Construction and Inspection Guide
Construction Inspections
Once a building permit has been issued , inspections for the work are required. This process helps assure that the work is being done according to building code safety and seismic standards. You or your contractor must request an inspection when the work has progressed to any of the required inspection points indicated on your permit. Do not cover anything before it is inspected.

To request INSPECTION BY PHONE, please call the Building & Safety Department at (310) 217-9510. Any request for an inspection must be made at least 24 hours in advance. Inspections are available in the morning or in the afternoon. A morning inspection will occur between the hours of 9:00 a.m. and 12:00 p.m . An afternoon inspection will occur between the hours of 1:00 p.m. and 4:00 p.m. When calling to request an inspection, please provide the following information:

1. Name and telephone number where you can be reached between 8 a.m. and 5 p.m.

2. Address of the job

3. Permit number

4. Type of inspection needed

5. Date and time preferred
Construction Debris and Other Building Materials Removal Waste Resource of Gardena (WRG) is the only authorized hauler for construction/demolition/grading projects in the City of Gardena. Using any other hauler for any construction related project listed above will result in legal action and fines. WRG's customer service number is (310) 366-7600.

Construction Hours
All construction related activity is restricted to the hours of 7:00 a.m to 6 :00 p.m., Monday through Friday, and 9:00 a.m. to 6:00 p.m. on Saturday. No construction act ivity is permitted on Sundays or any of the following legally observed holidays: Memorial Day, Fourth of July, Labor Day, Thanksgiving, Christmas Day and New Year's Day.

Construction Site Signage
Prior to the beginning of grading, demolition, or construction activity, at least one 12"X18" weatherproof sign must be posted on each street frontage of the project site a t a location acceptable to the Building Inspector that displays the working hours and the name and emergency phone number of the contractor.

Construction Site Security
All construction sites are required to be secured from unauthorized access with an eight foot (8') chain link fence covered with a windscreen.

Best Practices for Construction Activities:

1. All persons working at the site should obtain, read , and understand the Best Management Practices pamphlet for the type(s) of construction being done.

2. Stockpiles of soil, demolition debris, cement, sand, top soil, etc. must be covered with waterproof material or bermed to prevent being washed off site.

Page 2 ends

3. Fuels, oils, paints, solvents, and other liquid materials must be kept inside bermed areas. Spills must not be washed to the street.

4. Waste concrete cannot be washed into street, storm drain catch basins, or public right -of-way. All dust and slurry from concrete cutting must be removed using a wet -dry vacuum or equivalent.

5. Trash and other construction solid wastes must be placed in a covere d trash receptacle.

6. Eroded soil from disturbed slopes must be contained using berms, silt fences, setting basins, or good erosion management practices such as reseeding.

7. Wash water from cleaning construction vehicles and equipment must be kept on -site within a containment area.

Construction and
Demolition
Diversion Program
City of Gardena
Community Development Department
1700 W. 162nd Street
Gardena, CA 90247
1 In 2003, the City of Gardena (City) adopted a diversion program for construction and demo- lition wastes. The purpose of the program is to provide an incentive to encourage the diver- sion (recycling or reuse) of specific materials that represent a large percentage of the City’s overall municipal waste stream. Any contractor or builder that applies for a building permit is required to remit a diversion deposit in an amount set by resolution of the City Council (exceptions do exist, and are described below). The deposit is fully refundable if at least 65% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. This booklet will guide you through this process, and explain the amount of the deposit, the mechanism for refund, and the docu- mentation required. There are four easy steps to follow to assure compliance with the pro- gram, and to ultimately save you money through reduced waste disposal cost.

Step DETERMINE APPLICABILITY & COMPLETE FORM CD-1
Determine Applicability — Unless specifically exempted, each person (applicant) who ap- plies for a building or demolition permit must fulfill the requirements of the construction and demolition program described in this package.

See next page for CALGreen Construction Waste Reduction Requirements and Applications.

Form CD -1—Unless exempt, an applicant is required to prepare a Waste Management and Recycling Plan by completing Form CD -1 (Form CD -1 is included in this booklet). On this form, the applicant will estimate the amount of waste they expect to generate through their construction and/or demolition project. Waste materials include, but are not limited to, soil, wood, wallboard, concrete, and mixed trash. As part of the waste management and recycling plan, the applicant should decide how they intend to assure that at least 65% of the waste that the project will generate, will be diverted from landfill. Wood, concrete, asphalt, metal, glass, drywall, ceramic, brick, and many other materials are all readily recyclable (or reusable if segregated properly). Please note that submittal and approval of an accurate and complete waste management and recycling plan is a precondition to issuance of any building permit.

Submit your completed Form CD -1 to the City with your completed building permit applica- tion.

Occupancy
2016 CALGreen State Code Requirements and Applications
Effective 1/1/2017
Non–Residential Compli-
ance Methods (5.408)
≥ 65% C&D Waste Diversion of non-hazardous materials are required to sub- mit a construction waste management plan (5.408.1.1) and utilize a City ap- proved waste management company (5.408.1.2)
New Construction All newly constructed buildings.

Demolition 100% of all concrete and dirt . — 65% of all non-hazardous materials.

Addition (301.3) All structures 1000 sq ft or more.

Alterations (301.3) All structures $200,000 or more.

Tier 1 (Voluntary)
(A5.408.3.1) ≥ 80% Construction Waste Diversion
Tier 2 (Voluntary )
(A5.408.3.1.1) ≥ 95% Construction Waste Diversion

Residential Compliance
Methods (4.408)
≥ 65% C&D Waste Diversion and may be required to submit a construction waste management plan (4.408.2) and utilize a City approved waste manage- ment company (4.408.3)
Low-Rise-3 stories or less
(4.408.4) ≥ 65% C&D Waste Diversion
High-Rise-4 stories or more
(4.408.4.1) All permitted structures.

New Construction All permitted structures
Demolition 100% of all concrete and dirt. - 65% of all non-hazardous materials.

Additions (301.1) All permitted structures.

Alterations (301.1) All permitted structures.

Tier 1 (Voluntary)
(A4.408.1) ≥ 80% C&D Waste Diversion
Tier 2 (Voluntary) ≥ 95% C&D Waste Diversion

The following table contains the 2016 CALGreen Construction Waste Reduction Requirements:
2 Step

PAY YOUR DIVERSION DEPOSIT &

YOUR ADMINISTRATIVE FEE
Diversion Deposit — Unless specifically exempted by one of the project types listed un- der step 1, each person (applicant) who applies for a building and/or demolition permit shall post a cash deposit in an amount as specified in the table above, but will not exceed $15,000.

The diversion deposit will be refunded in full upon proof that at least 65% of the project waste was recycled and/or diverted . Waste Resource Management (WRG) is the only au- thorized hauler for the City of Gardena. You can contact them at 310 -366-7600. Failure to use WRG will result in denial of deposit refund.

Administrative Fee — In addition to the diversion deposit, an administrative fee must al- so be paid to the City. The fee will compensate the City for all expenses incurred in admin- istering the construction and demolition program, including site inspections, document re- view, and processing. The administrative fee is non -refundable and is calculated based on one percent (1%) of the dollar value of a project, but not to exceed $5,000. If your project is exempt, there is no administrative fee.

Deposit and administrative fee payments can be made in the form of cash, check, cashier’s check, money order, or credit card (VISA, Mastercard, or Discover Card). Payments should be made to the City of Gardena.

Make your payments when you submit your completed Form CD-1 and building permit ap- plication. If desired, a single payment can be issued to the City for both the diversion de- posit and the administrative fee.

Project Value Deposit Amount
> $50,000—$99,999 $5,000
$100,000—$249,999 $7,500
$250,000—$499,999 $10,000
$500,000 + $15,000
3 Step

DIVERT C&D WASTES

THROUGH RECYCLING OR REUSE
It is the responsibility of every owner, general contractor, subcontractor, and developer to divert the maximum amount of salvageable and reusable materials away from landfilling.

Materials diverted prior to demolition and during and after construction are equally eligible for diversion “credit.” “Divert” or “diversion” means a reduction in the amount of waste being disposed in landfills by any of the following methods: use of new construction methods that reduce the amount of waste generated, onsite reuse of waste, job site separation and deliv- ery to a recycling facility, delivery of mixed but clean materials to an approved materials re- covery facility, and other methods as approved in advance by the City. All waste diversion methods that qualify for a refund of the diversion deposit are subject to restrictions and documentation requirements set forth in the City’s Municipal Code.

Be sure to keep all weight receipts issued by any recycling facility and maintain records or logs of the volume and weight of materials reused on the job site.

To help you make decision about waste management and recycling, the City has prepared a separate booklet entitled “Recycling Practices for Construction and Demolition Projects” de- scribing methods of diversion, local outlets for materials, and hints about best management practices for recycling and reuse.

The City will monitor and evaluate each construction and demolition project to gauge the project and progress toward the diversion requirements.

4 Step

APPLY FOR DEPOSIT REFUND
At the completion, and prior to, the final inspection and issuance of any certificate of occu- pancy of the demolition and/or construction project, the applicant shall submit documents to the Building and Safety Department, which proves compliance with the diversion re- quirements of this program. The documentation shall consist of:

1. A completed Form CD -2, “Recycling and Reuse Summary Report,” summarizing the weight data of materials diverted and disposed (Form CD -2 is included in this booklet).

2. Originals or photocopies of receipts, weight tickets, or other records of measure- ment from recycling facilities, salvage companies, deconstruction contractors, waste haulers, processors, transfer stations, and landfills.

A properly completed “Recycling and Reuse Summary Report”, and all receipts, must be submitted to the City at least five day prior to a request for final inspection and issuance of a certificate of occupancy.

Deposits will not be refunded to applicants who do not meet the timely reporting require- ments of the Municipal Code. Also, failure to conform to the diversion requirements could affect approval of future permits. A deposit refund will be issued for any project where a building permit was withdrawn or cancelled before any work was begun.

What is a “green” building, and why should I care?

A green building is a sustainable building; that is, a structure designed, built, operated and reused in a resource efficient manner. Of the total expenditures owner may make over the course of the building’s service lifetime, the design and construction cost (the so-called first costs) will account for 5 to 10% of the total life cycle cost. In contrast, operations and maintenance cost will account for 60 to 80% of the total life cycle cost.

Some easy tips: 1) minimize wastewater by using ultra low-flush toilets, and incorporate hot water re-circulating systems, and self-closing nozzles on hoses; 2) reuse and recycle C&D waste onsite such as inert wastes for base material for a parking lot; 3) protect and retain ex- isting landscaping; and 4) take advantage of natural features including the use of plants that have low water and pesticide needs, and generate minimum plant trimmings.

Revised January 1, 2017

Stantec Project Number:

The professional's seal on the cover sheet represents that the information on the cover sheet is accurate in designer's professional opinion but does not assume professional responsibility for documents sealed by others that are referenced on the cover sheet.

All professionals sealing drawings as a part of the design are professionally responsible for their own sealed documents. 13999 S. Western Ave. Gardena, CA 90249

ISSUE FOR BID
Gardena Transit Administration and
Operations Building - Dispatch Suite Remodel
2014226901

VICINITY MAP

DESIGN TEAM
STANTEC:
• ARCHITECT:

PATRICK MARTIN McKELVEY
(213) 955-9775
[email protected]
801 S. FIGUEROA, SUITE 300, LOS ANGELES CA 90017
• STRUCTURAL ENGINEER:

YU-NING CHEN
(415) 281-5428
[email protected]
100 CALIFORNIA STREET SUITE 1000, SAN FRANCISCO CA 94111 • MECHANICAL ENGINEER:

SEVAK GALSTYAN
(213) 269-4191
[email protected]
801 S. FIGUEROA, SUITE 300, LOS ANGELES CA 90017
• ELECTRICAL ENGINEER:

PAUL K. ERICSON
(858) 622-2743
[email protected]
9797 AERO DRIVE, SUITE 310, SAN DIEGO CA 92123
• ICT ENGINEER:

JOHN HYSLER
(858) 622-2731
[email protected]
9797 AERO DRIVE, SUITE 310, SAN DIEGO CA 92123

SHEET INDEX
SHEET

NUMBER SHEET NAME

ELECTRICAL
E-001 SYMBOLS AND ABBREVIATIONS, ELECTRICAL SHEET IN DEX E-002 TITLE 24 COMPLIANCE FORMS
E-003 TITLE 24 COMPLIANCE FORMS
E-101 POWER GROUND FLOOR PLAN
E-201 LIGHTING GROUND FLOOR PLAN
E-501 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-601 SINGLE LINE DIAGRAM - NORMAL
E-602 SINGLE LINE DIAGRAM - EMERGENCY
E-701 PANEL SCHEDULES
E-702 PANEL SCHEDULES
ED-101 DEMOLITION POWER GROUND FLOOR PLAN
ED-201 DEMOLITION LIGHTING GROUND FLOOR PLAN

TELECOM
T-000 SYMBOL AND ABBREVIATIONS
T-001 TELECOM SPECIFICATION
T-002 TELECOM SPECIFICATION
T-003 TELECOM SPECIFICATION
T-004 TELECOM CABLING ROUGH-IN SCHEDULES
T-101 TELECOM GROUND FLOOR PLAN
T-401 TELECOM ENLARGED PLAN
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-601 TELECOM SINGLE LINE DIAGRAM
TD-101 TELECOM DEMOLITION PLAN

SHEET INDEX
SHEET

NUMBER SHEET NAME

GENERAL
G-000 COVER
G-001 CODE - LIFE SAFETY EGRESS
G-002 GREEN BUILDING CHECKLIST
G-101 TYPICAL MOUNTING HEIGHTS & ACCESSIBILITY DETAI LS

DEMOLITION
AD-01 DEMOLITION PLANS

STRUCTURAL
S-001 GENERAL NOTES
S-201 PARTIAL (E) ROOF FRAMING PLAN
S-701 EQUIPMENT ANCHORAGE

ARCHITECTURE
A-001 ABBREVIATIONS & ARCHITECTURAL GENERAL NOTES
A-100 SITE PLAN (AREA OF WORK)
A-101 FLOOR PLAN - RCP - ROOF PLAN
A-201 ENLARGED PLANS & ELEVATIONS
A-501 INTERIOR DETAILS
A-600 METAL STUD FRAMING DETAILS
A-601 PARTITION TYPES & CEILING DETAILS
A-602 CEILING DETAILS
A-611 DOOR & WINDOW SCHEDULE
A-621 DOOR & WINDOW DETAILS
A-701 FINISH PLAN & FINISH SCHEDULE
A-901 FURNITURE PLAN - FOR REFERENCE ONLY

MECHANICAL
M-001 GENERAL NOTES, SYMBOLS AND LEGENDS
M-002 GENERAL NOTES, SYMBOLS AND LEGENDS
M-003 MECHANICAL SPECIFICATIONS
M-004 MECHANICAL SPECIFICATIONS
M-005 MECHANICAL SPECIFICATIONS
M-006 MECHANICAL TITLE 24
M-200 MECHANICAL ZONING PLAN
M-201 MECHANICAL FLOOR PLANS - NEW CONSTRUCTION
M-202 MECHANICAL HOT WATER PIPING PLAN
M-601 MECHANICAL DETAILS
M-602 MECHANICAL DETAILS
M-701 MECHANICAL CONTROL DIAGRAM
M-702 MECHANICAL CONTROL DIAGRAM
MD201 MECHANICAL FLOOR PLANS - DEMOLITION

DEFERRED SUBMITTALS

1. FIRE ALARM SYSTEM MODIFICATIONS

2. FIRE SPRINKLER SYSTEM MODIFICATIONS

3. MECHANICAL EQUIPMENT SEISMIC CONTROLS, FRAMING AND SUPPORTS

PROJECT DESCRIPTION

THIS PROJECT IS REMODELING OF THE DISPATCH SUITE AND SUPERVISORS OFFICE, INCLUDING THE ADDITION OF A KITCHENETTE, AND A SMALL ‘INTERVIEW ’ CONFERENCE ROOM. PROPOSED WORK ALSO INCLUDES REPLACEMENT OF THE

EXISTING HVAC UNIT THAT SERVES THE DISPATCH SUITE AREA, AND MODI FICATIONS

TO THE ELECTRICAL RECEPTACLES/LIGHTING ASSOCIATED WITH NEW DISPA TCH SUITE DESIGN AND POWER FOR AFOREMENTIONED HVAC UNIT.
1 1
1 1

SHEET INDEX
SHEET

NUMBER SHEET NAME

ELECTRICAL
E-001 SYMBOLS AND ABBREVIATIONS, ELECTRICAL SHEET IN DEX E-002 TITLE 24 COMPLIANCE FORMS
E-003 TITLE 24 COMPLIANCE FORMS
E-101 POWER GROUND FLOOR PLAN
E-201 LIGHTING GROUND FLOOR PLAN
E-501 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-601 SINGLE LINE DIAGRAM - NORMAL
E-602 SINGLE LINE DIAGRAM - EMERGENCY
E-701 PANEL SCHEDULES
E-702 PANEL SCHEDULES
ED-101 DEMOLITION POWER GROUND FLOOR PLAN
ED-201 DEMOLITION LIGHTING GROUND FLOOR PLAN

TELECOM
T-000 SYMBOL AND ABBREVIATIONS
T-001 TELECOM SPECIFICATION
T-002 TELECOM SPECIFICATION
T-003 TELECOM SPECIFICATION
T-004 TELECOM CABLING ROUGH-IN SCHEDULES
T-101 TELECOM GROUND FLOOR PLAN
T-401 TELECOM ENLARGED PLAN
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-601 TELECOM SINGLE LINE DIAGRAM
TD-101 TELECOM DEMOLITION PLAN

SHEET INDEX
SHEET

NUMBER SHEET NAME

GENERAL
G-000 COVER
G-001 CODE - LIFE SAFETY EGRESS
G-002 GREEN BUILDING CHECKLIST
G-101 TYPICAL MOUNTING HEIGHTS & ACCESSIBILITY DETAI LS

DEMOLITION
AD-01 DEMOLITION PLANS

STRUCTURAL
S-001 GENERAL NOTES
S-201 PARTIAL (E) ROOF FRAMING PLAN
S-701 EQUIPMENT ANCHORAGE

ARCHITECTURE
A-001 ABBREVIATIONS & ARCHITECTURAL GENERAL NOTES
A-100 SITE PLAN (AREA OF WORK)
A-101 FLOOR PLAN - RCP - ROOF PLAN
A-201 ENLARGED PLANS & ELEVATIONS
A-501 INTERIOR DETAILS
A-600 METAL STUD FRAMING DETAILS
A-601 PARTITION TYPES & CEILING DETAILS
A-602 CEILING DETAILS
A-611 DOOR & WINDOW SCHEDULE
A-621 DOOR & WINDOW DETAILS
A-701 FINISH PLAN & FINISH SCHEDULE
A-901 FURNITURE PLAN - FOR REFERENCE ONLY

MECHANICAL
M-001 GENERAL NOTES, SYMBOLS AND LEGENDS
M-002 GENERAL NOTES, SYMBOLS AND LEGENDS
M-003 MECHANICAL SPECIFICATIONS
M-004 MECHANICAL SPECIFICATIONS
M-005 MECHANICAL SPECIFICATIONS
M-006 MECHANICAL TITLE 24
M-200 MECHANICAL ZONING PLAN
M-201 MECHANICAL FLOOR PLANS - NEW CONSTRUCTION
M-202 MECHANICAL HOT WATER PIPING PLAN
M-601 MECHANICAL DETAILS
M-602 MECHANICAL DETAILS
M-701 MECHANICAL CONTROL DIAGRAM
M-702 MECHANICAL CONTROL DIAGRAM
MD201 MECHANICAL FLOOR PLANS - DEMOLITION

SHEET INDEX
SHEET

NUMBER SHEET NAME

ELECTRICAL
E-001 SYMBOLS AND ABBREVIATIONS, ELECTRICAL SHEET IN DEX E-002 TITLE 24 COMPLIANCE FORMS
E-003 TITLE 24 COMPLIANCE FORMS
E-101 POWER GROUND FLOOR PLAN
E-201 LIGHTING GROUND FLOOR PLAN
E-501 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-601 SINGLE LINE DIAGRAM - NORMAL
E-602 SINGLE LINE DIAGRAM - EMERGENCY
E-701 PANEL SCHEDULES
E-702 PANEL SCHEDULES
ED-101 DEMOLITION POWER GROUND FLOOR PLAN
ED-201 DEMOLITION LIGHTING GROUND FLOOR PLAN

TELECOM
T-000 SYMBOL AND ABBREVIATIONS
T-001 TELECOM SPECIFICATION
T-002 TELECOM SPECIFICATION
T-003 TELECOM SPECIFICATION
T-004 TELECOM CABLING ROUGH-IN SCHEDULES
T-101 TELECOM GROUND FLOOR PLAN
T-401 TELECOM ENLARGED PLAN
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-601 TELECOM SINGLE LINE DIAGRAM
TD-101 TELECOM DEMOLITION PLAN

SHEET INDEX
SHEET

NUMBER SHEET NAME

GENERAL
G-000 COVER
G-001 CODE - LIFE SAFETY EGRESS
G-002 GREEN BUILDING CHECKLIST
G-101 TYPICAL MOUNTING HEIGHTS & ACCESSIBILITY DETAI LS

DEMOLITION
AD-01 DEMOLITION PLANS

STRUCTURAL
S-001 GENERAL NOTES
S-201 PARTIAL (E) ROOF FRAMING PLAN
S-701 EQUIPMENT ANCHORAGE

ARCHITECTURE
A-001 ABBREVIATIONS & ARCHITECTURAL GENERAL NOTES
A-100 SITE PLAN (AREA OF WORK)
A-101 FLOOR PLAN - RCP - ROOF PLAN
A-201 ENLARGED PLANS & ELEVATIONS
A-501 INTERIOR DETAILS
A-600 METAL STUD FRAMING DETAILS
A-601 PARTITION TYPES & CEILING DETAILS
A-602 CEILING DETAILS
A-611 DOOR & WINDOW SCHEDULE
A-621 DOOR & WINDOW DETAILS
A-701 FINISH PLAN & FINISH SCHEDULE
A-901 FURNITURE PLAN - FOR REFERENCE ONLY

MECHANICAL
M-001 GENERAL NOTES, SYMBOLS AND LEGENDS
M-002 GENERAL NOTES, SYMBOLS AND LEGENDS
M-003 MECHANICAL SPECIFICATIONS
M-004 MECHANICAL SPECIFICATIONS
M-005 MECHANICAL SPECIFICATIONS
M-006 MECHANICAL TITLE 24
M-200 MECHANICAL ZONING PLAN
M-201 MECHANICAL FLOOR PLANS - NEW CONSTRUCTION
M-202 MECHANICAL HOT WATER PIPING PLAN
M-601 MECHANICAL DETAILS
M-602 MECHANICAL DETAILS
M-701 MECHANICAL CONTROL DIAGRAM
M-702 MECHANICAL CONTROL DIAGRAM
MD201 MECHANICAL FLOOR PLANS - DEMOLITION
ED-101 DEMOLITION POWER GROUND FLOOR PLAN
ED-201 DEMOLITION LIGHTING GROUND FLOOR PLAN

ED-101 DEMOLITION POWER GROUND FLOOR PLAN
ED-201 DEMOLITION LIGHTING GROUND FLOOR PLAN

E-101 POWER GROUND FLOOR PLAN
E-201 LIGHTING GROUND FLOOR PLAN
E-501 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-601 SINGLE LINE DIAGRAM - NORMAL
E-602 SINGLE LINE DIAGRAM - EMERGENCY
E-701 PANEL SCHEDULES
E-702 PANEL SCHEDULES

TD-101 TELECOM DEMOLITION PLAN

T-101 TELECOM GROUND FLOOR PLAN
T-401 TELECOM ENLARGED PLAN
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-601 TELECOM SINGLE LINE DIAGRAM

MD201 MECHANICAL FLOOR PLANS - DEMOLITION
M-200 MECHANICAL ZONING PLAN
M-201 MECHANICAL FLOOR PLANS - NEW CONSTRUCTION
M-202 MECHANICAL HOT WATER PIPING PLAN
M-601 MECHANICAL DETAILS
M-602 MECHANICAL DETAILS
M-701 MECHANICAL CONTROL DIAGRAM
M-702 MECHANICAL CONTROL DIAGRAM
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D

SUPERVISORS
420 SF
150 OLF
3 OCC

INTERVIEW
90 SF
15 OLF
6 OCC

PARA TRANSIT
83 SF
150 OLF
1 OCC

STANDBY
195 SF
15 OLF
13 OCC

DISPATCH
290 SF
150 OLF
2 OCC

VESTIBULE
130 SF
150 OLF
1 OCC
7 7
12 1
6 3
E
106
120
10 AREA OF WORK
3B
3A
2 4A
4B
7 5B
20 1' - 5"
1' - 7"
1 1' - 4"
A3 - ASSEMBLY - UNCONCENTRATED (TABLES & CHAIRS), OLF=15 B - BUSINESS AREAS, OLF=150
SITE ADDRESS:

GARDENA TRANSIT (GTRANS)

CODES IN EFFECT
CALIFORNIA BUILDING CODE, 2019 EDITION
CALIFORNIA PLUMBING CODE, 2019EDITION
CALIFORNIA MECHANICAL CODE, 2019 EDITION
CALIFORNIA ELECTRICAL CODE, 2016 EDITION
CALIFORNIA ENERGY CONSERVATION CODE, 2019 EDITION
CALIFORNIA FIRE CODE, 2019 EDITION
CALIFORNIA GREEN BUILDING STANDARDS CODE, 2019 EDITION
ICC/ANSI A117.1 -2003 AMERICAN NATIONAL STANDARD
OWNER:
13999 S. WESTERN AVE. GARDENA, CA 90249
AUTHORITY HAVING JURISDICTION:

CITY OF GARDENA, BUILDING & SAFETY DEPARTMENT

GENERAL CODE INFORMATION

BUILDING TYPE

OFFICE BUILDING

BUILDING OCCUPANCY

OFFICE, OCCUPANCY GROUP B
CONFERENCE ROOMS. OCCUPANCY GROUP A -3

CONSTRUCTION TYPE

TYPE V -B CONSTRUCTION (NONRATED)

FIRE PROTECTION

AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT

FIRE RESISTIVE REQUIREMENTS BASED ON CONSTRUCTION TYPE

1. EXTERIOR BEARING WALLS: NO REQUIREMENT

2. INTERIOR BEARING WALLS: NO REQUIREMENT

3. EXTERIOR NON -BEARING WALLS: NO REQUIREMENT

4. STRUCTURAL FRAME: NO REQUIREMENT

5. PERMANENT PARTITIONS: NO REQUIREMENT

6. SHAFT ENCLOSURES: ONE HOUR AS OCCURS

7. FLOORS AND FLOOR -CEILING: NO REQUIREMENT

8. ROOFS AND ROOF -CEILINGS: NO REQUIREMENT

EXITING REQUIREMENTS
MAX TRAVEL DISTANCE: 250 FEET
CORRIDOR: CBC 1005.1 NONRATED, 44" MIN
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

CODE - LIFE SAFETY EGRESS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
G-001
1/8" = 1'-0" G-001
1 GROUND FLOOR CODE ANALYSIS PLAN
1/8" = 1'-0"

OCCUPANCY
1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

GREEN BUILDING CHECKLIST
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
G-002
2019 CALIFORNIA GREEN BUILDING STANDARDS CODE NONRESIDENTIAL MANDATORY MEASURES

SECTION MEASURE REQUIREMENTS SHEET

REFERENCE

5.106.1

5.106.4

5.106.4

5.106.5.2

5.106.5.3

5.106.8

5.106.10

5.303.1

5.303.3

5.303.4

5.304.2

5.304.3

5.304.4

5.304.5

5.407

5.407.2.1

5.407.2.2

5.408.1

5.408.2

5.408.3

5.410.1

5.410.2

STORM WATER

POLLUTION

PREVENTION

BICYCLE PARKING

BICYCLE PARKING

DESIGNATED PARKING

FOR CLEAN AIR

VEHICLES

ELECTRICAL VEHICLE
(EV) CHARGING

LIGHT POLLUTION

REDUCTION

GRADING AND PAVING

WATER METERS

WATER CONSERVING

PLUMBING FIXTURES

FOOD WASTE

DISPOSERS

OUTDOOR WATER USE

OUTDOOR WATER USE

OUTDOOR WATER USE

GRAYWATER/

RAINWATER

WEATHER

PROTECTION

MOISTURE CONTROL

MOISTURE CONTROL

CONSTRUCTION

WASTE MANAGEMENT

UNIVERSAL WASTE

EXCAVATED SOIL AND

LAND CLEARING
DEBRIS

RECYCLING

COMMISSIONING

NEWLY CONSTRUCTED PROJECTS AND ADDITIONS WHICH DISTURB LESS THAN ONE ACRE OF

LAND SHALL PREVENT THE POLLUTION OF STORMWATER RUNOFF FROM THE CONSTRUCTION ACTIVITIES THROUGH ONE OR MORE OF THE FOLLOWING MEA SURES.

5.106.1.1 LOCAL ORDINANCE

5.106.1.2 BEST MANAGEMENT PRACTICES (BMP)

5.106.4.1.1 SHORT TERM BICYCLE PARKING. IF THE NEW PROJECT OR AN ADDITION OR

ALTERATION IS ANTICIPATED TO GENERATE VISITOR TRAFF IC, PROVIDE P ERMANENTLY ANCHORED BICYCLE RACKS WITHIN 200 FEET OF THE VISITORS' ENTRANCE , READILY VISIBLE TO PASSERS -BY, FOR 5 PERCENT OF NEW VISITOR MOTORIZED VEHICLE PA RKING SPACES BEING ADDED, WITH A MINIMUM OF ONE TWO -BIKE CAPACITY RACK.

EXCEPTION: ADDITIONS OR ALTERATIONS WHICH ADD NINE OR LESS VEHICULAR PARKI NG SPACES.

5.106.4.1.2 LONG TERM BICYCLE PARKING. FOR NEW BUILDINGS WITH 10 OR MORE OCCUPANTS OR FOR ADDITIONS OR ALTERATIONS THAT ADD 10 OR MORE TE NANT VEHICULAR SPACES, PROVIDE SECURE BICYCLE PARKING FOR 5 PERCENT O F THE TENANT VEHICULAR PARKING SPACES BEING ADDED, WITH A MINIMUM OF ONE SPAC E. ACCEPTABLE

PARKING FACILITIES SHALL BE CONVENIENT FROM THE STREET AND SHALL MEET ONE OF THE FOLLOWING: 1. COVERED LOCKABLE ENCLOSURES WITH PERMANENTLY A NCHORED RACKS FOR BICYCLES; 2. LOCKABLE BICYCLE ROOMS WITH PERMANENTLY A NCHORED RACKS; OR 3. LOCKABLE, PERMANENTLY ANCHORED BICYCLE LOCKERS.

IN NEW PROJECTS OR ADDITIONS OR ALTERATIONS THAT ADD 10 OR MORE VEHICULAR

PARKING SPACES, PROVIDE DESIGNATED PARKING FOR ANY COMBINATION O F LOW - EMITTING, FUEL EFFICIENT, AND CARPOOL / VAN POOL VE HICLES PER TA BLE 5.106.5.2.

CONSTRUCTION FACILITATING FUTURE INSTALLATION OF ELECTRICAL VEHI CLE SUPPLY EQUIPMENT (EVSE).

OUTDOOR LIGHT FIXTURES REQUIREMENTS.

CONSTRUCTION PLANS SHALL INDICATE HOW SITE GRADING OR A DRAINAGE SYSTEM WILL MANAGE ALL SURFACE WATER FLOWS TO KEEP WATER FROM ENTERING BUILD INGS.

SEPARATE SUBMETERS OR METERING DEVICES SHALL BE INSTALLED FOR TH E USES DESCRIBED IN SECTIONS 5.303.1.1 AND 5.393.1.2.

PLUMBING FIXTURES (WATER CLOSETS, URINALS, FAUCETS) SHALL COMPLY WITH NOTED EFFICIENCY REQUIREMENTS.

DISPOSERS SHALL MODULATE THE USE OF WATER OR AUTOMATICALLY SHUT OFF AFTER NO MORE THAN 10 MINUTES OF INACTIVITY.

OUTDOOR WATER USE IN LANDSCAPE AREAS EQUAL TO OR GREATER THAN 50 0 SQUARE FEET MUST MEET ONE OF TWO NAMED ORDINANCES.

OUTDOOR WATER USE IN REHABILITATED LANDSCAPE PROJECTS EQUAL TO O R GREATER THAN 2,500 SQUARE FEET MUST MEET ONE OF TWO NAMED ORDINANCES.

OUTDOOR WATER USE IN A PROJECT WITH 2,500 SQUARE FEET OR LESS OF LANDSCAPE AREA MUST COMPLY WITH THE PERFORMANCE OR PRESCRIPTIVE MWELO REQU IREMENTS.

GRAYWATER OR RAINWATER USE IN LANDSCAPE AREAS. FOR PROJECTS USI NG TREATED

OR UNTREATED GRAYWATER OR RAINWATER CAPTURED ON SITE, ANY LOT OR PARCEL WITHIN THE PROJECT THAT HAS LESS THAN 2,500 SQUARE FEET OF LANDS CAPE AND MEETS

THE LOT OR PARCEL'S LANDSCAPE WATER REQUIREMENT (ESTIMATED TOTAL WATER USE)

ENTIRELY WITH TREATED OR UNTREATED GRAYWATER OR THROUGH STORED R AINWATER CAPTURED ON SITE IS SUBJECT ONLY TO APPENDIX D SECTION (5).

PROVIDE A WEATHER -RESISTANT EXTERIOR WALL AND FOUNDATION ENVELOP E AS REQUIRED BY CBC SECTION 1403.2 (WEATHER PROTECTION) AND CALIFORN IA ENERGY CODE SECTION 150 (MANDATORY FEATURES AND DEVICES), MANUFACTURER'S INS TALLATION INSTRUCTIONS, OR LOCAL ORDINANCE, WHICHEVER IS MORE STRINGENT.

SPRINKLERS. DESIGN AND MAINTAIN IRRIGATION SYSTEMS TO PREVENT S PRAY ON STRUCTURES.

ENTRIES AND OPENINGS. DESIGN EXTERIOR ENTRIES SUBJECT TO FOOT T RAFFIC OR WIND - DRIVEN RAIN TO PREVENT WATER INTRUSION A 4 FOOT DEEP AWNING OR O VERHANG.

ALSO, INSTALL FLASHINGS INTEGRATED WITH THE DRAINAGE PLANE.

RECYCLE AND/OR SALVAGE FOR REUSE A MINIMUM OF 65 PERCENT OF THE NONHAZARDOUS CONSTRUCTION AND DEMOLITION WASTE PER AN APPROVED (1) CONSTRUCTI ON WASTE MANAGEMENT PLAN, (2) WASTE MANAGEMENT COMPANY, OR (3) WASTE STRE AM REDUCTION ALTERNATIVE. COMPLIANCE WITH A LOCAL CONSTRUCTION AND DEMOLITIO N WASTE MANAGEMENT ORDINANCE IS ALSO ACCEPTABLE, IF MORE STRINGENT. DOC UMENTATION MUST COMPLY WITH SECTION 5.408.1.4.

ADDITIONS AND ALTERATIONS SHALL REQUIRE VERIFICATION THAT UNIVER SAL WASTE

ITEMS SUCH AS FLUORESCENT LAMPS AND BALLAST AND MERCURY CONTAINI NG

THERMOSTATS AS WELL AS OTHER CALIFORNIA PROHIBITED UNIVERSAL WAS TE MATERIALS ARE DISPOSED OF PROPERLY AND ARE DIVERTED FROM LANDFILLS. 100 PERCENT OF TREES, STUMPS, ROCKS AND ASSOCIATED VEGETATION AN D SOILS

RESULTING FROM LAND CLEARING SHALL BE REUSED OR RECYCLED, UNLESS CONTAMINATED BY DISEASE OR PEST INFESTATION.

RECYCLING BY OCCUPANTS. PROVIDE READILY ACCESSIBLE AREAS SERVIN G THE ENTIRE

BUILDING, MEETING LISTED REQUIREMENTS OR COMPLYING WITH THE LOCA L ORDINANCE IF MORE RESTRICTIVE. FOR ADDITIONS WITH AN INCREASE OF 30 PERCENT OR MORE IN FLOOR AREA, PROVIDE RECYCLING ON SITE.

COMMISSIONING IS REQUIRED FOR NEW BUILDINGS 10,000 SQUARE FEET AND OVER.

SECTION MEASURE REQUIREMENTS SHEET

REFERENCE

5.504 POLLUTANT CONTROL 5.404.4.1 ADHESIVES, SEALANTS AND CAULKS. THESE SHALL MEET THE STATED REQUIREMENTS. ARCH 50 50
150
100
60 50
65 50
50 50
70 100
250
50 TABLE 5.504.4.1 - ADHESIVE VOC LIMIT 1,2
Less Water and Less Exempt Compounds in Grams per Liter

CURRENT VOC LIMIT

INDOOR CARPET ADHESIVES

CARPET PAD ADHESIVES

OUTDOOR CARPET ADHESIVES

WOOD FLOORING ADHESIVES

RUBBER FLOOR ADHESIVES

SUBFLOOR ADHESIVES

CERAMIC TILE ADHESIVES

VCT & ASPHALT TILE ADHESIVES

DRYWALL & PANEL ADHESIVES

COVE BASE ADHESIVES

MULTIPURPOSE CONSTRUCTION ADHESIVES

STRUCTURAL GLAZING ADHESIVES

SINGLY -PLY ROOF MEMBRANE ADHESIVES

OTHER ADHESIVES NOT SPECIFICALLY LISTED

ARCHITECTURAL APPLICATIONS

PVC WELDING

CPVC WELDING

ABS WELDING

PLASTIC CEMENT WELDING

ADHESIVE PRIMER FOR PLASTIC

CONTACT ADHESIVE

SPECIAL PURPOSE CONTACT ADHESIVE

STRUCTURAL WOOD MEMBER ADHESIVE

TOP & TRIM ADHESIVE
510
490
325
250
550
80 250
140
250

SPECIALTY APPLICATIONS

SUBSTRATE SPECIFIC APPLICATIONS

METAL TO METAL

PLASTIC FOAMS

POROUS MATERIAL (EXCEPT WOOD)
WOOD

FIBERGLASS
30 50
50 30
80 1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES

TOGETHER, THE ADHESIVE WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED.

2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO

MEASURE THE VOC CONTENT SPECIFIED IN THIS TABLE, SEE
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168,
WWW.ARB.CA.GOV/DRDB/SC/CURHTML/R1168.PDF
TABLE 5.504.4.2 - SEALANT VOC LIMIT
Less Water and Less Exempt Compounds in Grams per Liter

CURRENT VOC LIMIT

ARCHITECTURAL

MARINE DECK

NONMEMBRANE ROOF

ROADWAY

SINGLY -PLY ROOF MEMBRANE
OTHER
250
760
300
250
450
420

SEALANTS

ARCHITECTURAL

NONPOROUS
POROUS

MODIFIED BITUMINOUS

MARINE DECK
OTHER
250
775
500
760
750

SEALANT PRIMERS
NOTE: FOR ADDITIONAL INFORMATION REGARDING METHODS TO

MEASURE THE VOC CONTENT SPECIFIED IN THESE TABLES, SEE
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168.

5.504 POLLUTANT CONTROL 5.504.4.3 PAINTS AND COATINGS. THESE SHALL MEET THE STATED REQUIREMENTS. ARCH TABLE 5.504.4.3 - VOC CONTENT LIMITS FOR ARCHITECTURAL
COATINGS 2,3

GRAMS OF VOC PER LITER OF COATING, LESS WATER & LESS EXEMPT

COMPOUNDS

CURRENT VOC LIMIT

FLAT COATINGS

NONFLAT COATINGS

NONFLAT HIGH GLOSS COATINGS
50 100
150

COATING CATEGORY

ALUMINUM ROOF COATINGS

BASEMENT SPECIALTY COATINGS

BITUMINOUS ROOF COATINGS

BITUMINOUS ROOF PRIMERS

BOND BREAKERS

CONCRETE CURING COMPOUNDS

CONCRETE/MASONRY SEALERS

DRIVEWAY SEALERS

DRY FOG COATINGS

FAUX FINISHING COATINGS

FIRE RESISTIVE COATINGS

FLOOR COATINGS

FORM -RELEASE COMPOUNDS

GRAPHIC ARTS COATINGS (SIGN PAINTS)

HIGH -TEMPERATURE COATINGS

INDUSTRIAL MAINTENANCE COATINGS
LOW SOLIDS COATINGS 1

MAGNESITE CEMENT COATINGS

MASTIC TEXTURE COATINGS

METALLIC PIGMENTED COATINGS

MULTICOLOR COATINGS

PRETREATMENT WASH PRIMERS

PRIMERS, SEALERS, & UNDERCOATERS

REACTIVE PENETRATING SEALERS

RECYCLED COATINGS

ROOF COATINGS

RUST PRVENTATIVE COATINGS
400
400
50 350
350
350
100
50 150
350
350
100
250
500
420
250
120
450
100
500
250
420
100
350
50 250
250

SPECIALTY COATINGS
SHELLACS:

CLEAR
OPAQUE
730
550
100 SPECIALTY PRIMERS, SEALERS, & UNDERCOATERS
STAINS

STONE CONSOLIDANTS

SWIMMING POOL COATINGS

TRAFFIC MARKING COATINGS

TUB & TILE REFINISH COATINGS

WATERPROOFING MEMBRANES

WOOD COATINGS

WOOD PRESERVATIVES

ZINC -RICH PRIMERS
250
450
340
100
420
250
275
350
340

1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER &

EXEMPT COMPOUNDS

3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY

THE CALIFORNIA AIR RESOURCES BOARD, ARCHITECTURAL
COATINGS SUGGESTED CONTROL MEASURE, FEB. 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR RESOURCES BOARD.

2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN SUBSEQUENT COLUMNS IN THE TABLE.

5.504

5.504

POLLUTANT CONTROL

POLLUTANT CONTROL

5.504.4.4 CARPET SYSTEMS. THESE SHALL MEET THE STATED REQUIREMENTS.

5.504.4.5 COMPOSITE WOOD PRODUCTS. THESE SHALL MEET THE STATED REQUIREMENTS.

ARCH
NA
TABLE 5.504.4.5 - FORMALDEHYDE LIMITS 1

MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION

CURRENT LIMIT

HARDWOOD PLYWOOD VENEER CORE

HARDWOOD PLYWOOD COMPOSITE CORE

PARTICLE BOARD

MEDIUM DENSITY FIBERBOARD
THIN MEDIUM DENSITY FIBERBOARD 2

0.05 0.05

0.09 0.11

0.13 PRODUCT

1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE

CALIFORNIA AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE

FOR COMPOSITE WOOD AS TESTED IN ACCORDANCE WITH ASTM E
1333. FOR ADDITIONAL INFORMATION, SEE CALIFORNIA CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12.

2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16 INCHES (8 MM).

5.504

5.504

5.504

POLLUTANT CONTROL

POLLUTANT CONTROL

POLLUTANT CONTROL

5.504.4.6 RESILIENT FLOORING SYSTEMS. THESE SHALL MEET THE STATED REQUIREMENTS.

5.504.5.3 FILTERS. HVAC FILTERS SHALL MEET THE STATED REQUIREMENTS, WITH SOME EXCEPTIONS.

5.504.7 ENVIRONMENTAL TOBACCO SMOKE (ETS) CONTROL. RESTRICTIONS AND SIGNAGE REQUIREMENTS RELATED TO WHERE SMOKING IS ALLOWED.

ARCH
MECH
N/A
SHEET

REFERENCE

5.505

5.506

5.506

5.507

5.508

5.508

INDOOR MOISTURE

CONTROL

INDOOR AIR QUALITY

INDOOR AIR QUALITY

ENVIRONMENTAL

COMFORT

OUTDOOR AIR QUALITY

OUTDOOR AIR QUALITY

BUILDINGS SHALL MEET OR EXCEED THE PROVISIONS OF THE CALIFORNIA BUILDING CODE SECTIONS 1203 (VENTILATION) AND CHAPTER 14 (EXTERIOR WALLS).

5.506.1 OUTSIDE AIR DELIVERY. MEET THE MINIMUM VENTILATION REQUIREMENTS OF THE CALIFORNIA ENERGY CODE AND DIVISION 1, CHAPTER 4 OF CCR, TITLE 8 .

5.506.2 CARBON DIOXIDE (CO2) MONITORING. FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2 SENSORS AND CONTROLS SHALL BE SPECIFIED AND INSTALLED PER THE CALIFORNIA ENERGY CODE SECTION 1 20.1(C)(4).

5.507.4 ACOUSTICAL CONTROL. EXTERIOR WALL AND ROOF ASSEMBLIES TO MEET PRESCRIPTIVE OR PERFORMANCE SOUND TRANSMISSION CLASS REQUIREMENT S.

5.508.1 OZONE DEPLETION AND GREENHOUSE GAS REDUCTIONS. HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENTS SHALL NOT CONTAIN CFC'S OR HALON S.

5.508.2 SUPERMARKET REFRIGERANT LEAK REDUCTION.

MECH
MECH
MECH
N/A
MECH
N/A

SECTION MEASURE REQUIREMENTS SHEET

REFERENCE

5.410.4

5.410.4

5.410.4

5.410.4

5.410.4

5.503

5.504

5.504

TESTING AND

ADJUSTING

TESTING AND

ADJUSTING

TESTING AND

ADJUSTING

TESTING AND

ADJUSTING

TESTING AND

ADJUSTING

FIREPLACES

POLLUTANT CONTROL

POLLUTANT CONTROL
TESTING AND ADJUSTING OF SYSTEMS IS REQUIRED FOR NE W BUILDINGS L ESS THAN 10,000

SQUARE FEET OR NEW SYSTEMS TO SERVE AN ADDITION OR ALTERATION SU BJECT TO SECTION 303.1.

5.410.4.2 SYSTEMS. DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING SYSTEMS. SYSTEMS TO BE INCLUDED FOR TEST ING AND ADJUS TING SHALL INCLUDE, AS APPLICABLE TO THE PROJECT:

1. HVAC SYSTEMS AND CONTROLS. 2. INDOOR AND OUTDOOR LIGHTI NG AND CONTROLS.

3. WATER HEATING SYSTEMS. 4. RENEWABLE ENERGY SYSTE MS.

5. LANDSCAPE IRRIGATION SYSTEMS. 6. WATER REUSE SYSTEMS.

5.410.4.3 PROCEDURES. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND APPLICABLE STANDARDS ON E ACH SYSTEM.

5.410.4.3.1 HVAC BALANCING. IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW

SPACE -CONDITIONING SYSTEM IS OPERATED FOR NORMAL USE, BALANCE PE R STATED STANDARDS.

5.410.4.4 REPORTING. AFTER COMPLETION OF TESTING, ADJUSTING AND BALANCING,

PROVIDE A FINAL REPORT OF TESTING SIGNED BY THE IND IVIDUAL RESPO NSIBLE FOR PERFORMING THESE SERVICES.

5.410.4.5 OPERATION AND MAINTENANCE MANUAL. PROVIDE THE BUILDING OWNER OR

REPRESENTATIVE WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTI ONS AND COPIES OF GUARANTIES / WARRANTIES FOR EACH SYSTEM. O&M INSTRUCT IONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8, SECTION 5142 AND OTHER RELATED REGULATIONS.

INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUI RED BY THE ENFORCING AGENCY.

FIREPLACES MUST COMPLY WITH LISTED REQUIREMENTS.

5.504.1 TEMPORARY VENTILATION. REQUIREMENT ADDRESSES USE AND PROTECTION OF PERMANENT HVAC SYSTEM DURING CONSTRUCTION.

5.504.3 COVERING OF DUCT OPENINGS AND PROTECTION OF MECHANICAL E QUIPMENT DURING CONSTRUCTION. SECTION OUTLINES REQUIREMENTS.

MECH/ ELEC

MECH/ ELEC
MECH

MECH/ ELEC

MECH/ ELEC
N/A; NO

FIREPLACE IN
PROJECT.

MECH
MECH
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

CONTRACTOR

CONTRACTOR
N/A
N/A
N/A
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
24" MIN FOR EXTERIOR DOORS
(CA BUILDING CODE)

PULL SIDE

PUSH SIDE

PULL SIDE

PUSH SIDE

PULL SIDE
HINGE SIDE APPROACHES [404.2.4] D
FRONT APPROACHES [404.2.4] A LATCH SIDE APPROACHES [404.2.4] B TWO HINGED DOORS IN SERIES [404.2.6] C
5' - 0" MIN
CLEAR
4' - 0" MIN
CLEAR
5' - 0" MIN
CLEAR
4' - 0" MIN
CLEAR
4' - 0" MIN
(36" MIN)
3' - 6" MIN
5' - 0" MIN
MIN
2' - 0"
MIN
2' - 0"
3' - 6" MIN
*
12"
18"
48" MIN WHEN DOOR PROVIDED WITH
CLOSER
*IF DOOR HAS BOTH

CLOSER & LATCH
REACH RANGES [308] A
2' - 6"
2' - 10" MAX
10"-24"
NOTES:

1. Z NOT LESS THAN X.

2. WHEN X < 20", THEN Y = 48" MAX.

3. WHEN X IS 20 -25", THEN Y = 44" MAX.

4. MAX COUNTER HEIGHT,
H = 34" MAX AT WORKSURFACE
4' - 0"
(X)
(X) FOWARD REACH, 25" MAX
(Z) CLEAR FLOOR SPACE

OPERABLE
PART
PROTRUDING OBJECTS [307] B
X > 27"
X >= 80"
0' - 4" MAX
CIRCULATION AISLE 3' - 10" MAX

FRONT APPROACH SIDE APPROACH
(Y) HIGH FORWARD REACH
H
MIN

1'- 3"4' - 0" MAX
MIN
1' - 3" 4' - 0" MAX

TOE AND KNEE CLEARANCES
CLEAR WIDTH AT 180° TURN

A T-SHAPED TURNING SPACE
D
C
(60" MIN)
48" MIN
(36" MIN)
3' - 6" MIN
(36" MIN)
3' - 6" MIN
1' - 0" MIN 3' - 0" MIN 1' - 0" MIN
3' - 0" MIN
2' - 0" MIN 5' - 0" MIN
5' - 0" MIN

THE SPACE SHALL BE

PERMITTED TO INCLUDE

KNEE AND TOE

CLEARANCE ONLY AT THE

END OF EITHER THE BASE
OR ONE ARM.

THE SPACE SHALL BE

PERMITTED TO

INCLUDE KNEE AND
TOE CLEARANCE.
1' - 6"
0' - 9"
0' - 11"
0' - 6" MAX
17" MIN - 25" MAX
2' - 3"

KNEE CLEARANCE

TOE CLEARANCE
30" WIDE MIN TOE AND

KNEE CLEARANCE

CIRCULAR TURNING SPACE B
0' - 8"

KNEE CLEARANCE

MIN 27 "

KNEE CLEARANCE

MIN 29 "
CLOCK
OR

CLOCK OUTLET

MANUAL FIRE ALARM PULL

STATION

LIGHT SWITCH DUPLEX OUTLETS INTERCOM STATION TELEPHONE OUTLET OR

DATA OUTLET

THERMOSTAT
OR

FIRE ALARM

SPECIAL PURPOSE

OUTLETS

JUNCTION BOX WALL MTD TELEPHONE AND
OUTLET

CARD READER,

LOCAL ALARM,

OR ARMING STATION

SWITCH, THERMOSTAT,

AND/OR OUTLET AT DOOR
(LATCH SIDE)

AUDIBLE & VISUAL FIRE ALARM
OR

SECURITY STROBE LIGHT
(BLUE LIGHT)

FIREMAN'S TELEPHONE JACK

WALL -MOUNTED EXIT SIGN AT

EXIT DOOR
7' - 0"

LOW REACH
15" MIN
4' - 0"
6' - 8" MIN
5' - 0"
6"

FRAME HEIGHT
0' - 4" EQ EQ
3"

REQD SIGNAGE AT

RESTROOM ENTRY DOOR

FEC OR FHV CABINET FE / WALL MOUNTED

FIRE EXTINGUISHER

COAT HOOKS
(WALL -MTD)

UTILITY SHELF
EQ EQ
42" MIN, 60" MAX
4' - 0" TYPICAL
0' - 6" MIN
5'-0" WHEN MTD ON TOILET PARTITION
6' - 0"

ACCESSIBLE
MAX 4' - 0"

TO TOP OF SHELF
5' - 6"

LOW REACH
1' - 3" MIN 4' - 0" MAX HIGH REACH

LOCKER UNIFORM LOCKER
NOTE: AT LEAST 5% (NOT LESS THAN 1) OF THE
LOCKERS SHALL BE ACCESSIBLE. CLEAR FLOOR

SPACE MUST BE PROVIDED AND SHELVING AND

OPERABLE PARTS MUST BE WITHIN THE REACH
RANGES AS DESCRIBED ON .

HIGH REACH
48" MAX
4"
LOCATE 3" ABOVE DOOR

FRAME WHEN DIM ABOVE
DOOR IS 12" OR GREATER
ALTERNATE 2: MOUNT EXIT

SIGN LOW ON STRIKE SIDE

AS NOTED ON PLANS
ALTERNATE 1: ALIGN WITH TOP
OF DOOR FRAME WHEN DIM.

ABOVE DOOR HEAD < 12".

MOUNT ON STRIKE SIDE
12"

COAT HOOKS (DOOR -MTD)
EQ EQ
6' - 0"
0' - 4" TYPICAL

MOP/BROOM HOOKS AS
SPECIFIED.

TOP OF MOUNTING

BRACKET
4' - 0" MAX HANDLE HT
4' - 8" TYPICAL

WALL MTD TACTILE SIGN
MOUNT ON STRIKE SIDE.

DOOR MTD SIGNAGE.
12" MAX
9" MIN

CHALKBOARD, TACKBOARD,

OR DRY MARKER BOARD
4'-0" MAX
3' - 6" TYPICAL

ALIGN WITH ADJ DATUM TYPICAL
0' - 8" TYP

FULLY OPENED
DOOR
0' - 8" MIN

SWITCH, THERMOSTAT,

AND/OR OUTLET AT DOOR
(HINGE SIDE)
(HIGH)
(LOW)
(TYP)
(LOW)
(TYP)
(HIGH)
(OUTLET

AT DESK)
(TYP)
(HIGH)
ALIGN
/2 G-101
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

TYPICAL MOUNTING HEIGHTS &

ACCESSIBILITY DETAILS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
G-101
1/4" = 1'-0" G-101
4 FLOOR CLEARANCE
1/4" = 1'-0" G-101
2 REACH RANGES AND PROTRUDING OBJECTS
1/4" = 1'-0" G-101
3 WHEEL CHAIR TURNING SPACE AND TOE

AND KNEE CLEARANCES
1/2" = 1'-0" G-101
1 STANDARD MOUNTING HEIGHTS

GENERAL NOTES

A THE PURPOSE OF THIS SHEET IS TO ILLUSTRATE TYPICAL MOUNTING HEIGHTS AND THE MINIMUM AND MAXIMUM CLEARANCES OF A

VARIETY OF ITEMS AND SHALL APPLY UNLESS SPECIFICALLY NOTED OR DIMENSIONED OTHERWISE ON THE ARCHITECTURAL SET OF DRAWINGS.

B IT IS THE INTENT OF THIS DESIGN TO PROVIDE ALL ITE MS SHOWN TO BE ACCESSIBLE TO MEET ALL APPLICABLE BUILDING AND ACCESSIBILITY CODES. IF A CONFLICT IS DISCOVERED, THE APPROVED CODE REQUIREMENTS TAKE PRECEDENCE. INFORM THE ARCHITECT OF ANY CONFLICTS BEFORE INSTALLATION.

C THIS SHEET MAY ILLUSTRATE ITEMS THAT DO NOT OCCUR IN THE SCOPE OF WORK OF THIS PROJECT.

D MOUNTING HEIGHTS OR CONFIGURATIONS FOR ITEMS NOT S HOWN ON THIS DRAWING MAY BE ILLUSTRATED ON OTHER DRAWINGS WITHIN THIS DRAWING SET OR NOTED IN THE PROJECT SPECIFICATIONS.

F FIXTURES AND ACCESSORIES SHOWN ON THIS SHEET ARE T YPICAL AND NOT INTENDED TO BE SPECIFIC TO ANY ONE MANUFACTURER. REFER TO PROJECT SPECIFICATIONS FOR A LIST OF APPROVED MANUFACTURERS. FIXTURES AND ACCESSORIES

THAT ARE SPECIFIED MAY HAVE DIFERENT SIZE AND CONFIGURATION REQUIREMENTS, IT IS THE CONTRACTORS RESPONSIBILITY TO MEET THE AESTHETIC AND FUNCTIONAL DESIGN INTENT OF THIS DRAWING SET. 05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D

CONFERENCE SUPERVISORS

DISPATCH
(EXIST) MEN
QUIET
25 (EXIST)

UNIFORM
23 (EXIST) MENS

RESTROOM
SHOWER
22 (EXIST)

DRIVER'S ROOM
20 (EXIST)

TRAINING ROOM
30 (EXIST) ELEC
28 (EXIST) KITCHEN
21 (EXIST) AV
EQUIP
29 (EXIST) MEN
QUIET
25 (EXIST)

UNIFORM
23 (EXIST)

DRIVER'S ROOM
20 (EXIST)

TRAINING ROOM
30 (EXIST) ELEC
28 (EXIST) MENS

RESTROOM
27 1
1 1
2 3
4 4
E
(EXIST) COMP

SRV DATA COM
70 10
TYP
11 TYP
12 13
6' - 9"
17 17
17 17 17 17
17 18 18
17 2
A
C
B
1 D
55 5
6 7 7
88 55
99 E
7 TYP
15 16
TYP
15 2
A
C
B
1 D
E
14 14 14

EXISTING WALLS TO BE DEMOLISHED

EXISTING WALLS TO REMAIN

EXISTING DOORS TO BE DEMOLISHED

EXISTING DOORS TO REMAIN

CEILINGS TO BE DEMOLISHED

DEMOLITION LEGEND
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
1/8" = 1'-0"
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

DEMOLITION PLANS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
AD-01
1/8" = 1'-0" AD-01
1 FLOOR PLAN - DEMO
1/8" = 1'-0" AD-01
2 RCP - DEMO
1/8" = 1'-0" AD-01
3 ROOF DEMO

DEMOLITION NOTES
S CONTRACTOR TO SURVEY AREA OF WORK FOR EXISTING ACCESS PANELS. EXISTING ACCESS PANELS IN AREA OF WORK TO BE DEMOLISHED AS NEEDED. NEW ACCESS PANELS

ARE REQUIRED TO BE INSTALLED IN RENOVATED AREAS TO MAINTAIN ACCESS TO NEW AND EXISTING EQUIPMENT.

T REMOVE, SALVAGE, AND REINSTALL OR PROTECT IN PLACE ALL EQUIPMENT NOT OTHERWISE INDICATED TO BE DEMOLISHED OR REPLACED. CONTRACTOR TO SURVEY AREA

OF WORK PRIOR TO START OF WORK TO IDENTIFY ALL EXISTING DEVICES AND EQUIPMENT TO REMAIN.

U FIELD VERIFY THE EXISTING MECHANICAL HOT WATER PIPING ROUTING AND DEMO EXISTING CEILING AS NEEDED FOR ACCESS. PATCH AND PAINT THE EXISTING CEILING.

V CONTRACTOR TO PATCH AND PAINT WALLS AS NEEDED, WHERE EXISTING ELECTRICAL OUTLETS ARE REPLACED WITH NEW ELECTRICAL OUTLETS.

W DEMOLISH ALL FLOORING AND WALL BASE IN CIRCULATION AREAS AND REPLACE WITH THE FLOORING AND WALL BASE AS NOTED ON FINISH PLAN A-701.

DEMOLITION NOTES
G REMOVE ALL ELECTRICAL DEVICES WITHIN THE DEMOLISHED WALLS. REFER TO ELECTRICAL PLANS FOR DEVICES TO BE REINSTALLED OR PROTECTED IN PLACE.

J DEMOLISH ALL FLOOR FINISHES AND WALL BASE IN AREA OF WORK, U.N.O. PREP FOR NEW FINISH.

K GC SHALL REMOVE ANY EXISTING FIRE EXTINGUISHER CABINETS AND SALVAGE EQUIPMENT FOR REUSE.

L COORDINATE ALL STORAGE AND CONSTRUCTION LOGISTICS OF EXISTING G-TRANS EQUIPMENT AND FURNISHINGS WITH G-TRANS AND/OR RESPECTIVE VENDOR AS REQUIRED.

M FULLY REMOVE UTILITIES TO THE SOURCE AND PREP FOR NEW WORK AS REQUIRED.

N REMOVE ALL EXISTING ABANDONED PLUMBING AND ELECTRICAL ASSOCIATED WITH DEMOLISHED FIXTURES, U.N.O.

P REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR FURTHER SALVAGE AND DEMOLITION INFORMATION.

R ALL FIXTURES, DOORS, HARDWARE, SIGNAGE, ETC. TO BE DEMOLISHED ARE TO BE SALVAGED AT G-TRANS' REQUEST, U.N.O.

DEMOLITION NOTES
A CONTENT KEYNOTED ON DRAWING IS EXISTING UNLESS NOTED OTHERWISE.

B THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HIS/HER BEST SKILLS AND ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL

CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER CONTRACT.

C THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS ON THE SITE AND NOTIFY ARCHITECT OF ANY DISCREPANCIES IN WRITING BEFORE STARTING ANY WORK.

D EXISTING WALLS, FLOORS, CEILINGS AND ALL EXPOSED SURFACES THAT HAVE BEEN

DAMAGED OR DISTURBED BY DEMOLITION OR CONSTRUCTION WORK SHALL BE REPAIRED,

REPLACED AND/OR RECONDITIONED SUCH THAT THEY CANNOT BE DISTINGUISHED FROM NEW OR ADJACENT EXISTING SURFACES AND FINISHES.

E REFER TO CONSTRUCTION PLAN AND REFLECTED CEILING PLAN FOR NEW LAYOUT DIMENSIONS TO DETERMINE EXTENT OF DEMOLITION. DEMOLITION SHALL BE PERFORMED TO THE MINIMUM EXTENT POSSIBLE TO ACHIEVE NEW LAYOUT REQUIREMENTS.

F ALL WALLS NOTED TO BE REMOVED SHALL BE FULLY REMOVED. CONSULT THE CONSTRUCTION PLAN TO CONFIRM EXTENT. NO PONY WALLS ABOVE THE CEILING TO REMAIN. RE-ATTACH/ RELOCATE ANY REQUIRED ITEMS TO REMAIN WHICH MAY HAVE BEEN ATTACHED TO WALL.

KEYNOTES
14 REMOVE EXISTING MECHANICAL UNIT AND ASSOCIATED DUCTWORK,

WHERE THE EXISTING DUCTS REMOVED CONTRACTOR TO PATCH THE

ROOF PENETRATIONS WITHIN THE CURRENT WARRANTY

REQURIEMENTS OF THE EXISTING ROOF MANUFACTURER
15 PROVIDE TEMPORARY SUPPORT/BRACING FOR EXISTING ACT CEILING

UNTIL NEW WALL IS IN PLACE
16 PROVIDE SUPPORT/BRACING (AS NEEDED) FOR EXISTING ACT CEILING WHERE ADJACENT EXISTING WALL(S) HAS BEEN DEMOLISHED.
17 DEMO WALL
18 WALL TO REMAIN

KEYNOTES
1 DEMO DOOR, FRAME AND ALL ASSOCIATED HARDWARE
2 REMOVE AND RELOCATE THE MAILBOXES
3 DEMO WINDOW AND OVERHEAD SECURITY GRILLE
4 DEMO CASEWORK
5 DEMO ALL CEILINGS, LIGHT FIXTURES, AND ALL OTHER M ISC ITEMS 6 DEMO CEILING, LIGHT FIXTURES, AND ALL OTHER MISC I TEMS 7 EXISTING GYPSUM BOARD CEILING TO REMAIN
8 EXISTING ACT CEILING TO REMAIN
9 EXISTING ACT GRID TO REMAIN, ALL EXISTING ACOUSTIC AL CEILING

TILES TO BE REPLACED
10 EXISTING MAILBOX KEY PANEL TO BE RELOCATED
11 EXISTING FIRE ALARM ANNUNCIATOR PANELS (3) TO BE RELOCATED 12 EXISTING LOCKER KEY PANELS TO BE RELOCATED
13 EXISTING GENERATOR CONTROL PANEL TO BE RELOCATED
1 1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
X-X
II. DESIGN LOADS:

1. DEAD LOAD: THE SELF WEIGHT OF THE STRUCTURE.

2. SUPERIMPOSED DEAD LOAD:

A. CLADDING 15 PSF
B. FLOOR LEVEL:
a. CEILING 5 PSF
b. MEP 10 PSF
C. ROOF LEVEL:
a. ROOFING 5 PSF
b. MEP 10 PSF

3. LIVE LOAD:

A. ROOFS: 20 PSF
B. ROOF TERRACES: 100 PSF
C. PUBLIC AREAS, STAIRS, CORRIDORS 1ST FLOOR: 100 PSF
D. CORRIDORS: 80 PSF
E. LIGHT STORAGE: 125 PSF
F. OFFICES: 50 PSF
G. PARTITIONS: 15 PSF
H. STAIRS: 100 PSF

4. WIND LOAD
A. ULTIMATE DESIGN BASIC WIND SPEED V(ult) = 90 MPH
B. NOMINAL DESIGN WIND SPEED V(asd) = 70 MPH
C. RISK CATEGORY = II
D. WIND IMPORTANCE FACTOR = 1.0
E. WIND EXPOSURE CATEGORY = B
F. ENCLOSURE CATEGORY: ENCLOSED
G. INTERNAL PRESSURE COEFFICIENT (GCPi): +/ - 0.18
H. GUST EFFECT FACTOR (G): 0.85
I. COMPONENT AND CLADDING LOADS

5. SEISMIC LOAD
A. SITE CLASS = D
B. RISK CATEGORY = II
C. SEISMIC IMPORTANCE FACTOR = 1.00
D. MAPPED SPECTRAL RESPONSE
a. SHORT PERIOD S S = 1.828 g
b. 1-SECOND PERIOD S 1 = 0.646 g
E. DESIGN SPECTRAL RESPONSE (5% DAMPED)
a. SHORT PERIOD S DS = 1.462 g
b. 1-SECOND PERIOD S D1 = 0.732 g
F. SEISMIC DESIGN CATEGORY: D
V. MECHANICAL/ELECTRICAL/PLUMBING SYSTEM SUPPORTS

1. THE CONTRACTOR SHALL DESIGN AND SUPPLY ALL ADDITION AL MISCELLANEOUS METALS

AND SYSTEM SUPPORT COMPONENTS THAT ARE NECESSARY T O SUPPORT ALL MECHANICAL, ELECTRICAL (TELECOM, AUDIO VISUAL, ETC. ) AND PLUMBING/FIRE PROTECTION SYSTEMS. SUCH METALS AND SUPPORT COMPO NENTS AND THEIR

CONNECTIONS SHALL BE PROVIDED AS NECESSARY TO DIREC TLY AND CONCENTRICALLY IMPOSE LOADS ON THE PRIMARY STRUCTURE. STEEL ROOF DECK SHALL NOT DIRECTLY SUPPORT THESE SYSTEMS.

I. GENERAL NOTES:

1. ALL STRUCTURAL WORK SHALL CONFORM TO THE DRAWINGS, THE PROJECT SPECIFICATIONS, ALL DRAWING NOTES, AND THE 2019 CAL IFORNIA BUILDING CODE (CBC).

2. ALL APPLICABLE REFERENCE STANDARDS, AS MODIFIED BY THE BUILDING CODE, INCLUDE:

A. ASCE/SEI 7 -16: MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER ST RUCTURES B. ACI 318 -14: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE C. AISC 360 -16: SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS D. AISC 341 -16: SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDIN GS E. AWS D1.1: STRUCTURAL WELDING CODE - STEEL
F. ACI 117 -10: STANDARD SPECIFICATIONS FOR TOLERANCES FOR CONC RETE

CONSTRUCTION AND MATERIAL
G. TMS 402 -16: BUILDING CODE FOR MASONRY STRUCTURES
H. TMS 602 -16: SPECIFICATION FOR MASONRY STRUCTURES
I. AISI SPECIFICATION FOR THE DESIGN OF COLD -FORMED STEEL STRUCTURAL MEMBERS, 2016

3. THE SCOPE OF WORK IS NOT SOLELY DEFINED BY THESE DO CUMENTS.

4. TYPICAL DETAILS APPLY THROUGHOUT THE PROJECT, EVEN IF NOT SPECIFICALLY REFERENCED IN PLANS OR DETAILS. DETAILS OF CONSTRUC TION NOT FULLY SHOWN OR

NOTED ON THE DRAWINGS NOR CALLED OUT IN THE SPECIFI CATIONS SHALL BE OF THE SAME SIZE AND CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN AND NOTED.

5. ALL FORCES INDICATED IN THE STRUCTURAL DRAWINGS ARE SERVICE LOADS AS DEFINED BY ASCE -7, UNLESS NOTED OTHERWISE.

6. DO NOT USE SCALED DIMENSIONS; USE ONLY WRITTEN DIME NSIONS. WHERE NO DIMENSION

IS PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATIO NS BEFORE PROCEEDING WITH WORK.

7. SEE ARCHITECTURAL DRAWINGS FOR SITE POSITIONING AND PROJECT DATUM, REFERENCE IS ( 0' -0") AS SHOWN ON ARCHITECTURAL DRAWINGS.

8. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE

INCLUDING SAFETY OF PERSONS AND PROPERTY AND THE ME ANS AND METHODS OF CONSTRUCTION.

9. STRUCTURAL ELEMENTS SHALL BE CENTERED ABOUT GRIDLINES OR DIMENSION LINES, UNLESS OTHERWISE NOTED.

10. THE CONTRACTOR SHALL PROVIDE ENGINEERED DESIGNS OF TEMPORARY SHORING AND

BRACING AND MAKE SAFE ALL FLOORS, ROOFS, WALLS, EXC AVATIONS AND ADJACENT PROPERTY AS PROJECT CONDITIONS AND LOCAL BUILDING C ODE REQUIRE.

11. ALL STRUCTURAL WORK SHALL BE COORDINATED WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, ETC. REQUIREMENTS. REFER TO A RCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN ON PLAN. DISCREPANCIES AND/OR INTERFERENCES SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY.

12. OPENINGS SHALL NOT BE MADE IN ANY STRUCTURAL MEMBER UNLESS SPECIFICALLY SHOWN ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE STRUC TURAL ENGINEER.

13. DEFICIENT WORK AND WORK NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS AS

IDENTIFIED BY THE ARCHITECT OR INSPECTOR SHALL BE R EPAIRED AT THE CONTRACTOR'S EXPENSE. CONTRACTOR SHALL COMPENSATE OWNER FOR SERV ICES ARISING FROM DEFICIENT WORK.

14. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY REQUIRED DEWATERING OF THE SITE DURING CONSTRUCTION.

15. THE CONTRACTOR SHALL PREPARE ENGINEERED DESIGN AND SHALL BE RESPONSIBLE FOR

CONFIRMING ADEQUACY OF AS BUILT STRUCTURE FOR ALL S URCHARGE LOADS RESULTING

FROM COMPACTION AS WELL AS CRANES TRUCKS, BULLDOZER S OR ANY OTHER CONSTRUCTION EQUIPMENT. ENGINEERED DESIGNS SHALL BE PREPARED, SIGNED AND

SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE J URISDICTION AND SUBMITTED TO ENGINEER OF RECORD FOR REVIEW.

16. THE STRUCTURAL COMPONENTS BY THEMSELVES ARE A NON -SELF -SUPPORTING STRUCTURE. LATERAL FORCES DUE TO WIND, EARTHQUAKE, OR SOIL ARE CARRIED BY THE ROOF AND FLOOR DIAPHRAGMS TO THE LATERAL SYSTEM. CE RTAIN ELEMENTS SHOWN ON

THE STRUCTURAL DRAWINGS (SUCH AS BRACING, ROOF AND FLOOR SLABS, AND CONCRETE

IN COMPOSITE COLUMNS) ARE REQUIRED FOR OVERALL OR L OCAL STABILITY OF OTHER ELEMENTS (SUCH AS BEAMS, COLUMNS, AND WALLS). IF DU E TO SEQUENCING OF

CONSTRUCTION, THESE STABILITY ELEMENTS ARE NOT IN P LACE, THE CONTRACTOR SHALL

RETAIN A STRUCTURAL ENGINEER LICENSED TO PERFORM TH E WORK IN THE JURISDICTION

WHERE THE PROJECT IS LOCATED, WHO SHALL INVESTIGATE WHERE TEMPORARY SHORING/BRACING IS REQUIRED AND SHALL DESIGN THIS T EMPORARY SHORING/BRACING.

THE CONTRACTOR SHALL PROVIDE THIS SHORING/BRACING U NTIL THE REQUIRED

STRUCTURAL ELEMENTS AND THEIR CONNECTIONS HAVE BEEN INSTALLED AND REACH THEIR FINAL DESIGN STRENGTHS.

17. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT WHEN PLA CED ON FRAMED FLOORS OR ROOFS. THE CONSTRUCTION MATERIAL LOAD SHALL NOT EXC EED THE DESIGN LIVE LOAD PER SQUARE FOOT. CONTRACTOR SHALL BE RESPONSIBLE FO R SHORING WHERE STRUCTURE IS NOT COMPLETE OR HAS NOT ATTAINED DESIGN STRENGTH.

18. BUILDING TOLERANCES: STANDARD TOLERANCES SHALL BE BASED ON THE REQUIREMENTS OF THE AISC CODE OF STANDARD PRACTICE AND ACI 117, STANDARD SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS.

III. COLD FORMED METAL FRAMING (CFMF)

1. STRUCTURAL MEMBERS SHALL BE AS NOTED ON THE STRUCTU RAL DRAWINGS AND CONFORM TO ASTM C955 AND ASTM A653. MINIMUM YIELD STRENGTH:

A. 43 MILS (18 GA) AND THINNER 33ksi
B. 54 MILS (16 GA) AND THICKER 50ksi

2. MINIMUM SIZE, THICKNESS, AND OTHER SECTION PROPERTI ES SHALL COMPLY WITH THE STEEL STUD MANUFACTURER'S ASSOCIATION (SSMA) SPECIF ICATIONS AND ICC -ES 3064P.

CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPRO VAL FOR SUBSTITUTIONS.

3. WELDING:

A. WELDING ELECTRODES SHALL BE CLASS E60XX
B. WELDS SHALL BE PERFORMED BY QUALIFIED WELDERS.

C. WELDING SHALL COMPLY WITH AWS D1.3.

D. ALL FIELD WELDING SHALL BE SPECIALLY INSPECTED.

E. METAL FRAMING THINNER THAN 18 GAUGE SHALL NOT BE WE LDED.

4. SCREWS SHALL BE SELF -TAPPING AND COMPLY WITH ASTM C1513.

5. TRACK MEMBERS SHALL BE MINIMUM SAME GAGE AS ATTACHE D STUDS. TRACKS REQUIRED AT TOP AND BOTTOM OF ALL WALLS. STUDS SHALL BEAR F LAT ON THE WEB OF TRACKS, SEE DETAILS FOR ATTACHMENT. CONTINUOUS TRACKS SHALL BE WELDED OR SCREWED, WIRE TIES ARE NOT PERMITTED.

6. WEB PUNCH -OUTS SHALL BE GREATER THAN 10" FROM ENDS OR BEARING POINTS.

COORDINATE LOCATIONS WITH BRACING.

7. BRIDGING SHALL BE SPACED AT 5' -0" MAX, SEE TYPICAL DETAILS.

8. INTERIOR AND EXTERIOR PARTITIONS SHALL CONSIST OF I CBO APPROVED METAL STUD TYPE FRAMING. CONNECTION OF STUDS, TRACK, AND OTHER ITEMS BY MEANS OF EITHER

DRILLED IN ANCHORAGE OR POWDER DRIVEN FASTENERS SHA LL OCCUR WITH ICBO APPROVED FASTENERS. CONNECTIONS SHALL ALLOW FOR T HE BUILDING MOVEMENTS CITED ABOVE. THE CONTRACTOR SHALL BE RESPONSIBLE FO R THE STRUCTURAL

ENGINEERING DESIGN OF SOFFITS, SUSPENDED WALLS, CEI LING OR CONDITIONS WHERE

THE STUD FRAMING IS USED TO SUPPORT CASEWORK OR SIZ EABLE DOOR/ WINDOW

HARDWARE,THE METAL STUD FRAMING AND ANY MISCELLANEO US STEEL FRAMING THAT IS DETERMINED TO BE NECESSARY BASED ON THE CONTRACTORS DESIGN. SUBMIT SEALED

CALCULATIONS AND SHOP DRAWINGS INDICATING IMPOSED L OADS ON THE PRIMARY STRUCTURE FOR THESE CONDITIONS.

5. SCREW ANCHORS INSTALLED INTO CONCRETE OR GROUT -FILLED CMU A. "TITEN HD" BY SIMPSON STRING -TIE (ESR -2713; ESR -1056) B. "KH -EZ" BY HILTI, INC. (ESR -3027; ESR -3056)
C. "SCREW -BOLT+" BY DEWALT (ESR -3889; ESR -4042)

6. ADHESIVE ANCHORS: ASTM A36 THREADED RODS WITH ASTM A 563 GRADE A NUTS AND ANSI B18.22.1 TYPE A WASHERS, UNLESS OTHERWISE NOTED. ANCHORS DESIGNATED AS ASTM A193 GRADE B7 THREADED RODS TO USE ASTM A 563 GRADE DH HEAVY HEX NUTS AND ASTM F 436 WASHERS.

7. ADHESIVE DOWELS: ASTM A615 GRADE 60 REINFORCING STE EL.

8. ALL ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH ICC -ES REPORT AND MANUFACTURERS RECOMMENDATIONS.

9. UNLESS OTHERWISE NOTED, PROVIDE MINIMUM EMBEDMENT O F ANCHORS PER ICC -ES REPORT & MANUFACTURERS RECOMMENDATIONS.

10. CONFIRM FINAL ANCHOR LOCATIONS PRIOR TO FABRICATING PLATES, MEMBERS, OR OTHER STEEL ASSEMBLIES ATTACHED WITH MECHANICAL OR ADHESI VE ANCHORS.

11. PRIOR TO ALL DRILLING OR CORING, THE CONTRACTOR SHA LL (1) VERIFY THE EXISTING

CONCRETE OR MASONRY THICKNESS TO PREVENT DAMAGE TO THE OPPOSITE FACE OF CONCRETE AND MAINTAIN 1 -1 /2 ” CLEAR COVER U.N.O., AND (2) IDENTIFY EXISTING REINFORCING LOCATIONS BY PACHOMETER, PROBING, CHIPP ING, ETC. TO AVOID DAMAGE EXISTING REINFORCING.

12. IF REINFORCEMENT IS ENCOUNTERED DURING DRILLING, AB ANDON AND SHIFT THE HOLE LOCATION TO AVOID THE REINFORCEMENT. PROVIDE A MINI MUM OF 2 ANCHOR DIAMETERS OR 1 INCH, WHICHEVER IS LARGER, OF SOUND CONCRETE B ETWEEN THE DOWEL AND THE ABANDONED HOLE. FILL THE ABANDONED HOLE WITH NON -SHRINK GROUT. IF THE ANCHOR

OR DOWEL MAY NOT BE SHIFTED AS NOTED ABOVE, THE ENG INEER WILL DETERMINE A NEW LOCATION.

13. ADHESIVE ANCHORS INSTALLED IN HORIZONTAL TO VERTICA LLY OVERHEAD ORIENTATION TO

SUPPORT SUSTAINED TENSION LOADS SHALL BE DONE BY A CERTIFIED ADHESIVE ANCHOR INSTALLER (AAI) CERTIFIED THROUGH ACI/CRSI OR EQUIV ALENT (ACI 318 -14 17.8.2.2)

14. ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE AGED A MINIMUM OF 21 DAYS (ACI 318 -14 17.1.2)
VI. QUALITY ASSURANCE AND SPECIAL INSPECTIONS

1. OWNER WILL ENGAGE AN INDEPENDENT TESTING AGENCY TO PERFORM THE TESTS AND INSPECTIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE PRIOR NOTICE TO ALLOW FOR COMPLETION OF THESE REQUIREMENT S.

2. CONTRACTOR SHALL SUBMIT A STATEMENT OF RESPONSIBILI TY TO THE BUILDING

DEPARTMENT AND OWNER PRIOR TO WORK ON WIND OR SEISM IC FORCE RESISTING

SYSTEMS AND COMPONENTS WHICH ARE LISTED IN THE STAT EMENT OF SPECIAL INSPECTIONS.

VII. EXISTING STRUCTURE & EXISTING CONDITIONS

1. CONTRACTOR IS TO NOTIFY ENGINEER OF QUESTIONABLE EX ISTING STRUCTURAL COMPONENTS (MASONRY WALLS, STEEL BEAMS & LINTEL, EX POSED FOUNDATIONS, ETC.) AND FRAMING CONNECTIONS WHEN ENCOUNTERED.

2. GRIDLINES ARE SHOWN ON THE STRUCTURAL DRAWINGS AND THESE REFLECT ASSUMED ARCHITECTURAL AND STRUCTURAL DIMENSIONS. IN MOST C ASE, GRID LINES COINCIDE WITH EXISTING COLUMN AND PILASTER CENTERLINES. IF ACTUA L FIELD DIMENSIONS VARY, NOTIFY ARCHITECT OR ENGINEER.

3. CONTRACTOR TO VERIFY EXACT LOCATION OF ALL EXISTING STRUCTURAL COMPONENTS THAT WILL BE CONNECTED TO NEW FRAMING PRIOR TO STEE L FABRICATION. IT IS THE CONTRACTOR ’S RESPONSIBILITY TO VERIFY ALL EXISTING DIMENSIONS AND COORDINATE

THESE DIMENSIONS WITH THE STEEL FABRICATOR PRIOR TO STEEL FABRICATION TO ENSURE ARCHITECTURAL AND STRUCTURAL DESIGN CONCEPT. CONTR ACTOR SHALL NOTIFY ARCHITECT AND/OR ENGINEER OF DISCREPANCIES.

4. CONTRACTOR IS TO FURNISH ENGINEER A PROPOSED SEQUEN CE OF EXISTING COMPONENT REMOVAL. METHODS OF SAW CUTTING, TEMPORARY SHORING AND OTHER PERTINENT

TASKS RELATING TO EXISTING COMPONENT REMOVAL IS TO BE SUBMITTED TO THE

ARCHITECT/ENGINEER FOR REVIEW AND TO VERIFY THAT WO RK IS IN GENERAL CONFORMANCE.

3. STRUCTURAL GLUE LAMINATED TIMBER (GLT):

A. GLT FABRICATION SHALL BE PERFORMED IN AN APPROVED F ABRICATORS SHOP IN ACCRODANCE WITH CBC 2303.1.3, ANSI/AITC A190.1 AND ASTM D3737.

B. GLT BEAMS SHALL BE 24F -V8 WITH A CAMBER OF R=1600' UNLESS NOTED OTHERWISE.

C. GLT EXPOSED TO WEATHER SHALL BE RATED FOR EXTERIOR USE BY THE MANUFACTURER. FLASHING AND WATERPROOFING OF THE EX POSED ENDS SHALL BE PROVIDED BY THE CONTRACTOR TO PREVENT DECAY.

D. ALL GLT MEMBERS SHALL HAVE APPEARANCE CLASSIFICATIO N AS SPECIFIED ON THE ARCHITECTURAL DRAWINGS.

4. ALL STRUCTURAL TIMBER FRAMING SHALL HAVE A MAXIMUM MOISTURE CONTENT OF 19% AT

THE TIME OF ENCLOSURE, REGARDLESS OF THE MOISTURE C ONTENT AT THE TIME OF MANUFACTURE. TIMBER FLOOR FRAMING, INCLUDING JOISTS AND BEAMS, WITH MORE THAN 2 FRAMED LEVELS ABOVE THEM SHALL BE DESIGNATED AS ' S -DRY' OR 'MC15' AND HAVE A MAXIMUM MOISTURE CONTENT OF 15% AT THE TIME OF ENCL OSURE.

5. CONTRACTOR SHALL PROVIDE AT LEAST THREE RANDOM MOIS TURE READINGS PERFORMED

AT WALL AND FLOOR FRAMING IN THE PRESENCE OF THE BU ILDING INSPECTOR PRIOR TO

APPROVAL TO ENCLOSURE TO VERIFY IN SERVICE MOISTURE CONTENT TO SATISFY THE REQUIRMENTS ABOVE.

6. ALL LUMBER LOCATED IN DIRECT CONTACT WITH CONCRETE OR MASONRY INCLUDING BUT

NOT LIMITED TO SILL PLATES, NAILERS, AND LEDGERS SH ALL BE PRESSURE TREATED DOUGLAS FIR.

7. ALL HARDWARE SHALL BE SIMPSON STRONG -TIE CO INSTALLED PER MANUFACTURERS RECCOMENDATIONS. SUBSTITUTION OF EQUIVALENT HARDWAR E FROM AN ALTERNATE MANUFACTURER SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL.

8. MINIMUM FASTENING AND NAILING OF TIMBER COMPONENTS SHALL BE IN ACCORDANCE WITH CBC TABLE 2304.10.1.

9. FASTENERS SHALL BE PROVIDED NEW AND WITHOUT EXCESSI VE RUST. ALL FASTENERS EXPOSED TO WEATHER SHALL BE GALVANIZED.

10. ALL METAL FASTENERS IN CONTACT WITH PRESERVATIVE -TREATED LUMBER SHALL BE

STAINLESS STEEL OR OTHERWISE CERTIFIED BY THE MANUF ACTURER TO RESIST CORROSION CAUSED BY THE SPECIFIC TREATMENT APPLIED TO THE WOOD.

11. NAILS:

A. ALL NAILS SHALL BE COMMON WIRE NAILS UNLESS NOTED O THERWISE B. MINIMUM NAIL PENETRATION SHALL BE 10 TIMES THE SHAN K DIAMETER UNLESS NOTED OTHERWISE.

C. EDGE DISTANCES, END DISTANCES, AND FASTENER SPACING S SHALL BE SUFFICIENT TO PREVENT SPLITTING OF THE WOOD.

D. BORED PILOT HOLES SHALL BE PERMITTED FOR ALL NAILS TO HELP PREVENT WOOD FROM SPLITTING. BORED HOLES SHALL BE MANDATORY FOR 20d AND LARGER NAILS.

WHEN UTILIZED BORED HOLES SHALL HAVE A DIAMETER NOT EXCEEDING 75% OF THE NAIL DIAMETER.

E. TOE NAILS SHALL BE DRIVEN AT AN ANGLE OF APPROXIMAT ELY 30 DEGREES WITH THE MEMBER AND STARTED APPROXIMATELY 1/3 THE LENGTH OF THE FASTENER FROM THE MEMBER END.

12. WOOD SCREWS:

A. WOOD SCREWS SHALL MEET THE DIMENSIONAL STANDARDS OF ANSI/ASME B18.6.1.

B. MINIMUM SCREW PENETRATION SHALL BE 10 TIMES THE SCR EW DIAMETER UNLESS NOTED OTHERWISE.

C. EDGE DISTANCES, END DISTANCES, AND FASTENER SPACING S SHALL BE SUFFICIENT TO PREVENT SPLITTING OF THE WOOD.

D. BORED LEAD HOLES SHALL BE PROVIDED WITH A DIAMETER EQUAL TO APPROXIMATELY 7/8 OF THE SCREW ROOT DIAMETER.

E. WOOD SCREWS SHALL BE TURNED, NOT DRIVEN INTO PLACE. SOAP OR OTHER

LUBRICANTS MAY BE PROVIDED TO FACILITATE INSERTION AND TO PREVENT DAMAGE TO THE SCREWS.

13. BOLTS AND LAG SCREWS:

A. BOLTS AND LAG SCREWS SHALL CONFORM TO ASTM A307 AND MEET THE DIMENSIONAL STANDARDS OF ANSI/ASME B18.2.1.

B. HOLES FOR BOLTS SHALL BE A MINIMUM 1/32" TO A MAXIM UM OF 1/16" LARGER THAN THE BOLT DIAMETER.

C. BOLTS SHALL BE ACCURATELY ALIGNED IN MAIN MEMBERS A ND SIDE PLATES. BOLTS SHALL NOT BE FORCIBLY DRIVEN INTO PLACE.

D. BORED LEAD HOLES FOR LAG SCREWS SHALL BE 40 -70% OF THE SHANK DIAMETER AT

THE THREADED PORTION OF THE SCREW, AND THE SAME DIA METER AS THE SHANK AT THE SHANK.

E. LAG SCREWS SHALL BE TURNED, NOT DRIVEN INTO PLACE.

F. ALL BOLTS, NUTS, AND LAG SCREWS SHALL BE PROVIDED W ITH FLAT OR MALLEABLE WASHERS WHERE BEARING AGAINST DIRECTLY AGAINST WOOD .

G. ALL BOLTS AND LAG SCREWS SHALL BE TIGHTENED UPON IN STALLATION AND RE - TIGHTENED BEFORE CLOSING IN OR AT COMPLETION OF JOB .

14. ALL BUILT UP, DOUBLE 2X BEAMS AND JOISTS SHALL BE F ASTENED TOGETHER WITH 2 -ROWS 10d NAILS AT 12" OC.

15. PROVIDE DOUBLE FLOOR JOISTS UNDER PARTITION WALLS R UNNING PARALLEL TO JOIST SPAN.

16. PROVIDE SOLID BLOCKING IN JOIST FRAMING ABOVE ALL S UPPORTS, BELOW PARTITION WALLS, AND AT MIDSPAN OF JOISTS SPANNING GREATER TH AN 10 FEET.

17. SUPPORT ALL UPPER LEVEL POSTS AND TRIMMERS IN LOWER LEVELS WITH EQUIVALENT FRAMING AND/OR BLOCKING OR OTHERWISE FRAME POSTS TH ROUGH FLOOR SYSTEMS.

18. FIRE BLOCK STUD WALLS AT MID -HEIGHT WHERE STUD LENGTH EXCEEDS 10 FEET.

19. NOTCHING OR CUTTING STUDS TO CLEAR ANCHOR BOLTS IS NOT PERMITTED. STUDS SHALL HAVE FULL BEARING ON THE SILL PLATE.

20. LET -IN BRACES SHALL NOT BE USED FOR TEMPORARY BRACING O N ANY WALL FRAME. STEEL

STRAPS WHICH DO NOT REQUIRE THE CUTTING OF STUDS AR E AN ACCEPTABLE ALTERNATIVE.

21. WHERE POSTS ARE SPECIFIED WITH CAPS AND/OR BASES, T HE LOAD SHALL BE TRANSFERRED TO THE FOUNDATION BY VERTICAL GRAIN ONL Y.

22. DO NOT CUT, BORE, COUNTERSINK OR NOTCH WOOD MEMBERS EXCEPT WHERE EXPLICITY SHOWN IN THE DETAILS.

23. HOLDOWNS SHALL BE INSTALLED 1/2" MINIMUM ABOVE THE PLATE TO ALLOW FOR TIGHTENING OF THE ANCHOR BOLT. THE HOLDOWN SHALL BE INSTALLED TIGHT TO THE POST WITHOUT FILLERS. DO NOT BEND HOLDOWN ANCHORS. TIGHT EN ANCHORS PER MANFACTURERS RECOMMENDATIONS PRIOR TO COVERING THE WALL FRAMING.

IV. MECHANICAL AND ADHESIVE ANCHORS

1. ADHESIVE ANCHORS AND DOWELS INSTALLED INTO CONCRETE :

A. "SET -XP ” BY SIMPSON STRONG TIE (ESR#2508)
B. "HIT -RE 500 -SD" BY HILTI, INC. (ESR#2322)
C. "PURE110+BY DEWALT (ESR -3298)

2. ADHESIVE ANCHORS AND DOWELS INSTALLED INTO GROUT -FILLED CMU:

A. "EPOXY SET -TIE SET ” BY SIMPSON STRONG TIE (ESR#1772) B. "HIT HY -270" BY HILTI, INC. (ESR#4143)
C. "AC100+GOLD" BY DEWALT (ESR -3200)

3. ADHESIVE ANCHORS AND DOWELS INSTALLED INTO UNREINFO RCED BRICK MASONRY (URM):

A. "EPOXY SET -TIE SET ” BY SIMPSON STRONG TIE (ESR#1772) B. "HIT HY -270" BY HILTI, INC. (ESR#4143)
C. "AC100+GOLD" BY DEWALT (ESR -4105)

4. EXPANSION ANCHORS INSTALLED INTO CONCRETE OR GROUT -FILLED CMU:

A. "STRONG -BOLT 2" BY SIMPSON STRONG -TIE (ESR#3037)
B. "KWIK BOLT TZ2 ” BY HILTI, INC. (ESR#4266)
C. "POWER -STUD+SD2" BY DEWALT (ESR -2502)
VIII. STRUCTURAL LUMBER

1. ALL STRUCTURAL SAWN LUMBER SHALL BE DOUGLAS FIR LARCH AS GRADED BY THE WWPA OR WCLIB WITH THE FOLLOWING MINIMUM GRADES, UNLESS NOTED OTHERWISE:

A. 2X OR 3X STUDS: NO. 2
B. 4X AND LARGER POSTS OR STUDS: NO. 1
C. 2X OR 3X JOISTS: NO. 2
D. 4X AND LARGER BEAMS OR JOISTS, CONCEALED: NO. 1
E. 4X AND LARGER BEAMS OR JOISTS, EXPOSED: SELECT STRU CTURAL

2. ALL STRUCTURAL COMPOSITE LUMBER (SCL) OR ENGINEERED LUMBER SHALL BE AS FOLLOWS:

A. I-JOISTS: TJI JOISTS MANUFACTURED BY WEYERHAUSER (ESR -1153) B. LSL: TIMBERSTRAND LSL MANUFACTURED BY WEYERHAUSER (ESR -1387) C. LVL: MICROLLAM LVL (2.0E) MANUFACTURED BY WEYERHAUSER (ESR -1387) D. PSL: PARALLAM PSL (2.0E) MANUFACTURED BY WEYERHAUSER (ESR -1387) E. SUBSTITUTION OF PRODUCTS LISTED ABOVE SHALL BE SUBM ITTED TO ENGINEER FOR REVIEW AND APPROVAL.

SLAB STEP/ DEPRESSION

SLOPE UP

SLOPE DOWN
RIDGE
VALLEY

REVISION NUMBER

ELEVATION

SECTION MARK

ELEVATION MARK

GRID BUBBLE
1 0
S301
0 S201

SLAB THICKNESS
CHANGE
DETAIL MARK 0
S501

GENERAL NOTES

OWSJ OPEN WEB STEEL
JOIST

PERP PERPENDICULAR

PJP PARTIAL JOINT

PENETRATION

PL PLATE

PLF POUNDS PER LINEAR
FOOT

PLYWD PLYWOOD

PSF POUNDS PER SQUARE
FOOT

PSI POUNDS PER SQUARE
INCH

R RADIUS

REF REFER, REFERENCE

REINF REINFORCED,

REINFORCEMENT

REM REMAINDER

REQ'D REQUIRED
REQ'MT
S,
REQMTS

REQUIREMENTS

REV REVISION

SAD SEE ARCHITECTURAL

DRAWINGS

SC SLIP CRITICAL

SCHED SCHEDULE

SCJ SAWN CONTROL JOINT

SECT SECTION

SF SQUARE FEET

SHT SHEET

SHT'G SHEATHING

SIM SIMILAR

SOG SLAB ON GRADE

SPA SPACES, SPACING

SQ SQUARE

SSH SHORT SLOTTED HOLE

STD STANDARD

STL STEEL

STRUCT STRUCTURE,

STRUCTURAL

SUPP SUPPORT

T&B TOP AND BOTTOM

TEMP TEMPORARY

THK THICK

TO TOP OF

TOC TOP OF CONCRETE

TOF TOP OF FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOSC TOP OF STRUCTURAL

CONCRETE

TOSL TOP OF SLAB

TOT TOTAL

TOW TOP OF WALL

TYP TYPICAL

UON UNLESS OTHERWISE
NOTED

V, VERT VERTICAL

VIF VERIFY IN FIELD

W WIDE FLANGE

W/ WITH

W/O WITHOUT

WB WIND BRACE

WBBP WIND BRACE

BASEPLATE

WHSS WELDED HEADED

STEEL STUD

WP WORKING POINT,

WORK POINT

WRT WITH RESPECT TO

WT WEIGHT

WWF WELDED-WIRE FABRIC

YD YARD

ES EACH SIDE

EW EACH WAY
EXIST,
(E)

EXISTING

EXT EXTERIOR

FD FLOOR DRAIN
FDN,
FNDN

FOUNDATION

FF EL FINISH FLOOR

ELEVATION

FN FIELD NAILING

FOA FACE OF ANGLE

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FT FEET

FTG FOOTING
Fy YIELD STRESS

GA GAGE, GUAGE

GALV GALVANIZED

GB GRADE BEAM

GLB GLUED-LAMINATED
BEAM

GT GIRDER TRUSS

H, HORIZ HORIZONTAL

HC HOLLOW CORE

HI HIGH

HK HOOK

HSS HOLLOW STRUCTURAL
STEEL

IN INCHES

INFO INFORMATION

INT INTERIOR

JST JOIST

JT JOINT
K KIPS

KB KNEE BRACE

L ANGLE

LB POUND

LF LINEAR FOOT

LG LENGTH

LLBB LONG LEG BACK TO
BACK

LLH LONG LEG

HORIZONTAL

LLV LONG LEG VERTICAL
LO LOW

LT WT LIGHTWEIGHT

LVL LEVEL

MAX MAXIMUM

MC MOMENT CONNECTION

MCJ MASONRY CONTROL
JOINT

MECH MECHANICAL

MEZZ MEZZANINE
MFR,
MANUF

MANUFACTURER

MID MIDDLE

MIL MILLIMETER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

N NORTH

NA NOT APPLICABLE

NDT NON-DESTRUCTIVE

TESTING

NEW, (N) NEW

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE
# POUND
& AND
@ AT

AB ANCHOR BOLT

ACS ALL COMMON SIDES

ADDL ADDITIONAL

AESS ARCHITECTURALLY

EXPOSED

STRUCTURAL STEEL

ALT ALTERNATE
ARCH,
ARCH'L

ARCHITECT,

ARCHITECTURAL

BL BRICKLEDGE

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BN BOUNDARY NAILING

BO BOTTOM OF

BOB BOTTOM OF BEAM

BOD BOTTOM OF DECK

BOS BOTTOM OF STEEL
BOT,
BOTT
BOTTOM

BP BASE PLATE

BRBF BUCKLING

RESTRAINED BRACED
FRAME

BRG BEARING

BTWN BETWEEN

C CHANNEL

CB CONCRETE BEAM

CC CARRIED COLUMN

CEN CENTER

CFMF COLD-FORMED METAL

FRAMING

CIP CAST IN PLACE

CJ CONTROL JOINT

CJP COMPLETE JOINT

PENETRATION

CL CENTERLINE

CLR CLEAR

CMU CONCRETE MASONRY
UNIT

COL COLUMN

CONC CONCRETE

CONN CONNECT,

CONNECTION

CONT CONTINUOUS

CTR CENTERED

CWI CERTIFIED WELDING

INSPECTOR

D, DIA DIAMETER

DBA DEFORMED BAR
ANCHOR

DBL DOUBLE

DEF DEFORMED,

DEFINITION

DEFL DEFLECTION
DET,
DTL
DETAIL

DIAG DIAGONAL

DN DOWN

DWG DRAWING

EA EACH

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

EN EDGE NAILING

EOR ENGINEER OF RECORD

EOS EDGE OF SLAB

EQ EQUAL

EQ SPA EQUAL SPACE

ABBREVIATIONS

SYMBOLS
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 11:18:36 AM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

GENERAL NOTES

OFFICE LEGAL ENTITY
523 West 6th Street Suite 1200
OFFICE ADDRESS LINE 2
Los Angeles, CA 90014-1218
Tel: (213) 955-9775 • www.stantec.com
MM AF AF 17.09.28
2014226900
S-001

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 (E) W14x34
(E) BF
(E) W14x34
(E) 3 1/2x11 7/8 PSL
(E) 11 7/8" TJI L65 JOIST
@ 16" O.C., TYP.
5 1/4"x14 PSL
(E) 3 1/2x11 7/8 PSL
(E) DBL. JOIST
@ MECH
EQUIP
(E) 4x8
(E) 4x8
(E) 4x8
(E) 5 1/4x18
PSL
(E)2x8
(E) DBL JOIST
(E) 3 1/2x11 7/8 PSL
(E) 3 1/2x
11 7/8 PSL
(E) 3 1/2x11 7/8 PSL
NEW RTU -1 WT. = 1500 LBS
PER MEP DRAWING.

SEE 2/S -201 FOR
ANCHORAGE DETAIL.
(N) 4X8 ALONG THE ROOF
CURB PERIMETER, TYP.

SEE 2/S -201 FOR DETAIL.
(E)11 7/8" TJI L65 JOIST,
V.I.F.
(N) OPENING PER MEP DRAWING.

SEE 3/S -201 FOR DETAIL.
(E) 11 7/8" TJI L65 JOIST
@ 16" O.C.
(E) 11 7/8" TJI
L65 @ 16" O.C.

PREFABRICATED ROOF
CURB BY MANUF.
(N) RTU PER PLAN

RIGID INSULATION
(BY MANUF.)
1/4" DIA x 5" LONG LAG SCREWS @ 12" OC MAX AND
3" FROM ENDS ALONG THE PERIMETER OF THE CURB.
(8) LAG SCREWS MIN. IN EACH LONG SIDE AND (5) LAG
SCREWS MIN. IN EACH SHORT SIDE.

SIMPSON 'IUS'

CONNECTOR
1"x2 -5/16" PS1 OR PS2 (FACE
GRAIN VERTICAL) FILLER BLK.

AT EACH SIDE W/ (3) 8d
(N) 4x8 BLOCKING
(E) TJI JOIST (SEE PLAN)

WHERE OCCURS
(E) PLYWOOD
32" MAX.
5' - 0" MAX.
8d @ 4" O.C. EDGE NAILING
CS16 STRAP
2x BLOCKING UNDER STRAP
FILED VERIFY (E) MEMBER.

PROVIDE JOIST HANGER
PER TABLE, TYP.
(E) JOIST PER PLAN
TWO BAY MIN.

NOTE:

1. CONTACT EOR IF OPENING IS LARGER THAN THE OPENIN G SIZE INDICATED IN THIS DETAIL.

2. (N) 4X12 CAN BE OMITTED IF (E) JOISTS OCCURS ADJ ACENT TO THE OPENING. (N) 4X12, SEE NOTE 2
(N) 4X12, SEE NOTE 2
(N) 4X12, SEE NOTE 2
(N) 4X12, SEE NOTE 2

CONNECTING MEMBER TOP MOUNT FACE MOUNT
TJI "I" (SKEWED / SLOPED)
(2) TJI "I" (SKEWED / SLOPED)
2x
( 2 ) 2x
( 3 ) 2x
3x OR GREATER
GLB ( SMALLER THAN 7 1/2)
PSL
2x SLOPED
LBV: USE WITH WEB STIFFENER AT JOIST END
HGUS: NO SKEWED AND SLOED

ITT ( LBV )

LBV ( LBV )
JB
WNP
HU -TF
WM
GLTV
GLTV
LBV

IUS ( U )

U ( U )
U
HU -2
HU -3
HU
HGUS

HGUS OR HHUS

OR HUCQ
LSSU
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/28/2022 1:12:56 PM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

PARTIAL (E) ROOF FRAMING PLAN

OFFICE LEGAL ENTITY
523 West 6th Street Suite 1200
OFFICE ADDRESS LINE 2
Los Angeles, CA 90014-1218
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/22/21
2014226900
S-201
1/4" = 1'-0" S-201
1 (E) ROOF FRAMING PLAN
NTS S-201
2 NEW RTU ANCHORAGE DETAIL
NTS S-201
3 (N) OPENING ON (E) ROOF
NTS S-201
4 HANGER TABLE

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
C.G. WT. =
212 LBS
VARIES 19" TO 46"
EQ EQ

8.15"
5" OR
EQ EQ
16"

7.2" OR 9.149"
(4) #14 SMS
5" OR 8.15"

TRACK BACKING PL PER
1/S -701, T&B. EXTEND

BACKING ONE STUD

BEYOND THE END ANCHOR
POTINT. (2) STUDS MIN.
(E) 5/8" GYP
BOARD
6"
C.G. WT. =
212 LBS MAX

MOUNTING BRACKET
BY MFR

PLAN AT WALL PLATE SIDE VIEW
(E) WALL STUD 18GA MIN.

NOTES:

1. INFORM SEOR BEFORE INSTALLATION IF ONE OF THE FO LLOWINGS OCCURS:
a. THE TOTAL WEIGHT INCLUDING THE MONITOR AND THE B RACKET OVER THE MAX WEIGHT. b. THE ANCHOR SPACING SMALLER THAN THE SPECIFIED SP ACING. (2) #10 SCREWS

EACH STUD
6" x 16 GA TAUT

FLAT STRAP

FRAMED WALL, SEE

PLAN FOR SIZE &

SPACING
FINISH

SURFACE
NOTES:

1. STRAP AND/OR TRACK TO EXTEND OVER (3) STUDS MIN IMUM.

2. FLAT STRAP BACKING TO BE USED FOR COMPONENT LOA DS OF MAXIMUM 20 PLF OR 50 LB POINT LOAD AT CENTER.

3. TRACK BACKING TO BE USED FOR COMPONENT LOADS OF MAXIMUM 50 PLF OR 250 LB POINT LOAD AT CENTER.

FLAT STRAP BACKING
METAL

STUD, TYP
600T150 -54 UNPUNCHED

CONTINUOUS TRACK,

CLIP FLANGES AT EA STUD
(4) #10 SCREWS AT EACH STUD

TRACK BACKING VERTICAL TRACK BACKING
600T150 -54 UNPUNCHED

CONTINUOUS TRACK,

CLIP FLANGES AT EA STUD
(4) #10 SCREWS AT

EACH STUD
600T150 -54 UNPUNCHED

CONTINUOUS VERTICAL

TRACK, CLIP FLANGES AT EA
END
(4) #10 SCREWS

VERTICAL TRACK TO

HORIZONTAL TRACK

VERTICAL TRACK BACKING - ALTERNATE
6" x 16 GA 1 -1/2" FLANGE

METAL TRACK ATTACHED TO
STUDS W/ #10 SMS @ 1" OC
2' -0" MIN
NTS S-701
2 MONITOR ANCHORAGE DETAIL
NTS S-701
1 BACKING SUPPORT
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/28/2022 1:12:56 PM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

EQUIPMENT ANCHORAGE

OFFICE LEGAL ENTITY
523 West 6th Street Suite 1200
OFFICE ADDRESS LINE 2
Los Angeles, CA 90014-1218
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/27/21
2014226900
S-701

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

GRAPHIC LEGEND

COLUMN GRID LINE

ELEVATION

ELEVATION NUMBER

SHEET WHERE IT IS SHOWN

EXTERIOR

BUILDING SECTION

SECTION NUMBER

SHEET WHERE IT IS SHOWN

WALL SECTION

SECTION NUMBER

SHEET WHERE IT IS SHOWN

DETAIL CALLOUT

DETAIL NUMBER

SHEET WHERE IT IS
SHOWN

NORTH ARROW
1t
101
A1
A-101
A1
A-101
A1
A-101
A1
A-101
A1
A-101
A1
A-101

INTERIOR

ROOM TAG

DOOR TAG

PARTION/WALL TYPE

FINISH TAG

KEYNOTE
1i WINDOW/LOUVER TYPE
1 REVISION
XX

ROOM NAME
A101

GLAZING AND

TRANSLUCENT PANEL

SYSTEM TAG
SF - 1
?
?
N
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

ABBREVIATIONS & ARCHITECTURAL

GENERAL NOTES
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-001

ABBREVIATIONS

SB SPLASH BLOCK

SCHED SCHEDULE / SCHEDULED

SCHEM SCHEMATIC

SCP SCUPPER

SCWD SOLID CORE WOOD DOOR

SEC SECOND

SECT SECTION

SF SQUARE FOOT / SQUARE FEET / SUPPLY FAN

SGL SINGLE

SHT SHEET

SHT MTL FLASH SHEET METAL FLASHING

SHTHG SHEATHING

SIM SIMILAR

SLNT SEALANT

SM SHEET METAL / SMALL / SURFACE MOUNTED

SMACNA SHEET METAL AIR CONDITIONING CONTRACTOR'S NAT IONAL

ASSOCIATION

SPEC SPECIFICATION(S)

SPLY SUPPLY

SPRT SUPPORT

SQ SQUARE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STL JST STEEL JOIST

STOR STORAGE

STRUCT STRUCTURAL

SURF SURFACE

SUSP SUSPENDED

SYMM SYMMETRICAL

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TEL TELEPHONE

TEMP TEMPERATURE / TEMPORARY

TERR TERRAZZO

THK THICK / THICKNESS

THRES THRESHOLD

THRU THROUGH

TMPD GL TEMPERED GLASS
TO TOP OF ____

TOC TOP OF CONCRETE / TOP OF CURB

TOJ TOP OF JOIST

TOM TOP OF MASONRY

TOP TOP OF PARAPET / TOP OF PAVEMENT

TOS TOP OF STEEL / TOP OF SLAB

TOW TOP OF WALL

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UBC UNIFORM BUILDING CODE

UC UNDERCUT

UL UNDERWRITER'S LABORATORIES

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UR URINAL

UTIL UTILITY

VAR VARIES

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VNR VENEER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST / WIDTH / WIDE

W/ WITH

W/O WITHOUT

WBL WOOD BLOCKING

WC WATER CLOSET / WALL COVERING

WD WOOD / WOOD DOOR

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER / WEEP HOLE

WP WATERPROOFING / WORKING POINT

WR WATER RESISTANT / WEATHER RESISTANT

WT WEIGHT

WWF WELDED WIRE FABRIC

YD YARD / YARDS

ABBREVIATIONS

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MFG MANUFACTURING

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

ML METAL LATH

MO MASONRY OPENING

MOD BIT MODIFIED BITUMEN

MR MOISTURE RESISTANT

MS MOP SINK

MTD MOUNTED

MTL METAL

MULL MULLION

N NORTH

N/A NOT APPLICABLE

NCOMBL NONCOMBUSTIBLE

NEG NEGATIVE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O/O OUT TO OUT

OA OVERALL / OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER / OUTSIDE DIMENSION

OF OUTSIDE FACE

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED/OWNER INSTALLED

OFF OFFICE

OH OPPOSITE HAND / OVERHEAD / OVERHANG

OPNG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

ORN ORNAMENTAL

ORS OVERFLOW ROOF SCUPPER

PAT PATTERN

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PERF PERFORATED

PERM PERMANENT

PL PLATE / PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER / PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

POL POLISHED

PR PAIR / PIPE RAIL

PREFAB PREFABRICATED

PREFIN PREFINISHED

PRELIM PRELIMINARY

PREP PREPARATION

PROJ PROJECT

PT PAINT / PRESSURE TREATED

PT CONC POST TENSION CONCRETE

PTD PAINTED / PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

QT QUARRY TILE

QTY QUANTITY

R RADIUS / RISER

RA RETURN AIR

RB RUBBER BASE / RESILIENT BASE

RBR RUBBER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REBAR REINFORCED STEEL BAR

REC RECESSED

REF REFERENCE / REFRIGERATOR

REINF REINFORCED / REINFORCEMENT

REM REMOVE

REQD REQUIRED

REV REVISION

RGD INS RIGID INSULATION

RH RIGHT HAND

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RP REFERENCE POINT

RTG RATING

RTU ROOF TOP UNIT

RVL REVEAL

S SOUTH

SALV SALVAGE

SAN SANITARY

ABBREVIATIONS

EL EASEMENT LINE

ELEC ELECTRIC / ELECTRICAL

ELEV ELEVATOR / ELEVATION

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER / ENGINEERING

EOS EDGE OF SLAB

EPDM ETHYLENE PROPYLENE DIENE MONOMOR

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EST ESTIMATE

ETC ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPOSED / EXPAND / EXPANSION

EXT EXTERIOR / EXTERNAL / EXTINGUISHER

F / F FACE TO FACE

F F EL FINISHED FLOOR ELEVATION

FA FIRE ALARM / FACE AREA / FRESH AREA

FACP FIRE ALARM CONTROL PANEL

FD FLOOR DRAIN

FDTN FOUNDATION

FDV FIRE DEPARTMENT VALVE CABINET

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF INSUL FOIL BACKED INSULATION

FFE FINISHED FLOOR ELEVATION

FH FIRE HYDRANT / FIRE HOSE

FHC FIRE HOSE CABINET

FIN FINISH

FIN GR FINISHED GRADE

FIXT FIXTURE

FL FLOW LINE / FLOOR LINE

FLR FLOOR / FLOORING

FLUOR FLUORESCENT

FR FRAME / FIRE RATED / FIRE RETARTANT

FT FOOT / FEET / FIRE TREATED / FULLY TEMPERED

FTG FOOTING

FURG FURRING

FURN FURNISH / FURNITURE

FUT FUTURE

FVC FIRE VALVE CABINET

GA GAGE

GAL GALLONS

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERAL / GENERATOR

GI GALVANIZED IRON

GL GLASS / GROUND LEVEL

GLZ GLAZING

GND GROUND

GYP BD GYPSUM BOARD
GYP SHTG GYPSUM SHEATHING BOARD.

HC HANDICAPPED ACCESSIBLE / HOLLOW CORE

HD HEAD / HEAVY DUTY

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT / HORSEPOWER / HIGH PRESSURE

HT HEIGHT

HVAC HEATING VENTILATION AND AIR CONDITIONING

HW HOT WATER

HWH HOT WATER HEATER

ID INSIDE DIAMETER / INTERIOR DESIGN

IF INSIDE FACE / INTAKE FAN

IN INCHES

INCAND INCANDESCENT

INCL INCLUDING

INSTL INSTALL

INSUL INSULATE / INSULATION

INT INTERIOR / INTERNAL

INV INVERT

INV EL INVERT ELEVATION

J BOX JUNCTION BOX

JAN JANITOR

JAN CLO JANITOR CLOSET

JT JOINT

KIT KITCHEN

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUNDS

LF LINEAR FEET

LH LEFT HAND

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LPT LOW POINT

LT LIGHT

LTG LIGHTING

LVR LOUVER

MAINT MAINTENANCE

ABBREVIATIONS

AB ANCHOR BOLT

ACT ACOUSTICAL TILE

ADJ ADJACENT/ADJUSTABLE

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AHU AIR HANDLING UNIT
ALT ALTERNATE NO.

ALUM ALUMINUM

ANOD ANODIZED

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPD APPROVED

APPROX APPROXIMATELY

ARCH ARCHITECT

ASSY ASSEMBLY

AUTO AUTOMATIC/AUTOMATION

AVG AVERAGE

AWI AMERICAN WOODWORKING INSTITUTE

AWT ACCOUSTICAL WALL TREATMENT

B/B BACK TO BACK

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLST BALLAST

BM BEAM/BENCH MARK
BO BOTTOM OF ____

BOD BASIS OF DESIGN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRG BEARING

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

C / C CENTER TO CENTER

CAB CABINET

CB CATCH BASIN

CBB CEMEMTITOUS BACKER BOARD

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CUBIC FOOT / FEET

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFF COLD FORMED FRAMING

CFLG COUNTER FLASHING

CG CORNER GUARD

CIP CAST IN PLACE

CJ CONTROL JOINT / CONTRACTION JOINT

CL CENTERLINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CLT CLEAT

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

COND CONDITION

CONST CONSTRUCTION

CONT CONTINUE / CONTINUATION / CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COP COPING

CORR CORRIDOR

CPT CARPET

CSK COUNTER SUNK

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FOOT / CUBIC FEET

CU YD CUBIC YARDS

CW COLD WATER

D DEPTH / DEEP

DBL DOUBLE

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DET DETAIL

DETN DETENTION

DEV DEVELOPED

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DMPF DAMPPROOFING

DN DOWN

DR DOOR / DRAIN

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING
E EAST

EA EACH

EIFS EXTERIOR INSULATION FINISH SYSTEM

EJ EXPANSION JOINT

EL REFERENCE ELEVATION

GENERAL NOTES
1 THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS AND ARE NOT SPECIFIC TO ANY ONE DISCIPLINE.
2 IT IS THE CONTRACTORS RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL

SUB-CONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT BEFORE

COMMENCING CONSTRUCTION, AND ASSURE THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS,

REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT PARTY.
3 THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE AND MAY REQUIRE CROSS REFERENCE. PARTIAL

SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE DISTRIBUTED OR UTILIZED BY THE CONTRACTOR.
4 THE DRAWINGS AND SPECIFICATIONS ESTABLISH MINIMUM REQUIREMENTS FOR THE DESIGN AND CONSTRUCTION OF THE PROJECT.
5 ARCHITECT IS NOT RESPONSIBLE FOR ACCURACY OF EXISTING CONDITIONS SHOWN IN THESE DOCUMENTS. GC SHALL CONTACT ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES OCCUR IN THE FIELD.
6 THE DRAWINGS IN THIS SET ARE DIAGRAMMATIC AND ILLUSTRATE THE INTENT OF THE DESIGN. 7 THE CONTRACTOR SHALL IDENTIFY AND NOTIFY IN WRITING TO THE ARCHITECT CONFLICTS BETWEEN

THE WORK OF DIFFERENT PARTIES, AND DISCREPANCIES BETWEEN THE DOCUMENTS AND THE ACTUAL

CONDITIONS AT THE EARLIEST POSSIBLE DATE SO AS TO ALLOW REASONABLE AND ADEQUATE TIME FOR THE CONFLICT TO BE RESOLVED WITHOUT DELAYING THE WORK. ALL DEVIATIONS FROM THAT WHICH IS

REQUIRED BY THE CONTRACT DOCUMENTS MUST BE APPROVED IN ADVANCE BY THE ARCHITECT AND OWNER PRIOR TO PROCEEDING.
8 THE GENERAL NOTES, SYMBOLS AND DEFINITIONS APPLICABLE TO EACH DISCIPLINE CAN BE FOUND AT THE FRONT OF EACH DISCIPLINE’S SET OF DRAWINGS AND IS LISTED AS PART OF THE OVERALL PROJECT INDEX OF DRAWINGS.
9 BASIC FIRE PROTECTION AND EXITING CONCEPTS ARE ILLUSTRATED BY THE LIFE SAFETY AND CODE PLANS ON THE ‘G’ SERIES SHEETS. THE CONTRACTOR SHALL BE FAMILIAR WITH REQUIREMENTS AND

CONSTRUCTION SHALL BE IN COMPLIANCE WITH REFERENCED FIRE RATED ASSEMBLY TESTS AND STANDARDS.
10 THE ARCHITECTURAL DRAWINGS ESTABLISH, COORDINATE, AS WELL AS TAKE PRECEDENCE FOR THE

FINISHED APPEARANCE AND EXACT LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK OF ALL

TRADES, INCLUDING THAT WORK WHICH IS ILLUSTRATED PRIMARILY ON DRAWINGS OF OTHER DISCIPLINES.
11 THE DRAWINGS MAY MAKE REFERENCE TO AND/OR ILLUSTRATE ITEMS WHICH ARE NOT PART OF THE WORK OF THE CONTRACT. THESE ‘NOT IN CONTRACT’ ITEMS AS INDICATED ARE REFERENCED AND/OR ILLUSTRATED FOR THE CONTRACTORS REFERENCE, INFORMATION AND COORDINATION ONLY. 12 THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL APPLICABLE LAWS, CODES, REGULATIONS AND ORDINANCES OF THE PLACE (CITY, COUNTY, DISTRICT, AND STATE) WHERE THE PROJECT IS LOCATED. 13 THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND SIMILAR RELEASES REQUIRED FOR THE CONSTRUCTION AND OCCUPANCY OF THE PROJECT. THE CONTRACTOR SHALL FURNISH COPIES OF ALL SUCH ITEMS TO THE OWNER AND ARCHITECT WITHIN 10 DAYS OF RECEIPT OF SUCH ITEMS. IF PERMITS

ARE ISSUED SUBJECT TO CERTAIN CONDITIONS OR REVISIONS TO THE WORK OR IF PERMITS ARE

DELAYED FOR ANY REASON, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND ARCHITECT.
14 THE CONTRACTOR SHALL COORDINATE AND OBTAIN ALL REQUIRED INSPECTIONS OF WORK, INCLUDING THAT PERFORMED BY OWNER. CONTRACTOR SHALL REGULARLY UPDATE OWNER AND ARCHITECT REGARDING THE STATUS OF INSPECTIONS.
15 THE CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN AND PROTECT NEW WORK AS WELL AS EXISTING SYSTEMS AND ELEMENTS WHICH ARE TO REMAIN. ANY DAMAGE TO SUCH SYSTEMS AND ELEMENTS SHALL BE IMMEDIATELY REPAIRED IN A MANNER ACCEPTABLE TO THE ARCHITECT. IF

SATISFACTORY REPAIRS CANNOT BE MADE, THE CONTRACTOR SHALL REPLACE SYSTEMS AND ELEMENTS WITH NEW PRODUCTS ACCEPTABLE TO THE ARCHITECT. ALL REPAIRS AND REPLACEMENT COSTS SHALL BE THE FINANCIAL RESPONSIBILITY OF THE CONTRACTOR.
16 THE CONTRACTOR SHALL COORDINATE ALL WORK WITH APPLICABLE UTILITY PROVIDERS. 17 THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL CHASE SIZES WITH MECHANICAL SUB-CONTRACTOR AND NOTIFY ARCHITECT WITH DISCREPANCIES IN THE FIELD. 18 THE DRAWINGS SHALL NOT BE REPRODUCED FOR SUBMITTALS. DRAWINGS OR PORTIONS THEREOF USED

FOR SUBMITTALS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR WITHOUT THE APPROVAL OF THE ARCHITECT.
19 THE CONTRACTOR SHALL PROVIDE AND COORDINATE ALL BLOCK-OUTS, SLEEVES, INSERTS, BOLTS, PLATES, ETC. FOR ALL TRADES PRIOR TO PLACING CONCRETE OR MASONRY. 20 THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MEANS, METHODS AND SEQUENCES OF CONSTRUCTION.
21 THE CONTRACTOR SHALL PROMPTLY REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION AND DEMOLITION DEBRIS. THE CONTRACTOR SHALL OBTAIN APPROVAL OF OWNER FOR DETAILS RELATED TO ALL SITE ACCESS AND REMOVAL PLANS.
22 THE CONTRACTOR SHALL BECOME FAMILIAR WITH AND COMPLY WITH OWNER’S PROCEDURES FOR MAINTAINING A SECURE SITE AND BUILDING.
23 EACH INSTALLER SHALL EXAMINE THE SUBSTRATE CONDITION AND/OR SITE CONDITIONS WHICH AFFECT THE QUALITY OF EACH PRODUCT TO BE INSTALLED. IF ANY CONDITIONS EXIST WHICH WILL HAVE A

DETRIMENTAL EFFECT ON THE QUALITY OF THE INSTALLATION, THE INSTALLER SHALL IMMEDIATELY ADVISE THE CONTRACTOR. INSTALLATION SHALL NOT PROCEED UNTIL THE UNSATISFACTORY CONDITIONS ARE CORRECTED. INSTALLATION OF PRODUCTS SHALL SIGNIFY ACCEPTANCE BY THE INSTALLER OF THE SUBSTRATE CONDITIONS.
24 THE CONTRACTOR SHALL MAINTAIN A CURRENT/UPDATED RECORD OF DRAWINGS ON SITE AT ALL TIMES. 25 FOR THE PURPOSE OF PRICING/ESTIMATES, WHEN THERE IS A CONFLICT/DISCREPANCY IN THE DRAWINGS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL PRICE THE HIGHER COST ITEM. 26 CONTRACTOR AND SUBCONTRACTOR SHALL NOT SCALE CONSTRUCTION DOCUMENTS. 27 ALL FINISH MATERIALS SHALL CONFORM TO C.B.C. FOR FLAME SPREAD AND SMOKE DEVELOPMENT, REFER TO SPECIFIC MATERIAL SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS. 28 THE CONTRACTOR SHALL COORDINATE INFORMATION THAT IS PART OF ONE OR MORE SEPARATE BID PACKAGES WITH ADDITIONAL INFORMATION ISSUED IN THE BID PACKAGE. THE MULTIPLE BID PACKAGES SHALL CONSTITUTE A COMPLETE PROJECT.
29 THE CONTRACTOR SHALL COORDINATE ALL LOCATIONS AND SIZES OF HOUSEKEEPING PADS WITH MECHANICAL AND ELECTRICAL, PLUMBING, AND EQUIPMENT SUB-CONTRACTORS. 30 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A DUST BARRIERS AS NEEDED THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL REVIEW THE PLACEMENT OF NECESSARY DUST BARRIERS WITH THE OWNER.
31 THE CONTRACTOR IS RESPONSIBLE TO COORDINATE THE SHOP DRAWINGS BETWEEN DIFFERENT

DISCIPLINES
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

AREA OF WORK

EXIST ADMINISTRATION BUILDING

BUS PARKING

EMPLOYEE

PARKING

VISITOR

PARKING

ACCESSIBLE

PARKING

ACCESSIBLE

PARKING

ACCESSIBLE

PARKING

VISITOR

PARKING
GATE

WESTERN AVE
139TH ST
1 SITE PLAN LEGEND

ACCESSIBLE PATH OF TRAVEL
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
1" = 20'-0"
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

SITE PLAN (AREA OF WORK)
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-100
1" = 20'-0" A-100
1 ARCHITECTURAL SITE PLAN
1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D

DISPATCH
1 INTERVIEW
5 HALLWAY
15 (EXIST) AV
EQUIP
29 (EXIST) MEN
QUIET
25 (EXIST)

UNIFORM
23 (EXIST) MENS

RESTROOM
SHOWER
22 (EXIST)

DRIVER'S ROOM
20 SUPERVISORS
7 STANDBY
2 VESTIBULE
3 COFFEE BAR
(EXIST) OPS

MANAGER
3 (EXIST)

TRAINING ROOM
30 (EXIST) ELEC
28 (EXIST) MENS

RESTROOM
27 (EXIST) KITCHEN
21 PARA TRANSIT
4 A-201 3 2
SF-1
SF-2 5B
7 20
2 A-201 8
11 A-201
1 W1
5A
4B
4A
3A
W2
4' - 10"
10' - 8 1/2" 7' - 10" 7' - 6"
7' - 6" 5' - 8 3/4"
8' - 5" 11' - 3 1/2"
6' - 11" 7' - 7"
5' - 0"
8' - 8"
E
(EXIST) COMP

SRV DATA COM
70 W4
5 6
77 TYP
1 3B
6' - 11"
2' - 3 1/2"
3' - 0"
F025
11 13
14 1
W3
15 15
15 1
16 VIF
APPROX 6' - 9"
17 3
2 A
C
B
1 D
2 10' - 0"
10' - 0"
9' - 0"
10' - 0"
3 4 4
E
2 TYP
8 TYP
8 9 9
10 13' - 6"
9' - 0"
9' - 0"
9' - 0"
TYP
12 A-602
10 _________________
A-602
10 _________________
A-602
11 _________________
EQ EQ
2 A
C
B
1 D

NEW WALKING PADS

AROUND THE NEW HVAC

UNIT, AS NEEDED

NEW HVAC UNIT
18 18

RCP LEGEND
ACT -1

SUSPENDED LINEAR LED (DOWN)

RECESSED DOWNLIGHT
RECESSED 2x2 LED

ILLUMINATED EXIT SIGN
ACT -2

TO MATCH

EXISTING
GB
RECESSED 2x4 LED

MECHANICAL AIR

DISTRIBUTION - RETURN

MECHANICAL AIR

DISTRIBUTION - SUPPLY

ROOF NOTES

SEE MECHANICAL AND STRUCTURAL DRAWINGS FOR HVAC UNIT ROOF CURB INFO.

CONTRACTOR TO SUBMIT A LETTER FROM ROOF MEMBRANE

MANUFACTURER'S REPRESENTATIVE THAT ROOFING CONTRACTOR IS

ACCEPTABLE TO DO THE ROOF PATCHING WORK AND MAINTAIN THE

EXISTING ROOFING WARRANTY

CONTRACTOR TO EXAMINE/TEST DECK SUBSTRATE CONDITIONS AND FINISHES PRIOR TO DOING WORK.

CONTRACTOR TO PROVIDE PRODUCT DATA & SHOP DRAWING SUBMITTALS FOR THE ARCHITECT AND OWNER'S REVIEW.

CONTRACTOR TO PROVIDE AUXILIARY ROOFING MATERIALS AS
RECOMMENDED BY ROOF MEMBRANE MANUFACTURER. ADHESIVE AND SEALANTS TO COMPLY WITH VOC LIMITS OF GREEN BUILDING CODE.

CONTRACTOR TO INSTALL ROOFING SYSTEM ACCORDING TO ROOFING SYSTEM MANUFACTURER'S WRITTEN INSTRUCTIONS.
a
b
c
d
e
f
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
1/8" = 1'-0"
3 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

FLOOR PLAN - RCP - ROOF PLAN
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-101
1/8" = 1'-0" A-101
1 GROUND FLOOR PLAN
1/8" = 1'-0" A-101
2 RCP
1/8" = 1'-0" A-101
3 ROOF PLAN

GENERAL NOTES

M CONTRACTOR SHALL PROVIDE APPROPRIATE BLOCKING AND FRAMING FOR ALL CEILING

MOUNTED EQUIPMENT, INCLUDING BUT NOT LIMITED TO MECHANICAL GRILLES, DIFFUSERS, ELECTRICAL FIXTURES, SPRINKLER SYSTEMS AND ACCESS DOORS/PANELS.

N REINSTALL ALL EXISTING CEILING MOUNTED DEVICES UNO , INCLUDING BUT NOT LIMITED

TO SECURITY CAMERAS, SMOKE DETECTORS, ALARMS, COMMUNICATION DEVICES, RECEPTACLES, JUNCTION BOXES, ETC.

O EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED WITH 5-FOOT-CANDLES. EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES AND WILL BE

CONNECTED TO THE BUILDING POWER AND AN EMERGENCY POWER SOURCE PROVIDING 90 MINUTES OF ILLUMINATION IN CASE OF PRIMARY POWER LOSS.

P FIELD VERIFY THE EXISTING MECHANICAL HOT WATER PIP ING ROUTING AND DEMO EXISTING CEILING AS NEEDED FOR ACCESS. PATCH AND PAINT THE EXISTING CEILING.

R REFER TO A-701 FOR LOCATION AND ELEVATIONS OF THE MONITORS (OF/OI)

S CONTRACTOR SHALL PROVIDE APPROPRIATE BACKING FOR A LL WALL MOUNTED MONITORS, PANELS, ETC.

T REFER TO A-701 FOR LOCATIONS OF MONITORS

U REMOVE AND RE-INSTALL EXISTING ROOM SIGNS

GENERAL NOTES

A DO NOT SCALE DRAWINGS
B REFER TO A-611 FOR DOOR & WINDOW SCHEDULE
B REFER TO A-601 FOR PARTITION TYPES, ALL INTERIOR P ARTITIONS ARE A092 U.N.O.

D REFER TO A-701FOR INTERIOR FINISH SCHEDULE AND LEG END

E PRIOR TO STARTING WORK, THE CONTRACTOR SHALL VERIF Y ALL EXISTING CONDITIONS AND DIMENSIONS ON SITE AND NOTIFY G-TRANS OF ANY DISCREPANCIES IN WRITING.

F ALL MATERIALS AND FINISHES ARE TO COMPLY WITH CURR ENT CALGREEN VOC AND MATERIAL REQUIREMENTS.

J REFER TO GENERAL NOTES OF AD-01 FOR CORING AND PAT CHING OF FLOORS.

K LIGHTS ARE SHOWN FOR REFERENCE ONLY. REFER TO ELEC TRICAL DRAWINGS FOR SPECIFICATION INFORMATION. NEW LIGHTING LOCATIONS TAKE PRECEDENCE OVER ALL OTHER CEILING MOUNTED ITEMS. G.C. SHALL COORDINATE ANY DISCREPANCIES WITH G-TRANS AND ARCHITECT PRIOR TO INSTALLATION.

L INSTALL SPRINKLER HEADS AND DOWNLIGHTS AT CENTER O F GYPSUM BOARD CEILING, U.N.O. CONTRACTOR SHALL MARK ALL LIGHT FIXTURE LOCATIONS AND OBTAIN REVIEW FROM G-TRANS AND ARCHITECT IN THE FIELD PRIOR TO INSTALLATION.

KEYNOTES
11 RELOCATED EXISTING MAILBOX KEY PANEL, EXACT LOCATION TBD BY GTRANS
12 NEW 2'x2' ACT CEILING
13 BULLETIN BOARD, 4'X 4', OF/OI
14 WHITE BOARD, OF/OI
15 TIME DISPLAY, WALL MOUNTED, OF/OI
16 NEW DOOR AND FRAME, SEE DOOR SCHEDULE
17 EXISTING MAIL BOXES RELOCATED
18 FILL-IN AND ADJUST THE SIZE OF EXISTING DUCTWORK OPENINGS AS

NEEDED WITHIN THE CURRENT WARRANTY REQURIEMENTS OF THE

EXISTING ROOF MANUFACTURER

KEYNOTES
1 MONITOR, OF/CI
2 NEW GYPSUM BOARD CEILING
3 NEW 2'x4' ACT CEILING
4 EXISTING ACT GRID TO REMAIN, ALL EXISTING ACOUSTIC AL CEILING

TILES TO BE REPLACED
5 RELOCATED EXISTING FIRE ALARM ANNUNCIATOR PANELS, RE-ROUTE

AND CONCEAL THE CONDUITS WITHIN EXISTING WALL, PATCH &

REPAIR AS NEEDED
6 RELOCATED EXISTING GENERATOR CONTROL PANEL
7 RELOCATED EXISTING LOCKER KEY PANELS, EXACT LOCATI ON TBD BY GTRANS
8 JAMB MOUNT ROLLER WINDOW SHADE, 3% OPEN, SEE

SPECIFICATIONS
9 EXISTING GYPSUM BOARD CEILING TO REMAIN
10 WALL MOUNT ROLLER WINDOW SHADE, 3% OPEN, SEE

SPECIFICATIONS
3 3 Owner Revisions BZ PM 06/24/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
TYP
1 1' - 4" 2' - 3" 6' - 5"
7' - 1 1/8" @ (6) EQ
8' - 8"
3 10 PLAM-1
PLAM-1
A-501
5_________________
A-501
7_________________
A-501
8_________________
A-501
6_________________
11 12
PLAM-2
PLAM-1
18 PLAM -1
2 3' - 2"
0' - 1 1/2" 1' - 0" 1' - 8 1/2" 0' - 4"
4 2' - 2" 2' - 9" 2' - 2"
0' - 1 1/2" 0' - 1 1/2" 7' - 4"
PLAM-2
SS
A-501
4_________________
A-501
3_________________
PLAM-2
SS
19 20 3
5 A-501
8_________________
A-501
5_________________
14 EQ EQ
7' - 2"
0' - 1 1/2" @ (4) EQ
6' - 9"
0' - 1 1/2"
5 PLAM-2
PLAM-2 SS
SS
11 19
3' - 6" 1
TYP
9 CL
5' - 0"
A-201 5
A-201
A-201 3 2
SF-1
1' - 2"
7' - 0"
TYP
1 ABOVE
2 3
5' - 8 3/4" 7' - 6" 7' - 10" 10' - 8 1/2"
7 A-201
4 66
7 8
4 ABOVE
2 TYP
9 4' - 1"
2' - 8"
SS
A-501
5_________________
A-501
8_________________
A-501
7_________________
A-501
6_________________
13 F025 F025
5 14
14 INTERVIEW
5 SUPERVISORS
7 PARA TRANSIT
4 VESTIBULE
3 DISPATCH
1 STANDBY
2 6
14 3
9 2' - 5" 2' - 6" 2' - 5"
2' - 0"
A-501
3_________________
A-501
4_________________
4' - 4"
0' - 4"
15 16 16
0' - 6" 7' - 0"
2' - 0"
1 3
21 0' - 4"
2' - 3" 3' - 7" 2' - 10"
SS
PLAM-1
PLAM-1
8' - 0"
2 4
@ (3) EQ
5' - 0"
A-501
1_________________
A-501
2_________________
PLAM-2
3' - 8" 2' - 2" 2' - 10"
20 8' - 8"
21 3' - 0" @ (2) EQ
TYP
9 CL
4' - 8"
14 EQ EQ
9' - 2"
14 9' - 2"
EQ EQ 17 17 17
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
1/4" = 1'-0"
3 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

ENLARGED PLANS & ELEVATIONS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-201
1/4" = 1'-0" A-201
5 DISPATCH - EAST
1/4" = 1'-0" A-201
2 VESTIBULE - EAST
1/4" = 1'-0" A-201
3 VESTIBULE - WEST
1/4" = 1'-0" A-201
8 HALLWAY
1/4" = 1'-0" A-201
1 DISPATCH

KEYNOTES
13 RELOCATED EXISTING MAILBOX KEY PANEL, EXACT LOCAT ION TBD BY GTRANS
14 TIME DISPLAY, WALL MOUNTED, OF/OI
15 BULLETIN BOARD, 4'X 4', OF/OI
16 WALL TO REMAIN
17 WALL MOUNT ROLLER WINDOW SHADE, 3% OPEN, SEE

SPECIFICATIONS
18 6"x18" GRILLES AT EACH CABINET, SEE DETAILS
19 PLASTIC LAMINATE CABINET FILLER PIECE
20 PLASTIC LAMINATE CABINETS WITH SOLID SURFACE COUN TERTOP, TYP
21 REFRIGERATOR [COMPLY WITH 11B-804.6.6], OF/OI

KEYNOTES
1 3-TIER PLASTIC LOCKER
2 PLASTIC LAMINATE UPPER CABINETS
3 EXISTING MAIL BOXES RELOCATED
4 SOLID SURFACE COUNTERTOP
5 SOLID SURFACE COUNTERTOP W/ WATERFALL EDGE
6 RELOCATED EXISTING LOCKER KEY PANELS, EXACT LOCATI ON TBD BY GTRANS
7 RELOCATED EXISTING GENERATOR CONTROL PANEL
8 RELOCATED EXISTING FIRE ALARM ANNUNCIATOR PANELS, RE-ROUTE

AND CONCEAL THE CONDUITS WITHIN EXISTING WALL, PATCH &

REPAIR AS NEEDED
9 MONITOR, OF/CI
10 INTERIOR WINDOW, SEE WINDOW SCHEDULE
11 PLASTIC LAMINATE CABINETS
12 WALL HUNG CABINET WITH OPEN FACE AND SHELVING

GENERAL NOTES

A REFER TO G-SERIES FOR PROJECT GENERAL NOTES, REFERENCE AND MATERIAL SYMBOLS, AND ABBREVIATIONS USED ON THIS DRAWING.

B REFER TO G-101 FOR STANDARD MOUNTING HEIGHTS

C CONTRACTOR TO PROVIDE BLOCKING/BACKING PLATEAS REQUIRED IN PARTITIONS FOR ALL WALL MOUNTED EQUIPMENT.
1/4" = 1'-0" A-201
7 COFFEE BAR - EAST
1/4" = 1'-0" A-201
4 STANDBY - NORTH
1/4" = 1'-0" A-201
6 DISPATCH - SOUTH
3 1 Plan Check Revisions BZ PM 05/20/22
3 Owner Revisions BZ PM 06/24/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

ELEVATION

THREE TIER PLASTIC LOCKER, INSTALL

PER MFR INSTRUCTIONS

SECTION

METAL STUD LOCKER BASE WITH

GYPBOARD AND RUBBER BASE

AT LOWER ACCESSIBLE LOCKERS,
PROVIDE SHELF AT 15" AFF MIN
1'-0"
4" 6'-0"
MAX
1"
TYP
1'-0"

EQ EQ EQ
NOTES:

1. LOCKER COLOR GRAY 9200 PER ASI STORAGE
SOLUTIONS (B.O.D.)

2. PROVIDE ISA LABEL FOR ALL ACCESSIBLE LOCKERS.

3. ALL LOWER LOCKERS PROVIDED WITH SHELFS AND

HOOKS THAT ARE WITHIN REACH RANGES REQUIRED FOR
ACCESSIBILITY.

4. INSTALL LOCKERS PER MANUFACTURER INSTRUCTIONS.

SHIM AS REQUIRED
3/4" PLYWOOD ON MTL STD FRAMING

AS REQUIRED TO SUPPORT LOCKERS

UPPER CABINET

PLAM FINISH ON BO UPPER CABINETS, TYP
1 SOLID SURFACE COUNTERTOP

PER ELEVATIONS

ALL EXPOSED INTERIOR SURFACES

TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJUSTABLE SHELF

WITH BORED HOLES AND METAL SHELF

SUPPORTS

EASED EDGE, TYP

PLAM PER FINISH SCHEDULE

WALL PER PLANS

ELECTRICAL RECEPTACLE PER

ELECTRICAL DRAWINGS WHERE
OCCURS

RUBBER BASE PER SCHEDULE
TYP
3"
U.N.O. ON ELEVATIONS
2'-10"

HARDWARE PER SPECIFICATIONS,

TYP OF ALL DRAWERS AND
DOORS

BACKSPLASH WHERE SHOWN ON

ELEVATIONS
4"
2'-0"
TYP
0' - 1 1/2"
0' - 4"
TYP
0' - 1"
TYP
0' - 1 1/2"
1 3'-10" MAX
1 PLAM PER FINISH SCHEDULE

HARDWARE PER SPECIFICATIONS

ALL EXPOSED INTERIOR SURFACES TO BE

WHITE MELAMINE

PLAM PER FINISH SCHEDULE
3/4" WHITE MELAMINE ADJUSTABLE SHELF WITH

BORED HOLES AND METAL SHELF SUPPORTS
3/4" BOTTOM AND SIDES

RUBBER BASE PER SCHEDULE
3"
4"

ELEC OUTLETS PER ELEC DWGS

ALL EXPOSED INTERIOR SURFACES

TO MATCH CABINET PLAM
3/4" PLAM ADJUSTABLE SHELF

WITH BORED HOLES AND

METAL SHELF SUPPORTS
3' - 7"
2' - 10"
6' - 5"
/2 A-501 SEE UPPER CABINET DETAIL
1' - 0"
3' - 3" MAX
1' - 8"
1 PLAM PER FINISH SCHEDULE AND

ELEVATIONS

ALL EXPOSED INTERIOR SURFACES

TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJUSTABLE

SHELF WITH BORED HOLES AND

METAL SHELF SUPPORTS

HARDWARE PER SPECIFICATIONS

CONTINUE PLAM FINISH ON

UNDERSIDE

SEE ELEVATION
SEE INT. ELEVATIONS
VARIES
1'-2"

PLAM FASCIA TO MATCH CABINET

FINISH WHERE OCCURS

FINISHED CEILING PER RCP
2"

WALL PER PLANS

SOLID SURFACE COUNTERTOP PER ELEVATIONS
OVER (1) LAYER OF 3/4" PLYWOOD SUBSTRATE

INTERIOR WINDOW PER SCHEDULE

CHANNEL AT TO COUNTERTOP

POWER AND DATA

RECEPTACLES PER PLANS

DISPATCH
SIDE
3'-6"

VESTIBULE
SIDE
2'-0"

SEALANT

ALL EXPOSED INTERIOR SURFACES

TO BE WHITE MELAMINE

PLAM PER FINISH LEGEND
3/4" WHITE MELAMINE ADJUSTABLE

SHELF WITH BORED HOLES AND

METAL SHELF SUPPORTS
3/4" BOTTOM AND SIDES

RUBBER BASE PER SCHEDULE

BACK OF CABINET TO BE OPEN

TO ALLOW FOR CABLES IN BACK

OF CABINET

METAL GROMMET

HARDWARE PER SPECIFICATIONS,

TYP OF ALL DOORS

VERTICAL SOLID SURFACE BEYOND
1' - 5"
0' - 1"

ALLOW GAP AT TO CABINET FOR VENTILATION
ALIGN
CUT BACK 12" WIDE PORTION OF BO

CABINET FOR VENTILATION

ADD OPENING TO INSIDE OF

CABINET FOR AIR VENTILATION

AND CABLES
2' - 4"

CABINET LOCKS, TYPICAL OF ALL

CABINETS IN DISPATCH VESTIBULE

PARTITION PER
PLANS

RUBBER BASE PER

SCHEDULE

EXISTING MAILBOXES

TO BE RELOCATED
R.O. PER MAILBOX MFR

MAILBOX MFR
PER
1' - 4"
3/4" PLAM FRAME & DOOR

HARDWARE PER SPECIFICATIONS
NOTES:

1. INSTALL MAILBOXES PER MANUFACTURER INSTRUCTIONS.
1 ALL EXPOSED INTERIOR

SURFACES TO BE WHITE

MELAMINE

PLAM PER FINISH LEGEND
3/4" WHITE MELAMINE ADJUSTABLE

SHELF WITH BORED HOLES AND

METAL SHELF SUPPORTS
3/4" BOTTOM AND SIDES

RUBBER BASE PER

SCHEDULE

SOLID SURFACE COUNTERTOP
PER ELEVATIONS ON 3/4"

PLYWOOD
2' - 0"

COUNTERTOP AND VERTICAL

RETURN BEYOND

INTERIOR GLAZING

VERTICAL SOLID SURFACE BEYOND

POWER/DATA RECEPTACLES

PER PLANS
2' - 2"
1 2' - 8" MAX

SOLID SURFACE

COUNTERTOP PER

ELEVATIONS

ALL EXPOSED INTERIOR SURFACES TO BE

WHITE MELAMINE

PLAM PER FINISH SCHEDULE
3/4" WHITE MELAMINE ADJUSTABLE

SHELF WITH BORED HOLES AND

METAL SHELF SUPPORTS
3/4" BOTTOM AND SIDES

RUBBER BASE PER SCHEDULE

ELEC RECEPTACLES,

SEE ELEC DWGS

ENTIRE INTERIOR OF OPEN

SLOTS TO BE PLAM PER

FINISH SCHEDULE
2' - 0"

INTERIOR GLAZING
14"

METAL GROMMET

VERTICAL SOLID SURFACE BEYOND

HARDWARE PER SPECIFICATIONS,

TYP OF ALL DOORS

ALLOW GAP AT TO CABINET FOR VENTILATION
CUT BACK 12" WIDE PORTION OF BO

CABINET FOR VENTILATION
0' - 1" 6"x18" GRILLES AT

EACH CABINET
2' - 0"
3' - 2"
1 3' - 6" MAX
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

INTERIOR DETAILS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-501
1/2" = 1'-0" A-501
7 LOCKER TYPE 3 - THREE TIER
1" = 1'-0" A-501
1 CABINET - BASE WITH DRAWER
1" = 1'-0" A-501
6 CABINET - BASE WITH FULL DOORS &

UPPER OPEN SHELVES
1" = 1'-0" A-501
2 CABINET - UPPER SECTION
1" = 1'-0" A-501
5 CABINET - DISPATCH WINDOW
1/2" = 1'-0" A-501
8 MAILBOXES
1" = 1'-0" A-501
4 VESTIBULE ISLAND - BASE @ LOW

COUNTER
1" = 1'-0" A-501
3 VESTIBULE CASEWORK - BASE W/

DOORS & OPEN SLOTS
NOTE: CASEWORK/CABINET INSTALLATION SCREWS: 3-1/2" X #14 WASHER HEAD SCREWS WITH

COMBO HI -LO THREAD FOR WOOD OR METAL BACKING, WOOD WORKERS INSTI TUTE APPROVED,

WHITE FINISH
1 1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

C I-JOIST FILLER
400S162-43 BRACE AT
4'-0" o.c. w/ (6) #10

SMS AT EACH END
400S162-43 BRACE AT 4'-0" O.C.
w/ (6) #10 SMS AT EACH END
2X FILLER ON BOTH

SIDE OF JOIST WEB W/
(6) MIN 16d
STAGGERED 2. FOR I JOIST CASE, ADD 2X FILLER ON BOTH SIDE OF WEB AT WHERE BLOCKING OCCURS . SEE DETAIL C/- FOR DETAILS. THE FILLER SHOULD EXTEND 3" BEYOND THE BLOCKING AT EACH END. (5) 8d NAILS - OMIT IF ADJACENT BLOCKING IS USED
3/4" MIN EDGE DISTANCE TO END OF BRACE, 1/4" MAX GA P FROM

END OF BRACE TO TRACK

PLYWOOD SHEATHING

IN LIEU OF NAILS THRU SHEATHING
ABOVE DIAG. BRACE, ADD 4X6 BLK'G EA.

SIDE OF BRACE. SNUG FIT W/ SIMPSON
A34 OR EQ. @ EA. SIDE @ EACH END.
3/4" MIN
TYP
EQ.

WEB OF BRACE
4X6 BLK'G (FLAT) WITH SIMPSON A34 OR EQ. @ EA
SIDE @ EA. END.

JOIST, TYP, SEE
NOTE 2
3/4" MIN. EDGE DIST. & 3/4" MIN. SPACING

BETWEEN SCREWS, TYP
54 MIL MIN. TRACK TO MATCH BRACE SIZE W/ DEEP 2 1/2 " LEG W/ (8) #14"3" WOOD SCREWS INTO BLOCKING
3/4" MIN EDGE DISTANCE TO END OF BRACE,
1/4" MAX GAP FROM END OF BRACE TO TRACK

PLYWOOD SHEATHING
4X6 BLK'G EA SIDE W/ SIMPSON
A34 OR EQ. @ EA. SIDE @ EA. END
WITHIN 12" OF BRACE
3/4" MIN
TYP

WEB OF BRACE,
TYP EQ.

TYP
4X6 BLK'G (FLAT) WITH SIMPSON A34 OR EQ. @ EA
SIDE @ EA. END.

JOIST BEYOND
3/4" MIN. EDGE DIST. & 3/4" MIN. SPACING

BETWEEN SCREWS, TYP
FOR TRACK SEE DETAIL A. OPTION WHERE BRACE ALIGNS

W/ JOIST
(10° MAX HORIZ SKEW)

1. DETAIL APPLIES TO ALL PARTITION WALL CONDITIONS @ ALL SDS CATEGORIES

C I-JOIST FILLER

1. FOR I JOIST CASE, ADD 2X FILLER ON BOTH SIDE OF WEB AT WHERE BLOCKING OCCURS . SEE DETAIL C/- FOR DETAILS. THE FILLER SHOULD EXTEND 3" BEYOND THE BLOCKING AT EACH END. 2X FILLER ON BOTH

SIDE OF JOIST WEB W/
(6) MIN 16d

STAGGERED
4X6 BLK'G (FLAT) @ EA. SCREW
CONN. WITH SIMPSON A34
OR EQ. @ EA. SIDE @ EA. END

PLYWOOD SHEATHING
ROOF/FLOOR JOIST @ 48" O.C. MAX
SEE NOTE 1
PARTITION WALL STUD @ 16" O.C. MAX
PER SCHEDULE ON A-601.
2x FULL HT. BLOCKING WITH SIMPSON A34
OR EQ. @ EA. SIDE @ EA. END, TYP

PLYWOOD SHEATHING
PARTITION WALL STUD @ 16" O.C. MAX
PER SCHEDULE ON A-601.

ROOF/FLOOR JOIST @ 48" O.C. MAX
SEE NOTE 1
16 GA X 2" FLANGES TOP TRACK W/ (2)
#10 WOOD SCREW INTO BLOCKING W/
2" MIN./EMBED. @ 16" O.C.
16 GA X 2" FLANGES TOP TRACK W/ (1)
#10 WOOD SCREW INTO EA. JOIST @
8" O.C. W/ 2" MIN. EMBED
STUD

BASE TRACK

0.157 DIA HILTI X-U SHOT
PINS @ 24" OC MAX (ESR-2269)

EDGE CLEARANCE
#10 SCREW EACH

SIDE EACH STUD

LINTEL SCHEDULE

MAX SPAN DOUBLE STUD SECTION
3' - 0" 362S162-33 X00T200-43*
6' - 0" 600S162-43 X00T200-54*
20' - 0" 800S162-54 X00T200-68*

CONT TOP
TRACK

JAMB STUDS,

SEE SCHED

BRIDGING,
SEE

TYP DETAILS
CONT
BOTTOM
TRACK
BOTTOM
TRACK

ANCHORAGE,

SEE TYP
DETAIL

CRIPPLE WALL

HEADER, SEE

SCHEDULE

SILL AS OCCURS

CRIPPLE WALL,

AS OCCURS
(2) #10 SCREWS @
18" OC, ALTERNATE:
1/8" WELD AT 2" IN
18"
METAL

CRIPPLE STUD

EXTEND WEB

OF HEADER
STUDS
#10 SCREWS

EACH SIDE,

SEE SCHEDULE
TRACK @

OPEN SIDE

JAMB, SEE

SCHEDULE

CRIPPLE STUD

AS OCCURS

AT WINDOW

CONDITION ADDITIONAL

ANCHORAGE
@ JAMB

CONT TRACK

TYPICAL BASE

ANCHORAGE

METAL INFILL STUD

TO MATCH WALL

SIZE AND GAUGE
SILL

AS OCCURS

AT WINDOW

CONDITION
L3x3x16 GA W/ (5) #10

SCREWS EACH LEG
HEADER

MEMBERS,

SEE SCHEDULE

HEADER TRACKS,

SEE SCHEDULE

METAL INFILL STUD

TO MATCH WALL

SIZE AND GAUGE

HEADER AT NON -BEARING WALL OPENING

TRACK SECTION END SIDE SCREWS JAMB STUDS
(6) #10 EACH SIDE (2)
(10) #10 EACH SIDE (2)
(15) #10 EACH SIDE (4)
*TRACK WIDTH TO MATCH WALL WIDTH

CLIP TRACK FLANGE

AT LAP JOINT
(4) #10 SCREWS

AT OVERLAP
TRACK
STUD
FINISH
(2) #10 SCREWS

EACH STUD
6" x 16 GA TAUT

FLAT STRAP

FRAMED WALL, SEE

PLAN FOR SIZE &

SPACING
FINISH

SURFACE
NOTE:

1. FLAT STRAP BACKING TO BE USED FOR COMPONENT LOADS OF MAXIMUM 20 plf OR 50 lb POINT LOAD AT CENTER.

2. STRAP TO EXTEND OVER (3) STUDS MINIMUM.

3. TRACK BACKING TO BE USED FOR COMPONENT LOADS OF MAXIMUM 50 plf OR 250 lb POINT LOAD AT CENTER.

FLAT STRAP BACKING
STUD
600T150-54 UNPUNCHED

CONTINUOUS TRACK,

CLIP FLANGES AT EA STUD
(4) #10 SCREWS AT EACH STUD

TRACK BACKING

TOP TRACK
STUD

DEFLECTION
TRACK

SCREW ATTACHMENT

TRACK SECTION
0' - 1 1/4" CLR
0' - 1" CLR
#10 SCREW EACH

SIDE EACH STUD
NOTE:

1. PROVIDE BRIDGING WITHIN 1'-0" OF TOP TRACK.

S = STUD OR JOIST SECTION
U = CHANNEL SECTION
F = FURRING CHANNEL SECTION
T = TRACK SECTION

S-SECTION U-SECTION T-SECTION F-SECTION
NOMENCLATURE EXAMPLE: 400S162-43
400: 4" SECTION DEPTH
S: STUD SECTION
162: 1.625" FLANGE WIDTH
43: 0.043" SECTION THICKNESS
REFERENCE: STEEL STUD MANUFACTURERS ASSOCIAITON (SSMA)
PROVIDE MINIMUM SECTION PROPERTIES AS DEFINED BY SSMA.

TRACK BELOW
#10 SCREWS
AT 30" OC TYP

TRACK BELOW
#10 SCREWS
AT 30" OC TYP

STUD OR TRACK

SECTION

TYPICAL CORNER
#10 SCREWS
AT 30" OC TYP

STUD OR TRACK

SECTION

TYPICAL INTERSECTION

TRACK BELOW

SOLID BLOCKING SAME GAUGE
AS STUDS AT 8'-0", MIN ONE
BLOCK EACH END OF WALL.

METAL STUDS
1-1/2" x 20 GAUGE TAUT FLAT
STRAPS AT 4'-0" OC MAX
(3) #10 SCREWS

STRAP TO BLOCK
L1-1/2 x 1-1/2 x 18GA CLIP ANGLE
LENGTH=0.8(d) AT 4'-0" OC MAX
(2) #10 SCREWS, TYP

STRAP BRIDGING
#10 SCREW EACH STUD
(2) #10 SCREWS, TYP
(2) #10 SCREWS, TYP
1-1/2" x 18 GA CONT COLD

FORMED CHANNEL AT
4'-0" OC MAX
d

CHANNEL BRIDGING
6" MAX STUD WIDTH
NOTE:

1. STRAPS MAY BE OMITTED ON SIDE OF WALL WITH FULL HEIGHT SHEATHING.

2. BRIDGING MAY BE OMITTED WHEN BOTHS SIDES OF WALL ARE SHEATHED FULL HEIGHT.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

METAL STUD FRAMING DETAILS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-600
3/4" = 1'-0" A-600
9 BOTTOM TRACK ANCHORAGE
1" = 1'-0" A-600
7 METAL STUD TYPICAL WALL FRAMING
3/4" = 1'-0" A-600
6 TOP TRACK AT CORNER
3/4" = 1'-0" A-600
8 TYPICAL BACKING SUPPORT
3/4" = 1'-0" A-600
1 TYPICAL STUD AT SLIP TRACK

PARTITION NOTES
A PARTITIONS THAT ARE DIMENSIONED ON FLOOR PLANS ARE TO THE FACE OF APPLIED FINISH, UNO.

B PARTITION TYPE INDICATIONS ARE INDEPENDENT OF APPLIED FINISHES; RE: FINISH PLAN AND INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION REGARDING APPLIED FINISHES.

C MINIMUM REQUIREMENT FOR CONSTRUCTION OF EACH PARTITION TYPE - AS FOLLOWS: (A) PROVIDE 5/8" GYPSUM BOARD BOTH SIDES, UNO; ( B) PROVIDE 16" O.C. MAX STUD SPACING, UNO; (C) PROVIDE STUDS OF GAUGE INDICATED ON DRAWINGS AND/OR SPECIFICATIONS OR GREATER. (D) PROVIDE STUDS OF DEPTH INDICATED BY THE DRAWINGS. THE DEPTH STATED BY THE REFERENCED APPROVAL OR TEST REPORT (IE UL ASSEMBLY) IS THE MINIMUM DEPTH; (E) USE ACOUSTICAL/THERMAL INSULATION IN ALL FRAME PARTITIONS, UNO; (F) USE ACOUSTICAL JOINT SEALANT AT PERIMETER JOINTS AND OPENINGS OF ALL FRAMED PARTITIONS, UNO.

D PROVIDE FULL HEIGHT 16 GAUGE STEEL STUDS AT 16" OC, WHERE CASEWORK, GRAB BARS, OR OTHER EQUIPMENT IS INSTALLED.

E STEEL STUD FRAMING SHALL BE 25 GAUGE OR HEAVIER, UNO
F PROVIDE 18 GAUGE STEEL STUD FRAMING IN LIEU OF LIGHTER GAUGE STUD FRAMING AT PARTITIONS WITH ONE LAYER OF 5/8" GYPSUM BOARD ON EACH SIDE, THAT EXCEED THE HEIGHT LIMIT INDICATED: (A) 2-1/2" STEEL STUDS: 10'-9" (B) 3-5/8" STEEL STUDS: 14'-0" (C) 4" STEEL STUDS:
15'-0" (D) 6" STEEL STUDS: 20'-0"
G PROVIDE 20 GAUGE STEEL STUD FRAMING AT THE FOLLOWING LOCATIONS: (A) DOUBLE STUD JAMB

ASSEMBLIES AT OPENINGS (B) FIRST STUD IN THE PARTITION BEYOND THE DOUBLE STUD JAMB ASSEMBLY. LOCATE STUD 6" FROM DOUBLE STUD ASSEMBLY. (C) STUD TO WHICH REINFORCING GYPSUM WALL PANELS ARE ATTACHED. (D) STUDS TO WHICH WALL MOUNTED EQUIPMENT INCLUDING METRO FURNISHED EQUIPMENT IS INSTALLED. (E) STUD INFILL AND SILL TRACK BELOW WINDOW OPENINGS. (F) STUDS INSTALLED IN OPENING HEADS BETWEEN DOUBLE STUD JAMB ASSEMBLIES.

H REFER TO PARTITION DRAWINGS FOR ADDITIONAL INDICATION OF STUD GAUGE, DETAIL, AND INSTALLATION REQUIREMENTS.

J REFER TO SPECIFICATIONS FOR CEILING/SOFFIT CONSTRUCTION.

K PROVIDE PENETRATION FIRE STOPPING AT ALL LOCATIONS WHERE PIPES, CONDUIT, DUCTS, ETC.

PASS THROUGH FIRE-RATED CONSTRUCTION.

L AT CEILINGS WHERE PARTITION IS NON-RATED, EXTEND GYPSUM BOARD 6" ABOVE CEILING, UNO.

M SEE SHEET A-601 FOR ALLOWABLE SLIP-TYPE HEAD DETAILS. AT SLIP-TYPE HEAD CONDITIONS, ALLOW FOR 3/4 INCH MINIMUM OF DEFLECTION.

P PROVIDE 1/2" CEMENTITIOUS BACKER BOARD IN PLACE OF GYPSUM BOARD AT ALL WALLS RECEIVING TILE. WATER RESISTANT GYPSUM BOARD SHALL BE USED ON ALL WALLS AND CEILINGS IN WET AREAS.

Q PROVIDE BACKING PLATES AT ALL LOCATIONS WHERE CASEWORK, GRAB BARS AND ALL OTHER EQUIPMENT IS INDICATED OR REQUIRED. MINIUMUM 16 GAUGE 6" STEEL TRACK UNLESS HEAVIER REQUIRED.

R PROVIDE BLOCKING AND DRAFT STOPS PER GOVERNING CODES AND AS INDICATED ON DRAWINGS.

S PROVIDE .093" CONTROL JOINTS AT 30' ON CENTER AT STRAIGHT, UNBROKEN GYPSUM BOARD WALLS PER ASTM C 840 AND SPECIFICATIONS.

T PROVIDE ACCESS PANELS AND FRAMES IN GYPSUM BOARD WALLS WHERE REQUIRED TO ACCESS MECHANICAL EQUIPMENT, PLUMBING EQUIPMENT, DAMPERS, VALVES AND FILTERS. SEE MECHANICAL AND PLUMBING DRAWINGS. COORDINATE LOCATION OF REQUIRED ACCESS PANELS WITH ARCHITECT.

U PROVIDE FIRE-RATED ACCESS PANELS AND FRAMES IN FIRE-RATED GYPSUM BOARD WALLS WHERE REQUIRED.

V USE LIMITING WALL HEIGHT TABLES ON SHEET A-601 FOR ALLOWABLE MINIMUM GAUGE OF METAL STUDS.

W PARTITION TYPE DIAGRAMS DO NOT INCLUDE FINISHES. SEE FINISH SCHEDULES, INTERIOR ELEVATIONS AND/ OR INTERIOR DESIGN DRAWINGS FOR APPLIED FINISH INFORMATION.

A-600
2 COLD FORMED STEEL SECTION ID
1" = 1'-0" A-600
3 TYP STUD WALL INTERSECTIONS
3/4" = 1'-0" A-600
5 TYPICAL METAL STUD BRIDGING
1" = 1'-0" A-600
4 BRACE CONNECTION TO WOOD FRAMING
1" = 1'-0" A-600
10 TOP TRACK CONNECTION INTO WOOD FRAMING
1 1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
BASE

SUB -FLOOR

STRUCTURE
FINISH

CEILING

DECK ABOVE

LOWER SECTION
PLAN

UPPER SECTION

SEE SCHEDULE

LIMITING WALL HEIGHT
DIAGRAM A08

DECK ABOVE
BASE

SUB -FLOOR

STRUCTURE
FINISH

CEILING

DECK ABOVE

LOWER SECTION
PLAN

UPPER SECTION
DIAGRAM F01
LWH TABLE 1-16, NON STRUCTURAL, COMPOSITE
LWH TABLE 1-16

FOR NON-STRUCTURAL COMPOSITE PARTITIONS
STUD
DEPTH

SECTION

LIMITING WALL HEIGHT (LWH) FOR
STUD SPACING @ 16 INCHES O.C.

LWH @ 5 PSF
@ L/240
LWH @ 5 PSF
@ L/360

PAINTED WALLS
(SEE LWH TABLE NOTE 1)

TILED WALLS
(SEE LWH TABLE NOTE 2)
2-1/2"
250S125-18
250S125-30
250S125-33
250S125-43
362S125-18
362S125-30
362S125-33
362S125-43
362S125-54
362S125-68
3-5/8"
11'-3"
12'-0"
9'-9"
12'-9"
14'-9"
10'-6"
11'-0"
12'-9"
6"
600S125-18
600S125-30
600S125-33
600S125-43
600S125-54
600S125-68
8"
800S125-43
800S125-54
800S125-68
14'-3" 12'-3"
15'-6"
16'-3"
18'-0"
19'-6"
20'-0"
13'-6"
14'-3"
15'-6"
17'-0"
17'-3"
19'-9" 17'-9"
23'-0"
24'-6"
28'-3"
30'-0"
32'-0"
20'-3"
21'-3"
24'-6"
26'-0"
28'-0"
34'-3"
36'-6"
39'-9"
30'-0"
32'-0"
34'-9"
LWH TABLE NOTES:

1. USE "PAINTED WALLS" COLUMN FOR WALLS LEFT UNFINI SHED, WALLS PAINTED, OR WALLS RECEIVING ADHERED TILE 4" IN GREATEST LENGTH OR WIDTH DIMENSION.

2. USE "TILED WALLS" COLUMN FOR WALLS RECEIVING ADH ERED TILE GREATER THAN 4" IN ANY LENGTH OR WIDTH DIMENSION.

STRUCTURE ABOVE , SEE 10/A -600
1 M
IN.
2"
MIN.
2"
12" MAX.

FOR MAX. DEFLECTION
SEE PARTITION NOTES A-602

U-CHANNEL BRIDGING

DEFLECTION

TRACK WITH

SLOTTED CLIP

DEFLECTION FLEX
TRACK

DEFLECTION

SLOTTED TRACK

DOUBLE RUNNER SINGLE LONG -LEG
RUNNER
FOR MAX. DEFLECTION
SEE PARTITION NOTES A-602
FOR MAX. DEFLECTION
SEE PARTITION NOTES A-602
FOR MAX. DEFLECTION
SEE PARTITION NOTES A-602
FOR MAX. DEFLECTION
SEE PARTITION NOTES A-602
AT RATED WALL CONDITIONS, USE ANY UL XHBN.HW -D SERIES ASSEMBLY APPROPRIATE TO FRAMING SYSTEM AND SUBSTRATE

WHERE OCCURS, SEE RCP

BRACING TO STRUCTURE ABOVE
6" SEE 4/A -600 1

PARTITION PER
PLAN
16 GA TRACK X 1

STUD BAY MIN
#10 S.M.S EA STUD
MIN 2 STUDS
#10 S.M.S TOP AND
BOTTOM

CHANNEL
PER

SCHEDULE

PROVIDE

COMPRESSION
STRUT, W.O.

OBSTRUCTIONS

ACOUSTICAL OR GYP BD

CLG AS OCCURS

SADDLE TIE HANGERS TO

CHANNEL
#10 SMS TOP & BOTTOM TO

PREVENT HANGER FROM

SLIPPING OFF

PROVIDE COMPR STRUT & SPLAY WIRE WHERE

CLG STRUT OCCURS

DOUBLE HANGER WIRES MAX
8' -0" OR LONGER SPANS 1/6
OUT PLUMB.
.SEPARATE CONNECTION TO
STRUCTURE BY AT LEAST 4
INCHES
12'-0" MAX

WALL WHERE OCCURS C
DBL. SECTION B
DBL. SECTION

AT COMPRESSION STRUT A

SPAN SECTION
4 FT
6 FT
8 FT
10 FT
12 FT
1 1/2" IN X 16 GA C.R.C
DBL 250S137 - 54 STUD
DBL 362S137 - 43 STUD
DBL 400S162 - 33 STUD
DBL 600S162 - 33 STUD
GA
16 18
20 20
#10 SMS @ 16" OC STAGGERED
@ EA END
COMPRESSION STRUT W.O.

ATTACH TO BENT PLATE WITH
(4) #10 SMS
(4) #10 SMS

DBL STUDS PER
SCHED
3" X STUD WIDTH X 1' -0" X 16

GA BENT PLATE
MACHINE BOLT 1/4" DIA

MACHINE BOLT
1/4" DIA
1-1/4"x 1 -1/4" ANGLE STRUT 16 GA MIN

WHERE USE OF SPLAY WIRES IS

OBSTRUCTED
(2) #10 SMS (ALT. 1 MACHINE BOLT) (2) #10 SMS (ALT. 1
MACHINE BOLT) METAL CLIP 12 GA x 3/4"W

ANCHORS TO STRUCTURE AS REQUIRED
SEE 4/A -600 & 10/A -600
1 MIN 8"

DUCT OR OTHER OBSTRUCTION
TYP
6".
8 GA HANGER WIRE
12 GA DIAGONAL
METAL CHANNELS @ 4' -0" OC
4' -0" SPAN = 1 1/2" X 16 GA
6' -0" SPAN = 2 1/2" X 16 GA
8' -0" SPAN = 4" X 16 GA
12' -0" SPAN = 6" X 16 GA

SUSPENDED GYP BD CLG
3" MAX
2 X BLKG W/ (2) 16d

COMMON NAILS AT
EA END

BRACING WIRE
THREE 1 -1/2" X 9 GA STAPLES

OR THREE STRONGHOLD
"J" NAILS AT EACH WIRE LOOP

HANGER WIRE SADDLE TIE

HANGER WIRE
1/4" DIA

DRILLED HOLE EQ
2" MIN 1/4" DIA SCREW EYE

WITH FULL THREAD
EMBEDMENT (1 -1/4" MIN)

INSTALL IN DIRECTION

OF WIRE

BRACING WIRE
THREE 1 -1/2" X 9 GA STAPLES

OR THREE STRONGHOLD
"J" NAILS AT EACH WIRE LOOP
1" MIN

BRACING WIRE

HANGING WIRE

JOIST OR RAFTER
2X FILLER ON BOTH SIDE OF
JOIST WEB W/ (6) MIN 16d

STAGGERED

A I-JOIST FILLER
NOTES:

1. FOR I JOIST CASE, ADD 2X FILLER X 6" LENGTH ON BOTH SIDE OF WEB AT WHERE BLOCKING OCCURS . SEE DETAIL A/ - FOR DETAILS.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

PARTITION TYPES & CEILING DETAILS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-601

PARTITION NOTES
A PARTITIONS THAT ARE DIMENSIONED ON FLOOR PLANS ARE TO THE FACE OF APPLIED FINISH, UNO.

B PARTITION TYPE INDICATIONS ARE INDEPENDENT OF APPLIED FINISHES; RE: FINISH PLAN AND INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION REGARDING APPLIED FINISHES.

C MINIMUM REQUIREMENT FOR CONSTRUCTION OF EACH PARTITION TYPE - AS FOLLOWS: (A) PROVIDE 5/8" GYPSUM BOARD BOTH SIDES, UNO; ( B) PROVIDE 16" O.C. MAX STUD SPACING, UNO; (C) PROVIDE STUDS OF GAUGE INDICATED ON DRAWINGS AND/OR SPECIFICATIONS OR GREATER. (D) PROVIDE STUDS OF DEPTH INDICATED BY THE DRAWINGS. THE DEPTH STATED BY THE REFERENCED APPROVAL OR TEST REPORT (IE UL ASSEMBLY) IS THE MINIMUM DEPTH; (E) USE ACOUSTICAL/THERMAL INSULATION IN ALL FRAME PARTITIONS, UNO; (F) USE ACOUSTICAL JOINT SEALANT AT PERIMETER JOINTS AND OPENINGS OF ALL FRAMED PARTITIONS, UNO.

D PROVIDE FULL HEIGHT 16 GAUGE STEEL STUDS AT 16" OC, WHERE CASEWORK, GRAB BARS, OR OTHER EQUIPMENT IS INSTALLED.

E STEEL STUD FRAMING SHALL BE 25 GAUGE OR HEAVIER, UNO
F PROVIDE 18 GAUGE STEEL STUD FRAMING IN LIEU OF LIGHTER GAUGE STUD FRAMING AT PARTITIONS WITH ONE LAYER OF 5/8" GYPSUM BOARD ON EACH SIDE, THAT EXCEED THE HEIGHT LIMIT INDICATED: (A) 2-1/2" STEEL STUDS: 10'-9" (B) 3-5/8" STEEL STUDS: 14'-0" (C) 4" STEEL STUDS:
15'-0" (D) 6" STEEL STUDS: 20'-0"
G PROVIDE 20 GAUGE STEEL STUD FRAMING AT THE FOLLOWING LOCATIONS: (A) DOUBLE STUD JAMB

ASSEMBLIES AT OPENINGS (B) FIRST STUD IN THE PARTITION BEYOND THE DOUBLE STUD JAMB ASSEMBLY. LOCATE STUD 6" FROM DOUBLE STUD ASSEMBLY. (C) STUD TO WHICH REINFORCING GYPSUM WALL PANELS ARE ATTACHED. (D) STUDS TO WHICH WALL MOUNTED EQUIPMENT INCLUDING METRO FURNISHED EQUIPMENT IS INSTALLED. (E) STUD INFILL AND SILL TRACK BELOW WINDOW OPENINGS. (F) STUDS INSTALLED IN OPENING HEADS BETWEEN DOUBLE STUD JAMB ASSEMBLIES.

H REFER TO PARTITION DRAWINGS FOR ADDITIONAL INDICATION OF STUD GAUGE, DETAIL, AND INSTALLATION REQUIREMENTS.

J REFER TO SPECIFICATIONS FOR CEILING/SOFFIT CONSTRUCTION.

K PROVIDE PENETRATION FIRE STOPPING AT ALL LOCATIONS WHERE PIPES, CONDUIT, DUCTS, ETC.

PASS THROUGH FIRE-RATED CONSTRUCTION.

L AT CEILINGS WHERE PARTITION IS NON-RATED, EXTEND GYPSUM BOARD 6" ABOVE CEILING, UNO.

M SEE SHEET A-601 FOR ALLOWABLE SLIP-TYPE HEAD DETAILS. AT SLIP-TYPE HEAD CONDITIONS, ALLOW FOR 3/4 INCH MINIMUM OF DEFLECTION.

P PROVIDE 1/2" CEMENTITIOUS BACKER BOARD IN PLACE OF GYPSUM BOARD AT ALL WALLS RECEIVING TILE. WATER RESISTANT GYPSUM BOARD SHALL BE USED ON ALL WALLS AND CEILINGS IN WET AREAS.

Q PROVIDE BACKING PLATES AT ALL LOCATIONS WHERE CASEWORK, GRAB BARS AND ALL OTHER EQUIPMENT IS INDICATED OR REQUIRED. MINIUMUM 16 GAUGE 6" STEEL TRACK UNLESS HEAVIER REQUIRED.

R PROVIDE BLOCKING AND DRAFT STOPS PER GOVERNING CODES AND AS INDICATED ON DRAWINGS.

S PROVIDE .093" CONTROL JOINTS AT 30' ON CENTER AT STRAIGHT, UNBROKEN GYPSUM BOARD WALLS PER ASTM C 840 AND SPECIFICATIONS.

T PROVIDE ACCESS PANELS AND FRAMES IN GYPSUM BOARD WALLS WHERE REQUIRED TO ACCESS MECHANICAL EQUIPMENT, PLUMBING EQUIPMENT, DAMPERS, VALVES AND FILTERS. SEE MECHANICAL AND PLUMBING DRAWINGS. COORDINATE LOCATION OF REQUIRED ACCESS PANELS WITH ARCHITECT.

U PROVIDE FIRE-RATED ACCESS PANELS AND FRAMES IN FIRE-RATED GYPSUM BOARD WALLS WHERE REQUIRED.

V USE LIMITING WALL HEIGHT TABLES ON SHEET A-601 FOR ALLOWABLE MINIMUM GAUGE OF METAL STUDS.

W PARTITION TYPE DIAGRAMS DO NOT INCLUDE FINISHES. SEE FINISH SCHEDULES, INTERIOR ELEVATIONS AND/ OR INTERIOR DESIGN DRAWINGS FOR APPLIED FINISH INFORMATION. 3" = 1'-0" A-601
1 SLIP-TYPE HEAD JOINTS
PARTITION SCHEDULE - DIAGRAM A08 (ACOUSTIC)

PARTITION TYPE

DESCRIPTION STUD DEPTH

OVERALL WIDTH

STUD SPACING

HEAD OF WALL

FIRE RATING

STC RATING
A092 SGL LYR 5/8" GYP BD (X) || STL STUD \ 3 1/2" MI NERAL or GLASS || SGL LYR 5/8" GYP BD (X)
3 5/8" 0' - 4 7/8" 16 DECK N/A 47
PARTITION SCHEDULE - DIAGRAM F01 (FURRING)

PARTITION TYPE

DESCRIPTION STUD DEPTH

OVERALL WIDTH

STUD SPACING

HEAD OF WALL

FIRE RATING

STC RATING
F025 STL STUD || 5/8" GYP BD (X) 5 1/2" 0' - 4 5/8" 24 CEILING NR NR 1/2" = 1'-0" A-601
2 TRAPEZE CEILING SUPPORT DETAIL
3" = 1'-0" A-601
4 ACOUSTICAL CLG ALT.RIGID BRACING1
1 1/2" = 1'-0" A-601
3 GYPSUM BOARD TRAPEZE DETAIL
3/4" = 1'-0" A-601
5 HANGER WIRE AND BRACE WIRE CONNECTION INTO WOOD FRAMING 1 1
1 1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

FREE SIDE
BRACE WIRE 12 GA @ 12' -0"
O.C. & 6' -0" FROM ENDS
HANGER WIRE 8 GA @ 4' -0"
O.C. EA WAY

SLIP JOINT

FIXED SIDE
2"

SIDE VIEW
4" X 20GA STUD

COMPRESSION

STRUT, FOR

CONNECTION TO

STRUCTURE

HANGER WIRE

MAIN RUNNER
BRACE WIRE W/ 4
TURNS IN 1 1/2" EA
END
GYP BD
(2) #10 SMS

FURRING

CHANNEL

HANGER WIRE
BRACE WIRE W/ 4
TURNS IN 1 1/2" EA END

CHANNEL STRUT
BEYOND

MAIN RUNNER

FURRING

CHANNEL
SEE 10/A -600
1 SEE 5/A -601 1
SEE 5/A -601 1
(A)
(B)
MAIN CHANNEL 1 1/2" x 16GA
MAIN RUNNER 1 1/2" X 16GA

FURRING CHANNEL
HANGER WIRE 12 GA

FIXED SIDE
1" X 2" X 24 GA CONT ANGLE, ATTACH TO
EA STUD AND MAIN RUNNER W/ #10 SMS
6" MAX
6" MAX METAL STUD FRAMING

FURRING CHANNEL

FIXED SIDE
1" X 2" X 24 GA CONT ANGLE, ATTACH TO
EA STUD AND MAIN RUNNER W/ #10 SMS

GYPSUM BOARD

SEE RCP

SEE RCP
1" CLR

GYPSUM BOARD
(A)
(B)
MAIN CHANNEL 1 1/2" x 16GA
MAIN RUNNER 1 1/2" X 16GA

GYPSUM BOARD

FURRING CHANNEL
HANGER WIRE 12 GA

FREE SIDE

WALL ANGLE, NO CONNECTION

BETWEEN ANGLE AND FURRING

CHANNEL
1" CLR
6" MAX
6" MAX
1" CLR

METAL STUD FRAMING

WALL ANGLE, NO CONNECTION

BETWEEN ANGLE AND FURRING

CHANNEL

FURRING CHANNEL

FREE SIDE

GYPSUM BOARD

MAIN RUNNER AT
4' -0" O.C.

FURRING CHANNEL AT
16" O.C.
3 5/8" X 20GA COMPRESSION STRUT AND (4) 12GA
TAUT BRACING WIRES ORIENTED 90 DEGREES FROM

EACH OTHER, SLOPE OF BRACING WIRES NOT TO
EXCEED 45 DEGREES FROM PLANE OF CEILING,
FASTEN W/ FOUR TIGHT TURNS WITHIN 1 -1/2", FOR

ADDITIONAL INFO SEE
12GA HANGER WIRES SPACED
4' -0" O.C. EA WAY, FASTEN W/
THREE TIGHT TURNS IN 3"
NOTE:

PROVIDE ONE SET OF FOUR BRACING WIRES AND
COMPRESSION STRUT FOR EACH 144 SQ. FT. OF
CEILING AREA (MAX). SPACE MAX 12' -0" X 12' -0".

LOCATE FIRST SET 6' -0" MAX FROM ADJACENT WALL.
/7 A-602

FREE SIDE

SEISMIC RESTRAINT

COMMPRESSION STRUT,
SEE:

SLOTTED ANGLE SPACER

EXPOSED CROSS GRID
MEMBER @ 2' -0" O.C.

EXPOSED MAIN GRID MEMBER
@ 4' -0" O.C.

HANGER WIRE 8 GA @
4' -0" O.C. EACH WAY

FIXED SIDE
NOTE:

CEILING MAY BE FIXED TO WALLS
AT TWO ADJACENT SIDES; OTHER
TWO SIDES SHALL BE FREE, TYP.
4'-0" MAX @ RATED CLG.
6'-0" MAX 12'-0" MAX
8'-0" MAX
4'-0" MAX
/7 A-602
. SEISMIC RESTRAINT
COMMPRESSION STRUT, SEE:
6'-0" MAX
12'-0" MAX
6'-0" MAX

FREE SIDE
12'-0" MAX 6'-0" MAX

MAIN RUNNERS AT
4' -0" O.C.

HAT CHANNELS AT 16"
O.C.
144 SQ FT MAX

FIXED SIDE
12 GA HANGER WIRE AT
4' -0" O.C. EA WAY
A-602
8 SIM
A-602
8 SIM
A-602
9 SIM
A-602
9 SIM
/7 A-602
2' X 2' SCORE LINE

WHERE OCCURS AT
2' x 4' CLG PANEL

AT ACOUSTICAL CEILING,
LOCATE MISC. CEILING
DEVICE (I.E. SPEAKERS ETC)
CENTER OF 2' x 2' PANEL

AT GYP BD CEILING,
CENTER MISC. CEILING
DEVICE (I.E. SPEAKERS

ETC) IN ALIGNMENT

WITH DIMENSIONED
FIXTURES. SEE RCPS.

DIFFUSER

LIGHT FIXTURE
LIGHT

FIXTURE

PER RCP

STRUCTURE OR CEILING
ABOVE

INTERIOR METAL STUD

FRAMING AS REQUIRED
5/8" GYP BD CEILING

CORNER BEAD, TYP

ACT CEILING

STRUCTURE ABOVE
5/8" GYP BD

INTERIOR METAL STUD

FRAMING
5/8" GYP BD CEILING

CORNER BEAD, TYP

CEILING , SEE RCP

PER RCP
6" MIN

CEILING, SEE RCP

PER RCP
NOTES:

1. MAX CLG WEIGHT PERMITTED SHALL BE PER ICC -ESR -2631.

2. PER ICC -ESR, MAX 15/16" WIDE WALL ANGLE AND ELIMINATIO0N OF SPACER BARS IS ALLOWABLE IN LIEU OF 2" WIDE ANGLE REQUIRED IN ASCE 7, SECTION 13.5.6.2.2 B. FREE SIDE A. FIXED SIDE
TYP 7/8"

PERIMETER

MOLDING MAIN RUNNER

ACOUSTIC
PANEL

SHOWN DASHED

SEISMIC CLIP

W/SCREW

ATTACHMENT TO

MAIN RUNNER
TYP 7/8" PERIMETER

MOLDING
8" MAX 8" MAX
[ELEVATION] [ELEVATION]
3/4" FROM GRID TO

INSIDE OF ANGLE
C. FREE EDGE
[ELEVATION]

PERIMETER TRIM
0' - 4"

CEILING JOIST SCHEDULE

MAX SPAN,

NO ACCESS JOIST SIZE
10' - 0" 5'-0" 250S137-43 @ 16"OC
14' - 0" 8'-0" 400S137-43 @ 16"OC
18' - 0" 10'-0" 600S137-43 @ 16"OC

SOLID BLOCKING,

SNUG FIT,

IN END BAY AND AT
8'-0" OC

MAX EACH WAY

WALL PARALLEL TO JOIST
1-1/2"x4x16 GA ANGLE CLIPS
BY 3"
LONG w/ (2) #10 SCREWS

EACH LEG
NOTE:

1. BRIDGING NOT REQUIRED WHERE JOISTS ARE
SHEATED.

TYPICAL JOIST BRIDGING WALL PERPENDICULAR TO JOIST
STRAP AND #10

SCREW EACH
JOIST

TYPICAL BRIDGING

OVER WALL

CEILING JOIST

CONT TOP TRACK
WITH (2) #10 SCREWS

TO JOIST

CEILING JOIST

CONT TOP TRACK WITH
#10 SCREWS TO JOIST
AT 18" OC MAX, (2) SCREWS
MIN

MAX SPAN,

WITH ACCESS

JOIST LEDGER WALL BEARING
L2x2x18 GA CLIP
x JOIST DEPTH
WITH (3) #10
SCREWS

EACH LEG

CEILING JOIST,

SEE SCHED
CONT 16 GA TRACK
WITH (3) #10 SCREWS

TO EACH STUD
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

CEILING DETAILS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-602
3" = 1'-0" A-602
3 ACOUSTICAL CLG SUSPENSION @ INTERSECTIONS
3" = 1'-0" A-602
7 CHANNEL STRUT
3" = 1'-0" A-602
8 GYPSUM BD CLG PERIMETER - FIXED
3" = 1'-0" A-602
9 GYPSUM BD CLG PERIMETER - FREE
1/2" = 1'-0" A-602
5 SUSPENSION CEILING BRACING1
3" = 1'-0" A-602
2 TYP ACOUSTICAL CLG SUSPENSION
3" = 1'-0" A-602
6 TYP GYPSUM BD CLG SUSPENSION
3" = 1'-0" A-602
1 TYPICAL GUIDELINES FOR RCP LAYOUTS
3" = 1'-0" A-602
11 ACT CEILING TO GYPSUM CEILING
3" = 1'-0" A-602
10 GYPSUM SOFFIT HEADER
3" = 1'-0" A-602
4 SUSPENDED ACT CLG - PERIMETER
1" = 1'-0" A-602
12 TYPICAL CEILING FRAMING
1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

GLAZING TYPES
GL1 1/4" CLEAR GLAZING
GL1 -T 1/4" CLEAR SAFETY GLAZING

ABBREVIATIONS
- NONE

NA NOT APPLICABLE

NR NOT RATED

ALUM CLEAR ANODIZED ALUMINUM

DEMO DEMOLISH

EXIST EXISTING

GL GLAZING

HM HOLLOW METAL

SC WD SOLID CORE WOOD DOOR
PT PAINT, REFER TO FINISH LEGEND A -701

DOOR REMARKS

1. ACCESS CONTROL, CARD READER TO MATCH THE EXISTING SYSTEM (CARD READER OF/OI)

2. VENEER AND FINISH TO MATCH EXISTING DOOR
D01
W
D02
W
H H
6" TYP
D03
W
H
22" 6" TYP
2' - 6"
1' - 0"
12" MIN
H
W
2" 2"
2"
F01 F02
H
W2"
2"
2"
1'-2" 2"
F02b
H
W2"
2"
2"
APPROX 3'-2" 2"
VIF

GROUND FLOOR
0' - 0" GL1-T
3' - 4"
3' - 10"
11' - 10 1/2"
GL1-T
7' - 5 1/2" 1' - 2" 3' - 3"
GL1-T
7' - 2"
A-621
3_________________
A-621
1_________________
A-621
2_________________
A-621
3_________________
A-621
2_________________
A-621
4_________________
2' - 1"
7' - 1" 9' - 2"
GL1-T
4' - 4"
A-621
3_________________
A-621
3_________________
A-621
1_________________
GL1-T GL1-T
A-621
4_________________
A-621
2_________________
W3
SLIDER
W2 W1
6' - 0"
W
3' - 6"
W4
H
3' - 6"
H
W
6' - 0"
H
W
NO -DRAFT, SPEAK -THRU DEVICE.

BOD: CRL PRODUCT #834A

BUTT -GLAZED
EQ EQ
H
W
EQ EQ
4' - 10"
BOD WINDOW SYSTEM: CRL 490 SERIES.

PROVIDE W/ MFR'S STANDARD ROLLER
STOPS AND ALUM FINGER PULL (PART D639A)

DOOR HARDWARE
HW #1

QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE, FULL MORTISE TA2714 4 -1/2" x 4 -1/2" US26D MK 1 EA PASSAGE LATCH ML2010 PSA M17 630 RU 1 EA SURFACE CLOSER 7540ST 689 NO 1 EA THRESHOLD PER SILL DETAIL PE NOTE: GASKET SEALS BY ALUMINUM STOREFRONT DOOR / FRAME DIVISION HW #2

QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE, FULL MORTISE TA2714 4 -1/2" x 4 -1/2" US26D MK 1 EA PASSAGE LATCH ML2010 PSA M17 630 RU 1 EA SURFACE CLOSER PR7500 689 NO 1 EA KICK PLATE K1050 10" high CSK BEV US32D RO 1 EA WALL STOP 430 -RKW US26D RO 1 EA THRESHOLD PER SILL DETAIL PE NOTE: GASKET SEALS BY ALUMINUM FRAME DIVISION
HW #3

QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE, FULL MORTISE TA2714 4 -1/2" x 4 -1/2" US26D MK 1 EA PASSAGE LATCH ML2010 PSA M17 630 RU 1 EA CONCEALED OVERHEAD STOP 2-X36 630 RF 1 EA THRESHOLD PER SILL DETAIL PE NOTE: GASKET SEALS BY ALUMINUM FRAME DIVISION
HW #4

QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE, FULL MORTISE TA2714 4 -1/2" x 4 -1/2" US26D MK 1 EA ENTRANCE LOCK ML2053 PSA M34 M17 630 RU 1 EA CYLINDER MATCH EXISTING 626 RU 1 EA WALL STOP 430 -RKW US26D RO 1 EA THRESHOLD 151A OR PER SILL DETAIL PE 1 EA DOOR BOTTOM 434APKL PE NOTE: GASKET SEALS BY ALUMINUM FRAME DIVISION
HW #5

QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE, FULL MORTISE TA2 714 NRP 4 -1/2" X 4 -1/2" US26D MK 1 EA HINGE, FULL MORTISE TA2 714 QC8 4 -1/2" X 4 -1/2" US26D MK ⚡ 1 EA FAIL SECURE ELEC LOCK ML2090 6-SEC PSA M17 M92 630 RU ⚡ 1 EA CYLINDER MATCH EXISTING 626 RU 1 EA SURFACE CLOSER P R7500 689 NO 1 EA KICK PLATE K1050 10" HIGH CSK BEV US 32D RO 1 EA WALL STOP 430 -RKW US26D RO 1 EA THRESHOLD 151A OR PER SILL DETAIL PE 1 EA GASKETING S88D PE 1 EA DOOR BOTTOM 434APKL PE 1 EA ELECTROLYNX HARNESS (DOOR) QC -C300 MK ⚡ 1 EA ELECTROLYNX HARNESS (FRAME) QC -C1500P MK ⚡ 1 EA POSITION SWITCH DPS -W-GR SU ⚡ 1 EA POWER SUPPLY AQD2 SU ⚡ 1 EA CARD READER HID WALL MOUNTED FURNISHED BY SECU RITY CONTRACTOR HD NOTES: ACCESS CONTROL READER TO BE FURNISHED BY SECURITY INTEGRA TOR HW #6

QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE, FULL MORTISE TA2 714 NRP 4 -1/2" X 4 -1/2" US26D MK 1 EA HINGE, FULL MORTISE TA2 714 QC8 4 -1/2" X 4 -1/2" US26D MK ⚡ 1 EA FAIL SECURE ELEC LOCK ML2090 6-SEC PSA M17 M92 630 RU ⚡ 1 EA CYLINDER MATCH EXISTING 626 RU 1 EA SURFACE CLOSER P7580 1618 689 NO 1 EA DOOR STOP 471 EXP US26D RO 1 EA THRESHOLD PER SILL DETAIL PE 1 EA ELECTROLYNX HARNESS (DOOR) QC -C300 MK ⚡ 1 EA ELECTROLYNX HARNESS (FRAME) QC -C1500P MK ⚡ 1 EA POSITION SWITCH DPS -W-GR SU ⚡ 1 EA POWER SUPPLY AQD2 SU ⚡ 1 EA CARD READER HID WALL MOUNTED FURNISHED BY SE CURITY CONTRACTOR HD NOTES: ACCESS CONTROL READER TO BE FURNISHED BY SECURITY INTEGRA TOR

GASKET SEALS BY ALUMINUM STOREFRONT DOOR / FRAME DIVISION The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

DOOR & WINDOW SCHEDULE
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-611

DOOR AND FRAME SCHEDULE
NO HW

DOOR FRAME DETAILS
FIRE

RATING REMARKS
SIZE

TYPE MATL FINISH GLASS HEAD JAMB SILL W H T TYPE MATL FINISH GLASS 2 1 3' - 0" 7' - 0" 0' - 1 3/4" D02 ALUM ALUM GL1-T SF2 ALUM A LUM GL1-T 2/A-621 2/A-621 4/A-621 NR 3A 6 3' - 0" 7' - 0" 0' - 1 3/4" D02 ALUM ALUM GL1-T F02 ALUM ALUM GL1-T 2/A-621 2/A-621 1/A-621 - 4/A-621 NR 1 3B 6 3' - 0" 7' - 0" 0' - 1 3/4" D02 ALUM ALUM GLT-1 SF1 ALUM ALUM GL1-T 2/A-621 2/A-621 1/A-621 - 4/A-621 NR 1 4A 3 3' - 0" 7' - 0" 0' - 1 3/4" D02 SC WD SEE REMARKS GL1- T F01 ALUM ALUM - 2/A-621 2/A-621 1/A-621 NR 2 4B 2 3' - 0" 7' - 0" 0' - 1 3/4" D02 SC WD SEE REMARKS GL1- T F01 ALUM ALUM - 2/A-621 2/A-621 1/A-621 NR 2 5A 4 3' - 0" 7' - 0" 0' - 1 3/4" D02 SC WD SEE REMARKS GL1- T F01 ALUM ALUM - 2/A-621 2/A-621 1/A-621 NR 2 5B 5 3' - 0" 7' - 0" 0' - 1 3/4" D01 SC WD SEE REMARKS - F01 HM PT-3 - 5/A-621 5/A-621 4/A-621 NR 1, 2 7 5 3' - 0" 7' - 0" 0' - 1 3/4" D03 SC WD SEE REMARKS GL1-T F01 HM PT-3 - 5/A-621 5/A-621 4/A-621 NR 1, 2 20 2 3' - 0" 7' - 0" 0' - 1 3/4" D02 SC WD SEE REMARKS GL1- T F02b ALUM ALUM GL1-T 2/A-621 2/A-621 5/A-621 - 4/A-621 NR 2

GENERAL NOTES
A ALL GLAZING WITHIN 18" OF FLOOR AND EITHER SIDE OF DOOR OR OPERABLE WINDOW SHALL BE SAFETY

GLAZING
B REFER TO A-621 FOR DOOR DETAILS
C REFER TO A-621 FOR WINDOW DETAILS
D "W" SEE SCHEDULE FOR WIDTH
E "H" SEE SCHEDULE FOR HEIGHT
F OPERABLE PARTS OF ACCESSIBLE DOOR HARDWARE HEIGHT SHALL BE LOCATED 34"-44" ABOVE FINISH FLOOR
G "S" SEE SCHEDULE FOR SILL HEIGHT, ALL SILL HEIGHTS ARE TAKEN FROM FINISH FLOOR LEVEL U.N.O.

H REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL LOUVER INFORMATION. MECHANICAL DRAWINGS INDICATED MINIMUM LOUVER SIZE REQUIRED. CONTRACTOR TO COORDINATE MECHANICAL REQUIREMENTS AND ARCH LOUVER SCHEDULE AND PROVIDE WHICHEVER SIZE IS GREATER.

J ALL DOORS TO COMPLY WITH 2019 CBC 11B.309.4: OPERA BLE PARTS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS (22.2 N) MAXIMUM.

K DOOR CLOSERS AND GATE CLOSERS SHALL BE ADJUSTED SO THAT FROM AN OPEN POSITION OF 90 DEGREES, THE TIME REQUIRED TO MOVE THE DOOR TO A POSITION OF 12 DEGREES FROM THE LATCH IS 5 SECONDS MINIMUM.

L OPERABLE WINDOWS TO MEET CBC AND ACCESSIBILITY PUS H/PULL WEIGHT REQUIREMENTS. WINDOW OPERATION CAN NOT EXCEED 5 LBS.

M ALL DOORS TO COMPLY WITH 2019 CBC 11B-404.2.7.
1/4" = 1'-0"

DOOR TYPES
1/4" = 1'-0"

FRAME TYPES

WINDOW SCHEDULE

TYPE MARK QTY

FRAME DETAIL
FIRE
RATING

GLAZING

TYPE REMARKS
R.O.

WIDTH
R.O.

HEIGHT
SILL

HEIGHT MATL COLOR HEAD JAMB(S) SILL
W1 1 1' - 6" 5' - 8" 3' - 6" ALUM CLEAR ANODIZED 7/A-621 9/ A-621 6/A-621 NR GL1-T W2 1 7' - 0" 3' - 2" 6' - 0" ALUM CLEAR ANODIZED 7/A-621 9/ A-621 6/A-621 NR GL1 W3 1 7' - 0" 5' - 8" 3' - 6" ALUM CLEAR ANODIZED 10/A-621 9 /A-621 8/A-621 NR GL1-T OPERABLE W4 1 5' - 0" 3' - 2" 6' - 0" ALUM CLEAR ANODIZED 7/A-621 9/ A-621 6/A-621 NR GL1 1/4" = 1'-0" A-611
1 SF-1 - HALLWAY
1/4" = 1'-0" A-611
2 SF-2 - VESTIBULE
1/4" = 1'-0"

WINDOW TYPES
1 1
1 Plan Check Revisions BZ PM 05/20/22
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

DOOR PER SCHEDULE

FRAME PER SCHEDULE

CONT SEALANT,

BOTH SIDES

SHIM AS REQUIRED

PER PLAN

PARTITION

J-CHANNEL, TYP
SEE

FOR GLAZED CONDITION
/3 A-621

ALUMINUM FRAME
1 1/2" SEE ELEVATION

FOR DIMENSIONS

GLAZING

AS REQUIRED

FLOOR FINISH

PER SCHEDULE

AS REQIRED

PARTITION PER PLANS

ALUMINUM FRAME SIDELITE

HEAD/JAMB

GLAZING

GASKETS PER ALUM

FRAME MFR, TYP

DOOR PER SCHEDULE

SEE FINISH PLAN FOR FLOOR

TRANSITION WHERE OCCURS
U.N.O.
1/4" MAX UNDERCUT,

PROVIDE FLOORING

MANUFACTURER'S STANDARD

RUBBER TRANSITION STRIPS

INTERIOR

PER PLANS

PARTITION

FRAME PER WINDOW MFR,

FINISH PER SCHEDULE

GLAZING PER SCHEDULE

CONT SEALANT,

BOTH SIDES

FIXED PANEL

SLIDING PANEL

J-CHANNEL, TYP

SHIM AS REQUIRED

METAL STUD HEADER AS REQ'D
~ 2 1/2"

FIXED GLAZING

PER SCHEDULE

WRAP EDGE OF OPENING W/

GYP BD, BOTH SIDES
JAMB @ EDGE OF OPENING

AGAINST PARTITION

PER PLAN

PARTITION

CLEAR SILICON AT JOINT

RECESSED CHANNEL
BELOW

GLAZING PER SCHEDULE

GASKETING AND SEALANT PER

WINDOW MFR

INTERIOR

FIXED PANEL SLIDING PANEL

CHANNEL PER WINDOW MFR

FOR FIXED PANELS

SOLID SURFACE

COUNTERTOP PER

ELEVATIONS

GUIDE CHANNEL FOR

SLIDING PANEL(S) PER

WINDOW MFR

DOOR PER SCHEDULE

FRAME PER SCHEDULE

DOOR HEAD/JAMB,

SEE STRUCTURAL
EQ EQ

CONT SEALANT,

BOTH SIDES

PER PLAN

PARTITION

CLIP AT JAMB CONDITION

PER PLAN

PARTITION

GLAZING PER SCHEDULE

BLOCKING AS REQUIRED
2" DEEP ALUMINUM GLAZING HEAD

CHANNEL RECESSED INTO GYP BD,

ANCHORED TO STUD

CONT SEALANT, ALL SIDES

GLAZING PER SCHEDULE

PER PLAN

PARTITION

BLOCKING AS REQUIRED
3/4" DEEP GLAZING SILL CHANNEL

RECESSED INTO GYP BD,

ANCHORED TO STUD

CONT SEALANT, ALL SIDES
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
3" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

DOOR & WINDOW DETAILS
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-621
3" = 1'-0" A-621
2 ALUM INT. DOOR HEAD/JAMB
3" = 1'-0" A-621
1 ALUMINUM FRAME - SILL
3" = 1'-0" A-621
3 ALUMINUM SIDELITE FRAME -

HEAD/JAMB
3" = 1'-0" A-621
4 INTERIOR DOOR SILL
3" = 1'-0" A-621
10 SLIDING WINDOW HEAD
3" = 1'-0" A-621
9 WINDOW JAMB
3" = 1'-0" A-621
8 SLIDING WINDOW SILL
3" = 1'-0" A-621
5 HM DOOR HEAD/JAMB
3" = 1'-0" A-621
7 RECESSED - WINDOW HEAD
3" = 1'-0" A-621
6 RECESSED - WINDOW SILL
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D

DISPATCH
1 INTERVIEW
5 HALLWAY
15 (EXIST) AV
EQUIP
29 (EXIST) MEN
QUIET
25 (EXIST)

UNIFORM
23 (EXIST) MENS

RESTROOM
SHOWER
22 (EXIST)

DRIVER'S ROOM
20 SUPERVISORS
7 LOCKERS/

STORAGE

STANDBY
2 VESTIBULE
3 COFFEE BAR
(EXIST) OPS

MANAGER
3 (EXIST)

TRAINING ROOM
30 (EXIST) ELEC
28 (EXIST) MENS

RESTROOM
27 (EXIST) KITCHEN
21 PARA TRANSIT
4 PT -2
PT -2PT -2
3' - 0"
7' - 8"
48" FROM FFE TO

CL OF MONITOR
48" FROM FFE TO

CL OF MONITOR
60" FROM FFE TO

CL OF MONITOR
56" FROM FFE TO

CL OF MONITOR
TYP
1 2
3' - 9"
5' - 0"
5' - 0"
3 CPT -1
FINISHES LEGEND:

FLOOR MATERIALS
LVT

INTERIOR FINISH & MATERIAL LEGEND
ARCHITECTURAL FINISHES: FLOOR FINISHES:

PLAM -2: PLASTIC LAMINATE
MFR: LAMIN -ART
COLOR: NATURAL PEARWOOD (3122)
FINISH: VELLUM FINISH
DESCRIPTION: AT ALL PLAM LOCATIONS UNLESS NOTED OTHERWISE SS: SOLID SURFACE COUNTERTOP
MFR: CORIAN QUARTZ
COLOR: GEO GRIGIO
THICKNESS: 3/4" (2cm)
PLAM -1: PLASTIC LAMINATE
MFR: LAMIN -ART
COLOR: PEARL WHITE (9202)
FINISH: VELLUM FINISH
DESCRIPTION: AT UPPER CABINETS ONLY WHERE NOTED IN ELEVATIONS

LVT LUXURY VINYL TILE
MFR: MANNINGTON
COLLECTION: AMTICO NORTHERN WONDER
STYLE: APPARITION
COLOR: WONDER (NW104)
SIZE & LAYOUT: VERIFY WITH GTRANS
CPT -1 CARPET TILE
MFR: MANNINGTON
COLLECTION: INTRINSIC
STYLE : CONFLUENCE
COLOR: AUTHENTICITY (13002)
SIZE & LAYOUT: VERIFY WITH GTRANS
BASE FINISHES:

RB RUBBER WALL BASE
MFR: MANNINGTON
COLLECTION: BURKE
COLOR: ROCKY 660
TYPE: COVED PROFILE
SIZE: 4"
PAINTS:

PT -1: FIELD PAINT (WHITE)
MFR: BENJAMIN MOORE
COLOR: CHANTILLY LACE OC -65
FINISH: EGGSHELL - TYP
PT -2: PAINT (ACCENT)
MFR: BENJAMIN MOORE
COLOR: 1475 GRAYSTONE
FINISH: EGGSHELL
CEILING FINISHES:

ACT -1: ACOUSTICAL CEILING TILE
MFR: ROCKFON
STYLE: ARTIC (WHITE), SQUARE TEGULAR GRID (MATCH COLOR) SIZE: 2' x 2' x 5/8"
T-GRID: CHICAGO METALLIC 200 SNAP GRID
GB: GYPSUM BOARD CEILING
FINISH: LEVEL 5 FINISH, PT -1, U.N.O.

ACT -2: ACOUSTICAL CEILING TILE

TO MATCH EXISTING ACT
PT -3: PAINT (HM DOOR FRAME)

TO MATCH EXISTING HM DOOR FRAME

DISPATCH
1 INTERVIEW
5 HALLWAY
15 (EXIST)

DRIVER'S ROOM
20 SUPERVISORS
7 LOCKERS/

STORAGE

STANDBY
2 VESTIBULE
3 COFFEE BAR
(EXIST) KITCHEN
21 PARA TRANSIT
4 The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

FINISH PLAN & FINISH SCHEDULE
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-701
1/8" = 1'-0" A-701
1 GROUND FLOOR FINISH PLAN

ROOM FINISH SCHEDULE

NUMBER NAME AREA

FLOOR WALLS CEILING

REMARKS FINISH BASE

NORTH SOUTH EAST WEST

FINISH FINISH FINISH FINISH FINISH

GROUND FLOOR
1 DISPATCH 394 SF CPT-1/LVT RB PT-1 PT-1 PT-1 PT-1 ACT-1 2 STANDBY 196 SF CPT-1 RB PT-1 PT-1 PT-1 PT-1 ACT-1
3 VESTIBULE 147 SF LVT RB PT-1 PT-1 PT-2 PT-1 ACT-1
4 PARA TRANSIT 84 SF CPT-1 RB PT-1 PT-1 PT-1 PT-1 ACT-1 5 INTERVIEW 87 SF CPT-1 RB PT-1 PT-1 PT-1 PT-1 ACT-1
7 SUPERVISORS 323 SF CPT-1/LVT RB PT-1 PT-1 PT-2 PT-1 ACT-1/ GB PT-1 SEE FINISH PLAN FOR ACCENT PAINT AREAS 15 HALLWAY 1,139 SF LVT RB PT-1 PT-1 PT-1 PT-1 ACT-1/ACT-2

GENERAL FINISH NOTES
M ALL ACCESS PANELS SHALL BE PAINTED TO MATCH ADJACENT FINISH.

P REFER TO FINISH SCHEDULE, LEGEND, GROUND FLOOR FINISH PLAN ON A-701 Q WHERE INDICATED, ACCENT PAINT TO COVER ENTIRE EXTENT OF WALL INDICATED.

R STAINLESS STEEL CORNER GUARD PER 'WALL AND DOOR PROTECTION' SPECIFICATION AT ALL OUTSIDE CORNERS. ALIGN B.O. CORNER GUARD WITH T.O. WALL BASE.

S ALL MATERIALS AND FINISHES TO BE COMPLIANT WITH THE GREEN BUILDING CODE REQUIREMENTS AS NOTED ON G-002.

T CONTRACTOR SHALL PROVIDE APPROPRIATE BACKING FOR ALL WALL MOUNTED MONITORS, PANELS, ETC.

U REMOVE AND RE-INSTALL EXISTING ROOM SIGNS

GENERAL FINISH NOTES

A FINISHES AND MATERIALS LISTED ARE BASIS OF DESIGN PRODUCTS, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

B ALL INTERIOR PARTITIONS AND COLUMNS SHALL BE PAINTED WHITE U.N.O.

C GENERAL CONTRACTOR TO PREPARE FLOOR AND INSTALL ADHESIVES, FLOORING MATERIALS AND BASE.

D SCHEDULED FLOOR FINISH SHALL CONTINUE UNDER CASEWORK WITH ATTACHED TOE KICKS, EQUIPMENT, AND FREESTANDING FURNITURE.

E RUBBER BASE SHALL BE USED THROUGHOUT.

F REFER TO REFLECTED CEILING PLANS FOR EXTENT OF DRYWALL CEILING SHALL BE PAINTED. ALL DRYWALL CEILINGS AND SOFFITS SHALL BE FLAT FINISH.

G ALL FLOORING TRANSITIONS TO OCCUR AT CENTERLINE OF DOORWAYS, U.N.O.

H ALL GYPSUM BOARD TO BE LEVEL 4 WALL FINISH, U.N.O. CEILING TO BE LEVEL 5 FINISH, U.N.O.

J REFER TO ELEVATIONS, DETAILS AND FINISH PLANS FOR EXTENT OF ALL FINISH DESIGNATIONS.

K TERMINATE PAINT AT EDGE OF GLASS WHERE APPLICABLE.

REPLACE THE EXISTING FLOORING WITH LVT ON CIRCULATION AREAS OF THE ENTIRE GROUND FLOOR AS SHOWN ON PLAN. REPLACE THE OLD WALL BASE WITH THE NEW RUBBER WALL BASE.
1/16" = 1'-0" A-701
4 OVERALL - GROUND FLOOR FINISH PLAN
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION
ST ST
24TC 30TC
24TC 24TC 30TC
24TC 24TC 30TC
24TC
BBF
C1R C1R C1L C1L
7228 BASE BAR
4272
24 M-HALRECR BIF
30EPS
4272
2 A
C
B
1 D

DISPATCH
1 INTERVIEW
5 HALLWAY
15 (EXIST) AV
EQUIP
29 (EXIST) MEN
QUIET
25 (EXIST)

UNIFORM
23 (EXIST) MENS

RESTROOM
SHOWER
22 (EXIST)

DRIVER'S ROOM
20 SUPERVISORS
7 STANDBY
2 VESTIBULE
3 COFFEE BAR
(EXIST) OPS

MANAGER
3 (EXIST)

TRAINING ROOM
30 (EXIST) ELEC
28 (EXIST) MENS

RESTROOM
27 PARA TRANSIT
4 LOCKERS

MAILBOXES

BUILT -IN CASEWORK

BUILT -IN CASEWORK

BUILT -IN CASEWORK

BUILT -IN

CASEWORK/

COUNTER

PRINTER
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

ISSUE FOR BID
1/4" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249

FURNITURE PLAN - FOR REFERENCE
ONLY
Stantec Architecture Inc.
801 S. Figueroa St., Suite 300
Los Angeles, CA 90017
Tel: (213) 955-9775 • www.stantec.com
BKZ WT BKZ 2022.07.06
2014226901
A-901
1/4" = 1'-0" A-901
1 GROUND FLOOR FURNITURE PLAN - FOR REFERENCE
05/20/2022

ISSUE FOR BID

NOT FOR CONSTRUCTION

THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS AND CODES AND INCLUDE, BUT NOT BE LIMITED TO, THE LATEST ADOPTED EDITIONS OF:
2019 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE
PART 1, TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR)
2019 CALIFORNIA BUILDING CODE
PART 2, TITLE 24, CCR
2019 CALIFORNIA ELECTRICAL CODE
PART 3, TITLE 24 CCR
2019 CALIFORNIA MECHANICAL CODE
PART 4, TITLE 24, CCR
2019 CALIFORNIA PLUMBING CODE
PART 5, TITLE 24, CCR
2019 CALIFORNIA BUILDING EFFICIENCY STANDARDS
PART 6, TITLE 24 CCR
2019 CALIFORNIA FIRE CODE
PART 9, TITLE 24, CCR
2019 CALIFORNIA GREEN CODE
PART 11, TITLE 24, CCR

WHERE LAWS AND CODES ARE FOUND TO BE IN CONFLICT WITH EACH OTHER, THE MORE STRINGENT REQUIREMENTS WILL PREVAIL.

1. ALL MECHANICAL EQUIPMENT SHALL BE ANCHORED OR BRA CED TO MEET THE HORIZONTAL AND VERTICAL FORCES AS PRESCRIBED IN THE 2019 CBC AND ASCE 7-10 SECTIONS 13.3, 13.4 AND 13.6.

THE ATTACHMENT OF THE FOLLOWING ITEMS SHALL BE DESI GNED TO RESIST THE FORCES AS PRESCRIBED ABOVE, BUT NEED NOT BE DETAILED ON THE PLANS.

A.EQUIPMENT WEIGHING LESS THAN 400 POUNDS SUPPORTED DIRECTLY ON THE FLOOR OR ROOF.

B.TEMPORARY OR MOVEABLE EQUIPMENT.

C.EQUIPMENT WEIGHING LESS THAN 20 POUNDS SUPPORTED BY VIBRATION ISOLATORS.

D.EQUIPMENT WEIGHING LESS THAN 20 POUNDS SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL.

FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON T HE APPROVED DRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE MECHANICAL ENGINEER AND THE OWNER'S REP.

2. PIPING AND DUCTWORK SYSTEMS SHALL BE BRACED TO RE SIST THE FORCES AS PRESCRIBED IN ASCE 7-10 SECTION

13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.8, 13.6.7 AND 13.6.5.5, ITEM 6 RESPECTIVELY. THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL COMPLY WITH ONE OF THE OSHPD PRE-APPROVALS WITH AN OPA#, SUCH AS MASON INDUSTRIES (OPA 349), OR ISAT (OPA 485) AS MODIFIED TO SATISFY ANCHORAGE REQUIREMENTS OF ACI 318, APPENDIX D.

CONSTRUCTION NOTES

1. FLEX DUCT MAY BE USED, BUT IS LIMITED TO A MAXIMUM OF FIVE (5) FEET AT BRANCH ENDS OF RUNS TO SUPPLY & RETURN AIR DISTRIBUTION DEVICES ONLY.

2. SYSTEMS TO BE BALANCED TO SUPPLY AIR IN QUANTITIES SHOWN ON PLANS. PROVIDE AN INDEPENDENT AIR BALANCE REPORT CERTIFIED BY AABC.

3. INSULATE ALL SUPPLY AND RETURN DUCTWORK EXTERNALL Y EXCEPT WHERE SHOWN WITH A LINING.

4. DUCT INSULATION SHALL BE APPROVED AND MEET CLASS 1 REQUIREMENTS NOT TO EXCEED A FLAME SPREAD OF 25 NOR SMOKE DEVELOPED RATING OF 50.

5. ALL REQUIRED CEILING/WALL ACCESS PANELS ARE FURNI SHED UNDER THE MECHANICAL SECTION AND INSTALLED BY THE GENERAL CONTRACTOR. SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO INSTALLATION.

6. UPON COMPLETION OF THE TEST AND BALANCE OF THE HV AC SYSTEMS AND WITH THE SYSTEM OPERATING AT

DESIGN CAPACITY, AIR-BORNE SOUND LEVEL MEASUREMENTS SHALL BE MADE TO FIELD VERIFY NOISE EMISSIONS IN ACCORDANCE WITH SPECIFICATIONS AND LOCAL ORDINANCES.

7. DURING CONSTRUCTION, PROTECT OPENINGS AND MECHANI CAL EQUIPMENT FROM DUST AND POLLUTANTS; SEAL PERMANENT HVAC DUCTS/EQUIPMENT STORED ON SITE.

8. DUCTS TO AND FROM AIR TERMINALS SHALL MATCH INLET S AND OUTLETS OF AIR TERMINALS UNLESS NOTED OTHERWISE.

ANCHORAGE NOTES

APPLICABLE CODES
• LOCATION: GARDENA, CA
• ELEVATION: 40 FT
• SUMMER DESIGN DRY BULB/COINCIDENT WET BULB: 92 DEG F / 69 DEG F • WINTER DESIGN TEMPERATURE: 37 DEG F

OUTDOOR CLIMATE CONDITIONS

DEMOLITION NOTES

1. THE CONTRACTOR SHALL VISIT THE SITE AND BE THORO UGHLY FAMILIARIZED WITH THE EXISTING CONDITIONS PRIOR TO BIDDING. INFORMATION GIVEN ON T HESE DRAWINGS ABOUT THE EXISTING

INSTALLATION HAS BEEN OBTAINED FROM THE EXISTING AS-BUILT DRAWINGS BUT CANNOT BE GUARANTEED ACCURATE IN ALL RESPECTS. VERIFY ALL SUCH INFORMATION BEFORE PROCEEDING WITH ANY NEW WORK THAT MAY BE AFFECTED. INCLUDE AS PART OF THE CONTRACT ALL WORK REQUIRED TO PRODUCE THE INDICATED RESULT.

2. UPON SUBMITTING A BID THE CONTRACTOR SHALL BE HE LD TO HAVE MADE SUCH EXAMINATIONS OF THE SITE

AND NO ALLOWANCE FOR EXTRAS WILL BE ALLOWED FOR ANY ERROR OR OVERSIGHT RESULTING FORM THE CONTRACTOR'S UNFAMILIARITY WITH THE SITE OR EXISTING CONDITIONS.

3. CONTRACTOR SHALL NOT SCALE DRAWINGS. DIMENSIONS MISSING FROM PLANS OR NEEDED FOR EXECUTION

OF WORK SHALL BE CLARIFIED OR PROVIDED BY THE FACILITY REPRESENTATIVE BEFORE WORK IS INSTALLED.

4. INTERRUPTION OF EXISTING SERVICES: THE CONTRACTO R'S ATTENTION IS CALLED TO THE PRESENCE OF EXISTING, CONDUIT, PIPING, ETC. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE PROPER AND APPROVED REPAIR OF ANY AND ALL DAMAGE CAUSED BY HIM OR HIS WORK TO EXISTING BUILDING. ANY

INTERRUPTIONS REQUIRED SHALL BE SCHEDULED TO MINIMIZE INCONVENIENCE TO THE FACILITY, AND AT TIMES AS APPROVED IN ADVANCE BY THE FACILITY REPRESENTATIVE. NEW WORK AND INSTALLATIONS SHALL NOT IMPAIR THE PROPER FUNCTIONING OF THE EXISTING F ACILITY. THE COMPLETED PROJECT SHALL BE A PROPERLY FUNCTIONING ENTITY THROUGHOUT. FURNISH ALL LABOR AND MATERIALS REQUIRED TO RELOCATE, REMOVE, REINSTALL, RECONNECT, REPLACE, ETC. ANY EXISTING PIPING TO ACCOMMODATE THE WORK. CONTRACTOR SHOULD CONSIDER IN HIS BID ANY EXTRA WORK REQUIRED TO MINIMIZE SHUTDOWN TIME.

5. EQUIPMENT FIXTURE, PIPING ETC. THAT ARE TO BE RE MOVED/DEMOLISHED SHALL BE THE PROPERTY OF THIS

CONTRACTOR UNLESS NOTED FOR SALVAGE BY FACILITY AND SHALL BE REMOVED IN ITS ENTIRELY FROM THE PREMISES.

6. BEFORE DEMOLITION COMMENCES ON SITE, ALL EXISTIN G EQUIPMENT TO BE RETAINED AND REUSED WILL BE SURVEYED AND VALIDATED TO ESTABLISH CONDITION AND CAPACITIES. ANY EXISTING DAMAGE TO

EQUIPMENT IS TO BE RECORDED AT THIS STAGE BY THE CONTRACTOR AND A FULL WRITTEN REPORT SUBMITTED TO THE FACILITY REPRESENTATIVE FOR REVIEW. THE REPORT WILL INCLUDE PHOTOGRAPHIC EVIDENCE OF DAMAGE.

7. CONTRACTOR TO CROSS REFERENCE DEMOLITION & NEW C ONSTRUCTION DRAWINGS TO ENSURE CONSISTENCY IN DESIGN INTENT BEFORE PROCEEDING WITH ANY DEMOLITION WORK. ANY PIPE, VALVE, EQUIPMENT THAT IS MISTAKENLY DEMOLISHED SHALL BE RESTORED AT CONTRACTOR'S COST.

8. ALL POWER SUPPLIES TO EXISTING EQUIPMENT TO BE R EMOVED SHALL BE ISOLATED AND MADE SAFE PER NEC PRIOR TO DEMOLITION STARTS. THIS PROCESS SHALL BE COORDINATED WITH FACILITY REPRESENTATIVES.

9. CONTRACTOR TO DO PRE-DEMOLITION SURVEY AND RED T AG UTILITIES FOR DEMOLITION. COORDINATE WITH FACILITY REPRESENTATIVE ALL PROPOSED UTILITY SHUT DOWN AND ISOLATION PRIOR TO DEMOLITION.

GENERAL NOTES

1. CONTRACTOR SHALL VISIT SITE TO REVIEW SCOPE OF WO RK PRIOR TO SUBMISSION OF BID.

2. DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT PLACEMENT OF NEW WORK.

VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD BEFORE PROCEEDING WITH WORK. EXACT PLACEMENT SHALL BE COORDINATED BASED ON ACTUAL FIELD MEASUREMENTS AND CONDITIONS.

3. COORDINATE REQUIREMENTS OF NEW WORK WITH OTHER TR ADES AND PROVIDE ALL NECESSARY APPURTENANCES

AND INCIDENTAL LABOR, INCLUDING PARTS AND ACCESSORIES, CONNECTIONS, SYSTEM START-UP AND TESTING AS REQUIRED TO ACHIEVE A COMPLETE FULLY FUNCTIONING INSTALLATION READY FOR OPERATION.

4. PRIOR TO FABRICATION, CONTRACTOR SHALL PREPARE FU LLY COORDINATED DETAILED SHOP DRAWINGS (DRAWN TO SCALE) OF ALL PROJECT WORK AND SUBMIT TO THE OWNER'S REPRESENTATIVE FOR REVIEW AND APPROVAL. SHOP DRAWINGS SHALL INCLUDE DETAILED PLAN VIEW LAYOUTS (1/4" SCALE MINIMUM) SHOWING EQUIPMENT, DUCTWORK AND PIPING WITH DUCT AND PIPE SIZES AND ELEVATIONS ABOVE FINISHED FLOOR. COORDINATE WORK WITH OTHER TRADES AS REQUIRED TO ACHIEVE INTENDED ARCHITECTURAL ELEVATIONS.

5. AVOID ROUTING PIPING ABOVE ELECTRICAL EQUIPMENT A ND CABLE TRAYS. WHERE INSTALLATION OF PIPING ABOVE ELECTRICAL EQUIPMENT OR CABLE TRAYS IS UNAVOIDABLE, INSTALL PIPING WITH A MINIMUM NUMBER OF JOINTS.

JOINTS, FITTINGS, VALVES OR SIMILAR COMPONENTS SHAL L BE LOCATED A MINIMUM OF 36 INCHES FROM EACH SIDE OF EQUIPMENT OR TRAY. PROVIDE DRIP PAN(S) WITH MOISTURE DETECTION ABOVE CRITICAL EQUIPMENT.

6. ALL WORK SHALL COMPLY WITH THE CALIFORNIA CODE OF REGULATIONS, TITLE 24 (2019 EDITION), INCLUDING THE 2019 CALIFORNIA BUILDING CODE (CBC), 2019 CALIFORNIA MECHANICAL CODE (CMC), 2019 CALIFORNIA PLUMBING CODE (CPC), 2019 CALIFORNIA FIRE CODE (CFC) AND 2019 CALIFORNIA ELECTRICAL CODE (CEC).

7. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE GENERAL CONDITIONS OF THE PRIME CONTRACT.

8. CONSTRUCTION SHALL BE ORGANIZED IN SUCH A MANNER AS TO MINIMIZE DISRUPTION TO FACILITY OPERATIONS AN D DISTURBANCE OF PATIENTS AND STAFF. NOTIFY OWNER'S REPRESENTATIVE A MINIMUM OF 48 HOURS IN ADVANCE OF ANY REQUIRED SYSTEM SHUTDOWNS, DISTURBANCE OF OR ENCROACHMENT INTO OCCUPIED AREAS. PERFORM ACTIVITIES SUCH AS MASONRY DRILLING AND SAWCUTTING ONLY DURING DESIGNATED HOURS; DAMPEN NOISE AND VIBRATION TRANSMITTED TO OCCUPIED AREAS TO THE GREATEST EXTENT POSSIBLE. MAINTAIN EGRESS FROM OCCUPIED AREAS AT ALL TIMES. DO NOT OBSTRUCT OR OTHERWISE IMPEDE PEDESTRIAN OR VEHICULAR TRAFFICWAYS CRITICAL TO THE ONGOING OPERATION OF THE FAC ILITY.

9. CONTRACTOR SHALL COMPLY WITH THE FACILITY'S INFECTION CONTROL RISK ASSESSMENT (ICRA) POLICIES AND PROCEDURES THROUGHOUT CONSTRUCTION OF THE PROJECT. AIR BALANCE PRECAUTIONS, DUST PROTECTION

MEASURES AND CONTAINMENT/ISOLATION OF CONSTRUCTION ACTIVITIES SHALL BE MAINTAINED AT ALL TIMES TO

PROTECT OCCUPIED AREAS AND ASSOCIATED HVAC SYSTEMS FROM CONTAMINATION BY AIRBORNE POLLUTANTS (INCLUDING DUST, SMOKE, FUMES AND ODORS) GENERATED BY CONSTRUCTION ACTIVITIES.

10. MEANS, METHODS AND TIMING OF WORK SHALL BE COORD INATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE INSOFAR AS THEY AFFECT FACILITY OPER ATIONS. MEANS AND METHODS ARE STILL SUBJECT TO ACCEPTANCE BY THE AUTHORITY HAVING JURISDICTION AND MUST COMPLY WITH DESIGN AND CODE INTENT.

11. REFER TO STRUCTURAL DRAWINGS FOR SEISMIC CRITERI A.

12. THE EQUIPMENT MANUFACTURERS AND MODELS SPECIFIED ON THE DRAWINGS SERVE AS THE BASIS OF DESIGN. NO

SUBSTITUTIONS OF ANY EQUIPMENT ARE ALLOWED WITHOUT FIRST OBTAINING APPROVAL FROM THE OWNER'S REPRESENTATIVE. ANY PROPOSED SUBSTITUTIONS MUST BE FROM ONE OF THE ALTERNATE MANUFACTURERS LISTED IN THE SPECIFICATIONS; MUST MATCH THE PHYSICAL CONF IGURATION AND REQUIREMENTS OF THE SPECIFIED MODEL

INCLUDING OVERALL DIMENSIONS, INLET AND OUTLET CONF IGURATION, REQUIRED CLEARANCES, ACCESS AND POWER REQUIREMENTS; AND MUST MEET SEISMIC CERTIFICATION R EQUIREMENTS WHERE MANDATED BY THE AUTHORITY HAVING JURISDICTION. PERFORMANCE FEATURES AND CONSTRUCTION OF ANY PROPOSED SUBSTITUTION SHALL MEET OR EXCEED THOSE SPECIFIED ON THE DRAWINGS AND IN TH E SPECIFICATIONS. STRUCTURAL ENGINEERING

CALCULATIONS FOR EQUIPMENT SUPPORT AND ANCHORAGE SHALL BE SUBMITTED BY THE CONTRACTOR AT THE TIME

OF SUBMITTAL OF ANY SUBSTITUTION FOR REVIEW BY THE ARCHITECT, MECHANICAL AND STRUCTURAL ENGINEERS OF RECORD. SUBSTITUTIONS REQUIRING CHANGES TO THE CON TRACT DOCUMENTS BY MEANS OF A CHANGE ORDER ARE NOT ALLOWED.

13. WHERE EXISTING UTILITIES NOT SHOWN ON THE DRAWIN GS ARE ENCOUNTERED, NOTIFY OWNER'S REPRESENTATIVE IMMEDIATELY. SUPPORT AND PROTECT UTILITIES UNTIL PR OVISIONS CAN BE MADE FOR RELOCATION OR OTHER SOLUTION.

14. CUTTING AND DEMOLITION WORK SHALL NOT COMPROMISE STRUCTURAL INTEGRITY OF THE EXISTING CONSTRUCTION OR DAMAGE PORTIONS OF EXISTING WORK TO REMAIN.

15. OWNER RESERVES THE RIGHT TO RETAIN ALL MATERIALS AND EQUIPMENT REMOVED FROM THE PROJECT. ANY ITEMS

OR MATERIALS NOT DESIRED BY THE OWNER SHALL BE REMOVED FROM THE OWNER'S PROPERTY BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.

16. COORDINATE METHOD, ROUTE AND TIMING OF MATERIAL AN D DEBRIS REMOVAL WITH OWNER'S REPRESENTATIVE PRIOR TO ANY REMOVAL.

17. PATCH AND REPAIR ANY DAMAGE TO WALLS, FLOORS, CEILI NGS, CABINETS, HARDWARE, WINDOWS, FIXTURES, ETC.

RESULTING FROM PROJECT WORK. REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR DRYWALL AND FINISH PATCHWORK AND REPAIR REQUIREMENTS. MATCH EXISTING FINISHES AS CLOSELY AS POSSIBLE UNLESS NOTED OTHERWISE. PATCHES AND REPAIRS SHALL RESTORE FINISH TO "LIKE NEW" CONDITION.

18. SEAL AND PROTECT ALL PIPE, DUCT AND CONDUIT PENETRA TIONS OF FLOORS, WALLS, CEILINGS AND ROOF. METHODS AND MATERIALS USED FOR TREATMENT OF PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE U.L. AND FIRE MARSHAL APPROVED.

19. ALL LOCATIONS FOR CORING THROUGH CONCRETE SLAB F LOORS AND WALLS SHALL BE CONFIRMED BY A CALIFORNIA LICENSED STRUCTURAL ENGINEER. USE X-RAY IMAGING WHEN NECESSARY TO LOCATE STRUCTURAL SLAB REINFORCEMENT.

20. ALL ROOFING AND FLASHING ELEMENTS SHOWN ON THESE DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR ALL ROOFING AND FLASHING DETAILS.

21. CONTRACTOR MAY SUBSTITUTE NEW ROUND OR RECTANGUL AR DUCT SHOWN ON PLANS WITH ROUND OR RECTANGULAR DUCT OF EQUIVALENT OR GREATER CROSS-SECTIONAL AREA. CONTRACTOR TO INDICATE ON SHOP DRAWING SUBMITTAL WHERE SUCH SUBSTITUTIONS OCCUR.

22. CONTRACTOR SHALL COORDINATE FINAL THERMOSTAT LOC ATIONS WITH OTHER TRADES, INCLUDING ARCHITECTURAL, ELECTRICAL AND FIRE ALARM.

23. CONTRACTOR SHALL LABEL ALL VALVES SEQUENTIALLY USING TH E EXISTING FACILITY TAG INVENTORY LIST. USE METAL TAGS. TAGS SHALL TO BE 2" DIAMETER AND FABRICATED OF BRASS OR STAINLESS STEEL. TAGS SHALL BE ATTACHED WITH JACK CHAIN MADE FROM THE SAME MATERIAL.

24. PROTECT DUCT OPENINGS AND MECHANICAL EQUIPMENT DU RING CONSTRUCTION. LIMIT USE OF PERMANENT HVAC DURING CONSTRUCTION TO CONDITIONING NECESSARY FOR MATERIAL AND EQUIPMENT INSTALLATION. IF PERMANENT HVAC IS USED DURING CONSTRUCTION, INSTALL MERV-8 FILTERS ON RETURNS, AND REPLACE ALL FILTERS

IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS OCCUPIED DURING ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. (CalGreen 5.504.1.3 AND 5.504.3).

GENERAL NOTES (CONT.)

25. EXACT LOCATIONS OF ALL CEILING DIFFUSERS, REGIST ERS AND GRILLES ARE DETAILED ON THE ARCHITECTURAL REFLECTED CEILING PLANS AND INTERIOR ELEVATIONS.

26. EXACT LOCATION OF ALL ROOF AND STRUCTURAL OPENIN GS SHALL BE COORDINATEDWITH THE STRUCTURAL AND ARCHITECTURAL DRAWINGS.

27. MECHANICAL EQUIPMENT PLATFORMS AND ROOF CURBS SH ALL BE AS INDICATED ON THE STRUCTURAL PLANS.

THE CONTRACTOR SHALL COORDINATE EXACT SIZES OF REQUIRED OPENING AND SUPPORTS FOR FURNISHED EQUIPMENT. SEE ARCHITECTURAL PLANS FOR ROOFING AND FLASHING.

28. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCOR DANCE WITH THE EQUIPMENT MANUFACTURER'S R ECOMMENDATIONS. CONTRACTOR TO PROVIDE ALL FITTINGS, TRANSITIONS, DAMPERS, VALVES, AND OTHER DEVICES REQUIRED FOR A COMPLETE WORKABLE INSTALLATION.

29. MANUAL VOLUME DAMPERS SHALL BE PROVIDED IN ALL D UCT BRANCHES TO INDIVIDUAL DIFFUSERS, GRILLES AND REGISTERS, WHETHER THEY ARE SHOWN ON THE DRAWINGS OR NOT. PROVIDE REMOTE DAMPER OPERATORS SUCH AS YOUNG'S REGULATOR OR EQUAL WHEN DAMPERS ARE LOCATED ABOVE INACCESSIBLE CEILINGS.

30. ALL EQUIPMENT, DUCTS PIPING, AND OTHER DEVICES A ND MATERIALS INSTALLED OUTSIDE OF THE BUILDING OR OTHERWISE EXPOSED TO THE WEATHER SHALL BE COMPLETELY WEATHERPROOFED.

31. ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED AND T ESTED IN ACCORDANCE WITH THE LOCAL REGULATIONS

AND PROCEDURES DETAILED IN THE APPLICABLE STANDARDS ADOPTED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION. (SMACNA)

32. PENETRATIONS OF PIPES, CONDUITS, ETC. IN WALLS R EQUIRING PROTECTED OPENINGS SHALL BE FIRE STOPPED.

FIRE STOP MATERIAL SHALL BE A UL-LISTED ASSEMBLY APPROVED BY THE FIRE MARSHAL.

33. MANUFACTURERS INSTALLATION INSTRUCTIONS SHALL BE MADE AVAILABLE TO THE INSPECTING AUTHORITIES.

34. PENETRATION OF RATED ASSEMBLIES SHALL BE FIRE ST OPPED USING AN APPROVED PENETRATION FIRESTOP AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479 WITH A MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01

INCH OF WATER AND SHALL HAVE AN F AND T RATING OF NOT LESS THAN THE REQUIRED FIRE RESISTANCE RATING OF THE ASSEMBLIES.

35. DUCT/PIPE INSULATION AND DUCT LINING MATERIAL SH ALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION INCLUDING INSULATION, FACING MATERIALS, TAPES AND ADHESIVES AS NORMALLY APPLIED.

36. PROVIDE AND MAINTAIN ACCESS AND WORKING SPACE NE AR MECHANICAL, ELECTRICAL AND CONTROL EQUIPMENT TO PERMIT READY AND SAFE OPERATION, EXAMINATION AND MAINTENANCE.

37. CONTRACTOR SHALL REFER TO ALL OTHER DOCUMENTS FO R COORDINATION, REFERENCE DATA AND VERIFICATION PURPOSES. COORDINATE WORK WITH OTHER TRADES AND ALL JOB CONDITIONS.

38. PRIOR TO START UP EACH PIECE OF EQUIPMENT COMPRI SING PART OF MECHANICAL

SYSTEM SHALL BE CHECKED FOR PROPER LUBRICATION, DRIVE ROTATION, BELT TENSION, PROPER CONTROL

SEQUENCE AND ANY OTHER CONDITION WHICH MAY CAUSE IMPROPER EQUIPMENT OPERATION, DAMAGE TO EQUIPMENT OR ENDANGER PERSONNEL.

39. ALL SUPPLY AND EXHAUST AIR EQUIPMENT SHALL INCOR PORATE DAMPERS THAT AUTOMATICALLY CLOSE DURING PERIODS OF NON-USE. THE DAMPERS SHALL BE EITHER MOTORIZED OR OF THE GRAVITY TYPE AS INDICATED ON DRAWINGS OR SPECIFIED.

40. DUCT SIZES INDICATED ON DRAWINGS REPRESENT NET I NSIDE DIMENSIONS.

41. COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING OUT WORK AND EQUIPMENT. COORDINATE WORK WITH OTHER TRADES AND ALL JOB CONDITIONS. #. COPIES OF THE MANUAL SHALL BE ON THE JOB SITE PRIOR TO STARTING HANGING AND BRACING OF THE PIPE AND DUCTWORK SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS.

42. ALL MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE ANCHORED OR BRACED TO MEET THE HORIZONTAL AND VERTICAL FORCES/DISPLACEMENTS PRESCRIBED IN THE 2019 CBC AND ASCE 7-10 SECTIONS 13.3, 13.4 & 13.6.

43. ALL AHU/HVAC UNIT DUCT-SMOKE DETECTORS SHALL BE CONNECTED TO BUILDING FIRE ALARM PANEL TO INITIATE A SUPERVISORY SIGNAL UPON ACTIVATION PER NFPA 72 & 2019 CMC.

44. ALL AHU/HVAC UNIT DUCT-SMOKE DETECTORS SHALL BE TESTED BY MANOMETER TO INSURE AIR VOLUME AND

VELOCITIES ARE WITHIN THE TOLERANCE SPECIFICATIONS OF THE RATINGS REQUIRED BY THE MANUFACTURER'S DATA ON EACH DUCT-SMOKE DETECTOR INSTALLED WITHIN THE UNIT/ DUCTWORK PER NFPA 72 & 2019 CMC §608.

45. ALL MATERIALS EXPOSED IN DUCTS, SUPPLY AIR PLENU MS AND RETURN AIR PLENUMS SHALL BE NON- COMBUSABLE OR SHALL HAVE A FLAME SPREAD INDEX NOT TO EXCEED 25 AND SMOKE DEVELOPED RATING NOT TO EXCEED 50,WHEN RESTED AS COMPOSITE PRODUCT IN ACCORDANCE WITH ASTM E-84 OR UL 723.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:00:59 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

GENERAL NOTES, SYMBOLS AND

LEGENDS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-001

MECHANICAL SHEET LIST
M-001 GENERAL NOTES, SYMBOLS AND LEGENDS
M-002 GENERAL NOTES, SYMBOLS AND LEGENDS
M-003 MECHANICAL SPECIFICATIONS
M-004 MECHANICAL SPECIFICATIONS
M-005 MECHANICAL SCHEDULES
M-006 MECHANICAL TITLE 24
M-200 MECHANICAL ZONING PLAN
M-201 MECHANICAL FLOOR PLANS - NEW CONSTRUCTION
M-202 MECHANICAL HOT WATER PIPING PLAN
M-601 MECHANICAL DETAILS
M-602 MECHANICAL DETAILS
M-701 MECHANICAL CONTROL DIAGRAM
M-702 MECHANICAL CONTROL DIAGRAM
MD-201 MECHANICAL FLOOR PLANS - DEMOLITION
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
0 1' 2'
EL.

CL
?
? ?

DETAIL NUMBER

SHEET ON WHICH

DETAIL IS SHOWN

DETAIL CALLOUTS
?
??
__________________________

BUILDING SECTIONS

SECTION NUMBER

SHEET ON WHICH

SECTION IS SHOWN
?
??
__________________________
?
??
__________________________

WALL SECTIONS

SECTION NUMBER

SHEET ON WHICH

SECTION IS SHOWN
FLOOR
0'-0"

FLOOR OR ROOF LEVEL NAME

VERTICAL ELEVATION

NORTH ARROW
? DRAWING REVISION
N

MATCH LINE
SLOPE
10000
0000
0000
M01
X

GRAPHIC SCALES - ENGINEERING

ELEVATION

ELEVATION - CEILING

ROOM TAG

KEY NOTE TAG

SLOPE ARROW

CIRCULAR BREAK SYMBOL

CENTER LINE

CIRCLE BREAK SYMBOL

GRID BUBBLE AND LINE

GENERAL SYMBOLS

POINT OF CONNECTION OF NEW TO EXISTING
SYSTEM

DEMOLITION

EXISTING

POINT OF DISCONNECTION OF DEMOLITION FROM

EXISTING

NEW WORK

CAP OFF EXISTING
CTE

GENERAL SYMBOLS

BRINE RETURN

CHILLED WATER RETURN

BRINE SUPPLY

VENTILATION (HVAC)

BOILER BLOWDOWN BBD

PIPING SYSTEMS (HVAC)

BOILER FEED WATER BFW
BR
BS
CHWR

CHILLED WATER SUPPLY CHWS
STEAM - CLEAN (NOMINAL PRESSURE) CS(##)

CONDENSER WATER RETURN CWR

CONDENSER WATER SUPPLY CWS

NATURAL GAS G

REFRIGERANT LIQUID REF(L)

REFRIGERANT SUCTION REF(S)

REFRIGERANT VENT REF(V)

RELIEF VENT RV
STEAM (NOMINAL PRESSURE) S(##)
2-WAY
2-WAY
3-WAY
3-WAY

TWO-WAY ELECTRIC CONTROL VALVE, BUTTERFLY TYPE

THREE-WAY ELECTRIC CONTROL VALVE, BUTTERFLY TYPE

SUCTION DIFFUSER

REAL OBJECT SYMBOL

PIPING COMPONENTS

SIGHT FLOW GLASS
ANCHOR

AUTOMATIC AIR VENT

MANUAL AIR VENT

BALANCING VALVE

CHECK VALVE (GENERIC)

FLEXIBLE CONNECTOR

EXPANSION JOINT

SHOCK ABSORBER

PRESSURE GAUGE

TEMPERATURE GAUGE

Y STRAINER (GENERIC)

STEAM TRAP (GENERIC)
GUIDE

NEEDLE VALVE

TEMPERATURE AND PRESSURE TAP

GATE VALVE

GLOBE VALVE

PRESSURE REDUCING VALVE

BALL VALVE

PLUG VALVE
BUTTERFLY VALVE NPS 6 AND LESS

BACKFLOW PREVENTER (GENERIC)

PIPE CAP

PIPE BREAK

FLOW ARROW

PIPING ELBOW DOWN

PIPING ELBOW UP

PIPING TEE UP

PIPING TEE DOWN

PIPING SLOPE
1%

PUMP (GENERIC)

ISOLATION VALVE (GENERIC)

FLOW LIMITING VALVE

VACUUM BREAKER

MULTI-PURPOSE VALVE (SHUTOFF, BALANCING AND CHECK)
2-WAY CONTROL VALVE (GENERIC)
3-WAY CONTROL VALVE (GENERIC)

PIPE CROSS
BFP
BUTTERFLY VALVE NPS 8 AND MORE

STEAM VENT SV
STEAM CONDENSATE (NOMINAL PRESSURE) C(##)
STEAM PUMPED CONDENSATE (NOMINAL PRESSURE) PC(##)
RECTANGULAR DUCT WITH ACOUSTIC LINING*

AIR FLOW ARROW
EXTERIOR DUCT TREATMENT*

FLEXIBLE DUCT
ELBOW TURN, SUPPLY DOWN. APPLIES TO RECT., ROUND AND OVAL 18"x12"
18"x12"
18"x12"
RECTANGULAR DUCT AND SIZE*
18"ø ROUND DUCT AND SIZE*
18"x12"
18"x12"
18"ø
18"x12"ø FLAT OVAL DUCT AND SIZE* 18"x12"ø
DUCT SECTION, SUPPLY AIR. SIZE* IS HORIZONTAL DIM. x VERTICAL DIM.

APPLIES TO RECT., ROUND AND OVAL 30"x12"
DUCT SECTION, OUTSIDE AIR. APPLIES TO RECT., ROUND AND OVAL DUCT SECTION, RETURN AIR. APPLIES TO RECT., ROUND AND OVAL DUCT SECTION, EXHAUST AIR. APPLIES TO RECT., ROUND AND OVAL ELBOW TURN, OUTSIDE AIR DOWN. APPLIES TO RECT., ROUND AND OVAL ELBOW TURN, RETURN DOWN. APPLIES TO RECT., ROUND AND OVAL ELBOW TURN, EXHAUST DOWN. APPLIES TO RECT., ROUND AND OVAL

CHANGE IN DUCT ELEVATION RISING IN DIRECTION INDICATED

CHANGE IN DUCT ELEVATION DROPPING IN DIRECTION INDICATED

END CAP
UP
DN

ELBOW, RECTANGULAR, SMOOTH RADIUS WITH SPLITTER VANES
(0.25 R/W DEFAULT)
ELBOW, RECTANGULAR, SMOOTH RADIUS WITHOUT VANES (1.5 R/W

DEFAULT)
ELBOW, ROUND, SMOOTH RADIUS (1.5 R/W DEFAULT)

MITERED ELBOW, RECTANGULAR, WITH TURNING VANES

RECTANGULAR TO ROUND TRANSITION
BDD

BACKDRAFT DAMPER

MANUAL DAMPER

MOTORIZED DAMPER

FIRE DAMPER

SMOKE DAMPER

SMOKE AND FIRE DAMPER

DUCT SILENCER

CONTROL DEVICE (REFER TO CONTROLS LEGEND)

AIR FLOW MEASURING STATION (REFER TO CONTROLS LEGEN D)
RECTANGULAR DIFFUSER, SUPPLY. OPTIONAL ARROWS
SHOW THE FLOW DIRECTION.

RECTANGULAR REGISTER OR GRILLE, RETURN

RECTANGULAR REGISTER OR GRILLE, EXHAUST

ROUND DIFFUSER, SUPPLY

LINEAR DIFFUSER

SIDEWALL REGISTER OR GRILLE, SUPPLY

SIDEWALL GRILLE, RETURN OR EXHAUST

UNDERCUT DOOR

DOOR GRILLE OR LOUVER

TRANSFER GRILLE OR LOUVER

COIL (REFER TO CONTROLS LEGEND)

EQUIPMENT TAG

AIR DEVICE TAG
M
X
ID-#
-
-

QUANTITY
TYPE
SIZE (-"X-")

AIRFLOW (CFM)
--
UC

PIPE INSULATION
2 1/2" PIPE SIZE

VENTILATION (HVAC)

HEATING WATER RETURN HWR

HEATING WATER SUPPLY HWS
-
-
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:00:59 PM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

GENERAL NOTES, SYMBOLS AND

LEGENDS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-002
NOTE: NOT ALL SYMBOLS, SYSTEMS, AND
ABBREVIATIONS MAY BE USED ON THIS PROJECT.

Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
DIVISION 23: HEATING, VENTILATING, AND AIR CONDITIO NING PART 1 - GENERAL INSTRUCTIONS

1.1 GENERAL REQUIREMENTS
A. ALL REQUIREMENTS UNDER DIVISION 01 AND THE GENER AL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS APPLY TO THIS SECTION AND DIVISION. WHERE THE REQUIREMENTS OF THIS SECTION AND DIVISION EXCEED THOSE OF DIVISION 01, THIS SECTION AND DIVISION TAKE PRECEDENCE. BECOME THOROUGHLY FAMILIAR WITH ALL ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION, SECTION, OR BOTH. WORK REQUIRED UNDER THIS DIVISION INCLUDES ALL MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION,

SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS, OR

REASONABLY INFERRED TO BE NECESSARY TO FACILITATE THE FUNCTION OF EACH SYSTEM AS IMPLIED BY THE DESIGN AND THE EQUIPMENT SPECIFIED.

B. THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND ANY PORTION OF WORK DESCRIBED IN ONE SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND REQUEST CLARIFICATION PRIOR TO

PROCEEDING WITH THE WORK INVOLVED
C. DRAWINGS ARE GRAPHIC REPRESENTATIONS OF THE WORK UPON WHICH THE CONTRACT IS BASED. THEY SHOW THE MATERIALS AND THEIR RELATIONSHIP TO ONE ANOTHER, INCLUDING SIZES, SHAPES, LOCATIONS, AND CONNECTIONS. THEY CONVEY THE SCOPE OF WORK,

INDICATING THE INTENDED GENERAL ARRANGEMENT OF THE SYSTEMS WITHOUT SHOWING ALL OF THE EXACT DETAILS AS TO ELEVATIONS, OFFSETS, CONTROL LINES, AND OTHER INSTALLATION REQUIREMENTS. USE THE DRAWINGS AS A GUIDE WHEN LAYING OUT THE WORK AND TO

VERIFY THAT MATERIALS AND EQUIPMENT WILL FIT INTO T HE DESIGNATED SFPACES, AND WHICH WHEN INSTALLED PER MANUFACTURERS' REQUIREMENTS, WILL ENSURE A COMPLETE, COORDINATED, SATISFACTORY, AND PROPERLY OPERATING SYSTEM.

1.2 DEFINITIONS
A. REFERENCES CONTAINED IN THIS SPECIFICATION FOLLO W THE NUMBERING SYSTEM DEFINED IN THE CONSTRUCTION SPECIFICATIONS INSTITUTE (CSI) MASTERFORMAT 2004 EDITION. SPECIFICATION DIVISIONS 01 THROUGH 13 PROVIDED WITH THIS PROJECT MAY REFERENCE THE CSI MASTERFORMAT 1995 EDITION. THE CORRESPONDING DIVISION REFERENCES BETWEEN THE 2004 EDITION AND 1995 EDITION ARE AS FOLLOWS:

1. 2004 EDITION
a. DIVISION 21 - FIRE SUPPRESSION
b. DIVISION 22 - PLUMBING
c. DIVISION 23 - HVAC
d. DIVISION 26 - ELECTRICAL
e. DIVISION 27 - COMMUNICATIONS
f. DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
B. FURNISH: TO SUPPLY AND DELIVER TO THE PROJECT SI TE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS.

C. INSTALL: TO PERFORM ALL OPERATIONS AT THE PROJEC T SITE INCLUDING, BUT NOT LIMITED TO, THE ACTUAL UNLOADING, UNPACKING,

ASSEMBLING, ERECTING, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTIN G, CLEANING, TESTING, COMMISSIONING, STARTING UP AND SIMILAR OPERATIONS, COMPLETE, AND READY FOR THE INTENDED USE.

D. PROVIDE: TO FURNISH AND INSTALL.

E. FURNISHED BY OWNER (OR OWNER-FURNISHED) OR FURNI SHED BY OTHERS: AN ITEM FURNISHED BY THE OWNER OR UNDER OTHER

DIVISIONS OR CONTRACTS, AND INSTALLED UNDER THE REQUIREMENTS OF THIS DIVISION, COMPLETE AND READY FOR INTENDED USE, INCLUDING ALL ITEMS AND SERVICES INCIDENTAL TO THE WORK NECESSARY FOR PROPER INSTALLATION AND OPERATION. INCLUDE THE INSTALLATION UNDER THE WARRANTY REQUIRED BY THIS DIVISION.

F. ENGINEER: WHERE REFERENCED IN THIS DIVISION, "EN GINEER" IS THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE

WORK UNDER THIS DIVISION, AND IS A CONSULTANT TO, AND AN AUTHORIZED REPRESENTATIVE OF THE ARCHITECT, AS DEFINED IN THE GENERAL AND/OR SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, ENGINEER MEANS INCREASED INVOLVEMENT BY AND OBLIGATIONS TO THE ENGINEER, IN ADDITION TO INVOLVE MENT BY AND OBLIGATIONS TO THE ARCHITECT.

G. AHJ: THE LOCAL CODE AND/OR INSPECTION AGENCY (AU THORITY) HAVING JURISDICTION OVER THE WORK.

H. CMATT: CERTIFIED ACCEPTANCE MECHANICAL TEST TECH NICIAN. A PROFESSIONAL CERTIFIED TO PERFORM ACCEPTANCE TESTS AND

COMPLETE THE DOCUMENTATION REQUIRED FOR NONRESIDENTIAL ACCEPTANCE TESTS AS REQUIRED BY THE CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS. TECHNICIAN SHALL BE CERTIFIED BY AN AUTHORIZED MECHANICAL ACCEPTANCE TEST TECHNICIAN CERTIFICATION PROVIDER. [SPECIFIER NOTE: INCLUDE THE FOLLOWING DEFINITIONS IF DESIGNING A PROJECT IN CALIFORNIA. ACCEPTANCE TESTING MUST BE PERFORMED BY A CERTIFIED (DISCIPLINE) ACCEPTANCE TEST TECHNICIAN. ACCEPTANCE TESTING IS DIFFERENT FROM COMMISSIONING.

ALL PROJECTS MUST BE ACCEPTANCE TESTED IN CALIFORNIA.]
I. NRTL: NATIONALLY RECOGNIZED TESTING LABORATORY, AS DEFINED AND LISTED BY OSHA IN 29 CFR 1910.7 (E.G., UL, ETL, CSA), AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. NATIONALLY RECOGNIZED TESTING LABORATORIES AND STANDARDS LISTED ARE USED ONLY

TO REPRESENT THE CHARACTERISTICS REQUIRED AND ARE NOT INTENDED TO RESTRICT THE USE OF OTHER NRTLS THAT ARE ACCEPTABLE TO THE AHJ AND STANDARDS THAT MEET THE SPECIFIED CRITERIA.

J. SUBSTITUTION: CHANGES IN PRODUCTS, MATERIALS, EQ UIPMENT, AND METHODS OF CONSTRUCTION FROM THOSE REQUIRED BY THE CONTRACT DOCUMENTS AND PROPOSED BY CONTRACTOR. SUBSTITUTIONS INCLUDE VALUE ENGINEERING PROPOSALS.

1. SUBSTITUTIONS FOR CAUSE: CHANGES PROPOSED BY CON TRACTOR THAT ARE REQUIRED DUE TO CHANGED PROJECT CONDITIONS, SUCH AS UNAVAILABILITY OF PRODUCT, REGULATORY CHANGES, OR UNAVAILABILITY OF REQUIRED WARRANTY TERMS.

2. SUBSTITUTIONS FOR CONVENIENCE: CHANGES PROPOSED BY CONTRACTOR OR OWNER THAT ARE NOT REQUIRED IN ORDER TO MEET OTHER PROJECT REQUIREMENTS BUT MAY OFFER ADVANTAGE TO CONTRACTOR OR OWNER.

K. THE TERMS "APPROVED EQUAL", "EQUIVALENT", OR "EQ UAL" ARE USED SYNONYMOUSLY AND SHALL MEAN ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED. THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY AN NRTL, AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT.

1.3 PREBID SITE VISIT
A. PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE P ROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO COMPLY WITH THIS REQUIREMENT SHALL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE.

B. KEEP PREMISES BROOM CLEAN OF FOREIGN MATERIAL CREATED DURING WORK PERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK.

C. PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS.

1.9 SUBSTITUTIONS
A. MATERIALS, PRODUCTS, EQUIPMENT, AND SYSTEMS DESC RIBED IN THE BIDDING DOCUMENTS ESTABLISH A STANDARD OF REQUIRED FUNCTION, DIMENSION, APPEARANCE AND QUALITY TO BE MET BY THE PROPOSED SUBSTITUTION. THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE DRAWINGS AND SPECIFICATIONS. TO REQUEST A SUBSTITUTION, REQUEST THE SUBSTITUTION REQUEST FORM FROM THE ARCHITECT OR ENGINEER. COMPLETE AND SEND THE SUBSTITUTION REQUEST FORM FOR EACH MATERIAL, PRODUCT, EQUIPMENT, OR SYSTEM THAT IS PROPOSED TO BE SUBSTITUTED. THE BURDEN OF PROOF O F THE MERIT OF THE PROPOSED SUBSTITUTION IS UPON THE PROPOSER.

B. UNLESS STATED OTHERWISE IN WRITING TO THE ENGINE ER BY THE CONTRACTOR, CONTRACTOR WARRANTS TO THE ENGINEER, ARCHITECT, AND OWNER THE FOLLOWING:

1. PROPOSED SUBSTITUTION HAS BEEN FULLY INVESTIGATE D AND DETERMINED TO MEET OR EXCEED THE SPECIFIED WORK IN ALL RESPECTS UNLESS STATED OTHERWISE IN THE SUBSTITUTION REQUEST.

2. PROPOSED SUBSTITUTION IS CONSISTENT WITH THE CON TRACT DOCUMENTS AND WILL PRODUCE INDICATED RESULTS, INCLUDING FUNCTIONAL CLEARANCES, MAINTENANCE SERVICE, AND SOURCING OF REPLACEMENT PARTS.

3. PROPOSED SUBSTITUTION HAS RECEIVED NECESSARY APP ROVALS OF AUTHORITIES HAVING JURISDICTION.

4. SAME WARRANTY WILL BE FURNISHED FOR PROPOSED SUB STITUTION AS FOR SPECIFIED WORK.

5. IF ACCEPTED SUBSTITUTION FAILS TO PERFORM AS REQ UIRED, CONTRACTOR SHALL REPLACE SUBSTITUTE MATERIAL OR SYSTEM WITH THAT ORIGINALLY SPECIFIED AND BEAR COSTS INCURRED THEREBY.

6. COORDINATION, INSTALLATION, AND CHANGES IN THE W ORK AS NECESSARY FOR ACCEPTED SUBSTITUTION WILL BE COMPLETE IN ALL RESPECTS.

C. NO SUBSTITUTIONS WILL BE CONSIDERED UNLESS THE S UBSTITUTION REQUEST FORM IS COMPLETED AND ATTACHED WITH THE APPROPRIATE SUBSTITUTION DOCUMENTATION. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ENGINEER AT LEAST TEN (10) CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS.

D. IF THE PROPOSED SUBSTITUTION IS APPROVED PRIOR T O RECEIPT OF BIDS, SUCH APPROVAL WILL BE STATED IN AN ADDENDUM. BIDDERS SHALL NOT RELY UPON APPROVALS MADE IN ANY OTHER WAY. VERBAL APPROVAL WILL NOT BE GIVEN. NO SUBSTITUTIONS WILL BE CONSIDERED AFTER THE CONTRACT IS AWARDED UNLESS SPECIFICALLY PROVIDED IN THE CONTRACT DOCUMENTS.

1.10 SUBMITTALS
A. ASSEMBLE AND SUBMIT FOR REVIEW SHOP DRAWINGS, MA TERIAL LISTS, MANUFACTURER PRODUCT LITERATURE FOR EQUIPMENT TO BE FURNISHED, AND ITEMS REQUIRING COORDINATION BETWEEN CONTRACTORS UNDER THIS CONTRACT. PROVIDE SUBMITTALS IN SUFFICIENT DETAIL SO AS TO DEMONSTRATE COMPLIANCE WITH THESE CONTRACT DOCUMENTS AND THE DESIGN CONCEPT. PRIOR TO TRANSMITTING

SUBMITTALS, VERIFY THAT THE EQUIPMENT SUBMITTED IS MUTUALLY COMPATIBLE AND SUITABLE FOR THE INTENDED USE, WILL FIT THE AVAILABLE SPACE, AND MAINTAIN MANUFACTURER RECOMMENDED SERVICE CLEARANCES. IF THE SIZE OF EQUIPMENT FURNISHED MAKES NECESSARY ANY CHANGE IN LOCATION OR CONFIGURATION, SUBMIT A SHOP DRAWING SHOWING THE PROPOSED LAYOUT.

B. TRANSMIT SUBMITTALS AS EARLY AS REQUIRED TO SUPP ORT THE PROJECT SCHEDULE. ALLOW FOR TWO WEEKS ENGINEER REVIEW TIME, PLUS TO/FROM MAILING TIME VIA THE ARCHITECT, PLUS A DUPLICATION OF THIS TIME FOR RESUBMITTAL, IF REQUI RED. ONLY RESUBMIT THOSE SECTIONS REQUESTED FOR RESUBMITTAL.

C. SUBMITTALS SHALL CONTAIN THE PROJECT NAME, APPLI CABLE SPECIFICATION SECTION, SUBMITTAL DATE, EQUIPMENT IDENTIFICATION ACRONYM AS USED ON THE DRAWINGS, AND THE CONTRACTORS STAMP. THE STAMP SHALL CERTIFY THAT THE SUBMITTAL HAS BEEN CHECKED BY THE CONTRACTOR, COMPLIES WITH THE DRAWINGS AND SPECIFICATIONS, AND IS COORDINATED WITH OTHER TRADES.

MANUFACTURER PRODUCT LITERATURE SHALL INCLUDE SHOP DRAWINGS, PRODUCT DATA, PERFORMANCE SHEETS, SAMPLES AND OTHER SUBMITTALS REQUIRED BY THIS DIVISION. HIGHLIGHT, MARK, LIST, OR INDICATE THE MATERIALS, PERFORMANCE CRITERIA, AND ACCESSORIES THAT ARE BEING PROPOSED. GENERAL PRODUCT CATALOG DATA NOT SPECIFICALLY NOTED TO BE PART OF THE SPECIFIED PRODUCT WILL BE REJECTED AND RETURNED WITHOUT REVIEW.

D. SUBMITTALS AND SHOP DRAWINGS SHALL NOT CONTAIN T HE FIRM NAME, LOGO, SEAL, OR SIGNATURE OF THE ENGIN EER. THEY SHALL NOT BE COPIES OF THE WORK PRODUCT OF THE ENGINEER. IF THE CONTRACTOR DESIRES TO USE ELEMENTS OF SUCH PRODUCT, REFER TO PARAGRAPH "ELECTRONIC DRAWING FILES" FOR PROCEDURES TO BE USED.

E. SEPARATE SUBMITTALS ACCORDING TO INDIVIDUAL SPEC IFICATION SECTIONS. ILLEGIBLE SUBMITTALS WILL BE REJECTED AND RETURNED WITHOUT REVIEW. CATALOG DATA SHALL BE PROPERLY BOUND, IDENTIFIED, INDEXED AND TABBED IN A 3-RING BINDER. EACH ITEM OR MODEL NUMBER SHALL BE CLEARLY MARKED AND ACCESSORIES INDICATED. LABEL THE CATALOG DATA WITH THE EQUIPMENT IDENTIFICATION

ACRONYM OR NUMBER AS USED ON THE DRAWINGS AND INCLUDE PERFORMANCE CURVES, CAPACITIES, SIZES, WEIGHTS, MATERIALS, FINISHES, WIRING DIAGRAMS, ELECTRICAL REQUIREMENTS AND DEVIATIONS FROM SPECIFIED EQUIPMENT OR MATERIALS. FOR EQUIPMENT WITH MOTOR STARTERS OR VFDS, INCLUDE SHORT CIRCUIT CURRENT RATINGS. MARK OUT INAPPLICABLE ITEMS. SHOP DRAWINGS WILL BE RETURNED WITHOUT REVIEW IF THE ABOVE-MENTIONED REQUIREMENTS ARE NOT MET.

F. PROVIDE THE QUANTITY OF SUBMITTALS REQUIRED BY D IVISION 01. IF NOT INDICATED AND HARD-COPY SETS ARE PROVIDED, SUBMIT A MINIMUM OF SIX (6) COPIES. REFER TO DIVISION 01 FOR ACCEPTANCE OF ELECTRONIC SUBMITTALS FOR THIS PROJECT. FOR ELECTRONIC SUBMITTALS, CONTRACTOR SHALL SUBMIT THE DOCUMENTS IN ACCORDANCE WITH THE PROCEDURES SPECIFIED IN DIVISION 01.

CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER THAT THE SUBMITTALS HAVE BEEN POSTED. IF ELECTRONIC SUBMITTAL PROCEDURES ARE NOT DEFINED IN DIVISION 01, CONTRACTOR SHALL INCLUDE THE WEBSITE, USER NAME, AND PASSWORD INFORMATION NEEDED TO ACCESS THE SUBMITTALS. FOR SUBMITTALS SENT BY E-MAIL, CONTRACTOR SHALL COPY THE DESIGNATED REPRESENTATIVES OF THE ARCHITECT AND ENGINEER. CONTRACTOR SHALL ALLOW FOR THE ENGINEER REVIEW TIME AS SPECIFIED ABOVE IN THE CONSTRUCTION SCHEDULE. CONTRACTOR SHALL SUBMIT ONLY THE DOCUMENTS REQUIRED TO PURCHASE THE MATERIALS AND/OR EQUIPMENT IN THE ELECTRONIC SUBMITTAL.

G. THE CHECKING AND SUBSEQUENT ACCEPTANCE OF SUBMIT TALS BY THE ENGINEER AND/OR ARCHITECT SHALL NOT RELIEVE THE

CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM THE DRAWINGS AND SPECIFICATIONS, ERRORS IN DIMENSIONS, DETAILS, SIZE OF MEMBERS, OR QUANTITIES, OMISSIONS OF COMPONENTS OR FITTINGS; COORDINATION OF ELECTRICAL REQUIREMENTS; AND NOT COORDINATING ITEMS WITH ACTUAL BUILDING CONDITIONS AND ADJACENT WORK. PROCEED WITH THE PROCUREMENT AND INSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SHOP DRAWINGS RELATIVE TO EACH ITEM.

1.11 RECORD DRAWINGS (AS-BUILT DRAWINGS)
A. DURING PROGRESS OF THE WORK IN THIS DIVISION, CO NTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE DURING THE INSTALLATION OF THE SYSTEM. UPON COMPLETION OF THE WORK, ACCURATELY TRANSFER ALL RECORD INFORMATION TO THREE IDENTICAL SETS OF THE APPROVED SHOP DRAWINGS. INSERT ONE SET INTO EACH COPY OF THE MANUAL DESCRIBED BELOW.

B. SEE DIVISION 01 AND GENERAL CONDITIONS FOR ADDIT IONAL INFORMATION.

1.4 MATERIAL AND WORKMANSHIP
A. PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS U NDER THIS CONTRACT UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS LISTED IN THE

SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS.

B. PIPE, PIPE FITTINGS, PIPE SPECIALTIES AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITED STATES OR CERTIFIED TO MEET THE SPECIFIED ASTM AND ANSI STANDARDS.

C. WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS.

INSTALLATIONS SHALL COMPLY WITH APPLICABLE CODES AND LAWS.

D. THE COMPLETE INSTALLATION SHALL FUNCTION AS DESI GNED AND INTENDED WITH RESPECT TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC.

ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS SHALL NOT BE ACCEPTABLE. MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL GRADE EQUIPMENT SHALL NOT BE ACCEPTED UNLESS OTHERWISE INDICATED.

E. REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING CARTONS, CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK.

F. REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DA MAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. PROVIDE ALL SAFETY LIGHTS, GUARDS, AND WARNING SIGNS REQUIRED FOR THE PERFORMANCE OF THE WORK AND FOR THE SAFETY OF THE PUBLIC.

1.5 MANUFACTURERS
A. IN OTHER ARTICLES WHERE LISTS OF MANUFACTURERS A RE INTRODUCED, SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE PRODUCTS BY ONE OF THE MANUFACTURERS SPECIFIED.

B. WHERE A LIST IS PROVIDED, MANUFACTURERS ARE LIST ED ALPHABETICALLY AND NOT IN ACCORDANCE WITH ANY RANKING OR PREFERENCE.

C. WHERE MANUFACTURERS ARE NOT LISTED, PROVIDE PROD UCTS SUBJECT TO COMPLIANCE WITH REQUIREMENTS FROM MANUFACTURERS THAT HAVE BEEN ACTIVELY INVOLVED IN MANUFACTURING THE SPECIFIED PRODUCT FOR NO LESS THAN 5 YEARS.

1.6 COORDINATION
A. COORDINATE WORK WITH THAT OF OTHER TRADES SO THA T THE VARIOUS COMPONENTS OF THE SYSTEMS ARE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER.

B. UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACT OR SHALL PROVIDE CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENINGS ARE REQUIRED. CONTRACTOR SHALL KEEP INFORMED AS TO THE WORK OF OTHER TRADES

ENGAGED IN THE CONSTRUCTION OF THE PROJECT AND SHALL EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES.

C. FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND INSPECTION.

D. PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY F IT THE TYPES OF CEILING, WALL, OR FLOOR FINISHES AC TUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM.

1.7 ORDINANCES AND CODES
A. WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A M INIMUM, BE IN CONFORMANCE WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE

IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ, INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE FOLLOWING:

1. NATIONAL ELECTRIC CODE (NEC)

2. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

3. UNDERWRITERS LABORATORIES (UL)

4. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (O SHA)

5. AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

6. AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE)

7. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

8. AMERICAN SOCIETY OF TESTING MATERIALS (ASTM)

9. OTHER NATIONAL STANDARDS AND CODES WHERE APPLICA BLE.

B. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREM ENTS OF THE REFERENCED CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. WHERE CONFLICTS BETWEEN VARIOUS CODES, ORDINANCES, RULES, AND REGULATIONS EXIST, COMPLY WITH THE MOST STRINGENT.

C. PROMPTLY BRING ALL CONFLICTS OBSERVED BETWEEN CO DES, ORDINANCES, RULES, REGULATIONS, REFERENCED STANDARDS, AND THESE DOCUMENTS TO THE ATTENTION OF THE ARCHITECT AND ENGINEER FOR FINAL RESOLUTION. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY VIOLATION OF THE LAW.

D. PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRE D FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR, AND FURNISH CERTIFICATES OF INSPECTION TO OWNER.

1.8 PROTECTION OF EQUIPMENT AND MATERIALS
A. STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATER IALS DELIVERED TO JOB SITE. FOR MATERIALS AND EQUIPMENT SUSCEPTIBLE TO CHANGING WEATHER CONDITIONS, DAMPNESS, OR TEMPERATURE VARIATIONS, STORE INSIDE IN CONDITIONED SPACES. FOR MATERIALS AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL DAMAGED BY

CONSTRUCTION ACTIVITIES SHALL BE REJECTED AND CONTRACTOR SHALL FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND AT HIS OWN EXPENSE.

1.12 WARRANTIES
A. WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGA INST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN, OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURERS STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION 01.

B. WARRANTIES SHALL INCLUDE LABOR AND MATERIAL, INC LUDING TRAVEL EXPENSES. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL COSTS TO THE OWNER, AND TO THE SATISFACTION OF THE OWNER, ARCHITECT, AND ENGINEER.

C. PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER OR OWNER.

D. AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER T O THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING

TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD AND ANY ACTIONS THE OWNER MUST TAKE IN ORDER TO MAINTAIN WARRANTY STATUS. EACH WARRANTY INSTRUMENT SHALL BE ADDRESSED TO THE OWNER AND STATE THE COMMENCEMENT DATE AND TERM.

PART 2 - GENERAL MATERIALS AND INSTALLATION

2.1 EXISTING EQUIPMENT REUSE AND REMOVAL
A. REMOVE ALL UNUSED EQUIPMENT, DUCTWORK, PIPING, A ND ASSOCIATED SUPPORTS. CAP DUCTWORK AND PIPING AT MAINS AND SEAL AIR AND WATER TIGHT.

B. PROVIDE ITEMS OF HVAC SYSTEMS MODIFICATION REQUI RED BECAUSE OF BUILDING REMODELING, AS NOTED ON THE DRAWINGS OR NECESSARY FOR PROPER OPERATION. MATCH EXISTING MATERIALS AND CONSTRUCTION TECHNIQUES WHEN MODIFYING EXISTING SYSTEMS UNLESS SPECIFIED OTHERWISE. COORDINATE ADDITIONAL REQUIREMENTS WITH GENERAL CONTRACTOR AND ARCHITECT.

C. SEAL AIRTIGHT EXISTING DUCTWORK REQUIRED TO BE A BANDONED IN PLACE OR NOT IN USE AT THE TERMINATION OF THE WORK.

D. CAP AND SEAL WEATHERTIGHT EXISTING ROOF CURBS AN D ROOF OPENINGS TO BE ABANDONED IN PLACE AS A RESULT OF EQUIPMENT REMOVAL.

E. CLEAN AND REBALANCE EXISTING DUCTWORK, DIFFUSERS , REGISTERS, AND GRILLES INTENDED FOR REUSE AS REQUIRED OR AS INDICATED ON DRAWINGS.

F. CLEAN AND REFURBISH EXISTING HVAC EQUIPMENT INTE NDED FOR REUSE AS REQUIRED FOR PROPER OPERATION INCLUDING REPLACEMENT OF FILTERS, BELTS, MOTORS, REMOTE CONTROLS, AND SAFETY INTERLOCKS.

2.2 SUPPORT SYSTEMS
A. STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT, DUCTWORK AND PIPING SHALL BE NEW, CLEAN, AND CONFORM TO ASTM DESIGNATION A-36.

B. SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, AND OTHER NON-STRUCTURAL ELEMENTS.

2.3 ACCESS DOORS
A. PROVIDE ACCESS DOORS FOR ALL CONCEALED EQUIPMENT WHERE INDICATED OR AS REQUIRED, EXCEPT WHERE ABOVE LAY-IN CEILINGS.

ACCESS DOORS SHALL BE ADEQUATELY SIZED FOR THE DEVICES SERVED WITH A MINIMUM SIZE OF 18 INCHES X 18 INCHES. ACCESS DOORS MUST BE OF THE PROPER CONSTRUCTION FOR TYPE O F CONSTRUCTION IN WHICH IT IS INSTALLED. OBTAIN ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION AND COLOR BEFORE O RDERING. PROVIDE FACTORY-FABRICATED AND ASSEMBLED UNITS, COMPLETE

WITH ATTACHMENT DEVICES AND FASTENERS READY FOR INSTALLATION, CONCEALED HINGES, FLUSH SCREWDRIVER-OPERATED CAM LOCK, AND ANCHOR STRAPS. PROVIDE ACCESS DOORS MANUFACTURED BY MILCOR, TITUS, ZURN, OR EQUAL.

2.4 PENETRATIONS
A. PROVIDE SLEEVES FOR PIPES PASSING THROUGH ABOVE GRADE CONCRETE OR MASONRY WALLS, CONCRETE FLOOR OR ROOF SLABS.

SLEEVES ARE NOT REQUIRED FOR CORE DRILLED HOLES IN EXISTING MASONRY WALLS, CONCRETE FLOORS OR ROOFS. PROVIDE 10 GAUGE GALVANIZED STEEL SLEEVES FOR SLEEVES 6 INCHES AND SMALLER. PROVIDE GALVANIZED SHEET METAL SLEEVES FOR LARGER THAN 6 INCHES. SCHEDULE 40 PVC SLEEVES ARE ACCEPTABLE FOR INSTALLATION IN AREAS WITHOUT RETURN AIR PLENUMS.

B. SEAL ELEVATED FLOOR, EXTERIOR WALL AND ROOF PENE TRATIONS WATERTIGHT AND WEATHERTIGHT WITH NON-SHRINK, NON-HARDENING COMMERCIAL SEALANT. PACK WITH MINERAL WOOL AND SEAL BOTH ENDS WITH MINIMUM OF 1/2 INCH OF SEALANT.

C. SEAL AROUND PENETRATIONS OF FIRE RATED ASSEMBLIE S. COORDINATE FIRE RATINGS AND LOCATIONS WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL SPECIFICATIONS FOR FIRE STOPPINGS. PROVIDE A PRODUCT SCHEDULE FOR UL LISTING, LOCATION, WALL OR FLOOR RATING AND INSTALLATION DRAWING FOR EACH PENETRATION FIRE STOP SYSTEM.

D. EXTEND PIPE INSULATION FOR INSULATED PIPE THROUG H FLOOR, WALL AND ROOF PENETRATIONS, INCLUDING FIRE RATED WALLS AND FLOORS. THE VAPOR BARRIER SHALL BE MAINTAINED. SIZE SLEEVE FOR A MINIMUM OF 1 INCH ANNULAR CLEAR SPACE BETWEEN INSIDE OF SLEEVE AND OUTSIDE OF INSULATION.

2.5 CONDENSATE DRAIN
A. INDIRECT AND CONDENSATE DRAIN INSIDE BUILDING: I NDIRECT AND CONDENSATE DRAIN PIPE INSTALLED INSIDE THE BUILDING SHALL BE TYPE "M" HARD COPPER WITH WROUGHT COPPER FITTINGS FOR 1” AND SMALLER AND “DWV” COPPER WITH WROUGHT COPPER DRAINAGE PATTERN FITTINGS FOR 1-1/4” AND LARGER HARD TEMPER COPPER TUBE AND SOLDERED CONNECTIONS MADE WITH 95/5 SOLDER. INSTALL CLEANOUTS AT ELBOWS GREATER THAN 45 DEGREES.

B. INDIRECT AND CONDENSATE DRAIN OUTSIDE BUILDING: INDIRECT AND CONDENSATE DRAIN PIPE INSTALLED OUTSIDE THE BUILDING ABOVE GROUND SHALL TYPE "M" FOR 1 INCH AND SMALLER AND “DWV” FOR 1-1/4 INCHES AND LARGER HARD TEMPER COPPER TUBE WITH WROUGHT COPPER DRAINAGE PATTERN FITTINGS AND SOLDERED CONNECTIONS MADE WITH 95/5 SOLDER. TERMINATE AT NEAREST ROOF DRAIN, GUTTER OR OTHER LOCATION AS SHOWN DRAWINGS. INSTALL CLEANOUTS AT ELBOWS GREATER THAN 45 DEGREES.

1.1 AIR DEVICES
A. PROVIDE AIR DEVICES AS SCHEDULED ON DRAWINGS, MAN UFACTURED BY PRICE, TITUS, NAILOR INDUSTRIES OR TUTTLE & BAILEY. SELECT AIR DEVICES TO LIMIT ROOM NOISE LEVEL TO NO HIGHER THAN NC-30 UNLESS OTHERWISE SHOWN. PROVIDE DEVICES WITH A SOFT PLASTIC GASKET TO MAKE AN AIRTIGHT SEAL AGAINST THE MOUNTING SURFACE. COORDINATE FINAL LOCATION, FRAME, AND MOUNTING T YPE OF AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS.

B. SUBMIT COMPLETE SHOP DRAWINGS INCLUDING INFORMATI ON ON NOISE LEVEL, PRESSURE DROP, THROW, CFM FOR EACH AIR DEVICE, STYLES, BORDERS, ETC. CLEARLY MARKED WITH SPECIFIED EQUIPMENT NUMBER. SUBMIT SAMPLES OF EACH AIR DEVICE AS REQUESTED BY THE ENGINEER.

C. PROVIDE WALL SUPPLY AIR REGISTERS WITH DOUBLE DEF LECTION BLADES AND OPPOSED BLADE DAMPERS. PROVIDE WALL RETURN AIR GRILLES AND EXHAUST AIR REGISTERS WITH HORIZONTAL 35 OR 45 DEGREE ANGLE VISION-PROOF BARS. PROVIDE CONCEALED FASTENERS FOR WALL MOUNTED REGISTERS AND GRILLES.

D. PROVIDE CEILING SUPPLY AIR REGISTERS OF ALUMINUM CURVED BLADE TYPE WITH BLADES PARALLEL TO LONG DIMENSION AND WITH THROW PATTERN AS INDICATED ON DRAWINGS. PROVIDE FLOOR SUPPLY AIR REGISTERS OF ALUMINUM HEAVY DUTY TYPE WITH 0 DEGREE DEFLECTION. PROVIDE OPPOSED BLADE DAMPERS FOR SUPPLY AIR REGISTERS AND EXHAUST AIR REGISTERS UNLESS INDICATED OTHERWISE.

E. PROVIDE CEILING MOUNTED AIR DEVICES OF LAY-IN OR SURFACE MOUNTED TYPE AS REQUIRED TO BE COMPATIBLE WITH CEILING CONSTRUCTION. PROVIDE CEILING DIFFUSERS AND GRILLES WITH WHITE ENAMEL FINISH UNLESS NOTED OTHERWISE.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:00 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL SPECIFICATIONS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-003
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

3.3 DUCTWORK
A. PROVIDE GALVANIZED STEEL DUCTWORK AND HOUSINGS A S SHOWN ON DRAWINGS. CONSTRUCT DUCTWORK INCLUDING FITTINGS AND TRANSITIONS IN CONFORMANCE WITH CURRENT SMACNA STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26-GAUGE SHEET METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30 INCHES WITH 1-1/4 INCH ANGLES NOT LESS THAN 5'-6" ON CENTERS, AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. SUPPO RT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8'-0". DO NOT SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWO RK.

COORDINATE ROUTING OF DUCTWORK WITH OTHER CONTRACTORS SUCH THAT PIPING, ELECTRICAL CONDUIT, AND ASSOCIATED SUPPORTS ARE NOT ROUTED THROUGH THE DUCTWORK.

B. PROVIDE MILL PHOSPHATIZED OR GALVANEALED FINISH FOR EXPOSED DUCTWORK TO BE FIELD PAINTED. SHOP TREATED SHEET METAL SHALL HAVE GALVANIZED METAL PRIMER APPLIED IN THE SHOP AFTER FABRICATION AND PRIOR TO SHIPPING.

C. SEAL DUCTWORK WITH HEAVY LIQUID SEALANT, HARDCAS T IRONGRIP 601, DESIGN POLYMER DP 1010 , UNITED MCGILL DUCT SEALER OR APPROVED EQUAL, APPLIED ACCORDING TO SEALANT MANUFACTURERS INSTRUCTIONS. SEAL ALL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT TO MEET SMACNA SEAL CLASS A. TAPES AND MASTICS SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A.

D. PROVIDE RADIUS ELBOWS, TURNS, AND OFFSETS WITH A MINIMUM CENTERLINE RADIUS OF 1-1/2 TIMES THE DUCT WIDTH. WHERE SPACE DOES NOT PERMIT FULL RADIUS ELBOWS, PROVIDE SHORT RADIUS ELBOWS WITH A MINIMUM OF TWO CONTINUOUS SPLITTER VANES. VANES SHALL BE THE ENTIRE LENGTH OF THE BEND. PROVIDE MITERED ELBOWS WHERE SPACE DOES NOT PERMIT RADIUS ELBOWS, WHERE SHOWN ON THE DRAWINGS, OR AT THE OPTION OF THE CONTRACTOR WITH THE ENGINEERS APPROVAL. MITERED ELBOWS LESS THAN 45 DEGREES SHALL NOT REQUIRE TURNING VANES. MITERED ELBOWS 45 DEGREES AND GREATER SHALL HAVE SINGLE THICKNESS TURNING VANES OF SAME GAUGE AS DUCTWORK, RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK. VANES FOR MITERED ELBOWS SHALL BE PROVIDED IN ALL SUPPLY AND EXHAUST DUCTWORK AND IN RETURN AND OUTSIDE AIR DUCTWORK THAT HAS AN AIR VELOCITY EXCEEDING 1000 FPM. DO NOT INSTALL VANES IN GREASE DUCTWORK.

E. DUCTS SHALL BE CONNECTED TO FANS, FAN CASINGS AN D FAN PLENUMS BY MEANS OF FLEXIBLE CONNECTORS. FLEXIBLE CONNECTORS SHALL BE NEOPRENE COATED GLASS CLOTH CANVAS CONNECTIONS, DURO-DYNE, ELGEN, VENTFABRIC OR EQUAL. FLEXIBLE CONNECTORS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED RATING NOT HIGHER THAN 50. MAKE AIRTIGHT JOINTS AND INSTALL WITH MINIMUM 1-1/2 INCHES SLACK.

F. PROVIDE BALANCING DAMPERS, MANUFACTURED BY CESCO , GREENHECK, LOUVERS & DAMPERS, NAILOR INDUSTRIES, POTTORFF, RUSKIN, TAMCO, OR APPROVED EQUAL, WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR COMPLETE CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS; PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. RECTANGULAR VOLUME DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE. ROUND VOLUME DAMPERS SHALL BE SINGLE-BLADE TYPE CONSISTING OF CIRCULAR BLADE MOUNTED TO A SHAFT.

G. ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, H ERCULES INDUSTRIES OR EQUAL, SHEETMETAL, WITH SMOOTH INTERIOR SURFACE, WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2 INCHES W.G.) ROUND DUCTWORK GAUGES PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN PRESSURES EXCEED 2 INCHES W.G.):

1. SIZE DUCT GAUGE FITTING GAUGE
H. LEWIS & LAMBERT, LINX INDUSTRIES LINDAB SAFE, OR APPROVED EQUAL FACTORY-MANUFACTURED ROUND DUCTWORK AND FITTINGS MAY BE SUBSTITUTED FOR SPECIFIED ROUND BRANCH DUCTWORK, AT CONTRACTORS OPTION. HEAVY LIQUID JOINT SEALANT MAY BE OMITTED ON FACTORY-MANUFACTURED ROUND DUCTWORK.

I. LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLU DING 2 INCHES W.G.) FITTINGS 24 INCHES IN DIAMETER AND LESS SHALL BE PREFABRICATED, SPOT-WELDED AND INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24 INCHES IN DIAMETER. FITTING GAUGE SHALL BE 22 GAUGE FOR 36 INCH FITTINGS AND UNDER, 20 GAUGE FOR LARGER SIZES. 90 DEGREE TEES SHALL BE CONICAL TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT WITH HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURERS INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN MEDIUM PRESSURE (DUCT PRESSURE CLASS 3 INCHES TO 6 INCHES W.G.) DUCTWORK AS RECOMMENDED BY SMACNA.

J. CONSTRUCT VAV PRIMARY SUPPLY AIR DUCTS (UPSTREAM OF TERMINAL BOXES) TO MEET SMACNA POSITIVE PRESSURE OF 4 INCHES W.G OF CONSTRUCT VAV SECONDARY SUPPLY AIR DUCTS (DOWNSTREAM OF TERMINAL BOXES) TO MEET SMACNA POSITIVE PRESSURE OF 2 INCHES W.G.

3.4 FLEXIBLE DUCT
A. LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLU DING 2 INCHES W.G.) AND MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1 INCH TO 6 INCHES W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8B, THERMAFLEX TYPE G-KM, M-KE, JPL TYPE SILVER JACKET, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, U.L.181 CLASS 1, ACOUSTICAL INSULATED DUCT, R-4.2 FIBERGLASS INSULATION. PROVIDE CPE LINER WITH STEEL WIRE HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER.

B. HIGH PRESSURE (DUCT PRESSURE CLASS OVER 6” W.G.) F LEXIBLE DUCT SHALL BE FLEXMASTER TYPE 4B, THERMAFLEX TYPE M-KC, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, UL181 CLASS 1, ACOUSTICAL INSULATED DUCT, STEEL WIRE HELIX CORE, MECHANICAL LOCK CONSTRUCTION, R-4.2 FIBERGLASS INSULATION. CONNECT EACH END WITH STAINLESS STEEL SCREW OPERATED METAL DRAW BANDS.

C. FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5 FEET IN LEN GTH, AND SHALL BE INSTALLED FULLY EXTENDED AND STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. INSTALL FLEX IBLE DUCT IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS. SUPPORT FLEXIBLE DUCT AT MAXIMUM 5 FEET ON CENTER AND WITHIN 6 INCHES OF BENDS. BENDS SHALL NOT EXCEED A CENTERLINE RADIUS OF ONE DUCT DIAMETER. DUCT SAG SHALL NOT EXCEED 1/2 INCH. SUPPORTING MATERIAL IN DIRECT CONTACT WITH THE DUCT SHALL NOT BE LESS THAN 1-1/2 INCHES IN WIDTH.

D. CONNECT FLEXIBLE DUCT TO RIGID METAL DUCT OR AIR DEVICES AS RECOMMENDED BY THE MANUFACTURER. AT A MINIMUM, INSTALL TWO WRAPS OF DUCT TAPE AROUND THE INNER CORE CONNECTION AND A METALLIC OR NON-METALLIC CLAMP OVER THE TAPE AND TWO WRAPS OF DUCT TAPE OR A CLAMP OVER THE OUTER JACKET. DUCT CLAMPS SHALL BE LABELED IN ACCORDANCE WITH UL-181B AND MARKED 181B-C. DUCT TAPE SHALL BE LABELED IN ACCORDANCE WITH UL 181B AND MARKED 181B-FX.

3.5 ROOFTOP UNITS (HEAT PUMP) 3-20
A. PROVIDE PACKAGE ROOFTOP HEAT PUMP UNITS AS SCHED ULED ON THE DRAWINGS, MANUFACTURED BY AAON, CARRIER, DAIKIN, JOHNSON CONTROLS, TRANE, OR YORK, COMPLETE

WITH FACTORY INSTALLED DIRECT-DRIVE HERMETIC COMPRESSORS WITH INTERNAL SPRING VIBRATION ISOLATION, BUILT-IN MOTOR THERMAL OVERLOAD PROTECTION, CRANKCASE HEATER, AND LOW PRESSURE SWITCHES; DIRECT EXPANSION EVAPORATING AND CONDENSING COILS, MINIMUM SEER OR EER RATING (COOLING) AND MINIMUM HSPF OR COP RATING (HEATING) AS REQUIRED BY THE APPLICABLE ENERGY CODE OR GREATER IF SCHEDULED ON THE DRAWINGS; CENTRIFUGAL EVAPORATOR BLOWER; AIR FILTER RACK WITH 2 INCH THICK THROWAWAY FILTERS; PROPELLER TYPE CONDENSER FAN; COMPLETE FACTORY INSTALLED MICRO-PROCESSOR CONTROLS INCLUDING ANTI-SHORT CYCLE TIMERS, TIME DELAY RELAYS AND MINIMUM ON TIME CONTROLS; BUILT-IN THERMAL OVERLOAD PROTECTION ON MOTORS AND COMPRESSORS; REVERSING VALVE, SUCTION LINE ACCUMULATOR, FLOW CONTROL CHECK VALVE, AND SOLID STATE DEFROST CONTROL UTILIZING THERMISTORS; OUTDOOR AIR DAMPER; BAROMETRIC RELIEF DAMPER, POWER RELIEF FAN, WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL WITH WEATHER-RESISTANT BAKED ENAMEL FINISH; MINIMUM INSULATED DOWNFLOW STANDARD ROOF CURB WITH MINIMUM HEIGHT OF 12 INCHES FOR ROOFS WITH NO INSULATION, 14 INCHES FOR ROOFS WITH INSULATION OR AS SCHEDULED ON THE DRAWINGS; SINGLE POINT ELECTRICAL POWER CONNECTION. PROVIDE SLOPED ROOF CURB AS REQUIRED TO MATCH SLOPE OF ROOF STRUCTURE SO THAT UNIT IS INSTALLED LEVEL. PROVIDE GUARDS OR LOUVERED PANELS TO PROTECT THE CONDENSER COIL FROM HAIL OR OTHER DAMAGE. PROVIDE A 125 VAC, 20 AMP DUPLEX CONVENIENCE RECEPTACLE MOUNTED TO UNIT READY FOR FIELD WIRING WITH A COVER UL LISTED FOR WET AND DAMP LOCATIONS WHEN IN USE. PROVIDE HONEYWELL OR EQUAL ELECTRONIC PROGRAMMABLE TYPE THERMOSTAT. PROVIDE UNIT COMPLETE WITH MANUFACTURER'S ONE YEAR GUARANTEE ON COMPONENTS PLUS AN ADDITIONAL FOUR YEAR GUARANTEE ON THE COMPRESSORS.

FOR UNITS EQUIPPED WITH AN ECONOMIZER ASSEMBLY, THE ASSEMBLY SHALL BE COVERED WITH MINIMUM 5 YEAR MANUFACTURER WARRANTY, CERTIFIED TO OPERATE THROUGH 60,000 DAMPER OPENING AND CLOSING CYCLES, AND CERTIFIED TO MEET LEAKAGE REQUIREMENTS SPECIFIED UNDER THE SECTION.

3.5 VAV BOXES
PROVIDE ENVIRONMENTAL TECHNOLOGIES INC., JOHNSON CONTROLS, KREUGER, PRICE INDUSTRIES, TITUS OR TRANE SINGLE DUCT, VARIABLE AIR VOLUME TERMINAL OF SIZES AND CAPACITIES SHOWN ON DRAWINGS.

CONSTRUCT CASING OF 22 GAUGE ZINC COATED STEEL, INTERNALLY LINED WITH MINIMUM R-3.5 FIBERGLASS LINER HAVING MINIMUM R-3.5 VALUE AND COMPLYING WITH UL 181 AND NFPA-90A. FULLY COVER EDGES OF INSULATION WITH METAL COVER STRIPS. PROVIDE REMOVABLE ACCESS PANELS WITH AIRTIGHT GASKETS AND QUARTER-TURN LATCHES FOR ACCESS TO INTERNAL BOX COMPONENTS REQUIRING SERVICE.

CONSTRUCT THE DAMPER BLADE OF HEAVY GAUGE STEEL WITH SHAFT ROTATING IN DELRIN OR BRONZE OILITE SELF-LUBRICATING BEARINGS. DAMPER BLADES SHALL SEAT AGAINST GASKETED STOPS TO LIMIT LEAKAGE IN FULL CLOSED POSITION TO 10 PERCENT OF RATED AIRFLOW WHEN SUBJECTED TO 6 INCHES STATIC PRESSURE.

PROVIDE PRESSURE INDEPENDENT DIRECT DIGITAL CONTROLS FOR THE CONTROL SEQUENCE SPECIFIED IN THE SCHEDULE AND CONTROL DIAGRAM. AIR FLOW SENSORS SHALL BE CROSS CONFIGURATION WITH A MINIMUM OF 12 PICK-UP POINTS.

PROVIDE WITH ONE OR TWO ROW HOT WATER COILS THAT ARE CONSTRUCTED OF COPPER TUBES AND ALUMINUM FINS WITH GALVANIZED STEEL CASING. PROVIDE NEMA 1 CONTROL PANEL, ALUMINIZED OR GALVANIZED STEEL FRAME, AIRFLOW SWITCH, THERMAL OVERLOAD PROTECTION AND MAGNETIC CONTACTORS.

THE STATIC PRESSURE DROP SHALL NOT EXCEED 0.35 INCHES WG AT THE SCHEDULED MAXIMUM AIR FLOW AND THE NOISE CRITERIA DISCHARGE SHALL NOT EXCEED 30 AT A DIFFERENTIAL STATIC PRESSURE OF 0.15 INCHES INCLUDING ROOM AND CEILING EFFECTS.

3.6 HYDRONIC PIPING AND INSULATION
A. FOR 2 INCHES AND SMALLER, PROVIDE HYDRONIC PIPING OF TYPE ‘L’ HARD COPPER, ASTM B-88 WITH WROUGHT COPPER FITTINGS, ANSI B16.22 WITH SOLDER JOINTS. INSTALL DIELECTRIC UNIONS WHEREVER DISSIMILAR PIPING IS JOINED. AT CONTRACTORS OPTION, SCHEDULE 40, ASTM A 53, GRADE B, BLACK STEEL WITH WELDED OR SCREWED FITTINGS MAY BE USED. FOR 2-1/2 INCHES AND LARGER, PROVIDE ASTM A53, GRADE B, SCHEDULE 40, BLACK STEEL PIPING WITH WELDED JOINTS AND FITTINGS.

B. INSTALL PIPING PARALLEL TO THE BUILDING LINES UNL ESS INDICATED OTHERWISE. SUPPORT AND ANCHOR PIPING AS REQUIRED TO FACILITATE EXPANSION AND CONTRACTION, AND TO PREVENT THE TRANSMISSION OF NOISE AND VIBRATION.

E. PROVIDE PREFABRICATED ROOF CURB SPECIFIED ON THE EQUIPMENT SCHEDULE. COORDINATE WITH MANUFACTURER ON INSTALLATION.

F. PROVIDE BOX FRAMES FOR RECTANGULAR OPENINGS WELDE D 12-GAUGE GALVANIZED STEEL ATTACHED TO FORMS AND OF A MAXIMUM DIMENSION ESTABLISHED BY THE ARCHITECT. NOTIFY THE GENERAL CONTRACTOR OR ARCHITECT BEFORE INSTALLING ANY BOX OPENINGS NOT SHOWN ON THE ARCHITECTURAL OR STRUCTURAL DRAWINGS.

G. SEAL CONCRETE OR MASONRY EXTERIOR WALL PENETRATIO NS BELOW GRADE WITH "WALL PIPES" AND MECHANICAL SLEEVE SEALS. PROVIDE CAST IRON "WALL PIPES" WITH INTEGRAL WATERSTOP RING MANUFACTURED BY JAY R. SMITH, JOSAM, WADE, WATTS OR ZURN. PROVIDE MODULAR MECHANICAL SLEEVE SEALS, MANUFACTURED BY CALPICO, METRAFLEX, OR THUNDERLINE / LINK SEAL.

H. SEAL ELEVATED CONCRETE SLAB WITH WATER PROOF MEMB RANE PENETRATIONS WITH "WALL PIPES" AND WATER PROOF SEALANT. SECURE WATERPROOF MEMBRANE FLASHING BETWEEN "WALL PIPES" CLAMPING FLANGE AND CLAMPING RING. PROVIDE CAST IRON "WALL PIPES" WITH INTEGRAL WATERSTOP RING MANUFACTURED BY JAY R.

SMITH, JOSAM, WADE, WATTS OR ZURN.

I. PROVIDE SLEEVES FOR HORIZONTAL PIPE PASSING THROU GH OR UNDER FOUNDATION. SLEEVES SHALL BE CAST IRON SOIL PIPE TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED.

J. PROVIDE SCHEDULE 40 PVC PIPE SLEEVES FOR VERTICAL PRESSURE PIPE PASSING THROUGH CONCRETE SLAB ON GRADE. SLEEVES SHALL BE ONE NOMINAL PIPE SIZE LARGER THAN THE PIPE SERVED AND TWO PIPE SIZES LARGER THAN PIPE SERVED FOR DUCTILE IRON PIPES WITH RESTRAINING RODS. SEAL WATER-TIGHT WITH SILICONE CAULK.

K. PROVIDE 1/2 INCH THICK CELLULAR FOAM INSULATION A ROUND PERIMETER OF NON-PRESSURE PIPE PASSING THRU CONCRETE SLAB ON GRADE. INSULATION SHALL EXTEND TO 2 INCHES ABOVE AND BELOW THE CONCRETE SLAB.

2.6 FIRESTOPPING
A. SEALANTS AND ACCESSORIES SHALL HAVE FIRE-RESISTA NCE RATINGS INDICATED, AS ESTABLISHED BY TESTING IDENTICAL ASSEMBLIES IN ACCORDANCE WITH UL 2079 OR ASTM E 814, OR OTHER NRTL ACCEPTABLE TO AHJ.

B. MANUFACTURERS: HILTI, RECTORSEAL, SPECIFIED TECH NOLOGIES INC., UNITED STATES GYPSUM COMPANY, OR 3M CORP.

C. THROUGH AND MEMBRANE PENETRATION FIRESTOPPING SY STEMS PRODUCT SCHEDULE: PROVIDE UL LISTING, LOCATION, WALL OR FLOOR RATING, AND INSTALLATION DRAWING FOR EACH PENETRATION FIRE STOP SYSTEM.

D. WHERE PROJECT CONDITIONS REQUIRE MODIFICATION TO QUALIFIED TESTING AND INSPECTING AGENCYS ILLUSTRATIONS FOR A PARTICULAR FIRESTOPPING CONDITION,

SUBMIT ILLUSTRATION, WITH MODIFICATIONS MARKED, APPROVED BY PENETRATION FIRESTOPPING MANUFACTURERS FIRE-PROTECTION ENGINEER AS AN ENGINEERING JUDGMENT OR EQUIVALENT FIRE-RESISTANCE-RATED ASSEMBLY. INCLUDE QUALIFICATIONS DATA FOR TESTING AGENCY.

2.7 EQUIPMENT FURNISHED BY OTHERS
A. PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR OWNER TO COMPLETE INSTALLATION OF EQUIPMENT FURNISHED BY OTHERS IN LOCATIONS AS INDICATED ON THE DRAWINGS, SPECIFIED HEREIN, OR BOTH. EQUIPMENT AND ACCESSORIES NOT PROVIDED BY THE EQUIPMENT

SUPPLIER MAY INCLUDE, BUT NOT BE LIMITED TO FLUES, VENTS, INTAKES, ASSOCIATED ROOF JACKS AND CAPS TO O UTDOORS, DAMPERS, IN-LINE FANS, ROOF FANS, AND CONTROL INTERLOCKS, ETC. AS REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS.

B. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUG H-IN DIMENSIONS AND SHALL VERIFY THEM WITH ARCHITECT AND/OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS.

2.8 SYSTEM TESTING AND ADJUSTING
A. UPON COMPLETION OF EACH PHASE OF THE INSTALLATIO N, TEST EACH SYSTEM IN CONFORMANCE WITH LOCAL CODE REQUIREMENTS AND AS NOTED BELOW. FURNISH LABOR AND EQUIPMENT REQUIRED TO TEST EACH SYSTEM INSTALLED UNDER THIS CONTRACT. ASSUME ALL COSTS INVOLVED IN MAKING THE TESTS AND REPAIRING AND/OR REPLACING ANY DAMAGES RESULTING THEREFROM.

B. FINAL SYSTEM TESTING, BALANCING AND ADJUSTMENTS (TAB) SHALL BE PERFORMED BY A CONTRACTOR CERTIFIED BY THE OR TESTING, ADJUSTING AND BALANCING BUREAU (TABB). TAB SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT EDITION OF THE CERTIFIED AGENCIES PROCEDURAL STANDARD FOR TESTING, ADJUSTING AND BALANCING AND SHALL COMPLY WITH THE STRICTEST INTERPRETATION OF THAT STANDARD FOR EXECUTION AND REPORTING OF ALL TAB WORK.

C. TAB CONTRACTOR SHALL BE RESPONSIBLE TO CALIBRATE , SET, AND ADJUST AUTOMATIC TEMPERATURE CONTROL SENSORS, ACTUATORS AND CONTROL DEVICES. CHECK

PROPER SEQUENCING OF INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS, ADJUST THERMOSTATS, AND CONT ROL SETPOINTS, LIMITS AND TIME BASED ADJUSTMENT TO OPERATE IN ACCORDANCE WITH THE PERFORMANCE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS. ADJUST PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT ADJU STMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. CALIBRATE, SET, AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS.

D. DIVISION 23 CONTRACTOR SHALL ALIGN BEARINGS AND REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT ADDITIONAL COST TO THE OWNER.

2.9 SEISMIC CONTROLS FOR MEPF SYSTEMS
A. SEISMIC PROTECTION CRITERIA:

1. RISK/OCCUPANCY CATEGORY: I

2. SITE SOIL CATEGORY: CONTRACTOR'S SEISMIC ENGINEER TO DETERMINE

3. SEISMIC DESIGN CATEGORY: CONTRACTOR'S SEISMIC ENG INEER TO DETERMINE

4. COMPONENT IMPORTANCE FACTOR: DETERMINED FROM ASCE 7-2010.

B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMIN ING THE REQUIREMENTS FOR SEISMIC BRACING OF MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS. SEISMIC

PROTECTION CRITERIA USED TO DETERMINE SEISMIC BRACING REQUIREMENTS OF ALL MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS SHALL BE DETERMINED BY THE APPLICABLE CODE ADOPTED IN THE PROJECT JURISDICTION. WHERE NOT ALREADY DETERMINED WITHIN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR CONTRACTING A LICENSED PROFESSIONAL ENGINEER TO ESTABLISH BUILDING SITE CLASS, SEISMIC DESIGN CATEGORY, SEISMIC ZONE, OR ANY OTHER CRITERIA NECESSARY TO DETERMINE THE REQUIREMENTS FOR SEISMIC BRACING ON MECHANICAL, ELECTRICAL, AND/OR PLUMBING SYSTEMS.

C. SEISMIC BRACING OF FIRE PROTECTION SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE PROVISIONS OF NFPA 13 (2010 OR LATER EDITION).

D. THE CONTRACTOR SHALL DETERMINE THE TYPE AND LOCA TION OF SEISMIC BRACING REQUIRED FOR THE MECHANICAL, ELECTRICAL, AND PLUMBING ELEMENTS SHOWN ON THE

DRAWINGS BASED ON THE ESTABLISHED SEISMIC CRITERIA, THE SIZE AND WEIGHT OF THE SUPPORTED ELEMENT, AND THE DISTANCE FROM STRUCTURE OF THE SUPPORTED ELEMENT.

E. THE CONTRACTOR SHALL SUBMIT THE FOLLOWING SHOP DR AWING INFORMATION TO THE AHJ AND THE ENGINEER FOR R EVIEW AND APPROVAL:

1. SEISMIC ANALYSIS LISTING ALL APPLICABLE SEISMIC D ESIGN CRITERIA.

2. DESCRIPTIVE CATALOG DATA OF SEISMIC BRACING MATER IALS.

3. SHOP DRAWINGS SHOWING BRACING TYPE AND LOCATION.

4. INSTALLATION DETAILS OF ALL BRACING USED.

5. CALCULATIONS SHOWING THAT THE SEISMIC RESTRAINTS MEET THE SEISMIC REQUIREMENTS.

F. SHOP DRAWINGS AND CALCULATIONS SHALL BE SIGNED AN D SEALED BY A REGISTERED PROFESSIONAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT AND EMPLOYED BY THE MANUFACTURER OF THE SEISMIC BRACING PRODUCTS. CALCULATIONS SHALL INCLUDE DEAD LOADS, STATIC SEISMIC LOADS, AND CAPACITY OF MATERIALS UTILIZED FOR CONNECTIONS.

G. SEISMIC BRACING, RESTRAINTS, ISOLATORS, AND ISOLA TION MATERIALS SHALL BE OF THE SAME MANUFACTURER AND SHALL BE CERTIFIED BY THE MANUFACTURER. APPROVED MANUFACTURERS ARE: AMBER/BOOTH COMPANY, INC., B-LINE/TOLCO, ISAT, KINETICS NOISE CONTROL, INC., LOOS & COMPANY, INC., MASON INDUSTRIES, INC., UNI-STRUT, OR VIBRO-ACOUSTICS. EACH DEVICE SHALL HAVE A PRE-APPROVAL NUMBER FROM CALIFORNIA OSHPD OR OTHER RECOGNIZED GOVERNMENT AGENCY SHOWING MAXIMUM RESTRAINT RATINGS.

H. SEISMIC BRACING MEASURES TO BE APPLIED TO MECHANI CAL, ELECTRICAL, AND PLUMBING EQUIPMENT/SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND/OR FEDERAL CODES AS WELL AS MANUFACTURER’S REQUIREMENTS. THE MOST STRINGENT CRITERIA SHALL APPLY. ALL ANCHOR CONNECTIONS TO STRUCTURE FOR SUPPORT OF MECHANICAL AND ELECTRICAL EQUIPMENT, REGARDLESS OF THE NEED FOR SEISMIC RESTRAINTS, SHALL BE SHOWN ON SHOP DRAWINGS. 14" & UNDER 26 24
15" THRU 26" 24 22
28" THRU 36" 22 20
38" THRU 50" 20 20
52" THRU 60" 18 18
D. THE CONTRACTOR SHALL SUBMIT THE FOLLOWING SHOP DR AWING INFORMATION TO THE AHJ AND THE ENGINEER FOR R EVIEW AND APPROVAL:

1. SEISMIC ANALYSIS LISTING ALL APPLICABLE SEISMIC DESIGN CRITERIA.

2. DESCRIPTIVE CATALOG DATA OF SEISMIC BRACING MATE RIALS.

3. SHOP DRAWINGS SHOWING BRACING TYPE AND LOCATION.

4. INSTALLATION DETAILS OF ALL BRACING USED.

5. CALCULATIONS SHOWING THAT THE SEISMIC RESTRAINTS MEET THE SEISMIC REQUIREMENTS.

E. SHOP DRAWINGS AND CALCULATIONS SHALL BE SIGNED AN D SEALED BY A REGISTERED PROFESSIONAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT AND EMPLOYED BY THE MANUFACTURER OF THE SEISMIC BRACING PRODUCTS. CALCULATIONS SHALL INCLUDE DEAD LOADS, STATIC SEISMIC LOADS, AND CAPACITY OF MATERIALS UTILIZED FOR CONNECTIONS.

F. SEISMIC BRACING, RESTRAINTS, ISOLATORS, AND ISOLA TION MATERIALS SHALL BE OF THE SAME MANUFACTURER AND SHALL BE CERTIFIED BY THE MANUFACTURER. APPROVED MANUFACTURERS ARE: AMBER/BOOTH COMPANY, INC., B-LINE/TOLCO, ISAT, KINETICS NOISE CONTROL, INC., LOOS & COMPANY, INC., MASON INDUSTRIES, INC., UNI-STRUT, OR VIBRO- ACOUSTICS. EACH DEVICE SHALL HAVE A PRE-APPRO VAL NUMBER FROM CALIFORNIA OSHPD OR OTHER RECOGNIZED GOVERNMENT AGENCY SHOWING MAXIMUM.

A. SEISMIC BRACING MEASURES TO BE APPLIED TO MECHAN ICAL, ELECTRICAL, AND PLUMBING EQUIPMENT/SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND/OR FEDERAL CODES AS WELL AS MANUFACTURERS REQUIREMENTS. THE MOST STRINGENT CRITERIA SHALL APPLY. ALL ANCHOR CONNECTIONS TO STRUCTURE FOR SUPPORT OF MECHANICAL AND ELECTRICAL EQUIPMENT, REGARDLESS OF THE NEED FOR SEISMIC RESTRAINTS, SHALL BE SHOWN ON SHOP DRAWINGS.

2.10 AIR FILTERS
A. PROVIDE FARR 30/30, PLEATED, THROWAWAY TYPE FILT ERS, OR SIMILAR AS MANUFACTURED BY AIR FILTER, INC., AMERICAN AIR FILTER, FLANDERS, OR APPROVED EQUAL, UNLESS OTHERWISE INDICATED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED BEFORE FINAL ACCEPTANCE.

B. IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTIO N PERIOD, CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT IS STARTED AND REPLACE FILTERS WHEN NEEDED, BUT NOT LESS THAN EVERY MONTH. ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF FILTERS IN THE UNIT.

2.11 IDENTIFICATION
A. PROVIDE MANUFACTURER'S STANDARD PRE-PRINTED, SEM I-RIGID SNAP-ON OR PERMANENT ADHESIVE, PRESSURE-SENSITIVE VINYL PIPE MARKERS. COLOR CODE PIPE MARKERS TO COMPLY WITH ANSI A13.1.

B. INSTALL PIPE MARKERS ON EACH HVAC PIPING SYSTEM AND INCLUDE ARROWS TO SHOW NORMAL DIRECTION OF FLOW.

C. LOCATE PIPE MARKERS AND COLOR BANDS WHEREVER PIPI NG IS EXPOSED TO VIEW IN OCCUPIED SPACES, MACHINE ROOMS, ACCESSIBLE MAINTENANCE SPACES (SHAFTS, TUNNELS, PLENUMS) AND EXTERIOR NON-CONCEALED LOCATIONS.

D. PROVIDE PLASTIC LAMINATE OR BRASS VALVE TAG ON EV ERY VALVE, COCK AND CONTROL DEVICE IN EACH HVAC PIPING SYSTEM; EXCLUDE CHECK VALVES, VALVES WITHIN FACTORY- FABRICATED EQUIPMENT UNITS, AND SHUT-OFF VALVES AT HVAC TERMINAL DEVICES AND SIMILAR ROUGH-IN CONNECTIONS OF END-USE FIXTURES AND UNITS.

E. PROVIDE MANUFACTURER’S STANDARD LAMINATED PLASTIC , COLOR CODED EQUIPMENT MARKERS. CONFORM TO THE FOL LOWING COLOR CODE: GREEN FOR COOLING; YELLOW FOR HEATING; YELLOW/GREEN FOR COMBINATION COOLING AND HEATING; BROWN FOR ENERGY RECLAMATION; BLUE FOR OTHER EQUIPMENT TYPES. CONFORM TO ANSI A13.1 FOR HAZARDOUS EQUIPMENT.

F. PROVIDE STENCILED SIGNS FOR EQUIPMENT IDENTIFICAT ION AT CONTRACTOR’S OPTION OR WHERE DISTANCE OF REQUIRED IDENTIFICATION REQUIRES LETTERING LARGER THAN 1 INCH HEIGHT. STENCIL PAINT SHALL BE EXTERIOR TYPE, OIL-BASED, ALKYD ENAMEL, MINIMUM 1-1/4 INCH HEIGHT OR GREATER AS REQUIRED FOR LONG DISTANCE IDENTIFICATION, WHITE OR BLACK COLOR FOR BEST CONTRAST.

G. PROVIDE DUCT MARKERS OR PROVIDE STENCILED SIGNS A ND ARROWS INDICATING DUCTWORK SERVICE AND FLOW DIRECTION IN BLACK OR WHITE LETTERING FOR BEST CONTRAST WITH DUCT OR INSULATION COLOR. LOCATE MARKERS MAXIMUM 50 FEET ALONG EACH DUCT SIDE AND WITHIN 5 FEET OF ALL CONTROL AND BALANCING DAMPERS OR BRANCH DUCTS MORE THAN 25 FEET LENGTH AND WITHIN 5 FEET ON EACH SIDE OF WALL, FLOOR, AND CEILING PENETRATIONS. PROVIDE ADDITIONAL MARKERS IN CONGESTED AREAS OR AT MULTIPLE DUCT RUNS AS REQUIRED FOR CLARITY.

PART 3 - DUCT INSULATION, DUCTWORK, ACCESSORIES, FLUES AND FANS

3.1 DUCT INSULATION
A. COVER CONCEALED, RIGID DUCTWORK WITH ASTM C553, T YPE II FLEXIBLE FIBERGLASS INSULATION. INSTALLED INSULATION SHALL BE 1-1/2 INCH THICK, 3/4 POUND DENSITY, MINIMUM R-4.2 DUCT WRAP, CERTAINTEED OR EQUIVALENT JOHNS MANVILLE, OWENS-CORNING, OR KNAUF WITH HEAVY-DUTY FOIL-SCRIM-KRAFT FACING, AND WITH JOINTS TAPED WITH 3 INCH WIDE FOIL TAPE AS FOLLOWS :

1. ROUND AND RECTANGULAR SUPPLY AND RETURN AIR DUCTW ORK.

2. ROUND AND RECTANGULAR OUTSIDE AIR DUCTWORK.

3. ROUND AND RECTANGULAR EXHAUST AND RELIEF AIR DUCT WORK WITHIN 10 FEET OF EXTERIOR DISCHARGE.

B. FOR SUPPLY AND RETURN DUCTWORK LOCATED EXTERIOR T O THE BUILDING, INSULATION SHALL BE MINIMUM R-8.0. PROVIDE INSULATION AND JACKET IN ACCORDANCE WITH ONE OF THE FOLLOWING THREE OPTIONS:

1. EXTERIOR INSULATION AND JACKET CONSISTING OF 2 IN CH THICKNESS OF ARMATUFF FLEXIBLE ELASTOMERIC INSULATION OR EQUIVALENT MEETING ASTM C534 WITH INTEGRAL 12 MILS THICK UV RESISTANT CLADDING LAMINATED AT FACTORY. COVER ALL SEAMS WITH ARMATUFF SEAL TAPE.

2. EXTERIOR INSULATION CONSISTING OF 2 INCH THICKNES S OF FLEXIBLE ELASTOMERIC INSULATION MEETING ASTM C534 OR 3 LB DENSITY RIGID FIBERGLASS MEETING ASTM C612, AND JACKET CONSISTING OF 20 GAUGE CORRUGATED ALUMINUM JACKET WITH ALUMINUM FITTING COVERS AND MINIMUM THREE ALUMINUM ATTACHMENT BANDS PER SECTION.

3. EXTERIOR INSULATION CONSISTING OF 2 INCH THICKNES S OF FLEXIBLE ELASTOMERIC INSULATION MEETING ASTM C534 OR 3 LB DENSITY RIGID FIBERGLASS MEETING ASTM C612, AND JACKET CONSISTING OF 15.5 MILS THICK VENTURECLAD PLUS UV RESISTANT CLADDING.

C. INSTALL EXTERIOR DUCTWORK WITH SUFFICIENT SLOPE T O ENSURE THAT WATER CANNOT POND ANYWHERE ON THE DUCT. DRAINAGE MUST BE ACHIEVED BY SLOPING DUCTWORK – NOT BY VARYING THE INSULATION THICKNESS. LOCATE LONGITUDINAL SEAMS OF OUTER SHELL (ALUMINUM, FLEXIBLE ELASTOMERIC, OR CLADDING AS APPLICABLE) AT BOTTOM OF DUCT. INSTALL CLADDING IN STRICT CONFORMANCE WITH CLADDING MANUFACTURER’S INSTRUCTIONS.D, PROVIDE FIBERGLASS

DUCT LINER WITH FIBERS FIRMLY BONDED
D. TOGETHER WITH A THERMOSETTING RESIN. LINER SURFA CE SHALL SERVE AS A BARRIER AGAINST INFILTRATION OF DUST AND DIRT, SHALL MEET ASTM C1338 FOR FUNGI

RESISTANCE, AND SHALL BE CLEANABLE USING DUCT CLEANING METHODS AND EQUIPMENT OUTLINED BY NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA) DUCT CLEANING GUIDE. INSTALL WITH LINER ADHESIVE AND MECHANICAL FASTENERS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS.

DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR D IMENSIONS. INCREASE SHEET METAL BY LINER THICKNESS IN BOTH DIRECTIONS WHERE LINER IS INSTALLED.

E. PROVIDE RECTANGULAR LINER CONFORMING TO ASTM C10 71, TYPE I OR II THAT IS 1 INCH THICK, 1-1/2 POUND DENSITY, MINIMUM R-8.0 CERTAINTEED CORP. TOUGHGARD OR EQUIVALENT, JOHNS MANVILLE, OWENS-CORNING, OR KNAUF.

F. PROVIDE ROUND LINER THAT IS1 INCH THICK, 4 POUND DENSITY, MINIMUM R-8.0 JOHNS MANVILLE SPIRACOUSTIC PLUS OR EQUIVALENT, CERTAINTEED OR OWENS-CORNING.

G. COVER OUTDOOR AIR, EXHAUST AIR AND RELIEF AIR PLE NUMS CONNECTED TO EXTERIOR LOUVERS WITH 1-1/2 INCH THICK, 1.5 POUND DENSITY, RIGID FIBERGLASS INSULATION CONFORMING TO ASTM C612, CLASS 2.

H. INSULATING MATERIALS, ADHESIVES, COATINGS, ETC., SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATING OF 50 PER ASTM E84. CONTAINERS FOR MASTICS AND ADHESIVES SHALL HAVE U.L. LABEL.

3.2 PLENUM INSULATION
A. PROVIDE FYREWRAP 0.5 PLENUM INSULATION OR ETS SC HAEFER PLENUMSHIELD BLANKET TO ENCAPSULATE COMBUSTIBLE MATERIALS LOCATED WITHIN A FIRE-RATED RETURN AIR PLENUM WHERE PERMITTED BY AHJ. PLENUM INSULATION SHALL BE 1/2 INCH THICK, 6 TO 8 PCF DENSITY, CONSISTING OF A HIGH TEMPERATURE BIO-SOLUBLE MATERIAL WITH ALUMINUM FOIL ENCAPSULATING MATERIAL AND FIBERGLASS REINFORCING SCRIM COVERING. PLENUM INSULATION SHALL BE RATED AND CERTIFIED PER UL 1887 (MODIFIED), ASTM E136 FOR NON-COMBUSTIBILITY AND ASTM E84/UL 723 FOR SURFACE BURNING CHARACTERISTICS. PROVIDE MINIMUM 1 INCH OVERLAP AT ALL SEAMS AND JOINTS AND SECURE INSULATION WITH STAINLESS STEEL BANDING AT LOCATIONS AND INTERVALS PER MANUFACTURERS INSTRUCTIONS.

C. INSTALL PIPING CONCEALED EXCEPT IN UNFINISHED ARE AS. INSTALL PIPING AS REQUIRED TO MEET CONSTRUCTION CONDITIONS AND ALLOW FOR THE INSTALLATION OF OTHER WORK INCLUDING AIR DUCTS, ELECTRICAL CONDUIT AND LIGHT FIXTURES. INSTALL THE HORIZONTAL PIPING AS HIGH AS POSSIBLE TO ALLOW FOR SPECIFIED SLOPE AND OUTSIDE THE INSULATION. ALLOW SUFFICIENT SPACE ABOVE REMOVABLE CEILING PANELS TO ALLOW FOR PANEL REMOVAL. ARRANGE WATER SYSTEMS SO THAT THE ENTIRE BUILDING CAN BE DRAINED. PROVIDE A 3/4 INCH DRAIN WHICH INSTALLED (SCREWED, SOLDERED, OR FLANGED), WHICH EFFECTIVELY ISOLATE DISSIMILAR METALS, PREVENT GALVANIC ACTION, AND STOP CORROSION. BRANCH CONNECTIONS SHALL BE FROM THE TOP OR SIDE OF THE MAIN PIPING.

D. PROVIDE HANGER RODS OF THE REQUIRED LENGTH AND SI ZE SUSPENDED FROM INSERTS IN THE CONCRETE OR SUITABLE STEEL SUPPORTS FASTENED TO THE BUILDING CONSTRUCTION SO THAT PIPES ARE PARALLEL AND EVENLY SPACED. PIPE ATTACHMENTS SHALL BE COPPER-PLATED OR HAVE NONMETALLIC COATING FOR ELECTROLYTIC PROTECTION WHERE ATTACHMENTS ARE A SUPPORT WITHIN O NE FOOT OF EACH CHANGE OF DIRECTION. PROVIDE TWO NUTS ON THREADED SUPPORTS TO SECURELY FASTEN THE SUPPORT.

E. PRESSURE TEST THE PIPING SYSTEM FOR 15 MINUTES AT 1.5 TIMES THE OPERATING PRESSURE OR 100 PSI, WHICHEVER IS MORE, WITH NO OBSERVABLE LOSS IN PRESSURE. WATER SHALL BE USED FOR PRESSURE TESTING.

F. AFTER SATISFACTORY PRESSURE TEST IS OBTAINED, FLU SH PIPING SYSTEM USING A MINIMUM VELOCITY OF 4 FPS THROUGH ALL PORTIONS OF THE SYSTEM. MAKE ALL PROVISIONS

REQUIRED TO ISOLATE HVAC EQUIPMENT, COILS, CONTROL VALVES, AUTOMATIC FLOW CONTROL VALVES, PRESSURE INDEPENDENT CONTROL VALVES, AND BALANCE VALVES DURING CLEAN, AND REPLACE STRAINERS.

A. FOR HOT PIPING, PROVIDE PIPE HANGERS AND RISER CL AMPS SIZED FOR THE OUTSIDE DIAMETER OF PIPING. BUTT INSULATION TO HANGER OR RISER CLAMP FOR VERTICAL PIPE.

SEAL EXPOSED INSULATION WITH INSULATION SEALER. EXCEPTION FOR VERTICAL PIPING: PROVIDE CLAMPS SIZED F OR THE OUTSIDE DIAMETER OF THE VERTICAL PIPE AND EXTEND CLAMP THROUGH INSULATION. SEAL PENETRATIONS OF INSULATION AND VAPOR BARRIER WITH WET COAT OF VAPOR BARRIER LAP CEMENT. FOR PIPES 2 INCH AND SMALLER USING

FIBERGLASS OR FLEXIBLE ELASTOMERIC INSULATION WITHOUT PRE-INSULATED SUPPORTS, PROVIDE INSULATION PROTECTION SHIELDS INSTALLED BETWEEN HANGER AND PIPE WHI CH MEETS THE FOLLOWING MINIMUM LENGTH REQUIREMENTS:

1. NPS 1-1/4 AND SMALLER: INSULATION SHALL BE ONE OF T HE FOLLOWING:

A. RETAIN ONE OR MORE OF SIX SUBPARAGRAPHS BELOW.

B. CELLULAR GLASS: 1-1/2 INCHES THICK.

C. FLEXIBLE ELASTOMERIC: 1 INCH THICK.

D. MINERAL-FIBER, PREFORMED PIPE INSULATION, TYPE I: 1 INCH THICK.

2. NPS 1-1/2 AND LARGER: INSULATION SHALL BE ONE OF TH E FOLLOWING:

A. RETAIN ONE OR MORE OF SIX SUBPARAGRAPHS BELOW.

B. CELLULAR GLASS: 1-1/2 INCHES THICK.

C. FLEXIBLE ELASTOMERIC: 1 INCH THICK.

D. MINERAL-FIBER, PREFORMED PIPE INSULATION, TYPE I: 1 INCH THICK.

3.7 BUILDING AUTOMATION CONTROL EQUIPMENT
A. BUILDING AUTOMATION SYSTEM (BAS) MANUFACTURERS AN D MODEL NUMBERS ARE LISTED FOR REFERENCE AS TO QUALITY AND FEATURES REQUIRED FOR THE CONTROL DEVICES.

PROVIDE CONTROLLERS BY AUTOMATED LOGIC, DELTA CONTROLS, HONEYWELL, JOHNSON CONTROLS, SCHNEIDER ELECTRIC, SIEMENS, OR TRANE WITH QUALITY AND FEATURES AS INDICATED. CONTROL DEVICES OTHER THAN CONTROLLERS NEED NOT BE MANUFACTURED BY THE MANUFACTURERS LISTED ABOVE.

B. CONTROL PROTOCOL SHALL BE BASED UPON BACNET PROTO COL COMPLYING WITH ASHRAE STANDARD 135. PHYSICAL/DATA LINK COMMUNICATION BUS BETWEEN CONTROLLERS SHALL BE EIA 485 TWISTED CABLE PAIR ACCORDING TO MASTER SLAVE/TOKEN PASSING (MS/TP) PROTOCOL.

C. PROVIDE BACNET TESTING LABORATORY (BTL) CERTIFIED CONTROLLERS CONFORMING TO THE ADVANCED APPLICATION CONTROLLER (B-AAC) DEVICE PROFILE OR APPLICATION SPECIFIC CONTROLLER (B-ASC) DEVICE PROFILE TO FACILITATE THE DESIRED SEQUENCE OF OPERATION.

D. CONTROLLER SHALL HAVE THE FOLLOWING FEATURES: MI CROPROCESSOR WITH SUFFICIENT MEMORY TO SUPPORT THE CONTROLLER’S OPERATING SYSTEM, DATABASE, AND PROGRAMMING REQUIREMENTS; REAL-TIME CLOCK FOR SCHEDULING; SELF-DIAGNOSTICS; CAPABILITY OF STANDALONE OPERATION IF NETWORK COMMUNICATION IS LOST; LOGGING CAPABILITY; SERVICE COMMUNICATION PORT FOR LOCAL CONNECTION TO A PORTABLE OPERATOR’S TERMINAL; LOCAL KEYPAD AND DISPLAY FOR INTERROGATING AND EDITING CONTROLLER DATA; DIAGNOSTIC LEDS FOR POWER, COMMUNICATION AND PROCESSOR; NON-VOLATILE MEMORY WHICH IS CAPABLE OF MAINTAINING ALL BIOS AND PROGRAMMING INFORMATION FOR A MINIMUM OF 72 HOURS; POWER AND NO ISE IMMUNITY; AND SURGE AND TRANSIENT PROTECTION.

E. CONTROLLER SOFTWARE SHALL SUPPORT THE FOLLOWING A PPLICATIONS: SYSTEM SECURITY RESTRICTING MODIFICATION WITHOUT PASSWORD; OBJECT SCHEDULING WITH DAILY, WEEKLY, ANNUAL, HOLIDAY, AND EXCEPTION EVENTS; ALARM REPORTING VIA TEXT MESSAGE OR EMAIL AND LOGGING; MAINTENANCE MANAGEMENT; SEQUENCING; PID CONTROL CHARACTERISTICS; STAGGERED STARTING OF EQUIPMENT; A NTI-SHORT CYCLING; ON-OFF CONTROL WITH DIFFERENTIAL; TRENDING; RUN-TIME, PULSE, AND EVENT TOTALIZATION.

F. PROVIDE CONTROL PANELS LISTED ACCORDING TO UL 508 A AND NEMA RATED ACCORDING TO ITS INSTALLATION LOCATION. PROVIDE COMMON KEYING FOR ALL PANELS.

1.1 HYDRONIC SPECIALTIES
A. PROVIDE SHUTOFF VALVES 2 INCHES AND SMALLER WITH THREADED ENDS AND BRONZE BODY CONSTRUCTION. PROVIDE VALVES LARGER THAN 2 INCHES WITH FLANGED ENDS AND CAST IRON BODY CONSTRUCTION. PROVIDE RISING OR OS&Y STEMS EXTENDED TYPE IF INSULATED, HANDWHEEL OPERATORS, SOLID DISCS, AND REPLACEABLE TEFLON PACKING.

PROVIDE LUG TYPE BUTTERFLY VALVES. VALVES SHALL BE CLASS 125 FOR GATE, CHECK AND GLOBE VALVES, CLASS 150 FOR BALL VALVES, AND 200 PSI CWP FOR BUTTERFLY VALVES.

VALVES SHALL MEET MSS SPECIFICATIONS. INSTALL VALVES WHERE SHOWN AND WHERE NECESSARY FOR CUT-OFF, FOR BALANCING AND FOR CONTROL. VALVES SHALL BE CRANE, HAMMOND, JENKINS, MILWAUKEE, NIBCO, POWELL, OR STOCKHAM. FOR 2 INCHES AND SMALLER, REFERENCE MANUFACTURER WITH MODEL NUMBER FOR BALL VALVES IS NIBCO #T-585-70, GATE VALVES IS NIBCO T-111, CHECK VALVES IS NIBCO T-413-Y, AND GLOBE VALVES IS NIBCO T-211-Y. FOR LARGER THAN 2 INCHES, REFERENCE MANUFACTURER WITH MODEL NUMBER FOR BALL VALVES IS NIBCO #T-595-Y, GATE VALVES IS NIBCO F617-O, FOR CHECK VALVES IS NIBCO F-918-B, FOR GLOBE VALVES IS NIBCO F-718-B, AND FOR BUTTERFLY VALVES IS NIBCO LD-2000.

B. PROVIDE CONTROL VALVES CONFORMING TO THE CONSTRUC TION REQUIREMENTS OF SHUTOFF VALVES DESCRIBED ABOVE. SIZE TWO-POSITION CONTROL VALVES USING PIPE LINE SIZE. SIZE TWO-POSITION BUTTERFLY VALVES USING THE 90 DEGREE FLOW COEFFICIENT (CV). SIZE MODULATING CONTROL VALVES TO PRODUCE THE REQUIRED CAPACITY AT A PRESSURE LOSS NOT EXCEEDING 5 PSI. SIZE MODULATING BUTTERFLY VALVES USING THE 60 DEGREE FLOW COEFFICIENT (CV). CONTROL VALVES SHALL HAVE EQUAL PERCENTAGE FLOW CHARACTERISTICS AND SHALL NOT BE LESS THAN 1/2 INCH IN SIZE. NOMINAL BODY RATING SHALL BE THE LARGER OF 125 PSI OR THE SYSTEM STATIC HEAD PLUS THE MAXIMUM PUMP HEAD AT THE MAXIMUM TEMPERATURE OF THE CONTROL MEDIUM (I.E. CHILLED WATER, HEATING WATER, ETC.). VALVES SHALL MEET MSS SPECIFICATIONS AND CLASS IV LEAKAGE REQUIREMENTS PER ANSI/FCI 70-2. PROVIDE TWO-WAY MODULATING VALVES WITH CLOSE-OFF RATINGS EXCEEDING THE MAXIMUM PRESSURE DIFFERENCE, AT ANY LOAD CONDITION, BETWEEN THE OUTLET AND INLET. EQUIP EACH VALVE WITH PROPER PACKING TO ENSURE THERE WILL BE NO LEAKAGE AT THE VALVE STEM. VALVES SHALL BE MANUFACTURED BY BELIMO, BRAY, DANFOSS, GRISWOLD CONTROLS, HONEYWELL, JOHNSON CONTROLS, KELE, SCHNEIDER ELECTRIC, SIEMENS, AND VICTAULIC.

C. PROVIDE VALVE OPERATORS FOR EACH AUTOMATIC VALVE WITH SUFFICIENT CAPACITY TO OPERATE THE VALVE UNDER ALL CONDITIONS AND TO GUARANTEE TIGHT CLOSE-OFF AGAINST SYSTEM PRESSURE ENCOUNTERED. PROVIDE OPERATORS WITH SPRING-RETURN FOR NORMALLY CLOSED OR NORMALLY OPEN POSITION FOR FAIL SAFE OPERATION TO ACCOUNT FOR FIRE, LOW TEMPERATURES, OR POWER INTERRUPTION AS INDICATED.

D. PROVIDE CIRCUIT BALANCING VALVES MANUFACTURED BY ARMSTRONG, BELL & GOSSETT ITT, GRISWOLD, NIBCO, PRO HYDRONICS, TACO, OR TOUR & ANDERSSON. VALVE SHALL BE RATED FOR 125 PSIG WATER WORKING PRESSURE, 250 DEGREES FAHRENHEIT MAXIMUM OPERATING TEMPERATURE AND SHALL BE BRONZE BODY WITH PLUG OR GLOBE STYLE VALVE AND CALIBRATED ORIFICE OR VENTURI. PROVIDE WITH CONNECTIONS FOR PORTABLE DIFFERENTIAL PRESSURE METER WITH INTEGRAL CHECK VALVES AND SEALS. VALVE SHALL HAVE INTEGRAL POINTER AND CALIBRATED SCALE TO REGISTER DEGREE OF VALVE OPENING. VALVE SHALL HAVE POSITION INDICATION READOUT AND BUILT-IN MEMORY STOP FOR REPEATABLE REGULATION AND CONTROL. VALVES 2 INCH AND SMALLER SHALL HAVE THREADED CONNECTIONS AND 2-1/2 INCH VALVES SHALL HAVE FLANGED CONNECTIONS.

E. PROVIDE Y-TYPE STRAINERS RATED FOR 125 PSIG WORKI NG PRESSURE AND WITH PERFORATED TYPE 304 STAINLESS STEEL BASKET AND BOTTOM DRAIN CONNECTION. SCREEN OPENINGS SHALL BE 20 MESH FOR 2 INCHES AND SMALLER, 1/16 INCH PERFORATIONS FOR 2-1/2 INCHES TO 4 INCHES AND 1/8 INCH PERFORATIONS FOR LARGER THAN 4 INCHES. FOR 2-1/2 INCHES AND LARGER, PROVIDE CAST-IRON BODY (ASTM A 126, CLASS B), FLANGED ENDS, AND BOLTED COVER. FOR 2 INCHES AND SMALLER, PROVIDE CAST BRONZE (ASTM B 62) BODY, THREADED ENDS AND SCREWED COVER.

F. PROVIDE THERMOMETERS (GENERAL) WITH ACCURACY OF P LUS OR MINUS 1 PERCENT OF RANGE SPAN OR PLUS OR MINUS ONE SCALE DIVISION TO MAXIMUM OF 1.5 PERCENT OF RANGE SPAN. TEMPERATURE RANGE FOR CHILLED WATER SERVICE SHALL BE 30 TO 240 DEGREES FAHRENHEIT WITH 2-DEGREE SCALE DIVISIONS (0 TO 115 DEGREES CELSIUS WITH 1- DEGREE SCALE DIVISIONS); HEATING WATER SHALL BE 30 TO 300 DEGREES FAHRENHEIT WITH 2-DEGREE SCALE DIVISIONS (0 TO 150 DEGREES CELSIUS WITH 1-DEGREE SCALE DIVISIONS).

G. PROVIDE BRASS OR STAINLESS STEEL THERMOWELLS, PRE SSURE RATED TO MATCH PIPING SYSTEM DESIGN PRESSURE; WITH 2-INCH EXTENSION FOR INSULATED PIPING AND THREADED CAP NUT WITH CHAIN PERMANENTLY FASTENED TO WELL AND CAP. INSTALL IN PIPING TEE WHERE THERMOMETERS ARE INDICATED, IN VERTICAL POSITION. FILL WELL WITH OIL OR GRAPHITE AND SECURE CAP.

H. PROVIDE GENERAL USE PRESSURE GAUGES, ASME B40.1, GRADE A, PHOSPHOR BRONZE BOURDON-TUBE TYPE, BOTTOM CONNECTION; CASE OF DRAWN STEEL OR BRASS, GLASS LENS, 4-1/2-INCHES DIAMETER; CONNECTOR OF BRASS, 1/4-INCH NPS; SCALE SHALL BE WHITE COATED ALUMINUM, WITH PERMANENTLY ETCHED MARKINGS; ACCURACY OF PLUS OR MINUS 1 PERCENT OF RANGE SPAN, 2 TIMES OPERATING PRESSURE; SYPHON OF 1/4-INCH NPS STRAIGHT COIL CONSTRUCTED OF BRASS TUBING WITH THREADS ON EACH END; SNUBBER OF 1/4-INCH NPS BRASS BUSHING WITH CORROSION-RESISTANT POROUS METAL DISC. DISC MATERIAL SHALL BE SUITABLE FOR FLUID SERVED AND RATED PRESSURE.

PROVIDE TEST PLUGS MANUFACTURED BY FLOW DESIGN INC., MG PIPING PRODUCTS CO., PETERSON EQUIPMENT CO., SISCO, WATTS REGULATOR CO., OR EQUAL. TEST PLUGS SHALL BE NICKEL-PLATED BRASS BODY WITH NEOPRENE CORE MATERIAL, WITH 1/2-INCH NPS FITTING AND 2 SELF-SEALING VALVE-TYPE CORE INSERTS, SUITABLE FOR INSERTING A 1/8-INCH O.D. PROBE ASSEMBLY FROM A DIAL-TYPE THERMOMETER OR PRESSURE GAUGE. TEST PLUG SHALL HAVE GASKETED AND THREADED CAP WITH RETENTION CHAIN AND BODY OF LENGTH TO EXTEND BEYOND INSULATION. PRESSURE RATING SHALL BE 500 PSIG.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:00 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL SPECIFICATIONS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-004
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:00 PM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL SCHEDULES
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-005
NOTES:

1. FILTERS ARE TO BE PROVIDED WITH PRE-FILTER. MAXIMUM PRESSURE DROP SHALL BE BASED ON TOTAL PRESSURE DROP ACROSS THE FILTER BANK WITH DIRTY FILTERS.

2. DISCONNECT PROVIDED BY DIV 26 CONTRACTOR.

3. PROVIDE FANS WITH VFD - BY RTU MANUFACTURER.

4. PROVIDE WITH 100% AIR ECONOMIZER AND POWER EXHAUST.

5. UNIT SHALL COMPLY WITH ECONOMIZER FAULT DETECTION AND DIAGNOSTICS (FDD) REQUIREMENTS PER CALIFORNIA TITLE 24, PART 6.

6. PROVIDE WITH DUCT SMOKE DETECTOR FOR AUTOMATIC UNIT SHUT OFF. FURNISHED AND WIRED BY DIV 26 CONTRACTOR. INSTALLED BY DIV 23 CONTRACTOR.

7. POWERED EXHAUST/ECONOMIZER REQUIRES SEPERATE POWER CONNECTION.

8. REMOVE EXISTING UNIT CURB AND VIBRATION ISOLATORS. INSTALL CDI 3100-3105 ROOF CURB. VIBRATION ISOLATION SPRINGS SHALL BE CALDYN 2" ISOLATORS.

9. PROVIDE CORROSION RESISTANT COATING ON COILS.

RTU-1 1ST FLOOR 2,000 190 1,500 5.0 12.9 R-410A 11 MERV 13 54 .9 52.8 75.9 61.2 53.0 52.0 47.9 37.0 70.0 1 0.80 0.41 1 1.0 1.5 1 ,433 460 3 12.0 15 TRANE WHC060H4R0A 2000 0.75 1.5 1.875 3.375 460/3 6142-PE/MPE 1-9

MERV RATING
TOTAL

CAPACITY
(MBH)

SENSIBLE

CAPACITY
(MBH)
EDB
(F)
EWB
(F)
LDB
(F)
LWB
(F)

CAPACITY
(MBH)

AMBIENT

TEMP (F)

HEATING
EAT (F) NO. OF COMP. FLA (A) POWER
(KW)
NO. OF
FANS
ESP
(IN-WG) HP SPEED
(RPM) CFM HP FLA MCA MOCP VOLT/PH MODEL MARK AREA SERVED

NOMINAL

CAPACITY
(TONS)

EER REFRIG
TYPE
REFRIG
CHARGE
(LBS)

FILTER COOLING HEATING COMPRESSORS FANS SUPPLY

VOLTS PHASE MCA MOP

UNIT IDENTIFICATION
MAX
SUPPLY
AIR
(CFM)

MIN OSA
(CFM)
UNIT

OPERATING
WEIGHT
(LBS)

CAPACITY AND PERFORMANCE COMPONENTS PERFORMANCE CONDENSER SECTION FANS ELECTRICAL

MANUFACTURER
(BASIS OF DESIGN)
MODEL
NUMBER

POWER EXHAUST/ECONOMIZER
NOTES

ROOF TOP UNIT SCHEDULE
NOTES:

1. BOXES TO BE PROVIDED WITH INTEGRAL ACCESS PANEL.

2. MINIMUM CFM TO BE GREATER OF 20% OF BOX MAXIMUM OR ZONE MINIMUM VENTILATION.

3. MINIMUM HEATING CFM TO BE 50% OF BOX MAXIMUM OR ZONE MINIMUM VENTILATION

4. PROVIDE WITH CONTROL TRANSFORMER, CROSS FLOW VELOCITY SENSOR AND CONTROL ENCLOSURE.

5. VAV BOX INSULATION SHALL BE 1" THICK, 1.5 LB/FT2, MEETING ASTM C1136 FOR MOLD, MILDEW AND HUMIDITY RESISTANCE, NFPA-901 & UL181.

6. BOX ORIENTATION TO BE FIELD VERIFIED PRIOR TO ORDER.

7. PROVIDE WITH INTEGRAL 5FT ATTENUATOR.

VAV-4 INTERVIEW 4 1 0.25 100 45 50 45 2.0 55.0 90.0 0.25 WATER 0. 09 180.0 137.6 0.01 PRICE SDV5 1,2,3,4,5,6,7 VAV-3 VESTIBULE/ PARA TRANSIT 4 1 0.25 150 45 75 45 2.9 55.0 9 0.0 0.25 WATER 0.15 180.0 141.3 0.02 PRICE SDV5 1,2,3,4,5,6, 7 VAV-2 STANDBY 9 1 0.25 1,000 200 500 200 19.0 55.0 90.0 0.25 WAT ER 1.76 180.0 157.9 2.73 PRICE SDV5 1,2,3,4,5,6,7 VAV-1 DISPATCH 8 1 0.25 700 140 350 140 13.5 55.0 90.0 0.25 WATE R 1.37 180.0 160.0 1.29 PRICE SDV5 1,2,3,4,5,6,7

MARK AREA SERVED BOX INLET
(IN)
COIL
ROWS

TOTAL BOX
APD
(IN-WG)
MAX

COOLING
(CFM)
MIN

COOLING
(CFM)
MAX

HEATING
(CFM)
MIN

HEATING
(CFM)

CAPACITY
(MBH)
EDB
(F)
LDB
(F)

MAX APD
(IN-WG)
FLUID
TYPE
FLOW
(GPM)
EWT
(F)
LWT
(F)

MAX WPD
(FT.WG)

UNIT IDENTIFICATION BOX CHARACTERISTICS AIRFLOW HEATING COIL

MANUFACTURER MODEL

NUMBER NOTES

VARIABLE AIR VOLUME BOX SCHEDULE
NOTES:

1. REFER TO FLOOR PLANS FOR EXACT LOCATION. PROVIDE ALL FRAMES AND ACCESSORIES AS REQUIRED FOR PROPER INSTALLATION.

2. FLEXIBLE DUCTWORK SHALL BE THE SAME SIZE AS THE DIFFUSER NECK OR AN EQUIVALENT ROUND DUCT. FLEXIBLE DUCTWORK SHALL BE SUPPORTED TO PREVENT KINKS OR BENDS.

3. COLOR TO BE SELECTED BY ARCHITECT FROM STANDARD COLORS.

R-1 24x24 -- RETURN SURFACE ALUMINUM PRICE PDR 1,2,3
CD-2 24x24 10 4-WAY SURFACE STEEL PRICE SPD 1,2,3
CD-1 24x24 8 4-WAY SURFACE STEEL PRICE SPD 1,2,3
MARK

DIFFUSER

FACE SIZE
(IN)

DIFFUSER

NECK SIZE
(IN)
FLOW

PATTERN

MOUNTING

TYPE MATERIAL MANUFACTURER MODEL NUMBER NOTES

GRILLE, REGISTER, DIFFUSER SCHEDULE
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:00 PM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>
MECHANICAL TITLE 24
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-006
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D
12"ø SA
8"ø SA

ALL VAV BOXES, DUCTWORK,

AND DIFFUSERS

WITHIN THE HATCH TO BE
DEMOLISHED.
(E)12" SUPPLY DUCT TO REMAIN.

CONNECTS TO (E)VAV 1 -10.

UP TO (E)TX -A1
(E)CD
200
POD
30"x16"
(E)VAV
1-4 12"ø 8"ø
12"ø
20"x20"
26"x16" 20"x20"
(E)DUCT CONT.
(E)DUCT CONT.
2 A
C
B
1 D
(E)RTU UNIT HP -A1 TO BE DEMOLISHED.

REMOVE ASSOCIATED DUCTING.

REUSE (E)CONDENSATE DRAIN LINE WITHIN
THE BUILDING. DEMO (E)ROOF CONDENSATE DRAIN

AND POC TO (N)ROOF CONDENATE DRAIN LINE
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:03 PM
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL FLOOR PLANS -

DEMOLITION
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
MD-201
1/8" = 1'-0" MD-201
1 MECHANICAL GROUND FLOOR PLAN - DEMOLITION
1/8" = 1'-0" MD-201
2 MECHANICAL ROOF PLAN - DEMOLITION
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D
ZONE 1
VAV -1
ZONE 2
VAV -2
ZONE 3
VAV -3
ZONE 4
VAV -4
ZONE 5
(E)VAV 1 -10
ZONE 6
(E)VAV 1 -4
T
T
T
T
T
co
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:00 PM
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL ZONING PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-200
1/8" = 1'-0" M-200
1 MECHANICAL GROUND FLOOR PLAN - NEW CONSTRUCTION ZONE
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D
10"ø SA 10"ø SA
12"ø SA
8"ø SA
8"ø SA
VAV
3 17"x32" RA 17"x32" RA UP
19"x32" SA 19"x32" SA UP
VAV
4 VAV
1 8"ø SA
VAV
2 14"ø SA 10"ø SA
12"ø SA
40"x18"
32"x20" (E)CD
200

BELLMOUTH

W/ BIRDSCREEN
(E)12" DUCT CONNECTS TO
(E)VAV 1 -16.
8"ø
30"x16" TB
12"X12" TB
12"X12" TB
12"X12" TB
(E)VAV
1-4
12"ø
20"x20"
30"x16"
20"x20" 26"x16" (E) (E) (E)
(E)
(E)
(E)
POC
(E)DUCT CONT.
(E)DUCT CONT.
(E)DUCT CONT.
8"ø
CD-1
230
3 12"ø
RA-1
1000
ALL
10"ø
CD-2
330
3 8"ø
CD-1
100
8"ø
CD-1
100
8"ø
CD-1
100
10"ø
CD-2
300
2 (E)DUCT CONT.
12"ø SA
5' SOUND

ATTENUATOR
(TYP ALL)
2 A
C
B
1 D
RTU
1 18"x32" RA
20"x32" SA
32"X18" RA DUCT

UP FROM FIRST FLOOR
32"X20" SA DUCT

DOWN TO FIRST FLOOR
3/4" CD
CONNECT NEW 3/4" CONDENSATE

DRAIN TO EXISTING CONDENSATE
DRAIN LINE.

EQUIPMENT PAD/WALKWAY
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
2/2/2022 2:21:58 PM
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL FLOOR PLANS - NEW

CONSTRUCTION
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-201
1/8" = 1'-0" M-201
1 MECHANICAL GROUND FLOOR PLAN - NEW CONSTRUCTION
1/8" = 1'-0" M-201
2 MECHANICAL ROOF PLAN - NEW CONSTRUCTION

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 A
C
B
1 D
1 1/4" HWS
1 1/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
VAV
1 VAV
2 (E)MAIN HOT WATER
PIPING
(N)HOT WATER PIPING POC
(E)VAV
1-4
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
VAV
4 VAV
3 3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
1" HWS
1" HWR

OUTSIDE OF AREA OF WORK
(PER ARCHITECTURAL).

COORDINATE CEILING ACCESS

AND PATCHING IF NECESSARY

ISOLATION VALVES
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:02 PM
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL HOT WATER PIPING
PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-202
1/8" = 1'-0" M-202
1 MECHANICAL GROUND FLOOR PLAN - NEW CONSTRUCTION HOT WATER PIPING PLAN Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
1 2
5 4 3
2 1
D

SHEET METAL
DUCT

SUPPORT FLEXIBLE DUCT

FROM ABOVE
(SIZE PER SMACNA)

LOAD RATED FASTENERS

METAL CLAMP
1” WIDE GALVANIZED

SHEET METAL

DUCT STRAP
R=1.5D

INSULATED FLEXIBLE DUCT

METAL CLAMP

AT DIFFUSER NECK

EARTHQUAKE TAB
12 GAUGE SECURITY
WIRE (TYP.3)

CEILING

CEILING DIFFUSER

SUPPLY AIR
4 6

CEILING CEILING DIFFUSER SUPPLY AIR
4 6
1” WIDE GALVANIZED

SHEET METAL

DUCT STRAP

METAL CLAMP

AT PLENUM BOX

METAL CLAMP

EARTHQUAKE TAB
2 GAUGE

SECURITY
SAFETY
WIRE (TYP.3)

LINED PLENUM
WITH HEIGHT=
FLEX. DUCT DIA.+2 WIDTH=
DIFFUSER NECK +2
1” INTERNAL LINING

INSULATED

FLEXIBLE
DUCT

SUPPORT FLEXIBLE

DUCT FROM ABOVE
(SIZE PER SMACNA)

1. FLEXIBLE DUCT MAXIMUM LENGTH SHALL BE
5 FEET.

2. ACOUSTICAL TILE CEILING SHOWN (GYPBOARD
CEILING SIMILAR).

3. USE SIDE CONNECTION IN TIGHT SPACES ONLY.

4. WHERE FLEXIBLE DUCTS ARE SHOWN ON

DRAWINGS, PROVIDE SIMILAR PLENUM FOR
DUCTED RETURN/ EXHAUST AIR GRILLES.

5. MAXIMUM ALLOWABLE SAG SHALL NOT EXCEED
1/2"PER LINER FT.

6. FLEXIBLE DUCTS SHALL NOT BE USED FOR
ENVIRONMENTAL EXHAUST.

7. ALL BRACING AND ATTACHMENT TO STRUCTURE
SHALL COMPLY WITH ASCE 7 GUIDELINES AND

CBL AMENDMENTS IN ACCORDANCE WITH ISAT

PUBLICATIONS WITH AN OSHPD PRE-APPROVAL
NO. OPA-0485.

DUCT BRANCH

MAIN DUCT

MANUAL VOLUME

DAMPER (VD)
SUPPLY

AIR FLOW

RETURN/ EXHAUST

AIR FLOW
1/3 WIDTH OF BRANCH, 5" MIN.

1. FURNISH THIS TYPE OF CONNECTION WHEN SINGLE-LINE DUCTWORK IS INDICATED AS THIS FOR BRANCHES WITH LESS THAN 25% OF THE TOTAL AIR FLOW OR WHERE INDICATED ON DRAWINGS.

2. FOR MANUAL VOLUME DAMPER SEE DETAIL 4/M-601.

3. SLIP-IN VOLUME DAMPER HOUSING WILL NOT BE ALLOWED .

NOTES:

SUPPLY

AIR FLOW

RETURN/ EXHAUST

AIR FLOW

AIR FLOW
MINIMUM R=W

AIR FLOW

RECTANGULAR ELBOW

RADIUS ELBOW
W

SINGLE THICKNESS

TURNING VANES
SQUARE ELBOW SHOW.

PROVIDE ROUND ELBOW.

HOLLOW DOUBLE

THICKNESS

TURNING VANES
(SEE NOTE 1)
NOTES:

1. FOR DICT WIDTH LESS THAN 18" USE MINIMUM 26 GA VA NES AT 2-1/8" O.C., FOR DUCT 18" AND WIDER, USE MINIMUM 24 GA AT 3 -1/4" O.C.

2. FITTINGS TO BE 2 GAGES HEAVIER THAN CONNECTED DUC T. 1"X1/8" GALVANIZED STRAP
1/2" ROUND ROD PIN

RECTANGULAR DUCT

OUTSIDE END BEARING

DAMPER BLADE
1/2" (MAX.) CLEARANCE

ALL AROUND

INSIDE END BEARING

SECTION

SIDE ELEVATION

INSULATION

INSULATION STAND-OFF

HANDLE WITH

DOCKING QUADRANT

INSULATION

DAMPER BLADE
STIFFEN BLADE AS R5EQUIRED

HANDLE WITH LOCKING QUADRANT

AND POSITION INDICATOR
DUCT

2. DETAIL SHOWS SINGLE BLADE DAMPER. MULTI BLADE DAM PERS INSTALLATIONS SHALL BE SIMILAR.

4. PROVIDE "HAT" SECTION AT QUADRANT FOR ALL EXTERN ALLY INSULATED DUCTWORK.

5. PROVIDE FLUORESCENT COLORED MARKERS ON CEILING AT ALL VOLUME DAMPERS LOCATIONS.

NOTES:

DIRECTION OF AIRFLOW DIRECTION OF AIRFLOW

MAIN DUCT

MAIN DUCT
24X36 MIN.

MAINTENANCE
ACCESS

INLET DIAMETER
MIN. 3 X BOX

INLET DIAMETER
MIN. 3 X BOX

CONTROL PANEL

CONTROL PANEL
45 DEGREE BRANCH
(CIRCULAR DUCT)
45 DEGREE BRANCH
(RECTANGULAR DUCT)

DUCT DIAMETER TO

REDUCE ONLY AT

BOX INLET

ACCESS PANEL

ACCESS PANEL

DUCT DIAMETER TO

REDUCE ONLY AT

BOX INLET

PORTS SHALL NOT

INTERFERE WITH

ACCESS TO CONTROLS

REHEAT COIL CONNECTIONS

REHEAT COIL
3'-0" LONG INTERNALLY
LINED DUCT.

REFER TO SPECIFICATIONS
FOR LINE TYPE.

ACCESS DOOR

PORTS SHALL NOT

INTERFERE WITH

ACCESS TO CONTROLS

REHEAT COIL CONNECTIONS

REHEAT COIL
3'-0" LONG INTERNALLY
LINED DUCT.

REFER TO SPECIFICATIONS
FOR LINE TYPE.

ACCESS DOOR
24X36 MIN.

MAINTENANCE
ACCESS

1. REHEAT COIL PIPING HOOK-UP SHALL BE PROVIDED WITH OUT OBSTRUCTING CONTROL PANEL MAINTENANCE ACCESS.

NOTES:

CL

FIBERGLASS BUILDING
INSULATION 0.75 PCF

DENSITY

ACOUSTICAL

SEALANT
25 GA. (MIN.) METAL SLEEVE
(ROOF JACK)
DUCT

FLASHING
(SEE ARCHITECTURAL

SPECIFICATIONS)
ROOF CONSTRUCTION 25mm (TYP.)
NOTES:

1. PROVIDE PITCH POCKET CONSTRUCTION, ADDITIONAL FLASHING OR WEATHER CAP AS REQUIRED FOR WATERPROOF CONSTRUCTION. DO NOT RIGIDLY TIE DUCT OR PIPE TO ST RUCTURE IN ANY WAY.

2. SPACE BETWEEN DUCT OR PIPE AND METAL SLEEVE SHALL BE FREE OF ANY FOREIGN MATERIALS.

3. DUCT OR PIPE SHALL NOT DIRECTLY CONTACT STRUCTURE. WEDGES SHALL NOT BE USED TO MAINTAIN PIPE IN POSITION.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
2/2/2022 2:18:51 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL DETAILS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-601
NOT TO SCALE M-601
1 CEILING SUPPLY AIR DIFFUSER

CONNECTION
NOT TO SCALE M-601
2 RECTANGULAR DUCT BRANCH TO MAIN

DUCT CONNECTION
NOT TO SCALE M-601
3 RECTANGULAR DUCT FITTINGS AND

TAKE-OFF
NOT TO SCALE M-601
4 RECTANGULAR MANUAL VOLUME
DAMPER
NOT TO SCALE M-601
5 VAV TERMINAL CONNECTION
12" = 1'-0" M-601
6 DUCT PENETRATION THROUGH ROOF

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
45°

MANUAL VOLUME
DAMPER

MAIN DUCT
SUPPLY

AIR FLOW

RETURN/ EXHAUST

AIR FLOW
D
R=1.5D
90 DEGREE 5 PIECE ELBOW 45 DEGREE 3 PIECE ELBOW
R=1.5D

CONICAL TEE
(SEE NOTE 4)

REDUCING CONICAL TEE
(SEE NOTE 5)
R R
45°
D

1. FITTINGS TO BE 2 GAGES HEAVIER THAN CONNECTED DUC T.

2. ADJUSTABLE ELBOWS WILL BE PERMITTED FOR DUCT CONS TRUCTION OF 2" W.G. OR LESS.

3. PROVIDE CONTINUOUS SEALANT AT EACH FITTING JOINT.

NOTES:
1/4" (MAX.) LESS THAN DACT DIAMETER

SECTION A -A
A A
PLAN

INDICATING HANDLING LOCKNUT

REGULATOR
3/8" CONTINUOUS SQUARE ROD
GASKET (TYP.)

CLOSED END BEARING
1'X1/8" GALVANIZED STRAP
16 GA GALVANIZED

DAMPER BLADE
1"X1/8" GALVANIZED STRAP 1/4" DIA. SET SCREW

SPOT WELD
3/8" SQUARE ROD
DRAIN

LINE SIZE
(IN.)
3/4

NOMINAL
TONES
1 1-1/4
1-1/2
2 3
4 UP TO 2
UP TO 5
UP TO 30
UP TO 50
UP TO 175
UP TO 3OO
UP TO 400

1. WHERE VERTICAL SPACE DOES NOT PERMIT

TRAP INSTALLATION AS REQUIRED ABOVE FLOOR
SLAB, EXTEND P-TRAP TO BELOW SLAB.

2. FOR INDOOR AND OUTDOOR INSTALLATION

PROVIDE INSULATED DRAIN LINE TO THE POINT
OF DISCHARGE AT APPROVED RECEPTOR.

NOTES:

BLOW THROUGH COIL

1. X = 1"

2. Y = TSP + 1"

DRAW THROUGH COIL

1. X = TSP + 1"

2. Y = 1/2 (TSP + 1")
TSP = TOTAL STATIC PRESSURE

INSIDE DRAIN PLENUM
(INCHES OF WATER COLUMN)

CLEAN OUT

SCREWED METAL
CAP (TYP.)

FLOOR OR ROOF

APPROVED RECEPTOR
X

AIR CONDITIONING UNIT DRAIN LINE SHALL BE AT LEAST

THE SAME SIZE AS THE DRAIN

PAN CONNECTION

OPEN END
SLOPE 1/8"

PER FOOT
(MIN.)

DRAIN PAN

FOR DISSIMILAR METALS

CONNECTION PROVIDE

DIELECTRIC UNION CONNECTION
UNVANED ELBOW (TYP. 2)

LIGHT FIXTURE

SIZING CHART
CFM SIZE (IN.)
UP TO 400 12X12
401 TO 600 18X12
601 TO 800 24X12
801 TO 1000 30X12
1001 TO 1500 30X16
1501 TO 2000 34X20
OVER 2000 USE MULTIPLE TRANSFER
DUCTS
RAGID BOARD ACOUSTICAL DUCT LINING - 1" OR
SIZE AS NOTED ON DRAWINGS.

SHEET METAL SCREW @ 8" O.C. (TYP.)

FULL HEIGHT ACOUSTICAL PARTITION

BEAM (WHERE APPLICABLE)

CEILING

STRUCTURE ABOVE
1/4" 14 GAUGE WIRE

MESH SCREEN
3 1
2 3'-0" MIN.
8" MIN.

1. SEAL DUCT THROUGH ACOUSTICAL PARTITION PENETRATIO N
ON ALL SIDES AIRTIGHT.

2. PROVIDE 8" MIN. HIGH DUCT BOOT WHERE SPACE PERMIT S.

3. SHEET METAL SLEEVE.
1 1/2" POCKET SLIP

FLEXIBLE DUCT CONNECTOR
DUCT

GALVANIZED SHEET METAL
1 1/2" (MIN.) TO 3" (MAX.)
6" NOMINAL WITH MATERIAL
TAUT
NOTES:

1. INTAKE AREA EQUAL A MINIMUM OF TWO RETURN AIR DUCT AREAS.

2. BELL MOUTH TRANSITION SHALL BE PROVIDED ON ALL FO UR SIDES IF SPACE ALLOWS AND ON TWO SIDES IN TIGHT SPACES.

3. PROVIDE 18 INCHES CLEAR AREA IN FRONT OF BELLMOUT H OPENING. 30° MAX
VIEW "A"
16" O.C.
(TYP.)
12" O.C.

RETURN AIR DUCT
(SEE VIEW "A")

AIR INLET
16 GA X 1" WIDE
SHEET

METAL STRAP
DUCT TRANSITION TYP. 2
SIDES
OR 4 SIDES IF SPACE ALLOWS

SHEET METAL SCREW

RETURN DUCT
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:02 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL DETAILS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-602
NOT TO SCALE M-602
7 ROUND DUCT BRANCH TO ROUND MAIN

DUCT CONNECTION
NOT TO SCALE M-602
6 ROUND DUCT FITTINGS
NOT TO SCALE M-602
4 ROUND VOLUME DAMPER UP TO 14 IN.

DIAMETER
NOT TO SCALE M-602
2 TYPICAL CONDENSATE DRAIN TRAP
NOT TO SCALE M-602
5 TYPICAL RECTANGULAR TRANSFER BOOT DETAIL
12" = 1'-0" M-602
3 Fleixble Duct Connector
12" = 1'-0" M-602
1 RETURN AIR DUCT BELLMOUTH DETAIL
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

CONTROL INTERFACE CONNECTION

BETWEEN EQUIPMENT AND EMCS

CONTROLLER INTERFACE CARD PROVIDED
BY EQUIPMENT MANUFACTURER. WIRING TO
INTERFACE CARD BY BAS MANUFACTURER.

SUPPLY AIR STATIC PRESSURE SENSOR FURNISHED BY

EQUIPMENT MANUFACTURER, INSTALLED AND WIRED TO
EQUIPMENT BY BAS MANUFACTURER. SENSOR TO BE
LOCATED IN DUCT MAIN APPROXIMATELY 2/3 WAY
DOWN.

ROOF

SUPPLY AIR MAIN
RTU

AHU BAS POINTS LIST

TAG NAME/FUNCTION AI AO DI DO REMARKS
1 DISCHARGE AIR TEMPERATURE
2 RTU UNIT CONTROLLER COMMUNICATION
LAN CONNECTION. RTU FACTORY PROVIDED

UNIT CONTROLLER SHALL BE CAPABLE OF

SENDING THE FOLLOWING INFORMATION TO

BAS OPERATOR STATION VIA A SINGLE LON
CONNECTION: SUPPLY FAN SPEEDS,

POWER EXHAUSTER SPEED, ECONOMIZER
DAMPER POSITION, CO2 LEVEL, DIRTY FILTER

ALARM AND COMPRESSOR ON/OFF STATUS FOR
EACH COMPRESSOR.
3 SUPPLY AIR STATIC PRESSURE
X
X

BAS SETPOINTS

DESIGNATION MINIMUM RANGE INITIAL SETPOINT
SUPPLY AIR RESET INCREMENT 0-5° F 1.0° F
SUPPLY AIR RESET TIME DELAY 1-10 MINUTES 5 MINUTES
DUCT STATIC PRESSURE 0-0.5" WC 0.2"
SUPPLY AIR TEMPERATURE 0-80°F 55°F
WARM -UP/PRE -COOL RUN -TIME 0-180 MINUTES 60 MINUTES
TEMPERATURE RESET HIGH LIMIT 0-100% 95%
TEMPERATURE RESET LOW LIMIT 0-100% 70%
TEMPERATURE RESET TIME DELAY 0-120 MINUTES 5 MINUTES
RA CO2 SENSOR BY

RTU MANUFACTURER
CO2 LEVEL SETPOINT 0-2000 PPM 1000 PPM
T
P
CO2
2 1
3 SEQUENCE OF OPERATION:

APPLICABLE TO RTU -1
THE FOLLOWING SEQUENCE SHALL BE PERFORMED BY THE BAS SYSTEM:

OCCUPIED/UNOCCUPIED DESIGNATION:

THE BAS SHALL INITIATE OCCUPIED AND UNOCCUPIED MODES PER SCHEDULES FURNISHED BY THE OWNER. OCCUPIED/UNOCCUPIED MODE SCHEDULI NG SHALL BE ADJUSTABLE FOR EACH DAY OF THE WEEK AT THE OPERATOR'S TERMINAL, AND SHALL NOT REQUIRE PROGRAMMING CODE MODIFICATIONS. THE BAS SHALL BE PROGRAM MED TO AUTOMATICALLY START EQUIPMENT AFTER A POWER OUTAGE ONCE POWER IS RESTORED, FOLLOWING THE STANDARD SEQUENCE FOR START -UP AT THE BEGINNING OF THE OCCUPIED MODE.

THE BAS SHALL COMMUNICATE OCCUPIED/UNOCCUPIED STATUS TO THE EQUIPMENT FACTORY CONTROLS.

MORNING WARM -UP/PRE -COOL DESIGNATION:

THE BAS SHALL INITIATE MORNING WARM -UP/PRE -COOL MODES. MODE SHALL BE INITIATED PRIOR TO THE SCHEDULED OCCUPIED MODE START TIME SETPOINT IN ACCORDANCE WITH THE WARM -UP/PRE -COOL RUN -TIME SETPOINT. IF ALL SPACES REACH OCCUPIED SETPOINT PRIOR TO THE SCHEDULED OCCUPIED CHANGEOVER TIME BY MORE THAN THE OCCUPI ED ENGAGEMENT ALLOWANCE SETPOINT, THE WARM -UP/PRE -COOL RUN -TIME SETPOINT SHALL BE ADJUSTED 5 MINUTES LATER. IF ALL SPACES DO NOT REACH OCCUPIED SETPOINT BY THE OCCUPIED MODE START TIME, THE WARM -UP/PRE -COOL RUN -TIME SETPOINT SHALL BE ADJUSTED BY 5 MINUTES EARLIER.

THE BAS SHALL COMMUNICATE WARM -UP/PRE -COOL STATUS TO THE EQUIPMENT FACTORY CONTROLS.

OCCUPIED MODE - DISCHARGE AIR TEMPERATURE RESET:

IF 2 OR MORE VARIABLE VOLUME VAV BOXES ARE AT OR BEYOND THE TEMPERATURE RESET HIGH LIMIT SETPOINT (BASED ON PERCENTAGE OF AIR FLOW, NOT DAMPER POSITION) FOR A

PERIOD GREATER THAN THE TEMPERATURE RESET TIME DELAY (OR CONSTANT VOLUME BOXES WITH VALVE POSITIONS OPEN AT OR BEYOND THE TEM PERATURE RESET HIGH LIMIT), THE DISCHARGE AIR TEMPERATURE SETPOINT SHALL BE LOWERED BY THE SUPPLY AIR RESET INCREMENT SET POINT. IF ALL VARIABLE VOLUME VAV BOXES ARE AT OR BELOW THE

TEMPERATURE RESET LOW LIMIT (BASED ON AIRFLOW) FOR A PERIOD GREATER THAN THE TEMPERATURE RESET TIME DELAY (OR CONSTANT VOLUME BOXES WITH VALVE POSITIONS CLOSED LESS THAN THE RESET LOW LIMIT), DISCHARGE AIR TEMPERATURE SETPOINT SHALL BE INCREASED BY THE SUPPLY AIR RESET INCREMEN T SET POINT.

ONCE TEMPERATURE IS RESET, IT SHALL NOT RESET AGAIN UNTIL THE TEMPERATURE RESET TIME DELAY HAS BEEN ACHIEVED.

THE BAS SHALL COMMUNICATE THE DISCHARGE AIR TEMPERATURE SETPOINT TO THE EQUIPMENT FACTORY CONTROLS.

UNOCCUPIED MODE:

DURING UNOCCUPIED MODE, EQUIPMENT SHALL BE ENABLED WHEN REQUIRED TO MAINTAIN SETBACK TEMPERATURE SETPOINT AT ANY SPACE.

DISCHARGE AIR TEMPERATURE SETPOINT SHALL BE SET TO THE MINIMUM ALLOWABLE SETPOINT WHEN COOLING IS REQUIRED, AND THE MAXIMUM A LLOWABLE SETPOINT WHEN HEATING IS REQUIRED.

THE FOLLOWING SEQUENCE SHALL BE PERFORMED BY THE EQUIPMENT FACTORY CONTROLS:

WARM -UP/PRE -COOL MODE:

EQUIPMENT FACTORY CONTROLS SHALL PERFORM WARM -UP/PRE -COOL SEQUENCE WHEN INITIATED BY THE BAS.

OCCUPIED MODE - SUPPLY FAN SPEED CONTROL:

EQUIPMENT FACTORY CONTROLS SHALL MODULATE SUPPLY FANS AS REQUIRED TO MAINTAIN THE SUPPLY AIR STATIC PRESSURE SETPOINT AT SUPP LY AIR STATIC PRESSURE SENSOR.

OCCUPIED MODE - RELIEF FAN SPEED CONTROL:

WHEN ECONOMIZER COOLING IS ENABLED, EQUIPMENT FACTORY CONTROLS SHALL MODULATE RELIEF FANS IN CONJUNCTION WITH OSA DAMPER POSI TION.

OCCUPIED MODE - DISCHARGE TEMPERATURE CONTROL:

EQUIPMENT FACTORY CONTROLS SHALL CONTROL ECONOMIZER FUNCTION, MECHANICAL COOLING TO MAINTAIN DISCHARGE TEMPERATURE SETPOINT A S ESTABLISHED BY THE BAS.

ECONOMIZER/OUTSIDE AIR CONTROL:

EQUIPMENT FACTORY CONTROLS SHALL MODULATE OUTSIDE/RETURN AIR DAMPERS BETWEEN THE SCHEDULED MINIMUM OSA POSITION AND THE MIN O SA DCV RESET POSITION TO MAINTAIN MAXIMUM CO2 LEVEL IN THE RETURN AIR, AND SHALL INCREASE OUTSIDE AIR FOR ECONOMIZER COOLING VIA DRY BULB CONTROL. CO NTROL SHALL BE FULLY MODULATING.

UPON DETECTION OF A CO2 SENSOR FAILURE, OUTSIDE AIR DAMPER POSITION SHALL BE SET TO THE MIN OSA DCV INCREASE POSITION, OR HIG HER AS INDICATED BY ECONOMIZER CONTROLS.

AUTOMATIC DEMAND SHED CONTROLS:

BAS SHALL ALLOW FOR AUTOMATIC DEMAND SHED CONTROL. BAS SHALL ALLOW FOR REMOTE SET UP/DOWN OF COOLING AND HEATING TEMPERATURE SETPOINTS BY >4 DEGREES FOR ALL NONCRITICAL ZONES CONNECTED TO AN AHU. BAS SHALL ALSO ALLOW FOR REMOTE RESET TO NORMAL TEMEPRATURE SETPOINTS, AND SHALL B E PROGRAMMED TO PROVIDE AN ADJUSTABLE RATE OF CHANGE FOR THE TEMPERATURE SET UP/DOWN AND RESET. BAS SHALL BE PROGRAMMED TO ALLOW FOR THIS DEMAND SHED SE QUENCE TO BE 1) DISABLED, 2) MANUALLY CONTROLLED, OR 3) AUTOMATICALLY CONTROLLED UPON RECEIPT OF A DEMAND RESPONSE SIGNAL FROM EQUIPMENT.

UNOCCUPIED MODE:

WHEN ENABLED BY THE BAS, EQUIPMENT FACTORY CONTROLS SHALL START EQUIPMENT IN FULL RECIRCULATION MODE (UNLESS ECONOMIZER COOLI NG IS REQUIRED), AND MAINTAIN SUPPLY AIR SETPOINT AS ESTABLISHED BY THE EMCS.
4 RTU ON/OFF X
5 PROGRAMMABLE OCCUPANCY SCHEDULE X
4 5
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:04:26 PM

NOT TO SCALE
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL CONTROL DIAGRAM
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-701
NOT TO SCALE M-701
1 RTU CONTROL DIAGRAM
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
SPACE TEMP. SENSOR

SEQUENCE OF OPERATION
SEQUENCE SHALL BE USED FOR ALL AIR TERMINAL UNITS.

WARM -UP/PRE -COOL MODE:

DURING PRE -COOL MODE, TERMINAL UNIT SHALL OPERATE AT 100% COOLING MODE AS OUTLINED IN THE OCCUPIED SEQUENCE OF OPERATION UNTIL THE OCCUPIED SETPOINT IS ACHEIVED. DURING WARM -UP MODE, TERMINAL UNIT SHALL OPERATE AT 100% HEATING MODE UNTIL THE OCCUPIED SETPOINT IS ACHEIVED, EXCEPT PRIMARY AIR DAMPER SHALL REMAIN CLOSED. ONCE OCCUPIED SETPOINT IS ACHIEVED, TERMINAL UNIT SHALL ENTER OCCUPIED MODE.

OCCUPIED MODE:

SUPPLY AIR DAMPER AND HEATING VALVE CONTROL:

STARTING FROM A 100% CALL FOR COOLING: HEATING WATER VALVE SHALL BE FULLY CLOSED AND SUPPLY AIR DAMPER AT DESIGN MAXIMUM COOLING POSITION. SUPPLY AIR DAMPER SHALL MODULATE TO LOWER AIRFLOW AS CALL FOR COOLING DECREASES, AND SHALL REMAIN AT MINIMUM POSITION UNTIL CALLED FOR HEATING OR COOLING. ONCE DAMPER HAS

REACHED THE MINIMUM POSITION AND THERE IS A CALL FOR HEAT, HEATING WATER VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN SPACE TEPERATURE SETPOINT. A DECREASED CALL FOR HEATING AND SUBSEQUENT CALL FOR COOLING SHALL CAUSE THE REVERSE TO OCCUR.

DEMAND CONTROL VENTILATION:

IF ZONE AIR CO2 LEVELS REACH THE MAXIMUM ALLOWABLE CO2 LEVELS, ASSOCIATED ZONE TERMINAL UNIT MINIMUM POSITION SHALL RESET TO THE HEATING MAXIMUM SETPOINT. IF THE ALLOWABLE CO2 LEVELS CONTINUE TO NOT BE MET, TERMINAL UNIT SHALL CONTINUE TO OPEN AT A RATE OF 10% PER MINUTE. ONCE THE CO2 CONCENTRATION FOR ZONE DROPS TO OUTSIDE AIR CO2 CONCENTRATION PLUS 500 PPM, THE ZONE TERMINAL UNIT SHALL RETURN TO NORMAL OPERATIONS.

AUTOMATIC DEMAND SHED CONTROLS:

BAS SHALL ALLOW FOR AUTOMATIC DEMAND SHED CONTROL. BAS SHALL ALLOW FOR REMOTE SET UP/DOWN OF COOLING AND HEATING TEMPERATURE SETPOINTS BY >4 DEGREES FOR ALL NONCRITICAL ZONES. BAS SHALL ALSO ALLOW FOR

REMOTE RESET TO NORMAL TEMEPRATURE SETPOINTS, AND SHALL BE PROGRAMMED TO PROVIDE AND ADJUSTABLE RATE OF CHANGE FOR THE TEMPERATURE SET UP/DOWN AND RESET. BAS SHALL BE PROGRAMMED TO ALLOW FOR THIS DEMAND SHED SEQUENCE TO BE 1) DISABLED, 2) MANUALLY CONTROLLED, OR 3) AUTOMATICALLY CONTROLLED UPON RECEIPT OF A DEMAND RESPONSE SIGNAL FROM EQUIPMENT.

FAN SPEED CONTROL:

FAN SHALL BE ON DURING OCCUPIED MODE. STARTING FROM A 100% CALL FOR COOLING, FAN SHALL RUN AT DESIGN FAN AIRFLOW AS SCHEDULED.

UNOCCUPIED MODE:

UNOCCUPIED SEQUENCE SHALL BE SIMILAR TO THE OCCUPIED SEQUENCE, BUT SHALL CONTROL TO MAINTAIN UNOCCUPIED SETPOINT.

H C
TT
T
D
V
1 3
2 SYSTEM

SUPPLY AIR
5 CO2 6
SPACE CO2 SENSOR
(WHERE APPLICABLE)

1. ALL CONTROL POINTS FOR BAS CONNECTION FIELD WIRED BY BAS CONTRACTOR

2. SETPOINT DEADBAND TO BE MINIMUM 5 DEGREES

TERMINAL UNIT BAS POINTS LIST

TAG NAME/FUNCTION AI AO DI DO REMARKS
1 SPACE TEMPERATURE √
2 DAMPER POSITION √
3 HEATING WATER VALVE CONTROL √
4 SUPPLY AIR FLOW MEASURING STATION √
5 6
SUPPLY AIR TEMPERATURE √
CO2 SPACE SENSOR (WHERE APPLICABLE) √

TERMINAL UNIT SYSTEM SETPOINTS

DESIGNATION MINIMUM RANGE INITIAL SETPOINT
OCCUPIED HEATING 55-85°F 70° F
OCCUPIED COOLING 55-85°F 75° F
UNOCCUPIED HEATING 55-85°F 60° F
UNOCCUPIED COOLING 55-85°F 80° F
MAXIMUM CO2 CONCENTRATION 600-1000 PPM 900 PPM
4 AFMS

HEATING WATER VALVE CONTROL
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C

PRELIMINARY

NOT FOR

CONSTRUCTION
Not for permits, pricing or other official
purposes. This document has not been
completed or checked and is for general
information or comment only.

Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
1/27/2022 12:01:02 PM

NOT TO SCALE
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Ave. Gardena, CA 90249
<Pick location in Project Information>

MECHANICAL CONTROL DIAGRAM
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SG GY SG 2022.01.28
2014226901
M-702
NOT TO SCALE M-702
1 VAV TERMINAL UNIT CONTROL DIAGRAM
Consultant

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

LUMINAIRES

LOWER-CASE LETTER(S) NEAR LUMINAIRE DENOTE

SWITCH LEG(S)

CIRCUITS

EMERGENCY NORMAL
N/A a

RECESSED RECTANGULAR LUMINAIRE, DRAWN TO
SCALE

SURFACE MOUNTED RECTANGULAR LUMINAIRE,

DRAWN TO SCALE

STRIP LUMINAIRE, LENGTH TO SCALE

WALL MOUNTED RECTANGULAR LUMINAIRE, LENGTH

TO SCALE (NUMBER OF MOUNTING POINTS WILL VARY

WITH THE LUMINAIRE LENGTH AND ARE NOT
INDICATED.)

RECESSED DOWNLIGHT LUMINAIRE

SURFACE MOUNTED CEILING LUMINAIRE

PENDANT MOUNTED LUMINAIRE

LINEAR PENDANT MOUNTED LUMINAIRE, LENGTH TO

SCALE (NUMBER OF MOUNTING POINTS WILL VARY

WITH THE LUMINAIRE LENGTH AND ARE NOT
INDICATED.)

WALL MOUNTED LUMINAIRE

WALL MOUNTED VERTICALLY ORIENTED LUMINAIRE

WALL MOUNTED RECESSED LINEAR LUMINAIRE,

LENGTH TO SCALE

EXIT SIGN, FILLED SIDES INDICATE ILLUMINATED

ANNOTATION, ARROWS INDICATE DIRECTIONAL

GRAPHICS
N/A

WALL MOUNTED EXIT SIGN, FILLED SIDES INDICATE

ILLUMINATED ANNOTATION, ARROWS INDICATE

DIRECTIONAL GRAPHICS
N/A

EXIT SIGN WITH EMERGENCY BATTERY PACK

WALL MOUNTED EXIT SIGN WITH EMERGENCY

BATTERY PACK

EMERGENCY BATTERY PACK, NUMBER OF LAMPS NOT

INDICATED

WALL MOUNTED EMERGENCY BATTERY PACK,

NUMBER OF LAMPS NOT INDICATED

I ILLUMINATED SIGN

RECESSED LINEAR WALL WASH LUMINAIRE, LENGTH

TO SCALE

RECESSED WALL WASH LUMINAIRE
I

WALL MOUNTED ILLUMINATED SIGN

RECESSED ACCENT LUMINAIRE

SURFACE MOUNTED ACCENT LUMINAIRE

SURFACE MOUNTED WALL WASH LUMINAIRE

MONOPOINT LUMINAIRE

TRACK LIGHTING N/A

CONTINUOUS SOURCE LUMINAIRE, PATH AS

INDICATED N/A

WALL MOUNTED MULTI-LAMP ACCENT LUMINAIRE,

NUMBER OF LAMPS NOT INDICATED

UNDERCABINET TASK LUMINAIRE

MULTI-LAMP ACCENT LUMINAIRE, NUMBER OF LAMPS

NOT INDICATED

FIBER OPTIC REMOTE SOURCE

STEP LUMINAIRE
I

NIGHT LIGHT
N

OVERCOUNTER TASK LUMINAIRE

LUMINAIRE IDENTIFICATION, SEE LUMINAIRES

SCHEDULE N/A
L01

EMERGENCY WITH REMOTE BATTERY PACK, NUMBER

OF LAMPS NOT INDICATED

WALL MOUNTED EMERGENCY WITH REMOTE BATTERY

PACK, NUMBER OF LAMPS NOT INDICATED

PENDANT MOUNTED ACCENT LUMINAIRE
N/A
N/A
N/A
N/A
N/A
N/A
N I

WALL MOUNTED STROBE LIGHT

PENDANT MOUNTED WALL WASH LUMINAIRE

RECESSED VOLUMETRIC LUMINAIRE, DRAWN TO
SCALE

LINEAR PENDANT MOUNTED WALL WASH LUMINAIRE,

LENGTH TO SCALE

LIGHTING CONTROLS

LOWER-CASE LETTER(S) NEAR SWITCH DENOTE
SWITCH LEG(S) a

SINGLE POLE SWITCH
THREE-WAY SWITCH 3

OCCUPANCY SENSOR SWITCH O

DIMMER SWITCH
J
ELCU
PS

EMERGENCY LIGHTING CONTROL UNIT

OCCUPANCY SENSOR, CEILING MOUNTED

DAYLIGHT PHOTO SENSOR CONTROL, CEILING

MOUNTED
D
OS

ROOM CONTROLLER, CEILING MOUNTED RC

CIRCUITS
RACEWAY CONCEALED IN CEILING OR WALL. EXPOSED
RACEWAY IS ALLOWED ONLY WHERE NOTED.

RACEWAY BELOW SLAB OR UNDERGROUND

RACEWAY UP

RACEWAY DOWN

RACEWAY STUB-OUT WITH BUSHING

RACEWAY CONTINUATION

JUNCTION BOX, CEILING OR ABOVE CEILING MOUNTED

PULL BOX

JUNCTION BOX, WALL MOUNTED
J
PB
J

JUNCTION BOX, IN-GROUND J

SURFACE RACEWAY (HORIZONTAL/VERTICAL)

PLUG STRIP (HORIZONTAL/VERTICAL)

WORK DEFINITION

EXISTING

REMOVE EXISTING

NEW WORK
FUTURE

TEMPORARY, AS NOTED

REMOVE EXISTING ELECTRICAL EQUIPMENT
???
KEY NOTE ?:##

EQUIPMENT IDENTIFICATION

TELECOM OUTLETS

FURNITURE SYSTEMS OUTLET

OUTLET, MOUNTED IN FLOOR BOX

OUTLET, CEILING MOUNTED

OUTLET, MOUNTED IN POKE THRU

TELECOM OUTLET TYPES

OUTLET, MOUNTED IN POWER POLE
# INDICATES QUANTITY OF DATA JACKS, PULLSTRING
ALWAYS PROVIDED. WHERE NO QUANTITY IS NOTED,
2 DATA JACKS AND PULLSTRING.

MOUNTED 3" ABOVE COUNTER BACKSPLASH

BLANK FACEPLATE, ROUGH-IN ONLY

DIRECT CONNECTION TO PANEL

PATIENT MONITORING

PAY TELEPHONE

RACEWAY MOUNTED

WALL MOUNTED TELEPHONE HANDSET OUTLET
#

WIRELESS ACCESS POINT CONNECTION
AC
B
D
M
P
R
W
WAP
OUTLET
TELECOM MISC.

CABLE TRAY

CABLE TRAY WITH FLANGE SIDE RAILS AND LADDER
RUNGS

BUNDLED CABLE SUPPORT, J-HOOK SYSTEM

BUNDLED CABLE SUPPORT, J-HOOK SYSTEM, CEILING

MOUNTED

BUNDLED CABLE SUPPORT, J-HOOK SYSTEM,

PENDANT MOUNTED

GROUND BAR, LENGTH TO SCALE

RAISED FLOOR GROMMET

WAP WIRELESS ACCESS POINT

WAP WIRELESS ACCESS POINT, CEILING MOUNTED

RECEPTACLES CIRCUITS

EMERGENCY NORMAL
SINGLE RECEPTACLE, 120V
N/A
DUPLEX RECEPTACLE, 120V
DOUBLE DUPLEX RECEPTACLE, 120V
RECEPTACLE, NEMA #
COMBINATION RECEPTACLE, NEMA # AND 120V

INDICATES TWIST LOCK
CLOCK RECEPTACLE, 120V
CORD DROP, 120V

MULTI-SERVICE FLOOR BOX (RECEPTACLES/OUTLETS

AS INDICATED)

MULTI-SERVICE POKE THRU (RECEPTACLES/OUTLETS

AS INDICATED)

MULTI-SERVICE POWER POLE
(RECEPTACLES/OUTLETS AS INDICATED)

MULTI-SERVICE ASSEMBLY (RECEPTACLES/OUTLETS

AS INDICATED)
SINGLE RECEPTACLE, 120V, CEILING MOUNTED
DUPLEX RECEPTACLE, 120V, CEILING MOUNTED
DOUBLE DUPLEX RECEPTACLE, 120V, CEILING

MOUNTED
N/A
N/A
N/A
N/A
N/A
INDICATES 15A N/A

RECEPTACLE TYPES

DEDICATED CIRCUIT D

GROUND FAULT CIRCUIT INTERRUPTER G

GROUND FAULT CIRCUIT INTERRUPTER AND TAMPER

RESISTANT GT

ISOLATED GROUND IG

TAMPER RESISTANT T

INTEGRAL USB PORT(S) U

WEATHER RESISTANT COVER WP

SURGE PROTECTOR S

INDICATES FULLY CONTROLLED N/A
FURNITURE SYSTEMS RECEPTACLE, 120V
INDICATES MOUNTED 3" (75 MM) ABOVE COUNTER

BACKSPLASH N/A

ARC FAULT CIRCUIT INTERRUPTER A

ARC FAULT CIRCUIT INTERRUPTER AND TAMPER

RESISTANT AT
#
#
#
#
RECEPTACLE, NEMA #, CEILING MOUNTED ##
CEILING CORD DROP, 120V
SPLIT WIRED RECEPTACLE, 120V, TOP CONTROLLED,

BOTTOM CONSTANTLY ENERGIZED

CONTROLS

FUSED SAFETY SWITCH, FUSE RATING INDICATED

NON-FUSED SAFETY SWITCH

COMBINATION MOTOR STARTER AND FUSED SAFETY

SWITCH, FUSE RATING INDICATED

MOTOR STARTER

MANUAL MOTOR STARTER

ENCLOSED CIRCUIT BREAKER

ENCLOSED CONTACTOR

AUTOMATIC DOOR PUSHPLATE

EMERGENCY SHUTDOWN

DEAD FRONT GFCI

DIRECT DIGITAL CONTROL PANEL
RELAY

THERMOSTAT

TIME CLOCK

VARIABLE FREQUENCY DRIVE

PUSH BUTTON CONTROL STATION
DDC
R
TC
VFD

TOGGLE SWITCH, MOTOR RATED MT

TOUCHLESS AUTOMATIC DOOR OPENER

ELECTRICAL EQUIPMENT

EQUIPMENT CABINET OR PANEL

EQUIPMENT CONNECTION, FILL INDICATES

EMERGENCY CIRCUIT

GROUND BAR
MOTOR CONNECTION, 1Ø
MOTOR CONNECTION, 3Ø

BUS DUCT

BUS DUCT PLUG
B

SURGE PROTECTIVE DEVICE

TRANSFORMER, NOT TO SCALE

TRANSFORMER, DRAWN TO SCALE
SPD
T
T
480V OR 600V POWER PANELBOARD
208V OR 240V POWER PANELBOARD

AUTOMATIC TRANSFER SWITCH ATS

FIRE ALARM

S D DUCT SMOKE DETECTOR

DEMOLITITION GENERAL NOTES

1. DEMOLITION PLANS SHOW EXISTING EQUIPMENT TO BE DISC ONNECTED AND REMOVED. ANY ELECTRICAL EQUIPMENT NOT SHOWN ON THES E DRAWINGS,

THAT ARE LOCATED IN DEMOLISHED WALLS, FLOORS OR CEI LINGS, SHALL BE REMOVED UNLESS OTHERWISE NOTED.

2. DISCONNECT AND REMOVE ALL EXISTING LIGHTING FIXTURE S, RECEPTACLES, ELECTRICAL EQUIPMENT, ETC., AFFECTED B Y THE

RENOVATION, AND REROUTE OR EXTEND EXISTING CONDUIT AND FEEDERS

WHERE NECESSARY TO MAINTAIN THE CIRCUIT CONTINUITY FOR ALL LOADS TO REMAIN.

3. PROTECT ALL EXISTING SYSTEMS WHICH ARE TO REMAIN, I NCLUDING BUT NOT LIMITED TO: TELEPHONE, DATA, FIRE ALARM, SECURI TY, CLOCK, BELL, POWER AND LIGHTING SYSTEMS. ALL EXISTING OUTLETS, H ARDWARE,

CONDUIT AND CONDUCTORS TO REMAIN ARE TO BE SECURED FROM DAMAGE. CONTRACTOR SHALL TEST ALL OUTLETS, HARDWARE , CONDUIT

AND CONDUCTORS PRIOR TO COMMENCEMENT OF WORK, AND P ROVIDE A

WRITTEN REPORT TO OWNER/ARCHITECT, INDICATING ANY F AILURES OR DAMAGE.

4. ALL ELECTRICAL FIXTURES, OUTLETS, DEVICES, ETC., TH AT ARE TO BE

DISCONNECTED AND REMOVED, SHALL BE REMOVED COMPLETE LY,

INCLUDING ASSOCIATED CONDUIT AND WIRING BACK TO THE LAST ACCESSIBLE J -BOX, OUTLET, DEVICE OR FIXTURE REMAINING IN SERVICE .

5. ALL ABANDONED OUTLETS INCLUDING LIGHT, RECEPTACLES, TELEPHONE, ETC., SHALL BE COVERED AND PATCHED TO MATCH THE FIN ISH OF SURROUNDING WALL OR CEILING.

6. EXISTING CONDUIT FEEDS UP THROUGH FLOOR SHALL BE CU T OFF AND PLUGGED FLUSH WITH FLOOR WHERE EXISTING WALLS, ETC. , ARE REMOVED. REMOVE CONDUCTORS FROM THIS POINT BACK TO LAST ACCESSIBLE J -BOX, OUTLET, DEVICE OR FIXTURE REMAINING IN SERVICE .

7. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR T O MAINTAIN CONTINUITY OF ALL ELECTRICAL SYSTEMS, EQUIPMENT, ET C., REMAINING IN OPERATION WHICH ARE BEING FED BY AN ABANDONED OUTLE T.

MAINTAINING CONTINUITY SHALL CONSIST OF REROUTING C ONDUIT, WIRING, ETC., AS REQUIRED.

8. EXISTING CIRCUITS WHICH ARE REMOVED AND NOT REUSED SHALL BE IDENTIFIED ON THE PANEL SCHEDULE AS "SPARE".

FIRE LIFE SAFETY NOTES

1. UNDER DESIGN/BUILD SCOPE OF WORK PROVIDE COMPLETE F IRE/LIFE SAFETY SYSTEM. CONTRACTOR SHALL PROVIDE AS PART OF FIRE ALARM SYSTEM:

A. CONSTRUCTION DOCUMENT AND SHOP DRAWINGS.

B. COORDINATE WITH MECHANICAL AND PLUMBING DRAWINGS FO R

ALL REQUIRED FIRE ALARM DEVICES UNDER

MECHANICAL/PLUMBING SECTION AND PROVIDE INTERCONNEC TING WIRING FOR A COMPLETE WORKING SYSTEM.

2. PROPOSED SYSTEM DOCUMENTS SHALL BE PREPARED AND SUB MITTED TO

AUTHORITIES HAVING JURISDICTION FOR REVIEW AND APPR OVAL BY CONTRACTOR BEFORE START OF WORK.

3. COMPLETE SYSTEM SHALL BE TESTED, APPROVED AND SIGNE D -OFF BY AUTHORITIES HAVING JURISDICTION.

4. THE ENTIRE INSTALLATION OF LIFE SAFETY SYSTEM INCLU DING MATERIALS

AND EQUIPMENT SHALL BE COMPATIBLE WITH BASE BUILDIN G EQUIPMENT

AND MEET OR EXCEED THE MINIMUM STANDARD AND REQUIRE MENTS OF THE FOLLOWING:

A. U.L. LISTING SERVICES
B. N.F.P.A. NATIONAL FIRE CODE
C. U.B.C. AS ACCEPTED AND OR MODIFIED BY LOCAL AUTHORI TIES D. CITY FIRE AND BUILDING CODE
E. CITY ELECTRICAL CODE
F. STATE OF CALIFORNIA
G. AMERICAN DISABILITY ACT (ADA REQUIREMENTS)

FIRE ALARM LIFE SYSTEM SHALL BE

SUBMITTED UNDER A SEPERATE PERMIT
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:21:53 AM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

SYMBOLS AND ABBREVIATIONS,

ELECTRICAL SHEET INDEX
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/28/16
2014226900
E-001

ABBREVIATIONS

MW MICROWAVE OVEN

N NEUTRAL

NAC NOTIFICATION APPLIANCE CIRCUIT

NC NORMALLY CLOSED

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER
P POLE

PA PUBLIC ADDRESS

PB PULL BOX

PD PUNCHDOWN

PF POWER FACTOR

PNL PANEL

POE POINT OF ENTRANCE

POS POINT OF SERVICE

PR PAIR

PT POTENTIAL TRANSFORMERS

PTS PNEUMATIC TUBE STATION

PTZ PAN/TILT/ZOOM

PV PHOTOVOLTAIC

PVC POLYVINYL CHLORIDE

PWR POWER

RA RETURN AIR

REC RECESSED

RECP RECEPTACLE

REQD REQUIRED

REX REQUEST TO EXIT

RM ROOM

RNC RIGID NON-METALLIC CONDUIT

RO RACEWAY ONLY

RPC REVERSE PHASE CUT

RSC, RGS RIGID STEEL CONDUIT

SCCR SHORT CIRCUIT CURRENT RATING

SEC SECURITY

SECT SECTION

SIM SIMILAR

ST SHUNT TRIP

STD STANDARD

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

SYS SYSTEM

TBB TELECOMMUNICATIONS BACKBONE

TC TEMPERATURE CONTROL OR

TERMINAL CABINET

TE TELECOMMUNICATIONS

ENCLOSURE

TELE TELEPHONE

TELECOM TELECOMMUNICATIONS

TEMP TEMPERATURE

TERM TERMINAL

TGB TELECOMMUNICATIONS GROUND
BAR

TMGB TELECOMMUNICATIONS MAIN

GROUND BAR

TOF TOP OF FIXTURE

TP TAMPER RESISTANT

TR TELECOMMUNICATIONS ROOM

TSP TWISTED SHIELDED PAIR

TSTAT THERMOSTAT

TTB TELECOM TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UNV UNIVERSAL VOLTAGE

UPS UNINTERRUPTIBLE POWER SUPPLY

USB UNIVERSAL SERIAL BUS

UTP UNSHIELDED TWISTED PAIR

UV UNIT VENTILATOR

V VOLTS

VA VOLT-AMPS

VAV VARIABLE AIR VOLUME

VC VOLUME CONTROL

VDT VISUAL DISPLAY TERMINAL

VOL VOLUME

VT VAPOR TIGHT

W WIRE, WATT

WAP WIRELESS ACCESS POINT

WG WIREGUARD

WL WET LOCATION

WP WEATHERPROOF

WT WATERTIGHT

XFMR TRANSFORMER
Ø, PH PHASE

ABBREVIATIONS

EF EXHAUST FAN

ELEC ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EM GEN EMERGENCY GENERATOR

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EXTER EXTERIOR

F&I FURNISHED AND INSTALLED

FA FIRE ALARM

FAA FIRE ALARM ANNUNCIATOR

FACP FIRE ALARM CONTROL PANEL

FB FLOOR BOX

FCU FAN COIL UNIT

FLR FLOOR

FLUOR FLUORESCENT

FO FIBER (FIBRE) OPTIC

FOH FRONT OF HOUSE

FP FIRE PROTECTION

FPC FORWARD PHASE CONTROL

FS FUSIBLE SWITCH

FSCS FIRE FIGHTER SMOKE CONTROL

STATION

FU FUSE

FVNR FULL VOLTAGE NON REVERSING

FVR FULL VOLTAGE REVERSING

G, GND GROUND

G/Y GREEN YELLOW

GA GAUGE

GAL GALLONS

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI, GFCI GROUND FAULT (CIRCUIT)

INTERRUPTER

H HOT CONDUCTOR

HC HORIZONTAL CROSS CONNECT

HD HAND DRYER

HFF HANDS FREE FIXTURE

HH HANDHOLE

HID HIGH INTENSITY DISCHARGE

HK HOUSE KEEPING PAD

HM HORIZONTALLY MOUNTED

HOA HAND-OFF-AUTO

HOR HORIZONTAL

HP HORSEPOWER

HT HEIGHT

HTG HEATING

HV HIGH VOLTAGE

HVCB HIGH VOLTAGE CIRCUIT BREAKER

HW HOT WATER

HZ HERTZ

IC INTERMEDIATE CROSS CONNECT

ID INSIDE DIAMETER

JB JUNCTION BOX

K KIRK KEY INTERLOCK

KAIC KILO-AMPS INTERRUPTING

CAPACITY

KV KILOVOLT

KVA KILOVOLT-AMPERES

KW KILOWATT

LED LIGHT EMITTING DIODE

LR LEGALLY REQUIRED

LS LIFE SAFETY BRANCH

LSIG LONG TIME, SHORT TIME,

INSTANTANEOUS, GROUND FAULT

LTG LIGHTING

LV LOW VOLTAGE

MAU MAKE UP AIR UNIT

MAX MAXIMUM

MC METAL CLAD CABLE

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MCCB MOLDED CASE CIRCUIT BREAKER

MCP MOTOR CIRCUIT PROTECTOR

MCT MAIN CROSS CONNECT

MDF MAIN DISTRIBUTION FRAME

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MET MAIN EARTHING TERMINAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUG ONLY

MM MULTIMODE FIBER (FIBRE) OPTIC
STRAND

MSB MAIN SWITCHBOARD

MTD MOUNTED

MV MEDIUM VOLTAGE

MVCB MEDIUM VOLTAGE CIRCUIT

BREAKER

ABBREVIATIONS
#/C MULTI-CONDUCTOR, # INDICTATES

QUANTITY
(D) DEMOLISH
(E) EXISTING
(N) NEW
(R) EXISTING TO BE RELOCATED
1/C SINGLE CONDUCTOR
A AMPS

A/C AIR CONDITIONING UNIT

AC ALTERNATING CURRENT

ACH ABOVE COUNTER HEIGHT

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJUSTABLE

AF AMP FRAME/ FUSE

AFC ABOVE FINISHED CEILING

AFCI ARC FAULT CIRCUIT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ARCH ARCHITECTURAL

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

AVG AVERAGE

AWG AMERICAN WIRE GAUGE

BC BONDING CONDUCTOR

BCU BARE COPPER

BFG BELOW FINISHED GRADE

BKR BREAKER

BLDG BUILDING

BOF BOTTOM OF FIXTURE

BOH BACK OF HOUSE

BTM BOTTOM

C CONDUIT

C/W COMPLETE WITH

CAP CAPACITY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CEC CANADIAN ELECTRIC CODE

CFOI CONTRACTOR FURNISHED, OWNER

INSTALLED

CIRC CIRCULATING

CKT CIRCUIT

CL CENTERLINE

CLG CEILING

CM CEILING MOUNTED

CMU CONCRETE MASONRY UNIT

CO CONDUIT ONLY

COMM COMMUNICATIONS

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

CPT CONTROL POWER TRANSFORMER

CPU CENTRAL PROCESSING UNIT

CR CRITICAL BRANCH

CT CURRENT TRANSFORMERS

CTR CENTER

CU COPPER

CUH CABINET UNIT HEATER

D DEDICATED

DALI DIGITAL ADDRESSABLE LIGHTING

INTERFACE

DC DIRECT CURRENT

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DISC DISCONNECT

DIV DIVISION

DL DAMP LOCATION

DMX DIGITAL MULTIPLEX

DMX-RDM DIGITAL MULTIPLEX REMOTE

DEVICE MANAGEMENT

DN DOWN

DP DISTRIBUTION PANEL

DPDT DOUBLE POLE, DOUBLE THROW

DPR DAMPER

DPST DOUBLE POLE, SINGLE THROW

DWG DRAWING

DWH DOMESTIC WATER HEATER

EA EACH

EC ELECTRICAL CONTRACTOR

DRAWING INDEX
NO. DRAWING NAME
E-001 SYMBOLS AND ABBREVIATIONS, ELECTRICAL SHEET IN DEX E-002 TITLE 24 COMPLIANCE FORMS
E-003 TITLE 24 COMPLIANCE FORMS
ED101 DEMOLITION POWER GROUND FLOOR PLAN AND ROOF PL AN ED201 DEMOLITION LIGHTING GROUND FLOOR PLAN
E-101 POWER GROUND FLOOR PLAN AND ROOF
E-201 LIGHTING GROUND FLOOR PLAN
E-501 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-601 SINGLE LINE DIAGRAM - NORMAL
E-602 SINGLE LINE DIAGRAM - EMERGENCY
E-701 PANEL SCHEDULES
E-702 PANEL SCHEDULES
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:21:54 AM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>
TITLE 24 COMPLIANCE FORMS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/23/21
2014226900
E-002
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:21:54 AM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>
TITLE 24 COMPLIANCE FORMS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/23/21
2014226900
E-003
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
T
ATS
T
2 1
(EXIST)

UNIFORM
23 (EXIST)
MENS

RESTROOM
SHOWER
22 (EXIST) MEN
QUIET
25 (EXIST) OPS

MANAGER
3 HALLWAY
15 (EXIST)

TRAINING
ROOM
30 (EXIST) AV
EQUIP
29 (EXIST)
ELEC
28 (EXIST)

COMP SRV

DATA COM
70 A
B
D
C
DP1
DP1
DP1
DP1 DP1 DP1 DP1 DP1
DP1
DP1
DP1
DP1
DP1
DP1
DP1
DP1 DP1
DP1
DP1
DP1
DP1
DP2
DP1

DISPATCH

SUPERVISORS CONFERENCE
2 1
A
B
D
C
HP -A1
A
DP3
DP4
DP5
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:19 AM
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

DEMOLITION POWER GROUND

FLOOR PLAN AND ROOF PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 03/09/21
2014226900
ED101
# KEY NOTES
DP1 EXISTING RECEPTACLE TO BE
DISCONNECTED AND REMOVED.

DP2 EXISTING FIRE ALARM PANELS

AND GENERATOR MONITORING
PANEL TO BE RELOCATED. SEE
E-101 FOR NEW LOCATIONS OF
EXISTING EQUIPMENT.

DP3 FIELD VERIFY CONDITION AND
INTEGRITY OF EXISTING 30A

DISCONNECT FOR REMOVED
HP-A1 AND REUSE FOR NEW
RTU-1 IF FOUND TO BE IN

ACCEPTABLE, SERVICEABLE
CONDITION. SEE SINGLE LINE
DIAGRAM ON E-601 FOR
ADDITIONAL INFORMATION.

DP4 EXISTING MECHANICAL UNIT
HP-A1 TO BE REMOVED.

DP5 EXISTING ROOF MOUNTED
RECEPTACLE TO REMAIN.
1/8" = 1'-0" ED101
1 DEMOLITION POWER GROUND FLOOR PLAN
1/8" = 1'-0" ED101
2 POWER ROOF PLAN
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
2 1

HALLWAY
15 (EXIST)

UNIFORM
23 (EXIST)
MENS

RESTROOM
SHOWER
22 (EXIST) MEN
QUIET
25 (EXIST)

TRAINING
ROOM
30 (EXIST) AV
EQUIP
29 (EXIST)
ELEC
28 (EXIST)

COMP SRV

DATA COM
70 A
B
D
C
DL1 .
.DL1
.DL1 DL1
DL1
.
.
2 1
A
B
D
C
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:20 AM
1/8" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

DEMOLITION LIGHTING GROUND

FLOOR PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 03/09/21
2014226900
ED201
# KEY NOTES
DL1 DISCONNECT AND REMOVE ALL

EXISTING LIGHTING OUTLETS,

FIXTURES, AND CONTROL
DEVICES WITHIN THIS AREA.
1/8" = 1'-0" ED201
1 DEMOLITION LIGHTING GROUND FLOOR PLAN
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
IC
35E
SL
35L IC
35E
ST
IC
35E
ST
24 TC 30 TC
24TC 24 TC 30 TC
24TC 24 TC 30 TC
24TC
7045-500
BBF
C1R C1R C1L C1L
722 8 B AS E B AR
4272
24 35X24T 35X30T
M-HALRECR 35X24T BIF
30EPS
7 2 2 8 B A S E B A R
4 2 7 2
T
ATS
T

M P X M - P F C S T M A X
M P X M - P F X C - 3 5 E M A X
M P X M - P F X C - S M A X M P X M - P F C 3 5 P T N M A X M P X M - P F C S T M A X M P X M - P F X C - 3 5 E M A X

M P X M - P F X C - S M A X
M P X M - P F C 3 5 P L N M A X M P X M - P F C S L M A X M P X M - P F X C - 3 5 E M A X

M P X M - P F X C - S M A X
M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M S R M - L F W T 1 8 4 2 E M A X
M W T M - U R W 2 4 5 4 M A X
M W T M - U R W 2 4 5 4 M A X
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
M P X M - A C C R A I L 3 0 M A X M P X M - A C C R A I L 3 0 M A X M P X M - A C C R A I L 2 4 M A X M P X M - A C C R A I L 2 4 M A X M S R M - L F 3 4 2 - A M A X
M S R M - L F 5 4 2 - A M A X
M S R M - L F 5 4 2 - A M A X
M S R M - I C P M 2 7 1 5 2 4 B B F L M A X
M T B M - M X H A W 2 4 5 4 M A X

M T B M - H A L R E C R M A X
M T B M - H A R E C 3 S 2 L C F M A X
M W T M - C 1 L M A X
M W T M - C 1 R M A X
M W T M - C 1 R M A X
M P X M - E P F 2 M A X
M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E P S 2 4 M A X
N L 2 1 5 N 4 2 7 2 W G L K N O F
N L 1 N 8 3 G M 4 L M N O F
N L 1 N 8 3 G M 4 L M N O F
M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M S U M - D X L O H 1 4 6 0 D M A X
M S U M - D X L S L F 2 3 0 M A X
M S U M - D X L E P 3 0 M A X
M W T M - U R W 2 4 6 0 M A X
M T B M - M X H A W 3 0 8 4 S M A X
N L 2 1 5 N 4 2 7 2 W G L K N O F
4 2 7 2
7 2 2 8 B A S E B A R
30EPS
BIF
30 24 30 24
35X24T M-HALRECR
35X30T 35X24T
30 24
24 4272
722 8 B AS E B AR
C1L C1L C1R C1R
BBF
7045-500
24TC 30 TC 24 TC
24TC 30 TC 24 TC
24TC 30 TC 24 TC
ST
35E
IC 35T
ST
35E
IC
35L
SL
35E
IC
J J
J
J
S D
2 1
AEL AEH A1L
A1H ADH
ADL
AET
A4L A3L
+59"
+39"
+48"
+46"
+46"
+32"
+60"
+60"
+56"

SUPERVISORS
7 INTERVIEW
5 PARA

TRANSIT
4 VESTIBULE
3 DISPATCH
1 STANDBY
2 HALLWAY
15 (EXIST)
ELEC
28 HALLWAY
15 (EXIST) AV
EQUIP
29 (EXIST)

UNIFORM
23 (EXIST) MEN
QUIET
25 (EXIST)

COMP SRV

DATA COM
70 (EXIST) OPS

MANAGER
3 (EXIST)
WOMAN
QUIET
24 (EXIST)
MENS

RESTROOM
SHOWER
22 (EXIST)

DRIVER'S
ROOM
20 HALLWAY
15 (EXIST)

KITCHEN
21 (EXIST)

TRAINING
ROOM
30 AT1
+42"
+42"
CPA
A
B
D
C
A4L -14
A4L -14
A4L -14
A4L -14
A4L -14
A4L -14
A4L -14
A4L -18
A4L -16 A4L -16
A4L -16
A4L -16
A4L -16
A4L -12
A4L -12
A4L -12
A4L -12
A4L -15
A4L -15
A4L -12
A4L -19
A4L -17
A4L -13
A4L -13 A4L -13
A4L -1
A4L -1
A4L -10
A4L -10
A4L -10
A4L -10
A4L -3
A4L -5
A4L -11
A4L -11 A4L -11
P3
A4L -11
A4L -18
A4L -15
A4L -15
+48"
A4L -15
A4L -12
A4L -13
A4L -5
A4L -3
A4L -13
A4L -1
A4L -10
P7 P7
P7
P7
1 A4L -11
1 A4L -15
1 2 1
A
B
D
C
RTU -1
POWER

EXHAUST
RTU -1
A
P5
A-26,28,30
P6
(E) A2L -8
A-2,4,6
P2
P2

GENERAL NOTES

1. ALL ELECTRICAL OUTLETS AND DEVICES SHOWN ON THIS PL AN ARE (N): NEW, UNLESS OTHERWISE NOTED AS (E): EXISTING TO REMAIN, (R): EXISTING TO BE RELOCATED, OR (D): TO BE DISCONNECTED AND REMOVE D.

2. ALL HOMERUNS, CIRCUITING AND ELECTRICAL CONNECTIONS SHOWN ON THIS PLAN ARE (N): NEW, UNLESS OTHERWISE NOTED.

3. COORDINATE FINAL LOCATION OF ALL OUTLETS, DEVICES A ND

CONNECTIONS WITH OTHER SUBCONTRACTORS TO AVOID CONF LICT OF REQUIRED ACCESS.

4. VERIFY EXACT LOCATIONS AND ELEVATIONS OF ALL OUTLET S WITH ARCHITECTURAL DRAWINGS PRIOR TO ROUGH -INS.

5. PROVIDE A PERMANENT LABEL FOR EACH RECEPTACLE SHOWN ON POWER

PLANS, SHOWING PANEL NAME AND CIRCUIT NUMBER USED F OR POWER SOURCE.

6. ALL EXISTING J -BOXES OR OTHER ELECTRICAL, TELECOM, AND LIFE SAFETY

DEVICES TO REMAIN WHICH ARE IN CONFLICT WITH NEW AR CHITECTURE, OR

WILL BE LOCATED IN AN INACCESSBILE SPACE DUE TO ARC HITECTURAL,

STRUCTURAL OR MECHANICAL REVISIONS AS PART OF THIS PROJECT, ARE TO BE RELOCATED TO AN ACCESSIBLE LOCATION. PROVIDE AND EXTEND CONDUIT AND WIRING AS REQUIRED FOR SUCH RELOCATION.

7. UNLESS OTHERWISE NOTED, ALL MECHANICAL EQUIPMENT SH OWN WITH NEW ELECTRICAL CONNECTIONS ARE (N): NEW.

8. VERIFY FINAL LOCATION OF ALL MECHANICAL EQUIPMENT W ITH MECHANICAL CONTRACTOR PRIOR TO ROUGH -INS.

9. COORDINATE FINAL LOCATION OF ALL DISCONNECT SWITHCE S FOR

MECHANICAL EQUIPMENT WITH MECHANICAL CONTRACTOR PRI OR TO ROUGH -INS.

10. PROVIDE 3/4 ” CONDUIT WITH PULL STRING FROM EACH THERMOSTAT TO RESPECTIVE MECHANICAL EQUIPMENT.

11. PROVIDE CONDUIT AND WIRING FOR ALL CONTROL CONNECTI ONS INDICATED AS PART OF ELECTRICAL CONTRACTOR ’S WORK ON MECHANICAL PLANS.

12. VERIFY THAT AT LEAST ONE EXISTING 120V, 15A OR 20A RECEPTACLE WITH

GFCI AND WHILE -IN -USE WEATHERPROOF ENCLOSURE IS INSTALLED WITHIN 25 ’ OF ALL NEW ROOFTOP MECHANICAL EQUIPMENT, OR PROVIDE NEW AS REQUIRED AND CONNECT TO AN EXISTING ROOFTOP RECEPTA CLE CIRCUIT.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:02 AM
As indicated
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

POWER GROUND FLOOR PLAN AND
ROOF
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
RAC PE SB 01/28/2022
2014226900
E-101
1/8" = 1'-0" E-101
1 POWER GROUND FLOOR PLAN
# KEY NOTES
P2 SEE SINGLE LINE DIAGRAM ON E-601 FOR EQUIPMENT
FEEDER INFORMATION.

P3 NEW LOCATION OF EXISTING FIRE ALARM PANELS AND
GENERATOR MONITORING PANEL. PROVIDE ALL WIRE,

CONDUIT, BOXES, HARDWARE AND ACCESSORIES TO

EXTEND ALL EXISTING POWER AND LOW VOLTAGE

CONNECTIONS FOR ALL RELOCATED EQUIPMENT TO NEW
LOCATION.

P5 RE-USE EXISTING 30A DISCONNECT FOR REMOVED HP-A1 IF

IN ACCEPTABLE, SERVICEABLE CONDITION OR PROVIDE
NEW DISCONNECT FOR NEW RTU-1. SEE SINGLE LINE
DIAGRAM ON E-601 FOR ADDITIONAL INFORMATION.

P6 PROVIDE NEW DISCONNECT FOR NEW RTU-1 POWER
EXHAUST. SEE SINGLE LINE DIAGRAM ON E-601 FOR
ADDITIONAL INFORMATION.

P7 FOR CARD READER PROVIDE 1" CONDUIT BACK TO CEILIN G
MOUNTED JUNCTION BOX ON SECURE SIDE OF DOOR.

COORDINATE REQUIREMENT WITH DOOR HARDWARE.
1/8" = 1'-0" E-101
2 POWER ROOF PLAN
1 Owner Revisions 05/20/2022 SB PE
05/24/2022
-
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 -
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 -
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 -
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
IC
35E
SL
35L IC
35E
ST
IC
35E
ST
24 TC 30 TC
24TC 24 TC 30 TC
24TC 24 TC 30 TC
24TC
7045-500
BBF
C1R C1R C1L C1L
722 8 B AS E B AR
4272
24 35X24T 35X30T
M-HALRECR 35X24T BIF
30EPS
7 2 2 8 B A S E B A R
4 2 7 2
T
OS
ATS
T
OS
PS OS
OS
OS
OS
PS
OS
OS
PS
RC
RC RC
RC
RC
RC
RC
RC

M P X M - P F C S T M A X
M P X M - P F X C - 3 5 E M A X
M P X M - P F X C - S M A X M P X M - P F C 3 5 P T N M A X M P X M - P F C S T M A X M P X M - P F X C - 3 5 E M A X

M P X M - P F X C - S M A X
M P X M - P F C 3 5 P L N M A X M P X M - P F C S L M A X M P X M - P F X C - 3 5 E M A X

M P X M - P F X C - S M A X
M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M S R M - L F W T 1 8 4 2 E M A X
M W T M - U R W 2 4 5 4 M A X
M W T M - U R W 2 4 5 4 M A X
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
M P X M - A C C R A I L 3 0 M A X
M P X M - A C C R A I L 3 0 M A X
M P X M - A C C R A I L 2 4 M A X
M P X M - A C C R A I L 2 4 M A X
M S R M - L F 3 4 2 - A M A X
M S R M - L F 5 4 2 - A M A X
M S R M - L F 5 4 2 - A M A X
M S R M - I C P M 2 7 1 5 2 4 B B F L M A X
M T B M - M X H A W 2 4 5 4 M A X

M T B M - H A L R E C R M A X
M T B M - H A R E C 3 S 2 L C F M A X
M W T M - C 1 L M A X
M W T M - C 1 R M A X
M W T M - C 1 R M A X
M P X M - E P F 2 M A X
M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E P S 2 4 M A X
N L 2 1 5 N 4 2 7 2 W G L K N O F
N L 1 N 8 3 G M 4 L M N O F
M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M S U M - D X L O H 1 4 6 0 D M A X
M S U M - D X L S L F 2 3 0 M A X
M S U M - D X L E P 3 0 M A X
M W T M - U R W 2 4 6 0 M A X
M T B M - M X H A W 3 0 8 4 S M A X
N L 2 1 5 N 4 2 7 2 W G L K N O F
4 2 7 2
7 2 2 8 B A S E B A R
30EPS
BIF
30 24 30 24
35X24T M-HALRECR
35X30T 35X24T
30 24
24 4272
722 8 B AS E B AR
C1L C1L C1R C1R
BBF
7045-500
24TC 30 TC 24 TC
24TC 30 TC 24 TC
24TC 30 TC 24 TC
ST
35E
IC 35T
ST
35E
IC
35L
SL
35E
IC
2 1
Oc
D3a
D3a
D3a
D3a
L1
L1
L1
L1
L1
L1
L1 L1 L1
L1
L1
L1 L1 L1
L4
L1A
L2
Da
D3a,b
D3a
Da L1 L1 L1
L1 L1
EXT -1
EXT -1
EXT -1
EXT -1
EXT -1
EXT -1
L5

SUPERVISORS
7 INTERVIEW
5 PARA

TRANSIT
4 DISPATCH
1 STANDBY
2 VESTIBULE
3 HALLWAY
15 (EXIST)

UNIFORM
23 (EXIST)

DRIVER'S
ROOM
20 (EXIST) MEN
QUIET
25 (EXIST)
WOMAN
QUIET
24 HALLWAY
15 (EXIST)
ELEC
28 (EXIST)

COMP SRV

DATA COM
70 (EXIST) AV
EQUIP
29 (EXIST)

TRAINING
ROOM
30 (EXIST) OPS

MANAGER
3 (EXIST)
MENS

RESTROOM
SHOWER
22 A
B
D
C
ac
a,b
a,b b a,b
a a
a
a
a
a a a
aa
a
a
a
a
a
b
a
b
b
b
b
b
a
Db

PRIMARY

DAYLIGHTING
ZONE

SECONDARY

DAYLIGHTING
ZONE
AEL AEH A1L
A1H ADH
ADL
AET
A4L A3L
AT1
CPA
L1A L1A
aaa
L1A a
L1A
L2
(TYP)
D3a,b
D3a
A1H -42
2#10+1#10GND -3/4"C
L1
b

GENERAL NOTES

1. CIRCUIT ALL NEW LIGHT FIXTURES TO PANEL A1H -42 AND SPARE RELAY IN PANEL CPA -12. UNLESS OTHERWISE NOTED

2. ALL LIGHT FIXTURES SHOWN ON THIS PLAN ARE (N): NEW, UNLESS OTHERWISE NOTED AS (E): EXISTING TO REMAIN, (R): EX ISTING TO BE RELOCATED, OR (D): TO BE DISCONNECTED AND REMOVED.

3. ALL LIGHTING CONTROL EQUIPMENT AND DEVICES, AND ALL CIRCUITING AND CONNECTIONS SHOWN ON THIS PLAN ARE (N): NEW, UNLESS OTHERWISE NOTED.

4. ALL CEILING MOUNTED LIGHT FIXTURES SHALL BE SUPPORT ED DIRECTLY FROM THE BUILDING STRUCTURE. FIXTURES SHALL NOT BE SUPPORTED

FROM PIPING, DUCTWORK OR ANY OTHER EQUIPMENT, OR SO LELY FROM SUSPENDED CEILINGS.

5. VERIFY MOUNTING HEIGHT OF ALL SUSPENDED OR STEM -MOUNTED FIXTURES WITH ARCHITECT PRIOR TO INSTALLATION.

6. ALL DIMMER/SWITCH LOCATIONS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO ROUGH -INS.

7. WHERE MULTIPLE DIMMERS/SWITCHES ARE SHOWN, SWITCHES SHALL BE GANGED UNDER A COMMON WALL PLATE.

8. PROVIDE ADDITIONAL EXIT SIGN(S) IF REQUIRED BY THE CITY FIRE MASHALL.

9. PROVIDE PERMANENT LABELS OR MARKINGS IDENTIFYING AL L BOXES AND ENCLSOSURES FOR EMERGENCY CIRCUITS.

10. ALL EXIT SIGN LIGHTING WILL BE CONNECTED TO UNSWITC HED LIGHTING CIRCUIT(S) SERVING THE SAME ROOM.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:12 AM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

LIGHTING GROUND FLOOR PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 03/09/21
2014226900
E-201
# KEY NOTES
L1 CONNECT NEW LIGHT FIXTURE TO
EXISTING RELAY CPA-7.

L2 PROVIDE NEW ROOM CONTOLLER ABOVE

CEILING FOR LIGHTING CONTROL IN THE
ROOM. PROVIDE ACCESS PANEL FOR

WHERE THE NEW ROOM CONTROLLER TO
BE LOCATED ABOVE GYP BOARD CEILING.

COORIDNATE WITH GENERAL
CONTRACTOR (G.C.).
1/8" = 1'-0" E-201
1 LIGHTING GROUND FLOOR PLAN
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

FLASHING

NO RIGID

CONTACT

TYPICAL
PIPE

CONTINUOUS

RESILANT SEALANT
1" MIN CLEARANCE
(PACK WITH FIBERGLASS)

ROOF FLOOR
SLAB

COORDINATE WITH OWNER FOR EXACT

METHOD OF PENETRATION PRIOR TO
INSTALLATION AND ROUGH-IN.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:12 AM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

LIGHTING FIXTURE SCHEDULE AND

DETAILS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/22/21
2014226900
E-501
EXT-1 LED EDGE-LIT EXIT SIGN WITH

GREEN LETTERS ON WHITE

BACKGROUND, BRUSHED

ALUMINUM HOUSING, QTY OF

FACES PER PLANS,

DIRECTIONAL ARROWS PER
PLANS, AC OPERATION. Provided
with rough-in section.
* PROVIDE 5 YEAR WARRANTY
ON COMPLETE LUMINAIRE...

LITHONIA:

LRP-number of faces per
plans-GW-arrows per
plans-120/277-mounting per
plans
-- -- LED
GREEN
4 120-277 * WATTAGE INDICATED IS
FOR DOUBLE-FACE SIGN.

L5 UNDERCABINET FIXTURE WITH

INTEGRATED LED ENGINE,
MODULAR INSTALLATION, 24in
LONG x 1/2in TALL X 1-1/4in WIDE,
WITH 277V - 24v TRANSFORMER,
BRUSHED NICKEL FINISH.
* PROVIDE 5 YEAR WARRANTY

ON COMPLETE LUMINAIRE
SYSTEMS.

LITHONIA:

RAZ-24IN-30K-90CRI-RAZTRAN
S24 MVOLT
-- -- LED 3000K
950 LUMENS
90 CRI
18 120-277 * PROVIDED WITH
MULTI-VOLTpri / 24Vsec
TRANSFORMER.
* CONTRACTOR SHALL

PROVIDE AND INSTALL ALL

NECESSARY POWER

CABLING AND MOUNTING

HARDWARE FOR A

COMPLETE AND

FUNCTIONAL INSTALLATION
OF THREE FIXTURES...

L4 3in SQUARE LED RECESSED
DOWNLIGHT, 50° OPTICAL
CUTOFF, 5in DEEP, ANODIZED

ALUMINUM CLEAR DIFFUSE

REFLECTOR, QUICK-CONNECT

LIGHT ENGINE POWER PACK

ACCESSIBLE FROM BELOW
CEILING, 33 DEGREE BEAM,
MATTE WHITE FLANGE.
* PROVIDE 5 YEAR WARRANTY
ON COMPLETE LUMINAIRE...

LIGHTOLIER:
3S-N,
C3L-05-9-40-S-Z10-U,
C3S-DL-N-CD
-- -- LED 4000K
500 LUMENS
90CRI
7 120-277 * 0-10V 1% DIMMING.
* INSTALLED IN ACT TILE
CEILING.

L2 LINEAR LED DIRECT OPTIC
PENDANT, NOMINALLY 3in TALL x
2-1/2in APERTURE x LENGTH PER

PLANS, EXTRUDED ALUMINUM
HOUSING, 72in SUSPENSION

CABLE LENGTH, EXTRUDED

ACRYLIC LENS, ADJUSTABLE
SLIDE-MOUNT HANGER. Y-SHAPE

AIRCRAFT CABLE SUSPENSION,

QUICK CONNECT/RELEASE
CABLE GRIPS, WHITE FINISH.
* PROVIDE 5 YEAR WARRANTY
ON DEFECTIVE LEDs, BOARDS,
DRIVERS AND HOUSING.

AXIS LIGHTING:

B2SQDLED-1000-80-40-SO-

LENGTH PER
PLANS-W-UNV-DP-1-CA(72
")
-- -- LED 4000K
1000 lum/ft
10 w/ft 120-277 * MOUNTING HEIGHT SHALL
BE +9'-0" AFF TO BOTTOM OF
FIXTURE.
* SUSPENSION LENGTH IS
APPROX. 4'-6".

CONTRACTOR SHALL

PROVIDE ALL NECESSARY
SEISMIC BRACING.
* 0-10V 1% DIMMING.

L1A SIMILAR TO TYPE "L1" EXCEPT
2x4 TROFFER.
* PROVIDE 5 YEAR WARRANTY
ON DEFECTIVE LEDs, BOARDS,
DRIVERS AND HOUSING.

AXIS LIGHTING:

WALED-24-3000-80-40-VL-
W-UNV-DP-1-TB(t-bar
height)
-- -- LED 4000k
3000
LUMENS
80CRI
29 120-277 * INSTALLED IN T-GRID
CEILING. HEIGHT OF T-BAR
TO BE VARIFIED.
* 0-10V 1% DIMMING.

L1 RECESSED 2x2 LED TROFFER,
4in DEEP WITH PRECISION

FORMED MICROCONICAL
STRUCTURE 92 PERCENT

TRANSMISSION CENTER LENS,
55° GLARE CUTOFF, SLIGHTLY
CONCAVE 22 GAUGE CRS

REFLECTORS, T-GRID CEILING

INSTALLATION AND WHITE
FINISH.
* PROVIDE 5 YEAR WARRANTY
ON DEFECTIVE LEDs, BOARDS,...

AXIS LIGHTING:

WALED-22-3000-80-40-VL-
W-UNV-DP-1-TB(t-bar
height)
-- -- LED 4000K
3000
LUMENS
80CRI
29 120-277 * INSTALLED IN T-GRID
CEILING. HEIGHT OF T-BAR
TO BE VARIFIED.
* 0-10V 1% DIMMING.
# CODE WATTS VOLT* TYPE DESCRIPTION MANUFACTURER

ALTERNATE

MANUFACTURERS

LAMP INPUT

COMMENTS

LIGHTING FIXTURE SCHEDULE
12" = 1'-0" E-501
1 ROOF WATERPROOF PENETRATION DETAIL
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
225A
3P
400A
3P

GENERAL NOTES

1. CONTRACTOR SHALL IDENTIFY AND FIELD -VERIFY AVAILABILITY AND SPARE

CAPACITY OF THE EXISTING ELECTRICAL DISTRIBUTION EQ UIPMENT TO BE

USED FOR TEMPORARY POWER CONNECTION OF OFFICE TRAIL ERS TO BE

PLACED ON SITE DURING CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:13 AM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

SINGLE LINE DIAGRAM - NORMAL
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 03/09/21
2014226900
E-601
# KEY NOTES
SL1 EXISTING EQUIPMENT THAT WILL BE UTILIZED FOR THIS S COPE OF WORK

NEW MECHANICAL EQUIPMENT TO BE INSTALLED
REUSE EXISTING 30A DISCONNECT FOR REMOVED HP -A1 IF IN ACCEPTABLE, SERVICEABLE CONDITION FOR NEW RTU -1. PROVIDE NEW 15A FUSES IN EXISTING DISCONNECT IF REUSED. IF EXISTING DISCONNECT IS NOT IN REUSABLE CONDITION, PROVIDE NEW DISCONNECT AS INDICATED FOR NEW RTU -1.

REPLACE EXISTING 30A BREAKER FOR REMOVED HP -A1 WITH NEW 3P -15A BREAKER WITH AIC RATING MATCHING EXISTING DISTRIBUTION BOAR D "A".

REUSE EXISTING FEEDER FOR REMOVED HP -A1 FOR CONNECTION OF NEW RTU -1 IF IN ACCEPTABLE CONDITION. OTHERWISE PROVIDE NEW 3#12 +1#12GND -3/4"C (L=80', V.D.=0.7%)
NEW 3#12+1#12GND -3/4"C (L=80', V.D.=0.7%)
PROVIDE NEW 3P -15A BREAKER FOR RTU -1 POWER EXHAUST WITH AIC RATING MATCHING EXISTING DISTRIBUTION BOARD "A".

SL5
SL2
SL2
SL2
SL3
SL3
SL4
SL4
SL5
SL6
30AS
15AF
3P
NEMA 3R
SL6 30AS
15AF
3P
NEMA 3R
SL7
SL7
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
400A
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:13 AM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

SINGLE LINE DIAGRAM - EMERGENCY
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 06/14/21
2014226900
E-602
# KEY NOTES
SL1 EXISTING EQUIPMENT THAT WILL BE UTILIZED FOR THIS S COPE OF WORK SL1
SL1
SL1 SL1 SL1
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

GENERAL NOTES

1. ALL PANELS AND

CONNECTED LOADS SHOWN
ON THIS DRAWING ARE (E) :

EXISTING TO REMAIN,

UNLESS OTHER NOTED AS
(N): NEW.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:16 AM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

PANEL SCHEDULES
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 04/26/21
2014226900
E-701
Notes:

G = GFCI S = Shunt Trip D = Switching Duty A = AFCI H = HID Rated C = HACR Rated † = Existing Circuit ‡ = Revised Circuit CB Legend (blank = circuit breaker):

Total Est. Demand: 215 A
Spare 167685 VA 100.00% 167685 VA Total Conn.: 213 A
Other 0 VA 0.00% 0 VA Total Est. Demand: 179148 VA
Motor 9561 VA 125.00% 11951 VA Total Conn. Load: 177077 VA HVAC 1194 VA 100.00% 1194 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel To tals Total Amps: 213 A 213 A 213 A
Total Load: 59.03 kVA 59.03 kVA 59.03 kVA
41 SPACE 20 A 1 -- 0 22170 -- -- -- -- 42
39 SPACE 20 A 1 -- 0 22170 -- -- -- -- 40
37 -- -- -- -- 0 22170 -- 3 100 A AC-A1 38
35 -- -- -- -- 0 15519 -- -- -- -- 36
33 MAIN DISCONNECT 400 A 3 -- 0 15519 -- -- -- -- 34
31 -- -- -- -- 8868 15519 -- 3 70 A AC-A2 32
29 -- -- -- -- 8868 3187 -- -- -- -- 30
27 AC-A3 40 A 3 -- 8868 3187 -- -- -- -- 28
25 -- -- -- -- 831 3187 3 15 A (N) RTU-1 26
23 -- -- -- -- 831 831 -- -- -- -- 24
21 HWP-A2 15 A 3 -- 831 831 -- -- -- -- 22
19 -- -- -- -- 2494 831 -- 3 15 A HWP-A1 20
17 -- -- -- -- 2494 277 -- -- -- -- 18
15 CU-A2 15 A 3 -- 2494 277 -- -- -- -- 16
13 -- -- -- -- 2494 277 -- 3 15 A TX-A2 14
11 -- -- -- -- 2494 582 -- -- -- -- 12
9 CU-A1 15 A 3 -- 2494 582 -- -- -- -- 10
7 -- -- -- -- 1829 582 -- 3 15 A TX-A1 8
5 -- -- -- -- 1829 398 -- -- -- -- 6
3 POWER EXHAUSE AC-A1 15 A 3 -- 1829 398 -- -- -- -- 4
1 SPACE -- -- -- 0 398 3 20 A (N) POWER EXHAUST RTU-1 2 CKT Circuit Description Trip Poles CB A B C CB Poles Trip Circ uit Description CKT Notes:

Serves: Lugs: Single Lugs Enclosure: Type 3
Supply From: ADH Wires: 4 MCB Rating: 400 A Mounting: Surface Location: Phases: 3 Mains Rating: 400 A AIC Rating:

Name: A Volts: 480Y/277V Mains Type: MCB Type:

Stantec Panel
Notes:

G = GFCI S = Shunt Trip D = Switching Duty A = AFCI H = HID Rated C = HACR Rated † = Existing Circuit ‡ = Revised Circuit CB Legend (blank = circuit breaker):

Total Est. Demand: 2 A
Total Conn.: 1 A
Total Est. Demand: 1356 VA
Total Conn. Load: 1085 VA
Lighting 1085 VA 125.00% 1356 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel To tals Total Amps: 0 A 0 A 4 A
Total Load: 0.00 kVA 0.00 kVA 1.09 kVA
41 SPACE -- -- -- 0 1085 1 20 A (N) ROOMS 1-5, 7 LTG 42 39 SPACE -- -- -- 0 0 -- 1 20 A NORTHEAST LTG 1ST FLOOR 40 37 SPACE -- -- -- 0 0 -- 1 20 A WEST LTG 1ST FLOOR 38
35 SPACE -- -- -- 0 0 -- 1 20 A EXTERIOR CANOPY LIGHTING 36 33 SPACE -- -- -- 0 0 -- 1 20 A LTG 2ND FLOOR 34
31 SPACE -- -- -- 0 0 -- 1 20 A LOBBY LIGHTING 32
29 SPACE -- -- -- 0 0 -- -- -- -- 30
27 SPACE -- -- -- 0 0 -- 2 20 A SITE LTG - EMPLOYEE PARKING' 2 8 25 SPACE -- -- -- 0 0 -- -- -- -- 26
23 SPACE -- -- -- 0 0 -- 2 20 A SITE LTG - EMPLOYEE PARKING 24 21 SPACE -- -- -- 0 0 -- 1 20 A MONUMENT SIGNS 22
19 SPACE -- -- -- 0 0 -- -- -- SPACE 20
17 -- -- -- -- 0 0 -- -- -- -- 18
15 -- -- -- -- 0 0 -- -- -- -- 16
13 AEL XFMR AET 70 A 3 -- 0 0 -- 3 15 A EXISITNG LOAD 14 11 -- -- -- -- 0 0 -- -- -- -- 12
9 -- -- -- -- 0 0 -- -- -- -- 10
7 EXISITNG LOAD 15 A 3 -- 0 0 -- 3 15 A EXISITNG LOAD 8 5 -- -- -- -- 0 0 -- 1 20 A SPARE (OFF) 6
3 -- -- -- -- 0 0 -- 1 20 A EMERGENCY LIGHTING 1STFLR 4 1 CU-A3 15 A 3 -- 0 0 -- 1 20 A EMERGENCY LIGHTING 2ND FLR 2 CKT Circuit Description Trip Poles CB A B C CB Poles Trip Circ uit Description CKT Notes:

Serves: Lugs: Single Lugs Enclosure: Type 1
Supply From: AEH Wires: 4 MCB Rating: 200 A Mounting: Surface Location: (EXIST) ELEC 28 Phases: 3 Mains Rating: 200 A A IC Rating: 22KAIC Name: A1H Volts: 480Y/277V Mains Type: MCB Type:

Stantec Panel Notes:

G = GFCI S = Shunt Trip D = Switching Duty A = AFCI H = HID Rated C = HACR Rated † = Existing Circuit ‡ = Revised Circuit CB Legend (blank = circuit breaker):

Total Est. Demand: 97 A
Total Conn.: 97 A
Total Est. Demand: 34947 VA
Total Conn. Load: 34947 VA
Spare 34947 VA 100.00% 34947 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel To tals Total Amps: 110 A 103 A 83 A
Total Load: 12.88 kVA 12.06 kVA 10.01 kVA
53 DO NOT USE -- -- -- 0 0 -- -- -- DO NOT USE 54
51 DO NOT USE -- -- -- 0 0 -- -- -- DO NOT USE 52
49 -- -- -- 0 0 -- -- -- DO NOT USE 50
47 -- -- -- -- 0 0 -- -- -- DO NOT USE 48
45 -- -- -- -- 0 0 -- -- -- SPACE 46
43 MAIN DISCONNECT 125 A 3 -- 0 0 -- -- -- SPACE 44
41 SPACE -- -- -- 0 0 -- -- -- SPACE 42
39 SPACE -- -- -- 0 0 -- -- -- SPACE 40
37 SPACE -- -- -- 0 0 -- -- -- SPACE 38
35 ELEVATOR PIT RECEPT 20 A 1 -- 180 0 -- -- -- SPACE 36 33 ELEVATOR PIT LIGHTING 20 A 1 -- 100 500 -- 1 20 A SECURITY P SUPPLY 34 31 EXISTING LOAD 20 A 1 -- 1920 500 -- 1 20 A SECURITY P SUPPLY 32 29 ELE. RELAY SHUNT BREAKER 20 A 1 -- 500 500 -- 1 20 A FACP 30 27 ELEVATOR LIGHT 20 A 1 -- 500 500 -- 1 20 A SECURTIY POWER SUPPLY 28 25 -- -- -- -- 6725 0 -- 1 20 A SECURTIY POWER SUPPLY 26 23 -- -- -- -- 6725 500 -- 1 20 A SECURTIY POWER SUPPLY 24 21 PANEL "MDF" 70 A 3 -- 6725 500 -- 1 20 A SECURTIY POWER SU PPLY 22 19 MDF SHUNT TRIP -- -- -- 0 1200 -- 1 20 A SECURITY EQUIPMENT 20 17 EES-1 20 A 1 -- 600 400 -- 1 20 A COM. FIRE/SMOKE DAMPER CFSD 18 15 FA BELL POWER CONNECTION 20 A 1 -- 500 1200 -- 1 20 A COM. FIRE/SMOKE DAMPER CFSD 16 13 PANEL "EPSMS" 20 A 1 -- 200 800 -- 1 20 A COM. FIRE/SMOKE DAMPER CFSD 14 11 PREACTION SYS C.P. 20 A 1 -- 500 100 -- 1 20 A DUCT SMOKE DETECTOR SD 12 9 POWR. CON FOR HVAC CNTR. PNL. 20 A 1 -- 500 100 -- 1 20 A DUCT SMOKE DETECTOR SD 10 7 POWR. CON FOR HVAC CNTR. PNL. 20 A 1 -- 500 100 -- 1 20 A DUCT SMOKE DETECTOR SD 8 5 (N) SPARE 20 A 1 -- 0 0 -- -- -- EAC-A3 SHUNT TRIP 6
3 (N) SPARE 20 A 1 -- 0 936 -- -- -- -- 4
1 (N) SPARE 20 A 1 -- 0 936 -- 2 15 A EAC-A3 2
CKT Circuit Description Trip Poles CB A B C CB Poles Trip Circ uit Description CKT Notes:

Serves: Lugs: Single Lugs Enclosure: Type 1
Supply From: AET Wires: 4 MCB Rating: 125 A Mounting: Surface Location: (EXIST) ELEC 28 Phases: 3 Mains Rating: 125 A A IC Rating: 10KAIC Name: AEL Volts: 208Y/120V Mains Type: MCB Type:

Stantec Panel
ROOF
05/24/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

GENERAL NOTES

1. ALL PANELS AND

CONNECTED LOADS SHOWN
ON THIS DRAWING ARE (E) :

EXISTING TO REMAIN,

UNLESS OTHER NOTED AS
(N): NEW.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized b y Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 9:22:16 AM
12" = 1'-0"
1 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

PANEL SCHEDULES
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
SB PE RC 2022.05.24
2014226900
E-702
Notes:

G = GFCI S = Shunt Trip D = Switching Duty A = AFCI H = HID Rated C = HACR Rated † = Existing Circuit ‡ = Revised Circuit CB Legend (blank = circuit breaker):

Total Est. Demand: 84 A
Total Conn.: 84 A
Total Est. Demand: 30350 VA
Total Conn. Load: 30350 VA
Spare 30350 VA 100.00% 30350 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel To tals Total Amps: 111 A 71 A 71 A
Total Load: 13.29 kVA 8.51 kVA 8.55 kVA
41 -- -- -- -- 220 500 -- 1 20 A IRRIGATION CONTROLLER 42 39 EAC-A4 15 A 2 -- 220 528 -- 1 15 A CIRCULATION PUMP CP-1 40 37 -- -- -- -- 1250 1440 -- 1 20 A WATER HEATHER GWH-1 38 35 CU-A4 20 A 2 -- 1250 500 -- 1 20 A VAV 1-1 THRU 1-5 36 33 SPARE 20 A 1 -- 0 552 -- 1 20 A DRINKING FOUNTAIN EWC-1 34 31 CAMERA N.W. CORNER 20 A 1 -- 1000 900 -- 1 20 A OUTDOORS RECEPT. 32 29 SPARE 20 A 1 -- 0 1200 -- 1 20 A MICROWAVE RECEPT. 30 27 PREACTION AIR COMPRESSOR 20 A 1 -- 528 1200 -- 1 20 A MICR OWAVE RECEPT. 28 25 RECEPT A115 20 A 1 -- 1440 972 -- 1 20 A GARBAGE DISPOSAL 26 23 LCD PROJECTOR 20 A 1 -- 500 1000 -- 1 20 A REFRIDGERATOR RECEPT. 24 21 SIMULATION CONSOLE 20 A 1 -- 500 1200 -- 1 20 A VENDING MA CHINE RECEPT. 22 19 E. SHADE A2 129 20 A 1 -- 250 1200 -- 1 20 A VENDING MACHINE RECEPT. 20 17 A1 113, A1 114, A1 115, A1 121, A2 106 20 A 1 -- 1080 500 -- 1 20 A FITNESS A2. 125 RECEPT. 18 15 A1 113, A1 114, A1 115, A1 121, A2 106 20 A 1 -- 1200 500 -- 1 20 A FITNESS A2. 125 RECEPT. 16 13 A1 113, A1 114, A1 115, A1 121, A2 106 20 A 1 -- 1080 500 -- 1 20 A FITNESS A2. 125 RECEPT. 14 11 A1 114, A1 123, A1 131, A1 143, A2 110 20 A 1 -- 800 500 -- 1 20 A FITNESS A2. 125 RECEPT. 12 9 A1 114, A1 123, A1 131, A1 143, A2 110 20 A 1 -- 1080 5 00 -- 1 20 A FITNESS A2. 125 RECEPT. 10 7 A1 114, A1 123, A1 131, A1 143, A2 110 20 A 1 -- 1260 5 00 -- 1 20 A FITNESS A2. 125 RECEPT. 8 5 (N) SPARE 20 A 1 -- 0 500 -- 1 20 A FITNESS A2. 125 RECEPT. 6 3 (N) SPARE 20 A 1 -- 0 500 -- 1 20 A FITNESS A2. 125 RECEPT. 4 1 E. SHADE A1 122, A1 131 20 A 1 -- 500 1000 -- 1 20 A FITNESS A2. 125 RECEPT. 2 CKT Circuit Description Trip Poles CB A B C CB Poles Trip Circ uit Description CKT Notes:

Serves: Lugs: Single Lugs Enclosure: Type 1
Supply From: ADL Wires: 4 Max Rating: 200 A Mounting: Surface Location: (EXIST) ELEC 28 Phases: 3 Mains Rating: 200 A A IC Rating: 10KAIC Name: A3L Volts: 208Y/120V Mains Type: MLO Type:

Stantec Panel
Notes:

G = GFCI S = Shunt Trip D = Switching Duty A = AFCI H = HID Rated C = HACR Rated † = Existing Circuit ‡ = Revised Circuit CB Legend (blank = circuit breaker):

Total Est. Demand: 60 A
Total Conn.: 69 A
Spare 8316 VA 100.00% 8316 VA Total Est. Demand: 21596 VA Receptacle 16560 VA 80.19% 13280 VA Total Conn. Load: 24876 VA HVAC 0 VA 0.00% 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel To tals Total Amps: 87 A 49 A 79 A
Total Load: 9.91 kVA 5.92 kVA 9.05 kVA
41 SPACE -- -- -- 0 0 -- -- -- SPACE 42
39 SPACE -- -- -- 0 0 -- -- -- SPACE 40
37 SPACE -- -- -- 0 0 -- -- -- SPACE 38
35 SPACE -- -- -- 0 0 -- -- -- SPACE 36
33 SPACE -- -- -- 0 0 -- -- -- SPACE 34
31 SPACE -- -- -- 0 0 -- -- -- SPACE 32
29 SPACE -- -- -- 0 0 -- -- -- SPACE 30
27 SPACE -- -- -- 0 0 -- -- -- SPACE 28
25 SPACE -- -- -- 0 0 -- -- -- SPACE 26
23 SPACE -- -- -- 0 0 -- -- -- SPACE 24
21 SPACE -- -- -- 0 0 -- -- -- SPACE 22
19 (N) KITCHENETTE APPLICANCE 20 A 1 1000 20
17 (N) KITCHENETTE APPLICANCE 20 A 1 1000 360 1 20 A (N) RM #3 RECEP 18 15 (N) RM #5 RECEP 20 A 1 1080 1220 1 20 A (N) RM #3 RECEP 1 6 13 (N) RM #5, 7 RECEP 20 A 1 1740 1900 1 20 A (N) RM #2 RECEP. 14 11 (N) RM #7 RECEP. 20 A 1 1640 1720 1 20 A (N) RM #4, 15 RECEP 12 9 ELECTRICAL RM RECEPT. 20 A 1 -- 540 1220 1 20 A (N) #1 REC EP 10 7 ELECTRICAL RM RECEPT. 20 A 1 -- 360 3328 -- -- -- -- 8 5 (N) SECONDARY CONSOLE 20 A 1 1000 3328 -- 2 40 A ELEC CAR CHARGER 6 3 (N) MAIN CONSOLE 20 A 1 1500 360 -- 1 20 A MULTIMEDIA 1. P NL RECEPT 4 1 (N) RM #1 SITTING CONSOLE &... 20 A 1 1180 400 -- 1 20 A FLAT PANEL MONITOR 2 CKT Circuit Description Trip Poles CB A B C CB Poles Trip Circ uit Description CKT Notes:

Serves: Lugs: Single Lugs Enclosure: Type 1
Supply From: ADL Wires: 4 Max Rating: 200 A Mounting: Surface Location: (EXIST) ELEC 28 Phases: 3 Mains Rating: 200 A A IC Rating: 10KAIC Name: A4L Volts: 208Y/120V Mains Type: MLO Type:

Stantec Panel
Notes:

G = GFCI S = Shunt Trip D = Switching Duty A = AFCI H = HID Rated C = HACR Rated † = Existing Circuit ‡ = Revised Circuit CB Legend (blank = circuit breaker):

Total Est. Demand: 154 A
Total Conn.: 154 A
Total Est. Demand: 55496 VA
Total Conn. Load: 55496 VA
Spare 55496 VA 100.00% 55496 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel To tals Total Amps: 186 A 159 A 126 A
Total Load: 21.85 kVA 18.51 kVA 15.14 kVA
41 CEILING MOUNTED PROJECTRO 20 A 1 -- 500 400 -- 1 20 A FLOOR RECEPT. MEETING RM 42 39 MULTIMEDIA INPUT PANEL EQ504 20 A 1 -- 500 0 -- 1 20 A SPA RE 40 37 AV EQUIPMENT RACK EQ500 20 A 1 -- 500 0 -- 1 20 A SPARE 38 35 MULTIMEDIA INPUT PANEL EQ505 20 A 1 -- 500 1200 -- 1 20 A MICROWAVE RECEPTACLE 36 33 CEILING MOUNTED PORJECTOR EQ11 20 A 1 -- 500 1200 -- 1 2 0 A MICROWAVE RECEPTACLE 34 31 AV EQUIPMENT RACK EQ510 20 A 1 -- 500 1000 -- 1 20 A DISHWASHER RECEPTACLE 32 29 FLOOR RECEPT. MEETING RM 20 A 1 -- 1600 360 -- 1 20 A RANGE & HOOD RECEPTACLE 30 27 FLOOR RECEPT. MEETING RM 20 A 1 -- 1600 360 -- 1 20 A OVER COUNTER RECEPTACLE 28 25 FLOOR RECEPT. MEETING RM 20 A 1 -- 1600 972 -- 1 20 A GARBAGE DISPOAL 26 23 RECEPTACLES R/R, ELEV RM 20 A 1 -- 1440 1000 -- 1 20 A REFRIGERATOR RECEPTACLE 24 21 RECEPTACLES R/R, ELEV RM 20 A 1 -- 1440 1200 -- 1 20 A VEN DING MACHING RECEPTACLE 22 19 RECEPTACLES R/R, ELEV RM 20 A 1 -- 1440 1200 -- 1 20 A VENDING MACHING RECEPTACLE 20 17 DRIVERS A2.120 RR A1.130 & A1 131 20 A 1 -- 1440 0 -- 1 20 A SPARE 18 15 DRIVERS A2.120 RR A1.130 & A1 131 20 A 1 -- 1440 1440 - - 1 20 A OUTDOOR RECEPTACLE 16 13 DRIVERS A2.120 RR A1.130 & A1 131 20 A 1 -- 1440 360 -- 1 20 A RESTROOM RECEPTACLE 14 11 (N) SPARE 20 A 1 -- 0 552 -- 1 20 A DRINKING FOUNTAIN EWC-1 12 9 OFFICE A1 102, A2 101 AND A2 103 20 A 1 -- 1600 900 -- 1 2 0 A VAV 1-6 THRU 1-14 10 7 OFFICE A1 102, A2 101 AND A2 103 20 A 1 -- 1620 4888 -- -- -- -- 8 5 A1. 122, CONF, A1 125 OFF, A2.101 20 A 1 -- 1260 4888 -- 2 50 A EAC-A2 6 3 A1. 122, CONF, A1 125 OFF, A2.101 20 A 1 -- 1440 4888 -- -- -- -- 4 1 A1. 122, CONF, A1 125 OFF, A2.101 20 A 1 -- 1440 4888 -- 2 50 A EAC-A1 2 CKT Circuit Description Trip Poles CB A B C CB Poles Trip Circ uit Description CKT Notes:

Serves: Lugs: Single Lugs Enclosure: Type 1
Supply From: ADL Wires: 4 Max Rating: 200 A Mounting: Surface Location: (EXIST) ELEC 28 Phases: 3 Mains Rating: 200 A A IC Rating: 10KAIC Name: A1L Volts: 208Y/120V Mains Type: MLO Type:

Stantec Panel
1 Owner Revisions 05/20/2022
1 1
SB PE
05/24/2022
-
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 -
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 -
-
-35
-
-
-F3
5T
-FT
-F
-35
-
-
PX-PF3
5PLAXP
X-PFSL
AX
PX-PFX
-35EAX
-F
-
-
24 -
-
-FT
24 -
30 -
24 PX-PFXT
24AX
-FT
30 -FT
24 S-LF
T1842E
AX
-
2454
T
-
2454
L182L1
F
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
I
KL1K82L1P
BSFBK
IM
-I
-IL3
0 -I
-IL2
4 S-LF34
2-AAX
SR-LF54
2-AAX
SR
-LF542-A
AX
MSRM
-ICPM2715
24BBFL
MAX
TB-XA
2454
AX
TB-AL
EAX
T-
32LF
-
-1
T
-1
PX-EPF2
AX
-
-
-30
-24
-30
-24
PX-EPS2
4AX
NL215N427
2 GLK
NOF
L1834
LF
L1834
LF
-
-3524
-
-
-
-
-F
-3524F
-
-3530
-
-3524
PX-PFX
-3524FPA
X
-F
-3530F
-F
-3524F

MSUM-DXLO
H1460DMAX

MSUM-DXLS
LF230MAX

MSUM-DXLE
P30MAX
M
T
M-UR
2460
MAX

MTBM-MXHA
3084S
MAX
L215427
2 L

2 ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
0 1' 2'
EL.

CL

WORK DEFINITION

EXISTING

REMOVE EXISTING

NEW WORK
FUTURE

TEMPORARY, AS NOTED

REMOVE EXISTING ELECTRICAL EQUIPMENT
???
KEY NOTE ?:##

EQUIPMENT IDENTIFICATION

TELECOM OUTLETS

OUTLET, SURFACE MOUNTED FLOOR BOX

TELECOM OUTLET TYPES
# INDICATES QUANTITY OF DATA JACKS, PULLSTRING
ALWAYS PROVIDED. REFER TO CABLING SCHEDULE
FOR MORE INFORMATION.
#
OUTLET

TELECOM OUTLET TYPES
# INDICATES QUANTITY OF DATA JACKS, PULLSTRING
ALWAYS PROVIDED. REFER TO CABLING SCHEDULE
FOR MORE INFORMATION.
#

OUTLET, CEILING MOUNTED
TELECOM MISC.

CABLE TRAY

CABLE TRAY WITH FLANGE SIDE RAILS AND LADDER
RUNGS

BUNDLED CABLE SUPPORT, J-HOOK SYSTEM

BUNDLED CABLE SUPPORT, J-HOOK SYSTEM, CEILING

MOUNTED

BUNDLED CABLE SUPPORT, J-HOOK SYSTEM,

PENDANT MOUNTED

GROUND BAR, LENGTH TO SCALE

RAISED FLOOR GROMMET

WAP WIRELESS ACCESS POINT

WAP WIRELESS ACCESS POINT, CEILING MOUNTED

RACEWAYS
RACEWAY CONCEALED IN CEILING OR WALL.

EXPOSED RACEWAY IS ALLOWED ONLY
WHERE NOTED.

RACEWAY BELOW SLAB OR UNDERGROUND

RACEWAY UP

RACEWAY DOWN

RACEWAY STUB-OUT WITH BUSHING

RACEWAY CONTINUATION

JUNCTION BOX, CEILING OR ABOVE CEILING

MOUNTED

PULL BOX

JUNCTION BOX, WALL MOUNTED
J
PB
J

JUNCTION BOX, IN-GROUND J

SURFACE RACEWAY
(HORIZONTAL/VERTICAL)

AUDIO VISUAL

AV CONNECTION, WALL MOUNTED

RF OUTLET, WALL MOUNTED
?
? ?

DETAIL NUMBER

SHEET ON WHICH

DETAIL IS SHOWN
?
?

DETAIL CALLOUTS

EXTERIOR ELEVATIONS

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS SHOWN
?
? ?
? ?
? ?
? ?

INTERIOR ELEVATIONS

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS SHOWN
?
??
__________________________

BUILDING SECTIONS

SECTION NUMBER

SHEET ON WHICH

SECTION IS SHOWN
?
??
__________________________
?
??
__________________________

WALL SECTIONS

SECTION NUMBER

SHEET ON WHICH

SECTION IS SHOWN
FLOOR
0'-0"

FLOOR OR ROOF LEVEL NAME

VERTICAL ELEVATION

NORTH ARROW
? DRAWING REVISION
?
? ?
N

MATCH LINE

ELEVATION
TOP OF
SLOPE
10000
0000
0000
M01
X

GRAPHIC SCALES - ENGINEERING

ELEVATION

ELEVATION - CEILING

DATUM ELEVATION

ROOM TAG

KEY NOTE TAG

SLOPE ARROW

CENTER LINE

GRID BUBBLE AND LINE

GENERAL SYMBOLS

POINT OF CONNECTION OF NEW TO EXISTING
SYSTEM

DEMOLITION

EXISTING

POINT OF DISCONNECTION OF DEMOLITION FROM

EXISTING

NEW WORK

CAP OFF EXISTING
CTE
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:53:43 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

SYMBOL AND ABBREVIATIONS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/28/16
2014226900
T-000

ABBREVIATIONS

TELECOM TELECOMMUNICATIONS

TGB TELECOMMUNICATIONS

GROUNDING BUSBAR

TMGB TELECOMMUNICATIONS MAIN

GROUNDING BUSBAR

TP TAMPER RESISTANT

TR TELECOMMUNICATIONS ROOM

TTB TELECOM TERMINAL BOARD

TV TELEVISION

TX TRANSMIT

TYP TYPICAL

UBC UNIT BONDING CONDUCTOR

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

USB UNIVERSAL SERIAL BUS

UTP UNSHIELDED TWISTED PAIR

V VOICE

VC VOLUME CONTROL

VDT VISUAL DISPLAY TERMINAL

VEL VERIFY EXACT LOCATION

VERT VERTICAL

VIF VERIFY IN FIELD

VOL VOLUME

VP VIDEO PROJECTOR

VPP VOICE PATCH PANEL

VSS VIDEO SURVEILLANCE SYSTEM

W WALL TELEPHONE

WAP WIRELESS ACCESS POINT

WP WEATHERPROOF

WT WATERTIGHT

ABBREVIATIONS

HM HORIZONTALLY MOUNTED

HOR HORIZONTAL

HT HEIGHT

ID INSIDE DIAMETER

IDF INTERMEDIATE DISTRIBUTION
FRAME

IDP INTRUSION DETECTION PANEL

IR INFRARED

ISP INSIDE PLANT

JB JUNCTION BOX

LED LIGHT EMITTING DIODE

LR LEGALLY REQUIRED

LTG LIGHTING

LV LOW VOLTAGE

MAG MAGNETIC

MAX MAXIMUM

MDF MAIN DISTRIBUTION FRAME

MECH MECHANICAL
mesh-BN MESH BONDING NETWORK
mesh-IBN MESH ISOLATED BONDING

NETWORK

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MM MULTIMODE FIBER (FIBRE) OPTIC
STRAND

MPOE MAIN POINT OF ENTRY

MTD MOUNTED

MTG MOUNTING

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED, CONTRACTOR

INSTALLED

OFE OWNER FURNISHED EQUIPMENT

OFOI OWNER FURNISHED, OWNER

INSTALLED

OH OVERHEAD

OPER OPERABLE/OPERATOR

OSP OUTSIDE PLANT
P POLE

PA PUBLIC ADDRESS

PB PULL BOX

PBB PRIMARY BONDING BUSBAR

PDU POWER DISTRIBUTION UNIT

POE POINT OF ENTRANCE

POS POINT OF SERVICE

PP PATCH PANEL

PR PAIR

PTS PNEUMATIC TUBE STATION

PTZ PAN/TILT/ZOOM

PVC POLYVINYL CHLORIDE

PWR POWER

R RACEWAY

RBB RACK BONDING BUSBAR

RBC RACK BONDING CONDUCTOR

REC RECESSED

REQD REQUIRED

REX REQUEST TO EXIT

RF RADIO FREQUENCY

RM ROOM

RMU RACK MOUNTED UNIT

RO RACEWAY ONLY

RX RECEIVE

SBB SECONDARY BONDING BUSBAR

SBG SUPPLEMENTARY BONDING GRID

SCTP SCREENED TWISTED PAIR

SEC SECURITY

SECT SECTION

SIM SIMILAR

SLV SLEEVE

SM SINGLE MODE FIBER OPTIC STRAND

SMR SURFACE MOUNTED RACEWAY

SPECS SPECIFICATIONS

SPFPP SERVICE PROVIDER FIBER PATCH
PANEL

SPT SPLITTER

STD STANDARD

STP SHIELDED TWISTED PAIR

TBB TELECOMMUNICATIONS BONDING

BACKBONE

TBC TELECOMMUNICATIONS BONDING

CONDUCTOR

TC TELECOMMUNICATIONS

CONTRACTOR

TE TELECOMMUNICATIONS

ENCLOSURE

TEBC TELECOMMUNICATIONS

EQUIPMENT BONDING CONDUCTOR

TELE TELEPHONE

ABBREVIATIONS
(D) DEMOLISH
(E) EXISTING
(F) FUTURE
(N) NEW
(R) EXISTING TO BE RELOCATED

ABV ABOVE

AC ACCESS CONTROL

ACH ABOVE COUNTER HEIGHT

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJUSTABLE

AFC ABOVE FINISHED CEILING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

ALD ASSISTED LISTENING DEVICE

ALT ALTERNATE

ANT ANTENNA

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AV AUDIO VISUAL

AVG AVERAGE

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BBC BACKBONE BONDING CONDUCTOR

BBU BATTERY BACKUP UNIT

BCT BONDING CONDUCTOR FOR

TELECOMMUNICATIONS

BDA BI-DIRECTIONAL AMPLIFIER

BFC BELOW FINISHED CEILING

BFG BELOW FINISHED GRADE

BLDG BUILDING

BTM BOTTOM

C CONDUIT

C/W COMPLETE WITH

CAP CAPACITY

CATV COMMUNITY ANTENNA TELEVISION

CBN COMMON BONDING NETWORK

CCTV CLOSED CIRCUIT TELEVISION

CFOI CONTRACTOR FURNISHED, OWNER

INSTALLED

CL CENTERLINE

CLG CEILING

CM CEILING MOUNTED

CMP COMMUNICATIONS MEDIA PLENUM

CMR COMMUNICATIONS MEDIA RISER

CMU CONCRETE MASONRY UNIT

CO CONDUIT ONLY

COMM COMMUNICATIONS

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

CTR CENTER

CU COPPER
D DATA

DAS DISTRIBUTED ANTENNA SYSTEM

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DIV DIVISION

DL DAMP LOCATION

DN DOWN

DWG DRAWING

EA EACH

EC ELECTRICAL CONTRACTOR

EF ENTRANCE FACILITY

ELEC ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EQUIP EQUIPMENT

ER EQUIPMENT ROOM/EMERGENCY
ROOM

ERRCS EMERGENCY RESPONDER RADIO

COMMUNICATIONS SYSTEM

EXTER EXTERIOR

F&I FURNISHED AND INSTALLED

FA FIRE ALARM

FB FLOOR BOX

FDU FIBER (FIBRE) OPTIC DISTRIBUTION
UNIT

FLR FLOOR

FO FIBER (FIBRE) OPTIC(AL)

FTP FOIL TWISTED PAIR

G, GND GROUND

GC GENERAL CONTRACTOR

GE GROUNDING EQUALIZER

HH HANDHOLE

HK HOUSE KEEPING PAD

DRAWING INDEX
NO. DRAWING NAME
T-000 SYMBOL AND ABBREVIATIONS
T-001 TELECOM SPECIFICATION
T-002 TELECOM SPECIFICATION
T-003 TELECOM SPECIFICATION
T-004 TELECOM CABLING ROUGH-IN SCHEDULES
TD-101 TELECOM DEMOLITION PLAN
T-101 TELECOM GROUND FLOOR PLAN
T-401 TELECOM ENLARGED PLAN
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-601 TELECOM SINGLE LINE DIAGRAM

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:53:47 PM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM SPECIFICATION
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/28/21
2014226900
T-001
SECTION 27 05 00

COMMON WORK RESULTS FOR COMMUNICATIONS
PART 1 - GENERAL

1.1 CODES, PERMITS, INSPECTION FEES
A. THE FOLLOWING CODES AND STANDARDS ARE REFERENCED IN THE DIVIS ION 27 SPECIFICATIONS.

PERFORM ALL WORK AND PROVIDE MATERIALS AND EQUIPMEN T IN ACCORDA NCE WITH THE LATEST REFERENCED CODES AND STANDARDS OF THE FOLLOWING ORG ANIZATIONS:

1. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

2. NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEM A)

3. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

4. UNDERWRITER'S LABORATORIES (UL)

5. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

6. BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL (BICSI)

7. INTERNATIONAL BUILDING CODE (IBC)

8. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

9. INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (I EEE)

10. FEDERAL COMMUNICATIONS COMMISSION RULES AND REGULAT IONS (FCC )

11. NATIONAL ELECTRICAL CODE (NFPA ARTICLE 70) (NEC)

12. NATIONAL ELECTRICAL SAFETY CODE (NESC)

13. CALIFORNIA ELECTRICAL CODE (CEC, TITLE 24, PART 3)

14. CALIFORNIA BUILDING CODE (CBC, TITLE 24, ALL PARTS)

15. CALIFORNIA ENERGY CODE (TITLE 24, PART 6)

16. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA )

17. RURAL UTILITIES SERVICE (RUS)

18. TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

19. ELECTRONICS INDUSTRY ALLIANCE (EIA)

20. UNIFORM BUILDING CODE (UBC)

21. UL 2043 & UL 2239

22. NEMA VE1 & VE2
B. INSTALL THE COMMUNICATIONS SYSTEMS BASED ON THE FOL LOWING:

NFPA 70 NATIONAL ELECTRICAL CODE AS ADOPTED AND AMENDED BY THE L OCAL JURISDICTION.

CEC TITLE 24 CALIFORNIA ELECTRICAL CODE AS ADOPTED AND AMENDE D BY THE LOCAL JURISDICTION.

IBC INTERNATIONAL BUILDING CODE AS ADOPTED AND AMENDED BY THE LOCAL JURISDICTION.

C. COMMUNICATIONS SPECIFIC:

1. ANSI/TIA -568.0 -D: GENERIC TELECOMMUNICATIONS CABLING FOR CUS TOMER PREMISES.

2. ANSI/TIA -568.1 -D: COMMERCIAL BUILDING TELECOMMUNICATIONS INF RASTRUCTURE STANDARD

3. ANSI/TIA -568 -2.D: BALANCED TWISTED PAIR TELECOMMUNICATIONS CA BLING AND COMPONENTS

STANDARDS

4. ANSI/TIA -569 -D: TELECOMMUNICATIONS PATHWAYS AND SPACES

5. ANSI/TIA -606 -C: ADMINISTRATION STANDARD FOR TELECOMMUNICATION S INFRASTRUCTURE

6. ANSI/TIA -607 -C: GENERIC TELECOMMUNICATIONS BONDING AND GROUND ING (EARTHING) FOR

CUSTOMER PREMISES

7. BICSI: TELECOMMUNICATIONS DISTRIBUTION METHODS MANU AL, LATEST EDITION

8. BICSI: TELECOMMUNICATIONS CABLING INSTALLATION MANU AL, LATEST EDITION

9. NEC: NFPA 70
D. THE REFERENCED CODES AND STANDARDS ESTABLISH A MINI MUM LEVEL OF REQUIREMENTS. WHERE

PROVISION OF THE VARIOUS CODES CONFLICT WITH EACH O THER, THE MO RE STRINGENT PROVISION SHALL GOVERN. IF ANY CONFLICT OCCURS BETWEEN REFER ENCED CODES AND THIS SPECIFICATION, THE CODES ARE TO GOVERN. COMPLIANCE WITH CODE REQU IREMENTS SHA LL NOT BE CONSTRUED AS

RELIEVING THE CONTRACTOR FROM COMPLYING WITH ANY RE QUIREMENTS O F THE DRAWINGS OR

SPECIFICATIONS WHICH MAY BE IN EXCESS OF REQUIREMEN TS OF THE GO VERNING CODES AND RULES AND NOT CONTRARY TO SAME.

E. OBTAIN AND PAY FOR ALL LICENSES, PERMITS AND INSPEC TIONS REQU IRED BY LAWS, ORDINANCES AND RULES GOVERNING WORK SPECIFIED HEREIN. ARRANGE FOR INSPECTION OF WORK BY THE INSPECTORS AND GIVE THE INSPECTORS ALL NECESSARY ASSISTANCE IN THEIR WORK OF INSPECTION.

1.2 COORDINATION
A. COORDINATE WORK WITH THAT OF THE OTHER CONTRACTORS AND/OR OTH ER TRADES DOING WORK ON THE PROJECT. EXAMINE ALL DRAWINGS AND SPECIFICATIONS OF OTHER TRADES FOR CONSTRUCTION DETAILS AND COORDINATION. MAKE EVERY REASONABLE EF FORT TO PROV IDE TIMELY NOTICE OF WORK

AFFECTING OTHER TRADES TO PREVENT CONFLICTS OR INTE RFERENCE AS TO SPACE REQUIREMENTS,

DIMENSIONS, OPENINGS, BLOCK -OUTS, SLEEVING OR OTHER MATTERS WHI CH WILL CAUSE DELAYS OR NECESSITATE WORK -AROUND METHODS.

B. OBTAIN SUBMITTALS AND SHOP DRAWINGS OF ALL EQUIPMEN T WITH COM MUNICATIONS CONNECTIONS FURNISHED UNDER OTHER DIVISIONS OF THE SPECIFICATION AND BY TH E STATE. PROVIDE ALL WIRING IN ACCORDANCE WITH SPECIFIC EQUIPMENT REQUIREMENTS. I MMEDIATELY A DVISE THE STATE OF ANY CHANGES WHICH MAY AFFECT THE CONTRACT PRICE.

C. SPECIAL ATTENTION IS CALLED TO THE FOLLOWING ITEMS. COORDINA TE ALL CONFLICTS PRIOR TO INSTALLATION:

1. LOCATION OF GRILLES, PIPES, SPRINKLER HEADS, DUCTS AND OTHER MECHANICAL EQUIPMENT SO

THAT ALL COMMUNICATIONS OUTLETS AND EQUIPMENT ARE C LEAR FROM AN D IN PROPER RELATION TO THESE ITEMS.

2. LOCATION OF CABINETS, COUNTERS AND DOORS SO THAT CO MMUNICATIO NS OUTLETS, AND EQUIPMENT ARE CLEAR FROM AND IN PROPER RELATION TO THESE ITEMS.

G. SUBMITTALS AND SHOP DRAWINGS ARE REQUIRED PER THE S UBMITTALS SCHEDULE AT THE END OF THIS SECTION.

1.5 PROJECT CLOSE -OUT
A. REQUEST FOR FINAL PUNCHLIST

1. TO REQUEST A FINAL LOW VOLTAGE PUNCH LIST, FORWARD A LETTER T O THE STATE, STATING; "THE

COMMUNICATIONS WORK ON THIS PROJECT IS COMPLETE, AL L PUNCH LIST ITEMS TO DATE ARE COMPLETE, ITEMS A. - G. IN THE PUNCHLIST PROCURE PARAGRAPH IN S ECTION 27 05 00 - COMMON

WORK RESULTS FOR COMMUNICATIONS ARE COMPLETE AND TH E PROJECT IS READY FOR FINAL PUNCH LIST OBSERVATION."

2. PROJECT PUNCHLIST PROCEDURE: PERFORM THE FOLLOWING PROCEDURES FOR PROJECT CLOSEOUT OF COMMUNICATIONS PORTIONS OF WORK.

A. PROVIDE WRITTEN WARRANTY IN O & M PER THE GENERAL C ONDITIONS OF THE CONTRACT.

B. FURNISH RECORD DRAWINGS PER THIS SECTION. OBTAIN S IGNATURE O N JOB COMPLETION FORM.

C. FURNISH O & M MANUALS PER THIS SECTION. OBTAIN SIG NATURE ON JOB COMPLETION FORM.

D. GIVE INSTRUCTION PERIODS TO STATE'S PERSONNEL PER T HIS SECTIO N. OBTAIN SIGNATURE ON JOB COMPLETION FORM.

E. TO REQUEST FINAL ACCEPTANCE OF PROJECT, FILL OUT JO B COMPLETI ON FORM IN THIS SECTION AND FORWARD TO STANTEC. NOTE: IF INSPECTORS HAVE N OT SIGNED FO RM, A COPY OF SIGNED - OFF PERMITS WILL SUFFICE.

F. INCLUDE WITH JOB COMPLETION FORM, A COPY OF THE FIN AL PUNCH L IST WITH THE WORD "DONE", AND THE DATE AND CONTRACTOR'S INITIALS AFTER EACH I TEM ON THE L IST.

1.6 COMMUNICATIONS EQUIPMENT OPERATION AND MAINTENANCE (O&M) MAN UALS A. THE INFORMATION INCLUDED MUST BE THE EXACT EQUIPMEN T INSTALLE D. WHERE SHEETS SHOW THE

EQUIPMENT INSTALLED AND OTHER EQUIPMENT, THE INSTAL LED EQUIPMEN T SHALL BE NEATLY AND CLEARLY IDENTIFIED ON SUCH SHEETS.

B. THESE O&M MANUALS SHALL CONTAIN ALL THE INFORMATION NEEDED TO OPERATE AND MAINTAIN ALL SYSTEMS AND EQUIPMENT PROVIDED IN THE PROJECT. PRE SENT AND ARR ANGE INFORMATION IN A LOGICAL MANNER FOR EFFICIENT USE BY THE STATE'S OPE RATING PERSO NNEL. THE INFORMATION PROVIDED SHALL INCLUDE BUT NOT BE LIMITED TO THE FO LLOWING:

1. EQUIPMENT MANUFACTURER, MAKE, MODEL NUMBER, SIZE, N AMEPLATE D ATA, ETC.

2. DESCRIPTION OF SYSTEM CONFIGURATION AND OPERATION I NCLUDING C OMPONENT IDENTIFICATION AND INTERRELATIONS. A MASTER CONTROL SCHEMATIC DRA WINGS(S) MAY BE REQUIRED FOR THIS PURPOSE.

3. DIMENSIONAL AND PERFORMANCE DATA FOR SPECIFIC UNIT PROVIDED A S APPROPRIATE.

4. MANUFACTURER'S RECOMMENDED OPERATION INSTRUCTIONS.

5. COMPLETE PARTS LIST INCLUDING REORDERING INFORMATIO N, RECOMME NDED SPARES AND ANTICIPATED USEFUL LIFE (IF APPROPRIATE). PARTS LI STS SHALL GI VE FULL ORDERING INFORMATION ASSIGNED BY THE ORIGINAL PARTS MANUFACTURER. RELAB ELED AND/OR RENUMBERED PARTS INFORMATION AS REASSIGNED BY EQUIPMENT SUPPLIER NOT ACCEPTABLE.

6. SHOP DRAWINGS.

7. WIRING DIAGRAMS.

8. SIGNAL EQUIPMENT SUBMITTALS SHALL CONTAIN STEP -BY -STEP CIRCUI T DESCRIPTION INFORMATION

DESIGNED TO ACQUAINT MAINTENANCE PERSONNEL WITH EQU IPMENT OPERA TION IN EACH MODE OF OPERATION.

9. A COMPLETE LIST OF LOCAL (NEAREST) MANUFACTURER REP RESENTATIV E AND DISTRIBUTOR CONTACTS FOR EACH TYPE OF EQUIPMENT AND MANUFACTURE R. INCLUDE NAME, COMPANY, ADDRESS, PHONE, FAX, E -MAIL ADDRESS, AND WEB SITE.

10. CABLE TEST REPORTS.

C. FURNISH COMPLETE WIRING DIAGRAMS FOR EACH SYSTEM FO R THE SPEC IFIC SYSTEM INSTALLED UNDER THE CONTRACT. "TYPICAL" LINE DIAGRAMS WILL NOT BE ACCEPTABLE U NLESS REVISED TO INDICATE THE EXACT FIELD INSTALLATION.

D. GROUP THE INFORMATION CONTAINED IN THE MANUALS IN A N ORDERLY ARRANGEMENT BY SPECIFICATION INDEX. PROVIDE A TYPEWRITTEN INDEX AND DIVIDER SHEE TS BETWEEN C ATEGORIES WITH IDENTIFYING TABS. BIND THE COMPLETED MANUALS WITH HARD BOARD C OVERS NOT EX CEEDING 5" THICK. (PROVIDE TWO OR MORE VOLUMES IF REQUIRED.) SIGNAL AND COMMU NICATION SYS TEMS SHALL BE IN SEPARATE VOLUMES. IMPRINT THE COVERS WITH THE NAME OF THE J OB, STATE, E NGINEER, CONTRACTOR AND YEAR OF COMPLETION. IMPRINT THE BACK EDGE WITH THE NAME OF THE JOB, STATE AND YEAR OF COMPLETION. HARD BOARD COVERS AND LITERATURE CONTA INED MAY BE HELD TOGETHER WITH SCREW POST BINDING.

1.7 ABBREVIATIONS AND DEFINITIONS
A. WHEN THE FOLLOWING ABBREVIATIONS AND DEFINITIONS AR E USED IN RELATION TO THE WORK FOR DIVISION 27 THEY SHALL HAVE THE FOLLOWING MEANINGS:

ITEM MEANING
AHJ: AUTHORITY HAVING JURISDICTION.

BICSI: BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL BOXES: OUTLET, JUNCTION OR PULL BOXES.

CODE: ALL APPLICABLE CODES CURRENTLY ENFORCED AT PROJECT LOCATION.

COMPRESSION: COMPRESSED USING A LEVERAGE POWERED (HYDRAULIC OR E QUIVALENT) CR IMPING TOOL.

CONNECTION: ALL MATERIALS AND LABOR REQUIRED FOR EQUIPMENT TO B E FULLY OPER ATIONAL.

EXTERIOR LOCATION: OUTSIDE OF OR PENETRATING THE OUTER SURFACES OF THE BUILDING WE ATHER PROTECTIVE MEMBRANE.

FULLY OPERATIONAL: TESTED, APPROVED, AND OPERATING TO THE SATISFACTION OF THE AHJ, MANUFACTURER AND CONTRACT DOCUMENTS.

INSTALL: TO ENTER OR ATTACH PERMANENTLY INTO THE PROJECT AND MAKE FULLY OPERATIONAL.

MFR.: MANUFACTURER.

3. RECESSING AND CONCEALING COMMUNICATIONS MATERIALS I N CMU WALL S, CONCRETE CONSTRUCTION AND PRECAST CONSTRUCTION.

4. IN EVERY TELECOMMUNICATION ROOM WITH EITHER ACTIVE OR PASSIVE EQUIPMENT THE

CONTRACTOR SHALL MONITOR THE WORK OF ALL TRADES TO ASSURE THAT THE SPACE AND CLEARANCE REQUIREMENTS OF CODE ARE MET.

5. REVIEW SPECIFICATIONS FOR OTHER DIVISIONS OF THE WO RK TO DETE RMINE WHERE OTHER DIVISIONS ARE REQUIRING COMMUNICATION CONNECTIONS. VERIFY PROV ISIONS SHOWN ON

CONTRACT DRAWINGS BY EXAMINING SHOP DRAWING SUBMITT ALS OF OTHER DIVISIONS PRIOR TO SUBMISSION TO THE STATE. DO NOT PROCEED WITH ORDER ING OF SUPPO RTING EQUIPMENT, UNTIL CHARACTERISTICS ARE VERIFIED. PROCEED WITH ROUGH -IN ONLY AFTER VERIFICATION OF SHOP DRAWINGS.

D. FURNISH, INSTALL AND PLACE IN SATISFACTORY CONDITIO N ALL RACE WAYS, BOXES, CONDUCTORS AND

CONNECTIONS AND ALL OTHER MATERIALS REQUIRED FOR THE COMMUNICA TION SYSTEMS SHOWN OR

NOTED IN THE CONTRACT DOCUMENTS TO BE COMPLETE, FUL LY OPERATION AL AND FULLY TESTED UPON COMPLETION OF THE PROJECT. RACEWAYS, BOXES AN D GROUND CON NECTIONS ARE SHOWN DIAGRAMMATICALLY ONLY AND INDICATE THE GENERAL CHARACTER AND A PPROXIMATE LOCATION.

WHERE ROUTINGS OF MAJOR RACEWAYS AND TELECOMMUNICAT ION PATHWAYS ARE INDICATED ON PLAN SHEETS, THE ROUTING INFORMATION SUPPLEMENTS TH E INFORMATIO N ON DIAGRAMS. IF NO

ROUTING INFORMATION IS SHOWN, ROUTE THE SYSTEMS IN A MANNER TH AT WILL COORDINATE WITH NEW AND EXISTING INFRASTRUCTURE AND THE WORK OF OTHER T RADES.

E. CONSULT THE DRAWINGS FOR THE EXACT HEIGHT AND LOCAT ION OF ALL COMMUNICATION EQUIPMENT NOT SPECIFIED HEREIN OR SHOWN ON THE DRAWINGS. MAK E ANY MINOR CHANGES (LESS THAN 6' -6" HORIZONTAL) IN THE LOCATION OF THE RACEWAYS, OUTLET S, BOXES, DE VICES, WIRING, ETC., FROM

THOSE SHOWN ON THE DRAWINGS WITHOUT EXTRA CHARGE, W HERE COORDIN ATION REQUIRES OR IF SO DIRECTED BY THE STATE BEFORE ROUGH -IN.

F. PROVIDE INSERTS OR SLEEVES FOR OUTLET BOXES, CONDUC TORS, CABL ES AND/OR RACEWAYS AS REQUIRED. COORDINATE THE INSTALLATION THEREOF WITH OTHER TRADE S.

G. THE CONTRACTOR WILL NOT BE PAID FOR RELOCATION OF W ORK, CUTTI NGS, PATCHING AND FINISHING

REQUIRED FOR WORK REQUIRING REINSTALLATION DUE TO LACK OF COOR DINATION PRIOR TO INSTALLATION.

1.3 WARRANTY
A. REFER TO GENERAL CONDITIONS OF THE CONTRACT.

1.4 SUBMITTALS AND SHOP DRAWINGS
A. SUBMITTALS AND SHOP DRAWINGS: PREPARED UNDER THE D IRECT SUPE RVISION OF A BICSI RCDD.

SUBMIT ELECTRONICALLY IN PORTABLE DOCUMENT FORMAT (PDF). SCHED ULE SO AS NOT TO DELAY CONSTRUCTION SCHEDULE AND NO LATER THAN 60 DAYS AFT ER AWARD OF CONTRACT SUBMIT COMMON

BROCHURE(S) WITH INDEX AND DIVIDER TABS BY SPECIFIC ATION SECTIO N, CONTAINING ALL REQUIRED CATALOG CUTS. ALLOW TWO WEEKS FOR REVIEW FOR EACH SUBMITTA L A ND RESUBMITTAL. INCOMPLETE

SUBMITTALS AND SHOP DRAWINGS WHICH DO NOT COMPLY WITH THESE RE QUIREMENTS WILL BE RETURNED FOR CORRECTION, REVISION AND RESUBMITTAL.

B. PRODUCT SUBMITTALS:

1. INDICATE LISTING BY UL OR OTHER APPROVED TESTING AG ENCY.

2. HIGHLIGHT ELECTRONICALLY WITH YELLOW, BLUE, OR RED ADEQUATE I NFORMATION TO DEMONSTRATE MATERIALS BEING SUBMITTED FULLY COMPLY WITH CONTRAC T DOCUMENTS.

3. REVIEW AND CHECK ALL MATERIAL PRIOR TO SUBMITTAL AN D STAMP "R EVIEWED AND APPROVED".

4. PROVIDE MANUFACTURER AND/OR LAB CERTIFICATION THAT ALL PRODUC T MATERIALS ARE PCB -FREE.

C. CONTRACTOR QUALIFICATION DATA: PROVIDE MOST RECENT VALID CER TIFICATION DOCUMENTATION FOR

INSTALLATION TECHNICIAN, INSTALLATION SUPERVISOR, A ND FIELD INS PECTOR AND YEARS OF EXPERIENCE. THESE INCLUDE BICSI ITS INSTALLATION C ERTIFICATION S AND ALL RELEVANT SPECIFIC MANUFACTURE PRODUCT INSTALLATION CERTIFICATIONS.

D. CONTRACTOR QUALIFICATION DATA: PROVIDE MOST RECENT VALID CERT IFICATION DOCUMENTATION FOR COMMSCOPE CERTIFIED BUSINESS PARTNER.

E. SHOP DRAWINGS SHALL SHOW:

1. RATINGS OF ITEMS AND SYSTEMS.

2. HOW THE COMPONENTS OF AN ITEM OR SYSTEM ARE ASSEMBL ED, INTERC ONNECTED, FUNCTION TOGETHER AND HOW THEY WILL BE INSTALLED ON THE PROJ ECT.

3. SYSTEM LAYOUT FLOOR PLANS WITH COMPLETE DEVICE LAYO UT WITH DE VICE LABELS ON PLANS,

POINT -TO -POINT WIRING CONNECTION BETWEEN ALL COMPONENTS OF T HE SYSTEM, WIRE SIZES AND COLOR CODING.

4. COORDINATE WITH OTHER DIVISION SHOP DRAWINGS AND SU BMITTALS. IDENTIFY INTERFACE POINTS AND INDICATE METHOD OF CONNECTION.

5. COMMUNICATIONS ROOMS: SUBMIT 1/2" = 1' -0" DETAIL PLANS AND W ALL ELEVATIONS OF EACH ROOM SHOWING ACTUAL SIZE OF EQUIPMENT IN PLACE. IDENTIFY COORDINAT ING ELEMENTS SUCH AS STRUCTURAL BEAMS OR MECHANICAL SYSTEMS. SUBMITTALS SHALL SHOW COORDINATION AMONG

ALL SUPPLIERS OF EQUIPMENT, INCLUDING POWER COMPONE NTS, FIRE AL ARM, RACKS, NURSE CALL, PUBLIC ADDRESS, SECURITY, ETC. SUBMIT ROOM LAYOUTS AT SAME TIM E AS MATERIAL SUBMITTALS, AND PRIOR TO INSTALLATION OF ANY EQUIPMENT.

F. THE ENGINEER'S REVIEW IS ONLY FOR GENERAL CONFORMAN CE WITH TH E DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN T HE CONTRACT DOCUMENTS.

CORRECTIONS OR COMMENTS MADE DURING THIS REVIEW DO NOT RELIEVE CONTRACTOR FROM COMPLIANCE WITH THE REQUIREMENTS OF THE DRAWINGS AN D SPECIFICAT IONS. CONTRACTOR IS RESPONSIBLE FOR: DIMENSIONS WHICH SHALL BE CONFIRM ED AND CORRE LATED AT THE JOB SITE; FABRICATION PROCESS AND TECHNIQUES OF CONSTRUCTION; COORDINATIO N OF THIS WORK WITH THAT OF ALL OTHER TRADES; PERFORMING THIS WORK IN A SAFE AND SA TISFACTORY MANNER.

NEC: NATIONAL ELECTRICAL CODE, NATIONAL FIRE PROTECTION ASSOCIATION, PUBLICATION #70.

NOTED: SHOWN OR SPECIFIED IN THE CONTRACT DOCUMENTS.

PROVIDE: FURNISH AND INSTALL.

REQUIRED: AS REQUIRED BY CODE, AHJ, CONTRACT DOCUMENTS, OR MA NUFACTURER FO R THE PARTICULAR INSTALLATION TO BE FULLY OPERATIONAL.

SHOWN: AS INDICATED ON THE DRAWINGS OR DETAILS.

WIRING: RACEWAY, CONDUCTORS AND CONNECTIONS.

ACCEPTED/ACCEPTABLE: WORK OR MATERIALS CONFORMING WITH THE INTENT OF THE

PROJECT, AND IN GENERAL, CONFORMING TO THE PERTINEN T INFORMATION IN THE CONSTRUCTION DOCUMENTS.

APPROVED/APPROVAL: THE WRITTEN APPROVAL OF THE ENGINEER.

ACCESSIBLE/EASY ACCESS: ACCESS ATTAINED WITHOUT REQUIRING EXTENSIVE REMOVAL OF OTHER MATERIALS TO GAIN ACCESS.

ACCESSIBLE CEILING: ACOUSTICAL TILE HANGING CEILINGS ( “HARD -LID ” CEILINGS [CONCEALED SPINE OR SHEETROCK/GYPSUM CEILINGS], EVEN WHEN PROV IDED WITH ACC ESS PANELS, ARE NOT CONSIDERED AN ACCESSIBLE CEILING.)
AGREEMENT: THE CONTRACTUAL AGREEMENT BETWEEN THE STATE AND THE CONTRACTOR.

COMMUNICATIONS INFRASTRUCTURE SYSTEM: A COMMUNICATIONS CABLING SYSTEM COMBINED WITH A COMMUNICATIONS RACEWAY SYSTEM.

CONCEALED: HIDDEN FROM SIGHT IN INTERSTITIAL BUILDING SPACES, CHASES, FURR ED SPACES, SHAFTS, CRAWL SPACES, ETC.

CONSTRUCTION DOCUMENTS: COLLECTIVE TERM FOR THE ENTIRE SET OF BOUND OR UNBO UND

MATERIAL DESCRIBING THE CONSTRUCTION AND SERVICES R EQUIRED, INCL UDING ALL

DRAWINGS, SPECIFICATIONS, ADDENDA ISSUED PRIOR TO E XECUTION OF T HE CONTRACT, AND

MODIFICATIONS ISSUED AFTER EXECUTION OF THE CONTRAC T (SUCH AS CH ANGE ORDERS, CONSTRUCTION CHANGE DIRECTIVES, SUPPLEMENTAL INSTRU CTIONS, ETC.) .

THE CONTRACTOR: THE PARTY RESPONSIBLE FOR PROVIDING THE SYSTEM(S) A S INDICATED HEREIN.

DRAWINGS: THE GRAPHIC AND PICTORIAL PORTIONS OF THE CONTRACT DOCUMENTS,

WHEREVER LOCATED AND WHENEVER ISSUED, SHOWING THE D ESIGN, LOCATI ON AND

DIMENSIONS OF THE WORK, GENERALLY INCLUDING (BUT NO T LIMITED TO) PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND/OR DIAGRAMS.

ENGINEER/CONSULTANT: THE PARTY RESPONSIBLE FOR PRODUCING THE COMMUNICATI ONS SYSTEM(S) CONSTRUCTION DOCUMENTS.

EXPOSED: NOT CONCEALED (SEE ABOVE) AND NOT INSTALLED UNDERGR OUND.

FINAL COMPLETION: THE DATE WHEN THE ENGINEER CONFIRMS IN WRITING THAT THE

CONTRACTOR HAS COMPLETED THE WORK IN ACCORDANCE WIT H THE CONSTRU CTION

DOCUMENTS, INCLUDING COMPLETION OF ALL PUNCH LIST I TEMS, CLEANUP WORK AND DELIVERY

OF ALL REQUIRED GUARANTEES, WARRANTIES, LICENSES, R ELEASES AND O THER REQUIRED DELIVERABLES.

FURNISH: TO PURCHASE, SUPPLY, AND DELIVER TO THE PROJECT MAT ERIALS IN NE W AND OPERABLE CONDITION, READY FOR INSTALLATION.

GOVERNING REQUIREMENTS: COLLECTIVE TERM FOR REGULATIONS, LAWS, ORDINANCES,

CODES, RULES, STANDARDS, REQUIREMENTS, AND GUIDELIN ES THAT GOVER N THE INSTALLATION AND INSPECTION OF THE WORK DEFINED IN THE CONTRACT DOCUMENTS. S EE “PART 1 – GENERAL, 1.8 GOVERNING REQUIREMENTS ” HEREIN.

GOVERNING AUTHORITIES: ENTITIES OR THEIR REPRESENTATIVES CHARGED WITH FORM ATION

AND/OR ENFORCEMENT OF GOVERNING REQUIREMENTS, SUCH AS THE AUTHOR ITY HAVING JURISDICTION (AHJ).

INSTALL: TO PLACE IN FINAL POSITION IN FULLY OPERABLE, TESTE D CONDITION.

INSIDE PLANT (ISP): INFRASTRUCTURE WITHIN A BUILDING; INCLUDES RACEWAYS , CABLING, TERMINATION COMPONENTS AND RACKS/CABINETS.

OR EQUAL, OR EQUIVALENT: MATERIALS APPROVED FOR USE BY THE ENGINEER AND WHIC H ARE DIMENSIONALLY SUITABLE AND OPERATIONALLY IDENTICAL TO THE SPECIF IED ITEM.

OUTSIDE PLANT (OSP): INFRASTRUCTURE EXTERIOR TO A BUILDING.

STATE: THE STATE AND THE STATE'S DESIGNATED REPRESENTATIVE (S).

THE PROJECT: THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE

CONTRACT DOCUMENTS MAY BE THE WHOLE OR A PART, AND WHICH MAY INC LUDE CONSTRUCTION BY THE STATE AND/OR SEPARATE CONTRACTO RS.

RCDD: REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNER
SUBSTANTIAL COMPLETION: THE DATE WHEN ALL WORK REQUIRED BY THE CONSTRUCTION

DOCUMENTS SHALL BE COMPLETE (SUBJECT TO THE FINAL P UNCH LIST TO BE PREPARED BY THE

ENGINEER) AND ON WHICH THE APPLICABLE JURISDICTIONA L AUTHORITIES HAVE ISSUED A TEMPORARY CERTIFICATION OF OCCUPANCY.

SECTION: AN INDIVIDUAL SECTION OF THE SPECIFICATIONS.

SHOWN ON DRAWINGS: NOTED, INDICATED, SCHEDULED, DETAILED, OR ANY OTHER WRITTEN REFERENCE MADE ON THE DRAWINGS.

SPECIFICATIONS: THE PORTION OF THE CONTRACT DOCUMENTS CONSISTING OF THE WRITTEN

REQUIREMENTS FOR MATERIALS, EQUIPMENT, CONSTRUCTION SYSTEMS, STA NDARDS AND WORKMANSHIP FOR THE WORK AND PERFORMANCE OF RELATED SERVICES.

SPECIFICATION SECTION(S): ONE OR MORE SECTIONS OF THE SPECIFICATIONS.

STRUCTURED CABLING SYSTEM (SCS): ALTERNATIVE TERM FOR COMMUNICATIONS CABLING SYSTEM
THE WORK: THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTR ACT DOCUMENT S,

WHETHER COMPLETED OR PARTIALLY COMPLETED, AND ALL O THER LABOR, M ATERIALS,

EQUIPMENT AND SERVICES PROVIDED OR TO BE PROVIDED B Y THE CONTRAC TOR TO FULFILL THE CONTRACTOR ’S OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE O R A PART OF T HE PROJECT.

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/25/2022 9:59:47 AM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM SPECIFICATION
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/29/21
2014226900
T-002
PART 2 - PRODUCTS

2.1 GENERAL
A. ALL MATERIALS AND EQUIPMENT INSTALLED SHALL HAVE BE EN TESTED AND LISTED BY UNDERWRITERS

LABORATORIES OR OTHER APPROVED TESTING ORGANIZATION AND SHALL B E SO LABELED UNLESS OTHERWISE PERMITTED BY THE AUTHORITY HAVING JURISDI CTION (INSPE CTOR).

B. ALL MATERIALS TO BE NEW, FREE FROM DEFECTS AND NOT LESS THAN QUALITY HEREIN SPECIFIED.

MATERIALS SHALL BE DESIGNATED TO INSURE SATISFACTOR Y OPERATION AND OPERATIONAL LIFE IN THE ENVIRONMENTAL CONDITIONS WHICH WILL PREVAIL WHERE T HEY ARE BEIN G INSTALLED.

C. EACH TYPE OF MATERIALS FURNISHED SHALL BE OF THE SA ME MAKE, B E STANDARD PRODUCTS OF

MANUFACTURERS REGULARLY ENGAGED IN PRODUCTION OF SU CH MATERIALS AND BE THE MANUFACTURER'S LATEST STANDARD DESIGN.

D. ALL MATERIALS, EQUIPMENT AND SYSTEMS FURNISHED THAT INCLUDE P ROVISIONS FOR STORING,

DISPLAYING, REPORTING, INTERFACING, INPUTTING, OR F UNCTIONING U SING DATE SPECIFIC INFORMATION SHALL PERFORM PROPERLY IN ALL RESPECTS REGARDLESS O F THE CENTUR Y. ANY INTERFACE TO OTHER

NEW OR EXISTING MATERIALS, EQUIPMENT OR SYSTEMS SHA LL FUNCTION PROPERLY AND SHALL BE CENTURY COMPLIANT, BOTH IN REGARD TO INFORMATION SE NT AND RECEI VED.

2.2 SUBSTITUTION OF MATERIALS
A. IN ALL CASES, SHOULD A SUBSTITUTED MATERIAL RESULT IN REQUIRI NG SYSTEM OR BUILDING MODIFICATIONS; THE CONTRACTOR ALONE SHALL PAY ALL C OSTS TO PROV IDE THESE MODIFICATIONS

INCLUDING ALL COSTS TO THE ENGINEER AND STATE FOR R EDESIGN, AND UPDATING OF RECORD DRAWINGS REQUIRED TO ACCOMMODATE THE REQUIRED MODIF ICATIONS.

PART 3 - EXECUTION

3.1 PRODUCT DELIVERY, STORAGE AND HANDLING
A. DELIVER, STORE, AND HANDLE PRODUCTS ACCORDING TO TH E MANUFACT URER'S RECOMMENDATIONS,

USING MEANS AND METHODS THAT WILL PREVENT DAMAGE, D ETERIORATION , AND LOSS, INCLUDING THEFT. HANDLE ALL EQUIPMENT CAREFULLY TO PREVENT D AMAGE, BREAK AGE, DENTING, AND SCORING OF FINISHES. DO NOT INSTALL DAMAGED EQUIPMENT.

B. STORE PRODUCTS SUBJECT TO DAMAGE BY THE ELEMENTS AB OVE GROUND , UNDERCOVER IN A WEATHER TIGHT ENCLOSURE, WITH VENTILATION ADEQUATE TO PREVE NT CONDENSAT ION. MAINTAIN TEMPERATURE AND HUMIDITY WITHIN RANGE REQUIRED BY MANUFACTURER' S INSTRUCTIO N.

3.2 CUTTING BUILDING CONSTRUCTION
A. OBTAIN PERMISSION FROM THE STATE AND COORDINATE WIT H OTHER TR ADES PRIOR TO CUTTING.

LOCATE CUTTINGS SO THEY WILL NOT WEAKEN STRUCTURAL COMPONENTS. CUT CAREFULLY AND ONLY THE MINIMUM AMOUNT NECESSARY. CUT CONCRETE WITH DI AMOND CORE D RILLS OR CONCRETE SAWS EXCEPT WHERE SPACE LIMITATIONS PREVENT THE USE OF S UCH TOOLS.

B. ALL CONSTRUCTION MATERIALS DAMAGED OR CUT INTO DURI NG THE INS TALLATION OF THIS WORK MUST

BE REPAIRED OR REPLACED WITH MATERIALS OF LIKE KIND AND QUALITY AS ORIGINAL MATERIALS BY SKILLED LABOR EXPERIENCED IN THAT PARTICULAR BUILDI NG TRADE.

3.3 FIRESTOPPING
A. APPLY FIRESTOPPING TO COMMUNICATIONS PENETRATIONS O F FIRE RAT ED FLOOR AND WALL ASSEMBLIES TO MAINTAIN FIRE -RESISTANCE RATING OF THE ASSEMBLY.

3.4 EQUIPMENT CONNECTION
A. FOR EQUIPMENT FURNISHED UNDER THIS OR OTHER DIVISIO NS OF THE SPECIFICATIONS, OR BY THE

STATE, PROVIDE COMPLETE ALL CONNECTIONS NECESSARY T O SERVE SUCH EQUIPMENT AND PROVIDE

REQUIRED CONTROL CONNECTIONS TO ALL EQUIPMENT SO TH AT THE EQUIP MENT IS FULLY OPERATIONAL UPON COMPLETION OF THE PROJECT.

B. INVESTIGATE EXISTING EQUIPMENT TO BE RELOCATED AND PROVIDE NE W CONNECTIONS AS REQUIRED.

C. OBTAIN ROUGH -IN REQUIREMENTS FOR EQUIPMENT FURNISHED UNDER OT HER DIVISIONS OF THIS SPECIFICATION PRIOR TO ROUGHING -IN. REVIEW SHOP DRAWINGS AND S UBMITTALS OF OTHER DIVISIONS TO DETERMINE REQUIREMENTS.

3.5 CLEAN UP
A. CONTRACTOR SHALL CONTINUALLY REMOVE DEBRIS, CUTTING S, CRATES, CARTONS, ETC., CREATED BY THIS WORK. SUCH CLEAN UP SHALL BE DONE DAILY AND A T SUFFICIENT FREQUENCY TO ELIMINATE HAZARD TO THE PUBLIC, OTHER WORKERS, THE BUILDING O R THE STATE. BEFORE ACCEPTANCE OF THE

INSTALLATION, CONTRACTOR SHALL CAREFULLY CLEAN CABI NETS, PANELS , LIGHTING FIXTURES, WIRING DEVICES, COVER PLATES, ETC., TO REMOVE DIRT, CUTTIN GS, PAINT, P LASTER, MORTAR, CONCRETE, ETC.

BLEMISHES TO FINISHED SURFACES OF APPARATUS SHALL B E REMOVED AN D NEW FINISH EQUAL TO THE ORIGINAL APPLIED.

1. WIPE SURFACES OF LOW VOLTAGE EQUIPMENT. REMOVE EXC ESS LUBRIC ATION, PAINT AND MORTAR DROPPINGS, AND OTHER FOREIGN SUBSTANCES.

2. EQUIPMENT INSTALLED PRIOR TO FINAL CLEAN -UP SHALL BE CLEANED BY THE CONTRACTOR. JACKS

AND PATCH PANELS THAT HAVE CONSTRUCTION DIRT AND DU ST SHALL BE CLEANED TO LIKE NEW CONDITION.

3.6 TESTING AND DEMONSTRATION
A. DEMONSTRATE THAT ALL EQUIPMENT OPERATES AS SPECIFIE D AND IN A CCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. PERFORM TESTS IN THE PRESENCE OF THE STATE. PROVIDE ALL

INSTRUMENTS, MANUFACTURER'S OPERATING INSTRUCTIONS AND PERSONNE L REQUIRED TO CONDUCT THE TESTS. REPAIR OR REPLACE ANY EQUIPMENT THAT FAILS TO OPERATE AS SPECIFIED AND OR IN ACCORDANCE WITH MANUFACTURER'S REQUIREMEN TS.

END OF SECTION

2.5 TELECOMMUNICATIONS OUTLET/CONNECTORS
A. JACKS: 100 -OHM, BALANCED, TWISTED -PAIR CONNECTOR; FOUR -PAIR, EIGHT -POSITION MODULAR. COMPLY WITH ANSI/TIA -568 -C.1.

B. WORKSTATION OUTLETS: TWO PORT -CONNECTOR ASSEMBLIES MOUNTED I N SINGLE FACEPLATE.

1. FACEPLATE: MATCH EXISTING

2. FOR USE WITH SNAP -IN JACKS ACCOMMODATING ANY COMBINATION OF UTP a. FLUSH MOUNTING JACKS, POSITIONING THE CORD AT A 45 -DEGREE ANGLE.

3. LEGEND: MACHINE PRINTED, IN THE FIELD, USING ADHES IVE -TAPE LABEL.

4. LEGEND: SNAP -IN, CLEAR -LABEL COVERS AND MACHINE -PRINTED PAP ER INSERTS.

2.6 GROUNDING
A. COMPLY WITH REQUIREMENTS IN SECTION 26 05 00 COMMON WORK RESU LTS FOR ELECTRICAL FOR GROUNDING CONDUCTORS AND CONNECTORS.

B. COMPLY WITH ANSI/TIA J -STD -607 -C.

2.7 IDENTIFICATION PRODUCTS
A. COMPLY WITH ANSI/TIA -606 -B AND UL 969 FOR LABELING MATERIALS, INCLUDING LABEL STOCKS, LAMINATING ADHESIVES, AND INKS USED BY LABEL PRINTE RS.

B. MATCH EXISTING IDENTIFICATION NOMENCLATURE.

PART 3 - EXECUTION

3.1 WIRING METHODS
A. ALL EXISTING CABLES TO REMAIN ARE TO BE TESTED AND REPAIRED.

B. ALL EXISTING PATCH PANELS ARE TO BE REPAIRED AS NEE DED AND LA BELED. COORDINATE PATCHING SCHEDULE WITH GTRANS.

C. ALL NEW PATCH PANELS ARE TO BE LABELED. COORDINATE PATCHING S CHEDULE WITH GTRANS.

D. LOW VOLTAGE VENDOR TO MOUNT GTRANS PROVIDED NETWORK EQUIPMENT ON TO RACK.

E. LOW VOLTAGE VENDOR TO MOUNT AND CONNECT UPS.

F. LOW VOLTAGE VENDOR TO INSTALL WALL PHONE MOUNTING H ARDWARE WI TH WALL PHONE.

G. INSTALL CABLES IN PATHWAYS EXCEPT WITHIN CONSOLES, CABINETS, DESKS, AND COUNTERS.

CONCEAL PATHWAYS AND CABLES EXCEPT IN UNFINISHED SPACES.

1. INSTALL PLENUM CABLE IN ENVIRONMENTAL AIR SPACES, I NCLUDING PLENUM CEILINGS.

H. CONCEAL CONDUCTORS AND CABLES IN ACCESSIBLE CEILING S, WALLS, AND FLOORS WHERE POSSIBLE.

I. WIRING WITHIN ENCLOSURES:

1. BUNDLE, LACE, AND TRAIN CONDUCTORS TO TERMINAL POIN TS WITH N O EXCESS AND WITHOUT EXCEEDING MANUFACTURER'S LIMITATIONS ON BENDING RAD II.

2. INSTALL LACING BARS AND DISTRIBUTION SPOOLS.

3. INSTALL CONDUCTORS PARALLEL WITH OR AT RIGHT ANGLES TO SIDES AND BACK OF ENCLOSURE.

3.2 INSTALLATION OF CABLES
A. COMPLY WITH NECA 1.

B. GENERAL REQUIREMENTS FOR CABLING:

1. COMPLY WITH ANSI/TIA -568 -C.1.

2. COMPLY WITH BICSI ITSIM, "CABLE TERMINATION PRACTICES."

3. INSTALL 110 -STYLE IDC TERMINATION HARDWARE UNLESS OTHERWISE INDICATED.

4. MUTOA SHALL NOT BE USED AS A CROSS -CONNECT POINT.

5. CONSOLIDATION POINTS MAY BE USED ONLY FOR MAKING A DIRECT CO NNECTION TO TELECOMMUNICATIONS OUTLET/CONNECTORS:
a. DO NOT USE CONSOLIDATION POINT AS A CROSS -CONNECT POINT, AS A PA TCH CONNECTION, OR FOR DIRECT CONNECTION TO WORKSTATION EQUIPMENT. b. LOCATE CONSOLIDATION POINTS FOR UTP AT LEAST 49 FEE T (15 M) FROM COMMUNICATIONS EQUIPMENT ROOM.

6. TERMINATE CONDUCTORS; NO CABLE SHALL CONTAIN UNTERM INATED EL EMENTS. MAKE

TERMINATIONS ONLY AT INDICATED OUTLETS, TERMINALS, CROSS -CONNE CTS, AND PATCH PANELS.

7. CABLES MAY NOT BE SPLICED. SECURE AND SUPPORT CABL ES AT INT ERVALS NOT EXCEEDING 30 INCHES (760 MM) AND NOT MORE THAN 6 IN CHES (150 M M) FROM CABINETS, BOXES, FITTINGS, OUTLETS, RACKS, FRAMES, AND TERMIN ALS.

8. INSTALL LACING BARS TO RESTRAIN CABLES, TO PREVENT STRAINING CONNECTIONS, AND TO

PREVENT BENDING CABLES TO SMALLER RADII THAN MINIMUMS RECOM ME NDED BY MANUFACTURER.

9. BUNDLE, LACE, AND TRAIN CONDUCTORS TO TERMINAL POIN TS WITHOU T EXCEEDING

MANUFACTURER'S LIMITATIONS ON BENDING RADII, BUT NO T LESS THAN RADII SPECIFIED IN BICSI ITSIM, "CABLING TERMINATION PRACTICES" CHAPTER. IN STALL LACING BARS AND DISTRIBUTION SPOOLS.

SECTION 27 15 00

COMMUNICATIONS HORIZONTAL CABLING
PART 1 - GENERAL

1.1 SUMMARY
A. SECTION INCLUDES:

1. UTP CABLING.

2. MULTIUSER TELECOMMUNICATIONS OUTLET ASSEMBLIES.

3. CABLE CONNECTING HARDWARE, PATCH PANELS, AND CROSS -CONNECTS.

4. TELECOMMUNICATIONS OUTLET/CONNECTORS.

5. CABLING SYSTEM IDENTIFICATION PRODUCTS.

6. CABLE MANAGEMENT SYSTEM.

1.2 DEFINITIONS
A. BICSI: BUILDING INDUSTRY CONSULTING SERVICE INTERN ATIONAL.

B. CONSOLIDATION POINT: A LOCATION FOR INTERCONNECTIO N BETWEEN HORIZONTAL CABLES

EXTENDING FROM BUILDING PATHWAYS AND HORIZONTAL CABLES EXTENDI NG INTO FURNITURE PATHWAYS.

C. CROSS -CONNECT: A FACILITY ENABLING THE TERMINATION OF CA BLE ELEMENTS AND THEIR INTERCONNECTION OR CROSS -CONNECTION.

D. EMI: ELECTROMAGNETIC INTERFERENCE.

E. IDC: INSULATION DISPLACEMENT CONNECTOR.

F. LAN: LOCAL AREA NETWORK.

G. OUTLET/CONNECTORS: A CONNECTING DEVICE IN THE WORK AREA ON W HICH HORIZONTAL CABLE OR OUTLET CABLE TERMINATES.

H. RCDD: REGISTERED COMMUNICATIONS DISTRIBUTION DESIG NER.

I. UTP: UNSHIELDED TWISTED PAIR.

1.3 ADMINISTRATIVE REQUIREMENTS
A. COORDINATE LAYOUT AND INSTALLATION OF TELECOMMUNICA TIONS CABL ING WITH GTRANS TELECOMMUNICATIONS AND LAN EQUIPMENT AND SERVICE SU PPLIERS.

B. COORDINATE TELECOMMUNICATIONS OUTLET/CONNECTOR LOCA TIONS WITH LOCATION OF POWER RECEPTACLES AT EACH WORK AREA.

1.4 SUBMITTALS
A. GENERAL: PROVIDE SUBMITTAL INFORMATION IN ACCORDANC E WITH SEC TION 27 05 00 - COMMON

WORK RESULTS FOR COMMUNICATIONS AND SUPPLEMENTARY REQUIR EMENTS DESCRIBED IN THIS SPECIFICATION.

B. PRODUCT DATA: FOR EACH TYPE OF PRODUCT.

1. PROVIDE SUBMITTALS AS REQUIRED IN SECTION 27 05 00.

C. SHOP DRAWINGS:

1. PROVIDE SHOP DRAWINGS AS REQUIRED IN SECTION 27 05 00.

D. AS -BUILTS

1. PROVIDE TELECOM SERVICE OUTLET (TSO) PLANS WITH ALL TSOS AS LABELED.

1.5 INFORMATIONAL SUBMITTALS

1.6 CLOSEOUT SUBMITTALS
A. CLOSEOUT SUBMITTALS – IN ACCORDANCE WITH SECTION 27 05 00.

1.7 QUALITY ASSURANCE
A. INSTALLER MUST BE A COMMSCOPE CERTIFIED BUSINESS PA RTNER.

B. INSTALLER QUALIFICATIONS: CABLING INSTALLER MUST H AVE PERSON NEL CERTIFIED BY BICSI ON STAFF.

1. LAYOUT RESPONSIBILITY: PREPARATION OF SHOP DRAWING S CABLING ADMINISTRATION DRAWINGS, AND FIELD TESTING PROGRAM DEVELOPMENT BY AN RCDD.

2. INSTALLATION SUPERVISION: INSTALLATION SHALL BE UN DER THE D IRECT SUPERVISION OF

REGISTERED TECHNICIAN, WHO SHALL BE PRESENT AT ALL TIMES WHEN WORK OF THIS SECTION IS PERFORMED AT PROJECT SITE.

C. TESTING AGENCY QUALIFICATIONS: AN NRTL.

1. TESTING AGENCY'S FIELD SUPERVISOR: CURRENTLY CERTI FIED BY B ICSI AS AN RCDD TO SUPERVISE ON -SITE TESTING.

1.8 DELIVERY, STORAGE, AND HANDLING
A. TEST CABLES UPON RECEIPT AT PROJECT SITE.

1. TEST EACH PAIR OF UTP CABLE FOR OPEN AND SHORT CIRC UITS.

PART 2 - PRODUCTS

2.1 HORIZONTAL CABLING DESCRIPTION
A. HORIZONTAL CABLE AND ITS CONNECTING HARDWARE PROVID E THE MEAN S OF TRANSPORTING SIGNALS

BETWEEN THE TELECOMMUNICATIONS OUTLET/CONNECTOR AND THE HORIZON TAL CROSS -CONNECT LOCATED IN THE COMMUNICATIONS EQUIPMENT ROOM. THIS CABLING AND ITS CONNECTING HARDWARE ARE CALLED A "PERMANENT LINK," A TERM THAT IS USED IN THE TESTI NG PROTOCOLS.

1. ANSI/TIA -568 -C.1 REQUIRES THAT A MINIMUM OF TWO TELECOMMUNI CATIONS OUTLET/CONNECTORS BE INSTALLED FOR EACH WORK AREA.

2. HORIZONTAL CABLING SHALL CONTAIN NO MORE THAN ONE T RANSITION POINT OR CONSOLIDATION

POINT BETWEEN THE HORIZONTAL CROSS -CONNECT AND THE TELECOMMUNI CATIONS OUTLET/CONNECTOR.

3. BRIDGED TAPS AND SPLICES SHALL NOT BE INSTALLED IN THE HORIZ ONTAL CABLING.

4. SPLITTERS SHALL NOT BE INSTALLED AS PART OF THE OPT ICAL FIBE R CABLING.

B. A WORK AREA IS APPROXIMATELY 100 SQ. FT. (9.3 SQ. M), AND INC LUDES THE COMPONENTS THAT EXTEND FROM THE TELECOMMUNICATIONS OUTLET/CONNECTORS TO TH E STATION EQ UIPMENT.

C. THE MAXIMUM ALLOWABLE HORIZONTAL CABLE LENGTH IS 29 5 FEET (90 M). THIS MAXIMUM ALLOWABLE LENGTH DOES NOT INCLUDE AN ALLOWANCE FOR THE LENGTH OF 16 FEET (4.9 M) TO THE WORKSTATION EQUIPMENT OR IN THE HORIZONTAL CROSS -CONNECT.

2.2 PERFORMANCE REQUIREMENTS
A. GENERAL PERFORMANCE: HORIZONTAL CABLING SYSTEM SHA LL COMPLY WITH TRANSMISSION STANDARDS IN ANSI/TIA -568 -C.1 WHEN TESTED ACCORDING TO TEST PRO CEDURES OF THIS STANDARD.

B. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: L ISTED AND LABELED AS DEFINED IN NFPA 70, BY A QUALIFIED TESTING AGENCY, AND MARKED FOR INTEN DED LOCATION AND APPLICATION.

C. GROUNDING: COMPLY WITH ANSI/TIA -607 -C.

2.3 UTP CABLE
A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREM ENTS, PROV IDE PRODUCTS BY ONE OF THE FOLLOWING:

1. HYPERLINK "HTTP://WWW.SPECAGENT.COM/LOOKUP/?UID=123 45681855 8&MF=04&SRC=WD"

COMMSCOPE INC - UNIPRISE SERIES
B. DESCRIPTION: 100 -OHM, FOUR -PAIR UTP, COVERED WITH A BLUE THE RMOPLASTIC JACKET.

1. COMPLY WITH ICEA S-90 -661 FOR MECHANICAL PROPERTIES.

2. COMPLY WITH ANSI/TIA -568 -C.1 FOR PERFORMANCE SPECIFICATIONS.

3. COMPLY WITH ANSI/TIA -568 -C.2, CATEGORY 6A.

4. LISTED AND LABELED BY AN NRTL ACCEPTABLE TO AUTHORI TIES HAVI NG JURISDICTION AS COMPLYING WITH UL 444 AND NFPA 70 FOR THE FOLLOWING TYPES:
a. COMMUNICATIONS, PLENUM RATED: TYPE CMP

2.4 UTP CABLE HARDWARE
A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREM ENTS, PROV IDE PRODUCTS BY ONE OF THE FOLLOWING:
a. COMMSCOPE INC. - UNIPRISE SERIES
B. GENERAL REQUIREMENTS FOR CABLE CONNECTING HARDWARE: COMPLY W ITH ANSI/TIA -568 -C.2, IDC TYPE, WITH MODULES DESIGNED FOR PUNCH -DOWN CAPS OR TOOLS. CABLES SHA LL BE TERMINATED WITH CONNECTING HARDWARE OF SAME CATEGORY OR HIGHER.

C. PATCH PANEL: MODULAR PANELS HOUSING MULTIPLE -NUMBERED JACK U NITS WITH IDC -TYPE CONNECTORS AT EACH JACK FOR PERMANENT TERMINATION O F PAIR GROUP S OF INSTALLED CABLES.

1. NUMBER OF JACKS PER FIELD: ONE FOR EACH FOUR -PAIR UTP CABLE INDICATED D. JACKS AND JACK ASSEMBLIES: MODULAR, COLOR -CODED, EIGHT -POSIT ION MODULAR RECEPTACLE UNITS WITH INTEGRAL IDC -TYPE TERMINALS.

E. PATCH CORDS: FACTORY -MADE, FOUR -PAIR CABLES IN 48 -INCH (1200 -MM) LENGTHS; TERMINATED WITH EIGHT -POSITION MODULAR PLUG AT EACH END.

1. PATCH CORDS SHALL HAVE BEND -RELIEF -COMPLIANT BOOTS AND COLOR -CODED ICONS TO ENSURE CATEGORY 6A PERFORMANCE. PATCH CORDS SHALL HAVE LATCH GUARD S TO PROTECT AGAINST SNAGGING.

2. PATCH CORDS SHALL HAVE COLOR -CODED BOOTS FOR CIRCUIT IDENTIF ICATION.

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/25/2022 9:59:51 AM
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM SPECIFICATION
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/29/21
2014226900
T-003
D. CABLE SCHEDULE: POST IN PROMINENT LOCATION IN EACH EQUIPMENT ROOM AND WIRING CLOSET. LIST INCOMING AND OUTGOING CABLES AND THEIR DESIGNATIONS , ORIGINS, A ND DESTINATIONS. PROTECT WITH RIGID FRAME AND CLEAR PLASTIC COVER. FURNISH AN ELECTRONI C COPY OF FINAL COMPREHENSIVE SCHEDULES FOR PROJECT.

E. CABLING ADMINISTRATION DRAWINGS: SHOW BUILDING FLO OR PLANS W ITH CABLING ADMINISTRATION - POINT LABELING. IDENTIFY LABELING CONVENTION AND S HOW LABELS F OR TELECOMMUNICATIONS

CLOSETS, TERMINAL HARDWARE AND POSITIONS, HORIZONTA L CABLES, WO RK AREAS AND WORKSTATION TERMINAL POSITIONS, GROUNDING BUSES AND PATHWAYS, A ND EQUIPMENT GROUNDING CONDUCTORS.

FOLLOW CONVENTION OF ANSI/TIA -606 -B. FURNISH ELECTRONIC RECORD OF ALL DRAWINGS, IN SOFTWARE AND FORMAT SELECTED BY THE GTRANS.

F. CABLE AND WIRE IDENTIFICATION:

1. LABEL EACH CABLE WITHIN 4 INCHES (100 MM) OF EACH T ERMINATIO N AND TAP, WHERE IT IS ACCESSIBLE IN A CABINET OR JUNCTION OR OUTLET BOX, AND ELSEWHE RE AS INDICATED.

2. EACH WIRE CONNECTED TO BUILDING -MOUNTED DEVICES IS NOT REQUI RED TO BE NUMBERED AT

DEVICE IF COLOR OF WIRE IS CONSISTENT WITH ASSOCIAT ED WIRE CON NECTED AND NUMBERED WITHIN PANEL OR CABINET.

3. EXPOSED CABLES AND CABLES IN CABLE TRAYS AND WIRE T ROUGHS: LABEL EACH CABLE AT INTERVALS NOT EXCEEDING 15 FEET (4.5 M).

4. LABEL EACH TERMINAL STRIP AND SCREW TERMINAL IN EAC H CABINET , RACK, OR PANEL. a. INDIVIDUALLY NUMBER WIRING CONDUCTORS CONNECTED TO TERMINAL STRI PS, AND IDENTIFY

EACH CABLE OR WIRING GROUP BEING EXTENDED FROM A PA NEL OR CABINE T TO A BUILDING -

MOUNTED DEVICE SHALL BE IDENTIFIED WITH NAME AND NU MBER OF PARTI CULAR DEVICE AS SHOWN.
b. LABEL EACH UNIT AND FIELD WITHIN DISTRIBUTION RACKS AND FRAMES.

5. IDENTIFICATION WITHIN CONNECTOR FIELDS IN EQUIPMENT ROOMS AN D WIRING CLOSETS: LABEL EACH CONNECTOR AND EACH DISCRETE UNIT OF CABLE -TERMINATING AND CONN ECTING HARDWARE.

WHERE SIMILAR JACKS AND PLUGS ARE USED FOR BOTH VOI CE AND DATA COMMUNICATION CABLING, USE A DIFFERENT COLOR FOR JACKS AND PLUGS OF EACH S ERVICE.

6. UNIQUELY IDENTIFY AND LABEL WORK AREA CABLES EXTEND ING FROM THE MUTOA TO THE WORK AREA. THESE CABLES MAY NOT EXCEED THE LENGTH STATE D ON THE MU TOA LABEL.

G. LABELS SHALL BE PREPRINTED OR COMPUTER -PRINTED TYPE WITH PRIN TING AREA AND FONT COLOR

THAT CONTRASTS WITH CABLE JACKET COLOR BUT STILL CO MPLIES WITH REQUIREMENTS IN ANSI/TIA -606 -B.

1. CABLES USE FLEXIBLE VINYL OR POLYESTER THAT FLEX AS CABLES A RE BENT.

3.6 FIELD QUALITY CONTROL
A. TESTING AGENCY: ENGAGE A QUALIFIED TESTING AGENCY T O PERFORM TESTS AND INSPECTIONS.

B. MANUFACTURER'S FIELD SERVICE: ENGAGE A FACTORY -AUTHORIZED SE RVICE REPRESENTATIVE TO TEST AND INSPECT COMPONENTS, ASSEMBLIES, AND EQUIPMENT I NSTALLATIONS , INCLUDING CONNECTIONS.

C. PERFORM THE FOLLOWING TESTS AND INSPECTIONS WITH TH E ASSISTAN CE OF A FACTORY -AUTHORIZED SERVICE REPRESENTATIVE:

1. VISUALLY INSPECT UTP AND OPTICAL FIBER CABLE JACKET MATERIAL S FOR NRTL CERTIFICATION MARKINGS. INSPECT CABLING TERMINATIONS IN COMMUNIC ATIONS EQUI PMENT ROOMS FOR

COMPLIANCE WITH COLOR -CODING FOR PIN ASSIGNMENTS, AND INSPECT CABLING CONNECTIONS FOR COMPLIANCE WITH ANSI/TIA -568 -C.1.

2. VISUALLY CONFIRM CATEGORY 6A, MARKING OF OUTLETS, COVER PLAT ES, OUTLET/CONNECTORS, AND PATCH PANELS.

3. VISUALLY INSPECT CABLE PLACEMENT, CABLE TERMINATION , GROUNDI NG AND BONDING, EQUIPMENT AND PATCH CORDS, AND LABELING OF ALL COMPONENTS.

4. TEST UTP BACKBONE COPPER CABLING FOR DC LOOP RESIST ANCE, SHO RTS, OPENS, INTERMITTENT FAULTS, AND POLARITY BETWEEN CONDUCTORS. TEST OPER ATION OF SH ORTING BARS IN CONNECTION BLOCKS. TEST CABLES AFTER TERMINATION B UT NOT CROS S-CONNECTION. a. TEST INSTRUMENTS SHALL MEET OR EXCEED APPLICABLE RE QUIREMENTS IN ANSI/TIA -568 -C.2.

PERFORM TESTS WITH A TESTER THAT COMPLIES WITH PERF ORMANCE REQUI REMENTS IN "TEST INSTRUMENTS (NORMATIVE)" ANNEX, COMPLYING WITH MEAS UREMENT ACCUR ACY SPECIFIED IN "MEASUREMENT ACCURACY (INFORMATIVE)" ANNEX. USE ON LY TEST CORDS AND ADAPTERS THAT

ARE QUALIFIED BY TEST EQUIPMENT MANUFACTURER FOR CH ANNEL OR LINK TEST CONFIGURATION.

5. UTP PERFORMANCE TESTS:
a. TEST FOR EACH OUTLET AND MUTOA. PERFORM THE FOLLOW ING TESTS ACC ORDING TO ANSI/TIA -568 -C.1 AND ANSI/TIA -568 -C.2:
1) WIRE MAP.
2) LENGTH (PHYSICAL VS. ELECTRICAL, AND LENGTH REQUIRE MENTS). 3) INSERTION LOSS.
4) NEAR -END CROSSTALK (NEXT) LOSS.
5) POWER SUM NEAR -END CROSSTALK (PSNEXT) LOSS.
6) EQUAL -LEVEL FAR -END CROSSTALK (ELFEXT).
7) POWER SUM EQUAL -LEVEL FAR -END CROSSTALK (PSELFEXT). 8) RETURN LOSS.
9) PROPAGATION DELAY.
10) DELAY SKEW.

6. FINAL VERIFICATION TESTS: PERFORM VERIFICATION TES TS FOR UT P SYSTEMS AFTER THE COMPLETE COMMUNICATIONS CABLING AND WORKSTATION OUTLET/CONNE CTORS ARE I NSTALLED. a. VOICE TESTS: THESE TESTS ASSUME THAT DIAL TONE SER VICE HAS BEEN INSTALLED. CONNECT TO THE NETWORK INTERFACE DEVICE AT THE DEMARCATION POI NT. GO OFF -HOOK AND LISTEN AND RECEIVE A DIAL TONE. IF A TEST NUMBER IS AVAILABLE , MAKE AND RE CEIVE A LOCAL, LONG DISTANCE, AND DIGITAL SUBSCRIPTION LINE TELEPHONE CALL.
b. DATA TESTS: THESE TESTS ASSUME THE INFORMATION TEC HNOLOGY STAFF HAS A NETWORK INSTALLED AND IS AVAILABLE TO ASSIST WITH TESTING. CONNECT T O THE NETWORK INTERFACE DEVICE AT THE DEMARCATION POINT. LOG ONTO THE NETWORK TO ENSURE PROPER CONNEC TION TO THE NETWORK.

D. DOCUMENT DATA FOR EACH MEASUREMENT. DATA FOR SUBMI TTALS SHAL L BE PRINTED IN A SUMMARY

REPORT THAT IS FORMATTED IN BICSI TDMM, OR TRANSFERRED FROM THE INSTRUMENT TO THE COMPUTER, SAVED AS TEXT FILES, AND PRINTED AND SUBM ITTED.

E. END -TO -END CABLING WILL BE CONSIDERED DEFECTIVE IF IT DOES NO T PASS TESTS AND INSPECTIONS.

F. PREPARE TEST AND INSPECTION REPORTS.

END OF SECTION

10. DO NOT INSTALL BRUISED, KINKED, SCORED, DEFORMED, O R ABRADE D CABLE. DO NOT SPLICE CABLE BETWEEN TERMINATION, TAP, OR JUNCTION POINTS. RE MOVE AND DISCARD CABLE IF DAMAGED DURING INSTALLATION AND REPLACE IT WITH NEW CABLE.

11. COLD -WEATHER INSTALLATION: BRING CABLE TO ROOM TEMPERAT URE BEFORE DEREELING. HEAT LAMPS SHALL NOT BE USED FOR HEATING.

12. IN THE COMMUNICATIONS EQUIPMENT ROOM, INSTALL A 10 -FOOT - (3 -M-) LONG SERVICE LOOP ON EACH END OF CABLE.

13. PULLING CABLE: COMPLY WITH BICSI ITSIM, "PULLING CABLE." MONITOR CABLE PULL TENSIONS.

C. UTP CABLE INSTALLATION:

1. COMPLY WITH ANSI/TIA -568 -C.2.

2. DO NOT UNTWIST UTP CABLES MORE THAN 1/2 INCH (12 MM ) FROM TH E POINT OF TERMINATION TO MAINTAIN CABLE GEOMETRY.

3. LOW VOLTAGE VENDOR TO TEST EXISTING CABLING AND REP AIR AS NE EDED.

4. LOW VOLTAGE
D. OPEN -CABLE INSTALLATION:

1. INSTALL CABLING WITH HORIZONTAL AND VERTICAL CABLE GUIDES IN TELECOMMUNICATIONS SPACES WITH TERMINATING HARDWARE AND INTERCONNECTION EQUIP MENT.

2. SUSPEND UTP CABLE NOT IN A WIREWAY OR PATHWAY A MIN IMUM OF 8 INCHES (200 MM) ABOVE CEILINGS BY CABLE SUPPORTS NOT MORE THAN 48 INCHES (1219 MM) A PART.

3. CABLE SHALL NOT BE RUN THROUGH STRUCTURAL MEMBERS O R IN CONT ACT WITH PIPES, DUCTS, OR OTHER POTENTIALLY DAMAGING ITEMS.

E. INSTALLATION OF CABLE ROUTED IN WET LISTED LOCATION S:

1. INSTALL OUTDOOR OR OUTDOOR/INDOOR RATED CABLE ONLY.

2. CABLES MUST BE TRANSITIONED FROM OUTDOOR RATED CABL ING TO IN DOOR RATED CABLING IN A CONSOLIDATION POINT OR TERMINATE ON EQUIPMENT WITHI N 50 -FEET O F ENTERING THE BUILDING.

F. GROUP CONNECTING HARDWARE FOR CABLES INTO SEPARATE LOGICAL FI ELDS.

G. SEPARATION FROM EMI SOURCES:

1. COMPLY WITH BICSI TDMM AND ANSI/TIA -569 -D FOR SEPARATING UNS HIELDED COPPER VOICE AND DATA

COMMUNICATION CABLE FROM POTENTIAL EMI SOURCES, INC LUDING ELEC TRICAL POWER LINES AND EQUIPMENT.

2. SEPARATION BETWEEN OPEN COMMUNICATIONS CABLES OR CA BLES IN N ONMETALLIC RACEWAYS AND UNSHIELDED POWER CONDUCTORS AND ELECTRICAL EQUIPMEN T SHALL BE AS FOLLOWS:
a. ELECTRICAL EQUIPMENT RATING LESS THAN 2 KVA: A MIN IMUM OF 5 INC HES (127 MM). b. ELECTRICAL EQUIPMENT RATING BETWEEN 2 AND 5 KVA: A MINIMUM OF 1 2 INCHES (300 MM). c. ELECTRICAL EQUIPMENT RATING MORE THAN 5 KVA: A MIN IMUM OF 24 IN CHES (610 MM).

3. SEPARATION BETWEEN COMMUNICATIONS CABLES IN GROUNDE D METALLI C RACEWAYS AND UNSHIELDED POWER LINES OR ELECTRICAL EQUIPMENT SHAL L BE AS FOL LOWS:
a. ELECTRICAL EQUIPMENT RATING LESS THAN 2 KVA: A MIN IMUM OF 2 -1/2 INCHES (64 MM). b. ELECTRICAL EQUIPMENT RATING BETWEEN 2 AND 5 KVA: A MINIMUM OF 6 INCHES (150 MM). c. ELECTRICAL EQUIPMENT RATING MORE THAN 5 KVA: A MIN IMUM OF 12 IN CHES (300 MM).

4. SEPARATION BETWEEN COMMUNICATIONS CABLES IN GROUNDE D METALLI C RACEWAYS AND POWER

LINES AND ELECTRICAL EQUIPMENT LOCATED IN GROUNDED METALLIC CO NDUITS OR ENCLOSURES SHALL BE AS FOLLOWS:
a. ELECTRICAL EQUIPMENT RATING LESS THAN 2 KVA: NO RE QUIREMENT. b. ELECTRICAL EQUIPMENT RATING BETWEEN 2 AND 5 KVA: A MINIMUM OF 3 INCHES (76 MM). c. ELECTRICAL EQUIPMENT RATING MORE THAN 5 KVA: A MIN IMUM OF 6 INC HES (150 MM).

5. SEPARATION BETWEEN COMMUNICATIONS CABLES AND ELECTR ICAL MOTOR S AND TRANSFORMERS, 5 KVA OR HP AND LARGER: A MINIMUM OF 48 INCHES (1200 MM) .

6. SEPARATION BETWEEN COMMUNICATIONS CABLES AND FLUORE SCENT FIXT URES: A MINIMUM OF 5 INCHES (127 MM).

3.3 FIRESTOPPING
A. COMPLY WITH ANSI/TIA -569 -D, ANNEX A, "FIRESTOPPING." B. COMPLY WITH BICSI TDMM, "FIRESTOPPING SYSTEMS" ARTICLE.

3.4 GROUNDING
A. INSTALL GROUNDING ACCORDING TO BICSI TDMM, "GROUNDING, BONDIN G, AND ELECTRICAL PROTECTION" CHAPTER.

B. COMPLY WITH ANSI/TIA J -STD -607 -C.

3.5 IDENTIFICATION
A. IDENTIFY SYSTEM COMPONENTS, WIRING, AND CABLING COM PLYING WIT H ANSI/TIA -606 -B. COMPLY WITH REQUIREMENTS FOR IDENTIFICATION IN SECTION 26 05 00 .

1. ADMINISTRATION CLASS: 1.

2. COLOR -CODE CROSS -CONNECT FIELDS. APPLY COLORS TO VOICE AND DATA SERVICE BACKBOARDS, CONNECTIONS, COVERS, AND LABELS.

B. USING CABLE MANAGEMENT SYSTEM SOFTWARE SPECIFIED IN PART 2, D EVELOP CABLING ADMINISTRATION DRAWINGS FOR SYSTEM IDENTIFICATION, TESTING, AND MA NAGEMENT. U SE UNIQUE, ALPHANUMERIC

DESIGNATION FOR EACH CABLE AND LABEL CABLE, JACKS, CONNECTORS, AND TERMINALS TO WHICH IT CONNECTS WITH SAME DESIGNATION. AT COMPLETION, CAB LE AND ASSET MANAGEMENT SOFTWARE SHALL REFLECT AS -BUILT CONDITIONS.

C. PAINT AND LABEL COLORS FOR EQUIPMENT IDENTIFICATION SHALL COM PLY WITH ANSI/TIA -606 -B FOR CLASS 2. MATCH EXISTING

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
DEVICE

TECHNOLOGY CABLING SCHEDULE

DESIGNATION

CABLE QUANTITY
CAT6A HDMI PORT COUNT NOTES TYPE

FACEPLATE

REFERENCE DETAIL

FACEPLATE CABLE COLOR
2STANDARD OUTLET 2-PORT
8 8-PORT
A
B

STANDARD OUTLET
DS1 4DISPLAY 4-PORT
WIRELESS ACCESS POINT, CLG 2-PORT SURF. MT. BOX 2
NOTES:
4 4-PORT C STANDARD OUTLET
RG-6
DS2 2 1DISPLAY
P1 2 2-PORT STANDARD OUTLET
P2 4 4-PORT STANDARD OUTLET
COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

WAP
COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

COORDINATE EXACT LOCATIONS WITH THE OWNER WIFI ASESSMENT. 2-PORT
STANDARD HDMI OUTLET 2-PORT
1-PORT
AV1
AV2
1-PORT
1-PORT AV3
1 1
1 2

STANDARD HDMI OUTLET

STANDARD HDMI OUTLET
COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

AT NORMAL HEIGHT BELOW DISPLAY.

AT NORMAL HEIGHT FOR SECONDARY CONSOLE STATION.

AV4 STANDARD HDMI OUTLET COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

BLUE
BLUE
BLUE
BLUE
BLUE
BLUE
BLUE
BLUE

DEVICE DESIGNATION FLOOR CEILING TYPE WALL

TECHNOLOGY ROUGH-IN SCHEDULE

MOUNTING

FURNITURE CONDUIT REQUIREMENTS BACKBOX REQUIREMENTS MUDRING REQ UIREMENTS COMBINATION DEVICE REFERENCE DETAIL NOTES MOUNTING HEIGHT

STANDARD OUTLET A
B

STANDARD OUTLET
DS1 DISPLAY

WIRELESS ACCESS POINT, CLG
NOTES:

C STANDARD OUTLET
DS2 DISPLAY
P1 STANDARD OUTLET
P2 STANDARD OUTLET
WAP
STANDARD HDMI OUTLET AV1
AV2
AV3

STANDARD HDMI OUTLET

STANDARD HDMI OUTLET
AV4 STANDARD HDMI OUTLET
X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG 18"AFF, FLUSH, UON X (1) 1-1/2"C 4-11/16"SQ. x 2-1/8"D DOUBLE-GANG 18"AFF, FLUSH, UON X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG 18"AFF, FLUSH, UON X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG
X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG
X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG 18"AFF, FLUSH, UON X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG 18"AFF, FLUSH, UON X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG CEILING, FLUSH X (1) 2"C
X (1) 2"C
X (1) 2"C
X (1) 2"C
COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

COORDINATE EXACT LOCATIONS WITH THE OWNER WIFI ASESSMENT.

COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

AT NORMAL HEIGHT BELOW DISPLAY.

AT NORMAL HEIGHT FOR SECONDARY CONSOLE STATION.

COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

FURNITURE FEED.
5/T501
6/T501
4/T501
4/T501
5/T501
4/T501
4/T502, 7/T502
1/T501, 2/T501
1/T501
1/T501
2/T501
D
1OUTLET FOR TIME DISPLAY 2-PORT COORDINATE MOUNTING HEIGHT WITH TIME DISPLAY HEIGHT. BLUE D OUTLET FOR TIME DISPLAY X (1) 1"C 4-11/16"SQ. x 2-1/8"D SINGLE-GANG COORDINATE MOUNTING HEIGHT WITH TIME DISPLAY HEIGHT.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:53:59 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM CABLING ROUGH-IN

SCHEDULES
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/19/21
2014226900
T-004

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

WAP WAP
2 1
A
B
D
C

DISPATCH
1 (EXIST)

DRIVER'S
ROOM
20 (EXIST) OPS

MANAGER
3 INTERVIEW
5 (EXIST)

UNIFORM
23 (EXIST)
MENS

RESTROOM
SHOWER
22 (EXIST)

TRAINING
ROOM
30 (EXIST) AV
EQUIP
29 (EXIST)
ELEC
28 (EXIST) MEN
QUIET
25 (EXIST)
WOMAN
QUIET
24 (EXIST)
MENS

RESTROOM
27 (EXIST)
WOMANS

RESTROOM
26 HALLWAY
15 (EXIST)

KITCHEN
21 SUPERVISORS
7 PARA

TRANSIT
4 STANDBY
2 VESTIBULE
3 (EXIST)

COMP SRV

DATA COM
70 NIC
(D)
(D)
(D)
(D)
(D) (D)
(D) (D) (D)
(D)
(D) (D) (D)
(D)
(E) (E)

GENERAL DEMOLITION NOTES

1. CONTACTOR TO FIELD VERIFY EXACT LOCATION AND QUANTI TY OF ALL EXISTING DATA OUTLETS WITHIN AREA OF WORK. D EMOLISH ALL

ASSOCIATED TELECOMMUNICATION PROVISIONS INCLUDING B UT NOT LIMITED TO THE OUTLETS, CABLING, AND PATHWAYS BACK TO THE SOURCE.

2. CONTACTOR TO REMOVE ALL LOW VOLTAGE DEVICES INCLUDI NG NOT

LIMITED TO SECURITY CAMERA, CARD READERS, AND SPEAK ERS AFFECTED

DURING DEMOLITION AND REINSTALL AFFECTED DEVICES BA CK TO THE SAME LOCATION.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:54:34 PM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM DEMOLITION PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/19/21
2014226900
TD-101
1/8" = 1'-0" TD-101
1 TELECOM DEMOLITION FLOOR PLAN

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
IC
35E
SL
35L IC
35E
ST
IC
35E
ST
24 TC 30 TC
24TC 24 TC 30 TC
24TC 24 TC 30 TC
24TC
7045-500
BBF
C1R C1R C1L C1L
722 8 B AS E B AR
4272
24 35X24T 35X30T
M-HALRECR 35X24T BIF
30EPS
7 2 2 8 B A S E B A R
4 2 7 2
WAP
WAP

WAP WAP

M P X M - P F C S T M A X
M P X M - P F X C - 3 5 E M A X
M P X M - P F X C - S M A X M P X M - P F C 3 5 P T N M A X M P X M - P F C S T M A X M P X M - P F X C - 3 5 E M A X

M P X M - P F X C - S M A X
M P X M - P F C 3 5 P L N M A X M P X M - P F C S L M A X M P X M - P F X C - 3 5 E M A X

M P X M - P F X C - S M A X
M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M P X M - P F X T C 2 4 M A X
M P X M - P F X T C 3 0 M A X M P X M - P F X T C 2 4 M A X M S R M - L F W T 1 8 4 2 E M A X
M W T M - U R W 2 4 5 4 M A X
M W T M - U R W 2 4 5 4 M A X
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
K L 1 K 8 2 L 1 P B S F B K I M
M P X M - A C C R A I L 3 0 M A X M P X M - A C C R A I L 3 0 M A X M P X M - A C C R A I L 2 4 M A X M P X M - A C C R A I L 2 4 M A X M S R M - L F 3 4 2 - A M A X
M S R M - L F 5 4 2 - A M A X
M S R M - L F 5 4 2 - A M A X
M S R M - I C P M 2 7 1 5 2 4 B B F L M A X
M T B M - M X H A W 2 4 5 4 M A X

M T B M - H A L R E C R M A X
M T B M - H A R E C 3 S 2 L C F M A X
M W T M - C 1 L M A X
M W T M - C 1 R M A X
M W T M - C 1 R M A X
M P X M - E P F 2 M A X
M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E H 3 0 M A X M P X M - E H 2 4 M A X M P X M - E P S 2 4 M A X
N L 2 1 5 N 4 2 7 2 W G L K N O F
N L 1 N 8 3 G M 4 L M N O F
N L 1 N 8 3 G M 4 L M N O F
M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X
M P X M - P F X M - 3 5 3 0 F P M A X M P X M - P F X M - 3 5 2 4 F P M A X M S U M - D X L O H 1 4 6 0 D M A X
M S U M - D X L S L F 2 3 0 M A X
M S U M - D X L E P 3 0 M A X
M W T M - U R W 2 4 6 0 M A X
M T B M - M X H A W 3 0 8 4 S M A X
N L 2 1 5 N 4 2 7 2 W G L K N O F
4 2 7 2
7 2 2 8 B A S E B A R
30EPS
BIF
30 24 30 24
35X24T M-HALRECR
35X30T 35X24T
30 24
24 4272
722 8 B AS E B AR
C1L C1L C1R C1R
BBF
7045-500
24TC 30 TC 24 TC
24TC 30 TC 24 TC
24TC 30 TC 24 TC
ST
35E
IC 35T
ST
35E
IC
35L
SL
35E
IC
2 1
NIC

DISPATCH
1 VESTIBULE
3 HALLWAY
15 STANDBY
2 PARA

TRANSIT
4 DISPATCH
1 INTERVIEW
5 SUPERVISORS
7 B
C C
A
P2
DS1
B
(EXIST)

COMP SRV

DATA COM
70 T-401
1 A
B
D
C
C
DS2
ET03
(TYP.)
P1
A
ET05
(E) (E)
A
ET13
ET13
ET13 AV1
AV2
AV3
T-501
31 T-501
3 AV4
AV2
AV4
P1
D
D
A
CAV2
T-501
3 +84"
+60"
D
+108"
+108"
ET13
ET18
2 GENERAL NOTES

1. ALL NEW CABLES TO BE CATEGORY 6A.

2. ALL NEW CABLE TO ROUTE BACK TO EXISTING IT ROOM 70.

3. COORDINATE ALL OUTLET LOCATION FOR EQUIPMENT WITH A RCHITECT AND MANUFACTURER PRIOR TO THE COMMENCEMENT OF WORK.

4. COORDINATE ALL WIRELESS ACCESS POINT WITH THE OWNER WIFI ASESSMENT PRIOR RO THE COMMENCEMENT OF WORK.

5. COORDINATE CEILING ACCESS THROUGH AREAS OUTSIDE OF WORK AREA.

COORDINATE PATCHING OF FINISHES, IF REQUIRED WITH A RCHITECTURAL.

6. RE -LABLE ALL DATA OUTLETS AND ASSOCIATED DATA JACKS IN ACCORDANCE WITH OWNER REQUIREMENTS.

GENERAL ZONING NOTES
ZONE: ALL CABLES IN THE ZONE ARE TO ROUTE TO THE NEARST T ELECOM ROOM UNLESS OTHERWISE NOTED.

1. WALL PATHWAYS:
a. ALL CABLES ROUTED UP FOR TECHNOLOGY DEVICES ARE TO BE IN CONTINUOUS CONDUIT WITHIN WALL TO ACCESSIBLE CEILIN G SPACE.

UNLESS OTHERWISE NOTED.
b. PROVIDE ALL CONDUIT ENDS WITH BUSHINGS AND SPILL WAYS. c. ALL FIRE RATED WALL PENETRATIONS ARE TO BE FIRES TOPPED.

2. CEILING PATHWAYS (HARD LID CEILING):
a. ROUTE ALL CABLES FOR TECHNOLOGY DEVICES IN CONTI NUOUS CONDUIT. PROVIDE CONDUIT SLEEVE FROM CORRIDOR INTO ROOM.

PROVIDE A PULLBOX INSIDE THE ROOM WITH A CEILING AC CESS PANEL FOR MAINTENANCE. DISTRIBUTE ALL CABLES INSIDE THE R OOM IN CONDUIT FROM THE PULL BOX. J -HOOKS AND CABLE SUPPORTS ARE NOT ALLOWED WHERE THERE IS A HARD LID CEILING.
b. ALL FIRE RATED WALL PENETRATIONS ARE TO BE FIRE STOPPED.

3. CEILING PATHWAYS (ACOUSTICAL CEILING TILES AND OPEN TO STRUCTURE):
a. ROUTE ALL CABLES FOR TECHNOLOGY DEVICES UTILIZIN G J -HOOKS , EXISTING CABLE TRAY, AND CABLE SUPPORTS. MOUNT CABL E SUPPORTS TIGHT TO STRUCTURE UNLESS OTHERWISE NOTED.
b. ALL FIRE RATED WALL PENETRATIONS ARE TO BE FIRES TOPPED.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:54:10 PM
As indicated
2 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM GROUND FLOOR PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/19/21
2014226900
T-101
NONE T-101
1 TELECOM GROUND FLOOR PLAN
# KEY NOTES
ET03 OWNER PROVIDED WIRELESS ACCESS POINT. COORDINATE
INSTALLATION REQUIREMENTS WITH OWNER.

ET05 CONTRACTOR TO ROUTE NEW CABLES WITHIN EXISTING
CABLE TRAY.

ET13 COORDINATE MOUNTING HEIGHT WITH DISPLAY HEIGHT.

ET18 RF OUTLET CONNECT TO RF ANTENNA ON ROOF USING
COAX CABLE. COORDINATE CABLE, RF CONNECTOR, AND
TERMINATION REQUIREMENTS WITH OWNER.
2 Owner Revisions 05/20/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
(EXIST)

COMP SRV

DATA COM
70 T-401 3
ET07
(TYP. OF 9)
ET08
(TYP. OF 6)
Level 1
0' - 0"
Level 1
0' -0"

EXISTING

EQUIPMET

EXISTING

EQUIPMET
2-RMU HORIZONTAL

WIRE MANAGER

EXISTING UPS

EQUIPMET
ET07 ET08
ET09 ET09
(TYP.) (TYP.)
ET10
ET11
(TYP.)
(TYP.)
ET12
(OFE) SWITCH
(OFE) SWITCH
2-RMU HORIZONTAL

WIRE MANAGER
(EXIST)

COMP SRV

DATA COM
70 ET09
(TYP.)
ET12 ET12

GENERAL NOTES

1. COORDINATE CEILING ACCESS THROUGH AREAS OUTSIDE OF WORK AREA.

COORDINATE PATCHING OF FINISHES, IF REQUIRED WITH A RCHITECTURAL.

2. ALL FIRE RATED WALL PENETRATIONS ARE TO BE FIRESTOP PED.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:54:18 PM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM ENLARGED PLAN
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/19/21
2014226900
T-401
1/2" = 1'-0" T-401
1 DATA ROOM 70 - ENLARGED PLAN
1 1/2" = 1'-0" T-401
3 RACK ELEVATION
1/2" = 1'-0" T-401
2 DATA ROOM 70 - LADDER RACK LAYOUT
# KEY NOTES
ET07 EXISTING 2-POST RACK.

ET08 EXISTING VERTICAL WIRE MANAGER.

ET09 EXISTING LADDER RACK.

ET10 PROVIDE 2-RMU 48 PORT COPPER PATCH PANEL FOR
HORIZONTAL DISTRIBUTION.

ET11 OWNER PROVIDED 2-RMU SWITCH.

ET12 PROVIDE (2) 4" CONDUIT SLEEVES FOR HORIZONTAL
DISTRIBUTION.

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
P-03

LABEL DENOTING SEQUENTIAL NUMBER OF THE

PANEL INSTALLED (FIBER OR COPPER) IN THE RACK
OR CABINET. THIS NUMBER WILL MATCH THE

NUMBER ON THE WALL PLATE THAT THE COPPER
RUNS ARE TERMINATED TO.

LABEL DENOTING THE PORT ON THE PATCH PANEL. THIS N UMBER WILL

MATCH THE NUMBER SHOWN ON THE WALL PLATE THAT THIS SPECIFIC COPPER RUN TERMINATES TO. LABELING WILL ALSO INCLU DE THE ROOM NUMBER IN WHICH THE FIBER RUN IS TERMINATED.
001 002 003 004 005 006 008 007
030 031 029 028 027 026 025 032
Level 1
0' -0"
DATA OUTLET WITH (2)
CAT6A AND (1) RG-6 CABLE

HDMI OUTLET
WITH (2) PORTS

HDMI OUTLET
WITH (1) PORT

AT CONSOLE

HDMI OUTLET
WITH (1) PORT
(1) HDMI CABLE
IN 2"C
C / P2 / DS1
SYMBOL:

XX -XXX

WALL MOUNT WITH
(4) CAT 6A CABLE
4 PORT FACEPLATE,

COORDINATE COLOR

WITH ARCHITECT

MACHINE PRINTED LABEL
WITH 1/4" HIGH BLOCK

LETTERING, BLACK TEXT

ON CLEAR BACKGROUND
(COLORED JACK)
1-4-UTP CAT 6A CABLE
WITH RJ45 8 -POSITION
8-CONDUCTOR

CONNECTOR (TYP)
A / P1
SYMBOL:

XX -XXX

WALL MOUNT WITH
(2) CAT 6A CABLE
2 PORT METAL FACEPLATE,

COORDINATE COLOR

WITH ARCHITECT

MACHINE PRINTED LABEL
WITH 1/4" HIGH BLOCK

LETTERING, BLACK TEXT

ON CLEAR BACKGROUND
(COLORED JACK)
1-4-UTP CAT 6A CABLE
WITH RJ45 8 -POSITION
8-CONDUCTOR

CONNECTOR (TYP)
B
SYMBOL:

XX -XXX

WALL MOUNT WITH
(8) CAT 6A CABLE
8 PORT FACEPLATE,

COORDINATE COLOR

WITH ARCHITECT

MACHINE PRINTED LABEL
WITH 1/4" HIGH BLOCK

LETTERING, BLACK TEXT

ON CLEAR BACKGROUND
(COLORED JACK)
1-4-UTP CAT 6A CABLE
WITH RJ45 8 -POSITION
8-CONDUCTOR

CONNECTOR (TYP)
Level 1
0' - 0"
Level 1
0' -0"

HDMI OUTLET
WITH (1) PORTS

HDMI OUTLET
WITH (1) PORT
(1) HDMI CABLE
IN 2"C

DATA OUTLET
WITH (2) CAT6A
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:54:22 PM
As indicated
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM DETAILS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/19/21
2014226900
T-501
12" = 1'-0" T-501
3 COPPER PATCH PANEL LABELING SCHEME
NONE T-501
1 DISPLAYS ELEVATION
NOT TO SCALE T-501
4 TYPICAL STATION OUTLET - WITH FOUR PORTS
NOT TO SCALE T-501
5 TYPICAL STATION OUTLET - WITH TWO PORTS
NOT TO SCALE T-501
6 TYPICAL STATION OUTLET - WITH EIGHT PORTS
NONE T-501
2 DISPLAY ELEVATION

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
NOTES:

1. EC SHALL CLEAN CORE DRILL, ONE SIZE LARGER THAN SLEEVE.

2. EC SHALL PACK VOID BETWEEN SLEEVE AND FLOOR WITH NON-SHRINK, WATER TIGHT, APPROVED FIRE RATED MATERIAL.

3. EC SHALL INSTALL PLASTIC BUSHINGS AT BOTH ENDS.

PIPE CLAMP

WALL SLEEVE
SLEEVE

PLASTIC BUSHING
WALL

PLASTIC BUSHING

FIRE STOP

SERVICE LOOP AS REQUIRED
WALL

TELECOM CONDUIT

PLASTIC

BUSHING LAST SUPPORTED J-HOOK
NOTES:

1. A “SERVICE LOOP” FOR EVERY HORIZONTAL

CABLE SHALL BE STORED IN THE CEILING
ABOVE THE OUTLET. IN CASES WHERE

CABLES ARE ROUTED IN THE CEILING OF THE
FLOOR BELOW (I.E. UNDER OPEN OFFICE

SPACES, CONFERENCE ROOMS), CABLES

SHALL BE STORED IN THE CEILING OF THE

FLOOR BELOW OR PRIOR TO ENTERING
RACEWAY.

2. LOOP LENGTH SHALL BE 15-FT.

3. THE TOTAL LENGTH OF THE HORIZONTAL

CABLE INCLUDING THE LOOP SHALL NOT
EXCEED 295-FT
(90-METERS).

4. THE LOOP SHALL BE PLACED IN THE CEILING
AT THE LAST SUPPORT (E.G.. J-HOOK) BEFORE

THE CABLES ENTER A FISHABLE WALL,

CONDUIT, SURFACE RACEWAY OR
BOX.

5. LOOP RADIUS (MINIMUM) SHALL BE 4X THE

MINIMUM BEND RADIUS FOR THE
CABLE.

SYMBOL:

TOP VIEW

XX -XXX
WAP

SEQUENTIAL NUMBER

FLOOR NUMBER

MACHINE

PRINTED LABEL
WITH 1/4" HIGH
BLOCK
2-PORT SUFACE

MOUNT BOX

SURFACE MOUNT BOX
(2) CAT 6A CABLE.
(COLORED JACK)
1-4-UTP CAT 6A CABLE
WITH RJ45 8 -POSITION
8-CONDUCTOR
CONNECTOR.
4'-0"

TELE-DATA CABLES

CEILING GRID
3/4" CONDUIT

TYPICAL TELE-DATA

LOCATION
DECK
J-HOOKS (TYP.)

FASTENED TO DECK OR
BEAM
NOTES:

CONTRACTOR SHALL INSTALL J-HOOKS VIA

DECK ABOVE THE CILING AND SPACE
J-HOOKS NO MORE THAN 4 FEET APART.

EXISTING CABLE TRAY

CABLE TO ROUTE TO

EXISTING CABLE TRAY

VIA NEW J-HOOK

SUPPORT
2 (2) CATEGORY 6
(2) CATEGORY 6
(1) ORANGE & (1) BROWN JACK

WAP LOCATION W/
CABLES
SYMBOL:

CEILING GRID

CEILING GRID WAP CLIPS

WIRELESS ACCESS POINT
(WAP) TO BE ATTACHED TO

CEILING GRID
2-PORT SURFACE

MOUNT BOX W/
CABLES

OVERHEAD SLAB /

STRUCTURAL MEMBER
WAP
NOTES:

1. ATTACH CABLE J -HOOK TO THREADED ROD.

2. COORDINATE EXACT ROUTING WITH MECHANICAL CONTRACTOR AND DUCTWORK, AND WORK BY OTHER TRADES.

3. PROVIDE 2" OR 4" DIA. LOOP J -HOOKS, AS MANUFACTURED BY ERICO -"CABLE CAT HANGING SYSTEM" OR APPROVED EQUAL.

4. SPACE J -HOOKS @ 48" O.C. W/PLUS OR MINUS 6".

PLAN VIEW

SECTION VIEW

ACCESSIBLE CEILING

CEILING STRUCTURE

SUSPENDED CEILING SUPPORT CLIP
BY ERICO OR EQUIV. APPROVED.

SUSPENDED CEILING BY OTHERS
1/4" THREADED ROD SECURE TO

STRUCTURE TYPICAL
3"
3" MIN. CLEARANCE

CONDUIT TO ACCESSIBLE CEILING SPACE

INSULATED BUSHING

CABLING
4-11/16"x4 -11/16"x2 -1/4" BOX

DRY WAL RING
(1 OR 2 GANG AS REQUIRED)

FACEPLATE OR DEVICE
(1 OR 2 GANG AS REQUIRED)

CABLE LABEL
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:54:26 PM
As indicated
2 Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM DETAILS
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/31/21
2014226900
T-502
NOT TO SCALE T-502
7 SURFACE MOUNTED BOX - WITH 2 PORTS
12" = 1'-0" T-502
2 ABOVE CEILING CABLING DISTRIBUTION
12" = 1'-0" T-502
3 TYPICAL WALL SLEEVE PENETRATION DETAIL
12" = 1'-0" T-502
4 WIRELESS ACCESS POINT MOUNTING DETAIL
6" = 1'-0" T-502
5 J-HOOK ASSEMBLY
1 : 3 T-502
6 FLUSH MOUNTED OUTLET
12" = 1'-0" T-502
1 CABLE SERVICE LOOP DETAIL
2 Owner Revisions 05/20/2022

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION
LEVEL 1

COAX PP
CU PP

EXISTING DATA
ROOM #70

TYPICAL DATA OUTLET NONE TYPICAL

DATA OUTLET
RG -6 CABLE
CAT6A CABLE

GENERAL NOTES

1. COORDINATE CEILING ACCESS THROUGH AREAS OUTSIDE OF WORK AREA.

COORDINATE PATCHING OF FINISHES, IF REQUIRED WITH A RCHITECTURAL.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved
Client/Project

ORIGINAL SHEET - ANSI D
stn_arch_201422690.rvt
Title
Issued/Revision By Appd YYYY.MM.DD
Client/Project Logo Notes
1 2 3 4 5
A
B
C
Permit/Seal Consultant
YYYY.MM.DD Dsgn. Chkd. Dwn.

Revision
Project No. Scale
Drawing No.

PLAN CHECK SUBMITTAL
5/24/2022 3:54:30 PM
12" = 1'-0"
Gardena Transit Administration and
Operations Building - Dispatch Suite
Remodel
The City of Gardena GTrans
13999 S. Western Gardena,CA
<Pick location in Project Information>

TELECOM SINGLE LINE DIAGRAM
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300
Los Angeles, 90017-3007
Tel: (213) 955-9775 • www.stantec.com
Author Checker Designer 07/19/21
2014226900
T-601
NONE T-601
1 TELECOMMUNICATIONS COPPER CABLING RISER DIAGRAM

ISSUE FOR BID

YYYY.MM.DD
2022.07.06

ISSUE FOR BID

NOT FOR CONSTRUCTION

2 A
C
B
1 D

MAIL BOXES

CONFERENCE

SUPERVISORS

DISPATCH

HALLWAY
15 AV EQUIP
29 WOMANS

RESTROOM
26 MEN QUIET
25 WOMAN QUIET
24 UNIFORM
23 MENS

RESTROOM
SHOWER
22 DRIVER'S ROOM
20 STANDBY
2 OPS MANAGER
3 TRAINING
30 ELEC
28 MENS

RESTROOM
27 KITCHEN
21 Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:28 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 00 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20

EXISTING FLOOR PLAN
SCALE
1/8" = 1' -0"
2 A
C
B
1 D

DISPATCH
1 INTERVIEW
5 HALLWAY
15 AV EQUIP
29 WOMANS

RESTROOM
26 MEN QUIET
25 WOMAN QUIET
24 UNIFORM
23 MENS

RESTROOM
SHOWER
22 DRIVER'S ROOM
20 SUPERVISORS
7 MARKUP
6 LOCKERS/

STORAGE

MAIL BOXES

STANDBY
2 VESTIBULE
3 MONITORS

MOUNTED

ON WALL

KITCHENETTE

OPS MANAGER
3 TRAINING
30 ELEC
28 MENS

RESTROOM
27 KITCHEN
21 NEW GLASS

DOOR W/ GLASS

SIDELIGHT

PARA TRANSIT
4 SLIDING
WINDOW
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:32:53 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 01 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20

CONCEPT FLOOR PLAN
SCALE
1/8" = 1' -0"
1 2
3 4
5 6
7 9
8 11
10 DISPATCH
1 INTERVIEW
5 SUPERVISORS
7 MARKUP
6 PARA TRANSIT
4 STANDBY
2 VESTIBULE
3 LOCKERS/

STORAGE

KITCHENETTE

HALLWAY
15 Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:29 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 02 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20

CONCEPT FLOOR PLAN INTERIOR VIEW
LEGEND
SCALE
1/8" = 1' -0"
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:29 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 1Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 1
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:29 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 2Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 2
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:30 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 3Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 3
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:30 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 4Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 4

Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:30 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 5Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 5

Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:30 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 6Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 6

Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:30 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 7Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 7
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 8Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 8
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 9Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 9
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 10 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 10
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 11 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
INTERIOR VIEW 11
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 12 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
OVERALL VIEW 1
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 13 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
OVERALL VIEW 2
Drawing No.

Date

CONCEPT DESIGN - DISPATCH
13999 S. Western Ave. Gardena, CA 90249
2/4/2020 11:13:31 AM
Gardena Transit Administration and Operations Building The City of Gardena GTrans 14 Stantec Project #2014226900
523 West 6th Street Suite 1200 /
Los Angeles, CA 90014-1218
02/04/20
OVERALL VIEW 3
City of Gardena
Gardena City Council Meeting

AGENDA REPORT SUMMARY
Agenda Item No. 18.B
Section: DEPARTMENTAL

ITEMS - TRANSPORTATION
Meeting Date: November 8, 2022

TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE:

Approve Purchase and Installation of Furniture for GTrans Dispatch Remodel from D & R Office Works for $49,331.99
COUNCIL ACTION REQUIRED:

Staff Recommendation: Approve Purchase
RECOMMENDATION AND STAFF SUMMARY:

GTrans is working to reconfigure its Dispatch center to accommodate the new flow of employee work assignments, meeting areas and access points that result from the onset of several new technology projects. In addition to completing the construction of the overall project, the final design calls for new furniture and workspaces. The furniture includes fully outfitting the newly remodeled areas with office furniture including conference tables, tables, chairs, desks, storage containers, in addition to a new area for those Operators working standby assignments. All furniture is designed for durability, comfort and functionality as well as in keeping with the new design of workflow and assignments.

For this purchase, GTrans is able to take advantage of cooperative purchasing agreements through OMNIA Partners Public Sector, a purchasing organization for state and local government, K-12 education, colleges and universities. All contracts available have been competitively solicited and publicly awarded by a government entity serving as the lead agency while utilizing industry best practices and processes. GTrans will purchase all furniture through D & R Office Works, an authorized dealer in good standing. D & R Office Works has provided furniture for several previous GTrans projects, as well as other City of Gardena furniture projects in the past.

Staff respectfully recommends that City Council approve the purchase and installation of furniture for its GTrans Dispatch Remodel (Project JN 512) from D & R Office Works in the amount of $49,331.99.

FINANCIAL IMPACT/COST:

GTrans has available local capital funds set aside for this project and included in the FY23 and FY24 Capital Budgets approved by City Council. There is no impact to the General Fund.

ATTACHMENTS:

D&R Office Works Proposal 1156-R4 updated 9-29-22.pdf

APPROVED:
___________________________________
Clint Osorio, City Manager
Ernie Crespo
City of Gardena-GTrans - ground level
13999 S. Western Ave
Gardena CA 90249
310-965-8801
9/29/2022
1156-R4-updated 9-29-22
Date:

Valid Until:

BILL TO:

Quote No.:

SHIP TO:

PROPOSAL
Karen BraunSalesperson:
11/30/2022
Item Qty. Product Unit Extended
QUOTATION SUBJECT TO CHANGE AFTER 30 DAYS
1 $0.00 $0.001
OMNIA PARTNERS CONTRACT #R191811
1 $0.00 $0.002
$0.00Sub Total:
02 STANDBY
Item Qty. Product Unit Extended

HON HCWPT
15" x 17" Personal Table
3 $218.19 $654.573
$(L1STD)Laminate Grade Options Grd L1 Standard Laminate .LAHSSelect Grade 1 Laminate Finish Handspun Slate
.SSelect Edgeband Color EDGE: Charcoal
$(P1)Paint Grade Options P1 Paint Opts
.P7ASelect Grade 1 Paint Textured Charcoal
KIM K82L1PBSFB
PAIRINGS,LOUNGE,1 SEAT,ARMLESS,PRIVACY ,BOTH SIDES,FULL BACK 5 $2,611.42 $13,057.104
2BACK UPHOLSTERY GRADE GRADE 2
22168BACK UPHOLSTERY PATTERN COLOR SEDONA PEWTER
2SEAT UPHOLSTERY GRADE GRADE 2
22133SEAT UPHOLSTERY PATTERN COLOR SEDONA SASSAFRAS
2INSIDE UPHOLSTERY GRADE GRADE 2
22133INSIDE UPHOLSTERY PATTERN CLR SEDONA SASSAFRAS

Page 1 of 10 ends