g. At all times during the holding of any dance or event, all doors leading from or opening into the place where the danceevent is held, are to remain unlocked, unbarred, or unfastened. h. No return check shall be issued.
SEC. 6-2.28 LICENSEE/PERMITTEE RESPONSIBLE FOR VIOLATIONS.
The licensee of any cabaret or permittee for any cabaret or public dance event shall comply with all generally applicable state and local laws and regulations, andbe responsible for all violations of shall comply with the laws of the State of California, and or of the ordinances, regulations and conditions of the City of Hayward that relate to the operation of a cabaret, which occur within the cabaret, whether or not the violations occur within the licensee's/permittee's presence or with the licensee's/permittee's knowledge. The licensee/permittee agrees that allowing more patrons on the premises than that authorized by the Hayward Fire Marshal constitutes a violation of the license and may be enforced by the Police Department.
SEC. 6-2.29 VIOLATION OF STATE AND CITY LAWS.
No licensee (or its agents or employees) nor permittee (or its agents or employees) shall engage in or permit any other person on such premises to engage in any act in violation of the laws of the State of California or of the ordinances, regulations and conditions of the City of Hayward.
SEC. 6-2.30 PATRON SAFETY AND SECURITY.
The licensee/permittee shall be responsible for the security and safety of patrons in the cabaret in and around off-street parking areas. Security shall meet the following performance standards:
a. There shall be a minimum of one (1) security personnel on duty for the first fifty (50) patrons on site.
Once the number of patrons exceeds fifty (50), there shall be one (1) additional security personnel on duty for up to and including each additional fifty (50) patrons on site. "On-site" means all patrons within the establishment and waiting in line to enter the establishment. b. The security personnel shall be on duty when the entertainment begins or 9:00 p.m., whichever is earlier, and shall remain on duty for at least one-half hour after the establishment closes or until all patrons have vacated the area immediately surrounding the establishment and the parking sites used by the patrons.
c. The security personnel shall provide security inside the establishment, along the outer perimeter of the establishment and parking sites immediately adjacent to the establishment and used by the patrons. d. Security personnel shall use an ID scanner to verify authenticity of ID cards for all patrons who enter the business.
e.d. The security personnel, in coordination with the Hayward Police Department, shall remove all illegal contraband that may be found on patrons, report the existence of the contraband to the Hayward Police Department, identify the person in possession of the contraband and immediately turn the contraband over to the proper law enforcement authorities. f.e. All security personnel shall be registered and maintain valid registration status with the State of California's Department of Consumer Affairs. All security personnel shall be registered at a level that is equivalent to or greater than a proprietary private security officer. Proof of registration for all security personnel shall be maintained by the establishment's operator and shall consist of application forms, receipts for application fees and live scan fees and any other document showing evidence of valid registration.
524
Created: 2025-08-05 08:52:40 [EST]
(Supp. No. 25, Update 1)
g.f. At closing time, the security personnel shall ensure that the establishment's patrons have been cleared from the sidewalk and street areas in front of the establishment, from other areas around the perimeter of the establishment and from areas within one hundred fifty (150) feet of the establishment.
hg. While on duty, all security personnel shall wear a nameplate containing the security personnel's full name and the word "Security" printed in bold, capital letters that are at least three -fourths of one (1) inch high and in contrasting color. The nameplate shall be exhibited prominently on the clothing, at chest level, and shall be visible and easily read at all times. The nameplate shall be a minimum of two (2) inches high and four (4) inches wide. As an alternative to a nameplate, the security personnel's name and the word "Security" may be embroidered on the security personnel's outermost garment with the required information meeting the above specifications and located at chest level. ih. The establishment's operator shall not allow any security personnel to, and no security personnel shall, sit at the bar, or consume alcoholic beverages or any controlled substance, be under the influence of alcoholic beverages or any controlled substance, or engage in any violations of the law while on duty. ji. The establishment's operator shall not allow any security personnel to be, and no security personnel shall be, in possession of any firearm while on the establishment's premises without the security personnel having first obtained a license from the appropriate state or local agency authorizing the security personnel to be in possession of a firearm.
kj. If the establishment employs or otherwise engages security personnel who will be in possession of a firearm while on the establishment's premises, the security personnel shall provide the Chief of Police with the following documentation no less than fourteen (14) days prior to the date the security personnel will begin performing services at the establishment:
(1) A copy of the license issued to the security personnel authorizing the possession of such firearm; (2) A copy of the security personnel's law enforcement identification if employed by a law enforcement agency; and
(3) A copy of the security personnel's California driver's license or California identification card. lk. The establishment's operator shall at all times manage waiting lines outside the establishment to ensure that there are no impediments to pedestrian travel in the pedestrian walkway, no blockage of neighboring businesses, and no disturbance of the public peace. ml. At least one (1) person in possession of a valid cabaret license shall be present at the establishment at all times when entertainment requiring a cabaret license is being provided. Said licensee shall cooperate fully with the Chief of Police, or any City official responsible for enforcing the Alcoholic Beverage Outlet regulations, with any inquiry, inspection reasonable request or investigation necessary to implement the requirements of these regulations or to enforce any other state, local or federal law.
SEC. 6-2.31 POSTING OPERATING REGULATIONS.
A set of operating regulations in a form approved by the Chief of Police and containing the provisions of Sections 6-2.27 through 6-2.33 herein, as well as any relevant operating conditions that may be imposed by the Chief of Police, City Council or the Planning Commission, shall be prominently posted by licensee/permittee in at least one (1) conspicuous location within every cabaret, as determined by the Chief of Police.
SEC. 6-2.32 INSPECTION FOR ENFORCEMENT; SUMMARY SUSPENSION.
All premises operating pursuant to the terms of these regulations may be administratively inspected for violations of these regulations, without a warrant at any time during normal operating hours by the Chief of Police 525
Created: 2025-08-05 08:52:40 [EST]
(Supp. No. 25, Update 1)
of the City of Hayward or designee. Any evidence of any violation of the terms of these regulations that are observed during an inspection may be seized without warrant provided that such evidence shall be specifically identified and a receipt shall be given to the owner of such evidence and to the licensee of such premises or his agent. At all times, a designated manager or person in charge shall be on the premises and available to the Police Department. Evidence collected during an inspection may be used to support administrative enforcement proceedings under this Code or other applicable regulations. A violation of these Cabarets and Dances regulations may result in immediate closure by the Police Department, pursuant to the summary suspension provisions set forth in the Alcoholic Beverage Outlets regulations (Hayward Municipal Code Sections 10- 1.2750 et seq.).
SEC. 6-2.33 POWERS OF CHIEF OF POLICE AND OFFICERS.
The Chief of Police and his/her sworn officers shall have the power to stop any public dance or close any premises, whether a permit is issued hereunder or not, for disturbing the peace, disorderly conduct, obscene or indecent behavior, or for violation of any law or ordinance.
SEC. 6-2.34 INJUNCTIVE RELIEF; ADMINISTRATIVE CITATION.
In addition to the legal remedies provided for in this Code, the operation of any cabaret in violation of the provisions of these regulations or other applicable laws and regulations shall be deemed a public nuisance, and the City of Hayward may bring an action in any court of competent jurisdiction to enjoin such nuisance or issue an administrative citation pursuant to Chapter 1, Article 7 of this Code.
SEC. 6-2.35 VIOLATIONS; PENALTIES.
Any person violating any provision of these regulations or knowingly or intentionally misrepresenting to any officer or employee of the City any material fact in procuring the license or permit shall be punishable as set forth in Article 3 of Chapter 1 of this Code.
526
12 City of Hayward
Business Friendly Code Updates
Figure 1 Limited Access Commercial (CL) District
Attachment IV, Exhibit L
527
Analysis of Hayward Codes and Practices 13
Figure 2 Limited Access Commercial (CL) District
528
Analysis of Hayward Codes and Practices 15
Figure 3 Limited Access Commercial (CL) District
529
14 City of Hayward
Business Friendly Code Updates
Figure 4 Regional Commercial (CR) District
530
Address APN General Plan Designation Current Zoning District Proposed Zoning District 28505 HESPERIAN BLVD 456-0101-002-04 Retail and Office Commercial (ROC) Regional Commercial (CR) General Commercial (CG) 28509 HESPERIAN BLVD 456-0101-007-01 Retail and Office Commercial (ROC) Regional Commercial (CR) General Commercial (CG) 360 W A ST 431-0096-003-01 Commercial/High Desnity Residential (CHDR) Limited Access Commercial (CL) General Commercial (CG) 494 ROUSSEAU ST 078G-2723-009-00 Retail and Office Commercial (ROC) Limited Access Commercial (CL) General Commercial (CG) 410 W A ST 432-0036-004-05 Commercial/High Desnity Residential (CHDR) Limited Access Commercial (CL) General Commercial (CG) 430 W A ST 432-0032-004-04 Commercial/High Desnity Residential (CHDR) Limited Access Commercial (CL) General Commercial (CG) 450 W A ST 432-0032-003-02 Commercial/High Desnity Residential (CHDR) Limited Access Commercial (CL) General Commercial (CG) 500 W A ST 432-0032-002-04 Commercial/High Desnity Residential (CHDR) Limited Access Commercial (CL) General Commercial (CG) 22129 S GARDEN AVE 432-0032-005-02 Commercial/High Desnity Residential (CHDR) Limited Access Commercial (CL) General Commercial (CG) Attachment XI
561 W HARDER RD 443-0065-010-00 Retail and Office Commercial (ROC) Limited Access Commercial (CL) General Commercial (CG) W HARDER RD 454-0005-069-03 Limited Access Commercial (CL) General Commercial (CG) W HARDER RD 454-0005-069-04 Limited Access Commercial (CL) General Commercial (CG) W HARDER RD 454-0005-069-05 Limited Access Commercial (CL) General Commercial (CG) W HARDER RD 454-0005-069-02 Limited Access Commercial (CL) General Commercial (CG) 24438 SANTA CLARA ST 150 443-0015-006-03 Public and Quasi-Public (PQP) Limited Access Commercial (CL) General Commercial (CG) 300 W WINTON AVE 443-0015-001-05 Public and Quasi-Public (PQP) Limited Access Commercial (CL) General Commercial (CG) 28539 HESPERIAN BLVD 456-0101-009-13 Retail and Office Commercial (ROC) Regional Commercial (CR) General Commercial (CG) MARINA BLVD 456-0101-009-12 Retail and Office Commercial (ROC) Regional Commercial (CR) General Commercial (CG) 531
Written Public Correspondence
Business Friendly Hayward Project
Attachment V
532
September 25, 2025
Good evening Commissioners,
My name is Lesley Urista, owner of Puesto Market at 226 Jackson Street. I’m here regarding
Hayward Municipal Code Section 10-1.2759, which prevents new off-sale alcohol businesses within 500 feet of another.
Because my store is about 140 feet from a liquor store, I cannot move forward with my Type 20 Beer and Wine license application. The same denial happened in 2012 under a previous owner.
Since then, Hayward has grown by nearly 15,000 residents, and community needs have changed.
Puesto Market is not a liquor store. We are a family-owned grocery store, and my goal is to responsibly serve our customers and even partner with local wineries to highlight regional products.
I respectfully ask the Commission to consider updating this code so it better reflects today’s Hayward balancing safeguards while also supporting small businesses like mine. Thank you Sincerely,
--
Lesley Urista-Mendez. CFO
Puesto Markets. Inc
Correspondence Chain 1
533
From: Galvez, Janet
To: Elizabeth Blanton; Sachiko Riddle; ; Paul Nguyen; Daniel Mao Cc: Sidles, Philip
Subject: RE: Hayward Business Friendly Hayward Project
Date: Friday, January 9, 2026 1:21:28 PM
Attachments: image001.png
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Thank you, Elizabeth!
As always, I really appreciate your detailed and thoughtful responses. It has truly been a pleasure collaborating with you over the years.
Over the past few months, Prologis has been actively engaging with various stakeholders in Hayward. As part of that effort, we are reintroducing PLD to the City with the goal of being an active, long-term community member and owner. Most recently we attended District 2’s Annual Holiday Food & Toy Drive in December with a truck load of toys for the First Presbyterian Church, Glad Tiding Church, La Familia and Eden Youth.
Given the magnitude of our portfolio in Hayward and our ongoing focus on innovation, it’s important for us to stay apprised of proposed changes affecting the industrial zoning districts.So Yes, we would very much welcome the opportunity to participate in a focus group or community meeting tailored to industrial business owners and developers, particularly to review the specific changes being proposed to the Industrial District use table. That forum would be extremely helpful, and we appreciate you offering this opportunity.
P.S. Hi Lucy and Paul!
Thank you,
Janet
From: Elizabeth Blanton <[email protected]> Sent: Friday, January 9, 2026 12:41 PM
To: Galvez, Janet >
Cc: Sachiko Riddle <[email protected]>; Sidles, Philip < >; ; Paul Nguyen <[email protected]>; Daniel Mao
<[email protected]>
Subject: RE: Hayward Business Friendly Hayward Project
*EXTERNAL EMAIL*
CAUTION: This email originated from outside of Prologis. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Correspondence Chain 2
534
Hi Janet,
Happy New Year!
Yes, the Planning Commission work session is still scheduled for January 22, and we now also have a work session with the Council scheduled for the following week on January 27. The agenda packet for the Planning Commission work session should be published next week on the 15 th, and I’ll be sure to forward it to you when it goes out. The Council agenda packet should be published by January 23. While not on the calendar yet, we’re shooting to have final adoption hearings for the project in March or April.
Yes – your understanding is correct. What is being proposed is that moving forward, data centers would only be allowed in the General Industrial (IG) zoning district with approval of a CUP. They no longer would be allowed in other industrial or commercial districts, though existing and previously approved data centers would be “grandfathered” in.
To date, outreach to the business community has included an online survey, a meeting with the Downtown Hayward Improvement Association, an article in the STACK Extra citywide e- newsletter, as well as informal conversations about the project with businesses who contact the Planning Division about potential projects. For example, a few months ago, a data center project contact the City that was considering locations in the IP zoning district reached out to the City.
Once their inquiry was forwarded to Planning, I immediately let them know of the proposed zoning changes that were being considered and the approximate timing of when the new changes would go into effect. (Perhaps you are involved with this project and that’s how you became aware of the proposed changes?)
That said, I’m happy to set up a focus group or community meeting that is more tailored to our Industrial business owners and developers so we can review the specific changes proposed to the Industrial District use table. Let me know if you think this would be helpful. I’m copying Lucy Lopez from the Hayward Chamber and Paul Nguyen from Economic Development who can assist in getting the word out about such a focus group should we move forward with one.
Again, thanks for engaging on this.
Elizabeth
Elizabeth Blanton (she/her)
Senior Planner
Phone 510-583-4206 | Email
[email protected]
777 B Street, Hayward, CA 94544
535
Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Galvez, Janet
Sent: Wednesday, January 7, 2026 10:33 AM
To: Elizabeth Blanton <[email protected]> Cc: Sachiko Riddle <[email protected]>; Sidles, Philip > Subject: RE: Hayward Business Friendly Hayward Project
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Hi Elizabeth,
Happy New Year! I hope you’re doing well. I wanted to follow up on the note below and check whether the Planning Commission workshop is still tentatively scheduled for January 22? We’ve heard there may be some proposed updates to the industrial regulations. Our understanding is that, once adopted, data centers may only be permitted with approval of a CUP in the General Industrial (IG) zoning district, which would mean they would no longer be allowed in the IP zone?
Based on the information published to date, there appears to be limited detail available on this topic. At the August PC workshop, staff noted that outreach to industrial stakeholders had not been conducted, as the changes were not expected to impact industrial uses. However, the potential removal of data centers from the IP zone feels like a meaningful change.
Will staff be publishing any additional information or analysis regarding this proposed change ahead of the PC workshop to allow stakeholders an opportunity to review and provide comment? Thank you very much for your time and help, I really appreciate it! Janet
536
From: Elizabeth Blanton <[email protected]> Sent: Thursday, November 20, 2025 2:00 PM
To: Galvez, Janet >
Cc: Sachiko Riddle <[email protected]>
Subject: RE: Hayward Business Friendly Hayward Project
*EXTERNAL EMAIL*
CAUTION: This email originated from outside of Prologis. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Hi Janet,
Good to hear from you. We will add you to our mailing list. As of now, our next meeting is a Planning Commission workshop that is tentatively scheduled for January 22. The project webpage can be found here: https://www.hayward-ca.gov/your- government/departments/planning-division/business-friendly-hayward-project.
In the meantime, let me know if you have any questions or comments on the project.
Elizabeth
Elizabeth Blanton (she/her)
Senior Planner
Phone 510-583-4206 | Email
[email protected]
777 B Street, Hayward, CA 94544
Permit Center | E-Permits Portal | E-Permits Portal Help Center Please note: City Hall will close non-essential services during the week of Monday November 24, through November 28, 2025
. Inspections will not be scheduled during this time and will resume upon staff’s return to City Hall. Petitions, application submittals with required payment and resubmittals received by Wednesday, November 19, 2025 will be processed prior to the business closure; however, submittals/payments received between November 20 thru November 28, will be processed when offices reopen on Monday, December 1.
Submit your building plans early, building code is changing! New 2025 California Building Codes go in effect January 1, 2026.
537
From: Galvez, Janet >
Sent: Wednesday, November 12, 2025 2:53 PM
To: Elizabeth Blanton <[email protected]> Subject: Hayward Business Friendly Hayward Project
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Hi Elizabeth,
Hope you are well, can you add me to your distribution list for this initiative. Thank you! Janet Galvez | VP, Investment Officer
Pier 1, Bay 1 | San Francisco | California | 94111 | United States of America Direct | Mobile |
www.prologis.com | Follow us on LinkedIn and Facebook
The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer.
signature for Galvez, Janet
538
From: Kelly < >
Sent: Thursday, January 22, 2026 7:31 PM
To: Elizabeth Blanton <[email protected]>; Planning Division <[email protected]>
Cc: Sara Buizer <[email protected]>;
Francisco Zermeno <[email protected]>; Julie Roche <[email protected]>
Subject: Mercury News: PG&E Forecasts 975 MW of Hayward Data Centers, enough for 700,000 homes
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Dear Ms. Blanton,
Could you forward the Mercury News data center story and the BAAQMD Diesel Free Initiative to the Hayward Planning Commission? The Eden Landing data center will have 28 diesel generators (77 MW).
— Kelly
Mercury News: San Jose races to become Bay Area’s data center capital — PG&E customers could pay the price
City touts revenue from ‘AI revolution’
By Ethan Baron
December 21, 2025
https://www.mercurynews.com/2025/12/21/san-jose-races-to-become-bay-areas-data- center-capital-pge-customers-could-pay-the-price/
• In San Jose, PG&E has requests to supply electricity to 11 projects totaling 1,630 megawatts of capacity. This is enough capacity for 1.2 million homes, more than three times the number of housing units in San Jose... (around 330,000 households)I • In Hayward, PG&E has requests for four projects totaling 975 megawatts, enough for 700,000 homes. (Hayward only has 50,000 households or 14x fewer households than the proposed PG&E data center pipeline.)
Correspondence Chain 3
539
• [San Jose's] new 99-megawatt data center fully ramped up and running would provide an estimated $3.5 to $6.4 million annually in new property tax and utility user tax... ” a March memo to the City Council said.
Hayward Forecasts a $9 million/year Windfall from 77-MW Eden Landing • "[Hayward's] Utility User’s Tax alone is expected to bring in around $5,400,000 per year once all of the servers are up and running in 2029. The total tax benefit is estimated to be around $9,000,000 per year. " (This is Hayward's forecasted incremental revenue (property tax, sales/use tax on equipment, utility users tax, etc.) from the 77-MW STACK project.) https://haywardherald.substack.com/p/city- administration-in-historic-disarray
• Hayward's $9 million per year total tax benefit from a single 77-MW data center, nearly twice as much as the approximately $5 million a year of incremental revenue from San Jose's 99-MW data center. Did Hayward prepare a detailed forecast for expected revenue from the new Eden Landing data center similar to San Jose's forecast?
https://sanjose.legistar.com/View.ashx?M=F&ID=13933623&GUID=595A271F- 15B6-47D9-BC2C-1E2F8B39F806
BAAQMD's Initiative signed by a county supervisor
540
541
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 1 January 22, 2026
City of Hayward Planning Commission
Attn: City Clerk
777 B. Street
Hayward, CA 94541
Email: [email protected]
Re: Agenda Item No. 2: Work Session: Proposed Municipal Code and Zoning Map Revisions Related to the Business-Friendly Hayward Project Honorable Planning Commissioners:
Thank you for the opportunity to comment on the City of Hayward’s (“City’s”) proposed amendments to the Zoning Code and Zoning Map as part of the Business-Friendly Hayward Project (“Proposed Amendments”). Founded and still deeply rooted in the Bay Area, Prologis is a global and local leader in logistics, data center, energy, and mobility real estate, and a long- standing owner and operator of industrial real estate in Hayward. For over 40 years, Prologis has partnered with the City to deliver three million square feet of logistics and industrial facilities in 37 buildings. In 2024, Prologis’s holdings in the City yielded $8.8 million in property taxes, $440 million in property investment (with a direct impact of $528 million and an indirect impact of $306 million), and 4,550 direct, indirect, and induced jobs. Prologis also has a strong track record in its commitment to sustainability, innovation, and economic vitality. In 2025, Prologis reached over one gigawatt (“GW”) of installed solar and energy storage and set an ambitious goal to achieve net zero across its value chain by 2040, with 195 million square feet of sustainably certified space already in place.
Prologis has been following Hayward’s current fiscal challenges and supports the City’s strategic initiative to attract new investment and strengthen the local economy. We appreciate the City’s efforts to modernize and streamline its zoning framework in a manner that supports economic vitality, environmental stewardship, and compatibility with surrounding uses. We are concerned, however, that the Proposed Amendments related to industrially zoned properties and data centers (“Proposed Industrial Amendments”) will impede—not facilitate—new businesses and economic investment in the City. In that spirit, we respectfully offer the following observations regarding the proposed changes affecting data center uses in industrial zoning districts, which are more thoroughly discussed in the attached detailed comments. • The proposed prohibition of data centers in the IP (Industrial Park) district, and limitation of such use exclusively to the IG (Industrial General) district, could unintentionally conflict with the Business-Friendly Hayward Project’s stated objectives by constraining investment in the City’s existing underutilized industrial areas and reducing flexibility for emerging forms of industrial and technology-related infrastructure.
Correspondence Chain 4
542
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 2 • Data centers increasingly are treated by Bay Area jurisdictions as a form of modern industrial infrastructure that should coexist with other industrial and R&D uses, subject to appropriate standards. Many IP-zoned areas in Hayward already are characterized by industrial activity, substantial separation from sensitive receptors, and proximity to existing electrical infrastructure, making IP districts suitable locations for data centers. • Existing electrical infrastructure necessary to support data center development is located predominantly within the City’s IP-zoned areas, whereas IG-zoned areas largely lack necessary electrical infrastructure. As a result, the Proposed Industrial Amendments could result in a de facto prohibition of data centers in the City. • Concerns related to operational characteristics, compatibility with nearby uses, and public engagement could be addressed through targeted performance standards, discretionary site plan review, and required environmental review under the California Environmental Quality Act (“CEQA”), rather than through a categorical prohibition within existing industrial areas. Many Bay Area cities have taken this approach. • In addition to local land use approvals, data center facilities are subject to multiple layers of state and regional regulatory oversight and permitting processes that impose strict limits on emissions, noise, and environmental impacts.
• From a fiscal and infrastructure perspective, data centers provide net benefits to local jurisdictions, including property tax revenue, utility users tax revenue, and privately funded upgrades to power and grid infrastructure that provide improved grid reliability at no cost to residents.
For these reasons, we respectfully encourage the Planning Commission to consider revisions to the Proposed Amendments that would: (a) continue to allow data centers in both IP and IG districts, (b) provide clear and objective performance standards to address compatibility, environmental, and design considerations, and (c) require discretionary Major Site Plan Review or conditional approval only when performance standards cannot be met.
Finally, we appreciate the City’s intent to continue stakeholder engagement and welcome the opportunity for additional outreach and dialogue, particularly given that the data center provisions were not included in earlier drafts of the Business-Friendly Hayward amendments.
Additional engagement will help ensure that any final zoning changes are well-calibrated to Hayward’s economic development goals while also addressing community concerns.
Thank you for your time and consideration. We look forward to continuing collaboration with City staff, the Planning Commission, and the City Council as this process moves forward.
Respectfully,
Prologis
Enclosure: Prologis Comments on Proposed Industrial Amendments 543
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 3 Comments on Proposed Industrial Amendments
A. The Proposed Industrial Amendments Will Impede the Objectives of the Business- Friendly Hayward Project
The City’s website describes the Business-Friendly Hayward Project as “a strategic initiative designed to make it easier for businesses to locate and thrive in the City’s commercial and mixed-use areas, while also working to revitalize vacant and underused properties” with an aim of creating “a supportive environment for local businesses, attract[ing] new investment, and strengthen[ing] the local economy.”1 While many of the Proposed Amendments are thoughtfully designed to advance these objectives, the Proposed Industrial Amendments may not fully support the City’s strategic goals and instead appear to go beyond what is necessary to address legitimate concerns regarding data centers. As detailed below, there are more targeted, less burdensome approaches that could address these concerns effectively while continuing to encourage economic development and investment, along with fiscal stability, in Hayward.
As explained in the Planning Commission Staff Report for the January 22, 2026, meeting (“Staff Report”), under the City’s current Zoning Code, the City has treated data centers as an “office” use that is principally permitted in many commercial and industrial zoning districts, subject to Site Plan Review2 (structures greater than 5,000 sf), Major Site Plan Review3 (projects of 10 acres or more), and compliance with the City’s Industrial Design Guidelines. The Staff Report identifies three primary concerns with data center development: “operational characteristics,” “potential for impacts to sensitive receptors,” and a desire for public hearings to be required for any data center project. (Staff Report, pp. 7-8.) The staff recommendation is to (1) create a new definition of “data center”; (2) prohibit data centers in all zones except the IG zoning district; and (3) require a conditional use permit (“CUP”) with the associated public hearing process for all data centers.
Notably, the proposal to limit data centers to the IG district fails to account for the location of electrical infrastructure necessary to support data center development. Most existing PG&E infrastructure is located south of Highway 92, in the IP district. PG&E staff has informed Prologis that PG&E currently does not have sufficient electrical infrastructure in the IG zoned area to support data centers in the near term. By restricting data centers to the IG district, the City will undermine its own economic development objectives.
Prologis supports the City’s effort to clarify how data centers will be treated in the Zoning Code; however, we do not support prohibition of data centers in the IP zoning district.
Instead, many of the City’s concerns regarding the appropriate location and development standards for data centers can be addressed through performance standards and the environmental review process, as discussed below.
1 https://www.hayward-ca.gov/your-government/departments/planning-division/business-friendly-hayward-project 2 Hayward Municipal Code (“HMC”), § 10-1.1605(A).
3 HMC, § 10-1.1605(B).
544
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 4 B. Economic and Community Benefits of Data Center Development The rapid growth of cloud computing, artificial intelligence, and other data-driven industries has made data centers essential to modern economic vitality, particularly in the Bay Area, where global technology innovation is developed and scaled. As a centrally located Bay Area city, Hayward plays an important role in this innovative ecosystem. Prohibiting data centers in the IP zone would limit Hayward’s opportunity to participate in securing locally based digital infrastructure needed to support emerging technologies and remain competitive.
Data centers also create a wide range of jobs, from construction and skilled trades to long-term operations and specialized information technology roles. Across California, the industry has attracted significant investment and driven economic growth by supporting related sectors such as construction, telecommunications, power infrastructure, and advanced manufacturing.
Direct Fiscal Benefits
• City Tax Revenues: Construction and operation of a single medium-scale data center in Hayward could produce between $3 – 5.5 million in annual tax revenue for the City.
These revenues would support not only the City, but also the Hayward Unified School District and the Hayward Recreation and Park District. Because data centers house so much equipment that is refreshed frequently, they also generate a significant amount of tax revenue from the sales and use tax on the purchase of new data center equipment that is refreshed on a five-year schedule.
• Utility Users Tax (“UUT”): The City’s UTT imposes a 5.5 percent tax on utilities such as electricity and gas.4 The UUT represents the City’s third-largest revenue source and a major component of the City’s public safety funding. The City’s 2025-26 budget projects that revenues from the UUT will account for $27 million, representing 12.5 percent of the City’s total annual revenue. A single 99-MW data center would pay a UTT of approximately $5.7 million a year, reflecting over a 20 percent increase in the City’s existing annual total UTT revenue from a single project. • Impact Fees: New development of a data center would be subject to the City’s impact fees (e.g. traffic and park impact fees).5
Indirect Economic Benefits
• Grid Infrastructure Improvements: Many of the concerns often expressed about the impact of data centers on power availability and pricing are inapplicable to most Bay Area data centers. PG&E increasingly is shifting responsibility to fund electrical infrastructure to data center developers and operators with upfront payments and updated tariffs to ensure that PG&E residential and business customers do not become responsible for the cost to expand the electrical infrastructure. To accommodate anticipated data center and other demand growth in the Bay Area, including Hayward, it is anticipated that PG&E would expand and modernize its transmission infrastructure, further supporting regional power reliability and affordability. Anticipated data center projects would help 4 https://www.hayward-ca.gov/your-government/programs/utility-users-tax-uut 5 https://www.hayward-ca.gov/sites/default/files/pdf/Adopted-FY-2026-Master-Fee-Schedule-10-14.pdf 545
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 5 fund electrical grid resiliency and expandable electrical infrastructure to better accommodate electrical load growth in the City and the broader Bay Area. In fact, PG&E estimates average household rates could be reduced as data center load comes online.6 • Construction & Operational Jobs: In the year of peak construction, the total number of supported jobs for a medium-scale data center could surpass 400. Once construction is completed, total jobs supported by a medium-scale data center would remain stable at approximately 105. The average annual pay and benefits for these jobs is about $193,000 per year, which is almost twice the average annual pay and benefits for private jobs in Alameda County ($96,590).
• Support for Existing Industrial Facilities: Data center development supports significant investment in infrastructure upgrades, which brings additional power capacity to existing industrial markets. This development could spur additional manufacturing, R&D, and logistics activity in the City.
• Supporting Local Universities: Higher education institutions will need to integrate advanced technologies to meet the changing needs of their students and faculty and to support research across a variety of scientific, medical, and technological disciplines.
This technological need, in turn, will require universities and colleges to secure availability of data center infrastructure.
The Proposed Industrial Amendments, if adopted, will put Hayward at an economic disadvantage by directing data center development—as well as R&D and advanced manufacturing facilities (which increasingly rely upon geographically proximate data centers)—to other jurisdictions in the Bay Area, along with the associated tax revenues, jobs, and other community benefits.
Nearby cities (San Jose, Santa Clara, Milpitas, Fremont, Pittsburg) are accommodating data center development through the use of performance standards. Hayward risks diverging from the Bay Area industrial market if it adopts the restrictive approach outlined in the Proposed Industrial Amendments.
C. Existing Regulatory Standards Addressing Environmental Impacts of Data Center Development
Many concerns often expressed regarding impacts of data centers are overstated when applied to small and mid-sized data center development in the context of California’s existing regulatory and infrastructure environment. In addition to requiring local land use permits, most data centers with over 50 MW of emergency backup power generation require California Energy Commission (“CEC”) approval of the generators. The CEC has exclusive jurisdiction over “thermal power plants” (including diesel and natural gas generators) over 50 MW. Projects between 50 and 100 MW are authorized through the CEC’s Small Power Plant Exemption (“SPPE”) process. The CEC can grant an SPPE only if it finds that the proposed facility will not create a substantial adverse impact on the environment or energy resources, as demonstrated by a CEQA document prepared by the CEC. If the SPPE is approved, the project developer still must secure any other local, state, and federal permits required to construct and operate the project.
6 https://www.pge.com/en/newsroom/currents/future-of-energy/how-data-centers-like-amazon-s-can-lower- electricity-bills.html
546
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 6 The CEC routinely incorporates mitigation measures into its CEQA document ensuring that all impacts are less than significant. Using these measures, for the 15 data centers it has evaluated since 2019, the CEC has been able to make the finding that the data center project will not result in significant environmental impacts (including those to sensitive receptors). • Sensitive Receptors:
o Zoning & Design Standards: As discussed above, placement of data centers within existing industrial areas significantly addresses concerns regarding proximity of such uses to residential and other sensitive receptors. Many concerns pertaining to proximity of sensitive receptors can be addressed through engineering and design standards pertaining to building mass, orientation, mechanical screening, and location of loading and service areas.
o Air Quality/GHG: Data centers require emergency back-up generators to ensure consistent power supply during a power outage, disruption, or instability in the electric grid. Many types of facilities require back-up generators, including hospitals, schools and universities, water treatment plants, R&D facilities, distribution centers, and grocery stores (e.g., food refrigeration). The Bay Area Air District’s (“Air District’s”) Authority to Construct and the California Air Resources Board’s (“CARB’s”) Airborne Toxic Control Measures (“ATCM”) limit each engine to no more than 50 hours annually for reliability purposes (i.e., testing and maintenance). In California, data centers use Tier IV generators (e.g., best available control technology that reduces emissions), and either use 100 percent renewable electricity or participate in a program that reduces greenhouse gas (“GHG”) emissions to net zero. This requirement results in development of new renewable energy projects that will serve all users in California. o Noise: The City’s General Plan provides exterior noise limits based on land use categories. Industrial manufacturing and utilities, for example, are limited to a maximum level of exterior noise of 75 CNEL.7 Hayward Municipal Code Chapter 4, Sections 4-1.03.1, and 4-1.03.4, sets forth noise regulations applicable to commercial and industrial properties and limits operational noise levels at any point outside of the commercial and industrial property plane to 70 dBA Leq (HMC, § Section 4-1.03.1(b)). Through the use of standard engineering and design methods (described above), data centers can meet the above noise standards.
• Water Use: Criticisms of data center water usage for cooling equipment often are based on outdated or inaccurate information. Solutions such as air cooling closed-loop water systems do not require daily water consumption.
o A potential design approach for data centers is the use of an air-cooling system that does not require a continuous draw of water. Instead, it operates on a closed- loop system that is filled once during setup. Virtually no water is evaporated or discharged, thus there is no need to continuously feed the cooling system with 7 CNEL refers to Community Noise Equivalent Level measurements, a weighted average of sound levels gathered throughout a 24-hour period.
547
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 7 water. We are confident that this system can be adapted to meet the needs of all customer types.
o Hybrid cooling would be the exception rather than the rule and would only be pursued at the customer’s request. In such cases, the system can use recycled water where available. Preliminary analysis indicates that a hybrid design would require water consumption equivalent to the annual usage of fewer than 200 households, or approximately one large apartment building. o For a 99MW data center with a closed-loop cooling system, projected annual water use is 1-2 AFY . For comparison, a dwelling consumes approximately 0.3 to
0.5 AF of water per year. Therefore 500 dwelling units (the trigger for preparation of a Water Supply Assessment) would consume approximately 150 to 250 AFY of potable water.8
o For context, during the 2021/2022 fiscal year, the San Francisco Public Utilities Commission supplied the City with approximately 15,736 AF of potable water.9 • Trips: Data centers produce very few vehicle and truck trips compared to other industrial uses, reducing noise, roadway utilization, and air quality impacts to residents along roadways used to access industrial properties.
D. Proposed Zoning Code Solutions to Address Data Center Development The Proposed Industrial Amendments, if adopted, would prohibit development of data centers within the IP district despite the appropriateness of this district for data center uses based on the presence of existing industrial uses and electrical infrastructure, adjacent Light Industrial buffer areas, and geographic isolation from zones with higher concentrations of sensitive receptors. We recognize the City’s interest in ensuring appropriate public oversight and compatibility for data center development. Allowing data centers in IP zoning districts subject to clear, objective performance standards and discretionary site plan review, would provide the City with greater predictability, enforceability, and public transparency than a categorical zoning prohibition, while still advancing the Business-Friendly Hayward Project’s economic objectives.
1. Data Centers Should Remain Permitted in the IP, Industrial Park District.
The Proposed Industrial Amendments would prohibit data centers in all zones except IG zones, thereby eliminating the use on IP zoned properties. As explained below, data centers should be permitted in both IG and IP zoning districts.
IP zoned properties are located in three primary areas of the City: (1) along the north- westernmost portion of the City bordering the Bay, (2) either side of CA-92’s approach to the Hayward-San Mateo Bridge, and (3) a triangular area within the southernmost portion of the City 8 Department of Water Resources (DWR). Guidebook for Implementation of Senate Bill 610 and Senate Bill 221 of 2001. California Department of Water Resources. October 8, 2003. Accessed on: May 7, 2020. Accessed online at:
https://water.ca.gov/LegacyFiles/pubs/use/sb_610_sb_221_guidebook/guideboo k.pdf 9 Bay Area Water Supply & Conservation Agency (BAWSCA). Annual Survey, Fiscal Year 2021-22, BAWSCA.
March 2023. Accessed on: March 13, 2024. Accessed online at:
https://bawsca.org/uploads/userfiles/files/Annual%20Survey_FY21- 22_FINALv2.pdf 548
Pier 1, Bay 1, S an Francisco, C alifornia 94 111 Un ited Stat es Mai n +1 41 5. 394 .90 0 0 w w w.prologis.com 8 bordered by Industrial Parkway to the west, railroad tracks (BART and freight) to the east, and Whipple Road to the south.
We have not identified any IP-zoned parcel in the City that is directly adjacent to residential-zoned property. IP zones either share the same geographic characteristics as IG zones, or in some respects are farther away from residential, commercial, and mixed-use zones. Even in the southeast portion of the City, where existing residential development borders the eastern side of the railroad tracks, associated right-of-way, and BART maintenance facility, and existing industrial development borders the west side of the tracks, there is a buffer of approximately 600 to over 1000 feet of separation between the two zones.
The City’s IP zone “is intended to provide areas for high technology, research and development, and industrial activities” and allows a “variety of industrial, manufacturing, and high technology uses.” Given data centers often support or are collocated with each of these uses, prohibiting data centers within the IP zoning districts will have negative impact on all industrial uses and may disincentive investment in the City’s existing IP-zoned areas overall.
Other jurisdictions are not taking the same approach, particularly given the increasing need for data centers to be developed alongside industrial uses due to the increasing demand for AI and investment. At a minimum, we urge the Planning Commission to modify the proposed use table to identify data centers as either principally permitted, subject to Major Site Plan Review, or conditionally permitted in both IP and IG districts.
2. Performance Standards Would Effectively Address Data Center Concerns.
The Proposed Industrial Amendments propose requiring a CUP for all data centers, regardless of size or location, as a means of ensuring any data center project would be subject to a public hearing process. As a practical matter, many data center facilities will already trigger a public hearing under the existing Zoning Code based on acreage, because projects over 10 acres require Major Site Plan Review by the Planning Commission (subject to appeal to the City Council),10 and industrial parcels tend to be larger than parcels in other zoning districts.
As a discretionary approval, Major Site Plan Review would be subject to CEQA review, which would require identification and mitigation of any impacts associated with adverse environmental impacts.
Other Bay Area cities are instead utilizing performance standards for evaluating data center development. Adoption of specific performance standards would directly address the City’s concerns, with a CUP only being triggered for requests to waive or exceed such performance standards.
10 HMC, §§ 10-1.1605; 10-1.3075.
549
From: BC4AD
To: CityClerk; Elizabeth Blanton; Sachiko Riddle
Subject: Re: Planning Commission meeting - WS 26-002
Date: Thursday, January 22, 2026 9:41:22 PM
Attachments: 8E721ADA-56FE-40A2-9871-C8A67D045EAA.png
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
And finally,
Data centers are a danger to public health & safety because the FCC admitted it has no EMF studies concerning data centers nor any planned.
Correspondence Chain 5
550
551
On Thu, Jan 22, 2026 at 9:08 PM BC4AD < > wrote:
To follow up on a recent comment by a commissioner regarding Data centers, 552
This is what Larry Ellison said recently in a recent earnings call:
Are we seriously going to allow this in the City of Hayward moving forward? These data centers require massive amounts of energy.
553
The US needs to spend trillions on its grid and power capacity before it can afford to spend trillions on data centers.
- By 2028, a 44 GW power shortfall is projected
- That’s the equivalent of ~44 nuclear reactors
- Or ~70 gas power plants.
Residents cannot be subsidizing this massive buildout.
Best,
John
On Thu, Jan 22, 2026 at 8:57
PM BC4AD wrote:
Dear Planning Commission & staff,
I am not truly sure what we are trying to accomplish with the ACU. This seems to be a radical approach to patchwork the city again. Where are the aesthetic standards? The city is currently dilapidated & we are still not addressing the foundation. We need to implement comprehensive design standards. How will ACUs impact neighbors in residential areas? We as a coalition don’t want sudden increase in traffic in residential areas destroying our quiet peace & enjoyment. More traffic means more noise, more wear & tear on roads etc.
The only way to activate vacant commercial properties is to implement a vacancy tax. 554
With regards to data centers, I have previously written to the city council about the AI bubble. If the city is considering of approving more data centers, then they need to ask for the maximum community benefits such as facade improvement to finally address the blight. Residents should not be subsidizing data centers via strained water resources & electrical grid. Every time they unveil another mega-project, it’s the same story:
billionaires building empires, politicians chasing control, while we're told to pay for it & clap.
Why can France build at least aesthetically pleasing data centers? Yet we’re allowing ugly monstrosities.
A lawyer for Microsoft recently said: “nobody really wants a data center in their backyard, I don’t want a data center in my backyard, data centers don’t really bring a lot of jobs”. - Norton Rose Fulbright meeting.
Best,
John
BC4AD
555
From: Julie Machado MFT
To: Sachiko Riddle; Elizabeth Blanton
Cc: Mark Salinas; Frank Goulart
Subject: Re: Question about Rezoning Letter
Date: Friday, January 23, 2026 3:55:39 PM
Attachments: image.png
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Thank you, Sachiko!
I appreciate your prompt and clear response.
BTW, my very favorite cat ever, was named Sachiko ("Satchie" for short). She is no longer with us. I'll add a picture of her after my signature.
Warmly,
Julie Machado, LMFT
Lic. MFT 27937
22248 Main St.
Hayward CA 94541
(voicemail, no texts)
(regular email)
(secure email)
Pronouns: She/Her/Hers
Correspondence Chain 6
556
The information contained in this transmission is privileged and confidential and/or protected health information (PHI) and may be subject to protection under the law, including the Health Insurance Portability and Accountability Act of 1996, as amended (HIPAA).
This transmission is
intended for the sole use of the individual or entity to whom it is addressed. If you are not the intended recipient, you are notified that any use, dissemination, distribution, printing or copying of this transmission is strictly prohibited. If you have received this transmission in error, please contact the sender at (510) 581-7850 immediately and delete this email and any attachments from any computer.
From: Sachiko Riddle <[email protected]>
Sent: Friday, January 23, 2026 10:25 AM
To: Julie Machado MFT ; Elizabeth Blanton
<[email protected]>
Cc: Mark Salinas <[email protected]>; Frank Goulart Subject: RE: Question about Rezoning Letter
Hello,
Yes, your understanding of the new zoning is correct. The proposed CO-R district, which is what the RO district would become, allows for office uses by right. The legal status of your 557
use would not be impacted by this zoning change.
Please let us know if you have any other questions.
Thank you,
Sachiko
Sachiko Riddle (she/her)
Assistant Planner
Phone 510-583-4209| Email [email protected] 777 B Street, Hayward, CA 94544
Permit Center | E-Permits Portal | E-Permits Portal Help Center Please note:
City Hall will close non-essential services during the week of Monday December 22, through January 2, 2026. Inspections will not be scheduled during this time and will resume upon staff’s return to City Hall. Petitions, application submittals with required payment and resubmittals received by Wednesday, December 17 will be processed prior to the business closure; however, submittals/payments received between December 18 thru January 2, will be processed when offices reopen on Monday, January 5, 2026. Plans submitted prior to December 19, 2025, will be reviewed under the 2022 California Building Codes. Due to the City closure, plans submitted December 20, 2025, or later will be reviewed under the *NEW* 2025 California Building Codes.
From: Julie Machado MFT
Sent: Thursday, January 22, 2026 7:20 PM
To: Elizabeth Blanton <[email protected]>; Sachiko Riddle <[email protected]>
Cc: Mark Salinas <[email protected]>; Frank Goulart Subject: Re: Question about Rezoning Letter
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Adding a corrected email for Sachiko.
Julie
From: Julie Machado MFT
558
Sent: Thursday, January 22, 2026 7:18 PM
To: [email protected] <[email protected]>; sachiko.riddle@hayward <sachiko.riddle@hayward>
Cc: [email protected] <[email protected]>; Frank Goulart Subject: Question about Rezoning Letter
Hello,
We recieved your letter of January 15 regarding the proposed re-zoning of our property at 22248 Main Street.
Am I correct that the new zoning will still allow usage as professional office space, which is what the building has been used for, for approximately 30 years? I don't think it's relevant here, but I will also point out that this particular property is on the City's Historic Properties list, in case you are unaware of it.
I would prefer a response in writing via email. But if you feel you need to talk with me, my cell is .
Please advise.
Thank you,
Julie Machado, LMFT
Lic. MFT 27937
22248 Main St.
Hayward CA 94541
(voicemail only, no texts)
(regular email)
(secure email)
Pronouns: She/Her/Hers
The information contained in this transmission is privileged and confidential and/or protected health information (PHI) and may be subject to protection under the law, including the Health Insurance Portability and Accountability Act of 1996, as amended (HIPAA).
This transmission is
intended for the sole use of the individual or entity to whom it is addressed. If you are not the intended recipient, you are notified that any use, dissemination, distribution, printing or copying of this transmission is strictly prohibited. If you have received this transmission in error, 559
From: Miriam Lens
To: Sara Buizer; Jeremy Lochirco; Elizabeth Blanton; Sachiko Riddle Subject: FW: City Council Agenda Item No. 2: Work Session: Proposed Municipal Code and Zoning Map Revisions Related to the Business-Friendly Hayward Project
Date: Tuesday, January 27, 2026 8:35:35 AM
Attachments: Letter to Planning Commission_Agenda Item No.2 (1.22.2026).pdf FYI
From: Galvez, Janet
Sent: Monday, January 26, 2026 10:59 PM
To: List-Mayor-Council <[email protected]> Cc: Bell, Courtney ; Sidles, Philip ; Surdin-OLeary,
Danielle ; Harandi, Ali ; Tarpin, Claudia
; Thakral, Samidha ; Xu, Miao
Subject: City Council Agenda Item No. 2: Work Session: Proposed Municipal Code and Zoning Map Revisions Related to the Business-Friendly Hayward Project CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Dear Mayor and Councilmembers,
On behalf of Prologis, thank you for your continued leadership as the City considers updates to its zoning code and broader economic development strategy. For over 40 years, Prologis has invested in Hayward by supporting jobs, generating significant tax revenue, and advancing sustainable industrial development. We support the Business-Friendly Hayward initiative, particularly its focus on strengthening the City's fiscal health, attracting new investment while advancing sustainability and environmental stewardship in order to position Hayward for long-term resilience.
We write to share the letter Prologis submitted to the Planning Commission last week regarding proposed zoning changes affecting industrial and data center uses. We are concerned that the proposed prohibition of data centers in the Industrial Park zoning district will unintentionally work against the goals set forth in the Business-Friendly Hayward initiative. Given Council’s central role in shaping the City’s climate, economic, and land use policies, we wanted to ensure you had visibility into our perspective as this discussion continues.
At the outset, we want to emphasize that modern data centers can be planned and regulated in a manner consistent with Hayward’s sustainability and climate action goals.
Correspondence Chain 7
560
When subject to clear, objective performance standards, data centers can function as climate-supportive infrastructure that enables electrification, supports renewable energy integration, strengthens grid reliability, and reduces vehicle trips. In addition, locating data centers within established industrial areas, combined with enforceable performance standards, buffering, and CEQA review, provides a more precise and equitable approach than broad zoning exclusions, while ensuring that environmental and community impacts are appropriately addressed.
In addition to these sustainability benefits, data center uses represent a significant fiscal and economic opportunity for Hayward. For these reasons, we respectfully encourage the City Council to consider a balanced approach that continues to allow data centers in both IP and IG zoning districts, subject to clear, objective performance standards. Such an approach would advance Hayward’s economic development objectives while remaining aligned with the City’s sustainability priorities.
We welcome continued dialogue with City staff, Councilmembers, and stakeholders to ensure that any final zoning framework reflects Hayward’s leadership in climate responsibility while providing clarity to attract businesses and support economic stability.
Thank you for your time and consideration.
Janet Galvez | VP, Investment Officer
Pier 1, Bay 1 | San Francisco | California | 94111 | United States of America Direct | Mobile |
www.prologis.com | Follow us on LinkedIn and Twitter
The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer.
signature for Galvez, Janet
561
From: Alisha Khan
To: List-Planning Commission; ; ; ;
; ;
Cc: Jeremy Lochirco; Elizabeth Blanton; Sachiko Riddle
Subject: FW: ACU and empty buildings
Date: Friday, January 30, 2026 12:55:13 PM
Good afternoon, Planning Commissioners,
Please see the email below from Peggy Guernsey regarding ACUs and vacant commercial buildings. This comment relates to the Business Friendly Project and is being forwarded for your awareness.
Thank you,
Alisha Khan | Senior Secretary
Planning Division
P 510-583-4205 | [email protected]
-----Original Message-----
From: Peggy Guernsey
Sent: Friday, January 30, 2026 12:10 PM
To: Alisha Khan <[email protected]>
Subject: ACU and empty buildings
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Hi Alisha,
Please direct the Planning Commission to not pass ACU into residential zoning and housing areas.
We have hundreds of empty buildings where these vendors can start their businesses off the street, inside, with cleaning supplies and laws, electric, gas, table and chairs off sidewalks, and streets.
My street is horribly impacted by ADUs lack of parking for the 10+new cars.
We are a single family home street,
surrounded by apts, 2/3/4/5 plexus. Our homes are mostly 1 car short driveways,garages that the lack for parking is severely blocking Paratransit drop off of disabled residents. Paratransit must park in the middle of the street and we must walk down slope into the gutter to get home.
The apts, condos you are approving do NOT have shopping centers, many closed and moved out, to support these new residents, So they go to Union City, Fremont to shop.
Please stop ACU in Hayward until all our empty buildings are full!!!!!!!!!!!! Peggy Guernsey
25236 Delmar Ave
Hayward, CA 94542-1806
Correspondence Chain 8
562
From: Puesto Markets. INC
To: Leigha Schmidt; Elizabeth Blanton; Sachiko Riddle; ; List-Planning Commission; Jeremy Lochirco; Angela Andrews; Ray Bonilla; Daniel Goldstein; George Syrop; Francisco Zermeno; Julie Roche; Mark Salinas Subject: Request for Guidance and Reconsideration Regarding Municipal Code Section 10-1.110 Date: Monday, February 2, 2026 6:12:47 PM
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Good evening City Planning Division, Commissioners, City Council Members, and Mayor, My name is Lesley Urista, and I am the owner of Puesto Market, located at 226 Jackson St., Hayward, CA 94544. I am writing to respectfully follow up on our previous conversations regarding potential changes to Municipal Code Section 10-1.110.
As discussed, my application for a Conditional Use Permit (UP-25-0020) to sell beer and wine was denied due to the presence of a liquor store located across the street. I understand the reasoning behind this decision; however, I strongly believe that liquor stores should not be categorized under the same municipal code as full-service grocery stores.
These are fundamentally different business models, serving different community needs.
Had these uses been distinguished separately, I believe my application could have been considered more favorably.
I have spoken directly with the liquor store owner, and we are in full agreement that our businesses are not the same. They are also supportive of my continued efforts to advocate for this distinction.
Additionally, with the recent closure of Walgreens and the upcoming closure of Safeway in our area, the community is losing essential grocery access. Given these changes, I would like to ask whether my application could be reconsidered. I would also like to note that the business located next door at 230 Jackson St., Hayward, CA 94544 has been leased to a Latin pharmacy with no rights to sell alcohol, and any previously associated liquor license will not be utilized at that location.
At this time, I am seeking guidance on what steps I can take next. I understand the basis for the original denial, but I believe it is appropriate to reevaluate this policy especially during a time when many local businesses are struggling to remain open and the population has grown significantly since the last amendment to this municipal code.
As a small business owner, I am doing everything I can to keep my doors open. In this type of business, any additional revenue makes a meaningful difference. I sincerely appreciate your time, consideration, and any guidance you can provide as I continue to pursue this matter.
Correspondence Chain 9
563
Thank you for your attention.
Sincerely,
Lesley Urista
Owner, Puesto Market
226 Jackson St.
Hayward, CA 94544
564
From: Sachiko Riddle
To: Ben Goulart; Elizabeth Blanton
Cc:
Subject: RE: rezoning our neighborhood?
Date: Monday, February 9, 2026 8:16:56 AM
Attachments: image001.png
image002.png
Hello,
No, the existing businesses will not be impacted by this change. Their business license is still valid and they will be able to continue operating. They will renew as normal at the end of 2026 with no changes to their status.
Thank you,
Sachiko
Sachiko Riddle (she/her)
Assistant Planner
Phone 510-583-4209| Email [email protected] 777 B Street, Hayward, CA 94544
Permit Center | E-Permits Portal | E-Permits Portal Help Center Please note: City Hall will close non-essential services during the week of Monday December 22, through January 2, 2026. Inspections will not be scheduled during this time and will resume upon staff’s return to City Hall. Petitions, application submittals with required payment and resubmittals received by Wednesday, December 17 will be processed prior to the business closure; however, submittals/payments received between December 18 thru January 2, will be processed when offices reopen on Monday, January 5, 2026. Plans submitted prior to December 19, 2025, will be reviewed under the 2022 California Building Codes. Due to the City closure, plans submitted December 20, 2025, or later will be reviewed under the *NEW* 2025 California Building Codes.
From: Ben Goulart < >
Sent: Saturday, February 7, 2026 9:08 AM
To: Elizabeth Blanton <[email protected]> Cc: Sachiko Riddle <[email protected]>
Subject: Re: rezoning our neighborhood?
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Correspondence Chain 10
565
Thank you for all the information, the clarity was helpful. It seems Google has a completely different
description
of
what
Hayward's
"Commercial/
Office
Residential"
will
look
like,
and
I
am
glad
the
city
is
not
implementing
any
of
that.
One
question
I
have
is
whether
existing
businesses
operating
as
a
"normal"
business,
like
a
landscape
contractor,
dentist
or
counseling
office,
need
to
upgrade
to
"commercial"
status?
Or
is
it
business
as
usual
with
the
change?
Thanks,
On
Fri,
Feb
6,
2026
at
3:09 PM
Elizabeth
Blanton
<[email protected]>
wrote:
Hi Ben,
It
was
nice
chatting
with
you
just
now.
Thanks
again
for
reaching
out
about
the
proposed
rezoning
of
your
property
and
immediate
neighborhood
from
“Residential
Office”
to
“Commercial
Office-Residential”
as
part
of
the
Business
Friendly
Hayward
Project.
As
we
discussed,
the
proposed
rezoning
is
an
effort
to
consolidate
two
of
the
City’s
zoning
districts
that
are
very
similar
to
each
other
–
the
“Residential
Office”
District
and
the
“Commercial
Office”
District.
Both
districts
allow
a
mix
of
office
and
residential
uses,
and
so
will
the
newly
proposed
district,
as
is
shown
in
the
attached
chart,
which
was
included
in
the
mailer
sent
to
all
affected
properties.
No
other
types
of
commercial
businesses,
like
retail
stores,
restaurants,
or
auto
service
uses
will
be
allowed
as
part
of
these
changes.
Additionally,
there
are
no
changes
to
the
allowed
density
or
intensity
of
development,
meaning
that
future
development
will
still
be
subject
to
the
same
development
rules
for
dwelling
units
per
acre,
building
heights,
front
and
side
setbacks,
and
parking
standards
that
are
in
place
today.
As
a
result,
the
future
character
of
the
neighborhood
will
remain
the
same.
I
hope
you’ll
join
us
for
our
virtual
meeting
to
discuss
the
proposed
rezonings
on
Thursday,
February 12 at 10:00 a.m.
You
can
join
the
meeting
using
this
link:
https://bit.ly/3NmPLHo.
(Since
I
have
your
now,
I’ll
also
forward
you
a
calendar
invitation,
which
you
can
re-
forward
as
you
see
fit.)
Additionally,
if
your
neighborhood
group
meets
regularly
and
would
like
my
project
co-lead,
Sachiko
Riddle,
and
I
to
attend
a
future
meeting
of
yours
to
discuss
this
project
further,
we’d
be
happy
to
–
just
let
us
know
when.
Thanks
and
have
a
good
weekend,
566
Elizabeth
Elizabeth Blanton (she/her)
Senior Planner
Phone 510-583-4206 | Email [email protected] 777 B Street, Hayward, CA 94544
Permit Center | E-Permits Portal | E-Permits Portal Help Center ----------
On Thu, Feb 5, 2026 at 3:31
PM, Ben Goulart <[email protected]> wrote:
CAUTION:This is an external email. Do not click on links or open attachments 567
unless you know the content is safe.
** Please note I was the past president of the Prospect Hill Neighborhood Association, not the current president of the North Main Prospect Neighborhood Association.** My bad, and sorry for the confusion, I should have done my due diligence. I am triggered by this rezoning plan because past rezoning of west Hayward years ago ushered in the crazy powerplant. I will be meeting with the NMPHA to talk shop about moving forward, as nobody knows that we are getting commercial office zoning that will crush the residential feel of our community.
Ben Goulart
Past President, Prospect Hill Neighborhood Association
On Thu, Feb 5, 2026 at 12:47
PM Ben Goulart < > wrote:
Hi George, I live at 22244 Main Street, and have lived in this neighborhood for 35 years. As the president of the Prospect Hill Neighborhood Association, we are all unhappy with the city's new plans to rezone our neighborhood. I see that zoning changes will bring significant changes to our neighborhood. What I saw is that you are changing our residential neighborhood from "office/residential" to "commercial office/residential" and this is what google says could be the fall out from doing that:
Rezoning a neighborhood from "office/residential" to "commercial office/residential" significantly increases development potential, likely leading to
higher traffic volume, increased noise, light pollution, and more intense, higher-density construction. While this change may increase property values, it can also decrease privacy and quiet enjoyment, as commercial uses like retail or service businesses are introduced alongside homes.
Significant changes to expect include:
Increased Traffic and Noise: The introduction of commercial businesses often brings higher volumes of traffic, including customers, delivery trucks, and, potentially, increased noise pollution.
Greater Density and Height: The new designation may permit taller or larger buildings, potentially altering the neighborhood's aesthetic and reducing privacy for existing homes.
Shift in Commercial Character: The area may see a mix of retail, services, 568
or office spaces, making it more of a mixed-use or "walkable" corridor, which can be positive for convenience but less peaceful for residents.
Higher Property Values (and Taxes): Commercial-zoned land is generally more valuable than purely residential land, which can lead to higher property assessments and increased property taxes for homeowners.
Infrastructure Changes: Increased density might necessitate improvements to utilities (water, sewer) to accommodate larger commercial, as opposed to residential, demands.
Overall, this rezoning moves a neighborhood from a blend of work-live to a more intense, mixed-use commercial environment, which can bring both economic benefits and disruptions to daily life.
*We are not happy about this and formally request a denial of zoning changes.
Please contact me asap so we can talk about this project as we are looking into hiring a lawyer to take up this case if this action is pursued.
Ben
Goulart
President, Prospect Hill Neighborhood Association
--
Benjamin Goulart
The Waterfall Guy
569
2/13/2026
City of Hayward
Department of Planning and Development
777 B Street
Hayward, CA 94541
Attention: Elizabeth Blanton, Senior Planner: [email protected] Sachiko Riddle, Associate Planner: [email protected] Re: Supply Chain Federation Comments on “Business-Friendly Hayward” Zoning Update
Elizabeth Blanton and Sachiko Riddle,
On behalf of the Supply Chain Federation (SCF) and California Trucking Association (CTA), we appreciate the opportunity to provide comments on the City of Hayward’s proposed zoning updates under the “Business-Friendly Hayward” initiative. We support the City’s goal of modernizing zoning regulations and strengthening economic development.
However, several proposed changes to industrial use definitions and permitting requirements raise concerns regarding unintended impacts on investment certainty, leasing flexibility, and Hayward’s overall competitiveness.
The Supply Chain Federation is a national trade association representing companies involved in goods movement, logistics, distribution, industrial real estate, and related infrastructure across the United States. Our membership includes Third-Party Logistics (3PL) providers, warehouse operators, last-mile delivery companies, developers, ports, and transportation providers that collectively support local and regional economies through job creation, tax revenue, and efficient movement of goods. We engage regularly with state and local governments on land-use, infrastructure, and regulatory policies that directly affect supply chain operations and industrial competitiveness.
The California Trucking Association is the nation’s largest statewide trade association representing the trucking industry. Established in 1934, CTA supports the companies and professionals that keep California’s economy moving. Our carrier membership ranges from individual owner-operators to small family-owned for-hire fleets, to the world's largest international carriers. A vital and indispensable component of the state’s economic health, nearly 80 percent of California communities rely exclusively on trucks for essential goods, and the industry hauls 90 percent of all manufactured tonnage statewide.
Correspondence Chain 11
570
Truck Terminal Definition and Treatment of Last Mile and 3PL Uses The proposal to expand the definition of “Truck Terminal” to include Last Mile delivery and Third-Party Logistics (3PL) operations represents a significant policy shift. As proposed, these uses would no longer be permitted in the Industrial Park (IP) zoning district and would also require a Conditional Use Permit (CUP) in the General Industrial (IG) district.
Last Mile and 3PL operations are integral components of modern supply chains and operate across a wide range of building types and scales. Treating these business models as a distinct land-use category—rather than addressing operational intensity through objective performance standards—risks over-regulating lower-intensity facilities and materially limiting future leasing flexibility for both logistics providers and property owners.
This approach could discourage investment and reduce the adaptability of industrial properties to evolving market needs.
We encourage the City to distinguish between land-use classification and operational intensity. Many potential impacts associated with logistics activity—such as truck frequency or hours of operation—can be more effectively addressed through clear, objective standards rather than reclassification into more restrictive use categories.
Data Centers
We are also concerned with the proposal to remove data centers as a permitted use in the IP zoning district and would also require a CUP in the IG district. IP-zoned sites are often uniquely suited for data center development due to existing power infrastructure and site characteristics. Eliminating the data center use could negatively affect IP-zoned land values and weaken Hayward’s ability to compete for technology-related investment.
Data centers represent significant long-term capital investment and contribute to local employment and the tax base. Eliminating data centers as an allowable use, or requiring discretionary approvals may lengthen project timelines, increase entitlement risk, and complicate financing, making Hayward less competitive relative to neighboring jurisdictions that continue to allow these uses by right in comparable zones.
Legal Non-Conforming Uses and Business Impacts
By eliminating the Last Mile and 3PL use in the IP zoned area, any existing business that plans to relocate or expand within the City of Hayward would be prevented from doing so.
This could lead to businesses leaving the City of Hayward, increased building vacancy, and the reduction in property values due to the limited pool of businesses that are allowed in operate in these areas of the City.
Investment Certainty and Conditional Use Permits
Across both proposals, the increased reliance on Conditional Use Permits introduces 571
additional time, cost, and political uncertainty into the development and leasing process.
For property owners, tenants, and lenders, entitlement risk is a material consideration that directly affects feasibility and investment decisions—particularly for speculative development or adaptive reuse of existing industrial buildings.
Regional Competitiveness and Policy Alignment
Hayward operates within a highly competitive regional industrial real estate market. Even modest increases in regulatory uncertainty can shift investment to nearby jurisdictions that offer clearer and more predictable zoning frameworks. Restrictive policies do not eliminate demand for logistics or technology uses; rather, they risk displacing that activity—and associated economic benefits—elsewhere.
We also encourage the City to evaluate whether the proposed changes are fully aligned with adopted General Plan goals related to industrial land preservation, job growth, and economic competitiveness.
Conclusion
While we appreciate the City’s effort to modernize its zoning framework, we respectfully urge reconsideration of the proposed treatment of Last Mile, 3PL, and data center uses.
Retaining by-right status for these uses in appropriate industrial districts—or addressing concerns through objective, performance-based standards—would better support the City’s stated business-friendly objectives while preserving predictability and flexibility for industrial stakeholders.
Thank you for your consideration and welcome the opportunity to meet with you to discuss our concerns. If you have any questions, please contact Sarah Wiltfong at Sincerely,
Sarah Wiltfong
Chief Advocacy & Policy Officer
Supply Chain Federation
Nick Chiappe
Director of Government and Regulatory Affairs
California Trucking Association
CC: Mayor Salinas and City Council Members
572
575 Market Street, Suite 400 | San Francisco, CA 94105 P: | | www.naiopsfba.org
February 17, 2026
The Honorable Mark Salinas
Mayor, City of Hayward
Members of the City Council
City of Hayward
777 B Street
Hayward, CA 94541
Dear Mayor Salinas and Members of the City Council:
On behalf of the NAIOP San Francisco Bay Area Chapter, the Commercial Real Estate Development Association representing over 750 developers, owners, investors, and service providers throughout the region, I am writing to share concerns regarding proposed amendments to the City’s industrial zoning regulations as part of the Business-Friendly Hayward initiative.
We appreciate and support the City’s stated goal of strengthening economic development and improving regulatory clarity. However, several of the proposed changes affecting industrial districts may unintentionally introduce new limitations that appear inconsistent with those objectives.
The draft revisions would broaden the definition of “Truck Terminal” to include Last Mile and Third-Party Logistics (3PL) operations and remove these uses as permitted-by-right in the IP zoning district, instead requiring a Conditional Use Permit in the IG district. Last Mile and 3PL facilities are now essential components of modern supply chains and are commonly accommodated in industrial zones throughout the Bay Area. Subjecting these uses to discretionary approval would reduce flexibility for existing and future industrial properties, introduce uncertainty into leasing decisions, and make it more difficult for owners and tenants to respond to evolving logistics demands.
The proposed treatment of data centers raises similar concerns. The draft update would remove data centers as a by-right use in the IP district and instead require a Conditional Use Permit in the IG district. Many IP-zoned properties are well suited for data center development due to their location, building configuration, and access to power infrastructure. Requiring discretionary approval where none is currently required may negatively affect land values, complicate site selection decisions, and reduce Hayward’s competitiveness relative to neighboring jurisdictions actively seeking to attract advanced industrial and technology uses.
We understand that these concepts were initially presented without direct outreach to industrial property owners or operators. We appreciate staff’s subsequent willingness to convene a virtual stakeholder session and view that as a constructive opportunity for meaningful engagement with the commercial real estate community.
Correspondence Chain 12
573
575 Market Street, Suite 400 | San Francisco, CA 94105 P: | | www.naiopsfba.org
Industrial land remains a cornerstone of Hayward’s economic base and a critical component of the region’s goods movement and employment ecosystem. As the City finalizes its zoning updates, we respectfully urge a balanced approach that preserves predictability within industrial districts while advancing broader economic development goals.
Thank you for your consideration and for your continued commitment to Hayward’s long-term economic vitality.
Sincerely,
Al
ison Trejo, CAE
Executive Director, NAIOP San Francisco Bay Area Chapter 574
From: Richard Poolis
To: Elizabeth Blanton
Subject: Truck Terminal Feedback
Date: Thursday, February 19, 2026 11:33:24 AM
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Hi Elizabeth,
First of all thanks for hosting the industrial round table today to solicit feedback on the industrial use definitions. The City of Hayward has always been really good at making their zoning rules clear to owners/developers especially compared to other 880 Cities. So I commend the City for that.
I was able to provide some verbal response but wanted to document and send in writing my thoughts around the Truck Terminal definition.
- Concern is some ‘industrial labels’ like 3pl and last mile delivery included in the Truck Terminal definition
- 3pl / last mile delivery is a business model not a land use o Many 3PL operators
§ Store goods long term
§ Use racking
§ Fulfill orders
§ Function as traditional warehouses
- As written - the inclusion of 3PL in the truck terminal definition may unintentionally capture traditional warehouse users whose primary activity is storage and distribution rather than freight movement (which is what I think the City is trying to carve out) -
Incidental storage needs clarification
o ‘storage of cargo is incidental to the primary function of…” § Maybe look to define incidental
· By time
· By floor area
· By revenue
· Bu operational intent
- Dock door threshold not enough on its own as drafted o Many legitimate warehouses have 10-40 doors but operate as storage and distribution facilities.
o Operational characteristics should control
- Redefine Truck Terminal by throughput metrics o I think the City is focused on traffic impacts so focus on defining this o Another focus point could be throughput volume
Thank you and happy to chat further or take part in any other focused conversations, Regards,
Richard
Correspondence Chain 13
575
Richard Poolis
Director of Development
Northern California, Seattle, Texas
First Industrial Realty Trust (NYSE:FR)
3620 Happy Valley Road, Suite 201
Lafayette, CA 94549
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd, an innovator in Software as a Service (SaaS) for business. Providing a safer and more useful place for your human generated data. Specializing in; Security, archiving and compliance. To find out more Click Here
.
576
From: Sidles, Philip
To: Elizabeth Blanton; Sachiko Riddle
Cc: Bell, Courtney; Surdin-OLeary, Danielle; Galvez, Janet Subject: RE: Business Friendly Hayward Project - Follow up from last week"s Industrial Businesses Focus Group Date: Tuesday, February 24, 2026 11:44:58 AM
Attachments: image001.png
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Good Morning Elizabeth and Sachiko,
Thank you again for hosting the Industrial outreach call. It was great to see such strong engagement - with roughly 70 participants, it’s clear there is a lot of interest in the City of Hayward and these proposed changes.
With the large group and all of us providing feedback, we didn’t get a clear picture of what the City is hoping to achieve with the proposed changes to the truck terminal definition. We want to make sure we have a clear grasp of your priorities and the specific impacts you’re trying to address so that we can be constructive partners in identifying workable solutions.
We’d like to schedule a smaller working session with your team to better understand your objectives and the policy direction you’re considering.
The Prologis team brings a unique perspective to this discussion, as we are both a developer and a long-term owner, and we develop across multiple product types — including traditional industrial and data centers. That vantage point allows us to think holistically about operational impacts, tenant demand, long-term land use strategy, and how definitions may influence real-world project feasibility over time. We believe that perspective could be helpful as you refine the proposal.
We are happy to share examples from around the Bay Area that may help address the concerns you’re targeting while also keeping the zoning framework attractive to investment.
In general, we encourage maintaining maximum use flexibility across the industrial zones. A flexible framework helps ensure that industrial areas can adapt to evolving business needs and changing market conditions over time. When allowable uses are narrowly defined, it can increase vacancy risk and slow reinvestment in existing properties. Over the long term, flexibility supports continued modernization of industrial buildings and infrastructure, helping the City sustain a strong employment base and economic resilience. Similarly, while Conditional Use Permits (CUPs) may be appropriate in certain cases, added uncertainty in process and timing can unintentionally discourage reinvestment.
Please let us know your availability over the next two weeks, and we will coordinate a time that works for everyone.
Correspondence Chain 14
577
Thanks again!
Phil
Philip Sidles | Director, Entitlements
Pier 1, Bay 1 | San Francisco | California | 94111 | United States of America Direct | Mobile |
www.prologis.com | Follow us on LinkedIn and Facebook
The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer. signature for Sidles, Philip
From: Elizabeth Blanton <[email protected]> Sent: Monday, February 23, 2026 2:54 PM
To: Elizabeth Blanton <[email protected]>; Sachiko Riddle <[email protected]>
Cc:
Subject: Business Friendly Hayward Project - Follow up from last week's Industrial Businesses Focus Group
*EXTERNAL EMAIL*
CAUTION: This email originated from outside of Prologis. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Hi all,
Thanks again for joining us at our Industrial Businesses Focus Group last week for the Business Friendly Hayward Project. As promised, for those of you who weren’t able to hang on the line with us to discuss the updates to our proposed data center regulations based on recent Council direction, we will be holding a second meeting to provide this update. If you’d like to participate, please indicate your availability in this Doodle poll by Wednesday at noon. For those who are interested, I’ll follow up with a calendar invitation and Microsoft Teams link based on the date/time that works for most people.
In addition, Sachiko and I will be workshopping the definitions of “truck terminal” and “last mile delivery” based on all of your feedback and will follow up when we have new proposed language to share. Thanks to those of you who have already provided suggested language. If you have 578
suggestions which you have not already shared, please send them our way.
Again, thanks for your engagement on this project. Let us know if you have any additional thoughts or questions.
Elizabeth
Elizabeth Blanton
Senior Planner
|
Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center 579
From: Sachiko Riddle
To: Greg Pearson; Elizabeth Blanton
Subject: RE: Business Friendly Hayward Project - Update on Truck Terminal/Last Mile Delivery Definitions Date: Monday, March 9, 2026 8:58:50 AM
Attachments: image001.png
Hello,
We are keeping our current definition of truck terminal which does not include 3PL in the description. I will forward you the meeting invite for tomorrow.
Thank you,
Sachiko
Sachiko Riddle (she/her)
Assistant Planner
Phone 510-583-4209| Email [email protected] 777 B Street, Hayward, CA 94544
Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Greg Pearson >
Sent: Friday, March 6, 2026 2:36 PM
To: Elizabeth Blanton <[email protected]>; Sachiko Riddle <[email protected]>
Subject: RE: Business Friendly Hayward Project - Update on Truck Terminal/Last Mile Delivery Definitions
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Thanks – I would love to be included in the call for the 10th.
To that end, is the 3PL bit also off the table?
GP
Greg Pearson
Fortress Investment Group
11611 San Vicente Blvd
10th Floor
Los Angeles, CA 90049
M: (US) / M: (UK)
Correspondence Chain 15
580
[email protected]
From:
Elizabeth Blanton <[email protected]>
Sent: Friday, March 6, 2026 2:32 PM
To: Elizabeth Blanton <[email protected]>; Sachiko Riddle <[email protected]>
Subject: Business Friendly Hayward Project - Update on Truck Terminal/Last Mile Delivery Definitions Hi all, Over the past couple of weeks, Sachiko and I have been working with internal staff and several of you to refine our draft definitions for “Truck Terminal” and “Last Mile Delivery. ” During this process, something has become clear – it’s
Hi all,
Over the past couple of weeks, Sachiko and I have been working with internal staff and several of you to refine our draft definitions for “Truck Terminal” and “Last Mile Delivery.” During this process, something has become clear – it’s going to take us more time to get this right.
As a result, we’ve made the decision to remove our revised definition for Truck Terminal from the Business Friendly Hayward Project [hayward-ca.gov]
that will be going forward to Planning
Commission and City Council for final approval next month. Instead, the existing definition, as well as our existing policies for processing these types of uses will remain in place, unchanged.
At the end of the day, the purpose of this project is to make our regulations clearer, and more business friendly. We’ve heard loud and clear from you all that our proposed revised definition is not achieving that objective, so it’s an easy decision to not move forward with the proposed language.
For those of you that would like to continue working with us on drafting new definitions, we will still hold our planned meeting next week on 3/10 at 10:30 a.m. We’ll use this time to continue taking input on what thresholds and terminology any new definitions should include if the City decides to move forward with revising these definitions in the future. If you have further input that you have not already shared with us, we encourage you to join us.
As always, don’t hesitate to reach out if you have any questions, Elizabeth
Elizabeth Blanton
Senior Planner
|
Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center [hayward-ca.gov] | E-Permits Portal [haywardca-energovpub.tylerhost.net] | E-Permits Portal Help Center [hayward-ca.gov]
The Fortress Compliance Department prohibits all Fortress personnel from communicating about Fortress related business over text message. Fortress employees are only permitted to communicate about Fortress business on Fortress email, Microsoft Teams, Bloomberg and, if pre-approved by the Fortress Compliance Department, WhatsApp.
581
From: Elizabeth Blanton
To: "Nathan Downs"
Cc: Naomi Powell; NoMa Prospect Neighborhood Association; Sachiko Riddle Subject: RE: The Real NoMa Prospect Neighborhood Assoc
Date: Thursday, March 19, 2026 10:38:00 AM
Attachments: image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image009.png
Thank you! We’ll forward along to our admin team along with your email addresses to make sure you are all noticed about projects in/near this boundary.
And thanks for the kind words – it was a pleasure meeting with you all last night. Your thoughtfulness and care for your neighborhood is inspiring.
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Nathan Downs < >
Sent: Thursday, March 19, 2026 7:00 AM
To: Elizabeth Blanton <[email protected]> Cc: Naomi Powell ; NoMa Prospect Neighborhood Association ; Sachiko Riddle <[email protected]>
Subject: Re: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Good morning. With all of the criticisms and frustrations around government these days it's refreshing to have open and collaborative experiences like last night. Thank You.
Here is our footprint:
Correspondence Chain 16
582
On Wed, Mar 11, 2026 at 3:12 PM Elizabeth Blanton <[email protected]> wrote:
Perfect – that will work great for the space. Thanks!
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Naomi Powell < >
Sent: Wednesday, March 11, 2026 1:59 PM
To: Elizabeth Blanton <[email protected]> Cc: Nathan Downs < >; NoMa Prospect Neighborhood Association >; Sachiko Riddle <[email protected]>
Subject: Re: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Hi Elizabeth,
We deeply appreciate the conference space at City Hall! We should have no more than 8 - 10 people.
Naomi
583
On Wed, Mar 11, 2026 at 11:49 AM Elizabeth Blanton <[email protected]> wrote:
Hi Naomi,
No problem – I reserved us Conference Room 1C in City Hall on Wednesday, March 18 at 7pm. When
members of your group arrive, let the Security Guard know that you have a meeting with Elizabeth Blanton and Sachiko Riddle in Conference Room 1C, and they will direct you to the correct place.
Do you have a sense of how many people we should be expecting? Thanks,
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Naomi Powell < >
Sent: Wednesday, March 11, 2026 11:06 AM
To: Elizabeth Blanton <[email protected]> Cc: Nathan Downs < >; NoMa Prospect Neighborhood Association < Sachiko Riddle <[email protected]>
Subject: Re: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Hello Elizabeth,
Thank you for the update and clarification to the proposed rezoning, we look forward to discussing in depth! Might a conference room be available at City Hall we could use? If not, let's plan to meet at Buffalo Bill's on B St.
All the best,
Naomi
On Wed, Mar 11, 2026 at 10:01 AM Elizabeth Blanton <[email protected]> wrote:
Hi Nathan,
See attached for a chart showing the two options that staff is considering for the Residential Office (RO) zoning district:
584
Option 1: RO zoning remains, but office uses are allowed by right, instead of having to go through a use permit process. Also, outdoor recreational uses would now be prohibited.
Option 2: The RO district is combined with the Commercial Office (CO) district to create a new district: Commercial Office – Residential (CO-R). This new district would mean that additional uses would be allowed by right in your neighborhood, including offices, personal services (hair and nail salons, for example), plant nurseries, and low-barrier navigation centers for the homeless.
Option 2 is what the City initially proposed, as seen in the mailers that were sent out in January.
However, given feedback that we’ve received to date, staff created Option 1, which wouldn’t result in a rezoning at all, but rather would make it easier to open an office. At this point, staff is leaning toward Option 1, but we are curious to learn your Neighborhood Association’s preferences/thoughts on the two choices, and to hear if you recommend any further revisions to either option.
Once you have a location determined for the dinner/meeting next week, let us know where we should meet you. Looking forward to our discussion. Thanks again for your engagement on this project.
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Nathan Downs <
Sent: Monday, February 23, 2026 4:10 PM
To: Elizabeth Blanton <[email protected]> Cc: NoMa Prospect Neighborhood Association < >; Naomi Powell >; Sachiko Riddle <[email protected]>
Subject: Re: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Sounds great, thanks for the update Liz!
On Mon, Feb 23, 2026 at 3:30 PM Elizabeth Blanton <[email protected]> wrote:
Hi Nathan,
We’re working on some revisions to the materials that we’ve already sent you based on some feedback received to date. We’ll make sure to send these to you at least a week before the March 18 meeting.
585
Thanks,
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Nathan Downs < >
Sent: Thursday, February 19, 2026 9:10 AM
To: Elizabeth Blanton <[email protected]> Cc: NoMa Prospect Neighborhood Association < ; Naomi Powell < >; Sachiko Riddle <[email protected]>
Subject: Re: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Excellent, we look forward to meeting you and Sachiko. Question: are there any materials we could share with the board and/or community in advance? If so this could help us hit the ground running and make the best use of our time. Thanks! On Thu, Feb 19, 2026 at 8:35 AM Elizabeth Blanton <[email protected]> wrote:
Hi Nathan,
Yes, Wednesday, March 18 at 7:00 p.m. works for us. Let us know the location when it’s selected.
Looking forward to meeting your group.
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Nathan Downs <
Sent: Wednesday, February 18, 2026 6:53 PM
To: Elizabeth Blanton <[email protected]> 586
Cc: NoMa Prospect Neighborhood Association ; Naomi Powell >; Sachiko Riddle <[email protected]>
Subject: Re: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Yes, it’s the third Wednesday of the month @7. Does next month work for you? On Tue, Feb 17, 2026 at 11:49 AM Elizabeth Blanton <[email protected]> wrote:
Hi Nathan,
Thanks for reaching out. Unfortunately, we can’t make this Wednesday work, but we’d love to meet with your group. Let us know if we can get on your calendar for your March meeting or perhaps if we can find a date to touch base in between.
Elizabeth
Elizabeth Blanton (she/her)
Senior Planner
Phone 510-583-4206 | Email [email protected] 777 B Street, Hayward, CA 94544
Permit Center | E-Permits Portal | E-Permits Portal Help Center From: NoMa Prospect Neighborhood Association
Sent: Sunday, February 15, 2026 9:04 AM
To: Elizabeth Blanton <[email protected]>; Naomi Powell <
Subject: The Real NoMa Prospect Neighborhood Assoc
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
587
Hi Elizabeth,
Anyhow - we DO live on Main Street and we ARE very connected to our community. We were unable to make the zoning zoom last week but we'd love to have you and Sachiko join us at our monthly board meeting. People from the city join us on a very regular basis.
We typically choose a new restaurant each month and have a meal while discussing how we can make our neighborhood better. I'd describe the energy as laid back and thoughtful.
Our next meeting is in the downtown area this Wednesday at 7pm, restaurant TBD. We did Storybook last month. Are you available to join?
Kindly,
Nathan Downs
--
North Main & Prospect Hill Neighborhood Association
Join Our Facebook Group
President: Naomi Powell
Vice President: Nathan Downs
Treasurer: Jackie Orr
Safety & Services: Carlos Gonzalez
Hazel Garden Lead: Chris Orr
Communication & Membership: Lenae Crowder
Secretary: Vacant
Member at Large: Nathan Williams
588
From: Elizabeth Blanton
To: "Sidles, Philip"; Sachiko Riddle
Cc: "Bell, Courtney"
Subject: RE: Business Friendly Hayward Project - Follow-Up from Data Center discussion Date: Friday, March 27, 2026 8:35:00 AM
Attachments: image003.png
image005.png
image006.png
image007.png
image001.png
Hi Phil and Courtney,
Thanks for your patience on this. After discussing internally, we agree and have amended the draft Code to reflect a two tier system for Data Centers:
1. Data Centers 50+ MW: Major Conditional Use Permit (requiring Council approval)
2. Data Centers <50 MW: Conditional Use Permit (requiring Planning Commission approval) We didn’t think it was appropriate/necessary to create a class of ancillary data centers that are allowed by right for a few reasons:
As a land use, they would be allowed by right currently, and we’ve never seen this type of ancillary data center in Hayward to date.
If the generators are diesel powered, they very likely will still require a use permit for hazardous materials.
Under the new regulations, if a data center came in that was determined by staff to be ancillary to a primary use AND didn’t trigger the need for additional use permit review based on the amount of hazardous materials on site, we could process it under the permitting process required for the primary use.
I’m off for the rest of today, but if you’d like to chat further, let me know, and we can set up a time next week. The draft regs are currently going through an internal review process, but once the staff report and attachments are published for the 4/9 Planning Commission hearing, I’ll be sure to forward to you for your review.
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Elizabeth Blanton
Sent: Wednesday, March 18, 2026 5:12 PM
To: 'Sidles, Philip' < >; Sachiko Riddle <[email protected]> Cc: Bell, Courtney < >
Correspondence Chain 17
589
Subject: RE: Business Friendly Hayward Project - Follow-Up from Data Center discussion Hi Phil,
Thanks for reaching out. We are still discussing internally. I’ll get back to you asap.
Elizabeth
Elizabeth Blanton
Senior Planner | Planning Division
City of Hayward | 777 B Street, Hayward, CA 94541
O: (510) 583-4206 | E: [email protected] Permit Center | E-Permits Portal | E-Permits Portal Help Center From: Sidles, Philip < com>
Sent: Wednesday, March 18, 2026 2:26 PM
To: Elizabeth Blanton <[email protected]>; Sachiko Riddle <Sachiko.Riddle@hayward- ca.gov>
Cc: Bell, Courtney < >
Subject: RE: Business Friendly Hayward Project - Follow-Up from Data Center discussion CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Good Afternoon Elizabeth/Sachiko,
We wanted to check-in to see if you had any questions about these suggestions.
We’re happy to hop on a quick call to talk through it, and we can give some examples of what we’re building-out in other industrial buildings where Data Center and R&D/MFG uses are being placed in the same building. We can’t talk about the tenant and exact locations, but can talk about the business and build-out that these zoning suggestions would help facilitate during permitting.
Thanks,
Phil
Philip Sidles | Director, Entitlements
Pier 1, Bay 1 | San Francisco | California | 94111 | United States of America Direct | Mobile |
www.prologis.com | Follow us on LinkedIn and Facebook
590
The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer.
signature for Sidles, Philip
From: Bell, Courtney < >
Sent: Friday, March 13, 2026 4:56 PM
To: Elizabeth Blanton <[email protected]>; Sachiko Riddle <sachiko.riddle@hayward- ca.gov>
Cc: Sidles, Philip < >; Galvez, Janet <j >; Surdin-OLeary, Danielle < >
Subject: Business Friendly Hayward Project - Follow-Up from Data Center discussion Elizabeth & Sachiko,
To follow-up on our discussions on the Data Center zoning, we’ve put together the attached redline to your zoning code that we think will meet industry trends, and create a pathway for the City Council to review large data center projects.
As we discussed, there is value to provide different permit pathways for different sizes of data centers. Large projects would go through the Major CUP process at City Council, others may
qualify for a regular CUP, while the smallest data centers could be permitted by right.
Providing an easier permit pathway for small scale projects that may occur in conjunction with an advanced manufacturing or R&D use in industrial zones could help attract and retain “high tech” users to Hayward in line with the goals of the Business-Friendly Hayward Project.
Our proposal aligns with examples we've seen in neighboring jurisdictions as well as existing State/CEC regulations. We also took some time to think through how a data center project would work through Hayward's Industrial Design Guidelines so you will see suggested edits in some areas, for example, how to tie into the Major Site Plan Review process if needed.
Given the timeframes for the zoning updates, we thought this redline format would be the 591
most efficient way to get our thoughts over to you to review. We would be happy to walk through it on a call next week to provide further context. Let us know times that work for you, we can make ourselves available first thing Monday/Tuesday next week.
Best,
Courtney
Courtney Bell | Vice President, Entitlements
Pier 1, Bay 1 | San Francisco | California | 94111 | United States of America Direct | Mobile |
www.prologis.com | Follow us on LinkedIn and Facebook
592
Correspondence Chain 18
593
594
595
596
597
598
599
From: Ricardo Badilla
To: Elizabeth Blanton
Subject: Support for Expanding Church Access in Hayward Date: Wednesday, April 15, 2026 7:42:44 PM
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.
Dear Elizabeth,
I hope you are doing well.
I am writing to express my strong support for churches and faith-based organizations having greater access to operate within the City of Hayward, particularly in commercial areas.
Churches play a vital role in our community. Beyond religious services, they provide support systems for families, mentorship for youth, counseling, food distribution, and a sense of unity that strengthens neighborhoods. In many cases, they serve as a resource for individuals who may not otherwise have access to guidance or assistance.
Given the positive impact churches have, I believe it is important to revisit and reduce any unnecessary restrictions that limit their ability to operate or expand within the city. Allowing more flexibility in zoning and permitting would help these organizations continue to serve and uplift the community.
I respectfully encourage the City to consider policies that support and welcome churches as valuable contributors to Hayward’s social and community well-being.
Thank you for your time and for the work you do for our city. I would be happy to support this effort further if needed.
Thank you
Ricardo badilla
Ricardo
600
CITY OF HAYWARD
Hayward City Hall
777 B Street
Hayward, CA 94541
www.Hayward-CA.gov
File #: PH 26-020
DATE: April 21, 2026
TO: Mayor and City Council
FROM: Finance Director
SUBJECT
Master Fee Schedule: Adopt a Resolution Approving the Master Fee Schedule Fiscal Year 2026-2027 and the Fiscal Year 2026-2027 Fine and Bail Schedule, and Finding the Action is Exempt from California Environmental Quality Act Review
RECOMMENDATION
That City Council adopts the attached resolution (Attachment II) adopting the Master Fee Schedule Fiscal Year 2026-2027 (Attachment III) and the Fiscal Year 2026-2027 Fine and Bail Schedule (Attachment IV) updating fees charged for services and fines and bail schedules with approved fee changes effective July 1, 2026
SUMMARY
Staff has completed a comprehensive review of the City’s Master Fee Schedule and Fine and Bail Schedules to identify and determine necessary adjustments to charges. If adopted, changes will become effective July 1, 2026.
A complete and detailed listing of fees is reflected in the attached Master Fee Schedule Fiscal Year 2026 -2027 (Attachment III) and the Fiscal Year 2026-2027 Fine and Bail Schedule (Attachment IV) and, once approved, can be found on the Master Fee Schedule website link found in the City’s website:
<https://www.hayward-ca.gov/your-government/documents/master-fee-schedule>
ATTACHMENTS
Attachment I Staff Report
Attachment II Resolution
Attachment III Proposed Master Fee Schedule Fiscal Year 2026-2027 Attachment IV Fiscal Year 2026-2027 Fine and Bail Schedule CITY OF HAYWARD Printed on 4/17/2026Page 1 of 1
powered by Legistar™
601
DATE: April 21, 2026
TO: Mayor and City Council
FROM: Director of Finance
SUBJECT: Master Fee Schedule: Adopt a Resolution Approving the Master Fee Schedule Fiscal Year 2026-2027 and the Fiscal Year 2026-2027 Fine and Bail Schedule, and Finding the Action is Exempt from California Environmental Quality Act Review
RECOMMENDATION
That City Council adopts the attached resolution (Attachment II) adopting the Master Fee Schedule Fiscal Year 2026-2027 (Attachment III) and the Fiscal Year 2026-27 Fine and Bail Schedule (Attachment IV) updating fees charged for services and fines and bail schedules with approved fee changes effective July 1, 2026, and finds the action exempt from CEQA review.
SUMMARY
Staff has completed a comprehensive review of the City’s Master Fee Schedule and Fine and Bail Schedules to identify and determine necessary adjustments to charges. If adopted, changes will become effective July 1, 2026.
A complete and detailed listing of fees is reflected in the attached Master Fee Schedule Fiscal Year 2026- 2027 and the Fiscal Year 2026-2027 Fine and Bail Schedule (Attachment IV) and, once approved, can be found on the Master Fee Schedule website link found in the City’s website: https://www.hayward- ca.gov/your-government/documents/master-fee-schedule.
BACKGROUND
As part of a general cost recovery strategy, local governments have adopted user fees to fund programs and services that provide direct benefit to a specified user or have limited or no direct benefit to the community.
The City’s Master Fee Schedule and the Fine and Bail Schedule identify the fees for various City services and fines. Where appliable, the fees in the Master Fee Schedule Fiscal Year 2026-2027 are based on recovery for the cost of delivering services, such as building and fire inspections and must comply with provisions of current legislation.
If the City Council chooses to adopt a fee that does not recover the full cost of providing a service, the City must use General Funds to subsize that difference, which reduces funds that may be available to provide other services with community-wide benefits such as public safety or maintenance. Unlike most revenue sources, the City has more control over the level of user fees they charge to recover costs.
Legislative Requirements
Proposition 26 Review and Compliance
In November 2010, California voters approved Proposition 26, which amended Articles XIIIA and XIIIC of the State constitution regarding the adoption of fees and taxes. Proposition 26 seeks to assure that taxes are not 602
disguised as fees: taxes must be approved by voters whereas legislative bodies, such as a City Council, can approve fees.
Proposition 218 Review and Compliance
In November 1996, California voters passed Proposition 218, the “Right to Vote on Taxes Act.” This constitutional amendment protects taxpayers by limiting the methods by which local governments can create or increase taxes, fees, and charges without taxpayer consent.
Proposition 218 requires voter approval prior to imposition or increase of general taxes, assessments, and certain user fees.
The proposed Master Fee, Fine and Bail Schedules have been reviewed for compliance with Propositions 26 and 218 and, in the City Attorney's opinion, are compliant.
DISCUSSION
The most recent comprehensive user fee and cost allocation plan study was conducted by Willdan Financial Services and presented to Council on August 20, 2024. Staff used this fee study as a basis for the proposed updates in this report. To update the 2024 fee study for FY 2026-2027, staff adjusted expenses that have changed since 2024. Due to salary and benefit increases over the past two years, there are significant updates to specific charges. Those changes can be reviewed in Attachment III.
In addition, the Master Fee Schedule Fiscal Year 2026-2027 will include chargeable hourly rates for all staff as a central source for this information. The chargeable hourly rates reflect the comprehensive cost of providing services, including the salary and benefit costs for providing service as well as associated costs such as services and supplies, department overhead and central overhead (City Attorney, Finance, Human Resources).
The following summary of changes in fees by program area reflects any new fees or other structural changes to a charge.
All City Departments
Fees categorized as “All City Departments” are generally associated with administrative citations, late or delinquent payments, copying of materials, and violations of smoking or tobacco ordinance. Charges for violations are proposed to remain the same as the prior year while costs of Administrative Hearing or Reinspection Fees are increasing to recover costs of such activities.
City Clerk
Fees for services performed by the City Clerk’s Office are primarily associated with passport services which are set by the United States Department of State or the United State Post Office. Therefore, these fees are maintained at the same level as the prior year. Staff recommends that other fees are also maintained at the same level as FY 2025-26 as those are minor fees with minimal activity or revenue impact.
Development Services
Most fees for services for the City of Hayward are associated with the Development Services Department.
While a few fees remain at the same level as FY 2025-26, fees are generally increasing between 9% and 27%, with a few fees increasing by a significantly higher percentage due to a previous subsidy.
The following fees are changing to reflect previously adopted resolutions (1) Park Impact Fees: All park impact fees will decrease by 0.6%, in accordance with Section 3 of Resolution 19-245. Detailed changes can be found in Attachment III. 603
(2) Affordable Housing In-Lieu Fees: Fees will be decreased by 0.6% based on January 2026 CCI % change and authorized by Resolution 17-167, as amended by Resolution 23-074. Additional changes are incorporated in Attachment III to simplify language, more clearly capture qualifying projects, simplify administration, improve fee predictability, support small infill development, and account for amendments affecting these fees.
Building Division Fee Adjustments are detailed in Attachment III. Following are structural modifications. (1) Update to the International Code Council valuation table to use the August 2025 ICC Building Valuation Data.
(2) Modification of valuation categories.
(3) Clarifications of circumstances of fee application
(4) Addition of the following fees:
a) Complete Building Demolition
b) Pool Demolition
c) Heat Pump Water Heater
d) Permit Extension Fees
e) Completion Fees
(5) New categories for Equipment Installation
Code Enforcement: Changes in the Code Enforcement Division Fees are primarily associated with clarifications of fee applicability.
Housing Division Fee Adjustments:
(1) Rent Stabilization Administration Fee: The due date for this administration fee is proposed to be modified to align with the annual billing cycle and establishing a Special Assessment for unpaid annual program fees.
(2) Administrative Citation Fine: Staff recommends establishing an this fine of $1,000 for violations of the Tenant Relocation Assistance Ordinance (TRAO), pursuant to Hayward Municipal Code (HMC) Chapter 1, Article 7 and Government Code Section 53069.4. (3) Loan Servicing and Monitoring: Staff recommends the following new fees:
a) Notary Services: Government Code section 8211 specifies the fees that can be charged for notary services.
b) Modification/Transfer Fee to establish cost recovery for staff time and administrative costs associated with reviewing and processing requests for ownership transfers and agreement modifications.
c) Update the subsection title from “Rental Housing” to “Affordable Housing” to more accurately reflect that the fees apply to all affordable development projects and to ensure clarity and consistency in administration.
Planning Division Fee Adjustments are detailed in Attachment III. Structural adjustments are outlined below:
(1) Various clarifications of fee application
(2) Modifications to deposit amounts and categories
(3) Addition of categories for Tree Removal Permit (
≤ 2 trees, 3 to 5 trees, 6 to 8 trees, > 9 trees,
Heritage Trees
604
(4) Addition of Fees:
a) Addition of Tree Pruning Permit
b) Planning, Landscaping Inspection and Reinspection
(5) Subject to approval of resolution associated with the Business Friendly Hayward item to be presented at this Council meeting, Planning recommends the following additions to the fee schedule (specific fees are listed in Attachment III):
a) Accessory Commercial Unit
b) Limited Entertainment Permit
c) Minor Temporary Use Permit
d) Major Conditional Use Permit
Engineering
While a few fees remain at the same level as FY 2025-26, fees are generally increasing between 2% and 20%.
The following new fees are proposed for Engineering and Transportation Services:
(1) Additional Inspections will be charged to customers who require additional inspections after normal work hours or on weekends. The need for further adjustments will be reviewed, and appropriate increases may be proposed in the future.
(2) Construction Inspection, Technical Support, and Project Closeout for Trenchless Construction (5% of Construction Cost prior to permit issuance). This fee is intended to assure these permit account balances remain positive and significantly reduce the staff time currently spent following up on unpaid invoices and contacting billing references. This may also help prevent delays in permit issuance, benefiting the applicant.
(3) Survey Monument Preservation Review Fee to recover the costs of Survey staff reviewing permit applications with potential monument preservation concerns. California Business and Professions Code 8771, (Professional Land Surveyors Act) specifically subsection (d) pertains to permitted construction or maintenance work and states, “The governmental agency performing or permitting construction or maintenance work is responsible for ensuring that either the governmental agency or landowner performing the construction or maintenance work provides for monument perpetuation required by this section.” The creation of this new fee will account for the average staff time-cost associated with this type of review.
(4) Floodplain Review Fee ($4000 -Deposit Time and Materials): The Federal Emergency Management Agency (FEMA) has temporarily suspended processing of Conditional Letters of Map Revision (CLOMR-F) and Letters of Map Revision (LOMR-F) applications, applicants cannot obtain timely federal determinations that would otherwise validate proposed floodplain fill and related design assumptions; accordingly, for fill/grading projects within FEMA Special Flood Hazard Areas, the City must perform enhanced due diligence to confirm that project design and construction will comply with the City’s floodplain management ordinance and remain consistent with applicable FEMA floodplain standards and engineering criteria. To ensure the technical analyses supporting these projects (e.g., hydrologic/hydraulic modeling, floodplain impacts, and associated plans/calculations) are accurate, complete, and defensible, the City needs the ability to retain an independent qualified consultant engineer to conduct a formal peer review, and the proposed deposit/T&M fee is necessary to recover the cost of that third-party review. This proposed fee is a refundable deposit, meaning any funds not used by the end of the project and review process will be returned to the developer. This fee would be used when the City retains an independent, qualified consultant 605
engineer to peer review the applicant’s supporting technical submittals (e.g., hydrologic/hydraulic analysis, plans, and calculations) and provide an independent review for accuracy and completeness.
This will be similar to other fee categories in which as deposit is collected from developers and costs of consultant or staff time is charged against it.
Staff also recommends removing the Major Street Improvement Plan Review. Costs for projects that fall within this category would be recovered through the “Encroachment Permit Application - Major Work” process, or through a formal Capital Improvement Plan (CIP) project.
In addition, staff recommends recategorizing fees from Engineering Services / Survey to Encroachment Permit Application, Minor Work, Survey.
Finance
While a few fees remain at the same level as FY 2025-26, fees are generally increasing between 3% and 20%. There are no new fees or structural changes proposed for Finance.
Fire Department
While a few fees remain at the same level as FY 2025-26, fees are generally increasing between 16% and 21%.
Staff recommends the following modifications to align with state law:
(1) Delete Hazardous Waste Generator Program – Conditionally Exempt Small Quantity Generator (CESQG) as it has been combined with Hazardous Waste Generator – Small Quantity Generator (SQG).
(2) Modify definition for Hazardous Waste Generator – Small Quantity Generator (SQG) to read:
“Small Quantity Generator (SQG) – Less than 1,000 kilograms (approximately 270 gallons or 2200 pounds) per month. Less than one kilogram of acutely / extremely hazardous waste per month. (3) Modify definition for Hazardous Waste Generator – Large Quantity Generator (SQG) to read:
“Small Quantity Generator (SQG) – Less than 1,000 kilograms or more per month (approximately 270 gallons or 2200 pounds) per month or one kilogram or more of acutely / extremely hazardous waste per month.
Staff also recommends modification of the Non-Compliance Fee so that it is a general fee as it is currently only appliable to California Environmental Reporting System (CERS).
In addition, staff recommends adding the following No Show Fees to account for staff time and costs when the applicant does not show up for their appointment.
(1) Fire Prevention Office No Show for Inspection Appointment Fee (2) HazMat No Show for Inspection Appointment Fee
Information Technology
Hourly rates are increasing between 23% and 30%. There are no new fees or structural changes proposed for Information Technology. Information Technology has also provided updated information to support the Technology Fees collected by other departments.
Library
Most fees are maintained at the same level as the prior year. A few facilities charges and materials charges are being updated to align to other fees and reflect changing materials costs.
606
Maintenance Services
Fees are increasing between 15% and 25%. Maintenance Services has also recommended a change to the Bail and Fine Schedule increasing vehicle fines. This proposed increase supports continued compliance with parking regulations while remaining sensitive to community impact. Staff evaluated street sweeping violation fines throughout the region and found variable amounts: for example, Union City charges $110, San Francisco charges $105, and Fremont charges $90.
Police Department
Most fees associated with Animal Control are remaining the same as Fiscal Year 2025-26. For other Police services, fees are increasing between 12% and 25% with a few fees increasing by a significantly higher percentage due to previous subsidy
Public Works and Utilities
Fees are proposed to increase between 5% and 25%.
The department proposes the following new fines:
(1) Fine for Unauthorized Connection to a Fire Hydrant ($2,500/$5,000/$10,000): Water theft committed via the unauthorized connection to a fire hydrant in violation of Hayward Municipal Code Chapter 11, Article 2, Section 11-2.24 is punishable as follows:
a) A fine not exceeding two thousand five hundred dollars ($2,500) for a first violation. b) A fine not exceeding five thousand dollars ($5,000) for a second violation of the same ordinance. c) A fine not exceeding ten thousand dollars ($10,000) for the third violation and each additional violation of the same ordinance.
(2) Fine for Meter Tampering ($130/$700/$1,300): If water theft is committed via meter tampering in violation of an Hayward Municipal Code Chapter 1, Article 3, Section 1-3.00), it is punishable as follows:
a) A fine not exceeding one hundred thirty dollars ($130) for a first violation. b) A fine not exceeding seven hundred dollars ($700) for a second violation of the same ordinance within one year of the first violation.
c) A fine not exceeding one thousand three hundred dollars ($1,300) for the third violation and each additional violation of the same ordinance within one year of the first violation ordinance. (3) Backflow Related Fees for meter lock and meter unlock (service restoration) for backflow customers. The new fees being proposed below are intended to recover costs associated with the staff time, materials, and vehicle costs required to provide these services to customers. a) Additional visits for backflow inspection/test fee
b) Meter Lock Fee due to Non-Compliant Backflow
c) Backflow Service Restoration/Unlock Fee
(4) On-Site Visits Requested by Customers ($50) can be charged to customers who specifically request City staff to make an on-site visit outside of the normal scope of City staff maintenance and repair tasks. This fee is in line with what is charged by EBMUD ($50), ACWD ($50), and DSRSD ($112)
Staff also recommends updates to the Non-Residential Sewer Connection Fee Reduction Language. In Fiscal Year 2009 - 2010, in order to address the impacts of the 2008 recession, a 70% fee reduction to Non-Residential Sewer Connection Fee was introduced and has not been revised since Fiscal Year 2014. 607
Considering the current business conditions in Hayward and in light of the extremely high cost estimated for the Water Resource Recovery Facility (WRRF) Improvement Phase II project currently estimated at $498 million, staff is proposing a phased transition to promote fiscal sustainability, maintain equitable rate structures across the customer base, and reduce financial impacts to the utility over time. Currently the Non-Residential Sewer Connection Fee is reduced by 70% from actual costs. Staff is proposing to gradually modify from a reduction of 70% from actual costs to a reduction of 50% of actual costs beginning in Fiscal Year 2026-27 and gradually increasing that modification over several fiscal years to limit any immediate impact to businesses in Hayward.
In addition, staff recommends similar updates to the carbonaceous biochemical oxygen demand (CBOD) and suspended solids (SS) milligrams per liter amounts due to domestic wastewater strengths having increased over the past several years due to water conservation efforts. Similar to the Non-Residential Sewer Connection Fee, staff is proposing to gradually modify from a reduction of 70% from actual costs to a reduction of 50% from actual costs beginning in Fiscal Year 2026-27 and gradually increasing that modification over several fiscal years to limit any immediate impact to businesses in Hayward
ENVIRONMENTAL REVIEW
This item is exempt from California Environmental Quality Act (CEQA) review pursuant to Section 15273 of CEQA Guidelines which states that CEQA does not apply to the establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, and other charges by public agencies which the public agency finds are for the purposes of:
1. Meeting operating expenses, including employee wage rates and fringe benefits;
2. Purchasing or leasing supplies, equipment, or materials;
3. Meeting financial reserve needs and requirements;
4. Obtaining funds necessary for capital projects necessary to maintain service within existing service areas; or
5. Obtaining funds necessary to maintain intra-city transfers as are authorized by City Charter.
ECONOMIC IMPACT
Approval of the attached resolution may have an economic impact on our community as fees and fines are added and increased. Revenues from fees will be used to provide services.
STRATEGIC ROADMAP
This agenda item is a routine operational item and does not specifically relate to any of the six priorities outlined in the Council’s Strategic Roadmap.
FISCAL IMPACT
Overall, staff anticipates that general fund revenues may increase by at least $1 million for Fiscal Year 2026-
27. Currently, most of the City’s fee do not offset the staff time spent performing the various activities supported by the fees. Adopting these fee changes will more closely align revenues with expenses.
PUBLIC CONTACT
A public notice was published in The Daily Review on March 14, 2026, and March 21, 2026. The public notice contained the meeting date announcing the time, location, and subject matter of this public hearing.
608
NEXT STEPS
Upon approval of the attached resolution the fees will be effective July 1, 2026, to allow for the required sixty-day notice period.
Prepared by: Franchesca Hatfield, Management Analyst
Nicholas Mullins, Senior Management Analyst
Michael Barnes, Acting Deputy Director of Finance/Revenue Manager
Recommended by: DeAnna Hilbrants, Director of Finance
Approved by:
_____________________________
Jennifer Ott, City Manager
609
ATTACHMENT II
HAYWARD CITY COUNCIL
RESOLUTION NO. 26-
Introduced by Council Member
RESOLUTION ADOPTING THE MASTER FEE SCHEDULE FISCAL YEAR 2026-2027 AND THE FISCAL YEAR 2026 -27 FINE AND BAIL
SCHEUDLE REFLECTING UPDATED FEES AND CHARGES FOR
DEPARTMENTS IN THE CITY OF HAYWARD AND FINDING THAT THE
ACTION IS EXEMPT FROM CEQA REVIEW
WHEREAS, as part of a general cost recovery strategy, the City of Hayward has adopted user fees to fund programs and services that provide direct benefit to a specified user.
WHEREAS, in November 1996, California voters passed Proposition 218, the “Right to Vote on Taxes Act.” This constitutional amendment protects taxpayers by limiting the methods by which local governments can create or increase taxes, fees, and charges without taxpayer consent. Proposition 218 requires voter approval prior to imposition or increase of general taxes, assessments, and certain user fees.
WHEREAS, in November 2010, California voters approved Proposition 26, which amended Article XIII C of the State Constitution regarding the adoption of fees and taxes.
Proposition 26 seeks to assure that taxes, which must be approved by the voters, are not disguised as fees, which can be approved by legislative bodies, such as a city council. The proposed Master Fee Schedule (MFS) is compliant.
WHEREAS, the proposed Master Fee Schedule Fiscal Year 2026-27 and the Fiscal Year 2026-27 Fine and Bail Schedule have been reviewed for compliance with Propositions 26 and 218 and, in the City Attorney's opinion, are compliant.
WHEREAS, a public hearing was held on April 21, 2026, to present the Master Fee Schedule Fiscal Year 2026-27 and the Fiscal Year 2026-27 Fine and Bail Schedule.
WHEREAS, Section 15273 of the California Environmental Quality Act (CEQA) Guidelines states that CEQA does not apply to the establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, and other charges by public agencies wh ich the public agency finds are for the purposes of:
1. Meeting operating expenses, including employee wage rates and fringe benefits;
2. Purchasing or leasing supplies, equipment, or materials;
3. Meeting financial reserve needs and requirements;
4. Obtaining funds necessary for capital projects necessary to maintain 610
service within existing service areas; or
5. Obtaining funds necessary to maintain intra-city transfers as are authorized by City Charter; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hayward hereby adopts Master Fee Schedule Fiscal Year 2026 -27 and the Fiscal Year 2026 -27 Fine and Bail Schedule relating to fees and charges for all departments of the City of Hayward incorporated herein by reference and as outlined in the April 21, 2026 , City Council report; either on its face or as applied, the invalidity of one provision shall not affect the other provisions of Master Fee Schedule Fiscal Year 2026 -27 or the Fiscal Year 2026- 27 Fine and Bail Schedule, and the applications thereof; and to that end the provisions of this Master Fee Schedule Fiscal Year 2026 -27 and the Fiscal Year 2026 -27 Fine and Bail Schedule shall be deemed severable.
BE IT FURTHER RESOLVED that the fees and charges adopted by this resolution shall become effective as of July 1, 2026.
BE IT FURTHER RESOLVED that this action is determined to be exempt from CEQA review pursuant to Section 15273 of the California Environmental Quality Act (CEQA) Guidelines based on the findings stated herein.
IN COUNCIL, HAYWARD, CALIFORNIA April 21, 2026.
ADOPTED BY THE FOLLOWING VOTE:
AYES: COUNCIL MEMBERS:
MAYOR:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ATTEST: _______________________________________
City Clerk of the City of Hayward
APPROVED AS TO FORM:
City Attorney of the City of Hayward
611
Effective July 1, 20265
A
dopted Master Fee Schedule
Fiscal Year 20265-20276
Interim Director of Finance: Sharif Etman
DeAnna Hilbrants
ATTACHMENT III
612
2 Table of Contents
Introduction .................................................................................................................................... 3 Proposition 26 Review and Compliance ............................................................................. 3 All City Departments ................................................................................................................... 4 City Clerk .......................................................................................................................................... 6 City Manager ................................................................................................................................... 8 Development Services Department ...................................................................................... 9 Engineering and Transportation Services ....................................................................... 29 Finance ............................................................................................................................................ 36 Fire Department .......................................................................................................................... 38 Information Technology .......................................................................................................... 52 Library and Community Services ........................................................................................ 53 Maintenance Services Department ..................................................................................... 56 Police Department ...................................................................................................................... 59 Utilities & Environmental Services ..................................................................................... 67 Glossary of Terms ....................................................................................................................... 83
613
3 Introduction
The Master Fee Schedule Resolution reports fees for services that are provided to our citizens. Fees that do not recover the full cost of providing the service result in a subsidy which shifts funds away from the critical, high priority needs of job creation, public safety initiatives, utility services, and neighborhood programs.
Before a fee increase was considered the Department responsible for the service demonstrated that the services are being provided as efficiently and effectively as possible. There are a minimal number of fees that were considered for an increase in this year’s amendment. For these fees, each respective department demonstrated that services are provided in a best practice manner, and that all reasonable opportunities for savings have been exhausted. As a result of this critical analysis, only fees for new programs or services have been added. Additionally, other fees have been lowered, deleted, or to clarify actual fees charged for services.
Proposition 26 Review and Compliance
In November 2010, California voters approved Proposition 26, which amended Article’s XIIIA and XIIIC of the state constitution regarding the adoption of fees and taxes. Proposition 26 seeks to assure that taxes, which must be approved by the voters, are not disguised as fees, which can be approved by legislative bodies, such as a city council. The proposed Master Fee Schedule (MFS) was reviewed for compliance with Proposition 26, and in the City Attorney’s opinion, the MFS is compliant.
614
4 All City Departments
A. ADMINISTRATIVE CITATIONS – Authorized by Hayward Municipal Code (HMC) Article 7 – Administrative Citations have fines set pursuant to Government Code (GC) Section 53069 and 36900. Unless otherwise specified by Ordinance, Fee Schedule or Code, the fine amount for any violation of any section of the Municipal Code shall be:
1. First Violation $100.00
2. Second Violation $200.00
3. Third and Subsequent Violations $500.00
B. ADMINISTRATIVE HEARING FEE $761.001,500.00
C. USB FLASH DRIVE $20.00 Each
D. DISHONORED OR RETURNED PAYMENT FROM BANK OR CREDIT CARD
1. If paid within 30 days of notification $25.00 + check amount
2. If paid after 30 days of notification, subject to
forgiveness of all or a portion of the fee by the
Director of Finance
As authorized by California
Civil Code 1719, but not less
than $25.00
E. GROSS HOUSEHOLD INCOME
The State of California annually publishes an Official State Income Limits guideline for each county. This document is available through the California Department of Housing and Community Development website at https://www.hcd.ca.gov/ . Municipal programs offering income-based discounts will use the ‘Alameda County – Very Low Income’ figures to determine eligibility.
F. LATE AND DELINQUENT PAYMENTS
Unless specifically provided otherwise, the manner of payment, delinquency status, and assessment and collection of penalties for delinquent payment of the fees imposed or reflected by this master fee schedule shall be as follows:
DAILY FEE: Due on its effective date and delinquent at 5:00 PM on due date.
MONTHLY FEE: Due on the first day of each month for which licenses, permits, fees are sought and delinquent at 5:00 PM on
the tenth day of the month.
QUARTERLY FEE: Due on the first day of the yearly quarter period and delinquent at 5:00 PM on the tenth day of the first month in which the quarterly fee is due.
ANNUAL FEES: Due on the first day of the established annual period and delinquent at 5:00 PM on the tenth day of the first month in which the annual fee is due.
A late payment fee of $5.00 per month shall be applied to all accounts paid after the established due date.
615
5 The delinquent account(s) shall be assessed an interest charge of one percent (1%) per month of the unpaid delinquent balance and related interest charge. The interest charge shall be applied to all accounts delinquent for any calendar month or portion of such month and shall not be prorated.
If the delinquent payment is paid within 30 days of notification, the interest fee may be subject to forgiveness based on hardship. The Director of Finance shall review and document all interest fees not collected.
G. PHOTOCOPYING OF FILE MATERIALS
1. Black and White Copy – 8½ x 11 inches or 8½ x 14
inches
$0.50 per page for first ten (10)
pages of each document
$0.10 each additional page of same
document
2. Black and White Copy – 11 x 17 inch $1.00 per page for first ten (10) pages of each document
$0.20 per page each additional
page of same document
3. Color Copy – 8½ x 11 inches or 8½ x 14 inches $0.75 per page
4. Color Copy – 11 x 17 inches $1.50 per page
H. RESEARCH OR ANALYSIS OF RECORDS (involving more than 15 minutes)
1. $76.00 per hour (minimum charge of $20.00)
I. SMOKING ORDINANCE
1. Smokers Violating the Ordinance $50.00 per violation
2. Fines for businesses that fail to enforce the smoking ordinance (1) First Offense $1,000.00
(2) Second Offense $1,500.00
(3) Third Offense $2,000.00
J. TOBACCO ORDINANCE
1. Offense Fees
(1) First Offense $1,500.00 Penalty/30 day TRL suspension (2) Second Offense $3,000.00 Penalty/30 day TRL suspension (3) Third Offense $5,000.00 Penalty/30 day TRL suspension or revocation
2. Reinspection Fee $117784.00 per visit
616
6 City Clerk
A. GENERAL SCHEDULE OF CHARGES
1. Certification of Documents $15.00 for first page
$8.00 Each succeeding page
2. Certificate of Residency $15.00 per issuance
3. Photocopying of Public Records
a. Black and White Copy $0.50 per page for the first ten pages
8½ x 11 inches or 8½ x 14 inches $0.10 per page for each additional page of the same document
b. Black and White Copy $1.00 per page for the first ten pages
11 x 17 inches $0.20 per page for each additional
page of same document
c. Color Copy– 8½ x 11 inches or 8½ x 14 inches $0.75 per page d. Color Copy – 11 x 17 inches $1.50 per page
e. Photocopying of FPPC Forms/Statements of
Government Code 81008
$0.10 per page, plus $5 retrieval fee
for reports & statements 5 or more
years old
4. Reproduction of Meetings on USB Flash Drive $20.00 per USB flash drive a. City Council
b. Planning Commission
5. Fee to File “Notice of Intent to Circulate a Petition for Municipal Initiative” (refundable if a sufficient petition is filed within one year) Elections Code 9202 (b)
$200.00
6. Candidate Statement (Election Year)
a. Publication cost of the candidate’s statement in
Sample Ballot Pamphlet set by Alameda County
Registrar of Voters
Cost of printing, handling
7. Notary Service – Government Code 8211 $15.00 per signature
8. Passport Service $130.00 (age 16 and over)
a. Passport Book Fee set by and payable to US
Department of State
$100.00 (under 16)
(note: additional $60.00 for
expedited service)
b. Passport Card Fee set by and payable to US
Department of State
$30.00 (age 16 and over)
$15.00 (under 16)
c. Passport Execution Fee set by US Department of
State, payable to City of Hayward
$35.00
d. Express MailPriority Mail Express service from
City of Hayward to US Department of State. (Rate
set by USPS and is subject to federal adjustment.)
Current Rate $33.25, subject to
federal adjustment. $31.40
617
7 Payable to City of Hayward.
e. Express MailExpedited delivery from US
Department of State to Customer. Rate set by and
payable to US Department of State, and subject to
federal adjustment.
Current Rate $22.05, subject to
federal adjustment. $21.36
618
8 City Manager
A. ADMINISTRATIVE SERVICES
a. Annual Bonds Issue Fees 1/8 of 1% of bond amount
b. Low Income Mortgage Credit 2% of first year’s credit payable as part of State Fee
619
9 Development Services Department
A. BUILDING PERMIT FEES
BUILDING PERMIT FEES CALCULATED BY VALUATION
This includes all new buildings, facilities, additions, tenant improvements and residential remodels. • Valuation is defined as the fair market value of materials and labor for the work. • Valuation shall be the higher of the stated valuation or the figure from the current International Code Council valuation table below. • The current ICC Valuation data table below is adjusted with a regional construction cost modifier for the San Francisco Bay Area of 16%*. * Source: The local modifier is
1.16 times the cost per square foot as published in the Building Standards Journal, April 2002 edition.
• The valuation for tenant improvements, residential remodels or other projects that do not involve new square footage, shall be a minimum of 60% of the cost per square foot in the valuation table below.
Construction Type and Minimum Cost Per Square Foot
International Building Code Group
Building Division staff will help determine the
valuation for occupancies or construction
types not listed in this table. The values below
are based on the August 2025 ICC Building
Valuation Data with the Building Standards
Journal 16% local cost modifier included.
IA IB IIA IIB IIIA IIIB VA VB
A‐1 Assembly, theaters, with stage 395.36 381.29 370.04 355.45 332.14 322.52 309.51 297.67 A‐1 Assembly, theaters, without
stage
362.98 348.91 337.65 323.07 300.04 290.42 277.41 265.57 A‐2 Assembly, nightclubs 315.62 306.37 296.75 285.43 267.34 260.08 243.11 233.89 A‐2 Assembly, restaurants, bars,
banquet
314.46 305.21 294.43 284.27 265.02 258.92 240.79 232.73 A‐3 Assembly, churches 368.42 354.35 343.10 328.51 305.63 296.01 282.99 271.15 A‐3 Assembly, general, community
halls
309.39 295.32 282.91 269.48 245.30 236.83 222.66 211.98 A‐4 Assembly, arenas 361.82 347.75 335.33 321.91 297.72 289.26 275.09 264.41 B Business 349.630 337.21 325.11 311.35 284.35 274.21 254.12 242.46 E Educational 336.53 324.54 313.59 300.41 278.92 264.71 244.13 236.23 F‐1 Factory and industrial 192.35 183.07 171.55 165.08 146.99 139.84 121.89 113.49 F‐2 Factory and industrial, low
hazard
191.19 181.91 171.55 163.92 146.99 138.68 121.89 112.33 H‐1 high Hazard, explosives 179.44 170.16 159.81 152.17 135.61 127.30 110.51 N.P.
H‐2 H‐3 H‐4 High Hazard 179.44 170.16 159.81 152.17 135.61 127.30 110.51 100.95 H‐5 HPM 349.63 337.21 325.10 311.35 284.35 274.21 254.12 242.46 I‐1 Institutional 322.17 310.63 299.54 288.22 263.81 256.73 237.60 229.12 I‐2 Institutional, hospitals 549.67 537.25 525.15 511.39 483.03 N.P. 451.80 N.P.
I‐2 Institutional, nursing homes 319.20 366.78 354.68 340.92 315.66 N.P. 285.44 N.P.
I‐3 Institutional restrained 368.96 356.54 344.44 330.68 306.60 295.30 299.39 262.39 I‐4 Institutional, day care facilities 322.17 310.63 299.54 288.22 263.81 256.73 237.60 229.12 M Mercantile 235.57 226.31 215.53 205.38 186.89 180.78 162.66 154.60 R‐1 Residential, hotels 325.88 314.34 303.25 291.93 266.95 259.86 240.73 232.25 R‐2 Residential, multiple family 272.12 260.58 249.49 238.17 214.63 207.54 188.41 179.93 R‐3 residential, one- and two-family 252.97 246.24 240.33 235.20 227.34 219.24 211.39 198.13 R‐4 Residential, care/assisted living 322.17 310.63 299.54 288.22 263.81 256.73 237.60 229.12 S‐1 Storage, moderate hazard 178.28 169.00 157.49 151.01 133.29 126.14 108.19 99.79 S‐2 Storage, low hazard 177.12 167.84 157.49 149.85 133.29 124.98 108.19 98.63 U Utility, miscellaneous 142.27 134.17 124.26 119.24 106.22 99.50 84.54 80.78 620
10 BUILDING PERMIT FEES CALCULATED BY VALUATION
This includes all new buildings, facilities, additions, tenant improvements and residential remodels
*All sub‐permits (plumbing, mechanical and electrical) are included in the plan check and inspection fees for valuation based projects.
• Once the valuation for the project is established, use the table below to determine the Building Inspection Fee. Several other fees are based on the Building Inspection Fee and this is outlined on the next page.
TOTAL VALUATION
(Materials and Labor) BUILDING INSPECTION FEE
$1 to $500 $5033.66
$501 to $2,000 $50 for the first $500 plus $3.33 4.38 for each additional $100 or fraction thereof, to and including $2,000
$2,001 to $2550,000 $10099.30 for the first $2,000 plus $18.75 20.06 for each additional $1,000 or fraction thereof, to and including $2550,000
$50,001 to $50200,000 $1,000 560.48 for the first $2550,000 plus $10 14.47 for each additional $1,000 or fraction thereof, to and including $5200,000
$50200,001 to $5100,000 $922.332,500 for the first $20050,000 plus $8.33 10.03 for each additional $1,000 or fraction thereof, to and including $1500,000
$1500,001 to $1,0500,000 $5,000 1423.76 for the first $500100,000 plus $7.00 8.02 for each additional $1,000 or fraction thereof, to and including $1,0500,000
$500,001 to $1,000,000 $4632.79 for the first $500,000 plus $6.81 for each additional $1000 or fraction thereof, to and including $1,000,000
$1,000,001 and up $8,500 8038.50 for the first $1,000,000 plus $54.52 for each additional $1,000 or fraction thereof
621
11 BUILDING PERMIT FEES CALCULATED BY VALUATION
This includes all new buildings, facilities, additions, tenant improvements and residential remodels.
Please Note: All sub‐permits (plumbing, mechanical and electrical) are included in the plan check and inspection fees for valuation‐ based projects. This worksheet includes fees specific to building permit applications from multiple departments.
INSPECTION FEES
* For projects that require
landscape or planning
inspections a minimum of 1
hour will be charged.
Additional hours may be
charged depending on the
scope of work.
BUILDING INSPECTION FEE From valuation table on previous page. $ FIRE INSPECTION FEE Flat Rate $398262
HAZ‐MAT INSPECTION FEE Flat Rate $397215
LANDSCAPE INSPECTION FEE* Flat Rate $498476
PLAN REVIEW FEES
* For building permit master
plan reviews, the formula is
calculated at 1.25% of the
Building Inspection Fee. Flat
rate reviews such as Solid
Waste, Housing also apply to
master plan reviews.
** Plot plan review fees only
apply to production homes.
Additional fees will apply.
Note: Additional impact fees
and/or taxes will apply.
BUILDING INSPECTION FEE x 1.0 = BUILDING PLAN CHECK FEE* $ BUILDING INSPECTION FEE x .35 = PLANNING REVIEW FEE $
BUILDING INSPECTION FEE x .35 = FIRE REVIEW FEE $
HAZ‐MAT REVIEW FEE – See Haz-Mat fees in master fee
scheduleVarious Flat Rates – Call 510‐583‐4900 for an estimate based on project scope.
$
SOLID WASTE REVIEW FEE Flat Rate Depending on Scope ‐ Single‐ Family or Remodel: $7762, Tract Development: $200250, Commercial TI with trash enclosure: $15087, Commercial TI without trash enclosure: $10025 $
HOUSING REVIEW FEE Flat Rate Depending on Scope ‐ Buildings with 1 to 4 dwelling units: $474. Buildings with 5 or more dwelling units: $790 ADUs: $158
$
BUILDING PLOT PLAN REVIEW FEE** Flat Rate $454 381
HOUSING PLOT PLAN REVIEW FEE** Flat Rate $474
MASTER PLAN REVIEW* For residential tracts, see note on left $316 PLANNING PLOT PLAN REVIEW FEE** Flat Rate $747587
ADMINISTRATIVE FEES BUILDING INSPECTION FEE x .09 = TECHNOLOGY FEE $ BUILDING INSPECTION FEE x .16 = POLICY PLANNING FEE $
BUILDING INSPECTION FEE x .35 = PERMIT ISSUANCE FEE $ 190 CALIFORNIA STATE FEES SMIP FEE RESIDENTIAL: .00013% OF VALUATION $ SMIP FEE COMMERCIAL: .00028% OF VALUATION $
CA BUILDING STANDARDS FEE $
$1.00 (Valuation $1-25k)
$2.00 (Valuation $25-50k)
$3.00 (Valuation $50-75k)
$4.00 (Valuation $75-100k) Add $1 per every 25k over 100k
BUILDING PERMIT FEE $
This total only reflects plan review fees, administrative fees and inspection fees for a building permit. Most projects will have other fees and taxes in addition to the total shown here. Please contact each reviewing group for a full assessment of these additional costs.
622
12 FLAT RATE PERMIT FEES
These items will also have administrative fees added to the permit. In some cases, hourly plan review fees will also be required.
Miscellaneous Permit Fees – Not Calculated by Valuation Unit Fee
1. Standard Hourly Rate (or fraction thereof) for plan check, inspections or other administrative services
Hourly $227190
a. Overtime Rate for Plan Check or Inspection Services Hourly $340286
2. Revision (permit issuance fee and hourly plan check will also be charged)
Hourly
$227190
3. Flat Rate Permit Issuance Fee (applies to all permitsfor projects that are not valuation based)
Hourly $227190
4. Miscellaneous Items (for items that do not have a set fee) Each $227190
5. Plot Plan Review
a. Planning Division Plot Plan Review Each Plot $747681 b. Building Division Plot Plan Review and processing Each Plot $454381
6. Address Assignment (including apartments, units, suites, ADUs, meters, etc.)
Each $340
a. New Address (including apartments, units, suites, meters, etc.) each $286 b. Accessory Dwelling Unit Address each $95
Inspection Fee
7. Demolition *Hourly plan check fees may apply depending on scope $381Inspection Fee
a. Complete Building Demolition (Commercial/Residential) Each $454 b. Minor Residential Demo (removal of patio covers, accessory structure or similar exterior elements. Removal of interior walls requires a residential remodel permit.
Each $11495
c. Pool Demo Each $454
8. Equipment Installation $381
a. Additional Equipment at Same SiteFirst Pieces First Piece $454$190 b. Additional Equipment at Same Site Each $227
c. Equipment Pad Each $340286
9. Voluntary Residential Seismic Retrofit Using “Plan Set A” - Only applies to single family homes with a crawlspace less than or equal to 4 feet high
Each $340 190 flat rate
–
no admin fees
10. Damaged Building Survey Fire, flood, vehicle, or similar damage $908763
11. Patio Covers
a. Patio Cover (requires drawings and hourly plan check) Each $340294 b. Enclosed Patio (requires drawings and hourly plan check) Each $681588
12. Photovoltaic Systems
Residential – Up to 15kW (for systems that are not flush mounted, hourly plan check fees apply)(for systems that are not flush Each System $454Up to 15kW
$450, $15 per kW
623
13 mounted, hourly plan check fees apply) above 15kW
a. Commercial, up to 50 kilowatts (hourly plan check fees) Each System $1,2201000 b. Commercial, each additional kilowatt 51KW-250kW (hourly plan check fees apply)
Each System $97
c. Commercial, each additional kilowatt over 250kW (hourly plan check fees apply)
Each System $65
13. Residential Package Permits
a. Tub/Shower Enclosure (includes trades) $227190
b. Remodel – Complete Bathroom (includes trades) $340286 c. Remodel – Kitchen (includes trades) $681572
14. Storage Racks
a. Up to 100 linear feet First 100 lf. $681572
b. Each additional 100 linear feet Each 100 lf. $227190
15. Deferred Submittal (may require additional hourly plan review fees)
Each $908
16. Phased Approval Permits (additional valuation - based fees apply)
Each $908
FLAT RATE PERMIT FEES
These items will also have administrative fees added to the permit. In some cases, hourly plan review fees will also be required.
Plumbing Mechanical & Electrical Fees – Not Calculated by Valuation
17. Plumbing Permits – Residential (single‐family and duplexes) a. Water Heater/Gas Each $11395
b. Heat Pump Water Heater Each $227
c. Fixtures – covers 2 Inspections for any type or number of fixtures
Each2 site
visits
$227190
d. Water Service Repair / Replacement Each $11395
e. Water Pipe (Repair or Replacement) Each $227190
f. Sewer on private property or Cleanout Installation Each $227190 g. Sewer Ejector System Each $227190
h. Solar Water Heating System - Hourly plan check fees may apply for systems that are not flush mounted or have other structural issues.
Each $227190
i. Residential Gas Piping Each $227190
j. Residential Gas Test or Meter Reset Each $227190
18. Plumbing Permits – Commercial + Multi‐Family
a. Water Heater (Repair or Replacement) Each $227190
b. Water Service (Repair or Replacement) Each $227190
624
14 c. Sewer Ejector System Each $227190
d. Industrial / Commercial Process Piping System Each $454190 e. Gas Piping Each 100 linear
feet or fraction
thereof
$227190 /100
feet
f. Gas Test/Meter ReadingReset Each $227190
g. Sewer on private property or Cleanout Installation Each $227190 h. Grease Trap Each $227190
i. Grease Interceptor Each $454190
j. Vacuum Breaker, Backflow Preventer or Pressure Regulator Each $227190
19. Mechanical Permits – Residential (single‐family and duplexes) a. Heating and/or Cooling Equipment (including ducts) Each $340190 b. Wall Furnace Each $227190
c. Kitchen Hood and Bathroom Vents Each $11395
20. Mechanical Permits – Commercial + Multi‐Family
*For units over 400 pounds or for replacements that are not in the same location, hourly plan review fees apply.
a. *HVAC unit (includes all associated sub-permits) Each $340286 b. *Air Handler Unit Each $227190
c. Vent System Each $227190
d. Exhaust Hood Replacement (additional hourly plan check may apply)
Each $227190
21. Electrical Permits – Residential (single‐family and duplexes) a. General Electrical Permit – Residential (rough and final) Each $340286 b. Residential E.V. Charger Each $11395
c. Service Upgrade – Residential Each $11395
d. Meter Rest Each $11395
e. Temporary Power Installation Each $227190
f. Minor Residential Electrical Permit (final only – no rough) Each $227190
FLAT RATE PERMIT FEES
These items will also have administrative fees added to the permit. In some cases, hourly plan review fees will also be required.
Inspection Fee
22. Electrical Permits – Commercial + Multi‐Family
a. General Electrical Permit – Commercial + Multi-Family (rough and final)
Each $681572
b. Commercial E.V. Charger (may require additional hourly plan review)
Each $454381
625
15 c. Commercial Service Upgrade Each $227190
d. Commercial Meter Reset Each $22795
e. Minor Commercial Electrical Permit (final only – no rough) Each $340286 f. Signs (illuminated exterior signage) Each $227190
Additional Services and Violations – Not Calculated by Valuation Unit
23. Special Review Services
a. Expedited Hourly Plan Review Hourly $340286
b. Expedited Plan Review Each 200% of plan
review
c. Phased Approval Permits Each $908763
d. Temporary Certificate of Occupancy Each $1,816527
e. Alternate Materials and Methods Review Each $908763
24. Copies, Re‐Print + Change of Contractor
a. Printing Scanned/Archived Drawing Each $10 per sheet b. Job Card/Permit Re-Print Each $11395
c. Change of Contractor Each $227190
25. Special Inspector Qualification Review
a. Initial Review for Approved Inspector List Each $908763 b. Renewal Review (after 3 years) Each $454381
26. Violation Fees
a. Investigation Fee for work done without Permits (in
addition to the regular permit fees)
Each project 205% of the
Building Permit
b. Filing of Notice of Substandard or Hazardous Structure Hourly $227109 c. Removal of Notice of Substandard or Hazardous Structure Hourly $227 d. Placards for Condemnation Hourly $227109 per
hour
e. Notice and Order Hourly $227109 per
hour
f. Stop Work Order/Red Tag Hourly $227109 per
hour
27. Permit Extension Fees
a. First Extension Each $227
b. Second Extension Each $454
c. Third Extension and Beyond Each $908
28. Completion Permits
*Based on percentage of work that passed inspection prior to the expiration of the renewed permit (Ordinance 105.5.2 – Fees for Completion Permits)
626
16 Completed Inspections % of Updated Valuation
a. None 60
b. Foundation 55
c. Under-floor 50
d. Shear Wall 40
e. Rough Frame 30
f. Lath of Gypsum Board 20
g. All, except Final 10
B. PLANNING
1. Conceptual Development Review Meeting1
**Subsequent meetings related to same project/project site UNITNo
charge for
1st meeting
Subsequent
meetings** billed
at $392 per hour
a. Residential No Charge for
1st review
$1,245 Per
subsequent
review (starting
2nd review)
b. Commercial & Mixed Use $ 1,245 per review
**Subsequent meetings related to same project/project site
2. SB330 Preliminary Application $ 12,000 Time &
Material; Initial
deposit2
3. Code Assistance Meeting3 No Charge
4. Review of Business License Application $ 124 Per License
5. Annexation Proceedings
Costs shall also include, but not be limited to, current annexation filing fees established by the Board of Equalization in manner provided by the State Government Code Section 54902.5.
$ 15,000 Time &
Material, Initial
Deposit2
6. LAFCO Utility Service Agreement
(Preparation and processing of documents in connection with utility service to property outside of the City limits) $ 5,000 Time &
Material, Initial
Deposit2
1 It is recommended that major projects be reviewed at a Pre-Application Meeting prior to submittal of a Development Review Application. A Code Assistance Meeting is also recommended involving project design to allow professionals to address technical code questions.
2 This is an initial deposit only to cover staff labor hours and materials. The hourly rate may vary by department; the hourly rate of Planning staff is $195.80249. Materials being deducted from deposits may include costs associated with he distribution of required public noticing, such as legal ads and post cards; an overhead charge of $0.10 per post card (in addition to applicable postage costs) will be applied to cover material and administrative costs. If during the review of the project the Planning Director estimates that the charges will exceed the deposit, additional deposit(s) will be required. Also, the Planning Director may authorize a lesser initial deposit than shown if he/she determines that processing of an application will not entail need for the full initial deposit. Prompt payments of deposits or outstanding fees owed in association with the application will assure continued staff review of the project.
Any surplus deposit remaining shall be refunded promptly upon project completion. 3 It is recommended that major projects be reviewed at a Pre-Application Meeting prior to submittal of a Development Review Application. A Code Assistance Meeting is also recommended involving project design to allow professionals to address technical code questions.
627
17 7. Environmental/Technical Analysis (Contract) Consultant $ 5,000 Time & Material, Initial
Deposit2
8. General Plan Amendment1 $ 152,000 Time &
Material, Initial
Deposit2
9. Text Change to Zoning Ordinance1 $ 1512,000 Time &
Material, Initial
Deposit2
10. Rezoning and Pre‐zoning (including new or major modification to a Planned Development)
$ 1512,000 Time &
Material, Initial
Deposit2
11. Rezoning (Planned Development Precise Plan or Preliminary Plan Minor Modification)
$ 4,0006,000 Time
& Material, Initial
Deposit2
12. Conditional Use Permit1 $ 8, 0006,000
Time & Material,
Initial Deposit2
13. Major Conditional Use Permit $ 15,000 Time &
Material, Initial
Deposit2
13.14. Administrative Use Permit1
a. Livestock $ 500 Per
Application
b. Food Vendors $ 700 Per
Application
c. All Others Processed Administratively $ 4,000 Time & Material, Initial
Deposit22,000
Time & Material;
Initial Deposit2
d. Processed Administratively 2,000 Time &
Material; Initial
Deposit2
e. Involving Public Hearing $ 6,000 Time &
Material; Initial
Deposit2
14.15. Site Plan Review1
a. Processed Administratively $ 4,000 Time &
Material, Initial
Deposit2
b. Involving Public Hearing $ 6,000 Time &
Material, Initial
Deposit2
15.16. Major Site Plan Review $ 8,000 Time &
628
18 Material, Initial
Deposit2
16. Variance/Warrants – Processed Administratively $ 6,000 Time & Material; Initial
Deposit2
17. Variances, Including Warrants & Exceptions 2,000 Time & Material; Initial
Deposit2
a. Processed Administratively $ 6,000 Time &
Material, Initial
Deposit2
b. Involving Public Hearing $ 8,000 Time &
Material, Initial
Deposit2
18. Minor Modification of Approved Development Plan –
Processed Administratively
$ 6,000 Time &
Material, Initial
Deposit2
19. Major Modification of Approved Development Plan –
Involving Public Hearing
$ 68,000 Time &
Material; Initial
Deposit2
20. Extension of Approved Development Plan/Applications $ 1,000 Time & Material; Initial
Deposit2
21. Designation of Historical or Architectural Significance1 $ 6,000 Time & Material; Initial
Deposit2
22. Development Agreement
a. Review of application, negotiation of agreements,
processing through Planning Commission and City Council $ 15,00012,000
Time & Material;
Initial Deposit2
b. Amendment Processing $ 6,000 Time &
Material; Initial
Deposit2
c. Annual Review $ 1,000 Time &
Material; Initial
Deposit2
23. Written Zoning Verification Letter of Zoning Designation or Similar Request
$ 747587 Flat Fee
24. Research, Meetings, & Hourly Rate $ 249 Flat Fee 195 per hour after
25. Zoning Conformance Permit
a. Tier One: Apiaries/Unattended Collection Boxes $ 373 Fixed Fee 293 Per
Application
629
19 b. Tier Two: Household Pets (when required) $ 124 Fixed Fee 98 Per Application
c. Tier Three: Accessory Dwelling Units $ 498 Fixed Fee 392 Per Unit
d. Tier Four: Outdoor dining $ 747 Fixed
Fee587
e. Accessory Commercial Unit $ 498 Fixed Fee
26. Sign Permits
a. Sign Permit (one business) $ 498392
b. Sign Permit (each additional business – same application) $ 498392 c. Temporary Sign Permit (Banners, Flags, Streamers,
Pennants, Buntin, Searchlights, Inflatable Signs, Human Signs) *Temporary sign deposits to be refunededrefunded upon removal of signage
$ 498100 Fee Plus
200 Deposit*
d. Portable/A-Frame Signs $ 10050
Encroachment
Permit
e. Mural Art $ 10050
*Note: Revocable Encroachment Permit also applies to Human signs in the public right of way, see Engineering and Transportation section for applicable fee(s).
27. Sign Program $ 1,000 Time &
Material; Initial
Deposit2
28. Appeal Fee – For for Applicant $ 6,000 Time &
Material; Initial
Deposit2
29. Appeal Fee – Other Than Applicant $ 747490
30. Tentative Tract or Tentative Parcel Map, Including Vesting $ a. Processed Administratively $ 6,0004,000 Time
& Material; Initial
Deposit2
b. Involving Public Hearing $ 8,000 6,000 Time
& Material; Initial
Deposit2
31. Landscape Lighting Assessment District Benefit Zone Annexation & Formation
$ 15,000 Time &
Material; Initial
Deposit2
32. Lot Line Adjustment $ 4,000 Time &
Material; Initial
Deposit2
33. Certificate of Merger or Certificate of Compliance $ 4,000 Time & Material; Initial
Deposit2
630
20 34. Security Gate Application $ 2,000 Time &
Material; Initial
Deposit2
35. Street/Special Event Permit $ 4,1132,944
The Development Services Director or designee may reduce or waive this fee for certain events. (See Fee Reduction, Waiver, and Sponsorship for Special Events Policy)
36. Tree PreservationRemoval Permit
a. Annual Pruning Certification $ 817 Fixed Fee
b. Tree Removal/pruning Permit*
A Minor Encroachment Permit may also be required – See
Engineering Services Section
490
i. ≤ 2 trees $ 498 Fixed Fee
ii. 3 to 5 trees $ 996 Fixed Fee
iii. 6 to 8 trees $ 1,245 Fixed Fee
iv. ≥9 $ 1,000 Deposit
v. Heritage Tree $ 1,000 Deposit
c. Tree Pruning Permit
i. ≤ 2 trees $ 249 Fixed Fee
ii. ≥ 3 trees $ 747 Fixed Fee
iii. Heritage Tree 498 Fixed Fee
c.d. Investigation and Violation Fee – Work done without Permits (in addition to the regular permit fees)
200% of Tree
Permit Fee
37. Mobile Home Park Closure / Change of Use $ 11,7489,814
38. Inspections – Planning and Landscape
a. Code Enforcement Compliance Inspection Fee $ 424162
b. Planning, Landscaping Inspection and Reinspection
FeeLandscape Inspection and/or Re-inspection Fee
$ 249 Fixed Fee
196 Per Hour
39. Review of Ministerial Planning Applications
a. Applications that do not Include a Tentative Map $ 4,000 Deposit b. Applications that Involve a Tentative Map $ 6,000 Deposit
40. Limited Entertainment Permit $ 249
41. Minor Temporary Use Permit $ 747
39.42. Policy Planning Fee 16% of Building
Permit Fee
40. Review of Ministerial Planning Applications 4,000 Deposit for applications that
do not include a
Tentative Map
$6,000 Deposit
for applications
631
21 that involve a
Tentative Map
41.43. Park Impact Fee – Residential
Residential $
a. ADU that is 750+ s.f. $ 3,3793,812
b. Studio/0-bedroom Unit $ 3,7893,812
c. 1 Bedroom Unit $ 5,9315,967
d. 2 Bedroom Unit $ 10,69910,764
e. 3 Bedroom Unit $ 18,68518,798
f. 4+ Bedroom Unit
Industrial Development (Industrial us in IL, IP, or IG zoning district)
$ 25,99126,148
g. Gross Floor Area $ 0.950.96 per s.f.
Notes:
1. Bedroom”, “dwelling unit”, “gross floor area”, as defined by HMC Sec. 10-1.3500.
2. Projects receiving all discretionary approvals by the effective date of this Resolution shall be subject to the parkland dedication and in- lieu fee requirements in effect immediately prior to the effective date of Resolution 19-245.
42.44. Affordable Housing In‐Lieu Fees
1. Residential Development Projects – Ten Units or More a. High-Density Condominiums (35 units per acre or more. $ 19.2233/Square Foot of Habitable
Space*
b. Lower Density Ownership Housing (Less than 35 units per acre)
$ 25.8297/Square
Foot of Habitable
Space*
c. All other Dwelling Unit Types $ 23.3044/Square
Foot of Habitable
Space*
*Notes:
Affordable housing in-lieu fees shall be paid either prior to issuance of a building permit or prior to approval of a final inspection or issuance of an occupancy permit. Fees paid at occupancy shall be increased by 10 percent (10%).
"Habitable Space" means floor area within a Dwelling Unit designed, used, or intended to be used exclusively for living and sleeping purposes and exclusive of vent shafts, eaves, overhangs, atriums, covered entries and courts and any portion of a structure above ground used for parking, parking aisles, loading areas, or accessory uses.
2. Residential Development Projects – Less Than Ten Two to Nine Units Fee calculated pursuant to Section 44.1 above:Projects of two to nine units shall pay the following percentage of the fee calculated pursuant to Section 40.1 above:
632
22 Number of Units in the
ProjectResidential Development
Projects
Percentage of Calculated Fee
2<10 50%
3 67%
4 75%
5 80%
6 83%
7 86%
8 88%
9 89%
2.3. Fractional Units
If an applicant provides on-site Affordable Units under Chapter 10, Article 17 of the Hayward Municipal Code and elects to pay affordable housing in-lieu fees for a fractional unit, the fractional in-lieu fee payment shall be calculated as follows:
Fractional Unit/Total Affordable Unit Requirement x Per Square Foot Fee x Total Habitable Square Footage in the Project
3.4. Applications for Residential Development Projects of Two or More Units Deemed Complete as of December 20, 2017
a. Projects receiving all discretionary approvals by February 1, 2018: Affordable housing impact fees in effect on December 20, 2017.
b. Projects not receiving all discretionary approvals by February 1, 2018, provided that all discretionary approvals and building permit(s) are obtained within two (2) years of December 20, 2017: 50% of the affordable housing in-lieu fee calculated under either Section 3.1 or Section 3.2 of RES 17-167, and as amended, as applicable, depending on the size of the project.as applicable depending on the size of the project.
43.45. Mills Act/Williamson Act Program
a. Mills Act/Williamson Act Program $$2,000 2,000 Time & Material Initial
Deposit
b. Mills Act Annual Compliance Inspection $$387 498 Fixed Fee
C. CODE ENFORCEMENT COMMUNITY PRESERVATION PROGRAMS
1. General Administration Fees (Applicable to all Code
Enforcement Programs/Cases
a. Abatement Cost $1,477.00 +Contract cost
b. Administrative Hearing Fee (Code Enforcement Cases) $1,276.00 c.a. Code Enforcement Re-inspection Fee $$696.00 784
d.b. Code Enforcement Request for Postponement Fee $ 423 e.c. Impound Fee (Un-permitted Mobile Vending) $ 573
f. Hourly Inspection Fee (past initial 2 hours) $$474.28 $218 633
23 g. Legal Consultation Fee $$480.00 $667
h. Lien/Special Assessment (per parcel): Code Violations $$1,858.00 $573 i.d. Monthly Storage Fee (Mobile Vending Equipment) $$218.00 218 j.e. No Show on Inspection Fee $$667.00 667
k. Police Standby and Safety Fee $$309.00
l. Special Assessment (per parcel): Unpaid Annual Program Fees
$$806.00
m.f. Impound Fee (includes 3 hours of Code Enforcement Staff Time)
$$448.00 573
n.g. Storage Fee (flat rate pallet and handling fee) $$218.00 218 o.h. Request for Postponement of Inspection
(1) First Request $ 423 Flat Rate
a. First Request for postponement penalty First Request Free of Charge
(1)(2) Second Request for postponement penalty $ 423 Flat Rate+400 penalty
(2)(3) Third & Subsequent request for postponement
penalty
$ 423 Flat
Rate+$800
penalty
(3)(4) “No Show” for Inspection Appointment Penalty $ 667 Flat Rate+$1,600
penalty
2. Violation of Community Preservation, Sign, Vehicle, Weed Abatement, Building, Public Nuisance, Zoning Ordinances, and HMC Code violations
a. First Violation
(1) Initial inspection Fee (upon violations found) No Violations- free of charge
$773
(2) Penalty for initial violation (upon first failed re- inspection)
$400
(3) Penalty for second violation (upon second failed re- inspection)
Penalty $800
(4) Penalty for third and Subsequent violations Penalty $1,600 b. Subsequent violation(s) within 1 year
(1) Subsequent Case Initial inspection Fee $784 $743
(2) Subsequent Case Initial Inspection Penalty Penalty $800 (3) Subsequent Case Re-inspection Fee $626 $784
(4) Subsequent Case Re-inspection Penalty Penalty $1,600
3. Egregious Violation(s) Penalties
On-going health and safety violations, public nuisances and illegal uses, including but not limited to: garage conversion, room additions, unauthorized short-term rentals, accessory structures, construction without permits, home occupation, use permits or site plan review, unpermitted uses 634
24 related to environmental hazards.
a. Tier 1 for first verified violation(s) Penalty $1,500 b. Tier 2 for second verified violation(s) Penalty $3,000 c. Tier 3 for third and subsequent verified violation(s) Penalty $5,000
4. Tobacco Retailer License, Initial or Renewal Fee Annual Fee$400
$722
Initial Inspection No Charge
a. First Offense Penalty/30-
day TRL
suspension
$1,500
b. Second Offense Penalty/30-
day TRL
suspension
$3,000
c. Third Offense Penalty/30-
day TRL
suspension
$5,000
5. Cannabis Licensing Program, License Renewal, Inspection, Penalties Fees
a. Preliminary Determination of Eligibility/Screening
Application
$2,500
b. Initial Commercial Cannabis Business Permit Application $15,000 *Covers cost of consultant review of business and operating plan, initial site inspections to verify compliance by applicable City staff, administrative costs, and program management, including HPD decoy operations.
c. Annual Cannabis Permit Renewal Fee, Per License Type *Covers cost of follow-up site inspections to verify compliance and related administrative costs
Delivery $5,000
Distribution $5,000
Cultivation $8,000
Manufacturing $8,000
Retail Dispensaries (Storefront) $10,000
Microbusiness (includes all activities) $20,000
Testing Labs $3,000
d. Temporary Cannabis Permit Activity Deposit/
Hourly
$2,500
e. Modification to Existing Commercial Cannabis Permit
*Does not include revisions to Planning Entitlements
Deposit/
Hourly
$2,000
f. Employee Work Permit Application Fee
(1) Initial Application Fee
(Including, but not limited to: Fingerprints, Live
Scan, and Badge)
$299
635
25 (2) Renewal Fee w/o Live Scan $160
g. Inspection Fees
(1) Initial Inspection $0
(2) Code Enforcement-Reinspection $696 $784
h. Penalties for Non-Cultivation Related Violations
(1) First Violation $5,000
(2) Second Violation $10,000
(3) Third Violation $15,000
(4) Selling Cannabis Product to a Minor /Incident $2,500 i. Penalties for Cultivation Violations
(1) First Violation Per
Plant$1,000
$5,000
(2) Second Violation within 2 years Per Plant $2,500
(3) Third Violation within 2 years Per Plant $5,000
6. Grading or Encroachment Permit
a. Code Enforcement Investigation fees, for permit not
obtained
Fee $2,000
7. Building Violation Fees
a. Investigation Fee for work done without Permits (in
addition to the regular permit fees)
Fee $2,3000 $2,300
b. Filing of Notice of Substandard or Hazardous Structure Per Hour$280 $305 c. Removal of Notice Substandard or Hazardous Structure Per Hour$280 $305 d. Placards for Condemnation Per Hour$280 $305
e. Notice and Order Per Hour$280 $305
8. Vacant Property Monitoring
Annual Vacant Property Registration and Monitoring Fee $2,607 (minimum of
one inspection
per year)
$2,371 (Minimum
of one inspection
per year)
Program Fees:
Initial Inspection, No Violation Found 988 $1,048 (If a violation found)
Reinspection Fee $784
Initial Inspection, Violation Found Penalty $1,500
2nd Re-Inspection, Violation Found Penalty $3,000
3rd and Subsequent Re-inspection, Violations Found Penalty $5,000
D. CODE ENFORCEMENT – RENTAL HOUSING & HOTEL INSPECTION PROGRAM
1. Annual Fee for Rental Housing, Hotel or Motel
636
26 a. Single-family, Duplex, Triplex, or Fourplex $125 b. Five or more units Per Unit $35
2. First Request for Postponement of Initial Inspection or Progress Check
No Charge
3. Inspection, Report, and Enforcement Actions Pursuant to HMC, Ch. 9, Art. 5, Rental Unit Parce
a. Initial Inspection, No Violation Found $988No
Charge
(Included in
annual fee)
b. Code Enforcement-Re-inspection Fee (single unit) $696 $784 c. Code Enforcement-Multi-family Re-inspection Fee (per unit)
$175 $180
d. First Progress Check, Violations not corrected Penalty $400 e. Second Progress Check Penalty $800
f. Third and Subsequent Progress Checks Penalty $1,600
4. Rental Inspection No Access Fee and PenaltiesInitial Inspection or Progress Check, No Access or Re‐schedule
a. No Access Administrative Fee (upon no access on
scheduled rental $423 inspections)First Site Visit
$423 $512
b. First Failed Site Access PenaltySecond Site Visit Penalty $512 c. Second Failed Site Access Penalty Penalty$800 penalty d.c. Third and Subsequent Visit Failed Site Access Penalty Penalty$1,600 $512
E. CODE ENFORCEMENT ADMINISTRATION
1. Lien/Special Assessment (per parcel): Unpaid Annual Program Fees
$921
2. Lien/Special Assessment (per parcel): Code Violations $1,858 $2,134
3. Hearing Fee: Administrative, Special Assessment,
Administrative Citation, and Lien Hearings)
$1,276 $1,500
4. Abatement costs (per parcel) $1,477 $1,555+
Contractor Costs
5. Hourly Code Enforcement Inspection Fee (Applicable to all Code case Types above initial 2 hours with continuing
violations)
474.28 $525
6. Police Standby Safety Fee $309 $346
7. Legal Consultation $480 $530
5. Rent Control Deregulation Inspection pursuant to
Ordinance No. 83‐023 as amended.
a. Initial Inspection/Survey and one Re-inspection $938
637
27 F. HOUSING
1. Rent Stabilization Administration
a. Annual Fee per Rental Unit $32
b. Annual Fee per Covered Rental Unit $66
c. Annual Fee per Mobile-home Space $5
d. Special Assessment (per parcel): Unpaid Annual Program Fees
Per Parcel $921
The fees set forth herein shall be payable immediately and shall be delinquent if not received by the Housing Division on or before 5 p.m., August October 31.
2. Tenant Relocation Assistance Ordinance Hearings
a. Hearing Fee: Administrative, Special Assessment,
Administrative Citation, and Lien Hearings
Per Hearing $1,500
b. Administrative Citation Per Citation $1,000
3. LOAN SERVICING AND MONITORINGLoan Servicing and
Monitoring
General
a. Title Report Per Report Actual Costs
b. Property Appraisal Report Per Report Actual Costs
c. Recording Fee Per Document Actual Costs or
$50 minimum
d. Document Preparation Fee Per Document $100
e. Notary Service - Government Code 8211 Per Signature $15 Homeownership Loan Programs
a. Refinance/Subordination Fee (does not apply to CDBG
and HOME)
Per
Transaction
$600
b. Late Payment Fee Payment after
15 days
The greater of
6% Monthly Loan
or $5 minimum
Below Market Rate Program Fee
a. Refinance/Subordination Fee Per
Transaction
$600
b. Modification/Transfer Fee Actual Costs/
Time and
Materials1
b.c. Resale Fee 0.5% Purchase
Price
c.d. Exercise City Option to Purchase 3% Maximum
restricted resale
price
638
28 Affordable Rental Housing
a. Loan and Agreement Modification Fee Actual Costs/
Time and
Materials1
b. Subordination Fee Actual Costs/
Time and
Materials1
c. Monitoring Fee Per Unit $50
d. Resale Fee Actual Costs/
Time and
Materials1
e. Legal Fee Per
Transaction
Actual Costs
1Costs may include but are not limited to: hourly rate for staff time, recording fees, title reports, appraisals, and public noticing costs. Hourly rate may vary by department, but the hourly rate for Housing staff is $199158.28.
639
29 Engineering and Transportation Services
A. AIRPORT SERVICES
1. Monthly and Daily Fees for Aircraft Parking and Storage.
Waiting List Application Refundable Deposit of $200300.00
a. Hangar Space Monthly Charges
(1) Small T-Hangars $319.00
(2) Standard T-Hangars $494.00
(3) Large T-Hangars $614.00
(4) Small Executive Hangar $1,065.00
(5) Standard Executive Hangars $1,475.00
(6) Large Executive Hangars $1,609.00
b. Hanger Storage Rooms Monthly Charges
(1) Small $79.00
(2) Medium $110.00
(3) Large $213.00
(4) Extra Large $271.00
(5) Office Spaces $706.00
c. Tie Downs (Aircraft Gross Weight/Wing Span)
(1) Single Engine 3,500 lb. and Single Engine Helicopters $65.00 (2) Twin Engine 12,500 lb. less than 50 ft and Twin Engine Helicopters
$75.00
(3) 12,501 - 25,000 lb. more than 50 ft $108.00
(4) 25,001 - 75,000 lb. $161.00
(5) Excess of 75,000 lbs. $216.00
d. Transient Overnight Tie Downs (Aircraft Gross Weight/Wing Span) First Four (4) Hours Free
Single Engine 3,500 lb. and Single Engine Helicopters
Daily Charge
(1) Single Engine 3,500 lb. less than 40 ft% $6.00
(2) Twin Engine 12,500 lb. less than 50 ft and all Helicopters $8.00 (3) 12,501 - 25,000 lb. more than 50 ft $12.00
(4) 25,001 - 75,000 lb. $23.00
(5) Excess of 75,000 lbs. $29.00
(6) Lighter-than air Airships $20.00
e. Effective July 1, 1997, a late charge of $15.00 or 5% of the monthly rent per month, 640
30 whichever is greater, shall be assessed if rent is not paid within ten (10) days of its due date (does not apply to daily rent).
f. Effective July 1, 1997, if the service of a member firm of the California Association of Photocopies and Process Servers must be utilized, a $50 fee shall be charged to the individual or business necessitating said process service. g. The City shall charge a fee equal to the sum of the following: Five cents for each gallon of petroleum products delivered during the previous calendar month from the Leased Premises, or an amount equal to 3 percent of the gross receipts (including fuel and gasoline taxes for which Lessee sold fuel products during the previous calendar month on or from the Airport, whichever amount is greater.
h. All month-to-month Airport leases shall include a security deposit equal to one month’s rent.
2. Permits
Monthly Charges
a. Airport Annual Business Permit $150126.00
b. Taxiway Access Permit $786.00
3. Airport Land Values
Airport Land Value is on file in the Airport Administration Office and available for review
4. Gate Access Cards
a. Initial Issue for Airport Tenants Free
b. Initial Issue for non-direct Airport Tenants $4743.00 c. Replacement $4743.00
5. Hangar Padlock Keys
a. Duplicate Key $2112.00
b. Padlock Replacement $133126.00
6. Chocks and Chains Replacement $7963.00
7. Landing Fee
Commercial aircraft operations (shall include landings of all non-based general aviation aircraft that conduct air taxi, charter, or cargo operations under FAR Part 121 or Part 135) based on maximum certificated gross landing weight:
Per Landing Daily Monthly
0 – 3,500 pounds $2 $5 $13
3,501 – 6,250 pounds $4 $10 $26
6,251 – 12,500 pounds $8 $20 $52
12,501 – 25,000 pounds $16 $40 $104
25,001 – 50,000 pounds $32 $80 $208
50,001 pounds and above $64 $160 $416
8. Hangar Exchange
a. Administration Fee for Exchange between Tenants (each Tenant) $10089.00 641
31 b. Administration Fee for Exchange into Vacant Hangar $10089.00
9. Tie Down Exchange
a. Administration Fee to Exchange tie-down spaces $7052.00
10. Vacated Hangar Cleanup
a. Cleanup and disposal of items, minimum charge of 2 hours (per person) $250174.00 b. Additional hours, hourly rate $10087.00
11. Ramp Sweeping Services, hourly rate $238.00/hour
*Ramp Sweeping Services do not include staff time
12. Maintenance Staff Service Charge per hour $10087.00 plus materials
13. Airport Administration Building Meeting Room
a. Non-profit Aviation organization charging no fee to the public No Charge b. For-profit Aviation organization charging a fee to the public $200.00/day
14. Airport Project Administration Fee $5,000.00
15. Commercial Operator/Fixed Base Operator Waste Oil Fee $1.00/per qt.
B. ENGINEERING SERVICES
1. Publication
a. Standard Detail $20.00
b. “No Parking” Signs $29.00
c. Copy and print full size prints (24x36) first 10 pages (fee is per page) $10.00 d. Copy and print full size prints (24x36) first 11+ pages (fee is per page) $8.00
2. Survey
a. Curb and gutter skating; after 100 linear ft. $870.00 b. Curb and gutter skating; after 100 linear ft. – each additional 50 linear ft.
$420.00
c. Grade calculation s and cut sheets per location $420.00 d. Form checking up to 100 linear ft. $840.00
e. Form checking: up to 100 linear ft. – each additional 50 linear ft. $210.00
3.2. Sidewalk Rehabilitation Program
a. Single Family Residential lots $550529.00
b. Multi-family with 1 or 2 damaged locations $550529.00 c. Additional locations
Varies – shall be charged for the exact square footage of the damaged sidewalk repair at the actual Construction Contract bid price $529.00
4. Major Street Improvement Plan Review $3,027.00
(Deposit – T&M)
642
32 5.3. Encroachment Permit Application – Minor Work $374.00327 plus Public Works
inspection fee
a. Concrete
(1) Curb, gutter, and/or sidewalk (including driveway) First 100 linear ft.
$595496.00
(2) Each additional 100 linear feet or fraction thereof $465386.00 (3) Driveway, handicapped ramp, curb return $430360.00
(4) Planter strip fill (each property) $215180.00
b. Drainage
(1) Drainage system and appurtenance, first 100 linear ft. $975811.00 (2) Each additional 100 linear ft. or fraction thereof, up to a maximum total of 500 linear ft.
$765637.00
(3) Drainage tie-in to existing structures $765637.00
(4) Non-standard structures (other than above) $975811.00 (5) Manholes, vaults, area drains, storm water inlets other standard structures
$975811.00
(6) Storm Water Interceptors $975811.00
c. Street Work & Miscellaneous
(1) Street trenches or bores up to 100 linear ft. $765637.00 (2) Each additional 100 linear ft. or fraction thereof, up to a maximum total of 500 linear ft.
$555463.00
(3) Street cuts, other, up to 100 square ft. $765637.00 (4) Each additional 100 sq. ft. or fraction thereof $555463.00 (5) Temporary placement of Debris Box or Storage Container within public right-of-way. (cost per month)
$196405.00
(6) Street micro trench up to 500 linear ft. $4,8754,251.00 (7) Street bores or any trenchless work up to 500 linear ft. $4,8754,251.00 (8) Sidewalk area obstruction fee, first week only $1,040868.00 a. Sidewalk area obstruction fee, each additional week or fraction thereof
$205172.00
(9) Temporary lane closure only (no construction), first week only $380315.00 a. Temporary lane closure only (no construction), each additional week or fraction thereof
$205172.00
d. Monitoring well inspection and plan review
(1) First well
a. Inspection $537496.00
b. Plan review $374630.00
(2) Each additional well within the same general location 643
33 a. Inspection $250224.00
e. Utility Services – New or Repaired
(1) Each new or replaced utility pole location, guy wire, etc. $555463.00 (2) Each utility service connection in sidewalk or street (gas electric, telephone, etc.)
$635531.00
f. Sanitary Sewers
(1) Sanitary Sewer Laterals
a. From main in street to easement to building up to 100 linear ft. $975811.00 b. Each additional 100 linear ft. or fraction thereof $555463.00 c. Add for monitoring structure if required $975811.00
d. From existing stub at right-of-way to building up to 100 linear ft.
$765637.00
e. Each additional 100 linear feet or fraction thereof $555463.00 f. Each building sewer repair or replacement
(i) In public right-of-way, complete $975811.00
(ii) In private property (no street evacuation) $765637.00 (2) Sanitary Sewer Building Court Mains
a. Each building court main when plan, profile, and cut sheet are required, initial
$975811.00
b. Each additional 100 ft. or fraction thereof $555463.00 c. Each building court main when plan only is required for Initial 100 ft. or less
$725603.00
d. Each additional 100 feet or fraction thereof $465386.00 g. Additional Inspections $405.00
For any public works encroachment permit on which an unreasonable number of inspections are required, an additional fee per inspection will be charged for each inspection over and above the number deemed reasonable by the City Engineer.
h. Additional Inspections After Hours $215.00
h.i. Permit Amendment Fee (extensions for expired permit, additional permits not originally obtained, etc.)
$187157.00 (per
occurrence)
i.j. Traffic Control Plan Review $216.00180.00
a. For additional sheets over 6 pages $10890.00
j.k. Survey
a. Curb and gutter skating; after 100 linear ft. $889870.00 b. Curb and gutter skating; after 100 linear ft. – each additional 50 linear ft.
$431420.00
c. Grade calculations and cut sheets per location $431420.00 644
34 d. Form checking up to 100 linear ft. $863840.00
e. Form checking: up toafter 100 linear ft. – each additional 50 linear ft.
$215210.00
f. Survey Monument Preservation Review $50.00
6.4. Encroachment Permit Application – Major Work (road closures, traffic control, more than 500 linear ft. of work, etc.) $4,000.00
(Deposit – T&M)
a. Construction Inspection, Technical Support, & Project Closeout for Trenchless Construction5% of Construction Cost prior to permit issuance
$5% of
construction cost
prior to permit
issuance.
7.5. Development Plan Review
a. Parcel Map Application $5,000.00
(Deposit – T&M)
b. Final Map Application $15,000.00
(Deposit – T&M)
c. Grading Permit Application $4,000.00
(Deposit – T&M)
d. Geological Investigation and Report Peer Review $4,000.00 (Deposit – T&M)
e. Floodplain (Special Flood Hazard Area - SFHA) Development (Fill/Grading) – Hydrologic & Hydraulic (H&H) Engineering Peer Review $4,000.00
(Deposit – T&M)
e.f. Construction Inspection 3% of Imp. Cost
(Deposit –
T&M)5% on any
amt below
$500,000
4% on any amt
above $500,000
8.6. Penalties
Failure to comply with this notice will result in further enforcement action by the Code Enforcement Division including, but not limited to; additional permit, inspection and penalty fees, and/or other available legal remedies.
a. Public Works penalty for work in public right-of-way or grading without a permit
$2,000.00
b. Code violation illegal project, penalty fee may be applied daily $125.00 c. Code Enforcement Investigation fees for permit not yet obtained $2,000.00
9.7. Dig‐Once Policy
a. Engineering Plan Review $2,500.00
(Deposit – T&M)
b. Moratorium Override Request Fee $5,000.00
(Deposit – T&M)
10.8. Section 7‐4 Wireless Communication Facilities
645
35 a. Wireless Communication Facilities in the Public Right of Way (WCF PROW)
(1) WCF PROW Permit Application Fee $2,000.00
(Deposit – T&M)
(2) Renewal Fee 100% of
Application Fee
(3) Appeal Fee $400.00
(4) Application Pre-Submittal Review Fee No Charge
b. Small Cell Master License Agreement (MLA)
(1) MLA Processing $4,000.00
(2) Pole License Administrative Fee $2,500.00
(3) Annual Lease Charge for Use of City Poles $295.04*
$303.89**
*$295.04 Effective January 14, 2026
**$303.89 Effective January 14, 2027
11.9. Traffic Impact Fee
a. Residential
(1) Single-Family Resident/Unit $3,9223,936/unit
(2) Townhome/Unit $3,9223,936/unit
(3) Multi-Family/Unit $0/unit
b. Non-Residential
(1) Retail/KSF $0/KSF
(2) Office/KSF $0/KFS
(3) General Industrial/KSF $3,6613, 674 /KSF
(4) Distribution or e-commerce/KSF $6,4996,522 /KSF
c. Appeal Fee. $451453.00
d. Annual Adjustment
The traffic impact fees listed above shall be automatically adjusted on the first of the fiscal year based on the preceding calendar year average California Cost Index (CCI) for the San Francisco Bay Area as produced by the Engineering News Record (ENR).
646
36 Finance
A. OPERATING PERMITS
1. Bingo Permit (Reference HMC 4-3)
a. Initial or Renewal Fee $6961.00
2. Card Club Permit (Reference HMC 4-3)
a. Application Fee $122106.00
b. Annual Table Fee $18,46716,511
Per Table
3. Closeout Sale Permit (Reference HMC 6-4)
a. Initial Fee $4540.00
b. Renewal $4540.00
4. Cabarets and Dance Licenses and Permits (Reference HMC 6-2) a. Annual License (payable quarterly in advance) $692619.00
Per Year
b. Single Event Permit $461412.00
5. Preferential Parking Permit (Reference Hayward Traffic Regulations Section 3.95 and Hayward Traffic Code 6.36)
a. Initial Fee and Biennial Renewal Fee (for first residential or visitor permit)
$6050.00
b. Each additional residential permit $3025.00
c. Each additional visitor permit $3025.00
d. Permit Replacement fee $3025.00
6. Peep Show Permit (Reference HMC 6-9)
a. Peep Show Device Time & Material
b. Investigation Fee Time & Material
a. Tobacco Retailer License (Reference HMC 10-1.2780)
a. Initial or renewal Fee $773.00
B. MISCELLANEOUS FEES
1. Monthly Listing of New Hayward Based Businesses $1817.00 Per Month
2. Business Verification/Ownership Research $3029.00
Per Business
3. Parking Tax Offset Fee $2.50
4. Online Credit/Debit Card Payment Transaction Fee $3.95
4.5. Business License Application Fee $29.0027.00
Per Application
647
37 5.6. Business License Technology Fee $10.00
Per Business
6.7. Chargeback/Returned Payment Fee $25 .00 for
first/$35.00 after
7. Credit/Debit Card Service Fee Not to exceed 4%
for transactions
over $300.00
648
38 Fire Department
A. FIRE PREVENTION
Standard Hourly Rate Per Hour $318262.00
OVERTIME (AFTERHOUR INSPECTION 2 hour minimum) Per Hour $478394.00 Expedited Plan Review (2 hour minimum) Per Hour $478394.00
New Fire Sprinkler Systems PLUS Hydraulic Calculation Fee* (See Below) 1-29 Heads Per Floor or System $2,2321,839.00
30-100 Heads Per Floor or System $2,7102, 233.00
101-200 Heads Per Floor or System $3,0292,496.00
201-350 Heads Per Floor or System $3,5082,891.00
351+ Heads Per Floor or System $4,3053,548.00
Fire Sprinkler —Tenant Improvements (PLUS Hydraulic Calculation Fee*, if applicable) LESS THAN 30 HEADS W/ NO HYDRO - Minor plan check
required – only one inspection
$956788.00
LESS THAN 30 HEADS WITH HYDRO - Minor plan check
required – only one inspection
$1,2751,051.00
Minor plan check required-only one inspection
30-100 Heads Per Floor or System $2,3912,710.00
101-200 Heads Per Floor or System $3,0292,496.00
201-350 Heads Per Floor or System $3,5082,891.00
351+ Heads Per Floor or System $4,3053,548.00
Tract Review – Fire Sprinkler Master Plan Check PLUS Hydraulic Calculation Fee* Duplicate TRACT Plan Check 13D SYSTEM
(SFD/TOWNHOUSE)
Per Floor or System $1,2751,051.00
Duplicate TRACT Plan Check 13 SYSTEM (BUILDING) - 200
Heads and Below
Per Floor or System $1,5941,314.00
Duplicate TRACT Plan Check 13 SYSTEM (BUILDING) - 201
– 350 Heads
Per Floor or System $1,9131,576.00
Duplicate TRACT Plan Check 13 SYSTEM (BUILDING) - 351+
Heads
Per Floor or System $2,2321,839.00
Additional Fire Sprinkler Review Items
Hydraulic Calculation* Per Remote Area $1,2751, 051.00
Antifreeze System Per System $2,3911,971.00
Dry Pipe Valve Per Valve $2,5512,102.00
649
39 Deluge/Pre Action Per Valve $3,0292,496.00
Pressure Reducing Station Per Valve $3,5082,891.00
Fire Pump Per Pump $4,1453,416.00
Water Storage Tank
Gravity Per Tank $2,3911,971.00
Pressure Per Tank $2,3911,971.00
Fire Standpipe System
Class I, II, III & Article 81 Per Standpipe $2,8702,365.00
Fire Alarm System ‐New
0-15 Devices* Per System $1,5941,314.00
16-50 Devices Per System $2,2321,839.00
51-100 Devices Per System $2,8702,365.00
101-500 Devices Per System $3,5082,891.00
Each additional 25 devices up to 1,000 Per System $1,5941,314.00 1001+ Per System $6,3785,256.00
Each additional 100 devices Per System $3,1892,628.00
*Devices=All Initiating and indicating appliances, including Dampers Existing system under 8 devices $956788.00
Additional Fire Alarm Review Items
Hi/Lo Alarms Each $1,7541,445.00
Low Air/Temp Alarms Each $1,7541,445.00
Graphic Annunciator Review Each $1,7541,445.00
Hazardous Activities or Uses
Installation Permits
Clean Agent Gas Systems $1,7541,445.00
Dry Chemical Systems $1,7541,445.00
Wet Chemical/Kitchen Hood $1,7541,445.00
Foam Systems $1,7541,445.00
Paint Spray Booth $1,7541,445.00
Vehicle Access Gate $797657.00
Monitoring $956788.00
Aboveground—Flammable/Combustible Liquid Tank
and/or Pipe
$1,5941,314.00
650
40 Underground—Flammable/Combustible Liquid Tank
and/or Pipe
$1,5941,314.00
Fuel Dispensing System Complete $1,7541,445.00
High Piled/Rack/Shelf Storage $2,0721,708.00
Smoke Control CFC $2,0721,708.00
Medical Gas Alarms $1,7541,445.00
Refrigerant System $1,5941, 314.00
Refrigerant Monitoring System $1,7541,445.00
AMMR Review
Activity Permits (Single Event/One-Time) Each $956788.00 Open Flames and Candles Per Permit $1,275.00
Carnivals and Fairs Per Permit $1,5941, 314.00
Seasonal Lots (Christmas Tree/Pumpkin Lot) Per Permit $318262.00 Special Events (Haunted House/Camps) Per Permit $318262.00 Explosives Per Permit $1,5941,314.00
Fireworks; Displays Per Permit $1,5941,314.00
Hot-Works Operations Per Permit $1,2751, 051.00
LP-Gas Per Permit $1,594.00
Liquid or Gas-Fueled Vehicles or Equipment in Per Permit $1,594314.00 Assembly Buildings
(1) Covered Mall Buildings Per Permit $1,5941,314.00
(2) Open Burning Per Permit $1,5941,314.00
Pyrotechnical Special Effects Material Per Permit $1,5941,314.00 Temporary Membrane Structures, Tents and Canopies (105.5.49)
(1) Small Tent Structure (750 Sq. Ft. or less) Per Permit $797657.00 (2) Large Tent Structure (751 Sq. Ft. or above) Per Permit $956758.00 (3) Fire Safety Inspections Per Application $1,2751,051.00 (4) Non-Compliance Inspections Per Inspection $1,2751,051.00 (5) Outside Agency Per Inspection $1,2751,051.00
Facility Inspections
Annual State-Mandated Pre-Inspections (6 or less
Occupants)
Per Facility $262.82
Annual State-Mandated Pre-Inspections (7 or more
Occupants)
Per Facility $394.23
651
41 Apartments
Small Apartments (3-15 units) Per Facility $262.82
Medium Apartments (16-100) units More Per Facility $1,2751,051.00 Large Apartments ( >100 units) Per Facility $1,5941,314.00 24 Hour Community Care Facilities Per Facility
7 to 49 Per Facility 525.64
50 or more Per Facility $1,2751,051.00
Day Care Centers
Residential 9-14 Per Facility $318.262. 00
Commercial 15+ Per Facility $637525.00
High Rise Building Per Facility $1,9131,576.00
Homes for the Mentally Impaired (7 or more Occupants) Per Facility $1,2751,051.00 Hospital and Jail Per Facility $2,8702,365.00
Hotels/Motels Per Facility $1,2751,051.00
School Per Facility $1,4351,182.00
Reports Per Facility
Life Safety Report Per Report $0.50/page for
first ten (10)
pages of Each
document $0.10
Each additional
page of same
document
Life Safety Report Photographs Per Photograph Direct cost of duplication
Subpoenaed Reports Per Report $0.50/page for
first ten (10)
pages of Each
document $0.10
Each additional
page of same
document
Other Fire Fees
Underground Fire Service Plan Check Each $2,8702,365.00 Emergency Underground Repair Each $956788.00
Hydrant Flow Test (existing Hydrants) Each $1,116919.00 Fire Plans Examiner Miscellaneous eachEach $478394.00
Re-Inspection Fee
Fire Prevention Office “No Show” for Inspection
Appointment Fee
Per Hour
Each
$558459.00
$318.00
652
42 False Alarm Response* Per Billed Incident $1,4351,182.00 Fire Hydrants Per Hydrant $318262.00
Re-roofing Permits /Siding/Windows (Applicable only in
Wildland/Urban Interface)
Per Application $159131.00
Fire Permit Extension Fee Per 6-Month
Extension
$15931.00
Cannabis Facilities Per Year $1,2751,051.00
Pre-Application/General Plan Review/Code Assistance Per Meeting $1,5941,314.00 Planning/Engineering Referrals (HWD) Per Application $1,2751,051.00 Business License Reviews Each $1,1161,919.00
Fairview Planning Referrals Each $478394.00
Fairview New Construction Per Application $1,4351,182.00
Annual Permits
Additive Manufacturing (3D Printing) (105.5.1) Per Year $1,275.00 1,051.00
Aerosol Products (105.5.2)) Per Year $1,594.00
1,314.00
Amusement Buildings (105.5.3) Per Year $1,275.00
1,051.00
Aviation Facilities (105.5.4) Per Year $1,275.00
1,051.00
Carnivals and Fairs (105.5.5) Per Year $1,275.00
$1,051.00
Cellulose Nitrate Film (105.5.6) Per Year $1,275.00
$1,051.00
Combustible Dust-Producing Operations (105.5.7) Per Year $1,275.00 $1,051.00
Combustible Fibers (105.5.8) Per Year $1,275.00
$1,051.00
Compressed Gases (105.5.9) Per Year $1,275.00
$1,051.00
Covered Mall Buildings (105.5.10) Per Year $3,508.00
2,891.00
Cryogenic Fluids (105.5.11) Per Year $1,275.00
$1,051.00
Cutting and Welding (105.5.12) Per Year $1,275.00
$1,051.00
Dry Cleaning Plants (105.5.13) Per Year $1,275.00
$1,051.00
Energy Storage Systems (105.5.14) Per Year $1,275.00
653
43 $1,051.00
Exhibits and Trade Shows (105.5.15) Per Year $1,275.00
$1,051.00
Explosives (105.5.16) Per Year $1,275.00
$1,051.00
Fire Hydrants and Valves (105.5.17) Per Year $1,275.00
$1,051.00
Flammable and Combustible Liquids (105.5.18) Per Year $1,275.00 $1,051.00
Fruit and Crop Ripening (105.5.20) Per Year $1,275.00
$1,051.00
Fumigation or Thermal Insecticide Fogging (105.5.21) Per Year $1,275.00 $1,051.00
Hazardous Materials (105.5.22) Per Year $1,275.00
$1,051.00
HPM facilities (105.5.23) Per Year $1,594.00
1,314.00
High-Piled Storage < 12000 SF (105.5.24) Per Year $1,275.00 1,051.00
High-Piled Storage > 12000 SF (105.5.24) Per Year $1,594.00 1,314.00
Hot-Works Operations (105.5.25) Per Year $1,275.00
1,051.00
Industrial Ovens (105.5.26) Per Year $1,275.00
$1,051.00
Lumber Yards and Woodworking Plants (105.5.27) Per Year $1,275.00 $1,051.00
Liquid or Gas-Fueled Vehicles or Equipment in Assembly
Buildings (105.5.28)
Per Year $1,275.00
$1,051.00
LP-Gas (105.5.29) Per Year $1,275.00
$1,051.00
Magnesium (105.5.30) Per Year $1,275.00
$1,051.00
Miscellaneous Combustible Storage (105.5.31) Per Year $1,275.00 $1,051.00
Mobile Fueling of Hydrogen-Fueled Vehicles (105.5.32) Per Year $1,275.00 $1,051.00
Motor fuel-dispensing facilities (105.5.33) Per Year $1,275.00 $1,051.00
Open Burning (105.5.34) Per Year $1,275.00
$1,051.00
Open Flames and Torches (105.5.35) Per Year $1,275.00
654
44 $1,051.00
Open Flames and Candles (105.5.36) Per Year $1,275.00
$1,051.00
Organic Coatings (105.5.37) Per Year $1,275.00
$1,051.00
Outdoor assembly event (105.5.38) Per Year $1,275.00
$1,051.00
Places of Assembly < 300 (105.5.39) Per Year $1,275.00
$1,051.00
Places of Assembly > 300 (1055.39) Per Year $1,594.00
1,314.00
Plant extraction systems (105.5.40) Per Year $1,275.00
$1,051.00
Private Fire Hydrants (105.5.41) Per Year $1,275.00
$1,051.00
Pyrotechnical Special Effects Material (105.5.42) Per Year $1,275.00 $1,051.00
Pyroxylin Plastics (105.5.43) Per Year $1,275.00
$1,051.00
Refrigeration Equipment (105.5.44) Per Year $1,275.00
$1,051.00
Repair Garages and Motor Fuel-Dispensing Facilities
(105.5.45)
Per Year $1,275.00
$1,051.00
Rooftop Heliports (105.5.46) Per Year $1,275.00
$1,051.00
Spraying or Dipping (105.5.47) Per Year $1,275.00
$1,051.00
Storage of Scrap Tires and Tire Byproducts (105.5.48) Per Year $1,275.00 $1,051.00
Technology Fee Per Year 6% of annual
permit fee
Tire-Rebuilding Plants (105.5.50) Per Year $1,275.00
$1,051.00
Waste Handling (105.5.51) Per Year $1,275.00
$1,051.00
Wood Products (105.5.52) Per Year $1,275.00
$1,051.00
Lithium Batteries (105.5.53) Per Year $1,275.00
$1,051.00
Additional Permits (105.5.54) Per Year $1,275.00
$1,051.00
Essential City Facilities Per Year $1,275.00
655
45 $1,051.00
Miscellaneous Fees ‐ Building Permits
Minor Tenant Improvement Per Permit $956788.00
Revision-minor changes to (E) permit Per Permit $478394.00 Cellular Sites
Existing Site Per Permit $956788.00
New Site Per Square
Footage
VARIABLE - SEE
CHART
Equipment Installations Per Permit $956788.00
HVAC/air units
If over 2,000 cfm Per Permit $318262.00
B. HAZARDOUS MATERIALS OFFICE
Annual Certified Unified Program Agency (CUPA) Program Permit and Registration Fees
1. Hazardous Materials Storage Permit
Annual permit per facility for storage and/or handling of hazardous materials as defined in Hayward Municipal Code, Chapter 3, Article 8. 1A Storage of one (1) or more types $381.00 Per Year
Solid - up to 500 pounds
Liquid - up to 55 gallons
Gaseous - up to 2,000 cubic feet at STP
2A Storage of one (1) or more types $397255.00 Per
Year
Solid - over 500 & up to 5,000 pounds
Liquid - over 55 & up to 550 gallons
Gaseous - over 200 & up to 2,000 cubic feet at STP
3A Storage of one (1) to five 5) types $413269.00 Per
Year
Solid - over 5,000 & up to 25,000
pounds Liquid - over
550 & up to 2,750 gallons
Gaseous - over 2,000 & up to 10,000 cubic feet at STP
3B Storage of six (6) or more types $447298.00 Per
Year
Solid - over 5,000 & up to 25,000
pounds
Liquid - over 550 & up to 2,750 gallons
Gaseous - over 2,000 & up to 10,000 cubic feet at STP
656
46 4A Storage of one (1) to five (5) types $462312.00 Per Year
Solid - over 25,000 & up to 50,000
pounds
Liquid - over 2,750 & up to 5,000
gallons
Gaseous - over 10,000 & up to 20,000 cubic feet at
STP
4B Storage of six (6) or more types $480326.00 Per
Year
Solid - over 25,000 & up to 50,000
pounds
Liquid - over 2,750 & up to 5,000
gallons
Gaseous - over 10,000 & up to 20,000 cubic feet at
STP
5A Storage of one (1) to five (5) types $530369.00 Per Year
Solid - over 50,000 pounds Liquid -
over 5,000 gallons
Gaseous - over 20,000 cubic feet at STP
5B Storage of six (6) to ten (10) types $580411.00 Per Year
Solid - over 50,000 pounds Liquid -
over 5,000 gallons
Gaseous - over 20,000 cubic feet at STP
5C Storage of eleven (11) or more types $596426.00 Per Year
Solid - over 50,000 pounds Liquid -
over 5,000 gallons
Gaseous - over 20,000 cubic feet at STP
2. Hazardous Waste Generator Program
Conditionally Exempt Small Quantity Generator
(CESQG) – Up to an including 100 kilograms per
month (approximately up to and including 27
gallons or 220 pounds per month) or less than or
equal to 1 kilogram of acutely hazardous waste
per month
The category that was the basis for this
fee has been eliminated by the State
and combined with Hazardous Waste -
SQG.$184.00peryear
a. Small Quantity Generator (SQG) – Less than 1000
kilograms (approximately 270 gallons or 2200
pounds) per month. Less than 1 kilogram of
acutely/extremely hazardous waste per
monthSmall Quantity Generator (SQG) – Over 100
kilograms up to and including 1000 kilograms per
month (approximately over 27 gallons up to and
including 270 gallons or over 220 pounds up to
and including 2,220 pounds per month)
$397340.00 Per
Year
657
47 b. Large Quantity Generator (LQG) – 1000 kilograms
or more per month (approximately 270 gallons or
2200 pounds) or 1 kilogram or more of
acutely/extremely hazardous waste per
monthLarge Quantity Generator (LQG) – Greater
than 1000 kilograms per month (approximately
over 270 gallons or 2,220 pounds per month) or
greater than 1 kilogram of acutely hazardous
waste per month
$529454.00 Per
Year
3. Hazardous Waste Treatment (Tiered Permit) Program
a. Permit by Rule (Fixed Units) Per Year $529454.00 Per Facility
b. Permit by Rule (Transportable units) Per Year $529454.00 Per Facility
c. Conditional Authorization Per Year $298255.00 Per
Facility
d. Conditional Exemption, Specified Waste Per Year $264227.00 Per Facility
e. Conditional Exemption, Small Quantity Treatment Per Year $264227.00 Per Facility
f. Conditional Exemption, Commercial Laundry Per Year $264872.00 Per Facility
g. Conditional Exemption, Limited Per Year $264872.00 Per Facility
4. Hazardous Materials Business Plan (HMBP) Per Year $397255.00 Per Facility
5. Underground Storage Tank (UST) Program Per Year $1,4901,278.00 for 1st UST per year
$553.00 per add’l
UST per year
6. Underground Storage Tank (UST) Program per
Additional UST
$645533.00
Per Facility
7. Aboveground Petroleum Storage Act Program (APSA) –
Spill Prevention Control and Countermeasure Plan
(SPCC) – Qualified: Greater than 1,320 gallons but not
more than 10,000 gallons stored at facility per year.
Per Year $365.00 Per
Facility
7.8. Aboveground Petroleum Storage Act Program (APSA) - Spill Prevention Control and Countermeasure Plan
(SPCC) - Non-Qualified: 10,000 gallons or greater stored at the facility per year.
Per Year $463 397Per
Facility
Spill Prevention Control and Countermeasure Plan
(SPCC)
per
yea
r
$39
7.00 per
facil
ity
8.9. California Accidental Release Prevention (CalARP)
658
48 Program
a. Small CalARP facility Per Year $3,0792,642.00
Per Facility
b. Large CalARP facility Per Year $3,17922,727.00
Per Facility
9.10. Annual State Surcharges*
a. CUPA Program Oversight Current State Fee*
b. Underground Storage Tanks (UST) Program
Current State Fee*
Current State Fee*
c. CalARP Program Fee* Current State Fee*
d. California Electronic Reporting System (CERS)
Fee*
Current State Fee*
e. Above-ground Petroleum Storage Act (APSA) Fee* Current State Fee* *These fees are established through a regular fee adoption process by the State of California and are required to be collected at the current State of California rate by the Hayward Fire Department’s Certified Unified Program Agency (CUPA). The fees are then required to be remitted by the City of Hayward Fire Department to the State of California on a quarterly basis. The fees are set by the State of California per Title 27 California Code of Regulations Section 15240.
10.11. Technology Fee 6% of annual
permit fee
New Construction Permits and Fees
1. New Construction
a. Large, Tenant Improvement – New Facility $4,768.004,090.00 b. Medium, Tenant Improvement – New Facility $3,129.002,684.00 c. Small, Tenant Improvement – New Facility $1,589.001,363.00 d. Extra Small, Tenant Improvement – New Facility $794.00681.00
2. New Facility – No Construction
a. Medium to Large $2,384.002,045.00
b. Small $1,192.001,022.00
3. Underground Storage Tank
a. System Installation – VPH* up to 3 tanks $5,017.004,303.00 System Installation – VPH” each tank over 3 tanks $1,672.001,434.00 b. Piping Installation $1,738.001, 491.00
c. Piping Installation – VPH* $2,136.001,832.00
d. UDC/Sump Installation $1,738.001,491.00
e. UDC/Sump Installation – VPH* $2,136.001,832.00
f. System Removal up to 3 tanks $2,185.001,874.00
System Removal each tank over 3 tanks $728.00624.00
659
49 g. Piping Removal $1,390.001,193.00
h. UDC/Sump Removal $1,390.001,193.00
i. EVR Phase I Installation or Upgrade $794.00681.00
j. EVR Phase II Installation or Upgrade $1,440.001,235.00 k. Monitoring System Installation or Upgrade $1,291.001,107.00 l. System Tank/Piping Repair $2,285.001,906.00
m. System Tank/Piping Repair – VPH* $2,682.002,301.00
n. System Miscellaneous Component Repair - Major $2,285.001,960.00 o. System Miscellaneous Component Repair – Major–
VPH*
$2,682.002,301.00
p. System Miscellaneous Component Repair – Minor
(Including Monitoring System (“Cold Starts”)
$943.00809.00
q. System Miscellaneous Component Repair – Minor –
VPH* (Including Monitoring System (“Cold Starts”)
$1,341.001,150.00
r. Spill Bucket/Overfill Protection Replacement $1,589.001,363.00
s. Temporary Closure
*VPH – Vacuum, Pressure, and Hydrostatic
Continuously Monitored Systems
$1,788.001,534.00
4. Aboveground Storage Tanks
a. System Installation $1,490.001,278.00
b. System Removal $1,291.001,107.00
c. System Repair or Modification $1,142.00980.00
5. California Accidental Release Prevention (CalARP)
Program
a. Large - Risk Management Plan Review $8,544.007,329.00 b. Small - Risk Management Plan Review $5,364.004,602.00 c. Other costs incurred, including but not limited to
third- party review, laboratory work, public notice,
communication and correspondence
$198.00170.00 per
hour or cost
6. Meetings
a. Code Assistance Meeting $496.00426.00
b. Pre-Application Meeting $397.00340.00
7. Request for Alternate Means of Protection (AMP) $681.00 a. Review $794.00681.00
Miscellaneous Fees
1. Annual Permit Fee
2. Operational Permits - Mobile Fueling Operations
Per Year $198
660
50 a. Initial Permit and Verification Inspection Per Site $794.00681.00 b. Annual Permit Fee Per Year $198.00170.00
3. Facility Closures
a. 3A and above – full facility closure $2,185.001,874.00 b. 3A and above – partial facility closure $1,241.001,065.00 c. Below 3A – full facility closure $745.00639.00
d. Below 3A – partial facility closure $496.00426.00
4. Contamination
a. Staff oversight Per Hour $198.00170.00
5. Site Clearance
a. New construction/use – large $496.00426.00
b. New construction/use – small $298.00255.00
c. Property transfer – large $496.00426.00
d. Property transfer – small $298.00255.00
6. Other Inspections and Compliance Verification
a. Re-inspection (CUPA and non-CUPA) Per Hour $198.00170.00 b. Re-inspection beyond allowed by permit Per Insp. $397.00340.00 c. After-hours inspection Per Hour $298.00255.00
d. Miscellaneous Inspections and Activities Per Hour $198.00170.00 e. Compliance verification Per Notice $99.00
Compliance verification
e.f. HazMat Office “No Show” for Inspection
Appointment Fee
Each
$99.0085.00
$198.00
7. Plan Review/Checking Fees – General
a. Planning Review Fee Per Hour $198.00170.00
b. Plan Checking Fee Per Insp. $198.00170.00
c. Expedited Plan Checking Fee (two hours minimum) Per Hour $298.00255.00
8. California Environmental Reporting System
a. Assistance Fee Per Hour $198.00170.00
b. Assistance Fee (after hours) Per Hour $298.00255.00
9. Non-Compliance FineFee Per Hour $596.00511.00
C. FIRE STATION 6 REGIONAL TRAINING CENTER RENTAL FEES
a. Classroom – EMS (Capacity #) Per Day $350.00
b. Classroom - Fire2 (Capacity 24) Per Day $350.00
661
51 c. Classroom – Fire Simulator (Capacity #) Per Day $650.00 d. HazMat Simulator Per Day $480.00
e. Pump Pit Per Day $250.00
f. Class A Victorian Per Day $480.00
g. Outdoor Classroom Per Day $350.00
h. BART Rescue Prop Per Day $500.00
i. Fire Tower (Full Building) Per Day $1,500.00
j. Full Facility Rental Per Day $1,800.00
k. Transportation Training Prop Per Day $500.00
l. Vehicle Extrication Per Day $480.00
662
52 Information Technology
Video Technician
Video services, including editing and duplication, provided for events
Per Hour $184150.00
GIS Map Printing Per Hour $244188.00
663
53 Library and Community Services
A. GENERAL SCHEDULE OF CHARGES:
1. Item Replacement Fees
a. Print material, videotapes and sound recordings Original cost of item plus processing fee b. DVD’s Original cost of item plus processing fee
c. Reference materials (return within 7 days) Original cost of item plus processing fee d. Processing fee $96.00
e. Board Games Up to $54.99 Each
2. Printing/Copying Fees (per page
a. Printing (B&W) $0.15
b. Printing (Color) $0.30
c. Copying (B&W) $0.15
d. Copying (Color) $0.30
3. Replacement of lost library cards (1 free per year) $2.00
4. Replacement lost/damaged bar code or RFID tag $1.00
5. Agenda & Minutes Library Commission $30.00 per year
6. Mailing of library materials Cost of mailing
B. ADMINISTRATIVE SERVICES
1. Community Services Commission Agenda $15.00 Per Year
2. Community Services Commission Minutes $15.00 Per Year
C. MAKERSPACE MATERIALS FEES (21ST CENTURY LIBRARY)
1. Carvey Materials
a. Birch material $3.15 Each
b. 2-color ABS $3.15 Each
c. HDPE $2.50 Each
d. Linoleum $3.00 Each
2. Laser Cutter Materials
a. Birch material $3.75 Each
b. Clear acrylic $3.75 Each
3. Cricut & Scan N Cut Materials
a. Iron-on vinyl $1.25 Per sq. ft.
b. Perm adhesive vinyl $1.25 Each
c. 12” x 12 Cardstock $0.65 Each
d. Transfer tape $0.65 Each
664
54 e. Craft Paper $0.50 Each
4. Wide-format Printer Paper (per page)
a. 11” x 17” matte $0.85
b. 11” x 17” photo $1.35
c. 13” x 19” matte $1.75
d. 13” x 19” photo $3.50
e. 4” x 6” ink only $0.05
f. 5” x 7” ink only $0.07
g. 8.5” x 11” ink only $0.20
h. 11” x 17” ink only $0.35
i. 13” x 19” ink only $0.50
5. 3D Printing
a. Filament $0.05 Per Gram
6. Sublimation
a. 8.5” by 11” Paper + Printed ink or marker $1.25 Each b. Mug blank $3.00 Each
c. Mouse Pad blank $1.50 Each
d. Hat blank $3.00 Each
e. Puzzle blank $1.50 Each
f. Bag-small $1.00 Each
g. Bag-large $1.50 Each
7. Xyron (Create-a-Sticker)
a. Sticker paper $0.10 Per Linear Inch
b. Magnet $0.30 Per Linear Inch
8. Sewing
a. 12” x 12” Fabric $0.75 Each
b. 18” x 22” Fat Quarter $2.50 Each
c. Fusible Interfacing $1.00 Per Linear Foot
9. Button Maker
a. 1.25” button kit $0.10 Each
b. 2.25” button kit $0.20 Each
10. Embroidery
a. Thread $0.10 Per 1000 stitches
b. Stabilizer $0.25 Per sheet
11. Miscellaneous
a. Shrinky Dink $0.50 Per sheet
665
55 b. Perler Project $0.50 per project board
c. Laminate Pouch $0.25 Each
D. LIBRARY OF THINGS
Item LOT Category Actual Cost Fee Schedule
Puzzles LOT Game $16.99 Original cost of item plus processing fee Ukuleles LOT Music $50.00 Original cost of item plus processing fee Binoculars LOT Recreation $59.99 Original cost of item plus processing fee Backpacks (Hiking) LOT Recreation $112.86 Original cost of item plus processing fee Stargazing Kits LOT Recreation $504.38 Original cost of item plus processing fee Trekking Poles LOT Recreation $34.99 Original cost of item plus processing fee SunJack Solar Chargers LOT Technology $79.95 Original cost of item plus processing fee IFixIt Pro Tech Kits LOT Technology $94.94 Original cost of item plus processing fee
E. TECH LENDING LIBRARY FEES
a. Processing Fee $20.00
b. Wifi Connected Chrome Book up to $500
c. Wifi Connected Tablet up to $250
d. Hot Spot up to $400
e. Peripherals up to $25 Each
666
56 Maintenance Services Department
A. CITY HALL RENTALS
USER GROUPS
Users are classified into the following groups for determining scheduling priority and the applicable fees and charges.
a. Individuals living in Hayward
b. Individuals living outside of Hayward
c. Non-profits [501(c) 3,4, or 6] and other public or private civic, cultural, educational, or charitable groups
d. Businesses and other commercial groups
RENTAL RATES:
FEE RATES BY USER GROUP **ALL RATES HOURLY**
Individual Organization
City Hall Facilities Seating Deposit A.
Hayward Resident
B.
Non‐ Hayward
Resident
C.
Non‐ Profit
D.
Commercial
City Hall – Rotunda
(4 hr. min) 160 $300* $121
($920 daily max) $152 $131
($920 daily max) $183
City Hall – Council
Chambers (4 hr. min) 166 $300* $68
($546 daily max) $99 $78
($546 daily max) $131
City Hall – Pre- function
Area 2nd floor (4 hr. min) 100 $300* $57
($462 daily max) $89 $68
($462 daily max) $121
City Hall – Plaza
(4 hr. min) - $500* $73
($588 daily max) $105 $84
($588 daily max) $137
*Non-refundable processing fee of $75 (up to $225 / $425 refundable)
OTHER CITY HALL FEES
Note: All equipment fees are for one setup and per day
Facility Fee Rate (All User Groups)
Room Setup Fee $158
Security Admin Fee $60
Janitorial Admin Fee $60
Insurance Admin Fee $90
B. LIBRARY MEETING ROOM RENTALS
USER GROUPS
Users are classified into the following groups for determining scheduling priority and the applicable fees and charges.
a. Individuals living in Hayward
b. Individuals living outside of Hayward
c. Non-profits [501(c) 3,4, or 6] and other public or private civic, cultural, educational, or charitable groups
d. Businesses and other commercial groups
667
57 e. City of Hayward and other government agencies (federal/state/city/local)
RENTAL RATES
FEE RATES BY USER GROUP **ALL RATES HOURLY**
Individual Organization Government
Library Meeting
Room and Event
Spaces
A.
Hayward
Resident
B.
Non‐
Hayward
Resident
C.
Non‐Profit
D.
Commercial
E.
Government
Agency
Fremont Bank
Foundation Room A
(Half)
$60.00 $80.00 $50.00 $150.00 $0.00
Fremont Bank
Foundation Room B
(Half)
$60.00 $80.00 $50.00 $150.00 $0.00
Fremont Bank
Foundation Room
(Full)
$100.00 $140.00 $75.00 $250.00 $0.00
Meeting Room C $30.00 $40.00 $25.00* $50.00 $0.00
Prep Area** $50.00 $50.00 $50.00 $100.00 $0.00
Weekes Library
Legacy Room*** $0.00 $0.00 $0.00 $0.00 $0.00
*Two (2) meetings each month in Meeting Room C will be free if the following criteria are met:
i. Meeting sponsored by a Group C user that is based in Hayward and serves primarily Hayward residents
ii. Meeting is open to the public
**Prep Area is a room next to Fremont Bank Foundation Room A with refrigerator, oven, and sink ***All events held in the Legacy Room are required to be open to the public
OTHER LIBRARY MEETING ROOM FEES
Meeting Room Fee Rate (All User Groups)
Room Setup Fee (If Requested) $50.00-$100.00
Janitorial Service Fee (When Needed) $57.00 Per Event, plus janitorial hourly service fee Attendant On Duty (When Needed) $75.00 Per Hour
Processing Fee $50 Per Reservation
Notes:
All meeting room applications must be submitted via the online scheduling system at least 30 days in advance. Paper applications will not be accepted.
Minimum rental is two (2) hours. Hourly rates are not pro-rated for parts of an hour.
Partial- hour reservations will be rounded up to the nearest hour.
Any setup and tear-down time required must be included in the time requested and will be billed at the same rental rate.
Payments must be made at least 14 days prior to the event. Events are not considered approved until payment is received in full.
Other service fees (when needed) may also be applicable. These may be assessed prior-to 668
58 or immediately following the reservation.
C. STREET MAINTENANCE
1. Cart Retrieval Fee $142.19113.75
2. Sign Fabricated & Installed by City Crew $868.75695.00
3. Illegal Dumping on Public Right-of-Way Fee Penalty
a. First Violation
Initial Inspection and noticing No Charge No Penalty
Reinspection shows violation
eliminated
No Charge No Penalty
Reinspection shows violation still
exists; City abates
$1,845.311,476.25 $400.00
b. Subsequent Violation within 12
Months (same property owner)
Initial Inspection and noticing $1,845.311,476.25 $800.00 Reinspection shows violation
eliminated
No Charge No Penalty
Reinspection show violation still
exists; City abates
$1,845.311,476.25 $1,600.00
Lien/Special Assessment Per Parcel $2,134.001,858.00
Hearing Fee; Administrative, Special
Assessment, Administrative Citation,
and Lien Hearings
$1,500.001,276.00
4. Special Events Per Hour $179.69143.75
669
59 Police Department
ANIMAL CONTROL
(Ref. Hayward Municipal Code, Chapter 4, Article 4)
For those fees designated to RTO (Refer To Office), the Animal Services Manager shall determine a reasonable fee or charge, basing that determination on the nature of the service; time spent; consistency with fees and charges specified for other services; actual costs incurred, including overhead and other indirect cost; and any other relevant factors.
1. Impounding Charges
a. For each dog and cat
(1) 1st impoundment $50.00 penalty
(2) 2nd impoundment within one year $75.00 penalty
(3) 3rd impoundment within one year $150149.00 penalty
(4) Impound dangerous animal $190148.00 penalty
(5) Field Impound $150125.00
b. For any unsterilized dog or cat impounded, an additional fee is assessed as mandated by the State of California Food & Agricultural Code.
(1) 1st Impoundment $35.00 Penalty
(2) 2nd Impoundment $50.00 Penalty
(3) 3rd Impoundment $100.00 Penalty
c. For each horse, bull, cow, steer, calf, colt, sheep, lamb goat or hog (1) 1st impoundment RTO (minimum field
impound) Charge
will be total direct
cost
(2) 2nd impoundment within one year RTO (minimum field
impound) Charge
will be total direct
cost
(3) 3rd impoundment within one year RTO (minimum field
impound) Charge
will be total direct
cost
d. For each non-specified animal (rabbit, monkey, rat, etc.) RTO (minimum 1st impound)
RTO (minimum 1st
impound)
2. Feeding and Boarding Charges Per Day. Boarding charges shall be levied as of the first day of impoundment. Charges shall be waived where the animal is redeemed “off the truck.”
a. For each dog, cat or small domestic pet $15.00
b. Special needs animal (medications given, treatment) $37.00 per day c. For each horse, bull, cow, hog, steer, lamb, sheep, goat, colt, or calf RTO. Charge will be 670
60 total direct cost
d. For lamb, sheep, goat, other small livestock maintained at shelter $24.00 e. For each non-specified animal RTO (minimum $15
board fee)
3. Special Services
a. Owner surrender of adult unlicensed animals (boarding fees for the State mandated period additional)
$4027.00 Per Animal
b. Owner surrender of additional animals less than ten weeks of age.
Boarding fees for the State mandated holding period will also be charged $9.00 Per Animal
c. Owner surrenders - small animals/bird
Boarding fees for the state mandated holding period will also be charged $34.00 Per Animal
d. Owner brings dead animal to shelter for disposal
(1) Under 50 lbs. $50.00 Per Animal
(2) Over 50 lbs. $75.00 Per Animal
(3) Transportation of disposal $14596.00 Per
Animal
e. Transportation of stray injured or sick owned animal to a veterinarian where owner is later identified
$13096.00
f. Veterinary treatment provided to an animal housed in the Shelter where the owner is later identified
Actual Vet Costs
g. Rabies vaccination Actual Vet Costs
h. In-house cat, dog, or rabbit vaccinesPara-influenza type vaccine Actual Vet Costs$10.00
i. Felv/FIV combo test – in-house $25.00 minimum
j.i. Deworm & Flea Preventative
(1) Cat $10.00
(2) Dog – under 25lbs. $15.00
(3) Dog – 25.1-50lbs. $30.00
(4) Dog – 50.1-100lbs. $45.00
j. Felv/FIV combo test – in-house $45.00
k. Microchip Insertion
(1) Animal adopted from the Shelter $15.00
(2) Animals not adopted from the Shelter $3029.00
4. Animal License and Permit Fees
a. Dog License
(1) Flat fee is for 1, 2 or 3 years depending on Rabies Vaccination Certificate (not to exceed 3 years)
$17.00
(2) Unsterilized animal (flat license or license renewal fee additional) $35.00 penalty (3) License renewal – replacement tag additional if needed $17.00 plus penalty 671
61 The Animal Services Manager is authorized to reduce dog license fees by one half of the amount set forth above
b. Late Penalty $5.00
c. Replacement license tag issued at time of renewal $413.00 d. Replacement license tag issued not at time of renewal $1213.00 e. Seeing or hearing dog No Charge
f. Fancier's Permit $395243.00
5. Observation Fees
All observation fees are assessed at the full rate and are not refundable, either in part or in full.
a. For each dog, cat or small domestic pet for quarantine, evidence and protective custody. Boarding fees for the State mandated holding period will also be charged.
$5.00 Per Day
b. Other Animals Actual Costs per
inspection
c. Property inspections (required prior to home quarantines and for the private retention of all animals declared dangerous outside City of Hayward hearing)
$75.00
6. Adoption Fees RTO (minimum
$5.00)
a. The fees charged for dogs and cats offered for adoption shall be set by the Animal Services Manager. In no case shall this amount be less than $5.00. In no case shall animals listed as "Owner Surrendered" be adopted by the previous owner without payment of all fees and charges (as specified in the schedule) for shelter service in impounding and caring for the animal
$20.00
b. All Other Animals Market Value
c. Spaying and neutering (mandated for dogs and cats prior to adoption) Veterinary contract cost
d. Administrative processing fee for the return of animals adopted from the shelter
$1511.00
7. Hearing Fee: Hearing and inspection of property of owners of animals declared dangerous or potentially dangerous
$200150.00
POLICE ADMINISTRATION
1. Photocopying of Reports
a. Traffic Accident Reports $2522.00 Per Report
b. Other Reports $2522.00 Per Report
2. Photographs $4033.00 Each
3. Citation Sign off-Outside Agencies $3327.00 Per
Citation
672
62 4. Fingerprinting
(Fingerprint processing fees established by Federal or State agencies shall be additional charge.)
$4235.00 Each
5. Traffic Police Security Services
a. Traffic control and police security services for pre-planned, non-city sponsored events
Time & Motion
b. Planned traffic control for contractors and utilities Time & Motion
6. Permit Processing
(Fees are for processing only, fingerprint and Department of Justice fees are not included)
a. Taxi Drivers
(1) Initial Permit $923825.00
(2) Annual Renewal$ 461412.00
(3) Annual taxi operating sticker $230206.00
(4) Lost permit replacement $4235.00
b. Tow Permits
(1) Company 1st License $461412.00
(2) Company Annual Renewal $6453.00
(3) Driver 1st License $461412.00
(4) Driver Annual Renewal $6453.00
(5) Lost Permit Replacement $6453.00
c. Massage Establishments
(1) Initial Inspection/application and processing of new massage establishment
$1,1541,031.00
(2) Annual Renewal fee for massage establishment $384318.00 (3) Badge Replacement $128106.00
(4) Massage Out-Call initial inspection/application $1,1541,031.00 (5) Massage Out-Call renewal $241.00
d. Card Clubs Employee Permit
(1) Initial permit $241.00
(2) Annual renewal $256212.00
(3) Lost permit replacement $128106.00
e. Firearms
(1) Background Investigation Time & Motion
(2) Firearm dealers annual permit $1,9651,743.00
f. Employees Working at a Cannabis Establishment
(1) Employee Work Permit Application Fee
673
63 a. Employee background check (live scan + fingerprint/photograph processing fee)
$82.00 Vice
Any charges not specified below shall be established by State and/or Federal Statutes
(2) Other Permit processing Time & Motion
7. Alarm Permit Fee
a. New and annual renewal: $2522.00
b. For Low income or persons in a temporary or permanent disabled status who:
$1029.00
(1) meet the City income guidelines as defined in the All City Department section of the Master Fee Schedule and
(2) file with the Revenue Division of the Finance Department a discount application and adequate documentary evidence showing that the Permit applicant comes within the provision of subparagraph (a).
8. False Alarm Fees (for instances of false alarms within any one-year period):
a. First False Alarm Fee $0.00 Records
b. Second False Alarm Fee $185.00
c. Third False Alarm Fee
Penalty
$185.00
$50.00
d. Fourth False Alarm Fee
Penalty
$185.00
$200.00
e. Fifth and Each Fee $185.00
Subsequent False Alarm Penalty $400.00
9. Vehicle Release Fee $278250.00
10. Vehicle Verification or Administrative Fee
a. Onsite verification $114103.00
b. Offsite verification $229206.00
11. Communication Tapes $119101.00 Per
Tape
12. Clearance Letters $25.00 Per Letter
13. Auto Sales/Repair Permit $254212.00
14. Vehicle Abatement $254212.00 Per
Vehicle
Any charges not specified below shall be established by State and/or Federal statutes.
a. Cite & Release $89.00
b. Hold for Court $180.00
c. Transfer to Santa Rita $199.00
15. Social Host Accountability Ordinance
674
64 The following penalties and/or cost recovery are authorized by Chapter 4, Article 11 of the HMC. Penalties for violations and cost recovery are separate and distinct charges. Penalties for Violation – The following is authorized by sec 4-11.20 HMC.
a. First Violation $750.00
b. Second Violation $1,500.00
c. Third & Subsequent Violations $2,500.00
Public Safety Services/Response Cost - The following is authorized by sec 4-
11.25 HMC
d. Recovery of the cost of the public safety response to a “Social Host” ordinance violation using the fully burdened cost allocation rate.
Time & Motion
16. Firearms Range Maintenance Fees – apportions the upkeep of the firearms range among user law enforcement agencies over a fiscal year period $2,000.00
17. Alcohol
a. Level I – Alcoholic Beverage Establishment Retail License Fee – Full service restaurants, wine shops, breweries, distilleries; and retail stores using no more than 5% of their floor area for alcohol sales, storage and display.
$280.00
b. Level II – Alcoholic Beverage Establishment Retail License Fee – All alcoholic beverage outlets other than Level I.
$1,120.00
c. Critical Incident Fee Time & Motion
d. Violation of Alcoholic Beverage Outlets Ordinance
(1) First Offense $750.00
(2) Second Offense $1,500.00
(3) Third and subsequent Offenses $2,500.00
e. Reinspection Fee Time & Motion
f. Alcohol Sales – Special Event Permit $304.00
Tow Operation Fee
Fees to be charged for tow operations shall not be in excess of the following schedule:
1. Towing
a. Towing of vehicles of others
(From public and private property)
$281.25225.00
b. All other towing:
1. Passenger vehicles $281.25225.00
2. Motorcycles $281.25$225.00
3. Trucks to 10,000 lbs. (unloaded) $281.25$225.00
4. Trucks 10,000 to 26,000 lbs. $312.50250.00
5. Trucks over 26,000 lbs. $468.75375.00
675
65 c. Extra labor charges on disabled vehicles
Applicable 1/2 hours after arrival of tow truck
(Per hour or portion thereof, at 15-minute increments)
$237.50190.00/hr.
d. Gate fee request between 5:00 PM and 8:00 AM
On weekdays and all day Saturday, Sunday and Holidays
$150120.00
2. Storage (Storage charges applicable after 8 hours)
a. Passenger vehicles, motorcycles and trucks (To 8,000 lbs., outside per 24- hour period)
$112.5090.00
b. Passenger vehicles, motorcycles and trucks (To 8,000 lbs., inside per 24- hour period)
$112.5090.00
c. Trucks over 8,000 lbs., buses, and trailers over 20 feet long $156.25125.00
3. Miscellaneous Service to the Public
a. Service charges on disabled vehicles where no tow is made $125100.00 b. Release of vehicle from hook-up after authorization to tow $112.50900.00
4. Complicated Tow
a. Trailer con gear (big rig dolly) $187.50150.00
b. Air cushion, includes operator for 3 hours $1,8751500.00 c. Lumper, or extra personnel 6am to 6pm $62.5050.00/hr. (2hr. min)
5. City Owned Vehicles
a. Removal or tow of vehicle $6050.00
b. Service charge on disabled vehicle (no tow) $6050.00 c. Tow from outside of City of Hayward $6050.00/hr. +
$1.00 Per Mile
**$362.50290 if 2 axle to portal** plus for Air cushion Towing, add $213.75 174 for first three hours then $500400 after
**$454 567.50 if 3 axle to portal** plus for Air cushion Towing, add $174 213.75 for first three hours then $500400 after
Concealed Carry Weapons Permit
Fees below do not include State or other applicable fees:
1. New Permit Fee
a. Standard - 2 Years $430167.00
b. Judicial - 3 Years $430.00$165.00
c. Reserve - 4 Years $430.00$165.00
d. Employment - 90 Days $430.00$165.00
2. Renewal Fee
a. Standard - 2 Years $9525.00
b. Judicial - 3 Years $95.00$25.00
676
66 c. Reserve - 4 Years $95.00$25.00
d. Employment - 90 Days $95.00$25.00
Hayward Film Permit
1. Film Permit applications $125.00 Per Day
2. Expedited Film Permit (3-5 days) $250.00 (excludes
larger productions)
3. Film Permit (TV series, movies, feature films, pilots) $175.00 Per Day Minor Encroachment Permit (filming) – excluding work to be performed by Public Works, i.e., no traffic control plan provided, just review Dependent on
encroachment type.
Refer to Engineering
Section B(5)
4. Major Encroachment Permit (filming) – includes work from Public Works, i.e., traffic control plan
Time & Motion,
$4,000 Deposit.
Refer to Engineering
Section B(6)
5.4. Police clearance (filming) $346309.00 Hourly
6.5. Fire Permit (filming) $318262.00 flat fee
(does not include
cost if presence is
required at event)
7.6. Filming on City Property/Facilities/Hangars (varies) Airport Property and Hangars – filming and Photography requests will be authorized at the discretion of the Airport Manager provided that the requested activity will in no way interfere with the safe, orderly, and uninterrupted use of Airport facilities by Airport users or portrays the Airport in a negative manner $1,500.00 daily fee
(extra labor,
security engineering
or comparable cost
are not included)
8.7. Filming at City Hall $575.00 daily fee
(does not Include
cost of guard,
janitorial and
insurance)
677
67 Utilities & Environmental Services
1. SANITARY SEWER SERVICE CHARGES AND FEES
Sewer System Connection Charge (Reference Hayward Municipal Code, Chapter 11, Article 3, Section 11-
3.255).
CurrentSep 1, 2025 Sep 1, 20265
(1) Single family, duplex, triplex,
and fourplex residential units,
townhouses, and planned
developments
$13,235 $14,55913,235
(2) Multi family, high density
residential, and mobile homes,
each residential unit
$11,781 $12,96011,781
(3) Accessory Dwelling Units
(ADUs, where applicable), each
unit
$5,295 $5,8255,295
(4) Commercial, industrial,
institutional and all other
connections:
Per gallon of daily capacity
required to serve the user
$32.98 $36.2832.98
Per pound per year of
biochemical oxygen demand
(cBOD)
$34.11 $37.5334.11
Per pound per year of
suspended solids (SS)
$22.34 $24.5822.34
Minimum charge $13,235 $14,55913,235
For the purposes of calculating non-residential sewer connection fees, carbonaceous biochemical oxygen demand (CBOD) and suspended solids (SS) will be reduced by 50%70% of the estimated values in the actual discharge, but not lower than the CBOD and SS for domestic wastewater, that is, 371307 milligrams per liter and 297258 milligrams per liter respectively. The property will be entitled to discharge CBOD and SS concentrations commensurate with the estimated actual concentrations. The volume component will not be reduced and will be calculated at 100% of the estimated discharge. The CBOD and SS reduction is applicable only to estimated daily discharge of 25,00050,000 gallons or less.
Discharge in excess of 50,000 gallons per day from a facility will be subject to a sewer connection fee based on full CBOD and SS concentrations. This provision will be in effect through June 30, 2027.
September 30, 2025.
a. Interest Rates on Sewer Connection Fee Payment Agreements (Reference Hayward Municipal Code, Chapter 11, Article 3, Section 11-3.255)
12-month agreement – 4%
24-month agreement – 5%
36-month agreement – 6%
48-month (and longer) agreement – 7%
678
68 b. Sewer Service Charges (Reference Hayward Municipal Code, Chapter 11, Article 3, Section 11-
3.450)
679
69 Residential Service Eff. Jul 1, 20256 Eff. Jul 1, 20276 Residential Unit
(1) Standard (over 8 units of metered water
usage)
$53.5747.83 $60.0053.57 Per Month
(1) Duplex, Triplex, Fourplex (per unit) $53.5747.83 $60.0053.57 per month (2) Economy (5 to 8 units of metered water
usage)*
$25.23 $28.26 Per Month
(3) Lifeline (0 to 4 units of metered water
usage)*
$13.01 $14.58 Per Month
(4) Duplex, Triplex, Fourplex (per unit) $53.57 $60.00 Per Month (2)(5) Multi-Family (per unit) $48.7143.49 $54.5648.71 Per Month (3)(6) Mobile Home (per unit) $36.2332.34 $40.5836.23 Per Month (1) Economy (5 to 8 units of metered
water usage)*
(2) $25.
232
2.52 (3) $2
8.2 62
5.2 3
(4) per
mon
th
(5) Lifeline (0 to 4 units of metered
water usage)*
(6) $13.
011
1.61 (7) $1
4.5 81
3.0 1
(8) per
mon
th
*Economy and Lifeline rates are only applicable for
City water customers
Non‐Residential Service – Critical Users
Sewer Service Charge
Constituent/Unit Jul. 1, 20265 Jul. 1, 20276
Flow – Cost per 100 cubic feet (ccf) $6.150205.49120 $6.888306.15020 Biochemical Oxygen Demand – Cost Per Pound $0.578900.51680 $0.648400.57890 Suspended Solids – Cost Per Pound $2.000601.78620 $2.240702.00060
Non‐Residential Service – Coded Users
Sewer Service Charge Per ccf
With Irrigation Meter Without Irrigation Meter
Customer Classification Eff. Jul 1, 20265 Eff. Jul 1, 20276 Eff. Jul 1, 20265 Eff. Jul 1, 20276 All Other Domestic Use $8.917.95 $9.988.91 $8.027.16 $8.998.02 Restaurant w/ Grease
Interceptor $11.8010.53 $13.2211.80 $10.619.47 $11.8910.61 Restaurant w/o Grease $14.5212.96 $16.2714.52 $13.0611.66 $14.6313.06 680
70 Interceptor
Commercial Laundry $10.13039.04 $11.3510.03 $8.737.79 $9.788.73 Bakeries $16.1214.39 $18.0616.12 $15.5413.87 $17.4115.54 Industrial Laundry $15.7314.04 $17.6215.73 $14.1512.63 $15.8514.15 Beverage Bottling $10.239.13 $11.4610.23 $9.208.21 $10.319.20 Food Manufacturing $28.8125.72 $32.2728.81 $34.2530.58 $38.3634.25 Meat Products $19.2917.22 $21.6119.29 $14.7313.15 $16.5014.73 Slaughterhouse $22.2019.82 $24.8722.20 $20.0017.85 $22.4020.00 Dairy Product Processors $15.9214.21 $17.8415.92 $14.3212.78 $16.0414.32 Canning and Packing $11.3510.13 $12.7211.35 $10.219.11 $11.4410.21 Grain Mills $14.9313.33 $16.7314.93 $13.4612.01 $15.0813.46 Fats and Oils $10.779.61 $12.0710.77 $9.698.65 $10.869.69 Pulp and Paper $11.2810.07 $12.6411.28 $9.968.89 $11.169.96 Manufacturing
Inorganic Chemicals $18.2216.26 $20.4118.22 $16.4014.64 $18.3716.40 Paint Manufacturing $28.3925.34 $31.8028.39 $25.5622.82 $28.6325.56 Leather Tanning $37.3833.37 $41.8737.38 $33.6330.02 $37.6733.63 Fabricated Metal $6.585.87 $7.376.58 $5.925.28 $6.645.92
All non-critical commercial and industrial users will be included in the above UCC classification that most closely represents the wastewater discharge strength and characteristics in comparison with domestic wastewater definition in the Regulations, as determined by the Director of Public Works. The UCC designation of a particular industry may not necessarily correspond to the Standard Industrial Classification (SIC) which may be assigned for other purposes.
Unclassified and Critical Users
(1) “Critical Users” and those whose discharge does not respond to any UCC because of variations in wastewater constituents or treatment costs shall pay an amount calculated in accordance with the following formula where,
C = V/M (160 Cv + CB x BOD + CS x SS)
C = Sewer service charge during period for which billing is calculated.
V= Volume of water consumed per hundred cubic feet (CCF) during period for which the billing is calculated (total of public water service, metered flow and all private sources, except those meters or services specifically identified for irrigation purposes only).
BOD= Average Biochemical Oxygen Demand, in milligrams per liter, from user during period for which the billing is calculated.
SS= Average Suspended Solids, in milligrams per liter, from user during period for which the billing is calculated.
Cv = Treatment cost per hundred cubic feet of water
CB = Treatment cost per pound of BOD
CS = Treatment cost per pound of SS
M = 160 for users with separate irrigation meters; and 178 for users without separate irrigation meters.
681
71 (1) The minimum fee for each non-residential user shall be that established for one (1) Service Unit per month.
Per Hayward Municipal Code Chapter 11, Article 3, Sec. 11-3.450 and Sec 11-3.455, the basis for determining the cost for treating and collecting wastewater will be the “service unit” which will be considered to be the basic charge for each premises computed on the basis of treating wastewater. The service units for commercial and industrial premises shall be based on categories of usage with similar treatment costs and grouped into User Classification Codes. The categories of usage, user classification codes, and service units to be applied per month for the purpose of determining the applicable sewer service charges shall be those as determined from time to time by resolution of the Hayward City Council.
Wastewater Discharge Permit Fees and Miscellaneous Charges
(1) Wastewater Discharge Permit Fees
Type of Permit New Permit Permit Renewal Amendment
Categorical $6,4506,144.0
0 $4,4304,218.00 $1,5751,501
.00
Non-Categorical Significant $4,7404,513.0
0 $3,1703,018.00 $1,2301,170
.00
Groundwater $2,3002,191.0
0 $1,2301,170.00 $760725.00
Non-Sewered Credit $280265.00 $280265.00 N/A
Special Purpose (one-time discharge) $1,2451,185.0
0 N/A N/A
(2) Compliance Schedule (for Correction of Violations) $950906.00
(3) Wastewater Sampling
(a) Composite Sample with Lab Costs $1,0651,013.00
(b) Composite Sample without Lab Costs $490466.00
(c) Grab Sample $505480.00
(d) Violation Follow-Up Sample with Lab Cost $1,0651,013.00 (e) Violation Follow-Up Sample without Lab Cost $490466.00 (f) Sampling Equipment Fee $25.00
(4) Compliance Schedule (for Correction of Violations) $1,0951,041.00
(5) Violation follow-up inspection $925883.00
(6) Development Plan Review
(a) Industrial $680646.00
(b) Commercial $680646.00
(c) Residential $420402.00
682
72 2. WATER SERVICE CHARGES AND INSTALLATION FEES
a. Water Services charges for labor and materials (Reference: Hayward Municipal Code, Chapter 11, Article 2, Section 11-2.02 and 11-2.04)
(a) Single Services. (Also see (4) below)
Meter Size and Service Size Fee
a. 5/8” x 3/4” $7,5456,560.00
b. 3/4” x 3/4” $7,545.00$6,560.
00 c. 3/4” x 1” $7,545.00$6,560.
00 d. 1” x 1” $7,8706,560.00
e. 1” x 1-1/2” $9,3007,750.00
f. 1-1/2 x 1-1/2 $10,2908,575.00
g. 1-1/2 x 2” $10,2908,575.00
h. 2” x 2” $10,5608,800.00
i. Larger than 2” x 2” Actual cost of labor, materials, & equipment**Deposit – T&M
Initial Deposit = $10,000
(b) Manifold Service. (Also see (4) below) Service Size Fee Meter Size and Service Size Fee
a. 5/8” x 5/8” 1” $9,5908,340.00
b. 3/4” x 3/4” 1” $9,5908,340.00
c. 1” x 1” 1 1/2” $10,0108,340.00
d. 1” x 1-1/2” 2” $10,6508,875.00
e. 1-1/2” x 1-1/2” 2” $11,2809,400.00
f. 1-1/2” x 2” 2” $11,5209,600.00
g. 2” x 2” 2” $11,7609,800.00
h. More than two meters or larger than 2" service
line
Deposit – T&M
Initial Deposit = $10,000Actual cost of labor,
materials, & equipment**
**Per Hayward Municipal Code Sec. 11-2.05, actual costs can be charged for services larger than two inches and unusually long or difficult service connections of any size.
(c) Meters Set on Existing Service. (Also see (4) below) Meter Size Fee
a. 5/8” $610530.00
683
73 b. 3/4” $680590.00
c. 1” $745650.00
d. 1-1/2” $975850.00
e. 2” $1,080.941.00
f. Larger than 2” Deposit – T&M
Initial Deposit = $1,000Actual cost of labor,
materials, & equipment**
(d) All meters in new developments shall have remote radio read capability. The cost for remote read capability is $200 per meter, which is in addition to the fees listed above.
b. Water Service, Construction Work, Temporary Service (Reference: Hayward Municipal Code, Chapter 11, Article 2, Section 11-2.22)
(1) Water Hydrant Meter Deposit
Water Hydrant Meter Deposit Fees
(for a 3/4” hydrant meter)
$1,800
Water Hydrant Meter Deposit Fees
(for a 3” hydrant meter)
$3,000
Water Hydrant Meter Deposit Fees
(for a 4” hydrant meter)
$3,000
Water Hydrant Meter Deposit Fees
(for a 6” hydrant meter)
$5,300
(2) The monthly meter service charge on all hydrant and construction meters shall be as follows:
a) 3/4” meter $16.00 Per Month
b) 3" meter $120.00 Per Month
c) 4" meter $210.00 Per Month
d) 6" meter $650.00 Per Month
(3) All hydrant and construction meter accounts will accrue charges for minimum monthly consumption on the following amounts. However, customers who report water consumption data during the reporting period of the first 5 working days of each month and provide proof they have consumed less than the proposed minimum charges in the table below shall only be billed for the amount consumed.
a) 3/4" meter 1,600 cu ft.
b) 3" meter 12,700 cu ft.
c) 4" meter 28,000 cu ft.
d) 6" meter 50,000 cu ft.
(4) Failure to Report Hydrant or Construction Meter Reading shall cause a $150.00 charge for 684
74 each month that a reading is not reported (Hayward Municipal Code, Chapter 11, Article 2, Section 11- 2.22). This charge is in addition to service charges and water usage charges.. (5) Unauthorized Connection to a Fire Hydrant – Water theft committed via the unauthorized connection to a fire hydrant in violation of an ordinance (Reference Hayward Municipal Code Chapter 11, Article 2, Section 11-2.24) adopted under this section is punishable as follows:
1. A fine not exceeding two thousand five hundred dollars ($2,500) for a first violation.
2. A fine not exceeding five thousand dollars ($5,000) for a second violation of the same ordinance.
3. A fine not exceeding ten thousand dollars ($10,000) for the third violation and each additional violation of the same ordinance.
c. Water System Facilities Fee (Referrence Hayward Municipal Code, Chapter 11, Article 2, Section 11-
2.35)
Water Connection (or Facilities) Fee:
(a) Residential
The facilities fee will be based on the water meter size required to meet the indoor demand (excluding fire service demand) and outdoor demand of the residence as determined by the City, based on fixture unit count. The meter that is installed may be larger than the meter facilities fee that is charged if the service is combined with a private fire service. For multi-family complexes, the facilities fee will be based on the water meter size required to meet the indoor demand for each dwelling unit, as determined by the City, regardless of the arrangement of water meters or meter sizes at the premises.
Size Sep 1, 2025 Sep 1, 2026
a. 5/8" meter $7,846.00 $8,631.00
b. 3/4" meter $11,773.00 $12,950.00
c. 1" meter $19,614.00 $21,575.00
(b) Non-residential, each separate irrigation service, and each residential unit with meter size larger than 1”
Size Sep 1, 2025 Sep 1, 2026
a. 5/8" meter $7,846.00 $8,631.00$7,846.
00 b. 3/4" meter $11,773.00 $12,950.00$11,7
73.00 c. 1" meter $19,614.00 $21,575.00$19,6
14.00 d. 1 ½" meter $39,228.00 $43,151.00$39,2
28.00 e. 2" meter $62,763.00 $69,039.00$62,7
63.00 685
75 f. 3" meter $124,425.00 $136,868.00$124
,425.00
g. 4" meter $196,141.00 $215,755.00$196
,141.00
h. 6" meter $392,282.00 $431,510.00$392
,282.00
i. 8" meter $627,651.00 $690,416.00$627
,651.00
j. 10" meter $902,249.00 $992,474.00$902
,249.00
(c) Fire Service, per service regardless of size $7,846.00
For reference, below is the fixture unit count and its corresponding equivalent meter size:
Equivalent Meter Size Calculation
Total Fixture Unit Count Corresponding Equivalent
Meter Size
Maximum Flow Capacity
(GPM)
0-23 5/8” 15
23.5-40 ¾” 25
40.5-85 1” 40
85.5-150 1 ½” 80
Meter Services Charges:
The bimonthly standard meter service charge for all meters (except temporary service for construction work), based on size of meter, shall be as follows:
Oct 1, 2025 Oct 1, 2026
a. 5/8" meter $41.34 $43.82
b. 3/4" meter $57.67 $61.14
c. 1" meter $90.37 $95.79
d. 1 ½" meter $172.08 $182.40
e. 2" meter $270.14 $286.35
f. 3" meter $580.64 $615.48
g. 4" meter $1,038.23 $1,100.52
h. 6" meter $2,133.15 $2,261.14
i. 8" meter $4,584.48 $4,859.55
j. 10" meter $6,872.40 $7,284.74
686
76 (1) Exemption for Low Income:
Notwithstanding any other provision of Hayward Municipal Code, Chapter 11, Article 2, the low income meter service charge shall be imposed by this subsection upon any customer that:
(a) meets the City income guidelines as defined in the All City Department section of the Master Fee Schedule and
(b) files with the Revenue Division of the Finance Department a discount application and adequate documentary evidence showing that the applicant comes within the provision of subparagraph (a).
(2) The bimonthly low-income meter service charge for 5/8”, 3/4", and 1” meters, shall be as follows:
Oct 1, 2025 Oct 1, 2026
a. 5/8” meter, low income $14.48 $15.35
b. 3/4” meter, low income $20.20 $21.42
c. 1” meter, low income $31.64 $33.54
(3) The water usage charge based on the number of cubic feet of water supplied during each billing period shall be as follows:
Water Usage Rates:
The water usage tiers and rates, based on consumption per hundred cubic feet (ccf), shall be as follows:
Usage Rate/ccf Rate/ccf
Residential: Oct 1, 2025 Oct 1, 2026
Single Family 1 – 8 ccf $8.01 $8.50
Multifamily (based on average
usage per dwelling unit)
9 – 18 ccf $9.49 $10.06
Over 18 ccf $11.66 $12.36
Non-Residential 1 – 110 ccf $8.69 $9.22
Over 110 ccf $10.20 $10.82
Irrigation 1 – 170 ccf $10.27 $10.89
Over 170 ccf $13.06 $13.85
Hydrant All Usage $9.67 $10.26
*Note: hundred cubic feet = approximately 748 gallons of water
Single Family Residential & Multifamily*
Cost Per CCF of Metered Water Rate/ccf Rate/ccf
Consumption: Oct 1, 2025 Oct 1, 2026
687
77 1 – 8 ccf (hundred cubic feet) $8.01 $8.50
9 – 18 ccf $9.49 $10.06
Over 18 ccf $11.66 $12.36
*Based on average usage per dwelling unit
Non‐Residential
Cost Per CCF of Metered Water Consumption:
Oct 1, 2025 Oct 1, 2026
1 – 110 hundred cubic feet (ccf) $8.69 $9.22
Over 110 ccf $10.20 $10.82
Irrigation
Cost Per CCF of Metered Water Consumption:
Oct 1, 2025 Oct 1, 2026
1 – 170 hundred cubic feet (ccf) $10.27 $10.89
Over 170 ccf $13.06 $13.85
Hydrant and Fireline Accounts
Cost Per CCF of Metered Water
Consumption:
All usage Oct 1, 2025 Oct 1, 2026
$9.67 $10.26
Note: hundred cubic feet = approximately 748 gallons of water
d. Fire Service Connections Inside City (Reference: Hayward Municipal Code, Chapter 11, Article 2, Section 11-2.39)
The fire service charge per each billing period shall be as follows:
Oct 1, 2025 Oct 1, 2026
a. 5/8” meter $8.80 $9.33
b. 3/4” meter $8.90 $9.43
c.a. 1” meter $9.17 $9.72
d.b. 1-1/2” meter $10.12 $10.73
e.c. 2” meter $11.81 $12.52
f.d. 3” meter $17.83 $18.90
g.e. 4” meter $28.21 $29.90
h.f. 6” meter $65.44 $69.37
688
78 i.g. 8” meter $129.65 $137.43
j.h. 10” meter $226.25 $239.83
e. Fire Flow Test. A charge of $407 shall be applied for each fire flow test.
f. A 50% surcharge on water usage shall be applied in the event that a fire service connection is used for any purpose other than those specifically identified in the Hayward Municipal Code, Chapter 11, Article 2, Section 11-2.20, that is, for extinguishing fires or authorized testing of the fire protection system(s).
Customers with appropriate documentation may qualify for a full or partial refund in specific circumstances such as:
• Authorized water usage (e.g., for extinguishing fires or planned test of fire protection systems). Fire service connections are not intended for day-to-day water consumption but may occasionally be authorized for specific uses. In instances where customers can provide documentation for authorized water usage, customers will only be billed for consumption and will be refunded if a 50% surcharge has been applied to their account.
• False usage volume (e.g., due to a faulty check valves). In instances where customers can provide proof that water consumption was due to an inaccurate meter reading, refunds can be issued for any false consumption, inclusive of the 50% surcharge.
g. Other Water System Fees and Charges
Account Establishment Fee $87.00
After-Hours Meter Activation Fee $120108.00
Meter Lock Fee $150138.00
Meter Removal Fee $145134.00
Meter Test Fee (up to 1-inch meter) $365333.00
Meter Test Fee (1 1/2-inch to 2-inch meter) $485441.00
Meter Test Fee (3-inch meter and larger) $605549.00
Noticing Fee $6.00
Service Restoration/Unlock Fee $117.00
Capping and uncapping of 2” meter and below $625570.00 Water Hydrant Meter Site Visit fee $125.00
Additional visits for backflow inspection/test fee $70.00 Meter Lock Fee due to Non-Compliant Backflow $150.00
Backflow Service Restoration/Unlock Fee $117.00
On-site visits requested by customers $50.00
h. Meter Tampering Feeine – Water theft committed via meter tampering in violation of an ordinance (Reference Hayward Municipal Code Chapter 1, Article 3, Section 1-3.00) adopted under this section, is punishable as follows:
(a) A fine not exceeding one hundred thirty dollars ($130) for a first violation. 689
79 (b) A fine not exceeding seven hundred dollars ($700) for a second violation of the same ordinance within one year of the first violation.
(c) A fine not exceeding one thousand three hundred dollars ($1,300) for the third violation and each additional violation of the same ordinance within one year of the first violation ordinance.
h.i. Special Billings
Special Requests for Water Billing
(a) Base Rate Services $26.00
(b) Each Additional Meter $9.00
i.j. Development Plan Review
Residential $200.00
Commercial $300.00
Industrial $300.00
Additional Development Plan Review $205.00
(After three rounds of plan review, additional review time will be billed in hourly increments.)
j.k. Water Service Connection Plan Review (Outside City of Hayward’s Jurisdiction) (a) From main in street or easement to water meter up to 100 linear feet $528.00 (b) Each additional 100 linear feet or fraction thereof (up to 400 linear feet) $396.00
k.l. Water System Impact Evaluation $10,000 Deposit
l.m. Sanitary Sewer System Impact
Evaluation $10,000 Deposit
Land Use Category Description Minimum Parcel
Size
Runoff Factor Service Charge/Runoff
Acre/Year
Commercial/Industrial 0.25 0.80 $338.32
Parking Lots 0.25 0.80 $285.60
Utilities 0.25 0.80 $285.60
Institutional/Apartments 0.25 0.60 $285.60
Condominium # 0.60 $285.60
Single Family up to 4 -Plex 0.25 0.40 $285.60
Single Family Ranches 0.25 0.40 $285.60
Vacant Land (Utilized) 10 0.01 $285.60
Vacant Land (Non-utilized) 17 0.00 $285.60
Owned by Government
Parcels w/o Valuation
Utilities on Leased Land
Cemeteries
Common Area
0.25 0.40* $285.60
NOTES:
(1) LUF = Land Use Factor coding system utilized by Alameda County Flood Control (2) Minimum Parcel Size is the minimum size on which charges are calculated (3) Runoff Factor is the ratio between impervious surface area and total surface area as 690
80 determined by the Alameda County Flood Control District # Condominium parcel size is determined by dividing the parcel size by the total number of units. *Or as determined
Rate Formula: Service Charge per year =
PARCEL SIZE x RUNOFF FACTOR x SERVICE CHARGE/RUNOFF ACRE/YEAR
3. STORMWATER
a. Stormwater Treatment Measure Inspection $635606.00
b. Stormwater Facility Inspection
Industrial (under State Permit) $545518.00
Industrial (not under State Permit) $545518.00
Restaurant $350331.00
Commercial $295281.00
The stormwater facility inspection fee will be waived if the inspection does not result in an adverse finding for the property and the potential for pollutant discharge is nonexistent.
Land Use Category Description Minimum Parcel
Size
Runoff Factor Service Charge/Runoff
Acre/Year
Commercial/Industrial 0.25 0.80 $338.32
Parking Lots 0.25 0.80 $285.60
Utilities 0.25 0.80 $285.60
Institutional/Apartments 0.25 0.60 $285.60
Condominium # 0.60 $285.60
Single Family up to 4 -Plex 0.25 0.40 $285.60
Single Family Ranches 0.25 0.40 $285.60
Vacant Land (Utilized) 10 0.01 $285.60
Vacant Land (Non-utilized) 17 0.00 $285.60
Owned by Government
Parcels w/o Valuation
Utilities on Leased Land
Cemeteries
Common Area
0.25 0.40* $285.60
NOTES:
(1) LUF = Land Use Factor coding system utilized by Alameda County Flood Control (2) Minimum Parcel Size is the minimum size on which charges are calculated (3) Runoff Factor is the ratio between impervious surface area and total surface area as determined by the Alameda County Flood Control District # Condominium parcel size is determined by dividing the parcel size by the total number of units. *Or as determined
Rate Formula: Service Charge per year =
PARCEL SIZE x RUNOFF FACTOR x SERVICE CHARGE/RUNOFF ACRE/YEAR
691
81 4. RECYCLED WATER
(1) Recycled Water Connection Fee
The recycled water connection fee will be based on the recycled water meter size required to meet the recycled water demand of the property as determined by the City.
a. Size Sep 1, 2025 Sep 1, 2026
b. 5/8" meter $7,846.00 $8,631.00
c. 3/4" meter $11,773.00 $12,950.00
d.
e. 1" meter $19,614.00 $21,575.00
f. 1 ½" meter $39,228.00 $43,151.00
g. 2" meter $62,763.00 $69,039.00
h. 3" meter $124,425.00 $136,868.00
i. 4" meter $196,141.00 $215,755.00
j. 6" meter $392,282.00 $431,510.00
k. 8" meter $627,651.00 $690,416.00
l. 10" meter $902,249.00 $992,474.00
(2) The bimonthly standard recycled water meter service charge for all recycled water meters, based on size of meter, shall be as follows:
Oct 1, 2025 Oct 1, 2026
a. 5/8" meter $41.34 $43.82
b. 3/4" meter $57.67 $61.13
c. 1" meter $90.37 $95.79
d. 1 ½" meter $172.08 $182.40
e. 2" meter $270.14 $286.35
f. 3" meter $580.64 $615.48
g. 4" meter $1,038.23 $1,100.52
h. 6" meter $2,133.15 $2,261.14
i. 8" meter $4,584.48 $4,859.55
j. 10" meter $6,872.40 $7,284.75
Recycled Water usage charge based on the number of cubic feet of water supplied during each billing period shall be as follows:
Usage Rate/ccf
Oct. 1, 2025
Rate/ccf
Oct. 1, 2026
Tier 1 1 - 170 CCF 1 - 170 CCF $7.70 $8.16
Tier 2 > 170 CCF > 170 CCF $8.70 $10.39
692
82 Cost Per CCF of Metered Water Consumption
Note: hundred cubic feet = approximately 748 gallons of water
5. LOW INCOME REFUSE SERVICE RATES
A residential subscriber shall receive a discount in the amount of $8.22 per month for refuse service for a single-unit dwelling based on the following:
a. The subscriber meets the City income guidelines as defined in the All City Department section of the Master Fee Schedule and
b. The subscriber files with the Revenue Division of the Department of Finance a discount application and adequate documentary evidence showing that the subscriber comes within the provision of subparagraph (a).
6. SOLID WASTE PLAN REVIEW FEES
Development Plan Review
Single Family or Remodel $7762.00
Tract Development $250200.0
0 Commercial/Industrial
Tenant Improvement w/ Trash Enclosure
$187150.0
0 Tenant Improvement w/o Trash Enclosure $125100.0
0 Mixed Use (Commercial & Residential) Actual cost
693
83 Glossary of Terms
The following description of fee charges has been prepared for your convenience. If you have any questions regarding fee charges, please feel free to discuss them with a member of the City staff.
Annexation Fees:
Charges for time and material costs involved in processing applications for the annexation of property to the City.
Compliance Services Fees:
Charges imposed to defray the City’s labor and materials cost of assuring compliance with specific City ordinances such as weed abatement.
Inspection Fees:
Charges related to the physical inspection of facilities, buildings, sites, equipment, etc.
Licenses and Permit Fees:
Charges imposed to defray the cost incurred in processing applications for licenses and permits which authorize the holder to engage in a specific function or activity and include the costs of assuring compliance with related conditions and regulations.
Penalty Fees and Fines:
Charges imposed for non-compliance with specific City requirements.
Plan Check Fees:
Charges for time and materials costs for the detailed inspection of plans submitted to the City for review.
Rental Fees:
Charges for use of City facilities and services.
Service Fees:
Charges for time and materials costs incurred by the City in the course of providing those services for which fees or charges are not otherwise specifically set forth.
Special Services Fees:
Charges for time and materials costs incurred by the City in the course of providing extraordinary services. 694
City of Hayward - Hourly Rates
Title Hourly Rate
Blended Rates
BUILDING $227.10
CODE ENFORCEMENT INSPECTION $191.31
FIRE PREVENTION $318.92
HAZARDOUS MATERIALS $198.70
HOUSING $199.42
LIBRARY SERVICES $168.96
MAINTENANCE SERVICES $243.19
PLANNING $249.16
Position Rates
ACCOUNT CLERK $82.77
ACCOUNTANT $143.85
ACCOUNTING MANAGER $204.97
ADMINISTRATIVE CLERK II $104.27
ADMINISTRATIVE HEARING OFFICER $244.68
ADMINISTRATIVE INTERN $78.90
ADMINISTRATIVE SECRETARY $116.99
ADMINISTRATIVE SUPERVISOR $201.54
AIRPORT BUSINESS SUPERVISOR $214.66
AIRPORT MAINTENANCE WORKER $174.78
AIRPORT MANAGER $273.51
AIRPORT OPERATIONS SPECIALIST $130.79
AIRPORT OPERATIONS SUPERVISOR $248.62
ANIMAL CARE ATTENDANT $89.26
ANIMAL CONTROL OFFICER $106.65
ANIMAL SERVICES ADMINISTRATOR $213.58
APPARATUS OPERATOR (56 HR) $262.74
ASSISTANT CITY ATTORNEY $238.96
ASSISTANT CITY MANAGER $350.47
ASSISTANT TO CITY MANAGER $264.70
ASSOC CIVIL ENGINEER $200.46
ASSOC TRANSPORTATION ENGINEER $183.62
ASSOC TRANSPORTATION PLANNER $137.95
The following hourly rates are used for services charged to external parties when those services are not already in the Master Fee Schedule 695
AUDIO VIDEO SPECIALIST $184.92
BACKFLOW/CROSS CONNECT TESTER $192.93
BATTALION CHIEF $400.36
CALL TAKER $114.16
CERTIFIED LATENT PRNT EXAMINER $204.66
CHEMIST $188.13
CHIEF ECONOMIC DEVELOPMENT OFC $261.55
CHIEF OF POLICE $575.08
CITY ATTORNEY $298.61
CITY CLERK $193.62
CITY COUNCIL $53.76
CITY MANAGER $367.51
COMMUNICAT & MARKETING OFFICER $231.15
COMMUNICATIONS ADMINISTRATOR $191.17
COMMUNICATIONS OPERATOR $146.95
COMMUNICATIONS SUPERVISOR $171.42
COMMUNITY SERVICE OFFICER $128.25
COMMUNITY SERVICES MANAGER $204.69
CONSTRUCTION INSPECTOR $148.03
COUNSELING SUPERVISOR $169.90
CRIME & INTELLIGENCE ANALYST $176.85
CRIME PREVENTION SPECIALIST I $125.54
CRIME PREVENTION SPECIALIST II $147.73
CRIME SCENE SPECIALIST $147.64
CRIME SCENE TECHNICIAN $119.13
CROSS CONNECT CONTROL SPEC $257.41
CUSTOMER ACCOUNT CLERK $135.11
CUSTOMER FIELD TECHNICIAN $211.56
DEP DIR OF DEV SERVICES $251.23
DEP DIRECTOR OF PUBLIC WORKS $260.84
DEPUTY CITY ATTORNEY II $196.62
DEPUTY CITY CLERK $146.18
DEP DIR OF MAINT SERVICES $231.11
DEPUTY DIRECTOR OF FINANCE $306.40
DEPUTY DIRECTOR OF HR $229.92
DEPUTY DIRECTOR OF IT $437.39
DEPUTY FIRE CHIEF (40 HR) $404.25
DEVELOPMENT REVIEW SPECIALIST $198.92
DIGITAL APPLICATIONS DEVELOPER $251.01
DIRECTOR OF DEVELOPMENT SVCS $274.23
DIRECTOR OF FINANCE $284.06
DIRECTOR OF HUMAN RESOURCES $245.97
DIRECTOR OF INFO TECH/CIO $511.95
DIRECTOR OF MAINTENANCE SVCS $431.72
696
DIRECTOR OF PUBLIC WORKS $430.95
ECON DEVELOPMENT SPECIALIST $157.42
ELECTRICIAN II $235.52
EMERGENCY MEDICAL SVCS COORD $171.23
ENGINEERING TECHNICIAN $109.37
ENVIRONMENTAL SERVICES MANAGER $309.67
EQUIPMENT MECHANIC I $174.87
EQUIPMENT MECHANIC II $177.07
EQUIPMENT OPERATOR $189.77
EQUIPMENT PARTS STOREKEEPER $176.92
EQUIPMENT SERVICE ATTENDANT $149.77
EQUITY AND INCLUSION OFFICER $198.91
EXECUTIVE ASSISTANT $126.72
FACILITIES & BUILDING MANAGER $339.07
FACILITIES CARPENTER II $170.93
FACILITIES LEADWORKER $307.72
FACILITIES PAINTER II $227.78
FACILITIES SERVICEWORKER II $187.31
FACILITIES SUPERVISOR $0.00
FAMILY COUNSELOR $139.06
FINANCE SUPERVISOR $164.62
FINANCE TECHNICIAN $136.37
FIRE MARSHAL EMT $343.49
FIRE SERVICES SUPERVISOR $215.64
FIRE TRAINING OFFICER (40 HR) $422.36
FIREFIGHTER (56 HR) $223.88
FLEET MAINTENANCE MANAGER $287.32
GEOGRAPHIC INFO SYSTEMS COORD $343.13
GRAPHICS & MEDIA RELNS TECH $127.77
HR ADMINISTRATIVE ASSISTANT $123.14
HUMAN RESOURCES ANALYST I $118.43
HUMAN RESOURCES ANALYST II $143.69
HUMAN RESOURCES MANAGER $253.48
HUMAN RESOURCES TECHNICIAN $104.00
HVAC MECHANIC $259.12
INFO SYSTEMS SUPPORT TECH $216.44
INFORMATION TECHNOLOGY MANAGER $350.96
IT TECHNICIAN II $244.88
JAIL ADMINISTRATOR $188.41
JAIL SUPERVISOR $142.08
LABORATORY TECHNICIAN $164.29
LABORER $142.88
LANDSCAPE MAINTENANCE MANAGER $298.70
LEAD PROGRAM ASSISTANT $109.00
697
LEGAL SECRETARY II $94.45
MAIL & PURCHASING CLERK $96.07
MAIL AND REVENUE CLERK $133.84
MAIL CLERK $109.87
MANAGEMENT ANALYST I $153.71
MANAGEMENT ANALYST II $197.32
MANAGEMENT FELLOW $111.75
MAYOR $103.06
NEIGHBORHOOD PARTNERSHIP MGR $191.15
OPERATOR IN TRAINING $187.26
PARALEGAL $110.94
PERMIT TECHNICIAN I/II $150.60
PERSONNEL OPERATIONS SPEC $137.31
POLICE CAPTAIN $472.46
POLICE LIEUTENANT $372.79
POLICE OFFICER $253.15
POLICE PROGRAMS ANALYST $167.67
POLICE RECORDS CLERK II $100.50
POLICE SERGEANT $292.06
PROCESS SERVER $301.77
PROPERTY TECHNICIAN $120.37
PURCHASING & SERVICES MANAGER $247.07
PURCHASING TECHNICIAN $117.97
REAL PROPERTY MANAGER $257.07
RECORDS SUPERVISOR $134.31
RESERVE OFFICER COORDINATOR PT $212.82
REVENUE MANAGER $288.29
SECRETARY $133.05
SENIOR ACCOUNT CLERK $126.57
SENIOR ACCOUNTANT $159.23
SENIOR ASSISTANT CITY ATTORNEY $282.86
SENIOR CIVIL ENGINEER $247.66
SENIOR CONSTRUCTION INSPECTOR $204.21
SENIOR CRIME & INTEL ANALYST $194.14
SENIOR CUSTOMER ACCOUNT CLERK $146.94
SENIOR EQUIPMENT MECHANIC $208.33
SENIOR FIRE TECHNICIAN $137.55
SENIOR MANAGEMENT ANALYST $219.61
SENIOR PARALEGAL $135.65
SENIOR SECRETARY $141.49
SENIOR TRANSPORTATION ENGINEER $200.84
SENIOR TRANSPORTATION PLANNER $177.98
SENIOR UTILITIES ENGINEER $291.07
SENIOR UTILITY LEADER $222.85
698
SHELTER OPERATIONS SUPERVISOR $131.16
SHELTER VOLUNTEER COORD $102.11
SOLID WASTE PROGRAM MANAGER $215.99
SOLID WASTE PROGRAM MANAGER $222.81
SR AIRPORT MAINTENANCE WORKER $203.25
SR UTILITY CUSTOMER SVC LEADER $214.05
SR UTILITY FIELD SVCS LEADER $236.66
SR WATER RESOURCES ENGINEER $277.98
SR WPSC INSPECTOR $233.99
STAFF FIRE CAPTAIN (40 HR) $329.12
STOREKEEPER - EXPEDITER $176.45
SUPERVISING CONSTRUCTION INSP $242.77
SURVEY ENGINEER $205.04
SURVEYOR $131.11
SUSTAINABILITY SPECIALIST $179.72
TECHNICAL INTERN $78.90
TRAFFIC SIGNAL TECHNICIAN $140.54
TREE TRIMMER $156.68
UTILITIES ENGINEERING MANAGER $396.60
UTILITIES MAINTENANCE MECHANIC $225.32
UTILITIES O & M MANAGER $354.91
UTILITIES SERVICE WORKER $182.55
UTILITY LEADER SEWER $204.88
UTILITY LEADER WATER $231.18
UTILITY WORKER SEWER $165.74
WATER METER MECHANIC $232.74
WATER POLLUTION CONTROL ADMIN $228.89
WATER RESOURCES MANAGER $340.46
WPCF LEAD OPERATOR $223.63
WPCF MANAGER $358.70
WPCF OPERATOR $242.53
WPSC INSPECTOR I $158.50
WPSC INSPECTOR II $200.56
YFSB ADMINISTRATOR $239.32
699
ATTACHMENT IV
Section Offense FY 2025-26 Fine Proposed FY 2026/27 Fine Note Uniform Fire Code
9.01.4 Parked in Fire Lane $218.50 $218.50 No Change
Hayward Municipal Code
Chapter 4
4-15.20(a) Administrative Penalty associated with the Social Nuisance Ordinance
- 1st violation within a 12 month period: $750.00 $750.00 No Change - 2nd violation within a 12 month period: $1,200.00 $1,200.00 No Change - 3rd violation within a 12 month period: $2,500.00 $2,500.00 No Change - Add'l violations within a 12 month period: $5,000.00 $5,000.00 No Change Chapter 6 Violation of any provision regulating TAXICABS is subject to Government Code section 36900:
- 1st violation within a 12 month period (infraction): $100.00 $100.00 No Change - 2nd violation within a 12 month period (infraction): $200.00 $200.00 No Change - 3rd violation within a 12 month period (infraction): $500.00 $500.00 No Change - Add'l violations within a 12 month period (misdemeanor) $500.00 $500.00 No Change 6-5.04(a) Insurance
6-5.04(b) Taxicab Stands
6-5.04(c) Standing on Streets
6-5.04(d) Soliciting Passengers
6-5.04(e) Direct Route
6-5.04(f) Business License
6-5.04(g) Mechanical Condition
6-5.04(h) Exterior Condition
6-5.04(I) Complaint Procedure
6-5.04(j) Information to be posted in taxicabs
6-5.04(k) Excessive Charges
6-5.04(l) Sanitary Condition
6-5.04(m) Fire Extinguisher
6-5.04(n) Baggage
6-5.04(o) Refusal to Pay Fine
6-5.04(p) Refusal to Carry Passengers
6-5.04(q) Unlicensed Taxicabs
6-5.04(r) Taxicab Identification
6-5.04(s) Driver’s License and Permit
6-5.04(t) Operation certificate and license
6-5.04(u) Waybills Required
Hayward Traffic Code
5.02 Obediance to Traffic Control Devices $297.50 $297.50 No Change
6.01.1 No Parking - Red Curb Zone $79.00 $83.00 Increase $4.00
6.01.2 Yellow Curb, Loading Zone $79.00 $83.00 Increase $4.00
6.01.3 White Curb, Passenger Loading Zone $79.00 $83.00 Increase $4.00
6.01.4 Green Curb Zone - Over Time Limit $79.00 $83.00 Increase $4.00
6.01.5 Blue Curb, Disabled Persons Zone $337.50 $337.50 No Change
6.05 Parking in Alley $79.00 $83.00 Increase $4.00
6.06 Bus Zone $287.50 $287.50 No Change
6.23 Municipal Lot/City Property Special Restrictions $79.00 $83.00 Increase $4.00
6.23h Disabled Persons Stall $337.50 $337.50 No Change
6.24 Selling on Street/City Property $242.50 $242.50 No Change
6.30 Over Time Limit $79.00 $83.00 Increase $4.00
6.32 Commercial Vehicle, Over Posted Time Limit $129.50 $129.50 No Change
6.33 Commercial Vehicle in Residential Area $129.50 $129.50 No Change
6.35 Not Parked within Designated Space $79.00 $83.00 Increase $4.00
6.36(a) Residential Permit Parking only $79.00 $83.00 Increase $4.00
6.36(b) BART Commuter Parking on Designated Streets $55.00 $55.00 No Change
6.37 Driving Off Interstate Truck Route $79.00 $83.00 Increase $4.00
6.38 Commercial Vehicle in Posted No Parking $129.50 $129.50 No Change
6.39a Parked off Pavement or Not Leading to Garage $107.50 $107.50 No Change
8.10 Double Parked $79.00 $83.00 Increase $4.00
8.11 No Parking in Parkways $79.00 $83.00 Increase $4.00
8.12 Parked on Street over 72 Hours $79.00 $83.00 Increase $4.00
8.13 Parking on Street for Sale or Repairs $107.50 $107.50 No Change
8.14 Private Property Parking $107.50 $107.50 No Change
8.15 Disabled Persons Stall, Private Property $337.50 $337.50 No Change City of Hayward Traffic Code
Draft Fiscal Year 2026-27 Fine and Bail Schedule
Approved XXX
All fines not paid within legal time requirements will be assessed a penalty (total amount due will be the fine amount plus a penalty) (penalty equals double the fine amount plus an administration fee of $18)
700
ATTACHMENT IV
Section Offense FY 2025-26 Fine Proposed FY 2026/27 Fine Note City of Hayward Traffic Code
Draft Fiscal Year 2026-27 Fine and Bail Schedule
Approved XXX
All fines not paid within legal time requirements will be assessed a penalty (total amount due will be the fine amount plus a penalty) (penalty equals double the fine amount plus an administration fee of $18)
8.17 Narrow Street Posted No Parking $79.00 $83.00 Increase $4.00
8.18 Parked on Hill, Wheels not Curbed $79.00 $83.00 Increase $4.00
8.20.3 Posted No Parking $79.00 $83.00 Increase $4.00
8.20.4 No parking - Street Sweeping Zone $79.00 $83.00 Increase $4.00
8.21 Not 18", not Parallel to Left Side One Way $79.00 $83.00 Increase $4.00
8.22 Parked at Angle $79.00 $83.00 Increase $4.00
8.30 Temporary No Parking Area $79.00 $83.00 Increase $4.00
8.39 Leaving Attended Parking Lot without Paying $79.00 $83.00 Increase $4.00
8.50 Blocking Crosswalk $79.00 $83.00 Increase $4.00
California Vehicle Code
21113a Violate Restriction on School Grounds, etc. $79.00 $83.00 Increase $4.00 22500a No Parking in an Intersection $79.00 $83.00 Increase $4.00 22500b Parked Across Crosswalk $79.00 $83.00 Increase $4.00 22500d Parking W/I 15' of Fire Station Driveway $79.00 $83.00 Increase $4.00 22500e Parked Blocking Driveway $79.00 $83.00 Increase $4.00 22500f Parked on Sidewalk $79.00 $83.00 Increase $4.00
22500g Parked Adjacent To or Opposite Street Excavation $79.00 $83.00 Increase $4.00 22500h Double Parked $79.00 $83.00 Increase $4.00
22500i Bus Passenger Loading Zone w/Red Curb $287.50 $287.50 No Change 22500j No Parking in Tunnel or Tube $79.00 $83.00 Increase $4.00 22500k No Parking on a Bridge $79.00 $83.00 No Change
22500n (1) No Parking within 20' of an intersection $79.00 $83.00 Increase $4.00 22500n (2) No Parking within 15' of a crosswalk $79.00 $83.00 Increase $4.00 22502a Parked Wrong Side of Road/over 18" from Curb $79.00 $83.00 Increase $4.00 22507.8a Disabled Parking Space $340.50 $340.50 No Change 22507.8c Disabled Access Area $340.50 $340.50 No Change 22507b Disabled Parking - Obstruct or Block Access $340.50 $340.50 No Change 22513 Tow Truck on Freeway $79.00 $83.00 Increase $4.00 22514 Park w/in 15' of Fire Hydrant $79.00 $83.00 Increase $4.00 22515 Unattended Vehicle with Motor Running $79.00 $83.00 Increase $4.00 22516 Locked Vehicle Person Inside Can't Escape $113.50 $113.50 No Change 22521 Parking on or w/in 7.5' of Railroad Track $79.00 $83.00 Increase $4.00 22522 Block Sidewalk Ramp for Disabled Painted Red $340.50 $340.50 No Change 22523a Vehicle Abandoned on Highway or Street $460.50 $460.50 No Change 22523b Vehicle Abandoned on Private Property $460.50 $460.50 No Change 25300e Warning Device Parked Vehicle $79.00 $83.00 Increase $4.00 26708 Tinted windshield $79.00 $83.00 Increase $4.00
26710 Defective windshield $79.00 $83.00 Increase $4.00 27155 No gas cap $79.00 $83.00 Increase $4.00
27465b Bald tire $79.00 $83.00 Increase $4.00
4000a No evidence of current registration $79.00 $83.00 Increase $4.00 40226 Dismissal of Handicap Citation $79.00 $83.00 Increase $4.00 4462b Display false tab $79.00 $83.00 Increase $4.00
5200 No plate $79.00 $83.00 Increase $4.00
5204a Expired tags $79.00 $83.00 Increase $4.00