Agenda Item D.2
CPMS DISCUSSION/ACTION ITEM
Meeting Date: February 4, 2025
____________________________________________________________ TO: Mayor and Councilmembers
FROM: Luz “Nina” Buelna, Public Works Director
PREPARED BY: Daniel Virgen, Assistant Engineer
SUBJECT: Authorization to Advertise for Bids for the 202 5 Residential Resurfacing and Arterial Pavement Projects
RECOMMENDATION:
Authorize staff to advertise a notice inviting construction bids for the 2025 Residential Resurfacing and Arterial Pavement Projects.
BACKGROUND:
The City of Goleta owns and manages approximately 85 centerline miles of roadways that serve the transportation needs of all roadway users. Roadways include medians, curbs, gutters, sidewalks, landscaping, and traffic signs and signals. The City uses the Pavement Management Program (PMP) to help preserve its roadway assets, which involves monitoring pavement conditions and developing scheduled maintenance activities and projects accordingly. Additionally, the PMP is an essential planning resource, assisting staff in establishing a priority list of roadways for the City's annual pavement projects. Pavement projects can range from resurfacing to complete reconstruction.
The City -hired consultant , Pavement Engineering, Inc. (PEI ), evaluated the City’s roadway network and provided an updated assessment allowing the City to calculate the current pavement condition index (PCI) and run budget scenarios to better understand fiscal impacts and needs. The PCI is a visual representation of a road's condition, ranked on a scale from 1 to 100, with 1 being the worst and 100 being the best. The City’s PCI is currently 58, following the completion of the 2023 Paving Project in the 2024 construction season. Public Works will focus on consistently delivering annual pavement projects to maintain and enhance our streets' condition.
Two pavement projects have been designed to extend the lifespan of the City’s roadways.
The 2025 Arterial Pavement Project targets streets requiring rehabilitation treatment. The 2025 Residential Resurfacing Project focuses on preventi ve maintenance by applying resurfacing treatments such as crack seal and slurry seal. These treatment applications will seal the pavement surface and protect the existing asphalt surface against water 1 Meeting Date: February 4, 2025
intrusion, prevent oxidation of the existing asphalt surface, and provide a new surface with improved skid resistance. Such preventive maintenance will extend the pavement infrastructure's life and improve road users' safety while reducing future repair costs. This approach is more economical to maintain pavement than to repair or replace it after significant damage occurs. Separating both projects can lower the cost of traffic control, subcontractor work, and material markups.
Both projects employ the PMP critical point management approach to choose and prioritize which streets will receive treatment. This critical approach considers pavements at various stages on the deterioration curve rather than focusing solely on those in the best or worst condition. Doing so effectively optimizes the limited budget by ensuring the appropriate treatment is applied to the proper pavement at the right time.
Staff have included the Storke Road/Hollister Avenue Transit, Bike/Ped, and Median Improvements Project (Project N o. 9062) as a bid alternative to the 2025 Arterial Pavement Project to leverage construction bids at a larger scale and use Measure A grant funds awarded to this project. The plans and specifications have been completed as the project aims to improve safety conditions along the existing corridor on Storke Road and at the Storke Road and Hollister Avenue intersection. This project will merge the two southbound bus stops on Storke Road into one, implement median improvements, and improve traffic and bike patterns.
DISCUSSION:
2025 Arterial Pavement Project
This project involves replacing pavement with hot mix asphalt, upgrading American with Disabilities Act (ADA)-compliant curb ramps, and updating traffic striping and markings.
It addresses the pavement replacement needs in a residential neighborhood to prepare the road for the upcoming 2025 Residential Resurfacing Project. The work includes a base bid and additional roadway segments listed as additive alternates, ensuring the budget is utilized to its fullest potential.
The roadway segments for the base and alternative bid locations are shown on the location map (see Attachment 1). These locations include repaving portions of:
Calle Real
Northeast Goleta Neighborhood
Berkeley Road
Hollister Avenue
South Fairview Avenue
Storke Road
Los Carneros Road
2 Meeting Date: February 4, 2025
2025 Residential Resurfacing Project
This project includes a new pavement surface of slurry seal and replacing traffic striping and markings. The street segments that will be slurry sealed are portions of the Northeast Goleta Neighborhood (See Attachment 4).
Construction for both projects is anticipated to begin in late summer 2025 and be completed by early fall 2025. By bidding the projects around the same time as separate contracts, the City can leverage construction firms to reduce mobilization costs and potentially secure lower bid prices. The bid documents have been structured to ensure that the 2025 Arterial Pavement Project begins before the 2025 Residential Resurfacing Project, addressi ng pavement replacement needs before slurry sealing . All roads will remain open during construction , with work hours adjusted based on each roadway’s traffic characteristics. Due to high daytime traffic volumes on certain roads, nighttime work will likely be required.
Public Outreach
Resurfacing and rehab ilitating neighborhood streets can cause inconvenience s for residents. For instance, there may be instances when on-street parking will be temporarily restricted during the project. Some residents may also be concerned about whether they will still have access to their homes or if garbage collection will conti nue as scheduled.
We recognize these concerns and are committed to addressing the community's needs.
As a result, we prioritize public outreach in our annual resurfacing program. Below is our communication plan:
1. About two months before the planned work, w e send a letter to each resident in the project area explaining the planned work, the type of pavement treatment that will be used, what the residents can expect before, during, and after the project.
We will invite the residents to attend an evening meeti ng scheduled by City staff.
At that meeting, City staff will provide the residents with an overview of our street maintenance program and what the project in their neighborhood would entail. We then answer any questions the residents may have. We hold thi s meeting about one month before the planned work.
2. About two weeks before the planned work, a letter is sent to each resident in the project area, reminding them of the upcoming work. The letter includes information very similar to what was included in the first letter and a color-coded map showing which streets are planned to be slurry sealed on which dates.
3. Five working days before work begins on any given street, the contractor hangs a notice on the door at each residence listing the street, date, and times of prohibited parking.
4. 72 hours before the work is to begin on any given street, the contractor places temporary “no parking” signs mounted on barricades along the street. These signs contain the days and times when parking will be prohibited. 3 Meeting Date: February 4, 2025
FISCAL IMPACTS:
2025 Arterial Pavement Project
The engineer's estimate for the construction cost of the base bid for the 2025 Arterial Pavement Project is $ 8,100,190, while the estimated cost for the additive alternates 1 through 5 is $7,812,775. The combined construction cost of the base bid and the additive alternates is approximately $15,912,965.
Table 1 shows the total estimated project costs and base bid construction costs.
Table 1: Project Cost Estimates for the 2025 Arterial Pavement Project (Base Bid)
Project Components Estimated Costs
Design (Consultant) $234,104
Construction (Base Bid) $8,100,190
Construction Contingency/CCO $1,620,038
CM (Consultant) $1,749,641
Staff Time $87,000
Total: $11,790,973
Table 2: Proposed Construction Engineer's Estimates for the 2025 Arterial Pavement Project (Additive Alternates)
Project Components Estimated Costs
Construction (additive alternates) $7,812,775
2025 Residential Resurfacing Project
The engineer's estimate for the construction cost of the 2025 Residential Resurfacing Project is $765,142. The table below details the total estimated project costs.
Table 3: Project Cost Estimates for the 2025 Residential Resurfacing Project
Project Components Estimated Costs
Design (Consultant) $41,312
Construction $765,142
Construction Contingency/CCO $153,028
CM (Consultant & Staff) $165,270
Staff Time $54,000
Total: $1,178,752
4 Meeting Date: February 4, 2025
Based on the engineer’s estimate, s ufficient funds are available to cover the base bids for both projects , but the selection of the bid alternative s will depend on the bid pricing received. Public Works staff is collaborating with the Finance Department to identify additional funding sources as needed. The pro ject funding will utilize a combination of General Fund, Gas Tax, Local Surface Transportation Program (LSTP), Measure A, and Road Maintenance and Rehabilitation Account—Senate Bill 1 (RMRA-SB1) resources.
ALTERNATIVES:
The City Council may elect not to authorize staff to advertise for construction bids for the 2025 Residential Resurfacing and Arterial Pavement Projects. Doing so would delay the project schedule and construction.
Legal Review By: Isaac Rosen, Acting City Attorney
Approved By: Robert Nisbet, City Manager
ATTACHMENTS:
1. 2025 Arterial Pavement Project Location Map
2. 2025 Arterial Pavement Project – Plans
3. 2025 Arterial Pavement Project – Specifications
4. 2025 Residential Resurfacing Project Location Map
5. 2025 Residential Resurfacing Project – Plans
6. 2025 Residential Resurfacing Project – Specifications
7. Pavement Management Program PowerPoint Presentation
5 ATTACHMENT 1
2025 ARTERIAL PAVEMENT PROJECT LOCATION MAP
6 PACIFIC OCEAN
NO SCALE
7 ATTACHMENT 2
2025 ARTERIAL PAVEMENT PROJECT PLANS
8 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:55 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
CONSTRUCTION DRAWINGS
2025 ARTERIAL PAVEMENT PROJECT
FOR
VARIOUS STREETS
LOCATION PLAN
NOT TO SCALE
217
SHEET INDEX
SHEET
NUMBER
STREET NAME /
SHEET DESCRIPTION
BASE BID /
BID ALTERNATE
1 TITLE SHEET -
2 GENERAL NOTES -
3 TYPICAL SECTIONS -
4 DETAILS -
5 - 8 CALLE REAL
(NORTH KELLOGG AVENUE TO CITY LIMITS) BASE BID
9 - 12 BERKELEY ROAD
(NORTH FAIRVIEW AVENUE TO SYLVAN DRIVE) BASE BID
13 - 26 NORTHEAST GOLETA NEIGHBORHOOD BASE BID
27 - 32 HOLLISTER AVENUE
(CATHEDRAL OAKS ROAD TO PEBBLE BEACH DRIVE) BASE BID
33 - 34 HOLLISTER AVENUE
(CAMINO REAL MARKETPLACE TO STORKE ROAD) BASE BID
35 - 36 SOUTH FAIRVIEW AVENUE
(SOUTH FAIRVIEW AVENUE TO NORTH END) BASE BID
37 - 38 STORKE ROAD
(HOLLISTER AVENUE TO BOLLAY DRIVE) BID ALTERNATE 1
39 - 40 CALLE REAL
(CALAVERAS AVENUE TO SONOMA AVENUE) BID ALTERNATE 2
41 - 44 BERKELEY ROAD
(SYLVAN DRIVE TO EAST END) BID ALTERNATE 3
45 LOS CARNEROS ROAD
(HOLLISTER AVENUE TO CASTILIAN DRIVE) BID ALTERNATE 4
46 - 48 CALLE REAL
(ROCHESTER WAY TO SALISBURY AVENUE) BID ALTERNATE 5
49 - 52 CURB RAMP SUMMARY TABLES & PAY ITEMS -
53 - 57 CURB RAMP ENLARGEMENTS -
THE STORKE ROAD / HOLLISTER AVE. TRANSIT, BIKE /
PED, AND MEDIAN IMPROVEMENTS (30 TOTAL SHEETS)
CITY PROJECT
NUMBER 9062
UTILITY CONTACT LIST
UTILITY CONTACT PHONE NUMBER
GOLETA SANITARY
DISTRICT LUIS ASTORGA 805.967.4519
GOLETA WEST
SANITARY DISTRICT JUAN RAMIREZ 805.968.2617
GOLETA WATER
DISTRICT DAN BROOKS 805.964.6761
SOUTHERN CALIFORNIA
GAS COMPANY SHAWN LEE 805.535.5901
TITLE SHEET
9 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:14 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
GENERAL NOTES
GENERAL HMA & PCC CONSTRUCTION NOTES:
1. PRIOR TO INSTALLATION OF NEW CONCRETE FACILITIES, CONTRACTOR SHALL COORDINATE WITH CITY REPRESENTATIVE FOR TRIMMING OR REMOVA L OF PRIVATE LANDSCAPE PLANTINGS. NO PLANT MATERIAL SHALL BE ALTERED OR OTHERWISE REMOVED WITHOUT PRIOR APPROVAL OF THE CITY.
2. CURB RAMP SHALL BE CONSTRUCTED BASED ON CALTRANS 2018 STANDARD PLANS A88A & A88B AND THE PUBLIC RIGHTS OF WAY ACCESSIBILITY G UIDELINES (PROWAG). REFER TO STANDARD PLANS A88A & A88B FOR ADDITIONAL DETAILS & INFORMATION.
3. CONCRETE FACILITIES SHALL BE CONSTRUCTED PER THE SEPTEMBER 2011 EDITION OF THE SANTA BARBARA COUNTY STANDARD DETAILS (UNLESS OTHERWISE INDICATED):
x CURB & GUTTER* . . . . . . . . . . . . . . . . . . . . . . . . . #4-030 & 4-045 x SIDEWALK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4-045, 5-010 & 5-040 x TYPE A CURB . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4-030 x CROSS-GUTTER & SPANDREL . . . . . . . . . . . . . . #4-020 x SIDEWALK UNDERDRAIN . . . . . . . . . . . . . . . . . . #3-060 x DRIVEWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4-040 *CURB & GUTTER WIDTH SHALL WIDEN TO A 24" GUTTER PAN IN FRONT OF CURB RAMP LANDING THEN TAPER BACK TO THE ORIGINAL WIDTH UNLESS OTHERWISE NOTED ON PLANS.
5. PCC SIDEWALKS AND CURB RAMPS SHALL BE MIN. 6" THICK.
6. ALL FACES OF NEW OR RECONSTRUCTED CURBS SHALL BE MIN. 6".
7. ALL SAWCUTTING THROUGH CONCRETE & ASPHALT PAVEMENT SHALL BE SQUARE AND EXTEND FULL-DEPTH OF THE MATERIAL. SAWCUTS IN CONCRET E SHALL ALWAYS BE ON AN EXISTING JOINT LINE UNLESS OTHERWISE ALLOWED BY THE CITY'S REPRESENTATIVE PRIOR TO CUTTING. ANY CHIPPED, BROKEN OR
OTHERWISE IRREGULAR CONCRETE OR ASPHALT PAVEMENT EDGES SHALL BE RE-SAWCUT AS DIRECTED BY THE CITY'S REPRESENTATIVE PRIOR TO REPLACING CONCRETE OR HOT-MIX ASPHALT MATERIAL.
8. NEW CONCRETE FACILITIES SHALL BE DOWELED & EPOXIED TO EX. CONCRETE USING 18" LONG #4 BARS, EMBEDDED MINIMUM 9" AND SPACED @ 1 2" O.C. MAX.
NEAREST DOWEL TO OUTERMOST FACE OF CONCRETE SHALL BE NO CLOSER THAN 3" UNLESS OTHERWISE DIRECTED BY CITY REPRESENTATIVE.
9. HMA REPLACEMENT AGAINST NEW CONCRETE SHALL EXTEND AT LEAST 2' FROM THE EDGE OF THE CONCRETE, AND EXTEND TO A DEPTH OF 0.67' O R MATCH EX., WHICHEVER IS GREATER.
10. SEVERAL REMOVE & REPLACE AREAS WITHIN THE PAVEMENTS INCLUDE PRUNING & REMOVING EXISTING TREE ROOTS. IN ADDITION, THE CONTRAC TOR SHALL ANTICIPATE PRUNING & REMOVING EX. TREE ROOTS AT ALL CONCRETE FACILITIES TO BE CONSTRUCTED OR REMOVED & REPLACED. NO TREE ROOTS SHALL BE CUT WITHOUT PRIOR REVIEW AND APPROVAL BY CITY ARBORIST.
11. IF NECESSARY, TREE CANOPIES SHALL BE TRIMMED AS NEEDED TO PROVIDE AT LEAST 15' OF CLEARANCE ABOVE ROADWAY SURFACES. TREE CANOPIES SHALL NOT BE TRIMMED WITHOUT PRIOR REVIEW AND APPROVAL BY CITY ARBORIST.
12. LANDSCAPE RESTORATION SHALL CONSIST OF SALVAGING & REPLACING LANDSCAPING MATERIALS BEHIND NEW CONCRETE CONSTRUCTION. THESE MATERIALS MAY INCLUDE BUT ARE NOT LIMITED TO: BARK MULCH, DECORATIVE ROCK, COBBLE OR BOULDERS, CONCRETE PAVERS, BRICK, TURF, & DECORATIVE EDGING.
CONTRACTOR SHALL DISTURB EX. LANDSCAPE MATERIALS TO THE MINIMUM AMOUNT POSSIBLE DURING DEMOLITION, LAYOUT & CONSTRUCTION OF RAMPS.
WHERE MATERIALS MUST BE DISTURBED OR REMOVED, CONTRACTOR SHALL CAREFULLY SALVAGE & STORE ON-SITE SAID MATERIALS UNTIL CURB RAMP
CONSTRUCTION IS APPROVED BY THE CITY'S REPRESENTATIVE, AFTER WHICH SALVAGED MATERIALS SHALL BE RESTORED TO THEIR ORIGINAL PLACEMENT & CONDITION. IF EXISTING MATERIALS CANNOT BE SALVAGED, CONTRACTOR SHALL PROCURE & INSTALL W/SAME MATERIALS.
13. LANDSCAPE RESTORATION MAY ALSO INCLUDE REPAIR OR REPLACEMENT OF DAMAGED IRRIGATION FACILITIES CAUSED BY THE CONTRACTOR'S EFF ORTS.
CONTRACTOR SHALL EXERCISE REASONABLE CAUTION DURING DEMOLITION & CONSTRUCTION TO AVOID DAMAGING IRRIGATION DRIPLINES, LATERAL LINES, VALVES, POP-UP SPRINKLERS, ETC. ANY DAMAGED IRRIGATION FACILITIES SHALL BE REPAIRED OR RESTORED TO WORKING ORDER TO THE SATISFACTION OF THE CITY'S REPRESENTATIVE.
14. ALL EXISTING FACILITIES ADJACENT TO ZONE OF CONSTRUCTION SHALL BE PROTECTED AT ALL TIMES BY THE CONTRACTOR TO AVOID DAMAGE T O SAID FACILITIES. IF IT IS THE CONTRACTOR'S OPINION THAT ITEM(S) CANNOT BE PROTECTED IN PLACE DURING THE WORK, CONTRACTOR SHALL NOTIFY THE CITY'S REPRESENTATIVE IN ADVANCE OF STARTING THE WORK. ANY ITEMS WHICH ARE TEMPORARILY RELOCATED TO AVOID DAMAGE SHALL BE REPLACED TO THEIR ORIGINAL LOCATION & CONDITION AT THE COMPLETION OF THE WORK. ANY FACILITIES WHICH ARE FOUND TO BE MISSING OR DAMAGED SHALL BE REPLACED AT THE CONTRACTOR'S SOLE EXPENSE & TO THE SATISFACTION OF THE CITY'S REPRESENTATIVE.
15. EXISTING UTILITY LIDS WITHIN AREA OF WORK SHALL BE ADJUSTED TO FINISHED GRADE UNLESS OTHERWISE INDICATED.
16. NOTIFY ENGINEER OF RECORD IF DISCREPANCIES ARE FOUND BETWEEN PROJECT DOCUMENTS AND ACTUAL CONDITIONS PRIOR TO CONTINUATION O F WORK.
17. COUNTER SLOPES OF ADJOINING GUTTERS AND ROAD SURFACES IMMEDIATELY ADJACENT TO AND WITHIN 2' OF THE CURB RAMP LANDING SHALL N OT BE GREATER THAN 5%.
ABBREVIATIONS
AB AGGREGATE BASE
BEG. BEGIN
C&G CURB & GUTTER
CONT. CONTINUED
EP EDGE OF PAVEMENT
EX. EXISTING
FL FLOWLINE
GB GRADE BREAK
HMA HOT MIX ASPHALT
LF LINEAR FEET
MAT'L MATERIAL
MAX. MAXIMUM
MIN. MINIMUM
NO. NUMBER
N.S. NO SLOPE
NTS NOT TO SCALE
O.S. ON CENTER
PCC PORTLAND CEMENT CONCRETE
R&R REMOVE & REPLACE
R.C. RELATIVE COMPACTION
SF SQUARE FEET
STA STATION
SW SIDEWALK
TC TOP OF CURB
TP TOP OF PAVEMENT
W/ WITH
LEGEND
REMOVE & REPLACE 3" HMA
FULL DEPTH RECLAMATION (SEE PLAN FOR TYPICAL SECTION)
COLD PLANE & REPLACE (SEE PLAN FOR TYPICAL SECTION)
COLD PLANE & REPLACE (TYPICAL SECTION NO. 4)
COLD PLANE & REPLACE (TYPICAL SECTION NO. 4)
TYPE A1 KEYCUT
TYPE B1 KEYCUT
CRACK SEAL & MICRO-SURFACING WITH BLACK ROCK
PROPOSED PCC IMPROVEMENTS
TRANSVERSE PAVING LIMIT
REMOVE & REPLACE TRAFFIC LOOPS
ELECTRICAL VAULT (EX.)
WIRELESS TRAFFIC SENSOR (EX.)
BORING LOCATIONXX
STORM DRAIN MANHOLE (EX.)
SANITARY SEWER MANHOLE (EX.)
PROPOSED STORKE ROAD MODIFIED MEDIAN
SEWER CLEANOUT (EX.)
TELECOMMUNICATIONS MANHOLE (EX.)
BLUE RETROREFLECTIVE PAVEMENT MARKER
FIRE HYDRANT (EX.)
SURVEY MONUMENT (EX.)
SURVEY NAIL (EX.)
WATER VALVE (EX.)
GAS VALVE (EX.)
XX CURB RAMP REFERENCE NUMBER (SEE SHEETS 49 - 52 FOR QUANTITIES & NOTES)
REMOVE & REPLACE TYPE A HMA DIKE
CONCRETE EDGE (EX.)
PAVEMENT EDGE (EX.)
HMA DIKE (EX.)
INSTALL SHOULDER BACKING
R PRUNE & REMOVE TREE ROOTS
GENERAL NOTES:
1. STATIONING IS SHOWN ON PLAN SHEETS AND FOR REFERENCE ONLY UNLESS OTHERWISE INDICATED.
2. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING ALL STRIPING WITHIN LIMITS OF WORK. STRIPING IS TO MATCH EXISTING UNLESS OTHERWISE SHOWN ON PLANS OR DIRECTED BY THE CITY. CONTRACTOR SHALL TIE DOWN LOCATION OF ALL STRIPING PRIOR TO REMOVAL.
3. THE CONTRACTOR SHALL REMOVE EXISTING STRIPING AS NEEDED PRIOR TO PLACEMENT OF OVERLAYS.
4. FOR STREETS WHERE ONLY DIGOUTS ARE BEING PERFORMED, THE CONTRACTOR SHALL REPLACE ANY STRIPING REMOVED THE DIGOUTS IN KIND WIT H PAINT.
5. NOT ALL UTILITIES ARE SHOWN ON PLANS. CONTRACTOR SHALL TIE DOWN EXISTING UTILITIES PRIOR TO OVERLAY, COLD PLANE, FULL DEPTH R ECLAMATION, OR REMOVE AND REPLACE WORK.
6. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (811) AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF OF
CONSTRUCTION TO ALLOW UTILITY OWNER TO MARK THE LOCATION OF THEIR RESPECTIVE UNDERGROUND FACILITIES/UTILITIES, PUBLIC OR PRIVATE, SHOWN OR NOT ON THESE PLANS.
7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS TO COMPLETE WORK.
8. FOR AREAS TO BE REMOVED & REPLACED, THE CONTRACTOR SHALL ONLY REMOVE MATERIAL QUANTITIES THAT CAN BE REPLACED DURING THE SAME WORK DAY.
9. THE CONTRACTOR SHALL CONTACT THE ENGINEER AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF PAVING TO ALLOW THE ENGI NEER TO MARK THE LIMITS OF PAVING AND LOCATIONS OF REMOVE & REPLACE AREAS.
10. CONTRACTOR SHALL DEVELOP AN HMA PAVING PLACEMENT PLAN THAT WILL ENSURE THAT NO LONGITUDINAL JOINTS REMAIN UNFINISHED IN THE SAME DIRECTION BETWEEN WORK SHIFTS DURING FINISH COURSE PLACEMENT.
11. CONTRACTOR SHALL REMOVE ANY EXISTING ASPHALT MATERIAL FROM GUTTER PAN WITHIN PROJECT LIMITS; CONTRACTOR SHALL PROTECT EXISTING PCC FACILITIES.
12. CONTRACTOR SHALL PROTECT VERTICAL EDGES ON LIMITS OF WORK. ANY BROKEN EDGES SHALL BE RE-CUT TO PROVIDE CLEAN STRAIGHT LINE.
13. CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION WASTE IN A LEGAL MANNER.
REMOVE & REPLACE PCC CURB & GUTTER
REMOVE & REPLACE PCC CURB
REMOVE & REPLACE SIDEWALK UNDERDRAIN
1-INCH HMA LEVELING COURSE (SEE PLAN FOR TYPICAL SECTION)
PAVEMENT TRANSITION
REMOVE & REPLACE 4" HMA
REMOVE & REPLACE 6" HMA
REMOVE & REPLACE 8" HMA
STRIPING NOTES:
1. ALL STRIPING AND PAVEMENT MARKING DETAILS AND LAYOUTS SHALL CONFORM TO THE CURRENT STATE OF CALIFORNIA
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS AND THE STATE OF CALIFORNIA STANDARD PLANS, UNLESS OTHERWISE SPECIFIED.
2. LANE DIMENSIONS ARE FROM TOP OF CURB OR EDGE OF PAVEMENT TO CENTER OF STRIPE DETAIL.
3. ALL LONG LINE STRIPING, PAVEMENT MARKINGS/LEGENDS, CROSSWALK, AND LIMIT LINES SHALL BE THERMOPLASTIC EXCEPT ON PCC SURFACES.
4. BLUE TWO-WAY REFLECTIVE PAVEMENT MARKERS SHALL BE INSTALLED IN THE STREETS ADJACENT TO FIRE HYDRANTS IN
ACCORDANCE WITH CITY OF GOLETA STANDARD FOR PLACEMENT OF FIRE HYDRANT MARKERS
INSTALL ROADSIDE SIGN
CRACK SEAL & SLURRY SEAL (TYPE II)
10 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:14 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
TYPICAL SECTIONS
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:
1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.
2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.
3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.
4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.
5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"
0.83'
1.25'
NTS
TYPICAL SECTION NO. 6
0.29'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.
SHOULDER BACKING
PER DETAIL
HMA LIFT THICKNESSES:
1. 0.08' HMA-SP50 (PG 64-10) LEVELING COURSE.
2. 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
TYPICAL SECTION NO. 9
NTS
0.63'
MEDIAN
WIDTH
(VARIES)
0.63'
HMA LIFT THICKNESSES:
1. PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE.
2. PLACE 0.21' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE.
3. PLACE 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE.
NTS
TYPICAL SECTION NO. 2
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.
TAPER FROM 0.17' TO 0.27' OVER 5'.
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
NOTE:
1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,
PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
NTS
TYPICAL SECTION NO. 8
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.21' HMA-SP50 (PG 64-10) SURFACE COURSE. TAPER
FROM 0.17' TO 0.21' OVER 5'.
NTS
TYPICAL SECTION NO. 4
0.67'0.33'
EB LANE
(VARIES)
WB LANE
(VARIES)
HMA LIFT THICKNESSES:
1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).
2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).
3. 0.16' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).ALTERNATE PAVEMENT EDGE 1
APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
R&R (SEE PLAN FOR
LOCATION & DEPTH)
R&R (SEE PLAN FOR
LOCATION & DEPTH)
ALTERNATE PAVEMENT EDGE
HMA DIKE,
TYPE A
NTS
TYPICAL SECTION NO. 5
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP65 (PG 64-10) SURFACE COURSE
ALTERNATE PAVEMENT EDGE
SHOULDER BACKING
PER DETAIL
0.19' BELOW
PAVEMENT
EDGE
HMA AGGREGATE
(UNLESS INDICATED OTHERWISE)
REMOVE AND REPLACE AREAS 1/2-INCH TYPE A OR 3/4-INCH* TYPE A LEVELING COURSES 3/8-INCH TYPE A
BASE COURSES 1/2-INCH TYPE A OR 3/4-INCH* TYPE A
INTERMEDIATE COURSES 1/2-INCH TYPE A OR 3/4-INCH* TYPE A SURFACE COURSES 1/2-INCH TYPE A
0.25'
TAPER LEVELING COURSE OVER 5' TO 0' THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)
0.25'
5'
0.25'
*3/4-INCH TYPE A MAY BE USED IF THE LIFT THICKNESS IS GREATER THAN 0.20-FOOT (2.4 INCHES).
0.08'
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
NOTE:
1. SEE PLAN FOR PAVING LIMITS
2. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
R&R (SEE PLAN FOR
LOCATION & DEPTH)
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
PLACE CRACK SEAL & SLURRY
SEAL (TYPE II) IN ALL AREAS
11 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:14 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
DETAILS
PAVEMENT TRANSITION A
NTS
20'
EX. PAVEMENT
SURFACE
TYPICAL SECTION NO. 4 TYPICAL SECTION NO. 5
TAPER HMA SURFACE
COURSE FROM 0.25'
TO 0.19' OVER 20'
MAINTAIN HMA LEVELING
COURSE 0.10'
REMOVE EX. HMA;
TAPER FROM 0.25'
TO 0.29' OVER 20'
25'
EX. CROSS GUTTER
25'
EX. CROSS GUTTER
EX. PAVEMENT SURFACE
0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10)
0.42'
0.33'
0.25' HMA BASE COURSE
HMA-SP50 (PG 64-10)
PAVEMENT TRANSITION C
NTS
EX. PAVEMENT SURFACE
0.17' HMA SURFACE
COURSE
HMA-SP50 (PG 64-10)
0.17' HMA BASE COURSE
HMA-SP50 (PG 64-10)
TYPICAL SECTION NO. 8
TRANSVERSE PAVING LIMIT C
KEYCUT - TYPE B1
TYPICAL SECTION NO. 7
PAVEMENT TRANSITION D
NTS
REMOVE EX. HMA (DEPTH VARIES)
REMOVE EX. HMA (DEPTH VARIES)
PAVEMENT TRANSITION B2
NTS
20'
EX. PAVEMENT
20'
REMOVE EX. HMA
EX. CROSS GUTTER
15'
2"
TAPER HMA SURFACE
COURSE FROM 0.17'
TO 0.27' OVER 15'
EX. PAVEMENT SURFACE
TRANSVERSE PAVING LIMIT B
NTS
REMOVE EX. HMA
TYPICAL SECTION NO. 4 TYPICAL SECTION NO. 6
EX. OR NEW
PAVEMENT
15'
0.17'
TAPER HMA SURFACE
COURSE FROM 0.17'
TO 0.19' OVER 15'
EX. PAVEMENT SURFACE
TRANSVERSE PAVING LIMIT C
NTS
REMOVE EX. HMA
TYPICAL SECTION NO. 8
15'
KEYCUT - TYPE B1
(TRANSVERSE KEYCUT)
NTS
EX. PAVEMENT OR
CROSS GUTTER
0.17' BELOW ADJACENT
FACILITY TO REMAINEX. PAVEMENT SURFACE
REMOVE EX.
PAVEMENT
KEYCUT - TYPE A1
(LONGITUDINAL KEYCUT)
NTS
5'
EX. CURB
& GUTTER
0.17' BELOW
GUTTER LIP
REMOVE EX.
PAVEMENT
EX. PAVEMENT SURFACE
TYPICAL SECTION NO. 6 TYPICAL SECTION NO. 7
REMOVE EX. HMA;
TAPER FROM 0.17'
TO 0' OVER 20'
EX. PAVEMENT
SURFACE
SURFACE COURSE
TAPER SURFACE
COURSE FROM 0.27'
TO 0.17' OVER 20'
0.25'
HMA LEVELING
COURSE 0.10'
TAPER HMA SURFACE
COURSE FROM 0.19'
TO 0.25' OVER 20'
EX. PAVEMENT SURFACE
TRANSVERSE PAVING LIMIT A
NTS
PAVEMENT TRANSITION B1
NTS
20'TYPICAL SECTION NO. 6
REMOVE 0.17' EX. HMA
EX. PAVEMENT
SURFACESURFACE COURSE
TAPER SURFACE
COURSE FROM 0.27'
TO 0.17' OVER 20'
EX. PAVEMENT OR
PAVEMENT EDGE
5'
TYPICAL SECTION NO. 3
TAPER HMA SURFACE COURSE
FROM 0.08' TO 0' OVER 5'
EX. PAVEMENT SURFACE
TRANSVERSE PAVING LIMIT D
NTS
NTS
SHOULDER BACKING DETAIL
SEE SPECIFICATIONS
FOR SHOULDER
BACKING MATERIAL EXIST. SURFACE
NEW HMA
OVERLAY
PLACE SHOULDER BACKING
AFTER COMPLETION OF HMA
SURFACING
4.0'-0"
3.0'-0"
2.0'-0"
1.0'-0"
0.25'-0.33'
0.17'-0.25'
0.08'-0.17'
0'-0.08'
H Y
DIMENSION
SCHEDULE
H
Y
NTS
REMOVE & REPLACE HMA (VARIOUS DEPTHS)
W
(PAVEMENT
REMOVAL)
NOTES:
1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN .13' OF MATERIAL, SUBGRADE SHALL BE
RECOMPACTED TO 95% R.C.
2. ALL COURSES SHALL CONSIST OF HMA-SP85 (PG 64-10).
EX, PAVEMENT, GUTTER
LIP OR SPANDREL
TACK COAT ALL VERTICAL
EDGES PRIOR TO PAVING
SEE NOTE 1 Y (INTERMEDIATE COURSE)
0.25'
0.33'
0.42'
0.50'
0.58'
0.67'
0'
0.17'
0.25'
0.25'
0.33'
0.25'
0'
0'
0'
0'
0'
0.25'
0.25'
0.17'
0.17'
0.25'
0.25'
0.17'
X (BASE COURSE)
Z (SURFACE COURSE)
DEPTH MEASUREMENTS
XYZW
12 N KELLOGG AVE
CALLE REAL
SOMERSET DR
DR
HANNAPAREJO
DR
217
NORTH KELLOGG AVENUE
R&R 0.33' HMA
(~6'X120')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~12'X70')
R&R 0.33' HMA
(~15'X41')
R&R 0.33' HMA
(~18'X14') R&R 0.33' HMA
(~6'X9')
R&R 0.33' HMA
(~14'X18') R&R 0.33' HMA
(~6'X8')
R&R 0.33' HMA
(~8'X16')
R&R 0.33' HMA
(~8'X12')
R&R 0.33' HMA
(~12'X15')
10+00 11+00 12+00 13+00 14+00
15+00
PRB
PROTECT EX. BRIDGE IN PLACE
C10
C1
TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 2
TREATMENT LIMIT @
CHANGE OF PAVEMENT
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.
ALTERNATE PAVEMENT EDGE
SHOULDER BACKING
PER DETAIL
0.19' BELOW
PAVEMENT
EDGE
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
10+00 11+00 12+00 13+00 14+00
15+00
NORTH KELLOGG AVENUE
DETAIL 39DETAIL 12 WITH TYPE G MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERS DETAIL 39A WITH GREEN PAINT DETAIL 39
HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT (TYP.)
REPLACE EXISTING
STOP BAR
(2 FT. WIDE) (TYP.)
4' MIN.
11' MIN. 11' MIN.
11' MIN.
11' MIN.
4' MIN.
REPLACE EXISTING SIGNAL AHEAD WORDMARKINGS SPACED ±58' APART AND ± 285'FROM THE INTERSECTION (TYP.) 50'
50'
200'
CALLE REAL - PAVEMENT TREATMENT LIMITS
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 15+50 - SEE SHEET
6 CALLE REAL
NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 15+50 - SEE SHEET
6 BORING LOG
NO. HMA CTB FABRIC (Y/N)
C1 5-1/2" 4 N
C10 6" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CALLE REAL - STRIPING LAYOUT
BASE BID
STA 10+00 TO STA 15+50
13 MARAVILLA
R&R 0.33' HMA
(~12'X14') R&R 0.33' HMA
(~24'X88')
R&R 0.33' HMA
(~18'X37')
R&R 0.33' HMA
(~12'X20')
R&R 0.33' HMA
(~24'X67')
R&R 0.33' HMA
(~12'X36')
R&R 0.33' HMA
(~12'X90')
R&R 0.33' HMA
(~12'X81')
R&R 0.33' HMA
(~12'X60')
R&R 0.33' HMA
(~12'X60') R&R 0.33' HMA
(~12'X18')
R&R 0.33' HMA
(~6'X15')
2 16+00 17+00 18+00 19+00 20+00 21+00 22+
PROTECT EX.
BRIDGE IN PLACE
1 C2
C9
C8
TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 2
N KELLOGG AVE
CALLE REAL
SOMERSET DR
DR
HANNAPAREJO
DR
217
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.
ALTERNATE PAVEMENT EDGE
SHOULDER BACKING
PER DETAIL
0.19' BELOW
PAVEMENT
EDGE
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
16+00 17+00 18+00 19+00 20+00 21+00 22+
TYPE IV (L) ARROW
(TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUE MARKER
DETAIL 39DETAIL 12 WITH TYPE G MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39A WITH GREEN PAINT DETAIL 39
11' MIN. 11' MIN.
4' MIN.
11' MIN. 11' MIN.
4' MIN.
11'
200'
50'
138.5'
DETAIL 39A WITH GREEN PAINT AT BUS STOP
50'
MARAVILLA
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 15+50 - SEE SHEET 5
MATCHLINE STA 22+00 - SEE SHEET 7
CALLE REAL
NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 15+50 - SEE SHEET 5
MATCHLINE STA 22+00 - SEE SHEET 7
BORING LOG
NO. HMA CTB FABRIC (Y/N)
C2 6-1/4" - N
C8 6" - N
C9 5" -N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BASE BID
STA 15+50 TO STA 22+00
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
14 MARAVILLA
R&R 0.33' HMA
(~12'X40')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6') R&R 0.33' HMA
(~6'X25')
R&R 0.33' HMA
(~6'X39')
R&R 0.33' HMA
(~24'X275')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~12'X125')
54 +00 23+00 24+00 25+00 26+00 27+00 28+00
C3
C7
C4
TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 2
3 N KELLOGG AVE
CALLE REAL
SOMERSET DR
DR
HANNAPAREJO
DR
217
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.
ALTERNATE PAVEMENT EDGE
SHOULDER BACKING
PER DETAIL
0.19' BELOW
PAVEMENT
EDGE
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
+00 23+00 24+00 25+00 26+00 27+00 28+00
16°'
DETAIL 39DETAIL 12 WITH TYPE G MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39A WITH GREEN PAINT DETAIL 39
REPLACE EXISTINGLADDER STYLECROSSWALK
REPLACE EXISTINGSTOP BAR(2 FT. WIDE) (TYP.)
11' MIN. 11' MIN.11' MIN.11' MIN. 5' MIN.
5' MIN.
200'
50'
50'
MARAVILLA
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 28+50 - SEE SHEET 8
MATCHLINE STA 22+00 - SEE SHEET 6
CALLE REAL
NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 28+50 - SEE SHEET 8
MATCHLINE STA 22+00 - SEE SHEET 6
BORING LOG
NO. HMA CTB FABRIC (Y/N)
C3 10" - N
C4 10-1/2" - N
C7 5-1/2" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BASE BID
STA 22+00 TO STA 28+50
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
15 SANTA BARABRA COUNTY
FIRE STATION 12
R&R 0.33' HMA
(~12'X125') R&R 0.33' HMA
(~12'X50')
R&R 0.33' HMA
(~16'X128')
R&R 0.33' HMA
(~6'X6')
INSTALL SHOULDER BACKING R&R 0.33' HMA
(~12'X146')
R&R 0.33' HMA
(~27'X25') R&R 0.33' HMA
(~15'X16')
R&R 0.33' HMA
(~12'X88')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~10'X12')
R&R 0.33' HMA
(~24'X120')
7 6
29+00
30+00
31+00
32+00
33+00
C6
C5
TYPICAL SECTION NO. 1
CITY LIMITS
N KELLOGG AVE
CALLE REAL
SOMERSET DR
DR
HANNAPAREJO
DR
217
NTS
TYPICAL SECTION NO. 1
MEDIAN
WIDTH
(VARIES)
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP85 (PG 64-10) SURFACE COURSE.
ALTERNATE PAVEMENT EDGE
SHOULDER BACKING
PER DETAIL
0.19' BELOW
PAVEMENT
EDGE
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
29+00
30+00
31+00
32+00
33+00
SANTA BARABRA COUNTY
FIRE STATION 12
DETAIL 32
DETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39 DETAIL 12 WITH TYPE G MARKERSDETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 38A
20°'
TYPE IV (L) ARROW
(TYP.)
DETAIL 25 WITH TYPE D MARKERS
DETAIL 39A WITH GREEN PAINT
DETAIL 25 WITH TYPE D MARKERS
DETAIL 25 WITH TYPE D MARKERS
HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT (TYP.) 10'
11' MIN. 11' MIN.
11' MIN.11' MIN.
14'
5' MIN.
5' MIN.
100'
±35'
±35'
±97'
193'
CITY LIMITS
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (NORTH KELLOGG AVE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 28+50 - SEE SHEET
7 CALLE REAL
NORTH KELLOGG AVENUE TO CITY LIMITS
MATCHLINE STA 28+50 - SEE SHEET
7 BORING LOG
NO. HMA CTB FABRIC (Y/N)
C5 7" 3-1/2" N
C6 6" 4" N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BASE BID
STA 28+50 TO STA 33+65
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
16 N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
KINGS WAY
NORTH FAIRVIEW AVENUE
R&R 0.33' HMA
(~18'X40')
TYPICAL SECTION NO. 2
10+00
11+00
12+00
13+00
14+00
15+00
16+
TRANSVERSE PAVING LIMIT B C1
8 9
SEE SHEET 18 FOR WORK ON KINGS WAY
SEE SHEET 53 FOR CURB
RAMP ENLARGEMENT
SEE SHEET 53 FOR CURB
RAMP ENLARGEMENT
NTS
TYPICAL SECTION NO. 2
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.
TAPER FROM 0.17' TO 0.27' OVER 5'.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
KINGS WAY
10+00
11+00
12+00
13+00
14+00
15+00
16+
NORTH FAIRVIEW AVENUE
STOP SYMBOL
(TYP.)
SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTINENTAL STYLE CROSSWALK(TYP.)
DETAIL 27C PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.) DETAIL 27B PARKING LINE (TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUE
MARKER
100'
CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
1' WIDE STANDARD
STOP BAR (TYP.)10'
10' 10' 10'
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 16+00 - SEE SHEET 10 MATCHLINE STA 16+00 - SEE SHEET 10
KEY MAP
NTS
BERKELEY ROAD
NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 5-3/4" 12" 12 Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
BASE BID
STA 10+00 TO STA 16+00
STRIPING NOTES:
1. CROSSWALK, STOP BAR & STOP SYMBOL ON KINGS WAY
SHALL BE APPLIED WITH PAINT .
17 ALBANY COURT
R&R 0.33' HMA
(~8'X12')
TYPICAL SECTION NO. 2
R&R 0.33' HMA
(~10'X80')
+00
17+00
18+00
19+00
20+00
21+00
C2
11 10
13 12
DANBURY COURT
ALBANY COURT
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 2
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.
TAPER FROM 0.17' TO 0.27' OVER 5'.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
+00
17+00
18+00
19+00
20+00
21+00
DANBURY COURT
ALBANY COURT EXISTING FIRE HYDRANTREPLACE BLUEMARKER
STOP SYMBOL
(TYP.)
CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
1' WIDE STANDARD
STOP BAR (TYP.)
10' 10'
10'
10'
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)
SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 21+75 - SEE SHEET
11 MATCHLINE STA 16+00 - SEE SHEET 9
MATCHLINE STA 21+75 - SEE SHEET
11 MATCHLINE STA 16+00 - SEE SHEET 9
KEY MAP
NTS
BERKELEY ROAD
NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C2 5" 14" -Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BASE BID
STA 16+00 TO STA 21+75
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
STRIPING NOTES:
1. CROSSWALK, STOP BAR & STOP SYMBOL ON DANBURY
COURT & ALBANY COURT WAY SHALL BE APPLIED WITH
PAINT .
18 R&R 0.33' HMA
(~24'X968')
22+00
23+00
24+00
25+00
26+00
27+00
28+
TYPICAL SECTION NO. 2
C3
15 14
1716
WAKEFIELD ROAD ARUNDEL ROADSEE SHEETS 14 & 18 - 20 FOR WORK ON WAKEFIELD ROAD SEE SHEETS 15 & 21 - 23 FOR WORK ON ARUNDEL ROAD
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 2
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.
TAPER FROM 0.17' TO 0.27' OVER 5'.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
22+00
23+00
24+00
25+00
26+00
27+00
28+
WAKEFIELD ROAD ARUNDEL ROAD
EXISTING FIRE HYDRANT
REPLACE BLUEMARKER
STOP SYMBOL
(TYP.)
CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
1' WIDE STANDARD
STOP BAR (TYP.)
10'
10'
10'
10'
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)
SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 28+00 - SEE SHEET 12
MATCHLINE STA 21+75 - SEE SHEET
10 MATCHLINE STA 28+00 - SEE SHEET 12
MATCHLINE STA 21+75 - SEE SHEET
10 KEY MAP
NTS
BERKELEY ROAD
NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C3 5-1/2" 6" 10 Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BASE BID
STA 21+75 TO STA 28+00
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
STRIPING NOTES:
1. CROSSWALK, STOP BAR & STOP SYMBOL ON WAKEFIELD
ROAD & ARUNDEL ROAD SHALL BE APPLIED WITH PAINT .
19 R&R 0.33' HMA
(~24'X968')
R&R PCC C&G
(~43LF)
R&R 0.33' HMA
(~8'X50')
28+00
29+00
30+00
31+00
32+00
33+00
TRANSVERSE PAVING LIMIT B
TYPICAL SECTION NO. 2
18 19
22 20
21 20'
R&R 0.33' HMA
(~12'X36')
SYLVAN DRIVE
PAVEMENT TRANSITION B1
(SEE CONSTRUCTION NOTES)
C4 R&R 0.33' HMA
(~6'X43')
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 2
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.17' TO 0.27' HMA-SP50 (PG 64-10) SURFACE COURSE.
TAPER FROM 0.17' TO 0.27' OVER 5'.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
28+00
29+00
30+00
31+00
32+00
33+00
DETAIL 27B PARKING LINE (TYP.)
DETAIL 27B PARKING LINE (TYP.)
DETAIL 22
EXISTING FIRE HYDRANT
REPLACE BLUE
MARKER
STOP SYMBOL(TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.) 1' WIDE STANDARD STOP BAR (TYP.)
START DETAIL 22 ATSTATION 28+25
10'
10'
10'
10'
SHARED ROADWAY BICYCLE MARKING
(TYP.)
SYLVAN DRIVE
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 28+00 - SEE SHEET
11 KEY MAP
NTS
BERKELEY ROAD
NORTH FAIRVIEW AVENUE TO SYLVAN
DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C4 5" 6" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
MATCHLINE STA 28+00 - SEE SHEET
11 CONSTRUCTION NOTES:
1. IF BERKELEY ROAD (SYLVAN DRIVE TO EAST END) IS
INCLUDED IN PROJECT, USE "PAVEMENT TRANSITION B2" AT
PAVING LIMITS AS SEEN ON SHEET 41. OTHERWISE, USE
"PAVEMENT TRANSITION B1".
BASE BID
STA 28+00 TO STA 32+70
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
20 STOW CANYON ROAD
VIA FIORI
VIA FIORI
INSTALL HMA DIKE, TYPE A (TYP.)
REMOVE PCC RAMP
R&R 0.33' HMA
(~21'X55')
R&R 0.33' HMA
(~8'X12')
R&R 0.33' HMA
(~9'X12')
R&R 0.33' HMA
(~9'X28')
R&R 0.33' HMA
(~6'X6')
TYPICAL SECTION NO. 3
20+00
21+00
22+00
23+00
24+00
NORTH FAIRVIEW AVENUE
10+00
11+00
12+00
13+00
TRANSVERSE PAVING LIMIT D
VIA FIORI
TYPICAL SECTION NO. 3
25+00
26+00
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
R&R (SEE PLAN FOR
LOCATION & DEPTH)
ALTERNATE PAVEMENT EDGE
HMA DIKE,
TYPE A
0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)
0.25'
5'
3"
0.17'
MATCHLINE STA 24+75 - SEE ABOVE RIGHT
MATCHLINE STA 24+75 - SEE BELOW LEFT
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:15 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
BASE BID
STRIPING NOTES:
1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR
SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
21 STOW CANYON ROAD STOW CANYON ROAD
WAKEFIELD ROAD
WAKEFIELD ROAD
TRANSVERSE PAVING LIMIT D
R&R 0.33' HMA
(~12'X30')
R&R 0.33' HMA
(~8'X14')
R&R 0.33' HMA
(~8'X17')
R&R 0.33' HMA
(~6'X31')
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
R
R R
89+0090+0091+00
40+00
41+00
42+00
43+00
44+00
45+00
R&R PCC C&G
(~30LF)
R&R PCC C&G
(~14LF)
R&R PCC C&G
(~17LF)
TRANSVERSE PAVING LIMIT D
TRANSVERSE PAVING LIMIT D
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
R&R (SEE PLAN FOR
LOCATION & DEPTH)
ALTERNATE PAVEMENT EDGE
HMA DIKE,
TYPE A
0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)
0.25'
5'
3"
0.17'
MATCHLINE STA 45+75 - SEE SHEET
15 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 91+75 - SEE SHEET
20 MATCHLINE STA 88+50 - SEE SHEET
19 BASE BID
22 ARUNDEL ROAD
STOW CANYON ROAD
W CANYO
R&R 0.33' HMA
(~6'X73')
R&R 0.33' HMA
(~6'X15')
TYPICAL SECTION NO. 3
25-30'
25-30'
46+00
47+00
48+00
49+00
50+00
51+00
52+00
11+
109+00110+00111+00
R&R PCC C&G
(~10LF)
R&R 0.33' HMA
(~8'X10') R
TRANSVERSE PAVING LIMIT D
TRANSVERSE PAVING LIMIT D
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
R&R (SEE PLAN FOR
LOCATION & DEPTH)
ALTERNATE PAVEMENT EDGE
HMA DIKE,
TYPE A
0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)
0.25'
5'
3"
0.17'
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 52+25 - SEE SHEET
16 MATCHLINE STA 45+75 - SEE SHEET
14 MATCHLINE STA 108+75 - SEE SHEET
22 MATCHLINE STA 111+50 - SEE SHEET
23 BASE BID
STRIPING NOTES:
1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR
SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
23 STOW CANYON ROAD
STOW CANYON ROAD
DARA ROAD
TYPICAL SECTION NO. 3
52+00
53+00
54+00
55+00
56+00
57+00
10+00
11+00
20+00
21+00
22+00
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
R&R (SEE PLAN FOR
LOCATION & DEPTH)
ALTERNATE PAVEMENT EDGE
HMA DIKE,
TYPE A
0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)
0.25'
5'
3"
0.17'
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 57+75 - SEE SHEET
17 MATCHLINE STA 52+25 - SEE SHEET
15 MATCHLINE STA 22+25 - SEE SHEET
24 BASE BID
24 E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
STOW CANYON ROAD
STOW CANYON ROAD
CAMBRIDGE DRIVE
R&R 0.33' HMA
(~8'X12')
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
58+00
59+00
60+00
61+00
62+00
90+00
TRANSVERSE PAVING LIMIT D
TRANSVERSE PAVING LIMIT D
NTS
TYPICAL SECTION NO. 3
5'5'
3/8" HMA LEVELING COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
R&R (SEE PLAN FOR
LOCATION & DEPTH)
ALTERNATE PAVEMENT EDGE
HMA DIKE,
TYPE A
0.25'
TAPER LEVELING COURSE OVER 5' TO 0" THICKNESS, 0.25'
FROM GUTTER LIP OR FL @ HMA DIKE (TYP.)
0.25'
5'
3"
0.17'
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 57+25 - SEE SHEET
16 BASE BID
STRIPING NOTES:
1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR
SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
25 WAKEFIELD ROAD
BERKELEY ROAD
80+00
81+00
82+00
83+00
SEE SHEETS 9 - 12 FOR WORK ON
BERKELEY ROAD (NORTH FAIRVIEW
AVENUE TO SYLVAN DRIVE)
R&R PCC C&G
(~43LF)
R&R 0.33' HMA
(~8'X43')R
SEE SHEET 10 FOR STRIPING
ON WAKEFIELD ROAD AT
BERKELEY ROAD
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
KINGS WAY
BERKELEY ROAD
SEE SHEETS 9 - 12 FOR WORK ON
BERKELEY ROAD (NORTH FAIRVIEW
AVENUE TO SYLVAN DRIVE)
R&R 0.33' HMA
(~12'X17')
R&R 0.33' HMA
(~10'X40')
R&R 0.33' HMA
(~6'X30')
R
R
R
15+00
50+0051+0052+0053+00
R&R PCC C&G
(~30LF)
R&R PCC C&G
(~17LF)
R&R PCC C&G
(~40LF)
SEE SHEET 9 FOR
STRIPING ON KINGS WAY
AT BERKELEY ROAD
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 83+50 - SEE SHEET
19 BASE BID
26 WAKEFIELD ROAD
CONNOR LANE
MARSTONE LANE
R&R 0.33' HMA
(~6'X15')
R&R 0.33' HMA
(~6'X11')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X45')
84+00
85+00
86+00
87+00
88+00
30+00 31+00
20+00 21+00
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
MATCHLINE STA 83+50 - SEE SHEET
18 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 88+50 - SEE SHEET 14
BASE BID
27 WAKEFIELD ROAD
AZALEA WAY
R&R 0.33' HMA
(~6'X24')
R&R 0.33' HMA
(~6'X9')
R&R 0.33' HMA
(~13'X60')
92+00
93+00
94+00
10+00
11+00
12+00
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 91+75 - SEE SHEET
14 BASE BID
28 E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICI
O
LA GOLETA RD
ARUNDEL ROAD
BERKELEY ROAD
SEE SHEETS 9 - 12 FOR WORK ON
BERKELEY ROAD (NORTH FAIRVIEW
AVENUE TO SYLVAN DRIVE)
R&R 0.33' HMA
(~12'X21')
26+00
100+00
101+00
102+00
103+00
104+00
105+
SEE SHEET 11 FOR STRIPING
ON ARUNDEL ROAD AT
BERKELEY ROAD
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 105+00 - SEE SHEET 22
BASE BID
29 E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICI
O
LA GOLETA RD
ARUNDEL ROAD
LEEDS LANE
MALEY DRIVE
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X24') R&R 0.33' HMA
(~6'X15')
R&R 0.33' HMA
(~8'X8')
R&R 0.33' HMA
(~12'X12')
5+00
106+00
107+00
108+00
20+00 21+00 22+00
15+00 16+00 17+00
R&R 0.33' HMA
(~10'X21')
R&R PCC C&G
(~21LF)
MATCHLINE STA 105+00 - SEE SHEET 21
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 108+75 - SEE SHEET 15
BASE BID
30 E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
ARUNDEL ROAD
112+00
113+00
114+00
115+00
ARUNDEL ROAD
CATHEDRAL OAKS ROAD
R&R 0.33' HMA
(~6'X56')
R&R 0.33' HMA
(~8'X16')
R&R 0.33' HMA
(~14'X22')
116+00
117+00
118+00
119+00
MATCHLINE STA 115+50 - SEE ABOVE RIGHT
MATCHLINE STA 111+50 - SEE SHEET 15
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 115+50 - SEE BELOW LEFT
BASE BID
31 E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
DARA ROAD
ANDAMAR WAY
23+00
24+00
25+00
26+00
27+00
70+00 +00
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
TRANSVERSE PAVING LIMIT D
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:16 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTSMATCHLINE STA 27+75 - SEE SHEET 25
MATCHLINE STA 22+25 - SEE SHEET
16 BASE BID
MATCHLINE STA 71+00 - SEE SHEET 26
32 E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
ANDAMAR WAY
ANDAMAR WAY
DARA ROAD
CATHEDRAL OAKS ROAD
R&R 0.33' HMA
(~6'X6')
28+00
29+00
30+00
31+00
79+00
80+00
81+00
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
TYPICAL SECTION NO. 3
TRANSVERSE PAVING LIMIT D
TRANSVERSE PAVING LIMIT D
TRANSVERSE PAVING LIMIT D
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
MATCHLINE STA 27+75 - SEE SHEET 24
BASE BID
STRIPING NOTES:
1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR
SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS OR COVERED FROM PAVING.
MATCHLINE STA 78+50 - SEE SHEET
26 33
E
SOMERSET DR
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
CATHEDRAL OAKS RD
CAMINO
CAMPANA
LL WAY
STOW CANYON RD
LA
ANDAMAR WAY
AND
Y
71+00 72+00
73+00
74+00
75+00
76+00
77+00
78+00
TYPICAL SECTION NO. 3
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY-FAIRVIEW NEIGHBORHOOD (REHAB).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTHEAST GOLETA
NEIGHBORHOOD
KEY MAP
NTS NTS
BASE BID
MATCHLINE STA 71+00 - SEE SHEET
24 MATCHLINE STA 78+50 - SEE SHEET
24 34
HOLLISTER AVENUE
CATHEDRAL OAKS RD
PEBBLE BEACH DR
ELDERBERRY DRLAS ARMAS RD
VIA JERO
11+00
12+00
13+00
14+00
15+00
16+00
C4
CATHEDRAL OAKS ROAD
TREATMENT LIMIT @
CHANGE OF PAVEMENT
11+00
12+00
13+00
14+00
15+00
16+00
CATHEDRAL OAKS ROAD
DETAIL 22DETAIL 38DETAIL 39
DETAIL 27BDETAIL 39DETAIL 39DETAIL 22DETAIL 22DETAIL 39 DETAIL 39A WITH GREEN PAINT
DETAIL 39DETAIL 39
DETAIL 39
DETAIL 22DETAIL 38
TYPE IV (L) ARROW(TYP.)
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT(TYP.) STOP SYMBOL(TYP.)
TYPE IV (R) ARROW(TYP.)
DETAIL 39A WITH GREEN PAINT
HELMETED BICYCLIST SYMBOL
MUTCD FIGURE 9C-3WHITE PAINT (TYP.)
REPLACE BLUE MARKER
5'
11.5' 12.5'
±5.5'
±11'
10'
12'
11'
6'
11'±7.25'
EXISTING FIRE HYDRANT
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
HOLLISTER AVENUE
CATHEDRAL OAKS ROAD TO
PEBBLE BEACH DRIVE
BORING LOG
NO. HMA PCC FABRIC (Y/N)
C4 11-1/2" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
MATCHLINE STA 16+75 - SEE SHEET
28 BASE BID
STA 10+72 TO STA 16+75
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 16+75 - SEE SHEET
28 35
17+00
18+00
19+00
20+00 21+00
22+00 23+00
C3
WHIMBREL LANE
R&R 0.25' HMA
(~10'X50')
R&R 0.25' HMA
(~10'X557')
C2
WHIMBREL LANE
17+00
18+00
19+00
20+00 21+00
22+00 23+00
WHIMBREL LANE
WHIMBREL LANE
DETAIL 22DETAIL 39
DETAIL 39DETAIL 38 DETAIL 32 DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39DETAIL 24DETAIL 24
L 22 38
REPLACE BLUE MARKER
6.5'
11'11.25'11.25'
7'
5.75'
11'11'
6.5'
EXISTING FIRE HYDRANT
TYPE IV (L) ARROW
(TYP.)
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.)
HOLLISTER AVENUE
CATHEDRAL OAKS RD
PEBBLE BEACH DR
ELDERBERRY DRLAS ARMAS RD
VIA JERO
HOLLISTER AVENUE
CATHEDRAL OAKS ROAD TO
PEBBLE BEACH DRIVE
BASE BID
STA 16+75 TO STA 23+25
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 16+75 - SEE SHEET
27 MATCHLINE STA 23+25 - SEE SHEET 29
MATCHLINE STA 16+75 - SEE SHEET
27 MATCHLINE STA 23+25 - SEE SHEET 29
BORING LOG
NO. HMA PCC FABRIC (Y/N)
C2 9" - Y
C3 11-1/2" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
KEY MAP
NTS
36 24+00
25+00 26+00
27+00
28+00
29+00
C1
R&R 0.25' HMA
(~6'X107')
R&R 0.50' HMA
(~10'X63')
R&R 0.25' HMA
(~10'X557')
10'
16'
R&R 0.25' HMA
(~1,330SF)
R&R 0.25' HMA
(~6'X130')
R&(~
HOLLISTER AVENUE
CATHEDRAL OAKS RD
PEBBLE BEACH DR
ELDERBERRY DRLAS ARMAS RD
VIA JERO
24+00
25+00 26+00
27+00
28+00
29+00
DETAIL 39
DETAIL 39
DE
DETAIL 24DETAIL 24DETAIL 39
D
DETAIL 39DETAIL 39DETAIL 38
D
DETAIL 22
DE
6'
11'11'
±7.25'
11'
6'
11'11'
6.5'
HOLLISTER AVENUE
CATHEDRAL OAKS ROAD TO
ELDERBERRY DRIVE
BASE BID
STA 23+25 TO STA 29+00
MATCHLINE STA 23+25 - SEE SHEET 28
MATCHLINE STA 29+00 - SEE SHEET
30 BORING LOG
NO. HMA PCC FABRIC (Y/N)
C1 9" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 29+00 - SEE SHEET
30 MATCHLINE STA 23+25 - SEE SHEET 28
37 29+00
30+00
31+00
32+00
33+00
34+00
35+00
LAS ARMAS ROAD
C5
ELDERBERRY DRIVE
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.67')
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.33')TREATMENT LIMITS @
CHANGE OF PAVEMENT
R&R 0.25' HMA
(~6'X130')
R&R 0.25' HMA
(~6'X40')
R&R 0.25' HMA
(~6'X193')
R&R 0.25' HMA
(~10'X15')
26'
16'
17'
HOLLISTER AVENUE
CATHEDRAL OAKS RD
PEBBLE BEACH DR
ELDERBERRY DRLAS ARMAS RD
VIA JERO
NTS
TYPICAL SECTION NO. 4
0.67'
EB LANE
(VARIES)
WB LANE
(VARIES)
ALTERNATE PAVEMENT EDGE 1
R&R (SEE PLAN FOR
LOCATION & DEPTH)
0.33'
HMA LIFT THICKNESSES:
1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).
2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).
3. 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).
APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
LAS ARMAS ROAD
L 39
DETAIL 39
DETAIL 39DETAIL 39
38 DETAIL 38
22 DETAIL 22
DETAIL 39A WITH GREEN PAINT
DETAIL 29
DETAIL 39A WITH GREEN PAINTDETAIL 39A WITH GREEN PAINT
REPLACE BLUE MARKER
REPLACE BLUE MARKER
11.5'
11.5'
EXISTING FIRE HYDRANT
EXISTING FIRE HYDRANT
DETAIL 22
DETAIL 39A WITH GREEN PAINTDETAIL 39A WITH GREEN PAINT
DETAIL 39DETAIL 39
DETAIL 38 DETAIL 39DETAIL 39
TYPE IV (L) ARROW(TYP.)
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.) 12' 12' 11.5'
EXISTING FIRE HYDRANT
REPLACE BLUE MARKER
±10'
6.5'
6'
ELDERBERRY DRIVE
6'
6.5'
DETAIL 39A WITH GREEN PAINTDETAIL 39A WITH GREEN PAINT
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 35+50 - SEE SHEET 31
MATCHLINE STA 29+00 - SEE SHEET
29 HOLLISTER AVENUE
CATHEDRAL OAKS ROAD TO
PEBBLE BEACH DRIVE
BORING LOG
NO. HMA PCC FABRIC (Y/N)
C5 11-1/2" 8" Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
BASE BID
STA 29+00 TO STA 35+50
STRIPING NOTES:
1. STRIPING AS SHOWN REPRESENTS EXISTING. CONTRACTOR
SHALL REPLACE IN KIND WITH PAINT ANY STRIPING
REMOVED FROM DIGOUTS.
MATCHLINE STA 35+50 - SEE SHEET 31
MATCHLINE STA 29+00 - SEE SHEET
29 38
VIA JERO
36+00
37+00
38+00
39+00
40+00
41+00
42+
ELLWOOD SCHOOL
C7
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.67')
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.33')
TYPICAL SECTION
NO. 4 (COLD PLANE &
REPLACE 0.33')
27 23
2928
26 24
25 17'
17'
15'
R&R 0.67' HMA
(~11'X33')
HOLLISTER AVENUE
CATHEDRAL OAKS RD
PEBBLE BEACH DR
ELDERBERRY DRLAS ARMAS RD
VIA JERO
NTS
TYPICAL SECTION NO. 4
0.67'
EB LANE
(VARIES)
WB LANE
(VARIES)
ALTERNATE PAVEMENT EDGE 1
R&R (SEE PLAN FOR
LOCATION & DEPTH)
0.33'
HMA LIFT THICKNESSES:
1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).
2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).
3. 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).
APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
VIA JERO
ELLWOOD SCHOOL
DETAIL 32
DETAIL 22
DETAIL 39A WITH GREEN PAINTDETAIL 39
DETAIL 38
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 22
DETAIL 39
DETAIL 38
DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39
DETAIL 39
DETAIL 39
TYPE IV (L) ARROW
(TYP.)
HELMETED BICYCLIST SYMBOL
MUTCD FIGURE 9C-3
WHITE AND GREEN PAINT (TYP.)
12'
12'
11.5'
6'
6'
11'
EXISTING FIRE HYDRANT
EXISTING FIRE HYDRANT
CONTINENTAL STYLE
CROSSWALK 2' WIDE
BARS BY 10' LONG
2' WIDE STANDARDSTOP BAR (TYP.)
CONTINENTAL STYLE
CROSSWALK 2' WIDE
BARS BY 12' LONG
CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG
REPLACE BLUE MARKER
REPLACE BLUE MARKER
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 35+50 - SEE SHEET 30
MATCHLINE STA 42+00 - SEE SHEET 32
HOLLISTER AVENUE
CATHEDRAL OAKS ROAD TO
PEBBLE BEACH DRIVE
BORING LOG
NO. HMA PCC FABRIC (Y/N)
C7 11-1/2" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
BASE BID
STA 35+50 TO STA 42+00
MATCHLINE STA 35+50 - SEE SHEET 30
MATCHLINE STA 42+00 - SEE SHEET 32
39 +00
43+00
44+00
45+00
46+00
47+00
PEBBLE BEACH DRIVE
C6
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.67')
TYPICAL SECTION NO. 4
(COLD PLANE & REPLACE 0.33' )
15'
HOLLISTER AVENUE
CATHEDRAL OAKS RD
PEBBLE BEACH DR
ELDERBERRY DRLAS ARMAS RD
VIA JERO
NTS
TYPICAL SECTION NO. 4
0.67'
EB LANE
(VARIES)
WB LANE
(VARIES)
ALTERNATE PAVEMENT EDGE 1
R&R (SEE PLAN FOR
LOCATION & DEPTH)
0.33'
HMA LIFT THICKNESSES:
1. 0.33' HMA-SP85 (PG 64-10) BASE COURSE (EB LANE ONLY).
2. 0.17' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE (EB AND WB LANES).
3. 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE (EB AND WB LANES).
APPLY FOG SEAL
TO EX. HMA DIKE
EX. HMA WALKWAY
(WHERE APPLICABLE)
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
PEBBLE BEACH DRIVE
DETAIL 22
DETAIL 38
DETAIL 39
DETAIL 38DETAIL 22
DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
TYPE IV (L) ARROW
(TYP.)
HELMETED BICYCLIST SYMBOL
MUTCD FIGURE 9C-3
WHITE AND GREEN PAINT (TYP.)
11'
11'
11'
6' MIN.
5' MIN.
±21.5'
DETAIL 27B WITH DIAGONAL CROSSHATCH MARKINGS 20' O.C.
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CATHEDRAL OAKS ROAD TO PEBBLE BEACH ROAD).DWG Plot Date: 1/23/2025 3:17 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 42+00 - SEE SHEET 31
HOLLISTER AVENUE
CATHEDRAL OAKS ROAD TO
PEBBLE BEACH DRIVE
BORING LOG
NO. HMA PCC FABRIC (Y/N)
C6 8" - Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING
SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN
SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
BASE BID
STA 42+00 TO STA 46+80
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
MATCHLINE STA 42+00 - SEE SHEET 31
40 GLEN ANNIE ROAD
97+00
98+00 99+00 100+00 101+00 102+00
103+00
CAMINO REAL MARKETPLACE
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6)'
R&R 0.33' HMA
(~6'X8')
R&R PCC
CURB (~14LF)
HOLLISTER AVENUE
SANTA FELICIA DR
CAMINO REAL
GLEN ANNIE RD
STORKE ROAD
MARKETPLACE
97+00
98+00 99+00 100+00 101+00 102+00
103+00
GLEN ANNIE ROAD
CAMINO REAL MARKETPLACE
DETAIL 40
DETAIL 40
DETAIL 40
DETAIL 39A WITH GREEN PAINT (60')DETAIL 39A WITH GREEN PAINT (60') DETAIL 39A WITH GREEN PAINT (65')
DETAIL 39A WITH GREEN PAINT (65')
DETAIL 39DETAIL 38DETAIL 38DETAIL 38DETAIL 38DETAIL 39DETAIL 38 DETAIL 25 DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90')DETAIL 9 WITH TYPE G MARKERS DETAIL 9 WITH TYPE G MARKERS
DETAIL 39DETAIL 38
DETAIL 25 WITH YELLOW DIAGONAL CROSSHATCHING MARKINGS 20' O.C.
DETAIL 38DETAIL 39
DETAIL 36 WITH CHEVRON PAVEMENT MARKINGS 40' O.C.
DETAIL29
DETAIL29
DETAIL 40DETAIL 40
DETAIL 39A WITH GREEN PAINT (60')
CONTINENTAL STYLECROSSWALK 2' WIDEBARS BY 12' LONG (TYP.) HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.) TYPE IV (L) ARROW(TYP.)
TYPE IV (R) ARROW
(TYP.)
1' WIDE
STANDARD
STOP BAR (TYP.)
11'11'
11' MIN.
11'11'
5' MIN.
7'
11' MIN.
5' MIN.
12'
50' 50'
50' 50'
REPLACE BLUE MARKER
EXISTING FIRE HYDRANT
EXISTING FIRE HYDRANT
11'11'
MATCHLINE STA 103+25 - SEE SHEET 34
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CAMINO REAL MARKETPLACE TO STORKE ROAD).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTSNTS
HOLLISTER AVENUE
CAMINO REAL MARKETPLACE TO
STORKE ROAD
BASE BID
STA 96+97 TO STA 103+25
MATCHLINE STA 103+25 - SEE SHEET 34
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
41 HOLLISTER AVENUE
SANTA FELICIA DR
CAMINO REAL
GLEN ANNIE RD
STORKE ROAD
MARKETPLACE
104+00 105+00
106+00
107+00
108+00
STORKE ROAD
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X51')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X9')
R&R 0.33' HMA
(~6'X62')
R&R 0.33' HMA
(~6'X6')
104+00 105+00
106+00
107+00
108+00
STORKE ROADSTORKE ROAD
DETAIL 39A WITH GREEN PAINT
(200')
DETAIL 38DETAIL 39DETAIL 25DETAIL 38
DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90')
DETAIL 39A WITH GREEN PAINT (90') DETAIL 38DETAIL 38DETAIL 38DETAIL 38 DETAIL 39DETAIL 38DETAIL 38 DETAIL 9 WITH TYPE G MARKERSDETAIL 9 WITH TYPE G MARKERSDETAIL 39 HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT (TYP.) TYPE IV (L) ARROW(TYP.)
TYPE IV (R) ARROW(TYP.)
1' WIDE STANDARD STOP BAR (TYP.)
±12.5'11' MIN.
10' MIN.
11' MIN.±10.5'11'11'
7' 5' MIN.
NEW LADDER STYLECROSSWALK
5' MIN.
50' 50'
50'
50'
REPLACE EXISTING
YIELD WORD MARKINGS
CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
REPLACE BLUE MARKER
EXISTING FIRE HYDRANT
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_HOLLISTER AVENUE (CAMINO REAL MARKETPLACE TO STORKE ROAD).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTSNTS
STORKE ROAD
CAMINO REAL MARKETPLACE TO
STORKE ROAD
MATCHLINE STA 103+25 - SEE SHEET 33
BASE BID
STA 103+25 TO STA 108+61
SEE SHEETS 37 - 38 FOR
WORK ON STORKE ROAD
MATCHLINE STA 103+25 - SEE SHEET 33
HOLLISTER AVENUE - PAVEMENT TREATMENT LIMITS
HOLLISTER AVENUE - STRIPING LAYOUT
42 14+00
MANDARIN DRIVE
R&R 0.33' HMA
(~9'X20')
R&R 0.33' HMA
(~8'X30')
END COLD PLANE & REPLACE @ CHANGE OF PAVEMENT
END COLD PLANE & REPLACE
@ CHANGE OF PAVEMENT
~18'
~35'
11'
11'
~129'
~193'
C1
TYPICAL SECTION NO. 5
TYPICAL SECTION NO. 5
REMOVE, SALVAGE &
REPLACE ROADSIDE SIGN
SOUTH FAIRVIEW AVENUE
50+00
51+00
52+00
53+00
MANDARIN DR
ORANGE AVE
MAGNOLIA AVE
HOLLISTER AVE
CALLE REAL
VEGA DR
NTS
TYPICAL SECTION NO. 5
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP65 (PG 64-10) SURFACE COURSE
NOTE:
1. SEE PLAN FOR PAVING LIMITS
2. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
14+00
14+00
50+00
51+00
52+00
53+00
MANDARIN DRIVE
REPLACE BLUE MARKER
REPLACE 15' RED CURB
ON EACH SIDE OF FIRE HYDRANT
REPLACE 60' RED CURB
REPLACE 30' RED CURB
REPLACE
R1-1
EXISTING FIRE HYDRANT
DETAIL 39DETAIL 39
DETAIL 39
DETAIL 39A
DETAIL 39A
DETAIL 39A
DETAIL 39A
2' WIDE STANDARD STOP BAR (TYP.)
STOP SYMBOL (TYP.)
DETAIL 39A
CHEVRON PAVEMENTMARKING AT EXIT GORE AREACHEVRONS SPACED 12' O.C. ±37'
±34'
±59'
±64'
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3 WHITE
TYPE IV (L) ARROW(TYP.)
5' MIN.
SOUTH FAIRVIEW AVENUESOUTH FAIRVIEW AVENUE
50+00
51+00
52+00
53+00
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_SOUTH FAIRVIEW AVENUE (SOUTH FAIRVIEW AVENUE TO NORTH END).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 53+75 - SEE SHEET 36
SOUTH FAIRVIEW AVENUE
SOUTH FAIRVIEW AVENUE TO NORTH END
KEY MAP
NTS
BORING LOG
NO. HMA FABRIC (Y/N)
C1 6-1/2" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY
FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT
IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).
BASE BID
STA 50+26 TO STA 53+75
SOUTH FAIRVIEW AVENUE - PAVEMENT TREATMENT LIMITS
SOUTH FAIRVIEW AVENUE - STRIPING LAYOUT
MATCHLINE STA 53+75 - SEE SHEET 36
43 END COLD PLANE & REPLACE
@ CHANGE OF PAVEMENT
~193'
~18'
C2
TYPICAL SECTION NO. 5
54+00
55+00
56+00
MANDARIN DR
ORANGE AVE
MAGNOLIA AVE
HOLLISTER AVE
CALLE REAL
VEGA DR
NTS
TYPICAL SECTION NO. 5
0.19'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.19' HMA-SP65 (PG 64-10) SURFACE COURSE
NOTE:
1. SEE PLAN FOR PAVING LIMITS
2. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
54+00
55+00
56+00
REPLACE BLUE MARKER
REPLACE 15' OF RED CURB ONEACH SIDE OF FIRE HYDRANT
REPLACE 30' RED CURB
REPLACE 12' RED CURB
EXISTING FIRE HYDRANT
54+00
55+00
56+00
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_SOUTH FAIRVIEW AVENUE (SOUTH FAIRVIEW AVENUE TO NORTH END).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 53+75 - SEE SHEET 35
SOUTH FAIRVIEW AVENUE
SOUTH FAIRVIEW AVENUE TO NORTH END
KEY MAP
NTS
VIEW AVENUE
BORING LOG
NO. HMA FABRIC (Y/N)
C2 5" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY
FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT
IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).
MATCHLINE STA 53+75 - SEE SHEET 35
SOUTH FAIRVIEW AVENUE - PAVEMENT TREATMENT LIMITS
SOUTH FAIRVIEW AVENUE - STRIPING LAYOUT
BASE BID
STA 53+75 TO STA 56+66
44 BOLLAY DR
SANTA FELICIA DR
HOLLISTER AVE
CORTONA DR
GLEN ANNIE RD
CALLE REAL
© 2023 Microsoft Corporation © 2023 Ma
STORKE PLAZA
R&R 0.50' HMA
(~12'X43')
C3
R&R 0.50' HMA
(~18'X270')
SEE SHEET 55 FOR CURB
RAMP ENLARGEMENT
BOLLAY DRIVE
C6
SEE SHEET 57 FOR CURB
RAMP ENLARGEMENT
SEE SHEET 57 FOR CURB
RAMP ENLARGEMENT SEE SHEET 56 FOR CURB
RAMP ENLARGEMENT
SEE SHEET 56 FOR CURB
RAMP ENLARGEMENT
SEE SHEET 55 FOR CURB
RAMP ENLARGEMENT
PROPOSED MODIFIED MEDIAN
(SEE CONSTRUCTION &
STRIPING NOTE 1)
BUS PAD EXTENDED (SEE
CONSTRUCTION & STRIPING NOTE 1)
48+00
49+00
50+00
51+00
52+
MARKETPLACE
DRIVE
R&R 0.50' HMA
(~6'X205')
R&R 0.50' HMA
(~6'X22')
R&R 0.50' HMA
(~6'X40')R&R 0.50' HMA
(~14'X39')
© 2023 Microsoft Corporation © 2023 Ma
48+00
49+00
50+00
51+00
52+
STORKE PLAZABOLLAY DRIVE
MARKETPLACE
DRIVE
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 40
DETAIL 40
DETAIL 41 YELLOW PAINT
DETAIL 40
DETAIL 39A WITH GREEN PAINT
DETAIL 9 WITH TYPE G MARKERS
DETAIL 38
DETAIL 22
DETAIL 38
DETAIL 9 WITH TYPE G MARKERS
DETAIL 22
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 40
DETAIL 40
DETAIL 40
DETAIL 40
HELMETED BICYCLIST SYMBOL MUTCD
FIGURE 9C-3 WHITE AND GREEN PAINT
(TYP.)
NEW LADDER STYLE CROSSWALK (TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUE MARKER
10'
11'
11'
11'
11'
11.5'
5'
11'
11'
11'±6'
12'
12'
11.25'
±6'±9.25' ±7.5'
50'
50'
±7' 50'
50'
6'
11'
50'
50'DETAIL 9
DETAIL 25
DETAIL 38
DETAIL 38
DETAIL 38
DETAIL 38
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_STORKE ROAD (HOLLISTER AVENUE TO BOLLAY DRIVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 52+00 - SEE SHEET 38
STORKE ROAD
HOLLISTER AVENUE TO BOLLAY DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C3 12" -- Y
C6 11" -- Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CONSTRUCTION & STRIPING NOTES:
1. SEE STORKE ROAD / HOLLISTER AVE. TRANSIT, BIKE / PED, AND
MEDIAN IMPROVEMENTS PLANS FOR WORK ON BUS PAD
EXTENSION, RIGHT TURN EXTENSION, BUS STOP REMOVAL, CURB & GUTTER, AND MODIFIED MEDIAN.
2. PERFORM DIGOUTS IN CONJUNCTION WITH STORKE ROAD /
HOLLISTER AVE. TRANSIT, BIKE / PED, AND MEDIAN IMPROVEMENTS.
CONTRACTOR SHALL PHASE & COORDINATE ALL WORK
APPROPRIATELY TO COMPLETE WORK AS SHOWN PER PLANS.
BID ALTERNATE 1
STA 48+33 TO STA 52+00
STORKE ROAD - PAVEMENT TREATMENT LIMITS
STORKE ROAD - STRIPING LAYOUT
MATCHLINE STA 52+00 - SEE SHEET 38
45 BOLLAY DR
SANTA FELICIA DR
HOLLISTER AVE
CORTONA DR
GLEN ANNIE RD
CALLE REAL
© 2023 Microsoft Corporat
R&R 0.50' HMA
(~6'X79')
R&R 0.50' HMA
(~22'X180')
R&R 0.50' HMA
(~6'X255') R&R 0.50' HMA
(~10'X82')
R&R 0.50' HMA
(~6'X24')
C1
C2
C4
C5
HOLLISTER AVENUE
SEE SHEET 54 FOR CURB RAMP &
PEDESTRIAN ISLAND ENLARGEMENT
SEE SHEET 54 FOR CURB
RAMP ENLARGEMENT
EX. MEDIAN
PROPOSED MODIFIED MEDIAN
(SEE CONSTRUCTION &
STRIPING NOTE 1)
RIGHT-TURN EXTENDED
(SEE CONSTRUCTION &
STRIPING NOTE 1)
PROPOSED CURB & GUTTER (SEE
CONSTRUCTION & STRIPING NOTE 1)
BUS STOP REMOVED
(SEE CONSTRUCTION
& STRIPING NOTE 1)
PROPOSED CURB & GUTTER
(SEE CONSTRUCTION &
STRIPING NOTE 1)
+00
53+00
54+00
55+00
56+00
R&R 0.50' HMA
(~8'X42')
R&R 0.50' HMA
(~18'X34')
R&R 0.50' HMA
(~6'X23')
R&R 0.50' HMA
(~6'X82')
R&R 0.50' HMA
(~6'X10')
R&R 0.50' HMA
(~20'X20')
R&R 0.50' HMA
(~6'X82')
REMOVE EX. TRAFFIC LOOP
REMOVE EX. WIRELESS TRAFFIC SENSOR
REMOVE EX. WIRELESS
TRAFFIC SENSOR
© 2023 Microsoft Corporat
+00
53+00
54+00
55+00
56+00
HOLLISTER AVENUE
DETAIL 9 WITH TYPE G MARKERS
DETAIL 38
DETAIL 9 WITH TYPE G MARKERS
DETAIL 39
DETAIL 39
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 39A WITH GREEN PAINT
DETAIL 38
DETAIL 38
DETAIL 38
TYPE IV (L) ARROW
(TYP.)
TYPE IV (R) ARROW
(TYP.)
CONTINENTAL STYLE CROSSWALK
2' WIDE BARS BY 12' LONG (TYP.)
HELMETED BICYCLIST SYMBOL MUTCD
FIGURE 9C-3 WHITE AND GREEN PAINT
(TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUE MARKER
±11.5'
11'
DETAIL
22 11'
11'
11'
±6'
11'
11' MIN.
50'
50'
DETAIL 39
DETAIL 38A
DETAIL 38
2' WIDE CROSSWALK BAR
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_STORKE ROAD (HOLLISTER AVENUE TO BOLLAY DRIVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
STORKE ROAD
HOLLISTER AVENUE TO BOLLAY DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 9" 12" -Y
C2 10-1/2" 2" 71 Y
C4 7-1/4" 13" -Y
C5 12" -- Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
MATCHLINE STA 52+00 - SEE SHEET 37
BID ALTERNATE 1
STA 52+00 TO STA 56+08
CONSTRUCTION & STRIPING NOTES:
1. SEE STORKE ROAD / HOLLISTER AVE. TRANSIT, BIKE / PED, AND
MEDIAN IMPROVEMENTS PLANS FOR WORK ON BUS PAD
EXTENSION, RIGHT TURN EXTENSION, BUS STOP REMOVAL, CURB & GUTTER, AND MODIFIED MEDIAN.
2. PERFORM DIGOUTS IN CONJUNCTION WITH STORKE ROAD /
HOLLISTER AVE. TRANSIT, BIKE / PED, AND MEDIAN IMPROVEMENTS.
CONTRACTOR SHALL PHASE & COORDINATE ALL WORK
APPROPRIATELY TO COMPLETE WORK AS SHOWN PER PLANS.
STORKE ROAD - PAVEMENT TREATMENT LIMITS
STORKE ROAD - STRIPING LAYOUT
SEE SHEET 33 FOR WORK
ON HOLLISTER AVENUE
MATCHLINE STA 52+00 - SEE SHEET 37
46 DEL NORTE DR MENDOCINO DR
SAN MATEO AVE
GLEN ANNIE RD
MADERA DR
COLUSADR
CALAVERAS AVE
C2
50+00
51+00
52+00
53+00
54+00
55+00
CALAVERAS AVENUE
PLUMAS AVENUE
INSTALL SHOULDER BACKING
PROTECT EX. OVERSIDE DRAIN IN PLACE
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X12')
R&R 0.33' HMA
(~6'X75')
R&R 0.33' HMA
(~12'X42')
R&R 0.33' HMA
(~6'X15')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X6')
TYPICAL SECTION NO. 6
30 31
32 33
TREATMENT LIMIT @
CHANGE OF PAVEMENT
C2
NTS
TYPICAL SECTION NO. 6
0.29'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
SHOULDER BACKING
PER DETAIL
HMA LIFT THICKNESSES:
1. 0.08' HMA-SP50 (PG 64-10) LEVELING COURSE.
2. 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
50+00
51+00
52+00
53+00
54+00
55+00
CALAVERAS AVENUE
PLUMAS AVENUE
DETAIL 22DETAIL 39DETAIL 39A WITH GREEN PAINT
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
NEWR26 (CA)R81 (CA)
10'10'
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE PAINT (TYP.)
REPLACE BLUEMARKER
EXISTING FIRE HYDRANT
7' 7'
HELMETED BICYCLIST SYMBOLMUTCD FIGURE 9C-3WHITE AND GREEN PAINT (TYP.) CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (SONOMA AVE TO CALAVERAS AVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 55+50 - SEE SHEET
40 CALLE REAL
CALAVERAS AVENUE TO SONOMA AVENUE
MATCHLINE STA 55+50 - SEE SHEET
40 BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C2 8" 8" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 2
STA 50+00 TO STA 55+50
47 56+00
57+00
58+00
59+00
60+00
61+00
62+00
SAN MATEO AVENUE
MENDOCINO AVENUE
SONOMA AVENUE
PROTECT EX. OVERSIDE DRAIN IN PLACE
INSTALL SHOULDER BACKING
R&R 0.33' HMA
(~6'X138')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X10')
R&R 0.33' HMA
(~6'X154')
R&R 0.33' HMA
(~6'X20')
TYPICAL SECTION NO. 6
34 36 3735
C1
TREATMENT LIMIT @
CHANGE OF PAVEMENT
DEL NORTE DR MENDOCINO DR
SAN MATEO AVE
GLEN ANNIE RD
MADERA DR
COLUSADR
CALAVERAS AVE
NTS
TYPICAL SECTION NO. 6
0.29'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
SHOULDER BACKING
PER DETAIL
HMA LIFT THICKNESSES:
1. 0.08' HMA-SP50 (PG 64-10) LEVELING COURSE.
2. 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
56+00
57+00
58+00
59+00
60+00
61+00
62+00
SAN MATEO AVENUE
MENDOCINO AVENUE
SONOMA AVENUE
DETAIL 22DETAIL 39DETAIL 39A WITH GREEN PAINT
EXISTING
R26 (CA)
NEW
R81 (CA)
EXISTING
R26 (CA)
R81 (CA) EXISTING
R26 (CA)
R81 (CA)
NEW
R26 (CA)
R81 (CA)
NEWR26 (CA)R81 (CA)
NEW
R26 (CA)
R81 (CA)
NEWR26 (CA)R81 (CA)
10'
10'
REPLACE BLUE
MARKER
EXISTING FIRE HYDRANT
7'7'
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (SONOMA AVE TO CALAVERAS AVE).DWG Plot Date: 1/23/2025 3:18 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 55+50 - SEE SHEET
39 KEY MAP
NTS
CALLE REAL
CALAVERAS AVENUE TO SONOMA AVENUE
MATCHLINE STA 55+50 - SEE SHEET
39 BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 6" 6" 10 N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 2
STA 55+50 TO STA 61+47
48 32+00
33+00
34+00
35+00
36+00 37+00 38+00
PAVEMENT TRANSITION B2
R&R 0.33' HMA
(~8'X40')
R&R 0.33' HMA
(~6'X6')
R&R PCC C&G
(~20LF) R&R PCC C&G
(~50LF)
R&R 0.33' HMA
(~6'X25')
R&R PCC C&G
(~20LF) R&R 0.33' HMA
(~6'X45')
KEYCUT A1 (TYP.)
KEYCUT B1 (TYP.)
R&R 0.33' HMA
(~8'X80')
R&R 0.33' HMA
(~8'X20')
R&R 0.33' HMA
(~20'X35')
TYPICAL SECTION NO. 7 R&R 0.33' HMA
(~6'X120')
R&R 0.33' HMA
(~6'X20')
R&R 0.33' HMA
(~8'X131')
R&R 0.33' HMA
(~6'X15')
R&R PCC C&G
(~15LF)
C5
C6
39 38
R&R PCC C&G
(~40LF)
R&R PCC C&G
(~20LF)
R&R 0.33' HMA
(~6'X70')
SYLVAN DRIVE
R&R PCC C&G
(~20LF)
LEXINGTON AVENUE
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
NOTE:
1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,
PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
R&R (SEE PLAN FOR
LOCATION & DEPTH)
32+00
33+00
34+00
35+00
36+00 37+00 38+00
LEXINGTON AVENUE
DETAIL 27B PARKING LINE (TYP.)DETAIL 22 DETAIL 27B PARKING LINE (TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUE
MARKER
REPLACE BLUEMARKER
STOP SYMBOL(TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.)1' WIDE STANDARDSTOP BAR (TYP.)
SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 38+75 - SEE SHEET 42
KEY MAP
NTS
BERKELEY ROAD
SYLVAN DRIVE TO EAST END
BORING LOG
NO. HMA FABRIC (Y/N)
C5 3-1/2" N
C6 4" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY
FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT
IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 38+75 - SEE SHEET 42
SEE SHEETS 9 - 12 FOR WORK ON
BERKELEY ROAD (NORTH FAIRVIEWAVENUE TO SYLVAN DRIVE)
BID ALTERNATE 3
STA 32+50 TO STA 38+75
49 39+00 40+00 41+00 42+00 43+00 44+00
R&R 0.33' HMA
(~6'X170')
R&R 0.33' HMA
(~6'X20')
R&R 0.33' HMA
(~8'X45')
R&R 0.33' HMA
(~6'X170')
R&R 0.33' HMA
(~18'X33')
R&R 0.33' HMA
(~14'X35')
R&R 0.33' HMA
(~8'X13')
R&R 0.33' HMA
(~6'X6')
R&R 0.33' HMA
(~6'X10')
R&R 0.33' HMA
(~10'X108')
R&R 0.33' HMA
(~6'X170')
R&R 0.33' HMA
(~6'X15')KEYCUT A1 (TYP.)
C7
4240
43 41
25'
PAVEMENT TRANSITION C
R&R PCC C&G
(~31LF)
KEYCUT B1 (TYP.)
R&R PCC C&G
(~8LF)
R&R 0.33' HMA
(~8'X24')
R&R PCC C&G
(~15LF)
CAMBRIDGE DRIVE
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
NOTE:
1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,
PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
R&R (SEE PLAN FOR
LOCATION & DEPTH)
39+00 40+00 41+00 42+00 43+00 44+00
CAMBRIDGE DRIVE
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUE
MARKER
STOP SYMBOL(TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.)1' WIDE STANDARDSTOP BAR (TYP.) 10'
10'
10' 10'
SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 44+25 - SEE SHEET 43
MATCHLINE STA 38+75 - SEE SHEET 41
KEY MAP
NTS
BERKELEY ROAD
SYLVAN DRIVE TO EAST END
BORING LOG
NO. HMA FABRIC (Y/N)
C7 3-1/2" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY
FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT
IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 44+25 - SEE SHEET 43
MATCHLINE STA 38+75 - SEE SHEET 41
BID ALTERNATE 3
STA 38+75 TO STA 44+25
50 PRINCETON AVENUE
45+00 46+00 47+00 48+00 49+00
50+00
R&R 0.33' HMA
(~10'X12')
R&R 0.33' HMA
(~6'X70')
R&R 0.33' HMA
(~6'X90')
TYPICAL SECTION NO. 7
R&R 0.25' HMA
(~12'X200')
R&R 0.25' HMA
(~8'X8')
TRANSVERSE PAVING LIMIT C
C8
47 45
44 46
48 49
25' 25'
PAVEMENT TRANSITION D
PAVEMENT
TRANSITION C
R&R PCC C&G
(~46LF)REMOVE & REPLACE
SIDEWALK UNDERDRAIN
R&R PCC C&G
(~13LF)
TRANSVERSE PAVING LIMIT C
(~6'X6')
R&R 0.33' HMA
(~6'X170')
TYPICAL SECTION NO. 8
R&R PCC C&G
(~8LF)
NORTH KELLOGG AVENUE
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 7
5'
KEYCUT A1
5'
KEYCUT A1
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
0.17' HMA SURFACE COURSE
HMA-SP50 (PG 64-10) NEW PAVEMENT SURFACE
EX. PAVEMENT
SURFACE
NOTE:
1. SEE PLAN FOR LOCATION. WHERE R&R'S ARE LOCATED UNDER KEYCUTS,
PAVEMENT SHALL BE REMOVED TO THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
R&R (SEE PLAN FOR
LOCATION & DEPTH)
NTS
TYPICAL SECTION NO. 8
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.21' HMA-SP50 (PG 64-10) SURFACE COURSE. TAPER
FROM 0.17' TO 0.21' OVER 5'.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
45+00 46+00 47+00 48+00 49+00
50+00
NORTH KELLOGG AVENUE
CONTINENTAL STYLE CROSSWALK
EXISTING FIRE HYDRANT
REPLACE BLUEMARKER
STOP SYMBOL (TYP.)
CONTINENTAL STYLE CROSSWALK2' WIDE BARS BY 12' LONG (TYP.)1' WIDE STANDARDSTOP BAR (TYP.) 10' 10' 10'
10'
10'
10' 10' 10'
DETAIL 27B PARKING LINE (TYP.)DETAIL 27B PARKING LINE (TYP.)
PRINCETON AVENUE
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 50+75 - SEE SHEET
44 MATCHLINE STA 44+25 - SEE SHEET 42
KEY MAP
NTS
BERKELEY ROAD
SYLVAN DRIVE TO EAST END
BORING LOG
NO. HMA FABRIC (Y/N)
C8 5" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY
FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT
IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 50+75 - SEE SHEET
44 MATCHLINE STA 44+25 - SEE SHEET 42
BID ALTERNATE 3
STA 44+25 TO STA 50+75
51 SAN JOSE CREEK / CITY LIMITS
X X X X X X X X
51+00 52+00 53+00 54+00 55+00
R&R 0.25' HMA
(~6'X10')
TYPICAL SECTION NO. 8
R&R 0.25' HMA
(~12'X100')
R&R 0.25' HMA
(~6'X6')
R&R 0.25' HMA
(~6'X8')
TYPICAL SECTION NO. 8
PROTECT EX. FENCE IN PLACER
R
RR&R PCC C&G
(~8LF)
R&R PCC C&G
(~40LF) R&R PCC C&G
(~30LF)
R&R 0.25' HMA
(~6'X11') R
R&R 0.25' HMA
(~6'X10')R
R&R PCC C&G
(~30LF)
PROTECT EX. MAILBOX IN PLACE
C9
R&R 0.25' HMA
(~12'X200')
N KELLOGG AVE
SOMERSET DR
DR
HANNAPAREJO
DR
217
CAMBRIDGE DR
ARUNDEL RD
WAKEFIELD DR
N FAIRVIEW AVE
ENCINA RD
CALLE REAL
CATHEDRAL OAKS RD
KINGSTON AVE
ARMITOS AVE
MANDARIN DR
ALONDRA DR
CAMINO
CAMPANA
BERKELEY RD
SHIRRELL WAY
STOW CANYON RDVIA SALERNO
SAN PATRICIO DR
LA GOLETA RD
NTS
TYPICAL SECTION NO. 8
0.17' BELOW
GUTTER LIP
0.17' BELOW
GUTTER LIP
5'5'
0.17'
R&R (SEE PLAN FOR
LOCATION & DEPTH)
HMA LIFT THICKNESS:
1. 0.21' HMA-SP50 (PG 64-10) SURFACE COURSE. TAPER
FROM 0.17' TO 0.21' OVER 5'.
NOTE:
1. AT R&R LOCATIONS, PAVEMENT SHALL BE REMOVED TO
THE SPECIFIED DEPTH AS MEASURED FROM THE MILLED
SURFACE, NOT THE EXISTING PAVEMENT SURFACE.
SAN JOSE CREEK / CITY LIMITS
51+00 52+00 53+00 54+00 55+00
X X X X X X X X
10'
10'
10'
10'
DETAIL 27B PARKING LINE (TYP.)
DETAIL 27B PARKING LINE (TYP.)
SHARED ROADWAY BICYCLE MARKING
(TYP.)
SHARED ROADWAY BICYCLE MARKING
(TYP.)
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_BERKELEY ROAD - (FAIRVIEW AVENUE TO CITY LIMITS).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
MATCHLINE STA 50+75 - SEE SHEET 43
KEY MAP
NTS
BERKELEY ROAD
SYLVAN DRIVE TO EAST END
BORING LOG
NO. HMA FABRIC (Y/N)
C8 5" N
*CORING DATA IS FOR INFORMATION
ONLY. EXISTING SECTION MAY VARY
FROM SECTION(S) FOUND AT CORING
LOCATION(S). FABRIC MAY BE PRESENT
IN SECTIONS EVEN IF NOT FOUND AT
CORING LOCATION(S).
BERKELEY ROAD - PAVEMENT TREATMENT LIMITS
BERKELEY ROAD - STRIPING LAYOUT
MATCHLINE STA 50+75 - SEE SHEET 43
BID ALTERNATE 3
STA 50+75 TO STA 55+08
52 C1
C2
C3
C4
TYPICAL SECTION NO. 9
HOLLISTER AVENUE
CASTILIAN DRIVE
33+00
34+00
35+00
36+00
37+00
TREATMENT LIMIT @
CHANGE OF PAVEMENT
TREATMENT LIMIT @
CHANGE OF PAVEMENT
50 MESA RD
HOLLISTER AVE
LOS CARNEROS RD
CREMONA DR
CASTILLIAN DR
TYPICAL SECTION NO. 9
NTS
0.63'
MEDIAN
WIDTH
(VARIES)
0.63'
HMA LIFT THICKNESSES:
1. PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE.
2. PLACE 0.21' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE.
3. PLACE 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE.
33+00
34+00
35+00
36+00
37+00
TYPE IV (L) ARROW
(TYP.)
EXISTING FIRE HYDRANT
REPLACE BLUEMARKER
REPLACE BLUE
MARKER
EXISTING FIRE HYDRANT
NEW LADDER STYLECROSSWALK (TYP.)
DETAIL 38ADETAIL 12 WITH TYPE G MARKERSDETAIL 38ADETAIL 25 WITH TYPE D MARKERSDETAIL 25 WITH TYPE D MARKERSDETAIL 12 WITH TYPE G MARKERSDETAIL 39 HELMETED BICYCLIST SYMBOL MUTCDFIGURE 9C-3 WHITE AND GREEN PAINT(TYP.) DETAIL 39A WITH GREEN PAINT
DETAIL 39
DETAIL 38A
DETAIL 36
11' 11'
10'
3.5'
9'
8'
12'
12'
12' 12'
±8'
12'
11'
11'
±8'90'
50' 50'
±100'
200'
50'
225'
50'
76.5'
140'
12'
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_LOS CARNEROS ROAD (HOLLISTER AVENUE TO CASTILIAN DRIVE).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTSNTS
LOS CARNEROS ROAD
HOLLISTER AVENUE TO CASTILIAN DRIVE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 5" 7" 12 N
C2 4" 10" - N
C3 5" 9" - N
C4 4-3/4" 11" -N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
LOS CARNEROS ROAD - PAVEMENT TREATMENT LIMITS
LOS CARNEROS ROAD - STRIPING LAYOUT
CONSTRUCTION NOTES:
1. CONTRACTOR SHALL ONLY REMOVE MATERIAL QUANTITIES THAT CAN BE REPLACED WITH HMA UP TO 2 INCHES BELOW THE FINISH
GRADE DURING THE SAME WORK DAY UNLESS DIRECTED BY THE
CITY.
2. CONTRACTOR SHALL PLACE ENTIRE SURFACE COURSE WITHIN THE SAME WORK DAY UNLESS DIRECTED BY THE CITY.
BID ALTERNATE 4
STA 32+93 TO STA 35+86
53 SALISBURY AVENUE LANCASTER PLACE
BRADFORD DRIVESAINT GEORGE PLACE
C1
51 52
53 54 55
56 57
58 59
TYPICAL SECTION NO. 10
25'
25'
TREATMENT LIMIT @
CHANGE OF PAVEMENT
11+00
12+00 13+00 14+00 15+00 16+00 17+
CALLE REAL
DARTMOOR AVE
HEMPSTEAD AVE
LANCASTER PL
SALISBURY AVE
BRADFORD DR
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:
1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.
2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.
3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.
4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.
5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"
0.83'
1.25'
LANCASTER PLACE
BRADFORD DRIVESAINT GEORGE PLACE
RED CURB±125'
LADDER STYLE CROSSWALK(TYP.)
YIELD LINE(TYP.)
RED CURB ±16
EXISTINGR1-5
EXISTINGR1-5
STOP SYMBOL(TYP.)
DETAIL 27B
DETAIL 39 (TYP.)
DETAIL 39 (TYP.)
DETAIL 41 (TYP.)
DETAIL 39A (TYP.)DETAIL 39A (TYP.)DETAIL 22 (TYP.)
RED CURB ±170'
6'
10'10'
6'
8'
±8'
10'
RED CURB ±25'
RED CURB ±146'
RED CURB ±70'
RED CURB ±40'
STOP SYMBOL(TYP.)
±91'
±16
±71'
±146'
EXISTING FIRE HYDRANT
REPLACE BLUE
MARKER
REPLACE BLUE
MARKER
EXISTING FIREHYDRANT
SALISBURY AVENUE
11+00
12+00 13+00 14+00 15+00 16+00 17+
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (ROCHESTER WAY TO SALISBURY AVENUE).DWG Plot Date: 1/23/2025 3:19 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 17+00 - SEE SHEET 47
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL
ROCHESTER WAY TO SALISBURY AVENUE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C1 4" 10" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 5
STA 10+81 TO STA 17+00
MATCHLINE STA 17+00 - SEE SHEET 47
54 SAINT IVES PLACE SAINT ALBANS PLACE DARTMOOR AVENUE
SAINT CHARLES PLACE SAINT CHARLES PLACE
C2
C3
60 61
62 63
6564
66 68
67 TYPICAL SECTION NO. 10
+00 18+00 19+00 20+00 21+00 22+00 23+00
CALLE REAL
DARTMOOR AVE
HEMPSTEAD AVE
LANCASTER PL
SALISBURY AVE
BRADFORD DR
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:
1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.
2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.
3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.
4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.
5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"
0.83'
1.25'
SAINT IVES PLACE SAINT ALBANS PLACE DARTMOOR AVENUE
SAINT CHARLES PLACE SAINT CHARLES PLACE
RELOCATER1-5
RELOCATER1-5
DETAIL 29
DETAIL 29
DETAIL 39A (TYP.)DETAIL 39A (TYP.)
DETAIL 22 (TYP.)
DETAIL 39 (TYP.)DETAIL 39 (TYP.)
DETAIL 41 (TYP.)
LADDER STYLECROSSWALK(TYP.)
YIELD LINE
(TYP.)
STOP SYMBOL
(TYP.)
RED CURB ±57
RED CURB ±97'
RED CURB ±101'
RED CURB ±17'
RED CURB ±70'
RED CURB ±61'
RED CURB ±34'
RED CURB ±65'
RED CURB ±35'
RED CURB ±29'
RED CURB ±30'
RED CURB ±11'
8'6'
10'
6'
7'
10'
8'
±67'
STOP SYMBOL(TYP.)
±70'
7'
+00 18+00 19+00 20+00 21+00 22+00 23+00
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (ROCHESTER WAY TO SALISBURY AVENUE).DWG Plot Date: 1/23/2025 3:20 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 17+00 - SEE SHEET 46
MATCHLINE STA 23+50 - SEE SHEET 47
CALLE REAL
ROCHESTER WAY TO SALISBURY AVENUE
BORING LOG
NO. HMA AB R-VALUE FABRIC (Y/N)
C2 3-1/4" 10" 11 N
C3 3 10" - N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC
MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 5
STA 17+00 TO STA 23+50
MATCHLINE STA 17+00 - SEE SHEET 46
MATCHLINE STA 23+50 - SEE SHEET 47
55 © 2023 Microsoft Corporation ©
2 ROCHESTER AVENUE
79'
TREATMENT LIMIT @
CHANGE OF PAVEMENT
24+00 25+00 26+00
27+00
HEMPSTEAD AVENUE
CALLE REAL
DARTMOOR AVE
HEMPSTEAD AVE
LANCASTER PL
SALISBURY AVE
BRADFORD DR
TYPICAL SECTION NO. 10
NTS
CONSTRUCTION SEQUENCE:
1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 1.25'.
2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 0.42'.
3. CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 0.83'; REGRADE ROADWAY SURFACE TO 2-5% CROSS SLOPE.
4. PLACE 0.21' HMA-SP65 (PG 64-10) BASE COURSE.
5. PLACE 0.21' HMA-SP65 (PG 64-10) SURFACE COURSE.
5"
0.83'
1.25'
© 2023 Microsoft Corporation ©
2 ROCHESTER AVENUE
6'
10'
6'
RED CURB ±65'
RED CURB ±170'
10'
100'
±72'
24+00 25+00 26+00
27+00
HEMPSTEAD AVENUE
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_CALLE REAL - (ROCHESTER WAY TO SALISBURY AVENUE).DWG Plot Date: 1/23/2025 3:20 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
SEAL:
(PAVING ONLY) (STRIPING ONLY)
KEY MAP
NTS
MATCHLINE STA 23+50 - SEE SHEET 47
CALLE REAL
ROCHESTER WAY TO SALISBURY AVENUE
CALLE REAL - PAVEMENT TREATMENT LIMITS
CALLE REAL - STRIPING LAYOUT
BID ALTERNATE 5
STA 23+50 TO STA 27+19
MATCHLINE STA 23+50 - SEE SHEET 47
56 CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/24/2025 1:14 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
CURB RAMP SUMMARY TABLE
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/24/2025 1:14 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
CURB RAMP SUMMARY TABLE
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/24/2025 1:14 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
CURB RAMP SUMMARY TABLE
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_TITLE SHEET.DWG Plot Date: 1/23/2025 3:20 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
CURB RAMP PAY ITEMS
CASE A CURB RAMP W/ CURB & GUTTER CASE B CURB RAMP W/ CURB & GUTTER
CASE C CURB RAMP W/ CURB & GUTTER
LEGEND
PCC RETAINING CURB
PCC CURB & GUTTER
PCC CURB RAMP & SIDEWALK
CASE A CURB RAMP W/ SPANDREL & CROSS GUTTER CASE B CURB RAMP W/ SPANDREL & CROSS GUTTER CASE C CURB RAMP W/ SPANDREL & CROSS GUTTER
HMA CONFORM
PCC CROSS GUTTER
PCC SPANDREL
DETECTABLE WARNING SURFACE
NOTE
THESE DIAGRAMS ARE FOR REFERENCING GENERAL PAY ITEMS FOR THE
DIFFERENT CURB RAMP COMPONENTS ONLY AND SHOULD NOT BE USED AS A BASIS FOR THEIR LAYOUTS. PLEASE REFER TO THE APPROPRIATE
PLAN SHEETS, STANDARD DRAWINGS AND DETAILS, SPECIFICATIONS, AND ENGINEER FOR CONSTRUCTION GUIDANCE.
60 20.7'
NORTH FAIRVIEW AVENUE
6.5'
6'
8'
6.8'5'
4.5'
5'
6'
7'
5.8'
4'-2"
5.6'
4'-2"
6'
6'
4'
4'
6'
6'
8.7'
4'-2"
5.6'
3.7'
10'
10.2'
71 1
1 1
2 5
8.3'
3' 3' 5' 4'
BERKELEY ROAD
21.1' 19.6' 19.2' 16.4' 13.6'8.5'20.7'
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,
0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1
TACK COAT ALL VERTICAL
EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER
LIP OR SPANDREL
NOTES:
1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN
0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.
POWER POLE
PORTLAND CEMENT CONCRETE IMPROVEMENTS
INSTALL DETECTABLE WARNING SURFACE
LEGEND
FL FLOW LINE
DESIGN ELEVATION
TP TOP OF PAVEMENT
TC TOP OF CURB
SW SIDEWALK
WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)
MANHOLE COVER
ROADSIDE SIGN (EX.)
RIGHT-OF-WAY LINE
SURVEY NAIL
EP EDGE OF PAVEMENT
PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.
LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)
GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:
1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.
2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.
WATER METER COVER
VAULT COVER (EX)
LEGEND
REMOVE & REPLACE/ CONSTRUCT PCC CURB
HIGH POINTHP
& LANDSCAPE RESTORATION
R/W
BACKFILL W/ NATIVE SOIL, REGRADE,
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 01.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
NORTH FAIRVIEW AVENUE @ BERKELEY ROAD
ENLARGEMENT
CURB RAMPS
ENLARGEMENT NOTES:
PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.
REMOVE & REPLACE PCC SPANDREL AND CROSS GUTTER PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.
LOWER UTILITY PRIOR TO COLD PLANE.
PROTECT-IN-PLACE EXISTING RETAINING WALL.
1 2
5 7
NORTH FAIRVIEW AVENUE @
BERKELEY ROAD
61 5' 3'
6.7' 6'
3.7'
4.8'
C2
C3
C4
C1
N89°55'58"E
21.11'
S01°0119'19"W
19.19'
2.5'
17'
4'-2"
11.2'
5.8'
7'
8'
5'
2' MIN.
2' MIN.
6'
2' MIN.
HOLLISTER AVENUE
1003
47.48 SPINDLE
STORKE ROAD
8 8
1 8
6' 7.3'
R/W
R/W
2'
5 C5
3.7'
203
47.79 TAG LS6098
9.3'
3'
DH
9.3'
3'
9'
7.7'
5.2'
7.5'
4'
4.5'
2' MIN.
2' MIN.
8'
5'
13 1
1 301
48.60 CP MAG NAIL
STORKE ROAD
R/W
R/W
2.7'
HOLLISTER AVENUE
18 4'
4'
4'
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,
0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1
TACK COAT ALL VERTICAL
EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER
LIP OR SPANDREL
NOTES:
1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN
0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 03.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
STORKE ROAD @ HOLLISTER AVENUE
ENLARGEMENT
POWER POLEPORTLAND CEMENT CONCRETE IMPROVEMENTS
INSTALL DETECTABLE WARNING SURFACE
LEGEND
FL FLOW LINE
DESIGN ELEVATION
TP TOP OF PAVEMENT
TC TOP OF CURB
SW SIDEWALK
WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)
MANHOLE COVER
ROADSIDE SIGN (EX.)
RIGHT-OF-WAY LINE
SURVEY NAIL
EP EDGE OF PAVEMENT
PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.
LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)
GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
WATER METER COVER
VAULT COVER (EX)
LEGEND
REMOVE & REPLACE/CONSTRUCT PCC CURB
CURVE TABLE
CURVE # LENGTH RADIUS DELTA
C1 2.61 1.00 149.3489
C2 29.41 68.00 24.7805
C3 2.51 1.00 144.0424
C4 3.19 2.00 91.3892
C5 2.83 5.00 32.42222
CURB RAMPS
NOTES:
1. SEE SHEET XX FOR CURB RAMPS & CONSTRUCTION NOTES FOR CURB RAMPS.
2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.
HP HIGH POINT
ENLARGEMENT NOTES:
PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.
LOWER UTILITY PRIOR TO COLD PLANE.
CONSTRUCT TYPE A CURB PER SANTA BARBARA COUNTY ENGINEERING STANDARD DETAIL 4-030.
REMOVE & REPLACE EXISTING PCC CURB. PAINT CURB TO MATCH EXISTING.
PROTECT IN PLACE EXISTING LOOP DETECTOR HANDHOLE.
1 8
13 18
5 R/W
& LANDSCAPE RESTORATION
BACKFILL W/ NATIVE SOIL, REGRADE,
STORKE ROAD @ HOLLISTER AVENUE
62 STORKE ROAD
MARKETPLACE DRIVE
1 1
1 1
10 R/W
R/W
6'
4'-2"
11.2'
8.5'
5.5'
11.6'
10.9'
5'
7'
4'
2'
7.7'
4'
12'
3 3
10 9.5'
5.1'
9.2'
4'-2"
8.9'2.8'
9.2'
6'3.3'
6'
R =3.00'
L =4.01'
Δ =76°33'29"
15 8'
5'
2'
2'
18 1701
99.18 CP MAG NAIL
14.2'
27.2'
35.3'
28.1'
POWER POLE
PORTLAND CEMENT CONCRETE IMPROVEMENTS
INSTALL DETECTABLE WARNING SURFACE
LEGEND
FL FLOW LINE
DESIGN ELEVATION
TP TOP OF PAVEMENT
TC TOP OF CURB
SW SIDEWALK
WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)
MANHOLE COVER
ROADSIDE SIGN (EX.)
RIGHT-OF-WAY LINE
SURVEY NAIL
EP EDGE OF PAVEMENT
PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.
LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)
GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:
1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.
2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.
WATER METER COVER
VAULT COVER (EX)
LEGEND
REMOVE & REPLACE/ CONSTRUCT PCC CURB
HIGH POINTHP
& LANDSCAPE RESTORATION
R/W
BACKFILL W/ NATIVE SOIL, REGRADE,
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,
0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1
TACK COAT ALL VERTICAL
EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER
LIP OR SPANDREL
NOTES:
1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN
0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 03.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
STORKE ROAD @ MARKETPLACE DRIVE
ENLARGEMENT
CURB RAMPS
ENLARGEMENT NOTES:
PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.
REMOVE & REPLACE PCC SPANDREL PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.
RELOCATE EXISTING TRAFFIC BOX TO NEW LOCATION ION PLANS. ADJUST TRAFFIC BOX TO FINISHED GRADE.
SAWCUT & REMOVE PCC SIDEWALK & BACKFILL & REGRADE W/ CLEAN TOPSOIL. GRADE TO 1" BELOW TOP OF ADJACENT CONCRETE SURFACE & LIGHTLY TAMP BACKFILL TO PREVENT FUTURE SETTLEMENT.
PROTECT IN PLACE EXISTING LOOP DETECTOR HANDHOLE.
1 3
10 15
18 STORKE ROAD @ MARKETPLACE DRIVE
63 9'
2'
5'
4'-2"
10'
4.1'
5.2' C1
16'
5'
2'
2'
6 3.3' MIN.
6'
4'-2"
10 1.9'
4'
5'
10'
2'
0.5'
4.7'
7'
2'
10.5'
6'
5'
5'
4.6'
3.9' MIN.
1 1
1 4'
STORKE ROAD
STORKE PLAZA
18 3 3
7 28.4'
17.5'
14.7'
25.2'
POWER POLE
PORTLAND CEMENT CONCRETE IMPROVEMENTS
INSTALL DETECTABLE WARNING SURFACE
LEGEND
FL FLOW LINE
DESIGN ELEVATION
TP TOP OF PAVEMENT
TC TOP OF CURB
SW SIDEWALK
WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)
MANHOLE COVER
ROADSIDE SIGN (EX.)
RIGHT-OF-WAY LINE
SURVEY NAIL
EP EDGE OF PAVEMENT
PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.
LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)
GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:
1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.
2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.
WATER METER COVER
VAULT COVER (EX)
LEGEND
REMOVE & REPLACE/ CONSTRUCT PCC CURB
HIGH POINTHP
& LANDSCAPE RESTORATION
R/W
BACKFILL W/ NATIVE SOIL, REGRADE,
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,
0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1
TACK COAT ALL VERTICAL
EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER
LIP OR SPANDREL
NOTES:
1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN
0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 03.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
CURB RAMPS
STORKE ROAD @ STORKE PLAZA
1 STORKE ROAD @ STORKE PLAZA
ENLARGEMENT
ENLARGEMENT NOTES:
PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE. TRAFFIC SIGNAL MODIFICATIONS TO BE PERFORMED BY OTHERS.
REMOVE & REPLACE PCC SPANDREL PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.
TRIM & REMOVE EX. PLANT MATERIAL @ BACK OF SIDEWALK.
PROTECT-IN-PLACE EXISTING RETAINING WALL.
RELOCATE EXISTING TRAFFIC BOX TO NEW LOCATION ION PLANS. ADJUST TRAFFIC BOX TO FINISHED GRADE.
PROTECT IN PLACE EXISTING LOOP DETECTOR HANDHOLE.
CURVE TABLE
CURVE # LENGTH RADIUS DELTA
C1 3.78 5.00 43.3531
3 6
7 10
18 64
2'
2'
4.5' 5.8' 9.2'
3.5'
5.8'
5'
5.3'
5.5'
4'
9'4.5'
5'
5'
9.7'
STORKE ROAD
BOLLAY DRIVE
2'
2'
7 3 3
24 11
232
103.30
CP MAG NAIL
22'
22.2'
20.9'
15.9'
NTS
REMOVE & REPLACE 0.67' HMA
REMOVE 0.67' PAVEMENT
PLACE 0.25' HMA-SP85 (PG 64-10) BASE COURSE,
0.25' HMA-SP85 (PG 64-10) INTERMEDIATE COURSE,
& 0.17' HMA-SP85 (PG 64-10) SURFACE COURSE
SEE NOTE 1
TACK COAT ALL VERTICAL
EDGES PRIOR TO PAVING
EX. PAVEMENT, GUTTER
LIP OR SPANDREL
NOTES:
1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN
0.13' OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.
POWER POLE
PORTLAND CEMENT CONCRETE IMPROVEMENTS
INSTALL DETECTABLE WARNING SURFACE
LEGEND
FL FLOW LINE
DESIGN ELEVATION
TP TOP OF PAVEMENT
TC TOP OF CURB
SW SIDEWALK
WATER VALVE COVER
(D=STORM DRAIN, S=SEWER, T=AT&T)
MANHOLE COVER
ROADSIDE SIGN (EX.)
RIGHT-OF-WAY LINE
SURVEY NAIL
EP EDGE OF PAVEMENT
PAVEMENT THICKNESS, WHICHEVER IS GREATER
HMA CONFORM: REMOVE & REPLACE 0.67' OR MATCH EX.
LIGHT STANDARD (EX.)
FIRE HYDRANT (EX.)
(TEL=TELECOM, TRAFFIC=TRAFFIC SIGNAL, ELEC=ELECTRICAL)
TRAFFIC SIGNAL POLE (EX.)
GRADE BREAK
SO. CAL. EDISON MH (EX.)
GB
DH LOOP DETECTOR HANDHOLE (EX.)
NOTES:
1. SEE SHEET 2 FOR GENERAL NOTES & CONSTRUCTION NOTES FOR CURB RAMPS.
2. SLOPES SHOWN ON PLANS ARE APPROXIMATE & PROVIDED FOR DESIGN REVIEW. CURB RAMP LAYOUT & CONSTRUCTION SHALL FOLLOW DESIGN ELEVATIONS & DIMENSIONS AS SHOWN ON THESE PLANS.
WATER METER COVER
VAULT COVER (EX)
LEGEND
REMOVE & REPLACE/ CONSTRUCT PCC CURB
HIGH POINTHP
& LANDSCAPE RESTORATION
R/W
BACKFILL W/ NATIVE SOIL, REGRADE,
CONTRACT No.
PROJECT No.
ACCOUNT No.DATE
DATE
DATE
CITY OF GOLETA
DEPARTMENT of PUBLIC WORKS
DESIGNED BY
DRAWN BY
BY
REVISIONS
DESCRIPTION
CHECK BY
REF. DATE
GOLETA, CA
SEAL:
Pavement Engineering Inc.
You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\230268\TASK 02\DRAWINGS\230268-02_GOLETA CURB RAMPS 02.DWG Plot Date: 1/23/2025 3:21 PM SCALE
2025 ARTERIAL
PAVEMENT PROJECT
STORKE ROAD @ BOLLAY DRIVE
ENLARGEMENT
ENLARGEMENT NOTES:
REMOVE & REPLACE PCC SPANDREL PER SANTA BARBARA COUNTY STANDARD DETAIL 4-020.
PROTECT-IN-PLACE EXISTING RETAINING WALL.
CUT & SET DOMES AROUND UTILITY BOX COVER.
PROTECT IN PLACE EXISTING FIRE HYDRANT.
3 CURB RAMPS
7 11
24 STORKE ROAD @ BOLLAY DRIVE
65 SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
T-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
SHEET INDEX
SHT. DESCRIPTION SHT NOS.
TITLE SHEET 1
PROJECT OVERVIEW 2
TYPICAL CROSS SECTIONS 3-4
KEY LINE GEOMETRY 5-10
LAYOUT 11-13
PROFILES 14
CONSTRUCTION DETAILS 15-19
EXISTING UTILITY AND CONFLICT PLAN 20-24
UTILITY CROSS SECTIONS 25-26
PAVEMENT DELINEATION AND SIGN PLAN 27
QUANTITIES 28
SURVEY CONTROL 29
TREE REMOVAL PLAN 30
GENERAL INFORMATION
CITY OF GOLETA:
130 Cremona Dr. Suite B
Goleta, CA 93111
(805) 722-4306
Contact: Kent Yankee
CIVIL ENGINEER:
Bengal Engineering
360 S. Hope Ave. Suite C-110
Santa Barbara, CA 93105
(805) 563-0788
Contact: Scott Onishuk
LAND SURVEYOR:
Reese Water and Land
Surveying Services
900 Los Osos Valley Road, Suite B
Los Osos, CA 93402-3206
(805) 439-2741
Contact: Robert Reese
RIGHT OF WAY AGENT:
Hamner-Jewell
4476 Market St # 601
Ventura, CA 93003-7775
(805) 427-2239
Contact: Don Irelan & Lillian Jewell
The City of Goleta Department of Public Works
PROJECT PLANS FOR CONSTRUCTION
CITY PROJECT NUMBER 9062
THE STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
CITY OF GOLETA, CALIFORNIA
TO BE SUPPLEMENTED BY CALTRANS STANDARD PLANS DATED 2018, SANTA BARBARA METROPOLITAN TRANSIT DISTRICT BUS STOP STANDARDS REVISED OCTOBER 1, 2004 AND
THE MOST CURRENT SANTA BARBARA COUNTY STANDARD PLANS AND SPECIFICATIONS
ANGELES
LOS
FRANCISCO
SAN
Selected Acronyms and Abbreviations
(See Catrans Std Plan A10A for complete list)
SANTA BARBARA COUNTY
BARBARA
SANTA
LOMPOC
SANTA MARIA
GOLETA
AB Aggregate Base
Abn Abandon
AC Asphalt Concrete
Adj Adjust
BB Beginning of Bridge
BC Beginning of Curve
BCR Beginning of Curb Return
Beg Begin
Bldg Building
BM Bench Mark
Bot Bottom
Br Bridge
Brg Bearing
BVC Beginning of Vertical Curve
BW Bottom of Wall
CAA Cable Anchor Assembly
C-C Center-to-center
Chnl Channel
CI Cast-iron
CIDH Cast In Drilled Hole
CIP Cast in place
CISS Cast in Steel Shell
CL Chain Link
Cl Class
C/L Centerline
Clr Clear
CM Corrugated Metal
Col Column
Conc Concrete
Cr Creek
D Depth
Deg Degree
Det Detail
DI Drainage Inlet
Dia Diameter
Diaph Diaphram
Dist Distance
Dwy Driveway
Ease Easement
EB East Bound
EC End of Curve
ECR End of Curb Return
EG Existing Ground
EOD Edge of Deck
EP Edge of Pavement
ES Edge of Shoulder
ETW Edge of Travelled Way
EVC End Vertical Curve
Exc Excavate
Exist Existing
Exp Expansion
Exp Jt Expansion Joint
Ext Exterior
F&C Frame and Cover
F&G Frame and Grate
Fdn Foundation
FES Flared End Section
FF Filter Fabric
FG Finished Grade
FH Fire Hydrant
Fig Figure
FL Flow Line
FOC Face of Concrete
FS Finished Surface
Ftg Footing
Ga Gauge
GP Grading Plane
Galv Galvanized
GR Guard Railing
Gtr Gutter
H Height
h, hr hour
HW headwall
Horz horizontal
HWM High water mark
HMA Hot Mix Asphalt
Irr Irrigation
Jct Junction
Jt Joint
L length
LOL layout line
LS lump sum
Lt Left
Max Maximum
MBGR Metal Beam Guard Rail
MH Manhole
Min Minimum
Misc Miscellaneous
Mod Modify
NTS Not to scale
Oblr Obliterate
OC Overcrossing
OD Outside Diameter
OG Original Ground
OH Overhead
O-O Out-to-out
Pp age
PB Pull box
PC Point of curvature or
Precast
PCC Pt of compound curvature
Ped Pedestrian
Perm Mtl Permeable Material
PG Profile Grade
PI Point of Intersection
P/L Property Line
PP Power Pole
Pipe Pile
POC Point on Curve
POT Point on Tangent
PRC Point of Reversing Curve
PS&E
Plans, specifcations & Estimate
PS Pre-Stressed
P/S Pre Stressed
PT Point of Tangent
Qty Quantity
R Radius
Reinf Reinforement
Rel Relocate
Ret Retaining
Rev Revised
RSP Rock Slope Protection
Rt Right
R/W Right of Way
Salv Salvage
SG Subgrade
Sht Sheet
Spec Special
Specification
Sta Station
Std Standard
Str Structure
SW Sidewalk
S Sewer
TC Top of Curb
TCB Traffic Control Box
TG Top of Grade
Top of Grate
TP Telephone Pole
Trans Transition
UON Unless otherwise noted
VV alve
Var Variable
VC Vertical Curve
W Width
WH Weep Hole
WM Wire Mesh
Water Meter
WW Wing Wall
WWLOL Wing Wall Layout line
SOUTH STORKE
HWY 101
HOLLISTER AVE
PHELPS RD
No Scale
VICINITY MAP
PROJECT LIMITS
TITLE SHEET
HOME
DEPOT
1 30
FINAL SUBMITTAL
CITY OF GOLETA
Reviewed by:
Signature Date
66 TYPICAL SECTION CONSTRUCTION NOTES:
MANY UNDERGROUND UTILITIES EXIST AND ARE NOT SHOWN.
SEE EXISTING UTILITY AND CONFLICT PLANS FOR MORE INFORMATION.
AB U S P A D
8" CONCRETE
18" AB (CLASS 2)
6" OVER-EX & RE-COMPACT SUB GRADE (95%)
B STORKE ROAD PLUG PAVING
7-1/2" AC
18" AB (CLASS 2)
C 3" COLD PLANE & TEMPORARY OVERLAY
D MAINLINE PAVEMENT RECONSTRUCTION
COLD PLANE 2-3/4" EXISTING SECTION
2" ARHM SURFACE COURSE
3/4" AC BASE COURSE
STRUCTURAL SECTIONS PER PLANS FROM
PAVEMENT ENGINEERING INC.
STORKE PAVEMENT REHABILITATION
SHEET 10 OF 39
TYPICAL SECTION NO. 3
E SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
F REMOVE EXISTING CURB, BASE AND PAVING
G MEDIAN TREATMENT:
CONTRACTOR TO PROTECT EXISTING LANDSCAPE AND
IRRIGATION FOR OWNER TO RECONSTRUCT LANDSCAPING AND
IRRIGATION SYSTEMS AFTER THE PUBLIC WORKS CONTRACT IS
COMPLETE.
H MEDIAN TREATMENT:
STAMPED CONCRETE, BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.
CONCRETE IS 4" MIN. THICKNESS
BEDDED ON 4" MIN. CLASS 4 SUB BASE (ROUND SAND)
LAYOUT CONSTRUCTION NOTES:
I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT
J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT
K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER
MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER
SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS
L REMOVE AND DISPOSE OF EXISTING BUS STOP STRUCTURES,
RETAINING WALL AND COMPONENTS, SEE SPECIAL PROVISIONS
M BUS PAD:
REINFORCED CONCRETE, SEE COUNTY OF SANTA BARBARA
STANDARD 5-120 & 5-130
N CURB:
SEE COUNTY OF SANTA BARBARA STANDARD 4-030, TYPE A
O CURB & GUTTER:
SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
Q MEDIAN CURB:
SEE COUNTY OF SANTA BARBARA STANDARD 4-035
R MEDIAN CONCRETE TREATMENT:
STAMPED CONCRETE; BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.
S RECONSTRUCT BRICK PAVERS AS NECESSARY TO MATCH NEW
SIDEWALK
BUS SHELTER NOTES:
T DEMOLISH EXISTING WOOD BUS SHELTER
U REMOVE 8" X 8" SUPPORT POSTS AND FOOTINGS
V CONSTRUCT NEW MTD BUS SHELTER BY LNI CUSTOM
MANUFACTURING, INC. THE 15' STRUCTURE WITH FOOTINGS AND
ANCHORS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
W REPAIR SIDEWALK WHERE POSTS AND FOOTINGS WERE LOCATED
AND MATCH ADJACENT GRADES WITH NEW CONCRETE
X PROTECT HARDSCAPE, FEATURES TO REMAIN.
Y REMOVE AND DISPOSE OF EXITING BENCHES AND TRASH CANS
AND REPLACE WITH NEW BENCHES AND TRASH CANS PER MTD
STANDARDS.
LEGEND:
CONCRETE
3" COLD PLANE &
TEMPORARY OVERLAY
PLUG PAVING
SEE TYPICAL SECTIONS
SAWCUT
STAMPED CONCRETE
BRICK PATTERN
DAYLIGHT
NEW RIGHT-OF-WAY
TCETCE
R/W
Exist R/W
Exist R/W
Exist R/W
EASE
P/L
EASE
EASE
EASE
073-440-016 073-440-024 073-440-018
R/W
R/W
073-100-024
073-100-032073-100-030073-100-004
073-140-004
073-140-030
073-100-019
R/W
R/W EASE EASE
073-100-025
073-100-033
47 48
49 50
51 52
53 54
55 56
27 28 29 30 31 32 33
"STO"
"STO"R/W
R/W
TCE
TCE
R/W
R/W
R/W
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
PO-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
PROJECT OVERVIEW
STORKE RD.
HOLLISTER AVE
MARKETPLACE DR.
CORTONA RD.
EXTEND
BUS PAD
MEDIAN MODIFICATIONS
REMOVE BUS STOP AND
RIGHT-TURN EXTENSION
REMODEL BUS SHELTER
NORTH
STORKE ROAD
SCALE 1" = 40'
00 40' 80'
2 30
NOTES:
CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE
ENGINEERED TRAFFIC CONTROL AND PHASING PLANS
IN COORDINATION WITH MAINLINE PAVEMENT REPAIR
PROJECT.
CONTRACTOR SHALL ALSO BE REQUIRED TO PROVIDE
STORM WATER CONTROL PLANS AND TEMPORARY /
PERMANENT BMPs AS A PORTION OF THE MAINLINE
PAVEMENT REPAIR PROJECT.
67 10' & VAR.VAR.
"MED" LINE
5+00 TO 10+62.34
FL
"MED" LINE
FL
VAR.
CL
"STO" LINE
51+50 TO 52+87.85
10' & VAR.
VAR.VAR.OG
PGPG
B B
FF
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D
G
SAWCUT
SAWCUTEXISTING 30" HDPE STORM DRAIN
(E) FL (E) FL
±35'10' BUS POCKET8.58'
CL
"BW-1" LINEDL
50' & VAR.
2% & VAR.1.5% MAX3
1 PG
OG
A
5'
COLD PLANE
& TEMP.
OVERLAY±12'
5'
SIDEWALK
FROM
HOME
DEPOT
1.5% MAX VAR.
EX. R/W
52.5'
"BUS" LINE
1+00 TO 2+28
FL
"STO" LINE
47+75 TO 49+02
SAWCUT
1'
C
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D
SEE CONSTRUCTION DETAILS FOR LAYOUT OF
INTERSECTING SIDEWALK FROM HOME DEPOT
E
E
F
B
EXISTING 48" HDPE STORM DRAIN
50' & VAR.8.58'
CL
PG
3 1
"BW-1" LINEDL
1.5% MAX
EX. R/W
52.5'
"STO" LINE
49+02 TO 49+72
"BUS" LINE
2+28 TO 2+98
FL
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
D
EXISTING BUS POCKET TO REMAIN
E
OG
EXISTING 48" HDPE STORM DRAIN
TYPICAL SECTION CONSTRUCTION NOTES:
MANY UNDERGROUND UTILITIES EXIST AND ARE NOT SHOWN.
SEE EXISTING UTILITY AND CONFLICT PLANS FOR MORE INFORMATION.
A BUS PAD
8" CONCRETE
18" AB (CLASS 2)
6" OVER-EX & RE-COMPACT SUB GRADE (95%)
B STORKE ROAD PLUG PAVING
7-1/2" AC
18" AB (CLASS 2)
C 3" COLD PLANE & TEMPORARY OVERLAY
D MAINLINE PAVEMENT RECONSTRUCTION
COLD PLANE 2-3/4" EXISTING SECTION
2" ARHM SURFACE COURSE
3/4" AC BASE COURSE
STRUCTURAL SECTIONS PER PLANS FROM
PAVEMENT ENGINEERING INC.
STORKE PAVEMENT REHABILITATION
SHEET 10 OF 39
TYPICAL SECTION NO. 3
E SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
F REMOVE EXISTING CURB, BASE AND PAVING
G MEDIAN TREATMENT:
CONTRACTOR TO PROTECT EXISTING LANDSCAPE AND
IRRIGATION FOR OWNER TO RECONSTRUCT LANDSCAPING AND
IRRIGATION SYSTEMS AFTER THE PUBLIC WORKS CONTRACT IS
COMPLETE.
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
X-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
TYPICAL SECTIONS
STORKE ROAD
SCALE 1" = 5'
005 ' 1 0'
3 30
68 CL
"STO" LINE
52+87.85 TO 54+30
9' & VAR. 12' & VAR.VAR.21' & VAR.
14' MAINLINE PAVEMENT
RECONSTRUCTION SEE
PAVEMENT ENGINEERING
INC. PLAN18'5.58'
DL
"BW-2"
LINE
"MED" LINE
5+00 TO 10+62.34
B B
B
FF
2 1 OG
PG
PG
PG
1.5% MAX
VAR. VAR.
VAR.
FLFL
74' TO 62'
"FL" LINE
2+00 TO 3+00
FL
R/W
D
H
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
F
DE
SAWCUT
SAWCUT
SAWCUT
SEE LAYOUTS FOR LIMITS OF
MEDIAN CONCRETE TREATMENT
EXISTING 30" HDPE STORM DRAIN
CL
"STO" LINE
54+30 TO 55+68
5' & VAR.9' & VAR.
PG
1.5% MAX
FL
5'
"BW-2"
LINE
±47'
"FL" LINE
3+00 TO 4+72
EX. R/W
62'
VAR.
B
F
E D D
EXISTING TO REMAIN
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLAN
MAINLINE PAVEMENT RECONSTRUCTION
SEE PAVEMENT ENGINEERING INC. PLANOG
SAWCUT
H
FILL IN "HOLE" WHERE
BUS STOP IS REMOVED
PARKWAY LANDSCAPING
AND IRRIGATION TO BE
INSTALLED AND MAINTAINED
BY PROPERTY OWNER
TYPICAL SECTION CONSTRUCTION NOTES:
MANY UNDERGROUND UTILITIES EXIST AND ARE NOT SHOWN.
SEE EXISTING UTILITY AND CONFLICT PLANS FOR MORE INFORMATION.
A BUS PAD
8" CONCRETE
18" AB (CLASS 2)
6" OVER-EX & RE-COMPACT SUB GRADE (95%)
B STORKE ROAD PLUG PAVING
7-1/2" AC
18" AB (CLASS 2)
C 3" COLD PLANE & TEMPORARY OVERLAY
D MAINLINE PAVEMENT RECONSTRUCTION
COLD PLANE 2-3/4" EXISTING SECTION
2" ARHM SURFACE COURSE
3/4" AC BASE COURSE
STRUCTURAL SECTIONS PER PLANS FROM
PAVEMENT ENGINEERING INC.
STORKE PAVEMENT REHABILITATION
SHEET 10 OF 39
TYPICAL SECTION NO. 3
E SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
F REMOVE EXISTING CURB, BASE AND PAVING
G MEDIAN TREATMENT:
CONTRACTOR TO PROTECT EXISTING LANDSCAPE AND
IRRIGATION FOR OWNER TO RECONSTRUCT LANDSCAPING AND
IRRIGATION SYSTEMS AFTER THE PUBLIC WORKS CONTRACT IS
COMPLETE.
H MEDIAN TREATMENT:
STAMPED CONCRETE, BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.
CONCRETE IS 4" MIN. THICKNESS
BEDDED ON 4" MIN. CLASS 4 SUB BASE (ROUND SAND)
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
X-2
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
TYPICAL SECTIONS
STORKE ROAD
SCALE 1" = 5'
005 ' 1 0'
4 30
69 L1
C1
L2
C2
L3
201
202
101
102
102
"STO" LINE
"SAW-1" LINE
"BW-1" LINE
"BUS" LINE
1 2
3 4
10 10
10+00.00 BEG
10+62.02 END
10+09.23 BC
10+47.27 BC
10+19.70 EC
10+57.88 EC
1+00.00 BEG
2+28.32 END
1+07.36 BC
1+29.03 BC
1+16.87 EC
1+38.55 EC
"SW" LINE
L43 C16
L44
C17
L45
L47
48 49
50 "BUS" LINE
SEGMENT ID
L1
C1
L2
C2
L3
START
STATION
1+00.00
1+07.36
1+16.87
1+29.03
1+38.55
START
NORTHING
1983291.08
1983298.44
1983307.76
1983319.16
1983328.49
START
EASTING
5997852.19
5997852.37
5997850.80
5997846.55
5997844.99
LENGTH
7.36 9.51
12.16 9.51
89.77 END
STATION
1+07.36
1+16.87
1+29.03
1+38.55
2+28.32
DIRECTION/
DELTA
N01°21'43"E
021°47'43"
N20°26'00"W
021°48'05"
N01°22'05"E
RADIUS
25.00 25.00
"SW" LINE
SEGMENT ID
L43
C16
L44
C17
L45
START
STATION
10+00.00
10+09.23
10+19.70
10+47.27
10+57.88
START
NORTHING
1983366.31
1983366.22
1983371.13
1983394.88
1983399.79
START
EASTING
5997793.17
5997802.40
5997811.11
5997825.13
5997833.98
LENGTH
9.23 10.47
27.57 10.61
4.13 END
STATION
10+09.23
10+19.70
10+47.27
10+57.88
10+62.02
DIRECTION/
DELTA
S89°26'20"E
060°00'00"
N30°33'40"E
060°48'24"
S88°37'55"E
RADIUS
10.00 10.00
"STO" LINE
SEGMENT ID
L47
START
STATION
10+01.40
START
NORTHING
1979517.55
START
EASTING
5997804.00
LENGTH
4655.32
END
STATION
56+56.72
DIRECTION/
DELTA
N01°22'05"E
RADIUS
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
KEY LINE GEOMETRY
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
5 30
70 302
303
402
403
505
506
507
508
509
510
2+00.00 BEG
2+60.12 BC
3+12.06 BC
2+80.85 EC
3+36.81 EC
1 2
3 5+00.00 BEG
10+62.34 END
5+38.21 BC
5+74.41 BC
7+74.04 BC
9+17.90 BC
10+01.55 BC
5+58.17 EC
5+92.49 EC
7+87.39 EC
9+56.20 EC
10+38.51 EC
5 6
7 8
9 10
L4
C3
L5
C4
L7
C6
L8
C7
L9
C8
L10
C9
L11
C10
L12
"MED" LINE
"FL" LINE
"BW-2" LINE
"SAW-2" LINE
"SAW-3" LINE
"STO" LINE
"SAW-3" LINE
52 53
54 "FL" LINE
SEGMENT ID
L4
C3
L5
C4
START
STATION
2+00.00
2+60.12
2+80.85
3+12.06
START
NORTHING
1983816.45
1983876.57
1983897.04
1983927.06
START
EASTING
5997842.67
5997842.45
5997845.26
5997853.77
LENGTH
60.11 20.73
31.21 24.75
END
STATION
2+60.12
2+80.85
3+12.06
3+36.81
DIRECTION/
DELTA
N00°12'49"W
016°03'04"
N15°50'15"E
014°28'10"
RADIUS
74.00 98.00
"MED" LINE
SEGMENT ID
L7
C6
L8
C7
L9
C8
L10
C9
L11
C10
L12
START
STATION
5+00.00
5+38.21
5+58.17
5+74.41
5+92.49
7+74.04
7+87.39
9+17.90
9+56.20
10+01.55
10+38.51
START
NORTHING
1983945.45
1983907.25
1983887.50
1983871.84
1983853.98
1983672.43
1983672.30
1983802.74
1983840.74
1983884.86
1983921.53
START
EASTING
5997886.33
5997885.42
5997887.84
5997892.13
5997894.57
5997895.24
5997903.84
5997908.17
5997904.37
5997893.90
5997890.06
LENGTH
38.21 19.96
16.24 18.07
181.55
13.35 130.51
38.31 45.34
36.97 23.82
END
STATION
5+38.21
5+58.17
5+74.41
5+92.49
7+74.04
7+87.39
9+17.90
9+56.20
10+01.55
10+38.51
10+62.34
DIRECTION/
DELTA
S01°22'05"W
016°41'57"
S15°19'53"E
015°07'04"
S00°12'49"E
177°53'04"
N01°54'07"E
015°14'33"
N13°20'25"W
014°42'30"
N01°22'05"E
RADIUS
68.50 68.50
4.30 144.00
144.00
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-2
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
MATCHLINE 54+40
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
KEY LINE GEOMETRY
6 30
71 28
57 304 4043+97.51 BC
4+71.82 EC-END
4 5
4 11
12 L6
C5
"BW-2" LINE
"SAW-2" LINE
"STO" LINE
"HOL" LINE
"STO-N" LINE
"MED" LINE
"FL" LINE
55 56
56 "FL" LINE
SEGMENT ID
L6
C5
START
STATION
3+36.81
3+97.51
START
NORTHING
1983951.47
1984012.15
START
EASTING
5997857.46
5997858.91
LENGTH
60.70 74.31
END
STATION
3+97.51
4+71.82
DIRECTION/
DELTA
N01°22'05"E
021°17'14"
RADIUS
200.00
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-3
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
MATCHLINE 54+40
KEY LINE GEOMETRY
7 30
72 48
49 50
"STO" LINE
"SAW-1" LINE
"BW-1" LINE
"BUS" LINE
1 2
3 4
101
102
101+00.00 BEG
101+05.04 AP
101+11.40 BC
101+23.12 EC
101+25.19 BC
101+37.97 EC
102+77.45 AP
102+87.36 AP
102+98.19 END
201
202
201+00.00 BEG
202+27.00 END
201+60.94 AP
201+96.39 AP
201+22.29 AP
L13
L14
C11
L15
C12
L16
L17
L18
L19
L20
L21
L22
10 10
"SW" LINE
"SAW-1" LINE
SEGMENT ID
L19
L20
L21
L22
START
STATION
201+00.00
201+22.29
201+60.94
201+96.39
START
NORTHING
1983290.91
1983313.19
1983351.81
1983387.27
START
EASTING
5997859.42
5997860.06
5997861.40
5997861.68
LENGTH
22.29 38.65
35.46 30.61
END
STATION
201+22.29
201+60.94
201+96.39
202+27.00
DIRECTION/
DELTA
N01°39'14"E
N01°59'00"E
N00°27'28"E
N00°18'12"E
RADIUS
"BW-1" LINE
SEGMENT ID
L13
L14
C11
L15
C12
L16
L17
L18
START
STATION
101+00.00
101+05.04
101+11.40
101+23.12
101+25.19
101+37.97
102+77.45
102+87.36
START
NORTHING
1983291.39
1983296.37
1983302.69
1983314.22
1983316.16
1983328.69
1983468.12
1983477.82
START
EASTING
5997839.19
5997839.94
5997840.65
5997839.24
5997838.51
5997836.41
5997839.74
5997837.67
LENGTH
5.04 6.36
11.73 2.07
12.78 139.47
9.92 10.83
END
STATION
101+05.04
101+11.40
101+23.12
101+25.19
101+37.97
102+77.45
102+87.36
102+98.19
DIRECTION/
DELTA
N08°34'24"E
N06°26'37"E
026°52'38"
N20°26'00"W
021°48'05"
N01°22'05"E
N12°02'52"W
N07°47'39"W
RADIUS
25.00 33.58
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-4
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
KEY LINE GEOMETRY
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
8 30
73 52
53 54
"MED" LINE
"FL" LINE
"BW-2" LINE
"SAW-2" LINE
"SAW-3" LINE
"STO" LINE
"SAW-3" LINE
1 2
3 302
303
302+00.00 BEG
302+05.03 AP
302+60.14 BC
302+89.47 BC
302+82.44 EC
302+97.05 EC
402
403
402+00.00 BEG
402+30.21 AP
402+66.34 AP
403+14.20 AP
510505
506
507
508
509
510
5 6
7 8
9 10
505+00.00 BEG 510+93.64 END
506+12.59 AP
506+48.95 AP
507+00.30 AP
507+81.70 AP
508+10.04 AP
510+35.46 AP
L23
L24
C13
L25
C14
L29
L30
L31
L36
L37
L38
L39
L40
L41
L42
"BW-2" LINE
SEGMENT ID
L23
L24
C13
L25
C14
START
STATION
302+00.00
302+05.03
302+60.14
302+82.44
302+89.47
START
NORTHING
1983816.43
1983821.43
1983876.55
1983898.56
1983905.33
START
EASTING
5997836.56
5997837.07
5997836.87
5997839.89
5997841.81
LENGTH
5.03 55.11
22.29 7.04
7.58 END
STATION
302+05.03
302+60.14
302+82.44
302+89.47
302+97.05
DIRECTION/
DELTA
N05°47'47"E
N00°12'49"W
016°03'04"
N15°50'15"E
014°28'10"
RADIUS
79.58 30.00
"SAW-3" LINE
SEGMENT ID
L36
L37
L38
L39
L40
L41
L42
START
STATION
505+00.00
506+12.59
506+48.95
507+00.30
507+81.70
508+10.04
510+35.46
START
NORTHING
1983945.69
1983833.13
1983796.77
1983746.65
1983665.25
1983665.36
1983890.65
START
EASTING
5997876.33
5997873.64
5997873.78
5997884.97
5997885.27
5997913.62
5997921.10
LENGTH
112.59
36.36 51.35
81.40 28.35
225.42
58.18 END
STATION
506+12.59
506+48.95
507+00.30
507+81.70
508+10.04
510+35.46
510+93.64
DIRECTION/
DELTA
S01°22'05"W
S00°12'49"E
S12°34'58"E
S00°12'49"E
N89°47'11"E
N01°54'07"E
N20°36'14"W
RADIUS
"SAW-2" LINE
SEGMENT ID
L29
L30
L31
START
STATION
402+00.00
402+30.21
402+66.34
START
NORTHING
1983816.52
1983846.72
1983882.85
START
EASTING
5997859.93
5997860.39
5997861.11
LENGTH
30.21 36.13
47.86 END
STATION
402+30.21
402+66.34
403+14.20
DIRECTION/
DELTA
N00°52'46"E
N01°08'24"E
N01°20'44"E
RADIUS
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-5
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
MATCHLINE 54+40
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
KEY LINE GEOMETRY
9 30
74 28
57 55
56 "BW-2" LINE
"SAW-2" LINE
"STO" LINE
"HOL" LINE
"STO-N" LINE
"MED" LINE
"FL" LINE
4 5
304
304+68.32 END
304+38.89 AP
304+62.59 AP
404
404+78.46 END
403+74.39 AP
404+22.36 AP
404+37.77 AP
404+45.38 BC
4 11
12 L26
L27
L28
L32
L33
L34
L35
C15
"BW-2" LINE
SEGMENT ID
L26
L27
L28
START
STATION
302+97.05
304+38.89
304+62.59
START
NORTHING
1983912.80
1984054.61
1984078.03
START
EASTING
5997842.94
5997846.32
5997842.72
LENGTH
141.84
23.70 5.73
END
STATION
304+38.89
304+62.59
304+68.32
DIRECTION/
DELTA
N01°22'05"E
N08°44'31"W
N45°42'20"W
RADIUS
L32
L33
L34
L35
C15
403+14.20
403+74.39
404+22.36
404+37.77
404+45.38
1983930.70
1983990.87
1984038.83
1984054.23
1984053.86
5997862.23
5997863.70
5997864.80
5997865.17
5997857.57
60.19 47.97
15.40 7.61
33.08 403+74.39
404+22.36
404+37.77
404+45.38
404+78.46
N01°24'03"E
N01°18'23"E
N01°22'45"E
S87°15'08"W
009°23'03" 202.00
"SAW-2" LINE
SEGMENT ID START
STATION
START
NORTHING
START
EASTING LENGTH END
STATION
DIRECTION/
DELTA RADIUS
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
K-6
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
MATCHLINE 54+40
KEY LINE GEOMETRY
10 30
75 Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
073-440-016
10" 6" MELA
14" EUC
16" MELA0" 10" 8" MELA
20" SYC
5" 4" OLIVE
6" 5" OLIVE
10" 6" OLIVE
16" SPRUCE
8" 5" OLIVE
14" SPRUCE
32" PINE
9" JAC
(32)
(36)
(33)
(34)
(36)
(32)
34 32
31 48
49 50
1 2
3 4
10+09.23
2.50'RT
10+05.00
2.50'RT
10+09.23
2.50'LT
M
NP
-1.50%
-3.11%
"STO"
41.90' LT "STO" 47+75.00
"BUS" 1+00 =
50.00' LT "STO" 49+02.00
SAWCUT AT EXISTING
JOINT IN BUS POCKET
"BUS" 2+28.32 =
1+00.00
13.01'LT
(38)
(37)
(37)
(36)
(35)
(34)
56.73' LT "STO" 49+72.50
"BUS" 2+97.66 =
-3.32%
-2.92%
-2.08%
140'
-2.41%
-1.50%
-1.50%
8' 10'
O
(33)
(35)
(34)
(33)
36 34
32 33
35 33
37 32
1+14.67
11.23'LT
1+26.96
8.58'LT
10+62.026.50'RT
10+62.026.50'LT
10+19.702.50'RT
10+57.88
2.50'RT
10+19.702.50'LT
10+47.272.50'LT
10+57.88
2.50'LT
I
J
J
JK
PL
SAWCUT"BUS" LINE
10 10
5'
"SW" LINE
TCE
TCE
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
10+00.00
2.50'RT
10+00.00
2.50'LT
10+04.97
2.50'LT
2+96.45
14.04'LT
2+77.88
8.59'LT
1+38.55
8.58'LT
10+47.27
2.50'RT JK
P
-4.80%
-1.50%
NEW UCSB
COM. MH
SEE SHEET C-4 FOR
BUS SHELTER LAYOUT
LAYOUT CONSTRUCTION NOTES:
I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT
J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT
K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER
MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER
SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS
L REMOVE AND DISPOSE OF EXISTING BUS STOP STRUCTURES,
RETAINING WALL AND COMPONENTS, SEE SPECIAL PROVISIONS
M BUS PAD:
REINFORCED CONCRETE, SEE COUNTY OF SANTA BARBARA
STANDARD 5-120 & 5-130
N CURB:
SEE COUNTY OF SANTA BARBARA STANDARD 4-030, TYPE A
O CURB & GUTTER:
SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
3" COLD PLANE &
TEMPORARY OVERLAY
SAWCUT
DAYLIGHT
NEW RIGHT-OF-WAY
TCETCE
R/W
LEGEND:
CONCRETE
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
L-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
LAYOUT
STORKE RD.
MARKETPLACE DR.
11 30
NOTES:
SEE EXISTING UTILITY AND CONFLICT PLANS
REGARDING LANDSCAPING AND IRRIGATION.
RIGHT OF WAY NEGOTIATIONS ARE UNDERWAY. THE
CURRENT CONCEPTS FOR THE TCE'S AND PROPOSED
ROAD RIGHT-OF-WAY ARE SHOWN IN "MAGENTA" LINES.
NOTE REGARDING RIGHT-OF-WAY:
1. FOR COMPLETE RIGHT-OF-WAY INFORMATION SEE
MAPS PREPARED FOR THIS PROJECT IN CITY
OFFICE.
76 P/L
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
073-440-024
073-440-018
Exist R/W
Exist R/W
Exist R/W
073-100-032
6" JAC
5" JAC 5" JAC
5" JAC
12" OLIVE 4" 6" OLIVE 12" PINE
14" SPRUCE
16" SPRUCE 14" PINE
(34)
(35)
(36)
(37)
(38)
(39)
(38)
(37)
(36)
(35)
(34)
(39)
(38)
35 36
37 38
38 39
36 37
37 52
53 54
1 2
3 5+92.49
0.00'T
23.40' LT "STO" 54+30
"MED" 5+00 =
5+74.41
0.00'T
5+58.17
0.00'T
5+38.21
0.00'T
7+74.04
0.00'T
5 6
7 8
9 10
7+87.39
0.00'T
9+17.90
0.00'T
9+56.20
0.00'T
10+01.55
0.00'T
10+38.51
0.00'T
180'
13' 5' 11' 11' 12' VAR. 19' 14'
8'
Q
Q
63.93' LT "STO" 53+00.00
"FL" 2+00 =
3+12.06
0.00'T
3+36.81
0.00'T
"STO"
CI
I I
19.10' LT "STO" 54+30
"MED" 10+62.34 =
(35)
(33)
(36)
(37)
(39)
35 37
2+87.88
5.58'LT
36 I
J
K
-1.50%
-1.41%
-1.48%
-1.49%
-1.70%
-0.24%
-1.74%
-1.35%
-1.78%
-1.80%
-2.79%
-2.41%
-2.85%
-2.39%
-1.78%
-0.70%
51+49.86
17.77'LT
51+50.64
10.57'RT
52+31.23
20.02'LT
52+81.06
32.40'LT
54+30.00
33.40'LT
53+76.05
12.67'RT
54+30.00
9.10'LT
53+00.48
46.72'LT
54+35.33
47.13'LT
R
LANDSCAPE
TO REMAIN
-3.45%
SAWCUT
"MED" LINE
"MED" LINE
SAWCUT
SAWCUT
"FL" LINE
38 36
38 R/W
R/W
R/W
R/W
R/W
R/W
TCE
TCE
TCE
TCE
12'
16'
O
P
2+00.00
5.54'LT
2+60.12
5.58'LT
2+60.12
0.00'T
2+95.38
6.53'LT
2+80.85
0.00'T
2+80.85
5.58'LT
3+00.08
2.58'LT
38 39
PROVIDE 4" PVC SLEEVE
UNDER NEW SIDEWALK
FOR FUTURE IRRIGATION
LAYOUT CONSTRUCTION NOTES:
I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT
J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT
K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER
MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER
SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS
O CURB & GUTTER:
SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
Q MEDIAN CURB:
SEE COUNTY OF SANTA BARBARA STANDARD 4-035
R MEDIAN CONCRETE TREATMENT:
STAMPED CONCRETE; BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.
SAWCUT
STAMPED CONCRETE
BRICK PATTERN
DAYLIGHT
LEGEND:
CONCRETE
PLUG PAVING
SEE TYPICAL SECTIONS
NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
L-2
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
LAYOUT
STORKE RD.
MATCHLINE 54+40
12 30
77 Exist R/W
Exist R/W
Ex
073-440-018
Exist R/W
(40)
(41)
(42)
(43)
(44)
(42)
(41)
(40)
(43)
(42)
(41)
(39)
41 40
39 55
56 28
4 4
11 12
66.05' LT "STO" 55+68.64
"FL" 4+71.82 =
3+97.51
0.00'T
O
P
(40)
I J
-1.50%
-1.50%
-0.77%
54+40.00
47.12'LT
54+96.04
47.13'LT
55+38.24
47.15'LT
R
K
"MED" LINE
"MED" LINE
"FL" LINE
SAWCUT LINE
R/W
R/W
R/W
R/W
R/W
TCE
TCE
R/W
12'
3+47.30
13.60'LT
4+41.98
8.90'LT
4+66.49
6.36'LT
4+71.81
8.92'LT
L S
PROVIDE 4" PVC SLEEVE
UNDER NEW SIDEWALK
FOR FUTURE IRRIGATION
REMOVE CONCRETE
AND BENCHES, LEAVE
EXPOSED FOR FUTURE
LANDSCAPING
LAYOUT CONSTRUCTION NOTES:
I REMOVE EXISTING CURB, BASE AND PAVING AT JOINT OR SAWCUT
J REMOVE EXISTING SIDEWALK AT JOINT OR SAWCUT
K CONTRACTOR TO COORDINATE WITH PROPERTY OWNER
MAINTENANCE TO LEAVE IRRIGATION AND PLANTING IN A MANNER
SUITABLE FOR FUTURE LANDSCAPE AND IRRIGATION BY OTHERS
L REMOVE AND DISPOSE OF EXISTING BUS STOP STRUCTURES,
RETAINING WALL AND COMPONENTS, SEE SPECIAL PROVISIONS
O CURB & GUTTER:
SEE COUNTY OF SANTA BARBARA STANDARD 4-030
P SIDEWALK:
SEE COUNTY OF SANTA BARBARA STANDARDS 5-010 & 5-040
AT BUS PAD SIDEWALK IS 8' IN WIDTH
R MEDIAN CONCRETE TREATMENT:
STAMPED CONCRETE; BRICK PATTERN, BRICK COLOR; MATCH
MEDIAN NORTH OF HOLLISTER AVE.
S RECONSTRUCT BRICK PAVERS AS NECESSARY TO MATCH NEW
SIDEWALK
SAWCUT
STAMPED CONCRETE
BRICK PATTERN
DAYLIGHT
LEGEND:
CONCRETE
PLUG PAVING
SEE TYPICAL SECTIONS
NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
L-3
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
LAYOUT
STORKE RD.
MATCHLINE 54+40
HOLLISTER AVE.
13 30
78 10
20 30
40 50
60 10
20 30
40 50
60 PG
(OG)
(30.6)
30.49 (32.9)
30.79 (31.3)
31.09 121+00
30.49 2+28.32
31.26 0.60%
OG PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(34.9)
34.93 (38.0)
36.23 (38.3)
37.41 (38.6)
38.67 (39.8)
39.86 (40.9)
40.91 23452+00
34.93 2+25
35.78 2+60.12
36.41 3+36.81
38.33 3+75
39.323+97.51
39.81 4+71.81
41.37 2.10%
3.40%
1.80%
2.15%
2.60%
2.50%
OG
PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(34.9)
34.67 (35.6)
35.29 (36.1)
36.09 (37.1)
37.25 (38.2)
38.60 (39.3)
39.54 8 9 10 11
10+62.34
39.76 7+87.39
34.55 10+38.51
39.34 8+25
34.89 9+17.90
36.38 10+01.55
38.64 1.76%
1.90%
0.90%
1.60%
2.70%
OG
PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(38.9)
38.93 (38.2)
38.03 (37.4)
37.13 (36.3)
36.23 (35.5)
35.23 (34.8)
34.53 56785+00
38.93 7+80.72
34.317+87.39
34.55 7+00
35.23 7+74.04
34.19 6+50
36.23 1.70%
3.70%
-2.00%
-1.40%
-1.80%
OG
PG
20 30
40 50
60 70
20 30
40 50
60 70
PG
(OG)
(34.2)
34.17 (35.0)
32.07 91 0 10
10+00
34.17 10+05
34.09 10+09.23
33.94 10+19.70
33.49 10+47.27
32.16 10+57.88
31.82 10+62.02
31.77 -1.50%
-3.64%
-4.32%
-4.80%
-3.24%
-1.26%
OG
PG
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
P-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
STORKE ROAD
SCALE H: 1" = 20'
V: 1" = 20'
00 20' 40'
PROFILES
"BUS" PROFILE "FL" PROFILE
"MED" PROFILE
"MED" PROFILE
14 30
"SW" PROFILE
STORKE ROAD
SCALE H: 1" = 10'
V: 1" = 10'
00 10' 20'
79 TCE
TCE
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
TCE
R/W
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
073-440-016
48 49
50 "STO"
31.16 TC
30.66 FS
48+02.94 48.21'L
= 1+29.03 "BUS"
31.74 FS
1+00.00
13.01'L
30.94 FS
47+75.00
34.68'L
30.99 TC
30.49 FS
47+75.00 41.90'L
= 1+00.00 "BUS"
31.03 TC
30.53 FS
47+82.36 41.91'L
= 1+07.36 "BUS"
31.09 FS
47+97.29
34.57'L
31.32 FS
48+35.94
34.15'L
31.59 FS
48+71.39
34.71'L
31.75 FS
49+02.00
35.28'L
31.09 TC
30.59 FS
47+91.64 43.69'L
= 1+16.87 "BUS"
31.22 TC
30.72 FS
48+12.22 50.00'L
= 1+38.55 "BUS"
31.76 TC
31.26 FS
49+02.00 50.00'L
= 2+28.32 "BUS"
31.38 FS
1+14.67 BC
11.23'L
31.27 FS
1+26.96 EC
8.58'L
31.28 FS
1+29.03 BC
8.58'L
31.34 FS
1+38.55 EC
8.58'L
31.73 FS
10+62.02 EC
6.50'R 31.81
FS
10+62.02 EC
6.50'L
32.19 FS
2+77.88 AP
8.59'L
32.59 FS
2+87.04 AP
11.25'L
33.03 FS
2+96.45
14.04'L
31.59 FS
1+00.00
7.00'L
31.18 FS
1+18.89
3.23'L
32.20 FS
10+47.27 BC
2.50'L
31.84 FS
10+57.88 EC
2.50'L
31.84 FS
10+58.02 BC
2.50'L
31.79 FS
10+58.02 BC
2.50'R
31.79 FS
10+57.88 EC
2.50'R
32.13 FS
10+47.27 BC
2.50'R
33.45 FS
10+19.70 EC
2.50'R
33.98 FS
10+09.23 BC
2.50'R
34.11 FS
10+05.00
2.50'R
34.19 FS
10+00.00
2.50'R
33.52 FS
10+19.70 EC
2.50'L
33.90 FS
10+09.23 BC
2.50'L
34.07 FS
10+04.97
2.50'L
34.14 FS
10+00.00
2.50'L
-1.50%
-3.00%
-3.32%
-2.92%
-2.08%
-2.41%
-1.50%
-1.50%
-4.80%
-0.60%
-0.60%
-1.00%
32.07 TC
31.57 FS
49+52.23 49.98'L
= 2+78.55 "BUS"
31.59 FS
1+05.00 AP
12.38'L
32.12 FS
2+78.50
2.71'L
32.53 FS
2+88.50
5.63'L
32.91 FS
2+97.66
8.30'L
"SW" LINE
1 2
3 4
10 "BUS" LINE
"STO" LINE
-1.50%
NEW UCSB
COM. MH
31.59 TC
31.09 FS
48+73.68 50.00'L
= 2+00.00 "BUS"
3" COLD PLANE &
TEMPORARY OVERLAY
SAWCUT
DAYLIGHT
NEW RIGHT-OF-WAY
TCETCE
R/W
LEGEND:
CONCRETE
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
CONSTRUCTION DETAILS
STORKE RD.
MARKETPLACE DR.
15 30
NOTE:
DOWEL INTO EXISTING BUS PAD PAVEMENT.
SEE CALTRANS STANDARD PLAN P10,
"TRANSVERSE CONSTRUCTION JOINT FOR
EXISTING CONCRETE PAVEMENT" DETAIL.
80 R/W
R/W
R/W
R/W
TCE
TCE
P/L
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
073-440-024
073-440-018
Exist R/W
Exist R/W
Exist R/W
073-100-032
52 53
54 "STO"
-4.30%
-1.50%
-1.40%
-1.50%
-1.50%
-1.60%
-0.40%
-1.70%
-1.50%
-1.75%
-1.80%
-2.80%
-2.40%
-2.80%
-2.40%
-1.80%
-0.70%
35.57 FS
2+00.00
6.11'L
35.43 TC
34.93 FS
53+00.00 63.97'L
= 2+00.00 "FL"
35.68 FS
2+05.00 AP
5.58'L
36.99 FS
2+60.12 BC
5.58'L
37.51 FS
2+80.85 EC
5.58'L
37.68 FS
2+87.88 BC
5.58'L
37.91 FS
2+95.38 EC
6.53'L
38.02 FS
2+98.83
7.42'L
37.94 FS
3+00.08
2.58'L
37.43 TC
36.93 FS
53+80.62 63.31'L
= 2+80.85 "FL"
38.83 TC
38.33 FS
54+35.33 52.40'L
= 3+36.81 "FL"
36.91 TC
36.41 FS
53+60.09 65.63'L
= 2+60.12 "FL"
-1.90%-1.80%
-2.48%
33.93 FS
51+49.86
17.77'L
35.04 FS
52+31.23
20.02'L
35.83 FS
52+81.06
32.40'L
36.53 FS
53+17.41
33.40'L
38.94 FS
54+30.00
33.40'L
35.79 FS
53+00.48
46.72'L
34.32 FS
51+50.64
10.57'R
38.19 FS
53+76.05
12.67'R
39.60 FS
54+30.00
9.10'L
36.94 FS
53+66.81
47.12'L
38.21 TC
37.71 FS
54+10.84 55.51'L
= 3+12.06 "FL"
37.98 FS
54+14.68
47.14'L
40.26 TC
39.76 FS
54+30.00 19.10'L
= 10+62.34 "MED"
39.84 TC
39.34 FS
54+06.17 19.10'L
= 10+38.51 "MED"
39.14 TC
38.64 FS
53+69.61 14.38'L
= 10+01.55 "MED"
37.91 TC
37.41 FS
53+25.75 2.87'L
= 9+56.20 "MED"
36.88 TC
36.38 FS
52+87.85 1.84'R
= 9+17.90 "MED"
35.05 TC
34.55 FS
51+57.35 0.63'R
= 7+87.39 "MED"
34.69 TC
34.19 FS
51+57.27 7.97'L
= 7+74.04 "MED"
37.77 TC
37.27 FS
53+38.75 12.98'L
= 5+92.49 "MED"
38.09 TC
37.59 FS
53+56.55 15.84'L
= 5+74.41 "MED"
38.38 TC
37.88 FS
53+72.10 20.51'L
= 5+58.17 "MED"
38.74 TC
38.24 FS
53+91.79 23.40'L
= 5+38.21 "MED"
36.25 FS
53+30.68
46.98'L
36.28 TC
35.78 FS
53+24.98 64.66'L
= 2+25.00 "FL"
36.73 TC
36.23 FS
52+81.26 11.39'L
= 6+50.00 "MED"
35.73 TC
35.23 FS
52+31.28 10.01'L
= 7+00.00 "MED"
34.81 TC
34.31 FS
51+53.09 3.63'L
= 7+80.72 "MED"
35.39 TC
34.89 FS
51+94.96 0.98'R
= 8+25.00 "MED"
5 67
8 9
10 1
2 3
"STO" LINE
"MED" LINE
"MED" LINE
"FL" LINE
39.43 TC
38.93 FS
54+30.00 23.40'L
= 5+00.00 "MED"
SAWCUT
STAMPED CONCRETE
BRICK PATTERN
DAYLIGHT
LEGEND:
CONCRETE
PLUG PAVING
SEE TYPICAL SECTIONS
NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-2
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
CONSTRUCTION DETAILS
STORKE RD.
MATCHLINE 54+40
16 30
81 R/W
R/W
R/W
R/W
TCE
TCE
R/W
Exist R/W
Exist R/W
Ex
073-440-018
Exist R/W
55 56
28 -1.50%
-1.50%
-0.77%
39.16 FS
3+47.30
13.60'L
39.08 FS
3+47.30
8.60'L
41.31 FS
4+41.98 AP
8.90'L
41.82 FS
4+66.49 AP
6.36'L
42.08 FS
4+71.82
8.92'L
41.35 FS
4+47.03
2.58'L
40.31 TC
39.81 FS
54+96.03 52.40'L
= 3+97.51 "FL"
41.89 TC
41.39 FS
55+68.64 66.05'L
= 4+71.82 "FL"
39.50 FS
54+74.87
47.10'L
40.53 FS
55+22.84
47.15'L
40.87 FS
55+38.24
47.15'L
40.68 FS
55+37.69
54.74'L
41.47 FS
55+69.37
64.18'L
-2.26%
3 4
11 12
4 5
39.82 TC
39.32 FS
54+73.52 52.40'L
= 3+75.00 "FL"
"MED" LINE
"STO" LINE
"FL" LINE
"MED" LINE
SAWCUT
STAMPED CONCRETE
BRICK PATTERN
DAYLIGHT
LEGEND:
CONCRETE
PLUG PAVING
SEE TYPICAL SECTIONS
NEW RIGHT-OF-WAY
TCETCE
R/W
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-3
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
CONSTRUCTION DETAILS
STORKE RD.
MATCHLINE 54+40
HOLLISTER AVE.
17 30
82 TCE
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
TCE
R/W
R/W
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EXISTING BUS PAD
NEW BUS PAD
11'5'10'8'
LANE LINES
TRASH
CAN
EXISTING CURB
NEW CURB
REMOVE
EXISTING WALL
2 V Y
2'
15'
3'
6'
3'
9'
3'
3'
6' 2'
2'
4' 5'
3'
NEW
SIDEWALK
6'x2' BENCH
6'x2' BENCH
8'
FRONT BUS
POCKET
TANGENT
POINT
2'
LNI BUS SHELTER
RELOCATE
EXISTING SIGN
NEW LOCATION OF
EXISTING SIGN
31.22 TC
30.72 FS
1+38.55
0.00 T "BUS" LINE
REMOVE
EXISTING
SIDEWALK
31.34 FS
1+38.55 EC
8.58'L
NEW UCSB
COM. MH
BUS SHELTER NOTES:
V CONSTRUCT NEW MTD BUS SHELTER BY LNI CUSTOM
MANUFACTURING, INC. THE 15' STRUCTURE WITH FOOTINGS AND
ANCHORS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
Y REMOVE AND DISPOSE OF EXITING BENCHES AND TRASH CANS
AND REPLACE WITH NEW BENCHES AND TRASH CANS PER MTD
STANDARDS.
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-4
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 5'
00 10' 20'
CONSTRUCTION DETAILS
STORKE RD.
18 30
83 R/W R/W R/W R/W R/W
R/W R/W R/WR/W
E
E
E
E
E
E
EASE EASE
073-100-033
7"/8" JACARANDA
18" PINE
2" JACARANDA
3" & 4" JACARANDA
5" JACARANDA
6" & 7" JACARANDA
BUS SHELTER
(E) BUS PAD
(E) LANE LINES
(E) SEWER MANHOLE
(E) CURB & GUTTER
8'11'12'
(E) STREET LIGHT
(E) BACK FLOW PREVENTER
(E) TELEPHONE POLE
T
UVU V
W W
X
YY
Y
Y
Y Y
(E) LANE LINE
(E) DRIVEWAY
(E) DRIVEWAY
(E) WATER VALVES
BUS SHELTER NOTES:
T DEMOLISH EXISTING WOOD BUS SHELTER
U REMOVE 8" X 8" SUPPORT POSTS AND FOOTINGS
V CONSTRUCT NEW MTD BUS SHELTER BY LNI CUSTOM
MANUFACTURING, INC. THE 15' STRUCTURE WITH FOOTINGS AND
ANCHORS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
W REPAIR SIDEWALK WHERE POSTS AND FOOTINGS WERE LOCATED
AND MATCH ADJACENT GRADES WITH NEW CONCRETE
X PROTECT HARDSCAPE, FEATURES TO REMAIN.
Y REMOVE AND DISPOSE OF EXITING BENCHES AND TRASH CANS
AND REPLACE WITH NEW BENCHES AND TRASH CANS PER MTD
STANDARDS.
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
C-5
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 5'
00 10' 20'
CONSTRUCTION DETAILS
HOLLISTER AVE
19 30
84 APWA
Utility Color Code
Red = Electric
Yellow = Gas-Oil-Steam
Orange = Communication and TV
Blue = Potable Water Lines
Green = Sewer Lines
Purple = Reclaimed Water Lines
GENERAL NOTES FOR EXISTING UTILITIES:
1. THESE PLANS SHOW THE APPROXIMATE
LOCATION OF EXISTING UTILITIES AND
THE ANTICIPATED UTILITY CONFLICTS
FOR THE PROJECT.
2. UTILITIES SHOWN AS MARKED BY DIG
ALERT DURING MARCH 2022 AND AS
SHOWN ON AVAILABLE RECORD
DRAWINGS.
3. PRIVATE CONNECTIONS TO PARKING LOT
LIGHTING IS UNKNOWN.
4. EXISTING UTILITIES NOT OTHERWISE
MARKED FOR ADJUSTMENT SHALL BE
PROTECTED IN PLACE.
5. RECORD DRAWINGS FOR WYNMARK
SHOW A 48" DIAMETER HDPE STORM
DRAIN ALONG THE WEST SIDE OF
STORKE ROAD. THEY WYNMARK PLANS
DO NOT MATCH THE STORM DRAIN
CONFIGURATION IN THE FIELD. UCSB
FIBER PLANS SHOW DIFFERENT STORM
DRAIN CONFIGURATION WHICH APPEARS
TO MATCH THE FIELD. THE STORM DRAIN
WAS NOT POTHOLED SO THE EXACT
CONFIGURATION IS UNKNOWN.
6. WYNMARK PLANS ALSO SHOW A FIRE
LINE ALONG THE WEST SIDE OF STORKE
ROAD NEAR THE HOME DEPOT BUILDING.
THE FIRE LINE WAS NOT MARKED BY "DIG
ALERT", EXACT CONFIGURATION IS
UNKNOWN.
7. PRIVATE IRRIGATION SYSTEMS EXIST
WEST OF THE SIDEWALK ALONG STORKE
ROAD AND IN THE PLANTED MEDIAN ON
STORKE ROAD. THE CONFIGURATION OF
THESE SYSTEMS IS UNKNOWN; NO
RECORD DRAWINGS WERE AVAILABLE
DURING DESIGN. THESE SYSTEMS
INCLUDE ELECTRICAL CONTROLS,
SPRINKLER HEADS, SUPPLY LINES AND
OTHER COMPONENTS.
8. CONTRACTOR SHALL COORDINATE WITH
ALL UTILITIES PER SPECIAL PROVISIONS.
GENERAL NOTES FOR UTILITY CONFLICTS:
1. WATER VALVES AND MANHOLE FRAMES
AND COVERS EXIST IN CITY STREET.
THESE WILL BE ADJUSTED TO GRADE
WITH THE "MAINLINE PAVEMENT
RECONSTRUCTION PROJECT" DESIGN BY
PAVEMENT ENGINEERING INC.
2. TRAFFIC LOOPS AND DETECTOR HAND
HOLES EXIST IN PAVEMENT, THESE WILL
BE AFFECTED BY "MAINLINE PAVEMENT
RECONSTRUCTION PROJECT". SEE
SPECIAL PROVISIONS REGARDING
RECONSTRUCTION OF TRAFFIC SIGNAL
COMPONENTS.
3. SIGNAL INTERCONNECT EXIST UNDER
THE SIDEWALK ON THE WEST SIDE OF
STORKE ROAD. THE CONDUITS ARE ~24"
BELOW EXISTING GRADE. THE
CONTRACTOR SHALL PERFORM
RELOCATION/LOWERING AS NECESSARY
AND COORDINATE WITH CITY TRAFFIC
ENGINEER TWO WEEKS PRIOR TO WORK
IMPACTING CONDUITS.
4. PRIVATE IRRIGATION SYSTEMS EXIST
WEST OF THE SIDEWALK ALONG STORKE
ROAD AND IN THE PLANTED MEDIAN ON
STORKE ROAD. THE CONFIGURATION OF
THESE SYSTEMS IS UNKNOWN;
CONTRACTOR TO POTHOLE, MARK, AND
CAP THESE SYSTEMS SO THE OWNER
CAN RECONSTRUCT THE LANDSCAPING
AND IRRIGATION SYSTEMS AFTER THE
PUBLIC WORKS CONTRACT IS COMPLETE.
5. CONTRACTOR SHALL COORDINATE WITH
ALL UTILITIES PER SPECIAL PROVISIONS.
6. SEE SPECIAL PROVISIONS FOR
CONTRACT TIME ALLOWANCES FOR
UTILITY WORK PERFORMED BY OTHERS.
7. CONTRACTOR TO PROVIDE POTHOLING
REPORT. SEE SPECIAL PROVISIONS.
COORDINATE WITH RESIDENT ENGINEER.
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
EXISTING UTILITY AND
CONFLICT PLAN
SOUTH STORKE
HWY 101
HOLLISTER AVE
PHELPS RD
HOME
DEPOT
ANGELES
LOS
FRANCISCO
SAN
SANTA BARBARA COUNTY
BARBARA
SANTA
LOMPOC
SANTA MARIA
No Scale
VICINITY MAP
20 30
UTILITY CONTACT INFORMATION
CITY OF GOLETA:
Contact: Melissa Angeles
(805) 690-5122
GOLETA WATER DISTRICT
Contact: Richard Armstrong
(805) 964-6761
GOLETA WEST SANITARY DISTRICT
Contact: Joey Hilliard
(805) 681-3910
COX COMMUNICATIONS
Contact: Jose Murillo
(805) 681-3910
SCE TRANSMISSION
Contact: Buster Brown
(805) 490-5293
SCE DISTRIBUTION
Contact: Shawn Lee
(805) 535-5901
SCE TRANSMISSION TELECOM
Contact: Mike Payne
(661) 294-1511
SCG TRANSMISSION
Contact: John Cardilino
(805) 681-7968
SCG DISTRIBUTION
Contact: Karl Monteleone
(805) 681-7945
UCSB
Contact: John Loman
(805) 893-3399
FRONTIER
Contact: Lad Kuzela
(805) 964-8303
CROWN CASTLE
Contact: Michael Moats
(949) 936-0043
PROJECT LIMITS
GOLETA
85 W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
SD SD SD
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
G
G G G
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
CTV
CTV
CTV
CTV
CTV
CTV
E
E E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
T
T
T
T
T
T T T T T
T
T T
T
T
T
T
G G G
G
W
W
W
W
W
W
W
48 49
50 TELEPHONE MANHOLE
ELECTRICAL CONNECTIONS
TO LIGHTS UNKNOWN
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
073-440-016
10" 6" MELA
14" EUC
16" MELA10" 10" 8" MELA
24" SYC
18" PINE 20" SYC
5" 4" OLIVE
6" 5" OLIVE
10" 6" OLIVE
16" SPRUCE
8" 5" OLIVE
14" SPRUCE
32" PINE
9" JAC
16 6
5 3
4 DRAINAGE
EASEMENT
TOP OF
CUT SLOPE
2 HOME DEPOT
A
A
21 22
UTILITY INFRASTRUCTURE IN CONFLICT:
UCSB VAULT
TELEPHONE/COMMUNICATION LINE
CABLE TV LINE
IRRIGATION BOX
1 2
3 4
TELEPHONE/COMMUNICATION LINE
ELECTRICAL LINE
5 6
UTILITY CONFLICT NOTES
STORM DRAIN
FIRE LINE
21 22
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-2
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
MATCHLINE 50+50
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
STORKE RD.
ATTENTION ROADWAY CONTRACTOR
SEE GENERAL NOTES FOR UTILITY
CONFLICTS REGARDING LANDSCAPING
AND SPRINKLERS
1 UCSB TO REPLACE VAULT WITH A
TRAFFIC-RATED MH AT THIS LOCATION
DURING CONSTRUCTION.
2, 3, 6
PROTECT UNDERGROUND UTILITIES.
DEPTHS ARE UNKNOWN.
21 30EXISTING UTILITY AND
CONFLICT PLAN
21 PROTECT EXISTING STORM DRAIN.
22 PROTECT EXISTING FIRE LINE.
4 CAP AND MARK IRRIGATION. SEE
GENERAL NOTES FOR UTILITY
CONFLICTS.
5 PROTECT UNDERGROUND UTILITIES.
DEPTHS ARE UNKNOWN.
86 S S S
W W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S S S S S
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
G G G G
G G
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
W
W
E
S
S
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
E
E
E
E
E
E
E
E
E E
E
E
T
T
T
T
T
T
T
T
T
T
T
T T T T
T
T
T
T
T
T
TR
G G G G G G
G
G
G
G G
G
G
G
G
G
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
51 52
53P/L
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
EASE
073-440-024
073-440-018
R/W
R/W
R/W
R/W
R/W
073 100 032
6" JAC
5" JAC 5" JAC
5" JAC
12" OLIVE 4" 6" OLIVE 12" PINE
14" SPRUCE
10 7
8 9
JANE AT THE
MARKETPLACE
23 CONFIGURATION OF STORM
DRAIN LATERAL TO D.I. IS
UNKNOWN.
McDONALDS
ROADWAY CONTRACTOR:
PROTECT GREASE TRAPS
AND UNDERGROUND
UTILITIES FOR McDONALDS.
DETAILS ARE NOT SHOWN
BECAUSE THIS IS OUTSIDE
THE FOOTPRINT OF THE
WORK.
TOP OF
CUT SLOPE
11 99
12 151413
B
B
NOT ALL UTILITIES EAST OF
PROPOSED WORK ARE SHOWN
AS THEY ARE OUTSIDE THE SCOPE
OF THE PROJECT.
24 WATER METERS
25 UTILITY INFRASTRUCTURE IN CONFLICT:
IRRIGATION BOX
TRAFFIC SIGNAL BOX
BACKFLOW PREVENTER
WATER VAULT
WATER METERS
7 8
9 10
11 UTILITY CONFLICT NOTES
TRANSFORMER PAD AND
UNDERGROUND ELECTRIC
TELEPHONE/COMMUNICATION LINE
CABLE TV LINE
ELECTRICAL LINE
12 13
14 15
TRAFFIC SIGNAL CONTROL
TRAFFIC SIGNAL INTERCONNECT
MANHOLE
23 24
25 SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-3
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
MATCHLINE 50+50
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'MATCHLINE 53+50
STORKE RD.
MARKETPLACE DR.
13, 14, 15
PROTECT UNDERGROUND UTILITIES. DEPTHS UNKNOWN.
SCE: (TRANSMISSION OR DISTRIBUTION)
23 TRAFFIC SIGNAL CONTROL WILL BE CHANGED TO
"AUTO SCOPE" BY OTHERS. EXISTING TRAFFIC LOOPS
WILL BE ABANDONED BY MAINLINE PAVING.
24 PROTECT OR LOWER SIGNAL INTERCONNECT. SEE
GENERAL NOTES FOR UTILITY CONFLICTS.
25 GWSD
PROTECT EXISTING MANHOLE RING AND STRUCTURE.
8 TRAFFIC SIGNAL BOX: ROADWAY CONTRACTOR
REST TO GRADE OF NEW SIDEWALK
9 WYNMARK:
RELOCATE BACKFLOW DEVICES CLEAR OF
GRADING.
10 GOLETA WATER DISTRICT: CURRENT VAULT
IN STREET, RELOCATE WATER VAULT TO FIT
WITHIN EXTENDED SIDEWALK
11 PROTECT WATER METERS.
12 SCE: TRANSFORMER PADS CLEAR OF
GRADING. DEPTH OF UNDERGROUND
SWEEP FROM STREET UNKNOWN.
22 30EXISTING UTILITY AND
CONFLICT PLAN
7 RECONSTRUCT MEDIAN IRRIGATION
SYSTEM. SEE GENERAL NOTES FOR
UTILITY CONFLICTS ON SHEET UC-1.
87 S S
S S S
SD
SD
SD
G G G G
T
T
T
T
T
T
T
E
E E E E E
E
W
E
E
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
TR
TR
TR
TR
TR
TR
TR
TR
TR
S
T
T T T T
T T T T T
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W
E
E
E
TR
TR
TR
TR
TR
TR
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
TR
TR
TR
TR
TR
TR
TR
TR
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
S
S
S
S
S
S
S
S
S
S
S
TR
TR
TR
G G G G G G G G G G G
G G
G
G
G
G G G G G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
UCSB
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E E
G
G
G
G
G
G
G
G
G
G
G
G
G
G G G G G G
G
TR
TR
TR
TR
TR
54 55
56 28 29
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
EASE
073-440-018
R/W
R/W
R/W
R/W
16" SPRUCE 14" PINE
19 17
18 20
16 NOT ALL UTILITIES EAST OF
PROPOSED WORK ARE SHOWN
AS THEY ARE OUTSIDE THE SCOPE
OF THE PROJECT.
23 TOP OF
CUT SLOPE JANE AT THE
MARKETPLACE
151413
UTILITY COMPANIES
NOTE THAT ROADWAY CONTRACTOR
WILL REMOVE BUS SHELTER.
C
C
D
D
24 UTILITY INFRASTRUCTURE IN CONFLICT:
TELEPHONE/COMMUNICATION LINE
CABLE TV LINE
ELECTRICAL LINE
STREET LIGHT
CABLE TV PEDESTAL
13 14
15 16
17 UTILITY CONFLICT NOTES
CABLE TV VAULT
TRAFFIC SIGNAL BOX
ELECTRICAL MANHOLE COVER
18 19
20 TRAFFIC SIGNAL CONTROL
TRAFFIC SIGNAL INTERCONNECT
23 24
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-4
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
MATCHLINE 53+50
NORTH
STORKE ROAD
SCALE 1" = 10'
00 10' 20'
STORKE RD.
HOLLISTER AVE.
13, 14, 15
PROTECT UNDERGROUND UTILITIES.
DEPTHS UNKNOWN.
16 RELOCATE EXISTING STREET LIGHT
TO STORKE STATION 54+40.
MODIFY ELECTRICAL SERVICE AS NECESSARY
FOR NEW LOCATION.
SET FACE OF POLE 2-FEET BEHIND TOP OF CURB.
17, 18
COX CABLE TO RELOCATE
CTV PEDESTAL 2' BEHIND NEW
BACK OF WALK AND CTV VAULT
3' BEHIND NEW BACK OF CURB.
19 ROTATE AND RESET SIGNAL BOX
TO NEW GRADE.
20 SCE TO RESET MANHOLE FRAME AND COVER TO MATCH NEW GUTTER. 23 TRAFFIC SIGNAL CONTROL WILL BE CHANGED TO "AUTO SCOPE" BY OTHERS.
EXISTING TRAFFIC LOOPS WILL BE ABANDONED BY MAINLINE PAVING. 24 PROTECT OR LOWER SIGNAL INTERCONNECT. SEE GENERAL NOTES FOR UTILITY CONFLICTS.
23 30EXISTING UTILITY AND
CONFLICT PLAN
88 S
G
G
MW
TSPB
TSPB E
E
E
TT
T
E
E
E
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
E
RWRWRWRWRW
TRTR
TR
TR
TR
RW
RW
S
S S
T
T
T
T
T
T
WWW
W
W W W W W W
E
EE
E E
E E E E
E
TR
TR
TR
EEEEEEE
E
TRTRTR
SD
SD
SD
SD
SDSD
SD
SD
SSSS
TR
TRTR
TR
TR
TR
TR
SD
E
TSPB
G
G
G G G G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
GGG
G
G G
G
G
UCSBUCSB
CTV
CTV
CTV CTV
E
E
E
T
T
TT
GGG
G
G
G
5556
28 29 30
31 32 33
R/WR/W
R/W
EASE
073-440-018
R/W
073-100-024
073-140-004
R/W R/W
R/W R/W
EASE EASE
R/W
E
R/W
EASE EASE
073-100-033
073-100-025 073-100-033
20 NOT ALL UTILITIES EAST OF
PROPOSED WORK ARE SHOWN
AS THEY ARE OUTSIDE THE SCOPE
OF THE PROJECT.
JANE AT THE
MARKETPLACE
UTILITY COMPANIES
OTE THAT ROADWAY CONTRACTOR
WILL REMOVE BUS SHELTER.
D
D
24 SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-5
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
24 30EXISTING UTILITY AND
CONFLICT PLAN
NORTH
STORKE ROAD
SCALE 1" = 20'
00 10' 20'
STORKE RD.
HOLLISTER AVE.
INTERESTED ONLY INSIDE OF THIS AREA
89 48+65
"STO" LINE
20 22
24 26
28 30
32 34
36 38
40 02 0 4 00-20-40-60-80-100
CL
RW
T
GT
SD
UCSB
G
E
CTV
T
T
W
S
W
FG
OG
R/W
20 22
24 26
28 30
32 34
36 38
40 53+15
"STO" LINE
20 22
24 26
28 30
32 34
36 38
40 42
44 46
48 50
02 0 4 00-20-40-60-80-100
T
G
UCSB
SD
E
TCTV
G
TR
S
W
CLR/W
RW
FGOG
20 22
24 26
28 30
32 34
36 38
40 42
44 46
48 50
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-6
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
UTILITY CROSS SECTIONS
SECTION A-A
SCALE: 1"=5'
SECTION B-B
SCALE: 1"=5'
25 30
STORKE ROAD
SCALE H: 1" = 5'
V: 1" = 5'
005 ' 1 0'
NOTES:
1. THESE UTILITY CROSS SECTIONS SHOW THE LAYOUT OF THE UNDERGROUND UTILITIES AS MARKED IN THE FIELD BY "DIG ALERT" IN MARCH 2022, AND AS BELIEVED TO BE LAYED-OUT ACCORDING TO AVAILABLE RECORD DRAWINGS.
2. WITH THE EXCEPTION OF THE STORM DRAIN, WHICH IS SHOWN AT APPROXIMATE DEPTH BASED ON FIELD MEASUREMENTS AT MANHOLES, THE DEPTH OF THE OTHER UTILITIES IS UNKNOWN.
3. SEE "SPECIAL PROVISIONS" REGARDING REQUIREMENTS FOR THE CONTRACTORS "POT HOLING REPORT". 90 54+15
"STO" LINE
30 32
34 36
38 40
42 44
46 48
50 02 0 4 00-20-40-60-80-100
T
UCSB
E
ET
CTV
CTV
T
CTV
TR
G
E
S
W
RW R/WCL
G
FG
OG
R/W
30 32
34 36
38 40
42 44
46 48
50 55+00
"STO" LINE
30 32
34 36
38 40
42 44
46 48
50 02 0 4 00-20-40-60-80-100
T
G
CTVET
SD
T
E
TR
G
S
W
RW R/WCL
FGOG
R/W
30 32
34 36
38 40
42 44
46 48
50 SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
UC-7
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
UTILITY CROSS SECTIONS
SECTION C-C
SCALE: 1"=5'
SECTION D-D
SCALE: 1"=5'
26 30
STORKE ROAD
SCALE H: 1" = 5'
V: 1" = 5'
005 ' 1 0'
91 26 27 28 29 30
8'
12'
12'
12'
15'
11'
11' 11'
11'
12'
19'
14'
12'
12'
12'
11'
11'
11'
13'
12 1
12'
12'
5'
46 47
48 49
50 51
52 53
54 55
56 5'
6'
5'
R3-7R
R3-7R
R26
R81
R6-1
SIGN TO
REMAIN
R4-7 & OM2-1H
SIGNS TO
REMAIN
R4-7, OM2-1H
& R9-3
SIGNS TO
REMAIN
CUSTOM
SIGNS TO
REMAIN
13'
L=190'L=190'L=190'
L=190'
L=50'
L=170'
L=50'L=65'
L=65'
L=50'L=210'L=210'L=180'L=50'L=275'L=275'
XX TRAFFIC STRIPE DETAIL NUMBER
839A3938A3938A839A38A39
139 8 39A 138A 8 838A
38A
39 13'
39A 40
39A 8
L=76' L=80'L=70'L=83'
L=73' L=180'
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
PD-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
STORKE RD.
HOLLISTER AVE
MARKETPLACE DR.
PAVEMENT DELINEATION
AND SIGN PLAN
NORTH
STORKE ROAD
SCALE 1" = 40'
00 40' 80'
27 30
SEE "PAVEMENT ENGINEERING INC."
PLANS FOR MAINLINE STRIPING
NOTES:
1. LOCATION OF SIGNS ARE APPROXIMATE AND MAY BE MOVED IN THE FIELD TO ACCOMMODATE OBSTRUCTION.
2. CROSSWALKS PER CALTRANS STANDARD A24F, BASIC. WIDTH 10' AND LINE THICKNESS 1'.
3. ALL STRIPING AND PAVEMENT MARKING DETAILS AND LAYOUTS SHALL CONFORM TO THE
CURRENT STATE OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA
MUTCD), THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS AND THE STATE OF CALIFORNIA STANDARD PLANS, UNLESS OTHERWISE SPECIFIED.
4. LANE DIMENSIONS ARE FROM TOP OF CURB OR EDGE OF PAVEMENT TO CENTER OF STRIPE DETAIL.
5. ALL LONG LINE STRIPING SHALL BE PAINT.
6. ALL PAVEMENT MARKINGS, CROSSWALKS, AND LIMIT LINES SHALL BE THERMOPLASTIC.
7. FOR OTHER STRIPING AND MARKING NOT ASSIGNED A DETAIL NO. IN THE CA MUTCD, INSTALLATIONS ARE INDICATED BY SOLID LINES OR FILLED SHAPES. 92 48
49 50
51 52
53 54
55 56
27 28
"STO"
1 2
3 4
0 1
2 3
4 5
3 4
5 6
7 8
9 10
11 12
"BUS"
"FL"
"MED"
10 "SW" DAYLIGHT
DAYLIGHT
BASE, PAVING & HARDSCAPE - SUMMARY OF QUANTITIES
CONCRETE /
MEDIAN STAMPED CONCRETE ASPHALT CONCRETE COLD PLANE SIDEWALK CURB & GUTTER CURB / MEDIAN CLASS II AGG BASE CLASS IV AGG BASE HARDSCAPE
REMOVAL
SF FT CY SF FT CY TN SF FT CY SF FT CY FT SF CY FT SF CY SF FT CY SF FT CY SF
DESCRIPTION STATIONING
BUS PAD EXTENSION "BUS" STA 1+00 TO 2+98 1075.50 0.67 26.69 688.19 0.25 6.37 11.87 688.19 0.25 1075.50 1.50 59.75 1866.54 1507.81 0.33 18.43 7.36 2.00 0.55 120.96 0.66 2.96 1596.37 0.50 29.56 "SW" STA 10+00 TO 10+62.02 316.95 0.33 3.87 316.95 0.50 5.87 RIGHT TURN EXTENSION "FL" STA 2+00 TO 4+72 2083.38 0.63 48.23 89.85 1463.61 0.33 17.89 271.81 2.00 20.14 4226.52 1.50 234.81 3010.27 MEDIAN MODIFICATIONS "MED" STA 5+00 TO 10+62.34 1312.85 0.33 16.05 8014.18 0.63 185.51 345.61 562.34 0.66 13.74 8340.34 1.50 463.35 1312.85 0.33 16.05 392.43
SUMMARY
SUBTOTAL 2,388 43 10,098 234 447 688 3,288 40 279 21 683 17 15,556 793 1,313 16 5,269
ROADWAY EARTHWORK VOLUMES
CUT FILL
CY CY
BUS PAD 175 4
RIGHT TURN EXTENSION 81 23
LEFT TURN EXTENSIONS 15 25
TOTAL 271 52
EXPORT 219
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
Q-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
QUANTITIES
STORKE RD.
HOLLISTER AVE
28 30
NORTH
STORKE ROAD
SCALE 1" = 30'
00 30' 60'
NOTES:
1. EARTHWORK VOLUMES FOR THIS PROJECT ARE CALCULATED BY SURFACE SUBTRACTION.
2. THE VOLUMES ARE CALCULATED SUBTRACTING ORIGINAL GROUND TO BOTTOM OF SUBGRADE OR FINISHED GROUND AS APPROPRIATE.
3. VOLUMES INCLUDE THE VOLUMES OF EXISTING PAVEMENTS AND HARD SCAPE WHERE THEY EXIST.
4. "HARDSCAPE REMOVAL" INCLUDES PAVEMENT OR CONCRETE AREAS WHERE THEY EXIST.
ORANGE AREAS ARE HARDSCAPE REMOVAL
93 SHEET
PROJECT NO.
OF
PLAN DATE
9062
S-1
JANUARY 20, 2023
29 30
94 P/L
Exist R/W
Exist R/W
Exist R/W
Exist R/W
EASE
EASE
EASE
EASE
EASE
073-440-016
073-440-024 073-440-018
Exist R/W
Exist R/W
073-100-032
48 49
50 51
52 53
"STO"
R/W
R/W
TCE
TCE
TCE
TCE
R/W
R/W
R/W
R/W
R/W
R/W
1 2
3 4
5 6
7 8
X X
X
X
X X
X
X
TREE REMOVALS:
20" SYCAMORE
5" & 6" OLIVE
6" & 10" OLIVE
16" SPRUCE
5" & 8" OLIVE
14" SPRUCE
5" JACARANDA
16" SPRUCE
1 2
3 4
5 6
7 8
SHEET
PROJECT NO.
OF
PLAN DATE
CHECKEDDESIGN
R.C.E. 48052
PROJECT ENGINEER
DESIGN CONSULTANT:
BENGAL ENGINEERING
360 S. HOPE AVE. SUITE C-110
SANTA BARBARA, CA 93105
STORKE ROAD / HOLLISTER AVE. TRANSIT,
BIKE / PED, AND MEDIAN IMPROVEMENTS
9062
TR-1
NO. DATE REVISIONS APPD.
HAO SO
SCOTT ONISHUK
JANUARY 20, 2023
PREPARED FOR:
NORTH
STORKE ROAD
SCALE 1" = 20'
00 10' 20'
TREE REMOVAL PLAN
STORKE RD.
MARKETPLACE DR.
30 30
95 ATTACHMENT 3
2025 ARTERIAL PAVEMENT PROJECT SPECIFICATIONS
96 BOOK 1 OF 2
BID BOOK
FOR
2025 ARTERIAL PAVEMENT PROECT
CITY PROJECT NUMBER: N/A
FOR USE WITH CALTRANS STANDARD SPE CIFICATIONS DATED 2018, CALTRANS STANDARD PLANS DATED 2018 AND LABOR SURCHARGE AND EQUIPMENT RATES OF
THE CALIFORNIA DEPARTMENT OF TRANSP ORTATION INSOFAR AS THE SAME MAY APPLY AND IN ACCORDANCE WITH THE SPECIAL PROVISIONS.
Pre-Bid Meeting:
N/A
City of Goleta, 130 Cremona Drive, Suite B
Goleta, CA 93117
Bids to be received before:
April 8, 2025
PlanetBids
97 City of Goleta
Contract Documents
2025 ARTERIAL PAVEMENT PROJECT
98 Table Of Contents
SECTION I NOTICE TO CONTRACTORS NTC‐1
SECTION II BIDDING INSTRUCTIONS BI‐1
SECTION III PROPOSAL PROP‐1
SECTION IV AGREEMENT 1
SECTION V INSURANCE AND BONDS INS 1
SECTION VI CITY OF GOLETA CONSTRUCTION
SPECIFICATIONS GCS‐1
SECTION VII SPECIAL PROVISIONS SP‐1
99 SECTION I
NOTICE TO CONTRACTORS
100
NTC 1
NOTICE TO CONTRACTORS
INVITING SEALED BIDS
FOR THE
2025 ARTERIAL PAVEMENT PROJECT
City Project Number: N/A
PUBLIC NOTICE IS HEREBY GIVEN that the City of Goleta (“CITY”), invites sealed bids for the above stated project and will receive such bids via electronic transmission on the City of Goleta
Planet Bids portal site until April 8, 2025, at 3:00 PM Late proposals will be rejected.
No exceptions.
Copies of the Contract Documents and the Proposal Forms for bidding the project, may be obtained from the Pl
anetBids Website: https://pbsystem.planetbids.com. Proposals which do not acknowledge a
ddendums to the project documents will be rejected.
All communications relative to this pr
oject shall be conducted through PlanetBids.
Questions about alleged patent ambiguity of the plans, s pecifications, or estimate must be asked
before bid opening. After bid op
ening, the CITY does not cons ider these questions as bid protests.
A pre-bid meeting will be held at N/A.
It is required that th e Bidders have fully ins pected the Project site in all particulars and become thoroughly familiar with the terms and conditio ns of the Bid Plans and Special Provisions and local c
onditions affecting the performance and cost s of the Work prior to bidding and it is recommended
that this be done prior to attending this meeting.
Pursuant to California Labor Code Sectio n 1773, the City has ascertained the General Prevailing Rate of Wages in the County in which the work is to be done to be as determined by the Director of Industrial Relations of the State of California. Contractor is hereby made aware that information regarding prevailing wage rates may be obtained from the State Department of Industrial Relations and/or t he following webs ite address: https://www.dir.ca.gov/OPRL/2024- 1/PWD/Southern.html. The Contractor is required to post a copy of the applic able wage rates at the job site. Attention is directed to Section 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC of the State Standard Specific
ations.
The California Air Res
ources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regu lations (“Regulation”) which are effective on January 1, 2024 and apply broadly to all self-p ropelled off road diesel vehicl es 25 horsepower or greater and other forms of equipment used in California. A copy of t he Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as c odified in Title 13 of the C alifornia Code of Regulations section 2449 et seq. throughout the term of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors the most recent, valid Certificate of 101
NTC 2
Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.
Bidders must be registered on the City of Goleta’s Pl anetBids portal in order to receive addendum notifications and to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.
Bid must be accompanied by a bid security in the form of a money order, a certified cashier’s check, or bidder’s bond executed by an admitted surety, made payable to CITY. The bid security shall be an amount equal to ten per cent (10%) of the to tal annual bid amount included with their proposals as required by California law.
Note: All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) lowest bidders must be mailed or submitted to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope and be received or postmarked within three (3) City working days after the bid due date an d time for the bid to be co nsidered. The sealed envelope should be plainly marked on the outside, “SEALED BID SECURITY FOR 2025 ARTERIAL PAVEMENT PROJECT.”
The Project is subject to compliance monito ring and enforcement by the Department of Industrial Relations (DIR) per California Labor Code Section 1771.4, including prevailing wage rates and apprenticeship employment standards . Affirmative action to ensure against
discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The CITY her eby affirmatively ensures that all business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract.
In accordance with the California Public Contract Code 20103.5 when federal funds are involved in local agency contracts, no bid shall be invalidated by the failure of the bidder to be licensed in California at t he time of bid opening. However, at the time of award, the selected contractor shall be properly licen sed in accordance with the laws of the State and the City of Goleta. Contractor shall possess a valid Class A - General Engineering Contractor license prior to award of Contract. Said license shall be maintained during the contra ct period. It is the Bidder’s and Contractor’s responsibility to obtain the correct Contractor’s licenses. Bidders shall be skilled and regularly engage in the general class or type of work called for under this contract.
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Sect ion 995.120, and that is a California admitted surety insurer.
Pursuant to Labor Code sections 1725.5 and 1771. 1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the DIR. No Bid will be accepted, nor any contract entered into without 102
NTC 3
proof of the contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project. Failure to provide proof of the contractor’s current registration pursuant to Labor Code Section 1725.5 may result in rejection of the bid as non-responsive.
The Contractor Company, including the Re sponsible Managing Offi cer (RMO) for the Contractor Company, shall demons trate a minimum of five (5) years' experience successfully performing projects of substantia lly similar type, magnitude, and ch aracter of the work bid. The CITY reserves the right to reject all bids, reject any bid that is not responsive to the invitation, or to waive any minor irregularity and to take all bids under advisement for a period of up to ninety (90) working days. Failure to provide proof of t he Contractor’s current registration pursuant to Section 1725.5 of the Labor Code may result in rejection of the bid as non-responsive. Failure to comply with enforcement provisions pursuant to Section 1771.4 of the Labor Code may result in a determination that the Bidder is not responsible.
Bids shall remain open and valid for a period of one hundred twenty (120) calendar days after the Bid Deadline.
Pursuant to Public Contract Code section 22300, the successful bidder may substitute certain securities for funds withheld by CITY to ensure performance under the Contract or, in the alternative, request the CITY to make payment of retention to an escrow agent.
The U.S. Department of Transportation (DOT) provides a toll-free “hotline” service to report bid rigging activities. Bid rigging activi ties can be reported Mondays through Fridays, between 8:00 a.m. and 8:00 p.m., Eastern Time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report these activities. The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction cont ract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.
Any protest to an intended award of this cont ract shall be made in writing addressed to the City Clerk prior to the award. Any protest may be considered and acted on by the City Council at the time noticed for award of the contract. To request a copy of the notice of agenda for award, please contact the City Clerk [email protected] or register on the CITY’s website (www.cityofgoleta.org).
CITY OF GOLETA
_________________________
Deborah S. Lopez, City Clerk
Published:
March 6, 2025
103
NTC 4
END OF NOTICE TO CONTRACT
ORS
104
SECTION II
BIDDING INSTRUCTIONS
105
BI- 1
SECTION II BIDDING INSTRUCTIONS
1 DEFINITIONS. Unless provided otherwise, the definitions in the contract documents are applicable to all contract documents.
1.1 “Addenda” means written or graphic instruments issued by the City before the bid deadline that modify or interpret the contract documents by additions, deletions, clarifications, or corrections.
1.2 “Alternate” means an amount stated in the bid for whic h the Bidder offers to perform the Work described in the Biddi ng Documents as Alternate Work, to be added or deducted from the Total Base Bid, which shall be Contractor’s responsibility if City accepts the Alternate Bid Item.
1.3 “Bid Deadline” means the date and time designated in the notice inviting sealed bids as the last date and time for receipt of bids, as may be revised by addenda.
1.4 “Bidder” means a person or firm that submits a bid.
1.5 “Bidding/Contract Docum ents” means the Contra ct, Addenda, Notice to Contractors, bidding instructions, Bid (including documentation accompanying the Bid and any post-bid documentation submitted prior to the Notice of Completion) when attached as an exhibit to the Contract, the Bonds, permits from jurisdictional regulatory agencie s, City of Goleta Construction Specifications, Special Provisions, Plans, State Standard Plans, Standard State Specifications, Revised Standard Specifications, Labor Surcharge and Equipment Rental Rates, Work Directives, Reference Specifications, Change Orders, Supplemental Agreements, Appendices, Project Plans and any other applicable documents not listed, including modifications incorporated in those documents.
1.6 “Contract Price” means the total aggr egate amount of the Contractor’s bid price based on the estimated quantities listed in the Bidding Sheet as set forth in the award of the Contract approv ed by the City Council, subject to adjustment for variances in quantit ies and changes pursuant to Change Orders executed in accordance with the Contract Documents.
1.7 “Inspector” means the person designated by the engineer to ensure specification compliance.
1.8 “Total Base Bid” means the sum stated in the bid for which bidder offers to perform the Work described in the cont ract documents, but not including alternates.
1.9 “Unit or Contract Unit Price” means an amount entered in the bid by bidder or a “Contract Item” price established by the City in the bid, as a price per unit of measurement for payment for material s, equipment or services including taxes, supervision, overhead and profit for a portion of the work described in the Contract Documents.
106
BI- 2
2 BIDDER’S REPRESENTATIONS. By making its bid, bidder represents that:
2.1 Bidder has read, understood, and made the bid pursuant to the requirements in the Contract Documents.
2.2 The Bidder, at its sole cost and expense, has carefully examined the Contract Documents and visited the Project site to become fully acquainted with the local site condi tions affecting the Work to be performed including transportation, disposal, handling, and storage of materials.
2.3 The bid and the Contract Unit Pr ices bid are based upon the labor, materials, equipment, and systems required by the Contract Documents.
2.4 Bidder and all subcontractors, regar dless of tier, have the appropriate registrations and current licenses i ssued by the State of California Contractor’s State License Boar d and Department of Industrial Relations (DIR) for the Work to be performed. If bidder is a joint venture, the bidder will have a joint venture license appropriate for the performance of the Work, and each me mber of the joint venture will likewise have the appropriate license. Business and professions code §§ 7000-7191 establish licensing require ments for contractors. If a bidder, that is a specialty contractor , submits a bid involving 3 or more specialized building trades, the Work of which is more than incidental and supplemental to the performance of the Work for which bidder holds a specialty contractor license, bi dder must also hold either (1) a specialty contractor “C ” license in each such trade or (2) a general engineering contractor “A” license. This requirement is applicable whether or not bidder lists a subcontractor for each such trade.
2.5 Bidder shall have the expertise, in cluding the Responsible Managing Officer (RMO) for the Contractor Company, demonstrating a minimum of five (5) years' experience succe ssfully performing projects of the same type, magnitude, and characte r of the work bid, and financial capacity to perform and complete a ll obligations under the Contract Documents.
2.6 Bidder is aware of and, if awar ded the contract, will comply with legal requirements in its performance of the Work.
2.7 Bidder is aware of and, if identified as the apparent lowest responsible bidder, would be required to pay City business license fee(s).
2.8 Bidder shall not damage or endanger and shall preserve and protect adjacent properties.
2.9 Bidder has familiarized itself wit h the staging and material storage constraints of the Project site and surrounding buildings and will confine its staging and storage operations to approved areas.
107
BI- 3
2.10 Bidder will coordinate its constr uction activities with the other contractors and utility companies performing work on the Project site, if any, including, but not limited to, any separate contractor retained by the City.
2.11 Bidder has checked the figures set forth in the bid schedule and understands that neither the City nor any officer or employee therefore will be responsible for any misunderst andings, errors, or omissions on the part of the Bidder in submitting it s Bid. The failure of a Bidder to receive or examine any of the Contract Documents or to inspect the site shall not relieve such Bidder from any obligation with respect to the Bid, the Contract, or the Work required under the Contract Documents. 3 CONTRACT DOCUMENTS.
3.1 Bidders may obtain complete sets of the Contract Documents from PlanetBids.
3.2 Bidders will use a complete set of Contract Documents in preparing bids.
3.3 The City makes copies of the Cont ract Documents available, on the above terms, for the sole purpose of obtaining bids for the Work and does not confer a license or grant permission for any other use of the Contract Documents.
3.4 The City does not assume any liabilit y or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Contract Documents.
4 INTERPRETATION OR CORRECTION OF CONTRACT DOCUMENTS.
4.1 Before submitting its bid, bidder will carefully study and compare the various documents comprising the C ontract Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the bid is submitted; will examine the project site, the conditions under which the Work is to be performed, and the local conditions ; and will at once report to the City’s representative errors, inconsistencies, or ambiguities discovered.
The drawings and specifications contained in these Contract Documents do not constitute a repr esentation or warranty that any conditions shown therein actually exist. All soil and test hole data, groundwater elevations, and soil analyses shown on the Plans or included in the Special Provisions apply only at the location of the test holes and to the depths indicated.
4.2 Bidder requests for clarification or interpretation of the Contract Documents will be addressed to the Cit y’s representative at least five (5) calendar days before the bid deadline.
4.3 Clarifications, interpretations, corrections, and changes to the Contract Documents will only be made by addend a. Purported clarifications, 108
BI- 4
interpretations, corrections, and changes to the Contract Documents made in any other manner will not be binding and bidders will not rely upon them.
5 PRODUCT SUBSTITUTIONS.
5.1 No requests for product substitutions will be considered before award of contract.
6 SUBCONTRACTORS.
6.1 Each bidder will list in the proposal form all first-tier subcontractors that will perform work, labor or render such services in excess of ½ of one percent of the total bid of the total bid or $10,000, whichever is greater.
The proposal form contains spaces for the following information when listing subcontractors: (1) work activity; (2) name of subcontractor; (3) city of subcontractor’s business lo cation; (4) California contractor’s license number, and (5) DI R public works contractor registration number. An inadvertent error in lis ting the California contractor’s license number or public works contractor re gistration number shall not be grounds for filing a bid protes t or grounds for considering the bid nonresponsive if the corrected contractor's license number is submitted to the City by the Bidder within 24 hours after the bid opening and provided the corrected contractor's license number corresponds to the submitted name and location for that subcontractor. Failure to list any of these other items on the proposal form will result in the City treating the bid as if no subcontractor was listed for the work and that bidder repr esents to the City that it is fully qualified to perform that portion of the Work and will so perform such Work.
6.2 Substitution of subcontractors after the bid deadline who are listed in the proposal form will only be allow ed with the City’s written consent and in accordance with California law.
7 ADDENDA.
7.1 Before the Bid Deadline, the City ma y modify the Work, the Contract Documents or any portion(s) thereof by the issuance of written addenda.
Addenda will be in writing and issued only by the City.
7.2 Bidders must be registered on the Cit y’s PlanetBids portal to receive addendum notifications. Addenda will be posted on the PlanetBids portal.
7.3 Addenda will be made available on PlanetBids.
7.4 The City will issue addenda so that they are received by prospective bidders not less than three (3) work ing days before the bid deadline.
Addenda that withdraw the request for bids or postpone the bid deadline may be issued any time before the bid deadline.
109
BI- 5
7.5 Each bidder is responsible for ensur ing that it has re ceived all issued addenda before submitting a bid. All bidders are required to acknowledge and confirm receipt of each and ever y addendum in their Bid Proposal Form. Failure to acknowledge all Ad denda may result in a Bid being deemed nonresponsive and not eligible for award of the Contract. 8 NOT USED
9 FORM AND STYLE OF BIDS.
9.1 Bids will be submitted on the proposal forms included with the Contract Documents. Bids not submitted on the City’s proposal forms will be rejected. All blanks on the proposal form will be filled in legibly.
9.2 Bidder’s failure to submit a price for any alternate or unit price will result in the bid being considered as non-responsive. If alternates are called for and no change in the lump sum base bid is required, enter “no change.”
9.3 Each bidder must fill out the “b idders statement of past contract disqualifications” form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The bidder must explain the circumstances of each disqualification.
9.4 Bidder will make no stipulations on the proposal form nor qualify the bid in any manner.
9.5 The bids will be based upon full completion of all the Work as shown on the plans and specifications. It is ex pressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the bidder (if awarded the contract) specifically agrees to construct a completed Work ready for the use and in the manner which is intended.
9.6 The proposal forms will be signed by a person or persons legally authorized to bind bidder to a contract. Bidder’s representative will sign and date the declaration of eligibility to contract included in the proposal form. Failure to sign and date the declaration will cause the bid to be rejected.
10 BID SECURITY.
10.1 Each bid must be accompanied by bid security, in the amount of 10% of the Total Base Bid on the bas e Contract Work, excluding any Alternate Bid Items, as security for bidder’s obligation to enter into a contract with the City on the terms stated in the proposal form and to furnish all items required by the Contract Documents.
10.2 All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) apparent lowest bidders must be ma iled to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope 110
BI- 6
and be received or postmarked within three (3) City working days of the bid due date and time for the bid to be considered. The sealed envelope should be plainly marked on the outside identifying the names as shown in the notice inviting sealed bids.
10.3 If the apparent lowest responsible bidder fails to sign the contract and furnish all items requir ed by the contract docu ments within the time limits specified in these bidding inst ructions, the City may reject such bidder and select the next apparent lo west responsible bidder until all bids have been exhausted or the City ma y reject all bids. In the event the bid is rejected, such bidder wil l be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the bid security, between the amount of the disqualified bid and the larger amount for which the City procures the Work. The City may also use the bid security to cover the cost of rebidding the project.
10.4 If a bid bond is submitted and an attorney-in-fact executes the bid bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the bid bond. The surety issuing the bid bond must be admitted to provide surety within the State of California.
10.5 The City will retain the bid security until the occurrence of one of the following:
10.5.1.1 All items required by the c ontract documents have been furnished and the contract has been signed by the successful bidder and the City.
10.5.1.2 The specified time has elapsed during which bids may be withdrawn.
10.5.1.3 All bids have been rejected.
11 BID DELIVERY.
11.1 The proposal forms, bid security, and all other documents required to be submitted with the bid must be submitted via electronic transmission on the City of Goleta PlanetBids portal site.
11.2 Bidders must be registered on the City of Goleta’s PlanetBids portal in order to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.
11.3 Bid Security shall be submitted in accordance with Section 10. “Bid Security” above and per the notice inviting sealed bids. 12 MODIFICATION OR WI THDRAWAL OF BID.
12.1 Bids may not be modified, withdraw n, or canceled within one hundred twenty (120) calendar days after the bid deadline unless otherwise 111
BI- 7
provided in any supplementary instructions to bidders. The bidder shall be prohibited from further bidding on the project and the bid bond shall be forfeited. The City, at its discretion, may aw ard the bid to the next responsive and responsible bidder. In the event the next bidder refuses to enter into the contract, that bidder’s bid bond shall then be forfeited. 13 OPENING OF BIDS.
13.1 Bids submitted in the manner requi red by these instructions and received on or before the bid deadline will be opened and available for viewing on PlanetBids.
14 EVALUATION AND REJECTION OF BIDS.
14.1 Bidders will be evaluated for respons iveness and responsibility based on bid proposal information provided in the bid documents under “designation of subcontractors” and bidder’s references.”
14.2 A responsive Bid is a Bid that conforms, in all material respects, to these Instructions to Bidders. Non-responsive Bids will be rejected.
14.3 A responsible bidder means a bi dder who has demonstrated the attributes of trustworthiness, quality, fitness, capac ity, and experience to satisfactorily perform fully t he requirements of the Contract Documents and the moral and business integrity and reliability that will assure good faith performance in the sole discretion of the City. Any determination of a bidder’s non-responsibility by the City shall be based on the fitness and capacity of the bidder to satisf actorily perform the obligations of the Contract, whether or not the bidder is qualified to perform those obligations, whether or not the bidder is trustworthy, and such other bases as may be relevant.
14.4 In addition to other provisions of the Contract Documents, upon the request of the City, a bidder whose Bid is under consideration for the award of the Contract s hall promptly submit sa tisfactory evidence to City showing the bidder’s financial resources, experience in the field, and organization and other factors evidencing bidder’s ability to successfully execute and complete the Contract.
14.5 The City reserves the right to reje ct any or all bids and to waive discrepancies, irregularities, informalities, or any other error in the bid or bidding, when to do so seems to best serve the public interest. The right of the City to waive errors applies even if the Contract Documents state that a discrepancy, i rregularity, informality, or other error make a bid nonresponsive, so long as the error does not constitute a material error. The City reserves the right, in its sole discretion, to: judge the bidder’s representations as stated in the proposal forms and any post- Bid information to determine whether or not bidder is qualified to perform the Work; be the sole j udge regarding the su itability of the products, services, or supplies offered; to not purchase all items or the full quantity of each item listed in the Bid Item List; reject any or all Bids; 112
BI- 8
waive any deficiencies, i rregularities, or informalit ies in any Bids or in the bidding process; modify, cancel, or withdraw the Notice Inviting Sealed Bids; issue a new Notice Inviting Sealed Bids; suspend or abandon the Project; seek the assist ance of outside technical experts in Bid evaluation; require a bi dder to provide a guarantee (or guarantees) of the Contract by a thir d party; and not issue a Notice to Proceed after execution of the Contract. In submitting a Bid in response to the Notice Inviting Sealed Bi ds, the bidder is specifically acknowledging the City holds these rights. The Notice Inviting Sealed Bids does not commit the City to enter into a Contract, to reject, in its sole discretion, all Bids, nor does it obligate the City pay for any costs incurred by bidders in preparation and submission of a Bid or in anticipation of a Contract. By submitting a Bid, the bidder disclaims any right to be paid for such costs.
14.6 The City may reject any bid not accompanied by the required bid security or any other item required by the contract documents, or a bid which is in any other way materially incomplete, irregular or not responsive to the bid request in the sole determination of the City. 15 AWARD.
15.1 The City may retain all bids for a period of one hundred and twenty (120) calendar days for examination and comparison, and to delete any portion of the Work from the contract.
15.2 The City may waive nonmaterial irr egularities in a bid and will accept the lowest responsive bid from a responsible bidder as determined by the City.
15.3 The City will determine the low bidder on th e basis of the total bid price in words on the bidding sheet as described on the bidding sheet.
15.4 City Staff will identify the apparent lowest responsive and responsible bidder and notify such bidder within (30) working days (unless the number of days is modified in any Addendum issued to bidd ers) after the Bid Deadline. Within ten (10) calendar days after receiving the City’s written notice that bidder was identified as the apparent lo west responsible bidder, bidder will submit to the City all of the following items as required by the City:
15.4.1 Two originals of the contract signed by bidder.
15.4.2 One original of the payment bond.
15.4.3 One original of the performance bond.
15.4.4 Certificates of insurance and additional insured endorsements.
15.4.5 Copy of current city of Goleta business license certificate.
15.4.6 Names of all subcontractors, wit h their DIR registration number, license numbers, addresses, telephone number, facsimile number and trade on bidders’ company stationery. Evidence, as required by the 113
BI- 9
city, of the reliability and responsibility of the proposed subcontractors such as statements of experience, statements of financial condition, and references.
15.5 A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the cont ractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. This Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.
15.6 If bidder submits the two original signed contracts and all other items within ten (10) working days after re ceiving the City’s notification, and all such items comply with the requirements of the contract documents, the City will submit the bid to the City Council for award of Contract.
Following City Council Award of Contract, the City will sign the contract and return a signed copy of the contract to bidder.
16 NOTICE OF INTENT TO AWARD CONTRACT.
Following the opening of bids and determi nation of the lowest responsible Bidder, the City will issue a notice of int ent to award the Contract, identifying the Bidder to whom the City intends to award the Contract. The award of the Contracts shall be made by the City Council.
17 PUBLIC RECORDS.
City seeks to conduct its business openly. Upon identification of the lowest responsive and responsible bidder and upon notifying such bidder, Bids shall be regarded as public, with the exception any elements of each Bid that are identif ied by the Bidder as business or trade secrets and plainly marked as “trade secret,” “confidential,” or “proprietary.” Each element of a Bid which a Bidder de sires not to be considered public must be clearly marked as set forth above; any blanket statement (i.e. regarding entire pages, documents, or ot her, non-specific designations) shall not be sufficient and shall not bind the City in any way whats oever. If City receives a request from a third party to make a Bid available for insp ection or copying, the City will notify the Bidder of the request. If a Bi dder instructs the City that th e information is not to be released, City will withhold the information, provided, the Bidder expeditiously seeks a protective order from a c ourt of competent jurisdiction to prevent such release. If disclosure is required by law (despite the Bidder’s request for confidentiality), the City shall not in any way be liable or responsible for the disclosure of such records or part thereof.
18 BID PROTEST.
114
BI- 10
Any registered Bidder may file a protest provided that each and all of the following are complied with:
18.1 The bid protest is in writing;
18.2 Protests based upon alleged defects or improprieties in the Contract Documents are filed with the City prior to the Bid Deadline;
18.3 All other protests are f iled and received by the City not more than five (5) calendar days following the date of City’s Notice of Intent to Award the Contract; and
18.4 The written bid protest sets forth, in detail, all grounds for the bid protest, including without limitation all fact s, supporting documentation, legal authorities and argument in support of the grounds for the bid protest.
All factual contentions must be supported by competent, admissible and credible evidence.
18.5 Any matters not set forth in the wr itten bid protest shall be deemed waived. Any bid protest not conforming to the foregoing shall be rejected by the City as invalid.
19 COMPLIANCE WITH CARB REGULATIONS
The City is a Public Works Aw arding Body, as defined under Title 13 California Code of Regulations Section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, a valid Certificate of Repor ted Compliance (“CRC”) for t he Bidder’s and its listed subcontractors fleet (including any applicable leased equipment or vehicles). Bidder must complete and submit the Fleet Compliance Ce rtification, on the form included in the bid package. Failure to provide a valid CRC for the Bidder’s fleet, and for the fleets of all listed subcontractors, or failure to comple te the Fleet Compliance Certification, may render the Bid non-responsive.
115
SECTION III
PROPOSAL
116
PROP- 1
SECTION III PROPOSAL
BID PROPOSAL
FOR
2025 ARTERIAL PAVEMENT PROJECT
TO THE CITY OF GOLETA (“City”):
In accordance with City’s Notice Inviting Sealed Bids, the undersigned Bidder herby proposes to furnish all materials, equi pment, tools, labor, and incidentals required for the 2025 ARTERIAL PAVEMENT PROJECT as set forth in the Plans, Specifications, and Contract Documents, and to perform all work in the manner and time prescribed therein.
Bidder declares that this Bid is based upon careful examination of the Work site, Plans, Specifications, Bidding Instructions, and all other Contract Documents. If this Bid is accepted for award, Bidder agrees to enter into a contract with City at the unit and/or lump sum prices set forth in the followi ng Bid Schedule. Bidder under stands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to City of the Bid Security accompanying this Bid.
Bidder understands that a Bi d is required for the entire Work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing Bids, and that final compensation under the Contract will be based upon the actual quantities of Work satisfactorily completed. THE CI TY RESERVES THE R IGHT TO INCREASE OR
DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT per Section 9- 1.06B INCREASES OF MORE THAN 25 PERCENT and Section 9-1.06C DECREASES OF MORE THAN 25 PERCENT. It is agreed that the unit and/or lump sum prices bid include all overhead, profit, appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amount, and words shall govern over figures.
If awarded the Contract, the undersigned further agrees that in the event of the Bidder’s default in executing the Contract and filing the necessary bonds and insurance certificates WITHIN TEN (10) WORKING D AYS after the City has mailed notice of the award of contract to the Bidder, the proceeds of the Bid Security accompanying this Bid shall become the property of the City and this Bid and the acceptance hereof may, at the City’s option, be considered null and void.
117
PROP- 2
SECTION III BID PROPOSAL
FOR
2025 ARTERIAL PAVEMENT PROJECT
The Project insurance requirements are per the State Standard Specifications, as modified by the City of Goleta Construction Specifications contained herein.
Full Legal Name of Bidder: _________________________________________ Type of Entity: ___________________________________________________ (corporation, partnership, etc.)
State of Incorporation / Organization: _________________________________ Mailing Address: ________________________________________________ City, State, Zip: _________________________________________________ Physical Address: _________________________________________________ (must be included even if PO box is used for mailing)
City, State, Zip: ___________________________________________________ Telephone Number: Area Code ( )
E m a i l A d d r e s s :
California Contractor License No.
Contractor (and sub-contractors) wishing to bid on public works contracts shall be registered with the State Department of Industrial Relations and certified to bid on Public Works contracts. Register at: https://www.dir.ca.gov/public- works/contractor-registration.html.
Contractor Department of Industrial Relations Registration No.
California Contract License Classification(s) __________________________
The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (23 CRF 635.110).
The work for which this bid is submitted is for construction in conformance with the Special Provisions (including the payment of not less than the Stat e general prevailing wage rates), the Project Plans described bel ow, including any addenda thereto, the contract annexed hereto, and al so in conformance with the California Department of Transportation Standard Plans, dated 2018, the California Department of Transportation 118
PROP- 3
Standard Specifications, dated 2018, and the Labor Surcharge and Equipment Rental Rates in effect on the date the work is accomplished.
The work to be done and referred to herein is in the City of Goleta, Santa Barbara County, State of California, and is to be constructed in accordance with the Contract Documents and the Prevailing Wage Rates of the Department of Industrial Relations.
The work to be done is described in the Contract Documents entitled 2025 ARTERIAL PAVEMENT PROJECT City of Goleta, California.
The undersigned, as Bidder, declares that the only persons or parties interested in this Proposal as principals are those named her ein; that this Proposal is made without collusion with any other person, firm, or corporation; that he or she has carefully examined the location of the proposed work and the Contract Documents; and proposes, and agrees if this Proposal is accepted, that he or she will Contract with the City of Goleta, in the form of a copy of the Agreement cont ained in the Bid Document, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract, in the manner and time therein prescribed, and according to the requirements of the Director, as therein set forth, and that he or she will take in fu ll payment therefore prices i ndicated in the Schedule of Bid Items, including all work modified by addendum numbers _____________________. (IF NONE, STATE NONE).
In accordance with the provisions of California Labor C ode Section 6707, whenever the State, a County, City and County, or City issues a call for bids for the construction of a pipeline, drainage, water, sewer, sewage dispos al system, boring or jacking pits, or similar trenches or open exca vations, which are five (5' ) feet or deeper, such call shall specify that each bid submitted in response thereto shall contain, as a bid item, adequate sheeting, shoring, and bracing or equivalent method, for the protection of life or limb, which shall conform to applicable safety orders.
As required under the provisions of California Public Contract Code Section 4104 et seq., any person making a bid or offer to per form the work, shall in his or her bid or offer, set forth: (a)(1) The name and lo cation of the place of business of each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under su bcontract to the primary Contractor specially fabricates and installs a portion of t he work or improvement acco rding to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent (0.5%) of the prime Contractor' s total bid or, in the ca se of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of one percent (0.5%) of the prime contract or’s total bid or ten thousand dollars ($10,000) whichever is greater; (2)(A) Subject to subparagraph (B), any information requested by the officer, 119
PROP- 4
department, board, or commission concerni ng any subcontractor who the prime contractor is required to list under this subdivision, other than the subcontractor’s name and location of business, may be submitted by the prime contractor up to 24 hours after the deadline established by the officer, depar tment, board, or commi ssion for receipt of bids by prime contractors; (B) A state or local agency ma y implement subparagraph (A) at its option; (b) The portion of the work that will be done by each such subcontractor under this Act. The prime Contra ctor shall list only one (1) subcontractor for each such portion as defined by the prime Contractor in his or her Bid.
120
PROP- 5
2025 ARTERIAL PAVEMENT PROJECT
BIDDING SHEET
The cost of all labor, material and equipment necessary for the completion of the work itemized, even though not shown or specified, shall be included in the unit or lump sum prices for the various items shown herein.
The City further reserves the right to reject any or all bids, to waive any informality or irregularity in any bid or the bidding proce dure, and to delete any items of work in the award of contract. The City's decision on the bid amount is final.
Bidders must bid on all items in the Bid Schedule including the Supplemental and/or Alternative Bid Items in order for their bids to be complete. The award of contract will be based on the criteria outlined in Section 14 of the Bidding Instructions.
In the case of unit basis items, the amount set forth under the "Item Total" column (total base bid in words) shall be the pr oduct of the unit price bid and the estimated quantity for the item.
Bids on lump sum items are item totals. If a unit price of a lump sum item is entered and it differs from the item total, the item total prevails.
Entries are to be expressed in dollars or decimal fractions of a dollar. Symbols such as commas and dollar signs are ignored and have no significance in establishing unit price or item total.
Unit prices and item totals are interpre ted by the number of digits and decimal placement. Do not round item totals or the total bid.
In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price prevails, except as provided in (a) or (b), as follows:
(a) If the amount set forth as a unit pric e is unreadable or other wise unclear, or is omitted, or is the same as the amount of the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price;
(b) (Decimal Errors) If the product of the entered uni t price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one- hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever mo st closely approximates percentage-wise the unit price or item total in the City's Final Estimate of cost.
If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise, if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided. 121
PROP- 6
REPLACE WITH PDF OF PROJECT SPECIFIC BIDDING SHEET
122
PROP- 7
LIST OF SUBCONTRACTORS
The Bidder shall list the name, address, license number, and description of work, bid item number, percentage of bid item subcontracted by cost and Departm ent of Industrial Relations Registration number for each subcontractor to whom the Bidder proposes to subcontract portions of the work, as required by the prov isions in Section 2-1.10 SUBCONTRACTOR LIST of the State Standard Specificat ions. Attention is also directed to Section 5-1.13 SUBCONTRACTING of the Specia l Provisions. Listed subcontra ctors must be registered with the Department of Industrial Relations. Pursuant to SB 854, this project is subject to compliance monitoring and enforcement by the Department of Industrial Relati ons (DIR). Bidder shall list the DIR registration number for each subcontractor.
Bidder proposes to subcontract certain portions of the Work which are in excess of one- half of one percent (0.5%) of the total amount base bid or $10,000, whichever is greater, and to procure materials and equipment from suppliers and vendors.
These Subcontractors are identified as follows:
Bid Item
Number(s)
Subcontractor
License
Number
Subcontractor
DIR
Registration
Numbe
r
Percent of
Total Bid
Subcontractor’s
Name & Address
123
PROP- 8
Bid Item
Number(s)
Subcontractor
License
Number
Subcontractor
DIR
Registration
Number
Percent of
Total Bid
Subcontractor’s
Name & Address
124
PROP- 9
BIDDER’S REFERENCES
The following are the names, addresses, and phone numbers for three public agencies for which Bidder has performed projects of the same magnitude and character of the work bid within the past five (5) years:
1. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount
2. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount
3. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount
The following are the names, addresses, and phone numbers for all brokers and sureties from whom Bidder intends to procure insurance bonds:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any local, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.
125
PROP- 10
ELIGIBILITY TO CONTRACT
The successful Bidder is prohibited from performing work on this Project with a Subcontractor who is ineligible to perform work on the Project pursuant to Section 1777.1 or 1777.7 of the Labor Code.
BIDDER’S INFORMATION
Bidder certifies that the following information is true and correct:
Bidder’s Name ___________________________________________________________ Business Address _________________________________________________________ ________________________________________________________________________ Telephone _______________________________________________________________ State Contractor’s License No. and Class ______________________________________ Original Date Issued Expiration Date _______________________________ DIR Registration No: _______________________________________________________
The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this Bid:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ The date of any voluntary or involuntar y bankruptcy judgments against any principal having an interest in this Bid are as follows:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ All current and prior DBA’s, alias, and/or fictitious business names for any principal having an interest in this Bid are as follows:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 126
PROP- 11
I declare under penalty of perjury under the laws of the State of California that the above representations are true and correct. Execut ed this _____ day of ____________, 20__, at ___________________ California.
Signature and Title of Bidder
or Authorized Representative
127
PROP- 12
BIDDER’S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS AND DEFAULTS
Identify all instances of being disqualified, removed, determined to be a non-responsible bidder, debarred, assessed liquidated damages, terminated for default or otherwise prevented from bidding on, or completing, a federal, state, or local government project.
1. Have you ever been disqualifi ed from any government contract?
Yes No
2. If yes, explain the circumstances including date of public entity action, name of project, contract award amount and current contact person at public entity:
____________________________________________________________ Signature and Title of Bidder or Authorized Representative 128
PROP- 13
BID BOND FOR:
2025 ARTERIAL PAVEMENT PROJECT
KNOW ALL PERSONS BY THESE PRESENTS that [Bidder] ________________________ __________________________ as PRINCIPAL, and __ _____________________________, a corporation organized under the laws of the State of __________ _______________ and licensed by the State of California to execut e bonds and undertakings as sole surety, as SURETY, are held and firmly bound unto the City of Goleta, as City, in the penal sum of ten percent (10%) of the total Base Bid Price on the base Contract Work, excluding any Alternate Bid Items submitted by PRINCIPAL to CITY for the above stated project, for the payment of which sum, PRINCIPAL and SURETY agree to be bound, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas PRINCIPAL has submitted a proposal to CITY for the above stated project.
NOW, THEREFORE, the penal sum guaranteed by this bond shall be forfeited to the City in the event of any of the follo wing: (1) The aforesaid Principal with draws said bid after the Bid Deadline contrary to applicable law; or (2) Principal fails, within ten (10) working days after receipt of written notice that the contract has been awarded to Principal and tender of the Contract, to, deliver to City the executed Agreement, in the prescribed form, in accordance with the bid as accepted, and file with the City all documents required in Section 3-1.18 CONTRA CT EXECUTION of the City of Goleta Construction Specifications.
In case suit is brought upon this bond, SURETY further agrees to pay all reasonable attorneys’ fees and costs incurred by CITY in an amount fixed by the court. SURETY hereby waives the provisions of California Civil Code Sections 2845 and 2849.
IN WITNESS WHEREOF the parties hereto have se t their names, titles, hands, and seals this _______day of , 20__.
P R I N C I P A L :
( A d d r e s s )
B Y :
(Signature and Title of Authorized Officer)
B Y :
(Signature and Title of Authorized Officer)
129
PROP- 14
S U R E T Y :
( A d d r e s s )
B Y :
(Signature and Title of Authorized Officer)
B Y :
(Signature and Title of Authorized Officer)
Note: All signatures must be acknowledged befor e a notary public. Attach appropriate acknowledgment. Also, evidence of the authority of any person signing as attorney-in-fact must be attached.
130
PROP- 15
STATEMENT ACKNOWLEDGING PENAL AND CIVIL PENALTIES CONCERNING THE CONTRACTOR’S LICENSING LAWS
[Business & Professions Code § 7028.15; Public Contract Code § 20103.5]
The undersigned, a duly authorized representative of the Bidder, certify that I am aware of the provisions of California law and that I, or the company /individual on whose behalf this Bid is being submitted, hold a currently valid California contractor’s licens e as set forth in the Business and Professions Code § 7028.15 and Public Contract Code § 20103.5 (and any updates).
A contractor shall not be qualif ied to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unle ss currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violati on of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
B i d d e r :
License No.: Class Expiration date:
DIR Registration No.: _____________________
Date Signature
131
PROP- 16
DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code §§ 1777.1 and 1777.7; Public Contract Code § 6109] The undersigned, a duly authorized representative of the Bidder, certifies and declares that:
1. The Bidder is aware of Sections 1771.1 and 1777.7 of the California Labor Code, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.
2. The Bidder is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sect ions 1771.1 or 1777.7 of the California Labor Code or any other provision of law.
3. The Bidder is aware of California Public Contract Code Section 6109 (and any updates.)
4. The Bidder has investigated t he eligibility of each and every subcontractor the contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontra ctor on a public works projec t by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 and 1777.7 of the Labor Code, or any other provision of law.
5. A contractor or subcontract or shall not be qualified to bi d on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perfo rm public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, prov ided the contractor is regist ered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of , 20__, at ________________________, California.
Signature:
N a m e :
T i t l e :
Name of Company:
Note: Signature must be acknowledged before a notary public. Attach appropriate acknowledgment.
132
PROP- 17
NON-COLLUSION DECLARATION
FOR
2025 ARTERIAL PAVEMENT PROJECT
I am the [title] of [name of bidder], the
party making the foregoing bid, declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly, colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any m anner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pa y, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effe ctuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a co rporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state]
(Signature and Title of Authorized Representative)
133
PROP- 18
(THE BIDDER'S EXECUTION ON THE SIGNAT URE PORTION OF THIS PROPOSAL SHALL
ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH
ARE A PART OF THIS PROPOSAL)
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder______________ ___________________________________________________, proposed subcontractor _______________________________________________, hereby certifies that he has_____, has not___, participat ed in a previous contract or s ubcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporti ng Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agen cy, or the form er President’s Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment O pportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60- 1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime contractors and subcontractors who have par ticipated in a previous contract or subcontract subject to the Execut ive Orders and have not f iled the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Direc tor, Office of Federal Contract Compliance, U.S. Department of Labor.
___________________________________________________________
134
PROP- 19
PUBLIC CONTRACT CODE
Public Contract Code Section 10285.1 Statement
In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has ___ , has not ___ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State Universi ty. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managi ng employee thereof, as referred to in Section 10285.1.
Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided.
The above Statement is part of t he Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
135
PROP- 20
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Co ntract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidd er, ever been disqualified, remov ed, or otherwise prevented from bidding on, or completing a federal, state, or lo cal government project because of a violation of law or a safety regulation?
Yes _____ No _____
If the answer is yes, explain the circumstances in the following space.
136
PROP- 21
PUBLIC CONTRACT CODE 10232 STATEMENT
In conformance with Public Cont ract Code Section 10232, the Cont ractor, hereby states under penalty of perjury, that no more than one final unappealable finding of c ontempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to co mply with an order of a federal court which order s the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Statement and Questionnaire are part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement and Questionnaire.
Bidders are cautioned that maki ng a false certification may subject the certifier to criminal prosecution.
137
PROP- 22
DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that , except as noted below , he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, volunt ary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgement rendered agains t it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Notes: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Bid. Signing this Bid on t he signature portion thereof shall also constitute signature of this Certification.
_________________________________________
138
PROP- 23
IRAN CONTRACTING ACT DISCLOSURE FORM
GENERAL
GENERAL REQUIREMENTS
A. Pursuant to the Iran Contract Act of 2010 (California Public Contract Code, Sections 2202- 2208), Bidders are ineligible to bid on projects with a public entity for goods or services of one million dollars ($1,000,000) or more if the Bidder engages in investment activities in Iran.
B. Bidders must provide the below disclosure form as a mandatory submittal for all projects in excess of $1,000,000. The Iran Contracting Act Disc losure Form shall be submitted by the 3 apparent low bidders within 7 working days after opening of the bids.
(California Public Contract, Sections 2202-2208)
When responding to a bid or proposal or executing a contract or renewal for a City contract for goods or services of $1,000,000 or more, a vendor must either: a) certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section 220 3(b) and is not a financ ial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 working days or more, if that other person will use the credit to provide goods or servi ces in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran cr eated by DGS; or b) demonstr ate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code Section 2203(c) or (d).
To comply with this requirement, please provide your vendor or financ ial institution name and complete one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of $250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)
OPTION #1 – CERTIFICATION
I, the official named below, certif y I am duly authorized to execute this certificat ion on behalf of the vendor/financial institution identified below, and the vendor/financial institution identified below is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million ($20,000,000) or more in credit to another person/vendor, for 45 working days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.
Vendor Name/Financial Institution (Printed)
By (Authorized Signature)
139
PROP- 24
Printed Name and Title of Person Signing
Date Executed Executed in
OPTION #2 – EXEMPTION
Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services.
If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please fill out the information below, and attach documentation demonstrating the exemption approval.
Vendor Name/Financial Institution (Printed)
By (Authorized Signature)
Printed Name and Title of Person Signing
Date Executed Executed in
140
PROP- 25
DRUG-FREE WORKPLACE POLICY AND
AFFIDAVIT
BID MAY BE DECLARED NONRESPONSIVE IF THIS FORM (COMPLETED) IS NOT ATTACHED.
Pursuant to City Council Resolution CC90-498 dated 6/26/90 the following is required.
The undersigned Proposer certifies that it and all subcontractors performing under this contract will provide a drug-free workplace by:
1. Publishing a "Drug-Free Workplace" statement not ifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the Contractor's workplace and specifying the actions that will be taken against employees for violations of such prohibition.
2. Establishing a Drug-Free Awareness Program to inform employees about:
a. The dangers of drug abuse in the workplace.
b. The Contractor's policy of maintaining a drug-free workplace. c. Any available drug counseling, rehabilitation, and employee assistance program. d. The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace.
3. Notify employees that as a condition of employment under this Contract, employees will be expected to:
a. Abide by the terms of the statement.
b. Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace.
4. Making it a requirement that each employee to be engaged in the performance of the Contract be given a copy on the "Drug-Free Workplace" statement.
5. Taking one of the following appropriate actions, within thirty (30) working days of receiving notice from an employee or otherwise receiving such notice, that said employee has received a drug conviction for a violation occurring in the workplace:
a. Taking appropriate disciplinary action against such an employee, up to and including termination; or
b. Requiring such employee to participate sati sfactorily in a drug abuse assistance or rehabilitation program approved for such purpose s by a federal, state, or local health, law enforcement or other appropriate agency.
* I certify that no person employed by this company, corporation, or business has been convicted of any criminal drug statute violation on any job site or project where this company, corporation, or business was performing work within three
(2) years of the date of my signature below.
EXCEPTION:
Date Violation Type Place of Occurrence
If additional space is required use back of this form.
*The above statement will also be incorporated as a part of each subcontract agreement for any and all subcontractors selected for performance on this project.
IN THE EVENT THIS COMPANY, CORPORATION, OR BUSINESS IS AWARDED THIS CONSTRUCTION CONTRACT, AS A RESULT OF THIS BID; THE PROPOSER WITH HIS/HER SIGNATURE REPRESENTS TO THE CITY THAT THE INFORMATION DISC LOSED IN THIS DOCUMENT IS CO MPLETE AND ACCURATE. IT IS
UNDERSTOOD AND AGREED THAT FALSE CERTIFICATION IS SUBJECT TO IMME DIATE TERMINATION BY THE CITY.
The Representations Made Herein On This Document Are Made Under Penalty Of Perjury. 141
PROP- 26
PROPOSER'S NAME:
BY: Date:
Signature Title
Effects of violations: a. Suspension of payments under this contract. b. Suspension or termination of the contract. c. Suspension or debarment of the contractor from receiving any contract from the City of Goleta for a period not to exceed five years.
FM 681 7/10/9
142
COMPLIANCE WITH ECONOMIC SANCTIONS
IN RESPONSE TO RUSSIA’S ACTIONS IN UKRAINE
SAPC Information Notice 22-15
Per Executive Order N-6-22, all contractors and grantees that have agreements valued at $5 million or more with agencies/departments subject to the California Governor’s authority are directed to report to their contracting or grantor agency or depar tment regarding their compliance with economic sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as sanctions imposed under state law, if any.
Instructions: Complete Section 1, provide a letter for Section 2 and return both to your CPA. 1) ATTESTATION OF COMPLIANCE:
Having conducted a good faith review, I attest that
(agency name) is in compliance with the economic sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as sanctions imposed under state law, if any.
Contractor/Provider Name (Printed): Contract Number (s):
By (Authorized Signature):
Printed name and title of authorized signor:
Date of Signed Attestation of Compliance:
2) REPORT OF ACTIONS/STEPS TAKEN:
Attach a brief report to this notice form, on your agency letterhead describing the steps and actions, if any, you have taken in response to Russia’s actions in Ukraine and to ensure compliance with the EO. Please note that responses may be subject to disclosure under the California Public Records Act. Accordingly, please do not include any confidential information or disclosures that could pose security risks.
143
Fleet Compliance Certification.
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct: