and would
reduce the potential impacts to sensitive natural communities to a less -
than
-
significant level.
Implementation of Mitigation Measure BIO
-
1h, above, would prevent people from
accessing and
damaging off
-
site marsh habitat
.
This impact would be les
s than significant with
implementation of
mitigation.
Mitigation Measures
Implementation of Mitigation
Measure BIO
-
1h
,
as described above under Impact BIO
-
1. Implementation of
Mitigation
Measure BIO
-
3 ,
as described below under Impact BIO
-
3. Significance A
fter Mitigation
Implementation of Mitigation Measure
s BIO
-
1h and
BIO
-
3 would reduce potential impacts to
sensitive natural communities to a less
-
than
-
significant level.
Threshold
3 :
Would the project ha
ve a substantial adverse effect on state or federally protected wetlands (including but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Environmental Impact Analysis
Biological Resources
Draft Environmental Impact Report
4.1 -
23 Impact BIO
-
3 T
HE PROPOSED PROJECT WOULD
REQUIRE THE
PE
RMANENT
FILL OF APPROXIMATELY
0.28 ACRE OF SEASONAL WETLANDS AND
0.69 ACRE OF SALT MARSH AND ASSOCIATED UNVEGETATED WATERS IN
REMNANT SALT PONDS ON THE EASTERN COMPONENT OF THE PROJECT SITE .
I
MPACTS WOULD BE LESS THAN
SIGNIFICANT WITH MITIGATION
.
The propo
sed project would not involve construction or operation activities within the western component of the project site.
The proposed project would have no impacts on wetlands or other waters within the western component of the project site.
According to the c
onfirmed Preliminary Jurisdictional Determination
map
a total of 1.69 acres
of
potentially jurisdictional wetlands are located within the eastern component of the
project site. This
includes 1.41 acres of salt marsh and 0.28 acres of seasonal wetlands
considered to be federally
protected wetlands as defined by CWA Section 404. Of these total on -
site wetlands,
construction of
the proposed project would require the
permanent
fill of approximately 0.28 acre of seasonal
wetlands and 0.69 acre of sa
lt marsh and associated unvegetated waters in remnant salt ponds on the eastern component of the project site.
Fill would be permanent because a portion of the
proposed parking lot and relocated San Francisco Bay Trail segment would be constructed on top o f
the fill material.
Although t
he proposed project would include preservation of
all wetlands and
other waters
on the western component of the project site
, the
fill of approximately 0.28 acre of
seasonal wetlands and 0.69 acre of salt marsh
on the eastern
component
would be a potentially
significant
adverse
impact
.
I
mplementation of Mitigation Measure BIO
-
3 would be required to
reduce potential impacts to protected wetlands to a less -
than
-
significant level.
Mitigation Measure
BIO
-
3 Protected Wetlands Mitig
ation Credits
To compensate for impacts to
approximately
0.97 acre of waters of the U.S., the
project
applicant
shall
purchase wetland mitigation credits at a
minimum of
1:1 mitigation ratio from an approved
mitigation bank with a Service Area that covers
the project site. The San Francisco Bay Wetland
Mitigation Bank currently has "Tidal Wetland and Other Waters Creation" credits available
for
purchase
.
Either the U.S. Army Corps of Engineers or the CDFW may adjust the mitigation ratio and the applicant sh
all comply, but in
no
case shall the mitigation ratio be less than 1:1.
Significance A
fter Mitigation
Implementation of Mitigation Measure BIO
-
3 would reduce potential impacts to
federally protected
wetlands
to a less
-
than
-
significant level.
4.1.4 Cumulative Impacts
The cumulative setting for biological resources includes proposed development and construction within Hayward that is west of Interstate 880
. This cumulative extent is appropriate because it
encompasses
the mosaic of representative habitat types (and associated biological resources) affected by the proposed project, including a variety of wetlands habitats and industrial uses along the shoreline.
Areas to the east of Interstate 880 are urban until the fo othills of the East Bay Hills,
which provide habitat unlike that in areas west of Interstate 880, including the project site and San Francisco Bay shoreline.
The project site is located just north of the CDFW Eden Landing Ecological Reserve and west of ex
isting office/light industrial uses. Implementation of the proposed project would be consistent City of Hayward
4350 Point Eden Way Industrial Development Project
4.1 -
24 with both of these surrounding uses, as part of the project would construct a new industrial building and the other part would involve preservation of an open s pace/wetland preserve on the western
side of the project site. Project activities would occur entirely on the project site, and the interaction between the affected environment and project activities and facilities would be limited to this area.
Cumulative
projects within the assessment area are listed in Table 3 -
1, in Section 3, Environmental
Setting. The projects listed in Table 3
-
1 are not along the shoreline of the San Francisco Bay. There are no salt ponds at cumulative project sites because they are n ot along the shoreline of the Bay and
were not used for salt production, unlike the project site. Therefore, cumulative projects in Table 3 -
1 would not impact special
-
status species found in salt marsh habitat, such as salt marsh harvest mouse or salt mars
h wandering shrew.
However, cumulative project sites may support other
special
-
status species that could also be impacted by the project, such as migratory nesting birds or special
-
status bat species.
For example, the residential subdivision project propos ed at 24765
Hesperian Boulevard is on a property with trees and vegetation cover, which could be used by nesting birds.
Cumulative projects may also contain wetlands and riparian habitat. Specifically, construction of the cumulative projects could
result i
n:
Trampling, and degradation of sensitive habitats
Disruption of habitat values associated with edge habitat
Degradation of wetlands, creeks, drainages, riparian habitat, water quality, associated habitat values and functions, and ecosystems services; inc
luding channelization of storm runoff that
may increase stream flow, erosion, and sedimentation
Disruption of wildlife utilization of biological resources for foraging; hydration; cover, shelter, aestivation/hybernacula; nesting and breeding; movement, dis persal, and migration, sensitive
and native nesting birds
, and special
-
status bats.
Loss of sensitive natural communities
including seasonal wetlands
Introduction of litter (including human foods), urine and fecal matter, illegal off -
leash dogs
(causing ha
rassment and mortality of wildlife)
Taken cumulatively, these impacts would result in degradation of the suite of habitat types and associated biological resources that occur within the cumulative setting in the Hayward Regional Shoreline area and could re
sult in overall diminished regional ecological functions and values.
However, impacts to biological resources would be considered and mitigated on a project -
by
-
project basis. Permanent losses of sensitive habitats, including sensitive natural communities a nd
listed species, associated with cumulative development would be mitigated to a less than significant level. As such,
the project’s contribution to
cumulative impacts would be significant but mitigable
,
and after mitigation would not be cumulatively cons
iderable
.
Mitigation measures for biological resources identified in this EIR would reduce project -
level
impacts to a less than
significant level.
Mitigation Measure BIO
-
3 would
require the project
applicant to compensate for impacts to 0.97 acre of waters of the U.S. by purchasing wetland mitigation credits at a 1:1 ratio from an approved mitigation bank with
in
a
s
ervice
a
rea covering the
project site. This would mitigate permane
nt loss of waters of the U.S., and also support preservation of essential habitat for the SMHM to promote the recovery of the species in the region.
Implementation of these mitigation measures
outlined in this section
and above in Impact BIO
-
1 would reduce
project
-
level impacts to a less than significant level and would ensure that the project’s contribution to cumulative biological resources impacts would not be cumulatively considerable.
Environmental Impact Analysis
Cultural Resources
Draft Environmental Impact Report
4.2 -
1 4.2
Cultural
Resources
This section assesses
the potential for the proposed project to result in
impact
s
to cultural
resources
, including historic resources and prehistoric or archaeological resources.
4.2.1 Setting
a.
Regional Setting
Prehistory
The
project site is
in
the San Francisco Bay Area archaeological region (Milliken et al. 2007, Moratto 1984). Following Milliken et al. (2007), the prehistoric cultural chronology for the Bay Area can be generally divided into five periods: The Early Holocene (8,000 -
3,500 BCE),
Early (3,500
-
500 BCE),
Lower Middle (500 BCE to CE 430), the Upper Middle (CE 430 -
1050), and the Late Period (CE1050
-
contact).
The five general prehistoric periods are summarized below.
Early Holocene (8,000
-
3,500 BCE)
Archaeological evidence from the
early Holocene is limited, as many sites dating to this period are likely buried under Holocene alluvial deposits (Moratto 1984; Ragir 1972). The available data suggest that the Early Holocene in the San Francisco Bay Area is characterized by a mobile fora ger
pattern and the presence of millingslabs, handstones, and a variety of leaf -
shaped projectile points.
Early Period (3,500
-
600 BCE)
The Early Period saw the introduction of new ground stone technologies (i.e., mortar and pestle), an increase in regional
trade, and the first cut shell beads. By 1,500 BCE, mortars and pestles had almost completely replaced millingslabs and handstones. The advent of the mortar and pestle indicates a greater reliance on processing nuts such as acorns.
The earliest cut bead h
orizon is also
associated with this period. (Milliken et al. 2007).
Lower Middle Period (500 BCE
-
CE 430)
Rectangular shell beads, common during the Early Period, disappear completely and are replaced by split
-
beveled and saucer Olivella beads
during the L
ower Middle Period
. Mortars and pestles
continued to be the dominant grinding tool (Milliken et al. 2007). Evidence for the Lower Middle Period in the Bay Area comes from sites such as the Emeryville shell mound (CA -
ALA
-
309) and Ellis
Landing (CA
-
CCO
-
295)
(Moratto 1984).
Upper Middle Period (CE 430
-
1050)
Around CE 430, Olivella saucer bead trade networks that had been established during earlier periods collapsed and over half of known sites occupied during the Lower Middle Period were abandoned.
New types o
f material culture appear at sites, including elaborate, decorative blades, fishtail charmstones, new Haliotis ornament forms, and mica ornaments. Sea otter bones became more abundant, suggesting changes in faunal exploitation patterns from earlier periods
(Milliken et al.
2007).
City of Hayward
4350
Point Eden Way Industrial Development Project
4.2 -
2 Late Period (CE 1050
-
Contact)
The Late Period saw an increase in social complexity, indicated by differences in burials, and an increased level of sedentism relative to preceding periods. Small, finely worked projectile points asso
ciated with bow and arrow technology appear around CE 1250
(Milliken et al. 2007). This period
saw an increase in the intensity of resource exploitation that correlates with an increase in population (Moratto 1984).
Ethnographic Overview
The project site
i
s
an area traditionally occupied by the Ohlone (or Costanoan) people. The pre -
contact Ohlone were semi
-
sedentary, with a settlement system characterized by base camps and seasonal reserve camps composed of tule reed houses with thatched roofs made of matte d grass
(Schick 1994; Skowronek 1998). Just outside a base camp, there was sometimes a large sweat house built into the ground near stream banks used for spiritual ceremonies and possibly hygiene (Schick 1994, Jones 2015).
Ohlone
cemeteries
were set away from villages and visited during the annual Mourning Anniversary (Leventhal and DiGiuseppe 2009). Some Ohlone graves have been found with ritually buried animals, such as wolf, squirrel, deer, mountain lion, gray fox, elk, badger, grizzly be ar, blue goose,
and bat ray. Similar to human burials, ceremonial offerings were added to ritually buried animal graves like shell beads, ornaments, and exotic goods (Kroeber 1925; Field and Leventhal 2003; Jones 2010).
Ohlone subsistence was based on hun
ting, gathering, and fishing (Kroeber 1925:467, Skowronek 1998).
S
maller game
was
hunted and snared on a regular basis (Schick 1944:17). Like the rest of California, the acorn was an important staple and was prepared by leaching acorn meal both in openwork
baskets and in holes dug into the sand (Kroeber 1925:467). Fishing was
done with nets
and gorge hooks out of tule reed canoes (Schick 1994:16 -
17). Mussels were a particularly important
food resource (Kroeber 1925:467), along with sea mammals (Kroeber 1925 :467).
Seven Franciscan missions were built within Ohlone territory in the late 1700s, and all members of the Ohlone group were eventually brought into the mission system (Kroeber 1925:462, Skowronek 1998). After the establishment of the missions, Ohlone
population dwindled from roughly 10,000
people in 1770 to 1,300 in 1814 (Skowronek 1998
).
History
The Post
-
European contact history of California is generally divided into three periods: the Spanish Period (1769
–
1822), the Mexican Period (1822
–
1848), and
the American Period (1848
–
present).
Each of these periods is briefly described below.
Spanish Period (1769
–
1821)
Spanish exploration of California began when Juan Rodriguez Cabrillo led the first European expedition into the region in 1542
, but it took
more than 200 years to establish a settlement
(Bean
1968; Rolle 2003). In the autumn of 1769, an expedition led by Gaspar de Portolá entered San Francisco Bay. Portola sent a detachment led by Jose Francisco de Ortega in search of a land route to Point Rey
es. By November, the party reached a stream that was most likely Alameda Creek, whose course passes approximately 2.5 miles southeast of the project site
. On March 31, 1776,
an
expedition
led by
Juan Bautista de Anza
established a campsite at Arroyo de la
Harina, near what is
now Hayward City Hall (Circa 2009).
Environmental Impact Analysis
Cultural Resources
Draft Environmental Impact Report
4.2 -
3 During this period,
the
influx of European settlers brought the local Native American population in contact with European diseases which they had no immunity against, resulting in a catastrophic redu
ction in native populations throughout the state (McCawley 1996).
Mexican Period (1821
–
1848)
The Mexican Period commenced when news of the success of the Mexican War of Independence (1810
–
1821) against the Spanish crown reached California in 1822. Thi s period saw the
privatization of mission lands in California with the passage of the Secularization Act of 1833. During this era, a class of wealthy landowners known as rancheros worked large ranches based on cattle hide and tallow production. In the earl
y 1840s, the area now comprising Hayward was granted as two ranchos making up separate divisions of Rancho San Lorenzo. In 1841, Mexican Governor Juan Alvarado granted Guillermo Castro a 600
-
acre tract. Two years later, Governor Juan B. Alvarado
granted Ca
stro an additional six leagues of “former mission grazing lands” in 1843. Castro eventually constructed an adobe residence near the present location of Mission Boulevard and C Street in downtown Hayward. In 1842 and 1844, neighboring lands located south of
San Lorenzo Creek were
issued to Francisco Soto (Circa 2009; Kyle 2003).
American Period (1848
–
Present)
The Mexican Period officially ended in early January 1848 with the signing of the Treaty of Guadalupe Hidalgo, formally concluding the Mexican
-
Ameri
can War. Under the treaty, the United
States agreed to pay Mexico $15 million for conquered territory, including California, Nevada, Utah, and parts of Colorado, Arizona, New Mexico, and Wyoming.
The discovery of gold in Northern
California in 1848 led to
the California Gold Rush (Workman 1935; Guinn 1976). The Gold Rush significantly transformed Northern California and contributed to an exponential increase in the territory’s population overall. During this time, San Francisco became California’s first tru e city,
growing from a population of 812 to 25,000 in only a few years. California was admitted as a state in 1850, and b
y 1853, its
population
exceeded 300,000.
Hayward (ca. 1850
–
Present)
American
-
era settlement in what is now Hayward began in the latter half of the 19 th
century with
the establishment of a handful of small communities, including Hayward (originally named Haywards), Russell City, and Mt. Eden.
The
nearby San Francisco Bay sh
oreline was home to
important shipping points for produce farmed in the Amador and Livermore valleys. The arrival of the rail service in Hayward in 1865 eventually undercut local shipping ventures but made Hayward a local overland transportation hub. Along
the shoreline, industry was shaped by several solar salt producers, who established plants with large evaporating ponds amid the bay’s tidal marshes. John Johnson built the first of these near Mt. Eden in 1853. Salt plants soon proliferated, and by the 18 90s several operations run by families or small corporations existed in the area. Among these outfits was that of Swedish immigrant Andrew August Oliver, who established the Acme Salt Company near Mt. Eden in 1872. His sons would later run the Oliver Broth ers Salt Company, which
developed the
current
project
site
as a salt works (Watt et al. n.d.; Anonymous 2020).
As was the case in many California communities, the state’s population boom was felt locally, as Hayward’s
population increased from 6,700 in 194
0 to 72,000 in 1960. Demand for housing helped
to inflate local real estate prices, convincing many farmers to sell their holdings to residential and commercial developers. As Hayward expanded, it annexed several outlying communities to the City of Hayward
4350
Point Eden Way Industrial Development Project
4.2 -
4 south and west,
including Russel
l
City, Mt. Eden, and the area comprising the
project site
(Circa
2009; 2010).
b.
Project Site Setting
Records Search
Rincon
Consultants
requested a search of the California Historical Resources Information System (CHRIS) at the Northwestern
Information Center (NWIC), located at Sonoma State University. NWIC staff conducted the search and Rincon
Consultants
received the results on August 24, 2020.
The
CHRIS search included a review of the NRHP, CRHR, the California Points of Historical Intere st list,
the California Historical Landmarks list, the Archaeological Determinations of Eligibility list, the Built Environment Resource Directory, and the California State Historic Resources Inventory list.
The
records search results identified 45 previously conducted cultural resources studies within a 0.5 -
mile radius of the project site, of which seven studies included a portion of the project site: S -
001743, S
-
009768, S
-
02300, S
-
023200a, S
-
023200b, S
-
0232
00c, and S
-
023200d.
E
ight previously
recorded cultural resources were
also
identified through the records search
.
These include five
historic archaeological sites, three historic buildings or structures, and one historic landscape. Two of these resources a
re present within the project site;
one is included in the western component (a
historical
-
period archaeological site), one is included in the eastern component (the Oliver Brothers Salt Company), and one is adjacent. The historical
-
period archaeological s
ite recorded within the
project site was completely collected at the time of its recording and is therefore no longer present.
Historical Aerial Imagery Review
Rincon
Consultants
conducted a review of historical aerial photographs and topographic maps to identify potential cultural resources concerns within the project site. The research individuated that salt fields began development in 1942, with three buildings and evaporators emerging by 1958.
Grading within the
eastern component of the
project site is
identified from 1987 to the present day.
Pedestrian Field Survey
Rincon
Consultants
conducted a pedestrian field survey of the project site on September 22, 2020.
All areas of
exposed ground surface
were examined
for artifacts (e.g., flaked stone tools,
tool
-
making debris, stone milling tools, ceramics, fire
-
affected rock), ecofacts (marine shell and bone),
soil discoloration that might indicate the presence of a cultural midden, soil depressions, and features indicative of the former presence of structur
es or buildings (e.g., standing exterior walls,
postholes, foundations) or historic debris (e.g., metal, glass, ceramics). Ground disturbances such as burrows and drainages were also visually inspected. Transects were generally spaced 10 to 20 meters throu
ghout the survey based on surface visibility.
All buildings, structures, and landscaped
features within the project site were
visually inspected
,
documenting their style, method of
construction, and physical condition
.
Results of the survey indicated that
the project site has been heavily disturbed.
Disturbance was
evident throughout the
project site
in the form of soil spoils piles, nonlocal gravel, concrete and construction debris, and levee construction. Ground visibility was limited by the presence of s
tanding water in the water storage ponds in the western portion of the project site and by vegetation in the eastern portion of the project site. No archaeological resources were identified within the
project site
during the field survey.
Environmental Impact Analysis
Cultural Resources
Draft Environmental Impact Report
4.2 -
5 Soil Remediation
To obtain further understanding of the sensitivity of the project site, Rincon
Consultants
reviewed
the soil remediation studies conducted by Aqua Science Engineers, Inc.
(2013).
In
1998 two
underground storage tanks containing diesel
-
fuel and hydrocarbon
s were removed from the project
site and from 1
998 to 2012 soil remediation efforts includ
ed
multiple soil samples taken of the
contaminated area
s,
and groundwater assessments to determine the extent of the site contamination
(Aqua Science Engineers 2013)
.
Additionally,
“
h
ot spots”
were identified
within the
project site
,
which were
excavated, bioremediated onsite,
then
backfilled. Other soil remediation
efforts included overexcavation, in
-
situ soil treatment, and groundwater monitoring.
Other
remediation e
fforts included the destruction of 12
monitoring wells, the deepest well approximately
360 feet below
ground
surface (Aqua Science Engineers 2013). Soil remediation efforts covered approximately 16 percent of the
western component of the
project site
, and
approximately 81
percent of
the eastern component of the site
.
4.2.2 Regulatory Setting
Cultural resources, including built environment and archaeological resources, may be designated as historic by national, state, or local authorities. For a resource to qualif y for listing in the National
Register of Historic Places (NRHP), the California Register of Historical Resources (CRHR), or as a locally significant resource, it must meet one or more identified criteria of significance. The resource must also retain suff
icient historic integrity, defined in National Register Bulletin 15 as the “ability of a property to convey its significance” (National Park Service 1990). An explanation of these designations follows.
a.
Federal Regulations
National Register of Historic Plac
es
The National Register of Historic Places (NRHP) was established by the National Historic Preservation Act (NHPA) of 1966 as “an authoritative guide to be used by Federal, State, and local governments, private groups and citizens to identify the Nation’ s cultural resources and to indicate
what properties should be considered for protection from destruction or impairment” (CFR 36 CFR
60.2). The NRHP recognizes properties that are significant at the national, state, and local levels. To be eligible for lis
ting in the NRHP, a resource must be significant in American history, architecture, archaeology, engineering, or culture. Districts, sites, buildings, structures, and objects of potential significance must also possess integrity of location, design, settin g, materials, workmanship, feeling,
and association. A property is eligible for the NRHP if it is significant under one or more of the following criteria:
Criterion A:
It is associated with events that have made a significant contribution to the broad patt
erns of our history;
or
Criterion B:
It is associated with the lives of persons who are significant in our past;
or
Criterion C:
It embodies the distinctive characteristics of a type, period, or method of construction, or represents the work of a
master, or possesses high artistic values,
or represents a significant and distinguishable entity whose components may lack individual distinction; and/or
Criterion D:
It has yielded, or may be likely to yield, information important in prehistory or history.
City of Hayward
4350
Point Eden Way Industrial Development Project
4.2 -
6 In addition to meeting these criteria, a property must retain historic integrity, which is defined in National Register Bulletin 15 as the “ability of a property to convey its significance” (National Park Service 1990). In order to assess integrit
y, the National Park Service recognizes seven aspects or qualities that, considered together, define historic integrity. To retain integrity, a property must possess several, if not all, of these seven qualities, which are defined in the following manner i n
National Register Bulletin 15:
Location.
The place where the historic property was constructed or the place where the historic event occurred;
Design.
The combination of elements that create the form, plan, space, structure, and style of a property;
Set
ting.
The physical environment of a historic property;
Materials.
The physical elements that were combined or deposited during a particular period of time and in a particular pattern or configuration to form a historic property.
Workmanship.
The physical e
vidence of the crafts of a particular culture or people during any given period in history or prehistory;
Feeling.
A property’s expression of the aesthetic or historic sense of a particular period of time; and/or
Association.
The direct link between an imp
ortant historic event or person and a historic
property.
b.
State Regulations
California Environmental Quality Act
Under CEQA, a “project that may cause a substantial adverse change in the significance of an historic resource is a project that may have a sign
ificant effect on the environment” (California
Public Resources Code [PRC] Section 21084.1). Answering this question is a two -
part process: first,
the determination must be made as to whether the proposed project involves historic
resources;
second, if
his
toric
resources are present, the proposed project must be analyzed for a potential “substantial adverse change in the significance” of the resource.
California Register of Historical Resources
The CRHR helps government agencies identify, evaluate, and prot ect California’s historical
resources, and indicates which properties are to be protected from substantial adverse change (PRC Section 5024.1(a)). The CRHR is administered through the State Office of Historic Preservation, a part of the California State Pa
rks system.
A
historic
resource is evaluated under four CRHR criteria to determine its historical significance. A resource must be significant at the local, state, or national level in accordance with one or more of the following criteria set forth in the
State CEQA Guidelines at Section 15064.5(a)(3):
1. It is associated with events that have made a significant contribution to the broad pattern of California’s history and cultural heritage.
2. It is associated with the lives of persons important in our past.
3. It
embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values.
Environmental Impact Analysis
Cultural Resources
Draft Environmental Impact Report
4.2 -
7 4.
It has yielded, or may be likely to yield, information important i n prehistory or history.
In addition to meeting one or more of the above criteria, the CRHR requires that sufficient time must have passed to allow a “scholarly perspective on the events or individuals associated with the resource.” Fifty years is used as
a general estimate of the time needed to understand the historical importance of a resource according to State Historic Preservation Office publications. CRHR also requires a resource to possess integrity, defined as “the authenticity of a historical resou rce’s
physical identity evidenced by the survival of characteristics that existed during the resource’s period of significance. Integrity is evaluated with regard to the retention of location, design, setting, materials, workmanship, feeling, and associati
on.” Archaeological resources can sometimes qualify
as “historical resources” [CEQA Guidelines, Section 15064.5(c)(1)].
According to CEQA, all buildings constructed over 50 years ago that possess architectural or historical significance may be considered
potential historic resources. Most resources must meet
the 50
-
year threshold for historic significance, but resources less than 50 years in age may be eligible for listing on the CRHR if it can be demonstrated that sufficient time has passed to understand
their historical importance.
If a project can be demonstrated to cause damage to a unique archaeological resource, the lead agency may require reasonable efforts to permit any or all of these resources to be preserved in place or left in an undisturbed sta
te. To the extent that resources cannot be left undisturbed, mitigation measures are required (PRC Section 21083.2[a], [b], and [c]).
PRC Section 21083.2(g) defines a unique archaeological resource as an artifact, object, or site about which it can be
clearly demonstrated that, without merely adding to the current body of knowledge, there is a high probability that it meets any of the following criteria:
1)
Contains information needed to answer important scientific research questions and that there is a de
monstrable public interest in that information
2)
Has a special and particular quality such as being the oldest of its type or the best available example of its type
3)
Is directly associated with a scientifically recognized important prehistoric or historic eve nt
or person
Two other programs are administered by the state: California Historical Landmarks and California “Points of Historical Interest.” California Historical Landmarks are buildings, sites, features, or events statewide significance and that have an
thropological, cultural, military, political, architectural, economic, scientific or technical, religious, experimental, or other historical value. California Points of Historical Interest are buildings, sites, features, or events of local (city or county)
significance and
that have anthropological, cultural, military, political, architectural, economic, scientific or technical, religious, experimental, or other historical value.
Impacts to significant cultural resources are considered a significant effect on the environment if
they affect the characteristics of any resource that qualify it for the NRHP or adversely alter the significance of a resource listed in or eligible for listing in the CRHR. These impacts could result from physical demolition, destruc
tion, relocation, or alteration of the resource or its immediate surroundings such that the significance of an historical resource would be materially impaired (CEQA Guidelines, Section 15064.5 [b][1], 2000). Material impairment is defined as demolition or
alteration in an adverse manner [of] those characteristics of an historical resource that convey its historical significance and that justify its inclusion in, or eligibility for inclusion in, the CRHR (CEQA Guidelines, Section 15064.5[b][2][A]).
City of Hayward
4350
Point Eden Way Industrial Development Project
4.2 -
8 Codes Go
verning Human Remains
The CEQA Guidelines Section 15064.5 also assign special importance to human remains and specifies procedures to be used when Native American remains are discovered. The disposition of human remains is governed by Health and Safety Cod
e Section 7050.5 and PRC Sections 5097.94
and 5097.98; it falls under the jurisdiction of the Native American Heritage Association (NAHC). If human remains are discovered, the county coroner must be notified within 48 hours and there should be no further d
isturbance to the site where the remains were found. If the remains are determined by the coroner to be Native American, the coroner is responsible to contact the NAHC within 24 hours. The NAHC, pursuant to PRC Section 5097.98, will immediately notify thos e persons
it believes to be most likely descended from the deceased Native Americans so they can inspect the burial site and make recommendations for treatment or disposal.
c.
Local
Regulations
City of Hayward
The City of Hayward adopted a Historic Preservati
on Ordinance in 1989
, and comprehensively
updated that the Ordinance
in 2010
. The purpose of this Ordinance is to promote the public health, safety and general welfare of the inhabitants of the City by providing for the identification, protection, enhancem
ent, perpetuation and use of historical resources, including buildings, structures, signs, objects, features, sites, historic and prehistoric archaeological sites, places, districts, designed landscapes, cultural landscapes and areas within the City that r eflect special
elements of the City's architectural, artistic, cultural, engineering, aesthetic, historical, political, social and other heritage (Article 11, Section 10
-
11.010). The City or any property owner may
request the designation of an historical r
esource or a potentially significant historical resource or the designation of an historic district by submitting an application for such designation to the Planning Division. The Planning Commission is authorized to approve in whole or in part, or disappr
ove in whole or in part, the application for designation of the resource as an historical resource on the local register (Article 11, Section 10
-
11.090). The Ordinance specifies that a
property may be determined historically significant if it possesses one
of the following:
1)
An association with events that have made a significant contribution to the broad patterns of national, state and/or local history and cultural heritage
2)
An association with the lives of persons significant in national, state and/or local
past
3)
The embodiment of the distinctive characteristics of a type, period, region, or method of construction, or that represent the work of a master or important creative individual, or that possess high artistic values, or that represent a significant and
distinguishable entity
whose components may lack individual distinction
4)
Details that have yielded, or may be likely to yield, information important in prehistory or history
4.2.3 Impact Analysis
a.
Methodology and Significance Thresholds
This section describes th
e potential environmental impacts of
the proposed project
relevant to
cultural
resources.
The analysis evaluates the potential for proposed activities to result in
impact
s
to
cultural resources, based on records of resources within the project site ,
observ
ations of the
Environmental Impact Analysis
Cultural Resources
Draft Environmental Impact Report
4.2 -
9 pedestrian survey completed by Rincon Consultants in September 2020 , and the history and
sensitivity of the project vicinity
. Complete documentation of the records search and pedestrian survey, including potential impacts to resources, is pro vided in the Cultural Resources Assessment
Report, prepared by Rincon Consultants, Inc. in February 2021. The Cultural Resources Assessment Report is provided as Appendix
B
to this EIR.
According to Appendix G
of the State
CEQA Guidelines
, impacts related to
cultural resources
from
the proposed project would be significant if the project would:
Cause a
substantial adverse
change in the significance of a historical resource pursuant to §
15064.5;
Cause a substantial adverse change in the significance of an archaeological resource pursuant to §
15064.5; or
Disturb any human remains, including those interred outside of formal cemeteries.
b.
Impact Analysis
Threshold
1 :
Would the project cause a substanti
al adverse change in the significance of a
historical resource pursuant to §15064.5?
Impact CUL
-
1 D
EMOLITION OF THE
O
LIVER
B
ROTHERS
S
ALT
C
OMPANY PROCESSING PLANT AND
FILLING OF PORTIONS OF THE
ASSOCIATED
SALT EVAPORATION PONDS
ON THE EASTERN COMPONENT OF THE
PROJECT SI
TE
WOULD ADVERSELY
IMPACT FEATURES THAT CONTRIBUTE TO THE SIGNIFICANCE OF
A HISTORIC
AL
RESOURCE
.
I
MPACTS WOULD BE SIGNIFICANT
AND UNAVOIDABLE
.
The proposed project would not involve construction or
operation
activities within the western
component of the p
roject site. The proposed
wetland preserve within the western component of
the project site would involve no maintenance or operational activities. Therefore, the proposed wetland preserve
would have no impacts on
historic resources within the
western comp
onent of
the project site.
The field survey and background research identified one built -
environment historical resource in the
eastern component of the
project site
:
the Oliver Brothers Salt Company. The resource has been determined eligible for listing in the NRHP and is listed in the CRHR; the property, therefore, qualifies as a historical resource as defined by CEQA.
The project site, including the eastern and
west
ern component of the site, are also part of a historic landscape affiliated with the former salt production operations.
Although the proposed project would not result in the demolition or alteration of the salt evaporation ponds and levees located on the w estern component of the
project site, it would result in the demolition of the processing plant and filling of portions of existing salt evaporation ponds located on the eastern component of the project site. The eastern component
of the site is essential
in the larger property’s ability to convey its significance ,
as it
contains the only remaining buildings on the
project
site and is the location of the primary salt
processing activities. Due to proposed demolition and construction activities that would im pact
contributing features within the eastern component, the proposed project would cause the material impairment of the resource, meaning it would alter in an adverse manner those physical characteristics that convey its historical significance and that j ustify its inclusion in the NRHP and
CRHR.
Filling the salt ponds and demolishing the building on the eastern component of the site would also alter the historic landscape, as would constructing a new industrial building.
The project
would therefore result
in a substantial adverse change to the significance of a historical resource and result in a significant impact pursuant to CEQA.
City of Hayward
4350
Point Eden Way Industrial Development Project
4.2 -
10 Although not capable of reducing impacts to below the level of significance ,
two mitigation
measures
are
required
which woul
d minimize project impact
s
relating to the demolition of the
Oliver Brother Salt Company property to the maximum extent feasible : CUL
-
1a and CUL
-
1b
.
Mitigation Measures
CUL
-
1 a
Building Recordation
Archival documentation of as
-
built and as
-
found condition
sh
all
be prepared for the Oliver Brothers
Salt Company prior to demolition. Prior to issuance of demolition permits, the City of Hayward shall ensure that documentation of the buildings and structures proposed for demolition is completed that follows the g
eneral guidelines of Historic American Building Survey (HABS) -
level III
documentation. The documentation shall include high resolution digital photographic recordation, a historic narrative report, and compilation of historic research. The documentation sh all be
completed by a qualified professional who meets the standards for history, architectural history, or architecture as set forth by the Secretary of the Interior’s Professional Qualification Standards (36 CFR, Part 61). The original archival
-
quality d
ocumentation shall be offered as donated material to
the Hayward Library and
/or
Hayward Area Historical Society to make it available for current and future generations. Archival copies of the documentation shall
be submitted to the City of Hayward
where it
shall
be available to local researchers.
CUL
-
1b
Interpretive Display
An interpretive display shall be developed and installed on site to commemorate the history of the Oliver Brothers Salt Company. The display may include historic photographs, drawings, a nd text to
convey the history of the site and the significance of salt processing in Alameda County. The display shall be reviewed and approved by the City prior to installation at a site to be chosen by the City.
The installation shall occur prior to issu
ance of a Certificate of Occupancy.
Significance After Mitigation
Although not capable of reducing impacts to below the level of significance ,
mitigation measures
CUL
-
1a
and CUL
-
1b
would minimize project impact
s
relating to the demolition of the Oliver Br
other
Salt Company property.
Impacts would remain significant and unavoidable.
Threshold
2 :
Would the project cause a substantial adverse change in the significance of an archaeological resource
pursuant to
§15064.5?
Impact CUL
-
2 C
ONSTRUCTION OF THE PROPOSED PROJECT WOULD INVOLVE GROUND -
DISTURBING
ACTIVITIES
THAT
HAVE THE POTENTIAL TO UNEARTH OR ADVERSELY IMP
ACT PREVIOUSLY UNIDENTIFIED
ARCHAEOLOGICAL RESOURCES
WITHIN THE EASTERN COMPONENT OF THE PROJECT SITE
.
I
MPACTS WOULD BE
LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED
.
The proposed project would not involve construction or
excavation
activities within
the western
component of the project site. The proposed project would have no impacts on potential subsurface
archaeological resources within the
western component of the project site.
Construction of the proposed project, including the proposed industrial
building
, surface parking,
utilities and landscaping,
and relocated segment of the San Francisco Bay Trail
,
would involve
excavation and ground disturbance
on the site’s eastern component
. For example, the proposed
industrial building would require subsur
face utility connections that requiring trenching below Environmental Impact Analysis
Cultural Resources
Draft Environmental Impact Report
4.2 -
11 existing ground surface.
Although t
he
project site
has been
hea
v
i
ly disturbed
due to salt works
operations
and
soil remediation efforts
from 1998 to 2012
, ground
-
disturbing activities
would
have
the p
otential to unearth previously unidentified archaeological resources. Project impacts to unanticipated discoveries would be significant
but mitigable
.
Mitigation Measures
CUL
-
2 Unanticipated Discovery of
Archaeological
Resources
In the event
that
archaeological resources are
unexpectedly
encountered during ground
-
disturbing
activities, work in the immediate area
shall
be halted and an archaeologist meeting the Secretary of the Interior’s Professional Qualification
s
Standards for archeology (Nationa
l Park Service 1983)
shall
be contacted immediately to evaluate the find.
If the find is prehistoric, then a Native American
representative should also be contacted to participate in the evaluation of the find.
If necessary,
as
determined by the archaeolog
ist in consultation with the City,
the evaluation may require
preparation of a treatment plan and archaeological testing for California Register of Historical Resources
(CRHR)
eligibility. If the discovery proves to be
eligible for the CRHR
and cannot be
a
voided by the
modified project
, additional work, such as data recovery excavation, may be warranted to mitigate impacts to
archaeological
resources.
Threshold
3 :
Would the project disturb any human remains, including those interred outside of formal cemete
ries?
Impact CUL
-
3 T
HE DISCOVERY OF HUMAN REMAINS IS ALWAYS A POSSIBILITY DURING GROUND -
DISTURBING ACTIVITIES
.
G
ROUND DISTURBANCE
REQUIRED FOR CONSTRUCTION OF THE PROPOSED PROJECT
COULD
DISTURB OR DAMAGE KNOWN OR UNKNOWN HUMAN REMAINS
WITHIN THE EASTERN COMPONENT OF
TH
E PROJECT SITE
.
T
HIS IMPACT WOULD BE LESS THAN SIGNIFICANT
DUE TO MANDATORY
ADHERENCE TO
EXISTING REGULATIONS
.
The discovery of human remains is always a possibility during ground disturbing activities
extending
at least several feet into the ground surfa
ce
. If human remains are found, the State of California
Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Secti
on 5097.98. In the event of an unanticipated discovery of human remains, the County Coroner must be notified immediately. If the human remains are determined to be prehistoric, the Coroner will notify the NAHC, which will determine and notify a most likely
descendant (MLD). The
MLD has 48 hours to make recommendations for the disposition of the remains. The MLD has 48 hours from being granted site access to make recommendations for the disposition of the remains.
If the MLD does not make recommendations wit
hin 48 hours, the landowner shall reinter the
remains in an area of the property secure from subsequent disturbance.
The proposed project would not involve construction or
excavation
activities within the western
component of the project site. The propose
d project would have no impacts on
potential human
remains, if present, within the
western component of the project site.
Construction within the eastern component of the project site would require ground disturbance to several feet or more below ground su
rface, such as grading for relocation of the San Francisco Bay Trail, utility connections for the industrial building, or drilling for the displacement pier supports for the building foundation. These project activities would have potential to encounter an d disturb
unknown or previously undiscovered human remains, since this is usually a possibility regardless of City of Hayward
4350
Point Eden Way Industrial Development Project
4.2 -
12 project or location. However, mandatory adhere to existing regulations to protect human remains, such as Public Resources Code Section 5097.98 wou
ld prevent significant impacts. Impacts would be
less than significant.
Mitigation Measures
N
o mitigation measures are indicated
.
Significance After Mitigation
Impacts would be less than significant without mitigation .
4.2.4 Cumulative Impacts
The cumulative i
mpacts assessment area for cultural resources consists of the project site, including both the western and eastern components of the project site. The project site was determined to be
appropriate because implementation of the proposed project would result in no structural demolition or ground disturbance or associated potential to impact buried cultural resources beyond the boundaries of the project site. Likewise, historic resources o n the project site occur
solely on the project site and not within the sites of other cumulative projects, list in Table 3 -
1 in
Section 3,
Environmental Setting
.
There are no other ongoing or reasonably foreseeable future projects within the project site
other
than the proposed project. Potential impacts to cultural resources associated with implementation of the proposed project are described above.
Implementation of the proposed project would result
in significant and unavoidable impacts to historic reso urces associated with demolition of the
former Oliver Brothers Salt Company structure and alterations to salt evaporation ponds within the eastern component of the project site. The proposed project would have no impacts to historic resources located elsew
here in the City because project activities would be limited to the project site. However, because the proposed project would result in direct significant impacts to historic resources on the project site, there would be fewer historic resources remaining in the City, and the
cumulative impact would be significant and unavoidable.
Within implementation of mitigation
measures CUL
-
1a and CUL
-
1b, impacts would be
reduced, but would remain significant and
unavoidable.
The reasonably foreseeable future projects
listed in Table 3
-
1 of Section 3,
Environmental Setting
,
would require ground disturbance and excavation during construction.
Ground disturbance and
excavation activities would have the potential to encounter previously unidentified or unknown subsurface c
ultural resources. Construction of the proposed project would also require excavation and result in the same potential to encounter or damage subsurface resources. However, implementation of Mitigation Measure CUL
-
2 would be required and would reduce impac
ts to less
than significant.
Other projects would undergo environmental review with the City as lead agency, and mitigation would be required to reduce or avoid significant impacts, similar to the proposed project. Therefore, there would be no significant
cumulative impacts to archaeological resources
and human remains.
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
1 4.3
Hazards and Hazardous Materials
This section evaluates the potential
impacts relating to hazards and hazardous materials
associated
with the proposed project
.
4.3.1 Setting
a.
Project Site
A Phase I Environmental Site Assessment (ESA) was prepared for the project site by Cornerstone Earth Group in March 2017. The Phase I ESA is incl
uded as Appendix
E
to
the
Initial Study
, and
the
Initial Study is included as Appendix A to this EIR. The Phase I ESA
focuses on the eastern component
of the project site
. According the Phase I ESA,
a salt production and processing facility
, known as
Olive
r Brothers Salt Works,
operated on
the east component of
the project site until approximately
1981. The salt facility consisted of a processing plant and a shop, both of which were on the eastern component of the project site. The shop has since been demo lished. A salt pile or heap was located
south of the plant on the eastern component of the site, as were salt rinsing ponds. The salt pile is no longer present, but the former salt ponds remain.
Former salt ponds are also located on the
western component o
f the project site. Railroad tracks were used to transport salt between ponds and the processing plant. Much of the track system no longer remains, but some evidence, such as old railroad ties and spikes
,
can still be found on
-
site. A gasoline
-
powered loco
motive was
reportedly used to move railroad cars along the tracks, and an underground storage tank and associated pump were reportedly located next to the railroad track south of the shop, on the eastern component of the site. According to the Phase
I
ESA,
the gasoline tank had capacity for
approximately 100 gallons. Additionally, a 500
-
gallon underground storage tank with diesel fuel was
also on
-
site and
associated with the former salt production operations. Both underground storage tanks were removed in 1
998. Petroleum
-
related contamination
was
detected in underlying soil and
groundwater after the tanks were removed. Subsequent remedial activities were conducted through 2008. Soil sampling conducted in 2013 indicated there were additional areas outside of the
remediated areas where elevated concentrations of contaminants of potential concern remain. In addition,
elevated
concentrations of contaminants of potential concern were also detected in samples collected from temporary soil vapor probes in 2012, and in groundwater monitoring well
samples collected in 2013.
The contaminants of potential concern consist
ed
primarily of benzene,
TPHo, and 1,2
-
DCA. Additionally,
the
groundwater
sampling in 2013 revealed residual
concentrations of TPH
-
G
and BTEX
that exceed
ESL and/or MCL thresholds.
The potential for residual petroleum contamination is the only Recognized Environmental Condition identified
in the Phase I ESA. Additionally, a
Risk Management Plan (RMP) prepared for the project
site in 2014 identifies residual petroleum hydrocarbons as a concern within soil and groundwater.
According to the RMP, the project site
is acceptable for redevelopment without restrictions
except
for two areas on the eastern component of the site where residual petroleum hydrocarbons remain within soil and ground
water.
These two areas are referred to as the restricted areas
and are shown
on Figure 4.3
-
1 .
B
enzene concentrations in groundwater beneath the
restricted
areas
and in an area
slightly beyond the restricted areas
exceed the commercial non
-
drinking water Environmental
Screening Level (ESL) of 27 parts per billion (ppb) set by the RWQCB, which was established based on potential vapor intrusion to indoor air situati
ons.
The extent of benzene contamination
exceeding ESL in groundwater is shown on Figure 4.3
-
2. City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
2 Figure
4.3 -
1 Restricted Areas
Source: ASE 2014
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
3 Figure
4.3 -
2 Extent of Benzene Exceeding ESLs in Shallow Groundwater
Source: ASE 2014
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
4 The
RMP
, which is provided as an Appendix to the Phase I ESA,
provides general protocols for
managing soil and groundwater at the site; recommendations for soil vapor mitigations for future structures; and restricted areas where detectable concentrations of c ontaminants of potential
concern may be present. On December 23, 2014, a deed restriction was recorded with Alameda County. The deed restriction identified that the project site was contaminated by petroleum products, and requires the following:
Property m
ust be used consistent with the 2014 RMP
Inhabited structures built on
-
site must be compliant with the RMP
Excavation on
-
site must be compliant with the RMP
Future uses on
-
site must preserve integrity of cap, vapor barrier, or installed ventilation systems
No water wells may be installed on
-
site unless approved by the State Water Resources Control Board
The State Water Resources Control Board must be notified if the integrity of cap, vapor barrier, or installed ventilation systems is compromised
The State Water Resources Control Board granted case closure for the project site on February 18, 2015. However, the State Water Resources Control Board noted that the case does not meet all criteria of the low
-
threat closure policy, but no further action
was still appropriate
because
:
The contamination plume is defined and on
-
site
The exposure pathways have been defined and assessed
Pollutant sources have been reportedly removed or remediated
Groundwater contamination plumes appear to be decreasing
Risk ma
nagement measures appear appropriate
The State Water Resources Control Board noted that “there may be residual petroleum -
contaminated soil and groundwater at the site that could pose an unacceptable risk as a result of future construction/development activ
ities” and “proper management may include sampling risk assessment, additional cleanup work, mitigation measures, or some combination of these tasks.”
b.
Asbestos and Lead
-
Based Paint
The
Phase I ESA also indicates that existing on
-
site structures
associated
with the former Oliver
Brothers Salt Works operation
may contain asbestos due to their age. These structures may also contain lead
-
based paint. Both asbestos and lead are harmful to human health.
c.
Off
-
site Sources of Contamination
According to the Phase I
ESA, there are 11 sites within approximately 0.25 mile of the project site (see Appendix
E of the Initial Study
). None of these sites are listed as active contamination cases, and some are noted to generate hazardous waste but have no known contamination a ssociated
with them. One of the 11 sites, located at 4125 Breakwater Avenue , approximately 0.1 mile to the
north of the eastern component of the project site,
and known as “Big Al’s Waste Hauling,” is noted
to have potential contamination requiring evaluat
ion.
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
5 4.3.2
Regulatory Setting
a.
Federal Regulations
Toxic Substances Control Act (1976) and the Resource Conservation and Recovery Act of 1976 (RCRA)
These acts
established a program administered by the USEPA for the regulation of the generation, transportation, treatment, storage, and disposal of hazardous waste. RCRA was amended in 1984 by the Hazardous and Solid Waste Act, which affirmed and extended the “cradle to grave” system of regulating hazardous wastes. Among other things, the use of cert ain techniques for the disposal of
some hazardous wastes was
specifically prohibited by the
Hazardous and Solid Waste Act
.
Comprehensive Environmental Response, Compensation and Liability Act, amended by the Superfund Amendments and Reauthorization Act (1 986)
This law was enacted in 1980 and provides broad federal authority to respond directly to releases or threatened releases of hazardous substances that may endanger public health or the environment.
Among other things, Comprehensive Environmental Respo
nse, Compensation and Liability Act
(CERCLA) established requirements concerning closed and abandoned hazardous waste sites, provided for liability of persons responsible for releases of hazardous waste at these sites, and established a trust fund to provi
de for cleanup when no responsible party could be identified.
CERCLA also enabled revision of the National Contingency Plan, which provided the guidelines and procedures needed to respond to releases and threatened releases of hazardous substances, polluta
nts, or contaminants. The National Contingency Plan
also established the National Priorities
List.
Federal Insecticide, Fungicide, and Rodenticide Act
This Act (7 U.S. Code [USC] 136 et seq.) provides Federal control of pesticide distribution, sale, and u
se. The USEPA was given authority under the Act to study the consequences of pesticide usage, and to require users (farmers, utility companies, and others) to register when purchasing pesticides.
Later amendments to the law required users to take exams for
certification as applicators of
pesticides. All pesticides used in the United States must be registered (licensed) by the USEPA.
Registration assures that pesticides will be properly labeled and that, if used in accordance with specifications, they will n
ot cause unreasonable harm to the environment.
Lead
-
Based Paint
Regulations
Regulations for Lead
-
Based Paint (LBP) are contained in the Lead
-
Based Paint Elimination Final Rule
,
24 CFR 33, governed by the U.S. Housing and Urban Development (HUD), which requires sellers and lessors to disclose known LBP and LBP hazards to perspective purchasers and lessees. Additionally, all LBP abatement activities must be in compliance with Cali fornia
Occupational Safety and Health
Administration (Cal/OSHA)
and Federal OSHA and with the State of California Department of Health Services requirements. Only LBP
-
trained and
-
certified abatement personnel are allowed to perform
abatement activities. A
ll LBP removed from structures must be hauled and disposed of by a transportation company licensed to transport this type of material at a landfill or receiving facility licensed to accept the waste.
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
6 Regulations to manage and control exposure to lead
-
based
paint are
also
described in CFR Title 29,
Section 1926.62 and C
alifornia
C
ode of
R
egulations
Title 8 Section 1532.1. These regulations cover
the demolition, removal, cleanup, transportation, storage, and disposal of lead -
containing material.
The regulatio
ns outline the permissible exposure limit, protective measures, monitoring, and compliance to ensure the safety of construction workers exposed to lead -
based materials.
Cal/OSHA’s Lead in Construction Standard requires project proponents to develop and imp lement a
lead compliance plan when lead
-
based paint would be disturbed during construction. The plan must describe activities that could emit lead, methods for complying with the standard, safe work practices, and a plan to protect workers from exposure to
lead during construction activities.
Cal/OSHA requires 24
-
hour notification if more than 100
sf
of lead
-
based paint would be disturbed.
U.S. Environmental Protection Agency
The USEPA is the agency primarily responsible for enforcement and implementation o f Federal laws
and regulations pertaining to hazardous materials. Applicable Federal regulations pertaining to hazardous materials are contained in the CFR Titles 29, 40, and 49. Hazardous materials, as defined in the CFR, are listed in 49 CFR 172.101. The
management of hazardous materials is governed by the
following laws:
1. Resource Conservation and Recovery Act of 1976) (42 USC 6901 et seq.); Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (also called the Superfund Act) (42 U
SC 9601 et seq.)
2. Federal Insecticide, Fungicide, and Rodenticide Act (7 USC 136 et. Seq.)
3. Superfund Amendments and Reauthorization Act of 1986 (Public Law 99 499)
These laws and associated regulations include specific requirements for facilities that gene rate, use,
store, treat, and/or dispose of hazardous materials. USEPA provides oversight and supervision for Federal Superfund investigation/remediation projects, evaluates remediation technologies, and develops hazardous materials disposal restrictions an
d treatment standards.
Asbestos
Regulations
Asbestos is a naturally occurring fibrous material that was extensively used as a fireproofing and insulating agent in building construction materials before such uses were banned by the US
EPA in
the 1970s. Asbes
tos
-
containing materials (ACMs) were commonly used for insulation of heating ducts as well as ceiling and floor tiles
. Undisturbed
ACMs contained within building materials
present no significant health risk because there is no exposure pathway. However, on ce these tiny
fibers are disturbed, they can become airborne and become a respiratory hazard. The fibers are very small and cannot be seen with the naked eye. Once they are inhaled, they can become lodged into the lungs, and may cause cancer, lung disease
or other pulmonary complications.
The USEPA regulations under Title 40 CFR Part 61 regulate the removal and handling of ACMs. The statute is implemented by the Monterey Bay Air Resources District (MBARD). The federal Occupational Safety and Health Administ
ration also has a survey requirement under Title 29 CFR that is implemented by Cal/OSHA under Title 8 California Code Regulations. These regulations require facilities to take all necessary precautions to protect employees and the public from exposure to a
sbestos.
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
7 b.
State Regulations
Department of Toxic Substances Control
As a department of the California EPA, the Department of Toxic Substances Control (DTSC) is the primary agency in California that regulates hazardous waste, cleans up existing contamination,
and
looks for ways to reduce the hazardous waste produced in California. DTSC regulates hazardous waste in California primarily under the authority of RCRA and the California Health and Safety Code.
DTSC also administers the California Hazardous Waste Con trol Law (HWCL) to regulate hazardous
wastes. While the HWCL is generally more stringent than RCRA, until the USEPA approves the California program, both state and federal laws apply in California. The HWCL lists 791 chemicals and approximately 300 common
materials that may be hazardous; establishes criteria for identifying, packaging, and labeling hazardous wastes; prescribes management controls; establishes permit requirements for treatment, storage, disposal, and transportation; and identifies some waste
s that cannot be disposed of in landfills.
Government Code Section 65962.5 requires the DTSC, the State Department of Health Services, the SWRCB, and CalRecycle to compile and annually update lists of hazardous waste sites and land designated as hazardous
waste sites throughout the state. The Secretary for Environmental Protection consolidates the information submitted by these agencies and distributes it to each city and county where sites on the lists are located. Before the lead agency accepts an applic ation for
any development project as complete, the applicant must consult these lists to determine if the site at issue is included.
If any soil is excavated from a site containing hazardous materials, it would be considered a hazardous waste if it exceed
ed specific criteria in Title 22 of the California Code of Regulations.
Remediation of hazardous wastes found at a site may be required if excavation of these materials is performed, or if certain other soil disturbing activities would occur. Even if soil or groundwater at a
contaminated site does not have the characteristics required to be defined as hazardous waste, remediation of the site may be required by regulatory agencies subject to jurisdictional authority.
Cleanup requirements are determined on a
case
-
by
-
case basis by the agency taking jurisdiction.
Hazardous Waste Control Act
The hazardous waste management program enforced by DTSC was created by the Hazardous Waste Control Act (California Health and Safety Code Section 25100 et seq.), which is im plemented by
regulations described in CCR Title 26. The State program is similar to, but more stringent than, the Federal program under RCRA. The regulations list materials that may be hazardous, and establish criteria for their identification, packaging,
and disposal. Environmental health standards for
management of hazardous waste are contained in California Code of Regulations (CCR) Title 22, Division 4.5. As required by California Government Code Section 65962.5, DTSC maintains a Hazardous Waste and Sub
stances Site List for the State called the Cortese List.
California Department of Pesticide Regulation, Department of Food and Agriculture, and the Department of Public Health
The California Department of Pesticide Regulations (DPR), a division of Californ ia Environmental
Protection Agency, in coordination with the California Department of Food and Agriculture, a division of Measurement Standards and the California Department of Public Health have the primary responsibility to regulate pesticide use, vector
control, food, and drinking water safety. CCR
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
8 Title 3 requires the coordinated response between the County Agricultural Commissioner and the Sonoma County Department of Health Services to address the use of pesticides used in vector control for animal and
human health on a local level. DPR registers pesticides; the County tracks pesticide use. Title 22 is used also to regulate both small and large California Department of Public Health water systems.
California Fire Building Code
The 2016 Fire and Building Code (2016) establishes the minimum requirements consistent with nationally recognized good practices to safeguard the public health, safety, and general welfare for the hazards of fire, explosion,
or dangerous conditions in new and existing buildings, structures and premises, and to provide safety and assistance to firefighters and emergency responders during emergency operations. The provisions of this code apply to the construction, alteration, mo vement
enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal, and demolition of every building or structure or any appurtenances connected or attached to such building structures throughout the State of California.
c.
Local
Regulations
Alameda
County
Local
Hazard Mitigation Plan
The
Alameda
County
Local
Hazard Mitigation Plan
assesses hazards, risks, and capabilities for hazard
mitigation, and then provides a blueprint for a mitigation strategy.
The hazard and risk assessment
focuses on
dam failure inundation, drought,
earthquake, flood, landslide,
liquefaction, tsunami, and
w
ildfire.
The Alameda County 2016 Local Hazard Mitigation Plan was adopted by the County Board of Supervisors in January 2016, and was approved by FEMA in October 2016.
Alameda
County
Department of
Environmental Health
The
mission of the
Alameda County Dep
artment of Environmental Health (ACDEH) is to protect the health, safety and well
-
being of the public through the promotion of environmental quality.
The
department
’s Hazardous Materials Division contains the Clean Water Program, Waste Tire Program, and th
e Certified Unified Program Agency (CUPA).
Alameda County
Water Department (ACWD)
The Alameda County Water District (ACWD) manages the Niles Cone Groundwater Basin, which underlies the project site, through comprehensive programs that protect and improve water
supplies for groundwater users. The project site is also locate d
within ACWD’s jurisdictional
boundary. ACWD is identified within the Sustainable Groundwater Management Act (SGMA) as the exclusive local agency within its statutory boundaries to compl y with SGMA with its boundaries.
ACWD is also the Groundwater Sustainability Agency for the Niles Cone Groundwater Basin and has an approved Alternative to a Groundwater Sustainability Plan.
City of Hayward General Plan
The Hazards Element of the City of H
ayward General Plan
defines hazardous materials and provides
the following information:
Hazardous materials are toxic, ignitable, corrosive, or reactive substances that can cause harm to people.
Hazardous materials are used by households and businesses wi thin urban
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
9 areas.
The improper use and disposal of hazardous materials can contaminate soil and groundwater resources and compromise the health and quality of life of residents.
Accidents
involving the transportation of hazardous materials can also cause
explosions or spills that
endanger the lives and property of nearby residents and businesses.
The
Hazards Element of the
City of Hayward
General Plan
includes the following goals and policies
that
aim to reduce potential damage from hazardous materials:
Goal HAZ
-
6 : Protect people and environmental resources from contaminated hazardous material sites and minimize risks associated with the use, storage, transport, and disposal of hazardous materials
.
HAZ
-
6.2 :
The City shall require site
investigations to determine the presence of hazardous
materials and/or waste contamination before discretionary project approvals are issued by the City. The City shall require appropriate measures to be taken to protect the health and safety of site user
s and the greater Hayward community.
HAZ
-
6.7 :
The City shall coordinate with State, Federal, and local agencies to develop and promote best practices related to the use, storage, transportation, and disposal of hazardous materials.
G
oal
HAZ
-
6 and its suppo
rting policies are designed to establish strategies to minimize exposure to hazardous materials through the documentation, monitoring, clean -
up, and re
-
use of hazardous
material sites; and the implementation of best practices for the routine use, storage, transport, and
disposal of hazardous materials.
4.3.3 Impact Analysis
a.
Methodology and Thresholds of Significance
According to
CEQA Guidelines
Appendix G, impacts related to
hazards
and
hazardous materials
are
considered significant if implementation of the proposed project would:
1. Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials
;
2. Create a significant hazard to the public or t
he environment through reasonably foreseeable
upset and accident conditions involving the release of hazardous materials into the environment
;
3. Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one
-
quar
ter mile of an existing or proposed school
;
4. Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would create a significant hazard to the public or the environm
ent
;
5. For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles
of a public airport or public use airport, result in a safety hazard
or
excessive noise
for people residing or working in the project ar
ea
;
6. Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan
; or
7. Expose people or structures
, either directly or indirectly,
to a significant risk of loss, injury, or
death involving wildland fir
es
.
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
10 CEQA checklist items
1 ,
3 , and
5 through 7
were found to be less than significant in the Initial Study
(Appendix
A
)
.
Therefore, no further analysis is warranted, and these t opics
will not be discussed
further in this section.
Threshold
2 :
Would the project
c
reate a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the e
nvironment
?
Impact HAZ
-
1 T
HE PROJECT
HAS THE POTENTIAL TO
CREATE A SIGNIFICANT HAZARD TO THE PUBLIC OR
THE ENVIRONMENT THROUGH REASONABLY FORESEEABLE UPSET AND ACCIDENT CONDITIONS INVOLVING THE
RELEASE OF HAZARDOUS MATERIALS INTO THE ENVIRONMENT
DUE TO POTENTIAL HAZARD
OUS MATERIALS THAT
MAY BE PRESENT IN THE EXISTING ON
-
SITE STRUCTURES
.
T
HIS IMPACT WOULD BE
POTENTIALLY
SIGNIFICANT
BUT
MITIGABLE
.
The proposed project would preserve the western component of the project site as it currently exists. No construction activiti
es or ground disturbance would occur within the western component of the project site. Additionally, no operational activities would occur within the western component of the project site.
There are no on
-
site structures or known contamination on the
weste
rn component of the project site
.
B
ecause the project would
not involve
activities or
occupancy
on
the western component, the proposed preserve would have no potential to create a significant hazard to the public or environment.
Due to the age of the
form
er Oliver Brothers Salt Works
structures
on the eastern component of the
project site
, they
could
contain LBP and/or ACM (
see Phase I ESA included as
Appendix
E to the
Initial Study
).
Project construction would include demolition of the existing structures. During demolition, LBP and/or ACM, if present could become mobilized as dust or directly handled by construction workers.
Exposure to lead can cause adverse health
effects, including
disturbance of
the
gastrointestinal system, anemia, kidney disease, and neuromuscular and neurological dysfunction (in severe cases).
Lead
-
based paint and other lead
-
containing materials associated with
the
proposed project
would be
required to be
handled
in compliance with Cal/OSHA regulations
regarding lead
-
based paints and materials. The California Code of Regulations, Section 1532.1, requires testing, monitoring, containment, and disposal of lead -
based paints and materials, such
that exposure levels do
not exceed Cal/OSHA standards. Compliance with
applicable
Cal/OSHA
regulations
would ensure impacts related to
LB
P would be
less than significant.
Friable ACMs are regulated as a hazardous air pollutant under the Clean Air Act , and the Bay Area
Air Qualit
y Management District (BAAQMD) regulates ACM in Regulation 11, Rule 2, which governs the proper handling and disposal of ACM for demolition activities . As a worker safety hazard, they
are also regulated under the authority of Cal/OSHA. In structures slated
for demolition, any ACMs
would be abated in accordance with
state
and
federal
regulations prior to the start of
demolition or
renovation activities and in compliance with all applicable existing rules and regulations.
However,
in order to ensure the prese
nce of asbestos is known, Mitigation Measure HAZ
-
1, which requires
a
demolition plan and
asbestos testing, would be required.
Adherence to these
regulatory
requirements
if asbestos is detected
would ensure that asbestos removal would not result in the rele
ase of hazardous materials to the environment that could impair human health. Therefore, the impact related to ACMs would be less than significant
with mitigation
implemented
.
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
11 Mitigation Measures
HAZ
-
1 Project
Demolition
Activities
In conformance with Sta
te and local laws, a visual inspection/pre
-
demolition survey, and possible
sampling, shall be conducted prior to the demolition of on -
site building(s) to determine the
presence of asbestos
-
containing materials (ACMs) and/or lead
-
based paint (LBP). Document
ation of
the survey shall be provided to the City prior to commencement of demolition activities.
During demolition activities, all building materials containing lead -
based paint shall be removed in
accordance with Cal/OSHA Lead in Title 8, California Code
of Regulations (CCR), Section 1532.1,
including employee training, employee air monitoring, and dust control. Any debris or soil containing lead
-
based paint or coatings shall be disposed of at landfills that meet acceptance criteria for the type of lead b
eing disposed.
All potentially friable asbestos containing materials (ACMs) shall be removed in accordance with National Emission Standards for Air Pollution (NESHAP) guidelines prior to demolition or renovation activities that may disturb ACMs. All
demolition activities shall be undertaken in accordance with Cal/OSHA standards contained in Title 8, CCR, Section 1529, to protect workers from asbestos exposure.
A registered asbestos abatement contractor shall be retained to remove and dispose of ACMs i
dentified in the asbestos survey performed for the site in accordance with the standards stated above in this mitigation measure. Materials containing more than one -
percent asbestos are also
subject to Bay Area Air Quality Management District (BAAQMD) regu lations. Removal of materials
containing more than one
-
percent asbestos shall be completed in accordance with BAAQMD requirements and notifications.
Based on Cal/OSHA rules and regulations, the following conditions shall be implemented
to limit
impacts to
construction workers
:
Prior to commencement of demolition activities, a building survey, including sampling and testing, shall be completed to identify and quantify building materials containing lead -
based
paint.
During demolition activities, all
building materials containing lead
-
based paint shall be removed
in accordance with Cal/OSHA Lead in Construction Standard, Title 8, CCR, Section 1532.1, including employee training, employee air monitoring and dust control.
Any debris or soil containing le
ad
-
based paint or coatings shall be disposed of at landfills that meet acceptance criteria for the type of waste being disposed.
Significance After Mitigation
Mitigation Measure HAZ
-
1 would reduce impacts by requiring
testing
to indicate
whether
lead
-
based
paint or
asbestos is present in the structures slated for demolition. If lead or
asbestos is
detected,
these materials
would be abated in accordance with state, federal, and local regulations to ensure
they would not
be released to the environment or impa
ir human health.
Threshold
4 :
Would the project be located on a site that is included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the env ironment?
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
12 Impact HAZ
-
2 T
HE PROJECT
W
OULD
INVOLVE
DEVELOPMENT
ON A SITE THAT IS INCLUDED ON A LIST OF
HAZARDOUS MATERIAL SITES COMPILED PURSUANT TO
G
OVERNMENT
C
ODE
S
ECTION
65962.5
,
AND DUE TO
THE POTENTIAL TO ENCOUNTER RESIDUAL SOIL AND GROUNDWATER CONTAMINATION
ON THE
EASTERN
COMPONENT OF THE PROJECT SITE
,
IMPACTS WOULD BE POTENTIALLY SIGNIFICANT BUT MITIGABLE
.
Project Construction
The western component
of the project site
is not located on a site listed on Government Code
Section 65962.5
. Additionally
,
the proposed
project would not involve ground disturbance or
operational activities
on the western component of the site. Therefore, there
would be no
potential
for a signif
icant hazard to the public as a result of the proposed preserve on the western component of the project site.
The
eastern component of the
project site is included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5 a
s a result of leaking underground storage tanks that
were once present on the eastern component of the project site, as described in Section 4.3.1 above. Remediation after removal of the tanks has resulted in less on -
site contamination hazard,
and the Stat
e Water Resources Control Board granted case closure for the project site on February 27 , 2015.
In the closure letter, SWRCB notes
that there may be residual contamination, and that
therefore contractors performing subsurface activities should be prepared to encounter soil and
groundwater contaminated with petroleum hydrocarbons, and that if encountered, it must be properly managed. To address this, a Risk Management Plan ( RMP
) was prepared
.
The R
M
P identifies two areas within the eastern component of the project site where residual
contamination levels are of concern.
These areas are referred to as the restricted areas and are shown on Figure 3 of the RMP.
Soil within the
restricted
areas could contain detectable
concentrations of TPH
-
G, TPH
-
D, and BTEX. T
hese compounds are referred to as chemicals of
potential concern (COPCs). In addition, COPCs are present at moderate concentrations in groundwater in a slightly larger area surrounding the
restricted
areas.
According to the RMP,
elevated concentrations of
the COPCs in soil could be encountered during construction activities at depths of 5
-
feet below ground surface or deeper, within the
restricted
areas on the eastern
component of the project site.
Therefore, project construction activities involving excavat ion to approximately 5 feet below ground
surface, such as construction of the proposed building foundation or buried utility connections ,
could disturb contaminated soils or groundwater and expose construction workers. Because c
ontaminated soils generally
exist on
-
site at depths greater than 5 feet below ground surface ,
o
ther
shallow ground disturbance during project construction, such as relocating the segment of the San Francisco Bay Trail
,
would have
less
potential to disturb contaminated soils and expos
e construction
workers to contamination.
Nonetheless, the potential for construction workers to be exposed to contaminated soil or groundwater during project construction would be a potentially significant but mitigable impact.
Mitigation Measure HAZ
-
2a wo
uld reduce this impact to a less than significant
level.
Likewise
,
project
construction would generate dust. If soils from the contamination areas are stockpiled on site and become airborne dust, either from wind erosion or construction equipment, off
-
site
receptors could be exposed, as well as project construction workers. Reuse of contaminated soils as fill material on site could also expose workers to contamination, as well as future employees
of the industrial building or people using the San Francisco Bay Trail. Impacts would be potentially
significant but mitigable.
Mitigation Measure HAZ
-
2a would reduce this impact to a less than
significant level.
Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
13 The proposed industrial building would be constructed atop the restricted
areas on the eastern
component
of the project site. The building would be constructed using pursuant to recommendations of the
Geotechnical
Engineering Services
Report prepared by
Professional
Services Industries, Inc., an Intertek company,
in
January 2018 for the project. Mitigation Measure
GEO
-
1 in the Initial Study (see Appendix A) requires that recommendations of the geotechnical report be incorporated into the project design and construction. The geotechnical report includes the use of disp
lacement piers to support the foundation of the proposed industrial building.
Displacement piers use a hollow mandrill that is filled with crushed rock that is vibrated into the ground to a preselected depth and is then raised and lowered, while vibrating,
to densify the gravel
and the surrounding soils. This produces a column of compacted gravels and increases the density of the surrounding soils.
The column of gravel created from displacement piers would create a potential
pathway
for migration of contami
nated groundwater plume to aquifers at depths of up to
20 feet below ground surface, as that is the recommended depth of the piers for the project. Due to the site’s proximity to the bay, the displacement piers may also create a preferential pathway for gr
oundwater associated with sea level rise, as the piers would displace lower permeable materials (e.g., clays and silts). Migration of the
groundwater
contamination plume into aquifers would be
potentially significant but mitigable.
Mitigation Measure HAZ
-
2 c would reduce this impact to a less
than significant level.
Project Operation
The proposed industrial building would be constructed atop the restricted
areas on the eastern
component of the project site.
During project operation, vapors from contaminated
soil and
groundwater could potentially infiltrate the proposed industrial building, including spaces within the
building wher
e employees would be routinely present. The accumulation of vapors in the breathing zone inside the building could present a potent
ial hazard to human health. Therefore, the potential
for soil vapor intrusion during operation would be a potentially significant but mitigable impact.
Mitigation Measure HAZ
-
2a would reduce this impact to a less than significant level.
Some stormwater run
off from impervious surfaces of the project would be directed to bioretention areas. The bioretention areas would slow runoff and aid infiltration in order to reduce the amount of runoff discharge to the storm drain system. However, if improperly designed,
the bioretention
areas could result in contaminant
s
leaching from soil into groundwater or result in migration of the existing contamination plume within groundwater.
At least one of the proposed bioretention swales
would be located partially within the r
estricted areas.
Migration or leaching of contamination would
be a potentially significant environmental impact, but mitigable.
Mitigation Measure HAZ
-
2b would
reduce this impact to a less than significant level.
Mitigation Measures
HAZ
-
2a
Implementation
o
f the RMP
The project shall implement the appropriate handling procedures and worker health and safety measures during excavating or dewatering activities, as well as the use of an engineered vapor
barrier as described in the site
-
specific RMP
developed fo
r the project in 2014. The RMP is an
appendix to the Phase I ESA. The Phase I ESA is
included as Appendix
E
to
the Initial Study, which is
provided as Appendix A to
this EIR
.
Measures included in the RMP to control potential hazardous contamination and exp
osure include
,
but are not limited to the following:
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
14
Construction contractors shall implement dust control mitigation measures during construction activities at the project site to minimize the generation of dust. Examples of dust control measures that sha
ll be implemented include limiting construction vehicles speeds to 5 miles per hour when on
-
site; routinely applying water to exposed soils while
performing excavation activities; and, covering soil stockpiles with plastic sheets at the end of each workday
. Additional dust control measures shall be implemented by the selected contractor, as necessary, especially if windy conditions persist during site grading and excavation. These measures may include moisture, conditioning the soil, using dust suppressants
, or covering the exposed soil and stockpiles with weighted plastic sheeting to prevent exposure of the soil.
To prevent or minimize construction equipment from tracking polluted spoils off the site onto roadways, construction equipment that contacts soils
deeper than 5
-
feet below
ground surface shall be decontaminated prior to leaving the site. Decontamination methods shall include brushing and/or vacuuming to remove loose dirt on vehicle exteriors and wheels. In the event that these dry decontamination me
thods are inadequate, methods
such as steam cleaning, high pressure washing, and cleaning solutions shall be used, as necessary, to thoroughly remove accumulated dirt and other materials. Decontamination activities shall be performed in an on
-
site decontam
ination facility established by the
contractor.
All project construction workers performing construction activities at depths below 5 -
feet
below ground surface in the restricted areas shall adhere to decontamination procedures when exiting the area. Decont
amination measures shall include: (a) vacuuming the surface of coveralls, head covers, and footwear to remove accumulated soil particles and changing into other clean clothes if practical; (b) vacuuming or washing small tools, hand tools, or personal equip
ment to remove accumulated soil particles; and, (c) placing work clothes and personal equipment in sealed plastic bags or other suitable containers for transportation or on
-
site storage.
In the event that disturbed soil appears to contain contaminants of potential concern (COPCs), such as odors, staining, and/or discoloration, work should halt in that area and an environmental professional (EP), such as a geologist, engineer, industrial hy gienist, or
environmental health specialist with expertise in these matters, shall be called to the site to oversee the work and determine safe construction and soil handling procedures.
The EP shall be present on
-
site during excavations greater than 5
-
fe
et below ground surface
in the restricted areas to observe field conditions and measure hydrocarbon vapors using a hand held photoionization detector (PID).
If
PID readings are measured in a specific area
showing concentrations in excess of construction wo
rker screening levels published by the
Regional Water Quality Control Board (RWQCB), construction activities in that area shall halt until appropriate risk mitigation measures are implemented. If necessary, HAZWOPER trained personnel shall be called to the
site to complete the construction activities in that
area.
Soil excavated from deeper than 5
-
feet b
elow ground surface
in the restricted area sh
all
only be
reused on
-
site as backfill after sampling and analysis soil proves the soil is acceptable to remain
on site.
C
ommercial ESLs
shall be used as the threshold to
determine if
soils may remain
on site or require off
-
site disposal. All appropriate regulatory sampling
methods, holding times,
and detection limits shall be followed.
A health and safety plan sha
ll be developed and implemented for project construction that incorporates measures and procedures
to minimize direct contact by construction workers
with site groundwater, particularly in the restricted areas. The health and safety plan shall Environmental Impact Analysis
Hazards and Hazardous Materials
Draft Environmental Impact Report
4.3 -
15 be approved
by either the City or the RWQCB, or both as applicable, prior to excavation activities.
If groundwater is encountered within the former remediation area during construction of the project, as shown on Figure 4 of the RMP, an EP shall be called to the site to determine
safe handling procedures. The groundwater shall be pumped into appropriate containers and samples shall be obtained for chemical analysis of the COPCs in accordance with a site sampling plan and the requirements of the waste disposal facility to which the material is
sent. If water sample analytical results indicate the water is free of all detectable concentrations of COPCs, such water can be re
-
used at the site if deemed appropriate by
Alameda County and the RWQCB. If water sample analytical results indicate the water
contains concentrations of COPCs above appropriate RWQCB screening levels, such water shall not be re
-
used at the site. The contractor and the EP shall elect to: (a) treat the groundwater on
-
site to render it free of detectable c
oncentrations of COPCs (e.g. by
activated carbon filtration); or, (b) transport the groundwater to a local treatment or disposal facility for appropriate handling.
The proposed industrial building shall be constructed on top of a minimum of a 5 -
foot
bioatt
enuation zone within the restricted areas. This bioattenuation zone shall consist of a minimum of 5
-
feet of soil above the anticipated shallowest groundwater elevation, and the soil shall not contain total petroleum hydrocarbons greater than 100 parts per million.
An engineered vapor barrier shall be employed to further protect against possible vapor intrusion of COPCs into the proposed industrial building. The vapor barrier shall be designed to meet the needs of building. Vapor barriers are generally const ructed using membranes
constructed with high
-
density polyethylene (HDPE) or other polyolefin
-
based resins.
The
vapor barrier shall be resistant to VOCs.
The vapor barrier shall meet the American Society
for Testing and Materials (ASTM) guideline for a vapo
r barrier and have a permeance rating
of 0.1 perms or less. The thickness and strength of the vapor barrier shall be based on the needs for the building, but the architect and contractor shall use a material strong enough to easily withstand the building c
onstruction and other building considerations. The selected vapor barrier shall be approved by the RWQCB prior to installation.
HAZ
-
2 b
Bioretention Design Coordination
The project applicant shall consult with
the City
on
location and/or
design of the on
-
si
te
bioretention basins to ensure protection of the groundwater basin, which may include ,
but is not
limited to
, locating the basins outside of the restricted areas or
use of a liner in the detention basin.
The final design and location of the on
-
site biore
tention basins shall demonstrate that groundwater
would be protected from contamination.
HAZ
-
2 c
Displacement Pier Design and Construction
The project applicant shall retain a geotechnical engineer to design the displacement piers for support of the
building foundation. The displacement piers shall be designed in a way to prevent creating a preferential pathway between shallow groundwater at approximately 5 feet below ground surface and deeper groundwater. The displace pier design developed by the geo technical
engineer shall be incorporated into project plans prior to commencement of construction. This mitigation measure shall apply to all displacement piers with in
the restricted areas
or the larger
area where benzene concentrations exceed ESLs, as sho
wn in Figure 4.3
-
2 of the EIR
. Additionally,
air
-
jetting
shall not be used to create the holes for the displacement piers within the restricted areas to avoid bringing subsurface soils to the ground surface.
City of Hayward
4350 Point Eden Way Industrial Development Project
4.3 -
16 Significance After Mitigation
With incorporation
of Mitigation Measure HAZ
-
2a
, the provisions of the RMP would reduce
potential hazardous materials impacts associated with the past on -
site contamination to a less than
significant level.
Mitigation Measures HAZ
-
2 b
and HAZ
-
2 c
would require coordination wi
th local
agencies to ensure that groundwater quality is protected and reduce the environmental impact associated with the existing contamination that may be affected by the bioretention basin and
that
the displacement piers
be designed and constructed to r
esult in
a less than significant
impact
.
4.3.4 Cumulative Impacts
A
project’s environmental impacts are “cumulatively considerable” if the “incremental effects of an individual project are significant when viewed in connection with the effects of past projects, the
effects of other current projects, and the effects of probable future projects” ( CEQA Guidelines
Section 15065[a][3]). The geographic scope for cumulative hazardous materials impacts is limited to projects within
Hayward that are west of Interstate 880
. This geographic scope is appropriate for
hazardous materials because risks associated with hazards and hazardous materials occur largely in a site
-
specific and localized context as a
dverse impacts from a hazardous materials release or spill diminish in m
agnitude with distance. Cumulative development in the vicinity of the
project site is
identified in Table 3
-
1. Continued urban development has the potential to increase exposure to hazards. However, overall, hazards and hazardous materials impacts associat ed with individual
developments are site specific in nature
and must be addressed on a case
-
by
-
case basis.
T
he
magnitude of hazards for individual projects would depend upon the location, type, and size of development and the specific hazards associated wi
th individual sites. Since hazards and hazardous
materials are required to be examined as part of the permit application and environmental review process, it is anticipated that potential impacts associated with individual projects will be adequately addre
ssed and mitigated prior to permit approval. Compliance with regulatory requirements would avoid potential hazard impacts associated with cumulative development .
With
adherence to existing policies and other local, regional, state, and federal regulations,
no significant
cumulative human
or environmental
health impacts are anticipated.
Environmental Impact Analysis
Transportation
Draft Environmental Impact Report
4.4 -
1 4.4
Transportation
This section analyzes impacts related to transportation. The analysis is based largely on the Transportation Analysis Memorandum
prepared by
Kittelson & Associates
and dated
January 27,
2021
. The
Transportation Analysis Memorandum
,
contained
in its
entiret
y in Appendix
C
to this EIR
,
provides
information relative to existing, existing plus project, future, and future plus project conditions based on project traffic volumes
and an analysis of vehicle miles traveled (VMT)
.
4.4.1 Setting
a.
Roadway Network
The
project
site is accessed
by vehicle
from Point Eden Way, primarily via Eden Landing Road and State Route 92. Point Eden Road and Eden Landing road are two
‐
lane undivided roadways with a
functional classification of local roadways in the City ’
s
General Plan Circulation Element. State Route
92 (SR
92) is a
six
‐
lane
f
reeway under the jurisdiction of the California Department of Transportation (Caltrans).
SR 92 is one of the primary routes used for access between East Bay and the Peninsula
in
the Sa
n Francisco Bay
.
Key intersections to access the site are the signalized intersection at Clawiter Road at SR ‐
92 e
astbound
r
amps, and the stop
‐
controlled intersections at Clawiter Road at SR
‐
92 w
estbound
r
amps, and at Eden Landing Road at Point Eden Way.
b.
Tr
ansit, Bicycle, and Pedestrian Facilities
The Alameda
-Contra Costa Transit District provides transit/bus service in the City of Hayward. The nearest AC Transit bus route to the project site is transit route 86. Route 86 begins at the Hayward Bart station a
nd travels west on Winton Avenue, south on Cabot Boulevard, and east on Depot Road. It then travels south on Industrial Boulevard and east on Tennyson Road before terminating at the South Hayward BART station. The nearest bus stop along route 86 is on Indu strial Boulevard at
Depot Road, approximately 1 mile from the project site.
There are no pedestrian sidewalk connections to the project site on Point Eden Way. Additionally, Point Eden Way contains no formal bicycle lanes. However, the San Francisco Bay Tr ail is located
along the eastern edge of the project site. The San Francisco Bay Trail is open to both pedestrian and bicycle travel and provides access through much of the Bay Area.
c.
Vehicle Miles Traveled
Vehicle miles traveled (VMT) is a measure used ext
ensively in transportation planning for a variety
of purposes. It measures the amount of travel for all vehicles in a geographic region over a given period of time, such as a 24
-
hour period or a one
-
year period. It is calculated as the sum of the
number of
miles traveled by each vehicle.
The City has calculated and mapped the existing or baseline VMT for each Transportation Analysis Zone (TAZ) or census block within the incorporated limits of Hayward.
According to the City’s GIS
portal,
the project site is
in a TAZ with an
existing
VMT of
18.23 per capita or employee
.
The regional
average VMT per employee is 18.15.
City of Hayward
4350 Point Eden Way Industrial Development Project
4.4 -
2 4.4.2
Regulatory Setting
a.
State Regulations
State Senate Bill
743
On September 27, 2013, California Governor Jerry Brown signed S enate Bill (S
B
)
743 into law and
started a process that changes transportation impact analysis as part of CEQA compliance. SB 743 requires
the Governor’s
Office of Planning and Research (OPR)
to identify new metrics for
identifying and mitigating transportation impacts w
ithin CEQA. In January 2018, OPR transmitted its
proposed CEQA Guidelines implementing SB 743 to the California Natural Resources Agency for adoption, and in January 2019 the Natural Resources Agency finalized updates to the CEQA Guidelines, which incorpor
ated SB 743 modifications. As of July 1, 2020, localities are required to rely on vehicle miles traveled (VMT), instead of traffic delay, as the primary metric for evaluating transportation impacts in CEQA documents. Under SB 743, automobile delay, as desc
ribed solely by
level of service or traffic congestion, shall not be
considered
a
significant
environmental impact
except for certain types of transportation projects
(
Public
Resource Code, § 21099 (b)(2)).
State CEQA Guidelines Section 15064.3
Originating
from SB 743, Section 15064.3 of the State CEQA Guidelines establishes vehicle miles traveled (VMT) as the most appropriate measure of transportation impacts, shifting away from the level of service analysis that evaluated a project’s impacts on traffic co nditions on nearby roadways
and intersections. The primary components of new section 15064.3 include:
Identifies VMT (amount and distance of automobile traffic attributable to a project) as the most appropriate measure of transportation impacts;
Declares t
hat a project’s effect on automobile delay shall not constitute a significant environmental impact except for projects increasing roadway capacity;
Creates a rebuttable presumption of no significant transportation impacts for (a) land use projects within o
ne
-
half mile of either an existing major transit stop or a stop along an existing high quality transit corridor, (b) land use projects that reduce VMT below existing conditions, and (c) transportation projects that reduce or have no impact on VMT;
Allows a
lead agency to qualitatively evaluate VMT if existing models are not available; and
Gives lead agencies discretion to select a methodology to evaluate a project’s VMT but requires lead agencies to document that methodology in the
environmental document prepared for the
project.
In December 2018, OPR issued a
Technical Advisory on Evaluating Transportation Impacts in CEQA
(OPR 2018). The technical advisory contains technical recommendations regarding assessment of VMT, thresholds of
significance, and mitigation measures. The technical advisory suggests a significance threshold for VMT that is based on state mandated GHG emission reduction targets.
The technical advisory recommends a quantitative per capita or per employee VMT that is
15 percent below that of existing development as a possible threshold of significance that would comply with the state’s long
-
term climate goals.
Environmental Impact Analysis
Transportation
Draft Environmental Impact Report
4.4 -
3 b.
Regional and
Local Regulations
Metropolitan Transportation Commission
The Metropolitan Transportation Commiss
ion (MTC) is designated by the State as the regional
transportation planning agency for the nine
-
county San Francisco Bay Area. MTC is responsible for
updating the Regional Transportation Plan (RTP), which plans the future transit, highway, roadway, railro
ad, bicycle and pedestrian facilities. MTC portions out federal funding to local agencies for transportation projects and determines their compliance with the Regional Transportation Plan.
Regional Transportation Plan and Sustainable Communities Strategy
MTC recently updated its RTP which was adopted by ABAG and MTC in July 2017. This new plan, 2040 Plan Bay Area, specifies how future transportation spending will occur through 2040. The new plan incorporates a California mandated Sustainable Communities St rategy. It also focuses on
reducing greenhouse gas emissions as it relates to transportation, per the requirements set out in the California Sustainable Communities and Climate Protection Act of 2008. Part of this effort includes the goal to increase non
-
a
uto mode share. Other main transportation goals of the plan include reducing vehicle operating and maintenance costs due to pavement conditions and reduce per
-
rider transit delay due to aged infrastructure.
Alameda County Transportation Commission
The Alam
eda County Transportation Commission (ACTC) coordinates transportation planning efforts throughout Alameda County and programs local, regional, State and federal funding for project implementation. It prepares the CMP, a program mandated by California law to describe the
strategies to address congestion problems on the CMP network, which includes state highways and principal arterials. The CMP requires analysis of Metropolitan Transportation System (MTS) roadway and transit system and uses level
-
of
-
service
standards as a means to measure congestion and has
established level
-
of
-
service standards to determine how local governments meet the standards of the CMP.
City of Hayward VMT Thresholds of Significance
CEQA Guidelines Section 15064.3(b) indicates that lan
d use projects would have a significant impact
if the project resulted in VMT exceeding an applicable threshold of significance.
In June 2020, the
City of Hayward adopted the following thresholds of significance for VMT analysis according the guidance from
OPR
:
Residential: 15 percent below existing average VMT per capita for the City
Employment
–
Office: 15 percent below existing regional average VMT per employee
Employment
–
Industrial: Below existing regional average VMT per employee
Retail: Net increas
e in total regional VMT
In addition, the City of Hayward has developed screening criteria to provide project applicants with a conservative indication of whether a project could result in potentially significant VMT impacts. If the screening criteria are m
et by a project, the applicant would not need to perform a detailed VMT assessment for their project. The thresholds and screening criteria that apply to the proposed project are discussed further in Section 4.4.3,
Impact Analysis
.
City of Hayward
4350 Point Eden Way Industrial Development Project
4.4 -
4 4.4.3
Impact Analysis
a.
Methodol
ogy and Significance Thresholds
Methodology
The analysis presented herein is derived primarily from a Transportation Analysis
prepared by
Kittelson & Associates
for the
proposed project, included as Appendix
C
to this EIR. The Analysis,
dated January 2021,
assess
es
the VMT impact of the project.
Before undertaking
the VMT
analysis, the project underwent a screening assessment to determine if the impact can be screened out as having a less than significant impact according to criteria adopted by the City of Hayward, discussed further under
Significance Thresholds
below.
The
proposed
preserve area on the western component of the project site would generate no vehicle trips or associated VMT because no activities are proposed within this portion of the project site. Similarly, the relocated segment of the San Francisco Bay Tra
il would generate no VMT because
the trail
realignment would change the number of people who drive to use the trail . Therefore, the project’s
potential VMT impacts
were
analyzed as two major components:
Office:
the approximately 2,785 square
-
foot office
portion of
the proposed industrial building
would house U
-Haul’s regional corporate offices. The screening criteria and thresholds of significance for employment
-office projects was applied to this project compon
ent.
Industrial:
the approximately
114,059
square foot warehouse
portion of the proposed building
would be used to house U
-Haul storage pods, materials
,
and trucks. The screening criteria and
thresholds of significance for employment
-industrial projects we
re applied to this project
component.
The screening criteria and thresholds of significance adopted by the City for employment
-office
projects
and
employment
-industrial projects
ar
e discussed further under
Significance Thresholds
below.
Significance Thresh
olds
According to the adopted Appendix G
of the State
CEQA Guidelines
, impacts related to
transportation and circulation from the proposed project would be significant if the project would:
Conflict with a
program,
plan, ordinance or policy
addressing
the
circulation system, including
transit
, roadway, bicycle, and pedestrian facilities
;
C
onflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b) ;
Substantially increase hazards due to a
geometric
design feature (e.g., sharp
curves or
dangerous intersections) or incompatible uses (e.g., farm equipment) ; or
Result in inadequate emergency access
.
Impacts associated with CEQA checklist items
1, 3, and
4 were determined to be less than significant
or no impact in the Initial Study
prepared for the proposed project and included with this EIR
as
Appendix A. Therefore, no further analysis is warranted, and these t opics
will not be discussed
further in this section.
Section 15064.3 of State CEQA Guidelines, referenced in significance t hreshold 3 above, pertains to
VMT.
The City of Hayward adopted VMT thresholds for
specific land use
types
. The adopted VMT
Environmental Impact Analysis
Transportation
Draft Environmental Impact Report
4.4 -
5 thresholds for each land use are present
ed in
Table
4.4 -
1 , and
Table
4.4 -
2 shows the City’s screening
criteria for projects to be considered to have a less than significant VMT impact.
Table
4.4 -
1 City of Hayward VMT Thresholds of Significance
Land Use
VMT Threshold
Precedent
Residential
15% below existing average VMT per capita
for City of Hayward
Governor’s Office of Planning and
Research (OPR)
Employment
-
Office
15 % below existing regional average
employee per employee
OPR
Employment
–
Industrial
Below existing regional average VMT per
employee
City of San Jos
é
Retail
Net increase in total regional VMT
OPR
Source:
Appendix
C
Table
4.4 -
2 City of Hayward Screening Criteria for Development Projects
Screen Type
Screening Criteria
Small Infill Projects
Single
-
family detached housing of 15 units or less
Single
-
family attached or
multi
-
family housing of 25 units or less
Office of 10,000 square feet of gross floor area or less
Local Serving Retail
50,000 square feet of total gross floor area or less
Local Serving Public
Facilities
Local public serving facility
(determined with staff input, depending on the land use)
Residential and
Employment
-
Office
Land Use Projects
or Components
Location
: within a half mile of a major transit stop1 or in an area with low (below the threshold) VMT per
capita/employee and in an area with planned growth
Density/FAR:
-
Minimum gross floor area ratio (FAR) of 0.75 as applicable for employment project
-
Minimum of 35 units per acre as applicable for residential projects
-
If located in an area where zoning
calls for lower than 0.75 FAR or fewer than 35
units per acre, the maximum FAR or units per acre density allowed must be used
Parking
: No more than the minimum number of parking spaces required; in cases where no minimum is required and a maximum is ident
ified, no more than the
maximum number of parking spaces
Does not replace affordable residential units (including naturally occurring affordable residential units) with a smaller number of moderate -
or high
-
income
residential units
Consistent
with local p
lans for development priorities
Restricted
Affordable
Residential Projects
or Components
Affordability:
100% deed
-
restricted affordable housing (exception for the manager’s
unit(s)); affordability must extend for a minimum of 55 years for rental homes or 45
years
for for
-
sale homes. Affordability for this purpose is restricted to households making 80%
or less of the area’s median income.
Location:
within an area with below average VMT per capita
Parking:
no more than the minimum number of parking
spaces required; in cases where
no
minimum is required and a maximum is identified, no more than the maximum
n
umber of
parking spaces
Source:
Appendix
C
Threshold
2 :
Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
City of Hayward
4350 Point Eden Way Industrial Development Project
4.4 -
6 Impact TR
-
1 T
HE
PROPOSED PROJECT WOULD GENERATE
18.23 VMT
PER EMPLOYEE
,
WHICH
EXCEEDS THE
VMT
THRESHOLD OF THE EXISTING REGIONAL AVERAGE OF
18.15 BY
0.5 PERCENT
.
I
MPAC
TS
WOULD BE
POTENTIALLY
SIGNIFICANT
,
BUT
MITIGA
BLE
.
Pursuant to the City of Hayward’s guidelines, projects should undergo a screening assessment by land use type. The proposed project
is comprised of
a trail realignment, establishment of a preserve,
an off
ice use
,
and an industrial use.
Realignment of the San Francisco Bay Trail and Preserve Establishment
These project components would not generate trips and would have no effect on VMT. Realignment of the trail segment would not generate new trail users.
P
reservation of the western component of
the project site would not generate vehicle trips or associated VMT because no development or maintenance activities are proposed within the preserve area.
Office Use Component
The City’s
VMT screening
criteria for employment
-
office land uses
provide an opportunity to screen
out small projects such as offices of 10,000 square feet of gross floor area or less. The proposed
building
would
contain approximately
2,785 square
feet of
office space.
Therefore, the proposed
office use on the project site would be below the screening criteria for employment -
office land uses.
Projects that do not exceed the screening criteria have less than significant VMT impacts and require no additional
analysis or mitigation.
Industrial Use Component
Pursuant to the City’s screening criteria presented in
Table
4.4 -
2 , above, employment projects
locate
d in areas with low baseline VMT and/or within a half mile of a major transit stop or corridor and include features that support low VMT can be assumed to have less than significant impacts and additional analysis is unnecessary.
As described above in Sect
ion 4.1,
Setting
, the nearest transit
stop to the project site is approximately 1 mile away. Therefore, the project site is not within a half mile of a major transit stop. The City’s VMT mapping also indicates that the project site is not within a low base
line VMT area. Therefore, the warehouse portion of the proposed project does not meet VMT screening criteria.
According to the City’s GIS portal, the project site is in a TAZ with an existing VMT of 18.23 per capita or employee. Therefore,
the Transportati
on Analysis
determined that the
proposed project
,
including both the industrial warehouse space and the office space
would also generate 18.23 VMT
per capita, consistent with the baseline VMT of the TAZ (see Appendix C
).
As presented in
Table
4.4 -
2 , above, employment
-
industrial land uses result in significant impacts if VMT would exceed the existing regional average VMT per employee, which is 18.15. Becaus e
the
project would generate
VMT of 18.23 per employee, it would exceed the regional average of 18.15 by approximately 0.5 percent. Impacts would be potentially significant. Therefore, Mitigation Measure TR
-
1 would be
required to reduce this potential impa
ct to a less
-
than
-
significant level.
Mitigation Measures
TR
-
1 Travel Demand Management
The project
applicant
shall implement
at least
one of the
measures described below:
Environmental Impact Analysis
Transportation
Draft Environmental Impact Report
4.4 -
7
Voluntary Employer Commute Program:
The project applicant
shall encourage alternative
modes of transportation through a program that may include elements such as: a carpool or vanpool program, subsidized or discounted transit passes, bike amenities, commute trip -
reduction marketing, and preferential parking perm
it program.
Employer Carpool Program:
The project applicant
shall encourage carpooling by providing ride
matching assistance to employees, providing priority parking for carshare vehicles, and providing incentives for carpooling.
The applicant shall prov
ide to the City documentation that at least one of the above measures is implemented. Documentation shall be provided annually.
Significance A
fter Mitigation
Impacts would be less than significant with implementation of Mitigation Measure TR -
1. As
describ
ed above,
project VMT would exceed the threshold of significance by approximately 0.5 percent. As demonstrated below, each of the measures in Mitigation Measure TR -
1 would reduce
project VMT by at least 0.5 percent.
The Transportation Analysis prepared for
the project recommends an additional mitigation to
reduce VMT consisting of an employer transit pass subsidy. The measure would require the project applicant to partially subsize transit passes for project employees. This measure is not included as mitiga
tion in this EIR because the project site is approximately 1 mile from the nearest transit stop.
Given the distance between the project site and transit stop, and that Point Eden Way contains no sidewalks, it is unlikely a transit pass subsidy would effect ively reduce impacts to less than
significant.
Voluntary Employer Commute Program
As described in Appendix
C
, assuming that 100 percent of employees would be eligible to participate in the
program, a VMT reduction of 6 percent would occur. This would exceed the 0.5 percent
reduction required to reduce the impact to a less than significant level.
Employer Carpool Program
As described in Appendix
C
, assuming that 100 percent of employees would be eligible to participate in the program, a VMT reduction of
8 percent would occur. This would exceed the 0.5 percent reduction required to reduce the impact to a less than significant level.
4.4.4 Cumulative Impacts
The cumulative impacts assessment area for transportation is the City of Hayward
. This area is
appropriat
e because some VMT
is
evaluated using
citywide
thresholds, making the
City
the
appropriate geographic extent for the cumulative impacts assessment.
Some cumulative
growth in the City
would increase residency in the
City
, and thus the number of
vehicles that operate in the
City
. Increase
d
vehicle use could result in increased VMT in the
City
,
depending on the origin and destination of trips. Because reasonably foreseeable future projects would increase VMT, cumulative imp
acts could
be potentially significant.
As described under Impact
TR
-
1,
the proposed project
would have a less than significant VMT impact
with implementation of
City of Hayward
4350 Point Eden Way Industrial Development Project
4.4 -
8 Mitigation Measure TR
-
1. With implementation of the indicated mitigation, VMT of the proposed p
roject
would be below the existing regional VMT
,
and
the proposed project would not have a
cumulatively considerable contribution to
cumulative VMT impacts.
Other CEQA Required Discussions
Draft Environmental Impact Report
5 -
1 5
Other CEQA Required
Discussions
This section discusses growth
-
inducing impacts
and
irreversible environmental impacts
that would
be caused by the proposed project.
5.1 Growth Inducement
Section 15126(d) of the CEQA Guidelines requires a discussion of a proposed project’s potentia l to
foster economic or population growth, including ways in which a project could remove an obstacle to growth. Growth does not necessarily create significant physical changes to the environment.
However, depending upon the type, magnitude, and location o f growth, it can result in significant
adverse environmental effects. The proposed project’s growth inducing potential is therefore considered significant if project
-
induced growth could result in significant physical effects in one or more environmental i
ssue areas.
5.1.1 Population Growth
As discussed in Section XIII,
Population and Housing
, of the Initial Study (Appendix
A
), the proposed
project would not directly
induce substantial
population growth because i
t is not a large technology
campus or medical facil
ity or similar type of development that would create jobs that attract people to relocate to the region from other areas of the state or country .
The project would result in
approximately 20
-
25 on
-
site employees. It is likely
that most of
these would be
drawn from the
existing workforce
in the Bay Area
.
5.1.2 Economic Growth
The proposed project would generate employment opportunities during construction. Because construction workers would be expected to be drawn from the existing regional work force, construction of the project would not be growth
-
inducing from a temporary em
ployment
standpoint. However, the proposed project would also
add
20 -
25 long
-
term employment
opportunities associated with operation of
the proposed industrial building
.
The proposed
project
would not induce substantial economic expansion to the extent tha t direct physical environmental
effects would result. Moreover, the environmental effects associated with future development in or around
the City of
Hayward
would be addressed as part of the CEQA environmental review for such development projects.
5.1.3 Removal
of Obstacles to Growth
The project site is located adjacent to
urbanized areas of the City of Hayward.
As discussed in
Section XVII,
Utilities
and Service Systems
, of the
Initial Study (Appendix
A
)
, there are
existing water,
wastewater treatment, stormwat
er drainage, electric power, natural gas, and telecommunication facilities in the right
-
of
-
way of Point Eden Way
that are available to serve the project
. The project
would not require the extension
of,
or add substantial capacity to,
roads
or other infrast
ructure that
would facilitate or accommodate development beyond the project site .
The project would also
include relocation of the San Francisco Bay Trail but would not extend the trail to new areas of the
Bay.
Because the project does not
involve or
requi
re the extension of new infrastructure through
or
to
undeveloped areas,
or increase infrastructure capacity in such a way as to facilitate or City of Hayward
4350 Point Eden Way
Industrial Development Project
5 -
2 accommodate growth beyond the project site,
project implementation would not remove an
obstacle to growth.
5.2 Irrever
sible Environmental Effects
The CEQA Guidelines require that EIRs contain a discussion of significant irreversible environmental changes. This section
addresses non
-
renewable resources, the commitment of future generations to the proposed uses, and irrever
sible impacts associated with the proposed project.
Construction and operation of the project would involve an irreversible commitment of construction materials and non
-
renewable energy resources. The project would involve the use of building materials and
energy, some of which are non
-
renewable resources, to construct the overall building
floor area.
Likewise, relocation of the San Francisco Bay Trail would require energy consumption.
Consumption of these resources would occur with any
development in the region and are not
unique to the proposed project.
The proposed project would also irreversibly increase local demand for non -
renewable energy
resources such as petroleum products and natural gas. However, increasingly efficient building
design would offset this demand to some degree by reducing energy demands of the project.
The
project would
be required to
comply with standards set
forth
in California Building Code (CBC) Title
24, which would minimize the wasteful, inefficient, or unnec essary consumption of energy
resources during operation
.
CALGreen
(as codified in CCR
Title 24, Part 11) requires implementation
of energy
-
efficient light fixtures and building materials into the design of new construction projects.
Furthermore, the 2019 B
uilding Energy Efficiency Standards (CBC Title 24, Part 6) requires newly constructed buildings to meet energy performance standards set by the CEC
.
T
hese standards are
specifically crafted for new buildings to
achieve
energy efficient performance. The sta
ndards are
updated every three years
,
and each iteration
increases
energy efficien
cy
standards. For example,
according to the CEC,
n
onresidential buildings will use about 30 percent less energy due mainly
to
lighting upgrades (CEC 2018c
).
The City also has
a Reach Code that requires efficiency beyond
CalGreen, which would be applicable to the proposed project.
Furthermore, the project would
continue to reduce its use of nonrenewable energy resources as the percentage of electricity
generated by renewable re
sources provided by PG&E continues to increase to comply with state requirements through Senate Bill 100, which requires
electricity providers to increase procurement
from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by
2030, and 100 percent by 2045
.
Additional vehicle trips associated with the proposed project would incrementally increase local traffic and regional air pollutant and GHG emissions. However, as discussed in Section 3 ,
Air Quality
,
and Section
7 ,
Greenhouse Gas Emissions
, of the Initial Study (Appendix
A
), development and
operation of the project would not generate air quality or GHG emissions that would result in a significant impact. Additionally, Section 4.
4 ,
Transportation
, of
this EIR
conclu
de
s
that
impacts
associated with the proposed project would be less than significant
with mitigation
based on
adopted City threshold
s.
The project would also require a commitment of law enforcement, fire protection, water supply, wastewater treatment, and solid waste disposal services. However, as discussed in Section 15 ,
Public Services
, and Section
19 ,
Utilities and Service Systems
, of
the Initial Study
, impacts to these
service systems would not be significant.
Other CEQA Required Discussions
Draft Environmental Impact Report
5 -
3 CEQA requires decision makers to balance the benefits of a proposed project against its unavoidable environmental risks in determining whether to approve a project. The analysis contained in this EIR
concludes that the proposed project would result in
impacts that are less than significant or less
than significant with mitigation
, except for potential impacts to historic resources. As described in Section 4.2,
Cultural Resources
,
and below in 5.3,
Significant and Unavoidable Impacts
,
implementation of the project would result in potentially significant unavoidable impacts to historic resources due to proposed demolition of the Oliver Brothers Salt Works structures .
5.3 Significant and
Unavoidable Impacts
The proposed project includes demolition of the Oliver Brothers Salt Works structures. As described in Section 4.2,
Cultural Resources
, demolition of the structures and development of the project site would result in potentially signifi
cant impacts to historic resources. Implementation of mitigation measures CUL
-
1a and CUL
-
1b, as described in Section 4.2, would be required. However, impacts would remain significant and unavoidable with implementation of mitigation measures.
City of Hayward
4350 Point Eden Way
Industrial Development Project
5 -
4 This page
i
ntentionally left blank
Alternatives
Draft Environmental Impact Report
6 -
1 6
Alternatives
As required by Section 15126.6 of the
CEQA Guidelines
, this EIR examines a range of reasonable
alternatives to the proposed project that would attain most of the basic project objectives (stated in Section 2.0
,
Project Description
,
of this EIR
) but would avoid or substantially lessen the significant adverse impacts.
As discussed in Section 2.0,
Project Description
, the objectives for the proposed project, are as
follows:
Develop an industrial building to house U
-
Haul corporate headquarters and
a warehouse.
Locate the building at the western edge of Hayward in proximity to a regional highway and other industrial, warehousing and logistics uses to avoid land use conflicts.
Cre
ate new employment and economic growth opportunities by redeveloping a vacant and
underutilized property.
Establish a wetland preserve adjacent to the San Francisco Bay.
Remove a dilapidated and unsafe structure from a currently underutilized property at the gateway to the City.
Included in this analysis are
three
alternative
s, including the CEQA
-
required “no project” alternative,
that involve changes to the project that
would
reduce the project
-
related
potentially significant
environmental impacts as identified in this EIR. Alternatives have been developed to provide a reason
able range of options to consider that would help
decision makers and the public understand
the general implications of revising or e
liminating certain components of the proposed project.
The following alternatives are evaluated in this EIR:
Alternative 1:
No Project
Alternative 2:
Enterprise Avenue
Alternate
Site
Alternative 3: Reduced Project
Detailed descriptions of the alternatives are included in the impact analysis for each alternative. The potential environmental impacts of each
alternative are analyzed in Sections 6.
2 through
6. 4
.
6.1 Potentially Significant Impacts
According to Section 15126.6(b) of the State CEQA Guidelines, the discussion
of
EIR
alternatives
shall focus on alternatives to the project or its location which are cap able of
avoiding or
substantially lessening significant effects of the project . The City prepared an Initial Study and this
EIR to
analyze the project for potentially significant impacts related to each of the environmental issues or resource areas contain
ed in Appendix G of the State CEQA Guidelines (see Appendix A to this EIR).
The results of the Initial Study and EIR analyses determined that the proposed project would have potentially significant and unavoidable impacts to historic resources (see Section
4.2,
Cultural Resources
).
Additionally, mitigation measures
a
re identified
in this EIR
for the following
topics
that would
reduce the respective potentially significant impacts of the project to less than significant
levels
:
City of Hayward
4350 Point Eden Way Industrial Development Project
6 -
2
Biological Resources, specific
ally effects on special
-
status wildlife species and their habitat and
natural communities (mitigated to less
-
than
-
significant impact level by Mitigation Measures
BIO
-
1a through 1h)
Biological Resources, specifically effects on jurisdictional wetlands (miti gated to less
-
than
-
significant impact level by Mitigation Measure BIO
-
3)
Cultural Resources, specifically effects related to previously unidentified subsurface
resources
(mitigated to less
-
than
-
significant impact level by Mitigation Measures CUL
-
1 through
CUL
-
3
Hazards and Hazardous Materials, specifically effects related to exposure of project construction personnel to
lead paint and/
o
r
asbestos containing materials during demolition of existing structures hazardous (mitigated to less
-
than
-
significant impa
ct level by Mitigation Measure
HAZ
-
1)
Hazards and Hazardous Materials, specifically effects related to exposure of persons or
groundwater
to hazardous contamination (petroleum hydrocarbons, soil vapor, etc.) during construction and operation (mitigated to
less
-
than
-
significant impact level by Mitigation
Measures HAZ
-
2a through 2c)
Transportation, specifically effects related to vehicle miles traveled
(VMT)
, as the project
VMT
per employee
would
exceed the regional average by 0.5 percent (mitigated to less
-
than
-
significant level by Mitigation Measures TR
-
1)
6.2 Altern
a
tive 1: No Project Alternative
6.2.1 Description
The No Project Alternative assumes that the
industrial
building,
surface parking, driveway
,
landscaping,
and other
project components
associated with
the proposed
industrial building
are not
constructed.
Additionally, the San Francisco Bay Trail would remain in its current location and would not be realigned. Likewise, a wetland preserve would not be established on the western component of the project
site.
The western component of the project site would not
be preserved in perpetuity
via recordation of a deed restriction or other appropriate legal mechanism ; therefore,
the salt ponds
and other areas of the western component of the site could be utilize
d for flood pla
i
n and
agricultural uses such as chemical extraction from baywater, crop and tree farming, dredging, farming or ranching and limited sales of materials grown on site .
The project site would remain in its
current
unused
s
tat
e, and the existin
g structures associated with the former Oliver Brothers Salt Works operation would not be demolished.
T
he No Project Alternative would not fulfill
any of
the
p
roject
o
bjectives
.
6.2.2 Impact Analysis
a.
Biological
Resources
Under the No Project Alternative, the ne
w medical office building would not be constructed and
operated on the project site, nor would the various utility, landscape, and street improvements occur.
There would be no change to listed species or habitat, including that of the salt marsh harvest mo
use or burrowing owl, and the San Francisco Bay Trail would not be relocated. No riparian or wetland habitat would be affected. As no construction would occur on the site, no potential impacts to nesting birds would occur. T
here would be no biological resources impacted or enhanced under this alternative compared with existing conditions.
However, effects unrelated to the project, such
Alternatives
Draft Environmental Impact Report
6 -
3 as the potential for sea level rise to impact habitat for salt marsh harvest mouse, would o ccur
regardless of the potential implementation of this alternative or the proposed project.
The proposed project
’s
impacts related to biological resources would be less than significant with mitigation (see Section 4.1,
Biological Resources
). Because the
No Project Alternative would have no
impact, biological resources impacts would be
reduced
compared to the proposed project
and no
mitigation measures would be required
.
b.
Cultural Resources
The No Project Alternative would not involve construction or ground
disturbance on the project site.
Therefore, there would be no potential for encountering or damaging potential buried cultural resources. Because this alternative would preclude development of the project site, the former Oliver Brother Salt Works buildin
g on the eastern component of the project site would not be demolished. The structure would remain in place but would be subject to continued natural deterioration
,
weathering
and squatting
by homeless individuals
.
The No Project Alternative would
have no
impact on cultural resources.
As described in Section 4.2,
Cultural Resources
, the proposed project would have significant and
unavoidable impacts to historic resources resulting from demolition of the Oliver Brother Salt Works building
, and mitigation mea
sures would be required
. Because the No Project Alternative would
avoid this significant impact, as well as potential impacts to subsurface resources, impacts would be reduced
compared to the proposed project
and no mitigation would be required
.
c.
Hazards an
d Hazardous Materials
Under the
N
o Project Alternative, there would be no demolition of the existing on -
site structures
and no new construction, and no impacts related to potential exposure to
lead or
asbestos
-
containing materials.
Additionally, the propos
ed building would not be constructed, including
displacement piers for the building foundation or on
-
site bioretention areas for stormwater
management. Therefore, the No Project Alternative would have no potential to create new preferential pathways for sh
allow contaminated groundwater to reach deeper groundwater.
Additionally, because the proposed building would not be constructed, it also would not be occupied and there would be no potential for vapor intrusion risk. The No Project Alternative would have
no impacts related to hazards and hazardous materials.
As described in Section 4.3,
Hazards and Hazardous Materials
, the proposed project would have
potentially significant but mitigable impacts related to hazards materials and hazardous contamination. Bec
ause the No Project Alternative would have no impact, impacts of this alternative would be
reduced
compared to the proposed project
and no mitigation would be
required
.
d.
Transportation
The No Project Alternative would result in no new development or changes
to the project site.
Currently, the project site is
unused
and does not generate VMT. Therefore, the No Project
Alternative would generate no new VMT, as the site would continue to be unused
. Additionally, the
No Project
Alternative
would have no conflict
s with plans or programs pertaining to circulation,
including bicycle, pedestrian, and transit circulation. The San Francisco Bay Trail would remain in its current alignment and available for bicycle and pedestrian travel.
The No Project Alternative would
have no impacts on transportation.
City of Hayward
4350 Point Eden Way Industrial Development Project
6 -
4 As described in Section 4.4,
Transportation
, the proposed project would generate new VMT that
exceeds the regional average VMT per employee. Impacts would be potentially significant but mitigable. Because the No Project Alternative would have no transportation impacts, impacts of this alternative w
ould be
reduced
compared to the proposed project
and no mitigation would be
required
.
6.3 Alternative 2:
Enterprise Avenue
Alternate
Site
6.3.1 Description
Under the
Enterprise Avenue Alternate Site
Alternative,
the proposed industrial building
would be
constructed
on an approximately 10.8
-
acre property located at 3636 Enterprise Avenue in Hayward.
The property is identified as APN 439
-
0099
-
036
-
02, and is zoned as General Industrial (IG). The
property is mostly vacant with the exception of several radio communication
towers scattered
across the property. A small structure is located at the base of one tower and is associated with the tower operations. Vegetation is present across nearly the entire property, and based on aerial photography, consists
primarily
of
low gr
asses, weeds, and shrubs
.
Alternative 2 assumes that the industrial building and associated surface parking lot would be approximately the same size and design as the proposed project, only located on the Enterprise
Avenue
property instead of the project
site.
However, because the Enterprise Avenue property is an
upland area, Alternative 2 would not include establishing a wetland preserve on -
site or off
-
site.
Likewise, this alternative assumes the existing structures and ponds associated with the former Ol
iver Brothers Salt Works operation on the project site would remain unchanged from current conditions, because Alternative 2 would involve no activities or development at the project site.
The San Francisco Bay Trail is not adjacent the Enterprise Avenue property. Therefore, Alternative 2
would not involve relocation of the trail or coordination with the East Bay Regional Parks District.
However, Alternative 2 would include relocating the existing radio communication towers and associated building that cur
rently exist on the Enterprise Avenue property.
The Enterprise Avenue Alternate Site
Alternative would fulfill
some
project objectives
but not all
objectives. For example, this alternative would develop an industrial building to house U
-
Haul
corporate headquarters and a substantial warehouse
at the western edge of Hayward in proximity
to regional roadways. Alternative 2 would also be near
other industrial and warehousing land uses
and would create new employment opportunities by developing a property that is currently vacant.
However,
Alternative 2 would not fulfill project objectives to establish a wetland preserve adjacent to the San Fra
ncisco Bay or to remove the dilapidated Oliver Brothers Salt Works structures from the State Route 92 gateway to the City.
6.3.2 Impact Analysis
a.
Biological
Resource
s
The Enterprise Avenue site is not in proximity to salt marsh habitat. Therefore, implementation of
the Enterprise Avenue Alternate Site
Alternative
would have no potential to impact species
associated with salt marsh habitat, such as salt marsh harvest mouse or salt marsh wandering shrew. Additionally, the existing structure on the Enterprise Avenue site is a small shed
-
like
structure associated with current operations of the on
-
site radio communication towers. Because
Alternatives
Draft Environmental Impact Report
6 -
5 the towers are currently operated and maintained, it is assumed that bats do not actively roost in the structure, and this alternative
would have no impact to special
-
status bats.
The Enterprise Avenue site consists primarily of open grass. The radio communication towers may provide perching spots for foraging raptor species, given that the towers are in open grassland.
Additionally, the
towers or the grass habitat may be used for nesting migratory bird species, and the grassland habitat specifically could be suitable for burrowing owl. Construction of the Enterprise
Avenue Site Alternative
would require removal of the radio communication
towers and grass
habitat. The site would be converted into the proposed industrial building and associated surface parking and landscaping. Therefore, the
Enterprise Avenue Alternate Site
Alternative
would have
potentially significant but
mitigable impacts to special
-
status species. Implementation of Mitigation
Measures BIO
-
1b through BIO
-
1e and BIO
-
1g would be required for this alternative.
According to the U.S. Fish and Wildlife Service, there are no wetland areas on the
Enterprise Avenue
site
(U.S. Fish and Wildlife Service 2020).
Therefore, construction of an industrial building on the site would have no impacts on wetlands. Because the site is upland grass, construction of this alternative would also have no impacts on sensitive natural
communities.
Overall, the
Enterprise Avenue Alternate Site
Alternative
would have potentially significant but
mitigable impacts on special
-
status species, but fewer special
-
status species would be impacted
compared to the proposed project. Additionally,
while the proposed project would have potentially
significant but mitigable impacts to wetlands and sensitive natural communities, the Enterprise
Avenue
Alternate
Site Alternative
would have no impact. Accordingly, impacts of the
Enterprise
Avenue
Alternat
e
Site Alternative
would be less than significant with mitigation and
reduced
compared to the proposed project.
b.
Cultural Resources
Construction of the Enterprise Avenue Alternate Site
Alternative
would require demolition or
removal of the on
-
site radio com
munication towers and associated shed
-
like structure. Based on a
review of aerial photography, the towers and associated structure were constructed sometime after 1982 but before 1987 (Historic Aerials 2021). Based on the apparent age of these structures (
approximately 39 years to 34 years), the Enterprise Avenue site contains no
known
historic
structures or potentially historic structures. Therefore, construction of the Enterprise Avenue Alternate Site Alternative would have
unknown but ex
pected
less than
significant effect
on historic
resources because historic structures are not known to be present .
Construction of the Enterprise Avenue Alternate Site
Alternative
would require ground disturbance
and excavation for the building foundation, utility connecti ons, and other subsurface project
component
s
. There is always potential for previously unknown or unidentified subsurface cultural resources to be uncovered during ground disturbance and excavation. If construction of the Enterprise Avenue Alternate Site
A
lternative
were to encounter resources and result in damage or
destruction of the resource or resources, impacts would be potentially significant but mitigable.
Implementation of the Mitigation Measure
C
U
L
-
2 in Section 4.2,
Cultural Resources
, would be
req
uired for this alternative.
Implementation of mitigation would reduce impacts to less than significant.
Overall, the Enterprise Avenue Alternate Site
Alternative
would
likely
avoid
or reduce
the project’s
potentially significant and unavoidable impact to h
istoric resources. Impacts to buried or subsurface
resources would be reduced to less than significant with implementation of mitigation measures.
Because the Enterprise Avenue Alternate Site
Alternative
would completely avoid significant and
City of Hayward
4350 Point Eden Way Industrial Development Project
6 -
6 unavoidable i
mpacts to historic resources, impacts would be
reduced
compared to the proposed
project.
c.
Hazards and Hazardous
Materials
Construction of the Enterprise Avenue Alternate Site
Alternative
would require demolition or
removal of the existing on
-
site radio communication towers and associated shed
-
like structure.
Based on a review of aerial photography, the towers and associated structure were constructed sometime after 1982 but before 1987 (H
istoric Aerials 2021). Because the towers and shed
-
like
structure were constructed in the 1980s, lead
-
based paint and asbestos would not have been used
in their construction. Therefore, demolition of removal of the towers and structure would not expose con
struction workers or others to potential hazards. The Enterprise Avenue Alternate Site
Alternative
would have no impact related to
reasonably foreseeable upset and accident conditions
involving the release of hazardous materials into the environment .
Accor
ding to the State Water Resources Control Board (SWRCB) and California Department of Toxic Substances Control (DTSC), the project site is not on a
list of hazardous material sites compiled
pursuant to Government Code Section 65962.5
(SWRCB
2021
; DTSC
2021
)
. Therefore, construction
of the Enterprise Avenue Alternate Site
Alternative
would have
negligible
potential to create a
significant hazard to the public or the environment. The Enterprise Avenue Alternate Site
Alternative
would have
less than significant
impacts
.
The Enterprise Avenue
Alternate
Site
Alternative would have a reduced hazards and hazardous materials compared to the proposed project.
d.
Transportation
According to the City’s GIS portal, the
average
VMT per employee
within the traffic analysis zo
ne
(TAZ) containing the
Enterprise Avenue Site is 20.64
(City of Hayward 2020)
.
As described in Section
4.4,
Transportation
, the regional average VMT per capita
or employee
for industrial projects is
18.15. Therefore, the Enterprise Avenue
Alternate
Site A
lternative would require a VMT reduction
of approximately 14 percent to achieve a less than significant impact. This is higher than the proposed project site’s VMT per employee of 18.23, which requires a 0.5 percent reduction.
Therefore, the VMT impact of
the Enterprise Avenue
Alternate
Site Alternative would
be potentially
significant. Compared with the proposed project, impacts of this alternative would
be greater and
additional mitigation
would be required
compared to the proposed project.
6.4 Alternative
3 :
Reduced
Project Alternative
6.4.1 Description
The
Reduced
Project Alternative assumes that
, like the proposed project,
the industrial building,
surface parking, driveway, landscaping, and other
project components
associated with the proposed
industrial building
would be
constructed
on the eastern component of the project site
. Additionally,
the San Francisco Bay Trail would be realigned
to encompass the eastern component of the site, like
the proposed project
.
Lik
ewise, a wetland preserve would be established on the western component of the project site
, consistent with the proposed project
.
However, the industrial
building and surface parking lot would be reduced in size by approximately 50 percent
and shifted
sou
th within the eastern component of the project site in order to avoid demolition of the former Alternatives
Draft Environmental Impact Report
6 -
7 Oliver Brothers Salt Works building in the northeast part of the site.
The existing building would be
left in place.
The Reduced Project
Alternative would fulfil
l
most
but not all
project
objectives. For example, this
alternative would
involve
develop
ment of
an industrial
building to house U
-
Haul corporate
headquarters and a warehouse
at the western edge of Hayward in proximity to regional roadways.
Alternative 3
would also be near other industrial and warehousing land uses and would create new employment opportunities by developing a property that is currently unused. Additionally, Alternative 3 would also fulfill the project objective to establish a wetland prese
rve adjacent to the
San Francisco Bay
.
However,
Alternative
3 would not fulfill
the
project objective to remove the
dilapidated Oliver Brothers Salt Works structures from the State Route 92 gateway to the City.
In
addition, this alternative would reduce th
e space available for the proposed project elements
compared to the propose project, which would result in smaller office and warehouse spaces
by
approximately 50 percent
.
6.4.2 Impact Analysis
a.
Biological Resources
The Reduced Project Alternative would be
constructed on the eastern component of the project
site. Therefore, construction of this alternative would impact the same biological resources as the proposed project, including special
-
status species, wetlands, and sensitive natural communities.
However
, the Reduced Project Alternative would require the industrial building and surface parking to be located farther south within the eastern component of the project site, result in additional wetland impacts compared to the proposed project. Additional wetl and impacts would occur
because the southern portion of the eastern component of the project site consists of wetlands.
Establishment of the preserve in the western component of the project site would have no impact to biological resources because no const
ruction, maintenance, or management activities would be conducted within the western component of the project site under this alternative , same as f
o
r the
proposed project
.
Overall, the Reduced Project Alternative would have significant but mitigable impac ts to biological
resources. Implementation of all mitigation measures in Section 4.1, Biological Resources
, would be
required. These mitigation measures include BIO
-
1a through BIO
-
1h and BIO
-
3. Compared to the
proposed project, the Reduced Project Alternat
ive would result in slightly greater impacts because
this alternative would impact more wetland areas.
b.
Cultural Resources
Because no construction, maintenance, or management activities would occur within the preserve area on the western component of the pr
oject site, establishment of a wetland preserve under this alternative would result in no impacts to cultural resources , as with the proposed project
.
Under the Reduced Project Alternative, the salt plant structure from the former Oliver Brothers Salt Work
s on the eastern component of the project site would be retained. Demolition of the structure would not be required because the project would be designed to avoid the structure. While the structure would be retained, construction of the Reduced Project Alt ernative would require
placement of fill within former salt ponds at the south end of the eastern component of the project site. Therefore, the Reduced Project Alternative would result in impacts to components of the historic Oliver Brothers Salt Works sit
e. Additionally, the proposed industrial building would be of modern design and construction and could conflict with the historic landscape designation of the City of Hayward
4350 Point Eden Way Industrial Development Project
6 -
8 existing structure on the
project site. While retention of the salt plant structure, as well as p
reservation of all former salt ponds in the western component of the project site ,
would help to
retain the historic integrity of the Oliver Brothers Salt Works site, required filling of salt ponds on the eastern component of the site could have potentially significant impacts on historic resources.
The Reduced Project Alternative would
involve construction and ground disturbance in the eastern component of the project site. Although the proposed industrial building and surface parking lot would be reduced in size, the excavation required for utility connections and foundation supports w
ould have the potential to uncover and disturb previously unknown or unidentified archaeological resources or human remains within the eastern component of the project site. Grading required for relocation of the San Francisco Bay Trail would also have the
potential to uncover and disturb or
damage subsurface archaeological resources. Disturbance or damage to archaeological resources would be a potentially significant but mitigable impact. Implementation of the Mitigation Measure CUL
-
2 in Section 4.2,
Cultu
ral Resources
, would be required for this alternative. Implementation of mitigation
measures
would reduce impacts to archaeological resources to less than significant.
Compliance with existing regulations, such as
Public Resources Code Section 5097.98
, wou
ld
prevent significant impacts related to discovery of human remains.
Overall, the Reduced Project Alternative would have potentially significant impacts to historic resources and significant but mitigable impacts to archaeological resources. Compared to t he
proposed project, the Reduced Project Alternative would result in reduced impacts because this alternative would avoid demolition of the Oliver Brothers Salt Works salt plant structure, which is a prominent component of the historic site and historic la ndscape.
c.
Hazards and Hazardous Materials
Because no construction, maintenance, or management activities would occur within the preserve area on the western component of the project site, establishment of a wetland preserve under this alternative would resu
lt in no impacts related to hazards and hazardous materials.
The Reduced Project Alternative would not require demolition of the former Oliver Brothers Salt Works salt plant structure, which could contain lead paint or asbestos containing materials. Becaus e
demolition would be avoided, there would be no potential for construction workers to be exposed to these hazards accidently during construction. Impacts would be less than significant.
The Reduced Project Alternative would be constructed on the eastern c omponent of the project
site. Therefore, construction of this alternative would require construction within the restricted areas, where soil and groundwater contamination exist (see Section 4.3, Hazards and Hazardous
Materials
). During construction, worker
s could be exposed to hazardous contamination, especially during excavation activities reaching depths of five feet or more below ground surface.
Likewise,
construction would generate dust. If soils from the contamination areas are stockpiled on site and b
ecome airborne dust, either from wind erosion or construction equipment, off -
site receptors could
be exposed, as well as project construction workers. Impacts would be potentially significant but mitigable. Implementation of Mitigation Measure HAZ
-
2a in Se
ction 4.3,
Hazards and Hazardous
Materials
, would be required, and impacts would be reduced to less than significant.
Given the extent and location of the restricted areas within the eastern component of the project site, the proposed industrial building w
ould at least partially overlie the areas under this alternative, despite the building be positioned closer to the south end of the site. Displacement piers required for the building foundation could create a preferential pathway for shallow groundwater co
ntamination to reach deeper groundwater. Likewise, bioretention areas for this alternative could Alternatives
Draft Environmental Impact Report
6 -
9 result in leaching of runoff through multiple underlying aquifers, creating a pathway for contamination. Impacts would be potentially significant but mitigable .
Mitigation Measures HAZ
-
2b
and HAZ
-
2c would reduce this impact to a less than significant level.
Additionally, because the building would be atop the restricted areas, there would be potential for vapor intrusion, exposing office and warehouse workers to
hazardous vapors. Impacts would be
potentially significant. Mitigation Measure HAZ
-
2a would reduce this impact to a less than
significant level.
Overall, the Reduced Project Alternative would have significant but mitigable impacts related
to
hazards and h
azardous materials
. Implementation of all
M
itigation
M
easures
HAZ
-
2a, HAZ
-
2b, and
HAZ
-
2c
in Section 4.
3 ,
Hazards and Hazardous Materials
, would be required. Compared to the
proposed project, the Reduced Project Alternative would result in slightly reduced
impacts because
this alternative would
avoid potential impacts related
to
the accidental release of lead or asbestos
.
d.
Transportation
Realignment of the San Francisco Bay Trail would not generate new VMT compared to existing conditions because realignment w
ould not increase vehicle trips from new trail users. Likewise, because no maintenance or management activities would occur within the preserve area on the western component of the project site, establishment of a wetland preserve under this alternative wo
uld generate no VMT.
The proposed industrial building would be reduced in size if the Reduced Project Alternative were implemented. Despite being reduced in size compared to the proposed project, the Reduced Project Alternative would generate the same VMT
per employee as the proposed project. The VMT would
be the same because it is based on the average VMT per employee for the traffic analysis zone (TAZ) where the project site is located. Therefore, like the proposed project, the Reduced Project Alternative
would generate 18.23 VMT per employee. As described in Section 4.4, Transportation
,
the regional average VMT per capita or employee for industrial projects is 18.15. Therefore, the Reduced Project Alternative would generate VMT exceeding the regional aver age VMT, and impacts
would be potentially significant but mitigable. Implementation of Mitigation Measure TR -
1 in
Section 4.4, Transportation, would be required and would reduce impacts to less than significant
levels
.
Impacts
of th
e Reduced Project A
lternative would be
similar
to the proposed project.
6.5 Alternatives Considered
b
ut Rejected
Section 15126.6 of the State
CEQA Guidelines
states that:
“An EIR shall describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen the significant effects of the proj ect, and evaluate the comparative merits
of the alternatives. An EIR need not consider every conceivable alternative to a project. Rather it must consider a reasonable range of potentially feasible alternatives that will foster informed decision making and
public participation. An EIR is not required to consider alternatives which are infeasible.
The lead agency is responsible for selecting a range of project alternatives for examination and must publicly disclose its reasoning for selecting those alternat ives. There is no ironclad rule
governing the nature or scope of the alternatives to be discussed other than the rule of reason.”
City of Hayward
4350 Point Eden Way Industrial Development Project
6 -
10 Among the factors that may be used to eliminate alternatives from detailed consideration in an EIR are: (1) failure to meet m
ost of the basic project objectives, (2) infeasibility, or (3) inability to avoid significant environmental impacts. Among the factors that may be taken into account when addressing the feasibility of alternatives are site suitability, economic viability, availability of
infrastructure, general plan consistency, other plans or regulatory limitations, jurisdictional boundaries (projects with a regionally significant impact should consider the regional context), and whether the proponent can reasonably acquir
e, control or otherwise have access to the alternative
site (or the site is already owned by the proponent). An EIR need not consider an alternative whose effect cannot be reasonably ascertained and whose implementation is remote and speculative.
The Cali
fornia Supreme Court, in Citizens of Goleta Valley v. Board of Supervisors (1990), indicated that a discussion of alternative sites is needed if the project “may be feasibly accomplished in a successful manner considering the economic, environmental, socia l, and technological factors
involved” at another site. Several criteria form the basis of whether alternative sites need to be considered in detail. These criteria take the form of the following questions:
1. Could the size and other characteristics of anoth
er site physically accommodate the project?
2. Is another site reasonably available for acquisition?
3. Is the timing of carrying out development on an alternative site reasonable for the applicant?
4. Is the project economically feasible on another site?
5. What are
the land use designation(s) of alternative sites?
6. Does the lead agency have jurisdiction over alternative sites? and
7. Are there any social, technological, or other factors which may make the consideration of alternative sites infeasible?
Site characteristic
s that could support a project that meets the project objectives include:
appropriate size to accommodate an economically viable
industrial building that also can house U
-
Haul corporate headquarters
;
proximity to a regional highway in Hayward
; and
proximit
y to other
industrial, warehousing, and logistics land uses to avoid land use conflicts .
In order to accommodate
the needed industrial and office uses, the industrial building must be located on a property or contiguous properties measuring approximately 6
.8 acres or larger. Additionally, the property must
be zoned Industrial Park or for industrial uses.
The following alternative
site
s were initially considered. However, for reasons discussed below, they were dismissed from further consideration.
6.5.1 4327 Break
water Avenue Site
Alternative
Under this alternative, the proposed building would have been constructed on a property at 4327 Breakwater Avenue identified as APN 439
-
0099
-
017
-
04. The property is adjacent to the north side
of State Route 92, opposite of the
project site. The property is currently vacant, but there is a freeway billboard on the property, adjacent to State Route 92. The property is in proximity to a regional highway, given that is adjacent to State Route 92. The property is zoned as Industrial
Park,
which would allow for an industrial warehouse. However, the property measures approximately 1 acre in size, and adjoining properties are either developed or consist of marshland that cannot be developed. Because the property measures only approximat ely 1 acre, which is less than the 6.8
acres needed for the industrial warehouse, the 4327 Breakwater Avenue Site Alternative was dismissed from further consideration.
Alternatives
Draft Environmental Impact Report
6 -
11 6.5.2
3590 Enterprise
Avenue
Site Alternative
Under this alternative, the proposed building wo
uld have been constructed on a property at 3590
Enterprise Avenue identified as APN 439
-
0099
-
003
-
07. The property is located at the southwest
corner of the intersection of Enterprise Avenue and Whitesell Street in eastern Hayward. The property is currently
vacant and has been scraped or cleared of vegetation. The property is in proximity to State Route 92. The property is zoned as General Industrial, which would allow for an industrial warehouse. However, the property measures approximately 3.9 acres in siz e, which is less
than the 6.8 acres needed for the industrial warehouse. Therefore, the 3590 Enterprise Avenue Site Alternative was dismissed from further consideration.
6.5.3 Arden Road Site Alternative
Under this alternative, the proposed building would have b een constructed on a property accessible
from an existing driveway on Arden Road identified as APN 461 -
0040
-
004
-
04. The property is
adjacent to an existing warehouse to the west and an asphalt parking surface to the north. Railroad tracks are located immed
iately east of the property. Wetlands and the Eden Ecological Reserve area located south of the property.
Industrial Boulevard is to the east, less than a mile, and provides access to State Route 92 to the north.
The property is currently vacant but
does a
ppear disturbed in some areas, and there is a dirt road in the southern portion. The property measures approximately 34.6 acres in size, which is beyond sufficient for the 6.8 acres needed for the industrial warehouse. However, according to the U.S. Fish a
nd Wildlife Service,
much of the property is freshwater ponds that are either permanently or seasonally inundated
(U.S. Fish and Wildlife Service 2020)
. Therefore, the developable area of the
property is less than 34 acres. The configuration of the mapped ponds on the property do not
provide large contiguous developable areas
of at least 6.8 acres
. Additionally, the property is zoned
as Open Space
District
, which does not allow for development of an industrial building. Because the property contains ponds t
hat reduce developable area to less than needed for the industrial building, and the property is zoned as Open Space
District
, the Arden Road Site Alternative was
dismissed from further consideration.
6.6 Environmentally Superior Alternative
Table
6 -
1 indicates whether each alternative’s environmental impact is greater than, less than, or similar to that of the proposed project for each of the issue areas studied
in this section of the EIR
.
Based on the alternatives analysis provided above, Alternative
1 would be the environmentally
superior alternative
, though it is the No Project Alternative, and therefore would not meet the objectives of the proposed project.
The environmentally superior development alternative would be Alternative 2, as it would reduce impacts in the categories of biological resource s, cultural
resources, and hazards and hazardous materials,
but
it would result in greater impacts regarding
transportation. Alternative 2, however, would not meet all the objectives of the proposed project ,
such as establishing a wetland preserve or remov
ing a dilapidated structure from the gateway to the
City
.
Neither
of
the alternatives analyzed above would create significant or unavoidable impacts , but
the proposed project would have a significant and unavoidable impact to historic resources .
City of Hayward
4350 Point Eden Way Industrial Development Project
6 -
12 Table 6
-
1 Impact Comparison of Alternatives
Issue
Proposed Project
Impact
Classification
1 Alternative 1: No
Project
Alternative
Alternative 2:
Enterprise
Avenue Alternate Site
Alternative
Alternative 3:
Reduced Project
Alternative
Biological Resources
Less than Significant
with Mitigation
+
+
-
Cultural Resources
Significant and
Unavoidable
+
+
+
Hazards and
Hazardous Materials
Less than Significant
with Mitigation
+
+
+
Transportation
Less than Significant
with
Mitigation
+
-
=
1 Most severe level of impact determination for proposed project is presented in this table.
+ Superior to the proposed project (reduced level of impact)
-
Inferior to the proposed project (increased level of impact)
= Similar level of
impact to the proposed project
References
Draft Environmental Impact Report
7 -
1 7
References
7.1 Bibliography
Biological Resources
California Department of Fish and Game. 1994. A Field Guide to Lake and Streambed Alteration Agreements, Sections 1600
-
1607. Environmental Service Division, California Department of Fish and Game, Sacramento, CA
.
California Department of Fish and Game. 2010. List of Vegetation Alliances and Associations.
Vegetation Classification and Mapping Program, California Department of Fish and Game, Sacramento, CA. September 2010.
California Department of Fish and Wildlife
. 2020. California Natural Diversity Database, Wildlife and Habitat Data Analysis Branch. Sacramento, CA. Accessed: June 2020
U.S. Army Corps of Engineers. 2008. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region (Ve
rsion 2.0). U.S. Army Corps of Engineers, Engineer
Research and Development Center, Vicksburg, MS. September 28, 2008.
Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Department of the Army, Waterways Experiment Station, Vic
ksburg, Mississippi 39180
-
0631.
San Francisco Estuary Institute. 2020. California Aquatic Resource Inventory. Available at:
http://www.sfei.org/cari#sthash.Mzz93W9i.dpbs. Accessed: June 2020
U.S. Fish and Wildlife Service. 2020. National Wetlands Inventory . Available at:
http://www.fws.gov/wetlands/index.html. Accessed: June 2020
U.S. Geological Survey. 2020. Redwood Point, California 7.5 -
minute quadrangle topographic map.
Cultural Resources
Anonymous
.
2020
.
“Four Generations of Salt
Production.” The Oliver Salt Company.
https://oliversalt.wordpress.com/2013/03/18/four
-
generations
-
of
-
salt/. Accessed
September 9, 2020.
Aqua Science Engineers, Inc. 2013. Recommendation for Case Closure as a Low -
Thread Underground
Storage Tank Case and Up
dated Site Conceptual Model ASE Job No. 3831 at Former Oliver Salt Facility, 4150 Point Eden Way, Hayward, California.
Bean, Walton
.
1968
.
California: An Interpretive History. New York, New York: McGraw -
Hill Book
Company.
Circa: Historic Property Developm
ent
.
2009
.
Historic Context Statement for the City of Hayward,
Administrative Draft Report. August. Prepared for the City of Hayward.
____.
2010
City of Hayward Historical Resources Survey and Inventory Report, Final. July.
Prepared for the City of Hayward
.
D’Oro, Stella
.
2009
.
Native California Prehistory and Climate in the San Francisco Bay Area. Master’s Thesis, San Jose State University.
City of Hayward
4350 Point Eden Way Industrial
Development Project
7 -
2 Dumke, Glenn S.
19 9
4 .
The Boom of the Eighties in Southern California. San Marino, California:
Huntington
Library
Publications.
Engelhardt, Zephyrin
.
1927
.
San Fernando Rey: The
Mission of the Valley. Chicago, Illinois:
Franciscan Herald Press.
Guinn, James M.
1976
.
Gold!
Gold! Gold! from San Francisquito! in Los Angeles Biography of a City.
John Caughey and
L
aRee Caughey, eds. Pp. 107
-
108. Berkeley, California: University of
California, Berkeley Press.
Hylkema, Mark G.
2002
.
Tidal Marsh, Oak Woodlands, and Cultural Florescence in the Southern San Francisco Bay Region. In Catalysts to Complexity: Late Holocene Societies of the California
Coast, edited by Jon M. Erlandson and Terry L. Jones, pp.233 –
262. Perspectives in California
Archaeology, Vol. 6. Cotsen Institute of Archaeology.
Kyle,
Douglas
E.
2002
.
Historic Spots in California. 5th ed. Stanford University
Press, Stanford,
California.
Lightfoot, Kent G., and Edward M. Luby
.
2002
.
Late Holocene in the San Francisco Bay Area:
Temporal Trends in the Use and Abandonment of Shell Mounds in the East Bay. In Catalysts to Complexity: Late Holocene Societies of the
California Coast, edited by Jon M. Erlandson
and Terry L. Jones, pp.263
-
281. Perspectives in California Archaeology, Vol. 6. Cotsen Institute of Archaeology, University of California, Los Angeles.
McCawley, William
.
1996
.
The First Angelinos: The Gabrielin
o Indians of Los Angeles. Malki
Museum/Ballena Press Cooperative Publication, Banning or Novato, California.
Milliken, R. T., R.T. Fitzgerald, M. G. Hylkema, R. Groza, T. Origer, D. G. Bieling, A. Leventhal, R. S.
Wiberg, A. Gottsfield, D. Gillette, V. Bel
lifemine, E. Strother, R. Cartier, and D. A.
Fredrickson
.
2007
.
Punctuated Cultural Change in the San Francisco Bay Area. In California Prehistory: Colonization, Culture, and Complexity. Edited by Terry L. Jones and Kathryn A.
Klar. AltaMira Press.
Morat
to, Michael J.
1984
.
California Archaeology. Orlando, Florida: Academic Press, Inc.
National Park Service
.
1983
.
Archaeology and Historic Preservation: Secretary of the Interior’s Standards and Guidelines. Electronic document, online at http://www.nps.gov/
history/local
-
law
-
Arch_Standards.htm, accessed December 6, 2011.
Nevin, David
.
1978
.
The Mexican War. Time Life Books.
Poole, Jean Bruce
.
2002
.
El Pueblo
-
The Historic Heart of Los Angeles. Los Angeles: The Getty Conservation Institute and the J Paul Getty Museum.
Ragir, Sonia
.
1972
.
The Early Horizon in Central California Prehistory. Contributions of the University of California Archaeological Re
search Facility, No. 15. Berkeley.
Rolle, Andrew
.
2003
.
California: A History. Arlington Heights, Illinois: Harlan Davidson, Inc.
Shumway, Burgess McK.
2007
.
California Ranchos: Patented Private Land Grants Listed by County.
Michael Burgess and Mary Wicki
zer Burgess, eds. Rockville, Maryland: Borgo Publishing Press.
Watt
Laura, Marie Galvin, David Blau, Charlane Gross, Aki Omi, and Donna Plunkett, and Lou Ann Speulda
-
Drews
.
n.d.
Historic American Landscapes Survey Alviso Salt Works HALS No. CA -
92. References
Draft Environmental Impact Report
7 -
3 http://l
cweb2.loc.gov/master/pnp/habshaer/ca/ca4000/ca4062/data/ca4062data.pdf.
Accessed September 9, 2020.
Workman, Boyle
.
1935
.
The City that Grew. Los Angeles, California: The Southland Publishing Company.
Alternatives
Department of Toxic Substances Control (D
TSC). 2021. EnviroStor [map database]. Retrieved on
February 9, 2021, from
https://www.envirostor.dtsc.ca.gov/public/
Hayward, City of. 2020. Vehicle Miles Traveled 2020 database. https://maps.hayward
-
ca.gov/portal/apps/webappviewer/index.html?id=b5a75035f77e4d80972424580c636354
(accessed January 2021).
Historic Aerials. 2021. Historic Aerials by NETRONLINE [map database of aerial photography].
Retrieved on January 6, 2021, from
https://www.historicaerials.com/viewer
State Water Resources Control Boar
d (SWRCB). 2021. GeoTracker [map database]. Retrieved on February 9, 2021, from
https://geotracker.waterboards.ca.gov/
U.S. Fish and Wildlife Service. 2020. National Wetlands Inventory: Surface Waters and Wetlands [map database]. Retrieved on January 22, 2
021, from
https://www.fws.gov/wetlands/data/mapper.html
7.2 List of Preparers
This EIR was prepared by the City of
Hayward
, with the assistance of Rincon Consultants, Inc.
Consultant staff involved in the preparation of the EIR are listed below.
R
INCON
C
ONSULT
ANTS
,
I
NC
.
Abe Leider, AICP CEP
, Principal
George Dix, Project Manager
Katherine Green,
AICP,
Assistant Project Manager
Beth Wilson, Environmental Planner
Kari Zajac, MESM, Senior Planner
Hannah Haas, MA, RPA,
Senior Archaeologist
James Williams, Architec
tural Historian
Steven Treffers,
Senior Architectural Historian
Allysen Valencia, GIS Analyst
K
ITTELSON
&
A
SSOCIATES
,
I
NC
.
Damian Stefanakis
Fernando Sotelo
City of Hayward
4350 Point Eden Way Industrial
Development Project
7 -
4 This page
intentionally left blank
415
0 Point Eden Way
Ind
ustrial Development Project
Fi
nal Environmental Impact Report
Re
sponse to Comments Document
SC
H# 2020110180
p
repared by
City of Ha
yward
777
B Street
Ha
yward, California 94541
Contact: Leigh
a Schmidt, Senior Planner
p
repared with the assistance of
Rincon
Consultants, Inc.
449 15th S
treet, Suite 303
Oak
land, California 94612
June 20
21 ATTACHMENT VIII
4 1
50 Point Eden Way
Industrial Development Project
Final
Environmental Impact Report
Response to Comments Document
SCH# 2020110180
prepared by
City of Hayward
777 B Street
Hayward, C
alifornia
94541
Contact: Leigha Schmidt, Senior Planner
prepared with the assistance of
Rincon Consultants, Inc.
449
15th Street, Suite 303
Oakland, California 94612
June
202
1 This report prepared on 50% recycled paper with 50% post -
consumer content
.
Final Environmental Impact Report
Response to C
o
mment
s Document
1 I
ntroduction
1. 1
Purpose of the Response to Comments Document
This Response to Comments (RTC) document provides response s
to public and agency
written
comments received by the
City of
Hayward
on the Draft Environmental Impact Report (EIR) for the
proposed
4150 Point Eden Way Industrial
Development Project
(project).
The Draft EIR identifies the
likely environmental consequences associated with development of the proposed project and recommends
mitigation measures to reduce potentially significant impacts.
In addition to providing
responses to public and agency
comments
received on the Draft EIR, this RTC document also makes revisions to the Draft EIR, as necessary, in response to those comments or to make clarifications to
information presented
in the Draft EIR.
This document, together with the Draft EIR, constitutes the Final EIR for the proposed projec
t.
1. 2
Environmental Review Process
Pursuant
to the California Environmental Quality Act (CEQA), lead agencies are required to consult with public agencies having jurisdiction over a propose d project and to provide the general public
with an opportunity to comment on the Draft EIR.
On
November 10, 2020
, the City of
Hayward
circulated a Notice of Preparation (NOP)
and Initial
Study
for a 30
-
day period to identify
environmental issue areas pote
ntially affected
if the p
roposed
project
were to be implemented
.
The
NOP was mailed
or otherwise provided
to public agencies
,
the
State Clearinghouse, organizations, and individuals considered likely to be interested in the proposed project and its potenti
al impacts. Comments received by the City of
Hayward
on the NOP
and Initial Study
are
provided in Appendix A of the Draft EIR and are
summarized in Table
1 -
1 of the
Draft EIR
. These comments
were taken into account
during the preparation of the Draft EIR.
The Draft EIR was made available for public review on
April 9
, 20
2 1, and was distributed to local and
State agencies. Copies of the Notice of Availability of the Draft EIR were mailed to a list of interested partie
s, groups and public agencies, as well as property owners and occupants of neighboring and nearby properties. The Draft EIR and an announcement of its availability were posted electronically on the
City’s
website, and a paper copy was available for public
review at
City
Hall
.
The Notice of
Availability of the Draft EIR was also posted at the office of the Alameda
County Clerk
, and the Draft
EIR was available
for public review
at the
Hayward
Public Library
.
The 45
-
day CEQA public comment period began on
Apri
l 9
and ended on
May 24
, 20
2 1. The City of
Hayward
received
five
comment letters on the Draft EIR. Copies of written comments on the Draft EIR received during the comment period
, as well as responses to those comments,
are included in
Section
3 of this d
ocument.
1.3 Document Organization
This
RTC
document consists of the following sections:
1 City of Hayward
4150 Point Eden Way Industrial Development Project
Final Environmental Impact Report
Response to Comments D
ocument
Section
1: Introduction.
This
section
discusses the purpose and organization of this RTC
Document and the Final EIR, and summarizes the environmental review proces s for the
project.
Section
2 :
List of Commenters.
This
section
contains a list of the agencies
and
private groups
and
organizations
that submitted written comments during the public review period on the Draft EIR.
No c
omment
s
were
received from
individuals
.
Section
3: Comments and Responses.
This
section
contains reproductions of all comment
letters received on the Draft EIR. A written response for each CEQA -
related comment
received during the public review period is provided. Each response is keyed to the c
orresponding comment.
Section 4: Draft EIR Revisions.
Revisions
to the Draft EIR that are necessary in light of the
comments received and responses provided, or necessary to amplify or clarify material in the Draft EIR, are contained in this
section
. Und
erlined text represents language that has
been added to the Draft EIR; text with strikeout has been deleted from the Draft EIR.
2 Final Environmental Impact Report
Response to Comments Document
2 List of Commenters
This section
presents a list of comment letters received during the public review period and describes the organization of the letters and comments that are provided in Section 3 ,
Comments
and Responses
, of this document.
2.1 Organization of Comment
Letters and Responses
The
five
letters are presented in the following order: State agencies ( 1 ), regional and local public
agencies (
2 ), and private groups and organizations (
2 ).
No
federal agencies and no
i
ndividuals
provided written comments
.
Each commen
t letter has been numbered sequentially and each
separate issue raised by the commenter has been assigned a number. The responses to each comment identify first the number of the comment letter, and then the number assigned to each issue. For example, Resp
onse 1.1 indicates that the response is for the first issue raised in comment Letter
1. 2.2
Comments Received
The following letters were submitted to the City during the public review period :
Letter Number and Commenter
Agency/ Group/ Organization
Page
Number
State
Agencies
1. Mark Leong
,
District Branch Chief
California Department of Transportation
5 Regional and
Local
Agencies
2. Laura J. Hidas
, Manager
of Water Resources
Alameda County Water District
10 3.
Chantal Alatorre
,
Senior
Planner
East Bay Regional Park District
14 Private Groups and Organizations
4. Carin High, Committee Co
-
Chair
Citizens Committee to
Complete the
Refuge
16 5.
Paige Fennie
Lozeau Drury LLP
80 Final Environmental Impact Report
Response to C
o
mment
s Document
3 Comments and Responses
Written responses to each comment letter received on the Draft EIR are provided in this section
. All
letters received during the public review period on the Draft EIR are provided in their entirety.
Please note that text within individual letters that has not been numbered does not specifically raise
environmental issues nor relate directly to the adequacy of the information or analysis within the Draft EIR, and therefore no comment is enumerated or response required, p
ursuant to
State
CEQA
Guidelines
Secti
on
s
15088 and
15132.
Revisions to the Draft EIR necessary in light of the comments received and responses provided, or necessary to amplify or clarify material in the Draft EIR, are included in the responses.
Underlined
text represents language that has been added to the Draft EIR; text with strikeout
has been deleted
from the Draft EIR.
All revisions are then compiled in the order in which they would appear in the Draft EIR (by page number) in Section
4,
Draft EIR
Tex
t Revisions
, of this document. Page numbers
cited in this section correspond to the page numbers of the Draft EIR. When mitigation measure language has been changed, it has been changed in both the text
on the stated Draft EIR page
and
the summary table (T
able 1) in the Executive Summary of the Draft EIR.
4 “Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
STATE OF CALIFORNIA
—
CALIFORNIA STATE TRANSPORTATION AGENC Y
GAVIN NEWSOM, Gove rnor
DEPARTMENT OF TRANSPORTATION
DISTRICT 4
OFFICE OF TRANSIT AND COMMUNITY PLANNING
P.O. BOX 23660, MS
-
10D
OAKLAND, CA 94623
-
0660
www.dot.ca.gov
Making Conservation
a California Way of Life.
May 24,
2021
SCH #:
202
0110180
GTS #:
04 -
ALA
-
2019
-
00581
GTS ID:
14875
Co/Rt/Pm:
AL/
92 /4.012
Leigha Schmidt, Senior Planner
Cit
y of Hayward
777 B
Street
Hayward, CA 94541
Re:
4150 Point Eden Way
+
Draft Environmental Impact Report (DEIR)
Dear
Leigha Schmidt
:
Thank you for including the California Department of Transportation (Caltrans) in the environmental review process for the
4150 Point Eden Way
project
. We are
committed to ensuring that impacts to the State’s multimodal transportation system and to our natural environment are identified and mitigated to support a safe, sustainable, integrated and efficient transportation system. The following c
omments are based on our review of the
Ma
y
2021
DEIR.
Project Understanding
The proposed project is located at 4150 Point Eden Way in Hayward , adjacent
to
State Route (
SR
)
-
92 . The site is divided into the eastern component and western component. The proposed
project consists of a new industrial building
on the eastern component of the project site and establishing a wetland preserve on the western component. The building would be used to house U -
Haul storage pods, materials and trucks and their regional corpor ate offices. The
San Francisco Bay Trail is located on the eastern edge of the eastern component of the project site. The proposed project includes a land swap for East Bay Regional Park District to relocate the Bay Trail from the current location along th
e eastern property line to meander along the southern property line and then to turn north to run along the western property line. The proposed project also includes establishing a preserve on the western component of the project site, which are currently
characterized by salt evaporation ponds from
the former salt production operation on the project site that would remain in place.
5 Leigha Schmidt, Senior Planner
May 24
, 2021
Page
2 “Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
Lead Agency
As the Lead Agency, the
City
of
Hayward
is responsible for all project mitigation,
including any needed improvem
ents to
SR
-
92. The project’s fair share
contribution, financing, scheduling, implementation responsibilities and lead agency monitoring should be fully discussed for all proposed mitigation measures.
Construction
-
Related Impacts
Potential impacts to the State Right
-
of
-
Way (ROW) from project
-
related
temporary access points should be analyzed. Mitigation for significant impacts due to construction and noise should be identified. Project work that require s
movement of oversized or excessive load vehicles on state roadways requires a transportation permit that is issued by Caltrans. To apply, visit:
https://dot.ca.gov/programs/traffic
-
operations/transportation
-
permits.
Prior to construction, coordination ma
y be required with Caltrans to develop a
Transportation Management Plan (TMP) to reduce construction traffic impacts to
SR
-
92 .
Encroachment Permit
Please be advised that any permanent work or temporary traffic control that encroaches onto the ROW require
s a Caltrans
-
issued encroachment permit. As
part of the encroachment permit submittal process, you may be asked by the Office of Encroachment Permits to submit a completed encroachment permit application package, digital set of plans clearly delineating th e State ROW,
digital copy of signed, dated and stamped (include stamp expiration date) traffic control plans, this comment letter, your response to the comment letter, and where applicable, the following items: new or amended Maintenance Agreement (MA), ap
proved Design Standard Decision Document (DSDD),
approved encroachment exception request, and/or airspace lease agreement.
Your application package may be emailed to
[email protected]
.
To download the perm
it application and to obtain more information on all
required documentation, visit
https://dot.ca.gov/programs/traffic
-
operations/ep/applications
.
Equitable Access
If any Ca
ltrans facilities are impacted by the project, those facilities must meet American Disabilities Act (ADA) Standards after project completion. As well, the project must maintain bicycle and pedestrian access during construction. These access considerations
support Caltrans’ equity mission to provide a safe,
sustainable, and equitable transportation network for all users.
6 Leigha Schmidt, Senior Planner
May 24
, 2021
Page
3 “Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
Thank
y
ou
again for including Caltrans in the environmental review process.
Should you have any questions regarding this letter, please c ontact
Laurel Sears
at
[email protected]
. Additionally, for future notifications and requests for review of new projects, please contact
LDIGR
-
[email protected]
.
Sincerely,
MARK LEONG
District Branch Chief
Local Development
-
Intergovernmental Review
c: State Clearinghouse
7 Final Environmental Impact Report
Res
ponse to Comments Document
Letter
1 COMMENTER:
Mark Leon
g
,
District Branch Chief
,
California Department of Transportation
DATE:
May 24
, 20
2 1
Response
1 .1
The commenter
states
their understanding of the proposed project in
the form of
a summary
.
The commenter
’
s understanding of the proposed project is an accura
te summary of the project as
proposed and evaluated in the Draft EIR
.
This comment is noted and does not require revisions to the Draft EIR.
Response
1 .
2 The commenter
states that as the lead agency, the City of Hayward is responsible for project mitigation, including improve
ment
s to State Route 92
, and that
m
itigation measures should be
described in full, including project fair
-
share contributions, scheduling, implementation, and
monitoring.
CEQA requires lead agencies to mitigate or avoid potenti ally significant environmental impacts to
the extent feasible. Pursuant to CEQA Guidelines Section 15064.3(a), except for certain roadway capacity projects, a project’s effects on automobile delay shall not constitute a significant environmental effect. Ac
cordingly, the Draft EIR does not include mitigation requiring improvements to State Route 92 because there would be no CEQA -
related significant impacts to
State Route 92. Table ES
-
1 in the Executive Summary of the Draft EIR lists the required project miti
gation measures. As shown in Table ES
-
1, there are no mitigation measures pertaining to State Route 92.
There are also no project mitigation measures containing fair -
share contribution
requirements.
CEQA Guidelines Section 15097 requires the City, in its r ole as lead agency, to adopt a Mitigation
Monitoring and/or Reporting Program (MMRP). Accordingly, the City must adopt a MMRP for the project, if the Final EIR is certified and the project approved. The MMRP will list each requirement mitigation measure co
ntained in either the Draft EIR or the Initial Study, as well as the timing for implementation, monitoring requirements, and reporting requirements, as applicable. The MMRP will also identify the agency, organization or otherwise, responsible for carrying out the identified
mitigation measures.
This comment is noted and does not require revisions to the Draft EIR.
Response
1 .
3 The commenter
states
an opinion
that potential impacts of temporary access points from State right
-
of
-
way should be analyzed, and mi
tigation for significant impacts due to construction and noise should be identified. The commenter also states that use of state roadways by oversized or excessive load vehicles
for project construction requires a permit.
The proposed project does
not
incl
ude temporary access to the project site from State right -
of
-
way,
such as the right
-
of
-
way for State Route 92.
Construction access, as well as access during project
operation, would be from Point Eden Way, which is not a State roadway. While temporary acce ss
points from State Route 92 would not be required for construction, construction equipment would 8 City of Hayward
4150 Point Eden Way Industrial Development Project
Final Environmental Impact Report
Response to Comments D
ocument
be hauled or delivered to the project site on the surrounding roadway network, including State Route 92. The project applicant would be responsible for obtai ning all regulatory permits and
approvals, including permits from Caltrans for the use of oversized or excessive load vehicles on State roadways.
Both the Initial Study and the Draft EIR evaluate the potential impacts of the entire proposed project, includ
ing project construction and project operation.
The analysis in the Initial Study and
Draft EIR identified both less
-
than
-
significant and significant
-
but
-
mitigable impacts related to
project construction. For example,
noise impacts of project construction
are analyzed on pages 83
through 90 of the Initial Study, which is included as Appendix A to the Draft EIR. As described therein, there would be no significant noise impacts resulting from project construction. Because noise impacts would be less than sign
ificant, no mitigation is required.
Therefore,
as construction impacts are analyzed and mitigated to the extent feasible and applicant in the Draft EIR,
no additional revisions to the Draft EIR are necessary in response to this comment.
Response
1 .
4 The co
mmenter
states that
coordination with Caltrans to develop a Transportation Management Plan may be required to reduce construction traffic impacts to State Route 92 .
This comment does not pertain to the Draft EIR or CEQA. Therefore, no additional revisions to the
Draft EIR are necessary in response to this comment. However, for informative purposes, as stated in Response 1.3 above, the project applicant would be responsible for obtaining all regulatory permits and approvals, including permits and approvals f rom Caltrans.
Response
1 .
5 The commenter
states that project traffic control measures within State roadway right -
of
-
way
require a Caltrans
-
issued encroachment permit.
This comment does not pertain to the Draft EIR or CEQA. Therefore, no additional revisions to the
Draft EIR are necessary in response to this comment. However, for informative purposes, as stated in Response 1.3 above, the project applicant would be responsible for obtaining all regulatory permits and approvals, including pe
rmits and approvals from Caltrans.
Response
1 .
6 The commenter
states that Caltrans facilities impacted by the project must meet American with Disabilities Act (ADA) standards after project completion, and bicycle and pedestrian access must be maintained du
ring construction.
The proposed project does not include modifications or changes to Caltrans facilities. The project is in proximity to State Route 92 and a land parcel known as Caltrans Pond. However, as described in Section 2,
Project Description
, of th
e EIR, no work or project activities are proposed within the State Route 92 right
-
of
-
way or on the Caltrans Pond property.
Therefore, no pedestrian or bicycle access
on Caltrans facilities would be affected by the proposed project.
This comment is noted an
d does
not require revisions to the Draft EIR.
9 D
IRECTORS
A
Z
I
Z
A
K
B
A
R
I
J
A
M
E
S
G
.
G
U
N
T
H
E
R
J
U
D
Y
C
.
H
U
A
N
G
P
A
U
L
S
E
T
H
Y
J
O
H
N
H
.
W
E
E
D
4 3
8 8
5 S
O
U
T
H
G
R
I
M
M
E
R
B
O
U
L
E
V
A
R
D
•
F
R
E
M
O
N
T
,
C
A
L
I
F
O
R
N
I
A
9 4
5 3
8 (510)
66 8
-
420
0 •
F
A
X
(
5 1
0 )
7 7
0 -
1 7
9 3
•
www.acwd.org
MANAGEMENT
R
O
B
E
R
T
S
H
A
V
E
R
G
e
n
e
r
a
l
M
a
n
a
g
e
r
K
U
R
T
A
R
E
N
D
S
O
p
e
r
a
t
i
o
n
s
a
n
d
M
a
i
n
t
e
n
a
n
c
e
L
A
U
R
A
J
.
H
I
D
A
S
W
a
t
e
r
R
e
s
o
u
r
c
e
s
E
D
S
T
E
V
E
N
S
O
N
E
n
g
i
n
e
e
r
i
n
g
a
n
d
T
e
c
h
n
o
l
o
g
y
S
e
r
v
i
c
e
s
J
O
N
A
T
H
A
N
W
U
N
D
E
R
L
I
C
H
Finance
M
a
y
2
,
2 0
2 1
VIA
E
L
E
C
TRONIC
M
AIL
L
e
i
g
h
a
S
c
h
m
i
d
t
C
i
t
y
o
f
H
a
y
w
a
r
d
,
P
l
a
n
n
i
n
g
D
i
v
i
s
i
o
n
7 7
7 B
S
t
r
e
e
t
Hayward,
C
A
9 4
5 4
1 Dear
M
s
.
S
c
h
m
i
d
t
:
S
u
b
j
e
c
t
:
N
o
t
i
c
e
o
f
Availability
o
f
a
Draft
E
n
v
i
r
o
n
m
e
n
t
a
l
I
m
p
a
c
t
R
e
p
o
r
t
for
the
4 1
5 0
P
o
i
n
t
E
d
e
n
Way
Industrial
D
evelopment
P
roject
,
H
a
y
w
a
r
d
T
h
e
A
l
a
m
e
d
a
C
o
u
n
t
y
W
a
t
e
r
D
i
s
t
r
i
c
t
(
A
C
W
D
)
w
i
s
h
e
s
t
o
t
h
a
n
k
y
o
u
f
o
r
t
h
e
o
p
p
o
r
t
u
n
i
t
y
t
o
c
o
m
m
e
n
t
o
n
t
h
e
N
o
t
i
c
e
o
f
A
v
a
i
l
a
b
i
l
i
t
y
o
f
a
Dr
aft
E
n
v
i
r
o
n
m
e
n
t
a
l
I
m
p
a
c
t
R
e
p
o
r
t
(
E
I
R
)
f
o
r
t
h
e
4 1
5 0
P
o
i
n
t
E
d
e
n
W
a
y
I
n
d
u
s
t
r
i
a
l
D
e
v
e
l
o
p
m
e
n
t
P
r
o
j
e
c
t
(
P
r
o
j
e
c
t
)
.
ACWD
h
a
s
r
eviewed
t
he
Draft
E
IR
a
n
d
o
f
f
e
r
s
t
h
e
f
o
l
l
o
w
i
n
g
c
o
m
m
e
n
t
s
f
o
r
y
o
u
r
c
o
n
s
i
d
e
r
a
t
i
o
n
:
1. H
a
z
a
r
d
s
a
n
d
H
a
z
a
r
d
o
u
s
M
a
t
e
r
i
a
l
s
:
a.
P
a
g
e
s
4 .
3 -
1 4
a
n
d
4 .
3 -
1 5
o
f
t
h
e
D
r
a
f
t
E
I
R
s
t
a
t
e
,
“
I
n
t
h
e
e
v
e
n
t
t
h
a
t
d
i
s
t
u
r
b
e
d
s
o
i
l
a
p
p
e
a
r
s
t
o
c
o
n
t
a
i
n
c
o
n
t
a
m
i
n
a
n
t
s
o
f
p
o
t
e
n
t
i
a
l
c
o
n
c
e
r
n
(
C
O
P
C
s
)
,
s
u
c
h
a
s
o
d
o
r
s
,
s
t
a
i
n
i
n
g
,
a
n
d
/
o
r
d
i
s
c
o
l
o
r
a
t
i
o
n
,
w
o
r
k
s
h
o
u
l
d
h
a
l
t
i
n
t
h
a
t
a
r
e
a
a
n
d
a
n
e
n
v
i
r
o
n
m
e
n
t
a
l
p
r
o
f
e
s
s
i
o
n
a
l
(
E
P
)
,
s
u
c
h
a
s
a
g
e
o
l
o
g
i
s
t
,
e
n
g
i
n
e
e
r
,
i
n
d
u
s
t
r
i
a
l
h
y
g
i
e
n
i
s
t
,
o
r
e
n
v
i
r
o
n
m
e
n
t
a
l
h
e
a
l
t
h
s
p
e
c
i
a
l
i
s
t
w
i
t
h
e
x
p
e
r
t
i
s
e
i
n
t
h
e
s
e
m
a
t
t
e
r
s
,
s
h
a
l
l
b
e
c
a
l
l
e
d
t
o
t
h
e
s
i
t
e
t
o
o
v
e
r
s
e
e
t
h
e
w
o
r
k
a
n
d
d
e
t
e
r
m
i
n
e
s
a
f
e
c
o
n
s
t
r
u
c
t
i
o
n
a
n
d
s
o
i
l
h
a
n
d
l
i
n
g
p
r
o
c
e
d
u
r
e
s
,
”
a
n
d
“
I
f
g
r
o
u
n
d
w
a
t
e
r
i
s
e
n
c
o
u
n
t
e
r
e
d
w
i
t
h
i
n
t
h
e
f
o
r
m
e
r
r
e
m
e
d
i
a
t
i
o
n
a
r
e
a
d
u
r
i
n
g
c
o
n
s
t
r
u
c
t
i
o
n
o
f
t
h
e
p
r
o
j
e
c
t
,
a
s
s
h
o
w
n
o
n
F
i
g
u
r
e
4 o
f
t
h
e
R
M
P
,
a
n
E
P
s
h
a
l
l
b
e
c
a
l
l
e
d
t
o
t
h
e
s
i
t
e
t
o
d
e
t
e
r
m
i
n
e
s
a
f
e
h
a
n
d
l
i
n
g
p
r
o
c
e
d
u
r
e
s
.
”
ACWD
r
e
q
u
e
s
t
s
t
h
a
t
t
h
e
E
I
R
a
l
s
o
i
n
c
l
u
d
e
a
p
r
o
v
i
s
i
o
n
t
h
a
t
P
r
o
j
e
c
t
p
r
o
p
o
n
e
n
t
s
r
e
p
o
r
t
a
n
d
c
o
o
r
d
i
n
a
t
e
w
i
t
h
t
h
e
S
a
n
F
r
a
n
c
i
s
c
o
B
a
y
R
e
g
i
o
n
a
l
W
a
t
e
r
Q
u
a
l
i
t
y
C
o
n
t
r
o
l
B
o
a
r
d
(
R
e
g
i
o
n
a
l
B
o
a
r
d
)
and
A
C
W
D
a
s
s
o
o
n
a
s
p
o
s
s
i
b
l
e
i
f
s
o
i
l
a
n
d
/
o
r
g
r
o
u
n
d
w
a
t
e
r
c
o
n
t
a
m
i
n
a
t
i
o
n
i
s
encountered.
b.
P
a
g
e
4 .
3 -
1 4
o
f
t
h
e
D
r
a
f
t
E
I
R
s
t
a
t
e
s
,
“
S
o
i
l
e
x
c
a
v
a
t
e
d
f
r
o
m
d
e
e
p
e
r
t
h
a
n
5 -
f
e
e
t
b
e
l
o
w
g
r
o
u
n
d
surf
a
c
e
i
n
t
h
e
r
e
s
t
r
i
c
t
e
d
a
r
e
a
s
h
a
l
l
o
n
l
y
b
e
r
e
u
s
e
d
o
n
-
s
i
t
e
a
s
b
a
c
k
f
i
l
l
a
f
t
e
r
s
a
m
p
l
i
n
g
a
n
d
a
n
a
l
y
s
i
s
s
o
i
l
p
r
o
v
e
s
t
h
e
s
o
i
l
i
s
a
c
c
e
p
t
a
b
l
e
t
o
r
e
m
a
i
n
o
n
s
i
t
e
.
C
o
m
m
e
r
c
i
a
l
E
S
L
s
s
h
a
l
l
b
e
u
s
e
d
a
s
t
h
e
t
h
r
e
s
h
o
l
d
t
o
d
e
t
e
r
m
i
n
e
i
f
s
o
i
l
s
m
a
y
r
e
m
a
i
n
o
n
s
i
t
e
o
r
r
e
q
u
i
r
e
o
f
f
-
sit
e
disposal.”
A
C
W
D
r
e
c
o
m
m
e
n
d
s
t
h
a
t
t
h
e
R
e
g
i
o
n
a
l
B
o
a
r
d
’
s
C
h
a
r
a
c
t
e
r
i
z
a
t
i
o
n
a
n
d
R
e
u
s
e
o
f
P
e
t
r
o
l
e
u
m
2.1 2.2
Letter 2
10 C
i
t
y
o
f
H
a
y
w
a
r
d
P
a
g
e
2 M
a
y
2
,
2 0
2 1
H
y
d
r
o
c
a
r
b
o
n
I
m
p
a
c
t
e
d
S
o
i
l
a
n
d
I
n
e
r
t
W
a
s
t
e
(
O
c
t
o
b
e
r
2 0
0 6
)
1 t
e
c
h
n
i
c
a
l
r
e
f
e
r
e
n
c
e
d
o
c
u
m
e
n
t
b
e
a
p
p
l
i
e
d
t
o
all
r
e
u
s
e
o
f
o
n
s
i
t
e
i
m
p
a
c
t
e
d
s
o
i
l
.
A
s
o
i
l
s
a
m
p
l
i
n
g
p
l
a
n
d
e
s
c
r
i
b
i
n
g
t
h
e
s
a
m
p
l
i
n
g
m
e
t
h
o
d
,
s
a
m
p
l
i
n
g
f
r
e
q
u
e
n
c
y
,
a
n
a
l
y
t
i
c
a
l
m
e
t
h
o
d
s
,
a
n
d
s
o
i
l
p
l
a
c
e
m
e
n
t
,
f
o
r
a
n
y
p
o
t
e
n
t
i
a
l
l
y
i
m
p
a
c
t
e
d
s
o
i
l
p
r
o
p
o
s
e
d
f
o
r
r
e
u
s
e
,
s
h
o
u
l
d
b
e
s
u
b
m
i
t
t
e
d
t
o
t
h
e
R
e
g
i
o
n
a
l
B
o
a
r
d
f
o
r
r
e
v
i
e
w
a
n
d
a
p
p
r
o
v
a
l
.
2. H
y
d
r
o
l
o
g
y
a
n
d
W
a
t
e
r
Q
u
a
l
i
t
y
:
P
a
g
e
4 .
3 -
1 6
o
f
t
h
e
D
r
a
f
t
E
I
R
s
t
a
t
e
s
,
“
M
i
t
i
g
a
t
i
o
n
M
e
a
s
u
r
e
s
HAZ
-
2 b
a
n
d
H
A
Z
-
2 c
w
o
u
l
d
r
e
q
u
i
r
e
c
o
o
r
d
i
n
a
t
i
o
n
w
i
t
h
l
o
c
a
l
a
g
e
n
c
i
e
s
t
o
e
n
s
u
r
e
t
h
a
t
g
r
o
u
n
d
w
a
t
e
r
q
u
a
l
i
t
y
i
s
p
r
o
t
e
c
t
e
d
a
n
d
r
e
d
u
c
e
t
h
e
e
n
v
i
r
o
n
m
e
n
t
a
l
i
m
p
a
c
t
a
s
s
o
c
i
a
t
e
d
w
i
t
h
t
h
e
e
x
i
s
t
i
n
g
c
o
n
t
a
m
i
n
a
t
i
o
n
t
h
a
t
m
a
y
b
e
a
f
f
e
c
t
e
d
b
y
t
h
e
b
i
o
r
e
t
e
n
t
i
o
n
b
a
s
i
n
a
n
d
t
h
a
t
t
h
e
d
i
s
p
l
a
c
e
m
e
n
t
p
i
e
r
s
b
e
d
e
s
i
g
n
e
d
a
n
d
c
o
n
s
t
r
u
c
t
e
d
t
o
r
e
s
u
l
t
i
n
a
l
e
s
s
t
h
a
n
s
i
g
n
i
f
i
c
a
n
t
i
m
p
a
c
t
.
”
ACWD
a
p
p
r
e
c
i
a
t
e
s
t
h
e
i
n
c
l
u
s
i
o
n
o
f
t
h
e
s
e
m
i
t
i
g
a
t
i
o
n
m
e
a
s
u
r
e
s
t
o
e
n
s
u
r
e
g
r
o
u
n
d
w
a
t
e
r
p
r
o
t
e
c
t
i
o
n
a
s
o
u
t
l
i
n
e
d
i
n
o
u
r
D
e
c
e
m
b
e
r
9 ,
2 0
2 0
,
letter.
3. A
C
W
D
C
o
n
t
a
c
t
s
:
T
h
e
f
o
l
l
o
w
i
n
g
A
C
W
D
c
o
n
t
a
c
t
s
a
r
e
p
r
o
v
i
d
e
d
s
o
t
h
a
t
t
h
e
C
i
t
y
o
f
Hayward
c
a
n
c
o
o
r
d
i
n
a
t
e
w
i
t
h
A
C
W
D
a
s
n
e
e
d
e
d
d
u
r
i
n
g
t
h
e
C
E
Q
A
p
r
o
c
e
s
s
: