Project: Schedule.mpp
Date: Thu 9/16/21
ID Task
Mode
Task Name Duration Start Finish
1 Task 1 - Data Collection and Meetings 9 mons Fri 10/1/21 Thu 6/9/22 2 Kickoff Meeting 0 days Fri 10/1/21 Fri 10/1/21
3 Task 2 - Sewer CCTV Survey 4 wks Sun 1/16/22 Thu 2/10/22 4 Task 3 - Manhole Inspection 4 wks Sun 1/16/22 Thu 2/10/22 5 Task 4 - Flow Monitoring 3 mons Mon 11/1/21Fri 1/21/22 6 Task 5 - Sewer Flow Projections 2.5 mons Mon 12/20/21Fri 2/25/22 7 Task 6 - Lift Station Assessment 4 wks Sun 1/16/22 Thu 2/10/22 8 Task 7 - GIS and Hydraulic Model Development 5 mons Mon 10/18/21Fri 3/4/22 9 Task 7.1 - GIS Development 3 mons Mon 10/18/21Fri 1/7/22 10 Task 7.2 - Hydraulic Model Development and Calibration 3 mons Mon 12/13/21Fri 3/4/22 11 Task 8 - Technical Memorandum on Existing and
Future Wastewater Collection System
5 wks Mon 3/7/22 Fri 4/8/22
12 Task 9 - Capital Improvement Program 1.5 mons Wed 3/30/22Tue 5/10/22 13 Task 10 - Master Plan Report 2 mons Fri 4/15/22 Thu 6/9/22 14 Draft Master Plan 0 days Thu 5/19/22 Thu 5/19/22
15 Final Master Plan 0 days Thu 6/9/22 Thu 6/9/22
16 Task 11 - Sewer System Management Plan Update 3 mons Fri 3/18/22 Thu 6/9/22 17 Draft SSMP Report 0 days Thu 5/12/22 Thu 5/12/22
18 Final SSMP Report 0 days Thu 6/9/22 Thu 6/9/22
19 Task 12 - Sewer Design Manual 1.5 mons Mon 4/4/22 Fri 5/13/22 20 Draft Sewer Design Manual 0 days Mon 4/25/22Mon 4/25/22 21 Final Sewer Design Manual 0 days Fri 5/13/22 Fri 5/13/22 22 Task 13 - On-Call Hydraulic Analysis (Optional Task) 123 days Mon 3/14/22Wed 8/31/22 23 Task 14 - Additional Manhole Inspection (Optional Task)16 wks Sun 1/16/22 Thu 5/5/22 10/1
5/19
6/9
5/12
6/9
4/25
5/13
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress

Page 1 ends

Project: Schedule.mpp
Date: Thu 9/16/21

REFERENCES
CAROLLO // PROPOSAL // SEPTEMBER 2021
\\io-bd-1\BD-DATA\Marketing\Pursuits\Client24(LAO)\Gardena\SewerMP\Prop0921\Indd\Gardena-SewerMP-Prop0921 CITY OF GARDENA PUBLIC WORKS DEPARTMENT // SEWER MASTER PLAN 2021 14 Just Ask Our Clients. Below we have included a selection of relevant projects with references, as requested in the RFP . We encourage you to contact these references to verify the quality of our services on similar projects. They can attest to the technical capabilities, management skills, work quality, and commitment to client service of our team members.

EXPERIENCE THAT COUNTS
Carollo is known for the large number of clients with whom we have maintained long-term relationships. In the last 10 years alone, Carollo has completed master plans for $7.5 billion in wastewater facilities. Our experience shows that open communication, collaboration, and coordination build trust, minimize conflict, and eliminates surprises.

If we look at California, there aren’t many areas where Carollo hasn’t completed a planning study. While not all the projects listed on the adjacent map were completed by our proposed team, a significant number of them were. Carollo’s planning team has experience in wastewater planning projects
that span a vast spectrum of services, from small specific planning studies to large regional programmatic planning efforts. In the long run, it’s that experience that provides you with the knowledge that by selecting Carollo, you have a trusted advisor who can tap into a wealth of experience tackling similar challenges to yours. We look forward to adding the City to our list of happy master plan clients.

The table below presents a sample of some of our relevant experience within the last 5 years, along with references who can attest to our level of service and responsiveness on similar projects.

PROJECT/CLIENT CLIENT CONTACT TEAM INVOLVEMENT
Citywide Wastewater Master Plan Update |
City of Chino Hills, CA
Fe M. Rama, Senior Engineer
P: 909-364-2776
E: [email protected]
Ryan Orgill, Danielle Orgill, Tim Loper, Greg
Gould, Mike Wetterau, Kevin Christensen,
V&A
Sewer Master Plan | City of Torrance, CA John Dettle, Engineering Manager P: 310-618-3059
E: [email protected]
Inge Wiersema, Tim Loper, Ryan Orgill,
Danielle Orgill, Mike Wetterau, Kevin
Christensen, V&A
Integrated Water and Wastewater
Resources Management Plan | City of South
Pasadena, CA
H. Ted Gerber, Deputy Public Works Director
P: 626-460-6392
E: [email protected]
Inge Wiersema, Ryan Orgill, Tim Loper, Kevin
Christensen, V&A
Comprehensive Wastewater Master Plan
and Update | City of Riverside, CA
Ernest Marquez, Principal Engineer
P: 951-826-5409
E: [email protected]
Ryan Orgill, Tim Loper, Danielle Orgill, Inge
Wiersema, James Doering, Khalil Kairouz,
Mike Wetterau, V&A
Comprehensive Facilities Master Plan
and Update | Padre Dam Municipal Water
District, CA
Mark Niemiec, Manager of District Projects
P: 619-258-4766
E: [email protected]
Inge Wiersema, Ryan Orgill, Tim Loper,
Joaquin Ramirez, Kevin Christensen, Mike
Wetterau, V&A
Shasta Lake
Redding
Chico
Oroville
Yuba City
Elk Grove
Truckee Sanitary District
South Tahoe Public Utility District
Madera CountyLos
Banos Fresno
Selma-Kingsburg-Fowler County Sanitation District
Visalia
Tulare Porterville
Lost Hills Utility District
Bakers/f_ieldTaft
Moorpark
Santa Barbara
Camrosa Water District
Oxnard
Simi
Valley
Los Angeles World Airport
VictorvilleHesperia
Cucamonga Valley Water District
Upland
Indio
El Centro
Torrance
Santa Maria
California Department of Corrections
Morro Bay
Modesto
Turlock
Livingston
Atwater
Galt
Napa
Sanitation
DistrictCotati
Sacramento Regional County Sanitation District
Riverside
Eastern Municipal Water District
Elsinore Valley Municipal Water District
Hanford
Lemoore
King City
West County Wastewater District
Oakland
San Francisco
East Bay Dischargers Authority
Paci/f_ica
San Bruno
Millbrae
Hayward
Foster City
Mid-Peninsula Water District
Sewer Authirity Mid-Coastside
Union Sanitary District
San Jose
Mountain View
West Valley Sanitation District
Santa Cruz
Morgan Hill
Watsonville
Gilroy
Orange County Sanitation District
Inland Empire Utilities Agency
Anaheim
Garden Grove
Yorba Linda Water District
UC Irvine
Mesa Water
El Toro Water District
Moulton Niquel Water District
San Clements
Oceanside
Carlsbad
Encina Wastewater Authority
San Diego
Padre Dam Municipal Water District
Los Angeles
Glendale
Pasadena
San Bernardino
Colton
Redlands
Yucaipa
Banning
References

APPENDIX
CAROLLO // PROPOSAL // SEPTEMBER 2021
\\io-bd-1\BD-DATA\Marketing\Pursuits\Client24(LAO)\Gardena\SewerMP\Prop0921\Indd\Gardena-SewerMP-Prop0921 CITY OF GARDENA PUBLIC WORKS DEPARTMENT // SEWER MASTER PLAN 2021 15 Appendix

RESUMES
ƒ Inge Wiersema
ƒ Ryan Orgill
ƒ Tim Loper
ƒ Danielle Orgill
ƒ Joaquin Ramirez
ƒ Mike Wetterau
ƒ Kevin Christensen
ƒ Greg Gould
ƒ Khalil Kairouz
ƒ James Doering
ƒ Miko Aivazian
ƒ Kevin Krajewski (V&A)
ƒ Jeff Garcia (NPS)

Education
MSc Environmental
Engineering, Agricultural
University, Wageningen,
Dutch (Netherlands),
1997
MSc Water Management
Coursework of Civil
Engineering, Technical
University Delft, Dutch
(Netherlands), 1996
BS Environmental
Engineering, Hogeschool
Van Utrecht, Dutch
(Netherlands), 1995
Licenses
Civil Engineer, California,
Hawaii
Environmental
Sustainability Professional
(ENV SP)
Professional
Affiliations
American Academy of
Water Resources
Engineers
American Society of Civil
Engineers
American Water Works
Association
Association of Women in
Water, Energy, and
Environment
Institute for Sustainable
Infrastructure
Water Environment
Federation
WateReuse Association

Inge Wiersema, P. E ., ENV SP
Inge Wiersema is an environmental engineer with 26 years of experience and is spe- cialized in strategic, integrated, and utility master planning. She is a Vice President with Carollo and serves as the company’s Water Resources Practice lead and National One Water Leader. Inge has been involved in more than 150 master planning and hy- draulic modeling projects for water, recycled water, wastewater, and stormwater sys- tems. She has also worked on various groundwater management plans, watershed management plans, urban water management plans, and water supply studies. Her technical experience also includes conceptual and preliminary design of pipelines, pump stations, and water treatment plants.

Recently, Inge’s has been focused on large strategic integrated planning effort, in- cluding extensive stakeholder engagement with facilitation of diverse groups, climate change and resilience planning, and she led several One Water Plans.

Relevant Experience
 Project manager for the Integrated Wa-
ter Wastewater Resources Management
Plan for the City of South Pasadena. This
first-ever master plan for the City encom-
passes its water, wastewater, and storm-
water systems, and explores the feasibility of
a recycled water system. Hydraulic models
and system GIS updates were prepared for
the water, sewer, and recycled water system,
while stormwater management opportuni-
ties were explored. The findings were com-
bined in a comprehensive master plan re-
port and integrated CIP that will guide the
City with major infrastructure investments
through year 2050.
 Principal-in-charge for the City of Tor-
rance, California, 2020 Sewer Master Plan.

This project involved sewer system model
development, calibration, analysis, and
preparation of a phased capital improve-
ment plan. Flow monitoring data was used
to calibrate the model for both dry and wet
weather conditions.
 Project manager for the 2015 Compre-
hensive Master Plan for Padre Dam Munici-
pal Water, California. This integrated master
plan involved the District’s water,
wastewater, and recycled water infrastruc-
ture. This project included potable and recy-
cled water demand/sewer flows forecasting,
water supply analysis, hydraulic model up-
dates for the water and recycled water sys-
tems, development and calibration of a new
sewer system model, and field condition as-
sessment of key facilities. In addition, the
feasibility of the wastewater plant expansion
for an indirect potable reuse (IPR) project
was evaluated. The findings were combined
in a comprehensive CIP and water master
plan report.
 Project manager for the Wastewater
Master Plan and Sewer System Manage-
ment Plan (SSMP) for the Elsinore Valley
Municipal Water District, California. The pro-
ject included the creation and calibration of
a hydraulic model in H2OMAP SWMM®,
system analysis, the preparation of a capital
improvement program (CIP), a master plan
report, and a SSMP report. The sewer sys-
tem serves 92 square miles and includes
360 miles of pipeline and 32 lift stations.
 Project manager for a Sewer Master Plan
for the City of Banning, California. The pro-
ject included development of a sewer
model from a geographic information sys-
tem (GIS), wastewater flow projections,
model calibration with field data, supply
analysis, hydraulic analysis, and preparation
of a capital improvement plan. The findings
of the project were documented in a com-
prehensive sewer master plan.
 Project manager for the 2016 Sewer
Master Plan for the City of Colton, California.

This project included wastewater flow fore-
casting, hydraulic model development and
calibration using field flow monitoring data.

Existing and future system analysis was con-
ducted to develop a capital improvement
program (CIP) including a rehabilitation and
replacement program. The findings were
presented in a comprehensive sewer master
plan report that was developed in conjunc-
tion with the 2016 Water Master Plan.

Inge Wiersema, P. E ., ENV SP

 Project manager for the 2015
Wastewater Flow Monitoring Study for the
Padre Dam Municipal Water District
(PDMWD), California. This project included
the installation and data analysis of a large
number of flow monitoring meters in
PDMWD’s sewer conveyance system. Find-
ings were documented in an engineering
report.
 Project engineer for the Wastewater
Master Plan for the City of Hesperia, Califor-
nia. The project included projection of
wastewater flows, siting of three new
wastewater treatment plants, development
and calibration of a hydraulic model in
H2OMAP Sewer®, and hydraulic analysis to
size gravity pipelines, force mains, lift sta-
tions, and treatment plants. Solids handling
facilities were also sized. The findings of the
project were documented in a comprehen-
sive wastewater master plan and a $420
million capital improvement program.
 Project manager for the Sewer Master
Plan for the City of Hughson, California. The
project included development of a sewer
model in H2OMAP Sewer®, wastewater
flow projections, model calibration with field
data, hydraulic analysis, and preparation of
a capital improvement plan. The findings of
the project were documented in a compre-
hensive report.
 Project manager for the 2015 integrated
water, recycled water, and sewer master
plan for the City of Oceanside, California.

This project includes (recycled) water de-
mand/sewer flows forecasting, water supply
analysis, hydraulic model updates and cali-
bration of the water and wastewater system
models, and development of a new recycled
water system model. In addition, the infra-
structure needs of the development of the
agricultural Morro Hills area, including soil
percolation testing for feasibility analysis of
septic tanks, were evaluated. Closed-circuit
television (CCTV) of 60 sewer and 30 water
pipeline segments were conducted. The
findings were combined in a CIP and water
master plan report.
 Technical advisor for the 2015 compre-
hensive integrated master plan for the City
of Oxnard, California. This project resulted in
a long-term strategy and capital improve-
ment program (CIP) for the City's water,
wastewater, recycled water, and stormwater
facilities, including a proposed aquifer stor-
age and recovery (ASR) program. Inge was
the technical lead on the water master plan
portion of this project, which included water
demand forecasting, hydraulic modeling
analysis using WaterGEMS, existing and fu-
ture system analysis, development of a the
water system CIP, including a rehabilitation
and replacement program.
 Technical advisor for the One Water
Morro Bay for the City of Morro Bay, Cali-
fornia. This project involved the develop-
ment of a strategic plan that considered the
challenges and solutions of the City’s
wastewater treatment plant upgrade, devel-
opment of local water supplies (incl.
groundwater, indirect potable reuse and
ocean desalination), water conservation
strategies, and stormwater in a comprehen-
sive manner. In addition, traditional wa-
ter/wastewater/recycled water utility master
planning with hydraulic modeling and CIP
development was part of the project.
 Project manager for the One Water LA
2040 Plan for the City of Los Angeles, Cali-
fornia. The Plan is a collaborative effort of
the LA Sanitation (LASAN) and LA Depart-
ment of Water and Power (LADWP) that
takes a holistic approach to consider all
types of water as "One Water." The Plan was
developed through a stakeholder driven
process. Inge was intimately involved in the
stakeholder engagement process, preparing
and participating in dozens of workshops
with various City departments, regional
agencies, NGOs, the community, academia,
executive management, mayor’s office. As
Project Manager, Inge was responsible for
the coordination of the work effort with City
staff from multiple departments and more
than 20 subconsultants. The final plan con-
sists of 9 volumes, which will guide the City
with strategic and multi-billion dollar deci-
sions for water infrastructure projects to
make LA a more water resilient and sustain-
able City.

Education
BS Civil Engineering,
California State
University, Fresno, 2006
Licenses
Civil Engineer, Nevada,
California
Professional
Affiliations
American Water Works
Association
California Water
Environment Association
– Central San Joaquin
Section

Ryan F. Orgill, P. E .

Ryan Orgill has 17 years of experience in master planning, hydraulic modeling, sewer system management planning, urban water management planning, and geographic information systems (GIS). He serves as Carollo’s companywide lead for sewer system modeling, calibration, and system analysis. In addition, Ryan developed Carollo’s means and methods for sewer system planning that have been adopted company- wide and is an expert in delivering projects that incorporate all critical elements of collection system capital program needs.

Relevant Experience
 Project manager for the City of Scotts
Valley, California, Sewer Master Plan. As part
of the project, Carollo developed a collec-
tion system hydraulic model of the City’s
sewer system and conducted a capacity
analysis of the system under existing and fu-
ture flow conditions.
 Project manager for City of Chino Hills,
California, Citywide Wastewater Master Plan
Update. This ongoing project will update
and evaluate the City’s wastewater collec-
tion system hydraulic model. The project
scope also included coordinating with a
pipe inspection contractor to inspect up to
20 miles of pipeline.
 Project engineer for the City of Torrance,
California, 2020 Sewer Master Plan. This
project involved sewer system model devel-
opment, calibration, analysis, and prepara-
tion of a phased capital improvement plan.

Flow monitoring data was used to calibrate
the model for both dry and wet weather
conditions.
 Project manager for the Padre Dam Mu-
nicipal Water District, California, 2020 Com-
prehensive Facilities Master Plan Update.

This integrated master plan involves updat-
ing the District’s water, wastewater, and re-
cycled water infrastructure. This project in-
cludes (recycled) water demand/sewer flows
forecasting, water supply analysis, hydraulic
modeling updates for the water and recy-
cled water systems, development and cali-
bration of a new sewer model, and field con-
dition assessment of key facilities with opera-
tions staff.
 Project manager for the South Tahoe
Public Utility District, California, Sewer Sys-
tem Hydraulic Model. No changes or up-
dates had been made to the District’s
wastewater collection system model that
was created 10 years ago using the Innovyze
InfoSewer hydraulic modeling software. In
the last decade, additional infrastructure
construction and collection system changes
have been made. This contract allowed for
on-call hydraulic modeling support to eval-
uate the existing model, identify potential
improvements, and convert the model to
InfoSWMM.
 Engineer for the City of Oceanside, Cali-
fornia, Sewer System Master Plan. Responsi-
ble for system evaluation, hydraulic model-
ing, development of the Sewer Master Plan
report, and custom model training for City
staff.
 Project engineer for the Elsinore Valley
Municipal Water District, California, Sewer
System Management Plan, which involved
development and review of all applicable
SSMP requirements, including a system
evaluation and capacity assurance plan.
 Staff engineer for the Port of Oakland,
California, Phase I Sewer System Manage-
ment Plan, which included development of
a Port-specific overflow emergency re-
sponse plan; fats, oils, and grease control
plan; sanitary sewer use ordinances; opera-
tions and maintenance recommendations;
and sanitary sewer design standards.
 Project engineer for the City of Hanford,
California, Sewer System Management Plan,
which involved development or review of all
applicable SSMP requirements, including an
overflow emergency response plan and a
review of the City’s most recent sewer sys-
tem master plan, design standards, and
sewer ordinances.
 Project engineer for the City of Pismo
Beach, California, Sewer System Manage-
ment Plan, which included development of
a fats, oils, and grease control plan.

Ryan F. Orgill, P. E .

 Project engineer for the City of Hugh-
son, California, Sewer System Management
Plan, which was developed as part of the
City’s Water, Sewer, and Storm Drainage
Master Plan project. The project involved
development of many of the SSMP ele-
ments, including a system evaluation and
capacity assurance plan, overflow emer-
gency response plan, and a fats, oils, and
grease control plan.
 Project engineer for the City of Tulare,
California, Sewer, Water, and Storm Drain-
age Master Plans and Sewer System Man-
agement Plan. Tasks included creation and
calibration of a dynamic hydraulic sewer
system model to evaluate flow monitoring
data, development of flow routing criteria,
and evaluation of the existing sanitary sewer
system to mitigate deficiencies and serve fu-
ture growth.
 Staff engineer for the City of Galt, Cali-
fornia, Wastewater Collection, Water Distri-
bution, and Storm Drainage Master Plans.

Responsible for calibration of the hydraulic
computer model to both dry weather and
wet weather conditions, assistance with
preparation of the Master Plan report, and
development of a staged capital improve-
ment plan for the City.
 Project manager for the Truckee Sanitary
District, California, 2017 Hydraulic Modeling
Assistance. Carollo assisted the District with
development and calibration of three of the
four existing wastewater collection system
models. The models were calibrated to peak
dry and peak wet weather flow conditions
using flow monitoring data from the 2016
and 2017 storm season.
 Hydraulic modeling lead for the City of
Modesto, California, Wastewater Collection
System Master Plan. The hydraulic model
was originally constructed in H2OMap
Sewer as part of the previous master plan. In
advance of the wastewater collection sys-
tem master plan update, the City contracted
with Carollo to convert the hydraulic model
from H2OMap Sewer to the more advanced
InfoSWMM platform. Responsible for up-
dating and recalibrating the InfoSWWM hy-
draulic model, which involved more sophis-
ticated simulation of storm drainage system
cross connections within the InfoSWMM
model. Also responsible developing existing
and future wastewater flow projections, im-
provement alternatives to mitigate existing
capacity deficiencies and serve future
growth, and a capital improvement plan.
 Project engineer for the City of Fresno,
California, Collection System Master Plan.

Responsible for hydraulic model update and
calibration of the City’s all-pipe sewer sys-
tem hydraulic model under dry and wet
weather conditions, development of im-
provement projects to mitigate capacity de-
ficiencies, and development of a capital im-
provement plan for the City.
 Collection system engineer for the West
County Wastewater District, California, Dis-
trict-Wide Master Plan. Responsible for
preparation and calibration of a dynamic
collection system model to evaluate wet
weather storm events to simulate existing
flow conditions.
 Project engineer for the City of Turlock,
California, Sanitary Sewer and Storm Water
Master Plans. Responsible for overseeing
the construction of the City’s sewer and
storm drainage system hydraulic models.

The City’s sewer collection system includes
numerous direct storm drainage connec-
tions to the sewer system in the City’s
downtown area. As part of the analysis, sev-
eral improvement alternatives were consid-
ered to alleviate capacity deficiencies in the
sewer collection system. Preferred improve-
ments to the sewer and storm drainage sys-
tems were incorporated into the Sanitary
Sewer and Storm Water Master Plan re-
ports.
 Project engineer for the City of Chico,
California, Sanitary Sewer Master Plan Up-
date. Responsible for conversion and up-
date of the City’s previous HYDRA collection
system model to the InfoSWMM hydraulic
modeling software application. Buildout av-
erage and peak flows were projected for fu-
ture land use areas, as identified in the City’s
General Plan Update. The project was cali-
brated to dry and wet weather flow condi-
tions, and the collection system was ana-
lyzed under current and buildout peak flow
conditions

Education
MS Environmental
Engineering, University of
California, Berkeley, 2005
BS Civil Engineering,
California State
University, Fresno, 2003
Licenses
Civil Engineer, California,
Nevada
Professional
Affiliations
Nevada Water
Environment Association
American Water Works
Association

Timothy J. Loper, P. E .

Timothy Loper has 20 years of experience in wastewater collection system modeling, water distribution system modeling, water system feasibility studies, wastewater treatment facilities planning, and infrastructure master planning. He is Carollo’s Infra- structure Master Planning Services Lead and has served as project manager and/or project engineer for more than 90 water, wastewater, stormwater and/ or recycled water master plans and modeling projects, with a focus on helping agencies develop capital improvement programs that help prioritize rehabilitation and replacement projects, as well as integrate capital with inspection and funding prioritization.

Relevant Experience
 Technical advisor and collection system
lead for the City of Riverside, California,
Comprehensive Wastewater Master Plan,
which included both treatment and
wastewater collection systems. Carollo built
the City’s collection system model using the
Innovyze InfoSWMM modeling software.
 Project manager for the City of Torrance,
California, 2020 Sewer Master Plan. This
project involved sewer system model devel-
opment, calibration, analysis, and prepara-
tion of a phased capital improvement plan.

Flow monitoring data was used to calibrate
the model for both dry and wet weather
conditions.
 Quality control engineer for the City of
Banning, California, Water and Wastewater
Master Plan. The project involved updating
the City’s water, sewer, and recycled water
master plans into an integrated master plan
to guide the City with budgeting and imple-
mentation of capital improvement projects.

Responsible for quality review and project
oversite and technical direction.
 Quality control engineer for the 2015
Comprehensive Master Plan for Padre Dam
Municipal Water, California. This integrated
master plan involved the District’s water,
wastewater, and recycled water infrastruc-
ture. This project included potable and recy-
cled water demand/sewer flows forecasting,
water supply analysis, hydraulic model up-
dates for the water and recycled water sys-
tems, development and calibration of a new
sewer system model, and field condition as-
sessment of key facilities. In addition, the
feasibility of the wastewater plant expansion
for an indirect potable reuse (IPR) project
was evaluated. The findings were combined
in a comprehensive CIP and water master
plan report.
 Project engineer for the City of
Oceanside, California, Integrated Master
Plan, which included a new collection sys-
tem hydraulic model prepared from GIS
data using InfoSWMM. The existing system
was evaluated with respect to existing and
future capacity needs. The master plan also
considered a phased plan for replacement
of the City’s water and wastewater pipelines
as part of the rehabilitation and replace-
ment program.
 Collection system lead for the West
County Wastewater District, California, Dis-
trict-Wide Master Plan. The project included
the sanitary sewer collection system, Water
Pollution Control Plant, and non-process fa-
cilities. Work efforts included condition and
capacity assessments, alternatives evalua-
tion, and 20-year capital improvement pro-
gram development. All the District’s facilities
were combined in one master plan, allowing
the needs of each to be prioritized in an
overall program. Other work efforts in-
cluded a risk-based analysis of all 12,000 as-
sets to identify failure likelihood, BioWin
modeling to assess capacity, 3-D computa-
tional fluid dynamics modeling of secondary
basins to optimize performance, and a wet
weather capacity improvements assessment
of the 249-mile collection system.

 Project manager for Vallejo Flood and
Wastewater District, California, Collection
System Master Plan. Responsible for day-to-
day management and technical direction,
including District and subconsultant coordi-
nation, progress meetings, and communica-
tion. Provided technical direction for devel-
opment of the flow monitoring program,
hydraulic model construction and calibra-
tion, and development of the inspection
and rehabilitation program.

Timothy J. Loper, P. E .

 Project manager for the City of Fresno,
California, Wastewater Collection System
Master Plan. The project identified capacity
constraints within the existing collection sys-
tem and provided recommendations for in-
frastructure improvements necessary to ac-
commodate densification and future
growth, including future industrial growth.

The master plan included an update of the
City’s sewer rehabilitation project capital im-
provement plan.
 Collection system project manager for
the Central Contra Costa Sanitary District,
California, Comprehensive Wastewater Mas-
ter Plan. The project involved conducting a
pump station condition assessment and de-
veloping a force main inspection program
and a large-diameter condition and rehabil-
itation plan. The project also included crea-
tion of a collection system asset manage-
ment plan. The master plan focused on
pump stations, force mains, and collection
system assets and summarized the District’s
assets in detail.
 Project manager for the City of Turlock,
California, Sanitary Sewer, and Storm Water
Master Plans. Responsible for overseeing
construction of the City’s sewer and storm
drainage system hydraulic models. The
sewer collection system includes numerous
direct storm drainage connections to the
sewer system in the City’s downtown area.

Several improvement alternatives were con-
sidered to alleviate capacity deficiencies in
most of the downtown sewer collection sys-
tem, including replacing existing sewer
pipelines with larger diameter sewers or re-
moving the direct storm drainage connec-
tions to the sewer. Preferred improvements
to the sewer and storm drainage systems
were incorporated into the Sanitary Sewer
and Storm Water Master Plan reports.
 Project manager for the City of Chico,
California, Sanitary Sewer Master Plan Up-
date. Responsible for conversion and up-
date of the City’s previous HYDRA collection
system model to the InfoSWMM hydraulic
modeling software application. The project
was calibrated to dry and wet weather flow
conditions, and the collection system was
analyzed under current and buildout peak
flow conditions.
 Project manager for the City of Cotati,
California, Wastewater Collection and Water
Distribution System Master Plans and GIS
Implementation. The City contracted with
Carollo to develop water distribution system
and sewer collection system master plans
and the 2010 Urban Water Management
Plan, as well as plan and implement the
City’s first GIS. Responsible for day-to-day
project management and client contacts.

Also served as project engineer for the
Sewer System Master Plan. Carollo con-
structed hydraulic models of the water and
sewer systems, developed a flow monitoring
report from data collected from another
consultant, developed evaluation criteria,
assessed existing system deficiencies, and
developed plans for future projects.
 Project engineer for the Elsinore Valley
Municipal Water District, California,
Wastewater Master Plan. Responsible for
coordination of GIS integration into the hy-
draulic model environment and construc-
tion of a SWMM model incorporating four
separate collection system stations with
three wastewater treatment facilities. Capital
project recommendations were made to
serve future growth and system modifica-
tions were analyzed to eliminate lift stations
and force mains with gravity sewers. The
project also involved preparation of a mas-
ter plan report, including a capital improve-
ment program. The project also developed
a Sewer System Management Plan for all
four of the District’s separate collection sys-
tems.
 Project engineer for the City of Modesto,
California, Wastewater Collection System
and Treatment Master Plan Update. Re-
sponsible for construction of the wastewater
collection system hydraulic computer model
using the City’s existing plat maps and GIS
database. Also responsible for collection
system analysis to determine appropriate
flow monitoring locations and sewer basin
determination and assistance with the col-
lection system condition assessment. Per-
formed GIS data verification and updated
existing databases to reflect current condi-
tions. These responsibilities required the ap-
plication of GIS and hydraulic modeling
software.

Education
BS Civil & Environmental
Engineering, University of
South Florida, 2012
BS Microbiology,
University of South
Florida, 2006
Licenses
Civil Engineer, California
Professional
Affiliations
American Society of Civil
Engineers
- Truckee Meadows
Branch YMF Director
at Large 2016-2017
Florida Water
Environment Association
- Manasota Chapter YP
Coordinator 2013-
2014
- Students and Young
Professionals
Committee Chair
2014-2016
ACE Mentors of Sarasota,
Treasurer 2014-2015
Danielle M. Orgill, P. E .

Danielle Orgill has eight years of experience in infrastructure design, modeling, and planning, and has assisted with master planning and evaluation studies for sewer systems. She also has experience in data management, analysis, hydraulic modeling, asset management, and GIS.

Relevant Experience
 Project engineer for City of Chino Hills,
California, Citywide Wastewater Master Plan
Update. This ongoing project will update
and evaluate the City’s wastewater collec-
tion system hydraulic model. The project
scope also included coordinating with a
pipe inspection contractor to inspect up to
20 miles of pipeline. Responsible for evalu-
ating the City’s existing collections system
and providing a recommended list of priori-
tized pipelines for inspection.
 Project engineer for City of Pinole, Cali-
fornia, Sanitary Sewer Master Plan Update.

The City is required to inspect and record
the condition of every pipeline by March
2023. Carollo is developing an inspection
program to assist the City in meeting this
requirement. The program will involve coor-
dinating with a contractor to inspect a large
portion of the City’s pipelines (approxi-
mately 50 miles in total length).
 Project engineer for Vallejo Flood and
Wastewater District, California, Wastewater
Collection System Master Plan Update. This
project is ongoing and involves a condition
assessment of more than 375 miles of col-
lection system pipeline. Pipelines were
grouped into inspection and replacement
years based on condition scores and/or age
and estimated remaining useful life for a
comprehensive long-term rehabilitation and
replacement program. The project also in-
cludes a hydraulic analysis of pipes 10 inches
and larger to identify capacity deficiencies
and develop recommended improvements.
 Modeler for the City of Riverside, Califor-
nia, Comprehensive Wastewater Master
Plan, which included both treatment and
wastewater collections. Carollo built the
City’s collection system model using the In-
novyze InfoSWMM modeling software.
 Modeler for the City of Torrance, Califor-
nia, 2020 Sewer Master Plan. This project in-
volved sewer system model development,
calibration, analysis, and preparation of a
phased capital improvement plan. Flow
monitoring data was used to calibrate the
model for both dry and wet weather condi-
tions.
 Project engineer for the South Tahoe
Public Utility District, California, Sewer Sys-
tem Hydraulic Model. Work completed to
date on this ongoing project includes devel-
oping a permanent flow monitoring pro-
gram, evaluating flow monitoring data to
determine ADWF and wet weather compo-
nents for each basin, converting the Dis-
trict’s hydraulic model from InfoSewer to In-
foSWMM, updating the hydraulic model
based on recent GIS, calibrating the hydrau-
lic model based on data gathered from the
permanent flow monitoring program, evalu-
ating the existing collection system and
identifying recommended capacity im-
provements, and conducting hydraulic
model training for District staff.
 Project engineer for the City of Cotati,
California, Sewer System Master Plan Ad-
dendum. Responsible for flow monitoring
data review; hydraulic model update and
calibration; evaluation of previously identi-
fied improvements under existing, near-
term, and buildout conditions; update of the
capital improvement plan; and develop-
ment of a technical report.
 Project engineer for the City of King City,
California, Wastewater Collection System
Master Plan. Responsible for hydraulic
model development and calibration under
dry and wet weather conditions, evaluation
of existing infrastructure, development of a
capital improvement plan to mitigate exist-
ing deficiencies and serve future growth,
and development of the master plan report.
 Project engineer for the Washoe County,
Nevada, Collection System Flow Monitoring,
Hydraulic Modeling, and Arsenic Evaluation.

Responsible for coordinating project execu-
tion and subconsultant activities for flow
Danielle M. Orgill, P. E .

and water quality investigation of the South
Truckee Meadows Water Reclamation Facil-
ity and Spanish Springs service areas. A de-
tailed analysis of storm impacts, infiltration,
and inflow in the identified services areas
was necessary to address current flow and
water quality issues and to confirm ade-
quate conveyance capacity would be availa-
ble as new growth occurs in Washoe
County.
 Project engineer for the ongoing
Truckee Sanitary District, California, 2017 Hy-
draulic Modeling Assistance. The District
hired Carollo to assist with development
and calibration of three of the four existing
wastewater collection system models. The
models are being calibrated to peak dry and
peak wet weather flow conditions using flow
monitoring data from the 2016 and 2017
storm season.
 Project engineer for the City of Reno,
Nevada, Northwest Reno Sewer Capacity
Analysis and Master Plan. Carollo was re-
tained to conduct a sanitary sewer capacity
analysis and develop a master plan for the
City’s Northwest area. The team developed
a temporary flow monitoring program; re-
viewed the existing SewerGEMS model to
expand the City’s wastewater collection sys-
tem hydraulic computer model, including
nine major trunk lines; calibrated the model
using flow monitoring data; reviewed plan-
ning documents to determine existing and
buildout wastewater flow projections; mod-
eled existing and future system capacity
evaluations; and developed prioritized, rec-
ommended capacity projects based on defi-
ciencies.
 Project engineer for the Collier County,
Florida, Wastewater Collection System
Model Update. Responsible for converting
the SewerGEMS (Bentley) model to In-
foSWMM (Innovyze), calibrating the model
under dry and wet weather conditions, eval-
uating the existing collection system, and
developing future scenarios (to be evalu-
ated under separate work assignment).
 Project engineer for Fairfield-Suisun
Sewer District, California, Collection System
Asset Management Plan. The project in-
volved evaluating more than 400 miles of
collection system linear assets for expected
replacement (considering age, CCTV data,
and maintenance data) and determining fi-
nancial needs projected over 30 years. Rec-
ommended improvements were prioritized
and incorporated into a 10-year CIP.
 Project engineer for the City of Tulare,
California, Water Treatment Plant Capacity
Evaluation. Responsible for hydraulic model
update and calibration under dry and wet
weather conditions, evaluation of an existing
sewer trunk to serve a development that
would like to tie into the City’s collection
system, and development of recommended
improvements to correct deficiencies and to
serve the known development.
 Project engineer for the City of Reedley,
California, October 27, 2016 Sanitary Sewer
Overflow Event. Responsible for develop-
ment of a hydraulic model scenario that
mimicked a power failure at the influent
pump station and subsequent overflow
events. Wastewater treatment plant influent
flow data and photographs taken during
the spill event were used to estimate the to-
tal overflow volumes.
 Project engineer for the West County
Wastewater District, California, Inflow and
Infiltration Reduction Evaluation. Responsi-
ble for evaluation and classification of Janu-
ary 2017 rainfall events, development of an
estimate of the influent flow hydrograph for
the January 2017 rainfall events using the
District's hydraulic model, review of the cur-
rent status of the ongoing flow monitoring
program, and estimation of the potential re-
duction in peak flow that could be achieved
through the District’s ongoing infiltration/in-
flow reduction program.
 Project engineer for the Manatee
County, Florida, Wastewater Collection Sys-
tem Master Plans. Responsible for coordi-
nating field testing to install temporary flow-
meters and pressure loggers, updating and
calibrating complex collection system mod-
els for three service areas in SewerGEMS
software (each with 150 or more active lift
stations), and determining future infrastruc-
ture requirements for the 2020, 2025, 2035,
and buildout planning periods based on
model results.

Education
MS Civil Engineering,
California State
University, Fresno, 2013
BA Mathematics,
California State
University, Fresno, 2011
Licenses
Civil Engineer, California
Professional
Affiliations
American Society of Civil
Engineers
Joaquin D. Ramirez, P. E .

Joaquin Ramirez has seven years of experience in hydraulic modeling, master planning, and geographic information systems (GIS). His experience includes performing hydraulic analysis for similar master planning efforts, including hydraulic modeling and demand and fire flow analysis. He has developed and performed hydraulic modeling for clients across the nation, including Pacific states, Nevada, Texas, and Colorado, with trusted and credible results.

Relevant Experience
 Staff engineer for the Padre Dam Munic-
ipal Water District, California, Comprehen-
sive Facilities Master Plan. This project was
an update to the 2001 Integrated Facilities
Plan, which addressed water, wastewater,
and recycled water services within the Dis-
trict’s region through 2020. Responsible for
identifying pipe alignment with capacity lim-
itations and developing improvements ac-
cording to design criteria. Also developed a
capital improvement plan to assist the Dis-
trict with project implementation.
 Project engineer for the City of Fresno,
California, Wastewater Collection System
Hydraulic Model Update. Responsible for
recalibration of the existing hydraulic com-
puter model and development of dry and
wet weather flows. Developed improvement
projects to mitigate capacity deficiencies
and prepared the technical report.
 Project engineer for the City of Banning,
California, Integrated Master Plan. Responsi-
ble for calibrating the sewer hydraulic
model using InfoSWMM modeling software.

Performed a system evaluation under exist-
ing and future conditions and assisted in
development of a capital improvement plan.
 Staff engineer for the City of Modesto,
California, Wastewater Collection System
Master Plan. Responsible for recalibration of
the existing hydraulic computer model, de-
velopment of dry and wet weather flows,
development of improvement projects to
mitigate capacity deficiencies and cost esti-
mates for the capital improvements, and
preparation of the technical report. The pro-
ject also included development of future in-
frastructure to service projected growth.
 Staff engineer for the City of Oceanside,
California, Integrated Master Plan. Responsi-
ble for developing supporting documenta-
tion for the master plan and performing a
sewer system analysis.
 Project engineer for the City of Lemoore,
California, Integrated Master Plan. Responsi-
ble for construction of the City’s hydraulic
model using InfoSWMM software and cali-
bration of the model. The hydraulic model
was used to perform capacity analyses un-
der multiple planning years and aid in de-
velopment of the City’s capital improvement
plan.
 Staff engineer for the Inland Empire Util-
ities Agency, California, Wastewater Facilities
Master Plan Update, which includes plan-
ning for infrastructure needs for the
Agency’s collection and treatment systems
through the year 2035, with flow projections
up to 2060. Responsible for incorporating
alternatives into a hydraulic model, design-
ing infrastructure to support future develop-
ment and multiple flow diversions, and de-
veloping capital improvement cost esti-
mates.
 Staff engineer for the City of Modesto,
California, River Trunk Realignment, Beard
Brook Siphon, and Cannery Segregation
Line Improvements. Responsible for assist-
ing with design, sizing the new sewer align-
ment, and modeling the future system. Also
assisted with preparation of technical docu-
mentation outlining design criteria and
planning. Numerous alternatives were mod-
eled in an effort to present the City with via-
ble options.
 Project engineer for the City of Lake
Havasu, Arizona, Lift Station and Force Main
Analysis. Responsible for evaluation of lift
station and pump curves to determine com-
patibility with proposed configuration
 Project engineer for the City of Hender-
son, Nevada, Cadence Utility Master Plan
Joaquin D. Ramirez, P. E .

Update. Tasks included determining re-
quired backbone infrastructure for water
and sewer needs of the planned develop-
ment.
 Project engineer for the City of Visalia,
California, Sanitary Sewer Master Plan. Re-
sponsible for recalibrating the existing hy-
draulic computer model, developing dry
and wet weather flows, determining im-
provement projects to mitigate capacity de-
ficiencies, and preparing the master plan re-
port.
 Staff engineer for the City of Paso Ro-
bles, California, Recycled Water Distribution
System Design. Utilized hydraulic modeling
software to perform capacity analyses and
assist with pipeline design.
 Staff engineer for the City of Fresno, Cal-
ifornia, Recycled Water Model Develop-
ment. Responsible for construction of the
City’s recycled water hydraulic model. The
hydraulic model was used to perform ca-
pacity analyses under varied demand condi-
tions and evaluate the system’s existing ca-
pacity and future needs.
 Project engineer for the City of Santa Fe,
New Mexico, Reuse Pipeline Conveyance
Hydraulics and Alternatives. Performed hy-
draulic analysis to evaluate the feasibility of
using existing pipeline to convey reclaimed
water from the reclamation facility to the Rio
Grande River.
 Staff engineer for the City of Turlock,
California, Facility sizing and Preliminary De-
sign Report. Updated the City’s distribution
system hydraulic model to aid in sizing a
new storage tank, booster pump station,
and pipeline expansion.
 Staff engineer for the City of Tulare, Cali-
fornia, Matheny/Soultz Water System Im-
provements. Updated the City’s existing hy-
draulic water model and performed capacity
analyses of the City’s supply, storage, and
pipelines.
 Staff engineer for the City of Porterville,
California, Integrated Water and Storm
Drain Master Plans. Utilized the City’s hy-
draulic models to perform capacity analyses
of the water distribution system and storm
water conveyance system under multiple
planning years. Aided in development of
the City’s capital improvement plan.
 Project engineer for the City of Hender-
son, Nevada, Backbone Water Infrastructure
Study. Tasks included evaluation of the wa-
ter distribution system to determine the via-
bility of a new backbone pipeline configura-
tion.
 Staff engineer for the City of Clovis, Cali-
fornia, 2015 Urban Water Management
Plan. Responsible for updating the City’s
2010 Urban Water Management Plan. The
update included a description of the City’s
service area, water supply, reliability plan-
ning, water use, supply and demand com-
parison, water shortage contingency, and
water recycling.
 Staff engineer for the City of Merced,
California, 2015 Urban Water Management
Plan. Responsible for updating the City’s
2010 Urban Water management plan. The
update included a description of the City’s
service area, water supply, reliability plan-
ning, water use, supply and demand com-
parison, water shortage contingency, and
water recycling. The updated plan was ap-
proved by the City council.
 Investigated the influence of the San
Joaquin River flow on the migration of Chi-
nook salmon and evaluated ideal conditions
regarding migration.
 Collected data on greenhouse gas emis-
sions for the City of Chowchilla, California,
and compiled a report categorizing depart-
ment and equipment emissions.
 Staff engineer for the City of Fresno, Cal-
ifornia, Southeast Surface Water Treatment
Facility Design. Responsible for collecting
raw surface water samples for analysis, as-
sisting with jar testing, and cataloging field
data.

Education
BS Environmental
Engineering, University of
Colorado, Boulder, 2013
Licenses
Civil Engineer, Nevada
Professional
Affiliations
American Water Works
Association
Water Environment
Federation

Michael W. Wetterau, P. E .

Mike Wetterau has seven years of experience in master planning, hydraulic modeling, and capital improvement plan development. He provides assistance in the develop- ment and analysis of existing water conveyance and sewage collection systems, as well as development of technical memoranda and reports for evaluation of existing system information, data, and model analysis. Mike has experience with a variety of software packages, including InfoWater, WaterGEMS, H2OMAP Water, and EPANET.

Relevant Experience
 Staff professional for City of Chino Hills,
California, Citywide Wastewater Master Plan
Update. This ongoing project will update
and evaluate the City’s wastewater collec-
tion system hydraulic model. The project
scope also included coordinating with a
pipe inspection contractor to inspect up to
20 miles of pipeline.
 Staff professional for the City of River-
side, California, Comprehensive Wastewater
Master Plan, which included both treatment
and wastewater collection systems. Carollo
built the City’s collection system model us-
ing the Innovyze InfoSWMM modeling soft-
ware.
 Staff professional for the City of Tor-
rance, California, 2020 Sewer Master Plan.

This project involved sewer system model
development, calibration, analysis, and
preparation of a phased capital improve-
ment plan. Flow monitoring data was used
to calibrate the model for both dry and wet
weather conditions.
 Staff professional for the Central Contra
Costa Sanitary District, California, Collection
System Master Plan. The Master Plan ad-
dressed needs over the 20-year horizon for
the existing 40-mgd plant liquids treatment
(including biological nutrient removal
needs), sludge treatment and reuse/disposal
options (including incinerations plus diges-
tion), water reuse, and all other plant facili-
ties. Major plant upgrades and designs are
anticipated to follow the master plan. Re-
sponsible for evaluation of existing infor-
mation and hydraulic modeling.
 Staff professional for the City of Colton,
California, Water and Wastewater System
Master Plan Update. The Water and
Wastewater System Master Plan is part of a
larger effort to produce an Integrated Water
Master Plan for the City’s water and sewer
systems. The objective is to serve as a stra-
tegic planning guide for City staff to make
decisions and justify the need for improve-
ments to the City’s water and wastewater
systems with a planning horizon of year
2040. Responsible for hydraulic modeling,
including extended period simulation cali-
bration and fire flow calibration, as well as
existing system analysis for proposed im-
provements.
 Staff professional for the City of Shasta
Lake, California, 2016-2026 Water Master
Plan Update. Carollo developed a prioritized
capital improvement program that allows
staff to provide justification for project
needs, select from a list of prioritized pro-
jects, and develop a hydraulic model. The
hydraulic model can be used to conduct
analysis where development requests create
questions concerning the best approach to
provide water service for new customers
and existing City users. Responsible for hy-
draulic modeling.
 Staff professional for the City of Santa
Barbara, California, Montecito Negotiations
Water Purchase Agreement (WPA) Assis-
tance. Carollo helped negotiate a WPA with
the Montecito Water District that would be
based on the cost of additional seawater
desalination plant capacity and associated
infrastructure improvements in the City's
distribution system. Responsible for hydrau-
lic modeling.

Education
AAS Geographic
Information
Management, Green
River Community
College, 2013

Kevin R. Christensen
Kevin Christensen has eight years of experience managing complex datasets in geo- graphic information systems (GIS) for analysis and visual representation. He utilizes a variety of ArcGIS tools and geo-processes to create and manage complex maps suit- able for engineering review and public-facing web publishing. Kevin has been in- volved in master planning projects with Carollo planning teams across the west coast.

He has created map documents, analyzed GIS data, and linked non-spatial data to GIS.

Relevant Experience
 GIS analyst for the Integrated Water
Wastewater Resources Management Plan
for the City of South Pasadena. This first-
ever master plan for the City encompasses
its water, wastewater, and stormwater sys-
tems, and explores the feasibility of a recy-
cled water system. Hydraulic models and
system GIS updates were prepared for the
water, sewer, and recycled water system,
while stormwater management opportuni-
ties were explored. The findings were com-
bined in a comprehensive master plan re-
port and integrated CIP that will guide the
City with major infrastructure investments
through year 2050.
 GIS analyst for the Padre Dam Municipal
Water District, California, 2020 Comprehen-
sive Facilities Master Plan Update. This inte-
grated master plan involves updating the
District’s water, wastewater, and recycled
water infrastructure. This project includes
(recycled) water demand/sewer flows fore-
casting, water supply analysis, hydraulic
modeling updates for the water and recy-
cled water systems, development and cali-
bration of a new sewer model, and field
condition assessment of key facilities with
operations staff.
 GIS analyst for the City of Torrance, Cali-
fornia, 2020 Sewer Master Plan. This project
involved sewer system model development,
calibration, analysis, and preparation of a
phased capital improvement plan. Flow
monitoring data was used to calibrate the
model for both dry and wet weather condi-
tions.
 GIS analyst for City of Chino Hills, Cali-
fornia, Citywide Wastewater Master Plan
Update. This ongoing project will update
and evaluate the City’s wastewater collec-
tion system hydraulic model. The project
scope also included coordinating with a
pipe inspection contractor to inspect up to
20 miles of pipeline.
 GIS analyst for the City of Oxnard, Cali-
fornia, Public Works Integrated Master Plan.

Responsible for creating map documents
that show the City’s sanitary sewer, potable
water, reuse water, and stormwater systems.
 GIS analyst for the City of Modesto, Cali-
fornia, Wastewater Collection Master Plan.

Responsible for creating map documents
that show the City’s sanitary sewer system
and land use data.
 GIS analyst for the City of Glendale, Cali-
fornia, 2013 Integrated Master Plan. Respon-
sible for creating figures displaying the City’s
water system.
 GIS analyst for the City of Cottage
Grove, Oregon, Storm Drainage and Sani-
tary Sewer Master Plan Update. Responsible
for updating and creating new figures for
the Cottage Grove Sanitary Sewer and
Storm Drainage Master Plan update.
 GIS analyst for the for the Lake Wash-
ington Sewer Lake Line Management Plan
for the City of Bellevue, Washington. Provid-
ing a Programmatic Management Plan for
the replacement, rehabilitation, and/or re-
configuration of approximately 14.6 miles of
Bellevue lake line sewer pipe along the Lake
Washington shoreline. The Plan includes
phased capital improvements, operational
strategies, and policy recommendations to
maintain the current level of service.
 GIS analyst for the Downtown
Wastewater Model for the City of Tacoma,
Washington. The detailed collection system
model includes wastewater basins in the
downtown area that could have higher den-
sity development than was previously
planned due to proposed projects. The in-
creased in density will increase future flows
Kevin R. Christensen

in the area. The impacts of the proposed
downtown redevelopment and distribution
of different project types on the wastewater
system capacity will be determined using
the detailed hydraulic model.
 GIS analyst for the Wastewater System
Resiliency Plan for the City of Gresham, Or-
egon. This plan identifies system-wide im-
provements needed to strengthen all ele-
ments of the wastewater system to shorten
the recovery time and reduce risk for both
the CSZ earthquake and the Maximum
Considered earthquake. The resiliency plan
will provide the City with a prioritized list of
recommended improvements for
wastewater treatment plant buildings, pro-
cess structures, pump stations, and collec-
tion system pipes including creek crossings.
 GIS analyst for the Navy Yard City,
Washington. Responsibilities include con-
verting a list of sewer defects captured by
the client into a figure for analysis. The anal-
ysis was based on the type and severity of
sewer defects within the Navy Yard City
sewer system to create a heat map of pos-
sible problem areas. Engineers then took
steps to create a set of proposed improve-
ments to the sewer system in the Navy Yard
City area.
 GIS analyst for the City of Auburn,
Washington, Water System Plan Update.

Assisted in editing map documents that
display the City’s current and future water
system.
 GIS analyst for the City of Bainbridge
Island, Washington, Water System Plan.

Assisted in editing the water system and
land use map documents.
 GIS analyst for the City of Auburn,
Washington, Water Model On-Call Services.

Involved in developing a set of unidirection-
al flushing program map documents. Re-
sponsible for creation of proposed direc-
tional flushing map figures that display the
direction the pipes are flushing.
 GIS analyst for the City of Stanwood,
Washington, 2014 Water System Plan up-
date. Updated the map documents based
on a new influx of data. Duties included
updating the capital improvement program
and land use map documents.
 GIS analyst for the City of Bellevue,
Washington, Comprehensive Water System
Plan Update. Conducted an industry survey
of storage criteria to benchmarks the City’s
criteria and recommend updates. Evaluated
required storage volumes and identified
future deficiencies for the City’s 26 reser-
voirs. Storage improvement projects were
sized to eliminate future deficiencies. In-
cluded planning for establishing emergency
wells from existing, unused groundwater
wells.
 GIS analyst for the City of Ashland, Ore-
gon, TAP Emergency Supply Project. The
project involved developing a transmission
main to go from the City of Talent, Oregon,
to the City of Ashland to relieve drought
conditions. Responsible for mapping the
water system improvements including the
new pump station and new transmission
main.
 GIS analyst for the City of Lebanon, Ore-
gon, Raw Water Intake Feasibility Study.

Responsible for creating figures that
showed the conceptual plan for a raw water
pipeline connecting proposed facilities.
 GIS analyst for the Bella Vista Water Dis-
trict, California, 2010 Urban Water Manage-
ment Plan. Assisted in population projec-
tions for the service area and created figures
displaying the water system and population
projections.
 GIS analyst for the City of West Sacra-
mento, California, Water Master Plan Up-
date. Responsible for creating and editing
map documents that displayed the water
distribution system and land use data.
 GIS analyst for the City of Modesto, Cali-
fornia, River Trunk Realignment, Bead Brook
Siphon and Cannery Segregation Project.

Responsible for creating figures that
showed the existing alignment, problem
areas, and recommendations for the project
area.

Education
BS Civil Engineering,
California State
University, Long Beach,
1995
Licenses
Professional Engineer,
Colorado, Texas,
Civil Engineer, Arizona,
Nevada, Washington,
Washington D.C.

Certification
Certified, PAC Program
Trainer of PACP Users to
include Manhole Module,
National Association of
Sewer Service Companies
(NASSCO), May 2010
Certified, ITC Program for
CIPP Inspector,
(NASSCO), August 2010
Certified, ITC Program for
Manhole Rehabilitation
Technologies Inspector,
NASSCO, January 2013
Professional
Affiliations
National Society of
Professional Engineers
American Society of Civil
Engineers
American Public Works
Association
Society of American
Military Engineers

Greg A. Gould, P. E .

Greg Gould, an Associate Vice President with Carollo, joined the firm in 2007 and has over 26 years of experience in civil engineering design, construction, and project management for water distribution systems, gravity sewer and storm collection sys- tems, force main systems, industrial infrastructure, lift stations, pumping stations, condition assessment, trenchless technology applications, and rehabilitation projects.

Greg specializes in infrastructure projects with experience covering a wide range of water, wastewater and storm drain infrastructure applications for general, public, and city agencies. His experience includes hydraulic and master plan modeling and design related software. He has designed pipelines ranging from small collector sewers and water distribution lines to major pipelines up to 134 inches in diameter. He is also a certified NASSCO PACP/MACP Trainer.

Relevant Experience
 Project manager for the Eastern Munici-
pal Water District (EWMD), California –
Warm Springs Lift Station Condition Assess-
ment Project. The project involved the con-
dition assessment of the 30-year old lift sta-
tion and 15,600 linear feet of the two influ-
ent sewers, including 52 manholes. To avoid
manned entry into the aging lift station wet
well, a drone was used to capture video
footage of the internal condition. Multi-sen-
sor (LiDar/Sonar/high resolution video foot-
age) of the two sewers and manholes were
captured and assessed. For the lift station, a
comparison was made between construct-
ing a new lift station or rehabilitating the ex-
isting station from a dry-put configuration
with horizontal centrifugal pumps to a sub-
mersible wet-well configuration. Ultimately,
EMWD chose to design and construct a
new lift station.
 Project engineer review for the Eastside
Interceptor Section 2 Rehabilitation, Phase 1,
for King County, Washington. Project in-
cludes the preliminary engineering for the
trenchless rehabilitation of approximately
5,000 feet of 96-inch diameter concrete
sewer in Renton. The preliminary engineer-
ing will include the analysis of a sewer by-
pass system capable of handling up to 70
mgd, cultural resources, environmental
studies, including noise analysis, odor con-
trol, risk analysis, and project permitting.
 Project engineer for the Headworks Re-
habilitation and Expansion at Plant 1 (P1-105)
project for the Orange County Sanitation
District (OCSD), California. Carollo is leading
the design of a major upgrade of head-
works and associated facilities at Orange
County Sanitation District’s Plant No. 1. This
project, P1- 105, is a complex retrofit of criti-
cal facilities that must remain in service
throughout construction. This project re-
pairs, refurbishes, replaces, and upgrades
the Plant 1 Headworks facilities to a “like
new” level of service. When finished, the
Plant 1 Headworks, with a peak capacity of
320 mgd, will operate reliably for at least
another 20 years with only routine mainte-
nance and operator attention.
 Project engineer for the C-Line Condi-
tion Assessment for the South Tahoe Public
Utility District, California. The project in-
cluded a condition assessment of the exist-
ing 68,000-foot long, 18-inch to 21-inch di-
ameter, mortar-lined and coal tar epoxy
coated steel C-Line pipeline and an evalua-
tion of the economic viability of designing
and constructing a hydroelectric power fa-
cility. The condition assessment work in-
cluded CCTV videotaping, soil resistivity
testing, ultrasonic wall thickness testing, and
laboratory testing. The condition assess-
ment results were used to recommend tar-
geted rehabilitation and/or replacement of
the C-Line pipeline.
 Project engineer for the Condition As-
sessment and Emergency Rehabilitation De-
sign and Construction Project for Victor Val-
ley Wastewater Reclamation Authority, Vic-
torville, California. Carollo investigated
30,000 linear feet of a 27-inch interceptor
consisting of vitrified clay pipe (VCP) and
steel pipe using CCTV and sonar technol-
ogy. The investigation revealed a failed lin-
ing within a steel pipe beneath a three-track
railroad spur that was installed without a
casing sleeve. Carollo prepared a fast-
Greg A. Gould, P. E .

tracked cured-in-place pipe (CIPP) design
based on E-80 loading, and the project was
successfully constructed with an ultraviolet
(UV) cured CIPP installation. HDPE bypass
piping was required to allow rehabilitation.
 Project engineer for the Albuquerque
Bernalillo County Water Utility Authority,
New Mexico - Westside Interceptor at
Yucca/Central. The project consisted of ap-
proximately 3,600 feet of 42-inch, 540 feet
of 36-inch, and 200 feet of 15-inch fiberglass
reinforced polymer mortar pipe sanitary
sewer. The project also included five IPEX
vortex drop structures to handle the drops
in elevation in the 42-inch sanitary sewer.
 Design manager for the Sewer Rehabili-
tation Group C Project for the City of Las
Vegas. The project elements included devel-
opment of a new validation condition as-
sessment based on new CCTV coverage
and 2004 CCTV coverage and condition as-
sessments for 9,500 linear feet of 15-30
inches in diameter VCP and reinforced con-
crete pipe (RCP) including approximately 75
brick and precast concrete manholes. The
work included performing a condition as-
sessment report, rehabilitation design for
full CIPP and point repairs with UVCIPP and
an epoxy coating system for the manholes,
bid phase services, and engineering services
during construction. In addition, developed
new City standard specification section to
cover point repairs.
 Project manager for the TRA Mountain
Creek 30MC-1 Interceptor Project, Texas.

This project included a condition assess-
ment using simultaneous laser, sonar, and
CCTV digital image capture, estimation of
remaining useful life of existing 54-inch and
78-inch unlined RCP pipelines. This project
also included the final design and evaluation
for the existing 54-inch interceptor, remov-
ing and replacing the existing interceptors
with 7,000 lineal feet of 90-inch diameter
FRPMP gravity sewer interceptor and man-
holes, and alternatives analysis including
cost/benefit ratios. The project also incorpo-
rated approximately 250 lineal feet of
trenchless crossing of the Union Pacific Rail-
road, crossing of Mountain Creek, design of
a flow diversion structure, associated bypass
pumping, SWPPP, dewatering, repair of
fences and gates, erosion control, traffic
control provisions, trench safety system, and
permitting.
 Technical advisor for Trinity River Au-
thority Henrietta Creek (25HC-3) Relief In-
terceptor Project, Texas. This rehabilitation
project included a condition assessment of
13,000-LF of 24-inch unlined RCP pipeline
using CCTV digital image capture. The pre-
liminary engineering evaluation of rehabili-
tation options recommended a new 48-inch
and 54-inch parallel pipeline and manholes.

Work includes the detailed final design and
construction of the new parallel pipeline,
bypass pumping, dewatering, stream cross-
ings, fence repairs and gates, erosion con-
trol, traffic control provisions, trench safety
system, SWPPP, and permits.
 Technical advisor for the Elm Fork Pipe-
line Rehabilitation Project for the Trinity
River Authority, Dallas, Texas. This rehabilita-
tion project included a condition assess-
ment using simultaneous laser, sonar, and
CCTV digital image capture, estimation of
remaining useful life of existing 8,000 feet of
72-inch unlined RCP pipeline, and prelimi-
nary engineering for the rehabilitation or re-
placement of the pipeline.
 Technical advisor for the City of Simi
Valley, California, FY 2010-2011 Sanitation
Sewer Trunk Rehabilitation Capital Improve-
ments. The project included four separate
projects totaling over 9,000 feet of sewer
line rehabilitation using CIPP for 20-inch
and 33-inch sewer pipe. The original pipe
material was either RCP or VCP gravity
sewer. Duties included bypass pumping lay-
out and design with 18-inch HDPE pipe,
CIPP design drawings and specs, CCTV re-
view, utility coordination, and coordination
with traffic control.
 Technical advisor for the City of Fresno,
California, Chestnut Avenue Sewer Rehabili-
tation. The project involved rehabilitation
design for 1,250 linear feet of 15-inch un-
lined RCP. The project included site investi-
gations, utility research; coordination of ge-
otechnical and surveying efforts; develop-
ment of plans, specifications, and cost esti-
mate; bidding support; and construction
support.

Education
PhD Engineering and
Industrial Applied
Mathematics, Claremont
Graduate University, 2003
MS Mechanical
Engineering, University of
Louisiana, Lafayette, 1988
BS Mechanical
Engineering, University of
Louisiana, Lafayette, 1987
Licenses
Mechanical Engineer,
California, Kansas,
Colorado
Professional Engineer,
Florida
Certification
Certificate, Managing
Energy in Water and
Wastewater Systems,
University of Wisconsin,
Madison, 9/30/08
Certified, Energy
Manager, Association of
Energy Engineers,
12/31/09
Certified, Green Building
Engineer, Association of
Energy Engineers,
12/31/09
LEED Accredited
Professional, Green
Building Certification
Institute, 10/21/08
Professional
Affiliations
American Society of
Heating, Refrigeration,
and Air Conditioning
Engineers

Khalil Kairouz, Ph.D., P .E.

Dr. Khalil Kairouz, an associate, has experience in planning, process design, and con- struction services for conventional and advanced water and wastewater treatment projects. His design projects include pump stations; ion exchange, demineralization, odor control, and chemical feed facilities; boilers; heat exchangers; blowers; emer- gency standby generators; compressor facilities; pressure vessels; emergency chlorine scrubber systems; heating, ventilating, and air conditioning systems; tertiary filtration; and reverse osmosis.

Relevant Experience
 Project manager for the Felton Booster
Station Upgrades project for the City of
Santa Cruz, California. The project included
demolishing of existing pumps and design
of a new pumping facility expanding the
pump station from 6-mgd to 16-mgd. The
project consisted of surge and hydraulic
analysis of the water distribution piping sys-
tem, design of five vertical turbine can-type
pumps, each with a 700-hp variable fre-
quency driven pump, along with associated
electrical, instrumentation, and HVAC. The
project also included a 1,250-kW standby
generator facility.
 Project engineer for the recycled water
facilities project at RP-1 and RP-4 for the In-
land Empire Utilities Agency, California. The
project included design of two pump sta-
tions totaling 44 mgd in capacity. Each
pump station includes nine motor and en-
gine-driven vertical turbine pumps with as-
sociated hydraulic and surge analysis, pip-
ing, instrumentation, and controls.
 Project engineer for the Irvington Equali-
zation Storage Facilities project for the Un-
ion Sanitary District, California. Responsibili-
ties included upgrade and expansion modi-
fications to the existing pump station, which
consisted of replacing the existing pumps
with new solids handling, motor-driven,
horizontal dry-pit non-clog type pumps, ex-
panding the pump station to a total capac-
ity of 44 mgd, and meeting the NFPA 820
requirements. Performed the hydraulic
modeling of the piping distribution system
and designed the pumping system with as-
sociated structures, piping, HVAC, and in-
strumentation and controls. Designed a
1,500-kW diesel standby generator facility, a
10,000 cfm odor control facility with air col-
lection system from the pump station, and
equalized storage facilities. The odor control
facility included two-stage chemical scrub-
bers followed by carbon adsorbers with
caustic, bleach, and acid-cleaning chemical
systems.
 Project manager for the pump station
and water distribution expansion project for
the Padre Dam Municipal Water District,
California. The project included hydraulics
and surge/control studies for several water
distribution pipelines with capacities totaling
32 mgd, upgrading and expanding four
pump stations with eight vertical turbine
pumps, each pump with a 600-hp motor
and associated control valves, piping sys-
tems, and controls. The project included a
bulk liquid sodium hypochlorite disinfection
facility with associated equipment and
SCADA controls.
 Lead engineer for the Southpark Pump
Station project for the Orange County Pub-
lic Facilities and Resources Department, Cal-
ifornia. Assisted in the design of a flood
control pump station that consisted of three
1,200-hp dual-gas fuel, engine-driven, axial
mixed flow pumps with a total capacity of
300 mgd. Also witnessed and supervised
factory and field testing, and assisted in
start-up of the pumps.
 Project manager for the 72-mgd Arrow-
head Pump Station engine retrofit and re-
placement project for the San Bernardino
Municipal Water Department, California.

The project included replacement of two ex-
isting engine-driven pumps with new solids
handling, non-clog, lean-burn, engine-
driven vertical dry pit pumps, and retrofit-
ting two existing engines with air/fuel ratio
controllers and catalytic converters. The
project also included design of chemical
odor scrubber systems, and upgrading the
ventilation system to meet NFPA 820 re-
quirements.

Khalil Kairouz, Ph.D., P .E.

Professional
Affiliations
American Society of
Mechanical Engineers
California Water
Environment Association
Water Environment
Federation

 Lead design engineer for the effluent re-
use pump station for the Water Reclamation
Facility Upgrade project for the Camrosa
Water District, California. Evaluated and
subsequently designed the modifications to
the effluent reuse pump station. The project
included modifications to the existing efflu-
ent pump station wet well and addition of a
vertical turbine pump to increase the sta-
tion's capacity from 3 mgd to 10 mgd. The
pump station lifts effluent to five intercon-
nected reservoirs located approximately two
miles away from the reclamation plant.
 Design engineer for the Tertiary Effluent
Pump Station Expansion as part of the facil-
ity expansion project for the Eastern Munici-
pal Water District, California. The existing ef-
fluent pump station has three electrical
pumps and one natural gas engine-driven
pump. Designed the new effluent pump
station with an 800-hp natural gas engine-
driven pump with the capacity to expand
the system to four engine-driven pumps.

The pumps are vertical turbines designed
for an operating pressure of 191 psi. This ef-
fluent pump station distributes water to a
district-wide network of pipes that supply
reclaimed water for recreational and irriga-
tion use.
 Project engineer for the Pump Station P-
4 modifications project for the El Toro Wa-
ter District, California. The project included
modifications to the existing pumps with
new 5-mgd energy-efficient water booster
split-case type pumps to serve the ultra-
high zone distribution system. The project
also included a surge analysis of a 600-kW
standby generator system, associated con-
trols, and heating, ventilating, and air condi-
tioning.
 Design engineer for the Swan Island
(West Side) CSO project for the City of Port-
land, Oregon. Assisted in the design of a
120-mgd pump station that incorporates
self-cleaning trench/wet well design and in-
cludes six submersible non-clog pumps in a
dry-pit where three of the pumps are varia-
ble frequency drive, 2,000-hp each and the
other three pumps are constant speed,
1,000-hp each.
 Project engineer for the Aeration Up-
grades to the Secondary System project for
the City of Riverside, California. Responsibili-
ties included modifications to the existing
aeration basins with new diffusers and pip-
ing systems, new aeration blower facility
consisting of five single-stage centrifugal
blowers by Turblex, each with a 700-hp mo-
tor. The blowers are designed to operate
with most open valve, dissolved oxygen,
and pressure controls.
 Mechanical engineer for the 3ASX Pro-
ject for the San Bernardino Municipal Water
Department, California. Responsibilities in-
cluded design of a 2-mgd booster pump
station with three variable frequency driven
vertical turbine pumps and provisions for
three additional pumps with a total capacity
of 13 mgd, a 13-ton emergency chlorine
scrubber system, and a sodium bisulfite
dechlorination facility.
 Lead design engineer for the
Wastewater Treatment Plant No. 3 Expan-
sion project for the City of Bakersfield, Cali-
fornia. Responsibilities included design of
two 70-foot diameter digesters with associ-
ated sludge heating system, a 32-mgd influ-
ent wastewater pump station consisting of
three vertical dry pit submersible pumps
with variable frequency drives, a 12-mgd fil-
ter effluent pump station consisting of three
vertical turbine pumps, a 10-mgd digester
sludge mixing pump station consisting of
three horizontal axial flow pumps, and a 1.5-
mgd pump station consisting of three pro-
gressive cavity pumps.
 Lead design engineer for the Primary
Hydraulic Reliability project for the San Ber-
nardino Municipal Water Department, Cali-
fornia. His responsibilities included the de-
sign of an automated three 30-hp each
plant and instrument air compressor facility.

The design consisted of an air receiving
tank, two refrigerated dryers, air filters, and
associated instruments and controls. The
design also provided the capability of auto-
matically and manually controlling and
monitoring the operation of the compres-
sors from the operation center room
through a supervisory control and data ac-
quisition system.

Education
MS Civil Engineering,
University of California,
Berkeley, 1994
BS Civil Engineering,
University of California,
Irvine, 1993
Licenses
Structural Engineer,
California, Oregon
Civil/Structural Engineer,
Washington
Civil Engineer, California
Professional
Affiliations
American Concrete
Institute
American Institute of
Steel Construction
James A. Doering, P .E., S.E.

James Doering, a registered structural and civil engineer, is Carollo’s structural lead engineer in Southern California. He manages structural design and evaluations for large and small projects. He has 27 years of experience in structural analysis, design, seismic retrofit, rehabilitation, review, and assessment for a variety of structures, such as wastewater and water treatment facilities, pump stations, reservoirs, tanks, clarifi- ers, large pipe supports, retaining walls, operations and maintenance facilities, office buildings, parking structures, post tensioned concrete structures, retail shopping cen- ters, and warehouses.

Relevant Experience
 Structural engineer for the Integrated
Master Plan for the City of Riverside, Cali-
fornia. The master plan identified expansion
and replacement needs for the City’s
wastewater collection system and expansion
of the Regional Water Quality Control Plant
from 40 mgd to 52 mgd. The wastewater
collection system is comprised of more than
1,100 miles of gravity sewers and 18
wastewater pump stations. The plant pro-
cesses consist of a headworks, primary clari-
fiers, a biological nitrogen removal activated
sludge process, secondary clarifiers, tertiary
filtration, and chlorination/dechlorination.

Solids processes include solids thickening,
anaerobic digestion, and centrifuge de-
watering. The project included the structural
condition assessment of the existing facili-
ties at the Regional Water Quality Control
Plant.
 Structural engineer for the 2018 Inte-
grated Master Plan for the City of Banning,
California. The plan involved the structural
condition assessment and recommenda-
tions for water, wastewater, and recycled
water systems that included pump stations,
welded steel tanks, prestressed concrete
tanks, bolted steel tanks, and well facilities.
 Structural engineer for the 2017 Facilities
Master Plan for Orange County Sanitation
District, California. This Master Plan develops
a 20-year capital improvement plan for the
District’s treatment plant and collection sys-
tem sewers and pump stations. Over the
20-year planning period, numerous District
treatment facilities and collection system
sewers and pumping facilities will need re-
habilitation or replacement, with a total cap-
ital expenditure of approximately $5 billion.

This Master Plan identifies the rehabilita-
tion/replacement needs and develops a
preliminary scope of work and planning
level cost estimate for each project.
 Structural engineer for the 2016 Water
Master Plan for Cucamonga Valley Water
District in Rancho Cucamonga, California.

Completed assessments of 10 steel water
storage tanks and numerous pump stations
and wells. Vulnerabilities were identified by
conducting both site visits and performing
cursory structural analyses. Recommenda-
tions and cost estimates for mitigation were
included in a report.
 Structural engineer for the 2019-2020
Willamette Facilities Plan for Clackamas
County Water Environmental Services near
Portland, Oregon. The scope of work in-
cluded the structural assessment of the
structural assets at the Kellog Creek WWTP,
Tri-City WWTP, and two lift stations.
 Structural engineer for the 2014 Water-
works Facilities Assessment for the City of
Simi Valley, California. Completed assess-
ments of more than 50 steel water storage
tanks and numerous pump stations. Vulner-
abilities were identified by conducting both
site visits and performing cursory structural
analyses. Recommendations and cost esti-
mates for mitigation were included in a re-
port.
 Structural engineer for the South Lift
Station project for Carson City, Nevada.
 Structural engineer for the Pump Station
Improvements project for the Padre Dam
Municipal Water District, California. Tasks
included the seismic retrofit of the roof-to-
wall connections at Pump Stations 1, 4, and

7.  Structural engineer for 870-2 Pump Sta-
tion Replacement for Otay Water District,
San Diego, CA. The project included a new
James A. Doering, P .E., S.E.

pump station with a capacity of 20 mgd,
designed with a pitched steel-framed roof
with CMU wall construction. In addition to
the pump room, the pump station building
also included rooms for sodium hypo-
chlorite storage, aqueous ammonia, stor-
age, electrical equipment, and permanent
emergency back-up generator.
 Structural engineer for the Fletcher Hills
2 Pump Station Replacement for Helix Wa-
ter District, in El Cajon, California. The pro-
ject included a new CMU building with
steel-framed gable roof to house pumps
and electrical equipment.
 Structural engineer for the Rockhoff
Pump Station Replacement for Rincon Del
Diablo MWD in Escondido, California. The
project included a new CMU building with
steel-framed gable roof to house new
pumps and electrical equipment.
 Structural engineer for the seismic eval-
uation of the Plant No. 1 preliminary treat-
ment facilities associated with the P1-105
Headworks Rehabilitation and Expansion at
Plant No. 1 Project for the Orange County
Sanitation District, California. Tasks include
performance of an ASCE 41-13, Tier 1 and
Tier 2 seismic evaluations for the existing
metering building, bar screen building, grit
screenings building, grit chambers, and
power building. Findings will be used for
long-range facility planning and the devel-
opment of seismic retrofit strategies.
 Lead structural engineer for the Los An-
geles Bureau of Engineers (LABOE) tertiary
expansion to the Terminal Island Water Rec-
lamation Plant in Los Angeles, California.

The project was a design-build effort that
included a new 2.0-MG rectangular con-
crete equalization tank and advanced water
treatment facilities. Challenges included
liquefaction mitigation using stone columns.
 Lead structural engineer for the San
Francisco Public Utilities Commission,
Southeast Water Pollution Control Plant,
SEP 020 Headworks Replacement Project.

The project includes a new 250-mgd head-
works facility that is about 375 feet long and
has integrated electrical, screening, grit
chambers, and grit handling processes. The
facility was designed with a deep foundation
system comprised of 125-ft long drilled con-
crete piers.
 Structural engineer for the seismic eval-
uation of Plant 1 & 2 facilities for Orange
County Sanitation District in Orange County,
California. The scope of work included eval-
uating more than 60 structures following
ASCE 41 and ACI 350 procedures. Structures
included single and multi-story process and
admin/service buildings, as well as, digest-
ers, basins, surge towers, and gas holders.

Both ground shaking and the response to
ground deformations due to liquefaction
were evaluated to identify vulnerabilities.

Conceptual structural and geotechnical mit-
igation strategies were then developed and
prioritized to assist the District with imple-
mentation into their Master Plan.
 Structural engineer for the 3.1-million
gallon stormwater tank at the San Diego
International Airport (Lindbergh Field). The
design-build project included a circular,
buried, cast-in-place concrete tank support-
ed on auger-cast piles with secant pile shor-
ing.
 Structural engineer for the Veolia Water
West Operating Services/City of Palm
Springs, California, Wastewater Treatment
Plant Upgrade. The project included a new
22 MGD capacity headworks with Parshall
flume and influent pump station, two new
100-ft diameter primary clarifiers with FRP
launders, a primary sludge pump station, an
elevated sludge degritting facility, odor con-
trol, replacement of the existing Digester
No. 2 floating steel dome with a new fixed
steel dome, and an electrical building.
 Structural engineer for engineering ser-
vices during construction for the $192 mil-
lion Headworks Replacement project for the
340-mgd Orange County Sanitation District
Wastewater Treatment Plant No. 2 in Hun-
tington Beach, California. The project in-
cluded facilities for metering, bar screening,
screenings handling, grit removal, grit han-
dling, odor control, chemical handling, and
power distribution. The project also includ-
ed an elevated 84-inch welded steel pipe
for temporary bypass to facilitate construc-
tion.

Education
BS Technology, University
of Houston, 1984
MS Environmental
Engineering, Loyola
Marymount University,
1997
Licenses
Civil Engineer, California,
Nevada

Megerdich "Miko" Aivazian, P. E .

Miko Aivazian has more than 29 years of experience in marketing, planning, design, and construction of facilities for environmental, industrial, and commercial projects.

He has been involved as a senior project/client manager and engineer for several water/wastewater projects for more than 24 years, including planning, study, design and construction management of pumping stations, reservoirs, pipelines, and water and wastewater treatment plants. He has managed the design and construction of many projects for major Southern California clients.

Relevant Experience
 Project manager for the Los Angeles In-
ternational Airport Recycled Water Main for
the City of Los Angeles Department of Wa-
ter and Power (LADWP), California. Task Or-
der No. ESC-31 involved design of a recy-
cled water pipeline main paralleling the I-
105 Freeway to provide recycled water for
landscaping purposes. This fast-track design
replaced the potable water usage for irriga-
tion purposes within the Los Angeles Inter-
national Airport. The pipeline was approxi-
mately 2,800 feet of 6-inch-diameter PVC
piping and approximately 600 feet of 3-inch
PVC piping within a heavy traffic area. The
design also included utility research to de-
termine size and locations of all utilities
within the project area. The project required
permitting and coordination with Caltrans
for placing a section of the pipeline within
Caltrans right-of-way. Also coordinated the
efforts between Los Angeles World Airports
(LAWA), LADWP, California Department of
Public Health, and Caltrans for the permit-
ting efforts. LADWP and LAWA design
standards were implemented and used for
this project.
 Project manager for the Elsinore Valley
Municipal Water District’s Diamond Re-
gional Sewer Lift Station (DRSLS) and Dual
Forcemains (DFMS) – DRSLS encompasses
three major components: New Lift Station,
New Dual Forcemains, and system improve-
ments and tie-in the existing sewer system.

DRSLS is a three phased project with a peak
flow capacity of 9, 14.8, and 19.9 mgd. The
phase 1 will construct the structure for the
ultimate phase three capacity and the
equipment will be installed to meet the
phase 1 peak flow capacity. The DRSLS also
includes a pre-treatment (Grinder) and an
odor control facility. The lift station is a Dry-
Pit Submersible type lift station with a depth
of approximately 45 feet. This project also
includes a DFM approximately 3,100 feet
long, one 24-inch and one 16-inch inside di-
ameter HDPE pipelines. Miko has been co-
ordinating the design of this project with the
District as well as the subconsultants and
other agencies.
 Project manager for the San Diego In-
ternational Airport/Sundt Stormwater De-
sign-Build Validation Phase for the San Di-
ego International Airport (SDIA); California.

Carollo was hired by Sundt Construction,
Inc. to provide design and engineering ser-
vices during construction for the proposed
stormwater storage tank known as Cistern
“C”. The Cistern C sizing was based on the
Strategic Stormwater Master Plan (SSMP)
recommendations – Capture and Reuse
Project developed for the San Diego Airport
Authority. As part of the project, Carollo val-
idate the hydrology model with a 85% cap-
ture rate. The Cistern C was sized for 3.0 MG
storage capacity and included an inlet pipe,
overflow system and two submersible
pumps with an average 130 gpm serving as
the cistern outlet system. Carollo was also
responsible for the structural design of the
cistern that included a cast-in-place circular
tank with a diameter of approximately 160-
feet. Miko coordinated the sizing and de-
sign efforts during the schematic design,
design development, construction docu-
ments phases with the DB team and the Air-
port Authority and in now working con-
struction phase of this project
 Quality assurance/quality control for
Casa Loma Siphon 1 Seismic Retrofit project
for Metropolitan Water District of Southern
California. Carollo is providing preliminary
and final design of 1,000 feet of dual 104-
inch diameter pipelines at the Casa Loma
Fault Crossing.
 Project manager for the City of Pasa-
dena, California, Replacement of the Sunset
Megerdich "Miko" Aivazian, P. E .

Reservoir preliminary design project. The
project involved the seismic/structural eval-
uation of a 5.6-MG elliptical-shaped reser-
voir with a hopper bottom and wood-
framed roof originally constructed in 1888.

Operational strategies, rehabilitation/retrofit,
and replacement alternatives were consid-
ered. Findings and recommendations were
presented in a report with conceptual level
cost estimates.
 Project manager for the Inland Empire
Utilities Agency, California, Baseline Recy-
cled Water Pipeline Project. The Baseline
Recycled Water Pipeline Project at north-
eastern portion of the service area includes
an existing 24-inch diameter pipeline lo-
cated in Baseline Avenue will be extended
approximately 8,200 linear feet to Cherry
Avenue in the City of Fontana of which
4,500 linear feet will be along Baseline Ave-
nue and 3,700 feet will be along South Her-
itage Circle. The project will support recy-
cled water for landscape irrigation in medi-
ans, park ways, and parks which will increase
the beneficial reuse of recycled water by ap-
proximately 105 AFY. The pipeline extension
will be located within IEUA’s 1630 pressure
zone. There will be a potential to increase
recycled water usage in the future with lat-
eral branches from the 24-inch line pipeline
to the north and south of Baseline Avenue
and further east into the City of Fontana.

This project will provide water reliability by
reducing dependence on imported water
and maximizing the beneficial reuse of recy-
cled water.
 Project manager for the City of San Di-
ego, California, Pure Water Program, Task 7
– Morena Pump Station, Wastewater
Forcemain, and Brine Conveyance prelimi-
nary design. The Morena Pump Station was
constructed to divert flow from the (E) Mis-
sion Valley Interceptor, screen the flow, and
pump it through a 48-inch discharge
forcemain to the North City Water Reclama-
tion Plant (NCWRP). Discharged brine from
NCWRP was conveyed by a 24-inch brine
pipeline to an energy dissipater facility at
the same site location as the Morena Pump
Station. The brine discharge flows by gravity
along the same alignment as the
wastewater forcemain. The energy dissipater
facility reduces the flow velocity before the
brine is discharged into an existing 48-inch
sanitary sewer line. Provided civil design ser-
vices, including development of alignment
alternatives and 10-percent level design for
the pipelines and pump station. Responsible
for managing the project with City staff
from project conception and working with
permitting agencies, including Caltrans and
Railroad Authorities, for tunneling sections
of the pipeline alignment.
 Project engineer for the Terminal Island
High Pressure Effluent (HPE)/Low Pressure
Effluent (LPE) Pump Station and Pipeline for
the City of Los Angeles, Bureau of Sanita-
tion, Environmental Engineering Depart-
ment, California. The HPE/LPE system im-
provements upgraded the treatment plant’s
HPE and LPE wastewater pumping and dis-
tribution systems. The project replaced ex-
isting HPE and LPE pumping systems and
associated distribution piping. The work in-
cluded construction of a new 10-inch diam-
eter HPE ductile iron pipeline loop around
the treatment plant and connections to the
existing HPE and LPE local service pipes.

Equipment installation included a new wet
well isolation valve, 16-inch pump suction
header, five new horizontal pumps and
pads, valves, piping and supports/restraints,
a flow meter, surge tank, air receiver and
pad, air compressors and related piping.

This project was awarded a City of Los An-
geles Star Award.
 Project manager for the Chevy Chase
968 Booster Pump Station for the City of
Glendale, California. The pump station con-
sists of a tri-level below ground structure
with an above grade electrical and chemical
storage room. The pump station is
equipped with three 200-hp, 1,200-gpm
vertical turbine pumps. The new pumps are
capable of pumping either directly from the
reservoir or from the inlet/outlet piping to
the 1290 pressure zone. The pump station
design also includes surge protection for
the pumping system.

Resume

Kevin Krajewski, PE
Role: Senior Project Manager
Education
B.S., Mechanical Engineering,
University of California – Davis, 1995
Registration
Mechanical Engineer, CA (M31744)
Joined V&A
1996
Total Years of Experience
25 years
Training and Certifications
▪ Asbestos Awareness
▪ Confined Space Entry -Certified
▪ Basic CPR/First Aid
Publications
▪ “You Can’t Squeeze Wine from a Stone: The Success of
Napa Sanitation District’s I&I Reduction Program,”
WEFTEC Annual Conference, 2017 (Damron A.,
Winkelman M )
▪ “Collection System Flow Monitoring Technology at
EBMUD,” WEFTEC Annual Conference, 2009
▪ “Sacramento Regional County Sanitation District
Interceptor Sulfide Generation Model,” WEFTEC Annual
Conference, 2007
▪ “Ahead of The Flow,” Public Works Magazine, 2006
▪ “Oro Loma Sanitary District Bockman Lift Station: Flow Monitoring and I/I Analysis – A Case Study,” CWEA
Conference, 2004
▪ “Cost -Effective Collection System Assessment,” HWEA
Collection Systems Conference, 2003

Professional Summary
Kevin Krajewski is a se nior level project engineer,
engineering manager, division manager, practice
leader and respected industry leader for over 25
years. He is an entrepreneur who has combined
technical expertise and a strong work ethic to
transform a perceived the commodity service of
flow monitoring into a professional engineering
value -added service, growing the company
business and market share within thi s industry
from a start -up level into a sustainable multi -
million -dollar source of revenue generation for
V&A.

Kevin’s expertise includes flow monitoring and
analysis of inflow and infiltration (I/I) into
collection systems, including development of
synth etic I/I hydrographs and estimate of peak
wet weather flows for design storm events.

Relevant Experience

City of King City Wastewater Facilities Plan and
Collection System Master Plan Flow Mo nitoring,
King City, CA
V&A performed wet weather sanitary sewer flow
monitoring services within the City of King City
(City) to evaluate the inflow and infiltration (I/I)
rate into the City’s sanitary sewer system. The
work included flow monitoring; 10 op en-channel
flow meters at 9 sites and 2 rain gauges for 4
weeks, Light traffic control was required, along
with regular coordination with the District. V&A
coincidentally also helped the City determine
pipelines that differed from their sanitary map.

City of Tulare Master Plan Flow Monitoring,
Tulare, CA
V&A performed wet weather sanitary sewer flow
monitoring services within the City of Tulare (City)
to establish average dry weather flows and
evaluate the inflow and infiltration (I/ I) response
at 15 open -channel flow monitoring sites within
the City’s sanitary sewer system. The duration of
the work was 1 month; pipe sizes ranged from 12
inches to 42 inches in diameter. This project was
in support of a master planning effort.

City of Riverside Master Plan Flow Monitoring,
Riverside , CA
V&A performed wet weather sanitary sewer flow
monitoring services within the City of Riverside
(City) to e stablish average dry weather flows and
evaluate the inflow and infiltration (I/I) response
at 60 open -channel flow monitoring sites within
the City’s sanitary sewer system. The duration of
the work was 1 month; pipe sizes ranged from 8
inches to 51 inches in diameter. This project was
in support of a master planning effort.

City of Banning Master Plan Flow Monitoring,
Banning , CA
V&A performed wet weather sanitary sewer flow
monitoring services within the City of Banning
(City) to e stablish average dry weather flows and

Resume
evaluate the inflow and infiltration (I/I) response
at 9 open -channel flow monitoring sites within
the City’s sanitary sewer system. The duration of
the work was 1 month; pipe sizes ranged from 12
inches to 30 inches in diameter. This project was
in support of a master planning effort.

City of Lemoore Master Plan Flow Monitoring,
Lemoore , CA
V&A performed sanitary sewer flow monitoring
services within the City of Lemoore (City) to
establish average dry weather flows and identify
capaci ty issues at 15 open -channel flow
monitoring sites within the City’s sanitary sewer
system. The duration of the work was 2 weeks;
pipe sizes ranged from 10 inches to 18 inches in
diameter. This project was in support of a master
planning effort.

Central Contra Costa Sanitary District: Hydraulic
Model Updat e, Martinez , CA
V&A completed the sanitary sewer flow
monitoring and inflow and infiltration (I/I)
analysis within the District , including 5 rainfall
gauges . Flow and inflow and infiltration (I/I)
analysis was performed over a 2 -month period at
36 open -channel f low monitoring sites. The
purpose of this study was to measure sanitary
sewer flows at the flow monitoring sites and
estimate available sewer capacity and infiltration
and inflow (I/I) occurring in the basins upstream
from the flow monitoring sites. The da ta was
used to calibrate a new dynamic model for the
District. Particular challenges of this project
included understanding and overcoming the
differing and often challenging permitting issues
of all of the different contributing agencies (8
cities, 1 coun ty, Regional Parks, etc.). V&A
followed up this study by conducting flow
monitoring at 70 locations during the
2015/2016 wet weather season. CCCSD
previously had a static model and had not
conducted flow monitoring for over 10 years.

Capturing quality data to calibrate their newly
purchased dynamic model was a high-profile item
and of extreme importance to CCCSD.

Eastern Municipal Water District (EMWD)
Flow Monitoring & Model Calibration,
Moreno Valley, CA
V&A completed sanitary sewer flow monitoring
and rainfall monitoring with inflow and infiltration
analysis over a p eriod of approximately one
month at 55 open -channel flow monitoring sites
and five rain gauge locations. The purpose of this
study was to measure sanitary sewer flows that
can be used to calibrate the District’s hydraulic
model to prevent sanitary sewer ov erflow. V&A
also performed a condition assessment on the
diversion structures to confirm the flow routing in
the system. V&A was retained the following year
to conduct a similar flow monitoring and I/I
analysis study on a different area of the EMWD
system , which included 60 flow monitoring
location s for approximately one month .

Downtown City of Santa Monica Flow Monitoring.

Santa Monica, CA
V&A performed sanitary sewer flow monitoring at
for the City of Santa Monica 25 open -channel
sites over a two -week period in November 2015.

The purpose of this study was to establish the
baseline and peak flow conditions with results
used for an Environmental Impact Report. V&A
prepared a report summarizing peak recorded
dry weather flows, levels, d/D ratios, peaking
factors , and rim -to-invert measurements per site
during the flow monitoring period.

City of Anaheim Master Plan Flow Monitoring,
Anaheim, CA
V&A has completed sanitary sewer flow
monitoring and rainfall monitoring within the
west area of the C ity of Anaheim collection
system. The analysis was performed over a
consecutive 3 -month period with open -channel
flow meters at 15 sites and rain data collected
from four rain gauge locations. This study
established the baseline sanitary sewer flows at
the flow monitoring sites, estimated available
sewer capacity, isolated inflow and infiltration
(I/I) response, and included I/I analysis. V&A was
able to provide an approach that would allow
near zero velocities to be recorded and assure at
least a 97% up -time.

City of Davis Master Plan Flow Monitoring,
Davis, CA
V&A performed wet weather sanitary sewer flow
monitoring services within the City of Davis to
establish average dry weather flows and e valuate
the inflow and infiltration (I/I) response at 10
open-channel flow monitoring sites and 2 rain
gauge sites within the City’s sanitary sewer
system. The duration of the work was 6 weeks ;
pipe sizes ranged from 12 inches to 42 inches in
diameter. This project was in support of a master
planning effort.

JEFF GARCIA

Industry Tenure
2002 - Present

Certification
NASSCO
Pipeline Assessment

30 hour OSHA
10 hour OSHA
Medical
Services First Aid

CPR

Confined Space
Awareness

Education
Bachelor of Arts
Boston College
Jeff is responsible for supervising all phases of condition assessment projects including oversight and training of office and field staff. Jeff has extensive experience working on Sanitary Sewer Evaluation Study projects throughout the Western United States.

Jeff has over 19 years of sewer inspection experience and has experience in all phases of field evaluations. These include manhole inspections, sewer and storm inspections, flow monitoring, dye -test confirmation, smoke testing, building ins pections, cleaning large diameter pipe, GPS surveys and data collection, public relations, field management, quality control and assurance, and safety training. He has his OSHA 10 and 30 Construction Safety Awareness, Medical Services First Aid, CPR and Excavation Safety Training.

Relevant Recent Experience
• Cleaning, Inspecting, and UV Spot Repairs of Truss pipe for San Bernardino County Special Districts.
• Closed-Circuit Televising Services of Sewer Mains and Manholes – Santa Cruz County Sanitation District (Large diameter pipe cleaning and inspection, IBAK SI Manhole MACP Level 2 Inspections)
• City Wide Sewer Line Cleaning, CCTV Inspection and Manhole Inspection – City of San Gabriel, CA (Sewer cleaning and IBAK mainline scanning)
• Large Diameter Storm Drain Rehabilitation – CalTrans, (Large pipe cleaning and inspection)
• Trenchless Sewer Repairs – Coachella Valley Water District (Used Cosmic UV system to install 4’ spot repairs)
• Pipe Rehab with Sewer Laterals – LA County Sanitation Districts (dye testing, flow monitoring, cleaning, inspection, lateral bypass) • 75 Mile Condition Assessment – LA County Department Public Works (Clean and CCTV 75 miles of sewer pipe across multiple cities) • Sewer System Maintenance - City of Lynwood, CA
• CCTV Inspection, Citywide - City of Arcadia, CA
• Trunk Sewer Condition Assessment, LA County Sanitation District (Floating large trunk lines for cleaning/rehab)
• Sanitary Sewer Overflow Control Program Group 2 –
Sewer Rehabilitation – City of Los Angeles, CA

PAGE ͭ of Ͱ

November  5,  2021

SCOPE OF SERVICES (revised version ͭͭ/ͬͱ/ͮͬͮͭ)
ͮͬͮͭ SEWER MASTER PLAN
City  of  Gardena
TASK 1 - DATA COLLECTION AND MEETINGS
Carollo will prepare for and attend a project kickoff meeting to discuss project objectives and data needs for the project. Carollo will gather, collect, and examine all data supplied by the City, which is assumed to include electronic copies of as‐built drawings, past video inspections, maintenance records, the previous HͮOMap Model, the City’s sewer system utility map sets in CAD, land use, and other pertinent data in GIS.

Through this task, Carollo will develop a thorough understanding of the City’s wastewater collection system, including the operation and maintenance practices, existing and anticipated land uses and population within the City.

In addition to the kickoff meeting, this task includes up to five (ͱ) additional project meetings.

Deliverables: Data Collection List.

TASK 2 - SEWER CCTV SURVEY
The Carollo/National Plant Services Team will conduct Closed Circuit Television (CCTV) inspection of approximately ʹ miles of sewer mains not covered in the City’s most recent CCTV inspection round. The system will be inspected for general construction, condition and evidence of inflow, infiltration or surcharging. Pipe conditions in accordance with the National Association of Sewer Service Company’s (NASSCO) Pipeline Assessment and Certification Program (PACP).

We will document all observed substantial infiltration and inflow and critical structural damage or blockages, and provide corrections to the sanitary sewer system drawings, as appropriate.

Deliverables: CCTV inspection results and reports, CCTV and Manhole Inspection Findings Technical Memorandum (TM).

TASK ͯ ‐ MANHOLE INSPECTION
There are approximately ͮ,ͬʹͬ sewer manholes within City limits. As part of this task, the Carollo/National Plant Services Team will inspect all ͮ,ͬʹͬ manholes for general construction, condition and evidence of inflow, infiltration and surcharging. Manhole conditions will be documented in accordance with the NASSCO Manhole Assessment and Certification Program (MACP) Level ͭ. Traffic control will follow the WATCH Manual, and no parking signs will be posted ͳͮ hours before inspection. In addition to the NASSCO MACP Level ͭ inspections, National Plant Services will take manhole depth measurements at each manhole, as well as global positioning system (GPS) coordinates (X,Y) as well as elevation measurements (Z) at each manhole using ESRI’s Collector tool. This information will be used to help develop the City’s sewer system GIS database and hydraulic model.

Deliverables: Manhole inspection results and reports, CCTV and Manhole Inspection Findings TM.

PAGE ͮ of Ͱ
TASK 4 - FLOW MONITORING
The Carollo/V&A Team will collect flow and rainfall data for representative areas within the City’s wastewater collection system. Carollo recommends ͭͱ flow meters be installed for a duration of one month.

Extension beyond this timeframe can be provided as an additional service. The flow meters will be installed during a time period deemed to be the most conducive for capturing flows during significant wet weather periods. The recorded flow data will be organized and delivered to the City in electronic format.

Deliverables: Flow monitoring data and report.

TASK 5 - SEWER FLOW PROJECTIONS
Carollo will develop estimates of the existing dry weather and wet weather flows, and will develop future flow projections through year ͮͬͰͱ, consistent with the City’s urban water management plan (UWMP) horizon. The future flow projections will be based on information provided in the City’s General Plan, Specific Plans, and UWMP and Water Supply Assessment projections.

Deliverables: Existing and Future Flow Projections TM.

TASK 6 - LIFT STATION ASSESSMENT
Carollo will perform a field condition assessment of one (ͭ) lift station to assess the overall condition of the lift station and document any observed safety concerns/code violations, the reliability/redundancy of the lift station, and flood resilience. We will also document the capacity of the lift station based on as‐built drawings and available pump curves.

Deliverables: Lift Station Condition Assessment Findings TM.

TASK 7 - GIS AND HYDRAULIC MODEL DEVELOPMENT
Subtask 7.1 ‐ GIS Development
Carollo will prepare a GIS‐b ased database of the City’s collection system, including sewer main, manholes, County sewer lines/manholes, and lift station. The GIS database will be prepared using the City’s existing sewer system mapping (CAD format), which will be converted to GIS and all data necessary to complete the database (e.g., pipe inverts and diameter, manhole invert and rim, etc.). The sewer GIS will be compiled based on available information from the City (such as as‐built drawings or other existing data) and the manhole inspection data described in Task ͯ. The GIS database will have complete metadata and will be provided to the City in a shapefile format compatible with the City’s computerized maintenance management system (CMMS) platform. The coordinate system to be used for GIS data is NAD ͭ͵ʹͯ State Plane California Zone ͱ FIPS ͬͰͬͱ feet. Maps will be provided to the City as PDF and shapefile formats.

Deliverables: Complete sewer system map with attribute data in shapefiles compatible with City’s CMMS platform.

Subtask 7.2 ‐ Hydraulic Model Development and Calibration Using the GIS database prepared as part of Subtask ͳ.ͭ, Carollo will construct a hydraulic model of the sewer collection system in a software program approved by the City. The model will be calibrated against the flow monitoring data collected as part of Task Ͱ and updated to include existing and future peak dry and peak wet weather flow scenarios.

Deliverables: Collection System Hydraulic Model Files.

PAGE ͯ of Ͱ
TASK 8 - TECHNICAL MEMORANDUM ON EXISTING AND FUTURE WASTEWATER COLLECTION SYSTEM Carollo will develop a TM summarizing the results of the capacity analysis of the City’s collection system using the hydraulic model (developed as part of Task ͳ). The TM will identify locations in the wastewater system that have capacity constraints under existing and future peak dry and peak wet weather flow conditions. Carollo will also recommend the appropriate d/D criteria for the City as part of this task, and will develop capacity improvements to meet existing and future peak flow projections.

The Existing Wastewater Collection System TM will summarize the modeling software selection, the flow monitoring program, planning and evaluation criteria, hydraulic model development and calibration, existing and future system modeling results, and recommended capacity improvements.

Deliverables: Existing and Future Wastewater Collection System TM, Draft and Final.

TASK 9 - CAPITAL IMPROVEMENT PROGRAM (CIP)
Carollo will develop a CIP for the City’s collection system, based on the findings from Tasks ͭ – ʹ. The CIP will include Class ͱ estimates and phasing for projects needed to correct existing and future capacity deficiencies (as documented in Task ʹ) and condition (as identified in Tasks ͮ, ͯ, and Ͳ). The CIP will provide a prioritized list of recommended improvements for immediate (ͱ years), mid‐term (ͭͬ years) and long‐term (ͭͬ+ years) projects.

Deliverables: Prioritized CIP plan with detailed description of the project identifying deficiencies, improvements required and cost estimates.

TASK 10 - SEWER MASTER PLAN REPORT
The findings from Tasks ͭ‐͵ wil
l be documented in the Sewer Master Plan report, which will be prepared as part of this task. Carollo will submit a draft Master Plan report to the City in pdf and word document formats.

The draft report will be discussed in a project meeting. City comments on the draft report will be incorporated into a final report, which will be provided in pdf and word document format, as well as five (ͱ) hard copies.

Carollo will also prepare the City’s electronic CIP deliverables and ESRI story maps as part of this task.

Deliverables: Master Plan Report, Draft and Final; Electronic CIP and ESRI Storyboards.

TASK 11 - SEWER SYSTEM MANAGEMENT PLAN UPDATE
Carollo will prepare an updated Sewer System Management Plan (SSMP) in accordance with the State Water Resources Control Board (SWRCB) Order No. ͮͬͬͲ–ͬͬͬͯ WDR, and subsequent amendments, including the “SWRCB Informal Staff Draft – February ͮͬͮͭ Order WQͮͬͮX‐XXXX‐DWQ Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems” and incorporate design and technical information developed as part of the Sewer Master Plan above into the SSMP Update as appropriate. The SSMP document shall detail how the City’s sewer system is operated, maintained, repaired and funded, and will include all elements required to satisfy the State’s regulatory requirements.

Deliverables: SSMP Report, Draft and Final.

PAGE Ͱ of Ͱ
TASK 12 - SEWER DESIGN MANUAL
Carollo will prepare a Sewer Design Manual to provide guidelines for the analysis and design of sewer facilities in the City of Gardena. The manual may include, but not necessarily be limited to, the following sections:
ͭ. Sizing – Proposed sewer systems shall be designed based on tributary areas, land use, and population estimate. Minimum pipe size allowed shall be specified. ͮ. Modeling – The manual will provide guidelines for modeling existing condition, proposed development condition, and General Plan ultimate build out condition. ͯ. Capacity – The manual will list the maximum allowable capacity of proposed sewer line per range of pipe sizes.

Ͱ. Horizontal Alignment – The manual will provide guidelines on location, maximum deflection at bends, clearances to other facilities, etc.
ͱ. Vertical Alignment – The manual will provide guidelines on ground cover, slope, drops through manholes, clearances to other facilities, blanket protection, etc.

Ͳ. Materials – The manual will describe the pipe materials allowed by the City. ͳ. Soil Report – The manual will provide requirements for geologic investigation, soil unit weight, etc. ʹ. Bedding – The manual will provide guidelines on calculations, safety factor, and plan requirements. ͵. Manholes – The manual will include spacing, future stub, manhole type requirements, etc. ͭͬ. Lift Stations – The manual will provide requirements for lift stations. ͭͭ. Standard Details – The manual will provide a list of standard details acceptable to the City. ͭͮ. Easements – Easement requirements will be detailed in the manual to provide the City with the necessary access for maintenance of public sewer facilities outside of public right‐of‐way.

Carollo will submit the Draft Sewer Design Manual to the City for review. Comments from the City on the Draft Sewer Design Manual will be incorporated into the Final Sewer Design Manual.

Deliverables: Sewer Design Manual, Draft and Final.

TASK 13 - ON-CALL HYDRAULIC ANALYSIS (OPTIONAL)
Carollo will update the master plan hydraulic model as new developments are proposed. The scope of work for this task will consist of obtaining the development engineer’s sewer capacity analysis report/calculations and updating the master plan hydraulic model to verify that the additional sewer flow is within an acceptable range. This work will be conducted on a Time and Materials basis. For budgeting purposes, this optional task includes up to ͈ͯͬ,ͬͬͬ for on‐call hydraulic analysis.

FEE ESTIMATE (REVISED 11/5/2021)
2021 SEWER MASTER PLAN
City of Gardena
Hours by Classification
Lead Project
Professional
Project
Professional
Project
ProfessionalLabor
Subs and
Other Direct
Expenses(1)
Estimated
Fee
$312 $220 $175 $175 $175 $145 $125
Task 1 ‐ Data Collection and Meetings 8 46 24 16 4 0 0 98 20,300$          1,300$             21,600$ Task 2 ‐ Sewer CCTV S u r v e y 02 0 4 2 0 00 26 4,600$            62,400$          67,000$ Task 3 ‐ Manhole Inspection (2,080 Manholes) 0 2 0 24 80 0 0 106 18,600$          119,300$        137,900$ Task 4 ‐ Flow Monitoring 0 4 6 0 4 8 0 22 3,800$             90,400$          94,200$ Task 5 ‐ Sewer Flow Projections 2 4 16 36 0 6 0 64 11,500$           800$                12,300$ Task 6 ‐ Lift Station Assessm ent 2 2 30 0 36 4 4 78 13,700$           1,000$             14,700$ Task 7 ‐ GIS and Hydraulic Model Development 8 12 40 242 0 314 0 616 100,000$        8,000$            108,000$ Task 7.1 ‐ GIS Development 4 8 16 140 0 220 0 388 62,200$         5,000$            67,200$ Task 7.2 ‐ Hydraulic Model Development and Calibration 4 4 24 102 0 94 0 228 37,800$          3,000$            40,800$ Task 8 ‐ Technical Memorandum on Existing and Future Wastewater Collection System 8 10 28 50 0 6 8 110 20,200$          1,4 00$             21,600$ Task 9 ‐ Capital Improvement Program 6 8 24 38 0 14 0 90 16,500$          1,200$             17,700$ Task 10 ‐ Master Plan Report 8 8 26 52 30 10 8 142 25,600$          2,800$            28,400$ Task 11 ‐ Sewer System Management Plan Update 4 6 34 0 78 8 8 138 24,300$          2,300$             26,600$ Task 12 ‐ Sewer Design Manual 4 4 48 0 24 14 0 94 16,800$          1,200$             18,000$ Total Hours and Fee (without Optional Tasks) 50 108 276 462 276 384 28 1,584 275,900$      292,100$     568,000$ Task 13 ‐ On‐Call Hydraulic Analysis (Optional Task) 4 10 34 80 0 24 8 160 27,900$          2,100$             30,000$ Total Hours and Fee (with Optional Tasks) 54 118 310 542 276 408 36 1,744 303,800$      294,200$     598,000$ Notes:
(1) Other direct expenses include mileage travelling to/from meetings at IRS Federal Rate, reproduction at cost plus 5%, and Project Equipment and Communication Expense billed at $13.00 per hour. (2) Subconsultant costs include 5% markup
(3) Rates are based on 2021 billing rates
Total Hours
Task Description
Senior
Professional
Professional
Technician
Word
Processing
11/8/2021
City of Gardena
Gardena City Council Meeting

AGENDA REPORT SUMMARY
Agenda Item No. 15.C
Section: DEPARTMENTAL

ITEMS - PUBLIC WORKS
Meeting Date: February 8, 2022

TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE:

Award Construction Contract for the Police Station Sewer Pump Replacement Project, JN511, to OC Pump Company, in the Amount of $80,243.82 and Declare California Environmental Quality Act (CEQA) Exemption.

COUNCIL ACTION REQUIRED:

Staff Recommendations:

Award Construction Contract
Declare CEQA Exemption
RECOMMENDATION AND STAFF SUMMARY:

Staff respectfully recommends that City Council award the construction contract for the Police Station Sewer Pump Replacement Project, JN 511, to OC Pump Company, Anaheim, CA in the amount of $80,243.82 and declare this project to be categorically exempt under the CEQA, Class I, Section 15301 (d), as rehabilitation of existing facilities.

The project bids were solicited per the California Uniform Construction Cost Accounting (CUCCA) procedures and the City Resolution 6059, which projects up to $200,000 to be contracted by utilizing the prequalification list. The bids below were received by January 28, 2022, and OC Pump Company submitted the lowest responsive bid:

1 .

OC Pump Company $ 80,243.82
2 .

PumpMan SoCal $ 122,849.00
3 .

Jimni Systems $ 131,934.39
4 .

MMC Inc. $ 147,410.00

OC Pump Company is a state licensed specialty contractor established in 1948 with verified pump installation experience and is currently in the City's Informal Bidding Contractors list.

Their qualifications, participation in the mandatory job walk and understanding of the project make them ideally suited to remove and replace the Police Station's sewer pump system.

The current condition of the sewer pump system is considered poor at its best. One of the two pumps is no longer operational, which leaves the system without backup capability should the remaining pump fail. The remaining pump has developed cracking in the piping and is leaking and causing a foul order. The pump is also prone to clogging due to the age and condition of the overall system. As a result of the systems current condition, Public Works has targeted replacement of the pumps as a priority, and forecasted the replacement of the system in the month of April 2022 due to the availability and long lead time for delivery of the replacement pumps.

FINANCIAL IMPACT/COST:

Approved Budget Amount: $81,000
Funding Sources: Sewer Funds

ATTACHMENTS:

NOE_JN 511 Police Sewer Pump Replacement Final.pdf
NIB JN511 Final PDF.pdf

APPROVED:
___________________________________
Clint Osorio, City Manager

1 NOTICE OF INVITING INFORMAL BIDS/QUOTES
City of Gardena, California

Notice is hereby given that the City of Gardena is soliciting informal bids/quotes (Deliver, mail, or Email) at the office of the Public Works Department – Public Works Engineering, 1717 W. 162nd Street, Gardena, California, 90247 or [email protected] (Attn: Frank Sanchez), until Friday January 28, 2022, for:

PROJECT: POLICE STATION SEWAGE PUMP REPLACEMENT PROJECT, JN 511 (1718 W 162 Street, Gardena)

MANDATORY PREBID JOB WALK: 10 AM, Thursday, January 20, 2022 Contact – Frank Sanchez, (310) 217-9631

Any bid received after the hour stated above for any reason whatsoever, will be considered non-responsive and disqualified. The City reserves the right to withdraw or cancel this Notice Inviting Informal Bids/Quotes at any time without prior notification and the City makes no representations that any contract will be awarded to any contractor responding to the notice.

The City reserves the right to reject any or all bids and to waive any information or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive responsible bidder.

ABSTRACT:

The City of Gardena Police Station currently utilizes a dual pump sewage system that collects facility sewage and gray water for transfer to the City’s gravity feed sewer system. The pump system is in the basement of the City of Gardena Police Station. It has been in service for more than 20 years and is currently not fully operational. The system has been identified by the Public Works Department for a removal and replacement project to be completed in the 2022 calendar year.

SCOPE OF WORK:

The work required to remove and replace the existing pump system will include the following three (3) phases of work as described below:

2 PHASE 1

Removal and disposal of existing system components:

 Provide Vacuum tanker truck for removal of all liquid and debris from the sump.  Inspect sump for any damage that may require repair and provide a written report of inspection finding for review and repair approval.
 Remove and dispose of, but not limited to, existing pumps, motors, level controls, motor controls, valves, and piping.
 All removed material will become property of the contractor except for any items identified to be salvaged by the owner’s representative, (David McMichael, Lead Bldg.

Maintenance).
 Provide all tools, materials, and labor to prepare the existing sump and surrounding area for new system installation.

PHASE 2

Furnish and Install Dual Pump Sewage Pump System

 Furnish and install two (2) Deming 7366N-424-IR-32-N, 5 HP Chopper Pumps, 4-inch discharge, Hydraulic series 4m, 1750 rpm, 260 volt, 3 phase, impeller trimmed to 190mm, Impeller ductile iron explosion proof carbon/ceramic seals with 12/4, 18/4 30- foot cord. (Or approved equal)
 Furnish and install new Aluminum plates with access subplates to replace existing steel plates.
 Furnish and install two (2) 4” check valves, epoxy lined/coated with resilient disk.  Furnish and install two (2) 4” NRS gate valves, epoxy lined/coated with resilient wedge.  Furnish and install new pipe and new fittings for connection of pumps and valves to the existing discharge pipe.
 Pipe and fittings below the new cover will be Sch 80 PVC  Pipe and fittings above the new cover will be Sch 40 galvanized steel with grooved fittings.
 Furnish and replace two (2) 3” no-hub couplings on the waste vent.  Furnish and replace one section of 4” gravity sewage line to include one (1) new backwater valve.
 Furnish and install one (1) Duplex Pump System Control Panel with separate power disconnects, motor contactors, motor overcurrent protection, thermal cut outs, H-O-A switches, pump run pilot lights, pump alteration and submersible level transducer.

System Control Panel will be integrated to the Cities Emergency Back Up System. 3  Furnish and install four (4) non-mercury heavy-duty float switches with float anchor assembly
 Furnish and install moisture resistant conduit / fitting for protecting cords above the basin covers

PHASE 2.1

Alternate Additive Options

 Furnish and install Pump Portal Control System complete with Cellular Antenna and an Audible high-water alarm with silencer function.
 Furnish and install Automated Flushing System with safety shut of valve device.  System testing, staff training, and warranty transfer will be included in the unit price bid for each of the two (2) referenced alternative additive options and no additional compensation will be provided for these services.

PHASE 3

System Testing, Staff Training and Warranty Transfer

 Test the system for proper operation and completion
 Remove all debris, oils, paints, and liquids used in the installation of the Sewage Pump System.
 Provide training to City personnel for familiarization on the systems operation.  Provide all Contractor and Manufacture warranties in writing to city Maintenance personnel responsible for the project (David McMichael, Lead Bldg. Maintenance).  Relinquish complete project in a neat and clean manor to city Maintenance personnel responsible for the project (David McMichael, Lead Bldg. Maintenance).

TIME OF COMPLETION:

The time of completion of the contract shall be 15 working days as defined in the Standard Specifications for Public Works (Green Book), latest Edition. The GREENBOOK shall be referenced in case of any conflict and this special provision shall take precedence.

PAYMENT:

Payment for removing and replacing the Police Station Duplex Sewage Pump System will be made at the prices bid for the various phases / items of work contained in the bid schedule herein.
4 Selection will be made based on the comparison of base bid items and Alternate Additive Options. The winning bidder may be selected on the total cost of the base bid items or by the selection of base bid items and alternate additive bid items included.

The award of contract will require all phases selected to be completed in their entirety inclusive but not limited to, licenses, Labor, tools, and materials to provide a complete and operational installation.

Each bidder must submit a proposal to the City in accordance with this Notice Inviting Bids.

The contractor shall at the time of award possess a valid State of California Contractors license, license Class A, Class C-36, C-61 / D-21 classification and perform a minimum of 50% of the work.

Bidders are advised that this Project is a public work for purposes of the California Labor Code, which requires payment of prevailing wages. Accordingly, the bidder awarded the Contract and all subcontractors shall be required to pay not less than the prevailing rate of per diem wages, as determined by the Director of the California Department of Industrial Relations, and otherwise comply with the provisions of Section 1770 et seq. of the California Labor Code, California Code of Regulations, Title 8, Section 16000 et seq., and any other applicable laws, rules and regulations adopted with respect thereto (“California Prevailing Wage Laws”). Copies of such prevailing rates of per diem wages are on file at the Gardena City Clerk’s office and the office of the City Engineer, and copies shall be made available to any interested party on request. The prevailing rates of per diem wages referred to herein are hereby made a part of this Notice by reference.

Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by Contractor or any Subcontractor under it.

Contractor and any Subcontractor under if shall comply with the requirements of said sections in the employment of apprentices.

The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) in a format prescribed by the Labor Commissioner no less than monthly.

As of January 1, 2016, the requirement to furnish electronic certified payroll records to the Labor Commissioner will apply to all public works projects, whether new or ongoing.

5 Exceptions: The Labor Commissioner may (but is not required to) excuse contractors and subcontractors from furnishing electronic certified payroll records to the Labor Commissioner on a project that is under the jurisdiction of one of the four legacy DIR-approved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District, and County of Sacramento) or that is covered by a qualifying project labor agreement.

These requirements will apply to all public works projects that are subject to the prevailing wage requirements of the Labor Code without regard to funding source.

The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/index.htm).

Skilled and Trained Workforce: This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.

AWARD OF CONTRACT:

The following are conditions to award of the contract and required to be submitted to the City when Awarded (Reference Appendix “A”)

Any questions regarding this bid package may be referred to Frank Sanchez, Public Works Engineering Division at (310) 217-9631, [email protected] or David McMichael at (310) 738-9514.

1 BID SCHEDULE

CITY OF GARDENA

POLICE STATION SEWAGE PUMP SYSTEM REPALCEMENT
JOB NUMBER 511

Prime Contractor
Company:

Name:

Address:

City: Zip code:

DIR Number:

Phone Number:

Police Station Sewage Pump System Replacement
Phase Unit Quantity Unit Price Amount
Phase 1 – Removal and
Disposal of Existing System
components
LS 1 $ $
Phase 2 – Furnish Deming; 5
HP, 4-inch discharge, 460 Volt
3 Phase, Chopper Pump
EA 2 $ $
Phase 2 – Furnish and Install
Dual Pump Sewage Pump
System
LS 1 $ $
Phase 2.1 Furnish and Install
Alternate Pump Control
System with Cellular Antenna
Additive Option
LS 1 $ $
2 Phase 2.1 Furnish and Install
Alternate Automated
Flushing System with Safety
Shut Off Valve Device
Additive Option
LS 1 $ $
Phase 3 – System Testing,
Staff Training and Warranty
Transfer
LS 1 $ $

TOTAL CONTRACT BID:

(Figures) $

(Words) ________ ______
All work required for which no price or item is listed on this proposal shall be understood that such work, equipment, labor, tools and materials shall be provided without extra charge, allowance or direct payment of any kind. Payment for performing such work or furnishing such equipment, labor, tools and materials shall be included in the above lump sum or unit bid prices and no additional compensation will paid therefor.

If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid will be replaced as non-responsive.

In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the bidder’s intention and all totals will be corrected to conform thereto.

Name of Bidder

Signature of Bidder

APPENDICES

APPENDIX “A”: Sample Public Works Contract:
 Contract (To be submitted after award)
 Faithful Performance Bond
 Payment Bond
 Worker’s Compensation Insurance Certificate
(To be submitted with bid/quote)
 Designation of Subcontractors
(To be submitted with bid/quote)
 Non-Collusion affidavit
 (To be submitted with bid/quote)
APPENDIX “B”: Project Site Aerial Map

Small Public Works Contract
1 PUBLIC WORKS CONTRACT

POLICE STATION SEWER PUMP REPLACEMENT

PROJECT NO. JN 511

Small Public Works Contract
2 CONTRACT
PROJECT NO. (JN 511)

THIS CONTRACT is made and entered by and between THE CITY OF GARDENA, a municipal corporation (“City”) and (hereinafter "Contractor").

It is agreed by and between the parties that:

1. WORK

1.1 Contractor agrees to perform the following work for the City of Gardena as shown on the attached Notice of Inviting Informal Bids and submitted bid for:

PROJECT: CITY OF GARDENA, POLICE STATION SEWAGE
PUMP STATION REPLACEMENT PROJECT, JN511
(1718 W 162 nd STREET, GARDENA CA 90247)

1.2 Should City, at any time during the progress of the Work, request any alterations, deviations, additions or omissions, it shall be at liberty to do so, and the same shall in no way affect or make void the Contract, but will be added to, or deducted from, the amount of the Contract price, as the case may be, by a fair and reasonable valuation.

1.3 The Standard Specifications for Public Works Construction (“Greenbook”) shall be the Standard Specifications of the City. Unless otherwise indicated, the latest edition, including supplements, of the Greenbook shall apply.

2. SCHEDULE

2.1 Contractor shall commence and diligently pursue the Project to completion in Fifteen (15) working days, except as such time may be extended in writing by City.

2.2 If the Work called for under the Contract is not completed before the date specified, damage will be sustained by City and it will be impracticable to determine the actual damage which City will sustain in the event of such delay. Therefore, it is agreed that Contractor shall pay to City $200 per day for each and every working day's delay beyond the completion date. In the case the damages are not paid, Contractor agrees that City may deduct the amount from any money due or that may become due Contractor under the Contract. Compliance with the Greenbook is not required for liquidated damages to be assessed.

3. CONTRACT PRICE

3.1 City shall pay to Contractor as full consideration for the performance of the Work, the total sum of and 00/00 dollars ($ ).

4. PAYMENTS

4.1 If Contractor desires a progress payment, he shall invoice City for the amount of work satisfactorily completed and inspected as of the closure date. The invoice shall be

Small Public Works Contract
3 delivered to the City Engineer. All requests for payment shall be accompanied by the appropriate conditional waiver and releases in the form set forth in Civil Code section 3262. A five percent (5%) retention shall be retained on all payments. In the event of any claims, amounts determined by the City Engineer to be adequate to cover such claims shall be withheld from the retention payment until resolution of the claims.

4.2 Payment requests that are determined to be improper shall be returned to Contractor with written explanation within 7 days after receipt. The number of days available to make payment without incurring interest shall be reduced by the number of days by which City exceeds the 7-day return requirement.

4.3 Within 60 days of the date of completion and acceptance of the Work, City will pay to Contractor the amount remaining after appropriate modifications are made for change orders, liquidated damages, or any other of the provisions of which, by the terms hereof, City is or may be authorized or required to reserve or retain funds. Any moneys withheld beyond the allowable amount or prescribed time will accrue interest at a rate of two percent per month until such time that said moneys are released to Contractor, at which time withheld moneys and accrued interest shall be dispensed. In the event of a dispute between City and Contractor, City may withhold from the final payment an amount not to exceed 150 percent of the disputed amount.

4.4 In the event there is any claim specifically excluded by Contractor from the operation of any release, there shall be retained by City an amount not to exceed the amount of the disputed claim. In the event of a dispute after completion of the Project, City may withhold an amount not to exceed 150 percent of the disputed amount.

4.5 No claim shall be made or be filed and neither City, nor any of its elected or appointed officers, employees, agents, or volunteers shall be liable, or held to pay any money, except as specifically provided in the Contract. The acceptance by Contractor of the final payment when no securities or certificates of deposit have been deposited in escrow or with City, or his acceptance from the escrow agent or City of the securities or certificates of deposit substituted for the retention, whichever is later, shall operate as, and shall be, a release to City, and its elected and appointed officers, employees, agents, and volunteers, from all claims and liability to Contractor for anything done or furnished for, or relating to, the Project or for any act or neglect of City or of any person relating to or affecting the Project, except claims previously made as provided for and in accordance with the provisions of the General Conditions and pending at the time of acceptance of final payment or of the securities or certificates of deposit, or the claim against City for the remainder, if any there be, of the amounts kept or retained due to unpaid claims.

5. LEGAL REQUIREMENTS

State Requirements

5.1 Contractor, its agents and employees shall be bound by and shall comply with all applicable federal, state and local laws regardless of whether enumerated herein.

Small Public Works Contract
4 5.2 This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) in a format prescribed by the Labor Commissioiner no less than monthly. The State General Prevailing Wage Determination is as established by the California Department of Industrial Relation (available at http://www.dir.ca.gov/DLSR/PWD/index.htm).

Exceptions: The Labor Commissioner may (but is not required to) excuse contractors and subcontractors from furnishing electronic certified payroll records to the labor Commissioner on a project that is under the jurisdiction of one of the four legacy DIR- approved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District, and County of Sacramento) or that is covered by a qualifying project labor agreement.

A. AWARD OF CONTRACT: The following are conditions to the award of the contract:
i. Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relation pursuant to Labor Code Section 1725.5 subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Profession Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5 provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded): and

ii. No contractor or subcontractor may be awarded this contract unless the contractor and each subcontractor listed on the bid is registered with the Department of Industrial Relations pursuant to Section 1725.5.

Similarly, failure to comply with the registration requirements of Labor Code Section 1725.5, will disqualify a bidder or proposer.

These requirements will apply to all public works projects that are subject to the prevailing wage requirements of the Labor Code without regard to funding source.

5.3 In accordance with the requirements of the California Prevailing Wage Laws, Contractor and each Subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by it in connection with the work done under the Contract. The payroll records shall be certified and made available for inspection at all reasonable hours in accordance with the California Prevailing Wage Laws. Contractor shall be subject to, and fully comply with, all California Prevailing Wage Laws, including, but not limited to, those pertaining to the maintenance and inspection of certified payroll records.

Small Public Works Contract
5 5.4 Pursuant to California Labor Code section 1810 et seq., eight (8) hours labor constitutes a legal day's work. Contractor shall forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week, unless such worker receives compensation for all hours worked in excess of these hours at a rate of at least one and one-half times the basic rate of pay. (Labor Code § 1813.) City may withhold from any monies payable on account of work performed by Contractor or subcontractor, such sums as may administratively be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor, for unpaid wages and liquidated damages as provided for herein.

5.5 Contractor, and any subcontractor under Contractor, shall pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the Contract. (Labor Code § 1774.) Copies of the determination of the Director of the Department of Industrial Relations of the rate of per diem wages for each craft, classification or type of worker needed to execute the Contract are on file in, and available at, the office of City. (Labor Code § 1773.2.) When any craft or classification is omitted from the general prevailing wage determinations, Contractor shall pay the wage rate of the craft or classification most closely related to the omitted classification.

A copy of the prevailing rate per diem wages for cash craft or type of workman needed to execute any contract which may be awarded by City, may be requested by contacting the State Board of Equalization at (800) 400-7115.

5.6 Contractor shall post a copy of the prevailing rates at the work site(s), for the duration of the Work. (Labor Code § 1773.2.)

5.7 Contractor shall comply with all provisions of Labor Code section 1775. In accordance with Labor Code section 1775, Contractor shall forfeit as a penalty to City not more than $50.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor shall also pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate.

5.8 Nothing in this Contract shall prevent Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor shall have responsibility for compliance with California Labor Code Section 1777.5 and 1777.6 for all apprenticeable occupations. These sections require that Contractor and subcontractors shall submit contract award information to the applicable joint apprenticeship committee, shall employ apprentices in apprenticeable occupations, shall contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Board and that Contractors and subcontractors shall not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices as defined in Labor Code Section 3077, who are in training under apprenticeship standards and who have written apprentice agreements will be employed in apprenticeable occupations.

Small Public Works Contract
6 5.9 Contractor warrants full compliance with all laws regarding employment of aliens and others, and that all its employees performing services hereunder meet the citizenship or alien status requirements contained in federal and state statutes and regulations including, but not limited to, the Immigration Reform and Control Act of 1986 (P.L. 99- 603). Contractor shall obtain from all covered employees performing services hereunder, all verification and other documentation of employment eligibility status required by federal statutes and regulations as they currently exist and as they may be hereafter amended. Contractor shall retain such documentation for all covered employees for the period prescribed by law. Contractor shall indemnify, defend, and hold harmless, City, its elected and appointed officers, employees, agents and volunteers from employer sanctions and any other liability which may be assessed against City in connection with any alleged violation of federal or state statutes or regulations pertaining to the eligibility for employment of person performing services under this Agreement.

5.10 Neither Contractor, nor any subcontractor under Contractor, shall discriminate in the employment of persons, including apprentices, because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, sexual orientation or age of such person, except as provided in Sections 12940 and 12941 of the Government Code. Contractor shall have responsibility for compliance with this section. (Gov. Code §§ 12940, 12941.)

5.11 Contractor and all subcontractors shall, at Contractor and subcontractor's sole expense, obtain and maintain all necessary licenses for the Work, including but not limited to a valid business license, and give all necessary notices and pay all fees and taxes required by law.

5.12 Contractor shall be responsible for obtaining at its own expense, all construction permits, and licenses required by the City, including for any subcontracting firm engaged in construction/installation for this Project.

5.13 In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties. (Gov.

Code § 4552; Pub. Con. Code § 7103.5.)

5.14 Subcontractors who are ineligible pursuant to Labor Code sections 1777.1 and 1777.7 are ineligible to perform work under this Contract.

5.15 This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.

Small Public Works Contract
7 6. INDEPENDENT CONTRACTOR

Contractor is and shall at all times remain as to City a wholly-independent contractor.

Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, servants, agents, or subcontractors, except as set forth in the Contract Documents. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors, are in any manner officers, employees, agents or subcontractors of City.

7. INDEMNIFICATION

7.1 To the fullest extent permitted by law, Contractor hereby agrees, at its sole cost and expense, to defend, protect, indemnify, and hold harmless the City of Gardena and its respective elected officials, officers, attorneys, agents, employees, volunteers, successors, and assigns (collectively “Indemnitees”) from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith (collectively “Liabilities”), arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to any act, failure to act, error, or omission of Contractor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to the work performed under the Contract, or the performance or failure to perform any term, provision, covenant, or condition of the Agreement, including this indemnity provision.

7.2 This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence.

7.3 This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law.

7.4 Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against an Indemnitee shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision.

7.5 The prevailing party shall pay for reasonable attorney fees and costs incurred in relation to this indemnification provision.

7.6 Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a), or (b) the contracting

Small Public Works Contract
8 public agency’s active negligence to the limited extent that the underlying Agreement is subject to Civil Code § 2782(b).

7.7 This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under the Agreement or any additional insured endorsements which may extend to Indemnitees.

7.8 Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees.

Accountants, attorneys, or other professionals employed by Indemnitor to defend Indemnitees shall be selected by Indemnitees.

7.9 In the event there is more than one person or entity named in the Agreement as the Contractor, then all obligations, liabilities, covenants and conditions under this instrument shall be joint and several.

8. QUALITY ASSURANCE

8.1 All materials furnished, and all Work done under the Project shall be subject to rigid inspection. Work done in the absence of prescribed inspection may be required to be torn out and replaced and the entire cost of repair and replacement shall be borne by Contractor, irrespective of whether the work dismantled is found to be defective.

8.2 If the Work or materials, or any part thereof, shall be found defective any time before the final acceptance of the Project, Contractor shall immediately make good such defect without compensation in a manner satisfactory to the City, regardless of any previous inspection or estimation of such Work for payment.

8.3 If Contractor fails or neglects to make ordered repairs and/or replacement of damaged property within ten (10) DAYS after the service of an order to do such repair and/or replacement, the City, may make the ordered repairs and/or replacement and deduct the cost thereof from the monies due Contractor.

8.4 Prior to final acceptance, Contractor shall restore all areas affected by the work to the original state of cleanliness and repair all damage done to the premises, including the grounds, by his workmen and equipment.

9. INSURANCE

9.1 Commencement of Work. Contractor shall not be authorized to commence Work under this Contract until it has obtained approved insurance. Before beginning Work hereunder, during the entire period of this Contract, for any extensions hereto, and for periods after the end of this Contract as may be indicated below, Contractor must have and maintain in place not less than the insurance coverages required in this Section at his sole cost and expense. Contractor’s insurance shall comply with all

Small Public Works Contract
9 items specified by this Contract. Any subcontractors shall be subject to all of the requirements of this Section and Contractor shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Contractor’s insurance may cover all subcontractors. The insurance requirements are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Contractor under this Contract.

9.2. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

9.3 Coverages, Limits and Policy Requirements. Contractor shall maintain the types of coverages indicated below:

9.4 Comprehensive General Liability Insurance. A policy of comprehensive general liability insurance written on a per occurrence basis in an amount not less than either one million dollars ($1,000,000) per occurrence or two million dollars ($2,000,000) aggregate.

9.5 Commercial Auto Liability Insurance - a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, ed. 12/93, including Symbol 1 (any auto) with no special limitations affecting City. The minimum auto insurance coverage shall be one million dollars ($1,000,000) combined single limit per accident.

9.6 Worker’s Compensation and Employer’s Liability Insurance - a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars ($1,000,000) per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

In accordance with the provisions of section 1860 of the California Labor Code, Contractor's attention is directed to the requirement that in accordance with the provisions of section 3700 of the California Labor Code, Contractor and every subcontractor will be required to secure the payment of compensation of his or her employees, or obtain a certificate of consent to self-insurance by the Director of Industrial Relations in accordance with the requirements of Section 3700 of the California Labor Code.

In accordance with the provisions of section 1861 of the California Labor Code, Contractor shall sign and file with the awarding body the following certification prior to performing any work on the Project:

"I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for

Small Public Works Contract
10 worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."

9.7 Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:

(i) City and its appointed and elected officers, employees, agents and volunteers shall be added as additional insured to the policy as respects liabilities arising out of the performance of any work done under the Contract.

(ii) The insurer shall agree to provide City with thirty (30) days prior written notice, return receipt requested, of any cancellation, non-renewal or material change in coverage.

(iii) For any claims with respect to the Project covered by this Contract, Contractor’s insurance coverage shall be primary insurance as respects City and its elected and appointed officers, employees, agents and volunteers.

Any insurance or self-insurance maintained by City and its elected and appointed officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not contribute with it.

(iv) The policy shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company’s liability.

9.8 Course of Construction Insurance - Contractor shall provide course of construction insurance covering for “all risks” of loss in the amount of the completed value of the Work. The City shall be named as a loss payee and the insurer shall waive all rights of subrogation against the City. This policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled until thirty (30) days written notice, return receipt requested, is mailed to the City. Course of Construction Insurance may be provided for each separate Phase.

9.9 Additional Requirements. The procuring of required insurance shall not be construed to limit Contractor’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Contract. City shall notify Contractor in writing of changes in the insurance requirements. If Contractor does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Contractor shall be deemed in default hereunder.

9.10 Deductibles. Any deductible or self-insured retentions must be declared to and approved by City. Contractor shall guarantee that, at the option of the City, either:
the insurer shall eliminate or reduce such deductibles or self-insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Contractor); or Contractor shall provide satisfactory financial guarantee for payment of losses and related investigations, claim

Small Public Works Contract
11 administration and defense expenses in the amount of any deductibles or self- insured retentions.

9.11 Verification of Compliance. Contractor shall furnish City with the required endorsements attached hereto. All documents are to be received and approved by City before Work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Contract, Contractor shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefore, or accompanied by other proof of payment satisfactory to City. Contractor shall provide full copies of any requested policies to City within three (3) days of any such request by City.

9.12 Termination for Lack of Required Coverage. If Contractor, for any reason, fails to have in place, at all times during the term of this Contract, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Contractor’s expense and/or terminate this Contract. Contractor shall indemnify, defend and hold harmless City and its elected and appointed officers, employees, agents and volunteers from any claim resulting from failure of either Contractor or any subcontractor to take out or maintain any insurance required by this Contract.

9.13 Equipment Coverage

Any policy or policies of insurance Contractor or his subcontractors elect to carry as insurance against loss or damage to construction equipment and tools or other personal property shall include a provision waiving the insurer’s right of subrogation against City.

10. SECURITY

10.1 Contractor shall not commence the Work under this Contract until Contractor has obtained all security required under this Section and such security has been approved by City as to form, amount and carrier.

10.2 Contractor shall maintain in full force and effect during the term of this Contract a certificate regarding workers' compensation, liability insurance certificates, proof of a valid business license and any other documents required by the Contract. If this Contract is for more than $25,000.00, Contractor shall also maintain in full force and effect during the term of this Contract security guaranteeing one hundred percent (100%) of payment (labor and materials) and separate security guaranteeing one hundred percent (100%) of performance. If bonds are the chosen form of security, they shall be submitted on the forms which are part of the Contract Documents; no substitutions shall be accepted. The performance bond shall remain in effect for all deliverables for one full year from the date of acceptance of the Work to insure that defects which appear within said period will be repaired, replaced, or corrected by the Contractor at his own cost and expense to the satisfaction of the City Engineer within thirty (30) days after written notice thereof by City.

Small Public Works Contract
12 10.3 The surety shall be admitted to do business in California, listed with the State of California Department of Insurance and shall comply with all requirements of State law. (No surplus list surety will be accepted.) (Code of Civil Procedure § 995.311.)

10.4 If during this Contract any of the sureties upon the bonds become insufficient in the opinion of City, City may require additional sureties which Contractor shall furnish to City’s satisfaction within 15 calendar days after written notice and failure to do so shall be considered a default by Contractor.

11. CITY'S RIGHT TO TERMINATE

11.1 If Contractor refuses or fails to prosecute the Work with such diligence as will insure its completion within the time specified or any extension thereof, or fails to complete the Work within such time, or if Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of his insolvency, or if Contractor or any subcontractor shall violate any of the provisions of this Contract, or should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough properly skilled workers or proper materials to complete the Work in the time specified, or if he should fail to make prompt payment to subcontractors or for material or labor, or persistently disregard laws, or instructions of City or otherwise breach this Contract, City shall serve written notice on Contractor and Contractor's sureties of the intention that this Contract be terminated together with the reasons therefor. Unless within five (5) working days after the service of such notice such condition or violation shall cease or satisfactory arrangements for the correction thereof be made, this Contract shall upon the expiration of said five (5) working days, cease and terminate. In such case, Contractor shall not be entitled to receive any further payment until the Work is finished.

In event of any such termination, City shall immediately serve written notice thereof upon surety and Contractor, and surety shall have the right to take over and perform this Contract, provided, however, that if surety within five (5) working days after service upon it of said notice of termination does not give City written notice of its intention to take over and perform this Contract or does not commence performance thereof within ten (10) working days from the date of serving such notice, City may take over the Project and prosecute the same to completion by contract or by any other method it may deem advisable for the account and at the expense of Contractor, and Contractor and its surety shall be jointly and severally liable to City for any excess cost or other damages occasioned City thereby. If City takes over the Project as herein above provided, City may, without liability for so doing, take possession of, and utilize in completing the Project, such materials, appliances, plant, and other property belonging to Contractor as may be on the site of the Project and necessary therefor.

In the event of any such termination, Contractor will be paid for Work performed, less damages caused to City by the acts of Contractor causing the termination.

Small Public Works Contract
13 11.2 City may terminate the Contract at its own discretion for any reason. Upon such termination, City will pay Contractor fair and reasonable compensation as agreed upon between City and Contractor. In the event that no agreement is reached, City will be liable to Contractor only for the reasonable value of the Work performed and other actual costs sustained by Contractor.

12. WAIVER
No waiver of any provision of this Contract shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

13. NOTICE

13.1 Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving notice or by a duly authorized representative of such party. Any notice shall not be effective for any purpose whatever unless served in the following manner:

13.2 Whenever it shall be necessary for either party to serve notice on the other respecting the Contract, such notice shall be in writing and served by personal delivery or by registered mail, postage prepaid, return receipt requested, addressed as follows:

City: City of Gardena
Kevin Kwak, P.E.
1717 W. 162 nd Street
Gardena, CA 90247

Contractor: XXXXXXXXXX

unless and until different addresses may be furnished in writing by either party to the other.

14. ASSIGNMENT

14.1 Contractor shall not assign the performance of the Contract, nor any part thereof, nor any monies due or to become due hereunder, without the prior written consent of City.

14.2 Subject to the provision of this Section regarding assignment, the Contract shall be binding upon the heirs, executors, administrators, successors, and assigns of Contractor.

15. ATTORNEY'S FEES

Small Public Works Contract
14 Except as specifically provided for herein, attorney’s fees shall not be awarded to either party in any action in law or in equity, including an action for declaratory relief, brought to enforce or interpret the provisions of this Contract or to assert any claim resulting or alleged to result from its performance.

16. MISCELLANEOUS PROVISIONS

16.1 The Contract shall be effective from and after the date that this Contract is signed by the representatives of City.

16.2 This Contract may be made in counterparts.

16.3 The captions of the articles, sections, subsections, paragraphs and subparagraphs of the Contract are for reference only and are not to be construed in any way as a part of the Contract.

16.4 The rights and remedies contained in this Contract are cumulative, and in addition to and not in limitation of, any right or remedy at law or in equity to which City may be entitled.

16.5 Pursuant to Gardena Municipal Code Section 2.24.020(H), Contractor is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the city of Gardena until completion of Work.

17. ENTIRE AGREEMENT

17.1 This Contract integrates all terms and conditions in connection with the Work and supersedes all negotiations and prior understandings, either oral or in writing, in respect to the subject matter hereof.

17.2 The Contract shall not be amended except by a writing duly executed by the parties.

18. PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Contract and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Contract. No provision of this Contract or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

19. Claims Disputes

Any claims of Contractor, as “claims” are defined in California Public Contract Code Section 9204 shall be processed in accordance with that section. Section 9204 provides in relevant part that upon receiving a claim from a contractor, together with reasonable documentation to support the claim, a contracting public entity shall conduct a reasonable review of the claim and, within a period not to exceed 45 days [except as otherwise provided in Section 9204], shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim shall

Small Public Works Contract
15 be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. If the contractor disputes the public entity’s written response, or if the public entity fails to respond to a claim within the time prescribed, the contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the contractor sharing the associated costs equally. The public entity and contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to other applicable procedures.

IN WITNESS WHEREOF, THE PARTIES hereto have caused this Contract to be executed and attested by their duly authorized officers.

CITY CONTRACTOR

By: By:

CITY MANAGER (Sign) Sign / Title

Date: Date: SEAL

Attest: Attest : (Contractor)
By:

CITY CLERK (Sign) By: Sign / Title
Date: Date:

APPROVED AS TO FORM:

By:

CITY ATTORNEY (Sign)

Date:

Small Public Works Contract
16 (To be submitted after award)

CONTRACT

PROJECT NO. JN 511

FAITHFUL PERFORMANCE BOND

WHEREAS, the City of Gardena has awarded to hereinafter designated as the "Principal", a Contract for:

PROJECT:

WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract;

NOW, THEREFORE, we, as Principal, and
___________________________________________________________as Surety, are held and firmly bound unto the City, as Obligee, in the sum ($___________ ), lawful money of the United States of America, this amount being not less than one hundred percent (100%) of the total Contract price, , for payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In case suit is brought upon this bond, the Surety will pay all court costs and reasonable attorneys’ fees to the City of Gardena in an amount to be fixed by the court.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, well and truly keep and perform all the undertakings, terms, covenants, conditions and agreements in the said Contract and any alteration thereof, made as therein provided, all within the time and in the manner therein designated and in all respects according to their true intent and meaning, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

FURTHER, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849. The City is the principal beneficiary of this bond and has all rights of a party hereto.

Small Public Works Contract
17 This bond shall remain in full force and effect for a warranty period of one full year after acceptance of the job by the City.

IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and Surety named herein, on the day of , 2019, the
name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

[PRINCIPAL]

By
Title

Signature

[SURETY]

By
Title

Address

Phone No.

Signature

All signatures must be notarized.

Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.

Corporations must affix corporate seal.

Small Public Works Contract
18 (To be submitted after award)

CONTRACT

PROJECT NO. JN 511

PAYMENT BOND

WHEREAS, the City of Gardena has awarded to , as Contractor, a contract for the work described as follows:

PROJECT:

AND WHEREAS, said Contractor is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons, as provided by law;

NOW, THEREFORE, we, the undersigned Contractor and Surety, are held firmly bound unto the City in the sum of , Dollars ($ _________ ) this
amount being not less than one hundred percent (100%) of the total Contract price, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if said Contractor, its heirs, executors, administrators, successors, assigns, or subcontractors shall fail to pay any of the persons named in Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, or any other amounts due to persons under any applicable project contract or law, with respect to such work and labor, then the Surety or Sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, the said Surety will pay all court costs and reasonable attorneys’ fees to the plaintiff(s) and City in an amount to be fixed by the court.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 3181 as to give a right of action to such persons or their assigns in any suit brought upon this bond.

Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849.

Small Public Works Contract
19 This bond shall remain in full force and effect for six full months after the period in which verified claims may be filed as provided for in Section 3184 of the California Civil Code.

IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and Surety named herein, on the day of , 2014, the
name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

[PRINCIPAL]

By
Title

Signature

[SURETY]

By
Title

Address

Phone No.

Signature

All signatures must be notarized.

Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.

Corporations must affix corporate seal.
(To be submitted with bid/quote)

Small Public Works Contract
20 (To be submitted after award)

CONTRACT

PROJECT NO. JN 511

WORKER'S COMPENSATION INSURANCE CERTIFICATE

The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of the Contract.

DATED:

CONTRACTOR

By
Signature

Title

ATTEST:

By
Signature

Title

(To be submitted with bid/quote)

Small Public Works Contract
21 (To be submitted after award)

PROPOSAL

PROJECT NO. JN 511

DESIGNATION OF SUBCONTRACTORS

In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Public Contract Code of the State of California, and any amendments thereto, each bidder shall set forth below the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

If the contractor fails to specify a subcontractor for any portion of the work to be performed under the contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the City.

The bidder shall also designate in the space provided indicating whether or not the subcontractor qualifies as a Woman Owned Business Enterprise, "WBE”, or a Minority Business Enterprise, "MBE”.

WBE Portion State
or of Subcontractor's Type of License
MBE Work % Name and Address Work Number Class
____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______ ____ _____ ___________________________ _______ ______ ______

Not more than _____%.

Small Public Works Contract
22 (To be submitted with bid/quote)

PROPOSAL

PROJECT NO. JN 511

NON-COLLUSION AFFIDAVIT
(To be executed by Bidder and submitted with Bid)

State of California

County of Los Angeles

being first duly sworn, deposes and
says that he or she is of
the party making the foregoing bid, that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, or agent thereof to effectuate a collusive or sham bid.

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP

ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)
POLICE STATION SEWER PUMP IMPROVEMENT PROJECT, 511

City of Gardena
Gardena City Council Meeting

AGENDA REPORT SUMMARY
Agenda Item No. 15.D
Section: DEPARTMENTAL

ITEMS - PUBLIC WORKS
Meeting Date: February 8, 2022

TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE:

Gardena Public Geographic Information System (GIS) Viewer COUNCIL ACTION REQUIRED:

Staff Recommendation: Receive and File
RECOMMENDATION AND STAFF SUMMARY:

In June 2021, the Public Works Department began working to develop a Geographic Information System for the City of Gardena. A Geographic Information System, or GIS, is a computer-based mapping and information system. GIS enables a City to link information about places, events and facilities to their correct location on a map, thereby providing a easy access to the graphical and tabular information.

Smaller cities like Gardena are best served utilizing an outside vendor to host the GIS data and to provide a browser for staff and the public to access the data. Staff requested proposals from various GIS vendors and found Nobel Systems to be the best qualified, and at a very reasonable cost of $20,000 a year. Public Works Director Allan Rigg had previously worked with Nobel and had found them to be excellent in providing similar services.

Over the past six months, Nobel has worked to accumulate and host data the city has generated in the Community Development Department, including Land Use, Zoning and General Plan data. Nobel has also added links to data provided by outside agencies such as the Assessor's Office, the Los Angeles County Department of Public Works, FEMA, and the Census Bureau. It is planned that additional data will be added to the system, including development projects, city sewers, traffic counts, and trash pickup day of the week. Even more data can be developed by the city or an outside vendor, and Nobel will add it to the system.

Nobel System has provided for the use by city staff of one version of a browser for this data that has robust capabilities for analysis of the data. A simplified version of this browser for the public is now ready to make available to the public without the analysis tools. The Gardena Public GIS viewer is a simple website that needs no username or password. Our plan is to link it to our website for the public to use.

FINANCIAL IMPACT/COST:

Budget Amount: $20,000
Founding Source: $2,000 Measure W, $6,000 Measure M, and $12,000 Sewer Funds ATTACHMENTS:

APPROVED:
___________________________________
Clint Osorio, City Manager