Cities Index.
Agenda packet

Glendora City Council
September 24, 2024

Document
Agenda packet
Meeting
September 24, 2024
Body
Glendora City Council
Pages
277
Original file
218.9 MB
Text extracted from the city's file for reading and search. Open the original on meetings.ci.glendora.ca.us. That file is the official record.

P1. Other Identifier:

P2. Location:  Not for Publication  Unrestricted
a. County: Los Angeles
b. USGS 7.5' Quad: Glendora Date: T ; R ; ¼ of ¼ of Sec ; S.B.B.M. c. Address: 723-745 E. Route 66 City: Glendora Zip: 91740 d. UTM: Zone: ; mE/ mN
e. Other Locational Data: APNs: 8646-029-009 and 8646-029-024. Original address: 723 E. Alosta (Hwy. 66) and 731 E. Alosta (Hwy. 66).

P3a. Description:

Built in ca. 1964, this 1-story commercial building is an example of a Vernacular style with a Mansard roof. The buildings footprint is irregular in shape. The building consists of two wings connected by a drive through overhang.

The original portion of the building is the rectangular shaped west wing (ca. 1964). By 1972, the L-shaped east wing is constructed and is connected to the west wing by the drive-through overhang. The front (south) façade of the building consists of a Mansard roof clad in red Spanish tiles (some tiles are missing). The exterior of the building consists of both exposed cinderblock and stucco clad cinderblock walls. The windows and doors are steel framed with large glass panes. Store front windows are large and rectangular shaped; six out of these seven large windows visible from the street are one-over-one fixed windows, the sixth window is two-over-two. Two smaller rectangular windows are present at the east elevation of the building’s east wing. See Continuation Sheet.

P3b. Resource Attributes: HP6. 1-story commercial building P4. Resources Present: Building Structure Object Site District Element of District Other P5b. Description of Photo:

Overview of south façade,
facing northwest
P6. Date Constructed/Age
and Sources: Historic
Prehistoric Both
Ca. 1964
P7. Owner and Address:

P8. Recorded by:

Cogstone Resource
Management, Inc; 1518 W Taft
Ave, Orange, CA 92865
P9. Date Recorded:

April 10, 2024
P10. Survey Type: Intensive
Pedestrian Survey
P11. Report Citation:

Attachments: NONE Location Map Sketch Map Continuation Sheet Building, Structure, and Object Record Archaeological Record District Record Linear Feature Record Milling Station Record Rock Art Record Artifact Record Photograph Record  Other
Item #6. Page 390
Meeting Date: 9/24/2024 / Packet Page #: 526
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION Trinomial

BUILDING, STRUCTURE, AND OBJECT RECORD
DPR 523B (9/2013) *Required information

Page 2 of 11 ends

B1. Historic Name: HONDA Glendora and George Dye Motors, Inc.

B2. Common Name:

B3. Original Use: Automotive commercial building
B4. Present Use: Vaccant
*B5. Architectural Style: Vernacular with Mansard Roof
*B6. Construction History: The building was originally a rectangular shaped building (built ca. 1964) located at the western side of the parcel. By 1972, a large addition is constructed to the east of the original building which consists of an L-shaped building with 2-3 office units and a drive through overhang which physically connects the two wings into a single building. From ca. 1966-1980s, the building was co-habitated by two commercial automotive companies:

HONDA Glendora and George Dye Motors, Inc..
*B7. Moved? No Yes Unknown Date: Original Location:
*B8. Related Features:

B9a. Architect: Not known b. Builder: Not Known
*B10. Significance: None Theme: Local Commercial Development Area: Glendora, CA Period of Significance: ca. 1964-ca. 1986 Property Type: Commercial Applicable Criteria: None Integrity: The original design of this building consisted of a single-story rectangular building with a flat roof and parapet.

The L-shapped additions to the building while not original, are now historic in age in their own right and now considered part of the history of the building. The condition of the existing building materials is in fair to poor condition due to missing materials and deterioration/damage.

Criteria A/1
Is this resource associated with events that have made a significant contribution to the broad patterns of history?
The existing property has been consistently used for local and small scale automotive commerce. A search of historic newspaper articles and business listings associated within this property indicated no known association with events considered historically significant. Therefore, this resource is recommended not eligible for listing in the National Register of Historic Places (NRHP) under Criterion A or the California Register of Historic Resource (CRHR) under Criterion 1.

B11. Additional Resource Attributes:
*B12. References:

See Continuation Sheet
B13. Remarks:
*B14. Evaluator: Shannon Lopez
*Date of Evaluation: March 25, 2024
Item #6. Page 391
Meeting Date: 9/24/2024 / Packet Page #: 527
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
LOCATION MAP Trinomial
DPR 523J (9/2013) *Required information

Page 3 of 11 ends

Map Name: Glendora *Scale: 1:24,000 *Date of Map: 1995
Item #6. Page 392
Meeting Date: 9/24/2024 / Packet Page #: 528
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 4 of 11 ends

P3a. Description:

The west wing of the building represents the overall building’s original structure. This section consists of cinderblock exterior walls at the west, north, and south elevations. The southern half of the east elevation is comprised of cinderblock with a garage door (not historic in age) and wood paneled double doors. The northern half of the east elevation is clad in woodboard with the associated pedestrian doors and window openings boarded over. At the north end of the north elevation is a single pedestrian woodboard door.

History of Occupation:
• 1952-ca. 1968: A coffee shop (building is no longer extant) is advertised at “731 E. Alosta (Highway 66)” (APN: 8646-029-014) (Pasadena Independent 1952 and Independent Star-News 1968). • 1966: On January 9, 1966, two business are advertised at 723 E. Alosta (APN: 8646-029-009): HONDA Glendora and George Dye Motors (The Los Angeles Times 1966). • 1967: In 1967, the address for APN: 8646-029-009 is clarified as “723 E. Alosta (Highway 66)” (The Los Angeles Times 1967).
• 1985/1986: The last known newspaper advertisements for HONDA Glendora at 723 E. Alosta Ave. is from January 17, 1985 (The East Whittier Review 1985).
• 1992: Property is taken over by Andrew’s Auto Center LLC, family owned and operated (Yelp .n.d.). • 2015/2016: Andrew’s Auto Center LLC is permanently closed (Google Maps 2015 and 2016). • 2016/2017: The property is occupied by Pauls’ Auto & RV Sales (Google Maps 2016 and 2017). The unit at the eastern most end of the building is assigned the address “745 E. Rte 66”. • 2021/2022-Present: The property is vacant (Google Maps 2021/2022). *B10. Significance:

Criteria B/2
Is this resource associated with the lives of significant persons of the past? The existing property has been consistently used for local and small scale automotive commerce. A search of historic newpaper articles and business listings associated within this property indicated no known association with the lives of a person or persons considered significant to history. Therefore, this resource is recommended not eligible for listing in the NRHP under Criterion B or the CRHR under Criterion 2.

Criteria C/3
Does this resource embody distinctive characteristics of type, period, or method of construction or represent the work of a master, or possess high artistic value, or represent a significant and distinguishable entity those components may lack individual distinction.

This building is a basic representation of a Vernacular style commercial building with a Mansard roof. This building is not an exemplary representation of an architectural style, period, or method of construction, nor does it represent the work of a master. Therefore, this building is recommended not eligible for listing in the NRHP under Criterion C or the CRHR under Criterion 3.

Criteria D/4
Does this building yield or may likely yield information important in history or prehistory? Criterion 4 is most often applied to archaeological sites and districts but can also apply to buildings, structures, and/or objects. This resource does not exhibit a local variation of a standard design or construction technique that can yield important information (such as construction expertise or availability of local materials). Therefore, this building is recommended not eligible for listing in the NRHP under Criterion D or the CRHR under Criterion 4.

Item #6. Page 393
Meeting Date: 9/24/2024 / Packet Page #: 529
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 5 of 11 ends

REFERENCES
The Independent Star-News
1968 “Little Hot Spot”. Independent Star-News (Pasadena, California). Published: Sunday, June 2, 1968. Page 35.

Available at: https://www.newspapers.com/image/31810307. Accessed: March 11, 2024.

The East Whittier Review
1985 “Cashier”. The East Whittier Review (Whittier Review, California). Published: Thursday, January 17, 1985.

Page 9 ends

Google Maps
2015 “731 E. Rte 66”. Google Maps: Street View. Available at: https://www.google.com/maps. Accessed: March 25, 2024.
2016 “745 E. Rte 66”. Google Maps: Street View. Available at: https://www.google.com/maps. Accessed: March 25, 2024.
2017 “745 E. Rte 66”. Google Maps: Street View. Available at: https://www.google.com/maps. Accessed: March 25, 2024.
2021 “745 E. Rte 66”. Google Maps: Street View. Available at: https://www.google.com/maps. Accessed: March 25, 2024.
2022 “745 E. Rte 66”. Google Maps: Street View. Available at: https://www.google.com/maps. Accessed: March 25, 2024.

The Los Angeles Times
1966 “HONDA Glendora”. The Los Angeles Times (Los Angeles, California). Published: Sunday, January 9, 1966.

Page 277 ends

1967 “Honda Glendora Clerance Sale”. The Los Angeles Times (Los Angeles, California). Published: Thursday, March 2, 1967. Page 143. Available at: https://www.newspapers.com/image/382473383. Accessed: March 8, 2024.

Pasadena Independent
1952 “Coffee shop”. Pasadena Independent (Pasadena, California). Published: Wednesday, August 6, 1952. Page

25. Available at: https://www.newspapers.com/image/619861627. Accessed: March 11, 2024.

Yelp
n.d. “Andy’s Auto Center”. Available at: https://www.yelp.com/biz/andys-auto-center-glendora. Accessed: April 17, 2024.

Item #6. Page 394
Meeting Date: 9/24/2024 / Packet Page #: 530
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 6 of 11 ends

Survey Photo Key
Item #6. Page 395
Meeting Date: 9/24/2024 / Packet Page #: 531
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 9 of 11 ends

1. Eastern side of south façade.

2. Western side of south façade.

Item #6. Page 396
Meeting Date: 9/24/2024 / Packet Page #: 532
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 8 of 11 ends

3. East elevation, facing west.

4. West elevation, facing northeast.

Item #6. Page 397
Meeting Date: 9/24/2024 / Packet Page #: 533
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 9 of 11 ends

5. East elevation of original ca. 1964 building section.

6. north elevation of original ca. 1964 building section.

Item #6. Page 398
Meeting Date: 9/24/2024 / Packet Page #: 534
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 10 of 11 ends

7. Drive through overhang connecting the original ca. 1964 building section and the ca. 1970s building addition.

8. Ceiling of drive-through overhang (top) and west elevation of ca. 1970s addition (center).

Item #6. Page 399
Meeting Date: 9/24/2024 / Packet Page #: 535
State of California ⎯ The Resources Agency Primary #
DEPARTMENT OF PARKS AND RECREATION HRI#
CONTINUATION SHEET Trinomial
DPR 523L (9/2013) *Required information

Page 11 of 11 ends

9. Fixed steel car ramp accompined by an elevated concrete platform. 1966 advertisement for HONDA Glendora and George Dye Motors (The Los Angeles Times 1966).

Item #6. Page 400
Meeting Date: 9/24/2024 / Packet Page #: 536
Initial Study/Mitigated Negative Declaration July 2024
Brandywine Route 66 Residential – PLN 23-0027

Page 161 ends

Appendix D
723-745 East Route 66 Multi-Family Residential Development Energy Letter – City of Glendora
Ldn Consulting, Inc.

December 8, 2023
Item #6. Page 401
Meeting Date: 9/24/2024 / Packet Page #: 537
23811 Washington Ave, C110-333, Murrieta, CA 92562 phone 760-473-1253 12/8/2023 1 23-67 723-745 Route 66 Glendora Energy
December 8, 2023
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
RE: 723-745 Route 66 Multi-Family Residential Development Energy Letter – City of Glendora
This analysis evaluates both construction and operational energy efficiency as it relates to nonrenewable fuel sources including Electrical, Natural Gas, Diesel and Gasoline for the proposed 723-745 Route 66 Multi-Family Residential Development. This effort was prepared according to requirements established within Public Resource Code (PRC) Section 21100(b)(3) and California Environmental Quality Act (CEQA) Guidelines Section 15126.4. The intent is to adequately address the following CEQA question:

Would the project:

1. Result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?

2. Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Project Description
The project proposes the construction of six 3-story multi-family residential buildings consisting of 39 townhomes/flats within a 1.85-acre project site. The current use of the Project area is a Vehicle Service and sales lot with an existing 6,000 Square Foot building onsite.

The Project is expected to begin demolition of the existing building and lot mid-year 2024 and start construction shortly thereafter. Construction completion and operations would be expected sometime in 2025.

Construction
Energy usage for construction equipment is best estimated using total horsepower hours and an assumed thermal efficiency of 30%. The most common measure of the energy efficiency of a tractor is referred to here as “specific volumetric fuel consumption” (SVFC), which is given in units of gallons per horsepower-hour (gal/hp-h). SVFC for diesel engines typically ranges from Item #6. Page 402
Meeting Date: 9/24/2024 / Packet Page #: 538
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 2 23-67 723-745 Route 66 Glendora Energy

0.0476 to 0.1110 gal/hp-h. Inverting these numbers yields a range of between 12-21 hp-h/gal.

Over the last 30 years, fuel efficiency at maximum power has increased from roughly 14.5 to

16.5 hp-h/gal (VirginiaTech, 2010).

Project construction dates were estimated using CalEEMod and follow assumptions identified in both the Project Air Quality and Greenhouse Gas (GHG) analysis. Based on this, an estimated construction kickoff starting in 2024 and completing the project roughly one year later. Based on the equipment, quantity, work time, Horsepower (HP), the project would require a total of 364,242 hp-h (See Table 1 on the following page). Based on this, the project would consume roughly 22,075.27 gallons of diesel for construction. It should be noted that fuel consumption would go up if diesel construction equipment is poorly maintained. Based on this, the project shall properly maintain all equipment per manufacture recommendations. The model is provided as Attachments A to this report. Conservatively, modeling assumed 43 units as a worst case scenario.

Construction energy from workers, vendors and haulage are based on the estimated vehicle miles traveled (VMT) for the total construction duration which is 134,564 miles for the Project.

In California, the average fuel intensity for on-road vehicles is 0.0615 gal/mile (University of California, Irvine, 2005). Based on this, vehicular trips would consume roughly 8,275.70 gallons during construction.

On-road vehicles are regulated by state and federal regulations and vehicular fleet efficiencies are getting better each year. Additionally, all construction equipment shall be maintained as needed per the manufacturers’ recommendations. Given this, the Project would have a less than significant impact on short term energy demand during construction.

Item #6. Page 403
Meeting Date: 9/24/2024 / Packet Page #: 539
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 3 23-67 723-745 Route 66 Glendora Energy
Table 1: Proposed Construction Phase and Duration
Equipment Identification Construction
Days
Hours
per day HP Load Factor Quantity Horsepower Hours
Demolition 20
Tractors/Loaders/Backhoes 8 84 0.37 3 14,918.40
Rubber Tired Dozers 8 367 0.4 1 23,488.00
Concrete/Industrial Saws 8 33 0.73 1 3,854.40
Site Preparation 3
Graders 8 187 0.41 1 1,840.08
Rubber Tired Dozers 8 367 0.48 1 4,227.84
Tractors/Loaders/Backhoes 7 97 0.37 1 753.69
Grading 4
Graders 8 148 0.41 1 1,941.76
Tractors/Loaders/Backhoes 7 84 0.37 2 1,740.48
Rubber Tired Dozers 8 367 0.4 1 4,697.60
Building Construction 200
Cranes 6 367 0.29 1 127,716.00
Forklifts 6 82 0.2 1 19,680.00
Generator Sets 8 14 0.74 1 16,576.00
Tractors/Loaders/Backhoes 6 84 0.37 1 37,296.00
Welders 8 46 0.45 3 99,360.00
Paving 10
Tractors/Loaders/Backhoes 8 84 0.37 1 2,486.40
Pavers 6 81 0.42 1 2,041.20
Paving Equipment 8 89 0.36 1 2,563.20
Rollers 7 36 0.38 1 957.60
Cement and Mortar Mixers 6 10 0.56 1 336.00
Architectural Coating 10
Air Compressors 6 37 0.48 1 1,065.60
Total Horsepower Hours 364,242.00
Total Diesel Fuel (Gal) @ 16.5 hp-h/gal 22,075.27
This equipment list is based upon equipment inventory and estimates within CalEEMod 2022.1.

Operations
Energy – Utility Demand
The State of California has implemented a number of energy reducing policies largely geared to reducing Greenhouse gasses (GHGs). The most notable is Assembly Bill (AB) 32, Senate Bill (SB) Item #6. Page 404
Meeting Date: 9/24/2024 / Packet Page #: 540
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 4 23-67 723-745 Route 66 Glendora Energy
32, and Executive Order (EO) S-3-05. In addition, the state has implemented two scoping plan updates which are geared to reduce GHG emissions by reducing energy consumption, increasing energy efficiency and increasing the usage of renewable sources. The state has also taken a strong steps in increasing building efficiencies under Title 24, par 6 of California’s Code of Regulations. The Project would be required, at a minimum, to comply with the latest version of Title 24 standards at the time the Project seeks building permits. At the time this report was written, the 2022 standards were applicable and went into effect on January 1, 2023. The 2023 standards continue to improve upon the 2019 standards for residential and nonresidential buildings. It should be noted that the State updates these regulations every three years.

In addition to the CEC’s efforts, in 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (Part 11 of Title 24) is commonly referred to as CALGreen and establishes minimum mandatory standards as well as voluntary standards pertaining to the planning and design of sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and interior air quality. The current CALGreen standards were last updated in 2022 and went into effect January 1, 2023. CALGreen standards include mandatory measures for planning and design, energy efficiency, water and conservation efficiency, material and resource conservation as well as Environmental Quality (California Title 24, Part 11, 2022).

Finally, the state has implemented a number of regulations which force electrical utility providers to increase renewable portfolios or procurement. Specifically, the following policies and how they shaped the current energy supply and the future energy horizon are noted below:

SB 1078 (2002) established the Renewables Portfolio Standard (RPS) program, which requires an annual increase in renewable generation by the utilities equivalent to at least 1 percent of sales, with an aggregate goal of 20 percent by 2017. This goal was subsequently accelerated, requiring utilities to obtain 20 percent of their power from renewable sources by 2010.

SB X1 2 (2011) expanded the RPS by establishing that 20 percent of the total electricity sold to retail customers in California per year by December 31, 2013, and 33 percent by December 31, 2020, and in subsequent years be secured from qualifying renewable energy sources. Under the bill, a renewable electrical generation facility is one that uses biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells using renewable fuels, small hydroelectric generation of 30 megawatts or less, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and that meets other specified requirements with respect to its location. In addition to the retail sellers previously covered by the RPS, SB X1 2 added local, publicly owned electric utilities to the RPS.

Item #6. Page 405
Meeting Date: 9/24/2024 / Packet Page #: 541
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 5 23-67 723-745 Route 66 Glendora Energy
SB 350 (2015) further expanded the RPS by establishing that 50 percent of the total electricity sold to retail customers in California per year by December 31, 2030 be secured from qualifying renewable energy sources. In addition, SB 350 includes the goal to double the energy efficiency savings in electricity and natural gas final end uses (such as heating, cooling, lighting, or class of energy uses on which an energy-efficiency program is focused) of retail customers through energy conservation and efficiency.

SB 100 (2018) has further accelerated and expanded the RPS, requiring achievement of a 50 percent RPS by December 31, 2026 and a 60 percent RPS by December 31, 2030. SB 100 also established a new statewide policy goal that calls for eligible renewable energy resources and zero-carbon resources to supply 100 percent of electricity retail sales and 100 percent of electricity procured to serve all state agencies by December 31, 2045.

Based on the results, the Project is estimated to consume 207,003 kWh of electricity and 1,033,305 kBTU of natural gas annually. Under this analysis, reductions from Title 24 California Building Code are assumed.

Energy – Vehicular Usage
The Project traffic emissions were calculated using CalEEMod which provides a decent approximation for annual vehicular usage during normal operations. Based on CalEEMod outputs provided as Attachment A to this letter, the Project would have approximately 1,034,489 annual miles traveled. According to the US EPA, every gallon of gasoline burned creates about 8,887 grams of CO2 (US EPA, 2023). Based on the modeling provided in Attachment A to this report, the Project would generate 371 MT CO2. Since 1 MT = 1 million grams, the estimated 371,000,000 grams of CO2 would equate to roughly 41,746 gallons of fuel annually (371,000,000/8,887). Since on-road vehicles are regulated by state and federal regulations and vehicular fleet efficiencies are getting better each year a less than significant impact would be expected on energy resources.

Executive Order (EO) B-16-12
In March 2012 EO B-16-12 directs state entities under the Governor’s direction and control to support and facilitate development and distribution of ZEVs. This EO also sets a long-term target of reaching 1.5 million zero-emission vehicles on California’s roadways by 2025. On a statewide basis, EO B-16-12 also establishes a GHG emissions reduction target from the transportation sector equaling 80 percent less than 1990 levels by 2050. In furtherance of this EO, the Governor convened an Interagency Working Group on Zero-Emission Vehicles that has published multiple reports regarding the progress made on the penetration of ZEVs in the statewide vehicle fleet.

Item #6. Page 406
Meeting Date: 9/24/2024 / Packet Page #: 542
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 6 23-67 723-745 Route 66 Glendora Energy
California Senate Bill 350
In 2015, SB 350 – the Clean Energy and Pollution Reduction Act – was enacted into law. As one of its elements, SB 350 establishes a statewide policy for widespread electrification of the transportation sector, recognizing that such electrification is required for achievement of the state’s 2030 and 2050 reduction targets (see Public Utilities Code Section 740.12).

Conclusion
Based on this analysis, the long-term energy demand during operations of the project would not result in a wasteful or inefficient use of energy. As RPS increases and as electric vehicle operations become more standardized, energy consumption and efficiency will decrease. Given this, a less than significant impact under CEQA with respect to Energy Waste. Furthermore, the project would not conflict with or obstruct the State’s or Local plans for renewable energy or energy efficiency.

Sincerely,
Ldn Consulting, Inc.

Jeremy Louden
Attachment A: CalEEMod analysis tool (Proposed Project) References:

California Title 24, Part 11. (2022). Retrieved from
https://www.dgs.ca.gov/BSC/Resources/2022-Title-24-California-Code-Changes University of California, Irvine. (2005). Fuel Efficiency and Motor Vehicle Travel. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.367.2859&rep=rep1&type=pdf US EPA. (2023). Greenhouse Gas Emissions from a Typical Passenger Vehicle. Retrieved from https://www.epa.gov/greenvehicles/greenhouse-gas-emissions-typical-passengervehicle#:~:text=typical%20passenger%20vehicle%3F- ,A%20typical%20passenger%20vehicle%20emits%20about%204.6%20metric%20tons%2 0of,8%2C887%20grams%20of%20CO2.

VirginiaTech. (2010). Predicting Tractor Diesel Fuel Consumption. Retrieved from https://pdfs.semanticscholar.org/2631/d1ae4f63bcf1b067e69804f904968f318571.pdf Item #6. Page 407
Meeting Date: 9/24/2024 / Packet Page #: 543
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 1 / 79
723-745 Route 66 Multi-Family Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

2.3. Construction Emissions by Year, Mitigated

2.4. Operations Emissions Compared Against Thresholds

2.5. Operations Emissions by Sector, Unmitigated

2.6. Operations Emissions by Sector, Mitigated

3. Construction Emissions Details

3.1. Demolition (2024) - Unmitigated

3.2. Demolition (2024) - Mitigated
Item #6. Page 408
Meeting Date: 9/24/2024 / Packet Page #: 544
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 2 / 79

3.3. Site Preparation (2024) - Unmitigated

3.4. Site Preparation (2024) - Mitigated

3.5. Grading (2024) - Unmitigated

3.6. Grading (2024) - Mitigated

3.7. Building Construction (2024) - Unmitigated

3.8. Building Construction (2024) - Mitigated

3.9. Building Construction (2025) - Unmitigated

3.10. Building Construction (2025) - Mitigated

3.11. Paving (2025) - Unmitigated

3.12. Paving (2025) - Mitigated

3.13. Architectural Coating (2025) - Unmitigated

3.14. Architectural Coating (2025) - Mitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.1.2. Mitigated

4.2. Energy
Item #6. Page 409
Meeting Date: 9/24/2024 / Packet Page #: 545
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 3 / 79

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.2. Electricity Emissions By Land Use - Mitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.2.4. Natural Gas Emissions By Land Use - Mitigated

4.3. Area Emissions by Source

4.3.1. Unmitigated

4.3.2. Mitigated

4.4. Water Emissions by Land Use

4.4.1. Unmitigated

4.4.2. Mitigated

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated

4.5.2. Mitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.6.2. Mitigated

4.7. Offroad Emissions By Equipment Type
Item #6. Page 410
Meeting Date: 9/24/2024 / Packet Page #: 546
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 4 / 79

4.7.1. Unmitigated

4.7.2. Mitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.8.2. Mitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.9.2. Mitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated

4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated

4.10.6. Avoided and Sequestered Emissions by Species - Mitigated

5. Activity Data

5.1. Construction Schedule
Item #6. Page 411
Meeting Date: 9/24/2024 / Packet Page #: 547
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 5 / 79

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.2.2. Mitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.3.2. Mitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.9.2. Mitigated
Item #6. Page 412
Meeting Date: 9/24/2024 / Packet Page #: 548
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 6 / 79

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.1.2. Mitigated

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.10.4. Landscape Equipment - Mitigated

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.11.2. Mitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.12.2. Mitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.13.2. Mitigated

5.14. Operational Refrigeration and Air Conditioning Equipment Item #6. Page 413
Meeting Date: 9/24/2024 / Packet Page #: 549
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 7 / 79

5.14.1. Unmitigated

5.14.2. Mitigated

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.15.2. Mitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1.2. Mitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.1.2. Mitigated

5.18.2. Sequestration
Item #6. Page 414
Meeting Date: 9/24/2024 / Packet Page #: 550
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 8 / 79

5.18.2.1. Unmitigated

5.18.2.2. Mitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
Item #6. Page 415
Meeting Date: 9/24/2024 / Packet Page #: 551
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 9 / 79

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name 723-745 Route 66 Multi-Family
Construction Start Date 6/1/2024
Operational Year 2025
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.80
Precipitation (days) 13.2
Location 723-745 E Rte 66, Glendora, CA 91740, USA
County Los Angeles-South Coast
City Glendora
Air District South Coast AQMD
Air Basin South Coast
TAZ 5049
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.20

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Item #6. Page 416
Meeting Date: 9/24/2024 / Packet Page #: 552
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 10 / 79
Condo/Townhouse 43.0 Dwelling Unit 1.55 45,580 0.75 — 127 — Parking Lot 30.0 Space 0.25 0.00 0.00 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure Title
Construction C-6 Use Diesel Particulate Filters

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 29.5 12.8 15.6 0.03 0.57 2.89 3.35 0.52 1.37 1.78 — 2,913 2,913 0.12 0.07 2.28 2,937 Mit. 29.5 12.8 15.6 0.03 0.09 2.89 2.96 0.08 1.37 1.43 — 2,913 2,913 0.12 0.07 2.28 2,937 %
Reduced
— — — — 85% — 12% 85% — 20% — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.57 10.4 12.5 0.02 0.50 0.44 0.95 0.46 0.11 0.57 — 2,364 2,364 0.10 0.05 0.06 2,381 Mit. 0.57 10.4 12.5 0.02 0.08 0.44 0.52 0.07 0.11 0.18 — 2,364 2,364 0.10 0.05 0.06 2,381 %
Reduced
— — — — 85% — 45% 85% — 69% — — — — — — —
Average
Daily
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 417
Meeting Date: 9/24/2024 / Packet Page #: 553
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 11 / 79
Unmit. 0.92 4.47 5.43 0.01 0.21 0.22 0.43 0.19 0.06 0.25 — 1,016 1,016 0.04 0.02 0.35 1,024 Mit. 0.92 4.47 5.43 0.01 0.03 0.22 0.25 0.03 0.06 0.09 — 1,016 1,016 0.04 0.02 0.35 1,024 %
Reduced
— — — — 85% — 41% 85% — 64% — — — — — — —
Annual
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.17 0.82 0.99 < 0.005 0.04 0.04 0.08 0.04 0.01 0.05 — 168 168 0.01 < 0.005 0.06 169 Mit. 0.17 0.82 0.99 < 0.005 0.01 0.04 0.05 0.01 0.01 0.02 — 168 168 0.01 < 0.005 0.06 169 %
Reduced
— — — — 85% — 41% 85% — 64% — — — — — — —

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 12.8 15.6 0.03 0.54 2.89 3.35 0.49 1.37 1.78 — 2,913 2,913 0.12 0.07 2.13 2,937 2025 29.5 11.5 14.1 0.02 0.57 0.52 1.10 0.52 0.12 0.65 — 2,594 2,594 0.11 0.05 2.28 2,615 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 10.4 12.5 0.02 0.50 0.44 0.95 0.46 0.11 0.57 — 2,364 2,364 0.10 0.05 0.06 2,381 2025 0.56 10.4 12.4 0.02 0.50 0.44 0.95 0.46 0.11 0.57 — 2,353 2,353 0.10 0.05 0.05 2,370 Average
Daily
— — — — — — — — — — — — — — — — —
2024 0.23 4.47 5.43 0.01 0.21 0.22 0.43 0.19 0.06 0.25 — 1,016 1,016 0.04 0.02 0.35 1,024 2025 0.92 2.31 2.80 < 0.005 0.11 0.10 0.21 0.10 0.02 0.13 — 522 522 0.02 0.01 0.19 526 Annual — — — — — — — — — — — — — — — — —
2024 0.04 0.82 0.99 < 0.005 0.04 0.04 0.08 0.04 0.01 0.05 — 168 168 0.01 < 0.005 0.06 169 Item #6. Page 418
Meeting Date: 9/24/2024 / Packet Page #: 554
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 12 / 79
2025 0.17 0.42 0.51 < 0.005 0.02 0.02 0.04 0.02 < 0.005 0.02 — 86.5 86.5 < 0.005 < 0.005 0.03 87.1

2.3. Construction Emissions by Year, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 12.8 15.6 0.03 0.08 2.89 2.96 0.08 1.37 1.43 — 2,913 2,913 0.12 0.07 2.13 2,937 2025 29.5 11.5 14.1 0.02 0.09 0.52 0.61 0.08 0.12 0.20 — 2,594 2,594 0.11 0.05 2.28 2,615 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 10.4 12.5 0.02 0.08 0.44 0.52 0.07 0.11 0.18 — 2,364 2,364 0.10 0.05 0.06 2,381 2025 0.56 10.4 12.4 0.02 0.08 0.44 0.52 0.07 0.11 0.18 — 2,353 2,353 0.10 0.05 0.05 2,370 Average
Daily
— — — — — — — — — — — — — — — — —
2024 0.23 4.47 5.43 0.01 0.03 0.22 0.25 0.03 0.06 0.09 — 1,016 1,016 0.04 0.02 0.35 1,024 2025 0.92 2.31 2.80 < 0.005 0.02 0.10 0.11 0.02 0.02 0.04 — 522 522 0.02 0.01 0.19 526 Annual — — — — — — — — — — — — — — — — —
2024 0.04 0.82 0.99 < 0.005 0.01 0.04 0.05 0.01 0.01 0.02 — 168 168 0.01 < 0.005 0.06 169 2025 0.17 0.42 0.51 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 0.01 — 86.5 86.5 < 0.005 < 0.005 0.03 87.1

2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 419
Meeting Date: 9/24/2024 / Packet Page #: 555
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 13 / 79
Unmit. 2.50 1.23 13.3 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 3,085 3,105 2.20 0.11 9.68 3,202 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 2.27 1.30 9.99 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 2,971 2,992 2.20 0.12 0.57 3,081 Average
Daily
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 2.28 1.21 10.9 0.02 0.04 1.99 2.03 0.04 0.51 0.54 20.2 2,747 2,767 2.19 0.10 3.94 2,857 Annual
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.42 0.22 1.98 < 0.005 0.01 0.36 0.37 0.01 0.09 0.10 3.34 455 458 0.36 0.02 0.65 473

2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Area 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.50 1.23 13.3 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 3,085 3,105 2.20 0.11 9.68 3,202 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Item #6. Page 420
Meeting Date: 9/24/2024 / Packet Page #: 556
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 14 / 79
Area 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.27 1.30 9.99 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 2,971 2,992 2.20 0.12 0.57 3,081 Average
Daily
— — — — — — — — — — — — — — — — —
Mobile 1.06 0.94 9.09 0.02 0.01 1.99 2.01 0.01 0.51 0.52 — 2,204 2,204 0.11 0.09 3.62 2,238 Area 1.21 0.02 1.67 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 4.47 4.47 < 0.005 < 0.005 — 4.48 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.28 1.21 10.9 0.02 0.04 1.99 2.03 0.04 0.51 0.54 20.2 2,747 2,767 2.19 0.10 3.94 2,857 Annual — — — — — — — — — — — — — — — — —
Mobile 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Area 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74 Energy < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 87.6 87.6 0.01 < 0.005 — 87.9 Water — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92 Waste — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90 Refrig. — — — — — — — — — — — — — — — 0.05 0.05
Total 0.42 0.22 1.98 < 0.005 0.01 0.36 0.37 0.01 0.09 0.10 3.34 455 458 0.36 0.02 0.65 473

2.6. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item #6. Page 421
Meeting Date: 9/24/2024 / Packet Page #: 557
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 15 / 79
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Area 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.50 1.23 13.3 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 3,085 3,105 2.20 0.11 9.68 3,202 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Area 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.27 1.30 9.99 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 2,971 2,992 2.20 0.12 0.57 3,081 Average
Daily
— — — — — — — — — — — — — — — — —
Mobile 1.06 0.94 9.09 0.02 0.01 1.99 2.01 0.01 0.51 0.52 — 2,204 2,204 0.11 0.09 3.62 2,238 Area 1.21 0.02 1.67 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 4.47 4.47 < 0.005 < 0.005 — 4.48 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.28 1.21 10.9 0.02 0.04 1.99 2.03 0.04 0.51 0.54 20.2 2,747 2,767 2.19 0.10 3.94 2,857 Item #6. Page 422
Meeting Date: 9/24/2024 / Packet Page #: 558
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 16 / 79
Annual — — — — — — — — — — — — — — — — —
Mobile 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Area 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74 Energy < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 87.6 87.6 0.01 < 0.005 — 87.9 Water — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92 Waste — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90 Refrig. — — — — — — — — — — — — — — — 0.05 0.05
Total 0.42 0.22 1.98 < 0.005 0.01 0.36 0.37 0.01 0.09 0.10 3.34 455 458 0.36 0.02 0.65 473

3. Construction Emissions Details

3.1. Demolition (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.47 12.5 14.6 0.02 0.53 — 0.53 0.48 — 0.48 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — 0.19 0.19 — 0.03 0.03 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Item #6. Page 423
Meeting Date: 9/24/2024 / Packet Page #: 559
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 17 / 79
Off-Road 0.03 0.68 0.80 < 0.005 0.03 — 0.03 0.03 — 0.03 — 137 137 0.01 < 0.005 — 137 Equipment
Demolitio
n
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.15 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 22.6 22.6 < 0.005 < 0.005 — 22.7 Demolitio
n
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.94 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 176 176 0.01 0.01 0.70 179 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 0.30 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 243 243 0.01 0.04 0.56 256 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.30 9.30 < 0.005 < 0.005 0.02 9.43 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13.3 13.3 < 0.005 < 0.005 0.01 14.0 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.54 1.54 < 0.005 < 0.005 < 0.005 1.56 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 2.21 2.21 < 0.005 < 0.005 < 0.005 2.32 Item #6. Page 424
Meeting Date: 9/24/2024 / Packet Page #: 560
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 18 / 79

3.2. Demolition (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.47 12.5 14.6 0.02 0.08 — 0.08 0.07 — 0.07 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — 0.19 0.19 — 0.03 0.03 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.03 0.68 0.80 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 137 137 0.01 < 0.005 — 137 Demolitio
n
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 22.6 22.6 < 0.005 < 0.005 — 22.7 Demolitio
n
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Item #6. Page 425
Meeting Date: 9/24/2024 / Packet Page #: 561
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 19 / 79
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.94 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 176 176 0.01 0.01 0.70 179 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 0.30 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 243 243 0.01 0.04 0.56 256 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.30 9.30 < 0.005 < 0.005 0.02 9.43 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13.3 13.3 < 0.005 < 0.005 0.01 14.0 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.54 1.54 < 0.005 < 0.005 < 0.005 1.56 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 2.21 2.21 < 0.005 < 0.005 < 0.005 2.32

3.3. Site Preparation (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.35 9.24 11.9 0.02 0.38 — 0.38 0.34 — 0.34 — 2,064 2,064 0.08 0.02 — 2,071 Item #6. Page 426
Meeting Date: 9/24/2024 / Packet Page #: 562
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 20 / 79
Dust — — — — — 2.44 2.44 — 1.17 1.17 — — — — — — —
From
Material
Movement
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.05 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.3 11.3 < 0.005 < 0.005 — 11.3 Dust
From
Material
Movement
— — — — — 0.01 0.01 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.87 1.87 < 0.005 < 0.005 — 1.88 Dust
From
Material
Movement
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.04 0.57 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 106 106 < 0.005 < 0.005 0.42 107 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 427
Meeting Date: 9/24/2024 / Packet Page #: 563
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 21 / 79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.56 0.56 < 0.005 < 0.005 < 0.005 0.57 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.09 0.09 < 0.005 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.4. Site Preparation (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.35 9.24 11.9 0.02 0.06 — 0.06 0.05 — 0.05 — 2,064 2,064 0.08 0.02 — 2,071 Dust
From
Material
Movement
— — — — — 2.44 2.44 — 1.17 1.17 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 428
Meeting Date: 9/24/2024 / Packet Page #: 564
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 22 / 79
Average — — — — — — — — — — — — — — — — —
Daily
Off-Road
Equipment
< 0.005 0.05 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.3 11.3 < 0.005 < 0.005 — 11.3 Dust
From
Material
Movement
— — — — — 0.01 0.01 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.87 1.87 < 0.005 < 0.005 — 1.88 Dust
From
Material
Movement
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.04 0.57 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 106 106 < 0.005 < 0.005 0.42 107 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.56 0.56 < 0.005 < 0.005 < 0.005 0.57 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 429
Meeting Date: 9/24/2024 / Packet Page #: 565
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 23 / 79
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.09 0.09 < 0.005 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.5. Grading (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 11.1 14.2 0.02 0.46 — 0.46 0.41 — 0.41 — 2,454 2,454 0.10 0.02 — 2,462 Dust
From
Material
Movement
— — — — — 2.76 2.76 — 1.34 1.34 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.16 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 26.9 26.9 < 0.005 < 0.005 — 27.0 Dust
From
Material
Movement
— — — — — 0.03 0.03 — 0.01 0.01 — — — — — — —
Item #6. Page 430
Meeting Date: 9/24/2024 / Packet Page #: 566
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 24 / 79
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.02 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.45 4.45 < 0.005 < 0.005 — 4.47 Dust
From
Material
Movement
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.04 0.05 0.75 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 141 141 0.01 < 0.005 0.56 143 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.49 1.49 < 0.005 < 0.005 < 0.005 1.51 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.25 0.25 < 0.005 < 0.005 < 0.005 0.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 431
Meeting Date: 9/24/2024 / Packet Page #: 567
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 25 / 79

3.6. Grading (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 11.1 14.2 0.02 0.07 — 0.07 0.06 — 0.06 — 2,454 2,454 0.10 0.02 — 2,462 Dust
From
Material
Movement
— — — — — 2.76 2.76 — 1.34 1.34 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.16 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 26.9 26.9 < 0.005 < 0.005 — 27.0 Dust
From
Material
Movement
— — — — — 0.03 0.03 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.02 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.45 4.45 < 0.005 < 0.005 — 4.47 Item #6. Page 432
Meeting Date: 9/24/2024 / Packet Page #: 568
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 26 / 79
Dust — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — — From
Material
Movement
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.04 0.05 0.75 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 141 141 0.01 < 0.005 0.56 143 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.49 1.49 < 0.005 < 0.005 < 0.005 1.51 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.25 0.25 < 0.005 < 0.005 < 0.005 0.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.7. Building Construction (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Item #6. Page 433
Meeting Date: 9/24/2024 / Packet Page #: 569
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 27 / 79
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.15 3.46 3.61 0.01 0.17 — 0.17 0.16 — 0.16 — 620 620 0.03 0.01 — 622 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.03 0.63 0.66 < 0.005 0.03 — 0.03 0.03 — 0.03 — 103 103 < 0.005 < 0.005 — 103 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.14 0.15 2.34 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 437 437 0.02 0.01 1.72 444 Vendor < 0.005 0.17 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.40 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 434
Meeting Date: 9/24/2024 / Packet Page #: 570
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 28 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Worker 0.14 0.18 1.97 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 414 414 0.02 0.02 0.04 419 Vendor < 0.005 0.18 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.01 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.05 0.06 0.72 0.00 0.00 0.14 0.14 0.00 0.03 0.03 — 145 145 0.01 0.01 0.26 147 Vendor < 0.005 0.06 0.03 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 51.1 51.1 < 0.005 0.01 0.06 53.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.13 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 24.0 24.0 < 0.005 < 0.005 0.04 24.3 Vendor < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 8.46 8.46 < 0.005 < 0.005 0.01 8.82 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.8. Building Construction (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 435
Meeting Date: 9/24/2024 / Packet Page #: 571
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 29 / 79
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.15 3.46 3.61 0.01 0.03 — 0.03 0.02 — 0.02 — 620 620 0.03 0.01 — 622 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.03 0.63 0.66 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 103 103 < 0.005 < 0.005 — 103 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.14 0.15 2.34 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 437 437 0.02 0.01 1.72 444 Vendor < 0.005 0.17 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.40 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.14 0.18 1.97 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 414 414 0.02 0.02 0.04 419 Vendor < 0.005 0.18 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.01 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.05 0.06 0.72 0.00 0.00 0.14 0.14 0.00 0.03 0.03 — 145 145 0.01 0.01 0.26 147 Vendor < 0.005 0.06 0.03 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 51.1 51.1 < 0.005 0.01 0.06 53.3 Item #6. Page 436
Meeting Date: 9/24/2024 / Packet Page #: 572
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 30 / 79
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.13 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 24.0 24.0 < 0.005 < 0.005 0.04 24.3 Vendor < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 8.46 8.46 < 0.005 < 0.005 0.01 8.82 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.9. Building Construction (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.09 2.07 2.15 < 0.005 0.10 — 0.10 0.09 — 0.09 — 370 370 0.02 < 0.005 — 371 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Item #6. Page 437
Meeting Date: 9/24/2024 / Packet Page #: 573
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 31 / 79
Off-Road
Equipment

0.02 0.38 0.39 < 0.005 0.02 — 0.02 0.02 — 0.02 — 61.3 61.3 < 0.005 < 0.005 — 61.5 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.13 2.15 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 428 428 0.02 0.01 1.57 434 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.40 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.15 1.83 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 406 406 0.02 0.02 0.04 411 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.01 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.39 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 84.6 84.6 < 0.005 < 0.005 0.14 85.7 Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 30.0 30.0 < 0.005 < 0.005 0.04 31.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.0 14.0 < 0.005 < 0.005 0.02 14.2 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.96 4.96 < 0.005 < 0.005 0.01 5.18 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.10. Building Construction (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item #6. Page 438
Meeting Date: 9/24/2024 / Packet Page #: 574
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 32 / 79
Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.09 2.07 2.15 < 0.005 0.02 — 0.02 0.01 — 0.01 — 370 370 0.02 < 0.005 — 371 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.38 0.39 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 61.3 61.3 < 0.005 < 0.005 — 61.5 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.13 2.15 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 428 428 0.02 0.01 1.57 434 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.40 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 439
Meeting Date: 9/24/2024 / Packet Page #: 575
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 33 / 79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.15 1.83 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 406 406 0.02 0.02 0.04 411 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.01 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.39 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 84.6 84.6 < 0.005 < 0.005 0.14 85.7 Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 30.0 30.0 < 0.005 < 0.005 0.04 31.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.0 14.0 < 0.005 < 0.005 0.02 14.2 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.96 4.96 < 0.005 < 0.005 0.01 5.18 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.11. Paving (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.19 5.26 6.65 0.01 0.23 — 0.23 0.21 — 0.21 — 992 992 0.04 0.01 — 995 Paving 0.26 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 440
Meeting Date: 9/24/2024 / Packet Page #: 576
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 34 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.01 0.14 0.18 < 0.005 0.01 — 0.01 0.01 — 0.01 — 27.2 27.2 < 0.005 < 0.005 — 27.3 Paving 0.01 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.50 4.50 < 0.005 < 0.005 — 4.51 Paving < 0.005 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.87 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 173 173 0.01 0.01 0.63 175 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 4.55 4.55 < 0.005 < 0.005 0.01 4.62 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Item #6. Page 441
Meeting Date: 9/24/2024 / Packet Page #: 577
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 35 / 79
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.75 0.75 < 0.005 < 0.005 < 0.005 0.76 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.12. Paving (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.19 5.26 6.65 0.01 0.03 — 0.03 0.03 — 0.03 — 992 992 0.04 0.01 — 995 Paving 0.26 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.01 0.14 0.18 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.2 27.2 < 0.005 < 0.005 — 27.3 Paving 0.01 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.50 4.50 < 0.005 < 0.005 — 4.51 Paving < 0.005 — — — — — — — — — — — — — — — —
Item #6. Page 442
Meeting Date: 9/24/2024 / Packet Page #: 578
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 36 / 79
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 truck
Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.87 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 173 173 0.01 0.01 0.63 175 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 4.55 4.55 < 0.005 < 0.005 0.01 4.62 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.75 0.75 < 0.005 < 0.005 < 0.005 0.76 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.13. Architectural Coating (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 443
Meeting Date: 9/24/2024 / Packet Page #: 579
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 37 / 79
Off-Road 0.05 1.09 0.96 < 0.005 0.07 — 0.07 0.06 — 0.06 — 134 134 0.01 < 0.005 — 134 Equipment
Architectu
ral
Coatings

28.8 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.66 3.66 < 0.005 < 0.005 — 3.67 Architectu
ral
Coatings

0.79 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.61 0.61 < 0.005 < 0.005 — 0.61 Architectu
ral
Coatings

0.14 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.43 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 85.6 85.6 < 0.005 < 0.005 0.31 86.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 444
Meeting Date: 9/24/2024 / Packet Page #: 580
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 38 / 79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.26 2.26 < 0.005 < 0.005 < 0.005 2.29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.37 0.37 < 0.005 < 0.005 < 0.005 0.38 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.14. Architectural Coating (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.05 1.09 0.96 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architectu
ral
Coatings

28.8 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Item #6. Page 445
Meeting Date: 9/24/2024 / Packet Page #: 581
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 39 / 79
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.66 3.66 < 0.005 < 0.005 — 3.67 Architectu
ral
Coatings

0.79 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.61 0.61 < 0.005 < 0.005 — 0.61 Architectu
ral
Coatings

0.14 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.43 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 85.6 85.6 < 0.005 < 0.005 0.31 86.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.26 2.26 < 0.005 < 0.005 < 0.005 2.29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.37 0.37 < 0.005 < 0.005 < 0.005 0.38 Item #6. Page 446
Meeting Date: 9/24/2024 / Packet Page #: 582
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 40 / 79
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 447
Meeting Date: 9/24/2024 / Packet Page #: 583
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 41 / 79
Total 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371

4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated
Item #6. Page 448
Meeting Date: 9/24/2024 / Packet Page #: 584
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 42 / 79
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 189 189 0.02 < 0.005 — 190
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 189 189 0.02 < 0.005 — 190
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 31.2 31.2 < 0.005 < 0.005 — 31.4
Parking
Lot
— — — — — — — — — — — 1.51 1.51 < 0.005 < 0.005 — 1.52
Total — — — — — — — — — — — 32.7 32.7 < 0.005 < 0.005 — 32.9

4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 449
Meeting Date: 9/24/2024 / Packet Page #: 585
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 43 / 79
Condo/To — — — — — — — — — — — 189 189 0.02 < 0.005 — 190 wnhouse
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 189 189 0.02 < 0.005 — 190
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 31.2 31.2 < 0.005 < 0.005 — 31.4
Parking
Lot
— — — — — — — — — — — 1.51 1.51 < 0.005 < 0.005 — 1.52
Total — — — — — — — — — — — 32.7 32.7 < 0.005 < 0.005 — 32.9

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Item #6. Page 450
Meeting Date: 9/24/2024 / Packet Page #: 586
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 44 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
< 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0

4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Item #6. Page 451
Meeting Date: 9/24/2024 / Packet Page #: 587
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 45 / 79
Parking 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Lot
Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
< 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0

4.3. Area Emissions by Source

4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.08 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt

0.22 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.52 6.52 < 0.005 < 0.005 — 6.55 Total 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 452
Meeting Date: 9/24/2024 / Packet Page #: 588
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 46 / 79
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.08 — — — — — — — — — — — — — — — —
Total 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.18 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.01 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt

0.03 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.74 0.74 < 0.005 < 0.005 — 0.74 Total 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74

4.3.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Item #6. Page 453
Meeting Date: 9/24/2024 / Packet Page #: 589
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 47 / 79
Architectu 0.08 — — — — — — — — — — — — — — — —
ral
Landscap
e
Equipme
nt

0.22 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.52 6.52 < 0.005 < 0.005 — 6.55 Total 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.08 — — — — — — — — — — — — — — — —
Total 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.18 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.01 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt

0.03 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.74 0.74 < 0.005 < 0.005 — 0.74 Total 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74

4.4. Water Emissions by Land Use
Item #6. Page 454
Meeting Date: 9/24/2024 / Packet Page #: 590
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 48 / 79

4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92

4.4.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item #6. Page 455
Meeting Date: 9/24/2024 / Packet Page #: 591
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 49 / 79
Daily, — — — — — — — — — — — — — — — — —
Summer
(Max)
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 456
Meeting Date: 9/24/2024 / Packet Page #: 592
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 50 / 79
Condo/To — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 wnhouse
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90

4.5.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Item #6. Page 457
Meeting Date: 9/24/2024 / Packet Page #: 593
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 51 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Condo/To
wnhouse
— — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Item #6. Page 458
Meeting Date: 9/24/2024 / Packet Page #: 594
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 52 / 79
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.05 0.05
Total — — — — — — — — — — — — — — — 0.05 0.05

4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.05 0.05
Total — — — — — — — — — — — — — — — 0.05 0.05

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Item #6. Page 459
Meeting Date: 9/24/2024 / Packet Page #: 595
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 53 / 79
Equipme ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e nt
Type
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type
Item #6. Page 460
Meeting Date: 9/24/2024 / Packet Page #: 596
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 54 / 79

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Item #6. Page 461
Meeting Date: 9/24/2024 / Packet Page #: 597
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 55 / 79

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Item #6. Page 462
Meeting Date: 9/24/2024 / Packet Page #: 598
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 56 / 79
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Item #6. Page 463
Meeting Date: 9/24/2024 / Packet Page #: 599
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 57 / 79
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Item #6. Page 464
Meeting Date: 9/24/2024 / Packet Page #: 600
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 58 / 79
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —

4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 465
Meeting Date: 9/24/2024 / Packet Page #: 601
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 59 / 79
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Item #6. Page 466
Meeting Date: 9/24/2024 / Packet Page #: 602
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 60 / 79
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 6/1/2024 6/29/2024 5.00 20.0 —
Site Preparation Site Preparation 6/30/2024 7/2/2024 5.00 2.00 — Grading Grading 7/3/2024 7/8/2024 5.00 4.00 —
Building Construction Building Construction 7/9/2024 4/15/2025 5.00 200 — Paving Paving 4/16/2025 4/30/2025 5.00 10.0 —
Architectural Coating Architectural Coating 4/2/2025 4/15/2025 5.00 10.0 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
Item #6. Page 467
Meeting Date: 9/24/2024 / Packet Page #: 603
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 61 / 79
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Backh
oes
Diesel Tier 3 3.00 8.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Tier 3 1.00 8.00 33.0 0.73
Site Preparation Graders Diesel Tier 3 1.00 8.00 148 0.41 Site Preparation Rubber Tired Dozers Diesel Tier 3 1.00 7.00 367 0.40 Site Preparation Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Grading Graders Diesel Tier 3 1.00 8.00 148 0.41
Grading Tractors/Loaders/Backh
oes
Diesel Tier 3 2.00 7.00 84.0 0.37
Grading Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Building Construction Cranes Diesel Tier 3 1.00 6.00 367 0.29 Building Construction Forklifts Diesel Tier 3 1.00 6.00 82.0 0.20 Building Construction Generator Sets Diesel Tier 3 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 6.00 84.0 0.37
Building Construction Welders Diesel Tier 3 3.00 8.00 46.0 0.45 Paving Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Paving Pavers Diesel Tier 3 1.00 6.00 81.0 0.42
Paving Paving Equipment Diesel Tier 3 1.00 8.00 89.0 0.36 Paving Rollers Diesel Tier 3 1.00 7.00 36.0 0.38
Paving Cement and Mortar
Mixers
Diesel Tier 3 1.00 6.00 10.0 0.56
Architectural Coating Air Compressors Diesel Tier 3 1.00 6.00 37.0 0.48

5.2.2. Mitigated
Item #6. Page 468
Meeting Date: 9/24/2024 / Packet Page #: 604
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 62 / 79
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Backh
oes
Diesel Tier 3 3.00 8.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Tier 3 1.00 8.00 33.0 0.73
Site Preparation Graders Diesel Tier 3 1.00 8.00 148 0.41 Site Preparation Rubber Tired Dozers Diesel Tier 3 1.00 7.00 367 0.40 Site Preparation Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Grading Graders Diesel Tier 3 1.00 8.00 148 0.41
Grading Tractors/Loaders/Backh
oes
Diesel Tier 3 2.00 7.00 84.0 0.37
Grading Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Building Construction Cranes Diesel Tier 3 1.00 6.00 367 0.29 Building Construction Forklifts Diesel Tier 3 1.00 6.00 82.0 0.20 Building Construction Generator Sets Diesel Tier 3 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 6.00 84.0 0.37
Building Construction Welders Diesel Tier 3 3.00 8.00 46.0 0.45 Paving Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Paving Pavers Diesel Tier 3 1.00 6.00 81.0 0.42
Paving Paving Equipment Diesel Tier 3 1.00 8.00 89.0 0.36 Paving Rollers Diesel Tier 3 1.00 7.00 36.0 0.38
Paving Cement and Mortar
Mixers
Diesel Tier 3 1.00 6.00 10.0 0.56
Architectural Coating Air Compressors Diesel Tier 3 1.00 6.00 37.0 0.48

5.3. Construction Vehicles
Item #6. Page 469
Meeting Date: 9/24/2024 / Packet Page #: 605
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 63 / 79

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 3.45 20.0 HHDT
Demolition Onsite truck — — HHDT
Site Preparation — — — —
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 31.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 4.60 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 12.5 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Item #6. Page 470
Meeting Date: 9/24/2024 / Packet Page #: 606
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 64 / 79
Architectural Coating — — — —
Architectural Coating Worker 6.19 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT

5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 3.45 20.0 HHDT
Demolition Onsite truck — — HHDT
Site Preparation — — — —
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 31.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 4.60 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Item #6. Page 471
Meeting Date: 9/24/2024 / Packet Page #: 607
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 65 / 79
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 12.5 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 6.19 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 92,300 30,767 0.00 0.00 653

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Building Square Footage)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 6,000 —
Site Preparation — — 1.88 0.00 —
Item #6. Page 472
Meeting Date: 9/24/2024 / Packet Page #: 608
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 66 / 79
Grading — — 4.00 0.00 —
Paving 0.00 0.00 0.00 0.00 1.00

5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
Water Demolished Area 2 36% 36%

5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Condo/Townhouse 0.75 100%
Parking Lot 0.25 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2024 0.00 532 0.03 < 0.005
2025 0.00 532 0.03 < 0.005

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Condo/Townhouse 315 350 270 114,394 2,846 3,165 2,442 1,034,489 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Item #6. Page 473
Meeting Date: 9/24/2024 / Packet Page #: 609
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 67 / 79

5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Condo/Townhouse 315 350 270 114,394 2,846 3,165 2,442 1,034,489 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Condo/Townhouse —
Wood Fireplaces 0
Gas Fireplaces 0
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 43
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0

5.10.1.2. Mitigated
Hearth Type Unmitigated (number)
Condo/Townhouse —
Wood Fireplaces 0
Gas Fireplaces 0
Item #6. Page 474
Meeting Date: 9/24/2024 / Packet Page #: 610
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 68 / 79
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 43
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
92299.5 30,767 0.00 0.00 653

5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Item #6. Page 475
Meeting Date: 9/24/2024 / Packet Page #: 611
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 69 / 79
Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Condo/Townhouse 197,463 349 0.0330 0.0040 1,033,305
Parking Lot 9,540 349 0.0330 0.0040 0.00

5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Condo/Townhouse 197,463 349 0.0330 0.0040 1,033,305
Parking Lot 9,540 349 0.0330 0.0040 0.00

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Condo/Townhouse 1,602,773 12.9
Parking Lot 0.00 0.00

5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Condo/Townhouse 1,602,773 12.9
Parking Lot 0.00 0.00

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Item #6. Page 476
Meeting Date: 9/24/2024 / Packet Page #: 612
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 70 / 79
Condo/Townhouse 31.7 —
Parking Lot 0.00 —

5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Condo/Townhouse 31.7 —
Parking Lot 0.00 —

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Condo/Townhouse Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Condo/Townhouse Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00

5.14.2. Mitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Condo/Townhouse Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Condo/Townhouse Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated
Item #6. Page 477
Meeting Date: 9/24/2024 / Packet Page #: 613
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 71 / 79
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor

5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr)

5.17. User Defined
Equipment Type Fuel Type

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres Item #6. Page 478
Meeting Date: 9/24/2024 / Packet Page #: 614
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 72 / 79

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 23.3 annual days of extreme heat Extreme Precipitation 8.80 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 26.6 annual hectares burned
Item #6. Page 479
Meeting Date: 9/24/2024 / Packet Page #: 615
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 73 / 79
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.

Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 3 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 3 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Item #6. Page 480
Meeting Date: 9/24/2024 / Packet Page #: 616
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 74 / 79
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 84.6
AQ-PM 81.8
AQ-DPM 44.1
Drinking Water 51.3
Lead Risk Housing 72.1
Pesticides 0.00
Toxic Releases 67.1
Traffic 94.0
Effect Indicators —
CleanUp Sites 0.00
Item #6. Page 481
Meeting Date: 9/24/2024 / Packet Page #: 617
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 75 / 79
Groundwater 0.00
Haz Waste Facilities/Generators 38.7
Impaired Water Bodies 0.00
Solid Waste 25.7
Sensitive Population —
Asthma 56.5
Cardio-vascular 66.0
Low Birth Weights 14.8
Socioeconomic Factor Indicators —
Education 43.4
Housing 60.9
Linguistic 56.9
Poverty 38.9
Unemployment 62.4

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 46.93956114
Employed 25.29192865
Median HI 45.13024509
Education —
Bachelor's or higher 51.32811497
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Item #6. Page 482
Meeting Date: 9/24/2024 / Packet Page #: 618
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 76 / 79
Auto Access 17.29757475
Active commuting 33.38893879
Social —
2-parent households 39.17618375
Voting 30.01411523
Neighborhood —
Alcohol availability 54.13832927
Park access 30.86102913
Retail density 68.58719364
Supermarket access 55.03657128
Tree canopy 26.03618632
Housing —
Homeownership 34.05620429
Housing habitability 48.76170923
Low-inc homeowner severe housing cost burden 66.95752598 Low-inc renter severe housing cost burden 27.07558065
Uncrowded housing 70.21686129
Health Outcomes —
Insured adults 66.66238932
Arthritis 0.0
Asthma ER Admissions 44.9
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Item #6. Page 483
Meeting Date: 9/24/2024 / Packet Page #: 619
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 77 / 79
Life Expectancy at Birth 27.2
Cognitively Disabled 38.1
Physically Disabled 23.7
Heart Attack ER Admissions 46.6
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 49.9
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 86.0
Elderly 32.8
English Speaking 66.0
Foreign-born 27.7
Outdoor Workers 74.9
Climate Change Adaptive Capacity —
Impervious Surface Cover 56.7
Traffic Density 91.1
Traffic Access 23.0
Other Indices —
Item #6. Page 484
Meeting Date: 9/24/2024 / Packet Page #: 620
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 78 / 79
Hardship 54.6
Other Decision Support —
2016 Voting 44.1

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 56.0 Healthy Places Index Score for Project Location (b) 46.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) Yes Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data
Screen Justification
Land Use PD
Construction: Construction Phases Dates were shifted to include Architectural Coatings during Building Construction Construction: Off-Road Equipment PDF Tier 3 Equipment or Better Construction: Paving Manual updated asphalt onsite
Item #6. Page 485
Meeting Date: 9/24/2024 / Packet Page #: 621
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 79 / 79
Operations: Hearths no hearth options are installed
Item #6. Page 486
Meeting Date: 9/24/2024 / Packet Page #: 622
Initial Study/Mitigated Negative Declaration July 2024
Brandywine Route 66 Residential – PLN 23-0027

Page 162 ends

Appendix E
Preliminary Geotechnical Investigation, AIN: 8646-029-009 and -014, 723-731 East Route 66, City of Glendora, County of Los Angeles, California
Alta California Geotechnical, Inc.

June 22, 2023
Item #6. Page 487
Meeting Date: 9/24/2024 / Packet Page #: 623
Corona Office
Phone: 951.509.7090
BRANDYWINE HOMESS            June 22, 2023
16580 Aston Street               Project No. 1‐0486
Irvine, CA 92606
Attention: Mr. Stephen Edwards
Subject: PRELIMINARY GEOTECHNICAL INVESTIGATION
APN: 8646‐029‐009 and ‐014
723‐731 East Route 66, City of Glendora
County of Los Angeles, California
References: See Appendix A
Dear Mr. Edwards:

Alta California Geotechnical, Inc. (Alta) is pleased to present this Preliminary Geotechnical Investigation for APN: 8646‐029‐009 and ‐014, located at 723‐731 East Route 66 in the City of Glendora, Los Angeles County, California. This report is based on Alta’s recent subsurface investigation, laboratory testing, engineering analyses, and a review of the referenced reports.

Alta’s review of the geotechnical data indicates that the proposed development is feasible, from a geotechnical perspective, provided that the recommendations presented in this report are incorporated into the grading and improvement plans and implemented during site development.

Included in this report are:
 Discussion of the site geotechnical conditions.
 Recommendations for remedial and site grading, including unsuitable soil removals.  Geotechnical site construction recommendations.
 Preliminary foundation design parameters.

Item #6. Page 488
Meeting Date: 9/24/2024 / Packet Page #: 624
Project Number 1‐0486   Page ii
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

If you have any questions or should you require any additional information, please contact the undersigned at (951) 509‐7090. Alta appreciates the opportunity to provide geotechnical consulting services for your project.

Sincerely,
Alta California Geotechnical, Inc. Reviewed By:
___________________________________
LOGAN A. MARQUETTE
Civil Engineering Associate
Project Manager
___________________________________
SCOTT A. GRAY/RGE 2857
Reg. Exp.: 12‐31‐24
Registered Geotechnical Engineer
President
________________________________
THOMAS J. MCCARTHY/CEG 2080
Reg. Exp.: 9‐30‐24
Certified Engineering Geologist
Vice President
Distribution: (1) Addressee
JBC:SAG  1‐0486, June 22, 2023 (Preliminary Geotechnical Investigation, Glendora)

Item #6. Page 489
Meeting Date: 9/24/2024 / Packet Page #: 625
Project Number 1‐0486   Page iii
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

TABLE OF CONTENTS

1.0 INTRODUCTION................................................................................................................. 1

1.1 Purpose ................................................................................................................. 1

1.2 Scope of Work ....................................................................................................... 1

1.3 Report Limitations................................................................................................. 2

2.0 PROJECT DESCRIPTION...................................................................................................... 2

2.1 Site Location and Existing Conditions.................................................................... 2

2.2 Proposed Development......................................................................................... 2

3.0 SITE INVESTIGATION.......................................................................................................... 3

3.1 Subsurface Investigation and Laboratory Testing.................................................. 3

3.2 Infiltration Testing ................................................................................................. 3

4.0 GEOLOGIC CONDITIONS .................................................................................................... 4

4.1 Geologic and Geomorphic Setting ......................................................................... 4

4.2 Stratigraphy........................................................................................................... 4

4.2.1 Undocumented Artificial Fill (Map symbol afu) ......................................... 4

4.2.2 Young Alluvial Fan Deposits (Map symbol Qyf).......................................... 5

4.3 Geologic Structure................................................................................................. 5

4.3.1 Tectonic Framework .................................................................................. 5

4.3.2 Regionally Mapped Active Faults............................................................... 6

4.3.3 Geologic Structure ..................................................................................... 6

4.4 Groundwater......................................................................................................... 6

4.5 Earthquake Hazards............................................................................................... 6

4.5.1 Local and Regional Faulting ....................................................................... 6

4.5.2 Seismicity................................................................................................... 7

4.5.3 Surface Rupture......................................................................................... 7

4.5.4 Liquefaction............................................................................................... 7

4.5.5 Dry Sand Settlement.................................................................................. 8

5.0 ENGINEERING PROPERTIES AND ANALYSIS ....................................................................... 8

5.1 Materials Properties.............................................................................................. 8

5.1.1 Excavation Characteristics......................................................................... 8

5.1.2 Compressibility .......................................................................................... 9

5.1.3 Moisture .................................................................................................... 9

5.1.4 Hydro‐Consolidation.................................................................................. 9

5.1.5 Expansion Potential ................................................................................. 10

5.1.6 Earthwork Adjustments........................................................................... 10

5.1.7 Chemical Analyses ................................................................................... 10

5.2 Engineering Analysis............................................................................................ 11

5.2.1 Bearing Capacity and Lateral Earth Pressures.......................................... 11 Item #6. Page 490
Meeting Date: 9/24/2024 / Packet Page #: 626
Project Number 1‐0486   Page iv
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.0 CONCLUSIONS AND RECOMMENDATIONS...................................................................... 11

6.1 General Earthwork Recommendations................................................................ 11

6.1.1 Site Preparation....................................................................................... 11

6.1.2 Unsuitable Soil Removals......................................................................... 12

6.1.3 Over‐excavation of Building Pads ............................................................ 13

6.2 General Earthwork Recommendations................................................................ 14

6.2.1 Compaction Standards............................................................................. 14

6.2.2 Groundwater/Seepage ............................................................................ 14

6.2.3 Documentation of Removals ................................................................... 14

6.2.4 Treatment of Removal Bottoms .............................................................. 14

6.2.5 Fill Placement .......................................................................................... 15

6.2.6 Moisture Content .................................................................................... 15

6.2.7 Mixing...................................................................................................... 15

6.2.8 Import Soils.............................................................................................. 15

6.2.9 Utility Trenches........................................................................................ 16

6.2.9.1 Excavation.......................................................................................................... 16

6.2.9.2 Backfill ............................................................................................................... 16

6.2.10 Backcut Stability ...................................................................................... 17

6.3 Storm Water Infiltration Systems........................................................................ 17

6.4 Boundary Conditions........................................................................................... 18

7.0 DESIGN CONSIDERATIONS............................................................................................... 18

7.1 Structural Design ................................................................................................. 18

7.1.1 Foundations............................................................................................. 19

7.1.2 Conventional Slab/Foundation Systems .................................................. 19

7.1.3 Post‐Tensioned Slabs/Foundation Design Recommendations................. 20

7.2 Moisture Barrier.................................................................................................. 21

7.3 Seismic Design..................................................................................................... 22

7.4 Block Walls .......................................................................................................... 23

7.5 Footing Excavations............................................................................................. 23

7.6 Retaining Walls.................................................................................................... 23

7.7 Exterior Slabs and Walkways............................................................................... 25

7.7.1 Subgrade Compaction.............................................................................. 25

7.7.2 Subgrade Moisture .................................................................................. 25

7.7.3 Concrete Slab Thickness .......................................................................... 25

7.7.4 Concrete Slab Reinforcement.................................................................. 25

7.7.5 Control Joints........................................................................................... 25

7.8 Concrete Design .................................................................................................. 26

7.9 Corrosion............................................................................................................. 26

7.10 Site Drainage ....................................................................................................... 26 Item #6. Page 491
Meeting Date: 9/24/2024 / Packet Page #: 627
Project Number 1‐0486   Page v
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.11 Pavement Design................................................................................................. 27

8.0 LOT MAINTENANCE......................................................................................................... 28

8.1 Lot Drainage ........................................................................................................ 28

8.2 Burrowing Animals.............................................................................................. 28

9.0 FUTURE PLAN REVIEWS................................................................................................... 28

10.0 CLOSURE.......................................................................................................................... 29

10.1 Geotechnical Review ........................................................................................... 29

10.2 Limitations........................................................................................................... 29 APPENDIX A: REFERENCES
APPENDIX B: SUBSURFACE INVESTIGATION
APPENDIX C:   LABORATORY TESTING
APPENDIX D: MAINTENANCE CONSIDERATIONS
APPENDIX E: EARTHWORK SPECIFICATIONS
APPENDIX F: GRADING DETAILS
Item #6. Page 492
Meeting Date: 9/24/2024 / Packet Page #: 628
Project Number 1‐0486   Page 1
June 23, 2023
Corona Office
Phone: 951.509.7090

1.0 INTRODUCTION
This report presents Alta’s findings, conclusions, and geotechnical recommendations for the proposed residential development of APN: 8646‐029‐009 and ‐014 located at 723‐ 731 East Route 66, in the City of Glendora, Los Angeles County, California.

1.1 Purpose
The purpose of this report is to examine the existing onsite geotechnical conditions and assess their impact on the proposed development. The property is depicted on the enclosed Plate 1. This report is suitable for use in developing grading plans and preliminary construction cost estimates.

1.2 Scope of Work
Alta’s Scope of Work for this geotechnical investigation included the following:
 Reviewing the referenced reports and air photos (Appendix A).  Site geologic mapping.
 Excavating, logging, and sampling four (4) hollow‐stem auger borings to a maximum depth of 26‐feet below the existing ground surface (Appendix B).
 Conducting laboratory testing on samples obtained during our investigation (Appendix C).
 Performing an infiltration study and providing a preliminary assessment of the infiltration characteristics of the onsite soils and their impact on storm water disposal.
 Evaluating engineering geologic and geotechnical engineering data, including laboratory data, to develop recommendations for site remedial grading including specialized grading techniques for unsuitable soil removals along the property boundary, import soil, foundations, and utilities.
 Preparing this report and accompanying exhibits.

Item #6. Page 493
Meeting Date: 9/24/2024 / Packet Page #: 629
Project Number 1‐0486   Page 2
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

1.3 Report Limitations
The conclusions and recommendations presented in this report are based on the field and laboratory information generated during this investigation, and a review of the referenced reports. The information contained in this report is intended to be used for development of grading plans and preliminary construction cost estimates.

2.0 PROJECT DESCRIPTION

2.1 Site Location and Existing Conditions
The rectangular shaped approximately ±1.8‐acre, site is relatively flat and consists of a paved parking lot, a dirt field, and a single commercial structure with associated concrete flatwork. The dirt field has remnants of previously placed asphaltic concrete, however, much has been eroded away. The site is bounded to the north by a railroad easement, to the east and west by commercial properties, and to the south by Route 66.

Historic aerial images are available as far back as 1948 and indicate that the site was originally utilized for agricultural purposes. By 1964, the site was cleared and three structures were constructed, one in the southwest corner of the property and two in the southeast corner of the property. The southwestern structure was expanded to its current configuration and the two southeastern structures were demolished by 1974. The dirt field was paved with asphaltic concrete by 1980 and the site has remained largely unchanged since. (Historic Aerials, 2023).

2.2 Proposed Development
It is our understanding that the site is to be developed to support multifamily residential structures and associated improvements. It is Alta’s understanding that conventional cut‐and‐fill grading techniques will be used to develop the site for the support of wood‐frame and stucco construction with shallow foundations and reinforced concrete slabs‐on‐grade, and associated improvements.

Item #6. Page 494
Meeting Date: 9/24/2024 / Packet Page #: 630
Project Number 1‐0486   Page 3
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

3.0 SITE INVESTIGATION

3.1 Subsurface Investigation and Laboratory Testing
Alta conducted a subsurface investigation on May 24th, 2023, consisting of the excavation, logging, and select sampling of four (4) hollow‐stem auger borings to a maximum depth of 26‐feet below the existing ground surface. The locations of the borings are shown on Plate 1 and the boring logs are presented in Appendix B.

Laboratory testing was performed on bulk and ring samples obtained during the field investigation. A brief description of the laboratory test procedures and the test results are presented in Appendix C.

3.2 Infiltration Testing
It is Alta’s understanding that the site may utilize infiltration systems for storm water disposal. Details of the systems are not known at this time.

Infiltration testing was undertaken using two ten (10) foot‐deep borings (P‐1 and P‐2) as shown on Plate 1. The testing was performed on May 25, 2023 in general conformance with the County of Los Angeles Technical Guidance Document Standards. The test wells were presoaked for 24 hours, and then water level readings were recorded every 10 minutes until the readings stabilized.

The data was then adjusted to provide an infiltration rate utilizing the Porchet Method. The resulting infiltration rate is presented in Table 3‐1. The results do not include a Factor of Safety. Recommendations for infiltration BMP design are presented in Section 6.3.

Item #6. Page 495
Meeting Date: 9/24/2024 / Packet Page #: 631
Project Number 1‐0486   Page 4
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

Table 3‐1‐Summary of Infiltration Testing
(No Factor of Safety)
Test Designation P‐1 P‐2
Approximate Depth of Test 10 ft 10 ft
Time Interval 10 minutes 10 minutes
Radius of Test Hole 4 inches 4 inches
Tested Infiltration Rate 13.4 (in/hr) 10.8 (in/hr)

4.0 GEOLOGIC CONDITIONS

4.1 Geologic and Geomorphic Setting
Regionally, the subject site is located in the Peninsular Ranges geomorphic province, which characterizes the southwest portion of southern California where major right lateral active fault zones predominately trend northwest‐southeast.

The Peninsular Ranges province is composed of plutonic and metamorphic rock, with lesser amounts of Tertiary volcanic and sedimentary rock, Quaternary drainage in‐fills and sedimentary veneers.

4.2 Stratigraphy
Based on our literature review and subsurface investigation the site is underlain by undocumented artificial fill and young alluvial fan deposits. These geologic units are briefly described below.

4.2.1 Undocumented Artificial Fill (Map symbol afu)
The undocumented artificial fill encountered at the site consists primarily of tannish brown and brown silty sand and gravelly sand in a slightly moist and medium dense condition. The unit was logged to depths ranging from two and a half (2.5) to five (5) feet below the ground surface.

Item #6. Page 496
Meeting Date: 9/24/2024 / Packet Page #: 632
Project Number 1‐0486   Page 5
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

4.2.2 Young Alluvial Fan Deposits (Map symbol Qyf)
The artificial fill is underlain by young alluvial fan deposits consisting of brown and dark brown to reddish brown and orange brown gravelly sand and silty sand/clayey sand in a dry to slightly moist, medium dense to very dense condition. Gravel/cobble lenses are common.  The unit was logged to a depth of 26.0 feet below the ground surface.

4.3 Geologic Structure

4.3.1 Tectonic Framework
Jennings (1985) defined eight structural provinces within California that have been classified by predominant regional fault trends and similar fold structure. These provinces are in turn divided into blocks and sub‐blocks that are defined by “major Quaternary faults.”  These blocks and sub‐ blocks exhibit similar structural features. Within this framework, the site is located within Structural Province I, which is controlled by the dominant northwest trend of the San Andreas Fault and is divided into two blocks, the Coast Range Block, and the Peninsular Range Block. The Peninsular Range Block, on which this site is located, is characterized by a series of parallel, northwest trending faults that exhibit right lateral dip‐ slip movement. These faults are terminated by the Transverse Range block to the north and extend southward to the Baja Peninsula. These northwest trending faults divide the Peninsular Range block into eight sub‐blocks. The site is located on the extreme northern portion of the Riverside Sub‐block, one of the eight sub‐blocks, which is bound on the west by the Elsinore fault zone and on the east by the San Jacinto fault zone.

Item #6. Page 497
Meeting Date: 9/24/2024 / Packet Page #: 633
Project Number 1‐0486   Page 6
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

4.3.2 Regionally Mapped Active Faults
Several large, active fault systems including the Sierra Madre, Elsinore‐ Whittier, San Jacinto, and the San Andreas occur in the region surrounding the site. These fault systems have been studied extensively and in a large part control the geologic structure of southern California.

4.3.3 Geologic Structure
Based upon our site investigation and literature review, the onsite alluvial sediments are of Holocene age, and are not folded or faulted.

4.4 Groundwater
Our subsurface investigation did not encounter groundwater to the depth of twenty (26) feet below the ground surface. The historic high groundwater depth approximately 100‐feet below the ground surface (CDMG, 1998).

4.5 Earthquake Hazards
The subject site is located in southern California, which is a tectonically active area. The type and magnitude of seismic hazards affecting a site are dependent on the distance to the causative fault and the intensity and magnitude of the seismic event. The seismic hazard may be primary, such as surface rupture and/or ground shaking, or secondary, such as liquefaction and/or ground lurching.

4.5.1 Local and Regional Faulting
The nearest known active faults (movement occurring ≤ 11,700 years ago) are the: Sierra Madre fault, San Jose fault, Clamshell‐Sawpit fault, Cucamonga fault, Raymond fault, Chino fault, and Elsinore fault located

1.4, 4.8, 6.6, 7.1, 8.2, 9.1, and 13.0 miles from the site (USGS, 2008).

Item #6. Page 498
Meeting Date: 9/24/2024 / Packet Page #: 634
Project Number 1‐0486   Page 7
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

4.5.2 Seismicity
Ground shaking hazards caused by earthquakes along other active regional faults exist. The 2022 California Building Code requires use‐ modified spectral accelerations and velocities for most structural designs.

Seismic design parameters using soil profile types identified in the 2022 California Building Code are presented in Section 7.3.

4.5.3 Surface Rupture
Active faults are not known to exist within the project and a review of Special Publication 42 indicates the site is not within a California State designated earthquake Fault Rupture Hazard Zone (CGS, 2018).

Accordingly, the potential for fault surface rupture on the subject site is very low.

4.5.4 Liquefaction
Seismic agitation of relatively loose saturated sands, silty sands, and some silts can result in a buildup of pore pressure. If the pore pressure exceeds the overburden stresses, a temporary quick condition known as liquefaction can occur. Liquefaction effects can manifest in several ways including:  1) loss of bearing; 2) lateral spread; 3) dynamic settlement; and 4) flow failure. Lateral spreading has typically been the most damaging mode of failure.

In general, the more recent that a sediment has been deposited, the more likely it will be susceptible to liquefaction. Other factors that must be considered are:  groundwater, confining stresses, relative density, and the intensity and duration of seismically‐induced ground shaking.

The site is not within a State‐identified zone of required investigation for liquefaction (CGS, 1999). Groundwater was not encountered during the Item #6. Page 499
Meeting Date: 9/24/2024 / Packet Page #: 635
Project Number 1‐0486   Page 8
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
subsurface investigation which extended to a depth of 26 feet. The nearest groundwater well indicates that groundwater is 519‐ft. below the ground surface.

Based on the depth of groundwater, it is our opinion that the potential for liquefaction is minimal at the site.

4.5.5 Dry Sand Settlement
Dry sand settlement is the process of non‐uniform settlement of the ground surface during a seismic event. Based on our subsurface investigation and our removal/recompaction recommendations, the potential for dry sand settlement is anticipated to be low and within foundation design tolerances.

5.0 ENGINEERING PROPERTIES AND ANALYSIS

5.1 Materials Properties
Presented herein is a general discussion of the engineering properties of the onsite materials that will be encountered during construction of the proposed project. Descriptions of the soil (Unified Soil Classification System) are presented on the boring logs in Appendix B.

5.1.1 Excavation Characteristics
Based on the data provided from the subsurface investigation, it is our opinion that the onsite materials possess favorable excavation characteristics such that conventional earth moving equipment can be utilized. Gravel and cobbles will be encountered during the excavations in the young alluvial fan deposits.

Item #6. Page 500
Meeting Date: 9/24/2024 / Packet Page #: 636
Project Number 1‐0486   Page 9
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

5.1.2 Compressibility
The undocumented artificial fill and upper portions of young alluvial fan deposits onsite are considered compressible and unsuitable to support the proposed improvements. Recommended removal depths are presented in Section 6.1.2.

5.1.3 Moisture
The moisture content of the undocumented artificial fill and young alluvial fan deposits that will require removal and recompaction as discussed in Section 6.1.2 are typically under‐optimum and will require moisture conditioning for compaction.

5.1.4 Hydro‐Consolidation
Hydro‐consolidation is the effect of introducing water into soil that is prone to collapse. Upon loading and initial wetting, the soil structure and apparent strength are altered resulting in almost immediate settlement.

That settlement can have adverse impacts on engineered structures, particularly in areas where it is manifested differentially. Differential settlements are typically associated with differential wetting, irregularities in the subsurface soil conditions, or irregular loading patterns.

Based on soil type and gravel content of the soils encountered, the potential for hydro‐collapse in the underlying young alluvial fan deposits is minimal and should be within foundation tolerances upon the completion of the recommended unsuitable soil removals.

Item #6. Page 501
Meeting Date: 9/24/2024 / Packet Page #: 637
Project Number 1‐0486   Page 10
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

5.1.5 Expansion Potential
Expansion index testing was performed on samples taken during our subsurface investigation. Based on the results, it is anticipated that the majority of materials onsite are “very low” to “low” in expansion potential (0≤EI≤50, Appendix C) when tested per ASTM D: 4829.

5.1.6 Earthwork Adjustments
The values presented in Table 5‐1 are deemed appropriate for estimating purposes and may be used in an effort to balance earthwork quantities.

As is the case with every project, contingencies should be made to adjust the earthwork balance when grading is in‐progress and actual conditions are better defined.

TABLE 5‐1
Earthwork Adjustment Factors
Geologic Unit Adjustment Factor Range Average
Undocumented Artificial Fill/
Young Alluvial Fan Deposits Shrink 6% to 10% 8%

5.1.7 Chemical Analyses
Chemical testing was performed on samples of material underlying the proposed site. Soluble sulfate test results indicate that the soluble sulfate concentrations of the soils tested are classified as negligible (Class S0) per ACI 318‐14.

Negligible chloride levels were detected in the onsite soils. Resistivity testing conducted as part of this investigation, indicates that the soils are “slightly corrosive” to buried metals (per Romanoff, 1989). Additional discussions on corrosion are presented in Section 7.10.  Corrosion tests results are presented in Appendix C.

Item #6. Page 502
Meeting Date: 9/24/2024 / Packet Page #: 638
Project Number 1‐0486   Page 11
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

5.2 Engineering Analysis
Presented below is a general discussion of the engineering analysis methods that were utilized to develop the conclusions and recommendations presented in this report.

5.2.1 Bearing Capacity and Lateral Earth Pressures
Ultimate bearing capacity values were obtained using the graphs and formula presented in NAVFAC DM‐7.1. Allowable bearing was determined by applying a factor of safety of at least 3 to the ultimate bearing capacity. Static lateral earth pressures were calculated using Rankine methods for active and passive cases. If it is desired to use Coulomb forces, a separate analysis specific to the application can be conducted.

6.0 CONCLUSIONS AND RECOMMENDATIONS
Based on Alta’s findings during our subsurface investigation, the laboratory test results, and our staff’s previous experience in the area, it is Alta’s opinion that the development of the site is feasible from a geotechnical perspective. Presented below are Alta’s recommendations that should be incorporated into site development and construction plans.

6.1 General Earthwork Recommendations
All grading shall be accomplished under the observation and testing of the project geotechnical consultant in accordance with the recommendations contained herein and the City of Glendora criteria.

6.1.1 Site Preparation
Vegetation, construction debris, and other deleterious materials are unsuitable as structural fill material and should be disposed of offsite prior to commencing grading/construction. Any septic tanks, seepage pits Item #6. Page 503
Meeting Date: 9/24/2024 / Packet Page #: 639
Project Number 1‐0486   Page 12
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
or wells should be abandoned as per the County of Los Angeles Department of Health Services.

Existing concrete should be removed prior to the placement of engineered fill. The demolished concrete may be incorporated into compacted, engineered fills after it is crushed to a maximum size of six (6) inches. Prior to placement as engineered fill any protruding steel rebar should be cut from the concrete pieces and disposed of offsite.

Existing asphaltic concrete should be removed prior to the placement of engineered fill. From a geotechnical perspective, this material may be incorporated into compacted, engineered fills after it is crushed to a maximum size of six (6) inches. The crushed asphalt should not be placed under residential structures, but rather, it can be placed in approved non‐ residential areas, such as streets, parking areas or open space. These recommendations should be verified by the environmental consultant.

6.1.2 Unsuitable Soil Removals
The artificial fill and the upper portions of the young alluvial fan deposits near the surface are compressible and as such, are not suitable to support the proposed structures. Accordingly, it is recommended to completely remove the undocumented artificial fills and highly weathered portions of the underlying young alluvial fan deposits across the site and as close to the property boundaries as possible.

As such, it is anticipated that, on average, the upper three (3) to five (5) feet of existing soils will require removal and recompaction, extending at a minimum 1:1 projection horizontally outside the structures. This recommended removal combined with the foundation recommendations Item #6. Page 504
Meeting Date: 9/24/2024 / Packet Page #: 640
Project Number 1‐0486   Page 13
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
presented in Section 7.1 should provide suitable support for the proposed structures.

The Project Geotechnical Consultant should observe the removal bottom prior to placing fill. If unsuitable soils such as undocumented artificial fill are exposed upon the completion of the removals recommended above, additional removals will be required.

For streets, in general, a minimum removal and recompaction of the upper two (2) feet of soil is recommended, although deeper removals may be required if undocumented fill is exposed at that depth. Removal bottoms in parking lot areas should be tested to determine that the exposed soils have a minimum relative compaction of 85% of the laboratory maximum density (per ASTM test method D‐1557).

Material removed as part of the unsuitable soil removals can be used as artificial fill, provided it is free of deleterious materials.

6.1.3 Over‐excavation of Building Pads
Footings for structures should be underlain by a minimum of two (2) feet of compacted fill. As such, for building pads where unsuitable soil removals do not provide the minimum depth of compacted fill, or where design grades and/or remedial grading activities create cut/fill transitions, the cut and shallow fill portions of the building pads should be over‐excavated to provide the required depth of fill below the footings.

Item #6. Page 505
Meeting Date: 9/24/2024 / Packet Page #: 641
Project Number 1‐0486   Page 14
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.2 General Earthwork Recommendations

6.2.1 Compaction Standards
All fill and processed natural ground shall be compacted to a minimum relative compaction of 90 percent, as determined by ASTM Test Method:

D‐1557. Fill material should be moisture conditioned to optimum moisture or above, and as generally discussed in Alta’s Earthwork Specification Section presented in Appendix E. Compaction shall be achieved with the use of sheepsfoot rollers or similar kneading type equipment.

6.2.2 Groundwater/Seepage
It is anticipated that groundwater will not be encountered during construction. It is possible that perched water conditions could be encountered depending on the time of year construction occurs.

6.2.3 Documentation of Removals
All removal/over‐excavation bottoms should be observed and approved by the project Geotechnical Consultant prior to fill placement.

Consideration should be given to surveying the removal bottoms and undercuts after approval by the geotechnical consultant and prior to the placement of fill. Staking should be provided in order to verify undercut locations and depths.

6.2.4 Treatment of Removal Bottoms
At the completion of removals/over‐excavation, the exposed removal bottom should be ripped to a minimum depth of eight (8) inches, moisture‐conditioned to above optimum moisture content and compacted in‐place to the project standards.

Item #6. Page 506
Meeting Date: 9/24/2024 / Packet Page #: 642
Project Number 1‐0486   Page 15
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.2.5 Fill Placement
After removals, scarification, and compaction of in‐place materials are completed, additional fill may be placed. Fill should be placed in eight‐ inch bulk maximum lifts, moisture conditioned to optimum moisture content or above, compacted and tested as grading/construction progresses until final grades are attained.

6.2.6 Moisture Content
The moisture content of the upper in‐situ soils is primarily below optimum, as shown on the boring logs in Appendix B. These soils will require moisture conditioning prior to placement as engineered fill.

6.2.7 Mixing
Mixing of materials may be necessary to prevent layering of different soil types and/or different moisture contents. Mixing should be accomplished prior to and as part of the compaction of each fill lift.

6.2.8 Import Soils
Import soils, if necessary, should consist of clean, low expansive, structural quality, compactable materials similar to the on‐site soils and should be free of trash, debris, or other objectionable materials. The project Geotechnical Consultant should be notified not less than 72 hours in advance of the locations of any soils proposed for import. Import sources should be sampled, tested, and approved by the project Geotechnical Consultant at the source prior to the importation of the soils to the site.  The project Civil Engineer should include these requirements on plans and specifications for the project.

Item #6. Page 507
Meeting Date: 9/24/2024 / Packet Page #: 643
Project Number 1‐0486   Page 16
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.2.9 Utility Trenches

6.2.9.1 Excavation
Utility trenches should be supported, either by laying back excavations or shoring, in accordance with applicable OSHA standards. In general, existing site soils are classified as Soil Types "B" and “C” per OSHA standards. Upon completion of the recommended removals and re‐compaction, the artificial fill will be classified as Soil Type "B". The Project Geotechnical Consulting should be consulted if geologic conditions vary from what is presented in this report.

6.2.9.2 Backfill
Trench backfill should be compacted to at least 90 percent of maximum dry density as determined by ASTM D‐1557. Onsite soils will not be suitable for use as bedding material but will be suitable for use in backfill provided oversized materials are removed. No surcharge loads should be imposed above
excavations. This includes spoil piles, lumber, concrete trucks, or other construction materials and equipment. Drainage above excavations should be directed away from the banks.

Care should be taken to avoid saturation of the soils.

Compaction should be accomplished by mechanical means.

Jetting of native soils will not be acceptable.

Under‐slab trenches should also be compacted to project specifications. If select granular backfill (SE > 30) is used, compaction by flooding will be acceptable.

Item #6. Page 508
Meeting Date: 9/24/2024 / Packet Page #: 644
Project Number 1‐0486   Page 17
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.2.10 Backcut Stability
Temporary backcuts, if required during unsuitable soil removals, should be made no steeper than 1:1 without review and approval of the geotechnical consultant. Flatter backcuts may be necessary where geologic conditions dictate and where minimum width dimensions are to be maintained.

Care should be taken during remedial grading operations in order to minimize the risk of failure. Should failure occur, complete removal of the disturbed material will be required.

In consideration of the inherent instability created by temporary construction backcuts for removals, it is imperative that grading schedules are coordinated to minimize the unsupported exposure time of these excavations. Once started, these excavations and subsequent fill operations should be maintained to completion without intervening delays imposed by avoidable circumstances. In cases where five‐day workweeks comprise a normal schedule, grading should be planned to avoid exposing at‐grade or near‐grade excavations through a non‐work weekend. Where improvements may be affected by temporary instability, either on or offsite, further restrictions such as slot cutting, extending workdays, implementing weekend schedules, and/or other requirements considered critical to serving specific circumstances may be imposed.

6.3 Storm Water Infiltration Systems
From a geotechnical perspective, allowing storm water to infiltrate the onsite soil in concentrated areas increases the potential for settlement, liquefaction, and water‐related damage to structures/improvements, such as wet slabs or pumping subgrade, and should be avoided where possible. If infiltration systems are Item #6. Page 509
Meeting Date: 9/24/2024 / Packet Page #: 645
Project Number 1‐0486   Page 18
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
required on this site, care should be taken in designing systems that control the storm water as much as possible.

Preliminary infiltration testing was conducted at the site as part of this investigation, and the methodology is discussed in 3.2.  The resulting infiltration rates for P‐1 and P‐2 was calculated to be 13.4 and 10.8‐inches per hour, respectively. The results do not include a factor of safety.

Groundwater was not encountered during our investigation to a maximum depth of 26.0 feet below the ground surface. The historic high groundwater depth approximately 100‐feet below the ground surface (CDMG, 1998).

The Project Geotechnical Consultant should review the final WQMP design prior to construction.

6.4 Boundary Conditions
The site is bounded to the north by a railroad easement, to the east and west by commercial properties, and to the south by Route 66. Construction of retaining/screen walls along these boundaries will require additional geotechnical recommendations concerning unsuitable soil removals and foundation design parameters. Boundary conditions for the project should be reviewed by the Project Geotechnical Consultant as the design progresses.

7.0 DESIGN CONSIDERATIONS

7.1 Structural Design
It is anticipated that multi‐story, wood‐frame residential structures with slab on‐ grade and shallow foundations will be constructed. Upon the completion of rough grading, finish grade samples should be collected and tested in order to provide specific recommendations as they relate to the individual building pads.  These test results and corresponding design recommendations should be presented in a final rough grading report. Final slab and foundation design recommendations Item #6. Page 510
Meeting Date: 9/24/2024 / Packet Page #: 646
Project Number 1‐0486   Page 19
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
should be made based upon specific structure sitings, loading conditions, and as‐ graded soil conditions.

It is anticipated that the majority of onsite soils will possess “very low” to “low” expansion potential when tested in general accordance with ASTM Test Method D: 4829.  For budgeting purposes, the following foundation design requirements for a range of potential expansion characteristics are presented.

7.1.1 Foundations
Foundations may be preliminary designed based on the values presented in Table 7‐1 below.

Table 7‐1
Foundation Design Parameters*
Allowable Bearing 2000 lbs/ft2 assuming a minimum footing width and embedment of 12 inches.

Lateral Bearing 250 lbs/ft2 at a depth of 12 inches plus 250 lbs/ft2 for each additional 12 inches of embedment to a maximum of 2000
lbs/ft2
Sliding Coefficient 0.35
Differential Settlement Dynamic:

Differential = 0.5‐inches in 40 feet
Static:

Differential = 0.5‐inch in 40 feet
*These values may be increased as allowed by Code to resist transient loads such as wind or seismic. Building code and structural design considerations may govern depth and reinforcement requirements and should be evaluated.

7.1.2 Conventional Slab/Foundation Systems
Based on the onsite soils conditions and information supplied by the 2022 CBC, conventional slab/foundation systems may be designed in accordance with Tables 7‐1 and 7‐2.

Item #6. Page 511
Meeting Date: 9/24/2024 / Packet Page #: 647
Project Number 1‐0486   Page 20
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

TABLE 7‐2

CONVENTIONAL FOUNDATION DESIGN PARAMETERS
Expansion Potential Very Low to Low
Soil Category I
Design Plasticity Index 10
Minimum Footing
Embedment
12 inches*
*The minimum footing embedments presented herein are based on expansion indexes. The structural engineer should determine minimum embedments based on the number of floors supported by the footings, the structural loading, and the requirements of the latest California Building Code.

Minimum Footing Width 12‐inches‐The structural engineer should determine the minimum footing width based on loading and the latest California Building Code.

Footing Reinforcement No. 4 rebar, one (1) on top, one (1) on bottom Slab Thickness 4 inches (actual)
Slab Reinforcement* No. 3 rebar spaced 18 inches on center, each way Under‐Slab Requirement See Section 7.2
Slab Subgrade Moisture Minimum of 110 percent of optimum moisture to a depth of 12 inches prior to placing concrete.

Footing Embedment
Adjacent to Swales and
Slopes
If exterior footings adjacent to drainage swales are to exist within five (5) feet horizontally of the swale, the footing should be embedded sufficiently to assure embedment below the swale bottom is maintained. Footings adjacent to slopes should be embedded such that at least five‐ (5) feet is provided horizontally from edge of the footing to the face of the slope.

7.1.3 Post‐Tensioned Slabs/Foundation Design Recommendations Post‐tensioned slabs for the project may be preliminarily designed utilizing the parameters presented in Tables 7‐1 and 7‐3. The parameters presented herein are based on methodology provided in the Design of Post‐Tensioned Slabs‐On‐Ground, Third Edition, by the Post‐Tensioning Institute, in accordance with the 2022 CBC.

Item #6. Page 512
Meeting Date: 9/24/2024 / Packet Page #: 648
Project Number 1‐0486   Page 21
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

TABLE 7‐3
POST‐TENSION SLAB DESIGN PARAMETERS
Category Expansion Potential Minimum
Embedment
Edge Lift Center Lift
Em (ft) Ym
(inch) Em (ft) Ym (inch)
I Very Low to Low 12 inches* 5.4 0.61 9.0 0.26
Slab Subgrade Moisture
Category I Minimum 110% of optimum moisture to a depth of 12 inches prior to pouring concrete
Embedment*
The minimum outer footing embedment presented herein are based on expansion indexes.  The structural engineer should verify the minimum embedment based on the number of floors supported by the footings, the structural loading, and the requirements of the latest California Building Code. If mat slabs are utilized, alternate embedment depths can be provided.

Moisture Barrier
A moisture barrier should be provided in accordance with the recommendations presented in Section 7.2 The parameters presented herein are based on procedures presented in the Design of Post‐Tensioned Slabs‐On‐ Ground, Third Edition. No corrections for vertical barriers at the edge of the slab, or for adjacent vegetation have been assumed. The design parameters are based on a Constant Suction Value of 3.9 pF.

7.2 Moisture Barrier
A moisture and vapor retarding system should be placed below the slabs‐on‐ grade in portions of the structure considered to be moisture sensitive and should be capable of effectively preventing the migration of water and reducing the transmission of water vapor to acceptable levels. Historically, a 10‐mil plastic membrane, such as Visqueen, placed between one to four inches of clean sand, has been used for this purpose. The use of this system or other systems can be considered, at the discretion of the designer, provided the system reduces the vapor transmission rates to acceptable levels.

Item #6. Page 513
Meeting Date: 9/24/2024 / Packet Page #: 649
Project Number 1‐0486   Page 22
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.3 Seismic Design
The site classes were determined based on the referenced reports and published geologic maps in the area in general conformance with Chapter 20 of ASCE 7‐16.

Based on the density of the underlying soils, a Site Class of D (shear wave velocity of 259 m/s) was selected. The seismic design parameters were calculated using a program based on the USGS website and ASCE 7‐16 procedures. It is our understanding that based on the proposed structures, code allows or the use of an alternate method to calculate SD1, assuming the structure has a fundamental period that does not exceed 0.5s.  The resulting values are presented in Table 7‐4.

If the structures have fundamental periods exceeding 0.5s, then a site‐specific strong motion analysis shall be performed.

TABLE 7‐4 Seismic Ground Motion Values
2022 CBC and ASCE 7‐16
Parameter Value
Site Class D
Site Latitude 34.1294
Site Longitude ‐117.8538
Spectral Response Acceleration Parameter, SS 1.667
Spectral Response Acceleration Parameter, S1 0.631
Site Coefficient, Fa 1.0
Site Coefficient, Fv   1.7
MCE Spectral Response Acceleration Parameter, SMS 1.667 MCE Spectral Response Acceleration Parameter, SM1 1.073 Design Spectral Response Acceleration Parameter, SDS 1.111 Design Spectral Response Acceleration Parameter, SD1 0.715 Peak Ground Acceleration, PGAM 0.78
Item #6. Page 514
Meeting Date: 9/24/2024 / Packet Page #: 650
Project Number 1‐0486   Page 23
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.4 Block Walls
Block walls, if used, should be embedded a minimum of 2 feet below the lowest adjacent grade. Construction joints (not more than 20 feet apart) should be included in the block wall construction. Side yard walls should be structurally separated from the rear yard wall.

7.5 Footing Excavations
Soils from the footing excavations should not be placed in slab‐on‐grade areas unless properly compacted and tested. The excavations should be cleaned of all loose/sloughed materials and be neatly trimmed at the time of concrete placement. The Project Geotechnical Consultant should observe the footing excavations prior to the placement of concrete to determine that the excavations are founded in suitably compacted material.

7.6 Retaining Walls
Retaining walls should be founded on engineered fill and should be backfilled with granular soils that allow for drainage behind the wall. Foundations may be designed in accordance with the recommendations presented in Table 7‐1, above. Unrestrained walls, free to horizontally move 0.0005H (for dense cohesionless backfill), may be designed to resist lateral pressures imposed by a fluid with a unit weight determined in accordance with the Table 7‐5 below. The table also presents design parameters for restrained (at‐rest) retaining walls.

These parameters may be used to design retaining walls that may be considered as restrained due to the method of construction or location (corner sections of unrestrained retaining walls).

TABLE 7‐5
Equivalent Fluid Pressures for 90% Compacted Fill (Select Material) Backfill Active Pressure (psf/ft) At‐Rest Pressure (psf/ft) Level 35 55
Item #6. Page 515
Meeting Date: 9/24/2024 / Packet Page #: 651
Project Number 1‐0486   Page 24
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

Per the requirements of the 2022 CBC, the seismic force acting on the retaining walls with backfill exceeding 6‐feet in height may be resolved utilizing the formula

15.5H2 lb/lineal ft (H=height of the wall). This force acts at approximately 0.6H above the base of the wall (inverted triangle). The seismic value can be converted as required by the retaining wall engineer. Retaining walls should be designed in general accordance with Section 1807A.2 of the 2022 CBC.  Restrained retaining walls should be designed for “at‐rest” conditions.  The design loads presented in the above table are to be applied on the retaining wall in a horizontal fashion and as such friction between wall and retained soils should not be allowed in the retaining wall analyses.  Additional allowances should be made in the retaining wall design to account for the influence of construction loads, temporary loads, and possible nearby structural footing loads.
 Select backfill should be granular, structural quality backfill with a Sand Equivalent of 20 or better and an ASCE Expansion Index of 20 or less. The backfill must encompass the full active wedge area. The upper one foot of backfill should be comprised of native on‐site soils (see Plate A).  The wall design should include waterproofing (where appropriate) and backdrains or weep holes for relieving possible hydrostatic pressures. The backdrain should be comprised of a 4‐inch perforated PVC pipe in a 1 ft. by 1 ft., ¾‐inch gravel matrix, wrapped with a geofabric. The backdrain should be installed with a minimum gradient of 2 percent and should be outletted to an appropriate location. For subterranean walls this may include drainage by sump pumps.
 No backfill should be placed against concrete until minimum design strengths are achieved.

It should be noted that the allowable bearing and lateral bearing values presented in Table 7‐1 are based on level conditions at the toe. Modified design parameters can be presented for retaining walls with sloping condition at the toe.

Other conditions should be evaluated on a case‐by‐case basis.

Item #6. Page 516
Meeting Date: 9/24/2024 / Packet Page #: 652

RETAINING WALL BACKFILL DETAIL
NATIVE

BACKFILL
12 tN. MtN.
*OR AS MODIFIED

BY A SPECIFIC REPORT
DRAIN I.ATERALLY,

OR PROVIDE WEEP

HOLES AS REQUIRED

TO DMIN
PIPE: 4-INCH PERFORATED PVC, SCHEDULE 40, SDR35 OR APPROVED ALTERNATE MINIMUM 8 PERFORATIONS (1/4-IN. DIA.) PER LINEAL FT. IN BOTTOM HALF OF PIPE
ROCK: MINIMUM VOLUME OF 1 CU. FT. OF 3/4_IN. MAX. ROCK PER. LINEAL FOOT

OF PIPE, OR APPROVED ALTERNATE
FILTER FABRIC: MIRAFI 140 FILTER FABRIC OR APPROVED EQUIVALENT "64
ALTA cALTFoRNTA eEorEcl{NrcAL, tNc,
'vER, tTto PI-ATE A
PATH: S\Drofllns\ALTA GEoTECHNICAI\GRAoING DETAIIS\PLATE A.dws Item #6. Page 517
Meeting Date: 9/24/2024 / Packet Page #: 653
Project Number 1‐0486   Page 25
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.7 Exterior Slabs and Walkways
Exterior concrete slabs and walkways should be designed and constructed in consideration of the following recommendations.

7.7.1 Subgrade Compaction
The subgrade below exterior concrete slabs should be compacted to a minimum of 90 percent relative compaction as determined by ASTM Test Method: D 1557.

7.7.2 Subgrade Moisture
The subgrade below concrete slabs should be moisture conditioned to a minimum of 110 percent of optimum moisture (low expansion) prior to concrete placement.

7.7.3 Concrete Slab Thickness
Concrete flatwork and driveways should be designed utilizing four‐inch minimum thickness.

7.7.4 Concrete Slab Reinforcement
Utilization of reinforcement for flatwork and driveways is subject to a cost/benefit analysis. Reinforcement will decrease the amount of cracking that may occur in flatwork, however, planning for occasional repairs may be more cost effective. Utilizing closely spaced control joints is likely more cost‐effective than utilizing reinforcement. The majority of the soils onsite are classified as very low in expansion potential.

Consideration should be given to reinforcing flatwork with irregular (non‐ square/rectangular) shapes.

7.7.5 Control Joints
Weakened plane joints should be installed on walkways at intervals of approximately eight feet (maximum) or less. Exterior slabs should be designed to withstand shrinkage of the concrete.

Item #6. Page 518
Meeting Date: 9/24/2024 / Packet Page #: 654
Project Number 1‐0486   Page 26
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.8 Concrete Design
As stated in Section 5.1.7, negligible concentrations of sulfates were detected in the onsite soils. Therefore, the use of sulfate resistant concrete is not required per ACI 318‐14 at this time. Post‐grading conditions should be evaluated, and final recommendations made at that time.

7.9 Corrosion
Based on preliminary testing, the onsite soils are mildly corrosive to buried metal objects. Consideration should be given to protecting buried metals from corrosion. Typical measures may include using non‐corrosive backfill, protective coatings, wrapping, plastic pipes, or a combination of these methods. A corrosion engineer should be consulted if specific design recommendations are required by the improvement designer.

Per ACI 318‐14, an exposure class of C1 would be applicable to metals encased in concrete (rebar in footings) due to being exposed to moisture from surrounding soils. Per Table 19.3.2.1 of ACI 318‐14, the requirements for concrete with an exposure class of C1 are a minimum compressive strength of 2500 psi and a maximum water‐soluble chloride ion content in concrete of 0.30 (percent by weight of cement).

7.10 Site Drainage
Positive drainage away from the proposed structures should be provided and maintained. Roof, pad, and lot drainage should be collected and directed away from the structures toward approved disposal areas through drainage terraces, gutters, down drains, and other devices. Design fine grade elevations should be maintained through the life of the structure or if design fine grade elevations are altered, adequate area drains should be installed in order to provide rapid discharge of water, away from structures. Residents or Homeowner Associations should be made aware that they are responsible for maintenance and cleaning of Item #6. Page 519
Meeting Date: 9/24/2024 / Packet Page #: 655
Project Number 1‐0486   Page 27
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
all drainage terraces, down drains, and other devices that have been installed to promote site and structure drainage.

7.11 Pavement Design
Pavement sections for the proposed streets shall be designed based on laboratory testing conducted on samples taken from the soil subgrade.

Preliminarily, based on an assumed R‐Value of 30, the pavement may be designed utilizing the sections presented in Table 7‐6. These sections should be verified upon the completion of grading, based on R‐Value testing.

Table 7‐6
Preliminary Pavement Sections
Traffic
Index
Pavement Section Options
OR

5.0 3‐inch AC on 5.5‐inch AB   4‐inch AC on 4‐inch AB

5.5 3‐inch AC on 7‐inch AB   4‐inch AC on 5‐inch AB

6.0 3.5‐inch AC on 7.5‐inch AB   4‐inch AC on 6.5‐inch AB AC‐Asphalt Concrete
AB‐Caltrans Class II Base
The underlying subgrade soil should be suitably moisture conditioned, processed and compacted to a minimum of 90 percent of the laboratory maximum density (ASTM: D 1557) to at least twelve (12) inches below subgrade. After subgrade compaction, the exposed grade should then be "proof"‐rolled with heavy equipment to ensure the grade does not "pump" and is verified as non‐yielding.

Aggregate base should consist of Class 2 (Caltrans) aggregate base and should be compacted to at least 95 percent of the maximum laboratory dry density as determined in accordance with ASTM Test Method: D 1557.

Preparation for compaction operations and pavement construction operations should be accomplished in accordance with the current requirements of the City of Glendora and under the observation and testing of the project geotechnical consultant.

Item #6. Page 520
Meeting Date: 9/24/2024 / Packet Page #: 656
Project Number 1‐0486   Page 28
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

8.0 LOT MAINTENANCE
Ongoing maintenance of the improvements is essential to the long‐term performance of structures. As such, the owners must implement certain maintenance procedures. The attached " Maintenance and Improvement Considerations" presented in the Appendix E may be included as part of the sales packet to educate the owners in issues related to drainage, maintenance, backyard improvements, etc. The following recommendations should also be implemented.

8.1 Lot Drainage
Roof, pad, and lot drainage should be collected and directed away from structures and slopes and toward approved disposal areas. Design fine grade elevations should be maintained through the life of the structure or if design fine grade elevations are altered, adequate area drains should be installed in order to provide rapid discharge of water, away from structures and slopes. Residents should be made aware that they are responsible for maintenance and cleaning of all drainage terraces, down drains, and other devices that have been installed to promote structure and slope stability.

8.2 Burrowing Animals
Residents or owners should undertake a program for the elimination of burrowing animals.

9.0 FUTURE PLAN REVIEWS
This report represents a geotechnical review of the site. As the project design for the project progresses, site specific geologic and geotechnical issues should be considered in the design and construction of the project. Consequently, future plan reviews may be necessary. These reviews may include reviews of:
 Grading Plans
 Foundation Plans
 Utility Plans
Item #6. Page 521
Meeting Date: 9/24/2024 / Packet Page #: 657
Project Number 1‐0486   Page 29
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

These plans should be forwarded to the project Geotechnical Consultant for review.

10.0 CLOSURE

10.1 Geotechnical Review
For the purposes of this report, multiple working hypotheses were established for the project, utilizing the available data and the most probable model is used for the analysis. Future information collected during the proposed grading operations is intended to evaluate the hypothesis and as such, some of the assumptions summarized in this report may need to be changed. Some modifications of the grading recommendations may become necessary, should the conditions encountered in the field differ from the conditions hypothesized in this report.

Plans and sections of the project specifications should be reviewed by Alta to evaluate conformance with the intent of the recommendations contained in this report. If the project description or final design varies from that described in herein, Alta must be consulted regarding the applicability of the recommendations contained herein and whether any changes are required. Alta accepts no liability for any use of its recommendations if the project description or final design varies and Alta is not consulted regarding the alterations.

10.2 Limitations
This report is based on the following: 1) the project as presented on the attached plan; 2) the information obtained from Alta's laboratory testing included herein; and 3) from the information presented in the referenced reports. The findings and recommendations are based on the results of the subsurface investigation, laboratory testing, and office analysis combined with an interpolation and extrapolation of conditions between and beyond the subsurface excavation locations. However, the materials adjacent to or beneath those observed may have different characteristics than those observed, and no precise Item #6. Page 522
Meeting Date: 9/24/2024 / Packet Page #: 658
Project Number 1‐0486   Page 30
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
representations are made as to the quality or extent of the materials not observed.  The results reflect an interpretation of the direct evidence obtained.

Work performed by Alta has been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the geotechnical profession currently practicing in the same locality under similar conditions. The methods used to develop the recommendations do not comprise an exact science and are not a guarantee that the interaction between the soils and proposed structures shall perform as planned. No other representation, either expressed or implied, and no warranty or guarantee is included or intended.

The recommendations presented in this report are based on the assumption that an appropriate level of field review will be provided by a geotechnical consultant who is familiar with the design and site geologic conditions.  That field review shall be sufficient to confirm that geotechnical and geologic conditions exposed during grading are consistent with the geologic representations and corresponding recommendations presented in this report.

The conclusions and recommendations included in this report are applicable to the specific design of this project as discussed in this report. They have no applicability to any other project or to any other location and any and all subsequent users accept any and all liability resulting from any use or reuse of the data, opinions, and recommendations without the prior written consent of Alta.

Alta has no responsibility for construction means, methods, techniques, sequences, procedures, safety precautions, programs in connection with the construction, acts or omissions of the CONTRACTOR or any other person performing any of the construction, or for the failure of any of them to carry out the construction in accordance with the final design drawings and specifications.

Item #6. Page 523
Meeting Date: 9/24/2024 / Packet Page #: 659
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX A

REFERENCES
Item #6. Page 524
Meeting Date: 9/24/2024 / Packet Page #: 660
Project Number 1‐0486   Page A‐1
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX A
Selected References
California Geological Survey, 2018, Earthquake Fault Zones, A Guide for Government Agencies, Property Owners/Developers, and Geoscience Practitioners for Assessing Fault Rupture Hazards in California, Special Publication 42, Revised 2018.

California Division of Mines and Geology, 1998, Seismic Hazard Zone Report for the Glendora

7.5‐Minute Quadrangle, Los Angeles County, California, Seismic Hazard Zone Report 025.

California Geological Survey, 1999, Earthquake Zones of Required Investigation Glendora Quadrangle, Scale 1:24,000, Official Map Released March 25, 1999.

California Code of Regulations, 2019, California Building Code, Title 24, Part 2, Volume 2, Based on the 2015 International Building Code, Effective Date January 1, 2020.

California Department of Water Resources, Water Data Library (WDL) Station Map, https://wdl.water.ca.gov/, accessed September 2022.

Historic Aerials, 2023, www.historicaerials.com, by NETROnline, Copyright 2023, accessed June, 2023, online review of vintage air photos from 1948‐2020.

Jennings, C. W., 1985, An explanatory text to accompany the 1:750,000 scale fault and geologic maps of California:  California Division of Mines and Geology, Bulletin 201, 197 p.

Jennings, C.W., and Bryant, W.A., 2010, Fault Activity Map of California: California Geological Survey Geologic Data Map No. 6, map scale 1:750,000.

Jennings, C. W., and Bryant, W.A., 2010, An explanatory text to accompany the 1:750,000 scale fault and geologic map of California:  California Division of Mines and Geology, special publication 42, revised 1985, 24 p.

Romanoff, Melvin, 1989, Underground Corrosion, NBS Circular 579, Reprinted by NACE, Houston, TX, 1989.

U.S. Geological Survey, 2013, Seismic Design Maps,
http://earthquake.usgs.gov/hazards/designmaps/usdesign.php U.S. Geological Survey, 2008, National Seismic Hazards Maps – Source Parameters, http://geohazards.usgs.gov/cfusion/hazfaults_2008_search/query_main.cfm.

Item #6. Page 525
Meeting Date: 9/24/2024 / Packet Page #: 661
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX B
Subsurface Investigation
Item #6. Page 526
Meeting Date: 9/24/2024 / Packet Page #: 662
Project Number 1‐0486   Page B‐1
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX B
Subsurface Investigation
Alta's subsurface investigation consisted of excavating, logging, and sampling four (4) hollow‐ stem auger borings. Details of the subsurface investigation are presented in Table B. The approximate location of the exploratory excavation is shown on the accompanying Plate 1 and the Geotechnical Logs are attached.

TABLE B

SURFACE INVESTIGATION DETAILS
Equipment Range of
Depths
Sampling Methods Sample Locations
Hollow‐
stem auger
Up to 26 feet 1. Bulk

2. Ring Samples

1. Bulk‐Select Depth

2. Every 2.5 to 5‐feet
Item #6. Page 527
Meeting Date: 9/24/2024 / Packet Page #: 663

UNIFIED SOI L CLASSIFIICATION SYSTEM
Major Divisions lfl tr Description Major Divisions an tr Coarse
Grained
Soils
N4ore than
50%
retained on
No 200
steve
Gravel
and
Sravelly
Soils
han 50%
frachon
relained
on No, 4
'l
ts
*
,-l*
EIF
GW
Well-graded grcvels or gravel sand
mixtures, little or no fines
Fine
(lrained
isoils
l\lore than
Silts
And
Clays
LL,<50
n
ML
Inorganic silts and very fine sands,
rock flour, silty or clayey fine sands
or clavev silts with slioht olasticitv
GP
Poorly-graded gravels or gravel
sand mixture, little or no fines CL
Inorganic clays of low to medium
plasticity, gravelly clays, sandy
clays, silty clays, lean clays Silty gravels, gravel-sand-silt mixtures
OL
Organic silts and organic silt-clays
of low plasticity
Clayey gravels, gravel-sand-clay
mixtures
Silts
And
Clays
LL,<50
MF
Inorganic silts, micaceous or
diatomaceous fine or silty soils,
elastic silts Sand
and
Sandy
Soils
than 50%
fraclion
Passes
on No, 4
i'+.
3_'. JV!
Well-graded sands or gravelly
sands, little or no fines
on No 200
steve VH
Inorganic clays of high plasticity,
fat clays SP
Poorly-graded sands or gravelly
sands, little or no fines
SM Silty sands, sarrd-silt mixtures OF
Organic clays of medium to high
plasticity
sc Clayey sands, and-clay mixtures Highly Organic
Soils PT Peat and other highly organic soils
BoUNDARY CLASSIFICATIoN: Soils possessing characteristics of two groups are designated by combinations of group symbols PARTICLE SIZ:E LIMITS
U.S. STANDA,RD SiERIES SIEVE
200 40 10 4

CLEAR SQUARE SIEVE OPENINGS
3t4" 3,, ,t2"

LABORATORY TESTS
Symbol Tesl
DS
DSR
cc)N
SA
MAX
RV
EI
SE
AL
CHEM
HY
Direct Shear
Direct Shear
(Remolded)
Sieve Analysis
Maximum Density
Resistance (R) Value
Expansion Index
Sand Equivalent
Atterberg Limits
Chemical Analysis
Hydrometer Analysis

SOIL MOISTURE

SIZE PROPORTIONS
Trace - <5%
Few-5to10%
Some - 15 to 25%
Increasing \/isual Moisture Content
Silts
an0
Clays
Sand Gravel
Cobbles Boulders
Fine Medium Coarsi€r Fine Coarse

RELATIVE DENSITY
Sands and Gravels Blows/Foot (SPT)
Very Loose
Loose
Medium Dense
Dense
Very Dense
<4
4-10
11-30
31 -50
>50

CON SI STENCY C IASSI FI CATI ON
Silts and Clays Criteria
Very Soft
Soft
Firm
stiff
Very Stiff
Thumb penetrates soil >1 in.

Thumb penetrates soil 1 in,
Thumb penetrates soil 1/4 in
Readily indented with thumbnail
Thumbnail will not indent soil

HARDNESS
KEY TO EXPLORATORY BORING LOGS}
,n
/L>//J, ALTA CALIFORNTA GEOTECHNTCAL tNC.
/\

PI-ATE B
Item #6. Page 528
Meeting Date: 9/24/2024 / Packet Page #: 664
ARTIFICIAL FILL-UNDOCUMENTED (afu): SILTY SAND, very fine to fine grained, brown, slightly moist, medium dense.
@2.5ft.: GRAVELLY SAND, fine to coarse grained, brown, slightly moist, dense, fine to coarse gravel < 1".

YOUNG ALLUVIAL FAN DEPOSITS (Qyf): GRAVELLY SAND, fine
to coarse grained, dense, coarse gravel < 3".
@10.0ft.: dark brown, very dense.
@15.0ft.: greyish brown,
@20.0ft.: SILTY SAND/CLAYEY SAND, very fine to fine grained, slightly moist, reddish brown, medium dense.
@25.0ft.: GRAVELLY SAND, fine to coarse grained, dark brown, slightly moist, fine to coarse gravel < 1".

TOTAL DEPTH: 26 FEET.

NO GROUNDWATER ENCOUNTERED.

R
R
R
R
R
R
39 65
59 50 for 6"
18 50 for 6"

2.1 2.9

4.2 2.9

13.6 2.6
13 16
19 85
117
112
118
116
SM
SP
SP
SM/SC
SP
5 10
15 20
25 TYPE OF DRILL RIG
DRILLER SAT- MOISTURE CONT (%)
5/24/23
(%) URATION
DATE STARTED 5/24/23
780
775
770
765
760
GEOTECHNICAL DESCRIPTION SAMPLE OTHER ELEV DRY (pcf) DENSITY BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME

DATE FINISHED LM DEPTH
140 lbs.
723-731 E. Route 66 TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0486

GROUNDWATER

SEEPAGE
(Feet)
783 B-1
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE TYPE
1 OF 1
30 in.

Alta California Geotechnical, Inc.

P.N. 1-0486 PLATE B-1
Item #6. Page 529
Meeting Date: 9/24/2024 / Packet Page #: 665
ASPHALT: 1 inch of asphaltic concrete over no aggregate base.

ARTIFICIAL FILL - UNDOCUMENTED: (afu): GRAVELLY SAND,
fine to coarse grained, tannish brown, slightly moist, some fine to coarse gravel < 1".

YOUNG ALLUVIAL FAN DEPOSITS (Qyf): GRAVELLY SAND, fine
to coarse grained, brown, slughtly moist, some gravel < 1". @ 10.0ft.: dark brown, gravel < 3/4".
@15.0ft.: no recovery.
@20.0ft.: no recovery.
@25.0ft.: orange brown, slightly moist, dense, gravel < 1/2".

TOTAL DEPTH: 26 FEET.

NO GROUNDWATER ENCOUNTERED.

R
R
R
R
R
R
40 23
61 50 for

5.5"
50 for 4"
50 for 4"

2.5 8.5

2.3 3.1
12 51
12 17
108
115
109
111
SP
SP
5 10
15 20
25 TYPE OF DRILL RIG
DRILLER SAT- MOISTURE CONT (%)
5/24/23
(%) URATION
DATE STARTED 5/24/23
780
775
770
765
760
755
GEOTECHNICAL DESCRIPTION SAMPLE OTHER ELEV DRY (pcf) DENSITY BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME

DATE FINISHED LM DEPTH
140 lbs.
723-731 E. Route 66 TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0486

GROUNDWATER

SEEPAGE
(Feet)
781 B-2
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE TYPE
1 OF 1
30 in.

Alta California Geotechnical, Inc.

P.N. 1-0486 PLATE B-2
Item #6. Page 530
Meeting Date: 9/24/2024 / Packet Page #: 666
ASPHALT: 1 inch of asphaltic concrete over no aggregate base.

ARTIFICIAL FILL - UNDOCUMENTED (afu): GRAVELLY SAND,
fine to medium grained, tannish brown, slightly moist, gravel < 3". @2.5ft.: no recovery.

YOUNG ALLUVIAL FAN DEPOSITS (Qyf): GRAVELLY SAND, fine
to coarse grained, brown, dry, fine to coarse gravel < 3". @10.0ft.: medium to coarse grained, fine gravel < 3/4". @15.0ft.: no recovery.
@20.0ft.: reddish brown.
@22.0ft.: GRAVEL/COBBLE LAYER ENCOUNTERED.

TOTAL DEPTH: 26 FEET.

NO GROUNDWATER ENCOUNTERED.

R
R
R
R
R
R
54 50 for 6"
38 81
66 50 for 6"

2.6 2.4

3.7 3.6
10 9
14 21
96 97
97 113
SP
SP 5
10 15
20 25

TYPE OF DRILL RIG
DRILLER SAT- MOISTURE CONT (%)
5/24/23
(%) URATION
DATE STARTED 5/24/23
780
775
770
765
760
GEOTECHNICAL DESCRIPTION SAMPLE OTHER ELEV DRY (pcf) DENSITY BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME

DATE FINISHED LM DEPTH
140 lbs.
723-731 E. Route 66 TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0486

GROUNDWATER

SEEPAGE
(Feet)
782 B-3
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE TYPE
1 OF 1
30 in.

Alta California Geotechnical, Inc.

P.N. 1-0486 PLATE B-3
Item #6. Page 531
Meeting Date: 9/24/2024 / Packet Page #: 667
ARTIFICIAL FILL - UNDOCUMENTED (afu): SILTY SAND, very
fine to fine grained, tannish brown, slightly moist, medium dense, some fine gravel< 3/4".

YOUNG ALLUVIAL FAN DEPOSITS (Qyf): GRAVELLY SAND, fine
to coarse gravel, brown, slightly moist, dense, cobble <6". @5.0ft.: no recovery
@7.0ft.: GRAVEL/COBBLE LAYER ENCOUNTERED.
@10.0ft.: no recovery.
@13.0ft.: GRAVEL/COBBLE LAYER ENCOUNTERED.
@15.0ft.: no recovery.
@17.0ft.: REFUSAL.

TOTAL DEPTH: 17 FEET.

NO GROUNDWATER ENCOUNTERED.

R
R
R
R
50 for 6"
44 50 for 6"
50 for 3"
SM
SP
5 10
15 TYPE OF DRILL RIG
DRILLER SAT- MOISTURE CONT (%)
5/24/23
(%) URATION
DATE STARTED 5/24/23
780
775
770
GEOTECHNICAL DESCRIPTION SAMPLE OTHER ELEV DRY (pcf) DENSITY BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME

DATE FINISHED LM DEPTH
140 lbs.
723-731 E. Route 66 TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0486

GROUNDWATER

SEEPAGE
(Feet)
784 B-4
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE TYPE
1 OF 1
30 in.

Alta California Geotechnical, Inc.

P.N. 1-0486 PLATE B-4
Item #6. Page 532
Meeting Date: 9/24/2024 / Packet Page #: 668
ARTIFICIAL FILL-UNDOCUMENTED (afu): SILTY SAND, very fine to fine grained, brown, slightly moist, medium dense.
@2.5ft.: GRAVELLY SAND, fine to coarse grained, brown, slightly moist, dense, fine to coarse gravel < 1".

YOUNG ALLUVIAL FAN DEPOSITS (Qyf): GRAVELLY SAND, fine
to coarse grained, dense, coarse gravel < 3".

TOTAL DEPTH: 10 FEET.

NO GROUNDWATER ENCOUNTERED.

SM
SP
SP 5
10 TYPE OF DRILL RIG
DRILLER SAT- MOISTURE CONT (%)
5/24/23
(%) URATION
DATE STARTED 5/24/23
780
775
GEOTECHNICAL DESCRIPTION SAMPLE OTHER ELEV DRY (pcf) DENSITY BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME

DATE FINISHED LM DEPTH
N/A
723-731 E. Route 66 TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0486

GROUNDWATER

SEEPAGE
(Feet)
782 P-1
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE TYPE
1 OF 1
N/A
Alta California Geotechnical, Inc.

P.N. 1-0486 PLATE B-5
Item #6. Page 533
Meeting Date: 9/24/2024 / Packet Page #: 669
ASPHALT: 1 inch of asphaltic concrete over no aggregate base.

ARTIFICIAL FILL - UNDOCUMENTED (afu): GRAVELLY SAND,
fine to medium grained, tannish brown, slightly moist, gravel < 3".

YOUNG ALLUVIAL FAN DEPOSITS (Qyf): GRAVELLY SAND, fine
to coarse grained, brown, dry, fine to coarse gravel < 3".

TOTAL DEPTH: 10 FEET.

NO GROUNDWATER ENCOUNTERED.

SP
SP 5
10 TYPE OF DRILL RIG
DRILLER SAT- MOISTURE CONT (%)
5/24/23
(%) URATION
DATE STARTED 5/24/23
780
775
GEOTECHNICAL DESCRIPTION SAMPLE OTHER ELEV DRY (pcf) DENSITY BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME

DATE FINISHED LM DEPTH
N/A
723-731 E. Route 66 TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0486

GROUNDWATER

SEEPAGE
(Feet)
784 P-2
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE TYPE
1 OF 1
N/A
Alta California Geotechnical, Inc.

P.N. 1-0486 PLATE B-6
Item #6. Page 534
Meeting Date: 9/24/2024 / Packet Page #: 670
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX C
Laboratory Testing
Item #6. Page 535
Meeting Date: 9/24/2024 / Packet Page #: 671
Project Number 1‐0486   Page C‐1
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

LABORATORY TESTING
The following laboratory tests were performed on a representative sample in accordance with the applicable latest standards or methods from the ASTM, California Building Code (CBC) and California Department of Transportation.

Classification
Soils were classified with respect to the Unified Soil Classification System (USCS) in accordance with ASTM D‐2487 and D‐2488.

Particle Size Analysis
Modified hydrometer testing was conducted to aid in classification of the soil. The results of the particle size analysis are presented in Table C.

Maximum Density/Optimum Moisture
The maximum dry density and optimum moisture content of one representative bulk sample was evaluated in accordance with ASTM D‐1557. The results are summarized in Table C.

Expansion Index Tests
One (1) expansion index test were performed to evaluate the expansion potential of typical on‐ site soil. Testing was carried out in general conformance with ASTM Test Method D‐4829.  The results are presented in Table C.

Consolidation Tests
Consolidation testing was performed on two (2) relatively “undisturbed” soil samples at their natural moisture content in accordance with procedures outlined in ASTM D‐2435.  The samples were placed in a consolidometer and loads were applied incrementally in geometric progression.  The samples (2.42‐inches in diameter and 1‐inch in height) were permitted to consolidate under each load increment until the slope of the characteristic linear secondary compression portion of the thickness versus log of time plot was apparent.  The percent Item #6. Page 536
Meeting Date: 9/24/2024 / Packet Page #: 672
Project Number 1‐0486   Page C‐2
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
consolidation for each load cycle was recorded as the ratio of the amount of vertical compression to the original 1‐inch height.  The consolidation test results are shown on Plates C‐ 1 and C‐2.

Chemical Analyses
Chemical testing was performed on one select sample by Alta. The results of these tests (sulfate content, resistivity, chloride content and pH) are presented on Table C.

Item #6. Page 537
Meeting Date: 9/24/2024 / Packet Page #: 673
B-2 5 Gravelly Sand (Qyf) SP 10 78 9 3 SEE PLATE
C-1
B-3 2.5 Gravelly Sand (afu) SP 125.3 8.7 15 78 4 3 0 MinResist:13,860-OHMCM pH:8.8,Chl:115ppm,So4:<0.01%
B-3 5 Gravelly Sand (Qyf) SP 3 95 1 1 SEE PLATE
C-2

OTHER TESTS

REMARKS

BORING DEPTH
(FEET)

SOIL DESCRIPTION GROUP
SYMBOL
DIRECT
SHEAR

EXPANSION
INDEX
UBC 18-2

MAXIMUM

DENSITY
(PCF)

TABLE C

SUMMARY OF LABORATORY TEST DATA
P.N. 1-0486

OPTIMUM

MOISTURE

CONTENT
(%)
CONSOL
SILT
(0.075mm-0.005mm)
(%)
SAND
(4.76mm-0.075mm)
(%)
PLUS NO.4 SEIVE
(plus 4.76mm)
(%)
CLAY
(minus 0.005mm)
(%)
Alta California Geotechnical, Inc.

Item #6. Page 538
Meeting Date: 9/24/2024 / Packet Page #: 674
-2.0
-1.0
0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 0.1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 910
REMARKS: WATER ADDED AT 1.07 TSF

CONSOLIDATION CURVE PERCENT CHANGE IN HEIGHT
PLATE C-1

COMPRESSIVE STRESS IN TSF
satur. (%)
115
-200
SP Gravelly Sand (Qyf)
boring in situ
51 group typical names density (pcf) sieve (%) symbol

8.5 moist. (%)
dry in situ depth (ft.)
B-2 5.0 12
Alta California Geotechnical, Inc.

P.N. 1-0486
Item #6. Page 539
Meeting Date: 9/24/2024 / Packet Page #: 675
-2.0
-1.0
0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 0.1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 910
REMARKS: WATER ADDED AT 1.07 TSF

CONSOLIDATION CURVE PERCENT CHANGE IN HEIGHT
PLATE C-2

COMPRESSIVE STRESS IN TSF
satur. (%)
96 -200
SP Gravelly Sand (Qyf)
boring in situ
10 group typical names density (pcf) sieve (%) symbol

2.6 moist. (%)
dry in situ depth (ft.)
B-3 5.0 2
Alta California Geotechnical, Inc.

P.N. 1-0486
Item #6. Page 540
Meeting Date: 9/24/2024 / Packet Page #: 676
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX D
Maintenance and Improvement Considerations
Item #6. Page 541
Meeting Date: 9/24/2024 / Packet Page #: 677
Project Number 1‐0486   Page D‐1
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

MAINTENANCE AND IMPROVEMENT CONSIDERATIONS
General
Owners purchasing property must assume a certain degree of responsibility for improvements and for maintaining conditions around their home. Of primary importance from a geotechnical standpoint are maintaining drainage patterns and minimizing the soil moisture variation below all improvements. Such design, construction and owner maintenance provisions may include:
 Employing contractors for improvements who design and build in recognition of local building codes and specific site soils conditions.
 Establishing and maintaining positive drainage away from all foundations, walkways, driveways, patios, and other improvements.
 Avoiding the construction of planters adjacent to structural improvements.

Alternatively, planter sides/bottoms can be sealed with an impermeable membrane and drained away from the improvements via subdrains into approved disposal areas.  Sealing and maintaining construction/control joints within concrete slabs and walkways to reduce the potential for moisture infiltration into the subgrade soils.  Utilizing landscaping schemes with vegetation that requires minimal watering. Watering should be done in a uniform manner, as equally as possible on all sides of the foundation, keeping the soil "moist" but not allowing the soil to become saturated.  Maintaining positive drainage away from structures and providing roof gutters on all structures with downspouts that are designed to carry roof runoff directly into area drains or discharged well away from the foundation areas.  Avoiding the placement of trees closer to the proposed structures than a distance of one‐half the mature height of the tree.
 Observation of the soil conditions around the perimeter of the structure during extremely hot/dry or unusually wet weather conditions so that modifications can be made in irrigation programs to maintain relatively uniform moisture conditions.

Item #6. Page 542
Meeting Date: 9/24/2024 / Packet Page #: 678
Project Number 1‐0486   Page D‐2
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.

Sulfates
Owners should be cautioned against the import and use of certain inorganic fertilizers, soil amendments, and/or other soils from offsite sources in the absence of specific information relating to their chemical composition. Some fertilizers have been known to leach sulfate compounds into soils and increase the sulfate concentrations to potentially detrimental levels.

Site Drainage
 The owners should be made aware of the potential problems that may develop when drainage is altered through construction of hardscape improvements. Ponded water, drainage over the slope face, leaking irrigation systems, overwatering, or other conditions which could lead to ground saturation must be avoided.  No water should be allowed to flow over the slopes. No alteration of pad gradients should be allowed that would prevent pad and roof runoff from being directed to approved disposal areas.
 Drainage patterns have been established at the time of the fine grading should be maintained throughout the life of the structure. No alterations to these drainage patterns should be made unless designed by qualified professionals in compliance with local code requirements and site‐specific soils conditions.

Slope Drainage
 Residents should be made aware of the importance of maintaining and cleaning all interceptor ditches, drainage terraces, down drains, and any other drainage devices, which have been installed to promote slope stability.
 Subsurface drainage pipe outlets may protrude through slope surfaces and/or wall faces. These pipes, in conjunction with the graded features, are essential to slope and wall stability and must be protected in‐place. They should not be altered or damaged in any way.

Planting and Irrigation of Slopes
 Seeding and planting of the slopes should be planned to achieve, as rapidly as possible, a well‐established and deep‐rooted vegetal cover requiring minimal watering.  It is the responsibility of the landscape architect to provide such plants initially and of the residents to maintain such planting. Alteration of such a planting scheme is at the resident's risk.
 The resident is responsible for proper irrigation and for maintenance and repair of properly installed irrigation systems. Leaks should be fixed immediately.

Item #6. Page 543
Meeting Date: 9/24/2024 / Packet Page #: 679
Project Number 1‐0486   Page D‐3
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
 Sprinklers should be adjusted to provide maximum uniform coverage with a minimum of water usage and overlap. Overwatering with consequent wasteful runoff and serious ground saturation must be avoided.
 If automatic sprinkler systems are installed, their use must be adjusted to account for seasonal and natural rainfall conditions.

Burrowing Animals
 Residents must undertake a program to eliminate burrowing animals. This must be an ongoing program in order to promote slope stability.

Owner Improvement
Owner improvements (pools, spas, patio slabs, retaining walls, planters, etc.) should be designed to account for the terrain of the project, as well as expansive soil conditions and chemical characteristics. Design considerations on any given lot may need to include provisions for differential bearing materials, ascending/descending slope conditions, bedrock structure, perched (irrigation) water, special geologic surcharge loading conditions, expansive soil stresses, and long‐term creep/settlement.

All owner improvements should be designed and constructed by qualified professionals utilizing appropriate design methodologies, which account for the on‐site soils and geologic conditions.

Each lot and proposed improvement should be evaluated on an individual basis.

Setback Zones
Manufactured slopes may be subject to long‐term settlement and creep that can manifest itself in the form of both horizontal and vertical movement. These movements typically are produced as a result of weathering, erosion, gravity forces, and other natural phenomenon. A setback adjacent to slopes is required by most building codes, including the California Building Code.

This zone is intended to locate and support the residential structures away from these slopes and onto soils that are not subject to the potential adverse effects of these natural phenomena.

The owner may wish to construct patios, walls, walkways, planters, swimming pools, spas, etc. within this zone. Such facilities may be sensitive to settlement and creep and should not be constructed within the setback zone unless properly engineered. It is suggested that plans for Item #6. Page 544
Meeting Date: 9/24/2024 / Packet Page #: 680
Project Number 1‐0486   Page D‐4
June 22, 2023
ALTA CALIFORNIA GEOTECHNICAL, INC.
such improvements be designed by a professional engineer who is familiar with grading ordinances and design and construction requirements. In addition, we recommend that the designer and contractor familiarize themselves with the site specific geologic and geotechnical conditions on the specific lot.

Item #6. Page 545
Meeting Date: 9/24/2024 / Packet Page #: 681
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX E
Earthwork Specifications
Item #6. Page 546
Meeting Date: 9/24/2024 / Packet Page #: 682
Item #6. Page 547
Meeting Date: 9/24/2024 / Packet Page #: 683
Item #6. Page 548
Meeting Date: 9/24/2024 / Packet Page #: 684
Item #6. Page 549
Meeting Date: 9/24/2024 / Packet Page #: 685
Item #6. Page 550
Meeting Date: 9/24/2024 / Packet Page #: 686
Item #6. Page 551
Meeting Date: 9/24/2024 / Packet Page #: 687
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX F
Grading Details
Item #6. Page 552
Meeting Date: 9/24/2024 / Packet Page #: 688
Item #6. Page 553
Meeting Date: 9/24/2024 / Packet Page #: 689
Item #6. Page 554
Meeting Date: 9/24/2024 / Packet Page #: 690
Item #6. Page 555
Meeting Date: 9/24/2024 / Packet Page #: 691
Item #6. Page 556
Meeting Date: 9/24/2024 / Packet Page #: 692
Item #6. Page 557
Meeting Date: 9/24/2024 / Packet Page #: 693
Item #6. Page 558
Meeting Date: 9/24/2024 / Packet Page #: 694
Item #6. Page 559
Meeting Date: 9/24/2024 / Packet Page #: 695
Item #6. Page 560
Meeting Date: 9/24/2024 / Packet Page #: 696
Item #6. Page 561
Meeting Date: 9/24/2024 / Packet Page #: 697
Item #6. Page 562
Meeting Date: 9/24/2024 / Packet Page #: 698
Item #6. Page 563
Meeting Date: 9/24/2024 / Packet Page #: 699
Item #6. Page 564
Meeting Date: 9/24/2024 / Packet Page #: 700
Item #6. Page 565
Meeting Date: 9/24/2024 / Packet Page #: 701
Item #6. Page 566
Meeting Date: 9/24/2024 / Packet Page #: 702
Item #6. Page 567
Meeting Date: 9/24/2024 / Packet Page #: 703
Item #6. Page 568
Meeting Date: 9/24/2024 / Packet Page #: 704
Item #6. Page 569
Meeting Date: 9/24/2024 / Packet Page #: 705
Item #6. Page 570
Meeting Date: 9/24/2024 / Packet Page #: 706
Item #6. Page 571
Meeting Date: 9/24/2024 / Packet Page #: 707
Item #6. Page 572
Meeting Date: 9/24/2024 / Packet Page #: 708
Initial Study/Mitigated Negative Declaration July 2024
Brandywine Route 66 Residential – PLN 23-0027

Page 163 ends

Appendix F
723-745 East Route 66 Multi-Family Residential Development Greenhouse Gas Screening Letter
Ldn Consulting, Inc.

December 8, 2023
Item #6. Page 573
Meeting Date: 9/24/2024 / Packet Page #: 709
23811 Washington Ave, C110-333, Murrieta, CA 92562 phone 760-473-1253 12/8/2023 1 23-67 723-745 Route 66 Glendora GHG
December 8, 2023
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
RE: 723-745 Route 66 Multi-Family Residential Development Greenhouse Gas Screening Letter – City of Glendora
The purpose of this greenhouse gas screening letter is to identify potential Greenhouse Gas impacts, if any, which may be created from the construction and operation of the proposed 39 unit multi-family residential Project otherwise known as the “723-745 Route 66 Multi-Family Residential Development”. The project proposes the construction of six 3-story multi-family residential buildings consisting of 39 townhomes/flats within a 1.85-acre project site. The current use of the Project area is a Vehicle Service and sales lot with an existing 6,000 Square Foot building onsite.

Project Description
The Project is located on an approximate located at 723-745 East Route 66 in the City of Glendora within the San Gabriel Valley in the County of Los Angeles. The project is generally located north of Interstate 210 (I-210) and east of State Route 39 (SR-39) between Glendora Avenue and Lone Hill Avenue. Glendora Avenue and Lone Hill Avenue provide regional access to the project site via I-210 to the south. The project site is surrounded by existing retail uses to the east and west, existing single-family residences to the north, and East Route 66 to the south. Existing multi-family residential uses are located across Route 66 to the south. The Foothill Gold Line within the Los Angeles Metro Rail system is located adjacent to the project to the north and is currently under construction to build an extension to the light rail system.

The Project is expected to begin demolition of the existing building and lot mid-year 2024 and start construction shortly thereafter. Construction completion and operations would be expected sometime in 2025. Once construction is completed the proposed project would generate operational air quality emissions. These operational emissions would originate from normal residential operations.

GHG impacts related to construction and daily operations were calculated using the latest CalEEMod 2022.1 air quality and GHG model developed by South Coast Air Quality Management District (SCAQMD). CalEEMod now is a web-based software and is updated regularly. Currently Item #6. Page 574
Meeting Date: 9/24/2024 / Packet Page #: 710
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 2 23-67 723-745 Route 66 Glendora GHG
the version being used is 2022.1.1.20. The City of Glendora recognizes this model as an acceptable model for projects of this nature. The GHG modeling is proved as Attachment A to this report. Conservatively, modeling assumed 43 units as a worst case scenario.

GHG Significance Thresholds
The City does not have any specific GHG guidelines or policies. Given this, the City recommends GHG thresholds developed by South Coast Air Quality Management District (SCAQMD) should be followed. Within SCAQMD, the district has followed Tier 3 screening standards and Tier 4 Performance standards as the baseline for significance thresholds. Under this methodology, Tier 3 screening values are established at 3,000 MT/year CO2e for residential/commercial uses and 10,000 MT/year CO2e for industrial projects (South Coast Air Quality Management District, 2013).

Project Related Construction Emissions
Construction of the project would likely begin shortly after the approval of the Proposed Project and permits are issued. An existing 6,000 Square Foot (SF) structure exists onsite which will be demolished as part of this Project. In addition, the Project site is paved with asphalt and concrete and would require demolition and recycling of the materials offsite. This analysis assumes construction begins mid-year 2024 and would be completed later in 2025. CalEEMod default settings were used which are based on the project site size and number of units proposed. The proposed construction schedule and construction equipment list is identified in Table 1 on the following page.

Item #6. Page 575
Meeting Date: 9/24/2024 / Packet Page #: 711
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 3 23-67 723-745 Route 66 Glendora GHG
Table 1: Proposed Construction Phase and Duration
Equipment Identification Proposed Start Proposed
Completion Quantity
Demolition 6/1/2024 6/29/2024
Tractors/Loaders/Backhoes 3
Rubber Tired Dozers 1
Concrete/Industrial Saws 1
Site Preparation 6/30/2024 7/2/2024
Graders 1
Rubber Tired Dozers 1
Tractors/Loaders/Backhoes 1
Grading 7/3/2024 7/8/2024
Graders 1
Tractors/Loaders/Backhoes 2
Rubber Tired Dozers 1
Building Construction 7/9/2024 4/15/2025
Cranes 1
Forklifts 1
Generator Sets 1
Tractors/Loaders/Backhoes 1
Welders 3
Paving 4/16/2025 4/30/2025
Tractors/Loaders/Backhoes 1
Pavers 1
Paving Equipment 1
Rollers 1
Cement and Mortar Mixers 1
Architectural Coating 4/2/2025 4/15/2025
Air Compressors 1
This equipment list is based upon equipment inventory and estimates within CalEEMod using default settings.

As shown in Table 2 on the following page, GHG Emissions during construction would not exceed 3,000 MT CO2e per year screening threshold. Therefore, a less than significant GHG impact would be expected during construction.

Item #6. Page 576
Meeting Date: 9/24/2024 / Packet Page #: 712
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 4 23-67 723-745 Route 66 Glendora GHG
Table 2: Expected Annual Construction CO2e Emissions Summary (MT/Year) Year CO2 CH4 N2O Refrigerants CO2e
2024 168 0.01 0.005 0.06 169
2025 86.5 0.005 0.005 0.03 87.1
Significance Threshold 3,000
GHG Impact No
Project Related Operational Emissions
As previously discussed, operational emissions from Area, Energy, Mobile sources are also calculated within CalEEMod. The program is largely based on default settings which are automatically populated throughout the model based on the imputed land use. Southern California Edison averages for utility emissions were utilized for the calculations throughout the model. The model assumes that residential units include a mix of various hearth options. Since the Project would not install hearth options, all hearths were removed from the model.

Operational emissions are identified in Table 3.

Table 3: Expected Operational Emissions Summary MT/Year Year Bio-CO2 NBio-CO2 Total CO2 CH4 N2O Refrigerants CO2e (MT/Yr)
Mobile * 365 365 0.02 0.02 0.6 371
Area * 0.74 0.74 < 0.005 < 0.005 * 0.74
Energy * 87.6 87.6 0.01 < 0.005 * 87.9
Water 0.51 1.73 2.23 0.05 < 0.005 * 3.92
Waste 2.83 0 2.83 0.28 0 * 9.9
Refrigerants * * * * * 0.05 0.05
Total Operations (MT/Year) 473
Significance Threshold 3,000
GHG Impact No
Data is presented in decimal format and may have rounding errors. * No Data Provided
Based upon the findings for the proposed project, neither the daily construction activities nor the daily operational activities would generate yearly GHG emissions in excess of SCAQMD 3,000 MT CO2e threshold and would be considered less than significant. As such the proposed project would not be required to develop any mitigative GHG reduction designs other than to Item #6. Page 577
Meeting Date: 9/24/2024 / Packet Page #: 713
Brandywine Homes
Attn: Chris Courtney
16580 Aston
Irvine, CA 92606
23811 Washington Ave, C1110-333
Murrieta CA 92562
phone 760-473-1253
12/8/2023 5 23-67 723-745 Route 66 Glendora GHG
demonstrate compliance with state regulated energy and water conservation strategies under current building codes. For purposes of the proposed project, no impacts are anticipated and no further analysis is required. If you have any questions, please do not hesitate to contact me directly at (760) 473-1253.

Sincerely,
Ldn Consulting, Inc.

Jeremy Louden
Attachment A: CalEEMod Model Results
References:

South Coast Air Quality Management District. (2013, October 15). Minutes for the GHG CEQA Significance Threshold. Retrieved from http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/greenhouse-gases-(ghg)-ceqa-significance-thresholds/year2008-2009/ghg-meeting-15/ghg-meeting-15-minutes.pdf?sfvrsn=2 Item #6. Page 578
Meeting Date: 9/24/2024 / Packet Page #: 714
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 1 / 79
723-745 Route 66 Multi-Family Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

2.3. Construction Emissions by Year, Mitigated

2.4. Operations Emissions Compared Against Thresholds

2.5. Operations Emissions by Sector, Unmitigated

2.6. Operations Emissions by Sector, Mitigated

3. Construction Emissions Details

3.1. Demolition (2024) - Unmitigated

3.2. Demolition (2024) - Mitigated
Item #6. Page 579
Meeting Date: 9/24/2024 / Packet Page #: 715
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 2 / 79

3.3. Site Preparation (2024) - Unmitigated

3.4. Site Preparation (2024) - Mitigated

3.5. Grading (2024) - Unmitigated

3.6. Grading (2024) - Mitigated

3.7. Building Construction (2024) - Unmitigated

3.8. Building Construction (2024) - Mitigated

3.9. Building Construction (2025) - Unmitigated

3.10. Building Construction (2025) - Mitigated

3.11. Paving (2025) - Unmitigated

3.12. Paving (2025) - Mitigated

3.13. Architectural Coating (2025) - Unmitigated

3.14. Architectural Coating (2025) - Mitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.1.2. Mitigated

4.2. Energy
Item #6. Page 580
Meeting Date: 9/24/2024 / Packet Page #: 716
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 3 / 79

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.2. Electricity Emissions By Land Use - Mitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.2.4. Natural Gas Emissions By Land Use - Mitigated

4.3. Area Emissions by Source

4.3.1. Unmitigated

4.3.2. Mitigated

4.4. Water Emissions by Land Use

4.4.1. Unmitigated

4.4.2. Mitigated

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated

4.5.2. Mitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.6.2. Mitigated

4.7. Offroad Emissions By Equipment Type
Item #6. Page 581
Meeting Date: 9/24/2024 / Packet Page #: 717
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 4 / 79

4.7.1. Unmitigated

4.7.2. Mitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.8.2. Mitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.9.2. Mitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated

4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated

4.10.6. Avoided and Sequestered Emissions by Species - Mitigated

5. Activity Data

5.1. Construction Schedule
Item #6. Page 582
Meeting Date: 9/24/2024 / Packet Page #: 718
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 5 / 79

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.2.2. Mitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.3.2. Mitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.9.2. Mitigated
Item #6. Page 583
Meeting Date: 9/24/2024 / Packet Page #: 719
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 6 / 79

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.1.2. Mitigated

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.10.4. Landscape Equipment - Mitigated

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.11.2. Mitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.12.2. Mitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.13.2. Mitigated

5.14. Operational Refrigeration and Air Conditioning Equipment Item #6. Page 584
Meeting Date: 9/24/2024 / Packet Page #: 720
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 7 / 79

5.14.1. Unmitigated

5.14.2. Mitigated

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.15.2. Mitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1.2. Mitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.1.2. Mitigated

5.18.2. Sequestration
Item #6. Page 585
Meeting Date: 9/24/2024 / Packet Page #: 721
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 8 / 79

5.18.2.1. Unmitigated

5.18.2.2. Mitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
Item #6. Page 586
Meeting Date: 9/24/2024 / Packet Page #: 722
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 9 / 79

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name 723-745 Route 66 Multi-Family
Construction Start Date 6/1/2024
Operational Year 2025
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.80
Precipitation (days) 13.2
Location 723-745 E Rte 66, Glendora, CA 91740, USA
County Los Angeles-South Coast
City Glendora
Air District South Coast AQMD
Air Basin South Coast
TAZ 5049
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.20

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Item #6. Page 587
Meeting Date: 9/24/2024 / Packet Page #: 723
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 10 / 79
Condo/Townhouse 43.0 Dwelling Unit 1.55 45,580 0.75 — 127 — Parking Lot 30.0 Space 0.25 0.00 0.00 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure Title
Construction C-6 Use Diesel Particulate Filters

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 29.5 12.8 15.6 0.03 0.57 2.89 3.35 0.52 1.37 1.78 — 2,913 2,913 0.12 0.07 2.28 2,937 Mit. 29.5 12.8 15.6 0.03 0.09 2.89 2.96 0.08 1.37 1.43 — 2,913 2,913 0.12 0.07 2.28 2,937 %
Reduced
— — — — 85% — 12% 85% — 20% — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.57 10.4 12.5 0.02 0.50 0.44 0.95 0.46 0.11 0.57 — 2,364 2,364 0.10 0.05 0.06 2,381 Mit. 0.57 10.4 12.5 0.02 0.08 0.44 0.52 0.07 0.11 0.18 — 2,364 2,364 0.10 0.05 0.06 2,381 %
Reduced
— — — — 85% — 45% 85% — 69% — — — — — — —
Average
Daily
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 588
Meeting Date: 9/24/2024 / Packet Page #: 724
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 11 / 79
Unmit. 0.92 4.47 5.43 0.01 0.21 0.22 0.43 0.19 0.06 0.25 — 1,016 1,016 0.04 0.02 0.35 1,024 Mit. 0.92 4.47 5.43 0.01 0.03 0.22 0.25 0.03 0.06 0.09 — 1,016 1,016 0.04 0.02 0.35 1,024 %
Reduced
— — — — 85% — 41% 85% — 64% — — — — — — —
Annual
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.17 0.82 0.99 < 0.005 0.04 0.04 0.08 0.04 0.01 0.05 — 168 168 0.01 < 0.005 0.06 169 Mit. 0.17 0.82 0.99 < 0.005 0.01 0.04 0.05 0.01 0.01 0.02 — 168 168 0.01 < 0.005 0.06 169 %
Reduced
— — — — 85% — 41% 85% — 64% — — — — — — —

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 12.8 15.6 0.03 0.54 2.89 3.35 0.49 1.37 1.78 — 2,913 2,913 0.12 0.07 2.13 2,937 2025 29.5 11.5 14.1 0.02 0.57 0.52 1.10 0.52 0.12 0.65 — 2,594 2,594 0.11 0.05 2.28 2,615 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 10.4 12.5 0.02 0.50 0.44 0.95 0.46 0.11 0.57 — 2,364 2,364 0.10 0.05 0.06 2,381 2025 0.56 10.4 12.4 0.02 0.50 0.44 0.95 0.46 0.11 0.57 — 2,353 2,353 0.10 0.05 0.05 2,370 Average
Daily
— — — — — — — — — — — — — — — — —
2024 0.23 4.47 5.43 0.01 0.21 0.22 0.43 0.19 0.06 0.25 — 1,016 1,016 0.04 0.02 0.35 1,024 2025 0.92 2.31 2.80 < 0.005 0.11 0.10 0.21 0.10 0.02 0.13 — 522 522 0.02 0.01 0.19 526 Annual — — — — — — — — — — — — — — — — —
2024 0.04 0.82 0.99 < 0.005 0.04 0.04 0.08 0.04 0.01 0.05 — 168 168 0.01 < 0.005 0.06 169 Item #6. Page 589
Meeting Date: 9/24/2024 / Packet Page #: 725
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 12 / 79
2025 0.17 0.42 0.51 < 0.005 0.02 0.02 0.04 0.02 < 0.005 0.02 — 86.5 86.5 < 0.005 < 0.005 0.03 87.1

2.3. Construction Emissions by Year, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 12.8 15.6 0.03 0.08 2.89 2.96 0.08 1.37 1.43 — 2,913 2,913 0.12 0.07 2.13 2,937 2025 29.5 11.5 14.1 0.02 0.09 0.52 0.61 0.08 0.12 0.20 — 2,594 2,594 0.11 0.05 2.28 2,615 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — —
2024 0.57 10.4 12.5 0.02 0.08 0.44 0.52 0.07 0.11 0.18 — 2,364 2,364 0.10 0.05 0.06 2,381 2025 0.56 10.4 12.4 0.02 0.08 0.44 0.52 0.07 0.11 0.18 — 2,353 2,353 0.10 0.05 0.05 2,370 Average
Daily
— — — — — — — — — — — — — — — — —
2024 0.23 4.47 5.43 0.01 0.03 0.22 0.25 0.03 0.06 0.09 — 1,016 1,016 0.04 0.02 0.35 1,024 2025 0.92 2.31 2.80 < 0.005 0.02 0.10 0.11 0.02 0.02 0.04 — 522 522 0.02 0.01 0.19 526 Annual — — — — — — — — — — — — — — — — —
2024 0.04 0.82 0.99 < 0.005 0.01 0.04 0.05 0.01 0.01 0.02 — 168 168 0.01 < 0.005 0.06 169 2025 0.17 0.42 0.51 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 0.01 — 86.5 86.5 < 0.005 < 0.005 0.03 87.1

2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 590
Meeting Date: 9/24/2024 / Packet Page #: 726
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 13 / 79
Unmit. 2.50 1.23 13.3 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 3,085 3,105 2.20 0.11 9.68 3,202 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 2.27 1.30 9.99 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 2,971 2,992 2.20 0.12 0.57 3,081 Average
Daily
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 2.28 1.21 10.9 0.02 0.04 1.99 2.03 0.04 0.51 0.54 20.2 2,747 2,767 2.19 0.10 3.94 2,857 Annual
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.42 0.22 1.98 < 0.005 0.01 0.36 0.37 0.01 0.09 0.10 3.34 455 458 0.36 0.02 0.65 473

2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Area 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.50 1.23 13.3 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 3,085 3,105 2.20 0.11 9.68 3,202 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Item #6. Page 591
Meeting Date: 9/24/2024 / Packet Page #: 727
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 14 / 79
Area 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.27 1.30 9.99 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 2,971 2,992 2.20 0.12 0.57 3,081 Average
Daily
— — — — — — — — — — — — — — — — —
Mobile 1.06 0.94 9.09 0.02 0.01 1.99 2.01 0.01 0.51 0.52 — 2,204 2,204 0.11 0.09 3.62 2,238 Area 1.21 0.02 1.67 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 4.47 4.47 < 0.005 < 0.005 — 4.48 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.28 1.21 10.9 0.02 0.04 1.99 2.03 0.04 0.51 0.54 20.2 2,747 2,767 2.19 0.10 3.94 2,857 Annual — — — — — — — — — — — — — — — — —
Mobile 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Area 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74 Energy < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 87.6 87.6 0.01 < 0.005 — 87.9 Water — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92 Waste — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90 Refrig. — — — — — — — — — — — — — — — 0.05 0.05
Total 0.42 0.22 1.98 < 0.005 0.01 0.36 0.37 0.01 0.09 0.10 3.34 455 458 0.36 0.02 0.65 473

2.6. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item #6. Page 592
Meeting Date: 9/24/2024 / Packet Page #: 728
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 15 / 79
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Area 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.50 1.23 13.3 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 3,085 3,105 2.20 0.11 9.68 3,202 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Mobile 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Area 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.27 1.30 9.99 0.03 0.04 2.24 2.28 0.04 0.57 0.61 20.2 2,971 2,992 2.20 0.12 0.57 3,081 Average
Daily
— — — — — — — — — — — — — — — — —
Mobile 1.06 0.94 9.09 0.02 0.01 1.99 2.01 0.01 0.51 0.52 — 2,204 2,204 0.11 0.09 3.62 2,238 Area 1.21 0.02 1.67 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 4.47 4.47 < 0.005 < 0.005 — 4.48 Energy 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 529 529 0.05 < 0.005 — 531 Water — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Waste — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Refrig. — — — — — — — — — — — — — — — 0.33 0.33
Total 2.28 1.21 10.9 0.02 0.04 1.99 2.03 0.04 0.51 0.54 20.2 2,747 2,767 2.19 0.10 3.94 2,857 Item #6. Page 593
Meeting Date: 9/24/2024 / Packet Page #: 729
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 16 / 79
Annual — — — — — — — — — — — — — — — — —
Mobile 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Area 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74 Energy < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 87.6 87.6 0.01 < 0.005 — 87.9 Water — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92 Waste — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90 Refrig. — — — — — — — — — — — — — — — 0.05 0.05
Total 0.42 0.22 1.98 < 0.005 0.01 0.36 0.37 0.01 0.09 0.10 3.34 455 458 0.36 0.02 0.65 473

3. Construction Emissions Details

3.1. Demolition (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.47 12.5 14.6 0.02 0.53 — 0.53 0.48 — 0.48 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — 0.19 0.19 — 0.03 0.03 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Item #6. Page 594
Meeting Date: 9/24/2024 / Packet Page #: 730
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 17 / 79
Off-Road 0.03 0.68 0.80 < 0.005 0.03 — 0.03 0.03 — 0.03 — 137 137 0.01 < 0.005 — 137 Equipment
Demolitio
n
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.15 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 22.6 22.6 < 0.005 < 0.005 — 22.7 Demolitio
n
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.94 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 176 176 0.01 0.01 0.70 179 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 0.30 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 243 243 0.01 0.04 0.56 256 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.30 9.30 < 0.005 < 0.005 0.02 9.43 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13.3 13.3 < 0.005 < 0.005 0.01 14.0 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.54 1.54 < 0.005 < 0.005 < 0.005 1.56 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 2.21 2.21 < 0.005 < 0.005 < 0.005 2.32 Item #6. Page 595
Meeting Date: 9/24/2024 / Packet Page #: 731
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 18 / 79

3.2. Demolition (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.47 12.5 14.6 0.02 0.08 — 0.08 0.07 — 0.07 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — 0.19 0.19 — 0.03 0.03 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.03 0.68 0.80 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 137 137 0.01 < 0.005 — 137 Demolitio
n
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 22.6 22.6 < 0.005 < 0.005 — 22.7 Demolitio
n
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Item #6. Page 596
Meeting Date: 9/24/2024 / Packet Page #: 732
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 19 / 79
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.94 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 176 176 0.01 0.01 0.70 179 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 0.30 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 243 243 0.01 0.04 0.56 256 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.30 9.30 < 0.005 < 0.005 0.02 9.43 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13.3 13.3 < 0.005 < 0.005 0.01 14.0 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.54 1.54 < 0.005 < 0.005 < 0.005 1.56 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 2.21 2.21 < 0.005 < 0.005 < 0.005 2.32

3.3. Site Preparation (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.35 9.24 11.9 0.02 0.38 — 0.38 0.34 — 0.34 — 2,064 2,064 0.08 0.02 — 2,071 Item #6. Page 597
Meeting Date: 9/24/2024 / Packet Page #: 733
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 20 / 79
Dust — — — — — 2.44 2.44 — 1.17 1.17 — — — — — — —
From
Material
Movement
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.05 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.3 11.3 < 0.005 < 0.005 — 11.3 Dust
From
Material
Movement
— — — — — 0.01 0.01 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.87 1.87 < 0.005 < 0.005 — 1.88 Dust
From
Material
Movement
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.04 0.57 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 106 106 < 0.005 < 0.005 0.42 107 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 598
Meeting Date: 9/24/2024 / Packet Page #: 734
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 21 / 79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.56 0.56 < 0.005 < 0.005 < 0.005 0.57 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.09 0.09 < 0.005 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.4. Site Preparation (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.35 9.24 11.9 0.02 0.06 — 0.06 0.05 — 0.05 — 2,064 2,064 0.08 0.02 — 2,071 Dust
From
Material
Movement
— — — — — 2.44 2.44 — 1.17 1.17 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 599
Meeting Date: 9/24/2024 / Packet Page #: 735
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 22 / 79
Average — — — — — — — — — — — — — — — — —
Daily
Off-Road
Equipment
< 0.005 0.05 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.3 11.3 < 0.005 < 0.005 — 11.3 Dust
From
Material
Movement
— — — — — 0.01 0.01 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.87 1.87 < 0.005 < 0.005 — 1.88 Dust
From
Material
Movement
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.04 0.57 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 106 106 < 0.005 < 0.005 0.42 107 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.56 0.56 < 0.005 < 0.005 < 0.005 0.57 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 600
Meeting Date: 9/24/2024 / Packet Page #: 736
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 23 / 79
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.09 0.09 < 0.005 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.5. Grading (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 11.1 14.2 0.02 0.46 — 0.46 0.41 — 0.41 — 2,454 2,454 0.10 0.02 — 2,462 Dust
From
Material
Movement
— — — — — 2.76 2.76 — 1.34 1.34 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.16 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 26.9 26.9 < 0.005 < 0.005 — 27.0 Dust
From
Material
Movement
— — — — — 0.03 0.03 — 0.01 0.01 — — — — — — —
Item #6. Page 601
Meeting Date: 9/24/2024 / Packet Page #: 737
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 24 / 79
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.02 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.45 4.45 < 0.005 < 0.005 — 4.47 Dust
From
Material
Movement
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.04 0.05 0.75 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 141 141 0.01 < 0.005 0.56 143 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.49 1.49 < 0.005 < 0.005 < 0.005 1.51 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.25 0.25 < 0.005 < 0.005 < 0.005 0.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 602
Meeting Date: 9/24/2024 / Packet Page #: 738
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 25 / 79

3.6. Grading (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 11.1 14.2 0.02 0.07 — 0.07 0.06 — 0.06 — 2,454 2,454 0.10 0.02 — 2,462 Dust
From
Material
Movement
— — — — — 2.76 2.76 — 1.34 1.34 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.12 0.16 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 26.9 26.9 < 0.005 < 0.005 — 27.0 Dust
From
Material
Movement
— — — — — 0.03 0.03 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.02 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.45 4.45 < 0.005 < 0.005 — 4.47 Item #6. Page 603
Meeting Date: 9/24/2024 / Packet Page #: 739
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 26 / 79
Dust — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — — From
Material
Movement
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.04 0.05 0.75 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 141 141 0.01 < 0.005 0.56 143 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.49 1.49 < 0.005 < 0.005 < 0.005 1.51 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.25 0.25 < 0.005 < 0.005 < 0.005 0.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.7. Building Construction (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Item #6. Page 604
Meeting Date: 9/24/2024 / Packet Page #: 740
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 27 / 79
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.15 3.46 3.61 0.01 0.17 — 0.17 0.16 — 0.16 — 620 620 0.03 0.01 — 622 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.03 0.63 0.66 < 0.005 0.03 — 0.03 0.03 — 0.03 — 103 103 < 0.005 < 0.005 — 103 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.14 0.15 2.34 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 437 437 0.02 0.01 1.72 444 Vendor < 0.005 0.17 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.40 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 605
Meeting Date: 9/24/2024 / Packet Page #: 741
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 28 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Worker 0.14 0.18 1.97 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 414 414 0.02 0.02 0.04 419 Vendor < 0.005 0.18 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.01 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.05 0.06 0.72 0.00 0.00 0.14 0.14 0.00 0.03 0.03 — 145 145 0.01 0.01 0.26 147 Vendor < 0.005 0.06 0.03 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 51.1 51.1 < 0.005 0.01 0.06 53.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.13 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 24.0 24.0 < 0.005 < 0.005 0.04 24.3 Vendor < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 8.46 8.46 < 0.005 < 0.005 0.01 8.82 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.8. Building Construction (2024) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 606
Meeting Date: 9/24/2024 / Packet Page #: 742
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 29 / 79
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.15 3.46 3.61 0.01 0.03 — 0.03 0.02 — 0.02 — 620 620 0.03 0.01 — 622 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.03 0.63 0.66 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 103 103 < 0.005 < 0.005 — 103 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.14 0.15 2.34 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 437 437 0.02 0.01 1.72 444 Vendor < 0.005 0.17 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.40 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.14 0.18 1.97 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 414 414 0.02 0.02 0.04 419 Vendor < 0.005 0.18 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 148 148 0.01 0.02 0.01 155 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.05 0.06 0.72 0.00 0.00 0.14 0.14 0.00 0.03 0.03 — 145 145 0.01 0.01 0.26 147 Vendor < 0.005 0.06 0.03 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 51.1 51.1 < 0.005 0.01 0.06 53.3 Item #6. Page 607
Meeting Date: 9/24/2024 / Packet Page #: 743
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 30 / 79
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.13 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 24.0 24.0 < 0.005 < 0.005 0.04 24.3 Vendor < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 8.46 8.46 < 0.005 < 0.005 0.01 8.82 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.9. Building Construction (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.50 — 0.50 0.46 — 0.46 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.09 2.07 2.15 < 0.005 0.10 — 0.10 0.09 — 0.09 — 370 370 0.02 < 0.005 — 371 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Item #6. Page 608
Meeting Date: 9/24/2024 / Packet Page #: 744
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 31 / 79
Off-Road
Equipment

0.02 0.38 0.39 < 0.005 0.02 — 0.02 0.02 — 0.02 — 61.3 61.3 < 0.005 < 0.005 — 61.5 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.13 2.15 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 428 428 0.02 0.01 1.57 434 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.40 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.15 1.83 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 406 406 0.02 0.02 0.04 411 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.01 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.39 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 84.6 84.6 < 0.005 < 0.005 0.14 85.7 Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 30.0 30.0 < 0.005 < 0.005 0.04 31.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.0 14.0 < 0.005 < 0.005 0.02 14.2 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.96 4.96 < 0.005 < 0.005 0.01 5.18 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.10. Building Construction (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item #6. Page 609
Meeting Date: 9/24/2024 / Packet Page #: 745
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 32 / 79
Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.42 10.1 10.5 0.02 0.08 — 0.08 0.07 — 0.07 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.09 2.07 2.15 < 0.005 0.02 — 0.02 0.01 — 0.01 — 370 370 0.02 < 0.005 — 371 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.38 0.39 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 61.3 61.3 < 0.005 < 0.005 — 61.5 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.13 2.15 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 428 428 0.02 0.01 1.57 434 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.40 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 610
Meeting Date: 9/24/2024 / Packet Page #: 746
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 33 / 79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.13 0.15 1.83 0.00 0.00 0.40 0.40 0.00 0.09 0.09 — 406 406 0.02 0.02 0.04 411 Vendor < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 146 146 0.01 0.02 0.01 152 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.39 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 84.6 84.6 < 0.005 < 0.005 0.14 85.7 Vendor < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 30.0 30.0 < 0.005 < 0.005 0.04 31.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.0 14.0 < 0.005 < 0.005 0.02 14.2 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.96 4.96 < 0.005 < 0.005 0.01 5.18 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.11. Paving (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.19 5.26 6.65 0.01 0.23 — 0.23 0.21 — 0.21 — 992 992 0.04 0.01 — 995 Paving 0.26 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 611
Meeting Date: 9/24/2024 / Packet Page #: 747
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 34 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.01 0.14 0.18 < 0.005 0.01 — 0.01 0.01 — 0.01 — 27.2 27.2 < 0.005 < 0.005 — 27.3 Paving 0.01 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.50 4.50 < 0.005 < 0.005 — 4.51 Paving < 0.005 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.87 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 173 173 0.01 0.01 0.63 175 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 4.55 4.55 < 0.005 < 0.005 0.01 4.62 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Item #6. Page 612
Meeting Date: 9/24/2024 / Packet Page #: 748
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 35 / 79
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.75 0.75 < 0.005 < 0.005 < 0.005 0.76 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.12. Paving (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.19 5.26 6.65 0.01 0.03 — 0.03 0.03 — 0.03 — 992 992 0.04 0.01 — 995 Paving 0.26 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.01 0.14 0.18 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.2 27.2 < 0.005 < 0.005 — 27.3 Paving 0.01 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.50 4.50 < 0.005 < 0.005 — 4.51 Paving < 0.005 — — — — — — — — — — — — — — — —
Item #6. Page 613
Meeting Date: 9/24/2024 / Packet Page #: 749
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 36 / 79
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 truck
Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.87 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 173 173 0.01 0.01 0.63 175 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 4.55 4.55 < 0.005 < 0.005 0.01 4.62 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.75 0.75 < 0.005 < 0.005 < 0.005 0.76 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.13. Architectural Coating (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 614
Meeting Date: 9/24/2024 / Packet Page #: 750
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 37 / 79
Off-Road 0.05 1.09 0.96 < 0.005 0.07 — 0.07 0.06 — 0.06 — 134 134 0.01 < 0.005 — 134 Equipment
Architectu
ral
Coatings

28.8 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.66 3.66 < 0.005 < 0.005 — 3.67 Architectu
ral
Coatings

0.79 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.61 0.61 < 0.005 < 0.005 — 0.61 Architectu
ral
Coatings

0.14 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.43 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 85.6 85.6 < 0.005 < 0.005 0.31 86.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 615
Meeting Date: 9/24/2024 / Packet Page #: 751
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 38 / 79
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.26 2.26 < 0.005 < 0.005 < 0.005 2.29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.37 0.37 < 0.005 < 0.005 < 0.005 0.38 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.14. Architectural Coating (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.05 1.09 0.96 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architectu
ral
Coatings

28.8 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Item #6. Page 616
Meeting Date: 9/24/2024 / Packet Page #: 752
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 39 / 79
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.66 3.66 < 0.005 < 0.005 — 3.67 Architectu
ral
Coatings

0.79 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.61 0.61 < 0.005 < 0.005 — 0.61 Architectu
ral
Coatings

0.14 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.43 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 85.6 85.6 < 0.005 < 0.005 0.31 86.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.26 2.26 < 0.005 < 0.005 < 0.005 2.29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.37 0.37 < 0.005 < 0.005 < 0.005 0.38 Item #6. Page 617
Meeting Date: 9/24/2024 / Packet Page #: 753
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 40 / 79
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Item #6. Page 618
Meeting Date: 9/24/2024 / Packet Page #: 754
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 41 / 79
Total 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371

4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.21 0.95 10.8 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,539 2,539 0.12 0.10 9.36 2,581 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 1.20 1.04 9.88 0.02 0.02 2.24 2.26 0.02 0.57 0.59 — 2,432 2,432 0.13 0.10 0.24 2,467 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.19 0.17 1.66 < 0.005 < 0.005 0.36 0.37 < 0.005 0.09 0.09 — 365 365 0.02 0.02 0.60 371

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated
Item #6. Page 619
Meeting Date: 9/24/2024 / Packet Page #: 755
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 42 / 79
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 189 189 0.02 < 0.005 — 190
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 189 189 0.02 < 0.005 — 190
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 31.2 31.2 < 0.005 < 0.005 — 31.4
Parking
Lot
— — — — — — — — — — — 1.51 1.51 < 0.005 < 0.005 — 1.52
Total — — — — — — — — — — — 32.7 32.7 < 0.005 < 0.005 — 32.9

4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 620
Meeting Date: 9/24/2024 / Packet Page #: 756
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 43 / 79
Condo/To — — — — — — — — — — — 189 189 0.02 < 0.005 — 190 wnhouse
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 189 189 0.02 < 0.005 — 190
Parking
Lot
— — — — — — — — — — — 9.11 9.11 < 0.005 < 0.005 — 9.16
Total — — — — — — — — — — — 198 198 0.02 < 0.005 — 199
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 31.2 31.2 < 0.005 < 0.005 — 31.4
Parking
Lot
— — — — — — — — — — — 1.51 1.51 < 0.005 < 0.005 — 1.52
Total — — — — — — — — — — — 32.7 32.7 < 0.005 < 0.005 — 32.9

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Item #6. Page 621
Meeting Date: 9/24/2024 / Packet Page #: 757
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 44 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
< 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0

4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse

0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Item #6. Page 622
Meeting Date: 9/24/2024 / Packet Page #: 758
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 45 / 79
Parking 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Lot
Total 0.02 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 331 331 0.03 < 0.005 — 332 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
< 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0 Parking
Lot

0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 0.05 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 54.8 54.8 < 0.005 < 0.005 — 55.0

4.3. Area Emissions by Source

4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.08 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt

0.22 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.52 6.52 < 0.005 < 0.005 — 6.55 Total 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 623
Meeting Date: 9/24/2024 / Packet Page #: 759
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 46 / 79
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.08 — — — — — — — — — — — — — — — —
Total 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.18 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.01 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt

0.03 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.74 0.74 < 0.005 < 0.005 — 0.74 Total 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74

4.3.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Item #6. Page 624
Meeting Date: 9/24/2024 / Packet Page #: 760
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 47 / 79
Architectu 0.08 — — — — — — — — — — — — — — — —
ral
Landscap
e
Equipme
nt

0.22 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.52 6.52 < 0.005 < 0.005 — 6.55 Total 1.27 0.02 2.43 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.52 6.52 < 0.005 < 0.005 — 6.55 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.98 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.08 — — — — — — — — — — — — — — — —
Total 1.06 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products

0.18 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings

0.01 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt

0.03 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.74 0.74 < 0.005 < 0.005 — 0.74 Total 0.22 < 0.005 0.30 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.74 0.74 < 0.005 < 0.005 — 0.74

4.4. Water Emissions by Land Use
Item #6. Page 625
Meeting Date: 9/24/2024 / Packet Page #: 761
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 48 / 79

4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92

4.4.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Item #6. Page 626
Meeting Date: 9/24/2024 / Packet Page #: 762
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 49 / 79
Daily, — — — — — — — — — — — — — — — — —
Summer
(Max)
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 3.07 10.4 13.5 0.32 0.01 — 23.7 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 0.51 1.73 2.23 0.05 < 0.005 — 3.92

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 627
Meeting Date: 9/24/2024 / Packet Page #: 763
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 50 / 79
Condo/To — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 wnhouse
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90

4.5.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Item #6. Page 628
Meeting Date: 9/24/2024 / Packet Page #: 764
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 51 / 79
Daily, — — — — — — — — — — — — — — — — —
Winter
(Max)
Condo/To
wnhouse
— — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 17.1 0.00 17.1 1.71 0.00 — 59.8 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 2.83 0.00 2.83 0.28 0.00 — 9.90

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Item #6. Page 629
Meeting Date: 9/24/2024 / Packet Page #: 765
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 52 / 79
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.05 0.05
Total — — — — — — — — — — — — — — — 0.05 0.05

4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.33 0.33
Total — — — — — — — — — — — — — — — 0.33 0.33
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.05 0.05
Total — — — — — — — — — — — — — — — 0.05 0.05

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Item #6. Page 630
Meeting Date: 9/24/2024 / Packet Page #: 766
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 53 / 79
Equipme ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e nt
Type
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type
Item #6. Page 631
Meeting Date: 9/24/2024 / Packet Page #: 767
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 54 / 79

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Item #6. Page 632
Meeting Date: 9/24/2024 / Packet Page #: 768
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 55 / 79

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Item #6. Page 633
Meeting Date: 9/24/2024 / Packet Page #: 769
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 56 / 79
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Item #6. Page 634
Meeting Date: 9/24/2024 / Packet Page #: 770
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 57 / 79
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Item #6. Page 635
Meeting Date: 9/24/2024 / Packet Page #: 771
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 58 / 79
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —

4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Item #6. Page 636
Meeting Date: 9/24/2024 / Packet Page #: 772
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 59 / 79
Total — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — —

4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Item #6. Page 637
Meeting Date: 9/24/2024 / Packet Page #: 773
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 60 / 79
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 6/1/2024 6/29/2024 5.00 20.0 —
Site Preparation Site Preparation 6/30/2024 7/2/2024 5.00 2.00 — Grading Grading 7/3/2024 7/8/2024 5.00 4.00 —
Building Construction Building Construction 7/9/2024 4/15/2025 5.00 200 — Paving Paving 4/16/2025 4/30/2025 5.00 10.0 —
Architectural Coating Architectural Coating 4/2/2025 4/15/2025 5.00 10.0 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
Item #6. Page 638
Meeting Date: 9/24/2024 / Packet Page #: 774
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 61 / 79
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Backh
oes
Diesel Tier 3 3.00 8.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Tier 3 1.00 8.00 33.0 0.73
Site Preparation Graders Diesel Tier 3 1.00 8.00 148 0.41 Site Preparation Rubber Tired Dozers Diesel Tier 3 1.00 7.00 367 0.40 Site Preparation Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Grading Graders Diesel Tier 3 1.00 8.00 148 0.41
Grading Tractors/Loaders/Backh
oes
Diesel Tier 3 2.00 7.00 84.0 0.37
Grading Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Building Construction Cranes Diesel Tier 3 1.00 6.00 367 0.29 Building Construction Forklifts Diesel Tier 3 1.00 6.00 82.0 0.20 Building Construction Generator Sets Diesel Tier 3 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 6.00 84.0 0.37
Building Construction Welders Diesel Tier 3 3.00 8.00 46.0 0.45 Paving Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Paving Pavers Diesel Tier 3 1.00 6.00 81.0 0.42
Paving Paving Equipment Diesel Tier 3 1.00 8.00 89.0 0.36 Paving Rollers Diesel Tier 3 1.00 7.00 36.0 0.38
Paving Cement and Mortar
Mixers
Diesel Tier 3 1.00 6.00 10.0 0.56
Architectural Coating Air Compressors Diesel Tier 3 1.00 6.00 37.0 0.48

5.2.2. Mitigated
Item #6. Page 639
Meeting Date: 9/24/2024 / Packet Page #: 775
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 62 / 79
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Backh
oes
Diesel Tier 3 3.00 8.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Tier 3 1.00 8.00 33.0 0.73
Site Preparation Graders Diesel Tier 3 1.00 8.00 148 0.41 Site Preparation Rubber Tired Dozers Diesel Tier 3 1.00 7.00 367 0.40 Site Preparation Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Grading Graders Diesel Tier 3 1.00 8.00 148 0.41
Grading Tractors/Loaders/Backh
oes
Diesel Tier 3 2.00 7.00 84.0 0.37
Grading Rubber Tired Dozers Diesel Tier 3 1.00 8.00 367 0.40 Building Construction Cranes Diesel Tier 3 1.00 6.00 367 0.29 Building Construction Forklifts Diesel Tier 3 1.00 6.00 82.0 0.20 Building Construction Generator Sets Diesel Tier 3 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 6.00 84.0 0.37
Building Construction Welders Diesel Tier 3 3.00 8.00 46.0 0.45 Paving Tractors/Loaders/Backh
oes
Diesel Tier 3 1.00 8.00 84.0 0.37
Paving Pavers Diesel Tier 3 1.00 6.00 81.0 0.42
Paving Paving Equipment Diesel Tier 3 1.00 8.00 89.0 0.36 Paving Rollers Diesel Tier 3 1.00 7.00 36.0 0.38
Paving Cement and Mortar
Mixers
Diesel Tier 3 1.00 6.00 10.0 0.56
Architectural Coating Air Compressors Diesel Tier 3 1.00 6.00 37.0 0.48

5.3. Construction Vehicles
Item #6. Page 640
Meeting Date: 9/24/2024 / Packet Page #: 776
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 63 / 79

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 3.45 20.0 HHDT
Demolition Onsite truck — — HHDT
Site Preparation — — — —
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 31.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 4.60 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 12.5 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Item #6. Page 641
Meeting Date: 9/24/2024 / Packet Page #: 777
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 64 / 79
Architectural Coating — — — —
Architectural Coating Worker 6.19 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT

5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 3.45 20.0 HHDT
Demolition Onsite truck — — HHDT
Site Preparation — — — —
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 31.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 4.60 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Item #6. Page 642
Meeting Date: 9/24/2024 / Packet Page #: 778
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 65 / 79
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 12.5 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 6.19 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 92,300 30,767 0.00 0.00 653

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Building Square Footage)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 6,000 —
Site Preparation — — 1.88 0.00 —
Item #6. Page 643
Meeting Date: 9/24/2024 / Packet Page #: 779
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 66 / 79
Grading — — 4.00 0.00 —
Paving 0.00 0.00 0.00 0.00 1.00

5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
Water Demolished Area 2 36% 36%

5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Condo/Townhouse 0.75 100%
Parking Lot 0.25 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2024 0.00 532 0.03 < 0.005
2025 0.00 532 0.03 < 0.005

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Condo/Townhouse 315 350 270 114,394 2,846 3,165 2,442 1,034,489 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Item #6. Page 644
Meeting Date: 9/24/2024 / Packet Page #: 780
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 67 / 79

5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Condo/Townhouse 315 350 270 114,394 2,846 3,165 2,442 1,034,489 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Condo/Townhouse —
Wood Fireplaces 0
Gas Fireplaces 0
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 43
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0

5.10.1.2. Mitigated
Hearth Type Unmitigated (number)
Condo/Townhouse —
Wood Fireplaces 0
Gas Fireplaces 0
Item #6. Page 645
Meeting Date: 9/24/2024 / Packet Page #: 781
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 68 / 79
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 43
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
92299.5 30,767 0.00 0.00 653

5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Item #6. Page 646
Meeting Date: 9/24/2024 / Packet Page #: 782
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 69 / 79
Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Condo/Townhouse 197,463 349 0.0330 0.0040 1,033,305
Parking Lot 9,540 349 0.0330 0.0040 0.00

5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Condo/Townhouse 197,463 349 0.0330 0.0040 1,033,305
Parking Lot 9,540 349 0.0330 0.0040 0.00

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Condo/Townhouse 1,602,773 12.9
Parking Lot 0.00 0.00

5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Condo/Townhouse 1,602,773 12.9
Parking Lot 0.00 0.00

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Item #6. Page 647
Meeting Date: 9/24/2024 / Packet Page #: 783
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 70 / 79
Condo/Townhouse 31.7 —
Parking Lot 0.00 —

5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Condo/Townhouse 31.7 —
Parking Lot 0.00 —

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Condo/Townhouse Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Condo/Townhouse Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00

5.14.2. Mitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Condo/Townhouse Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Condo/Townhouse Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated
Item #6. Page 648
Meeting Date: 9/24/2024 / Packet Page #: 784
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 71 / 79
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor

5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr)

5.17. User Defined
Equipment Type Fuel Type

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres Item #6. Page 649
Meeting Date: 9/24/2024 / Packet Page #: 785
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 72 / 79

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 23.3 annual days of extreme heat Extreme Precipitation 8.80 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 26.6 annual hectares burned
Item #6. Page 650
Meeting Date: 9/24/2024 / Packet Page #: 786
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 73 / 79
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.

Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 3 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 3 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Item #6. Page 651
Meeting Date: 9/24/2024 / Packet Page #: 787
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 74 / 79
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 84.6
AQ-PM 81.8
AQ-DPM 44.1
Drinking Water 51.3
Lead Risk Housing 72.1
Pesticides 0.00
Toxic Releases 67.1
Traffic 94.0
Effect Indicators —
CleanUp Sites 0.00
Item #6. Page 652
Meeting Date: 9/24/2024 / Packet Page #: 788
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 75 / 79
Groundwater 0.00
Haz Waste Facilities/Generators 38.7
Impaired Water Bodies 0.00
Solid Waste 25.7
Sensitive Population —
Asthma 56.5
Cardio-vascular 66.0
Low Birth Weights 14.8
Socioeconomic Factor Indicators —
Education 43.4
Housing 60.9
Linguistic 56.9
Poverty 38.9
Unemployment 62.4

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 46.93956114
Employed 25.29192865
Median HI 45.13024509
Education —
Bachelor's or higher 51.32811497
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Item #6. Page 653
Meeting Date: 9/24/2024 / Packet Page #: 789
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 76 / 79
Auto Access 17.29757475
Active commuting 33.38893879
Social —
2-parent households 39.17618375
Voting 30.01411523
Neighborhood —
Alcohol availability 54.13832927
Park access 30.86102913
Retail density 68.58719364
Supermarket access 55.03657128
Tree canopy 26.03618632
Housing —
Homeownership 34.05620429
Housing habitability 48.76170923
Low-inc homeowner severe housing cost burden 66.95752598 Low-inc renter severe housing cost burden 27.07558065
Uncrowded housing 70.21686129
Health Outcomes —
Insured adults 66.66238932
Arthritis 0.0
Asthma ER Admissions 44.9
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Item #6. Page 654
Meeting Date: 9/24/2024 / Packet Page #: 790
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 77 / 79
Life Expectancy at Birth 27.2
Cognitively Disabled 38.1
Physically Disabled 23.7
Heart Attack ER Admissions 46.6
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 49.9
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 86.0
Elderly 32.8
English Speaking 66.0
Foreign-born 27.7
Outdoor Workers 74.9
Climate Change Adaptive Capacity —
Impervious Surface Cover 56.7
Traffic Density 91.1
Traffic Access 23.0
Other Indices —
Item #6. Page 655
Meeting Date: 9/24/2024 / Packet Page #: 791
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 78 / 79
Hardship 54.6
Other Decision Support —
2016 Voting 44.1

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 56.0 Healthy Places Index Score for Project Location (b) 46.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) Yes Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data
Screen Justification
Land Use PD
Construction: Construction Phases Dates were shifted to include Architectural Coatings during Building Construction Construction: Off-Road Equipment PDF Tier 3 Equipment or Better Construction: Paving Manual updated asphalt onsite
Item #6. Page 656
Meeting Date: 9/24/2024 / Packet Page #: 792
723-745 Route 66 Multi-Family Detailed Report, 12/2/2023 79 / 79
Operations: Hearths no hearth options are installed
Item #6. Page 657
Meeting Date: 9/24/2024 / Packet Page #: 793
Initial Study/Mitigated Negative Declaration July 2024
Brandywine Route 66 Residential – PLN 23-0027

Page 164 ends
← All documents from this meeting