Authorization to Advertise for Bids for the 2025 Residential Resurfacing and Arterial Pavement Projects

Goleta City Council
February 4, 2025

Document
Authorization to Advertise for Bids for the 2025 Residential Resurfacing and Arterial Pavement Projects
Meeting
February 4, 2025
Body
Goleta City Council
Pages
5
Original file
30.9 MB
Text extracted from the city's file for reading and search. Open the original on goleta.legistar1.com. That file is the official record.

Agenda Item D.2

CPMS DISCUSSION/ACTION ITEM
Meeting Date: February 4, 2025
____________________________________________________________ TO: Mayor and Councilmembers
FROM: Luz “Nina” Buelna, Public Works Director
PREPARED BY: Daniel Virgen, Assistant Engineer
SUBJECT: Authorization to Advertise for Bids for the 202 5 Residential Resurfacing and Arterial Pavement Projects
RECOMMENDATION:

Authorize staff to advertise a notice inviting construction bids for the 2025 Residential Resurfacing and Arterial Pavement Projects.

BACKGROUND:

The City of Goleta owns and manages approximately 85 centerline miles of roadways that serve the transportation needs of all roadway users. Roadways include medians, curbs, gutters, sidewalks, landscaping, and traffic signs and signals. The City uses the Pavement Management Program (PMP) to help preserve its roadway assets, which involves monitoring pavement conditions and developing scheduled maintenance activities and projects accordingly. Additionally, the PMP is an essential planning resource, assisting staff in establishing a priority list of roadways for the City's annual pavement projects. Pavement projects can range from resurfacing to complete reconstruction.

The City -hired consultant , Pavement Engineering, Inc. (PEI ), evaluated the City’s roadway network and provided an updated assessment allowing the City to calculate the current pavement condition index (PCI) and run budget scenarios to better understand fiscal impacts and needs. The PCI is a visual representation of a road's condition, ranked on a scale from 1 to 100, with 1 being the worst and 100 being the best. The City’s PCI is currently 58, following the completion of the 2023 Paving Project in the 2024 construction season. Public Works will focus on consistently delivering annual pavement projects to maintain and enhance our streets' condition.

Two pavement projects have been designed to extend the lifespan of the City’s roadways.

The 2025 Arterial Pavement Project targets streets requiring rehabilitation treatment. The 2025 Residential Resurfacing Project focuses on preventi ve maintenance by applying resurfacing treatments such as crack seal and slurry seal. These treatment applications will seal the pavement surface and protect the existing asphalt surface against water 1 Meeting Date: February 4, 2025

Page 2 of 5 ends

intrusion, prevent oxidation of the existing asphalt surface, and provide a new surface with improved skid resistance. Such preventive maintenance will extend the pavement infrastructure's life and improve road users' safety while reducing future repair costs. This approach is more economical to maintain pavement than to repair or replace it after significant damage occurs. Separating both projects can lower the cost of traffic control, subcontractor work, and material markups.

Both projects employ the PMP critical point management approach to choose and prioritize which streets will receive treatment. This critical approach considers pavements at various stages on the deterioration curve rather than focusing solely on those in the best or worst condition. Doing so effectively optimizes the limited budget by ensuring the appropriate treatment is applied to the proper pavement at the right time.

Staff have included the Storke Road/Hollister Avenue Transit, Bike/Ped, and Median Improvements Project (Project N o. 9062) as a bid alternative to the 2025 Arterial Pavement Project to leverage construction bids at a larger scale and use Measure A grant funds awarded to this project. The plans and specifications have been completed as the project aims to improve safety conditions along the existing corridor on Storke Road and at the Storke Road and Hollister Avenue intersection. This project will merge the two southbound bus stops on Storke Road into one, implement median improvements, and improve traffic and bike patterns.

DISCUSSION:

2025 Arterial Pavement Project

This project involves replacing pavement with hot mix asphalt, upgrading American with Disabilities Act (ADA)-compliant curb ramps, and updating traffic striping and markings.

It addresses the pavement replacement needs in a residential neighborhood to prepare the road for the upcoming 2025 Residential Resurfacing Project. The work includes a base bid and additional roadway segments listed as additive alternates, ensuring the budget is utilized to its fullest potential.

The roadway segments for the base and alternative bid locations are shown on the location map (see Attachment 1). These locations include repaving portions of:
 Calle Real
 Northeast Goleta Neighborhood
 Berkeley Road
 Hollister Avenue
 South Fairview Avenue
 Storke Road
 Los Carneros Road

2 Meeting Date: February 4, 2025

Page 3 of 5 ends

2025 Residential Resurfacing Project

This project includes a new pavement surface of slurry seal and replacing traffic striping and markings. The street segments that will be slurry sealed are portions of the Northeast Goleta Neighborhood (See Attachment 4).

Construction for both projects is anticipated to begin in late summer 2025 and be completed by early fall 2025. By bidding the projects around the same time as separate contracts, the City can leverage construction firms to reduce mobilization costs and potentially secure lower bid prices. The bid documents have been structured to ensure that the 2025 Arterial Pavement Project begins before the 2025 Residential Resurfacing Project, addressi ng pavement replacement needs before slurry sealing . All roads will remain open during construction , with work hours adjusted based on each roadway’s traffic characteristics. Due to high daytime traffic volumes on certain roads, nighttime work will likely be required.

Public Outreach

Resurfacing and rehab ilitating neighborhood streets can cause inconvenience s for residents. For instance, there may be instances when on-street parking will be temporarily restricted during the project. Some residents may also be concerned about whether they will still have access to their homes or if garbage collection will conti nue as scheduled.

We recognize these concerns and are committed to addressing the community's needs.

As a result, we prioritize public outreach in our annual resurfacing program. Below is our communication plan:

1. About two months before the planned work, w e send a letter to each resident in the project area explaining the planned work, the type of pavement treatment that will be used, what the residents can expect before, during, and after the project.

We will invite the residents to attend an evening meeti ng scheduled by City staff.

At that meeting, City staff will provide the residents with an overview of our street maintenance program and what the project in their neighborhood would entail. We then answer any questions the residents may have. We hold thi s meeting about one month before the planned work.

2. About two weeks before the planned work, a letter is sent to each resident in the project area, reminding them of the upcoming work. The letter includes information very similar to what was included in the first letter and a color-coded map showing which streets are planned to be slurry sealed on which dates.

3. Five working days before work begins on any given street, the contractor hangs a notice on the door at each residence listing the street, date, and times of prohibited parking.

4. 72 hours before the work is to begin on any given street, the contractor places temporary “no parking” signs mounted on barricades along the street. These signs contain the days and times when parking will be prohibited. 3 Meeting Date: February 4, 2025

Page 4 of 5 ends

FISCAL IMPACTS:

2025 Arterial Pavement Project

The engineer's estimate for the construction cost of the base bid for the 2025 Arterial Pavement Project is $ 8,100,190, while the estimated cost for the additive alternates 1 through 5 is $7,812,775. The combined construction cost of the base bid and the additive alternates is approximately $15,912,965.

Table 1 shows the total estimated project costs and base bid construction costs.

Table 1: Project Cost Estimates for the 2025 Arterial Pavement Project (Base Bid)

Project Components Estimated Costs
Design (Consultant) $234,104
Construction (Base Bid) $8,100,190
Construction Contingency/CCO $1,620,038
CM (Consultant) $1,749,641
Staff Time $87,000
Total: $11,790,973

Table 2: Proposed Construction Engineer's Estimates for the 2025 Arterial Pavement Project (Additive Alternates)

Project Components Estimated Costs
Construction (additive alternates) $7,812,775

2025 Residential Resurfacing Project

The engineer's estimate for the construction cost of the 2025 Residential Resurfacing Project is $765,142. The table below details the total estimated project costs.

Table 3: Project Cost Estimates for the 2025 Residential Resurfacing Project

Project Components Estimated Costs
Design (Consultant) $41,312
Construction $765,142
Construction Contingency/CCO $153,028
CM (Consultant & Staff) $165,270
Staff Time $54,000
Total: $1,178,752
4 Meeting Date: February 4, 2025

Page 5 of 5 ends

Based on the engineer’s estimate, s ufficient funds are available to cover the base bids for both projects , but the selection of the bid alternative s will depend on the bid pricing received. Public Works staff is collaborating with the Finance Department to identify additional funding sources as needed. The pro ject funding will utilize a combination of General Fund, Gas Tax, Local Surface Transportation Program (LSTP), Measure A, and Road Maintenance and Rehabilitation Account—Senate Bill 1 (RMRA-SB1) resources.

ALTERNATIVES:

The City Council may elect not to authorize staff to advertise for construction bids for the 2025 Residential Resurfacing and Arterial Pavement Projects. Doing so would delay the project schedule and construction.

Legal Review By: Isaac Rosen, Acting City Attorney

Approved By: Robert Nisbet, City Manager

ATTACHMENTS:

1. 2025 Arterial Pavement Project Location Map

2. 2025 Arterial Pavement Project – Plans

3. 2025 Arterial Pavement Project – Specifications

4. 2025 Residential Resurfacing Project Location Map

5. 2025 Residential Resurfacing Project – Plans

6. 2025 Residential Resurfacing Project – Specifications

7. Pavement Management Program PowerPoint Presentation
5 ATTACHMENT 1

2025 ARTERIAL PAVEMENT PROJECT LOCATION MAP
6 PACIFIC OCEAN

NO SCALE
7 ATTACHMENT 2

2025 ARTERIAL PAVEMENT PROJECT PLANS
8 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:55 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

CONSTRUCTION DRAWINGS
2025 ARTERIAL PAVEMENT PROJECT
FOR

VARIOUS STREETS

LOCATION PLAN

NOT TO SCALE
217

SHEET INDEX
SHEET
NUMBER

STREET NAME /

SHEET DESCRIPTION

BASE BID /

BID ALTERNATE
1 TITLE SHEET -
2 GENERAL NOTES -
3 TYPICAL SECTIONS -
4 DETAILS -
5 - 8 CALLE REAL
(NORTH KELLOGG AVENUE TO CITY LIMITS) BASE BID
9 - 12 BERKELEY ROAD
(NORTH FAIRVIEW AVENUE TO SYLVAN DRIVE) BASE BID
13 - 26 NORTHEAST GOLETA NEIGHBORHOOD BASE BID
27 - 32 HOLLISTER AVENUE
(CATHEDRAL OAKS ROAD TO PEBBLE BEACH DRIVE) BASE BID
33 - 34 HOLLISTER AVENUE
(CAMINO REAL MARKETPLACE TO STORKE ROAD) BASE BID
35 - 36 SOUTH FAIRVIEW AVENUE
(SOUTH FAIRVIEW AVENUE TO NORTH END) BASE BID
37 - 38 STORKE ROAD
(HOLLISTER AVENUE TO BOLLAY DRIVE) BID ALTERNATE 1
39 - 40 CALLE REAL
(CALAVERAS AVENUE TO SONOMA AVENUE) BID ALTERNATE 2
41 - 44 BERKELEY ROAD
(SYLVAN DRIVE TO EAST END) BID ALTERNATE 3
45 LOS CARNEROS ROAD
(HOLLISTER AVENUE TO CASTILIAN DRIVE) BID ALTERNATE 4
46 - 48 CALLE REAL
(ROCHESTER WAY TO SALISBURY AVENUE) BID ALTERNATE 5
49 - 52 CURB RAMP SUMMARY TABLES & PAY ITEMS -
53 - 57 CURB RAMP ENLARGEMENTS -
THE STORKE ROAD / HOLLISTER AVE. TRANSIT, BIKE /
PED, AND MEDIAN IMPROVEMENTS (30 TOTAL SHEETS)

CITY PROJECT
NUMBER 9062

UTILITY CONTACT LIST

UTILITY CONTACT PHONE NUMBER

GOLETA SANITARY
DISTRICT LUIS ASTORGA 805.967.4519

GOLETA WEST
SANITARY DISTRICT JUAN RAMIREZ 805.968.2617

GOLETA WATER
DISTRICT DAN BROOKS 805.964.6761

SOUTHERN CALIFORNIA
GAS COMPANY SHAWN LEE 805.535.5901

TITLE SHEET
9 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:14 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

GENERAL NOTES
GENERAL HMA & PCC CONSTRUCTION NOTES:

1. PRIOR TO INSTALLATION OF NEW CONCRETE FACILITIES, CONTRACTOR SHALL COORDINATE WITH CITY REPRESENTATIVE FOR TRIMMING OR REMOVA L OF PRIVATE LANDSCAPE PLANTINGS. NO PLANT MATERIAL SHALL BE ALTERED OR OTHERWISE REMOVED WITHOUT PRIOR APPROVAL OF THE CITY.

2. CURB RAMP SHALL BE CONSTRUCTED BASED ON CALTRANS 2018 STANDARD PLANS A88A & A88B AND THE PUBLIC RIGHTS OF WAY ACCESSIBILITY G UIDELINES (PROWAG). REFER TO STANDARD PLANS A88A & A88B FOR ADDITIONAL DETAILS & INFORMATION.

3. CONCRETE FACILITIES SHALL BE CONSTRUCTED PER THE SEPTEMBER 2011 EDITION OF THE SANTA BARBARA COUNTY STANDARD DETAILS (UNLESS OTHERWISE INDICATED):
x CURB & GUTTER* . . . . . . . . . . . . . . . . . . . . . . . . . #4-030 & 4-045 x SIDEWALK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4-045, 5-010 & 5-040 x TYPE A CURB . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4-030 x CROSS-GUTTER & SPANDREL . . . . . . . . . . . . . . #4-020 x SIDEWALK UNDERDRAIN . . . . . . . . . . . . . . . . . . #3-060 x DRIVEWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4-040 *CURB & GUTTER WIDTH SHALL WIDEN TO A 24" GUTTER PAN IN FRONT OF CURB RAMP LANDING THEN TAPER BACK TO THE ORIGINAL WIDTH UNLESS OTHERWISE NOTED ON PLANS.

5. PCC SIDEWALKS AND CURB RAMPS SHALL BE MIN. 6" THICK.

6. ALL FACES OF NEW OR RECONSTRUCTED CURBS SHALL BE MIN. 6".

7. ALL SAWCUTTING THROUGH CONCRETE & ASPHALT PAVEMENT SHALL BE SQUARE AND EXTEND FULL-DEPTH OF THE MATERIAL. SAWCUTS IN CONCRET E SHALL ALWAYS BE ON AN EXISTING JOINT LINE UNLESS OTHERWISE ALLOWED BY THE CITY'S REPRESENTATIVE PRIOR TO CUTTING. ANY CHIPPED, BROKEN OR

OTHERWISE IRREGULAR CONCRETE OR ASPHALT PAVEMENT EDGES SHALL BE RE-SAWCUT AS DIRECTED BY THE CITY'S REPRESENTATIVE PRIOR TO REPLACING CONCRETE OR HOT-MIX ASPHALT MATERIAL.

8. NEW CONCRETE FACILITIES SHALL BE DOWELED & EPOXIED TO EX. CONCRETE USING 18" LONG #4 BARS, EMBEDDED MINIMUM 9" AND SPACED @ 1 2" O.C. MAX.

NEAREST DOWEL TO OUTERMOST FACE OF CONCRETE SHALL BE NO CLOSER THAN 3" UNLESS OTHERWISE DIRECTED BY CITY REPRESENTATIVE.

9. HMA REPLACEMENT AGAINST NEW CONCRETE SHALL EXTEND AT LEAST 2' FROM THE EDGE OF THE CONCRETE, AND EXTEND TO A DEPTH OF 0.67' O R MATCH EX., WHICHEVER IS GREATER.

10. SEVERAL REMOVE & REPLACE AREAS WITHIN THE PAVEMENTS INCLUDE PRUNING & REMOVING EXISTING TREE ROOTS. IN ADDITION, THE CONTRAC TOR SHALL ANTICIPATE PRUNING & REMOVING EX. TREE ROOTS AT ALL CONCRETE FACILITIES TO BE CONSTRUCTED OR REMOVED & REPLACED. NO TREE ROOTS SHALL BE CUT WITHOUT PRIOR REVIEW AND APPROVAL BY CITY ARBORIST.

11. IF NECESSARY, TREE CANOPIES SHALL BE TRIMMED AS NEEDED TO PROVIDE AT LEAST 15' OF CLEARANCE ABOVE ROADWAY SURFACES. TREE CANOPIES SHALL NOT BE TRIMMED WITHOUT PRIOR REVIEW AND APPROVAL BY CITY ARBORIST.

12. LANDSCAPE RESTORATION SHALL CONSIST OF SALVAGING & REPLACING LANDSCAPING MATERIALS BEHIND NEW CONCRETE CONSTRUCTION. THESE MATERIALS MAY INCLUDE BUT ARE NOT LIMITED TO: BARK MULCH, DECORATIVE ROCK, COBBLE OR BOULDERS, CONCRETE PAVERS, BRICK, TURF, & DECORATIVE EDGING.

CONTRACTOR SHALL DISTURB EX. LANDSCAPE MATERIALS TO THE MINIMUM AMOUNT POSSIBLE DURING DEMOLITION, LAYOUT & CONSTRUCTION OF RAMPS.

WHERE MATERIALS MUST BE DISTURBED OR REMOVED, CONTRACTOR SHALL CAREFULLY SALVAGE & STORE ON-SITE SAID MATERIALS UNTIL CURB RAMP

CONSTRUCTION IS APPROVED BY THE CITY'S REPRESENTATIVE, AFTER WHICH SALVAGED MATERIALS SHALL BE RESTORED TO THEIR ORIGINAL PLACEMENT & CONDITION. IF EXISTING MATERIALS CANNOT BE SALVAGED, CONTRACTOR SHALL PROCURE & INSTALL W/SAME MATERIALS.

13. LANDSCAPE RESTORATION MAY ALSO INCLUDE REPAIR OR REPLACEMENT OF DAMAGED IRRIGATION FACILITIES CAUSED BY THE CONTRACTOR'S EFF ORTS.

CONTRACTOR SHALL EXERCISE REASONABLE CAUTION DURING DEMOLITION & CONSTRUCTION TO AVOID DAMAGING IRRIGATION DRIPLINES, LATERAL LINES, VALVES, POP-UP SPRINKLERS, ETC. ANY DAMAGED IRRIGATION FACILITIES SHALL BE REPAIRED OR RESTORED TO WORKING ORDER TO THE SATISFACTION OF THE CITY'S REPRESENTATIVE.

14. ALL EXISTING FACILITIES ADJACENT TO ZONE OF CONSTRUCTION SHALL BE PROTECTED AT ALL TIMES BY THE CONTRACTOR TO AVOID DAMAGE T O SAID FACILITIES. IF IT IS THE CONTRACTOR'S OPINION THAT ITEM(S) CANNOT BE PROTECTED IN PLACE DURING THE WORK, CONTRACTOR SHALL NOTIFY THE CITY'S REPRESENTATIVE IN ADVANCE OF STARTING THE WORK. ANY ITEMS WHICH ARE TEMPORARILY RELOCATED TO AVOID DAMAGE SHALL BE REPLACED TO THEIR ORIGINAL LOCATION & CONDITION AT THE COMPLETION OF THE WORK. ANY FACILITIES WHICH ARE FOUND TO BE MISSING OR DAMAGED SHALL BE REPLACED AT THE CONTRACTOR'S SOLE EXPENSE & TO THE SATISFACTION OF THE CITY'S REPRESENTATIVE.

15. EXISTING UTILITY LIDS WITHIN AREA OF WORK SHALL BE ADJUSTED TO FINISHED GRADE UNLESS OTHERWISE INDICATED.

16. NOTIFY ENGINEER OF RECORD IF DISCREPANCIES ARE FOUND BETWEEN PROJECT DOCUMENTS AND ACTUAL CONDITIONS PRIOR TO CONTINUATION O F WORK.

17. COUNTER SLOPES OF ADJOINING GUTTERS AND ROAD SURFACES IMMEDIATELY ADJACENT TO AND WITHIN 2' OF THE CURB RAMP LANDING SHALL N OT BE GREATER THAN 5%.

ABBREVIATIONS

AB AGGREGATE BASE
BEG. BEGIN

C&G CURB & GUTTER
CONT. CONTINUED

EP EDGE OF PAVEMENT
EX. EXISTING

FL FLOWLINE

GB GRADE BREAK

HMA HOT MIX ASPHALT

LF LINEAR FEET

MAT'L MATERIAL
MAX. MAXIMUM
MIN. MINIMUM
NO. NUMBER
N.S. NO SLOPE

NTS NOT TO SCALE
O.S. ON CENTER

PCC PORTLAND CEMENT CONCRETE

R&R REMOVE & REPLACE
R.C. RELATIVE COMPACTION

SF SQUARE FEET

STA STATION

SW SIDEWALK

TC TOP OF CURB

TP TOP OF PAVEMENT

W/ WITH
LEGEND
REMOVE & REPLACE 3" HMA

FULL DEPTH RECLAMATION (SEE PLAN FOR TYPICAL SECTION)

COLD PLANE & REPLACE (SEE PLAN FOR TYPICAL SECTION)
COLD PLANE & REPLACE (TYPICAL SECTION NO. 4)
COLD PLANE & REPLACE (TYPICAL SECTION NO. 4)
TYPE A1 KEYCUT
TYPE B1 KEYCUT

CRACK SEAL & MICRO-SURFACING WITH BLACK ROCK

PROPOSED PCC IMPROVEMENTS

TRANSVERSE PAVING LIMIT

REMOVE & REPLACE TRAFFIC LOOPS
ELECTRICAL VAULT (EX.)
WIRELESS TRAFFIC SENSOR (EX.)

BORING LOCATIONXX
STORM DRAIN MANHOLE (EX.)
SANITARY SEWER MANHOLE (EX.)

PROPOSED STORKE ROAD MODIFIED MEDIAN
SEWER CLEANOUT (EX.)
TELECOMMUNICATIONS MANHOLE (EX.)

BLUE RETROREFLECTIVE PAVEMENT MARKER
FIRE HYDRANT (EX.)
SURVEY MONUMENT (EX.)
SURVEY NAIL (EX.)
WATER VALVE (EX.)
GAS VALVE (EX.)
XX CURB RAMP REFERENCE NUMBER (SEE SHEETS 49 - 52 FOR QUANTITIES & NOTES)

REMOVE & REPLACE TYPE A HMA DIKE
CONCRETE EDGE (EX.)
PAVEMENT EDGE (EX.)
HMA DIKE (EX.)

INSTALL SHOULDER BACKING

R PRUNE & REMOVE TREE ROOTS
GENERAL NOTES:

1. STATIONING IS SHOWN ON PLAN SHEETS AND FOR REFERENCE ONLY UNLESS OTHERWISE INDICATED.

2. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING ALL STRIPING WITHIN LIMITS OF WORK. STRIPING IS TO MATCH EXISTING UNLESS OTHERWISE SHOWN ON PLANS OR DIRECTED BY THE CITY. CONTRACTOR SHALL TIE DOWN LOCATION OF ALL STRIPING PRIOR TO REMOVAL.

3. THE CONTRACTOR SHALL REMOVE EXISTING STRIPING AS NEEDED PRIOR TO PLACEMENT OF OVERLAYS.

4. FOR STREETS WHERE ONLY DIGOUTS ARE BEING PERFORMED, THE CONTRACTOR SHALL REPLACE ANY STRIPING REMOVED THE DIGOUTS IN KIND WIT H PAINT.

5. NOT ALL UTILITIES ARE SHOWN ON PLANS. CONTRACTOR SHALL TIE DOWN EXISTING UTILITIES PRIOR TO OVERLAY, COLD PLANE, FULL DEPTH R ECLAMATION, OR REMOVE AND REPLACE WORK.

6. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (811) AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF OF

CONSTRUCTION TO ALLOW UTILITY OWNER TO MARK THE LOCATION OF THEIR RESPECTIVE UNDERGROUND FACILITIES/UTILITIES, PUBLIC OR PRIVATE, SHOWN OR NOT ON THESE PLANS.

7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS TO COMPLETE WORK.

8. FOR AREAS TO BE REMOVED & REPLACED, THE CONTRACTOR SHALL ONLY REMOVE MATERIAL QUANTITIES THAT CAN BE REPLACED DURING THE SAME WORK DAY.

9. THE CONTRACTOR SHALL CONTACT THE ENGINEER AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF PAVING TO ALLOW THE ENGI NEER TO MARK THE LIMITS OF PAVING AND LOCATIONS OF REMOVE & REPLACE AREAS.

10. CONTRACTOR SHALL DEVELOP AN HMA PAVING PLACEMENT PLAN THAT WILL ENSURE THAT NO LONGITUDINAL JOINTS REMAIN UNFINISHED IN THE SAME DIRECTION BETWEEN WORK SHIFTS DURING FINISH COURSE PLACEMENT.

11. CONTRACTOR SHALL REMOVE ANY EXISTING ASPHALT MATERIAL FROM GUTTER PAN WITHIN PROJECT LIMITS; CONTRACTOR SHALL PROTECT EXISTING PCC FACILITIES.

12. CONTRACTOR SHALL PROTECT VERTICAL EDGES ON LIMITS OF WORK. ANY BROKEN EDGES SHALL BE RE-CUT TO PROVIDE CLEAN STRAIGHT LINE.

13. CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION WASTE IN A LEGAL MANNER.

REMOVE & REPLACE PCC CURB & GUTTER

REMOVE & REPLACE PCC CURB

REMOVE & REPLACE SIDEWALK UNDERDRAIN
1-INCH HMA LEVELING COURSE (SEE PLAN FOR TYPICAL SECTION)

PAVEMENT TRANSITION
REMOVE & REPLACE 4" HMA
REMOVE & REPLACE 6" HMA
REMOVE & REPLACE 8" HMA
STRIPING NOTES:

1. ALL STRIPING AND PAVEMENT MARKING DETAILS AND LAYOUTS SHALL CONFORM TO THE CURRENT STATE OF CALIFORNIA

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS AND THE STATE OF CALIFORNIA STANDARD PLANS, UNLESS OTHERWISE SPECIFIED.

2. LANE DIMENSIONS ARE FROM TOP OF CURB OR EDGE OF PAVEMENT TO CENTER OF STRIPE DETAIL.

3. ALL LONG LINE STRIPING, PAVEMENT MARKINGS/LEGENDS, CROSSWALK, AND LIMIT LINES SHALL BE THERMOPLASTIC EXCEPT ON PCC SURFACES.

4. BLUE TWO-WAY REFLECTIVE PAVEMENT MARKERS SHALL BE INSTALLED IN THE STREETS ADJACENT TO FIRE HYDRANTS IN

ACCORDANCE WITH CITY OF GOLETA STANDARD FOR PLACEMENT OF FIRE HYDRANT MARKERS

INSTALL ROADSIDE SIGN

CRACK SEAL & SLURRY SEAL (TYPE II)
10 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:14 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

TYPICAL SECTIONS
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:

1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.

2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.

3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.

4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.

5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"

0.83'

1.25'
NTS
TYPICAL SECTION NO. 6

0.29'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.

SHOULDER BACKING

PER DETAIL
HMA LIFT THICKNESSES:

1. 0.08' HMA-SP50 (PG 64-10) LEVELING COURSE.

2. 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.

TYPICAL SECTION NO. 9
NTS

0.63'
MEDIAN
WIDTH
(VARIES)

0.63'
HMA LIFT THICKNESSES:

1. PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE.

2. PLACE 0.21' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE.

3. PLACE 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE.

NTS
TYPICAL SECTION NO. 2

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.

TAPER FROM 0.17' TO 0.27' OVER 5'.

NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP

0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE
NOTE:

1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,

PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

NTS
TYPICAL SECTION NO. 8

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.21' HMA-SP50 (PG 64-10) SURFACE COURSE. TAPER
FROM 0.17' TO 0.21' OVER 5'.

NTS
TYPICAL SECTION NO. 4

0.67'0.33'

EB LANE
(VARIES)

WB LANE
(VARIES)
HMA LIFT THICKNESSES:

1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).

2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).

3. 0.16' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).ALTERNATE PAVEMENT EDGE 1

APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE

R&R (SEE PLAN FOR

LOCATION & DEPTH)

R&R (SEE PLAN FOR

LOCATION & DEPTH)

ALTERNATE PAVEMENT EDGE

HMA DIKE,
TYPE A
NTS
TYPICAL SECTION NO. 5

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP65 (PG 64-10) SURFACE COURSE

ALTERNATE PAVEMENT EDGE

SHOULDER BACKING

PER DETAIL

0.19' BELOW

PAVEMENT
EDGE

HMA AGGREGATE
(UNLESS INDICATED OTHERWISE)
REMOVE AND REPLACE AREAS 1/2-INCH TYPE A OR 3/4-INCH* TYPE A LEVELING COURSES 3/8-INCH TYPE A
BASE COURSES 1/2-INCH TYPE A OR 3/4-INCH* TYPE A
INTERMEDIATE COURSES 1/2-INCH TYPE A OR 3/4-INCH* TYPE A SURFACE COURSES 1/2-INCH TYPE A

0.25'
TAPER LEVELING COURSE OVER 5' TO 0' THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)

0.25'
5'

0.25'
*3/4-INCH TYPE A MAY BE USED IF THE LIFT THICKNESS IS GREATER THAN 0.20-FOOT (2.4 INCHES).

0.08'
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

NOTE:

1. SEE PLAN FOR PAVING LIMITS

2. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

R&R (SEE PLAN FOR

LOCATION & DEPTH)
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

PLACE CRACK SEAL & SLURRY

SEAL (TYPE II) IN ALL AREAS
11 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:14 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

DETAILS

PAVEMENT TRANSITION A
NTS
20'
EX. PAVEMENT

SURFACE
TYPICAL SECTION NO. 4 TYPICAL SECTION NO. 5

TAPER HMA SURFACE
COURSE FROM 0.25'
TO 0.19' OVER 20'

MAINTAIN HMA LEVELING
COURSE 0.10'
REMOVE EX. HMA;
TAPER FROM 0.25'
TO 0.29' OVER 20'
25'
EX. CROSS GUTTER
25'
EX. CROSS GUTTER
EX. PAVEMENT SURFACE

0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10)

0.42'

0.33'

0.25' HMA BASE COURSE
HMA-SP50 (PG 64-10)

PAVEMENT TRANSITION C
NTS
EX. PAVEMENT SURFACE

0.17' HMA SURFACE
COURSE
HMA-SP50 (PG 64-10)

0.17' HMA BASE COURSE
HMA-SP50 (PG 64-10)
TYPICAL SECTION NO. 8

TRANSVERSE PAVING LIMIT C
KEYCUT - TYPE B1
TYPICAL SECTION NO. 7

PAVEMENT TRANSITION D
NTS
REMOVE EX. HMA (DEPTH VARIES)
REMOVE EX. HMA (DEPTH VARIES)
PAVEMENT TRANSITION B2
NTS
20'
EX. PAVEMENT
20'
REMOVE EX. HMA
EX. CROSS GUTTER
15'
2"

TAPER HMA SURFACE
COURSE FROM 0.17'
TO 0.27' OVER 15'
EX. PAVEMENT SURFACE

TRANSVERSE PAVING LIMIT B
NTS
REMOVE EX. HMA
TYPICAL SECTION NO. 4 TYPICAL SECTION NO. 6
EX. OR NEW

PAVEMENT
15'

0.17'

TAPER HMA SURFACE
COURSE FROM 0.17'
TO 0.19' OVER 15'
EX. PAVEMENT SURFACE

TRANSVERSE PAVING LIMIT C
NTS
REMOVE EX. HMA
TYPICAL SECTION NO. 8
15'
KEYCUT - TYPE B1
(TRANSVERSE KEYCUT)
NTS
EX. PAVEMENT OR

CROSS GUTTER

0.17' BELOW ADJACENT
FACILITY TO REMAINEX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
KEYCUT - TYPE A1
(LONGITUDINAL KEYCUT)
NTS
5'
EX. CURB
& GUTTER

0.17' BELOW

GUTTER LIP
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
TYPICAL SECTION NO. 6 TYPICAL SECTION NO. 7
REMOVE EX. HMA;
TAPER FROM 0.17'
TO 0' OVER 20'
EX. PAVEMENT

SURFACE

SURFACE COURSE

TAPER SURFACE
COURSE FROM 0.27'
TO 0.17' OVER 20'

0.25'

HMA LEVELING
COURSE 0.10'

TAPER HMA SURFACE
COURSE FROM 0.19'
TO 0.25' OVER 20'
EX. PAVEMENT SURFACE

TRANSVERSE PAVING LIMIT A
NTS
PAVEMENT TRANSITION B1
NTS
20'TYPICAL SECTION NO. 6
REMOVE 0.17' EX. HMA
EX. PAVEMENT

SURFACESURFACE COURSE

TAPER SURFACE
COURSE FROM 0.27'
TO 0.17' OVER 20'
EX. PAVEMENT OR

PAVEMENT EDGE
5'
TYPICAL SECTION NO. 3

TAPER HMA SURFACE COURSE
FROM 0.08' TO 0' OVER 5'
EX. PAVEMENT SURFACE

TRANSVERSE PAVING LIMIT D
NTS
NTS

SHOULDER BACKING DETAIL

SEE SPECIFICATIONS

FOR SHOULDER
BACKING MATERIAL EXIST. SURFACE

NEW HMA

OVERLAY

PLACE SHOULDER BACKING

AFTER COMPLETION OF HMA

SURFACING

4.0'-0"

3.0'-0"

2.0'-0"

1.0'-0"

0.25'-0.33'

0.17'-0.25'

0.08'-0.17'
0'-0.08'
H Y

DIMENSION

SCHEDULE
H
Y
NTS

REMOVE & REPLACE HMA (VARIOUS DEPTHS)
W
(PAVEMENT

REMOVAL)
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN .13' OF MATERIAL, SUBGRADE SHALL BE
RECOMPACTED TO 95% R.C.

2. ALL COURSES SHALL CONSIST OF HMA-SP85 (PG 64-10).

EX, PAVEMENT, GUTTER

LIP OR SPANDREL

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
SEE NOTE 1 Y (INTERMEDIATE COURSE)

0.25'

0.33'

0.42'

0.50'

0.58'

0.67'
0'

0.17'

0.25'

0.25'

0.33'

0.25'
0'
0'
0'
0'
0'

0.25'

0.25'

0.17'

0.17'

0.25'

0.25'

0.17'

X (BASE COURSE)

Z (SURFACE COURSE)

DEPTH MEASUREMENTS
XYZW
12 N KELLOGG AVE

CALLE REAL

SOMERSET DR
DR

HANNAPAREJO
DR
217

NORTH KELLOGG AVENUE
R&R 0.33' HMA
(~6'X120')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~12'X70')
R&R 0.33' HMA
(~15'X41')
R&R 0.33' HMA
(~18'X14') R&R 0.33' HMA
(~6'X9')
R&R 0.33' HMA
(~14'X18') R&R 0.33' HMA
(~6'X8')
R&R 0.33' HMA
(~8'X16')
R&R 0.33' HMA
(~8'X12')
R&R 0.33' HMA
(~12'X15')
10+00 11+00 12+00 13+00 14+00
15+00
PRB
PROTECT EX. BRIDGE IN PLACE
C10
C1
TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 2
TREATMENT LIMIT @

CHANGE OF PAVEMENT
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.

ALTERNATE PAVEMENT EDGE

SHOULDER BACKING

PER DETAIL

0.19' BELOW

PAVEMENT
EDGE
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
10+00 11+00 12+00 13+00 14+00
15+00

NORTH KELLOGG AVENUE
DETAIL 39DETAIL 12 WITH TYPE G MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERS DETAIL 39A WITH GREEN PAINT DETAIL 39
HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT (TYP.)

REPLACE EXISTING

STOP BAR
(2 FT. WIDE) (TYP.)
4' MIN.
11' MIN. 11' MIN.
11' MIN.
11' MIN.
4' MIN.

REPLACE EXISTING SIGNAL AHEAD WORDMARKINGS SPACED ±58' APART AND ± 285'FROM THE INTERSECTION (TYP.) 50'
50'
200'

CALLE REAL - PAVEMENT TREATMENT LIMITS
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 15+50 - SEE SHEET
6 CALLE REAL

NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 15+50 - SEE SHEET
6 BORING LOG
NO. HMA CTB FABRIC (Y/N)
C1 5-1/2" 4 N
C10 6" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CALLE REAL - STRIPING LAYOUT

BASE BID
STA 10+00 TO STA 15+50
13 MARAVILLA
R&R 0.33' HMA
(~12'X14') R&R 0.33' HMA
(~24'X88')
R&R 0.33' HMA
(~18'X37')
R&R 0.33' HMA
(~12'X20')
R&R 0.33' HMA
(~24'X67')
R&R 0.33' HMA
(~12'X36')
R&R 0.33' HMA
(~12'X90')
R&R 0.33' HMA
(~12'X81')
R&R 0.33' HMA
(~12'X60')
R&R 0.33' HMA
(~12'X60') R&R 0.33' HMA
(~12'X18')
R&R 0.33' HMA
(~6'X15')
2 16+00 17+00 18+00 19+00 20+00 21+00 22+
PROTECT EX.

BRIDGE IN PLACE
1 C2
C9
C8
TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 2

N KELLOGG AVE

CALLE REAL

SOMERSET DR
DR

HANNAPAREJO
DR
217
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.

ALTERNATE PAVEMENT EDGE

SHOULDER BACKING

PER DETAIL

0.19' BELOW

PAVEMENT
EDGE
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
16+00 17+00 18+00 19+00 20+00 21+00 22+

TYPE IV (L) ARROW
(TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUE MARKER
DETAIL 39DETAIL 12 WITH TYPE G MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39A WITH GREEN PAINT DETAIL 39
11' MIN. 11' MIN.
4' MIN.
11' MIN. 11' MIN.
4' MIN.
11'
200'
50'
138.5'
DETAIL 39A WITH GREEN PAINT AT BUS STOP
50'

MARAVILLA
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 15+50 - SEE SHEET 5
MATCHLINE STA 22+00 - SEE SHEET 7

CALLE REAL

NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 15+50 - SEE SHEET 5
MATCHLINE STA 22+00 - SEE SHEET 7

BORING LOG
NO. HMA CTB FABRIC (Y/N)
C2 6-1/4" - N
C8 6" - N
C9 5" -N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BASE BID
STA 15+50 TO STA 22+00

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
14 MARAVILLA
R&R 0.33' HMA
(~12'X40')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6') R&R 0.33' HMA
(~6'X25')
R&R 0.33' HMA
(~6'X39')
R&R 0.33' HMA
(~24'X275')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~12'X125')
54 +00 23+00 24+00 25+00 26+00 27+00 28+00
C3
C7
C4
TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 2
3 N KELLOGG AVE

CALLE REAL

SOMERSET DR
DR

HANNAPAREJO
DR
217
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.

ALTERNATE PAVEMENT EDGE

SHOULDER BACKING

PER DETAIL

0.19' BELOW

PAVEMENT
EDGE
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
+00 23+00 24+00 25+00 26+00 27+00 28+00
16°'
DETAIL 39DETAIL 12 WITH TYPE G MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39A WITH GREEN PAINT DETAIL 39

REPLACE EXISTINGLADDER STYLECROSSWALK
REPLACE EXISTINGSTOP BAR(2 FT. WIDE) (TYP.)
11' MIN. 11' MIN.11' MIN.11' MIN. 5' MIN.
5' MIN.
200'
50'
50'

MARAVILLA
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 28+50 - SEE SHEET 8
MATCHLINE STA 22+00 - SEE SHEET 6

CALLE REAL

NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 28+50 - SEE SHEET 8
MATCHLINE STA 22+00 - SEE SHEET 6

BORING LOG
NO. HMA CTB FABRIC (Y/N)
C3 10" - N
C4 10-1/2" - N
C7 5-1/2" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BASE BID
STA 22+00 TO STA 28+50

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
15 SANTA BARABRA COUNTY
FIRE STATION 12
R&R 0.33' HMA
(~12'X125') R&R 0.33' HMA
(~12'X50')
R&R 0.33' HMA
(~16'X128')
R&R 0.33' HMA
(~6'X6')
INSTALL SHOULDER BACKING R&R 0.33' HMA
(~12'X146')
R&R 0.33' HMA
(~27'X25') R&R 0.33' HMA
(~15'X16')
R&R 0.33' HMA
(~12'X88')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~10'X12')
R&R 0.33' HMA
(~24'X120')
7 6
29+00
30+00
31+00
32+00
33+00
C6
C5
TYPICAL SECTION NO. 1

CITY LIMITS

N KELLOGG AVE

CALLE REAL

SOMERSET DR
DR

HANNAPAREJO
DR
217
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.

ALTERNATE PAVEMENT EDGE

SHOULDER BACKING

PER DETAIL

0.19' BELOW

PAVEMENT
EDGE
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
29+00
30+00
31+00
32+00
33+00

SANTA BARABRA COUNTY
FIRE STATION 12
DETAIL 32
DETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39 DETAIL 12 WITH TYPE G MARKERSDETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 38A
20°'

TYPE IV (L) ARROW
(TYP.)
DETAIL 25 WITH TYPE D MARKERS
DETAIL 39A WITH GREEN PAINT
DETAIL 25 WITH TYPE D MARKERS
DETAIL 25 WITH TYPE D MARKERS
HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT (TYP.) 10'
11' MIN. 11' MIN.
11' MIN.11' MIN.
14'
5' MIN.
5' MIN.
100'
±35'
±35'
±97'
193'

CITY LIMITS
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 28+50 - SEE SHEET
7 CALLE REAL

NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 28+50 - SEE SHEET
7 BORING LOG
NO. HMA CTB FABRIC (Y/N)
C5 7" 3-1/2" N
C6 6" 4" N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BASE BID
STA 28+50 TO STA 33+65

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
16 N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD

KINGS WAY

NORTH FAIRVIEW AVENUE
R&R 0.33' HMA
(~18'X40')
TYPICAL SECTION NO. 2
10+00
11+00
12+00
13+00
14+00
15+00
16+
TRANSVERSE PAVING LIMIT B C1
8 9
SEE SHEET 18 FOR WORK ON KINGS WAY
SEE SHEET 53 FOR CURB

RAMP ENLARGEMENT
SEE SHEET 53 FOR CURB

RAMP ENLARGEMENT
NTS
TYPICAL SECTION NO. 2

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.

TAPER FROM 0.17' TO 0.27' OVER 5'.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

KINGS WAY
10+00
11+00
12+00
13+00
14+00
15+00
16+

NORTH FAIRVIEW AVENUE

STOP SYMBOL
(TYP.)

SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTINENTAL STYLE CROSSWALK(TYP.)
DETAIL 27C PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.) DETAIL 27B PARKING LINE (TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUE
MARKER
100'

CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
1' WIDE STANDARD
STOP BAR (TYP.)10'
10' 10' 10'
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 16+00 - SEE SHEET 10 MATCHLINE STA 16+00 - SEE SHEET 10

KEY MAP
NTS

BERKELEY ROAD

NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 5-3/4" 12" 12 Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT

BASE BID
STA 10+00 TO STA 16+00
STRIPING NOTES:

1. CROSSWALK, STOP BAR & STOP SYMBOL ON KINGS WAY
SHALL BE APPLIED WITH PAINT .
17 ALBANY COURT
R&R 0.33' HMA
(~8'X12')
TYPICAL SECTION NO. 2
R&R 0.33' HMA
(~10'X80')
+00
17+00
18+00
19+00
20+00
21+00
C2
11 10
13 12

DANBURY COURT

ALBANY COURT

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 2

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.

TAPER FROM 0.17' TO 0.27' OVER 5'.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
+00
17+00
18+00
19+00
20+00
21+00

DANBURY COURT

ALBANY COURT EXISTING FIRE HYDRANTREPLACE BLUEMARKER

STOP SYMBOL
(TYP.)

CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
1' WIDE STANDARD
STOP BAR (TYP.)
10' 10'
10'
10'
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)

SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 21+75 - SEE SHEET
11 MATCHLINE STA 16+00 - SEE SHEET 9
MATCHLINE STA 21+75 - SEE SHEET
11 MATCHLINE STA 16+00 - SEE SHEET 9

KEY MAP
NTS

BERKELEY ROAD

NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C2 5" 14" -Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BASE BID
STA 16+00 TO STA 21+75

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
STRIPING NOTES:

1. CROSSWALK, STOP BAR & STOP SYMBOL ON DANBURY

COURT & ALBANY COURT WAY SHALL BE APPLIED WITH
PAINT .
18 R&R 0.33' HMA
(~24'X968')
22+00
23+00
24+00
25+00
26+00
27+00
28+
TYPICAL SECTION NO. 2
C3
15 14
1716
WAKEFIELD ROAD ARUNDEL ROADSEE SHEETS 14 & 18 - 20 FOR WORK ON WAKEFIELD ROAD SEE SHEETS 15 & 21 - 23 FOR WORK ON ARUNDEL ROAD

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 2

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.

TAPER FROM 0.17' TO 0.27' OVER 5'.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
22+00
23+00
24+00
25+00
26+00
27+00
28+

WAKEFIELD ROAD ARUNDEL ROAD

EXISTING FIRE HYDRANT

REPLACE BLUEMARKER

STOP SYMBOL
(TYP.)

CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
1' WIDE STANDARD
STOP BAR (TYP.)
10'
10'
10'
10'
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)

SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 28+00 - SEE SHEET 12
MATCHLINE STA 21+75 - SEE SHEET
10 MATCHLINE STA 28+00 - SEE SHEET 12
MATCHLINE STA 21+75 - SEE SHEET
10 KEY MAP
NTS

BERKELEY ROAD

NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C3 5-1/2" 6" 10 Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BASE BID
STA 21+75 TO STA 28+00

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
STRIPING NOTES:

1. CROSSWALK, STOP BAR & STOP SYMBOL ON WAKEFIELD
ROAD & ARUNDEL ROAD SHALL BE APPLIED WITH PAINT .
19 R&R 0.33' HMA
(~24'X968')

R&R PCC C&G
(~43LF)
R&R 0.33' HMA
(~8'X50')
28+00
29+00
30+00
31+00
32+00
33+00

TRANSVERSE PAVING LIMIT B
TYPICAL SECTION NO. 2
18 19
22 20
21 20'
R&R 0.33' HMA
(~12'X36')

SYLVAN DRIVE
PAVEMENT TRANSITION B1
(SEE CONSTRUCTION NOTES)
C4 R&R 0.33' HMA
(~6'X43')

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 2

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.

TAPER FROM 0.17' TO 0.27' OVER 5'.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
28+00
29+00
30+00
31+00
32+00
33+00
DETAIL 27B PARKING LINE (TYP.)
DETAIL 27B PARKING LINE (TYP.)
DETAIL 22

EXISTING FIRE HYDRANT

REPLACE BLUE
MARKER
STOP SYMBOL(TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.) 1' WIDE STANDARD STOP BAR (TYP.)
START DETAIL 22 ATSTATION 28+25
10'
10'
10'
10'

SHARED ROADWAY BICYCLE MARKING
(TYP.)

SYLVAN DRIVE
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 28+00 - SEE SHEET
11 KEY MAP
NTS

BERKELEY ROAD

NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C4 5" 6" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

MATCHLINE STA 28+00 - SEE SHEET
11 CONSTRUCTION NOTES:

1. IF BERKELEY ROAD (SYLVAN DRIVE TO EAST END) IS
INCLUDED IN PROJECT, USE "PAVEMENT TRANSITION B2" AT
PAVING LIMITS AS SEEN ON SHEET 41. OTHERWISE, USE
"PAVEMENT TRANSITION B1".

BASE BID
STA 28+00 TO STA 32+70

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
20 STOW CANYON ROAD

VIA FIORI

VIA FIORI
INSTALL HMA DIKE, TYPE A (TYP.)

REMOVE PCC RAMP
R&R 0.33' HMA
(~21'X55')
R&R 0.33' HMA
(~8'X12')
R&R 0.33' HMA
(~9'X12')
R&R 0.33' HMA
(~9'X28')
R&R 0.33' HMA
(~6'X6')
TYPICAL SECTION NO. 3
20+00
21+00
22+00
23+00
24+00

NORTH FAIRVIEW AVENUE
10+00
11+00
12+00
13+00

TRANSVERSE PAVING LIMIT D

VIA FIORI
TYPICAL SECTION NO. 3
25+00
26+00
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE

R&R (SEE PLAN FOR

LOCATION & DEPTH)

ALTERNATE PAVEMENT EDGE

HMA DIKE,
TYPE A

0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)

0.25'
5'
3"

0.17'
MATCHLINE STA 24+75 - SEE ABOVE RIGHT
MATCHLINE STA 24+75 - SEE BELOW LEFT
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS

BASE BID
STRIPING NOTES:

1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR

SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
21 STOW CANYON ROAD STOW CANYON ROAD

WAKEFIELD ROAD

WAKEFIELD ROAD

TRANSVERSE PAVING LIMIT D
R&R 0.33' HMA
(~12'X30')
R&R 0.33' HMA
(~8'X14')
R&R 0.33' HMA
(~8'X17')
R&R 0.33' HMA
(~6'X31')
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
R
R R
89+0090+0091+00
40+00
41+00
42+00
43+00
44+00
45+00

R&R PCC C&G
(~30LF)

R&R PCC C&G
(~14LF)

R&R PCC C&G
(~17LF)

TRANSVERSE PAVING LIMIT D

TRANSVERSE PAVING LIMIT D
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE

R&R (SEE PLAN FOR

LOCATION & DEPTH)

ALTERNATE PAVEMENT EDGE

HMA DIKE,
TYPE A

0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)

0.25'
5'
3"

0.17'
MATCHLINE STA 45+75 - SEE SHEET
15 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 91+75 - SEE SHEET
20 MATCHLINE STA 88+50 - SEE SHEET
19 BASE BID
22 ARUNDEL ROAD

STOW CANYON ROAD

W CANYO
R&R 0.33' HMA
(~6'X73')
R&R 0.33' HMA
(~6'X15')
TYPICAL SECTION NO. 3
25-30'
25-30'
46+00
47+00
48+00
49+00
50+00
51+00
52+00
11+
109+00110+00111+00

R&R PCC C&G
(~10LF)
R&R 0.33' HMA
(~8'X10') R

TRANSVERSE PAVING LIMIT D

TRANSVERSE PAVING LIMIT D
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE

R&R (SEE PLAN FOR

LOCATION & DEPTH)

ALTERNATE PAVEMENT EDGE

HMA DIKE,
TYPE A

0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)

0.25'
5'
3"

0.17'
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 52+25 - SEE SHEET
16 MATCHLINE STA 45+75 - SEE SHEET
14 MATCHLINE STA 108+75 - SEE SHEET
22 MATCHLINE STA 111+50 - SEE SHEET
23 BASE BID
STRIPING NOTES:

1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR

SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
23 STOW CANYON ROAD

STOW CANYON ROAD

DARA ROAD
TYPICAL SECTION NO. 3
52+00
53+00
54+00
55+00
56+00
57+00
10+00
11+00
20+00
21+00
22+00
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE

R&R (SEE PLAN FOR

LOCATION & DEPTH)

ALTERNATE PAVEMENT EDGE

HMA DIKE,
TYPE A

0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)

0.25'
5'
3"

0.17'
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 57+75 - SEE SHEET
17 MATCHLINE STA 52+25 - SEE SHEET
15 MATCHLINE STA 22+25 - SEE SHEET
24 BASE BID
24 E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA

STOW CANYON ROAD

STOW CANYON ROAD

CAMBRIDGE DRIVE
R&R 0.33' HMA
(~8'X12')
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
58+00
59+00
60+00
61+00
62+00
90+00

TRANSVERSE PAVING LIMIT D

TRANSVERSE PAVING LIMIT D
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE

R&R (SEE PLAN FOR

LOCATION & DEPTH)

ALTERNATE PAVEMENT EDGE

HMA DIKE,
TYPE A

0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)

0.25'
5'
3"

0.17'
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 57+25 - SEE SHEET
16 BASE BID
STRIPING NOTES:

1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR

SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
25 WAKEFIELD ROAD

BERKELEY ROAD
80+00
81+00
82+00
83+00
SEE SHEETS 9 - 12 FOR WORK ON

BERKELEY ROAD (NORTH FAIRVIEW

AVENUE TO SYLVAN DRIVE)

R&R PCC C&G
(~43LF)
R&R 0.33' HMA
(~8'X43')R
SEE SHEET 10 FOR STRIPING

ON WAKEFIELD ROAD AT

BERKELEY ROAD
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA

KINGS WAY

BERKELEY ROAD
SEE SHEETS 9 - 12 FOR WORK ON

BERKELEY ROAD (NORTH FAIRVIEW

AVENUE TO SYLVAN DRIVE)
R&R 0.33' HMA
(~12'X17')
R&R 0.33' HMA
(~10'X40')
R&R 0.33' HMA
(~6'X30')
R
R
R
15+00
50+0051+0052+0053+00

R&R PCC C&G
(~30LF)

R&R PCC C&G
(~17LF)

R&R PCC C&G
(~40LF)
SEE SHEET 9 FOR

STRIPING ON KINGS WAY

AT BERKELEY ROAD
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 83+50 - SEE SHEET
19 BASE BID
26 WAKEFIELD ROAD

CONNOR LANE

MARSTONE LANE
R&R 0.33' HMA
(~6'X15')
R&R 0.33' HMA
(~6'X11')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X45')
84+00
85+00
86+00
87+00
88+00
30+00 31+00
20+00 21+00
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA
MATCHLINE STA 83+50 - SEE SHEET
18 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 88+50 - SEE SHEET 14

BASE BID
27 WAKEFIELD ROAD

AZALEA WAY
R&R 0.33' HMA
(~6'X24')
R&R 0.33' HMA
(~6'X9')
R&R 0.33' HMA
(~13'X60')
92+00
93+00
94+00
10+00
11+00
12+00
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 91+75 - SEE SHEET
14 BASE BID
28 E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICI
O

LA GOLETA RD

ARUNDEL ROAD

BERKELEY ROAD
SEE SHEETS 9 - 12 FOR WORK ON

BERKELEY ROAD (NORTH FAIRVIEW

AVENUE TO SYLVAN DRIVE)
R&R 0.33' HMA
(~12'X21')
26+00
100+00
101+00
102+00
103+00
104+00
105+
SEE SHEET 11 FOR STRIPING

ON ARUNDEL ROAD AT

BERKELEY ROAD
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 105+00 - SEE SHEET 22

BASE BID
29 E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICI
O

LA GOLETA RD

ARUNDEL ROAD

LEEDS LANE

MALEY DRIVE
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X24') R&R 0.33' HMA
(~6'X15')
R&R 0.33' HMA
(~8'X8')
R&R 0.33' HMA
(~12'X12')
5+00
106+00
107+00
108+00
20+00 21+00 22+00
15+00 16+00 17+00
R&R 0.33' HMA
(~10'X21')

R&R PCC C&G
(~21LF)
MATCHLINE STA 105+00 - SEE SHEET 21
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 108+75 - SEE SHEET 15

BASE BID
30 E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA

ARUNDEL ROAD
112+00
113+00
114+00
115+00

ARUNDEL ROAD

CATHEDRAL OAKS ROAD
R&R 0.33' HMA
(~6'X56')
R&R 0.33' HMA
(~8'X16')
R&R 0.33' HMA
(~14'X22')
116+00
117+00
118+00
119+00
MATCHLINE STA 115+50 - SEE ABOVE RIGHT
MATCHLINE STA 111+50 - SEE SHEET 15
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 115+50 - SEE BELOW LEFT

BASE BID
31 E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA

DARA ROAD

ANDAMAR WAY
23+00
24+00
25+00
26+00
27+00
70+00 +00
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3

TRANSVERSE PAVING LIMIT D
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP
NTS NTSMATCHLINE STA 27+75 - SEE SHEET 25
MATCHLINE STA 22+25 - SEE SHEET
16 BASE BID
MATCHLINE STA 71+00 - SEE SHEET 26
32 E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA

ANDAMAR WAY

ANDAMAR WAY

DARA ROAD

CATHEDRAL OAKS ROAD
R&R 0.33' HMA
(~6'X6')
28+00
29+00
30+00
31+00
79+00
80+00
81+00
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3

TRANSVERSE PAVING LIMIT D

TRANSVERSE PAVING LIMIT D

TRANSVERSE PAVING LIMIT D
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS
MATCHLINE STA 27+75 - SEE SHEET 24

BASE BID
STRIPING NOTES:

1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR

SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.

MATCHLINE STA 78+50 - SEE SHEET
26 33
E

SOMERSET DR

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

CATHEDRAL OAKS RD
CAMINO

CAMPANA
LL WAY

STOW CANYON RD
LA

ANDAMAR WAY
AND
Y
71+00 72+00
73+00
74+00
75+00
76+00
77+00
78+00
TYPICAL SECTION NO. 3
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

NORTHEAST GOLETA

NEIGHBORHOOD

KEY MAP

NTS NTS

BASE BID
MATCHLINE STA 71+00 - SEE SHEET
24 MATCHLINE STA 78+50 - SEE SHEET
24 34

HOLLISTER AVENUE

CATHEDRAL OAKS RD

PEBBLE BEACH DR

ELDERBERRY DRLAS ARMAS RD

VIA JERO
11+00
12+00
13+00
14+00
15+00
16+00
C4

CATHEDRAL OAKS ROAD
TREATMENT LIMIT @

CHANGE OF PAVEMENT
11+00
12+00
13+00
14+00
15+00
16+00

CATHEDRAL OAKS ROAD
DETAIL 22DETAIL 38DETAIL 39
DETAIL 27BDETAIL 39DETAIL 39DETAIL 22DETAIL 22DETAIL 39 DETAIL 39A WITH GREEN PAINT
DETAIL 39DETAIL 39
DETAIL 39
DETAIL 22DETAIL 38
TYPE IV (L) ARROW(TYP.)
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT(TYP.) STOP SYMBOL(TYP.)
TYPE IV (R) ARROW(TYP.)
DETAIL 39A WITH GREEN PAINT

HELMETED BICYCLIST SYMBOL
MUTCD FIGURE 9C-3WHITE PAINT (TYP.)

REPLACE BLUE MARKER
5'

11.5' 12.5'
±5.5'
±11'
10'
12'
11'
6'
11'±7.25'

EXISTING FIRE HYDRANT
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS

HOLLISTER AVENUE

CATHEDRAL OAKS ROAD TO

PEBBLE BEACH DRIVE

BORING LOG
NO. HMA PCC FABRIC (Y/N)
C4 11-1/2" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

MATCHLINE STA 16+75 - SEE SHEET
28 BASE BID
STA 10+72 TO STA 16+75

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 16+75 - SEE SHEET
28 35
17+00
18+00
19+00
20+00 21+00
22+00 23+00
C3

WHIMBREL LANE
R&R 0.25' HMA
(~10'X50')
R&R 0.25' HMA
(~10'X557')
C2

WHIMBREL LANE
17+00
18+00
19+00
20+00 21+00
22+00 23+00

WHIMBREL LANE

WHIMBREL LANE
DETAIL 22DETAIL 39
DETAIL 39DETAIL 38 DETAIL 32 DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39DETAIL 24DETAIL 24
L 22 38

REPLACE BLUE MARKER

6.5'
11'11.25'11.25'
7'

5.75'
11'11'

6.5'

EXISTING FIRE HYDRANT

TYPE IV (L) ARROW
(TYP.)
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.)

HOLLISTER AVENUE

CATHEDRAL OAKS RD

PEBBLE BEACH DR

ELDERBERRY DRLAS ARMAS RD

VIA JERO

HOLLISTER AVENUE

CATHEDRAL OAKS ROAD TO

PEBBLE BEACH DRIVE

BASE BID
STA 16+75 TO STA 23+25
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 16+75 - SEE SHEET
27 MATCHLINE STA 23+25 - SEE SHEET 29
MATCHLINE STA 16+75 - SEE SHEET
27 MATCHLINE STA 23+25 - SEE SHEET 29

BORING LOG
NO. HMA PCC FABRIC (Y/N)
C2 9" - Y
C3 11-1/2" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

KEY MAP
NTS
36 24+00
25+00 26+00
27+00
28+00
29+00
C1
R&R 0.25' HMA
(~6'X107')
R&R 0.50' HMA
(~10'X63')
R&R 0.25' HMA
(~10'X557')
10'
16'
R&R 0.25' HMA
(~1,330SF)
R&R 0.25' HMA
(~6'X130')
R&(~

HOLLISTER AVENUE

CATHEDRAL OAKS RD

PEBBLE BEACH DR

ELDERBERRY DRLAS ARMAS RD

VIA JERO
24+00
25+00 26+00
27+00
28+00
29+00
DETAIL 39
DETAIL 39
DE
DETAIL 24DETAIL 24DETAIL 39
D
DETAIL 39DETAIL 39DETAIL 38
D
DETAIL 22
DE
6'
11'11'
±7.25'
11'
6'
11'11'

6.5'

HOLLISTER AVENUE

CATHEDRAL OAKS ROAD TO

ELDERBERRY DRIVE

BASE BID
STA 23+25 TO STA 29+00
MATCHLINE STA 23+25 - SEE SHEET 28
MATCHLINE STA 29+00 - SEE SHEET
30 BORING LOG
NO. HMA PCC FABRIC (Y/N)
C1 9" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 29+00 - SEE SHEET
30 MATCHLINE STA 23+25 - SEE SHEET 28
37 29+00
30+00
31+00
32+00
33+00
34+00
35+00

LAS ARMAS ROAD
C5

ELDERBERRY DRIVE
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.67')
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.33')TREATMENT LIMITS @

CHANGE OF PAVEMENT
R&R 0.25' HMA
(~6'X130')
R&R 0.25' HMA
(~6'X40')
R&R 0.25' HMA
(~6'X193')
R&R 0.25' HMA
(~10'X15')
26'
16'
17'

HOLLISTER AVENUE

CATHEDRAL OAKS RD

PEBBLE BEACH DR

ELDERBERRY DRLAS ARMAS RD

VIA JERO
NTS
TYPICAL SECTION NO. 4

0.67'

EB LANE
(VARIES)

WB LANE
(VARIES)
ALTERNATE PAVEMENT EDGE 1

R&R (SEE PLAN FOR

LOCATION & DEPTH)

0.33'
HMA LIFT THICKNESSES:

1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).

2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).

3. 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).

APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

LAS ARMAS ROAD
L 39
DETAIL 39
DETAIL 39DETAIL 39
38 DETAIL 38
22 DETAIL 22
DETAIL 39A WITH GREEN PAINT
DETAIL 29
DETAIL 39A WITH GREEN PAINTDETAIL 39A WITH GREEN PAINT

REPLACE BLUE MARKER

REPLACE BLUE MARKER

11.5'

11.5'

EXISTING FIRE HYDRANT

EXISTING FIRE HYDRANT
DETAIL 22
DETAIL 39A WITH GREEN PAINTDETAIL 39A WITH GREEN PAINT
DETAIL 39DETAIL 39
DETAIL 38 DETAIL 39DETAIL 39
TYPE IV (L) ARROW(TYP.)
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.) 12' 12' 11.5'

EXISTING FIRE HYDRANT

REPLACE BLUE MARKER
±10'

6.5'
6'

ELDERBERRY DRIVE
6'

6.5'
DETAIL 39A WITH GREEN PAINTDETAIL 39A WITH GREEN PAINT
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 35+50 - SEE SHEET 31
MATCHLINE STA 29+00 - SEE SHEET
29 HOLLISTER AVENUE

CATHEDRAL OAKS ROAD TO

PEBBLE BEACH DRIVE

BORING LOG
NO. HMA PCC FABRIC (Y/N)
C5 11-1/2" 8" Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT

BASE BID
STA 29+00 TO STA 35+50
STRIPING NOTES:

1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR

SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS.

MATCHLINE STA 35+50 - SEE SHEET 31
MATCHLINE STA 29+00 - SEE SHEET
29 38

VIA JERO
36+00
37+00
38+00
39+00
40+00
41+00
42+

ELLWOOD SCHOOL
C7
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.67')
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.33')

TYPICAL SECTION
NO. 4 (COLD PLANE &
REPLACE 0.33')
27 23
2928
26 24
25 17'
17'
15'
R&R 0.67' HMA
(~11'X33')

HOLLISTER AVENUE

CATHEDRAL OAKS RD

PEBBLE BEACH DR

ELDERBERRY DRLAS ARMAS RD

VIA JERO
NTS
TYPICAL SECTION NO. 4

0.67'

EB LANE
(VARIES)

WB LANE
(VARIES)
ALTERNATE PAVEMENT EDGE 1

R&R (SEE PLAN FOR

LOCATION & DEPTH)

0.33'
HMA LIFT THICKNESSES:

1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).

2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).

3. 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).

APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

VIA JERO

ELLWOOD SCHOOL
DETAIL 32
DETAIL 22
DETAIL 39A WITH GREEN PAINTDETAIL 39
DETAIL 38
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 22
DETAIL 39
DETAIL 38
DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39
DETAIL 39
DETAIL 39

TYPE IV (L) ARROW
(TYP.)

HELMETED BICYCLIST SYMBOL
MUTCD FIGURE 9C-3
WHITE AND GREEN PAINT (TYP.)
12'
12'

11.5'
6'
6'
11'

EXISTING FIRE HYDRANT

EXISTING FIRE HYDRANT

CONTINENTAL STYLE
CROSSWALK 2' WIDE
BARS BY 10' LONG
2' WIDE STANDARDSTOP BAR (TYP.)

CONTINENTAL STYLE
CROSSWALK 2' WIDE
BARS BY 12' LONG

CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG

REPLACE BLUE MARKER

REPLACE BLUE MARKER
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 35+50 - SEE SHEET 30
MATCHLINE STA 42+00 - SEE SHEET 32

HOLLISTER AVENUE

CATHEDRAL OAKS ROAD TO

PEBBLE BEACH DRIVE

BORING LOG
NO. HMA PCC FABRIC (Y/N)
C7 11-1/2" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT

BASE BID
STA 35+50 TO STA 42+00
MATCHLINE STA 35+50 - SEE SHEET 30
MATCHLINE STA 42+00 - SEE SHEET 32
39 +00
43+00
44+00
45+00
46+00
47+00

PEBBLE BEACH DRIVE
C6
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.67')
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.33' )
15'

HOLLISTER AVENUE

CATHEDRAL OAKS RD

PEBBLE BEACH DR

ELDERBERRY DRLAS ARMAS RD

VIA JERO
NTS
TYPICAL SECTION NO. 4

0.67'

EB LANE
(VARIES)

WB LANE
(VARIES)
ALTERNATE PAVEMENT EDGE 1

R&R (SEE PLAN FOR

LOCATION & DEPTH)

0.33'
HMA LIFT THICKNESSES:

1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).

2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).

3. 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).

APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

PEBBLE BEACH DRIVE
DETAIL 22
DETAIL 38
DETAIL 39
DETAIL 38DETAIL 22
DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT

TYPE IV (L) ARROW
(TYP.)

HELMETED BICYCLIST SYMBOL
MUTCD FIGURE 9C-3
WHITE AND GREEN PAINT (TYP.)
11'
11'
11'
6' MIN.
5' MIN.
±21.5'
DETAIL 27B WITH DIAGONAL CROSSHATCH MARKINGS 20' O.C.

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 42+00 - SEE SHEET 31

HOLLISTER AVENUE

CATHEDRAL OAKS ROAD TO

PEBBLE BEACH DRIVE

BORING LOG
NO. HMA PCC FABRIC (Y/N)
C6 8" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BASE BID
STA 42+00 TO STA 46+80

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 42+00 - SEE SHEET 31
40 GLEN ANNIE ROAD
97+00
98+00 99+00 100+00 101+00 102+00
103+00

CAMINO REAL MARKETPLACE
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6)'
R&R 0.33' HMA
(~6'X8')

R&R PCC
CURB (~14LF)

HOLLISTER AVENUE

SANTA FELICIA DR

CAMINO REAL

GLEN ANNIE RD

STORKE ROAD

MARKETPLACE
97+00
98+00 99+00 100+00 101+00 102+00
103+00

GLEN ANNIE ROAD

CAMINO REAL MARKETPLACE
DETAIL 40
DETAIL 40
DETAIL 40
DETAIL 39A WITH GREEN PAINT (60')DETAIL 39A WITH GREEN PAINT (60') DETAIL 39A WITH GREEN PAINT (65')
DETAIL 39A WITH GREEN PAINT (65')
DETAIL 39DETAIL 38DETAIL 38DETAIL 38DETAIL 38DETAIL 39DETAIL 38 DETAIL 25 DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90')DETAIL 9 WITH TYPE G MARKERS DETAIL 9 WITH TYPE G MARKERS
DETAIL 39DETAIL 38
DETAIL 25 WITH YELLOW DIAGONAL CROSSHATCHING MARKINGS 20' O.C.

DETAIL 38DETAIL 39
DETAIL 36 WITH CHEVRON PAVEMENT MARKINGS 40' O.C.

DETAIL29
DETAIL29
DETAIL 40DETAIL 40
DETAIL 39A WITH GREEN PAINT (60')
CONTINENTAL STYLECROSSWALK 2' WIDEBARS BY 12' LONG (TYP.) HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.) TYPE IV (L) ARROW(TYP.)

TYPE IV (R) ARROW
(TYP.)
1' WIDE

STANDARD
STOP BAR (TYP.)
11'11'
11' MIN.
11'11'
5' MIN.
7'
11' MIN.
5' MIN.
12'
50' 50'
50' 50'

REPLACE BLUE MARKER

EXISTING FIRE HYDRANT

EXISTING FIRE HYDRANT
11'11'
MATCHLINE STA 103+25 - SEE SHEET 34
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CAMINO REAL MARKETPLACE TO STORKE ROAD).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTSNTS

HOLLISTER AVENUE

CAMINO REAL MARKETPLACE TO

STORKE ROAD

BASE BID
STA 96+97 TO STA 103+25
MATCHLINE STA 103+25 - SEE SHEET 34

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT
41 HOLLISTER AVENUE

SANTA FELICIA DR

CAMINO REAL

GLEN ANNIE RD

STORKE ROAD

MARKETPLACE
104+00 105+00
106+00
107+00
108+00

STORKE ROAD
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X51')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X9')
R&R 0.33' HMA
(~6'X62')
R&R 0.33' HMA
(~6'X6')
104+00 105+00
106+00
107+00
108+00

STORKE ROADSTORKE ROAD
DETAIL 39A WITH GREEN PAINT
(200')
DETAIL 38DETAIL 39DETAIL 25DETAIL 38
DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90') DETAIL 38DETAIL 38DETAIL 38DETAIL 38 DETAIL 39DETAIL 38DETAIL 38 DETAIL 9 WITH TYPE G MARKERSDETAIL 9 WITH TYPE G MARKERSDETAIL 39 HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT (TYP.) TYPE IV (L) ARROW(TYP.)
TYPE IV (R) ARROW(TYP.)
1' WIDE STANDARD STOP BAR (TYP.)
±12.5'11' MIN.
10' MIN.
11' MIN.±10.5'11'11'
7' 5' MIN.

NEW LADDER STYLECROSSWALK
5' MIN.
50' 50'
50'
50'

REPLACE EXISTING

YIELD WORD MARKINGS

CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)

REPLACE BLUE MARKER

EXISTING FIRE HYDRANT
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CAMINO REAL MARKETPLACE TO STORKE ROAD).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTSNTS

STORKE ROAD

CAMINO REAL MARKETPLACE TO

STORKE ROAD
MATCHLINE STA 103+25 - SEE SHEET 33

BASE BID
STA 103+25 TO STA 108+61
SEE SHEETS 37 - 38 FOR

WORK ON STORKE ROAD
MATCHLINE STA 103+25 - SEE SHEET 33

HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS

HOLLISTER AVENUE - STRIPING LAYOUT
42 14+00

MANDARIN DRIVE
R&R 0.33' HMA
(~9'X20')
R&R 0.33' HMA
(~8'X30')
END COLD PLANE & REPLACE @ CHANGE OF PAVEMENT

END COLD PLANE & REPLACE
@ CHANGE OF PAVEMENT
~18'
~35'
11'
11'
~129'
~193'
C1
TYPICAL SECTION NO. 5
TYPICAL SECTION NO. 5

REMOVE, SALVAGE &

REPLACE ROADSIDE SIGN

SOUTH FAIRVIEW AVENUE
50+00
51+00
52+00
53+00

MANDARIN DR

ORANGE AVE

MAGNOLIA AVE

HOLLISTER AVE

CALLE REAL

VEGA DR
NTS
TYPICAL SECTION NO. 5

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP65 (PG 64-10) SURFACE COURSE
NOTE:

1. SEE PLAN FOR PAVING LIMITS

2. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
14+00
14+00
50+00
51+00
52+00
53+00

MANDARIN DRIVE

REPLACE BLUE MARKER
REPLACE 15' RED CURB

ON EACH SIDE OF FIRE HYDRANT
REPLACE 60' RED CURB
REPLACE 30' RED CURB

REPLACE
R1-1

EXISTING FIRE HYDRANT
DETAIL 39DETAIL 39
DETAIL 39
DETAIL 39A
DETAIL 39A
DETAIL 39A
DETAIL 39A
2' WIDE STANDARD STOP BAR (TYP.)
STOP SYMBOL (TYP.)
DETAIL 39A
CHEVRON PAVEMENTMARKING AT EXIT GORE AREACHEVRONS SPACED 12' O.C. ±37'
±34'
±59'
±64'
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3 WHITE
TYPE IV (L) ARROW(TYP.)
5' MIN.

SOUTH FAIRVIEW AVENUESOUTH FAIRVIEW AVENUE
50+00
51+00
52+00
53+00
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_SOUTH FAIRVIEW AVENUE (SOUTH FAIRVIEW AVENUE TO NORTH END).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 53+75 - SEE SHEET 36

SOUTH FAIRVIEW AVENUE

SOUTH FAIRVIEW AVENUE TO NORTH END

KEY MAP
NTS

BORING LOG
NO. HMA FABRIC (Y/N)
C1 6-1/2" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY

FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT

IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).

BASE BID
STA 50+26 TO STA 53+75

SOUTH FAIRVIEW AVENUE - PAVEMENT TREATMENT LIMITS

SOUTH FAIRVIEW AVENUE - STRIPING LAYOUT
MATCHLINE STA 53+75 - SEE SHEET 36
43 END COLD PLANE & REPLACE
@ CHANGE OF PAVEMENT
~193'
~18'
C2
TYPICAL SECTION NO. 5
54+00
55+00
56+00

MANDARIN DR

ORANGE AVE

MAGNOLIA AVE

HOLLISTER AVE

CALLE REAL

VEGA DR
NTS
TYPICAL SECTION NO. 5

0.19'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.19' HMA-SP65 (PG 64-10) SURFACE COURSE
NOTE:

1. SEE PLAN FOR PAVING LIMITS

2. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
54+00
55+00
56+00

REPLACE BLUE MARKER
REPLACE 15' OF RED CURB ONEACH SIDE OF FIRE HYDRANT
REPLACE 30' RED CURB
REPLACE 12' RED CURB

EXISTING FIRE HYDRANT
54+00
55+00
56+00
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_SOUTH FAIRVIEW AVENUE (SOUTH FAIRVIEW AVENUE TO NORTH END).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 53+75 - SEE SHEET 35

SOUTH FAIRVIEW AVENUE

SOUTH FAIRVIEW AVENUE TO NORTH END

KEY MAP
NTS

VIEW AVENUE

BORING LOG
NO. HMA FABRIC (Y/N)
C2 5" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY

FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT

IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).

MATCHLINE STA 53+75 - SEE SHEET 35

SOUTH FAIRVIEW AVENUE - PAVEMENT TREATMENT LIMITS

SOUTH FAIRVIEW AVENUE - STRIPING LAYOUT

BASE BID
STA 53+75 TO STA 56+66
44 BOLLAY DR

SANTA FELICIA DR

HOLLISTER AVE

CORTONA DR

GLEN ANNIE RD

CALLE REAL
© 2023 Microsoft Corporation © 2023 Ma

STORKE PLAZA
R&R 0.50' HMA
(~12'X43')
C3
R&R 0.50' HMA
(~18'X270')
SEE SHEET 55 FOR CURB

RAMP ENLARGEMENT

BOLLAY DRIVE
C6
SEE SHEET 57 FOR CURB

RAMP ENLARGEMENT
SEE SHEET 57 FOR CURB
RAMP ENLARGEMENT SEE SHEET 56 FOR CURB

RAMP ENLARGEMENT
SEE SHEET 56 FOR CURB

RAMP ENLARGEMENT
SEE SHEET 55 FOR CURB

RAMP ENLARGEMENT

PROPOSED MODIFIED MEDIAN
(SEE CONSTRUCTION &
STRIPING NOTE 1)

BUS PAD EXTENDED (SEE
CONSTRUCTION & STRIPING NOTE 1)
48+00
49+00
50+00
51+00
52+

MARKETPLACE
DRIVE
R&R 0.50' HMA
(~6'X205')
R&R 0.50' HMA
(~6'X22')
R&R 0.50' HMA
(~6'X40')R&R 0.50' HMA
(~14'X39')
© 2023 Microsoft Corporation © 2023 Ma
48+00
49+00
50+00
51+00
52+

STORKE PLAZABOLLAY DRIVE

MARKETPLACE
DRIVE
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 40
DETAIL 40
DETAIL 41 YELLOW PAINT
DETAIL 40
DETAIL 39A WITH GREEN PAINT
DETAIL 9 WITH TYPE G MARKERS
DETAIL 38
DETAIL 22
DETAIL 38
DETAIL 9 WITH TYPE G MARKERS
DETAIL 22
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 40
DETAIL 40
DETAIL 40
DETAIL 40

HELMETED BICYCLIST SYMBOL MUTCD
FIGURE 9C-3 WHITE AND GREEN PAINT
(TYP.)
NEW LADDER STYLE CROSSWALK (TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUE MARKER
10'
11'
11'
11'
11'

11.5'
5'
11'
11'
11'±6'
12'
12'

11.25'
±6'±9.25' ±7.5'
50'
50'
±7' 50'
50'
6'
11'
50'
50'DETAIL 9
DETAIL 25
DETAIL 38
DETAIL 38
DETAIL 38
DETAIL 38
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_STORKE ROAD (HOLLISTER AVENUE TO BOLLAY DRIVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 52+00 - SEE SHEET 38

STORKE ROAD

HOLLISTER AVENUE TO BOLLAY DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C3 12" -- Y
C6 11" -- Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CONSTRUCTION & STRIPING NOTES:

1. SEE STORKE ROAD / HOLLISTER AVE. TRANSIT, BIKE / PED, AND

MEDIAN IMPROVEMENTS PLANS FOR WORK ON BUS PAD

EXTENSION, RIGHT TURN EXTENSION, BUS STOP REMOVAL, CURB & GUTTER, AND MODIFIED MEDIAN.

2. PERFORM DIGOUTS IN CONJUNCTION WITH STORKE ROAD /
HOLLISTER AVE. TRANSIT, BIKE / PED, AND MEDIAN IMPROVEMENTS.

CONTRACTOR SHALL PHASE & COORDINATE ALL WORK
APPROPRIATELY TO COMPLETE WORK AS SHOWN PER PLANS.

BID ALTERNATE 1
STA 48+33 TO STA 52+00

STORKE ROAD - PAVEMENT TREATMENT LIMITS

STORKE ROAD - STRIPING LAYOUT
MATCHLINE STA 52+00 - SEE SHEET 38
45 BOLLAY DR

SANTA FELICIA DR

HOLLISTER AVE

CORTONA DR

GLEN ANNIE RD

CALLE REAL
© 2023 Microsoft Corporat
R&R 0.50' HMA
(~6'X79')
R&R 0.50' HMA
(~22'X180')
R&R 0.50' HMA
(~6'X255') R&R 0.50' HMA
(~10'X82')
R&R 0.50' HMA
(~6'X24')
C1
C2
C4
C5

HOLLISTER AVENUE
SEE SHEET 54 FOR CURB RAMP &

PEDESTRIAN ISLAND ENLARGEMENT
SEE SHEET 54 FOR CURB

RAMP ENLARGEMENT
EX. MEDIAN

PROPOSED MODIFIED MEDIAN
(SEE CONSTRUCTION &
STRIPING NOTE 1)

RIGHT-TURN EXTENDED
(SEE CONSTRUCTION &
STRIPING NOTE 1)

PROPOSED CURB & GUTTER (SEE
CONSTRUCTION & STRIPING NOTE 1)

BUS STOP REMOVED
(SEE CONSTRUCTION
& STRIPING NOTE 1)

PROPOSED CURB & GUTTER
(SEE CONSTRUCTION &
STRIPING NOTE 1)
+00
53+00
54+00
55+00
56+00
R&R 0.50' HMA
(~8'X42')
R&R 0.50' HMA
(~18'X34')
R&R 0.50' HMA
(~6'X23')
R&R 0.50' HMA
(~6'X82')
R&R 0.50' HMA
(~6'X10')
R&R 0.50' HMA
(~20'X20')
R&R 0.50' HMA
(~6'X82')
REMOVE EX. TRAFFIC LOOP
REMOVE EX. WIRELESS TRAFFIC SENSOR
REMOVE EX. WIRELESS

TRAFFIC SENSOR
© 2023 Microsoft Corporat
+00
53+00
54+00
55+00
56+00

HOLLISTER AVENUE
DETAIL 9 WITH TYPE G MARKERS
DETAIL 38
DETAIL 9 WITH TYPE G MARKERS
DETAIL 39
DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 38
DETAIL 38
DETAIL 38

TYPE IV (L) ARROW
(TYP.)

TYPE IV (R) ARROW
(TYP.)

CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)

HELMETED BICYCLIST SYMBOL MUTCD
FIGURE 9C-3 WHITE AND GREEN PAINT
(TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUE MARKER
±11.5'
11'
DETAIL
22 11'
11'
11'
±6'
11'
11' MIN.
50'
50'
DETAIL 39
DETAIL 38A
DETAIL 38
2' WIDE CROSSWALK BAR
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_STORKE ROAD (HOLLISTER AVENUE TO BOLLAY DRIVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS

STORKE ROAD

HOLLISTER AVENUE TO BOLLAY DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 9" 12" -Y
C2 10-1/2" 2" 71 Y
C4 7-1/4" 13" -Y
C5 12" -- Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

MATCHLINE STA 52+00 - SEE SHEET 37
BID ALTERNATE 1
STA 52+00 TO STA 56+08
CONSTRUCTION & STRIPING NOTES:

1. SEE STORKE ROAD / HOLLISTER AVE. TRANSIT, BIKE / PED, AND

MEDIAN IMPROVEMENTS PLANS FOR WORK ON BUS PAD

EXTENSION, RIGHT TURN EXTENSION, BUS STOP REMOVAL, CURB & GUTTER, AND MODIFIED MEDIAN.

2. PERFORM DIGOUTS IN CONJUNCTION WITH STORKE ROAD /
HOLLISTER AVE. TRANSIT, BIKE / PED, AND MEDIAN IMPROVEMENTS.

CONTRACTOR SHALL PHASE & COORDINATE ALL WORK
APPROPRIATELY TO COMPLETE WORK AS SHOWN PER PLANS.

STORKE ROAD - PAVEMENT TREATMENT LIMITS

STORKE ROAD - STRIPING LAYOUT
SEE SHEET 33 FOR WORK

ON HOLLISTER AVENUE
MATCHLINE STA 52+00 - SEE SHEET 37
46 DEL NORTE DR MENDOCINO DR

SAN MATEO AVE

GLEN ANNIE RD

MADERA DR

COLUSADR

CALAVERAS AVE
C2
50+00
51+00
52+00
53+00
54+00
55+00

CALAVERAS AVENUE

PLUMAS AVENUE

INSTALL SHOULDER BACKING
PROTECT EX. OVERSIDE DRAIN IN PLACE
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X75')
R&R 0.33' HMA
(~12'X42')
R&R 0.33' HMA
(~6'X15')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6')
TYPICAL SECTION NO. 6
30 31
32 33
TREATMENT LIMIT @

CHANGE OF PAVEMENT
C2
NTS
TYPICAL SECTION NO. 6

0.29'

R&R (SEE PLAN FOR

LOCATION & DEPTH)

SHOULDER BACKING

PER DETAIL
HMA LIFT THICKNESSES:

1. 0.08' HMA-SP50 (PG 64-10) LEVELING COURSE.

2. 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
50+00
51+00
52+00
53+00
54+00
55+00

CALAVERAS AVENUE

PLUMAS AVENUE
DETAIL 22DETAIL 39DETAIL 39A WITH GREEN PAINT
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
10'10'
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE PAINT (TYP.)

REPLACE BLUEMARKER

EXISTING FIRE HYDRANT
7' 7'
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.) CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (SONOMA AVE TO CALAVERAS AVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 55+50 - SEE SHEET
40 CALLE REAL

CALAVERAS AVENUE TO SONOMA AVENUE
MATCHLINE STA 55+50 - SEE SHEET
40 BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C2 8" 8" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 2
STA 50+00 TO STA 55+50
47 56+00
57+00
58+00
59+00
60+00
61+00
62+00

SAN MATEO AVENUE

MENDOCINO AVENUE

SONOMA AVENUE
PROTECT EX. OVERSIDE DRAIN IN PLACE

INSTALL SHOULDER BACKING
R&R 0.33' HMA
(~6'X138')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X10')
R&R 0.33' HMA
(~6'X154')
R&R 0.33' HMA
(~6'X20')
TYPICAL SECTION NO. 6
34 36 3735
C1
TREATMENT LIMIT @

CHANGE OF PAVEMENT

DEL NORTE DR MENDOCINO DR

SAN MATEO AVE

GLEN ANNIE RD

MADERA DR

COLUSADR

CALAVERAS AVE
NTS
TYPICAL SECTION NO. 6

0.29'

R&R (SEE PLAN FOR

LOCATION & DEPTH)

SHOULDER BACKING

PER DETAIL
HMA LIFT THICKNESSES:

1. 0.08' HMA-SP50 (PG 64-10) LEVELING COURSE.

2. 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
56+00
57+00
58+00
59+00
60+00
61+00
62+00

SAN MATEO AVENUE

MENDOCINO AVENUE

SONOMA AVENUE
DETAIL 22DETAIL 39DETAIL 39A WITH GREEN PAINT

EXISTING
R26 (CA)
NEW
R81 (CA)

EXISTING
R26 (CA)
R81 (CA) EXISTING
R26 (CA)
R81 (CA)
NEW
R26 (CA)
R81 (CA)
NEWR26 (CA)R81 (CA)
NEW
R26 (CA)
R81 (CA)
NEWR26 (CA)R81 (CA)
10'
10'

REPLACE BLUE
MARKER

EXISTING FIRE HYDRANT
7'7'
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (SONOMA AVE TO CALAVERAS AVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 55+50 - SEE SHEET
39 KEY MAP
NTS

CALLE REAL

CALAVERAS AVENUE TO SONOMA AVENUE
MATCHLINE STA 55+50 - SEE SHEET
39 BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 6" 6" 10 N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 2
STA 55+50 TO STA 61+47
48 32+00
33+00
34+00
35+00
36+00 37+00 38+00
PAVEMENT TRANSITION B2
R&R 0.33' HMA
(~8'X40')
R&R 0.33' HMA
(~6'X6')

R&R PCC C&G
(~20LF) R&R PCC C&G
(~50LF)
R&R 0.33' HMA
(~6'X25')

R&R PCC C&G
(~20LF) R&R 0.33' HMA
(~6'X45')
KEYCUT A1 (TYP.)
KEYCUT B1 (TYP.)
R&R 0.33' HMA
(~8'X80')
R&R 0.33' HMA
(~8'X20')
R&R 0.33' HMA
(~20'X35')
TYPICAL SECTION NO. 7 R&R 0.33' HMA
(~6'X120')
R&R 0.33' HMA
(~6'X20')
R&R 0.33' HMA
(~8'X131')
R&R 0.33' HMA
(~6'X15')

R&R PCC C&G
(~15LF)
C5
C6
39 38

R&R PCC C&G
(~40LF)

R&R PCC C&G
(~20LF)
R&R 0.33' HMA
(~6'X70')

SYLVAN DRIVE

R&R PCC C&G
(~20LF)

LEXINGTON AVENUE

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP

0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE
NOTE:

1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,

PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

R&R (SEE PLAN FOR

LOCATION & DEPTH)
32+00
33+00
34+00
35+00
36+00 37+00 38+00

LEXINGTON AVENUE
DETAIL 27B PARKING LINE (TYP.)DETAIL 22 DETAIL 27B PARKING LINE (TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUE
MARKER

REPLACE BLUEMARKER
STOP SYMBOL(TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.)1' WIDE STANDARDSTOP BAR (TYP.)

SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 38+75 - SEE SHEET 42

KEY MAP
NTS

BERKELEY ROAD

SYLVAN DRIVE TO EAST END

BORING LOG
NO. HMA FABRIC (Y/N)
C5 3-1/2" N
C6 4" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY

FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT

IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 38+75 - SEE SHEET 42
SEE SHEETS 9 - 12 FOR WORK ON

BERKELEY ROAD (NORTH FAIRVIEWAVENUE TO SYLVAN DRIVE)
BID ALTERNATE 3
STA 32+50 TO STA 38+75
49 39+00 40+00 41+00 42+00 43+00 44+00
R&R 0.33' HMA
(~6'X170')
R&R 0.33' HMA
(~6'X20')
R&R 0.33' HMA
(~8'X45')
R&R 0.33' HMA
(~6'X170')
R&R 0.33' HMA
(~18'X33')
R&R 0.33' HMA
(~14'X35')
R&R 0.33' HMA
(~8'X13')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X10')
R&R 0.33' HMA
(~10'X108')
R&R 0.33' HMA
(~6'X170')
R&R 0.33' HMA
(~6'X15')KEYCUT A1 (TYP.)
C7
4240
43 41
25'

PAVEMENT TRANSITION C

R&R PCC C&G
(~31LF)
KEYCUT B1 (TYP.)

R&R PCC C&G
(~8LF)
R&R 0.33' HMA
(~8'X24')

R&R PCC C&G
(~15LF)

CAMBRIDGE DRIVE

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP

0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE
NOTE:

1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,

PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

R&R (SEE PLAN FOR

LOCATION & DEPTH)
39+00 40+00 41+00 42+00 43+00 44+00

CAMBRIDGE DRIVE
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUE
MARKER
STOP SYMBOL(TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.)1' WIDE STANDARDSTOP BAR (TYP.) 10'
10'
10' 10'

SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 44+25 - SEE SHEET 43
MATCHLINE STA 38+75 - SEE SHEET 41

KEY MAP
NTS

BERKELEY ROAD

SYLVAN DRIVE TO EAST END

BORING LOG
NO. HMA FABRIC (Y/N)
C7 3-1/2" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY

FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT

IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 44+25 - SEE SHEET 43
MATCHLINE STA 38+75 - SEE SHEET 41
BID ALTERNATE 3
STA 38+75 TO STA 44+25
50 PRINCETON AVENUE
45+00 46+00 47+00 48+00 49+00
50+00
R&R 0.33' HMA
(~10'X12')
R&R 0.33' HMA
(~6'X70')
R&R 0.33' HMA
(~6'X90')
TYPICAL SECTION NO. 7
R&R 0.25' HMA
(~12'X200')
R&R 0.25' HMA
(~8'X8')

TRANSVERSE PAVING LIMIT C
C8
47 45
44 46
48 49
25' 25'

PAVEMENT TRANSITION D

PAVEMENT

TRANSITION C

R&R PCC C&G
(~46LF)REMOVE & REPLACE

SIDEWALK UNDERDRAIN

R&R PCC C&G
(~13LF)

TRANSVERSE PAVING LIMIT C
(~6'X6')
R&R 0.33' HMA
(~6'X170')
TYPICAL SECTION NO. 8

R&R PCC C&G
(~8LF)

NORTH KELLOGG AVENUE

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP

0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT

SURFACE
NOTE:

1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,

PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

R&R (SEE PLAN FOR

LOCATION & DEPTH)
NTS
TYPICAL SECTION NO. 8

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.21' HMA-SP50 (PG 64-10) SURFACE COURSE. TAPER
FROM 0.17' TO 0.21' OVER 5'.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
45+00 46+00 47+00 48+00 49+00
50+00

NORTH KELLOGG AVENUE

CONTINENTAL STYLE CROSSWALK

EXISTING FIRE HYDRANT

REPLACE BLUEMARKER
STOP SYMBOL (TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.)1' WIDE STANDARDSTOP BAR (TYP.) 10' 10' 10'
10'
10'
10' 10' 10'
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)

PRINCETON AVENUE
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 50+75 - SEE SHEET
44 MATCHLINE STA 44+25 - SEE SHEET 42

KEY MAP
NTS

BERKELEY ROAD

SYLVAN DRIVE TO EAST END

BORING LOG
NO. HMA FABRIC (Y/N)
C8 5" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY

FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT

IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 50+75 - SEE SHEET
44 MATCHLINE STA 44+25 - SEE SHEET 42
BID ALTERNATE 3
STA 44+25 TO STA 50+75
51 SAN JOSE CREEK / CITY LIMITS

X X X X X X X X
51+00 52+00 53+00 54+00 55+00
R&R 0.25' HMA
(~6'X10')
TYPICAL SECTION NO. 8
R&R 0.25' HMA
(~12'X100')
R&R 0.25' HMA
(~6'X6')
R&R 0.25' HMA
(~6'X8')
TYPICAL SECTION NO. 8
PROTECT EX. FENCE IN PLACER
R

RR&R PCC C&G
(~8LF)

R&R PCC C&G
(~40LF) R&R PCC C&G
(~30LF)
R&R 0.25' HMA
(~6'X11') R
R&R 0.25' HMA
(~6'X10')R

R&R PCC C&G
(~30LF)
PROTECT EX. MAILBOX IN PLACE
C9
R&R 0.25' HMA
(~12'X200')

N KELLOGG AVE

SOMERSET DR
DR

HANNAPAREJO
DR
217

CAMBRIDGE DR

ARUNDEL RD

WAKEFIELD DR

N FAIRVIEW AVE

ENCINA RD

CALLE REAL

CATHEDRAL OAKS RD

KINGSTON AVE

ARMITOS AVE

MANDARIN DR

ALONDRA DR
CAMINO

CAMPANA

BERKELEY RD

SHIRRELL WAY

STOW CANYON RDVIA SALERNO

SAN PATRICIO DR

LA GOLETA RD
NTS
TYPICAL SECTION NO. 8

0.17' BELOW

GUTTER LIP

0.17' BELOW

GUTTER LIP
5'5'

0.17'

R&R (SEE PLAN FOR

LOCATION & DEPTH)
HMA LIFT THICKNESS:

1. 0.21' HMA-SP50 (PG 64-10) SURFACE COURSE. TAPER
FROM 0.17' TO 0.21' OVER 5'.

NOTE:

1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO

THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.

SAN JOSE CREEK / CITY LIMITS
51+00 52+00 53+00 54+00 55+00

X X X X X X X X
10'
10'
10'
10'
DETAIL 27B PARKING LINE (TYP.)
DETAIL 27B PARKING LINE (TYP.)

SHARED ROADWAY BICYCLE MARKING
(TYP.)

SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 50+75 - SEE SHEET 43

KEY MAP
NTS

BERKELEY ROAD

SYLVAN DRIVE TO EAST END

BORING LOG
NO. HMA FABRIC (Y/N)
C8 5" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY

FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT

IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).

BERKELEY ROAD - PAVEMENT TREATMENT LIMITS

BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 50+75 - SEE SHEET 43
BID ALTERNATE 3
STA 50+75 TO STA 55+08
52 C1
C2
C3
C4
TYPICAL SECTION NO. 9

HOLLISTER AVENUE

CASTILIAN DRIVE
33+00
34+00
35+00
36+00
37+00
TREATMENT LIMIT @

CHANGE OF PAVEMENT
TREATMENT LIMIT @

CHANGE OF PAVEMENT
50 MESA RD

HOLLISTER AVE

LOS CARNEROS RD

CREMONA DR

CASTILLIAN DR
TYPICAL SECTION NO. 9
NTS

0.63'
MEDIAN
WIDTH
(VARIES)

0.63'
HMA LIFT THICKNESSES:

1. PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE.

2. PLACE 0.21' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE.

3. PLACE 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE.
33+00
34+00
35+00
36+00
37+00

TYPE IV (L) ARROW
(TYP.)

EXISTING FIRE HYDRANT

REPLACE BLUEMARKER

REPLACE BLUE
MARKER

EXISTING FIRE HYDRANT
NEW LADDER STYLECROSSWALK (TYP.)
DETAIL 38ADETAIL 12 WITH TYPE G MARKERSDETAIL 38ADETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39 HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT(TYP.) DETAIL 39A WITH GREEN PAINT
DETAIL 39
DETAIL 38A
DETAIL 36
11' 11'
10'

3.5'
9'
8'
12'
12'
12' 12'
±8'
12'
11'
11'
±8'90'
50' 50'
±100'
200'
50'
225'
50'

76.5'
140'
12'
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_LOS CARNEROS ROAD (HOLLISTER AVENUE TO CASTILIAN DRIVE).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTSNTS

LOS CARNEROS ROAD

HOLLISTER AVENUE TO CASTILIAN DRIVE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 5" 7" 12 N
C2 4" 10" - N
C3 5" 9" - N
C4 4-3/4" 11" -N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

LOS CARNEROS ROAD - PAVEMENT TREATMENT LIMITS

LOS CARNEROS ROAD - STRIPING LAYOUT
CONSTRUCTION NOTES:

1. CONTRACTOR SHALL ONLY REMOVE MATERIAL QUANTITIES THAT CAN BE REPLACED WITH HMA UP TO 2 INCHES BELOW THE FINISH

GRADE DURING THE SAME WORK DAY UNLESS DIRECTED BY THE
CITY.

2. CONTRACTOR SHALL PLACE ENTIRE SURFACE COURSE WITHIN THE SAME WORK DAY UNLESS DIRECTED BY THE CITY.

BID ALTERNATE 4
STA 32+93 TO STA 35+86
53 SALISBURY AVENUE LANCASTER PLACE

BRADFORD DRIVESAINT GEORGE PLACE
C1
51 52
53 54 55
56 57
58 59
TYPICAL SECTION NO. 10
25'
25'
TREATMENT LIMIT @

CHANGE OF PAVEMENT
11+00
12+00 13+00 14+00 15+00 16+00 17+

CALLE REAL

DARTMOOR AVE

HEMPSTEAD AVE

LANCASTER PL

SALISBURY AVE

BRADFORD DR
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:

1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.

2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.

3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.

4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.

5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"

0.83'

1.25'

LANCASTER PLACE

BRADFORD DRIVESAINT GEORGE PLACE
RED CURB±125'
LADDER STYLE CROSSWALK(TYP.)
YIELD LINE(TYP.)
RED CURB ±16
EXISTINGR1-5
EXISTINGR1-5
STOP SYMBOL(TYP.)
DETAIL 27B
DETAIL 39 (TYP.)
DETAIL 39 (TYP.)
DETAIL 41 (TYP.)
DETAIL 39A (TYP.)DETAIL 39A (TYP.)DETAIL 22 (TYP.)
RED CURB ±170'
6'
10'10'
6'
8'
±8'
10'
RED CURB ±25'
RED CURB ±146'
RED CURB ±70'
RED CURB ±40'
STOP SYMBOL(TYP.)
±91'
±16
±71'
±146'

EXISTING FIRE HYDRANT

REPLACE BLUE
MARKER

REPLACE BLUE
MARKER

EXISTING FIREHYDRANT

SALISBURY AVENUE
11+00
12+00 13+00 14+00 15+00 16+00 17+
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (ROCHESTER WAY TO SALISBURY AVENUE).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 17+00 - SEE SHEET 47

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL

ROCHESTER WAY TO SALISBURY AVENUE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 4" 10" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 5
STA 10+81 TO STA 17+00
MATCHLINE STA 17+00 - SEE SHEET 47
54 SAINT IVES PLACE SAINT ALBANS PLACE DARTMOOR AVENUE

SAINT CHARLES PLACE SAINT CHARLES PLACE
C2
C3
60 61
62 63
6564
66 68
67 TYPICAL SECTION NO. 10
+00 18+00 19+00 20+00 21+00 22+00 23+00

CALLE REAL

DARTMOOR AVE

HEMPSTEAD AVE

LANCASTER PL

SALISBURY AVE

BRADFORD DR
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:

1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.

2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.

3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.

4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.

5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"

0.83'

1.25'

SAINT IVES PLACE SAINT ALBANS PLACE DARTMOOR AVENUE

SAINT CHARLES PLACE SAINT CHARLES PLACE
RELOCATER1-5
RELOCATER1-5
DETAIL 29
DETAIL 29
DETAIL 39A (TYP.)DETAIL 39A (TYP.)
DETAIL 22 (TYP.)
DETAIL 39 (TYP.)DETAIL 39 (TYP.)
DETAIL 41 (TYP.)
LADDER STYLECROSSWALK(TYP.)

YIELD LINE
(TYP.)

STOP SYMBOL
(TYP.)
RED CURB ±57
RED CURB ±97'
RED CURB ±101'
RED CURB ±17'
RED CURB ±70'
RED CURB ±61'
RED CURB ±34'
RED CURB ±65'
RED CURB ±35'
RED CURB ±29'
RED CURB ±30'
RED CURB ±11'
8'6'
10'
6'
7'
10'
8'
±67'
STOP SYMBOL(TYP.)
±70'
7'
+00 18+00 19+00 20+00 21+00 22+00 23+00
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (ROCHESTER WAY TO SALISBURY AVENUE).DWG Plot Date: 1/23/2025 3:20 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 17+00 - SEE SHEET 46
MATCHLINE STA 23+50 - SEE SHEET 47

CALLE REAL

ROCHESTER WAY TO SALISBURY AVENUE

BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C2 3-1/4" 10" 11 N
C3 3 10" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 5
STA 17+00 TO STA 23+50
MATCHLINE STA 17+00 - SEE SHEET 46
MATCHLINE STA 23+50 - SEE SHEET 47
55 © 2023 Microsoft Corporation ©
2 ROCHESTER AVENUE
79'
TREATMENT LIMIT @

CHANGE OF PAVEMENT
24+00 25+00 26+00
27+00

HEMPSTEAD AVENUE

CALLE REAL

DARTMOOR AVE

HEMPSTEAD AVE

LANCASTER PL

SALISBURY AVE

BRADFORD DR
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:

1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.

2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.

3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.

4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.

5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"

0.83'

1.25'
© 2023 Microsoft Corporation ©
2 ROCHESTER AVENUE
6'
10'
6'
RED CURB ±65'
RED CURB ±170'
10'
100'
±72'
24+00 25+00 26+00
27+00

HEMPSTEAD AVENUE
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (ROCHESTER WAY TO SALISBURY AVENUE).DWG Plot Date: 1/23/2025 3:20 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)

KEY MAP
NTS
MATCHLINE STA 23+50 - SEE SHEET 47

CALLE REAL

ROCHESTER WAY TO SALISBURY AVENUE

CALLE REAL - PAVEMENT TREATMENT LIMITS

CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 5
STA 23+50 TO STA 27+19
MATCHLINE STA 23+50 - SEE SHEET 47
56 CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/24/2025 1:14 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

CURB RAMP SUMMARY TABLE

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/24/2025 1:14 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

CURB RAMP SUMMARY TABLE

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/24/2025 1:14 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

CURB RAMP SUMMARY TABLE

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:20 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

CURB RAMP PAY ITEMS

CASE A CURB RAMP W/ CURB & GUTTER CASE B CURB RAMP W/ CURB & GUTTER

CASE C CURB RAMP W/ CURB & GUTTER
LEGEND

PCC RETAINING CURB

PCC CURB & GUTTER

PCC CURB RAMP & SIDEWALK

CASE A CURB RAMP W/ SPANDREL & CROSS GUTTER CASE B CURB RAMP W/ SPANDREL & CROSS GUTTER CASE C CURB RAMP W/ SPANDREL & CROSS GUTTER

HMA CONFORM

PCC CROSS GUTTER

PCC SPANDREL

DETECTABLE WARNING SURFACE
NOTE

THESE DIAGRAMS ARE FOR REFERENCING GENERAL PAY ITEMS FOR THE

DIFFERENT CURB RAMP COMPONENTS ONLY AND SHOULD NOT BE USED AS A BASIS FOR THEIR LAYOUTS. PLEASE REFER TO THE APPROPRIATE

PLAN SHEETS, STANDARD DRAWINGS AND DETAILS, SPECIFICATIONS, AND ENGINEER FOR CONSTRUCTION GUIDANCE.

60 20.7'

NORTH FAIRVIEW AVENUE

6.5'
6'
8'

6.8'5'

4.5'
5'
6'
7'

5.8'
4'-2"

5.6'
4'-2"
6'
6'
4'
4'
6'
6'

8.7'
4'-2"

5.6'

3.7'
10'

10.2'
71 1
1 1
2 5

8.3'
3' 3' 5' 4'

BERKELEY ROAD

21.1' 19.6' 19.2' 16.4' 13.6'8.5'20.7'
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,

0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER

LIP OR SPANDREL
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN

0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

POWER POLE

PORTLAND CEMENT CONCRETE IMPROVEMENTS

INSTALL DETECTABLE WARNING SURFACE
LEGEND

FL FLOW LINE

DESIGN ELEVATION

TP TOP OF PAVEMENT

TC TOP OF CURB

SW SIDEWALK

WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)

MANHOLE COVER
ROADSIDE SIGN (EX.)

RIGHT-OF-WAY LINE

SURVEY NAIL

EP EDGE OF PAVEMENT

PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.

LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)

GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:

1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.

2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.

WATER METER COVER

VAULT COVER (EX)
LEGEND

REMOVE & REPLACE/ CONSTRUCT PCC CURB

HIGH POINTHP
& LANDSCAPE RESTORATION
R/W

BACKFILL W/ NATIVE SOIL, REGRADE,
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 01.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
NORTH FAIRVIEW AVENUE @ BERKELEY ROAD

ENLARGEMENT

CURB RAMPS
ENLARGEMENT NOTES:

PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.

REMOVE & REPLACE PCC SPANDREL AND CROSS GUTTER PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.

LOWER UTILITY PRIOR TO COLD PLANE.

PROTECT-IN-PLACE EXISTING RETAINING WALL.
1 2
5 7
NORTH FAIRVIEW AVENUE @

BERKELEY ROAD
61 5' 3'

6.7' 6'

3.7'

4.8'
C2
C3
C4
C1
N89°55'58"E

21.11'
S01°0119'19"W

19.19'

2.5'
17'
4'-2"

11.2'

5.8'
7'
8'
5'
2' MIN.
2' MIN.
6'
2' MIN.

HOLLISTER AVENUE
1003

47.48 SPINDLE

STORKE ROAD
8 8
1 8
6' 7.3'
R/W
R/W
2'
5 C5

3.7'
203

47.79 TAG LS6098

9.3'
3'
DH

9.3'
3'
9'

7.7'

5.2'

7.5'
4'

4.5'
2' MIN.
2' MIN.
8'
5'
13 1
1 301

48.60 CP MAG NAIL

STORKE ROAD
R/W
R/W

2.7'

HOLLISTER AVENUE
18 4'
4'
4'
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,

0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER

LIP OR SPANDREL
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN

0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 03.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
STORKE ROAD @ HOLLISTER AVENUE

ENLARGEMENT

POWER POLEPORTLAND CEMENT CONCRETE IMPROVEMENTS

INSTALL DETECTABLE WARNING SURFACE
LEGEND

FL FLOW LINE

DESIGN ELEVATION

TP TOP OF PAVEMENT

TC TOP OF CURB

SW SIDEWALK

WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)

MANHOLE COVER
ROADSIDE SIGN (EX.)

RIGHT-OF-WAY LINE

SURVEY NAIL

EP EDGE OF PAVEMENT

PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.

LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)

GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)

WATER METER COVER

VAULT COVER (EX)
LEGEND

REMOVE & REPLACE/CONSTRUCT PCC CURB

CURVE TABLE
CURVE # LENGTH RADIUS DELTA
C1 2.61 1.00 149.3489
C2 29.41 68.00 24.7805
C3 2.51 1.00 144.0424
C4 3.19 2.00 91.3892
C5 2.83 5.00 32.42222

CURB RAMPS
NOTES:

1. SEE SHEET XX FOR CURB RAMPS & CONSTRUCTION NOTES FOR CURB RAMPS.

2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.

HP HIGH POINT
ENLARGEMENT NOTES:

PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.

LOWER UTILITY PRIOR TO COLD PLANE.

CONSTRUCT TYPE A CURB PER SANTA BARBARA COUNTY ENGINEERING STANDARD DETAIL 4-030.

REMOVE & REPLACE EXISTING PCC CURB. PAINT CURB TO MATCH EXISTING.

PROTECT IN PLACE EXISTING LOOP DETECTOR HANDHOLE.
1 8
13 18
5 R/W
& LANDSCAPE RESTORATION

BACKFILL W/ NATIVE SOIL, REGRADE,
STORKE ROAD @ HOLLISTER AVENUE
62 STORKE ROAD

MARKETPLACE DRIVE
1 1
1 1
10 R/W
R/W
6'
4'-2"

11.2'

8.5'

5.5'

11.6'

10.9'
5'
7'
4'
2'

7.7'
4'
12'
3 3
10 9.5'

5.1'

9.2'
4'-2"

8.9'2.8'

9.2'
6'3.3'
6'
R =3.00'
L =4.01'
Δ =76°33'29"
15 8'
5'
2'
2'
18 1701

99.18 CP MAG NAIL

14.2'

27.2'

35.3'

28.1'

POWER POLE

PORTLAND CEMENT CONCRETE IMPROVEMENTS

INSTALL DETECTABLE WARNING SURFACE
LEGEND

FL FLOW LINE

DESIGN ELEVATION

TP TOP OF PAVEMENT

TC TOP OF CURB

SW SIDEWALK

WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)

MANHOLE COVER
ROADSIDE SIGN (EX.)

RIGHT-OF-WAY LINE

SURVEY NAIL

EP EDGE OF PAVEMENT

PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.

LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)

GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:

1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.

2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.

WATER METER COVER

VAULT COVER (EX)
LEGEND

REMOVE & REPLACE/ CONSTRUCT PCC CURB

HIGH POINTHP
& LANDSCAPE RESTORATION
R/W

BACKFILL W/ NATIVE SOIL, REGRADE,
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,

0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER

LIP OR SPANDREL
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN

0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 03.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
STORKE ROAD @ MARKETPLACE DRIVE

ENLARGEMENT

CURB RAMPS
ENLARGEMENT NOTES:

PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.

REMOVE & REPLACE PCC SPANDREL PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.

RELOCATE EXISTING TRAFFIC BOX TO NEW LOCATION ION PLANS. ADJUST TRAFFIC BOX TO FINISHED GRADE.

SAWCUT & REMOVE PCC SIDEWALK & BACKFILL & REGRADE W/ CLEAN TOPSOIL. GRADE TO 1" BELOW TOP OF ADJACENT CONCRETE SURFACE & LIGHTLY TAMP BACKFILL TO PREVENT FUTURE SETTLEMENT.

PROTECT IN PLACE EXISTING LOOP DETECTOR HANDHOLE.
1 3
10 15
18 STORKE ROAD @ MARKETPLACE DRIVE
63 9'
2'
5'
4'-2"
10'

4.1'

5.2' C1
16'
5'
2'
2'
6 3.3' MIN.
6'
4'-2"
10 1.9'
4'
5'
10'
2'

0.5'

4.7'
7'
2'

10.5'
6'
5'
5'

4.6'

3.9' MIN.
1 1
1 4'

STORKE ROAD

STORKE PLAZA
18 3 3
7 28.4'

17.5'

14.7'

25.2'

POWER POLE

PORTLAND CEMENT CONCRETE IMPROVEMENTS

INSTALL DETECTABLE WARNING SURFACE
LEGEND

FL FLOW LINE

DESIGN ELEVATION

TP TOP OF PAVEMENT

TC TOP OF CURB

SW SIDEWALK

WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)

MANHOLE COVER
ROADSIDE SIGN (EX.)

RIGHT-OF-WAY LINE

SURVEY NAIL

EP EDGE OF PAVEMENT

PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.

LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)

GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:

1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.

2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.

WATER METER COVER

VAULT COVER (EX)
LEGEND

REMOVE & REPLACE/ CONSTRUCT PCC CURB

HIGH POINTHP
& LANDSCAPE RESTORATION
R/W

BACKFILL W/ NATIVE SOIL, REGRADE,
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,

0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER

LIP OR SPANDREL
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN

0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 03.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT

CURB RAMPS
STORKE ROAD @ STORKE PLAZA
1 STORKE ROAD @ STORKE PLAZA

ENLARGEMENT
ENLARGEMENT NOTES:

PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE. TRAFFIC SIGNAL MODIFICATIONS TO BE PERFORMED BY OTHERS.

REMOVE & REPLACE PCC SPANDREL PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.

TRIM & REMOVE EX. PLANT MATERIAL @ BACK OF SIDEWALK.

PROTECT-IN-PLACE EXISTING RETAINING WALL.

RELOCATE EXISTING TRAFFIC BOX TO NEW LOCATION ION PLANS. ADJUST TRAFFIC BOX TO FINISHED GRADE.

PROTECT IN PLACE EXISTING LOOP DETECTOR HANDHOLE.

CURVE TABLE
CURVE # LENGTH RADIUS DELTA
C1 3.78 5.00 43.3531
3 6
7 10
18 64
2'
2'

4.5' 5.8' 9.2'

3.5'

5.8'
5'

5.3'

5.5'
4'
9'4.5'
5'
5'

9.7'

STORKE ROAD

BOLLAY DRIVE
2'
2'
7 3 3
24 11
232
103.30

CP MAG NAIL
22'

22.2'

20.9'

15.9'
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,

0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER

LIP OR SPANDREL
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN

0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

POWER POLE

PORTLAND CEMENT CONCRETE IMPROVEMENTS

INSTALL DETECTABLE WARNING SURFACE
LEGEND

FL FLOW LINE

DESIGN ELEVATION

TP TOP OF PAVEMENT

TC TOP OF CURB

SW SIDEWALK

WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)

MANHOLE COVER
ROADSIDE SIGN (EX.)

RIGHT-OF-WAY LINE

SURVEY NAIL

EP EDGE OF PAVEMENT

PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.

LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)

GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:

1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.

2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.

WATER METER COVER

VAULT COVER (EX)
LEGEND

REMOVE & REPLACE/ CONSTRUCT PCC CURB

HIGH POINTHP
& LANDSCAPE RESTORATION
R/W

BACKFILL W/ NATIVE SOIL, REGRADE,
CONTRACT No.

PROJECT No.

ACCOUNT No.DATE
DATE
DATE

CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS

DESIGNED BY

DRAWN BY
BY

REVISIONS

DESCRIPTION

CHECK BY
REF. DATE

GOLETA, CA
SEAL:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 02.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL

PAVEMENT PROJECT
STORKE ROAD @ BOLLAY DRIVE

ENLARGEMENT
ENLARGEMENT NOTES:

REMOVE & REPLACE PCC SPANDREL PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.

PROTECT-IN-PLACE EXISTING RETAINING WALL.

CUT & SET DOMES AROUND UTILITY BOX COVER.

PROTECT IN PLACE EXISTING FIRE HYDRANT.
3 CURB RAMPS
7 11
24 STORKE ROAD @ BOLLAY DRIVE
65 SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
T-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

SHEET INDEX
SHT. DESCRIPTION SHT NOS.

TITLE SHEET 1
PROJECT OVERVIEW 2
TYPICAL CROSS SECTIONS 3-4
KEY LINE GEOMETRY 5-10
LAYOUT 11-13
PROFILES 14
CONSTRUCTION DETAILS 15-19
EXISTING UTILITY AND CONFLICT PLAN 20-24
UTILITY CROSS SECTIONS 25-26
PAVEMENT DELINEATION AND SIGN PLAN 27
QUANTITIES 28
SURVEY CONTROL 29
TREE REMOVAL PLAN 30

GENERAL INFORMATION
CITY OF GOLETA:
130 Cremona Dr. Suite B
Goleta, CA 93111
(805) 722-4306
Contact: Kent Yankee
CIVIL ENGINEER:

Bengal Engineering
360 S. Hope Ave. Suite C-110
Santa Barbara, CA 93105
(805) 563-0788
Contact: Scott Onishuk
LAND SURVEYOR:

Reese Water and Land
Surveying Services
900 Los Osos Valley Road, Suite B
Los Osos, CA 93402-3206
(805) 439-2741
Contact: Robert Reese
RIGHT OF WAY AGENT:

Hamner-Jewell
4476 Market St # 601
Ventura, CA 93003-7775
(805) 427-2239
Contact: Don Irelan & Lillian Jewell
The City of Goleta Department of Public Works

PROJECT PLANS FOR CONSTRUCTION
CITY PROJECT NUMBER 9062
THE STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS

CITY OF GOLETA, CALIFORNIA
TO BE SUPPLEMENTED BY CALTRANS STANDARD PLANS DATED 2018, SANTA BARBARA METROPOLITAN TRANSIT DISTRICT BUS STOP STANDARDS REVISED OCTOBER 1, 2004 AND

THE MOST CURRENT SANTA BARBARA COUNTY STANDARD PLANS AND SPECIFICATIONS

ANGELES
LOS

FRANCISCO
SAN
Selected Acronyms and Abbreviations
(See Catrans Std Plan A10A for complete list)

SANTA BARBARA COUNTY

BARBARA
SANTA
LOMPOC

SANTA MARIA
GOLETA
AB Aggregate Base
Abn Abandon
AC Asphalt Concrete
Adj Adjust
BB Beginning of Bridge
BC Beginning of Curve
BCR Beginning of Curb Return
Beg Begin
Bldg Building
BM Bench Mark
Bot Bottom
Br Bridge
Brg Bearing
BVC Beginning of Vertical Curve
BW Bottom of Wall
CAA Cable Anchor Assembly
C-C Center-to-center
Chnl Channel
CI Cast-iron
CIDH Cast In Drilled Hole
CIP Cast in place
CISS Cast in Steel Shell
CL Chain Link
Cl Class
C/L Centerline
Clr Clear
CM Corrugated Metal
Col Column
Conc Concrete
Cr Creek
D Depth
Deg Degree
Det Detail
DI Drainage Inlet
Dia Diameter
Diaph Diaphram
Dist Distance
Dwy Driveway
Ease Easement
EB East Bound
EC End of Curve
ECR End of Curb Return
EG Existing Ground
EOD Edge of Deck
EP Edge of Pavement
ES Edge of Shoulder
ETW Edge of Travelled Way
EVC End Vertical Curve
Exc Excavate
Exist Existing
Exp Expansion
Exp Jt Expansion Joint
Ext Exterior
F&C Frame and Cover
F&G Frame and Grate
Fdn Foundation
FES Flared End Section
FF Filter Fabric
FG Finished Grade
FH Fire Hydrant
Fig Figure
FL Flow Line
FOC Face of Concrete
FS Finished Surface
Ftg Footing
Ga Gauge
GP Grading Plane
Galv Galvanized
GR Guard Railing
Gtr Gutter
H Height
h, hr hour
HW headwall
Horz horizontal
HWM High water mark
HMA Hot Mix Asphalt
Irr Irrigation
Jct Junction
Jt Joint
L length
LOL layout line
LS lump sum
Lt Left
Max Maximum
MBGR Metal Beam Guard Rail
MH Manhole
Min Minimum
Misc Miscellaneous
Mod Modify
NTS Not to scale
Oblr Obliterate
OC Overcrossing
OD Outside Diameter
OG Original Ground
OH Overhead
O-O Out-to-out
Pp age
PB Pull box
PC Point of curvature or
Precast
PCC Pt of compound curvature
Ped Pedestrian
Perm Mtl Permeable Material
PG Profile Grade
PI Point of Intersection
P/L Property Line
PP Power Pole
Pipe Pile
POC Point on Curve
POT Point on Tangent
PRC Point of Reversing Curve
PS&E
Plans, specifcations & Estimate
PS Pre-Stressed
P/S Pre Stressed
PT Point of Tangent
Qty Quantity
R Radius
Reinf Reinforement
Rel Relocate
Ret Retaining
Rev Revised
RSP Rock Slope Protection
Rt Right
R/W Right of Way
Salv Salvage
SG Subgrade
Sht Sheet
Spec Special
Specification
Sta Station
Std Standard
Str Structure
SW Sidewalk
S Sewer
TC Top of Curb
TCB Traffic Control Box
TG Top of Grade
Top of Grate
TP Telephone Pole
Trans Transition
UON Unless otherwise noted
VV alve
Var Variable
VC Vertical Curve
W Width
WH Weep Hole
WM Wire Mesh
Water Meter
WW Wing Wall
WWLOL Wing Wall Layout line

SOUTH STORKE
HWY 101

HOLLISTER AVE

PHELPS RD
No Scale

VICINITY MAP

PROJECT LIMITS

TITLE SHEET
HOME
DEPOT
1 30

FINAL SUBMITTAL

CITY OF GOLETA
Reviewed by:

Signature Date
66 TYPICAL SECTION CONSTRUCTION NOTES:

MANY UNDERGROUND UTILITIES EXIST AND ARE NOT SHOWN.

SEE EXISTING UTILITY AND CONFLICT PLANS FOR MORE INFORMATION.

AB U S P A D
8" CONCRETE
18" AB (CLASS 2)
6" OVER-EX & RE-COMPACT SUB GRADE (95%)

B STORKE ROAD PLUG PAVING
7-1/2" AC
18" AB (CLASS 2)
C 3" COLD PLANE & TEMPORARY OVERLAY

D MAINLINE PAVEMENT RECONSTRUCTION
COLD PLANE 2-3/4" EXISTING SECTION
2" ARHM SURFACE COURSE
3/4" AC BASE COURSE

STRUCTURAL SECTIONS PER PLANS FROM
PAVEMENT ENGINEERING INC.

STORKE PAVEMENT REHABILITATION
SHEET 10 OF 39
TYPICAL SECTION NO. 3
E SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH

F REMOVE EXISTING CURB, BASE AND PAVING
G MEDIAN TREATMENT:

CONTRACTOR TO PROTECT EXISTING LANDSCAPE AND

IRRIGATION FOR OWNER TO RECONSTRUCT LANDSCAPING AND

IRRIGATION SYSTEMS AFTER THE PUBLIC WORKS CONTRACT IS
COMPLETE.

H MEDIAN TREATMENT:

STAMPED CONCRETE, BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.

CONCRETE IS 4" MIN. THICKNESS
BEDDED ON 4" MIN. CLASS 4 SUB BASE (ROUND SAND)
LAYOUT CONSTRUCTION NOTES:

I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT

J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT

K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER

MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER

SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS

L REMOVE AND DISPOSE OF EXISTING BUS STOP STRUCTURES,

RETAINING WALL AND COMPONENTS, SEE SPECIAL PROVISIONS
M BUS PAD:

REINFORCED CONCRETE, SEE COUNTY OF SANTA BARBARA
STANDARD 5-120 & 5-130
N CURB:

SEE COUNTY OF SANTA BARBARA STANDARD 4-030, TYPE A
O CURB & GUTTER:

SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
Q MEDIAN CURB:

SEE COUNTY OF SANTA BARBARA STANDARD 4-035
R MEDIAN CONCRETE TREATMENT:

STAMPED CONCRETE; BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.

S RECONSTRUCT BRICK PAVERS AS NECESSARY TO MATCH NEW

SIDEWALK
BUS SHELTER NOTES:

T DEMOLISH EXISTING WOOD BUS SHELTER
U REMOVE 8" X 8" SUPPORT POSTS AND FOOTINGS

V CONSTRUCT NEW MTD BUS SHELTER BY LNI CUSTOM
MANUFACTURING, INC. THE 15' STRUCTURE WITH FOOTINGS AND

ANCHORS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

W REPAIR SIDEWALK WHERE POSTS AND FOOTINGS WERE LOCATED

AND MATCH ADJACENT GRADES WITH NEW CONCRETE
X PROTECT HARDSCAPE, FEATURES TO REMAIN.

Y REMOVE AND DISPOSE OF EXITING BENCHES AND TRASH CANS

AND REPLACE WITH NEW BENCHES AND TRASH CANS PER MTD
STANDARDS.

LEGEND:

CONCRETE
3" COLD PLANE &

TEMPORARY OVERLAY

PLUG PAVING

SEE TYPICAL SECTIONS
SAWCUT

STAMPED CONCRETE

BRICK PATTERN

DAYLIGHT

NEW RIGHT-OF-WAY
TCETCE
R/W
Exist R/W
Exist R/W
Exist R/W
EASE
P/L
EASE
EASE
EASE
073-440-016 073-440-024 073-440-018
R/W
R/W
073-100-024
073-100-032073-100-030073-100-004
073-140-004
073-140-030
073-100-019
R/W

R/W EASE EASE
073-100-025
073-100-033
47 48
49 50
51 52
53 54
55 56
27 28 29 30 31 32 33
"STO"
"STO"R/W
R/W
TCE
TCE
R/W
R/W
R/W
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
PO-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

PROJECT OVERVIEW
STORKE RD.

HOLLISTER AVE
MARKETPLACE DR.

CORTONA RD.

EXTEND

BUS PAD

MEDIAN MODIFICATIONS

REMOVE BUS STOP AND

RIGHT-TURN EXTENSION

REMODEL BUS SHELTER
NORTH

STORKE ROAD
SCALE 1" = 40'
00 40' 80'
2 30
NOTES:

CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE

ENGINEERED TRAFFIC CONTROL AND PHASING PLANS

IN COORDINATION WITH MAINLINE PAVEMENT REPAIR
PROJECT.

CONTRACTOR SHALL ALSO BE REQUIRED TO PROVIDE

STORM WATER CONTROL PLANS AND TEMPORARY /
PERMANENT BMPs AS A PORTION OF THE MAINLINE
PAVEMENT REPAIR PROJECT.
67 10' & VAR.VAR.
"MED" LINE
5+00 TO 10+62.34
FL
"MED" LINE
FL
VAR.

CL
"STO" LINE
51+50 TO 52+87.85
10' & VAR.

VAR.VAR.OG
PGPG
B B
FF

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D
G
SAWCUT
SAWCUTEXISTING 30" HDPE STORM DRAIN
(E) FL (E) FL
±35'10' BUS POCKET8.58'
CL
"BW-1" LINEDL
50' & VAR.
2% & VAR.1.5% MAX3
1 PG
OG
A
5'

COLD PLANE
& TEMP.

OVERLAY±12'
5'

SIDEWALK
FROM
HOME
DEPOT

1.5% MAX VAR.

EX. R/W

52.5'
"BUS" LINE
1+00 TO 2+28
FL
"STO" LINE
47+75 TO 49+02
SAWCUT
1'
C

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D

SEE CONSTRUCTION DETAILS FOR LAYOUT OF

INTERSECTING SIDEWALK FROM HOME DEPOT
E
E
F
B
EXISTING 48" HDPE STORM DRAIN
50' & VAR.8.58'
CL
PG
3 1
"BW-1" LINEDL

1.5% MAX
EX. R/W

52.5'
"STO" LINE
49+02 TO 49+72
"BUS" LINE
2+28 TO 2+98
FL

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D

EXISTING BUS POCKET TO REMAIN
E
OG
EXISTING 48" HDPE STORM DRAIN
TYPICAL SECTION CONSTRUCTION NOTES:

MANY UNDERGROUND UTILITIES EXIST AND ARE NOT SHOWN.

SEE EXISTING UTILITY AND CONFLICT PLANS FOR MORE INFORMATION.

A BUS PAD
8" CONCRETE
18" AB (CLASS 2)
6" OVER-EX & RE-COMPACT SUB GRADE (95%)

B STORKE ROAD PLUG PAVING
7-1/2" AC
18" AB (CLASS 2)
C 3" COLD PLANE & TEMPORARY OVERLAY

D MAINLINE PAVEMENT RECONSTRUCTION
COLD PLANE 2-3/4" EXISTING SECTION
2" ARHM SURFACE COURSE
3/4" AC BASE COURSE

STRUCTURAL SECTIONS PER PLANS FROM
PAVEMENT ENGINEERING INC.

STORKE PAVEMENT REHABILITATION
SHEET 10 OF 39
TYPICAL SECTION NO. 3
E SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH

F REMOVE EXISTING CURB, BASE AND PAVING
G MEDIAN TREATMENT:

CONTRACTOR TO PROTECT EXISTING LANDSCAPE AND

IRRIGATION FOR OWNER TO RECONSTRUCT LANDSCAPING AND

IRRIGATION SYSTEMS AFTER THE PUBLIC WORKS CONTRACT IS
COMPLETE.

SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
X-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

TYPICAL SECTIONS

STORKE ROAD
SCALE 1" = 5'
005 ' 1 0'
3 30
68 CL
"STO" LINE
52+87.85 TO 54+30
9' & VAR. 12' & VAR.VAR.21' & VAR.
14' MAINLINE PAVEMENT

RECONSTRUCTION SEE

PAVEMENT ENGINEERING
INC. PLAN18'5.58'
DL
"BW-2"
LINE
"MED" LINE
5+00 TO 10+62.34
B B
B
FF
2 1 OG
PG
PG
PG

1.5% MAX
VAR. VAR.

VAR.

FLFL
74' TO 62'
"FL" LINE
2+00 TO 3+00
FL
R/W
D
H

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
F
DE
SAWCUT
SAWCUT
SAWCUT

SEE LAYOUTS FOR LIMITS OF

MEDIAN CONCRETE TREATMENT
EXISTING 30" HDPE STORM DRAIN
CL
"STO" LINE
54+30 TO 55+68
5' & VAR.9' & VAR.

PG

1.5% MAX
FL
5'
"BW-2"
LINE
±47'
"FL" LINE
3+00 TO 4+72
EX. R/W
62'
VAR.

B
F
E D D

EXISTING TO REMAIN

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN

MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLANOG
SAWCUT
H
FILL IN "HOLE" WHERE

BUS STOP IS REMOVED

PARKWAY LANDSCAPING

AND IRRIGATION TO BE

INSTALLED AND MAINTAINED

BY PROPERTY OWNER
TYPICAL SECTION CONSTRUCTION NOTES:

MANY UNDERGROUND UTILITIES EXIST AND ARE NOT SHOWN.

SEE EXISTING UTILITY AND CONFLICT PLANS FOR MORE INFORMATION.

A BUS PAD
8" CONCRETE
18" AB (CLASS 2)
6" OVER-EX & RE-COMPACT SUB GRADE (95%)

B STORKE ROAD PLUG PAVING
7-1/2" AC
18" AB (CLASS 2)
C 3" COLD PLANE & TEMPORARY OVERLAY

D MAINLINE PAVEMENT RECONSTRUCTION
COLD PLANE 2-3/4" EXISTING SECTION
2" ARHM SURFACE COURSE
3/4" AC BASE COURSE

STRUCTURAL SECTIONS PER PLANS FROM
PAVEMENT ENGINEERING INC.

STORKE PAVEMENT REHABILITATION
SHEET 10 OF 39
TYPICAL SECTION NO. 3
E SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH

F REMOVE EXISTING CURB, BASE AND PAVING
G MEDIAN TREATMENT:

CONTRACTOR TO PROTECT EXISTING LANDSCAPE AND

IRRIGATION FOR OWNER TO RECONSTRUCT LANDSCAPING AND

IRRIGATION SYSTEMS AFTER THE PUBLIC WORKS CONTRACT IS
COMPLETE.

H MEDIAN TREATMENT:

STAMPED CONCRETE, BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.

CONCRETE IS 4" MIN. THICKNESS
BEDDED ON 4" MIN. CLASS 4 SUB BASE (ROUND SAND)
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
X-2
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

TYPICAL SECTIONS

STORKE ROAD
SCALE 1" = 5'
005 ' 1 0'
4 30
69 L1
C1
L2
C2
L3
201
202
101
102
102
"STO" LINE
"SAW-1" LINE
"BW-1" LINE
"BUS" LINE
1 2
3 4
10 10
10+00.00 BEG
10+62.02 END
10+09.23 BC
10+47.27 BC
10+19.70 EC
10+57.88 EC
1+00.00 BEG
2+28.32 END
1+07.36 BC
1+29.03 BC
1+16.87 EC
1+38.55 EC
"SW" LINE
L43 C16
L44
C17
L45
L47
48 49
50 "BUS" LINE

SEGMENT ID
L1
C1
L2
C2
L3
START

STATION
1+00.00
1+07.36
1+16.87
1+29.03
1+38.55
START

NORTHING
1983291.08
1983298.44
1983307.76
1983319.16
1983328.49
START

EASTING
5997852.19
5997852.37
5997850.80
5997846.55
5997844.99
LENGTH

7.36 9.51

12.16 9.51

89.77 END

STATION
1+07.36
1+16.87
1+29.03
1+38.55
2+28.32

DIRECTION/
DELTA
N01°21'43"E
021°47'43"
N20°26'00"W
021°48'05"
N01°22'05"E
RADIUS

25.00 25.00
"SW" LINE

SEGMENT ID
L43
C16
L44
C17
L45
START

STATION
10+00.00
10+09.23
10+19.70
10+47.27
10+57.88
START

NORTHING
1983366.31
1983366.22
1983371.13
1983394.88
1983399.79
START

EASTING
5997793.17
5997802.40
5997811.11
5997825.13
5997833.98
LENGTH

9.23 10.47

27.57 10.61

4.13 END

STATION
10+09.23
10+19.70
10+47.27
10+57.88
10+62.02

DIRECTION/
DELTA
S89°26'20"E
060°00'00"
N30°33'40"E
060°48'24"
S88°37'55"E
RADIUS

10.00 10.00
"STO" LINE

SEGMENT ID
L47
START

STATION
10+01.40
START

NORTHING
1979517.55
START

EASTING
5997804.00
LENGTH
4655.32
END

STATION
56+56.72

DIRECTION/
DELTA
N01°22'05"E
RADIUS
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

KEY LINE GEOMETRY
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
5 30
70 302
303
402
403
505
506
507
508
509
510
2+00.00 BEG
2+60.12 BC
3+12.06 BC
2+80.85 EC
3+36.81 EC
1 2
3 5+00.00 BEG
10+62.34 END
5+38.21 BC
5+74.41 BC
7+74.04 BC
9+17.90 BC
10+01.55 BC
5+58.17 EC
5+92.49 EC
7+87.39 EC
9+56.20 EC
10+38.51 EC
5 6
7 8
9 10
L4
C3
L5
C4
L7
C6
L8
C7
L9
C8
L10
C9
L11
C10
L12
"MED" LINE
"FL" LINE
"BW-2" LINE
"SAW-2" LINE
"SAW-3" LINE
"STO" LINE
"SAW-3" LINE
52 53
54 "FL" LINE

SEGMENT ID
L4
C3
L5
C4
START

STATION
2+00.00
2+60.12
2+80.85
3+12.06
START

NORTHING
1983816.45
1983876.57
1983897.04
1983927.06
START

EASTING
5997842.67
5997842.45
5997845.26
5997853.77
LENGTH

60.11 20.73

31.21 24.75
END

STATION
2+60.12
2+80.85
3+12.06
3+36.81

DIRECTION/
DELTA
N00°12'49"W
016°03'04"
N15°50'15"E
014°28'10"
RADIUS

74.00 98.00
"MED" LINE

SEGMENT ID
L7
C6
L8
C7
L9
C8
L10
C9
L11
C10
L12
START

STATION
5+00.00
5+38.21
5+58.17
5+74.41
5+92.49
7+74.04
7+87.39
9+17.90
9+56.20
10+01.55
10+38.51
START

NORTHING
1983945.45
1983907.25
1983887.50
1983871.84
1983853.98
1983672.43
1983672.30
1983802.74
1983840.74
1983884.86
1983921.53
START

EASTING
5997886.33
5997885.42
5997887.84
5997892.13
5997894.57
5997895.24
5997903.84
5997908.17
5997904.37
5997893.90
5997890.06
LENGTH

38.21 19.96

16.24 18.07
181.55

13.35 130.51

38.31 45.34

36.97 23.82
END

STATION
5+38.21
5+58.17
5+74.41
5+92.49
7+74.04
7+87.39
9+17.90
9+56.20
10+01.55
10+38.51
10+62.34

DIRECTION/
DELTA
S01°22'05"W
016°41'57"
S15°19'53"E
015°07'04"
S00°12'49"E
177°53'04"
N01°54'07"E
015°14'33"
N13°20'25"W
014°42'30"
N01°22'05"E
RADIUS

68.50 68.50

4.30 144.00
144.00
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-2
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

MATCHLINE 54+40
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'

KEY LINE GEOMETRY
6 30
71 28
57 304 4043+97.51 BC
4+71.82 EC-END
4 5
4 11
12 L6
C5
"BW-2" LINE
"SAW-2" LINE
"STO" LINE
"HOL" LINE
"STO-N" LINE
"MED" LINE
"FL" LINE
55 56
56 "FL" LINE

SEGMENT ID
L6
C5
START

STATION
3+36.81
3+97.51
START

NORTHING
1983951.47
1984012.15
START

EASTING
5997857.46
5997858.91
LENGTH

60.70 74.31
END

STATION
3+97.51
4+71.82

DIRECTION/
DELTA
N01°22'05"E
021°17'14"
RADIUS
200.00
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-3
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
MATCHLINE 54+40

KEY LINE GEOMETRY
7 30
72 48
49 50
"STO" LINE
"SAW-1" LINE
"BW-1" LINE
"BUS" LINE
1 2
3 4
101
102
101+00.00 BEG
101+05.04 AP
101+11.40 BC
101+23.12 EC
101+25.19 BC
101+37.97 EC
102+77.45 AP
102+87.36 AP
102+98.19 END
201
202
201+00.00 BEG
202+27.00 END
201+60.94 AP
201+96.39 AP
201+22.29 AP
L13
L14
C11
L15
C12
L16
L17
L18
L19
L20
L21
L22
10 10
"SW" LINE
"SAW-1" LINE

SEGMENT ID
L19
L20
L21
L22
START

STATION
201+00.00
201+22.29
201+60.94
201+96.39
START

NORTHING
1983290.91
1983313.19
1983351.81
1983387.27
START

EASTING
5997859.42
5997860.06
5997861.40
5997861.68
LENGTH

22.29 38.65

35.46 30.61
END

STATION
201+22.29
201+60.94
201+96.39
202+27.00

DIRECTION/
DELTA
N01°39'14"E
N01°59'00"E
N00°27'28"E
N00°18'12"E
RADIUS
"BW-1" LINE

SEGMENT ID
L13
L14
C11
L15
C12
L16
L17
L18
START

STATION
101+00.00
101+05.04
101+11.40
101+23.12
101+25.19
101+37.97
102+77.45
102+87.36
START

NORTHING
1983291.39
1983296.37
1983302.69
1983314.22
1983316.16
1983328.69
1983468.12
1983477.82
START

EASTING
5997839.19
5997839.94
5997840.65
5997839.24
5997838.51
5997836.41
5997839.74
5997837.67
LENGTH

5.04 6.36

11.73 2.07

12.78 139.47

9.92 10.83
END

STATION
101+05.04
101+11.40
101+23.12
101+25.19
101+37.97
102+77.45
102+87.36
102+98.19

DIRECTION/
DELTA
N08°34'24"E
N06°26'37"E
026°52'38"
N20°26'00"W
021°48'05"
N01°22'05"E
N12°02'52"W
N07°47'39"W
RADIUS

25.00 33.58
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-4
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

KEY LINE GEOMETRY
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
8 30
73 52
53 54
"MED" LINE
"FL" LINE
"BW-2" LINE
"SAW-2" LINE
"SAW-3" LINE
"STO" LINE
"SAW-3" LINE
1 2
3 302
303
302+00.00 BEG
302+05.03 AP
302+60.14 BC
302+89.47 BC
302+82.44 EC
302+97.05 EC
402
403
402+00.00 BEG
402+30.21 AP
402+66.34 AP
403+14.20 AP
510505
506
507
508
509
510
5 6
7 8
9 10
505+00.00 BEG 510+93.64 END
506+12.59 AP
506+48.95 AP
507+00.30 AP
507+81.70 AP
508+10.04 AP
510+35.46 AP
L23
L24
C13
L25
C14
L29
L30
L31
L36
L37
L38
L39
L40
L41
L42
"BW-2" LINE

SEGMENT ID
L23
L24
C13
L25
C14
START

STATION
302+00.00
302+05.03
302+60.14
302+82.44
302+89.47
START

NORTHING
1983816.43
1983821.43
1983876.55
1983898.56
1983905.33
START

EASTING
5997836.56
5997837.07
5997836.87
5997839.89
5997841.81
LENGTH

5.03 55.11

22.29 7.04

7.58 END

STATION
302+05.03
302+60.14
302+82.44
302+89.47
302+97.05

DIRECTION/
DELTA
N05°47'47"E
N00°12'49"W
016°03'04"
N15°50'15"E
014°28'10"
RADIUS

79.58 30.00
"SAW-3" LINE

SEGMENT ID
L36
L37
L38
L39
L40
L41
L42
START

STATION
505+00.00
506+12.59
506+48.95
507+00.30
507+81.70
508+10.04
510+35.46
START

NORTHING
1983945.69
1983833.13
1983796.77
1983746.65
1983665.25
1983665.36
1983890.65
START

EASTING
5997876.33
5997873.64
5997873.78
5997884.97
5997885.27
5997913.62
5997921.10
LENGTH
112.59

36.36 51.35

81.40 28.35
225.42

58.18 END

STATION
506+12.59
506+48.95
507+00.30
507+81.70
508+10.04
510+35.46
510+93.64

DIRECTION/
DELTA
S01°22'05"W
S00°12'49"E
S12°34'58"E
S00°12'49"E
N89°47'11"E
N01°54'07"E
N20°36'14"W
RADIUS
"SAW-2" LINE

SEGMENT ID
L29
L30
L31
START

STATION
402+00.00
402+30.21
402+66.34
START

NORTHING
1983816.52
1983846.72
1983882.85
START

EASTING
5997859.93
5997860.39
5997861.11
LENGTH

30.21 36.13

47.86 END

STATION
402+30.21
402+66.34
403+14.20

DIRECTION/
DELTA
N00°52'46"E
N01°08'24"E
N01°20'44"E
RADIUS
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-5
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

MATCHLINE 54+40
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'

KEY LINE GEOMETRY
9 30
74 28
57 55
56 "BW-2" LINE
"SAW-2" LINE
"STO" LINE
"HOL" LINE
"STO-N" LINE
"MED" LINE
"FL" LINE
4 5
304
304+68.32 END
304+38.89 AP
304+62.59 AP
404
404+78.46 END
403+74.39 AP
404+22.36 AP
404+37.77 AP
404+45.38 BC
4 11
12 L26
L27
L28
L32
L33
L34
L35
C15
"BW-2" LINE

SEGMENT ID
L26
L27
L28
START

STATION
302+97.05
304+38.89
304+62.59
START

NORTHING
1983912.80
1984054.61
1984078.03
START

EASTING
5997842.94
5997846.32
5997842.72
LENGTH
141.84

23.70 5.73
END

STATION
304+38.89
304+62.59
304+68.32

DIRECTION/
DELTA
N01°22'05"E
N08°44'31"W
N45°42'20"W
RADIUS
L32
L33
L34
L35
C15
403+14.20
403+74.39
404+22.36
404+37.77
404+45.38
1983930.70
1983990.87
1984038.83
1984054.23
1984053.86
5997862.23
5997863.70
5997864.80
5997865.17
5997857.57

60.19 47.97

15.40 7.61

33.08 403+74.39
404+22.36
404+37.77
404+45.38
404+78.46
N01°24'03"E
N01°18'23"E
N01°22'45"E
S87°15'08"W
009°23'03" 202.00
"SAW-2" LINE

SEGMENT ID START

STATION
START

NORTHING
START

EASTING LENGTH END

STATION

DIRECTION/

DELTA RADIUS
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-6
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
MATCHLINE 54+40

KEY LINE GEOMETRY
10 30
75 Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
073-440-016
10" 6" MELA
14" EUC
16" MELA0" 10" 8" MELA
20" SYC
5" 4" OLIVE
6" 5" OLIVE
10" 6" OLIVE
16" SPRUCE
8" 5" OLIVE
14" SPRUCE
32" PINE
9" JAC
(32)
(36)
(33)
(34)
(36)
(32)
34 32
31 48
49 50
1 2
3 4
10+09.23

2.50'RT
10+05.00

2.50'RT
10+09.23

2.50'LT
M
NP
-1.50%
-3.11%
"STO"

41.90' LT "STO" 47+75.00
"BUS" 1+00 =

50.00' LT "STO" 49+02.00

SAWCUT AT EXISTING

JOINT IN BUS POCKET
"BUS" 2+28.32 =
1+00.00

13.01'LT
(38)
(37)
(37)
(36)
(35)
(34)

56.73' LT "STO" 49+72.50
"BUS" 2+97.66 =
-3.32%
-2.92%
-2.08%
140'
-2.41%
-1.50%
-1.50%
8' 10'
O
(33)
(35)
(34)
(33)
36 34
32 33
35 33
37 32
1+14.67

11.23'LT
1+26.96

8.58'LT
10+62.026.50'RT
10+62.026.50'LT
10+19.702.50'RT
10+57.88

2.50'RT
10+19.702.50'LT
10+47.272.50'LT
10+57.88

2.50'LT
I
J
J
JK
PL
SAWCUT"BUS" LINE
10 10
5'
"SW" LINE
TCE
TCE
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
10+00.00

2.50'RT
10+00.00

2.50'LT
10+04.97

2.50'LT
2+96.45

14.04'LT
2+77.88

8.59'LT
1+38.55

8.58'LT
10+47.27

2.50'RT JK
P
-4.80%
-1.50%

NEW UCSB
COM. MH
SEE SHEET C-4 FOR

BUS SHELTER LAYOUT
LAYOUT CONSTRUCTION NOTES:

I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT

J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT

K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER

MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER

SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS

L REMOVE AND DISPOSE OF EXISTING BUS STOP STRUCTURES,

RETAINING WALL AND COMPONENTS, SEE SPECIAL PROVISIONS
M BUS PAD:

REINFORCED CONCRETE, SEE COUNTY OF SANTA BARBARA
STANDARD 5-120 & 5-130
N CURB:

SEE COUNTY OF SANTA BARBARA STANDARD 4-030, TYPE A
O CURB & GUTTER:

SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
3" COLD PLANE &

TEMPORARY OVERLAY
SAWCUT

DAYLIGHT

NEW RIGHT-OF-WAY
TCETCE
R/W
LEGEND:

CONCRETE
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
L-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
LAYOUT
STORKE RD.

MARKETPLACE DR.
11 30
NOTES:

SEE EXISTING UTILITY AND CONFLICT PLANS
REGARDING LANDSCAPING AND IRRIGATION.

RIGHT OF WAY NEGOTIATIONS ARE UNDERWAY. THE

CURRENT CONCEPTS FOR THE TCE'S AND PROPOSED
ROAD RIGHT-OF-WAY ARE SHOWN IN "MAGENTA" LINES.

NOTE REGARDING RIGHT-OF-WAY:

1. FOR COMPLETE RIGHT-OF-WAY INFORMATION SEE

MAPS PREPARED FOR THIS PROJECT IN CITY
OFFICE.
76 P/L
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
073-440-024
073-440-018
Exist R/W
Exist R/W
Exist R/W
073-100-032
6" JAC
5" JAC 5" JAC
5" JAC
12" OLIVE 4" 6" OLIVE 12" PINE
14" SPRUCE
16" SPRUCE 14" PINE
(34)
(35)
(36)
(37)
(38)
(39)
(38)
(37)
(36)
(35)
(34)
(39)
(38)
35 36
37 38
38 39
36 37
37 52
53 54
1 2
3 5+92.49

0.00'T

23.40' LT "STO" 54+30
"MED" 5+00 =
5+74.41

0.00'T
5+58.17

0.00'T
5+38.21

0.00'T
7+74.04

0.00'T
5 6
7 8
9 10
7+87.39

0.00'T
9+17.90

0.00'T
9+56.20

0.00'T
10+01.55

0.00'T
10+38.51

0.00'T
180'
13' 5' 11' 11' 12' VAR. 19' 14'
8'
Q
Q

63.93' LT "STO" 53+00.00
"FL" 2+00 =
3+12.06

0.00'T
3+36.81

0.00'T
"STO"
CI
I I

19.10' LT "STO" 54+30
"MED" 10+62.34 =
(35)
(33)
(36)
(37)
(39)
35 37
2+87.88

5.58'LT
36 I
J
K
-1.50%
-1.41%
-1.48%
-1.49%
-1.70%
-0.24%
-1.74%
-1.35%
-1.78%
-1.80%
-2.79%
-2.41%
-2.85%
-2.39%
-1.78%
-0.70%
51+49.86

17.77'LT
51+50.64

10.57'RT
52+31.23

20.02'LT
52+81.06

32.40'LT
54+30.00

33.40'LT
53+76.05

12.67'RT
54+30.00

9.10'LT
53+00.48

46.72'LT
54+35.33

47.13'LT
R

LANDSCAPE

TO REMAIN
-3.45%
SAWCUT
"MED" LINE
"MED" LINE
SAWCUT
SAWCUT
"FL" LINE
38 36
38 R/W
R/W
R/W
R/W
R/W
R/W
TCE
TCE
TCE
TCE
12'
16'
O
P
2+00.00

5.54'LT
2+60.12

5.58'LT
2+60.12

0.00'T
2+95.38

6.53'LT
2+80.85

0.00'T
2+80.85

5.58'LT
3+00.08

2.58'LT
38 39
PROVIDE 4" PVC SLEEVE

UNDER NEW SIDEWALK

FOR FUTURE IRRIGATION
LAYOUT CONSTRUCTION NOTES:

I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT

J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT

K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER

MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER

SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS
O CURB & GUTTER:

SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
Q MEDIAN CURB:

SEE COUNTY OF SANTA BARBARA STANDARD 4-035
R MEDIAN CONCRETE TREATMENT:

STAMPED CONCRETE; BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.

SAWCUT

STAMPED CONCRETE

BRICK PATTERN

DAYLIGHT
LEGEND:

CONCRETE

PLUG PAVING

SEE TYPICAL SECTIONS

NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
L-2
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
LAYOUT
STORKE RD.

MATCHLINE 54+40
12 30
77 Exist R/W
Exist R/W
Ex
073-440-018
Exist R/W
(40)
(41)
(42)
(43)
(44)
(42)
(41)
(40)
(43)
(42)
(41)
(39)
41 40
39 55
56 28
4 4
11 12

66.05' LT "STO" 55+68.64
"FL" 4+71.82 =
3+97.51

0.00'T
O
P
(40)
I J
-1.50%
-1.50%
-0.77%
54+40.00

47.12'LT
54+96.04

47.13'LT
55+38.24

47.15'LT
R
K
"MED" LINE
"MED" LINE
"FL" LINE

SAWCUT LINE
R/W
R/W
R/W
R/W
R/W
TCE
TCE
R/W
12'
3+47.30

13.60'LT
4+41.98

8.90'LT
4+66.49

6.36'LT
4+71.81

8.92'LT
L S
PROVIDE 4" PVC SLEEVE

UNDER NEW SIDEWALK

FOR FUTURE IRRIGATION

REMOVE CONCRETE

AND BENCHES, LEAVE

EXPOSED FOR FUTURE

LANDSCAPING
LAYOUT CONSTRUCTION NOTES:

I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT

J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT

K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER

MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER

SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS

L REMOVE AND DISPOSE OF EXISTING BUS STOP STRUCTURES,

RETAINING WALL AND COMPONENTS, SEE SPECIAL PROVISIONS
O CURB & GUTTER:

SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:

SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
R MEDIAN CONCRETE TREATMENT:

STAMPED CONCRETE; BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.

S RECONSTRUCT BRICK PAVERS AS NECESSARY TO MATCH NEW

SIDEWALK
SAWCUT

STAMPED CONCRETE

BRICK PATTERN

DAYLIGHT
LEGEND:

CONCRETE

PLUG PAVING

SEE TYPICAL SECTIONS

NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
L-3
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
LAYOUT
STORKE RD.

MATCHLINE 54+40
HOLLISTER AVE.
13 30
78 10
20 30
40 50
60 10
20 30
40 50
60 PG
(OG)
(30.6)

30.49 (32.9)

30.79 (31.3)

31.09 121+00

30.49 2+28.32

31.26 0.60%
OG PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(34.9)

34.93 (38.0)

36.23 (38.3)

37.41 (38.6)

38.67 (39.8)

39.86 (40.9)

40.91 23452+00

34.93 2+25

35.78 2+60.12

36.41 3+36.81

38.33 3+75

39.323+97.51

39.81 4+71.81

41.37 2.10%

3.40%

1.80%

2.15%

2.60%

2.50%
OG
PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(34.9)

34.67 (35.6)

35.29 (36.1)

36.09 (37.1)

37.25 (38.2)

38.60 (39.3)

39.54 8 9 10 11
10+62.34

39.76 7+87.39

34.55 10+38.51

39.34 8+25

34.89 9+17.90

36.38 10+01.55

38.64 1.76%

1.90%

0.90%

1.60%

2.70%
OG
PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(38.9)

38.93 (38.2)

38.03 (37.4)

37.13 (36.3)

36.23 (35.5)

35.23 (34.8)

34.53 56785+00

38.93 7+80.72

34.317+87.39

34.55 7+00

35.23 7+74.04

34.19 6+50

36.23 1.70%

3.70%
-2.00%
-1.40%
-1.80%
OG
PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(34.2)

34.17 (35.0)

32.07 91 0 10
10+00

34.17 10+05

34.09 10+09.23

33.94 10+19.70

33.49 10+47.27

32.16 10+57.88

31.82 10+62.02

31.77 -1.50%
-3.64%
-4.32%
-4.80%
-3.24%
-1.26%
OG
PG
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
P-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

STORKE ROAD
SCALE H: 1" = 20'
V: 1" = 20'
00 20' 40'

PROFILES
"BUS" PROFILE "FL" PROFILE
"MED" PROFILE
"MED" PROFILE
14 30
"SW" PROFILE

STORKE ROAD
SCALE H: 1" = 10'
V: 1" = 10'
00 10' 20'
79 TCE
TCE
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
TCE
R/W
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
073-440-016
48 49
50 "STO"

31.16 TC

30.66 FS
48+02.94 48.21'L
= 1+29.03 "BUS"

31.74 FS
1+00.00

13.01'L

30.94 FS
47+75.00

34.68'L

30.99 TC

30.49 FS
47+75.00 41.90'L
= 1+00.00 "BUS"

31.03 TC

30.53 FS
47+82.36 41.91'L
= 1+07.36 "BUS"

31.09 FS
47+97.29

34.57'L

31.32 FS
48+35.94

34.15'L

31.59 FS
48+71.39

34.71'L

31.75 FS
49+02.00

35.28'L

31.09 TC

30.59 FS
47+91.64 43.69'L
= 1+16.87 "BUS"

31.22 TC

30.72 FS
48+12.22 50.00'L
= 1+38.55 "BUS"

31.76 TC

31.26 FS
49+02.00 50.00'L
= 2+28.32 "BUS"

31.38 FS
1+14.67 BC

11.23'L

31.27 FS
1+26.96 EC

8.58'L

31.28 FS
1+29.03 BC

8.58'L

31.34 FS
1+38.55 EC

8.58'L

31.73 FS
10+62.02 EC

6.50'R 31.81
FS
10+62.02 EC

6.50'L

32.19 FS
2+77.88 AP

8.59'L

32.59 FS
2+87.04 AP

11.25'L

33.03 FS
2+96.45

14.04'L

31.59 FS
1+00.00

7.00'L

31.18 FS
1+18.89

3.23'L

32.20 FS
10+47.27 BC

2.50'L

31.84 FS
10+57.88 EC

2.50'L

31.84 FS
10+58.02 BC

2.50'L

31.79 FS
10+58.02 BC

2.50'R

31.79 FS
10+57.88 EC

2.50'R

32.13 FS
10+47.27 BC

2.50'R

33.45 FS
10+19.70 EC

2.50'R

33.98 FS
10+09.23 BC

2.50'R

34.11 FS
10+05.00

2.50'R

34.19 FS
10+00.00

2.50'R

33.52 FS
10+19.70 EC

2.50'L

33.90 FS
10+09.23 BC

2.50'L

34.07 FS
10+04.97

2.50'L

34.14 FS
10+00.00

2.50'L
-1.50%
-3.00%
-3.32%
-2.92%
-2.08%
-2.41%
-1.50%
-1.50%
-4.80%
-0.60%
-0.60%
-1.00%

32.07 TC

31.57 FS
49+52.23 49.98'L
= 2+78.55 "BUS"

31.59 FS
1+05.00 AP

12.38'L

32.12 FS
2+78.50

2.71'L

32.53 FS
2+88.50

5.63'L

32.91 FS
2+97.66

8.30'L
"SW" LINE
1 2
3 4
10 "BUS" LINE
"STO" LINE
-1.50%

NEW UCSB
COM. MH

31.59 TC

31.09 FS
48+73.68 50.00'L
= 2+00.00 "BUS"
3" COLD PLANE &

TEMPORARY OVERLAY
SAWCUT

DAYLIGHT

NEW RIGHT-OF-WAY
TCETCE
R/W
LEGEND:

CONCRETE
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'

CONSTRUCTION DETAILS
STORKE RD.

MARKETPLACE DR.
15 30
NOTE:

DOWEL INTO EXISTING BUS PAD PAVEMENT.

SEE CALTRANS STANDARD PLAN P10,
"TRANSVERSE CONSTRUCTION JOINT FOR
EXISTING CONCRETE PAVEMENT" DETAIL.
80 R/W
R/W
R/W
R/W
TCE
TCE
P/L
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
073-440-024
073-440-018
Exist R/W
Exist R/W
Exist R/W
073-100-032
52 53
54 "STO"
-4.30%
-1.50%
-1.40%
-1.50%
-1.50%
-1.60%
-0.40%
-1.70%
-1.50%
-1.75%
-1.80%
-2.80%
-2.40%
-2.80%
-2.40%
-1.80%
-0.70%

35.57 FS
2+00.00

6.11'L

35.43 TC

34.93 FS
53+00.00 63.97'L
= 2+00.00 "FL"

35.68 FS
2+05.00 AP

5.58'L

36.99 FS
2+60.12 BC

5.58'L

37.51 FS
2+80.85 EC

5.58'L

37.68 FS
2+87.88 BC

5.58'L

37.91 FS
2+95.38 EC

6.53'L

38.02 FS
2+98.83

7.42'L

37.94 FS
3+00.08

2.58'L

37.43 TC

36.93 FS
53+80.62 63.31'L
= 2+80.85 "FL"

38.83 TC

38.33 FS
54+35.33 52.40'L
= 3+36.81 "FL"

36.91 TC

36.41 FS
53+60.09 65.63'L
= 2+60.12 "FL"
-1.90%-1.80%
-2.48%

33.93 FS
51+49.86

17.77'L

35.04 FS
52+31.23

20.02'L

35.83 FS
52+81.06

32.40'L

36.53 FS
53+17.41

33.40'L

38.94 FS
54+30.00

33.40'L

35.79 FS
53+00.48

46.72'L

34.32 FS
51+50.64

10.57'R

38.19 FS
53+76.05

12.67'R

39.60 FS
54+30.00

9.10'L

36.94 FS
53+66.81

47.12'L

38.21 TC

37.71 FS
54+10.84 55.51'L
= 3+12.06 "FL"

37.98 FS
54+14.68

47.14'L

40.26 TC

39.76 FS
54+30.00 19.10'L
= 10+62.34 "MED"

39.84 TC

39.34 FS
54+06.17 19.10'L
= 10+38.51 "MED"

39.14 TC

38.64 FS
53+69.61 14.38'L
= 10+01.55 "MED"

37.91 TC

37.41 FS
53+25.75 2.87'L
= 9+56.20 "MED"

36.88 TC

36.38 FS
52+87.85 1.84'R
= 9+17.90 "MED"

35.05 TC

34.55 FS
51+57.35 0.63'R
= 7+87.39 "MED"

34.69 TC

34.19 FS
51+57.27 7.97'L
= 7+74.04 "MED"

37.77 TC

37.27 FS
53+38.75 12.98'L
= 5+92.49 "MED"

38.09 TC

37.59 FS
53+56.55 15.84'L
= 5+74.41 "MED"

38.38 TC

37.88 FS
53+72.10 20.51'L
= 5+58.17 "MED"

38.74 TC

38.24 FS
53+91.79 23.40'L
= 5+38.21 "MED"

36.25 FS
53+30.68

46.98'L

36.28 TC

35.78 FS
53+24.98 64.66'L
= 2+25.00 "FL"

36.73 TC

36.23 FS
52+81.26 11.39'L
= 6+50.00 "MED"

35.73 TC

35.23 FS
52+31.28 10.01'L
= 7+00.00 "MED"

34.81 TC

34.31 FS
51+53.09 3.63'L
= 7+80.72 "MED"

35.39 TC

34.89 FS
51+94.96 0.98'R
= 8+25.00 "MED"
5 67
8 9
10 1
2 3
"STO" LINE
"MED" LINE
"MED" LINE
"FL" LINE

39.43 TC

38.93 FS
54+30.00 23.40'L
= 5+00.00 "MED"
SAWCUT

STAMPED CONCRETE

BRICK PATTERN

DAYLIGHT
LEGEND:

CONCRETE

PLUG PAVING

SEE TYPICAL SECTIONS

NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-2
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'

CONSTRUCTION DETAILS
STORKE RD.

MATCHLINE 54+40
16 30
81 R/W
R/W
R/W
R/W
TCE
TCE
R/W
Exist R/W
Exist R/W
Ex
073-440-018
Exist R/W
55 56
28 -1.50%
-1.50%
-0.77%

39.16 FS
3+47.30

13.60'L

39.08 FS
3+47.30

8.60'L

41.31 FS
4+41.98 AP

8.90'L

41.82 FS
4+66.49 AP

6.36'L

42.08 FS
4+71.82

8.92'L

41.35 FS
4+47.03

2.58'L

40.31 TC

39.81 FS
54+96.03 52.40'L
= 3+97.51 "FL"

41.89 TC

41.39 FS
55+68.64 66.05'L
= 4+71.82 "FL"

39.50 FS
54+74.87

47.10'L

40.53 FS
55+22.84

47.15'L

40.87 FS
55+38.24

47.15'L

40.68 FS
55+37.69

54.74'L

41.47 FS
55+69.37

64.18'L
-2.26%
3 4
11 12
4 5

39.82 TC

39.32 FS
54+73.52 52.40'L
= 3+75.00 "FL"
"MED" LINE
"STO" LINE
"FL" LINE
"MED" LINE
SAWCUT

STAMPED CONCRETE

BRICK PATTERN

DAYLIGHT
LEGEND:

CONCRETE

PLUG PAVING

SEE TYPICAL SECTIONS

NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-3
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'

CONSTRUCTION DETAILS
STORKE RD.

MATCHLINE 54+40
HOLLISTER AVE.
17 30
82 TCE
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
TCE
R/W
R/W
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE

EXISTING BUS PAD

NEW BUS PAD
11'5'10'8'

LANE LINES
TRASH
CAN

EXISTING CURB

NEW CURB
REMOVE

EXISTING WALL
2 V Y
2'
15'
3'
6'
3'
9'
3'
3'
6' 2'
2'
4' 5'
3'
NEW

SIDEWALK
6'x2' BENCH
6'x2' BENCH
8'

FRONT BUS
POCKET

TANGENT
POINT
2'

LNI BUS SHELTER

RELOCATE

EXISTING SIGN

NEW LOCATION OF

EXISTING SIGN

31.22 TC

30.72 FS
1+38.55

0.00 T "BUS" LINE
REMOVE

EXISTING

SIDEWALK

31.34 FS
1+38.55 EC

8.58'L

NEW UCSB
COM. MH
BUS SHELTER NOTES:

V CONSTRUCT NEW MTD BUS SHELTER BY LNI CUSTOM
MANUFACTURING, INC. THE 15' STRUCTURE WITH FOOTINGS AND

ANCHORS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

Y REMOVE AND DISPOSE OF EXITING BENCHES AND TRASH CANS

AND REPLACE WITH NEW BENCHES AND TRASH CANS PER MTD
STANDARDS.

SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-4
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 5'
00 10' 20'

CONSTRUCTION DETAILS
STORKE RD.
18 30
83 R/W R/W R/W R/W R/W

R/W R/W R/WR/W
E
E
E
E
E
E

EASE EASE
073-100-033
7"/8" JACARANDA
18" PINE
2" JACARANDA
3" & 4" JACARANDA
5" JACARANDA
6" & 7" JACARANDA

BUS SHELTER
(E) BUS PAD
(E) LANE LINES
(E) SEWER MANHOLE
(E) CURB & GUTTER
8'11'12'
(E) STREET LIGHT
(E) BACK FLOW PREVENTER
(E) TELEPHONE POLE
T
UVU V
W W
X
YY
Y
Y
Y Y
(E) LANE LINE
(E) DRIVEWAY
(E) DRIVEWAY
(E) WATER VALVES
BUS SHELTER NOTES:

T DEMOLISH EXISTING WOOD BUS SHELTER
U REMOVE 8" X 8" SUPPORT POSTS AND FOOTINGS

V CONSTRUCT NEW MTD BUS SHELTER BY LNI CUSTOM
MANUFACTURING, INC. THE 15' STRUCTURE WITH FOOTINGS AND

ANCHORS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

W REPAIR SIDEWALK WHERE POSTS AND FOOTINGS WERE LOCATED

AND MATCH ADJACENT GRADES WITH NEW CONCRETE
X PROTECT HARDSCAPE, FEATURES TO REMAIN.

Y REMOVE AND DISPOSE OF EXITING BENCHES AND TRASH CANS

AND REPLACE WITH NEW BENCHES AND TRASH CANS PER MTD
STANDARDS.

SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-5
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 5'
00 10' 20'

CONSTRUCTION DETAILS

HOLLISTER AVE
19 30
84 APWA
Utility Color Code
Red = Electric
Yellow = Gas-Oil-Steam
Orange = Communication and TV
Blue = Potable Water Lines
Green = Sewer Lines
Purple = Reclaimed Water Lines
GENERAL NOTES FOR EXISTING UTILITIES:

1. THESE PLANS SHOW THE APPROXIMATE

LOCATION OF EXISTING UTILITIES AND

THE ANTICIPATED UTILITY CONFLICTS
FOR THE PROJECT.

2. UTILITIES SHOWN AS MARKED BY DIG
ALERT DURING MARCH 2022 AND AS

SHOWN ON AVAILABLE RECORD
DRAWINGS.

3. PRIVATE CONNECTIONS TO PARKING LOT
LIGHTING IS UNKNOWN.

4. EXISTING UTILITIES NOT OTHERWISE

MARKED FOR ADJUSTMENT SHALL BE
PROTECTED IN PLACE.

5. RECORD DRAWINGS FOR WYNMARK
SHOW A 48" DIAMETER HDPE STORM

DRAIN ALONG THE WEST SIDE OF
STORKE ROAD. THEY WYNMARK PLANS

DO NOT MATCH THE STORM DRAIN
CONFIGURATION IN THE FIELD. UCSB

FIBER PLANS SHOW DIFFERENT STORM

DRAIN CONFIGURATION WHICH APPEARS
TO MATCH THE FIELD. THE STORM DRAIN

WAS NOT POTHOLED SO THE EXACT
CONFIGURATION IS UNKNOWN.

6. WYNMARK PLANS ALSO SHOW A FIRE

LINE ALONG THE WEST SIDE OF STORKE
ROAD NEAR THE HOME DEPOT BUILDING.

THE FIRE LINE WAS NOT MARKED BY "DIG
ALERT", EXACT CONFIGURATION IS
UNKNOWN.

7. PRIVATE IRRIGATION SYSTEMS EXIST

WEST OF THE SIDEWALK ALONG STORKE

ROAD AND IN THE PLANTED MEDIAN ON
STORKE ROAD. THE CONFIGURATION OF
THESE SYSTEMS IS UNKNOWN; NO

RECORD DRAWINGS WERE AVAILABLE
DURING DESIGN. THESE SYSTEMS

INCLUDE ELECTRICAL CONTROLS,

SPRINKLER HEADS, SUPPLY LINES AND
OTHER COMPONENTS.

8. CONTRACTOR SHALL COORDINATE WITH
ALL UTILITIES PER SPECIAL PROVISIONS.

GENERAL NOTES FOR UTILITY CONFLICTS:

1. WATER VALVES AND MANHOLE FRAMES
AND COVERS EXIST IN CITY STREET.

THESE WILL BE ADJUSTED TO GRADE
WITH THE "MAINLINE PAVEMENT
RECONSTRUCTION PROJECT" DESIGN BY
PAVEMENT ENGINEERING INC.

2. TRAFFIC LOOPS AND DETECTOR HAND

HOLES EXIST IN PAVEMENT, THESE WILL
BE AFFECTED BY "MAINLINE PAVEMENT
RECONSTRUCTION PROJECT". SEE

SPECIAL PROVISIONS REGARDING

RECONSTRUCTION OF TRAFFIC SIGNAL
COMPONENTS.

3. SIGNAL INTERCONNECT EXIST UNDER

THE SIDEWALK ON THE WEST SIDE OF
STORKE ROAD. THE CONDUITS ARE ~24"
BELOW EXISTING GRADE. THE

CONTRACTOR SHALL PERFORM

RELOCATION/LOWERING AS NECESSARY

AND COORDINATE WITH CITY TRAFFIC

ENGINEER TWO WEEKS PRIOR TO WORK
IMPACTING CONDUITS.

4. PRIVATE IRRIGATION SYSTEMS EXIST

WEST OF THE SIDEWALK ALONG STORKE

ROAD AND IN THE PLANTED MEDIAN ON
STORKE ROAD. THE CONFIGURATION OF
THESE SYSTEMS IS UNKNOWN;

CONTRACTOR TO POTHOLE, MARK, AND

CAP THESE SYSTEMS SO THE OWNER

CAN RECONSTRUCT THE LANDSCAPING

AND IRRIGATION SYSTEMS AFTER THE
PUBLIC WORKS CONTRACT IS COMPLETE.

5. CONTRACTOR SHALL COORDINATE WITH
ALL UTILITIES PER SPECIAL PROVISIONS.

6. SEE SPECIAL PROVISIONS FOR

CONTRACT TIME ALLOWANCES FOR
UTILITY WORK PERFORMED BY OTHERS.

7. CONTRACTOR TO PROVIDE POTHOLING
REPORT. SEE SPECIAL PROVISIONS.

COORDINATE WITH RESIDENT ENGINEER.

SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

EXISTING UTILITY AND

CONFLICT PLAN

SOUTH STORKE
HWY 101

HOLLISTER AVE

PHELPS RD
HOME
DEPOT

ANGELES
LOS

FRANCISCO
SAN

SANTA BARBARA COUNTY

BARBARA
SANTA
LOMPOC

SANTA MARIA
No Scale

VICINITY MAP
20 30

UTILITY CONTACT INFORMATION
CITY OF GOLETA:

Contact: Melissa Angeles
(805) 690-5122

GOLETA WATER DISTRICT
Contact: Richard Armstrong
(805) 964-6761

GOLETA WEST SANITARY DISTRICT
Contact: Joey Hilliard
(805) 681-3910

COX COMMUNICATIONS
Contact: Jose Murillo
(805) 681-3910

SCE TRANSMISSION
Contact: Buster Brown
(805) 490-5293

SCE DISTRIBUTION
Contact: Shawn Lee
(805) 535-5901

SCE TRANSMISSION TELECOM
Contact: Mike Payne
(661) 294-1511

SCG TRANSMISSION
Contact: John Cardilino
(805) 681-7968

SCG DISTRIBUTION
Contact: Karl Monteleone
(805) 681-7945
UCSB
Contact: John Loman
(805) 893-3399

FRONTIER
Contact: Lad Kuzela
(805) 964-8303

CROWN CASTLE
Contact: Michael Moats
(949) 936-0043

PROJECT LIMITS
GOLETA
85 W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S

SD SD SD
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
G
G G G
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
CTV
CTV
CTV
CTV
CTV
CTV
E
E E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
T
T
T
T
T

T T T T T
T
T T
T
T
T
T
G G G
G
W
W
W
W
W
W
W
48 49
50 TELEPHONE MANHOLE

ELECTRICAL CONNECTIONS

TO LIGHTS UNKNOWN
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
073-440-016
10" 6" MELA
14" EUC
16" MELA10" 10" 8" MELA
24" SYC
18" PINE 20" SYC
5" 4" OLIVE
6" 5" OLIVE
10" 6" OLIVE
16" SPRUCE
8" 5" OLIVE
14" SPRUCE
32" PINE
9" JAC
16 6
5 3
4 DRAINAGE

EASEMENT
TOP OF

CUT SLOPE
2 HOME DEPOT
A
A
21 22
UTILITY INFRASTRUCTURE IN CONFLICT:

UCSB VAULT

TELEPHONE/COMMUNICATION LINE

CABLE TV LINE

IRRIGATION BOX
1 2
3 4

TELEPHONE/COMMUNICATION LINE

ELECTRICAL LINE
5 6

UTILITY CONFLICT NOTES

STORM DRAIN

FIRE LINE
21 22
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-2
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

MATCHLINE 50+50
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
STORKE RD.

ATTENTION ROADWAY CONTRACTOR

SEE GENERAL NOTES FOR UTILITY

CONFLICTS REGARDING LANDSCAPING

AND SPRINKLERS
1 UCSB TO REPLACE VAULT WITH A

TRAFFIC-RATED MH AT THIS LOCATION
DURING CONSTRUCTION.
2, 3, 6
PROTECT UNDERGROUND UTILITIES.

DEPTHS ARE UNKNOWN.
21 30EXISTING UTILITY AND

CONFLICT PLAN
21 PROTECT EXISTING STORM DRAIN.
22 PROTECT EXISTING FIRE LINE.
4 CAP AND MARK IRRIGATION. SEE

GENERAL NOTES FOR UTILITY
CONFLICTS.
5 PROTECT UNDERGROUND UTILITIES.

DEPTHS ARE UNKNOWN.
86 S S S
W W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S

S S S S S
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

G G G G
G G
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
W
W
E
S
S
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
E
E
E
E
E
E
E
E
E E
E
E
T
T
T
T
T
T
T
T
T
T
T

T T T T
T
T
T
T
T
T
TR

G G G G G G
G
G
G
G G
G
G
G
G
G
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
51 52
53P/L
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
EASE
073-440-024
073-440-018
R/W
R/W
R/W
R/W
R/W
073 100 032
6" JAC
5" JAC 5" JAC
5" JAC
12" OLIVE 4" 6" OLIVE 12" PINE
14" SPRUCE
10 7
8 9

JANE AT THE

MARKETPLACE
23 CONFIGURATION OF STORM
DRAIN LATERAL TO D.I. IS
UNKNOWN.

McDONALDS
ROADWAY CONTRACTOR:

PROTECT GREASE TRAPS

AND UNDERGROUND
UTILITIES FOR McDONALDS.

DETAILS ARE NOT SHOWN

BECAUSE THIS IS OUTSIDE

THE FOOTPRINT OF THE
WORK.

TOP OF

CUT SLOPE
11 99
12 151413
B
B

NOT ALL UTILITIES EAST OF

PROPOSED WORK ARE SHOWN

AS THEY ARE OUTSIDE THE SCOPE
OF THE PROJECT.
24 WATER METERS
25 UTILITY INFRASTRUCTURE IN CONFLICT:

IRRIGATION BOX

TRAFFIC SIGNAL BOX

BACKFLOW PREVENTER

WATER VAULT

WATER METERS
7 8
9 10
11 UTILITY CONFLICT NOTES

TRANSFORMER PAD AND

UNDERGROUND ELECTRIC

TELEPHONE/COMMUNICATION LINE

CABLE TV LINE

ELECTRICAL LINE
12 13
14 15

TRAFFIC SIGNAL CONTROL

TRAFFIC SIGNAL INTERCONNECT

MANHOLE
23 24
25 SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-3
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

MATCHLINE 50+50
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'MATCHLINE 53+50
STORKE RD.

MARKETPLACE DR.
13, 14, 15
PROTECT UNDERGROUND UTILITIES. DEPTHS UNKNOWN.

SCE: (TRANSMISSION OR DISTRIBUTION)
23 TRAFFIC SIGNAL CONTROL WILL BE CHANGED TO
"AUTO SCOPE" BY OTHERS. EXISTING TRAFFIC LOOPS
WILL BE ABANDONED BY MAINLINE PAVING.
24 PROTECT OR LOWER SIGNAL INTERCONNECT. SEE
GENERAL NOTES FOR UTILITY CONFLICTS.
25 GWSD
PROTECT EXISTING MANHOLE RING AND STRUCTURE.
8 TRAFFIC SIGNAL BOX: ROADWAY CONTRACTOR

REST TO GRADE OF NEW SIDEWALK
9 WYNMARK:

RELOCATE BACKFLOW DEVICES CLEAR OF
GRADING.
10 GOLETA WATER DISTRICT: CURRENT VAULT

IN STREET, RELOCATE WATER VAULT TO FIT

WITHIN EXTENDED SIDEWALK
11 PROTECT WATER METERS.
12 SCE: TRANSFORMER PADS CLEAR OF
GRADING. DEPTH OF UNDERGROUND
SWEEP FROM STREET UNKNOWN.
22 30EXISTING UTILITY AND

CONFLICT PLAN
7 RECONSTRUCT MEDIAN IRRIGATION
SYSTEM. SEE GENERAL NOTES FOR
UTILITY CONFLICTS ON SHEET UC-1.
87 S S
S S S
SD
SD
SD

G G G G
T
T
T
T
T
T
T
E

E E E E E
E
W
E
E
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
TR
TR
TR
TR
TR
TR
TR
TR
TR
S
T

T T T T

T T T T T
W
W
W
W
W
W
W
W
W
W
W

W W W W W W W
E
E
E
TR
TR
TR
TR
TR
TR
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
TR
TR
TR
TR
TR
TR
TR
TR
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
S
S
S
S
S
S
S
S
S
S
S
TR
TR
TR

G G G G G G G G G G G
G G
G
G
G

G G G G G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E E
G
G
G
G
G
G
G
G
G
G
G
G
G

G G G G G G
G
TR
TR
TR
TR
TR
54 55
56 28 29
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
EASE
073-440-018
R/W
R/W
R/W
R/W
16" SPRUCE 14" PINE
19 17
18 20
16 NOT ALL UTILITIES EAST OF

PROPOSED WORK ARE SHOWN

AS THEY ARE OUTSIDE THE SCOPE
OF THE PROJECT.
23 TOP OF

CUT SLOPE JANE AT THE

MARKETPLACE
151413

UTILITY COMPANIES

NOTE THAT ROADWAY CONTRACTOR
WILL REMOVE BUS SHELTER.

C
C
D
D
24 UTILITY INFRASTRUCTURE IN CONFLICT:

TELEPHONE/COMMUNICATION LINE

CABLE TV LINE

ELECTRICAL LINE

STREET LIGHT

CABLE TV PEDESTAL
13 14
15 16
17 UTILITY CONFLICT NOTES

CABLE TV VAULT

TRAFFIC SIGNAL BOX

ELECTRICAL MANHOLE COVER
18 19
20 TRAFFIC SIGNAL CONTROL

TRAFFIC SIGNAL INTERCONNECT
23 24
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-4
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

MATCHLINE 53+50
NORTH

STORKE ROAD
SCALE 1" = 10'
00 10' 20'
STORKE RD.

HOLLISTER AVE.
13, 14, 15
PROTECT UNDERGROUND UTILITIES.

DEPTHS UNKNOWN.
16 RELOCATE EXISTING STREET LIGHT
TO STORKE STATION 54+40.

MODIFY ELECTRICAL SERVICE AS NECESSARY
FOR NEW LOCATION.

SET FACE OF POLE 2-FEET BEHIND TOP OF CURB.
17, 18

COX CABLE TO RELOCATE
CTV PEDESTAL 2' BEHIND NEW

BACK OF WALK AND CTV VAULT
3' BEHIND NEW BACK OF CURB.
19 ROTATE AND RESET SIGNAL BOX
TO NEW GRADE.
20 SCE TO RESET MANHOLE FRAME AND COVER TO MATCH NEW GUTTER. 23 TRAFFIC SIGNAL CONTROL WILL BE CHANGED TO "AUTO SCOPE" BY OTHERS.

EXISTING TRAFFIC LOOPS WILL BE ABANDONED BY MAINLINE PAVING. 24 PROTECT OR LOWER SIGNAL INTERCONNECT. SEE GENERAL NOTES FOR UTILITY CONFLICTS.
23 30EXISTING UTILITY AND

CONFLICT PLAN
88 S
G
G
MW
TSPB
TSPB E
E
E
TT
T
E
E
E
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
E

RWRWRWRWRW
TRTR
TR
TR
TR
RW
RW
S
S S
T
T
T
T
T
T
WWW
W

W W W W W W
E
EE
E E

E E E E
E
TR
TR
TR

EEEEEEE
E
TRTRTR
SD
SD
SD
SD
SDSD
SD
SD
SSSS
TR
TRTR
TR
TR
TR
TR
SD
E
TSPB
G
G

G G G G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
GGG
G
G G
G
G

UCSBUCSB
CTV
CTV

CTV CTV
E
E
E
T
T
TT
GGG
G
G
G
5556
28 29 30
31 32 33
R/WR/W
R/W
EASE
073-440-018
R/W
073-100-024
073-140-004

R/W R/W

R/W R/W

EASE EASE
R/W
E
R/W

EASE EASE
073-100-033
073-100-025 073-100-033
20 NOT ALL UTILITIES EAST OF

PROPOSED WORK ARE SHOWN

AS THEY ARE OUTSIDE THE SCOPE
OF THE PROJECT.

JANE AT THE

MARKETPLACE

UTILITY COMPANIES

OTE THAT ROADWAY CONTRACTOR
WILL REMOVE BUS SHELTER.

D
D
24 SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-5
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
24 30EXISTING UTILITY AND

CONFLICT PLAN
NORTH

STORKE ROAD
SCALE 1" = 20'
00 10' 20'
STORKE RD.

HOLLISTER AVE.

INTERESTED ONLY INSIDE OF THIS AREA
89 48+65
"STO" LINE
20 22
24 26
28 30
32 34
36 38
40 02 0 4 00-20-40-60-80-100
CL
RW
T
GT
SD
UCSB
G
E
CTV
T
T
W
S
W
FG
OG
R/W
20 22
24 26
28 30
32 34
36 38
40 53+15
"STO" LINE
20 22
24 26
28 30
32 34
36 38
40 42
44 46
48 50
02 0 4 00-20-40-60-80-100
T
G
UCSB
SD
E
TCTV
G
TR
S
W
CLR/W
RW
FGOG
20 22
24 26
28 30
32 34
36 38
40 42
44 46
48 50
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-6
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

UTILITY CROSS SECTIONS

SECTION A-A
SCALE: 1"=5'

SECTION B-B
SCALE: 1"=5'
25 30

STORKE ROAD
SCALE H: 1" = 5'
V: 1" = 5'
005 ' 1 0'
NOTES:

1. THESE UTILITY CROSS SECTIONS SHOW THE LAYOUT OF THE UNDERGROUND UTILITIES AS MARKED IN THE FIELD BY "DIG ALERT" IN MARCH 2022, AND AS BELIEVED TO BE LAYED-OUT ACCORDING TO AVAILABLE RECORD DRAWINGS.

2. WITH THE EXCEPTION OF THE STORM DRAIN, WHICH IS SHOWN AT APPROXIMATE DEPTH BASED ON FIELD MEASUREMENTS AT MANHOLES, THE DEPTH OF THE OTHER UTILITIES IS UNKNOWN.

3. SEE "SPECIAL PROVISIONS" REGARDING REQUIREMENTS FOR THE CONTRACTORS "POT HOLING REPORT". 90 54+15
"STO" LINE
30 32
34 36
38 40
42 44
46 48
50 02 0 4 00-20-40-60-80-100
T
UCSB
E
ET
CTV
CTV
T
CTV
TR
G
E
S
W

RW R/WCL
G
FG
OG
R/W
30 32
34 36
38 40
42 44
46 48
50 55+00
"STO" LINE
30 32
34 36
38 40
42 44
46 48
50 02 0 4 00-20-40-60-80-100
T
G
CTVET
SD
T
E
TR
G
S
W

RW R/WCL
FGOG
R/W
30 32
34 36
38 40
42 44
46 48
50 SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-7
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

UTILITY CROSS SECTIONS

SECTION C-C
SCALE: 1"=5'

SECTION D-D
SCALE: 1"=5'
26 30

STORKE ROAD
SCALE H: 1" = 5'
V: 1" = 5'
005 ' 1 0'
91 26 27 28 29 30
8'
12'
12'
12'
15'
11'
11' 11'
11'
12'
19'
14'
12'
12'
12'
11'
11'
11'
13'
12 1
12'
12'
5'
46 47
48 49
50 51
52 53
54 55
56 5'
6'
5'
R3-7R
R3-7R
R26
R81
R6-1

SIGN TO
REMAIN
R4-7 & OM2-1H

SIGNS TO
REMAIN
R4-7, OM2-1H
& R9-3

SIGNS TO
REMAIN
CUSTOM

SIGNS TO
REMAIN
13'
L=190'L=190'L=190'
L=190'
L=50'
L=170'
L=50'L=65'
L=65'
L=50'L=210'L=210'L=180'L=50'L=275'L=275'

XX TRAFFIC STRIPE DETAIL NUMBER
839A3938A3938A839A38A39
139 8 39A 138A 8 838A
38A
39 13'
39A 40
39A 8
L=76' L=80'L=70'L=83'
L=73' L=180'
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
PD-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

STORKE RD.

HOLLISTER AVE
MARKETPLACE DR.

PAVEMENT DELINEATION

AND SIGN PLAN
NORTH

STORKE ROAD
SCALE 1" = 40'
00 40' 80'
27 30
SEE "PAVEMENT ENGINEERING INC."

PLANS FOR MAINLINE STRIPING
NOTES:

1. LOCATION OF SIGNS ARE APPROXIMATE AND MAY BE MOVED IN THE FIELD TO ACCOMMODATE OBSTRUCTION.

2. CROSSWALKS PER CALTRANS STANDARD A24F, BASIC. WIDTH 10' AND LINE THICKNESS 1'.

3. ALL STRIPING AND PAVEMENT MARKING DETAILS AND LAYOUTS SHALL CONFORM TO THE

CURRENT STATE OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA

MUTCD), THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS AND THE STATE OF CALIFORNIA STANDARD PLANS, UNLESS OTHERWISE SPECIFIED.

4. LANE DIMENSIONS ARE FROM TOP OF CURB OR EDGE OF PAVEMENT TO CENTER OF STRIPE DETAIL.

5. ALL LONG LINE STRIPING SHALL BE PAINT.

6. ALL PAVEMENT MARKINGS, CROSSWALKS, AND LIMIT LINES SHALL BE THERMOPLASTIC.

7. FOR OTHER STRIPING AND MARKING NOT ASSIGNED A DETAIL NO. IN THE CA MUTCD, INSTALLATIONS ARE INDICATED BY SOLID LINES OR FILLED SHAPES. 92 48
49 50
51 52
53 54
55 56
27 28
"STO"
1 2
3 4
0 1
2 3
4 5
3 4
5 6
7 8
9 10
11 12
"BUS"
"FL"
"MED"
10 "SW" DAYLIGHT

DAYLIGHT

BASE, PAVING & HARDSCAPE - SUMMARY OF QUANTITIES

CONCRETE /

MEDIAN STAMPED CONCRETE ASPHALT CONCRETE COLD PLANE SIDEWALK CURB & GUTTER CURB / MEDIAN CLASS II AGG BASE CLASS IV AGG BASE HARDSCAPE

REMOVAL

SF FT CY SF FT CY TN SF FT CY SF FT CY FT SF CY FT SF CY SF FT CY SF FT CY SF

DESCRIPTION STATIONING
BUS PAD EXTENSION "BUS" STA 1+00 TO 2+98 1075.50 0.67 26.69 688.19 0.25 6.37 11.87 688.19 0.25 1075.50 1.50 59.75 1866.54 1507.81 0.33 18.43 7.36 2.00 0.55 120.96 0.66 2.96 1596.37 0.50 29.56 "SW" STA 10+00 TO 10+62.02 316.95 0.33 3.87 316.95 0.50 5.87 RIGHT TURN EXTENSION "FL" STA 2+00 TO 4+72 2083.38 0.63 48.23 89.85 1463.61 0.33 17.89 271.81 2.00 20.14 4226.52 1.50 234.81 3010.27 MEDIAN MODIFICATIONS "MED" STA 5+00 TO 10+62.34 1312.85 0.33 16.05 8014.18 0.63 185.51 345.61 562.34 0.66 13.74 8340.34 1.50 463.35 1312.85 0.33 16.05 392.43

SUMMARY
SUBTOTAL 2,388 43 10,098 234 447 688 3,288 40 279 21 683 17 15,556 793 1,313 16 5,269

ROADWAY EARTHWORK VOLUMES

CUT FILL
CY CY
BUS PAD 175 4
RIGHT TURN EXTENSION 81 23
LEFT TURN EXTENSIONS 15 25
TOTAL 271 52
EXPORT 219
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
Q-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

QUANTITIES
STORKE RD.

HOLLISTER AVE
28 30
NORTH

STORKE ROAD
SCALE 1" = 30'
00 30' 60'
NOTES:

1. EARTHWORK VOLUMES FOR THIS PROJECT ARE CALCULATED BY SURFACE SUBTRACTION.

2. THE VOLUMES ARE CALCULATED SUBTRACTING ORIGINAL GROUND TO BOTTOM OF SUBGRADE OR FINISHED GROUND AS APPROPRIATE.

3. VOLUMES INCLUDE THE VOLUMES OF EXISTING PAVEMENTS AND HARD SCAPE WHERE THEY EXIST.

4. "HARDSCAPE REMOVAL" INCLUDES PAVEMENT OR CONCRETE AREAS WHERE THEY EXIST.

ORANGE AREAS ARE HARDSCAPE REMOVAL
93 SHEET
PROJECT NO.

OF

PLAN DATE
9062
S-1
JANUARY 20, 2023
29 30
94 P/L
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
073-440-016
073-440-024 073-440-018
Exist R/W
Exist R/W
073-100-032
48 49
50 51
52 53
"STO"
R/W
R/W
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
1 2
3 4
5 6
7 8
X X
X
X
X X
X
X
TREE REMOVALS:
20" SYCAMORE
5" & 6" OLIVE
6" & 10" OLIVE
16" SPRUCE
5" & 8" OLIVE
14" SPRUCE
5" JACARANDA
16" SPRUCE
1 2
3 4
5 6
7 8
SHEET
PROJECT NO.

OF

PLAN DATE

CHECKEDDESIGN
R.C.E. 48052

PROJECT ENGINEER
DESIGN CONSULTANT:

BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,

BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
TR-1
NO. DATE REVISIONS APPD.

HAO SO

SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:

NORTH

STORKE ROAD
SCALE 1" = 20'
00 10' 20'

TREE REMOVAL PLAN
STORKE RD.

MARKETPLACE DR.
30 30
95 ATTACHMENT 3

2025 ARTERIAL PAVEMENT PROJECT SPECIFICATIONS

96 BOOK 1 OF 2

BID BOOK

FOR

2025 ARTERIAL PAVEMENT PROECT
CITY PROJECT NUMBER: N/A

FOR USE WITH CALTRANS STANDARD SPE CIFICATIONS DATED 2018, CALTRANS STANDARD PLANS DATED 2018 AND LABOR SURCHARGE AND EQUIPMENT RATES OF

THE CALIFORNIA DEPARTMENT OF TRANSP ORTATION INSOFAR AS THE SAME MAY APPLY AND IN ACCORDANCE WITH THE SPECIAL PROVISIONS.

Pre-Bid Meeting:

N/A

City of Goleta, 130 Cremona Drive, Suite B
Goleta, CA 93117

Bids to be received before:

April 8, 2025

PlanetBids

97 City of Goleta

Contract Documents

2025 ARTERIAL PAVEMENT PROJECT
98 Table Of Contents

SECTION I NOTICE TO CONTRACTORS NTC‐1
SECTION II BIDDING INSTRUCTIONS BI‐1
SECTION III PROPOSAL PROP‐1
SECTION IV AGREEMENT 1
SECTION V INSURANCE AND BONDS INS 1

SECTION VI CITY OF GOLETA CONSTRUCTION
SPECIFICATIONS GCS‐1
SECTION VII SPECIAL PROVISIONS SP‐1

99 SECTION I

NOTICE TO CONTRACTORS

100
NTC 1

NOTICE TO CONTRACTORS

INVITING SEALED BIDS

FOR THE
2025 ARTERIAL PAVEMENT PROJECT
City Project Number: N/A
PUBLIC NOTICE IS HEREBY GIVEN that the City of Goleta (“CITY”), invites sealed bids for the above stated project and will receive such bids via electronic transmission on the City of Goleta
Planet Bids portal site until April 8, 2025, at 3:00 PM Late proposals will be rejected.

No exceptions.

Copies of the Contract Documents and the Proposal Forms for bidding the project, may be obtained from the Pl
anetBids Website: https://pbsystem.planetbids.com. Proposals which do not acknowledge a
ddendums to the project documents will be rejected.

All communications relative to this pr
oject shall be conducted through PlanetBids.

Questions about alleged patent ambiguity of the plans, s pecifications, or estimate must be asked
before bid opening. After bid op
ening, the CITY does not cons ider these questions as bid protests.

A pre-bid meeting will be held at N/A.

It is required that th e Bidders have fully ins pected the Project site in all particulars and become thoroughly familiar with the terms and conditio ns of the Bid Plans and Special Provisions and local c
onditions affecting the performance and cost s of the Work prior to bidding and it is recommended
that this be done prior to attending this meeting.

Pursuant to California Labor Code Sectio n 1773, the City has ascertained the General Prevailing Rate of Wages in the County in which the work is to be done to be as determined by the Director of Industrial Relations of the State of California. Contractor is hereby made aware that information regarding prevailing wage rates may be obtained from the State Department of Industrial Relations and/or t he following webs ite address: https://www.dir.ca.gov/OPRL/2024- 1/PWD/Southern.html. The Contractor is required to post a copy of the applic able wage rates at the job site. Attention is directed to Section 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC of the State Standard Specific
ations.

The California Air Res
ources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regu lations (“Regulation”) which are effective on January 1, 2024 and apply broadly to all self-p ropelled off road diesel vehicl es 25 horsepower or greater and other forms of equipment used in California. A copy of t he Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as c odified in Title 13 of the C alifornia Code of Regulations section 2449 et seq. throughout the term of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors the most recent, valid Certificate of 101
NTC 2
Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.

Bidders must be registered on the City of Goleta’s Pl anetBids portal in order to receive addendum notifications and to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.

Bid must be accompanied by a bid security in the form of a money order, a certified cashier’s check, or bidder’s bond executed by an admitted surety, made payable to CITY. The bid security shall be an amount equal to ten per cent (10%) of the to tal annual bid amount included with their proposals as required by California law.

Note: All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) lowest bidders must be mailed or submitted to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope and be received or postmarked within three (3) City working days after the bid due date an d time for the bid to be co nsidered. The sealed envelope should be plainly marked on the outside, “SEALED BID SECURITY FOR 2025 ARTERIAL PAVEMENT PROJECT.”
The Project is subject to compliance monito ring and enforcement by the Department of Industrial Relations (DIR) per California Labor Code Section 1771.4, including prevailing wage rates and apprenticeship employment standards . Affirmative action to ensure against

discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The CITY her eby affirmatively ensures that all business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract.

In accordance with the California Public Contract Code 20103.5 when federal funds are involved in local agency contracts, no bid shall be invalidated by the failure of the bidder to be licensed in California at t he time of bid opening. However, at the time of award, the selected contractor shall be properly licen sed in accordance with the laws of the State and the City of Goleta. Contractor shall possess a valid Class A - General Engineering Contractor license prior to award of Contract. Said license shall be maintained during the contra ct period. It is the Bidder’s and Contractor’s responsibility to obtain the correct Contractor’s licenses. Bidders shall be skilled and regularly engage in the general class or type of work called for under this contract.

The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Sect ion 995.120, and that is a California admitted surety insurer.

Pursuant to Labor Code sections 1725.5 and 1771. 1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the DIR. No Bid will be accepted, nor any contract entered into without 102
NTC 3
proof of the contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project. Failure to provide proof of the contractor’s current registration pursuant to Labor Code Section 1725.5 may result in rejection of the bid as non-responsive.

The Contractor Company, including the Re sponsible Managing Offi cer (RMO) for the Contractor Company, shall demons trate a minimum of five (5) years' experience successfully performing projects of substantia lly similar type, magnitude, and ch aracter of the work bid. The CITY reserves the right to reject all bids, reject any bid that is not responsive to the invitation, or to waive any minor irregularity and to take all bids under advisement for a period of up to ninety (90) working days. Failure to provide proof of t he Contractor’s current registration pursuant to Section 1725.5 of the Labor Code may result in rejection of the bid as non-responsive. Failure to comply with enforcement provisions pursuant to Section 1771.4 of the Labor Code may result in a determination that the Bidder is not responsible.

Bids shall remain open and valid for a period of one hundred twenty (120) calendar days after the Bid Deadline.

Pursuant to Public Contract Code section 22300, the successful bidder may substitute certain securities for funds withheld by CITY to ensure performance under the Contract or, in the alternative, request the CITY to make payment of retention to an escrow agent.

The U.S. Department of Transportation (DOT) provides a toll-free “hotline” service to report bid rigging activities. Bid rigging activi ties can be reported Mondays through Fridays, between 8:00 a.m. and 8:00 p.m., Eastern Time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report these activities. The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction cont ract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.

Any protest to an intended award of this cont ract shall be made in writing addressed to the City Clerk prior to the award. Any protest may be considered and acted on by the City Council at the time noticed for award of the contract. To request a copy of the notice of agenda for award, please contact the City Clerk [email protected] or register on the CITY’s website (www.cityofgoleta.org).

CITY OF GOLETA
_________________________
Deborah S. Lopez, City Clerk
Published:

March 6, 2025
103
NTC 4

END OF NOTICE TO CONTRACT
ORS
104

SECTION II

BIDDING INSTRUCTIONS

105
BI- 1

SECTION II BIDDING INSTRUCTIONS
1 DEFINITIONS. Unless provided otherwise, the definitions in the contract documents are applicable to all contract documents.

1.1 “Addenda” means written or graphic instruments issued by the City before the bid deadline that modify or interpret the contract documents by additions, deletions, clarifications, or corrections.

1.2 “Alternate” means an amount stated in the bid for whic h the Bidder offers to perform the Work described in the Biddi ng Documents as Alternate Work, to be added or deducted from the Total Base Bid, which shall be Contractor’s responsibility if City accepts the Alternate Bid Item.

1.3 “Bid Deadline” means the date and time designated in the notice inviting sealed bids as the last date and time for receipt of bids, as may be revised by addenda.

1.4 “Bidder” means a person or firm that submits a bid.

1.5 “Bidding/Contract Docum ents” means the Contra ct, Addenda, Notice to Contractors, bidding instructions, Bid (including documentation accompanying the Bid and any post-bid documentation submitted prior to the Notice of Completion) when attached as an exhibit to the Contract, the Bonds, permits from jurisdictional regulatory agencie s, City of Goleta Construction Specifications, Special Provisions, Plans, State Standard Plans, Standard State Specifications, Revised Standard Specifications, Labor Surcharge and Equipment Rental Rates, Work Directives, Reference Specifications, Change Orders, Supplemental Agreements, Appendices, Project Plans and any other applicable documents not listed, including modifications incorporated in those documents.

1.6 “Contract Price” means the total aggr egate amount of the Contractor’s bid price based on the estimated quantities listed in the Bidding Sheet as set forth in the award of the Contract approv ed by the City Council, subject to adjustment for variances in quantit ies and changes pursuant to Change Orders executed in accordance with the Contract Documents.

1.7 “Inspector” means the person designated by the engineer to ensure specification compliance.

1.8 “Total Base Bid” means the sum stated in the bid for which bidder offers to perform the Work described in the cont ract documents, but not including alternates.

1.9 “Unit or Contract Unit Price” means an amount entered in the bid by bidder or a “Contract Item” price established by the City in the bid, as a price per unit of measurement for payment for material s, equipment or services including taxes, supervision, overhead and profit for a portion of the work described in the Contract Documents.

106
BI- 2
2 BIDDER’S REPRESENTATIONS. By making its bid, bidder represents that:

2.1 Bidder has read, understood, and made the bid pursuant to the requirements in the Contract Documents.

2.2 The Bidder, at its sole cost and expense, has carefully examined the Contract Documents and visited the Project site to become fully acquainted with the local site condi tions affecting the Work to be performed including transportation, disposal, handling, and storage of materials.

2.3 The bid and the Contract Unit Pr ices bid are based upon the labor, materials, equipment, and systems required by the Contract Documents.

2.4 Bidder and all subcontractors, regar dless of tier, have the appropriate registrations and current licenses i ssued by the State of California Contractor’s State License Boar d and Department of Industrial Relations (DIR) for the Work to be performed. If bidder is a joint venture, the bidder will have a joint venture license appropriate for the performance of the Work, and each me mber of the joint venture will likewise have the appropriate license. Business and professions code §§ 7000-7191 establish licensing require ments for contractors. If a bidder, that is a specialty contractor , submits a bid involving 3 or more specialized building trades, the Work of which is more than incidental and supplemental to the performance of the Work for which bidder holds a specialty contractor license, bi dder must also hold either (1) a specialty contractor “C ” license in each such trade or (2) a general engineering contractor “A” license. This requirement is applicable whether or not bidder lists a subcontractor for each such trade.

2.5 Bidder shall have the expertise, in cluding the Responsible Managing Officer (RMO) for the Contractor Company, demonstrating a minimum of five (5) years' experience succe ssfully performing projects of the same type, magnitude, and characte r of the work bid, and financial capacity to perform and complete a ll obligations under the Contract Documents.

2.6 Bidder is aware of and, if awar ded the contract, will comply with legal requirements in its performance of the Work.

2.7 Bidder is aware of and, if identified as the apparent lowest responsible bidder, would be required to pay City business license fee(s).

2.8 Bidder shall not damage or endanger and shall preserve and protect adjacent properties.

2.9 Bidder has familiarized itself wit h the staging and material storage constraints of the Project site and surrounding buildings and will confine its staging and storage operations to approved areas.
107
BI- 3

2.10 Bidder will coordinate its constr uction activities with the other contractors and utility companies performing work on the Project site, if any, including, but not limited to, any separate contractor retained by the City.

2.11 Bidder has checked the figures set forth in the bid schedule and understands that neither the City nor any officer or employee therefore will be responsible for any misunderst andings, errors, or omissions on the part of the Bidder in submitting it s Bid. The failure of a Bidder to receive or examine any of the Contract Documents or to inspect the site shall not relieve such Bidder from any obligation with respect to the Bid, the Contract, or the Work required under the Contract Documents. 3 CONTRACT DOCUMENTS.

3.1 Bidders may obtain complete sets of the Contract Documents from PlanetBids.

3.2 Bidders will use a complete set of Contract Documents in preparing bids.

3.3 The City makes copies of the Cont ract Documents available, on the above terms, for the sole purpose of obtaining bids for the Work and does not confer a license or grant permission for any other use of the Contract Documents.

3.4 The City does not assume any liabilit y or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Contract Documents.
4 INTERPRETATION OR CORRECTION OF CONTRACT DOCUMENTS.

4.1 Before submitting its bid, bidder will carefully study and compare the various documents comprising the C ontract Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the bid is submitted; will examine the project site, the conditions under which the Work is to be performed, and the local conditions ; and will at once report to the City’s representative errors, inconsistencies, or ambiguities discovered.

The drawings and specifications contained in these Contract Documents do not constitute a repr esentation or warranty that any conditions shown therein actually exist. All soil and test hole data, groundwater elevations, and soil analyses shown on the Plans or included in the Special Provisions apply only at the location of the test holes and to the depths indicated.

4.2 Bidder requests for clarification or interpretation of the Contract Documents will be addressed to the Cit y’s representative at least five (5) calendar days before the bid deadline.

4.3 Clarifications, interpretations, corrections, and changes to the Contract Documents will only be made by addend a. Purported clarifications, 108
BI- 4
interpretations, corrections, and changes to the Contract Documents made in any other manner will not be binding and bidders will not rely upon them.
5 PRODUCT SUBSTITUTIONS.

5.1 No requests for product substitutions will be considered before award of contract.
6 SUBCONTRACTORS.

6.1 Each bidder will list in the proposal form all first-tier subcontractors that will perform work, labor or render such services in excess of ½ of one percent of the total bid of the total bid or $10,000, whichever is greater.

The proposal form contains spaces for the following information when listing subcontractors: (1) work activity; (2) name of subcontractor; (3) city of subcontractor’s business lo cation; (4) California contractor’s license number, and (5) DI R public works contractor registration number. An inadvertent error in lis ting the California contractor’s license number or public works contractor re gistration number shall not be grounds for filing a bid protes t or grounds for considering the bid nonresponsive if the corrected contractor's license number is submitted to the City by the Bidder within 24 hours after the bid opening and provided the corrected contractor's license number corresponds to the submitted name and location for that subcontractor. Failure to list any of these other items on the proposal form will result in the City treating the bid as if no subcontractor was listed for the work and that bidder repr esents to the City that it is fully qualified to perform that portion of the Work and will so perform such Work.

6.2 Substitution of subcontractors after the bid deadline who are listed in the proposal form will only be allow ed with the City’s written consent and in accordance with California law.
7 ADDENDA.

7.1 Before the Bid Deadline, the City ma y modify the Work, the Contract Documents or any portion(s) thereof by the issuance of written addenda.

Addenda will be in writing and issued only by the City.

7.2 Bidders must be registered on the Cit y’s PlanetBids portal to receive addendum notifications. Addenda will be posted on the PlanetBids portal.

7.3 Addenda will be made available on PlanetBids.

7.4 The City will issue addenda so that they are received by prospective bidders not less than three (3) work ing days before the bid deadline.

Addenda that withdraw the request for bids or postpone the bid deadline may be issued any time before the bid deadline.
109
BI- 5

7.5 Each bidder is responsible for ensur ing that it has re ceived all issued addenda before submitting a bid. All bidders are required to acknowledge and confirm receipt of each and ever y addendum in their Bid Proposal Form. Failure to acknowledge all Ad denda may result in a Bid being deemed nonresponsive and not eligible for award of the Contract. 8 NOT USED
9 FORM AND STYLE OF BIDS.

9.1 Bids will be submitted on the proposal forms included with the Contract Documents. Bids not submitted on the City’s proposal forms will be rejected. All blanks on the proposal form will be filled in legibly.

9.2 Bidder’s failure to submit a price for any alternate or unit price will result in the bid being considered as non-responsive. If alternates are called for and no change in the lump sum base bid is required, enter “no change.”

9.3 Each bidder must fill out the “b idders statement of past contract disqualifications” form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The bidder must explain the circumstances of each disqualification.

9.4 Bidder will make no stipulations on the proposal form nor qualify the bid in any manner.

9.5 The bids will be based upon full completion of all the Work as shown on the plans and specifications. It is ex pressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the bidder (if awarded the contract) specifically agrees to construct a completed Work ready for the use and in the manner which is intended.

9.6 The proposal forms will be signed by a person or persons legally authorized to bind bidder to a contract. Bidder’s representative will sign and date the declaration of eligibility to contract included in the proposal form. Failure to sign and date the declaration will cause the bid to be rejected.
10 BID SECURITY.

10.1 Each bid must be accompanied by bid security, in the amount of 10% of the Total Base Bid on the bas e Contract Work, excluding any Alternate Bid Items, as security for bidder’s obligation to enter into a contract with the City on the terms stated in the proposal form and to furnish all items required by the Contract Documents.

10.2 All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) apparent lowest bidders must be ma iled to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope 110
BI- 6
and be received or postmarked within three (3) City working days of the bid due date and time for the bid to be considered. The sealed envelope should be plainly marked on the outside identifying the names as shown in the notice inviting sealed bids.

10.3 If the apparent lowest responsible bidder fails to sign the contract and furnish all items requir ed by the contract docu ments within the time limits specified in these bidding inst ructions, the City may reject such bidder and select the next apparent lo west responsible bidder until all bids have been exhausted or the City ma y reject all bids. In the event the bid is rejected, such bidder wil l be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the bid security, between the amount of the disqualified bid and the larger amount for which the City procures the Work. The City may also use the bid security to cover the cost of rebidding the project.

10.4 If a bid bond is submitted and an attorney-in-fact executes the bid bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the bid bond. The surety issuing the bid bond must be admitted to provide surety within the State of California.

10.5 The City will retain the bid security until the occurrence of one of the following:

10.5.1.1 All items required by the c ontract documents have been furnished and the contract has been signed by the successful bidder and the City.

10.5.1.2 The specified time has elapsed during which bids may be withdrawn.

10.5.1.3 All bids have been rejected.
11 BID DELIVERY.

11.1 The proposal forms, bid security, and all other documents required to be submitted with the bid must be submitted via electronic transmission on the City of Goleta PlanetBids portal site.

11.2 Bidders must be registered on the City of Goleta’s PlanetBids portal in order to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.

11.3 Bid Security shall be submitted in accordance with Section 10. “Bid Security” above and per the notice inviting sealed bids. 12 MODIFICATION OR WI THDRAWAL OF BID.

12.1 Bids may not be modified, withdraw n, or canceled within one hundred twenty (120) calendar days after the bid deadline unless otherwise 111
BI- 7
provided in any supplementary instructions to bidders. The bidder shall be prohibited from further bidding on the project and the bid bond shall be forfeited. The City, at its discretion, may aw ard the bid to the next responsive and responsible bidder. In the event the next bidder refuses to enter into the contract, that bidder’s bid bond shall then be forfeited. 13 OPENING OF BIDS.

13.1 Bids submitted in the manner requi red by these instructions and received on or before the bid deadline will be opened and available for viewing on PlanetBids.
14 EVALUATION AND REJECTION OF BIDS.

14.1 Bidders will be evaluated for respons iveness and responsibility based on bid proposal information provided in the bid documents under “designation of subcontractors” and bidder’s references.”

14.2 A responsive Bid is a Bid that conforms, in all material respects, to these Instructions to Bidders. Non-responsive Bids will be rejected.

14.3 A responsible bidder means a bi dder who has demonstrated the attributes of trustworthiness, quality, fitness, capac ity, and experience to satisfactorily perform fully t he requirements of the Contract Documents and the moral and business integrity and reliability that will assure good faith performance in the sole discretion of the City. Any determination of a bidder’s non-responsibility by the City shall be based on the fitness and capacity of the bidder to satisf actorily perform the obligations of the Contract, whether or not the bidder is qualified to perform those obligations, whether or not the bidder is trustworthy, and such other bases as may be relevant.

14.4 In addition to other provisions of the Contract Documents, upon the request of the City, a bidder whose Bid is under consideration for the award of the Contract s hall promptly submit sa tisfactory evidence to City showing the bidder’s financial resources, experience in the field, and organization and other factors evidencing bidder’s ability to successfully execute and complete the Contract.

14.5 The City reserves the right to reje ct any or all bids and to waive discrepancies, irregularities, informalities, or any other error in the bid or bidding, when to do so seems to best serve the public interest. The right of the City to waive errors applies even if the Contract Documents state that a discrepancy, i rregularity, informality, or other error make a bid nonresponsive, so long as the error does not constitute a material error. The City reserves the right, in its sole discretion, to: judge the bidder’s representations as stated in the proposal forms and any post- Bid information to determine whether or not bidder is qualified to perform the Work; be the sole j udge regarding the su itability of the products, services, or supplies offered; to not purchase all items or the full quantity of each item listed in the Bid Item List; reject any or all Bids; 112
BI- 8
waive any deficiencies, i rregularities, or informalit ies in any Bids or in the bidding process; modify, cancel, or withdraw the Notice Inviting Sealed Bids; issue a new Notice Inviting Sealed Bids; suspend or abandon the Project; seek the assist ance of outside technical experts in Bid evaluation; require a bi dder to provide a guarantee (or guarantees) of the Contract by a thir d party; and not issue a Notice to Proceed after execution of the Contract. In submitting a Bid in response to the Notice Inviting Sealed Bi ds, the bidder is specifically acknowledging the City holds these rights. The Notice Inviting Sealed Bids does not commit the City to enter into a Contract, to reject, in its sole discretion, all Bids, nor does it obligate the City pay for any costs incurred by bidders in preparation and submission of a Bid or in anticipation of a Contract. By submitting a Bid, the bidder disclaims any right to be paid for such costs.

14.6 The City may reject any bid not accompanied by the required bid security or any other item required by the contract documents, or a bid which is in any other way materially incomplete, irregular or not responsive to the bid request in the sole determination of the City. 15 AWARD.

15.1 The City may retain all bids for a period of one hundred and twenty (120) calendar days for examination and comparison, and to delete any portion of the Work from the contract.

15.2 The City may waive nonmaterial irr egularities in a bid and will accept the lowest responsive bid from a responsible bidder as determined by the City.

15.3 The City will determine the low bidder on th e basis of the total bid price in words on the bidding sheet as described on the bidding sheet.

15.4 City Staff will identify the apparent lowest responsive and responsible bidder and notify such bidder within (30) working days (unless the number of days is modified in any Addendum issued to bidd ers) after the Bid Deadline. Within ten (10) calendar days after receiving the City’s written notice that bidder was identified as the apparent lo west responsible bidder, bidder will submit to the City all of the following items as required by the City:

15.4.1 Two originals of the contract signed by bidder.

15.4.2 One original of the payment bond.

15.4.3 One original of the performance bond.

15.4.4 Certificates of insurance and additional insured endorsements.

15.4.5 Copy of current city of Goleta business license certificate.

15.4.6 Names of all subcontractors, wit h their DIR registration number, license numbers, addresses, telephone number, facsimile number and trade on bidders’ company stationery. Evidence, as required by the 113
BI- 9
city, of the reliability and responsibility of the proposed subcontractors such as statements of experience, statements of financial condition, and references.

15.5 A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the cont ractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. This Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.

15.6 If bidder submits the two original signed contracts and all other items within ten (10) working days after re ceiving the City’s notification, and all such items comply with the requirements of the contract documents, the City will submit the bid to the City Council for award of Contract.

Following City Council Award of Contract, the City will sign the contract and return a signed copy of the contract to bidder.
16 NOTICE OF INTENT TO AWARD CONTRACT.

Following the opening of bids and determi nation of the lowest responsible Bidder, the City will issue a notice of int ent to award the Contract, identifying the Bidder to whom the City intends to award the Contract. The award of the Contracts shall be made by the City Council.
17 PUBLIC RECORDS.

City seeks to conduct its business openly. Upon identification of the lowest responsive and responsible bidder and upon notifying such bidder, Bids shall be regarded as public, with the exception any elements of each Bid that are identif ied by the Bidder as business or trade secrets and plainly marked as “trade secret,” “confidential,” or “proprietary.” Each element of a Bid which a Bidder de sires not to be considered public must be clearly marked as set forth above; any blanket statement (i.e. regarding entire pages, documents, or ot her, non-specific designations) shall not be sufficient and shall not bind the City in any way whats oever. If City receives a request from a third party to make a Bid available for insp ection or copying, the City will notify the Bidder of the request. If a Bi dder instructs the City that th e information is not to be released, City will withhold the information, provided, the Bidder expeditiously seeks a protective order from a c ourt of competent jurisdiction to prevent such release. If disclosure is required by law (despite the Bidder’s request for confidentiality), the City shall not in any way be liable or responsible for the disclosure of such records or part thereof.
18 BID PROTEST.
114
BI- 10
Any registered Bidder may file a protest provided that each and all of the following are complied with:

18.1 The bid protest is in writing;

18.2 Protests based upon alleged defects or improprieties in the Contract Documents are filed with the City prior to the Bid Deadline;

18.3 All other protests are f iled and received by the City not more than five (5) calendar days following the date of City’s Notice of Intent to Award the Contract; and

18.4 The written bid protest sets forth, in detail, all grounds for the bid protest, including without limitation all fact s, supporting documentation, legal authorities and argument in support of the grounds for the bid protest.

All factual contentions must be supported by competent, admissible and credible evidence.

18.5 Any matters not set forth in the wr itten bid protest shall be deemed waived. Any bid protest not conforming to the foregoing shall be rejected by the City as invalid.
19 COMPLIANCE WITH CARB REGULATIONS
The City is a Public Works Aw arding Body, as defined under Title 13 California Code of Regulations Section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, a valid Certificate of Repor ted Compliance (“CRC”) for t he Bidder’s and its listed subcontractors fleet (including any applicable leased equipment or vehicles). Bidder must complete and submit the Fleet Compliance Ce rtification, on the form included in the bid package. Failure to provide a valid CRC for the Bidder’s fleet, and for the fleets of all listed subcontractors, or failure to comple te the Fleet Compliance Certification, may render the Bid non-responsive.
115

SECTION III

PROPOSAL
116
PROP- 1

SECTION III PROPOSAL

BID PROPOSAL
FOR
2025 ARTERIAL PAVEMENT PROJECT

TO THE CITY OF GOLETA (“City”):

In accordance with City’s Notice Inviting Sealed Bids, the undersigned Bidder herby proposes to furnish all materials, equi pment, tools, labor, and incidentals required for the 2025 ARTERIAL PAVEMENT PROJECT as set forth in the Plans, Specifications, and Contract Documents, and to perform all work in the manner and time prescribed therein.

Bidder declares that this Bid is based upon careful examination of the Work site, Plans, Specifications, Bidding Instructions, and all other Contract Documents. If this Bid is accepted for award, Bidder agrees to enter into a contract with City at the unit and/or lump sum prices set forth in the followi ng Bid Schedule. Bidder under stands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to City of the Bid Security accompanying this Bid.

Bidder understands that a Bi d is required for the entire Work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing Bids, and that final compensation under the Contract will be based upon the actual quantities of Work satisfactorily completed. THE CI TY RESERVES THE R IGHT TO INCREASE OR

DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT per Section 9- 1.06B INCREASES OF MORE THAN 25 PERCENT and Section 9-1.06C DECREASES OF MORE THAN 25 PERCENT. It is agreed that the unit and/or lump sum prices bid include all overhead, profit, appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amount, and words shall govern over figures.

If awarded the Contract, the undersigned further agrees that in the event of the Bidder’s default in executing the Contract and filing the necessary bonds and insurance certificates WITHIN TEN (10) WORKING D AYS after the City has mailed notice of the award of contract to the Bidder, the proceeds of the Bid Security accompanying this Bid shall become the property of the City and this Bid and the acceptance hereof may, at the City’s option, be considered null and void.

117
PROP- 2

SECTION III BID PROPOSAL
FOR

2025 ARTERIAL PAVEMENT PROJECT
The Project insurance requirements are per the State Standard Specifications, as modified by the City of Goleta Construction Specifications contained herein.

Full Legal Name of Bidder: _________________________________________ Type of Entity: ___________________________________________________ (corporation, partnership, etc.)
State of Incorporation / Organization: _________________________________ Mailing Address: ________________________________________________ City, State, Zip: _________________________________________________ Physical Address: _________________________________________________ (must be included even if PO box is used for mailing)
City, State, Zip: ___________________________________________________ Telephone Number: Area Code ( )
E m a i l A d d r e s s :

California Contractor License No.

Contractor (and sub-contractors) wishing to bid on public works contracts shall be registered with the State Department of Industrial Relations and certified to bid on Public Works contracts. Register at: https://www.dir.ca.gov/public- works/contractor-registration.html.

Contractor Department of Industrial Relations Registration No.

California Contract License Classification(s) __________________________

The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (23 CRF 635.110).

The work for which this bid is submitted is for construction in conformance with the Special Provisions (including the payment of not less than the Stat e general prevailing wage rates), the Project Plans described bel ow, including any addenda thereto, the contract annexed hereto, and al so in conformance with the California Department of Transportation Standard Plans, dated 2018, the California Department of Transportation 118
PROP- 3
Standard Specifications, dated 2018, and the Labor Surcharge and Equipment Rental Rates in effect on the date the work is accomplished.

The work to be done and referred to herein is in the City of Goleta, Santa Barbara County, State of California, and is to be constructed in accordance with the Contract Documents and the Prevailing Wage Rates of the Department of Industrial Relations.

The work to be done is described in the Contract Documents entitled 2025 ARTERIAL PAVEMENT PROJECT City of Goleta, California.

The undersigned, as Bidder, declares that the only persons or parties interested in this Proposal as principals are those named her ein; that this Proposal is made without collusion with any other person, firm, or corporation; that he or she has carefully examined the location of the proposed work and the Contract Documents; and proposes, and agrees if this Proposal is accepted, that he or she will Contract with the City of Goleta, in the form of a copy of the Agreement cont ained in the Bid Document, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract, in the manner and time therein prescribed, and according to the requirements of the Director, as therein set forth, and that he or she will take in fu ll payment therefore prices i ndicated in the Schedule of Bid Items, including all work modified by addendum numbers _____________________. (IF NONE, STATE NONE).

In accordance with the provisions of California Labor C ode Section 6707, whenever the State, a County, City and County, or City issues a call for bids for the construction of a pipeline, drainage, water, sewer, sewage dispos al system, boring or jacking pits, or similar trenches or open exca vations, which are five (5' ) feet or deeper, such call shall specify that each bid submitted in response thereto shall contain, as a bid item, adequate sheeting, shoring, and bracing or equivalent method, for the protection of life or limb, which shall conform to applicable safety orders.

As required under the provisions of California Public Contract Code Section 4104 et seq., any person making a bid or offer to per form the work, shall in his or her bid or offer, set forth: (a)(1) The name and lo cation of the place of business of each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under su bcontract to the primary Contractor specially fabricates and installs a portion of t he work or improvement acco rding to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent (0.5%) of the prime Contractor' s total bid or, in the ca se of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of one percent (0.5%) of the prime contract or’s total bid or ten thousand dollars ($10,000) whichever is greater; (2)(A) Subject to subparagraph (B), any information requested by the officer, 119
PROP- 4
department, board, or commission concerni ng any subcontractor who the prime contractor is required to list under this subdivision, other than the subcontractor’s name and location of business, may be submitted by the prime contractor up to 24 hours after the deadline established by the officer, depar tment, board, or commi ssion for receipt of bids by prime contractors; (B) A state or local agency ma y implement subparagraph (A) at its option; (b) The portion of the work that will be done by each such subcontractor under this Act. The prime Contra ctor shall list only one (1) subcontractor for each such portion as defined by the prime Contractor in his or her Bid.

120
PROP- 5
2025 ARTERIAL PAVEMENT PROJECT

BIDDING SHEET
The cost of all labor, material and equipment necessary for the completion of the work itemized, even though not shown or specified, shall be included in the unit or lump sum prices for the various items shown herein.

The City further reserves the right to reject any or all bids, to waive any informality or irregularity in any bid or the bidding proce dure, and to delete any items of work in the award of contract. The City's decision on the bid amount is final.

Bidders must bid on all items in the Bid Schedule including the Supplemental and/or Alternative Bid Items in order for their bids to be complete. The award of contract will be based on the criteria outlined in Section 14 of the Bidding Instructions.

In the case of unit basis items, the amount set forth under the "Item Total" column (total base bid in words) shall be the pr oduct of the unit price bid and the estimated quantity for the item.

Bids on lump sum items are item totals. If a unit price of a lump sum item is entered and it differs from the item total, the item total prevails.

Entries are to be expressed in dollars or decimal fractions of a dollar. Symbols such as commas and dollar signs are ignored and have no significance in establishing unit price or item total.

Unit prices and item totals are interpre ted by the number of digits and decimal placement. Do not round item totals or the total bid.

In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price prevails, except as provided in (a) or (b), as follows:
(a) If the amount set forth as a unit pric e is unreadable or other wise unclear, or is omitted, or is the same as the amount of the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price;
(b) (Decimal Errors) If the product of the entered uni t price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one- hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever mo st closely approximates percentage-wise the unit price or item total in the City's Final Estimate of cost.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise, if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided. 121
PROP- 6

REPLACE WITH PDF OF PROJECT SPECIFIC BIDDING SHEET

122
PROP- 7

LIST OF SUBCONTRACTORS

The Bidder shall list the name, address, license number, and description of work, bid item number, percentage of bid item subcontracted by cost and Departm ent of Industrial Relations Registration number for each subcontractor to whom the Bidder proposes to subcontract portions of the work, as required by the prov isions in Section 2-1.10 SUBCONTRACTOR LIST of the State Standard Specificat ions. Attention is also directed to Section 5-1.13 SUBCONTRACTING of the Specia l Provisions. Listed subcontra ctors must be registered with the Department of Industrial Relations. Pursuant to SB 854, this project is subject to compliance monitoring and enforcement by the Department of Industrial Relati ons (DIR). Bidder shall list the DIR registration number for each subcontractor.

Bidder proposes to subcontract certain portions of the Work which are in excess of one- half of one percent (0.5%) of the total amount base bid or $10,000, whichever is greater, and to procure materials and equipment from suppliers and vendors.

These Subcontractors are identified as follows:

Bid Item
Number(s)
Subcontractor
License
Number
Subcontractor
DIR
Registration
Numbe
r
Percent of
Total Bid
Subcontractor’s
Name & Address

123
PROP- 8
Bid Item
Number(s)
Subcontractor
License
Number
Subcontractor
DIR
Registration
Number
Percent of
Total Bid
Subcontractor’s
Name & Address

124
PROP- 9
BIDDER’S REFERENCES
The following are the names, addresses, and phone numbers for three public agencies for which Bidder has performed projects of the same magnitude and character of the work bid within the past five (5) years:

1. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount

2. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount

3. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount
The following are the names, addresses, and phone numbers for all brokers and sureties from whom Bidder intends to procure insurance bonds:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any local, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

125
PROP- 10

ELIGIBILITY TO CONTRACT
The successful Bidder is prohibited from performing work on this Project with a Subcontractor who is ineligible to perform work on the Project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

BIDDER’S INFORMATION
Bidder certifies that the following information is true and correct:

Bidder’s Name ___________________________________________________________ Business Address _________________________________________________________ ________________________________________________________________________ Telephone _______________________________________________________________ State Contractor’s License No. and Class ______________________________________ Original Date Issued Expiration Date _______________________________ DIR Registration No: _______________________________________________________

The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this Bid:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ The date of any voluntary or involuntar y bankruptcy judgments against any principal having an interest in this Bid are as follows:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ All current and prior DBA’s, alias, and/or fictitious business names for any principal having an interest in this Bid are as follows:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 126
PROP- 11
I declare under penalty of perjury under the laws of the State of California that the above representations are true and correct. Execut ed this _____ day of ____________, 20__, at ___________________ California.

Signature and Title of Bidder
or Authorized Representative

127
PROP- 12

BIDDER’S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS AND DEFAULTS

Identify all instances of being disqualified, removed, determined to be a non-responsible bidder, debarred, assessed liquidated damages, terminated for default or otherwise prevented from bidding on, or completing, a federal, state, or local government project.

1. Have you ever been disqualifi ed from any government contract?

Yes  No 

2. If yes, explain the circumstances including date of public entity action, name of project, contract award amount and current contact person at public entity:

____________________________________________________________ Signature and Title of Bidder or Authorized Representative 128
PROP- 13
BID BOND FOR:
2025 ARTERIAL PAVEMENT PROJECT

KNOW ALL PERSONS BY THESE PRESENTS that [Bidder] ________________________ __________________________ as PRINCIPAL, and __ _____________________________, a corporation organized under the laws of the State of __________ _______________ and licensed by the State of California to execut e bonds and undertakings as sole surety, as SURETY, are held and firmly bound unto the City of Goleta, as City, in the penal sum of ten percent (10%) of the total Base Bid Price on the base Contract Work, excluding any Alternate Bid Items submitted by PRINCIPAL to CITY for the above stated project, for the payment of which sum, PRINCIPAL and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas PRINCIPAL has submitted a proposal to CITY for the above stated project.

NOW, THEREFORE, the penal sum guaranteed by this bond shall be forfeited to the City in the event of any of the follo wing: (1) The aforesaid Principal with draws said bid after the Bid Deadline contrary to applicable law; or (2) Principal fails, within ten (10) working days after receipt of written notice that the contract has been awarded to Principal and tender of the Contract, to, deliver to City the executed Agreement, in the prescribed form, in accordance with the bid as accepted, and file with the City all documents required in Section 3-1.18 CONTRA CT EXECUTION of the City of Goleta Construction Specifications.

In case suit is brought upon this bond, SURETY further agrees to pay all reasonable attorneys’ fees and costs incurred by CITY in an amount fixed by the court. SURETY hereby waives the provisions of California Civil Code Sections 2845 and 2849.

IN WITNESS WHEREOF the parties hereto have se t their names, titles, hands, and seals this _______day of , 20__.

P R I N C I P A L :
( A d d r e s s )

B Y :
(Signature and Title of Authorized Officer)

B Y :
(Signature and Title of Authorized Officer)

129
PROP- 14
S U R E T Y :
( A d d r e s s )

B Y :
(Signature and Title of Authorized Officer)

B Y :
(Signature and Title of Authorized Officer)
Note: All signatures must be acknowledged befor e a notary public. Attach appropriate acknowledgment. Also, evidence of the authority of any person signing as attorney-in-fact must be attached.

130
PROP- 15

STATEMENT ACKNOWLEDGING PENAL AND CIVIL PENALTIES CONCERNING THE CONTRACTOR’S LICENSING LAWS
[Business & Professions Code § 7028.15; Public Contract Code § 20103.5]

The undersigned, a duly authorized representative of the Bidder, certify that I am aware of the provisions of California law and that I, or the company /individual on whose behalf this Bid is being submitted, hold a currently valid California contractor’s licens e as set forth in the Business and Professions Code § 7028.15 and Public Contract Code § 20103.5 (and any updates).

A contractor shall not be qualif ied to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unle ss currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violati on of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

B i d d e r :

License No.: Class Expiration date:

DIR Registration No.: _____________________

Date Signature

131
PROP- 16

DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code §§ 1777.1 and 1777.7; Public Contract Code § 6109] The undersigned, a duly authorized representative of the Bidder, certifies and declares that:

1. The Bidder is aware of Sections 1771.1 and 1777.7 of the California Labor Code, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The Bidder is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sect ions 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The Bidder is aware of California Public Contract Code Section 6109 (and any updates.)

4. The Bidder has investigated t he eligibility of each and every subcontractor the contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontra ctor on a public works projec t by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 and 1777.7 of the Labor Code, or any other provision of law.

5. A contractor or subcontract or shall not be qualified to bi d on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perfo rm public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, prov ided the contractor is regist ered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of , 20__, at ________________________, California.

Signature:

N a m e :

T i t l e :

Name of Company:

Note: Signature must be acknowledged before a notary public. Attach appropriate acknowledgment.

132
PROP- 17

NON-COLLUSION DECLARATION
FOR
2025 ARTERIAL PAVEMENT PROJECT

I am the [title] of [name of bidder], the
party making the foregoing bid, declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly, colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any m anner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pa y, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effe ctuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a co rporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state]

(Signature and Title of Authorized Representative)

133
PROP- 18

(THE BIDDER'S EXECUTION ON THE SIGNAT URE PORTION OF THIS PROPOSAL SHALL

ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH

ARE A PART OF THIS PROPOSAL)

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION

The bidder______________ ___________________________________________________, proposed subcontractor _______________________________________________, hereby certifies that he has_____, has not___, participat ed in a previous contract or s ubcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporti ng Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agen cy, or the form er President’s Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.

Note: The above certification is required by the Equal Employment O pportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60- 1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)

Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime contractors and subcontractors who have par ticipated in a previous contract or subcontract subject to the Execut ive Orders and have not f iled the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Direc tor, Office of Federal Contract Compliance, U.S. Department of Labor.
___________________________________________________________

134
PROP- 19

PUBLIC CONTRACT CODE

Public Contract Code Section 10285.1 Statement

In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has ___ , has not ___ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State Universi ty. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managi ng employee thereof, as referred to in Section 10285.1.

Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided.

The above Statement is part of t he Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

135
PROP- 20

PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE

In conformance with Public Co ntract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:

Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidd er, ever been disqualified, remov ed, or otherwise prevented from bidding on, or completing a federal, state, or lo cal government project because of a violation of law or a safety regulation?

Yes _____ No _____

If the answer is yes, explain the circumstances in the following space.

136
PROP- 21
PUBLIC CONTRACT CODE 10232 STATEMENT

In conformance with Public Cont ract Code Section 10232, the Cont ractor, hereby states under penalty of perjury, that no more than one final unappealable finding of c ontempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to co mply with an order of a federal court which order s the Contractor to comply with an order of the National Labor Relations Board.

Note: The above Statement and Questionnaire are part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement and Questionnaire.

Bidders are cautioned that maki ng a false certification may subject the certifier to criminal prosecution.

137
PROP- 22

DEBARMENT AND SUSPENSION CERTIFICATION

TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29

The bidder, under penalty of perjury, certifies that , except as noted below , he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, volunt ary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgement rendered agains t it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

Notes: Providing false information may result in criminal prosecution or administrative sanctions.

The above certification is part of the Bid. Signing this Bid on t he signature portion thereof shall also constitute signature of this Certification.

_________________________________________

138

PROP- 23

IRAN CONTRACTING ACT DISCLOSURE FORM

GENERAL

GENERAL REQUIREMENTS

A. Pursuant to the Iran Contract Act of 2010 (California Public Contract Code, Sections 2202- 2208), Bidders are ineligible to bid on projects with a public entity for goods or services of one million dollars ($1,000,000) or more if the Bidder engages in investment activities in Iran.

B. Bidders must provide the below disclosure form as a mandatory submittal for all projects in excess of $1,000,000. The Iran Contracting Act Disc losure Form shall be submitted by the 3 apparent low bidders within 7 working days after opening of the bids.

(California Public Contract, Sections 2202-2208)

When responding to a bid or proposal or executing a contract or renewal for a City contract for goods or services of $1,000,000 or more, a vendor must either: a) certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section 220 3(b) and is not a financ ial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 working days or more, if that other person will use the credit to provide goods or servi ces in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran cr eated by DGS; or b) demonstr ate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code Section 2203(c) or (d).

To comply with this requirement, please provide your vendor or financ ial institution name and complete one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of $250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)

OPTION #1 – CERTIFICATION

I, the official named below, certif y I am duly authorized to execute this certificat ion on behalf of the vendor/financial institution identified below, and the vendor/financial institution identified below is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million ($20,000,000) or more in credit to another person/vendor, for 45 working days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.

Vendor Name/Financial Institution (Printed)
By (Authorized Signature)
139

PROP- 24
Printed Name and Title of Person Signing
Date Executed Executed in

OPTION #2 – EXEMPTION

Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services.

If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please fill out the information below, and attach documentation demonstrating the exemption approval.

Vendor Name/Financial Institution (Printed)
By (Authorized Signature)
Printed Name and Title of Person Signing
Date Executed Executed in
140

PROP- 25

DRUG-FREE WORKPLACE POLICY AND

AFFIDAVIT

BID MAY BE DECLARED NONRESPONSIVE IF THIS FORM (COMPLETED) IS NOT ATTACHED.

Pursuant to City Council Resolution CC90-498 dated 6/26/90 the following is required.

The undersigned Proposer certifies that it and all subcontractors performing under this contract will provide a drug-free workplace by:

1. Publishing a "Drug-Free Workplace" statement not ifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the Contractor's workplace and specifying the actions that will be taken against employees for violations of such prohibition.

2. Establishing a Drug-Free Awareness Program to inform employees about:

a. The dangers of drug abuse in the workplace.
b. The Contractor's policy of maintaining a drug-free workplace. c. Any available drug counseling, rehabilitation, and employee assistance program. d. The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace.

3. Notify employees that as a condition of employment under this Contract, employees will be expected to:

a. Abide by the terms of the statement.
b. Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace.

4. Making it a requirement that each employee to be engaged in the performance of the Contract be given a copy on the "Drug-Free Workplace" statement.

5. Taking one of the following appropriate actions, within thirty (30) working days of receiving notice from an employee or otherwise receiving such notice, that said employee has received a drug conviction for a violation occurring in the workplace:

a. Taking appropriate disciplinary action against such an employee, up to and including termination; or
b. Requiring such employee to participate sati sfactorily in a drug abuse assistance or rehabilitation program approved for such purpose s by a federal, state, or local health, law enforcement or other appropriate agency.

* I certify that no person employed by this company, corporation, or business has been convicted of any criminal drug statute violation on any job site or project where this company, corporation, or business was performing work within three
(2) years of the date of my signature below.

EXCEPTION:

Date Violation Type Place of Occurrence
If additional space is required use back of this form.

*The above statement will also be incorporated as a part of each subcontract agreement for any and all subcontractors selected for performance on this project.

IN THE EVENT THIS COMPANY, CORPORATION, OR BUSINESS IS AWARDED THIS CONSTRUCTION CONTRACT, AS A RESULT OF THIS BID; THE PROPOSER WITH HIS/HER SIGNATURE REPRESENTS TO THE CITY THAT THE INFORMATION DISC LOSED IN THIS DOCUMENT IS CO MPLETE AND ACCURATE. IT IS

UNDERSTOOD AND AGREED THAT FALSE CERTIFICATION IS SUBJECT TO IMME DIATE TERMINATION BY THE CITY.

The Representations Made Herein On This Document Are Made Under Penalty Of Perjury. 141

PROP- 26

PROPOSER'S NAME:

BY: Date:

Signature Title
Effects of violations: a. Suspension of payments under this contract. b. Suspension or termination of the contract. c. Suspension or debarment of the contractor from receiving any contract from the City of Goleta for a period not to exceed five years.

FM 681 7/10/9
142

COMPLIANCE WITH ECONOMIC SANCTIONS
IN RESPONSE TO RUSSIA’S ACTIONS IN UKRAINE
SAPC Information Notice 22-15

Per Executive Order N-6-22, all contractors and grantees that have agreements valued at $5 million or more with agencies/departments subject to the California Governor’s authority are directed to report to their contracting or grantor agency or depar tment regarding their compliance with economic sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as sanctions imposed under state law, if any.

Instructions: Complete Section 1, provide a letter for Section 2 and return both to your CPA. 1) ATTESTATION OF COMPLIANCE:

Having conducted a good faith review, I attest that
(agency name) is in compliance with the economic sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as sanctions imposed under state law, if any.

Contractor/Provider Name (Printed): Contract Number (s):

By (Authorized Signature):

Printed name and title of authorized signor:

Date of Signed Attestation of Compliance:

2) REPORT OF ACTIONS/STEPS TAKEN:

Attach a brief report to this notice form, on your agency letterhead describing the steps and actions, if any, you have taken in response to Russia’s actions in Ukraine and to ensure compliance with the EO. Please note that responses may be subject to disclosure under the California Public Records Act. Accordingly, please do not include any confidential information or disclosures that could pose security risks.
143

Fleet Compliance Certification.

Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:

The Fleet is subject to the requirem ents of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).

The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exem pted and a detailed reasoning is attached hereto.

Name of Bidder:_________________________________________________

Signature: ______ ____________________________________________

Name: ________________________ __________________________

Title: __________________ ________________________________

Date: ________________________ __________________________

144

SECTION IV

AGREEMENT

145
1 [ Rev October 2023]

REPLACE WITH PDF OF PW CONSTRUCTION CONTRACT FOUND IN LEGAL REVIEW  GENERAL  PW CONSTRUCTION CONTRACT.DOCX
146

SECTION V

INSURANCE AND BONDS

147
INS 1

INSURANCE REQUIREMENTS

General Liability Insurance
The general liability must be at least combined single limits of no less than $2,000,000 per occurrence for all covered losses and no less than $4,000,000 general aggregate, $25,000,000 Umbrella or excess liability, and must contain:

1. Extension of coverage to the City, its officials, officers, agents and employees, as additional insureds, with respect to Contractor's liabilities hereunder in insurance coverages identified above;

2. A provision that coverage will not be canceled or subject to reduction until at least thirty (30) working days' prior written notice has been given to the City Clerk, addressed to 130 Cremona Drive, Suite B, Goleta, CA 93117;

3. A provision that Contractor's insurance shall apply as primary, and not excess of, or contributing with, the City;

4. Contractual liability coverage sufficiently broad so as to include the liability assumed by the Contractor in the indemnity and hold harmless provisions of the Standard Condition;

5. A cross liability clause, or equivalent wordi ng, stating that coverage will apply separately to each named or additional insured as if separate policies had been issued to each;

6. A broad form proper ty damage endorsement;

7. A provision that the policies be provided on an "occurrence" basis;

8. Coverage for XCU (explosion, collapse, und erground) hazards if applicable to the work; and

9. Products and complet ed operations coverage.

Umbrella or Excess Liability polici es (Over Primary) if used to meet limit requirements shall provide coverage at least as broad as specified for underlying coverages and covering those insured in the underlying policies. Any such policy shall include a drop-down provision providing primary coverage above a maximum $25,000 self-i nsured retention for liability not covered by primary but covered by the umbrella. Cover age shall be “pay on behal f,” with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion of claims or suits by one insured against another. Coverage shall be applicabl e to City for injury to employees of Contractor, subcontractors or others involved in t he Work. Limits are subject to review but in no event less than $2,000,000 per occurrence for a ll covered losses and no less than $4,000,000 general aggregate, except with respect to umbrella or excess liability which must be no less than the amount set forth above.

Approval of insurance by the Cit y or acceptance of the certificat e of insurance by City shall not relieve or decrease the extent to which the Contractor may be held responsible for payment of damages resulting from Contractor's services or operation pursuant to the Agreement, nor shall it be deemed a waiver of City's rights to insurance coverage hereunder.

Policy Forms, Endorsements and Certificates
Provide and maintain current certificates of Insurance on forms supplied by the City and evidencing the above coverage to City prior to exec ution of this Agreement by City. Exercise due diligence to require any and all subcontractors and/or sub-s ubcontractors and all tiers of such subcontractors to provide General and Auto mobile Liability, and Wo rkers' Compensation and Employer's Liability Insurance with minimum limits of coverage and upon terms and provisions required above.
148
INS 2

NOTICE TO INSURANCE BROKER
Your client has been awarded a bid by the City Council of the City of Goleta to perform a public works project know n as ____________________ __________. The Contract Conditions for that project require your client ("the Contractor ") to return certain evidence of insurance and bonds to the City Attorney of the City within fifteen (15) working days after the Bid award, or else the Bid award may be terminated and awarded to another company.

This package contains the information you will need as an insurance broker to provide the appropriate insurance and bonds to the City. The insurance coverages the Contractor needs are specified in the section ent itled "Insurance Requirements." Pl ease note that, in addition to the insurance certificate itself, copies of several endorsements must be actually furnished for review.

Please refer to Special Provisions for modifications of the Standard Construction Specifications and the requirements of this insurance packet.

Please use the standard City of Goleta Bond Forms provided in this package.

The Bonds required must each be in the penal amount of: $______________________.

Documents should be forwarded to or questions addressed to:

Office of the City Attorney
City of Goleta
130 Cremona Drive, Suite B
Goleta, CA 93117
(805) 961-7500
When forwarding the documents, please refer to the project name so that the documents can be matched with the Contract for which they are submitted.

Thank you.

149
INS 3

INSURANCE REQUIREMENTS
In addition to Section 7-1.06 INSURANCE of the State Standard Specifications the:

A. Evidence of Maintenance Required. The Contract or shall, at all times, maintain in full force and effect at a minimum the insurance required by this section; and the Contractor shall not allow any subcontractor to commence work until similar insurance required of the subcontractor has been obtained and filed. An original Certificate of Insurance, and copies of all required endorsements, all in a form approved by the Director, evidencing all required coverage or policies shall be filed after the award of the bid and prior to approval of the Contract by the City Council. Contractor shall provide ten (10) working days prior written notice to the City of any reduction of coverage limits or cancellation of the coverage or policies shall be given to the City of Goleta as Certificate holder.

B. Qualifying Insurers. With the exception of the State Compensation Insurance Fund, all required insurance policies shall be issued by companies licensed to do business in the State of California and who hold a current policy holders alphabetic and financial size category rating of not less than AVII according to the most recent issue of Best' s Insurance Reports.

C. Insurance Required. Commercial General Liability, automobile liability, and workers' compensation insurance shall be maintained as follows:

1. Commercial General Liability
for Minor Construction
Projects
(Projects under $1,000,000)
$2,000,000 each occurrence
$4,000,000 aggregate
5,000,000.00 Umbrella or excess
liability
Personal Injury:
$2,000,000 each occurrence
$4,000,000 aggregate
5,000,000.00 Umbrella or excess
liability

Commercial General Liability
for
Major Construction Projects
(Projects over $1,000,000)
$5,000,000 each occurrence
$10,000,000 aggregate
25,000,000.00 Umbrella or excess
liability
Personal Injury:
$5,000,000 each occurrence
$10,000,000 aggregate
25,000,000.00 Umbrella or excess
liability

150
INS 4

The Commercial General Liability policy shall include coverage or endorsements for:
a. Completed operations.
b. Losses related to independent cont ractors, products and equipment. c. Explosion, collaps e and underground hazards.

The Commercial General Liability insurance s hall include the following, copies of which shall be provided:
a. Inclusion of the City of Goleta, and it s officers, agents, employees, and volunteers, as additional insureds (except for workers‟ compensation) as respects services or operations under the Contract. The additional insured endorsement for the general liability policy shall be at least as broad as the Insurance Services Office (“ISO”) CG 20 38 04 13 or an equivalent, blanket endorsement or section of the policy.

Endorsements must include coverage for on-going and completed operations.

Endorsements shall cover the City of Goleta, its officers, agents, employees, and volunteers.
b. Cross liability and severability of interest clauses providing that the insurance applies separately to each insured except with respect to the limits of liability. c. Stipulation that the insurance is primary and noncontributory, as evidenced by a separate endorsement (CG 20 01 04 13 or an equivalent) or section of the policy, and that neither the City nor its insurers will be called upon to contribute to a loss. d. Such insurance shall specifically cover the contractual liability of the CONTRACTOR.
e. Any available insurance proceeds in e xcess of the specified minimum insurance coverage requirements and limits shall be available to the additional insureds.

Furthermore, the requirements for coverage and limits shall be: (1) the minimum coverage and limits specified in this Agreement; or (2) the full coverage and maximum limits of any insurance proceeds available to the named insureds, whichever is greater.
f. Waiver of s ubrogation endorsement.
g. The CONTRACTOR shall furnish a certificate for the period covered.

SPECIAL NOTICE - CLAIMS MADE COVERAGE:

Liability insurance coverage may not be written on a "claims made" basis. The Certificate of Insurance must clearly provide that the coverage is on an "occurrence" basis.

1. Comprehensive Automobile Liability for bodily injury (includi ng death) and property damage which provides total limits of not less than One Million Dollars ($1,000,000) combined single limits per accident, applicabl e to all owned, non-owned, and hired vehicles.

2. Statutory Workers' Compensat ion and Employer' s Liability Insurance, including a waiver of subrogation endorsement and a Broad Form "All-States " Endorsement for all employees engaged in services or operations under the Contract. The employer' s liability insurance shall provide limit s of not less than One Million Dollars ($1,000,000) per occurrence. Both the workers' compensation and employer' s liability policies shall contain 151
INS 5

the Insurer' s waiver of subrogation in favo r of the City, its offi cers, agents, employees, and volunteers.

7-1.12.2 BUILDER’S RISK/COURSE OF CONSTRUCTION INSURANCE:

The Contractor shall be responsible for all loss, damage or destruction whatsoever to the work called for by this Contract until the approval of a Notice of Completion.

The Contractor shall secure "All Risk" type of builder' s Risk Insurance of the type covering one hundred percent (100%) of the value of the wo rk performed under this Contract (the value is presumed to be the Contract amount unless otherwise stated in Supplemental Conditions) and all materials, equipment, or other items to be incorporated therein while the same are located at the construction site, a bonded warehouse, or its place of manufacture. At any time, the policy shall cover the value of the work completed. The policy shall cover hazards including the losses due to fire, explosion, hail, rain, lightning, flood (separate insurance as needed), vandalism, malicious mischief, wind, collapse, aircraft, and smoke.

The policies providing such insurance s hall name the City as a loss payee as its respective interests may appear, and certified copies of such policies shall be filed with the City.

The maximum deductible allowable under the Builder' s All Risk policy shall be five percent (5%) of the Contract amount.

Builder' s Risk Insurance is not required for co verage of losses in excess of five percent (5%) of the Contract amount fo r damages resulting from earthquak e in excess of a magnitude of 3.5 on the Richter scale, or ti dal waves. Coverage in the amount of five percent (5%) of the Contract amount for such losses is required.

7-1.12.3 OTHER INSURANCE PROVISIONS:

A. The requirements of the State Standard Specifications as to types and limits of insurance coverage to be maintained by the Contractor, and any approval of insurance by the City, are not intended to, and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract, including, but not limited to, the provisions concerning indemnification, nor preclude the City from taking any other action available to it under any other provision of the Contract or law.

B. The City acknowledges that some insurance requirements c ontained in these provisions may be fulfilled by self-insurance on the part of the Contractor. However, this shall not in any way limit liabilities assumed by Contractor under the Contract. Any self-insurance must be approved in writing by the City, in its sole discretion and shall not reduce the limits of liability. Any deductibles or self-insured retentions (“SIR”) must be declared on the certificate of insurance and approved by CITY in writing. Policies containing any SIR provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named insured or CITY. CITY reserves the right to obtain a full certified copy of any insurance policy and endorsements. The failure to exercise this right shall not constitute a waiver of such right.

C. The Contractor agrees to include in its contracts with all subcontractors the same requirements and provisions of this Contract, including the indemnity and insurance requirements, to the extent they apply to the scope of the subcontractor‟s work.

Furthermore, the Contractor shall require its subcontractors to agree to be bound to the Contractor and the City in the same manner and to the same extent as the C ontractor is bound to the City under this Contract. Additionally, the Contractor shall obligate its 152
INS 6

subcontractors to comply with these same provisions with respect to any tertiary subcontractor, regardless of tier. A copy of the City’s indemnity and insurance provisions will be furnished to the subcontractor or tertiary subcontractor upon request.

Alternatively, the Contractor may insure subcontractor(s) under its own policy.

D. The City, its officers, agents, employees, and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under California Insurance Code Section 11580.04.

E. The limits of insurance requi red in this Contract may be satisfied by a combination of primary and excess insurance. Any excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City (if agreed to in a written contract) before the City’s own insurance shall be called upon to protect it as a named insured.

F. THE CITY RESERVES THE RIGHT TO WITHHOLD ANY PROGRESS PAYMENTS

TO THE ONTRACTOR IN THE EVENT OF NONCOMPLIANCE WITH ANY INSURANCE REQUIREMENTS.

Additional Insurance Requirements:

Contractor’s pollution liability insurance. Coverage shall provide for liability arising out of sudden, accidental, and gradual pollution, and remediation. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. All activities contemplated in this agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for remediation of the site in the event of an environmental contamination event arising out of the materials, supplies, products, work, operations, or workmanship.

Transportation pollution liability insurance. Coverage shall be in an amount not less than $5,000,000 combined single limit per accident and shall include Pollution Liability (CA9948) and MCS-90 Endorsements. The policy shall provide coverage for transportation of pollutants/contaminants to and from the job site and the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.

153
1 FAITHFUL PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Goleta, has awarded to
____________________________, (hereinafter referred to as the “Contractor”) an agreement for the 2025 ARTERIAL PAVEMENT PROJECT (hereinafter referred to as the “Project”). For the purposes of this Faithful Performance Bond, the City of Goleta and Caltrans shall hereinafter be referred to as “City.”
WHEREAS, the work to be performed by the Cont ractor is more particularly set forth in the Contract Documents for the Project dated ______ __________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we , ______________________, the undersigned Contractor and ________________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ____________________ _______ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and tr uly to be made, we bind ourselves, our heirs, executors and administrators, successors and assi gns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as t herein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemni fy and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby a nd in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Do cuments, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or dam age resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herei n shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.
154
2 Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuan t to the Contract Documents, or shall promptly, at the City’s option:

Take over and complete the Project in acco rdance with all terms and conditions in the Contract Documents; or
Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contra ctor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the even t of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby sti pulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Docu ments or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.

Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

155

IN WITNESS WHEREOF, we have hereunto se t our hands and seals this _______ day of ______________, 20___.
(Corporate Seal)
Contractor/ Principal
B y
T i t l e
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. Th e total amount of premium charges is $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ________________________ ___________________ ___________________________________________
___________________________________________
(Name and Address of Agent or __________________________ _________________ Representative for service of ________________________ ___________________ process in California, if different __________________ _________________________ from above)
(Telephone number of Surety __________________________ _________________ and Agent or Representative for
service of process in California)

156

Notary Acknowledgment
A notary public or other of ficer completing this
certificate verifies only the identity of the individual who signed the document to whic h this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/a re subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED
DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. 157

Notary Acknowledgment
A notary public or other of ficer completing this
certificate verifies only the identity of the individual who signed the document to whic h this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/a re subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED
DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.

158

END OF PERFORMANCE BOND
159

LABOR AND MATERIAL PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Goleta by action taken or a resolution passed ___________________ , 20____, has awarded to ________________________ hereinafter designated as the “Principal,” a contract for the work described as follows: the 2025 ARTERIAL PAVEMENT PROJECT (the “Project”). the purposes of this Faithful Performance Bond, the City of Goleta and Caltrans shall hereinafter be referred to as “City.”; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successo rs and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code wi th respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for 160

whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
B y
T i t l e
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title

161

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the i dentity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accura cy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) w hose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJUR Y under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED
DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. 162

Notary Acknowledgment
A notary public or other officer completing
this certificate verifies only the identity of the
individual who signed the document to which this
certificate is attached, and not the truthfulness,
accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) w hose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PER JURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED
DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be co mpleted for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
163

END OF LABOR AND MATERIAL PAYMENT BOND
164

SECTION VI

CITY OF GOLETA CONSTRUCTION SPECIFICATIONS
165
GCS-1

SECTION VI

CITY OF GOLETA CONSTRUCTION SPECIFICATIONS

TABLE OF CONTENTS

Adoption of State Specifications
Section 1. Definitions and Terms GCS-2
Section 2. Proposal Requirements and Conditions GCS-3
Section 3. Contract Award and Execution GCS-6
Section 4. Scope of Work GCS-7
Section 5. Control of Work GCS-7
Section 6. Control of Material GCS-9
Section 7. Legal Relations and Responsibility GCS-9
Section 8. Prosecution and Progress GCS-21
Section 9. Measurement and Payment GCS-22

166
GCS-2

SECTION 1. DEFINITION AND TERMS
1-1.03 ACCEPTANCE. Shall mean the formal Acceptance by resolution of the Goleta City Council of an entire Contract whic h has been completed in all respects in accordance with the Plans and s pecifications and any modifica tions thereof previously approved, causing a notice of completion to be filed with the County Recorder. 1-1.13 DEPARTMENT. Shall mean the Department of Public Works of the City of Goleta, also referred to as the Department of Contract Administration. References made to the Department of Trans portation otherwise shall mean the State of California Department of Transportation.
1-1.15 DIRECTOR. Shall mean the Public Works Director or his or her duly authorized representative.
1-1.17 [Reserved]
1-1.18 ENGINEER. Shall mean the Public Works Director or his or her duly authorized representative.
1-1.19 ENGINEER'S ESTIMATE. The estimate prepared by the Public Works Director of quantities of work to be performed.
1-1.26 LIQUIDATED DAMAGE. The amount to be dedu cted from payments due or to become due to the Contractor for delay, as set forth in the Special Provisions. 1-1.29 PLANS. The official project Plans, State Standard Plans, Improvement Plans, profiles, typical cross sections, gene ral cross sections, working drawings, and supplemental drawings, or reproductions t hereof, approved by the Director which show the location, character, dim ensions and details of the work to be performed. All such documents are to be considered as a part of t he Plans whether or not reproduced in the special provisions.

In the above definition, the following terms are defined as follows:
(a) State Standard Plans – The 2018 Stan dard Plans of the Department of Transportation of the State of California.
(b) Revised State Standard Pl ans – The Revised Standard Plans of the Department of Transportation of the State of California.
(c) Project Plans – The project Plans are specific details and dimension peculiar to the work and supplemented by the State Standard Plans, insofar as the same may apply.
(d) Improvement Standards – The Impr ovement Standards and Construction Standards of the City of Goleta Department of Public Works. 1-1.30 SPECIFICATIONS. State Standard Specifications, revised standard specifications, special provisions
In the above definition, the following terms are defined as follows:
(a) State Standard Specifications – Specifications standard to Caltrans’ construction projects. These specifications are in a book titled Standard Specifications 2018. (b) Revised Standard Specifications – New or revised standard specifications. These specifications are in a section titled Re vised Standard Specifications in a book titled REVISIONS TO THE STANDARD SPECIFICATIONS 2018 dated 2018. (c) Special Provisions – Specifications specific to the project. 1-1.39 STATE.

Reference to the State or State of California shall mean City or City of Goleta unless the reference is to a law or regulation of the State.
1-1.50 CITY ATTORNEY.

The City Attorney of the City of Goleta.
167
GCS-3
1-1.51 ATTORNEY GENERAL.

The City Attorney of the City of Goleta.
1-1.52 CITY CLERK.

Shall mean the City Clerk of the City of Goleta.

SECTION 2. PROPOSAL REQUIREMENTS AND CONDITIONS

2-1.03 EXAMINATION OF PLANS, SPECIFI CATIONS, CONTRACT, AND SITE OF WORK
The bidder shall examine carefully the site of the work contemplated, the plans and specifications, and the proposal and contract forms therefor. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the general and local conditions to be encountered, as to the character, quality and scope of work to be performed, the quantities of ma terials to be furnished and as to the requirements of the proposal, plans, specifications and the contract.

The submission of a bid shall also be c onclusive evidence that the bidder is satisfied as to the character, quality and quant ity of surface and subsurface materials or obstacles to be encountered insofar as this information was reasonably ascertainable from an inspection of the site and the records of exploratory work done by the Department as shown in the bid documents, as well as from the plans and specifications made a part of the contract.

Where the Department has ma de investigations of site conditions including subsurface conditions in areas where work is to be performed under the contract, or in other areas, some of which may constitute po ssible local material sources, bidders or contractors may, upon written request, inspect the records of the Department as to those investigations subject to and upon the conditions hereinafter set forth.

Where there has been prior construction by the Department or other public agencies within the project limits, records of the prior construction that are currently in the possession of the Department and which hav e been used by, or are known to, the designers and administrators of the projec t will be made available for inspection by bidders or contractors, upon written request, subject to the conditions hereinafter set forth.

The records may include, but are not limited to, record drawings, design calculations, foundation and site studies, project reports and other data assembled in connection with the investigation, design, construction and maintenance of the prior projects.

When a log of test borings or other record of geotechnical data obtained by the Department's investigation of surface and subsurface conditions is included with the contract plans, it is furnished for the bidders' or Contractor's information and its use shall be subject to the conditions and limitations set forth in this Section 2-1.03.

When cross sections are not included with the plans, but are available, bidders or contractors may inspect the cross sections and obtain copies for their use, at their expense.

When cross sections are included with th e contract plans, it is expressly understood and agreed that the cross sections do not constitu te part of the contract, do 168
GCS-4
not necessarily represent actual site conditions or show loca tion, character, dimensions and details of work to be performed, a nd are included in the plans only for the convenience of bidders and their use is subject to the conditions and limitations set forth in this Section 2-1.03 EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK.

When contour maps were used in the design of the project, the bidders may inspect those maps, and if available, they may obtain copies for their use.

The availability or use of information described in this Section 2-1.03 is not to be construed in any way as a waiver of the provisions of the first paragraph in this Section 2-1.03 and bidders and contractors are cauti oned to make independent investigations and examinations as they deem necessary to be satisfied as to conditions to be encountered in the performance of the work and, with respect to possible local material sources, the quality and quantity of material available from the property and the type and extent of processing that may be required in order to produce material conforming to the requirements of the specifications.

The Department assumes no responsibility for conclusions or interpretations made by a bidder or contractor based on the in formation or data made available by the Department. The Department does not assume responsibility for the representation made by its officers or agents before the execution of the contract c oncerning surface or subsurface conditions, unless that representation is expressly stated in the contract.

No conclusions or interpretations made by a bidder or contractor from the information and data made available by the Department will relieve a bidder or contractor from properly fulfilling the terms of the contract.

2-1.05 PROPOSAL FORMS.

The Department will furnish to each Bidder a standard proposal form, which, when filled out and executed shall be submitted as his bid. Bids are not presented on forms so furnished will be disregarded.

The proposal form is inclu ded in these Contract Docu ments. The proposal shall set forth for each item of work, in clearly l egible figures and words, an item price and a total for the item in the respective spaces provided, and shall be signed by the Bidder, who shall fill out all blanks in the proposal form as required therein.

All items shown on schedule of bid items shall be properly filled in and shall include all costs of labor, materials, equipment, Stat e, Federal, or other taxes applicable to the transaction. The completed forms shall be without inter-lineations, erasures or alterations of any nature. If the proposal is made by an individual, hi s or her name and post office address must be shown; if made by a firm or partnership , the name and post office address of each member of the firm or part nership must be shown; or if made by a corporation, the proposal shal l show the name of the State under the laws of which the corporation was chartered and the names, titles, and business addresses of the president, secretary, and treasurer of said corporation. If the proposal is signed by an agent, a "Power of Attorney" must be filed with the proposal.

169
GCS-5
The proposal shall be submitted as dire cted in the "Notice to Contractors" and identifying the project to which the proposal relates and the time and date of the bid opening therefore. Proposals which are not properly marked may be disregarded.

Proposal forms are not transferable.

2-1.06D PROPOSAL GUARANTY.

All bids shall be presented under sealed cover and accompanied by one (1) of the following forms of Bidder' s security.

1. Cash, a cashier' s check, a certified check, or a Bidder' s bond executed by an admitted surety insurer, made payable to the City.

2. The security shall be in an amount equal to at least ten percent (10%) of the amount bid. A bid will not be considered unless one (1) of the forms of Bidder's security is enclosed with it.

3. A Bidder' s bond will not be accepted unless it conforms to a bond form approved by the City Attorney. Upon r equest "Bidder's Bond" forms may be obtained from the Department.

2-1.06G PREVIOUS DISQUALI FICATION, REMOVAL OR OTHER PREVENTION OF BIDDING.

A bid may be rejected on the basis of a Bi dder, any officer of such Bidder, or any employee of such Bidder who has a proprietary interest in such Bidder, having been disqualified, removed, or otherwise prevented from bidding on, or completing a Federal, State, or local project because of a violation of law or a safety regulation.

2-1.11 COMPETENCY OF BIDDERS.

If two (2) or more prospective Bidders desir e to bid jointly as a joint venture on a single project, they must file an affidavit of joint venture with the Bid on a form approved by the City Attorney, and such affidavit of jo int venture will be valid only for the specific project for which it is filed. If such affidavit of joint venture is not filed as aforesaid and approved by the City Attorney prior to the time for awarding bids on the specific project for which it is submitted, a joint bid submitted by said Bidders will be disregarded. No bid will be accepted from or a Contract awarded to any Bidder to whom a proposal form has not been issued pursuant to Section 2-1.05 PROPOSAL FORMS of these Specifications.

2-1.12 GUARANTY AND WARRANTY.

The Contractor shall guarantee and warrant all materials supplied as being fit for the purpose intended. The Contractor shall guarantee and warrant all work performed as having been accomplished in a proper and workman-like manner. The guarantee and warranty required by this section shall c ontinue for a period of one (1) year after Acceptance of the Work.

Should any failure of the work occur within a period of one (1) year, after Acceptance of the project by the City Council due to faulty materials, poor workmanship, or defective equipment, the Contractor shall promptly make the needed repairs at his or her expense.

The City is hereby authorized to make such repairs if the Contractor fails to make or undertake with due diligence the aforesaid repairs within ten (10) working days after 170
GCS-6
being given written notice of such failure; prov ided, however, that in case of emergency where in the opinion of the Engineer of Wo rk, providing a reasonable attempt has been made to notify the Contractor, delay would c ause serious loss or damages, or a serious hazard to the public, the repairs may be made or lights, signs, and barricades erected without prior notice to the Contractor, and the Contractor shall pay the entire cost thereof.

At the completion of the work the fait hful performance bond may be reduced at the discretion of the City Council to not less than ten percent (10% ) of the Contract price to cover said guarantee. Additional guarantees or warranties may be required by the Special Provisions.

2-1.40 WITHDRAWAL OF PROPOSALS.

Any bid may be withdrawn at any time prior to the time fixed in the public notice for the deadline submission of bids only by written request for the withdrawal of the bid filed with the Director. The request shall be executed by the bidder or his or her duly authorized representative. The withdrawal of a bid does not prejudice the right of the bidder to file a new bid. Whether or not bids are opened exactly at the time fixed in the public notice for opening bids, a bid will not be received after the deadline for submission of bids nor may any bid be withdrawn after the time fixed in the public notice for deadline for submission of bids. Immediately following the deadline for submission of bids all bids shall become the property of the City of Goleta and City is under no obligation to return.

2-1.47 BID RELIEF.

If the Bidder claims a mistake was made in his or her bid, the Bidder shall give the Department written notice within five (5) calendar days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred. No relief from a claimed mistaken bid shall be granted unless such mistake clearly appears on the face of the bid submitted to the City. Claimed mistakes on backup worksheets, spreadsheets, computerized bidding programs, or any other similar calculative bidding mistake which is not apparent on the face of the bid shall not under any circumstance be considered as a basis for relief. The burden of proving the oc currence of a mistake entitling a bidder to relief from its bid rests entirely on the bidder. Relief from bids shall be in the City’s sole discretion.

SECTION 3. CONTRACT AWARD AND EXECUTION

3-1.04 CONTRACT AWARD.

The right is reserved to reject any and all proposals. The award of the Contract, if it be awarded, will be to the lowest respons ible Bidder whose proposal complies with all the requirements prescribed. Such award, if made, will be made within ninety (90) working days after the public opening of the proposals. If the lowest responsible Bidder refuses or fails to execute the Contract, the Goleta Ci ty Council may award the Contract to the second lowest responsible Bidder. Such award, if made, will be made within one-hundred and twenty (120) working days after the public opening of proposals. If the second lowest responsible Bidder refuses or fails to execute the Contract, th e City may award the Contract to the third lowest responsible Bidder. Such award, if made, will be made within one hundred and twenty (120) working days afte r public opening of the proposals. The periods of time specified above within which the award of Contract may be made shall be subject to extension for such further period as may be agreed upon in writing between the Goleta City Counc
il and the Bidder concerned.
171
GCS-7
All bids will be compared on the basis of t he Director' s estimate of the quantities of work to be done.

3-1.05 CONTRACT BONDS.

The successful Bidder, simultaneously with the execution of the Contract, will be required to furnish a payment bond in an amount equal to one hundred percent (100%) of the Contract price, and a faithful performance bond in an amount equal to one hundred percent (100%) of the Contract price; said bonds shall be in a form approved by the City Attorney and shall be secured by a surety company satisfactory to the City Attorney. If the Contract price increases by the issuan ce of Change Orders, the Contractor shall within ten (10) working days provide a commensurate increase in the penal amounts of the bonds required.

Furthermore, the successful bidder shall furnish a certificate from the County Clerk as required by California Civil Code of Procedure Section 995.660(a)(3).

3-1.18 CONTRACT EXECUTION.

The Contract, in form and c ontents satisfactory to the City, shall be executed by the successful Bidder and retur ned, together with the Contract bonds and certificates of insurance within ten (10) cal endar days, after written notic e that the Contract has been awarded. No proposal shall be considered binding upon the City until the execution of the Contract by the City.

3-1.20 FAILURE TO EXECUTE CONTRACT.

Failure of the lowest responsible Bidder, the second lowest responsible Bidder, or the third lowest responsible Bidder to execute the Contract and file acceptable bonds and insurance as provided herein within fifteen (15) working days after such Bidder has received notice that the Contract has been awarded to him or her shall be just cause for the annulment of the award and the forfeiture of the propos al guarantee to the City as Liquidated Damages. The successful Bidder may file with the Goleta City Council a written notice, signed by the Bi dder or his or her authoriz ed representative, specifying that the Bidder will refuse to execute the Contract if presented to him or her. The filing of such notice shall have the same force and effect as the failure of the Bidder to execute the Contract and furnish acceptable bonds and in surance within the time prescribed by Section 3-1.18 CONTRACT EXECUTION of these Specifications.

SECTION 4. SCOPE OF WORK
Not used.

SECTION 5. CONTROL OF WORK

5-1 MEANS, METHODS AND APPLIANCES.

The means, methods, and appliances adopted by the Contractor shall be planned and executed to produce the highest grade quality of work and will enable the Contractor to complete the Work in the time agreed upon. The City and Engineer shall not supervise, direct, or have control over, or be responsib le for, Contractor’s means, methods, and appliances of construction or for the safety precautions and programs incident thereto, or for any failure of Contractor to comply with laws and regulati ons applicable to the furnishing or performance of Work.

172
GCS-8
5-1.04 COORDINATION OF PLANS AND SPECIFICATIONS.

These City of Goleta Construction Specifications, the State Standard Specifications, the Standard Plans, the Standard Drawings, project Plans, project Special Provisions (and any addenda), the Agreem ent, Contract Change Orders, and all supplementary documents are all essential parts of the Contract between Contractor and the City. A requirement occurring in one (1) is as binding as though occurring in all. They are intended to be complementary, and to describe and provide for a complete work.

Should it appear that the work to be done or any of the matters relative thereto are not sufficiently detailed or explained in these specifications, the Special Provisions, or the Plans, the Contractor shall apply in writing to the Director for such further explanations as may be necessary and shall conform to them as part of the Contract. In the event of any doubt or question arising respecting the true meaning of these specifications, the special provisions or the Plans, reference shall be made to the Director, whose decision thereon shall be final.

In the event of any discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct. Detail drawings shall prevail over general drawings.

5-2 CONTRACTOR’S RESPONSIBILITY FOR WORK.

Unless specified otherwise in the Contract Documents, until the formal acceptance of the Work by the City, the Contractor shall have the charge and care and shall bear the risk of damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or non-execution of the Work.

The Contractor shall rebuild, repair, re store, and make good a ll damages to any portion of the Work occasioned by any of the above causes before final acceptance and shall bear the expense, except such damages occasioned by the acts of the Federal government or acts of war.

In case of suspension of work from any cause whatsoever, the Contractor shall be responsible for the Work as previously specified and shall also be responsible for all materials delivered to the Work. Where necessary to protect the Work from damage, the Contractor shall, at its own expense, provide suitable drainage of the worksite and erect such temporary structures as necessary to protect the Work from damage during any period of suspension of work.

The Contractor shall prov ide 24-hour emergency servic e for all maintenance and operations of the Work specified and s hall supply the City with the name and phone number of the responsible per son. Contractor will respond to requests for emergency service for the Work promptly upon notification. If the Contractor fails to provide this service after notice from City, City may perform such emergency service and the cost thereof shall be deducted from the next Progress Pay Estimate due the Contractor.

173
GCS-9
SECTION 6. CONTROL OF MATERIAL

6-2.04 MATERIAL SITES.

Local material sites used by the Contractor shall be graded so that, at the time of final inspection of the Contract, they will drain and will blend in with the surrounding terrain.

SECTION 7. LEGAL RELATIONS AND RESPONSIBILITY

7-1.01 PREVAILING WAGE.

Pursuant to the provisions of California Labor Code Section 1773, the City has identified the source, stated below , of the general prevailing rate of wages applicable to the work to be done, for straight time, overtime, Saturday, Sunday and holiday work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification or type of workmen concerned.

The wage rates may be obtained from the State Department of Industrial Relations and/or the following website address:
http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm, and are a part of the Contract. "Pursuant to California Labor Code Section 1773.2, general prevailing wage rates shall be posted by the Contractor at a prominent place at the site of the work.

7-1.02 SOUND CONTROL REQUIREMENTS.

The Contractor shall additionally conform to the provisions of Goleta Municipal Code

12.02.480 Noise, Dust and D ebris where they are more restrictive than these specifications.

7-1.03 ASBESTOS.

The Contractor shall comply with all rule s, regulations, statutes and ordinances regarding asbestos removal and disposal, including but not limited to, 42 U.S.C. Sections 7401, 7412 and 7601 and 40 C.F.R. Part 61, Subpart M. If the Contractor discovers that a building to be demolished or renovated contains asbestos containing material, the Contractor shall immediately cease work and notify the City.

7-1.04 HIGHWAY CONSTRUCTION EQUIPMENT.

Pursuant to the authority contained in Vehicle Code Section 591, the Department has determined that, within such areas as are within the limits of the project and are open to the public traffic, the Contractor shall comply with all the requirements set forth in Vehicle Code Divisions 11, 12, 13, 14, and 15. Attenti on is directed to the statement in Section 591 that this section shall not relieve the Contractor or any per son from the duty of exercising due care. The Contractor shall ta ke all necessary precautions for safe operation of equipment and the protection of the public from injury and damage from such equipment.
7-1.05 CITY OF GOLETA ENCROACHMENT PERMITS.

The Contractor need not obtain a separate encroachment permit from the City prior to construction within street rights-of-way or other City rights-of-way . Execution of the Contract by the City shall be deemed an encroachment permit for work required by the 174
GCS-10
Contract within rights-of-way. All work shal l conform to the rules and regulations of encroachment permits and shall be subject to the inspection and approval of the Director. 7-1.06 CITY OF GOLETA BUSINESS LICENSE.

The Contractor shall obtain a business license from the City prior to commencing work.
7-1.07 PERMIT FOR TRENCHING OR EXCAVATION.

For trenches or excavation five (5) feet or deeper, the Contractor shall obtain from the Division of Industrial Safety, a permit authorizing such construction. 7-1.08 OTHER PERMITS.

The Contractor in coordination with the Director shall procure any necessary permits which the City is not specifically mentioned as obtaining.

7-1.09 PROJECT APPEARANCE.

The Contractor shall maintain a neat appearance to the work. In any area visible to the public, the following shall apply:

When practicable, broken concrete and debris developed during clearing and grubbing shall be disposed of conc urrently with its removal. If stockpiling is necessary, the material shall be removed or disposed of weekly. The Contractor shall furnish trash bins for all debris from structure construction. All debris shall be placed in trash bins daily.

Forms or falsework that are to be reused s hall be stacked neatly concurrently with their removal. Forms and falsework that are not to be reused shall be disposed of concurrently with their removal.

Full compensation for conforming to the prov isions in this section, not otherwise provided for, shall be considered as included in price paid for the various Contract items of work involved, and no additional compensation will be allowed therefore.

7-1.10 SAFETY.

It is the intent of the parties that the Cit y is not an exposing, creating, controlling, or correcting employer under California Labor Code section 6400. In accordance with generally accepted construction practices and State law, the Contractor shall have the authority and be solely and completely responsible for conditions on the job site, including safety of all persons and property duri ng performance of the Work. Moreover, the Contractor shall be the controlling employ er and has the authority and responsibility to enforce worksite safety. The Contractor shall be responsible for conducting daily safety inspections and assuring all hazards and viol ations are abated. The Contractor is responsible for assuring that all subcontractors adhere to the minimum CAL/OSHA safety requirements and that each subcontractor ha s an effective CAL/OSHA IIP (Illness and Injury Protection Program) in place that specifically addresses a ll potential exposures, such as, but not limited to, fall protection, confined space, and trenching/shoring. These requirements shall apply continuously and not be limited to normal working hours. The Contractor shall be responsible for any delay costs or damages in the event the progress of Work is slowed or stopped due to a safety violation.

The services of the Director in conducting construction review of the Contractor's performance is not intended to include review of the adequacy of the Contractor' s Work 175
GCS-11
methods, equipment, bracing or scaffolding, or safety measures, in, on, or near the construction site. If a City employee observes a safety violation, the City employee will report the violation to the Contractor who is then responsible for assuring the violation is abated.

The Contractor is hereby informed that Work on this project could be hazardous.

The Contractor shall carefully instruct all personnel working in potentially hazardous Work areas as to potential dangers an d shall provide such necessary safety equipment and instructions as are necessary to prevent in jury to personnel and damage to property.

Special care shall be exercised relative to Work underground.

All Work and materials shall be in strict accordance with all applicable State, City, County, and Federal Rules, Regulations, and Codes, and attention is drawn to the requirements of CAL/OSHA. The Contractor s hall be solely responsible for compliance with all City, County and State blasting requirements and for any damages caused by his or her operations.

The Contractor shall conduct its work so as to ensure the least possible obstruction to traffic and inconvenience to the general public and the residents in the vicinity of the Work and to ensure the protec tion of persons and property. No road or street shall be closed to the public except with the permission of the Director and the written approval by the proper governmental authorit y. Fire hydrants on or adjac ent to the Work shall be accessible to firefighting equipment. Temporary provisions shall be made by the Contractor to ensure the use of sidewalks , private and public dr iveways and proper functioning of gutters, sewer inlets, drainage ditches and culverts, irrigation ditches and natural water courses.

In accordance with State Labor Code Section 6705, the Contractor shall submit to the City specific plans to show details of pr ovisions for worker protection from caving ground. This in no way relieves the Contractor from the requirement of maintaining safety in all operations performed by the Contractor or the Contractor's subcontractors. The detailed Plan showing des ign of shoring, bracing, slopi ng or other provisions shall be prepared and stamped by a registered civil or structural engineer in the State of California as required. Acceptance by the City or its designated agent only constitutes acknowledgment of the submis sion and does not constitute review or approval of the designs, design assumptions or criteria, comp leteness of submission s, applicability to areas of intended use, nor implementation of the Plans, which are solely the responsibility of the Contractor and his or her registered engineer.

Notwithstanding any classifications relati ve to the Tunnel Safety Orders, Work within confined spaces on this project is subject to the definitions and applicable provisions of California Code of Regulations Section 8400 et seq., Title 8.

The Contractor shall so perform its Work as not to expose personnel to, or to discharge into the atmosphere from any source whatever, smoke, dust, asbestos, toxic chemicals or other air contaminants in violation of the laws, rules, and regulations of the governmental entities having jurisdiction. C ontractors or subcont ractors removing one hundred (100') or more square feet of asbesto s must be "Certified" in accordance with State law. All Work involving exposure to asbestos and all other hazardous materials shall 176
GCS-12
be performed with protection of personnel in compliance with all applicable regulations and safety requirements.

Nothing in these General Conditions is to be construed to permit Work not conforming to governing codes. When Contract Documents diffe r from governing codes, the Contractor shall furnish and install the higher standards called for without extra charge. All equipment furnished s hall be grounded and pr ovided with guards and protection as required by safety codes . Where vapor tight or explosion proof electrical installation is required by code, this shall be provided. In accordance with the provisions of Labor Code Section 6707, the Contract or shall provide adequate sheeting, shoring and bracing

7-1.10A CONFINED SPACES.

Confined spaces requires compliance with CAL/OSHA and Federal OSHA requirements. Confined spaces for the purposes of this Section shall be as defined by the Division of Industrial Safety. Work within confined spaces of this project is subject to the definitions and applicable provisions of Section 5156 et seq., Title 8, Division 1, Chapter 4, Subchapter 7, Group 16, Article 108 of California Code of Regulations, and Title 29 Part 1926 of the Code of Federal Regulations.

In addition the City classifies the following existing facilities as confined space:
the interior of pipelines, vaults, manholes, reservoirs and any other such structure or space which is similarly surrounded by confining surfaces as to permit the accumulation of dangerous gases or vapors. The confined spaces are “permit” confined spaces as defined by OSHA and CAL/OSHA and therefore entry is allowed only through compliance with a confined space entry permit program by the Contractor that meets the requirements of 8 C.C.R. Section 5157. While the above mentioned locations have been identified as permit confined spaces, other permit confined spaces may exist. It shall be the responsibility of the Contractor to identify and classify these confined spaces.

It is anticipated that the Contractor may encounter hazardous conditions within these permit confined spaces which include, but are not limited to the following:

a. Exposure to hydrogen sulfide, me thane, carbon dioxide and other gases and vapors commonly found in municipal sewers which could have or has the potential of having Immediate Danger to Life or Health Conditions (IDLH).

b. Exposure to atmosphere containing insufficient oxygen to support human life.

c. Exposure to combustible, flam mable and/or explosive atmosphere.

d. Exposure to sewage which may contain bacteriological, chemical and other constituents harmful to humans.

e. Work in conditions where engulfment or entrapment may occur.

f. Work in environments which may be slippery and/or have uneven work surfaces.
177
GCS-13

g. Work in structures where workers may trip, slip and/or fall several feet.

h. Exposure to an oxygen enriched environment.

7-1.11 RESPONSIBILITY FOR DAMAGE.

The City of Goleta and its officers, agents, employees, and volunteers, including but not limited to the Director, shall not be answerable or accountable in any manner: for any loss or damage that may happen to the wo rk or any part thereof; for any loss or damage to any of the materials or any things used or employed in performing the work; for injury to or death of any person, either workers or the public; or for damage to property from any cause which might have been prevented by the Contractor, his or her workers, or anyone employed by the Contractor or his or her subcontractors.

The Contractor shall be responsible for any liability imposed by law and for injuries to, or death of, any person including, but not limited to, workers and the public, or damage to property resulting from defects or obstruc tions, or from any cause whatsoever during the progress of the work or at any time before its completion and final Acceptance.

To the fullest extent allowed by law, the Contractor shall defend (through counsel acceptable to the City), indemnify, and save harmless the City of Goleta and its officers, agents, employees, and volunteers from all claims, suits, or actions of every name, kind, and description, brought forth, or on account of, injuries to or death of any person including, but not limited to, workers and the public, or damage to property resulting from the performance of the Contract, except as otherwise provided by statute.

The duty of the Contractor to defend, indemnify, and save harmless includes, but is not limited to, the duties to defend as set forth in Civil Code Section 2778.

The Contractor waives any and all righ ts to any type of express or implied indemnity against the City, its officers, agents, employees, or volunteers.

It is the intent of the parti es that the Contractor will defend, indemnify, and hold harmless the City of Goleta, its officers, agents, employees, and volunteers from any and all claims, suits, or actions as set forth above regardless of exist ence or degree of fault or negligence, whether active or passive, primary, or sec ondary, on the part of the City, the Contractor, the subcontractor or employee of any of these; except duty does not apply where the injury or damage is due to the sole or active negligence of the City.

The Contractor’s responsibility for such defense and indemnity obligations shall survive the termination or completion of this Contract for the full period of time allowed by law. The defense and indemnity obligations of this Contract are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this Contract.

The parties intend that the defense and indemnit y obligations in this Contract shall be broadly construed.

In addition to any remedy authorized by law, so much of the money due the Contractor under and by virtue of the Contract as shall be considered necessary by the City may be 178
GCS-14
retained by the City until disposition has been made of such suits or claims for damages.

The retention of money due the Contractor shall be subject to the following:

A. The City will give the Contra ctor thirty (30) working days’ notice of its intention to retain funds from any partial payment which may become due to the Contractor prior to Acceptance of the Contract. Retention of funds from any payment made after Acceptance of the Contract may be made without such prior notice to the Contractor.

B. No retention of additional amounts out of partial payments will be made if the amount to be retained does not exceed the amount being withheld from partial payments pursuant to Section 9-1.06 PARTIAL PAYMENTS of these Specifications.

C. If the City had retained funds and it is subsequently determined that the City is not entitled to be indemnified and saved harmless by the Contractor in connection with the matter for which such retention was made, the City shall be liable for interest on the amount retained at the legal rate of interest for the period of such retention.

7-1.12 INSURANCE COVERAGE.

A. Evidence of Maintenance Requi red. The Contractor shall, at all times, maintain in full force and effect at a minimum the insurance required by this section; and the Contractor shall not allow any subcont ractor to commence work until similar insurance required of the subcontractor has been obtained and filed. An original Certificate of Insurance, and copies of all required endorseme nts, all in a form approved by the Director, evidencing all required coverage or policies shall be filed after the award of the bid and prior to approval of the Contract by the City Council.

Contractor shall provide ten (10) working days prior written notice to the City of any reduction of coverage limits or cancellation of the coverage or policies shall be given to the City of Goleta as Certificate holder.

B. Qualifying Insurers. With the except ion of the State Compensation Insurance Fund, all required insurance policies shall be issued by companies licensed to do business in the State of California and who hold a current policy holders alphabetic and financial size category rating of not less than AVII according to the most recent issue of Best' s Insurance Reports.

C. Insurance Required. Commercial Gener al Liability, automob ile liability, and workers' compensation insurance shall be ma intained as follows in the insurance requirements as follows:

1. Commercial General
Liability for Minor
Construction Projects
(Projects under
$1,000,000
)
$2,000,000 each occurrence
$4,000,000 aggregate
$5,000,000.00 Umbrella or excess liability
Personal Injury: $2,000,000 each occurrence
$4,000,000 a
ggregate
179
GCS-15
$5,000,000.00 Umbrella or excess liability

Commercial General
Liability for Major
Construction Projects

(Projects over
$1,000,000)
$5,000,000 each occurrence
$10,000,000 aggregate
$25,000,000.00 Umbrella or excess liability
Personal Injury:
$5,000,000 each occurrence
$10,000,000 aggregate
$25,000,000.00 Umbrella or excess liability

The Commercial General Liability policy shall include coverage or endorsements for:

a. Completed operations.

b. Losses related to independent contractors, products and equipment.

c. Explosion, collaps e and underground hazards.

The Commercial General Liability insuranc e shall include the following, copies of which shall be provided:

a. Inclusion of the City of Goleta , and its officers, agents, employees, and volunteers, as additional insureds (except for workers‟ compensation) as respects services or operations under the Contract. The additional insured endorsement for the general liability policy shall be at least as broad as the Insurance Services Office (“ISO” ) CG 20 38 04 13 or an equivalent, blanket endorsement or section of the policy. Endorsements must include coverage for on-going and completed operations. Endorsements shall cover the City of Goleta, its officers, agents, employees, and volunteers.

b. Cross liability and severability of intere st clauses providing that the insurance applies separately to each insured except with respect to the limits of liability.

c. Stipulation that the insurance is primary and noncontributory, as evidenced by a separate endorsement (CG 20 01 04 13 or an equivalent) or section of the policy, and that neither the City nor its insurers will be called upon to contribute to a loss. d. Such insurance shall specifically cover the contractual liability of the CONTRACTOR.

e. Any available insurance proceeds in e xcess of the specified minimum insurance coverage requirements and limits shall be available to the additional insureds.

Furthermore, the requirements for coverage and limits shall be: (1) the minimum coverage and limits specified in this Agreement; or (2) the full coverage and maximum limits of any insurance proceeds available to the named insureds, whichever is greater.
f. Waiver of s ubrogation endorsement.

g. The CONTRACTOR shall furnish a certificate for the period covered. 180
GCS-16
SPECIAL NOTICE - CLAIMS MADE COVERAGE:

Liability insurance coverage may not be written on a "claims made" basis. The Certificate of Insurance must clearly provide that the coverage is on an "occurrence" basis.

Comprehensive Automobile Liability for bodily injury (including death) and property damage which provides total limits of not less than One Million Dollars ($1,000,000) combined single limits per a ccident, applicable to all owned, non- owned, and hired vehicles.

Statutory Workers' Compensation and Employer' s Liability Insurance, including a waiver of subrogation endorsement and a Broad Form "All-States" Endorsement for all empl oyees engaged in services or operations under the Contract.

The employer' s liability insurance shall provide limits of not less than One Million Dollars ($1,000,000) per occurrence. Bo th the workers' compensation and employer's liability policies shall contain the Insurer's waiver of subrogation in favor of the City, its officers, agents, employees, and volunteers.

7-1.12.2 BUILDER’S RISK/COURSE OF CONSTRUCTION INSURANCE.

The Contractor shall be responsible for all loss, damage or destruction whatsoever to the work called for by this Contract until the approval of a Notice of Completion.

The Contractor shall secure "All Risk" type of builder' s Risk Insurance of the type covering one hundred percent (100%) of the value of the work performed under this Contract (the value is presumed to be the Contract amount unle ss otherwise stated in Supplemental Conditions) and all materials, equipment, or other items to be incorporated therein while the same are located at the construction site, a bonded warehouse, or its place of manufacture. At any time, the policy shall cover the value of the work completed.

The policy shall cover hazards including the losses due to fire, explosion, hail, rain, lightning, flood (separate insurance as ne eded), vandalism, malicious mischief, wind, collapse, aircraft, and smoke. The policies providing such insurance shall name the City as a loss payee as its respective interests may appear, and certified copies of such policies shall be filed with the City. The maximum deductible allowable under the Builder' s All Risk policy shall be five percent (5%) of the Contract amount.

Builder' s Risk Insurance is not required for coverage of losses in excess of five percent (5%) of the Contract amount for damages resulting from earthquake in excess of a magnitude of 3.5 on the Richter scale, or ti dal waves. Coverage in the amount of five percent (5%) of the Contract amount for such losses is required.

7-1.12.3 OTHER INSURANCE PROVISIONS.

A. The requirements of the State Standard Specifications as to types and limits of insurance coverage to be maintained by the Contractor, and any approval of insurance by the City, are not intended to , and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract, including, but not lim ited to, the provis ions concerning 181
GCS-17
indemnification, nor preclude the City from taking any other action available to it under any other provision of the Contract or law.

B. The City acknowledges that some in surance requirements contained in these provisions may be fulfilled by self-ins urance on the part of the Contractor.

However, this shall not in any way limit liabilities assumed by Contractor under the Contract. Any self-insurance must be approv ed in writing by the City, in its sole discretion and shall not reduce the limits of liability. Any deductibles or self-insured retentions (“SIR”) must be declared on the certificate of in surance and approved by CITY in writing. Policies containing any SIR provision shall provide or be endorsed to provide that the SIR may be sa tisfied by either the named insured or CITY. CITY reserves the right to obtain a full certified copy of any insurance policy and endorsements. The failure to exercise th is right shall not constitute a waiver of such right.

C. The Contractor agrees to include in it s contracts with all subcontractors the same requirements and provisions of this Contract, including the indemnity and insurance requirements, to the ext ent they apply to the scope of the subcontractor’s work. Furthermore, the Contractor shall require its subcontractors to agree to be bound to the Contractor and the City in the same manner and to the same extent as the Contractor is bound to the City under this Contract.

Additionally, the Contractor shall obligate its subcontra ctors to comply with these same provisions with respect to any tert iary subcontractor, regardless of tier. A copy of the City’s indemnity and insur ance provisions will be furnished to the subcontractor or tertiary subcontractor upon request. Alternatively, the Contractor may insure subcontractor(s) under its own policy.

D. The City, its officers, agents, employees, and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor ; and with respect to liability arising out of work or operations performed by or on behalf of the Cont ractor including materials, parts or equipment furnished in connection with such work or operations.

Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under California Insurance Code Section 11580.04.

E. The limits of insurance required in this Contract may be satisfied by a combination of primary and excess insurance. Any e xcess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City (if agreed to in a written contract) before the City’s own insuranc e shall be called upon to protect it as a named insured.

F. THE CITY RESERVES THE R IGHT TO WITHHOLD ANY PROGRESS

PAYMENTS TO THE CONTRACTOR IN THE EVENT OF NONCOMPLIANCE WITH ANY INSURANCE REQUIREMENTS.

182
GCS-18
Additional Insurance Requirements:

Contractor’s pollution liability insurance. Coverage shall provide for liability arising out of sudden, accidental, and gradual pollution, and remediation. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. All activities contemplated in this agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for remediation of the site in the event of an environmental contamination ev ent arising out of the mate rials, supplies, products, work, operations, or workmanship.

Transportation pollution liability insurance . Coverage shall be in an amount not less than $5,000,000 combined single limit per accident and shall include Pollution Liability (CA9948) and MCS-90 Endorsements. The policy shall provide coverage for transportation of pollutants/contaminants to and from the job site and the hauling of waste fr om the project site to the final disposal location, including non-owned disposal sites.

7-1.14 ACCEPTANCE OF CONTRACT.

When the Director has made the final inspection and determines that the Contract work has been completed in all respects in accordance with the Plans and specifications, the Director will recommend that the Goleta Cit y Council formally accept the Contract, and immediately upon and after such Acceptanc e by the City, the Contractor will be responsible for the work done for a period of one (1) year.

7-1.23 NONDISCRIMINATION.

During the performance of this Contract, C ontractor and its subcontractors shall not unlawfully discriminate against any empl oyee or applicant for employment because of race, religion, color, nati onal origin, ancestry, physical handicap, medical condition, marital status, age or sex. Contractor and subcontractors shall insure that the evaluation and treatment of their employees and applican ts for employment are free of such discrimination. Contractor and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code §12900, et seq.) and the applicable regulations promulgated thereunder (California Administrative Code of Regulations, Title 2, §7285.0 et seq.) and other applicable Stat e and Federal regulations pertaining to nondiscrimination and affirmative action which are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Contractor and its subcontractors shall give written notice of t heir obligations under this claus e to labor organizations with which they have a collective bargaining or other agreement.

Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the agreement."

Nondiscrimination
Under 2 CA Code of Regs § 11105:

1. During the performance of this contra ct, the recipient, co ntractor, and its subcontractors shall not deny the contract's benefits to any person on the basis of race, religious creed, color, national orig in, ancestry, physical disability, mental disability, medical condition, genetic informat ion, marital status, sex, gender, gender 183
GCS-19
identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, nati onal origin, ancestry, physical disability, mental disability, medical c ondition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free of such discrimination.

2. Contractor shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code, § 12900 et seq.), the regulat ions promulgated thereunder (Cal. Code Regs., tit. 2, § 11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code (Gov. Code, §§ 11135-11139.5), and the regulations or standards adopted by the awarding state agency to implement such article.

3. Contractor or recipient shall permit access by representatives of the Department of Fair Employment and Housing and the awarding state agency upon reasonable notice at any time during the normal business hours, but in no case less than 24 hours' notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or Agency shall require to ascertain compliance with this clause.

4. Recipient, contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

5. The contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.

Under 2 CA Code of Regs § 11122:

STANDARD CALIFO RNIA NONDISCRIMINATION CO NSTRUCTION CONTRACT SPECIFICATIONS (GOV. CODE SECTION 12990)
These specifications are applicable to all st ate contractors and subcontractors having a construction contract or subcontract of $5,000 or more.

1. As used in the specifications:
a. "Act" means the Fair Em ployment and Housing Act.
b. "Administrator" means Administrator, Office of Compliance Programs, California Department of Fair Employment and Housing, or any person to whom the Administrator delegates authority;

2. Whenever the contract or or any subcontractor subcontracts a portion of the work, it shall include in each subcont ract of $5,000 or more the nondiscrimination clause in this contract directly or through incorporation by reference.

3. The contractor shall impl ement the specific nondiscrimi nation standards provided in paragraphs 6(a) through (e) of these specifications.

4. Neither the provisions of any collect ive bargaining agreement, nor the failure by a union with whom the contractor has a co llective bargaining agreement, to refer members of any group protected by the Act shall excuse th e contractor's obligations under these specifications, Government Code section 12990, or the regulations promulgated pursuant theret o.5. In order for the nonw orking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor dur ing the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their

training, subject to the availability of employment opportunities . Trainees must be 184
GCS-20
trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations.

5. In order for the nonworki ng training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their tr aining, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations.

6. The contractor shall take specific acti ons to implement its nondiscrimination program.

The evaluation of the contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The contractor must be able to demonstrate fully its efforts under steps a. through e. below:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and at all facilities at which the contract or's employees are assigned to work. The contractor shall specifically ensure that all foremen, superintendents, and other on- site supervisory personnel are aware of and carry out the contractor's obligations to maintain such a working environment. b. Provide written notificati on within seven (7) working da ys to the director of the DFEH when the referral process of the union or unions with which the contractor has a collective bargaining agreement has impeded the contractor’s efforts to meet its obligations.
c. Disseminate the contractor’s equal em ployment opportunity policy by providing notice of the policy to unions and training, recruitment and outreach programs and requesting their cooperation in assisting the contractor to meet its obligations; and by posting the company policy on bulletin boards accessible to all employees at each location where construction work is performed.
d. Ensure all personnel making management and employment decisions regarding hiring, assignment, layoff, termination, conditions of work, training, rates of pay or other employment decisions, including all supervisory personnel, superintendents, general foremen, on-site foremen, etc., are aware of the co ntractor’s equal employment opportunity policy and obligations, and discharge their responsibilities accordingly.
e. Ensure that seniority pr actices, job classifications , work assignments, and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the equal employment opportunity policy and the c ontractor’s obligations under these specifications are being carried out.

7. Contractors are encouraged to participate in voluntary asso ciations that assist in fulfilling their equal employm ent opportunity obligations. T he efforts of a contractor association, joint contractor-union, contra ctor-community, or other similar group of which the contractor is a member and par ticipant, may be asserted as fulfilling any one or more of its obligations under these specifications provided that the contractor actively participates in the group, makes ev ery effort to assure that the group has a positive im
pact on equal employment opportunity in the industry, ensures that the concrete benefits of the pr ogram are reflected in th e contractor’s workforce participation, and can provide access to documentation that demonstrates the effectiveness of actions taken on behalf of the contractor. The obligation to comply, however, is the contractor’s.
185
GCS-21

8. The contractor is requir ed to provide equal employment opportunity for all persons.

Consequently, the contractor may be in violation of the Fair Employment and Housing Act (Government Code section 12990 et seq.) if a particular group is employed in a substantially disparate manner.

9. The contractor shall no t use the nondiscriminat ion standards to discriminate against any person because race, religious creed, co lor, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expr ession, age, sexual orient ation, or military and veteran status.

10. The contractor shall not enter into any subcontract with any person or firm decertified from state contracts pursuant to Government Code section 12990.

11. The contractor shall carry out such s anctions and penalties for violation of these specifications and the nondiscrimination cl ause, including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered pursuant to Government Code section 12990 and its impl ementing regulations by the awarding agency. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Government Code section 12990.

12. The contractor shall designate a responsible official to monitor all employment related activity to ensure that the company equal employment opportunity policy is being carried out, to submit reports relating to t he provisions hereof as may be required by OCP and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction tr ade, union affiliation if any, employee identification number when assigned, status, (e.g., mechanic, apprentice trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in any easily understandable and retrievable form; however, to the degree that existing records satisfy this requirem ent, contractors shall not be required to maintain separate records.

7-1.24 CONTRACTOR REGISTRATION.

Registration‟ is added as follows: No contractor or subcontractor may work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. During the performance of this Contract, Contractor and its subcontract ors shall have a continuing le gal obligation to maintain current registration with the D epartment of Industrial Relati ons. Contractor is hereby notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.”

SECTION 8. PROSECUTION AND PROGRESS

8-1.03 BEGINNING OF WORK.

The Contractor shall begin work within fifteen (15) working days from the date of a “Notice to Proceed” letter, and the Contractor shall thereafter diligently prosecute the work to completion.

The Contractor shall notify the Director, in writing, of his or her intent to commence work at least seventy-two (72) hours befor e work is begun. The notice shall specify the date on which the Contra ctor intends to begin work. If a project has more than one (1) location of work, a separate notice shall be given for each location. 186
GCS-22
Should the Contractor begin work in advanc e of issuance a “Notice to Proceed,” any work performed in advance of such issuance shall be considered to have been done at Contractor’ s own risk and as a volunteer.

8-1.15 WASTE REDUCTION.

All procurements for Compost, Mulch, and Paper Products made on behalf of the City must comply with Goleta Municipal Code Chapter 8.10.900 “Procurement Requirements for City Departments, Direct Service Providers, and Vendors” a. All paper products and content prin ting and writing paper shall consist of at least thirty percent (30%) by fiber weight post-consumer fiber; and b. All compost and mulch products must be purchased from a processing facility that does not solely utilize chip and grind methods to produce either product; and
c. All proof of purchase records including weight tickets, receipts, invoices shall be provided to city project manager in a timely manner; and d. Contractor shall work with city project manager to submit all required procurement records to the Environmental Services Division.

All covered projects must comply with Goleta Municipal Code Chapter 8.10 Article IV “Mandatory Recycling of Construction and Demolition Waste” including but not limited to:
a. Complete and submit a Certificat ion of Implementation and submit to Director—five (5) working days before construction begins. b. Receive an approved Certificat e of Implementation from the Environmental Services Division
c. Manage and track all project materials as well as waste generated to achieve greater than or equal to sixty-five percent (65%) diversion through waste reduction, reuse, and recycling; and
d. Collect all weight tickets and ot her records associated with project materials as well as waste generated and provide records to designated city project manager in a timely manner; and
e. At least five (5) working days prio r to final inspection/project closeout, complete and submit a Post-Construction Waste Reduction & Recycling Summary Report (WRRS) to Environmental Services Manager (or designee) including the WRRS form, weight tickets, and other relevant records.

SECTION 9. MEASUREMENT AND PAYMENT

9-1.05 STOP PAYMENT NOTICES.

The City may, at its option and at any time, retain amounts due to the Contractor, sums sufficient to cover claims (including co sts and attorney' s fees), filed pursuant to California Civil Code Section 9350 et seq.

9-1.06 PARTIAL PAYMENTS.

The City, once in each month, shall cause an estimate in writing to be made by the Engineer. The estimate shall include the to tal amount of work done and acceptable materials furnished, provided the acceptable materials are listed as eligible for partial payment as materials in the special provis ions and are furnished and delivered by the Contractor on the ground and not used or are furnished and stored for use on the contract, 187
GCS-23
if the storage is within the State of Calif ornia and the Contractor furnishes evidence satisfactory to the Engineer that the material s are stored subject to or under the control of the Department, to the time of the estimate, and the value thereof. The estimate shall also include any amounts payable for mobilization. Daily extra work reports furnished by the Contractor less than five (5) working days before the preparat ion of the monthly progress estimate shall not be eligible for payment until the following month's estimate.

The amount of any material to be considered in making an estimate will in no case exceed the amount thereof which has been reported by the Contractor to the Engineer on forms properly filled out and executed, including acco mpanying documentation as therein required, less the amount of the material incorporated in the work to the time of the estimate. Only materials to be incorporated in the work will be considered. The estimated value of the material established by the Engineer will in no case exceed the contract price for the item of work for which the material is furnished.

The Department shall retain five percent (5%) of such estimated value of the work done and five percent (5%) of the value of materials so estimated to have been furnished and delivered and unused or furnished and stored as aforesaid as part security for the fulfillment of the Contract by the Contractor.

The Department shall pay m onthly to the Contractor, while carrying on the work, the balance not retained, as aforesaid, after deducting ther efrom all previous payments and all sums to be kept or retained under t he provisions of the contract. No monthly estimate or payment shall be required to be made when, in the judgment of the Engineer, the work is not proceeding in accordance with the provisions of the contract.

No monthly estimate or payment shall be construed to be an acceptance of any defective work or improper materials.

Attention is directed to the prohibitions and penalties pertaining to unlicensed contractors as provided in Business and Professions Code Sections 7028.15(a) and 7031.

9-1.065 PAYMENT OF WITHHELD FUNDS.

Except as otherwise prohibit ed by law, the Contractor may elect to receive all payments due under the Contract pursuant to Section 9-1.06 of these Specifications without any retention. If the Contractor so elects, a deposit with the City of securities with a value equivalent to the re tention that would otherwise be withheld by the City shall be made. Said security shall be as provided in California Public Contract Code Section 22300 and shall be approved by the City both as to sufficiency and form. In the alternative, the Contractor may elect to deposit such securities in an escrow account and enter into a standard form Public Works Retention Release/Escrow Agreement. Blank Agreements are available from the Public Works Director and the City Attorney' s Office.

9-1.10 ARBITRATION.

Arbitration is not permitted.

9-1.11 CLAIMS FOR EXTRA COMPENSATION FOR DELAYS.

It is understood and agreed by the City and the Contractor that the Contractor will incur overhead costs for temporary facilities, superintendence, home office overhead, and 188
GCS-24
similar cost items, and that the costs of such overhead for the full Contract period through the specified completion date are included in the Contractor's lump sum bid amounts included in his accepted Proposal. No add itional compensation will be made to the Contractor for claims of increased overhead costs occurring within the originally specified construction Contract period plus any time extensions granted by Change Order. No compensation for extended performance will be granted unless the delay exceeds more than half of the float time available at the time of the delay."

9-1.12 DISPUTES
DISPUTES. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a proce ss utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to reso lve disputes on construction claims. The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

CLAIMS. For purposes of this Section, “Claim” means a separate demand by CONTRACTOR, after a change order duly requested in accordance with the terms of this Contract has been denied by the CITY, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of CONTRACTOR pursuant to the Contract, or (C) an amount the payment of which is disputed by the CITY. A “Claim” does not include any demand for payment for wh ich CONTRACTOR has failed to provide notice, request a change order, or otherwise failed to follow any procedures contained in the Contract Documents. Cla ims governed by this Section may not be filed unless and until CONTRACTOR completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order pr ocedures contained herein, and CONTRACTOR’s request for a change has been denied in whole or in par t. Claims governed by this Section must be filed no later than fourt een (14) calendar days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the CITY and s hall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing in this Section is intended to extend the time limit or supersede notice requi rements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra Work, disputed Work, and/or changed conditions. Fa ilure to follow such contractual requirements shall bar any claims or subs equent lawsuits for compensation or payment thereon.

Supporting Documentation. The CONTRACTOR shall subm it all claims in the following format:

Summary of claim merit and price, refe rence Contract Document provisions pursuant to which the claim is made
List of documents relating to claim:

Specifications
Drawings
Clarifications (Requests for Information)
Schedules
189
GCS-25
Chronology of events and correspondence
Analysis of claim merit
Analysis of claim cost
Time impact analysis in CPM format
Other

If CONTRACTOR’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, CONTRACTOR shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.

Cover letter and certification of validity of the claim, including any claims from subcontractors of any tier, shall be in a ccordance with Government Code section 12650 et seq.

CITY’S RESPONSE. Upon receipt of a claim pursuant to this Section, CITY shall conduct a reasonable review of the claim and, within a period not to exceed forty-five (45) calendar days, shall provide CONTRACTOR a written statement identifying what portion of the claim is disputed and what porti on is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within sixty (60) working days after the public entity issues its written statement.

If CITY needs approval from City Council to provide the CONTRACTOR a written statement identifying the dis puted portion and the undisputed po rtion of the claim, and the City Council does not meet within the forty-five (45) working days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, CITY shall have up to three working days following the next duly publicly noticed meeting of the City Council after the forty-five (45) working-day period, or extension, expires to provide CONTRACTOR a written statement identifying the disputed portion and the undisputed portion.

Within thirty (30) working days of receip t of a claim, CITY may request in writing additional documentation supporting the claim or relating to defenses or claims CITY may have against the CONTRACTOR. If additional info rmation is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of CITY and the CONTRACTOR.

CITY’s written response to the claim, as further documented, shall be submitted to CONTRACTOR within thirty ( 30) working days (if the claim is less than $50,000, within fifteen (15) working days) after receipt of the further documentation, or within a period of time no greater than that taken by CONTRACTOR in producing the additional information or requested documentation, whichever is greater.

MEET AND CONFER. If the CONTRACTOR disputes CITY’s written response, or CITY fails to respond within the time prescribed, the CONTRACTOR may so notify CITY, in writing, either within fifteen (15) calendar days of receipt of CITY’s response or within fifteen (15) calendar days of CITY’s failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, CITY shall schedule a meet and confer conference within thirty (30) calendar days for settlement of the dispute. 190
GCS-26

MEDIATION. Within ten (10) working days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, CITY shall provide the CONTRACTOR a written statement identif ying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the clai m shall be processed and made within sixty (60) working days after CITY issues its written statemen t. Any disputed portion of the claim, as identified by CONTRACTOR in writing, shall be submitted to nonbinding mediation, with CITY and CONTRACTOR sharing the associated costs equally. CITY and CONTRACTOR shall mutually agree to a mediator within ten (10) working days after the disputed portion of the claim has been identifi ed in writing unless the parties agree to select a mediator at a later time.

If the Parties cannot agree upon a mediator, each Party s hall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each Party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists t he Parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

Unless otherwise agreed to by CITY and CONTRACTOR in writing, the mediation conducted pursuant to this section shall e xcuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

The mediation shall be held no earlier than the date CONTRACTOR completes the Work or the date that CONTRACTOR last performs Wo rk, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation unless a new unrelated claim arises after mediation is completed.

Procedures After Mediation. If following t he mediation, the claim or any portion remains in dispute, CONTRACTOR must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purpo ses of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time CONTRACTOR submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation.

CIVIL ACTIONS. The following procedures are established for all civil actions filed to resolve claims subject to this Section:

Within sixty (60) calendar days, but no ea rlier than thirty (30) calendar days, following the filing or responsive pleadings, the court shall submit the matter to non- binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Publ ic Contract Code section 9204 and the terms of these procedures. The mediation process shall provide for 191
GCS-27
the selection within fifteen (15) calendar days by both parti es of a disinterested third person as mediator, shall be commenced within thirty (30) calendar days of the submittal, and shall be concluded within fifteen (15) calendar days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, not withstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.

In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, CONTRACTOR must comply with the claim procedures set forth in Government C ode sections 900 et seq. prior to filing any lawsuit against the CITY. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by CONTRACTOR. If no such Government Code claim is submitted, or if any prerequisite contractual requireme nts are not otherwise satisfied as specified herein, CONTRA CTOR shall be barred from bringing and maintaining a valid lawsuit against the CITY. A Government Code claim must be filed no earlier than the date the work is completed or the date CONTRACTOR last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

9-1.17 PAYMENT AFTER ACCEPTANCE.

Final Payment shall be made in accordance with this section. The Contractor shall, after the completion of the Contract, submit a final estimate of the amount of work done thereunder and the value of such work. Upon appr oval of the estimate by the Director, the City of Goleta shall pay the entire su m so found to be due after deducting therefrom all previous payments and a ll amounts to be kept and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and pay ment. The final payment shall not be due and payable until the expiration of th irty-five (35) working days from the date of Acceptance of the work by the City Council, and thirty-five (35) calendar days after filing of the Notice of Completion with the County of Santa Barbara.

No certificate given or payments made under the Cont ract, except the final certificate or final payment, shall be conc lusive evidence of the performance of the Contract, either wholly or in part, and no payment (inclu ding the final payment) or certificate shall be construed to be an Acceptance of any def ective work or improper 192
GCS-28
materials. Final payment shall not release the Contractor from one (1) year guarantee of the work as provided in Section 7-1.14 ACCEPTANCE OF CONTRACT and Section 2-

1.12 GUARANTEE AND WARRANTY of these Specifications.

END OF CITY OF GOLETA CONSTRUCTION SPECIFICATIONS

193

SECTION VII

SPECIAL PROVISIONS

194

CITY OF GOLETA
BOOK 2 OF 2

SPECIAL PROVISIONS
FOR
2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NUMBER: N/A
Received By:
_________________________
Luz Buelna, P.E.

Public Works Director
The Engineers whose stamp and signature appear
herein are in responsible charge of preparing these
plans and specifications.

BID NUMBER: 24-XX
BID OPENING: 3:00 P.M., TUESDAY, APRIL 8, 2025
195
ii

THIS PAGE WAS LEFT INTENTIONALLY BLANK – BACK OF COVER

196
iii

CITY PROJECT NO. N/A

The Special Provisions contained herein have been prepared by or under the direction of the following Registered Persons.

CIVIL

_________________________________________
Paul K. Mateo, PE
Senior Principal Engineer
Pavement Engineering, Inc.

197

PAGE TOC-4

TABLE OF CONTENTS
SPECIAL PROVISIONS .................................................................................................. 1 SCOPE OF SPECIAL PROVISIONS ............................................................................. 1 DIVISION I GENERAL PROVISIONS ........................................................................ 3 1 GENERAL ..................................................................................................................... 3 2 BIDDING ........................................................................................................................ 7 3 CONTRACT AWARD AND EXECUTION ............................................................... 9 4 SCOPE OF WORK ...................................................................................................... 11 5 CONTROL OF WORK .............................................................................................. 13 6 CONTROL OF MATERIALS ................................................................................... 24 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC .................... 28 8 PROSECUTION AND PROGRESS .......................................................................... 37 9 PAYMENT .................................................................................................................... 53 DIVISION II GENERAL CONSTRUCTION .............................................................. 66 10 GENERAL ................................................................................................................. 66 13 WATER POLLUTION CONTROL ........................................................................ 74 14 ENVIRONMENTAL STEWARDSHIP .................................................................. 75 15 EXISTING FACILITIES ......................................................................................... 84 DIVISION III EARTHWORK AND LANDSCAPE .................................................. 88 17 GENERAL ................................................................................................................. 88 19 EARTHWORK .......................................................................................................... 89 20 LANDSCAPE ............................................................................................................. 92 DIVISION IV SUBBASES AND BASES ..................................................................... 95 198

PAGE TOC-5
30 RECLAIMED PAVEMENT .................................................................................... 95 DIVISION V SURFACINGS AND PAVEMENTS ..................................................... 99 37 BITUMINOUS SEALS ............................................................................................. 99 39 ASPHALT CONCRETE ......................................................................................... 108 DIVISION IX TRAFFIC CONTROL DEVICES ..................................................... 127 84 TRAFFIC STRIPES AND PAVEMENT MARKINGS ....................................... 127 DIVISION XI MATERIALS ....................................................................................... 131 90 CONCRETE ............................................................................................................ 131 APPENDIX A ................................................................................................................. 137 STANDARD DRAWINGS AND DETAILS ............................................................... 137 APPENDIX B ................................................................................................................. 138 WATER POLLUTION CONTROL PLAN ................................................................ 138 APPENDIX C ................................................................................................................. 139 PREVAILING WAGE RATES .................................................................................... 139 APPENDIX D ................................................................................................................. 140 SCHOOL ZONE WORK HOUR RESTRICTION MAP ......................................... 140 APPENDIX E ................................................................................................................. 141 C48 (CA) SIGN DETAIL .............................................................................................. 141 APPENDIX F ................................................................................................................. 142 MONUMENT PERPETUATION REPORT .............................................................. 142

199

PAGE TOC-6

THIS PAGE WAS LEFT INTENTIONALLY BLANK
200
2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SN-1

SPECIAL NOTICES

 Attention is directed to Section 9-1. 03 PAYMENT SCOPE of the State Standard Specifications: "Full compensation for work specified in Divisions I, II, and XI is included in the payment for the bid items unless:

1. Bid item for the work is shown on the Bid Item List

2. Work is specified as change order work
201

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-1

SPECIAL PROVISIONS

FOR THE

CITY OF GOLETA
2023 PAVEMENT REHABILITATION PROJECT

SCOPE OF SPECIAL PROVISIONS

The work described in these Special Provisions shall be performed in conformance with the latest editions of the 2018 State Stan dard Specifications and the mo st current Revised Standard Specification dated Apri l 15, 2022. Standard Special Provisi ons, and Plans, Ci ty of Goleta Construction Specifications, City of Goleta Design and Construction Standards, Change Orders using the 2018 State Standard Specif ications and Revised Standard Specifications, Standard Special Provisions, and Plans, except insofar as these Special Provisions may modify them.

Numbering in these Special Provisions conforms to that in the State Sta ndard Specifications. The existence of a Section in these Special Provisions means that the corresponding Section in the State Standard Specifications is modified in some respect. Unless otherwise specified, the modified State Standard Specification Provisions are deleted entirely, and the provisions of these Special Provisions are substituted.

The construction materials, payments, etc., for items of work shown in the proposal and on the plans, but not specifically mentioned in these Special Provisions are referred to the State Standard Specifications for conformance.

DISCREPANCIES AND OMISSIONS
Any discrepancies or omissions found in the Contract Documents shall be reported to the Engineer immediately. The Engineer will clarify discrepancies or omissions, in writing, within reasonable time.

In resolving inconsistencies among two or more Sections of the Contract Documents, precedence shall be given in the following order:

1. Change Orders using the 2018 State Standard Specificati ons and Revised Standard Specifications, Standard Special Provisions, and Plans

2. Addenda

3. The Agreement

4. Special Provisions upon Specifications

5. Plans shall govern in matte rs of quantity and measurement

6. Specifications govern in matters of quality

7. Profile Plans govern upon Layout Plans

8. Specific Notes shall gove rn over other/general notes

9. Larger scale drawings shall govern within smaller scale ones

10. Detail plans govern over State Standard Plans

11. Figured or numerical dimensions govern over dimens ions obtained by scaling.

12. 2018 State Standard Specific ations and Revised Standard Specifications, Standard Special Provisions, and Plans

13. City of Goleta Construction Specifications
202

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-2

14. County of Santa Barbara Engineering Design Standards

15. Where provisions of codes, safety orders, Contract Documents, referenced manufacturers’ specifications or industry standards are in conflict, the mo re restrictive and higher quality shall govern.

16. Addenda shall take precedence over all Sections referenced therein. Figure dimensions on Drawings shall take precedence over general Drawings.

ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the State Standard Specifications. A main-section heading is a heading shown in the table of contents of the State Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the State Standard Specifications as revised by any revised standard specification.

Any paragraph added or deleted by a revision cl ause does not change the paragraph numbering of the State Standard Specifications for any other reference to a paragraph of the State Standard Specifications.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

203

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-3

DIVISION I GENERAL PROVISIONS
1 GENERAL

Add to section 1-1.06:

NOC Notice of Completion
NTP Notice to Proceed
(P) Partial Payment
RSS Revised Standard Specif ication dated April 15, 2022 QA quality assurance
QC quality control
UAS unmanned airc raft systems
SF Square Feet
SY Square Yards

Add or replace the various items of Section 1-1.07:

Whenever in the State St andard Specifications, Special Provisions, Notice to Contractors, Proposal, Contract, or other contract documents, the following te rms are used, the intent and meaning must be interpreted as follows:

Agency: City of Goleta
Allowance: “Allowance” shall mean an amount of money set aside under the Contract for a special purpose identified and defined in the Contract Documents. See Section 2-1.09A MANDATORY CITY REQUIRED ALLOWANCES.

State: California Department of Transportation or City of Goleta to be interpreted by the Engineer Department: City of Goleta
Director: City of Goleta Public Works Director
District: The Public Works Department, City of Goleta
When a submittal is to be made to METS or to OSD, submit the items to the Engineer unless otherwise noted.

Engineer: The Director of Public Works, City of Goleta , acting either directly or through properly authorized agent or consultants.

Final Completion: The date when the Work is 100% co mplete, including completion and acceptance of all punch list corrections, as built submittal, operation and maintenance manuals, warranty checklist, and plant establishment, as certified by the Engineer.

References to the Bidder’s Exchange means the City of Goleta References to Notice to Bidders means Notice to Contractors 204

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-4
References to the Department's Certification Program fo r Suppliers of Asphalt means Caltrans’ Certification Program for Suppliers of Asphalt.

References to the Department’s Construction Site Best Manage ment Practices (BMP) Manual means Caltrans’.

References to the Department’s Construction Site Monitoring Program (CSMP) Guidance Manual means Caltrans’.

References to the Department’s Dispute Resolution Advisor Candidates List refers to Caltrans’.

References to the Department’s Division of Construction Website means Caltrans’.

References to the Department’s Falsework Manual means Caltrans’ manual.

References to the Department’s Field Guide for Construction Site Dewatering means Caltrans’.

References to the Department's Field Guide to Partnering on Caltrans Construction Projects means Caltrans’.

References to the Department’s Materials Plant Quality Program means Caltrans’.

References to the Department's Partnering Facilitator Standards and Expectations means Caltrans’.

References to the Department’s Quality Control Manual for Hot Mix Asphalt Production and Placements means Caltrans’.

References to the Department’s Soil and Rock Logging, Classification, and Presentation Manual means Caltrans’.

References to the Department’s Storm Water Pollution Prevention Plan (SWPPP) and Water Pollution Control Plan means the project SWPPP.

References to the Department's Traffic Operations Website means Caltrans’ website.

References to the Department's Transportation Permits Manual means the Department’s.

References to the Department’s Value Analysis Team Guide means Caltrans’.

References to Geotechnical Services website means Caltrans’ Website.

References to Geotechnical Services means the Engineer.

References to the METS Website means the Caltrans METS Website.

Replace the following glossary terms in Section 1-1.07B with:

Authorized Laboratory: Independent testing laboratory (1) not employed or compensated by any subcontractor or subcontractor’s affiliate providing other services for the Contract and (2) authorized by Caltrans.

Bid Item List: List of bid items and the associated quantities. The verified Bid Item List is the Bid Item List with verified prices. The Contract Proposal of Low Bidder is the verified Bid Item List.

After Contract award, interpret a reference to the Bid Item List as a reference to the verified Bid Item List.

California Test: Caltrans-developed test for determining wo rk quality. For California Tests, go to the METS Web site.
205

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-5
Department: City of Goleta
Director: City of Goleta Public Works Director
Engineer: The Director of Public Works, City of Goleta, acting either directly or through properly authorized agent or consultants.

Material Source Facility Audit: Self-audit and a Caltrans audit evaluating a facility’s capability to consistently produce materials that comply with Caltrans standards.

Plans: State Standard plans, revised standard plans, and project plans.

1. State Standard Plans: The 2018 Standard Plans of the D epartment of Transportation of the State of California.

2. Revised Standard Plans: The Revised Standard Plans of the Department of Transportation of the State of California dated 04-15-22.

3. Project Plans: Drawings specific to the project, including authorized shop drawings Schedule:

1. Baseline Schedule: Initial schedule showing the original work plan starting on the date of Contract approval. This schedule shows no completed work to date and no negative float or negative lag to any activity.

2. Updated Schedule: Current schedule developed from the accepted baseline and any subsequent accepted update schedules through regular monthly review to incorporate actual past progress.

Specifications: State Standard Specifications, revised standard specifications, special provisions

1. State Standard Specifications: Specifications standard to Caltrans’ construction projects.

These specifications are in a book titled Standard Specifications 2018.

2. Revised Standard Specifications: New or revised standard specifications. These specifications are in a sect ion titled Revised Standard Specifications in a book titled REVISIONS TO THE STANDARD SPECIFICATIONS 2018 dated 04-15-22.

3. Special Provisions: Specifications specific to the project.

Structure Design: City of Goleta Department of Public Works Add to Section 1-1.07B:

Caltrans: California Department of Tr ansportation as defined in St. & Hwy Code section 20 and authorized in St. & Hwy Code section 90; its authorized representatives.

Office Engineer: City of Goleta
Project biologist: A USFWS-approved biologist provided by the City

Replace row 12 in the table in the 1st paragraph of Section 1-1.08 Districts, with:
1750 E 4TH ST 1750 E 4 TH ST
12 Oran ge (Ora) STE 100 STE 100

SANTA ANA CA SANTA ANA CA
92705-3909

206

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-6
Replace the 9th row in the table of Section 1-1.11 Websites, Addresses, and Telephone Numbers, with:

Department of
Conservation,
Division of
Mine
Reclamation
http://www.conservation.ca.gov/
dmr
--

-
-

In addition to Section 1-1.11 Websites, Addresses, and Telephone Numbers, the following shall apply:

Authorized
ADSC
Standard
Mitigation
Plan
https://dot.ca.gov/-/media/dot-
media/programs/engineering/d
ocuments/20201214-
caltransapprovedadscstandar
dmiti
gationplan-a11y.pdf

--

--
Data
Interchange
for Materials
Engineering
https://dime.dot.ca.gov

MATERIALS

ENGINEERING AND

TESTING SERVICES

DEPARTMENT OF

TRANSPORTATION
5900 FOLSOM BLVD

SACRAMENTO CA
95819-4612

(916)
227-
5238
Division of
Safety:

MASH
devices
https://do
t.ca.gov/programs/safe
ty- programs/mash -- --
SWRCB,
Land
Disposal
Pro
gram
https://www.waterboards.ca.go
v/water_issues/programs/land_
disposal/w
alist.html

--

--

1-1.12 MISCELLANEOUS
Make checks and bonds payable to the City of Goleta.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

207

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-7
2 BIDDING
Add to Section 2-1.01:
2-1.01 GENERAL
The bidder’s attention is directed to the provisions in Section 2, “Bidding”, of the Standard Construction Specifications for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Add to Section 2-1.03:
2-1.03.1 OBTAINING PLANS AND SPECIFICATIONS
All Contract Documents and the Proposal Forms for bidding this project, may be obtained at PlanetBids at http://www.planetbids.com/. The service requires that the Contractor establish a username and password in order to download and/or order plans and specifications.

Replace Section 2-1.05 with:
2-1.05 CONFLICT OF INTERESTS
In conformance with Public Contract Code Section 7106, a Noncollusion Affidavit is included in the Bid Book. Signing the Bid Book shall also constitute signature of the Noncollusion Affidavit.

The Contractor, sub-recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of Title 49 CFR (Code of Federal Regulations), Part 26 in the award and administration of US DOT-assist ed contracts. Failure by the C ontractor to carry out these requirements is a material breach of this contra ct, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate. Each subcontract signed by the bidder must include this assurance.

Replace Section 2-1.06A with:
2-1.06A GENERAL
The requirements specified in of the State Standard Specifications shall be replaced as follows:

Bids must be submitted to the City of Goleta’s Planet Bids portal as outlined in the Notice to Contractors and shall be submitted no later than the date and time of public submittal of proposals as specified in the Notice to Contractors. Any addend a to these Special Provisions or other contract documents shall be acknowledged where indicated.
2-1.06.A(1) Questions
Questions shall be submitted in writing to http://www.planetbids.com/ no later than (5) five working days prior to the bid o pening. Questions submitted after t he above listed deadline will not be addressed and will be returned to the Contractor. The City will respond in writing to the questions (3) three working days prior to the bid opening.

Add to Section 2-1.10:
208

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-8
2-1.10.1 REQUIRED LISTING OF SUBCONTRACTORS
The bidder’s attention is directed to other provisions of said Act related to the imposition of penalties for a failure to observe its provisions by using unauthorized Subcontractors or by making unauthorized substitutions.

A sheet for listing the Subcontractors, as required herein, is included in the Proposal.

Add to Section 2-1.34:
2-1.34 WARRANTY BOND
The Contractor shall execute and submit a comp leted Warranty Bond provide by the City for the Project. The Warranty Bond shall be submitted prior to the Notice of Completion date.

Nothing in the Contract Documents shall be construed to limit, relieve or release the Contractor’s, subcontractor’s and/or equipment supplier’s liability to the City for damages sustained as the result of latent defects in the equipment furnished or work performed. Further, nothing in the Contract Documents shall be deemed to be a wa iver by the City of any rights or remedies, or time limits in which to enforce such rights or remedies, that it may have against the Contractor, subcontractors, suppliers of the equipment and work performed under the Contract Documents.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
209

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-9
3 CONTRACT AWARD AND EXECUTION
The bidder's attention is directed to the provisions in Section 3 CONTRACT AWARD AND EXECUTION of the State Standard Specifications and these Special Provisions.

Add to Section 3-1.01:
3-1.01 AWARD OF CONTRACT
The award of contract, if it is to be awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed.

The project has been set up using a Base Bid format. The City of Goleta shall determine the lowest responsible, responsive bidder based on the lowest total of the Base Bid plus the Allowances. The City of Goleta, if it chooses to award, shall award the contract to the lowest responsible, responsive bidder based on the lowest total of the Base Bid plus the allowances. Depending on budget constraints, the actual project may, at the City’s discretion, include items from only the Base Bid. The Contract or must submit pricing for all Base Bid items and add the City’s Allowances and shown in the Bid Items. No response or a response of zero on any bid items will be deemed a non-responsive bid.

Allowances are for bidding purposes only. The allowances may be extended, reduced, or deleted at the discretion of the Engineer, with no change in the unit bid price.

The bidder's attention is directed to the provisions in Section 3 CONTRACT AWARD AND EXECUTION of the State Standard Specifications and these Special Provisions for the requirements and conditions concerning award and execution of contract.

Bid protests shall be submitted as outlined in the Notice to Contractors.

The contract shall be executed by the successful bidder and shall be returned, together with the contract bonds, to the Agency so that it is received within ten (10) working days after the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty. The executed contract documents shall be delivered to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117.

Replace Section 3-1.18 with:

3-1.18 CONTRACT EXECUTION
Attention is directed to Book 1 “Bid Book”. The successful bidder must sign the Contract.

Deliver to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117.

1. Signed Contract

2. Contract bonds
. Documents identified in Section 3-1.07

4. A Form 1273 Certification from every subcontractor
210

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-10
The Engineer must receive these documents before the 10th working day after the bidder receives the contract.

The bidder's security may be forfeited for failure to execute the contract within the time specified (Pub Cont Code §§ 10181, 10182, and 10183).

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

211

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-11
4 SCOPE OF WORK
Add to Section 4-1.01:
4-1.01 GENERAL
The project consists of placement of HMA pavement materials such as HMA mill and fill; pulverizing, treating, removal, and disposal of the HMA roadway section; replacement and compaction of subsurface material; construction of PCC curb ramps, curbs & gutters, and placement of crushed aggregate base and HMA pavement. The work includes but is not limited to traffic control and erosion control.

Add to Section 4-1.05:
4-1.05C SIGNIFICANT CHANGES IN THE CHARACTER OF WORK

1. The Engineer reserves the ri ght to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the cont ract nor release the surety, and the contractor agrees to perform the work as altered.

2. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such al terations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated prof it, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.

3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contra ct, the altered work will be paid for as provided elsewhere in the contract.

4. The term “significant change” shall be construed to apply only to the following circumstances:
 When the character of the work as alte red differs materially in kind or nature from that involved or included in the original proposed construction; or  When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.

Add to Section 4-1.06:
4-1.06 DIFFERING SITE CONDITIONS (23 CFR 635.109)
In addition to Section 4-1.06 DIFFERING SI TE CONDITIONS (23 CFR 635.109) of the State Standard Specifications the following shall apply. 212

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-12
During the progress of the work, if subsur face or latent physical conditions are encountered at the site differing materially fr om those indicated in the contract or if unknown physical conditions of an unusual nat ure, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, t he party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.

Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly.

The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.

No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice.

The Contractor will be allowed ten (10) working days from the notification of the Engineer's determination of whether or not an adjustment of the contract is warranted, in which to file a notice of potential claim in conformance with the prov isions of Section 5-

1.43 POTENTIAL CLAIMS AN D DISPUTE RESOLUTION of the State Standard Specifications and as specified herein; other wise the decision of t he Engineer shall be deemed to have been accepted by the Contract or as correct. The notice of potential claim shall set forth in what respects the Contractor's position differs from the Engineer's determination and provide any additional info rmation obtained by the Contractor. The notice of potential claim shall be accompanied by the Contractor 's certification that the following were made in preparation of the bid: a review of the contract, a review of the "Materials Information,", and an examination of the conditions above ground at the site.

Supplementary information, obtained by the C ontractor subsequent to the filing of the notice of potential claim, shall be submitted to the Engineer in an expeditious manner.

Add to Section 4-1.13:
4-1.13 CLEAN UP
In addition to the requirements of Section 4-1.13 CLEANUP of the State Standard Specifications, the following shall apply:

The Contractor shall remove all temporary pavement delineation.

Prior to submitting the final payment request, the Contractor shall remove all reference markings (i.e. USA markings, striping reference points, utility reference points) placed during the course of work.

Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items and no additional compensation will be allowed therefor.
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

213

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-13
5 CONTROL OF WORK
Replace Section 5-1.05 with:
5-1.05 ORDER OF WORK

The Contractor shall prepare a traffic control plan that conforms to Section 12, Temporary Traffic Control of these Special Provisions.

The work shall be performed in conformance with the phases of construction shown on the Contractor's Traffic Control Plan. Non-conflicting work in subsequent phases may proceed concurrently with work in preceding phases.

The first order of work shall be potholing.

The Contractor to contact Underground Service Alert (U.S.A.) and to verify the location of all utilities in the vicinity of project area. The Contractor shall verify the size, location (horizontal and vertical) to t he satisfaction of the Engineer and utility representatives as outlined in section 19-1.01A(1) POTHOLE UTIL ITIES of these Spec ial Provisions. The Contractor shall provide t he pothole information within the time frame outlined in 19-

1.01A(1) POTHOLE UTILITIES. The Contractor shall notify the Engineer five (5) working days prior to commencing potholing within the project area. The Contractor’s attention is directed to section 19-1.01A(1) POTHOLE UTILITIES, in these Special Provisions.

In addition, the Contractor shall pothole utilities adjacent to the proposed light poles prior to ordering any equipment. After it is determi ned that the light pole locations shown on the plans avoid utilities, Contractor to place the order for the light pole equ ipment. The Engineer shall be furnished a statement from t he vendor that the order for the light pole equipment has been received and accepted by the vendor.

Replace Section 5-1.07 with:
5-1.07 SUPERINTENDENCE
The Contractor shall designate in writ ing before starting wo rk, an authorized representative who shall have the authority to represent and act for the Contractor. When the Contractor is comprised of 2 or more persons, firms, partnerships or corporations functioning on a joint venture basis, the Cont ractor shall designate in writing before starting work, the name of one authorized representative who shall have the authority to represent and act for the Contractor.

The authorized representative sha ll be present at the site of the work at all times while work is actually in progress on the contract. When work is not in progress and during periods when work is suspende d, arrangements acceptable to the Engineer shall be made for any emergency work which may be required. Whenever the Contractor or the Contractor's authorized represent ative is not present on any particular part of the work where it may be desired to give direction, orders will be given by the Engineer, which shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which the orders are given. Any order given by the Engineer, not otherwise required by the specifications to be in writing, will on request of the Contractor, be given or confirmed by the Engineer in writing. 214

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-14

Replace Section 5-1.08 with:
5-1.08 INSPECTION
All work is subject to inspection and approval by the Engineer. The Contractor shall notify the Engineer, along with all affected utility companies, two (2) working days in advance of the start of work to coordinate and schedule inspection staff.

The City will provide one (1) inspection and one (1) resident engi neering cost on 8-hour day and 40-hour week basis only excluding desig nated City, State, or Federal holidays.

The Contractor shall reimburse the City in the amount of $185.00 per hour for the actual cost of all inspection and $250 per hour for Resident Engineer cost in excess of the hours of work specified here, outlined in the lane closure charts, and working hours or inspection performed during designated City, State, or Federal holidays. Designated City holidays are listed in Section 8-1.04A “Construction Working Hours.”

The Contractor shall provide a competent person during normal working hours to assist the Engineer, when required, in checking the Contractor’s layout and for measuring quantities for payment purposes. The Contract or shall cooperate wit h the Engineer so that checking and measuring may be accomp lished with the least interference to the Contractor’s operations.

No additional compensation will be made to the Contractor for fulfilling these requirements.

Add to the end of Section 5-1.09A:

The Department encourages the project team to exhaust the use of partnering in dispute resolution before engagement of an objective third party.

For certain disputes, a facilitated partner ing session or facilitat ed dispute resolution session may be appropriate and effective in clarifying issues and resolving all or part of a dispute.

To afford the project team enough time to plan and hold the session, a maximum of twenty (20) working days may be added to the Dispute Resolution Board referral time following the Engineer's response to a Supplemental Potential Claim Record.

To allow this additional referral time, the project team must document its agreement and intention in the dispute reso lution plan of the partnering c harter. The team may further document agreement of any associated criteria to be met for use of the additional referral time.

If the session is not held, the DRB referral time remains in effect as specified in Section 5-1.43 POTENTIAL CLAIMS AND DISPUTE RESOLUTION.

215

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-15
Add to the end of Section 5-1.13:
5-1.13 SUBCONTRACTING
In addition to the requirements of Sect ion 5-1.13 SUBCONTRAC TING of the State Standard Specifications, and in accordance with the requireme nts of Section 4100 to 4113, inclusive, of the Government Code, each bidder shall list in his proposal the name and business address of each Subcontractor to whom the bidder proposes to subcontract all or a portion of the work. Said list shall include a description of the portion of the work which will be done by each Subcontractor. A s heet for listing the Subcontractor’s, as required, is included in the proposal.

Add to Section 5-1.16:
5-1.16 REPRESENTATIVE
In addition to the requirements of Sect ion 5-1.16 REPRESENTATIVE of the State Standard Specifications, the Co ntractor must have a repres entative onsite at all times while work is in progress that has decision making authority.

Add to Section 5-1.23:

The Contractor is required to use Co nstruction Management In formation System Software (CMIS) for all project documents and submittals, at the Contractor’s expense.

5-1.23A GENERAL
In addition to the requirement of Section 5-1.23A GENERAL the following shall apply:

REVIEW TIMEFRAME:

1. Except as may be provided in techni cal specifications, a submittal will be returned as specified in the State Standard Specifications.

2. When a submittal cannot be returned within the specified period, Engineer will, within a reasonable time after receipt of the submittal, give notice of the date by which that submittal will be returned.

3. The Engineers acceptance of pr ogress schedule containing submittal review times less than those specified or agreed to in wr iting by Engineer will not constitute Engineer’s acceptance of review times.

4. Critical submittals:
a) Contractor will not ify Engineer in writing that timely review of a submittal is critical to the progress of Work.

5. The Engineer will provide decision on request.
a) Written acceptance of request.
b) Written agreement by E ngineer to reduce submittal review time will be made only for unusual situations.
c) Written rejection of request.

SUBMITTAL REVIEW COSTS:

1. The City’s cost for review of submi ttals for the same proposed materials, equipment or work shall be apportioned as follows:
a. The cost of review of the initial submittal and the first revised submittal 216

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-16
will be borne by the City.
b. The cost to review all additional re vised submittals after the first revised submittal will be charged to the Contra ctor at $500 per submittal. The cost of review shall include, without limitation, administrative, design and engineering activities directly related to review of submittals. c. If a submittal is approved and the Contractor elects to submit an alternate item for review for the same application, the Contractor shall be responsible for the review costs for the alternate submittal at $500 per submittal. The cost of review shall include, wi thout limitation, administrative, design and engineering activities directly related to review of submittals.

Delete item 2 in the list in the 3rd paragraph of section 5-1.23B(2).

Add to Section 5-1.23B(2):

Each PDF e-mail attachment must not exceed 25 MB in size. The e-mail message must not exceed 50 MB in size.

Each electronic e-mail submission must:

1. Be in PDF format

2. Have a resolution of at least 300 dpi

3. Contain the following info rmation in the subject line:

3.1. "Shop Drawing Submittal"

3.2. Contract number

3.3. Bid item number

3.4. If separate e-mails are needed to accomm odate large files, indicate the total number of e-mails included in the submittal

4. List each PDF file and its number of pages

Use the following naming convention for PDF files the Contractor submits:

For shop drawings:

Contract number_Specification Number_Bid item number_Submittal Name Example: 12-345678_1-12_123_XXX.PDF

If submittal of more than 1 copy or set of shop drawings or calculations is specified, submit only 1 electronic copy.

After submitting the Contractor’s electronic files, send a notif ication of the Contractor’s electronic submittal to the Engineer. Include the names of the submitted files.

Upon completion of review, the City returns 1 electronic copy with the date of authorization.

Add to Section 5-1.24
CONTRACTOR’S DAILY REPORTS

The Contractor shall maintain daily job repor ts recording all significant activity on the project, including number of workers on site, names and job classification of employees, 217

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-17
active construction equipment used, notable deliveries, work activities, delays, interruptions or any problems encountered.

The Contractor shall submit a Contractor ’s Daily Report form, for approval by the Engineer, to record this information and submit this form to the Engineer no later than the following morning for the previous work day. If this is not submitted on time, the City shall withhold $500/day until this report is turned in.

If there is no work performed on any given day, the Contractor shall note the reasons for no work and submit a daily report to the Engineer on those days also.

Failure to stay current with daily reporting will be just cause for the Owner not processing a progress payment until reports are submitted.

Add to Section 5-1.25:
5-1.25 RECORD DRAWINGS
The Contractor shall maintain a neat and a ccurate marked set of record drawings showing the final locations and layout of roadways, piping and conduit; structures; and other facilities. Maintain record drawings electronically on a Bluebeam Studio Project and grant access to the Engineer. Dr awings shall be kept current weekly, with all work instructions and change orders, and construction adjustments. Drawings shall be subject to the inspection of the Engineer at all times and progress payments, or portions thereof, may be withheld if drawings ar e not accurate and current. Pi pe material shall be added to drawings, if not denoted on contract drawings. Prior to acceptance of the work, the Contractor shall deliver to the Engineer one set of neatly marked record drawings accurately showing the information required above.

Record drawings shall be submitted and appr oved by the Engineer in accordance of these Special Provisions.

Full compensation for conforming to the requirements of this Section shall be considered as included in the prices paid for the various contract items and no additional compensation will be allowed therefore.

5-1.26 CONSTRUCTION SURVEYS:

Contractor shall provide the necessary horizontal and vertic al survey control for the completion of the work. A Licensed Land Surv eyor or a Registered Civil Engineer must perform survey work.

Control must be provided for site grading, signi ficant layout, or as directed by Engineer.

Control must be provided in the same system of units as shown. Contractor shall provide surface grade control every fifty (50) f eet and at grade breaks and begin and end of curves. Contractor shall mark the control points in the field and provide a printed sheet with the point information, site layout, and control point layout to Engineer.

If working within twenty-four (24) inches of a survey monument or benchmark, Contractor shall employ a Licensed Land Surveyor or a Registered Civil Engineer to tie-out the monument or bench mark. Should any existi ng survey monument be disturbed or 218

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-18
destroyed during construction, it must be rese t at the previous location. Should any existing benchmark be disturbed or destroyed during construc tion, a new one must be set at a nearby, but differ ent, location than the existing, as determined by Engineer.

Monuments and benchmarks must be set by a Li censed Land Surveyor or a Registered Civil Engineer properly licensed to complete survey work. City reserves the right to review the Land Surveyor or Engineer's license to determine its validity. For monuments, a Corner Record must be filed with the C ounty and a copy delivered to Engineer. For benchmarks, documentation of the bench mark and how it was reset must be delivered to Engineer prior the project acceptance or sign off of the Encroachment Permit.

Damaged or disturbed property corners must be replaced by a Land Surveyor at Contractor’s expense.

If the area of removal has had r oots or other materials removed, the void shall be filled with aggregate base, sand or native materials as appropriate. 5-1.26A SCOPE
Monument preservation tasks shall comply with Sections 8771 and 8772 of the Land Surveyor’s Act effective January 1, 2012. Under Section 8771 monument preservation tasks are required at two stages of the improvement projec t; pre-construction and post- construction. A Monument Perpetuation Report has been prepared and will be provided by the City.

A. Pre-Construction

All monuments within the work area outlined on the projec t drawings that control the location of subdivisions, tracts, boundar ies, roads, streets, or highways, or provide horizontal or vertical survey control shall be referenced and documented in the following manner:

1. Monuments found during the field inspection shall be located and referenced, at least one week prior to start of construction, by or under the direction of a licensed land surveyor or registered civil engineer legally authorized to practice land surveying. A minimum of 4 reference points per survey monument shall be set. Refer ence points shall be in compliance with Sections 8771 (a) and 8772 of the Land Surveyor’s Act in terms of durability, location, and identificat ion of the Licensed Land Surveyor, Registered Civil Engineer or public agency. Upon completion and no later than one week prior to construction, the project surveyor shall provide written notice to the City Surveyor stating the monuments have been located and referenced. An example can be provided by the City upon request.

2. A Corner Record or Record of Survey of the monuments and reference points shall be prepared and submitted to the City Surveyor for preliminary review. The Corner Record or Record of Survey shall incorporate the City Surveyor’s revisions, if any, and be filed with the County Surveyor. The project surveyor shall provide proof of submittal to the County via transmittal or similar documentation. An example can be provided by the City upon request.
219

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-19
B. Post-Construction

1. A field inspection shall be conducted to identify all monu ments (including reference points set in the pre-construction phase) destroyed or disturbed by the improvement project. Monuments and reference points identified as destroyed/disturbed shall be reset in t he surface of the new construction and affected monument wells be reconstructed in a manner approved by the City Surveyor. Reference points s hall be in compliance with Sections 8771 (a) and 8772 of the Land Surveyor’s Act in terms of durability, location, and identification of the Licensed Land Surveyor, Registered Civil Engineer or public agency.

2. A Corner Record or Record of Survey of the monuments and reference points shall be prepared and submitted to the City Surveyor for preliminary review. The Corner Record or Record of Survey shall incorporate the City Surveyor’s revisions, if any, and be filed with the County Surveyor. The project surveyor shall provide proof of submittal to the County via transmittal or similar documentation.
5-1.26B PAYMENT
Measurement and Payment for “Monument Perpetuation (Allowance)” will be paid as an Each item and includes all costs to perform the required work. Payment for this item shall only be made on an allowance basis and only for the work completed. The Contract shall have no claim to that portion of the allowance which is not necessary for the project.

Payment for these items does not include the cost of adjusting survey monument boxes, which is covered under another section.

Replace Section 5-1.28 of the RSS with:
5-1.28 PROJECT SAFETY SUPERVISOR AND REVIEWS
Contractor’s assigned project safety supervisor must perform and document project safety reviews with the Engineer:

Safety Supervisor – The Contractor shall appoint an employee as safety supervisor who is qualified and authorized to supervise and enforce compliance with the Safety Program. The Contractor shall notify th e Engineer in writing prior to the commencement of work of the name of the person who will act as the Contractor’s safety supervisor and furnish the safety supervisor's resume to the Engineer.

Contractor will, through and with its Safety Supervisor, ensure that all of its employees and its Subcontractor s of any tier, fully comply with the Project Safety Policies/Plan. The Safety Supervisor shall be a full-time employee of the Contractor whose responsibility shall be for supervising compliance with applicable safety requirements on the Project site and for developing and implementing safety training classes for all job personnel. The City shall have the authority to require removal of the Contractor’s Safety Supervisor if the representative is judged to be improperly or inadequately performing the duties; however, this authority shall not in any way affect the Contractor’s sole responsibility for performing this work safely, nor shall it impose any obligation upon the City to ensure the Contractor performs its work safely. 220

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-20
Safety and Protection – Contractor shall ta ke all necessary precautions to prevent damage, injury, and loss to:

1. All employees on the Project, empl oyees of all subcont ractors, and other persons and organizations who may be affected thereby;

2. All the Work and materials and equi pment to be incorporated therein, whether in storage on or off the site; and

3. Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, wetlands, pavements, roadwa ys, structures, utilities, and underground facilities not designated for removal, relocation, or replacement in the course of construction.

Contractor shall comply with all applicable laws and regulations of any public body having jurisdiction for the safety of persons or property or to protect them from damage,
injury or loss and shall erect and maintain all necessary safeguards for such safety and protection. The Contract or shall notify owners of adjacent property and of underground facilities and utility districts when prosecution of the Work may affect them and shall cooper ate with them in the protecti on, removal, relocation, and replacement of their property. All injury or loss to any property caused, directly or indirectly, in whole or in part, by the Contractor, any subcontractor, supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or any one for whose acts any of them may be liable, shall be remedied by the Contractor.

Replace Section 5-1.29 of the RSS with:
5-1.29 JOB HAZARD ANALYSES
The requirements specified in of the State Standard Specifications shall be replaced as follows:

Safety Program – The Contractor shall establish, implement, and maintain a written injury prevention program as required by Labor Code Section 6401. 7 and CA Code of Regs § 3203(a)(4) and 1511(b). Before beginning the Work , the Contractor shall file with the Engineer a written Contractor Safety Program that provides for the implementation of all of the Contractor’s safety responsibilities and a job hazard analysis in connection with the Work at the Project site and the coordination of that program and its associated procedures and precautions with safety progra ms, precautions and procedures of each of its Subcontractors and other Contractors performing work at the Project site. The Contractor shall be solely responsible for initiating, maintaining, monitoring, coordinating, and supervising all safety programs, prec autions, and procedures in connection with the Work and for coordinating its programs, precautions, and procedures of the other Contractors and Subcontractors performing the Work at the Project site. The Safety Program should contain all the ne cessary elements for the Contractor to administer its program on the Project site. At a minimum, this written Safety Program shall address the elements required by Labor Code Section 6401.7 an d CA Code of Regs § 3203(a)(4).
221

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-21
Submit each job hazard analysis as an informational submittal. Each job hazard analysis must identify the following:

1. Work activity description

2. Existing and predictab le hazards associated with the work activity

3. Hazard control measures, pr eventative, or corrective actions to be taken for the work activity
Submit each job hazard analysis at least five (5) working days before the start of a work activity. During the project safety review s required under Secti on 5-1.28, discuss job hazard analyses for active work activities and work activities planned to start within five (5) working days.

Submit a revised job hazard analysis when equipment or methods change results in a change to the hazards previously identified. Submit a revised job hazard analysis within one working day of the identified change.

Add to Section 5-1.32
Section 5-1.32 AREAS FOR USE:

Personal vehicles of the Contractor’s employees must not be parked on the traveled way or shoulders, including sections closed to traffic.

Add to Section 5-1.36
5-1.36 PROPERTY AND FACILITY PRESERVATION
In addition to Section 5-1.36 PROPERTY AND FACILITY PRESERVATION of the State Standard Specifications the fo llowing shall apply. Contractor shall protect existing pavement, striping, manholes, ut ilities, sidewalks, curbs, gut ter, curb ramps, valley gutters, and driveways at all equipment crossings. The Contractor shall provide materials to shore and brace excavation areas in order to prevent existing structures, private properties and permanent improv ements from failure or dam age during construction. If requested, provide shor ing design calculations and details for review by the Engineer.

Damage to existing structures, private pr operties, and permanent improvements due to construction work conducted by the Contractor shall be restored to existing or better condition with no additional cost to the City.

Add to the list in the RSS of section Section 5-1.36A:

12. Existing hardscape

13. Retaining walls

14. Trees, shrubs, other plants

15. Irrigation facilities

Replace Reserved in Section 5-1.36C(2) with:
222

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-22
The Contractor is responsible for the care and protection of all materials and equipment until the completion and final acceptance of the work.

The Contractor shall provide protection to the project site against trespass, vandalism, or theft during the Maintenance Period. Any damage caused by the lack of adequate site protection shall be repaired or replaced at no additional cost to the City. 5-1.43 POTENTIAL CLAIMS AND DISPUTE RESOLUTION
In addition to the requirement outlined in section 5-1.43 Potential Claims and Dispute Resolution the City shall follow Caltrans’s dispute resolution process.

Replace the 2nd paragraph of Section 5-1.46 with:

Immediately following the dat e the Engineer reports to the City Council as work completed, the Contractor is relieved from:

Add to the end of Section 5-1.46:

A list of the remaining items (a punch list) will be prepared by the Engineer and given to the Contractor.

All punch list items shall be completed during the contract period. Failure to do so will not be considered an occasion of unavoidable delay. When all items have been completed to the satisfaction of the Cit y Engineer, the project will be subm itted to the City Council, which may accept the completed work.

The Contractor shall be responsible for re storing the proposed staging areas, the temporary access road, and any other areas temporarily im pacted during construction evaluation to the work prior to the start of work. The project will not be accepted by the City until these areas are restored in kind to the satisfaction of the permits and acceptance of the Engineer. Before any work has begun, Contractor shall review the staging areas and access road with the Engineer to document their existing conditions.

Any paved areas shall be replaced with a struct ural section equal to or greater than the adjacent paved structural sections.

Any vegetated areas shall be replaced to its existing condition using planting similar to the adjacent undisturbed planting or as directed by the Engineer.

The costs for restoring of staging areas and access roads shall be included in the various items of work associated with this project and no separate payment will be made.

Add to Section 5-1.47:
5-1.47 GUARANTEE
The Contractor hereby agrees to make, at it s sole expense, all repairs or replacements necessitated by defects in materials or workmanship, supplied under terms of the Contract Documents, and pay for any damage to other works resulting from such defects, which becomes evident within one (1) year after the date of acceptance of the Project as evidenced by the Notice of Completion recor ded by the City. Unless otherwise provided 223

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-23
in Contract Documents, the one (1) year warranty period is the shortest duration and such duration may be a longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by t he Contract Documents. The Contractor further assumes responsibility for a similar guarantee for all work and materials provided by subcontractors or manufacturers of packaged equipment components. The Contractor also agrees to indemnify, defend, and hold the City harmless from liability of any kind arising from damage due to said defects. The Contractor shall repair failed areas in full, from lane line to lane line. All work done on failed areas shall be done in accordance with these Special Provisions and as directed by the engineer.

The Contractor shall, upon the receipt of notice in writing from the City, promptly make all repairs arising out of defective materials, workmanship, or equipment. The City is hereby authorized to make such repairs, and the Contractor and its Surety shall be liable for the cost thereof, if fifteen (15) working days after the City givi ng of such notice to the Contractor, the Contractor has failed to make or undertake the repairs with due diligence.

In case of emergency, where in the opinion of the City delay could cause serious loss or damage, repairs may be made wit hout notice being sent to the Contractor, and the expense in connection therewith shall be charged to the Contractor, and/or its Surety shall be liable for the cost thereof.

Prior to the expiration of the warranty period, the City reserves the right to hold a meeting and require the attendance of the Contractor. The purpose of the meeting is to review warranties, bonds and maintenance requirem ents and determine required repair or replacement of defective items. For the pu rpose of this paragra ph, acceptance of the Work or a portion of the Work by the City, shall not extinguish any covenant or agreement on the part of the Contractor to be performed or fulfilled under this Contract which has not, in fact, been performed or fulfilled at the time of such acceptance. All covenants and agreements shall continue to be binding on the Contractor until they have been fulfilled.

Nothing in the Contract Docu ments shall be construed to limit, relieve or release the Contractor’s, subcontractor’s and/or equipment supplier’s liability to the City for damages sustained as the result of la tent defects in the equipment furnished or work performed.

Further, nothing in the Contract Documents s hall be deemed to be a waiver by the City of any rights or remedies, or time limits in which to enforce such rights or remedies, that it may have against the Contractor, subcontractors, suppliers of the equipment and work performed under the Contract Documents.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

224

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-24
6 CONTROL OF MATERIALS
Add to Section 6:

In addition to the requirem ents of Section 6 CONTROL OF MATERIALS of the State Standard Specifications, the following shall apply:

Material testing for this project will be provided by the Contractor as set forth in Section 6 CONTROL OF MATERIALS of t he State Standard Specifications and the most current City of Goleta’s Quality Assurance Program. The Contractor shall perform all testing to verify compliance with the Specifications of any and all materials furnished by the Contractor. The Contractor s hall submit and receive the Engineer’s approval of all compliance test results prior to incorporatin g materials into the pr oject. The Contractor may elect to place material without the approved certificates of compliance and mix designs and shall be at the Contractor’s own risk. The Contractor shall notify the Engineer in writing to get the approval of plac ement, and $10,000.00 will be withheld from the Contractor’s progress payment for each certificate of co mpliances and mix designs until the certificate of compliances and mix designs are submitted approved.

Samples, certificates of comp liance, lists of materials and material sources, access to facilities, requests for testing and all other data relating to material testing shall conform to Section 6 of the State Standard Specifications, “Control of Materials.” Contractor shall provide the Engineer with five (5) working days’ notice of the need for material testing.

Section 6-1.01 GENERAL
Unless otherwise authorized by the Engineer, the substantiation of offers of equivalency must be submitted at the pre-construction meeting.

In the event Contractor furnishes any “or equal” material more expensive than that specified in the bid form, the difference in cost of such material so furnished will be borne by Contractor under Public Contract Code Section 3400.

Along with information supplied by the Contractor regarding equivalency of the proposed item, the Contractor shall clearly identify all deviations from the specified item.

Deviations discovered by the Engineer after acceptance of an "or equal" item which were not identified by the Contractor with the submittal shall be cause for rejection of the "or equal" item. Contractor shall be due no additional compensation in time or money for either acceptance or rejection of a proposed "or equal" item and subsequent replacement with the item specified. Contractor shall pay cost to City for analysis of any submittals which requires more than a general review of an "or equal" item. Changes that result from the Contractor’s use of “or equal” items shall be the sole responsibility of the Contractor and he shall bear all time and cost impacts to the project. “Or equal” products may be accepted by the Engineer upon submittal of the following information:

1. Product Date Design Criteria

2. Physical Properties Limitations of Process

3. Material Specifications List of Previous Projects

4. Installation Specifications Size of Completed Projects 225

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-25

5. Testing Methods List of Current Projects

6. Third Party Test Data

7. Size of Current Projects

8. References (All references must in clude current names and telephone numbers)

9. List of all deviations from the specif ications or referenced product or materials Additional testing may be required, and all costs for testing shall be borne by the Contractor.
6-2 QUALITY ASSURANCE
In addition to the requirements of Sect ion 6-2 QUALITY ASSURANCE of the State Standard Specifications, the following shall apply:

Specific quality control requirements for the Work are indi cated throughout the Contract Documents. The requirements of this Section are primarily related to performance of the Work beyond furnishing of manufactured produc ts. The term "Quality Control" includes inspection, sampling and testing, and associated requirements.

1. Quality Control: All those planned and specified actions or operations necessary to produce a product or service that will meet requirements for quality as specified. Quality Control is the responsibility of the Contractor. The Contractor will monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

2. Quality Assurance: Those planned and systematic operations conducted to ensure that the operations and/or products incorporated into the project meet the project specifications. Quality Assurance encompasses oversight of the Contractor’s Quality Control; verifying the results of Contractor testing; review of sampler, tester and laboratory qualifications; independent assurance sampling and testing, and inspection for conformance with the plans and specifications. Quality Assurance is the responsibility of the Contractor and Engineer.

3. Special Tests and Inspections: Test s and inspections required by the CBC and performed by certified inspectors. These tests will be performed and paid for by the City.

Quality Control Program:

1. Contractor shall develop a detailed written Quality Control (QC) Program for all Work required in the Contract Documents. The Contractor must submit for the Construction Manager’s acceptance the Contractor’s Quality Control Program (QC Program) for the entire Project before beginning any of the Work other than mobilization tasks to install temporary facilities. Except for mobilization, no other work will begin until the Engineer has accepted the Contractor’s overall QC Program for the project. This QC Program must meet the objectives and requirements as defined herein. The QC Program must be specific to this Project and the Contract Documents.
226

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-26

2. In addition, the Contractor must s ubmit for the Engineer’s acceptance the Contractor’s individual QC Plans before starting each area or division of the Work and/or new specialty trade to complete any portion of the Work. Work will be permitted to start only after the Construction Manager reviews and accepts Contractor's individual QC Plan. The individual QC Plans must identify all QC personnel, procedures, inspections, laboratories, Testing equipment calibrations and certifications, tests, inspection/test hold points, instructions, sampling and testing records organized by date and type of material, reports, records, schedules, etc. specific for each area or division of the Work and/or new specialty trade to complete any portion of the Work.

3. Contractor shall appoint a full time Quality Control Officer who will have the sole responsibility for the full-time oversight, implementation, and monitoring of the QC Program on this one project. Contractor shall maintain a log of required testing indicating the tests or sampling and test method required, location, frequency and responsibility.

4. Contractor shall provid e written procedures defining methods of construction, control measures, and the performance of inspections and testing for the different types of Work.

5. Procedures shall detail “Hold Points,” where Work shall not proceed until the required Quality Control functions are performed and documentation shows the Work meets the requirements of the Contract.

6. Procedures shall detail problem resolution steps and corrective actions in the event the Work does not meet the Contract Specifications.

7. Procedures shall be provided for all major activities of Work.

8. Contractor shall mainta in evidence of activities affecting quality, including operating logs, records of inspections and tests, audit reports, material analyses, personnel qualification and certification records, procedures, and document review records.

9. Quality records shall be maintained in a manner that provides for timely retrieval, and traceability. Quality records shall be protected from deterioration, damage, or destruction.

10. Within 24 hours, notify the Engineer of any noncompliance identified by your QC program. The Contractor shall provide the City access to all QC records.

11. Submit QC test data and QC test results within two (2) working days of test completion.

Sampling and Testing

1. Unless otherwise indicated, all products, materials, and equipment shall be subject to inspection by the Engineer at the place of manufacture as specified in the CSSS.

2. The City or an independent firm retained by the City will perform inspections, testing, and other services as required by the Engineer. a. The Contractor shall cooperate with the Engineer or independent firm 227

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-27
and furnish samples of materials, design mix, equipment, tools, storage, and assistance as requested.
b. The Contractor shall notify Engineer three (3) working days prior to the expected time for operations requiring inspection and laboratory testing services.
c. Retesting required because of non-conformance to requirements shall be performed by the same independent firm on instructions by the Engineer. The Contractor shall be responsible for all costs including administrative, material testing, design and, engineering activities directly related to such retesting.

Installation

1. Inspection: The Contractor shall ins pect materials or equipment upon the arrival on the job site and immediately prior to installation and reject damaged and defective items.

2. Measurements: The Contractor shall verify measurements and dimensions of the Work, as an integral step of starting each installation.

3. Manufacturer's Instructions: Where installations include manufactured products, the Contractor shall comp ly with manufacturer's applicable instructions and recommendations for inst allation, to whatever extent these are more explicit or more stringent t han applicable requirements indicated in Contract Documents.
a. When manufacturers' instructions conflict with Contract Documents, request clarification from Engineer before proceeding.

Full compensation for conforming to all requirements specified in this Section, “Control of Materials,” shall be considered as included in the contract price paid for other items of work and no additional compensation will be allowed.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

228

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-28
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Replace Section 7-1.02D with:
7-1.02D UNMANNED AIRCRAFT SYSTEMS
Comply with 14 CFR 107 when operating UAS in the proximity of the highway.

Submit the following to the Engineer and
https://app.smartsheet.com/b/form/7ad42b76ef9e4f37ba2978520f1b1a5f as an informational submittal at least seven (7) working days before initial operation of UAS:

1. UAS remote pilot information

1.1. Pilot’s full name

1.2. Pilot’s contact information

1.2.1. Phone number

1.2.2. Email address

1.3. Pilot’s certification information

1.3.1. Certificate issuance date

1.3.2. Certificate expiration date

2. UAS information

2.1. UAS manufacturer

2.2. UAS model

2.3. Registration number

2.4. Registration issuance date

2.5. Registration expiration date
Maintain records of UAS flights. Submit a post-flight record as an informational submittal to the Engineer and
https://app.smartsheet.com/b/form/5e34deda3bd24f8f8397d895275ecbec within 1 business day of each flight. The post-flight record must include the following:

1. Flight date

2. Flight duration

3. Visual observer name and contact information

4. Purpose of flight

5. UAS Hazard Analysis Contractor/C onsultant form, as an attachment

6. Description of any accident s or incidents, if applicable Do not operate UAS over the traveled way unless preauthorized in writing by the Engineer. Launch and land UAS at least 50 feet from the edge of live traffic. 7-1.02I(2) Nondiscrimination
In Attention is directed to the following Notice that is required by Chapter 5 of Division 4 229

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-29
of Title 2, California Code of Regulations.

NOTICE OF REQUIREMENT FOR NONDISCRIMINATION PROGRAM (GOV. CODE, SECTION 12990)
The Contractor’s attention is called to the "Nondiscrimination Clause", set forth in Section 71.01A(4), "Labor Nondiscrimination," of the State Standard Specifications, which is applicable to all nonexempt state contracts and subcontracts, and to the "Standard California Nondiscrimination Construction Contract Specifications" set forth therein. The Specifications are applicable to all nonexempt state construction contracts and subcontracts of $5,000 or more.
7-1.02I(3) Nondiscrimination Statement
The contractor, subrecipient or subcont ractor will never exclude any person from participation in, deny any person the benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR 26 on the basis of race, color, se x, or national origin. In adm inistering the Local Agency components of the DBE Program Plan, the contractor, subrecipient or subcontractor will not, directly, or through contra ctual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE Program Plan with respect to individuals of a particular race, color, sex, or national origin.
7-1.02J NOVEL CORONAVIRUS (COVID-19) SAFETY REQUIREMENTS 7-1.02J.1 GENERAL
a. Section Includes: COVID-19 safety requirements to address the COVID-19 epidemic, including without limitation any requirements imposed by federal, state, and local guidelines and orders or those necessary for performance of work safely. b. These COVID-19 safety requirements ar e not all encompassing and may need to be modified by the Contractor for individual construction tasks and updated as the COVID-19 epidemic evolves.
c. The Contractor and all its sub-tier level subcontractors and suppliers shall account in their Bid and sub-bids for all cost impacts whether affecting labo r (including, but not limited to obtaining qualified workers, quantity of workers, as well as their productivity), deliveries, supervision, testing and/or procurement of materials and/or equipment and time caused by any COVID-19 safety requirements, including without limitation those found in this Section and also all public health and governmental directives in place at the time Bids are received by the City for this Project. 7-1.02J.2 COVID-19 EXPOSURE PREVENTION, PREPAREDNESS, AND RESPONSE PLAN
Contractor’s Responsibility
a. The Contractor shall prepare a COVI D-19 Exposure Prevention, Preparedness and Response Plan (a “COVID-19 Plan”) specific to this Project that describes how to prevent worker exposure to coronavirus; protective measures to be taken on the jobsite; personal protective equipment and work practice controls to be used; cleaning and disinfecting procedures; and pr ocedures to follow if a worker shows 230

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-30
symptoms of COVID-19 illness or tests positive for COVID-19. In addition to any governmental or other guidance available at the time of Bid submission, the Contractor should review OSHA CO VID-19 Workplace Safety Guidance documentation, such as: https://www.osha.gov/Publications/OSHA3990.pdf, as a resource in preparation of its COVID-19 Plan. Other reliable and current sources of COVID-19 information can be found from:

1. The California Department of Public He alth (CDPH, State), including without limitation, guidance such as:
https://www.cdph.ca.gov/Programs/CID/DCDC/Pages/Immunization/nCOV201

9.aspx

2. The federal Centers for Disease C ontrol and Prevention (CDC, National), including without limitation, guidance such as:
http://www.cdc.gov/coronavirus/novel-coronavirus-2019.html

3. The Santa Barbra County Public Health Department, including without limitation, guidance found here: https://publichealthsbc.org/
b. The Contractor’s COVID-19 Plan shall at a minimum address the following COVID- 19 safety guidelines:

1. COVID-19 Employee and Visitor training and check-list before entering worksite.

2. Employee distancing and st rategies to maximize distancing when possible.

3. Limitations on gathering size.

4. Personal Protective Equi pment (PPE) requirements.

5. Identification of “choke points” and “high risk areas” such as hallways, hoists and elevators, break areas and vehicles.

6. Staggering trades and modifi cation of work schedules to reduce worker density to maximize distancing opportunities.

7. COVID-19 employee good per sonal hygiene measures.

8. Disinfection and cl eaning requirements.

9. Personal prevention actions requirements for all employees.

10. Toolbox and Tailgate COVID-19 employee training.

11. Recognition of COVID-19 Symptoms.

12. Procedures for COVID-19 exposure and notification to others who were at the Site.

13. Daily screening protocols for arriving workers and visitors to ensure potentially infected workers and visitors do not enter the Site.

14. Maintenance of daily attendance logs of all workers and visitors who enter the Site.
c. Also, as part of this Pl an, the Contractor shall dr aft and implement a COVID-19 Code of Safe Practices that is posted in areas visible to all employees and visitors. d. The Contractor shall be prepared at eac h Progress and Coordination Meeting, if 231

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-31
requested by the Engineer, to provide in formation relevant to the application, enforcement, and implementation of the Code of COVID-19 Safe Practices. e. All Contractor managers and supervisors (from forepersons to project managers) must be familiar with the COVID- 19 Plan and be ready to answer questions from employees, subcontractors, suppliers and visitors. Managers and supervisors must set a good example by following the COVID-19 Plan at all times.

This involves practicing good personal hy giene and jobsite safety practices to prevent the spread of the virus. Managers and supervisors must encourage this same behavior from all employees, subcontractors, suppliers and visitors. f. The Contractor shall immediately notif y the Engineer if any person under the Contractor’s control on this Project has tested positive for COVID-19. g. The Contractor is responsible to prov ide to the Engineer its COVID-19 Plan. This plan is due to the Engineer at the pre-construction m eeting. No work shall be permitted until this plan is accepted by the Engineer.

Replace the 1st item in the list of the 2nd paragraph of section 7-1.02K(2) with:

1. At the Department's Office

Add to Section 7-1.02K(2):
7-1.02K(2) Prevailing Wage
In addition to the requirements of Section 7-1.02K(2) Wages of the State Standard Specifications:

The possibility of wage increases is one of the elements to be considered by the Contractor in determining the bid, and will not under any circumstances be considered as the basis of a claim against the City on the contract.

The general prevailing wage rates determined by the Director of Industrial Relations, for the county or counties in which the work is to be done, are available at the City of Goleta, 130 Cremona Drive, Suite B, Goleta, CA 93117. These wage rates are not included in the Proposal and Contract for the project. Changes, if any, to the general prevailing wage rates will be available at the same location.

Payment of prevailing wage must be documented through submission of certified payroll records for the prime Contractor and lower tier Subcontractors.

Replace item 1.3 in the list in the 2nd paragraph of Section 7-1.02K(3) with:

1.3 Last four digits of social security number pursuant to Labor Code § 226(a)

Add to Section 7-1.02K(5):
7-1.02K(5) Working Hours
Working hours are Monday through Friday, 8 AM-5:30 PM
232

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-32
If overtime work is approved by the Engi neer, the City shall make deductions in the contractor progress payment . The Contractor shall reimburse the City as outlined in section 5-1.08 INSPECTION for the actual cost of all inspection cost for work requested outside of the contract working hours, Saturday and Sunday work, or inspection performed during designated City, State, or Federal holidays.

Requests for authorization to perform work outside the hours listed above shall be made in writing at least seventy-two (72) hours in advance.
7-1.02K(6) Occupational Safety and Health Standards
Replace the 1st sentence in the 5th paragraph of section 7-1.02K(6)(a) with:

Submit copies of the Contractor’s Injury and Illness Prevention Prog ram, Code of Safe Practices, and permits required by Cal/OSHA as informational submittals.

Replace the 1st sentence in the 5th paragraph of Section 7-1.02K(6)(a) with:

Submit copies of the Contractor’s Injury and Illness Prevention Program, Code of Safe Practices, and permits required by Cal/OSHA as informational submittals.

Replace Reserved in Section 7-1.02M(2) with:

Submit the names and emergen cy telephone numbers of the nearest fire suppression agencies before the start of job site activiti es as an informational submittal. Post the names and phone numbers at a prominent place at the job site.

Submit a copy of the Contractor’s fire pr evention plan required by Cal/OSHA as an informational submittal before the start of job site activities.

Cooperate with fire prevention authorities in performance of the work. Immediately report fires occurring within and near the project lim its by dialing 911 and to the nearest fire suppression agency by using the emergency phone numbers retained at the job site.

Prevent project personnel from setting open fire s that are not part of the work. Prevent the escape of and extinguish fires caused directly or indirectly by job site activities.

Replace the 2nd paragraph of Section 7-1.02M(3) with:

For the list of permitted sites, go to the D epartment of Conservati on, Division of Mine Reclamation website.

Replace the 4th sentence in the 16th paragraph of Section 7-1.03 with:

When not described and if ordered, providing flaggers is change order work.

233

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-33
Add to Section 7-1.03:
7-1.03 PUBLIC CONVENIENCE
In addition to the requirements of Section 7-1.03 PUBLIC CONVEN IENCE of the State Standard Specifications, Contra ctor shall notify the affected residents and businesses four (4) calendar days in advance of the start of work. Notification shall be done by using “door knob” type notices which shall include a description of the impending work, the date and time when traffic will be restricted, a date and time when parking will not be allowed along the street scheduled for renovation and forty-eight (48) hour window of “no landscape irrigation” prior to work. Contractor shall submit a sample notice for review and approval by the City five calendar days prior to distribution.

Ten (10) calendar days prior to beginning construction, Contractor shall assist in notifying local schools, hospitals, ambulance services, police and fire departments, transit agencies, refuse collectors and Underground Service Alert (USA) of its schedule of work.

Contractor shall furnish and place “No Parking” signs, 12 inches by 18 inches minimum size and approved by the Engineer, throughout the area of work at fifty-foot intervals two (2) working days (four (4) calendar days prior to work beginning on a Monday or Tuesday) prior to the start of construction. In rural areas, the signs shall be placed at intervals not to exceed 400 feet. The signs shall includ e the date and time during which parking is prohibited. The Contractor shall remove these signs immediately when they are no longer needed. The signs shall post the city ordinance referencing towing of vehicles illegally parked.

If for any reason the work is delayed or rescheduled after the required notifications have been issued, the Contractor shall re-date the signs affected, notify residents and businesses of the change via a new “door knob” notice, and re-contact the local services and agencies. If the work is delayed more than five calendar days, the Contractor shall remove the signs and place re-dated signs two working days (four calendar days prior to work beginning on a Monday or Tuesday) in advance of the work.

Full compensation for “Notification of Residents, Businesses & Agencies” will be paid on a lump sum basis as indicated in the Bi d Schedule, and no additional compensation will be allowed therefor.

Replace the 3rd sentence in the 7th paragraph of Section 7-1.04 with:

When not described and if ordered, providing flaggers is change order work.

Replace the 13th paragraph of Section 7-1.04 with:

Equipment must enter and leave the highway via existing ramps and crossovers and must move in the direction of traffic. All movements of workers and construction equipment on or across lanes open to traffic must be perfo rmed in a manner that do not endanger the public. The Contractor’s vehicles or other mobile equipment leaving an open traffic lane to enter the construction area must slow down gradually in advance of the location of the turnoff to give the traffic following an opportunity to slow down. When leaving a work area and entering a roadway carrying traffic, the Contractor’s vehicles and equipment must yield to traffic. Compensat ion for flaggers, used for all movement of workers and construction vehicles and equipment on or across lanes open to traffic, is included in the bid items of work involved.
234

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-34
Add to Section 7-1.04:
7-1.04 PUBLIC SAFETY
In addition to the requirements of Section 7-1.04 PUBLIC SAFETY of the State Standard Specifications, the Contractor shall cooperate with and not ify the local police and fire departments, school districts, Refuse, ambulance services, and Public Works Street Division of proposed construction operations two (2) working days before work is to begin.

The Contractor shall be responsible to notify and coordinate their schedule with schools that may be in or adjacent to the projects area.

Full compensation for conforming to the requirements of this Section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.

Replace Reserved in Section 7-1.10 with:
7-1.10 PERMITS AND LICENSES
The City of Goleta has received permits and a copy of the permits can be found in the appendices. A copy of all permits listed below must be kept at the job site at all times.

The Contractor shall comply with all permi t conditions and requirem ents. If, for any reason, the permit time limits need to be extended, it shall be the Contractor’s sole responsibility to request such extension(s) and to pay any additional fees associated with the permit extension(s). Refer to sections elsewhere in these Special Provisions for more detail on permits.

No separate measurement or payment shall be made for compliance with permit requirements, extensions or preparation and approval of Contractor’s work plan and dewatering plan. The Contractor shall include the costs associat ed with these items in the various bid items to which the Work relates.

The Contractor shall obtain a business license from the City of Goleta prior to performing the work.

The Contractor may use water from Goleta Wa ter District fire hydrants provided that the required permits are obtained and the Contractor has paid the associated fees.

Full compensation for conforming to all requir ements specified in this section shall be considered as included in the contract price paid for other items of work and no additional compensation will be allowed therefor.

Relations with California Department of Transportation
A. A portion of this project is located within the jurisdiction of the California Department of Transportation (Caltrans). Before co nstruction, Contractor shall obtain an Encroachment Permit from Caltrans for the portion of work located within the State right of way and for placing and maintaining any proposed traffic control measures within the State right of way.

B. Attention is directed to Sections 7-1. 11, “Preservation of Property,” and 7-1.12, “Responsibility for Damage,” of the State Standard Specifications. 235

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-35
C. Any change in the conditions listed in the permit proposed by Contractor shall be submitted to Engineer for transmittal to Caltrans for their approval. Changes shall not be implemented until approved in writing by Caltrans.

D. Contractor shall prepare a traffic control plan for review and approval by Caltrans as part of the Encroachment Permit application.

E. In addition to traffic control devices, Contractor shall comply with all conditions of the Caltrans Stormwater Permit for construction activities within the State right of way.

F. Full compensation for conforming to the requirements of this section shall be considered as included in the prices pai d for the various contract items of work involved and no additional compensation will be allowed therefor. The approximate cost of the Encroachment Permit is $1,000.00.

Right of Way
A. A portion of this project is located outside of the public right-of-way. A Right-of-Entry for the Work is included in the appendix.

B. Contractor shall not be entitled to the exclusive use of any public street or rights- of-way during the performance of the work under the contract, and Contractor must conduct operations so as not to interfere unnecessarily with business, traffic, pedestrians, and the authorized work of utility companies or other agencies in the street or rights-of-way. Neither the Specifications nor the Plans may be construed to entitle Contractor to conduct operations within the rights-of-way which are in violation of any local, county, or st ate ordinance or regulation restricting interference with water courses and drai nage channels. Contractor must take adequate precautions against obstructing storm water flow within the project limits.

Contractor may not deposit excavated mate rials, store equipment or construction materials within the street.

Add Section 7-1.12:
7-1.12 COOPERATION
The Contractor shall cooperate with other forces constructing, relocating, and/or modifying facilities within the project limits. The Contractor shall coordinate his work with that of others, including utility companies, to present delays.

It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in their present and/or relocated positions as shown on the plans or as described in the specifications, and that no additional compensation will be allowed for any delays, inconvenience, or damages sustained due to any interference from said appurtenances or the operation of moving them. In addition, the Contractor shall not be allowed any additional compen sation for delays of inconvenience sustained by the Contractor due to the City not having City-supplied equipment ready for pick-up. In such a case, the City may increase the number of working days for the contract.

Five (5) working days prior to beginning work, the Contractor shall provide to the Engineer, in writing, the name and telephone number of a representative who is directly involved with this project, and under the superv
ision of the Contractor. The Contractor’s representative may be contacted by City staff during non-working hours including nights, weekends and 236

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-36
holidays in the case of any public inconvenience and/or emergency rela ting to the Contractor’s operations. The contact repres entative shall not be replaced by another company employee for the duration of the project without a written explanation from the Contractor which has been approved by the Engineer. Should a new representative be used, he/she shall be knowledgeable of the project, the events, and/or revisions that may be occurring.

Full compensation for conforming to the requirements of this Section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.

Add Section 7-1.13:
7-1.13 RIGHTS IN LAND AND IMPROVEMENTS
The Contractor is responsible for making arrangements to stockpile and store equipment outside the public right of way as work is performed. Personal vehicles of the Contractor's employees shall not be parked on the traveled way or shoulders, private property, including any Section closed to public traffic.

The Contractor shall secure easements at their own expense for any areas required for plant sites, storage of equipment or materials, or for any other purposes. Before occupying any easement area, the Contractor shall provide the Engineer a written statement from each property owner verifying easement acquisition.

Staging areas located on private property shall be restricted to properties where the property owner has given written authorization to the Contractor for use of said property.

The Contractor shall submit, at the Pre-Construction meeting, documentation of the written authorization from the property owner(s). Prior to final acceptance of the project, the Contractor shall provide the Engineer a written statement of release from each property owner that granted an easement for the Contractor’s operations.

Full compensation for conforming to all requirements specified in this Section shall be considered as included in the contract price paid for various items of work and no additional compensation will be allowed.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

237

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-37
8 PROSECUTION AND PROGRESS
Add the following to Section 8-1.01:

Weekly meetings will be held at the job site to review the progress of the work and discuss any problems that may have occurred. Provide an updated three-week look-ahead schedule at the weekly meeting. The meeting must include, at a minimum:

1. The Engineer;

2. Inspectors;

3. Contractor Foreman; and

4. The Contractors Res ponsible Scheduling Person.

In addition to daily reports required to subs tantiate the costs of claims and changes performed as force account work and for Disputed Work pursuant to Section 21 of these Special Provisions, the Contra ctor must complete a daily report indicating locations worked, start/finish and milestone dates, tota l workforce per construction trade for each task, major equipment on site, Contractor’s workforce and equipment, each Subcontractor’s workforce and equipment, , ma terials delivered, w eather conditions, safety (meetings, inspections, accidents, OSHA citations, actions taken) quality (meetings, inspections, tests), visitors, problems encountered, shortages, delays to planned progress, and any othe r related information involved in the performance of the work. The daily report must be completed on forms furnished to the Contractor, and submitted at the end of each workday. The report must comm ent on the daily progress and status of the work within each major component of the work.

No progress payments will be made prior to submission and acceptance of the Schedule by the Engineer.

Replace Section 8-1.02C(3)(b) with:
8-1.02C(3)(b) Schedule Software Licenses
The Contractor shall provide one licensed copy of the Microsoft Project scheduling software program used to produce the Contractor's Schedule to the Engineer, registered in the Engineers name. This licensed copy must be provided no later than five (5) working days after the Notice to Proceed date and shall be fully licensed for the project duration and for 6 months after the NOC date.

Replace Section 8-1.02C(10) with:
8-1.02C(10) Payment
Full compensation for conforming to all require ments specified in this Section, “CPM,” shall be considered as included in the contract price paid for other items of work and no additional compensation will be allowed.

Add to Section 8-1.03
238

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-38
In addition to Section 8-1.03 PRECON STRUCTION CONFERENCE of the State Standard Specifications:

Prior to the start of construction, a preconstruction conference will be called by the Engineer for the purpose of discussing with the Contractor the scope of work, contract drawings, specifications, existing conditions, materials to be tested, e quipment to be used, and all essential matters pertaining to the prosecution and the satisfactory completion of the project as required. The Contractor's representative at this conference shall include all major superintendents for the work and may include major Subcontractors and material suppliers.

Submit the following items to the Engineer for review at least five (5) working days prior to the preconstruction conference. Issuance of a Notice to Proceed is dependent on the timelines and the proper level of detail of these submittals. Submittals shall include, but are not limited to:

1. Key Personnel, Telephone Numbers and Emergency Te lephone Numbers

2. Project Construction Schedule per specifications

3. Public Notices (i.e. No tifications and Door Hangers)

4. Storage Site Locations

5. Traffic Control Plan / Detour Plans

6. Parking Restriction Signs

7. Noise mitigation measures

8. Dust Control measures

9. Waste Disposal Plan

10. Copies of pertinent permits, licenses, certifications or required approvals, per specifications

11. Required Inspections

12. Finalized SWPPP

13. Electrical and Signal Poles and Equipment

8-1.03B PROGRESS MEETINGS
Attend Weekly Project Status Meetings with key personnel and utility agencies, including the Contractor’s assigned r epresentative and the Contra ctor’s Subcontractors' representative. The meeting will have dur ation of approximately one hour. The meeting shall be held on the same working day of each week and at the same time of the day as mutually agreed to by Engineer and the Contractor. The purpose of this meeting shall be to discuss interfacing work, scheduling, problems, issues, and other issues related to the project. If not previously submitted, submit the following to the Engineer at the beginning of the meeting:

1. Daily workforce and equipment utilizatio n and certified payroll for the preceding week; and

2. Projected daily work for the next three weeks.

Replace the row for Safety in the table in the 2nd paragraph of section 8-1.03 with:

Injury and Illness Prevention Program, Code of Safe Practices, and job site posters
Safety
239

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-39

Replace entire Section 8-1.04A with:
8-1.04A GENERAL
Attention is directed to the provisions in in Section 8-1.05 TIME and Section 8-1.10 LIQUIDATED DAMAGES of the State Standar d Specifications and these Special Provisions. In addition to Section 8 PROSECUTION AND PROGR ESS of the State Standard Specifications, the following shall apply:

All work shall be completed within 20 working days from the date of the Notice to Proceed.

All punch list items shall be completed within the specified contract working days. The project will not be accepted until all punch list items and plant establishments are completed.

The Contractor shall pay to the City of Goleta the sum of dollars per day as outlined in section 8-1.10 LIQUIDATED DAMAGES of the State Standard Specifications, for each and every calendar days’ delay in finishing the work in excess of the number of working days prescribed above.

The Contractor shall be responsible to coordinate utilities relocations within the project area. Coordination of utilities within the project limits, including relocations and maintenance of existing facilities and additions thereto, shall be confirmed in writing by utility representatives and the Contractor at this conference or within five (5) working days thereafter.

NOTICE TO PROCEED
The Contractor shall begin work within fifteen (15) calendar days from the date of a "Notice to Proceed" letter, and the Contractor shall thereafter diligently prosecute the work to completion.

The Contractor shall notify the Director, in writing, of his or her intent to commence work at least seventy-two (72) hours before work is to begin. The notice shall specify the date on which the Contractor intends to begin work. If a project has more than one (1) location of work, a separate notice shall be given for each location.

Should the Contractor begin work in advance of issuance a "Notice to Proceed," any work performed in advance of such issuance shall be considered to have been done at Contractor's own risk and as a volunteer.

Notwithstanding any other provision of the contract, City shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed whether or not the City has knowledge of the furnishing of such work.

Submit no less than ten (10) days in advance of the commencement of the proposed work:

1. Specific date, hours and location of work;

2. Complete description of work to be done;

3. Number and type of equipment to be used;

4. Noise mitigation measures to be employed;
240

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-40

5. Distance of the nearest resident to the work;

6. Electrical, signal poles and equipment proof of order; and

7. Inspection required.

Replace entire Section 8-1.04B with:
8-1.04B START OF JOB SITE ACTIVITIES
Contractor shall not begin any job site activities until the Notice to Proceed is issued.

Notify the Engineer seventy-two (72) hours in advance of commencing job site activities.

Add to Section 8-1.05:
8-1.05 TIME
In addition to Section 8-1.05 TIME of the State Standard Specifications, the Contractor shall diligently prosecute the work to completion in accordance with the following schedule.

All work shall be completed within worki ng days outlined in Section 8-1.04A GENERAL of these Special Provisions.

A punch list will be created after all bid items have been completed by the Contractor and it shall be the Contractor’s responsibility to notify the Engineer in writing that all bid items have been completed. All punch list items shall be completed within the specified contract working days. The project will not be accepted until all punch list items and plant establishment has been completed.

A sample of the weekly statement of worki ng days is in Appendix A. You must use the most recent Caltrans weekly statement of working days which can be downloaded at https://dot.ca.gov/programs/construction/contract-time.

Add to the end of Section 8-1.06:

Responsibilities of Contractor During Suspension Periods During periods that Work is suspended, Contractor shall continue to be responsible for the Work and shall prevent damage or injury to the project, provide for drainage, and shall erect necessary temporary structures, signs, or other facilities required to maintain the project and public safety and continue to perform in accordance with the safety requirements of the Contract Documents.
8-1.06A SUSPENSIONS OF WORK ORDERED BY THE ENGINEER

1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unr easonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. 241

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-41

2. Upon receipt, the engineer will evaluate t he contractor's request. If the engineer agrees that the cost and/or time required for the perform ance of the contract has increased as a result of such suspens ion and the suspension was caused by conditions beyond the control of and not the f ault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in writing accordingly.

The contractor will be notified of the engin eer's determination whether or not an adjustment of the contract is warranted.

3. No contract adjustment will be allowed unless the cont ractor has submitted the request for adjustment within the time prescribed.

4. No contract adjustment will be allowed under this clause to the extent that performance would have been su spended or delayed by any other cause, or for which an adjustment is provided or excl uded under any other term or condition of this contract.

Add to the end of Section 8-1.07B:

If the Engineer grants an adjustment in time for avoidable delay, the City shall have the right and authority to make deductions in payments due or to become due to the Contractor as the City may deem just and reasonable for engineering, inspection, general supervision and overhead expenses.
8-1.07B(1) Delays to Critical Path
Extensions of time, when granted, will be based upon the effect of delays to the critical path of the Work as a whole and will not be granted for non-controlling delays to included portions of Work unless it can be shown that such delays did, in fact, delay the progress of the Work as a whole.
8-1.07B(2) Conditions to Time Extensions
The Contract Time or Milestones shall be extended only if, in the opinion of City, the Contractor is necessarily delayed in completing the Contract by a cause that meets all of the following conditions:

1. Such cause is beyond the control of Contractor, its S ubcontractors, or material suppliers and is not due, in whole or in part, to the breach, negligence or fault of Contractor, its Subcontractors, or material suppliers;

2. Such cause arises after the Bid deadline and neither wa s nor could have been anticipated before the Bid deadline;

3. The effect of such cause could not be anticipated and avoided or mitigated by the exercise of all reasonable precautions, efforts and measures by the Contractor, including re-planning, scheduling and re-sequencing;

4. Such cause, in fact, resu lts in a delay in the performance of the critical path of the Work, which is not thereon thereafter recovered;

5. Contractor has given notice thereof and provided the back-up documentation and analysis as required by the Contract Documents or as requested by the Engineer or City incl uding but not limited to as-planned versus as-built schedules; and
242

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-42

6. The Contractor has exercised a ll reasonable precautions, efforts and measures to accomplish such changes in the Work without extending the date for completion.
8-1.07B(3) Excusable Non-Compensable Delay
The Parties acknowledge that “Force Majeure” events, as defined in Section 1-1.07B, are not within the responsibility or control of the City or are reasonably contemplated by the Parties to occur during the course of performance of the Work, which may impact the schedule for performance of the Work and may entitle Contractor to an extension of the Contract Time (“Excusable Non-Compensable Delays”). If the Critical Path of the Work is delayed by Excusable Non-Compensable Delays, provided that such delays did not result from the acts of Contractor and further provided that Contractor takes reasonable precautions to prevent further delays owing to such causes, then the Contract Time and/or Milestones shall be extended by a Change Order or Construction Change Directive.

An extension to the Contract Time and/or to the completion Milestone(s) identified in the Contract Documents shall be the Contractor’s sole remedy for Excusable Non-Compensable Delays. In no event shall Contractor be entitled to any compensation or recovery of any damages in connection with the Excusable Non-Compensable Delays defined above.
8-1.07B(4) Excusable Compensable Delay
“Excusable Compensable Delay” means any delay to the critical path of the Work occurring after commencement and prior to completion of the Work:
which directly impacts the number of Working Days established in the Agreement for completion;
for which City is responsible, is unreasonable under the circumstances involved, and not within the contemplation of the Parties; and
is not due, in whole or in part, to the breach, negligence, or fault of Contractor, its Subcontractors, or Suppliers. Contractor’s remedy for Excusable Compensable Delay shall be extension of the date for completion and Milestones subject to the Conditions to Time
Extensions identified above and reimbursement of actual costs directly resulting from such delays and markup in accordance with Section 9.
8-1.07B(5) Inexcusable Delay
“Inexcusable Delay” means any delay in the critical path of activities required for completion of the Work resulting from causes other than those deemed to be an Excusable Non-Compensable Delay or an Excusable Compensable Delay by these Special Provisions. An Inexcusable Delay shall not entitle Contractor to either an extension of the date for completion or Milestones or to any additional compensation whatsoever.
8-1.07B(6) Concurrent Delays
To the extent the Contractor is entitled to an extension of time due to an Excusable Non-Compensable Delay or to an Excusable Compensable Delay, but the performance 243

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-43
of the Work is independently suspended, delayed, or interrupted by an Inexcusable Delay, the delay shall be deemed to be a “Concurrent Delay.” In the case of a Concurrent Delay, Contractor shall be entitled to an extension of the Contract Time or Milestone(s) and Contractor shall not be entitled to any additional compensation whatsoever during the period of Concurrent Delay. 8-1.07B(7) Claim for Additional Time
Any claim for extension of time shall be made in writing within the time limits provided in Section 5-1.43 herein. Within ten (10) calendar days after commencement of such delay the Contractor shall furnish the Engineer with detailed information concerning the circumstances of the delay, the number of days actually delayed, the appropriate Contract Document references, and the measures taken to prevent or minimize the delay including an as-planned versus as-built schedule. The Contractor acknowledges the extreme importance of promptly notifying and thoroughly documenting any request for time extension and further specifically acknowledges that the City will suffer extreme prejudice should Contractor fail in any way to comply with this requirement. 8-1.07B(8) Limits on Adjustment of Contract Time or Contract Sum for Material Shortages or Cost Escalation
No extension of Contract Time or adjustment of the Contract Pric e will be granted for a delay caused by a shortage of materials, unless the Contra ctor furnishes to the City documented proof that the Cont ractor has diligently made ev ery effort to obtain such materials from every known source within reasonable reach of the Work. The Contractor shall also submit proof, in the form of netwo rk analysis data that the inability to obtain such materials when originally planned did, in fact, cause a delay in completion of the Work which could not be compensated for by revising the sequence of operations. Only the physical shortage of material will be considered under these provisions as a cause for extension of time. No consideration will be given to any claim for adjustment of the Contract Price on the basis that material could not be obtained at a reasonable, practical, or economical cost except as provided in 9-1.07.

Contractor is aware that governmental agencies, such as gas companies, electrical utility companies, water districts and other agencies, may be required to approve Contractor- prepared drawings or approve a proposed installation. Contractor has endeavored to include the cost of such anticipated dela ys and related costs which may be caused by such agencies in Contractor’s Bid. Thus, C ontractor is not entitled to make claim upon the City for damages or delays arising from the delays caused by such agencies.

Furthermore, the Contractor has scheduled fo r such delays and is not entitled to an extension of time for delays caused by gov ernmental agencies which Contractor must obtain approvals from. No extension of time will be granted under this Section 8-1.07B for any delay to the extent: (1) that per formance would have been so delayed by any Contractor induced causes, including but no t limited to the fault or negligence of the Contractor or its Subcontract ors; or (2) for which any re medies are provided for or excluded by any other provision of the Contract.
8-1.07B(9) No Release of Sureties
An extension of time granted shall not release the sureties from their obligations. Work shall continue and be carried on in accordance with all the provisions of the Contract 244

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-44
and the Contract shall be and shall remain in full force and effect during the continuance and until the completion and the City’s final acceptance of the Work covered by this Contract unless formally suspended or annulled in accordance with the terms of the Contract Documents.
8-1.07B(10) No Waiver by City
Neither the grant of an extension of time beyond the date fixed for the completion of any part of the Work nor the doing and acceptance of any part of the Work or materials specified by this Contract after the time specified for the completion of the Work, shall be deemed to be a waiver of any other rights and remedies under the Contract. 8-1.07B(11) City’s Right to Order Extraordinary Measures to Mitigate Delay In the event of delays to the project, the Engineer may order Extraordinary Measures as provided below.
8-1.07B(11)(a) Non-Compensable Extraordinary Measures
In the event the Engineer determines that the performance of the Work, or any portion thereof, has not progressed or reached the level of completion required by the Contract Documents due to causes within the control of Contractor, the Engineer shall have the right to order the Contractor to take corrective measures necessary to expedite the progress of construction, including, without limitation, (1) working additional shifts or overtime, (2) supplying additional workforce, equipment, and facilities, and (3) submitting a recovery schedule for re-sequencing performance of the Work or other similar measures (hereinafter referred to collectively as Extraordinary Measures). Such Extraordinary Measures shall continue until the progress of the Work complies with the stage of completion as required by the Contract Documents. The Contractor shall not be entitled to an adjustment in the Contract Price in connection with the Extraordinary Measures required by the City under or pursuant to this Section. The City may exercise the rights furnished the City under or pursuant to this Section as frequently as the City deems necessary to ensure that the Contractor’s performance of the Work will comply with the Contract Time, or interim completion date set forth in the Contract Documents.

If Contractor or its Subcontractors fail to commence Extraordinary Measures within forty-eight (48) hours of City’s written demand, the City may, without prejudice to other remedies, take corrective action at the expense of Contractor. 8-1.07B(11)(b) Compensable Extraordinary Measures
The Engineer, in its discretion, may issue a written request, to the Contractor requesting Contractor to submit an itemized proposal for Extraordinary Measures in order to achieve early completion of all or a portion of the Work, due to no fault of the Contractor, in a form acceptable to the City within ten (10) calendar days after the City’s issuance of the request. Contractor’s proposal shall be limited to direct labor cost (itemized hours and rates) and overhead and profit on the labor costs. 8-1.07B(12) Continuation of the Work
If the construction of the Work is not completed within the Contract Time, as may be extended by the City, the Contractor shall continue performing the Work in accordance with the Contract Documents until the completion of and the acceptance of the Work, or Contractor’s performance is suspended or terminated.
245

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-45

Replace the 2nd paragraph of Section 8-1.07C with:

Losses for idle equipment, idle workers, and moving or transporting equipment are eligible for delay- related payment adjustments.

If the Contractor claims additional costs due to impacts from an excusable delay, the Contractor must comply with section 5-1.42 REQUESTS FOR INFORMATION. Support the Contractor’s claim for additional costs based on the difference between the cost to perform the work as planned and the cost to perform the work as changed as determined under section 9-1.04. The Department adjusts payment for the work portion that was impacted.

The Contractor may schedule completion of all of the Work, or portions thereof, earlier than the Contract Time. Contractor, however, shall not be entitled to an adjustment of the Contract Price or to any additional costs or damages (including, but not limited to, claims for extended general conditions costs, home office overhead, jobsite overhead, and management or administrative costs), or any compensation whatsoever for Contractor’s use of float and/or Contractor’s inability to complete the Work earlier than the Contract Time for any reason whatsoever, including, but not limited to, delay caused by the City or other Excusable Compensable Delay. The City is exempt from liability for such costs, damages, and compensation.

Add to Section 8-1.10:
8-1.10 LIQUIDATED DAMAGES
In addition to the requirements of Section 8-1.10 LIQUIDATED DAMAGES of the State Standard Specifications:

Any progress payment made after the completion date shall not be construed as a waiver of liquidated damages.

The Department may withhold liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work. 8-1.10A GENERAL
In addition to section 8-1.10A General the following shall apply. The Contractor shall pay to the City of Goleta the sum of $4,000 per day, each and every calendar day’s delay in finishing the work in excess of the number of working days prescribed above. Any progress payment made after the completion date shall not be construed as a waiver of liquidated damages.

For each and every day that any portion of t he work remains unfinished after the time fixed for completion in the contract document s as modified by any extension of time, damage will be sustained by the City. Because of the difficulty in computing the actual material loss and disadvantage to the City, the Contractor and City agree that Contractor will pay the City the am ount of damages set forth herein as representing a reasonable forecast of the actual damages which the City will suffer by the failure of the Contractor to complete the work within the stipulated time. The execution of the agreement shall constitute acknowledgment by the Contractor that he or she has ascertained and agrees 246

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-46
that the City will actually suffer damages in the amount herein fixed for each and every day during which the completion of the work is avoidably delayed beyond the stipulated completion date.

Unless otherwise provided in the contract documents, the Contractor shall have no claim or right of action against the City for dam ages, costs, expenses, lo ss of profits, or otherwise because or by reason of any delay in the fulfillment of the contract within the time limited therefor occasioned by any cause or event within or without the Contractor's control, and whether or not such delay may have resulted from anything done or not done by the City.

Add to Section 8-1.10B:

The roadway section and or intersection shall be opened to traffic by the end of the roadways last working hours of the lane closure charts. The Contractor shall pay to the Goleta the sum of $2,000.00 per hour for each hour, or portion of an hour, after the last working hour are exceeded and that a traveled lane remains closed due to the Contractor’s operations.

The Engineer will provide written notice of non-conformance to the Contractor within 24 hours of the violation. All Contractor's equipment, machi nery, traffic control, and personnel shall be off of the pavement and a ll lanes shall be open to traffic to be considered as full compliance.

Any progress payment made after the completion date shall not be construed as a waiver of liquidated damages.
8-1.11 UTILITY AND NON-HIGHWAY FACILITIES
Attention is directed to Section 15 EXI STING FACILITIES of the State Standard Specifications and these Special Provisions.

The Contractor shall notify the Engineer and the appropriate regional notification center for operators of subsurface installations at least 3 working days, but not more than 14 calendar days, prior to performing any excavation or other work close to any underground pipeline, conduit, duct, wire or other structure. Regional notification centers include, but are not limited to, the following:

Notification Center Telephone
Number
Underground Service Alert-Southern
California (USA)
(811) 422-4133
(800) 422-4133
The Contractor is cautioned that there may be underground and overhead utility facilities within the work area including telephone, electrical, cable television, gas, water and sanitary sewer transmission facilities, and storm drainage collection facilities.

Where possible conflict may ex ist, the Contractor shall veri fy the grade and location of existing underground utility prior to any work.

It is recognized by the City and the Contractor that the locations of existing utilities as shown on the plans are approximate, their actual location is unknown. Recognition is given to the fact there may be additional existing utilities unknown to either party to the contract. Location 247

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-47
of utilities, as shown on the drawings, represents the best information obtainable from utility maps and information furnished by the various agencies and companies involved. The City warrants neither the accuracy nor the extent of the actual utilities involved.

In the event the Contractor discovers utilities not identified on the plans or by the utilities, the Contractor shall immediately notify the Engineer and the utility owners by the most expeditious method reasonably available and later confirm in writing.

The right is reserved to the Department and the owners of facilities, or their authorized agents, to enter upon the highway right of way for the purpose of making those changes that are necessary for the r earrangement of their faciliti es or for making necessary connections or repairs to their properties. The Contractor shall cooperate with forces engaged in this work and shall conduct operati ons in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by the other forces.

Wherever necessary, the work of the C ontractor shall be coordinated with the rearrangement of utility or othe r non-highway facilities, and the Contractor shall make arrangements with the owner of those facilities for the coordination of the work.

Attention is directed to the possible existence of underground main or trunk line facilities not indicated on the plans or in these Special Provisions and to the possibility that underground main or trunk lines may be in a location different from that which is indicated on the plans or in these Special Provisions. The Contractor sha ll ascertain the exact location of underground main or trunk lines whose presence is indicated on the plans or in these Special Provisions, the location of their service laterals or other appurtenances, and of existing service lateral or appurtenances of any other underground facilities which can be inferred from the presence of visible facilities such as buildings, meters and junction boxes prior to doing work that may damage any of the facilities or interfere with their service.

If the Contractor cannot loca te an underground facility whose presence is indicated on the plans or in these Special Provisions, the Contractor shall so notify t he Engineer in writing. If the facility for which the notice is given is in a s ubstantially different location from that indicated on the plans or in these Special Provisions, the additional cost of locating the facility will be paid for as extra work as provided in Section 4-1.05.

If the Contractor discovers underground main or trunk lines not indicated on the plans or in these Special Provisions, the Contractor shall immediately give the Engineer and the Utility Company written notification of the existence of those facilities. The main or trunk lines shall be located and protected from da mage as directed by the Engineer, and the cost of that work will be paid for as extr a work as provided in section 4-1.05.The Contractor shall, if directed by the Engineer, repair any damage which may occur to the main or trunk lines. The cost of that repair work, not due to the failure of the Contractor to exercise reasonable care, will be paid for as ex tra work as provided in Section 4-1.05.

Damage due to the Contractor's failure to exercise reasonable care shall be repaired at the Contractor's cost and expense.

Where it is determined by the Engineer that the rearrangement of an underground facility is essential in order to accommodate the highway
improvement and the plans and
specifications do not provide that the facility is to be rearranged, the Engineer will provide for the rearrangement of the facility by other forces or the rearrangement shall be performed by the Contractor and will be paid for as extra work as provided in Section 4- 248

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-48

1.05. When ordered by the Engi neer in writing, the Contractor shall rearrange any utility or other non-highway facility necessary to be rearranged as a part of the highway improvement, and that work will be paid for as extra work as provided in Section 4-1.05.

Should the Contractor desire to have any rearrangement made in any utility facility, or other improvement, for the Contractor's convenience in order to facilitate the Contractor's construction operations, which rearrangement is in addition to , or different from, the rearrangements indicated on the plans or in these Special Provisions, the Contractor shall make whatever arrangements are necessary wit h the owners of the utility or other non- highway facility for the rearrangement and bear all expenses in connection therewith.

The Contractor shall immediat ely notify the Engineer of any delays to the Contractor's operations as a direct result of underground main or trunk li ne facilities which were not indicated on the plans or in these Special Provisions or were located in a position substantially different from that indicated on the plans or in these Special Provisions, or as a direct result of utilit y or other non-highway facilities not being rearranged as herein provided (other than delays in connection with rearrangements made to facilitate the Contractor's construction oper ations or delays due to a strike or labor dispute). These delays will be considered right of way delays within the meaning of Section 8-1.09, "Right of Way Delays," and compensation for the delay will be determined in conformance with the provisions in Section 8-1.09. The Contractor shall be entitled to no other compensation for that delay.

Any delays to the Contractor's operations as a direct result of utility or other non-highway facilities not being rearranged as provided in this Section 8-1.10, due to a strike or labor dispute, will entitle the Contractor to an extension of time as provided in Section 8-1.07, "Delays." The Contractor shall be entitled to no other compensation for that delay.

Add the following to the end of Section 8-1.13:
8-1.13A TERMINATION BY THE CITY FOR CAUSE
8-1.13A(1) Grounds
The City shall have the right to terminate the Contractor’s performance of the Work, in whole or in part, if:

1. Contractor fails to pr omptly commence the Work or unnecessarily or unreasonably delays the Work or improperly discontinues the diligent prosecution of the Work or abandons the Work;

2. Contractor refuses or fails to suppl y skilled supervisory personnel, an adequate number of properly skilled workers, proper materials, or necessary equipment to perform the Work in strict accordance with the Contract Documents, and the latest accepted schedule;

3. Contractor fails to make prompt pay ment of amounts properly due Subcontractors after receiving payment from the City;

4. Contractor disregards applicable laws, statutes, ordinances, codes, rules, regulations, or lawful orders of a public authority;
249

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-49

5. Contractor fails to resume perform ance of Work which has been suspended or stopped, within a reasonable time after receip t of notice from the City to do so or (if applicable) after cessation of the event preventing performance;

6. Any representation or warr anty made by Contractor in the Contract Documents or any certificate, schedule, instrument, or other document delivered by Contractor pursuant to the Contract Documents shall have been false or materially misleading when made;

7. After commencement of t he Work the City becomes awar e that the Contractor is using an ineligible Contra ctor, Subcontractor, or s upplier who was barred from performing work or providing materials or se rvices on City projects at the time of Bid;

8. Contractor fails to make payment to Subcontractors for materials or labor in accordance with the respective Contract Documents and applicable law;

9. The Contract is assigned or the Work is sublet otherwise than as specified in the Contract Documents;

10. Contractor otherwise is guilty of breach of a provision of the Contract Documents; or

11. Contractor materially fails to execut e the Work in accordance with the Contract Documents or, in the City’s opinion, is violating any of the terms of the Contract or is not executing the Contract in good faith or is not following instructions of the City as to additional force necessary in the opinion of the City for it s completion within the required time.
8-1.13A(2) City’s Rights Upon Termination of Contract for Cause: Notice to Cure and Notice of Termination for Default
When any of the reasons spec ified above exist, the City may, in addition to and without prejudice to any other rights or remedies of the City, issue a written notice to cure the default to the Contractor and its surety. T he Contractor shall commence satisfactory corrective actions within five (5) working days after receipt of the notice to cure. If the Contractor fails to commence satisfactory corrective work within 5 working days after receipt of the notice to cure, or to diligently continue satisfactory and timely correction of the default thereafter, the City will advise the performance bond surety of the default and that surety will be given fifteen (15) calendar days to arrange for completion of the Work in accordance with the Contract Document s by another Contract or or Contractors satisfactory to the City. Shoul d the surety fail to effect satisfactory arrangements within said 15-day period, the City shall have the right to issue a notice of termination for default and to:

1. Exclude the Contract or from the Site;

2. Take possession of the Site and of all materials, equipment, tools and construction equipment, and machinery thereon owned by the Contractor;

3. Suspend any further payments to Contractor;

4. Accept assignment of subcontra cts pursuant to Section 5-1.13C; and

5. Finish the Work by whatever r easonable method the City may deem expedient. 250

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-50
When the City terminates the Contractor’s performance of the Work for one of the reasons stated in this Sectio n 8-1.13, the Contractor shall not be entitled to receive further payment until the Work is finished.

The City shall charge the cost to complete the Work, including, but not limited to, protection, investigation, labor, servic es, equipment, material s, permits, fees, supervisory, and administrative costs to Cont ractor and its performance bond surety. If the unpaid balance of the Contract Price is less than all costs of finishing the Work, including compensation for the City’s services and expenses made necessary thereby, and other damages incurred by the City and not expressly waiv ed, the Contractor shall pay the difference to the City. This obligation for payment shall survive termination of the Contract. If the unpaid balance of the Contract Price is greater than all costs of finishing the Work, including compensation for the City’s services and expenses made necessary thereby, the Contractor shall receive payment for Work properly performed by Contractor for which payment was not made previously; any excess amounts shall be retained by the City.

Upon receipt of the written not ice of termination for default, the surety shall immediately assume all rights, obligations and liabilities of the Contractor under t he Contract. If the surety fails to protect and maintain the work site, the City may do so, and may recover all costs incurred. The surety shall notify the City that it is assuming all rights, obligations and liabilities of the Contractor under the Contract. Within 15 working days of receipt of the written notice of termination for default, the Surety shall submit to the City a written plan detailing the course of action it intends to take to re medy the default. The City will review the plan and notify the surety if the plan is satisfactory. If the surety fails to submit a satisfactory plan, or if the surety fails to maintain progress according to the plan accepted by the City, the City may, upon 48 hours written notice, exclude the Surety from the premises, take possession of all material and equipment, and complete the Work in any way the City deems to be expedient. The co st of completing the Work by the City shall be charged against the surety and may be deducted from any monies due, or which would become due, the surety. If the amounts due under the Contract are insufficient for completion, the surety shall pay to the Cit y, within 30 days after the City submits an invoice, all costs in excess of the remaini ng Contract Price. The Surety will be paid for completion of the Work in accordance with Section 9 below, less the value of damages caused to the City by acts of the Contractor.
8-1.13A(3) Erroneous Termination
If it has been adjudicated or otherwise det ermined that the City has erroneously or negligently terminated the Contractor for cause, then said termination shall automatically convert to a termination by the City for convenience as set forth in Section 8-1.13C. 8-1.13A(4) Acceptance of Incomplete or Non-Conforming Work In lieu of the provisions of this Section for terminating the Contractor’s performance, the City may pay the Contractor for the portion of Work completed according to the provisions of the Contract Documents and may treat the incomplete Work as if they had never been included or contemplated by th is Contract, in which case the Contract Price will be reduced by the value of the deleted Work determined
in accordance with Section 4-

1.05M. The City may also exercise its rights under Section 6-3.07F relating to Acceptance 251

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-51
of Nonconforming Work. No claim under this provision will be allowed the Contractor for overhead or prospective profits on Work not completed by the Contractor. 8-1.13A(5) Adequate Financial Assurances
It is recognized that if Contractor is adjudged a bankrupt or makes a general assignment for the benefit of creditors, or if a receiver is appointed for the benefit of its creditors, or if a receiver is appointed on account of Contractor’s insolvency, this could impair or frustrate Contractor’s performance of the Work. Accordingly, it is agreed that upon the occurrence of any such event, the City shall be entitled to request of Contractor, or its successor in interest, adequate assurance of future perfo rmance in accordance with the terms and conditions hereof. Failure to comply with su ch request within five (5) calendar days of delivery of the request shall entitle the City to terminate the Contract and to the accompanying rights set forth above. P ending receipt of adequate occurrence of performance and actual performance in accor dance therewith, the City shall be entitled to proceed with the Work with its own forces or with other Contractors on a time and material or other appropriate basis, the cost of which will be backcharged against the Contract Price.
8-1.13B TERMINATION BY THE CITY FOR CONVENIENCE
The City may, at any time, terminate the Contractor’s performance of the Work, in whole or in part, for the City’s convenience without regard to Contractor’s fault or breach upon fourteen (14) calendar days’ written notice to Contractor.

In the event that the City terminates Cont ractor’s performance of the Work for convenience, Contractor agrees to waive any claims for damages, including, but not limited to, home office overhead, loss of anticipated profits on account thereof, and as the sole right and remedy of Cont ractor, the City shall pay Contractor in accordance with Section 8-1.13G below. The provisions of the Contract, which by their nature survive final acceptance of the Work, shall remain in full force and effect after such termination to the extent provided in such provisions.
8-1.13C Contractor’s Duties Upon Termination
Upon receipt of written notice from the City of such termination for cause or for the City’s convenience, the Contractor shall, unless the notice directs otherwise, do the following:

1. Cease performance of the Work to the extent specified in the notice;

2. Cooperate with the City to secure the site and demobilize in a safe and orderly fashion;

3. Take actions necessary, or that t he City may direct, for the protection and preservation of the Work;

4. Except for Work directed to be performed in the notice, incur no further costs and enter into no fu rther subcontracts and purchase orders;

5. If requested by the City, assign to the City, in the manner and to the extent directed, all of the right, title and intere st to the Contractor under the subcontracts, and the City shall have no liability for acts, omissions or causes of action resulting therefrom which accrued 252

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-52
prior to the date of termination a nd assignment, which liability shall remain with the Contract; and

6. Turn over to the City, as soon as possible, but not later than thirty (30) days after receipt of such term ination notice, the originals of all of the Contractor’s records, files, documents, drawings and any other items relating to the project, whether located on the project site, at the Contractor’s office or elsewhere.

Replace Section 8-1.14E with:
8-1.14E PAYMENT ADJUST MENT FOR TERMINATION
If the Department issues a termination notice, the Engineer determines the payment for termination during the performance period, from contract approval date to contract acceptance date, based on the following:

1. Direct cost for the work performed:

1.1. Including:

1.1.1. Mobilization

1.1.2. Demobilization

1.1.3. Securing the job site for termination

1.1.4. Losses from the sale of materials

1.2. Not including:

1.2.1. Cost of materials you keep

1.2.2. Profit realized from the sale of materials

1.2.3. Cost of material damaged by:

1.2.3.1. Act of God

1.2.3.2. Act of a public enemy

1.2.3.3. Fire

1.2.3.4. Flood.

1.2.3.5. Governor-declared state of emergency

1.2.3.6. Landslide

1.2.3.7. Tsunami

1.2.4. Other credits

2. Cost of remedial work, as estimated by the Engineer, is not reimbursed.

3. Allowance for profit not to exceed 4 percent of the cost of the work performed where a likelihood of having made a profit had the Contract not been terminated is shown.
253

2025 ARTERIAL PAVEMENT PROJECT
CITY PROJECT NO. N/A
SP-53

4. Material handling costs for material returned to the vendor or disposed of as ordered.

5. Costs in determining the payment adjustment due to the termination, excluding attorney fees and litigation costs.

6. Overhead costs.

Termination of the Contract does not relieve the surety of its obligation for any just claims arising out of the work performed.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

9 PAYMENT
Add to Section 9-1.02:
9-1.02 MEASUREMENT
In addition to the requirements of Section 9-1.02 MEASUREMENT of the State Standard Specifications, the following shall apply:

Payment for all work bid at a price per unit of measurement will be based upon actual quantities of work as measured upon completion. The City does not expressly or by implication agree that the actual amount of work or materials of any class will correspond to the estimated quantities given in the proposal. The Contractor shall make no claim for anticipated profits, or loss of profit, for damages, or for any extra payment whatever because of any difference between the amount of work actually done or materials furnished and the estimated amount.

Add to Section 9-1.03:
9-1.03 PAYMENT SCOPE
In addition to Section 9-1.03 PAYMENT SCOPE of the State Standard Specification, the items bid on a “lump sum” basis shall result in a complete structure, operating plant, or system, (including all warranty documents and product and operating manuals) in satisfactory working condition in respect to the functional purpose of the installation and no extra compensation will be allowed for anything omitted but implied. Full compensation for additional materials and labor, whether or not shown on the drawing or specified in the State Standard Specifications or these Special Provisions, which are necessary to complete all the work will be considered as included in the lump sum price paid for the work, and no additional compensation will be allowed.
9-1.03A PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS
A prime contractor or subcontractor shall pay any subcontractor not later than 10 days of receipt of each progress payment in accordance with the provision in Section 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. The 10 days is applicable unless a longer period is agreed to in writing.