Cities Index.
Agenda packet

Glendale City Council
July 11, 2023

Document
Agenda packet
Meeting
July 11, 2023
Body
Glendale City Council
Pages
3
Original file
172.4 MB
Text extracted from the city's file for reading and search. Open the original on glendaleca.primegov.com. That file is the official record.

You may review complete plans, maps and exhibits in our office, MSB Room 103. We appreciate your consideration and look forward to your timely comments. Please do not recommend APPROVAL or DENIAL. For any questions, please contact the Case Planner ASAP, so as not to delay the case processing.

COMMENTS:
 This office DOES NOT have any comment.
This office HAS the following comments/conditions.  (See attached Dept. Master List) Date:___8/31/22________________
Print Name:___Foster McLean____________________________ Title:______Fire Marshal_________Dept.________Fire________Tel.:___7711___________ a. ADDITIONAL COMMENTS:

1. Fire sprinkler system. A complete automatic fire sprinkler system shall be installed in all new structures in accordance with the recommendations of NFPA 13D and the requirements of the Glendale Building and Safety Code. Plans and permit application shall be submitted to the Fire Department within 30 days of issuance of the building permit. Riser and all sprinkler piping shall be concealed; no exposed piping on exterior permitted. Quick response sprinkler heads are required throughout the structure unless contraindicated. Flat concealed sprinkler heads are required in all habitable areas.

2. Address. Approved address numbers, building numbers or approved building identification shall be placed in a position that is plainly legible and visible from the street, road and walkways giving access to and within the property. Address numbers shall be Arabic numerals or alphabet letters.

Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm) and shall be illuminated in an approved manner (if numbers are on the exterior).

Number height and stroke width shall be increased as needed for legibility based on visibility distance.

3. Emergency access walkway. Ensure a clear emergency access walkway leading from fire apparatus access road to exterior openings per the CFC. Landings shall be provided beneath bedroom rescue windows or doors to provide fire department access around the home. All architectural and landscape plans shall be designed to avoid any present or future obstructions that may hinder access and placement of fire department ladders.

4. High Fire Hazard Area. Projects located in the High Fire Hazard Area must comply with all related regulations (see the Fire Prevention Vegetation Management section of the Glendale Fire Department website www.glendalefire.org for a map and related requirements).

5. Hazard abatement. All hazardous vegetation shall be abated per city requirements for a distance of 100 feet prior to construction of any new structure (and from any existing structures) and shall be maintained at all times.

6. Fuel modification/Landscaping. All landscaping/fuel modification shall comply with the Hillside Development Landscape Guidelines. Provide a minimum 100-foot Fuel Modification Zone for all proposed and existing structures. Submit plans and application to obtain a Fire Permit.

7. Fire hydrants. Water main and/or fire hydrant upgrade/installation may be required. Show adjacent hydrant locations and spacing on the architectural site plan and civil drawings. GWP approval is required prior to submitting plans for Fire Department approval.

Revised 7 DECEMBER 2021 --VE 2
407 of 446
b. CASE SPECIFIC CODE REQUIREMENTS: (these are not standard code requirements)  1.
c. SUGGESTED CONDITIONS: (may or may not be adopted by the Hearing Officer)  1.

Revised 7 DECEMBER 2021 --VE 3
408 of 446

INTERDEPARTMENTAL COMMUNICATION

ENVIRONMENTAL IMPACT COMMENTS
(PLEASE SEND OUT THIS FORM ONLY WHEN ENVIRONMENTAL IMPACT COMMENTS ARE NEEDED.) Location:
_____ The project would not have adverse environmental effects on areas regulated by this Division/Section.
_____ The project would have potential environmental impacts on areas regulated by this Division/Section identified below.

NOTE: If project comments are not received by the due date, it will be assumed that your department has no comments.

POTENTIAL ENVIRONMENTAL IMPACT(S):

PROPOSED MITIGATION MEASURE(S):

The following mitigation measures are required to reduce adverse environmental effects to less than significant. (Please do not include code requirements listed in comment below):

ADDITIONAL COMMENTS:

CASE No.:_____________ Property Address: ______________________________ Name/Signature_______________________________Date:___________________ Title:_______________________Dept._____________ Tel. (Ext.):______________ Revised 7 DECEMBER 2021 --VE 4
409 of 446
POINT PERSON – DEPARTMENTS/DIVISION
CITY ATTORNEY – GILLIAN VAN MUYDEN (Miah Yun and Yvette Neukian, Alternates), MICHAEL GRANT (For Massage CUP Applications only) CITY CLERK – KAREN CRUZ
COMMUNITY DEVELOPMENT:

Building and Safety – SARKIS HAIRAPETIAN
Neighborhood Services –JACKIE JOUHARIAN, and RENE SADA (Seda Sardarian, Alternate)
Design Review & Historic (Glendale Register & Historic Districts) –

JAY PLATT
Economic Development – MARK BERRY
Housing – PETER ZOVAK and MIKE FORTNEY
Urban Design & Mobility – FRED ZOHREVAND (For VMT Analysis) COMMUNITY SERVICES AND PARKS – TEREZA ALEKSANIAN
INFORMATION SERVICES DEPT.

Wireless Communications – GORDON ARNOLD
FIRE ENGINEERING – SITA DEMIRJIAN and FOSTER MCLEAN
GLENDALE WATER AND POWER:

Water – GERALD TOM and SEDA BOGHOSIAN (Raja Takidin, Alternate) and FAUSTINO GARCIA
Electric – CATHERINE BABAKHANLOU and SEDA BOGHOSIAN and FAUSTINO GARCIA (Hovsep Barkhordian, and Daniel Scorza
Alternates)
POLICE – LT. JEFF NEWTON and ZAZIL AVILA, C.S.O.

PUBLIC WORKS:

Engineering & Land Development – EDWARD HITTI and RUEL VILLALUNA Traffic & Transportation–PASTOR CASANOVA and MARK BUENO Integrated Waste – DAN HARDGROVE
Maintenance Services/Street & Field/Urban Forester – LOREN KLICK, CARLOS LINARES, and ORLANDO URQUIDEZ
Facilities (City projects) – KEVIN TODD
OTHERS:

STATE ABC – PATRICIA HALPIN ([email protected]), TRIBAL CONSULTATION (EIF Applications) –
CAITLIN B. GULLEY (Tribal Historic and Cultural Preservation Officer, Fernandeno Tataviam Band of Mission Indians), and
JOSEPH ONTIVEROS (Cultural Resource Director, Soboba Band of Luiseno Indians)
LINDA CANDELARIA (Co-Chairwoman, Gabrielino-Tongva Tribe) (Sample Letters on Planning Share: ..\..\..\..\Environmental\Tribal Consultation Sample Letters)
Revised 7 DECEMBER 2021 --VE 5
410 of 446

CITY OF GLENDALE

INTERDEPARTMENTAL COMMUNICATION
Community Development Department
Request for Comments Form (RFC)
DATE: DUE DATE:

NOTE: If project comments are not received by the due date, it will be assumed that your department has no comments.

FROM: Dennis Joe, Senior Planner Tel. # 1/24/2022
PROJECT ADDRESS: 1650 Hazbeth Lane (APN 5648-024-013)
Applicant: Sam Talebian
Property Owner: Adel Luzuriaga
PROJECT DESCRIPTION:

To construct a new 3,239 square-foot, two-story, single-family residence and a detached 1,077 square-foot, three-car garage on a vacant 295,337 square-foot (6.78 acre) parcel, zoned R1R II (Restricted Residential, floor area district II). The project includes the construction of a private funicular (tramway) between the single-family dwelling and detached garage, a 288 square-foot portico and 1,987.75 cubic yards of cut/1,913.82 cubic yards of fill.

PLEASE CHECK:

G. INFORMATION SERVICES
A. CITY ATTORNEY (Wireless Telecom)
B. COMMUNITY DEVELOPMENT: H. PUBLIC WORKS (ADMINISTRATION):
• (1) Building & Safety X
X
• (1) Engineering & Land
X Development
X
X
•
•
•
•
•
(2) Neighborhood Services
(3) Design Review & Historic
(4) Economic Development
(5) Housing
•
•
•
•
(2) Traffic & Transportation
(3) Facilities (city projects only)
(4) Integrated Waste
(5) Maintenance Services/Urban
X Forester
X
X
(6) Urban Design & Mobility
J. GLENDALE POLICE D. COMMUNITY SERVICES/PARKS:

E. FIRE ENGINEERING (PSC) K. OTHER:
• (1) STATE-Alcohol Beverage
F. GLENDALE WATER & POWER: Control (ABC)
X
X
•
•
(1) Water •
•
(2) Tribal Consultations (EIFs)
(2) Electric (3) City Clerk’s Office

ENTITLEMENT(S) REQUESTED
Variance Case No.:

AUP/CUP Case No.:

ADR/DRB Case No.:

Tentative Tract/Parcel Map No.:

Zone Change/GPA:

Other
Revised 7 DECEMBER 2021 --VE 1
411 of 446

INTER-DEPARTMENTAL COMMUNICATION

PROJECT CONDITIONS AND COMMENTS
Project
Address: 1650 Hazbeth Lane (APN 5648-024-013)
Project
Case No.:

If project comments are not received by the due date, it will be assumed that your department has no comments.

NOTE: Your comments should address, within your area of authority, concerns and potentially significant adverse physical changes to the environment regarding the project. You may also identify code requirements specific to the project, above and beyond your normal requirements. Applicant will be informed early in the development process.

You may review complete plans, maps and exhibits in our office, MSB Room 103. We appreciate your consideration and look forward to your timely comments. Please do not recommend APPROVAL or DENIAL. For any questions, please contact the Case Planner ASAP, so as not to delay the case processing.

COMMENTS:


This office DOES NOT have any comment.

This office HAS the following comments/conditions.  (See attached Dept. Master List) Date:___________________
Print Name:_______________________________
Title:____________________________Dept.______________________Tel.:______________ a. ADDITIONAL COMMENTS:
 1. No tree report, but I see a landscape draft showing the planting of 22 Q. agrifolia. ROW is non-existent here so no street tree comments.
b. CASE SPECIFIC CODE REQUIREMENTS: (these are not standard code requirements)  1.
c. SUGGESTED CONDITIONS: (may or may not be adopted by the Hearing Officer)  1.

Revised 7 DECEMBER 2021 --VE 2
412 of 446

INTERDEPARTMENTAL COMMUNICATION

ENVIRONMENTAL IMPACT COMMENTS
(PLEASE SEND OUT THIS FORM ONLY WHEN ENVIRONMENTAL IMPACT COMMENTS ARE NEEDED.) Location:
_____ The project would not have adverse environmental effects on areas regulated by this Division/Section.
_____ The project would have potential environmental impacts on areas regulated by this Division/Section identified below.

NOTE: If project comments are not received by the due date, it will be assumed that your department has no comments.

POTENTIAL ENVIRONMENTAL IMPACT(S):

PROPOSED MITIGATION MEASURE(S):

The following mitigation measures are required to reduce adverse environmental effects to less than significant. (Please do not include code requirements listed in comment below):

ADDITIONAL COMMENTS:

CASE No.:_____________ Property Address: ______________________________ Name/Signature_______________________________Date:___________________ Title:_______________________Dept._____________ Tel. (Ext.):______________ Revised 7 DECEMBER 2021 --VE 3
413 of 446
POINT PERSON – DEPARTMENTS/DIVISION
CITY ATTORNEY – GILLIAN VAN MUYDEN (Miah Yun and Yvette Neukian, Alternates), MICHAEL GRANT (For Massage CUP Applications only) CITY CLERK – KAREN CRUZ
COMMUNITY DEVELOPMENT:

Building and Safety – SARKIS HAIRAPETIAN
Neighborhood Services –JACKIE JOUHARIAN, and RENE SADA (Seda Sardarian, Alternate)
Design Review & Historic (Glendale Register & Historic Districts) –

JAY PLATT
Economic Development – MARK BERRY
Housing – PETER ZOVAK and MIKE FORTNEY
Urban Design & Mobility – FRED ZOHREVAND (For VMT Analysis) COMMUNITY SERVICES AND PARKS – TEREZA ALEKSANIAN
INFORMATION SERVICES DEPT.

Wireless Communications – GORDON ARNOLD
FIRE ENGINEERING – SITA DEMIRJIAN and FOSTER MCLEAN
GLENDALE WATER AND POWER:

Water – GERALD TOM and SEDA BOGHOSIAN (Raja Takidin, Alternate) and FAUSTINO GARCIA
Electric – CATHERINE BABAKHANLOU and SEDA BOGHOSIAN and FAUSTINO GARCIA (Hovsep Barkhordian, and Daniel Scorza
Alternates)
POLICE – LT. JEFF NEWTON and ZAZIL AVILA, C.S.O.

PUBLIC WORKS:

Engineering & Land Development – EDWARD HITTI and RUEL VILLALUNA Traffic & Transportation–PASTOR CASANOVA and MARK BUENO Integrated Waste – DAN HARDGROVE
Maintenance Services/Street & Field/Urban Forester – LOREN KLICK, CARLOS LINARES, and ORLANDO URQUIDEZ
Facilities (City projects) – KEVIN TODD
OTHERS:

STATE ABC – PATRICIA HALPIN ([email protected]), TRIBAL CONSULTATION (EIF Applications) –
CAITLIN B. GULLEY (Tribal Historic and Cultural Preservation Officer, Fernandeno Tataviam Band of Mission Indians), and
JOSEPH ONTIVEROS (Cultural Resource Director, Soboba Band of Luiseno Indians)
LINDA CANDELARIA (Co-Chairwoman, Gabrielino-Tongva Tribe) (Sample Letters on Planning Share: ..\..\..\..\Environmental\Tribal Consultation Sample Letters)
Revised 7 DECEMBER 2021 --VE 4
414 of 446

CITY OF GLENDALE

INTERDEPARTMENTAL COMMUNICATION
Community Development Department
Request for Comments Form (RFC)
DATE: DUE DATE:

NOTE: If project comments are not received by the due date, it will be assumed that your department has no comments.

FROM: Dennis Joe, Senior Planner Tel. # 1/24/2022
PROJECT ADDRESS: 1650 Hazbeth Lane (APN 5648-024-013)
Applicant: Sam Talebian
Property Owner: Adel Luzuriaga
PROJECT DESCRIPTION:

To construct a new 3,239 square-foot, two-story, single-family residence and a detached 1,077 square-foot, three-car garage on a vacant 295,337 square-foot (6.78 acre) parcel, zoned R1R II (Restricted Residential, floor area district II). The project includes the construction of a private funicular (tramway) between the single-family dwelling and detached garage, a 288 square-foot portico and 1,987.75 cubic yards of cut/1,913.82 cubic yards of fill.

PLEASE CHECK:

G. INFORMATION SERVICES
A. CITY ATTORNEY (Wireless Telecom)
B. COMMUNITY DEVELOPMENT: H. PUBLIC WORKS (ADMINISTRATION):
 (1) Building & Safety X
X
 (1) Engineering & Land
X Development
X
X



(2) Neighborhood Services
(3) Design Review & Historic
(4) Economic Development




(2) Traffic & Transportation
(3) Facilities (city projects only)
(4) Integrated Waste


(5) Housing (5) Maintenance Services/Urban
X Forester
X
X
(6) Urban Design & Mobility
J. GLENDALE POLICE D. COMMUNITY SERVICES/PARKS:

E. FIRE ENGINEERING (PSC) K. OTHER:
 (1) STATE-Alcohol Beverage
F. GLENDALE WATER & POWER: Control (ABC)
X
X


(1) Water 

(2) Tribal Consultations (EIFs)
(2) Electric (3) City Clerk’s Office

ENTITLEMENT(S) REQUESTED
Variance Case No.:

AUP/CUP Case No.:

ADR/DRB Case No.:

Tentative Tract/Parcel Map No.:

Zone Change/GPA:

Other
Revised 7 DECEMBER 2021 --VE 1
415 of 446

INTER-DEPARTMENTAL COMMUNICATION

PROJECT CONDITIONS AND COMMENTS
Project
Address: 1650 Hazbeth Lane (APN 5648-024-013)
Project
Case No.:

If project comments are not received by the due date, it will be assumed that your department has no comments.

NOTE: Your comments should address, within your area of authority, concerns and potentially significant adverse physical changes to the environment regarding the project. You may also identify code requirements specific to the project, above and beyond your normal requirements. Applicant will be informed early in the development process.

You may review complete plans, maps and exhibits in our office, MSB Room 103. We appreciate your consideration and look forward to your timely comments. Please do not recommend APPROVAL or DENIAL. For any questions, please contact the Case Planner ASAP, so as not to delay the case processing.

COMMENTS:
 This office DOES NOT have any comment.
 This office HAS the following comments/conditions.  (See attached Dept. Master List) Date: February 11, 2022
Print Name: Pastor Casanova, T.E.

Title: Principal Traffic Engineer
Tel.: 818-937-8324
CC: Mark Anthony Bueno, P.E.

Dept. Public Works-Traffic Engineering
a. ADDITIONAL COMMENTS:
 1.
b. CASE SPECIFIC CODE REQUIREMENTS: (these are not standard code requirements)  1.
c. SUGGESTED CONDITIONS: (may or may not be adopted by the Hearing Officer)  1. The contractor shall not store trash bins, construction equipment, construction materials, or construction vehicles (concrete truck, dump truck, etc.) on City’s Right-OfWay (sidewalk, parkway, or street) without first obtaining a “Street-Use” permit from the Public Works - Engineering Division. Permit must be displayed at job site.

Revised 7 DECEMBER 2021 --VE 2
416 of 446

INTERDEPARTMENTAL COMMUNICATION

ENVIRONMENTAL IMPACT COMMENTS
(PLEASE SEND OUT THIS FORM ONLY WHEN ENVIRONMENTAL IMPACT COMMENTS ARE NEEDED.) Location:
_____ The project would not have adverse environmental effects on areas regulated by this Division/Section.
_____ The project would have potential environmental impacts on areas regulated by this Division/Section identified below.

NOTE: If project comments are not received by the due date, it will be assumed that your department has no comments.

POTENTIAL ENVIRONMENTAL IMPACT(S):

PROPOSED MITIGATION MEASURE(S):

The following mitigation measures are required to reduce adverse environmental effects to less than significant. (Please do not include code requirements listed in comment below):

ADDITIONAL COMMENTS:

CASE No.:_____________ Property Address: ______________________________ Name/Signature_______________________________Date:___________________ Title:_______________________Dept._____________ Tel. (Ext.):______________ Revised 7 DECEMBER 2021 --VE 3
417 of 446
POINT PERSON – DEPARTMENTS/DIVISION
CITY ATTORNEY – GILLIAN VAN MUYDEN (Miah Yun and Yvette Neukian, Alternates), MICHAEL GRANT (For Massage CUP Applications only) CITY CLERK – KAREN CRUZ
COMMUNITY DEVELOPMENT:

Building and Safety – SARKIS HAIRAPETIAN
Neighborhood Services –JACKIE JOUHARIAN, and RENE SADA (Seda Sardarian, Alternate)
Design Review & Historic (Glendale Register & Historic Districts) –

JAY PLATT
Economic Development – MARK BERRY
Housing – PETER ZOVAK and MIKE FORTNEY
Urban Design & Mobility – FRED ZOHREVAND (For VMT Analysis) COMMUNITY SERVICES AND PARKS – TEREZA ALEKSANIAN
INFORMATION SERVICES DEPT.

Wireless Communications – GORDON ARNOLD
FIRE ENGINEERING – SITA DEMIRJIAN and FOSTER MCLEAN
GLENDALE WATER AND POWER:

Water – GERALD TOM and SEDA BOGHOSIAN (Raja Takidin, Alternate) and FAUSTINO GARCIA
Electric – CATHERINE BABAKHANLOU and SEDA BOGHOSIAN and FAUSTINO GARCIA (Hovsep Barkhordian, and Daniel Scorza
Alternates)
POLICE – LT. JEFF NEWTON and ZAZIL AVILA, C.S.O.

PUBLIC WORKS:

Engineering & Land Development – EDWARD HITTI and RUEL VILLALUNA Traffic & Transportation–PASTOR CASANOVA and MARK BUENO Integrated Waste – DAN HARDGROVE
Maintenance Services/Street & Field/Urban Forester – LOREN KLICK, CARLOS LINARES, and ORLANDO URQUIDEZ
Facilities (City projects) – KEVIN TODD
OTHERS:

STATE ABC – PATRICIA HALPIN ([email protected]), TRIBAL CONSULTATION (EIF Applications) –
CAITLIN B. GULLEY (Tribal Historic and Cultural Preservation Officer, Fernandeno Tataviam Band of Mission Indians), and
JOSEPH ONTIVEROS (Cultural Resource Director, Soboba Band of Luiseno Indians)
LINDA CANDELARIA (Co-Chairwoman, Gabrielino-Tongva Tribe) (Sample Letters on Planning Share: ..\..\..\..\Environmental\Tribal Consultation Sample Letters)
Revised 7 DECEMBER 2021 --VE 4
418 of 446
City of Glendale, Community Development Department (9/12/11) PROPERTY ADDRESS: _____________________________________ ENTITLEMENTS REQUESTED:________________________________ I hereby acknowledge, on behalf of the applicant(s) and owner(s)/lessor(s) for the project above, that the applicant seeking entitlement has received the campaign finance disclosure forms related to applicants seeking entitlement before the City Council, Redevelopment Agency and Housing Authority. I acknowledge it is the applicant’s responsibility to review the requirements of the City’s campaign finance ordinance, including its disclosure obligations and its applicability to the applicant and its contractors and subcontractors, which include architects, engineers, design professionals, prime or general contractors, and subcontractors retained by the applicant at the time the application is pending before the Council, Redevelopment Agency or Housing Authority.

Executed on ___________________ at _____________________________, California Applicant’s Signature_________________________________, Print Applicant’s Full Name ___________________________________

ACKNOWLEDGMENT OF RECEIPT OF

CAMPAIGN FINANCE DISCLOSURE
(To Be Submitted at Time of Application Submittal)
Submit to Permit Services Center, 633 E. Broadway, Rm. 101. For more information call 818-548-3200.
1650 Hazbeth Lane, Glendale, CA 91202
June 30, 2022 Glendale
Adel Luzuriaga
New Single Family Residence
419 of 446
420 of 446
421 of 446
422 of 446
423 of 446
424 of 446
425 of 446
426 of 446
427 of 446
428 of 446
429 of 446
430 of 446
431 of 446
432 of 446
433 of 446
434 of 446
435 of 446
436 of 446
437 of 446
438 of 446
439 of 446
440 of 446
441 of 446
442 of 446
443 of 446

Page 1 of 3 ends

DESIGN REVIEW BOARD

RECORD OF DECISION
Meeting Date February 9, 2023 DRB Case No. PDR2201810
Address 1650 Hazbeth Lane
Applicant Adel Luzuriage
Project Summary:

To construct a new 3,239 square-foot, two-story, single-family residence and a detached 997 square-foot, three-car garage on a 6.61 acre (287,930 square-foot) lot with an average current slope of approximately 66.4%, zoned R1R II. The project includes a tram (3.5 foot by 5 foot metal passenger basket on approximately 140 linear feet of track) and proposes 6,732 cubic yards (CY) of grading (3,498 CY cut, 2,734 CY fill, 500 CY export).

Design Review:

Board Member Motion Second Yes No Absent Abstain
Lockareff X
Kaskanian X X
Simonian X X
Tchaghayan X
Welch X
Totals 4 0 1
DRB Decision Approve with conditions
Conditions:

1. The tram passenger basket and tracks are to be painted with a natural color to blend into the hillside, such as brown or grey-brown.

2. Prior to building plan check submittal, proposed locations of the lighting fixtures are to be provided on revised plans for staff review.
444 of 446

Page 2 of 3 ends

Determination of Compatibility: Site Planning
The proposed site planning is appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The proposed two-story dwelling will be centrally located on the 6.61 acre property and sited above the slope saddle between a knoll and the upsloping hillside at the northeast portion of the lot.
• The project’s buildings and structures, at their closest distances to the adjacent properties, will be set back 107 feet, 84 feet, 188 feet and 203 feet from the southern, eastern, northwestern, and western property lines, respectively, and comply with the underlying zone setback standards.
• The project proposes 6,732 cubic yards (CY) of grading - which approximately 3,498 CY of material is cut from the saddle of the hillside and 2,734 CY will be filled at other areas of the property to accommodate transitional slopes for the driveway to the detached three car garage and a hammerhead turnaround for the fire department. Approximately 500 CY of the remaining material will be exported off-site.

Determination of Compatibility: Mass and Scale
The proposed massing and scale are appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• Majority of the massing of the building is on the first level, which the ground floor is 2,678 square-feet and the second level is 561 square-feet.
• The single-family dwelling’s two-story profile will not be overbearing to the adjacent neighbors because single-family dwelling will be sited 238 feet, 124 feet, 226 feet, 188 feet, and 203 feet away from the neighboring properties to the south, east, north and west, respectively.
• The two-story volume steps toward the upslope side of the property following the natural topography of the lot. This quality is enhanced by the relatively small size of the upper floor.
• The single-family dwelling will be sited at a sloped saddle and concealed from certain vantages from the southern direction.

Determination of Compatibility: Design and Detailing
The proposed design and detailing are appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• Exterior finish materials selected blend in with the surrounding hillside and include quality materials, such as, composite (wood-like) horizontal siding, cementitious fiberboard (Hardie) trims (fascia, window surrounds, and accent bands), river rock base bands, and a standing seam metal roof colored in dark brown. Materials and colors are consistent on all four sides of the house and the visible exterior of the garage. 445 of 446

Page 3 of 3 ends

• The windows consist of a variety of operations that are consistent with the style of the building, such as, horizontal sliding, casement, hopper and fixed. The windows and exterior doors are constructed of metal-clad wood colored in dark bronze. • An approximately 140-foot (length) tram will be constructed adjacent to the concrete stairway set into the hillside providing access to and from the detached garage downhill from the two-story dwelling.
• The adjoining neighborhood, which lies at a distance from the subject house, is comprised of a variety of contemporary Ranch-style single-family dwellings. The proposed house is well designed and compatible with the nearby homes.

DRB Staff Member Dennis Joe, Senior Planner
Notes:

Contact the case planner for an appointment for a DRB stamp. DRB stamps will no longer be stamped over the counter without an appointment.

The Design Review Board approves the design of project only. Approval of a project by the Design Review Board does not constitute an approval of compliance with the Zoning Code and/or Building Code requirements.

If an appeal is not filed within the 15-day appeal period of the Design Review Board decision, plans may be approved for Building Division plan check. Prior to Building Division plan check submittal, Design Review Board approved plans must be stamped approved by the Design Review staff.

Any changes to the approved plans may constitute returning to the Design Review Board for approval. Prior to Building Division plan check submittal, all changes in substantial conformance with approved plans by the Design Review Board must be on file with the Planning Division. 446 of 446

← All documents from this meeting