-2027 is $817,171. This estimate may increase or decrease based on the actual services provided, expenses paid, and user fees received throughout the course of the current year. The adopted 2026-2027 budget allocates $828,040 in Service Contracts line item (100.70800.53010) under PD-Animal Care Services within the General Fund. Therefore, there are sufficient funds for this contract renewal. 22/23 23/24 24/25
Preliminary Estimate $532,360 $617,828 $679,263
Actual Cost $524,881 $601,134 $707,426

Page 711 ends

OC Animal Care Contract Renewal
April 7, 2026

Page 3 ends

PUBLIC NOTIFICATION
This item was noticed publicly as an agenda item for action in accordance with the rules and regulations regarding noticing of public meetings and agendized items and topics for discussion and/or action by the City Council.

ENVIRONMENTAL IMPACT REVIEW
Not applicable.

ATTORNEY REVIEW
The Attorney(s) for the City have reviewed this report and concur.

ALTERNATIVES
Alternative No. 1:

Alternative No. 2:

RECOMMENDATION
Approve the renewal of a Five-Year Agreement with Orange County Animal Care for the continued Provision of Animal Care and Control Services.

Do not approve the renewal of a Five-Year Agreement with Orange County Animal Care for the continued Provision of Animal Care and Control Services.

Staff is requesting City Council approval of Alternative No. 1: Approve the renewal of a FiveYear Agreement with Orange County Animal Care for the continued Provision of Animal Care and Control Services.

Prepared by: Robert Cortes, Lieutenant
Reviewed by: Craig Heredia, Chief of Police
Fiscal review by: Ryan Smith, Finance Director
Attorney review by: Colin Burns, Attorney for the City
Approved by: Maggie Le, City Manager
Attachments:

1. -OC Animal Care Master Service Agreement

Page 712 ends

AGREEMENT FOR PROVISION OF

OC ANIMAL CARE SERVICES

BETWEEN

COUNTY OF ORANGE
AND

CITY OF FOUNTAIN VALLEY
MAY 31, 2026 THROUGH MAY 30, 2031
THIS AGREEMENT entered into this 31st day of May, 2026, which date is enumerated for purposes of reference only, is by and between the COUNTY OF ORANGE, a political subdivision of the State of California (“COUNTY”) and the CITY OF FOUNTAIN VALLEY (“CITY”). This AGREEMENT shall be administered by County of Orange OC Community Resources (“ADMINISTRATOR”). COUNTY and CITY may be referred to individually as a “PARTY” and collectively as the “PARTIES.” W I T N E S S E T H:

WHEREAS, COUNTY owns, and through OC Animal Care operates, an animal care shelter facility at 1630 Victory Road, Tustin, California (“SHELTER"); and WHEREAS, CITY wishes to contract with COUNTY for the provision of the Animal Care Services described herein; and
WHEREAS, COUNTY is willing and able to provide such services on the terms and conditions hereinafter set forth:

NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS:
//
//
//
//
//
//
//
//
//
//
//
//
//

Page 713 ends

CITY OF FOUNTAIN VALLEY 2 of 10

CONTENTS

PARAGRAPH PAGE
Title Page.................................................................................................................................. 1 Contents.................................................................................................................................... 2 Referenced Contract Provisions.............................................................................................. 3 I. Alteration of Terms.................................................................................................................. 4 II. Indemnification and Insurance ................................................................................................ 4 III. Notices...................................................................................................................................... 5 IV. Severability............................................................................................................................... 5 V. Status of the Parties.................................................................................................................. 5 VI. Term ......................................................................................................................................... 6 VII. Termination .............................................................................................................................. 6 VIII. Third Party Beneficiary ........................................................................................................... 7 IX. Waiver of Default or Breach.................................................................................................... 7 X.Use of Shelter Upon Discontinuance of Use by County……………………………………. 7 XI.Participation of New Cities…………………………………………………………………. 8 XII.Governing Law and Venue………………………………………………………………….. 8 XIII.Attorney Fees.............................................................................................................................. 8 XIV.Appropriations………………………………………………………………………………… 8
Signature Page.......................................................................................................................... 10

EXHIBIT A
I. Definitions................................................................................................................................ 1 II. Services to be Provided by County ......................................................................................... 1 III. Payments .................................................................................................................................. 4 IV. City Manager’s Association Animal Care Committee ........................................................... 5 V. Laws and Regulations.............................................................................................................. 5 VI. Reports...................................................................................................................................... 6 VII. Records..................................................................................................................................... 6

EXHIBIT B
Animal Care Notice of Intent................................................................................................1 Page //
//
//

Page 714 ends
← All documents from this meeting