Cities Index.
Agenda packet

Gardena City Council
March 24, 2026

Document
Agenda packet
Meeting
March 24, 2026
Body
Gardena City Council
Pages
25
Original file
60.7 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

The City of Gardena intends to retain the services of a Consultant to provide civil engineering services to prepare construction documents (plans, specifications, and estimate) for the 2025 -2026 and 2026 -2027 Local Street Improvement Project. The project will focus on various residential streets within Zone 5 and Zone 6 of the City.

The scope of work for the project consists of the following:

■ Project kickoff meeting and design progress meetings as necessary and design coordination.
■ Accumulation and review of existing plans and other available data. The City will provide as-built plans available.
■ Project survey. Survey sections not to exceed 50’ shall include right-of-way, centerline, lot lines, curb and gutter, cross gutters, surface features, appurtenances, sewer rim/inverts, storm drain rim/inverts, elevations, etc. with sections. The survey will used for design and construction drawings at 1”=40’ scale. Survey work shall include location of street monuments pre-construction and re-establishment post-construction. ■ Street construction documents (evaluate pavement condition, grind and overlay or slurry as necessary). Elevate crown of street and make recommendations for design as necessary.
■ Utility coordination.
■ Removal and replacement of curb, gutter, and sidewalk as necessary. ■ Submit plans at 35%, 65%, 90% and 100%. Submit specifications at 90% and final. ■ Provide on-going support the bidding and construction stages. ■ Preparation of as-built plans after the completion of construction and submit final drawings in CAD and PDF.

Services to be provided by the DMS Consultants, Inc. under this proposal will include the following:

■ Research and data collection
■ Utility coordination
■ Design survey
■ Base mapping
■ Location of removals
■ Improvement plans
■ Project specifications
■ Cost estimates
■ Pre-construction and post-construction corner records ■ Assistance during bidding and construction phases
■ As-built plans

Local Street Improvement Project - JN 553 & JN 571

Page 2 ends

DMS Consultants, Inc. is a California Corporation established in 1994. Our firm provides civil engineering and related services to municipalities, government entities, and private industries throughout Southern California. As a small business, we are committed to personal service, high quality products, close communications, and enduring client relationships. With a staff of registered civil engineers, designers, and surveyors, DMS Consultants, Inc. is uniquely qualified to respond to the diverse needs of our clientele.

DMS Consultants, Inc. is dedicated to technical excellence and high -quality services. A team approach is taken to every project undertaken, with a Project Engineer directing, managing and acting as the central design figure in the work. Our firm strives to maintain a high level of communication with the client and jurisdictional agencies.

We are acutely aware of the value and importance of providing close individual attention to each project and to working within the constraints of time and budget. We also know that the success of our firm rests clearly on the management, competence, and expertise of our professional staff and team.

DMS Consultants, Inc. presently provides on -call civil engineering design services to the City of Fountain Valley, City of Fullerton, City of Gardena, City of Irvine, City of La Mirada, and City of San Dimas.

We fully understand the critical and typically time -sensitive nature of delivering on -call services, and the need to have experienced and committed teams ready to successfully deliver the City’s needs. DMS Consultants, Inc. has the ability to provide services for the City’s various public works and capital improvement projects in the following areas:

■ Roadway Pavement Improvement Plans
■ Potable Water and Sewer Design
■ Water Line Improvements
■ Drainage Facility Improvements
■ Grading Design
■ ADA Compliance Improvements
■ Hydrology Studies
■ Construction Staking
■ Water Quality Management Plan / Strom Water Pollution Prevention Plan ■ Project Specifications and Cost Estimates

DMS Consultants, Inc. also has the capacity to sub-consult for services in the following areas:

■ Median/Parkway Landscape Improvements ■ Traffic Engineering ■ Public Park Facility Improvements ■ Geotechnical Investigations Local Street Improvement Project - JN 553 & JN 571
The most important element in the provision of professional services is the assignment of key personnel.

Quality personnel and an effective management system combine to produce quality service. Accordingly, the following personnel will be assigned to this project.

AVAILABILITY OF STAFF

DMS Consultants, Inc. prides itself in performing the work on a short notice and in a timely manner. We will assign significant staff to complete the work on schedule and to the City’s satisfaction.

Key personnel will be available for the duration of the required services and shall not be removed or replaced without prior written concurrence of the City.

Surender Dewan, PE, QSD/QSP
President/Project Manager
Nishant Chadha, MS, MBA
Design Engineer
Hoang Nguyen, BS
Design Engineer

Page 3 ends

Mindy Ly, PE
Project Engineer
Local Street Improvement Project - JN 553 & JN 571

SUB-CONSULTANT

Digital Mapping Inc.

Photogrammetric Services

Bob Kelsoe, LS.

Survey Party Chief
Survey Crew

Page 4 ends

Bachelor of Science, Civil Engineering
Delhi University, 1970
Master of Science, Civil Engineering
University of Washington, 1978

Civil Engineer, California
RCE 34559
SWRCB Certified QSD 20924

Mr. Dewan, President of DMS Consultants, Inc., has over 35 years of professional experience in the design of Public Works projects. Mr. Dewan is responsible for performing and/or coordinating engineering design and other related technical services including project management; preparation of plans, specifications, estimates, design; preparation of WQMP’s and SWPPP’s; and evaluation of major municipal projects.

MUNICIPAL PROJECTS

▪ Jamboree Road Pavement Rehabilitation - Irvine
▪ FY 24-25 Annual Street Rehabilitation and Slurry Seal - Irvine ▪ Residential Roadway Rehabilitation Quadrant E7 - Fountain Valley ▪ Residential Roadway Rehabilitation Quadrant C3 - Fountain Valley ▪ Local Street Improvement Project, JN 525 - Gardena
▪ Neighborhood Slurry Seal Area 5 - La Mirada
▪ Van Ness Avenue Street Improvement Project - Gardena ▪ 139th Street and Van Ness Avenue Street Improvements - Gardena ▪ Residential Rehabilitation Project - Phase 6A and 6B - La Mirada ▪ Commonwealth Avenue and Raymond Avenue Reconstruction Project - Fullerton ▪ Residential Roadway Rehabilitation Quadrants D2 and D3 - Fountain Valley ▪ Warner Avenue Rehabilitation and Resurfacing Project - Fountain Valley ▪ Local Streets Improvement Project 2020-2022 - Gardena ▪ Concrete Alley and Street Replacement Project - Newport Beach ▪ Alondra Boulevard and Imperial Highway Rehabilitation Project - La Mirada ▪ MacArthur Boulevard Pavement Reconstruction Project - Newport Beach ▪ Marguerite Avenue and Hospital Road Pavement Rehabilitation - Newport Beach ▪ Euclid Street Roadway Improvements - Fountain Valley ▪ Residential Roadway Rehabilitation Quadrants D7, E1 and F1 - Fountain Valley ▪ State College Boulevard Rehabilitation Project - Fullerton ▪ San Dimas Avenue Improvements - San Dimas
▪ Madonna Area Street, Sewer and Water Reconstruction - Fullerton ▪ Via Verde Reconstruction Project from Covina Hills Street to Puente Street - San Dimas ▪ Chapman Avenue Rehabilitation Project from Berkeley Avenue to Raymond Avenue - Fullerton Local Street Improvement Project - JN 553 & JN 571
Project Manager
California State University, Los Angeles
Bachelor of Science - Civil Engineering
Civil Engineer, California
RCE 68290
Prior to joining DMS Consultants, Inc., Ms. Ly worked as a Senior Civil Engineer at the City of Santa Ana. In her capacity as Senior Civil Engineer she planned, designed, and managed over 20 public works projects ranging from street reconstruction, traffic signal design, neighborhood revitalization projects, and recreational park projects. Ms. Ly has experience in local, state, and federal agency coordination including security funding and 409 permits.

Design Engineer
Mr. Chadha has over 15 years of experience in civil engineering working on project for public agencies. Mr. Chadha has been responsible for preparation of street plans, sewer and storm drain improvement plans, grading plans, tract maps, lot line adjustments, legal descriptions, and preparation of corner records. Mr. Chadha is a key figure at DMS Consultants, Inc. in coordinating design and carrying it through to construction drawings.

Design Engineer
Mr. Nguyen has over 30 years of civil engineering experience and has been responsible for preparation of street improvement plans, sewer, water and storm drain improvement plans, grading plans, and tract maps.

Page 5 ends
Page 6 ends

STREET DESIGN

2023-2024 & 2024-2025 Local Streets Improvement Project Gardena
DMS was selected by the City of Gardena to provide civil engineering services for the project JN 525 Local Streets Improvement, Zone 3 and Zone 4. The project area consisted of 8± miles of local and collector streets. The scope of work for the project includes rehabilitation of roadway, removal and replacement of curbs, gutters, cross gutters, and sidewalk, ADA improvements, preparation of project specifications, cost estimates, pre and post construction corner records.

DMS Project Manager: Surender Dewan, PE

FY24-25 Annual Street Rehabilitation and Slurry Seal
Irvine
DMS was selected by the City of Irvine to provide civil engineering services for FY 24-25 Annua Street Rehabilitation and Slurry Seal project. The project consists of Turtle Rock, Quail Hill University Town Center, Rancho San Joaquin,
Woodbury, Laguna Altura, and San Joaquin Marsh
neighborhoods. The scope of work for the project includes evaluating streets to determine resurfacing treatments, identifying areas in need of repair and ramp reconstruction, traffic signage and striping plans, and preparation of plans, spreadsheets, construction details, quantities and estimates.

DMS Project Manager: Surender Dewan, PE

Jamboree Road Pavement Rehabilitation
Irvine
DMS was selected by the City of Irvine to provide civil engineering services for Jamboree Road Pavement
Rehabilitation project. The project area is Jamboree Road from Main Street to Campus Driver. The project includes street improvement plans, construction details, traffic signal plans, cost estimate, and Caltrans encroachment permit approval.

DMS Project Manager: Surender Dewan, PE
Agency & Contact:

City of Gardena
Kevin Kwak, PE
Assistant Public Works Director
310.217.9643
[email protected]
Construction Cost:
$2.7 million
Project Dates:

Design: 2023
Construction: 2025

Agency & Contact:

City of Irvine
Allison Tran, PE
Senior Civil Engineer
949-724-7547
[email protected]
Construction Cost:
$13 million
Project Dates:

Design: Active
Construction: Pending

Agency & Contact:

City of Irvine
Allison Tran, PE
Senior Civil Engineer
949-724-7547
[email protected]
Construction Cost:
$7.1 million
Project Dates:

Design: Active
Construction: Pending

Local Street Improvement Project - JN 553 & JN 571

Page 7 ends

STREET DESIGN

Deerfield Avenue and Hearthstone Pavement Rehabilitation Irvine
DMS was selected by the City of Irvine to provide civil engineering services for Deerfield Avenue from Culver Drive to Harvard Avenue and Hearthstone from Irvine Center Drive to Deerfield Avenue Pavement Rehabilitation project. The scope of work for the project included roadway improvements, street resurfacing, removal and reconstruction of damaged curb and gutter, sidewalk and ADA accessible ramps, preparation of striping and signage plans, project specifications, and cost estimates.

DMS Project Manager: Surender Dewan, PE

Ellis Avenue Rehabilitation and Resurfacing
Fountain Valley
DMS was selected by the City of Fountain Valley to provide civil engineering design services for Ellis Avenue Rehabilitation and Resurfacing Project. The project area is Ellis Avenue from Brookhurst Street to Bushard Street. The scope of work for the project includes utility coordination, design survey,
reconstruction of roadway, reconstruction of median curb, curb and gutter, sidewalk, ADA improvements, striping and signage plans, project specifications, and cost estimates.

DMS Project Manager: Surender Dewan, PE

Warner Avenue Rehabilitation and Resurfacing
Fountain Valley
DMS was selected by the City of Fountain Valley to provide civil engineering design services for Warner Avenue Rehabilitation and Resurfacing Project. The project area is Warner Avenue from Brookhurst Street to Bushard Street. The scope of work for the project includes utility coordination, design survey, reconstruction of roadway, reconstruction of median curb, curb and gutter, sidewalk, ADA improvements, striping and signage plans, project specifications, and cost estimates.

DMS Project Manager: Surender Dewan, PE
Agency & Contact:

City of Irvine
Allison Tran, PE
Senior Civil Engineer
949-724-7547
[email protected]
Construction Cost:
$1.3 million
Project Dates:

Design: 2025
Construction: Active

Agency & Contact:

City of Fountain Valley
Kyle Knoke, PE
Assistant Engineer
714.593.4678
[email protected]
Construction Cost:
$1.4 million
Project Dates:

Design: 2023
Construction: 2025

Agency & Contact:

City of Fountain Valley
Kyle Knoke, PE
Assistant Engineer
714.593.4678
[email protected]
Construction Cost:
$1.6 million
Project Dates:

Design: 2023
Construction: 2025

Local Street Improvement Project - JN 553 & JN 571

Page 8 ends

STREET DESIGN

Residential Rehabilitation Project Phase 6A & 6B
La Mirada
DMS was selected by the City of La Mirada to provide civil engineering services for Phase 6 - Residential Street
Rehabilitation project. The project consists of 16± miles of residential streets. The scope of work for the project included roadway improvements, street resurfacing, storm drain
construction and appurtenant infrastructure repairs, preparation of project specifications, cost estimates, and monument preservation.

DMS Project Manager: Surender Dewan, PE

Via Verde Street Improvements
San Dimas
DMS was selected by the City of San Dimas to provide civil engineering services for Via Verde Street Improvements. The project limits are form 1400’ west of Covina Hills Road to Easterly City Limits. The project includes rehabilitation of existing roadway, removal and reconstruction of damaged curb and gutter, sidewalk and ADA accessible ramps, preparation of striping and signage plans, project specifications, and cost estimates.

DMS Project Manager: Surender Dewan, PE

Local Streets Improvement Project 2020-2022
Gardena
DMS was selected by the City of Gardena to provide civil engineering services for the Local Streets Improvement Project.

The project area is 8± miles of local and collector streets. The project includes rehabilitation of roadway, removal and replacement of curbs, gutters, cross gutters, and sidewalk, ADA improvements, project specifications, and cost estimates.

DMS Project Manager: Surender Dewan, PE

Agency & Contact:

City of La Mirada
Eric Villagracia
Project Manager
562.902.2373
[email protected]
Construction Cost:
$8.2 million
Project Dates:

Design: 2020
Construction: 2022

Agency & Contact:

City of San Dimas
Shari Garwick, PE
Director of Public Works
909.644.3344
[email protected]
Construction Cost:
$3 million
Project Dates:

Design: 2022
Construction: 2023

Agency & Contact:

City of Gardena
Kevin Kwak, PE
Principal Engineer
310.217.9643
[email protected]
Construction Cost:
$2.7 million
Project Dates:

Design: 2021
Construction: 2023

Local Street Improvement Project - JN 553 & JN 571
The RFP indicates that the City of Gardena has a total budget of $4.6 million for the project which includes design, construction, and construction management. Allowing for design, construction management, and contingencies in our opinion, leaves an amount of $3.3 million for street rehabilitation.

A PMP Report prepared by the City provides the PCI classification for local and collector streets in the City as follows.

The streets proposed for rehabilitation for both Zone 5 and Zone 6 as indicated in the RFP have a PCI range of 42 and above. The streets to be rehabilitated are listed below.

Page 9 ends

PCI CLASSIFICATION

CATEGORY VERY POOR POOR FAIR VERY GOOD EXCELLENT
PCI Range 0-24 25-49 50-69 70-89 90-100
ZONE 5
Name From To Length Width Area PCI
AC Grind-Overlay
160th ST NORMANDIE AVE BUDLONG AVE 1,021 33 33,693 52
163rd ST BUDLONG AVE NEW HAMPSHIRE AVE 940 37 34,780 43 163rd ST
(PPC REPAIR) NEW HAMPSHIRE AVE VERMONT AVE 251 36 9,036 47 HOBART BLVD 162nd ST END 150 30 4,500 48

NEW HAMPSHIRE AVE
(PPC REPAIR) 163rd ST 164th ST 330 44 14,520 49
ST. ANDREWS PL 161st ST 162nd ST 305 35 11,575 42
158th ST BUDLONG AVE END 572 33 18,876 62
161st ST GRAMERCY PL ST. ANDREWS PL 473 34 16,082 66
166th ST NORMANDIE AVE BERENDO AVE 1,899 16 30,834 56
166th ST BERENDO AVE NORMANDIE AVE 1,899 16 33,634 59
GRAMERCY PL 162nd ST 166th ST 1,195 34 40,630 58
MANHATTAN PL REDONDO BEACH BLVD 162nd ST 1,499 32 47,968 65 Type II Slurry Seal
159th ST NORMANDIE AVE BUDLONG AVE 1,021 33 33,693 66
DALTON AVE 162nd ST 166th ST 1,195 36 43,020 65
NEW HAMPSHIRE AVE RAILROAD 167th ST 185 44 8,140 64

Local Street Improvement Project - JN 553 & JN 571

Page 10 ends

ZONE 6
Name From To Length Width Area PCI
AC Grind-Overlay
171st ST HALLDALE AVE BRIGHTON WAY 747 33 24,651 62
172nd ST HALLDALE AVE BRIGHTON WAY 821 32 26,272 43
173rd ST DALTON AVE BRIGHTON WAY 1,345 32 43,040 47
BERENDO AVE CASSIDY ST END 224 28 6,272 61
BRIGHTON WAY 170th ST 173rd ST 772 33 25,476 43
BUDLONG AVE 177th ST (NB ONLY) 182nd ST 1,425 20 28,500 57 CATALINA AVE 168th ST END 650 34 22,100 60
DALTON AVE 166th ST 170th ST 1,245 34 42,330 56
DENKER AVE 166th ST 169th PL 950 34 32,300 78
HALLDALE AVE 166th ST 168th ST 290 34 9,860 78
HARVARD BLVD 180th ST 182nd ST 635 34 21,590 51
HOBART BLVD 166th ST 169th PL 947 34 32,198 76
HOBART BLVD 178th ST 180th ST 590 34 20,060 53
HOBART BLVD 180th ST 182nd ST 635 34 21,590 33
LA SALLE AVE 180th ST 182nd ST 635 34 21,590 35
MARIPOSA AVE 168th ST 170th ST 800 32 25,600 58
SOUTH PARK LN 170th ST END 946 23 21,758 61
Type II Slurry Seal
168th ST WESTERN AVE DENKER AVE 1,246 33 41,118 83
169th PL MARIPOSA AVE END 448 32 14,336 70
179th PL DENKER AVE END 498 34 16,932 73
180th ST EVELYN AVE BRIGHTON 782 34 26,588 86
AVERY PL 180th ST END - SOUTH 180 32 7,525 84
BERENDO AVE FELDER ST END 160 30 4,800 84
BROADWELL AVE CASSIDY ST END 120 44 5,280 85
BUDLONG AVE CASSIDY ST END 224 28 6,272 73
CURT PL 180th ST END - NORTH 180 32 7,260 82
DALTON AVE 180th ST END 370 34 12,580 76
DALTON PL 180th ST END 300 34 10,200 73
DENKER AVE 178th ST 182nd ST 1,245 34 42,330 68

Local Street Improvement Project - JN 553 & JN 571

DMS Consultants, Inc. proposes to use high resolution orthophotos to prepare plans. These photos are in CAD format and will be prepared and flown for this specific project.

Mr. Espinoza has indicated that City’s emphasis on the project is rehabilitation of existing pavement i.e., slurry seal and grind and overlay. Concrete improvements will be limited and confined only to grind and overlay streets, if feasible within allocated budget.

In our experience on past similar projects for the City of Gardena, the criteria for concrete improvements has been as follows:

■ Curb and Gutter:

Major cracks and ponding
■ Sidewalk:

Trip hazard and broken sidewalk
(sidewalk reconstruction behind driveways will be 6” thick) ■ Cross Gutter:

Extensive cracks and ponding
■ Curb Ramps:

Non-conforming to ADA standards of accessibility

Page 11 ends

Local Street Improvement Project - JN 553 & JN 571
ZONE 6
Name From To Length Width Area PCI
Type II Slurry Seal
ELECTRIC ST VERMONT AVE END - WEST 2,622 10 26,220 67
HARVARD BLVD 168th ST 169th PL 573 26 14,898 75
HARVARD BLVD 178th ST 180th ST 590 34 20,060 67
LA SALLE AVE 168th ST 169th PL 573 34 19,482 72
LA SALLE AVE 178th ST 180th ST 590 34 20,060 72
MAYFLOWER CR 168th ST END 500 36 18,000 86
RAYMOND PL 170th ST END 722 34 24,548 73
STEVENS ST 170th ST END 622 32 19,904 84
AC Grind and Overlay - Zone 5
The streets in Zone 5 vary in width from 16 to 44 feet with parking permitted on both sides of the street with parkway and concrete curb on both sides. 166th Street from Normandie Avenue to Berendo Avenue in the project area is a collector street and has a raised median divider in the center with railroad tracks in the center median. (Figure 1) Our research of existing maps at Los Angeles County Surveyor’s Office indicates the railroad right -of-way to be 40 feet wide. Proposed improvements in/or adjacent to U.P.R.R. right-of-way will require processing a permit through U.P.R.R.

For streets in this zone the concrete curb and gutter is in relatively good condition with an exception of a few locations where we observed ponding and damaged curb and gutter. (Figure 2) There are a few locations within the project area with damaged sidewalk and trip hazards. We also noticed some driveways in the project area which may require reconstruction, in case the City decides otherwise, the walkway behind the driveways will be constructed to a thickness of 6-inches. (Figure 3)

Page 12 ends

Local Street Improvement Project - JN 553 & JN 571
Figure 2
Figure 1
Figure 3
The curb ramps at the following locations do not conform to ADA standards of accessibility. Some of these ramps can be brought to conformance by installing truncated domes.

The existing cross gutters in the project area appear to be relatively good and only a few will require reconstruction.

163rd Street from New Hampshire Avenue to Vermont Avenue and New Hampshire Avenue from 163rd Street to 164th Street are concrete streets 36 – 44 feet wide from curb to curb with parkway and sidewalk on both sides of the streets. (Figure 4) The proposed treatment for this roadway will consist of edge grind and AC overlay of variable thickness to allow for a minimum 2% cross slope. The existing alley approach at New Hampshire Avenue between 164th Street and 163rd Street will require reconstruction. (Figure 5)

Page 13 ends

CURB RAMPS - ZONE 5
160th STREET/ NORMANDIE AVENUE N.E. & S.E. CORNERS
160th STREET/ BUDLONG AVENUE N.W. & S.W. CORNERS
163rd STREET/ BUDLONG AVENUE ALL 4 CORNERS
163rd STREET/ BERENDO AVENUE ALL 4 CORNERS
163rd STREET/ NEW HAMPSHIRE AVENUE S.E. & S.W. CORNERS
NEW HAMPSHIRE AVENUE/ 164th STREET ALL 4 CORNERS
158th STREET/ BUDLONG AVENUE N.E. & S.E. CORNERS
MANHATTAN PLACE/ REDONDO BEACH BOULEVARD S.E. & S.W. CORNERS MANHATTAN PLACE/ 162nd STREET N.E. CORNER
166th STREET/ NORMANDIE AVENUE ALL 4 CORNERS
DALTON AVENUE/ 166th STREET N.E. & N.W. CORNERS
GRAMERCY PLACE/ 166th STREET N.W. CORNER
GRAMERCY PLACE/ 162nd STREET S.E. & S.W. CORNERS
Local Street Improvement Project - JN 553 & JN 571
Figure 4 Figure 5
AC Grind and Overlay - Zone 6
The streets in Zone 6 vary in width 20 to 44 feet, similar to the streets in Zone 5 with parking permitted on both sides of the street with curb and gutter and parkway on both sides. Concrete sidewalk, curb and gutter are in relative good condition with the exception of a few locations where we observed ponding and damaged curb. (Figure 6) We also noticed damaged sidewalk and trip hazards at a few locations. (Figure 7)

Proposed improvements in/or
adjacent to the U.P.R.R. right -
of-way will require processing
through U.P.R.R. (Figure 8)
The following locations have
railroad crossings.

▪ Dalton Avenue from 166th
Street to 170th Street
▪ Halldale Avenue from
166th Street to 168th Street
▪ Denker Avenue from 166th
Street to 169th Place
▪ Hobart Boulevard from
166th Street to 169th

Page 14 ends

Figure 6 Figure 7
Figure 8
Local Street Improvement Project - JN 553 & JN 571
The curb ramps at the following locations do not conform to ADA standards of accessibility.

Some of these ramps can be brought to
conformance by installing truncated
domes. (Figure 9)

The existing cross gutters in the project
area appear to be relatively good
condition and only a few will require
reconstruction.

Below is the typical section for streets
designated for AC grind and overlay.
(Figure 10)

Page 15 ends

CURB RAMPS - ZONE 6
BUDLONG AVENUE/ 177th STREET S.E. & S.W. CORNERS
BUDLONG AVENUE/ 182nd STREET N.E. CORNER
CATALINA AVENUE/ 168th STREET S.E. & S.W. CORNERS
DALTON AVENUE/ 169th STREET ALL 4 CORNERS
HALLDALE AVENUE/ 166TH STREET S.W. CORNER
HARVARD BOULEVARD/ 182nd STREET N.E. & N.W. CORNERS
HOBART BOULEVARD/ 178th STREET S.E. & S.W. CORNERS
HOBART BOULEVARD/ 182nd STREET N.E. & N.W. CORNERS
LA SELLE AVENUE/ 182nd STREET N.E. & N.W. CORNERS
MARIPOSA AVENUE/ 168th STREET S.E. & S.W. CORNERS
Figure 9
Figure 10
Type II Slurry Seal Streets - Zone 5 and Zone 6
Mr. Espinoza has indicated that for this project it is the City’s intent to keep concrete improvements in the streets receiving slurry seal to a minimum, which consists of curb and gutter with major ponding.

For these streets we will identify if any, sections of pavement failures caused by tree roots, distressed pavement and identifying on the plans for reconstruction by home addresses.

Additionally, during field review in consultation with City staff, if it is determined that some sections of streets need to be rehabilitated with grind and overlay and not slurry seal, we will prepare plans accordingly.

Below is the typical section for streets designated for slurry seal. (Figure 11)

Page 16 ends

Local Street Improvement Project - JN 553 & JN 571
Figure 11
Concrete Repairs
163rd Street from New Hampshire Avenue to Vermont Avenue and New Hampshire Avenue from 163rd Street to 164th Street are concrete streets and show very long and wide cracks at various locations. The cracks on these streets will be crack sealed and self -adhering pavement membrane placed prior to AC overlay. (Figure 12) Below is the typical section for concrete repair streets. (Figure 13)

Page 17 ends

Local Street Improvement Project - JN 553 & JN 571
Figure 12
Figure 13
Design Survey
Since this is a grind and overlay project we will perform street cross sections as required, at least two cross sections per street for streets with AC grind and overlay to ensure that the streets have required minimum cross slope of 2% or the cross slope does not exceed 5%.

We will also perform field survey for non -conforming curb ramps as required, for detailed design. In our proposal we have assumed at total of 10 such locations.

During our field visit of Zone 5 and Zone 6, we have identified a total of 25 cross gutters. In our proposal we have assumed that 8 of them may exhibit ponding or cracks and will require reconstruction, and as such will require design survey.

Pre and Post Corner Records
We will research on the County of Los Angeles website and City tie notes to obtain the existing corner records for grind and overlay streets. For the purpose of this proposal we assumed a total of 20 intersections requiring pre and post construction records. We will prepare and file pre and post construction corner records for these locations.

Project Budget
The RFP indicates that the City of Gardena has budgeted $4.6 million for the proposed project improvements which includes design, CMI, construction, and contingency.

Based on past experience for projects similar in nature in the City of Gardena and other cities, we have prepared a preliminary cost estimate for the project. We have broken down the estimate for Zone 5 and Zone 6 separately.

As per our estimate, located on the following page, we feel comfortable that all streets indicated in the RFP including concrete improvements in grind and overlay streets can be completed within the allocated budget of 4.6 million dollars.

Page 18 ends

Local Street Improvement Project - JN 553 & JN 571

Page 19 ends

PRELIMINARY ESTIMATE ZONE 5

ITEM UNIT PRICE AMOUNT QUANTITY
Traffic control 1 LS $100,000 $100,000.00
Coldmill 0” -1.5” thick AC 275,000 SF $0.50 $137,500.00 Repair all holes, spalls, joints and crack seal pavement 1 LS $40,000 $40,000.00 Furnish and install ARHM overlay 1,925 TON $175 $437,500.00 Remove and reconstruct variable depth AC pavement 60 TON $175 $10,500.00 Furnish and install Type 2 slurry 493,988 SF $0.30 $25,500.00 * Remove and reconstruct PCC curb and gutter over 6” CAB 1,500 LF $85 $85,000.00 * Remove and reconstruct sidewalk - 4” thick 3,000 SF $15 $30,000.00 * Remove and reconstruct sidewalk - 6” thick 1,000 SF $18 $10,800.00 * Remove and reconstruct PCC cross gutter 3,500 SF $25 $37,500.00 * Remove and reconstruct curb ramp per Caltrans Std. A88A 11 EA $7,500 $112,500.00 * Adjust access openings to grade 30 EA $800 $32,000.00 Asphalt tracking prevention and mitigation 1 LS $10,000 $10,000.00 Furnish and install traffic striping 1 LS $50,000 $50,000.00 * Estimate/assumed Subtotal: $1,118,800.00
Contingencies at 25% (includes design & CMI): $279,700.00 Total: $1,398,500.00
PRELIMINARY ESTIMATE ZONE 6

ITEM QUANTITY UNIT PRICE AMOUNT
Traffic control 1 LS $100,000 $100,000.00
Coldmill 0” -1.5” thick AC 435,000 SF $0.50 $217,500.00 Repair all holes, spalls, joints and crack seal pavement 1 LS $40,000 $40,000.00 Furnish and install ARHM overlay 3,900 TON $175 $682,500.00 Remove and reconstruct variable depth AC pavement 60 TON $175 $10,500.00 Furnish and install Type 2 slurry 430,000 SF $0.30 $129,000.00 * Remove and reconstruct PCC curb and gutter over 6” CAB 1,500 LF $85 $127,500.00 * Remove and reconstruct sidewalk - 4” thick 3,000 SF $15 $45,000.00 * Remove and reconstruct sidewalk - 6” thick 1,000 SF $18 $18,000.00 * Remove and reconstruct PCC cross gutter 2,000 SF $25 $50,000.00 * Remove and reconstruct curb ramp per Caltrans Std. A88A 16 EA $7,500 $120,000.00 * Adjust access openings to grade 50 EA $800 $40,000.00 Asphalt tracking prevention and mitigation 1 LS $10,000 $20,000.00 Furnish and install traffic striping 1 LS $50,000 $50,000.00 * Estimate/assumed Subtotal: $1,650,000.00
Contingencies at 25% (includes design & CMI): $412,500.00 Total: $2,062,500.00
TOTAL CONSTRUCTION COST INCLUDING DESIGN, CMI AND CONTINGENCIES: $3,461,000.00 Local Street Improvement Project - JN 553 & JN 571
TASK 1: PRELIMINARY PHASE - 35% SUBMITTAL
Design Review Meeting
▪ In a consultation meeting with the City, the scope of work, procedure and precise limits of the project improvements will be reviewed.
▪ Obtain from the City address maps for the project area.

Utility Coordination
▪ Submit a project schedule to utility companies and request notification of any planned projects within project area to identify potential work that can be performed prior to start of project to minimize trenching within the newly rehabilitated streets.

Field Review / Locate Removals
▪ Perform aerial survey for orthophotos and prepare base sheets for grind and overlay at 1”=40’ scale and 1”=80’ scale for slurry seal. For New Hampshire Avenue from 164th Street to Vermont Avenue, prepare base sheets at 1”=20’ scale.
▪ Perform field survey and locate all existing manholes, cleanouts, water valves and all other utilities. ▪ Identify portion of roadway requiring full depth rehabilitation. ▪ Identify curb and gutter, sidewalk, cross gutters, and curb ramps to be reconstructed. ▪ Identify existing trees to be removed and replaced.
▪ Prepare an inventory of all existing striping and signage, including non-conforming regulatory signs.

Design Survey
▪ Perform street cross sections as required, at least two cross sections per street for streets with AC grind and overlay to ensure that the streets have required minimum cross slope or the cross slope does not exceed 5%.
▪ Perform topographic survey for non -conforming curb ramps as required for detailed design. In our proposal we have assumed at total of ten (10) such locations. ▪ During our field visit of Zone 5 and Zone 6, we have identified a total of twenty -five (25) cross gutters. In our proposal we have assumed that eight (8) of them may exhibit ponding or cracks and will require reconstruction.
▪ Perform detailed survey for New Hampshire Avenue and 163rd Street intersection. During our field visit we noticed major drainage issues at this intersection. Proposed solution will be to construct cross gutters (north-south) across the intersection.

Deliverables: Meet and review with City removals and street rehabilitation treatment identified at 35% Submittal

Page 20 ends

TASK 2: PLANS, SPECIFICATIONS AND ESTIMATE
Preliminary Design - 65% Submittal
▪ Prepare preliminary street improvement plans at 1”=40’ scale for grind and overlay, 1”=80’ for slurry seal, and 1”=20’ for New Hampshire Avenue from 164th Street to Vermont Avenue. ▪ Plot home addresses on base maps.
▪ Prepare preliminary improvement plans. Plans to identify:
▫ Limits of slurry seal
▫ Limits of cold mill and overlay
▫ Location of curb and gutter, and sidewalk to be reconstructed by addresses. ▫ Location of cross gutters to be reconstructed.
▫ Location of tree removals by addresses.
▫ Portions of street reconstruction, dig outs (if any). ▫ Installation of curb ramps with type and case per Caltrans standards ▫ Adjustment of utility valves and manholes
▫ Striping and signage
▪ Prepare necessary plans and permit application for U.P.R.R. crossing on 166th Street and Dalton Avenue and submit to U.P.R.R.
▪ Prepare preliminary project specifications and cost estimate.

Deliverables: 65% Design - Plans
65% Design - Specifications and Estimate

Design Phase - 90% Submittal
▪ Prepare final street improvement plans. Final plans to include:
▪ Title sheet will include:
▫ Project title, vicinity and location map, plan sheet index and scale. ▫ Utility and plan legends, utility notes, contact names and telephone numbers. ▫ Standard signature and title blocks.
▪ Plan sheets will include:
▫ Topography between right-of-way and beyond as necessary. ▫ Right-of-way limit lines.
▫ Construction notes and quantity estimates.
▫ Typical sections and details.
▪ Finalize U.P.R.R. permit package.
▪ Prepare final project specifications and cost estimate.

Deliverables: 90% Design - Plans
90% Design - Specifications and Estimate

Page 21 ends

Design Phase - 100% Submittal
After approval of design, submit final plans in CAD and PDF, project specifications and estimate to the City.

Deliverables: 100% Design - Final Plans
100% Design - Final Specifications and Estimate

TASK 3: MONUMENT PRESERVATION
Locate all existing ties and monuments per tie notes provided by City.

Set new ties outside the curb return of the existing ties are located in the curb return, since these ties will be disturbed during construction of curb ramps.

Provide City with recorded copies of pre-construction corner records.

Set centerline monuments upon completion of construction.

Provide City with recorded copies of post construction corner records.

TASK 4: CONSTRUCTION SUPPORT SERVICES
▪ Provide coordination during bidding process, including answering bidders questions. ▪ Prepare “As-Built” plans based on information provided by City.

Page 22 ends
Page 23 ends

2025-2026 & 2026-2027
Local Street Improvement Project - JN 553 and JN 571
Task Description
April May June July August September
6 13 20 27 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 7 14 Design Review Meeting
Aerial Survey
Utility Coordination
U.P.R.R. Permit Package
Field Review and
Locate Removals

Design Survey
Design Phase
65% Submittal

City’s Review of Plans
Design Phase
90% Submittal

City’s Review of Plans
Final Design
100% Submittal

▲
Corner Records

April 6, 2026 ▲ September 14, 2026
Notice to Proceed Design Complete

Page 24 ends

2025-2026 & 2026-2027
Local Street Improvement Project - JN 553 and JN 571

Task Description Project
Manager
Project
Engineer
Design
Engineer
Survey
Crew Total
Preliminary Design Phase - 35% Submittal
Design survey 4 63 67
- Curb ramps - 10 assumed 1 15
- Cross gutters - 8 assumed 1 16
- Street cross section to confirm cross slope 1 24
- New Hampshire Avenue topo 1 8
Field review 24 60 84
Utility coordination 4 2 6
Plans, Specifications and Estimate
Preliminary Design - 65% Submittal
Base sheets 10 32 120 162
Improvement plans 10 40 120 170
Cross gutter/curb ramp details 2 12 24 38
U.P.R.R. permit package 4 8 12 24
Project specifications 16 8 24
Cost estimate 6 8 10 24
Final Design - 90% & 100% Submittal
Improvement plans 10 28 40 78
Finalize U.P.R.R. permit package 8 10 8 26
Project specifications 6 4 10
Cost estimate 6 8 14
Monument Preservation
Pre and post construction corner records
20 pre / 20 post assumed 60 60 120
Construction Support
Bidding and construction phase assistance 10 10
As-built plans 2 12 14
TOTAL HOURS 84 174 484 123 871
Local Street Improvement Project - JN 553 & JN 571

Page 25 ends

2025-2026 & 2026-2027
Local Street Improvement Project - JN 525 and JN 571

Task 1: Preliminary Phase - 35% .................................................... $35,740.00

1. Aerial survey and orthophotos - subconsultant +10% .......................................... $7,700.00

2. Design survey. ................................................................................................... $15,640.00 - Cross gutters - 8 assumed
- Curb ramps - 10 assumed
- Street cross sections
- New Hampshire Avenue topo

3. Field review. ....................................................................................................... $11,520.00

4. Utility coordination. .................................................................................................. $880.00 Task 2: Plans, Specifications and Estimate ..................................... $84,380.00

5. Preliminary Design - 65% ................................................................................... $64,240.00 - Base sheets
- Improvement plans
- Detail sheet - cross gutter and curb ramp
- U.P.R.R. permit package
- Project specifications and estimate

6. Final Design - 90% & 100% .................................................................................... $20,140.00 - Improvement plans
- Finalize U.P.R.R. permit package
- Project specifications and estimate
Task 3: Monument Preservation ..................................................... $22,200.00

7. Pre-construction corner records 20 assumed .................................................... $11,100.00

8. Post-construction corner records 20 assumed ................................................... $11,100.00 Task 4: Construction Support ............................................................ $4,140.00

9. Bidding and construction phase assistance ......................................................... $2,150.00

10. As-built plans ....................................................................................................... $1,990.00 Task 5: Miscellaneous ....................................................................... $1,000.00

11. Project management and coordination ................................................................... Included

12. Progress meetings and site walks .......................................................................... Included

13. Reproductions ...................................................................................................... $1,000.00 TOTAL DESIGN FEE: $147,460.00

HOURLY RATES
Project Manager ...................................................... $215.00 Project Engineer ...................................................... $155.00 Design Engineer ...................................................... $130.00 Two-Man Field Party ................................................ $240.00 Survey Manager ...................................................... $115.00 Clerical ....................................................................... $60.00 Local Street Improvement Project - JN 553 & JN 571
Local Streets 2025-2026 and 2026-2027, JN 553 and JN 571 Project Location Map
City of Gardena
Gardena City Council Meeting

AGENDA REPORT SUMMARY
Agenda Item No. 16.E
Section: DEPARTMENTAL

ITEMS - PUBLIC WORKS
Meeting Date: September 10,
2024

TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE:

Approve On-Call Professional Services for General Civil Engineering Design, Construction Management and Inspection, Traffic Engineering, Architecture and Landscape Architecture, Geotechnical Engineering/Geology and Material Testing, and Staff Augmentation.

COUNCIL ACTION REQUIRED:

Staff Recommendations: Approve On-Call Professional Consultants for As-Needed Services
RECOMMENDATION AND STAFF SUMMARY:

The City of Gardena is experiencing an unprecedented level of activity in its Capital Improvement Program, with a record-high CIP budget of $71.5M and 44 projects. Additionally, the City has been averaging over 1,000 plan check reviews and encroachment permits in the public right-of-way annually for the past three years. The current on-call Professional Services Agreements, approved by the City Council in 2019 with various firms, are set to expire in September 2024.

Various on-call professional services are essential to support the City’s efforts in completing budgeted CIP projects, which include parks, facility remodels, feasibility studies, traffic analysis, specialized soil testing and inspections, and roadway infrastructure, including underground pipes. Utilizing consultants provides the departments with the flexibility needed to address the diverse requirements of these projects with minimal internal staffing, while also leveraging the consultants' specialized expertise.

Typically, procuring a specific consultant agreement from issuing the initial Request for Proposals (RFP) to obtaining Council approval and executing the contract can take several months. This process includes not only developing the RFP but also fulfilling all contract agreement requirements, including insurance, which also requires considerable time. To streamline this process, many local agencies have adopted the use of on-call consultants, which is also acceptable method by the Caltrans.

On-call contracts for professional services are an effective means to secure engineering, architecture, and other professional expertise, ensuring that CIP projects and studies are completed in a timely and cost-effective manner. The City can engage consultants individually for each specific scope of work or utilize the list as prequalified consultants and obtain proposals. Attached for review are the active insurance details and an on-call Professional Services Agreement (PSA). This agreement, along with the consultant’s fee schedule, will be executed for each selected firm. However, as these agreements are for on-call, as-needed services, there is no guarantee of work for any firm.

On May 9, 2024, the Public Works Department issued a Request for Qualifications (RFQ, See Attached), which was advertised on the City’s website and in IMS publication for public sector/government RFPs/RFQs. Fifty-seven Statements of Qualifications (SOQs) were received by June 13, 2024. The SOQs were reviewed and evaluated by the Director of Public Works and the Assistant Director of Public Works based on the following eight major criteria:
1 .

Presentation and Content (5%)
2 .

Project Manager’s Experience (5%)
3 .

Familiarity/Experience with the Local Region (5%)
4 .

Qualification of All Team Members (20%)
5 .

Team Resources and Availability (30%)
6 .

Relevant Project Experience (20%)
7 .

References (5%)
8 .

Fee Schedule (10%)

Each criterion was scored on a scale of 0-100 and ranked according to the highest average score. Unlike construction contracts, where the award goes to the lowest responsible bidder, professional service contracts are awarded to qualified firms based on their overall qualifications and reasonable fee structures.

Staff respectfully recommends that the City Council:
1) Approve the following top-rated firms to provide as-needed professional services in six categories for a duration of three years, with an option for staff to extend the contract for an additional two years if the consultants perform satisfactorily:

General Civil Engineering Design (10 out of total 18 firms selected) – Cannon
Corporation; Onward Engineering; TAIT & Associates, Inc.; PSOMAS; NV5, Inc.: DMS Consultants, Inc.; Kreuzer Consulting Group., David Evans and Associates, Inc.; AZTEC Engineering Group, Inc.; and John M. Cruikshank Consultants, Inc.

Construction Management and Inspection (5 out of total 10 firms selected ) – Anser
Advisory Management, LLC; PSOMAS; Onward Engineering; Cannon Corporation; and TRANSTECH Engineers, Inc.

Traffic Engineering (5 out of total 12 firms selected)
– Hartzog & Crabill, Inc.; JMDiaz,
Inc.; TJKM Transportation Consultants; David Evans and Associates, Inc.; Iteris, Inc.

Architecture and Landscape Architecture (5 out of total 9 firms selected) – Architerra
Design Group; BGB Design Group; IDS Group; BREEN Design Group; VERDE DESIGN, Inc.

Geotechnical Engineering, Geology and Material Testing (3 out of total 5 firms selected) – Terracon Consultant, Inc.; NV5, Inc.; Ninyo & Moore, Inc.

Staff Augmentation (3 out of total 3 firms selected)
– Project Partners, Inc., Kimley-Horn
and Associates, Inc., and Transtech Engineers, Inc.

2) Authorize the City Manager to approve contract amounts up to $100,000 per each project in each category during the on-call contract term. Any services exceeding this amount will be agendized for Council review.

FINANCIAL IMPACT/COST:

The consultants will be used on an as-needed basis, and costs associated with CIP projects will be charged directly to those projects.

ATTACHMENTS:

Consultant Agreement_Anser Advisory Management.pdf
Consultant Agreement_Architerra Design Group.pdf
Consultant Agreement_AZTEC.pdf
Consultant Agreement_BGB Design Group.pdf
Consultant Agreement_BREEN Design Group.pdf
Consultant Agreement_Cannon Corporation.pdf
Consultant Agreement_David Evans and Associates.pdf
Consultant Agreement_DMS Consultants.pdf
Consultant Agreement_Hartzog and Crabill.pdf
Consultant Agreement_IDS Group.pdf
Consultant Agreement_Iteris.pdf
Consultant Agreement_JMDiaz.pdf
Consultant Agreement_John M. Cruikshank Consultants.pdf Consultant Agreement_Kimley-Horn and Associates.pdf
Consultant Agreement_Kreuzer Consulting Group.pdf
Consultant Agreement_Ninyo and Moore.pdf
Consultant Agreement_NV5.pdf
Consultant Agreement_Onward Engineering.pdf
Consultant Agreement_Project Partners.pdf
Consultant Agreement_PSOMAS.pdf
Consultant Agreement_TAIT and Associates.pdf
Consultant Agreement_Terracon Consultants.pdf
Consultant Agreement_TJKM Transportation Consultants.pdf Consultant Agreement_Transtech Engineers.pdf
Consultant Agreement_Verde Design.pdf

APPROVED:
___________________________________
Clint Osorio, City Manager
City of Gardena
Gardena City Council
Meeting

AGENDA REPORT

SUMMARY

Agenda Item No. 17B.

Section: DEPARTMENTAL

ITEMS - PUBLIC WORKS
Meeting Date: March 24,
2026

TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE: Award Engineering Design Services Contract for the Western Ave Street Improvement Project, Redondo Beach Blvd. to Rosecrans Ave., JN 556 to Cannon Corporation, in the Amount of $154,927 and Approve a 10% Contingency in the Amount of $16,000
COUNCIL ACTION REQUIRED:

Staff Recommendations:

Award Engineering Design Services Contract and Approve Contingency RECOMMENDATION AND STAFF SUMMARY:

The Western Avenue Street Improvement Project, from Redondo Beach Blvd. to Rosecrans Ave., is part of the City’s ongoing Capital Improvement Program (CIP) and is identified in the Pavement Management Program (PMP).

The program aims to preserve and extend pavement life through surface treatments, asphalt overlays to enhance structural capacity, and full reconstruction where pavement has reached the end of its lifecycle. Improvements typically include the replacement of access ramps to meet ADA requirements, traffic striping and signage, and repair or replacement of cross gutters, damaged curb and gutter, sidewalks, and trees.

The proposed design services include the preparation of plans, specifications, and cost estimates. Scope of work consists of research and data collection, utility coordination, design survey, base mapping, centerline ties, bid and construction support, and preparation of as-built plans.

Staff issued a Request for Proposals (RFP) for Engineering Design Services to four (4) on-call consultants. By the March 12, 2026 deadline, two (2) proposals were received from Cannon Corporation and JMC2. Following evaluation, staff recommends awarding the contract to Cannon Corporation based on its demonstrated understanding of the project, relevant experience including prior work for the City of Gardena, and a lower proposed fee by $2,513. The final design phase is expected to take approximately six (6) months, after which the project will be advertised for construction bids.

Cannon Corporation currently provides civil engineering design services to several public agencies, including the cities of Fullerton, Irvine, El Monte, Redondo Beach, and Anaheim. Established in 1976, the firm is staffed with qualified professionals and has the capability to ensure the project meets all applicable engineering standards.

Their services will supplement the capacity of the Public Works Engineering Division in delivering this project.

Staff respectfully recommends that the City Council award a Engineering Design Services for the Western Ave Street Improvement Project, from Redondo Beach Blvd to Rosecrans Ave., JN 556, to Cannon Corporation in the amount of $154,927, and approve a 10% contingency in the amount of $16,000, to be utilized as needed.

FISCAL IMPACT/COST:

FY 2025-2026 Project Budget and Funding Source: $900,000 Prop. C and $650,000 Measure M Local

APPROVED:
___________________________
Clint Osorio, City Manager
Attachments
Cannon Proposal JN 556.pdf
Consultant Agreement_Cannon Corporation.pdf
RFP - Western Ave Street ImprovementJN 556.pdf
Project Location Map JN 556.pdf

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 1
CannonCorp.us

March 17, 2026

Mr. Jun De Castro, Associate Engineer
City of Gardena, Public Works Engineering
1717 West 162
nd Street
Gardena, CA 90247-3778

PROJECT: W ESTERN AVENUE STREET IMPROVEMENTS –
REDONDO BEACH BOULEVARD TO ROSECRANS AVENUE , JN 556

Dear Mr. De Castro and Proposal Review Committee:

Cannon Corporation (Cannon) greatly appreciates the opportunity to present our proposal to provide professional engineering design services for the Western Avenue Street Improvements Project (Project), JN 556, from Redondo Beach Boulevard to Rosecrans Avenue (length = 0.90± miles). This effort will require a specialized team with knowledge, background and capabilities to complement the City’s staff and resources to achieve success in rehabilitating the asphalt pavement, striping and improving pedestrian accessibility/safety.

Project Team . The Cannon team will be led by Project Manager, Gary Solsona, PE, QSD , who will be the single point of contact for the City. With more than 24 years of civil engineering experience in providing management and design of similar street improvement projects with the City (including the 170 th Street Improvements JN 944, Vermont Street Improvements JN 959 & 996, and Artesia Blvd Street Improvements JN 935). Our prior work with the City of Gardena has provided us with a comprehensive understanding of the City’s expectations and has enabled us to establish strong, effective working relationships with City staff. Gary will be a dedicated resource in successfully completing this project in a timely manner and will be supported by Karena Diep, EIT, as Senior Project Engineer and Andy Rowe, PE, as QA/QC Manager. Topographic survey will be provided by our subconsultant KDM Meridian.

We acknowledge that the work will be completed under the terms and conditions of our on- call agreement with the City. We are prepared to begin work as soon as we receive a Notice to Proceed from your office. The fees quoted in this proposal are valid for 60 days from this date and are based upon current California Prevailing Wages.

Sincerely,

Gary Solsona, P.E., QSD
Director, Public Infrastructure Division
C 68420

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 2
CannonCorp.us

PROJECT UNDERSTANDING AND APPROACH
This important project reflects the City’s commitment to enhance the aged asphalt pavement along Western Avenue, improving both drivability and aesthetics, while prioritizing pedestrian accessibility and safety within the project limits. The Cannon team will develop a comprehensive final construction package that includes plans, specifications, and an engineer’s estimate (PS&E) for the City to effectively bid the Western Avenue Street Improvements Project, JN 556.

Our preliminary assessment of the asphalt pavement during our site visit indicates an overall condition is “good”, with light to moderate longitudinal block cracking (see Photo 1 on next page) within the vehicular wheel path, localized alligator cracking and aged pavement. This assessment aligns with the City’s Pavement Condition Index (PCI) of generally mid-70s to mid-80s within the project limits, as documented in the City’s August 2024 Pavement Management Program Report. Prior to the 50% submission, we will conduct a site walk with the City’s Project Manager and/or Inspector to evaluate the pavement condition and identify which trees to remove and replace.

During this site walk, we will assess the need for resurfacing (such as microsurfacing or slurry seal), rehabilitation (via cold mill and overlay) and localized AC pavement dig-outs, as well as the removal and replacement of damaged curb and gutter, sidewalks (see Photo 2 on next page ), cross gutters and driveways and upgrading existing non-ADA compliant curb ramps to ADA standards (see Photo 3 on next page ). This site review will run concurrently with Cannon’s assessment of existing conditions. Based on the findings from our site walk with City staff, we will prepare the 50% plans to confirm that the proposed improvements align with the City’s expectations.

Within the project limits of Western Avenue, there are several locations featuring existing concrete pavement, particularly just north of the intersection of Redondo Beach Boulevard and along the northbound and southbound curbside lane. Our design recommendations for pavement rehabilitation assume that the existing concrete pavement will not require paving/reconstruction; instead, any necessary paving will occur outside these limits, except where damage necessitates new loops.

Additional considerations for this project include:
• Traffic signal improvements (limited to loop replacement, battery backup systems, pedestrian push buttons, and street name signs only)
• Adjustment of all manholes and utility covers to final pavement grade • Coordination with City staff to locate planting of new trees within existing tree wells where there is no tree, or tree is dead
• Restriping and replacement of pavement markings within the project limits, including damaged or poor condition markings.

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 3
CannonCorp.us

Photo 1: Existing longitudinal cracking along wheel path

Photo 2: Uplifted/damaged sidewalk requires replacement to ADA compliance

Photo 3: Existing curb ramp is missing detectable warning surface and top landing. Upgrade to ADA compliance

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 4
CannonCorp.us

SCOPE OF WORK
Phase A. Preliminary Engineering

Task 1. Kickoff Meeng/Progress Meengs (4 total meengs) We will orchestrate and aHend a Project Kickoff MeeJng with appropriate personnel from the City. This meeJng agenda will focus on project understanding, team involvement, project constraints, and the anJcipaJon of design development impediments. This meeJng will also include a project introducJon, review of background informaJon and project scope, and define the project schedule. This meeJng represents a key opportunity for representaJves from the City to steer the consultant team and further clarify criJcal elements of the project scope.

In addiJon to the kick-off meeJng, we will conduct progress meeJngs at 50%, 90% and 100% milestone submiHals with City staff by video conference to discuss and review project work status submiHals, overall design progress and upcoming schedule milestones.

We will prepare and transmit meeJng agendas to City staff a minimum of 24 hours prior to the scheduled meeJng dates. MeeJng minutes will be prepared and distributed to aHendees within 1 week of the kickoff/progress meeJngs.

Task 2. Data Collecon
We will research and obtain available data (to facilitate the final engineering design), including uJlity company contact names from City’s uJlity research, City & County record documents, and as-builts/record drawings. All data will be compiled, reviewed, and made available to the project team throughout the design effort.

Task 3. Ulity and Stakeholder Coordinaon
We will submit iniJal uJlity noJficaJons (using City-provided leHerhead) to uJlity companies requesJng copies of their maps, plans, and/or sketches of their exisJng and/or proposed faciliJes. We will use uJlity companies from a DIGALERT and/or a City-provided list. We will submit 2nd uJlity noJces (with 90% plans) within 1 week aMer issuance of the 90% PS&E submiHal to City staff, for verificaJon of faciliJes. We will submit final uJlity noJces along with approved plans, a tentaJve pre-construcJon meeJng date and a tentaJve schedule date for construcJon. We will maintain a uJlity log to track who and when noJficaJons were sent to and document the responses to the noJces. In addiJon to wriHen noJces, we will follow up on uJlity noJces by telephone, email or in person to confirm receipt and acJon.

Gardena Transit Coordinaon: Since there are several bus stops located within the project limits, we will contact Gardena Transit (GTrans) to give early notification of the project and obtain early feedback on the anticipated processes and procedures regarding bus stop locations.

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 5
CannonCorp.us

Task 4. Topographic Survey
Topographic survey will be performed primarily through manned aerial photogrammetric methods, supplemented with targeted ground surveys for nine curb ramp locaJons where we recommend preparing detailed curb ramp design due to Jght site constraints and/or obstrucJons (such as power poles) where reliance on referencing only a standard plan would be insufficient for proper construcJon:

1) 154
th Pl - SE curb return
2) 153rd St - NW curb return
3) 152nd St - SW curb return
4) Marine Ave - SW curb return
5) 149th St - SE curb return
6) 146th St - NE curb return
7) 146th St - SE curb return
8) 145th St - SE curb return
9) 144th St - SW curb return

Aerial TargeJng and Mapping: We will set sufficient aerial targets for aerial photogrammetry and perform aerial mapping of an approximate 125-foot wide corridor along Western Avenue for length of project limits. Imagery processed to produce a color orthophoto and a digital terrain model (DTM) with 1-foot contours. We will prepare “working” design cross secJons at 25-foot intervals based on the DTM

Ground Survey: Scope includes establishment of survey control including centerline monuments, benchmarks, and aerial targets and targeted Topographic survey of nine curb returns per the abovemenJoned list

Task 4.1 Monument Perpetuaon
• Identify centerline monuments that may be impacted by construction. Per the RFP, our scope of work and fee is based on preparing sixteen (16) total corner records for the sixteen (16) intersections included in the project
• Tie-out impacted survey monuments based on approved construction plans. • Draft Pre-Construction Corner Records and submit to County Surveyor for approval.

Task 5. Base Mapping & Field Review
Upon iniJaJon of base map preparaJon, Cannon will perform a comprehensive field review within the project limits to note exisJng condiJons that may affect the design (e.g. repair to damaged sidewalk, curb, guHer and driveways), note access concerns / traffic control concerns, note potenJal uJlity issues and other construcJon challenges and collect a photo- document log of the project site. From the data collected during our field review, the project’s exisJng CAD base mapping will be updated.

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 6
CannonCorp.us

UJlizing field review, topo survey and as-built informaJon, we will prepare the base maps (1”=40’ scale) in AutoCAD, which will include dimensions, street names, north arrow, scale, match lines, street centerline, exisJng R/W, staJoning, approximate locaJon of surface topographic features, and approximate locaJon of surface and underground uJliJes.

Phase B. Design

Task 6. 50% PS&E
We will develop 50% level design recommendaJons for the proposed street improvements, which will generally consist of pavement resurfacing (e.g. slurry seal) and/or rehabilitaJon (e.g. cold mill and overlay), adjustment of surface uJliJes to new finished grade, removal and replacement of damaged curbs, guHers, sidewalks, cross guHers, removal and replacement of trees idenJfied by the City, ramps, and related improvements, as necessary, traffic signal improvements limited to baHery backup systems, pedestrian push buHons and street name signs only, and upgrading exisJng non-ADA compliant curb ramps to current ADA compliance.

For proposed curb ramps, the 50% plans will reflect a construcJon note callout only. Design details of curb ramps, at the nine curb return locaJons specified in Task 4, will be included in the 90% plans.

For the proposed pavement rehabilitaJon, our design recommendaJons assume that the exisJng concrete pavement will remain intact, and that proposed paving will only occur outside these limits, unless damage necessitates the installaJon of new loops.

Once the preliminary design and recommended approac hes are approved by City staff, the final engineering will advance and refine the preliminary design concepts, to completion of the final construction documents.

Plans: Based on review of the project limits and scope of work, the following is the anJcipated 36” x 24” plan sheet count:

 One (1) Title Sheet
 One (1) Typical Sections Sheet
 Two (2) Curb Ramp Details Sheet (9 total curb ramps at 1”=5’ or 10’ horizontal scale) o Note: to be provided at the 90%, 100% and Final Plans submittal only .  Three (3) Street Improvement Plan Sheets (at 1”=40’ scale, plan view only)  Three (3) Signing and Striping Improvement Plan Sheets (at 1”=40’ scale) Total = Ten (10) Sheets

SpecificaJons: We will prepare technical specificaJons based on the proposed improvements. We will provide a bid schedule for items required by the plans, or items needed to accomplish the project construcJon in the general provisions and include them in the Contractor’s bid list. We will reference special provisions to the Standard SpecificaJons for Public Works Greenbook (latest ediJon), Caltrans or other appropriate specificaJons. The

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 7
CannonCorp.us

City will furnish the front-end contract and insurance documents to complete the specificaJon package.

Engineer’s EsJmate: A detailed engineer’s opinion of probable construcJon costs will be developed in accordance with the City’s requirements for each milestone submittal to the City. The esJmates will incorporate recent relevant bid prices, price quotes from equipment vendors as necessary, and will reflect the most recent trends in construcJon pricing.

QA/QC Reviews: Prior to all milestone submiHals for City plan check review, an experienced/independent in-house team, led by Cannon's QA/QC Manager, will perform a thorough review of said documents to confirm their quality, clarity, and that all project goals are being met. Deliverables will be prepared in accordance with engineering pracJces that address required standards and guidelines. Documents submiHed to the City will be independently checked and backchecked. The review process will include a 2nd thorough backcheck review of all recommended correcJons. We will include wriHen responses with resoluJon(s) to City comments for each resubmiHal.

Tasks 7 thru 9 90%, 100% and Final PS&E
We will develop the PS&E to 90%, 100% and Final bid-ready level and incorporate one round of City’s 50%, 90% and 100% PS&E review comments.

Phase C. Bid & Construcon Support

Task 10. Bid & Construcon Support
We will support the City during the bid and construcJon phase of the project. This scope assumes the following for elements related to plans prepared by Cannon:

• Provide technical support to the City in answering bidders’ quesJons and clarificaJons during a single bid period
• Attend the pre-construction meeting (attend in-person) • Review Contract Submittals
• Respond to Contractor Request for Information

Our services are limited to the number of hours included in the fee esJmate.

Task 11. As-built Plans
Contractor and City’s construcJon representaJve redline drawings will be used for preparaJon of electronic as-built drawings. We will draM revision clouds around all construcJon revisions and will submit a PDF copy and ACAD files of the final As-builts for the City’s records.

19000 MacArthur Boulevard, Suite 400, Irvine, CA 92612 260223 T 949.753.8111 8
CannonCorp.us

DELIVERABLES
• Kickoff meeting/progress meetings : Meeting Agendas & Minutes, Updated Project Schedule
• Utility Coordination: log and correspondence
• Topographic Survey: Topographic base map in AutoCAD; Corner records – approved signed/sealed in PDF format
• 50% , 90%, 100% & Final PS&E : Plans (PDF), Specs (PDF & Word) and Estimate (PDF) and response to City’s comments (PDF or Excel)
• Bid & Construction Support: Responses to RFIs, Responses to material submittals, As-built Plans (PDF)

ASSUMPTIONS
The following assumptions and exclusions apply to this proposal:
• City shall make available all existing data, record drawings and information relevant to the proposed project.
• Scope excludes outside agency fees, post-construction monument perpetuation, traffic control plan preparation, design of utility relocations, SWPPP preparation, water quality enhancements, design of gridded intersections, public outreach, advertising for bids and awarding of construction contracts, construction management, administration, inspection and materials testing for the construction phase, and construction staking.
• All work not set forth in the scope of work shall be deemed additional work. Should additional work be required, it is the responsibility of City staff and/or Cannon to initiate negotiations for such work. Additional work will be charged at our regular hourly rates per the on-call services agreement with the City if a fee is not negotiated. Additional work will not be commenced without written authorization from City staff.

SCHEDULE (provided herein)
FEES (a detailed breakdown of the fee is provided herein) Not To Exceed $154,927.00 T&M Not to Exceed are based on the rates per the Professional Services Agreement dated September 10, 2024 for On-Call General Civil Engineering Services.

CALIFORNIA PREVAILING WAGE
It is our understanding that this project qualifies for California Prevailing Wages.

If the scope of our work requires skilled trades which are subject to Prevailing Wage requirements, then our rates will reflect this. If the scope of our work does not require skilled trades which are subject to Prevailing Wage requirements, our rates will not reflect prevailing wage rates. We will need a DIR Project ID so that we can file our 72-hour noJficaJon prior to performing on-site work.

ID Task Name Duration Start Finish
1 PROJECT SCHEDULE 23.4 wks Mon 4/6/26 Tue 9/15/26
2 ***City Issues Notice to Proceed*** 0 wks Mon 4/6/26 Mon 4/6/26 3 PHASE A: PRELIMINARY ENGINEERING 8.4 wks Mon 4/6/26 Tue 6/2/26 4 Kick-off Meeting 0 days Mon 4/6/26 Mon 4/6/26
5 Data collection 1 wk Mon 4/6/26 Fri 4/10/26
6 Initial Utility Coordination 1.5 wks Mon 4/6/26 Wed 4/15/26 7 Topographic Survey 7 wks Wed 4/8/26 Tue 5/26/26
8 Base Mapping & Field Review 2 wks Wed 5/20/26 Tue 6/2/26 9 PHASE B: DESIGN 15 wks Wed 6/3/26 Tue 9/15/26
10 Prepare and Submit 50% PS&E 3 wks Wed 6/3/26 Tue 6/23/26 11 Meeting with City for 50% PS&E 0 days Tue 6/23/26 Tue 6/23/26 12 City Review of 50% PS&E 2 wks Wed 6/24/26 Tue 7/7/26 13 Prepare and Submit 90% PS&E 3.5 wks Wed 7/8/26 Fri 7/31/26 14 Meeting with City for 90% PS&E 0 days Fri 7/31/26 Fri 7/31/26 15 City Review of 90% PS&E 2 wks Fri 7/31/26 Fri 8/14/26 16 Utility Coordination #2 1 wk Fri 7/31/26 Fri 8/7/26
17 Prepare and Submit 100% PS&E 2 wks Fri 8/14/26 Fri 8/28/26 18 Meeting with City for 100% PS&E 0 days Fri 8/28/26 Fri 8/28/26 19 City Review of 100% PS&E 1.5 wks Fri 8/28/26 Tue 9/8/26 20 Prepare and Submit Signed Final PS&E, ready for bid
(and Final Utility Notices)
1 wk Wed 9/9/26 Tue 9/15/26
4/6 9/15

23.4 wks
4/6 4/6
4/6 ***City Issues Notice to Proceed***
4/6 6/2

8.4 wks
4/6 Kick-off Meeting
Data collection
Initial Utility Coordination
Base Mapping & Field Review
6/3 9/15
15 wks
Prepare and Submit 50% PS&E
6/23 Meeting with City for 50% PS&E
City Review of 50% PS&E
Prepare and Submit 90% PS&E
7/31 Meeting with City for 90% PS&E
City Review of 90% PS&E
Utility Coordination #2
Prepare and Submit 100% PS&E
Meeting with City for 100% PS&E 8/28
City Review of 100% PS&E
Prepare and Submit Signed Final PS&E, ready for bid (and Final Utility Notices) 3/29 4/5 4/12 4/19 4/26 5/3 5/10 5/17 5/24 5/31 6/7 6/14 6/21 6/28 7/5 7/12 7/19 7/26 8/2 8/9 8/16 8/23 8/30 9/6 9/13 9/20 9/27 April May June July August September

SUMMARY
Task
Milestone
Inactive Task
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
City of Gardena: Proposal for Western Avenue Street Improvements, JN 556 Updated: Thu 3/12/26
City of Gardena
Western Avenue Street Improvements Project, JN 556
Fee Proposal
Cannon
19000 Macarthur Blvd, Suite 400
Irvine, CA 92612
949.753.8111
Cannon Fee Schedule Classification KDM Meridian
Project Role Survey
Subconsultant
Task Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost Cost
Task 1. Kickoff Meeting/Progress Meetings (4 total meetings) 12 $3,684 5 $925 $0 1 $138 18 $4,747.00 Task 2. Data Collection 1 $307 1 $185 $0 6 $828 8 $1,320. 00 Task 3. Utility and Stakeholder Coordination 1 $30 7 4 $740 $0 12 $1,656 17 $2,703.00 Task 4. Topographic Survey (Aerial) 1 $307 1 $185 4 $6 40 1 $138 $45,947 7 $47,217.00 Task 4.1 Monument Perpetuation (16 total monuments) 2 $614 1 $138 $21,120 3 $21,872.00 Task 5. Base Mapping & Field Review 6 $1,842 28 $5,1 80 48 $7,680 82 $14,702.00 Subtotal 23 $7,061 39 $7,215 52 $8,320 21 $2,898 $67,067 135 $92,561.00 Task 6. 50% PS&E 12 $3,684 6 $1,350 42 $7,770 76 $12,160 136 $24,964.00 Task 7. 90% PS&E 8 $2,456 6 $1,350 24 $4,440 58 $9,280 96 $17,526.00 Task 8. 100% PS&E 4 $1,228 1 $225 20 $3,700 24 $3,840 49 $8, 993.00 Task 9. Final signed PS&E, bid-ready 1 $307 2 $370 2 $32 0 5 $997.00 Subtotal 25 $7,675 13 $2,925 88 $16,280 160 $25,600 286 $52,480.00 Task 10. Bid & Construction Support 6 $1,842 12 $2,220 12 $1,920 30 $5,982.00 Task 11. As-built Plans 2 $614 2 $370 12 $1,920 16 $2,904. 00 Subtotal 8 $2,456 14 $2,590 24 $3,840 46 $8,886.00
Total Estimated Hours 56 $17,192 13 $2,925 141 $26,085 236 $37,760 21 $2,898 $67,067 467 $153,927.00 Reimbursables $1,000
$154,927
Phase B. Design
Phase C. Bid & Construction Support
=
Project Assistant Project Manager QA/QC & Technical
Design Support
Engineering Assistant II Principal Engineer Sr. Project Engineer Phase A. Preliminary Engineering
$307 $225 $185 $160 $138
Estimated
Cannon
Hours
Estimated
Cost Sr. Project Engineer Design Engineer
Director Design Engineer

NOT TO EXCEED GRAND TOTAL
=
ii
CannonWestern Ave. Street Improvements - Redondo Beach Blvd. to Rosecrans Ave.

Mr. Solsona has 24 years of civil engineering experience in public works design, consisting of award-winning active transportation, roadway widening, street rehabilitation and intersection improvements; sound wall and retaining wall design; and preparation of traffic control plans and project study reports. He is recognized in the industry as an ADA design specialist. His proactive approach is carried out seamlessly through project management, engineering design development, and construction support services to public agencies throughout Southern California and he has a proven track record in providing innovative, cost-saving, and sustainable solutions (such as alternative pavement rehabilitation methods, including full depth reclamation and cold-in-place-recycling) on numerous street improvement projects for major arterials and residential streets.

Artesia Boulevard Arterial Improvements, Gardena, California: The City of Gardena wanted to replace existing medians along Artesia Boulevard, from Western Avenue to Vermont Avenue, with a new decorative hardscape paving solution. Based on prior discussions with City staff, the Cannon Team evaluated and presented four paving solutions to the City. Our team prepared a design study (exhibit) to convey the proposed limits of add or deducted hardscape for City direction. Following approval of the conceptual design direction, Cannon completed revisions to the previously submitted 95% design PS&E. Mr. Solsona served as Project Manager.

Redondo Beach Blvd Arterial Improvements, Gardena, California: Cannon provided PS&E design services to improve safety, access, and traffic operations along Redondo Beach Boulevard in Gardena. The project involved modifying raised medians, extending left-turn pockets, and improving traffic channelization.

Additional improvements included pavement reconstruction, bulb-outs, ADA- compliant curb ramps, and traffic signal upgrades for a 2-mile stretch of the boulevard. Mr. Solsona served as Project Manager.
170th Street Improvements, Gardena, California: This project spanned 0.50 miles from Normandie Avenue to Vermont Avenue. Funded partly by $500,000 from the Federal Surface Transportation Program, the project focused on enhancing street drivability and aesthetics. Key accomplishments included rehabilitating asphalt concrete pavement, repairing concrete curbs and sidewalks, upgrading curb ramps to ADA standards, and installing a traffic signal system battery backup at a major intersection. Cannon’s role encompassed preparing construction plans, specifications, cost estimates, and handling the E-76 Authorization documentation, culminating in a project that met the City of Gardena’s safety and accessibility standards. Mr. Solsona served as Project Manager.

Select Project Experience Summary
• Gardena Catch Basin Screens Project, Gardena, California • Rowley Park Restroom, Gardena, California
• Anaheim Modjeska Park Underground Storm Water Detention and Infiltration System Anaheim, California
Professional Registration
• Civil Engineer, California,
No. 68420
• Qualified SWPPP Developer
– Practitioner #234666
Education
• Bachelor of Science, Civil
Engineering, California
State Polytechnic University,
Pomona, California
Professional Affiliations
• Member – ASCE, ACEC and
APWA
• Past Board Member –
Filipino American Society of
Architects and Engineers
Gary Solsona, PE, QSD Project Manager
Resumes

iii
CannonWestern Ave. Street Improvements - Redondo Beach Blvd. to Rosecrans Ave.

Andy Rowe, PE, QSD/P, LEED AP Design Manager
Professional Registration
• Registered Civil Engineer,
California, No. 75626
• LEED Accredited
Professional
• Qualified SWPPP Developer
Education
• Bachelor of Science, Civil
Engineering, California
Polytechnic State University,
San Luis Obispo, California
Certifications
• Certified Erosion and
Sediment Control Lead
Course, Washington State
Department of Ecology
Presentations
• The New ADA Design
Standards: When, Where,
and How?, Lorman
Education Services
• A Comprehensive Approach
to Building Excellent ADA
Facilities within the Public
Right-of-Way, Lorman
Education Services
Mr. Rowe’s expertise includes engineering design services for both public and private developments since 2004. He is knowledgeable in ADA design requirements for sidewalks, curb, and transportation projects. He is also knowledgeable in roundabout designs as well as roadway widening and street improvements. His storm drainage design experience includes extensive work with the treatment of runoff from the development of new impervious surfaces with the use of bio-swales and filter media.

As a LEED Accredited Professional, he looks forward to the challenge of finding a balance between development cost and environmentally responsible design. He has provided LEED consulting services for a variety of institutional projects.

Measure K-14 Street Repair and Rehabilitation Program, Grover Beach, California:

Cannon provided design, bidding, and construction phase support services for the project with the following scope of work included a field survey of five miles of roadway, including Right-of-Way, utilities, and 150 existing ADA ramps. The design included intersection improvements to alleviate existing drainage/flooding issues using cross gutters as well as re-grading and re-aligning roadways, analysis and improvement of existing ADA curb ramps to meet current compliance standards, and analysis for potential green infrastructure improvements such as bioretention, bioswales, and infiltrators. Mr. Rowe served as Project Engineer.

Pavement Rehabilitation Design Services, Carpinteria, California: Cannon provided consulting design services and construction support for pavement rehabilitation for Carpinteria Avenue, 8th Street, and Nipomo Drive. We prepared PS&E and provided engineering support services during construction. This project included roadway rehabilitation design considering existing materials conservation methods such as crack and seat of existing concrete roadway surface; full depth reclamation with cement roadway pavement improvement design method; new bulbout, curb ramps, and crosswalk design; and signage and striping. Mr. Rowe served as Project Engineer.

Coldwater Canyon Pavement Design and Construction Support, Beverly Hills California: The City of Beverly Hills selected Cannon to provide full design and engineering services for pavement rehabilitation and reconstruction. The scope of work included evaluating existing roadway sections, developing horizontal and vertical alignment improvements, and upgrading ADA ramps resulting in improved roadway performance, safety, and accessibility in this key corridor. Mr. Rowe served as Project Engineer.

Select Project Experience Summary
• 21st Street: Complete Street Design and Stormwater Improvements, Paso Robles, California
• Wright Way Design, Paso Robles, California
• Hutton Road Widening, San Luis Obispo, California
• 12th Street Green Improvements, Paso Robles, California • Design for Community Development Block Grant 2022 Curb Ramp Project, San Luis Obispo, California
iv
CannonWestern Ave. Street Improvements - Redondo Beach Blvd. to Rosecrans Ave.

Karena Diep, EIT Project Engineer
Professional Registration
• Engineer-in-Training,
California, No. 170694
• LEED Accredited
Professional
• Qualified SWPPP Developer
Education
• Bachelor of Science, Civil
Engineering, University of
California, Irvine, California
Ms. Diep brings five years of experience working on various projects within both the public and private sectors, including street improvements, water and wastewater resources, and BMP layouts. She is responsible for tasks including drafting and preparing cost estimates. Ms. Diep has worked with numerous agencies and municipalities throughout Southern California, such as the City of Gardena, City of Los Angeles, and Port of Long Beach, and she is thoroughly familiar with regulations and design standards. Ms. Diep uses her attention to detail and efficiency when working on different projects and strives to help produce high quality designs.

Artesia Boulevard Arterial Improvements, Gardena, California: The City of Gardena wanted to replace existing medians along Artesia Boulevard, from Western Avenue to Vermont Avenue, with a new decorative hardscape paving solution. Based on prior discussions with City staff, the Cannon Team evaluated and presented four paving solutions to the City. Our team prepared a design study (exhibit) to convey the proposed limits of add or deducted hardscape for City direction. Following approval of the conceptual design direction, Cannon completed revisions to the previously submitted 95% design PS&E. Ms. Diep served as Project Engineer.

Vermont Street Improvements, Gardena, California: The City of Gardena wanted to enhance deteriorated Asphalt Concrete (AC) pavement to improve drivability, aesthetics, pedestrian safety, and ADA egress within the project limits.

Improvements from Artesia Blvd. to approximately 350’ north of Gardena Blvd.

This project included Federal funds, Measure M local funds, and coordination with both Caltrans and Union Pacific Railroad. The City selected Cannon to prepare a final construction package consisting of plans, specifications, and an engineer’s estimate (PS&E) for the City to successfully bid the Vermont Street improvements for construction. The PS&E construction documents included AC pavement rehabilitation, with localized dig-outs; PCC repair of damaged curb and gutter, sidewalk, and upgrades to non-ADA compliant curb ramps (along the southbound project limits). This project also included median drive access roads and parking lots.

Ms. Diep served as Project Engineer.

Rio Vista Street and Lincoln Avenue Pavement Rehabilitation and Sewer Improvements, Anaheim, California: The City of Anaheim wanted to complete street improvements in conjunction with a sewer improvement project. Cannon provided design services for asphalt concrete (AC) pavement rehabilitation, drainage improvements, and replacement of damaged Portland cement concrete (PCC) curb, gutter, sidewalk, driveway, and cross gutters. We also prepared traffic control plans and obtained an approved Caltrans encroachment permit for improvements at Rio Vista Street and Lincoln Avenue. Work also involved obtaining an approved Caltrans encroachment permit for the proposed sewer improvements at the intersection of Rio Vista Street and Lincoln Avenue. Ms. Diep served as Project Engineer.

Select Project Experience Summary
Ms. Diep has served as Project Engineer on the following projects:
• 4th Street – Phase II, Santa Monica, California
• Los Angeles Sidewalk Repair Program, Los Angeles, California • Fullerton 44085 Raymond Avenue Pavement Rehabilitation, California • Irvine Civic Center Secured Parking Lot Expansion, Irvine, California

Consultant Agreement with Cannon Corporation Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH CANNON CORPORATION

This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena , a municipal corporation (“City”) and Cannon Corporation, a CA Corporation (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on- call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management & Inspection

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and

C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and

D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 2
progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RF Q, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 3
and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10. COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11. INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 4
comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 5

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:

a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”

b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.”

c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.”

d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers.

e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self -insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or self- insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 6
losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12. INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 7
recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13. COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14. INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15. PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 8

16. NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17. OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18. CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub- consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.

"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub- consultants agree not to release, divulge, Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 9
publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19. NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20. WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21. COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement
.

22. CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.

23. NON-DISCRIMINATION. Consultant covenants there shall be no discrimination Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 10
based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24. FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer

To Consultant: Cannon Corporation
16842 Von Karman Ave, Ste 150
Irvine, CA 92606
Attn: Gary Solsona
Director of Public Infrastructure

Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27. LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28. FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.

29. PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 11
that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq .). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30. MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;

B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations;

C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31. BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32. GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33. SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34. AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

35. ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 12
attorney’s fees and court costs from the opposing party.

36. PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37. SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38. ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39. ELECTRONIC SIGNATURE . The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with Cannon Corporation Page 13

IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – Cannon Corporation

________________________________ _________________________________ Tasha Cerda, Mayor Name

ATTEST:

Sign:_____________________________
Title:

________________________________
Mina Semenza, City Clerk _________________________________ Name

APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 COO
Karen Morris
President
Michael Cannon

Exhibit A
Request for Qualifications (RFQ)

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

REQUEST FOR QUALIFICATIONS (RFQ)
FOR

GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION

MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,

ARCHITECTURE AND LANDSCAPE ARCHITECTURE,

GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL

TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:

MAY 2024

Memoranda:

Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.

City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A”‐
Gardena Standard Professional Services Agreement…………….……………… 10

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 1 | Page

SECTION I

NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services

N
OTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on ‐c all
services related to our Public Works Capital Improvement Program and Ge neral Engineering. The work will be assigned on an as‐n
eeded basis for various projects in the City.

T
he Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.

The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/

Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217‐9 643 or k
[email protected].

BACKGROUND
T
he City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council ‐M
anager form
of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built‐o
ut, with a few remaining undeveloped parcels and a 9.4‐a cre wetland preserve, Gardena
Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.

T
he Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.

Th
e existing city ‐o
wned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City disc harge to the LACSD interceptor at over 100 locations.

Th
e existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).

The collection system pipes within the City primarily discharge to the Dominguez Channel.

Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.

The City has six (6) parks with community buildings, two gymnasiums, and a parkette. Additionally, the Gardena Wetland Preserve is situated next to Johnson Park. The City is currently constructing a new pool and senior center community center. Furthermore, the newly acquired Chase Bank Building on Rosecrans Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 2 | Page

Boulevard is slated to become a new Community Center, and Mas Fukai Park is in the construction document phase for improvements.

SUBMITTAL DEADLINE
Complete proposal/Statement of Qualification must be submitted no later than Thursday, June 13, 2024, at 2:00 p.m. PST. Three (3) hard copies and one complete PDF copy (on CD o r memory stick) shall be address to:

City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247‐37
78 Attn: Kevin Kwak, Assistant Public Works Director
T
he City currently anticipates conducting the selection process according to the following schedule, which is subject to revision. The City reserves the right to modify the schedule as needed.

May 9, 2024 RFQ Released
June 3, 2024 RFI Deadline
June 13, 2024 Proposal/SOQ Deadline
July 9, 2024 Staff Short List Selection
July 23, 2024 City Council Review/Approval

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 3 | Page

SECTION II

SCOPE OF SERVICES/SCOPE OF WORK

The City of Gardena would like the selected firms to provide professional on‐call engineering, architecture, and/or landscape architecture services (including Construction Documents, PS&E, technical memoranda, research studies, plan checks, testing, etc.) for City projects to support the Public Works Department. The City intends to select between three and five (3‐5) consultants for each respective service category, with the exception of only one or two consultants for Geotechnical Engineering/Geology/Mater ial testing.

However, the actual number of consultants selected may be subject to change based on the number of responses and qualifications.

The award agreements are to provide on‐call services for a period of three (3) years. The agreements may be renewed at the City’s discretion for up to two (2) additional years, subject to satisfactory performance during the initial three ‐year term. The ini tial three‐year term is anticipated to commence in September 2024 and end in September 2027. The City encourages firms to submit qualifications for any or all parts of the key services listed below to be eligible for placement on the qualified on‐call/as‐needed list for each service category separately.

At the City’s discretion, selected firms will be assigned projects based on their qualifications in relation to the project(s) scope of work, or requested to submit a proposal, on an as‐needed basis for various projects in the city. The City does not guarantee that successful firms will be provided with any projects.

MINIMUM QUALIFICATIONS
Only those consultants with verifiable experience related to the services requested in this solicitation will be considered during the evaluation process. Consultant staff assigned to execute the scope of services must have relevant experience in providing the necessary services as described in the scope. All personnel assigned to the work must possess appropriate certification or registration as required by state and local agencies.

SCOPE OF WORK
Selected firms will report to and operate under the direction of the City of Gardena Public Works staff to provide professional engineering, architecture, and/or landscape architecture services to the City. In general, the selected consultants will be expe cted to provide services and staffing for the following categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
Consultants may submit qualifications for one or more of the service categories requested; however, separate proposals and letter of transmittals must be submitted for each category.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 4 | Page

GENERAL CIVIL ENGINEERING DESIGN
Provide complete design services for Capital Improvement Program projects. Example services include, but not limited to:
• Plan preparation for street improvements, repair, rehabilitation, or other related street improvements.
• Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
• Preparation of hydrology and hydraulic analysis and reports. • Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. • Geotechnic engineering and material testing as needed. • Preparation of project technical provisions.
• Preparation of detailed cost estimates.
• Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. • Provide design and construction surveys.
• Provide construction assistance.
• Coordination with, and approvals from other permitting agencies and utility companies.

CONSTRUCTION MANAGEMENT AND INSPECTION
Provide complete construction management and inspection services for CIP, including park renovations, and facility construction/ modifications/ modernizations. Including, but not limited to:
• Coordinate and lead project construction meetings.
• L
ead all meetings during the construction from pre‐c
onstruction to final closeout.
• P
rovide and maintain project files/documents per City template. • Provide and supervise construction observations/inspections for CIP projects such as streets, sewer, storm drain, parks and facilities.
• Provide construction inspection services in grading, street improvements , drainage, SWPPP/erosion control, paving, sewer, water, and franchise utilities. • Provide public contract administration (i.e. CCO, Daily logs/report, Weekley Statements, Notices, labor compliance/enforcement).
• Provide utility company coordination.
• Provide labor compliance/enforcement as needed.
• A
ssure contractor to maintain a set of as‐b
uilt plans.
• S
chedule the final walk‐t
hrough inspections and prepare a “punch‐lis
t”.
• C
ollect and review the Certified Payrolls as needed.
• Assume contractor to obtain all necessary permits.
• P
rovide constructability review, quantity take‐o
ff and cost estimates as needed.

TRAFFIC ENGINEERING
Provide traffic design engineering and/or study/analysis services for signal and signing, striping, grant writing, and all related services, including but not limited to:
• Improvements associated with traffic signal design.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 5 | Page

• Preparation of signing, striping, signal modifications, detour, and traffic control design • Preparation of special traffic studies
• Conducting signal synchronization studies (before and after synchronization travel time), utilizing HCM method for LOS, as well as Los Angeles County standards.

ARCHITECTURE AND/OR LANDSCAPE ARCHITECTURE
Provide architecture and/or landscape architecture professionally services for public facilities. Including, but not limited to:
• Provide conceptual design, master plan, feasibilities study and envelope evaluations. • Renovation and/or expansion of existing public facilities. • Preparation of landscape/planting plans and irrigation. • Parking lot and hardscapes improvements.
• Playground layout and play structure design/upgrade.
• Preparation of project special provisions and technical specifications • Provide cost estimates.
• Provide constructability review and construction support.

GEOTECHNICAL ENGINEERING, GEOLOGY AND MATERIAL TESTING
Provide complete design, construction, or assistance services for City improvement projects and/or investigations. Services include, but are not limited to:
• Complete soils investigation and preparation of Geotechnical Engineering reports and studies, such as pavement design, grading requirements, retaining wall parameters, slope stability analysis, sinkhole/voids investigation and analysis, etc. • Laboratory work related to all aspects of Geotechnical Engineering. • Provide construction inspection for items such as asphalt concrete, aggregate base, and concrete placement during construction, grading excavation, and backfill. • Provide testing services such as field compaction and laboratory testing of soils, aggregates, asphalt, and concrete.

STAFF AUGMENTATION SERVICES (Firms may submit only for positions or service they provide.) Provide qualified and available personnel to provide professional staff augmentation services and/or backfill various positions and classifications within the Engineering Division on short notice. Positions include but are not limited to: Engineer(s), Permit Technician(s), and Inspector(s) and perform duties as an “Acting” City representative. Positions may require personnel reporting to City offices.

Immediately the City plans to augment one (1) Associate, Civil, or Senior Civil Engineer based on the qualification and best fit for the City. Other categories of augmentation services are not currently needed, however will be requested as needed.

Sample duties include, but not limited to:
• En
gineer(s) general requirements (Identify an Engineer with r esume and proposed classification; Associate, Civil, or Senior Civil Engineer) ‐ Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 6 | Page

o Able to work minimum 20 hours per week or more. The City is open to accepting full ‐ time services as well.
o Perform mathematical computations and estimates.
o Simultaneously handle several tasks and continue to reestablish priorities. o Communicate clearly and concisely with others, orally and in writing. o Ability to establish and maintain effective team relationships with all internal and external customers.
o Able to operate Microsoft Office and AutoCAD.
o Able to perform in indoor and outdoor environments with exposure to the elements. o May be required to pass a security/background check and a drug test prior before providing any services to the City.
o Must maintain a valid California Drive License.
o You may be required to work more than 40 hours a week and/or work irregular hours, particularly during emergency situations.
o Typical working hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. or 9/80 schedule from 7:30 a.m. to 5:30 p.m.
o Civil and Senior Engineer position s require a California Professional Civil Engineering license.
o May be required to arrange for the City to interview a candidate, a t the Consultant’s expense, for a period of up to one (1) hour.

Typical Responsibilities – The staff will be under general direction of Engineering Division Manager, performing and overseeing various CIP projects from preliminary design to final construction. Examples of duties and responsibilities are as follow:
o Prepares RFP/RFQ for design and Construction Management and Inspection (CMI) services.
o Prepares and/or oversees design Plans, Specifications, & Estimates (PS&E). o Prepares and leads project bid processing, writes council agenda report, and executes contract.
o Oversees CMI services.
o Prepares Caltrans required submittals and coordinates review process (i.e. PES, E76 o and Contract award packages).
o Performs minor drafting, computing, and checking field operations as related to the layout and construction of pavement, curbs, gutters, sidewalk, traffic, utilities and other CIP.
o Performs LA Metro required project reporting, reimbursement process, etc. o Interprets and applies GREENBOOK, Caltrans Standards, City Standards, and other laws and regulations relating to CIP projects.
• Provide Permit Technicians to assist public at Engineering public counter (Not required to identify personnel at this time).
• Provide Construction Inspection services (Not required to identify personnel at this time) , such as:
o CIP projects such as street rehabilitation; sewer or storm drain improvements, facility modifications and improvements; park rehabilitation and improvements. o Private development including paving, utilities, sewer, storm drains, paving, etc. o Repairs and improvements by private utility companies.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 7 | Page

SECTION III

SUBMITTAL REQUIREMENTS

The Proposal package shall be organized and presented in a neat and logical format relevant to the services requested. Submittals shall be clear, accurate, concise, and comprehensive. There is no page limitation, however, excessive, or irrelevant material will not be favorably received.

The Proposal should be in the order below and include the following:
• Cover
• Cover Letter
o C
learly indicate the on‐c
all service category.
o E
xpress why Consultant is interested in the RFQ.
o Include contact information for the person responsible for the Proposal and who will be the point of contract for the City.
o Include any unique attributes or distinguishing characteristics which would be of value to the City.
o State if any addendums have been received and include in the Proposal. o Statement regarding acceptance of Agreement and insurance requirements. o Letter shall be signed by an officer of the firm who is authorized to bind the firm to the contract. Include a statement to this effect.
• Firm Qualifications and Experience
o Describe firm’s background and experience.
o Describe your firm’s strengths.
o State how your firm produces deliverables free of errors and how you will address erros if they occur.
o Include experience and technical competence of subconsultants. o Familiarity of regional grants/competitive funds (SBCCOG & LA Metro) • Key Personnel and Experience
o Experience and history performing directly for local agencies within the last five years. o Include subconsultants if any.
• Organization Chart
• Similar Projects/Services
o Brief description of the project scope, personnel involved and their roles, plus agency and contact information of agency Project Manager/Engineer. o Projects that the firm was the prime consultant and responsible for management of any subconsultants.
• References
o Current contact information related to projects completed within the last five years. • Fee Schedule
• Resumes
Note: All licensed professionals in 'responsible charge' working on City projects (Engineers, Architects, Landscape Architects, and/or Surveyors) are required to disclose all disciplinary actions against them, including any future actions. Please provide a copy of any discip linary actions with the proposal submission. Additionally, provide a statement if there are no disciplinary actions.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 8 | Page

SECTION IV

FEE SCHEDULE

A fee schedule should be included in the Proposal. This schedule should comprise a comprehensive list of positions and labor rates for all services provided by the prime consultant and all subconsultants. Rates should cover all necessary resources, including labor, equipment, materials, incidental reports, transportation, etc. Any percentage markup of subconsultant invoices shall be specified.

The fee schedule should remain fixed throughout the initial term of the Agreement unless formally amended by the City Council. Adjustment of the fee schedule can be negotiated if the City renews the Agreement.

The City is subject to prevailing wage laws, which apply to professional service providers and their subconsultants for whom the Department of Industrial Relations has established a wage determination.

This includes, but is not limited to, Field Soils Mate rials Testers, Operating Engineers, Surveyors, and Building/Construction and Specialty Inspectors.

Prevailing wage requirements apply when a Consultant and/or Consultant Team is awarded a contract for a specific project, which is designated by the issuance of a City Purchase Order.

SECTION V

SELECTION/EVALUATION CRITERIA

The Proposals will be evaluated by City of Gardena Public Works Department staff. The evaluation criteria will include:
• Presentation, completeness, clarity, organization, and conformance to the RFQ content. • Project Manager’s experience related to the City’s requirements and needs. • Familiarity/Experience related to the South Bay Cities Council of Governments (SBCCOG), Los Angeles County Metropolitan Transportation Authority (Metro), and Caltrans project programs, funding opportunities, grant writing, and their requirements. • Qualifications and resumes of staff members, subconsultants, and organization chart. • Similarity of the firm’s referenced projects completed within the last five years to the City’s expected projects.
• Availability and depth of staff and resources to deliver quality products on schedule, including work on short notice and under time constraints.
• References.
• Fee schedule.

During the evaluation period, the City may conduct negotiations with the most qualified consultants.

However, consultants should note that an award may be made without negotiations or discussions.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 9 | Page

SECTION VI

GENERAL CONDITIONS

By submitting a Proposal, the Consultant represents that they have thoroughly examined and become familiar with the requirements of this RFQ and are capable of performing quality work to achieve the objectives of the City.

The City reserves the right to withdraw the RFQ at any time without prior notice. The City makes no representations that any Agreement will be awarded to any Consultant responding to this RFQ. The City reserves the right to extend the deadline for Proposal s, postpone reviewing the Proposals for its own convenience, reject any and all Proposals without indicating any reasons for such rejections, and negotiate with any qualified consultant. The City does not guarantee that successful firms will be provided with any projects.

The successful consultant(s) and sub‐c onsultants are required to obtain and maintain a City of Gardena business license and insurance. The license and insurance shall be maintained for the duration of the Agreement. A current business license is not a prerequisite for submittal of the qualifications.

T
he City is not liable for any costs incurred by the Proposers before entering into a formal agreement.

Costs for developing the Proposal or any other such expenses incurred by the Proposer in responding to this RFQ and entirely the responsibility of the Proposer and shall not be reimbursed by the City.

The City is not responsible for Proposals which are delinquent, lost, incorrectly marked, sent to the wrong address, or sent by mail or courier service and not signed for by the City.

SECTION VII

AGREEMENT AND INSURANCE

The City’s standard Professional Services Agreement is included in Appendix A. The Consultant will be expected to enter into the Agreement without substantive changes. Any changes will require approval by the City Attorney. If there are any exceptions or if there are no exceptions, a statement to the effect shall be included in the proposal as well.

The City’s standard insurance requirements are included as part of the standard Professional Services Agreement included in Appendix A. The consultant shall procure and maintain throughout the duration of this Agreement.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 10 | Page

SECTION VIII
APPENDIX “A”

Gardena Standard Professional Services Agreement

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH XYZ

This Agreement is entered into this day of , 2024, by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity ] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on- call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and

C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and

D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order : (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 3

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10. COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee proposal hereto and incorporated herein by reference. In no event shall compensation under this Agreement exceed _____________and 00/00 ($###.##) without the prior written authorization of the City Council.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11. INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 4
extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 5
shall be issued by an insurance company which is admitted to do business in the State of California.

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:

a. Additional ins ureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”

b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.”

c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.”

d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers.

e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self -insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or self- Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12. INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 7
the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or misconduct of Consultant . This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13. COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14. INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15. PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 8
paid by City for employer contribution and/or employee contributions for PERS benefits.

16. NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17. OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18. CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub- consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.

"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 9
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub- consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19. NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20. WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21. COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement
.

22. CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 10
Agreement.

23. NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24. FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works

To Consultant: XYZ
Address
XXXX, CA #####
Attn: Name
Tittle

Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27. LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28. FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 11
own risk, until written instructions are received from City.

29. PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq .). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30. MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;

B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations;

C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31. BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32. GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33. SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34. AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 12

35. ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover attorney’s fees and court costs from the opposing party.

36. PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37. SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38. ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39. ELECTRONIC SIGNATURE . The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Consultant Agreement with XYZ Page 13
other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – XYZ

________________________________ _________________________________ Tasha Cerda, Mayor Name

ATTEST:

Sign:_____________________________
Title:

________________________________
Mina Semenza, City Clerk _________________________________ Name

APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

2024 City of Gardena RFQ On-Call Professional Services

JUNE 4, 2024

RFQ FOR ON-CALL PROFESSIONAL SERVICES
ADDENDUM 01

TO: ALL RFQ HOLDERS
ADDENDUM NO. 1, AS DESCRIBED BELOW, IS FOR THE USE OF CONSULTANTS SUBMITTING THE STATEMENT OF QUALIFICATIONS OR RESPONSES TO THE CITY’S REQUEST FOR QUALIFICATIONS. ALL

CONSULTANTS SHALL INDICATE ON THE STATEMENT/PROPOSAL COVER LETTER THAT THEY HAVE RECEIVED THIS ADDENDUM NO. 1.

QUESTIONS & RESPONSES:

1. In regard to the subject RFQ Scope of Work for General Civil Engineering Design as shown on page 4, can you please confirm if the City would like us to include Geotechnical services as part of the Civil component as stated, since there is also a separate RFQ category for Geotechnical service on page 5? No, please submit a separate statement of qualifications if your firm is interested in providing services in the category of Geotechnical Engineering, Geology, and Material Testing. This category is intended for direct geotechnical services for the City. F or General Civil Engineering Design, it is expected that the lead consultant will team up with your desired geotechnical consultant or your own qualified staff as needed to provide complete PS&E construction documents.

2. Can firms be both a prime consultant and a sub- consultant to another team in the same or different service category?
Yes, firms can be both.

3. Will the City allow the usage of the City’s logo in the proposal materials? Yes, the City will allow the usage of the logo.

4. Can you specify how “Associate, Civil, and Senior Civil” Engineers are classified? Is it based on number of years of experience or other criteria?
You may reference the City of Gardena’s job specifications as your minimum guideline:
https://www.governmentjobs.com/careers/cityofgardena/classspecs. The specifications for the Senior Civil Engineer position have not been developed. Therefore, assume that the job responsibilities are similar to those of a Civil Engineer, but require a minimum of 8 years of experience, including managerial experience. As mentioned, these specifications are minimal guidelines and consultants are encouraged to propose additional qualifications or experience to provide a competitive proposal.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

2024 City of Gardena RFQ On-Call Professional Services

5. Can you please confirm if firms are able to just submit a proposal for the geotechnical engineering/geology and material testing services or require having a team with a construction management company in order to pursue this?
Yes, you may just submit a proposal/statement for the geotechnical/geology and material services.

6. Do you anticipate consultants to support and prepare grant applications? The City may request services under General Civil Engineering, Traffic Engineering, Architecture and/or Landscape Architecture as applicable.

7. You are requesting references in the Similar Projects/Services and the References sections. Can you please clarify what information you would like in each section since both sections are asking for client contact information?
The information can overlap; however, Similar Projects/Services should identify specific projects with scope descriptions, key personnel and their roles, project dates, etc., as mentioned in the RFQ. The Reference Section should identify the current contac t agency, person, phone number, and email so the reviewer can perform the reference check if necessary.

END OF ADDENDUM 01
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

Exhibit B
Statement of Qualifications (SOQ)

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Reliable Responsive Solutions
Proposal forProposal for
General Civil Engineering General Civil Engineering
On-Call Professional On-Call Professional
ServicesServices
GardenaGardena
City ofCity of
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Table of Contents
Section 1: Firm Qualifications and Experience ...............................5 Familiarity of regional grants/competitive funds ..................................................... 1 1 Section 2: Personnel and Experience ..............................................12 Section 3: Organization Chart
........................................................... 14 Section 4: Similar Projects/Services
................................................ 15
Section 5: References
.......................................................................... 21 Section 6: Fee Schedule
......................................................................22 Section 7: Resumes
.............................................................................. 29 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
June 13, 2024City of Gardena
Public Works Department
1717 West 162
nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, PE, Assistant Public Works Director
Subject:

Statement of Qualifications for On-Call General Civil Engineering Design Services
Dear Mr. Kwak:

The City of Gardena (City) is seeking general civil engineering services on an as-needed basis to support the City’s Public Works Capital Improvement Program (CIP). Our interest in this RFQ stems from our history of delivering successful on- call projects for the City. Our goals align with the City’s mission to provide the highest quality of life, a safe and attractive environment, and a sound economic future for the community. We understand the dynamics associated with delivering on-call public agency projects and pride ourselves in listening to, and promptly addressing, our client’s needs, doing the job right the first time, and reducing the amount of time required by City staff. Cannon offers the following benefits in support of the City’s CIP , namely park and facility improvements, streets, sewer and stormwater improvements:

On-Call Engineering Experience
Cannon will provide in-house civil, water resource, construction management/ inspection, and surveying services. Throughout the past 48 years, Cannon has managed on-call contracts with public agencies using our standard best practices that are based on communication and responsiveness, specifically responding to emails, phone calls, and requests from our clients in a timely manner. Cannon has an outstanding record of delivering services on time and within budget. We will operate as an extension of City staff and will keep the City’s goals for projects at the forefront of our decision process.

Highly Qualified and Experienced Project Engineering Design Team Gary Solsona, PE, QSD, will serve as Principal-in-Charge/Contract Manager. He will be responsible for coordinating activities with the City, including committing the right resources to fit the City’s needs. Gary has been providing engineering and design services to many Southern California cities throughout his 22-year career. He understands the City’s project delivery process, standards, local environment and has developed good working relationships with the City, other local resource agencies, utilities, and permitting agencies. Marco Canta, PE, will serve as Project Manager and has over 21 years of professional consulting experience.

Mr. Canta has worked on various projects in public works, roadway, drainage, utilities, and site design throughout Southern California. We bring a robust and highly skilled team of engineers, construction managers, and survey professionals who specialize in relevant scope items, such as street improvements, roadway widening, ADA compliance and rehabilitation/reconstruction/preservation projects, mapping and legal descriptions for right-of-way acquisitions, construction staking and construction assistance.

Category: General Engineering
We will operate as
an extension of
City staff and will
keep the City’s
goals for projects
at the forefront
of our decision
process.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Subconsultants
We have selected stellar subconsultants with whom we have a long working relationship. Iteris will provide traffic engineering services, LOR Geotechnical Group, Inc. will provide geotechnical engineering services, BGB Design Group will provide landscape architecture and irrigation, AKAL Consulting will provide grant writing support and federal-aid E-76 processing, and Epic Land Solutions will provide right-of-way acquisition support.

Required Statements
• Cannon and its subc onsultants have no disciplinary actions to disclose. •
Cannon ackno
wledges the receipt and review of addendum one.
•
Cannon has r
eviewed the City’s sample agreement and insurance requirements and takes no exceptions.

We look forward to the opportunity to work with the City to achieve its goals and objectives. I, Gary Solsona, am available at the contact methods provided below should you require additional information or have any questions.

Sincerely,
Gary Solsona,* PE, QSD
Director of Public Infrastructure
16842 Von Karman Ave., Suite 150, Irvine, CA 92606
( 949.777.1580 📱 909.234.7857
* [email protected]
*Authorized representative to legally bind firm
Main Point of Contact
Gary Solsona, PE, QSD
Director of Public Infrastructure
16842 Von Karman Ave., Suite 150,
Irvine, CA 92606
( 949.777.1580
* [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 5 CannonCity of Gardena, On-Call Civil Services
Firm Qualifications and Experience
11 Office Locations
Services for the City will be provided primarily from
our Irvine office with support from our other offices, if needed. Cannon office locations include the following:

Irvine
16842 Von Karman Ave.

Suite 150
Irvine, CA 92606
( 949.753.8111
Ventura
305 S Kalorama St.

Suite A
Ventura, CA 93001
( 805.503.4590
Los Angeles
11900 W Olympic Blvd.

Suite 530
Los Angeles, CA 90064
( 310.664.1166
San Luis Obispo
1050 Southwood Dr.

San Luis Obispo, CA 93401
( 805.544.7407
Experience Counts
Cannon offe rs relevant expertise in the following areas:

Pavement Rehabilitation
Intersection and Signal
Improvements
Grading and Drainage
ADA Compliance
Complete Streets
Reports, Studies, and
Hydraulic Analyses
Read more about our relevant experience on pages 15-19.

Contact Information
Principal-in-Charge /
Contract Manager
Gary Solsona, PE, QSD
As previously mentioned, Mr. Solsona
will be the main point of contact
for the City. He brings 22 years of
experience. From his work on Artesia
Blvd Arterial Improvements, 170
th
Street Rehabilitation and Redondo
Beach Blvd Arterial Improvements, he is familiar with the City’s sta
ff
and standards.

Mr. Solsona can be reached at:
( 949.777.1580 * [email protected]
16842 Von Karman Ave., Suite 150
Irvine, CA 92606
As a full-service engineering, surveying, and construction management
fir
m, we take pride in our ability to offer
clients a broad range of services. Our commitment to
providing clients Reliable Responsive Solutions, whether the project scope is expansive or more specialized, spans 48 years. We have worked with many cities, agencies,
school districts, and counties to make streets safer and more pedestrian and bicycle-friendly, maintain secure and dependable water systems, and construct buildings and
facilities that are structurally sound.

Our team of more than 135 professionals includes
registered civil, structural, electrical, and mechanical engineers; licensed land surveyors; automation and SCADA system specialists; and Caltrans certi
fied c
onstruction
managers and inspectors.

Cannon has strong experience in the preparation of
engineering documents for the phases of design and
construction including: conceptual design, preliminary
design, final engineering, construction support, and
construction documents. We have specialists in street
rehabilitation, drainage design, sewer design, and roadway design; water resources, hydrology and hydraulics; water utilities, sewer and dry utilities; resource coordination; and construction scheduling and inspections.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 6 CannonCity of Gardena, On-Call Civil Services
Cannon’s Canons
Cannon has principles, otherwise known as Cannon’s “Canons,” that are simply how we do business.

Two to Four, Never More: While it is not always possible to be available by phone, we pledge to return voice, email, and text messages within four hours.

Think Ahead: We are proactive, preemptive, and prepared.

We keep clients informed and provide updates before they call looking for them.

Be Reliable: We communicate with our clients and
teammates what we are going to do and then get it done.

Stand on the Shoulders of Others: We strive
to improve our operations system by using templates,
procedures, and what has worked in the past.

FIRM STATISTICS
200+
years of design
experience
100+
cumulative years
of on-call contracts
professional
engineers
40+48
years in
business
Since 1976, Cannon has been committed to providing engineering services. Our reputation is a direct result of our consistent attention to our clients’ needs. Eighty percent of our firm’s business is from repeat clients who trust in our integrity, as well as our professional competence. We have the expertise, experience, and capabilities to meet your needs as demonstrated in the qualifications and experience detailed in this proposal. However, the real proof of this expertise is found in what our past and current clients have to say:

David Gould, PE, District Engineer, Crescenta Valley Water District The projects that Cannon worked on for CVWD were on time and within budget. I have been pleased with the services provided by Cannon. I’ve found their personnel to be extremely thorough, diligent, and knowledgeable. I’d recommend their engineering consulting services without hesitation.

Chris Dejarme, PE, Senior Civil Engineer, City of Ventura I’ve found [Cannon’s] engineers to be extremely professional, diligent, and knowledgeable. I have been pleased with the services provided by Cannon and trust their knowledge and expertise in supporting Ventura with the City’s capital improvements.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 7 CannonCity of Gardena, On-Call Civil Services
Producing Deliverables Free of Errors
Our firm consistently meets project schedules and controls costs through planning, advanced project management tools, and rigorous cost estimation processes. With a 95% on-time completion rate and an average cost variance of less than 5%, we utilize the Deltek Vision Management System for detailed accounting and project management, enabling precise tracking of labor, subconsultant, and direct costs. This system supports Earned Value Analysis (EVA) for regular comparisons of actual costs to planned costs and completed work.

Our cost control management includes tracking project costs, managing Contract Change Orders (CCO), generating detailed monthly pay estimates, and confirming clear documentation and measurement of item work before payment.

Our engineer’s estimates are typically within -15% to +15% during the detailed design phase, validated by parametric risk models and aligned with industry best practices. This comprehensive approach confirms efficient project management and cost control, considering previous projects, inflation, and factors contributing to the final cost.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 8 CannonCity of Gardena, On-Call Civil Services
Cannon’s Subconsultants
Iteris, Inc. (Iteris) is the market leader in smart mobility infrastructure management since 1987. Iteris’ 460+ staff
have decades of expertise
in traffic management, along with superior services and patented products that help detect, measure, and manage traffic and vehicular performance, minimize traffic congestion, enhance safety, and empower Iteris clients with solutions to better manage their transportation networks.

Iteris team members are experts in the fields of transportation planning, traffic engineering, and ITS. Knowledge of these practice areas enables Iteris to provide comprehensive services ranging from initial traffic impact studies, transportation modeling, planning, systems engineering, and detailed design, through implementation and performance measurement/ monitoring. Iteris combines the knowledge of transportation engineers, systems engineers, system integrators, software engineers, and transportation planners to o
ffe
r an unmatched combination of talent and experience. Iteris combines the knowledge of transportation engineers, systems engineers, system integrators, software engineers, and transportation planners to o
ffe
r an unmatched combination of talent and experience. This allows your team’s design to be informed by a hands-on integration experience of robust network communication systems.

Firm Information:
•
DIR number: 1000014053
•
T
ype of organization: Publicly Traded Corporation
(NASDAQ: ITI)
•
Firm siz
e: 460+
•
Ser
vices o
ffer
ed: Transportation planning, traffic
engineering, and ITS
Firm Address:
•
1700 Carnegie A
venue,
Suite 100, Santa Ana, CA
92705
Relevant Projects with Cannon:
•
Art
esia Boulevard Arterial Improvement Project, City of
Gardena
•
R
edondo Beach Blvd Arterial Improvement Project,
City of Gardena
•
Lak
eview Avenue Improvement Project, Phase II, City
of Yorba Linda
•
PS&E Ser
vices for CIP 2018-11 ATP Cycle IV, City of
Huntington Park
Epic Land Solutions, Inc. (EPIC) is a full-service real property and right-of-way services consultant whose purpose is to plan, acquire, and manage real property interests needed to construct and maintain infrastructure facilities. For over 24 years, EPIC has performed right-of-way acquisition services for local public agencies, utilities, design engineers, and environmental companies across Southern California.

With 60 sta
ff
employed firm-wide, EPIC manages projects locally from regional offices in Los Angeles, Riverside, and San Diego. EPIC is unique among right-of-way consultants by employing real estate appraisers, GIS analysts, and a dedicated utility coordination team in-house to provide maximized real estate intelligence and limited third party involvement.

EPIC helps clients understand and abide by local, state, and federal regulations that guide the entire right-of-way process, including the federal Uniform Relocation Assistance and Real Property Acquisition Act of 1970 (URA) and Uniform Standards of Professional Appraisal Practice (USPAP).

History Working with Local Agencies
EPIC has provided on-call real estate consulting services for various municipalities and public agencies throughout Southern California, including Los Angeles County. As an experienced on-call consultant, we are eager to support the City of Gardena with as needed right-of-way services. EPIC is currently performing on-call right of way services for the Cities of Montclair, Inglewood, Anaheim, Riverside, Murrieta, Santa Ana, and the City of Irvine, to name a few.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 9 CannonCity of Gardena, On-Call Civil Services
Cannon’s Subconsultants
LOR Geotechnical Group, Inc. (LOR), is a Certified Small business (SBE) and a multi-disciplined geotechnical engineering and consulting firm providing sound solutions and innovative strategies in the geotechnical engineering, geologic, environmental, and special inspection fields for clients since 1988.

LOR provides a comprehensive organization of qualified personnel to support the technical needs of this project. This firm has provided geotechnical engineering services for over three thousand projects within southern California.

LOR’s laboratory is currently approved by the California Department of Transportation (Caltrans). LOR’s field and laboratory personnel are Caltrans, International Code Council (ICC), American Concrete Institute (ACI), and American Construction Institute Association (ACIA) certified.

Firm Information:
•
DIR number: 1000047292
•
T
ype of organization: Soils Engineering
•
Firm siz
e: 12
•
Ser
vices o
ffer
ed: Geotechnical
•
Number of pr
ojects with Cannon: 200+
Relevant Projects with Cannon:
•
R
eport Reviews for the Cities of Fullerton, Santa Ana,
and Chino California.
•
P
avement Design, Vermont Street Rehab, City of
Gardena, California
Firm Address:
6121 Quail Valley Court, Riverside, CA 92507
BGB Design Group (BGB) a Costa Mesa based landscape
architectural/planning firm incorporated in 1999, has collaborated on the following projects with Cannon Corporation, Artesia Blvd., Manhattan Beach Blvd., Gibson Mariposa Skate Park, Redondo Beach Blvd. Additional Public works projects include the University Drive Widening Project for the City of Irvine, Esplanade Avenue Streetscape Improvements (APWA Award 2011) and Redondo Beach Pier resurfacing project for the City of Redondo Beach, Kern River Upland and River Edge Restoration project for the City of Bakersfield, the Yorba Linda Town Center and the Crystal Cove for the Crystal Cove Conservatory, Coast Highway, Jamboree Medians and currently Newport Blvd. Streetscape for the City of Newport Beach. As evidence of its capabilities, BGB was awarded the American Society of Landscape Architects Centennial Medallion Award in 1999 for Avalon’s Waterfront Redevelopment Design and Plan; the extent of which stretched the length of the Crescent from the Catalina ferry docks to the Casino. Additionally, BGB was awarded an APWA and ASLA Merit award for the Railroad Corridor Pedestrian Beach Trail Project that extends the length of the City of San Clemente. BGB has been retained by the cities of Anaheim, Fullerton, Gardena, Newport Beach, and Rancho Santa Margarita as “on-call” landscape architects.

Firm Information:
•
DIR number: 1000020720
•
T
ype of organization: S Corporation
•
Firm siz
e: 7
•
Ser
vices o
ffer
ed: Landscape architecture and irrigation
Diversity Certifications:
•
SB (Micr
o) #1156782
Firm Address:
•
3185 – C1 Air
way
Avenue, Costa Mesa, CA
92626
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 10 CannonCity of Gardena, On-Call Civil Services
Cannon’s Subconsultants
AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Their team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed their clients’ expectations.

Below is a partial list of professional services o
ffe
red to the Public Agencies.
•
Pr
epare project funding applications for Local, State-aid and Federal-aid program projects •
Pr
epare federal-aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
•
Pr
epare environmental “PES” forms for federal-aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
•
Pr
epare Initial Site Assessment (ISA) reports
•
Pr
epare Right-of-Way (ROW) Certifications
•
Pr
epare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
•
Pr
epare Quality Assurance Program (QAP) in compliance with Caltrans requirements •
Pr
epare “Contract Award Packages” for Federal-aid and State-aid projects •
Pr
epare progress and final reimbursement requests for Federal, State and Local Measure funded projects •
Pr
epare CTC Vote Allocation packages for STIP funded projects •
Pr
epare final closing reports for Grant funded projects
•
P
roject management and coordination services for planning, design, right-of-way, and construction phases •
C
oordinate permit process with Caltrans and other regulating agencies •
C
ivil and structural design of public works projects including retaining walls and special structures •
C
onstruction administration/management and project closing •
A
ssist Agencies with project audits
AAKKAALL CCoonnssuullttaannttss
Project Services
AKAL Consultants (dba of AAHK, Inc – a California Corporation) 34 Monserrat Place, Foothill Ranch, CA 92610 Phone: (949) 586-1006

Brief Description of Available Professional Services

AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Our team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed our clients’ expectations.

Given below is a partial list of professional services offered to the Public Agencies.

• Prepare project funding applications for Local, State-aid and Federal-aid program projects • Prepare federal- aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
• Prepare environmental "PES" forms for federal -aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
• Prepare Initial Site Assessment (ISA) reports
• Prepare Right-of-Way (ROW) Certifications
• Prepare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
• Prepare Quality Assurance Program (QAP) in compliance with Caltrans requirements • Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects
• Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right- of-way, and construction phases
• Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures
• Construction administration/management and project closing • Assist Agencies with project audits

These services can be provided at a fixed price or on a “time and material” basis. AKAL Consultants is always looking for efficient ways to do business and successful completion of our clients’ projects.

AKAL Consultants
Kanwal J. Singh, M.S., P.E.

Principal Engineer
Office: (949) 586-1006
Cell: (949) 293-1487
Email: [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 11 CannonCity of Gardena, On-Call Civil Services
Familiarity of Regional Grants / Competitive Funds
Cannon’s approach to grant funding reflects a comprehensive understanding of the funding landscape, focusing on providing the technical support necessary to help projects remain compliant with the funder’s requirements and avoid claw-backs. Additionally, Cannon can enhance the grant application process by providing technical analyses that significantly improve the quality of grant proposals. We have produced a variety of technical studies that can strengthen the impact and competitiveness of many grant proposals, making them more persuasive and increasing their chances of success in competitive funding situations.

The following table provides a summary of our firm’s successful history of grant applications.

Summary of Funding Administration Project Experience Cannon www.cannoncorp.us
Federal State CDBG FEMA
City of Paso Robles Theatre Drive Realignment ARRA $2.86 million In Progress Construction, Close-Out Miscellaneous Projects, 1998, 2000, 2002 STIP STIP various 1998-2002 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Dinosaur Caves Park Street Improvements STIP $163,000.00 2003 Authorization ITS Projects ITS $180,000.00 2005 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Promenade IV HPP

TE STIP-TE
$1.2 million 2007 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Beachcomber Stairs LWCF $210,000.00 2009 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Fourth Street Improvement STIP $473,000.00 2009 Close-Out Promenade IVB ARRA

HPP STIP-TE
$1.6 million 2011 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Price Canyon Road Improvements TEA $213,000.00 2006 Authorization, PS&E Certification, Award Package El Moro Bikeway TEA $219,996.00 2006 Award Package
Santa Ysabel Improvements - Los Osos TEA $229,443.00 2006 Authorization, PS&E Certification, Award Package San Miguel Streetscape TEA $280,000.00 2006 Authorization, PS&E Certification Main Street (Cambria) Improvement Project TEA $243,457.00 2005 Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Price Canyon Road Improvements HPP

HBP STIP
$4.1 million 2010 Authorization
Willow Road Extension / 101 Interchange SLPP $2 million 2010 Application, Authorization Hutton Road Improvements HSIP $531,000.00 2011 Authorization, Design, Environmental, Right of Way, Bidding/Award Lopez Drive Bridge HBP $160,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction Mgmt, Close-Out
Atascadero Lake Park Walkway TEA $169,000.00 2003 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Garcia Road Bridge HBP $794,645.00 2003 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Santa Ysabel Road Rehabilitation STIP $318,000.00 2003 Authorization, Construction, Grant Reimbursements, Close-Out Santa Cruz Road Rehabilitation STIP $264,000.00 2003 Grant Reimbursements, Close-Out El Camino Real Traffic Signals ITS STIP $384,000.00 2003 Close-Out El Camino Real Enhancement STIP $298,000.00 2004 Grant Reimbursements, Close-Out La Linia Street Rehabilitation CDBG $200,000.00 2004 Design, Bidding/Award, Construction Los Osos Road Culvert Replacement CDBG n/a 2005 Permits Atascadero Lake Park Restroom Replacement CDBG $215,662.00 2006 Design, Bidding/Award, Construction Atascadero Creek Bank Restoration n/a 2006 Contract Administration Lewis Avenue Bridge TCSP $220,000.00 2008 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, San Gabriel Road - Safe Route to Schools (SRTS) SR2S $383,400.00 2010 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, City of Grover Beach W. Grand Avenue STIP-TE $600,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction Mgmt, Grant Reimbursements, Close-Out
City of Guadalupe Guadalupe Street (Route 1) HPP $351,814.00 2012 Authorization, Design, Bidding/Award, Construction, Grant Reimbursements, Close-Out Highway 1 Corridor Coastal Management Plan NSB $24,000.00 2011 Authorization, Close-Out, Contract Administration Highway 1 Corridor Gateway Monuments NSB $304,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out Highway 1 Corridor Interpretive Signs NSB $312,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out Highway 1 Coastal Trail Plan NSB $350,000.00 2012 Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out California Polytechnic Gilardi Road Bridge Replacement HBP $717,093.00 In Progress Application, Authorization, Close-Out Cuesta Community
College
Hollister Road Bridge Replacement HBP

Cal EMA $3.4 million 2011 Construction, Grant Reimbursements, Close-Out Federal - FHWA:

City of Pismo Beach
Timeline (year
completed)
Phase In Which Services Were Provided Funding Source(s)Agency Project Grant Amount
TE = Transportation Enhancement
San Luis Obispo
Council of
Governments
LWCF = Land and Water Conservation
CDBG = Community Development Block
County of San Luis
Obispo
City of Atascadero
HPP = High Priority Projects
HSIP = Highway Safety Improvement Program
SRTS = Safe Routes to School (Federal)
ARRA = American Recovery and Reinvestment Act
ER = Emergency Relief
California Transportation Commission:

SLPP = State and Local Partnership Program
STIP = State Transportation Improvement Program
EEM = Environmental Enhancement Mitigation
SR2S = Safe Routes to School (State)
STIP = State Transportation Improvement Program
TCSP = Transportation & Community &
NSB = National Scenic Byways
ITS = Intelligent Transportation Systems
HBP = Highway Bridge Program
Prop 1B = State-Local Partnership Program
State of California:

Page 1 of 1 ends

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 12 CannonCity of Gardena, On-Call Civil Services
Personnel and Experience
22 Experience Working with Public Agencies / Authorities Cannon has had the opportunity to build professional relationships with many cities, counties, and local agency representatives throughout California. The following select list presents a summary of the municipal entities we have worked with recently:
•
City of Gar
dena
•
City of Los Ang
eles
•
Coun
ty of Los Angeles
Department of Public Works
•
Los Ang
eles Community College
District
•
P
ort of Long Beach
•
City of Glendale
•
City of Diamond Bar
•
City of Manha
ttan Beach
•
City of Ir
vine
•
Ir
vine Ranch Water District
•
City of Anaheim
•
City of San
ta Ana
•
City of Fullert
on
•
City of Lak
e Forest
•
City of Gar
den Grove
•
City of Hun
tington Park
•
San
ta Clarita Water District
•
Ne
whall County Water District
•
City of South P
asadena
•
City of San
ta Fe Springs
•
City of R
edondo Beach
•
City of Rancho P
alos Verdes
•
City of P
omona
•
City of Pic
o Rivera
•
City of San
ta Monica
•
City of El Mon
te
•
City of Menif
ee
•
City of Mor
eno Valley
•
Coun
ty of Riverside EDA
•
Coun
ty of San Bernardino
•
City of Chino
•
City of Arr
oyo Grande
•
City of A
tascadero
•
City of Bak
ersfield
•
City of Be
verly Hills
•
City of Buellt
on
•
City of Carpin
teria
•
City of Delano
•
City of Gole
ta
•
City of Gonz
ales
•
City of Gr
over Beach
•
City of Guadalupe
•
City of Heme
t
•
City of Lanc
aster
•
City of Lompoc
•
City of L
ynwood
•
City of McF
arland
•
City of Mon
terey
•
City of Morr
o Bay
•
City of P
aso Robles
•
City of Pismo Beach
•
City of Salinas
•
City of San Luis Obispo
•
City of San
ta Maria
•
City of Simi V
alley
•
City of Soledad
•
City of Solv
ang
•
City of V
entura
•
City of V
ernon
•
Coun
ty of San Luis Obispo
•
Coun
ty of Kern
•
Coun
ty of Santa Barbara
•
Or
ange County Public Works
•
San
ta Ynez Community Services
District
•
Nipomo Community Ser
vices
District
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 13 CannonCity of Gardena, On-Call Civil Services
Project
Spotlight Matrix
Project Name
Services Provided
Drainage Design
Grading Design
Roadway Design
ADA Design and
Assessment
Water Quality / SWPPP
Technical Specifications
Engineer’s Cost
Estimates
Artesia Blvd. Arterial Improvements,
Gardena, California     
Rowley Park Restroom project
Gardena, California   
170
th Street Improvements,
Gardena, California      
Redondo Beach Blvd Arterial Improvements,
Redondo Beach California     
Rio Vista Street Pavement Rehabilitation,
Anaheim, California       
Cerritos Avenue Sidewalk Gap Closure,
Anaheim, California      
Modjeska Park Storm Water Detention,
Anaheim, California      
Jamboree Main Intersection Improvements,
Irvine, California       
San Juan Street Reconstruction,
Fullerton, California     
Concrete Pavement Reconstruction,
Newport Beach, California       
Lakeview Avenue Widening,
Yorba Linda, California       
Pedestrian Access Curb Ramps,
Long Beach, California     
ADA Ramp Improvements,
Lake Forest, California    
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 14 CannonCity of Gardena, On-Call Civil Services
Organization Chart
33 Organizational Chart
We have selected key staff who are not only experts in their respective disciplines but also have extensive experience collaborating on similar projects. This high level of expertise has allowed our team to fine-tune our collaboration and coordination, contributing to the successful completion of projects that are on time and within budget. Our team will be led by Gary Solsona, PE, QSD, as Principal-in-Charge and Contract Manager. 🔑 Key Personnel
*Subconsultant
City of Gardena
Principal-in-Charge /
Contract Manager
Main point of contact
🔑 Gary Solsona, PE, QSD
QA / QC Manager
Larry Kraemer, PE

GEOTECHNICAL TRAFFIC LANDSCAPE

ARCHITECT
🔑 John Leuer,
GE, CE
*LOR
🔑 Paul Frislie

PE, IMSA
*Iteris
🔑 Arthur Guy,

ASLA, CLIA
*BGB

FUNDING

SPECIALIST

RIGHT-OF-WAY

ACQUISITIONS
🔑 Kanwal Singh, PE
*AKAL
🔑 Addiel Flores, RWA
*Epic Land Solutions

CIVIL DESIGN
🔑 Gary Solsona, PE, QSD
🔑 Marco Canta, PE
Anthony Severy PE
Andy Rowe, PE
John Evans, PE
Karena Diep, EIT
Kaitlin Grabiec, EIT
Foster Campbell, EIT
Ally Marnocha, EIT
Nick Settevendemie, EIT
Cannon
130+ support staff

WATER RESOURCES
🔑 Mike Kielborn, PE, LEED AP
Gary Roepke, PE
Tina Kuah, PE

CM & INSPECTION
🔑 Patrick Riddell, PE,

CPII, QSD/P
Matt Natividad, CPII

SURVEYING
Ned Reynolds, PLS
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 15 CannonCity of Gardena, On-Call Civil Services
Similar Projects/Services
44 City of Gardena, California
Artesia Boulevard Arterial Improvements
The City of Gardena (City) wanted to replace existing medians along Artesia Boulevard, from Western Avenue to Vermont Avenue, with a new decorative hardscape paving solution. Based on prior discussions with City sta
ff, t
he Cannon team (including our subconsultant, BGB) evaluated and presented four paving solutions to the City: 1. grouted river cobble;

2. exposed concrete; 3. concrete unit pavers; and 4. staining/sealing the existing stamped concrete. The City subsequently decided to move forward with the cobblestone paving solution, which Cannon incorporated into the final design plans, specifications, and cost estimate.

Our team prepared a design study (exhibit) to convey the proposed limits of added or deducted hardscape for City direction. Following approval of the conceptual design direction, we completed revisions to the previously submitted 95% design plans, specifications and estimate (PS&E). This consisted of the street improvement plans and landscape demolition plan, irrigation plan, planting plan, technical specifications, and cost estimate. •
Cannon’
s Subconsultant: BGB
170th Street Improvements
Cannon successfully completed the 170th Street Improvement Project in Gardena, spanning 0.50 miles from Normandie Avenue to Vermont Avenue.

Funded partly by $500,000 from the Federal Surface Transportation Program, the project focused on enhancing street drivability and aesthetics.

Key accomplishments included rehabilitating asphalt concrete pavement, repairing concrete curbs and sidewalks, upgrading curb ramps to ADA standards, and installing a traffic signal system battery backup at a major intersection. Cannon’s role encompassed preparing construction plans, specifications, cost estimates, and handling the E-76 Authorization documentation, culminating in a project that met the City of Gardena’s safety and accessibility standards. This project included a geotechnical subconsultant that Cannon managed.
•
Funded partly b
y Federal Surface Transportation Program
Reference: William Mendoza
Associate Engineer
City of Gardena
1717 West 162
nd Street
Gardena, CA 90247
(
310.217.9676
*
[email protected]
Project Dates: March 2019 - June
2024
Key Project Team Members
• G ary Solsona, PE, QSD Project Manager
•
K
arena Diep, EIT Design Engineer
•
P
aul Frislie,PE (Iteris), Traffic Engineer
•
A
rt Guy (BGB), Landscape Architect
Key Project Team Members
• G ary Solsona, PE, QSD Project Manager
•
K
arena Diep, EIT Design Engineer
•
K
anwal Singh (AKAL), Federal E-76 Processing
Project Dates: March 2019 -
December 2022
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 16 CannonCity of Gardena, On-Call Civil Services
City of Gardena, California
Redondo Beach Boulevard Arterial Improvements
The City of Gardena Public Works Department (City) retained the professional engineering services of Cannon to provide PS&E design services for the Redondo Beach Blvd Arterial Improvements Project from Crenshaw Blvd. to Vermont Ave., approximately 1.9 miles in length. The project improvements propose to improve safety, access, and corridor traffic operations by modifying the existing raised medians and installing new raised medians to replace the existing two-way left turn medians, extend left turn pockets, and improve traffic channelization. Other components related to the design of the corridor include pavement reconstruction / rehabilitation, addition of bulb-outs (which require evaluating existing drainage systems), upgrading existing curb ramps to ADA compliance, upgrades to the traffic signal system.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 17 CannonCity of Gardena, On-Call Civil Services
City of Fullerton, California
San Juan Street Reconstruction Project
The City of Fullerton needed to complete street, water, and sewer improvements along seven streets within the San Juan Community.

Improvements consisted of pavement reconstruction via full depth reclamation with cement; reconstruction of raised median (due to upheaving of tree roots); repair of broken/damaged portland cement concrete curb and gutter (rolled and standard); cross-gutters and driveway aprons; replacement and upsizing of existing water mains to 8” PVC; reconnecting existing water services; and removal and replacement of the existing 8” VCP sewer main.

Cannon provided civil engineering design services for plans, specifications, and estimate (PS&E) construction documents. The Cannon Team also provided topographic survey, geotechnical investigation, utility coordination, utility potholing services, and pre- and post-construction monumentation preservation services for the project. Survey services included topographic survey, cross sections, right-of-way establishment, construction staking, and monument perpetuation for one mile of residential streets.

Rancho-Verona Water Main Replacement
Cannon was selected to provide civil design to replace outdated 6” and 8” cast iron water mains in the Rancho Verona area, prior to performing street repairs. The need to replace the selected water mains resulted from age, condition, and capacity deficiencies of the existing water mains. The new pipeline provides a more reliable water supply to the community and better pressure and fire flow for the area. The length of the water mains replaced was 5,583 feet. The design included a new water main to be installed adjacent to existing water mains, and the old water mains to be abandoned once service laterals are tied over to the new line.
•
Pr
oject Dates: November 2022 - September 2023
Euclid and Rosecrans Water Main Rehabilitation
To prevent trenching on new pavement, the City of Fullerton is replacing water mains near Euclid Street and Rosecrans Avenue ahead of a nearby development, with the Developer repaving a
ffe
cted streets. This includes
upgrading 8-inch and 12-inch pipes with C900 PVC and rehabilitating a 24- inch main using trenchless CIPP technology, enhancing water supply and fire safety over 3,090 feet of new mains and 930 feet of rehabilitated mains. •
Pr
oject design completed: December 2023
Reference: David Grantham, PE
Principal Civil Engineer
City of Fullerton
303 W. Commonwealth Ave
Fullerton, CA 92832
( 714.738.6853
* david.grantham@
cityo
ffu
llerton.com
Project Dates: January 2018 -
December 2021
Key Project Team Members
• G ary Solsona, PE, QSD Project Manager
•
M
ike Kielborn, PE, Civil Engineer
Key Project Team Members
• M ike Kielborn, PE, Project Manager
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 18 CannonCity of Gardena, On-Call Civil Services
City of Anaheim, California
Modjeska Park Underground Storm Water Detention
and Infiltration System
Modjeska Park is an award-winning project that spans a 23.5-acre park in Anaheim, California. The City of Anaheim selected Cannon to engineer a solution to a multi-faceted problem. Extensive
flo
oding caused by an
under-sized storm drain line prompted an urgent local need for stormwater management. As part of Orange County’s larger Storm Water Resource Plan, the objectives were to protect and enhance regional water quality, manage stormwater runo
ff, a
nd increase local water supply.

The project involved installing an underground, pre-manufactured infiltration/ detention system; two laterals to divert dry weather flow and stormwater; and a stormwater diversion structure to divert flows from an existing 48-inch reinforced concrete storm drainpipe that drains the 224-acre contributing watershed. The system was designed to capture and infiltrate a minimum of 150 acre-feet per year of dry weather, urban runo
ff, a
nd first flush of storm
water to reduce pollutant discharge to the Bolsa Chica Channel.

Cerritos Avenue Sidewalk Gap Closure
Cannon provided civil engineering design, including plans, specifications, and estimates (PS&E), and survey services for this project located on Cerritos Avenue from Euclid Street to approximately 600 feet east of Euclid Street. The project consisted of constructing a five-foot wide, ADA compliant sidewalk adjoining the back of curb, with no parkway along the north and south sides. The work also included the construction of block walls and fences that were relocated and reconstructed as part of the project. The new sidewalk eliminated the need for pedestrians to walk along the side of the road or on a dirt path.

Cerritos was designed as a four-lane secondary arterial by the County’s Master Plan of Arterial Highways (MPAH) with average daily traffic of 9,400 vehicles per day. The sidewalk along Cerritos east of Euclid Street ended abruptly. The existing pathway consisted of an unpaved dirt path. The sudden sidewalk gap was a challenge for the drivers, pedestrians, bicyclists, and students of Loara High School located on the northwest corner of the Euclid and Cerritos. This sidewalk project provides enhanced safety and improved access for the school children and pedestrians in general. Cannon’s services included right-of-way acquisition and Phase I ESA.

Reference: Bill Grigsby, PE
Principal Civil Engineer
City of Anaheim
200 South Anaheim Blvd., Ste. 276,
Anaheim, CA 92805
( 714.765.5259
* [email protected]
2020 SoCal Project of
the Year
2020 Water Project
of the Year, Orange
County Branch
Key Project Team Members
• G ary Solsona, PE, QSD Project Manager
•
A
nthony Severy, PE Civil Engineer
Key Project Team Members
• G ary Solsona, PE, QSD Project Manage r
Project Dates: March 2021 -
November 2021
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 19 CannonCity of Gardena, On-Call Civil Services
City of Irvine, California
Jamboree Main Intersection Improvement
Strategically located in the heart of southern California, between Los Angeles and San Diego, Irvine is surrounded by major freeways. It holds more than 26,000 business licenses, Irvine delivers the benefits of connectedness, proximity, and customer accessibility. To continue to provide the necessary traffic flow, this project was designed to improve the intersection of Jamboree Road and Main Street to mitigate the future deficient level of service (LOS) by adding a fifth northbound and a fifth southbound lane on Jamboree Road, between the I-405 northbound on/o ff

ramps and Kelvin Avenue. The improvements were designed to meet current City, State, and Federal standards.

Due to right-of-way constraints, sidewalk widths north of Main Street were less than recommended by the IBC Vision Plan design guidelines (IBC recommends an 8’ parkway and 8’ sidewalk width, proposed improvements are no parkway and 6’ to 8’ sidewalk widths). Any non-standard features required approval by the City’s Planning Department during final design.

This project included professional engineering services for the preparation of construction contract documents, including the following:
•
Str
eet improvement plan and
profile
•
AD
A sidewalk and curb ramp
design
•
St
orm drain and flood control
channel modifications
•
Righ
t-of-way engineering
(title reports, mapping & legal
descriptions, ROW acquisition
maps)
•
R
etaining wall plan / profile
•
E
arthwork grading plans
•
Landsc
ape planting / irrigation
plans
•
Cons
truction details
•
T
raffic signal modification
•
Striping / signing plans
•
T
raffic stage construction plans
•
W
et and dry utility coordination /
mapping
•
Hy
drology and hydraulics
•
W

QMP / SWPPP
•
IR
WD water facility design
•
En
vironmental compliance and
water quality documentation
•
Specific
ations and construction
cost estimates
Year Completed: October 2019
Reference: Steve Sherwood, PE
Assistant City Engineer
City of Irvine
One Civic Center Plaza, Irvine,
CA 92623
(
949.724.7327
*
[email protected]
Key Project Team Members
• G ary Solsona, PE, QSD Project Manager
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 20 CannonCity of Gardena, On-Call Civil Services
Quality Assurance/Quality Control Process
Cannon is committed to providing the City with the best possible product, on schedule and within budget. To accomplish this, we use a Quality Assurance/ Quality Control (QA/QC) Program that is organized to accommodate the specific needs and requirements of each task order. Our QA/QC manager for this contract is Mr. Larry Kraemer, PE. Cannon’s QA/QC program is generally divided into three phases:

1. D
esign Team Review. This review is provided by members of the project team as the work progresses. Prior to the start of design work, an analysis is made to determine the technical requirements, needs, and requirements of the Client; jurisdictional requirements; and fiscal constraints or schedule requirements of the project. At this time, specific quality control requirements and internal review procedures are established.

2. In
dependent Peer Review. This review is conducted at various project phases preliminary, 60%, and 100% by design personnel who are outside of the regular project design team. Peer review consists of a detailed review of project work products. This process involves the assignment of senior personnel, including principals, to provide detailed, independent reviews of the work being completed. The selection of senior personnel for this task is based on professional expertise, specific knowledge of similar projects, and years of experience. The detail reviewer’s responsibility will include: evaluation of the overall project concept at preliminary phase; verification of the adequacy of the design to achieve the project goals; evaluation of possible design alternatives; review of QA/QC by the design team; review of the project for constructability; and contractor review. Recommendations made by the independent reviewer are made directly to the project manager, who is responsible for evaluating the recommendations and implementing changes, as required. The reviewer’s comments will be documented and recorded along with the designer and project manager’s response to comments.

3. R
eview of Subconsultant Deliverables: This review is conducted by Cannon’s project manager because of their knowledge of the entire project’s scope and how each discipline relates to each other. This review is also conducted at various project phases, including the preliminary, 60%, and 100% and will be done prior to submitting the complete deliverable to the City. This review includes: evaluation of the overall project concept at preliminary phase; verification of the adequacy of the design to achieve the project goals; evaluation of possible design alternatives; and review of the project for constructability. After receipt of review comments, the subconsultant incorporates the comments or provides justification for a di ffe
rent design direction. The subconsultant then provides
revised plans to the project manager along with the original comments and proper responses that follows our QA/ QC plan format.

Accurate Coordination of Subconsultants
Cannon has extensive experience in accurately coordinating subconsultants, having worked with 100+ firms. From project onset, each subconsultant is integrated into our Quality Assurance/Quality Control (QA/QC) process making them fully vested and accountable members of the Cannon Team. Regular coordination meetings and a comprehensive project management system help us maintain alignment and address issues promptly, resulting in seamless project execution. Cannon’s QA/QC Process is detailed below.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 21 CannonCity of Gardena, On-Call Civil Services
References
55 Reference: David Grantham, PE
Principal Civil Engineer
City of Fullerton
303 W. Commonwealth Ave
Fullerton, CA 92832
( 714.738.6853
* david.grantham@cityo
ffull
erton.com
Reference: Bill Grigsby, PE
Principal Civil Engineer
City of Anaheim
200 South Anaheim Blvd., Ste. 276
Anaheim, CA 92805
( 714.765.5259
* [email protected]
Reference: Steve Sherwood, PE
Assistant City Engineer
City of Irvine
One Civic Center Plaza
Irvine, CA 92623
(
949.724.7327
*
[email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 22 CannonCity of Gardena, On-Call Civil Services
Fee Schedule
66 2024/2025 Fee Schedule
Bill Rate Ranges
Subject to change
Assistant Resident Engineer I - II 155$ - 205$ Project Designer 125$ - 179$ Associate Engineer 180$ - 240$ Project Engineer 153$ - 205$ Associate Land Surveyor 210$ - 230$ Resident Engineer 195$ - 248$ Associate Landscape Architect 175$ - 215$ Sr. Associate Architect 219$ - 260$ Automation Specialist 165$ - 210$ Sr. Associate Engineer 180$ - 265$ Automation Technician 130$ - 165$ Sr. Automation Specialist 185$ - 225$ CAD Tech 115$ - 140$ Sr. Automation Technician 150$ - 185$ CAD Manager 130$ - 165$ Sr. CAD Tech 130$ - 160$ Construction Coordinator I - II 125$ - 160$ Sr. Construction Manager 217$ - 323$ Construction Inspector I - III 120$ - 200$ Sr. Consultant / Principal-in-Charge 285$ - 385$ Construction Manager 178$ - 235$ Sr. Land Surveyor 230$ - 275$ Design Engineer 150$ - 195$ Sr. Landscape Architect 190$ - 230$ Director/ Department Manager 225$ - 310$ Sr. Plan Check Engineer 175$ - 228$ Dry Utilities Coordinator I - II 170$ - 200$ Sr. Principal Designer 145$ - 225$ Engineer Tech 120$ - 150$ Sr. Principal Engineer 225$ - 320$ Engineering Assistant I - II 115$ - 140$ Sr. Project Designer 135$ - 200$ Grant Funding Manager I - II 160$ - 225$ Sr. Project Engineer 165$ - 225$ I&E Services Coordinator 120$ - 140$ Sr. Resident Engineer 205$ - 258$ Information Systems Admin/Manager 135$ - 168$ Survey Assistant 115$ - 145$ Land Surveyor 195$ - 230$ Survey Technician I - V 143$ - 218$ Landscape Architect 130$ - 200$ Technical Writer I - IV 115$ - 140$ Landscape Designer I - II 120$ - 142$
Lead Automation Specialist 175$ - 209$ Survey Crew Rates - Regular Lead Automation Technician 135$ - 170$ One-Man Field 210$ - 233$ Lead Designer 140$ - 180$ Two-Man Field 303$ - 319$ Office Engineer / Document Control I-III 115$ - 164$ Three-Man Field 399$ - 418$ Plan Check Engineer I - II 140$ - 198$ Two-Man - HDS 348$ - 367$ Planner I - III 130$ - 175$
Planning Assistant 115$ - 150$ Survey Crew Rates - Prevailing Wage Principal Automation Specialist 186$ - 232$ One-Man Field 270$ - 290$ Principal Construction Engineer 210$ - 293$ Two-Man Field 389$ - 412$ Principal Designer 140$ - 200$ Three-Man Field 549$ - 571$ Principal Engineer 200$ - 290$
Electrical - Prevailing Wage
Other Direct Charges Electrician 207$ - 254$
Black Line Plots $2.00 per page
Outside Reproduction Cost + 15% Building and Construction Inspector - Prevailing Wage Mylar Plots $12.00 per sheet BCI Construction Inspector 169$ - 201$ Automation & Electrical Materials Cost + 25% (+tax) Forensics Engineering / Expert Testimony Fee Schedule Available Upon Request.

Subconsultant Fees Cost + 15%
Technology Fee $30/Day
Color Plots $5.00 per page
Travel and Related Subsistence Cost + 15%
Standard Mileage Rate IRS Rate per mile
Airplane Mileage Rate GSA Rate per mile
(effective 7/1/2024)
Expenses, such as special equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%. If the client requests, or the client’s schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as weekends, and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided outside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the client requests field services to be provided on any given Sunday, a multiplier of 2.0 will be applied to the stated rates; on or around an observed holiday, other rates may be applied. Survey Crews and Automation Field staff are billed portal to portal. A minimum charge of four hours will be charged for any Automation Field Service calls outside of normal working hours. The stated rates are subject to change, typically on an annual basis.

Fee Schedule will remain fixed throughout
the initial term of the Agreement
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 23 CannonCity of Gardena, On-Call Civil Services


ZĂƚĞ^ĐŚĞĚƵůĞ͘

Billing Rate
STAFF CLASSIFICATION Min Max
Support Staff I $104 $136
Support Staff II $163 $222
Assistant Engineer/Planner $113 $155
Associate Engineer/Planner $135 $183
Engineer/Planner $140 $196
Senior Engineer/Planner I $195 $246
Senior Engineer/Planner II $228 $264
Lead Engineer/Senior Manager $236 $315
Associate Vice President/Principal/Director $258 $349
Vice President/Chief Scientist $343 $454

ŝůůŝŶŐZĂƚĞƐĞĨĨĞĐƚŝǀĞĨŽƌĨŝƌƐƚƚŚƌĞĞ;ϯͿĐŽŶƚƌĂĐƚLJĞĂƌƐ͘ dĂƐŬKƌĚĞƌƐǁŝůůƵƚŝůŝnjĞŝŶĚŝǀŝĚƵĂůƐƚĂĨĨƌĂƚĞƐĂƚƚŝŵĞŽĨ>ĞƚƚĞƌWƌŽƉŽƐĂůƐƵďŵŝƐƐŝŽŶ͕Ed DĂdžŝůůŝŶŐZĂƚĞƐ͘

ĞĨĂƵůƚ^ƚĂŶĚĂƌĚdĞƌŵƐĂŶĚŽŶĚŝƚŝŽŶƐ
• KƚŚĞƌĚŝƌĞĐƚĞdžƉĞŶƐĞƐƚŽďĞďŝůůĞĚĂƚĐŽƐƚ͕ƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶĞŐŽƚŝĂƚĞĚ͘ • DŝůĞĂŐĞƌĂƚĞƐǁŝůůďĞďĂƐĞĚƵƉŽŶĐƵƌƌĞŶƚ/Z^ƐƚĂŶĚĂƌĚƌĂƚĞƐ͘ Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 24 CannonCity of Gardena, On-Call Civil Services
Client: Cannon Corp
Agency: City of Gardena
Project: On‐Call Professional Services
Scope of Services: Right of Way Acquisition
Date submitted:  6/3/2024
Prepared by: C Sinclair
Title/Classification Hourly Billing Rates
Advisory Manager $210
Senior Project Manager $200
Project Manager $165
Assistant Project Manager $150
Senior Right of Way Agent $135
Right of Way Agent II $110
Right of Way Agent I $110
Project Coordinator $100
Budget & Financial Controls $185
Other Direct Costs Rate
Mileage At IRS Allowable
Postage/Overnight Delivery At Cost
Property Ownership and Tenant Data At Cost
Outside Services (Vendors & Subconsultants) At Cost
Appraisal Reports/Appraisal Review Certificates Fixed  Fee, At Cost Preliminary Title Reports Fixed Fee, At Cost
Staff billing rates provided do not include the Federal Acquisition Regulations (FAR) approved overhead rate for Epic Land Solutions, Inc. and are not suitable for state and federally funded projects.

If the NTP is received after 120 days from this proposal, fees and billing rates may require revision.
6/3/2024
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 25 CannonCity of Gardena, On-Call Civil Services

FEE SCHEDULE
OCTOBER 2023

SERVICES
Geotechnical Engineering
LOR Geotechnical Group, Inc. provides geotechnical engineering services, including: preliminary geotechnical investigations, foundation investigations, percolation feasibility investigations, liquefaction evaluation investigations, as well as grading observation materials testing services.

Geological
LOR Geotechnical Group, Inc. provides geological services, engineering geology investigations, seismic setting studies, slope stability investigations, liquefaction susceptibility investigations, hydrology/water resource studies, and bedrock rippability evaluations.

Environmental
LOR Geotechnical Group, Inc. provides, environmental site assessments, underground storage tank investigations and remediation investigations, groundwater monitoring systems, soil and groundwater sampling and analysis, and environmental studies for property transfers.

All costs for Geotechnical Engineering, Geological, and Environmental Services are based on the site and investigative parame ters requested.

FEES
The hourly personnel charges and laboratory test unit rates are as follows:

Personnel Charges-Hourly
Principal Engineer.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330.00 Project Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Staff Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Soil Technician/Deputy Inspector (Field or Laboratory) 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . $115.00 Soil Technician/Deputy Inspector (Prevailing Wage) 1, 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 Soil Technician/Deputy Inspector (CBA) 1, 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Traffic Control (Prevailing Wage) 1, 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135.00 Drafting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $105.00 Clerical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 Laboratory Testing Charges - Unit Costs
CT 202: Sieve Analysis (Soil). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120.00 CT 202: Sieve Analysis (Aggregate). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 202: #200 Sieve Wash. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $70.00 CT 205: Crushed Particle Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 206 Specific Gravity + Absorption of Coarse Aggregate. . . . . . . . . . . . . . . . . . . . . . . . . $125.00 CT 207: Specific Gravity + Absorption of Fine Aggregate.. . . . . . . . . . . . . . . . . . . . . . . . . . $165.00 CT 211: LA Rattler. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $275.00 CT 213: Organic Impurities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 CT 217: Sand Equivalent. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $130.00 CT 217: Sand Equivalent -QC.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 226: Moisture Content.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 227: Cleanness Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 229: Durability Index Fine/Coarse . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 235: Percentage of Flat and Elongated Particles in Coarse Aggregate. . . . . . . . . . . . . $110.00 CT 301: R-Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $385.00 CT 305: Swell. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $110.00 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 26 CannonCity of Gardena, On-Call Civil Services
CT 307: Moisture Vapor Susceptibility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 308 & CT 366: Asphalt Concrete Density & Stability/Rubberized. . . . . . . . . . . $240.00/$295.00 CT 308: Asphalt Concrete Density/Rubberized.. . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00/$210.00 CT 309: Asphalt Concrete Theoretical Maximum Density .. . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 329: Asphalt Moisture .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 366: Asphalt Concrete Stability/Rubberized. . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00/$275.00 CT 382: Asphalt Extraction & Gradation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 382: Slurry Extraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $175.00 CT 521: Concrete Cylinder Compressive Strength. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40.00 CT 523: Beam Cylinder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00 Concrete & Beam Cylinder Hold. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12.00 ASTM D6913/7928: Mechanical Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D1557: (Modified)/ ASTM D698: (Standard) Proctor (4"). . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D1557: (Modified)/ ASTM D698: Proctor (6" or Cal-216). . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D2434: Permeability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $440.00 ASTM D2435: Consolidation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265.00 ASTM D5333: Collapse Potential. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00 ASTM D2216: Moisture Content. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 ASTM D221/D2937: Moisture/Unit Weight (Ring). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45.00 ASTM D2974: Organic Matter Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 ASTM D4318: Atterberg Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D4829: Expansion Index. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D3080: Direct Shear.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295.00 CT 3910 Wet Track Abrasion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Soluble Sulfate: ( Test Kit SF-1).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 1 10% field supervision and equipment/vehicle charge will be added to all field services. 2 Rate based on current State determined prevailing wage rates as of the date of this document. Adjustments to our rates may be necessary based on the actual State determined prevailing wage rates at the time of our work.

TERMS
Reimbursable Expenses
Outside services performed by others and direct costs expended on the client's behalf are charged at cost plus twenty percent. These expenses include rental of drill rigs, bulldozers, backhoes, travel and subsistence, permits, reproduction costs, etc.

Travel Time
Travel time required to provide professional or technical services will be charged at the appropriate hourly rates.

Overtime
An overtime rate of 1.5 times the standard rate will be used for time in excess of 8 hours per day and Saturdays.

An overtime rate of 2.0 times the standard rate will be added for work on Sundays, official company holidays, and on all work in excess of 12 hours per day.

Prepayments
A retainer of fifty percent of the total fee is required for all field studies. The balance of the fee must be paid at the time the report is released to the client.

Billing
Billings will be provided periodically and will be classified by fee categories set forth above or as given by proposal.

Terms of Payment
Invoices rendered for professional services are due upon presentation. A service charge of 1.5 percent, per month, may be charged on accounts not paid within thirty days to cover additional processing and carrying costs. Any attorney's fees or other costs incurred in collecting any delinquent account will be paid by the client.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 27 CannonCity of Gardena, On-Call Civil Services

3185-C1 Airway Avenue Costa Mesa, CA USA 92626 +1 714 545 2898 www.bgb-inc.com 

June 5, 2024
City of Gardena, CA
Fee Proposal
On-Call Professional Landscape Architecture Services
RFQ

FEE SCHEDULE – BGB DESIGN GROUP

The following rates shall be in force for a minimum period of (3) calendar years.

Standard Hourly Rates

Principal / Senior Project Manager - Art Guy $180.00/hr.

Senior Principal – Bob Borthwick $180.00/hr.

Job Captain / Project Manager – Nicole Nguyen $140.00/hr.

Senior Landscape Designer – Cele Villa, Tony Escario $115.00/hr.

Administrative / Clerical – Stephanie Satterlee $ 75.00/hr.

The City would not be billed overtime rates for BGB staff time.

City review meetings and public presentations will be billed at standard hourly rates.

Reproduction and other approved reimbursable expenses will be billed at cost plus 15% overhead.

No mileage reimbursement is requested as a part of this proposal.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 28 CannonCity of Gardena, On-Call Civil Services
AAKKAALL CCoonnssuullttaannttss
Project Services
AKAL Consultants (dba of AAHK, Inc – a California Corporation) 34 Monserrat Place, Foothill Ranch, CA 92610 Phone: (949) 586-1006

Brief Description of Available Professional Services

AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Our team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed our clients’ expectations.

Given below is a partial list of professional services offered to the Public Agencies.

• Prepare project funding applications for Local, State-aid and Federal-aid program projects • Prepare federal- aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
• Prepare environmental "PES" forms for federal -aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
• Prepare Initial Site Assessment (ISA) reports
• Prepare Right-of-Way (ROW) Certifications
• Prepare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
• Prepare Quality Assurance Program (QAP) in compliance with Caltrans requirements • Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects
• Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right- of-way, and construction phases
• Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures
• Construction administration/management and project closing • Assist Agencies with project audits

These services can be provided at a fixed price or on a “time and material” basis. AKAL Consultants is always looking for efficient ways to do business and successful completion of our clients’ projects.

AKAL Consultants
Kanwal J. Singh, M.S., P.E.

Principal Engineer
Office: (949) 586-1006
Cell: (949) 293-1487
Email: [email protected]
Current hourly rate is $170/hr
AAKKAALL CCoonnssuullttaannttss
Project Services
AKAL Consultants (dba of AAHK, Inc – a California Corporation) 34 Monserrat Place, Foothill Ranch, CA 92610 Phone: (949) 586-1006

Brief Description of Available Professional Services

AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Our team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed our clients’ expectations.

Given below is a partial list of professional services offered to the Public Agencies.

• Prepare project funding applications for Local, State-aid and Federal-aid program projects • Prepare federal- aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
• Prepare environmental "PES" forms for federal -aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
• Prepare Initial Site Assessment (ISA) reports
• Prepare Right-of-Way (ROW) Certifications
• Prepare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
• Prepare Quality Assurance Program (QAP) in compliance with Caltrans requirements • Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects
• Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right- of-way, and construction phases
• Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures
• Construction administration/management and project closing • Assist Agencies with project audits

These services can be provided at a fixed price or on a “time and material” basis. AKAL Consultants is always looking for efficient ways to do business and successful completion of our clients’ projects.

AKAL Consultants
Kanwal J. Singh, M.S., P.E.

Principal Engineer
Office: (949) 586-1006
Cell: (949) 293-1487
Email: [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 29 CannonCity of Gardena, On-Call Civil Services
Resumes
77 Mr. Solsona has 22 years of civil engineering experience in public works design, consisting of award-winning roadway widening, street rehabilitation and intersection improvements; sound wall and retaining wall design, preparation of traffic control plans and project study reports, and is recognized in the industry as an ADA design specialist. His proactive approach is carried out seamlessly through project management, engineering design development, and construction support services to public agencies throughout Southern California and he has a proven track record in providing innovative, cost-saving, and sustainable solutions (such as alternative pavement rehabilitation methods, including full depth reclamation and cold-in-place-recycling) on numerous street improvement projects for major arterials and residential streets.

Artesia Boulevard Arterial Improvements, Gardena, California: The City of Gardena wanted to replace existing medians along Artesia Boulevard, from Western Avenue to Vermont Avenue, with a new decorative hardscape paving solution. Based on prior discussions with City sta
ff, t
he Cannon Team (including subconsultant BGB
Design Group) evaluated and presented four paving solutions to the City. Our team prepared a design study (exhibit) to convey the proposed limits of add or deducted hardscape for City direction. Following approval of the conceptual design direction, Cannon completed revisions to the previously submitted 95% design PS&E. Mr.

Solsona served as Project Manager.
170th Street Improvements, Gardena, California: This project spans 0.50 miles from Normandie Avenue to Vermont Avenue. Funded partly by $500,000 from the Federal Surface Transportation Program, the project focused on enhancing street drivability and aesthetics. Key accomplishments included rehabilitating asphalt concrete pavement, repairing concrete curbs and sidewalks, upgrading curb ramps to ADA standards, and installing a traffic signal system battery backup at a major intersection. Cannon’s role encompassed preparing construction plans, specifications, cost estimates, and handling the E-76 Authorization documentation, culminating in a project that met the City of Gardena’s safety and accessibility standards.

Select Project Experience Summary
Mr. Solsona has served as Project Manager on the following projects:
•
R
edondo Beach Blvd Arterial Improvements, Gardena, California •
Gar
dena Catch Basin Screens Project, Gardena, California
•
R
owley Park Restroom, Gardena, California
•
Anaheim Modjesk
a Park Underground Storm Water Detention and Infiltration System Anaheim, California
•
Concr
ete Street Pavement Reconstruction, Newport Beach, California •
Cerrit
os Avenue Sidewalk Gap Closure, Anaheim, California
•
Lak
eview Avenue Widening (Bastanchury to Lemon), Yorba Linda, California Professional Registration
•
Civil Engineer
, California,
No. 68420
•
Qualified S
WPPP Developer
– Practitioner #234666
Education
•
Bachelor of Science, Civil
Engineering
, California
State Polytechnic University,
Pomona, California
Professional Affiliations
•
Member – ASCE, A
CEC and
APWA
•
P
ast Board Member –
Filipino American Society of
Architects and Engineers
Gary Solsona, PE, QSD Principal-in-Charge / Contract Manager Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 30 CannonCity of Gardena, On-Call Civil Services
Marco Canta, PE Civil Design Engineer Lead
Professional Registration
•
R
egistered Civil Engineer,
California, No. 69244
Education
•
Bachelor of Science, Civil
Engineering
, Louisiana State
University, Baton Rouge,
Louisiana
Professional Affiliations
•
City and Coun
ty Engineers
Association - Member
•
Asian Americ
an Architects
and Engineers - Member
•
Americ
an Society of
Civil Engineering (ASCE),
Younger Member Forum
- Served as Membership
Coordinator
Mr. Canta has 20 years of professional civil engineering experience where he has worked on various projects in public works, roadway, drainage, utilities, and site design throughout Southern California. Mr. Canta has served as project manager for water districts, major international airports, local municipalities, private developments, and public agencies. He has knowledge of AASHTO, Caltrans SPPWC, Los Angeles County, and MUTCD standards. He is technically proficient with Civil 3D, MicroStation, InRoads, StormCad, Flowmaster, and HydroCalc.

Redondo Beach Boulevard Arterial Improvements, Gardena, California: The City of Gardena Public Works Department (City) retained the professional engineering services of Cannon to provide PS&E design services for the Redondo Beach Blvd Arterial Improvements Project from Crenshaw Blvd to Vermont Ave, approximately 1.9 miles in length. The project improvements propose to improve safety, access, and corridor traffic operations by modifying the existing raised medians and installing new raised medians to replace the existing two-way left turn medians, extend left turn pockets, and improve traffic channelization. Other components related to the design of the corridor include pavement reconstruction / rehabilitation, addition of bulb-outs (which require evaluating existing drainage systems), upgrading existing curb ramps to ADA compliance, upgrades to the traffic signal system. Mr. Canta served as Senior Civil Engineer on this project.

Select Project Experience Summary
Mr. Canta served as Project Manager or Senior Civil Engineer on the following projects:
•
San Juan W
ater Main Replacement, Sewer Main Improvements, and Street Reconstruction Project, Fullerton, California
•
Br
ookhurst Street Sanitary Sewer Improvement Project, Anaheim, California •
Art
esia Boulevard Arterial Improvements, Gardena, California •
Manha
ttan Beach Boulevard Resurfacing, Redondo Beach, California •
Lak
eview Ave Widening (Bastanchury to Lemon), Yorba Linda, California •
R
edondo Beach Blvd Arterial Improvements, Gardena, California •
Design Ser
vices for 2022 Pavement Rehabilitation, Carpinteria, California •
Lak
ewood Blvd. and Imperial Hwy. Intersection Improvement Project, Downey, California
•
Lanc
aster Avenue J PSR-PDS and PA&ED, Lancaster, California •
Malibu Civic Cen
ter Way Realignment Project, Malibu, California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 31 CannonCity of Gardena, On-Call Civil Services
Michael Kielborn, PE, QSP, LEED AP Water Resources Lead Professional Registration
•
R
egistered Civil Engineer,
California, No. 70112
•
LEED Accr
edited
Professional
•
Certified Horiz
ontal
Directional Drilling (HDD)
Inspector
Education
•
Bachelor of Science,
Civil Engineering
, Loyola
Marymount University, Los
Angeles, California
Professional Affiliations
•
Associa
tion of Water
Agencies of Ventura County
•
Americ
an Public Works
Association
•
Americ
an Water Works
Association
•
Calif
ornia Water
Environment Association
•
North Americ
an Society for
Trenchless Technology
•
Na
tional Association of
Sewer Service Companies
Mr. Kielborn specializes in water and wastewater management planning; water supply, storage, and distribution; and sewer system engineering. Since 1999, Mr. Kielborn has provided construction management/inspection services, primarily working in underground utility construction and infrastructure design. Since 2003, he has served as Project Manager for improvements to water supply and wastewater systems for numerous reservoirs, pump stations, wells, surge tanks, major water transmission mains, and trunk sewers. Mr. Kielborn is a certified Horizontal Directional Drilling Inspector. He has e
ffe
ctively translated his knowledge of construction practices into creating facility designs that are more efficiently constructible. Mr. Kielborn has developed excellent project management, cost estimation, in-field engineering management, inspection, coordination, and scheduling abilities for multi-million-dollar projects.
15 MG Zone 1 Reservoir Interior Coating and Improvements, Irvine Ranch Water District (IRWD), Irvine, California: IRWD’s 15 MG, welded steel Zone 1 Reservoir required an evaluation and a recoating/repair plan. Cannon provided engineering design services, including a diver inspection, basis of design memorandum, final repair plans and specifications, construction support, and coatings inspection. Cannon evaluated interior coating options; remediated corroded interior steel; replaced damaged appurtenances; provided improvements for securing the submersible sample pump and tank mixer; and designed improvements for the internal cathodic protection system. Mr. Kielborn served as Project Manager.

Ritter Ranch Recycled Water System Master Plan, Los Angeles County Waterworks District, Palmdale, California: As Project Engineer, Mr. Kielborn assisted with the master planning and sizing process on this project, which included preparing a Water System Master Plan for the development and neighboring developments such as City Ranch and Joshua Ranch. The Ritter Ranch development land use resulted in sizing more than 20 potable-water reservoirs, nine pump stations, pressure-reducing stations, supplement wells, and miles of water transmission mains.

Summary of Select Project Experience
• San Juan Ar ea Water Main, Fullerton, California
•
Fullert
on Rancho-Verona Water Main Replacement, Fullerton, California •
Euclid and R
osecrans Water Main Rehabilitation, Fullerton, California •
Nor
walk Manhole Inspection Project FY 18/19, Norwalk, California •
Morr
o Bay, Hwy 1 Force Main Pipeline Assessment, Morro Bay, California •
Pipeline Assessmen
t at Tuckers Grove Creek Crossing, Goleta Water District, Goleta, California
•
Design f
or Drainage Improvement Project, Oceano, California
•
Eliz
abeth Lake Road Pump Station, Palmdale, California
•
Las Vir
genes Municipal Water District (LVMWD) Cornell Pump Station, Las Virgenes, California
•
Be
verly Hills Pump Station No. 8, Beverly Hills, California •
A
venue O-12 and 25th West Water Demand Analysis, Palmdale, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 32 CannonCity of Gardena, On-Call Civil Services
Patrick Riddell, PE, QSD, CPII Construction Manager / Resident Engineer Professional Registration
•
R
egistered Civil Engineer,
California, No. 72034
•
Certified Public
In
frastructure Inspector
(CPII), American Public
Works Association
•
Qualified S
WPPP
Developer/Practitioner
(QSD/QSP), No. 72034
Education
•
Bachelor of Science,
En
vironmental Engineering,
California Polytechnic State
University, San Luis Obispo,
California
•
Caltr
ans Resident Engineer
Academy
Certification
•
Lane Closur
e System -
Caltrans
Professional Affiliations
•
Americ
an Society of Civil
Engineers
•
Americ
an Public Works
Association
Training
•
Ex
cavation Safety Training
for Competent Persons
(CPT), United Academy, ID:
1544359
As Construction Manager/Resident Engineer, Mr. Riddell provides direct support to Cannon’s resident engineer and construction management sta ff, i
ncluding direct
supervision of the overall project construction administration, pre-construction meetings, shop drawing review, inspections, processing of pay requests, assessing and resolving unforeseen conditions during construction, monitoring of schedules and budgets, overseeing equipment and materials testing, reviewing record drawings and certifications for accuracy, and confirming that work is in conformance with the contract documents and permit conditions before final acceptance. He also participates in conferences and meetings; coordinates activities with community and regulatory agencies; reviews and/or recommends acceptance of pay requisitions submitted by contractors; investigates and provides recommendations on contractor claims, change orders, etc.; and works with the Resident Engineer in the resolution of issues if encountered.

Ocean Boulevard Improvements, Pismo Beach, California: The City of Pismo Beach secured Emergency Relief funding from the Federal Highway Administration, administered locally through the Caltrans Department of Local Assistance to address the blu
ff
damage and prevent continued blu
ff
retreat. The City selected Cannon to
provide construction management, inspection, materials testing, environmental and cultural resource monitoring, and administrative services. Mr. Riddell served as Principal-in-Charge.

Summary of Select Project Experience
Mr. Riddell has served as Principal-in-Charge or Project Manager on the following projects:
•
City of Gar
dena CM & Inspection and Civil Engineering Design On-Call •
Golden St
ate Water Company CM & Inspection On-Call
•
City of El Mon
te Construction Management On-Call
•
City of San
ta Monica CM, Project Management, Civil Design On-Call
•
San
ta Clarita Valley Water District CM & Inspection and Civil Design On-Call •
Thr
ee Valleys Municipal Water District Engineering and Surveying Services On-Call •
City of Y
orba Linda Engineering, Plan Check, and Surveying Services On-Call •
City of Lak
e Forest Professional Services On-Call
•
City of San
ta Ana On-Call Construction Management
•
Camr
osa Water District CM & Inspection On-Call
•
City of Thousand Oak
s CM, Civil Engineering Design, and SCADA On-Call
•
2020-2021 and 2022-2023 P
avement Rehabilitation Project, Goleta, California
•
Cons
truction Management Services for Arterials 2023, San Luis Obispo, California •
2022 P
aving Project, Pismo Beach, California
•
Design and Cons
truction Management for Measure K-14 Street Repair and
Rehabilitation Program Projects, Grover Beach, California •
T
ank Farm and Orcutt Roundabout, San Luis Obispo, California •
Golden Hill and Union R
oad Intersection Improvements, Paso Robles, California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 33 CannonCity of Gardena, On-Call Civil Services
Professional Registration
•
R
egistered Civil Engineer,
California, No. 72982
Education
•
MB
A, University of
Phoenix, Arizona
•
BS, Civil Engineering
,
University of California,
Irvine, California
Paul Frislie, PE, IMSA Traffic Engineer
For over 23 years, Mr. Frislie has been involved in several transportation and traffic engineering projects that include both planning as well as design and deployment of ITS, systems integration, and traffic signal design. Recently, he has served as the Project Manager for the Manhattan Beach Downtown Signal Upgrade project, the Manhattan Beach Blvd/Peck Avenue Signal Modification Project, Artesia Boulevard Arterial Improvement Project, Corona ATMS Phase 3, and the La Canada Soundwall Phase 3 and 4 projects. He has also been the Lead Design Engineer for the development of design plans for the Oxnard ITS Master Plan Design Project, Vermont Avenue Arterial Improvement project, Newport Beach ITS Phase 1, 2, 3, 4 and 7 Projects and the Fountain Valley Phase IV project, as well as the Signal Construction Inspector for completion of the Oxnard ITS Master Plan and the Hawthorne Fiber Optic Communication Projects.

Summary of Select Project Experience
Mr. Frislie’s relevant projects include:
•
Euclid Str
eet Corridor Project Regional Traffic Signal Synchronization Program (RTSSP) – City of La Habra, California
•
PS&E f
or I-10 Corridor Freight and Express Lane Project, San Bernardino, California •
T
weedy Boulevard Signal Synchronization Project, City of South Gate, California •
City
wide Traffic Signal Design & Inventory, City of Manhattan Beach, California Cannon’s Subconsultants
Professional Registration /
Certifications
•
R
egistered Landscape
Architect, California
#2214
•
R
egistered Landscape
Architect, Nevada #488
•
Landsc
ape Irrigation
Auditor #81986
Education
•
BS, Landsc
ape
Architecture, California
State Polytechnic
University, Pomona
Arthur Guy, ASLA, CLIA Landscape Architect
Arthur Guy has over 40 years of landscape architecture and irrigation design experience; the previous 25 years as Principal with BGB. Among multiple duties, Mr. Guy directs a comprehensive approach to irrigation design for the firm and serves as the technical liaison pertaining to water management issues which arise during the planning, design, and implementation phases of projects. Mr. Guy’s knowledge of horticulture extends from high desert to tropical bioregions, enabling him to e ffe
ctively design planting and
irrigation systems appropriate to individual environmental requirements. Additionally, Mr. Guy provides landscape and irrigation plan check services relating to the City of Rancho Santa Margarita’s Water Conservation Landscape Ordinance.

Summary of Select Project Experience
Mr. Guy was the Principal on the following projects:
•
Railr
oad Corridor Pedestrian Beach Trail, City of San Clemente, California •
Univ
ersity Drive City of Irvine, California
•
Esplanade Str
eetscape, City of Redondo Beach, California
•
W
est Pacific Coast Highway Streetscape, City of Newport Beach, California •
Plano T
rabuco Median, City of Rancho Santa Margarita, California •
North El Camino R
eal Streetscape, City of San Clemente California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 34 CannonCity of Gardena, On-Call Civil Services
Certifications
•
R
egistered Civil Engineer,
California, No. C43764
Education
•
B
A, Environmental
Analysis & Design,
with a minor in Urban
& Regional Planning,
University of California,
Irvine
Kanwal Singh, PE Funding Specialist
Mr. Singh is a California licensed Professional Civil Engineer with over 35 years of broad-based experience in the public and private sectors. He has served as project manager and project engineer for several projects from less than $1 million to over $50 million. Mr. Singh has extensive experience in delivery and tracking of local agency transportation improvement projects funded with local sales tax Measure, State or Federal-aid funds. He has developed and/or implemented funding guidelines for local measures and federal-aid programs for transportation improvement projects.

Summary of Select Project Experience
• Pr epared project grant applications for various funding programs, including local sales tax Measure, State-aid, and Federal-aid programs. •
Pr
epared and obtained approvals from Caltrans for E76 fund obligation packages for various federal-aid program transportation improvement projects. •
Pr
epared “PES” forms for federal-aid projects for NEPA environmental clearance from Caltrans.
•
Pr
epared DBE packages for approval from Caltrans for the Cities. •
Pr
ovided construction administration/management services for various Local agency projects funded with Federal-aid and State-aid funds.
•
Pr
epared contract award packages, progress, and final closeout reimbursement invoices for approval from Caltrans for Federal and State grant funds.

Cannon’s Subconsultants
Professional Registration
•
R
egistered Civil Engineer,
California, No. CE 34996
•
R
egistered Geotechnical
Engineer, California, No.

GE 2030
Education
•
BS, Civil Engineering
,
Cal State University,
Northridge, California
John Leuer, CE, PE Geotechnical Engineer
Mr. Leuer has over 35 years of professional experience in the geotechnical and civil engineering field. In this time, Mr. Leuer has developed an extensive knowledge of the many geotechnical considerations involved in construction in the southern California area. Mr. Leuer is highly experienced in all aspects of soil and foundation engineering for a wide variety of projects ranging from multi-story commercial and industrial structures to several thousand acre planned community developments. Mr. Leuer has substantial experience coordinating projects for many City, County, and State agencies as well as in the public sector, gaining a reputation for being responsive to clients needs while providing strong technical expertise.

Summary of Select Project Experience
Mr. Leuer was the Project Manager on the following projects:
•
On-Call Compaction T
esting and Materials Testing Services Provided During
Construction, 2023 Citywide Pavement Rehabilitation Services, Perris, California •
On-Call Geot
echnical Observation, Compaction Testing, and Materials Testing Services Provided During Construction, Moreno Valley, California •
On-Call Geot
echnical, Compaction Testing, and Materials Testing Services Provided During Construction, Auto Center Drive Pavement Rehabilitation Project, Lake Elsinore, California
AAKKAALL CCoonnssuullttaannttss
Project Services
AKAL Consultants (dba of AAHK, Inc – a California Corporation) 34 Monserrat Place, Foothill Ranch, CA 92610 Phone: (949) 586-1006

Brief Description of Available Professional Services

AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Our team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed our clients’ expectations.

Given below is a partial list of professional services offered to the Public Agencies.

• Prepare project funding applications for Local, State-aid and Federal-aid program projects • Prepare federal- aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
• Prepare environmental "PES" forms for federal -aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
• Prepare Initial Site Assessment (ISA) reports
• Prepare Right-of-Way (ROW) Certifications
• Prepare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
• Prepare Quality Assurance Program (QAP) in compliance with Caltrans requirements • Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects
• Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right- of-way, and construction phases
• Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures
• Construction administration/management and project closing • Assist Agencies with project audits

These services can be provided at a fixed price or on a “time and material” basis. AKAL Consultants is always looking for efficient ways to do business and successful completion of our clients’ projects.

AKAL Consultants
Kanwal J. Singh, M.S., P.E.

Principal Engineer
Office: (949) 586-1006
Cell: (949) 293-1487
Email: [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 35 CannonCity of Gardena, On-Call Civil Services
Licenses / Certifications
•
Calif
ornia Real Estate
Broker #01944802
•
Certified Righ
t-of-
Way Agent (RWA),
International Right-of-
Way Association (IRWA)
Education
•
BS, Business
Adminis
tration/Real
Estate, California State
Polytechnic University,
Pomona
Addiel Flores Right-of-Way Acquisitions Specialist
Addiel Flores is a right-of-way Project Manager with over ten years of experience transacting real estate and performing acquisition/negotiations on behalf of public agencies for transit and transportation infrastructure projects. Addiel is experienced with the acquisition of property subject to eminent domain in California and has coordinated the sale of remnant land on behalf of government entities. As Right-of- Way Lead, Addiel will provide on-call oversight of comprehensive right-of-way services, including right-of-way cost estimation, appraisal coordination, title coordination and review, acquisition negotiation, relocation assistance, escrow coordination for easement, fee, or temporary construction easements, and closing services.

Summary of Select Project Experience
• City of Bell Gar dens, Garfield Avenue/Eastern Avenue Intersection Improvement, Bell Gardens, California
•
City of Do
wney, Lakewood Boulevard and Florence Avenue Intersection Improvement Project, Downey, California
•
City of F
ontana, Safe Routes to Schools (SRTS) Pedestrian Improvement Project, Fontana, California
•
City of Pic
o Rivera, Right-of-Way Acquisition Services for Pedestrian Bridge Overcrossing, Pico Rivera, California
•
City of Anaheim, Nohl Ranch Open Space T
rail Project, Anaheim, California:

Cannon’s Subconsultants
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 CannonCannon
16842 Von Karman Ave., Suite 150
Irvine, CA 92606
949.753.8111
Reliable Reliable
Responsive Responsive
SolutionsSolutions
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Reliable Responsive Solutions
Proposal forProposal for
Construction Construction
Management Management
and Inspection and Inspection
On-Call ServicesOn-Call Services
GardenaGardena
City ofCity of
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Table of Contents
Section 1: Firm Qualifications and Experience ...............................4 Familiarity of regional grants/competitive funds ..................................................... 8 Section 2: Personnel and Experience ...............................................9 Section 3: Organization Chart
............................................................ 11 Section 4: Similar Projects/Services
................................................ 15
Section 5: References
......................................................................... 28 Section 6: Fee Schedule
..................................................................... 29 Section 7: Resumes
.............................................................................. 33 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
June 13, 2024City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, PE, Assistant Public Works Director
Subject:

S
tatement of Qualifications for On-Call Construction Management and Inspection Services
Dear Mr. Kwak:

The City of Gardena (City) is seeking construction management and inspection services on an as-needed basis to support the City’s Public Works Capital Improvement Program (CIP). Our interest in this on-call contract stems from our Construction Management Division’s successful history of working with the City and on other similar public improvement projects. Our extensive knowledge of construction management practices for public works projects, established communication strategy, and success in reducing exposure to claims and litigation will support the City’s goals for this agreement.

On-Call Experience
Cannon will provide in-house construction management/inspection, civil, water resource, and surveying services. Throughout the past 48 years, Cannon has managed on-call contracts with public agencies using our standard best practices that are based on communication and responsiveness, specifically responding to emails, phone calls, and requests from our clients in a timely manner. Cannon has an outstanding record of delivering services on time and within budget. We will operate as an extension of City staff and will keep the City’s goals for projects at the forefront of our decision process.

Subconsultants
We have selected stellar subconsultants with whom we have a long working relationship. AVANT-GARDE (AGI) will provide public outreach and grant writing services, and LOR Geotechnical Group, Inc. will provide geotechnical engineering services.

Required Statements
• Cannon and its subc onsultants have no disciplinary actions to disclose. •
Cannon ackno
wledges the receipt and review of addendum one.
•
Cannon has r
eviewed the City’s sample agreement and insurance requirements and takes no exceptions.

We look forward to the opportunity to work with the City to achieve its goals and objectives. We are available to answer questions through the contact methods provided below, or to further discuss this proposal.

Sincerely
Category: Construction Management and Inspection
We will operate as
an extension of
City staff and will
keep the City’s
goals for projects
at the forefront
of our decision
process.

Patrick Riddell,* PE, CPII, QSD/P Main Point of Contact Director, Construction Management Division
1050 Southwood Drive, San Luis Obispo, CA 93401
( 805.503.4586 📱 805.235.0576  805.503.4446 * [email protected] *Authorized to bind firm.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 4 CannonCity of Gardena, On-Call CM & Inspection Services Firm Qualifications and Experience
11 Experience Counts
Cannon offe rs relevant expertise in the following areas:

Pavement Rehabilitation
and Full Depth Reclamation
Digouts, Striping, Marking,
and Curb Painting
Green Streets / Complete
Streets
ADA Improvements and
Curb Ramp Enhancements
Sidewalk, Curb, Gutter, and
Driveway Approach Repairs
Grading and Drainage
Office Locations
Services for the City will be provided primarily from
our Irvine office with support from our other offices, if needed. Cannon office locations include the following:

Irvine
16842 Von Karman Ave.

Suite 150
Irvine, CA 92606
( 949.753.8111
Ventura
305 S Kalorama St.

Suite A
Ventura, CA 93001
( 805.503.4590
Los Angeles
11900 W Olympic Blvd.

Suite 530
Los Angeles, CA 90064
( 310.664.1166
San Luis Obispo
1050 Southwood Dr.

San Luis Obispo, CA 93401
( 805.544.7407
Firm Profile
As a full-service construction management and inspection, engineering design, and surveying firm, Cannon takes
pride in the ability to o
ffe
r clients a complete range of
services. Our commitment to providing clients Reliable
Responsive Solutions, whether the project scope is
expansive or more specialized, spans 48 years.

During that time, we have worked with many cities,
counties, and agencies to maintain secure and dependable water systems; make streets safer and more pedestrian
and bicycle-friendly; and construct buildings and facilities that are structurally sound. These characteristics have been an integral part of the infrastructure improvement projects we have completed throughout California.

Our multidisciplinary team of 146 professionals includes the following:
•
APW
A Certified Public Infrastructure Inspectors
•
Caltr
ans Trained Resident Engineers and LAPM
Specialists
•
R
egistered Civil, Structural, Mechanical, and Electrical Engineers
•
Licensed Land Sur
veyors and Survey Technicians
•
Ins
trumentation and Controls (SCADA) Specialists
•
Coun
ty-, State-, and Federal-Level Funding
Administration Managers
Cannon Corporation- Providing Reliable Responsive Solutions since 1976

PROCORE
To efficiently maintain project documents, drawings,
contract change orders, contractor submittals, shop
drawings, and correspondence, we use electronic and
hard copy record keeping formats. For the electronic
format, we propose use of PROCORE. PROCORE helps
drastically increase project efficiency and accountability by streamlining and mobilizing project communications
and documentation. We currently have a
subscription and use PROCORE on a majority
of our CM projects. This
leads to more teamwork,
less rework, and a
smoother project.

Read more about our experience on pages 15-27.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 5 CannonCity of Gardena, On-Call CM & Inspection Services Cannon’s Canons
Cannon has principles, otherwise known as Cannon’s “Canons,” that are simply how we do business.

Two to Four, Never More: While it is not always possible to be available by phone, we pledge to return voice, email, and text messages within four hours.

Think Ahead: We are proactive, preemptive, and prepared.

We keep clients informed and provide updates before they call looking for them.

Be Reliable: We communicate with our clients and
teammates what we are going to do and then get it done.

Stand on the Shoulders of Others: We strive
to improve our operations system by using templates,
procedures, and what has worked in the past.

FIRM STATISTICS
200+
years of design
experience
100+
cumulative years
of on-call contracts
professional
engineers
40+48
years in
business
Since 1976, Cannon has been committed to providing engineering services. Our reputation is a direct result of our consistent attention to our clients’ needs. Eighty percent of our firm’s business is with repeat clients who trust in our integrity, as well as our professional competence. We have the expertise, experience, and capabilities to meet your needs as demonstrated in the qualifications and experience detailed in this proposal. However, the real proof of this expertise is found in what our past and current clients have to say:

David Gould, PE, District Engineer, Crescenta Valley Water District The projects that Cannon worked on for CVWD were on time and within budget. I have been pleased with the services provided by Cannon. I’ve found their personnel to be extremely thorough, diligent, and knowledgeable. I’d recommend their engineering consulting services without hesitation.

Chris Dejarme, PE, Senior Civil Engineer, City of Ventura I’ve found [Cannon’s] engineers to be extremely professional, diligent, and knowledgeable. I have been pleased with the services provided by Cannon and trust their knowledge and expertise in supporting Ventura with the City’s capital improvements.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 6 CannonCity of Gardena, On-Call CM & Inspection Services Accurate Coordination of Subconsultants
Cannon has extensive experience in accurately coordinating subconsultants, having worked with 100+ firms. From project onset, each subconsultant is integrated into our Quality Assurance process, making them fully vested and accountable members of the Cannon Team.

Quality Assurance Process
We are prepared to provide our clients services for each phase of their project, from bid support through preconstruction preparations, construction, and project close-out. As the first order of work on a project, we develop a unique Construction Management Plan which is customized to the type of work, the plans and specifications, and contractual requirements of the project. Below is our Construction Management Plan Checklist. This checklist will be used in collaboration with the City during scoping meetings to determine which specific tasks are needed. This checklist forms the basis of Cannon’s approach. This is the framework in which we monitor and enforce contract compliance, and in which we document and record the thorough inspections, materials sampling and testing, and other Quality Assurance procedures required by the contract for the successful completion of a project.

Construction Management Plan Checklist

1. 2.

3. a.

Provide a sign in sheet for all attendees.
b. Keep meeting minutes that show subjects discussed, direction given and response received.
c. Document items submitted by the contractor such as: the emergency response sheet, schedule, submittals and other items of importance.
d. Confirm the authority and responsibility of all parties involved. e. Verify the start date of construction.
f. Address the concerns and needs of affected utility companies. g. Discuss unusual working conditions and permit requirements. h. Verify that the contractor will give proper notification to the residents and businesses of the start date of construction and what kind of work is being performed.

1. 2.

3. 4.

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.

13. 14.

Coordinate materials testing for the project.

Notify City contact at any point in the project when a dispute arises, an unknown condition is discovered or at any time the contractor believed extra work/change order work is warranted.

Daily: Document manpower, equipment and materials used on site, separate activates, house and resources by pay item. Document Inspector arrival/departure time from site.

Notify contractor of any unacceptable condition or workmanship. Do not vary from the project specifications or design with the authority or approval of the engineer. Document the approved change.

Check site safety and signing.

Check for public safety and compliance to the approved traffic control plan.

Respond to basic public inquiries. Refer more complicated inquiries to appropriate City staff.

Verify storm water controls are in place and in good working condition.

Verify layout, operations and intent of work with the contractor.

Pre-Construction Conference:

After Pre-Construction Conference:

During Construction:

City staff will schedule the meeting; invite contractor, consultant, affected City staff, utility companies and regulating agencies.

The pre-construction meeting will be conducted by consultant staff and held in a City building. City staff assigned to the project will attend to answer and unusual questions.

The CM firm conducting the meeting must understand that the pre-construction conference sets the tone for the project. It is the contractor's first impression of the City/Consultant staff and how we operate. Be on time, professional, organized, knowledgeable of the project, convey any special requirements or concerns.

Review progress schedules submitted by the contractor and accept when satisfactory.

Document any conversations that could be significant in the event of a claim or dispute.

Log and review submittals and ship drawings as needed. Route submittals as needed for project engineer/architect's approval. Do not exceed the turnaround time.

Document any approved changes to the scheduled start date with a change order.

Disburse pre-construction meeting minutes.

Inspect and perform construction management services to ensure the project is built as designed and specified.

Log and route RFIs.

Prepare and route Draft Change Orders as required.

Prepare correspondence necessary to maintain control over the construction contract.

Page 2 of 4 ends
← All documents from this meeting