Hughson Citywide Public Safety and Maintenance Services CFD Page | 10 “Administrative Expenses” means the actual or reasonably estimated costs incurred by the Administrator acting for and on behalf of the CFD, to determine, levy and collect the Special Taxes, in responding to public inquiries regarding the Special Taxes, including general administrative costs, fees of consultants and legal counsel providing services related to the administration of the CFD; any amounts estimated or advanced by the City or CFD for any other administrative purposes; and, any other costs required to administer the CFD as determined by the Administrator.
“Administrator” means an official of the City, or designee thereof, responsible for determining the Special Tax Requirement and providing for the levy and collection of the Special Taxes.
“Annual Tax Escalation Factor” means in each Fiscal Year following the Base Year, an increase in the Maximum Special Tax in effect in the prior Fiscal Year by an amount equal to the Consumer Price Index (CPI), for San Francisco-Oakland-Hayward, All Urban Consumers (CPI-U) (month of February) as published by the Department of Labor’s Bureau of Labor Statistics, plus three percent (3.0%). If the CPI listed above is no longer published, the Administrator shall select a new index that is reasonably comparable to the CPI that is no longer published for purposes of calculating the Annual Tax Escalation Factor. “Annual Special Tax” means the total Special Tax actually levied against all Taxable Properties in the CFD for a particular fiscal year.
“Assessor’s Parcel” means a lot or parcel shown on a Stanislaus County Assessor’s Parcel Map with an assigned Assessor’s Parcel Number.
“Assessor’s Parcel Map” means an official map of the County Assessor of the County designating lots or parcels by an Assessor’s Parcel Number. “Assessor’s Parcel Number” or “APN” means a unique number assigned to an Assessor’s Parcel by the County Assessor for purposes of identifying a property. “Authorized Services” means those authorized maintenance activities and/or services, and expenses that may be funded by the CFD pursuant to the Act as amended, including, without limitation, those services authorized to be funded by the CFD as set forth in the documents adopted by the City Council at the time the CFD was formed. “Base Year” means the Fiscal Year beginning July 1, 2023 and ending June 30, 2024.
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 11 “Building Permit” means a single permit or set of permits required to construct an entire residential or non-residential structure, which is issued by the City prior to July 1st preceding the Fiscal Year in which the Special Tax is being levied. “Capital Replacement Reserve Fund” means a fund that shall be maintained for the CFD for each Fiscal Year to provide for the accumulation and holding of funds for long-term capital projects, asset replacement, or other large anticipated expenditures. “CFD” means the City of Hughson Citywide Public Safety and Maintenance Services Community Facilities District.
“City” means the City of Hughson.
“City Council” means the City Council of the City of Hughson, acting as the legislative body of the CFD.
“City Manager” means the City Manager of the City of Hughson or his or her designee. “Commercial Property” means, in any fiscal year, all Developed Property for which a building permit or use permit has been issued for a commercial (non-residential) establishment which includes, but is not limited to, retail stores, clothing stores, book stores, convenience stores, drug stores, professional services (i.e., barber shops, dry cleaners), restaurants, supermarkets, hospitals, movie theaters, appliance and electronics stores, home supply stores, auto parts stores, and other retail uses. The City shall make the determination if a Parcel is Commercial Property.
“County” means the County of Stanislaus, State of California. “County Assessor” means the Assessor of the County or his or her designee. “County Recorder” means the Recorder of the County or his or her designee. “Developed Property” means all Taxable Property for which a building permit was issued prior to the July 1st preceding the Fiscal Year in which the Special Tax is being levied. “Dwelling Unit” means each separate residential dwelling unit that comprises an independent facility capable of conveyance or rental separate from adjacent residential dwelling units. “Exempt Property” means all Assessors’ Parcels that are exempt from the Special Tax pursuant to law or Section E herein.
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 12 “Final Subdivision Map” means a subdivision of property creating residential or nonresidential buildable lots by recordation of a Final Subdivision Map or Parcel Map pursuant to the Subdivision Map Act (California Government Code Section 66410 et seq.), or recordation of a condominium plan pursuant to the California Civil Code 1352, that creates individual lots for which building permits may be issued without further subdivision. “Fiscal Year” means the period starting July 1st and ending on the following June 30th. “Industrial Property” means, in any Fiscal Year, a Developed Property for which a building permit or use permit has been issued for construction of an industrial, manufacturing, or warehousing structure. The City shall make the determination if a Parcel is Industrial Property.
“Land Use Class” means any of the parcel types listed in Table 1. “Multi-Family Property” means, in any Fiscal Year, all Parcels of Developed Property for which a building permit or use permit has been issued for construction of a residential structure with five (5) or more Units that share a single Assessor’s Parcel number, all of which are offered for rent to the general public and cannot be purchased by individual homebuyers.
“Maximum Special Tax” means the Maximum Special Tax, determined in accordance with Section C herein, which may be levied in any Fiscal Year on any Assessor’s Parcel of Taxable Property.
“Operating Fund” means a fund that shall be maintained for the CFD each Fiscal Year to provide for the maintenance and administration of the CFD, including a reserve fund to pay for delinquencies in the payment of Special Taxes.
“Operating Fund Requirement” means, for any Fiscal Year, an amount equal to costs associated with providing the Authorized Services and managing the CFD. In no event shall the Operating Fund Requirement in any Fiscal Year exceed the Special Tax Requirement for the CFD, without crediting the property owner’s annual special tax levy in an amount equal to the funds available that are in excess of the Special Tax Requirement. “Operating Reserve Fund” means the amount held in a fund that is used to pay for delinquencies in the payment of Special Taxes and any insufficiencies in funds to pay for the maintenance and administrative costs of the CFD for the first half of a Fiscal Year.
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 13 “Proportionately” means for Taxable Property that the ratio of the Annual Special Tax to the Maximum Special Tax is equal for all Taxable Property levied within each parcel classification as identified in Table 1 herein and within the boundaries of the CFD. “Public Property” means any property within the boundaries of the CFD which (i) is owned by a public agency or expected to be owned by the federal government, State of California, County, City, or other public agency at the time of formation, (ii) has been irrevocably offered for dedication to a public agency, or (iii) is designated with specific boundaries and acreage on a Final Subdivision Map as property which will be owned by a public agency.
For purposes of this definition, a public agency includes the federal government, the State of California, the County and/or the City.
“Single Family Attached Property” means, in any Fiscal Year, all Parcels of Developed Property for which a building permit was issued for construction of a residential structure consisting of two (2) or more Units that share common walls, have separate Assessor’s Parcel numbers assigned to them, and are offered as for-sale Units, including such residential structures that meet the statutory definition of a condominium contained in California Civil Code Section 1351.
“Single Family Detached Property” means, in any Fiscal Year, all Parcels of Developed Property for which a building permit was issued for construction of a Unit that does not share a common wall with another Unit.
“Special Tax” means the Special Tax levied in each Fiscal Year on each Assessor’s Parcel of Taxable Property to fund the Special Tax Requirement.
“Special Tax Requirement” means the amount, as determined by the Administrator for any Fiscal Year, to: (i) pay the costs of providing the Authorized Services during such fiscal year, (ii) pay Administrative Expenses associated with the Special Tax, (iii) establish or replenish the Operating Reserve Fund, (iv) establish or replenish the Capital Replacement Reserve Fund, (v) pay incidental expenses related to the Authorized Services as authorized pursuant to the Act, (vi) fund the shortfall, if any, in the Special Tax revenues collected in the preceding Fiscal Year where such shortfall resulted from delinquencies in the payment of Special Taxes in such Fiscal Year that exceeded the estimated Special Tax delinquency amount included in the Special Tax Requirement for the preceding Fiscal Year, less (vii) any excess funds available in the Operating Reserve Fund, Capital Replacement Reserve Fund, or other funds associated with the CFD as determined by the Administrator. “State” means the State of California.
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 14 “Taxable Property” means all of the Assessor’s Parcels within the boundaries of the CFD that are not Exempt Property.
“Tax Zone” means a mutually exclusive geographic area within which the Special Tax may be levied pursuant to this RMA. Additional Tax Zones may be created when property is annexed to the CFD and a separate Maximum Special Tax shall be identified for property within the new Tax Zone at the time of such annexation. All of the property within the proposed boundaries of the CFD and at the time of formation of the CFD are in Tax Zone No. 1.
“Tax Zone No. 1” means all property located within the area identified as Tax Zone No. 1, shown in Exhibit A of this RMA, subject to the interpretation of the Administrator as described in Section B.
“Undeveloped Property” means, in any Fiscal Year, all parcels of Taxable Property in the CFD for which a building permit for new construction was not issued prior to July 1st of the preceding Fiscal Year.
“Unit” means an individual single-family detached unit, or an individual attached residential unit within a duplex, triplex, four-plex, townhome, condominium, or apartment structure.
B. ASSIGNMENT TO CATEGORIES OF SPECIAL TAX
Each Fiscal Year, beginning with Fiscal Year 2023/24, using the definitions above, each Assessor’s Parcel within the boundaries of the CFD shall be classified by the Administrator as Taxable Property or Exempt Property. Commencing with Fiscal Year 2023/24 and for each subsequent fiscal year, Taxable Property shall be subject to the levy of Special Taxes pursuant to Section C below. In addition, in each such Fiscal Year, each Assessor’s Parcel of Taxable Property shall be further classified by the Administrator as Developed Property or Undeveloped Property.
C. MAXIMUM SPECIAL TAX RATE
The Maximum Special Tax for any Assessor’s Parcel classified as Developed Property or Undeveloped Property shall be determined by reference to the following table:
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 15 TABLE 1
Tax Zone No. 1 – Parkwood
Maximum Special Tax Rates By Land Use
Citywide Public Safety and Maintenance Services
Community Facilities District
Fiscal Year 2023/24
Taxable Property Type Maximum Special Tax
Single-Family Attached $997.82 per parcel
Single-Family Detached $997.82 per parcel
Multi-Family Residential $598.70 per unit
Condominium-Townhome $997.82 per parcel/unit
Commercial $3,991.28 per acre
Industrial $1,995.64 per acre
Undeveloped $249.46 per acre (1 acre minimum)
Multi-Family parcels are taxed at 60% of a single-family or condominium rate.
Commercial parcels are taxed at four times the single-family rate, per acre.
Industrial parcels are taxed at two times the single-family rate, per acre.
Undeveloped parcels are taxed at 25% of a single-family rate, per acre.
Under no circumstances will the Special Tax levied against any Assessor’s Parcel be increased because of delinquency or default by the owner of any other Assessor’s Parcel within the CFD by more than ten percent (10%) above what such Special Tax would have been in the absence of delinquencies.
Escalation of the Maximum Special Tax
Each Fiscal Year following the Base Year, the Maximum Special Tax shall be increased in accordance with the Annual Tax Escalation Factor as provided in this Rate and Method of Apportionment of Special Tax.
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 16 D. METHOD OF APPORTIONMENT OF SPECIAL TAX
Commencing with Fiscal Year 2023/24, and for each subsequent Fiscal Year, the Administrator shall levy the Special Tax at the rates established in Section C on all Taxable Property within the boundaries of the CFD until the total amount of Special Tax levied equals the Special Tax Requirement. The Special Tax shall be levied each Fiscal Year as follows:
1. The Special Tax shall be levied proportionately on each Assessor’s Parcel of Developed Property up to one hundred percent (100%) of the applicable Maximum Special Tax.
2. If additional monies are needed to satisfy the Special Tax Requirement after Developed Property has been levied one hundred percent (100%) of their Maximum Special Tax, the remaining amount needed to satisfy the Special Tax Requirement shall be levied proportionately on each Assessor’s Parcel of Undeveloped Property at up to one hundred percent (100%) of the Maximum Special Tax.
E. EXEMPTIONS
The Administrator shall classify the following as Exempt Property: Public Property and Assessor’s Parcels with public or utility easements making impractical their utilization for any use other than the purposes set forth in the easement.
If the use of an Assessor's Parcel changes so that such Assessor's Parcel is no longer eligible to be classified as Exempt Property under this section, such Assessor’s Parcel shall be deemed to be Taxable Property.
F. PREPAYMENT OF SPECIAL TAX
The Maximum Special Tax may not be prepaid and shall continue to be levied in accordance with Section D of this Rate and Method of Apportionment of Special Tax on an annual basis on all Taxable Property in the CFD for the purpose of funding the ongoing Authorized Services.
City of Hughson
Citywide Public Safety and Maintenance Services CFD
Hughson Citywide Public Safety and Maintenance Services CFD Page | 17 G. TERM OF THE SPECIAL TAX
Parcels in the CFD will remain subject to the Special Tax in perpetuity, unless and until such time the City determines the revenues are no longer needed, in which case the Special Tax shall cease to be levied and the City shall direct the County Recorder to record a Notice of Cessation of Special Tax. Such notice will state that the obligation to pay the Special Tax has ceased and that the lien imposed by the Notice of Special Tax Lien is extinguished. The Notice of Cessation of Special Tax shall additionally identify the book and page of the Book of Maps of Assessment and Community Facilities Districts where the map of the boundaries of the CFD is recorded.
H. REVIEW/APPEALS
The Administrator may establish such procedures, as it deems necessary to undertake the review of any such appeal of any property owner. The Administrator shall interpret this Rate and Method of Apportionment of Special Tax and make determinations relative to the annual administration of the Special Tax and any property owner appeals, as herein specified.
Any property owner who believes that the amount of the Special Tax levied on their Assessor’s Parcel is in error shall first consult with the Administrator regarding such error.
If following such consultation, the Administrator determines that an error has occurred, the Administrator or designee shall take any of the following actions to correct the error:
• Amend the Special Tax levy on the property owner’s Assessor’s Parcel(s) for the current fiscal year,
• Require the CFD to reimburse the property owner for the amount of an overpayment to the extent of available CFD funds, or,
• Grant a credit against, eliminate or reduce the future Special Taxes on the property owner’s Assessor’s Parcel(s) for overpayment for the current fiscal year.
Citywide Public Safety and Maintenance Services CFD Page | 18 If following such consultation and action (if any by the Administrator), the property owner believes such error still exists, such person may file a written notice with the City Manager appealing the amount of the Special Tax levied on such Assessor's Parcel. If following such consultation and action (if any by the City Manager), the property owner believes such error still exists, such person may file a written notice with the City Council appealing the amount of the Special Tax levied on such Assessor's Parcel.
If the City Manager, City Council or designee determines an error exists, the CFD Administrator shall take any actions as described in this section, in order to correct the error. The decision of the City Council shall be final and binding to all persons.
I. INTERPRETATIONS
The City reserves the right to make minor administrative and technical changes to this document that does not materially affect the Rate and Method of Apportionment of Special Taxes. In addition, the interpretation and application of any section of this document shall be left to the City’s discretion. The City may make interpretations by ordinance or resolution for purposes of clarifying any vagueness or ambiguity in this Rate and Method of Apportionment of Special Tax.
J. MANNER OF COLLECTION
The annual Special Tax shall be collected in the same manner and at the same time as ordinary ad valorem property taxes; provided, however, that the Administrator, may, at the sole discretion of the City, directly bill the Special Tax, and may collect the Special Taxes at a different time or in a different manner as necessary to meet the financial obligations of the CFD or as otherwise determined appropriate by the Administrator.
K. REPEAL OF SPECIAL TAX
If the levy of the Special Tax is repealed by initiative or any other action participated in by the property owners of Assessor’s Parcels in the CFD, the City shall cease to levy the Special Tax and shall cease to be obligated to provide the Authorized Services for which the Special Tax was levied. The obligation to provide the Authorized Services previously funded by the repealed Special Tax shall become the joint obligations of the property owners of Assessor’s Parcels within the CFD.
Citywide Public Safety and Maintenance Services CFD
APPENDIX A
A copy of the Boundary Map for the CFD is shown on the following page.
E HATCH RD
S SANTA FE AVE
APN
018-017-002
APN
018-017-014
APN
018-017-010
PROPOSED BOUNDARY MAP
City of Hughson
Community Facilities District
Public Safety and Maintenance Services
County of Stanislaus, California
Sheet __1__ of __1__
PROPOSED BOUNDARY OF
CITY OF HUGHSON
PUBLIC SAFETY AND MAINTENANCE SERVICES
COMMUNITY FACILITIES DISTRICT
COUNTY OF STANISLAUS, STATE OF CALIFORNIA
S SANTA FE AVE
E HATCH RD
E WHITMORE AVE
M
O
U
N
TA
NI V EI W
R
D
GEER
R
D
E SERVICE RD
VICINITY MAP
LOCATION
REFERENCE THE STANISLAUS COUNTY ASSESSOR'S MAPS FOR A DETAILED DESCRIPTION OF PARCEL LINES AND DIMENSIONS
CLERK'S MAP STATEMENT
FILED IN THE OFFICE OF THE CITY CLERK OF THE CITY OF HUGHSON THIS ______ DAY OF ______________ 2022. _____________________________________________
CITY CLERK OF THE CITY OF HUGHSON
CLERK'S MAP STATEMENT
I HEREBY CERTIFY THAT THE AREA SHOWN ON THIS MAP OF THE PROPOSED COMMUNITY FACILITIES DISTRICT,
PUBLIC SAFETY AND MAINTENANCE SERVICES, CITY OF HUGHSON, COUNTY OF STANISLAUS, STATE OF CALIFORNIA,
WAS APPROVED BY THE CITY COUNCIL OF THE CITY OF HUGHSON AT A REGULARLY SCHEDULED MEETING THEREOF, HELD ON THE ____ DAY OF ______________ 2022. BY ITS RESOLUTION NO. _____________. _____________________________________________
CITY CLERK OF THE CITY OF HUGHSON
COUNTY RECORDER'S FILING STATEMENT
FILED THIS ______ DAY OF ________________ 2022. AT THE HOUR OF ___________ O'CLOCK ____.M. IN BOOK _______ OF MAPS OF ASSESSMENT AND COMMUNITY FACILITIES DISTRICTS PAGE NO. _____ IN THE OFFICE OF THE COUNTY RECORDER IN THE COUNTY OF STANISLAUS, STATE OF CALIFORNIA.
DONNA LINDER
BY: ___________________________________________________ DEPUTY
FILE: ___________________________________________________
CLERK RECORDER OF THE COUNTY OF STANISLAUS, CALIFORNIA
1 " = 200 '
³ HARRIS & ASSOCIATES
1401 WILLOW PASS RD, SUITE 500
CONCORD, CALIFORNIA 94520
800-827-4901
Legend
Tax Zone1 Boundary
Parcel Boundary
City Boundary & CFD Future Annexation Area
Citywide Public Safety and Maintenance Services CFD
APPENDIX B
The 2023/24 Special Tax Roll for the District is shown below. At the time of the writing of this Report, the development had not been split to its individual APN’s. Lot numbers are shown based on the tract map provided by the developer.
Fiscal Year 2023/24 Special Tax Roll
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
1 018-017-002 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 2 018-017-010 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 3 018-017-014 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 4 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 5 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 6 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 7 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 8 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 9 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 10 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 11 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 12 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 13 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 14 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 15 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 16 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 17 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 18 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 19 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 20 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 21 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 22 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 23 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 24 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 25 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 26 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 27 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 28 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 29 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 30 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 31 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
32 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 33 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 34 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 35 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 36 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 37 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 38 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 39 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 40 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 41 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 42 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 43 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 44 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 45 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 46 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 47 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 48 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 49 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 50 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 51 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 52 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 53 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 54 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 55 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 56 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 57 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 58 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 59 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 60 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 61 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 62 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 63 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 64 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 65 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 66 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 67 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 68 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 69 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 70 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 71 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 72 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 73 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 74 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
75 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 76 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 77 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 78 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 79 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 80 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 81 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 82 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 83 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 84 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 85 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 86 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 87 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 88 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 89 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 90 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 91 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 92 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 93 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 94 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 95 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 96 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 97 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 98 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 99 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 100 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 101 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 102 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 103 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 104 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 105 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 106 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 107 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 108 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 109 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 110 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 111 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 112 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 113 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 114 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 115 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 116 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 117 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
118 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 119 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 120 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 121 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 122 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 123 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 124 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 125 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 126 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 127 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 128 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 129 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 130 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 131 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 132 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 133 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 134 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 135 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 136 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 137 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 138 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 139 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 140 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 141 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 142 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 143 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 144 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 145 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 146 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 147 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 148 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 149 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 150 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 151 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 152 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 153 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 154 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 155 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 156 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 157 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 158 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 159 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 160 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
161 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 162 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 163 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 164 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 165 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 166 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 167 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 168 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 169 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 170 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 171 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 172 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 173 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 174 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 175 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 176 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 177 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 178 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 179 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 180 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 181 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 182 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 183 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 184 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 185 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 186 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 187 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 188 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 189 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 190 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 191 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 192 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 193 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 194 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 195 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 196 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 197 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 198 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 199 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 200 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 201 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 202 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 203 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
204 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 205 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 206 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 207 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 208 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 209 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 210 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 211 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 212 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 213 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 214 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 215 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 216 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 217 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 218 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 219 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 220 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 221 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 222 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 223 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 224 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 225 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 226 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 227 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 228 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 229 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 230 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 231 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 232 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 233 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 234 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 235 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 236 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 237 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 238 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 239 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 240 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 241 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 242 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 243 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 244 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 245 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 246 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
247 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 248 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 249 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 250 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 251 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 252 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 253 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 254 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 255 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 256 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 257 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 258 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 259 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 260 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 261 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 262 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 263 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 264 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 265 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 266 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 267 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 268 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 269 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 270 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 271 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 272 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 273 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 274 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 275 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 276 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 277 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 278 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 279 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 280 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 281 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 282 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 283 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 284 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 285 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 286 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 287 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 288 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 289 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 Citywide Public Safety and Maintenance Services CFD
Lot
No.
CURRENT
APN OWNER
PARCEL
TYPE UNITS
EDU
FACTOR
TOTAL
EDU'S
MAX.
RATE
PER EDU
2023/24
MAXIMUM
SPECIAL TAX
290 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 291 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 292 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 293 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 294 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 295 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 296 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 297 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 298 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 299 KB Home, North Bay SFV 1.00 1.00 1.00 $997.82 $997.82 A KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
B KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
C KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
D KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
E KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
F KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
G KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
H KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
I KB Home, North Bay EXE 0.00 0.00 0.00 $997.82 $0.00
TOTALS: 299.00 299.00 $298,348.18
Citywide Public Safety and Maintenance Services CFD
APPENDIX C
The owner of the Parkwood development has signed and submitted a Petition to Form a CFD with Waivers. A copy of the signed Petition is shown on the following page.
PETITION
(WITH WAIVERS)
TO ESTABLISH A COMMUNITY FACILITIES DISTRICT
1. Petitioner. This petition is submitted by the persons (whether one or more) identified below as, or for, the fee title owners of the parcel(s) of land identified below. By submitting this petition, such persons warrant to the City of Hughson ("City") that they are authorized to execute this petition.
2. Proceedings Requested. The Petitioner asks that the City Council of the City undertake and complete proceedings under Government Code Section 53319 to create a community facilities district to be designated "City of Hughson, Citywide Public Safety and Maintenance Services Community Facilities District, (the "CFD"), and to levy special taxes therein.
3. Boundaries of CFD. The Petitioner asks that the territory to be included in the boundaries of the CFD consist of the parcel(s) of land identified below.
4. Purpose of CFD. The Petitioner asks that the CFD be created and the special taxes be levied to pay for the maintenance of streets, streetlights, sidewalks, storm drain and drainage facilities, parks, landscaping, water and sewer lines, and a community pool, along with police and emergency services, and to pay other costs as shall be more fully identified during the course of the legal proceedings to form the CFD.
5. Elections. The Petitioner asks that the election, to be held under the Act to authorize the special taxes and to establish any appropriations limits for the CFD, be consolidated into a single election, that the election be conducted by the City and its officials using mailed or hand-delivered ballots, and that such ballots be opened and canvassed and the results certified at the same meeting of the City Council as the public hearing on the CFD under the Act or as soon thereafter as possible.
6. Waivers. To expedite the completion of the proceedings for the CFD, all notices of hearings and all notices of election, applicable waiting periods under the Act for special elections, and all ballot analysis or arguments for the election are hereby waived.
By executing this petition, the person(s) below agree(s) to all of the above.
The Property that is subject to this petition is identified as Stanislaus County Assessor's Parcel Number(s):
018-017-002; 018-017-010 & 018-017-014
The Property consists of a total of 56.04 acres.
The record owner of the Property is: KB Home North Bay
Executed on: , 2022 By:
Title:
The address to which the ballots for the CFD elections are to be sent:
KB Home North Bay
Attn: Julie Nebozuk
4830 Business Center Drive, Suite 150
Fairfield, CA 94534
Senior Project Manager
8/30
Meeting Date: January 23, 2023
Subject: Introduce and Waive the First Reading of Ordinance No. 2023-01, Amending the Hughson Municipal Code
Pertaining to Title 15 Building Code Regulations
Presented By: Carla C. Jauregui, Community Development Director Approved By: _________________________
City Manager
Recommendation:
Introduce and waive the first reading of Ordinance No. 2023-01, amending Title 15 Building and Construction of the Hughson Municipal Code, and adopting by reference, the California Building Standards, 2022 Edition, Title 24 of the California Code of Regulations, with amendments and other uniform codes.
Background & Overview:
The model codes update every three years to improve and adjust to the newest materials, methods of construction, and technological advances in the industry. The California Building Standards Commission’s adoption of the 2022 California Building Code (CBC) comes after a comprehensive multi-state agency and stakeholder update of the 2019 California Building Code.
The objective is to produce a practical building code that ensures public safety first and foremost while implementing the most efficient technology available to conserve the State’s natural resources and energy use. California’s Building Code applies to every commercial and residential structure in the State.
The new 2022 CBC contains twelve parts that incorporate public health, life safety, and general welfare standards used in the design and construction of buildings in California. These parts incorporate the latest national standards in the International Building, Residential and Fire Codes, California Green Building Code, California Energy Code, National Electrical Code and the Uniform Mechanical and Plumbing Codes.
CITY COUNCIL AGENDA ITEM NO. 5.2
SECTION 5: PUBLIC HEARING
Health and Safety Code Section 18941.5 mandates that the Building Standards contained in the 2022 CBC shall be effective 180 days after publication by the California Building Standards Commission. If these codes are not adopted by Ordinance, they become effective by default without any amendments. The proposed effective date for the City of Hughson will be January 1, 2023. As part of the adoption process, this department has made every effort to notify all affected parties of the proposed changes.
Discussion:
Along with the usual Energy and Green code updates, below are a few noteworthy updates:
• Permit expiration has been extended from 6 months to 12 months. Every permit shall remain valid if the work on the site is commenced within 12 months after its issuance.
• Aging-in-place design and fall prevention have been added for new residential construction. Added to address specific design elements to facilitate access to operational features and to allow people to stay longer in their homes as they age.
• Expanding Electric Vehicle Charging requirements to install EV charging receptacles and chargers in new multifamily dwellings, hotels, and motels.
The second reading of the Ordinance will return to Council on February 14, 2023.
Fiscal Impact:
There are no fiscal impacts with the adoption of this ordinance and code amendment.
1679890-1
CITY OF HUGHSON
CITY COUNCIL
ORDINANCE NO 2023-01
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HUGHSON AMENDING THE HUGHSON MUNICIPAL CODE PERTAINING TO TITLE 15
BUILDING CODE REGULATIONS
WHEREAS, the City Council of the City of Hughson wishes to provide the highest level of building safety measures possible to its citizens; and WHEREAS, Section 17922 of the California Health & Safety Code establishes Title 24 of the California Code of Regulations, also referred to as the California Building Code (“CBC”), as the Statewide Uniform Building Code; and
WHEREAS, the City Council of the City of Hughson desires to update Title 15 of the Hughson Municipal Code in order conform to the State of California’s newly updated 2022 CBC as required by law.
NOW, THEREFORE THE CITY COUNCIL OF THE CITY OF HUGHSON
DOES ORDAIN AS FOLLOWS:
Section 1: That Title 15, Building and Construction of the City of Hughson Municipal Code be amended as stated in Attachment “A”, attached hereto, and made a part hereof by this reference.
Section 2: Purpose and Authority: The purpose of this Ordinance is to adopt by reference the 2022 edition of the California Building Standards Code, Title 24, Parts 1, 2, 2.5, 3, 4, 5, 6, 8, 9, 10, 11, & 12 of the California Code of Regulations, subject to the definitions, clarifications, and the amendments set forth in this Ordinance. The purpose of this Ordinance is also to provide minimum requirements and standards for the protection of the public safety, health, property and welfare of the City of Hughson. This Ordinance is adopted under the authority of Government Code Subsection 50022.2 and Health and Safety Code Section 18941.5.
Section 3: Intent: This ordinance is not intended to impose, and shall not be construed or given effect in a manner that imposes, upon the city or any officer or employee thereof, a mandatory duty of care toward persons and property within or without the city so as to provide a basis of civil liability for damages, except as otherwise imposed by law.
Section 4: Affect: If any provision of this ordinance or application thereof to any person or circumstances is held invalid, such invalidity shall not affect other provisions or applications of the ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this ordinance are severable. The city council hereby declares that it would have adopted this ordinance irrespective of the validity of any particular portion thereof. 1679890-1
Section 5: Effective Date and Publication: This Ordinance shall become effective 30 days after its final passage and adoption, provided it is published in a newspaper of general circulation at least fifteen (15) days prior to its effective date.
The foregoing Ordinance was introduced, and the title thereof read the regular meeting of the City Council of the City of Hughson held on January 23, 2023, and by a vote of the Council members present, further reading was waived.
On motion of councilperson _____, seconded by councilperson _______, the second reading of the foregoing ordinance was waived, and this ordinance was duly passed by the City Council of the Hughson City Council at a regular meeting thereof held on February 14, 2023, by the following vote:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
GEORGE CARR, Mayor
ATTEST:
Ashton Gose, City Clerk
1679890-1
Attachment “A”
Article I. General
15.04.010 Purpose.
The purpose of this title is to provide for the administration and enforcement of the California Code of Regulations Title 24 codes, the technical codes, and other approved codes adopted by the city of Hughson as part of this title. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07- 08 § 1, 2007)
15.04.011 Scope.
The provisions of this title shall serve as the administrative, organizational and enforcement rules and regulations for the California Code of Regulations Title 24 which regulate site preparation and construction, alteration, moving, demolition, repair, use and occupancy of buildings, structures and building service equipment within the city. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.012 Compliance with title provisions required.
It shall be unlawful for any person to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy or maintain any building or structure in the city, or cause or permit or suffer the same to be done, in violation of this title or in violation of any of the provisions of the codes adopted hereunder. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.013 Cross-references to technical code.
The provisions of this chapter and the Title 24 codes contain cross-references to the provisions of the international codes, the uniform codes or other approved codes promulgated by industry authorities in order to facilitate reference and comparison to those provisions. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.014 Application to the city.
The name “city of Hughson” is inserted in any and all blank spaces provided in the California Building Code for the name of the city adopting such code, and wherever the word “city” as “jurisdiction” appears in the code or is otherwise used, it shall mean and refer to the city of Hughson. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007) 1679890-1
15.04.015 Unsafe buildings, structures and equipment.
Buildings, structures and equipment that are or hereafter become unsafe, unsanitary or deficient because of inadequate means of egress, inadequate light and ventilation, or which constitute a fire hazard, or are otherwise dangerous to human life or the public welfare, or that involve illegal or improper occupancy or inadequate maintenance, shall be deemed unsafe. A vacant structure that is not secured against entry shall be deemed unsafe.
All such unsafe buildings, structures or equipment are hereby declared to be public nuisances and shall be abated by repair, rehabilitation, demolition or removal in accordance with the authorities and procedures set forth in Chapter 1.17 HMC. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
Article II. Organization and Enforcement
15.04.020 Powers and duties of building official.
A. The building official is hereby authorized and directed to enforce all the provisions of this code. For such purposes, the building official shall have the powers of a law enforcement officer.
B. The building official shall have the power to render interpretations of this code and to adopt and enforce rules and supplemental administrative regulations to clarify the application of its provisions. Such interpretations, rules and regulations shall be in conformance with the intent and purpose of this code.
C. The city hereby delegates the enforcement of building standards relating to fire and panic safety and other regulations of the State Fire Marshal as they relate to Group R, Division 3 dwellings, as described in Section 310.1 of Part 2 of the California Building Standards Code, to the chief building official of the city, or his or her authorized representative.
D. In accordance with prescribed procedures and with the approval of the appointing authority, the building official may appoint such number of technical officers and inspectors and other employees as shall be authorized from time to time. The building official may deputize such inspectors or employees as may be necessary to carry out the functions of the code enforcement agency.
E. Whenever any work is being done contrary to the provisions of this code, or other pertinent laws or ordinances implemented through the enforcement of this code, the building official may order the work stopped by notice in writing served on any persons engaged in the doing or causing of such work to be done, and any such persons shall forthwith stop such work until authorized by the building official to proceed with the work.
F. The building official has the authority and powers necessary to determine whether a violation of the code exists and the authority to take appropriate action to gain compliance with the provisions of this code and applicable state codes. These powers include the power to issue administrative citations, notice and orders, correction notices, stop work orders and civil 1679890-1
penalties and administrative fines authorized under Chapter 1.17 HMC. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.021 Right of entry.
When it is necessary to make an inspection to enforce the provisions of this code, or when the building official has reasonable cause to believe that there exists in a building or upon a premises a condition that is contrary to or in violation of this code that makes the building or premises unsafe, dangerous or hazardous, the building official may enter the building or premises at reasonable times to inspect or to perform the duties imposed by this code; provided, that if such building or premises be occupied that credentials be presented to the occupant and entry requested. If such building or premises be unoccupied, the building official shall first make a reasonable effort to locate the owner or other person having charge or control of the building or premises and request entry. If entry is refused, the building official shall have recourse to the remedies provided by law to secure entry. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.022 Occupancy violations.
Whenever any building or structure or equipment therein regulated by this code is being used contrary to the provisions of this code, the building official may order such use discontinued and the structure, or portion thereof, vacated by notice served on any person causing such use to be continued. Such person shall discontinue the use within the time prescribed by the building official after receipt of such notice to make the structure, or portion thereof, comply with the requirements of this code. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.023 Liability.
This code shall not be construed to relieve from or lessen the responsibility of any person owning, operating or controlling any building or structure for any damages to persons or property caused by defects, nor shall the code enforcement agency or its parent jurisdiction be held as assuming any such liability by reason of the inspections authorized by this code or any permits or certificates issued under this code. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.024 Modifications.
When there are practical difficulties involved in carrying out the provisions of this code, the building official may grant modifications for individual cases. The building official shall first find that a special individual reason makes the strict letter of this code impractical, and that the modification is in conformance with the intent and purpose of this code and that such modification does not lessen any fire-protection requirements or any degree of structural integrity. The details of any action granting modifications shall be recorded and entered in the files of the code enforcement agency. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07- 08 § 1, 2007)
1679890-1
15.04.025 Alternate materials, alternate design, and methods of construction.
The provisions of this code are not intended to prevent the use of any material, alternate design or method of construction not specifically prescribed by this code, provided any alternate has been approved and its use authorized by the building official.
The building official may approve any such alternate, provided the building official finds that the proposed design is satisfactory and complies with the provisions of this code and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this code in suitability, strength, effectiveness, fire resistance, durability, safety and sanitation.
The building official shall require that sufficient evidence or proof be submitted to substantiate any claims that may be made regarding its use. The details of any action granting approval of an alternate shall be recorded and entered in the files of the code enforcement agency. (Ord. 13- 04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.026 Tests.
Whenever there is insufficient evidence of compliance with any of the provisions of this code or evidence that any material or construction does not conform to the requirements of this code, the building official may require tests as proof of compliance to be made at no expense to this jurisdiction.
Test methods shall be as specified by this code or by other recognized test standards. If there are no recognized and accepted test methods for the proposed alternate, the building official shall determine test procedures.
All tests shall be made by an approved agency. Reports of such tests shall be retained by the building official for the period required for the retention of public records. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.027 Cooperation of other officials and officers.
The building official may request, and shall receive, the assistance and cooperation of other officials of this jurisdiction so far as is required in the discharge of the duties required by this code or other pertinent law or ordinance. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.028 Violation – Penalties.
Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, enlarges, alters, repairs, moves, improves, removes, converts, demolishes, equips, uses, occupies or maintains any building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of this code, shall be subject to penalties prescribed under Chapter 1679890-1
1.17 HMC which are in addition to all other legal remedies, civil or criminal, which may be pursued by the city. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007) Article III. Codes Adopted
15.04.030 Title 24 codes adopted.
A. Adoption of Part 1 – 2013 2022 California Building Standards Administrative Code. In book form, as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson building standards administrative code. A copy of said code is on file in the office of the building official of the city.
B. Adoption of Part 2 – 2013 2022 California Building Code. In book form, in two volumes as published by the International Code Council, together with Appendices Chapter G – FloodResistant Construction, Chapter H – Signs, Chapter I – Patio Covers, Chapter J – Grading, Chapter K – Central Valley Flood Protection Plan, and Chapter P – Emergency Housing, and subsequent additions and editions thereto as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson building code. A copy of said code is on file in the office of the building official of the city.
C. Adoption of Part 2.5 – 2013 2022 California Residential Code. In book form, as amended in this title and including all the following appendices with the exception of Appendix AL-Permit Fees, and subsequent additions and editions thereto thereto: Appendix H – Patio Covers; Appendix J – Existing Building, as published by the International Code Council as adopted and amended by the California Building Standards Commission is hereby adopted as the city of Hughson residential code. A copy of said code is on file in the office of the building official of the city.
D. Adoption of Part 3 – 2013 2022 California Electrical Code including appendices. In book form, as published by the National Fire Protection Association as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson electric code. A copy of said code is on file in the office of the building official of the city.
E. Adoption of Part 4 – 2013 2022 California Mechanical Code. In book form as amended in this title and including all following appendices thereto: Appendix Chapter 1 – Administration with amendments; Appendix A – UMC Standard – Nos. 2-2, 6-2, and 6-5; Appendix B, as published by the International Association of Plumbing and Mechanical Officials as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson mechanical code. A copy of said code is on file in the office of the building official of the city.
F. Adoption of Part 5 – 2013 2022 California Plumbing Code. In book form as amended in this title and including all the following appendices thereto: Appendix Chapter 1 – Administration with amendments; Appendix A; Appendix B; Appendix D; Appendix G; Appendix I; Appendix K, as published by the International Association of Plumbing and Mechanical Officials as adopted and amended by the California Building Standards Commission, is hereby adopted as 1679890-1
the city of Hughson plumbing code. A copy of said code is on file in the office of the building official of the city.
G. Adoption of Part 6 – 2013 2022 California Energy Code. In book form, as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson energy code. A copy of said code is on file in the office of the building official of the city.
H. Adoption of Part 8 – 2013 2022 California Historical Code. In book form, as amended by the Hughson Fire Protection District, and as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson historical code. A copy of said code is on file in the office of the building official of the city.
I. Adoption of Part 9 – 2013 2022 California Fire Code. In book form, as amended by the Hughson Fire Protection District and as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson fire code. A copy of said code is on file in the office of the building official of the city.
J. Adoption of Part 10 – 2013 2022 California Existing Building Code. In book form, as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson’s existing building code. A copy of said code is on file in the office of the building official of the city.
K. Adoption of Part 11 – 2013 2022 California Green Standards Code and the Tier 1 Provisions of Appendix A4. In book form, as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson green standards code. A copy of said code is on file in the office of the building official of the city.
L. Adoption of Part 12 – 2013 2022 California Referenced Standards Code. In book form, as published by the International Code Council as adopted and amended by the California Building Standards Commission, is hereby adopted as the city of Hughson referenced standards code. A copy of said code is on file in the office of the chief building official of the city. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
M. Adoption of Uniform Housing Code 1997 Edition.
For the purpose of prescribing regulations governing the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area and maintenance of all buildings and structures within the City, the Uniform Housing Code, 1997 Edition Conference of Building Officials (Title 25 of the California Code of Regulations pursuant to Sections 17958, 17958.5, 17958.7, 17958.9 and 17959 of the California Health and Safety Code), published by the International, and subsequent additions and editions thereto, one copy of which is on file in the office of the City Clerk for public record and inspection, is hereby adopted by reference and made part of this chapter as though 1679890-1
set forth in this chapter in full, subject, however, to the amendments, additions and deletions set forth in this chapter, and said Code shall be known as the Housing Code of the City of Hughson.
N. Adoption of the Uniform Code for the Abatement of Dangerous Buildings 1997 Edition.
For the purpose of prescribing regulations governing the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area and maintenance of all buildings and structures within the City, the Uniform Code for Abatement of Dangerous Buildings, 1997 Edition, published by the International Conference of Building Officials, and subsequent additions and editions thereto, one copy of which is on file in the office of the City Clerk for public record and inspection, is hereby adopted by reference and made a part of this chapter as though set forth in this chapter in full, subject, however, to the amendments, additions and deletions set forth in this chapter, and said Code shall be known as the Dangerous Buildings Code for the City of Hughson.
Article IV. Permits
15.04.035 Permits required.
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.036 Annual permit.
In lieu of an individual permit for each alternation to an already approved electrical, gas, mechanical or plumbing installation, the building official is authorized to issue an annual permit upon application therefor to any person, firm or corporation regularly employing one or more qualified tradespersons in the building, structure or on the premises owned or operated by the applicant for the permit.
The person to whom an annual permit is issued shall keep a detailed record of alterations made under such annual permit. The building official shall have access to such records at all times or such records shall be filed with the building official as designated. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.037 Work exempt from permit.
Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following:
A. Building.
1. One-story detached accessory buildings used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet (11.15 m2).
2. Fences not over six seven feet (1,829 mm) high.
1679890-1
3. Oil derricks.
4. Retaining walls that are not over four feet (1,219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or III-A liquids.
5. Water tanks are supported directly upon grade if the capacity does not exceed 5,000 gallons (18,927 L) and the ratio of height to diameter or width does not exceed 2:1.
6. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade and not over any basement or story below and are not part of an accessible route.
7. Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work.
8. Temporary motion picture, television and theater stage sets and scenery.
9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches deep, do not exceed 5,000 gallons (18,927 L) and are installed entirely above ground.
10. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.
11. Swings or other playground equipment accessory to detached one- and two-family dwellings.
12. Window awnings supported by an exterior wall that do not project more than 54 inches (1,372 mm) from the exterior wall and do not require additional support of Group R-3 and U occupancies.
13. Non-fixed and moveable fixtures, cases, racks, counters and partitions not over five feet nine inches (1,753 mm) in height.
B. Electrical.
1. Repairs and Maintenance. Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.
2. Radio and Television Transmitting Stations. The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for a power supply and the installation of towers and antennas.
3. Temporary Testing Systems. A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.
C. Gas.
1679890-1
1. Portable heating appliance.
2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.
D. Mechanical.
1. Portable heating appliance.
2. Portable ventilation equipment.
3. Portable cooling equipment.
4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by this code.
5. Replacement of any part that does not alter its approval or make it unsafe.
6. Portable evaporative cooler.
7. Self-contained refrigeration system containing 10 pounds (five kg) or less of refrigerant and actuated by motors of one horsepower (746 W) or less.
E. Plumbing.
1. The stopping of leaks in drains, water, soil, waste or vent pipe; provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with the new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code.
2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.036)
15.04.038 Emergency repairs.
Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next working day to the building official. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.037)
15.04.039 Repairs.
Application or notice to the building official is not required for ordinary repairs to structures, replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a 1679890-1
structure affecting the egress requirements; nor shall ordinary repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.038)
15.04.040 Public service agencies.
A permit shall not be required for the installation, alteration or repair of generation, transmission, distribution or metering or other related equipment that is under the ownership and control of public service agencies by established right. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.039)
15.04.041 Application for permit.
To obtain a permit, the applicant shall first file an application in writing on a form furnished by the department of building safety for that purpose. Every such application shall:
A. Identify and describe the work to be covered by the permit for which application is made.
B. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
C. Indicate the use or occupancy for which the proposed work is intended.
D. Be accompanied by plans, diagrams, computations and specifications and other data as required in this chapter.
E. State the valuation of the proposed work.
F. Be signed by the applicant, or the applicant’s authorized agent.
G. Give such other data and information as may be required by the building official. (Ord. 13- 04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.040)
15.04.042 Action on application.
The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the required pertinent laws, the building official shall reject such application in writing, stating the reason(s) for rejection. If the building official is satisfied that the proposed work conforms to the requirements of this code and laws and ordinances applicable thereto, the building official shall issue a permit as soon as practicable. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.041)
15.04.043 Time limitation and expiration.
A. Permit Application. An application for which no permit is issued within 180 days 12 months following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The building official is authorized to extend the time for action by the applicant for a period not to exceed 180 days upon request by the applicant. A second extension not exceeding 180 days may be granted by the building official under the following conditions:
1. The applicant submits a written request for such extension showing justifiable cause; 1679890-1
2. There have been no changes to any of the governing codes under which the plans were originally submitted since the original date of application;
3. An administrative fee as established must be paid at the time the second extension is granted.
No further application extensions will be granted after a second extension.
B. Permit. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site for such permit is suspended or abandoned for a period of 180 days after the time the work is commenced.
The building official may re-activate a permit which has become invalid (either expired or inactive), upon written request by the permit holder, under the following conditions:
1. The suspension or abandonment of work has not exceeded one year;
2. There have been no changes to any of the governing codes under which the permit was originally issued during the time since the permit became invalid;
3. An administrative fee as established must be paid at the time an extension is granted.
The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Any permit holder with an unexpired permit may submit a written request for an extension of the time within which work may commence under that permit. The building official may extend the time for action by for a period not exceeding 180 days if the request demonstrates circumstances are beyond the control of the permit holder. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly 15.04.042)
15.04.044 Validity.
The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provisions of this code or of any other ordinance of the jurisdiction. Permits presuming to give the authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of this code or of any other ordinance of this jurisdiction. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007.
Formerly 15.04.043)
15.04.045 Suspension or revocation.
The building official is authorized to suspend or revoke a permit issued under the provisions of this code whenever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of 1679890-1
this code. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly
15.04.044)
15.04.046 Placement of permit.
The building permit or copy shall be kept on the site of the work until the completion of the project. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007. Formerly
15.04.045)
Article V. Construction Documents
15.04.050 Submittal documents.
Construction documents, statement of special inspections and other data shall be submitted in one or more sets with each permit application. The construction documents shall be prepared by a registered design professional. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional.
Exception: The building official may waive the submission of plans, calculations, construction inspection requirements and other data if it is found that the nature of the work applied for is such that reviewing of plans is not necessary to obtain compliance with this code. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.051 Information on construction documents.
Construction documents shall be dimensioned and drawn upon suitable material. Electronic media documents are permitted to be submitted when approved by the building official.
Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official.
The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of this code. In other than occupancies in Group R-2, R-3, and 1-1, the construction documents shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces.
Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this code. The construction documents shall provide details of the wall envelope as required, including flashing, intersections with dissimilar materials, corners, end detail, control joints, intersections at roofs, eaves or parapets, means of drainage, water-resistive membrane and details around openings.
The construction documents shall include manufacturer’s installation instructions and provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system which was tested, where applicable, as well as the test procedure used. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
1679890-1
15.04.052 Site plan.
The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The building official is authorized to waive or modify the requirements for a site plan when the application for a permit is for alteration or repair or when otherwise unwarranted. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07- 08 § 1, 2007)
15.04.053 Phased approval.
The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted; provided, that adequate information and detailed statements have been filed complying with pertinent requirements of this code; and provided, that all fees as specified in the resolution adopted pursuant to HMC 15.04.065 are paid in full. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder’s own risk with the building operation and without assurance that a permit for the entire structure will be granted. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.054 Design professional in responsible charge.
When it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner may designate a registered design professional in responsible charge who shall perform all of the duties required of the registered design professional in responsible charge. The building official shall be notified in writing by the owner if the registered design professional in responsible charge is changed or is unable to continue to perform the duties.
The registered design professional in responsible charge shall be responsible for reviewing and coordinating all submittal documents prepared by others, including deferred submittal items, for compatibility with the design of the building.
When structural observation is required by CBC Chapter 17, the statement of special inspections shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.055 Deferred submittals.
For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period.
1679890-1
Deferral of any submittal items shall have prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official.
Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and that they have been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until their design and submittal documents have been approved by the building official. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.056 Amended construction documents.
Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.057 Retention of construction documents.
One set of approved construction documents shall be retained by the building official for a period of not less than 180 days from the date of completion of the permitted work, or as required by state or local laws. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
Article VI. Temporary Structures and Uses
15.04.060 General.
The building official is authorized to issue a permit for temporary structures and temporary uses.
Such permit shall be limited as to time of service but shall not be permitted for more than 180 days. The building official is authorized to grant extensions for demonstrated causes.
Temporary structures and uses shall conform to the structural strength, fire safety, means of egress, accessibility, light, ventilation and sanitary requirements of this code as necessary to ensure public health, safety and general welfare.
The building official is authorized to give permission to temporarily supply and use power in part of an electrical installation before such installation has been fully completed and the final certificate of completion has been issued. The part covered by the temporary certificate shall comply with the requirements specified for temporary lighting, heat or power in the California Electrical Code.
The building official is authorized to terminate such permit for temporary structure or use and to order the temporary structure or use to be discontinued. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
1679890-1
Article VII. Fees
15.04.065 Fees established by city council resolution.
All fees required pursuant to Title 24 shall be paid in the amount established set forth in the schedule of fees established by resolution of the city council. (Ord. 13-04(B) § 1, 2014; Ord. 11- 03 § 1, 2011; Ord. 07-08 § 1, 2007)
Article VIII. Inspections
15.04.070 General.
Construction or work for which a permit is required shall be subject to inspection by the building official and all such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction.
Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.071 Preliminary inspection.
Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed. A survey of the lot may be required by the building official to verify that the structure is located in accordance with the approved plans. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.072 Required inspections.
The building official, upon notification, shall make the inspections set forth in the following subsections:
A. Foundation and Footing Inspection. Footings and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job.
B. Concrete Slab and Under-Floor Inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor.
C. Lowest Floor Elevation. In floor hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in CBC Section 1612.5 shall be submitted to the building official. 1679890-1
D. Frame Inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved.
E. Lath or Gypsum Board Inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, are in place, but before any plastering is applied or before gypsum board joints and fasteners are taped and finished.
Exception: Gypsum board that is not part of a fire-resistance-rated assembly or shear assembly.
F. Fire-Resistant Penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed from view until inspected and approved.
G. Energy Efficiency Inspections. Inspections shall be made to determine compliance with the California Energy Code and shall include, but not be limited to, inspections for: envelope insulation R and U values, fenestration U value, duct system R value, and HVAC and waterheating equipment efficiency.
H. CalGreen Tier 1 Inspections. Inspections shall be made to determine compliance with the California Green Building Standards Code and shall include both mandatory measures, as well as the Tier 1 measures of Appendix A4.
I. Other Inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety.
J. Special Inspections. For special inspections, see CBC Chapter 17.
K. Final Inspection. The final inspection shall be made after all work required by the building permit is completed and all other specific requirements of the project are approved. (Ord. 13- 04(B) § 1, 2014; Ord. 11-03 § 1 , 2011; Ord. 07-08 § 1, 2007)
15.04.073 Inspection agencies.
The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007)
15.04.074 Inspection requests.
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. The building official may require that every request for inspection be filed at least one working day before such inspection is desired.
Such request may be in writing or by telephone at the option of the building official. It shall be the duty of the permit holder to provide access to and means for inspection of such work that are required by this code. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007) 1679890-1
15.04.075 Approval required.
Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate that portion of the construction is satisfactory as completed, or shall notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official. (Ord. 13- 04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007) Article IX. Certificate of Occupancy
15.04.080 General.
A. Use and Occupancy. No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made, until the building official has issued a certificate of occupancy therefor as provided herein. U occupancies shall be exempt from the requirements of this section.
B. Certificate Issued. After the building official inspects the building or structure and finds no violations of the provisions of this code or other laws that are enforced by the department of building safety, the building official shall issue a certificate of occupancy that shall contain the following:
1. The building permit number.
2. The address of the building.
3. The name and address of the owner.
4. A description of that portion of the building for which the certificate is issued.
5. A statement that the described portion of the building has been inspected for compliance with the requirements of this code for the group and division of occupancy and the use for which the proposed occupancy is classified.
6. The name of the building official.
7. The edition of the code under which the permit was issued.
8. Any special stipulations and conditions of the building permit.
C. Temporary Certificate. The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit; provided, that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
D. Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this code whenever the certificate is issued in error, or on the basis of incorrect information supplied, or when it is determined that the 1679890-1
building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of this code. (Ord. 13-04(B) § 1, 2014; Ord. 11-03 § 1, 2011; Ord. 07-08 § 1, 2007) Meeting Date: January 23, 2023
Subject: Adopt Resolution No. 2023-09, Affirming the City of Hughson’s Commitment to Support the Riverview Mobile
Home Estates Water Consolidation Project and
Authorization for the City Manager to Execute the Letter of Support
Enclosures: Draft Letter of Support- Attachment A
Feasibility Study – Attachment B
Affordability Study – Attachment C
Presented By: Thania Bejarano, Self-Help Enterprises
Approved By: ___________________________
City Manager
Staff Recommendations:
1. Adopt Resolution No. 2023-09, affirming the City of Hughson’s commitment to supporting the Riverview Mobile Home Estates Water Consolidation Project.
2. Authorize the City Manager to execute the Letter of Support.
Background:
Riverview Mobile Home Estates (RMHE) is a small community water system, located in Stanislaus County, CA, Water System No. 5000090. RMHE currently provides water services to 173 connections and a population of 540 residents. The annual median household income for the system is $35,000, categorizing it as a Severely Disadvantaged Community (SDCAC).
In May 2016, the RMHE received a compliance order from the Stanislaus County Department of Environmental Resources (No. DER-16CO-006) for violation of the uranium MCL (Maximum Contaminant Level) of 10 mg/L. While RMHE financed several projects to address the water contamination problem, none of these efforts resulted in permanent results or prospects for sources that meet drinking water standards.
The State Water Resources Control Board, Division of Drinking Water (DDW) assigned Self-Help Enterprises (SHE) to RMHE on August 31st, 2020, to provide CITY COUNCIL AGENDA ITEM NO. 6.2
SECTION 6: NEW BUSINESS
technical assistance and aid with their water contamination issues. From August 2020 to January 2023, Self-Help Enterprises and Black Water Consulting Engineers, Inc. (Black Water) have been working with RMHE to identify and implement a longterm solution that will address their uranium contamination issues.
Discussion:
A Feasibility Study (Attachment B) was prepared by Black Water in April 2021.
According to the Feasibility Study, Alternative 4 - Consolidation, was the consultant's selected project alternative. Three consolidation options were explored and considered: Stanislaus Regional Water Authority (SWRA), City of Modesto, and the City of Hughson. Other alternatives that were considered in the Feasibility Study included the following:
Table 1: Explored Alternatives and Findings
Explored Alternatives Findings
Construction of a new well
The RMHE owners previously evaluated this
option with Quality Service in the past.
Kleinfelder drilled a test hole on June 4, 2018,
to evaluate the water quality at a potential new
well location. The laboratory testing results for
the test hole returned high levels of gross
alpha and uranium that exceeded the DDW’s
maximum contaminants (MCLs). The
determination was made at the time that the
development of a new well was not a feasible
solution to addressing the water system’s
problem.
On-site water treatment plant
The feasibility of constructing a groundwater
treatment facility at RMHE was evaluated by
Kleinfelder, Inc. in September 2019. The major
components of the design included
discontinuing the use of the south well in favor
of beginning the use of the north well,
installation of a new storage tank and booster
pump system, filtration system, electrical
improvements, and equipment startup and
testing. Quality Service’s cost estimate for the
entire project totaled $886,293 making it an
unaffordable option.
Consolidation
1) City of Hughson
2) City of Modesto
3) Stanislaus Regional Water Authority
(SRWA)
The DDW instructed SHE and Black Water to conduct water consolidation outreach to all the nearby entities and develop an Affordability Study. The consolidation outreach findings are listed below in Table 2: Consolidation Outreach & Findings, and an Affordability Study Draft (Attachment C) was prepared by Black Water in September 2022. The purpose of the Affordability Study is to determine appropriate and affordable water rates for Riverview Mobile Home Park customers while ensuring the City of Hughson operation and maintenance staff, city staff, and existing customers are not unfairly burdened as a result of the water consolidation.
City of Hughson Water Engineer, Cort Abney, prepared a Cost/Revenue Evaluation to identify budgetary expenses, rates, and revenues associated with the proposed consolidation project, in which the City of Hughson provides a potable water supply to the Riverview Mobile Home Estates. Black Water will be working in conjunction with the City of Hughson and Cort Abney to complete the Final Affordability Study.
Table 2: Consolidation Outreach & Findings
Consolidation
Outreach
Findings
City of Hughson Feasible – If water capacity is increased (1.94 miles from RMHE)
City of Modesto Not feasible – insufficient water capacity and distance (3.80 miles from RMHE
Stanislaus Regional
Water Authority (SRWA)
Not feasible – outside the Turlock Irrigation District
service area (1.26 miles from RMHE
City of Waterford Not feasible – insufficient water capacity and distance (3.70 miles from RMHE)
The consolidation outreach efforts conducted by Self-Help Enterprises and the Regional Board identified the City of Hughson as the system’s only water consolidation option, with the stipulation that additional water supplies would need to be constructed as part of the project to address the City’s water capacity issues.
Based on the Affordability Study Draft, the total cost of the construction project would approximately be $12,137,072 and the maximum State Grant awarded amount would be $14,080,000. Included in the total cost, and based on information provided by Cort Abney, the City’s contracted water engineer, the estimated cost for expanding the City of Hughson facilities is $7,500,000. The $7,500,000 includes the first phase of the North Facility Project, which includes the addition of a new storage tank and booster pumps that would provide an additional 500 units of water.
Water Consolidation Project Benefits – City of Hughson
1. Based on the current Intended Use Plan (IUP), the RMHE Project is eligible for up to 100% Planning Grants/Principal Forgiveness ($60,000 per connection or up to $80,000 for good cause) funding due to the following reasons:
a. The RMHE Community is an SDAC: $35,000< 60% of State MHI – Category A-C project
b. The project qualifies as a high-priority project that addresses public health issues:
Compliance Order from Stanislaus County Department of Environmental Resources violation of Uranium (No. DER-16CO-006).
2. Consolidation projects are eligible for grant funding, regardless of the project category. The Division of Financial Assistance may approve up to $80,000 per connection and 100% for good cause of the construction project. At 173 service connections, RMHE would be eligible for up to $13 million. The 13 million grant can cover the extension of the water service from the Hughson water system to connect to RMHE, the necessary City of Hughson Water System Improvements, and the disconnection and destruction of the existing groundwater wells.
It is important to note that the State Water Resources Control Board – Division of Financial Assistance (DFA) will make their final determination of the recipient’s project grant/loan and outline all conditions in the awarded funding agreement which cannot be definitively determined until the drinking water construction application is submitted and reviewed.
Table 8: Estimated Project Cost Breakdown in the Affordability Study Draft Item Amount
Consolidation Improvements
$ 4,637,072
Hughson Water System Improvement
$ 7,500,000
Total
$12,137,072
Maximum Grant Amount – DFA
$14,320,000
3. The City of Hughson might be eligible for the Consolidation Incentive Funding:
a. If a Public Water System (PWS) acts as an administrator to one or more SCWSs. Up to $5 million in 0% financing for an Incentive Project; or Grant funding of up to $2,500/connection when acting as an administrator for a small DAC water system or up to $5,000/connection for a small SDAC water system for an Incentive Project. Max of $1 million grant is available per water system.
b. If the City of Hughson is a voluntary participant in consolidation, the receiving water system is eligible to receive incentive funding. Phase 1 of the project may qualify for a consolidation incentive project for up to $10 million in 0% financing. IUP home page:
https://waterboards.ca.gov/water_issues/programs/grants_loans/srf/docs /dw-grant-fact-sheet.pdf. This Program can help begin the first phase of the City’s North Facility Project to increase water capacity. The North Facility Project would increase the City’s water capacity by approximately 500 equivalent residential units and Riverview currently has 173 connections which would allow for future expansion on the City’s part.
4. While Riverview Mobile Homes Estates does not have plans to expand in the next few years. Should the Mobile Home Park Owner want to expand, they would need to get approval from the City to expand their water use or demand.
5. Throughout the planning and construction phase of the Water Consolidation Project the City of Hughson’s contracted water engineer would be a 2nd consultant on the project in addition to Black Water to review plans on behalf of the City.
6. To support consolidation, DFA, in coordination with DDW, will continue to emphasize consolidation opportunities by providing project financing and technical assistance. Consolidation Incentives can provide grant funding for infrastructure improvements to mitigate drinking water risks.
Fiscal Impact:
Hughson staff would continue to work with the State Water Resources Control Board as needed to ensure that the best interests of the City are considered. The City contracted water engineer will be paid for by State project funding through Self-Help Enterprises.
CITY COUNCIL
CITY OF HUGHSON
RESOLUTION NO. 2023-09
RESOLUTION OF THE CITY OF HUGHSON CITY COUNCIL
AFFIRMING THE CITY OF HUGHSON’S COMMITMENT TO SUPPORTING THE
RIVERVIEW MOBILE HOME ESTATES WATER CONSOLIDATION PROJECT AND
AUTHORIZATION FOR THE CITY MANAGER TO
EXECUTE THE LETTER OF SUPPORT
WHEREAS, Riverview Mobile Home Estates (RMHE) is a small community water system, located in Stanislaus County that currently provides water services to 173 connections and a population of approximately 540 residents; and WHEREAS, RMHE has been categorized as a Severely Disadvantaged Community and has received a compliance order from the Stanislaus County Department of Environmental Resources for violation of the uranium maximum contaminate level; and WHEREAS, the State Water Resources Control Board (SWRCB), Self-Help Enterprises, and Black Water Consulting Engineers, Inc., have been working with RMHE to identify and implement a long-term solution that will address the uranium contamination issues; and
WHEREAS, through a Feasibility Study and a Draft Affordability Study, findings have been made that the City of Hughson is the only feasible water system for consolidation; and
WHEREAS, the City of Hughson has insufficient water supply to service RMHE and through a voluntary consolidation project, the City of Hughson may be eligible for incentive funds from the SWRCB – Division of Financial Assistance, to construct the first phase of a north facility project, consisting of the addition of a new storage tank and booster pumps that would provide an additional 500 units of water; and WHEREAS, the City of Hughson will be offered the opportunity to review any water consolidation deliverables and documents prior to agreeing to provide City water to RMHE.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hughson affirms the City of Hughson’s commitment supporting the Riverview Mobile Home Estates Water Consolidation Project and authorizes the City Manager to execute the letter of support.
PASSED AND ADOPTED by the City Council of the City of Hughson at its regularly scheduled meeting on this 23rd day of January 2023 by the following roll call vote:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
APPROVED:
GEORGE CARR, Mayor
ATTEST:
__________________________
ASHTON GOSE, City Clerk
(Please insert the City of Hughson Letterhead) Attachment A (Please insert the date)
State Water Resources Control Board
Division of Financial Assistance
Safe and Affordable Drinking Water Funds (SADW)
Project No. 6202 – Riverview Mobile Home Estates Planning Project – Water Consolidation with the City of Hughson
The City of Hughson has been working closely with Riverview Mobile Home Estates (RMHE), Self-Help Enterprises, and Black Water Consulting Engineers to evaluate the consolidation of the RMHE Water System with the City of Hughson. The purpose of this letter is to emphasize the City of Hughson’s commitment to supporting the water consolidation project with the stipulation that a Rate Study, Memorandum of Understanding and Plans and Specifications are developed before the City enters into a binding agreement. The City of Hughson would like the opportunity to review any water consolidation deliverables/documents prior to agreeing to provide City water to RMHE. While the City of Hughson has facilitated other consolidations with small community water systems in Stanislaus County, such as Cobles Corner and Country Villa Apartments, more information is needed to advocate for the regional water system consolidation with RMHE.
The City of Hughson supports Self-Help Enterprises and Riverview Mobile Home Estates in continuing to develop the planning deliverables necessary to reach the construction phase. The City of Hughson agrees to participate in future monthly project meetings as City staff has the availability and to work directly with SHE, Black Water and RMHE on the water consolidation project when necessary.
Respectfully,
(Name)
(City Manager)
(Signature)
Attachment B
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
i
TABLE OF CONTENTS
1 Introduction..........................................................................................................................................1
1.1 Background ...................................................................................................................................1
1.2 Scope.............................................................................................................................................1
1.3 Objectives......................................................................................................................................1
1.4 Previous Documents, Data, and Reference Documents...............................................................3
1.5 Regulatory and Funding Requirements........................................................................................3 2 Water System Description....................................................................................................................4
2.1 Water System Facilities.................................................................................................................4
2.2 Water Usage and Demands ..........................................................................................................7
2.3 Water System Operation and Maintenance History.....................................................................8 3 Problem Description .............................................................................................................................9
3.1 Water Quality................................................................................................................................9
3.2 Operation and Maintenance.......................................................................................................11 4 Consolidation Analysis........................................................................................................................12 5 Alternative Analysis ............................................................................................................................14
5.1 Alternative 1 – No Project...........................................................................................................14
5.2 Alternative 2 – On-site Water Treatment Facility.......................................................................14
5.3 Alternative 3 – Construction of a New Well ...............................................................................15
5.4 Consolidation Alternatives..........................................................................................................15 Option 1 – City of Hughson.................................................................................................16 Option 2 –City of Modesto..................................................................................................16 Option 3 – Stanislaus Regional Water Authority ................................................................17
5.5 Alternative Evaluation.................................................................................................................17 30-year Life Cycle Cost........................................................................................................18 Environmental Sustainability ..............................................................................................18 Operations and Maintenance .............................................................................................19 Community Impacts and Benefits.......................................................................................19 Summary .............................................................................................................................20 6 Selected Project..................................................................................................................................21
6.1 Major Project Components.........................................................................................................21 7 Cost Estimate ......................................................................................................................................22 8 Proposed Schedule .............................................................................................................................23 Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
ii
LIST OF TABLES
Table 1 – Monthly Water Usage (2012-2019)...............................................................................................7 Table 2 – Summary of Average Day Demand, Maximum Day Demand, and Peak Hour Demand ...............7 Table 3 – Maintenance and Monitoring Schedule........................................................................................8 Table 4 – Quarterly Uranium Monitoring Results (in pCi/L).........................................................................9 Table 5 – Water Quality Data for South Wella ............................................................................................10 Table 6 – Water Quality Data for South West Wella ...................................................................................10 Table 7 – Evaluation Criteria.......................................................................................................................18 Table 8 – Estimated Life Cycle Cost Scoring................................................................................................18 Table 9 – Environmental Sustainability Scoring..........................................................................................18 Table 10 – Operation and Maintenance Scoring ........................................................................................19 Table 11 – Community Impacts and Benefits Scoring ................................................................................19 Table 12 – Raw Scores and Weighted Scores for Options..........................................................................20 Table 13 – Project Components Estimated Useful Life...............................................................................21 Table 14 – Estimated Project Cost..............................................................................................................22 Table 15 – Project Schedule........................................................................................................................23
LIST OF FIGURES
Figure 1: Project Location .............................................................................................................................2 Figure 2: Existing Water Distribution System ...............................................................................................5 Figure 3: Well Site Process Schematic ..........................................................................................................6 Figure 4: Conceptual Consolidation Options..............................................................................................13
APPENDICES
Appendix A – Water System Permit
Appendix B – Water System Documents
Appendix C – Compliance Order
Appendix D – Summary of Source Water Quality
Appendix E – Groundwater Treatment Facility Proposals
Appendix F – Detailed Cost Estimates
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
1 1 Introduction
This Feasibility Study Report (Report) was prepared for the Riverview Mobile Home Estates, LLC (RMHE Owners) to evaluate the Riverview Mobile Home Estates existing water system. This Report identifies water system deficiencies and evaluates alternative improvements in order to meet state and federal requirements to provide the Riverview Mobile Home Estates (RMHE) community with safe and reliable drinking water that complies with the Safe Drinking Water Act (SWA).
The Report was funded as part of the California State Water Resources Control Board (SWRCB) and SelfHelp Enterprises (SHE) Proposition 1 Technical Assistance (TA) Work Plan through the Community Development and Technical Assistance Program Agreement No. D-16-12802, TA Work Plan No. 6202-A.
Background information regarding the RMHE Water System, scope of the Report, and objectives for this Report are discussed in this section.
1.1 Background
The RMHE Water System (Water System) is a community water system privately owned and operated by the RMHE Owners, located approximately 1 mile south of State Route 132 in Modesto, California. Refer to Figure 1 for project location. The Water System provides potable water to approximately 250 residents and consists of 176 service connections that supply 174 mobile home spaces and one manager’s office (two connections).
RMHE was issued a Domestic Water Supply Permit (Permit) for Public Water System No. 5000090 by Stanislaus County Department of Environmental Resources (County DER) on March 17, 2016 under permit number 2016-03-005. A copy of the Permit is provided in Appendix A.
1.2 Scope
The following tasks were completed as part of this Report:
1. A review of historical reports, documents, and data related to the Water System.
2. A review of existing regulatory requirements for the Water System.
1.3 Objectives
The objectives for the Report are as follows:
1. Identification of existing source and system deficiencies.
2. Evaluation of existing water system.
3. Alternative analysis for improvements to address identified deficiencies.
4. Recommendation of proposed improvement(s).
602 LYELL DRIVE, MODESTO, CA 95356 PH. 209.322.1820
I:\J20291 RIVERVIEW MOBILE ESTATES\CAD\TASK-02 RIVERVIEW WATER SYSTEM\REPORTS\ENGINEERING REPORT\FIGURES\FIGURE 1-PROJECT LOCATION.DWG PLOT: 2/9/2021 9:13:24 AM BY GUSTAVO MANCILLA
RIVERVIEW
MOBILE HOME ESTATES
WATER SYSTEM
LOCATION MAP
FIGURE 1
PROJECT
LOCATION
STANISLAUS COUNTY
SCALE: NTS
HWY 132 / YOSEMITE BLVD GEER RD GEER RD
E HATCH RD
SANTA FE AVE
PROJECT LOCATION
RIVERVIEW
MOBILE HOME ESTATES
WATER SYSTEM
JANTZEN RD ALBERS RD WEYER RD
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
3 1.4 Previous Documents, Data, and Reference Documents Previous documents and data reviewed and/or referenced in the Report include the following:
[1] California Regulations to Drinking Water, SWRCB.
[2] Riverview Estates Water System Record Drawings, prepared by Lawrence D. McDermott, Summer 2014.
[3] State of California Domestic Water Supply Permit for Public Water System No. 5000090, issued by Stanislaus County Department of Environmental Resources, March 17, 2016. [4] Stanislaus County Compliance Order No. DER-16CO-006, issued by the Stanislaus County Department of Environmental Resources Division of Environmental Health, May 9, 2016. [5] Operation Plan for Potable Water System Chlorination, Quality Service, Inc., March 2015. [6] Proposal for Modular Radium, Uranium, and (future) Nitrate Water Treatment System, Quality Service, Inc., August 2019.
[7] Proposal for Groundwater Treatment Facility, Kleinfelder, Inc., September 2019. [8] Technical Memorandum for Test Well Drilling and Logging, Kleinfelder, Inc., August 2018. [9] Riverview Mobile Estates: Summary of Source Water Quality, Quality Service, Inc., February 2017 thru August 2018.
[10] Meter Readings and Well Soundings Data, 2018 and 2019. [11] Summary of Historic Flow Records, January 2012 thru December 2019. [12] Various Well Completion Reports, prepared by Calwater Drilling Co., Osterberg & Stewart, and Hennings Bros. Drilling Co., 1967, 1973, 1982, and 2003. [13] Groundwater Quality Analysis Reports, prepared by FarWest Laboratories, Inc., October and November 2016.
1.5 Regulatory and Funding Requirements
Per the Water System Permit, the Water System is classified as a community water system (with less than 1,000 service connections). Per the 2017 California Waterworks Standards in the California Code of Regulations, Title 22, Division 4, Chapter 16 (California Waterworks Standards), the following summarizes some of the permit requirements applicable for the RMHE Water System:
• The system's water source(s) shall have the capacity to meet the system's maximum day demand (MDD).
• The system shall have storage capacity equal to or greater than MDD, unless the system can demonstrate that it has an additional source of supply or has an emergency source connection that can meet the MDD requirement.
• The system shall be capable of meeting MDD with the highest-capacity source off-line.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
4 2 Water System Description
This section provides a description of the Water System’s sources and facilities. Figure 2 provides a schematic map of the Water System’s service area and Figure 3 provides a schematic map of the well site flow process.
2.1 Water System Facilities
The RMHE Water System consists of two (2) active wells that supply the potable water system. The first well is referred to in the Permit as the South Well, PS Code 5000090-002 (South Well) and the second well is referred to as the South West New Well, PS Code 5000090-013 (South West Well). The wells operate in an alternating lead/lag pumping style that helps balance the burden on a single well.
The South Well was constructed in 1978. The South Well is 220-feet deep with a 50-foot annular seal and a 10-inch diameter steel casing. The South Well is equipped with a 240-gallon per minute (gpm), 20- horsepower (HP) submersible pump. The South West Well was constructed on May 20, 2004. The South West Well is 140-feet deep with a 95-foot bentonite annular seal and a 10-inch diameter PVC casing. The South West Well is equipped with a 300-gpm, 20-HP submersible pump. Each well has a 4-inch galvanized steel discharge pipe, source water sample tap, check valve, totalizing flow meter, and an emergency backup generator system.
Only the South West Well discharges to a 10,000-gallon hydro-pneumatic pressure tank. The South West Well also has a bypass pipe that allows water to be pumped directly to the distribution system. The water from both active wells remains untreated before entering the distribution system. The pressure tank is equipped with a 4-inch diameter drain to waste valve at the bottom of the tank that allows periodic flushing to remove accumulated sediment. The pressure tank is configured with a pressure switch that controls the deep well pump operation based on system demand. An air release valve and air compressor balance the air to water ratio within the pressure tank. The South Well connects directly to the 6-inch diameter distribution system after passing through a 6-inch diameter isolation valve. The discharge pipe from the pressure tank connects to the 6-inch diameter distribution system just downstream of the isolation valve on the pipe leading from the South Well. The South West Well bypass pipe connects to the 6-inch distribution system just upstream of the South Well isolation valve. Both the pressure tank discharge pipeline and the South West Well bypass pipeline have 6-inch isolation valves to allow operators manual control of water leading to the distribution system.
The water distribution system consists of approximately 5,750 feet of 1-½-inch diameter to 6-inch diameter pipelines and 176 ¾-inch service laterals of varying length. The Water System also supplies ten (10) fire hydrants located throughout the RMHE.
The Water System has two additional wells referred to as the North East Well and the North Well. The North East Well was abandoned in August 2003. The North Well was constructed adjacent to the North East Well as a replacement source and has remained inactive since the well was developed in October 2000.
602 LYELL DRIVE, MODESTO, CA 95356 PH. 209.322.1820
I:\J20291 RIVERVIEW MOBILE ESTATES\CAD\TASK-02 RIVERVIEW WATER SYSTEM\REPORTS\ENGINEERING REPORT\FIGURES\FIGURE 2-EXISTING WATER DISTRIBUTION.DWG PLOT: 2/12/2021 2:17:37 PM BY GUSTAVO MANCILLA
EXISTING WATER DISTRIBUTION
SYSTEM SCHEMATIC
FIGURE 2
JANTZEN RD 0 150' 300'
SCALE: 1"=150'
JANTZEN RD
GEER RD
WATER MAIN
LEGEND
WATER SERVICE
FIRE HYDRANT
ACTIVE WELL SITE
INACTIVE WELL SITE
602 LYELL DRIVE, MODESTO, CA 95356 PH. 209.322.1820
I:\J20291 RIVERVIEW MOBILE ESTATES\CAD\TASK-02 RIVERVIEW WATER SYSTEM\REPORTS\ENGINEERING REPORT\FIGURES\FIGURE 3-PROCESS SCHEMATIC.DWG PLOT: 2/9/2021 9:18:38 AM BY GUSTAVO MANCILLA
WELL SITE PROCESS SCHEMATIC
FIGURE 3
CHECK VALVE
LEGEND
FLOW METER
PRESSURE PIPE
MANUAL GATE OR
BUTTERFLY VALVE
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
7 2.2 Water Usage and Demands
The RMHE Water System records water usage data from the flow meters located between each active well and the pressure storage tank. In the past, data was recorded on a weekly basis and is currently recorded on a monthly basis. Table 1 summarizes the Water System’s monthly water supply data recorded from January 2012 to December 2019.
Table 1 – Monthly Water Usage (2012-2019)
Water Usage Data (MG)
Month 2012 2013 2014 2015 2016 2017 2018 2019
Jan 0.43 0.54 0.46 0.47 0.52 0.31 0.91 1.13
Feb 0.43 0.45 0.39 0.41 0.43 0.62 0.72 0.58
Mar 0.45 0.48 0.51 0.47 0.50 0.23 0.77 0.77
Apr 0.64 0.67 0.58 0.52 0.52 0.82 1.01 0.83
May 0.72 0.72 0.69 0.58 0.46 0.85 0.65 1.09
Jun 0.82 0.87 0.79 0.74 1.02 1.06 2.02 1.35
Jul 0.80 1.03 0.84 0.77 1.00 0.38 1.09 1.36
Aug 0.85 0.95 0.73 0.58 1.07 ND 0.90 0.90
Sep 0.70 0.90 0.70 0.55 0.98 ND 1.36 1.65
Oct 0.61 0.76 0.69 0.57 0.78 ND 1.53 1.27
Nov 0.42 0.69 0.55 0.51 1.05 ND 0.95 0.69
Dec 0.90 0.48 0.44 0.48 0.75 ND 0.99 0.95
Total 7.77 8.54 7.37 6.65 9.08 4.27 12.90 12.57
ND = No Data
The South Well and the South West Well operate in an alternating lead/lag style. The data summarized in Table 1 above represents the total combined flow readings from both active wells. The highest monthly water usage based on the data is 2.02 million gallons (MG) in June 2018. This value was used to estimate the system demands.
The average day demand (ADD) was estimated using the highest monthly water usage. The maximum day demand (MDD) was estimated by multiplying the ADD with a peaking factor of 1.5. The peak hour demand (PHD) was estimated by multiplying the MDD with a peaking factor of 1.5. Table 2 summarizes the estimated ADD, MDD, and PHD based on the California Waterworks Standards.
Table 2 – Summary of Average Day Demand, Maximum Day Demand, and Peak Hour Demand Average Day Demanda Maximum Day Demandb Peak Hour Demandc gpm gpd gpm gpd gpm gph
46.7 67,296 70.1 100,944 105.2 6,309 aHighest monthly water usage (June 2018) divided by 30 days. b
ADD x 1.5.
c
MDD x 1.5.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
8 The South Well capacity of 240 gpm and the South West Well capacity of 300 gpm are both sufficient to meet the demands of the Water System. There is no other impact on the peak flow demand on the Water System because it does not provide water for irrigation purposes.
2.3 Water System Operation and Maintenance History
RMHE contracts with Quality Service, Inc. for operation and maintenance (O&M) of the Water System.
Table 3 lists the maintenance and monitoring duties performed by a Quality Service Certified Drinking Water Operator.
Table 3 – Maintenance and Monitoring Schedule
Component Check and Frequency
South Well Monthly: Coliform bacteria sample with a chlorine residual. Monitor static totalizer meter readings and draw down water levels.
South West Well
Daily: visual, hazards (electrical, chemical, etc.), correct operation (onsite).
Monthly: Coliform bacteria sample with a chlorine residual. Monitor static totalizer meter readings and draw down water levels.
Distribution System
Monthly: One coliform bacteria sample per sample site plan with a chlorine residual.
Quarterly: Flushing of unoccupied spaces.
Annually: Testing all backflows installed in the system. Hydrant flushing.
Valves Monthly: Visually inspect for leaks or cracks.
Annually: Exercise valves.
Backflow Prevention
Devices
Monthly: Visual inspection for leaks or cracks.
Annually: Testing all backflows installed in the system, repair, or replacement if necessary.
Hydro-pneumatic
Pressure Tank
Daily: visually inspect for leaks or cracks.
Monthly: flushing out of the bottom drain valve.
Electrical Components
Monthly: Visual inspection of connections, hazards, and damage.
Annually: Insuring connections are tight. Check proper operation of pumps by measuring amperage draw for each well pump when running.
The required operation and monitoring tasks associated with the Water System represent a significant cost incurred by the RMHE Owners. Since the compliance order for uranium maximum contaminant level (MCL) exceedances was issued by the County DER, additional monitoring of the Water System has been required. Consequently, there have been added costs to monitor and sample the wells for uranium and other specific constituents, laboratory testing, and reporting to the County. A detailed breakdown of the O&M plan is in included in Appendix B.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
9 3 Problem Description
This section describes the identified Water System deficiencies that affect the ability of the system to comply with regulations and provide a reliable, efficient, and safe source of drinking water that meets water quality standards. The groundwater source water quality affects the reliability of the Water System to produce drinking water compliant with water quality standards. In addition, the RMHE Owners incur a significant cost to have the Water System operated and maintained by Quality Service. Several options can address the issue of poor water quality, such as developing a new well or constructing a groundwater treatment facility, but only consolidation with a public water will address the cost to operate and maintain the Water System.
3.1 Water Quality
The Water System groundwater source has concentrations of uranium that exceed the MCL of 10 mg/L.
On May 10, 2016, the County DER issued a citation (Citation No. DER-16CO-006) to RMHE for uranium concentration exceedances of the MCL. County Compliance Order No. DER-16CO-006 is included in Appendix C. The original sample was collected in June 2015 from water produced by the South Well (PS Code 5000090-002). As a result, the Water System was required to begin quarterly uranium monitoring of each non-compliant well. Table 4 shows the uranium monitoring results provided by RMHE to the County DER.
Table 4 – Quarterly Uranium Monitoring Results (in pCi/L) Sample
Quarter
2nd Quarter
2015
3rd Quarter
2015
4th Quarter
2015
1st Quarter
2016
Running Annual
Average
South Well 24.0 23.0 22.0 20.0 19.0 21.1
The County DER determined that the Water System violated the California Health and Safety Code, Section 116555 and Section 64442, Title 22, CCR, since the water produced by the South Well during the monitoring period exceeded the uranium MCL on average. More recent samples taken from each active well in 2018 show, both, the South Well and South West Well exceeded the uranium MCL. The RMHE Owners post a Public Health Notice each quarter for exceedance of the 20 pCi/L MCL established for uranium, the first having been issued in September 2016 and the most recent issued for the 2nd quarter of 2020 in July.
Table 5 and Table 6 summarize the water quality for constituents sampled from 2017-2018 for the South Well and South West Well, respectively. The full Summary of Source Water Quality report is included in Appendix D.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
10 Table 5 – Water Quality Data for South Wella
Chemical or Constituent Sampling Date Result MCL Unit
Calcium 2/14/2017 100 mg/L
Chloride 2/14/2017 35.5 500 mg/L
Hardness (as CaCO3) 2/14/2017 309.4 mg/L
Nitrate (as N) 7/2/2018 9.5 10 mg/L
Sulfate (as SO4) 2/14/2017 47.4 500 mg/L
TDS 2/14/2017 504 1000 mg/L
Gross Alpha 8/15/2018 19.2 15 pCi/L
Uranium (FWL Report) 8/15/2018 19 20 pCi/L
Uranium (FGL Report) 8/15/2018 29.9 20 µg/L
Total Aluminum 9/5/2017 1300 1000 µg/L
Total Arsenic 9/5/2017 ND 10 µg/L
Total Barium 9/5/2017 200 1000 µg/L
Total Iron 2/14/2017 2700 300 µg/L
Total Manganese 2/14/2017 56 50 µg/L
Total Coliform 9/19/2017 ND <1 MPN/1000ML
aQuality Service Summary of Source Water Quality for RMHE MCL = Maximum Contaminant Level
ND = Not Detected
pCi/L = picocuries per liter
Table 6 – Water Quality Data for South West Wella
Chemical or Constituent Sampling Date Result MCL Unit
Calcium 2/14/2017 89.8 mg/L
Chloride 2/14/2017 17.4 500 mg/L
Hardness (as CaCO3) 2/14/2017 322.1 mg/L
Nitrate (as N) 7/2/2018 8.2 10 mg/L
Sulfate (as SO4) 2/14/2017 46 500 mg/L
TDS 2/14/2017 449 1000 mg/L
Gross Alpha 8/15/2018 34.2 15 pCi/L
Uranium (FWL Report) 8/15/2018 26 20 pCi/L
Uranium (FGL Report) 8/15/2018 37.9 20 µg/L
Total Aluminum 9/5/2017 ND 1000 µg/L
Total Arsenic 9/5/2017 ND 10 µg/L
Total Barium 9/5/2017 210 1000 µg/L
Total Iron 2/14/2017 ND 300 µg/L
Total Manganese 2/14/2017 ND 50 µg/L
Total Coliform 9/19/2017 ND <1 MPN/1000ML aQuality Service Summary of Source Water Quality for RMHE MCL = Maximum Contaminant Level
ND = Not Detected
pCi/L = picocuries per liter
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
11 The raw water from the South Well and South West Well have multiple constituents present that are near or above the respective MCL’s, in addition to uranium. In testing performed on February 14th, 2017, nitrates were detected at 9.5 mg/L and 8.2 mg/L in the South Well and South West Well, respectively.
These are just under the 10 mg/L MCL for nitrates and has required additional monitoring by operations staff. In testing performed on August 15th, 2018, the gross alpha levels were detected at 19.2 pCi/L and
34.2 pCi/L in the South Well and South West Well, respectively. These are both above the MCL of 15 pCi/L.
3.2 Operation and Maintenance
Costs to operate and maintain the Water System have resulted in a financial burden on the RMHE customers. The Water System must retain Quality Service to perform the extensive operations and monitoring tasks required to properly maintain the equipment. The costs of these services have increased since the compliance order was issued due to an increase in water quality sampling, lab testing, and reporting.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
12 4 Consolidation Analysis
There are three potential consolidation options to connect to a community water system near the Riverview Mobile Home Estates. Three watersystems within four miles include the City of Hughson, a City of Modesto-owned water system in the unincorporated County island town of Empire, and the Stanislaus Regional Water Authority (SRWA). Each potential service consolidation option will be evaluated as independent alternatives in Section 5. Figure 4 provides an overview of conceptual pipeline improvement alignments for RMHE to consolidate with each agency.
602 LYELL DRIVE, MODESTO, CA 95356 PH. 209.322.1820
I:\J20291 RIVERVIEW MOBILE ESTATES\CAD\TASK-02 RIVERVIEW WATER SYSTEM\REPORTS\ENGINEERING REPORT\FIGURES\FIGURE 4-COMMUNITY WATER SYSTEMS.DWG PLOT: 2/12/2021 3:57:17 PM BY GUSTAVO MANCILLA FIGURE 4
CONCEPTUAL
CONSOLIDATION OPTIONS 0 3000' 6000'
SCALE: 1"=3000'
SANTA FE AVE
E HATCH RD GEER RD ALBERS RD
RIVERVIEW WATER SYSTEM
LEGEND
SRWA
CITY OF EMPIRE
CITY OF HUGHSON
HWY 132 / YOSEMITE BLVD
JANTSEN RD GEER RD
E WHITMORE AVE E WHITMORE AVE
TOULUMNE RIVER
TOULUMNE RIVER
HWY 132 / YOSEMITE BLVD
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
14 5 Alternative Analysis
Improvement alternatives were developed to determine strategies for future improvements to the existing Water System to address the identified deficiencies. Four (4) alternatives were considered to evaluate the project including: 1) No project; 2) On-site water treatment facility; 3) Drilling a new well; and 4) Consolidation with a nearby Community Water System (nearby community water system options include Hughson, Modesto, and the SRWA).
5.1 Alternative 1 – No Project
This alternative assumes the Water System will continue to operate in its present condition and no improvements to the Water System are considered. No improvements to the Water System will result in continued exceedances of the uranium MCL and possible MCL exceedances of other constituents. The long-term health of the RMHE community will be negatively impacted. There will be no immediate capital cost, however the O&M costs for RMHE customers will be significant and increase over time as the water quality declines.
5.2 Alternative 2 – On-site Water Treatment Facility
This alternative includes the construction of an on-site water treatment facility at RMHE that is capable of treating raw groundwater with high levels of uranium and other specific constituents.
The feasibility of constructing a groundwater treatment facility at RMHE was evaluated by Kleinfelder, Inc. in September 2019. Kleinfelder prepared a proposal, included in Appendix E, to design a new treatment facility for removal of uranium and other constituents. The major components of the proposal included discontinuing the use of the South Well by replacing the source with the North Well, installing a new packaged treatment system to remove uranium from the water source utilizing ion exchange technologies, chlorine disinfection, system rehabilitation involving well pump condition assessments and Variable Frequency Drive (VFD) retrofit, storage reservoir upgrades by repurposing the 10,000-gallon hydro-pneumatic pressure tank as a make-shift wet-well for booster pumps, and distribution booster pump station. Kleinfelder’s proposed fee for providing the design in the outlined scope of work was $77,865. Kleinfelder did not provide a construction cost estimate.
Quality Service also prepared a proposal, included in Appendix E, for the design and construction of a new groundwater treatment facility in August 2019. The proposal included design, engineering, and permitting for the installation and testing of a full-scale ion-exchange water filtration system for radium and uranium removal. The major components of the design included discontinuing the use of the South Well in favor of beginning use of the North Well, installation of a new storage tank and booster pump system, filtration system, electrical improvements, and equipment startup and testing. Quality Service’s cost estimate for the entire project totaled $886,293.
The construction of a new groundwater treatment facility to treat the on-site well water for uranium is costly. The cost estimates discussed above do not include the continued O&M costs that the RMHE Water System would require. These costs would increase after the completion of a new groundwater treatment facility due to additional equipment to monitor.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
15 5.3 Alternative 3 – Construction of a New Well
This alterative includes the development of a new on-site well to replace the active wells with high uranium levels. A possible solution to reduce the uranium levels in the RMHE Water System is to drill and develop a new well that could have better water quality than the South Well and the South West Well.
RMHE Owners previously evaluated this option with Quality Service in the past. Kleinfelder drilled a test hole on June 4, 2018 to evaluate the water quality at a potential new well location. The laboratory testing results for the test hole returned high levels of gross alpha and uranium that exceeded DDW MCL’s. The determination was made at the time that development of a new well was not a feasible solution to address the Water System’s problem. Refer to the Summary of Source Water Quality in Appendix D.
5.4 Consolidation Alternatives
Three (3) consolidation options have been considered to address the RMHE Water System’s deficiencies.
A project consisting of consolidation with an established water service agency has common details shared by all three (3) alternatives. Those general commonalities are discussed in this section. For clarity, the water service agencies will be referred to as “Consolidating Agency” and “Consolidating Water System” throughout this section. The unique benefits and challenges associated with each consolidation alternative will be discussed in the following subsections.
The designated Consolidating Agency will own, operate, and maintain a new water transmission pipeline.
The transmission pipeline will establish a connection between the RMHE Water System and the nearest existing transmission main of the Consolidating Water System. The connection point at RMHE will be at the well site south of Jantzen Road at the 6-inch isolation valves located downstream of the existing pressure tank. Each consolidation option will include the following components at a minimum:
• Install a new master meter at the connection to the RMHE Water System inlet to provide usage data for the Consolidating Agency.
• Installation a backflow prevention device at the connection to the RMHE Water System. • Demolish the existing 10,000-gallon hydro-pneumatic pressure tank. • Abandon the wells on site.
• Transmission main from the Consolidating Agency to serve the RMHE Water System All new system infrastructure and facilities will be designed to the Consolidating Agency’s standards. The Consolidating Agency will own, operate, and maintain the proposed transmission pipeline to RMHE, including the master meter. RMHE will own, operate, and maintain the existing RMHE water distribution system and new backflow preventer. The Consolidating Agency will require an easement right-of-way for the new transmission pipeline and facilities.
Consolidation efforts will require a water service agreement between RMHE Owners and the Consolidating Agency to establish the terms of agreement including, at a minimum, the responsibility of each party, physical limits of responsibility for O&M of facilities, and service rates. The water service agreement will require Stanislaus Local Agency Formation Committee (LAFCO) review and approval on the expansion of Consolidating Agency’s jurisdiction and sphere of influence. It is anticipated that the Consolidating Agency will apply for an emergency out-of-boundary service application with LAFCO.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
16 Option 1 – City of Hughson
This option includes the consolidation of the Water System with the City of Hughson (COH) water system.
The COH owns and operates eight (8) groundwater wells, six (6) that were constructed between 1970- 1990 and two (2) new wells developed in 2019. Only five (5) of the eight (8) groundwater wells are currently considered active, with three (3) of five (5) having arsenic treatment capability. The COH was issued Compliance Orders for arsenic and nitrates in 2012, initiating the development of new wells that could treat for arsenic. The COH issued a public notice indicating that their water system has exceeded the arsenic MCL of 10 mg/L over the last four quarters in August 2020.
The nearest existing transmission main of the COH water system is on E Hatch Road. Approximately 1.94 miles of transmission pipeline will be required to connect the RMHE Water System to the COH water system. The new transmission pipeline will need to connect to the COH existing water system via a hot tap tee fitting and addition of gate valves installed per COH standards. Additional improvements required include the following:
• Trench and install transmission pipeline at a 36-inch minimum depth first heading east on Hatch, then North on Geer Road, east on Jantzen Road to the RMHE connection point. • Bore and jack operation to cross the Ceres Main Canal. • The new transmission pipeline will cross the Tuolumne River on Geer Road by connecting to the side of the bridge with U-bolts.
Option 2 –City of Modesto
This option includes the consolidation of the Water System with the City of Modesto (COM) water system.
The COM’s existing water service area consists of one large “contiguous service area” and several smaller “outlying service areas” including Empire, Salida, portions of north Ceres, and several others. The COM’s existing water supply includes surface water and groundwater sources. In the 1990’s, the COM and Modesto Irrigation District (MID) formed a Domestic Water Partnership, and the result was the construction of the Modesto Regional Water Treatment Plant (MRWTP) that became operational in 1995.
The MRWTP is owned and operated by MID and the COM purchases wholesale treated surface water from MID. The MRWTP’s current average supply is 60 million gallons per day (mgd). The COM has a total of 92 existing groundwater wells in the contiguous service area, 77 of which are currently active. The active groundwater wells have the capacity to supply approximately 107 mgd of groundwater. The COM’s contiguous service area is primarily supplied by water from the MRWTP, with the groundwater supply serving to supplement the treated surface water supply.
The portion of the COM service area that is nearest to the RMHE is in the outlying town of Empire. Empire is located on State Highway 132/Yosemite Avenue, east of the COM. Empire is primarily served by a supply of treated surface water from the MRWTP.
The nearest existing transmission main of the COM water system in Empire is on East Yosemite Avenue.
Approximately 3.89 miles of new transmission pipeline will be required to connect the water systems, making this the longest length of pipeline required out of all consolidation options. The new transmission pipeline will need to connect to the COM existing water system via a hot tap tee fitting. Additional improvements required include the following:
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
17 • Trench and install transmission pipeline at a 36-inch minimum depth from Empire heading east on Yosemite Avenue, south on Geer Road, and east on Jantzen Road to the RMHE connection point.
• Bore and jack operation to cross Modesto Lateral Number One.
Option 3 – Stanislaus Regional Water Authority
This option includes the consolidation of the Water System with SRWA water system. The cities of Ceres and Turlock are currently supplied solely by groundwater sources. The cities of Ceres and Turlock formed the SRWA in 2015. SRWA is currently in partnership with Turlock Irrigation District (TID) to construct a multi-benefit Regional Surface Water Treatment Plant (RSWTP) to diversify regional water supplies. The project consists of an intake structure on the Tuolumne River, pump station, water treatment plant, and pipelines to deliver water to service areas. The project is set to begin in 2021 and the new RSWTP is expected to be operational by 2023. RMHE will connect to the SRWA water system by connecting to one of the future delivery pipelines from the RSWTP.
Based on a review of SRWA Regional Surface Water Supply Project drawings, the nearest transmission force main (FM) of the SRWA water system will be a new 30-inch FM that will be installed parallel to the Ceres Main Canal on the north bank. The Ceres Main Canal (and future 30-inch FM) intersects Geer Road at the intersection of E Hatch Road and Geer Road. This will be the ideal location to connect a transmission pipeline that leads to the RHME Water System. The new transmission line will need to connect to the SRWA existing water system via a tee fitting. Approximately 1.26 miles of new transmission pipeline will be required to connect the water systems, making this the shortest length of pipeline required out of all consolidation options. Additional improvements required include the following:
• Trench and install transmission pipeline at a 36-inch minimum depth from the connection point at E Hatch Road and Geer Road, north on Geer Road, and east on Jantzen Road to the RMHE connection point.
• The new transmission pipeline will cross the Tuolumne River on Geer Road by connecting to the side of the bridge with U-bolts.
5.5 Alternative Evaluation
Alternative 1 – No Project was not evaluated as this alternative does not address the Water System deficiencies. Alternative 2 – On-site Water Treatment Facility and Alternative 3 – New Well Development were not evaluated as past efforts to address the Water System deficiencies included these options and they were determined not feasible. Alterative 4 – Consolidation is determined to be the most feasible alternative to address the Water System deficiencies. The three options for consolidation were evaluated and assigned scores based on financial and non-financial criteria, using a weighting factor system.
The evaluation criteria in this Report includes considerations for life cycle costs, environmental sustainability, operations and maintenance, and community impacts and benefits. Each option was reviewed based on the evaluation criteria shown in Table 7. The weighting factors were determined based on each criterion’s relative importance, with higher weighting factors for criteria judged to have greater importance in the evaluation.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
18 Table 7 – Evaluation Criteria
# Evaluation Criteria Weighting Factor, %
1 30-year Life Cycle Cost 20
2 Environmental Sustainability 20
3 Operations and Maintenance 20
4 Community Impacts and Benefits 40
The three options were scored from the most desirable (3) to the least desirable (1) for each evaluation criterion. The evaluation criteria are summarized in the following sections. 30-year Life Cycle Cost
Capital costs and O&M costs for each alternative were developed and incorporated into a 30-year life cycle cost (LCC). The LCC assumed a real interest rate of 1.5 percent. Table 8 provides a summary of the estimated costs. Scoring of the options for this category was based on the estimated LCC. The option with the lowest LCC was given the highest score. The option with the highest LCC was given the lowest score.
Table 8 – Estimated Life Cycle Cost Scoring
Option and Description
Project
Cost
Annual
O&M Cost
30-yr Life
Cycle Cost Score
Option 1 – Consolidation with City of Hughson $4,117,542 $65,107 $5,680,000 2 Option 2 – Consolidation with City of Modesto $7,777,666 $76,082 $9,600,000 1 Option 3 – Consolidation with SRWA $2,681,750 $61,328 $4,150,000 3 Detailed cost estimates for each alternative are included in Appendix F.
Environmental Sustainability
Environmental sustainability considerations include the protection of natural resources, climate change, water and energy efficiency, and efficient use of land. The State Planning Priorities, as listed in Section 6504.1 of the Government Code were key factors that were also used to assign a score to an option’s environmental sustainability. This portion of the Government Code is intended to promote equity, strengthen the economy, protect the environment, and promote public health and safety in the State.
The factors specifically listed in the State Planning Priorities include: 1) Promote infill development; 2) Protect environmental and agricultural resources; and 3) Encourage efficient development patterns. Table 9 presents the scoring of the three options, from most desirable (3) to least desirable (1) with regard to environmental sustainability.
Table 9 – Environmental Sustainability Scoring
Alternative 4 Option and Description Score
Option 1 – Consolidation with City of Hughson 1
Option 2 – Consolidation with City of Modesto 2
Option 3 – Consolidation with SRWA 3
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
19 Option 3, consolidation with SRWA, was assigned the highest score because this alternative provides infrastructure to deliver a source of water that has compliant drinking water quality. Option 3 does this in the most efficient way compared with other options because Option 3 requires the least length of new transmission pipeline, minimizing the impact of construction on the public. It also has the lowest project cost, minimizing the burden on taxpayers. Construction of the transmission pipeline can take place in parallel with the construction of the RSWTP, reducing the overall impact to the public.
Option 1, Consolidation with the COH, was assigned the lowest score because this option does not immediately address the need of a water source with compliant drinking water quality. The COH water system is solely supplied by groundwater which has arsenic concentrations that tested above the MCL recently.
Operations and Maintenance
Operations and maintenance criteria consider the ease associated with each option for operating and maintaining the system. Options that are simpler or require less equipment and labor received the highest score. Due to each consolidation option requiring the same amount of O&M tasks at the RMHE site, options were evaluated only on the cost to maintain the transmission pipeline and distance for operations staff to travel to the RMHE site. All three options eliminate O&M responsibilities of RMHE staff. Table 10 presents the scores of the three options, from most desirable (3) to least desirable (1) with regard to O&M.
Table 10 – Operation and Maintenance Scoring
Option and Description Score
Option 1 – Consolidation with City of Hughson 2
Option 2 – Consolidation with City of Modesto 1
Option 3 – Consolidation with SRWA 3
Option 3 received the highest score due to proximity of the upstream connection point to RHME.
Operators would have the least distance to travel outside the existing reach of their service area to provide routine inspections. No options considered are expected to significantly increase the O&M responsibilities of each respective water system agency.
Community Impacts and Benefits
Community impacts and benefits consider the effect that each option may have on the community.
Options 2 and 3 equally benefit the community of RMHE by providing a reliable water source of good quality. Scoring of each option will consider impacts construction will have on the community outside of RMHE and evaluate any potential impacts on the community currently served by the agency of each consolidation option. Table 11 lists the scores for the three options, from most desirable (3) to least desirable (1).
Table 11 – Community Impacts and Benefits Scoring
Option and Description Score
Option 1 – Consolidation with City of Hughson 1
Option 2 – Consolidation with City of Modesto 2
Option 3 – Consolidation with SRWA 3
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
20 Option 3 was assigned the highest score because this option will have the least impact on the public during construction. This is due to the shorter length of transmission pipeline required which causes the least amount of traffic interruption during construction. It can also be constructed at the same time as the SRWA RSWTP construction, avoiding two separate instances of traffic interruption. Providing the RMHE community with high quality treated surface water will directly address the current issue they face.
Option 1 was assigned the lowest score because of the combination of the water quality issues currently associated with the COH water system and the impact construction activities would have on the community. Option 1 is the only alternative that involves consolidation with a water system that is solely dependent on groundwater sources. These groundwater sources have had recent history of exceeding the arsenic MCL. Consolidation with this water system would cause an additional burden on the community for a problem they are already addressing. This option also requires boring and jacking to cross the Ceres Main Canal. The bore and jack operation would have to take place in or near residential areas and could have a significant impact on the community.
Summary
Table 12 summarizes the raw score and weighted scores assigned to each option. Option 3 had the highest total weighted score of 3.0. Based on the evaluation criteria, Option 3 is the recommended project.
Table 12 – Raw Scores and Weighted Scores for Options
Option 1 Option 2 Option 3
Consolidation
with SRWA
Consolidation
with COH
Consolidation
with COM
# Evaluation Criteria
Weighting
Factor
Raw
Rank
Weighted
Score
Raw
Rank
Weighted
Score
Raw
Rank
Weighted
Score
1 30-year Life Cycle
Cost
0.2 2.0 0.4 1.0 0.2 3.0 0.6
2 Environmental
Sustainability
0.2 1.0 0.2 2.0 0.4 3.0 0.6
3 Operations and
Maintenance
0.2 2.0 0.4 1.0 0.2 3.0 0.6
4 Community Impacts
and Benefits
0.4 1.0 0.4 2.0 0.8 3.0 1.2
Total Weighted Score 1.0 1.4 1.6 3.0
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
21 6 Selected Project
The selected project is Alternative 4, Option 3 – Consolidation with SRWA. Consolidation with SRWA addresses the Water System deficiencies identified in the problem description by accomplishing the following:
• Providing a reliable water source to meet drinking water quality requirements. • Eliminating the O&M of the well water system responsibilities and reducing costs incurred by RMHE. SRWA would take over responsibility of operating and maintaining the distribution system.
No land will be purchased or acquired for this project. Right-of-way or easement acquisition is anticipated for the installation of the transmission pipeline within roadways or in shoulders. Coordination with landowners and investigation of existing utilities along the proposed route of the transmission pipeline are features of the design that will need to be carefully considered.
This project will require negotiation with SRWA to establish a water service agreement between RMHE Owners and the SRWA. This agreement will establish the terms of agreement including, at a minimum, the responsibility of each party, physical limits of responsibility for O&M of facilities, and service rates.
LAFCO requirements and coordination will be necessary to expand the SRWA’s Sphere of Influence to include the RMHE. LAFCO coordination will include additional fees to the project that are accounted for in the cost estimate. The project will be consistent with the SRWA standards and the Department of Public Works Stanislaus County Standards and Specifications.
The new water system will have a new master meter installed at the RMHE distribution system service connection. Since the new water source will be treated surface water that is compliant with drinking water standards, the water meter and abandonment of two (2) active wells are considered green components of the project. Abandoning two (2) active wells and one (1) inactive well and transitioning to a supply of treated surface water helps balance the demand on water sources and protects against the overdrawing of groundwater aquifers. This project includes the demolition of a 10,000-gallon hydro-pneumatic storage tank as the connection to the SRWA water system will provide sufficient capacity to meet the potable water system MDD.
The SRWA project construction
6.1 Major Project Components
The major project components and estimated useful life of the project are presented in Table 13.
Table 13 – Project Components Estimated Useful Life
Component Useful Life (years)
Transmission Structures (Pipes) 35
Valves 15 to 35
Water Meter 25
Backflow Preventer 15 to 35 aBased on the Environmental Protection Agency (EPA) typical values Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
22 7 Cost Estimate
The total estimated project cost for the selected project is $2,681,750. The total cost includes construction and project administration, planning, design, environmental, and field investigations, all of which are eligible under the SWRCB DWSRF Program. Soft costs for engineering and construction services are based on 15-percent of the construction cost. Table 14 summarizes the budget cost for the project.
Table 14 – Estimated Project Cost
System Improvement Description Qty Unit Unit Cost Total Mobilization/Demobilization 1 LS $78,000 $78,000
Demolition and Removal of Existing Equipment 1 LS $8,000 $8,000 Well Abandonment 1 LS $6,000 $6,000
Traffic Control 1 LS $110,000 $110,000
Sheeting and Shoring 1 LS $24,000 $24,000
12" Water Line 6652 LF $160 $1,064,320
Tapping Sleeve and Valve 1 EA $6,000 $6,000
Connect to Existing Piping 2 EA $5,000 $10,000
12" Gate Valve 2 EA $2,650 $5,300
Backflow Preventer 1 EA $10,000 $10,000
Trench Resurfacing 6652 LF $44 $292,688
6" Diameter Water Master Meter 1 EA $6,000 $6,000
Disinfection and Testing 1 LS $10,000 $10,000
Easement Acquisition and Permits 1 LS $20,000 $20,000
Construction Subtotal $1,650,308
Contingency (25%) $412,577
Construction Total $2,062,885
Engineering, Environmental, Field Investigation (15% construction cost) $309,433 Construction Management & Administration (15% construction cost) $309,433 Estimated Total Project Cost $2,681,750
The total anticipated O&M cost to SRWA to incorporate RMHE into their water system is approximately $3,640. The annual cost to RMHE for SRWA water supply based on monthly water meter charge and water rate charge for maximum monthly usage is approximately $57,688.
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
23 8 Proposed Schedule
The proposed schedule for implementing the selected project is presented in Table 15. The project schedule includes the planning phase tasks for engineering, environmental, and field investigations through construction phase tasks, including completing the application for construction funding.
Table 15 – Project Schedule
Task Estimated Date of Completion
Planning and Design Phase
Approval of Engineering Report March 2021 (Completed)
Prop 1 TA Work Plan Approval
(Estimated review time – 6 Months)
September 2021
Long-Term Affordability Study December 2021
Draft Amendment for Environmental Document/CEQA
Submit Environmental Documents
June 2022
September 2022
Water Service Agreement with SRWA
LAFCO Approval of Consolidation
April 2022
May 2022
30% Plans and Specifications
100% Final Plans and Specifications
March 2022
June 2022
Field Investigations/ROW Easements June 2022
Draft Construction Planning Application
Construction Application Submitted by SRWA
July 2022
August 2022
Construction Phase (Contingent on SWRA Construction
Completion Date in beginning of 2023)
Advertise Project for Bidding April 2023 – June 2023
Award Construction Contract
(Estimated Final Budget Authorization Review – 3 Months) September 2023
Construction October 2023 – November 2023
Project Closeout December 2023
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
A
Appendix A
Water System Permit
Riverview Mobile Home Estates Water System
Feasibility Study Report
April 2021
B
Appendix B
Water System Documents
SOUTH WELL HISTORIC FLOW RECORDS
2017 2015 2014 2013 2012Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD 3‐Jan‐17 3,157,460 Cuft 1,365.10 GPD 8‐Jan‐15 2,312,370 Cuft 8,867.96 GPD 3‐Jan‐14 1,759,710 Cuft 7,756.76 GPD 2‐Jan‐13 1,175,770 Cuft 15,014.85 GPD 9‐Jan‐12 659,470 Cuft 0.00 GPD 7‐Feb‐17 3,160,760 Cuft 705.26 GPD 15‐Jan‐15 2,320,080 Cuft 8,238.69 GPD 9‐Jan‐14 1,766,350 Cuft 8,277.87 GPD 7‐Jan‐13 1,181,860 Cuft 9,110.64 GPD 13‐Feb‐12 693,680 Cuft 7,311.17 GPD 7‐Mar‐17 3,160,870 Cuft 29.39 GPD 22‐Jan‐15 2,327,300 Cuft 7,715.09 GPD 16‐Jan‐14 1,773,650 Cuft 7,800.57 GPD 14‐Jan‐13 1,188,900 Cuft 7,522.74 GPD 12‐Mar‐12 724,110 Cuft 8,129.16 GPD 11‐Apr‐17 3,162,160 Cuft 275.69 GPD 29‐Jan‐15 2,335,100 Cuft 8,334.86 GPD 23‐Jan‐14 1,780,510 Cuft 7,330.40 GPD 21‐Jan‐13 1,198,500 Cuft 10,258.29 GPD 16‐Apr‐12 759,290 Cuft 7,518.47 GPD 12‐May‐17 3,167,070 Cuft 1,184.74 GPD 5‐Feb‐15 2,342,580 Cuft 7,992.91 GPD 30‐Jan‐14 1,788,100 Cuft 8,110.46 GPD 28‐Jan‐13 1,206,680 Cuft 8,740.91 GPD 22‐May‐12 812,500 Cuft 11,055.86 GPD 13‐Jun‐17 3,167,070 Cuft 0.00 GPD 12‐Feb‐15 2,350,190 Cuft 8,131.83 GPD 6‐Feb‐14 1,794,330 Cuft 6,657.20 GPD 4‐Feb‐13 1,214,300 Cuft 8,142.51 GPD 11‐Jun‐12 845,040 Cuft 12,169.96 GPD 12‐Jul‐17 3,168,960 Cuft 487.49 GPD 19‐Feb‐15 2,357,920 Cuft 8,260.06 GPD 13‐Feb‐14 1,800,820 Cuft 6,935.03 GPD 11‐Feb‐13 1,221,660 Cuft 7,864.69 GPD 16‐Jul‐12 911,230 Cuft 14,145.75 GPD 26‐Feb‐15 2,364,600 Cuft 7,138.06 GPD 20‐Feb‐14 1,807,440 Cuft 7,073.94 GPD 18‐Feb‐13 1,229,890 Cuft 8,794.34 GPD 13‐Aug‐12 959,350 Cuft 12,854.91 GPD 5‐Mar‐15 2,371,630 Cuft 7,512.06 GPD 27‐Feb‐14 1,814,700 Cuft 7,757.83 GPD 25‐Feb‐13 1,236,610 Cuft 7,180.80 GPD 11‐Sep‐12 1,012,070 Cuft 13,598.12 GPD 12‐Mar‐15 2,379,140 Cuft 8,024.97 GPD 6‐Mar‐14 1,820,720 Cuft 6,432.80 GPD 4‐Mar‐13 1,244,410 Cuft 8,334.86 GPD 1‐Oct‐12 1,043,880 Cuft 11,896.94 GPD 2016 19‐Mar‐15 2,387,080 Cuft 8,484.46 GPD 13‐Mar‐14 1,828,290 Cuft 8,089.09 GPD 11‐Mar‐13 1,251,450 Cuft 7,522.74 GPD 5‐Nov‐12 1,089,490 Cuft 9,747.51 GPD Date Meter Rdg. Average GPD 26‐Mar‐15 2,395,250 Cuft 8,730.23 GPD 20‐Mar‐14 1,836,820 Cuft 9,114.91 GPD 18‐Mar‐13 1,259,860 Cuft 8,986.69 GPD 3‐Dec‐12 1,115,550 Cuft 6,961.74 GPD 7‐Jan‐16 2,780,520 Cuft 8,043.20 GPD 2‐Apr‐15 2,404,380 Cuft 9,756.06 GPD 27‐Mar‐14 1,847,040 Cuft 10,920.80 GPD 29‐Mar‐13 1,268,380 Cuft 5,793.60 GPD 4‐Feb‐16 2,810,750 Cuft 8,075.73 GPD 9‐Apr‐15 2,412,640 Cuft 8,826.40 GPD 3‐Apr‐14 1,856,300 Cuft 9,894.97 GPD 1‐Apr‐13 1,275,770 Cuft 18,425.73 GPD 1‐Mar‐16 2,840,490 Cuft 8,555.97 GPD 16‐Apr‐15 2,421,160 Cuft 9,104.23 GPD 10‐Apr‐14 1,865,060 Cuft 9,360.69 GPD 8‐Apr‐13 1,283,070 Cuft 7,800.57 GPD 5‐Apr‐16 2,884,280 Cuft 9,358.55 GPD 23‐Apr‐15 2,429,590 Cuft 9,008.06 GPD 17‐Apr‐14 1,875,140 Cuft 10,771.20 GPD 15‐Apr‐13 1,290,880 Cuft 8,345.54 GPD 3‐May‐16 2,929,500 Cuft 12,080.20 GPD 30‐Apr‐15 2,439,070 Cuft 10,130.06 GPD 24‐Apr‐14 1,885,610 Cuft 11,187.94 GPD 22‐Apr‐13 1,300,810 Cuft 10,610.91 GPD 7‐Jun‐16 2,972,030 Cuft 9,089.27 GPD 7‐May‐15 2,448,680 Cuft 10,268.97 GPD 1‐May‐14 1,895,780 Cuft 10,867.37 GPD 6‐May‐13 1,323,510 Cuft 12,128.29 GPD 12‐Jul‐16 2,972,420 Cuft 83.35 GPD 14‐May‐15 2,457,490 Cuft 9,414.11 GPD 8‐May‐14 1,906,920 Cuft 11,903.89 GPD 13‐May‐13 1,333,540 Cuft 10,717.77 GPD 2‐Aug‐16 NO DATA 0.00 GPD 21‐May‐15 2,467,150 Cuft 10,322.40 GPD 15‐May‐14 1,918,220 Cuft 12,074.86 GPD 20‐May‐13 1,345,690 Cuft 12,983.14 GPD 6‐Sep‐16 NO DATA 0.00 GPD 29‐May‐15 2,477,830 Cuft 9,985.80 GPD 22‐May‐14 1,930,000 Cuft 12,587.77 GPD 28‐May‐13 1,359,040 Cuft 12,482.25 GPD 4‐Oct‐16 3,062,170 Cuft 23,976.07 GPD 4‐Jun‐15 2,487,380 Cuft 11,905.67 GPD 29‐May‐14 1,942,220 Cuft 13,057.94 GPD 4‐Jun‐13 1,369,330 Cuft 10,995.60 GPD 1‐Nov‐16 3,146,120 Cuft 22,426.64 GPD 11‐Jun‐15 2,499,060 Cuft 12,480.91 GPD 5‐Jun‐14 1,957,840 Cuft 16,691.09 GPD 10‐Jun‐13 1,386,520 Cuft 21,430.20 GPD 6‐Dec‐16 3,152,350 Cuft 1,331.44 GPD 18‐Jun‐15 2,512,690 Cuft 14,564.63 GPD 12‐Jun‐14 1,973,310 Cuft 16,530.80 GPD 17‐Jun‐13 1,399,880 Cuft 14,276.11 GPD 25‐Jun‐15 2,525,930 Cuft 14,147.89 GPD 19‐Jun‐14 1,987,370 Cuft 15,024.11 GPD 24‐Jun‐13 1,414,440 Cuft 15,558.40 GPD 2‐Jul‐15 2,538,310 Cuft 13,228.91 GPD 26‐Jun‐14 1,999,990 Cuft 13,485.37 GPD 1‐Jul‐13 1,429,590 Cuft 16,188.86 GPD 9‐Jul‐15 2,548,440 Cuft 10,824.63 GPD 3‐Jul‐14 2,014,411 Cuft 15,409.87 GPD 9‐Jul‐13 1,446,940 Cuft 16,222.25 GPD 16‐Jul‐15 2,563,210 Cuft 15,782.80 GPD 10‐Jul‐14 2,028,870 Cuft 15,450.47 GPD 15‐Jul‐13 1,461,840 Cuft 18,575.33 GPD 23‐Jul‐15 2,576,360 Cuft 14,051.71 GPD 17‐Jul‐14 2,042,540 Cuft 14,607.37 GPD 22‐Jul‐13 1,480,040 Cuft 19,448.00 GPD 30‐Jul‐15 2,586,200 Cuft 10,514.74 GPD 24‐Jul‐14 2,055,360 Cuft 13,699.09 GPD 30‐Jul‐13 1,495,260 Cuft 14,230.70 GPD 6‐Aug‐15 2,595,420 Cuft 9,852.23 GPD 31‐Jul‐14 2,069,000 Cuft 14,575.31 GPD 5‐Aug‐13 1,507,000 Cuft 14,635.87 GPD 13‐Aug‐15 2,604,810 Cuft 10,033.89 GPD 7‐Aug‐14 2,080,160 Cuft 11,925.26 GPD 12‐Aug‐13 1,520,000 Cuft 13,891.43 GPD 20‐Aug‐15 2,613,730 Cuft 9,531.66 GPD 14‐Aug‐14 2,092,560 Cuft 13,250.29 GPD 19‐Aug‐13 1,538,590 Cuft 19,864.74 GPD 27‐Aug‐15 2,623,440 Cuft 10,375.83 GPD 21‐Aug‐14 2,105,150 Cuft 13,453.31 GPD 2‐Sep‐13 1,570,480 Cuft 17,038.37 GPD 3‐Sep‐15 2,632,750 Cuft 9,948.40 GPD 28‐Aug‐14 2,116,780 Cuft 12,427.49 GPD 9‐Sep‐13 1,586,340 Cuft 16,947.54 GPD 1‐Oct‐15 2,669,650 Cuft 9,857.57 GPD 4‐Sep‐14 2,129,430 Cuft 13,517.43 GPD 16‐Sep‐13 1,600,710 Cuft 15,355.37 GPD 5‐Nov‐15 2,712,260 Cuft 9,106.37 GPD 11‐Sep‐14 2,141,310 Cuft 12,694.63 GPD 23‐Sep‐13 1,614,040 Cuft 14,244.06 GPD 4‐Dec‐15 2,743,960 Cuft 8,176.41 GPD 18‐Sep‐14 2,153,230 Cuft 12,737.37 GPD 7‐Oct‐13 1,638,930 Cuft 13,298.37 GPD 25‐Sep‐14 2,164,740 Cuft 12,299.26 GPD 14‐Oct‐13 1,651,530 Cuft 13,464.00 GPD 2‐Oct‐14 2,175,150 Cuft 11,123.83 GPD 21‐Oct‐13 1,662,880 Cuft 12,128.29 GPD 9‐Oct‐14 2,187,170 Cuft 12,844.23 GPD 28‐Oct‐13 1,674,600 Cuft 12,523.66 GPD 16‐Oct‐14 2,199,130 Cuft 12,780.11 GPD 4‐Nov‐13 1,685,460 Cuft 11,604.69 GPD 23‐Oct‐14 2,210,050 Cuft 11,668.80 GPD 11‐Nov‐13 1,695,050 Cuft 10,247.60 GPD 30‐Oct‐14 2,223,110 Cuft 13,955.54 GPD 18‐Nov‐13 1,705,890 Cuft 11,583.31 GPD 6‐Nov‐14 2,233,710 Cuft 11,326.86 GPD 25‐Nov‐13 1,717,000 Cuft 11,871.83 GPD 13‐Nov‐14 2,244,920 Cuft 11,978.69 GPD 5‐Dec‐13 1,727,360 Cuft 7,749.28 GPD 20‐Nov‐14 2,253,600 Cuft 9,275.20 GPD 12‐Dec‐13 1,736,680 Cuft 9,959.09 GPD 26‐Nov‐14 2,260,660 Cuft 8,801.47 GPD 19‐Dec‐13 1,744,440 Cuft 8,292.11 GPD 4‐Dec‐14 2,269,800 Cuft 8,545.90 GPD 24‐Dec‐13 1,749,340 Cuft 7,330.40 GPD 11‐Dec‐14 2,277,430 Cuft 8,153.20 GPD
18‐Dec‐14 2,289,320 Cuft 12,705.31 GPD23‐Dec‐14 2,294,570 Cuft 3,272.50 GPD30‐Dec‐14 2,301,700 Cuft 7,716.87 GPD
SOUTH WEST WELL HISTORIC FLOW RECORDS
2017 2015 2014 2013 2012Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD Date Meter Rdg. Average GPD 3‐Jan‐17 187.425 AF 8,576.00 GPD 8‐Jan‐15 158.374 AF 7,276.85 GPD 3‐Jan‐14 147.603 AF 5,669.42 GPD 2‐Jan‐13 135.204 AF 14,055.04 GPD 9‐Jan‐12 123.908 AF 0.00 GPD 7‐Feb‐17 189.732 AF 21,476.79 GPD 15‐Jan‐15 158.525 AF 7,028.60 GPD 9‐Jan‐14 147.752 AF 8,091.42 GPD 7‐Jan‐13 135.346 AF 9,254.17 GPD 13‐Feb‐12 124.621 AF 6,638.05 GPD 7‐Mar‐17 191.549 AF 7,469.00 GPD 22‐Jan‐15 158.662 AF 6,376.94 GPD 16‐Jan‐14 147.907 AF 7,214.79 GPD 14‐Jan‐13 135.515 AF 7,866.97 GPD 12‐Mar‐12 125.237 AF 7,168.72 GPD 11‐Apr‐17 194.450 AF 27,006.57 GPD 29‐Jan‐15 158.818 AF 7,261.33 GPD 23‐Jan‐14 148.059 AF 7,075.14 GPD 21‐Jan‐13 135.703 AF 8,751.43 GPD 16‐Apr‐12 125.972 AF 6,842.87 GPD 12‐May‐17 196.947 AF 26,245.00 GPD 5‐Feb‐15 158.961 AF 6,656.22 GPD 30‐Jan‐14 148.222 AF 7,587.16 GPD 28‐Jan‐13 135.880 AF 8,239.38 GPD 22‐May‐12 127.090 AF 10,119.48 GPD 13‐Jun‐17 200.423 AF 35,393.18 GPD 12‐Feb‐15 159.110 AF 6,935.50 GPD 6‐Feb‐14 148.358 AF 6,330.39 GPD 4‐Feb‐13 136.062 AF 8,472.13 GPD 11‐Jun‐12 127.761 AF 10,932.30 GPD 12‐Jul‐17 201.483 AF 11,909.61 GPD 19‐Feb‐15 159.259 AF 6,935.50 GPD 13‐Feb‐14 148.508 AF 6,982.05 GPD 11‐Feb‐13 136.227 AF 7,680.77 GPD 16‐Jul‐12 129.180 AF 13,210.93 GPD 26‐Feb‐15 159.393 AF 6,237.30 GPD 20‐Feb‐14 148.648 AF 6,516.58 GPD 18‐Feb‐13 136.411 AF 8,565.23 GPD 13‐Aug‐12 130.295 AF 12,975.85 GPD 5‐Mar‐15 159.532 AF 6,470.03 GPD 27‐Feb‐14 148.803 AF 7,214.79 GPD 25‐Feb‐13 136.565 AF 7,168.72 GPD 11‐Sep‐12 131.519 AF 13,753.16 GPD 12‐Mar‐15 159.682 AF 6,982.05 GPD 6‐Mar‐14 148.937 AF 6,237.30 GPD 4‐Mar‐13 136.748 AF 8,518.68 GPD 1‐Oct‐12 132.229 AF 11,567.71 GPD 19‐Mar‐15 159.841 AF 7,400.97 GPD 13‐Mar‐14 149.089 AF 7,075.14 GPD 11‐Mar‐13 136.900 AF 7,075.62 GPD 5‐Nov‐12 133.291 AF 9,887.25 GPD 2016 26‐Mar‐15 160.002 AF 7,494.07 GPD 20‐Mar‐14 149.274 AF 8,611.20 GPD 18‐Mar‐13 137.101 AF 9,356.58 GPD 3‐Dec‐12 133.910 AF 7,203.63 GPD Date Meter Rdg. Average GPD 2‐Apr‐15 160.177 AF 8,145.73 GPD 27‐Mar‐14 149.482 AF 9,681.78 GPD 29‐Mar‐13 137.301 AF 5,924.56 GPD 7‐Jan‐16 167.748 AF 8,576.00 GPD 9‐Apr‐15 160.340 AF 7,587.16 GPD 3‐Apr‐14 149.676 AF 9,030.12 GPD 1‐Apr‐13 137.469 AF 18,247.66 GPD 4‐Feb‐16 168.362 AF 7,144.96 GPD 16‐Apr‐15 160.511 AF 7,959.54 GPD 10‐Apr‐14 149.860 AF 8,564.65 GPD 8‐Apr‐13 137.637 AF 7,820.42 GPD 1‐Mar‐16 168.958 AF 7,469.00 GPD 23‐Apr‐15 160.681 AF 7,912.99 GPD 17‐Apr‐14 150.057 AF 9,169.76 GPD 15‐Apr‐13 137.819 AF 8,472.13 GPD 5‐Apr‐16 169.828 AF 8,099.18 GPD 30‐Apr‐15 160.867 AF 8,657.74 GPD 24‐Apr‐14 150.258 AF 9,355.95 GPD 22‐Apr‐13 138.037 AF 10,147.93 GPD 3‐May‐16 170.069 AF 2,804.46 GPD 7‐May‐15 161.054 AF 8,704.29 GPD 1‐May‐14 150.462 AF 9,495.59 GPD 6‐May‐13 138.537 AF 11,637.54 GPD 7‐Jun‐16 172.740 AF 24,865.41 GPD 14‐May‐15 161.227 AF 8,052.63 GPD 8‐May‐14 150.674 AF 9,867.96 GPD 13‐May‐13 138.754 AF 10,101.38 GPD 12‐Jul‐16 176.182 AF 32,042.95 GPD 21‐May‐15 161.416 AF 8,797.38 GPD 15‐May‐14 150.893 AF 10,193.79 GPD 20‐May‐13 139.012 AF 12,009.94 GPD 2‐Aug‐16 178.402 AF 34,444.78 GPD 29‐May‐15 161.629 AF 8,675.20 GPD 22‐May‐14 151.118 AF 10,473.08 GPD 28‐May‐13 139.291 AF 11,364.05 GPD 6‐Sep‐16 181.898 AF 32,545.66 GPD 4‐Jun‐15 161.807 AF 9,666.26 GPD 29‐May‐14 151.351 AF 10,845.45 GPD 4‐Jun‐13 139.509 AF 10,147.93 GPD 4‐Oct‐16 181.989 AF 1,058.94 GPD 11‐Jun‐15 162.044 AF 11,031.64 GPD 5‐Jun‐14 151.627 AF 6,423.49 GPD 10‐Jun‐13 139.820 AF 16,889.94 GPD 1‐Nov‐16 183.082 AF 12,718.97 GPD 18‐Jun‐15 162.314 AF 12,567.69 GPD 12‐Jun‐14 151.938 AF 14,476.12 GPD 17‐Jun‐13 140.090 AF 12,568.54 GPD 6‐Dec‐16 185.542 AF 22,901.12 GPD 25‐Jun‐15 162.567 AF 11,776.39 GPD 19‐Jun‐14 152.194 AF 11,916.03 GPD 24‐Jun‐13 140.404 AF 14,616.74 GPD 2‐Jul‐15 162.857 AF 13,498.63 GPD 26‐Jun‐14 152.429 AF 10,938.55 GPD 1‐Jul‐13 140.749 AF 16,059.80 GPD 9‐Jul‐15 163.155 AF 13,871.01 GPD 3‐Jul‐14 152.701 AF 12,660.78 GPD 9‐Jul‐13 141.143 AF 16,048.16 GPD 16‐Jul‐15 163.408 AF 11,776.39 GPD 10‐Jul‐14 152.990 AF 13,452.08 GPD 15‐Jul‐13 141.507 AF 19,768.29 GPD 23‐Jul‐15 163.672 AF 12,288.41 GPD 17‐Jul‐14 153.243 AF 11,776.39 GPD 22‐Jul‐13 141.843 AF 15,640.85 GPD 30‐Jul‐15 163.868 AF 9,123.21 GPD 24‐Jul‐14 153.482 AF 11,124.73 GPD 30‐Jul‐13 142.179 AF 13,685.74 GPD 6‐Aug‐15 164.052 AF 8,564.65 GPD 31‐Jul‐14 153.756 AF 12,753.88 GPD 5‐Aug‐13 142.425 AF 13,359.89 GPD 13‐Aug‐15 164.231 AF 8,331.91 GPD 7‐Aug‐14 153.982 AF 10,519.62 GPD 12‐Aug‐13 142.685 AF 12,103.04 GPD 20‐Aug‐15 164.422 AF 8,890.48 GPD 14‐Aug‐14 154.219 AF 11,031.64 GPD 19‐Aug‐13 143.078 AF 18,294.21 GPD 27‐Aug‐15 164.615 AF 8,983.57 GPD 21‐Aug‐14 154.452 AF 10,845.45 GPD 2‐Sep‐13 143.718 AF 14,896.05 GPD 3‐Sep‐15 164.796 AF 8,425.01 GPD 28‐Aug‐14 154.670 AF 10,147.25 GPD 9‐Sep‐13 144.058 AF 15,827.05 GPD 1‐Oct‐15 165.530 AF 8,541.37 GPD 11‐Sep‐14 155.127 AF 10,635.99 GPD 16‐Sep‐13 144.346 AF 13,406.44 GPD 5‐Nov‐15 166.365 AF 7,773.35 GPD 18‐Sep‐14 155.364 AF 11,031.64 GPD 23‐Sep‐13 144.612 AF 12,382.34 GPD 4‐Dec‐15 167.011 AF 7,258.12 GPD 25‐Sep‐14 155.586 AF 10,333.43 GPD 7‐Oct‐13 145.117 AF 11,753.91 GPD 2‐Oct‐14 155.789 AF 9,449.04 GPD 14‐Oct‐13 145.376 AF 12,056.49 GPD 9‐Oct‐14 156.027 AF 11,078.19 GPD 21‐Oct‐13 145.626 AF 11,637.54 GPD 16‐Oct‐14 156.256 AF 10,659.26 GPD 28‐Oct‐13 145.871 AF 11,404.79 GPD 23‐Oct‐14 156.451 AF 9,076.67 GPD 4‐Nov‐13 146.100 AF 10,659.98 GPD 30‐Oct‐14 156.651 AF 9,309.40 GPD 11‐Nov‐13 146.305 AF 9,542.78 GPD 6‐Nov‐14 156.855 AF 9,495.59 GPD 18‐Nov‐13 146.540 AF 10,939.28 GPD 13‐Nov‐14 157.070 AF 10,007.61 GPD 25‐Nov‐13 146.870 AF 15,361.55 GPD 20‐Nov‐14 157.238 AF 7,819.90 GPD 5‐Dec‐13 146.917 AF 1,531.50 GPD 26‐Nov‐14 157.372 AF 7,276.85 GPD 12‐Dec‐13 147.107 AF 8,844.53 GPD 4‐Dec‐14 157.556 AF 7,494.07 GPD 19‐Dec‐13 147.261 AF 7,168.72 GPD 11‐Dec‐14 157.705 AF 6,935.50 GPD 24‐Dec‐13 147.429 AF 10,948.59 GPD 18‐Dec‐14 157.925 AF 10,240.34 GPD23‐Dec‐14 158.029 AF 6,777.24 GPD 30‐Dec‐14 158.173 AF 6,702.77 GPD
Quality Service, Inc.
Water & Wastewater Operations / Construction
A General Contractor LIC # 834488
Email: [email protected]
Website: www.qualityserviceinc.net
Telephone: (209) 838-7842
Fax: (209) 838-0699
Escalon, California
OPERATION PLAN
FOR POTABLE WATER SYSTEM
CHLORINATION
River View Mobile Estates
Water System #5000090
8200 Jantzen Road Modesto, CA 95357
Prepared for
Stanislaus County Department of Environmental Resources 3800 Cornucopia Way, Suite C Modesto, CA 95358
Prepared by
Ian Hellstrom
Quality Service, Inc.
March 2015 (Revision #1 6/22/2015)
2 River View Mobile Estates
Water System Operation Plan
March 2015
Table of Contents
Operating Personnel List...............................................................................................................................................3 Operator Personnel...................................................................................................................................................3 On-site Personnel......................................................................................................................................................3 Laboratory .................................................................................................................................................................3 System Description .......................................................................................................................................................4 Source Water Wells...................................................................................................................................................4 Water Storage and Distribution System....................................................................................................................5 Chlorination System Decommissioning........................................................................................................................5 Chlorination System Operation Plan............................................................................................................................7 Daily Checks...............................................................................................................................................................7 Monthly Checks.........................................................................................................................................................7 Quarterly Checks.......................................................................................................................................................8 Six Month Checks......................................................................................................................................................8 Annual Checks...........................................................................................................................................................8 Emergency Response Plan ............................................................................................................................................9 Chemical and Equipment Suppliers ...........................................................................................................................11 System Component Inventory Form ..........................................................................................................................12 3 River View Mobile Estates
Water System Operation Plan
March 2015
I) Operating Personnel List
-Operators and responsibilities: Each contracted distribution operator (CDO) will be responsible to ensure correct operation of the well pumps, water system operations, and water system repairs. Operators will perform the monthly, quarterly, and annual checks. Listed below are employees of Quality Service Inc., address is 2996 McHenry Ave, Escalon, CA 95320.
Name Grade Operator Number Phone (day/night)
Tom McCoy D-4 8642 209-838-7842
Eugene Calais D-1 31873 209-838-7842
Mike Gutierrez D-1 41703 209-838-7842
Kurt Kale D-2 43256 209-838-7842
Brian Holloway D-1 44621 209-838-7842
-On-Site Personnel and responsibilities: Checks pressure in the water distribution system.
Only monitoring will be conducted by on-site staff as they will not make repairs and/or changes in the water distribution system. Visual checks and notification of well head, piping, distribution mains, and pressure tank discrepancies will also be a responsibility of on-site personnel.
Manager’s address: 8200 Jantzen Road, Modesto, CA 95357.
Name Title Phone (day/night)
Jim Cook Maintenance Manager (909)227-9123
Nancy Cook Park Manager (209)577-2803 / (209)573-1653
-Laboratory:
Name Address Phone
Far West Laboratories Inc. 6602 2nd Street Riverbank CA 95367 (209)869-9260 4 River View Mobile Estates
Water System Operation Plan
March 2015
II) System Description
Source Water Wells
The River View Mobile Estates Water System consists of (2) ground water well sources.
Each well contains a submersible pump which is controlled from a pressure switch that is located on the 10,000 gallon hydro pneumatic pressure tank. The current operation allows for the wells to alternate as the lead/ lag source of water. The submersible pumps discharge piping manifold together prior to the inlet connection on the hydro pneumatic pressure tank.
The following is a description for each of the ground water sources; South Well ID# 5000090-002 (Assumed to be) Constructed in 1978 10” diameter steel casing
220’ completed well depth
Annular seal depth/ gravel pack information unknown
20 HP submersible pump, capable of producing 240 gallons per minute Well Construction contains the following items;
4” Galvanized steel discharge piping
Source water sample tap
Check valve
Totalizing Flow Meter
Well system does have an emergency backup generator system South West Well ID# 5000090-013 Constructed in 2004
10’ diameter PVC casing
140’ completed well depth
95’ annular seal depth using bentonite as the sealing material 20 HP submersible pump, capable of producing 300 gallons per minute Well Construction contains the following items;
4” Galvanized steel discharge piping
Source water sample tap
Check valve
Totalizing Flow Meter
Well system does have an emergency backup generator system 5 River View Mobile Estates
Water System Operation Plan
March 2015
Water Storage and Distribution System
The pressure tank for the facility consists of a 10,000 gallon hydro pneumatic pressure tank. The pressure tank provides storage capacity for the water distribution system. After both submersible pump discharge piping manifolds together and prior to the influent tank connection is an existing port. This port will be the location the chlorination injector will be installed. The air balance in the hydro pneumatic pressure tank is provided through an auxiliary air compressor which is mounted on top of the pressure tank and controlled by a probe.
Excess air is released out of the tank by a ¾ inch air volume controller mounted on the tank.
The hydro pneumatic pressure tank contains a 4” drain to waste valve off the bottom of the pressure tank. This allows for periodic flushing to help remove sediment which may have settled at the bottom of the tank. The discharge off the pressure tank consists of a 6” discharge connection with appropriate isolation valves. On the discharge piping a sample tap has been constructed to allow for water quality monitoring.
The pressure tank is also configured with the pressure switch that controls the deep well pumps operation. Also, the pressure tank is equipped with an air release valve that allows for the proper air to water ratio within the pressure tank.
The distribution system consists of 175 customer service connections. Water mains consist of 6” and 8” main line pipe. The System contains 8 fire hydrants and 5 water sample locations.
III) Chlorination System Decommissioning
Proposed steps for the removal of the chlorination system from use at Riverview Mobile Estates: If at any point in the decommissioning process a positive bacteria sample is present for bacteria, a set of repeat samples will be collected, a sample from each well and three sample from the distribution. If the repeat samples are positive, the proper public notification will go out to the residents and the chlorination system will go back on line. Once it is determined the decommissioning process can continue, it will start at day one. If the repeat samples come back clean the decommissioning will continue as proposed. If any bacteria samples come back E. coli positive, confirmation samples will be collected and the chlorination system will be immediately placed in service after the confirmation samples are collected.
Distribution system sampling for Disinfection By-Products and Chromium is no longer be accomplished once the chlorination system is of line.
6 River View Mobile Estates
Water System Operation Plan
March 2015
Day One
Shut off power to the chlorine pump, chlorine analyzer and chlorine alarm system. Verify all operation of all chlorine injection system has stopped.
Day Four
Collect three bacteria samples from the distribution system. One in a centralized location in the park, one upstream and one downstream.
Day Eight
Collect three bacteria samples from the distribution system. One in a centralized location in the park, one upstream and one downstream.
Day Fifteen
Collect three bacteria samples from the distribution system. One in a centralized location in the park, one upstream and one downstream.
Day Twenty Two
Collect three bacteria samples from the distribution system. One in a centralized location in the park, one upstream and one downstream.
Day Twenty Nine
Collect three bacteria samples from the distribution system. One in a centralized location in the park, one upstream and one downstream.
Day Thirty
Neutralize chlorine in the chemical solution tank and dispose of in a proper manner. Clean and store chlorination equipment and maintain on site for future use. Decommissioning complete. 7 River View Mobile Estates
Water System Operation Plan
March 2015
IV) Chlorination System Operation Plan
All operational checks and repairs will either be conducted by the onsite staff or contracted CDO. Only monitoring will be conducted by the onsite staff and repairs will be monitored by CDO.
Daily Checks
1) Visual Inspections of Wells
I. Leaks
II. Hazards
III. Proper operation
IV. Record observations and correct any problems
2) Visual Inspection of the Pressure Tank
I. Leaks
II. Hazards
III. Operating pressure
IV. Record observations and correct any problems
Monthly Checks
One time per month all of the above checks under (daily and weekly checks) will be conducted, in conjunction with the additional items noted below:
1. Source Water Level Monitoring
I. Monitor and record static and pumping draw down levels from each ground water source. Submit findings to Stanislaus County Department of Environmental Recourses on monthly water system report.
II. Record totalizing flow meter readings
2. Analytical Monitoring
In conjunction with the current sampling matrix for the source water samples the following analytical sampling will be conducted either by Quality Service, Inc. CDO/ CTO or California Certified laboratory staff.
I. Routine Bacteria Monitoring
i. Distribution System Monitoring (monthly)
a) Coliform Bacteria monitoring as per sample site plan (2015 revision) 1 sample per month
b) Free Chlorine Residual reading recorded on chain of custody for coliform monitoring.
8 River View Mobile Estates
Water System Operation Plan
March 2015
Quarterly Checks
One time per calendar quarter all the above checks under (daily, weekly and monthly checks) will be conducted, in conjunction with the additional items noted below.
1. Unoccupied Spaces
I. On a quarterly base all unoccupied spaces will be flushed to help maintain water quality within the distribution system.
Six Month Checks
Every six months all the above checks under (daily, weekly, monthly and quarterly checks) will be conducted, in conjunction with the additional items noted below.
1. Distribution System Flushing
I. Flush distribution system at the following locations. Document all findings (i.e. water clarity, how long until water clarity improves, etc.). i. Hydro pneumatic pressure tank drain valve to remove sediment build up on bottom of the tank.
ii. Routine bacteria sample site locations
iii. Fire hydrants
Annual Checks
One time annually all of the above checks under (daily, weekly, monthly, quarterly checks and six month checks) will be conducted, in conjunction with the additional items noted below.
1. Valve Exercise Program
I. In conjunction with the hydrant flushing, the valve exercise program will be established. The valve exercising program will incorporate both new and existing valves that have been identified within the distribution system. Documentation of this valve exercise program will be kept on file and presented to Stanislaus County Department of Environmental Recourses if requested.
2. Backflow Testing
I. In the event that any backflow devices are installed within the distribution system, they will be tested annually to ensure proper operations.
3. Electrical Component Check
I. Tighten all loose lugs and correct all electrical discrepancies.
II. Check the amperage draw on both well pump motors.
9 River View Mobile Estates
Water System Operation Plan
March 2015
V) Emergency Response Plan
1) Flooding: In the event of flooding, the correct authorities will be contacted in accordance with the “Emergency Notification Plan”. Both well heads will be sand bagged as best as possible to protect from surface water intrusion. An “Unsafe Water Alert” notice will be posted. Once the flood waters recede the water system will be evaluated for damage, repairs will be made if necessary, and a minimum four bacteria samples, representative of the water system, will be collected. This site lies outside the 100 and 500 year flood plains.
2) Earthquake: In the event of an earthquake the correct authorities will be contacted in accordance with the “Emergency Notification Plan”. A “Water Outage Notice” notice will be posted. The master meter will be monitored for water loss from possible broken lines or fixtures. All areas where distribution lines are placed will be monitored for evidence of standing water. The water system will be evaluated for damage, repairs will be made if necessary, and four bacteria samples, representative of the water system will be collected.
3) Fire: In the event of a fire the correct authorities will be contacted in accordance with the “Emergency Notification Plan”. A “Water Outage Notice” will be posted. The water system will be evaluated for damage, and repairs will be made as necessary.
Once repairs are made, four bacteria samples will be collected to insure quality. 4) Power Outage: In the event of a power loss and the water system pressure goes below 20 psi the correct authorities will be contacted in accordance with the “Emergency Notification Plan”. A “Water Outage Notice” will be posted and once power is restored to the system four bacteria samples representative of the water system will be collected.
5) Water Contamination: In the event of water contamination the correct authorities will be contacted in accordance with the “Emergency Notification Plan”. The corrective action will be taken in accordance with the Department of Health Services and Stanislaus Department of Environmental Resources guidelines to fix the water contamination problem.
6) Water Outage: In the event of a water outage the correct authorities will be contacted in accordance with the “Emergency Notification Plan”. A “Water Outage Notice” will be posted and once the problem is restored and system water quantity and pressure is restored, four bacteria samples representative of the water system will be collected.
10 River View Mobile Estates
Water System Operation Plan
March 2015
7) Bacteriological Failure: Once the water system is notified from the lab that a bacteria sample is positive, five repeat samples will be collected within a 24 hour period from time of notification. The five repeat samples will be collected in accordance with the sample site plan. The site of failure will be confirmed with the lab by the certified distribution operator. The system will be flushed and the four samples will be collected with chlorine residuals in accordance with the sample site plan. The chlorine residuals will be noted on the lab chain of custody. If any of the repeat samples collected come back positive for bacteria the Stanislaus County Department of Environmental Resources will be contacted immediately. The correct type of notices, for the bacteria count and type, will be posted. The certified distribution operator will conduct an investigation for the possible cause of the bacteria failure. Once the problem is identified the problem will be corrected and the water distribution system will be disinfected. After the disinfection process is complete and all the disinfectant has been out of the distribution system for a minimum of 8 hours, then four “other” bacteria samples will be collected in accordance with the sample site plan. The chlorine residuals that were taken with the samples will be noted on the lab chain of custody. Once all the samples are absent of bacteria Stanislaus County Department of Environmental Resources will be contacted with lab results and the County will lift the notice. 8) Names and Contact Information-Chain of Command
See attached “Emergency Notification Plan”
9) Emergency Notification Procedure: In the event of an emergency, the water system is small enough that posting notices and hand bills should be enough warning for water users of the problems and safety protection procedures that need to be taken to protect themselves during an emergency. The potable water system will remain on a “Do Not Drink” or “Do Not Use” notice until all discrepancies are corrected; all precautionary steps are taken, and will continue normal operation with the permission of Stanislaus County Department of Environmental Resources after all repairs and discrepancies have been made.
10) Emergency Repairs: Emergency procedures to get water system operational will be done by the certified water distribution operator. All repairs and required maintenance will be documented and completed in a timely manner. Bacteria samples will be collected as required and Stanislaus County Department of Environmental Resources will be notified of the cause of the emergency and the work that was done to correct the water problem.
11 River View Mobile Estates
Water System Operation Plan
March 2015
11) Steps to normal operation: Steps to normal operation will be taken in accordance with the guidance given by the Stanislaus Department of Environmental Resources.
VI) Chemical and Equipment Suppliers
-Hypochlorite 12.5% Solution (NSF)
Name Address Phone
Sierra Chemical 1010 Industrial Drive Stockton, CA (209)983-8298 -Chemical Feed Equipment
Name Address Phone
USA Blue Book 4825 E. Cheyenne Avenue, Las Vegas, NV 89115 1-800-548-1234 Ryan Herco 1819 Junction Avenue, San Jose, CA 1-408-436-1141 -Pipe and Fitting Suppliers
Name Address Phone
Ferguson 2201 Crows Landing Road Modesto, CA 95358 (209)538-6760 Ace Hardware 120 F Street Waterford, CA 95386 (209)874-2391 12 River View Mobile Estates
Water System Operation Plan
March 2015
VII) System Component Inventory Form
-Maintenance and Monitoring Schedule
COMPONENT CHECK and FREQUENCY
South Well (ID# 5000090-002)
Monthly: Coliform bacteria sample with a chlorine
residual. (CDO/CTO or Lab Tech) Monitor static
totalizer meter readings, and draw down water
levels. (CDO/CTO)
South West Well (ID# 5000090-013) Daily: visual, hazards (electrical, chemical, etc.), correct operation (On-site)
Monthly: Coliform bacteria sample with a chlorine
residual. (CDO/CTO or Lab Tech) Monitor static
totalizer meter readings, and draw down water
levels. (CDO/CTO)
Distribution System Monthly: One coliform bacteria sample per sample site plan with a chlorine residual. (CDO/CTO or Lab
Tech)
Quarterly: Flushing of unoccupied spaces
(CDO/CTO)
Annually: Testing all backflows installed in the
system. (Certified Tester) Hydrant flushing.
(CDO/CTO)
Valves Monthly: Visually inspect for leaks or cracks.
(CDO/CTO)
Annually: Exercise valves. (CDO/CTO)
Backflow Prevention Devices Monthly: Visual inspection for leaks or cracks. (CDO/CTO)
Annually: Testing all backflows installed in the
system, repair or replacement if necessary.
Hydro-pneumatic Pressure Tank Daily: Visually inspect for leaks or cracks. (On-site) Monthly: Flushing out of the bottom drain valve.
(CDO/CTO)
Electrical Components Monthly: Visual inspection of connections, hazards, and damage. (CDO/CTO)
Annually: Insuring connections are tight. Check
proper operation of pumps by measuring amperage
draw for each well pump when running. (CDO/CTO)
20190044.001A/SAC18M82530 Page 1 of 5 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013
TECHNICAL MEMORANDUM
To: Mr. Bill Ebert
Riverview Mobile Home Estates LLC
2967 Daylight Way
San Jose, California 95111
From: Craig Riddle, PG
Joseph Zilles, PG
Date: August 17, 2018
File: 20190044.001A
RE: Test Well Drilling Results
Riverview MHP
8200 Jantzen Road
Stanislaus County, California
___________________________________________________________________________________ This memorandum presents a description of field activities and results from test well drilling at the subject property. The work was performed in accordance with Kleinfelder’s proposal for services dated March 23, 2018, and industry standards. The scope of work performed includes test well drilling and logging and zone testing for water quality, as described below.
TEST WELL DRILLING AND LOGGING
Prior to mobilizing to the field, Kleinfelder cleared the site for underground utilities by contacting Underground Services Alert (USA). A site meet was conducted with Mr. Dave Frediani to determine the drilling location (Figure 1) and identify know utilities nearby. In addition, a health and safety plan was prepared for field work activities and reviewed each day before work began.
Kleinfelder contracted with Masellis Drilling of Modesto, California, for drilling services. Masellis is C-57 licensed water well contractor in California. Masellis acquired a drilling permit from Stanislaus County and mobilized to the site on June 4, 2018 to begin work.
A Midway 1500 drill rig was utilized by Masellis to drill the test well (KB-01). The boring was drilled to a total depth of the hole (400 feet below ground surface) using a conventional mud rotary drilling system with an 8 inch diameter spade bit. A trench was dug adjacent to the boring and drill rig to circulate drilling fluid and remove drill cuttings from the hole. Lithology was recorded from the drill cuttings and samples were collected every 10 feet or at discernible changes of lithology. A Kleinfelder Professional Geologist (PG) logged the soils encountered according to ASTM D2488. The complete boring log is included in Appendix A. Following drilling of the boring, an electronic log (E-log) was performed by Hydro-Tech Inc. of Madera, California (Appendix B) to further analyze the formation lithology.
20190044.001A/SAC18M82530 Page 2 of 5 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013
ZONE TESTING FOR WATER QUALITY
Upon completion of the E-log, the data was analyzed and 2 zones were identified (120-149 feet and 250-271 feet) for collection of discrete water quality samples. Groundwater was measured in the hole at 77.50 feet below ground surface. The boring was reamed to 295 feet with an 11 inch diameter roller-cone bit using drilling additives to stabilize the hole. A coarse sand was used to backfill the hole from 295 feet to 276 feet, and a bentonite seal was placed from 276 to 271 feet. A 4 inch diameter perforated well screen was placed from 260 to 268 feet, and the coarse sand was used as filter pack around the well screen to a depth of 250 feet, with an upper bentonite seal from 250 to 245 feet.
After the sand pack and seals were placed, the zone was purged by airlifting through the 4 inch pipe using a 1.5 inch air hose with an Ingersoll Rand 375 air compressor. After the sand content decreased and the water clarity improved, the air hose was removed and a Grundfos 1.5 Horsepower, 2 inch diameter pump was installed to further purge the test well. During purging, the water quality parameters were monitored for sand content, pH, temperature, electrical conductivity, total dissolved solids, dissolved oxygen and turbidity.
Once the water quality parameters stabilized, a water sample was collected from the zone (250- 271 feet). Groundwater samples were collected from the sampling port of the discharge piping into laboratory prepared bottles. The bottles were given a unique sample identification label and packaged on ice in cooler pending transportation under chain of custody protocol to the analytical laboratory.
Another water sample was collected from the 120-149 foot zone using the same procedures and methodologies previously described.
The water samples from each zone were submitted to California Laboratory Services (CLS) of Rancho Cordova, California, an accredited analytical laboratory, for analysis by the indicated method for the following:
General Minerals (STDM/EPA)
Sodium Adsorption Ratio, Langelier Index, Aggressive Index (Calculations) Nitrate and Nitrite as N (EPA 300)
Drinking Water Metals, Total and Dissolved (EPA 200)
Cyanide (SM4500- CN E)
Asbestos (EPA 100)
Gross Alpha (EPA 900)
Uranium (EPA 908.0)
Radium 226 (EPA 905.0)
Radium 228 (Ra-05)
Volatile Organic Compounds (EPA 524.2)
1,2-Dibromoethane and 1,2-Dibromo-3-chloropropane (EPA 504) Organochlorine pesticides and polychlorinated biphenyls (EPA 508) Herbicides (EPA 515)
Semi-volatile Organic Compounds (EPA 525)
Carbamates (EPA 531)
20190044.001A/SAC18M82530 Page 3 of 5 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013 Glyphosate (EPA 547)
Endothall (EPA 548)
Diquat (EPA 549)
Dioxin 2,3,7,8-TCDD (EPA 1613)
Coliform and E. Coli (SM 9223)
A complete copy of laboratory analysis reports in presented in Appendix C.
Upon completion of the collection of groundwater samples, the casing and pipes were removed from the boring and the hole was backfilled with sand and gravel to 60 feet below ground surface and then with a bentonite-grout mix to the surface under the observation of a Stanislaus County inspector. The hole was covered with a plywood cover so that the hole can be converted to a well at a later date. If the hole will not be converted to a well, Masellis will return and plug the hole with a concrete cap.
Purge and development water from each zone sample was discharged to the adjacent field on the subject property. Cuttings from the test well were spread on site. Field activities were concluded on June 7, 2018.
ANALYTICAL RESULTS
Shallow 120-149 feet
The following analytes were reported in concentrations exceeding California Title 22 Regulated Drinking Water Maximum Contaminant Levels (MCLs) or Secondary Maximum Contaminant Levels (SMCLs) in the water sample collected from 120-149 feet:
Gross Alpha was detected at a concentration of 51.4 picocuries per liter (pCi/L), exceeding the MCL of 15 pCi/L.
Uranium (radiological) was detected at a concentration of 38.9 pCi/L, exceeding the MCL of 20 pCi/L.
Aluminum (total) was detected at a concentration of 0.27 milligrams per liter (mg/L), exceeding the SMCL of 0.2 mg/L. Dissolved aluminum was not detected above the laboratory reporting limit.
Total Dissolved Solids (TDS) was detected at a concentration of 580 mg/L, exceeding the SMCL recommended range of 500 mg/L.
Total coliform and E. coli (a subset of fecal coliform) were reported as present in the water sample collected at 120-149 feet. Typically for permitted small public water systems the presence of total coliform in more than one water sample in one month is considered to be in exceedance of the MCL.
Deep 250-271 feet
The following analytes were reported in concentrations exceeding California Title 22 Regulated Drinking Water MCLs or SMCLs in the water sample collected from 250-271 feet:
Total aluminum and dissolved aluminum were detected at concentrations of 0.3 mg/L and
0.49 mg/L respectively, exceeding the SMCL of 0.2 mg/L. 20190044.001A/SAC18M82530 Page 4 of 5 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013 Total coliform was reported as present in the water sample collected at 250-271 feet.
For the complete analytical laboratory report see Appendix C.
A blending analysis of the two zones was not completed due to the high variability of the water quality particularly as it pertained to the uranium level found in the shallow zone 38.9 pCi/L which exceeded the MCL of uranium of 20 pCi/L by almost 2x’s.
CONCLUSIONS AND RECOMMENDATIONS
The shallow water sample collected at 120 to 149 feet has exceedances of the MCL or SMCL for gross alpha, uranium, aluminum, and TDS. In addition, both total coliform and E.coli were reported as present. We do not recommend the groundwater from this zone be considered for consumption.
The deep water sample collected at 250 to 271 feet has an exceedance of the SMCL for total aluminum and dissolved aluminum. In addition, total coliform was reported as present. Both aluminum and coliform are relatively easily treated at or near the well head with filtering and disinfection processes. We recommend the deeper zone be considered for production of water for the mobile home park. Based on these results the preliminary well design should include:
8-inch diameter well extending to a total depth of 280 feet. The well screen should extend from 250 to 270 feet.
The bottom ten feet should be a blank sump.
We recommend a gradation analysis be completed on the soil samples collected during drilling to be used for well screen (aperture opening) and filter pack gradation. Soil samples were retained at Kleinfelder’s materials laboratory and can be processed for a fine and coarse grain gradational analyses.
LIMITATIONS
This report was prepared in a manner consistent with that level of care and skill ordinarily exercised by other members of Kleinfelder’s profession practicing in the same locality, under similar conditions and at the date the services are provided. Our conclusions, opinions and recommendations are based on a limited number of observations and data. It is possible that conditions could vary between or beyond the data evaluated. Kleinfelder makes no other representation, guarantee or warranty, express or implied, regarding the services, communication (oral or written), report, opinion, or instrument of service provided.
Kleinfelder offers various levels of investigative and engineering services to suit the varying needs of different clients. It should be recognized that definition and evaluation of geologic and environmental conditions are a difficult and inexact science. Judgments leading to conclusions and recommendations are generally made with incomplete knowledge of the subsurface conditions present due to the limitations of data from field studies. Although risk can never be eliminated, more-detailed and extensive studies yield more information, which may help understand and manage the level of risk. Since detailed study and analysis involves greater expense, our clients participate in determining levels of service that provide adequate information for their purposes at acceptable levels of risk. More extensive studies, including subsurface 20190044.001A/SAC18M82530 Page 5 of 5 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013 studies or field tests, should be performed to reduce uncertainties. Acceptance of this report will indicate that the Client has reviewed the document and determined that it does not need or want a greater level of service than provided.
Kleinfelder makes no representations or warranties, express or implied, as to the accuracy, completeness, timeliness, or rights to the use of such information. These documents are not intended for use as a land survey product nor are they designed or intended as a construction document. The use or misuse of the information contained on these graphic representations is at the sole risk of the party using or misusing the information. 20190044.001A/SAC18M82530 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013 FIGURE
___________________________________________________________________________________ A! KB-01
Esri, HERE, Garmin, © OpenStreetMap contributors, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Copyright:© 2015 DeLorme
£
BORING LOCATION MAP
Riverview MHP
8200 Jantzen Road
Modesto, California
1 20190044.001A
C. Riddle
The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
PROJECT NO.
DRAWN:
DRAWN BY:
CHECKED BY:
FIGURE
www.kleinfelder.com
Detail
Area
Base:
DeLorme World Base, ESRI
Document Path: K:\2018_PROJECTS\20190044.001A-Riverview MHP\cad\20190044_1.mxd FILE NAME:
20190044_1.mxd
Date Saved: 8/10/2018 12:31:06 PM
8/10/2018
D. Ross
0 150 300 600
Feet A! Approximate Boring Location
LEGEND
20190044.001A/SAC18M82530 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013
APPENDIX A
___________________________________________________________________________________ A-1
FIGURE
Riverview MHP
8200 Jantzen Road
Modesto, California
The report and graphics key are an integral part of these logs. All data and interpretations in this log are subject to the explanations and limitations stated in the report.
Lines separating strata on the logs represent approximate boundaries only. Actual transitions may be gradual or differ from those shown.
No warranty is provided as to the continuity of soil or rock conditions between individual sample locations.
Logs represent general soil or rock conditions observed at the point of exploration on the date indicated.
In general, Unified Soil Classification System designations presented on the logs were based on visual classification in the field and were modified where appropriate based on gradation and index property testing.
Fine grained soils that plot within the hatched area on the Plasticity Chart, and coarse grained soils with between 5% and 12% passing the No. 200 sieve require dual USCS symbols, ie., GW-GM, GP-GM, GW-GC, GP-GC, GC-GM, SW-SM, SP-SM, SW-SC, SP-SC, SC-SM.
ABBREVIATIONS
WOH - Weight of Hammer
WOR - Weight of Rod
CL
CL-ML
_
_
_
GM
GC
GW
GP
GW-GM
GW-GC
_ _
_
CH
CLAYEY GRAVELS,
GRAVEL-SAND-CLAY MIXTURES
GRAVELS
WITH >
12%
FINES
>
Cu 4 and
1 Cc 3
>
Cu 6 and/
or 1 Cc 3
>
_
SILTY SANDS, SAND-GRAVEL-SILT
MIXTURES
CLAYEY SANDS,
SAND-GRAVEL-CLAY MIXTURES
SW-SM
CLAYEY SANDS, SAND-SILT-CLAY
MIXTURES
Cu 6 and
1 Cc 3
SC-SM
Cu 4 and
1 Cc 3
< _
ORGANIC SILTS & ORGANIC SILTY CLAYS OF
LOW PLASTICITY
SILTS AND CLAYS
(Liquid Limit
less than 50)
SILTS AND CLAYS
(Liquid Limit
greater than 50)
WELL-GRADED SANDS,
SAND-GRAVEL MIXTURES WITH
LITTLE OR NO FINES
POORLY GRADED SANDS,
SAND-GRAVEL MIXTURES WITH
LITTLE OR NO FINES
MH
OH
ML
GC-GM
COARSE GRAINED SOILS (More than half of material is larger than the #200 sieve) UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2487)
<
Cu 6 and
1 Cc 3
GP-GM
GP-GC
_
_ _
INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
GRAPHICS KEY
<
>
<
<
>
CLEAN
SANDS
WITH
<5%
FINES
GRAVELS (More than half of coarse fraction is larger than the #4 sieve) Cu 6 and/
or 1 Cc 3 >
<
<
SANDS
WITH
5% TO
12%
FINES
SANDS
WITH >
12%
FINES
SANDS (More than half of coarse fraction is smaller than the #4 sieve)
WELL-GRADED SANDS,
SAND-GRAVEL MIXTURES WITH
LITTLE FINES
Cu 4 and/
or 1 Cc 3>
CLEAN
GRAVEL
WITH
<5%
FINES
GRAVELS
WITH
5% TO
12%
FINES
OL
<
>
<
<
>
SP
SP-SM
SP-SC
SM
SC
< _<
>
WELL-GRADED GRAVELS,
GRAVEL-SAND MIXTURES WITH
LITTLE OR NO FINES
POORLY GRADED GRAVELS,
GRAVEL-SAND MIXTURES WITH
LITTLE OR NO FINES
WELL-GRADED GRAVELS,
GRAVEL-SAND MIXTURES WITH
LITTLE FINES
WELL-GRADED GRAVELS,
GRAVEL-SAND MIXTURES WITH
LITTLE CLAY FINES
POORLY GRADED GRAVELS,
GRAVEL-SAND MIXTURES WITH
LITTLE FINES
POORLY GRADED GRAVELS,
GRAVEL-SAND MIXTURES WITH
LITTLE CLAY FINES
SILTY GRAVELS, GRAVEL-SILT-SAND
MIXTURES
CLAYEY GRAVELS,
GRAVEL-SAND-CLAY-SILT MIXTURES
WELL-GRADED SANDS,
SAND-GRAVEL MIXTURES WITH
LITTLE CLAY FINES
POORLY GRADED SANDS,
SAND-GRAVEL MIXTURES WITH
LITTLE CLAY FINES
SW
SW-SC
POORLY GRADED SANDS,
SAND-GRAVEL MIXTURES WITH
LITTLE FINES
Cu 4 and/
or 1 Cc 3 >
>
FINE GRAINED SOILS
(More than half of material
is smaller than
the #200 sieve)
INORGANIC SILTS AND VERY FINE SANDS, SILTY OR
CLAYEY FINE SANDS, SILTS WITH SLIGHT PLASTICITY
ORGANIC CLAYS & ORGANIC SILTS OF
MEDIUM-TO-HIGH PLASTICITY
INORGANIC CLAYS OF HIGH PLASTICITY, FAT
CLAYS
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR SILT
INORGANIC CLAYS-SILTS OF LOW PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
STANDARD PENETRATION SPLIT SPOON SAMPLER
(2 in. (50.8 mm.) outer diameter and 1-3/8 in. (34.9 mm.) inner diameter)
CALIFORNIA SAMPLER
(3 in. (76.2 mm.) outer diameter)
MODIFIED CALIFORNIA SAMPLER
(2 or 2-1/2 in. (50.8 or 63.5 mm.) outer diameter)
BULK / GRAB / BAG SAMPLE
SAMPLER AND DRILLING METHOD GRAPHICS
SHELBY TUBE SAMPLER
AUGER CUTTINGS
PUSH TYPE SAMPLER
HAND AUGER
SONIC CONTINUOUS SAMPLER
HQ CORE SAMPLE
(2.500 in. (63.5 mm.) core diameter)
NOTES
GROUND WATER GRAPHICS
OBSERVED SEEPAGE
WATER LEVEL (level after exploration completion)
WATER LEVEL (level where first observed)
WATER LEVEL (additional levels after exploration)
DRAWN BY: DR
CHECKED BY: CR
DATE: 6/8/2018
REVISED: -
PROJECT NO.: 20190044
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [LEGEND 1 (GRAPHICS KEY) USCS_NOR_CAL] PLOTTED: 06/08/2018 01:24 PM BY: DRoss
CALIFORNIA
SAMPLER
(# blows/ft)
MODIFIED CA
SAMPLER
(# blows/ft)
SPT-N60
(# blows/ft)
A-2
FIGURE
Riverview MHP
8200 Jantzen Road
Modesto, California
The thread is easy to roll and not much time is required to reach the plastic limit. The thread cannot be rerolled after reaching the plastic limit. The lump or thread crumbles when drier than the plastic limit.
It takes considerable time rolling and kneading to reach the plastic limit. The thread can be rerolled several times after reaching the plastic limit. The lump or thread can be formed without crumbling when drier than the plastic limit.
30 - 50
> 50
Medium (M)
High (H)
RELATIVE
DENSITY
(%)
APPARENT
DENSITY
30 - 50
10 - 30
4 - 10
<4
>60
35 - 60
12 - 35
5 - 12
<4
>70
40 - 70
15 - 40
5 - 15
CONSISTENCY
<2
Moist
DESCRIPTION
Strongly
FIELD TEST
Alternating layers of varying material or color with the layer less than 1/4-in. thick, note thickness.
FIELD TEST
Absence of
moisture, dusty,
dry to the touch
Moderately
Will not crumble or
break with finger
pressure
Pocket Pen
(tsf)
Term
of
Use
<5%
With
Modifier
5 to <15%
15%
Trace <15%
15 to <30%
30%
AMOUNT
>30
Very Soft
SOIL DESCRIPTION KEY
DESCRIPTION
Damp but no
visible water
Boulders
Cobbles
coarse
fine
Gravel
Sand
Fines
GRAIN SIZE
>12 in. (304.8 mm.)
3 - 12 in. (76.2 - 304.8 mm.) Fist-sized to basketball-sized 3/4 -3 in. (19 - 76.2 mm.) Thumb-sized to fist-sized
0.19 - 0.75 in. (4.8 - 19 mm.) Pea-sized to thumb-sized #10 - #4 0.079 - 0.19 in. (2 - 4.9 mm.)
0.017 - 0.079 in. (0.43 - 2 mm.)
#200 - #40
coarse
fine
medium
SIEVE SIZE APPROXIMATE SIZE
>12 in. (304.8 mm.) Larger than basketball-sized
3 - 12 in. (76.2 - 304.8 mm.)
3/4 -3 in. (19 - 76.2 mm.)
#4 - 3/4 in. (#4 - 19 mm.)
Rock salt-sized to pea-sized
#40 - #10 Sugar-sized to rock salt-sized
0.0029 - 0.017 in. (0.07 - 0.43 mm.) Flour-sized to sugar-sized Passing #200 <0.0029 in. (<0.07 mm.) Flour-sized and smaller
DESCRIPTION
Secondary
Constituent is
Fine Grained
Secondary
Constituent is
Coarse Grained
SPT - N60
(# blows / ft)
Soft
Stiff
Very Stiff
Hard
2 - 4
4 - 8
8 - 15
15 - 30
Weakly
Crumbles or breaks
with handling or slight
finger pressure
Crumbles or breaks
with considerable finger
pressure
UNCONFINED
COMPRESSIVE
STRENGTH (Qu)(psf)
VISUAL / MANUAL CRITERIA
<500
0.5 PP <1
1 PP <2
2 PP <4
4 PP >8000
4000 - 8000
500 - 1000
1000 - 2000
2000 - 4000
Rounded
Subrounded
Dry
Wet
Visible free water,
usually soil is below
water table
Thumb will penetrate more than 1 inch (25 mm). Extrudes between fingers when squeezed.
Thumb will penetrate soil about 1 inch (25 mm).
Remolded by light finger pressure.
Thumb will penetrate soil about 1/4 inch (6 mm).
Remolded by strong finger pressure.
Can be imprinted with considerable pressure from thumb.
Thumb will not indent soil but readily indented with
thumbnail.
Thumbnail will not indent soil.
Particles have nearly plane sides but have well-rounded corners and edges.
Angular Particles have sharp edges and relatively plane sides with unpolished surfaces.
DESCRIPTION
Fissured
Slickensided
Blocky
Lensed
CRITERIA
Stratified
Laminated
Fracture planes appear polished or glossy, sometimes striated.
Alternating layers of varying material or color with layers at least 1/4-in. thick, note thickness.
Breaks along definite planes of fracture with
little resistance to fracturing.
Cohesive soil that can be broken down into small angular lumps which resist further breakdown.
Inclusion of small pockets of different soils, such as small lenses of sand scattered through a mass of clay; note thickness.
Subangular
Particles have smoothly curved sides and no edges.
Particles are similar to angular description but have rounded edges.
None
Weak
Strong
No visible reaction
DESCRIPTION CRITERIA
A 1/8-in. (3 mm.) thread cannot be rolled at any water
content. NPNon-plastic
The thread can barely be rolled and the lump or thread
cannot be formed when drier than the plastic limit. < 30Low (L) 85 - 100
65 - 85
35 - 65
15 - 35
<5 0 - 15
Very Dense
Dense
Medium Dense
>50
Loose
Very Loose
FROM TERZAGHI AND PECK, 1948
LLDESCRIPTION FIELD TEST
Some reaction,
with bubbles
forming slowly
Violent reaction,
with bubbles
forming
immediately
DESCRIPTION FIELD TEST
PP < 0.25
0.25 PP <0.5
Medium Stiff
APPARENT / RELATIVE DENSITY - COARSE-GRAINED SOIL PLASTICITY
SECONDARY CONSTITUENT MOISTURE CONTENT CEMENTATION
CONSISTENCY - FINE-GRAINED SOIL
FROM TERZAGHI AND PECK, 1948; LAMBE AND WHITMAN, 1969; FHWA, 2002; AND ASTM D2488
REACTION WITH
HYDROCHLORIC ACID
STRUCTURE ANGULARITY
GRAIN SIZE
DRAWN BY: DR
CHECKED BY: CR
DATE: 6/8/2018
REVISED: -
PROJECT NO.: 20190044
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [LEGEND 2 (SOIL DESC KEY)] PLOTTED: 06/08/2018 01:22 PM BY: DRoss Run 1
Run 2
Run 3
Run 4
Sandy SILT (ML): low plasticity, brown, moist, stiff, moderately cemented Poorly Graded SAND (SP): moist, medium dense, fine to coarse rounded sand, non-plastic fines Lean CLAY (CL): medium plasticity, olive gray, moist, stiff Poorly Graded GRAVEL with Sand (GP): dry, fine to coarse subrounded sand and gravel up to 1.5 inches, non-plastic fines
coarser with depth
Lean CLAY (CL): medium plasticity, olive gray, moist, stiff Well-Graded SAND (SW): moist, dense, fine to medium rounded sand, silica, non-plastic fine Mud Rotary
PID / FID (ppmv)
FIELD EXPLORATION
Lithologic Description
PAGE: 1 of 6
A-3
BORING LOG KB-01
Sample Number
FIGURE
Graphical Log
WGS84
Latitude: 37.62568°
Longitude: -120.84329°
Approximate Ground Surface Elevation (ft.): 139.00
Surface Condition: Soil
BORING LOG KB-01
Recovery(NR=No Recovery)
Riverview MHP
8200 Jantzen Road
Modesto, California
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Not Available Drilling Equipment:
6/04/2018
Sunny
Drilling Company:
Exploration Diameter:
Drill Crew:
Midway 1500
Plunge: -90 degrees
C. Riddle
See Drilling Method Column
Patrick
Masellis Drilling
8 in./11 in. O.D.
Drilling Method:
Depth (feet)
5 10
15 20
25 30
35 40
45 50
55 60
65 ApproximateElevation (feet)
135
130
125
120
115
110
105
100
95 90
85 80
75 70
Drilling MethodSample Type
DATE: 6/8/2018
DRAWN BY: DR
REVISED: -
PROJECT NO.: 20190044
CHECKED BY: CR
PLOTTED: 06/08/2018 01:21 PM BY: DRoss
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [_KLF_ENVIRONMENTAL LOG] Run 5
Run 6
Run 7
Run 8
Run 9
Well-Graded SAND (SW): moist, dense, fine to medium rounded sand, silica, non-plastic fine Lean CLAY (CL): medium plasticity, olive gray, moist, stiff Well-Graded SAND (SW): wet, medium dense, fine to medium rounded sand, silica, non-plastic fine Lean CLAY (CL): medium plasticity, olive gray, moist, stiff Poorly Graded SAND (SP): wet, medium dense, fine to medium sand Lean CLAY (CL): medium plasticity, dark gray, moist, very stiff Poorly Graded SAND (SP)
Lean CLAY (CL): medium plasticity, dark gray, moist, hard Poorly Graded GRAVEL with Sand (GP): wet, dense, fine to coarse sand, fine subrounded gravel up to 3/4 inches, non-plastic fines
Poorly Graded SAND (SP): wet, dense, fine to medium sand, non-plastic fines Poorly Graded GRAVEL with Sand (GP): wet, very dense, gravel up to 2 inches, non-plastic fines Mud Rotary
PID / FID (ppmv)
FIELD EXPLORATION
Lithologic Description
PAGE: 2 of 6
A-3
BORING LOG KB-01
Sample Number
FIGURE
Graphical Log
WGS84
Latitude: 37.62568°
Longitude: -120.84329°
Approximate Ground Surface Elevation (ft.): 139.00
Surface Condition: Soil
BORING LOG KB-01
Recovery(NR=No Recovery)
Riverview MHP
8200 Jantzen Road
Modesto, California
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Not Available Drilling Equipment:
6/04/2018
Sunny
Drilling Company:
Exploration Diameter:
Drill Crew:
Midway 1500
Plunge: -90 degrees
C. Riddle
See Drilling Method Column
Patrick
Masellis Drilling
8 in./11 in. O.D.
Drilling Method:
Depth (feet)
75 80
85 90
95 100
105
110
115
120
125
130
135
ApproximateElevation (feet)
65 60
55 50
45 40
35 30
25 20
15 10
5 0
Drilling MethodSample Type
DATE: 6/8/2018
DRAWN BY: DR
REVISED: -
PROJECT NO.: 20190044
CHECKED BY: CR
PLOTTED: 06/08/2018 01:21 PM BY: DRoss
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [_KLF_ENVIRONMENTAL LOG] Run 10
Run 11
Run 12
Run 13
Run 14
Sandy Lean CLAY (CL): olive brown to light reddish brown, moist, stiff, fine to medium sand, medium plasticity fines
reddish brown
Clayey SAND (SC): reddish brown and olive brown, moist, dense, fine to medium sand, low plasticity fines Silty SAND (SM): olive brown, wet, loose, non-plastic fines Lean CLAY with Sand (CL): low plasticity, bluish gray, moist, stiff Mud Rotary
PID / FID (ppmv)
FIELD EXPLORATION
Lithologic Description
PAGE: 3 of 6
A-3
BORING LOG KB-01
Sample Number
FIGURE
Graphical Log
WGS84
Latitude: 37.62568°
Longitude: -120.84329°
Approximate Ground Surface Elevation (ft.): 139.00
Surface Condition: Soil
BORING LOG KB-01
Recovery(NR=No Recovery)
Riverview MHP
8200 Jantzen Road
Modesto, California
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Not Available Drilling Equipment:
6/04/2018
Sunny
Drilling Company:
Exploration Diameter:
Drill Crew:
Midway 1500
Plunge: -90 degrees
C. Riddle
See Drilling Method Column
Patrick
Masellis Drilling
8 in./11 in. O.D.
Drilling Method:
Depth (feet)
145
150
155
160
165
170
175
180
185
190
195
200
205
ApproximateElevation (feet)
-5
-10
-15
-20
-25
-30
-35
-40
-45
-50
-55
-60
-65
-70
Drilling MethodSample Type
DATE: 6/8/2018
DRAWN BY: DR
REVISED: -
PROJECT NO.: 20190044
CHECKED BY: CR
PLOTTED: 06/08/2018 01:21 PM BY: DRoss
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [_KLF_ENVIRONMENTAL LOG] Run 15
Run 16
Run 17
Run 18
Lean CLAY with Sand (CL): low plasticity, bluish gray, moist, stiff Clayey SAND (SC): black to dark brown, wet, dense, fine to medium sand, non-plastic fines coarser with depth
Poorly Graded GRAVEL with Silt and Sand (GP-GM): wet, very dense, fine to coarse sand, fine gravel up to 1/2 inch, non-plastic fines
Mud Rotary
PID / FID (ppmv)
FIELD EXPLORATION
Lithologic Description
PAGE: 4 of 6
A-3
BORING LOG KB-01
Sample Number
FIGURE
Graphical Log
WGS84
Latitude: 37.62568°
Longitude: -120.84329°
Approximate Ground Surface Elevation (ft.): 139.00
Surface Condition: Soil
BORING LOG KB-01
Recovery(NR=No Recovery)
Riverview MHP
8200 Jantzen Road
Modesto, California
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Not Available Drilling Equipment:
6/04/2018
Sunny
Drilling Company:
Exploration Diameter:
Drill Crew:
Midway 1500
Plunge: -90 degrees
C. Riddle
See Drilling Method Column
Patrick
Masellis Drilling
8 in./11 in. O.D.
Drilling Method:
Depth (feet)
215
220
225
230
235
240
245
250
255
260
265
270
275
ApproximateElevation (feet)
-75
-80
-85
-90
-95
-100
-105
-110
-115
-120
-125
-130
-135
-140
Drilling MethodSample Type
DATE: 6/8/2018
DRAWN BY: DR
REVISED: -
PROJECT NO.: 20190044
CHECKED BY: CR
PLOTTED: 06/08/2018 01:21 PM BY: DRoss
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [_KLF_ENVIRONMENTAL LOG] Run 19
Run 20
Run 21
Run 22
Run 23
Clayey SAND (SC): wet, dense, non-plastic fines
Poorly Graded SAND with Gravel (SP): wet, dense, non-plastic fines Sandy Lean CLAY (CL): low plasticity, moist, very stiff, fine to medium sand Poorly Graded ASH (SP): black, wet, dense, fine to medium sand, non-plastic fines Sandy Lean CLAY (CL): low plasticity, moist, stiff
sand lens
Mud Rotary
PID / FID (ppmv)
FIELD EXPLORATION
Lithologic Description
PAGE: 5 of 6
A-3
BORING LOG KB-01
Sample Number
FIGURE
Graphical Log
WGS84
Latitude: 37.62568°
Longitude: -120.84329°
Approximate Ground Surface Elevation (ft.): 139.00
Surface Condition: Soil
BORING LOG KB-01
Recovery(NR=No Recovery)
Riverview MHP
8200 Jantzen Road
Modesto, California
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Not Available Drilling Equipment:
6/04/2018
Sunny
Drilling Company:
Exploration Diameter:
Drill Crew:
Midway 1500
Plunge: -90 degrees
C. Riddle
See Drilling Method Column
Patrick
Masellis Drilling
8 in./11 in. O.D.
Drilling Method:
Depth (feet)
285
290
295
300
305
310
315
320
325
330
335
340
345
ApproximateElevation (feet)
-145
-150
-155
-160
-165
-170
-175
-180
-185
-190
-195
-200
-205
-210
Drilling MethodSample Type
DATE: 6/8/2018
DRAWN BY: DR
REVISED: -
PROJECT NO.: 20190044
CHECKED BY: CR
PLOTTED: 06/08/2018 01:21 PM BY: DRoss
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [_KLF_ENVIRONMENTAL LOG] GROUNDWATER LEVEL INFORMATION:
Run 24
Run 25
Run 26
Sandy Lean CLAY (CL): low plasticity, moist, stiff
Sandy Lean CLAY (CL): medium plasticity, bluish gray, moist, hard, fine to medium sand sand lens
The borehole was terminated at approximately 400 ft. below ground surface. Groundwater was not observed during drilling or after completion.
GENERAL NOTES:
The borehole location and elevation are approximate and were estimated by Kleinfelder.
The boring was backfilled with on June 04, 2018.
Mud Rotary
PID / FID (ppmv)
FIELD EXPLORATION
Lithologic Description
PAGE: 6 of 6
A-3
BORING LOG KB-01
Sample Number
FIGURE
Graphical Log
WGS84
Latitude: 37.62568°
Longitude: -120.84329°
Approximate Ground Surface Elevation (ft.): 139.00
Surface Condition: Soil
BORING LOG KB-01
Recovery(NR=No Recovery)
Riverview MHP
8200 Jantzen Road
Modesto, California
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Not Available Drilling Equipment:
6/04/2018
Sunny
Drilling Company:
Exploration Diameter:
Drill Crew:
Midway 1500
Plunge: -90 degrees
C. Riddle
See Drilling Method Column
Patrick
Masellis Drilling
8 in./11 in. O.D.
Drilling Method:
Depth (feet)
355
360
365
370
375
380
385
390
395
400
405
410
415
ApproximateElevation (feet)
-215
-220
-225
-230
-235
-240
-245
-250
-255
-260
-265
-270
-275
-280
Drilling MethodSample Type
DATE: 6/8/2018
DRAWN BY: DR
REVISED: -
PROJECT NO.: 20190044
CHECKED BY: CR
PLOTTED: 06/08/2018 01:21 PM BY: DRoss
gINT FILE: Klf_gint_master_2017 PROJECT NUMBER: 20190044.001A OFFICE FILTER: SACRAMENTOgINT TEMPLATE: E:KLF_STANDARD_GINT_LIBRARY_2017.GLB [_KLF_ENVIRONMENTAL LOG] 20190044.001A/SAC18M82530 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013
APPENDIX B
___________________________________________________________________________________
20190044.001A/SAC18M82530 August 17, 2018
© 2018 Kleinfelder www.kleinfelder.com
KLEINFELDER 2882 Prospect Park Dr., Suite 200, Rancho Cordova, CA 95670 p | 916.366-1701 f | 916.366-7013
APPENDIX C
___________________________________________________________________________________ Kleinfelder (Sacramento)
Enclosed are the results of analyses for samples received by the laboratory on 06/06/18 14:11. Samples were analyzed pursuant to client request utilizing EPA or other ELAP approved methodologies. I certify that the results are in compliance both technically and for completeness.
Analytical results are attached to this letter. Please call if we can provide additional assistance.
Sincerely,
James Liang, Ph.D.
Laboratory Director
CA SWRCB ELAP Accreditation/Registration number 1233
Project Name: Riverview MHP
Rancho Cordova, CA 95742
2882 Prospect Park Dr. suite 200
Joe Zilles
July 20, 2018 CLS Work Order #: 18F0272
COC #: 29379
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Chlorinated Pesticides and PCBs by EPA Method 508
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 Aldrin ND 0.075 µg/L 1 1804641 06/07/18 06/09/18 EPA 508 Chlordane ND 0.10 " " " " " "
Chlorothalonil ND 5.0 " " " " " "
Dieldrin ND 0.020 " " " " " "
Endrin ND 0.10 " " " " " "
gamma-BHC (Lindane) ND 0.20 " " " " " "
Heptachlor ND 0.010 " " " " " "
Heptachlor epoxide ND 0.010 " " " " " "
Hexachlorobenzene ND 0.50 " " " " " "
Hexachlorocyclopentadiene ND 1.0 " " " " " "
Methoxychlor ND 10 " " " " " "
Polychlorinated Biphenyls (Total " " " " "
PCBs)
ND 0.50 "
Propachlor ND 0.50 " " " " " "
Toxaphene ND 1.0 " " " " " "
Surrogate: Decachlorobiphenyl 82 % 50-150 " " " "
Surrogate: Tetrachloro-meta-xylene 75 % 50-150 " " " "
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Conventional Chemistry Parameters by APHA/EPA Methods
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 Aggressive Index 12.4 N/A 1 1804882 06/13/18 06/13/18 NONE Bicarbonate as CaCO3 290 5.0 mg/L " 1804718 06/08/18 06/08/18 SM2320B Calcium 80 1.0 " " 1804874 06/12/18 06/13/18 200.7/2340B Carbonate as CaCO3 ND 5.0 " " 1804718 06/08/18 06/08/18 SM2320B Chloride 45 2.5 " 5 1804642 06/07/18 06/08/18 EPA 300.0 Cyanide (total) ND 0.0050 " 1 1804712 06/08/18 06/08/18 SM4500-CN E Fluoride ND 0.10 " " 1804642 06/07/18 06/07/18 EPA 300.0 Hardness as CaCO3 300 1.0 " " 1804874 06/12/18 06/13/18 200.7/2340B Hydroxide as CaCO3 ND 5.0 " " 1804718 06/08/18 06/08/18 SM2320B Langlier Index 0.14 Std. Units " 1804883 06/13/18 SM 203, 16th Ed.
06/13/18
Magnesium 24 1.0 mg/L " 1804874 06/12/18 06/13/18 200.7/2340B MBAS as LAS, mol wt 340 ND 0.10 " " 1804678 06/07/18 06/07/18 SM5540 C Nitrate as N 6.7 0.40 " " 1804642 06/07/18 06/07/18 EPA 300.0 Nitrite as N ND 0.40 " " " " " "
pH 7.62 0.01 pH Units " 1804668 06/07/18 06/07/18 SM4500-H B HT-F Potassium 5.8 1.0 mg/L " 1804874 06/12/18 06/13/18 200.7/2340B Sodium 54 1.0 " " " " " "
sqrt(meq/L 1804887 06/13/18
)
Sodium Adsorption Ratio 1.3 " 06/13/18 None
Specific Conductance (EC) 710 1.0 µmhos/cm " 1804677 06/07/18 06/07/18 EPA 120.1 Sulfate as SO4 44 2.5 mg/L 5 1804642 06/07/18 06/08/18 EPA 300.0 Total Alkalinity 290 5.0 " 1 1804718 06/08/18 06/08/18 SM2320B Total Dissolved Solids 440 10 " " 1804709 06/08/18 06/11/18 SM2540C 3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
EDB and DBCP by EPA Method 504.1
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 1,2-Dibromo-3-chloropropane ND 0.010 µg/L 1 1804667 06/07/18 06/07/18 EPA 504.1 Ethylene dibromide ND 0.020 " " " " " "
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Metals by EPA 200 Series Methods
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 Uranium ND 20 µg/L 1 1804759 06/11/18 07/12/18 EPA 200.8 3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Metals (Dissolved) by EPA 200 Series Methods
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 Aluminum 490 50 µg/L 1 1804874 06/12/18 06/13/18 EPA 200.7 Antimony ND 4.0 " " 1804858 06/13/18 06/13/18 EPA 200.8 Arsenic 3.3 2.0 " " " " " "
Barium 290 100 " " 1804874 06/12/18 06/13/18 EPA 200.7
Beryllium ND 1.0 " " " " " "
Boron ND 100 " " " " " "
Cadmium ND 1.0 " " 1804858 06/13/18 06/13/18 EPA 200.8
Chromium ND 10 " " 1804874 06/12/18 06/13/18 EPA 200.7
Copper ND 50 " " " " " "
Iron 300 100 " " " " " "
Lead ND 5.0 " " 1804858 06/13/18 06/13/18 EPA 200.8
Manganese ND 20 " " 1804874 06/12/18 06/13/18 EPA 200.7 Mercury ND 0.20 " " 1804802 06/11/18 06/13/18 EPA 245.1 Nickel ND 10 " " 1804858 06/13/18 06/13/18 EPA 200.8
Selenium ND 5.0 " " " " " "
Silver ND 10 " " 1804874 06/12/18 06/13/18 EPA 200.7
Thallium ND 1.0 " " 1804858 06/13/18 06/14/18 EPA 200.8 Vanadium 7.4 3.0 " " " " 06/13/18 "
Zinc ND 50 " " 1804874 06/12/18 06/13/18 EPA 200.7
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Metals (Drinking Water) by EPA 200 Series Methods
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 Aluminum 300 50 µg/L 1 1804705 06/08/18 06/08/18 EPA 200.7 Antimony ND 4.0 " " 1804759 06/11/18 06/11/18 EPA 200.8 Arsenic 4.6 2.0 " " " " " "
Barium 340 100 " " 1804705 06/08/18 06/08/18 EPA 200.7
Beryllium ND 1.0 " " " " " "
Boron 180 100 " " " " " "
Cadmium ND 1.0 " " 1804759 06/11/18 06/11/18 EPA 200.8
Chromium ND 10 " " 1804705 06/08/18 06/08/18 EPA 200.7
Copper ND 50 " " " " " "
Iron 290 100 " " " " 06/11/18 "
Lead ND 5.0 " " 1804759 06/11/18 06/11/18 EPA 200.8
Manganese 20 20 " " 1804705 06/08/18 06/08/18 EPA 200.7 Mercury ND 1.0 " " 1804802 06/11/18 06/13/18 EPA 245.1
Nickel ND 10 " " 1804759 06/11/18 06/11/18 EPA 200.8
Selenium ND 5.0 " " " " " "
Silver ND 10 " " " " " "
Thallium ND 1.0 " " " " " "
Vanadium 13 3.0 " " " " " "
Zinc ND 50 " " 1804705 06/08/18 06/08/18 EPA 200.7
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Microbiological Parameters by APHA Standard Methods
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 E. Coli Absent 0.0 N/A 1 1804636 06/06/18 06/07/18 SM 9223 Total Coliforms Present 0.0 " " " " " "
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Purgeable Organic Compounds by EPA Method 524.2
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 1,1,1-Trichloroethane ND 0.50 µg/L 1 1804837 06/11/18 06/11/18 EPA 524.2 1,1,2,2-Tetrachloroethane ND 0.50 " " " " " "
1,1,2-Trichloro-1,2,2-trifluoroethane " " " " "
(Freon 113)
ND 10 "
1,1,2-Trichloroethane ND 0.50 " " " " " "
1,1-Dichloroethane ND 0.50 " " " " " "
1,1-Dichloroethene ND 0.50 " " " " " "
1,2,4-Trichlorobenzene ND 0.50 " " " " " "
1,2-Dichlorobenzene ND 0.50 " " " " " "
1,2-Dichloroethane ND 0.50 " " " " " "
1,2-Dichloropropane ND 0.50 " " " " " "
1,4-Dichlorobenzene ND 0.50 " " " " " "
Benzene ND 0.50 " " " " " "
Carbon tetrachloride ND 0.50 " " " " " "
Chlorobenzene ND 0.50 " " " " " "
cis-1,2-Dichloroethene ND 0.50 " " " " " "
cis-1,3-Dichloropropene ND 0.50 " " " " " "
Ethylbenzene ND 0.50 " " " " " "
Methyl tert-butyl ether ND 3.0 " " " " " "
Methylene chloride ND 0.50 " " " " " "
Styrene ND 0.50 " " " " " "
Tetrachloroethene ND 0.50 " " " " " "
Toluene ND 0.50 " " " " " "
Total Trihalomethanes (THM) ND 0.50 " " " " " "
trans-1,2-Dichloroethene ND 0.50 " " " " " "
trans-1,3-Dichloropropene ND 0.50 " " " " " "
Trichloroethene ND 0.50 " " " " " "
Trichlorofluoromethane ND 5.0 " " " " " "
Vinyl chloride ND 0.50 " " " " " "
Xylenes (total) ND 0.50 " " " " " "
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Purgeable Organic Compounds by EPA Method 524.2
Analyte Result Limit
Reporting
Units Dilution Batch Prepared Analyzed Method Notes
KB-01-264 (18F0272-01) DW Sampled: 06/06/18 10:40 Received: 06/06/18 14:11 Surrogate: 1,2-Dichloroethane-d4 98 % 66-135 1804837 " 06/11/18 EPA 524.2 Surrogate: 4-Bromofluorobenzene 109 % 70-130 " " " "
Surrogate: Toluene-d8 98 % 70-130 " " " "
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Chlorinated Pesticides and PCBs by EPA Method 508 - Quality Control Batch 1804641 - EPA 3510B GCNV
Blank (1804641-BLK1) Prepared: 06/07/18 Analyzed: 06/09/18 Aldrin ND 0.075 µg/L
Chlordane ND 0.10 "
Chlorothalonil ND 5.0 "
Dieldrin ND 0.020 "
Endrin ND 0.10 "
gamma-BHC (Lindane) ND 0.20 "
Heptachlor ND 0.010 "
Heptachlor epoxide ND 0.010 "
Hexachlorobenzene ND 0.50 "
Hexachlorocyclopentadiene ND 1.0 "
Methoxychlor ND 10 "
Propachlor ND 0.50 "
Toxaphene ND 1.0 "
Polychlorinated Biphenyls (Total PCBs) ND 0.50 "
Surrogate: Tetrachloro-meta-xylene 0.189 " 0.250 76 50-150 Surrogate: Decachlorobiphenyl 0.230 " 0.250 92 50-150
LCS (1804641-BS1) Prepared: 06/07/18 Analyzed: 06/09/18 Aldrin 0.440 0.075 0.500 µg/L 88 50-130
Dieldrin 0.497 0.020 0.500 " 99 48-129
gamma-BHC (Lindane) 0.458 0.20 0.500 " 92 49-127
Surrogate: Tetrachloro-meta-xylene 0.163 " 0.250 65 50-150 Surrogate: Decachlorobiphenyl 0.208 " 0.250 83 50-150
LCS Dup (1804641-BSD1) Prepared: 06/07/18 Analyzed: 06/09/18 Aldrin 0.473 0.075 0.500 µg/L 95 7 50-130 30
Dieldrin 0.520 0.020 0.500 " 104 4 48-129 30
gamma-BHC (Lindane) 0.487 0.20 0.500 " 97 6 49-127 30
Surrogate: Tetrachloro-meta-xylene 0.186 " 0.250 74 50-150 Surrogate: Decachlorobiphenyl 0.231 " 0.250 92 50-150
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Conventional Chemistry Parameters by APHA/EPA Methods - Quality Control Batch 1804642 - General Preparation
Blank (1804642-BLK1) Prepared & Analyzed: 06/07/18
Fluoride ND 0.10 mg/L
Chloride ND 0.50 "
Sulfate as SO4 ND 0.50 "
Nitrite as N ND 0.40 "
Nitrate as N ND 0.40 "
LCS (1804642-BS1) Prepared & Analyzed: 06/07/18
Chloride 4.77 0.50 5.00 mg/L 95 80-120
Sulfate as SO4 4.62 0.50 5.00 " 92 80-120
Fluoride 2.08 0.10 2.00 " 104 80-120
Nitrite as N 2.00 0.40 2.00 " 100 80-120
Nitrate as N 2.01 0.40 2.00 " 101 80-120
LCS Dup (1804642-BSD1) Prepared & Analyzed: 06/07/18
Chloride 4.81 0.50 5.00 mg/L 96 0.9 80-120 20
Sulfate as SO4 4.62 0.50 5.00 " 92 0.1 80-120 20
Fluoride 2.04 0.10 2.00 " 102 2 80-120 20
Nitrite as N 2.00 0.40 2.00 " 100 0.2 80-120 20
Nitrate as N 2.04 0.40 2.00 " 102 1 80-120 20
Matrix Spike (1804642-MS1) Source: 18F0265-02 Prepared & Analyzed: 06/07/18 Sulfate as SO4 71.9 0.50 5.00 69.6 mg/L 45 80-120 QM-4X Chloride 57.9 0.50 5.00 58.7 " NR 80-120 QM-4X
Fluoride 1.63 0.10 2.00 0.155 " 74 80-120 QM-7
Nitrite as N 1.32 0.40 2.00 " ND 66 80-120 QM-7
Nitrate as N 1.89 0.40 2.00 0.456 " 72 80-120 QM-7
Matrix Spike Dup (1804642-MSD1) Source: 18F0265-02 Prepared & Analyzed: 06/07/18 Sulfate as SO4 72.0 0.50 5.00 69.6 mg/L 47 0.1 80-120 20 QM-4X Chloride 58.1 0.50 5.00 58.7 " NR 80-120 0.2 20 QM-4X
Fluoride 2.31 0.10 2.00 0.155 " 108 34 80-120 20 QM-7
Nitrite as N 1.36 0.40 2.00 " ND 68 3 80-120 20 QM-7
Nitrate as N 1.93 0.40 2.00 0.456 " 74 2 80-120 20 QM-7 3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Conventional Chemistry Parameters by APHA/EPA Methods - Quality Control Batch 1804677 - General Preparation
Blank (1804677-BLK1) Prepared & Analyzed: 06/07/18
Specific Conductance (EC) ND 1.0 µmhos/cm
Batch 1804678 - General Preparation
Blank (1804678-BLK1) Prepared & Analyzed: 06/07/18
MBAS as LAS, mol wt 340 ND 0.10 mg/L
LCS (1804678-BS1) Prepared & Analyzed: 06/07/18
MBAS as LAS, mol wt 340 0.460 0.10 0.500 mg/L 92 80-120 LCS Dup (1804678-BSD1) Prepared & Analyzed: 06/07/18
MBAS as LAS, mol wt 340 0.456 0.10 0.500 mg/L 91 0.9 80-120 20 Matrix Spike (1804678-MS1) Source: 18F0272-01 Prepared & Analyzed: 06/07/18 MBAS as LAS, mol wt 340 0.403 0.10 0.500 mg/L ND 81 75-125 Matrix Spike Dup (1804678-MSD1) Source: 18F0272-01 Prepared & Analyzed: 06/07/18 MBAS as LAS, mol wt 340 0.400 0.10 0.500 mg/L ND 80 0.7 75-125 25 Batch 1804709 - General Preparation
Blank (1804709-BLK1) Prepared: 06/08/18 Analyzed: 06/11/18 Total Dissolved Solids ND 10 mg/L
Duplicate (1804709-DUP1) Source: 18F0278-01 Prepared: 06/08/18 Analyzed: 06/11/18 Total Dissolved Solids 358 10 340 mg/L 5 20
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Conventional Chemistry Parameters by APHA/EPA Methods - Quality Control Batch 1804712 - General Preparation
Blank (1804712-BLK1) Prepared & Analyzed: 06/08/18
Cyanide (total) ND 0.0050 mg/L
LCS (1804712-BS1) Prepared & Analyzed: 06/08/18
Cyanide (total) 0.0880 0.0050 0.100 mg/L 88 75-125
LCS Dup (1804712-BSD1) Prepared & Analyzed: 06/08/18
Cyanide (total) 0.0891 0.0050 0.100 mg/L 89 1 75-125 25 Matrix Spike (1804712-MS1) Source: 18F0242-01 Prepared & Analyzed: 06/08/18 Cyanide (total) 0.0898 0.0050 0.100 0.00350 mg/L 86 75-125 Matrix Spike Dup (1804712-MSD1) Source: 18F0242-01 Prepared & Analyzed: 06/08/18 Cyanide (total) 0.0917 0.0050 0.100 0.00350 mg/L 88 2 75-125 25 Batch 1804718 - General Preparation
Blank (1804718-BLK1) Prepared & Analyzed: 06/08/18
Total Alkalinity ND 5.0 mg/L
Bicarbonate as CaCO3 ND 5.0 "
Carbonate as CaCO3 ND 5.0 "
Hydroxide as CaCO3 ND 5.0 "
Duplicate (1804718-DUP1) Source: 18F0257-01 Prepared & Analyzed: 06/08/18 Total Alkalinity 203 5.0 200 mg/L 2 20
Bicarbonate as CaCO3 203 5.0 200 " 2 20
Carbonate as CaCO3 ND 5.0 " ND 20
Hydroxide as CaCO3 ND 5.0 " ND 20
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Conventional Chemistry Parameters by APHA/EPA Methods - Quality Control Batch 1804874 - 6010A/No Digestion
Blank (1804874-BLK1) Prepared: 06/12/18 Analyzed: 06/13/18 Calcium ND 1.0 mg/L
Hardness as CaCO3 ND 1.0 "
Magnesium ND 1.0 "
Potassium ND 1.0 "
Sodium ND 1.0 "
LCS (1804874-BS1) Prepared: 06/12/18 Analyzed: 06/13/18 Calcium 4.95 1.0 5.00 mg/L 99 85-115
Magnesium 4.81 1.0 5.00 " 96 85-115
Potassium 5.17 1.0 5.00 " 103 85-115
Sodium 4.89 1.0 5.00 " 98 85-115
Matrix Spike (1804874-MS1) Source: 18F0573-06 Prepared: 06/12/18 Analyzed: 06/13/18 Calcium 99.7 1.0 5.00 97.0 mg/L 53 70-130 QM-4X
Magnesium 44.7 1.0 5.00 41.1 " 73 70-130
Potassium 6.59 1.0 5.00 1.70 " 98 70-130
Sodium 56.1 1.0 5.00 52.5 " 70 70-130
Matrix Spike (1804874-MS2) Source: 18F0574-05 Prepared: 06/12/18 Analyzed: 06/13/18 Calcium 24.1 1.0 54.9 mg/L 70-130 QM-7
Magnesium 25.7 1.0 26.6 " 70-130 QM-7
Potassium 15.8 1.0 " ND 70-130 QM-7
Sodium 101 1.0 34.1 " 70-130 QM-7
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
EDB and DBCP by EPA Method 504.1 - Quality Control
Batch 1804667 - EPA 504.1
Blank (1804667-BLK1) Prepared & Analyzed: 06/07/18
Ethylene dibromide ND 0.020 µg/L
1,2-Dibromo-3-chloropropane ND 0.010 "
LCS (1804667-BS1) Prepared & Analyzed: 06/07/18
Ethylene dibromide 0.263 0.020 0.286 µg/L 92 60-140
1,2-Dibromo-3-chloropropane 0.272 0.010 0.286 " 95 60-140 LCS Dup (1804667-BSD1) Prepared & Analyzed: 06/07/18
Ethylene dibromide 0.304 0.020 0.286 µg/L 107 14 60-140 30 1,2-Dibromo-3-chloropropane 0.312 0.010 0.286 " 109 14 60-140 30 Matrix Spike (1804667-MS1) Source: 18F0272-01 Prepared & Analyzed: 06/07/18 Ethylene dibromide 0.305 0.020 0.286 µg/L ND 107 60-140 1,2-Dibromo-3-chloropropane 0.291 0.010 0.286 " ND 102 60-140 Matrix Spike Dup (1804667-MSD1) Source: 18F0272-01 Prepared & Analyzed: 06/07/18 Ethylene dibromide 0.307 0.020 0.286 µg/L ND 108 0.7 60-140 30 1,2-Dibromo-3-chloropropane 0.282 0.010 0.286 " ND 99 3 60-140 30 3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals by EPA 200 Series Methods - Quality Control
Batch 1804759 - EPA 200 Series
Blank (1804759-BLK1) Prepared & Analyzed: 06/11/18
Uranium ND 20 µg/L
LCS (1804759-BS1) Prepared & Analyzed: 06/11/18
Uranium 106 20 100 µg/L 106 85-115
Matrix Spike (1804759-MS1) Source: 18F0246-01 Prepared & Analyzed: 06/11/18 Uranium 120 20 100 0.230 µg/L 119 70-130
Matrix Spike (1804759-MS2) Source: 18F0291-01 Prepared & Analyzed: 06/11/18 Uranium 115 20 100 0.0100 µg/L 115 70-130
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Dissolved) by EPA 200 Series Methods - Quality Control Batch 1804802 - EPA 7470A
Blank (1804802-BLK1) Prepared: 06/11/18 Analyzed: 06/13/18 Mercury ND 0.20 µg/L
LCS (1804802-BS1) Prepared: 06/11/18 Analyzed: 06/13/18 Mercury 4.59 0.20 5.00 µg/L 92 85-115
Matrix Spike (1804802-MS1) Source: 18F0171-01 Prepared: 06/11/18 Analyzed: 06/13/18 Mercury 4.62 0.20 5.00 µg/L ND 92 70-130
Matrix Spike Dup (1804802-MSD1) Source: 18F0171-01 Prepared: 06/11/18 Analyzed: 06/13/18 Mercury 4.71 0.20 5.00 µg/L ND 94 2 70-130 25
Batch 1804858 - EPA 200 Series
Blank (1804858-BLK1) Prepared: 06/13/18 Analyzed: 07/09/18 Antimony ND 4.0 µg/L
Arsenic ND 2.0 "
Cadmium ND 1.0 "
Lead ND 5.0 "
Nickel ND 10 "
Selenium ND 5.0 "
Silver ND 10 "
Vanadium ND 3.0 "
Thallium ND 1.0 "
LCS (1804858-BS1) Prepared: 06/13/18 Analyzed: 07/09/18 Antimony 96.5 4.0 100 µg/L 97 85-115
Arsenic 103 2.0 100 " 103 85-115
Cadmium 109 1.0 100 " 109 85-115
Lead 104 5.0 100 " 104 85-115
Nickel 106 10 100 " 106 85-115
Selenium 109 5.0 100 " 109 85-115
Silver 106 10 100 " 106 85-115
Vanadium 105 3.0 100 " 105 85-115
Thallium 105 1.0 100 " 105 85-115
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Dissolved) by EPA 200 Series Methods - Quality Control Batch 1804858 - EPA 200 Series
LCS Dup (1804858-BSD1) Prepared: 06/13/18 Analyzed: 07/09/18 Antimony 95.5 4.0 100 µg/L 96 1 85-115 20
Matrix Spike (1804858-MS1) Source: 18F0573-06 Prepared & Analyzed: 06/13/18 Arsenic 153 2.0 100 1.23 µg/L 152 70-130 QM-7
Cadmium 103 1.0 100 0.360 " 103 70-130
Lead 98.3 5.0 100 0.280 " 98 70-130
Nickel 92.2 10 100 4.62 " 88 70-130
Selenium 179 5.0 100 5.24 " 174 70-130 QM-7
Silver 86.9 10 100 0.300 " 87 70-130
Vanadium 98.4 3.0 100 3.13 " 95 70-130
Thallium 102 1.0 100 1.31 " 101 70-130
Batch 1804874 - 6010A/No Digestion
Blank (1804874-BLK1) Prepared: 06/12/18 Analyzed: 06/13/18 Aluminum ND 50 µg/L
Barium ND 100 "
Boron ND 100 "
Beryllium ND 1.0 "
Chromium ND 10 "
Copper ND 50 "
Iron ND 100 "
Manganese ND 20 "
Silver ND 10 "
Zinc ND 50 "
LCS (1804874-BS1) Prepared: 06/12/18 Analyzed: 06/13/18 Aluminum 5150 50 5000 µg/L 103 85-115
Barium 993 100 1000 " 99 85-115
Boron 951 100 1000 " 95 85-115
Beryllium 1030 1.0 1000 " 103 85-115
Chromium 1000 10 1000 " 100 85-115
Copper 1020 50 1000 " 102 85-115
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Dissolved) by EPA 200 Series Methods - Quality Control Batch 1804874 - 6010A/No Digestion
LCS (1804874-BS1) Prepared: 06/12/18 Analyzed: 06/13/18 Iron 995 100 1000 µg/L 100 85-115
Manganese 995 20 1000 " 100 85-115
Silver 917 10 1000 " 92 85-115
Zinc 1050 50 1000 " 105 85-115
Matrix Spike (1804874-MS1) Source: 18F0573-06 Prepared: 06/12/18 Analyzed: 06/13/18 Aluminum 4910 50 5000 µg/L ND 98 70-130
Barium 1070 100 1000 115 " 95 70-130
Boron 1180 100 1000 248 " 93 70-130
Beryllium 1000 1.0 1000 0.684 " 100 70-130
Chromium 941 10 1000 " ND 94 70-130
Copper 906 50 1000 " ND 91 70-130
Iron 957 100 1000 11.6 " 95 70-130
Manganese 917 20 1000 4.64 " 91 70-130
Silver 826 10 1000 " ND 83 70-130
Zinc 940 50 1000 " ND 94 70-130
Matrix Spike (1804874-MS2) Source: 18F0574-05 Prepared: 06/12/18 Analyzed: 06/13/18 Aluminum 39.3 50 µg/L ND 70-130 QM-7
Barium 122 100 106 " 70-130 QM-7
Boron 648 100 257 " 70-130 QM-7
Beryllium ND 1.0 " ND 70-130 QM-7
Chromium ND 10 " ND 70-130 QM-7
Copper 10.3 50 " ND 70-130 QM-7
Iron 144 100 7.41 " 70-130 QM-7
Manganese 16.0 20 636 " 70-130 QM-7
Silver ND 10 " ND 70-130 QM-7
Zinc 17.4 50 " ND 70-130 QM-7
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Drinking Water) by EPA 200 Series Methods - Quality Control Batch 1804705 - EPA 200 Series
Blank (1804705-BLK1) Prepared & Analyzed: 06/08/18
Aluminum ND 50 µg/L
Barium ND 100 "
Boron ND 100 "
Beryllium ND 1.0 "
Chromium ND 10 "
Copper ND 50 "
Iron ND 100 "
Manganese ND 20 "
Zinc ND 50 "
LCS (1804705-BS1) Prepared & Analyzed: 06/08/18
Aluminum 4870 50 5000 µg/L 97 85-115
Barium 1060 100 1000 " 106 85-115
Boron 1020 100 1000 " 102 85-115
Beryllium 1160 1.0 1000 " 116 85-115 QM-1
Chromium 1150 10 1000 " 115 85-115
Copper 1150 50 1000 " 115 85-115
Iron 1100 100 1000 " 110 85-115
Manganese 1070 20 1000 " 107 85-115
Zinc 1100 50 1000 " 110 85-115
Matrix Spike (1804705-MS1) Source: 18F0273-01 Prepared & Analyzed: 06/08/18 Aluminum 5800 50 5000 828 µg/L 99 70-130
Barium 1140 100 1000 80.3 " 106 70-130
Boron 1690 100 1000 661 " 103 70-130
Beryllium 1150 1.0 1000 " ND 115 70-130
Chromium 1120 10 1000 " ND 112 70-130
Copper 1090 50 1000 " ND 109 70-130
Iron 2260 100 1000 976 " 129 70-130
Manganese 1040 20 1000 10.4 " 103 70-130
Zinc 1090 50 1000 " ND 109 70-130
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Drinking Water) by EPA 200 Series Methods - Quality Control Batch 1804705 - EPA 200 Series
Matrix Spike (1804705-MS2) Source: 18F0273-01 Prepared & Analyzed: 06/08/18 Aluminum 4890 50 5000 828 µg/L 81 70-130
Barium 1150 100 1000 80.3 " 107 70-130
Boron 1600 100 1000 661 " 94 70-130
Beryllium 1120 1.0 1000 " ND 112 70-130
Chromium 1080 10 1000 " ND 108 70-130
Copper 1060 50 1000 " ND 106 70-130
Iron 1050 100 1000 976 " 7 70-130 QM-7
Manganese 1020 20 1000 10.4 " 101 70-130
Zinc 1050 50 1000 " ND 105 70-130
Batch 1804759 - EPA 200 Series
Blank (1804759-BLK1) Prepared & Analyzed: 06/11/18
Antimony ND 4.0 µg/L
Arsenic ND 2.0 "
Cadmium ND 1.0 "
Lead ND 5.0 "
Nickel ND 10 "
Selenium ND 5.0 "
Silver ND 10 "
Vanadium ND 3.0 "
Thallium ND 1.0 "
LCS (1804759-BS1) Prepared & Analyzed: 06/11/18
Antimony 102 4.0 100 µg/L 102 85-115
Arsenic 108 2.0 100 " 108 85-115
Cadmium 111 1.0 100 " 111 85-115
Lead 107 5.0 100 " 107 85-115
Nickel 108 10 100 " 108 85-115
Selenium 110 5.0 100 " 110 85-115
Silver 94.3 10 100 " 94 85-115
Vanadium 106 3.0 100 " 106 85-115
Thallium 105 1.0 100 " 105 85-115
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Drinking Water) by EPA 200 Series Methods - Quality Control Batch 1804759 - EPA 200 Series
Matrix Spike (1804759-MS1) Source: 18F0246-01 Prepared & Analyzed: 06/11/18 Antimony 97.8 4.0 100 µg/L ND 98 70-130
Arsenic 1350 2.0 100 1260 " 93 70-130
Cadmium 96.0 1.0 100 " ND 96 70-130
Lead 109 5.0 100 0.450 " 109 70-130
Nickel 82.5 10 100 2.95 " 80 70-130
Selenium 127 5.0 100 3.60 " 123 70-130
Silver 88.1 10 100 8.19 " 80 70-130
Vanadium 112 3.0 100 14.9 " 97 70-130
Thallium 106 1.0 100 0.140 " 106 70-130
Matrix Spike (1804759-MS2) Source: 18F0291-01 Prepared & Analyzed: 06/11/18 Antimony 106 4.0 100 µg/L ND 106 70-130
Arsenic 117 2.0 100 3.66 " 113 70-130
Cadmium 114 1.0 100 " ND 114 70-130
Lead 112 5.0 100 0.300 " 112 70-130
Nickel 101 10 100 0.710 " 100 70-130
Selenium 117 5.0 100 " ND 117 70-130
Silver 88.9 10 100 " ND 89 70-130
Vanadium 104 3.0 100 1.28 " 103 70-130
Thallium 110 1.0 100 0.220 " 110 70-130
Batch 1804802 - EPA 7470A
Blank (1804802-BLK1) Prepared: 06/11/18 Analyzed: 06/13/18 Mercury ND 1.0 µg/L
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Metals (Drinking Water) by EPA 200 Series Methods - Quality Control Batch 1804802 - EPA 7470A
LCS (1804802-BS1) Prepared: 06/11/18 Analyzed: 06/13/18 Mercury 4.59 1.0 5.00 µg/L 92 85-115
Matrix Spike (1804802-MS1) Source: 18F0171-01 Prepared: 06/11/18 Analyzed: 06/13/18 Mercury 4.62 1.0 5.00 µg/L ND 92 70-130
Matrix Spike Dup (1804802-MSD1) Source: 18F0171-01 Prepared: 06/11/18 Analyzed: 06/13/18 Mercury 4.71 1.0 5.00 µg/L ND 94 2 70-130 25
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Purgeable Organic Compounds by EPA Method 524.2 - Quality Control Batch 1804837 - EPA 5030 Water MS
Blank (1804837-BLK1) Prepared & Analyzed: 06/11/18
Benzene ND 0.50 µg/L
Carbon tetrachloride ND 0.50 "
Chlorobenzene ND 0.50 "
1,2-Dichlorobenzene ND 0.50 "
1,4-Dichlorobenzene ND 0.50 "
1,1-Dichloroethane ND 0.50 "
1,2-Dichloroethane ND 0.50 "
1,1-Dichloroethene ND 0.50 "
cis-1,2-Dichloroethene ND 0.50 "
trans-1,2-Dichloroethene ND 0.50 "
1,2-Dichloropropane ND 0.50 "
cis-1,3-Dichloropropene ND 0.50 "
trans-1,3-Dichloropropene ND 0.50 "
Ethylbenzene ND 0.50 "
Methyl tert-butyl ether ND 3.0 "
Methylene chloride ND 0.50 "
Styrene ND 0.50 "
1,1,2,2-Tetrachloroethane ND 0.50 "
Tetrachloroethene ND 0.50 "
Toluene ND 0.50 "
1,2,4-Trichlorobenzene ND 0.50 "
1,1,1-Trichloroethane ND 0.50 "
1,1,2-Trichloroethane ND 0.50 "
Trichloroethene ND 0.50 "
Trichlorofluoromethane ND 5.0 "
1,1,2-Trichloro-1,2,2-trifluoroethane (Freon
113)
ND 10 "
Vinyl chloride ND 0.50 "
Xylenes (total) ND 0.50 "
Total Trihalomethanes (THM) ND 0.50 "
Surrogate: 1,2-Dichloroethane-d4 9.61 " 10.0 96 66-135
Surrogate: Toluene-d8 9.54 " 10.0 95 70-130
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Purgeable Organic Compounds by EPA Method 524.2 - Quality Control Batch 1804837 - EPA 5030 Water MS
Blank (1804837-BLK1) Prepared & Analyzed: 06/11/18
Surrogate: 4-Bromofluorobenzene 11.2 " 10.0 112 70-130
LCS (1804837-BS1) Prepared & Analyzed: 06/11/18
Benzene 19.5 0.50 20.0 µg/L 98 70-130
Carbon tetrachloride 19.9 0.50 20.0 " 100 70-130
Chlorobenzene 19.8 0.50 20.0 " 99 70-130
1,2-Dichlorobenzene 22.4 0.50 20.0 " 112 70-130
1,4-Dichlorobenzene 22.8 0.50 20.0 " 114 70-130
1,1-Dichloroethane 18.5 0.50 20.0 " 92 70-130
1,2-Dichloroethane 16.3 0.50 20.0 " 82 70-130
1,1-Dichloroethene 17.7 0.50 20.0 " 89 70-130
cis-1,2-Dichloroethene 20.3 0.50 20.0 " 101 70-130
trans-1,2-Dichloroethene 18.7 0.50 20.0 " 94 70-130
1,2-Dichloropropane 19.3 0.50 20.0 " 96 70-130
cis-1,3-Dichloropropene 21.0 0.50 20.0 " 105 70-130
trans-1,3-Dichloropropene 19.9 0.50 20.0 " 99 70-130
Ethylbenzene 20.1 0.50 20.0 " 101 70-130
Methyl tert-butyl ether 16.8 3.0 20.0 " 84 0-200
Methylene chloride 17.4 0.50 20.0 " 87 70-130
Styrene 21.2 0.50 20.0 " 106 70-130
1,1,2,2-Tetrachloroethane 22.4 0.50 20.0 " 112 70-130
Tetrachloroethene 19.8 0.50 20.0 " 99 70-130
Toluene 20.1 0.50 20.0 " 101 70-130
1,2,4-Trichlorobenzene 22.4 0.50 20.0 " 112 70-130
1,1,1-Trichloroethane 19.7 0.50 20.0 " 98 70-130
1,1,2-Trichloroethane 20.0 0.50 20.0 " 100 70-130
Trichloroethene 19.4 0.50 20.0 " 97 70-130
Trichlorofluoromethane 16.4 5.0 20.0 " 82 70-130
1,1,2-Trichloro-1,2,2-trifluoroethane (Freon
113)
23.1 10 20.0 " 115 0-200
Vinyl chloride 16.7 0.50 20.0 " 84 60-140
Surrogate: 1,2-Dichloroethane-d4 8.20 " 10.0 82 66-135
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Purgeable Organic Compounds by EPA Method 524.2 - Quality Control Batch 1804837 - EPA 5030 Water MS
LCS (1804837-BS1) Prepared & Analyzed: 06/11/18
Surrogate: Toluene-d8 10.1 µg/L 10.0 101 70-130
Surrogate: 4-Bromofluorobenzene 12.2 " 10.0 122 70-130
LCS Dup (1804837-BSD1) Prepared & Analyzed: 06/11/18
Benzene 19.4 0.50 20.0 µg/L 97 0.7 70-130 30
Carbon tetrachloride 21.4 0.50 20.0 " 107 7 70-130 30
Chlorobenzene 19.7 0.50 20.0 " 98 0.6 70-130 30
1,2-Dichlorobenzene 20.6 0.50 20.0 " 103 8 70-130 30
1,4-Dichlorobenzene 21.1 0.50 20.0 " 105 8 70-130 30
1,1-Dichloroethane 18.8 0.50 20.0 " 94 2 70-130 30
1,2-Dichloroethane 17.2 0.50 20.0 " 86 5 70-130 30
1,1-Dichloroethene 18.1 0.50 20.0 " 90 2 70-130 30
cis-1,2-Dichloroethene 20.8 0.50 20.0 " 104 3 70-130 30 trans-1,2-Dichloroethene 19.3 0.50 20.0 " 97 3 70-130 30 1,2-Dichloropropane 19.4 0.50 20.0 " 97 0.7 70-130 30
cis-1,3-Dichloropropene 21.2 0.50 20.0 " 106 1 70-130 30 trans-1,3-Dichloropropene 19.6 0.50 20.0 " 98 1 70-130 30 Ethylbenzene 19.6 0.50 20.0 " 98 3 70-130 30
Methyl tert-butyl ether 18.0 3.0 20.0 " 90 7 0-200 200
Methylene chloride 17.9 0.50 20.0 " 90 3 70-130 30
Styrene 21.0 0.50 20.0 " 105 1 70-130 30
1,1,2,2-Tetrachloroethane 22.9 0.50 20.0 " 114 2 70-130 30 Tetrachloroethene 19.4 0.50 20.0 " 97 2 70-130 30
Toluene 19.8 0.50 20.0 " 99 2 70-130 30
1,2,4-Trichlorobenzene 23.6 0.50 20.0 " 118 5 70-130 30 1,1,1-Trichloroethane 20.7 0.50 20.0 " 103 5 70-130 30
1,1,2-Trichloroethane 20.0 0.50 20.0 " 100 0.3 70-130 30 Trichloroethene 19.2 0.50 20.0 " 96 1 70-130 30
Trichlorofluoromethane 19.1 5.0 20.0 " 96 15 70-130 30
1,1,2-Trichloro-1,2,2-trifluoroethane (Freon
113)
23.3 10 20.0 " 116 0.9 0-200 200
Vinyl chloride 19.2 0.50 20.0 " 96 14 60-140 30
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Result Limit
Reporting
Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte Limit Notes
Purgeable Organic Compounds by EPA Method 524.2 - Quality Control Batch 1804837 - EPA 5030 Water MS
LCS Dup (1804837-BSD1) Prepared & Analyzed: 06/11/18
Surrogate: 1,2-Dichloroethane-d4 8.58 µg/L 10.0 86 66-135 Surrogate: Toluene-d8 9.87 " 10.0 99 70-130
Surrogate: 4-Bromofluorobenzene 10.8 " 10.0 108 70-130
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
Project:
Project Number:
Project Manager:
Kleinfelder (Sacramento)
2882 Prospect Park Dr. suite 200
Riverview MHP
20190044
Joe Zilles
07/20/18 16:43
Rancho Cordova, CA 95742
CLS Work Order #: 18F0272
COC #: 29379
Notes and Definitions
QM-7 The spike recovery was outside acceptance limits for the MS and/or MSD. The batch was accepted based on acceptable LCS/LCSD recovery.
QM-4X The spike recovery was outside of QC acceptance limits for the MS and/or MSD due to analyte concentration at 4 times or greater the spike concentration. The QC batch was accepted based on LCS and/or LCSD recoveries within the acceptance limits.
QM-1 The spike recovery was outside acceptance limits for the LCS or LCSD. The batch was accepted based on acceptable MS/MSD recoveries & RPD's.
HT-F This is a field test method and it is performed in the lab outside holding time.
BT-2 Absent
BT-1 Present
Sample results reported on a dry weight basis
RPD Relative Percent Difference
dry
NR Not Reported
ND Analyte NOT DETECTED at or above the reporting limit (or method detection limit when specified) DET Analyte DETECTED
3249 Fitzgerald Road, Rancho Cordova, CA 95742 | 800.638.7301 | Tel: 916.638.7301 x102 | Fax: 916.638.4510 | www.californialab.com
EMSL Analytical, Inc.
464 McCormick Street San Leandro, CA 94577
Phone/Fax: (510) 895-3675 / (510) 895-3680
http://www.EMSL.com / [email protected]
CALI52
091812011
18F0272
EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Attn:
Proj: 18F0272 - KB-01-264
Phone: (916) 638-7301
Fax: (916) 638-4510
Collected: 06/06/2018
Received: 06/07/2018
Analyzed: 06/20/2018
Mark Smith
California Laboratory Services
3249 Fitzgerald Road
Rancho Cordova, CA 95742
Test Report: Determination of Asbestos Structures >10µm in Drinking Water Performed by the 100.2 Method (EPA 600/R-94/134)
Sample
Filtration
Date/Time
Sample ID
Client / EMSL
ASBESTOS
Confidence
Limits
Analytical Concentration
Sensitivity
Fibers
Detected
Asbestos
Types Area
Analyzed
(mm²)
Effective
Filter
Area
(mm²)
Original
Sample Vol.
Filtered
(ml) MFL (million fibers per liter)
6/7/2018
04:38 PM
KB-01-264 10 1312 0.2440
091812011-0001
ND 0.54 <0.54 0.00 - 2.00 None Detected
Due to excessive particulate the analytical sensitivity of 0.2 MFL as required by the method was not reached.
Test Report: TEM100.2-7.35.11 Printed: 6/20/2018 02:15PM Page 1 of 1 Analyst(s)
Matthew Batongbacal
Any questions please contact Matthew Batongbacal. or Other Approved Signatory Sample collection and containers provided by the client, acceptable bottle blank level is defined as 0.01MFL>10um. ND=None Detected. This report may not be reproduced, except in full, without written permission by EMSL Analytical, Inc. This report relates only to those items tested.Samples received in good condition unless otherwise noted.
Samples analyzed by EMSL Analytical, Inc San Leandro, CA CA ELAP 1620, HI reciprocity, ID CA 01477, WA C884 Rui Cindy Geng (1)
Initial report from: 06/20/2018 14:15:00
OrderID: 091812011
July 6, 2018
CLS Labs - Data Room Lab ID : SP 1807545
3249 Fitzgerald Rd.
Rancho Cordova, CA 95742
Customer : 2-19423
Laboratory Report
This Page is to be Stamped
Introduction: This report package contains total of 4 pages divided into 3 sections:
Case Narrative (2 pages) : An overview of the work performed at FGL.
Sample Results (1 page) : Results for each sample submitted.
Quality Control (1 page) : Supporting Quality Control (QC) results.
Case Narrative
This Case Narrative pertains to the following samples:
Sample Description
Date
Sampled
Date
Received
FGL Lab ID # Matrix
KB-01-264 06/06/2018 06/08/2018 SP 1807545-001 W
Sampling and Receipt Information: All samples were received in acceptable condition and within temperature requirements, unless noted on the Condition Upon Receipt (CUR) form. All samples arrived at 5 °C. All samples were prepared and analyzed within the method specified hold time. All samples were checked for pH if acid or base preservation is required (except for VOAs). For details of sample receipt information, please see the attached Chain of Custody and Condition Upon Receipt Form.
Quality Control: All samples were prepared and analyzed according to the following tables:
Radio QC
900.0 06/15/2018:208552 All analysis quality controls are within established criteria 06/14/2018:206802 All preparation quality controls are within established criteria 903.0 06/18/2018:208673 All analysis quality controls are within established criteria 06/09/2018:206724 All preparation quality controls are within established criteria 908.0 07/06/2018:209675 All analysis quality controls are within established criteria 06/27/2018:207537 All preparation quality controls are within established criteria Ra - 05 07/02/2018:209644 All analysis quality controls are within established criteria 06/23/2018:207001 All preparation quality controls are within established criteria Corporate Offices & Laboratory
853 Corporation Street
Santa Paula, CA 93060
TEL: (805)392-2000
Env FAX: (805)525-4172 / Ag FAX: (805)392-2063
CA ELAP Certification No. 1573
Office & Laboratory
2500 Stagecoach Road
Stockton, CA 95215
TEL: (209)942-0182
FAX: (209)942-0423
CA ELAP Certification No. 1563
Office & Laboratory
563 E. Lindo Avenue
Chico, CA 95926
TEL: (530)343-5818
FAX: (530)343-3807
CA ELAP Certification No. 2670
Office & Laboratory
9415 W. Goshen Avenue
Visalia, CA 93291
TEL: (559)734-9473
FAX: (559)734-8435
CA ELAP Certification No. 2810
Office & Laboratory
3442 Empresa Drive, Suite D
San Luis Obispo, CA 93401
TEL: (805)783-2940
FAX: (805)783-2912
CA ELAP Certification No. 2775
ENVIRONMENTAL AGRICULTURAL