7.E

Page 128 of 459 ends

747 HOF-EELR707A 14K 4-POST RACK LL HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 53,283.70$ 55.53 23,695.26$ 748 HOF-EELR709A 12K SCISSOR RACK HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 32,282.14$ 55.53 14,355.87$ 749 HOF-EELR709APKG 12K SCISSOR PACKAGE HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 36,238.00$ 55.53 16,115.04$ 750 HOF-EELR724A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 32,424.68$ 55.53 14,419.26$ 751 HOF-EELR724APKG 12K SCISSOR FLUSH MNT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 36,378.00$ 55.53 16,177.30$ 752 HOF-EELR728APKG 12K 4-POST LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 37,538.00$ 55.53 16,693.15$ 753 HOF-EELR731A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 8,405.72$ 55.53 3,738.02$ 754 HOF-EELR738A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 10,081.20$ 55.53 4,483.11$ 755 HOF-EELR739A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 26,179.04$ 55.53 11,641.82$ 756 HOF-EELR740A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 26,706.48$ 55.53 11,876.37$ 757 HOF-EELR741A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 36,935.04$ 55.53 16,425.01$ 758 HOF-EELR742A LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 36,935.04$ 55.53 16,425.01$ 759 HOF-EELR783A SCISSR SHORT BAY LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 48,130.14$ 55.53 21,403.47$ 760 HOF-EELR783APKG 14K SCISSOR PACKAGE HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 51,398.00$ 55.53 22,856.69$ 761 HOF-EELR784A SCISSOR SHORTFM LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 48,130.14$ 55.53 21,403.47$ 762 HOF-EELR784APKG 14K SCISSOR FLUSH MNT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 51,398.00$ 55.53 22,856.69$ 763 HOF-EELR785A SCISSOR SHORTLL LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 55,326.32$ 55.53 24,603.61$ 764 HOF-EELR785APKG 14K SCISSOR LGTD/PKG HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 55,838.00$ 55.53 24,831.16$ 765 HOF-EELR786A SCISS/SHORTFMLL LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 55,326.32$ 55.53 24,603.61$ 766 HOF-EELR786APKG 14K SCISSOR FLUSH MNT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 55,838.00$ 55.53 24,831.16$ 767 HOF-EELR787A 14K SCISSOR SURFACEMT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 57,603.28$ 55.53 25,616.18$ 768 HOF-EELR787APKG 14K SCISSOR PACKAGE HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 61,038.00$ 55.53 27,143.60$ 769 HOF-EELR788A 14K SCISSOR FLUSHMT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 57,603.28$ 55.53 25,616.18$ 770 HOF-EELR788APKG 14K SCISSOR FLUSH MNT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 61,038.00$ 55.53 27,143.60$ 771 HOF-EELR789A 14K SCISSOR LIGHTED HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 64,902.82$ 55.53 28,862.28$ 772 HOF-EELR789APKG 14K SCISSOR LGTD/PKG HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 65,478.00$ 55.53 29,118.07$ 773 HOF-EELR790A 14K SCISSORFM LIGHTED HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 64,902.82$ 55.53 28,862.28$ 774 HOF-EELR790APKG 14K SCISSOR FLUSH MNT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 65,478.00$ 55.53 29,118.07$ 775 HOF-EEWA712G ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 43,916.14$ 55.53 19,529.51$ 776 HOF-EEWA712T GEOLINER 660 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 44,727.10$ 55.53 19,890.14$ 777 HOF-EEWA712TH3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 41,314.75$ 55.53 18,372.67$ 778 HOF-EEWA715G ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 49,379.44$ 55.53 21,959.04$ 779 HOF-EEWA715GE ALIGNER & SCAN HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 53,487.96$ 55.53 23,786.10$ 780 HOF-EEWA715GEE GEOLINER 670 AC200 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 51,248.82$ 55.53 22,790.35$ 781 HOF-EEWA715H ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 52,083.98$ 55.53 23,161.75$ 782 HOF-EEWA715HE ALIGNER & SCAN HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 56,189.88$ 55.53 24,987.64$ 783 HOF-EEWA715HEE GEOLINER 670 AC400 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 53,857.52$ 55.53 23,950.44$ 784 HOF-EEWA715TBEE3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 51,757.56$ 55.53 23,016.59$ 785 HOF-EEWA715TBV3 IMAGING WHEEL ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 54,078.00$ 55.53 24,048.49$ 786 HOF-EEWA715THEE3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 50,117.51$ 55.53 22,287.26$ 787 HOF-EEWA715THV3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 48,334.35$ 55.53 21,494.29$ 788 HOF-EEWA717C ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 31,658.00$ 55.53 14,078.31$ 789 HOF-EEWA721G 630 ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 36,937.62$ 55.53 16,426.16$ 790 HOF-EEWA729A GEOLINER 920 ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 62,987.49$ 55.53 28,010.54$ 791 HOF-EEWA729B GEOLINER 920 ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 68,719.09$ 55.53 30,559.38$ 792 HOF-EEWA751H GEO320 ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 43,965.26$ 55.53 19,551.35$ 793 HOF-EEWA752BEE2 ALIGNER W/SCAN TOOL HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 57,838.00$ 55.53 25,720.56$ 794 HOF-EEWA752BEE3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 53,652.36$ 55.53 23,859.20$ 795 HOF-EEWA752BV2 GEOLINER 770 W/AC400 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 56,827.42$ 55.53 25,271.15$ 796 HOF-EEWA752BV3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 52,493.16$ 55.53 23,343.71$ 797 HOF-EEWA752HV2 GEOLINER 770 W/AC200 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 54,238.80$ 55.53 24,119.99$ 798 HOF-EEWA752HV3 GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 50,101.77$ 55.53 22,280.26$ 799 HOF-EEWA753B ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 70,168.52$ 55.53 31,203.94$ 800 HOF-EEWA753BEE GEOLINER 790 AC400 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 59,355.86$ 55.53 26,395.55$ 801 HOF-EEWA753BV 790ALINGER W/VIN HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 63,362.30$ 55.53 28,177.21$ 802 HOF-EEWA753H ALIGNER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 67,189.75$ 55.53 29,879.28$ 803 HOF-EEWA753HEE GEOLINER 790 AC200 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 61,944.50$ 55.53 27,546.72$ 804 HOF-EEWA753HV GEOLNR IMAGN ALIGNR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 53,698.15$ 55.53 23,879.57$ 805 HOF-EEWA820A GEOLINER 920 HD ALIGN HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 66,216.28$ 55.53 29,446.38$ 806 HOF-EEWA820B GEOLINER 920 HD ALIGN HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 72,241.70$ 55.53 32,125.88$ 807 HOF-EEWB710DW WHEEL BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 23,122.88$ 55.53 10,282.74$ 808 HOF-EEWB746AS WHEEL BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 9,230.52$ 55.53 4,104.81$ 809 HOF-EEWB753BE8 7800P BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 19,048.00$ 55.53 8,470.65$ 810 HOF-EEWB761AE1 GEODYNA7100 HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 7,529.20$ 55.53 3,348.24$ 811 HOF-EEWB761AM BALANCER MTRCYCL HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 8,568.62$ 55.53 3,810.47$ 812 HOF-EEWB764AL WHEEL BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 12,909.82$ 55.53 5,741.00$ 813 HOF-EEWB765AL WHEEL BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 14,903.32$ 55.53 6,627.51$ 814 HOF-EEWB765AP WHEEL BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 16,309.86$ 55.53 7,252.99$ 815 HOF-EEWB766BE5 8200P BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 32,935.14$ 55.53 14,646.26$ 816 HOF-EEWB771AP230 GEO9000P BALANCER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 39,538.74$ 55.53 17,582.88$ 817 HOF-EEWB774AE8 GEODYNA 7340L BALANCR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 11,358.84$ 55.53 5,051.28$ 818 HOF-EEWB774APC GEODYNA 7340P HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 11,448.89$ 55.53 5,091.32$ 819 HOF-EEWB774APE11 GEODYNA 7340P BALANCR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 12,391.94$ 55.53 5,510.70$ 820 HOF-EEWH734B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 54,121.40$ 55.53 24,067.79$ 821 HOF-EEWH742BHNA MONTY 8600 T/CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 36,503.24$ 55.53 16,232.99$ 822 HOF-EEWH747B SMARTSPEED CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 24,927.62$ 55.53 11,085.31$ 823 HOF-EEWH748B SMARTSPEED CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 14,492.20$ 55.53 6,444.68$ 824 HOF-EEWH764AU1 MONTY1270 CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 7,529.20$ 55.53 3,348.24$ 825 HOF-EEWH768AC 8100S CTR/PST CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 19,575.44$ 55.53 8,705.20$ 826 HOF-EEWH779A MONTY TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 16,713.70$ 55.53 7,432.58$ 827 HOF-EEWH779AU2 SING/SPD TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 15,658.00$ 55.53 6,963.11$ 828 HOF-EEWH779CU1 MONTY1675 SMART SPEED HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 15,434.53$ 55.53 6,863.74$ 829 HOF-EEWH779CU2 MONTY1675 SING SPEED HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 14,507.17$ 55.53 6,451.34$

Page 49 of 65 ends

7.E

Page 129 of 459 ends

830 HOF-FPA18210 FOUR POST LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 51,561.68$ 55.53 22,929.48$ 831 HOF-HOFCOMBO1 1270&7100 COMBO ASST HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 12,397.84$ 55.53 5,513.32$ 832 HOF-M1520M110 MONTY 1520M CHANGERS HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 9,158.14$ 55.53 4,072.62$ 833 HOF-M1625EM110B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 16,969.18$ 55.53 7,546.19$ 834 HOF-M3550EM110B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 23,668.44$ 55.53 10,525.36$ 835 HOF-M1520110 MONTY 1520M CHANGERS HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 8,677.22$ 55.53 3,858.76$ 836 HOF-M3300110B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 17,305.28$ 55.53 7,695.66$ 837 HOF-M3300110EMB TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 21,227.62$ 55.53 9,439.92$ 838 HOF-M3650230 MONTY 3650 CHANGERS HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 21,124.22$ 55.53 9,393.94$ 839 HOF-M3850230 3850 TRUCK TIRE CHNGR HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 31,655.30$ 55.53 14,077.11$ 840 HOF-M4400220 MONTY 4400 CHANGERS HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 41,855.42$ 55.53 18,613.11$ 841 HOF-MONTY1575B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 12,871.04$ 55.53 5,723.75$ 842 HOF-MONTY1620B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 11,133.52$ 55.53 4,951.08$ 843 HOF-MONTY1625B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 13,230.42$ 55.53 5,883.57$ 844 HOF-MONTY5800B TIRE CHANGER HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 60,673.28$ 55.53 26,981.41$ 845 HOF-SOET9000BL 9K DBL SCISSOR LIFT HOFFMAN EQUIPMENT / SNAP-ON EQUIPMENT USA (FORMELY HOFMANN) 27,327.02$ 55.53 12,152.33$ 846 JET-140771 SLT-330F SCISSOR JET FAB EQUIPMENT / JPW INDUSTRIES 717.86$ 50.72 353.76$ 847 JET-140777 SLT-660F SCISSOR LFT JET FAB EQUIPMENT / JPW INDUSTRIES 883.52$ 50.72 435.40$ 848 JET-140779 SLT-1650 SCISSOR LFT JET FAB EQUIPMENT / JPW INDUSTRIES 1,380.50$ 50.72 680.31$ 849 JET-140780 SLT-1100 SCISSOR LFT JET FAB EQUIPMENT / JPW INDUSTRIES 1,557.66$ 50.72 767.61$ 850 JET-321102AK LATHE W/STAND JET FAB EQUIPMENT / JPW INDUSTRIES 14,982.20$ 50.72 7,383.23$ 851 JET-321155K BD-920W LATHE W/STAND JET FAB EQUIPMENT / JPW INDUSTRIES 4,378.00$ 50.72 2,157.48$ 852 JET-331406 HYDRAULIC PRESS 5T JET FAB EQUIPMENT / JPW INDUSTRIES 2,513.64$ 50.72 1,238.72$ 853 JET-331416 HYDRAULIC PRESS 15T JET FAB EQUIPMENT / JPW INDUSTRIES 4,590.10$ 50.72 2,262.00$ 854 JET-331431 HYDRAULIC PRESS 35T JET FAB EQUIPMENT / JPW INDUSTRIES 7,759.48$ 50.72 3,823.87$ 855 JET-331900 HYDRAULIC PIPE BENDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,290.68$ 50.72 636.05$ 856 JET-331910 HYDRAULIC PIPE BENDER JET FAB EQUIPMENT / JPW INDUSTRIES 2,089.66$ 50.72 1,029.78$ 857 JET-333605 1/2TON ARBOR PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 145.72$ 50.72 71.81$ 858 JET-333610 1 TON ARBOR PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 228.30$ 50.72 112.51$ 859 JET-333620 2 TON ARBOR PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 451.72$ 50.72 222.61$ 860 JET-333630 3 TON ARBOR PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 716.42$ 50.72 353.05$ 861 JET-333650 ARBOR PRESS 5 TON JET FAB EQUIPMENT / JPW INDUSTRIES 2,064.36$ 50.72 1,017.32$ 862 JET-350017 15 MILL/DRILL MACH JET FAB EQUIPMENT / JPW INDUSTRIES 4,128.68$ 50.72 2,034.61$ 863 JET-350018 18 MILL/DRILL MACH JET FAB EQUIPMENT / JPW INDUSTRIES 5,100.12$ 50.72 2,513.34$ 864 JET-350045 CS-18 CABINET STAND JET FAB EQUIPMENT / JPW INDUSTRIES 684.88$ 50.72 337.51$ 865 JET-354170 JDP-20MF DP FLOOR JET FAB EQUIPMENT / JPW INDUSTRIES 2,511.20$ 50.72 1,237.52$ 866 JET-354300 DRILL PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 3,339.70$ 50.72 1,645.80$ 867 JET-354301 DRILL PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 4,177.24$ 50.72 2,058.54$ 868 JET-354400 15" DRILLPRESS JET FAB EQUIPMENT / JPW INDUSTRIES 1,627.20$ 50.72 801.88$ 869 JET-354401 15" BENCH DRILLPRESS JET FAB EQUIPMENT / JPW INDUSTRIES 1,471.74$ 50.72 725.27$ 870 JET-354402 20" DRILLPRESS JET FAB EQUIPMENT / JPW INDUSTRIES 2,848.80$ 50.72 1,403.89$ 871 JET-354500 15" 6 SP DRILLPRESS JET FAB EQUIPMENT / JPW INDUSTRIES 3,703.66$ 50.72 1,825.16$ 872 JET-354550 FLOOR DRILL PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 4,174.80$ 50.72 2,057.34$ 873 JET-413451 7X10-1/2 BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 4,174.82$ 50.72 2,057.35$ 874 JET-413452 7X10.5 BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 4,699.40$ 50.72 2,315.86$ 875 JET-413460 8X12 BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 4,152.96$ 50.72 2,046.58$ 876 JET-414220 BENCH COLD SAW JET FAB EQUIPMENT / JPW INDUSTRIES 2,490.22$ 50.72 1,227.18$ 877 JET-414418 18" MT/WD VERT BDS JET FAB EQUIPMENT / JPW INDUSTRIES 6,557.30$ 50.72 3,231.44$ 878 JET-414457 5X6 HORZL SWIVEL B/S JET FAB EQUIPMENT / JPW INDUSTRIES 1,981.76$ 50.72 976.61$ 879 JET-414458 5X6 HORZ/VERT BNDSW JET FAB EQUIPMENT / JPW INDUSTRIES 1,250.74$ 50.72 616.36$ 880 JET-414459 7X12 HZ/VT BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 2,738.00$ 50.72 1,349.29$ 881 JET-414461 5 X 8 HORIZ BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 2,100.76$ 50.72 1,035.25$ 882 JET-414483 14" VERTICAL BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 9,187.50$ 50.72 4,527.60$ 883 JET-414500K 14" VERT MT/WD BDS JET FAB EQUIPMENT / JPW INDUSTRIES 3,339.36$ 50.72 1,645.64$ 884 JET-414502 BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 4,189.38$ 50.72 2,064.53$ 885 JET-414548 5X6 BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 1,355.18$ 50.72 667.83$ 886 JET-414550K BELT & DISC SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 2,064.32$ 50.72 1,017.30$ 887 JET-414551 BELT & DISC MACH JET FAB EQUIPMENT / JPW INDUSTRIES 3,339.36$ 50.72 1,645.64$ 888 JET-414559 HOR/VERT BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 3,026.06$ 50.72 1,491.24$ 889 JET-414560 DEL HOR/VERT BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 3,198.48$ 50.72 1,576.21$ 890 JET-414602 DISC SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 2,489.34$ 50.72 1,226.75$ 891 JET-414610 3X79 BELT GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 3,545.80$ 50.72 1,747.37$ 892 JET-414700 METAL DUST COLL JET FAB EQUIPMENT / JPW INDUSTRIES 2,720.06$ 50.72 1,340.45$ 893 JET-414705 REPLACEMENT FILTERS JET FAB EQUIPMENT / JPW INDUSTRIES 667.90$ 50.72 329.14$ 894 JET-414800 BENCH GRINDER STAND JET FAB EQUIPMENT / JPW INDUSTRIES 2,086.20$ 50.72 1,028.08$ 895 JET-414812 HEAT RESISTANT HOSE JET FAB EQUIPMENT / JPW INDUSTRIES 140.86$ 50.72 69.42$ 896 JET-414813 HEAT RESISTANT HOSE JET FAB EQUIPMENT / JPW INDUSTRIES 191.86$ 50.72 94.55$ 897 JET-414815 REDUCER SLEEVE JET FAB EQUIPMENT / JPW INDUSTRIES 34.00$ 50.72 16.76$ 898 JET-414820 REDUCER SLEEVE JET FAB EQUIPMENT / JPW INDUSTRIES 36.44$ 50.72 17.96$ 899 JET-414825 REDUCER SLEEVE JET FAB EQUIPMENT / JPW INDUSTRIES 38.86$ 50.72 19.15$ 900 JET-414830 ADAPTER PLATE JET FAB EQUIPMENT / JPW INDUSTRIES 189.42$ 50.72 93.35$ 901 JET-414840 REPLACEMENT FILTER JET FAB EQUIPMENT / JPW INDUSTRIES 667.86$ 50.72 329.12$ 902 JET-415559 HVBS712V VS BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 3,339.36$ 50.72 1,645.64$ 903 JET-415560 HBS712DV DVS BANDSAW JET FAB EQUIPMENT / JPW INDUSTRIES 3,652.66$ 50.72 1,800.03$ 904 JET-441305 SJ-5T SCREW JACK 5T JET FAB EQUIPMENT / JPW INDUSTRIES 98.94$ 50.72 48.76$ 905 JET-441310 SJ-10T SCREW JACK 10T JET FAB EQUIPMENT / JPW INDUSTRIES 204.78$ 50.72 100.92$ 906 JET-441315 SJ-15T SCREW JACK 15T JET FAB EQUIPMENT / JPW INDUSTRIES 234.68$ 50.72 115.65$ 907 JET-441320 SJ-20T SCREW JACK 20T JET FAB EQUIPMENT / JPW INDUSTRIES 283.00$ 50.72 139.46$ 908 JET-441325 SJ-25T SCREW JACK 25T JET FAB EQUIPMENT / JPW INDUSTRIES 352.02$ 50.72 173.48$ 909 JET-453301 JHJ-2 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 80.52$ 50.72 39.68$ 910 JET-453303 JHJ-3 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 98.94$ 50.72 48.76$ 911 JET-453305 JHJ-5 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 133.44$ 50.72 65.76$ 912 JET-453308 JHJ-8 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 151.86$ 50.72 74.84$

Page 50 of 65 ends

7.E

Page 130 of 459 ends

913 JET-453312 JHJ-12-1/2 BOTTLEJACK JET FAB EQUIPMENT / JPW INDUSTRIES 223.18$ 50.72 109.98$ 914 JET-453313K JHJ-12-1/2L HYD JACK JET FAB EQUIPMENT / JPW INDUSTRIES 223.18$ 50.72 109.98$ 915 JET-453322 JHJ-22-1/2 BOTTLEJACK JET FAB EQUIPMENT / JPW INDUSTRIES 312.92$ 50.72 154.21$ 916 JET-453323K JHJ-22-1/2L HYD JACK JET FAB EQUIPMENT / JPW INDUSTRIES 312.92$ 50.72 154.21$ 917 JET-453335K JHJ-35 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 476.26$ 50.72 234.70$ 918 JET-453360K JHJ-60 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 1,256.24$ 50.72 619.08$ 919 JET-453399K JHJ-100 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 5,110.10$ 50.72 2,518.26$ 920 JET-454502 JTJ-2ST 2T TOE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 388.84$ 50.72 191.62$ 921 JET-454505 JTJ-5ST 5T TOE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 662.64$ 50.72 326.55$ 922 JET-454510 JTJ-10ST TOE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 1,035.36$ 50.72 510.23$ 923 JET-456612 AHJ-12 BOTTLEJACK JET FAB EQUIPMENT / JPW INDUSTRIES 462.46$ 50.72 227.90$ 924 JET-456620 AHJ-20 BOTTLE JACK JET FAB EQUIPMENT / JPW INDUSTRIES 584.40$ 50.72 287.99$ 925 JET-577003 BELT & DISC SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 971.46$ 50.72 478.74$ 926 JET-577004 BELT & DISC SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,020.02$ 50.72 502.67$ 927 JET-577013K SANDER W DUST STAND JET FAB EQUIPMENT / JPW INDUSTRIES 3,072.12$ 50.72 1,513.94$ 928 JET-577014K SANDER W DUST STAND JET FAB EQUIPMENT / JPW INDUSTRIES 3,132.36$ 50.72 1,543.63$ 929 JET-577101 6 BENCH GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 410.44$ 50.72 202.26$ 930 JET-577102 8 BENCH GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 556.14$ 50.72 274.07$ 931 JET-577102K BNCH GRINDER & STAND JET FAB EQUIPMENT / JPW INDUSTRIES 782.04$ 50.72 385.39$ 932 JET-577103 10 BENCH GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,029.74$ 50.72 507.46$ 933 JET-577103K BNCH GRINDER & STAND JET FAB EQUIPMENT / JPW INDUSTRIES 1,236.16$ 50.72 609.18$ 934 JET-577107 8 GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,515.46$ 50.72 746.82$ 935 JET-577109 6 GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,136.60$ 50.72 560.12$ 936 JET-577113 MITERING TABLE KIT JET FAB EQUIPMENT / JPW INDUSTRIES 153.02$ 50.72 75.41$ 937 JET-577115 CONTACT WHEEL JET FAB EQUIPMENT / JPW INDUSTRIES 182.14$ 50.72 89.76$ 938 JET-577117 BUFFING COMPOUND JET FAB EQUIPMENT / JPW INDUSTRIES 41.28$ 50.72 20.34$ 939 JET-577119 BELT/DISK START KIT JET FAB EQUIPMENT / JPW INDUSTRIES 206.42$ 50.72 101.72$ 940 JET-577126 JBG-6W2 -JBG-6B 6IN JET FAB EQUIPMENT / JPW INDUSTRIES 449.32$ 50.72 221.42$ 941 JET-577128 JBG-8W2 -JBG-8B 8IN JET FAB EQUIPMENT / JPW INDUSTRIES 595.00$ 50.72 293.22$ 942 JET-577172 JPS-2A PEDESTAL STAND JET FAB EQUIPMENT / JPW INDUSTRIES 313.30$ 50.72 154.39$ 943 JET-577248 IBGB-248VS GRDR/SNDR JET FAB EQUIPMENT / JPW INDUSTRIES 1,420.74$ 50.72 700.14$ 944 JET-577436 IBGB-436VS GRDR/SNDR JET FAB EQUIPMENT / JPW INDUSTRIES 1,649.04$ 50.72 812.65$ 945 JET-578008 BNCH GRINDER & STAND JET FAB EQUIPMENT / JPW INDUSTRIES 680.02$ 50.72 335.11$ 946 JET-578010 IND BENCH GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,214.32$ 50.72 598.42$ 947 JET-578012 IND BENCH GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 2,671.50$ 50.72 1,316.52$ 948 JET-578100 BENCH GRINDER LAMP JET FAB EQUIPMENT / JPW INDUSTRIES 116.58$ 50.72 57.45$ 949 JET-578108K BENCH GRNDR-DUST STD JET FAB EQUIPMENT / JPW INDUSTRIES 2,650.46$ 50.72 1,306.15$ 950 JET-578110K BENCH GRNDR-DUST STD JET FAB EQUIPMENT / JPW INDUSTRIES 3,132.36$ 50.72 1,543.63$ 951 JET-578112K BENCH GRNDR-DUST STD JET FAB EQUIPMENT / JPW INDUSTRIES 4,698.54$ 50.72 2,315.44$ 952 JET-578172 BENCH GRINDER STAND JET FAB EQUIPMENT / JPW INDUSTRIES 388.60$ 50.72 191.50$ 953 JET-578173 BENCH GRINDER STAND JET FAB EQUIPMENT / JPW INDUSTRIES 546.44$ 50.72 269.29$ 954 JET-578208 8IN VS GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 1,029.72$ 50.72 507.45$ 955 JET-578218 8IN VAR/SPEED BUFFER JET FAB EQUIPMENT / JPW INDUSTRIES 813.60$ 50.72 400.94$ 956 JET-578248 IBGB-248 GRDR/SNDR JET FAB EQUIPMENT / JPW INDUSTRIES 1,022.42$ 50.72 503.85$ 957 JET-578436 IBGB-436 GRDR/SNDR JET FAB EQUIPMENT / JPW INDUSTRIES 1,255.60$ 50.72 618.76$ 958 JET-579000 SAW BLADE 225MM JET FAB EQUIPMENT / JPW INDUSTRIES 301.14$ 50.72 148.40$ 959 JET-752116 1648H BOX & PAN BRAKE JET FAB EQUIPMENT / JPW INDUSTRIES 2,678.00$ 50.72 1,319.72$ 960 JET-752125 BOX & PAN BRAKE JET FAB EQUIPMENT / JPW INDUSTRIES 5,491.14$ 50.72 2,706.03$ 961 JET-752127 BOX & PAN BRAKE JET FAB EQUIPMENT / JPW INDUSTRIES 5,702.42$ 50.72 2,810.15$ 962 JET-752652 FS-1652H FOOT SHEAR JET FAB EQUIPMENT / JPW INDUSTRIES 4,738.00$ 50.72 2,334.89$ 963 JET-754017 STAND HND NOTCHER JET FAB EQUIPMENT / JPW INDUSTRIES 631.46$ 50.72 311.18$ 964 JET-754024 STAND FOR 24 SR-2024N JET FAB EQUIPMENT / JPW INDUSTRIES 420.16$ 50.72 207.05$ 965 JET-754030 STAND FOR 30 SBR-30N JET FAB EQUIPMENT / JPW INDUSTRIES 473.58$ 50.72 233.38$ 966 JET-754036 STAND FOR 36 SR-2236N JET FAB EQUIPMENT / JPW INDUSTRIES 619.28$ 50.72 305.18$ 967 JET-754040 STAND FOR 40 SBR-40N JET FAB EQUIPMENT / JPW INDUSTRIES 626.58$ 50.72 308.78$ 968 JET-754051 STAND FOR 50 SR-1650N JET FAB EQUIPMENT / JPW INDUSTRIES 716.46$ 50.72 353.07$ 969 JET-754105 BENCH BOX/PAN BRAKE JET FAB EQUIPMENT / JPW INDUSTRIES 3,234.94$ 50.72 1,594.18$ 970 JET-754110 FLOOR BOX/PAN BRAKE JET FAB EQUIPMENT / JPW INDUSTRIES 9,083.06$ 50.72 4,476.13$ 971 JET-754115 FLOOR BOX/HAND BRAKE JET FAB EQUIPMENT / JPW INDUSTRIES 20,065.34$ 50.72 9,888.20$ 972 JET-754200 STND BOX&PAN BRKS JET FAB EQUIPMENT / JPW INDUSTRIES 837.88$ 50.72 412.91$ 973 JET-756016 BENCH HAND NOTCHER JET FAB EQUIPMENT / JPW INDUSTRIES 1,646.60$ 50.72 811.44$ 974 JET-756020 24 X 20 SLIP ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 1,687.90$ 50.72 831.80$ 975 JET-756026 36 X 22 SLIP ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 1,899.18$ 50.72 935.92$ 976 JET-756027 POWER SLIP ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 9,083.06$ 50.72 4,476.13$ 977 JET-756028 POWER SLIP ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 9,083.06$ 50.72 4,476.13$ 978 JET-756031 SHEAR BRAKE&ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 2,110.48$ 50.72 1,040.04$ 979 JET-756041 SHEAR BRAKE&ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 3,378.22$ 50.72 1,664.79$ 980 JET-756050 50 X 16 SLIP ROLL JET FAB EQUIPMENT / JPW INDUSTRIES 4,721.26$ 50.72 2,326.64$ 981 JET-756121 PLANISHING HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 3,589.52$ 50.72 1,768.92$ 982 JET-756151 ENGLISH WHEEL JET FAB EQUIPMENT / JPW INDUSTRIES 5,491.14$ 50.72 2,706.03$ 983 JET-756202 FOOT SHEAR JET FAB EQUIPMENT / JPW INDUSTRIES 5,702.42$ 50.72 2,810.15$ 984 JET-756203 PNEUMATIC SHEAR JET FAB EQUIPMENT / JPW INDUSTRIES 11,829.86$ 50.72 5,829.76$ 985 JET-4PC540 CLAMPS JET FAB EQUIPMENT / JPW INDUSTRIES 150.66$ 56.39 65.70$ 986 JET-191 656HD WORKSHOP VISE JET FAB EQUIPMENT / JPW INDUSTRIES 527.16$ 56.39 229.89$ 987 JET-10010 ALL TERRAIN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 504.10$ 56.39 219.84$ 988 JET-10025 HITCH TERRAIN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 377.38$ 56.39 164.58$ 989 JET-10025BH 5IN ATV BASH KIT JET FAB EQUIPMENT / JPW INDUSTRIES 416.10$ 56.39 181.46$ 990 JET-10055 ATV RISER 10IN JET FAB EQUIPMENT / JPW INDUSTRIES 158.44$ 56.39 69.10$ 991 JET-10065 LOCKING HITCH PIN JET FAB EQUIPMENT / JPW INDUSTRIES 60.48$ 56.39 26.38$ 992 JET-10200 C0 PIPE & BENCH VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,786.02$ 56.39 778.88$ 993 JET-10225 C1 PIPE & BENCH VISE JET FAB EQUIPMENT / JPW INDUSTRIES 2,578.22$ 56.39 1,124.36$ 994 JET-10250 C2 PIPE & BENCH VISE JET FAB EQUIPMENT / JPW INDUSTRIES 3,341.60$ 56.39 1,457.27$ 995 JET-10275 C3 PIPE /BENCH VISE JET FAB EQUIPMENT / JPW INDUSTRIES 4,897.20$ 56.39 2,135.67$

Page 51 of 65 ends

7.E

Page 131 of 459 ends

996 JET-10300 ATV MOUNTING BRACKET JET FAB EQUIPMENT / JPW INDUSTRIES 63.36$ 56.39 27.63$ 997 JET-10400 AW35 OUTDOOR JET FAB EQUIPMENT / JPW INDUSTRIES 1,872.46$ 56.39 816.58$ 998 JET-10500 AW45 OUTDOOR JET FAB EQUIPMENT / JPW INDUSTRIES 2,650.24$ 56.39 1,155.77$ 999 JET-11104 WILTON 4 BENCH VISE JET FAB EQUIPMENT / JPW INDUSTRIES 146.90$ 56.39 64.06$ 1000 JET-11105 WILTON 5 BENCH VISE" JET FAB EQUIPMENT / JPW INDUSTRIES 239.08$ 56.39 104.26$ 1001 JET-11106 WILTON 6 BENCH VISE" JET FAB EQUIPMENT / JPW INDUSTRIES 328.38$ 56.39 143.21$ 1002 JET-11106S41 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 90.80$ 56.39 39.60$ 1003 JET-11114 C-CLAMP KIT JET FAB EQUIPMENT / JPW INDUSTRIES 184.36$ 56.39 80.40$ 1004 JET-11115 C-CLAMP KIT JET FAB EQUIPMENT / JPW INDUSTRIES 172.84$ 56.39 75.38$ 1005 JET-11116 C-CLAMP KIT JET FAB EQUIPMENT / JPW INDUSTRIES 256.38$ 56.39 111.81$ 1006 JET-11126 VISE WORKSHOP #674 JET FAB EQUIPMENT / JPW INDUSTRIES 234.84$ 56.39 102.41$ 1007 JET-11127 VISE WORKSHOP #675 JET FAB EQUIPMENT / JPW INDUSTRIES 292.84$ 56.39 127.71$ 1008 JET-11127S41 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 74.78$ 56.39 32.61$ 1009 JET-11128 VISE WORKSHOP #676 JET FAB EQUIPMENT / JPW INDUSTRIES 396.52$ 56.39 172.92$ 1010 JET-11128S41 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 78.32$ 56.39 34.16$ 1011 JET-11800 648HD WORKSHOP VISE JET FAB EQUIPMENT / JPW INDUSTRIES 740.34$ 56.39 322.86$ 1012 JET-12860 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 167.08$ 56.39 72.86$ 1013 JET-13401 DRILL PRESS JET FAB EQUIPMENT / JPW INDUSTRIES 354.32$ 56.39 154.52$ 1014 JET-13402 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 622.22$ 56.39 271.35$ 1015 JET-14210 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 20.82$ 56.39 9.08$ 1016 JET-14213 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 22.28$ 56.39 9.72$ 1017 JET-14214 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 34.58$ 56.39 15.08$ 1018 JET-14215 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 34.58$ 56.39 15.08$ 1019 JET-14228 403 C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 43.22$ 56.39 18.85$ 1020 JET-14229 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 46.08$ 56.39 20.10$ 1021 JET-14242 404 C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 66.26$ 56.39 28.90$ 1022 JET-14243 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 69.14$ 56.39 30.15$ 1023 JET-14256 406 C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 100.82$ 56.39 43.97$ 1024 JET-14257 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 106.58$ 56.39 46.48$ 1025 JET-14270 408 C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 129.64$ 56.39 56.54$ 1026 JET-14271 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 132.50$ 56.39 57.78$ 1027 JET-14284 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 175.72$ 56.39 76.63$ 1028 JET-14285 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 190.12$ 56.39 82.91$ 1029 JET-14298 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 279.42$ 56.39 121.86$ 1030 JET-14299 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 299.60$ 56.39 130.66$ 1031 JET-14302 404SF C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 66.26$ 56.39 28.90$ 1032 JET-14303 406SF C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 100.82$ 56.39 43.97$ 1033 JET-14305 408SF C-CLAMP WILTON JET FAB EQUIPMENT / JPW INDUSTRIES 129.64$ 56.39 56.54$ 1034 JET-14500 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 448.38$ 56.39 195.54$ 1035 JET-14500S41 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 63.26$ 56.39 27.59$ 1036 JET-14600 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 535.54$ 56.39 233.55$ 1037 JET-14600S03 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 61.00$ 56.39 26.60$ 1038 JET-14800 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 677.16$ 56.39 295.31$ 1039 JET-14800S03 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 135.24$ 56.39 58.98$ 1040 JET-21300 744A MECHANICSFT VISE JET FAB EQUIPMENT / JPW INDUSTRIES 446.50$ 56.39 194.72$ 1041 JET-21300-03 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 80.46$ 56.39 35.09$ 1042 JET-21400 745 MECHANICSFT VISE JET FAB EQUIPMENT / JPW INDUSTRIES 630.86$ 56.39 275.12$ 1043 JET-21400-03 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 80.46$ 56.39 35.09$ 1044 JET-21500 746 MECHANICSFT VISE JET FAB EQUIPMENT / JPW INDUSTRIES 809.46$ 56.39 353.01$ 1045 JET-21500-03 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 64.38$ 56.39 28.08$ 1046 JET-21500-04 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 34.70$ 56.39 15.13$ 1047 JET-21500A MECHANICS VISE JET FAB EQUIPMENT / JPW INDUSTRIES 380.88$ 56.39 166.10$ 1048 JET-21500K 746MECHVISE&C-CLMP JET FAB EQUIPMENT / JPW INDUSTRIES 548.30$ 56.39 239.11$ 1049 JET-21800 8 MECHANICS VISE 748A JET FAB EQUIPMENT / JPW INDUSTRIES 1,166.64$ 56.39 508.77$ 1050 JET-21800-03 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 111.42$ 56.39 48.59$ 1051 JET-21800-04 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 39.16$ 56.39 17.08$ 1052 JET-22001 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 28.82$ 56.39 12.57$ 1053 JET-22003 540A-4 C-CLAMP-4 IN JET FAB EQUIPMENT / JPW INDUSTRIES 46.08$ 56.39 20.10$ 1054 JET-22004 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 54.72$ 56.39 23.86$ 1055 JET-22005 540A-6 C-CLAMP-6 IN JET FAB EQUIPMENT / JPW INDUSTRIES 69.14$ 56.39 30.15$ 1056 JET-22006 540A-8 C-CLAMP-8IN JET FAB EQUIPMENT / JPW INDUSTRIES 92.18$ 56.39 40.20$ 1057 JET-22007 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 109.46$ 56.39 47.74$ 1058 JET-28801 6.5 XTREME VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,987.68$ 56.39 866.83$ 1059 JET-28802 8 XTREME VISE JET FAB EQUIPMENT / JPW INDUSTRIES 3,067.96$ 56.39 1,337.94$ 1060 JET-28805 1745 TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,037.04$ 56.39 452.25$ 1061 JET-28806 1755 TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,270.36$ 56.39 554.00$ 1062 JET-28807 1765 TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,414.40$ 56.39 616.82$ 1063 JET-28808 1780A TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 2,114.40$ 56.39 922.09$ 1064 JET-28810 845M MECHPRO VISE JET FAB EQUIPMENT / JPW INDUSTRIES 570.36$ 56.39 248.73$ 1065 JET-28811 855M MECHPRO VISE JET FAB EQUIPMENT / JPW INDUSTRIES 746.08$ 56.39 325.37$ 1066 JET-28811DB BASH ATV & SLEDGE JET FAB EQUIPMENT / JPW INDUSTRIES 624.12$ 56.39 272.18$ 1067 JET-28812 865M MECHPRO VISE JET FAB EQUIPMENT / JPW INDUSTRIES 967.90$ 56.39 422.10$ 1068 JET-28813 880M MECHPRO VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,440.34$ 56.39 628.13$ 1069 JET-28814 8100M MECHPRO VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,970.36$ 56.39 859.27$ 1070 JET-28815 656UHD UHD VISE 6.5 JET FAB EQUIPMENT / JPW INDUSTRIES 576.12$ 56.39 251.25$ 1071 JET-28816 648UHD UHD VISE 8 JET FAB EQUIPMENT / JPW INDUSTRIES 809.46$ 56.39 353.01$ 1072 JET-28818 674U UTILITYVISE 4.5 JET FAB EQUIPMENT / JPW INDUSTRIES 256.38$ 56.39 111.81$ 1073 JET-28819 675U UTILITYVISE 5.5 JET FAB EQUIPMENT / JPW INDUSTRIES 316.86$ 56.39 138.18$ 1074 JET-28820 676U UTILITYVISE 6.5 JET FAB EQUIPMENT / JPW INDUSTRIES 432.10$ 56.39 188.44$ 1075 JET-28821 4550R REVERSVISE 5.5 JET FAB EQUIPMENT / JPW INDUSTRIES 486.82$ 56.39 212.30$ 1076 JET-28822 4650R REVERSVISE 6.5 JET FAB EQUIPMENT / JPW INDUSTRIES 613.58$ 56.39 267.58$ 1077 JET-28823 4800R REVERSVISE 8 JET FAB EQUIPMENT / JPW INDUSTRIES 734.58$ 56.39 320.35$ 1078 JET-28824 550P M-P VISE 5.5 JET FAB EQUIPMENT / JPW INDUSTRIES 460.90$ 56.39 201.00$

Page 52 of 65 ends

7.E

Page 132 of 459 ends

1079 JET-28825 1745 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,786.02$ 56.39 778.88$ 1080 JET-28826 1755 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 2,578.16$ 56.39 1,124.34$ 1081 JET-28827 1765 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 3,341.56$ 56.39 1,457.25$ 1082 JET-28828 1780A VISE JET FAB EQUIPMENT / JPW INDUSTRIES 4,897.10$ 56.39 2,135.63$ 1083 JET-28840 1745XC TRADESMAN XC JET FAB EQUIPMENT / JPW INDUSTRIES 1,008.00$ 56.39 439.59$ 1084 JET-28841 1755XC TRADESMAN XC JET FAB EQUIPMENT / JPW INDUSTRIES 1,234.00$ 56.39 538.15$ 1085 JET-28842 1765XC TRADESMAN XC JET FAB EQUIPMENT / JPW INDUSTRIES 1,424.00$ 56.39 621.01$ 1086 JET-28843 1780XC TRADESMAN XC JET FAB EQUIPMENT / JPW INDUSTRIES 2,130.00$ 56.39 928.89$ 1087 JET-28900 WILTON COOLING FAN JET FAB EQUIPMENT / JPW INDUSTRIES 9,727.14$ 56.39 4,242.01$ 1088 JET-33150 FIXED CLAMP-ON VISE JET FAB EQUIPMENT / JPW INDUSTRIES 92.18$ 56.39 40.20$ 1089 JET-41406 #144C CLAMP CARDED JET FAB EQUIPMENT / JPW INDUSTRIES 25.94$ 56.39 11.31$ 1090 JET-41408 #146C CLAMP CARDED JET FAB EQUIPMENT / JPW INDUSTRIES 46.08$ 56.39 20.10$ 1091 JET-41409 #148C CLAMP CARDED JET FAB EQUIPMENT / JPW INDUSTRIES 51.84$ 56.39 22.61$ 1092 JET-42460 2.5X6.25 CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 57.60$ 56.39 25.12$ 1093 JET-42520 2X3.5C-CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 20.16$ 56.39 8.79$ 1094 JET-50005 UTILITY VISE 5.5IN JET FAB EQUIPMENT / JPW INDUSTRIES 99.99$ 56.39 43.61$ 1095 JET-51136 BEAD BREAKING WEDGE JET FAB EQUIPMENT / JPW INDUSTRIES 270.78$ 56.39 118.09$ 1096 JET-63187 VISE W/SWIVEL BASE JET FAB EQUIPMENT / JPW INDUSTRIES 590.52$ 56.39 257.53$ 1097 JET-63199 1745 TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,152.28$ 56.39 502.51$ 1098 JET-63200 1755 TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,411.54$ 56.39 615.57$ 1099 JET-63200A TRADESMAN VISE W/BASH JET FAB EQUIPMENT / JPW INDUSTRIES 813.14$ 56.39 354.61$ 1100 JET-63201 1765 TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 1,570.00$ 56.39 684.68$ 1101 JET-63202 1780A TRADESMAN VISE JET FAB EQUIPMENT / JPW INDUSTRIES 2,347.80$ 56.39 1,023.88$ 1102 JET-63295 SHOE CLAMP MOUNT JET FAB EQUIPMENT / JPW INDUSTRIES 216.06$ 56.39 94.22$ 1103 JET-69997 VISE JET FAB EQUIPMENT / JPW INDUSTRIES 80.66$ 56.39 35.18$ 1104 JET-69999 MULTI-PURPOSE VISE JET FAB EQUIPMENT / JPW INDUSTRIES 420.58$ 56.39 183.41$ 1105 JET-69999S41 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 48.82$ 56.39 21.29$ 1106 JET-76654S41 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 90.22$ 56.39 39.34$ 1107 JET-86130 8 LIGHT DUTY F-CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 100.12$ 56.39 43.66$ 1108 JET-86140 12 LIGHT DUTY F-CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 105.88$ 56.39 46.17$ 1109 JET-86160 24 LIGHT DUTY F-CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 118.12$ 56.39 51.51$ 1110 JET-86300 8 F-CLAMP COPPER JET FAB EQUIPMENT / JPW INDUSTRIES 178.60$ 56.39 77.89$ 1111 JET-86310 12 F-CLAMP COPPER JET FAB EQUIPMENT / JPW INDUSTRIES 190.12$ 56.39 82.91$ 1112 JET-86330 24 F-CLAMP COPPER JET FAB EQUIPMENT / JPW INDUSTRIES 210.30$ 56.39 91.71$ 1113 JET-86700 12 DEEP REACH F-CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 233.32$ 56.39 101.75$ 1114 JET-86820 LC12 12 LEVER CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 148.36$ 56.39 64.70$ 1115 JET-86910 12 J SERIES F-CLAMP JET FAB EQUIPMENT / JPW INDUSTRIES 267.90$ 56.39 116.83$ 1116 JET-140018 RESIN CART JET FAB EQUIPMENT / JPW INDUSTRIES 357.20$ 56.39 155.77$ 1117 JET-140019 SERVICE CART JET FAB EQUIPMENT / JPW INDUSTRIES 409.04$ 56.39 178.38$ 1118 JET-140024 SERVICE CART JET FAB EQUIPMENT / JPW INDUSTRIES 193.98$ 56.39 84.59$ 1119 JET-140778 SCISSOR LIFT JET FAB EQUIPMENT / JPW INDUSTRIES 1,544.02$ 56.39 673.35$ 1120 JET-151009 PALLET JACK JET FAB EQUIPMENT / JPW INDUSTRIES 1,114.80$ 56.39 486.16$ 1121 JET-187615 LEVER HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 993.86$ 56.39 433.42$ 1122 JET-414300 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 204.54$ 56.39 89.20$ 1123 JET-414301 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 45.38$ 56.39 19.79$ 1124 JET-414304 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 204.54$ 56.39 89.20$ 1125 JET-418466 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 278.70$ 56.39 121.54$ 1126 JET-418467 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 278.70$ 56.39 121.54$ 1127 JET-418468 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 278.70$ 56.39 121.54$ 1128 JET-418469 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 278.70$ 56.39 121.54$ 1129 JET-418474 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 196.90$ 56.39 85.87$ 1130 JET-418475 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 196.90$ 56.39 85.87$ 1131 JET-418476 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 157.52$ 56.39 68.69$ 1132 JET-418477 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 157.52$ 56.39 68.69$ 1133 JET-418478 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 293.86$ 56.39 128.15$ 1134 JET-418479 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 293.86$ 56.39 128.15$ 1135 JET-418496 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 257.50$ 56.39 112.30$ 1136 JET-418497 BLADE JET FAB EQUIPMENT / JPW INDUSTRIES 257.50$ 56.39 112.30$ 1137 JET-587718 BC-18B BOLT CUTTER JET FAB EQUIPMENT / JPW INDUSTRIES 63.36$ 56.39 27.63$ 1138 JET-587724 BC-24B BOLT CUTTER JET FAB EQUIPMENT / JPW INDUSTRIES 77.78$ 56.39 33.92$ 1139 JET-1191656A JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 69.32$ 56.39 30.23$ 1140 JET-2900770 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 232.74$ 56.39 101.50$ 1141 JET-2900830 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 271.74$ 56.39 118.51$ 1142 JET-2903240 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 203.38$ 56.39 88.69$ 1143 JET-2904130 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 81.20$ 56.39 35.41$ 1144 JET-2904200 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 67.80$ 56.39 29.57$ 1145 JET-2904960 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 193.74$ 56.39 84.49$ 1146 JET-2905000 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 205.12$ 56.39 89.45$ 1147 JET-2907370 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 220.46$ 56.39 96.14$ 1148 JET-2907600 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 302.46$ 56.39 131.90$ 1149 JET-2908050 PIPE JAWS JET FAB EQUIPMENT / JPW INDUSTRIES 179.16$ 56.39 78.13$ 1150 JET-2908060 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 81.36$ 56.39 35.48$ 1151 JET-2908070 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 108.48$ 56.39 47.31$ 1152 JET-2908080 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 149.16$ 56.39 65.05$ 1153 JET-2908100 JAW INSERTS JET FAB EQUIPMENT / JPW INDUSTRIES 189.84$ 56.39 82.79$ 1154 JET-5054013 JAT-401 3INBOX GRINDR JET FAB EQUIPMENT / JPW INDUSTRIES 325.50$ 56.39 141.95$ 1155 JET-ATVBUNDLE 6IN ATV BUNDLE JET FAB EQUIPMENT / JPW INDUSTRIES 627.98$ 56.39 273.86$ 1156 JET-3PCBASH BASH KIT JET FAB EQUIPMENT / JPW INDUSTRIES 291.30$ 54.78 131.73$ 1157 JET-11108 8PC BASH KIT JET FAB EQUIPMENT / JPW INDUSTRIES 622.32$ 54.78 281.41$ 1158 JET-11109 BASH 6P MAST/HAMMR KT JET FAB EQUIPMENT / JPW INDUSTRIES 429.02$ 54.78 194.00$ 1159 JET-11110 BASH 3PC BALL PEIN KT JET FAB EQUIPMENT / JPW INDUSTRIES 211.86$ 54.78 95.80$ 1160 JET-11111 MECHANICS HAMMER KIT JET FAB EQUIPMENT / JPW INDUSTRIES 211.86$ 54.78 95.80$ 1161 JET-11112 SHOP HAMMER KIT JET FAB EQUIPMENT / JPW INDUSTRIES 251.60$ 54.78 113.77$

Page 53 of 65 ends

7.E

Page 133 of 459 ends

1162 JET-11113 DEAD BLOW HAMMER KIT JET FAB EQUIPMENT / JPW INDUSTRIES 251.60$ 54.78 113.77$ 1163 JET-11128BH VISE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 317.78$ 54.78 143.70$ 1164 JET-20212 2-1/2/12 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 84.74$ 54.78 38.32$ 1165 JET-20412 4LB/12 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 95.34$ 54.78 43.11$ 1166 JET-20416 4LB/16 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 111.22$ 54.78 50.29$ 1167 JET-20424 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 132.40$ 54.78 59.87$ 1168 JET-20616 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 137.72$ 54.78 62.28$ 1169 JET-20624 6LB/ 24 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 150.96$ 54.78 68.26$ 1170 JET-20630 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 158.90$ 54.78 71.85$ 1171 JET-20636 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 169.48$ 54.78 76.64$ 1172 JET-20816 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 161.54$ 54.78 73.05$ 1173 JET-20824 8LB/24 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 174.80$ 54.78 79.04$ 1174 JET-20830 8LB/30 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 185.38$ 54.78 83.83$ 1175 JET-20836 8LB/36 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 195.98$ 54.78 88.62$ 1176 JET-21016 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 190.66$ 54.78 86.22$ 1177 JET-21024 10LB/24 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 203.90$ 54.78 92.20$ 1178 JET-21030 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 217.14$ 54.78 98.19$ 1179 JET-21036 10LB/36 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 227.74$ 54.78 102.98$ 1180 JET-21224 12LB/24 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 235.70$ 54.78 106.58$ 1181 JET-21230 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 246.28$ 54.78 111.37$ 1182 JET-21236 12LB/36 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 256.88$ 54.78 116.16$ 1183 JET-21424 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 259.54$ 54.78 117.36$ 1184 JET-21430 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 267.46$ 54.78 120.95$ 1185 JET-21436 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 278.06$ 54.78 125.74$ 1186 JET-22024 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 362.80$ 54.78 164.06$ 1187 JET-22030 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 376.04$ 54.78 170.05$ 1188 JET-22036 SLEDGE HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 389.28$ 54.78 176.03$ 1189 JET-30216 2LB/16 CROSS PEIN JET FAB EQUIPMENT / JPW INDUSTRIES 84.74$ 54.78 38.32$ 1190 JET-30316 3LB/16 CROSS PEIN JET FAB EQUIPMENT / JPW INDUSTRIES 103.30$ 54.78 46.71$ 1191 JET-31036 SPIKE MAUL JET FAB EQUIPMENT / JPW INDUSTRIES 333.68$ 54.78 150.89$ 1192 JET-32414 24OZ/14 BALL PEIN JET FAB EQUIPMENT / JPW INDUSTRIES 74.16$ 54.78 33.54$ 1193 JET-33214 32OZ/14 BALL PEIN JET FAB EQUIPMENT / JPW INDUSTRIES 84.74$ 54.78 38.32$ 1194 JET-34014 40OZ/14 BALL PEIN JET FAB EQUIPMENT / JPW INDUSTRIES 95.34$ 54.78 43.11$ 1195 JET-40212 2-1/2LB/12 HAM30HRC JET FAB EQUIPMENT / JPW INDUSTRIES 84.74$ 54.78 38.32$ 1196 JET-40412 4LB/12 HAMMER30HRC JET FAB EQUIPMENT / JPW INDUSTRIES 95.34$ 54.78 43.11$ 1197 JET-40416 4LB/16 HAMMER30HRC JET FAB EQUIPMENT / JPW INDUSTRIES 111.22$ 54.78 50.29$ 1198 JET-50630 SPLITTING MAUL JET FAB EQUIPMENT / JPW INDUSTRIES 143.00$ 54.78 64.66$ 1199 JET-50636 SPLITTING MAUL JET FAB EQUIPMENT / JPW INDUSTRIES 188.04$ 54.78 85.03$ 1200 JET-50830 SPLITTING MAUL JET FAB EQUIPMENT / JPW INDUSTRIES 164.20$ 54.78 74.25$ 1201 JET-50836 SPLITTING MAUL JET FAB EQUIPMENT / JPW INDUSTRIES 225.12$ 54.78 101.80$ 1202 JET-55114 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 74.16$ 54.78 33.54$ 1203 JET-55214 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 82.08$ 54.78 37.12$ 1204 JET-55314 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 92.68$ 54.78 41.91$ 1205 JET-55416 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 129.76$ 54.78 58.68$ 1206 JET-55830 HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 185.38$ 54.78 83.83$ 1207 JET-90212 2-1/2LB/12 BRASS HAM JET FAB EQUIPMENT / JPW INDUSTRIES 172.14$ 54.78 77.84$ 1208 JET-90412 4LB/12 BRASS HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 225.12$ 54.78 101.80$ 1209 JET-90416 4LB/16 BRASS HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 251.60$ 54.78 113.77$ 1210 JET-90616 6LB/16 BRASS HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 331.04$ 54.78 149.70$ 1211 JET-101910 1T CHN HST 10FT LIFT JET FAB EQUIPMENT / JPW INDUSTRIES 394.80$ 56.83 170.44$ 1212 JET-101930 2T CHN HST 10FT LIFT JET FAB EQUIPMENT / JPW INDUSTRIES 650.26$ 56.83 280.72$ 1213 JET-181205 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 444.18$ 56.83 191.75$ 1214 JET-181210 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 499.30$ 56.83 215.55$ 1215 JET-181215 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 554.48$ 56.83 239.37$ 1216 JET-181505 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 467.40$ 56.83 201.78$ 1217 JET-181510 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 534.16$ 56.83 230.60$ 1218 JET-181515 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 589.32$ 56.83 254.41$ 1219 JET-187505 1/2T MINI-PULLER 5FT JET FAB EQUIPMENT / JPW INDUSTRIES 303.28$ 56.83 130.93$ 1220 JET-187506 1/2T MINI-PULLER 10FT JET FAB EQUIPMENT / JPW INDUSTRIES 368.00$ 56.83 158.87$ 1221 JET-187607 3/4T LVR HST 10F LIFT JET FAB EQUIPMENT / JPW INDUSTRIES 518.00$ 56.83 223.62$ 1222 JET-187611 1-1/2T LVR HST 10FT JET FAB EQUIPMENT / JPW INDUSTRIES 648.00$ 56.83 279.74$ 1223 JET-187740 1/4T MINI-PULLER 5FT JET FAB EQUIPMENT / JPW INDUSTRIES 218.00$ 56.83 94.11$ 1224 JET-187741 1/4T MINI-PULLER 10FT JET FAB EQUIPMENT / JPW INDUSTRIES 303.28$ 56.83 130.93$ 1225 JET-210010 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 664.34$ 56.83 286.80$ 1226 JET-210015 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 736.56$ 56.83 317.97$ 1227 JET-215010 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 794.34$ 56.83 342.92$ 1228 JET-215015 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 852.12$ 56.83 367.86$ 1229 JET-215020 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 953.20$ 56.83 411.50$ 1230 JET-230010 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 1,256.50$ 56.83 542.43$ 1231 JET-235010 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 924.34$ 56.83 399.04$ 1232 JET-235015 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 1,010.98$ 56.83 436.44$ 1233 JET-287100 MINI PULLER JET FAB EQUIPMENT / JPW INDUSTRIES 281.56$ 56.83 121.55$ 1234 JET-287101 JLP-025A-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 345.46$ 56.83 149.14$ 1235 JET-287200 JLP-300A-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 354.16$ 56.83 152.89$ 1236 JET-287201 MINI PULLER JET FAB EQUIPMENT / JPW INDUSTRIES 426.76$ 56.83 184.23$ 1237 JET-287301 LEVER HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 548.68$ 56.83 236.87$ 1238 JET-287401 LEVER HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 661.88$ 56.83 285.73$ 1239 JET-287501 JLP-050A-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 911.56$ 56.83 393.52$ 1240 JET-310010 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 808.78$ 56.83 349.15$ 1241 JET-375005 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 722.14$ 56.83 311.75$ 1242 JET-375010 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 779.90$ 56.83 336.68$ 1243 JET-375015 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 823.24$ 56.83 355.39$ 1244 JET-375020 HOIST JET FAB EQUIPMENT / JPW INDUSTRIES 881.00$ 56.83 380.33$

Page 54 of 65 ends

7.E

Page 134 of 459 ends

1245 JET-376100 JLH-75WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 705.44$ 56.83 304.54$ 1246 JET-376101 JLH-75WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 757.68$ 56.83 327.09$ 1247 JET-376102 JLH-75WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 818.66$ 56.83 353.42$ 1248 JET-376103 JLH-75WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 868.00$ 56.83 374.72$ 1249 JET-376200 JLH-100WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 743.16$ 56.83 320.82$ 1250 JET-376201 JLH-100WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 783.80$ 56.83 338.37$ 1251 JET-376202 JLH-100WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 844.76$ 56.83 364.68$ 1252 JET-376203 JLH-100WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 905.74$ 56.83 391.01$ 1253 JET-376300 JLH-150WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 905.74$ 56.83 391.01$ 1254 JET-376301 JLH-150WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 958.02$ 56.83 413.58$ 1255 JET-376302 JLH-150WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,004.46$ 56.83 433.63$ 1256 JET-376303 JLH-150WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,068.32$ 56.83 461.19$ 1257 JET-376400 JLH-300WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,245.38$ 56.83 537.63$ 1258 JET-376401 JLH-300WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,332.48$ 56.83 575.23$ 1259 JET-376402 JLH-300WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,431.18$ 56.83 617.84$ 1260 JET-376403 JLH-300WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,556.04$ 56.83 671.74$ 1261 JET-376500 JLH-600WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,405.04$ 56.83 606.56$ 1262 JET-376501 JLH-600WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,497.98$ 56.83 646.68$ 1263 JET-376502 JLH-600WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,599.56$ 56.83 690.53$ 1264 JET-376503 JLH-600WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,701.16$ 56.83 734.39$ 1265 JET-376600 JLH-150-5PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 2,177.28$ 56.83 939.93$ 1266 JET-376601 JLH-150-10PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 2,380.46$ 56.83 1,027.64$ 1267 JET-376602 JLH-150-15PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 2,551.78$ 56.83 1,101.60$ 1268 JET-376603 JLH-150-20PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 2,775.26$ 56.83 1,198.08$ 1269 JET-376700 JLH-300-5PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 3,771.02$ 56.83 1,627.95$ 1270 JET-376701 JLH-300-10PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 4,133.90$ 56.83 1,784.60$ 1271 JET-376702 JLH-300-15PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 4,586.74$ 56.83 1,980.10$ 1272 JET-376703 JLH-300-20PSHLVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 4,926.40$ 56.83 2,126.73$ 1273 JET-376800 JLH-250WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 905.74$ 56.83 391.01$ 1274 JET-376801 JLH-250WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 958.02$ 56.83 413.58$ 1275 JET-376802 JLH-250WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,021.88$ 56.83 441.15$ 1276 JET-376803 JLH-250WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,068.32$ 56.83 461.19$ 1277 JET-376900 JLH-900WO-5LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,393.44$ 56.83 601.55$ 1278 JET-376901 JLH-900WO-10LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,497.98$ 56.83 646.68$ 1279 JET-376902 JLH-900WO-15LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,599.56$ 56.83 690.53$ 1280 JET-376903 JLH-900WO-20LVR HST JET FAB EQUIPMENT / JPW INDUSTRIES 1,709.86$ 56.83 738.15$ 1281 JET-426237 PHR50 POLY HOSE REEL JET FAB EQUIPMENT / JPW INDUSTRIES 374.70$ 55.28 167.57$ 1282 JET-426238 AHR50 STEEL HOSE REEL JET FAB EQUIPMENT / JPW INDUSTRIES 659.46$ 55.28 294.91$ 1283 JET-505100 BUTTERFLY IMP/WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 145.20$ 55.28 64.93$ 1284 JET-505101 3/8IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 392.32$ 55.28 175.45$ 1285 JET-505102 1/2IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 183.40$ 55.28 82.02$ 1286 JET-505103 1/2IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 229.28$ 55.28 102.53$ 1287 JET-505104 1/2IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 298.06$ 55.28 133.29$ 1288 JET-505104K IMPACT WRENCH KIT JET FAB EQUIPMENT / JPW INDUSTRIES 514.60$ 55.28 230.13$ 1289 JET-505105 3/4IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 705.64$ 55.28 315.56$ 1290 JET-505106 3/8IN COMP IMP/WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 229.28$ 55.28 102.53$ 1291 JET-505107 1/2IN COMP IMP/WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 229.28$ 55.28 102.53$ 1292 JET-505120 3/8IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 336.26$ 55.28 150.38$ 1293 JET-505121 1/2IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 504.90$ 55.28 225.79$ 1294 JET-505121K IMPACT WRENCH KIT JET FAB EQUIPMENT / JPW INDUSTRIES 621.60$ 55.28 277.98$ 1295 JET-505122 1/2IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 315.90$ 55.28 141.27$ 1296 JET-505123 3/4IN IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 871.24$ 55.28 389.62$ 1297 JET-505124 IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 468.74$ 55.28 209.62$ 1298 JET-505200 IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 896.72$ 55.28 401.01$ 1299 JET-505201 IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 1,762.86$ 55.28 788.35$ 1300 JET-505202 IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 1,893.46$ 55.28 846.76$ 1301 JET-505206 JAT-206 IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 1,019.00$ 55.28 455.70$ 1302 JET-505300 1/4IN STUBBY RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 135.02$ 55.28 60.38$ 1303 JET-505301 3/8IN RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 152.86$ 55.28 68.36$ 1304 JET-505302 1/2IN RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 152.86$ 55.28 68.36$ 1305 JET-505310 1/4IN MINI RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 211.44$ 55.28 94.56$ 1306 JET-505312 3/8IN RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 315.90$ 55.28 141.27$ 1307 JET-505313 1/2IN RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 298.06$ 55.28 133.29$ 1308 JET-505320 1/4IN STUBBY RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 303.16$ 55.28 135.57$ 1309 JET-505321 3/8IN STUBBY RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 303.16$ 55.28 135.57$ 1310 JET-505322 3/8IN IMPACT RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 354.10$ 55.28 158.35$ 1311 JET-505323 1/2IN IMPACT RATCHET JET FAB EQUIPMENT / JPW INDUSTRIES 354.10$ 55.28 158.35$ 1312 JET-505400 MICRO DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 229.28$ 55.28 102.53$ 1313 JET-505401 1/4IN DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 94.26$ 55.28 42.15$ 1314 JET-505402 EXTENDED DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 191.06$ 55.28 85.44$ 1315 JET-505403 RIG/ANGLE DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 114.66$ 55.28 51.28$ 1316 JET-505404 1/4IN DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 203.80$ 55.28 91.14$ 1317 JET-505404K GRINDER KIT JET FAB EQUIPMENT / JPW INDUSTRIES 249.66$ 55.28 111.65$ 1318 JET-505405 RIG/ANGLE DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 229.28$ 55.28 102.53$ 1319 JET-505405K GRINDER KIT JET FAB EQUIPMENT / JPW INDUSTRIES 277.68$ 55.28 124.18$ 1320 JET-505406 ANGLED DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 229.28$ 55.28 102.53$ 1321 JET-505407 EXTENDED DIE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 242.02$ 55.28 108.23$ 1322 JET-505410 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 114.40$ 55.28 51.16$ 1323 JET-505412 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 169.40$ 55.28 75.76$ 1324 JET-505413 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 55.99$ 55.28 25.04$ 1325 JET-505414 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 82.99$ 55.28 37.11$ 1326 JET-505415 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 76.99$ 55.28 34.43$ 1327 JET-505416 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 92.99$ 55.28 41.59$

Page 55 of 65 ends

7.E

Page 135 of 459 ends

1328 JET-505417 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 119.90$ 55.28 53.62$ 1329 JET-505418 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 84.99$ 55.28 38.01$ 1330 JET-505419 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 64.00$ 55.28 28.62$ 1331 JET-505420 MINI DIE GRINDER PACK JET FAB EQUIPMENT / JPW INDUSTRIES 168.16$ 55.28 75.20$ 1332 JET-505434 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 146.99$ 55.28 65.73$ 1333 JET-505450 4IN ANGLE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 468.76$ 55.28 209.63$ 1334 JET-505451 5IN ANGLE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 489.12$ 55.28 218.73$ 1335 JET-505452 7IN ANGLE GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 621.60$ 55.28 277.98$ 1336 JET-505464 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 399.99$ 55.28 178.88$ 1337 JET-505465 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 410.99$ 55.28 183.79$ 1338 JET-505467 AIR GRINDER JET FAB EQUIPMENT / JPW INDUSTRIES 697.40$ 55.28 311.88$ 1339 JET-505480 JAT-480 1 HP R12 JET FAB EQUIPMENT / JPW INDUSTRIES 277.68$ 55.28 124.18$ 1340 JET-505481 JAT-481 1 HP R12 JET FAB EQUIPMENT / JPW INDUSTRIES 343.90$ 55.28 153.79$ 1341 JET-505482 JAT-482 1 HP R12 JET FAB EQUIPMENT / JPW INDUSTRIES 361.76$ 55.28 161.78$ 1342 JET-505483 IND AIR TOOL JET FAB EQUIPMENT / JPW INDUSTRIES 527.34$ 55.28 235.83$ 1343 JET-505500 JAT500 HVLP SPRAY GUN JET FAB EQUIPMENT / JPW INDUSTRIES 315.90$ 55.28 141.27$ 1344 JET-505501 HVLP MINI SPRAY GUN JET FAB EQUIPMENT / JPW INDUSTRIES 249.66$ 55.28 111.65$ 1345 JET-505590 ALUMINUM CUP JET FAB EQUIPMENT / JPW INDUSTRIES 50.84$ 55.28 22.74$ 1346 JET-505591 1.4MM NOZZLE KIT JET FAB EQUIPMENT / JPW INDUSTRIES 104.46$ 55.28 46.71$ 1347 JET-505592 1.7MM NOZZLE KIT JET FAB EQUIPMENT / JPW INDUSTRIES 104.46$ 55.28 46.71$ 1348 JET-505593 2.1MM NOZZLE KIT JET FAB EQUIPMENT / JPW INDUSTRIES 104.46$ 55.28 46.71$ 1349 JET-505594 0.8MM NOZZLE KIT JET FAB EQUIPMENT / JPW INDUSTRIES 104.46$ 55.28 46.71$ 1350 JET-505595 0.5MM NOZZLE KIT JET FAB EQUIPMENT / JPW INDUSTRIES 104.46$ 55.28 46.71$ 1351 JET-505596 SPRAY GUN CLEANING KT JET FAB EQUIPMENT / JPW INDUSTRIES 40.78$ 55.28 18.24$ 1352 JET-505600 REVERSIBLE AIR DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 201.24$ 55.28 89.99$ 1353 JET-505601 REVERSIBLE AIR DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 221.64$ 55.28 99.12$ 1354 JET-505610 REVERSIBLE AIR DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 298.06$ 55.28 133.29$ 1355 JET-505611 REVERSIBLE AIR DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 394.86$ 55.28 176.58$ 1356 JET-505620 REVERSIBLE AIR DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 298.06$ 55.28 133.29$ 1357 JET-505621 REVERSIBLE AIR DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 448.36$ 55.28 200.51$ 1358 JET-505630 REVERSIBL ANGLE DRILL JET FAB EQUIPMENT / JPW INDUSTRIES 315.90$ 55.28 141.27$ 1359 JET-505650 1/4IN SCREWDRIVER JET FAB EQUIPMENT / JPW INDUSTRIES 305.70$ 55.28 136.71$ 1360 JET-505651 1/4IN SCREWDRIVER JET FAB EQUIPMENT / JPW INDUSTRIES 315.90$ 55.28 141.27$ 1361 JET-505660 1/4IN SCREWDRIVER JET FAB EQUIPMENT / JPW INDUSTRIES 343.90$ 55.28 153.79$ 1362 JET-505661 1/4IN SCREWDRIVER JET FAB EQUIPMENT / JPW INDUSTRIES 343.90$ 55.28 153.79$ 1363 JET-505700 HIGH SPEED SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 124.82$ 55.28 55.82$ 1364 JET-505710 ORBITL/JITTERB SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 198.70$ 55.28 88.86$ 1365 JET-505720 DUAL ACTION SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 152.86$ 55.28 68.36$ 1366 JET-505730 RO PALM SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 285.32$ 55.28 127.60$ 1367 JET-505731 RO PALM SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 259.86$ 55.28 116.21$ 1368 JET-505740 7IN ANGLE SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 336.26$ 55.28 150.38$ 1369 JET-505741 7IN ANGLE POLISHER JET FAB EQUIPMENT / JPW INDUSTRIES 392.32$ 55.28 175.45$ 1370 JET-505750 MINI BELT SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 448.36$ 55.28 200.51$ 1371 JET-505751 MINI BELT SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 631.80$ 55.28 282.54$ 1372 JET-505752 MINI BELT SANDER JET FAB EQUIPMENT / JPW INDUSTRIES 486.56$ 55.28 217.59$ 1373 JET-505800 NEEDLE SCALER JET FAB EQUIPMENT / JPW INDUSTRIES 382.12$ 55.28 170.88$ 1374 JET-505801 NEEDLE SCALER JET FAB EQUIPMENT / JPW INDUSTRIES 534.98$ 55.28 239.24$ 1375 JET-505820 FLUX CHIPPER JET FAB EQUIPMENT / JPW INDUSTRIES 394.86$ 55.28 176.58$ 1376 JET-505821 FLUX CHIPPER JET FAB EQUIPMENT / JPW INDUSTRIES 343.90$ 55.28 153.79$ 1377 JET-505900 STROKE-SHT/AIR HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 104.46$ 55.28 46.71$ 1378 JET-505901 STROKE-MED AIR HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 119.72$ 55.28 53.54$ 1379 JET-505902 STROKE-LNG/AIR HAMMER JET FAB EQUIPMENT / JPW INDUSTRIES 132.46$ 55.28 59.24$ 1380 JET-505910 JAT-910 METAL SHEAR JET FAB EQUIPMENT / JPW INDUSTRIES 236.92$ 55.28 105.95$ 1381 JET-505920 JAT-920 RIVETER JET FAB EQUIPMENT / JPW INDUSTRIES 290.42$ 55.28 129.88$ 1382 JET-505930 JAT-930 CUT-OFF TOOL JET FAB EQUIPMENT / JPW INDUSTRIES 132.46$ 55.28 59.24$ 1383 JET-505955 IMPACT WRENCH JET FAB EQUIPMENT / JPW INDUSTRIES 6,190.42$ 55.28 2,768.36$ 1384 JET-5051672 JAT106/107 COMPCT/BUN JET FAB EQUIPMENT / JPW INDUSTRIES 675.10$ 55.28 301.90$ 1385 JET-5057510 JAT750 SANDER W/BELTS JET FAB EQUIPMENT / JPW INDUSTRIES 433.08$ 55.28 193.67$ 1386 JET-JAF12 JAF12 1/2IN AIR FILTR JET FAB EQUIPMENT / JPW INDUSTRIES 56.04$ 55.28 25.06$ 1387 JET-JAF14 JAF14 1/4IN AIR FILTR JET FAB EQUIPMENT / JPW INDUSTRIES 48.40$ 55.28 21.64$ 1388 JET-JAF38 JAF38 3/8IN AIR FILTR JET FAB EQUIPMENT / JPW INDUSTRIES 48.40$ 55.28 21.64$ 1389 JET-JAH3825 JAH3825 3/8IN AIR HSE JET FAB EQUIPMENT / JPW INDUSTRIES 48.40$ 55.28 21.64$ 1390 JET-JAH3850 JAH3850 3/8IN AIR HSE JET FAB EQUIPMENT / JPW INDUSTRIES 84.06$ 55.28 37.59$ 1391 JET-JAR12 JAR12 1/2IN AIR REGUL JET FAB EQUIPMENT / JPW INDUSTRIES 50.94$ 55.28 22.78$ 1392 JET-JAR14 JAR14 1/4IN AIR REGUL JET FAB EQUIPMENT / JPW INDUSTRIES 48.40$ 55.28 21.64$ 1393 JET-JAR38 JAR338 3/8IN AIR REGL JET FAB EQUIPMENT / JPW INDUSTRIES 48.40$ 55.28 21.64$ 1394 JET-JAS12 JAS12 AIR SWVL 1/2IN JET FAB EQUIPMENT / JPW INDUSTRIES 17.84$ 55.28 7.98$ 1395 JET-JAS14 JAS14 AIR SWVL 1/4IN JET FAB EQUIPMENT / JPW INDUSTRIES 17.84$ 55.28 7.98$ 1396 JET-JAS38 JAS38 AIR SWVL 3/8IN JET FAB EQUIPMENT / JPW INDUSTRIES 33.10$ 55.28 14.80$ 1397 JET-JAT750-62 SANDING BELT JET FAB EQUIPMENT / JPW INDUSTRIES 11.24$ 55.28 5.03$ 1398 JET-JAT751-49 SANDING BELT JET FAB EQUIPMENT / JPW INDUSTRIES 10.34$ 55.28 4.62$ 1399 JET-JAT752-59 SANDING BELT JET FAB EQUIPMENT / JPW INDUSTRIES 9.46$ 55.28 4.23$ 1400 JET-JFR12 JFR12 1/2IN AIR FL/RG JET FAB EQUIPMENT / JPW INDUSTRIES 114.62$ 55.28 51.26$ 1401 JET-JFR14 JRF14 1/4IN AIR FL/RG JET FAB EQUIPMENT / JPW INDUSTRIES 99.36$ 55.28 44.43$ 1402 JET-JFR38 JFR38 3/8IN AIR FL/RG JET FAB EQUIPMENT / JPW INDUSTRIES 107.02$ 55.28 47.86$ 1403 JET-JFRL12 JFRL12 AIR FIL/RG/LUB JET FAB EQUIPMENT / JPW INDUSTRIES 244.56$ 55.28 109.37$ 1404 JET-JFRL14 JFRL14 AIR FIL/RG/LUB JET FAB EQUIPMENT / JPW INDUSTRIES 132.46$ 55.28 59.24$ 1405 JET-JFRL38 JFRL38 AIR FIL/RG/LUB JET FAB EQUIPMENT / JPW INDUSTRIES 226.74$ 55.28 101.40$ 1406 JET-JSG1063 JSG1063 AIR BLOW GUN JET FAB EQUIPMENT / JPW INDUSTRIES 17.84$ 55.28 7.98$ 1407 JET-JSG2008 JSG2008 QUICK COUPLER JET FAB EQUIPMENT / JPW INDUSTRIES 27.02$ 55.28 12.08$ 1408 JET-N307 19P 3MM X 7IN NEEDLES JET FAB EQUIPMENT / JPW INDUSTRIES 43.30$ 55.28 19.36$ 1409 JET-N407 14P 4MM X 7IN NEEDLES JET FAB EQUIPMENT / JPW INDUSTRIES 43.30$ 55.28 19.36$ 1410 JET-NS25 NEEDLE SCALER ATTACHM JET FAB EQUIPMENT / JPW INDUSTRIES 198.70$ 55.28 88.86$

Page 56 of 65 ends

7.E

Page 136 of 459 ends

1411 JET-506601 AIR COMPRESSOR JET FAB EQUIPMENT / JPW INDUSTRIES 2,006.38$ 52.44 954.23$ 1412 JET-506801 AIR COMPRESSOR JET FAB EQUIPMENT / JPW INDUSTRIES 4,291.62$ 52.44 2,041.09$ 1413 JET-506803 AIR COMPRESSOR JET FAB EQUIPMENT / JPW INDUSTRIES 6,270.78$ 52.44 2,982.38$ 1414 JET-506804 AIR COMPRESSOR JET FAB EQUIPMENT / JPW INDUSTRIES 6,270.78$ 52.44 2,982.38$ 1415 NAC-82-0010 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,163.22$ 52.08 1,036.62$ 1416 NAC-82-0015 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,474.00$ 52.08 1,185.54$ 1417 NAC-82-0025 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,799.52$ 52.08 1,341.53$ 1418 NAC-82-0040 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,995.14$ 52.08 1,435.27$ 1419 NAC-82-0150 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,229.76$ 52.08 2,026.90$ 1420 NAC-82-0160 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,685.20$ 52.08 2,245.15$ 1421 NAC-82-0175 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,046.60$ 52.08 2,897.53$ 1422 NAC-82-0220 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,649.80$ 52.08 1,748.98$ 1423 NAC-82-0240 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,902.76$ 52.08 2,349.40$ 1424 NAC-82-0250 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,814.16$ 52.08 2,786.15$ 1425 NAC-82-0275 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,113.00$ 52.08 3,408.55$ 1426 NAC-82-308HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,063.28$ 52.08 2,905.52$ 1427 NAC-82-308HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,999.44$ 52.08 2,874.93$ 1428 NAC-82-308VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,116.48$ 52.08 2,931.02$ 1429 NAC-82-308VBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,116.60$ 52.08 2,931.07$ 1430 NAC-82-309HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,735.02$ 52.08 3,227.42$ 1431 NAC-82-309HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,735.02$ 52.08 3,227.42$ 1432 NAC-82-309HBTF460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,696.16$ 52.08 3,688.00$ 1433 NAC-82-309HBTFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,696.16$ 52.08 3,688.00$ 1434 NAC-82-309VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,102.10$ 52.08 3,403.33$ 1435 NAC-82-309VBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,102.10$ 52.08 3,403.33$ 1436 NAC-82-309VBTF460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 8,273.86$ 52.08 3,964.83$ 1437 NAC-82-309VBTFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 8,273.86$ 52.08 3,964.83$ 1438 NAC-82-348HAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,941.32$ 52.08 2,367.88$ 1439 NAC-82-348HAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,941.32$ 52.08 2,367.88$ 1440 NAC-82-348HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,941.30$ 52.08 2,367.87$ 1441 NAC-82-348HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,941.30$ 52.08 2,367.87$ 1442 NAC-82-348VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,425.92$ 52.08 2,120.90$ 1443 NAC-82-348VAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,425.94$ 52.08 2,120.91$ 1444 NAC-82-348VATFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,457.94$ 52.08 2,615.44$ 1445 NAC-82-348VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,425.94$ 52.08 2,120.91$ 1446 NAC-82-348VBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,425.98$ 52.08 2,120.93$ 1447 NAC-82-348VBTF460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,457.96$ 52.08 2,615.45$ 1448 NAC-82-348VBTFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,457.96$ 52.08 2,615.45$ 1449 NAC-82-349HAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,354.90$ 52.08 2,566.07$ 1450 NAC-82-349HAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,354.88$ 52.08 2,566.06$ 1451 NAC-82-349HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,354.90$ 52.08 2,566.07$ 1452 NAC-82-349HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,354.90$ 52.08 2,566.07$ 1453 NAC-82-356VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,061.96$ 52.08 988.09$ 1454 NAC-82-358VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,883.22$ 52.08 1,860.84$ 1455 NAC-82-368VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,768.76$ 52.08 2,285.19$ 1456 NAC-82-368VATFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,593.64$ 52.08 2,680.47$ 1457 NAC-82-368VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,891.48$ 52.08 2,344.00$ 1458 NAC-82-368VBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,891.48$ 52.08 2,344.00$ 1459 NAC-82-368VBTF460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,593.64$ 52.08 2,680.47$ 1460 NAC-82-368VBTFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,593.64$ 52.08 2,680.47$ 1461 NAC-82-378HAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.28$ 52.08 2,915.11$ 1462 NAC-82-378HAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.28$ 52.08 2,915.11$ 1463 NAC-82-378HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.28$ 52.08 2,915.11$ 1464 NAC-82-378HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.26$ 52.08 2,915.10$ 1465 NAC-82-378VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.34$ 52.08 2,915.14$ 1466 NAC-82-378VAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.34$ 52.08 2,915.14$ 1467 NAC-82-378VATFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,942.72$ 52.08 3,326.95$ 1468 NAC-82-378VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.28$ 52.08 2,915.11$ 1469 NAC-82-378VBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,083.28$ 52.08 2,915.11$ 1470 NAC-82-378VBTF460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,942.44$ 52.08 3,326.82$ 1471 NAC-82-378VBTFF AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,942.44$ 52.08 3,326.82$ 1472 NAC-82-379HAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,938.44$ 52.08 3,324.90$ 1473 NAC-82-379HAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,938.44$ 52.08 3,324.90$ 1474 NAC-82-379HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,938.46$ 52.08 3,324.91$ 1475 NAC-82-379HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,938.46$ 52.08 3,324.91$ 1476 NAC-82-808PGT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,772.80$ 52.08 1,807.93$ 1477 NAC-82-808PGTH AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,734.38$ 52.08 2,268.71$ 1478 NAC-82-823GT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,305.56$ 52.08 2,063.22$ 1479 NAC-82-823GTH AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,390.00$ 52.08 2,582.89$ 1480 NAC-82-1023GT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,493.08$ 52.08 2,153.08$ 1481 NAC-82-1023GTH AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,390.02$ 52.08 2,582.90$ 1482 NAC-82-1033GTH AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,018.80$ 52.08 2,884.21$ 1483 NAC-82-01100 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,755.60$ 52.08 2,758.08$ 1484 NAC-82-1123GTV AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,317.02$ 52.08 2,068.72$ 1485 NAC-82-01125 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,343.98$ 52.08 3,040.04$ 1486 NAC-82-1133GTV AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,937.00$ 52.08 2,845.01$ 1487 NAC-82-01150 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,933.56$ 52.08 3,322.56$ 1488 NAC-82-01200 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,566.04$ 52.08 4,584.05$ 1489 NAC-82-1330GTK AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,179.14$ 52.08 2,481.84$ 1490 NAC-82-1333GTH AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,622.94$ 52.08 2,694.51$ 1491 NAC-82-1633GT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,999.90$ 52.08 3,354.35$ 1492 NAC-82-02100 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,046.54$ 52.08 4,335.10$ 1493 NAC-82-02125 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,985.46$ 52.08 4,785.03$

Page 57 of 65 ends

7.E

Page 137 of 459 ends

1494 NAC-82-2300HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,697.44$ 52.08 6,084.61$ 1495 NAC-82-2300HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,874.70$ 52.08 6,169.56$ 1496 NAC-82-2309HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 11,613.20$ 52.08 5,565.05$ 1497 NAC-82-2309HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 11,976.00$ 52.08 5,738.90$ 1498 NAC-82-2349HAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,769.02$ 52.08 4,681.31$ 1499 NAC-82-2349HAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,155.70$ 52.08 4,866.61$ 1500 NAC-82-2349HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,689.70$ 52.08 4,643.30$ 1501 NAC-82-2349HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,891.28$ 52.08 4,739.90$ 1502 NAC-82-2379HAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,428.54$ 52.08 5,955.76$ 1503 NAC-82-2379HAT208 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,428.54$ 52.08 5,955.76$ 1504 NAC-82-2379HBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 11,327.94$ 52.08 5,428.35$ 1505 NAC-82-2379HBT460 AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 11,554.38$ 52.08 5,536.86$ 1506 NAC-82-4252PAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,334.64$ 52.08 639.56$ 1507 NAC-82-4253PAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,426.48$ 52.08 683.57$ 1508 NAC-82-4254PGT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,509.36$ 52.08 1,202.49$ 1509 NAC-82-4254PGTH AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,939.44$ 52.08 1,408.58$ 1510 NAC-82-4256VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,540.02$ 52.08 737.98$ 1511 NAC-82-4276VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,637.00$ 52.08 784.45$ 1512 NAC-83-0098 NITROGEN ANALYZER NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 895.76$ 52.08 429.25$ 1513 NAC-83-0140 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,800.24$ 52.08 5,175.48$ 1514 NAC-83-0690 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 16,619.46$ 52.08 7,964.05$ 1515 NAC-83-0690M NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 19,170.50$ 52.08 9,186.50$ 1516 NAC-83-1099 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,151.10$ 52.08 1,510.01$ 1517 NAC-83-1100 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,325.18$ 52.08 2,072.63$ 1518 NAC-83-1200 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,177.34$ 52.08 2,001.78$ 1519 NAC-83-1380 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 27,003.36$ 52.08 12,940.01$ 1520 NAC-83-1860 NITORGEN GENERATOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 37,268.42$ 52.08 17,859.03$ 1521 NAC-8090255400 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,168.10$ 52.08 2,955.75$ 1522 NAC-CPX-10 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,781.04$ 52.08 853.47$ 1523 NAC-CPX-10-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,781.04$ 52.08 853.47$ 1524 NAC-CPX-20 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,214.08$ 52.08 1,060.99$ 1525 NAC-CPX-20-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,214.08$ 52.08 1,060.99$ 1526 NAC-CPX-30 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,516.32$ 52.08 1,205.82$ 1527 NAC-CPX-30-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,516.32$ 52.08 1,205.82$ 1528 NAC-CPX-40 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,679.74$ 52.08 1,284.13$ 1529 NAC-CPX-40-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,679.74$ 52.08 1,284.13$ 1530 NAC-CPX-60 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,169.94$ 52.08 1,519.04$ 1531 NAC-CPX-60-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,169.94$ 52.08 1,519.04$ 1532 NAC-CPX-80 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,643.80$ 52.08 1,746.11$ 1533 NAC-CPX-80-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,643.80$ 52.08 1,746.11$ 1534 NAC-CPX-100 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,150.34$ 52.08 1,988.84$ 1535 NAC-CPX-100-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,150.34$ 52.08 1,988.84$ 1536 NAC-CPX-125 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,820.26$ 52.08 2,309.87$ 1537 NAC-CPX-125-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,820.26$ 52.08 2,309.87$ 1538 NAC-CPX-150 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,326.78$ 52.08 2,552.59$ 1539 NAC-CPX-150-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,326.78$ 52.08 2,552.59$ 1540 NAC-CPX-180 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,833.34$ 52.08 2,795.34$ 1541 NAC-CPX-180-230 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,833.34$ 52.08 2,795.34$ 1542 NAC-CPX-225 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,622.56$ 52.08 3,652.73$ 1543 NAC-CPX-270 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 8,439.56$ 52.08 4,044.24$ 1544 NAC-CPX-350 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,073.54$ 52.08 4,827.24$ 1545 NAC-CPX-425 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,890.54$ 52.08 5,218.75$ 1546 NAC-CPX-530 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,524.52$ 52.08 6,001.75$ 1547 NAC-CPX-700 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 16,070.28$ 52.08 7,700.88$ 1548 NAC-CPX-850 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 22,712.40$ 52.08 10,883.78$ 1549 NAC-CPX-1000 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 26,143.80$ 52.08 12,528.11$ 1550 NAC-CPX-1200 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 31,045.74$ 52.08 14,877.12$ 1551 NAC-CPX-1500 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 36,764.70$ 52.08 17,617.64$ 1552 NAC-CPX-1700 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 40,302.32$ 52.08 19,312.87$ 1553 NAC-CPX-2500 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 51,740.20$ 52.08 24,793.90$ 1554 NAC-CPX-3000 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 68,080.08$ 52.08 32,623.97$ 1555 NAC-CPX-HT25 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,859.48$ 52.08 1,370.26$ 1556 NAC-CPX-HT50 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,581.24$ 52.08 2,195.33$ 1557 NAC-CPX-HT75 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 5,964.06$ 52.08 2,857.98$ 1558 NAC-CPX-HT100 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,846.40$ 52.08 3,280.79$ 1559 NAC-CPX-HT125 AIR DRYER NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,728.76$ 52.08 3,703.62$ 1560 NAC-QP-581VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,737.00$ 52.08 3,228.37$ 1561 NAC-QP-583VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 6,787.04$ 52.08 3,252.35$ 1562 NAC-QP-7581VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,312.46$ 52.08 3,504.13$ 1563 NAC-QP-7583VBT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 7,004.04$ 52.08 3,356.34$ 1564 NAC-RCP-908H AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 4,253.18$ 52.08 2,038.12$ 1565 NAC-82-346VAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,359.58$ 50.16 1,176.01$ 1566 NAC-82-346VATBB AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 2,096.29$ 50.16 1,044.79$ 1567 NAC-82-348NVAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,610.80$ 50.16 1,799.62$ 1568 NAC-82-348NVATBB AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 3,602.92$ 50.16 1,795.70$ 1569 NAC-82-4254PAT AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 899.98$ 50.16 448.55$ 1570 NAC-RCP-224VP AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 957.42$ 50.16 477.18$ 1571 NAC-RCP-508H AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 1,739.98$ 50.16 867.21$ 1572 NAC-4152010161 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,412.00$ 50.8 4,630.70$ 1573 NAC-4152010163 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,686.00$ 50.8 5,257.51$ 1574 NAC-4152010165 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 11,372.00$ 50.8 5,595.02$ 1575 NAC-4152010179 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,412.00$ 50.8 4,630.70$ 1576 NAC-4152010181 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,000.00$ 50.8 4,920.00$

Page 58 of 65 ends

7.E

Page 138 of 459 ends

1577 NAC-4152010183 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,628.00$ 50.8 5,228.98$ 1578 NAC-4152010526 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 14,528.00$ 50.8 7,147.78$ 1579 NAC-4152010528 BASE MOUNT SCREW COMP NAPA AIR COMPRESSORS / ATLAS COPCO COMPRESSORS - PALATINE, IL 15,961.22$ 50.8 7,852.92$ 1580 NAC-QP-05501T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,240.28$ 50.8 4,546.22$ 1581 NAC-QP-05501TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 13,218.34$ 50.8 6,503.42$ 1582 NAC-QP-05503T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 9,240.22$ 50.8 4,546.19$ 1583 NAC-QP-05503TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,771.34$ 50.8 6,283.50$ 1584 NAC-QP-07501T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 11,095.04$ 50.8 5,458.76$ 1585 NAC-QP-07501TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 15,073.10$ 50.8 7,415.97$ 1586 NAC-QP-07503T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 10,971.10$ 50.8 5,397.78$ 1587 NAC-QP-07503TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 14,031.56$ 50.8 6,903.53$ 1588 NAC-QP-10253T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,563.70$ 50.8 6,181.34$ 1589 NAC-QP-10253TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 17,523.70$ 50.8 8,621.66$ 1590 NAC-QP-10503T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 12,563.70$ 50.8 6,181.34$ 1591 NAC-QP-10503TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 17,523.74$ 50.8 8,621.68$ 1592 NAC-QP-15253T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 13,990.44$ 50.8 6,883.30$ 1593 NAC-QP-15253TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 18,942.10$ 50.8 9,319.51$ 1594 NAC-QP-15503T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 13,990.44$ 50.8 6,883.30$ 1595 NAC-QP-15503TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 19,599.98$ 50.8 9,643.19$ 1596 NAC-QP-20253B SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 23,771.92$ 50.8 11,695.78$ 1597 NAC-QP-20253T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 26,220.50$ 50.8 12,900.49$ 1598 NAC-QP-20253TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 31,769.60$ 50.8 15,630.64$ 1599 NAC-QP-25253B SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 25,264.58$ 50.8 12,430.17$ 1600 NAC-QP-25253T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 28,036.58$ 50.8 13,794.00$ 1601 NAC-QP-25253TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 33,212.68$ 50.8 16,340.64$ 1602 NAC-QP-30253B SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 27,990.36$ 50.8 13,771.26$ 1603 NAC-QP-30253T SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 30,218.22$ 50.8 14,867.36$ 1604 NAC-QP-30253TD SCREW COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 35,394.34$ 50.8 17,414.02$ 1605 NAC-QRS-20-HPBM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 27,160.16$ 50.8 13,362.80$ 1606 NAC-QRS-20-HPDBM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 32,898.12$ 50.8 16,185.88$ 1607 NAC-QRS-20-HPDTM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 35,920.44$ 50.8 17,672.86$ 1608 NAC-QRS-20-HPTM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 30,300.28$ 50.8 14,907.74$ 1609 NAC-QRS-25-HPBM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 28,245.34$ 50.8 13,896.71$ 1610 NAC-QRS-25-HPDBM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 34,089.52$ 50.8 16,772.04$ 1611 NAC-QRS-25-HPDTM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 37,220.06$ 50.8 18,312.27$ 1612 NAC-QRS-25-HPTM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 31,375.92$ 50.8 15,436.95$ 1613 NAC-QRS-30-HPBM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 31,345.88$ 50.8 15,422.17$ 1614 NAC-QRS-30-HPDBM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 36,462.92$ 50.8 17,939.76$ 1615 NAC-QRS-30-HPDTM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 39,603.06$ 50.8 19,484.71$ 1616 NAC-QRS-30-HPTM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 33,867.08$ 50.8 16,662.60$ 1617 NAC-QRSM-20-125TM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 17,542.02$ 50.8 8,630.67$ 1618 NAC-QRSM-20-150TM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 17,542.02$ 50.8 8,630.67$ 1619 NAC-QRSM-20D-125TM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 23,136.06$ 50.8 11,382.94$ 1620 NAC-QRSM-20D-150TM AIR COMPRESSOR NAPA AIR COMPR / ATLAS COPCO COMPRESSORS - PALATINE, IL 23,136.06$ 50.8 11,382.94$ 1621 ROB-5280 HD DPF CLEANER ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 46,399.84$ 51.87 22,332.24$ 1622 ROB-5281 OTC DPF TPU OVEN ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 26,004.46$ 51.87 12,515.95$ 1623 ROB-5286 PORTABLE DPF CLEANER ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 27,551.34$ 51.87 13,260.46$ 1624 ROB-17580 A/C FLUSHING SYSTEM ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 5,916.66$ 51.87 2,847.69$ 1625 ROB-17800C AC MACINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 14,171.20$ 51.87 6,820.60$ 1626 ROB-34288 RRR R134A UNIT ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 6,762.18$ 51.87 3,254.64$ 1627 ROB-34288NI AC MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 8,388.10$ 51.87 4,037.19$ 1628 ROB-34788-H ROBINAIR RRR HYBRID ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 8,221.96$ 51.87 3,957.23$ 1629 ROB-34788NI AIR CONDITIONING CART ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 9,091.32$ 51.87 4,375.65$ 1630 ROB-34788NI-H AIR CONDITIONING CART ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 9,239.16$ 51.87 4,446.81$ 1631 ROB-34888HD AC MACINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 13,155.62$ 51.87 6,331.80$ 1632 ROB-34988 RRR MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 9,661.16$ 51.87 4,649.92$ 1633 ROB-34988NI A/C RECHARGE MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 10,695.68$ 51.87 5,147.83$ 1634 ROB-34998 R134A MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 11,458.00$ 51.87 5,514.74$ 1635 ROB-75700 COOLANT EXCHANGER ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 4,939.94$ 51.87 2,377.59$ 1636 ROB-92500 TRANS FLUID MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 10,318.80$ 51.87 4,966.44$ 1637 ROB-92500-NP TRANS EX ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 11,101.34$ 51.87 5,343.07$ 1638 ROB-AC1234-4 AC RECOVERY MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 12,655.84$ 51.87 6,091.26$ 1639 ROB-AC1234-6 1234YF AC RRR ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 13,641.32$ 51.87 6,565.57$ 1640 ROB-AC1234-9 R1234YF MACHINE ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 13,950.00$ 51.87 6,714.14$ 1641 ROB-REBATE200 REBATE S54700-S54701 ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 200.00$ 51.87 96.26$ 1642 ROB-REBATE300 REBATE S54710-S54711 ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 300.00$ 51.87 144.39$ 1643 ROB-REBATE400 REBATE S77700-S77701 ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 400.00$ 51.87 192.52$ 1644 ROB-REBATE500 REBATE S77310-S77311 ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 500.00$ 51.87 240.65$ 1645 ROB-S777CART SMOG CALIFORNIA ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 1,898.00$ 51.87 913.51$ 1646 ROB-S54601 OBDATA WORKSTATION ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 13,498.00$ 51.87 6,496.59$ 1647 ROB-S54700 WIRED DAD TOOL KIT ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 2,298.00$ 51.87 1,106.03$ 1648 ROB-S54701 WIRELESS DAD TOOL KIT ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 2,678.00$ 51.87 1,288.92$ 1649 ROB-S54710 BENCHTOP OIS WIRED ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 6,398.00$ 51.87 3,079.36$ 1650 ROB-S54711 BENCHTOP OIS WIRELESS ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 6,898.00$ 51.87 3,320.01$ 1651 ROB-S77700 WIRED DAD TOOL KIT ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 8,298.00$ 51.87 3,993.83$ 1652 ROB-S77701 WIRED DAD TOOL KIT ROBINAIRE / BOSCH AUTO SERVICE SOLUTIONS (FORM SPX) 8,698.00$ 51.87 4,186.35$ 1653 RTY-AR14N100YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 38,535.32$ 52.87 18,161.70$ 1654 RTY-AR14N100YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 38,535.32$ 52.87 18,161.70$ 1655 RTY-AR14N101YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 38,535.32$ 52.87 18,161.70$ 1656 RTY-AR14N101YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 38,535.32$ 52.87 18,161.70$ 1657 RTY-AR14N102YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,263.24$ 52.87 18,504.77$ 1658 RTY-AR14N102YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,263.24$ 52.87 18,504.77$ 1659 RTY-AR18N010BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 43,642.44$ 52.87 20,568.68$

Page 59 of 65 ends

7.E

Page 139 of 459 ends

1660 RTY-AR18N010RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 43,642.44$ 52.87 20,568.68$ 1661 RTY-AR18N011BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 46,909.40$ 52.87 22,108.40$ 1662 RTY-AR18N011RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 46,909.40$ 52.87 22,108.40$ 1663 RTY-ARO14N100YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,727.56$ 52.87 18,723.60$ 1664 RTY-ARO14N100YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,727.56$ 52.87 18,723.60$ 1665 RTY-ARO14N101YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 42,965.58$ 52.87 20,249.68$ 1666 RTY-ARO14N101YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 42,965.58$ 52.87 20,249.68$ 1667 RTY-ARO14N102YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 43,718.24$ 52.87 20,604.41$ 1668 RTY-ARO14N102YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 43,718.24$ 52.87 20,604.41$ 1669 RTY-MCH413U1A00 ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 66,704.60$ 52.87 31,437.88$ 1670 RTY-MCH418U101RD ROTARY LIFT-72000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 95,497.88$ 52.87 45,008.15$ 1671 RTY-MCHF214U1A00 MOBILE COLUMNS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 42,026.34$ 52.87 19,807.01$ 1672 RTY-MCHF219U100 18K/COLUMN REM/CONTRL ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 56,336.06$ 52.87 26,551.19$ 1673 RTY-MCHF414U1A00 MOBILE COLUMNS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 81,577.58$ 52.87 38,447.51$ 1674 RTY-MCHF419U100 18K/COLUMN REM/CONTRL ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 110,282.24$ 52.87 51,976.02$ 1675 RTY-MCHF614U1A00 MOBILE COLUMNS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 122,366.38$ 52.87 57,671.27$ 1676 RTY-MCHF619U100 18K/COLUMN REM/CONTRL ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 165,421.96$ 52.87 77,963.37$ 1677 RTY-MCHM214 MOBILE COLUMN LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 45,578.00$ 52.87 21,480.91$ 1678 RTY-MCHM219 MOBILE COLUMN LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 60,878.00$ 52.87 28,691.80$ 1679 RTY-MCHM414 MOBILE COLUMN LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 88,778.00$ 52.87 41,841.07$ 1680 RTY-MCHM419 MOBILE COLUMN LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 119,378.00$ 52.87 56,262.85$ 1681 RTY-MCHM614 MOBILE COLUMN LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 134,358.00$ 52.87 63,322.93$ 1682 RTY-MCHM619 MOBILE COLUMN LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 179,058.00$ 52.87 84,390.04$ 1683 RTY-MCHW218U100 2 COLUMN MOBILE LIFTS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 49,474.16$ 52.87 23,317.17$ 1684 RTY-MCHW418U100 ROTARY LIFT-72000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 98,992.62$ 52.87 46,655.22$ 1685 RTY-MCHW618U100 6 COLUMN MOBILE LIFTS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 148,422.08$ 52.87 69,951.33$ 1686 RTY-RLP77N0000BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 20,883.88$ 52.87 9,842.57$ 1687 RTY-RLP77N0000WG ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 20,883.88$ 52.87 9,842.57$ 1688 RTY-SL210N10T0RD 10K INGROUND LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 19,550.40$ 52.87 9,214.10$ 1689 RTY-SL210N1000RD 10K INGROUND LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 19,550.40$ 52.87 9,214.10$ 1690 RTY-SL212N1110BL 12K INGROUND LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 25,268.48$ 52.87 11,909.03$ 1691 RTY-SM14N100YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,612.26$ 52.87 5,472.86$ 1692 RTY-SM14N100YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,612.26$ 52.87 5,472.86$ 1693 RTY-SM14N101YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,612.26$ 52.87 5,472.86$ 1694 RTY-SM14N101YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,612.26$ 52.87 5,472.86$ 1695 RTY-SM14N102YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,360.76$ 52.87 5,825.63$ 1696 RTY-SM14N102YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,360.72$ 52.87 5,825.61$ 1697 RTY-SM18N000BL ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 19,171.78$ 52.87 9,035.66$ 1698 RTY-SM18N000RD ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 19,171.78$ 52.87 9,035.66$ 1699 RTY-SM18N001BL ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 21,005.16$ 52.87 9,899.73$ 1700 RTY-SM18N001RD ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 21,005.16$ 52.87 9,899.73$ 1701 RTY-SM30N010BL ROTARY LIFT-30000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,800.28$ 52.87 16,872.67$ 1702 RTY-SM30N010RD ROTARY LIFT-30000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,800.28$ 52.87 16,872.67$ 1703 RTY-SM30N011BL ROTARY LIFT-30000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,059.02$ 52.87 18,408.52$ 1704 RTY-SM30N011RD ROTARY LIFT-30000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,059.02$ 52.87 18,408.52$ 1705 RTY-SM30N012BL ROTARY LIFT-30000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 42,313.58$ 52.87 19,942.39$ 1706 RTY-SM30N012RD ROTARY LIFT-30000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 42,313.58$ 52.87 19,942.39$ 1707 RTY-SMO14N100YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,963.92$ 52.87 6,581.20$ 1708 RTY-SMO14N100YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,963.92$ 52.87 6,581.20$ 1709 RTY-SMO14N101YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,102.54$ 52.87 7,117.83$ 1710 RTY-SMO14N101YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,102.54$ 52.87 7,117.83$ 1711 RTY-SMO14N102YBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,873.10$ 52.87 7,480.99$ 1712 RTY-SMO14N102YRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,873.10$ 52.87 7,480.99$ 1713 RTY-SPO10N5T0BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,909.82$ 52.87 4,670.50$ 1714 RTY-SPO10N5T0RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,909.82$ 52.87 4,670.50$ 1715 RTY-SPO10N5T5BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,276.52$ 52.87 4,843.32$ 1716 RTY-SPO10N5T5RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,276.52$ 52.87 4,843.32$ 1717 RTY-SPO10N5T6BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,623.90$ 52.87 5,007.04$ 1718 RTY-SPO10N5T6RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,623.90$ 52.87 5,007.04$ 1719 RTY-SPO10N5T7BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,063.60$ 52.87 5,214.27$ 1720 RTY-SPO10N5T7RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,063.60$ 52.87 5,214.27$ 1721 RTY-SPO10N5T9BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,092.74$ 52.87 6,170.61$ 1722 RTY-SPO10N5T9RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,092.74$ 52.87 6,170.61$ 1723 RTY-SPO10N8T0BL 2 POST TRIO ARM LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,712.86$ 52.87 5,048.97$ 1724 RTY-SPO10N8T0RD 2 POST TRIO ARM LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,712.86$ 52.87 5,048.97$ 1725 RTY-SPO10N700BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,478.40$ 52.87 4,467.17$ 1726 RTY-SPO10N700RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,478.38$ 52.87 4,467.16$ 1727 RTY-SPO10N705BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,873.96$ 52.87 4,653.60$ 1728 RTY-SPO10N705RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,873.96$ 52.87 4,653.60$ 1729 RTY-SPO10N706BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,250.32$ 52.87 4,830.98$ 1730 RTY-SPO10N706RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,250.32$ 52.87 4,830.98$ 1731 RTY-SPO10N707BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,724.52$ 52.87 5,054.47$ 1732 RTY-SPO10N707RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,724.52$ 52.87 5,054.47$ 1733 RTY-SPO10N709BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,672.92$ 52.87 5,501.45$ 1734 RTY-SPO10N709RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,672.92$ 52.87 5,501.45$ 1735 RTY-SPO10U5G5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,322.94$ 52.87 6,279.10$ 1736 RTY-SPO10U5G5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,322.94$ 52.87 6,279.10$ 1737 RTY-SPO10U5G6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,035.60$ 52.87 6,614.98$ 1738 RTY-SPO10U5G6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,035.60$ 52.87 6,614.98$ 1739 RTY-SPO10U5G7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,475.34$ 52.87 6,822.23$ 1740 RTY-SPO10U5G7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,475.34$ 52.87 6,822.23$ 1741 RTY-SPO10U5T5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,322.94$ 52.87 6,279.10$ 1742 RTY-SPO10U5T5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,322.94$ 52.87 6,279.10$

Page 60 of 65 ends

7.E

Page 140 of 459 ends

1743 RTY-SPO10U5T6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,035.60$ 52.87 6,614.98$ 1744 RTY-SPO10U5T6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,035.60$ 52.87 6,614.98$ 1745 RTY-SPO10U5T7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,475.34$ 52.87 6,822.23$ 1746 RTY-SPO10U5T7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,475.34$ 52.87 6,822.23$ 1747 RTY-SPO10U8T5BL 2 POST SHOCKWAVE TRIO ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,402.74$ 52.87 6,788.01$ 1748 RTY-SPO10U8T5RD 2 POST SHOCKWAVE TRIO ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,402.74$ 52.87 6,788.01$ 1749 RTY-SPO10U705BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,160.28$ 52.87 6,202.44$ 1750 RTY-SPO10U705RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,160.28$ 52.87 6,202.44$ 1751 RTY-SPO10U706BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,932.22$ 52.87 6,566.26$ 1752 RTY-SPO10U706RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,932.22$ 52.87 6,566.26$ 1753 RTY-SPO10U707BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,407.76$ 52.87 6,790.38$ 1754 RTY-SPO10U707RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,407.76$ 52.87 6,790.38$ 1755 RTY-SPO12N7T5BK 12K TWO POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,829.86$ 52.87 6,989.31$ 1756 RTY-SPO12N7T5BL ROTARY LIFT-12000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,836.54$ 52.87 6,992.46$ 1757 RTY-SPO12N7T5RD ROTARY LIFT-12000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,836.54$ 52.87 6,992.46$ 1758 RTY-SPO12N7T6BL ROTARY LIFT-12000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,059.20$ 52.87 7,568.70$ 1759 RTY-SPO12N7T6RD ROTARY LIFT-12000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,059.20$ 52.87 7,568.70$ 1760 RTY-SPO12N7T7BL ROTARY LIFT-12000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,503.06$ 52.87 7,777.89$ 1761 RTY-SPO12N7T7RD ROTARY LIFT-12000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,503.06$ 52.87 7,777.89$ 1762 RTY-SPO12N7TLBL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,551.92$ 52.87 7,329.62$ 1763 RTY-SPO12N7TLRD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,551.92$ 52.87 7,329.62$ 1764 RTY-SPO15LC310BL ROTARY LIFT-15000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 25,922.16$ 52.87 12,217.11$ 1765 RTY-SPO15LC310RD ROTARY LIFT-15000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 25,922.16$ 52.87 12,217.11$ 1766 RTY-SPO15N310BL ROTARY LIFT-15000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 25,922.16$ 52.87 12,217.11$ 1767 RTY-SPO15N310RD ROTARY LIFT-15000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 25,922.16$ 52.87 12,217.11$ 1768 RTY-SPO16N0A0BL 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 30,825.38$ 52.87 14,528.00$ 1769 RTY-SPO16N0A0RD 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 30,825.38$ 52.87 14,528.00$ 1770 RTY-SPO16N0T0BL 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 30,825.38$ 52.87 14,528.00$ 1771 RTY-SPO16N0T0RD 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 30,825.38$ 52.87 14,528.00$ 1772 RTY-SPO16U0A0BL 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,594.16$ 52.87 16,775.53$ 1773 RTY-SPO16U0A0RD 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,594.16$ 52.87 16,775.53$ 1774 RTY-SPO18LC310BL ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,159.30$ 52.87 16,570.58$ 1775 RTY-SPO18LC310RD ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,159.30$ 52.87 16,570.58$ 1776 RTY-SPO18N310BK 18K TWO POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 34,658.30$ 52.87 16,334.46$ 1777 RTY-SPO18N310BL ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,159.30$ 52.87 16,570.58$ 1778 RTY-SPO18N310RD ROTARY LIFT-18000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 35,159.30$ 52.87 16,570.58$ 1779 RTY-SPO20N0T0BL 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 41,811.02$ 52.87 19,705.53$ 1780 RTY-SPO20N0T0RD 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 41,811.02$ 52.87 19,705.53$ 1781 RTY-SPO20U0T0BL 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 45,918.00$ 52.87 21,641.15$ 1782 RTY-SPO20U0T0RD 2 POST LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 45,918.00$ 52.87 21,641.15$ 1783 RTY-SPOA7N6X0BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,180.36$ 52.87 6,683.20$ 1784 RTY-SPOA7N6X0RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,180.36$ 52.87 6,683.20$ 1785 RTY-SPOA7N6X5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,574.60$ 52.87 6,869.01$ 1786 RTY-SPOA7N6X5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,574.60$ 52.87 6,869.01$ 1787 RTY-SPOA7N6X6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,950.92$ 52.87 7,046.37$ 1788 RTY-SPOA7N6X6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,950.92$ 52.87 7,046.37$ 1789 RTY-SPOA7N6X7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,426.46$ 52.87 7,270.49$ 1790 RTY-SPOA7N6X7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,426.46$ 52.87 7,270.49$ 1791 RTY-SPOA7U6X5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 17,411.46$ 52.87 8,206.02$ 1792 RTY-SPOA7U6X5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 17,411.46$ 52.87 8,206.02$ 1793 RTY-SPOA7U6X6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 18,182.06$ 52.87 8,569.20$ 1794 RTY-SPOA7U6X6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 18,182.06$ 52.87 8,569.20$ 1795 RTY-SPOA7U6X7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 18,657.62$ 52.87 8,793.34$ 1796 RTY-SPOA7U6X7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 18,657.62$ 52.87 8,793.34$ 1797 RTY-SPOA7U7N5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,038.36$ 52.87 6,616.28$ 1798 RTY-SPOA7U7N5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,038.36$ 52.87 6,616.28$ 1799 RTY-SPOA10N5G0BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1800 RTY-SPOA10N5G0RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1801 RTY-SPOA10N5G5BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.28$ 52.87 5,847.08$ 1802 RTY-SPOA10N5G5RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.28$ 52.87 5,847.08$ 1803 RTY-SPOA10N5G6BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1804 RTY-SPOA10N5G6RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1805 RTY-SPOA10N5G7BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1806 RTY-SPOA10N5G7RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1807 RTY-SPOA10N5T0BL ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1808 RTY-SPOA10N5T0RD ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,406.26$ 52.87 5,847.07$ 1809 RTY-SPOA10N8G0BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,492.94$ 52.87 4,945.32$ 1810 RTY-SPOA10N8G0RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,492.94$ 52.87 4,945.32$ 1811 RTY-SPOA10N8G5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,895.44$ 52.87 5,135.02$ 1812 RTY-SPOA10N8G5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,895.44$ 52.87 5,135.02$ 1813 RTY-SPOA10N8G6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,275.88$ 52.87 5,314.32$ 1814 RTY-SPOA10N8G6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,275.88$ 52.87 5,314.32$ 1815 RTY-SPOA10N8G7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,758.36$ 52.87 5,541.72$ 1816 RTY-SPOA10N8G7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,758.36$ 52.87 5,541.72$ 1817 RTY-SPOA10N8T0BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,492.94$ 52.87 4,945.32$ 1818 RTY-SPOA10N8T0RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,492.94$ 52.87 4,945.32$ 1819 RTY-SPOA10N8T5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,895.44$ 52.87 5,135.02$ 1820 RTY-SPOA10N8T5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,895.44$ 52.87 5,135.02$ 1821 RTY-SPOA10N8T6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,275.88$ 52.87 5,314.32$ 1822 RTY-SPOA10N8T6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,275.88$ 52.87 5,314.32$ 1823 RTY-SPOA10N8T7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,758.36$ 52.87 5,541.72$ 1824 RTY-SPOA10N8T7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,758.36$ 52.87 5,541.72$ 1825 RTY-SPOA10N700BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,478.40$ 52.87 4,467.17$

Page 61 of 65 ends

7.E

Page 141 of 459 ends

1826 RTY-SPOA10N700RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,478.40$ 52.87 4,467.17$ 1827 RTY-SPOA10N705BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,873.96$ 52.87 4,653.60$ 1828 RTY-SPOA10N705RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,873.96$ 52.87 4,653.60$ 1829 RTY-SPOA10N706BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,248.94$ 52.87 4,830.33$ 1830 RTY-SPOA10N706RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,248.94$ 52.87 4,830.33$ 1831 RTY-SPOA10N707BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,724.52$ 52.87 5,054.47$ 1832 RTY-SPOA10N707RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,724.52$ 52.87 5,054.47$ 1833 RTY-SPOA10N800BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,492.94$ 52.87 4,945.32$ 1834 RTY-SPOA10N800RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,492.94$ 52.87 4,945.32$ 1835 RTY-SPOA10N805BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,895.44$ 52.87 5,135.02$ 1836 RTY-SPOA10N805RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 10,895.44$ 52.87 5,135.02$ 1837 RTY-SPOA10N806BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,275.88$ 52.87 5,314.32$ 1838 RTY-SPOA10N806RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,275.88$ 52.87 5,314.32$ 1839 RTY-SPOA10N807BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,758.36$ 52.87 5,541.72$ 1840 RTY-SPOA10N807RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,758.36$ 52.87 5,541.72$ 1841 RTY-SPOA10U5G5BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,486.98$ 52.87 6,356.41$ 1842 RTY-SPOA10U5G5RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,486.98$ 52.87 6,356.41$ 1843 RTY-SPOA10U5G6BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,246.54$ 52.87 6,714.39$ 1844 RTY-SPOA10U5G6RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,246.54$ 52.87 6,714.39$ 1845 RTY-SPOA10U5G7BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,715.20$ 52.87 6,935.27$ 1846 RTY-SPOA10U5G7RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,715.20$ 52.87 6,935.27$ 1847 RTY-SPOA10U5T5BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,486.98$ 52.87 6,356.41$ 1848 RTY-SPOA10U5T5RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,486.98$ 52.87 6,356.41$ 1849 RTY-SPOA10U5T6BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,246.54$ 52.87 6,714.39$ 1850 RTY-SPOA10U5T6RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,246.54$ 52.87 6,714.39$ 1851 RTY-SPOA10U5T7BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,715.20$ 52.87 6,935.27$ 1852 RTY-SPOA10U5T7RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,715.20$ 52.87 6,935.27$ 1853 RTY-SPOA10U8G5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,363.70$ 52.87 6,769.61$ 1854 RTY-SPOA10U8G5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,363.70$ 52.87 6,769.61$ 1855 RTY-SPOA10U8G6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,145.26$ 52.87 7,137.96$ 1856 RTY-SPOA10U8G6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,145.26$ 52.87 7,137.96$ 1857 RTY-SPOA10U8G7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,627.72$ 52.87 7,365.34$ 1858 RTY-SPOA10U8G7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,627.72$ 52.87 7,365.34$ 1859 RTY-SPOA10U8T5BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,363.70$ 52.87 6,769.61$ 1860 RTY-SPOA10U8T5RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,363.70$ 52.87 6,769.61$ 1861 RTY-SPOA10U8T6BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,145.26$ 52.87 7,137.96$ 1862 RTY-SPOA10U8T6RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,145.26$ 52.87 7,137.96$ 1863 RTY-SPOA10U8T7BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,627.66$ 52.87 7,365.32$ 1864 RTY-SPOA10U8T7RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,627.66$ 52.87 7,365.32$ 1865 RTY-SPOA10U705BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,160.28$ 52.87 6,202.44$ 1866 RTY-SPOA10U705RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,160.28$ 52.87 6,202.44$ 1867 RTY-SPOA10U706BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,932.20$ 52.87 6,566.25$ 1868 RTY-SPOA10U706RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 13,932.20$ 52.87 6,566.25$ 1869 RTY-SPOA10U707BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,407.76$ 52.87 6,790.38$ 1870 RTY-SPOA10U707RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,407.76$ 52.87 6,790.38$ 1871 RTY-SPOA10U805BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,363.70$ 52.87 6,769.61$ 1872 RTY-SPOA10U805RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,363.70$ 52.87 6,769.61$ 1873 RTY-SPOA10U806BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,145.26$ 52.87 7,137.96$ 1874 RTY-SPOA10U806RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,145.26$ 52.87 7,137.96$ 1875 RTY-SPOA10U807BL ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,627.72$ 52.87 7,365.34$ 1876 RTY-SPOA10U807RD ROTARY/LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,627.72$ 52.87 7,365.34$ 1877 RTY-TLO7N560BL ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,946.80$ 52.87 7,044.43$ 1878 RTY-TLO7N560RD ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,946.80$ 52.87 7,044.43$ 1879 RTY-TLO7N565BL ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,131.48$ 52.87 7,131.47$ 1880 RTY-TLO7N565RD ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,131.48$ 52.87 7,131.47$ 1881 RTY-TLO7N566BL ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,513.32$ 52.87 7,311.43$ 1882 RTY-TLO7N566RD ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,513.32$ 52.87 7,311.43$ 1883 RTY-TLO7N567BL ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,237.02$ 52.87 7,652.51$ 1884 RTY-TLO7N567RD ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,237.02$ 52.87 7,652.51$ 1885 RTY-TLO7N569BL ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 17,218.50$ 52.87 8,115.08$ 1886 RTY-TLO7N569RD ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 17,218.50$ 52.87 8,115.08$ 1887 RTY-VLXS7000BL ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 5,569.00$ 52.87 2,624.67$ 1888 RTY-VLXS7000RD ROTARY LIFT-7000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 5,569.00$ 52.87 2,624.67$ 1889 RTY-VLXS10000BL ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 8,317.72$ 52.87 3,920.14$ 1890 RTY-VLXS10000RD ROTARY LIFT-10000 LBS ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 8,317.72$ 52.87 3,920.14$ 1891 RTY-X14N0010BL SCISSOR LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 39,958.00$ 52.87 18,832.21$ 1892 RTY-XA14N0110BL ALIGNMENT LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 56,346.04$ 52.87 26,555.89$ 1893 RTY-XA14N0110RD ALIGNMENT LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 56,346.04$ 52.87 26,555.89$ 1894 RTY-Y12N1000BL ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 32,212.14$ 52.87 15,181.58$ 1895 RTY-Y12N1000RD ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 32,212.14$ 52.87 15,181.58$ 1896 RTY-Y12N1010BL ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 32,212.14$ 52.87 15,181.58$ 1897 RTY-Y12N1010RD ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 32,212.14$ 52.87 15,181.58$ 1898 RTY-YA12N1100BL ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 57,664.30$ 52.87 27,177.18$ 1899 RTY-YA12N1100RD ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 57,664.30$ 52.87 27,177.18$ 1900 RTY-YA12N1110BL ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 48,471.26$ 52.87 22,844.50$ 1901 RTY-YA12N1110RD ROTARY LIFT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 48,471.26$ 52.87 22,844.50$ 1902 RTY-RWA3000HP TIRE ALIGNMENT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 46,925.22$ 51.19 22,904.20$ 1903 RTY-RWA6080WS TIRE ALIGNMENT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 20,312.46$ 51.19 9,914.51$ 1904 RTY-RWA7080WS TIRE ALIGNMENT ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 30,747.56$ 51.19 15,007.88$ 1905 RTY-RWA8060TWS 6 CCD HD ALIGNER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 58,876.92$ 51.19 28,737.82$ 1906 RTY-RWATD3000HPR WHEEL ALIGNER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 47,738.00$ 51.19 23,300.92$ 1907 RTY-RWB222H WHEEL BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 3,645.64$ 51.19 1,779.44$ 1908 RTY-RWB240RTLDB BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,498.00$ 51.19 7,564.57$

Page 62 of 65 ends

7.E

Page 142 of 459 ends

1909 RTY-RWB280PRTLC 2D HD BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 18,836.52$ 51.19 9,194.11$ 1910 RTY-RWB280PRTLCB BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 19,018.00$ 51.19 9,282.69$ 1911 RTY-RWB338FMD WHEEL BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 4,967.38$ 51.19 2,424.58$ 1912 RTY-RWB338FMDB BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 4,998.00$ 51.19 2,439.52$ 1913 RTY-RWB348DB BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 8,898.00$ 51.19 4,343.11$ 1914 RTY-RWB355S WHEEL BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 11,128.92$ 51.19 5,432.03$ 1915 RTY-RWB355SB BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,098.00$ 51.19 5,905.03$ 1916 RTY-RWB3803DTEC WHEEL BALANCER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 20,961.40$ 51.19 10,231.26$ 1917 RTY-RWC01N SPEED CHANGER HD ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 36,152.28$ 51.19 17,645.93$ 1918 RTY-RWC11EI LEVERLESS HD CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 23,491.32$ 51.19 11,466.11$ 1919 RTY-RWC11EISB CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 24,598.00$ 51.19 12,006.28$ 1920 RTY-RWC26HW MOBILE HD CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 19,894.76$ 51.19 9,710.63$ 1921 RTY-RWC26HWSB CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 20,398.00$ 51.19 9,956.26$ 1922 RTY-RWC247D TIRE CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 17,258.00$ 51.19 8,423.63$ 1923 RTY-RWC247DCLIB CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 17,798.00$ 51.19 8,687.20$ 1924 RTY-RWC645D26IH CHANGER W/HELPER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 16,125.76$ 51.19 7,870.98$ 1925 RTY-RWC24022I TIRE CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 6,563.82$ 51.19 3,203.80$ 1926 RTY-RWC24626I TIRE CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 9,229.76$ 51.19 4,505.05$ 1927 RTY-RWC24626IP TIRE CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,058.00$ 51.19 5,885.51$ 1928 RTY-RWC24626IRP TIRE CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 12,538.00$ 51.19 6,119.80$ 1929 RTY-RWC24626RAP CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 14,398.00$ 51.19 7,027.66$ 1930 RTY-RWC64526IH CHANGER W/HELPER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 15,183.86$ 51.19 7,411.24$ 1931 RTY-RWC115030I TIRE CHANGER ROTARY LIFTS / ROTARY LIFT - CHICAGO, IL 24,506.10$ 51.19 11,961.43$ 1932 SOR-1002 BATTERY MAINT CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 76.48$ 58.33 31.87$ 1933 SOR-2001 JUMP STARTER CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 2,185.60$ 58.33 910.74$ 1934 SOR-3001 JUMP STARTER/CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 3,189.08$ 58.33 1,328.89$ 1935 SOR-4001 12/24 WHEELED UNIT SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,926.86$ 58.33 802.92$ 1936 SOR-4506 6/2AMP6/12VBATCHRG SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 98.16$ 58.33 40.90$ 1937 SOR-4506C 6/2AMP 6/12V BATCH RG SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 95.66$ 58.33 39.86$ 1938 SOR-4512 12/6/2AMP12VBATCHRG SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 130.56$ 58.33 54.40$ 1939 SOR-4512C 12/6/2AP 12V BATCH RG SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 138.90$ 58.33 57.88$ 1940 SOR-4520 20/10/2AMP12VBATCHRG SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 164.46$ 58.33 68.53$ 1941 SOR-4520C 20/10/2A 12V BATCH RG SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 174.78$ 58.33 72.83$ 1942 SOR-4735 WHEEL BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 485.92$ 58.33 202.48$ 1943 SOR-4745 BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 707.92$ 58.33 294.99$ 1944 SOR-CS1100 ROCK&ROLL JMPSTART SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 121.84$ 58.33 50.77$ 1945 SOR-ES400 JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 272.26$ 58.33 113.45$ 1946 SOR-ES580 JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 364.42$ 58.33 151.85$ 1947 SOR-ES1224 BOOS/PAC SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,573.16$ 58.33 655.54$ 1948 SOR-ES2500 BOOSTER PAC SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 346.52$ 58.33 144.39$ 1949 SOR-ES2500C BOOSTER PAC SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 310.96$ 58.33 129.58$ 1950 SOR-ES5000 BOOS/PAC SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 448.86$ 58.33 187.04$ 1951 SOR-ES5000C BOOS/PAC SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 366.16$ 58.33 152.58$ 1952 SOR-ES6000 3000PEAKAMP JMP/START SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 806.56$ 58.33 336.09$ 1953 SOR-ESA214 CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 42.00$ 58.33 17.50$ 1954 SOR-ESA218 CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 47.78$ 58.33 19.91$ 1955 SOR-FMB1224 FIXED MT JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 5,958.50$ 58.33 2,482.91$ 1956 SOR-HT1224 JUMPSTARTER/CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 4,217.76$ 58.33 1,757.54$ 1957 SOR-HT1224AGM HD CHARGER/STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 5,290.64$ 58.33 2,204.61$ 1958 SOR-JNC12/24 JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,463.78$ 58.33 609.96$ 1959 SOR-JNC300XL 12 VOLT JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 217.90$ 58.33 90.80$ 1960 SOR-JNC300XLC 12 VOLT JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 218.96$ 58.33 91.24$ 1961 SOR-JNC660 12 VOLT JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 520.66$ 58.33 216.96$ 1962 SOR-JNC660C 12 VOLT JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 458.16$ 58.33 190.92$ 1963 SOR-JNC770R 12V JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 603.20$ 58.33 251.35$ 1964 SOR-JNC950 JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,057.26$ 58.33 440.56$ 1965 SOR-JNC4000 12 VOLT JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 376.78$ 58.33 157.00$ 1966 SOR-JNC8550 JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 731.80$ 58.33 304.94$ 1967 SOR-JNC8800 JUMP STARTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 921.44$ 58.33 383.96$ 1968 SOR-JNCAIR PEAK AMPS AIR DEL/SYS SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 768.70$ 58.33 320.32$ 1969 SOR-PI1500X 150W PWR INVERTER USB SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 72.04$ 58.33 30.02$ 1970 SOR-PI5000X 500W POWER INVERTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 169.68$ 58.33 70.71$ 1971 SOR-PI10000X 1000W POWER INVERTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 356.30$ 58.33 148.47$ 1972 SOR-PI15000X 1500W POWER INVERTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 629.04$ 58.33 262.12$ 1973 SOR-PI20000X 2000W POWER INVERTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 689.62$ 58.33 287.36$ 1974 SOR-PI30000X 3000W POWER INVERTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,379.34$ 58.33 574.77$ 1975 SOR-PL2140 6/12V 4A BAT/MAINTNR SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 124.84$ 58.33 52.02$ 1976 SOR-PL2310 1062APROLOGBATCHGRMAR SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 202.76$ 58.33 84.49$ 1977 SOR-PL2310C 1062APROLOG BATCH GRM SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 200.56$ 58.33 83.57$ 1978 SOR-PL2320 20102PROLOGBATCHGMAR SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 263.90$ 58.33 109.97$ 1979 SOR-PL2320C 20102PROLOG BATCH GRM SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 255.76$ 58.33 106.58$ 1980 SOR-PL2410 BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 347.66$ 58.33 144.87$ 1981 SOR-PL2510 BATTERY CHARGR/MAINTR SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 213.70$ 58.33 89.05$ 1982 SOR-PL2520 BATTERY CHARGR/MAINTR SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 256.70$ 58.33 106.97$ 1983 SOR-PL2545 BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 287.74$ 58.33 119.90$ 1984 SOR-PL3730 6/12 WHEEL CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 926.94$ 58.33 386.26$ 1985 SOR-PL3750 6/12/24 WHEEL CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,158.64$ 58.33 482.81$ 1986 SOR-PL4020 MULTI-BANK CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 431.46$ 58.33 179.79$ 1987 SOR-PL5100 HD BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,960.76$ 58.33 817.05$ 1988 SOR-PL6100 BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,655.68$ 58.33 689.92$ 1989 SOR-PLA61 REPLACEMENT CLAMPS SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 18.92$ 58.33 7.88$ 1990 SOR-PLA62 EXTENSION CABLE SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 22.70$ 58.33 9.46$ 1991 SOR-PLA63 CLAMP SET SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 15.10$ 58.33 6.29$

Page 63 of 65 ends

7.E

Page 143 of 459 ends

1992 SOR-PLA64 RING TERMINAL KIT SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 11.24$ 58.33 4.68$ 1993 SOR-SKC1 KNOW HOW CAN INVERTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 70.22$ 58.33 29.26$ 1994 SOR-1852 100A BAT/TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 83.92$ 58.29 35.00$ 1995 SOR-1874 500A BAT/TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 314.16$ 58.29 131.04$ 1996 SOR-1876 1000A BAT/TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 868.46$ 58.29 362.23$ 1997 SOR-BA1 DIGITAL VOLT METER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 54.14$ 58.29 22.58$ 1998 SOR-BA5 BATTERY TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 140.96$ 58.29 58.79$ 1999 SOR-BA6 BATTERY TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 121.92$ 58.29 50.85$ 2000 SOR-BA7 BATT/SYS TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 180.72$ 58.29 75.38$ 2001 SOR-BA9 ELECT/BATT/SYS TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 228.16$ 58.29 95.17$ 2002 SOR-BA227 BATTERY TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 535.84$ 58.29 223.50$ 2003 SOR-BA327 BATT/SYS TEST PRINTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,219.66$ 58.29 508.72$ 2004 SOR-BA327TV BATTERY TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 888.72$ 58.29 370.69$ 2005 SOR-BA427 BATTERY TESTER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,390.76$ 58.29 580.09$ 2006 SOR-BAA3 REPLACEMENT CLAMPS SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 66.66$ 58.29 27.80$ 2007 SOR-BAA7 VOLT PROBE SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 38.16$ 58.29 15.92$ 2008 SOR-BAA8 AMP CLAMP SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 440.88$ 58.29 183.89$ 2009 SOR-PL3760 BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,036.80$ 58.29 432.45$ 2010 SOR-PL4050 SOLAR BATTERY MAINTNR SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 483.20$ 58.29 201.54$ 2011 SOR-PL6800 BATTERY CHARGER SOLAR / CLORE AUTOMOTIVE/LINCOLN/CENTURY(NPC) 1,965.10$ 58.29 819.64$ 2012 SW-130-SWCOV-28XE MACHINE COVER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 462.04$ 60.52 182.41$ 2013 SW-1115-LIGHT LIGHT F/SUPERSINK SW SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 533.84$ 60.52 210.76$ 2014 SW-1120-BASKT SMALL PARTS BASKET SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 45.08$ 60.52 17.80$ 2015 SW-1130-SWCOV-23 MACHINE COVER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 462.04$ 60.52 182.41$ 2016 SW-1130-SWCOV-25 MACHINE COVER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 462.04$ 60.52 182.41$ 2017 SW-1130-SWCOV-28 MACHINE COVER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 462.04$ 60.52 182.41$ 2018 SW-1130-SWCOV-37 MACHINE COVER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 462.04$ 60.52 182.41$ 2019 SW-1278-FUSEH-110 SMARTWASH HEATER FUSE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 7.12$ 60.52 2.81$ 2020 SW-1278-FUSEP SMARTWASHER PUMP FUSE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5.49$ 60.52 2.17$ 2021 SW-3100-OZBST-250 MICROBIAL ENHANCER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 39.56$ 60.52 15.62$ 2022 SW-3335-SCENT-4 SCENT NEUTRALIZER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 52.76$ 60.52 20.83$ 2023 SW-4000-DLYKIT-25 DOLLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 409.42$ 60.52 161.64$ 2024 SW-4475-PMASY-23 PUMP ASSY F/ MODEL 23 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 347.42$ 60.52 137.16$ 2025 SW-4475-PMASY-110 PUMP FOR ALL BUT 23 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 347.42$ 60.52 137.16$ 2026 SW-4650-BRKIT 2ND WORK STATION SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 103.32$ 60.52 40.79$ 2027 SW-1000872 PARTS WASHER KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 799.98$ 60.52 315.83$ 2028 SW-1004879 SNORKEL KIT FOR PUMP SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 15.50$ 60.52 6.12$ 2029 SW-1005052 FALSE BOTTOM SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 131.79$ 60.52 52.03$ 2030 SW-1005062 HEATER BOX ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 70.02$ 60.52 27.64$ 2031 SW-1005065 PARTS WASHER PROBE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 214.88$ 60.52 84.83$ 2032 SW-1005067 PARTS WASHER PROBE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 226.19$ 60.52 89.30$ 2033 SW-1005070 TOGGLE SWITCH SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 21.59$ 60.52 8.52$ 2034 SW-1005072 HEATER KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 214.44$ 60.52 84.66$ 2035 SW-1005073 HEATER KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 214.88$ 60.52 84.83$ 2036 SW-1005074 AIR PUMP SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 383.95$ 60.52 151.58$ 2037 SW-1005079 HOSE CLAMP SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 8.98$ 60.52 3.55$ 2038 SW-1005085 CASTER WITH BRAKE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 36.09$ 60.52 14.25$ 2039 SW-1005087 DOLLY WHEEL SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 34.21$ 60.52 13.51$ 2040 SW-1005089 PARTS WASHER BASKET SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 20.87$ 60.52 8.24$ 2041 SW-1005093 HOSE SHANK SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 29.71$ 60.52 11.73$ 2042 SW-1005094 PARTS WASHER DISC SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 54.65$ 60.52 21.58$ 2043 SW-1005095 VALVE BUSHING SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 9.70$ 60.52 3.83$ 2044 SW-1005097 VALVE MALE BARB SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 14.78$ 60.52 5.84$ 2045 SW-1005099 CLOSE NIPPLE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 6.37$ 60.52 2.51$ 2046 SW-1005115 LID FOR 5-LED SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 31.74$ 60.52 12.53$ 2047 SW-1005116 AIR REGULATOR GAUGE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 86.41$ 60.52 34.11$ 2048 SW-1005117 PARTS WASHER DEFOAMER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 24.49$ 60.52 9.67$ 2049 SW-1005121 HEATER ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 301.30$ 60.52 118.95$ 2050 SW-1005122 CENTRAL ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 1,597.02$ 60.52 630.50$ 2051 SW-1005123 PARTS WASHER FUSE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 551.71$ 60.52 217.82$ 2052 SW-1005124 PARTS WASHER FUSE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 512.27$ 60.52 202.24$ 2053 SW-1005125 PARTS WASHER FUSE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 570.85$ 60.52 225.37$ 2054 SW-1005126 HEATER ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 469.50$ 60.52 185.36$ 2055 SW-1005128 PARTS WASHER HEATER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 471.82$ 60.52 186.27$ 2056 SW-1005132 FALSE BOTTOM SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 229.23$ 60.52 90.50$ 2057 SW-1005133 VALVE KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 24.78$ 60.52 9.78$ 2058 SW-1005135 VALVE KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 24.78$ 60.52 9.78$ 2059 SW-1005136 VALVE KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 15.07$ 60.52 5.95$ 2060 SW-1005140 PUMP ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 383.66$ 60.52 151.47$ 2061 SW-1750038 BRUSH ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 80.90$ 60.52 31.94$ 2062 SW-1750043 BRUSH ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 93.80$ 60.52 37.03$ 2063 SW-1750044 NOZZLE KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 64.95$ 60.52 25.64$ 2064 SW-1750046 STREET ELBOW SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 7.82$ 60.52 3.09$ 2065 SW-1750047 MAT SUPPORT GRID SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 30.00$ 60.52 11.84$ 2066 SW-1750050 PARTS WASHER CLAMP SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 7.53$ 60.52 2.97$ 2067 SW-1750051 DRAIN BASKET SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 56.39$ 60.52 22.26$ 2068 SW-1750052 NOZZLE KIT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 109.32$ 60.52 43.16$ 2069 SW-1750053 PARTS WASHER NIPPLE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 7.24$ 60.52 2.86$ 2070 SW-1750056 HEATER BOX ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 505.60$ 60.52 199.61$ 2071 SW-1750058 BULKHEAD FITTING SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 16.37$ 60.52 6.46$ 2072 SW-1750061 TOGGLE SWITCH BOOT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 16.95$ 60.52 6.69$ 2073 SW-1750062 PART WASHER CONNECTOR SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4.77$ 60.52 1.88$ 2074 SW-1750064 ANGLED BRUSH SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 82.49$ 60.52 32.57$

Page 64 of 65 ends

7.E

Page 144 of 459 ends

2075 SW-1750065 OVERFLOW ASSEMBLY SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 18.55$ 60.52 7.32$ 2076 SW-1750066 POWER CORD SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 87.86$ 60.52 34.69$ 2077 SW-1750067 FALSE BOTTOM SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 148.18$ 60.52 58.50$ 2078 SW-1750068 SINK FITTING SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 106.85$ 60.52 42.18$ 2079 SW-1750069 ANGLED BRUSH SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 170.94$ 60.52 67.49$ 2080 SW-1750070 ANGLED BRUSH SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 58.71$ 60.52 23.18$ 2081 SW-1750987 DEGREASING SOLUTION SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 79.98$ 60.52 31.58$ 2082 SW-1751154 MICROBE PACKETS SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 79.98$ 60.52 31.58$ 2083 SW-1751155 TRANSFORMER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 47.98$ 60.52 18.94$ 2084 SW-1751156 PUMP AND ACCESSORIES SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 79.98$ 60.52 31.58$ 2085 SW-1751157 SCRUB BRUSH SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 55.98$ 60.52 22.10$ 2086 SW-1751164 POWER SWITCH SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 11.98$ 60.52 4.73$ 2087 SW-FL-3 OZZY MAT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 26.36$ 60.52 10.41$ 2088 SW-FL-4 MULTILAYERED OZZY MAT SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 39.56$ 60.52 15.62$ 2089 SW-SW-1 OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 187.92$ 60.52 74.19$ 2090 SW-SW-3 OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 187.92$ 60.52 74.19$ 2091 SW-SW-4 OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 187.92$ 60.52 74.19$ 2092 SW-SW-6 5GAL OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 197.80$ 60.52 78.09$ 2093 SW-SW-7 OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 187.92$ 60.52 74.19$ 2094 SW-SW-8 OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 197.80$ 60.52 78.09$ 2095 SW-SW-123 PARTS/BRAKE WASH-SW1 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,584.20$ 60.52 1,809.84$ 2096 SW-SW-125 PARTS WASHER W/ SW1 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,428.70$ 60.52 1,748.45$ 2097 SW-SW-125C BRAKE WASHER W/SW-1 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,050.74$ 60.52 1,994.03$ 2098 SW-SW-128 PARTS WASHER W/ SW1 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,584.20$ 60.52 1,809.84$ 2099 SW-SW-128XE PARTS WASHER W/ SW1 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,517.22$ 60.52 2,178.20$ 2100 SW-SW-137 MOBIL PRT WASHR W/SW1 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,271.36$ 60.52 2,081.13$ 2101 SW-SW-323 BRAKE WASHER W/SW-3 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,859.30$ 60.52 1,918.45$ 2102 SW-SW-325 PARTS WASHER W/SW-3 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,694.42$ 60.52 1,853.36$ 2103 SW-SW-325C BRAKE WASHER W/SW-3 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,353.78$ 60.52 2,113.67$ 2104 SW-SW-328 PARTS WASHER W/SW-3 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,935.64$ 60.52 1,948.59$ 2105 SW-SW-328XE PARTS WASHER W/SW-3 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,848.24$ 60.52 2,308.89$ 2106 SW-SW-337 MOBIL PRT WASHR W/SW3 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,271.36$ 60.52 2,081.13$ 2107 SW-SW-423 PARTS/BRAKE WASH-SW4 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,859.30$ 60.52 1,918.45$ 2108 SW-SW-425 PARTS WASHER W/ SW4 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,694.42$ 60.52 1,853.36$ 2109 SW-SW-425C PARTS/BRAKE WASH-SW4 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,353.78$ 60.52 2,113.67$ 2110 SW-SW-428 PARTS WASHER W/ SW4 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,935.64$ 60.52 1,948.59$ 2111 SW-SW-428XE PARTS WASHER W/ SW4 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,848.24$ 60.52 2,308.89$ 2112 SW-SW-437 MOBIL PRT WASHR W/SW4 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,271.36$ 60.52 2,081.13$ 2113 SW-SW-623 BRAKE WASHER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,106.50$ 60.52 2,016.05$ 2114 SW-SW-625 MANUAL PARTS WASHER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,859.30$ 60.52 1,918.45$ 2115 SW-SW-625C PARTS WASHER W/ SW-6 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,518.62$ 60.52 2,178.75$ 2116 SW-SW-628 MANUAL PARTS WASHER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,024.10$ 60.52 1,983.51$ 2117 SW-SW-628XE PARTS WASHER W/SW-6 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 6,083.22$ 60.52 2,401.66$ 2118 SW-SW-637 MOBIL PRT WASHR W/SW6 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,436.18$ 60.52 2,146.20$ 2119 SW-SW-723 BRAKE WASHER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,106.50$ 60.52 2,016.05$ 2120 SW-SW-725 PARTS WASHER W/SW-10 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,859.30$ 60.52 1,918.45$ 2121 SW-SW-725C PARTS/BRAKE WASHER SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,518.62$ 60.52 2,178.75$ 2122 SW-SW-728 PARTS WASHER W/SW-9 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,024.10$ 60.52 1,983.51$ 2123 SW-SW-728XE PARTS WASHER W/SW-7 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 6,083.22$ 60.52 2,401.66$ 2124 SW-SW-737 MOBIL PRT WASHR W/SW7 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,271.36$ 60.52 2,081.13$ 2125 SW-SW-823 PARTS/BRAKE WASH-SW8 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,106.50$ 60.52 2,016.05$ 2126 SW-SW-825 PARTS WASHER W/ SW8 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 4,859.30$ 60.52 1,918.45$ 2127 SW-SW-825C PARTS/BRAKE WASH-SW8 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,518.62$ 60.52 2,178.75$ 2128 SW-SW-828 PARTS WASHER W/ SW8 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,024.10$ 60.52 1,983.51$ 2129 SW-SW-828XE PARTS WASHER W/ SW8 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 6,083.22$ 60.52 2,401.66$ 2130 SW-SW-837 MOBIL PRT WASHR W/SW8 SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 5,436.18$ 60.52 2,146.20$ 2131 SW-SW-LF 5GAL OZZY JUICE SMART WASHER / CHEMFREE CORPORATION - NORCROSS, GA 145.08$ 60.52 57.28$

Page 65 of 65 ends

7.E

Page 145 of 459 ends
Page 146 of 459 ends

City of Hemet
City Council Meeting

STAFF REPORT

Meeting: City Council Meeting - Jan 24 2023
Department: Public Works
Submitted by: Eddie Pust, Interim City Manager
Charles Russell, Public Works Operations Manager;

☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing

TITLE:

A Resolution of the City Council of the City of Hemet, California, Awarding the Purchase of Automotive and Truck Parts to Gosch Ford in the amount of $65,000 and Authorizing the Interim City Manager to Execute All Documents Related to the Purchase Order

RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Awarding the Purchase of Automotive and Truck Parts to Gosch Ford in the amount of $65,000 (a $15,000 incr ease from the originally approved $50,000 Purchase Order) and Authorizing the Interim City Manager to Execute All Documents Related to the Purchase Order.

BACKGROUND:

The Fleet Maintenance Division services and maintains over 350 vehicles and pieces of equipment that make up the City's vehicle fleet. The division supports the vehicle preventative maintenance and repair needs for all City Departments, with the largest customer fleets belonging to the Police, Fire and Public Works Departments. The costs of routine maintenance and repair work is anticipated to increase as the City continues to grow its current fleet and prices for parts and supplies continue to rise.

In July of 2022, City staff established a $50,000 purchase order with Gosch Ford for t he purchase of city vehicles parts and supplies during FY 22/23.

ANALYSIS:

Due to the state of the economy, prices for automotive and truck parts have increased more than anticipated, and vendors are predicting that prices will continue to rise through the end of this fiscal year. Staff is now estimating that the Fleet Maintenan ce Division may spend up to an additional $15,000 on top of the originally approved $50,000, totaling $65,000 on automotive and truck parts at Gosch Ford during FY 22/23.

Page 1 of 7 ends

7.F

Page 147 of 459 ends

Gosch Ford is a locally owned business and historically has had the most competitiv e pricing. Using this vendor will also ensure that the Fleet Maintenance Division will be able to receive most factory parts and supplies within one hour of ordering them.

DISCUSSION:

Staff is recommending an award of a blanket purchase order in the a mount of $65,000 to Gosch Ford so that the Fleet Maintenance Division will be able to purchase parts and supplies from Gosch Ford for the City's fleet through the end of the fiscal year.

Authorization by City Council is required for this purchase order a s the recommended award amount exceeds the Interim City Manager's authority per the procurement policy.

STRATEGIC PLAN INTEGRATION:

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

FISCAL IMPACT:

There is no additional General Fund impact. Funding for automotive and truck parts is available in the adopted FY 22/23 Fleet Maintenance Operating Budget fund 684-4550-2350.

ALTERNATIVE(S):

1. Do not authorize the blanket purchase order

2. Provide staff alternative direction

ATTACHMENT(S):

Attachment 1: Resolution

Page 2 of 7 ends

7.F

Page 148 of 459 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Resolution No. 2023-xxx

CITY OF HEMET

HEMET, CALIFORNIA
RESOLUTION NO. 2023-xxx

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF HEMET, CALIFORNIA, AWARDING THE

PURCHASE OF AUTOMOTIVE AND TRUCK PARTS TO
GOSCH FORD IN THE AMOUNT OF $65,000 AND

AUTHORIZING THE INTERIM CITY MANAGER TO

EXECUTE ALL DOCUMENTS REGARDING THE
PURCHASE ORDER.

The City Council of the City of Hemet, California (hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, the Fleet Maintenance Division services and maintains 350 vehicles and pieces of equipment that make up the City’s vehicle fleet; and WHEREAS, due to the economy, prices for automotive and truck parts have increased over the past year and vendors are predicting that prices will continue to rise through the end of this fiscal year; and
WHEREAS, staff is estimating that the Fleet Maintenance Division will spend approximately $65,000 on automotive and truck parts at Gosch Ford during FY 22/23; and
WHEREAS, Gosch Ford is a locally owned business and historically has had the most competitive pricing; and
WHEREAS, staff is recommending an award of a blanket purchase order in the amount of $65,000 to Gosch Ford; and
WHEREAS, funding for automotive and truck parts is available in the adopted FY 22/23 Fleet Maintenance Operating Budget fund 684-4550-2350;

Page 3 of 7 ends

7.F

Page 149 of 459 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Resolution No. 2023-xxx

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HEMET FINDS, DETERMINES, ORDERS AND RESOLVES AS FOLLOWS:

SECTION 1.The above recitals are all true and correct.

SECTION 2.Awards the purchase of automotive and truck parts to Gosch Ford in the amount of $65,000.

SECTION 3.Authorizes the Interim City Manager to execute all documents related to the purchase order.

SECTION 4. This Resolution shall take effect upon its adoption.

Page 4 of 7 ends

7.F

Page 150 of 459 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Resolution No. 2023-xxx
PASSED, APPROVED AND ADOPTED this 24th day of January, 2023. ____________________________
Joe Males, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk

Page 5 of 7 ends

7.F

Page 151 of 459 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Resolution No. 2023-xxx
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 24th day of January, 2023, and was passed by the following vote:

AYES: Council Members:

NOES: Council Members: None.

ABSTAIN: Council Members: None.

ABSENT: Council Members: None.
_____________________________
John Paul Maier, City Clerk

Page 6 of 7 ends

7.F

Page 152 of 459 ends
Page 7 of 7 ends

7.F

Page 153 of 459 ends
Page 154 of 459 ends

City of Hemet
City Council Meeting

STAFF REPORT

Meeting: City Council Meeting - Jan 24 2023
Department: Public Works
Submitted by: Eddie Pust, Interim City Manager
Noah Rau, Public Works Director/City Engineer;

☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing

TITLE:

A Resolution of the City Council of the City of Hemet, California, Approving Replacement Subdivision Improvement Agreement, Acceptance of Public Improvements, Reduction of Improvement Security to 25% of the original value for Tract Map No. 33824, located i n McSweeny Farms, south of McSweeny Parkway and east of South Village Loop (D.R. Horton Los Angeles Holding Company, Inc., a California Corporation), and release of existing Subdivision Improvement Agreement and Improvement Security provided by McSweeny Recovery Acquisition, LLC

RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Approving Replacement Subdivision Improvement Agreement, Acceptance of Public Improvements, Reduction of Improvement Security to 25% of the original value for Tract Map No. 33824, located in McSweeny Farms, south of McSweeny Parkway and east of South Village Loop (D.R. Horton Los Angeles Holding Company, Inc., a California Corporation ), and release of existing Subdivision Improvement Agreement and Improvement Security provided by McSweeny Recovery Acquisition, LLC.

BACKGROUND:

At a regularly scheduled City Council meeting held on September 28, 2016, the City Council approved Tract M ap No. 33824, along with the Subdivision Improvement Agreement ("Agreement"), and accepted the Performance Bond and Material and Labor Bond ("Bonds"). The Agreement was executed by McSweeny Recovery Acquisition, LLC, ("Developer"), who also secured the Bo nds necessary to ensure the public improvements associated with Tract Map No. 33824 would be completed.

The Developer has since sold Tract Map No. 33824 to D.R. Horton Los Angeles Holding Company, Inc., a California Corporation ("Builder"). All of the public improvements have been completed by both the Developer and the Builder to the satisfaction of the City Engineer.

ANALYSIS:

Page 1 of 59 ends

7.G

Page 155 of 459 ends

Tract Map No. 33824 provides for the development of 58 single family residential units and all associated road and utility improvements located in McSweeny Farms Specific Plan Area, south of McSweeny Parkway and east of South Village Loop. Now that the Dev eloper and Builder have completed all of the public improvements associated with the approval of Tract Map No. 33824 to the satisfaction of the City Engineer, the Developer and Builder are requesting a reduction in the Improvement Security to 25% of the or iginal values identified in the original Subdivision Improvement Agreement known as Riverside County Recorder’s Document No. 2016 -0436389 (“Existing Agreement”).

Section 12.2 "Partial Release" of the Existing Agreement allows the City Council to partiall y release a portion of the Improvement Security as the public improvements are accepted by the City. The Developer and Builder filed a Notice of Completion with the Riverside County Recorder's office to signify the completion of public improvements.

DISCUSSION:

The next step in the process is consideration of the replacement of the agreement for the subdivision work and accepting the new reduced bonds to warranty the work per the requirements of the Existing Agreement.

The City Attorney has reviewed and approved the Subdivision Improvement Agreements and the Improvement Bond forms. Staff recommends that the City Council accept the replacement subdivision agreement and public improvement bonds and release the agreement and bonds provided by the Developer

Certified record drawings have been provided for the public improvements as required by Section 10.3 of the Subdivision Improvement Agreement.

PREVIOUS COUNCIL ACTION:

1. City Council meeting of September 28, 2016 - City Council approved Tract Map N o. 33824; subdivision improvement agreement; and accepted offers of dedication and improvement bonds from the developer.

STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

Objective 1: Enhance the visual appearance of the community to make it attractive and reduce blight through construction of new homes.

FISCAL IMPACT:

There are no impacts to the General Fund with this City Council action.

ALTERNATIVE(S):

Page 2 of 59 ends

7.G

Page 156 of 459 ends

1. Do not approve the Resolution to accept the public improvements, replace the Subdivision Improvement Agreement and Improvement Security

2. Provide alternate direction to staff

REVIEWED BY LEGAL:

☒ Staff report ☒ Resolution
☐ Ordinance ☒ Agreement

ATTACHMENT(S):

Attachment 1 - Reso Approving replacement SIA for Final Tract Map 33824-REVISED Attachment 2 - Exhibit A-Subdivision Improvement Agreement - Final Tract Map No. 33824-REVISED Attachment 3 - Exhibit B - mb452_066_070
Attachment 4 - Existing SIA for Tr. 33824 SIA - Recorded 2016

Page 3 of 59 ends

7.G

Page 157 of 459 ends

RIV #4833-2180-7817 v1 - 1 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

CITY OF HEMET
Hemet, California
RESOLUTION NO. 2023-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

HEMET, CALIFORNIA, APPROVING REPLACEMENT

SUBDIVISION IMPROVMENET AGREEMENT,

ACCEPTING PUBLIC IMPROVEMENTS, REDUCTION OF
IMPROVEMENT SECURITY TO 25% OF THE ORIGINAL
VALUE FOR TRACT MAP NO. 33824, LOCATED IN

MCSWEENY FARMS, SOUTH OF MCSWEENY PARKWAY
AND EAST OF SOUTH VILLAGE LOOP (D.R. HORTON
LOS ANGELES HOLDING COMPANY, INC., A

CALIFORNIA CORPORATION), AND RELEASE OF

EXISTING SUBDIVISION IMPROVEMENT AGREEMENT

AND IMPROVEMENTE SECURITY PROVIVDED BY
MCSWEENY RECOVERY ACQUISITION, LLC.

WHEREAS, Tract Map 33824, submitted for approval by McSweeny Recovery Acquisition, LLC., a Delaware Limited Liability Company (“Developer”), and approved by the City of Hemet on September 28, 2016; and
WHEREAS, D.R. Horton Los Angeles Holding, a California Corporation (“Builder”) has acquired the land known as Tract Map 33824 from Developer (a copy of which is attached as Exhibit “B”); and
WHEREAS, the Developer and Builder have completed all the public improvements to the satisfaction of the City Engineer as required by Subdivision Improvement Agreement known as Riverside County Recorder’s Document No. 2016- 0436389 (“Existing Agreement”) and are requesting a reduction of Improvement Security to 25% of the original value for Tract Map No. 33824; and WHEREAS, to meet and continue the requirements established as a prerequisite to final approval of Tract Map No. 33824, Builder agreed to enter into a Subdivision Improvement Agreement superseding and replacing Existing Agreement, together with

Page 4 of 59 ends

7.G

Page 158 of 459 ends

RIV #4833-2180-7817 v1 - 2 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
good and sufficient security, in conformance with the City Attorney’s approved format, for approval and execution by the City; and
WHEREAS, upon recordation of the replacement Subdivision Improvement Agreement and Improvement Security by Builder, the previously recorded Existing Agreement shall be released by the Interim City Manager or designee; and WHEREAS, the Subdivision Improvement Agreement and good and sufficient security have been accepted by the City; and

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HEMET AS FOLLOWS:

SECTION 1. RECITALS
The foregoing recitals are true and correct.

SECTION 2. APPROVAL OF REPLACEMENT SUBDIVISION IMPROVEMENT

AGREEMENT
A. The Subdivision Improvement Agreement attached hereto as Exhibit “A” is approved and the Interim City Manager is authorized to execute it and the City Clerk is authorized to attest thereto.

B. Public Improvements associated with Tract Map No. 33824 that are complete are now to be accepted by the City
C. Said improvement security shall be reduced to 25% of the original value and is accepted as good and sufficient, subject to approval as to form and content thereof by the City Attorney,
D. Upon recordation of the Replacement Subdivision Improvement Agreement, the Interim City Manager, or his designee, is authorized to release the existing Subdivision Improvement Agreement and Improvement Security.

E. Pursuant to Government Code Section 66458, Tract Map No. 33824 was previously approved, and City accepted the real property described therein.

SECTION 3. CERTIFICATION
This Resolution shall take effect immediately upon its adoption by the City Council. The

Page 5 of 59 ends

7.G

Page 159 of 459 ends

RIV #4833-2180-7817 v1 - 3 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City Clerk shall attest to and certify the vote adopting this Resolution.

Page 6 of 59 ends

7.G

Page 160 of 459 ends

RIV #4833-2180-7817 v1 - 4 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
PASSED, APPROVED AND ADOPTED this 24th day of January 2023.

Joe Males, Mayor
ATTEST: APPROVED AS TO FORM:
_____________________________
John Paul Maier, City Clerk Steven Graham, City Attorney

Page 7 of 59 ends

7.G

Page 161 of 459 ends

RIV #4833-2180-7817 v1 - 5 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 24th day of January 2023 and was passed by the following vote:

AYES: Council Members:

NOES: Council Member:

ABSTAIN: Council Member:

ABSENT: Council Member:
_________________________________
John Paul Maier, City Clerk

Page 8 of 59 ends

7.G

Page 162 of 459 ends

RIV #4830-8901-9593 v1

RECORDED AT THE REQUEST OF
AND WHEN RECORDED RETURN TO:
(Document exempt from recording fees
pursuant to Cal. Gov. Code § 27383)

CITY OF HEMET
Attn: City Manager
445 East Florida Avenue
Hemet, California 92543
THIS SPACE FOR RECORDER’S USE ONLY

SUBDIVISION IMPROVEMENT AGREEMENT
FINAL TRACT MAP 33824
By and Between

THE CITY OF HEMET,
a municipal corporation
and
D.R. HORTON LOS ANGELES HOLDING COMPANY, INC.,

A CALIFORNIA CORPORATION
DATED January 24, 2023

Page 9 of 59 ends

7.G

Page 163 of 459 ends

RIV #4830-8901-9593 v1
- 1 -

SUBDIVISION IMPROVEMENT AGREEMENT
FINAL TRACT MAP 33824
This Subdivision Improvement Agreement (“Agreement”) is entered into as of this 24th day of January 2023 by and between the City of Hemet, a municipal corporation (“City”) and D.R. Horton Los Angeles Holding Company, Inc., a California corporation (“Builder”). City and Builder are sometimes hereinafter individually referred to as “Party” and hereinafter collectively referred to as the “Parties.”

RECITALS
A. City of Hemet has previously approved Tract Map No. 33824 on September 28, 2016, along with proper and sufficient security.

B. McSweeny Recovery Acquisition, LLC, a Delaware Limited Liability Company, (“Developer”) has not completed all of the work or made all of the Public Improvements required by the Subdivision Map Act (Government Code sections 66410 et seq.), (“Map Act”) the City Ordinances, the conditions of approval for Tract No. 33824, or other ordinances, resolutions, or policies of City requiring construction of improvements in conjunction with the subdivision of land.

C. Builder has acquired the land known as Tract Map 33824 from Developer.

D. The City desires to enter into this Agreement amending and superseding the Subdivision Improvement Agreement by and between the City of Hemet, a municipal corporation and Developer, also known as Riverside County Recorder Office Document No. 2016-0436389 (“Original Subdivision Improvement Agreement”).

E. Builder has not completed all of the work or made all of the Public Improvements required by the Subdivision Map Act (Government Code sections 66410 et seq.), (“Map Act”) the City Ordinances, the conditions of approval for Tract No. 33824, or other ordinances, resolutions, or policies of City requiring construction of improvements in conjunction with the subdivision of land.

F. Pursuant to City Ordinances and the applicable provisions of the Map Act, Builder and City enter into this Agreement for the timely construction and completion of the Public Improvements and the furnishing of the security therefor, acceptable to the City Engineer and City Attorney, for Tract Map No. 33824.

G. City has authority to enter into this Subdivision Improvement Agreement pursuant to Government Code Sections 66499 – 66499.10.

H. Pursuant to Government Code Section 66499, Builder’s execution of this Agreement and the provision of the security are made in consideration of City’s approval of the final map for Tract Map No. 33824.

Page 10 of 59 ends

7.G

Page 164 of 459 ends

RIV #4830-8901-9593 v1
- 2 -

DEFINED TERMS
“Builder” shall mean D.R. Horton Los Angeles Holding Company, Inc., a California corporation. The term “Builder” shall also include all assignees, to the extent permitted under this Agreement, of the rights and obligations of Builder under this Agreement, and any successor-in-interest to Builder having a legal and/or equitable interest in the Property. “Developer” shall mean McSweeny Recovery Acquisition, LLC, a Delaware Limited Liability Company. The term “Developer” shall also include all assignees, to the extent permitted under this Agreement, of the rights and obligations of Developer under this Agreement, and any successor-in-interest to Developer having a legal and/or equitable interest in the Property. “Estimated Costs” shall mean the City Engineer’s approximation of the actual cost to construct the Public Improvements, including the replacement cost for all landscaping. “Litigation Expenses” shall mean all costs and expenses, to the extent reasonable in amount, actually and necessarily incurred by a party in good faith in the prosecution of an action or proceeding, including, but not limited to, court costs, filing, recording, and service fees, copying costs, exhibit production costs, special media rental costs, attorneys’ fees, fees for investigators, witness fees (both lay and expert), travel expenses, deposition and transcript costs and any other cost or expense, the award of which a court of competent jurisdiction may determine to be just and reasonable.
“Map Act” shall mean the Subdivision Map Act, Government Code Sections 66410 et seq. “Property” shall mean the all of the real property contained within the boundaries of Tract Map No. 33824 located in the City of Hemet, California, as is more particularly described in the legal description and parcel diagram attached hereto and incorporated hereby by reference at Attachment “A”.
“Public Improvements” shall include, but not be limited to, recertification of rough graded pads, finish grade, repair existing streets, curbs and gutters, sidewalks, water systems, sanitary sewers, utilities, and drainage facilities (if any), landscaping, street lights and all other facilities required to be constructed and dedicated to the City or other public entity as conditions of approval of Tentative Tract Map No. 33824 and as shown in detail on the plans, and specifications which have been approved by the City and incorporated into Tract Map No. 33824. The Parties agree that the Public Improvements to be completed by Builder are more specifically described in the diagram or plan attached hereto and incorporated herein by reference as Attachment “B.

Notwithstanding, Attachment “B”, Builder shall remain obligated to construct and complete all of the Public Improvements required as conditions of approval for Tract Map No. 33824, a full copy of which is on file with and may be obtained from the Engineering Department of the City of Hemet.
“Required Insurance” shall mean the insurance required to be maintained by Builder under Section 17.
“Security” shall mean surety bonds in the amounts and under the terms of Section 12 or other security approved by City Engineer or City Attorney.

Page 11 of 59 ends

7.G

Page 165 of 459 ends

RIV #4830-8901-9593 v1
- 3 -
“Tract No 33824.” shall mean the final map prepared and approved by the City for tentative tract map no. 33824.
“Warranty” shall mean the one year period following completion of the Public Improvements by Builder and the acceptance of the Public Improvements by the City in which Builder warrants and guarantees all Public Improvements.

OPERATIVE PROVISIONS
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the parties and contained here and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:

1.SUPERSESSION. This Agreement supersedes and replaces the Original Subdivision Improvement Agreement in its entirety. Upon execution of this Agreement by the Builder, the Original Subdivision Improvement Agreement shall be of no further force and effect unless reinstated.

2.EFFECTIVENESS. This Agreement shall not be effective unless and until all four (4) of the following conditions are satisfied in the order provided:

2.1Security. Builder provides City with the Security of the type and in the amounts required by this Agreement;

2.2Final Map and Agreement Approval. The City Council of the City of Hemet (“City Council”) previously approved the final map for Tract Map No. 33824 and now approves this Agreement;

2.3Record Agreement. Builder and City execute the Agreement and City records this Agreement in the Recorder’s Office of the County of Riverside; and If the above described conditions are not satisfied in the order, manner and within the time provided under this Agreement, this Agreement shall automatically terminate without need of further action by either City or Builder.

3.PUBLIC IMPROVEMENTS. Builder shall construct or have constructed at its own cost, expense, and liability the Public Improvements, as defined herein, within the time and in the manner required under this Agreement. Construction of the Public Improvements shall include any transitions and/or other incidental work deemed necessary for drainage or public safety. The Builder shall be responsible for the replacement, relocation, or removal of any component of any irrigation water or sewer system in conflict with the construction or installation of the Public Improvements. Such replacement, relocation, or removal shall be performed to the complete satisfaction of the City Engineer and the owner of such water or sewer system. Builder further promises and agrees to provide all equipment, tools, materials, labor, tests, design work, and engineering services necessary or required by City to fully and adequately complete the Public Improvements.

3.1Prior Partial Construction of Public Improvements. Where construction of any Public Improvements has been partially completed prior to this Agreement,

Page 12 of 59 ends

7.G

Page 166 of 459 ends

RIV #4830-8901-9593 v1
- 4 -
Builder agrees to complete such Public Improvements or assure their completion in accordance with this Agreement.

3.2Permits; Notices; Utility Statements. Prior to commencing any work, Builder shall, at its sole cost, expense, and liability, obtain all necessary permits and approvals and give all necessary and incidental notices required for the lawful construction of the Public Improvements and performance of Builder’s obligations under this Agreement. Builder shall conduct the work in full compliance with the regulations, rules, and other requirements contained in any permit or approval issued to Builder. Prior to commencing any work, Builder shall file a written statement with the City Clerk and the City Engineer, signed by Builder and each utility which will provide utility service to the Property, attesting that Builder has made all deposits legally required by the utility for the extension and provision of utility service to the Property.

3.3Pre-approval of Plans and Specifications. Builder is prohibited from commencing work on any Public Improvement until all plans and specifications for such Public Improvement have been submitted to and approved by the City Engineer, or his or her designee.

Approval by the City Engineer shall not relieve Builder from ensuring that all Public Improvements conform with all other requirements and standards set forth in this Agreement.

3.4Quality of Work; Compliance With Laws and Codes. The construction plans and specifications for the Public Improvements shall be prepared in accordance with all applicable federal, state and local laws, ordinances, regulations, codes, standards, and other requirements. The Public Improvements shall be completed in accordance with all approved maps, plans, specifications, standard drawings, and special amendments thereto on file with City, as well as all applicable federal, state, and local laws, ordinances, regulations, codes, standards, and other requirements applicable at the time work is actually commenced.

3.5Standard of Performance. Builder and its contractors, if any, shall perform all work required to construct the Public Improvements under this Agreement in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Builder represents and maintains that it or its contractors shall be skilled in the professional calling necessary to perform the work. Builder warrants that all of its employees and contractors shall have sufficient skill and experience to perform the work assigned to them, and that they shall have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the work, and that such licenses, permits, qualifications and approvals shall be maintained throughout the term of this Agreement.

3.6Alterations to Improvements. All work shall be done and improvements made and completed as shown on approved plans and specifications, and any subsequent alterations thereto. If during the course of construction and installation of the Public Improvements it is determined that the public interest requires alterations in the Public Improvements, Builder shall undertake such design and construction changes as may be reasonably required by City. Any and all alterations in the plans and specifications and the Public Improvements to be completed may be accomplished without giving prior notice thereof to Builder’s surety for this Agreement.

Page 13 of 59 ends

7.G

Page 167 of 459 ends

RIV #4830-8901-9593 v1
- 5 -

4.MAINTENANCE OF PUBLIC IMPROVEMENTS AND LANDSCAPING.

City shall not be responsible or liable for the maintenance or care of the Public Improvements until City formally approves and accepts them in accordance with its policies and procedures.

City shall exercise no control over the Public Improvements until approved and accepted. Any use by any person of the Public Improvements, or any portion thereof, shall be at the sole and exclusive risk of the Builder at all times prior to City’s acceptance of the Public Improvements.

Builder shall maintain all the Public Improvements in a state of good repair until they are completed by Builder and approved and accepted by City, and until the security for the performance of this Agreement is released. Maintenance shall include, but shall not be limited to, repair of pavement, curbs, gutters, sidewalks, signals, parkways, water mains, and sewers; maintaining all landscaping in a vigorous and thriving condition reasonably acceptable to City; removal of debris from sewers and storm drains; and sweeping, repairing, and maintaining in good and safe condition all streets and street improvements. It shall be Builder’s responsibility to initiate all maintenance work, but if it shall fail to do so, it shall promptly perform such maintenance work when notified to do so by City. If Builder fails to properly prosecute its maintenance obligation under this section, City may do all work necessary for such maintenance and the cost thereof shall be the responsibility of Builder and its surety under this Agreement.

City shall not be responsible or liable for any damages or injury of any nature in any way related to or caused by the Public Improvements or their condition prior to acceptance.

5.CONSTRUCTION SCHEDULE. Unless extended pursuant to this Section 4.1 of this Agreement, Builder shall fully and adequately complete or have completed the Public Improvements within three (3) years (36 months) following approval of the final map for Tract No. 33824.

5.1Extensions. City may, in its sole and absolute discretion, provide Builder with additional time within which to complete the Public Improvements. It is understood that by providing the Security required under Section 12.0 et seq. of this Agreement, Builder and its surety consent in advance to any extension of time as may be given by City to Builder, and waives any and all right to notice of such extension(s). Builder’s acceptance of an extension of time granted by City shall constitute a waiver by Builder and its surety of all defense of laches, estoppel, statutes of limitations, and other limitations of action in any action or proceeding filed by City following the date on which the Public Improvements were to have been completed hereunder. In addition, as consideration for granting such extension to Builder, City reserves the right to review the provisions of this Agreement, including, but not limited to, the construction standards, the cost estimates established by City, and the sufficiency of the improvement security provided by Builder, and to require adjustments thereto when warranted according to City’s reasonable discretion.

5.2Accrual of Limitations Period. Any limitations period provided by law related to breach of this Agreement or the terms thereof shall not accrue until Builder has provided the City Engineer with written notice of Builder’s intent to abandon or otherwise not complete required or agreed upon Public Improvements.

5.3 Builder Obligations Do Not Terminate. Notwithstanding the construction schedule and option for extensions provided in Sections 4.1 and 4.2, Builder’s failure to complete the Public Improvements or to otherwise satisfy all conditions of approval, or City’s non-extension of the time referenced in those sections shall not terminate or otherwise

Page 14 of 59 ends

7.G

Page 168 of 459 ends

RIV #4830-8901-9593 v1
- 6 -
relieve the Builder of the obligation to complete the Public Improvements and conditions of approval and such obligations shall survive the term of this Agreement and shall survive until satisfied in full unless waived or modified by formal action of the City Council.

6.GRADING. Builder agrees that any and all grading done or to be done in conjunction with construction of the Public Improvements or development of Tract Map No. 33824 shall conform to all federal, state, and local laws, ordinances, regulations, and other requirements, including City’s grading regulations. All grading, landscaping, and construction activities shall be performed in a manner to control erosion and prevent flooding problems. The City Engineer shall have the authority to require erosion plans to prescribe reasonable controls on the method, manner, and time of grading, landscaping, and construction activities to prevent nuisances to surrounding properties. Plans shall include without limitation temporary drainage and erosion control requirements, dust control procedures, restrictions on truck and other construction traffic routes, noise abatement procedures, storage of materials and equipment, removal of garbage, trash, and refuse, securing the job site to prevent injury, and similar matters.

In order to prevent damage to the Public Improvements by improper drainage or other hazards, the grading shall be completed in accordance with the time schedule for completion of the Public Improvements established by this Agreement, and prior to City’s approval and acceptance of the Public Improvements and release of the Security as set forth in Section 12.0 et seq. of this Agreement.

7.UTILITIES. Builder shall provide utility services, including water, sewer, power, gas, and telephone service to serve each parcel, lot, or unit of land within Tract Map No. 33824 in accordance with all applicable federal, state, and local laws, rules, and regulations, including, but not limited to, the regulations, schedules and fees of the utilities or agencies providing such services. Except for commercial or industrial properties, Builder shall also provide cable television facilities to serve each parcel, lot, or unit of land in accordance with all applicable federal, state, and local laws, rules, and regulations, including, but not limited to, the requirements of the cable company possessing a valid franchise with City to provide such service within City’s jurisdictional limits. All utilities shall be installed underground.

8.FEES AND CHARGES. Builder shall, at its sole cost, expense, and liability, pay all fees, charges, and taxes arising out of construction of the Public Improvements, including, but not limited to, all plan check, design review, engineering, inspection, and other service fees, and any impact or connection fees established by City ordinance, resolution, regulation, or policy, or as established by City relative to Tract Map No. 33824, or as required by other governmental agencies having jurisdiction over Tract Map No. 33824.

9.CITY INSPECTION OF PUBLIC IMPROVEMENTS. Builder shall, at its sole cost, expense, and liability, and at all times during construction of the Public Improvements, maintain reasonable and safe facilities and provide safe access for inspection by City of the Public Improvements and areas where construction of the Public Improvements is occurring or will occur. If the City inspector requests it, the Builder at any time before acceptance of the Public Improvements shall remove or uncover such portions of the finished work as may be directed which have not previously been inspected. After examination, the Builder shall restore said portions of the work to the standards required hereunder. Inspection or supervision by the City shall not be considered as direct control of the individual workmen on the job site. City’s inspector shall have the authority to stop any and all work not in accordance with the

Page 15 of 59 ends

7.G

Page 169 of 459 ends

RIV #4830-8901-9593 v1
- 7 -
requirements contained or referenced in this Agreement. The inspection of the work by City shall not relieve Builder or the contractor of any obligations to fulfill this Agreement as herein provided, and unsuitable materials or work may be rejected notwithstanding that such materials or work may have been previously overlooked or accepted.

10.ADMINISTRATIVE COSTS. If Builder fails to construct and install all or any part of the Public Improvements within the time required by this Agreement, or if Builder fails to comply with any other obligation contained herein, Builder and its surety shall be jointly and severally liable to City for all administrative expenses, fees, and costs, including reasonable attorney’s fees and costs, incurred in obtaining compliance with this Agreement or in processing any legal action or for any other remedies permitted by law.

11.ACCEPTANCE OF IMPROVEMENTS; AS-BUILT OR RECORD
DRAWINGS. The City Council may, in its sole and absolute discretion, accept fully completed portions of the Public Improvements prior to such time as all of the Public Improvements are complete, which shall not release or modify Builder’s obligation to complete the remainder of the Public Improvements within the time required by this Agreement.

11.1Builder’s Notice of Completion. Upon the total or partial acceptance of the Public Improvements by City, Builder shall file with the Recorder’s Office of the County of Riverside a notice of completion for the accepted Public Improvements in accordance with California Civil Code section 3093, at which time the accepted Public Improvements shall become the sole and exclusive property of City without payment therefor.

11.2City Acceptance of Public Improvements. If Tract Map No. 33824 was approved and recorded as a single phase map, City shall not accept any one or more of the improvements until all of the Public Improvements are completed by Builder and approved by City. Issuance by City of occupancy permits for any buildings or structures located on the Property shall not be construed in any manner to constitute City’s acceptance or approval of any Public Improvements.

11.3Builder’s Obligation to Provide As-Built or Record Drawings.

Notwithstanding the foregoing, City may not accept any Public Improvements unless and until Builder provides one (1) set of “as-built” or record drawings or plans to the City Engineer for all such Public Improvements. The drawings shall be certified and shall reflect the condition of the Public Improvements as constructed, with all changes incorporated therein.

12.WARRANTY AND GUARANTEE. Builder hereby warrants and guarantees all Public Improvements against any defective work or labor done, or defective materials furnished in the performance of this Agreement, including the maintenance of all landscaping within the Property in a vigorous and thriving condition reasonably acceptable to City, for a period of one (1) year following completion of the work and acceptance by City. During the Warranty, Builder shall repair, replace, or reconstruct any defective or otherwise unsatisfactory portion of the Public Improvements, in accordance with the current ordinances, resolutions, regulations, codes, standards, or other requirements of City, and to the approval of the City Engineer. All repairs, replacements, or reconstruction during the Warranty shall be at the sole cost, expense, and liability of Builder and its surety. As to any Public Improvements which have been repaired, replaced, or reconstructed during the Warranty, Builder and its surety hereby agree to extend the

Page 16 of 59 ends

7.G

Page 170 of 459 ends

RIV #4830-8901-9593 v1
- 8 -
Warranty for an additional one (1) year period following City’s acceptance of the repaired, replaced, or reconstructed Public Improvements. Nothing herein shall relieve Builder from any other liability it may have under federal, state, or local law to repair, replace, or reconstruct any Public Improvement following expiration of the Warranty or any extension thereof. Builder’s warranty obligation under this section shall survive the expiration or termination of this Agreement.

13.SECURITY; SURETY BONDS. Prior to City’s approval and execution of this Agreement, Builder shall provide City with surety bonds in the amounts and under the terms set forth below. The amount of the Security shall be based on the City Engineer’s Estimated Costs.

If City determines at any time prior to Builder’s completion of the Public Improvements under Section 4 [Construction Schedule], in its sole and absolute discretion, that the Estimated Costs have changed, Builder shall adjust the Security in the amount requested by City. Builder’s compliance with this provision (Section 12.0 et seq.) shall in no way limit or modify Builder’s indemnification obligation provided in Section 16.0 of this Agreement.

13.1Performance Bond. To guarantee the faithful performance of the Public Improvements and all the provisions of this Agreement, to protect City if Builder is in default as set forth in Section 18.0 et seq. of this Agreement, and to secure Builder’s one-year guarantee and warranty of the Public Improvements, including the maintenance of all landscaping in a vigorous and thriving condition, Builder shall provide City a faithful performance bond in the amount of Two Hundred Forty-Six Thousand Dollars, ($246,000), which sum shall be not less than one hundred percent (100%) of the Estimated Costs.

13.2Partial Release. The City Council may, in its sole and absolute discretion and upon recommendation of the City Engineer, partially release a portion or portions of the Security provided under this section as the Public Improvements are accepted by City, provided that Builder is not in default on any provision of this Agreement or condition of approval for Tract Map No. 33824, and the total remaining Security is not less than twenty-five percent (25%) of the Estimated Costs. All Security provided under this section shall be released at the end of the Warranty period, or any extension thereof as provided in Section 11.0 of this Agreement, provided that Builder is not in default on any provision of this Agreement or condition of approval for Tract Map No. 33824.

13.3Labor & Material Bond. To secure payment to the contractors, subcontractors, laborers, material men, and other persons furnishing labor, materials, or equipment for performance of the Public Improvements and this Agreement, Builder shall provide City a labor and materials bond in the amount of, which sum shall not be less than one hundred percent (100%) of the Estimated Costs. The Security provided under this section may be released by written authorization of the City Engineer after six (6) months from the date City accepts the final Public Improvements. The amount of such Security shall be reduced by the total of all stop notice or mechanic’s lien claims of which City is aware, plus an amount equal to twenty percent (20%) of such claims for reimbursement of City’s anticipated administrative and legal expenses arising out of such claims.

13.4Additional Requirements. The surety for any surety bonds provided as Security shall have a current A.M. Best’s rating of no less than A:VIII, be a bank or insurance

Page 17 of 59 ends

7.G

Page 171 of 459 ends

RIV #4830-8901-9593 v1
- 9 -
company licensed to transact surety business in California, and shall be satisfactory to City. As part of the obligation secured by the Security and in addition to the face amount of the Security, the Builder or its surety shall secure the costs and reasonable expenses and fees, including reasonable attorney’s fees and costs, incurred by City in enforcing the obligations of this Agreement. The Builder and its surety stipulate and agree that no change, extension of time, alteration, or addition to the terms of this Agreement, the Public Improvements, or the plans and specifications for the Public Improvements shall in any way affect its obligation on the Security.

13.5Form of Security. The evidence of the Security shall be provided on the forms set forth in Attachment “C”, unless other forms are deemed acceptable by the City Engineer and the City Attorney, and when such forms are completed to the satisfaction of City, the forms and evidence of the Security shall be attached hereto as Attachment “C” and incorporated herein by this reference.

13.6Builder’s Liability. While no action of Builder shall be required in order for City to realize on its security under any Security instrument, Builder agrees to cooperate with City to facilitate City’s realization under any Security instrument, and to take no action to prevent City from such realization under any Security instrument. Notwithstanding the giving of any Security instrument or the subsequent expiration of any Security instrument or any failure by any surety or financial institution to perform its obligations with respect thereto, Builder shall be personally liable for performance under this Agreement and for payment of the cost of the labor and materials for the improvements required to be constructed or installed hereby and shall, within ten (10) days after written demand therefor, deliver to City such substitute Security as City shall require satisfying the requirements in this Section 12.

14.MONUMENT SECURITY. Prior to City’s execution of this Agreement, to guarantee payment to the engineer or surveyor for the setting of all subdivision boundaries, lot corners, and street centerline monuments for Tract No. 33824 in compliance with the applicable provisions of City’s Municipal and/or Development Code (“Subdivision Monuments”), Builder shall deposit cash with City in the amount of Nineteen Thousand Two-Hundred Fifty Dollars ($19,250), which sum shall not be less than one hundred percent (100%) of the costs of setting the Subdivision Monuments as determined by the City Engineer. Said cash deposit may be released by written authorization of the City Engineer after all required Subdivision Monuments are accepted by the City Engineer, City has received written acknowledgment of payment in full from the engineer or surveyor who set the Subdivision Monuments, and provided Builder is not in default of any provision of this Agreement or condition of approval for Tract Map No. 33824.

15.LIEN. To secure the timely performance of Builder’s obligations under this Agreement, including those obligations for which security has been provided pursuant to Sections 12.0 et seq. and 13.0 of this Agreement, Builder hereby creates in favor of City a lien against all portions of the Property not dedicated to City or some other governmental agency for a public purpose. As to Builder’s default on those obligations for which security has been provided pursuant to Sections 12.0 et seq. and 13.0 of this Agreement, City shall first attempt to collect against such security prior to exercising its rights as a contract lienholder under this section.

16.SIGNS AND ADVERTISING. Builder understands and agrees to City’s ordinances, regulations, and requirements governing signs and advertising structures. Builder

Page 18 of 59 ends

7.G

Page 172 of 459 ends

RIV #4830-8901-9593 v1
- 10 -
hereby agrees with and consents to the summary removal by City, without notice to Builder, of all signs or other advertising structures erected, placed, or situated in violation of any City ordinance, regulation, or other requirement. Removal shall be at the expense of Builder and its surety. Builder and its surety shall indemnify and hold City free and harmless from any claim or demand arising out of or incident to signs, advertising structures, or their removal.

17.INDEMNIFICATION. Builder shall defend, indemnify, and hold harmless City, its elected officials, officers, employees, and agents from any and all actual or alleged claims, demands, causes of action, liability, loss, damage, or injury, to property or persons, including wrongful death, whether imposed by a court of law or by administrative action of any federal, state, or local governmental body or agency, arising out of or incident to any acts, omissions, negligence, or willful misconduct of Builder, its personnel, employees, agents, or contractors in connection with or arising out of construction or maintenance of the Public Improvements, or performance of this Agreement. This indemnification includes, without limitation, the payment of all penalties, fines, judgments, awards, decrees, attorneys’ fees, and related costs or expenses, and the reimbursement of City, its elected officials, officers, employees, and/or agents for all legal expenses and costs incurred by each of them. This indemnification excludes only such portion of any claim, demand, cause of action, liability, loss, damage, penalty, fine, or injury, to property or persons, including wrongful death, which is caused solely and exclusively by the gross negligence or willful misconduct of City as determined by a court or administrative body of competent jurisdiction. Builder’s obligation to indemnify City shall survive the expiration or termination of this Agreement, and shall not be restricted to insurance proceeds, if any, received by City, its elected officials, officers, employees, or agents.

18.INSURANCE.

18.1Types; Amounts. Builder shall procure and maintain, and shall require its contractors to procure and maintain, during construction of any Public Improvement pursuant to this Agreement, insurance of the types and in the amounts described below. If any of the Required Insurance contains a general aggregate limit, such insurance shall apply separately to this Agreement or be no less than two times the specified occurrence limit.

18.1.1General Liability. Builder and its contractors shall procure and maintain occurrence version general liability insurance, or equivalent form, with a combined single limit of not less than $3,000,000 per occurrence for bodily injury, personal injury, and property damage.

18.1.2Business Automobile Liability. Builder and its contractors shall procure and maintain business automobile liability insurance, or equivalent form, with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for the ownership, operation, maintenance, use, loading, or unloading of any vehicle owned, leased, hired, or borrowed by the insured or for which the insured is responsible.

18.1.3Workers’ Compensation. Builder and its contractors shall procure and maintain workers’ compensation insurance with limits as required by the Labor Code of the State of California and employers’ liability insurance with limits of not less than $1,000,000 per occurrence, at all times during which insured retains employees.

Page 19 of 59 ends

7.G

Page 173 of 459 ends

RIV #4830-8901-9593 v1
- 11 -

18.1.4Professional Liability. For any consultant or other professional who will engineer or design the Public Improvements, liability insurance for errors and omissions with limits not less than $1,000,000 per occurrence, shall be procured and maintained for a period of five (5) years following completion of the Public Improvements. Such insurance shall be endorsed to include contractual liability.

18.2Deductibles. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: (a) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its elected officials, officers, employees, agents, and volunteers; or (b) Builder and its contractors shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigation costs, claims, and administrative and defense expenses.

18.3Additional Insured; Separation of Insureds. The Required Insurance shall name City, its elected officials, officers, employees, agents, and volunteers as additional insureds with respect to work performed by or on behalf of Builder or its contractors, including materials, parts, or equipment furnished in connection therewith. The Required Insurance shall contain standard separation of insured provisions, and shall contain no special limitations on the scope of its protection to City, its elected officials, officers, employees, agents, and volunteers.

18.4Primary Insurance; Waiver of Subrogation. The Required Insurance shall be primary with respect to any insurance or self-insurance programs covering City, its elected officials, officers, employees, agents, and volunteers. All policies for the Required Insurance shall provide that the insurance company waives all right of recovery by way of subrogation against City in connection with any damage or harm covered by such policy.

18.5Certificates; Verification. Builder and its contractors shall furnish City with original certificates of insurance and endorsements effecting coverage for the Required Insurance. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. All certificates and endorsements must be received and approved by City before work pursuant to this Agreement can begin. City reserves the right to require complete, certified copies of all required insurance policies, at any time.

18.6Term; Cancellation Notice. Builder and its contractors shall maintain the Required Insurance for the term of this Agreement and shall replace any certificate, policy, or endorsement which will expire prior to that date. All policies shall be endorsed to provide that the Required Insurance shall not be suspended, voided, reduced, canceled, or allowed to expire except on 30 days’ prior written notice to City.

18.7Insurer Rating. Unless approved in writing by City, all Required Insurance shall placed with insurers licensed to do business in the State of California and with a current A.M. Best rating of at least A:VIII.

19.DEFAULT; NOTICE; REMEDIES.

19.1Notice. If Builder neglects, refuses, or fails to fulfill or timely complete any obligation, term, or condition of this Agreement, or if City determines there is a violation of any federal, state, or local law, ordinance, regulation, code, standard, or other requirement, City

Page 20 of 59 ends

7.G

Page 174 of 459 ends

RIV #4830-8901-9593 v1
- 12 -
may at any time thereafter declare Builder to be in default or violation of this Agreement and make written demand upon Builder or its surety, or both, to immediately remedy the default or violation. Builder shall commence the work required to remedy the default or violation within ten (10) days of the written demand from the City. If the default or violation constitutes an immediate threat to the public health, safety, or welfare, City may provide the demand verbally, and Builder shall commence the required work within twenty-four (24) hours thereof.

Immediately upon City’s issuance of the demand to remedy the default, Builder and its surety shall be liable to City for all costs of construction and installation of the Public Improvements and all other administrative costs expenses as provided for in Section 9.0 of this Agreement.

19.2Failure to Remedy; City Action. If the work required to remedy the noticed default or violation is not diligently prosecuted to a substantial completion acceptable to City within a reasonable time designated by the City, City may complete all remaining work, arrange for the completion of all remaining work, and/or conduct such remedial activity as in its sole and absolute discretion it believes is required to remedy the default or violation. All such work or remedial activity shall be at the sole and absolute cost, expense, and liability of Builder and its surety, without the necessity of giving any further notice to Builder or surety. City’s right to take such actions shall in no way be limited by the fact that Builder or its surety may have constructed any, or none of the required or agreed upon Public Improvements at the time of City’s demand for performance. In the event City elects to complete or arrange for completion of the remaining work and improvements, City may require all work by Builder or its surety to cease in order to allow adequate coordination by City. Notwithstanding the foregoing, if conditions precedent for reversion to acreage can be met and if the interests of City will not be prejudiced thereby, City may also process a reversion to acreage and thereafter recover from Builder or its surety the full cost and expense incurred.

19.3Other Remedies. No action by City pursuant to Section 18.0 et seq. of this Agreement shall prohibit City from exercising any other right or pursuing any other legal or equitable remedy available under this Agreement or any federal, state, or local law. City may exercise it rights and remedies independently or cumulatively, and City may pursue inconsistent remedies. City may institute an action for damages, injunctive relief, or specific performance.

20.GENERAL PROVISIONS.

20.1Authority to Enter Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority make this Agreement and bind each respective Party.

20.2Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate, or convenient to attain the purposes of this Agreement.

20.3Construction; References; Captions. It being agreed the Parties or their agents have participated in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party.

Any term referencing time, days, or period for performance shall be deemed calendar days and not work days. All references to Builder include all personnel, employees, agents, and subcontractors of Builder, except as otherwise specified in this Agreement. All references to

Page 21 of 59 ends

7.G

Page 175 of 459 ends

RIV #4830-8901-9593 v1
- 13 -
City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

20.4Notices. All notices, demands, invoices, and written communications shall be in writing and delivered to the following addresses or such other addresses as the Parties may designate by written notice:

CITY:

City of Hemet
Attn: City Manager
445 E. Florida Avenue
Hemet, CA 92543
BUILDER:

D.R. Horton Los Angeles Holding Company, Inc., a California corporation Attn:
2280 Wardlow Circle, Suite 100
Corona, CA 92880
Depending upon the method of transmittal, notice shall be deemed received as follows: by facsimile, as of the date and time sent provided the original is contemporaneously deposited with United States Postal Service and delivered by regular mail; by messenger, as of the date delivered; and by U.S. Mail first class postage prepaid, as of 72 hours after deposit in the U.S.

Mail.

20.5Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

20.6Waiver. City’s failure to insist upon strict compliance with any provision of this Agreement or to exercise any right or privilege provided herein, or City’s waiver of any breach of this Agreement, shall not relieve Builder of any of its obligations under this Agreement, whether of the same or similar type. The foregoing shall be true whether City’s actions are intentional or unintentional. Builder agrees to waive, as a defense, counterclaim or set off, any and all defects, irregularities or deficiencies in the authorization, execution or performance of the Public Improvements or this Agreement, as well as the laws, rules, regulations, ordinances or resolutions of City with regards to the authorization, execution or performance of the Public Improvements or this Agreement.

20.7Assignment or Transfer of Agreement. Builder shall not assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without prior written consent of City. Any attempt to do so shall be null and void, and any assignee, hypothecatee, or transferee shall acquire no right or interest by reason of such attempted assignment, hypothecation, or transfer. Unless specifically stated to the contrary in

Page 22 of 59 ends

7.G

Page 176 of 459 ends

RIV #4830-8901-9593 v1
- 14 -
City’s written consent, any assignment, hypothecation, or transfer shall not release or discharge Builder from any duty or responsibility under this Agreement.

20.8Binding Effect. Each and all of the covenants and conditions shall be binding on and shall inure to the benefit of the Parties, and their successors, heirs, personal representatives, or assigns. This section shall not be construed as an authorization for any Party to assign any right or obligation.

20.9No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

20.10Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

20.11Consent to Jurisdiction and Venue. This Agreement shall be construed in accordance with and governed by the laws of the State of California. Any legal action or proceeding brought to interpret or enforce this Agreement, or which in any way arises out of the Parties’ activities undertaken pursuant to this Agreement, shall be filed and prosecuted in the appropriate California State Court in the County of Riverside, California. Each Party waives the benefit of any provision of state or federal law providing for a change of venue to any other court or jurisdiction including, without limitation, a change of venue based on the fact that a governmental entity is a party to the action or proceeding, or that a federal right or question is involved or alleged to be involved in the action or proceeding. Without limiting the generality of the foregoing waiver, Builder expressly waives any right to have venue transferred pursuant to California Code of Civil Procedure Section 394.

20.12Attorneys’ Fees and Costs. If any arbitration, lawsuit, or other legal action or proceeding is brought by one Party against the other Party in connection with this Agreement or the Property, the prevailing party, whether by final judgment or arbitration award, shall be entitled to and recover from the other party all Litigation Expenses. Any judgment, order, or award entered in such legal action or proceeding shall contain a specific provision providing for the recovery of Litigation Expenses.

20.13Relationship Between The Parties. The Parties hereby mutually agree that neither this Agreement, any map related to Tract Map No. 33824, nor any other related entitlement, permit, or approval issued by City for the Property shall operate to create the relationship of partnership, joint venture, or agency between City and Builder. Builder’s contractors and subcontractors are exclusively and solely under the control and dominion of Builder. Nothing herein shall be deemed to make Builder or its contractors an agent or contractor of City.

20.14Counterparts. This Agreement may be executed in counterpart originals, which taken together, shall constitute one and the same instrument.

20.15Effective Date of Agreement. This Agreement shall not become effective until the date it has been formally approved by the City and executed by the appropriate authorities of City and Builder.

Page 23 of 59 ends

7.G

Page 177 of 459 ends

RIV #4830-8901-9593 v1
- 15 -
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written.

CITY OF HEMET
By:___________________________
City Manager
ATTEST:
___________________________
City Clerk

APPROVED AS TO FORM
By:_______________________________
City Attorney

Page 24 of 59 ends

7.G

Page 178 of 459 ends

RIV #4830-8901-9593 v1
- 16 -
D.R. HORTON LOS ANGELES HOLDING, INC., A CALIFORNIA CORPORATION By: By:
_________________________________
Its: ______________________________ Its: ___________________________ NOTE: BUILDER’S SIGNATURES SHALL BE DULY NOTARIZED, AND

APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE

REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR
OTHER RULES OR REGULATIONS APPLICABLE TO BUILDER’S
BUSINESS ENTITY.

Page 25 of 59 ends

7.G

Page 179 of 459 ends

RIV #4830-8901-9593 v1

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On __________, ____ before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature: ______________________________________

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER
_______________________________

TITLE(S)

PARTNER(S) LIMITED

GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S)

GUARDIAN/CONSERVATOR
OTHER_______________________________
______________________________________
SIGNER IS REPRESENTING:
(NAME OF PERSON(S) OR ENTITY(IES))
_____________________________________________
_____________________________________________
___________________________________

TITLE OR TYPE OF DOCUMENT
___________________________________

NUMBER OF PAGES
___________________________________

DATE OF DOCUMENT
___________________________________

SIGNER(S) OTHER THAN NAMED ABOVE

Page 26 of 59 ends

7.G

Page 180 of 459 ends

RIV #4830-8901-9593 v1

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On __________, ____ before me, ________________, personally appeared ________________, personally known to me - OR - proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

WITNESS my hand and official seal.
__________________________________________
(SIGNATURE OF NOTARY)

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER
_______________________________

TITLE(S)

PARTNER(S) LIMITED

GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S)

GUARDIAN/CONSERVATOR
OTHER_______________________________
______________________________________
SIGNER IS REPRESENTING:
(NAME OF PERSON(S) OR ENTITY(IES))
_____________________________________________
_____________________________________________
___________________________________

TITLE OR TYPE OF DOCUMENT
___________________________________

NUMBER OF PAGES
___________________________________

DATE OF DOCUMENT
___________________________________

SIGNER(S) OTHER THAN NAMED ABOVE

Page 27 of 59 ends

7.G

Page 181 of 459 ends

RIV #4830-8901-9593 v1
1 SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT “A”

LEGAL DESCRIPTION OF PROPERTY
TRACT NO. 33824

Page 28 of 59 ends

7.G

Page 182 of 459 ends

RIV #4830-8901-9593 v1 1 SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT “B”

LIST OF PUBLIC IMPROVEMENTS
TRACT NO. 33824
Street Improvements (EA0512-011)
Street Improvements (Revised), Storm Drain Improvements, Street Lights (EA1411-001) Sewer & Water Improvements (EA1703-001)

Page 29 of 59 ends

7.G

Page 183 of 459 ends

RIV #4830-8901-9593 v1
1 SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT “C”

SURETY BONDS AND OTHER SECURITY
TRACT NO. 33824
As evidence of understanding the provisions contained in this Agreement, and of the Builder’s intent to comply with same, the Builder has submitted the below described security in the amounts required by this Agreement, and has affixed the appropriate signatures thereto:

PERFORMANCE BOND PRINCIPAL AMOUNT: $ 246,000
Surety:

Attorney-in-fact:

Address:

MATERIAL AND LABOR BOND PRINCIPAL AMOUNT: $ 246,000
Surety:

Attorney-in-fact:

Address:

CASH MONUMENT SECURITY: $ 19,250
Amount deposited per Cash Receipt No. Date:

Page 30 of 59 ends

7.G

Page 184 of 459 ends

RIV #4830-8901-9593 v1
1 SUBDIVISION IMPROVEMENT AGREEMENT
BOND NO. ___________________
INITIAL PREMIUM: ___________________

SUBJECT TO RENEWAL

CITY OF HEMET
TRACT MAP NO. 33824 IMPROVEMENTS

FORM OF PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS the City of Hemet, California (“City”) and D.R. Horton Los Angeles Holding Company, Inc., a California corporation (“Principal”), have executed an agreement for work consisting of, but not limited to, the furnishing all labor, materials, tools, equipment, services, and incidentals for all grading, roads, paving, curbs and gutters, pathways, storm drains, water system, sanitary sewers, utilities, drainage facilities, traffic controls, landscaping, street lights, and all other required facilities for Tract Map No. 33824 (“Public Improvements”); WHEREAS, the Public Improvements to be performed by Principal are more particularly set forth in that certain Subdivision Improvement Agreement dated January 24, 2023 (“Improvement Agreement”);
WHEREAS, the Improvement Agreement is hereby referred to and incorporated herein by reference; and
WHEREAS, Principal is required by the Improvement Agreement to provide a good and sufficient bond for performance of the Improvement Agreement, and to guarantee and warranty the Public Improvements constructed thereunder.

NOW, THEREFORE, Principal and _________________________________ (“Surety”), a corporation organized and existing under the laws of the State of __________, and duly authorized to transact surety business under the laws of the State of California, are held and firmly bound unto City in the sum of Two Hundred Forty-Six Thousand Dollars, ($246,000), said sum being not less than one hundred percent (100%) of the total cost of the Public Improvements as set forth in the Improvement Agreement, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such, that if Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, agreements, guarantees, and warranties in the Improvement Agreement and any alteration thereof made as therein provided, to be kept and performed at the time and in the manner therein specified and in all respects according to their intent and meaning, and to indemnify and save harmless City, its officers, employees, and agents, as stipulated in the Improvement Agreement, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

Page 31 of 59 ends

7.G

Page 185 of 459 ends

RIV #4830-8901-9593 v1
2 SUBDIVISION IMPROVEMENT AGREEMENT
As part of the obligation secured hereby, and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Improvement Agreement, or to any plans, profiles, and specifications related thereto, or to the Public Improvements to be constructed thereunder, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition.

This bond is executed and filed to comply with Section 66499 et seq. of the Government Code of California as security for performance of the Improvement Agreement and security for the one-year guarantee and warranty of the Public Improvements.

IN WITNESS WHEREOF, the seal and signature of the Principal is hereto affixed, and the corporate seal and the name of the Surety is hereto affixed and attested by its duly authorized Attorney-in-Fact at _______________________, this _____ day of _______________, ______.

Principal Surety
By: By:

Its: Managing Member Attorney-In-Fact
(print name) (print name)
NOTE: APPROPRIATE NOTARIAL ACKNOWLEDGMENTS OF EXECUTION

BY PRINCIPAL AND SURETY, AND A COPY OF THE POWER OF

ATTORNEY TO LOCAL REPRESENTATIVES OF THE BONDING
COMPANY MUST BE ATTACHED TO THIS BOND.

Page 32 of 59 ends

7.G

Page 186 of 459 ends

RIV #4830-8901-9593 v1 1 SUBDIVISION IMPROVEMENT AGREEMENT BOND NO. ___________________
INITIAL PREMIUM: ___________________

SUBJECT TO RENEWAL

CITY OF HEMET
TRACT MAP 33824 IMPROVEMENTS

FORM OF LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS the City of Hemet California (“City”) and D.R. Horton Los Angeles Holding Company, Inc., a California corporation (“Principal”), have executed an agreement for work consisting of, but not limited to, the furnishing all labor, materials, tools, equipment, services, and incidentals for all grading, roads, paving, curbs and gutters, pathways, storm drains, sanitary sewers, utilities, drainage facilities, traffic controls, landscaping, street lights, and all other required facilities for Tract Map No. 33824 (“Public Improvements”); WHEREAS, the Public Improvements to be performed by Principal are more particularly set forth in that certain Subdivision Improvement Agreement dated January 24, 2023 (“Improvement Agreement”);
WHEREAS, the Improvement Agreement is hereby referred to and incorporated herein by reference; and
WHEREAS, Principal is required to furnish a bond in connection with the Improvement Agreement providing that if Principal or any of its subcontractors shall fail to pay for any materials, provisions, or other supplies, or terms used in, upon, for, or about the performance of the Public Improvements, or for any work or labor done thereon of any kind, or for amounts due under the provisions of Title 15 (commencing with section 3082) of Part 4 of Division 3 of the California Civil Code, with respect to such work or labor, that the Surety on this bond will pay the same together with a reasonable attorney’s fee in case suit is brought on the bond.

NOW, THEREFORE, Principal and _________________________ (“Surety”), a corporation organized and existing under the laws of the State of _________________, and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto City and to any and all material men, persons, companies or corporations furnishing materials, provisions, and other supplies used in, upon, for or about the performance of the Public Improvements, and all persons, companies or corporations renting or hiring teams, or implements or machinery, for or contributing to the Public Improvements to be done, and all persons performing work or labor upon the same and all persons supplying both work and materials as aforesaid excepting the Principal, the sum of Two Hundred Forty-Six Thousand Dollars, ($246,000), said sum being not less than 100% of the total cost of the Public Improvements under the terms of the Improvement Agreement, we bind ourselves, our heirs, executors and administrators, successors and assigns jointly and severally, firmly by these presents.

Page 33 of 59 ends

7.G

Page 187 of 459 ends

RIV #4830-8901-9593 v1 2 SUBDIVISION IMPROVEMENT AGREEMENT THE CONDITION OF THIS OBLIGATION IS SUCH that if the Principal, his or its subcontractors, heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions, or other supplies or machinery used in, upon, for or about the performance of the Public Improvements, or for work or labor thereon of any kind, or fail to pay any of the persons named in California Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and his subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, and all other applicable laws of the State of California and rules and regulations of its agencies, then said Surety will pay the same in or to an amount not exceeding the sum specified herein.

As part of the obligation secured hereby, and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

This bond is executed and filed to comply with Section 66499 et seq. of the California Government Code as security for payment to contractors, subcontractors, and persons furnishing labor, materials, or equipment for construction of the Public Improvements or performance of the Improvement Agreement. It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the California Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Improvement Agreement, or to any plans, profiles, and specifications related thereto, or to the Public Improvements to be constructed thereunder, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition.

IN WITNESS WHEREOF, the seal and signature of the Principal is hereto affixed, and the corporate seal and the name of the Surety is hereto affixed and attested by its duly authorized Attorney-in-Fact at _____________________, this _____ day of _______________, ______.

Principal Surety
By: By:

Its: Managing Member Attorney-In-Fact
(print name) (print name)

Page 34 of 59 ends

7.G

Page 188 of 459 ends

RIV #4830-8901-9593 v1 3 SUBDIVISION IMPROVEMENT AGREEMENT NOTE: APPROPRIATE NOTARIAL ACKNOWLEDGMENTS OF EXECUTION

BY PRINCIPAL AND SURETY, AND A COPY OF THE POWER OF

ATTORNEY TO LOCAL REPRESENTATIVES OF THE BONDING
COMPANY MUST BE ATTACHED TO THIS BOND.

Page 35 of 59 ends

7.G

Page 189 of 459 ends
Page 36 of 59 ends

7.G

Page 190 of 459 ends
Page 37 of 59 ends

7.G

Page 191 of 459 ends
Page 38 of 59 ends

7.G

Page 192 of 459 ends
Page 39 of 59 ends

7.G

Page 193 of 459 ends
Page 40 of 59 ends

7.G

Page 194 of 459 ends

RECORDEDATTHEREQUESTOFANDWHENRECORDEDRETURNTO:(DocumentexemptfromrecordingfeespursuanttoCal.Gov.Code§27383)CITYOFHEMETAttn:CityManager445EastFloridaAvenueHemet,California92543 2016-043638910/05/201601:05PMFee:$0.00Page1of19RecordedinOfficialRecordsCountyofRiversidePeterQldananssessor—CcuntyC1erk—RecorderIllli“-.[l"‘.”t‘liJln1:i1'i'-lit-*'&E.Til'L’aIl1"!||||lEl——!.‘—————Z— SUBDIVISIONIMPROVEMENTAGREEMENTFINALTRACTMAP33824
ByandBetween
THECITYOFHEMET,amunicipalcorporation
and
McSweenyRecoveryAcquisition,LLC,aDelawarelimited‘liabilitycompany RIV#4836—39l7-8284V2
Dated:Q4/Q
“J-KIIIIV

Page 41 of 59 ends

7.G

Page 195 of 459 ends

DOC#2016-0436389Page2of19
SUBDIVISIONIMPROVEMENTAGREEMENTFINALTRACTMAP33824
ThisSubdivisionImprovementAgreement(“Agreement”)isenteredintoasofthis'5\dayofQ%..t§k2016byandbetweentheCityofHemet,amunicipalcorporation(“City”)andMcSweenyRecoveryAcquisition,LLC,aDelawarelimitedliabilitycompany.CityandDeveloperaresometimeshereinafterindividuallyreferredtoas“Party”andhereinaftercollectivelyreferredtoasthe“Parties.”RECITALSA.DeveloperhassubmittedtoCityanapplicationforapprovalofa?naltractmapforrealpropertylocatedwithinCity,alegaldescriptionofwhichisattachedheretoasExhibit“A”.Thetractmapisidenti?edinCityrecordsasTractMapNo.33824.On,20_,theCityconditionallyapprovedTractNo.33824.B.DeveloperhasnotcompletedalloftheworkormadeallofthePublicImprovementsrequiredbytheSubdivisionMapAct(GovernmentCodesections66410e_t§gq_.),(“MapAct”)theCityOrdinances,theconditionsofapprovalforTractNo.33824,orotherordinances,resolutions,orpoliciesofCityrequiringconstructionofimprovementsinconjunctionwiththesubdivisionofland.C.PursuanttoCityOrdinancesandtheapplicableprovisionsoftheMapAct,DeveloperandCityenterintothisAgreementforthetimelyconstructionandcompletionofthePublicImprovementsandthefurnishingofthesecuritytherefor,acceptabletotheCityEngineerandCityAttorney,forTractNo.33824. _ D.CityhasauthoritytoenterintothisSubdivisionImprovementAgreementpursuanttoGovernmentCodeSections66499— 66499.10.E.PursuanttoGovernmentCodeSection66499,Developer’sexecutionofthisAgreementandtheprovisionofthesecurityaremadeinconsiderationofCity’sapprovalofthe?nalmapforTractNo.33824.DEFINEDTERMS“Developer”shallmeanMcSweenyRecoveryAcquisition,LLC.Theterm“Developer”shallalsoincludeallassignees,totheextentpermittedunderthisAgreement,oftherightsandobligationsofDeveloperunderthisAgreement,andanysuccessor-in-interesttoDeveloperhavingalegaland/orequitableinterestintheProperty.“EstimatedCosts”shallmeantheCityEngineer’sapproximationoftheactualcosttoconstructthePublicImprovements,includingthereplacementcostforalllandscaping.

RIV#4836-3917-8284v2 _]_-

Page 42 of 59 ends

7.G

Page 196 of 459 ends

DOC#2016-0436389Page3of19
“LitigationExpenses”shallmeanallcostsandexpenses,totheextentreasonableinamount,actuallyandnecessarilyincurredbyapartyingoodfaithintheprosecutionofanactionorproceeding,including,butnotlimitedto,courtcosts,?ling,recording,andservicefees,copyingcosts,exhibitproductioncosts,specialmediarentalcosts,attorneys’fees,feesforinvestigators,witnessfees(bothlayandexpert),travelexpenses,depositionandtranscriptcostsandanyothercostorexpense,theawardofwhichacourtofcompetentjurisdictionmaydeterminetobejustandreasonable.

I
“MapAct”shallmeantheSubdivisionMapAct,GovernmentCodeSections66410etseq.“Property”shallmeanthealloftherealpropertycontainedwithintheboundariesofTractMapNo.33824locatedintheCityofHemet,California,asismoreparticularlydescribedinthelegaldescriptionandtractdiagramattachedheretoandincorporatedherebybyreferenceatAttachment“A”.“PublicImprovements”shallinclude,butnotbelimitedto,allgrading,roads,streets,paving,curbsandgutters,sidewalks,paseos,pathways,trails,sanitarysewers,utilities,stormdrains,detentionandretentionbasinsandotherdrainagefacilities,traf?ccontrols,landscaping,streetlightsandallotherfacilitiesrequiredtobeconstructedanddedicatedtotheCityorotherpublicentityasconditionsofapprovalofTentativeTractMapNo.33824andasshownindetailontheplans,andspeci?cationswhichhavebeenapprovedbytheCityandincorporatedintoTractMapNo.33824.ThePartiesagreethatthePublicImprovementstobecompletedbyDeveloperaremorespeci?callydescribedinthediagramorplanattachedheretoandincorporatedhereinbyreferenceasAttachment“B.Notwithstanding,Attachment“B”,DevelopershallremainobligatedtoconstructandcompleteallofthePublicImprovementsrequiredasconditionsofapprovalforTentativeTractMap33824.“RequiredInsurance”shallmeantheinsurancerequiredtobemaintainedbyDeveloperunderSection17.“Security”shallmeansuretybondsintheamountsandunderthetermsofSection12orothersecurityapprovedbyCityEngineerorCityAttorney.“TractNo33824’’shallmeanthe?nalmappreparedand,approvedbytheCityforTentativeTractMapNo.33824.“Warranty”shallmeantheoneyearperiodfollowingcompletionofthePublicImprovementsbyDeveloperandtheacceptanceofthePublicImprovementsbytheCityinwhichDeveloperwarrantsandguaranteesallPublicImprovements.OPERATIVEPROVISIONSNOW,THEREFORE,inconsiderationofthemutualpromisesandcovenantsmadebythepartiesandcontainedhereandotherconsideration,thevalueandadequacyofwhichareherebyacknowledged,thepartiesagreeasfollows:1.EFFECTIVENESS.ThisAgreementshallnotbeeffectiveunlessanduntilallfour(4)ofthefollowingconditionsaresatis?edintheorderprovided:

RIV#4836-3917-8284v2 _2-

Page 43 of 59 ends

7.G

Page 197 of 459 ends

DOC#2016-0436389Page4of19
V

1.1Securig.DeveloperprovidesCitywiththeSecurityofthetypeandintheamountsrequiredbythisAgreement;1.2FinalMapandAgreementApproval.TheCityCounciloftheCity(“CityCouncil”)approvesthe?nalmapforTractNo.33824andthisAgreement;1.3RecordAgreement.DeveloperandCityexecutetheAgreementandCityrecordsthisAgreementintheRecorder’sOf?ceoftheCountyofRiverside;and1.4RecordFinalMap.Developerrecordsthe?nalmapforTractNo.33824intheRecorder’sOf?ceoftheCountyofRiverside.Iftheabovedescribedconditionsarenotsatis?edintheorder,mannerandwithinthetimeprovidedunderthisAgreement,thisAgreementshallautomaticallyterminatewithoutneedoffurtheractionbyeitherCityorDeveloper.2.PUBLICIMPROVEMENTS.Developershallconstructorhaveconstructedatitsowncost,expense,andliabilitythePublicImprovements,asde?nedherein,withinthetimeandinthemannerrequiredunderthisAgreement.ConstructionofthePublicImprovementsshallincludeanytransitionsand/orotherincidentalworkdeemednecessaryfordrainageorpublicsafety.TheDevelopershallberesponsibleforthereplacement,relocation,orremovalofanycomponentofanyirrigationwaterorsewersystemincon?ictwiththeconstructionorinstallationofthePublicImprovements.Suchreplacement,relocation,orremovalshallbeperformedtothecompletesatisfactionoftheCityEngineerandtheownerofsuchwaterorsewersystem.Developerfurtherpromisesandagreestoprovideallequipment,tools,materials,labor,tests,designwork,andengineeringservicesnecessaryorrequiredbyCitytofullyandadequatelycompletethePublicImprovements.2.1PriorPartialConstructionofPublicImprovements.WhereconstructionofanyPublicImprovementshasbeenpartiallycompletedpriortothisAgreement,DeveloperagreestocompletesuchPublicImprovementsorassuretheircompletioninaccordancewiththisAgreement. '

2.2Permits;Notices;UtilityStatements.Priortocommencinganywork,Developershall,atitssolecost,expense,andliability,obtainallnecessarypermitsandapprovalsandgiveallnecessaryandincidentalnoticesrequiredforthelawfulconstructionofthePublicImprovementsandperformanceofDeve1oper’sobligationsunderthisAgreement.Developershallconducttheworkinfullcompliancewiththeregulations,rules,andotherrequirementscontainedinanypermitorapprovalissuedtoDeveloper.Priortocommencinganywork,Developershall?leawrittenstatementwiththeCityClerkandtheCityEngineer,signedbyDeveloperandeachutilitywhichwillprovideutilityservicetotheProperty,attestingthatDeveloperhasmadealldepositslegallyrequiredbytheutilityfortheextensionandprovisionofutilityservicetotheProperty.2.3Pre-approvalofPlansandSpeci?cations.DeveloperisprohibitedfromcommencingworkonanyPublicImprovementuntilallplansandspeci?cationsforsuchPublicImprovementhavebeensubmittedtoandapprovedbytheCityEngineer,orhisorherdesignee.ApprovalbytheCityEngineershallnotrelieveDeveloperfromensuringthatallPublicImprovementsconformwithallotherrequirementsandstandardssetforthinthisAgreement.RIV#4836-3917-8284v2 _3_

Page 44 of 59 ends

7.G

Page 198 of 459 ends

DOC#2016-0436389Page5of19

2.4QualigofWork;ComplianceWithLawsandCodes.Theconstructionplansandspeci?cationsforthePublicImprovementsshallbepreparedinaccordancewithallapplicablefederal,stateandlocallaws,ordinances,regulations,codes,standards,andotherrequirements.ThePublicImprovementsshallbecompletedinaccordancewithallapprovedmaps,plans,speci?cations,standarddrawings,andspecialamendmentstheretoon?lewithCity,aswellasallapplicablefederal,state,andlocallaws,ordinances,regulations,codes,standards,andotherrequirementsapplicableatthetimeworkisactuallycommenced.2.5StandardofPerformance.Developeranditscontractors,ifany,shallperformallworkrequiredtoconstructthePublicImprovementsunderthisAgreementinaskillfulandworkmanlikemanner,andconsistentwiththestandardsgenerallyrecognizedasbeingemployedbyprofessionalsinthesamedisciplineintheStateofCalifornia.Developerrepresentsandmaintainsthatitoritscontractorsshallbeskilledintheprofessionalcallingnecessarytoperformthework.Developerwarrantsthatallofitsemployeesandcontractorsshallhavesuf?cientskillandexperiencetoperformtheworkassignedtothem,andthattheyshallhavealllicenses,permits,quali?cationsandapprovalsofwhatevernaturethatarelegallyrequiredtoperformthework,andthatsuchlicenses,permits,quali?cationsandapprovalsshallbemaintainedthroughoutthetermofthisAgreement.2.6AlterationstoImprovements.Allworkshallbedoneandimprovementsmadeandcompletedasshownonapprovedplansandspeci?cations,andanysubsequentalterationsthereto.IfduringthecourseofconstructionandinstallationofthePublicImprovementsitisdeterminedthatthepublicinterestrequiresalterationsinthePublicImprovements,DevelopershallundertakesuchdesignandconstructionchangesasmaybereasonablyrequiredbyCity.Anyandallalterationsintheplansandspeci?cationsandthePublicImprovementstobecompletedmaybeaccomplishedwithoutgivingpriornoticethereoftoDeveloper’ssuretyforthisAgreement.2.7OtherObligationsReferencedinConditionsofTentativeMapApproval.Inadditiontotheforegoing,DevelopershallsatisfyalloftheconditionsofapprovalonthetentativemapfortheProperty.Theconditionsofapprovalwhichhavenotbeensatis?edpriortothedateofthisAgreementareidenti?edonExhibit“D”hereto.3.MAINTENANCEOFPUBLICIMPROVEMENTSANDLANDSCAPING.CityshallnotberesponsibleorliableforthemaintenanceorcareofthePublicImprovementsuntilCityformallyapprovesandacceptstheminaccordancewithitspoliciesandprocedures.CityshallexercisenocontroloverthePublicImprovementsuntilapprovedandaccepted.AnyusebyanypersonofthePublicImprovements,oranyportionthereo?shallbeatthesoleandexclusiveriskoftheDeveloperatalltimespriortoCity’sacceptanceofthePublicImprovements.DevelopershallmaintainallthePublicImprovementsinastateofgoodrepairuntiltheyarecompletedbyDeveloperandapprovedandacceptedbyCity,anduntilthesecurityfortheperformanceofthisAgreementisreleased.Maintenanceshallinclude,butshallnotbelimitedto,repairofpavement,curbs,gutters,sidewalks,signals,parkways,watermains,andsewers;maintainingalllandscapinginavigorousandthrivingconditionreasonablyacceptabletoCity;removalofdebris?omsewersandstormdrains;andsweeping,repairing,andmaintainingingoodandsafeconditionallstreetsandstreetimprovements.ItshallbeDeveloper’sresponsibilitytoinitiateallmaintenancework,butifitshallfailtodoso,itshallpromptlyperformsuchmaintenanceworkwhennoti?edtodosobyCity.IfDeveloperfailstoproperly RIV#4836-3917-8284V2 _4_

Page 45 of 59 ends

7.G

Page 199 of 459 ends

DOC#2016-0436389Page6of19
prosecuteitsmaintenanceobligationunderthissection,CitymaydoallworknecessaryforsuchmaintenanceandthecostthereofshallbetheresponsibilityofDeveloperanditssuretyunderthisAgreement.CityshallnotberesponsibleorliableforanydamagesorinjuryofanynatureinanywayrelatedtoorcausedbythePublicImprovementsortheirconditionpriortoacceptance.4.CONSTRUCTIONSCHEDULE.UnlessextendedpursuanttothisSection4.1ofthisAgreement,DevelopershallfullyandadequatelycompleteorhavecompletedthePublicImprovementswithinoneyear(12months)followingapprovalofthe?nalmapforTractNo.33824.4.1Extensions.Citymay,initssoleandabsolutediscretion,provideDeveloperwithadditionaltimewithinwhichtocompletethePublicImprovements.ItisunderstoodthatbyprovidingtheSecurityrequiredunderSection12.0e_ts_e(1.ofthisAgreement,DeveloperanditssuretyconsentinadvancetoanyextensionoftimeasmaybegivenbyCitytoDeveloper,andwaivesanyandallrighttonoticeofsuchextension(s).Developer’sacceptanceofanextensionoftimegrantedbyCityshallconstituteawaiverbyDeveloperanditssuretyofalldefenseoflaches,estoppel,statutesoflimitations,andotherlimitationsofactioninanyactionorproceeding?ledbyCityfollowingthedateonwhichthePublicImprovementsweretohavebeencompletedhereunder.Inaddition,asconsiderationforgrantingsuchextensiontoDeveloper,CityreservestherighttoreviewtheprovisionsofthisAgreement,including,butnotlimitedto,theconstructionstandards,thecostestimatesestablishedbyCity,andthesuf?ciencyoftheimprovementsecurityprovidedbyDeveloper,andtorequireadjustmentstheretowhenwarrantedaccordingtoCity’sreasonablediscretion.4.2AccrualofLimitationsPeriod.AnylimitationsperiodprovidedbylawrelatedtobreachofthisAgreementorthetermsthereofshallnotaccrueuntilDeveloperhasprovidedtheCityEngineerwithwrittennoticeofDeveloper’sintenttoabandonorotherwisenotcompleterequiredoragreeduponPublicImprovements.5.GRADING.DeveloperagreesthatanyandallgradingdoneortobedoneinconjunctionwithconstructionofthePublicImprovementsordevelopmentofTractNo.33824shallconformtoallfederal,state,andlocallaws,ordinances,regulations,andotherrequirements,includingCity’sgradingregulations.Allgrading,landscaping,andconstructionactivitiesshallbeperformedinamannertocontrolerosionandprevent?oodingproblems.TheCityEngineershallhavetheauthoritytorequireerosionplanstoprescribereasonablecontrolsonthemethod,manner,andtimeofgrading,landscaping,andconstructionactivitiestopreventnuisancestosurroundingproperties.Plansshallincludewithoutlimitationtemporarydrainageanderosioncontrolrequirements,dustcontrolprocedures,restrictionsontruckandotherconstructiontraf?croutes,noiseabatementprocedures,storageofmaterialsandequipment,removalofgarbage,trash,andrefuse,securingthejobsitetopreventinjury,andsimilarmatters.InordertopreventdamagetothePublicImprovementsbyimproperdrainageorotherhazards,thegradingshallbecompletedinaccordancewiththetimescheduleforcompletionofthePublicImprovementsestablishedbythisAgreement,andpriortoCity’sapprovalandacceptanceofthePublicImprovementsandreleaseoftheSecurityassetforthinSection12.0gs_ec1.ofthisAgreement.6.UTILITIES.Developershallprovideutilityservices,includingwater,sewer,power,gas,andtelephoneservicetoserveeachparcel,lot,orunitoflandwithinTractNo.

RIV#4836-3917-8284v2 _5_

Page 46 of 59 ends

7.G

Page 200 of 459 ends

DOC#2016-0436389Page7of19
33824inaccordancewithallapplicablefederal,state,andlocallaws,rules,andregulations,including,butnotlimitedto,theregulations,schedulesandfeesoftheutilitiesoragenciesprovidingsuchservices.Exceptforcommercialorindustrialproperties,Developershallalsoprovidecabletelevisionfacilitiestoserveeachparcel,lot,orunitoflandinaccordancewithallapplicablefederal,state,andlocallaws,rules,andregulations,including,butnotlimitedto,therequirementsofthecablecompanypossessingavalidfranchisewithCitytoprovidesuchservicewithinCity’sjurisdictionallimits.Allutilitiesshallbeinstalledunderground.7.FEESANDCHARGES.Developershall,atitssolecost,expense,andliability,payallfees,charges,andtaxesarisingoutofconstructionofthePublicImprovements,including,butnotlimitedto,allplancheck,designreview,engineering,inspection,andotherservicefees,andanyimpactorconnectionfeesestablishedbyCityordinance,resolution,regulation,orpolicy,orasestablishedbyCityrelativetoTractNo.33824,orasrequiredbyothergovernmentalagencieshavingjurisdictionoverTractNo.33824.8.CITYINSPECTIONOFPUBLICIMPROVEMENTS.Developershall,atitssolecost,expense,andliability,andatalltimesduringconstructionofthePublicImprovements,maintainreasonableandsafefacilitiesandprovidesafeaccessforinspectionbyCityofthePublicImprovementsandareaswhereconstructionofthePublicImprovementsisoccurringorwilloccur.IftheCityinspectorrequestsit,theDeveloperatanytimebeforeacceptanceofthePublicImprovementsshallremoveoruncoversuchportionsofthe?nishedworkasmaybe‘directedwhichhavenotpreviouslybeeninspected.Afterexamination,theDevelopershallrestoresaidportionsoftheworktothestandardsrequiredhereunder.InspectionorsupervisionbytheCityshallnotbeconsideredasdirectcontroloftheindividualworkmenonthejobsite.City’sinspectorshallhavetheauthoritytostopanyandallworknotinaccordancewiththerequirementscontainedorreferencedinthisAgreement.TheinspectionoftheworkbyCityshallnotrelieveDeveloperorthecontractorofanyobligationstoful?llthisAgreementashereinprovided,andunsuitablematerialsorworkmayberejectednotwithstandingthatsuchmaterialsorworkmayhavebeenpreviouslyoverlookedoraccepted.9.ADMINISTRATIVECOSTS.IfDeveloperfailstoconstructandinstallalloranypartofthePublicImprovementswithinthetimerequiredbythisAgreement,orifDeveloperfailstocomplywithanyotherobligationcontainedherein,DeveloperanditssuretyshallbejointlyandseverallyliabletoCityforalladministrativeexpenses,fees,andcosts,includingreasonableattomey’sfeesandcosts,incurredinobtainingcompliancewiththisAgreementorinprocessinganylegalactionorforanyotherremediespermittedbylaw.10.ACCEPTANCEOFIMPROVEMENTS;AS—BUILTORRECORDDRAWINGS.TheCityCouncilmay,initssoleandabsolutediscretion,acceptfullycompletedportionsofthePublicImprovementspriortosuchtimeasallofthePublicImprovementsarecomplete,whichshallnotreleaseormodifyDeveloper’sobligationtocompletetheremainderofthePublicImprovementswithinthetimerequiredbythisAgreement.10.1Devel0per’sNoticeofCompletion.UponthetotalorpartialacceptanceofthePublicImprovementsbyCity,Developershall?lewiththeRecorder’sOf?ceoftheCountyofRiversideanoticeofcompletionfortheacceptedPublicImprovementsinaccordancewithCaliforniaCivilCodesection3093,atwhichtimetheacceptedPublicImprovementsshallbecomethesoleandexclusivepropertyofCitywithoutpaymenttherefor. ‘
RIV#4836-3917-8284v2 _6_

Page 47 of 59 ends

7.G

Page 201 of 459 ends

DOC#2016-0436389Page8of19

10.2CityAcceptanceofPublicImprovements.IfTractNo.33824wasapprovedandrecordedasasinglephasemap,CityshallnotacceptanyoneormoreoftheimprovementsuntilallofthePublicImprovementsarecompletedbyDeveloperandapprovedbyCity.IssuancebyCityofoccupancypermitsforanybuildingsorstructureslocatedonthePropertyshallnotbeconstruedinanymannertoconstituteCity’sacceptanceorapprovalofanyPublicImprovements.10.3Developer’sObligationtoProvideAs-BuiltorRecord‘Drawings.Notwithstandingtheforegoing,CitymaynotacceptanyPublicImprovementsunlessanduntilDeveloperprovidesone(1)setof“as-built”orrecorddrawingsorplanstotheCityEngineerforallsuchPublicImprovements.Thedrawingsshallbecertifiedandshallre?ecttheconditionofthePublicImprovementsasconstructed,withallchangesincorporatedtherein.11.W ARRANTYANDGUARANTEE.DeveloperherebywarrantsandguaranteesallPublicImprovementsagainstanydefectiveworkorlabordone,ordefectivematerialsfurnishedintheperformanceofthisAgreement,includingthemaintenanceofalllandscapingwithinthePropertyinavigorousandthrivingconditionreasonablyacceptabletoCity,foraperiodofone(1)yearfollowingcompletionoftheworkandacceptancebyCity.DuringtheWarranty,Developershallrepair,replace,orreconstructanydefectiveorotherwiseunsatisfactoryportionofthePublicImprovements,inaccordancewiththecurrentordinances,resolutions,regulations,codes,standards,orotherrequirementsofCity,andtotheapprovaloftheCityEngineer.Allrepairs,replacements,orreconstructionduringtheWarrantyshallbeatthesolecost,expense,andliabilityofDeveloperanditssurety.AstoanyPublicImprovementswhichhavebeenrepaired,replaced,orreconstructedduringtheWarranty,DeveloperanditssuretyherebyagreetoextendtheWarrantyforanadditionalone(1)yearperiodfollowingCity’sacceptanceoftherepaired,replaced,orreconstructedPublicImprovements.NothinghereinshallrelieveDeveloperfromanyotherliabilityitmayhaveunderfederal,state,orlocallawtorepair,replace,orreconstructanyPublicImprovementfollowingexpirationoftheWarrantyoranyextensionthereof.Developer’swarrantyobligationunderthissectionshallsurvivetheexpirationorterminationofthisAgreement.12.SECURITY;SURETYBONDS.PriortoCity’sapprovalandexecutionofthisAgreement,DevelopershallprovideCitywithsuretybondsintheamountsandunderthetermssetforthbelow.TheamountoftheSecurityshallbebasedontheCityEngineer’sEstimatedCosts.IfCitydeterminesatanytimepriortoDeveloper’scompletionofthePublicImprovementsunderSection4[ConstructionSchedule],initssoleandabsolutediscretion,thattheEstimatedCostshavechanged,DevelopershalladjusttheSecurityintheamountrequestedbyCity.Developer’scompliancewiththisprovision(Section12.0e_ts_eq.)shallinnowaylimitormodifyDeveloper’sindemni?cationobligationprovidedinSection16.0ofthisAgreement.12.1PerformanceBond.ToguaranteethefaithfulperformanceofthePublicImprovementsandalltheprovisionsofthisAgreement,toprotectCityifDeveloperisindefaultassetforthinSection18.0gs_eq.ofthisAgreement,andtosecureDeveloper’sone-yearguaranteeandwarrantyofthePublicImprovements,includingthemaintenanceofalllandscapinginavigorousandthrivingcondition,DevelopershallprovideCityafaithfulperformancebondintheamountofNineHundredandEighty-FourThousandDollars($984,000.00),whichsumshallbenotlessthanonehundredpercent(100%)oftheEstimatedCosts.

VRIV#4836-3917-8284V2 _7_

Page 48 of 59 ends

7.G

Page 202 of 459 ends

DOC#2016-0436389Page9of19

12.2PartialRelease.TheCityCouncilmay,initssoleandabsolutediscretionanduponrecommendationoftheCityEngineer,partiallyreleaseaportionorportionsoftheSecurityprovidedunderthissectionasthePublicImprovementsareacceptedbyCity,providedthatDeveloperisnotindefaultonanyprovisionofthisAgreementorconditionofapprovalforTractNo.33824,andthetotalremainingSecurityisnotlessthantwenty-?vepercent(25%)oftheEstimatedCosts.AllSecurityprovidedunderthissectionshallbereleasedattheendoftheWarrantyperiod,oranyextensionthereofasprovidedinSection11.0ofthisAgreement,providedthatDeveloperisnotindefaultonanyprovisionofthisAgreementorconditionofapprovalforTractNo.33824.12.3Labor&MaterialBond.Tosecurepaymenttothecontractors,subcontractors,laborers,materialmen,andotherpersonsfumishinglabor,materials,or‘equipmentforperfonnanceofthePublicImprovementsandthisAgreement,DevelopershallprovideCityalaborandmaterialsbondintheamountofNineHundredandEighty—FourThousandDollars($984,000.00),whichsumshallnotbelessthanonehundredpercent(100%)oftheEstimatedCosts.TheSecurityprovidedunderthissectionmaybereleasedbywrittenauthorizationoftheCityEngineeraftersix(6)monthsfromthedateCityacceptsthe?nalPublicImprovements.TheamountofsuchSecurityshallbereducedbythetotalofallstopnoticeormechanic’slienclaimsofwhichCityisaware,plusanamountequaltotwentypercent(20%)ofsuchclaimsforreimbursementofCity’santicipatedadministrativeandlegalexpensesarisingoutofsuchclaims.12.4AdditionalReguirements.ThesuretyforanysuretybondsprovidedasSecurityshallhaveacurrentA.M.Best’sratingofnolessthanA:VIII,beabankorinsurancecompanylicensedtotransactsuretybusinessinCalifornia,andshallbesatisfactorytoCity.AspartoftheobligationsecuredbytheSecurityandinadditiontothefaceamountoftheSecurity,theDeveloperoritssuretyshallsecurethecostsandreasonableexpensesandfees,includingreasonableattorney’sfeesandcosts,incurredbyCityinenforcingtheobligationsofthisAgreement.TheDeveloperanditssuretystipulateandagreethatnochange,extensionoftime,alteration,oradditiontothetermsofthisAgreement,thePublicImprovements,ortheplansandspeci?cationsforthePublicImprovementsshallinanywayaffectitsobligationontheSecurity.12.5FormofSecurig.TheevidenceoftheSecurityshallbeprovidedontheformsset_forthinAttachment“C”,unlessotherformsaredeemedacceptablebytheCityEngineerandtheCityAttorney,andwhensuchformsarecompletedtothesatisfactionofCity,theformsandevidenceoftheSecurityshallbeattachedheretoasAttachment“C”andincorporatedhereinbythisreference.12.6Developer’sLiability.WhilenoactionofDevelopershallberequiredinorderforCitytorealizeonitssecurityunderanySecurityinstrument,DeveloperagreestocooperatewithCitytofacilitateCity’srealizationunderanySecurityinstrument,andtotakenoactiontopreventCityfromsuchrealizationunderanySecurityinstrument.NotwithstandingthegivingofanySecurityinstrumentorthesubsequentexpirationofanySecurityinstrumentoranyfailurebyanysuretyor?nancialinstitutiontoperformitsobligationswithrespectthereto,DevelopershallbepersonallyliableforperformanceunderthisAgreementandforpaymentofthecostofthelaborandmaterialsfortheimprovementsrequiredtobeconstructedorinstalledherebyandshall,withinten(10)daysafterwrittendemandtherefor,delivertoCitysuchsubstituteSecurityasCityshallrequiresatisfyingtherequirementsinthisSection12.

RIV#4836-3917-8284V2 _8-

Page 49 of 59 ends

7.G

Page 203 of 459 ends

DOC#2016-0436389Page10of19

13.MONUMENTSECURITY .PriortoCity’sexecutionofthisAgreement,toguaranteepaymenttotheengineerorsurveyorforthesettingofallsubdivisionboundaries,lotcomers,andstreetcenterlinemonumentsforTractNo.33824incompliancewiththeapplicableprovisionsofCity’sMunicipaland/orDevelopmentCode(“SubdivisionMonuments”),DevelopershalldepositcashwithCityintheamountof{FourteenThousandFiveHundredDollars}($14,500),whichsumshallnotbelessthanonehundredpercent(100%)ofthecostsofsettingtheSubdivisionMonumentsasdeterminedbytheCityEngineer.Saidcashdepositmay‘bereleasedbywrittenauthorizationoftheCityEngineerafterallrequiredSubdivisionMonumentsareacceptedbytheCityEngineer,CityhasreceivedwrittenacknowledgmentofpaymentinfullfromtheengineerorsurveyorwhosettheSubdivisionMonuments,andprovidedDeveloperisnotindefaultofanyprovisionofthisAgreementorconditionofapprovalforTractNo.33824.14.LIEN.TosecurethetimelyperformanceofDeveloper’sobligationsunderthisAgreement,includingthoseobligationsforwhichsecurityhasbeenprovidedpursuanttoSections12.0gt$1.and13.0ofthisAgreement,DeveloperherebycreatesinfavorofCityalienagainstallportionsofthePropertynotdedicatedtoCityorsomeothergovernmentalagencyforapublicpurpose.AstoDeveloper’sdefaultonthoseobligationsforwhichsecurityhasbeenprovidedpursuanttoSections12.0e_t$1.and13.0ofthisAgreement,Cityshallfirstattempttocollectagainstsuchsecuritypriortoexercisingitsrightsasacontractlienholderunderthissection.15.SIGNSANDADVERTISING.DeveloperunderstandsandagreestoCity’sordinances,regulations,andrequirementsgoverningsignsandadvertisingstructures.DeveloperherebyagreeswithandconsentstothesummaryremovalbyCity,withoutnoticetoDeveloper,ofallsignsorotheradvertisingstructureserected,placed,orsituatedinviolationofanyCityordinance,regulation,orotherrequirement.RemovalshallbeattheexpenseofDeveloperanditssurety.DeveloperanditssuretyshallindemnifyandholdCity?eeandharmlessfromanyclaimordemandarisingoutoforincidenttosigns,advertisingstructures,ortheirremoval.16.INDEMNIFICATION.Developershalldefend,indemnify,andholdharmlessCity,itselectedofficials,of?cers,employees,andagentsfromanyandallactualorallegedclaims,demands,causesofaction,liability,loss,damage,orinjury,topropertyorpersons,includingwrongfuldeath,whetherimposedbyacourtoflaworbyadministrativeactionofanyfederal,state,orlocalgovernmentalbodyoragency,arisingoutoforincidenttoanyacts,omissions,negligence,orwillfulmisconductofDeveloper,itspersonnel,employees,agents,orcontractorsinconnectionwithorarisingoutofconstructionormaintenanceofthePublicImprovements,orperformanceofthisAgreement.Thisindemni?cationincludes,withoutlimitation,thepaymentofallpenalties,?nes,judgments,awards,decrees,attorneys’fees,andrelatedcostsorexpenses,andthereimbursementofCity,itselectedof?cials,of?cers,employees,and/oragentsforalllegalexpensesandcostsincurredbyeachofthem.Thisindemni?cationexcludesonlysuchportionofanyclaim,demand,causeofaction,liability,loss,damage,penalty,?ne,orinjury,topropertyorpersons,includingwrongfuldeath,whichiscausedsolelyandexclusivelybythegrossnegligenceorwillfulmisconductofCityasdeterminedbyacourtoradministrativebodyofcompetentjurisdiction.Developer’sobligationtoindemnifyCityshallsurvivetheexpirationorterminationofthisAgreement,andshallnotberestrictedtoinsuranceproceeds,ifany,receivedbyCity,itselectedof?cials,of?cers,employees,oragents.

RIV#4836-3917-8284V2
‘
_9-

Page 50 of 59 ends

7.G

Page 204 of 459 ends

DOC#2016-0436389Page11of19

17.INSURANCE.17.1Types;Amounts.Developershallprocureandmaintain,andshallrequireitscontractorstoprocureandmaintain,duringconstructionofanyPublicImprovementpursuanttothisAgreement,insuranceofthetypesandintheamountsdescribedbelow.IfanyoftheRequiredInsurancecontainsageneralaggregatelimit,suchinsuranceshallapplyseparatelytothisAgreementorbenolessthantwotimesthespeci?edoccurrencelimit.17.1.1GeneralLiability.Developeranditscontractorsshallprocureandmaintainoccurrenceversiongeneralliabilityinsurance,orequivalentform,withacombinedsinglelimitofnotlessthan$3,000,000peroccurrenceforbodilyinjury,personalinjury,andpropertydamage.17.1.2BusinessAutomobileLiability.Developeranditscontractorsshallprocureandmaintainbusinessautomobileliabilityinsurance,orequivalentform,withacombinedsinglelimitofnotlessthan$1,000,000peroccurrence.Suchinsuranceshallincludecoveragefortheownership,operation,maintenance,use,loading,orunloadingofanyvehicleowned,leased,hired,orborrowedbytheinsuredorforwhichtheinsuredisresponsible.I 17.1.3Workers’Compensation.Developeranditscontractorsshallprocureandmaintainworkers’compensationinsurancewithlimitsasrequiredbytheLaborCodeoftheStateofCaliforniaandemployers’liabilityinsurancewithlimitsofnotlessthan$1,000,000peroccurrence,atalltimesduringwhichinsuredretainsemployees.17.1.4ProfessionalLiability.ForanyconsultantorotherprofessionalwhowillengineerordesignthePublicImprovements,liabilityinsuranceforerrorsandomissionswithlimitsnotlessthan$1,000,000peroccurrence,shallbeprocuredandmaintainedforaperiodof?ve(5)yearsfollowingcompletionofthePublicImprovements.Suchinsuranceshallbeendorsedtoincludecontractualliability.17.2Deductibles.Anydeductiblesorself-insuredretentionsmustbedeclaredtoandapprovedbyCity.AttheoptionofCity,either:(a)theinsurershallreduceoreliminatesuchdeductiblesorself-insuredretentionsasrespectsCity,itselectedof?cials,of?cers,employees,agents,andvolunteers;or(b)Developeranditscontractorsshallprovidea?nancialguaranteesatisfactorytoCityguaranteeingpaymentoflossesandrelatedinvestigationcosts,claims,andadministrativeanddefenseexpenses.17.3AdditionalInsured;SeparationofInsureds.TheRequiredInsuranceshallnameCity,itselectedof?cials,of?cers,employees,agents,andvolunteersasadditionalinsuredswithrespecttoworkperformedbyoronbehalfofDeveloperoritscontractors,includingmaterials,parts,orequipmentfurnishedinconnectiontherewith.TheRequiredInsuranceshallcontainstandardseparationofinsuredprovisions,andshallcontainnospeciallimitationsonthescopeofitsprotectiontoCity,itselectedof?cials,of?cers,employees,agents,andvolunteers.17.4Prima1_'yInsurance;WaiverofSubrogation.TheRequiredInsuranceshallbeprimarywithrespecttoanyinsuranceorself-insuranceprogramscoveringCity,itselectedof?cials,of?cers,employees,agents,andvolunteers.AllpoliciesfortheRequired RIV#4836—3917-8284v2 _10_

Page 51 of 59 ends

7.G

Page 205 of 459 ends

DOC#2016-0436389Page12of19
InsuranceshallprovidethattheinsurancecompanywaivesallrightofrecoverybywayofsubrogationagainstCityinconnectionwithanydamageorharmcoveredbysuchpolicy.17.5Certi?cates‘Veri?cation.DeveloperanditscontractorsshallfurnishCitywithoriginalcertificatesofinsuranceandendorsementseffectingcoveragefortheRequiredInsurance.Thecerti?catesandendorsementsforeachinsurancepolicyshallbesignedbyapersonauthorizedbythatinsurertobindcoverageonitsbehalf.Allcerti?catesandendorsementsmustbereceivedandapprovedbyCitybeforeworkpursuanttothisAgreementcanbegin.Cityreservestherighttorequirecomplete,certi?edcopiesofallrequiredinsurancepolicies,atanytime.17.6Term°CancellationNotice.DeveloperanditscontractorsshallmaintaintheRequiredInsuranceforthetermofthisAgreementandshallreplaceanycerti?cate,policy,orendorsementwhichwillexpirepriortothatdate.AllpoliciesshallbeendorsedtoprovidethattheRequiredInsuranceshallnotbesuspended,voided,reduced,canceled,orallowedtoexpireexcepton30days’priorwrittennoticetoCity.17.7InsurerRating.UnlessapprovedinwritingbyCity,allRequiredInsuranceshallplacedwithinsurerslicensedtodobusinessintheStateofCaliforniaandwithacurrentA.M.BestratingofatleastA:VIII.18.DEFAULT;NOTICE;REMEDIES.18.1Notice.IfDeveloperneglects,refuses,orfailstoful?llortimelycompleteanyobligation,term,orconditionofthisAgreement,orifCitydeterminesthereisaviolationofanyfederal,state,orlocallaw,ordinance,regulation,code,standard,orotherrequirement,CitymayatanytimethereafterdeclareDevelopertobeindefaultorviolationofthisAgreementandmakewrittendemanduponDeveloperoritssurety,orboth,toimmediatelyremedythedefaultorviolation.Developershallcommencetheworkrequiredtoremedythedefaultorviolationwithinten(10)daysofthewrittendemandfromtheCity.Ifthedefaultorviolationconstitutesanimmediatethreattothepublichealth,safety,orwelfare,Citymayprovidethedemandverbally,andDevelopershallcommencetherequiredworkwithintwenty-four(24)hoursthereof.ImmediatelyuponCity’sissuanceofthedemandtoremedythedefault,DeveloperanditssuretyshallbeliabletoCityforallcostsofconstructionandinstallationofthePublicImprovementsandallotheradministrativecostsexpensesasprovidedforinSection9.0ofthisAgreement.18.2FailuretoRemedy;CigAction.IftheworkrequiredtoremedythenoticeddefaultorviolationisnotdiligentlyprosecutedtoasubstantialcompletionacceptabletoCitywithinareasonabletimedesignatedbytheCity,Citymaycompleteallremainingwork,arrangeforthecompletionofallremainingwork,and/orconductsuchremedialactivityasinitssoleandabsolutediscretionitbelievesisrequiredtoremedythedefaultorviolation.Allsuchworkorremedialactivityshallbeatthesoleandabsolutecost,expense,andliabilityofDeveloperanditssurety,withoutthenecessityofgivinganyfurthernoticetoDeveloperorsurety.City’srighttotakesuchactionsshallinnowaybelimitedbythefactthatDeveloperoritssuretymayhaveconstructedany,ornoneoftherequiredoragreeduponPublicImprovementsatthetimeofCity’sdemandforperformance.IntheeventCityelectstocompleteorarrangeforcompletionoftheremainingworkandimprovements,Citymayrequire RIV#4836-3917-8284v2 -11-

Page 52 of 59 ends

7.G

Page 206 of 459 ends

DOC#2016-0436389Page13of19
allworkbyDeveloperoritssuretytoceaseinordertoallowadequatecoordinationbyCity.Notwithstandingtheforegoing,ifconditionsprecedentforreversiontoacreagecanbemetandiftheinterestsofCitywillnotbeprejudicedthereby,CitymayalsoprocessareversiontoacreageandthereafterrecoverfromDeveloperoritssuretythefill]costandexpenseincurred.18.3OtherRemedies.NoactionbyCitypursuanttoSection18.0e_tsgq.ofthisAgreementshallprohibitCityfromexercisinganyotherrightorpursuinganyotherlegalorequitableremedyavailableunderthisAgreementoranyfederal,state,orlocallaw.Citymayexerciseitrightsandremediesindependentlyorcumulatively,andCitymaypursueinconsistentremedies.Citymayinstituteanactionfordamages,injunctiverelief,orspeci?cperformance.19.GENERALPROVISIONS.19.1AuthoritytoEnterAgreement.EachPartywarrantsthattheindividualswhohavesignedthisAgreementhavethelegalpower,right,andauthoritymakethisAgreementandbindeachrespectiveParty.19.2Cooperation;FurtherActs.ThePartiesshallfullycooperatewithoneanother,andshalltakeanyadditionalactsorsignanyadditionaldocumentsasmaybenecessary,appropriate,orconvenienttoattainthepurposesofthisAgreement.19.3Construction;References;Captions.ItbeingagreedthePartiesortheiragentshaveparticipatedinthepreparationofthisAgreement,thelanguageofthisAgreementshallbeconstruedsimply,accordingtoitsfairmeaning,andnotstrictlyfororagainstanyParty.Anytermreferencingtime,days,orperiodforperformanceshallbedeemedcalendardaysandnotworkdays.AllreferencestoDeveloperincludeallpersonnel,employees,agents,andsubcontractorsofDeveloper,exceptasotherwisespeci?edinthisAgreement.AllreferencestoCityincludeitselectedof?cials,of?cers,employees,agents,andvolunteersexceptasotherwisespeci?edinthisAgreement.Thecaptionsofthevariousarticlesandparagraphsareforconvenienceandeaseofreferenceonly,anddonotde?ne,limit,augment,ordescribethescope,content,orintentofthisAgreement.19.4Notices.Allnotices,demands,invoices,andwrittencommunicationsshallbeinwritinganddeliveredtothefollowingaddressesorsuchotheraddressesasthePartiesmaydesignatebywrittennotice:CITY:CityofHemetAttn:AlexanderP.Meyerhoff,CityManager445E.FloridaAvenueHemet,CA92543 RIV#4836-3917-8284v2 _12_

Page 53 of 59 ends

7.G

Page 207 of 459 ends

DOC#2016-0436389Page14of19
DEVELOPER:McSweenyFarmsRecoveryAcquisition,LLCc/oRaintreeInvestmentCorporationAttn:MatthewVillalobos5796ArmadaDrive,Suite375Carlsbad,CA92008Dependinguponthemethodoftransmittal,noticeshallbedeemedreceivedasfollows:byfacsimile,asofthedateandtimesentprovidedtheoriginaliscontemporaneouslydepositedwithUnitedStatesPostalServiceanddeliveredbyregularmail;bymessenger,asofthedatedelivered;andbyU.S.Mail?rstclasspostageprepaid,asof72hoursafterdepositintheU.S.Mail.19.5Amendment‘Modi?cation.Nosupplement,modi?cation,oramendmentofthisAgreementshallbebindingunlessexecutedinwritingandsignedbybothParties.19.6Waiver.City’sfailuretoinsistuponstrictcompliancewithanyprovisionofthisAgreementortoexerciseanyrightorprivilegeprovidedherein,orCity’swaiverofanybreachofthisAgreement,shallnotrelieveDeveloperofanyofitsobligationsunderthisAgreement,whetherofthesameorsimilartype.TheforegoingshallbetruewhetherCity’sactionsareintentionalorunintentional.Developeragreestowaive,asadefense,counterclaimorsetoff,anyandalldefects,irregularitiesorde?cienciesintheauthorization,executionorperformanceofthePublicImprovementsorthisAgreement,aswellasthelaws,rules,regulations,ordinancesorresolutionsofCitywithregardstotheauthorization,executionorperformanceofthePublicImprovementsorthisAgreement.19.7AssignmentorTransferofAgreement.Developershallnotassign,hypothecate,ortransfer,eitherdirectlyorbyoperationoflaw,thisAgreementoranyinteresthereinwithoutpriorwrittenconsentofCity.Anyattempttodososhallbenullandvoid,andanyassignee,hypothecatee,ortransfereeshallacquirenorightorinterestbyreasonofsuchattemptedassignment,hypothecation,ortransfer.Unlessspeci?callystatedtothecontraryinCity’swrittenconsent,anyassignment,hypothecation,ortransfershallnotreleaseordischargeDeveloperfromanydutyorresponsibilityunderthisAgreement.19.8BindingEffect.Eachandallofthecovenantsandconditionsshallbebindingonandshallinuretothebene?toftheParties,andtheirsuccessors,heirs,personalrepresentatives,orassigns.ThissectionshallnotbeconstruedasanauthorizationforanyPartytoassignanyrightorobligation.19.9NoThirdPartyBeneficiaries.Therearenointendedthirdpartybene?ciariesofanyrightorobligationassumedbytheParties.19.10Invalidig;Severabilig.IfanyportionofthisAgreementisdeclaredinvalid,illegal,orotherwiseunenforceablebyacourtofcompetentjurisdiction,theremainingprovisionsshallcontinueinfullforceandeffect.

RIV#4836-3917-8284v2 _13-

Page 54 of 59 ends

7.G

Page 208 of 459 ends

DOC#2016-0436389Page15of19

19.11ConsenttoJurisdictionandVenue.ThisAgreementshallbeconstruedinaccordancewithandgovernedbythelawsoftheStateofCalifornia.AnylegalactionorproceedingbroughttointerpretorenforcethisAgreement,orwhichinanywayarisesoutoftheParties’activitiesundertakenpursuanttothisAgreement,shallbe?ledandprosecutedintheappropriateCaliforniaStateCourtintheCountyofRiverside,California.EachPartywaivesthebene?tofanyprovisionofstateorfederallawprovidingforachangeofvenuetoanyothercourtorjurisdictionincluding,withoutlimitation,achangeofvenuebasedonthefactthatagovernmentalentityisapartytotheactionorproceeding,orthatafederalrightorquestionisinvolvedorallegedtobeinvolvedintheactionorproceeding.Withoutlimitingthegeneralityoftheforegoingwaiver,DeveloperexpresslywaivesanyrighttohavevenuetransferredpursuanttoCaliforniaCodeofCivilProcedureSection394.19.12Attorneys’FeesandCosts.Ifanyarbitration,lawsuit,orotherlegalactionorproceedingisbroughtbyonePartyagainsttheotherPartyinconnectionwiththisAgreementortheProperty,theprevailingparty,whetherby?naljudgmentorarbitrationaward,shallbeentitledtoandrecoverfromtheotherpartyallLitigationExpenses.Anyjudgment,order,orawardenteredinsuchlegalactionorproceedingshallcontainaspeci?cprovisionprovidingfortherecoveryofLitigationExpenses.19.13RelationshipBetweenTheParties.ThePartiesherebymutuallyagreethatneitherthisAgreement,anymaprelatedtoTractNo.33824,noranyotherrelatedentitlement,permit,orapprovalissuedbyCityforthePropertyshalloperatetocreatetherelationshipofpartnership,jointventure,oragencybetweenCityandDeveloper.Developer’scontractorsandsubcontractorsareexclusivelyandsolelyunderthecontrolanddominionofDeveloper.NothinghereinshallbedeemedtomakeDeveloperoritscontractorsanagentorcontractorofCity.19.14Counterparts.ThisAgreementmaybeexecutedincounterpartoriginals,whichtakentogether,shallconstituteoneandthesameinstrument.19.15EffectiveDateofAgreement.ThisAgreementshallnotbecomeeffectiveuntilthedateithasbeenformallyapprovedbytheCityandexecutedbytheappropriateauthoritiesofCityandDeveloper.INWITNESSWHEREOF,thepartiesheretohaveexecutedthisAgreementonthedateandyear?rst-abovewritten. CITYOFHEMET AlexanderP.MeyoffCityManager
RIV#4836-3917-8284V2 _ _

Page 55 of 59 ends

7.G

Page 209 of 459 ends

DOC#2016-0436389Page16of19
ATTEST:

E/MWWWwSarahMcComasCityClerk

APPROVEDASTOFORM
By:EricS.V11CityAttorney
McSweenyFarmsRecoveryAcquisition,LLC
Its:uthorizedSignatory
NOTE:DEVELOPER’SSIGNATURESSHALLBEDULYNOTARIZED,ANDAPPROPRIATEATTESTATIONSSHALLBEINCLUDEDASMAYBEREQUIREDBYTHEBYLAWS,ARTICLESOFINCORPORATION,OROTHERRULESORREGULATIONSAPPLICABLETODEVELOPERTSBUSINESSENTITY .

MARSHAROJASNotaryPublic,StateofNewYorkNo.01RO6064861QualifiedinSuffolkCountyCommissionExpiresOctober1.2017 RIV#4836-3917-8284v2 _15_

Page 56 of 59 ends

7.G

Page 210 of 459 ends

DOC#2016-0436389Page17of19
EXHIBIT“A”LEGALDESCRIPTIONOFPROPERTYTRACTNO.33824
RIV#4836-3917-8284V2 1 SUBDIVISIONIMPROVEMENTAGREEMENT

Page 57 of 59 ends

7.G

Page 211 of 459 ends

DOC#2016-0436389Page18of19
EXHIBIT“B”LISTOFPUBLICIMPROVEMENTSTRACTNO.33824
RIV#4836-3917-8284V2 1 SUBDIVISIONIIVIPROVEMENTAGREEMENT

Page 58 of 59 ends

7.G

Page 212 of 459 ends

DOC#2016-0436389Page19of19
EXHIBIT“C”SURETYBONDSANDOTHERSECURITYTRACTNO.33824AsevidenceofunderstandingtheprovisionscontainedinthisAgreement,andoftheDeve1oper’sintenttocomplywithsame,theDeveloperhassubmittedthebelowdescribedsecurityintheamountsrequiredbythisAgreement,andhasaffixedtheappropriatesignaturesthereto:PERFORMANCEBONDPRINCIPALAMOUNT:$984,000Surety:Lexon/IronshoreAttorney—in-fact:Address:IronshoreSpecialtyInsuranceCo.P.O.Box3407NewYork,NY ,1008 LABOR&MATERIALBONDPRINCIPALAMOUNT:$984,000Surety:Lexon/IronshoreAttorney-in—fact:.Address:IronshoreSpecialtyInsuranceCo.P.O.Box3407NewYork,NY ,1008 CASHMONUMENTSECURITY:$14,500AmountdepositedperCashReceiptNo. Date:
1 SUBDIVISIONIIVIPROVEMENTAGREEMENTRIV#4836-3917-8284v2

Page 59 of 59 ends

7.G

Page 213 of 459 ends
Page 214 of 459 ends

City of Hemet
City Council Meeting

STAFF REPORT

Meeting: City Council Meeting - Jan 24 2023
Department: Public Works
Submitted by: Eddie Pust, Interim City Manager
Noah Rau, Public Works Director/City Engineer;

☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing

TITLE:

A Resolution of the City Council of the City of Hemet, California, Approving Replacement Subdivision Improvement Agreement, Acceptance of Public Improvements, Reduction of Improvement Security to 25% of the original value for Tract Map No. 33824-1, located in McSweeny Farms, south of McSweeny Parkway and east of South Village Loop (Richmond American Homes, a California Corporation), and release of existing Subdivision Improvement Agreement and Improvement Security provided by McSweeny Recovery Acquisition, LLC

RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Approving Replacement Subdivision Improvement Agreement, Acceptance of Public Improvements, Reduction of Improvement Security to 25% of the original value for Tract Map No. 33824-1, located in McSweeny Farms, south of McSweeny Parkway and east of South Village Loop (Richmond American Homes, a California Corporation), and release of existing Subdivision I mprovement Agreement and Improvement Security provided by McSweeny Recovery Acquisition, LLC.

BACKGROUND:

At a regularly scheduled City Council meeting held on September 28, 2016, the City Council approved Tract Map No. 33824 -1, along with the Subdivisi on Improvement Agreement ("Agreement"), and accepted the Performance Bond and Material and Labor Bond ("Bonds"). The Agreement was executed by McSweeny Recovery Acquisition, LLC, ("Developer"), who also secured the Bonds necessary to ensure the public imp rovements associated with Tract Map No. 33824 -1 would be completed.

The Developer has since sold Tract Map No. 33824 -1 to Richmond American Homes, a California Corporation ("Builder"). All of the public improvements have been completed by both the Devel oper and the Builder to the satisfaction of the City Engineer.

ANALYSIS:

Page 1 of 60 ends

7.H

Page 215 of 459 ends

Tract Map No. 33824 -1 provides for the development of 77 single family residential units and all associated road and utility improvements located in McSweeny Farms Specific Plan Area, south of McSweeny Parkway and east of South Village Loop. Now that the D eveloper and Builder have completed all of the public improvements associated with the approval of Tract Map No. 33824-1 to the satisfaction of the City Engineer, the Developer and Builder are requesting a reduction in the Improvement Security to 25% of th e original values identified in the original Subdivision Improvement Agreement known as Riverside County Recorder’s Document No. 2016 -0436390 (“Existing Agreement”).

Section 12.2 "Partial Release" of the Existing Agreement allows the City Council to part ially release a portion of the Improvement Security as the public improvements are accepted by the City. The Developer and Builder filed a Notice of Completion with the Riverside County Recorder's office to signify the completion of public improvements.

DISCUSSION:

The next step in the process is consideration of the replacement of the agreement for the subdivision work and accepting the new reduced bonds to warranty the work per the requirements of the Existing Agreement.

The City Attorney has revi ewed and approved the Subdivision Improvement Agreements and the Improvement Bond forms. Staff recommends that the City Council accept the replacement subdivision agreement and public improvement bonds and release the agreement and bonds provided by the Developer.

Certified record drawings have been provided for the public improvements as required by Section 10.3 of the Subdivision Improvement Agreement.

PREVIOUS COUNCIL ACTION:

• City Council meeting of September 28, 2016 - City Council approved Tract Map No. 33824-1; subdivision improvement agreement; and accepted offers of dedication and improvement bonds from the developer.

STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

Objective 1: Enhance the visual appearance of the community to make it attractive and reduce blight through construction of new homes.

FISCAL IMPACT:

There are no impacts to the General Fund with this City Council action.

ALTERNATIVE(S):

Page 2 of 60 ends

7.H

Page 216 of 459 ends

1. Do not approve the Resolution to replace the Subdivision Improvement Agreement and Improvement Security

2. Provide alternate direction to staff

REVIEWED BY LEGAL:

☒ Staff report ☒ Resolution
☐ Ordinance ☒ Agreement

ATTACHMENT(S):

Attachment 1 - Reso Approving replacement SIA for Final Tract Map 33824-1-REVISED Attachment 2 - Exhibit A-Subdivision Improvement Agreement - Final Tract Map No. 33824-1- REVISED-01062023
Attachment 3 - Exhibit B - mb452_071_076
Attachment 4- Existing TR 33824-1 Subdivision Improvement Agm-RAINTREE

Page 3 of 60 ends

7.H

Page 217 of 459 ends

RIV #4833-2180-7817 v1 - 1 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

CITY OF HEMET
Hemet, California
RESOLUTION NO. 2023-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

HEMET, CALIFORNIA, APPROVING REPLACEMENT

SUBDIVISION IMPROVMENET AGREEMENT,

ACCEPTING PUBLIC IMPROVEMENTS, REDUCTION OF
IMPROVEMENT SECURITY TO 25% OF THE ORIGINAL
VALUE FOR TRACT MAP NO. 33824-1, LOCATED IN

MCSWEENY FARMS, SOUTH OF MCSWEENY PARKWAY

AND EAST OF SOUTH VILLAGE LOOP (RICHMOND
AMERICAN HOMES., A CALIFORNIA CORPORATION),

AND RELEASE OF EXISTING SUBDIVISION

IMPROVEMENT AGREEMENT AND IMPROVEMENTE

SECURITY PROVIVDED BY MCSWEENY RECOVERY
ACQUISITION, LLC.

WHEREAS, Tract Map 33824-1, submitted for approval by McSweeny Recovery Acquisition, LLC., a Delaware Limited Liability Company (“Developer”), and approved by the City of Hemet on September 28, 2016; and
WHEREAS, Richmond American Homes., a California Corporation (“Builder”) has acquired the land known as Tract Map 33824-1 from Developer (a copy of which is attached as Exhibit “B”); and
WHEREAS, the Developer and Builder have completed all the public improvements to the satisfaction of the City Engineer as required by Subdivision Improvement Agreement known as Riverside County Recorder’s Document No. 2016- 0436390 (“Existing Agreement”) and are requesting a reduction of Improvement Security to 25% of the original value for Tract Map No. 33824-1; and WHEREAS, to meet and continue the requirements established as a prerequisite to final approval of Tract Map No. 33824-1, Builder agreed to enter into a Subdivision Improvement Agreement superseding and replacing Existing Agreement, together with

Page 4 of 60 ends

7.H

Page 218 of 459 ends

RIV #4833-2180-7817 v1 - 2 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
good and sufficient security, in conformance with the City Attorney’s approved format, for approval and execution by the City; and
WHEREAS, upon recordation of the replacement Subdivision Improvement Agreement and Improvement Security by Builder, the previously recorded Existing Agreement shall be released by the Interim City Manager or designee; and WHEREAS, the Subdivision Improvement Agreement and good and sufficient security have been accepted by the City; and

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HEMET AS FOLLOWS:

SECTION 1. RECITALS
The foregoing recitals are true and correct.

SECTION 2. APPROVAL OF REPLACEMENT SUBDIVISION IMPROVEMENT

AGREEMENT
A. The Subdivision Improvement Agreement attached hereto as Exhibit “A” is approved and the Interim City Manager is authorized to execute it and the City Clerk is authorized to attest thereto.

B. Public Improvements associated with Tract Map No. 33824-1 that are complete are now to be accepted by the City
C. Said improvement security shall be reduced to 25% of the original value and is accepted as good and sufficient, subject to approval as to form and content thereof by the City Attorney,
D. Upon recordation of the Replacement Subdivision Improvement Agreement, the Interim City Manager, or his designee, is authorized to release the existing Subdivision Improvement Agreement and Improvement Security.

E. Pursuant to Government Code Section 66458, Tract Map No. 33824-1 was previously approved, and City accepted the real property described therein.

SECTION 3. CERTIFICATION
This Resolution shall take effect immediately upon its adoption by the City Council. The

Page 5 of 60 ends

7.H

Page 219 of 459 ends

RIV #4833-2180-7817 v1 - 3 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City Clerk shall attest to and certify the vote adopting this Resolution.

Page 6 of 60 ends

7.H

Page 220 of 459 ends

RIV #4833-2180-7817 v1 - 4 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
PASSED, APPROVED AND ADOPTED this 24th day of January 2023.

Joe Males, Mayor
ATTEST: APPROVED AS TO FORM:
_____________________________
John Paul Maier, City Clerk Steven Graham, City Attorney

Page 7 of 60 ends

7.H

Page 221 of 459 ends

RIV #4833-2180-7817 v1 - 5 -
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 24th day of January, 2023 and was passed by the following vote:

AYES: Council Members:

NOES: Council Member:

ABSTAIN: Council Member:

ABSENT: Council Member:
_________________________________
John Paul Maier, City Clerk

Page 8 of 60 ends

7.H

Page 222 of 459 ends

RIV #4830-8901-9593 v1

RECORDED AT THE REQUEST OF
AND WHEN RECORDED RETURN TO:
(Document exempt from recording fees
pursuant to Cal. Gov. Code § 27383)

CITY OF HEMET
Attn: City Manager
445 East Florida Avenue
Hemet, California 92543
THIS SPACE FOR RECORDER’S USE ONLY

SUBDIVISION IMPROVEMENT AGREEMENT
FINAL TRACT MAP 33824-1
By and Between

THE CITY OF HEMET,
a municipal corporation
and
Richmond American Homes, a California Corporation
DATED January 24, 2023

Page 9 of 60 ends

7.H

Page 223 of 459 ends

RIV #4830-8901-9593 v1 - 1 -

SUBDIVISION IMPROVEMENT AGREEMENT
FINAL TRACT MAP 33824-1
This Subdivision Improvement Agreement (“Agreement”) is entered into as of this 24th day of January, 2023 by and between the City of Hemet, a municipal corporation (“City”) and Richmond American Homes, a California corporation (“Builder”). City and Builder are sometimes hereinafter individually referred to as “Party” and hereinafter collectively referred to as the “Parties.”

RECITALS
A. City of Hemet has previously approved Tract Map No. 33824-1 on September 28, 2016, along with proper and sufficient security.

B. McSweeny Recovery Acquisition, LLC, a Delaware Limited Liability Company, (“Developer”) has not completed all of the work or made all of the Public Improvements required by the Subdivision Map Act (Government Code sections 66410 et seq.), (“Map Act”) the City Ordinances, the conditions of approval for Tract No. 33824-1, or other ordinances, resolutions, or policies of City requiring construction of improvements in conjunction with the subdivision of land.

C. Builder has acquired the land known as Tract Map 33824-1 from Developer.

D. The City desires to enter into this Agreement amending and superseding the Subdivision Improvement Agreement by and between the City of Hemet, a municipal corporation and Developer, also known as Riverside County Recorder Office Document No. 2016-0436390 (“Original Subdivision Improvement Agreement”).

E. Builder has not completed all of the work or made all of the Public Improvements required by the Subdivision Map Act (Government Code sections 66410 et seq.), (“Map Act”) the City Ordinances, the conditions of approval for Tract No. 33824-1, or other ordinances, resolutions, or policies of City requiring construction of improvements in conjunction with the subdivision of land.

F. Pursuant to City Ordinances and the applicable provisions of the Map Act, Builder and City enter into this Agreement for the timely construction and completion of the Public Improvements and the furnishing of the security therefor, acceptable to the City Engineer and City Attorney, for Tract Map No. 33824-1.

G. City has authority to enter into this Subdivision Improvement Agreement pursuant to Government Code Sections 66499 – 66499.10.

H. Pursuant to Government Code Section 66499, Builder’s execution of this Agreement and the provision of the security are made in consideration of City’s approval of the final map for Tract Map No. 33824-1.

Page 10 of 60 ends

7.H

Page 224 of 459 ends

RIV #4830-8901-9593 v1 - 2 -

DEFINED TERMS
“Builder” shall mean Richmond American Homes, a California corporation. The term “Builder” shall also include all assignees, to the extent permitted under this Agreement, of the rights and obligations of Builder under this Agreement, and any successor-in-interest to Builder having a legal and/or equitable interest in the Property.
“Developer” shall mean McSweeny Recovery Acquisition, LLC, a Delaware Limited Liability Company. The term “Developer” shall also include all assignees, to the extent permitted under this Agreement, of the rights and obligations of Developer under this Agreement, and any successor-in-interest to Developer having a legal and/or equitable interest in the Property. “Estimated Costs” shall mean the City Engineer’s approximation of the actual cost to construct the Public Improvements, including the replacement cost for all landscaping. “Litigation Expenses” shall mean all costs and expenses, to the extent reasonable in amount, actually and necessarily incurred by a party in good faith in the prosecution of an action or proceeding, including, but not limited to, court costs, filing, recording, and service fees, copying costs, exhibit production costs, special media rental costs, attorneys’ fees, fees for investigators, witness fees (both lay and expert), travel expenses, deposition and transcript costs and any other cost or expense, the award of which a court of competent jurisdiction may determine to be just and reasonable.
“Map Act” shall mean the Subdivision Map Act, Government Code Sections 66410 et seq. “Property” shall mean the all of the real property contained within the boundaries of Tract Map No. 33824-1 located in the City of Hemet, California, as is more particularly described in the legal description and parcel diagram attached hereto and incorporated hereby by reference at Attachment “A”.
“Public Improvements” shall include, but not be limited to, recertification of rough graded pads, finish grade, repair existing streets, curbs and gutters, sidewalks, water systems, sanitary sewers, utilities, and drainage facilities (if any), landscaping, street lights and all other facilities required to be constructed and dedicated to the City or other public entity as conditions of approval of Tentative Tract Map No. 33824-1 and as shown in detail on the plans, and specifications which have been approved by the City and incorporated into Tract Map No. 33824-1. The Parties agree that the Public Improvements to be completed by Builder are more specifically described in the diagram or plan attached hereto and incorporated herein by reference as Attachment “B.

Notwithstanding, Attachment “B”, Builder shall remain obligated to construct and complete all of the Public Improvements required as conditions of approval for Tract Map No. 33824-1, a full copy of which is on file with and may be obtained from the Engineering Department of the City of Hemet.
“Required Insurance” shall mean the insurance required to be maintained by Builder under Section 17.
“Security” shall mean surety bonds in the amounts and under the terms of Section 12 or other security approved by City Engineer or City Attorney.