Cities Index.
Agenda

Hemet City Council
November 12, 2025

Document
Agenda
Meeting
November 12, 2025
Body
Hemet City Council
Pages
593
Original file
34.9 MB
Text extracted from the city's file for reading and search. Open the original on hemetca.civicweb.net. That file is the official record.

AdminWRBConstruction.com
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275ICALicense#1055746IDIR#1000884610 l\l:lrEKQUIVIVELNEZARALSMADIIEXECUTIVECONSTRUCTIONPROJECTMANAGERORANGECOUNTYGREATPARK— VISITORCENTERPA VILION&SOUTHLAWNPROJECTCityofIrvineI2013I$22.8MProjectEngineerIJr.ProjectManagerThisprojectincludedtheconstructionofanewVisitorCenterPavilion,andexpansionoftheGreatPark'ssportsprogramsandotheruniquefeaturesalongthe‘SouthLawn’oftheGreatPark.ThepositiveeconomicimpactfromthisprojectresultedtoI5%oftheparksfootprintatthetime,withtheSouthLawnportionOfthisprojectalonegeneratingmorethan50full-timeequivalentconstructionjobsfortheOrangeCountyeconomy.TheVisitorCenterPavilionconsistedOfanewground-up5,000Sq-FtuniquebuildingthatbecametheGreatPark’sfirstnewpermanentbuilding.Thisbuildingincludedfeaturessuchasalargelobby,restroomfacilities,concessionareas,exhibitionareasandOfficespaces.TheSouthLawnincludedfeaturessuchasfourtournament-qualitysoccerfields(encompassedofsyntheticandnaturalgrass)withprofessionallightfeatures,concretebasketballcourts,750-ftwalkablehistoricaltimelinewalkwaymadeupofpaversandtherebyconnectingtheSouthLawntothefamous400-fthighGreatPark’sorangeballoon,restroomfacilities,joggingandexercisetrailsmadeofdecomposedgranite,400+landscapetreeplantings,sixpondsthatbecametheparksfirstswaterfeatures,andastate-of-the-artstormwatercollectionmanagementsystemwithfiltrationandstorestormwatermixedwithreclaimedwaterfromIrvineRanchWaterDistrict.ThesophisticationoftheinfrastructureimprovementsOfthisdevelopmentincludedundergroundwetanddryutilities,electricalequipmentandlighting,drainageimprovements,irrigationssystems,concreteandmasonryconstruction,asphaltroadways,landscapeimprovements,andfencingthroughouttheproject.Thecomplexityofthisproject,inadditiontotheObstaclesofthestringentregulationsoftheGreatPark,thisProjectcreateduniquechallengesthatrequiredadistinctivetypeofexperiencedmanagementskillstoovercomesuchobstacles.Theoutcomeofthisprojectresultedtoacquiringthe2013ProjectoftheYearAward(AmericanPublicWorksAssociation,SouthernCaliforniaChapterSouthLawnStormWaterManagementSystem).

ADDITIONALPRIOREXPERIENCElSICALIFORNIAI2OIO-2023Alongwiththeprojectslistedabove,Nezar’sexperienceincludesasubstantiallistofadditionalProjectsrelatingtotheConstructionareasindicatedundertheQualificationssection;someoftheseprojectsare- ° CaltransHighwayRealignmentProject(subtoGraniteConstruction)— UndergroundUtility&ConcreteDiv.I$15.8M ° FailingRetainingWallReplacementsIBrea,CAI$150K' Concrete&MasonryExclusiveContractorIOrange&LACountiesI$450K(in2022) ° LotGrading&DrainageSystemProjectICorona,CAI$90K' NewADUGround—UpConstructionIIrvine,CAI$400K ° DowntownLARehabilitationProjectILosAngeles,CAI$3.2M
° ConcreteRoadwayImprovementProjectICypress,CAI$615K' Pool&BalconyAdditionProjectIIrvine,CAI$500K' NewFree-standingPatioCoverINewportBeach,CAI$75K' NewFree-standingPatioCoverILagunaBeach,CAI$67K ° TwoCommunityPoolsPlasterandDecksReplacementProjectINorwalk,CAI$350K WERBUILDERS,INC. WWW.WRBCONSTRUCTION.COMPORTFOLIPage 67 of 170

16.D.

Page 159 of 593 ends

[email protected]
ALBERTOG.BERDERAJR.1ESTIMATOR/PROJECTENGINEER

QUALIFICATIONS
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055746|DIR#1000884610 KEYPERSONNELCREDENTIALSJBachelorofScienceinCivilEngineeringJBuildandDesignContractorinPhilippinesJCerti?edConstructionOccupationalSafetyandHealth(COSH)inPhilippinesJCerti?edBasicOccupationalSafetyandHealth(BOSH)inPhilippinesRELEV ANTSKILLSJConstructionSupervision&SiteManagementBOQ(BillofQuantities)PreparationJAutoCAD,SketchUp,Lumion(3DModeling& SiteInspection&ProgressMonitoringConstructionQualityAssurance&QualityControl(QA/QC)MaterialsTesting&InspectionProceduresPermitApplication&ComplianceDocumentationClienWendorRelations&NegotiationBusinessProcessOptimizationSales&Operations(ConstructionMaterialsSupply)MultitaskingunderPressureAdaptabilityinRemoteWorkEnvironmentsAttentiontoDetailwithEngineering&FinancialData RenderingArchitectural&StructuralDraftingQuantityEstimating&MaterialTake-OffBuildingCode&PermitProcessingWaterSystemInfrastructure(Gov'tProjects)Inventory&SupplyChainManagementBudgeting&FinancialOversightProjectScheduling&WorkBreakdownStructures(WBSBlueprintReading&Interpretation \\\\\\\\ \\\
Accomplishedandhands-onProjectEngineerwithextensiveexperienceintheconstructionandcontractingindustry.Albertohasbuiltastrongreputationfordeliveringqualityresultsacrossbothpublicandprivatesectorprojects,specializingincivilworks,sitemanagement,structuraldesign,andconstructioncoordination.Withover7yearsofexperience,Albertohasplayedacriticalroleinsuccessfullycompletinggovernmentinfrastructureprojects,watersystemfacilities,residentialbuildings,andcommercialdevelopments.Hehasmanagedconstructionprojectsrangingfrommodest-scalejobstomulti-millionpesobuilds,ensuringon—timedelivery,regulatorycompliance,andhigh-qualityworkmanship.Alberto'sstrengthsincludehisdirectsupervisionofconstructionworkers,day-to-daymanagementofsiteoperations,andstrongtechnicalcapabilityinproducingarchitecturaldrawings,3Dmodels,anddetailedblueprintsusingtoolslikeAutoCAD,SketchUp,andLumion.Hisproactiveleadershipinthe?eldfostersacultureofaccountability,safety,andcollaborationamongworkers,subcontractors,andengineers.Inadditiontositeexpertise,Albertohasexperienceincontractpreparation,materialprocurement,andpermitprocessing,makinghimanall-aroundassetinanyconstructionenvironment.Hisbackgroundasbothaprojectengineerandformerconstructionsupplybusinessownerhasgivenhimauniqueadvantageinlogistics,costcontrol,andclientrelationshipmanagement.Alberto'sexposurespansacrossgeneralcivilengineering,waterinfrastructure,concreteandmasonrywork,fencingsystems,andinteriorrenovations—bringingbothtechnicaldepthandmanagerial?exibilitytoeveryprojectheundertakes.

WERBUILDERS,INc. WWW.WRBCONSTRUCTION.COMQUALIFICATIONPORTFOLIPage 68 of 170

16.D.

Page 160 of 593 ends

AdminWRBConstructlon.com

FESSIONAL
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055746|DIR#1000884610PROEXPERIENCEFENCINGPROJECT-GOVERNMENTINFRASTRACTURENewCorella,Philippines|2020|2.3MProjectEngineer|SiteSupervisorThisgovernment-awardedcontractinvolvedtheconstructionofperimeterfencingforapublicfacility.Workincludedexcavation,formworks,steelbarinstallation,concretecasting,and?nishingforreinforcedconcretepostsandblockwallinstallation.AsProjectEngineer,Isupervisedlaborersandcoordinatedwithgovernmentinspectorsandsubcontractorstoensureadherencetolocalbuildingcodesandsafetystandards.Throughclearcommunication,dailytaskplanning,andresourcemanagement,theprojectwasdeliveredaheadofschedulewithhighclientsatisfaction.KeyContributions:/ Oversawacrewof20+workers,ensuringefficienttaskdelegationandcompliancewithsafetystandards./ Monitoredmaterialdeliveries,conducteddailyinspections,andmaintainedqualitycontrolthroughoutconstruction/ Facilitatedgovernmentinspectionsandprocessedrequiredcompliancedocumentsforprogressbilling.2-STOREYAPARTMENTCONSTRUCTIONSanMiguel,TagumCity,PhilippinesI2021|4.1MProjectEngineer|ConsultantResponsibleforsupervisingconstructionfromexcavationto?nishingforaprivatelyownedapartmentcomplex.Theprojectincludedstructuralconcretework,masonry,plumbing,electricalrough-ins,andcoordinationwithdesignprofessionals.Workingcloselywiththeclient,Iprovidedtechnicalinsightstooptimizelayoutefficiency,reducecost,andimprovedurability.KeyContributions:/ Deliveredfullsupervisionduringstructuralworksand?nishingstages.\/Advisedondesignmodi?cationstomeetbudgetwithoutsacri?cingquality.JMaintainedsitesafety,documentation,andcontractorcoordinationtominimizedelays.W ATERSYSTEMFACILITY-DEPARTMENTOFPUBLICWORKANDHIGHW AYSPROJECT(DPWH)DavaoRegion,Philippines|2019|3.8MProjectEngineer|GovernmentContractorPartofapublicinfrastructureinitiativeledbytheDepartmentofPublicWorksandHighways(DPWH),thisprojectfocusedonconstructingafullyoperationalwatersystem,includingintakeboxes,transmissionlines,andreservoirtanks.Taskedwithleadingconstructioncrews,managingtimelines,andensuringregulatorycompliance.KeyContributions:/ Directed?eldactivitiesinvolvingexcavation,pipe-laying,concretetankconstruction,andpressuretesting.IEnsuredaccuratealignmentandgradientofwaterlinesusingsurveyingtools./ CoordinatedwithDPWHengineersforinspectionandturnoverprocedures.

WERBUILDERS,INC. WWW.WRBCONSTRUCT|ON.COMPORTFOLIPage 69 of 170

16.D.

Page 161 of 593 ends

[email protected]
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055746|DIR#1000884610ONE-STOREYRESIDENTIALHOUSE-DESIGN&SUPERVISIONDahlia,TagumCity|2021l1.5MProjectEngineer|DesignerEnd-to—endmanagementofaprivateresidentialbuildfrominitialconcepttomove-in.Responsibleforarchitecturalandstructuralplanning,3Dvisualization,constructionsupervision,andclientconsultations.KeyContributions:JCreateddetailedplansand3DrendersusingSketchUpandLumion.JDeliveredastructurallysoundandvisuallyappealinghomedesignwithinclientbudget.JSupervisedlaborerson-Site,monitoredquality,andaddresseddesignrevisionsswiftly.FENCINGPROJECT-DESIGNANDBUILDCamellaHomes,TagumCity|2021|1.8MProjectEngineer|Design-BuildLeadThisprivatedevelopmentprojectinvolvedthefulldesignandconstructionofaperimeterfencingsystem,includingreinforcedconcretefootings,CHBwallsections,anddecorative?nishestailoredtosubdivisionstandards.Mydualroleincludedarchitecturaldesign,estimating,materialprocurement,andon-Sitesupervisionfrommobilizationtoturnover.KeyContributions:JDesignedfencelayoutwith3Dvisualizationtoaidclientapproval.JSupervisedskilledmasonsandlaborers,ensuringadherencetoengineeringstandardsandCamella’sdesignguidelines.JManagedprocurementanddeliveryschedulestoavoidworkstoppagesanddelays.3-STOREYHOUSEPROJECTDavaoCity,Philippines|2022|7.5MProjectEngineer|Design&CoordinationOversawthedevelopmentofathree-storeyresidentialhome,workingcloselywiththeclientanddesignprofessionalstoalignengineeringwithaestheticgoals.Tasksincludedfoundationwork,structuralframing,MEPcoordination,andarchitecturaldetailing.KeyContributions:JEnsuredaccuracyofverticalalignmentandstructuralsafetyacrossthreefloors.JCoordinatedsubcontractorsforplumbing,electrical,andinterior?t-out.JMaintainedacleanworkflowanddetailedprojectlogstostreamlineprogressreportsandbilling.RESIDENTIALINTERIORRENOV ATION-DESIGNANDBUILDCamellaHomes,TagumCity|2022|950KProjectEngineer|InteriorWorksLeadLedthedesignandbuildofafullinteriorrenovationproject,transformingastandardresidentiallayoutintoamodern,customizedlivingspace.Tasksincludedspaceplanning,ceilingworks,tileandpaint?nishes,carpentry,andlightinglayoutsKeyContributions:

WERBUILDERS,INC. WWW.WRBCONSTRUCTION.COMQUALIFICATIONPORTFOLIPage 70 of 170

16.D.

Page 162 of 593 ends

Admin@WRBConstruction,com
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055746|DIR#1000884610/ Provided3Dinteriorrendersforapprovalbeforeexecution.\/Coordinatedcarpentersandinteriorfinishingteamsforqualityandtimelydelivery/ Introducedvalueengineeringtooptimizematerialsandreduceprojectcost.2-STOREYCOMMERCIALBUILDING-DESIGNONLYNationalHighway,TagumCity|2023|PGM(EstimatedBuildValue)ProjectEngineer|ArchitecturalDesignerCommissionedtodeveloptheconceptualandtechnicaldesignofacommercialstructurelocatedalongamajorhighway.Deliveredfloorplans,elevations,sections,and3Drenderingsforclientinvestmentandpermitsubmission.KeyContributions:/ ProducedalldrawingsusingAutoCADandSketchUpwithLumionrendersupport./ IntegratedMEPcoordinationandparkinglayouttosupportbusinessuse.\/Assistedclientwithbuildingpermitprocessingandregulatorycoordination.

WERBUILDERS,INC. WWW.WRBCONSTRUCTION.COMQUALIFICATIONPoRTFOLIOPage 71 of 170

16.D.

Page 163 of 593 ends

[email protected]

MIRAMONTES, ,
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275jCALicense#1055746|DIR#1000884610ALEX|SUPERINTENDENTKEYPERSONNELRELEV ANTSKILLS5+yearsofexperienceinundergroundutilityandcivilinfrastructureconstruction.3DemonstratedleadershipasCrewForeman,CompetentPerson,andTeamLeadonlarge-scaleinfrastructureprojects.Deepunderstandingoftrenching,conduitinstallation,potholing,andsubstructurelayoutaccordingtoSDGEandEdisonstandards.Skilledinoperatingheavyequipmentincludingbackhoes,skidsteers,andpneumatictools.inPro?cientinreadingconstructionplans,identifyingtrenchlines,andplanningvault/potholeplacements.Certifiedtochipencasementonliveutilitypackages.Experiencedinweldingsteelplatesforjobsitesafetyandstructuralsupport.|: StrongtrackrecordofmaintainingsafeworkzonesandenforcingOSHA,company,andutility-specificsafetyprocedures.aExperiencedwithtraf?ccontrolsetupbasedonW ATCHmanualsandengineeredspeci?cations.l:Solidcommunicationskillsandteamcoordinationacrosslaborers,supervisors,andstakeholders.QUALIFICATIONSAlexMiramontesisadrivenandhands-onconstructionprofessionalwithoverfiveyearsofexperienceinundergroundutilityinfrastructure.HiscareerspansrespectedfirmssuchasHenkels&McCoyandArizonaPipeline,whereheadvancedintofieldleadershiprolesduetohisstrongtechnicalknowledge,safety-firstmindset,andproblem—solvingabilities.From2020to2025,Alexhasdemonstratedproficiencyinleadingcrewsthroughchallengingprojects,includinginstallingconduitsystems,trenchingoperations,andpotholing,allincompliancewithutility-speci?cstandardslikeSDGEandSCE.Hisabilitytointerpretconstructionplansandeffectivelytranslatethemintofieldlayoutshasledtosuccessfulexecutionandcompletionofprojects,includingamajorutilityupgradeinLaJolla,CA.Alexiscertifiedtoworkonliveutilityencasementsandhasdevelopedahighleveloftechnicalcompetencyinequipmentoperation,welding,andjobsitesafety.Knownforhisleadershipandworkethic,heplaysapivotalroleinensuringthatprojectsrunonscheduleandmeetthehigheststandardsofqualityandcompliance.AsaSuperintendentatWeRBuilders,Inc.,Alexbringsvaluablefrontlineexperienceandanunwaveringcommitmenttosafety,efficiency,andteamwork—ensuringprojectmilestonesareachievedandclientexpectationsareexceeded.PROFESSIONALEXPERIENCE SuperintendentResponsibilitiesIncludetheFollowing—
/ Managethecontractor’sparticipationinpublicbidopportunities,ensuringallbiddocumentsaresubmittedaccuratelyandontime.WERBUILDERS,INc. WWW.WRBCONSTRUCTION.COM PROJECTSUPERINTENDENT,WERBUILDERS,INC.LosAngeles&CityofPalmDesert|January2025—Present

Page 72 of 170 ends

16.D.

Page 164 of 593 ends

Admin@WRBConstruction,com

ADDITIONALPRIOREXPERIENCE
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055745|DIR#1000884610\/Analyzeprojectdrawings,technicalspeci?cations,andcontractrequirementstodeterminekeyobligationsandlimitations.Workcloselywiththeestimatingteamtodeveloppreciseandcompetitivecostestimatesforbidsubmissions.Coordinatewithsubcontractors,suppliers,andvendorstocon?rmtheavailabilityofnecessarylabor,materials,andequipment.Createcomprehensiveprojectschedulesoutliningkeymilestones,deadlines,andcriticalpaths.Trackprojectperformance,proactivelyidentifyingandresolvingpotentialdelaysorchallenges.Performroutinesiteinspectionstoverifyadherencetosafetystandards,qualityexpectations,andprojectspecifications.Overseeprojectfinancials,includingexpensetracking,invoiceapproval,andcostcontrol.Maintainregularcommunicationwithclients,architects,engineers,andstakeholderstoprovideupdates,addressconcerns,andensuresatisfaction.Leadandsupportsitepersonnel,offeringsupervision,mentorship,andtrainingasrequired.Compileandsubmitessentialprojectdocuments,includingprogressreports,changeorders,andrelatedrecords.

PROJECTFOREMANHenkels&McCoy-SanDiego,CAInfrastructureTechLaborer-January2020-October2023Servedasteamlead,competentperson,andactingforemanasneeded.InstalledconduitandutilitysubstructuresincompliancewithSDG&EundergroundconstructionstandardsSupportedtrenchandsubstructurelayoutactivitieswithsolidunderstandingofconstructionplans.Utilizedpneumatictoolsandhandtoolsfortrenchingandpotholing.MaintainedasafejobsitebystrictlyadheringtoOSHA,SDG&E,andcompanysafetyprotocols.ArizonaPipeline—Corona,CAInfrastructureLaborer|Oct2023—Oct2024Actedasteamleadanddesignatedcompetentpersononjobsites.Certi?edtochipencasementsonliveutilitypackages.Setuptraf?ccontrolzonesinaccordancewithW ATCHManualandengineeredtrafficplans.Operatedpneumaticandhandtoolsfordailyexcavationandinstallationwork.Promotedasafety-?rstculture,complyingwithOSHA,Edison,andcompanysafetystandards.Henkels&McCoy—SanDiego,CACrewForeman|Oct2024-Jan2025Directedcrewsinmarkingtrenchlines,potholes,andvaultlocations.Operatedheavyequipment,includingskidsteersandbackhoes.Performedweldingofsteelplatestomitigateon-sitehazards.EnsuredcompliancewithOSHA,SDG&E,andinternalsafetyguidelines.ContributedtosuccessfulprojectcompletioninLaJolla,CA.Demonstratedpro?ciencyinblueprintandplaninterpretation.

WERBUILDERS,INC. WWW.WRBCONSTRUCTION.COMQUALIFICATIONPORTFOLIPage 73 of 170

16.D.

Page 165 of 593 ends

[email protected]
RDERA
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055746]DIR#1000884610HANAQUEENBE|ACCOUNTINGIADMINKEYPERSONNELRELEV ANTSKILLS5+yearsofexperienceinaccounting,bookkeeping,andadministrativesupportwithinfast-pacedof?ceenvironments.ElProvenleadershipasAccountant,Of?ceManager,andTeamLeadonkeyfinancialreportingandadministrativeprojects.:1ln-depthknowledgeofaccountspayable/receivable,generalledgermanagement,andmonth-end/year-endclosingproceduresincompliancewithGAAPstandards.: Pro?cientinutilizingaccountingsoftwaresuchasQuickBooks,SAP,andMicrosoftExcelforfinancialreporting,budgeting,anddataanalysis.:IExperiencedinpreparingfinancialstatements,reconcilingaccounts,andmaintainingaccuraterecordstoensuresmoothauditprocesses.:1Strongbackgroundinpayrollprocessing,invoicing,andmanagingvendor/clientcommunicationsfortimelypaymentsandcollections.:1Skilledinadministrativedutiesincludingscheduling,documentmanagement,andmaintainingorganized?lingsystemstosupportdailybusinessoperations.Solidtrackrecordofmaintainingregulatorycomplianceandimplementinginternalcontrolstooptimizeoperationalefficiencyandmitigaterisks.:1Experiencedincoordinatingcross-functionalteams,collaboratingwithmanagement,andliaisingwithexternalauditors,vendors,andclients.r:Excellentcommunicationandproblem-solvingskillswiththeabilitytomanagecompetingprioritieswhilemaintainingaccuracyandattentiontodetail.

QUALIFICATIONSHanaQueenBerderaisaresults-orientedaccountingandadministrativeprofessionalwithover?veyearsofexperiencesupportingbusinessesacrossthe?nancial,e-commerce,andcustomerservicesectors.ShehascontributedtothesuccessoforganizationssuchasMBMBookkeepingServices,A&CConstruction,andMCVOTalentOutsourcingbycombiningfinancialaccuracy,administrativeef?ciency,andclient-focusedsupport.From2019to2024,Hanadevelopedexpertiseinmaintainingaccurate?nancialrecords,reconcilingaccounts,andpreparingkey?nancialreportsincludingbalancesheetsandpro?t&lossstatements.Herexperienceextendstomanagingvendorrelations,overseeingpurchasingoperations,andsupportingcompliancewithauditandregulatorystandards.Shehasalsodemonstratedstrongadministrativeandcommunicationskills,providingchat/emailsupportandcustomerserviceforlarge—scaleoutsourcing?rms.Hanaispro?cientinQuickBooks,MicrosoftOf?ce,GoogleSuite,andvariousvirtualassistanttools,enablinghertothriveinbothon-siteandremoteenvironments.Recognizedforheradaptability,attentiontodetail,andcommitmenttoserviceexcellence,Hanacontinuestobringvaluetoeveryteamshejoinsbyensuringoperationsrunsmoothly,?nancesarewell-managed,andclientsarewell-supported.PROFESSIONALEXPERIENCE WERBUILDERS,INC. WWW.WRBCONSTRUCT|ON.COMPage 74 of 170

16.D.

Page 166 of 593 ends

AdminWRBConsIruc?on.com
WeRBuilders,Inc.1608PalmyritaAve,Riverside,CA92507714.874.5275|CALicense#1055746|DIR#1000884610BOOKKEEPER|MBMBookkeepingServicesRemote|September2021—January2023/ Maintainedaccurateandorganizedrecordsofall?nancialtransactions,includingaccountsreceivable/payable,expenses,andreceipts.Reconciledbankandcreditcardstatements,identifyingandresolvingdiscrepanciestoensureledgerintegrity.Preparedmonthlyandquarterly?nancialstatements,includingbalancesheets,incomestatements,andcashflowreports.Managedgeneralledgerfunctionsandjournalentries,supportingmonth-endandyear-endclosings.Collaboratedwithclientsandexternalaccountantstoassistwithtaxfilingsandauditreadiness.BOOKKEEPERIACCOUNTANTIPURCHASER|A&CConstructionPhilippines|December2019—July2021Recordedandtrackedall?nancialtransactions,maintainingup—to—datebooksforconstruction-relatedoperations.Prepareddetailed?nancialreportsandconductedanalysistosupportcompanybudgetingandforecasting.Oversawpurchasingoperations,monitoredinventorylevels,andensuredtimelyprocurementofmaterialsandsuppliesMaintainedproperdocumentationofpurchaseorders,vendorinvoices,andcontractsforauditandcompliancepurposes.Coordinatedwithprojectmanagerstoalignprocurementand?nancialplanningwithongoingconstructionneeds.DATAENTRYOPERATORlCHAT&EMAILSUPPORT|MCVOTalentOutsourcingServicesRemote|May2023—December2024Deliveredprofessionalandtimelycustomersupportvialivechatandemailforclientsacrossmultipleindustries.Accuratelydocumentedcustomerinteractionsandmaintaineddetailedrecordsusinginternalsystems.Ensuredadherencetodataprivacyandsecurityprotocolsduringcustomercommunications.Providedadministrativesupportbyinputting,organizing,andvalidatinglargevolumesofdataacrosscompanyplatforms.Contributedtotheimprovementofcustomersatisfactionscoresthroughef?cientandempatheticservicedelivery.CUSTOMERSERVICEREPRESENTATIVE|IBEXGlobalInc.Philippines|August2018—March2019\/Managedhigh-volumeinboundinquiries,providingeffectiveresolutionsandmaintaininga98%customersatisfactionrating.\/Receivedrecognitionasatop-performingagentforexceedingperformancemetricsinqualityandef?ciency./ Collaboratedwithteamleadstoimproveresponsestrategiesandoptimizeservicedelivery.STOREHEADlFINANCIALRECORDKEEPER|StoresSpecialistsInc.Philippines|October2008—May2015JOversawdailystoreoperationswhilemaintaining?nancialrecordsandensuringaccuracyinsalesandexpensetracking.\/Prepared?nancialforms,generatedreports,andsupportedthe?nancedepartmentwithroutinecalculations./ Playedakeyroleinmanaginginventoryandstaffschedules,contributingtoconsistentstoreperformance.

WERBUILDERS,INc. WWW.WRBCONSTRUCTION.COMPORTFOLIPage 75 of 170

16.D.

Page 167 of 593 ends

BIDSCHEDULEBASEBID—2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT,CIPNo.2415 EXTENDEDIE?DESCRIPTIONUNIT?lm/:55UNITPRICEITEMAMOUNT1 MobilizationIDemobilization(nottoL3 1 503000050,00000exceed5%)2 TrafficandPedestrianControlL31 30,000QSo,0001’33 WaterQualityControlLS1 15000.0015,000.004 FieldOrdersLS1 $10,000$10,0005 TemporaryConstructionProjectLS1 5,000005,00000IdentificationSignageFurnishandInstall8"PVCC-900, 54000006 Class200WaterMainLF20° 270'00’ ' FurnishandInstall10"PVCC-900, 426600.007 Class200WaterMainI'F2’370180'00' FurnishandInstall10"CL52,DJ8 WaterMainlineTytonPush-onLF75 300'0022’500'00JointsFurnishandInstall12"PVCC-900, 121000009 Class200WaterMainLF55° 220'00’ ' 10Trenching,BackfillandRepavingLF3,15028_0088.200.00FurnishandInstall6”RSGV .(FLx 48000011 FL)WIRestrainsEA2 2,400.00.- FurnishandInstall8"RSGV .(FLGx 81000012 P.O.)WIRestrainsEA3 2'700'00’ 13Furnishandlnsta!l8"TranSItlonEA2 950.001’90000Couphng14FurnishandInstall10"11.25DegreeEA7 1,400.009,800.00l?bow15FurnishandInstall10"45DegreeEA18 1,800.0032,40000l?bow16FurnishandInstall10"90DegreeEA3 1,800.005140000Elbow17FurnishandInstall10"SteelFlangeEA2 990_001,980.00FurnishandInstall12"x12"x8"x8"27500018 DJ.FlangedCrossEA1 2’750'00’ ' 19FurnishandInstall12"x12"x8"D.l.EA1 210000210000FlangedTee20FurnishandInstall12"x12"x6"D.l.EA2 1,200.002,400.00FlangedTeeFurnishandInstall12"RSGV .(FLG 2021 xP.O.)WIRestrainsEA3 5'400'0016’00'022FurnishandInstall12"TransitionEA2 1,980.003,960.00Coupling

Page 76 of 170 ends

16.D.

Page 168 of 593 ends

BASEBID—2024/2025RAWW ATER-TREATEDW ATERPIPELINEFORTREATMENTPLANT, ITEMNo2324252627282930313233343536373839404142
CIPNo.2415DESCRIPTIONUNITRemoveExistingReducer.FurnishEAandInstall12”x8”ReducerConstructThrustBlockEAFurnishandInstall2"AirValveEAAssemblyFurnishandInstallModified2"EABlow-OffAssemblyFurnishandInstallWaterMainDropEAFlusherAssemblyFurnishandInstallWaterService. EAConnectionFurnishandInstallWaterMainEASupportPlugExistingWaterlineEASlurryBackfill8"WaterMainandLFAbandoninPlaceBreakThroughChannelandInsertPipe,ReconstructChannelWallperEADetailRemoveExistingWaterValveandEADelivertoCityYardRemoveExistingHydrantandEAFurnishandInstallNewFireHydrantRemoveandReplaceSidewalkSFRemoveandReplaceDrivewaySFApproachRemoveandReplaceADACurbEARampRemoveandReplaceType"A"CurbLFandGutterAdjustWaterValvetoGradeEARelocateTrafficControlBoxEARemoveExistingWaterMainLFRemoveandReplaceCrossGutterSF ESTIMATEDQUANTITY1272
39062018011330160 «.0TOTALBASEBID(numbers)“W110”
UNITPRICE1,480.00650.0011,000.007,400.0011,900.005,900.003,200.001000.0050.008,200.001,050.0012,500.0015.0029.0011,800.00105.004.000.008.200.0020.0058.00 EXTENDEDITEMAMOUNT1,480.0017.550.0022,000.007,400.0023,800.0029,500.0012,800.007.000.0019,500.0016,400.006,300.0025,000.005,850.00 11,800.008,400.004.000.008.200.006.600.009.280.00
************************************ITEMSH*****‘k**************************** 0,4809?

Page 77 of 170 ends

16.D.

Page 169 of 593 ends

QM Ono $evm+7Thwsaw‘BASEBIDTOTAL(inwords)cM“onHondm‘—FoorchHundredTNMYDollarsMal{ac/*0CemlsContractor'sInitialsNA ADDITIVEABIDITEMSTOTAL(inwords)(N/AlZeroDollarsandZeroCents Contractor'sInitialsNAintheeventofavariationbetweentheunitpriceandextendedtotal,theunitpricewillbeusedandthecorrectedextensionwillbeconsideredastheamountbid.lfthebidisillegibleandcannotbereconcileditwillbeconsiderednon-responsiveandwillnotbeconsideredforaward.Ifanadditiveand/oralternatebidscheduleiscalledforintheContractDocuments,thelowestbidwillbedeterminedonthebasisofthebasebidschedule(s)onlyunlessotherwisespecifiedintheNoticeInvitingBidsorbyAddendaifissuedtosupersedetheNoticeInvitingBidsonthisspecificissue.ForaContractwhereadeductivebidscheduleiscalledfor,thelowestbidwillbedeterminedbythetotalofallbidschedulesincludingthedeductivebidschedule(s).Regardlessofwhethertheadditive/deductiveoralternatesbiditemswillbeconsideredindeterminingthelowbid,theAgencymayelecttoincludeanyornoneoftheadditive/deductiveoralternatebiditems/schedules,ortootherwiseaddorremovecertainworkfromthescopeofWork.Accordingly,Contractorwarrantsthateachbiditemcontainsaproportionateshareofprofit,overheadandothercostsandexpenses,whichwillbeincurredbytheContractorfortheProject.Ifequallowbidsarereceivedfromresponsibleandresponsivebidderstheselectionshallbemadebydrawinglots,orothersimilarrandomblindmethodselectedbytheAgency.IfonlyoneresponsivebidisreceivedfromaresponsiblebiddertheawardshallnotbemadeunlessthepricecanbedeterminedtobereasonablebasedonananalysisbytheAgency.TheAgency'sdeterminationastothereasonablenessofanysuchbidshallbefinal.TheAgencyreservestherighttorejectanyorallbids,towaiveanyirregularity(ies),andtotakeallbidsunderadvisementforaperiodofsixty(60)calendardaysafterthedatethebidsarepubliclyopened.BidderacknowledgesthatallcostsincurredasaresultofpreparingtheproposalshallbethesoleresponsibilityofBidder.TheNoticeInvitingBidsandInstructionstoBiddersdoesnotcreateorimposeanyobligationupontheAgencytoenterintoacontract.Allbidsreceivedshallberecordedonanabstract(tabulation)ofbids,andthenmadeavailableforpublicinspectionwithintwobusinessdaysofbidopening.

Page 78 of 170 ends

16.D.

Page 170 of 593 ends

willnotberesponsible
Theundersignedherebyproposestofurnishanyandalllabor,materials,andequipmentforthe2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT;CIPNo.2415andappurtenantworkinconnectiontherewith,saidworktobedoneandmaterialstobefurnishedinstrictconformitywiththeContractDocuments,includingbutnotlimitedtotheNoticeInvitingBids,InstructionstoBidders,everyAddendum,plans,specifications,GeneralConditions,SpecialProvisions,GeneralProvisions,Greenbook2024asamendedandsupplemented,technicalreferences,allotherreferenceddocuments,allcodes,permitconditionsandregulations,forthetotalamount(s)andanyunitpricesandadditive/deductiveitemsshownonthisproposal.TheundersignedhasexaminedthelocationoftheproposedworkandalllocalandphysicalconditionsandchallengespresentedbytheProjectsite,isfamiliarwiththeplans,specifications,ContractDocuments(particularlyasdelineatedabove)andtherequirementsofthePublicWorksContract,andalsounderstandsthattheProjectshallbecompletelyconstructedinturn—keyconditionacceptabletotheOwnerwithintheProjecttimerequirementsforthepriceoftheproposal,includingallfeesandsalesand/orusetaxuponanymaterialssofurnished,includinganyunitpricesandadditive/deductiveitems.TheundersignedhasalsocarefullycheckedallofthefiguresgivenandunderstandsthattheAgency foranyerrorsoromissionsonthepartoftheundersignedinsubmittingthisproposal.Contractorconfirmsthathis/her/itsbidissubmittedwithrespecttothechangestotheContractand/orContractDocumentsincludedinalladdendaissuedbytheOwner.Inadditiontoreaffirmingthatthechangesandinformationcontainedintheaddendahavebeenintegratedintotheirproposal,ContractoracknowledgesreceiptofAddendaNo.(s)TheundersignedhasexaminedthecurrentStateofCaliforniascheduleofprevailingwageratesforthetypesofworktobedoneonthisproject(andtheDavis-BaconActiftheAgencyusesfederalfundsfortheProject)andagreestopaynotlessthantheserates.Theundersignedherebyproposestofurnishanyandalllabor,materials,andequipmentforthe2024/2025RAWW ATER— TREATEDW ATERPIPELINEFORTREATMENTPLANT,CIPN0.2415andappurtenantworkinconnectiontherewith,saidworktobedoneandmaterialstobefurnishedinstrictconformitywiththeContractDocuments,includingbutnotlimitedtotheNoticeInvitingBids,InstructionstoBidders,everyAddendum,plans,specifications,GeneralConditions,SpecialProvisions,GeneralProvisions,Greenbook2024asamendedandsupplemented,technicalreferences,allotherreferenceddocuments,allcodes,permitconditionsandregulations,forthetotalamount(s)andanyunitpricesandadditive/deductiveitemsshownonthisproposal.

Page 79 of 170 ends

16.D.

Page 171 of 593 ends

Sigg
pling
P”9
BIDSCHEDULEBASEBID—2024/2025RAWW ATER— TREATEDW ATERPIPELINEFORTREATMENTPLANT,CIPNo.2415 EXTENDED[TIES/IDESCRIPTIONUNITEéam?-E‘?UNITPRICEITEMAMOUNTMobilizationIDemobilization(notto 00 as1 exceed5%) LS “4,0179.’14/4'79""2 TrafficandPedestrianControlLS 1 15,000.0015,000.003 WaterQualityControlL8 1 3,000.003,000.004 FieldOrdersLS 1 10,000.0010,000.005 TemporaryConstructionProjectLSIdentificationnae 1,500-001,500.006 FurnishandInstall8"PVCC-900,LF200Class200WaterMain 125-0025000-00FurnishandInstall10”PVC0-900, 07 Class200WaterMainLF2’3701250'“3Qll050‘' FurnishandInstall10"CL52,DJ 5750043125008 WaterMainlineTytonPush—onLF75Joints9 FurnishandInstall12"PVCC-900,LF550Class200WaterMain 160.0088,000.0010Trenching,BackfillandRepavingLF3,150(00£9(genomz11FurnishandInstall6”RSGV .(FLx EA2FL)WIRestrains 4,400.008,800.0012FurnishandInstall8"RSGV .(FLGxEA3PD.)WIRestrains 5,400.0016,200.00FurnishandInstall8"Transition13 Cou EA2 1,200.002,400.0014FurnishandInstall10"11.25DegreeEA7Elbow 1,700.0011,900.00FurnishandInstall10"45Degree15 Elbow EA181,900.0034,200.00FurnishandInstall10"90Degree“5 Elbow EA3 1,900.005,700.0017FurnishandInstall10"SteelFlangeEA2 2,800.005,600.0018FurnishandInstall12"x12"x8"x8"EA1DJ.FlangedCross 3,000.003,000.0019FurnishandInstall12"x12"x8"D.IEA1FlangedTee 4,600.004,600.0020FurnishandInstall12"x12"x6"D.IEA2HangedTee 3,400.006,800.0021FurnishandInstall12"RSGV .(FLGEA3xP.OWIRestrains 7500-0022300-00FurnishandInstall12"Transition22 EA2 1,500.003,000.00

Page 80 of 170 ends

16.D.

Page 172 of 593 ends

aiqi?rw?mk¢ememm¢m§vm9a?4*kHvduvkk
BASEBID—2024/2025RAWW ATER— TREATEDW ATERPIPELINEFORTREATMENTPLANT, ITEMNo2324252627282930313233343536373839404142
CIPNo.2415DESCRIPTIONUNITRemoveExistingReducer.FurnishEAandInstall12”x8”ReducerConstructThrustBlockEAFurnishandInstall2"AirValveEAAssemblyFurnishandInstallModified2"EABlow-OffAssemblyFurnishandInstallWaterMainDropEAFlusherAssemblyFurnishandInstallWaterService. EAConnectionFurnishandInstallWaterMainEASupportPlugExistingWaterlineEASlurryBackfill8"WaterMainandLFAbandoninPlaceBreakThroughChannelandInsertPipe,ReconstructChannelWallperEADetailRemoveExistingWaterValveandEADelivertoCityYardRemoveExistingHydrantandEAFurnishandInstallNewFireHydrantRemoveandReplaceSidewalkSFRemoveandReplaceDrivewaySFApproachRemoveandReplaceADACurbEARampRemoveandReplaceType"A"CurbLFandGutterAdjustWaterValvetoGradeEARelocateTrafficControlBoxEARemoveExistingWaterMainLFRemoveandReplaceCrossGutterSF

ESTIMATEDQUANTITYUNITPRICE
1 1,700.0027250.002 8,500.001 11,500.002 7,000.005 5,400.004,200.00739060.0025,000.0025 200.002 10,000.0039035.0062040.001 5,000.003° 71.001 -1WWIQM3307.00' 16042.00TOTALBASEBID(numbers)
EXTENDEDITEMAMOUNT1,700.00
17,000.0011,500.0014,000.0027,000.0016,800.00
23,400.0050,000.00
1,200.0020,000.0013,650.0024,800.005,000.005,680.0015.00.

I!I07,I5700b
55 6,750.00
2,000.0014,000.00
2,000.002,000.002,310.006,720.00
BASEITEMS*****************************~k~k*****

Page 81 of 170 ends

16.D.

Page 173 of 593 ends

0M N CUR-‘1«may ”%0MA/vllli‘om0m.“Mi-Julsna—v3%4-KWa/BASEBIDTOTAL(inwords)he... 00'" Contractor'slnitialsBB
ADDITIVEABIDITEMSTOTAL(inwords)U/A’
Contractor'sInitialsBBIntheeventofavariationbetweentheunitpriceandextendedtotal,theunitpricewillbeusedandthecorrectedextensionwillbeconsideredastheamountbid.lfthebidisillegibleandcannotbereconcileditwillbeconsiderednon—responsiveandwillnotbeconsideredforaward.ifanadditiveand/oralternatebidscheduleiscalledforintheContractDocuments,thelowestbidwillbedeterminedonthebasisofthebasebidschedule(s)onlyunlessotherwisespecifiedintheNoticeInvitingBidsorbyAddendaifissuedtosupersedetheNoticeInvitingBidsonthisspecificissue.ForaContractwhereadeductivebidscheduleiscalledfor,thelowestbidwillbedeterminedbythetotalofallbidschedulesincludingthedeductivebidschedule(s).Regardlessofwhethertheadditive/deductiveoralternatesbiditemswillbeconsideredindeterminingthelowbid,theAgencymayelecttoincludeanyornoneoftheadditive/deductiveoralternatebiditems/schedules,ortootherwiseaddorremovecertainworkfromthescopeofWork.Accordingly,Contractorwarrantsthateachbiditemcontainsaproportionateshareofprofit,overheadandothercostsandexpenses,whichwillbeincurredbytheContractorfortheProject.lfequallowbidsarereceivedfromresponsibleandresponsivebidderstheselectionshallbemadebydrawinglots,orothersimilarrandomblindmethodselectedbytheAgency.IfonlyoneresponsivebidisreceivedfromaresponsiblebiddertheawardshallnotbemadeunlessthepricecanbedeterminedtobereasonablebasedonananalysisbytheAgency.TheAgency’sdeterminationastothereasonablenessofanysuchbidshallbefinal.TheAgencyreservestherighttorejectanyorallbids,towaiveanyirregularity(ies),andtotakeallbidsunderadvisementforaperiodofsixty(60)calendardaysafterthedatethebidsarepubliclyopened.BidderacknowledgesthatallcostsincurredasaresultofpreparingtheproposalshallbethesoleresponsibilityofBidder.TheNoticeinvitingBidsandinstructionstoBiddersdoesnotcreateorimposeanyobligationupontheAgencytoenterintoacontract.Allbidsreceivedshallberecordedonanabstract(tabulation)ofbids,andthenmadeavailableforpublicinspectionwithintwobusinessdaysofbidopening.

Page 82 of 170 ends

16.D.

Page 174 of 593 ends

sgecialtyitems
Thequantitieslistedinthebidproposalareprovidedtogiveageneralindicationofthescopeoftheworkandforthecomparisonofbids.Nowarrantyismade,eitherexpressedorimplied,thattheactualquantitiesofworktobedonewillcorrespondtherewith.Itemnumbersfollowedby”(S)”aredesignatedas whichwillnotbeincludedtowardsthecalculationofminimumof50percentofworktobeperformedbyContractor’sownforces.BysigningandsubmittingthisbidtheContractorconfirmsthattheyarefamiliarwiththeworksiteandallexistingconditionsthatmayaffecttheirworkandthattheyhavereadandagreetoalltheterms,conditionsandrequirementscontainedorreferencedhereinorintheContractDocumentsandthatalltheaforementionedhasbeenincludedinthebidpriceslistedabove,includingitemsofworkthatmaynothaveaspecificpaylineitemandthatthereshallbenoadditionalcoststotheAgency.W ARNING:IfanaddendumoraddendahavebeenissuedbytheAgencyandnotnotedaboveasbeingreceivedbythebidder,thisBidmayberejected.

Page 83 of 170 ends

16.D.

Page 175 of 593 ends

M/A
Completethefollowing:BordenExcavating,lnc
DBA(ifany)ShaunBorden,PresidentNameandtitleoftheownerBryceBorden,VicePresidentNameandtitleofsecondpartnerorofficer10142ndSt,Calimesa,CA92320BusinessAddress909—795-5410 69411746363501
[email protected]
10/23/2025 10/23/2025SignatureofBidderShaunBorden,PresidentBryceBorden,VicePresident Legalnameofthebusiness,DIRReg.andContractorLicenseNosCorporationBusinessType(Corporation,Partnership,SoleProprietor) Telephonenumber
Facsimilenumber
NameandEmailaddressofprimarycontactN/ACompanywebaddress DateSign Date
Printnameandtitle Printnameandtitle(/ftheBidderisacorporationtwosignaturesofcorporateofficersarerequired.)

Page 84 of 170 ends

16.D.

Page 176 of 593 ends

CERTIFICATEREGARDINGCONTRACTOR'SLICENSEl. ContractorisrequiredtopossessoneofthefollowingStateContractor'sLicenseStateofCaliforniaClass’A’Contractor’sLicenseCombinationofSpecialtyClass’C’Contractor’sLicenses2.Afailureto(1)possesstherequiredlicense,(2)truthfullysetforththefollowinginformation,and/or(3)executethisCertificatemayrendertheproposalnonresponsiveandpermittheCitytorejectthepreposal.(BusinessandProfessionsCodeSection7028.15)3.Contractordeclares,underpenaltyofperjury,thathe/she/itpossessestherequiredContractor's|icense(s)which:Bearsthelicensenumber(s)741879,ClassA b,Expireson06/30/2026
10/23/2025 10/23/2025
BryceBorden,VicePresident
ThisrequiredlicensedeterminationhasbeenmadebytheAgency.AnyContractorholdingadifferentlicensewhofeelsheisqualifiedtobidonthisworkmustsoadvisetheAgencyatleastseven(7)dayspriortothebidopening.TheAgencymayconductareviewofthecontemplatedworktore—evaluatetherequiredlicensedetermination.TheAgencymayinitssolediscretionmaintainorchangetherequiredlicensedetermination;Agency’sdecisionastotherequired SignatureofBidder er DateShaunBorden,PresidentPrintnameandtitle Printnameandtitle(lftheBidderisacorporationtwosignaturesofcorporateojj‘icersarerequired.) Date

Page 85 of 170 ends

16.D.

Page 177 of 593 ends

(S
k LUOg,AttorneyI
BIDSECURITYFORMFORBONDKNOWALLBYTHESEPRESENTS:ThattheundersignedBordenExcavating,Inc. (NameofContractor)asPrincipalandtheundersignedasSuretyareheldandfirmlybounduntoOwner,CITYOFHEMET,apoliticalsubdivisionoftheStateofCalifornia,asobligee,inthepenalsumof(DollarAmountInWords)TenPercentoftheTotalBidAmountDollars10%ofTotalBidAmountlawfulmoneyoftheUnitedStatesofAmericabeingatleasttenpercent(10%)oftheaggregateamountofsaidPrincipal'sbaseBid,forthepaymentofwhich,wellandtrulytobemade,webindourselves,oursuccessors,executors,administrators,andassigns,jointlyandseverally,firmlybythesepresents.WHEREAS,saidPrincipalissubmittingaBidfor2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT,2415THECONDITIONOFTHISOBLIGATIONISSUCHthatiftheBidsubmittedbythesaidPrincipalbeacceptedandtheContractbeawardedtosaidPrincipalandsaidPrincipalshallwithintherequiredperiodsenterintotheContractsoawardedandprovidetherequiredConstructionPerformanceBond,ConstructionLaborandMaterialPaymentBond,insurancecertificates,andallotherendorsements,forms,anddocumentsrequiredundertheInstructionstoBidders,thenthisobligationshallbevoid,otherwisetoremaininfullforceandeffect.INWITNESSWHEREOF,theaboveb‘oundenpartieshaveexecutedthisinstrumentthis22nddayof October 2025.(Month)BordenExcavating,Inc. (CorporateSeal) ByPrincipalByUS.SpecialtyInsuranceCompanySurety(CorporateSeal) BY n-Fact

Page 86 of 170 ends

16.D.

Page 178 of 593 ends

Dal:
mum
mm
eonthebasis0 atisfactoevidewhosename(s)Iaresubribedandacknowledgtomelh he/sh ENALTYO ERJURYforniathat foregoing
ersonsretoanathe

RIGHTTHUMBPRINTRIGHTTHUMBPRINTOFSIGNER
‘ CALIFORNIAALL-PURPOSEACKNOWLEDGMENTAnotarypublicorotherofficercompletingthiscertificateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscertificateisattached,andnotthetruthfulness,accuracy,orvalidityofthatdocument.STATEOFCALIFORNIACountyofOrangeOnOCT222025 personallyappeared
beforeme,
THAONGUYENLUUNotaryPubllc-CaliforniaOrangeCountyCommissionIt2453804Comm.Jul1|,2017 }
ThaoNguyenLuu ,NotaryPublic,InsertNameofNotaryexactlyasitappearsontheof?cialsealIreneLuongName(s)ofSigner(s) whoprovedtom fs ryncetobetheperson(s)is sctothewithininstrumented at e/theyexecutedthesameinhis/her/theirauthorizedcapacity(ies),andthatbyhis/her/theirsignature(s)ontheinstrumenttheperson(s),ortheentityuponbehalfofwhichtheperson(s)acted,executedtheinstrument.IcertifyunderP FP underthelawsoftheStateofCalithe paragraphistrueandcorrect.Witnessmyhandandofficialseal.SignaturePlaoeNotarySealAbove SignatureofNotary OPTIONALThoughtheinformationbelowisnotrequiredbylaw,itmayprovevaluabletop lyingonthedocumentandcouldpreventfraudulentremovalandreattachmentoftheformrdocument.DescriptionofAttachedDocumentTitleorTypeofDocument:DocumentDateSigner(s)OtherThanNamedAbove:Capacity(ies)ClaimedbySigner(s)Signer’sNameIndividualPartnerLimitedAttorneyinFactTrusteeGuardianorConservatorOther:

SignerisRepresenting
CorporateOfficer—Tit|e(s)General
Topofthumbhere
NumberofPages:

Signer’sNameIndividualCorporateOfficer—Tite(s):PartnerLimitedGeneralAttorneyinFactTrusteeGuardianorConservatorTopofthumbhereOther:

SignerisRepresenting

Page 87 of 170 ends

16.D.

Page 179 of 593 ends

'” FiRvMillionand00/100"’
(”550000000"'y
attached Iru!hlulnass,accuracxvalidity(hatdocument
SignKin ssisvanlSecretaryAmericanC
of
TOKIOMARINEHCC POWEROFATTORNEYAMERICANCONTRACTORSINDEMNITYCOMPANYTEXASBONDINGCOMPANYUNITEDSTATESSURETYCOMPANYU.S.SPECIALTYINSURANCECOMPANYKNOWALLMENBYTHESEPRESENTS:ThatAmericanContractorsIndemnityCompany,aCaliforniacorporation,TexasBondingCompany,anassumednameofAmericanContractorsIndemnityCompany,UnitedStatesSuretyCompany.aMarylandcorporationandUS.SpecialtyInsuranceCompany,aTexascorporation(collectively,the“Companies”),dobythesepresentsmake,constituted '
t:anappomYungT.Mullick,Jamesw.Moilanen,IreneLuong,EmilieGeorge,ChristineWoolford,DanielleHansonorP.AustinNeffofMissionViejo,CaliforniaitstrueandlawfulAttorney(s)-in-fact,eachintheirseparatecapacityifmorethanoneisnamedabove,withfullpowerandauthorityherebyconferredinitsname,placeandstead,toexecute,acknowledgeanddeliveranyandallbonds,recognizances,undertakingsorotherinstrumentsorcontractsofsuretyshiptoincluderiders,amendments,andconsentsofsurety,providingthebondpenaltydoesnotexceed DollarsThisPowerofAttorneyshallexpirewithoutfurtheractiononApril23rd,2026ThisPowerofAttorneyisgrantedunderandbyauthorityofthefollowingresolutionsadoptedbytheBoardsofDirectorsoftheCompanies:BeitResolved,thatthePresident,anyVice-President,anyAssistantVice-President,anySecretaryoranyAssistantSecretaryshallbeandisherebyvestedwithfullpowerandauthoritytoappointanyoneormoresuitablepersonsasAttorney(s)—in-FacttorepresentandactforandonbehalfoftheCompanysubjecttothefollowingprovisions:Attorney-in—FactmaybegivenfullpowerandauthorityforandinthenameofandonbehalfoftheCompany,toexecute,acknowledgeanddeliver.anyandallbonds,recognizances,contracts,agreementsorindemnityandotherconditionalorobligatoryundertakings,includinganyandallconsentsforthereleaseofretainedpercentagesand/or?nalestimatesonengineeringandconstructioncontracts,andanyandallnoticesanddocumentscancelingorterminatingtheCompany'sliabilitythereunder,andanysuchinstrumentssoexecutedbyanysuchAttorney-in-FactshallbebindingupontheCompanyasifsignedbythePresidentandsealedandeffectedbytheCorporateSecretary.BeitResolved,thatthesignatureofanyauthorizedof?cerandsealoftheCompanyheretoforeorhereafteraf?xedtoanypowerofattorneyoranycerti?caterelatingtheretobyfacsimile,andanypowerofattorneyorcerti?catebearingfacsimilesignatureorfacsimilesealshallbevalidandbindingupontheCompanywithrespecttoanybondorundertakingtowhichitisattachedINWITNESSWHEREOF,TheCompanieshavecausedthisinstrumenttobesignedandtheircorporatesealstobeheretoaf?xed,this18‘hdayofApril2022.AMERICANCONTRACTORSINDEMNITYCOMPANYTEXASBONDINGOMPANYUNITED COMPANYStateofCaliforniaCountyofLosAngeles By:DanielP ilar,VicePresident Onthis18‘”dayofApril2022,beforeme,SoniaO.Carreio,anotarypublic,personallyappearedDanielP.Aguilar,VicePresidentofAmericanContractorsIndemnityCompany,TexasBondingCompany,UnitedStatesSuretyCompanyandUSSpecialtyInsuranceCompanywhoprovedtomeonthebasisofsatisfactoryevidencetobethepersonwhosenameissubscribedtothewithininstrumentandacknowledgedtomethatheexecutedthesameinhisauthorizedcapacity,andthatbyhissignatureontheinstrumenttheperson,ortheentityuponbehalfofwhichthepersonacted,executedtheinstrument.IcertifyunderPENALTYOFPERJURYunderthelawsoftheStateofCaliforniathattheforegoingparagraphistrueandcorrect.WITNESSmyhandandof?cialsealature (seal)l, Lo,A ontractorsIndemnityCompany,TexasBondingCompany,UnitedStatesSuretyCompanyandUS.SpecialtyInsuranceCompany,doherebycertifythattheaboveandforegoingisatrueandcorrectcopyofaPowerofAttorney,executedbysaidCompanies,whichisstillinfullforceandeffect;furthermore,theresolutionsoftheBoardsofDirectors,setoutinthePowerofAttorneyareinfullforceandeffect.InV\?tnessWhereof,lhavehereuntosetmyhandandaf?xedthesealsofsaidCompaniesatLosAngeles,Californiathis22nddayOctoberCorporateSealsBondNo,NIAAgencyNo.7715-PDFPOA Secretary visittmhcc.com/suretyformoreinformation
SONIA0.CAREER)NmaryPublicCalilb'm'aLDSAngela;CountyhmmtssiunP1398710 ANotaryPublicorotherof?cercompletingthiscerti?cateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscerti?cateis andnotthe or of Z].2015
2025
KioLo,

Page 88 of 170 ends

16.D.

Page 180 of 593 ends

IL) 00“
BIDSECURITYFORMFORCHECKM.<"(/dA/Fd60mé’
NOTE:THEFOLLOWINGFORMSHALLBEUSEDINTHECASEOFCHECKACCOMPANYINGBIDAccompanyingthisproposalisaCertifiedCheckorCashier’sCheckpayabletotheorderoftheCityofHemet,hereinafterreferredtoas”Agency",for”/0dollars(S ,thisamountbeing10percent(10%)ofthetotalamountofthebid.Thischeckshallbereturnedtotheundersignedonlyifeitherofthefollowingoccurs:

A.IfsaidBidshallberejectedbytheAgency;B.IfsaidBidshallbeacceptedbytheAgencyandtheUndersignedshallexecuteanddeliveraContractintheformattachedhereto(properlycompletedinaccordancewithsaidBid)andshallfurnishbondsrequiredforhis/her/itsfaithfulperformanceofsaidContractandforthepaymentofallpersonsperforminglabororfurnishingmaterialsinconnectiontherewith,andshallinallotherrespectsperformtheContractcreatedbyacceptanceofsaidBid.Otherwise,saidcheckshallbecomethepropertyoftheAgencySaidcheckshallalsobecomethepropertyoftheAgencyiftheUndersignedshallwithdrawhis/her/itsbidwithintheperiodofsixty(60)calendardaysafterthedatesetfortheopeningthereof,unlessotherwiserequiredbylaw,andnotwithstandingtheawardoftheContractto 10/23/2025 10/23/2025
BryceBorden,VicePresident
anotherbidder
SignatureofBidder er DateShaunBorden,PresidentPrintnameandtitle Printnameandtitle{iftheBidderisacorporation,twosignaturesofcorporateo?icersarerequired.)

Page 89 of 170 ends

16.D.

Page 181 of 593 ends

DPRM
erea?e
heundersigned1mm: mmixsl'anerafthzmgafCali/omin‘dorebygem/3:zluzu'hmtheabuvecopya/sz‘?a/Authorilywitheduplicateafan'gimzawon?leinmy4mm Fee$117.00
Rec.No.Filed4/12/04
STATEOFCALIFORNIAEATENTOFINSURANCESANFRANCISCOAmendedCerti?cateofAuthority U.S.SpecialtyInsuranceCompany
No.

JohnGaramendi
THISISTOCERTIFY ,That,pursuanttotheInsuranceCodeoftheStateofCaliornia, ofHouston,Texas,organizedunderthelawsofTexas,subjecttoitsArticlesofIncorporationorotherfundamentalorganizationaldocuments,isherebyauthorizedtotransactwithinthisState,subjecttoallprovisionsofthisCerti?cate,thefollowingclassesofinsurance:Fire,Marine,Surety,Disability,Liability,Workers’Compensation,Aircraft,andMiscellaneousassuchclassesarenowormayhereafterbede?nedintheInsuranceLaWSoftheStateofCalifornia.THISCERTIFICATEisexpresslyconditionedupontheholderhereofnowandh rbeinginfullcompliancewithall,andnotinviolationofany,oftheapplicablelawsandlaw?zlrequirementsmadeunderauthorityofthelawsoftheStateofCaliforniaaslongassuchlawsorrequirementsareineffectandapplicable,andassuchlawsandrequirementsnoware,ormayhereafterbechangedoramended.INWITNESSWHEREOF,e?ectiveasofthe29thdayofDecember,2004,Ihavehereuntosetmyhandandcausedmyo?icialsealtobea?ixedthis29thdayofDecember,2004.

InsuranceCommissioner
By VictoriaS.SidburyforIdaZodl'owAsst.ChiefDeputyCerti?cationI,t eCo S hecomparedcate th Inandthatthesameisafull,true,andcorrecttranscriptthereofandofthewholeofsaidduplicate,andsaidCerti?cateofAuthorityisnowinfullforceande?ect.INWITNESSWHEREOF,Ihavehereuntosetmyhandandcausedmyo?’icialsealtobea?ixedthis14thdayofMarch,2007.

StevePoiznerInsuranceCommissioner
Pauline’Andrea

Page 90 of 170 ends

16.D.

Page 182 of 593 ends

l0/23/2025
ZWWSigMatu
NON-COLLUSIONAFFIDA VITPUBLICCONTRACTCODESECTION7106NON—COLLUSIONDECLARATIONTOBEEXECUTEDBYBIDDERANDSUBMITTEDWITHBIDTheundersigneddeclaresIamthe of thepartymakingtheforegoingbid.Thebidisnotmadeintheinterestof,oronbehalfof,anyundisclosedperson,partnership,company,association,organization,orcorporation.Thebidisgenuineandnotcollusiveorsham.Thebidderhasnotdirectlyorindirectlyinducedorsolicitedanyotherbiddertoputinafalseorshambid.Thebidderhasnotinanymanner,directlyorindirectly,soughtbyagreement,communication,orconferencewithanyonetofixthebidpriceofthebidderoranyotherbidder,ortofixanyoverhead,profit,orcostelementofthebidprice,orofthatofanyotherbidder.Allstatementscontainedinthebidaretrue.Thebidderhasnot,directlyorindirectly,submittedhisorherbidpriceoranybreakdownthereof,orthecontentsthereof,ordivulgedinformationordatarelativethereto,toanycorporation,partnership,company,association,organization,biddepository,ortoanymemberoragentthereof,toeffectuateacollusiveorshambid,andhasnotpaid,andwillnotpay,anypersonorentityforsuchpurpose.Anypersonexecutingthisdeclarationonbehalfofabidderthatisacorporation,partnership,jointventure,limitedliabilitycompany,limitedliabilitypartnership,oranyotherentity,herebyrepresentsthatheorshehasfullpowertoexecute,anddoesexecute,thisdeclarationonbehalfofthebidder.IdeclareunderpenaltyofperjuryunderthelawsoftheStateofCaliforniathattheforegoingistrueandcorrectandthatthisdeclarationisexecutedon [date],atcity], state] 10/23/2025 10/23/2025
BryceBorden,VicePresident
VicePresidentBordenExcavating,inc.

CaiimesaCalifornia
SignatureofBidder Date Date
ShaunBorden,PresidentPrintnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturesofcorporateofficersarerequired.)

Page 91 of 170 ends

16.D.

Page 183 of 593 ends

CONTRACTOR’SREFERENCELISTAttachtothisbidalistofthree(3)projectsinthepastfive(5)yearsonwhichthebidderandhissubcontractor(s)havesuccessfullyconstructedandcompletedprojectswiththesametype(elements),sizeandcomplexityofwork.TheAgencyEngineerwillmakethefinaldeterminationofwhethertheprojectslistedhereareofthesametype,sizeandcomplexityasthisproject.Failureofbiddertosupplysufficientdocumentationofsimilarelectric,telephone,cableandsanitarysewerundergroundfacilitiesexperienceshallbeconsideredgroundsforanon—responsivebidand,attheAgency’sdiscretion,saidbidwillbedisqualified.projectName:ReclaimedWaterline—YucaipaValleyWaterDistrictContractPrice$4,047»l74-00ateofCompletion01/2023Name,Address,andTelephoneNumberofOwner'sRepresentativeMattPorras,YucaipaValleyWaterDistrict,127702ndStreet,Yucaipa,CA92399909-797—5117projectNameRedlandsWaterline—CityofRedlandsContractPrice DateofCompletion06/22Name,Address,andTelephoneNumberofOwner'sRepresentativeGoutamK.Dobey,P.E.909—798-758435CajonSt,Redlands,CA92373 ProjectNameCityofBigBearWaterlineContractPrice:952167347873DateofCompletion11/2022Name,Address,andTelephoneNumberofOwner'sRepresentativeReggieLamson:909-866—505039707BigBearBlvd,BigBearLake,CA92315 (Attachadditionalpagesasnecessary)
$3,555,000.00

Page 92 of 170 ends

16.D.

Page 184 of 593 ends

Jarwélsee—c»-.

DESIGNATIONOFSUBCONTRACTORSNameofSubcontractorDescriptionand DIREmailandLocationofPlacePercentageofSubcontractor’sRegistrationAddressofBusinessWorkLicenseNo.Number6%?@r:3(99.Jme‘ vat—‘ééprLgrip/(:3[/‘7'12m0°“ WCMW»M~sz:/\.SS {52“0P44];-VJASS.COVwaAA—ICAALLAvMUlr—‘w(W A;a— KdeiroQ/MpLQH'OLA/(m?710-!073 “(WuhanwfvmIm Asphallf’a60A4'2H, Ohms?M.éol {:{M’gu2‘43‘40‘4[0&9000celiacrluc.Monrovia—a!(,A 7.69—(ow I (2'.—a—$PF“’- ~ 00009”?' ammowqoccg’0b»: 46%JmWfk-l[/41quI- (Biddertoattachadditionalsheetsifnecessary)(PUBLICCONTRACTCODE§4100ETSEQ.)

Page 93 of 170 ends

16.D.

Page 185 of 593 ends

In“. 'rI- -.I.IJ-IIl-I-I--I'|'I.'I
“mm"?l??u i - -§
'l'lq'm
IIr.-rII-'.I.Il-III-i.-.L-hrI.--I-lI'm-rwd--—f-Il='l'min-. I-Iln'l'J-IIII'I'.I‘II'IIII'II h-Iha. manual-1m'rn'h-n-lIl?uh. -.-—'I--""_I'
u?-. --i-I_-'l 1-
..I.l-".IIImWL‘E-n-
E-nn-Hr-I—III-.----.I-'-—I'-'-'I-II-IIIIH'II
:n—Hrp'r—Hm—W
-I— n. nun-“Pinwh—F-Il-IWIIHII-rlu-l-l '—-'-
TMHIHHL -"- - --"-" "I'-
H‘- __::-:r- I I-IJ'I-I'I'I'IHH"r." r-.I J: I'I.-.-I"-I'3: Ill—I-IH-I'Hh-I-IlHe-I'II—I'I'F-J'I'I-I'I-h'I-Ih'v-—- .II.-m -I_I-' -._-I'l—I-II'I-”Fl—'- —- —I—I-.- {mu-I- -'-"-'-'
r.I.II'II-I-I Elba-Ia I.—.l-"- H'-
‘h-- .II. .n-I'I'I'I-I'ull-I'I'IIIPhil—+-
_—I'-l'f-I-PI
I—?qI-I-I-u?l-H-Th?
3W; .------r—PHI-h—I-.- "whirl-".II."I-III-IIi-I-H-I'IIhlII'I.H-I-I-II'“III-hum"HI.

BIDDERCERTIFICATIONSTOBEEXECUTEDBYALLBIDDERSANDSUBMITTEDWITHBIDTheundersignedBiddercertifiestoOwnerassetforthinsections1through10,belowSTATEMENTOFCONVICTIONSBymysignaturehereunder,Iherebyswear,underpenaltyofperjury,thatnomorethanonefinal,unappealablefindingofcontemptofcourtbyaFederalCourthasbeenissuedagainstBidderwithinthepasttwoyearsbecauseoffailuretocomplywithanorderofaFederalCourtortocomplywithanorderoftheNationalLaborRelationsBoard.CERTIFICATIONOFWORKER'SCOMPENSATIONINSURANCEBymysignaturehereunder,astheContractor,IcertifythatIamawareoftheLaborCodeSection3700,whichrequireseveryemployertobeinsuredagainstliabilityforworker'scompensationortoundertakeself—insuranceinaccordancewiththeprovisionsofthatCode,andIwillcomplywithsuchprovisionsbeforecommencingtheperformanceoftheworkofthisContract.PleasenotethatthesubmittalofthiscertificatedoesnotrelieveContractorfromcomplyingwithalloftheinsurancerequirementsofthePublicWorksAgreementandContractDocuments.CERTIFICATIONOFPREV AILINGW AGERATESANDRECORDSBymysignaturehereunder,astheContractor,IcertifythatIamawareofLaborCodeSection1773,whichrequiresthepaymentofprevailingwageonpublicprojects.ContractorandanysubcontractorsundertheContractorshallcomplywithLaborCodeSection1776regardingwagerecords,andwithLaborCodeSection1777.5regardingtheemploymentandtrainingofapprentices.ContractorisresponsibletoensurecompliancebyanyandallsubcontractorsperformingworkunderthisContract.CERTIFICATIONOFCOMPLIANCEWITHPUBLICWORKSCHAPTEROFLABORCODEBymysignaturehereunder,astheContractor,lcertifythatIamawareofLaborCodeSections1777.1and1777.7Code,andContractorandSubcontractorsareeligibletobidandworkonpublicworksprojects.CERTIFICATIONOFNON-DISCRIMINATIONBymysignaturehereunder,astheContractor,lcertifythattherewillbenodiscriminationinemploymentwithregardtorace,color,religion,gender,sexualorientation,ageornationalorigin;thatallfederal,state,andlocaldirectivesandexecutiveordersregardingnon-discriminationinemploymentwillbecompliedwith;andthattheprincipalofequalopportunityinemploymentwillbedemonstratedpositivelyandaggressively.

Page 94 of 170 ends

16.D.

Page 186 of 593 ends

3% M' rw
Brden
CERTIFICATIONOFNON—DISQUALIFICATIONBymysignaturehereunder,astheContractor,Iswear,underpenaltyofperjury,thatthebelowindicatedBidder,anyofficerofBidder,oranyemployeeofBidderwhohasaproprietaryinterestinsuchBidder,hasneverbeendisqualified,removed,orotherwisepreventedfrombiddingon,orcompletingaFederal,State,orlocalgovernmentprojectbecauseofaviolationoflaworsafetyregulation,exceptasindicatedontheseparatesheetattachedheretoentitled”PreviousDisqualifications."Ifastatementof”PreviousDisqualifications”isattached,pleaseexplainthecircumstances.CERTIFICATIONOFADEQUACYOFCONTRACTAMOUNTBymysignaturehereunder,astheContractor,pursuanttoLaborCodeSection2810(a),certifythat,ifawardedtheContractbasedontheundersigned’sBid,theContractwillincludefundssufficienttoallowtheContractortocomplywithallapplicablelocal,state,andfederallawsorregulationsgoverningthelabororservicestobeprovided.IunderstandthatOwnerwillberelyingonthiscertificationifitawardstheContracttotheundersigned.CERTIFICATIONREGARDINGDIRCONTRACTOR/SUBCONTRACTORREGISTRATIONBymysignaturehereunder,astheContractor,IcertifythatContractor,andalllistedSubcontractorsarethesubjectofcurrentandactivecontractorregistrationspursuanttoDivision2,Part7,Chapter1(commencingwithsection1720)oftheCaliforniaLaborCode.Contractor’sregistrationnumberis[pleasecomplete]1000001975Subcontractors’registrationnumbersareasindicatedinDocument004314.

BIDDER10/23/2025 10/23/2025
ShaunBorden,President Bryce,VicePresidentSignofBidder of Date Printnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturescorporatearerequired.)

Page 95 of 170 ends

16.D.

Page 187 of 593 ends

willnotberesgonsible
Theundersignedherebyproposestofurnishanyandalllabor,materials,andequipmentforthe2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT;ClPNo.2415andappurtenantworkinconnectiontherewith,saidworktobedoneandmaterialstobefurnishedinstrictconformitywiththeContractDocuments,includingbutnotlimitedtotheNoticeInvitingBids,InstructionstoBidders,everyAddendum,plans,specifications,GeneralConditions,SpecialProvisions,GeneralProvisions,Greenbook2024asamendedandsupplemented,technicalreferences,allotherreferenceddocuments,allcodes,permitconditionsandregulations,forthetotalamount(s)andanyunitpricesandadditive/deductiveitemsshownonthisproposal.TheundersignedhasexaminedthelocationoftheproposedworkandalllocalandphysicalconditionsandchallengespresentedbytheProjectsite,isfamiliarwiththeplans,specifications,ContractDocuments(particularlyasdelineatedabove)andtherequirementsofthePublicWorksContract,andalsounderstandsthattheProjectshallbecompletelyconstructedinturn-keyconditionacceptabletotheOwnerwithintheProjecttimerequirementsforthepriceoftheproposal,includingallfeesandsalesand/orusetaxuponanymaterialssofurnished,includinganyunitpricesandadditive/deductiveitems.TheundersignedhasalsocarefullycheckedallofthefiguresgivenandunderstandsthattheAgency foranyerrorsoromissionsonthepartoftheundersignedinsubmittingthisproposal.Contractorconfirmsthathis/her/itsbidissubmittedwithrespecttothechangestotheContractand/orContractDocumentsincludedinalladdendaissuedbytheOwner.Inadditiontoreaffirmingthatthechangesandinformationcontainedintheaddendahavebeenintegratedintotheirproposal,ContractoracknowledgesreceiptofAddendaNo.(s)1and2TheundersignedhasexaminedthecurrentStateofCaliforniascheduleofprevailingwageratesforthetypesofworktobedoneonthisproject(andtheDavis-BaconActiftheAgencyusesfederalfundsfortheProject)andagreestopaynotlessthantheserates.Theundersignedherebyproposestofurnishanyandalllabor,materials,andequipmentforthe2024/2025RAWW ATER— TREATEDW ATERPIPELINEFORTREATMENTPLANT,ClPNo.2415andappurtenantworkinconnectiontherewith,saidworktobedoneandmaterialstobefurnishedinstrictconformitywiththeContractDocuments,includingbutnotlimitedtotheNoticeInvitingBids,InstructionstoBidders,everyAddendum,plans,specifications,GeneralConditions,SpecialProvisions,GeneralProvisions,Greenbook2024asamendedandsupplemented,technicalreferences,allotherreferenceddocuments,allcodes,permitconditionsandregulations,forthetotalamount(s)andanyunitpricesandadditive/deductiveitemsshownonthisproposal.

Page 96 of 170 ends

16.D.

Page 188 of 593 ends

MNa1
1011121314151617181920
DESCRIPTIONMobilizationlDemobilization(nottoexceedSoldTrafficandPedestrianControlWaterQualityControlFieldOrdersTemporaryConstructionProjectIdentificationSianaaeFurnishandInstall8"PVCC-900,(The:9nnWaterMainFurnishandInstall10"PVCC-900,Class200WaterMainFurnishandInstall10"CL52,DJ.WaterMainlineTytonPush-onIAIHI-cFurnishandInstall12"PVCC-900,Class:900WaterMainTrenching,BackfillandRepavingFurnishandInstall6”RSGV .(FLxFL)WIRestrainsFurnishandInstall8"RSGV .(FLGxP_O_\WIRestrainsFurnishandInstall8"TransitionCounlinaFurnishandInstall10"11.25DegreeElbowFurnishandInstall10"45DegreeFIhnwFurnishandInstall10"90DegreeElbowFurnishandInstall10"SteelFlangeFurnishandInstall12"x12"x8"x8"D.l.FlangedCrossFurnishandInstall12"x12"x8“D.l.FlanuedTeeFurnishandInstall12"x12"x6"D.I.

BIDSCHEDULE
ESTIMATEUNITDQUANTITYL81L81L81LS1L81LF200LF2,370
LF75LF550LF3,150EA2EA3EA2EA7EA18EA3EA2EA1EA1EA2

UNITPRICE
$10,000352,500.00
$ 200.00
$ 225.00
$ 1,200.00$ 3,200.00
BASEBID-2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT,CIPNo.2415ITE EXTENDEDITEMAMOUNT $ 64,000.00$ 14,000.00$10,0002,500.00
$ 474,000.00
9,000.00
3,000.00
4,500.002,400.00
7,500.004,400.00
$64,000.0014,000.0014,000.00
180.00
225.00

46.004,500.006,000.001,500.001,500.001,800.001,500.00
7,500.002,200.00
14,000.00
36,000.00
16,875.00123,750.00144,900.00
18,000.00
10,500.0032,400.00
3,200.00

Page 97 of 170 ends

16.D.

Page 189 of 593 ends

2122
ITE
23242526272829303132
33343536373839404142
FurnishandInstall12"RSGV .(FLGxP_O.\WIRestrainsFurnishandInstall12"TransitionCouolino EAEA32 $ 2,800.00
CIPNo.2415ESTIMATEDESCRIPTIONUNITD UNITPRICEmIAMTITVRemoveExistingReducer.FurnishEA1andInstall12”x8”ReducerConstructThrustBlockEA27$ 425.00FurnishandInstall2"AirValveEA2AssemblvFurnishandInstallModified2" EA1RInw—?ffAssemblvFurnishandInstallWaterMainDropEA2FlusherAssemblvFurnishandInstallWaterServiceEA5ConnectionFurnishandInstallWaterMainEA4Suooo?PlugExistingWaterlineEA7 $ 1,200.00SlurryBackfill8"WaterMainandLF390$ 67.00AbandoninPlaceBreakThroughChannelandInsertEA2Pipe,ReconstructChannelWallper“at-"RemoveExistingWaterValveandEA6 $ 230000DelivertoCitvYardRemoveExistingHydrantandFurnishEA2andInstallNewFireHvdrantRemoveandReplaceSidewalkSF390RemoveandReplaceDrivewaySF620AnnrnanhRemoveandReplaceADACurbEA1RamoRemoveandReplaceType"A"CurbLF80 50.00andGIIH’QI‘AdjustWaterValvetoGradeEA1RelocateTrafficControlBoxEA1 $ 3,500.00RemoveExistingWaterMainLF330RemoveandReplaceCrossGutterSF160 50.00TOTALBASEBID(numbers) 5,600.00BASEBID—2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT,EXTENDEDITEMAMnlINT4,200.00$ 11,475.00 5,500.00$ 16,400.00
8,400.00
4,400.00
6,000.004,000.001,200.003,500.00$ 50,160.008,000.00$1,293,970.00 *********5"************************************************************** $
$
7,500.00
4,200.00
9,500.005,500.008,200.005,500.003,200.00
2,200.00
10,100.0028.0028.006,000.00
1,200.00152.00
$ 22,500.00
19,000.00
27,500.0012,800.00
26,130.00
13,800.0020,200.0010,920.0017,360.00

Page 98 of 170 ends

16.D.

Page 190 of 593 ends

Onemillion,twohundredninety-threethousandninehundredBASEBIDTOTAL(inwords) seventy Contractor'sInitialsJ-L-
ADDITIVEABIDITEMSTOTAL(inwords)N/A
Contractor'sInitialsJ-'—-Intheeventofavariationbetweentheunitpriceandextendedtotal,theunitpricewillbeusedandthecorrectedextensionwillbeconsideredastheamountbid.Ifthebidisillegibleandcannotbereconcileditwillbeconsiderednon-responsiveandwillnotbeconsideredforaward.Ifanadditiveand/oralternatebidscheduleiscalledforintheContractDocuments,thelowestbidwillbedeterminedonthebasisofthebasebidschedule(s)onlyunlessotherwisespecifiedintheNoticeInvitingBidsorbyAddendaifissuedtosupersedetheNoticeInvitingBidsonthisspecificissue.ForaContractwhereadeductivebidscheduleiscalledfor,thelowestbidwillbedeterminedbythetotalofallbidschedulesincludingthedeductivebidschedule(s).Regardlessofwhethertheadditive/deductiveoralternatesbiditemswillbeconsideredindeterminingthelowbid,theAgencymayelecttoincludeanyornoneoftheadditive/deductiveoralternatebiditems/schedules,ortootherwiseaddorremovecertainworkfromthescopeofWork.Accordingly,Contractorwarrantsthateachbiditemcontainsaproportionateshareofprofit,overheadandothercostsandexpenses,whichwillbeincurredbytheContractorfortheProject.Ifequallowbidsarereceivedfromresponsibleandresponsivebidderstheselectionshallbemadebydrawinglots,orothersimilarrandomblindmethodselectedbytheAgency.IfonlyoneresponsivebidisreceivedfromaresponsiblebiddertheawardshallnotbemadeunlessthepricecanbedeterminedtobereasonablebasedonananalysisbytheAgency.TheAgency’sdeterminationastothereasonablenessofanysuchbidshallbefinal.TheAgencyreservestherighttorejectanyorallbids,towaiveanyirregularity(ies),andtotakeallbidsunderadvisementforaperiodofsixty(60)calendardaysafterthedatethebidsarepubliclyopened.BidderacknowledgesthatallcostsincurredasaresultofpreparingtheproposalshallbethesoleresponsibilityofBidder.TheNoticeInvitingBidsandInstructionstoBiddersdoesnotcreateorimposeanyobligationupontheAgencytoenterintoacontract.Allbidsreceivedshallberecordedonanabstract(tabulation)ofbids,andthenmadeavailableforpublicinspectionwithintwobusinessdaysofbidopening.

Page 99 of 170 ends

16.D.

Page 191 of 593 ends

Mb)
:2 2‘QQZTm/-0 Mo;whoprovedtomeonthebasisofsatisfactoryeidencetobethepersonwosenameés?s/epe‘subscribedtothewithininstrumentandacknowledgedtomethathe/ It executedthesamehis/pz?thptf’authorizedcapacityupsfandthatbyhis/be?the?signaturejaa’ontheinstrumentthepersonja’f,"ortheentityuponbehalfofwhichthepersonjsj/acted.executedtheinstrument.

ACKNOWLEDGMENT
Anotarypublicorotherof?cercompletingthiscertificateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscertificateisattached,andnotthetruthfulness,accuracy,orvalidityofthatdocument.StateofCarnIaCountyof On 5beforemeValenciaDixon,NotaryPublic(insertnameandtitleoftheofficer)personallyappeared in IcertifyunderPENALTYOFPERJURYunderthelawsoftheStateofCaliforniathattheforegoingparagraphistrueandcorrect.

WITNESSmyhandandofficialseal
Signature (Seal)
V ALENCIADIXONCommlnlonI2602048NotaryPublic-cIi'omhOnngcCountyComm.OCTOBER14,2028

Page 100 of 170 ends

16.D.

Page 192 of 593 ends

sgecialgitems
Thequantitieslistedinthebidproposalareprovidedtogiveageneralindicationofthescopeoftheworkandforthecomparisonofbids.Nowarrantyismade,eitherexpressedorimplied,thattheactualquantitiesofworktobedonewillcorrespondtherewith.Itemnumbersfollowedby”(S)"aredesignatedas whichwillnotbeincludedtowardsthecalculationofminimumof50percentofworktobeperformedbyContractor’sownforces.BysigningandsubmittingthisbidtheContractorconfirmsthattheyarefamiliarwiththeworksiteandallexistingconditionsthatmayaffecttheirworkandthattheyhavereadandagreetoalltheterms,conditionsandrequirementscontainedorreferencedhereinorintheContractDocumentsandthatalltheaforementionedhasbeenincludedinthebidpriceslistedabove,includingitemsofworkthatmaynothaveaspecificpaylineitemandthatthereshallbenoadditionalcoststotheAgency.W ARNING:IfanaddendumoraddendahavebeenissuedbytheAgencyandnotnotedaboveasbeingreceivedbythebidder,thisBidmayberejected.

Page 101 of 170 ends

16.D.

Page 193 of 593 ends

10-26;25
natu
Lopez:identTreasu,Secretary
CERTIFICATEREGARDINGCONTRACTOR'SLICENSE1.ContractorisrequiredtopossessoneofthefollowingStateContractor'sLicense:StateofCaliforniaClass'A’Contractor’sLicenseCombinationofSpecialtyClass’C’Contractor'sLicenses2.Afailureto(1)possesstherequiredlicense,(2)truthfullysetforththefollowinginformation,and/or(3)executethisCertificatemayrendertheproposalnonresponsiveandpermittheCitytorejecttheproposal.(BusinessandProfessionsCodeSection7028.15)3.Contractordeclares,underpenaltyofperjury,thathe/she/itpossessestherequiredContractor'slicense(s)which:a.Bearsthelicensenumberls):1123849b.Expireson:7-30-28 SigreofBidder DateSignatureofBidder Date
JesusPresrerPrintnameandtitle Printnameandtitle(IftheBidderisacorporationtwosignaturesofcorporateofficersarerequired.) ThisrequiredlicensedeterminationhasbeenmadebytheAgency.AnyContractorholdingadifferentlicensewhofeelsheisqualifiedtobidonthisworkmustsoadvisetheAgencyatleastseven(7)dayspriortothebidopening.TheAgencymayconductareviewofthecontemplatedworktore—evaluatetherequiredlicensedetermination.TheAgencymayinitssolediscretionmaintainorchangetherequiredlicensedetermination;Agency’sdecisionastotherequiredbefinal.

Page 102 of 170 ends

16.D.

Page 194 of 593 ends

Corporation
JesusLopez:PresidentTreasurer.Secreta
Completethefollowing:Q&EPipelineCompanyDIR:2000002511LlC#:1123849Legalnameofthebusiness,DIRReg.andContractorLicenseNos.

BusinessType(Corporation,Partnership,SoleProprietor)N/ADBA(ifany)JesusLopez:President,Treasurer,SecretaryNameandtitleoftheownerN/ANameandtitleofsecondpartnerorof?cer2235MarquetteAve,PomonaCA91766BusinessAddress(909)706-8286TelephonenumberN/AFacsimilenumber JesusLopez;jesuslopez@qepipelinecompany.comNameandEmailaddressofprimarycontactN/ACompanywebaddress 10—26-25Bidder DateSignatureofBidder DateryPrintnameandtitle Printnameandtitle(IftheBidderisacorporationtwosignaturesofcorporateofficersarerequired.)

Page 103 of 170 ends

16.D.

Page 195 of 593 ends

personallyappeared A w
whoprovedtomeonthebestsofsatisfactoryevtdencetobetheperson?whosenamea‘)’subscribedtothewithinInstrumentandacknowledgedtomethathelshgttye’yexecutedthehis/Mltnpfrauthorizedcapacttyuagjandthatbyhts/M/tbe?Signaturem’onthemstrumenperson?ortheentltyuponbehalfofWthhthepersonMactedexecutedtheInstrument

ACKNOWLEDGMENT
Anotarypublicorotherof?cercompletingthiscertificateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscertificateisattached,andnotthetruthfulness,accuracy,orvalidofthatdocumentStateofCalilaCountyof On “‘ beforemeValenciaDixon,NotaryPublic(insertnameandtitleoftheofficer) is/Msameintthe
lcertifyunderPENALTYOFPERJURYunderthelawsoftheStateofCaliforniathattheforegorngparagraphistrueandcorrect WITNESSmyhandandofficialseal
Signature (Seal)
V ALENCIADIXONCommlsslonI26020“NotaryPublic-CulllomllOrangeCountyMyCommOCTOBER202

Page 104 of 170 ends

16.D.

Page 196 of 593 ends

10%ofAmountBid
BondNo.T325-443
BIDSECURITYFORMFORBONDKNOWALLBYTHESEPRESENTS:ThattheundersignedQ&EPipelineCompany(NameofContractor)asPrincipalandtheundersignedasSuretyareheldandfirmlybounduntoOwner,CITYOFHEMET,apoliticalsubdivisionoftheStateofCalifornia,asobligee,inthepenalsumof(MAmountInWordslTenPercentofAmountBidDollars(S )lawfulmoneyoftheUnitedStatesofAmericabeingatleasttenpercent(10%)oftheaggregateamountofsaidPrincipal’sbaseBid,forthepaymentofwhich,wellandtrulytobemade,webindourselves,oursuccessors,executors,administrators,andassigns,jointlyandseverally,firmlybythesepresents.WHEREAS,saidPrincipalissubmittingaBidfor2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT,2415THECONDITIONOFTHISOBLIGATIONISSUCHthatiftheBidsubmittedbythesaidPrincipalbeacceptedandtheContractbeawardedtosaidPrincipalandsaidPrincipalshallwithintherequiredperiodsenterintotheContractsoawardedandprovidetherequiredConstructionPerformanceBond,ConstructionLaborandMaterialPaymentBond,insurancecertificates,andallotherendorsements,forms,anddocumentsrequiredundertheInstructionstoBidders,thenthisobligationshallbevoid,otherwisetoremaininfullforceandeffect.INWITNESSWHEREOF,theaboveboundenpartieshaveexecutedthisinstrumentthis24thdayofOctober2025.(Month)Q&EPipelineCompany (CorporateSeal) BypalBy utua
(CorporateSeal) ByKerissaRicciardi,Attorney-in-Fact

Page 105 of 170 ends

16.D.

Page 197 of 593 ends

MWWEWM
,J?i
i, m, ",7 7
iJ#:910ng>
.DLMQLl??,
Tea»[egg2:315:15~sfactmy

ACKNOWLEDGMENT
Anotarypublicorotherofficercompletingthiscertificateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscertificateisattached,andnotthetruthfulness,accuracy‘orvalidofthatdocumentStateofCalifoaCountyof 0n *" beforeme.ValenciaDixon,NotaryPublic(insertnameandtitleoftheofficer)personallyappearedwhoprovedtomeonthebasisofsatievidencetobethepe whosenamejzfis/subscribedtothewithininstrumentandacknowledgedtomethath executedthesameinhis/bef/thérauthorizedcapacity?es’liandthatbyhis/be?tl'?frsignature(§¥ontheinstrumentthepersoruzfortheentityuponbehalfofwhichthepersonMacted,executedtheinstrumentIcertifyunderPENALTYOFPERJURYunderthelawsoftheStateofCaliforniathattheforegoingparagraphistrueandcorrect WlTNESSmyhandandofficialseal
Signature (Seal)
V ALENCIADIXONCQMMIqunI25010“MauryPubllc-cllfomhOnnuoCountyComm.ExpiresOCTOBER202

Page 106 of 170 ends

16.D.

Page 198 of 593 ends

coma.in2529317normPUBLIC-CALIFORNIAORANGECOUNTYu.

ACKNOWLEDGMENT
Anotarypublicorotherofficercompletingthiscertificateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscertificateisattached,andnotthetruthfulness,accuracy,orvalidityofthatdocument.StateofCaliforniaCountyof OrangeJeremyBush,NotaryPublic(insertnameandtitleoftheofficer)On beforeme, personallyappearedKerlssaRICCIardIwhoprovedtomeonthebasisofsatisfactoryevidencetobetheperson(s)whosename(s)is/aresubscribedtothewithininstrumentandacknowledgedtomethathe/she/theyexecutedthesameinhis/her/theirauthorizedcapacity(ies),andthatbyhis/her/theirsignature(s)ontheinstrumenttheperson(s),ortheentityuponbehalfofwhichtheperson(s)acted,executedtheinstrument.IcertifyunderPENALTYOFPERJURYunderthelawsoftheStateofCaliforniathattheforegoingparagraphistrueandcorrect.

WITNESSmyhandandofficialseal
2388Signature (Seal)MYCOMMIXPJUG2029

Page 107 of 170 ends

16.D.

Page 199 of 593 ends

MERCHAN?
sined Compa'by rsspsclivecams
SBONDINGCOMPANYWPOWEROFATTORNEYKnowAllPersonsByThesePresents,thatMERCHANTSBONDINGCOMPANY(MUTUAL)andMERCHANTSNATIONALBONDING,|NC.,bothbeingcorporationsoftheStateofIowa,andMERCHANTSNATIONALINDEMNITYCOMPANY,anassumednameofMerchantsNationalBonding,Inc.,(hereincollectivelycalledthe“Companies")doherebymake,constituteandappoint,individually,CharoJRosemond;JamesBaldassare;JohnFSurano;KerissaRicciardi;KristaADiMezza;LisaMScavetta:MichaelCastaneda;MichaelDugan;SherryanneMDePirro theirtrueandlawfulAttorney(s)—in-Fact,tosignitsnameassurety(ies)andtoexecute,sealandacknowledgeanyandallbonds,undertakings,contractsandotherwritteninstrumentsinthenaturethereof,onbehalfoftheCompaniesintheirbusinessofguaranteeingthe?delityofpersons,guaranteeingtheperformanceofcontractsandexecutingorguaranteeingbondsandundertakingsrequiredorpermittedinanyactionsorproceedingsallowedbylaw.ThisPower-of—AttorneyisgrantedandissignedandsealedbyfacsimileunderandbyauthorityoftheBy-LawsadoptedbytheBoardofDirectorsoftheCompanies."ThePresident,Secretary,Treasurer,oranyAssistantTreasureroranyAssistantSecretaryoranyVicePresidentshallhavepowerandauthoritytoappointAttorneys-in-Fact,andtoauthorizethemtoexecuteonbehalfoftheCompany,andattachthesealoftheCompanythereto,bondsandundertakings,recognizances,contractsofindemnityandotherwritingsobligatoryinthenaturethereof."“Thesignatureofanyauthorizedof?cerandthesealoftheCompanymaybeaf?xedbyfacsimileorelectronictransmissiontoanyPowerofAttorneyorCerti?cationthereofauthorizingtheexecutionanddeliveryofanybond,undertaking,recognizance,orothersuretyshipoobligationsoftheCompany,andsuchsignatureandsealwhensousedshallhavethesameforceandeffectasthoughmanually?xed."InconnectionwithobligationsinfavoroftheFloridaDepartmentofTransportationonly,itisagreedthatthepowerandauthorityherebygiventotheAttorney-in-Factincludesanyandallconsentsforthereleaseofretainedpercentagesand/or?nalestimatesonengineeringandconstructioncontractsrequiredbytheStateofFloridaDepartmentofTransportation.ItisfullyunderstoodthatconsentingtotheStateofFloridaDepartmentofTransportationmakingpaymentofthe?nalestimatetotheContractorand/oritsassignee,shallnotrelievethissuretycompanyofanyofitsobligationsunderitsbond.InconnectionwithobligationsinfavoroftheKentuckyDepartmentofHighwaysonly,itisagreedthatthepowerandauthorityherebygiventotheAttorney-in-Factcannotbemodi?edorrevokedunlesspriorwrittenpersonalnoticeofsuchintenthasbeengiventotheCommissioner- DepartmentofHighwaysoftheCommonwealthofKentuckyatleastthirty(30)dayspriortothemodi?cationorrevocation.InWitnessWhereof,theCompanieshavecausedthisinstrumenttobesignedandsealedthis2Mdayof June,2025N c"I .‘.MERCHANTSBONDINGCOMPANY(MUTUAL). ‘.MERCHANTSNATIONALBONDING,INC.: .‘MERCHANTSNATIONALINDEMNITYCOMPANYE:' -o- .'2003"'z_ - 7‘...By. o~...-I-‘STATEOFIOW ACOUNTYOFDALLAS55.Onthis2nddayof June2025,beforemeappearedLarryTaylor,tomepersonallyknown,whobeingbymedulysworndidsaythatheisPresidentofMERCHANTSBONDINGCOMPANY(MUTUAL),MERCHANTSNATIONALBONDING.INC.,andMERCHANTSNATIONALINDEMNITYCOMPANY;andthatthesealsaf?xedtotheforegoinginstrumentaretheCorporateSealsoftheCompanies;andthatthesaidinstrumentwasandsealedinbehalfofthe authorityoftheir ofDirectors.PenniMillerCommissionNumber787952MyCommissionExpiresJanuary20,2027(Expirationofnotary'scommissionNotaryPUbI'cdoesnotinvalidatethisinstrument)I,ElisabethSandersfeld,SecretaryofMERCHANTSBONDINGCOMPANY(MUTUAL),MERCHANTSNATIONALBONDING,INC.,andMERCHANTSNATIONALINDEMNITYCOMPANYdoherebycertifythattheaboveandforegoingisatrueandcorrectcopyofthePOWER-OF-A'I'I'ORNEYexecutedbysaidCompanies,whichisstillinfullforceandeffectandhasnotbeenamendedorrevoked.InWitnessWhereof,Ihavehereuntosetmyhandandaf?xedthesealoftheCompaniesonthis24thdayofOctober.2025o o“o.0. O .'4‘2 ‘
I lO .OO O.o..-.‘vPOA0018(5/25)
President
nles
Secretary

Page 108 of 170 ends

16.D.

Page 200 of 593 ends

[
NON-COLLUSIONAFFIDA VITPUBLICCONTRACTCODESECTION7106NON-COLLUSIONDECLARATIONTOBEEXECUTEDBYBIDDERANDSUBMITTEDWITHBIDTheundersigneddeclares:IamthePresident,Treasurer,SecretaryofQ&EPipelineCompany' thepartymakingtheforegoingbid.Thebidisnotmadeintheinterestof,oronbehalfof,anyundisclosedperson,partnership,company,association,organization,orcorporation.Thebidisgenuineandnotcollusiveorsham.Thebidderhasnotdirectlyorindirectlyinducedorsolicitedanyotherbiddertoputinafalseorshambid.Thebidderhasnotinanymanner,directlyorindirectly,soughtbyagreement,communication,orconferencewithanyonetofixthebidpriceofthebidderoranyotherbidder,ortofixanyoverhead,profit,orcostelementofthebidprice,orofthatofanyotherbidder.Allstatementscontainedinthebidaretrue.Thebidderhasnot,directlyorindirectly,submittedhisorherbidpriceoranybreakdownthereof,orthecontentsthereof,ordivulgedinformationordatarelativethereto,toanycorporation,partnership,company,association,organization,biddepository,ortoanymemberoragentthereof,toeffectuateacollusiveorshambid,andhasnotpaid,andwillnotpay,anypersonorentityforsuchpurpose.Anypersonexecutingthisdeclarationonbehalfofabidderthatisacorporation,partnership,jointventure,limitedliabilitycompany,limitedliabilitypartnership,oranyotherentity,herebyrepresentsthatheorshehasfullpowertoexecute,anddoesexecute,thisdeclarationonbehalfofthebidder.IdeclareunderpenaltyofperjuryunderthelawsoftheStateofCaliforniathattheforegoingistrueandcorrectandthatthisdeclarationisexecutedon date],atcity], [state]. reBidder DateSignatureofBidder DateJesusLopez:President,Treasurer,SecretaryPrintnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturesofcorporateof?cersarerequired.)

Page 109 of 170 ends

16.D.

Page 201 of 593 ends

LIM'Co??g?$369?
Calicm0
ubscribeda to(oraf? eforeML. 205, can
Anotarypublicorotherof?cercompletingthiscerti?cateveri?esonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscerti?cateisattached,andnotthetruthfulness,accuracy,orvalidityofthatdocument.Stateof iaCountyof8 ndswornrmedmonthis36"dayof by _.——.- provedtomeonthebasisofsatisfactoryevidencetobetheperson?’)’whoappearedbeforeme. (Seal) Signature
V ALENCIADIXONCommlulonI260204!NotaryPublic-CllllornhOrangeCountyMyComm.ExpiresOCTOBER14,2026

Page 110 of 170 ends

16.D.

Page 202 of 593 ends

(5
BIDSECURITYFORMFORCHECKNOTE:THEFOLLOWINGFORMSHALLBEUSEDINTHECASEOFCHECKACCOMPANYINGBIDAccompanyingthisproposalisaCertifiedCheckorCashier’sCheckpayabletotheorderoftheCityofHemet,hereinafterreferredtoas"Agency",forMA dollarsN/A thisamountbeing10percent(10%)ofthetotalamountofthebid.Thischeckshallbereturnedtotheundersignedonlyifeitherofthefollowingoccurs:

A.IfsaidBidshallberejectedbytheAgency;B lfsaidBidshallbeacceptedbytheAgencyandtheUndersignedshallexecuteanddeliveraContractintheformattachedhereto(properlycompletedinaccordancewithsaidBid)andshallfurnishbondsrequiredforhis/her/itsfaithfulperformanceofsaidContractandforthepaymentofallpersonsperforminglabororfurnishingmaterialsinconnectiontherewith,andshallinallotherrespectsperformtheContractcreatedbyacceptanceofsaidBid.Otherwise,saidcheckshallbecomethepropertyoftheAgencySaidcheckshallalsobecomethepropertyoftheAgencyiftheUndersignedshallwithdrawhis/her/itsbidwithintheperiodofsixty(60)calendardaysafterthedatesetfortheopeningthereof,unlessotherwiserequiredbylaw,andnotwithstandingtheawardoftheContracttoanotherbidder.

SignatureofBidder DateSignatureofBidder Date
Printnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturescorporatearerequired.)

Page 111 of 170 ends

16.D.

Page 203 of 593 ends

(9.0.9)437-8440
CONTRACTOR’SREFERENCELISTAttachtothisbidalistofthree(3)projectsinthepastfive(5)yearsonwhichthebidderandhissubcontractor(s)havesuccessfullyconstructedandcompletedprojectswiththesametype(elements),sizeandcomplexityofwork.TheAgencyEngineerwillmakethefinaldeterminationofwhethertheprojectslistedhereareofthesametype,sizeandcomplexityasthisproject.Failureofbiddertosupplysufficientdocumentationofsimilarelectric,telephone,cableandsanitarysewerundergroundfacilitiesexperienceshallbeconsideredgroundsforanon—responsivebidand,attheAgency’sdiscretion,saidbidwillbedisqualified.projectNameCaliforniaStnewreclaimedwaterContractPrice:$630,000-00DateofCompletion:Name,Address,andTelephoneNumberofOwner'sRepresentative:DanielMarburger-CityofRedlands ProjectName:RawwaterservicereplacementsContractPrice:$124,000-00DateofCompletionName,Address,andTelephoneNumberofOwner'sRepresentativeKenyonPotter-CityofBeaumont(760)641-8830ProjectNameNewstormdrainretentionbasinandcatchbasinsContractPrice:$214,000-00DateofCompletion:Name,Address,andTelephoneNumberofOwner'sRepresentative:SamChacon-CitvofRiverside(951)548—4400 (Attachadditionalpagesasnecessary)
9-19-2025
7-30—2025
5-30-2025

Page 112 of 170 ends

16.D.

Page 204 of 593 ends

6839
11—19-2021
water
CONTRACTOR’SREFERENCELISTAttachtothisbidalistofthree(3)projectsinthepastfive(5)yearsonwhichthebidderandhissubcontractor(s)havesuccessfullyconstructedandcompletedprojectswiththesametype(elements),sizeandcomplexityofwork.TheAgencyEngineerwillmakethefinaldeterminationofwhethertheprojectslistedhereareofthesametype,sizeandcomplexityasthisproject.Failureofbiddertosupplysufficientdocumentationofsimilarelectric,telephone,cableandsanitarysewerundergroundfacilitiesexperienceshallbeconsideredgroundsforanon-responsivebidand,attheAgency’sdiscretion,saidbidwillbedisqualified.ProjectNameKaiserofPasadenaWater,SD,andSewerrelocationsContractPrice:3.5M DateofCompletion:2‘19-2021Name,Address,andTelephoneNumberofOwner'sRepresentative:JustinChana.2860MichelleDr.Suite110.lrvineCA92606(213)607-ProjectName:CitvofHopeNewParkinoStructurewatermainandstormdrainlinesContractPrice:2.75M DateofCompletion:Name,Address,andTelephoneNumberofOwner'sRepresentativeKeithWebber,515SFlowerSt.Suite3600LosAngeles,CA90071(424)275-5857ProjectNameRanchLotStudiosBurbank.Newlines.stormdrainandsewerlinesContractPrice:8-75M DateofCompletion:11-6-2023Name,Address,andTelephoneNumberofOwner'sRepresentative:OscarZavala.1605OceanFrontWalk,SantaMonica.CA90401(951)437-3680 (Attachadditionalpagesasnecessary)

Page 113 of 170 ends

16.D.

Page 205 of 593 ends

N/
DESIGNATIONOFSUBCONTRACTORSNameofSubcontractorDescriptionand DIREmailandLocationofPlacePercentageofSubcontractor’5RegistrationAddressofBusinessWorkLicenseNo.Number (Biddertoattachadditionalsheetsifnecessary)(PUBLICCONTRACTCODE§4100ETSEQ.)

Page 114 of 170 ends

16.D.

Page 206 of 593 ends

rm
.ll-Li-Jll-‘I'u?.' -'|-I"I
?m-qw??n'r-m
LuW?.—Fw-r?llw-?'r-h. lam-In...“
:-l' IhHt-Iild?-I'IHI
-I-Fl'__H-I“
ll-I-I
“I:"-rElT-l-II-vita-nqI-I-I-III'I'II-I-JI:

III-?ll'l?-Lbh-FI-H-un-lJr-r--H-I-I.
r— ”Wk-hIJ-lH-l-l-l-II'I-I-n MP.“hi.II'HH-Imul'hHII' -I'l'l-'—HI'.II'I-. Lr-l-I?-I'I-ubi- ?-adl I'I-l n'I'J'I'I-m-lI-H' lrh-H- f-‘I'u'lu'I'f—IIH-l':-.--r_- lm— r‘n-l"Had—1;“rn— lq-JI-I—I—‘fl-Hh'I'I-l'l'-'l'-'I ill-.f‘I-IJ-IIIII—II'II-.—I-Ih-..”.::.':'::~;:.:':i.:i..w:a::
'IH-l-HHgrin-rim
WI.”mlhl—I... -I-r-.-I-I
I'cl'Hfl—lu'lhim-I'll:"?-rim-.1"?h—i H
BIDDERCERTIFICATIONSTOBEEXECUTEDBYALLBIDDERSANDSUBMITTEDWITHBIDTheundersignedBiddercertifiestoOwnerassetforthinsections1through10,belowSTATEMENTOFCONVICTIONSBymysignaturehereunder,Iherebyswear,underpenaltyofperjury,thatnomorethanonefinal,unappealablefindingofcontemptofcourtbyaFederalCourthasbeenissuedagainstBidderwithinthepasttwoyearsbecauseoffailuretocomplywithanorderofaFederalCourtortocomplywithanorderoftheNationalLaborRelationsBoard.CERTIFICATIONOFWORKER'SCOMPENSATIONINSURANCEBymysignaturehereunder,astheContractor,IcertifythatIamawareoftheLaborCodeSection3700,whichrequireseveryemployertobeinsuredagainstliabilityforworker'scompensationortoundertakeself—insuranceinaccordancewiththeprovisionsofthatCode,andIwillcomplywithsuchprovisionsbeforecommencingtheperformanceoftheworkofthisContract.PleasenotethatthesubmittalofthiscertificatedoesnotrelieveContractorfromcomplyingwithalloftheinsurancerequirementsofthePublicWorksAgreementandContractDocuments.CERTIFICATIONOFPREV AILINGW AGERATESANDRECORDSBymysignaturehereunder,astheContractor,IcertifythatIamawareofLaborCodeSection1773,whichrequiresthepaymentofprevailingwageonpublicprojects.ContractorandanysubcontractorsundertheContractorshallcomplywithLaborCodeSection1776regardingwagerecords,andwithLaborCodeSection1777.5regardingtheemploymentandtrainingofapprentices.ContractorisresponsibletoensurecompliancebyanyandallsubcontractorsperformingworkunderthisContract.CERTIFICATIONOFCOMPLIANCEWITHPUBLICWORKSCHAPTEROFLABORCODEBymysignaturehereunder,astheContractor,IcertifythatIamawareofLaborCodeSections1777.1and1777.7Code,andContractorandSubcontractorsareeligibletobidandworkonpublicworksprojects.CERTIFICATIONOFNON-DISCRIMINATIONBymysignaturehereunder,astheContractor,Icertifythattherewillbenodiscriminationinemploymentwithregardtorace,color,religion,gender,sexualorientation,ageornationalorigin;thatallfederal,state,andlocaldirectivesandexecutiveordersregardingnon—discriminationinemploymentwillbecompliedwith;andthattheprincipalofequalopportunityinemploymentwillbedemonstratedpositivelyandaggressively.

Page 115 of 170 ends

16.D.

Page 207 of 593 ends

,Secretary
CERTIFICATIONOFNON-DISQUALIFICATIONBymysignaturehereunder,astheContractor,Iswear,underpenaltyofperjury,thatthebelowindicatedBidder,anyofficerofBidder,oranyemployeeofBidderwhohasaproprietaryinterestinsuchBidder,hasneverbeendisqualified,removed,orotherwisepreventedfrombiddingon,orcompletingaFederal,State,orlocalgovernmentprojectbecauseofaviolationoflaworsafetyregulation,exceptasindicatedontheseparatesheetattachedheretoentitled”PreviousDisqualifications."Ifastatementof”PreviousDisqualifications"isattached,pleaseexplainthecircumstances.CERTIFICATIONOFADEQUACYOFCONTRACTAMOUNTBymysignaturehereunder,astheContractor,pursuanttoLaborCodeSection2810(a),Icertifythat,ifawardedtheContractbasedontheundersigned’sBid,theContractwillincludefundssufficienttoallowtheContractortocomplywithallapplicablelocal,state,andfederallawsorregulationsgoverningthelabororservicestobeprovided.IunderstandthatOwnerwillberelyingonthiscertificationifitawardstheContracttotheundersigned.CERTIFICATIONREGARDINGDIRCONTRACTOR/SUBCONTRACTORREGISTRATIONBymysignaturehereunder,astheContractor,IcertifythatContractor,andalllistedSubcontractorsarethesubjectofcurrentandactivecontractorregistrationspursuanttoDivision2,Part7,Chapter1(commencingwithsection1720)oftheCaliforniaLaborCode.Contractor’sregistrationnumberis[pleasecomplete]2000002511 Subcontractors’registrationnumbersareasindicatedinDocument004314.

BIDDER 10-26-25atofBidder DateSignatureofBidder Date
JesusLopez:President,TreasurerPrintnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturesofcorporateo?‘icersarerequired.)

Page 116 of 170 ends

16.D.

Page 208 of 593 ends

certi?catewho
vaity
iforniaLo;Aggdgges
ribedandswornt onthis&’%m M
E
\notarypublicorotherof?cercompletingthisveri?esonlytheidentityoftheindividualsignedthedocumenttowhichthiscerti?cateisattached,andnotthetruthfulness,accuracy,orlidofthatdocument.StateofCalCountyofSubsc 0(oraf?rmed)beforemedayof 203:,byprovedtomeonthebasisofsatisfactoryevidencetobethepersonjs’)’whoappearedbeforeme. (Seal) Signature
V ALENCIADIXONCommlulon82502048NotaryPublic-CalllomhOrangeCountyComm.ExpmsOCTOBER14,2028

Page 117 of 170 ends

16.D.

Page 209 of 593 ends

2024/2025ATER— TR W ATERPIPE RTREATMPLANT.

CITYOFHEMETNOTICEINVITINGBIDSRAWW EATEDLINEFO ENTCIPNo.2415 PUBLICNOTICEISHEREBYGIVENthattheCityofHemethereinafterreferredtoastheAgency,invitessealedbidsfortheabovestatedProjectandwillreceivesuchbidsintheofficesoftheAgency,atthePurchasingOffice,445EastFloridaAvenue,Hemet,CA92543uptothetimeof3:00p.m.,onThursdayOctober23,2025atwhichtimetheywillbepubliclyopenedatCityHallat445E.FloridaAvenue.Bidsreceivedafterthetimeanddateforthebidopeningwillnotbeacceptedandshallbereturnedunopened.TheworktobedoneisdescribedintheseBidandContractDocumentsfortheabovestatedProject.ThegeneralScopeofWorkisasfollows:DESCRIPTIONOFWORKThescopeofworkgenerallyconsistsof,butisnotlimitedtothefurnishingandinstallationof8",10”and12"watermain,allappuratecesandfittings,trenching,backfill,repaving,replacementofcurbramp,drivewaysandcurbandgutter,breakingthroughtheexistingconcretechannel,installinganoverheadpipelinealongthebridgeoverthechannel,andallotherworknecessaryforthecompletionofthisproject.LOCATIONOFWORKTheworktobeconstructedislocatedonthefollowinglocationsKirbyStfromStetsonAvetoJohnstonAve-JohnstonAvefromKirbySttoMercedWayGENERALlnconformancewithStateofCaliforniaAssemblyBill2036completebidsetswillbeavailableelectronically,atnocost,attheCityofHemetBidPage.itshallbetheresponsibilityoftheprospectivebidderstodownloadandprintthebiddocumentsforreviewandbidpreparation,aswellastoobtainanyaddendumsandresponsestopre-bidrequestsforclarificationthathavebeenprovidedbytheAgency.Biddersshallalsocheckthewebsiteforaddendumswhichwillbepostednolaterthan72hourspriortothebidopening.Eachaddendumwillincludeaconformationsheetindicatingreceiptoftheaddendum.Thissheetmustbesignedandincluded

Page 118 of 170 ends

16.D.

Page 210 of 593 ends

willnotberesponsible
ratedintotheirproposLIL;AIS-x
Theundersignedherebyproposestofurnishanyandalllabor,materials,andequipmentforthe2024/2025RAWW ATER— TREATEDW ATERPIPELINEFORTREATMENTPLANT;CIPNo.2415andappurtenantworkinconnectiontherewith,saidworktobedoneandmaterialstobefurnishedinstrictconformitywiththeContractDocuments,includingbutnotlimitedtotheNoticeInvitingBids,InstructionstoBidders,everyAddendum,plans,specifications,GeneralConditions,SpecialProvisions,GeneralProvisions,Greenbook2024asamendedandsupplemented,technicalreferences,allotherreferenceddocuments,allcodes,permitconditionsandregulations,forthetotalamount(s)andanyunitpricesandadditive/deductiveitemsshownonthisproposal.TheundersignedhasexaminedthelocationoftheproposedworkandalllocalandphysicalconditionsandchallengespresentedbytheProjectsite,isfamiliarwiththeplans,specifications,ContractDocuments(particularlyasdelineatedabove)andtherequirementsofthePublicWorksContract,andalsounderstandsthattheProjectshallbecompletelyconstructedinturn-keyconditionacceptabletotheOwnerwithintheProjecttimerequirementsforthepriceoftheproposal,includingallfeesandsalesand/orusetaxuponanymaterialssofurnished,includinganyunitpricesandadditive/deductiveitems.TheundersignedhasalsocarefullycheckedallofthefiguresgivenandunderstandsthattheAgency foranyerrorsoromissionsonthepartoftheundersignedinsubmittingthisproposal.Contractorconfirmsthathis/her/itsbidissubmittedwithrespecttothechangestotheContractand/orContractDocumentsincludedinalladdendaissuedbytheOwner.Inadditiontoreaffirmingthatthechangesandinformationcontainedintheaddendahavebeeninteg al,ContractoracknowledgesreceiptofAddendaNo.(sTheundersignedhasexaminedthecurrentStateofCaliforniascheduleofprevailingwageratesforthetypesofworktobedoneonthisproject(andtheDavis—BaconActiftheAgencyusesfederalfundsfortheProject)andagreestopaynotlessthantheserates.Theundersignedherebyproposestofurnishanyandalllabor,materials,andequipmentforthe2024/2025RAWW ATER— TREATEDW ATERPIPELINEFORTREATMENTPLANT,CIPNo.2415andappurtenantworkinconnectiontherewith,saidworktobedoneandmaterialstobefurnishedinstrictconformitywiththeContractDocuments,includingbutnotlimitedtotheNoticeInvitingBids,InstructionstoBidders,everyAddendum,plans,specifications,GeneralConditions,SpecialProvisions,GeneralProvisions,Greenbook2024asamendedandsupplemented,technicalreferences,allotherreferenceddocuments,allcodes,permitconditionsandregulations,forthetotalamount(s)andanyunitpricesandadditive/deductiveitemsshownonthisproposal.

Page 119 of 170 ends

16.D.

Page 211 of 593 ends

BIDSCHEDULEBASEBID-2024/2025RAWW ATER-TREATEDW ATERPIPELINEFORTREATMENTPLANT, ITEMNo
O'l-0')
10111213141516171819202122
CIPNo.2415DESCRIPTIONUNITMobilizationIDemobilization(nottoL8exceed5%)TrafficandPedestrianControlLSWaterQualityControlL8FieldOrdersLSTemporaryConstructionProjectLSIdentificationSignageFurnishandInstall8"PVCC-900,LFClass200WaterMainFurnishandInstall10"PVCC-900,LFClass200WaterMainFurnishandInstall10"CL52,DJ.WaterMainlineTytonPush-onLFJointsFurnishandInstall12"PVC0-900,LFClass200WaterMainTrenching,BackfillandRepavingLFFurnishandInstall6”RSGV .(FLxFL)WIRestrainsEAFurnishandInstall8"RSGV .(FLGxEAP.O.)WIRestrainsFurnishandInstall8"Transition. EACoupllngFurnishandInstall10"11.25DegreeEAElbowFurnishandInstall10"45DegreeEAElbowFurnishandInstall10"90DegreeEAElbowFurnishandInstall10"SteelFlangeEAFurnishandInstall12"x12"x8"x8"D.I.FlangedCrossEAFurnishandInstall12"x12"x8"D.lEAFlangedTeeFurnishandInstall12"x12"x6"D.l.EAFlangedTeeFurnishandInstall12"RSGV .(FLGEAxP.O.)WIRestrainsFurnishandInstall12"TransitionEACoupling

ESTIMATEDQUANTITY
AAA—‘4
2002,370755503,150

UNITPRICE
$55,000.00$35,000.00$4,500.00$10,000.00$2,500.00$155.00$185.00$195.00 $200.00$40.00$3,750.00$4,950.00$1,500.00$2,250.00$2,750.00$2,750.00$1,500.00$5,500.00$7,000.00$2,750.00$8,000.00$2,000.00 EXTENDEDITEMAMOUNT$55,000.00$35,000.00$4500.00$10.000.00$2,500.00$31,000.00$438,450.00$14,625.00 $110,000.00$126,000.00$7,500.00$14,850.00$3,000.00$15,750.00$49,500.00$8,250.00$3,000.00$5,500.00$7,000.00$5,500.00$24,000.00$4,000.00

Page 120 of 170 ends

16.D.

Page 212 of 593 ends

bw
uppoU9
City
Hyd
Approac
p
$5.ng $20.00 $39600.00Rephce W
hers)W
BASEBID—2024/2025RAWW ATER-TREATEDW ATERPIPELINEFORTREATMENTPLANT, ITEMNo2324252627282930313233343536373839404142
CIPNo.2415DESCRIPTIONUNITRemoveExistingReducer.FurnishEAandInstall12”x8”ReducerConstructThrustBlockEAFurnishandInstall2"AirValveEAAssemFurnishandInstallModified2"EABlow-OffAssembFurnishandInstallWaterMainDropEAFIusherAssembFurnishandInstallWaterServiceEAConnectionFurnishandInstallWaterMainEAS rtPIExistingWaterlineEASlurryBackfill8"WaterMainandLFAbandoninPlaceBreakThroughChannelandInsertPipe,ReconstructChannelWallperEADetailRemoveExistingWaterValveandEADelivertoYardRemoveExistingHydrantandEAFurnishandInstallNewFirerantRemoveandReplaceSidewalkSFRemoveandReplaceDrivewaySFhRemoveandReplaceADACurbEARamRemoveandReplaceType"A"CurbLFandGutterAdjustWaterValvetoGradeEARelocateTrafficControlBoxEARemoveExistiWaterMainLFRemoveandCrossGutterSF ESTIMATEDQUANTITY1272
39062018011330160
EXTENDEDUNITPRICEITEMAMOUNT$4,500.00$4,500.00$450.00$12,150.00$11,850.00$23,700.00$10,250.00$10,250.00$10,250.00$20,500.00$7,500.00$37,500.00$8,750.00$35,000.00$950.00$6,650.00$10.00$3,900.00$7,500.00$15,000.00$950.00$5,700.00$15,750.00$31,500.00$35.00$13,650.00$45.00$27,900.00$9,500.00$9,500.00$125.00$10,000.00$450.00$450.00500.00$5,500.001$110.00TOTALBASEBID(num************************************************************************)E—C.$135,975.00

Page 121 of 170 ends

16.D.

Page 213 of 593 ends

One9] nthreeI:gndre%évthgasandfouLhundredseventy-?vedollars?ECBASEBIDTOTAL(inwords) andzerocents.Contractor'sInitials ADDITIVEABIDITEMSTOTAL(inwords)None
Contractor'sInitialsIntheeventofavariationbetweentheunitpriceandextendedtotal,theunitpricewillbeusedandthecorrectedextensionwillbeconsideredastheamountbid.lfthebidisillegibleandcannotbereconcileditwillbeconsiderednon-responsiveandwillnotbeconsideredforaward.Ifanadditiveand/oralternatebidscheduleiscalledforintheContractDocuments,thelowestbidwillbedeterminedonthebasisofthebasebidschedule(s)onlyunlessotherwisespecifiedintheNoticeInvitingBidsorbyAddendaifissuedtosupersedetheNoticeInvitingBidsonthisspecificissue.ForaContractwhereadeductivebidscheduleiscalledfor,thelowestbidwillbedeterminedbythetotalofallbidschedulesincludingthedeductivebidschedule(s).Regardlessofwhethertheadditive/deductiveoralternatesbiditemswillbeconsideredindeterminingthelowbid,theAgencymayelecttoincludeanyornoneoftheadditive/deductiveoralternatebiditems/schedules,ortootherwiseaddorremovecertainworkfromthesc0peofWork.Accordingly,Contractorwarrantsthateachbiditemcontainsaproportionateshareofprofit,overheadandothercostsandexpenses,whichwillbeincurredbytheContractorfortheProject.Ifequallowbidsarereceivedfromresponsibleandresponsivebidderstheselectionshallbemadebydrawinglots,orothersimilarrandomblindmethodselectedbytheAgency.IfonlyoneresponsivebidisreceivedfromaresponsiblebiddertheawardshallnotbemadeunlessthepricecanbedeterminedtobereasonablebasedonananalysisbytheAgency.TheAgency’sdeterminationastothereasonablenessofanysuchbidshallbefinal.TheAgencyreservestherighttorejectanyorallbids,towaiveanyirregularity(ies),andtotakeallbidsunderadvisementforaperiodofsixty(60)calendardaysafterthedatethebidsarepubliclyopened.BidderacknowledgesthatallcostsincurredasaresultofpreparingtheproposalshallbethesoleresponsibilityofBidder.TheNoticeInvitingBidsandInstructionstoBiddersdoesnotcreateorimposeanyobligationupontheAgencytoenterintoacontract.Allbidsreceivedshallberecordedonanabstract(tabulation)ofbids,andthenmadeavailableforpublicinspectionwithintwobusinessdaysofbidopening.

Page 122 of 170 ends

16.D.

Page 214 of 593 ends

swam
Thequantitieslistedinthebidproposalareprovidedtogiveageneralindicationofthescopeoftheworkandforthecomparisonofbids.Nowarrantyismade,eitherexpressedorimplied,thattheactualquantitiesofworktobedonewillcorrespondtherewith.Itemnumbersfollowedby”(S)"aredesignatedas whichwillnotbeincludedtowardsthecalculationofminimumof50percentofworktobeperformedbyContractor’sownforces.BysigningandsubmittingthisbidtheContractorconfirmsthattheyarefamiliarwiththeworksiteandallexistingconditionsthatmayaffecttheirworkandthattheyhavereadandagreetoalltheterms,conditionsandrequirementscontainedorreferencedhereinorintheContractDocumentsandthatalltheaforementionedhasbeenincludedinthebidpriceslistedabove,includingitemsofworkthatmaynothaveaspecificpaylineitemandthatthereshallbenoadditionalcoststotheAgency. '
W ARNING:IfanaddendumoraddendahavebeenissuedbytheAgencyandnotnotedaboveasbeingreceivedbythebidder,thisBidmayberejected.

Page 123 of 170 ends

16.D.

Page 215 of 593 ends

06 m
/ barbW 10/13/2025iign
Completethefollowing:CEMConstructionCorporation1000000805951234Legalnameofthebusiness,DIRReg.andContractorLicenseNos.CorporationBusinessType(Corporation,Partnership,SoleProprietor)CEMConstructionCorporationDBA(ifany)JesusECarrilloPresidentNameandtitleoftheowner FminrlinCarrillo\/iDrncirlnntNameandtitleofsecondpartnerorofficer1412EspanolAveMontebello,CA90640BusinessAddress323-597-1084Telephonenumber562-381-9129Facsimilenumber JesusECarrilloestimatino?cem-constrlIntinnmmNameandEmailaddressofprimarycontacthttpszl/cem-construction.com/Companywebaddress 10/13/2025atureofBidder DateSignatureBidder Date
JesusECarrilloPresident EmigdioCarrilloVicePresidentPrintnameandtitle Printnameandtitle(IftheBidderisacorporationtwosignaturesofcorporateofficersarerequired.)

Page 124 of 170 ends

16.D.

Page 216 of 593 ends

3/2025 WfSignature
CERTIFICATEREGARDINGCONTRACTOR'SLICENSE1.ContractorisrequiredtopossessoneofthefollowingStateContractor'sLicense:StateofCaliforniaClass'A’Contractor‘sLicenseCombinationofSpecialtyClasslC’Contractor’sLicenses2.Afailureto(1)possesstherequiredlicense,(2)truthfullysetforththefollowinginformation,and/or(3)executethisCertificatemayrendertheproposalnonresponsiveandpermittheCitytorejecttheproposal.(BusinessandProfessionsCodeSection7028.15)3.Contractordeclares,underpenaltyofperjury,thathe/she/itpossessestherequiredContractor'slicense(s)which:aBearsthelicensenumber(s):951234A,B,C-8,C-12.C-21.C-27,0-36bExpireson:08/31/2026 10/1 10/13/2025ofer DateSignatureBidder Date
JesusECarrilloPresident EmigdioCarrilloVicePresidentPrintnameandtitle Printnameandtitle(IftheBidderisacorporationtwosignaturesofcorporateofficersarerequired.)ThisrequiredlicensedeterminationhasbeenmadebytheAgency.AnyContractorholdingadifferentlicensewhofeelsheisqualifiedtobidonthisworkmustsoadvisetheAgencyatleastseven(7)dayspriortothebidopening.TheAgencymayconductareviewofthecontemplatedworktore-evaluatetherequiredlicensedetermination.TheAgencymayinitssolediscretionmaintainorchangetherequiredlicensedetermination;Agency’sdecisionastotherequired

Page 125 of 170 ends

16.D.

Page 217 of 593 ends

10%ofAmountBid
Corpo
ri 47‘Ace Mex
MerchantsBondinComanMutual
BondNo.T825-425
BIDSECURITYFORMFORBONDKNOWALLBYTHESEPRESENTSThattheundersignedCEMConstructionCorporation(NameofContractor)asPrincipalandtheundersignedasSuretyareheldandfirmlybounduntoOwner,CITYOFHEMET,apoliticalsubdivisionoftheStateofCalifornia,asobligee,inthepenalsumof(MAmountInWordsITenPercentofAmountBidDollars($ )lawfulmoneyoftheUnitedStatesofAmericabeingatleasttenpercent(10%)oftheaggregateamountofsaidPrincipal’sbaseBid,forthepaymentofwhich,wellandtrulytobemade,webindourselves,oursuccessors,executors,administrators,andassigns,jointlyandseverally,firmlybythesepresents.WHEREAS,saidPrincipalissubmittingaBidfor2024/2025RAWW ATER—TREATEDW ATERPIPELINEFORTREATMENTPLANT,2415THECONDITIONOFTHISOBLIGATIONISSUCHthatiftheBidsubmittedbythesaidPrincipalbeacceptedandtheContractbeawardedtosaidPrincipalandsaidPrincipalshallwithintherequiredperiodsenterintotheContractsoawardedandprovidetherequiredConstructionPerformanceBond,ConstructionLaborandMaterialPaymentBond,insurancecertificates,andallotherendorsements,forms,anddocumentsrequiredundertheInstructionstoBidders,thenthisobligationshallbevoid,otherwisetoremaininfullforceandeffect.INWITNESSWHEREOF,theaboveboundenpartieshaveexecutedthisinstrumentthis15thdayofOctober 2025(Month)CEMConstructionration (CorporateSeal) ncipaBv
(CorporateSeal) ByKerissai,Attorney-act
m(J

Page 126 of 170 ends

16.D.

Page 218 of 593 ends

] JEREMVEUSNCOMM.325293175“nounwalwom?cams:scum

ACKNOWLEDGMENT
Anotarypublicorotherofficercompletingthiscertificateverifiesonlytheidentityoftheindividualwhosignedthedocumenttowhichthiscertificateisattached,andnotthetruthfulness,accuracy,orvalidityofthatdocument.StateofCaliforniaCountyof OrangeJeremyBush,NotaryPublic(insertnameandtitleoftheofficer)On reme, personallyappearedKerlssaRICCIardIwhoprovedtomeonthebasisofsatisfactoryevidencetobetheperson(s)whosename(s)is/aresubscribedtothewithininstrumentandacknowledgedtomethathe/she/theyexecutedthesameinhis/her/theirauthorizedcapacity(ies),andthatbyhis/her/theirsignature(s)ontheinstrumenttheperson(s),ortheentityuponbehalfofwhichtheperson(s)acted,executedtheinstrument.IcertifyunderPENALTYOFPERJURYunderthelawsoftheStateofCaliforniathattheforegoingparagraphistrueandcorrect.

WITNESSmyhandandofficialseal
Signature (Seal)

Page 127 of 170 ends

16.D.

Page 219 of 593 ends

MERCHANN
respectivecams
SBONDINGCOMPANYTMPOWEROFATTORNEYKnowAllPersonsByThesePresents,thatMERCHANTSBONDINGCOMPANY(MUTUAL)andMERCHANTSNATIONALBONDING,INC.,bothbeingcorporationsoftheStateofIowa,andMERCHANTSNATIONALINDEMNITYCOMPANY,anassumednameofMerchantsNationalBonding,Inc.,(hereincollectivelycalledthe“Companies")doherebymake,constituteandappoint,individually,CharoJRosemond;JamesBaldassare;JohnFSurano;KerissaRicciardi;KristaADiMezza;LisaMScavetta:MichaelCastaneda;MichaelDugan;SherryanneMDePirro theirtrueandlawfulAttorney(s)—in-Fact,tosignitsnameassurety(ies)andtoexecute,sealandacknowledgeanyandallbonds,undertakings,contractsandotherwritteninstrumentsinthenaturethereof,onbehalfoftheCompaniesintheirbusinessofguaranteeingthe?delityofpersons,guaranteeingtheperformanceofcontractsandexecutingorguaranteeingbondsandundertakingsrequiredorpermittedinanyactionsorproceedingsallowedbylaw.ThisPower-of—AttorneyisgrantedandissignedandsealedbyfacsimileunderandbyauthorityoftheBy-LawsadoptedbytheBoardofDirectorsoftheCompanies."ThePresident,Secretary,Treasurer,oranyAssistantTreasureroranyAssistantSecretaryoranyVicePresidentshallhavepowerandauthoritytoappointAttorneys-in—Fact,andtoauthorizethemtoexecuteonbehalfoftheCompany,andattachthesealoftheCompanythereto,bondsandundertakings,recognizances,contractsofindemnityandotherwritingsobligatoryinthenaturethereof."“Thesignatureofanyauthorizedof?cerandthesealoftheCompanymaybeaf?xedbyfacsimileorelectronictransmissiontoanyPowerofAttorneyorCerti?cationthereofauthorizingtheexecutionanddeliveryofanybond,undertaking,recognizance,orothersuretyshipoobligationsoftheCompany,andsuchsignatureandsealwhensousedshallhavethesameforceandeffectasthoughmanually?xed."InconnectionwithobligationsinfavoroftheFloridaDepartmentofTransportationonly,itisagreedthatthepowerandauthorityherebygiventotheAttorney-in-Factincludesanyandallconsentsforthereleaseofretainedpercentagesand/or?nalestimatesonengineeringandconstructioncontractsrequiredbytheStateofFloridaDepartmentofTransportation.ItisfullyunderstoodthatconsentingtotheStateofFloridaDepartmentofTransportationmakingpaymentofthe?nalestimatetotheContractorand/oritsassignee,shallnotrelievethissuretycompanyofanyofitsobligationsunderitsbond.InconnectionwithobligationsinfavoroftheKentuckyDepartmentofHighwaysonly,itisagreedthatthepowerandauthorityherebygiventotheAttorney-in-Factcannotbemodi?edorrevokedunlesspriorwrittenpersonalnoticeofsuchintenthasbeengiventotheCommissioner- DepartmentofHighwaysoftheCommonwealthofKentuckyatleastthirty(30)dayspriortothemodi?cationorrevocation.InWitnessWhereof,theCompanieshavecausedthisinstrumenttobesignedandsealedthis2nddayof June,2025N ‘o‘I ‘o MERCHANTSBONDINGCOMPANY(MUTUAL).MERCHANTSNATIONALBONDING,INC.' ‘ MERCHANTSNATIONALINDEMNITYCOMPANYz o-a'‘ E'-"-2003- , 7“ .0.Byfr ‘. o.‘ PresidentSTATEOFIOW ACOUNTYOFDALLASss.Onthis2nddayof June2025,beforemeappearedLarryTaylor,tomepersonallyknown.whobeingbymedulysworndidsaythatheisPresidentofMERCHANTSBONDINGCOMPANY(MUTUAL),MERCHANTSNATIONALBONDING,INC.,andMERCHANTSNATIONALINDEMNITYCOMPANY;andthatthesealsaf?xedtotheforegoinginstrumentaretheCorporateSealsoftheCompanies;andthatthesaidinstrumentwasnedandsealedinbehalfoftheComauthorityoftheir ofDirectors.PenniMillerCommissionNumber787952MyCommissionExpiresJanuary20,2027(Expirationofnotary'scommissionNotaryPub/redoesnotinvalidatethisinstrument)I,ElisabethSandersfeld,SecretaryofMERCHANTSBONDINGCOMPANY(MUTUAL),MERCHANTSNATIONALBONDING,INC.,andMERCHANTSNATIONALINDEMNITYCOMPANYdoherebycertifythattheaboveandforegoingisatrueandcorrectcopyofthePOWER-OF-ATTORNEYexecutedbysaidCompanies,whichisstillinfullforceandeffectandhasnotbeenamendedorrevoked.InWitnessWhereof,Ihavehereuntosetmyhandandaf?xedthesealoftheCompaniesonthis15thdayofOCIOber,2025o' I ‘°"44‘ .P . °.: I-{1’I I'. ' Secretary0Ql Ia‘
POA0018(5/25)
mes

Page 128 of 170 ends

16.D.

Page 220 of 593 ends

[ —[state].

Io nuMAI at Signaturof
NON-COLLUSIONAFFIDA VITPUBLICCONTRACTCODESECTION7106NON-COLLUSIONDECLARATIONTOBEEXECUTEDBYBIDDERANDSUBMITTEDWITHBIDTheundersigneddeclares:IamthePresidentofCEMConstructionnnrnmiinnthepartymakingtheforegoingbid.Thebidisnotmadeintheinterestof,oronbehalfof,anyundisclosedperson,partnership,company,association,organization,orcorporation.Thebidisgenuineandnotcollusiveorsham.Thebidderhasnotdirectlyorindirectlyinducedorsolicitedanyotherbiddertoputinafalseorshambid.Thebidderhasnotinanymanner,directlyorindirectly,soughtbyagreement,communication,orconferencewithanyonetofixthebidpriceofthebidderoranyotherbidder,ortofixanyoverhead,profit,orcostelementofthebidprice,orofthatofanyotherbidder.Allstatementscontainedinthebidaretrue.Thebidderhasnot,directlyorindirectly,submittedhisorherbidpriceoranybreakdownthereof,orthecontentsthereof,ordivulgedinformationordatarelativethereto,toanycorporation,partnership,company,association,organization,biddepository,ortoanymemberoragentthereof,toeffectuateacollusiveorshambid,andhasnotpaid,andwillnotpay,anypersonorentityforsuchpurpose.Anypersonexecutingthisdeclarationonbehalfofabidderthatisacorporation,partnership,jointventure,limitedliabilitycompany,limitedliabilitypartnership,oranyotherentity,herebyrepresentsthatheorshehasfullpowertoexecute,anddoesexecute,thisdeclarationonbehalfofthebidder.IdeclareunderpenaltyofperjuryunderthelawsoftheStateofCaliforniathattheforegoingistrueandcorrectandthatthisdeclarationisexecutedon10/13/2025date],atMontebellocity],California ureofBidder Date Bidder DateJesusECarrilloPresident EmigdioCarrilloVicePresidentPrintnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturescorporatearerequired.)

Page 129 of 170 ends

16.D.

Page 221 of 593 ends

MorenoValleyCityHallAnnex#1WaterMeler/Serv
,,Va|.-, .. .. _.H . Val.V . _
Replacement aren
uth ,,, ,,
_.. neerinq w _. -
CONTRACTOR'SREFERENCELISTAttachtothisbidalistofthree(3)projectsinthepastfive(5)yearsonwhichthebidderandhissubcontractor(s)havesuccessfullyconstructedandcompletedprojectswiththesametype(elements),sizeandcomplexityofwork.TheAgencyEngineerwillmakethefinaldeterminationofwhethertheprojectslistedhereareofthesametype,sizeandcomplexityasthisproject.Failureofbiddertosupplysufficientdocumentationofsimilarelectric,telephone,cableandsanitarysewerundergroundfacilitiesexperienceshallbeconsideredgroundsforanon-responsivebidand,attheAgency’sdiscretion,saidbidwillbedisqualified.ProjectName: iceConnectionDateofCompletion:06/2025ContractPrice:$340,975.00Name,Address,andTelephoneNumberofOwner'sRepresentative:CitvofMorenolml14231Frederick81Mnrennlm/CA99553RickyCarrilloAssociateEngineer,AraceliSahagunPhonenumber:(951)413-3155ProjectName:WaterMainandStreetRehabilitationProiectonM00AveDateofCompletion:04/2025ContractPrice$659,105.00Name,Address,andTelephoneNumberofOwner'sRepresentative:CitvofAlhambra11180FirstStreetAlhambra.CA91801626-300-1562 ThnmagAmnreani DrninnfRnnninlief898—200—1569ProjectNameAnabel-WoodburyWaterImprovementProiectContractPrice:$2_097_545_ooDateofCompletion:05/2024Name,Address,andTelephoneNumberofOwner'sRepresentativeCitvofGardenGrove11222AcaciaParkwayGardenGrove.CA92840LivanJin.AssociateEeer-714-741-5977 (Attachadditionalpagesasnecessary)

Page 130 of 170 ends

16.D.

Page 222 of 593 ends

0VPom/fw“
— -
SUM/«WW,are V AMe’rer
Hoeokme1 _ WNW.

F10"i“”IM7‘" ‘W‘WVWpIA
DESIGNATIONOFSUBCONTRACTORSNameofSubcontractorDescriptionand DIREmailandLocationofPlacePercentageofSubcontractor’sRegistrationAddressofBusinessWorkLicenseNo.Number (Biddertoattachadditionalsheetsifnecessary)(PUBLICCONTRACTCODE§4100ETSEQ.) SUKVET/JV”(0-9"7'LS8’13}IOOOOO’

Page 131 of 170 ends

16.D.

Page 223 of 593 ends

BIDDERCERTIFICATIONSTOBEEXECUTEDBYALLBIDDERSANDSUBMITTEDWITHBIDTheundersignedBiddercertifiestoOwnerassetforthinsections1through10,below.STATEMENTOFCONVICTIONSBymysignaturehereunder,Iherebyswear,underpenaltyofperjury,thatnomorethanonefinal,unappealablefindingofcontemptofcourtbyaFederalCourthasbeenissuedagainstBidderwithinthepasttwoyearsbecauseoffailuretocomplywithanorderofaFederalCourtortocomplywithanorderoftheNationalLaborRelationsBoard.CERTIFICATIONOFWORKER'SCOMPENSATIONINSURANCEBymysignaturehereunder,astheContractor,IcertifythatIamawareoftheLaborCodeSection3700,whichrequireseveryemployertobeinsuredagainstliabilityforworker'scompensationortoundertakeself-insuranceinaccordancewiththeprovisionsofthatCode,andIwillcomplywithsuchprovisionsbeforecommencingtheperformanceoftheworkofthisContract.PleasenotethatthesubmittalofthiscertificatedoesnotrelieveContractorfromcomplyingwithalloftheinsurancerequirementsofthePublicWorksAgreementandContractDocuments.CERTIFICATIONOFPREV AILINGW AGERATESANDRECORDSBymysignaturehereunder,astheContractor,IcertifythatIamawareofLaborCodeSection1773,whichrequiresthepaymentofprevailingwageonpublicprojects.ContractorandanysubcontractorsundertheContractorshallcomplywithLaborCodeSection1776regardingwagerecords,andwithLaborCodeSection1777.5regardingtheemploymentandtrainingofapprentices.ContractorisresponsibletoensurecompliancebyanyandallsubcontractorsperformingworkunderthisContract.CERTIFICATIONOFCOMPLIANCEWITHPUBLICWORKSCHAPTEROFLABORCODEBymysignaturehereunder,astheContractor,IcertifythatIamawareofLaborCodeSections1777.1and1777.7Code,andContractorandSubcontractorsareeligibletobidandworkonpublicworksprojects.CERTIFICATIONOFNON-DISCRIMINATIONBymysignaturehereunder,astheContractor,Icertifythattherewillbenodiscriminationinemploymentwithregardtorace,color,religion,gender,sexualorientation,ageornationalorigin;thatallfederal,state,andlocaldirectivesandexecutiveordersregardingnon-discriminationinemploymentwillbecompliedwith;andthattheprincipalofequalopportunityinemploymentwillbedemonstratedpositivelyandaggressively.

Page 132 of 170 ends

16.D.

Page 224 of 593 ends

%ig Signaturzf
CERTIFICATIONOFNON-DISQUALIFICATIONBymysignaturehereunder,astheContractor,Iswear,underpenaltyofperjury,thatthebelowindicatedBidder,anyofficerofBidder,oranyemployeeofBidderwhohasaproprietaryinterestinsuchBidder,hasneverbeendisqualified,removed,orotherwisepreventedfrombiddingon,orcompletingaFederal,State,orlocalgovernmentprojectbecauseofaviolationoflaworsafetyregulation,exceptasindicatedontheseparatesheetattachedheretoentitled”PreviousDisqualifications."Ifastatementof”PreviousDisqualifications”isattached,pleaseexplainthecircumstances.CERTIFICATIONOFADEQUACYOFCONTRACTAMOUNTBymysignaturehereunder,astheContractor,pursuanttoLaborCodeSection2810(a),lcertifythat,ifawardedtheContractbasedontheundersigned’sBid,theContractwillincludefundssufficienttoallowtheContractortocomplywithallapplicablelocal,state,andfederallawsorregulationsgoverningthelabororservicestobeprovided.IunderstandthatOwnerwillberelyingonthiscertificationifitawardstheContracttotheundersigned.CERTIFICATIONREGARDINGDIRCONTRACTOR/SUBCONTRACTORREGISTRATIONBymysignaturehereunder,astheContractor,IcertifythatContractor,andalllistedSubcontractorsarethesubjectofcurrentandactivecontractorregistrationspursuanttoDivision2,Part7,Chapter1(commencingwithsection1720)oftheCaliforniaLaborCode.Contractor’sregistrationnumberis[pleasecomplete]1000000805Subcontractors’registrationnumbersareasindicatedinDocument004314 BIDDER10/13/2025 10/13/2025natureofBidder Date Bidder Date JesusECarrilloPresident EmladioCarrilloVicePresidentPrintnameandtitle Printnameandtitle(IftheBidderisacorporation,twosignaturescorporatearerequired.)

Page 133 of 170 ends

16.D.

Page 225 of 593 ends

MorleyBuildersProjectName:That
BDziubengMORLEYBUILDERS‘com
CigofAnaheim
Jlordananaheimmet
CigofAnaheim
Pageil1412ESPANOLA VEMONTEBELLO,CALIFORNIA90640323/597-1084562/708-3586Lic.#951234

CEMSEWERPROJECTANDREFERENCELIST
cherYardProject(No.2106004)Description:InstallationofSchedule40PVCpipes(1",2",4",6"),pointofconnections,4"watermeter,4"reducedpressureback?owpreventer,andthrustblocksonallwaterlinesContractAmount:$792,915.00Contact:BrittanyDziubekPhonenumber:310-382-8463Email:Completed:09/2024 OwnerAddress:CityofAnaheim200S.AnaheimBlvd.Anaheim,CA92805ProjectName:NorthVineStreetSanitarySewerImprovementsDescription:Replacementofexistingcastironwatermainswithnew10"ductileironpipewatermains,includingasphaltpavingandrepairstosidewalks,curbs,andgutters.ContractAmount:$1,048,898.00Contact:Joe]JordanPhonenumber:714-231-8368Email:Completed:05/2023 OwnerAddress:CityofAnaheim200S.AnaheimBlvd.Anaheim,CA92805ProjectName:LincolnAveSanitarySewerandStreetImprovementsDescription:Installationofnew12",15",and21"diameterVitri?edClayPipe(VCP),constructionofsanitarysewermanholes,manholeremodeling,roadwayrehabilitation,PCCsidewalks,ADAaccessramps,curbs&gutters,andrelatedstreetwork.ContractAmount:$1,721,945.50Contact:Joe]JordanPhonenumber:714-231-8368Email:[email protected]:05/2024 1412EspanolAve-Montebello,CA,90640323597-1084Contractor’sLicenseA#951234CUCPID:43965,SBEDIRNo.:1000000805 NSTQUTi

Page 134 of 170 ends

16.D.

Page 226 of 593 ends

[email protected]
CigofInglewood
rrobinson@cityo?nglewood.org
CigofSantaAna
sthomasS@santa—ana.org
CityofTemg|eCig
okan‘demirci@!ranstech.org
PagelzMorleyBuildersProjectName:832-837CahuengaProject(No.2006005)Description:InstallationofPVCC—900WaterLine,pointofconnection,back?owpreventer,laterallineinpublicright-of—way,C900Firewaterline,doublecheckvalve,and?reconnectionwallmount.ContractAmount:$487,064.00Contact:CraigBabingtonPhonenumber:310-384-8494Email:Completed:04/2024 OwnerAddress:OneManchesterBoulevardInglewood,CA90301ProjectName:AsNeededRepairServiceonSewerSystemDescription:Repairorreplacementofsewerandstormdrainsystemsincludingexcavation,newVCPpipeinstallation,manholeinstallation,andassociatedasphaltandconcretework.ContractAmount:$344,250.00Contact:RooseveltRobinsonPhonenumber:310-259-9969Email:Completed:05/2023 OwnerAddress:20CivicCenterPlazaSantaAna,CA92701ProjectName:Raitt—MyrtleParkProjectDescription:Sitepreparationanddemolition,grading/drainage,installationofwaterdrainagepipes,onsitepaving,hardscaping,fencing,sitefurnishings,playgroundand?tnessequipment,irrigation,andstreetimprovements.ContractAmount:$2,776,406.00Contact:AriamVeira,SeanThomasPhonenumber:714-647-6757/714-647-5624Email:[email protected],Completed:03/2024 OwnerAddress:9701LasTunasDriveTempleCity,CA91780ProjectName:PrimroseParkProjectDescription:Sitepreparationanddemolition,grading,installationofwaterdrainagepipes,onsitepaving,hardscaping,fencing,sitefurnishings,playgroundand?tnessequipment,irrigation,andstreetimprovementsContractAmount:$2,470,087.50Contact:OkanDemirciPhonenumber:714-319-6137Email:Completed:05/2022 1412EspanolAve-Montebello,CA,90640323597-1084Contractor’sLicenseA#951234CUCPID:43965,SBE0DIRNo.:1000000805

Page 135 of 170 ends

16.D.

Page 227 of 593 ends

GigofLongBeachPublicWorksDegarmlent
Valeri‘Karakanov@lbwater,org
Page|3
OWnerAddress:1841E33rdStLongBeach,California90807ProjectName:SewerLateralPilotProjectDescription:Removalandreplacementofsewer,rehabilitationofexistingsewerpipes,andassociatedstreetrestoration.ContractAmount:$550,225.00Contact:ValeriKarakanov,Phonenumber:562-570-2331Email:Completed:09/2022 RockwoodConstructionProjectName:-PerrisMarchPlazaDescription:StormdraininstallationandrehabilitationincludingHDPEpipes,onsitewatermanagement,andconnectionstoexistingmanContractAmount:$292,985.00Contact:DanielHernandezPhonenumber:323-722—4805Email:[email protected]:2020 Ed0J.Carrillo,M.S.,P.E.jectManagerC:562-708—[email protected] 1412EspanolAveMontebello,CA,90640323597-1084Contractor’sLicenseA#951234CUCPID:43965,SBE0DIRNo.:1000000805

Page 136 of 170 ends

16.D.

Page 228 of 593 ends

ChofLagunuBeach
cmofAlhambra
CMofDlamondBar
Page|11412ESPANOLA VEMONTEBELLO,CALIFORNIA90640323/597-1084562/708-3586Lic.#951234

CEMSTORMDRAINPROJECTANDREFERENCELIST
Address:505ForestAvenueLagunaBeach,CA92651ProjectName:C.I.P.ProjectNO.154JasmineSt.StormDrainImprovementsDescription:Theworkentailsinstallingapproximately2,400linearfeetofstormdrainpipe,includingjackinga28-inchsteelcasingfora24-inchPVCpipeunderPacificCoastHighway.Thisincludescatchbasininstallationsandalow-flowdiversionsystem.ContractAmount:$1,688,479.00Contact:MatthewOxford/MarkMcAvoyPhonenumber:949-497-0792/949-497-0711Email:[email protected]:10/2022 Address:111SouthFirstStreetAlhambra,CA91801ProjectName:NIBN2M24—29RehabilitationofTheStormDrainPipesProjectOnCommonwealthAveandGrandAveDescription:replaceexistingstormdrainpipeonCommonwealthAvenueandofexistingstormdrainpipeonGrandAvenue,andrelatedappurtenancesincludingrepairingADAramps,pavingandrestriping.ContractAmount:$195,875.00Contact:ThomasAmarePhonenumber:626—300—1562,C1626-425-8477,Email:[email protected]:11/2024 Address:21810CopleyDriveDiamondBarCalifornia91765ProjectName:SteepCanyonTrailDescription:Thecontractorisresponsibleforfurnishingalllabor,tools,materials,andequipmenttocompletetheSycamoreCanyonParkSlope/TrailRepairProject.Thisincludesapproximately500linearfeetofRCP,substitutedwithHDPE.ContractAmount:$1,099,l40.00Contact:ChristianMdlpicaPhonenumber:909-839—7042Email:[email protected]:11/20191412EspanolAve-Montebello,CA,906400323597-10840

Page 137 of 170 ends

16.D.

Page 229 of 593 ends

cumofOrange
MorleyBuilders
Page|2
Address:300E.ChapmanAve.Orange,CA92866ProjectName:BidNo.23—2435:8-250;AnnualSewerReplacement/MaintenanceFY2023-2024Description:4200ftremoveExistingSewerandConstruct8”VCPSewerMainand600ftremoveExistingSewerandConstructi0"VCPSewerMain,ConnectSewerLateral,Constructmanholes,and970ftconstructfulllengthTrenchlessrehabilitationofexisting6"VCPSewerMainbyCure-in-PlacePipeLiner,Construct664ftof8"PVCStormDrainPipeandcatchbasinincludingasphaltpavingandrepairstosidewalks,curbs,andgutters,andcross—gutters.ContractAmount:$2,079,l70.00Contact:RandyNguyen,P.E,SalvadorJordanMunozPhonenumber:(7l4)744-5531Email:[email protected] ProjectName:832—837CahuengaProject(No.2006005)Description:InstallationofPVCC-900WaterLine,pointofconnection,backflowpreventer,laterallineinpublicright-of—way,C900Firewaterline,doublecheckvalve,andfireconnection,newstormdraincatchbasinsandtrenchdrains,cisterntankandmechanicalskidpad,CDSunitandstormdraininlets,new6"VCPsewerlateralconnection.ContractAmount:$487,064.00Contact:CraigBabingtonPhonenumber:310-384-8494Email:[email protected]:04/2024 RockwoodConstructionProjectName:WetUtilities-PerrisMarchPICIZCIDescription:4",6",8"C900watermainsfordomesticandfireservice,double-checkvalves,hottappingto36"mainline,firehydrants,andbackflowpreventers.New8"SDR35sewerpipesand48"sanitarysewermanholes,30"RCPoutletstofloodcontrol,30"HDPEpipestormdrain,catchbasins,stormdrainstructures,andaninfiltrationpit.ContractAmount:$1,100,000Contact:AlexSanchezPhonenumber:949-423-4784Email:[email protected]:2020 1412EspanolAveMontebello,CA,906400323597-1084No.:1000000805

Page 138 of 170 ends

16.D.

Page 230 of 593 ends

CH1ofSantaAna
CH1ofTemgleClix
Page|3
CityofInglewoodAddress:OneManchesterBoulevardInglewood,CA90301ProjectName:AsNeededRepairServiceonSewerSystem(AndStormDrain)Description:Labor,equipment,andmaterialsforsewerandstormdrainsystemrepairs.Replacementof4",6",8“,10”,andi2”VCPpipe,deepexcavation,sawcutting,bedding,slurrybackfill,newpipeinstallation,andtrafficmanagement.New12"SDR35stormdrainpipetocatchbasins.ContractAmount:$344,250.00Contact:RooseveltRobisonPhonenumber:310-412-5333Email:rrobinson@cityo?nglewood.orgCompleted:05/2023 Address:20CivicCenterPlazaSantaAna,CA92701ProjectName:Raitt-MyrtleParkProjectDescription:Thisprojectencompassessitepreparation,demolition,grading,installationofwaterlines,stormdrainpipe,catchbasin,dropin—lets,NDSinfiltrationbasin,paving,hardscaping,andcomprehensivestreetimprovementsincludingirrigation,waterconnectionsandstormdraincatchbasin.ContractAmount:$2,776,406.00Contact:AriamVeira,SeanThomasPhonenumber:714-647-6757/714-647—5624Email:aveira@santa—ana.org,[email protected]:03/2024 Address:9701LasTunasDriveTempleCity,CA91780ProjectName:PrimroseParkProjectDescription:Projecttasksincludesitepreparation,demolition,grading,installationofwaterdrainagepipes,in?ltrationbasin,onsitepaving,hardscaping,andotherrelatedstreetimprovementsContractAmount:$2,470,087.50Contact:OkanDemirciPhonenumber:714-319—6137Email:[email protected]:05/2022 1412EspanolAveMontebello,CA,90640323597-1084

Page 139 of 170 ends

16.D.

Page 231 of 593 ends

CityofDuarte
cmofPomona
,/’
uard?)Brgject
CENI
Page|4
Address:1600HuntingtonDriveDuarte,CA91010ProjectName:ConstructionofDrywell&CatchBasinatRoyalOaksParkDescription:Constructionofadrywellsystem,whichincludesopeningacatchbasinwithanARSunitandmanhole,andconnectingpipestothedrywell.ContractAmount:$73,200.00Contact:YessinaSerraPhonenumber:626—357-7931Email:[email protected]:07/2020 Address:505S.GareyAve.Pomona,CA91766ProjectName:PhilandNellSotoParkDescription:installationofPVCdrainpipesofvarioussizes(6",8",12",and15"),installationofastandardandmodifiedcatchbasin,oni5"x15"NyloplastH-iOcastirongrateandassembly,aparkwaydrain,andacastbasinfilterinsertamongotherimprovements.ContractAmount:$2,297,151.50Contact:MattPillarz/ReneGuerreroPhonenumber:909—620—3652/909-620-2261Email:[email protected]:04/2020 EdJ.Carrillo,M.S.,P.E.ManagerC:562-708—3586EddieC@CEM—Construction.com 1412EspanolAveMontebello,CA,90640323597-10840
‘ N1}I{2%}:1‘.g[(DN

Page 140 of 170 ends

16.D.

Page 232 of 593 ends

CigofOrange
RE
Page|11412ESPANOLA VEMONTEBELLO,CALIFORNIA90640323/597-1084562/708-3586Lic.#951234

CEMW ATEPROJECTANDREFENCELIST
Address:14331FrederickSt.MorenoValley,CA,92553ProjectName:MorenoValleyCityHallAnnex#1WaterMeter/ServiceConnectionDescription:ConstructionandinstallationofaWaterSupplyManifoldfortwoEasternMunicipalWaterDistrict(EMWD)watermeters,onefordomesticandoneforlandscaping,toserviceheCityofMorenoValleyCityHallBuildingAnnex#1.installationofPVCpipeforlandscapeanddomesticwaterlines,installationofnewirrigationvalves,Timercontrols,valvecoverboxes,disconnectionandcappingofanexistingdomesticwaterline,trenchingthroughconcretesidewalkandasphalt,installationofawatersupplymanifoldincludingcopperservicepipeandassociatedconnectiontoanexisting12"EMWDlineandback?llaccordingtoCityofMorenoValleyStandards.ContractAmount:$340,975.00Contact:RickyCarrilloAssociateEngineer,AraceliSahagunPhonenumber:(951)413-3155Email:rickyc@mova|.org,[email protected]:6/2025 Address:300E.ChapmanAve.Orange,CA92866ProjectAnnualPipelineRenewalProject(BidNo23-2425)Description:Removalandconstructionof8"and10"VCPsewermains,manholes,andlateralswithbeddingandback?llpercitystandards.Tasksincludetrenchlessrehabilitationofexistingsewer,manholeadjustments,andconnections.InstallationofPVCstormdrainpipes,drainageinlets,andcatchbasins,withconcreteworklikecurbandgutterremoval.Additionalworkincludescuttingandsealingsewermains,connectingcatchbasinwalls,andtrenchrepairsContractAmount:$2,547,770.00Contact:ChrisMielkePhonenumber:714-288-2487Email:[email protected]:3/2025 1412EspanolAve-Montebello,CA,90640I323597-1084Contractor'sLicenseA#951234CUCPID:43965,SBEIDIRNo.:1000000805

Page 141 of 170 ends

16.D.

Page 233 of 593 ends

CigofAlhambra
MorleBullders
CigofGardenGrove
Page|2
Address:111SouthFirstStreetAlhambra,CA91801Project:WaterMainReplacementandStreetRehabilitationProjectonMarengoAveDescription:Mobilization,trafficcontrol,shoring,surveying,andwaterpollutionmanagement.Replacementofexistingcastironwatermainswithnew10—inchductileironpipe,includinginstallationofvalves,firehydrants,waterservices,andabandonmentofoldmainsandhydrants.ConnectionsatMarengoAveandAlhambraRd,potholingutilities,andremodelingconflictingsewerlaterals.Asphaltconcrete(AC)pavementmilling,overlay,andslotpatching,alongwithrepairstosidewalks,driveways,curbs,andgutters.Adjustmentstovalves,manholeframes,andstriping.Pressuretesting,disinfection,andsurveywork.ContractAmount:$659,105.00Contact:ThomasAmareEngineeringProjectSpecialistPhonenumber:626-300-1562Email:[email protected]:04/2025 ProjectName:ThatcherYardProject(No.2106004)Description:Installationof4"and6"PVCC—900WaterLine,pointofconnection,backflowpreventer,laterallineinpublicright-of-way,4"and6"C900Firewaterline,doublecheckvalve,andfireconnection,newstormdraincatchbasinsandtrenchdrains,cisterntankandmechanicalskidpad,CDSunitandstormdraininlets,new4new6"VCPsewerlateralconnectionandnewsewermanhole.ContractAmount:$792,915.00Contact:BrittanyDziubek.Phonenumber:3i0—382—8463Email:[email protected]:09/2024 Address:11222AcaciaParkwayGardenGrove,CA92840ProjectAnabel-WoodburyWaterImprovementProjectDescription:Clearing,grubbing,andmobilization/demobilization.InstallationofvariousPVCwaterpipes(12",8",6",4")including?ttings,thrustblocks,andappurtenances,withtrenching,backfill,compaction,andasphaltrepairs.Installationofductileirongatevalves,?rehydrants,waterservices,andtemporary/permanentverticaloffsets.Abandonmentofexistingwatermainsandhydrants,includingtrenching,back?ll,andasphaltrepairs.Installationofairreleasevalveassemblyandconcreterepairs.Traf?ccontrol,removalandreplacementofconcretecrossgutter,curb,gutter,sidewalk,buspads,andotherrelatedtasks.Additionalworkincludespotholing,over-excavation,soildisposal,ContractAmount:$2,097,545.00Contact:LiyanJin,AssociateEngineerPhonenumber:714-741-5977Email:[email protected]:05/2024 1412EspanolAve-Montebello,CA,90640323597-10840Contractor'sLicenseA#951234CUCPID:43965,SBEDIRNo.:1000000805

Page 142 of 170 ends

16.D.

Page 234 of 593 ends

MovleBullders
CityofSantaAna
cmof'femgleCH1
Page|3
ProjectName:832—837CahuengaProject(No.2006005)Description:InstallationofPVCC—9OOWaterLine,pointofconnection,backflowpreventer,laterallineinpublicright—of-way,C900Firewaterline,doublecheckvalve,andfireconnection,newstormdraincatchbasinsandtrenchdrains,cisterntankandmechanicalskidpad,CDSunitandstormdraininlets,new6"VCPsewerlateralconnection.ContractAmount:$487,064.00Contact:CraigBabingtonPhonenumber:310—384—8494Email:[email protected]:04/2024 Address:20CivicCenterPlazaSantaAna,CA92701ProjectName:Raitt—MyrtleParkProjectDescription:Thisprojectencompassessitepreparation,demolition,grading,installationofwaterlines,stormdrainpipe,catchbasin,dropin—lets,NDSinfiltrationbasin,paving,hardscaping,andcomprehensivestreetimprovementsincludingirrigation,waterconnectionsandstormdraincatchbasin.ContractAmount:$2,776,406.00Contact:AriamVeira,SeanThomasPhonenumber:714-647-6757/714—647-5624Email:[email protected],[email protected]:03/2024 Address:9701LasTunasDriveTempleCity,CA91780ProjectName:PrimroseParkProjectDescription:Projecttasksincludesitepreparation,demolition,grading,installationofwaterdrainagepipes,in?ltrationbasin,onsitepaving,hardscaping,andotherrelatedstreetimprovementsContractAmount:$2,470,087.50Contact:OkanDemirciPhonenumber:714-319-6137Email:[email protected]:05/2022 1412EspanolAveMontebello,CA,906400323597-1084Contractor’sLicenseA#951234CUCPID:43965,SBE0DIRNo.:1000000805

Page 143 of 170 ends

16.D.

Page 235 of 593 ends

CigofOrange
rvisperas@ci‘xoforange.org
cmofPomona
HardBréject
Page|4
Address:300E.ChapmanAve.Orange,CA92866ProjectName:AnnualPipelineRenewalProject(BidNo.21-2208)Description:Mobilization,demobilization,phasing,clean-up,andobtainingpermitsandbonds.Installationof8”and12”PVCwaterpipeswithcoppertracerwire,?ttings,andappurtenances.Removalandinstallationof?rehydrants,gatevalves,air-vacassemblies,andwaterservices(1.5”and4”).Abandonmentofexistingservicesandinstallationofnewradio-readmeters.Concretecross-gutterreplacement,asphaltoverlay,andtraf?ccontrolplanswithsigns.ContractAmount:$1,366,700.00Contact:RyanVisperas(ProjectManager),ChristopherCash(PublicWorksDirector),Phonenumber:714-288-2487/714-744-5525Email:Completed:05/2023 Address:505S.GareyAve.Pomona,CA91766ProjectName:PhilandNellSotoParkDescription:InstallationofPVCdrainpipesofvarioussizes(6",8",12",and15"),installationofastandardandmodifiedcatchbasin,a15"x15”NyloplastH-lOcastirongrateandassembly,aparkwaydrain,andacastbasinfilterinsertamongotherimprovements.ContractAmount:$2,297,151.50Contact:MattPillarz/ReneGuerreroPhonenumber:909—620—3652/909-620-2261Email:[email protected]:04/2020 Ed0J.Carrillo,M.S.,P.E.ManagerC:[email protected] 1412EspanolAveMontebello,CA,906400323597-1084Contractor’sLicenseA#951234CUCPlD:43965,SBE0DIRNo.:1000000805

Page 144 of 170 ends

16.D.

Page 236 of 593 ends

C“)7‘\
EM
Pagell1412ESPANOLA VEMONTEBELLO,CALIFORNIA90640323/597-1084562/708-3586Lic.#951234 Address:26515SummitCircle,SantaClarita,CA91350-2173ProjectName:McbeanParkwayWaterMainReplacementDescription:Installationofapproximately1,700LFof12-inchDIPand100LFof8-inchDIPinMcBeanParkwayandAlegroDrive(fromOrchardVillageRoadtoDalgoDrive)andabandonmentofapproximately1,400-LFofexisting12-InchACPwatermaininplace.Alltheexistingservicelateralsand?rehydrantaretobeabandonedandreconnecttothenew12-inchDIP.approximately800LPofwaterpipeinstallationContractAmount:$1,247,030.00Contact:JosephineNgoon,P.E.SeniorEngineerPhonenumber:(661)964-3997Email:[email protected] Address:26515SummitCircle,SantaClarita,CA91350-2173ProjectName:BackcountryPumpStationPipelineDescription:installationof1,600linearfeetof24-inchductileironpipeand1,100linearfeetof16-inchductileironpipe,associated?ttingsandappurtenanceswithinthepublicright-of-way.Theworkincludes,butisnotlimitedto,mobilization,traf?ccontrol,trenchingandshoring,potablewaterpipelineinstallation,disinfection,andasphaltrepair,andallassociatedwork.ContractAmount:$2,952,855.00Contact:KevinWaugh,PEEngineerPhonenumber:(661)513.1263ext1096Email:[email protected] 1412EspanolAve-Montebello,CA,90640323597-1084Contractor'sLicenseA#951234CUCPID:43965,SBE0DIRNo.:1000000805

Page 145 of 170 ends

16.D.

Page 237 of 593 ends

oren:ll
Mre under/Benchark ntractrn
Page|2
Address:14331FrederickSt.MorenoValley,CA,92553ProjectName:MorenoValleyCityHallAnnex#1WaterMeter/ServiceConnectionDescription:ConstructionandinstallationofaWaterSupplyManifoldfortwoEasternMunicipalWaterDistrict(EMWD)watermeters,onefordomesticandoneforlandscaping,toserviceheCityofMorenoValleyCityHallBuildingAnnex#1.installationofPVCpipeforlandscapeanddomesticwaterlines,installationofnewirrigationvalves,Timercontrols,valvecoverboxes,disconnectionandcappingofanexistingdomesticwaterline,trenchingthroughconcretesidewalkandasphalt,installationofawatersupplymanifoldincludingcopperservicepipeandassociatedconnectiontoanexisting12"EMWDlineandback?llaccordingtoCityofMorenoValleyStandards.ContractAmount:$340,975.00Contact:RickyCarrilloAssociateEngineer,AraceliSahagunPhonenumber:(951)413-3155Email:[email protected],[email protected] Address:3330OceanParkBoulevard,SantaMonica,CA90405ProjectName:CrockerUmcya—425TowneApartmentsDescription:Ourscopeofworkincludestheinstallationofkeystormdrain,sewer,andirrigationsystems.Forthestormdrainsystem,weareinstalling580LFof4"PVCSDR-35stormdrainpipe,180LFof6"PVCSDR—35stormdrainpipe,and20LFof10"PVCSDR-35stormdrainpipe,allwithbeddingperprojectspecifications.Additionalstormwaterinfrastructureincludestheinstallationof10planterdrains,tworectangulardrainsbyCurb-O-Let,six24"x24"catchbasins,andten4"floordrainsbyZurnoranapprovedequalforwalkwayareas.Theconnectionpointtothebuildingisalsoincluded.Forthesewersystem,weareinstalling100LFof6”PVCSDR-35sewerpipewithbeddingasperprojectdetails.Threeconnectionpoints,eachlocated5’fromthebuildingface,willbeestablished.Additionally,houseconnectionswillbemadetotheexistingsanitarysewerlateralperLACitystandards,withprovisionsfornewconnectionsifexistinglateralsarenotsalvageable..Fortheirrigationsystem,ourworkincludescoordinatingtheinstallationofa1.5"irrigationmeterwithLADWP,installinga1.5"irrigationbackflowpreventer,andlaying15LFof1.5”irrigationwaterline.Allworkisperformedinaccordancewithprojectplans,specifications,andregulatoryrequirementsContractAmount:$245,220.00Contact:MichaelStone/SashaZarbakhshProjectEngineerPhonenumber:(310)399—1600Email:[email protected] 1412EspanolAveMontebello,CA,90640323597-1084-Contractor’sLicenseA#951234CUCPID143965,SBEDIRN0.:1000000805

Page 146 of 170 ends

16.D.

Page 238 of 593 ends

GeneralContractor:BenchmarkContractors,Inc,
uprdPré
Page|3
Address:711NewHampshireAve,LosAngeles,CA90005ProjectName:HHHNewHampshire-siteutilitiesDescription:Sewer,stormdrain,domesticwaterScopeofworkincludestheinstallationofessentialstormdrain,sewer,domesticwater,?rewater,andirrigationwatersystems.Forthestormdrainsystem,weareinstalling860LPof6"PVCSDR35pipingataminimum1%slope,alongwithareaandpatiodrainsperprojectspeci?cations.Additionally,weareconstructinga36x36OldCastleCatchBasinwithaFlogardInsertandinstallingaTorrentDrywellpermanufacturerspeci?cations.CurbdrainswillbeinstalledperAPW Astandards.Inthesewersystem,weareresponsibleforinstallinga60LF,8”sewerlateral,connectingtotheexisting8”sewermainasperoffsiteplans.Fordomesticwater,weareinstallinga6”domesticwaterlineover40LF,connectingittotheexisting6”watermain,andinstallingadomesticwaterback?owpreventer.The?rewatersysteminstallationincludes140LPof4”?rewaterlineconnectedtotheexisting6”main,installationofFDCsandapostindicatorvalveasper?reconsultantplans,alongwithadoublecheckdetector.Additionally,58existing?rewaterlineswillbeabandoned.Ourirrigationwaterscopeincludesinstalling31LFofirrigationlineperlandscapeplans,connectingtotheexisting6”watermain,andinstallinga1”FEBCOLF825Y Airrigationback?owpreventer.Allworkisperformedinaccordancewithprojectspeci?cationsandcoordinatedwithothersiteimprovements.ContractAmount:$468,500.00Contact:KatieMasonPhonenumber:(310)382-8445Email:[email protected] Ed0J.Carrillo,M.S.,P.E.jectManagerC:562—[email protected] 1412EspanolAveMontebello,CA,90640323597-10840Contractor’sLicenseA#951234CUCPID:43965,SBE0DIRNo.:1000000805

Page 147 of 170 ends

16.D.

Page 239 of 593 ends

nsiructionCore.

Conslvuction6019.

JesusEduardoCarrilloIPresidentandTreasurerEmigdioCarrilloIVicePresidentandSecreiau TheChairpersonled meetingcopyWaiverofNoticeofMeexlngwhig!ofsheDirectorsoftheCorgoracionree ecuisanadvishaiitwasappropriaieloaulhnrizeeexecutionand JesusEguardoCarrillo
esusiuardo
WEmigdioC o
MinutesoftheBoardofDirectorsMeetingOfGEMCoTheannualmeetingoftheBoardofDirectorsofCEM (the"Corporation“)washeldon15""dayofMay2020.immediatelyfollowingtheannualmeetingofthedirectorsoftheCorporation.Therepresentatthemeeting BeingallthemembersoftheBoardofDirectorspresentothea ofa ohhadagdtoexd edt thperformancethereofbytheCorporation.Uponmotiondulymade.secondedandunanimouslycarried,itwasRESOLVED.thatthechairmanberequestedtocausethesametobespreadatlengthupontheminutes.ThemeetingthenproceededtoAUTHORIZEFOLLOWINGPERSONNELSTOSIGNONANYBIDPROPOSALorCONTRACTUALDOCUMENTSONBEHALFOFCEMCONSTRUCTIONCORP.untiltheirsuooessorsareelectedandqualify:President:ThePresidentthenpresentedandreadminutesoftheannualmeetingofDirectorsofthisCorporation,andthesamewere.onmotiondulymade,secondedandunanimouslycarried.inallrespectsrati?edandadoptedbythisBoardofDirectors.Therebeingnofurtherbusinesstocomebeforethemeeting.uponmotiondulymade.Secondedandunanimouslycarried.themeetingwasadjourned.iNWITNESSWHEREOF,IhaveexecutedmynameasSecretaryandhavehereuntoaf?xedthecorporatesealoftheabovenameCorporationthis15‘“dayofMay2020.Dated:05/15/2020 CarrilloPresidentandTreasurer
A
VicePresidentandSecretary
(Seal)

Page 148 of 170 ends

16.D.

Page 240 of 593 ends

NO. DESCRIPTION
FURNISH AND INSTALL 10" PVC C-900, CLASS 200 WATER MAIN1 TRENCH, BACKFILL AND PROVIDE TEMPORARY PAVEMENT PER DETAIL 1 ON SHEET 8, AND THE C.O.H. STD. NO. ST-110 THRU ST-110C

NOT USED
2 3
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
FURNISH AND INSTALL 10" 45° ELBOW (P.O. x P.O.), RESTRAIN ALL JOINTS FURNISH AND INSTALL 10" 90° ELBOW (P.O. X P.O.), RESTRAIN ALL JOINTS REMOVE AND REPLACE EXISTING DRIVEWAY PER C.O.H. STD. NO. C-208, C-209 AND C-210;

MATCH EXISTING GRADE
REMOVE AND REPLACE EXISTING CURB RAMP PER C.O.H. STD. NO. C-216A, MATCH EXISTING GRADE
REMOVE AND REPLACE EXISTING CROSS GUTTER PER C.O.H. STD. NO. C-213 FURNISH AND INSTALL WATER MAIN SUPPORT PER DETAIL 2 ON SHEET 8 FURNISH AND INSTALL 2" BLOW-OFF VALVE ASSEMBLY

BREAK THROUGH CHANNEL WALL TO INSERT PIPE THROUGH AND RECONSTRUCT PER DETAIL 3 ON SHEET 8
FURNISH AND INSTALL 10" CL 52, D.I. WATER MAIN LINE TYTON PUSH-ON JOINTS REMOVE AND REPLACE SIDEWALK PER C.O.H. STD. NO. C-211, C-215, MATCH EXISTING GRADE REMOVE AND REPLACE CURB & GUTTER PER C.O.H. STD. NO. C-201, MATCH EXISTING GRADE

ADJUST WATER VALVE TO FINISH SURFACE
FURNISH AND INSTALL 2" AIR VALVE PER C.O.H. STD. NO. W-703. REPAIR ALL LANDSCAPING AND HARDSCAPING REMOVED OR DAMAGED DURING INSTALLATION.

FURNISH AND INSTALL 10" RESTRAINED STEEL BLIND FLANGE
FURNISH AND INSTALL WATER MAIN DROP FLUSHER ASSEMBLY PER C.O.H. STD. NO. W-717 CONSTRUCT THRUST BLOCK PER COH STD NO. W-706
FURNISH AND INSTALL 12" PVC C-900, CLASS 200 WATER MAIN FURNISH AND INSTALL 12"x12"x8"x8" D.I. FLANGED CROSS
FURNISH AND INSTALL 12" RSGV, (FL X FL) W/ RESTRAINS
FURNISH AND INSTALL 12" TRANSITION COUPLING

REMOVE EXISTING WATER VALVE AND DELIVER TO CITY YARD

PLUG EXISTING WATERLINE
SLURRY BACKFILL & ABANDON IN PLACE EXISTING 8" WATER MAIN PER AWWA C400 & OSHA 1926.1101
FURNISH AND INSTALL WATER SERVICE CONNECTION PER C.O.H. STD. NO. W-701, W-701A, W-701B, W-701C, & W-701D.

REMOVE EXISTING HYDRANT AND FURNISH AND INSTALL NEW FIRE HYDRANT PER C.O.H. STD.

NO. W-700, W-700A, W-700B & W-702, 6" LATERAL
FURNISH AND INSTALL 12"X12"X12" D.I. FLANGED TEE
FURNISH AND INSTALL 8" PVC C-900, CLASS 200 WATER MAIN
FURNISH AND INSTALL 8" RSGV, (FL X FL) W/ RESTRAINS
FURNISH AND INSTALL 8" TRANSITION COUPLING

REMOVE EXISTING WATER MAIN

RELOCATE TRAFFIC CONTROL BOX
FURNISH AND INSTALL 6" RSGV, (FL X FL) W/ RESTRAINS
FURNISH AND INSTALL 12"X12"X6" D.I. FLANGED TEE
REMOVE EXISTING REDUCER, FURNISH AND INSTALL 12"X8" REDUCED 3,250
EST. QTY
2,370 LF
1 EA
2 EA
2 27
550
1 3
2 6
7 390
5 2
1 200
2 330
1 2
80 LF
390 SF
75 LF
EA
EA
LF
EA
EA
EA
EA
EA
LF
EA
EA
EA
LF
EA
LF
EA
EA
N.A. N.A.
7E A
18 EA
3E A
620 SF
1E A
160 SF
4E A
1 EA
2 EA
2 EA
4 FURNISH AND INSTALL 10" 11.25° ELBOW (P.O. x P.O.), RESTRAIN ALL JOINTS 3 EA
2 EA
1 EA
LF
1 CITY OF HEMET
2024/2025 RAW WATER - TREATED WATER

PIPELINE FOR TREATMENT PLANT
CIP 2415

1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS FOR THE

IMPROVEMENTS OF DEVELOPMENT WITHIN THE CITY OF HEMET IN ACCORDANCE WITH CITY OF HEMET ORDINANCES AND STANDARDS.

2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SECURE ALL PERMITS REQUIRED BY THE CITY OF HEMET.

3. A 72-HOUR NOTICE IS REQUIRED PRIOR TO PUBLIC WORKS INSPECTIONS CALL INSPECTION REQUEST LINE (951) 765-3860. IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO NOTIFY THE PUBLIC WORKS DEPARTMENT IN ADVANCE, PRIOR TO THE

CONCEALING OF EACH PHASE OF WORK SO THAT THE CONSTRUCTION INSPECTOR CAN INSPECT THE WORK BEING DONE.

4. COMPACTION OF BACKFILL TO BE A MINIMUM 90% RELATIVE COMPACTION FROM THE BOTTOM OF THE AGGREGATE BASE TO THE TOP OF THE PIPE ZONE. MATERIAL IN THE PIPE ZONE IS TO BE INSTALLED PER PVC PIPE MANUFACTURERS SPECIFICATIONS.

AGGREGATE BASE COURSE IS TO BE COMPACTED TO 95% RELATIVE COMPACTION AS PER THE SOIL REPORT RECOMMENDATIONS. CONTRACTOR SHALL NOTIFY CITY 48-HOURS

PRIOR TO COMPACTION TESTING

5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO TEMPORARILY PATCH ALL UTILITY TRENCHES WITHIN EXISTING PAVED STREETS. THE TEMPORARY PATCH SHALL BE REMOVED AND REPLACED WITH A PERMANENT PATCH AT THE TIME OF A.C. SURFACING PER CITY OF HEMET STD. NO. ST-110A AND ST-110B.

6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT FROM DAMAGE ANY

UTILITY OR OTHER APPURTENANCE THAT IS TO REMAIN IN PLACE, BE INSTALLED, RELOCATED OR OTHERWISE REARRANGED.

7. EXISTING UTILITY DEPTH AND SEPARATION ARE BASED ON ESTIMATED DEPTHS. IT SHALL

BE THE RESPONSIBILITY OF THE CONTRACTOR TO POTHOLE FOR LOCATION AND DEPTH

OF ALL EXISTING UTILITY CROSSINGS PRIOR TO THE START OF WATER LINE CONSTRUCTION. CONTRACTOR SHALL NOT PERFORM ANY CONSTRUCTION WORK UNTIL

ALL POTHOLING IS COMPLETE AND VERIFY THE PROPOSED WORK WILL NOT CAUSE CONFLICTS WITH EXISTING UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR FOR ALL CHANGES MADE DUE TO THE FAILURE OF POTHOLING AND VERIFYING EXISTING UTILITY CROSSINGS WITH THE CITY.

8. THE CONTRACTOR WILL HOLD HARMLESS, INDEMNIFY AND DEFEND THE CITY OF HEMET,

THE OWNER, THE ARCHITECT, THE ENGINEER AND HIS CONSULTANTS, AND EACH OF

THEIR OFFICERS AND EMPLOYEES AND AGENTS, FROM ANY AND ALL LIABILITY CLAIMS,

LOSSES OR DAMAGE ARISING OR ALLEGED TO ARISE FROM THE PERFORMANCE OF WORK

DESCRIBED HEREIN, BUT NOT INCLUDING THE SITE NEGLIGENCE OF THE CITY OF HEMET,

THE OWNER, THE ARCHITECT, THE ENGINEER AND HIS CONSULTANTS, AND EACH OF THEIR OFFICERS AND EMPLOYEES AND AGENTS.

9. THE FINAL PAVING COURSE FOR ROAD MIX AND A.C. SURFACE STREETS SHALL BE ONE TENTH OF A FOOT (0.1') IN THICKNESS AND A MINIMUM OF EIGHT FEET (8') IN WIDTH OR

AS WIDE AS NECESSARY TO COVER ALL BREAK-OUTS AND OVERLAP EXISTING PAVEMENT TWO FEET (2') ON EITHER SIDE OF TRENCH, WHICHEVER IS THE GREATER. THIS

REQUIREMENT ALSO APPLIES TO PAVING TIE-INS TO NEW CURBS AND GUTTER FROM AN

EXISTING STREET (IN SOME INSTANCES, IT WILL BE NECESSARY TO OVERLAY A MINIMUM OF ONE-HALF THE STREET TO OBTAIN THE PROPER TIE-IN TO NEW CURB AND GUTTER.

THE AMOUNT OF SUCH OVERLAY SHALL BE DETERMINED IN THE FIELD BY THE PUBLIC WORKS INSPECTOR. THE FINAL PAVING COURSE SHALL BE LAID WITH A SELF-PROPELLED

MECHANICAL SPREADING AND FINISHING MACHINE EQUIPPED WITH TAMPER BARS AND AUTOMATIC SCREED (BARBER GREEN OR APPROVED EQUAL).

10. ALL STREET AND PARKING LOT SUBGRADE MATERIAL AND A.B. MATERIAL SHALL BE COMPACTED TO 95% DENSITY FOR THE TOP 12". BASE "R" VALUES SHALL BE OBTAINED PRIOR TO THE PLACEMENT OF ANY AGGREGATE BASE MATERIAL.

11. ASPHALT CONCRETE PAVING SHALL COMPLY WITH SECTION 203-1 OF THE STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION, CURRENT EDITION.

12. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA 811, 48 HOURS PRIOR TO ANY EXCAVATION.

13. ALL CONNECTIONS MUST HAVE RESTRAINTS OR RESTRAINED FITTINGS 40 FEET FROM

FITTING

14. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, ANGLES, AREAS, HEIGHTS, ELEVATIONS, AND RADII ON THE PLANS. EXISTING CONDITIONS, WHICH ARE

CONTRARY TO THOSE SHOWN ON PLANS, SHALL BE VERIFIED WITH THE CITY ENGINEER BEFORE PROCEEDING WITH WORK.

15. ALL WORK SHALL CONFORM TO THE PLANS AND SPECIFICATIONS IN ALL RESPECTS AND SHALL BE SUBJECT TO APPROVAL OF THE CITY ENGINEER.

16. ALL AVAILABLE RECORDS OF THE CITY AND UTILITY COMPANIES INVOLVED HAVE BEEN INVESTIGATED AND ALL KNOWN SUBSTRUCTURES ARE SHOWN. HEREON THE

CONTRACTOR SHALL EXERCISE EXTREME CARE DURING EXCAVATION AND DURING THE

COURSE OF THE PROJECT TO PREVENT DAMAGE TO EXISTING UNDERGROUND AND ABOVE GROUND UTILITIES AND IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR TO LOCATE ALL SUBSTRUCTURES WHETHER ON THE PLANS OR NOT, AND PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR THE TOTAL

EXPENSE OF REPAIR OR REPLACEMENT OF SAID SUBSTRUCTURE BY THIS OPERATION IN CONNECTING WITH THE PROSECUTION OF THIS WORK.

17. ALL CONFLICTING IMPROVEMENTS, UTILITIES AND MATERIALS SHALL BECOME THE

PROJECT LIMITS BY THE CONTRACTOR AT NO COST TO THE CITY, UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS.

18. THE CONTRACTOR SHALL PROTECT ALL EXISTING CITY TRAFFIC AND STREET NAME SIGNS AND SHALL REPLACE ANY DAMAGED SIGN AT NO COST TO THE CITY.

19. ALL SEWER, WATER AND UTILITY TRENCH AND REPAVED SHALL BE PER CITY OF HEMET STANDARD ST-110, ST-110A, AND ST-110B.

20. ALL BASE SHALL BE CLASS 2 CRUSHED AGGREGATE BASE ONLY. NO RECLAIMED OR MISCELLANEOUS MATERIALS ALLOWED.

21. ALL WATER LINE CONSTRUCTION SHALL BE INSPECTED AFTER THE INSTALLATION WITH A MOBILE TELEVISION INSPECTION UNIT AT THE CONTRACTOR'S EXPENSE. VIDEO LOGS SHALL BE USB DRIVE IN MP4 FORMAT OR APPROVED EQUAL SUBMITTED TO THE PUBLIC

WORKS DEPARTMENT FOR REVIEW PRIOR TO THE APPROVAL OF THE FACILITIES

22. WATER INSTALLATION AND CONSTRUCTION SHALL COMPLY WITH REQUIREMENTS OF

STANDARDS OR SPECIFICATIONS FOR WATER SYSTEMS FILED IN THE CITY OFFICES, CITY OF HEMET WATER MAINS SHALL BE LOCATED 7' FROM THE CURB OR AS SHOWN ON PLANS.

23. ALL WATER SEPARATIONS REFER TO STATE OF CALIFORNIA HEALTH DEPARTMENT

REQUIREMENTS

24. WATER MAIN MUST REMAIN IN SERVICE UNTIL NEW WATER MAIN AND SERVICES CAN BE

OUT IN PLACE

25. THE CONTRACTOR SHALL REPLACE ALL SIGNING AND STRIPING DISTURBED OR

DESTROYED DURING CONSTRUCTION

26. CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTORS PERFORMING WORK IN THE AREA DURING THE CONSTRUCTION. THIS SHALL INCLUDE, BUT NOT LIMITED TO, THE CONTRACTOR PERFORMING WORK ON THE CITY OF HEMET'S CIP 2406

27. CONTRACTOR SHALL SUBMIT AN INGRESS AND EGRESS PLAN FOR APPROVAL PRIOR TO THE START OF ANY WORK. THE PLAN SHALL INCORPORATE THE FOLLOWING a. PIPELINE AND APPURTENANCES TO BE CONSTRUCTED OUT OF FLOWLINE OF THE

CHANNEL
b. CONTRACTOR SHALL UTILIZE THE CHANNEL ACCESS FOR INGRESS AND EGRESS OF

THE CHANNEL PRISM
c. CONTRACTOR SHALL ENSURE REMOVAL OF ALL EQUIPMENT AND MATERIALS AT

THE END OF EVERYDAY FROM CHANNEL PRISM
d. CONTRACTOR SHALL REPLACE IN KIND OF ANY REMOVAL OF EXISTING CONCRETE

OR MATERIAL OF THE CHANNEL DURING CONSTURCTION

28. CLSM BACKFILL SHALL BE USED OVER STORM DRAIN PIPE AND LATERALS WATER GENERAL NOTES WATER GENERAL NOTES CONT.

CITY OF HEMET BOUNDARY

SAN DIEGO
CANAL

DOMENIGONI
PKWY

N SAN JACINTO
ST

STATE ST

LOCATION MAP

INDEX MAP
N

SHEET INDEX
SHEET 1 TITLE SHEET
SHEET 2 JOHNSTON AVE
FROM TREATMENT PLANT TO STA 14+50
SHEET 3 JOHNSTON AVE
FROM STA 14+50 TO STA 18+00
SHEET 4 KIRBY ST
FROM STA 18+00 TO STA 23+00
SHEET 5 KIRBY ST
FROM STA 23+00 TO STA 28+50
SHEET 6 KIRBY ST
FROM STA 28+50 TO WELL #16
SHEET 7 JOHNSTON AVE
FROM STA 50+00 TO TREATMENT PLANT

MERCED WAY

FROM BEDFORD AVE TO JOHNSTON AVE
SHEET 8 DETAILS
N

NOTIFICATIONS

CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITY COMPANIES AND AGENCIES AT LEAST 48 HOURS PRIOR TO COMMENCING CONSTRUCTION.

CITY OF HEMET (951) 765-3712
CITY OF SAN JACINTO (951) 487-7342
EASTERN MUNICIPAL WATER DISTRICT (951) 928-3777, EXT. 4830 SOUTHERN CALIFORNIA GAS COMPANY 811
VERIZON TELEPHONE COMPANY 811
SOUTHERN CALIFORNIA EDISON COMPANY 811
UNDERGROUND SERVICE ALERT 811
N.T.S.

N.T.S.

VICINITY MAP
N
N.T.S.

TITLE SHEET

DOMENIGONI
PKWY

W FLORIDA
AVE

WINCHESTER
RD

N SAN JACINTO
ST

STATE ST

STETSON
AVE

DEVONSHIRE
AVE
MENLO
AVE

CHARLTON
AVE

PARKAVE

ESPLANADE
AVE
KIRBY
ST

SANDERSON
AVE

CAWSTON
AVE
PALM
ST

PROJECT

LOCATIONS

STETSON
AVE
SEE SHEETS 6

JOHNSTON
AVE
ROSE
AVE
SILVER

OAK WAY
SEVEN

HILLS DRKIRBY
ST

MERCEDWAY
8 RAW WATER PIPELINE FOR

TREATMENT PLANT
2415
C:\Users\DJaimes\OneDrive - City of Hemet\Engineering\CIP\2024 PROJECTS\2415 - 24-25 Raw Water-Treated Water Pipeline for Treatment Plant\DESIGN\CADD\Sheets\Plans\2415_G-1 9/25/2025 7:42 AM

OF SHEETS
FILE NO.
445 E. FLORIDA AVENUE
HEMET, CA 92543
(951) 765-2360
EA# E#
NGS DATASHEET "PID DX5343",
DESIGNATION "DVR 31"
ELEVATION (NAVD 88) = 1535.44'
SCALE:

DATE:

BENCHMARK:

DATE:

REVIEWED BY: APPROVED BY:

NOAH RAU, RCE 74686

PUBLIC WORK DIRECTOR
DATE:DESIGNED BY: DRAWN BY: CHECKED BY:

DATE:

REVISIONS:

NO: BY:

CITY ENGINEERAS SHOWN
DJ DJ
1-800-227-2600 OR 811

UNDERGROUND SERVICE ALERT
Call: TOLL FREE

TWO FULL WORKING DAYS

BEFORE YOU DIG
TH

TRAVIS HOLYOAK

WATER/WASTEWATER SUPERINTENDENT
SEE SHEETS 5
SEE SHEETS 4
SEE SHEETS 3
SEE SHEETS 2
SEE SHEETS 7
09/25/2025
09/25/2025

Page 149 of 170 ends

16.D.

Page 241 of 593 ends

1 Project No. 2415

CONTRACTOR AGREEMENT
By and Between
The City of Hemet,
a California municipal corporation
and
Giles Engineering
a California corporation
AGREEMENT # 2026-037

Page 150 of 170 ends

16.D.

Page 242 of 593 ends

2 Project No. 2415

CITY OF HEMET BID AND CONTRACT DOCUMENTS
CITY OF HEMET CONTRACTOR AGREEMENT # 2026-037
2024/25 Raw Water - Treated Water Pipeline for Treatment Plant - CIP 2415 This City of Hemet Contractor Agreement (“Agreement”) is made and entered into for the above referenced Project by and between the City of Hemet (“Agency”), and Giles Engineering (“Contractor”) on the 13th day of November, 2025.

In consideration of the mutual covenants and agreements set forth herein, Agency and Contractor have mutually agreed as follows:

1. CONSTRUCTION
The Contractor agrees to do all the Work in connection with the 2024/25 Raw Water - Treated Water Pipeline for Treatment Plant - CIP 2415 to be constructed at Kirby St from Stetson Ave to Johnston Ave and Johnston Ave from Kirby St to Merced Way, in the City of Hemet, California, including to furnish any and all labor, services, materials and equipment to construct and complete the Project, and appurtenant work in connection therewith, said work to be done and materials to be furnished in strict conformity with the Contract Documents, including but not limited to this Agreement, approved Change Orders, Notice Inviting Bids, Instructions to Bidders, Bidder’s Proposal and Information Required for Bid Submittal, Bid Schedules, Addenda and/or Bulletins, plans, Special Provisions (Specifications), General Conditions, General Provisions, Greenbook 2018 as amended and supplemented, technical references, all other referenced documents, all codes, permit conditions and regulations, for the total amount(s) and any unit prices and additive/deductive items, including all work, labor, services, materials and equipment described and reasonably inferable from documents enumerated in Exhibit “A” attached hereto and incorporated herein by reference (such construction and furnishing of labor, service, materials and equipment hereinafter referred to as the “Work”) in a good workmanlike manner according to any and all applicable best practices to the satisfaction of the Agency. The term Contract Documents shall mean this Agreement, and all of the items enumerated in Exhibit “A” and all change orders or addenda issued by the Agency with respect thereto. Agency must consent in writing to any changes in the scope of Work. Exhibit “A” shall be deemed revised in accordance with any revisions for which Agency’s consent has been issued. Any revisions to the scope of Work for which Agency’s written consent has not provided shall be null and void and done at the risk and sole expense of the Contractor.

2. CONTRACT PRICE
Agency hereby agrees to pay and the Contractor agrees to accept as full compensation for all Work performed in accordance with these Contract Documents the Contract Price as set forth in Exhibit “B”, Contract Price, attached hereto and incorporated herein by reference. Payments to the Contractor shall be made in the manner described in the Special Provisions.

Page 151 of 170 ends

16.D.

Page 243 of 593 ends

3 Project No. 2415

3. TIME FOR PERFORMANCE
a) Time is of the essence in Contractor’s performance of the Work for this Agreement. Contractor agrees to diligently pursue the performance and completion of the Work in every detail to the satisfaction of the Agency, exclusive of maintenance periods, within the specified duration set forth in the Notice to Proceed. All timing requirements shall be strictly adhered to unless otherwise modified by the Agency in accordance with the Bid and Contract Documents. If Contractor
b) The Parties estimate that performance of this Agreement will not exceed the Not to Exceed Amount. Contractor shall notify the Agency in writing whenever it has reason to believe that the costs the Contractor expects to incur under this Agreement in the following sixty (60) days, when added to all costs previously incurred, will exceed eighty percent (80%) of the Maximum Amount specified herein. As part of the notification, the Contractor shall provide the Agency a revised estimate of the total cost of performing this Agreement.

4. DELAYS AND EXTENSIONS OF TIME
Delays and extensions of time will be handled by Agency and Contractor pursuant to the provisions of Section 6-4 of the Special Provisions. However, Contractor must comply with the written notice requirement, as well as timely report back-up information, in strict compliance with the requirements of the provisions of Section 6-4 of the Special Provisions; Contractor’s failure to submit these items within the times specified will constitute a waiver of the extension of time and payment for delay and will be ground for refusal by the Agency to consider such request.

5. LABOR CODE REQUIREMENTS
Pursuant to Labor Code Section 1771.1, the Contractor and all subcontractors shall be registered with the Department of Industrial Relations. Pursuant to Labor Code Section 1771.4, the Contractor is hereby notified that this Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor, and any subcontractor engaged by Contractor, must pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records.

Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor may forfeit as a penalty to City up to $50.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate.

Page 152 of 170 ends

16.D.

Page 244 of 593 ends

4 Project No. 2415
Contractor acknowledges and agrees to abide by the provisions of California Labor Code §§ 1720, et seq., as well as 1771, 1773, 1773.1, 1773.2, 1773.6, 1773.7, 1774, 1775 1776 and 1777, pertaining to the obligation to pay prevailing wages with respect to the performance of work (“Prevailing Wage Laws”). Contractor shall defend, indemnify, and hold the City, its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

Contractor acknowledges that under California Labor Code sections 1810 et seq., eight hours of labor constitutes a legal day’s work. Contractor will forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. (Labor Code § 1813.)

6. NON-DISCRIMINATION
Contractor, its officers, agents, employees, and subcontractors may not discriminate in the employment of persons to perform the Work because of the race, religion, creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex or age of such person, except as may be permitted by California Government Code section 12940. Contractor is responsible for compliance with this section.

7. AUTHORIZED AGENCY REPRESENTATIVES
On behalf of the Agency, the City Engineer of the City of Hemet shall be the Agency’s authorized representative in the interpretation and enforcement of all Work performed in connection with this Agreement. The City Engineer may delegate authority in connection with this Agreement to his/her assigned designees.

8. INDEMNIFICATION
Contractor shall indemnify, defend with legal counsel approved by Agency, and hold harmless Agency, its officers, officials, employees, and volunteers (“Indemnified Parties”) from and against all claims for and actual liabilities, losses, damages, expenses, costs (including without limitation reasonable attorney’s fees, expert fees, and all other costs and fees of litigation) of every nature relating to, arising out of or in connection with Contractor’s, its officers, agents, employees, or subcontractors (or any agency or individual that Contractor shall bear the legal liability thereof) negligence, recklessness or willful misconduct in the performance of work on and/or connected with the Project or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the Indemnified Parties. Should conflict of interest principles preclude a single attorney from representing both Agency and Contractor, or should Agency otherwise find Contractor’s attorney unacceptable, then Contractor shall reimburse the Agency its costs of defense, including without limitation reasonable attorney’s fees, expert fees, and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the Indemnified Parties with respect to claims determined by a trier of fact to have been the

Page 153 of 170 ends

16.D.

Page 245 of 593 ends

5 Project No. 2415
result of the Contractor’s negligent, reckless, or wrongful act, omission or performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

Contractor’s obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by Indemnified Parties.

However, without affecting the rights of Indemnified Parties under any provision of this Agreement, Contractor shall not be required to indemnify and hold harmless Indemnified Parties for liability attributable to the sole or active negligence or willful misconduct of Indemnified Parties, provided such sole or active negligence or willful misconduct is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where Indemnified Parties are shown to have been solely or actively negligent or to have acted with willful misconduct and where Indemnified Parties’ sole or active negligence or willful misconduct accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the sole or active negligence or willful misconduct of Indemnified Parties.

9. CLAYTON AND CARTWRIGHT ACT ASSIGNMENTS. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract for the Project, Contractor and any or subcontractor is deemed to have offered and agreed to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Project. This assignment will be deemed made and will become effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.

10. INSURANCE
Contractor agrees to have and maintain in full force and effect during the term of this Agreement the insurance coverages listed in Exhibit “C” (“Insurance”), which is made a part of this Agreement.

Further, by signing below Contractor certifies that he/she/it is aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work of this Agreement. Additionally, Contractor shall require each subcontractor to comply with the requirements of Section 3700 of the Labor Code, including requiring each subcontractor to execute the following certification:
“I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for worker’s

Page 154 of 170 ends

16.D.

Page 246 of 593 ends

6 Project No. 2415
compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Agreement.”

11. ENTIRE AGREEMENT; CONFLICT
The Contract Documents comprise the entire agreement between the Agency and the Contractor with respect to the Work. In the event of conflict between the terms of this Agreement and the bid of the Contractor, then this Agreement shall control and nothing herein shall be considered as an acceptance of the terms of the bid conflicting herewith.

12. PROJECT DOCUMENTATION
All data, drawings, maps, models, notes, books, documents, papers, daily reports, schedules, time and materials tickets, employee time sheets, accounting records and other evidence pertaining to costs incurred, photographs, reports, studies and other documents (collectively, “Project Documents”) prepared, developed or discovered by Contractor in the course of performing any of the Work under this Contract will become the sole property of City. Upon the expiration or termination of this Contract, Contractor must turn over all original Project Documents to City in its possession, but may retain copies of any of the Project Documents it may desire.

Contractor shall maintain the Project Documents and shall make such materials available at its office at all reasonable times during the term of this Agreement and for three (3) years from the date of final payment under this Agreement any documents not turned over to Agency for inspection by Agency.

13. FALSE CLAIMS
Contractor acknowledges that if a false claim is submitted to the Agency, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the Agency seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years.

I have read and understood all of the provisions of this Section 13, above:

(Contractor Initials) (Contractor Initials)

Page 155 of 170 ends

16.D.

Page 247 of 593 ends

7 Project No. 2415

14. INDEPENDENT CONTRACTOR
Contractor is and will at all times remain as to City a wholly independent contractor and shall not be an employee, agent, partner or joint venture of the Agency. Agency shall have the right to control Contractor insofar as the results of Contractor’s services rendered pursuant to this Agreement; however, Agency shall not have the right to control the means by which Contractor accomplishes such services. Neither the City nor any of its officers, employees, or agents will have control over the conduct of Contractor or any of Contractor’s officers, employees, agents or subcontractors, except as expressly set forth in the Contract Documents. Contractor may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of City.

15. LICENSES AND PERMITS
Contractor must, at Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, and give all necessary notices and pay all fees and taxes required by law, including, without limitation, any business license tax imposed by City. Contractor represents and declares to Agency that it has all licenses, permits, qualifications and approvals of whatever nature which are legally required to practice its profession. In performing the Work, Contractor must comply with all applicable statutes, laws and regulations, including, but not limited to, OSHA requirements and the Hemet Municipal Code.

16. GENERAL PROVISIONS
a) Authority to Execute. Each Party represents and warrants that all necessary action has been taken by such Party to authorize the undersigned to execute this Contract and to bind it to the performance of its obligations.
b) Assignment. Contractor may not assign this Contract without the prior written consent of City; which consent may be withheld in the City’s sole discretion since the experience and qualifications of Contractor were material considerations for this Contract. c) Binding Effect. This Agreement is binding upon the heirs, executors, administrators, successors and permitted assigns of the Parties. d) Integrated Contract. This Contract, including the Contract Documents, is the entire, complete, final and exclusive expression of the Parties with respect to the Work to be performed under this Contract and supersedes all other agreements or understandings, whether oral or written, between Contractor and City prior to the execution of this Contract. e) Modification of Contract. No amendment to or modification of this Contract will be valid unless made in writing and approved by Contractor and by the City Council or City Manager, as applicable. The Parties agree that this requirement for written modifications cannot be waived and that any attempted waiver will be void.

Page 156 of 170 ends

16.D.

Page 248 of 593 ends

8 Project No. 2415
f) Counterparts and Facsimile Signatures. This Contract may be executed in several counterparts, each of which will be deemed an original, and all of which, when taken together, constitute one and the same instrument. Amendments to this Contract will be considered executed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will have the same effect as an original signature. g) Waiver. Waiver by any Party of any term, condition, or covenant of this Contract will not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Contract will not constitute a waiver of any other provision, or a waiver of any subsequent breach or violation of any provision of this Contract. Acceptance by City of any Work performed by Contractor will not constitute a waiver of any of the provisions of this Contract.
h) Interpretation. This Contract will be interpreted, construed and governed according to the laws of the State of California. Each party has had the opportunity to review this Contract with legal counsel. The Contract will be construed simply, as a whole, and in accordance with its fair meaning. It will not be interpreted strictly for or against either party. i) Severability. If any term, condition or covenant of this Contract is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Contract will not be affected and the Contract will be read and construed without the invalid, void or unenforceable provision. j) Venue. In the event of litigation between the Parties, venue in state trial courts will be in the County of Riverside. In the event of litigation in a U.S. District Court, venue will be in the Central District of California, in Riverside.
[Signature Page Follows]

Page 157 of 170 ends

16.D.

Page 249 of 593 ends

9 Project No. 2415
IN WITNESS WHEREOF this Agreement is executed as of the date first written above.

AGENCY:

City of Hemet
By:

Mark Prestwich, City Manager
CONTRACTOR:

Giles Engineering
By:

Name:

Its:

By:

Name:

Its:

ATTEST:

By:

John Maier, City Clerk Contractor’s City Business License No.

APPROVED AS TO FORM:

By:

Steven Graham, City Attorney
State Contractor License No. & Class
DIR Registration No. & Exp
Street Address
City, State, Zip Code
[NOTE: In the event the Contractor is a corporation, the signatures of two separate persons holding different offices must be provided. Contractor signatures shall be duly notarized, and appropriate attestations shall be included as may be required by the bylaws, article of incorporation, or other rules or regulations applicable to Contractor’s business entity.]

Page 158 of 170 ends

16.D.

Page 250 of 593 ends

EXHIBIT A

CONTRACT DOCUMENTS

1. City of Hemet Contractor Agreement

2. Change Orders issued by Agency, signed by Contractor and (if necessary) approved by City Council

3. Notice Inviting Bids, Instructions to Bidders, and Bidder’s Proposal and Information Required for Bid Submittal

4. Bid Schedule(s)

5. Addenda and/or Bulletins

6. Plans

7. Special Provisions (Specifications)

8. General Conditions

9. General Provisions Standard Specifications for Public Works Construction (“Greenbook”) 2024 edition as amended and supplemented

10. State Standard Specifications

11. State Standard Plans

12. Permits issued by jurisdictional regulatory agencies

13. Electric, gas, telephone, and cable television company specifications and standards

14. Notice of Award

15. Notice to Proceed

16. Certificate(s) of Required Insurance and Worker’s Compensation Insurance

17. Security for Payment (Labor & Materials) and Performance

18. Escrow Agreement for Security Deposits in Lieu of Retention If there is a conflict between any of the Contract Documents, the documents highest in precedence shall control. The order of precedence of the Contract Documents shall be as provided in Section 3-7.2 of the Special Provisions. Detail drawings shall take precedence over general drawings.

Page 159 of 170 ends

16.D.

Page 251 of 593 ends

EXHIBIT B

CONTRACT PRICE
Not to Exceed Nine Hundred and Twenty-Nine Thousand Ninety Dollars and Eighty-Nine Cents ($929,090.089)
The Contract Price for performing all Work described in the Contract Documents, including labor, materials, services and equipment is the total amount of all lump sum items and of all unit price sums, determined by multiplying the unit price for each item times the actual quantity of each such item, as determined by the Agency.

Page 160 of 170 ends

16.D.

Page 252 of 593 ends

EXHIBIT C

INSURANCE

1.General Requirements. Contractor must procure and maintain in full force and effect during the term of this Contract the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:

Type of Insurance Limits
Commercial General Liability $5,000,000 per occurrence/$10,000,000 general aggregate
Business Automobile Liability $5,000,000 combined single limit Workers’ Compensation/Employers $1,000,000 per accident or disease Liability
Surety Bonds As described below
Contractors’ Pollution Legal Liability $2,000,000 per occurrence/$4,000,000 general aggregate
If the contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specific minimum limits of insurance and coverage shall be available to the City.

2.Commercial General Liability Insurance. Coverage shall be at least as broad as Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. City and its officers, officials, employees, volunteers, and agents shall be included as additional insured. Coverage shall be primary as respects the City, and any insurance or self-insurance maintained by the City shall not be required to contribute.

3.Business Auto Coverage. Coverage shall be at least as broad as Insurance Services Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage. If Contractor or Contractor’s employees will use personal autos in any way on this Project, Contractor must provide evidence of hired and non-owned auto liability coverage.

4.Workers’ Compensation. Insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

Page 161 of 170 ends

16.D.

Page 253 of 593 ends

5.Surety Bonds. Contractor shall provide the following Surety Bonds: (1) Bid bond, (2) performance bond, (3) payment bond, and (4) maintenance bond. The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.

6.Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate. Contractor shall maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Contract.

7.Other Insurance. Contractor may be required to obtain such other insurance coverage as may be required by applicable law or by the City.

8.Excess or Umbrella Liability Insurance (Over Primary). If an excess or umbrella liability policy is used to meet limit requirements, the insurance must provide coverage at least as broad as specified for the underlying coverages. Any such coverage provided under an excess or umbrella liability policy must include a “drop down provision” providing primary coverage above a maximum $25,000 self-insured retention for liability not covered by primary but covered by the umbrella. Coverage must be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There must be no cross- liability exclusion precluding coverage for claims or suits by one insured against another.

Coverage must be applicable to City for injury to employees of Contractor, its subcontractors or others performing work to satisfy Contractor’s obligations under this Contract. The scope of coverage provided is subject to approval of City following receipt of proof of insurance as required herein.

9.Certificates of Insurance and Endorsements. Prior to commencing any Work under this Contract, Contractor must file with the Director Certificates of Insurance and Endorsements evidencing the existence of all insurance required by this Contract, along with such other evidence of insurance or copies of policies as may reasonably be required by City. Such Certificates of Insurance and Endorsements must be in a form approved by the City Attorney of City. Contractor must maintain current certificates and endorsements on file with City during the term of this Contract reflecting the existence of all required insurance. Each of the certificates must expressly provide that no material change in the policy, or termination thereof, will be effective except upon 30 days prior written notice to City. The City reserves the right to require complete, certified copies of the insurance certificates and endorsements.

10.Accessibility of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the City.

11.Waiver of Subrogation. Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

Page 162 of 170 ends

16.D.

Page 254 of 593 ends

Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the Entity for all work performed by the Contractor, its employees, agents and subcontractors.

12. Failure to Maintain Required Insurance. If Contractor, for any reason, fails to have in place at all times during the term of this Contract all of the required insurance coverage, the Director may obtain such coverage at Contractor’s expense and deduct the cost from the sums due Contractor.

13. Subcontractors. Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that Entity is an additional insured on insurance required from subcontractors. For CGL coverage subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.

14. Effect of Coverage. The existence of the required insurance coverage under this Contract will not be deemed to satisfy or limit Contractor’s indemnity obligations under this Contract. Contractor acknowledges that the insurance coverage and policy limits set forth in this Contract constitute the minimum coverage and policy limits required. Any insurance proceeds available to City in excess of the limits and coverage required by this Contract, and which is applicable to a given loss, must be made available to City to compensate it for such losses.

15. Special Risks or Circumstances. Entity reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.

Page 163 of 170 ends

16.D.

Page 255 of 593 ends

PAYMENT BOND
(Bond for Labor and Material)
KNOW ALL PERSONS BY THESE PRESENTS:

1.01THAT WHEREAS, CITY OF HEMET (Owner) has awarded to Giles Engineering as Principal, dated the 13th day of November, 2025 (the Contract), titled the City of Hemet 2024/25 Raw Water - Treated Water Pipeline for Treatment Plant - CIP 2415 in the amount of $929,090.89, which Contract is by this reference made a part hereof, for the work of the following Contract:
2024/25 Raw Water - Treated Water Pipeline for Treatment Plant - CIP 2415

1.02AND WHEREAS, Principal is required to furnish a bond in connection with the Contract to secure the payment of claims of laborers, mechanics, material suppliers, and other persons as provided by law;

1.03NOW, THEREFORE, we, the undersigned Principal and
, as Surety, are held and firmly bound unto Owner in the sum of 100% OF THE CONTRACT PRICE ($929,090.89), for which payment well and truly to be made we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

1.04THE CONDITION OF THIS OBLIGATION IS SUCH, that if Principal, or its executors, administrators, successors, or assigns approved by Owner, or its subcontractors shall fail to pay any of the persons named in California Civil Code Section 9100, or amounts due under the State of California Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the State of California Employment Development Department from the wages of employees of Principal and subcontractors pursuant to Section 13020 of the State of California Unemployment Insurance Code with respect to such work and labor, that Surety will pay for the same in an amount not exceeding the sum specified in this bond, plus reasonable attorneys’ fees, otherwise the above obligation shall become and be null and void.

1.05This bond shall inure to the benefit of any of the persons named in California Civil Code Section 9100, as to give a right of action to such persons or their assigns in any suit brought upon this bond. The intent of this bond is to comply with the California Mechanic’s Lien Law.

1.06Surety, for value received, hereby expressly agrees that no extension of time, change, modification, alteration, or addition to the undertakings, covenants, terms, conditions, and agreements of the Contract, or to the work to be performed thereunder, shall in any way affect the obligation of this bond; and it does hereby waive notice of any such extension of time, change, modification, alteration, or addition to the undertakings, covenants, terms, conditions, and agreements of the Contract, or to the work to be performed thereunder.

Page 164 of 170 ends

16.D.

Page 256 of 593 ends

1.07Surety’s obligations hereunder are independent of the obligations of any other surety for the payment of claims of laborers, mechanics, material suppliers, and other persons in connection with Contract; and suit may be brought against Surety and such other sureties, jointly and severally, or against any one or more of them, or against less than all of them without impairing Owner’s rights against the other.

1.08Correspondence or claims relating to this bond shall be sent to Surety at the address set forth below.

IN WITNESS WHEREOF, we have hereunto set our hands this day of , 20___.

CONTRACTOR AS PRINCIPAL SURETY
Company: (Corp. Seal) Company: (Corp. Seal)
Signature Signature
Name Name
Title Title
Street Address Street Address
City, State, Zip Code City, State, Zip Code

END OF DOCUMENT

Page 165 of 170 ends

16.D.

Page 257 of 593 ends

CONSTRUCTION PERFORMANCE BOND
THIS CONSTRUCTION PERFORMANCE BOND (Bond) is dated November 13th, 2025 is in the amount of $929,090.89 (Penal Sum), which is 100% of the Contract Sum and is entered into by and between the parties listed below to ensure the faithful performance of the Contract identified below. This Bond consists of this page and the Bond Terms and Conditions, Paragraphs 1 through 14 attached to this page. Any singular reference to Giles Engineering (Contractor), (Surety), CITY OF HEMET (Owner), or other party shall
be considered plural where applicable.

CONTRACTOR: SURETY:

Giles Engineering
Address Principal Place of Business
City/State/Zip City/State/Zip
CONSTRUCTION CONTRACT: 2024/25 Raw Water - Treated Water Pipeline for Treatment Plant - CIP 2415, dated November 13th, 2025, in the amount of $929,090.89.

CONTRACTOR AS PRINCIPAL SURETY
Company: (Corp. Seal) Company: (Corp. Seal)
Signature: Signature:

Name: Name:

Title: Title:

Page 166 of 170 ends

16.D.

Page 258 of 593 ends

BOND TERMS AND CONDITIONS

1.Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to Owner for the complete and proper performance of the Construction Contract, which is incorporated herein by reference.

2.If Contractor completely and properly performs all of its obligations under the Construction Contract, Surety and Contractor shall have no obligation under this Bond.

3.If there is no Owner Default, Surety’s obligation under this Bond shall arise after:

3.1Owner provides Surety with written notice that Owner has declared a Contractor Default under the Construction Contract pursuant to the terms of the Construction Contract; and

3.2Owner has agreed to pay the Balance of Contract Sum:

3.2.1 To Surety in accordance with the terms of this Bond and the Construction Contract; or

3.2.2 To a Contractor selected to perform the Construction Contract in accordance with the terms of this Bond and the Construction Contract.

4.When Owner has satisfied the conditions of Paragraph 3 above, Surety shall promptly (within 40 Days) and at Surety’s expense elect to take one of the following actions:

4.1Arrange for Contractor, with consent of Owner, to perform and complete the Construction Contract (but Owner may withhold consent, in which case the Surety must elect an option described in Paragraphs 4.2, 4.3 or 4.4 below); or

4.2Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors or Construction entities; provided, that Surety may not select Contractor as its agent or independent contractor or Contractor without Owner’s consent; or

4.3Undertake to perform and complete the Construction Contract by obtaining bids from qualified contractors or Construction entities acceptable to Owner for a contract for performance and completion of the Construction Contract and, upon determination by Owner of the lowest responsive and responsible Bidder, arrange for a contract to be prepared for execution by Owner and the contractor or Contractor selected with Owner’s concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract; and, if Surety’s obligations defined in Paragraph 6 below, exceed the Balance of Contract Sum, then Surety shall pay to Owner the amount of such excess; or

Page 167 of 170 ends

16.D.

Page 259 of 593 ends

4.4Waive its right to perform and complete, arrange for completion, or obtain a new contractor or Contractor, and with reasonable promptness under the circumstances and, after investigation and consultation with Owner, determine in good faith its monetary obligation to Owner under Paragraph 6 below, for the performance and completion of the Construction Contract and, as soon as practicable after the amount is determined, tender payment therefor to Owner with full explanation of the payment’s calculation. If Owner accepts Surety’s tender under this Paragraph

4.4 above, Owner may still hold Surety liable for future damages then unknown or unliquidated resulting from the Contractor Default, as agreed by Owner and Surety at the time of tender. If Owner disputes the amount of Surety’s tender under this Paragraph 4.4 above, Owner may exercise all remedies available to it at law to enforce Surety’s liability under Paragraphs 6 and 6.3 below.

5.At all times Owner shall be entitled to enforce any remedy available to Owner at law or under the Construction Contract including, without limitation, and by way of example only, rights to perform work, protect Work, mitigate damages, advance critical Work to mitigate schedule delay, and coordinate Work with other consultants or contractors.

6.If Surety elects to act under Paragraphs 4.1, 4.2 or 4.3 above, within the time period provided in Paragraph 4, above, and complies with its obligations under this Bond, Surety’s obligations under this Bond are commensurate with Contractor’s Construction Contract obligations. Surety’s obligations include, but are not limited to:

6.1Contractor’s obligations to complete the Construction Contract and correct Defective Work;

6.2Contractor’s obligations to pay liquidated damages; and

6.3To the extent otherwise required of Contractor under the Construction Contract, Contractor’s obligations to pay additional legal, design professional, and other costs not included within liquidated damages resulting from Contractor Default (but excluding attorney’s fees incurred to enforce this Bond).

7.If Surety does not elect to act under Paragraphs 4.1, 4.2, 4.3, or 4.4, above, within the time period provided in Paragraph 4, above, or comply with its obligations under this Bond, then Surety shall be deemed to be in default on this Bond ten Days after receipt of an additional written notice from Owner to Surety demanding that Surety perform its obligations under this Bond. Such Surety default shall be independent of the Contractor Default. To the extent Surety’s independent default causes Owner to suffer damages including, but not limited to, delay damages, which are different from, or in addition to (but not duplicative of) damages which Owner is entitled to receive under the Construction Contract, Surety shall also be liable for such damages. In the event any Surety obligation following its independent default is inconsistent or conflicts with California Civil Code Section 2809, or any other law which either prohibits, restricts, limits or modifies in any way any obligation of a surety which is larger in amount or in any other respect more burdensome than that of the principal, Surety hereby waives the provisions of such laws to that extent.

Page 168 of 170 ends

16.D.

Page 260 of 593 ends

8.If Surety elects to act under Paragraphs 4.1, 4.3 or 4.4 above, within the time period provided in Paragraph 4, above, and complies with all obligations under this Bond, Surety’s monetary obligation under this Bond is limited to the Penal Sum.

9.No right of action shall accrue on this Bond to any person or entity other than Owner or its successors or assigns.

10.Surety hereby waives notice of any change, alteration or addition to the Construction Contract or to related subcontracts, design agreements, purchase orders and other obligations, including changes of time, and of any Owner action in accordance with Paragraph 5 above. Surety consents to all terms of the Construction Contract, including provisions on changes to the Contract. No extension of time, change, alteration, Modification, deletion, or addition to the Contract Documents, or of the Work (including services) required thereunder, or any Owner action in accordance with Paragraph 5 above shall release or exonerate Surety on this Bond or in any way affect the obligations of Surety on this Bond, unless such action is an Owner Default.

11.Any proceeding, legal or equitable, under this Bond shall be instituted in any court of competent jurisdiction where a proceeding is pending between Owner and Contractor regarding the Construction Contract, or in the Superior Court of the County of Riverside, California, or in a court of competent jurisdiction in the location in which the Work is located. Communications from Owner to Surety under Paragraph 3.1 above shall be deemed to include the necessary agreements under Paragraph 3.2 above unless expressly stated otherwise.

12.All notices to Surety or Contractor shall be mailed or delivered (at the address set forth on the signature page of this Bond), and all notices to Owner shall be mailed or delivered as provided in Section 1-7.1.10 of the Special Provisions. Actual receipt of notice by Surety, Owner or Contractor, however accomplished, shall be sufficient compliance as of the date received at the foregoing addresses.

13.Any provision in this Bond conflicting with any statutory or regulatory requirement shall be deemed deleted here from and provisions conforming to such statutory requirement shall be deemed incorporated herein.

14. Definitions

14.1 Balance of Contract Sum: The total amount payable by Owner to Contractor pursuant to the terms of the Construction Contract after all proper adjustments have been made under the Construction Contract, for example, deductions for progress payments made, and increases/decreases for approved Modifications to the Construction Contract.

14.2 Construction Contract: The agreement between Owner and Contractor identified on the signature page of this Bond, including all Contract Documents and changes thereto.

Page 169 of 170 ends

16.D.

Page 261 of 593 ends

14.3 Contractor Default: Material failure of Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract, limited to “default” or any other condition allowing a termination for cause as provided in Section 6-7.3 of the Special Provisions).

14.4 Owner Default: Material failure of Owner, which has neither been remedied nor waived, to pay Contractor progress payments due under the Construction Contract or to perform other material terms of the Construction Contract, if such failure is the cause of the asserted Contractor Default and is sufficient to justify Contractor termination of the Construction Contract.

END OF DOCUMENT

Page 170 of 170 ends

16.D.

Page 262 of 593 ends

City of Hemet
City Council Meeting

STAFF REPORT

Meeting: City Council Meeting - Nov 12 2025
Department: Public Works
Submitted by: Mark Prestwich, City Manager
Noah Rau, Public Works Director/City Engineer;

☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing

TITLE:

A Resolution of the City Council of the City of Hemet, California, Approving a Three-Year Software Solution Master Agreement with OpenGov, Inc. for a Total Contract Amount of $493,705 and Authorize the City Manager to Execute the Agreement, Annual Purchase Orders, and all Other Supporting Documents Related to the Agreement

RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Approving a Three-Year Software Solution Master Agreement with OpenGov, Inc. for a Total Contract Amount of $493,705 and Authorize the City Manager to Execute the Agreement, Annual Purchase Orders, and all Other Supporting Documents Related to the Agreement.

BACKGROUND:

The Public Works Department is responsible for the maintenance and repair of over 50 municipal buildings, more than 380 vehicles and pieces of equipment, water utility infrastructure, sewer infrastructure, and thousands of assets in the public right-of-way. The Department also oversees the capital improvement program (CIP) for all City infrastructure assets.

The City Council first awarded Cartegraph for use by the Public Works Department in September 2005 and has since been the City's long-time provider of asset management and workflow software used to record, delegate, and track the cost and type of maintenance work performed on all of these City assets. OpenGov Inc. acquired Cartegraph in July 2022 and has integrated Cartegraph into its OpenGov Cloud platform. The current three-year licensing agreement with OpenGov Inc. is approaching its expiration date on November 29, 2025, and staff is recommending the City Council waive procurement procedures and approve the renewal of OpenGov Inc. licensing under a new three-year master agreement.

Over the years as technology has advanced, there have been many improvements and increased functionality to the OpenGov (formerly Cartegraph) software and it has transformed the Public Works

Page 1 of 25 ends

16.E.

Page 263 of 593 ends

Department from a desktop platform, where work completed in the field was entered at computers in the office, to a web and GIS based platform where work performed in the field is tied to mapped assets, functionality These field. from time real in the be to data task allows and entered improvements of the system as a real-time tool have greatly improved the efficiency of task assignment and tracking. They have also added value not only to the field staff but also to their supervisors, who are able to assign tasks immediately from the field as they observe issues that need to be addressed.

ANALYSIS:

OpenGov software is used to track and manage the numerous assets tasked to the Public Works Department, including but not limited to pavement, curb & gutter, sidewalks, vehicles, equipment, fuel, facilities, trees, streetlights, traffic signals, and parks.

In recent years, OpenGov has provided the Public Works Department with a number of customizations to the database, including:

 Developing and implementing an easy import of storm water commercial and industrial inspection data from consultants related to the City’s storm water program.  Developing and implementing the use of a barcode system for easy identification of the heating and air conditioning assets and their specific replacement parts.  Customizing streetlight mapping and facility detail.
 Developed grids for the City's tree trimming and sidewalk inspection schedules.  Implemented the Pavement Management Program into OpenGov with Scenario Builder.

Planned customizations for the upcoming contract term include the following:

 Developing GIS-based water and sewer assets for management within OpenGov.  Developing a GIS-based pavement asset database to be managed within OpenGov.  Developing additional automated maintenance schedules.

DISCUSSION:

The proposed renewal Master Agreement (Attachment 2) includes not only software licensing renewal, but also incorporates staff training hours dedicated to education on features that are not currently utilized to their fullest extent, a three-day onsite visit biannually by an OpenGov team representative to assess the changing needs of field staff, and 36 remote hours per year to support reporting development, database customization or any additional training needs.

These services are bundled into OpenGov's “Orange Advantage” service package, and is offering the services at a discount as compared to purchasing the services individually. Taking advantage of this package allows the City staff to schedule training, eliminates any gaps in access to assistance for customization, saves administrative time preparing separate agreements and purchase orders for separate services, and locks in the reduced pricing for the Agreement term. Public Works has determined that the package will be reduced this contract period from the large down to the small that will provide some cost savings.

Page 2 of 25 ends

16.E.

Page 264 of 593 ends

Approval of this renewal Master Agreement would provide the Public Works Department with additional opportunity to streamline workflow, expedite processes, and continue working cost- effectively and efficiently in our asset management function.

PREVIOUS COUNCIL ACTION:

 On November 8, 2022, the City Council approved the most recent three-year renewal agreement with OpenGov Inc. (formerly Cartegraph Systems Inc.).

STRATEGIC PLAN INTEGRATION:

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

Objective 2: Evaluate existing practices to ensure continuity with industry best practices.

Objective 3: Provide Council with policies that are consistent while lessening liabilities.

Objective 4: Increase employee retention by training and creating a positive workplace.

Objective 5: Streamline fire prevention coordination efforts.

FISCAL IMPACT:

OpenGov software was budgeted for in the Public Works current fiscal year operating budget in the amount of $179,000 for the current fiscal year which included the large package for the remote response hours and Public Works has decided that the small package is adequate going forward realizing some savings. The upcoming fiscal years will be budgeted for accordingly.

The breakdown of the software solution cost by fiscal year is shown below:

Fiscal Year 2025/2026 $159,728.40
Fiscal Year 2026/2027 $164,520.25
Fiscal Year 2027/2028 $169,455.86
Total $493,704.51

ALTERNATIVE(S):

1. Do not approve the OpenGov asset management software renewal agreement.

2. Provide alternative direction to the City Manager.

REVIEWED BY LEGAL:

☐ Staff report ☐ Resolution
☐ Ordinance ☐ Agreement

ATTACHMENT(S):

Attachment 1 - OpenGov 2025 Renewal Resolution
Attachment 2 - OpenGov MA 2025-2028

Page 3 of 25 ends

16.E.

Page 265 of 593 ends
Page 4 of 25 ends

16.E.

Page 266 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 1
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

CITY OF HEMET

HEMET, CALIFORNIA
RESOLUTION NO. 2025-xxx

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF HEMET, CALIFORNIA, APPROVING A THREE-YEAR

SOFTWARE SOLUTION MASTER AGREEMENT WITH
OPENGOV, INC. FOR A TOTAL CONTRACT AMOUNT OF
$493,705 AND AUTHORIZING THE CITY MANAGER TO

EXECUTE THE AGREEMENT, ANNUAL PURCHASE

ORDERS, AND ALL OTHER SUPPORTING DOCUMENTS

RELATED TO THE AGREEMENT
The City Council of the City of Hemet, California (hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, the City of Hemet Public Works Department is responsible for the maintenance and repair of all municipal facilities, equipment, and City-owned assets in the public right of way; and
WHEREAS, the Public Works Department currently utilizes OpenGov, Inc. software as its asset management tool in tracking maintenance work performed on those assets; and
WHEREAS, the current licensing agreement with OpenGov Inc. expires November 29, 2025; and
WHEREAS, staff recommends approval of a new three (3) year Software Solution Master Agreement with OpenGov, Inc. in a total contract amount of $493,705

Page 5 of 25 ends

16.E.

Page 267 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 2
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
to provide software licensing, remote and onsite training, and data base support over the three-year agreement period; and
WHEREAS, Public Works has determined that it no longer needs the large “Orange Advantage” support package and is recommending reducing the package to the small that realizes some cost savings; and
WHEREAS, staff requests that City Council authorize the City Manager to execute all documents and purchase orders in support of this agreement.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HEMET FINDS, DETERMINES, ORDERS AND RESOLVES AS FOLLOWS:

SECTION 1. RECITALS - The above recitals are all true and correct.

SECTION 2. APPROVAL - Approves the three-year software solution master agreement with OpenGov Inc.

SECTION 3. AUTHORIZATION - Authorizes the City Manager to execute all documents related to this agreement.

SECTION 4. EFFECTIVE DATE - This Resolution shall become effective upon its adoption.

Page 6 of 25 ends

16.E.

Page 268 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 3
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
PASSED, APPROVED AND ADOPTED this 12th day of November, 2025. ____________________________
Jackie Peterson, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk

Page 7 of 25 ends

16.E.

Page 269 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 4
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 12th day of November 2025, and was passed by the following vote:

AYES: Council Members:

NOES: Council Members:

ABSTAIN: Council Members:

ABSENT: Council Members:
_____________________________
John Paul Maier, City Clerk

Page 8 of 25 ends

16.E.

Page 270 of 593 ends

OpenGov Inc. 660 3rd Street, Suite 100 San Francisco, CA 94107 United States Order Form Number: Q-03586 Prepared By: Allen Rosenbaum Created On: 10/10/2025 Email: [email protected] Order Form Expiration: 11/28/2025 Contract Term: 36 Months Subscription Start Date: 11/29/2025 Subscription End Date: 11/28/2028 Customer Information: Customer: City of Hemet, CA Contact Name: Noah Rau Bill To/Ship To: 445 E. Florida Ave Email: [email protected] Hemet, California Phone: 9517652360 92543 United States Order Details: Billing Frequency: Prepaid Payment Terms: Net 30 Days SOFTWARE SERVICES: Product Name Start Date End Date Annual Fee Facilities Domain 11/29/2025 11/28/2026 $0.00 OA Onsite - 3 days biannually 11/29/2025 11/28/2026 $15,244.00 OMS Plus 11/29/2025 11/28/2026 $79,768.35 OMS User 11/29/2025 11/28/2026 $26,223.80 Orange Advantage - Small 11/29/2025 11/28/2026 $7,000.00 Sanitary Sewer Domain 11/29/2025 11/28/2026 $0.00 Scenario Builder (option) 11/29/2025 11/28/2026 $3,440.20

Page 9 of 25 ends

16.E.

Page 271 of 593 ends

SCF City 80,000 - 99,999 (includes 80 SCF users) 11/29/2025 11/28/2026 $28,052.05 Signal Domain 11/29/2025 11/28/2026 $0.00 Stormwater Domain 11/29/2025 11/28/2026 $0.00 Transportation Domain 11/29/2025 11/28/2026 $0.00 Walkability Domain 11/29/2025 11/28/2026 $0.00 Water Distribution Domain 11/29/2025 11/28/2026 $0.00 Facilities Domain 11/29/2026 11/28/2027 $0.00 OA Onsite - 3 days biannually 11/29/2026 11/28/2027 $15,701.32 OMS Plus 11/29/2026 11/28/2027 $82,161.40 OMS User 11/29/2026 11/28/2027 $27,010.51 Orange Advantage - Small 11/29/2026 11/28/2027 $7,210.00 Sanitary Sewer Domain 11/29/2026 11/28/2027 $0.00 Scenario Builder (option) 11/29/2026 11/28/2027 $3,543.41 SCF City 80,000 - 99,999 (includes 80 SCF users) 11/29/2026 11/28/2027 $28,893.61 Signal Domain 11/29/2026 11/28/2027 $0.00 Stormwater Domain 11/29/2026 11/28/2027 $0.00 Transportation Domain 11/29/2026 11/28/2027 $0.00 Walkability Domain 11/29/2026 11/28/2027 $0.00 Water Distribution Domain 11/29/2026 11/28/2027 $0.00

Page 10 of 25 ends

16.E.

Page 272 of 593 ends

Facilities Domain 11/29/2027 11/28/2028 $0.00 OA Onsite - 3 days biannually 11/29/2027 11/28/2028 $16,172.36 OMS Plus 11/29/2027 11/28/2028 $84,626.24 OMS User 11/29/2027 11/28/2028 $27,820.83 Orange Advantage - Small 11/29/2027 11/28/2028 $7,426.30 Sanitary Sewer Domain 11/29/2027 11/28/2028 $0.00 Scenario Builder (option) 11/29/2027 11/28/2028 $3,649.71 SCF City 80,000 - 99,999 (includes 80 SCF users) 11/29/2027 11/28/2028 $29,760.42 Signal Domain 11/29/2027 11/28/2028 $0.00 Stormwater Domain 11/29/2027 11/28/2028 $0.00 Transportation Domain 11/29/2027 11/28/2028 $0.00 Walkability Domain 11/29/2027 11/28/2028 $0.00 Water Distribution Domain 11/29/2027 11/28/2028 $0.00 Customer Billing/Service Periods: Period: Total: 11/29/2025 $159,728.40 11/29/2026 $164,520.25 11/29/2027 $169,455.86 Order Form Legal Terms: This Order Form incorporates the OpenGov Master Services Agreement ("MSA") attached here or available at https://opengov.com/terms-of-service/master-services-agreement/. The "Agreement" between OpenGov and the entity identified above ("Customer") consists of the Order Form, MSA, and, if Professional Services are purchased, the Statement of Work.

Page 11 of 25 ends

16.E.

Page 273 of 593 ends

Unless otherwise specified above, fees for the Software Services and Professional Services shall be due and payable, in advance, 30 days from receipt of the invoice. By signing this Agreement, Customer acknowledges that it has reviewed, and agrees to be legally bound by the Agreement. Each party’s acceptance of this Agreement is conditional upon the other’s acceptance of the Agreement to the exclusion of all other terms City of Hemet, CA: OpenGov, Inc. Signature: ____________________________ Signature: ____________________________ Name: ____________________________ Name: ____________________________ Title: ____________________________ Title: ____________________________ Date: ____________________________ Date: ____________________________

Page 12 of 25 ends

16.E.

Page 274 of 593 ends

OpenGov Master Services
Agreement
Last Modied: 5/5/2025
View agreement archive →
The parties to this Master Services Agreement this “Agreement” are OpenGov, Inc., a Delaware corporation “OpenGov”, and the party procuring OpenGov’s products and services “Customer”. Each Customer will execute an Order Form, which becomes binding when the parties sign it the “Effective Date” and sets forth the terms and conditions under which OpenGov will provide its products and services to Customer.

1. Denitions

1.1. “Customer Data” means the data that is provided by Customer to OpenGov pursuant to this Agreement for example, by email or through Customer’s software systems of record, including any data transmitted through the Software Services.

1.2. “Documentation” means any written, electronic, or online materials produced by OpenGov, and made available to Customer in connection with the Software Services, including user guides, training materials, FAQs, and technical support content, but excluding Product Documentation.

1.3. “Intellectual Property Rights” means all past, present, and future intellectual property rights including those associated with works of authorship, copyrights, moral rights, trademarks, trade names, trade LOGIN REQUEST A DEMO 

Page 13 of 25 ends

16.E.

Page 275 of 593 ends

secrets, patent rights, and any other proprietary rights in intellectual property of every kind and nature.

1.4. “Order Form” means the documents separately executed by the parties or attached as an exhibit, that species the Software Services and the Professional Services that OpenGov will provide to Customer. All such Order Forms are incorporated into this Agreement by reference.

1.5. “Product Documentation” means the technical specications that describe the features, functionality, conguration, and intended operation of the Software Services located at
https://opengov.my.site.com/support/s/agreement-product- documentation, which is incorporated into this Agreement by reference.

1.6. “Professional Services” means the implementation, conguration, training, consulting, or other professional services provided by OpenGov or its authorized partners, and identied in the applicable Statement of Work.

1.7. “Software Services” means the commercial-off-the-shelf software products and services provided by OpenGov and identied in the applicable Order Form.

1.8. “Statement of Work” or “SOW” means the documents separately executed by the parties or attached as an exhibit to this Agreement or any applicable Order Form, that species the Professional Services that OpenGov will provide to Customer. All such SOWs are incorporated into this Agreement by reference.

2. Software Services and Professional Services

2.1. Software Services.

2.1.1. Subject to the terms and conditions of this Agreement, OpenGov will use commercially reasonable efforts to provide the Software Services.

2.1.2. Support and Service Levels. Customer support is available by email to [email protected] or by using the chat messaging LOGIN REQUEST A DEMO 

Page 14 of 25 ends

16.E.

Page 276 of 593 ends

functionality of the Software Services. Customer may report issues any time; however, OpenGov will address issues during business hours. OpenGov will provide the applicable level of support in accordance with the Support and Software Service Levels located at https://opengov.com/service-sla, which is incorporated into this Agreement by reference.

2.2. Professional Services.

2.2.1. Subject to the terms and conditions of this Agreement, OpenGov will use commercially reasonable efforts to provide the Professional Services, if applicable. Unless otherwise specied in the SOW, any pre-paid Professional Services must be utilized within one year from the Effective Date.

2.2.2. Travel Expenses for Professional Services. Travel expenses, if any, will be set forth in the applicable Order Form or SOW. Any additional travel expenses shall be subject to Customer’s prior written approval and will be reimbursable by Customer.

3. Restrictions and Responsibilities

3.1. Restrictions. Customer may not use the Software Services in any manner or for any purpose other than as expressly permitted by the Agreement. In addition, Customer shall not, and shall not knowingly or negligently, permit or enable any third party to: a use or access any of the Software Services to build a competitive product or service; b modify, disassemble, decompile, reverse engineer or otherwise make any derivative use of the Software Services except to the extent applicable laws specically prohibit such restriction; c sell, license, rent, lease, assign, distribute, display, host, disclose, outsource, copy or otherwise commercially exploit the Software Services; d perform or disclose any benchmarking or performance testing of the Software Services, including but not limited to load testing or stress testing; e remove any proprietary notices included with the Software Services; f use the Software Services in violation of applicable law; or g transfer any personal, sensitive, or personally identiable information to OpenGov in a manner that violates Customer’s obligations under the Data Processing Addendum.

LOGIN REQUEST A DEMO 

Page 15 of 25 ends

16.E.

Page 277 of 593 ends

3.2. Responsibilities. Customer shall be responsible for obtaining and maintaining computers, third-party software systems of record, and application programming interfaces needed to connect to, access, or otherwise use the Software Services. Customer shall also be responsible for: a ensuring that such equipment is compatible with the Software Services, b maintaining the security of such equipment, user accounts, passwords and les, in accordance with industry standards, and c all uses of Customer user accounts by any party other than OpenGov.

OpenGov is not responsible for the operation, support, or security of any third-party software, systems, or services not provided by OpenGov.

3.3. Data Processing Addendum. To the extent OpenGov processes any Customer Data that contains personal information, personally identiable information, or sensitive personal information on behalf of Customer in the course of providing the Software Services and Professional Services under this Agreement, the parties agree to comply with the terms of the Data Processing Addendum, located at https://opengov.com/terms-of- service/data-processing-addendum/, which is incorporated into this Agreement by reference.

4. Intellectual Property Rights; License Grants; Access to Customer Data

4.1. OpenGov’s Intellectual Property Rights. OpenGov exclusively owns and retains all right, title, and interest to the Software Services, Professional Services, Documentation, and Product Documentation, including all Intellectual Property Rights therein. This includes, without limitation, all underlying technology, software, user interfaces, visual design elements such as the “look and feel”, custom fonts, graphics, workows, button icons, and any derivative works e.g., enhancements, modications, or corrections, including but not limited to those that are created in connection with or through the use of the Software Services, Professional Services, Documentation, or Product Documentation.

Customer may not reproduce, modify, distribute, or create derivative works based on any part of the Software Services, in whole or in part, without OpenGov’s prior written consent.

LOGIN REQUEST A DEMO 

Page 16 of 25 ends

16.E.

Page 278 of 593 ends

4.2. License Grant to Customer. OpenGov grants Customer a non- exclusive, nontransferable, non-sublicensable, royalty-free license to use the Software Services, Documentation, and Product Documentation during the Term for its internal use and the purpose as described in this Agreement. No additional rights or licenses shall be deemed granted.

4.3. Customer’s Intellectual Property Rights. Customer retains all right, title, and interest, including all Intellectual Property Rights, in and to Customer Data. Customer grants OpenGov and its authorized partners such as cloud hosting providers a non-exclusive, royalty-free license to access, use, store, edit, reformat and otherwise process Customer Data for the purpose of providing, maintaining, developing, and improving OpenGov’s products and services.

4.4. Aggregated and Anonymized Data. Customer agrees that OpenGov and its authorized partners may use aggregated and anonymized data derived from Customer Data to provide, maintain, develop, and improve OpenGov’s products and services, to provide general customer service support and improvements, and to perform data and usage analytics. Any insights, developments, or improvements arising from such aggregated, anonymized data shall be owned by OpenGov.

4.5. Access to Customer Data. Customer may download Customer Data from the Software Services at any time during the Term, excluding during routine software maintenance periods. For a period of 30 days after expiration of the Term, Customer may request that OpenGov complete a one-time transfer of Customer Data in a format customarily used in the industry at OpenGov’s then-current hourly rate.

4.6. Deletion of Customer Data. Unless otherwise requested pursuant to this Section 4.6, upon the termination of this Agreement, Customer Data shall be deleted pursuant to OpenGov’s standard data deletion and retention practices, which is to delete Customer Data 45 days after termination or expiration of the Agreement. Upon written request, Customer may request deletion of Customer Data prior to the date of termination of this Agreement, in accordance with the notice requirements set forth in Section 10.2.

LOGIN REQUEST A DEMO 

Page 17 of 25 ends

16.E.

Page 279 of 593 ends

4.7. Feedback. “Feedback” means any suggestions, comments, ideas, recommendations, usage, or other input provided by Customer to OpenGov regarding the services. Customer grants OpenGov a non- exclusive, royalty-free, irrevocable, perpetual, worldwide license to use such Feedback in the Software Services, Professional Services, Documentation and Product Documentation. OpenGov will exclusively own all right, title, and interest, including all Intellectual Property Rights, in and to any improvements, modications, or derivative works to the Software Services, Professional Services, Documentation or Product Documentation that are based on or derived from such Feedback.

5. Condentiality

5.1. “Condential Information” means all condential business, technical, and nancial information of the disclosing party that is marked as “Condential” or an equivalent designation or that should reasonably be understood to be condential given the nature of the information and/or the circumstances surrounding the disclosure. OpenGov’s Condential Information includes, without limitation, the software underlying the Software Services, Documentation, and Product Documentation.

5.2. Condential Information does not include information that: a was publicly known or becomes publicly known through no breach of this Agreement by the receiving party; b is required to be disclosed upon request under any applicable federal, state, or local public records laws; c Customer expressly directs OpenGov make publicly available; d was lawfully known to the receiving party without restriction on disclosure before receipt from the disclosing party; e is disclosed to the receiving party by a third party who has the right to make such disclosure without restriction; or f is independently developed by the receiving party without access to the disclosing party’s Condential Information.

5.3. Each party agrees to use the other’s Condential Information only in connection with this Agreement. Each party further agrees to protect the other party’s Condential Information using the measures that it employs with respect to its own Condential Information of a similar nature, but in no event with less than reasonable care. If a party is required to disclose LOGIN REQUEST A DEMO 

Page 18 of 25 ends

16.E.

Page 280 of 593 ends

Condential Information by law, subpoena, or court order, it must, to the extent legally permitted, promptly notify the other party in writing prior to the disclosure to give the other party an opportunity to oppose or limit the disclosure.

6. Term and Termination

6.1. Agreement Term. This Agreement begins on the Effective Date and will remain in effect until the termination or expiration of all active Order Forms entered into under this Agreement “Term”, unless earlier terminated pursuant to this Section 6.

6.2. Renewal. Each Order Form shall automatically renew for additional terms equal in duration to its initial term each, a “Renewal Term”, unless either party provides written notice of non-renewal at least 30 days prior to the expiration of the then-current term.

6.3. Termination for Cause. If either party materially breaches this Agreement and fails to cure such breach within 30 days after receiving written notice by the non-breaching party, the non-breaching party may terminate this Agreement.

6.4. Termination for Non-Appropriation. If required by applicable law, Customer may terminate this Agreement if it does not appropriate funds for a future scal year. In order to terminate for non-appropriation, Customer must provide at least 30 days’ prior written notice, provided it is after the rst full year of the Agreement. Obligations to pay fees are non-cancelable, and payments are non-refundable. This section may not be used as a substitute for termination for convenience.

6.5. Effect of Termination. Upon termination of this Agreement pursuant to Section 6: a Customer shall pay in full for all of the Software Services and Professional Services for the then-current annual term; b OpenGov shall stop providing the Software Services and the Professional Services to Customer; and c with the exception of Customer Data, the return and deletion of which are addressed in Section 4, each party shall, upon request of the other party, return or delete any of the other party’s Condential Information.

LOGIN REQUEST A DEMO 

Page 19 of 25 ends

16.E.

Page 281 of 593 ends

7. Payment of Fees

7.1. Fees; Invoicing; Payment; Expenses.

7.1.1. Fees. Fees for the Software Services and Professional Services are set forth in the applicable Order Form, and OpenGov will invoice Customer accordingly. Customer agrees to pay invoices within 30 days of receipt. Invoices are deemed received when OpenGov emails them to Customer’s designated billing contact. Obligations to pay fees are non-cancelable, and payments are non-refundable, except as expressly provided in Sections 8.1.2 and 8.1.3.

7.1.2. Annual Software Price Adjustment. OpenGov shall increase the fees for the Software Services during any Renewal Term by 5% each year or as otherwise agreed upon in the applicable renewal Order Form.

7.1.3. Travel Expenses. OpenGov will invoice Customer for travel expenses provided in the SOW or Order Form as they are incurred.

Customer shall pay all such valid invoices within 30 days of receipt of invoice. Receipts shall be provided for the travel expenses listed on the invoice.

7.2. Consequences of Non-Payment. If Customer fails to make any payments required under any Order Form or SOW, then in addition to any other rights OpenGov may have under this Agreement or applicable law:
a Customer will owe a late interest penalty of the maximum rate permitted by law; and b if Customer’s account remains delinquent with respect to payment of an undisputed invoice for 10 days after receipt of a delinquency notice from OpenGov, which may be provided via email to Customer’s designated billing contact, OpenGov may temporarily suspend Customer’s access to the Software Service for up to 90 days to pursue good faith negotiations before pursuing termination in accordance with Section 6.3. Customer will continue to incur and owe all applicable fees irrespective of any such service suspension based on such Customer’s delinquency.

LOGIN REQUEST A DEMO 

Page 20 of 25 ends

16.E.

Page 282 of 593 ends

7.3. Taxes. Each party is responsible for the tax effects this Agreement imposes upon it. If Customer is tax-exempt, it will provide OpenGov its tax exemption certicate.

8. Representations and Warranties; Disclaimer

8.1. By OpenGov.

8.1.1. General Warranty. OpenGov represents and warrants that it has all right and authority necessary to enter into and perform this Agreement.

8.1.2. Professional Services Warranty. OpenGov further represents and warrants that the Professional Services, if any, will be performed in a professional and workmanlike manner in accordance with the related SOW and generally prevailing industry standards. For any breach of the Professional Services warranty, OpenGov will reperform the applicable services. If OpenGov is unable to re- perform such work as warranted, Customer will be entitled to recover all fees paid to OpenGov for the decient work. Customer must give written notice of any claim under this warranty to OpenGov within 90 days of the completion of the Professional Services pursuant to the applicable SOW to receive such warranty remedies.

8.1.3. Software Services Warranty. OpenGov further represents and warrants that for the Term, the Software Services will perform in all material respects in accordance with the then-current Product Documentation. The foregoing warranty does not apply to a any Software Services that have been used in a manner other than as set forth in this Agreement, or b any pre-release features, functionality, or beta software services that Customer elects to use in the beta phase of development. For any breach of the Software Services warranty, OpenGov will repair or replace any nonconforming Software Services so that the affected portion of the Software Services operates as warranted. If OpenGov is unable to do so, Customer may terminate the Agreement and will be entitled to a refund of the pre-paid, unused portion of the fees from the date of LOGIN REQUEST A DEMO 

Page 21 of 25 ends

16.E.

Page 283 of 593 ends

the discovery of the defect. Customer must give written notice of any claim under this warranty to OpenGov within 90 days of Customer discovering the defect to receive such warranty remedies.

8.2. By Customer. Customer represents and warrants that a it has all right and authority necessary to enter into and perform this Agreement and b OpenGov’s use of Customer Data pursuant to this Agreement will not infringe, violate or misappropriate Intellectual Property Rights of any third party.

8.3. Disclaimer. OPENGOV DOES NOT WARRANT THAT THE SOFTWARE SERVICES WILL BE UNINTERRUPTED OR ERROR FREE; NOR DOES IT

MAKE ANY WARRANTY AS TO THE RESULTS THAT MAY BE OBTAINED FROM USE OF THE SOFTWARE SERVICES. EXCEPT AS SET FORTH IN THIS SECTION 8, THE SOFTWARE SERVICES ARE PROVIDED “AS IS”

AND OPENGOV DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR

IMPLIED, INCLUDING, BUT NOT LIMITED TO, IMPLIED WARRANTIES OF

MERCHANTABILITY, TITLE, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT.

9. Limitation of Liability

9.1. By Type. NEITHER PARTY, NOR ITS SUPPLIERS, OFFICERS,

AFFILIATES, REPRESENTATIVES, CONTRACTORS OR EMPLOYEES,

SHALL BE RESPONSIBLE OR LIABLE WITH RESPECT TO ANY SUBJECT

MATTER OF THIS AGREEMENT UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY, OR OTHER THEORY: A FOR ERROR OR

INTERRUPTION OF USE OR FOR LOSS OR INACCURACY OF DATA OR

COST OF PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES OR
LOSS OF BUSINESS; B FOR ANY INDIRECT, EXEMPLARY, PUNITIVE, INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES; OR C FOR ANY MATTER BEYOND A PARTY’S REASONABLE CONTROL, EVEN IF

SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH LOSS OR DAMAGE.

9.2. By Amount. IN NO EVENT SHALL EITHER PARTY’S AGGREGATE,

CUMULATIVE LIABILITY FOR ANY CLAIMS ARISING OUT OF OR IN ANY

WAY RELATED TO THIS AGREEMENT EXCEED THE FEES PAID OR
LOGIN REQUEST A DEMO 

Page 22 of 25 ends

16.E.

Page 284 of 593 ends

PAYABLE BY CUSTOMER TO OPENGOV FOR THE SOFTWARE SERVICES UNDER THIS AGREEMENT IN THE 12 MONTHS PRIOR TO THE ACT THAT GAVE RISE TO THE LIABILITY.

9.3. Limitation of Liability Exclusions. The limitations of liability set forth in Sections 9.1 and 9.2 above do not apply to, and each party accepts liability to the other for: a claims arising out of fraud or willful misconduct by either party; b either party’s infringement of the other party’s Intellectual Property Rights; c breach of obligations under Section 3.1; and d payment obligations under this Agreement.

9.4. No Limitation of Liability by Law. Because some jurisdictions do not allow liability or damages to be limited to the extent set forth above, some of the above limitations may not apply.

10. Miscellaneous

10.1. Logo Use. OpenGov shall have the right to use and display Customer’s logos and trade names for marketing and promotional purposes in OpenGov’s website and marketing materials, subject to Customer’s trademark usage guidelines provided to OpenGov.

10.2. Notice. Ordinary day-to-day operational communications may be conducted by email, live chat or telephone. For notices required by the Agreement the parties must communicate more formally in a writing sent via USPS certied mail and via email. OpenGov’s addresses for notice are:
[email protected] with a mailed copy to OpenGov, Inc., 660 3rd Street, Suite 100, San Francisco, CA 94107.

10.3. Anti-corruption. Neither OpenGov nor any of its employees or agents has offered or provided any illegal or improper payment, gift, or transfer of value in connection with this Agreement. The parties will promptly notify each other if they become aware of any violation of any applicable anti- corruption laws in connection with this Agreement.

10.4. Injunctive Relief. The parties acknowledge that any breach of the condentiality provisions or the unauthorized use of a party’s intellectual property may result in serious and irreparable injury to the aggrieved LOGIN REQUEST A DEMO 

Page 23 of 25 ends

16.E.

Page 285 of 593 ends

party for which damages may not adequately compensate the aggrieved party. The parties agree, therefore, that, in addition to any other remedy that the aggrieved party may have, it shall be entitled to seek equitable injunctive relief without being required to post a bond or other surety or to prove either actual damages or that damages would be an inadequate remedy.

10.5. Force Majeure. Neither party will be liable for any delay or failure to perform its obligations under this Agreement, due to any events beyond its reasonable control, including but not limited to acts of god, acts of governmental authority, war, riot, labor disputes, failures of performance by any third-party services, utilities, or equipment failures, or any other events beyond the party’s reasonable control. Notwithstanding the foregoing, Customer shall remain obligated to perform its obligations under Section 7.1.1.

10.6. Severability; Waiver. If any provision of this Agreement is found to be unenforceable or invalid, that provision will be limited or eliminated to the minimum extent necessary so that this Agreement will otherwise remain in full force and effect and enforceable. Any express waiver or failure to exercise promptly any right under this Agreement will not create a continuing waiver or any expectation of non-enforcement.

10.7. Survival. The following sections of this Agreement shall survive termination or expiration: Section 5 Condentiality, Section 7 Payment of Fees, Section 4.6 Deletion of Customer Data, Section 8.3 Warranty Disclaimer, Section 9 Limitation of Liability, and Section 10 Miscellaneous.

10.8. Assignment. There are no third-party beneciaries to this Agreement.

Neither party may assign, or otherwise transfer this Agreement without the other party’s written consent, which consent may not be unreasonably withheld, conditioned, or delayed. Notwithstanding the foregoing, either party may assign, without such consent but upon written notice, its rights and obligations under this Agreement to its corporate afliate or to any entity that acquires all or substantially all of its capital stock or its assets related to this Agreement, through purchase, LOGIN REQUEST A DEMO 

Page 24 of 25 ends

16.E.

Page 286 of 593 ends

merger, consolidation, or otherwise. Any other attempted assignment shall be void. This Agreement will benet and bind permitted assigns and successors.

10.9. Independent Contractors. This Agreement does not create an agency, partnership, joint venture, or employment relationship, and neither party has any authority to bind the other.

10.10. Governing Law and Jurisdiction. This Agreement will be governed by the laws of Customer’s jurisdiction, without regard to conict of laws principles. The parties submit to personal jurisdiction and venue in the courts of Customer’s jurisdiction.

10.11. Complete Agreement. OpenGov has made no other promises or representations to Customer other than those contained in this Agreement. Any additional or different terms in a purchase order or click- through agreement are expressly rejected by the parties and are void. Any modication to this Agreement must be in writing and signed by an authorized representative of each party. No third parties are authorized to modify this Agreement. If there is a conict between this Agreement and any other attached or incorporated document, the terms of this Agreement will control unless expressly stated otherwise.

About
Leadership
Newsroom
Careers
Support
Request a Demo
SLA
DPA
Security
Accessibility
Store
LOGIN REQUEST A DEMO 

Page 25 of 25 ends

16.E.

Page 287 of 593 ends
Page 288 of 593 ends

City of Hemet
City Council Meeting

STAFF REPORT

Meeting: City Council Meeting - Nov 12 2025
Department: Public Works
Submitted by: Mark Prestwich, City Manager
Travis Holyoak, Water/Waste Water Superintendent;

☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing

TITLE:

A Resolution of the City Council of the City of Hemet, California, Awarding the Purchase of one 2025 F550 Dump Truck to PFVT Motors in the amount of $92,011.29 and Authorizing the City Manager to Execute all Necessary Documents in Support of the Award and Declaring Vehicle #9020 as Surplus

RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Awarding the Purchase of one 2025 F550 Dump Truck to PFVT Motors in the amount of $92,011.29 and Authorizing the City Manager to Execute all Necessary Documents in Support of the Award and Declaring Vehicle #9020 as Surplus.

BACKGROUND:

The Water Division operates and maintains a comprehensive water system serving more than 9,700 residential and commercial connections that provides service to approximately 33,800 customers within the City of Hemet. The system includes over 132 miles of water pipelines throughout the city.

The Division is responsible for maintaining water transmission and distribution lines to ensure the reliable delivery of water to City of Hemet customers. To effectively perform these duties, the Division requires appropriate equipment and vehicles to ensure personnel are equipped with the necessary resources to perform maintenance and operational tasks efficiently and safely.

Currently, the Water Division utilizes a 1999 Ford F-350, which has reached the end of its useful service life. The City of Hemet Fleet Division has evaluated the vehicle and recommends its replacement to maintain operational efficiency and reliability within the Water Division.

ANALYSIS:

Page 1 of 166 ends

16.F.

Page 289 of 593 ends

City staff researched various vehicle configurations and determined that a Ford F550 with a dump- style body would be best suited for the Division's needs. This vehicle allows crews to have the capabilities of a dump truck while maintaining a smaller footprint and overall package. The vehicle will be utilized to haul material and tow trailers carrying equipment, such as a Caterpillar Skid Steer, to job sites.

On October 7, 2025, the City of Hemet solicited bids on the Planet Bids platform, where 67 vendors were notified. On October 22, 2025, a total of seven bids were received and reviewed by staff, resulting in PFVT Motors as the verified lowest responsive bidder. All required bidding procedures were followed for this vehicle procurement.

Vendor Price Quote
PFVT Motors $92,011.29
Santa Margarita Ford $95,543.90
Western Truck Exchange $100,594.00
FBH Motors $101,189.00
Tim Moran Ford $107,134.23
Warren Anderson Ford $108,079.93
Winner Chevrolet $111,560.81

DISCUSSION:

City staff recommends awarding the contract to PFVT Motors for the purchase of one new Ford F-550 with a dump body in the amount of $92,011.29. The purchase of this vehicle will replace a 26-year- old truck that has served the City well, but its usefulness has come to an end. The new truck will be an upgrade from the replacement, not only in age but also in its capabilities.

PREVIOUS COUNCIL ACTION:

The City Council approved the funding for Ford F550 dump truck in the fiscal year 25/26 budget.

STRATEGIC PLAN INTEGRATION:

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

Objective 2: Evaluate existing practices to ensure continuity with industry best practices.

FISCAL IMPACT:

There is no General Fund Impact. Funding for this purchase is available in the adopted fiscal year 2025-26 Equipment Replacement fund 380-9000.

ALTERNATIVE(S):

Page 2 of 166 ends

16.F.

Page 290 of 593 ends

1. Do not approve the Award of Purchase.

2. Provide alternative direction to the City Manager.

ATTACHMENT(S):

Attachment 1 - Resolution Vehicle Purchase 2025 F550 Dump Truck Attachment 2 - Bid Summary
Attachment 3 - Bids Received

Page 3 of 166 ends

16.F.

Page 291 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 1
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

CITY OF HEMET

HEMET, CALIFORNIA
RESOLUTION NO. 2025-xxx

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF HEMET, CALIFORNIA, AWARDING THE PURCHASE
OF ONE 2025 F550 DUMP TRUCK TO PFVT MOTORS IN
THE AMOUNT OF $92,011.29 AND AUTHORIZING THE

CITY MANAGER TO EXECUTE ALL NECESSARY

DOCUMENTS IN SUPPORT OF THE AWARD AND
DECLARING VEHICLE #9020 AS SURPLUS
The City Council of the City of Hemet, California (hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, the Public Works Water Division operates and maintains a water system that serves over 9,700 residential and commercial water connections for a population of approximately 33,800 water customers and has 132 miles of pipeline within the City of Hemet and;
WHEREAS, the Division is responsible for maintaining water transmission and distribution lines to ensure water delivery to City of Hemet water customers. The Water Division requires proper equipment to be able to maintain the system and ensure personnel has the right assets to do the work; and
WHEREAS, currently the City of Hemet has a 1999 Ford F350 that the Water Division has been utilizing, and this vehicle is at the end of its useful life, with the City of Hemet’s Fleet Division recommending its replacement; and WHEREAS, City staff researched various vehicle configurations and determined that a Ford F550 with a dump-style body would be best suited for the Division’s needs.

Page 4 of 166 ends

16.F.

Page 292 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 2
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
This vehicle allows crews to have the capabilities of a dump truck while maintaining a smaller footprint and overall package; and
WHEREAS, on October 7, 2025, the City of Hemet solicited bids on the Planet Bids platform, where 67 vendors were notified. On October 22, 2025, a total of 7 bids were received and reviewed by staff, resulting in PFVT Motors as the verified lowest responsive bidder. All required bidding procedures were followed for this vehicle procurement; and
WHEREAS, City staff recommends awarding the purchase to PFVT Motors for one new Ford F550 with a dump body in the amount of $92,011.29; and

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HEMET FINDS, DETERMINES, ORDERS AND RESOLVES AS FOLLOWS:

SECTION 1.RECITALS - The recitals set forth above are hereby adopted as findings in support of this resolution.

SECTION 2.APPROVAL – Approves the award of vehicle purchase for one new 2025 Ford F550 Dump Truck to PFVT Motors in the amount of $92,011.29.

SECTION 3.AUTHORIZATION - Authorizes the City Manager to execute all necessary documents in support of the award.

SECTION 4.SURPLUS - Declares vehicle #9020, a 1999 Ford F350, as surplus.

SECTION 5.EFFECTIVE DATE - This resolution shall become effective upon adoption.

Page 5 of 166 ends

16.F.

Page 293 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 3
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
PASSED, APPROVED AND ADOPTED this 12th day of November, 2025. ____________________________
Jackie Peterson, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk

Page 6 of 166 ends

16.F.

Page 294 of 593 ends

CITY OF HEMET RESOLUTION NO. 2025-XXX 4
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 12th day of November, 2025, and was passed by the following vote:

AYES: Council Members:

NOES: Council Members:

ABSTAIN: Council Members:

ABSENT: Council Members:
_____________________________
John Paul Maier, City Clerk

Page 7 of 166 ends

16.F.

Page 295 of 593 ends

City of Hemet
Bid Results for Project New Ford F‐550 with Dump Bed
Issued on 10/07/2025
Bid Due on October 22, 2025  3:00 PM (PDT)
Exported on 10/23/2025
Line Totals (Unit Price * Quantity)
Item Description UOM QTY Unit  Price Line  Total Unit  Price Line  Total Unit  Price Line  Total Unit  Price Line  Total Unit  Price Line  Total Unit  Price Line  Total Unit  Price Line  Total 1 Ford  F‐550 with Dump Bed LS 1 $92,011.29 $92,011.29 $95,543.90 $95,543.90 $100,594.00 $100,594.00 $101,189.00 $101,189.00 $107,134.23 $107,134.23 $108,079.93 $108 ,079.93 $111,560.81 $111,560.81 Subtotal $92,011.29 $95,543.90 $100,594.00 $101,189.00 $107,134.23 $108,079.93 $111,560.81 Total $92,011.29 $95,543.90 $100,594.00 $101,189.00 $107,134.23 $108,079.93 $111,560.81 Winner Chevrolet, Inc. PFVT Motors LLC Santa  Margarita Ford Western  Truck Exchange FFBH Motors LLC dba Frontier For Tim  Moran Ford  warren anderson ford

Page 8 of 166 ends

16.F.

Page 296 of 593 ends

CITY OF HEMET

INVITATION FOR BID

NEW FORD F-550 WITH DUMP BED

Date of Issue:

October 7, 2025

Question Deadline:

September 15, 2025, by 3:00pm

Bid Due Date:

October 22, 2025, by 3:00pm

Bid Delivery Method & Location:

Electronically on PlanetBids

Responses must be received no later than the date, time and location indicated above for the receipt of bids. Late submission of responses shall not be considered. Submittal of response by fax is not acceptable. Note: This bid does not constitute an order for the services specified.

Page 9 of 166 ends

16.F.

Page 297 of 593 ends

1 TABLE OF CONTENTS
I. BRIEF OVERVIEW ...................................................................................................... 2 II. GENERAL INSTRUCTIONS ....................................................................................... 2 III. SCOPE OF WORK .................................................................................................... 5 IV. BIDDER REQUIREMENTS ....................................................................................... 8 V. BID DOCUMENTS REQUIRED .................................................................................. 9 i. BID COVER SHEET ............................................................................................... 10 ii. BID SHEET ............................................................................................................ 11 iii. LOCAL VENDOR PREFERENCE ......................................................................... 11

Page 10 of 166 ends

16.F.

Page 298 of 593 ends

2 CITY OF HEMET

INVITATION FOR BID
NEW FORD F-550 WITH DUMP BED
I. BRIEF OVERVIEW
The City of Hemet is seeking a vendor to provide a new Ford F-550 with dump bed as specified in section III. below.

II. GENERAL INSTRUCTIONS

1. To be considered a responsive bid, Bidder must comply with all instructions and specifications as outlined in this Invitation for Bid (IFB). Bid response will be binding and firm.

2. It is the Bidder’s responsibility to examine and fully familiarize themselves with the specifications and the nature of the work required. The Bidder shall have no claim against the City based upon ignorance of the project’s requirements, site conditions, specifications, and/or Agreement provisions.

3. By submitting a bid, each Bidder expressly agrees to and accepts the following conditions:

a. The City’s specifications will become part of the agreement between the selected Bidder and the City of Hemet;

b. The City reserves the right to request further information from the Bidder, either in writing or orally, to establish any stated qualifications;

c. The City reserves the right to solely judge the Bidder’s representations and to determine whether the Bidder is qualified to undertake the project pursuant to the criteria set forth herein. The Bidder, by submitting a bid, expressly acknowledges and agrees that the judgment of the City as to whether the Bidder is qualified to perform the project, shall be final, binding and conclusive;

d. This bidding process does not commit the City to award any Agreement, and the City is not liable for any costs incurred by the Bidder in the preparation and submission of a bid;

4. False, incomplete, or unresponsive statements in connection with the bid may be sufficient cause for rejection of a bid.

5. The City reserves the right to change any part of these instructions to Bidders and specifications any time prior to the bid opening date and time. Any changes shall be communicated and recorded in the form of addenda via
PlanetBids notification and will
become part of the bid documents and subsequent Agreement. A Bidder’s failure to address the requirements of the addenda may result in rejection of their bid. If the City determines that a time extension is required for the bid, the addenda will indicate the new submission date and time.

Page 11 of 166 ends

16.F.

Page 299 of 593 ends

3 6. All bids accepted by the City shall become the exclusive property of the City. Upon opening, all bids accepted by the City shall become a matter of public record and shall be regarded as public and any blanket statement (i.e., regarding the entire pages, documents, or other non -specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required under California Public Records Act or otherwise by law (despite the Bidder’s request for confidentiality), the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof.

All records, documents, drawings, plans, specifications and other materials submitted by an applicant in its proposal, and during the course of any work awarded, shall become the exclusive property of the City of Hemet, and may be subject to release as a public record pursuant to the provisions of the California Public Records Act (Government Code section 6250 et seq.) The City of Hemet’s use and disclosure of its records are governed by this Act.

The City of Hemet will accept information clearly labeled “TRADE SECRET,” “CONFIDENTIAL,” or “PROPRIETARTY” as determined by the submitting party in accordance with the Act. However, under no circumstances, will the City of Hemet be responsible or liable to the applicant or any other party for the disclosure of any such labeled information.

The City of Hemet will not advise as to the nature or content of documents that may be entitled to protection from disclosure under the California Public Records Act, including interpretations of the Act or the definitions of “Trade Secret,” “Confidential, ” or “Proprietary.”

If litigation is brought under the California Public Records Act concerning documents submitted in response to this IFB, the appropriate parties shall indemnify, defend, and hold harmless the City of Hemet from all costs and expenses, including reasonable attorney fees, in such litigation.”

7. The Agreement shall be awarded to the lowest responsive and responsible Bidder. In determining whether a Bidder is responsible and responsive, the following will be considered:

Responsive:

a. All documents requested within this IFB have been completed and submitted before due date/time.

Responsible:

b. Bidders ability, capacity, and skill

c. Bidder’s facilities and resources

d. Bidder’s character and reputation

e. Bidder’s record of performance with the City

f. Bidder’s compliance with laws, regulations, guidelines, and orders governing prior contracts performed by the Bidder.

Page 12 of 166 ends

16.F.

Page 300 of 593 ends

4 8. Bidders shall not be allowed to take advantage of any errors or omissions in these instructions to Bidders or specifications. Revised instructions will be provided, if such error or omission is discovered and brought to the attention of the City.

9. Pricing shall include all federal, state, local and other taxes.

10. All general or bidding inquiries shall be directed to the Q & A Section of the Bid Page .

Questions will not be answered verbally or in an email.

11. Bid responses shall be delivered electronically on PlanetBids

12. Costs for developing bids are entirely the responsibility of the Bidder and shall not be chargeable to the City of Hemet.

13. If a Bidder takes exception to any part of these specifications as written, or as amended by any addenda subsequently issued, or the Agreement, they must do so in writing. Said exceptions must be submitted with the bid. Failure to do so will be construed as acceptance of all items of the specification and the Agreement.

14. City of Hemet may reject any or all bids and may waive any immaterial deviation in a bid.

City of Hemet's waiver of an immaterial defect shall in no way modify the IFB documents excuse the Bidder from full compliance with the specifications if he/she is awarded the Agreement. Bids referring to terms and conditions other than City of Hemet’s terms and conditions may be rejected as being non-responsive.

City of Hemet may make investigations as deemed necessary to determine the ability of the Bidder to perform the work, and the Bidder shall furnish to City of Hemet all such information and data for this purpose as requested by City of Hemet. City of Hemet reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy City of Hemet that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work specified.

15. Failure to execute the agreement within ten (10) business days shall be sufficient cause for voiding the award. Failure to comply with other requirements within the set time shall constitute failure to execute the Agreement. If the successful Vendor refuses or fails to execute the Agreement, the City of Hemet may award the Agreement to the next qualified highest ranked Vendor.

16. The City of Hemet requires that any Vendor doing business within the City limits must hold a valid City of Hemet business license, prior to conducting business with the City.

Information regarding how to obtain a business license is available at https://www.hemetca.gov/326/Business-Licenses Bidder must obtain a business license from the City prior to execution of the purchase order. Cost of a business license is $44.00.

Page 13 of 166 ends

16.F.

Page 301 of 593 ends

5 III. SCOPE OF WORK
New
Ford F-550 with dump bed to include:
_____
F-550

Page 14 of 166 ends

16.F.

Page 302 of 593 ends

6

Page 15 of 166 ends

16.F.

Page 303 of 593 ends

7

Page 16 of 166 ends

16.F.

Page 304 of 593 ends

8 Scelzi Dump Bed Specifications:

IV. BI

DDER REQUIREMENTS

1. The Wat
er/Wastewater Superintendent, Travis Holyoak, will be the City’s point of contact for delivery of this vehicle.

2. The point
of contact can be reached at 951-765-3826 or [email protected]

Page 17 of 166 ends

16.F.

Page 305 of 593 ends

9 3. The point of contact will be notified immediately when the Vendor is unable to deliver the vehicle within the agreed time frame.

V. BID DOCUMENTS REQUIRED

i. Bid Cover Sheet – This is to be used as the first page of the submission ii. Bid Sheet – This is where you will list you lump sum pricing and acknowledge any addenda.
iii. Local Vendor Preference (if applicable)
iv. Line Items – Fill in the Line Items tab on PlanetBids

Page 18 of 166 ends

16.F.

Page 306 of 593 ends

10 i. BID COVER SHEET

INVITATION FOR BID
NEW FORD F-550 WITH DUMP BED

Company Name:

Address:

Telephone #:

E-mail address:

City Business License Number:

Authorized Representative: (print)

Signature:

Title:

Vendor’s License No. & Class:

Federal Employer ID (EIN):

THE VENDOR IN SUBMITTING THIS BID MUST FILL IN THE INFORMATION ABOVE.

FAILURE TO DO SO MAY VOID YOUR BID
PFVT Motors, LLC dba Peoria Ford
9130 W Bell Rd Peoria, AZ 85382
480-696-5930
[email protected]
N/A- will apply if needed
Wesley Boswell
Government Account Manager
L00013423
20-3759783

Page 19 of 166 ends

16.F.

Page 307 of 593 ends

11 ii. BID SHEET FOR NEW FORD F-550 WITH DUMP BED
DATE: _______________________

TO THE CITY
OF HEMET, CALIFORNIA:

BIDDER (Firm
Name)
__________________________________
________________________
The undersigned hereby
proposes and agrees to furnish any and all materials,
equipment, tools, labor, and services for New Ford F-550 with Dump Bed as specified in Section II Sco pe of Services, and to perform all work in the manner and time prescribed therein.

The undersigned bidder
certifies that this proposal is made in good faith, without collusion or connection with any other person or persons bidding on the work.

LUMP SUM BASE B
ID (in words and in figures) $ __________________________ (in figures)
(in words)
The above amount
is the total amount bid for the entire contract work including all applicable taxes and hourly prevailing wage rates. Any alteration, erasure, or change must be clearly indicated and initialed by the bidder. The bidder agrees that if there are any discrepancies or questions in the figures, the CITY will use the lower figure despite the bidder’s intent. The City reserves the right to reject any and all bids and to waive any irregularities.

Addendum(a) N
o(s). _______________ has/have been received and is/are included in this proposal.

The undersigned bidder
declares that he has carefully examined the specifications and read the terms and conditions, and hereby proposes and agrees, if this bid is accepted, to furnish all material in accordance with the specifications and instructions, in the time and manner therein prescribed for the unit cost amounts set forth on this Bid Sheet. iii. LOCAL VE

NDOR PREFERENCE
10/21/2025
PFVT Motors, LLC dba Peoria Ford
92,011.29
1,2,3,4
Ninety two thousand, eleven dollars and 29/100 cents.

Page 20 of 166 ends

16.F.

Page 308 of 593 ends

12 CITY OF HEMET

LOCAL BUSINESS PREFERENCE AND CERTIFICATION REQUEST

(Bidders requesting a 5% Local Business Preference must enclose this form in the Bid Package)

NOTICE TO ALL BIDDERS: Section 2 -340 of the City of Hemet Municipal Code requires that a Local Preference be given to bidders who qualify as a local business.

A. Section 2 -340 requires qualified local vendors to be given preference in bid evaluation and award if a qualified local vendor does not make the lowest priced submission. Any qualified local vendor that makes a responsive submission shall have their submission price reduced by five percent for the purposes of comparison to the other submissions received by the City in making the determinations required by Section 2-334 through 2-336. If with this five percent reduction a qualifying local vendor would be awarded the contract, the qualifying local vendor shall be given the opportunity to amend their submission to price match the true lowest priced submission. If the qualifying local vendor agrees to price match then the contract shall be awarded to the local qualifying bidder.

B. For purposes of this section, a “qualified local vendor” shall be defined as:

1. An individual, partnership or corporation which has fixed facilities with employees located within the corporate limits of the City; and which is shown by the records maintained by the City’s finance department as having secured all necessary business licenses and as having paid all applicable fees and taxes imposed by the City;

2. It has a business street address (P.O. Box or residential address shall not suffice to establish a local preference);

3. All sales tax for the purchase of goods must be reported to the State through a business within the geographic boundaries of the City of Hemet.

C. For purposes of this section, “preference” shall mean the reduction factor applied to the bid of a local vendor that will allow the local vendor to amend their submission and price match the true lowest priced submission.

IMPORTANT NOTICE (Read before signing)

THE UNDERSIGNED HEREBY REQUESTS PREFERENCE AS A “LOCAL BUSINESS”.

THE “LOCAL BUSINESS PREFERENCE AND CERTIFICATION REQUEST” MUST BE SIGNED IN THE SAME NAME STYLE IN WHICH THE BIDDER IS LICENSED BY THE CITY OF HEMET.

Legal Name of Bidder(s) ___________________________________________ Address of Bidder _________________________________________________ Bidder City of Hemet Business License No. ___________________________ Signature of Authorized Bidder __________________________________

Page 21 of 166 ends

16.F.

Page 309 of 593 ends

2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Client Proposal
Prepared by:

Wesley Boswell
Office: 480-696-5930
Email: [email protected]
Date: 10/21/2025
Peoria Ford Commercial Fleet | 17338 N. 92nd Ave., Peoria, Arizona, 85382 Office: 623-523-6151
1Page 22 of 166

16.F.

Page 310 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs
Dimensions
• Conventional Capacity: 18,500 lbs. • GCWR: 30,000 lbs. • Fifth-wheel towing capacity: 21,800 lbs. • Gooseneck towing capacity: 21,900 lbs. • Front brake diameter: 15.4" • Rear brake diameter: 15.8" • Vehicle body length: 254.8" • Vehicle body width: 80.0" • Vehicle body height: 82.4" • Wheelbase: 169.0" • Vehicle turning radius: 24.2' • Front track: 74.8" • Rear track: 74.0" • Cab to axle: 84.0" • Rear tire outside width: 93.9" • Axle to end of frame: 47.2" • Frame section modulus: 12.7 cu.in. • Frame yield strength (psi): 50000.0 • Frame rail width: 34.2" • Front bumper to front axle: 38.3" • Front bumper to back of cab: 123.7" • Interior rear cargo volume: 11.6 cu.ft. • Max interior rear cargo volume: 11.6 cu.ft. • Total passenger volume: 64.6 cu.ft. • Headroom first-row: 40.8" • Leg room first-row: 43.9" • Shoulder room first-row: 66.7" • Hip room first-row: 62.5"
Powertrain
• Spark ignition system • 7.3L V-8 DEVCT variable valve control, engine with 335HP • Engine cylinders: V-8 • Injection Type: sequential MPI • Horsepower: 335 HP@3750 RPM • Torque: 468 lb.-ft.@3750 RPM • Radiator • Auxiliary power take-off • 10-speed automatic • Rear-wheel drive • Recommended fuel: regular unleaded • Driveline managed traction control * Mechanical limited slip differential
Fuel Economy and Emissions
• Gasoline secondary fuel type • Federal emissions
Suspension and Handling
• Firm ride suspension • Heavy-duty front shock absorbers • Heavy-duty rear shock absorbers Driveability
• 4-wheel disc brakes • Front and rear ventilated disc brakes • 4-wheel antilock (ABS) brakes • Four channel ABS brakes • Brake assist system • Hill Start Assist • Mono-beam rigid axle front suspension • Front anti-roll bar • Front coil springs • DANA M300 rigid axle rear suspension • Rear anti-roll bar • Leaf spring rear suspension • Hydraulic power-assist steering system • Re-circulating ball steering • 2-wheel steering system Body Exterior
• Trailer wiring harness * Running boards • 2 doors • Monotone paint • Black fender flares • Black side window trim • Black door handles • Black windshield trim • Black front bumper • 2 front tow hooks • Black front bumper rub strip • Black grille • Convex spotter in driver and passenger side door mirrors • Manual extendable trailer mirrors • Turn signal indicator in door mirrors • Black door mirrors • LT225/70RS19.5 AS BSW front and rear tires • 19.5 x 6-inch front and dual rear argent steel wheels
Convenience
• Power door locks with 2 stage unlocking • Keyfob activated door locks • All-in-one remote fob and ignition key • Auto- locking doors • Cruise control with steering wheel mounted controls • Day/Night rearview mirror • Power first-row windows • Fixed rear windshield • Front beverage holders • Locking glove box • 6 beverage holders • Instrument panel covered bin • Dashboard storage • Retained accessory power • Trip computer • Upfitter switches • Over the air updates • PRND in IP Comfort
2Page 23 of 166

16.F.

Page 311 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
• Manual climate control • Cabin air filter • Cloth headliner material • Full headliner coverage • Full vinyl floor covering • Full floor coverage • Urethane steering wheel • Manual tilting steering wheel • Manual telescopic steering wheel Seats and Trim
• Seating capacity: 3 • 40-20-40 split-bench front seat • Driver seat with 4-way directional controls • Front passenger seat with 4-way directional controls • Height adjustable front seat head restraints • Manual front seat head restraint control • Split-bench front seat • Front seat center armrest • Front seat armrest storage • Manual reclining driver seat • Manual driver seat fore/aft control • Manual reclining passenger seat • Manual passenger seat fore/aft control • Manual driver seat lumbar • Vinyl front seat upholstery
Entertainment Features
• 2 total number of 1st row displays • 8 inch primary display • Primary touchscreen display • AM/FM stereo radio • AM/FM • In-vehicle audio • AM radio • FM radio • Seek scan • SYNC 4 external memory control • Standard grade speakers • Speakers number: 4 • Steering wheel mounted audio controls • SYNC 4 voice activated audio controls • Speed sensitive volume • Fixed audio antenna
Lighting, Visibility and Instrumentation
• Digital/analog instrumentation display • Configurable instrumentation gauges • Trip odometer • Digital clock • Compass • Exterior temperature display • Driver information center • Tachometer • Oil pressure gauge • Engine/electric motor temperature gauge • Transmission fluid temperature gauge • Engine hour meter • Gauge cluster display size (inches):

4.20 • Light tinted windows • Reflector headlights • Halogen headlights • Autolamp auto on/off headlight control • Multiple enclosed headlights • Delay-off headlights • DRL preference setting • Variable intermittent front windshield wipers • Illuminated entry • Front reading lights • Variable instrument panel light • Daytime running lights • Cab clearance lights • Remote activated perimeter approach lighting • Fade interior courtesy lights Technology and Telematics
• SYNC 4 911 Assist emergency SOS system via mobile device • SYNC 4 handsfree wireless device connectivity • Smart device wireless mirroring • Ford App mobile app access • 5G Modem - Ford Connectivity Package mobile hotspot internet access • 2 USB ports
Safety and Security
• Driver front impact airbag • Seat mounted side impact driver airbag • Safety Canopy System curtain first-row overhead airbags • Cancellable front passenger air bag • Seat mounted side impact front passenger airbag • 6 airbags • Front height adjustable seatbelts • SecuriLock immobilizer • Ford Security Package (1-year included with activation) security system • Remote panic alarm • Lane Departure Warning • Pre-Collision Assist with Automatic Emergency Braking (AEB) forward collision mitigation * Rear mounted camera * Back-up alarm Dimensions
General Weights
Curb weight 6,623 lbs. Rear curb weight 2,901 lbs.

GVWR 18,000 lbs. Payload 11,310 lbs.

Trailering Weights
3Page 24 of 166

16.F.

Page 312 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
Fifth-wheel towing capacity 21,800 lbs. Gooseneck towing capacity 21,900 lbs.

Conventional capacity 18,500 lbs. GCWR 30,000 lbs.

Front Weights
Front curb weight 3,722 lbs. GAWR front 5,200 lbs.

Axle capacity front 7,000 lbs. Spring rating front 5,200 lbs.

Tire/wheel capacity front 7,500 lbs.

Rear Weights
GAWR rear 13,660 lbs. Axle capacity rear 13,660 lbs.

Spring rating rear 13,660 lbs. Tire/wheel capacity rear 15,000 lbs.

Off Road
Min ground clearance 8.6"
Exterior Measurements
Vehicle body length 254.8" Vehicle body width 80.0"
Vehicle body height 82.4" Wheelbase 169.0"
Front brake diameter 15.4" Rear brake diameter 15.8"
Rear frame height loaded 28.6" Rear frame height unloaded 34.4" Front track 74.8" Rear track 74.0"
Vehicle turning radius 24.2' Cab to axle 84.0"
Rear tire outside width 93.9" Axle to end of frame 47.2" Frame section modulus 12.7 cu.in. Frame yield strength (psi) 50000.0 Frame rail width 34.2" Front bumper to front axle 38.3" Front bumper to back of cab 123.7"
Interior Measurements
Interior rear cargo volume 11.6 cu.ft. Max interior rear cargo volume 11.6 cu.ft.

Interior Volume
Total passenger volume 64.6 cu.ft.

Headroom
Headroom first-row 40.8"
Legroom
Leg room first-row 43.9"
Shoulder Room
Shoulder room first-row 66.7"
Hip Room
Hip room first-row 62.5"
Powertrain
Engine
4Page 25 of 166

16.F.

Page 313 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
Engine 7.3L V-8 DEVCT variable valve control,
engine with 335HP
Valves per cylinder 2
Engine cylinders V-8 Injection type sequential MPI
Engine location Front mounted engine Ignition Spark ignition system Engine mounting direction Longitudinal mounted
engine
Engine block material Iron engine block
Cylinder head material Aluminum cylinder head
Engine Specs
Displacement 7.3L cc 445 cu.in.

Bore 4.21" Stroke 3.98"
Compression ratio 10.5 SAEJ1349 AUG2004 compliant
Engine Power
Horsepower 335 HP@3750 RPM Torque 468 lb.-ft.@3750 RPM Alternator
Alternator amps 190A Alternator type Regular duty alternator Battery
Battery amps 68Ah Battery type HD lead acid battery
Battery rating 750CCA Battery run down protection Battery run down protection
Engine Extras
Radiator Radiator Auxiliary power take-off Auxiliary power take-off Transmission
Transmission 10-speed automatic Transmission electronic control Transmission electronic control
Overdrive transmission Overdrive transmission Lock-up transmission Lock-up transmission First gear ratio 4.615 Second gear ratio 2.919
Third gear ratio 2.132 Fourth gear ratio 1.773
Fifth gear ratio 1.519 Sixth gear ratio 1.277
Reverse gear ratio 4.695 Seventh gear ratio 1
Eighth gear ratio 0.851 Ninth gear ratio 0.687
Tenth gear ratio 0.632 Stall ratio 1.97
Selectable mode transmission Selectable mode
transmission
Sequential shift control SelectShift Sequential shift
control
Transmission oil cooler Transmission oil cooler PTO transmission provision PTO transmission provision
Drive Type
Drive type Rear-wheel drive
Drivetrain
Axle ratio 4.88
5Page 26 of 166

16.F.

Page 314 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
Exhaust
Tailpipe Stainless steel single exhaust
Fuel
Fuel type regular unleaded
Fuel Tank
Fuel tank capacity 40.00 gal.

Drive Feature
* Limited slip differential Mechanical limited slip
differential
Traction control Driveline managed traction control
Fuel Economy and Emissions
Fuel Economy
Secondary fuel type Gasoline secondary fuel type
Emissions
Emissions Federal emissions
Suspension and Handling
Suspension
Suspension Firm ride suspension Front shock absorbers Heavy-duty front shock absorbers
Rear shock absorbers Heavy-duty rear shock
absorbers
Driveability
Brakes
Brake type 4-wheel disc brakes Ventilated brakes Front and rear ventilated disc brakes
ABS brakes Four channel ABS brakes ABS brakes 4-wheel antilock (ABS) brakes Brake Assistance
Hill start assist Hill Start Assist Brake assist system Brake assist system Front Suspension
Front anti-roll Front anti-roll bar Suspension ride type front Mono-beam rigid axle front suspension
Front Spring
Regular front springs Regular front springs Springs front Front coil springs Rear Spring
6Page 27 of 166

16.F.

Page 315 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
Springs rear Rear leaf springs Rear springs Heavy-duty rear springs Rear Suspension
Rear anti-roll Rear anti-roll bar Suspension type rear Leaf spring rear suspension Suspension ride type rear DANA M300 rigid axle rear
suspension
Steering
Steering Hydraulic power-assist steering system Steering type Re-circulating ball steering Steering type number of wheels 2-wheel steering
system
Exterior
Front Wheels
Front wheels diameter 19.5" Front wheels width 6"
Rear Wheels
Rear wheels diameter 19.5" Rear wheels width 6"
Front And Rear Wheels
Appearance argent Material steel
Front Tires
Aspect 70 Diameter 19.5"
Sidewalls BSW Speed S
Tread AS Type LT
Width 225mm Front wheel - RPM 647
Rear Tires
Aspect 70 Diameter 19.5"
Sidewalls BSW Speed S
Tread AS Type LT
Width 225mm Rear wheel - RPM 647
Body Exterior
Trailering
Towing wiring harness Trailer wiring harness * Towing brake controller Trailer brake controller Towing trailer sway Trailer sway control
Exterior Features
Number of doors 2 doors * Running boards Running boards Front splash guards Front splash guards * License plate front bracket Front license plate bracket
Body
7Page 28 of 166

16.F.

Page 316 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
Body panels Aluminum body panels with side impact
beams
Mirrors
Convex spotter Convex spotter in driver and
passenger side door mirrors
Turn signal in door mirrors Turn signal indicator in
door mirrors
Tires
Front tires LT load rating G Rear tires LT load rating G Wheels
Dual rear wheels Dual rear wheels
Convenience
Door Locks
Door locks Power door locks with 2 stage unlocking Keyfob door locks Keyfob activated door locks All-in-one key All-in-one remote fob and ignition key Auto door locks Auto-locking doors Cruise Control
Cruise control Cruise control with steering wheel
mounted controls
Rear View Mirror
Day/Night rearview mirror Day/Night rearview mirror
Exterior Mirrors
Door mirrors Power door mirrors Folding door mirrors Manual folding door mirrors Heated door mirrors Heated driver and passenger
side door mirrors
Front Side Windows
First-row windows Power first-row windows
Overhead Console
Overhead console Full overhead console Overhead console storage Overhead console storage Passenger Visor
Visor passenger mirror Passenger visor mirror
Power Outlets
12V power outlets 2 12V power outlets
Rear Windshield
Rear windshield Fixed rear windshield
Storage
Number of beverage holders 6 beverage holders Beverage holders Front beverage holders 8Page 29 of 166

16.F.

Page 317 of 593 ends

Prices and content availability as shown are subject to change and should be treated as estimates only. Actual base vehicle, package and option pricing may vary from this estimate because of special local pricing, availability or pricing adjustments not reflected in the dealer’s computer system. See salesperson for the most current information.

Prepared by: Wesley Boswell
10/21/2025 Peoria Ford Commercial Fleet | 17338 N. 92nd Ave. Peoria Arizona | 85382 2026 F-550 Chassis 4x2 SD Regular Cab 169" WB DRW XL (F5G) Price Level: 630
Selected Equip & Specs (cont'd)
Glove box Locking glove box Instrument panel storage Instrument panel covered bin
Dashboard storage Dashboard storage
Windows Feature
One-touch up window Driver and passenger one-
touch up windows
One-touch down window Driver and passenger one-
touch down windows
Miscellaneous
Trip computer Trip computer PRND in IP PRND in IP
Upfitter switches Upfitter switches Accessory power Retained accessory power Over the air updates Over the air updates
Comfort
Climate Control
Climate control Manual climate control Cabin air filter Cabin air filter Headliner
Headliner material Cloth headliner material Headliner coverage Full headliner coverage Floor Trim
Floor covering Full vinyl floor covering Floor coverage Full floor coverage Steering Wheel
Steering wheel material Urethane steering wheel Steering wheel telescopic Manual telescopic steering wheel
Steering wheel tilt Manual tilting steering wheel
Seats and Trim
Seat Capacity
Seating capacity 3
Front Seats
Front seat type Split-bench front seat Driver seat direction Driver seat with 4-way directional controls
Driver seat fore/aft control Manual driver seat fore/aft control
Passenger seat directionFront passenger seat with 4-
way directional controls
Split front seats 40-20-40 split-bench front seat Reclining passenger seat Manual reclining passenger seat
Passenger seat fore/aft control Manual passenger
seat fore/aft control
Front head restraints Height adjustable front seat
head restraints
Front head restraint control Manual front seat head
restraint control
Armrests front center Front seat center armrest
Armrests front storage Front seat armrest storage Reclining driver seat Manual reclining driver seat 9Page 30 of 166

16.F.

Page 318 of 593 ends