ALPHABETICAL INDEX
Title Section Subsection
A
Acceptance of Work VI 9.

Agreement V
Assignment V 4.5
Attorney's Fees V 7.9
Authority of the City Engineer VI 7.

Award of Contract II 10.

B
Bid III 2.

Bid Bond IV
Bidders Security I
Bidders Security II 7.2
Bid Form II 6.1
Bid Proposal III
Bids to Remain Open II 9.

Bonds I
Bonds II 11.1
C
Certificate of Compliance with Certain Regulations VI 9.05 City Consent to Subcontractor VI 5.02
City's Right to Award Other Contracts VI 6.01
City's Right to Terminate V 7.7
Compaction Tests VI 8.10
Contract Documents and Site, Examinations of II 4.

Contract, Fulfillment of VI 9.01
Contract Sum V 2.1
Contractors Responsibilities VI 6.02
Copies of Contract Documents II 2.

Correction of Work Before Acceptance VI 9.02
Cutting and Patching VI 8.11
D
Deductions for Uncorrected Work VI 9.03
Defined, Terms II 1.

Definition of Bid Items VIII
Definitions VI 1.

Delay to Contractor, Payment for VI 4.01
Delivery of Agreement II 11.

Designations of Subcontractors III 6.

Disputes Pertaining to Payment for Work VI 7.04
Drawings, Interpretations VI 7.02
Dust Control VI 8.03
Item #11. Page 388
Meeting Date: 9/13/2022 / Packet Page #: 619
Revised 10/2019
INDEX

Page 128 ends

Title Section Subsection
E
Entire Agreement V
Escrow Agreement for Security Deposits in Lieu of Retention VII Examinations of Contract Documents and Site II 4.

F
Faithful Performance Bond V 5.5
Final Cleaning Up VI 9.04
Fulfillment of Contract VI 9.01
G
General Authority (of City Engineer) VI 7.01
General Conditions VI
General Provisions VI 8.

H
Hydrant Meters (under Water Supply) VI 8.02
I
Indemnification V 5.3
Independent Contractor V 4.4
Inspections, Test and VI 8.08
Instructions to Bidders II
Insurance V 5.

Interpretation II 5.

Interpretation of Drawings and Specifications VI 7.02
J
Job Guidelines VIII
L
Labor and Materials Bond V 5.6
Layout and Field Engineering VI 8.06
Legal Requirements V 7.10
Liens VI 2.05
Liquidated Damages VI 4.03
M
Miscellaneous Provisions V 9.

N
Non-Collusion Affidavit III
Notice V 9.1
Notice Inviting Bids I
NPDES Requirements IX
O
Or-Equal VI 2.02
Item #11. Page 389
Meeting Date: 9/13/2022 / Packet Page #: 620
Revised 10/2019
INDEX

Page 129 ends

Title Section Subsection
P
Payments V 2.

Payment for Delays to Contractor VI 4.01
Payment for Work, Disputes pertaining to VI 7.04
Performance of Work V 1.

Prevailing Wages I
Prevailing Wages V 7.10
Prevailing Wages (under Certificate of Compliance) VI 9.05(a) Progress Payments to Contractor V 2.3
VI 3.

Proposal III
Q
Qualifications of Bidder II 3.

R
Record Keeping VI 8.12
Removal and Disposal of Structures and Obstructions VI 8.04 Retention (under Liquidated Damages) VI 4.03
Retention V 7.3
VII (3)
Rights of the City to Increase Working Days VI 4.02
Recycled Materials Certificate VI 9.06
S
Samples VI 2.03
Schedule V 3.

Signatures II 12.

Site, Examination of Contract Documents and II 4.

Soils Investigation Report VI 8.09
Special Conditions VIII
Standard Drawings XI
Standard Specifications VI 1.03
Subcontracting VI 5.

Subcontractors Bound By Contract VI 5.01
Subcontractors, Designation (under Terms defined) VI 1.02(k) Submission of Bid II 7.

Substitution of Securities VI 3.01
Surveys VI 8.05
T
Terminate, City's Right to V 7.7
Terms Defined II 1.

Terms Defined VI 1.02
Tests and Inspection VI 8.08
Time for Commencement and Completion II 13.

Time for Completion VI 4.

Traffic Requirements VI 8.07
Item #11. Page 390
Meeting Date: 9/13/2022 / Packet Page #: 621
Revised 10/2019
INDEX

Page 130 ends

Title Section Subsection
U
Unit Price List III
Use of Premises VI 2.01
Utilities VI 8.01
V
Vicinity Map……………………………………………………………………….. X
W
Waiver V 7.4
Warranty VI 2.04
Water Supply VI 8.02
Withdrawal of Bids II 8.

Work and Material Requirements VI 2.

Work by Others VI 6.

Worker's Compensation Insurance V 5.1(b)
Working Days, Rights of the City to Increase VI 4.02
Item #11. Page 391
Meeting Date: 9/13/2022 / Packet Page #: 622
SANTA FE AVE, AND NEWBURGH ST AREA WATER AND STREET IMPROVEMENT PLAN CDBG BENDER AVENUE, CARTER DR, ABBREVIATIONS WATER LEGEND KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By: Engineering GLENDORA Division CITY OF REVISIONS 3/2022 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 1 PLAN NO 1327 NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL LOCAL N.P.D.E.S. PERMIT REQUIREMENTS. PROJECT VICINITY MAP NOT TO SCALE PROJECT LOCATION (626) 914-8246 (626) 914-8256 (626) 914-8257 (626) 914-8250 (626) 963-5719 (909) 592-3772 (626) 813-4512 (818) 701-2516 (626) 914-4382/252 (626) 445-7630 (626) 963-1821 PUBLIC WORKS DEPARTMENT CITY OF GLENDORA WATER DIVISION ENGINEERING DIVISION - PROJECT COORDINATOR POLICE DEPARTMENT (24 HR. EMERGENCY) FIRE DEPARTMENT (CONSTRUCTION NOTIFICATION) SOUTHERN CALIFORNIA EDISON VERIZON SOUTHERN CALIFORNIA GAS CO. TIME WARNER CABLE LA COUNTY PUBLIC WORKS FLOOD CONTROL - LONGDEN YARD CITY/AGENCY NOTIFICATION: SHEET INDEX MAP NO SCALE SHEET INDEX SHEET NO TITLE SHEET CONSTRUCTION NOTES NOTES CONTRACTOR IS REQUIRED TO CONTACT UNDERGROUND SERVICE ALERT (USA/SC) FOR UTILITY MARKING, POTHOLE ALL UTILITY & SUBSTRUCTURE LOCATIONS AND VERIFY PROPER CLEARANCE OF ALL PROPOSED WATER INSTALLATIONS PRIOR TO COMMENCING WORK. CONTRACTOR SHALL PROVIDE THE CITY WITH DEPTH, SIZE, TYPE AND LOCATION OF ALL UTILITIES AND SUBSTRUCTURES POTHOLED AND NOTIFY THE CITY ENGINEER OF ANY CONFLICTS WITH PLAN. CONTRACTOR SHALL ALLOW MINIMUM OF TWO WORKING DAYS FOR REVISED GRADES AND/OR ALIGNMENTS TO BE DETERMINED AND APPROVED BY THE CITY ENGINEER. MAXIMUM SHUT DOWN TIME ALLOWED IS 6 HOURS EXCLUDING TIME REQUIRED BY THE CITY FOR SHUT DOWN AND FILLING. DEWATERING AND ALL WORK REQUIRED TO PLACE SYSTEM IN SERVICE IS INCLUDED IN THE MAXIMUM SHUT DOWN TIME. CONTRACTOR IS REQUIRED TO PROTECT ALL LANDSCAPING IN PLACE. ANY REQUIRED REPAIRS MUST MEET EXISTING CONDITIONS TO THE SATISFACTION OF THE CITY ENGINEER. ALL MAINS, FITTINGS, VALVES AND APPURTENANCES SHALL BE POLYETHYLENE ENCASED. ENCASEMENT SHALL BE PER AWWA, DIPRA AND MANUFACTURER'S SPECIFICATIONS. THE CONTRACTOR IS REQUIRED TO BLANK AND ABANDON ALL EXISTING MAINS. ALL EXISTING VALVE SLIP CANS AND LIDS SHALL BE REMOVED FOR THE ABANDONED VALVES AND THE VOID LEFT BY THE VALVE FILLED WITH 1-SACK CEMENT SAND SLURRY. 3/2/2022 Item #11. Page 392
Meeting Date: 9/13/2022 / Packet Page #: 623
PLAN VIEW INSTALL METER BOX PER STD. 2.05. INSTALL 1" TYPE K COPPER PIPE INSTALL 1" SERVICE ASSEMBLY PER STD. 2.25 TIE-IN TO EXISTING CUSTOMER LATERAL AS REQUIRED. INSTALL METER COUPLING & 1" GATE VALVE PER STD. 2.28 CUT & REMOVE EXISTING SERVICE LATERAL CLEAR OF NEW INSTALLATION. INSTALL 1" TYPE K COPPER PIPE AND FITTINGS AS REQUIRED. TIE-IN TO EXISTING CUSTOMER LATERAL AS REQUIRED. EXISTING WATER METER AND BOX. 12" MINIMUM EXISTING CUSTOMER LATERAL. EXISTING CUSTOMER LATERAL. PLANELEVATION INSTALL 1" SERVICE ASSEMBLY PER STD. 2.25 INSTALL METER COUPLING & 1" GATE VALVE PER STD. 2.28 EXISTING CUSTOMER LATERAL EXISTING CUSTOMER LATERAL. 12" MIN. (TYP.) EXISTING 112" STL LATERAL REMOVE & CUT EXISTING 1-12" STL & ANGLE METER STOPS 12" CLEAR OF NEW INSTALATION. REMOVE EXISTING METER AND BOX. INSTALL NEW METER AND BOX (SUPPLIED BY THE CITY) PER RELEVANT CITY STANDARDS. CUT & PLUG EXIST. 112" STL LATERAL. (TO BE REMOVED)

INSTALL NEW METER (SUPPLIED BY
THE CITY) PER STD. 2.28. EXISTING METER TO BE REMOVED BY THE CONTRACTOR AND LEFT ADJACENT TO THE METER BOX TO BE PICKED UP BY THE CITY. (TO BE ABANDONED IN PLACE) 12" MIN. (TYP.)REMOVE EXISTING METER AND BOX. INSTALL NEW METER AND BOX (SUPPLIED BY THE CITY) PER RELEVANT CITY STANDARDS. TYPICAL SERVICE TIE-IN DETAIL NO SCALE (FOR EXISTING DUAL SERVICE REPLACED BY NEW SINGLE SERVICES.) TYPICAL SERVICE TIE-IN DETAIL NO SCALE (FOR EXISTING SINGLE SERVICE REPLACED BY SINGLE SERVICE.)

INSTALL NEW METER (SUPPLIED BY
THE CITY) PER STD. 2.28. EXISITNG METER TO BE REMOVED BY THE CONTRACTOR AND LEFT ADJACENT TO THE METER BOX TO BE PICKED UP BY THE CITY. TEMPORALLY POSITION ANGLE STOP TO SIDE UNTIL NEW SERVICE IS ACCEPTED FOR TIE INS. AFTER EXISTING SERVICE IS REMOVED AS NOTED, REMOVE ANY BACKFILL AS REQUIRED AND POSITION ANGLE STOP FOR TIE-IN (TYPICAL). 6" 6" CRUSHED AGGREGATE BASE BACKFILL SAND BEDDING / BACKFILL TYPICAL TRENCHING DETAIL NO SCALE 6"
MAY VARIES AS PER SITE ELEVATION RECONNECT SERVICE AND TIE-IN TO EXISTING CUSTOMER LATERAL AS REQUIRED. KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By: Engineering GLENDORA Division CITY OF REVISIONS 3/2022 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 2 DETAIL "A" DETAIL "C" DETAIL "D" DETAIL "E" DETAIL "F" DETAIL "G" WATER DETAILS DETAIL "B" CONSTRUCTION NOTES DETAIL "H" DETAIL "I" DETAIL "J" DETAIL "K" 3/2/2022 Item #11. Page 393
Meeting Date: 9/13/2022 / Packet Page #: 624
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF REVISIONS 3/2022 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 3 WATER IMPROVEMENTS CONSTRUCTION NOTES NOT IN CONTRACT 3/2/2022 Item #11. Page 394
Meeting Date: 9/13/2022 / Packet Page #: 625
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF REVISIONS 12/2021 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 4 WATER IMPROVEMENTS CONSTRUCTION NOTES e: 3/2/2022 3/2022 Item #11. Page 395 Meeting Date: 9/13/2022 / Packet Page #: 626
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF REVISIONS 3/2022 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 5 WATER IMPROVEMENTS CONSTRUCTION NOTES 3/2/2022 Item #11. Page 396
Meeting Date: 9/13/2022 / Packet Page #: 627
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF REVISIONS 3/2022 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 6 WATER IMPROVEMENTS CONSTRUCTION NOTES NOT IN CONTRACT 3/2/2022 Item #11. Page 397
Meeting Date: 9/13/2022 / Packet Page #: 628
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF REVISIONS 3/2022 No. DESCRIPTION Appr Date: WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 7 WATER IMPROVEMENTS CONSTRUCTION NOTES NOT IN CONTRACT 3/2/2022 Item #11. Page 398
Meeting Date: 9/13/2022 / Packet Page #: 629
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF STREET IMPROVEMENT PLANS 12/2021 WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. REVISIONS No. DESCRIPTION Appr Date: BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 1/20/2022 8 NOT IN CONTRACT 1 Item #11. Page 399
Meeting Date: 9/13/2022 / Packet Page #: 630
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF STREET IMPROVEMENT PLANS 12/2021 WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. REVISIONS No. DESCRIPTION Appr Date: BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 1/20/2022 9 Item #11. Page 400 Meeting Date: 9/13/2022 / Packet Page #: 631
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF STREET IMPROVEMENT PLANS 12/2021 WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. REVISIONS No. DESCRIPTION Appr Date: BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 1/20/2022 10 Item #11. Page 401 Meeting Date: 9/13/2022 / Packet Page #: 632
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF STREET IMPROVEMENT PLANS 12/2021 WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. REVISIONS No. DESCRIPTION Appr Date: BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 1/20/2022 11 NOT IN CONTRACT Item #11. Page 402
Meeting Date: 9/13/2022 / Packet Page #: 633
KPDJA City Engineer RCE 51197 Date Approved By: SCALE 12 File No.: Sheet of Date: Scale: Checked By: Drawn By:

Engineering GLENDORA Division CITY OF STREET IMPROVEMENT PLANS 12/2021 WHERE FIELD CONDITIONS NECESSITATE, A DEVIATION FROM OR MODIFICATION TO THE APPROVED PLAN, THE CONTRACTOR SHALL STOP ALL WORK RELATED TO OR AFFECTED BY SAID FIELD CONDITIONS. THE PROJECT ENGINEER SHALL SUBMIT DESIGN REVISIONS TO THE CITY ENGINEER FOR REVIEW AND OBTAIN APPROVAL PRIOR TO RESUMING CONSTRUCTION. ALLOWED WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER NO FIELD CHANGES CONTRACTOR NOTICE: Know what'sbelow. Callbefore you dig. REVISIONS No. DESCRIPTION Appr Date: BENDER AVE, CARTER DR, ET. AL IMPROVEMENTS PLAN NO. 1327 12 1/20/2022 NOT IN CONTRACT Item #11. Page 403
Meeting Date: 9/13/2022 / Packet Page #: 634
ADDENDUM # 1

CDBG BENDER AVENUE, CARTER DR, SANTA FE AVE, AND

NEWBURGH ST AREA WATER AND STREET IMPROVEMENT
PROJECT, PLAN NO. 1327
QUEST CDN # 8221450
Issued: JUNE 29, 2022
Item #11. Page 404
Meeting Date: 9/13/2022 / Packet Page #: 635

CITY OF GLENDORA
116 E. FOOTHILL BOULEVARD
GLENDORA, CALIFORNIA 91741

CDBG BENDER AVENUE, CARTER DR, SANTA FE AVE, AND NEWBURGH ST AREA WATER AND STREET IMPROVEMENT PROJECT, PLAN NO. 1327 ADDENDUM NO. 1
Issued: June 29, 2022
This addendum hereby becomes a part of the request for proposal documents of the above referenced project.

The following modifications are hereby made to the CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and Newburgh St Area Water and Street Improvement Project, Plan No. 1327.

The bid opening date is modified to July 7, 2022 at 10:00 a.m.

Bidders shall execute the Bidder’s Certification included in this Addendum No. 1 and shall submit the signed Certification along with the Bidder’s Proposal.

June 29, 2022
Principal Civil Engineer

BIDDER'S CERTIFICATION
Receipt of Addendum Number 1 is hereby acknowledged and all conditions contained therein are accepted.

Date ____ Bidder/Company Name ________________________________ Signature ___________
Title ____
Item #11. Page 405
Meeting Date: 9/13/2022 / Packet Page #: 636
ADDENDUM # 2

CDBG BENDER AVENUE, CARTER DR, SANTA FE AVE, AND

NEWBURGH ST AREA WATER AND STREET IMPROVEMENT
PROJECT, PLAN NO. 1327
QUEST CDN # 8221450
Issued: JULY 6, 2022
Item #11. Page 406
Meeting Date: 9/13/2022 / Packet Page #: 637

CITY OF GLENDORA
116 E. FOOTHILL BOULEVARD
GLENDORA, CALIFORNIA 91741

CDBG BENDER AVENUE, CARTER DR, SANTA FE AVE, AND NEWBURGH ST AREA WATER AND STREET IMPROVEMENT PROJECT, PLAN NO. 1327 ADDENDUM NO. 2
Issued: July 6, 2022
This addendum hereby becomes a part of the request for proposal documents of the above referenced project.

The following modifications are hereby made to the CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and Newburgh St Area Water and Street Improvement Project, Plan No. 1327.

The bid opening date is modified to July 21, 2022 at 10:00 a.m.

Bidders shall execute the Bidder’s Certification included in this Addendum No. 2 and shall submit the signed Certification along with the Bidder’s Proposal.

July 6, 2022
Principal Civil Engineer

BIDDER'S CERTIFICATION
Receipt of Addendum Number 2 is hereby acknowledged and all conditions contained therein are accepted.

Date ____ Bidder/Company Name ________________________________ Signature ___________
Title ____
Item #11. Page 407
Meeting Date: 9/13/2022 / Packet Page #: 638
1 ADDENDUM # 3

CDBG BENDER AVENUE, CARTER DR, SANTA FE AVE, AND

NEWBURGH ST AREA WATER AND STREET IMPROVEMENT
PROJECT, PLAN NO. 1327
QUEST CDN # 8221450
Issued: JULY 12, 2022
Item #11. Page 408
Meeting Date: 9/13/2022 / Packet Page #: 639
2 CITY OF GLENDORA
116 E. FOOTHILL BOULEVARD
GLENDORA, CALIFORNIA 91741

CDBG BENDER AVENUE, CARTER DR, SANTA FE AVE, AND NEWBURGH ST AREA WATER AND STREET IMPROVEMENT PROJECT, PLAN NO. 1327 ADDENDUM NO. 3
Issued: July 12, 2022
This addendum hereby becomes a part of the request for proposal documents of the above referenced project.

This will not modify the bid opening date.

The following modifications are hereby made to the CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and Newburgh St Area Water and Street Improvement Project, Plan No. 1327.

Bidders shall execute the Bidder’s Certification included in this Addendum No. 3 and shall submit the signed Certification along with the Bidder’s Proposal.

1. The following revisions are made to the Public Works Agreement:
a. Replace Item III of Exhibit “A” Scope of Work with the following:

III. In addition to the requirements of Section 6.2, Contractor shall facilitate a biweekly meeting (every 2 weeks) to deliver and discuss the following items:

A. Existing conditions report and status of overall work schedule B. Progress reports of work completed over the past two (2) weeks C. Report of work to be completed over the next two (2) weeks D. Report on pending request for information (RFIs)

2. The following revisions are made to the special provisions:
a. GENERAL:
i. Replace the last sentence with the following:

Any changed to the plans or clarification of the plans and specs must be submitted through an RFI. Clarifications of plans and specs shall be submitted through a request for information (RFI). Contractor must receive written approval from the engineer on record (EOR) or his designee prior to deviating from the design plans and specs.
b. BID ITEM NO. 2 – TRAFFIC CONTROL:
i. Replace the fourth paragraph with the following:

Item #11. Page 409
Meeting Date: 9/13/2022 / Packet Page #: 640
3 Contractor shall provide traffic control per the Work Area Traffic Control Handbook (WATCH). Prior to commencing construction within intersections, Contractor shall submit a drawing showing type and locations of traffic control devices and locations of flaggers.
ii. Remove the first three paragraphs under subsection “PROJECT ADVISORY SIGN.”
c. BID ITEM NO. 5 – INSTALL 8” PVC, C-909, PC 235 WATER MAIN:
i. Replace subsection “PVC PIPE” with the following:

PVC PIPE
Polyvinyl Chloride pipe shall conform to the requirements of AWWA Standard C909, PC 235 “Molecularly Oriented Polyvinyl Chlorine (PVCO) Pressure Pipe”, Pressure Class 305. Unless otherwise specified, PVC or PVCO pipe shall only be used for pipe sizes 4 inch through 12 inch. PVC or PVCO pipe for pipes larger than twelve-inch (12”) shall not be allowed. All pipes shall be colored blue or white. Tracer wire and warning tape are required on all PVC and PVCO installations. The use of Polyvinyl Chloride pipe requires approval by the Utility.
ii. Replace subsection “PIPE JOINTS” with the following:

PIPE JOINTS
PVC or PVCO pipe shall be furnished in twenty-foot (20’) nominal laying lengths and have bell-end push-on joints. All pipe joints shall be restrained within 60’ from any fitting, unless otherwise noted on the project plans. iii. Remove subsection “SELF-RESTRAINING TYPE for PVC and PVCO Pipe.”
d. BID ITEM NO. 10, 11, and 12 – INSTALL MJxMJ BEND/REDUCER:
i. Remove subsection “SELF-RESTRAINING TYPE for PVC and PVCO Pipe.”
e. BID ITEM NO. 14 – INSTALL 8” FL x 8” FL x 8” FL TEE:
i. Remove subsection “SELF-RESTRAINING TYPE for PVC and PVCO Pipe.”

3. Responses to questions received are attached as Attachment “A” and made part of this addendum.

Item #11. Page 410
Meeting Date: 9/13/2022 / Packet Page #: 641
4 July 12, 2022
Principal Civil Engineer

BIDDER'S CERTIFICATION
Receipt of Addendum Number 3 is hereby acknowledged and all conditions contained therein are accepted.

Date ____ Bidder/Company Name ________________________________ Signature ___________
Title ____
Item #11. Page 411
Meeting Date: 9/13/2022 / Packet Page #: 642
ATTACHMENT “A”

RESPONSES TO QUESTIONS RECEIVED
Request for Proposals
CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and Newburgh St Area Water and Street Improvement Project, Plan No. 1327
QuestCDN# 8221450
Q1. Are the connections at Calmgrove Ave included? Please confirm whether Items 22 and 23 are included in the bid list.

A1. Yes, the connections at the intersection of Carter Dr and Calmgrove Ave are included to tie back into the existing system.

Q2. In regards to the C909 pvc pipe. The plans and bid schedule call for PC235 C909 pipe but the project spec in the special conditions it calls for both PC235 and pressure class 305 see below in the screenshot. Please clarify which of the two it needs to be? A2. PC 235.

Q3. Will the Contractor be expected to perform temporary “highlining” to maintain water service during construction of this project, or is it more likely that the project can be constructed without the use of temporary highlines?
A3. Existing water main will remain in service until new water main is hydro and bacterial tested and passed. Existing water main will be abandoned in place after switching to the new water main. No highlining is required.

Q4. Could you please let me know if the native material at this project will be acceptable for trench zone backfill? If not, will crushed miscellaneous base (CMB) be acceptable for trench zone backfill? The detail on sheet 2 of the plans calls out crushed aggregate base (CAB).

A4. Per SD&S 1.09, crushed miscellaneous base (CMB) is acceptable. Native material is not acceptable for trench backfill.

Q5. Are Stainless Steel Harness to be used to restrain the pipe to pipe joint for the C-909 pipe? (if the C-909 pipe is to be fully restrained?) per job spec “Pipe Joints“ Sheet # 99.

A5. See revisions to special provisions in Addendum 3.

Q6. Clarify exactly what type of Ductile fittings are to be used for the C-909 waterline. The plans, job specs and payment specs conflict.

A6. See revisions to special provisions in Addendum 3.

Item #11. Page 412
Meeting Date: 9/13/2022 / Packet Page #: 643
Construction Contract Award
.CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and
Newburg St Area Water and Street Improvement
Project, Plan No. 1327
Public Works, Engineering
City Council
September 13, 2022
Alison Sweet, Director of Engineering
CityOfGlendora.org
Item #11. Page 413
Meeting Date: 9/13/2022 / Packet Page #: 644
2 PROJECT VICINITY MAP Item #11. Page 414
Meeting Date: 9/13/2022 / Packet Page #: 645

PAVEMENT CONDITION INDEX (PCI) IMPACT
Street From/To
2020
Pavement Management Plan
PCI
Bender Ave. Juanita Ave. to Newburgh St. 62
Bender Ave. Newburgh St. to Carter Dr. 66
Carter Dr. Bender Ave. to Santa Fe Ave. 66
Carter Dr. Bender Ave. to Calmgrove Ave. 83
Newburgh St. Bender Ave. to Santa Fe Ave. 69
Pennsylvania Ave. Newburgh St. to Carter Dr. 69
Santa Fe Ave. Juanita Ave. to Newburgh St. 65
Santa Fe Ave. Newburgh St. to Carter Dr. 70
Vermont Ave. Newburgh St. to Carter Dr. 68
Washington Ave. Newburgh St. to Carter Dr. 68
3 Item #11. Page 415
Meeting Date: 9/13/2022 / Packet Page #: 646
4 PROJECT SCOPE
• Install 6,600 linear feet of new PVC C-909 water mains and abandon existing mains.
• Replacing 31 ADA curb ramps.
• Reconstructing damaged sidewalk, curb, and gutter.
• Cold mill pavement and construct asphalt rubber hot mix (ARHM) pavement.

Item #11. Page 416
Meeting Date: 9/13/2022 / Packet Page #: 647
5 PROJECT AWARD
• Bid Opening on July 21, 2022.
• Two (2) responsive bids were received.
• Engineer’s Estimate $2,620,150.
• Bids ranged from $2,346,900 to $2,707,200.
• Award to Dominguez General Engineering, Inc. of Pomona, CA.

Item #11. Page 417
Meeting Date: 9/13/2022 / Packet Page #: 648
6 PROJECT TIMELINE
• Award of Contract: September 13, 2022
• Construction Duration: 100 Working Days
• Expected Construction Start: October 17, 2022
• Expected Completion: March 31, 2023
Item #11. Page 418
Meeting Date: 9/13/2022 / Packet Page #: 649
7 PROJECT PROBABLE COST
Task Budget Proposed Expenditures
Available Project Budget $2,826,173
Environmental $75
Construction – Dominguez General Engineering, Inc $2,581,590 Meters and meter boxes $23,720
Inspection – Consultant to be selected (estimated cost) $150,000 Material Testing - Consultant to be selected (estimated cost) $20,000 Total $2,775,385
Remaining Budget $50,788
Item #11. Page 419
Meeting Date: 9/13/2022 / Packet Page #: 650
8 RECOMMENDATIONS

1. Adopt a Categorical Exemption from the California Environmental Quality Act pursuant to Section 15301(c) of the California Code of Regulations;

2. Approve the Plans and Specifications, including Addenda No 1, 2, and 3 for CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and Newburg St Area Water and Street Improvement Project, Plan No. 1327 in District No 1;

3. Award the contract to Dominguez General Engineering, Inc for CDBG Bender Avenue, Carter Dr, Santa Fe Ave, and Newburg St Area Water and Street Improvement Project, Plan No. 1327 in the amount of $2,346,900 with a 10% contingency in the amount of $234,690 for a total amount of $2,581,590;

4. Authorize the Public Works Director to execute any necessary change orders in an amount not to exceed 10% of the original contract amount; and

5. Authorize the City Manager or his designee to execute the agreement including minimal and/or non-substantive changes.

That the City Council:

Item #11. Page 420
Meeting Date: 9/13/2022 / Packet Page #: 651