Classification
(Journeyperson)
Basic
Hourly
Rate
Hoursa
Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
Steel form raiser and setter, timberman, retimberman (wood or steel or substitute materials), tugger, cabletender, certified welder, chucktender, powderman-primer house
$47.78 8.0 $78.15 $102.04 $102.04 $125.93
Vibratorman, pavement breaker, bull gang-mucker, trackman, concrete crew including rodding and spreading $47.33 8.0 $77.70 $101.365 $101.365 $125.03 Dumpman (any method), grout crew, reboundman, swamper/brakeman, watchman $46.79 8.0 $77.16 $100.555 $100.555 $123.95
Wages and Total Hourly Rates (including employer payments) – Special Single and Second Shift:
Classification
(Journeyperson)
Basic
Hourly
Rate
Hoursa
Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
Diamond driller, groundman, gunite or shotcrete nozzleman $51.26 8.0 $81.63 $107.26 $107.26 $132.89 Rodman, shaft work and raise (below actual or excavated ground level) $51.03 8.0 $81.40 $106.915 $106.915 $132.43 Bit grinder, blaster, driller, powderman-heading, cherry pickerman-where car is lifted, concrete finisher in tunnel, concrete/screed man, grout pumpman and potman, gunite and shotcrete gunman and potman, headerman, high pressure nozzleman, miner-tunnel, including top and bottom man on shaft and raise work, nipper, nozzleman on slick line, sandblaster-potman (work assignment interchangeable)
$50.78 8.0 $81.15 $106.54 $106.54 $131.93
Steel form raiser and setter, timberman, retimberman (wood or steel or substitute materials), tugger, cabletender, certified welder, chucktender, powderman-primer house
$50.78 8.0 $81.15 $106.54 $106.54 $131.93
Vibratorman, pavement breaker, bull gang-mucker, trackman, concrete crew including rodding and spreading $50.33 8.0 $80.70 $105.865 $105.865 $131.03 Dumpman (any method), grout crew, reboundman, swamper/brakeman, watchman $49.79 8.0 $80.16 $105.055 $105.055 $129.95
399
Determination: NC-23-102-11-2024-2
Employer Payments (All Shifts):
Type of Fund Amount
Health and Welfare $10.60
Pension $14.96
Vacation and Holidayc $3.51
Training $0.98
Other $0.32
When designated by an employer, state licensed blaster receives $1.00 per hour above miner’s rate.
Note:
Rates for tunnel workers working in compressed air as well as their support classifications are available by request. Please contact the Office of the Director - Research Unit at (415) 703-4774.
Recognized holidays:
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Saturdays in the same work week may be worked at straight-time if job is shut down during the normal workweek due to inclement weather. Excludes Alameda, Contra Costa, and San Francisco Counties. b One and one-half (1 ½ ) times the regular straight time hourly rate shall be paid for all work on Saturdays (except make up day) and before a shift begins and after it ends.
c Includes an amount for supplemental dues.
400
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: TUNNEL/UNDERGROUND (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)# Determination:
NC-23-63-1-2024-1C
Issue Date:
August 22, 2024
Expiration date of determination:
June 29, 2025** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.
Localities:
All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.
AREA 1 - Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination)
Wages and Employer Payments (Area 1):
Classification
(Journeyperson)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hoursc
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $62.62 $13.38 $11.28 $6.03 $1.21 $1.60 8 $96.12 $127.43 $158.74 Underground Rate Group 1 $60.15 $13.38 $11.28 $6.03 $1.21 $1.60 8 $93.65 $123.73 $153.80 Underground Rate Group 2 $58.89 $13.38 $11.28 $6.03 $1.21 $1.60 8 $92.39 $121.84 $151.28 Underground Rate Group 3 $57.56 $13.38 $11.28 $6.03 $1.21 $1.60 8 $91.06 $119.84 $148.62 Underground Rate Group 4 $56.42 $13.38 $11.28 $6.03 $1.21 $1.60 8 $89.92 $118.13 $146.34 Underground Rate Group 5 $55.28 $13.38 $11.28 $6.03 $1.21 $1.60 8 $88.78 $116.42 $144.06 Shafts Stopes & Raises Group 1-A $62.72 $13.38 $11.28
401
$6.03 $1.21 $1.60 8 $96.22 $127.58 $158.94
Determination: NC-23-63-1-2024-1C
Classification
(Journeyperson)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hoursc
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Shafts Stopes & Raises Group 1 $60.25 $13.38 $11.28 $6.03 $1.21 $1.60 8 $93.75 $123.88 $154.00 Shafts Stopes & Raises Group 2 $58.99 $13.38 $11.28 $6.03 $1.21 $1.60 8 $92.49 $121.99 $151.48 Shafts Stopes & Raises Group 3 $57.66 $13.38 $11.28 $6.03 $1.21 $1.60 8 $91.16 $119.99 $148.82 Shafts Stopes & Raises Group 4 $56.52 $13.38 $11.28 $6.03 $1.21 $1.60 8 $90.02 $118.28 $146.54 Shafts Stopes & Raises Group 5 $55.38 $13.38 $11.28 $6.03 $1.21 $1.60 8 $88.88 $116.57 $144.26 AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).
Wages and Employer Payments (Area 2):
Classification
(Journeyperson)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hoursc
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $64.62 $13.38 $11.28 $6.03 $1.21 $1.60 8 $98.12 $130.43 $162.74 Underground Rate Group 1 $62.15 $13.38 $11.28 $6.03 $1.21 $1.60 8 $95.65 $126.73 $157.80 Underground Rate Group 2 $60.89 $13.38 $11.28 $6.03 $1.21 $1.60 8 $94.39 $124.84 $155.28 Underground Rate Group 3 $59.56 $13.38 $11.28 $6.03 $1.21 $1.60 8 $93.06 $122.84 $152.62 Underground Rate Group 4 $58.42 $13.38 $11.28 $6.03 $1.21 $1.60 8 $91.92 $121.13 $150.34 Underground Rate Group 5 $57.28 $13.38 $11.28 $6.03 $1.21 $1.60 8 $90.78 $119.42 $148.06 Shafts Stopes & Raises Group 1-A $64.72 $13.38 $11.28 $6.03 $1.21 $1.60 8 $98.22 $130.58 $162.94 Shafts Stopes & Raises Group 1 $62.25 $13.38 $11.28 $6.03 $1.21 $1.60 8 $95.75 $126.88 $158.00 Shafts Stopes & Raises Group 2 $60.99 $13.38 $11.28 $6.03 $1.21 $1.60 8 $94.49 $124.99 $155.48 Shafts Stopes & Raises Group 3 $59.66 $13.38 $11.28 $6.03 $1.21 $1.60 8 $93.16 $122.99 $152.82 Shafts Stopes & Raises Group 4 $58.52 $13.38 $11.28 $6.03 $1.21 $1.60 8 $92.02 $121.28 $150.54 Shafts Stopes & Raises Group 5 $57.38 $13.38 $11.28 $6.03 $1.21 $1.60 8 $90.88 $119.57 $148.26 402
Determination: NC-23-63-1-2024-1C
CLASSIFICATIONS
GROUP 1-A
Tunnel Bore Machine Operator - 20 feet in diameter or more GROUP 1
Heading Shield Operator
Heavy Duty Repairman/Welder
Mucking Machine
Raised Bore Operator
Tunnel Mole Bore Operator
Tunnel Boring Machine Operator 10 ft up to 20 ft
GROUP 2
Combination Slusher and Motor Operator
Concrete Pump or Pumpcrete Guns
Power Jumbo Operator
GROUP 3
Drill Doctor
Mine or Shaft Hoist
GROUP 4
Combination Slurry Mixer Cleaner
Grouting Machine Operator
Motorman
GROUP 5
Bit Sharpener
Brakeman
Combination Mixer and Compressor (Gunite)
Compressor Operator
Assistant to Engineer
Pump Operator
Slusher Operator
403
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: TUNNEL/UNDERGROUND (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK# (SPECIAL SINGLE AND SECOND SHIFT)
Determination:
NC-23-63-1-2024-1C
Issue Date:
August 22, 2024
Expiration date of determination:
June 29, 2025** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.
Localities:
All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.
AREA 1 - Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination)
Wages and Employer Payments (Area 1):
Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $68.62 $13.38 $11.28 $6.03 $1.21 $1.60 8 $102.12 $136.43 $170.74 Underground Rate Group 1 $66.15 $13.38 $11.28 $6.03 $1.21 $1.60 8 $99.65 $132.73 $165.80 Underground Rate Group 2 $64.89 $13.38 $11.28 $6.03 $1.21 $1.60 8 $98.39 $130.84 $163.28 Underground Rate Group 3 $63.56 $13.38 $11.28 $6.03 $1.21 $1.60 8 $97.06 $128.84 $160.62 Underground Rate Group 4 $62.42 $13.38 $11.28 $6.03 $1.21 $1.60 8 $95.92 $127.13 $158.34 Underground Rate Group 5 $61.28 $13.38 $11.28 $6.03 $1.21 $1.60 8 $94.78 $125.42 $156.06 404
Determination: NC-23-63-1-2024-1C
Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)
d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Shafts Stopes & Raises Group 1-A $68.72 $13.38 $11.28 $6.03 $1.21 $1.60 8 $102.22 $136.58 $170.94 Shafts Stopes & Raises Group 1 $66.25 $13.38 $11.28 $6.03 $1.21 $1.60 8 $99.75 $132.88 $166.00 Shafts Stopes & Raises Group 2 $64.99 $13.38 $11.28 $6.03 $1.21 $1.60 8 $98.49 $130.99 $163.48 Shafts Stopes & Raises Group 3 $63.66 $13.38 $11.28 $6.03 $1.21 $1.60 8 $97.16 $128.99 $160.82 Shafts Stopes & Raises Group 4 $62.52 $13.38 $11.28 $6.03 $1.21 $1.60 8 $96.02 $127.28 $158.54 Shafts Stopes & Raises Group 5 $61.38 $13.38 $11.28 $6.03 $1.21 $1.60 8 $94.88 $125.57 $156.26 AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination) Wages and Employer Payments (Area 2):
Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly
Rate (1½
x)
d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $70.62 $13.38 $11.28 $6.03 $1.21 $1.60 8 $104.12 $139.43 $174.74 Underground Rate Group 1 $68.15 $13.38 $11.28 $6.03 $1.21 $1.60 8 $101.65 $135.73 $169.80 Underground Rate Group 2 $66.89 $13.38 $11.28 $6.03 $1.21 $1.60 8 $100.39 $133.84 $167.28 Underground Rate Group 3 $65.56 $13.38 $11.28 $6.03 $1.21 $1.60 8 $99.06 $131.84 $164.62 Underground Rate Group 4 $64.42 $13.38 $11.28 $6.03 $1.21 $1.60 8 $97.92 $130.13 $162.34 Underground Rate Group 5 $63.28 $13.38 $11.28 $6.03 $1.21 $1.60 8 $96.78 $128.42 $160.06 Shafts Stopes & Raises Group 1-A $70.72 $13.38 $11.28 $6.03 $1.21 $1.60 8 $104.22 $139.58 $174.94 Shafts Stopes & Raises Group 1 $68.25 $13.38 $11.28 $6.03 $1.21 $1.60 8 $101.75 $135.88 $170.00 Shafts Stopes & Raises Group 2 $66.99 $13.38 $11.28 $6.03 $1.21 $1.60 8 $100.49 $133.99 $167.48 Shafts Stopes & Raises Group 3 $65.66 $13.38 $11.28 $6.03 $1.21 $1.60 8 $99.16 $131.99 $164.82 Shafts Stopes & Raises Group 4 $64.52 $13.38 $11.28 $6.03 $1.21 $1.60 8 $98.02 $130.28 $162.54 Shafts Stopes & Raises Group 5 $63.38 $13.38 $11.28 $6.03 $1.21 $1.60 8 $96.88 $128.57 $160.26 405
Determination: NC-23-63-1-2024-1C
Recognized holidays:
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For classifications within each group, see page 3. b Includes an amount for supplemental dues.
c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. d Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather. 406
DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT
1010 10TH Street, Suite 3400, Modesto, CA 95354
Planning Phone: (209) 525-6330 Fax: (209) 525-5911
Building Phone: (209) 525-6557 Fax: (209) 525-7759
______________________________________________________________________________________________ U.S. Department of Housing and
Urban Development (HUD)
Supplemental General Conditions
Documents Packet
All Bidders Must Review This Document and Complete All
Applicable Pages and Submit Said Pages At The Time Of The Bid Opening
STRIVING TOGETHER TO BE THE BEST!
407
2 Table of Contents
Instructions 3
Stanislaus County Public Works Projects 3
City Infrastructure Projects 3
Supplemental Documentation Checklist 4
Notice of Required Documentation to Contractors 5
Contract Provisions 5
Procurement 5
Build America Buy America (BABA) 5
Compliance with Equal Employment Opportunity (EEO) 6
Small Business, Minority Business, Women’s Business Enterprises, Veteran-Owned Businesses, and Labor Surplus Area Firms 8
Compliance with the Anti-Kickback Act 8
Compliance with Davis-Bacon Act 8
Compliance with Section 103 & 107 of the Contract Work Hours & Safety Standards Act 9 Access to Records 9
Records Retention 10
Compliance with Clean Air & Water Acts 10
Energy Conservation (24 CFR 85.36 (i) (13)) 10
Federal Labor Standards Provisions 10
Compliance in the Provision of Training, Employment, and Business Opportunities 11 Title VI Civil Rights Act of 1964 11
Title VIII Civil Rights Act of 1968 12
Debarment and Suspension 12
Byrd Anti-Lobbying Amendment 12
Procurement of Recovered Materials 13
Prohibition on Certain Telecommunications and Video Surveillance Equipment or Services 13 Remedies for Breach 13
Termination for Convenience or Cause 14
Rights to Inventions Made Under a Contract or Agreement 14 Forms, Reports and Policies 15
Section 3 Requirements 15
Required Section 3 Forms, Reports & Section 3 Plan 15
Small and Disadvantaged Business Enterprise (SDBE) Information 16 What is DBE? 16
Disadvantaged Business Enterprise Participation 16
Wage Sheet & Classification Review 17
Review of Project Wage Sheet 17
Additional Classifications 17
Minimum Criteria for Additional Classification Requests 17 Wage Payment Compliance 17
Payment of Fringe Benefits 18
Failure to Pay Prevailing Wages 18
Failure to Pay Overtime Compensation 18
Debarment Proceeding 18
Required Form Exhibits & LMI:
Exhibit A: BABA Covered Materials & Manufactured Goods Acknowledgement Exhibit B: BABA Covered Materials & Manufactured Goods List Exhibit C: Disadvantaged Business Enterprise Participation Exhibit D: Stanislaus County Disadvantaged Business Enterprise Participation Certification Exhibit E: Federal Labor Standards Provisions
Exhibit F: Compliance in the Provision of Training, Employment, and Business Opportunities – Section 3 Exhibit G: Section 3- Outreach Efforts
Exhibit H: Certification Regarding Lobbying
Exhibit I: Contractors/Subcontractors Certification and Wage Rate Sheet 408
3 v.2.2024
INSTRUCTIONS
The Prime Contractor and all subcontractors are required to adhere to the requirements outlined in this documentation. The distinction between County Public Works and City Infrastructure projects should be distinguished by the appropriate check box, which designates the project type and ownership.
Stanislaus County Public Works Projects or City Infrastructure Projects ☐ As the Prime Contractor and any subcontractor submitting this document, on behalf of Stanislaus County Public Works, I, the undersigned, acknowledge that all documentation pertaining to the following project is true and correct to the best of my knowledge.
Name of
Representative
Submitting
Document:
Title of
Representative:
Project Name:
Project
Location:
Name of
Contractor:
Name of
Subcontractor:
Funding Type:
☐ As the Prime Contractor and any subcontractor submitting this document, on behalf of the City of __________________, I, the undersigned, acknowledge that all documentation pertaining to the following project is true and correct to the best of my knowledge.
Name of
Representative
Submitting
Document:
Title of
Representative:
Project Name:
Project
Location:
Name of
Contractor:
Name of
Subcontractor:
Funding Type:
409
4 SUPPLEMENTAL DOCUMENTATION CHECKLIST
This checklist has been placed in this supplemental packet for your organization and/or agency use and to determine compliance with the required documentation that is applicable to the General Conditions of U.S. Department of Housing and Urban Development (HUD) funded projects. As a requirement, all documents that are attached as an exhibit to this Supplemental General Conditions Documents Packet are listed below for your tracking convenience.
Exhibit Document Title Completed Date Designee Signature A
BABA Covered Materials &
Manufactured Goods
Acknowledgement
☐
B
BABA Covered Materials &
Manufactured Goods List ☐
C
Disadvantaged Business
Enterprise Participation ☐
D
Stanislaus County
Disadvantaged Business
Enterprise Participation
Certification
☐
E
Federal Labor Standards
Provisions ☐
F
Compliance in the Provision of
Training, Employment, and
Business Opportunities –
Section 3
☐
G Section 3- Outreach Efforts ☐
H
Certification Regarding
Lobbying ☐
I
Contractors/Subcontractors
Certification and Wage
Rate Sheet
☐
410
5 v.2.2024
NOTICE OF REQUIRED DOCUMENTATION TO
CONTRACTORS
CONTRACT PROVISIONS
(Required for all City Projects and/or County Public Works Project bidding and contract documents for HUD-funded projects)
Contractor is required to comply with the following provisions:
A. Procurement
Contractor must comply with 2 CFR Sections 200.317-200.327 when purchasing materials, products or services with federal funds.
B. Build America, Buy America (BABA) Act Requirements
The Build America, Buy America (BABA) Act, 41 USC § 8301, was enacted in the Infrastructure Investment and Jobs Act on November 15, 2021. The BABA Act requires that products purchased in connection with infrastructure projects funded by Federal financial assistance (FFA) programs must be produced in the United States (U.S.). This requirement is known as the “Buy America Preference (BAP)” (or “domestic procurement requirement”).
The prime contractor and all subcontractors (all tiers) must comply with the requirements of the BABA Act, 41 USC 8301, and all applicable rules and notices, as may be amended, as applicable to all HUD-funded infrastructure projects. Pursuant to the U.S. Department of Housing and Urban Development’s (HUD’s) notice, “Public Interest Phased Implementation Waiver for FY2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance” (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.
All iron, steel, manufactured products, and construction materials used in federally funded infrastructure projects listed in the table below must be produced in the U.S. unless the project or purchase qualifies for a waiver or exemption. The contractor must maintain records that verify compliance with the BAP requirement for iron and steel materials and provide them to the City and County upon request throughout the project, and all final documentation must be submitted within 60 days of the Notice of Completion of the project. Infrastructure projects that are awarded CDBG funds in or after 2023 are subject to the BAP requirement. Additional information on which the construction work is covered by BAP requirements and compliance can be found as Exhibit A (BABA Covered Materials & Manufactured Goods Acknowledgement) and Exhibit B (BABA Covered Materials & Manufactured Goods List).
The contractor must maintain records that verify compliance with the BAP requirements and provide them to the City and/or County upon request throughout the project, and all final documentation must be submitted within 60 days of the Notice of Completion of the project.
Infrastructure projects that are awarded CDBG funds in or after 2023 are subject to the BAP requirement.
411
6 Additional information and resources are provided at the following HUD BABA CPD Notice:
https://www.hud.gov/sites/dfiles/OCHCO/documents/cpd-25-01.pdf. Per 2 CFR Section 200.322, the Contractor should, to the greatest extent practicable and consistent with law, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products).
C. Compliance with Equal Employment Opportunity provisions (2 CFR Part 200 App. II(C); 41 CFR 60-1.4(b)).
Federal regulations mandate including the following language in non-exempt federally assisted construction contracts. Note, however, that Executive Order 11246 was rescinded by Executive Order 14173 on January 21, 2025.
During the performance of this contract, the Contractor agrees as follows:
1. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
The Contractor will take affirmative action to ensure that applicants are employed, and the employees are treated during employment, without regard to their race, color, religion, sex, are sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
3. The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee’s essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the contractor’s legal duty to furnish information.
4. The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representative of the Contractor's commitments under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
412
7 v.2.2024
5. The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations and relevant orders of the Secretary of Labor.
6. The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations and orders.
7. In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by the rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
8. The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as may be directed by the Secretary of Labor as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event the contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction, the contractor may request the United States to enter into such litigation to protect the interests of the United States.
The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. 413
8 The Contractor also consents to compliance with all executive orders listed in 24 CFR Part 570.607.
D. Small Business, Minority Business, Women’s Business Enterprises, Veteran-Owned Businesses, and Labor Surplus Area Firms (2 CFR Section 200.321).
The contractor shall carry out applicable requirements of 2 CFR Section 200.321 in the award and administration of HUD-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate. Contractor must, at a minimum, take the following steps to consider the use of small businesses, minority businesses, women's business enterprises, veteran-owned businesses, and labor surplus area firms:
1. Placing these qualified businesses on solicitation lists;
2. Assuring that these businesses are solicited whenever they are potential sources;
3. Dividing procurement transactions into separate procurements when economically feasible to permit maximum participation by these businesses;
4. Establishing delivery schedules that encourage participation by these businesses; and
5. Utilizing such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce.
Please Note: Utilize Exhibit C (Disadvantaged Business Enterprise Participation) and Exhibit D (Stanislaus County Disadvantaged Business Enterprise Participation Certification) to document participation.
E. Compliance with Anti-Kickback Act (2 CFR Part 200 App. II(D)) In carrying out this agreement, the Contractor hereby agrees to adhere to the mandate dictated by the Copeland "Anti-Kickback" Act (18 U.S.C. 874; 40 U.S.C. 3145), as supplemented by 29 CFR Part 3, which provides that each Contractor or subrecipient shall be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of work, to give up any part of the compensation to which he is otherwise entitled. A breach of these provisions may be grounds for termination of the Agreement, and for debarment as a contractor and subcontractor as provided in 29 C.F.R. § 5.12.
F. Compliance with Davis Bacon Act (40 U.S.C. 3141-3144, 3146-3148) (2 CFR Part 200 App. II(D))
In carrying out this agreement, the Contractor hereby agrees to comply with the requirements of the Davis-Bacon Act, as amended (40 U.S.C. 3141-3144, 3146-3148) and as supplemented in the US Department of Labor regulations 29 CFR Part 5, with respect to construction contracts in excess of $2,000 awarded by non-Federal entities. In accordance with the statute, Contractor must pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, Contractor must pay wages not less than once a week. The decision to award this Agreement is expressly conditioned upon the acceptance of the wage determination. The County will report all suspected or reported violations to the Federal awarding agency. 414
9 v.2.2024
G. Compliance with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (2 CFR Part 200 App. II(E), 24 CFR 570.603)
1. In general. In carrying out this agreement, the Contractor hereby agrees to comply with the requirements of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708) as supplemented in US Department of Labor regulations 29 CFR Part 5, with respect to construction contracts in excess of $100,000 awarded by non-Federal entities that involve the employment of mechanics or laborers.
2. Overtime requirements. Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. Additionally, the regulations in 24 CFR Part 70 apply to the use of volunteers.
3. Violation; lability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (2) of this section, the Contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, Contractor and subcontractor(s) shall be liable to the United States for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (a) of this section, in the sum of $32 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (a) of this section.
4. Withholding for unpaid wages and liquidated damages. The County shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b) of this section.
5. Subcontracts. The Contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs (a) through (d) of this section and also a clause requiring the subcontractors to include these clauses in any lower-tier subcontracts. The Contractor shall be responsible for compliance by any subcontractor or lower-tier subcontractor with the clauses set forth in paragraphs (a) through (d) of this section.
H. Access to Records (2 CFR 200.337)
The Contractor shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to this contract and 415
10 such other records as may be deemed necessary by the grantee to assure proper accounting for all funds applicable to this contract. The County, City, U.S. Department of Housing and Urban Development, the Comptroller General of the United States, or any of their duly authorized representatives, shall have access to any records of the contractor pertinent to this contract, for the purpose of performing audits executing site visits, or for any other official use. The Contractor must take measures to protect the names of victims of a crime when access to the victim's name is necessary.
I. Records Retention (24 CFR 570.502(a)(7); 2 CFR 200.334)) Notwithstanding the below exceptions, the Contractor must retain all Federal award records for three years from the date of submission of their final financial report. For awards that are renewed quarterly or annually, the Contractor must retain records for three years from the date of submission of their quarterly or annual financial report, respectively. Records to be retained include but are not limited to, financial records, supporting documentation, and statistical records.
The following exceptions apply:
• The retention period for individual CDBG activities shall be the longer of 5 years after the expiration or termination of the subrecipient agreement under 24 CFR Section 570.503, or 5 years after the submission of the annual performance and evaluation report, as prescribed in 24 CFR Section 91.520, in which the specific activity is reported on for the final time;
• Records for individual activities subject to the reversion of assets provisions at 24 CFR Section 570.503(b)(7) or change of use provisions at 24 CFR Part 570.505 must be maintained for as long as those provisions continue to apply to the activity; and • Records for individual activities for which there are outstanding loan balances, other receivables, or contingent liabilities must be retained until such receivables or liabilities have been satisfied.
J. Compliance with Clean Air and Water Acts (2 CFR Part 200 App. II(G) (12)) In carrying out this agreement, the contractor agrees to comply with all applicable standards, orders, and regulations issued pursuant to the Federal Clean Air Act (42 USC 7401 et seq.) and the Federal Water Pollution Control Act (33 USC 1251 et seq.), as amended, for contracts and subgrants in excess of $150,000. Violations must be reported to the County, the Federal awarding agency, and the Regional Office of the EPA. Contractor will include these requirements in each subcontract exceeding $150,000 that receives any federal funding.
K. Energy Conservation (24 CFR 85.36 (i) (13))
In carrying out this agreement, the contractor agrees to comply with the requirements of mandatory standards and policies relating to energy efficiency which are contained in the State of California’s energy conservation plan issued in compliance with the federal Energy Policy and Conservation Act (PL 94-163, 89 Statutes 871).
L. Federal Labor Standards Provisions: (Applicable to construction contracts in excess of $2,000 or residential rehabilitation contracts Involving more than eight units)
The Project or program to which the construction work covered by this Contract pertains is being assisted by the United States of America and the Federal Labor Standards Provisions 416
11 v.2.2024
as set forth on Exhibit E are included in this Contract pursuant to the provisions applicable to such Federal assistance. These provisions must be complied with or sanctions will be instituted.
The Contractor or subcontractor will insert in any subcontracts the clauses contained in subparagraphs 1 through 11 of paragraph A of the Federal Labor Standards Provisions (Exhibit E) and such other clauses as HUD or its designee may by appropriate instructions require, and a copy of the applicable prevailing wage decision, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in paragraph A of the Federal Labor Standards Provisions (Exhibit E).
M. Compliance in the Provision of Training, Employment, and Business Opportunities – Section 3
The work to be performed under this contract is on a project assisted under a program providing direct federal financial assistance from the Department of Housing and Urban Development and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 USC, 1701u. Section 3 requires that to the greatest extent feasible, opportunities for training and employment be given to lower income residents of the area of the Section 3 covered project, and contracts for work in connection with the project be awarded to business concerns which are located in or owned in substantial part by persons residing in the area of the Section 3 covered project.
Please Note: Exhibit F and Exhibit G must be completed to comply with the above referenced requirements.
N. Title VI Civil Rights Act of 1964:
During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the “contractor”), agrees as follows:
1. The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, sex or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 1.4 of the HUD Regulations, including employment practices.
2. In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential sub-contractor or supplier shall be notified by the contractor of the contractor’s obligations under this contract and the regulations relative to nondiscrimination on the grounds of race, color, sex, or national origin.
3. The contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, their sources of information and its facilities as may be determined by the Stanislaus County (awarding agency)* or the United States Department of Housing and Urban Development to be pertinent to ascertain compliance with such regulations, orders and instructions. Where 417
12 any information is required or a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to Stanislaus County (awarding agency) or the United States Department of Housing and Urban Development, as appropriate, and shall set forth what efforts it has made to obtain the information.
4. In the event of the contractor’s noncompliance with the nondiscrimination provisions of this contract, Stanislaus County (awarding agency) or the United States Department of Housing and Urban Development shall impose such contract sanctions as it may determine to be appropriate, including, but not limited to:
a) Withholding of payments to the contractor under the contract until the contractor complies; and/or,
b) Cancellation, termination or suspension of the contract, in whole or in part.
5. The contractor shall include the provisions of paragraph (P1) through (P5) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as Stanislaus County (awarding agency) or the United States Department of Housing and Urban Development may direct as a means of enforcing such provisions including sanctions for noncompliance; provided, however, that in the event the contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Stanislaus County (awarding agency) to enter into such litigation to protect the interests the Stanislaus County (awarding agency), and, in addition, the contractor may request the United States Department of Housing and Urban Development to enter into such litigation to protect the interests of the United States.
* Stanislaus Urban County Awarding Agencies: Stanislaus County, City of Ceres, City of Hughson, City of Newman, City of Oakdale, City of Patterson, City of Riverbank, and City of Waterford.
O. Title VIII Civil Rights Acts of 1968 (as applicable):
The contractor shall comply with Title VIII Civil Rights Acts of 1968 which prohibits discrimination in the sale or rental of dwellings (as defined), discrimination in the financing or housing, blockbusting, and discriminatory advertising; and makes it unlawful to deny any person access to, or membership or participation in, any multiple listing service or real estate broker organization for discriminatory reasons.
P. Debarment and Suspension (2 CFR Part 200 App. II(H)) A contract award (see 2 CFR 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR Part 1986 Comp., p. 189) and 12689 (3 CFR Part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. Contractor certifies that, to the best of its knowledge and belief, it and its principals are not presently debarred, suspended, proposed for debarment, declared 418
13 v.2.2024
ineligible, or voluntarily excluded from covered transactions by any Federal department or agency.
The Contractor agrees to include these regulations in any covered subcontracts.
Q. Byrd Anti-Lobbying Amendment (2 CFR Part 200 App. II(I)) Contractors that apply or bid for an award exceeding $100,000 must file the required certification under 31 U.S.C. 1352. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.
To meet this certification requirement, the Contractor must sign the Certification Regarding Lobbying as Exhibit H.
R. Procurement of Recovered Materials (2 CFR Part 200 App. II(J); 2 CFR 200.323)
The Contractor must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976, as amended, 42 U.S.C. 6962. The requirements of Section 6002 include procuring only items designated in the guidelines of the Environmental Protection Agency (EPA) at 40 CFR Part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.
The Contractor must, to the greatest extent practicable and consistent with law, purchase, acquire, or use products and services that can be reused, refurbished, or recycled; contain recycled content, are biobased, or are energy and water-efficient; and are sustainable. This may include purchasing compostable items and other products and services that reduce the use of single-use plastic products. See Executive Order 14057, section 101, Policy.
S. Prohibition on certain telecommunications and video surveillance equipment or services. (2 CFR Part 200 App. II(K); 2 CFR 200.216) The Contractor must comply with the prohibition on certain telecommunications and video surveillance equipment or services stated in 2 CFR Part 200.216.
T. Remedies for Breach. (2 CFR Part 200 App. II(A))
If the value of this Agreement is more than $250,000 (the Simplified Acquisition Threshold amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition 419
14 Regulations Council as authorized by 41 U.S.C. section 1908), the following provision applies:
Remedies for Breach. In addition to all other remedies included in this Agreement, Contractor shall, at a minimum, be liable to the County for all foreseeable damages it incurs as a result of Contractor violation or breach of the terms of this Agreement. This includes without limitation any costs incurred to remediate defects in Contractor’s services and/or the additional expenses to complete Contractor’s services beyond the amounts agreed to in this Agreement, after Contractor has had a reasonable opportunity to remediate and/or complete its services as otherwise set for in this Agreement. All remedies provided for in this Agreement may be exercised individually or in combination with any other remedy available hereunder or under applicable laws, rules, and regulations. The exercise of any remedy shall not preclude or in any way be deemed to waive any other remedy.
U. Termination for Convenience or Cause. (2 CFR Part 200 App. II(B)) If the value of this Agreement is more than $10,000, the following provisions apply:
Termination for Convenience. The County shall have the option, in its sole discretion, to terminate this Agreement at any time for convenience and without cause. The County shall exercise this option by giving Contractor written notice of termination. The notice shall specify the date on which termination shall become effective. The County will pay Contractor for satisfactory Work rendered through the date of termination. In no event shall the County be liable for costs incurred by Contractor or any of its subcontractors after the termination date specified by the County, except for those costs reasonably necessary to effectuate demobilization or transition from the work. Final payment shall not be made to Contractor until Contractor closes out the Work.
Termination for Cause. On and after any event of default by Contractor, the County may immediately terminate this Agreement for cause. The County shall exercise this option by giving Contractor written notice of termination, and such termination shall take effect immediately, and the County will not be liable for costs incurred by Contractor or any of its subcontractors after that time. The County shall have the right to offset from any amounts due to Contractor under this Agreement or any other contract between the County and Contractor all damages, losses, costs or expenses incurred by the County as a result of such event of default and any liquidated damages due from Contractor pursuant to the terms of this Agreement. The County will pay Contractor for satisfactory work rendered through the date of termination, less any such offset.
V. Rights to Inventions Made Under a Contract or Agreement. (2 CFR Part 200 App. II(F))
If the Federal award meets the definition of “funding agreement” under 37 CFR § 401.2(a) and the County, Contractor, or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.
420
15 v.2.2024
NOTE: The above contract provisions are required by 2 CFR Part 200 and 24 CFR Section 570.502. Contractor assumes responsibility for complying with provisions required by those Parts not explicitly stated here.
FORMS, REPORTS, AND POLICY
Due to federal funding, this project has reporting requirements under Section 3 of the U.S. Department Housing and Urban Development Act of 1968 [12 U.S.C. 1701u and 24 CFR Part 75], which provides preference to low-to very low-income residents of the local community (regardless of race or gender), and the businesses that substantially employ these individuals, for new employment, training and contracting opportunities.
Required Section 3 Forms, Reports and Section 3 Plan
A Section 3 Plan Form and all applicable Section 3 requirements must be completed by bidders or applicants seeking funding for a Section 3 covered project. The Section 3 Plan and each applicable form provided outlined in Exhibit F must be submitted with the project bid or grant application.
Recordkeeping and Reporting Obligations
1. The Contractor must follow reporting requirements as established in 24 CFR Part
75.25 and recordkeeping requirements as established in 24 CFR Part 75.31.
Please Note: Please reference Exhibits F and G for information regarding the Section 3 requirements.
***This space intentionally left blank.***
421
16 Small and Disadvantaged Business
Enterprise (SDBE) Information
WHAT IS DBE?
Under the Women’s Business Enterprise and Minority Business Enterprise – Executive Orders 11625, 12138 and 12432, these regulations were established as a national priority.
DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION
If the contractor is unable to find qualified Minority Business Enterprises, Women Business Enterprises (MBEs/WBEs), or other relevant Enterprises (Small Businesses, Labor Surplus Area firms, or VeteranOwned Businesses) in the performance of the contract, it shall document the efforts it made to do so.
Documentation shall be retained in the contractor’s files for review by the County.
NOTE: Exhibits C and D must be signed by the person who will sign or has signed the Bid Form.
These forms are a listing of subcontractors that are planned to be a part of the project. If those subcontractors are unknown or none apply, the forms must still be completed. These forms will become a part of the contract documents.
***This space intentionally left blank.***
422
17 WAGE SHEET AND CLASSIFICATION REVIEW
REVIEW OF PROJECT WAGE SHEET
Important Note: Prior to the start of construction, all contractors are required to submit a Project Wage Sheet. This sheet will list all work classifications that the contractor will utilize to perform work under the contract. The form will also designate if the prevailing rate is a federal or state rate, list the basic hourly rate with the fringe benefit rate and the total of both. The Project Wage Sheet must be reviewed and approved by the project engineer with respect to the work classifications to be used for the construction phase of the project. Also, the Project Wage Sheet must be reviewed and approved by County staff with respect to the wage rates and fringe benefits rates that are to be paid for each work classification.
Please Note: Exhibit I must be completed by all contractors and subcontractors.
ADDITIONAL CLASSIFICATIONS
Any class of laborers or mechanics not listed in the initial wage determination shall be additionally classified in conformance with the wage determination. If additional classifications under the federal wage determinations are required, the Labor Compliance Officer will submit a "Report of
Additional Classifications and Rate" form, located online at:
(https://www.hud.gov/sites/dfiles/OCHCO/documents/4230AInstructions.pdf).
The County will forward the request to the HUD Area Office for submission and approval by the United States Department of Labor. A report on additional classification actions must be approved, modified or disapproved by the United States Department of Labor's Administrator of the Wage and Hour Division, Employment Standards Administration, within 30 days of receipt.
MINIMUM CRITERIA FOR ADDITIONAL CLASSIFICATION REQUESTS Additional classification will be approved only when the following criteria have been met:
a. The work to be performed by the classification requested is not performed by classification in the wage determination;
b. The classification is utilized in the area by the construction industry; and c. The proposed wage rate, including any bona fide fringe benefits, that has a reasonable relationship to the wage rates contained in the wage determination.
WAGE PAYMENT COMPLIANCE
Payroll records shall contain the employee’s full name and identifying number (last four digits of the social security number). The payroll records must also reflect correct classifications, hourly rates of wages paid, daily and weekly number of hours worked, bona fide plans or programs for providing fringe benefits, written evidence of registered or certified apprentice or trainee programs, registration of apprentices or trainees and ratios, and wage rates prescribed in these programs.
423
Signed weekly certified payrolls must be submitted for each week in which any contract work is performed.
The primary contractor is responsible for the submission of copies of payrolls by all subcontractors. Each payroll must be accompanied by a Statement of Compliance (with DavisBacon and Copeland Anti-Kickback Act provisions) signed by the contractor or subcontractor. If the signatory on the Statement of Compliance is not an officer of the contractor’s or subcontractor’s company, the chief executive officer must prepare a letter on company letterhead assigning signatory authority to another individual, such as a payroll officer, to sign on his/her behalf.
PAYMENT OF FRINGE BENEFITS
Whenever the minimum wage rates prescribed in the contract for a class of laborers or mechanics includes a fringe benefit that is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent.
Any payment of fringe benefits other than cash payment must be verified by the agency which received the payment. The contract file must contain a listing provided by the bona fide fringe benefit plan for each employee, verifying the payment made.
FAILURE TO PAY PREVAILING WAGES
In the event of a contractor's or subcontractor's failure to pay all or part of the wages required by the contract to any laborer or mechanic, including any apprentice or trainee, employed or working on the site of work or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project, the Grantee may after written notice to the contractor, sponsor, applicant or owner, take such action as may be necessary to cause the suspension of any further payment, advance or guarantee of funds until such violations have ceased.
FAILURE TO PAY OVERTIME COMPENSATION
In the event of violation of the overtime provision of the Contract Work Hours and Safety Standards Act, the contractor and any subcontractor responsible shall be liable for the unpaid wages and arty liquidated damages.
The County shall upon its own action or upon written request from the HUD withhold or cause to be withheld any money payable on account for work performed by the contractor or subcontractor. Also, money payable to the same contractor may be withheld from other federal contracts. This also applies to any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor. The amount of money withheld may be determined by the amount necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages.
DEBARMENT PROCEEDING
Whenever any contractor or subcontractor is found to be in aggravated or willful violation of the labor standards provisions of any applicable statutes or who have been found to have disregarded required obligations to employees under the Davis-Bacon Act, such contractors or subcontractors shall be ineligible to receive any federal contracts.
Please Review and Complete the Applicable Exhibits
424
A1
Exhibit A
BABA Covered Materials and Manufactured Goods
Acknowledgement
The Contractor or subcontractor will need to insert a draft of Exhibit B of covered materials and manufactured goods (BABA Construction Materials List) for the construction work covered in the referenced project and must be initially submitted to the listed City and County at the start of construction and updated and submitted whenever new covered materials and manufactured goods are included for the project.
A final complete copy of the Materials List (Exhibit B) must be submitted with the final request for payment from the contractor/subcontractor.
Additional information and resources are provided at the following HUD BABA websites:
• https://www.hudexchange.info/programs/baba/.
• https://files.hudexchange.info/resources/documents/BABA-Quick-GuideCDBG.pdf • January 13, 2025, CPD Implementation Guidance for BABA at https://www.hud.gov/sites/dfiles/OCHCO/documents/cpd-25-01.pdf (Exhibit B)
A. HUD Construction Materials Group
HUD’s waiver breaks construction materials into two groups for the purposes of HUD’s phased implementation: “specially listed” and “all other construction materials.” Specifically Listed
• Metals other than iron or steel (non- ferrous metals) • Lumber
• Composite building materials
• Plastic and polymer-based pipe and tube (i.e., PVC pipe) All Other Construction Materials
• Glass
• Drywall
• Other construction materials
Manufactured Products
• A material or supply used in an infrastructure project that is not iron or steel or a construction material.
425
A2
HUD General Waivers and project-specific waiver categories are specified categories are specified in 88 FR 17001. A contractor may request a project-specific waiver from the County, but waivers may take up to 90 days for final approval from both the County and HUD. The following are the current waivers in place:
Please Note: Should a contractor be interested in soliciting a waiver, please reach out to the Stanislaus County (further instructions will be given upon the request of the waiver).
Upon the request of the waiver, the contractor must submit in writing to Public Works an explanation of how the project is eligible for one of the current waivers in place as part of the project bid.
The County will review the submittal and provide a response of receipt within 10 business days and notification of acceptance or denial of request will be given within the 90-day time frame.
Intentionally Left Blank- Please Refer to pg. A3
Phased Implementation
Waiver published March
15, 2023, establishes a
phased implementation
Phased Implementation
schedule for application of
the BAP to HUD programs.
xigent Circumstances
BAP may be waived if
projects must be
completed immediately to
protect life, ensure safety,
or prevent the destruction
of property
ffective until ovember
23, 2027
, Small Grants, Minor Components
BAP waived for projects with a total cost of
250,000 or less
BAP waived for a de minimis portion that
comprises no more than 5
percent of the total cost of
covered materials used in
a project, up to 1 million
ffective until ovember
23, 2027
426
A3
Instructions to Contractor/Subcontractor
Please complete the applicable section and information below pertaining to the project(s) in which this Material Acknowledgement references.
Stanislaus County Public Works Infrastructure Project or Urban County City Projects ☐ As the Prime Contractor and any subcontractor submitting this document on behalf of Stanislaus County Public Works, I the undersigned acknowledge that all documentation pertaining to the following project is true and correct to best of my knowledge.
Name of
Representative
Submitting Document:
Title of Representative:
Project Name:
Project Location:
Name of Contractor:
Name of
Subcontractor:
Funding Type:
Signature of
Representative: Date:
☐ As the Prime Contractor and any subcontractor submitting this document on behalf of the City of __________________, I the undersigned acknowledge that all documentation pertaining to the following project is true and correct to best of my knowledge.
Name of
Representative
Submitting Document:
Title of Representative:
Project Name:
Project Location:
Name of Contractor:
Name of
Subcontractor:
Funding Type:
Signature of
Representative: Date:
427
Grantee/Community:
Contractor/Subcontractor:
Contract/Project Number:
Grant Contact:
Grant Contact E-mail/Phone:
Type of Material or Good Manfacturer and Model Manufacturing Country of Origin Exhibit B
This list of covered materials and manufactured good for the above referenced project must be initially submitted to the listed grant contact at the start of construction and updated and submitted whenever new covered materials and manufactured goods are included for the project. A final complete copy of the list must be submitted with the final request for payment from the contractor/subcontractor.
BABA COVERED MATERIALS &
MANUFACTURED GOODS LIST
Stanislaus County Planning and Community Development Dept.
[email protected] / 209-525-6330
HUD Supplementatl General Conditions Documents
Attachment 3 - Build America, Buy America 2/4/2025)
428
Exhibit C
Disadvantaged Business Enterprise Participation
Division of Equal Opportunity Certified:
DBE ☐ Minority ☐ Women ☐ (Check Appropriate Designation) Description of Work:
Subcontractor Information
Contractor Name
$ ☐ DBE ☐ Minority ☐ Women
Estimated Dollar Value of Proposed Work Division of Equal Opportunity Certified Description of Work:
Subcontractor Information
Contractor Name
$ ☐ DBE ☐ Minority ☐ Women
Estimated Dollar Value of Proposed Work Division of Equal Opportunity Certified Description of Work:
429
Subcontractor Information
Contractor Name
$ ☐ DBE ☐ Minority ☐ Women
Estimated Dollar Value of Proposed Work Division of Equal Opportunity Certified Description of Work:
Subcontractor Information
Contractor Name
$ ☐ DBE ☐ Minority ☐ Women
Estimated Dollar Value of Proposed Work Division of Equal Opportunity Certified Description of Work:
TOTAL VALUE OF ALL DBE/MINORITY/WOMEN SUBCONTRACT WORK: $ __________________ ESTIMATED TOTAL PERCENT (%) TO BE UTILIZED: ____________ % Signature: _____________________________ Date: __________________________ Print Name:_____________________________ Title: ___________________________ 430
Exhibit D
Stanislaus County
Disadvantaged Business Enterprise Participation Certification Project No. Bid No. Contract No.
Contract/Project Name(s)
This is a formal certification that the below list of Disadvantage Business Enterprise Sub- Contractor(s) and amount(s) were utilized on the above project. This form is required at project completion.
DBE
SUB-CONTRACTOR
SUB-CONTRACTOR
AMOUNT AMOUNT PAID
Signature Date
Name (Printed) Title
Send To: Stanislaus County
Department of Planning and Community Development
Attention: Deputy Director of Community Development
1010 10th Street, Suite 3400
Modesto, CA 95354
431
C1 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) Exhibit E
HUD-4010 U.S. Department of Housing and Urban
Development
Federal Labor Standards Provisions Office of Davis-Bacon and Labor Standards
A. APPLICABILITY
The Project or Program to which the construction work covered by this Contract pertains is being assisted by the United States of America, and the following Federal Labor Standards Provisions are
included in this Contract pursuant to the provisions applicable to such Federal assistance.
1. Minimum wages and fringe benefits
i. All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in 29 CFR
5.5(d) and (e), the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(v) of these contract clauses; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer’s payroll records accurately set forth the time spent in each classification in which work is performed.
The wage determination (including any additional classifications and wage rates conformed under 29 CFR 5.5(a)(1)(iii)) and the Davis-Bacon poster (WH-1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. ii. Frequently recurring classifications
A. In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f),
wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to 29 CFR 5.5(a)(1)(iii), provided that:
1. The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;
2. The classification is used in the area by the construction industry; and
3. The wage rate for the classification bears a reasonable relationship to the prevailing wage rates
contained in the wage determination.
432
C2 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) B. The Administrator will establish wage rates for such classifications in accordance with 29 CFR
5.5(a)(1)(iii)(A)(3). Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
iii. Conformance
A. The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
1. The work to be performed by the classification requested is not performed by a classification in the wage determination; and
2. The classification is used in the area by the construction industry; and
3. The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
B. The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.
C. If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to [email protected]. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
D. In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to [email protected], refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
E. The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under 29 CFR 5.5 (a)(1)(iii)(C) and (D). The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to 29 CFR 5.5 (a)(1)(iii)(C) or (D) must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. iv. Fringe benefits not expressed as an hourly rate
Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof. v. Unfunded plans
If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in 29 CFR 5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the 433
C3 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
vi. Interest In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
2. Withholding
i. Withholding requirements
The U. S. Department of Housing and Urban Development may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in 29 CFR 5.5(a) for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in 29 CFR 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor’s failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work (or otherwise working in construction or development of the project under a development statute) all or part of the wages required by the contract, or upon the contractor’s failure to submit the required records as discussed in 29 CFR 5.5(a)(3)(iv), HUD may on its own initiative and after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. ii. Priority to withheld funds
The Department has priority to funds withheld or to be withheld in accordance with 29 CFR
5.5(a)(2)(i) or (b)(3)(i), or both, over claims to those funds by:
A. A contractor’s surety(ies), including without limitation performance bond sureties and payment bond sureties;
B. A contracting agency for its reprocurement costs;
C. A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor’s bankruptcy estate; D. A contractor’s assignee(s);
E. A contractor’s successor(s); or
F. A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
3. Records and certified payrolls
i. Basic record requirements
A. Length of record retention. All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
B. Information required Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker’s correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid. 434
C4 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) C. Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(v) that the wages of any laborer or mechanic include the amount of any
costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
D. Additional records relating to apprenticeship Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
ii. Certified payroll requirements
A. Frequency and method of submission The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to HUD if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to HUD. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system B. Information required The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under 29 CFR
5.5(a)(3)(i)(B), except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker (e.g., the last four digits of the worker’s Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH-347 or in any other format desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at https://www.dol.gov/ sites/dolgov/files/WHD/legacy/files/wh347.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records).
E. Statement of Compliance Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor’s or subcontractor’s agent who pays or supervises the payment of the persons working on the
contract, and must certify the following:
1. That the certified payroll for the payroll period contains the information required to be provided under 29 CFR 5.5(a)(3)(ii), the appropriate information and basic records are being maintained under 29 CFR 5.5 (a)(3)(i), and such information and records are correct and complete;
435
C5 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete)
2. That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; and
3. That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.
D. Use of Optional Form WH-347 The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 will satisfy the requirement for submission of the “Statement of Compliance” required by 29 CFR
5.5(a)(3)(ii)(C).
E. Signature The signature by the contractor, subcontractor, or the contractor’s or subcontractor’s agent must be an original handwritten signature or a legally valid electronic signature.
F. Falsification The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
G. Length of certified payroll retention The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed. iii. Contracts, subcontracts, and related documents The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
iv. Required disclosures and access
A. Required record disclosures and access to workers The contractor or subcontractor must make the records required under 29 CFR 5.5(a)(3)(i)–(iii), and any other documents that HUD or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by 29 CFR 5.1, available for inspection, copying, or transcription by authorized representatives of HUD or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.
B. Sanctions for non-compliance with records and worker access requirements If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job, the Federal agency may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, that maintains such records or that employs such workers, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available, or to permit worker interviews during working hours on the job, may be grounds for debarment action pursuant to 29 CFR 5.12. In addition, any contractor or other person that fails to submit the required records or make those records available, to WHD within the time WHD requests that the records be produced will be precluded from introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the required records that were not provided or made available to WHD. WHD will take into consideration a reasonable request from the contractor or person for an extension of the time for submission of records. WHD will determine the reasonableness of the request and may consider, among other things, the location of the records and the volume of production. 436
C6 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) C. Required Information Disclosures Contractors and subcontractors must maintain the full Social Security number and last known address, telephone number, and email address each covered worker, and must provide them upon request to HUD if the agency is a party to the contract, or to the Wage and Hour Division of the Department of Labor. If the Federal agency is not such a party to the contract, the contractor, subcontractor, or both, must, upon request, provide the full Social Security number and last known address, telephone number, and email address of each covered worker to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to HUD, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or other compliance action.
4. Apprentices and equal employment opportunity
i. Apprentices
A. Rate of pay Apprentices will be permitted to work at less than the predetermined rate for the work they perform when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S.
Department of Labor, Employment and Training Administration, Office of Apprenticeship (OA), or with a State Apprenticeship Agency recognized by the OA.
A person who is not individually registered in the program, but who has been certified by the OA or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice, will be permitted to work at less than the predetermined rate for the work they perform in the first 90 days of probationary employment as an apprentice in such a program. In the event the OA or a State Apprenticeship Agency recognized by the OA withdraws approval of an apprenticeship program, the contractor will no longer be permitted to use apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
B. Fringe benefits Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringe benefits must be paid in accordance with that determination.
C. Apprenticeship ratio The allowable ratio of apprentices to journey workers on the job site in any craft classification must not be greater than the ratio permitted to the contractor as to the entire work force under the registered program or the ratio applicable to the locality of the project pursuant to 29 CFR 5.5(a)(4)(i)(D). Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in 29 CFR 5.5(a)(4)(i)(A), must be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under this section must be paid not less than the applicable wage rate on the wage determination for the work actually performed.
D. Reciprocity of ratios and wage rates Where a contractor is performing construction on a project in a locality other than the locality in which its program is registered, the ratios and wage rates (expressed in percentages of the journey worker’s hourly rate) applicable within the locality in which the construction is being performed must be observed. If there is no applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified in the contractor’s registered program must be observed.
ii. Equal employment opportunity The use of apprentices and journey workers under this part must be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
437
C7 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete)
5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.
6. Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses contained in 29 CFR 5.5(a)(1) through (11), along with the applicable wage determination(s) and such other clauses or contract modifications as the U.S. Department of Housing and Urban Development may by appropriate instructions require, and a clause requiring the subcontractors to include these clauses and wage determination(s) in any lower tier subcontracts. The prime contractor is responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in this section. In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and may be subject to debarment, as appropriate.
7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
8. Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.
9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S.
Department of Labor, or the employees or their representatives.
10. Certification of eligibility.
i. By entering into this contract, the contractor certifies that neither it nor any person or firm who has an interest in the contractor’s firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b) or 29 CFR 5.12(a). ii. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b) or 29 CFR 5.12(a). iii.The penalty for making false statements is prescribed in the U.S. Code, Title 18 Crimes and Criminal Procedure, 18 U.S.C. 1001.
11. Anti-retaliation It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
i. Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the DBA, Related Acts, or 29 CFR parts 1, 3, or 5; ii. Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under the DBA, Related Acts, or 29 CFR parts 1, 3, or 5; iii. Cooperating in any investigation or other compliance action, or testifying in any proceeding under the DBA, Related Acts, or 29 CFR parts 1, 3, or 5; or iv. Informing any other person about their rights under the DBA, Related Acts, or 29 CFR parts 1, 3, or 5.
B. Contract Work Hours and Safety Standards Act (CWHSSA) The Agency Head must cause or require the contracting officer to insert the following clauses set forth in 29 CFR 5.5(b)(1), (2), (3), (4), and (5) in full, or (for contracts covered by the Federal Acquisition Regulation) by reference, in any contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses must
438
C8 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) be inserted in addition to the clauses required by 29 CFR 5.5(a) or 4.6. As used in this paragraph, the terms “laborers and mechanics” include watchpersons and guards.
1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.
2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in 29 CFR 5.5(b)(1) the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages and interest from the date of the underpayment. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchpersons and guards, employed in violation of the clause set forth in 29 CFR 5.5(b)(1), in the sum of $31 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in 29 CFR 5.5(b)(1).
3. Withholding for unpaid wages and liquidated damages
i. Withholding process The U.S Department of Housing and Urban Development or the recipient of Federal assistance may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for any unpaid wages; monetary relief, including interest; and liquidated damages required by the clauses set forth in 29 CFR 5.5(b) on this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act that is held by the same prime contractor (as defined in 29 CFR 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to the Contract Work Hours and Safety Standards Act and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. ii Priority to withheld funds The Department has priority to funds withheld or to be withheld in accordance with 29 CFR 5.5(a)(2)(i) or (b)(3)(i), or both, over claims to those funds by:
A. A contractor’s surety(ies), including without limitation performance bond sureties and payment bond sureties;
B. A contracting agency for its reprocurement costs;
C. A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor’s bankruptcy estate;
D. A contractor’s assignee(s);
E. A contractor’s successor(s); or
F. A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
4. Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses set forth in 29 CFR 5.5(b)(1) through (5) and a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor is responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in 29 CFR 5.5(b)(1) through (5). In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss,
439
C9 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) due to any workers of lower-tier subcontractors, and associated liquidated damages and may be subject to debarment, as appropriate.
5. Anti-retaliation It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
i. Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the Contract Work Hours and Safety Standards Act (CWHSSA) or its implementing regulations in 29 CFR part 5;
ii. Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under CWHSSA or 29 CFR part 5;
iii. Cooperating in any investigation or other compliance action, or testifying in any proceeding under CWHSSA or 29 CFR part 5; or
iv. Informing any other person about their rights under CWHSSA or 29 CFR part 5.
C. CWHSSA required records clause In addition to the clauses contained in 29 CFR 5.5(b), in any contract subject only to the Contract Work Hours and Safety Standards Act and not to any of the other laws referenced by 29 CFR 5.1, the Agency Head must cause or require the contracting officer to insert a clause requiring that the contractor or subcontractor must maintain regular payrolls and other basic records during the course of the work and must preserve them for a period of 3 years after all the work on the prime contract is completed for all laborers and mechanics, including guards and watchpersons, working on the contract. Such records must contain the name; last known address, telephone number, and email address; and social security number of each such worker; each worker’s correct classification(s) of work actually performed; hourly rates of wages paid; daily and weekly number of hours actually worked; deductions made and actual wages paid. Further, the Agency Head must cause or require the contracting officer to insert in any such contract a clause providing that the records to be maintained under this paragraph must be made available by the contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the (write the name of agency) and the Department of Labor, and the contractor or subcontractor will permit such representatives to interview workers during working hours on the job.
D. Incorporation of contract clauses and wage determinations by reference Although agencies are required to insert the contract clauses set forth in this section, along with appropriate wage determinations, in full into covered contracts, and contractors and subcontractors are required to insert them in any lower-tier subcontracts, the incorporation by reference of the required contract clauses and appropriate wage determinations will be given the same force and effect as if they were inserted in full text.
E. Incorporation by operation of law The contract clauses set forth in this section (or their equivalent under the Federal Acquisition Regulation), along with the correct wage determinations, will be considered to be a part of every prime contract required by the applicable statutes referenced by 29 CFR 5.1 to include such clauses, and will be effective by operation of law, whether or not they are included or incorporated by reference into such contract, unless the Administrator grants a variance, tolerance, or exemption from the application of this paragraph.
Where the clauses and applicable wage determinations are effective by operation of law under this paragraph, the prime contractor must be compensated for any resulting increase in wages in accordance with applicable law.
F. HEALTH AND SAFETY
The provisions of this paragraph (F) are applicable where the amount of the prime contract exceeds $100,000.
1. No laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his or her health and safety, as determined under construction safety and health standards promulgated by the Secretary of Labor by regulation.
2. The contractor shall comply with all regulations issued by the Secretary of Labor pursuant to 29 CFR Part 1926 and failure to comply may result in imposition of sanctions pursuant to the 440
C10 Form HUD-4010 (10/2023) – Ref. Handbook 1344.1- Previous Editions (Obsolete) Contract Work Hours and Safety Standards Act, (Public Law 91-54, 83 Stat 96), 40 U.S.C. § 3701 et seq.
3. The contractor shall include the provisions of this paragraph in every subcontract, so that such provisions will be binding on each subcontractor. The contractor shall take such action with respect to any subcontractor as the Secretary of Housing and Urban Development or the Secretary of Labor shall direct as a means of enforcing such provisions. 441
F1 Section 3 Regulations & Documents
Exhibit F
Section 3 Supplemental Information
I. INTRODUCTION AND PURPOSE
Title 24 CFR Part 75: Economic Opportunity for Low- and Very Low-Income Persons, is the statutory repository for the U.S. Housing and Urban Development’s (HUD) Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u). Section 3 of the Housing and Urban Development Act of 1968 recognizes that federal financial assistance can also become a tool to expand economic opportunities for low- and very low-income families and businesses of the neighborhoods and communities where HUD invests public resources.
As a recipient of federal funds, the Community Development Block Grant (CDBG) program and its sub-recipients (grantees) shall comply with Section 3 requirements set forth at 24 CFR 75 of the federal regulation which states that, to the greatest extent possible, businesses and employers working on HUD-funded projects must make a good faith effort to train and employ low-income individuals living in the local area and also to contract with businesses owned by or that employ Section 3 workers.
Section 3 requirements apply to grantees that plan to obligate or commit an aggregate amount of $200,000 or more in CDBG assistance to projects involving infrastructure during a given annual reporting period (calendar year). The $200,000 funding threshold is comprised of the combined expenditure of all funding sources set forth in 24 CFR 135.5.
II. GLOSSARY OF TERMS AND DEFINITIONS | 24 CFR § 75.5
Contractor means any entity entering into a contract with:
1. A recipient to perform work in connection with the expenditure for work in connection with a Section 3 project; or
2. A subrecipient for work in connection with a Section 3 project.
Labor hours mean the number of paid hours worked by persons on a Section 3 project.
Low-income and very low-income person(s) means Low- and very low-income limits are defined in Section 3(b)(2) of the Housing Act of 1937 and are determined annually by HUD. These limits are typically established at 80 percent and 50 percent of the area median individual income. HUD income limits may be obtained from:
https://www.huduser.gov/portal/datasets/il.html.
Material supply contracts means contracts for the purchase of products and materials, including, but not limited to, lumber, drywall, wiring, concrete, pipes, toilets, sinks, carpets, and office supplies.
442
F2 Section 3 Regulations & Documents
Professional services1 mean non-construction services that require an advanced degree or professional licensing, including, but not limited to, contracts for legal services, financial consulting, accounting services, environmental assessment, architectural services, and civil engineering services.
Recipient means any entity that receives directly from HUD housing and community development assistance that funds Section 3 projects, including, but not limited to, any State, local government, instrumentality, or other public agency, public or private nonprofit organization.
Section 3 means Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. 1701u).
Section 3 business concern means:
1. A business concern meeting at least one of the following criteria, documented within the last six-month period:
a. It is at least 51 percent owned and controlled by low- or very low-income persons;
b. Over 75 percent of the labor hours performed for the business over the prior three-month period are performed by Section 3 workers; or c. It is a business at least 51 percent owned and controlled by current public housing residents or residents who currently live in Section 8-assisted housing.
2. The status of a Section 3 business concern shall not be negatively affected by a prior arrest or conviction of its owner(s) or employees.
3. Nothing in this part shall be construed to require the contracting or subcontracting of a Section 3 business concern. Section 3 business concerns are not exempt from meeting the specifications of the contract.
Section 3 project means a housing rehabilitation, housing construction, and other public construction projects assisted under HUD programs that provide housing and community development financial assistance when the total amount of assistance to the project exceeds a threshold of $200,000. The project is the site or sites together with any building(s) and improvements located on the site(s) that are under common ownership, management, and financing. The requirements of Part 75 apply to an entire Section 3 project, regardless of whether the project is fully or partially assisted under HUD programs that provide housing and community development financial assistance. 1 In the final rule, HUD amended the professional services definition to clarify that only non-construction services that require an advanced degree or professional licensing, rather than all non-construction services, are excluded from Section 3. HUD wants to ensure this final rule's emphasis the statutory requirement to prioritize low- and very low-income workers and provides this category of exempted workers from reporting given the challenge to hire low- and very low-income workers in jobs that require such degrees and licensing.
443
F3 Section 3 Regulations & Documents
Section 3 worker means:
1. Any worker who currently fits or when hired within the past five years fit at least one of the following categories, as documented:
a. The worker's income for the previous or annualized calendar year is below the income limit established by HUD.
b. The worker is employed by a Section 3 business concern. c. The worker is a YouthBuild participant.
2. The status of a Section 3 worker shall not be negatively affected by a prior arrest or conviction.
3. Nothing in this part shall be construed to require the employment of someone who meets this definition of a Section 3 worker. Section 3 workers are not exempt from meeting the qualifications of the position to be filled.
Section 8-assisted housing refers to housing receiving project-based rental assistance or tenant-based assistance under Section 8 of the 1937 Act. Service area or the neighborhood of the project means an area within one mile of the Section 3 project or, if fewer than 5,000 people live within one mile of a Section 3 project, within a circle centered on the Section 3 project that is sufficient to encompass a population of 5,000 people according to the most recent U.S. Census.
Small Public Housing Authority (PHA) means a public housing authority that manages or operates fewer than 250 public housing units.
Subcontractor means any entity that has a contract with a contractor to undertake a portion of the contractor's obligation to perform work in connection with the expenditure of public housing financial assistance or for a Section 3 project.
Subrecipient has the meaning provided in the applicable program regulations or in 2 CFR 200.93.
Targeted Section 3 worker has the meanings provided in §§ 75.11, 75.21, or 75.29, and does not exclude an individual that has a prior arrest or conviction.
YouthBuild programs refers to YouthBuild programs receiving assistance under a community-based pre-apprenticeship program that provides job training and educational opportunities for at-risk youth ages 16-24 who have previously dropped out of high school.
YouthBuild participants learn vocational skills in construction, as well as in other indemand industries that include health care, information technology, and hospitality. Youth also provide community service through the required construction or rehabilitation of affordable housing for low-income or homeless families in their own neighborhoods.
III. SECTION 3 THRESHOLDS AND APPLICABILITY | 24 CFR § 75.3 Threshold: Housing and Community Development Financial Assistance.
Section 3 Community Development Block Grant (CDBG) projects such as infrastructure or other public construction projects assisted under HUD programs that provide housing 444
F4 Section 3 Regulations & Documents
and community development financial assistance when the total amount of assistance to the project exceeds $200,000 of housing and community development financial assistance. The project is defined as the site or sites together with any building(s) and improvements located on the site(s) that are under common ownership, management, and financing.
• Dollar-Thresholds: Section 3 applies when these thresholds are met:
o The grant administering entity receives more than $200,000 in grant funds and invests any amount of these funds to carry out a CDBG activity (including demolition and lead-based paint abatement). The administering entity includes the grantee, as well as any subrecipient (unit of local government) or subrecipient (nonprofit organization) that receives over $200,000.
o A contractor/subcontractor of a project receives a contract for $100,000 or more in grant assistance.
Once it is determined that Section 3 applies to a project, the Section 3 requirements apply to all contracts, provided that at least $1 of grant funds is being used. If the grant administering agency receives more than $200,000 in grant funds, but no single contractor is awarded more than $100,000, then the Section 3 requirements apply to the training, employment, and contracting activities of the grantee, or subrecipient but not to those of the contractor(s) of the project. This means new hiring and contracting opportunities generated by the grantee, subrecipient that is related to work arising in connection with the HUD-assisted new construction or rehabilitation project would be subject to the Section 3 hiring and contracting goals.
Applicability: Housing and Community Development Financial Assistance.
Section 3 applies to:
• Section 3 projects, as described above under Thresholds o Section 3 requirements apply to an entire project, regardless of whether the project is fully or partially assisted under HUD programs that provide housing and community development financial assistance
Section 3 requirements do not apply to:
• Material Supply Contracts - § 75.3(b)
• Indian and Tribal Preferences - § 75.3(c)
o Contracts, subcontracts, grants, or subgrants subject to Section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5307(b)) or subject to tribal preference requirements as authorized under 101(k) of the Native American Housing Assistance and Self-Determination Act (25 U.S.C. 4111(k)) must provide preferences in employment, training, and business opportunities to Indians and Indian organizations, and are therefore not subject to Section 3 requirements
445
F5 Section 3 Regulations & Documents
• Other HUD assistance and other federal assistance - § 75.3(d) o Recipients that are not subject to Section 3 are encouraged to consider ways to support the purpose of Section 3
IV. INTENDED BENEFICIARIES
Section 3 Workers | 24 CFR 75.5
Section 3 requires that recipients of certain HUD funding make best efforts to provide “Section 3 workers” with employment and training opportunities arising in connection to a Section 3 project. The final rule defines “Section 3 workers” as any worker who currently fits, or when hired fit, at least one of the following categories, as documented within the past five years:
1. The worker’s income for the previous or annualized calendar year is below the income limit established by HUD
2. The worker is employed by a Section 3 business concern
3. The worker is a YouthBuild participant
Targeted Section 3 Workers | 24 CFR § 75.5
The final rule also defines “Targeted Section 3 worker” to implement the statutory requirement that recipients or contractors prioritize Section 3 workers in these selected categories for employment and training opportunities and to allow HUD to track these efforts.
For housing and community development financial assistance programs, a Targeted Section 3 worker is a Section 3 worker who is also:
• A worker employed by a Section 3 business concern; or • A worker who currently fits, or when hired fit, at least one of the following categories, as documented within the past five years:
o Living within one mile of the service area or the neighborhood of the project; If fewer than 5,000 people live within one mile of a Section 3 project, within a circle centered on the Section 3 project that is sufficient to encompass a population of 5,000 people according to the most recent U.S. Census.
• A YouthBuild participant
Section 3 Business Concerns | 24 CFR § 75.5
The final rule requires that when feasible, recipients must make best efforts to direct contracts for work arising in connection with Section 3 project to “Section 3 business concerns”. The final rule includes a revised definition of “Section 3 business concerns” that reflects the change from counting new hires to counting labor hours and increases the threshold of work performed by a business’ low- and very low-income workers. The final rule also includes all Section 3 business concerns’ labor hours in the definition of both Section 3 workers and Targeted Section 3 workers.
Section 3 business concerns are businesses that meet at least one of the following criteria, documented within the last six-month period:
446
F6 Section 3 Regulations & Documents
• At least 51 percent owned and controlled by low- or very low-income persons; • Over 75 percent of the labor hours performed for the business over the prior threemonth period are performed by Section 3 workers; or • A business at least 51 percent owned and controlled by current public housing residents or residents who currently live in Section 8-assisted housing.
V. PRIORITIZATION REQUIREMENTS FOR HOUSING AND COMMUNITY
DEVELOPMENT FINANCIAL ASSISTANCE
Employment and Training | 24 CFR § 75.19
To the greatest extent feasible, recipients of housing and community development financial assistance shall ensure that employment and training opportunities arising in connection with Section 3 projects are provided to Section 3 workers within the County project area (or City area) in which the project is located in the following order of priority:
1. Section 3 workers residing within the service area or the neighborhood of the project
2. Participants in YouthBuild programs
Contracting | 24 CFR § 75.19
To the greatest extent feasible recipients of housing and community development financial assistance shall ensure contracts for work awarded in connection with Section 3 projects are provided to business concerns that provide economic opportunities to Section 3 workers residing within the County project area (or City area) in which the project is located in the following order of priority:
1. Section 3 business concerns that provide economic opportunities to Section 3 workers residing within the service area or the neighborhood of the project
2. YouthBuild programs
VI. BENCHMARKS AND SAFE HARBOR - HOUSING AND COMMUNITY
DEVELOPMENT FINANCIAL ASSISTANCE FOR CDBG PROJECTS | 24 CFR § 75.23 For meeting the safe harbor in § 75.23, recipients that certify to following the prioritization in § 75.19 and meet or exceed the following Section 3 benchmarks will be considered to have complied with Section 3 requirements, absent evidence to the contrary:
1. 25 percent or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers; and
2. 5 percent or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers.
All Sub-recipients are required to report all labor hours.
The benchmark goal for Section 3 workers is set at 25 percent or more of the total number of labor hours worked by all workers on a Section 3 project.
447
F7 Section 3 Regulations & Documents
Section 3 Workers Labor Hours / Total Labor Hours= 25%
The benchmark goal for Targeted Section 3 workers is set at 5 percent or more of the total number of labor hours worked by all workers on a Section 3 project. This means that the 5 percent is included as part of the 25 percent threshold.
Targeted Section 3 Labor Hours / Total Labor Hours = 5% The chart below is an example of the order of preference:
SECTION 3 WORKER TRACKING AND REPORTING
All Sub-recipients, contractors and sub-contractors are required to comply with the reporting requirements set for at 24 CFR 75.25. Where Targeted Section 3 and Section 3 Workers are currently employed or new hires, the Sub-recipients must track those labor hours performed by those workers. In conjunction with the Davis-Bacon payroll requirement, Sub-recipients will utilize the Section 3 tracking form for this purpose and submitted with each payroll submission.
Qualitative Reporting | 24 CFR § 75.15 and 24 CFR § 75.25 Section 3 recipients will be considered to have complied with the Section 3 requirements and met the safe harbor, in the absence of evidence to the contrary, if they certify that they have followed the required prioritization of qualitative effort and met or exceeded the applicable Section 3 benchmarks. Such qualitative efforts may, for example, include but are not limited to the following:
• Engaged in outreach efforts to generate job applicants who are Targeted Section 3 workers
• Provided training or apprenticeship opportunities
• Provided technical assistance to help Section 3 workers compete for jobs (e.g., resume assistance, coaching)
All Workers
All Section
Workers
Targeted Section
3 Workers
448
F8 Section 3 Regulations & Documents
• Provided or connected Section 3 workers with assistance in seeking employment including: drafting resumes, preparing for interviews, and finding job opportunities connecting residents to job placement services
• Held one or more job fairs
• Provided or referred Section 3 workers to services supporting work readiness and retention (e.g., work readiness activities, interview clothing, test fees, transportation, childcare)
• Provided assistance to apply for/or attend community college, a four-year educational institution, or vocational/technical training • Assisted Section 3 workers to obtain financial literacy training and/or coaching • Engaged in outreach efforts to identify and secure bids from Section 3 business concerns
• Provided technical assistance to help Section 3 business concerns understand and bid on contracts
• Divided contracts into smaller jobs to facilitate participation by Section 3 business concerns
• Provided bonding assistance, guaranties, or other efforts to support viable bids from Section 3 business concerns
• Promoted use of business registries designed to create opportunities for disadvantaged and small businesses
• Outreach, engagement, or referrals with the state one-stop system as defined in Section 121(e)(2) of the Workforce Innovation and Opportunity Act VII. REPORTING ON HOUSING AND COMMUNITY DEVELOPMENT FINANACIAL ASSISTANCE FOR CDBG PROJECTS | 24 CFR § 75.25
For Section 3 projects, recipients must report the following data annually to HUD on all CDBG projects completed within the reporting year and in a manner consistent with reporting requirements for the applicable HUD program:
1. The total number of labor hours worked
2. The total number of labor hours worked by Section 3 workers
3. The total number of labor hours worked by Targeted Section 3 workers The labor hours reported must include the total number of labor hours worked on a Section 3 project by all workers, including labor hours worked by any subrecipients, contractors, and subcontractors that the recipient is required to, or elects to, report.
Professional Services: Recipients reporting under this section, as well as subrecipients, contractors and subcontractors who report to recipients, may report labor hours by Section 3 workers and labor hours by Targeted Section 3 workers from professional services without including labor hours from professional services in the total number of labor hours worked. If a contract covers both professional services and other work and the recipient or contractor or subcontractor chooses not to report labor hours from professional services, the labor hours under the contract that are not from professional services must still be reported.
449
F9 Section 3 Regulations & Documents
Good Faith Assessment: Recipients may report their own labor hours or that of a subrecipient, contractor, or subcontractor based on the employer’s good faith assessment of the labor hours of a full-time or part-time employee informed by the employer’s existing salary or time and attendance-based payroll systems, unless the project or activity is otherwise subject to requirements specifying time and attendance reporting.
Qualitative Reporting: If the recipient’s reporting indicates that the recipient has not met the Section 3 benchmarks, the recipient must report in a form prescribed by HUD on the qualitative nature of its activities and those its contractors and subcontractors pursued (see section above).
VIII. CONTRACT PROVISIONS | 24 CFR § 75.27
Recipients must include language applying Section 3 requirements in any subrecipient agreement or contract for a Section 3 project. They must also require subrecipients, contractors, and subcontractors to meet the prioritization requirements of § 75.19, regardless of whether Section 3 language is included in recipient or subrecipient agreements, program regulatory agreements, or contracts.
IX. SECTION 3 AND TARGETED SECTION 3 WORKERS AND BUSINESS CONCERNS
CERTIFICATION
Section 3 Worker and Certification
The Sub-recipient will utilize the Section 3 Certification Form to document the status of a Section 3 worker. The status of a Section 3 worker shall not be negatively affected by a prior arrest or conviction. Nothing in this part shall be construed to require the employment of someone who meets this definition of a Section 3 worker. Section 3 workers are not exempt from meeting the qualifications of the position to be filled. (Exhibit ?) Targeted Section 3 Worker and Certification
The Sub-recipient will utilize the Targeted Section 3 Certification Form to document the status of a Targeted Section 3 worker. The status of a Targeted Section 3 worker shall not be negatively affected by a prior arrest or conviction. Nothing in this part shall be construed to require the employment of someone who meets this definition of a Section 3 worker.
Section 3 workers are not exempt from meeting the qualifications of the position to be filled. (Exhibit ?)
Section 3 Business Concerns Certification
In accordance with the regulation, residents and businesses concerns seeking Section 3 preference shall certify, or submit evidence to the recipient, contractor, subcontractor or subrecipient (if requested) verifying that they meet the definitions provided above. (Exhibit ?)
Sub-recipients can use their discretion for determining the type of verification that is required by prospective Section 3 workers and business concerns. Some examples include proof of residency in a public housing authority; proof of federal subsidies for housing, food stamps, or unemployment benefits; and payroll data or other relevant business information.
450
F10 Section 3 Regulations & Documents
As provided in 2 CFR 200.318, contract awards shall only be made to responsible contractors possessing the ability to perform under the terms and conditions of the proposed contract.
Qualifying as a Section 3 businesses does not mean that the business will be selected if it meets the technical requirements of the bid, regardless of bid price.
X. SUB-RECIPIENT REQUIREMENTS
Sub-recipients are required to ensure their own compliance and the compliance of their contractors/subcontractors with the Section 3 regulations, as outlined at 24 CFR part 75.
These responsibilities include but are not limited to the following:
1. Designing and implementing procedures to comply with the requirements of Section 3: The Sub-recipient must take an active role in ensuring Section 3 compliance. The first step is implementing procedures to ensure that all parties, including residents, businesses, contractors, and subcontractors, comply with Section 3 and maintain records verifying that compliance.
2. Facilitating the training and employment of Section 3 workers: The Subrecipient must act as a facilitator, connecting Section 3 workers to training and employment opportunities.
3. Facilitating the award of contracts to Section 3 business concerns: The Subrecipient must also work to link developers and contractors with capable Section 3 business concerns. Additionally, recipient agencies, when necessary, may direct Section 3 business concerns to organizations that provide capacity-building training.
4. Ensuring Contractor and Subcontractor Awareness of and Compliance with Section 3 Benchmarks and responsibilities: The Sub-recipient is responsible for ensuring that contractors and subcontractors are aware of, and in compliance with, Section 3 requirements.
5. Ensuring Compliance and Meeting Numerical Benchmarks: The Sub-recipient shall ensure compliance with Section 3 by assessing the hiring and subcontracting needs of contractors; regularly monitoring contractor compliance; assisting and actively cooperating with the Secretary of HUD in obtaining the compliance of contractors; penalizing non-compliance; providing incentives for good performance; and refraining from entering into contracts with any contractor that previously failed to comply with the requirements of Section 3.
6. Reporting Requirements: The Sub-recipient must document all actions taken to comply with the requirements of Section 3 and report these activities as determined by the funding agency.
451
F11 Section 3 Regulations & Documents
XI. SECTION 3 CONTRACTOR’S REQUIREMENTS
The Prime Contractor must submit a Section 3 plan to the Sub-Recipient outlining Section 3 hiring and employment opportunities.
The Prime Contractor must notify all sub-contractors of their responsibilities under Section
3. The Prime Contractor must provide a permanent workforce breakdown of all current employees and identify those Section 3 workers that were hired within the last five years (see form below).
The Prime Contractor must provide an estimated breakdown of potential hires for the awarded project and timeline of anticipated hiring (see form below).
The Prime Contractor must refrain from contracting with sub-contractors as to whom they have received notice or have knowledge that the sub-contractors have been found in violation of the regulations in 24 § CFR 75.
Maintain records that document a good faith effort to utilize Section 3 workers and Target Section 3 workers as trainees and employees. (Required of both contractor and subcontractor.) and any other qualitative efforts mentioned above to comply with Section 3.
Recordkeeping requirements for recipients are found at 24 CFR § 75.31. The contractor is required to maintain documentation to demonstrate compliance with the regulations and is responsible for requiring their subcontractors to maintain or provide any documentation that will assist recipients in demonstrating compliance, including documentation that shows hours worked by Section 3 workers and Targeted Section 3 workers.
XII. SECTION 3 REPORTING [24 CFR § 75.25]
Reporting of Labor Hours.
1. For Section 3 projects, Sub-recipients must report:
a. The total number of labor hours worked;
b. The total number of labor hours worked by Section 3 workers; and c. The total number of labor hours worked by Targeted Section 3 workers.
2. Section 3 workers' and Targeted Section 3 workers' labor hours may be counted for five years from when their status as a Section 3 worker or Targeted Section 3 worker is established pursuant to § 75.31.
3. The labor hours reported under paragraph (a)(1) of this section must include the total number of labor hours worked on a Section 3 project, including labor hours worked by any subrecipients, contractors and subcontractors that the recipient is required, or elects pursuant to paragraph (a)(4) of this section, to report. 452
F12 Section 3 Regulations & Documents
4. Recipients reporting under this section, as well as subrecipients, contractors and subcontractors who report to recipients, may report labor hours by Section 3 workers, under paragraph (a)(1)(ii) of this section, and labor hours by Targeted Section 3 workers, under paragraph (a)(1)(iii) of this section, from professional services without including labor hours from professional services in the total number of labor hours worked under paragraph (a)(1)(i) of this section. If a contract covers both professional services and other work and the recipient or contractor or subcontractor chooses not to report labor hours from professional services, the labor hours under the contract that are not from professional services must still be reported.
5. Recipients may report their own labor hours or that of a subrecipient, contractor, or subcontractor based on the employer's good faith assessment of the labor hours of a full-time or part-time employee informed by the employer's existing salary or time and attendance-based payroll systems, unless the project or activity is otherwise subject to requirements specifying time and attendance reporting.
Professional Services: The reporting structure in the final rule allows a Sub-recipient to count as Section 3 labor hours and as Targeted Section 3 labor hours any work performed by a Section 3 worker or a Targeted Section 3 worker (i.e., in the numerator of the calculation), even when the professional services as a whole are not counted in the baseline reporting (i.e., in the denominator of the calculation). The effect of this reporting structure is to give a recipient a bonus if they are able to report Section 3 hires in the professional services context.
453
F13 Section 3 Regulations & Documents
SECTION 3 WORKER TRACKING AND REPORTING
All Sub-recipients, contractors and sub-contractors are required to comply with the reporting requirements set for at 24 CFR 75.25. Where Targeted Section 3 and Section 3 Workers are currently employed or new hires, the Sub-recipients must track those labor hours performed by those workers. In conjunction with the Davis-Bacon payroll requirement, Sub-recipients will utilize the Section 3 tracking form for this purpose and submitted with each payroll submission.
Annual Section 3 Reporting Form
All Sub-Recipients must comply with the Section 3 Reporting requirements per 24 § CFR 75. Subrecipients must submit to Stanislaus County all labor hours worked by Targeted Section 3 and Section 3 Workers for the reporting period of October 1st through September 30th of each year.
All Section 3 labors hours are due to Stanislaus County by October 31st following the ending reporting period. Where benchmark goals were not met, the sub-recipient must document their good faith effort to comply with Section 3.
Project Close-Out Requirement
All Sub-recipients are required to provide a final Section 3 labor report at Close-out. The CDBG close-out package has been revised that includes the Section 3 Reporting form. The Sub-recipient must report the total cumulative labor hours to reflect benchmark goals. Sub-recipients who fail to submit the proper close-out will be considered incomplete and may delay final request for cash processing until compliance with the Section 3 reporting has been satisfied.
XIII. RECORDKEEPING [24 CFR 75.31]
HUD and Stanislaus County Planning and Community Development shall have access to all records, reports, and other documents or items of the Sub-recipient that are maintained to demonstrate compliance with the requirements of this part, or that are maintained in accordance with the regulations governing the specific HUD program by which the Section 3 project is governed.
Sub-recipients must maintain documentation, or ensure that a subrecipient, contractor, or subcontractor that employs the worker maintains documentation, to ensure that workers meet the definition of a Section 3 worker or Targeted Section 3 worker, at the time of hire or the first reporting period.
IV. COMPLIANCE [75.33]
Records of compliance.
Each sub-recipient, contractor and subcontractor shall maintain adequate records demonstrating compliance with this part, consistent with other recordkeeping requirements in 2 CFR part 200.
Complaints.
Complaints alleging failure of compliance with this part may be reported to the HUD program office responsible for the public housing financial assistance or the Section 3 project, or to the local HUD field office.
454
F14 Section 3 Regulations & Documents
STANISLAUS COUNTY SECTION 3 PROCEDURES
As a recipient of U.S. Department of Housing and Urban Development (HUD) CDBG, HOME and other federal funds governed by Section 3 of the Housing and Urban Development Act of 1968, Stanislaus County is dedicated to contracting with Section 3 contractors to the greatest extent possible. Subsequently, the County is also dedicated to the utilization of MBE/WBE concerns.
SUBRECIPIENTS AND SECTION 3 REQUIREMENTS FOR COVERED CONTRACTS Stanislaus County shall insure that all sub-recipients are aware of the Section 3 requirements for all covered contracts that are bid and/or awarded during each fiscal year. This procedure will be carried out through two (2) specific activities associated with projects.
ALL SECTION 3 COVERED CONTRACTS SHALL INCLUDE THE FOLLOWING CLAUSE (REFERRED TO AS THE SECTION 3 CLAUSE):
A. The work to be performed under this Contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. §1701u) (“Section 3”).
The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted developments covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons including persons who are recipients of HUD assistance for housing, with preference for both targeted workers living in the service area or neighborhood of the Development and Youthbuild participants, as defined at the final for 24 CFR Part 75 (“Section 3 Regulations”).
B. The Parties agree to comply with HUD's regulations in Section 3 Regulations, which implement Section 3. As evidenced by their execution of this Contract, the Parties certify that they are under no contractual or other impediment that would prevent them from complying with the Section 3 Regulations.
C. The Contractor agrees to send to each labor organization or representative or workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers’ representative of the contractor’s commitments under this Section 3 clause and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth the following: (i) minimum number and job titles subject to hire, (ii) availability of apprenticeship and training positions, (iii) qualifications for each, (iv) name and location of the person(s) taking applications for each of the positions, and (v) the anticipated date the work shall begin.
D. The Contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in Section 3 Regulations and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulations in Section 3 Regulations. The Contractor will not subcontract with any subcontractor where the Contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in Section 3 Regulations.
E. The Contractor will certify that any vacant employment positions, including training positions, that are filled (i) after a contractor is selected but before the contract is executed, and (ii) with persons other than those to whom the regulations of Section 3 Regulations require employment 455
F15 Section 3 Regulations & Documents
opportunities to be directed, were not filled to circumvent the Contractor’s obligations under Section 3 Regulations.
F. Noncompliance with HUD's regulations in Section 3 Regulations may result in sanctions, termination of this Contract for default, and debarment or suspension from future HUD assisted contracts.
Section 3 Businesses (as defined by Section 3 Regulations) are encouraged to respond to this proposal.
Businesses that believe they meet the Section 3 criteria are encouraged to register as a Section 3 Business through HUD’s website: https://www.hudexchange.info/programs/section-3/resource-hub/businessowners/ Sample Section 3 Business and Employment Notice
[Instructions: Publish as a display advertisement in the local paper’s non-legal section or post at the local government and other Section 3 area locations.] (Insert local government name) is preparing to carry out the (insert Name of Project) with Community Development Block Grant (CDBG) funds. In the implementation of this project the following job types may be available:
(Insert List of Job Classifications to be used during project) All job openings will be posted at (local government office or list other posting locations). To the greatest extent feasible, employment and training positions will be made available to qualified persons who permanently reside in (Insert the County’s or local municipality name as Section 3 area). Persons qualified for the jobs listed should register at the following location:
(Insert Name and Address of posting locations and/or Other Locations) Additionally, the following contracts and procurements will/may be made and to the greatest extent feasible, businesses located in and owned by persons residing in (Insert the County’s name as Section 3 area) will be utilized:
(Insert list of construction, non-construction, and service contracts to be procured during the project. Also, insert list of construction subcontracts, major, specific equipment, and general types of materials to be used during the project.)
All above-referenced procurements will be made on a competitive basis. The names of businesses who respond to this notice will be included on procurement lists for this project. Names of job seekers will be given to contractors.
Any person residing or firm located in the above-named areas may request to participate in procurement opportunities associated with this project by contacting (Insert local government contact information) within ten (10) days of this notice. 456
F16 Section 3 Regulations & Documents
CONTRACTOR SECTION 3 PLAN
(Name of contractor) agrees to implement affirmative steps to comply with the Section 3 requirements set forth at 24 CFR 75 directed at increasing the utilization of lower income residents and businesses within the City or County of ________________________________.
A. To implement Section 3 requirements by seeking the assistance of local officials in determining the exact boundaries of the applicable project area.
B. To attempt to recruit from within the City/County the necessary number of lower income residents through local advertising media, signs placed at the proposed site for the project, and community organizations and public or private institutions operating within or serving the project area.
C. To maintain a list of all lower income residents who have applied either on their own or on referral from any source, and to employ such persons, if otherwise eligible and if a vacancy exits.
D. To insert this Section 3 plan in all bid documents, and to require all subcontract bidders to submit a Section 3 action plans (if subcontract is over $200,000) including utilization goals and the specific steps planned to accomplish these goals.
E. To ensure that all appropriate project area business concerns are notified of pending subcontractual opportunities.
F. To maintain records, including copies of correspondence, memoranda, etc., which document that all the above affirmative action steps have been taken.
G. To appoint or recruit an executive official of the company or agency as Equal Opportunity Officer to coordinate the implementation of this Section 3 plan.
H. To list and provide all permanent workforce for this project by job title.
I. To list and provide all projected workforce needs for this project by job classification and time frame for potential hire.
J. To ensure subcontractors comply with Section 3.
K. To provide to the City/County the necessary labor hour reports and support documentation.
As officers and representatives of ____________________We, the undersigned, have read and fully agree to the above and become a party to the full implementation of this program. _______________________________________ _____________________ Title Date
_________________________________________
Signature
457
F17 Section 3 Regulations & Documents
TARGETED SECTION 3 AND SECTION 3 WORKER TRACKING FORM
*This form must be submitted with each weekly payroll.
Name of Contractor/ Subcontractor
Contact Name
Daytime Phone Number & Email
Project Name & Project No.
Report Period
Name of Employee
Individual Identifying No. (e.g. last 4
digits of SS no.)
Worker
Classification
Targeted
Section 3
Workers
Section 3
Workers
Labor Hours
Worked
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Yes ☐ No ☐ Yes ☐ No ☐
Signature: Date Signed:
Print Name: Title:
458
F18 Section 3 Regulations & Documents
CONTRACTOR PERMANENT WORKFORCE FORM
This form is used to determine the Section 3 Workers already employed by the bidding contractor.
This form may be compared to Davis -Bacon Payrolls for cross referencing purposes.
Project Name: Name of Contractor:
Address: Date:
Employee Name
Job Title /
Worker
Classification
Certified
Section 3
Worker
Monthly Salary
Salary Below
80%of Median
Household
Income
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
Yes ☐ No ☐ $ Yes ☐ No ☐
I certify the above employees are permanent employees of ___________________________. I certify the above employees are on our regular monthly payroll and have their W-2 tax forms for our records. These records will be available to the city/county for the above referenced project for verification purposes. I understand that falsifying information is perjury and subject to legal ramifications.
Print Name: Signature: Date:
459
F19 Section 3 Regulations & Documents
SECTION 3 CONTRACTOR ESTIMATED PROJECT WORKFORCE BREAKDOWN *This form may be used to determine future hiring needs by the contractor.
Project Name: Name of Contractor:
Address: Date:
Job Category Total Estimated
Positions
No. of Persons
Currently
Occupied by
Permanent
Employees
No. of Vacant
Positions
No. of Positions to be
Filled with
Targeted and/or
Section 3 Workers
and Estimate of
Hire Date. (ex. 2 –
5/1/25)
Officials and
Managers
Professionals
Technicians
Office and
Clerical
Sales
Craft Workers
(Skilled)
Operatives
(Semi-Skilled)
Laborers
(Unskilled)
Apprentices
Service Workers
Others
Total
Print Name: Signature: Date:
460
F20 Section 3 Regulations & Documents
SECTION 3 BUSINESS SELF-CERTIFICATION FORM
To self-certify as a Section 3 Business your company/firm per 24 CFR 75, must meet one of the listed categories below. You must provide that supporting documentation with this form to be properly and completely confirmed as a Section 3 business.
Section 3 Business Category Additional Required Data
Mark an
“X” on
Your
Election
It is at least 51% owned by lowor very low-income persons; Proof of ownerships showing all owners and their percentages and a completed Section 3
Individual Self-Certification form for all low-and
very low-income owners.
☐
Over 75% of the labor hours
performed for the business are
performed by low- or very lowincome persons; or
Provide the last 90 days full payrolls for the
entire company, make a list of the names from
the payrolls of the Section 3 workers, and
provide a completed Section 3 Individual SelfCertification for all low- and very low-income workers you list.
☐
It is a business at least 51%
owned by current public
housing residents or residents
who currently live in Section 8-
assisted housing.
Proof of ownership showing all owners and their
percentages and a Section 3 Individual SelfCertification form for all public housing and/or Section 8 owners.
☐
I hereby certify to the US Department of Housing and Urban Development (HUD) that all the information on this form is true and correct. I attest under penalty of perjury that my business meets the elected definition and understand proof of this information may be requested. If found to be inaccurate, I understand that I may be disqualified as a certified Section 3 business.
Signature: Date Signed:
Print Name: Title:
Company Name:
Type of Business (check one): Corporation ☐ Partnership ☐ Sole Proprietorship ☐ Other ☐ Address:
Telephone:
461
F21 Section 3 Regulations & Documents
Section 3 Monthly Report Instructions
Contractors are required to complete and submit a Section 3 Monthly Report each month throughout the life of the project. Information reported is cumulative and should run through the last day of the reporting each month. Example: A report period of May 2025 will document required information from the start of the project through the last day of May 2025.
Reports are due by the 10th day of each month. Example: If the report period is May 2025, the Section 3 Summary Report is due June 10, 2025.
Part I: Employment and Training
Column A: Contains various job categories. Professionals are defined as people who have special knowledge of an occupation (i.e. architects, engineers, surveyors, planners, and computer programmers). For construction positions, list each trade and provide data in Columns B through F for each trade where persons were employed. The category of “Other” includes occupations such as services workers.
Column B: Enter the number of all new hires (throughout the life of the project) for each category of workers identified in Column A. New hire refers to a person who is not on the award recipient’s or contractor’s payroll for employment at the time of the selection for project award. Each new hire must complete a Section 3 Worker Certification Form to determine Section 3 status. The form must be completed once and submitted with the Section 3 Monthly Report during the month that the new hire appears.
Column C: Enter the number of Section 3 new hires (throughout the life of the project) for each category of workers identified in Column A. Section 3 new hires refers to a Section 3 worker who is not on the award recipient’s or contractor’s payroll for employment at the time of selection for the contact award.
Column D: Enter the percentage of all the staff hours of new hires (Section 3 workers) in connection with this contract.
Column E: Enter the percentage of the total staff hours worked for Section 3 employees and trainees. Include staff hours for part-time and full-time positions.
Column F: Enter the number of Section 3 workers who were trained in connection with this contract award.
Part II: Contracts Awarded
462
F22 Section 3 Regulations & Documents
Construction Contracts
Item A: Enter the total labor hours committed in all construction contracts awarded.
You may enter “0” if applicable.
Item B: Enter the total labor hours committed in construction contracts on this project awarded to Section 3 businesses for each Section 3 business reported, a Section 3 Business Form must be submitted. The form only needs to be completed and submitted once. You may enter “0” if applicable.
Item C: Enter the percentage of the total labor hours committed by Section 3 businesses. You may enter “0” if applicable.
Item D: Enter the number of Section 3 businesses receiving construction contacts.
You may enter “0” if applicable.
Non-Construction Contracts
Item A: Enter the total labor hours committed in all non-construction contracts awarded. You may enter “0” if applicable.
Item B: Enter the total labor hours committed in non-construction contracts awarded to Section 3 businesses. You may enter “0” if applicable.
Item C: Enter the percentage of the total labor hours committed by non-contracts awarded to Section 3 businesses. You may enter “0” if applicable.
Item D: Enter the number of Section 3 businesses receiving non-construction contacts. You may enter “0” if applicable.
Part III: Summary
Indicate which Section 3 outreach activities the recipient and its contractors performed prior to hiring new or contracting for the project.
463
F23 Section 3 Regulations & Documents
EQUAL EMPLOYMENT OPPORTUNITY, CIVIL RIGHTS AND SECTION 3
CERTIFICATION
(To Be Completed By General Contractor And All Subcontractors and Submitted with the Bid)
PROJECT NAME:
____________________________________________________________________ The undersigned, having submitted a bid for construction of the above identified project, certifies that he/she shall:
1. Comply with Title VI of the Civil Rights Act of 1964 as amended; Section 109 of Title I of the Housing and Community Development Act of 1974 as amended; Sections 502 and 504 of the Rehabilitation Act of 1973; the Americans with Disabilities Act of 1990; and the Age Discrimination Act of 1975 in that no person shall on the grounds of race, color, national origin, religion, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance.
2. Comply with Executive Orders 11375, 12086, and any other applicable federal anti-discrimination law in that no employee or applicant for employment shall be discriminated against because of race, color, creed, religion, ancestry, national origin, sex, sexual orientation, gender identity, disability or other handicap, age, marital/familial status, or status with regard to public assistance. Will take action to ensure that all employment practices are free from such discrimination. Such employment practices include but are not limited to the hiring, upgrading, demotion, transfer, recruitment or recruiting advertising, layoff, termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship.
3. Comply with Executive Orders 11625 and 12432 Concerning Minority Business Enterprise and Executive Order 12138 Concerning Women's Business Enterprise to ensure to the maximum extent possible the inclusion of minorities and women and entities owned by minorities and women in all subcontracts pursuant to the above contract.
4. Comply with Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 170lu) and the implementing regulations in 24 CFR Part 75 which requires to the greatest extent feasible that the training, employment and other economic opportunities arising in connection with the above identified project be given to low and very-low income persons residing within the local community and that contracts be awarded to eligible business concerns which employ and/or are owned in substantial part by such low and very-low income persons residing within the service area or neighborhood of the project and/or Stanislaus County.
464
F24 Section 3 Regulations & Documents
5. Furnish and cause each of its own subcontractors to furnish all information and reports required hereunder and permit access to its books, records and accounts by Stanislaus County, HUD or its agent, or other authorized Federal officials for purposes of investigation to ascertain compliance with the rules, regulations and provisions stated herein.
Contractor Name:
Signature/Title:
Federal I.D. or Social Security Number:
Date:
Intentionally Left Blank
465
F25 Section 3 Regulations & Documents
SECTION 3 BUSINESS CERTIFICATE OF ELIGIBILITY FOR
PREFERENCE
NOTE: This certificate must be signed by the person who will sign or has signed the Bid Form. This certificate will become a part of the contract documents. This form is a listing of Section 3 businesses that are planned to be a part of the project. If that is unknown or none apply, the form must still be completed.
Project Number: _______________________________ Bid Number: ____________ Project Name:
______________________________________________________________________ This is a formal certification that the below list of Section 3 Business(es) will be utilized on the above project and that such business(es) qualify for a Section 3 Business Preference and meet the requirements of a Section 3 Business as defined in the Bidding Procedures for this project.
a. Section 3 Business Name:
________________________________________________________________ Address:
________________________________________________________________ Description of Work:
________________________________________________________________ ________________________________________________________________ ________________________________________________________________ b. Section 3 Business Name:
________________________________________________________________ Address:
________________________________________________________________ Description of Work:
________________________________________________________________ ________________________________________________________________ ________________________________________________________________ 466
F26 Section 3 Regulations & Documents
c. Section 3 Business Name:
________________________________________________________________ Address:
________________________________________________________________ Description of Work:
________________________________________________________________ ________________________________________________________________ ________________________________________________________________ Total Hours of Proposed Work: ___________________________________________ The percentage of the total labor hours of all Section 3 Business work compared to the labor hour estimate: __________ %
• This certification is a material representation of the face upon which reliance may be placed if the proposed transaction is entered into. If it is later determined that an erroneous certification was rendered, in addition to other remedies available to the Federal Government, the U.S. Department of Housing and Urban Development and Stanislaus County may pursue available remedies.
• The undersigned contractor’s representative shall provide immediate written notice to the agency to which this proposal is submitted if at any time the undersigned learns that this certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
Contractor Name:
______________________________________________________
Signature/Title:
________________________________________________________ Date: __________________
467
F27 Section 3 Regulations & Documents
SECTION 3 MONTHLY REPORT
Company Name: Report Period (month/year):
Contact Name: Date Report Submitted:
Phone Number: Project Award Amount:
Project Name: Project Award Date:
Part I: Employment and Training
Job Category Number of
New Hires
Number of
Section 3
New Hires
% of Total
Number of Staff
Hours of Section
3 New Hires
% of Total Staff
Hours for
Section 3
Employees &
Number of Section 3
Trainees
Professionals
Technicians
Office/Clerical
Construction
by
Trade (list)
Trade:
Trade:
Trade:
Trade:
Other (list)
Totals
Final Report (check here): ☐ Signature: __________________________ 468
F28 Section 3 Regulations & Documents
Part II: Contracts Awarded Construction
Contracts
A. Total labor hours committed through all construction contracts on this project:
______________________
B. Total labor hours committed by Section 3 businesses: ______________________ C. Percentage of total labor hours performed by Section 3 businesses: ______ % Total number of Section 3 businesses receiving contracts: ______________________ Non-Construction Contracts
A. Total labor hours committed through all non-construction contracts:
______________________
B. Total labor hours committed by non-construction contracts awarded to Section 3 businesses:
_________
C. Percentage of labor hours performed by Section 3 businesses: ___________ % Total number of Section 3 businesses receiving contracts: ____________ Part III: Summary
Indicate the efforts made to direct the employment and other economic opportunities generated by HUD financial assistance for housing and community development programs, to the greatest extent feasible, toward low- to very-low-income persons, particularly those who are recipients of government assistance for housing. Check all that apply. ☐ Attempted to recruit low-income residents through: local advertising media, signs prominently displayed at the project site, contacts with community organizations and public or private agencies operating within the County/City in which the Section 3 covered program or project is located or similar methods.
☐ Participated in a HUD program or other program which promotes the training or employment of Section 3 businesses.
☐ Participated in a HUD program or other program which promotes the award of contracts to business concerns which meet the definition of Section 3 business concerns. ☐ Coordinated with Youth Build programs administered in the metropolitan area in which Section 3 covered project is located.
☐ Other: __________________________________________________________ I hereby certify that all information contained above is accurate, complete, and current to the best of my knowledge. I understand that if I do not submit a complete Section 3 Report by the 10th of each month as indicated in the instructions, City and/or Stanislaus County reserve the right to withhold payment until a completed Section 3 Summary Report is submitted. _____________________________________
Signature of the preparer Date
______________________________________
Print Name
469
F29 Section 3 Regulations & Documents
STANISLAUS COUNTY SECTION 3 PROCEDURES
As a recipient of U.S. Department of Housing and Urban Development (HUD) CDBG, HOME and other federal funds governed by Section 3 of the Housing and Urban Development Act of 1968, Stanislaus County is dedicated to contracting with Section 3 contractors to the greatest extent possible. Subsequently, the County is also dedicated to the utilization of MBE/WBE concerns.
SUBRECIPIENTS AND SECTION 3 REQUIREMENTS FOR COVERED CONTRACTS Stanislaus County shall insure that all sub-recipients are aware of the Section 3 requirements for all covered contracts that are bid and/or awarded during each fiscal year. This procedure will be carried out through two (2) specific activities associated with projects.
1. Section 3 language will be included within the contract between the subrecipient/municipal government and Stanislaus County.
2. Section 3 language will be included within the contract between the subrecipient/municipal government and the selected contractor.
SECTION 3 LANGUAGE FOR CONTRACTS
1. Contractor acknowledges and agrees to comply with Section 3 of the Housing and Urban Development Act of 1968, as found at 24 CFR Part 75.
A. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended,12 U.S.C. 1701u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing.
B. The parties to this contract agree to comply with HUD’s regulations in 24 CFR Part 75, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the Part 75 regulations.
C. The contractor agrees to send to each labor organizations or representative of workers with which the contractor has a collective bargaining agreement or other understanding. If any, a notice advising the labor organization or workers’ representative of the contractor’s commitments under this Section 3 clause and will post copies of the 470
F30 Section 3 Regulations & Documents
notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin.
D. The contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR parts 75, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulations in 24 CFR Part
75. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR Part 75.
E. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR Part 75 require employment opportunities to be directed, were not filled to circumvent the contractor’s obligations under 24 CFR Part 75.
F. Noncompliance with HUD’s regulations in 24 CFR Part 75 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.
G. With respect to work performed in connection with Section 3 covered Indian housing assistance, section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b) requires that to the greatest extent feasible (i) preference and opportunities for training and employment shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned Economic Enterprises. Parties to this contract that are subject to the provisions of
Section 3 and section 7(b) agree to comply with section 3 to the maximum extent feasible, but not in derogations of compliance with section 7(b).
PRE-CONSTRUCTION CONFERENCES
Section 3 requirements will be addressed at a pre-construction conference to further ensure that prospective contractors are aware of Section 3 and what it means to be a Section 3 contractor. The Pre-construction conference will cover the following:
471
F31 Section 3 Regulations & Documents
a. Certification of proposed contractors regarding Section 3 and segregated forms in the bid requirements for the contractor.
b. Explanation of Section 3 and the program requirements in the pre-construction meeting with the contractor.
SELF CERTIFICATION OF SECTION 3 CONTRACTORS
The County will use self-certification documentation to support whether or not a contractor qualifies as a Section 3 business concern.
This self-certification will used to identify whether a contractor is a Section 3 business concern and will be submitted by contractors asserting Section 3 status on a contractby-contract basis. When self-certifying, contractors should maintain records as documentation of any and all efforts made to ensure compliance with Section 3.
RECOMMENDATIONS TO CONTRACTORS ON MEETING SECTION 3
COMPLIANCE
The following are recommendations on how contractors can advertise and/or market to Section 3 residents on large scale construction projects and ensure compliance under Section 3.
1. Utilize the HUD Section 3 resources at:
https://www.hudexchange.info/programs/section-3/
The website includes a Section 3 resource hub that and resources for recipients of HUD funding, including a Guidebook, FAQs, training, and video series.
2. Prime and sub-contractors post any openings related to the contract on the job site.
3. Survey sub-contractors to determine Section 3 status/qualifications.
4. Insert Section 3 language in any contracts with sub-contractors (same wording as prime contractor’s amendment).
5. Provide a list of any new positions filled/hired to work on the project to-date and the County can help in determining if these new hires can be considered Section 3 Hires.
472
F32 Section 3 Regulations & Documents
TARGETED SECTION 3 WORKER SELF-CERTIFICATION FORM
A Section 3 Worker seeking the preference in training and employment provided by this part shall certify or submit evidence to the recipient contractor or subcontractor that the person is a Section 3 Worker, as defined in Section 24 CRF 75.
I________________________________________ (Print Name)
_____ My income for the previous year is below the income limit established by HUD.
A Section 3 business concern employs me.
_____ A YouthBuild participant
The status of a Section 3 worker shall not be negatively affected by a prior arrest or conviction.
Nothing in this part shall be construed to require the employment of someone who meets this definition of a Section 3 worker. Section 3 workers are not exempt from meeting the qualifications of the position to be filled.
Household Income Guidelines
2025 HUD ANNUAL HOUSEHOLD INCOME LIMITS (effective May 1, 2025) Select the statement that represents your household size, and from that statement, check the appropriate household size and annual income level for your household, as verified by Federal Income Tax Returns, W2s, Paycheck Stubs, or other documents.
Household Size Low-to Very Low Income Non-Low
Income
My household size is one, and my
annual income was ☐ $51,050 or Less ☐ More than
$51,050
My household size is two, and my
annual income was ☐ $58,350 or Less ☐ More than
$58,350
My household size is three, and
my annual income was ☐ $65,650 or Less ☐ More than
$65,650
My household size is four, and my
annual income was ☐ $72,900 or Less ☐ More than
$72,900
My household size is five, and my
annual income was ☐ $78,750 or Less ☐ More than
$78,750
My household size is six, and my
annual income was ☐ $84,600 or Less ☐ More than
$84,600
My household size is seven, and
my annual income was ☐ $90,400 or Less ☐ More than
$90,400
My household size is eight, and my
annual income was ☐ $96,250 or Less ☐ More than
$96,250
I hereby certify that the information provided by me is true and correct, and I understand that any falsification of any of the information could subject me to disqualification from participation and punishment under the law.
Signature: Date:
473
F33 Section 3 Regulations & Documents
SECTION 3 WORKER SELF-CERTIFICATION FORM
A Section 3 Worker seeking the preference in training and employment provided by this part shall certify or submit evidence to the recipient contractor or subcontractor that the person is a Section 3 Worker, as defined in Section 24 CRF 75.
I________________________________________ (Print Name)
_____ My income for the previous year is below the income limit established by HUD.
A Section 3 business concern employs me.
_____ A YouthBuild participant
The status of a Section 3 worker shall not be negatively affected by a prior arrest or conviction.
Nothing in this part shall be construed to require the employment of someone who meets this definition of a Section 3 worker. Section 3 workers are not exempt from meeting the qualifications of the position to be filled.
Household Income Guidelines
2025 HUD ANNUAL HOUSEHOLD INCOME LIMITS (effective May 1, 2025) Select the statement that represents your household size, and from that statement, check the appropriate household size and annual income level for your household, as verified by Federal Income Tax Returns, W2s, Paycheck Stubs, or other documents.
Household Size Low-to Very Low Income Non-Low
Income
My household size is one, and my
annual income was ☐ $51,050 or Less ☐ More than
$51,050
My household size is two, and my
annual income was ☐ $58,350 or Less ☐ More than
$58,350
My household size is three, and
my annual income was ☐ $65,650 or Less ☐ More than
$65,650
My household size is four, and my
annual income was ☐ $72,900 or Less ☐ More than
$72,900
My household size is five, and my
annual income was ☐ $78,750 or Less ☐ More than
$78,750
My household size is six, and my
annual income was ☐ $84,600 or Less ☐ More than
$84,600
My household size is seven, and
my annual income was ☐ $90,400 or Less ☐ More than
$90,400
My household size is eight, and my
annual income was ☐ $96,250 or Less ☐ More than
$96,250
I hereby certify that the information provided by me is true and correct, and I understand that any falsification of any of the information could subject me to disqualification from participation and punishment under the law.
Signature: Date:
474
Exhibit G
Section 3 Outreach Efforts Form
Please Note: Outreach Efforts to Section 3 Businesses: Applies to Projects of $100,000 or More Documentation of efforts to engage Section 3 businesses must be provided with responses to RFPs and grant applications.
Project Name:
This form is to be completed by bidders or applicants.
Organization: _______________________________________________________________________ Submitted By: ______________________________________________________________________ The following businesses identified as Section 3 were contacted to determine capacity and availability to work on the above-listed project:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
475
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
Company Name:
Telephone Number: E-Mail Address:
Date(s) Contacted: Quote Provided: Yes ☐ No ☐
Follow-Up Action and Company Response:
(Attach additional sheets if necessary)
476
Exhibit H
CERTIFICATION REGARDING LOBBYING
Certification for Contracts, Grants,
Loans, and Cooperative Contracts
The undersigned certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative Agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative Agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative Agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
(3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative Agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The Contractor, [ ], certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. Ch. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any. _________________________________________
Signature of Contractor’s Authorized Official
_________________________________________
Name and Title of Contractor’s Authorized Official
_____________
Date
IN WITNESS WHEREOF, Contractor agrees to the terms of this Addendum.
CONTRACTOR NAME:
By: _________________________ Date: _______________
[Name], [Title]
477
Exhibit I
I1
CONTRACTORS/SUBCONTRACTORS CERTIFICATION
FOR LABOR STANDARDS AND PREVAILING WAGE REQUIREMENTS
DAVIS BACON AND RELATED ACTS COMPLIANCE
Project Name: _______________________________ Project No.: ___________________
1. The undersigned, having executed a contract with __________________________ for the above-identified project, certifies that:
a. The Labor Standards Provisions of the Contract for Construction (HUD 4010) are included in the aforesaid contract;
b. Neither he nor any firm, corporation, partnership or association in which he has a substantial interest is designated as an ineligible contractor by the Comp General of the United States pursuant to Section 5.12 (a)(1) of the Regulations of the Secretary of Labor, Part 5 (29 CFR, Part 5), or pursuant to Section 3(a) the DavisBacon Act , as amended (40 U.S.C. 276a-2(a c. No part of the aforementioned contract has been or will be subcontracted to a subcontractor or any firm, corporation, partnership or association in which such subcontractor has a substantial interest in or is designated as an ineligible contractor pursuant to the aforesaid regulatory or statutory provisions.
2. The undersigned agrees to obtain and forward to the contractor for transmittal to the recipients within ten days after the execution of any lower subcontract, a Subcontractors Certification Concerning Labor Standards and Prevailing Wage Requirement, executed by the lower tier subcontractor, in duplicate.
a. The workers will report for duty on or about _________________________ (Date)
3. The undersigned certifies that:
a. The legal name and the business address of the undersigned are:
____________________________________________________________________ ____________________________________________________________________ b. The undersigned is (check one):
☐Single Proprietorship ☐A Partnership ☐A Corporation
☐Other - Describe: ________________________________________________ Signature Date
478
Exhibit I
I2
Project Wage Rate Sheet
Project Name: Wage Decision Number/Modification Number:
Project Number: Project County/City:
Federal Work
Classification
State Work
Classification
Basic
Hourly
Rate
(BHR)
Fringe
Benefits
Total
Hourly
Wage
Rate
Laborers Fringe
Benefits: $
Bricklayers $ $ Group # BHR Total Wage
Carpenters $ $ $ $
Cement Masons $ $ $ $
Drywall Hangers $ $ $ $
Electricians $ $ $ $
Iron Workers $ $ $ $
Painters $ $
Operators Fringe
Benefits: $
Plumbers $ $ Group # BHR Total Wage
Roofers $ $ $ $
Sheet Metal
Workers $ $ $ $
Soft Floor
Layers $ $ $ $
Tapers $ $ $ $
Tile Setters $ $
Truck Drivers
Fringe Benefits: $
Group # BHR
Total
Wage
$ $ $ $
$ $ $ $
$ $ $ $
Additional Classifications (HUD Form 4230-A)
Work
Classification
Basic Hourly
Rate
Fringe
Benefits
Total Hourly Wage
Rate
Date of HUD
Submission DOL
Date DOL
Approval
$ $
$ $
$ $
$ $
Other Classifications
479
STOP BAR
AND LEGEND
DETAIL 21 -
60 LF
STOP BAR
AND LEGEND
STOP BAR
AND LEGEND
STOP BAR
AND LEGEND
DETAIL 1 -
70 LF
DETAIL 21 -
60 LF
DETAIL 21 -
50 LF
DETAIL 21 -
50 LF
DETAIL 1 -
184 LF
DETAIL 21 -
50 LF
STANDARD CROSSWALK,
10' WIDE, WHITE (TYP)
STANDARD CROSSWALK,
10' WIDE, WHITE (TYP)
DETAIL 21 -
50 LF
STOP BAR
AND LEGEND
HIGH VISIBILITY CROSSWALK,
SEE DETAIL A, SHEET 2 (TYP)
HIGH VISIBILITY CROSSWALK,
SEE DETAIL A, SHEET 2 (TYP)
STANDARD CROSSWALK,
10' WIDE, WHITE (TYP)
45° DIAGONAL PARKING,
4" STRIPE, WHITE (TYP)
2x2 PARKING
LIMITS (TYP)
DETAIL 1 -
190 LF JOB NO. DATE SCALE DR. BY CK. BY FILE: HUGHSON/PUBLIC/24-C03 SHEET
OF SHEETS 24-C03 7/3/2025 AS SHOWN NSRM
6ENGINEERING PREPARED UNDER THE DIRECTION OF : NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26 w w w . m c r e n g . c o m MCR ENGINEERING, INC. 1242 DUPONT COURT MANTECA , CA 95336 TEL : FAX : ( 209 ) 239 - 6229 ( 209 ) 239 - 8839 DATE PLAN REVISIONS DATE NO. DESCRIPTIONS 2ND STREET SURFACE IMPROVEMENTS HUGHSON, CALIFORNIA 1234567
Know what'sbelow.
Callbefore you dig.
R
811 / 800-227-2600
0 0.5 MI.
NORTH
VICINITY MAP
IMPROVEMENT PLANS FOR:
2ND STREET SURFACE IMPROVEMENTS
CITY OF HUGHSON, CALIFORNIA NORTH
0 40
20 PINE STREET LOCUST STREET
HUGHSON AVENUE
1. CONTRACTOR SHALL PRESERVE AND PROTECT EXISTING
MONUMENTS, REFERENCED IN THESE IMPROVEMENT PLANS. IN
THE EVENT THAT A MONUMENT MUST BE REMOVED, CONTRACTOR
SHALL BE REQUIRED TO INSTALL A NEW MONUMENT BOX.
CONTRACTOR SHALL REQUEST MONUMENT STAKING 48 HOURS
PRIOR TO INSTALLATION OF NEW MONUMENT BOXES.
2. IF A MONUMENT IS DISCOVERED DURING CONSTRUCTION, THE
CONTRACTOR SHALL NOTIFY THE CITY ENGINEER IMMEDIATELY,
AND SHALL BE RESPONSIBLE FOR THE PRESERVATION OF THAT
MONUMENT.
MONUMENT PRESERVATION & STRIPING PLAN
MONUMENT PRESERVATION
SANTA FE AVENUE
1COVER SHEET
EX MONUMENT, SEE
PRESERVATION
NOTES (TYP)
# SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES
3 TOPOGRAPHY AND DEMOLITION PLAN
4 DIMENSION AND GRADING PLAN
5 EROSION CONTROL PLAN
PROJECT SITE
FOX RD
HATCH RD
SANTA FE AVE
WHITMORE AVE
LOCUST ST GEER RD TULLY RD
PROJECT LIMITS PROJECT LIMITS
1. QUANTITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE
RESPONSIBLE FOR FIELD VERIFICATION OF QUANTITIES AND BID ACCORDINGLY.
2. CONTRACTOR SHALL GRIND EXISTING THERMOPLASTIC STRIPING PRIOR TO SLURRY SEAL APPLICATION. SEE TECHNICAL
SPECIFICATIONS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
3. ALL PROPOSED STRIPING DETAILS, SYMBOLS, AND LEGENDS SHALL
BE THERMOPLASTIC UNLESS OTHERWISE INDICATED IN THESE
PLANS.
4. THE STRIPING SHOWN IN THESE PLANS AND DETAILS ARE THE INTENDED LAYOUT AND APPEARANCE. THE CONTRACTOR SHALL
REQUEST CLARIFICATION IF STRIPING DETAIL CALL OUTS DO NOT CORRESPOND WITH THE IMAGE SHOWN.
5. ALL STRIPING SHALL BE IN ACCORDANCE WITH THE CURRENT CALTRANS STANDARDS AND SPECIFICATIONS.
STRIPING NOTES
EX MONUMENT, SEE
PRESERVATION
NOTES (TYP)
EX MONUMENT, SEE
PRESERVATION
NOTES (TYP)
480
JOB NO. DATE SCALE DR. BY CK. BY FILE: HUGHSON/PUBLIC/24-C03 SHEET
OF SHEETS 24-C03 7/3/2025 AS SHOWN NSRM
6ENGINEERING PREPARED UNDER THE DIRECTION OF : NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26 w w w . m c r e n g . c o m MCR ENGINEERING, INC. 1242 DUPONT COURT MANTECA , CA 95336 TEL : FAX : ( 209 ) 239 - 6229 ( 209 ) 239 - 8839 DATE PLAN REVISIONS DATE NO. DESCRIPTIONS 2ND STREET SURFACE IMPROVEMENTS HUGHSON, CALIFORNIA 1234567
Know what'sbelow.
Callbefore you dig.
R
811 / 800-227-2600
2GENERAL NOTES
LEGEND
ITEM EXISTING
WATER VALVE
WATER METER
FIRE HYDRANT
WATER LINE
WATER HOSE BIB
AIR RELEASE VALVE
BLOWOFF
STORM MANHOLE
STORM DRAIN
DRAIN INLET
CURB INLET
SANITARY SEWER
SEWER MANHOLE
UTILITY POLE
SIGNAGE
TREE
CLEANOUT
TYPICAL ELECTROLIER
TYPICAL LUMINAIRE
ORIGINAL GROUND
ELECTRICAL VAULT
IRRIGATION BOX
SURVEY MONUMENT
8"W
W
E
IR
ELEVATION
DIRECTION OF FLOW
203.50TC
203.00P
40.00 CONTOUR (0.5' INTERVAL)
CURB, GUTTER & SIDEWALK
BARBED WIRE FENCE
WOOD FENCE
HB
PROPOSED
8"W
W
E
IR
203.50TC
203.00P
HB
N/A
N/A
N/A
PAVEMENT
TYPICAL RETURN WITH
HANDICAP RAMP
LINE STOP
8"SS
12"SD
8"SS
12"SD
MASONRY WALL
CHAIN LINK FENCE
GENERAL NOTES:
1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE FOLLOWING: CITY OF HUGHSON STANDARD SPECIFICATIONS, AND ALL
AMENDMENTS TO DATE, CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (CALTRANS, LATEST EDITION), WHERE APPLICABLE.
ALL WORK SHALL BE UNDER THE INSPECTION OF THE RESPECTIVE ENTITY.
2. IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS REQUIRE ALL LABOR
AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND
THAT THE WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY
REGARDING ANY DISCREPANCIES AND AMBIGUITIES WHICH MAY EXIST IN THE PLANS AND SPECIFICATIONS. IF THE PLANS OR SPECIFICATIONS DESCRIBE
PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS
UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED.
3. CONSTRUCTION STAKING FOR GRADING, CURB, GUTTER, SIDEWALK, SANITARY
SEWER, STORM DRAIN AND WATER SHALL BE DONE UNDER THE DIRECTION OF M.C.R. ENGINEERING. THE CONTRACTOR SHALL NOTIFY THE ENGINEER NINETY-SIX (96) HOURS IN ADVANCE OF THIS NEED FOR STAKING. ANY STAKING
REQUESTED BY THE CONTRACTOR OR HIS SUBCONTRACTORS THAT IS ABOVE
AND BEYOND NORMAL STAKING NEEDS, WILL BE SUBJECT TO AN EXTRA BACK CHARGE TO THE CONTRACTOR.
4. THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY
PRESERVE BENCH MARKS, REFERENCE POINTS AND ALL SURVEY STAKES, AND
SHALL BEAR ALL EXPENSE FOR REPLACEMENT AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR DISTURBANCE. ALL CENTERLINE AND/OR SURVEY MONUMENTS SHALL BE PRESERVED OR RESET AT THE END OF CONSTRUCTION.
5. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL
DEFEND, INDEMNIFY AND HOLD THE OWNER, ENGINEER AND THE CITY HARMLESS
FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
6. UNLESS OTHERWISE STATED, ALL STATIONS INDICATED ON THE IMPROVEMENT PLANS ARE REFERENCED TO THE CENTERLINE OF THE STREET. ALL STATIONS
OFF CENTER ARE PERPENDICULAR TO OR RADIALLY OPPOSITE CENTERLINE STATIONS, UNLESS OTHERWISE NOTED.
7. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTEN AUTHORIZATION FROM THE CITY ENGINEER.
8. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG MAN
OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY IN ACCORDANCE WITH THE CURRENT ISSUE OF "MANUAL OF TRAFFIC CONTROLS, WARNING SIGNS, LIGHTS AND DEVICES FOR USE IN PERFORMANCE OF WORK UPON HIGHWAY" PUBLISHED BY THE STATE OF CALIFORNIA BUSINESS AND TRANSPORTATION AGENCY.
9. THE OFFICE OF THE CITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS IN ADVANCE OF ANY WORK.
10. P.G.&E., TELEPHONE AND CABLE TV UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO CONSTRUCTION OF THE CURB, GUTTER, SIDEWALK AND PAVING.
11. THE CITY OF HUGHSON AND ASSOCIATED UTILITY COMPANY AND RESIDENCES TO
BE AFFECTED SHALL BE NOTIFIED IMMEDIATELY UPON ANY UTILITY SERVICE
DISRUPTION OTHER THAN SPECIFIED ON THESE IMPROVEMENT PLANS AND A MINIMUM 48 HOUR NOTICE SHALL BE GIVEN FOR ANY PLANNED DISRUPTION.
12. THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE CITY OF
HUGHSON, DEPARTMENT OF PUBLIC WORKS OR ANY OTHER APPLICABLE
AGENCIES PRIOR TO COMMENCEMENT OF WORK WITHIN EXISTING CITY RIGHT-OF-WAY. THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT
FROM STANISLAUS COUNTY PRIOR TO COMMENCEMENT OF WORK WITHIN EXISTING COUNTY RIGHT-OF-WAY. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL PERMITS AND LICENSES REQUIRED FOR THE CONSTRUCTION AND COMPLETION OF THE PROJECT.
13. STREET SIGNS, TRAFFIC CONTROL SIGNS, AND PAVEMENT MARKINGS SHALL BE
PROVIDED AND INSTALLED BY THE CONTRACTOR AT LOCATIONS ESTABLISHED BY THE ENGINEER. UNLESS NOTED OTHERWISE, PAVEMENT MARKINGS SHALL BE
REPLACED ACCORDING TO THE DETAILS OBSERVED IN THE ROAD PRIOR TO THE COMMENCEMENT OF WORK, ALL NEW MARKINGS SHALL BE THERMOPLASTIC.
14. ASPHALT CONCRETE SHALL BE PLACED ONLY WHEN THE ATMOSPHERIC TEMPERATURE IS ABOVE 50°F AND RISING.
15. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THE REMOVAL OR RELOCATION OF ALL EXISTING UTILITIES WITH RESPECTIVE UTILITY COMPANIES.
16. RURAL DRIVEWAY IMPACTED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL STATE. TEMPORARY DRIVEWAYS SHALL BE PROVIDED DURING THE INTERIM.
17. DRAWING NUMBERS SHOWN ON THE PLANS REFER TO DRAWINGS CONTAINED IN THE CITY OF HUGHSON STANDARD SPECIFICATIONS, THUS: (I.E. DWG. ST-18).
18. PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER (800) 227-2600. THE CONTRACTOR SHALL RECORD THE U.S.A. ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER PRIOR TO ANY EXCAVATION. IT SHALL BE THE
CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO
THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL BE REQUIRED TO
COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE DEVELOPMENT.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST OF REPLACING EXISTING IMPROVEMENTS
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS REQUIRING REMOVAL AND REPLACEMENT OF EXISTING IMPROVEMENTS.
20. WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK
COVERED BY THESE SPECIFICATIONS, THE PAVEMENT SHALL BE REPLACED,
AFTER PROPER BACKFIRING, WITH PAVEMENT MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE ORIGINAL PAVING. THE FINISHED PAVEMENT
SHALL BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER, OR CALTRANS, WHERE APPLICABLE.
21. PAYMENT FOR PAVEMENT WILL BE MADE ONLY FOR AREAS SHOWN ON THE PLANS
REPLACEMENT OF PAVEMENT WHICH IS BROKEN OR CUT DURING THE
INSTALLATION OF THE WORK COVERED BY THESE SPECIFICATIONS, AND WHICH
LIES OUTSIDE OF SAID AREAS, SHALL BE INDICATED IN THE CONTRACTOR'S UNIT
PRICE FOR PAVEMENT, AND NO ADDITIONAL PAYMENT SHALL BE MADE FOR SUCH WORK.
22. EXCAVATIONS OF 5 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATION PERMIT FROM THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY.
FOR TRENCHES 5 FEET OF MORE IN DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE CALTRANS STANDARDS, CHAPTER 9 OF THE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES.
23. WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540 (A) (1) OF THE CONSTRUCTION SAFETY ORDERS ISSUED BY THE
OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973 AS AMENDED WHICH STATES: (1) PRIOR TO OPENING AN EXCAVATION EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRICAL LINES, ETC., WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION
APPROACHES THE APPROXIMATE LOCATION OF SUCH INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING; AND,
WHEN IT IS UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF ACTUAL EXCAVATION.
24. ALL TRENCHES ON MAJOR AND COLLECTOR STREETS AND CROSS TRENCHES ON
ALL STREETS SHALL BE PAVED WITH TEMPORARY PAVING THE SAME DAY THE PAVEMENT CUT IS MADE. TRENCH PLATES MAY BE USED TEMPORARILY WITH PRIOR APPROVAL OF THE PROJECT ENGINEER.
25. APPROPRIATE DUST CONTROL SHALL BE PROVIDED, AT THE CONTRACTOR'S
EXPENSE TO MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF THE CITY OF HUGHSON.
26. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER, PRIOR TO FINAL
ACCEPTANCE, AS-BUILT DRAWINGS OF ALL IMPROVEMENTS REPRESENTED BY THE PROJECT PLANS AND SPECIFICATIONS.
27. AFTER CONSTRUCTION OF ALL IMPROVEMENTS, THE ENGINEER SHALL SUBMIT ONE SET OF REPRODUCIBLE PLANS. FINAL INVERT ELEVATIONS FOR SEWER AND
STORM DRAIN LINES THAT ARE TO BE EXTENDED FOR FUTURE CONSTRUCTION SHALL ALSO BE SHOWN ON THE "AS-BUILT" PLANS ALL AS PROVIDED TO THE ENGINEER BY THE CONTRACTOR.
28. THE CONTRACTOR SHALL NOTIFY MCR ENGINEERING AT LEAST 48 HOURS PRIOR
TO BACKFILLNG OF ANY PIPE WHICH STUBS TO A FUTURE PHASE OF CONSTRUCTION FOR INVERT VERIFICATION. TOLERANCE SHALL BE IN ACCORDANCE WITH THE CITY OF HUGHSON STANDARD SPECIFICATIONS.
29. REGULATING DISCHARGES OF STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM SOIL DISTURBANCES OF ONE (1) ACRE OR MORE, A NOTICE OF
INTENT (NOI) TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO
DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY MUST BE
FILED AND APPROPRIATE FEE PAID PRIOR TO COMMENCEMENT OF
CONSTRUCTION IN ADDITION, AT THE CONCLUSION OF THE PROJECT A NOTICE OF
TERMINATION MUST ALSO BE FILED, SUBMIT THE FEE, A NOTICE OF INTENT, AND
NOTICE OF TERMINATION TO THE STATE RESOURCES CONTROL BOARD AT THE FOLLOWING ADDRESS:
STATE WATER RESOURCES CONTROL BOARD
P.O. BOX 100
SACRAMENTO, CA 95812-0100
ATTN. STORM WATER PERMITTING SECTION
30. IF YOU HAVE ANY QUESTIONS CALL WATER QUALITY CONTROL ENGINEER,
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, CENTRAL VALLEY REGION AT (916) 464-3291.
31. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL BOARD (SWCRB) ORDER NO. 2009-0009-DWQ. THE
CONTRACTOR SHALL IMPLEMENT AND MONITOR A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH THE SWRCB REGULATIONS.
32. CONTRACTOR SHALL COMPLY WITH BUSINESS AND PROFESSIONS CODE, SECTION 8771 (b) REGARDING REFERENCING, PRESERVING, AND RECONSTRUCTING MONUMENTS, WHETHER OR NOT THE MONUMENTS ARE SHOWN ON THE PLANS.
GRADING NOTES:
1. EARTHWORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF HUGHSON STANDARDS. ALL FILL AREAS SHALL BE TESTED AS REQUIRED BY THE CITY OF HUGHSON AND SHALL BE PAID FOR BY THE CITY OF HUGHSON.
2. THE CITY SHALL BE RESPONSIBLE FOR COST OF INITIAL TEST FOR MOISTURE DENSITY CURVE. IF THE FIRST TEST FAILS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COST OF ALL SUBSEQUENT CURVES AND TESTS.
3. THE CONTRACTOR SHALL REVIEW SITE PRIOR TO BIDDING. ALL VEGETATION AND
DELETERIOUS MATERIALS, INCLUDING ROOTS SHALL BE REMOVED FROM THE SITE AT
THE EXPENSE OF THE CONTRACTOR AND SHALL BE INCLUDED IN THE LUMP SUM CLEARING COST.
4. THE CONTRACTOR SHALL PRESERVE ALL STAKES AND POINTS SET FOR LINES,
GRADES OR MEASUREMENT OF THE WORK IN THEIR PROPER PLACES UNTIL AUTHORIZED TO REMOVE THEM BY THE ENGINEER. ALL EXPENSES INCURRED IN
REPLACING STAKES THAT HAVE BEEN REMOVED WITHOUT PROPER AUTHORITY SHALL BE PAID FOR BY THE GENERAL CONTRACTOR.
5. CONTRACTOR SHALL OBTAIN 95% RELATIVE COMPACTION IN ALL GRADED AREAS.
WATER NOTES:
1. ALL WATER CONSTRUCTION, MATERIALS AND WORKMANSHIP SHALL BE IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF HUGHSON STANDARD SPECIFICATIONS AND PLANS.
2. THE CONTRACTOR SHALL EXPOSE EXISTING WATER LINES TO VERIFY EXISTING ELEVATION AND LOCATION PRIOR TO START OF CONSTRUCTION. ALL POTHOLE
INFORMATION SHALL BE PROVIDED TO THE CITY ENGINEER PRIOR TO THE COMMENCEMENT OF WORK.
3. ALL WATER LINES SHALL BE TESTED AND DISINFECTED IN CONFORMANCE WITH
THE REQUIREMENTS OF THE CITY OF HUGHSON AND THE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS, SECTION C-651.
4. CONTRACT PRICE SHALL INCLUDE FULL COMPENSATION FOR FURNISHING ALL
LABOR, MATERIALS, TOOLS, EQUIPMENT, AND INCIDENTALS, AND FOR DOING ALL OF THE WORK INVOLVED IN TESTING AND DISINFECTION OF THE WATER MAINS.
5. CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG MEN, OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY.
6. WATER LINES SHALL BE A MINIMUM OF 10 FEET OUTSIDE OF PIPE TO OUTSIDE OF PIPE FROM SEWER MAINS. CROSSINGS SHALL MEET STATE HEALTH STANDARDS.
7. ALL VALVE BOXES TO BE ADJUSTED TO FINISH GRADE AFTER PAVING. COST FOR RAISING FACILITIES TO BE INCLUDED IN UNIT PRICES FOR VALVES.
8. THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER
PROVISIONS NECESSARY TO PROTECT WORKMEN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 5' OR MORE. SAID PROTECTION TO BE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE CITY OF HUGHSON DEPARTMENT OF PUBLIC WORKS, AND STATE REGULATIONS.
9. ALL CONNECTIONS TO EXISTING CITY FACILITIES SHALL BE MADE IN THE PRESENCE OF THE CITY ENGINEER, OR HIS APPOINTED REPRESENTATIVE.
10. ALL MATERIALS THAT WILL COME IN CONTACT WITH POTABLE WATER SHALL COMPLY WITH NSF 61.
SANITARY SEWER NOTES:
1. ALL SANITARY SEWER CONSTRUCTION AND MATERIALS, SHALL BE IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF HUGHSON STANDARD DESIGNS OF COMMON ENGINEERING STRUCTURES.
2. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY.
3. THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER
PROVISIONS NECESSARY TO PROTECT WORKMAN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 5 FEET OR MORE. SAID PROTECTION TO BE DONE IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF HUGHSON DEPARTMENT OF PUBLIC WORKS, AND STATE REGULATIONS.
4. ALL MANHOLE RIMS TO BE ADJUSTED TO FINISH GRADE AFTER STREET PAVING, UNLESS OTHERWISE NOTED. COST FOR RAISING FACILITIES TO BE INCLUDED IN UNIT PRICES FOR MANHOLES.
5. THE CONTRACTOR SHALL EXPOSE ALL EXISTING SANITARY SEWER PIPES, WHERE
A CONNECTION IS TO BE MADE, AND NOTIFY THE ENGINEER IF THERE IS A
DISCREPANCY BETWEEN THE SIGNED PLANS AND THE EXISTING FIELD CONDITION PRIOR TO THE START OF CONSTRUCTION.
6. CONTRACTOR TO BE RESPONSIBLE FOR ALL TESTING OF SANITARY SEWER
FACILITIES IN ACCORDANCE WITH THE CITY OF HUGHSON STANDARD DESIGNS OF COMMON ENGINEERING STRUCTURES.
7. ALL SANITARY SEWER LINES SHALL BE CLEANED OF ALL SAND AND DEBRIS PRIOR TO ACCEPTANCE BY THE CITY OF WATERFORD.
8. CONTRACTOR SHALL INSTALL A "TRACE WIRE" ON ALL FORCE MAINS.
STORM DRAIN NOTES:
1. ALL STORM DRAIN CONSTRUCTION AND MATERIALS, SHALL BE IN ACCORDANCE WITH
THE REQUIREMENTS OF THE CITY OF HUGHSON STANDARD SPECIFICATIONS AND PLANS.
2. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY.
3. THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER
PROVISIONS NECESSARY TO PROTECT WORKMAN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 5 FEET OR MORE. SAID PROTECTION TO BE DONE IN ACCORDANCE
WITH THE REQUIREMENTS OF THE CITY OF HUGHSON DEPARTMENT OF PUBLIC WORKS, AND STATE REGULATIONS.
4. ALL NEW AND EXISTING MANHOLE RIMS TO BE ADJUSTED TO FINISH GRADE AFTER PAVING, UNLESS OTHERWISE NOTED. COST FOR RAISING FACILITIES TO BE INCLUDED IN UNIT PRICES FOR MANHOLES.
5. THE CONTRACTOR SHALL EXPOSE ALL EXISTING STORM DRAIN PIPES, WHERE A
CONNECTION IS TO BE MADE, AND NOTIFY THE ENGINEER IF THERE IS A
DISCREPANCY BETWEEN THE SIGNED PLANS AND THE EXISTING FIELD CONDITION PRIOR TO THE START OF CONSTRUCTION.
6. CONTRACTOR TO BE RESPONSIBLE FOR ALL TESTING OF STORM DRAIN FACILITIES IN
ACCORDANCE WITH THE CITY OF HUGHSON STANDARD SPECIFICATIONS AND PLANS
7. ALL STORM DRAIN LINES SHALL BE CLEANED OF ALL SAND AND DEBRIS PRIOR TO ACCEPTANCE BY THE CITY OF HUGHSON.
POLLUTION AND DUST NOTES:
1. THE CONTRACTOR SHALL KEEP THE WORK SITE FREE AND CLEAR OF RUBBISH AND DEBRIS.
2. THE CONTRACTOR SHALL EXERCISE CARE TO PRESERVE AND PROTECT NATURAL HABITAT ADJACENT TO THE PROJECT SITE.
3. THE CONTRACTOR SHALL NOT DISCHARGE SMOKE, DUST, OR ANY OTHER AIR
CONTAMINANTS INTO THE ATMOSPHERE IN SUCH A QUANTITY AS WILL VIOLATE THE REGULATIONS OF ANY LEGALLY CONSTITUTED AUTHORITY.
4. THE CONTRACTOR SHALL KEEP ALL AREAS GENERATING DUST WITHIN THE LIMITS OF THE PROJECT WELL WATERED DURING THE TERM OF THIS CONTRACT. THIS
INCLUDES BUT IS NOT LIMITED TO ACCESS RAMPS, THE HAUL ROADS, THE
EMBANKMENT FILL AREA, AND ANY OTHER AREAS THAT MAY GENERATE DUST AS A RESULT OF CONTRACTOR'S OPERATIONS. THE CONTRACTOR SHALL PROVIDE
DUST CONTROL MEASURES DURING EVENINGS, WEEKENDS, AND HOLIDAYS AT NO ADDITIONAL COST TO THE CITY.
5. THE CONTRACTOR(S) SHALL KEEP ALL PUBLIC ROADWAYS ADJACENT TO THE
PROJECT SITE FREE AND CLEAR OF MUD AND SILT DURING THE TERM OF THIS CONTRACT. THIS INCLUDES MUD CAUSED BY RAIN OR BY THE CONTRACTOR(S) WATERING PROCEDURES FOR DUST CONTROL.
6. THROUGHOUT ALL PHASES OF CONSTRUCTION, INCLUDING SUSPENSION OF
WORK, AND UNTIL FINAL ACCEPTANCE OF THE PROJECT, THE CONTRACTOR
SHALL KEEP THE PREMISES OCCUPIED BY HIM IN A CLEAN AND ORDERLY
CONDITION, DISPOSING OF REFUSE AND LITTER IN A MANNER SATISFACTORY TO THE CITY OF HUGHSON.
MITIGATION MONITORING AND REPORTING PROGRAM:
4.3-1: COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SJVAPCD REGULATION VIII (FUGITIVE DUST PROHIBITIONS).
4.3-2: THE PROJECT APPLICANTS SHALL INCORPORATE FEASIBLE EMISSION CONTROL
MEASURES INTO THE PROJECT DESIGN AND OPERATION AS DETERMINED APPROPRIATE BY T HE CITY. SUCH MEASURES MAY INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING ITEMS AS RECOMMENDED IN THE SJVAPCD GUIDE FOR ASSESSING AND MITIGATING AIR QUALITY IMPACTS (SJVAPCD 2002) AND OTHER SOURCES.
4.3-3: IMPLEMENT MEASURES TO REDUCE EXPOSURE OF SENSITIVE RECEPTORS TO TAC EMISSIONS.
4.3-4: PRIOR TO THE START OF PROJECT CONSTRUCTION, THE CONTRACTOR SHALL
DEVELOP AND IMPLEMENT A TRAFFIC CONTROL PLAN (TCP) FOR ALL
ROADWAYS AND AT THE COBBLES CORNER AND COUNTRY VILLA APARTMENTS RESIDENTIAL AREAS. THE TCP SHALL INCLUDE SUCH ITEMS AS TRAFFIC
CONTROL REQUIREMENTS, RESIDENT NOTIFICATION OF ACCESS CLOSURE, AND DAILY ACCESS RESTORATION. THE CONTRACTOR SHALL SPECIFY DATES
AND TIMES OF ROAD OR ACCESS CLOSURES OR RESTRICTIONS, IF ANY, AND
SHALL ENSURE THAT ADEQUATE ACCESS WILL BE PROVIDED FOR EMERGENCY VEHICLES AND RESIDENTS. THE TCP SHALL BE REVIEWED AND APPROVED BY
THE CITY'S DEPARTMENT OF PUBLIC WORKS AND SHALL BE COORDINATED
WITH THE HUGHSON FIRE PROTECTION DISTRICT, THE HUGHSON POLICE DEPARTMENT, AND THE STANISLAUS COUNTY SHERIFF'S DEPARTMENT.
4.3-5: THE FOLLOWING MEASURES SHALL BE INCORPORATED INTO THE PROJECT PLANS AND SPECIFICATION: · ALL CONSTRUCITON EQUIPMENT POWERED BY INTERNAL COMBUSTION ENGINES SHALL BE PROPERLY MUFFLED AND MAINTAINED. MUFFLERS
SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
SPECIFICATIONS. · IN ACCORDANCE WITH STATE REGULATIONS, CONSTRUCTION EQUIPMENT
WITH INTERNAL COMBUSTION ENGINES SHALL BE PROHIBITED FROM IDLING MORE THAN FIVE MINUTES. · THE CONSTRUCTION CONTRACTOR SHALL, TO THE MAXIMUM EXTENT
PRACTICAL, LOCATE ON-SITE EQUIPMENT STAGING AREAS TO MAXIMIZE
THE DISTANCE BETWEEN CONSTRUCTION-RELATED NOISE SOURCES AND
NOISE-SENSITIVE RECEPTORS NEAREST THE PROJECT SITE DURING ALL PROJECT CONSTRUCTION.
SS SANITARY SEWER
WS
W
THRU
TI
TPE
TYP.
S
TEMP
TC
WATER SERVICE
WATER
TREE PLANTING EASEMENT
THROUGH
TRAFFIC INDEX
TYPICAL
TEMPORARY
TOP OF CURB
SEWER
PT
SHT
SNS
STD
SW
STA
PUE
PVC
RCP
RET
R
OG
P
PL
PRC
PP
MH
MIN
NTS
POINT
PUBLIC UTILITY EASEMENT
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
STANDARD
SIDEWALK
STREET NAME SIGN
SHEET
STATION
RETURN
RADIUS
ORIGINAL GROUND / GRADE
POINT OF REVERSE CURVATURE
PROPOSED
POWER POLE
PROPERTY LINE
MAINTENANCE HOLE
NOT TO SCALE
MINIMUM
E, EX, OR EXIST
HP
HPS
INV
IRR
LF
FH
GB
FL
D OR SD
EC
ELEV
ESMT
GV
EP
DIA
DW
DIP
EXISTING
HIGH PRESSURE SODIUM
LINEAL FEET OR LINEAR FEET
HIGH POINT
IRRIGATION
INVERT
FIRE HYDRANT
GRADE BREAK
FLOW LINE
DRAIN OR STORM DRAIN
EDGE OF PAVEMENT
GATE VALVE (WATER)
DUCTILE IRON PIPE
END OF CURVE
ELEVATION
EASEMENT
DIAMETER
DRIVEWAY
AC
C & G
CL
CO
CONC
BC
BSL
BV
BDRY
@
AB
ASPHALT CONCRETE
BUILDING SET BACK LINE
BUTTERFLY VALVE (WATER)
CENTER LINE
CLEAN OUT
CONCRETE
BEGINNING OF CURVE
CURB AND GUTTER
BOUNDARY
AGGREGATE BASE
AT
CI CURB INLET
SD STORM DRAIN
MAX MAXIMUM
LP LOW POINT
CR CURB RETURN
U.N.O. UNLESS NOTED OTHERWISE
ADA AMERICAN DISABILITIES ACT
± PLUS OR MINUS (NOT EXACT)
ABBREVIATION LIST
2.00% 2.00%
NOTES:
1. HIGH VISIBILITY LADDER CROSSWALK SHALL COMPLY WITH
CALTRAN'S 2023 STANDARD PLAN A24F.
2. EXISTING STRIPING SHALL BE REMOVED PRIOR TO
PLACEMENT OF NEW STRIPING.
3. SPACES BETWEEN MARKINGS SHALL BE PLACED IN WHEEL
TRACKS OF EACH LANE.
4. CROSSWALK MARKINGS SHALL BE WHITE UNLESS OTHERWISE
INDICATED ON THE PLANS.
5. THE HIGH VISIBILITY CROSSWALK MARKINGS PATTERN SHALL BE 10 FT WIDE, 2.0 FT WIDE AND 2.0 FT SPACING. START
PLACING FIRST LINE ±6 INCHES INSIDE THE EDGE OF
PAVEMENT.
2' (TYP) 1' (TYP) 10'
2' (TYP)
A
2 HIGH-VISIBILITY
LADDER CROSSWALK
N.T.S.
481
122.72
122.59
122.65
122.62
122.37
122.32
123.42
123.25
123.31
122.42
122.51
123.35
123.24
122.72
122.67
122.64
122.50
122.22
121.91
121.98
122.13
122.43
122.58
122.56
122.31122.19122.22
122.52122.32
122.35
122.46
122.54
122.59
123.25
122.00121.74
121.84122.03
122.37122.55
122.14121.98
122.05
122.05
122.38
122.68
122.53
122.13
122.08
122.46
122.74
122.17 122.12122.49 122.46
122.60
122.57
122.60
122.46
122.70
121.86
121.94
122.25
122.60
122.13
121.89
122.32
121.94
122.05
121.84
121.14
120.81
120.95
121.14
121.44
121.95
121.88
121.67
121.52
121.80
121.46
121.70
120.78
121.83
119.73
119.74
120.04
119.73 119.74 119.82
120.30
120.62
121.03
119.85
120.48
119.54
119.93
120.04
119.76
119.96
120.54
121.12
120.51
120.50
120.50
120.11
120.15
119.88
120.05
120.34
119.85
121.42
121.22
119.10
119.13
119.39 119.41
119.40
119.52
119.51
119.20
119.24
119.26
119.24
118.93 118.97
119.34
119.42
118.96
119.32
119.63
119.28
119.41
119.24
118.94
118.95
119.30
118.98
119.38
119.43
119.32
119.27
119.38
119.01
119.24
119.60
119.33
119.23
119.70
119.71
119.56
119.44
119.55
119.47
119.28
119.66
119.28
119.48
119.69
119.30
119.47
119.91
119.59
119.60
119.17 119.29 119.45119.51
119.45
119.79
119.52
118.98
119.74 119.66
119.62
120.14
120.39
120.31
120.62
120.55
121.00
120.33
119.76119.66 119.28
119.27
119.27
119.38 119.63
119.63
46.9' 23.5' REMOVE & REPLACE
FIRE HYDRANT
AND BOLLARDS
91.5'
SDMH
RIM=120.24
24"INV=112.52(SE)
16"INV=112.74(NE)
SDCB
TC=119.27
15"INV=114.98(N)
SDMH
RIM=119.50
15"INV=113.86(S)
15"INV=113.88(E)
15"INV=113.89(N)
SDCB
TC=119.80
15"INV=114.33(S)
15"SD
8"W
8"SS 12"SS
SSMH
RIM=119.67
8"INV= 112.66(N)
8"INV= 112.70(E)
SSMH
RIM=120.40 12"SS 8"SS
6"SS
XX"SS 21"SD 15"SD
30.8' 26.2' 32.1'
22.5' 55.3'
SSMH
RIM=123.15
12"INV=112.58(N)
12"INV=112.39(E)
12"INV=112.17(S)
8"INV=113.73(W)
6"INV=115.14(E)
DEMO EX CURB, GUTTER,
AND SIDEWALK
PAVEMENT
DEMO LIMITS
DEMO EX CURB
RETURN (TYP)
DEMO EX CURB
RETURN (TYP)
DEMO EX CURB
RETURN (TYP)
DEMO EX CURB
RETURN (TYP)
DEMO EX DRIVEWAY,
CURB, AND GUTTER
DEMO EX
CURB, GUTTER,
AND SIDEWALK
REMOVE EX TREE
REMOVE EX TREE
DEMO EX DRIVEWAY,
CURB, AND GUTTER
123.11
123.30
122.99
122.91
123.15
122.96
122.56 122.54
122.89
122.52122.84
122.59
122.49
122.05
122.48
122.40
122.38
122.18
122.11
122.52
122.76
122.67
122.62
122.67
122.32
122.45
122.51 122.47
121.93
122.29
122.46
122.34
121.91
121.84
121.90
121.93122.33122.22
122.43
121.89
121.97
122.05
122.46122.53
122.66
122.75
122.47
121.99
121.95
121.76
122.56
121.76
121.98
122.54
121.79
122.14
122.28
122.22
121.96
122.14
121.81
121.83
121.64
122.31
122.70
122.36
121.70
121.82121.73
122.04
122.45
121.78
121.65
121.83
122.03
122.09
121.95
121.84
122.20
122.69
122.31
121.59
121.74
122.05
122.12
121.67
121.77
121.85
122.41
122.32
121.64
121.48
122.11
122.42
122.08
121.41
121.59
121.82
121.54 121.50 121.15 121.18 121.31 121.57121.42 121.33 120.98 121.08 121.25 121.40 121.009 121.10 121.26 121.47 121.59 121.27 121.22 121.28 121.62
121.93
121.90
122.11
122.14 122.01
121.66
121.88
121.41
122.01 121.99 122.28 121.88 121.79
121.68
121.83 121.44 121.38 121.40 121.83
121.89
122.18
121.99
121.92 122.82
123.35
122.85
122.09 122.09
122.00
122.17
122.87
122.21
121.90
121.85
121.59121.18121.20121.62
121.66
121.78
121.39
121.37
122.32 121.85
122.62
122.07
122.89
122.18 122.08 122.08
122.30
122.29121.88
121.80
121.81122.16
122.65 122.72 122.59 122.65
122.62
122.37
122.32
122.15
122.60
123.23
122.36
122.16
123.49 123.14
123.28
122.29
122.22
123.27 123.30 123.34
122.24122.19
123.31 123.21
123.39 123.46 123.46
123.37
122.36122.40
123.26 123.42 123.46
123.25 123.31
122.42
122.51
123.35 123.24 122.72
122.67122.64
122.50
122.30
122.53
123.32
122.22
122.52122.32
123.25
122.05
122.05122.38
122.68
122.53
122.08
122.46
122.57
122.60 122.70
123.12
REMOVE & REPLACE
FIRE HYDRANT
AND BOLLARDS
SDMH
RIM=121.38
8"INV=119.55(S)
SDMH
RIM=121.37
8"INV=119.04(E)
SDMH (FILLED)
RIM=121.44
SDMH
RIM=121.78
8"INV=119.38(NE)
SDMH
RIM=121.97
12"INV=115.47(N)
12"INV=115.49(E)
12"INV=115.44(SE)
24"INV=115.04(W)
12"SD
8"W 8"W 6"W 6"W
12"SS 12"SS
4"SS
SSMH
RIM=122.48
12"INV=112.30(N)
12"INV=112.36(S)
4"INV=117.70(NE)
SSMH
RIM=123.12 24"SD
12"SD
SDDI
RIM=121.26
15"INV=118.53(NW)
SDDI
RIM=121.01
12"INV=117.85(W)
8"INV=118.83(E)
SDDI
RIM=121.16
12"INV=117.63(S)
12"INV=117.68(W)
8"INV=118.67(E)
SDDI
RIM=121.30
12"INV=116.93(NW)
8"INV=118.50(SW)
DEMO EX CURB
RETURN (TYP)
DEMO EX CURB
AND GUTTER
(33 LF)
DEMO EX CURB
RETURN (TYP)
DEMO EX CURB
RETURN (TYP)
REMOVE AND
REPLACE SDDI
REMOVE AND
REPLACE SDDI
REJUVANATE EX DRYWELL,
REMOVE AND REPLACE
FRAME AND GRATE
REMOVE AND
REPLACE SDDI
RELOCATE EXISTING FENCE
TO PROPOSED BACK OF WALK
REJUVANATE EX DRYWELL,
REMOVE AND REPLACE
FRAME AND GRATE
REMOVE AND
REPLACE SDDI
REJUVANATE EX DRYWELL,
REMOVE AND REPLACE
FRAME AND GRATE 12"SD JOB NO. DATE SCALE DR. BY CK. BY FILE: HUGHSON/PUBLIC/24-C03 SHEET
OF SHEETS 24-C03 7/3/2025 AS SHOWN NSRM
6ENGINEERING PREPARED UNDER THE DIRECTION OF : NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26 w w w . m c r e n g . c o m MCR ENGINEERING, INC. 1242 DUPONT COURT MANTECA , CA 95336 TEL : FAX : ( 209 ) 239 - 6229 ( 209 ) 239 - 8839 DATE PLAN REVISIONS DATE NO. DESCRIPTIONS 2ND STREET SURFACE IMPROVEMENTS HUGHSON, CALIFORNIA 1234567
Know what'sbelow.
Callbefore you dig.
R
811 / 800-227-2600
3TOPOGRAPHY AND DEMOLITION PLAN
TOPOGRAPHY & DEMOLITION PLAN
1. THE LOCATION OF EXISTING UTILITIES ARE SHOWN FROM RECORD DRAWINGS & FIELD SURVEY INFORMATION. PRIOR TO
CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES INCLUDING THOSE NOT SHOWN ON THESE PLANS.
NOTIFY THE ENGINEER OF ANY DISCEPANCIES OR CONFLICTS AS SOON AS ENCOUNTERED. POT HOLE EXISTING UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH DISTRICT
STAFF TO DETERMINE IF UTILITIES CAN BE REMOVED OR IF THEY NEED TO BE RE-ROUTED.
2. UNLESS OTHERWISE IDENTIFIED ALL EXISTING FACILITIES SHOWN IN
THE TOPOGRAPHIC AND DEMO PLAN ARE TO BE PRESERVED AND
PROTECTED DURING CONSTRUCTION. CONTACT DESIGN ENGINEER IF
FACILITIES SHOWN TO REMAIN COME IN CONFLICT WITH PROPOSED IMPROVEMENTS.
3. ALL EXISTING UTILITIES WERE PLOTTED FROM RECORD INFORMATION AND FIELD TOPOGRAPHY. ACTUAL LOCATIONS MAY VARY AND
ADDITIONAL CROSSINGS MAY EXIST IN THE FIELD. IT IS IMPERATIVE THAT "U.S.A." LOCATION SERVICES ARE LOCATED AND MARKED
PRIOR TO START OF EXCAVATION.
4. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN EXPOSING EXISTING UTILITY CROSSINGS AND SERVICES.
5. ANY DAMAGE TO EXISTING UTILITIES WILL BE SOLE RESPONSIBILITY OF THE CONTRACTOR.
6. ANY DAMAGE TO EXISTING SIDEWALK, CURB OR GUTTER WILL BE
SOLE RESPONSIBILITY OF THE CONTRACTOR, WITH REPLACEMENT TO BE DETERMINED BY THE ENGINEER.
7. CONTRACTOR SHALL ADJUST EXISTING MANHOLE RIMS, WATER VALVES, AND MONUMENT BOXES TO FINISH GRADE.
8. ALL SAWCUTS SHALL BE MADE AT EXISTING EXPANSION OR
WEAKENED PLANE JOINTS WITH APPROVAL PENDING CITY
REPRESENTATIVE.
DEMO EXISTING PAVEMENT
DEMO EXISTING CONCRETE
SAWCUT LINE
NOTES LEGEND MATCH LINE: SEE ABOVE PROJECT LIMITS MATCH LINE: SEE BELOW PROJECT LIMITS NORTH 0 20
10 PINE STREET LOCUST STREET
HUGHSON AVENUE
SANTA FE AVENUE
482
SDCB
TC=119.27
15"INV=114.98(N)
SDMH
RIM=119.50
15"INV=113.86(S)
15"INV=113.88(E)
15"INV=113.89(N)
21"INV=113.82(W)
SDCB
TC=119.80
15"INV=114.33(S)
SDMH
RIM=121.38
8"INV=119.55(S)
SDMH
RIM=121.37
8"INV=119.04(E)
SDMH (FILLED)
RIM=121.44
SDMH
RIM=121.78
8"INV=119.38(NE)
SDMH
RIM=121.97
12"INV=115.47(N)
12"INV=115.49(E)
12"INV=115.44(SE)
24"INV=115.04(W)
15"SD
12"SD
8"W 8"W
8"SS 12"SS 12"SS
4"SS SSMH
RIM=120.40
SSMH
RIM=122.48
12"INV=112.30(N)
12"INV=112.36(S)
4"INV=117.70(NE) 12"SS 8"SS 6"SS XX"SS 21"SD 15"SD 24"SD 12"SD
SSMH
RIM=123.15
12"INV=112.58(N)
12"INV=112.39(E)
12"INV=112.17(S)
8"INV=113.73(W)
6"INV=115.14(E) 12"SD
SDCB (7-SD.3)
RIM=121.26
15"INV=118.53(NW)
SDCB (7-SD.3)
RIM=121.01
8"INV=118.83(E)
12"INV=117.85(W) 6"FIRE
INSTALL NEW CHRISTY B-30
WATER METER BOX
INSTALL NEW CHRISTY B-30
WATER METER BOX
INSTALL NEW CHRIST B-30
WATER METER BOX
SDCB (7-SD.3)
RIM=121.30
8"INV=118.50(SW)
12"INV=116.93(NW)
SDCB (7-SD.4)
RIM=121.16
8"INV=118.67(E)
12"INV=117.63(S)
12"INV=117.68(W) JOB NO. DATE SCALE DR. BY CK. BY FILE: HUGHSON/PUBLIC/24-C03 SHEET
OF SHEETS 24-C03 7/3/2025 AS SHOWN NSRM 6ENGINEERING PREPARED UNDER THE DIRECTION OF : NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26 w w w . m c r e n g . c o m MCR ENGINEERING, INC. 1242 DUPONT COURT MANTECA , CA 95336 TEL : FAX : ( 209 ) 239 - 6229 ( 209 ) 239 - 8839 DATE PLAN REVISIONS DATE NO. DESCRIPTIONS 2ND STREET SURFACE IMPROVEMENTS HUGHSON, CALIFORNIA 1234567 Know what'sbelow.
Callbefore you dig. R
811 / 800-227-2600 4COMPOSITE UTILITY PLAN
COMPOSITE UTILITY PLAN UTILITY PLAN LIMITS UTILITY PLAN LIMITS NOTES
1. ALL EXISTING UTILITIES WERE PLOTTED FROM RECORD INFORMATION AND FIELD TOPOGRAPHY. ACTUAL LOCATIONS MAY VARY AND
ADDITIONAL CROSSINGS MAY EXIST IN THE FIELD. IT IS IMPERATIVE THAT "U.S.A" LOCATING SERVICES LOCATE AND MARK UTILITIES PRIOR TO THE START OF EXCAVATION.
2. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN EXPOSING EXISTING UTILITY CROSSINGS AND SERVICES. ANY DAMAGE TO
EXISTING UTILITIES WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. ANY DAMAGE TO EXISTING SIDEWALK, CURB OR GUTTER WILL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR, WITH REPLACEMENT TO BE DETERMINED BY THE ENGINEER.
4. ALL SAWCUTS OR REMOVAL LIMITS SHALL BE MADE AT EXISTING
EXPANSION OR WEAKENED PLANE JOINTS AND APPROVAL BY THE
ENGINEER.
5. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW G-05'S FOR ALL EXISTING MONUMENTS AND EXISTING WATER VALVES. ALL VALVE AND MONUMENT BOXES SHALL BE ADJUSTED TO FINISHED GRADE.
6. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW STORM DRAIN
AND SEWER MANHOLE FRAME AND GRATES FOR ALL MANHOLES
WITHIN THE PROPOSED PAVING LIMITS. ALL FRAME AND GRATES SHALL BE ADJUSTED TO FINISHED GRADE.
PINE STREET 0 20
10 NORTH
483
VERTICAL CURB, GUTTER,
AND SIDEWALK PER
STD DWG 3-C.3 (TYP)
PEDESTRIAN RAMP
TC RADIUS = 20'
PEDESTRIAN RAMP
MODIFIED CASE "D" (3-HC.2)
TC RADIUS = 20'
PEDESTRIAN RAMP
MODIFIED CASE "D" (3-HC.2)
TC RADIUS = 20'
PEDESTRIAN RAMP
MODIFIED CASE "D" (3-HC.2)
TC RADIUS = 20'
COMMERCIAL DRIVEWAY
WITH 3' WINGS (TYP)
SLURRY LIMITS
SLURRY LIMITS
SLURRY LIMITS
INSTALL NEW
FIRE HYDRANT
AND BOLLARDS
INSTALL REINFORCED
6" DW, CURB,
AND GUTTER
COMMERCIAL DRIVEWAY
WITH 3' WINGS (TYP)
COMMERCIAL DRIVEWAY
WITH 3' WINGS (TYP)
COMMERCIAL DRIVEWAY
WITH 3' WINGS (TYP)
BLENDED TRANSITION 1.50%
0.11% 0.11% 7.85% 4.89%
±119.2
MA
±119.4
MA
±119.0
MA
±119.9
MA
±119.3
MA
±119.5
MA
±120.7
MA
±121.0
MA
±119.0
±119.2 MA
MA
±119.4
MA
±120.0
MA
±119.5
MA
±120.3
MA
±120.6
MA
±119.7
MA
±119.6
MA
±119.3
MA
±119.6
MA
±119.2
MA
±122.3
MA
±119.7
MA
±119.5
MA
±119.5
MA
±119.5
MA
±122.2
MA
±122.5
MA
122.11FL
122.61TC
122.08FL
122.58TC
122.42
C
122.616
TC-HP
122.41
C
±120.4
CR
119.79
CR
±119.4
CR
0.42% 0.46% 2.27% 2.60%
119.67
RIM
119.69
TC-HP
.045
.028
.005
.005
±122.5
MA
±122.6
MA
±122.4
MA
±122.0
MA
±121.5
MA
±121.1
MA
119.91
CR
SIDEWALK PER
STD DWG 3-C.3 (TYP)
SIDEWALK PER
STD DWG 3-C.3
(TYP)
PEDESTRIAN RAMP
CASE "C" (3-HC.2)
TC RADIUS = 18'
PEDESTRIAN RAMP
CASE "C" (3-HC.2)
TC RADIUS = 18'
PEDESTRIAN RAMP
CASE "C" (3-HC.2)
TC RADIUS = 18'
PEDESTRIAN RAMP
CASE "C" (3-HC.2)
TC RADIUS = 18'
SIDEWALK PER
STD DWG 3-C.3 (TYP)
INSTALL NEW
FIRE HYDRANT
AND BOLLARDS
SLURRY LIMITS
SLURRY LIMITS
SLURRY LIMITS
±121.8
MA
±121.8
MA
±122.0
MA
±122.0
MA
±121.3
MA
±121.8
±121.4 MA
MA
±121.7
MA
±121.8
MA
±121.4
MA
±121.6
MA
±121.7
MA
±121.1
MA
±121.9
MA
±121.8
MA
±121.8
MA
±122.3
MA
±122.2
MA
±122.3
MA
±122.5
MA
±122.3
MA
121.78
RIM
121.97
RIM .011
.010
.006
.011
±121.9
MA
±122.5
MA JOB NO. DATE SCALE DR. BY CK. BY FILE: HUGHSON/PUBLIC/24-C03 SHEET
OF SHEETS 24-C03 7/3/2025 AS SHOWN NSRM
6ENGINEERING PREPARED UNDER THE DIRECTION OF : NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26 w w w . m c r e n g . c o m MCR ENGINEERING, INC. 1242 DUPONT COURT MANTECA , CA 95336 TEL : FAX : ( 209 ) 239 - 6229 ( 209 ) 239 - 8839 DATE PLAN REVISIONS DATE NO. DESCRIPTIONS 2ND STREET SURFACE IMPROVEMENTS HUGHSON, CALIFORNIA 1234567
Know what'sbelow.
Callbefore you dig.
R
811 / 800-227-2600
5DIMENSION AND GRADING PLAN
DIMENSIONS AND GRADING PLAN MATCH LINE: SEE ABOVE PROJECT LIMITS MATCH LINE: SEE BELOW PROJECT LIMITS NOTES
1. ALL EXISTING UTILITIES WERE PLOTTED FROM RECORD INFORMATION AND FIELD TOPOGRAPHY. ACTUAL LOCATIONS MAY VARY AND
ADDITIONAL CROSSINGS MAY EXIST IN THE FIELD. IT IS IMPERATIVE THAT "U.S.A" LOCATING SERVICES LOCATE AND MARK UTILITIES PRIOR TO THE START OF EXCAVATION.
2. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN EXPOSING EXISTING UTILITY CROSSINGS AND SERVICES. ANY DAMAGE TO
EXISTING UTILITIES WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. ANY DAMAGE TO EXISTING SIDEWALK, CURB OR GUTTER WILL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR, WITH REPLACEMENT TO BE DETERMINED BY THE ENGINEER.
4. ALL SAWCUTS OR REMOVAL LIMITS SHALL BE MADE AT EXISTING
EXPANSION OR WEAKENED PLANE JOINTS AND APPROVAL BY THE
ENGINEER.
5. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW G-05'S FOR ALL EXISTING MONUMENTS AND EXISTING WATER VALVES. ALL VALVE AND MONUMENT BOXES SHALL BE ADJUSTED TO FINISHED GRADE.
6. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW STORM DRAIN
AND SEWER MANHOLE FRAME AND GRATES FOR ALL MANHOLES
WITHIN THE PROPOSED PAVING LIMITS. ALL FRAME AND GRATES SHALL BE ADJUSTED TO FINISHED GRADE.
LEGEND
PAVEMENT - 3"AC / 6"AB
CONCRETE - 4"
CONCRETE - 6"
PINE STREET LOCUST STREET
HUGHSON AVENUE
SANTA FE AVENUE
TYPE II SLURRY SEAL
0 20
10 NORTH
484
JOB NO. DATE SCALE DR. BY CK. BY FILE: HUGHSON/PUBLIC/24-C03 SHEET
OF SHEETS 24-C03 7/3/2025 AS SHOWN NSRM
6ENGINEERING PREPARED UNDER THE DIRECTION OF : NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26 w w w . m c r e n g . c o m MCR ENGINEERING, INC. 1242 DUPONT COURT MANTECA , CA 95336 TEL : FAX : ( 209 ) 239 - 6229 ( 209 ) 239 - 8839 DATE PLAN REVISIONS DATE NO. DESCRIPTIONS 2ND STREET SURFACE IMPROVEMENTS HUGHSON, CALIFORNIA 1234567
Know what'sbelow.
Callbefore you dig.
R
811 / 800-227-2600 HUGHSON AVENUE PINE STREET LOCUST STREET 2ND STREET
SANTA FE AVENUE
6EROSION CONTROL PLAN NORTH
0 40
20 80
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE CONSTRUCTION ACTIVITY.
2. EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) SHALL BE INSTALLED AND MAINTAINED DURING THE WET SEASON (OCTOBER 1 THROUGH APRIL 30). SEDIMENT CONTROL BMPs SHALL BE INSTALLED AND MAINTAINED YEAR ROUND.
3. EFFECTIVE EROSION CONTROL BMPs SHALL BE IN PLACE PRIOR TO ANY STORM EVENTS.
4. THE NAME, ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR IMPLEMENTATION OF THE EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE PROVIDED.
5. ALL DRAINAGE INLETS IMMEDIATELY DOWNSTREAM OF THE WORK AREAS AND WITHIN THE WORK AREAS SHALL BE PROTECTED WITH SEDIMENT CONTROL AND INLET FILTER BAGS YEAR ROUND. INLET FILTER BAGS SHALL BE REMOVED FROM THE DRAINAGE INLETS UPON COMPLETION OF CONSTRUCTION.
6. THE CONTRACTOR(S) SHALL KEEP ALL PUBLIC ROADWAYS ADJACENT TO THE PROJECT SITE FREE AND CLEAR OF MUD AND SILT DURING THE TERM OF THIS CONTRACT. THIS INCLUDES MUD CAUSED BY RAIN OR BY THE CONTRACTOR(S) WATERING PROCEDURES FOR DUST CONTROL.
7. ALL STABILIZED CONSTRUCTION ACCESS LOCATIONS SHALL BE CONSTRUCTED WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS.
THE STABILIZED ACCESS SHALL BE MAINTAINED ON A YEAR ROUND BASIS UNTIL THE COMPLETION OF CONSTRUCTION.
8. WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED ROCK THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR BASIN. ALL
SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SANDBAGS, GRAVEL, BOARDS, OR OTHER APPROVED METHODS.
9. SEDIMENT CONTROL BMPs SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE DRAINAGE LEAVES THE PROJECT. SEDIMENT CONTROL BMPs
SHALL BE MAINTAINED YEAR ROUND UNTIL THE CONSTRUCTION IS COMPLETE OR THE DRAINAGE PATTERN HAS BEEN CHANGED AND NO LONGER LEAVES THE SITE.
10. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. CHANGES TO THE EROSION
AND SEDIMENTATION CONTROL PLAN SHALL BE MADE TO MEET FIELD CONDITIONS, BUT ONLY WITH THE APPROVAL OF OR AT THE DIRECTION OF THE CITY ENGINEER.
11. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF FROM ENTERING ANY STORM DRAINAGE SYSTEM.
12. THE EROSION AND SEDIMENTATION CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH CONSTRUCTION IS TO TAKE PLACE. PLANS ARE TO BE RESUBMITTED PRIOR TO SEPTEMBER 1 OF EACH SUBSEQUENT YEAR UNTIL THE CITY ACCEPTS THE SITE IMPROVEMENTS.
13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL FACILITIES AT THE END OF EACH WORK DAY DURING THE RAINY SEASON.
14. IT IS THE RESPONSIBILITIES OF THE CONTRACTOR TO PROTECT TEMPORARY BORROW AREAS AND/OR STOCKPILES WITH APPROPRIATE EROSION CONTROL MEASURES SATISFACTORY TO THE CITY ENGINEER.
15. THE CLEANING OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONSTRUCTION, SHALL BE PERFORMED WITH MECHANICAL SWEEPERS. THE USE OF WATER TRUCKS TO "WASH DOWN" THE STREET IS PROHIBITED.
16. ALL MATERIALS STORED ON SITE SHALL HAVE PROPER ENCLOSURES AND/OR COVERINGS.
17. CONTRACTOR SHALL PLACE FIBER ROLLS AROUND THE SITE PERIMETER. THE CONTRACTOR SHALL INSPECT AND REPAIR FIBER ROLLS AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE TO SEDIMENT RUN-OFF AND CAN BE PERMANENTLY STABILIZED.
18. NO ON-SITE FUELING SHALL TAKE PLACE.
19. THE CONTRACTOR SHALL KEEP THE WORK SITE FREE AND CLEAR OF RUBBISH AND DEBRIS.
20. THROUGHOUT ALL PHASES OF CONSTRUCTION, INCLUDING SUSPENSION OF WORK, AND UNTIL FINAL ACCEPTANCE OF THE PROJECT, THE
CONTRACTOR SHALL KEEP THE PREMISES OCCUPIED BY HIM IN A CLEAN AND ORDERLY CONDITION, DISPOSING OF REFUSE AND LITTER IN A MANNER SATISFACTORY TO THE CITY.
21. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY.
22. THE INFORMATION ON THIS PLAN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR AND SUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL BOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS TO THIS PLAN.
EROSION CONTROL NOTES
CONCRETE SLURRY WASTES
1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES.
2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF IN A TEMPORARY CONCRETE WASHOUT FACILITY.
3. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.
4. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW-CUTTING AC OR PCC TO ENTER STORM DRAINS OR RECEIVING WATERS.
5. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT AND ALLOW SLURRY TO DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5.
6. COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 42-1.02 AND 42-2.02, "CONSTRUCTION."
ON-SITE TEMPORARY CONCRETE WASHOUT FACILITY, TRANSIT TRUCK WASHOUT PROCEDURES
1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING.
2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.
3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE
CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.
4. TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING WASHOUT PROCEDURES.
5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY.
6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHALL BE BROKEN UP, REMOVED, AND DISPOSED. DISPOSE OF HARDENED CONCRETE ON A REGULAR BASIS.
TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE)
1. TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH SUFFICIENT QUANTITY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE CONTRACTOR'S EXPENSE, UPON APPROVAL OF THE ENGINEER.
2. PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL.
REMOVAL OF TEMPORARY CONCRETE WASHOUT FACILITIES
1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE PROPERTY OF THE CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL BE DISPOSED OF.
2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE PROJECT SPECIFICATIONS.
3. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY.
4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, GRINDING AND GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED.
5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITIES AND 12" FOR BELOW GRADE FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION. HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE PROVISIONS IN SECTION 15-3.02, "REMOVAL METHODS", OF THE STANDARD SPECIFICATIONS.
6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE ONCE THE WASHOUT IS 75% FULL.
CONCRETE WASTE MANAGEMENT NOTES
LEGEND
STABILIZED CONSTRUCTION
ENTRANCE TC-1
DESIGNATED
CONSTRUCTION DEBRIS
AREA (UTILIZE WATER- TIGHT
DUMPSTERS FOR SOLIDS)
WM-5
DESIGNATED AGGREGATE
AND CONCRETE RINSE
AREA WM-8
DESIGNATED WASH DOWN
AREA NS-8
SAND BAG BARRIER SC-8
1 A
B
C
D
TYPE 3 BARRICADES WITH
"ROAD CLOSED" SIGN
FIBER ROLLS SC-5
VEHICLE AND EQUIPMENT
MAINTENANCE AREA NS-10
PROVIDE GRAVEL BAGS AND INLET
PROTECTION AT NEAREST DOWNSTREAM CURB
INLET ON EACH CROSS STREET.
NOTE
PROVIDE STORM DRAIN
INLET SEDIMENT
PROTECTION SC-10
EROSION CONTROL PLAN
ROAD CLOSED
SIGNS (TYP)
A B C D
PROVIDE AND INSTALL GRAVEL BAGS AT
THE LIMITS OF THE PROJECT (TYP)
PROVIDE AND INSTALL GRAVEL BAGS AT
THE LIMITS OF THE PROJECT (TYP)
DESIGNATED CONSTRUCTION ENTRANCE,
LOCATION TO VARY PER CONTRACTOR
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
Meeting Date: July 14, 2025
Subject: Approval to Authorize City Staff to Release Bid Documents for the 2025 Ramp Replacement Project
Enclosure: Bid and Plan Set
Presented By: Carla C. Jauregui, Community Development Director Approved By: ___________________________
Recommended Council Action:
Authorize City staff to release bid documents for the 2025 Ramp Replacement Project (Phase II of the Citywide Street Preservation Program).
Background and Overview:
The 2025 Ramp Replacement Project is Phase II of the City of Hughson’s ongoing initiative to preserve and enhance its roadway infrastructure and pedestrian accessibility. Phase I, completed in 2024, involved surface preservation through slurry seal treatments on priority streets identified in the 2021 Pavement Management Program (PMP) update.
Phase II focuses on the installation and replacement of 58 ADA compliant pedestrian curb ramps at key locations throughout the city. These ramps will improve safety, accessibility, and connectivity for all pedestrians, especially those with disabilities, and are a necessary step ahead of future pavement preservation efforts. Ramps will be constructed in compliance with current Americans with Disabilities Act (ADA) standards and City specifications.
This work aligns with the City’s long-term pavement strategy developed in partnership with the Stanislaus Council of Governments (StanCOG). As part of the regional PMP update, Hughson’s 28.1 centerline miles of roadway were evaluated and assigned Pavement Condition Index (PCI) scores. The City’s network at that time had an average PCI of 79, the highest among all jurisdictions in Stanislaus County and 13 points above the statewide average. The PMP emphasizes that preserving good pavement conditions through timely rehabilitation is far more cost-effective than allowing streets to deteriorate and require full reconstruction.
CITY COUNCIL AGENDA ITEM NO. 6.3
SECTION 6: NEW BUSINESS
508
The ramp replacement project is funded through Measure L, the countywide 25-year, halfcent transportation sales tax approved by Stanislaus County voters in November 2016.
Garnering nearly 72% voter support, Measure L was created to provide dedicated funding for transportation infrastructure through 2042. Of the funds collected, 65% is returned directly to local jurisdictions for projects that enhance roadways, improve traffic flow and promote active transportation. The City of Hughson receives an annual allocation and has used these funds to complete significant improvements while also reserving revenue for strategic long-term projects like this one. The ramp work prepares the street network for future resurfacing efforts and reflects the City’s commitment to transparent and effective use of taxpayer-approved funds.
Fiscal Impact:
The 2025 Ramp Replacement Project will be funded using Measure L transportation sales tax revenue. The City currently has approximately $1,393,000 in available Measure L funds, minus the engineering costs associated for preparing this project to this point. The Engineer’s Estimate for construction is $700,000. With a 10% construction contingency and a 10% construction management contingency, the total estimated project cost is approximately $840,000.
509
CITY OF HUGHSON
DEPARTMENT OF PUBLIC WORKS
NOTICE TO CONTRACTORS
SPECIAL PROVISIONS
PROPOSAL & CONTRACT
FOR
2025 RAMP REPLACEMENT
PREPARED BY:
MCR ENGINEERING, INC.
1242 DUPONT COURT
MANTECA, CALIFORNIA 95336
(209) 239-6229
(209) 239-8839 FAX
MAY 2025
510
Table of Contents i
TABLE OF CONTENTS
NOTICE TO CONTRACTORS ................................................................................................................................................. NC-1 INSTRUCTION TO BIDDERS ...................................................................................................................................................IB-1
PROPOSAL
PROPOSAL .................................................................................................................................................................... . P-1 CONTRACTORS BID ...................................................................................................................................................... . P-3 BIDDER’S BOND ............................................................................................................................................................ . P-4 LIST OF SUBCONTRACTORS ......................................................................................................................................... . P-5 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION .............................................................................................. . P-6 PUBLIC CONTRACT CODE ............................................................................................................................................. . P-7 NON-COLLUSION AFFIDAVIT ....................................................................................................................................... . P-8 DEBARMENT AND SUSPENSION CERTIFICATION ....................................................................................................... . P-9 NON-LOBBYING CERTIFICATION ................................................................................................................................. P-10
CONTRACT
AGREEMENT FOR PUBLIC IMPROVEMENT ................................................................................................................. . C-1 EXHIBIT A: PROJECT DESCRIPTION & SCOPE .............................................................................................................. . C-8 EXHIBIT B: PAYMENT – SCHEDULE OF VALUES .......................................................................................................... . C-9 EXHIBIT C: CLAIMS REQUIREMENTS ........................................................................................................................... C-10 EXHIBIT D: INSURANCE PROVISIONS .......................................................................................................................... C-12 SAMPLE PAYMENT BOND ............................................................................................................................................ C-18 SAMPLE PERFORMANCE BOND .................................................................................................................................. C-19 NOTICE OF AWARD ...................................................................................................................................................... C-20 NOTICE TO PROCEED ................................................................................................................................................... C-21
SPECIAL PROVISIONS
SECTION 1. SPECIFICATIONS AND PLANS ......................................................................................................... SP-1 SECTION 2. BIDDING .......................................................................................................................................... SP-2 SECTION 3. AWARD AND EXECUTION OF CONTRACT ...................................................................................... SP-3 SECTION 4. SCOPE OF WORK ............................................................................................................................. SP-5 SECTION 5. CONTROL OF WORK ....................................................................................................................... SP-7 SECTION 6. CONTROL OF MATERIALS ............................................................................................................... SP-12 SECTION 7. LEGAL RELATIONS AND RESPONSIBILITIES .................................................................................... SP-14 SECTION 8. PROSECUTION AND PROGRESS ...................................................................................................... SP-23 SECTION 9. MEASUREMENT AND PAYMENT .................................................................................................... SP-27 SECTION 10. TECHNICAL SPECIFICATIONS .......................................................................................................... TS-1 511
2025 Ramp Replacement NC-1
NOTICE TO CONTRACTORS
Contractors are invited to submit written formal bids for:
2025 Ramp Replacement
Bids shall be submitted in sealed envelopes on the form provided with the specifications for that purpose. Envelopes shall be addressed to
Office of the City Clerk of the City of Hughson
7018 Pine Street
Hughson, California 95326
and plainly marked:
2025 Ramp Replacement
and delivered to the City Clerk at City Hall, City of Hughson, 7018 Pine Street, Hughson California, 95326, up to 2:00 P.M., Wednesday, August 13, 2025, at which time subject bids will be publicly opened and read aloud.
Proposal forms for this work are included in the “Proposal” section of this document.
The work to be performed consists, in general, of upgrading existing curb ramps and returns to meet current accessibility standards. Other such items and details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions shall be performed, placed, constructed, or detailed.
Bids are required for the entire work described herein. The Contractor shall posses a Class A license at the time this contract is awarded.
This contract is subject to state contract non-discrimination and compliance requirements pursuant to Government Code Section 12990.
Plans, specifications and proposals are available through CITY OF HUGHSON’S website https://www.hughson.org/public-works/page/bids-rfps. The successful bidder will be furnished with additional plans and specifications, upon request, at no additional cost. For information please call the City Engineer at (209) 239-6229 or City Hall at (209) 883-4054.
Bids shall be accompanied by a Proposal Guaranty of a certified check or bidder’s bond of not less than 10 percent (10%) of the total amount of the bid, made payable to the order of the City of Hughson, to be retained as liquidated damaged by the Owner if the successful bidder fails to enter in to a Contract.
Upon entering into a contract, the successful bidder will be required to furnish a Performance Bond and a Payment Bond each for 100 percent of the contract amount.
The City of Hughson hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement any disadvantaged business enterprises will be afforded full 512
2025 Ramp Replacement NC-2
opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
Pursuant to Section 1773 of the Labor Code, the general prevailing rate of wages in the County in which work is to be done has been determined by the Director of the Department of Industrial relations.
These wage rates and the Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the serially numbered books issued for bidding purposes entitled “Proposal and Contract”, and in the copies of said book that may be examined at the offices described above where project plans, special provisions, and proposal forms may be seen. Addenda to modify rates, if necessary, will be issued to holders of “Proposal and Contract” books. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates.
Attention is directed to the Federal minimum wage rate requirements in said books entitled “Proposal and Contract”. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wages not specifically included in the Federal minimum wager determinations. This includes “helper” (or other classifications based on hours of experience) or any other classification not appearing in Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determinations otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall not pay less than the Federal minimum wage rate which most closely approximates the duties of the employees in question.
The U.S. Department of Transportation (DOT) provides a toll-free “hotline” service to report bid rigging activities. Bid rigging activities can be reported Mondays through Fridays, between 8:00 a.m. and 5:00 p.m., Eastern Time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report these activities. The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected.
The Owner reserves the right to reject any or all bids, or to waive any informalities. If awarded, a contract will be awarded within 10 days of the bid opening. The Contract shall be signed within 14 calendar days; not including Sundays and legal holidays, after receipt of the Notice of Award, and work shall be completed within ninety (90) calendar days after Notice to Proceed.
For any moneys earned by the Contractor and withheld by the City of Hughson to ensure the performance of the contract, the Contractor may, at his request and expense, substitute securities equivalent to the amount withheld in the form and manner and subject to the conditions provided in Sections 22300 and 10263 if the Public Code of the State of California. 513
2025 Ramp Replacement IB-1
INSTRUCTIONS TO BIDDERS
ENGINEER:
MCR Engineering, Inc.
1242 Dupont Court
Manteca, CA 95336
(209) 239-6229
OWNER:
CITY OF Hughson
Public Works Department
7018 Pine Street
Hughson, CA 95326
Phone: (209) 883-4054
PART 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders, which are defined in the General Conditions and Supplementary Conditions have the meaning assigned to them in the General Conditions and the Supplementary Conditions. The term "Bidder" means one who submits a bid directly to the Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest, qualified, responsible, responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all addenda issued prior to receipt of Bids).
PART 2 - COPIES OF CONTRACT DOCUMENTS
2.01 Complete copies of the Plans and Specifications for use in preparing bids may be obtained in accordance with the Invitation to Bid.
2.02 Partial sets of Bidding Documents will not be issued. Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
PART 3 - QUALIFICATIONS OF BIDDERS
3.01 In accordance with Labor Code Section 1771.1(a):
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 . It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
This requirement also applies to subcontractors listed in the Bid Proposal. 514
2025 Ramp Replacement IB-2
3.02 Each Bidder shall type or write in a legible manner their California Contractor's license number on the outside of the envelope or wrapper which contains their bid and in the space provided on the Bid Form or attach a notarized affidavit to their Bid that if they are the successful Bidder he/she will secure a valid California Contractor's license before beginning work.
3.03 The contractor who is awarded a contract must be properly licensed as a contractor from contract award through contract acceptance (Public Contract Code § 10164).
3.04 Each bidder must be prepared to submit within five (5) days of Owner’s request written evidence of their qualifications to perform the work. Bidders may be required to submit evidence that they have a practical knowledge of the particular work bid upon, and that they have the financial resources to complete the proposed work. In determining the Bidder's qualifications, the following factors will be considered: work previously completed by the Bidder and whether the Bidder (a) maintains a permanent place of business, (b) has adequate plant and equipment to do the Work properly and expeditiously, (c) has the financial resources to meet all obligations incident to the Work, and (d) has appropriate technical experience. Each Bidder may be required to show that they have handled former work so that no just claims are pending against such work. No bid will be accepted from a Bidder who is engaged on any work, which would impair their ability to perform or finance this work.
PART 4 - EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.01 It is the responsibility of each bidder before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the work, (c) consider federal, state and local laws and regulations that may affect cost progress, performance or furnishing of the work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents.
4.02 Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the work and which Bidder deems necessary to determine its Bid from performing and furnishing the work in accordance with the time, price and other terms and conditions of the Contract Documents.
4.03 On request in advance, Owner will provide each Bidder access to the site to conduct such explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up and restore the site to its former condition upon completion of such explorations.
4.04 The work must be confined to the rights-of-way of the various streets shown on the plans within the project limits, unless other arrangements are made by the contractor.
4.05 Access to the site (if needed) may be arranged by contacting the City of Hughson, at telephone number (209) 883-4054. In general, site access will be limited to normal working hours. 515
2025 Ramp Replacement IB-3
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this part, that without exception the Bid is premised upon performing and furnishing the work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the work.
4.07 No Pre-Bid Job Walk will be held for this project.
PART 5 - INTERPRETATIONS AND ADDENDA
5.01 All questions about the meaning or intent of the Contract Documents are to be submitted to Engineer.
Replies will be issued only by Addenda. Questions received within the week of the date fixed for the opening of bids will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
5.02 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer.
5.03 The City will make reasonable efforts to deliver Addenda to all Bidders who are known by the City to have received a complete set of Contract Documents and who have provided a street address for receipt of Addenda. The City makes no guarantee that all Bidders will receive all issued Addenda. Each Bidder shall be responsible for ascertaining, prior to submitting its Bid, that it has received all issued Addenda.
Each Bidder shall acknowledge receipt of all addenda on the Bid Form. Failure to acknowledge receipt of Addenda may render the bid non-responsive. Bidder shall not rely upon any interpretation or correction given by any other method. All Addenda shall become part of the contract documents. No Addenda will be issued within two days or forty-eight (48) hours of the date and time fixed for the opening of bids except an Addendum, if necessary, postponing the date for receipt of Bids or withdrawing the request for Bids.
PART 6 - BASIS OF BIDS
6.01 The Bidder shall submit a single base bid price as required by the Proposal, said base bid being the total of the prices for the various items listed in the Bid Form. The Base Bid shall be stated in words and numerals, in case of a conflict, words will take precedence.
PART 7 - BID SECURITY
7.01 Bid Security shall be made payable to Owner, in an amount of 10 percent of the Bidder's maximum Bid price and in the form of a certified or bank check or a Bid Bond (on form attached if a form is prescribed) issued by a Surety meeting the requirements of the General Conditions.
7.02 The Bid Security of the Successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required Contract Security, whereupon it will be returned; if the successful Bidder fails to execute and deliver the Agreement and furnish the required Contract security within 14 calendar days of the Notice of Award, Owner may annul the Notice of Award and the Bid Security of that Bidder 516
2025 Ramp Replacement IB-4
will be forfeited. The Bid Security of any Bidder whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of the seventh day after the "effective date of the Agreement" (which term is defined in the General Conditions) by Owner to Contractor and the required Contract Security is furnished or the first day following the end of time specified in the Bid form during which the Bids shall remain open. Bid Security of other Bidders will be returned within 10 days of the Bid opening.
PART 8 - SUBSTITUTE MATERIAL AND EQUIPMENT
8.01 The Contract, if awarded, will be on the basis of material and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or-equal" items.
Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by Contractor and consideration by Engineer is set forth in the General Conditions which are supplemented in the General Requirements.
8.02 Whenever a material or article is specified or described by using the name of a proprietary product or the name of a particular manufacturer or vendor, the specified item mentioned shall be understood as establishing the type, function, and quality desired. Other manufacturer's products will be accepted provided sufficient information is submitted to allow Engineer to determine that the products submitted are equivalent to those names. Applications for such review will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by Contractor and consideration by Engineer is set forth in the General Conditions which are supplemented in the General Requirements.
PART 9 BID FORM
9.01 Bid form is to be completed and submitted with bid.
9.02 Bid forms must be completed in black or blue ink.
9.03 Bid by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of the authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
9.04 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.
9.05 Bids by joint ventures shall be signed by each participant in the joint venture or by an authorized agent of each participant.
9.06 The names of all persons signing must also be legibly printed or typed below the signature. A Bid by a person who affixes to their signature the work "president", "secretary", "agent", or other designation 517
2025 Ramp Replacement IB-5
without disclosing their principal may be held to be the Bid of the individual signing. When requested by Owner, evidence of the authority of the person signing shall be furnished.
9.07 The full name of each person or company interested in the Bid shall be listed on the Bid Form.
9.08 The Bidder shall acknowledge receipt of all Addenda on the bid form.
9.09 No alterations in Bids, or in the printed forms therefore, by erasures. Interpolations, or otherwise will be acceptable unless each such alteration is signed by the Bidder; if initialed, Owner may require the Bidder to identify any alteration so initialed. No alteration in any Bid, or in the form on which it is submitted, shall be made after the Bid has been submitted.
9.10 The address to which communications regarding the Bid are to be directed must be shown.
PART 10 - SUBCONTRACTOR LISTING
10.01 Each Bidder shall list on the form provided, the name and the address of each subcontractor who will perform work or labor, or render service to the Bidder in or about the work; or a licensed subcontractor who, under subcontract to the Bidder, specially fabricates and installs a portion of the work, in an amount in excess of one-half of one percent and the portion of the work which will be done by each subcontractor.
10.02 If a Bidder fails to specify a subcontractor for any portion of the work, the bidder shall perform that portion themself or obtain the written approval of the Owner for the proposed subcontractor.
PART 11 - SUBMISSION OF BIDS
11.01 Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be included in an opaque sealed envelope addressed to City of Hughson and identified on the outside with the Bidder's name, license number, and address and with the words:
Bid for the 2025 RAMP REPLACEMENT
11.02 Each Bid shall be accompanied by the Bid Security and other required documents.
11.03 If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "BID ENCLOSED" on the face thereof.
11.04 Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or the modified time and date indicated by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
11.05 Oral, telephone, telegraph, or electronic Bids are invalid and will not receive consideration. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association.
518
2025 Ramp Replacement IB-6
PART 12 - MODIFICATION AND WITHDRAWAL OF BIDS
12.01 Bids submitted early may be modified or withdrawn by notice to the party receiving Bids at the place and prior to the time designated for receipt of Bids. Such notice shall be in writing over the signature of the Bidder or be by telegram; written confirmation over the signature of Bidder must have been mailed and postmarked on or before the date and before time set for receipt of Bids; it shall be so worded as not to reveal the amount of the original Bid. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he/she could prove their identity and authority.
Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders.
12.02 If, within 24 hrs after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of their Bid, that Bidder may withdraw their bid, and their Security will be returned. Thereafter, that Bidder will be disqualified from further bidding on the work.
PART 13 - OPENING OF BIDS
13.01 Bids will be opened publicly and read aloud at the time and place shown in this notice. An abstract of the amounts of the base Bids and major alternates (if any) will be made available after the opening of Bids.
PART 14 - AWARD OF CONTRACT
14.01 Owner reserves the right to reject any and all Bids, to waive any and all informalities and to negotiate contract terms with the successful Bidder, and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids. Owner reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Discrepancies between words and figures will be resolved in favor of words. Discrepancies between the indicated sum of product of figures and the correct sum or product thereof will be resolved in favor of the correct or product sum.
14.02 In evaluating Bids, Owner shall consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and alternates and unit prices if requested in the Bid Forms. It is Owner's intent to accept alternates (if any are accepted) in the order in which they are listed in the Bid form but Owner may accept them in any order or combination.
14.03 Owner may consider the qualifications and experience of Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the work as to which the identity of Subcontractors and other persons and organizations must be submitted as provided in the Supplementary Conditions. Operating costs, maintenance considerations, performance data and guarantees of materials and equipment may also be considered by Owner.
519
2025 Ramp Replacement IB-7
14.04 Owner may conduct such investigations as they deem necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of the Bidders, proposed Subcontractors and other persons and organizations to do the work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.
14.05 Owner reserves the right to reject the Bid of any Bidder who does not pass any such evaluation to Owner's satisfaction.
14.06 If the contract is to be awarded, it will be awarded to the lowest, responsible, responsive Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests of the Project.
14.07 Bidders may file a “protest” of the commended award of a contract. Protests may only be submitted by bidders who submitted a bid proposal for the Project. For a protest to be considered valid, the submittal must:
• be filed within three (3) business days of the bid opening date, in writing, with the City Engineer; • clearly identify the specific accusation(s) involved; • specify, in detail, the ground(s) and fact(s) supporting the protest; • and include all relevant and supporting documentation at the time of filing.
Upon submission of the complete protest package, if validated, the City will review the basis of the protest and all relevant information. The City will provide a written decision to the bidder within five (5) business days after the date of receival. The protestor may appeal the City Engineer’s decision to the City Council.
PART 15 – DESCRIPTION OF BID ITEMS
15.01 Ramp Replacement – The unit price bid for this item shall include all labor, equipment, materials and all incidentals necessary to construct the pedestrian ramps complete in place, at the locations indicated on the plans. Work shall include, but not be limited to sawcutting, removal of concrete and asphalt concrete debris, excavation, grading and subgrade preparation, sub-base, base course, formwork, joint construction, finishing curing, paving, finishing, curing, protection and restoration of existing improvements, replacement of damaged striping, and all incidentals necessary for complete installation.
Truncated dome panels shall be included in the unit price. In general, payment associated with this item of work will be at the unit price bid.
520
2025 Ramp Replacement P-1
PROPOSAL TO CITY OF HUGHSON
DEPARTMENT OF PUBLIC WORKS
FOR THE CONSTRUCTION OF
2025 RAMP REPLACEMENT
HUGHSON, CALIFORNIA
NAME OF BIDDER ___________________________________________________ BUSINESS P.O. BOX __________________________________________________ CITY, STATE, ZIP _____________________________________________________ BUSINESS STREET ADDRESS ___________________________________________ (Please include even if P.O. Box used)
CITY, STATE, ZIP _____________________________________________________ TELEPHONE NO: AREA CODE ( ) __________________________________ FAX NO: AREA CODE ( ) __________________________________ CONTRACTOR LICENSE NO. ____________________________________________ The work for which this proposal is submitted is for construction in accordance with the special provisions (including the payment of not less than the Federal prevailing wage rates or), the project plans described below, including any addenda thereto, the contract annexed hereto, and also in accordance with the Standard Specifications and Drawings for the City of Hughson, dated 2007, and the Labor Surcharge And Equipment Rental Rates in effect on the date the work is accomplished.
The special provisions for the work to be done are included in this document. Project plans for the work to be done were approved and are entitled:
IMPROVEMENT PLANS FOR
2025 RAMP REPLACEMENT
Receipt of copies of the following addenda(s) is hereby acknowledged.
Addendum No. Bidders Signature Date
Bids are to be submitted for the entire work necessary to construct those items listed in the “Contractor’s Bid” sheet (P-3). The amount of the bid for comparison purposes will be the total of all items of the base bid and any combination of the bid alternates.
The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case 521
2025 Ramp Replacement P-2
of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item.
In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, except as provided in (a) or (b), as follows:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount as the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price;
(b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage wise the unit price or item total in the Department's Final Estimate of cost.
If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.
Symbols such as commas and dollar signs will be ignored and have no mathematical significance in establishing any unit price or item total or lump sums. Written unit prices, item totals and lump sums will be interpreted according to the number of digits and, if applicable, decimal placement. Cents symbols also have no significance in establishing any unit price or item total since all figures are assumed to be expressed in dollars and/or decimal fractions of a dollar. Bids on lump sum items shall be item totals only; if any unit price for a lump sum item is included in a bid and it differs from the item total, the items total shall prevail.
The foregoing provisions for the resolution of specific irregularities cannot be so comprehensive as to cover every omission, inconsistency, error or other irregularity which may occur in a bid. Any situation not specifically provided for will be determined in the discretion of the City of Hughson, and that discretion will be exercised in the manner deemed by the City of Hughson to best protect the public interest in the prompt and economical completion of the work. The decision of the City of Hughson respecting the amount of a bid, or the existence or treatment of an irregularity in a bid, shall be final.
If this proposal shall be accepted and the undersigned shall fail to enter into the contract and furnish the 2 bonds in the sums required by the State Contract Act, with surety satisfactory to the City of Hughson within 14 calendar days, not including legal holidays, after the bidder has received notice from the City of Hughson that the contract has been awarded, the City of Hughson may, at its option, determine that the bidder has abandoned the contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of the security accompanying this proposal shall operate and the same shall be the property of the City of Hughson.
The undersigned, as bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firm, or corporation; that he or she has carefully examined the location of the proposed work, the annexed proposed form of contract, and the plans therein referred to; and he or she proposes, and agrees if this proposal is accepted, that he or she will contract with the City of Hughson in the form of the copy of the contract annexed hereto, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract, in the manner and time therein prescribed, and according to the requirements of the Engineer as therein set forth, and that he or she will take in full payment therefore the following prices, to wit:
522
2025 Ramp Replacement P-3
CONTRACTOR’S BID
2025 Ramp Replacement
No. Description Quantity Unit Unit Price Total Price
1. Ramp Replacement 58 EA @ ____________ = _______________
TOTAL BID (NUMBERICAL) = _____________________
TOTAL BID (WRITTEN OUT) = __________________________________________________________ ____________________________ ________________ ______________________________ Bidder’s Signature Title Company Name
523
2025 Ramp Replacement P-4
CITY OF HUGHSON
DEPARTMENT OF PUBLIC WORKS
BIDDER'S BOND
We, ___________________________________________________________________________________________ ________________________________________________________________________________ as Principal, and ______________________________________________________________________________________________ as Surety are bound unto the City of Hughson, hereafter referred to as "Obligee", in the penal sum of ten percent (10%) of the total amount of the bid of the Principal submitted to the Obligee for the work described below, for the payment of which sum we bind ourselves, jointly and severally,
THE CONDITION OF THIS OBLIGATION IS SUCH, THAT:
WHEREAS, the Principal is submitted to the Obligee, for 2025 RAMP REPLACEMENT for which bids are to be opened at Hughson City Hall on August 13, 2025.
NOW, THEREFORE, if the Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him or her for signature, enters into a written contract, in the prescribed form, in accordance with the bid, and files two bonds with the Obligee, one to guarantee faithful performance of the contract and the other to guarantee payment for labor and materials as provided by law, then this obligation shall be null and void; otherwise, it shall remain in full force.
In the event suit is bought upon this bond by the Obligee and judgement is recovered, the Surety shall pay all costs incurred by the Obligee in such suit, including a reasonable attorney's fee to be fixed by the court.
Dated: ________________________________ , 20 ____ .
______________________________________________________
______________________________________________________
______________________________________________________
Principal
______________________________________________________
Surety
By ____________________________________________________ Attorney-in-fact
CERTIFICATE OF ACKNOWLEDGEMENT
State of California
City/County of ___________________________________ SS
On this ___________________________ day of _________________________ in the year 20 ___ before me ____________________________________ , personally appeared ______________________________________ , Attorney-in-fact
personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument as the attorney-in-fact of , and acknowledged to me that he (she) subscribed the name of the said company thereto as surety, and his (her) own name as attorney-in-fact. (SEAL) ____________________________________________________
524
2025 Ramp Replacement P-5
The Bidder shall list the name, address, license number, and DIR number of each subcontractor to whom the Bidder proposes to subcontract portions of the work, as required by the provisions in Section 7 (c) (2) “Required Listing of Proposed Subcontractors,” of the Standard Specifications.
LIST OF SUBCONTRACTORS
Name, Address, License #, DIR # Description of Work Subcontracted
525
2025 Ramp Replacement P-6
(THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS PROPOSAL SHALL ALSO
CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE
A PART OF THIS PROPOSAL)
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder________________________________________________________________, proposed subcontractor ________________________________________________________, hereby certifies that he or she has ____, has not , participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he or she has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. 526
2025 Ramp Replacement P-7
PUBLIC CONTRACT CODE
Public Contract Code Section 10285.1 Statement
In accordance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has ___ , has not ___ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.
Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
Public Contract Code Section 10162 Questionnaire
In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes _____ No _____
If the answer is yes, explain the circumstances in the following space.
Public Contract Code 10232 Statement
In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire.
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
527
2025 Ramp Replacement P-8
NONCOLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY OF HUGHSON
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Noncollusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Noncollusion Affidavit. 528
2025 Ramp Replacement P-9
DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgement rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
529
2025 Ramp Replacement P-10
NONLOBBYING CERTIFICATION
FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(l) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard FormLLL, "Disclosure of Lobbying Activities," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly.
530
2025 Ramp Replacement P-12
DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year ____ quarter _________
f. loan insurance date of last report___________
4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Prime Subawardee
Tier _______ , if known
Congressional District, if known Congressional District, if known
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable ____________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10. a. Name and Address of Lobby Entity b. Individuals Performing Services (including (If individual, last name, first name, MI) address if different from No. 10a) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)
11. Amount of Payment (check all that apply) 13. Type of Payment (check all that apply) $ _____________ actual planned a. retainer
b. one-time fee
12. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature _____________ e deferred
value _____________ f. other, specify__________________________
14. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) if necessary)
15. Continuation Sheet(s) attached: Yes No
16. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature: _________________________________________
Print Name: _______________________________________
Title: ____________________________________________
Telephone No.: ____________________ Date:___________
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
531
1696611-1 C-1
CONSTRUCTION CONTRACT FOR
CITY OF HUGHSON – 2025 RAMP REPLACEMENT PROJECT
This Construction Contract for the above-referenced and herein described Project (“Agreement”) is made and entered into this [DATE] day of [MONTH], [YEAR], by and between the City of Hughson, a California municipal corporation (“City”), and [CONTRACTOR], a [ENTITY] (“Contractor”).
SECTION I - PURPOSE
Contractor shall provide certain construction services (further described in this Agreement) required by City in connection with the project described in Exhibit “A” attached hereto and by this reference incorporated herein (“Project”), on the terms and conditions set forth in this Agreement.
SECTION II – TERM
Section 2.1. Term. The term of this Agreement shall be from the date of execution of this Agreement to [DATE], unless earlier terminated as provided herein.
SECTION III – SCOPE OF SERVICES
Section 3.1. Scope of Services. The scope of services to be provided by Contractor is set forth on Exhibit “A” attached hereto and by this reference incorporated herein (“Services”). Contractor represents it has the qualifications, experience, licenses, and facilities necessary to properly perform the Services in a competent and professional manner, and warrants it will perform the Services as set forth herein in a competent, professional and satisfactory manner. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state, and federal laws, rules, and regulations.
Section 3.2. Schedule of Services. Contractor shall complete the Services within the term of this Agreement and shall meet any other established schedules and deadlines, including any schedule of services set forth in Exhibit “A.”
Section 3.3. Permits, Licenses, Fees, and Other Charges. Contractor shall, in accordance with applicable laws and ordinances, obtain at its his/her/its expense all permits and licenses necessary to accomplish the Services. Failure to maintain a required license or permit may result in immediate termination of this Agreement.
SECTION IV – COMPENSATION
Section 4.1. Total Compensation. The total compensation shall not exceed [AMOUNT] without written approval by City (“Contract Amount”). Extra Work may be authorized, as described below, and if authorized, will be compensated in the manner set forth in this Agreement.
532
1696611-1 C-2
Section 4.2. Payment Application. Contractor shall receive compensation including authorized reimbursements, for all Services rendered pursuant to the schedule of values set forth in Exhibit “B” attached hereto and incorporated herein by reference. On or about the tenth day of each month after the start of the work, an amount equal to ninety-five percent (95%) of the value of all Services completed as of the 20th day of the preceding month, based on the quantities of Services completed, as determined by the City, or City’s agent, less the aggregate of all previous payments made to the Contractor.
Section 4.3. Lien Waivers. It is further agreed by the parties that before each payment is made as provided above, receipts and releases of liens of all kinds for all labor and materials and all other indebtedness connected with the work shall be presented to the City by the Contractor upon the request of the City.
Section 4.4. Final Payment. Sixty (60) days after completion of the Agreement and its acceptance by the City, the balance of the Agreement price will be paid. Such final payment will not be made until completion of the Project and acceptance of the whole by the City.
Section 4.5. Substitution of Securities. Contractor may substitute securities in lieu of retained funds in accordance with Public Contract Code section 22300.
Section 4.6. Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement.
Contractor shall not perform, nor be compensated for, Extra Work without written authorization by City.
Section 4.7 Claims Resolution and Civil Action Procedures. Public Contract Code sections 20104 – 20104.6 govern all public works claims of $375,000 or less which arise between a contractor and a local agency. Public Contract Code section 20104(b)(2) it is stated that “Claim” means a separate demand by the contractor for (a) a time extension; (b) payment of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public work, and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to; or (c) an amount the payment of which is disputed by the local agency. Exhibit “C” attached to this Agreement contains copies of the following: Claims Resolutions Procedures set forth in Public Contract Code section 20104.2, and Civil Action Procedures set forth in Public Contract Code section 20104.4.
SECTION V – CONTRACTOR RESPONSIBILITIES
Section 5.1. Contractor agrees as follows:
a. To do all the work and furnish all the labor, material, equipment and appliances to complete the Services in accordance with this Agreement. b. To do and perform the Services diligently as directed by the City until completion is evidenced by written acceptance by the City.
c. All Services performed by Contractor shall be subject to the approval of City. 533
1696611-1 C-3
d. To remedy, at his/her/its expense, any defects in the Services which shall appear within a period of twelve (12) months from the date of the final acceptance of the Services.
e. Time is of the essence for all work under this Agreement. It is hereby understood and agreed that it is and will be difficult and/or impossible to ascertain and determine the actual damage that the City will sustain in the event of and by reason of Contractor’s delay in completing the Services included in this Agreement within the time limit agreed upon or such extensions thereof as may be granted; therefore, pursuant to Public Contract Code section 7203, Contractor shall forfeit to City [AMOUNT] per calendar day as liquidated damages for each and every calendar day’s delay beyond the time herein prescribed, or such extensions thereof as may be granted, for completion of all the Services included in this Agreement. f. If the total Contract Amount as set forth in this Agreement is in excess of $25,000, then Contractor shall provide a Faithful Performance Bond and a Labor and Materials Bond, in the sum of 100% of the contract price pursuant to the requirements of Civil Code section 9550.
SECTION VI – PUBLIC WORKS REQUIREMENTS
Section 6.1. Public Works Acknowledgement. Contractor acknowledges the Project is a “public work” as defined in Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code (Chapter 1).
Section 6.2. Prevailing Wages. Contractor is aware of the requirements of California Labor Code section 1720, et. seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interest parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1777.6 and 1777.7, 1813, and 1815 of the Labor Code within this Agreement, and Contractor shall therefore comply with the Labor Code sections to the fullest extent required by law. Contractor shall defend, indemnify, and hold City, its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with Prevailing Wage Laws. The statutory provisions for penalties for failing to comply with the Prevailing Wage Laws and labor laws will be enforced, as well as that for failing to pay prevailing wages.
Section 6.3. Registration and Labor Compliance. If the Services are being performed as part of an applicable “public works” or “maintenance” project, then, in addition to the foregoing, pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and all subcontractors must be registered with the Department of Industrial Relations (“DIR”). Contractor shall maintain registration for the duration of the Project and require the same of any subcontractors. This Project may also be subject to compliance monitoring and enforcement by the DIR. It shall be 534
1696611-1 C-4
Contractor’s sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR.
Section 6.4. Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provision of Labor Code section 3700 which requires every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing performance of the Services.
SECTION VII – INSURANCE
Section 7.1. The Contractor shall, at Contractor’s sole cost and expense, obtain and maintain the types and limits of insurance set forth in Exhibit “D” (attached hereto and by this reference incorporated herein) until the expiration of the period for correction of Services as set forth in Section 5.1.d.
Section 7.2. The Contractor shall, at Contractor’s sole cost and expense, abide by all terms and conditions set forth in Exhibit “D” attached to this Agreement.
SECTION VIII – INDEMNIFICATION
To the maximum extent permitted by law, Contractor shall indemnify, hold harmless and defend (at Contractor’s expense with counsel reasonably acceptable to the City) the City, its officials, officers, employees, agents and independent contractors serving in the role of City’s officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Contractor, its subcontractors, and each of their officials, officers, employees and agents) in connection with the Services or any work undertaken or in connection with this Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. Contractor shall pay and satisfy any judgment, award, or decree that may be rendered against City or its directors, officials, officers, employees, volunteers, and agents as part of any such claim, suit, action or other proceeding.
Contractor shall also reimburse City for the cost of any settlement paid by City or its directors, officials, officers, employees, agents, or volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City’s attorneys’ fees and costs, including expert witness fees. Contractor shall reimburse City and its directors, officials, officers, employees, agents, and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor’s obligation to indemnify shall survive the expiration or termination of this Agreement, and shall not be restricted to insurance proceed, if any, received by City, its directors, officials, officers, employees, agents, or volunteers. Notwithstanding the foregoing, to the extent Contractor’s services are subject to Civil Code section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor. 535
1696611-1 C-5
SECTION IX – GENERAL PROVISIONS
Section 9.1. Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:
CITY: CITY OF HUGHSON
POST OFFICE BOX 9
HUGHSON, CA 95326
ATTN: CITY MANAGER
CONTRACTOR: [CONTRACTOR NAME]
[CONTRACTOR ADDRESS]
[CITY, STATE ZIP]
ATTN: [OFFICIAL], [OFFICIAL TITLE]
Section 9.2. Time is of the Essence. Time is of the essence for each and every provision of this Agreement.
Section 9.3. Waiver. It is expressly understood and agreed that a waiver of any of the conditions or covenants of this Agreement shall not be considered a waiver of any of the provisions hereof.
Section 9.4. Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.
Section 9.5. Governing Law; Forum. This Contract shall be governed by the laws of the State of California, regardless of where it was executed. Any dispute that arises under or relates to this Agreement (whether contract, tort, or both) shall be resolved in a superior court located in Stanislaus County, California.
Section 9.6. Assignment. Neither party may assign any of its rights or delegate any of its obligations hereunder without the prior written consent of the other party, which consent shall not be unreasonably withheld, conditioned or delayed. Any purported assignment or delegation in violation of this Section shall be null and void. No assignment or delegation shall relieve the assigning or delegating party of any of its obligations hereunder.
Section 9.7. Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.
Section 9.8. Authority to Enter Agreement. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. City and Contractor each warrants to the other that the individual or individuals who have signed this Agreement on the behalf of City or Contractor, as the case may be, has or have the legal power, right, and authority to make this Agreement and bind each respective party.
Section 9.9. Attorney Fees. In any litigation, arbitration, or other proceeding by which one party either seeks to enforce its rights under this Agreement (whether in contract, tort, or both) or seeks 536
1696611-1 C-6
a declaration of any rights or obligations under this Agreement, the prevailing party shall be awarded reasonable attorney fees, together with any costs and expenses, to resolve the dispute and to enforce the final judgment.
Section 9.10 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings, or agreements. This Agreement may only be modified by a writing signed by both parties.
Section 9.11 Conflicts. In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement and any provision within any of the Bidding Documents or the Contract Documents (as such terms are used and/or defined in the Instructions to Bidders and other relevant documents pertaining to the solicitation of bids used by the City in connection with the Project), the provisions of this Agreement shall govern and control.
IN WITNESS WHEREOF, City and Contractor have executed this Agreement as of the day and year first above written.
CITY OF HUGHSON,
a California municipal corporation
________________________________
By: [OFFICIAL NAME]
Its: CITY MANAGER
Date:____________________________
[CONTRACTOR]
________________________________
By: [CONTRACTOR OFFICIAL NAME]
Its: [CONTRACTOR OFFICIAL TITLE]
Date:____________________________
Approved as to form:
________________________________
By: [OFFICIAL]
Its: CITY ATTORNEY
Date:____________________________
537
1696611-1 C-7
538
1696611-1 C-8
EXHIBIT A
PROJECT DESCRPTION:
This project includes the removal and replacement of existing curb ramps or returns in order to meet current accessibility requirements.
SCOPE OF SERVICES:
The work to be performed consists, in general, of upgrading existing curb ramps and returns to meet current accessibility standards. Other such items and details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions shall be performed, placed, constructed, or detailed. 539
1696611-1 C-9
EXHIBIT B
PAYMENT – SCHEDULE OF VALUES:
See the “Contractor’s Bid”, page P-3, of the bid package. 540
1696611-1 C-10
EXHIBIT C
COPY OF PUBLIC CONTRACT CODE SECTIONS ON CLAIMS RESOLUTION PROCEDURES AND CIVIL ACTION PROCEDURES (as of January 2019)
20104.2 Claims; requirements; tort claims excluded
For any claim subject to this article, the following requirements apply:
(a) The claim shall be in writing and include the documents necessary to substantiate the claim.
Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims.
(b)(1) For claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the claimant in producing the additional information, whichever is greater.
(c)(1) For claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written claims within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant.
(2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the claimant in producing the additional information or requested documentation, whichever is greater.
(d) If the claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute. (e) Following the meet and confer conference, if the claim or any portion remains in dispute, the claimant may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the claimant submits his or her written claim pursuant to subdivision (a) until the time that claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. (f) This article does not apply to tort claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 541
1696611-1 C-11
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code.
20104.4 Civil Action Procedures; mediation and arbitration; trial de novo; witnesses The following procedures are established for all civil actions filed to resolve claims subject to this article:
(a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties.
If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator.
(b)(1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act (Title 4 (commencing with Section 2016.010) of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
(2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds. (3) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo. (c) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process.
542
1696611-1 C-12
EXHIBIT D
INSURANCE PROVISIONS
SECTION 1 REQUIRED INSURANCE COVERAGES FOR CONTRACTORS AND
SUBCONTRACTORS
SECTION 1.1 Contractor, and each subcontractor, throughout the term of the Project, or longer as required below, will procure and maintain in full force and effect, at its sole cost and expense, the following insurance with limits not less than specified herein or as required by law, whichever is greater:
(a) Workers’ Compensation Insurance
(i) Minimum Scope and Limits. Workers’ Compensation Insurance with employer’s liability insurance with limits of the following:
Coverage A. Statutory Benefits - State of Hire
Coverage B. Employers’ Liability of not less than:
Bodily Injury by accident: $1,000,000 each accident
Bodily Injury by disease : $1,000,000 policy limit
Bodily Injury by disease : $1,000,000 each employee
(ii) Waiver of Subrogation. Worker’s Compensation Insurance must contain a waiver of subrogation endorsement providing that each insurer waives any rights of recovery by subrogation, or otherwise, against City and City’s lender(s). A waiver of subrogation shall be effective as to any person even if such person (A) would otherwise have a duty of indemnification, contractual or otherwise, (B) did not pay the Worker’s Compensation Insurance premium directly or indirectly, and (C) does or does not have an insurable interest in the property damaged. (b) Automobile Liability
Insurance to include coverage equivalent in scope to ISO form CA 00 01 with not less than $1,000,000 combined single limit, each accident covering all owned, hired and non-owned autos. If Contractor or any subcontractor does not have any company-owned vehicles, a copy of the declaration page from the personal auto liability policy of the principal(s) of Contractor or each subcontractor making such claim will be acceptable. Hired and non-owned auto coverage of Contractor and each subcontractor must be evidenced through a general liability policy or auto policy. (c) Comprehensive/Commercial General Liability for Construction Manager and Contractor
(i) Minimum Limits. Contractor shall carry Comprehensive General Liability or Commercial General Liability insurance (“CGL”) covering all operations by or on behalf of Contractor providing CGL coverage (equivalent in coverage to ISO form CG 00 01) for bodily injury and property damage, shall not be less than:
543
1696611-1 C-13
Each Occurrence Limit $2,000,000
Personal Advertising Injury Limit
Products and Completed Operations
$1,000,000
$2,000,000
General Aggregate Limit $4,000,000
(ii) Minimum Scope. The policy must include the following scope or endorsements:
1. Standard ISO CG0001 10 01 Contractual Liability coverage, or its equivalent.
2. Separation of Insureds clause.
3. Broad Form Property Damage coverage.
4. A Waiver of Subrogation, to apply in favor of City and any City lender(s).
5. Coverage must be on an “occurrence” form. “Claims Made” and “Modified Occurrence” forms are not acceptable.
6. Such coverage as is afforded by this policy for the benefit of the additional insured(s) is primary and any other coverage maintained by such additional insured(s) shall be non-contributing with the coverage provided under this policy.
7. Premises and Operations coverage with no explosions, collapse, or underground damage exclusion (XCU).
8. The CGL policy may not be subject to a self-insured retention (“SIR”) or deductible that exceeds $25,000. In the event City has been notified of a claim arising from the Project, City may deduct from any amounts otherwise due Contractor to fund the SIR/deductible. In the event the amounts owed to Construction Manager or Contractor is insufficient to meet the SIR/deductible or the Project is completed, City shall be entitled to deduct the remaining balance of the SIR/deductible from amounts owed to Contractor for its work. If any policy is subject to a SIR, then such SIR shall contain or be endorsed to provide that the SIR may be satisfied through payments made by (A) the named insured, or (B) City or (C) any additional insureds, co-insurers, and/or insureds other than the First Named Insured. The policy must also state that the Allocated Loss Adjustment Expenses will satisfy the SIR or deductible. (iii) Additional Insured Endorsements. The Contractor will obtain an Additional Insured Endorsement naming the City and its lender(s) as an additional insured. 544
1696611-1 C-14
(d) CGL for Subcontractors.
(i) Minimum Limits. Subcontractors are required to obtain CGL insurance coverage with CGL coverage (equivalent in coverage to ISO form CG 00 01) for bodily injury and property damage, shall not be less than:
Insurance
Limits
Each Occurrence $2,000,000
Personal
Advertising Injury
Limit
$1,000,000
Products/Completed
Operations
Aggregate Limit
$2,000,000
General Aggregate Limit
(other than
Products/Completed
Operations)
$4,000,000
(ii) Minimum Scope. The policy must include the following provisions:
1. Standard ISO CG0001 10 01 Contractual Liability coverage, or its equivalent.
2. Separation of Insureds clause.
3. Broad Form Property Damage coverage, including completed operations, or its equivalent.
4. An Additional Insured Endorsement (equivalent to ISO form CG 20 10 11 85 or ISO form CG 20 10 10 02 (or earlier edition form), plus ISO form CG 2037 10 01) naming as additional insured: City and any City lender(s).
5. A Waiver of Subrogation, to apply in favor of City and any City lender(s).
6. Coverage must be on an “occurrence” form. “Claims Made” and “Modified Occurrence” forms are not acceptable.
7. Such coverage as is afforded by this policy for the benefit of the additional insured(s) is primary and any other coverage maintained by such additional insured(s) shall be non-contributing with the coverage provided under this policy.
545
1696611-1 C-15
8. Premises and Operations coverage with no explosions, collapse, or underground damage exclusion (XCU).
9. There shall be no exclusion for attached, residential or condominium projects.
10. Products and Completed Operations coverage shall be maintained for the longer of (a) ten (10) years following completion of the Contractor’s work or in the case of subcontractors, the subcontractors’ work, and (b) the applicable statute of limitations and/or repose for the jurisdiction of the site of the Project.
11. There shall be no exclusion for subsidence.
12. There shall be no “pollution” exclusions or its equivalent. (e) Professional Liability Insurance.
1. Minimum Limits. If Contractor or any subcontractor performs or contracts to perform any design/build work in connection with the Project, Contractor or such subcontractor, or its design subconsultant, must have Professional (Errors and Omissions) Liability insurance in limits not less than $2,000,000 each claim and in the aggregate, with a deductible or SIR amount not greater than $50,000.
2. Minimum Scope. Such insurance shall include prior acts coverage sufficient to cover the Services and the work in connection therewith, and contractual liability to cover liability assumed under the Agreement, or in the case of a subcontractor, the subcontract. Such policy may be written on a “claims made” basis provided that the policy has a retroactive date of placement prior to or coinciding with the commencement of any professional services performed on any part of the Services and is to be maintained during the term of the Agreement or any subcontract in connection with the Agreement, in the case of subcontractors, and for a period of ten (10) years after substantial completion of the Project. There shall be no exclusion for attached, residential or condominium projects, or public works projects. Such Contractor or subcontractor performing design/build Work is required to obtain evidence to City that their current Professional Liability policy has no impairment on the aggregate limits before commencing any design/build work.
(f) Property Insurance.
1. Coverages. Contractor and subcontractors performing work in connection with the Project are required to maintain Property Insurance coverage for physical damage (including loss of use therefrom), of their property, supplies and equipment (whether or not owned by them) that are not covered under the City’s Builder’s Risk Insurance. The policy should be maintained for the duration of this Agreement, or in the case of Subcontractors, their subcontracts, and shall continue until the Project is delivered to the City.
2. Required Waivers. Contractor and subcontractors performing work in connection with the Project shall have no recourse, and waive all rights of recovery, against the Indemnified Parties (and any Persons claiming through them) for any physical damage to any property, supplies or equipment of Contractor or 546
1696611-1 C-16
Subcontractors. Each policy shall contain a provision requiring the insurance carriers to waive their rights of subrogation against the parties entitled to indemnification under Section VIII of the Agreement (and all persons or entities claiming through them), and against any other contractor or subcontractor for any monies paid under the said insurance policies. Contractor and each subcontractor performing work in connection with the Project shall cause its insurance carriers to consent to such waiver of subrogation.
3. Additional Insureds. The policy shall name the City and its lender(s) as an additional insureds and loss payees on the property insurance policies in connection with any material stored off-site by Contractor and/or any subcontractor.
4. In the event that materials or any other type of personal property of Contractor is acquired for the Project or delivered to the Project site, Contractor agrees that it shall be solely responsible for such property until it becomes a fixture on the Project, or otherwise is installed and incorporated as a final part of the Project. Such responsibility shall include theft, fire, vandalism, and use, including use by unauthorized persons.
SECTION 2 GENERAL INSURANCE REQUIREMENTS FOR CONTRACTOR AND
SUBCONTRACTORS
SECTION 2.1 All insurance required under this Exhibit D shall be obtained at the sole cost and expense of Contractor, and/or subcontractors, and shall be maintained with insurance carriers properly licensed to do business in the California having a general rating of not less than an “A(-)” and financial rating of not less than at least an “VII” as rated in the most recent edition of A.M. Best’s Insurance Reports or, if not rated by A.M. Best’s Insurance Reports, then a comparable rating from a nationally recognized rating agency approved by the City. Contractor agrees to provide to City a full certified copy of any policy maintained by Contractor at City’s request, and require the same of its subcontractors.
SECTION 2.2 If any subcontractor fails to secure and maintain the required insurance, City or Contractor shall have the right (without any obligation to do so) to secure same in the name and for the account of Contractor in which event Contractor shall pay the costs thereof and furnish upon demand all information that may be required in connection therewith. City shall notify Contractor if City exercises its right, whereupon Contractor’s responsibility to carry such insurance shall cease and all the premiums and other charges associated with such insurance shall be refunded to City. City further reserves the right at any time, with thirty (30) days’ written notice to Contractor, to require that Contractor resume the procurement and maintenance of any insurance for which City has elected to procure pursuant to this subsection; in such event, the sums paid to Contractor by City shall increase to the extent of any previously agreed and implemented reduction (as noted above) attributable to City’s prior assumption of the particular insurance coverages. Such refund shall be equitably pro-rated based upon Contractor’s completed Services at the time of such adjustment.
SECTION 2.3 All insurance policies must provide per the terms and conditions of the insurance policies a thirty (30) days’ written notice to City of any cancellation, non-renewal or modification of any such policies and a ten (10) days’ notice of cancellation for non-payment of premium to City. Contractor shall and shall require all Subcontractors to shall provide City with a copy of any notice of reduction or cancellation that they receive within five (5) business days of receipt of such notice. Contractor and each of its subcontractors shall supply City with updated replacement certificates of insurance and/or copies of insurance policies that evidence the continuation of all of the terms and conditions of the coverage, limits of protection, and scope of coverage as required by this Exhibit D. 547
1696611-1 C-17
SECTION 2.4 No act or omission of any insurance agent, broker or insurance company representative shall relieve Contractor of any of its obligations under the Agreement.
SECTION 2.5 Contractor or its subcontractors (or any combination thereof) shall not take any actions that would suspend or invalidate any of the required coverages during the time period such coverages are required to be in effect.
SECTION 2.6 Each insurance policy shall provide that any failure to comply with reporting provisions of the policies by Contractor shall not affect coverage provided to City and all additional insureds.
SECTION 2.7 No Limitations on Coverage. The insurance limits herein are minimum levels of insurance only and nothing herein should be construed to limit the actual limits of insurance obtained by Contractor or its subcontractors. Should Contractor or its subcontractors obtain limits and coverages in excess of the minimum insurance requirements contained herein, then the limits in the policy shall apply to this Project.
SECTION 2.8 The Certificates of Insurance shall state “All Operations” of Contractor performed on behalf of City shall be covered by such insurance.
SECTION 2.9 City reserves the right, in its sole discretion, to require higher limits of liability coverage if, in City’s opinion, operations by or on behalf of Contractor create higher than normal hazards, and, to require Contractor to name additional parties in interest to be an additional insureds, and included in any required Waiver of Subrogation, Notice of Cancellation, or other endorsement. If City exercises the right to require higher limits, City and Contractor shall negotiate an equitable adjustment through a change order.
SECTION 2.10 Nothing in this Exhibit D shall reduce Contractor’s, and any subcontractor’s obligations under the Agreement. Contractor’s (or any subcontractors’) procurement and/or maintenance of insurance shall not be construed as a limitation of liability or as full performance of the indemnification and hold harmless provisions of the Agreement.
SECTION 2.11 Certificates of Insurance. Neither Contractor nor any subcontractor shall commence any Services or other work on or about the site of the Project including, without limitation, bringing any equipment or personnel onto the Project site, until such time as City has received, reviewed and approved evidence satisfactory to City that all mandatory insurance as specified in this Exhibit D has been obtained by such parties and that such insurance is in form and substance satisfactory to City. Prior to the commencement of the Services, Contractor and each subcontractor are required to provide certificates of insurance to City as evidence that policies specified in this Exhibit D are in full force and effect.
Acceptance and/or approval by City of the insurance herein shall not be construed to waiver or relieve Contractor or subcontractors from any obligations, responsibilities or liabilities under the Agreement.
Certificates of insurance will be labeled and addressed as follows:
CITY OF HUGHSON
POST OFFICE BOX 9
HUGHSON, CA 95326
ATTN: CITY MANAGER
SECTION 2.12 Waiver of Right to Recovery. Contractor, and any subcontractor performing work in connection with the Project retained by or for Contractor, hereby waive all rights of recovery by subrogation, because of deductible or self-insured retention clauses, inadequacy of limits of any insurance policy, limitations or exclusions of coverage, and for any other reasons, against each other, City, and its elected officials, managers, officers, directors, agents, and employees, and any other 548
1696611-1 C-18
contractor, subcontractor or other person or entity performing work or rendering services on behalf of City in connection with the Project.
SECTION 2.13 Umbrella/Excess Liability Insurance. If excess/umbrella policies are used to meet the limits of liability requirement said policies shall be “following” form of the underlying primary policy. Evidence of such coverage shall be provided in the form of a certificate of insurance and endorsements in compliance with Section 2.11 before Contractor or any subcontractor commences work on the Project.
SECTION 2.14 Property Insurance. Where Property/Builder’s Risk insurance is not purchased by City for the benefit of Contractor and any subcontractor performing work in connection with the Project, then Contractor and each subcontractor shall be fully responsible for all loss or damage to Contractor and/or each subcontractor’s work, and Contractor and/or each subcontractor shall obtain Property/Builder’s Risk insurance covering Contractor, and/or each subcontractor’s work. Such insurance shall also apply to any of City’s property in the care, custody, or control of Contractor and/or each subcontractor.
SECTION 2.15 All capitalized terms used herein and not defined herein shall have the meanings ascribed to them in the Agreement.
549
CITY OF HUGHSON
COMMUNITY DEVELOPMENT DEPARTMENT
SAMPLE PAYMENT BOND
(Section 3247, Civil Code)
WHEREAS, The City of Hughson, acting by and through the Community Development Department, hereafter referred to as "Obligee", has awarded to Contractor hereafter designated as the "Principal", a contract for the work described as follows:
The work generally consists of, but is not limited to, the following: a d j u s t water and sewer services, roadway excavation and grading, asphalt grinding/milling, roadway paving and street striping. The contractor shall include in his or her bid and provide all labor, tools and materials for a complete project in conformance with the intent shown on the drawings and specified herein.
AND WHEREAS, said Principal is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons as provided by law.
NOW, THEREFORE, we the undersigned Principal and Surety are bound unto the Obligee in the sum of _________________________________________dollars ($ ) , for which payment, we bind ourselves, jointly and severally.
THE CONDITION OF THIS OBLIGATION IS SUCH,
That if said Principal or its subcontractors shall fail to pay any of the persons named in Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by such claimant, or any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board for the wages of employees of the Principal and his or her subcontractors pursuant to Section 18806 of the Revenue and Taxation Code, with respect to such work and labor, that the surety herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, the surety will pay a reasonable attorney's fee to fixed by the court.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 3181 as to give a right of action to such persons or their assigns in any suit brought upon this bond.
Dated: _________________________, 20
Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
Principal
Surety (SEAL)
By: Attorney-in-Fact
NOTE: Signatures of those executing for the surety must be properly acknowledged.
CERTIFICATE OF ACKNOWLEDGEMENT
State of California
City / County of ______________________________________ On this day of ____________________, 20___before me _______________________________ personally appeared ___________________________________ personally known to me (or proved to me on the basis of satisfactory evidence) Attorney-in-Fact
to be the person whose name is subscribed to this instrument as the attorney-in-fact of ___________________and acknowledged to me that he/she subscribed the name of the said company thereto as surety, and his/her own name as attorney-in-fact. (SEAL) Notary Public
550
CITY OF HUGHSON
COMMUNITY DEVELOPMENT DEPARTMENT
SAMPLE PERFORMANCE BOND
(To Accompany Contract)
Bond No.________
WHEREAS, the City of Hughson, acting by and through the Community Development Department, has awarded to Contractor hereafter designated as the
"Contractor", a contract for the work described as follows:
The work generally consists of, but is not limited to, the following: a d j u s t water and sewer services, roadway excavation and grading, asphalt grinding/milling, roadway paving and street striping. The contractor shall include in his/her bid and provide all labor, tools and materials for a complete project in conformance with the intent shown on the drawings and specified herein.
AND WHEREAS, the Contractor is required to furnish a bond in connection with said contract, guaranteeing the faithful performance thereof:
NOW, THEREFORE, we the undersigned Contractor and Surety are held firmly bound to the City of Hughson in the sum of $ dollars, to be paid to said City or its certain attorney, its successors and assigns: for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH,
That if the above bound Contractor, its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the foregoing contract and any alteration thereof made as therein provided, on his (her) or their part to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning, and shall indemnify and save harmless the City I County of , its officers and agents, as therein stipulated, then this obligation shall become and be null and void; otherwise it shall be and remain in full force and virtue.
IN WITNESS WHEREOF, We have hereunto set our hands and seals on this _________ day of ______________, 20___ Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
Contractor
Name of Surety (SEAL)
By: Attorney-in-Fact
NOTE: Signatures of those executing for the surety must be properly acknowledged.
CERTIFICATE OF ACKNOWLEDGEMENT
State of California, City I County of __________________ On this day of ______________in the year 20 _ before me , a notary public in and for the City I County of personally appeared ______________known to me to be the person whose name is subscribed to this Attorney-in-fact
instrument and known to me to be the attorney-in-fact of_______________________________________________ and acknowledged to me that he/she subscribed the name of the said company thereto as surety, and his/her own name as attorney-in-fact.
(SEAL) Notary Public
551
2025 Ramp Replacement C-20
NOTICE OF AWARD
Description of Work: 2025 RAMP REPLACEMENT
To __________________________________________________________________ (Contractor)
__________________________________________________________________ (Address)
_______________________________________________________________________________ (City, State, Zip)
The City of Hughson, (Owner), represented by the undersigned has considered the proposal submitted by you for the above described work in response to its Notice to Contractors dated _________, 20___, revised ___________, 20___.
It appears that it is to the best interest of said Owner to accept your Proposal in the amount of _____________________________________________________________________ (written description of contract amount)
($ ____________) you are hereby notified that your Proposal has been accepted.
If you fail to execute said contract and to furnish bonds and certificates within 14 calendar days from the date of delivery of this Notice, said Owner will be entitled to consider all your rights arising out of the Owner’s acceptance of your Proposal as abandoned and to award the work covered by your Proposal to another, or to re-advertise the work or otherwise dispose thereof as the Owner may see fit.
Dated this _________ day of _______________, 20___.
OWNER: City of Hughson ACCEPTANCE OF NOTICE
Receipt of the above Notice of Award is hereby
acknowledged
This _______ day of ______________, 20___
By _______________________ By _________________________ Title: _____________________ Title: _______________________ 552
2025 Ramp Replacement C-21
NOTICE TO PROCEED
Description of Work: 2025 RAMP REPLACEMENT
To __________________________________________________________________ (Contractor)
__________________________________________________________________ (Address)
_______________________________________________________________________________ (City, State, Zip)
You are hereby given Notice to Proceed with the construction of the above referenced project. This notice
Given this _________ day of _________________, 20___, begins the ninety (90) days construction period for this project, and unless amended as provided for in the specifications, work shall be completed by the ______ day of _______________, 20___.
Work required beyond the established date of completion for this project will be assessed liquidated damages at the rate of $ 1,000.00 per day in conformance with the specifications.
OWNER: City of Hughson ACCEPTANCE OF NOTICE
Receipt of the above Notice to Proceed is
hereby acknowledged
This _____ day of _______________, 20____
By _______________________ By _________________________ Title: _____________________ Title: _______________________ 553
2025 Ramp Replacement SP-1
CITY OF HUGHSON
DEPARTMENT OF PUBLIC WORKS
SPECIAL PROVISIONS
SECTION 1
SPECIFICATIONS AND PLANS
The work embraced herein shall be done in accordance with the Standard Specifications (current edition), and the Standard Plans (current edition), of the Department of Transportation insofar as the same may apply; in accordance with the City of Hughson’s Standard Plans and Specifications, which plans and specifications are hereinafter referred to same; and in accordance with the following special provisions. In case of conflict between the Standard Specifications and these special provisions, the special provisions shall take precedence over and be used in lieu of the conflicting portions.
Amendments to the Standard Specifications set forth in these special provisions shall be considered as part of the Standard Specifications for the purposes set forth in Section 5-1.04, "Coordination and Interpretation of Plans, Standard Specifications and Special Provisions," of the Standard Specifications. Whenever either the term "Standard Specifications is amended" or the term "Standard Specifications are amended" is used in the special provisions, the indented text or table following the term shall be considered an amendment to the Standard Specifications. In case of conflict between such amendments and the Standard Specifications, the amendments shall take precedence over and be used in lieu of the conflicting portions.
In the event of a conflict in the Contract documents, the order of precedence from highest to lowest shall be as follows:
- These Special Provisions
- The Project Plans
- City of Hughson’s Standard Plans and Specifications
- Standard Specifications
1-1.01 - Definitions And Terms – Whenever in the Standard Specifications, or in any documents or instruments where these specifications govern, the terms State of California, Department of Transportation, Director Engineer, or Laboratory are used, the following terms shall be substituted therefor, and any reference to any of the above terms shall be understood and interpreted to mean and refer to such substituted terms as follows:
STATE OF CALIFORNIA: The City of Hughson
DEPARTMENT OF TRANSPORTATION: The Public Works Department of the City of Hughson.
DIRECTOR: The Director of Public Works of the City of Hughson.
ENGINEER: The City Engineer of the City of Hughson, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them.
LABORATORY: Any laboratory as may be authorized by the City to test materials and work involved in the Contract.
554
2025 Ramp Replacement SP-2
SECTION 2
BIDDING
2-1.01 - GENERAL - The bidder's attention is directed to the provisions in Section 2, "Bidding," of the Standard Specifications and these special provisions for the requirements and conditions which the bidder must observe in the preparation of the proposal form and the submission of the bid.
In accordance with Labor Code Section 1771.1(a):
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 . It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
The bidder's bond shall conform to the bond form in the Bid book for the project and shall be properly filled out and executed. The bidder’s bond form included in that book may be used.
In conformance with Public Contract Code Section 7106, a Noncollusion Affidavit is included in the Bid book. Signing the Proposal shall also constitute signature of the Noncollusion Affidavit.
The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR (Code of Federal Regulations) part 26 in the award and administration of US DOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate. Each subcontract signed by the bidder must include this assurance.
Failure of the bidder to fulfill the requirements of the Special Provisions for submittals required to be furnished after bid opening, including but not limited to escrowed bid documents, where applicable, may subject the bidder to a determination of the bidder’s responsibility in the event it is the apparent low bidder on a future public works contract.
2-1.02 - Required Listing of Proposed Subcontractors - Each proposal shall have listed therein the name and address of each subcontractor to whom the bidder proposes to subcontract portions of the work in an amount in excess of ½ of one percent of their total bid or $10,000, whichever is greater, in accordance with the Subletting and Subcontracting Fair Practice Act, commencing with Section 4100 of the Public Contract Code. The bidder’s attention is invited to other provisions of said Act related to the impositions of penalties for failure to observe its provisions by using unauthorized subcontractors or buy making or unauthorized substitutions.
A sheet for listing the subcontractors, as required herein, is included in the Proposal.
Bidders are cautioned that this listing requirement is in addition to the requirements to provide a list of DBE subcontractors after the opening of the proposals.
555
2025 Ramp Replacement SP-3
SECTION 3
AWARD AND EXECUTION OF CONTRACT
3-1.01 - General – The bidder’s attention is directed to the provisions in Section 3, “Award and Execution of Contract,” of the Standard Specifications and these special provisions for the requirements and conditions concerning award and execution of contract.
Bidders may file a protest of the commended award of a contract. Protests may only be submitted by bidders who submitted a bid proposal for the Project. For a protest to be considered valid, the submittal must:
• be filed within three (3) business days of the bid opening date in writing with the City Engineer; • clearly identify the specific accusation(s) involved; • specify, in detail, the ground(s) and fact(s) supporting the protest; • and include all relevant and supporting documentation at the time of filing.
Upon submission of the complete protest package, if validated, the City will review the basis of the protest and all relevant information. The City will provide a written decision to the bidder within five (5) business days after the date of receival. The protestor may appeal the City Engineer’s decision to the City Council.
Bid protests are to be delivered to the following address:
City of Hughson
7018 Pine Street
Hughson California, 95326
The right is reserved to reject any and all proposals.
The award of the contract, if it be awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed. Such award, if made, will be made within 60 days after the opening of proposals.
This period will be subject to extension for such further period as may be agreed upon in writing between the City and the bidder concerned.
All bids will be compared on the basis of the Engineer’s estimate of the quantities of work to be done. 3-1.02 - Contract Bonds – The Contractor will be required to execute the performance and payment bonds within fourteen calendar days from the date when the Notice of Award is delivered to the Contractor. The performance and payment bonds must each be in the amount of 100 percent of the Contract price with a corporate surety approved by the City and authorized to do business in the state where the Contract is to be performed. Failure to execute the bonds within the time specified shall allow the City to consider that the bidder has abandoned the Contract, in which case the check or bidder’s bond accompanying the proposal shall be the property of the City.
The bond covering performance shall be conditioned upon the performance by the Contractor of all undertakings, covenants, terms, conditions, and agreements of the Contract. The bond covering payment shall be conditioned upon the prompt payment by the Contractor to all persons supplying labor and materials to be used in the performance of the Work. Such bond(s) shall also run in favor of any other person or entities required by law and shall be in the form(s) required by applicable statues, if any, and acceptable to City. Evidence of authority of any attorney, in fact, acting for the corporate surety must be provided in the form of a certificate as to his or her power of attorney and to the effect that it is not terminated and remains in full force and effect on the date of the bond.
The expense of such bond(s) shall be borne by the Contractor. If at any time a surety on such bond(s) becomes irresponsible or loses its right to do business in the aforementioned State, the City may require another surety, which the Contractor shall furnish within ten calendar days after receipt of written notice to do so.
The performance bond shall guarantee the repair of all damage due to faulty materials or workmanship provided or done by the Contractor. This guarantee shall remain in effect for a period of one year after the date of final acceptance of the job by the City.
556
2025 Ramp Replacement SP-4
All alterations, extensions of time, extra and additional work, and other changes authorized by these specifications or any part of the contract may be made without securing the consent of the surety or sureties of the contract bonds. 3-1.03 - Execution of Contract – The contract shall be signed by the successful bidder and returned, together with the contract bonds, within 14 calendar days, after the bidder has received the Notice of Award. 3-1.04 - Failure to Execute Contract – Failure of the lowest responsible bidder, or the second lowest responsible bidder, to execute the contract and file acceptable bonds and certificates of insurance as provided herein within 14 calendar days, not including legal holidays, after such bidder has received notice that the contract has been awarded to them, shall be just cause for the annulment of the award and the forfeiture of the proposal guaranty. 3-1.05 - Return of Proposal Guaranties – Within 10 days after the award of the contract to the lowest responsible bidder, the City will return the proposal guaranties, other than bidder’s bonds, accompanying such of the proposals as are not to be further considered in making the award. Retained proposal guaranties will be held until the contract has been finally executed, after which all proposal guaranties, except bidder’s bond and any guaranties which have been forfeited, will be returned to the respective bidders whose proposals they accompany.
557
2025 Ramp Replacement SP-5
SECTION 4
SCOPE OF WORK
4-1.01 - Beginning of Work, Time of Completion and Liquidated Damages – Attention is directed to the provisions in Section 8-1.03, "Beginning of Work," in Section 8-1.06, "Time of Completion," and in Section 8-1.07, "Liquidated Damages," of the Standard Specifications and these special provisions.
Within twenty days after the Effective Date of the Agreement, but before Contractor starts the Work at the site, a conference attended by Contractor, City, Engineer and others as appropriate will be held to discuss the preliminary construction schedule, to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work.
The Contractor shall begin work within 30 calendar days after the contract has been approved by the attorney appointed and authorized to represent the City of Hughson, or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed.
Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. Contractor shall promptly report in writing to Engineer any conflict, error or discrepancy which Contractor may discover and shall obtain a written interpretation or clarification from Engineer before proceeding with any Work affected thereby; however, Contractor shall not be liable to City or Engineer for failure to report any conflict, error or discrepancy in the Contract Documents, unless Contractor had actual knowledge thereof or should reasonably have known thereof.
This work shall be diligently prosecuted to completion before the expiration of the contract time.
The Contractor shall pay to the City of Hughson the sum indicated in section 8-1.07 of these Special Provisions for each and every calendar day's delay in finishing the work in excess of the number of calendar days prescribed in the contract documents.
4-1.01B - Intent of Plans and Specifications – The intent of the plans and specifications is to prescribe the details for the construction and completion of the work which the contractor undertakes to perform in accordance with the terms of the contract. Where the plans or specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specified, the contractor shall furnish all labor, materials, tools, equipment, and incidentals, and do all the work involved in executing the contract in a satisfactory and workmanlike manner.
4-1.02 - Final Cleaning Up – Before final inspection of the work, the contractor shall clean up the work, material sites, and all ground occupied by them in connection with the work of all rubbish, excess materials, falsework, temporary structures, and equipment. All parts of the work shall be left in a neat and presentable condition. Full compensation for final cleaning up will be considered as included in the prices paid for the various contract items of work and no separate payment will be made therefor.
4-1.03 - Changes – Extra work means work which was not included in the Drawings or Specifications or in any bid Schedule. Extra work does not include any items for which a unit price was stated in the Bid even if the estimated quantity differs from the actual quantity. The City, without invalidating the contract, may order extra work or make changes in or deletions from the work and increase or decrease the Contract price accordingly. All such work shall be executed under the original contract except that any claim for extension of time caused thereby shall be adjusted at the time of ordering such extra work or change. Before becoming effective, all Change Orders must be signed by all parties indicated on the change order form.
The value of such extra work or change shall be determined in one of the following ways:
A. By estimate and acceptance in a lump sum.
B. By any unit prices named in the contract or subsequently agreed upon. 558
2025 Ramp Replacement SP-6
C. By Force Account
The contract price shall be adjusted by considering separately any work added and any work deleted. The Contractor agrees that he or she shall not be entitled to claim damages for anticipated profits on any portion of work that may be deleted. The amount of any adjustment for work deleted from the subsequent monthly pay estimates.
The City reserves the right to contract with any person or firm other than the Contractor for any or all extra work. 4-1.03B - Increased or Decreased Quantities – Increases or decreases in the quantity of a contract item of work will be determined by comparing the total pay quantity of such item of work with the Engineer’s estimate therefor.
If the total pay quantity of any item of work required under the contract varies from the Engineer’s estimate therefor by 25 percent, in the absence of an executed contract change order specifying the compensation to be paid, the compensation payable to the contractor will be a mutually agreed upon amount or will be determined by force account.
4-1.03C - Extra Work – New and unforeseen work will be classed as extra work when determined by the Engineer that such work is not covered by any of the various items for which there is a bid price or by combinations of such items. In the event that portions of such work are determined by the Engineer to be covered by some of the various items for which there is a bid price or combination of such items, the remaining portion of such work will be classed as extra work.
The contractor shall do such extra work and furnish material and equipment therefor upon receipt of an approved contract change order or other written order of the Engineer. 559
2025 Ramp Replacement SP-7
SECTION 5
CONTROL OF WORK
5-1.01 - Authority of Engineer – The Engineer shall decide all questions which may arise as to the quality or acceptability of materials furnished and work performed and as to the manner of performance and rate of progress of the work; all questions which may arise as to the interpretation of the plans and specifications; all questions as to the acceptable fulfillment of the contract on the part of the contractor; and all questions as to compensation. Their decision shall be final, and he or she shall have authority to enforce and make effective such decisions and orders which the contractor fails to carry out promptly. The Engineer will not be responsible or have authority for job safety.
Job safety shall be the sole responsibility of the contractor. 5-1.02 - Plans and Working Drawings – The contract plans furnished consist of general drawings and show such details as are necessary to give a comprehensive idea of the construction contemplated. All authorized alterations affecting the requirements and information given on the contract plans shall be in writing.
The contract plans shall be supplemented by such working drawings prepared by the contractor as are necessary to adequately control the work. No change shall be made by the contractor in any working drawing after it has been approved by the Engineer.
Working drawings for cribs, cofferdams, falsework, centering and form work, and for other temporary work and methods of construction the contractor proposes to use, will be required. Such working drawings shall be subject to approval insofar as the details affect the character of the finished work, but details of design will be left to the contractor who shall be responsible for the successful construction of the work.
It is expressly understood, however, that approval of the contractor’s working drawings shall not relieve the contractor of any responsibility for accuracy of dimensions and details, or for mutual agreement of dimensions and details. It is mutually agreed that the contractor shall be responsible for agreement and conformity of their working drawings with the contract plans and specifications.
Full compensation for furnishing all working drawings shall be considered as included in the prices paid for the contract item of work to which such drawings relate, and no additional compensation will be allowed therefor. 5-1.03 - Differing Site Conditions
a. Contractor Notification:
Promptly notify the City’s Engineer if you find either of the following conditions:
1. Physical conditions differing materially from either of the following:
• Contract documents
• Job site examination
2. Physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the Contract Include details explaining the information you relied on and the material differences you discovered.
If you fail to promptly notify the Engineer, you waive the differing site condition claim for the period between your discovery of the differing site condition and your notification to the Engineer.
If you disturb the site after discovery and before the Engineer's investigation, you waive the differing site condition claim.
b. Engineer’s Investigation and Decision
Upon your notification, the Engineer investigates job site conditions and:
560
2025 Ramp Replacement SP-8
1. Notifies you whether to resume affected work
2. Decides whether the condition differs materially and is cause for an adjustment of time, payment, or both
5-1.04 - Conformity With Contract Documents and Allowable Deviations – Work and materials shall conform to the lines, grades, cross sections, dimensions, and material requirements, including tolerances, shown on the plans or indicated in the specifications. Although measurement, sampling, and testing may be considered evidence as to such conformity, the Engineer shall be the sole judge as to whether the work or materials deviate from the plans and specifications, and their decision as to any allowable deviations therefrom shall be final. 5-1.05 - Coordination and Interpretation of Plans, Specifications, and Special Provisions – The specifications, plans, special provisions, contract change orders, and all supplementary documents are essential parts of the contract, and a requirement occurring in one is as binding as though occurring in all. They are intended to be cooperative, and to describe and provide for a complete work.
Plans shall govern over these specifications; the special provisions shall govern over both these specifications and the plans.
Should it appear that the work to be done, or any of the matters relative thereto are not sufficiently detailed or explained in these specifications, the special provisions, or the plans, the contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform to them as part of the contract. In the event of any doubt or question arising respecting the true meaning of these specifications, the special provisions, or the plans, reference shall be made to the Engineer, whose decision thereon shall be final.
In the event of any discrepancy, between any drawings and the figures written thereon, the figures shall be taken as correct. Detail drawings shall prevail over general drawings. 5-1.06 - Order of Work – When required by the special provisions or plans, the contractor shall follow the sequence of operations as set forth therein.
Full compensation for conforming to such requirements will be considered as included in the prices paid for the various contact items of work, and no additional compensation will be allowed therefor. 5-1.07 - Superintendence – The contractor shall designate in writing before starting work, an authorized representative who shall have complete authority to represent and to act for the contractor. Said authorized representative shall be present at the site of the work at all times when work is actually in progress on the contract.
When work is not in progress, and during periods when work is suspended, arrangements acceptable to the Engineer shall be made for any emergency work which may be required. 5-1.08 - Lines and Grades – See the Special Provisions for staking to be provided by the Engineer.
When the contractor requires such stakes or marks, he or she shall notify the Engineer of their requirements in writing, a reasonable length of time in advance of starting operations that require such stakes or marks. In no event shall a notice of less than two working days be considered a reasonable length of time.
The Contractor shall carefully preserve stakes and marks set by the Engineer. In case such stakes and marks are destroyed or damaged, they will be replaced at the Engineer’s earliest convenience. The contractor will be charged for the cost of replacement or restoration of stakes and marks. This charge will be deducted from any moneys due, or that may become due, the contractor under the contract. 5-1.09 - Inspection – The Engineer shall at all times have access to the work during its construction, and shall be furnished with every reasonable facility for ascertaining that the materials and the workmanship are in accordance with the requirements and intentions of the specification, the special provisions, and the plans. All work done, and all materials furnished, shall be subject to their inspection and approval.
The inspection of the work or materials shall not relieve the contractor of any of their obligations to fulfill their contract as prescribed. Work and materials not meeting such requirements shall be made good and unsuitable work or materials may be rejected, notwithstanding that such work or materials have been previously inspected by the Engineer or that payment therefor has been included in a progress estimate. 561
2025 Ramp Replacement SP-9
Projects financed in whole or in part with State or Federal funds shall be subject to inspection at all times by the agency involved.
5-1.10 - Removal of Rejected and Unauthorized Work – All work which has been rejected shall be remedied, or removed and replaced by the contractor in an acceptable manner and no compensation will be allowed them for such removal, replacement, or remedial work.
Any work done beyond the lines and grades shown on the plans or established by the Engineer, or any extra work done without written authority will be considered as unauthorized work and will not be paid for. Upon order of the Engineer unauthorized work shall be remedied, removed, or replaced at the contractor’s expense.
Upon failure of the contractor to comply promptly with any order of the Engineer made under this Section, the City may cause rejected or unauthorized work to be remedied, removed, or replaced, and to deduct the costs from any moneys due or to become due the contractor.
5-1.11 - Equipment and Plants – Only equipment and plants suitable to produce the quality of work and materials required will be permitted to operate on the project.
Plants shall be designated and constructed in accordance with general practice for such equipment and shall be if sufficient capacity to insure the production of sufficient materials to carry the work to completion within the time limit.
The contractor shall provide adequate and suitable equipment and plants to meet the above requirements, and when ordered by the Engineer shall remove unsuitable equipment from the work and discontinue the operation of unsatisfactory plants.
The make, model number, and empty gross weight of each unit of compacting equipment shall be plainly stamped or stenciled in a conspicuous place on the unit. The gross weight shall be either the manufacturers rated weight or the scale weight.
5-1.12 - Character of Workers – If any subcontractor or person employed by contractor shall appear to the Engineer to be incompetent or to act in a disorderly or improper manner, he or she shall be discharged immediately on the requisition of the Engineer, and such person shall not again be employed on the work. 5-1.13 - Final Inspections – Final inspection and acceptance of the work shall be made for the City by the Engineer.
Such inspection shall be made as soon as practical after the Contractor has notified the City in writing that the Work is ready for such inspection.
5-1.14 - LABOR NONDISCRIMINATION – Attention is directed to the following Notice that is required by Chapter 5 of Division 4 of Title 2, California Code of Regulations.
NOTICE OF REQUIREMENT FOR NONDISCRIMINATION PROGRAM
(GOV. CODE, SECTION 12990)
Your attention is called to the "Nondiscrimination Clause", set forth in Section 7-1.01A(4), "Labor Nondiscrimination," of the Standard Specifications, which is applicable to all nonexempt state contracts and subcontracts, and to the "Standard California Nondiscrimination Construction Contract Specifications" set forth therein. The Specifications are applicable to all nonexempt state construction contracts and subcontracts of $5,000 or more. 5-1.15 - PREVAILING WAGE – Attention is directed to Section 7-1.01A(2), "Prevailing Wage," of the Standard Specifications.
The general prevailing wage rates determined by the Director of the California Department of Industrial Relations, for the county or counties in which the work is to be done, are available at the following internet web site:
http://www.dir.ca.gov/OPRL/dprewagedetermination.htm
562
2025 Ramp Replacement SP-10
The Federal prevailing wage rates as determined by the United States Secretary of Labor are available at the following internet web site:
http://www.wdol.gov/dba.aspx
If there is a difference between the wage rates predetermined by the Secretary of Labor and the wage rates determined by the Director of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. 5-1.16 - NOT USED
5-1.17 - REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES – When the presence of asbestos or hazardous substances are not shown on the plans or indicated in the specifications and the Contractor encounters materials which the Contractor reasonably believes to be asbestos or a hazardous substance as defined in Section 25914.1 of the Health and Safety Code, and the asbestos or hazardous substance has not been rendered harmless, the Contractor may continue work in unaffected areas reasonably believed to be safe. The Contractor shall immediately cease work in the affected area and report the condition to the Engineer in writing.
In conformance with Section 25914.1 of the Health and Safety Code, removal of asbestos or hazardous substances including exploratory work to identify and determine the extent of the asbestos or hazardous substance will be performed by separate contract.
If delay of work in the area delays the current controlling operation, the delay will be considered a right of way delay and the Contractor will be compensated for the delay in conformance with the provisions in Section 8-1.09, "Right of Way Delays," of the Standard Specifications.
5-1.18 - SUBCONTRACTING – No subcontract releases the Contractor from the contract or relieves the Contractor of their responsibility for a subcontractor’s work.
If the Contractor violates Pub Cont Code § 4100 et seq., the City of Hughson may exercise the remedies provided under Pub Cont Code § 4110. The City of Hughson may refer the violation to the Contractors State License Board as provided under Pub Cont Code § 4111.
The Contractor shall perform work equaling at least 30 percent of the value of the original total bid with the Contractor’s own employees and equipment, owned or rented, with or without operators.
Each subcontract must comply with the contract.
Each subcontractor must have an active and valid State contractor’s license with a classification appropriate for the work performed (Bus & Prof Code, § 7000 et seq.)
Each subcontractor must be registered to perform public work with the California Department of Industrial Relations.
Submit copies of subcontracts upon request by the Engineer.
Before subcontracted work starts, submit a Subcontracting Request form.
Do not use a debarred contractor; a current list of debarred contractors is available at the Department of Industrial Relations web site at: http://www.dir.ca.gov/dlse/debar.html Upon request by the Engineer, immediately remove and not again use a subcontractor who fails to prosecute the work satisfactorily.
Each subcontract and any lower-tier subcontract that may in turn be made shall include the “Required Contract Provisions Federal-Aid Construction Contracts” in Section 14 of these special provisions. Noncompliance shall be corrected. Payment for subcontracted work involved will be withheld from progress payments due or to become due, until correction is made. Failure to comply may result in termination of the contract. 5-1.19 - PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS – A prime contractor or subcontractor shall pay any subcontractor not later than 10 days of receipt of each progress payment in accordance with the provisions in Section 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. The 10 days is applicable unless a longer period is agreed to in writing. Any delay or postponement of payment over 30 days may 563
2025 Ramp Replacement SP-11
take place only for good cause and with the City’s prior written approval. Any violation of Section 7108.5 shall subject the violating contractor or subcontractor to the penalties, sanction and other remedies of that section. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor. 5-1.20 - PROMPT PAYMENT OF WITHHELD FUNDS TO SUBCONTRACTORS – The City shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the City, of the contract work, and pay retainage to the prime contractor based on these acceptances. The prime contractor, or subcontractor, shall return all monies withheld in retention from a subcontractor within 30 days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the City. Federal law (49CFR26.29) requires that any delay or postponement of payment over 30 days may take place only for good cause and with the City’s prior written approval. Any violation of this provision shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified in Section 7108.5 of the Business and Professions Code. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor. 5-1.21 - PAYMENTS -- Attention is directed to Section 9-1.06, "Partial Payments," and 9-1.07, "Payment After Acceptance," of the Standard Specifications and these special provisions. No partial payment will be made for any materials on hand but not incorporated into the work.
5-1.22 - ENCROACHMENT PERMIT – Not applicable.
564
2025 Ramp Replacement SP-12
SECTION 6
CONTROL OF MATERIALS
6-1.01 - Source of Supply and Quality of Materials -- The contractor shall furnish all materials required to complete the work, except materials that are designated in the special provisions to be furnished by the City.
Only materials conforming to the requirements of the specifications shall be incorporated in the work.
The materials furnished and used shall be new, except as may specifically be provided elsewhere in these specifications, on the plans, or in the special provisions. The materials shall be manufactured, handled, and used in a workmanlike manner to insure completed work in accordance with the plans and specifications.
The contractor shall furnish the Engineer a list of their sources of materials. The list shall be furnished to the Engineer in sufficient time to permit proper inspecting and testing of materials to be furnished from such listed sources in advance of their use. The contractor shall furnish without charge such samples as may be required. Inspection and tests, if made at any point other than the point of incorporation of the work, in no way shall be considered as a guaranty of acceptance of such material nor of continued acceptance of material presumed to be similar to that upon which inspections and test have been made.
Manufacturer’s warranties, guarantees, instruction sheets and part’s lists, which are furnished with certain articles or materials incorporated in the work, shall be delivered to the Engineer before acceptance of the contract.
Reports and records of inspections made and tests performed, when available at the site of the work, may be examined by the contractor.
6-1.02 - Storage of Materials – Articles or materials to be incorporated in the work shall be stored in such a manner as to insure the preservation of their quality and fitness for the work, and to facilitate inspection. 6-1.03 - Defective Materials – All material which the Engineer has determined do not conform to the requirements of the plans and specifications will be rejected, whether in place or not. They shall be removed immediately from the site of the work, unless otherwise permitted by the Engineer. No rejected material, the defects of which have been subsequently corrected, shall be used in the work, unless approval in writing has been given by the Engineer.
Upon failure of the contractor to comply promptly with any order of the Engineer made under this Section, the Engineer shall have authority to cause the removal and replacement of rejected material and to deduct the cost thereof from any moneys die or to become due the contractor. 6-1.04 - Trade Names and Alterations – For convenience in designation on the plans or in the specifications, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and their catalogue information. The use of an alternative article or material which is of equal quality and of the required characteristics for the purpose intended will be permitted, subject to the following requirements:
The burden of proof as to the quality and suitability of alternatives shall be upon the contractor and he or she shall furnish all information necessary as required by the Engineer. The Engineer shall be the sole judge as to the quality and suitability of alternative articles or materials and their decision shall be final.
Whenever the specifications permit the substitution of a similar or equivalent material or article, no tests or action relating to the approval of such substitute material will be made until the request for substitution is made in writing by the contractor accompanied by complete data as to the equality of the material or article proposed. Such request shall be made in ample time to permit approval without delaying the work. 6-1.05 - Plant Inspection – The Engineer may inspect the production of materials, or the manufacture of products at the source of supply. Plant inspection, however, will not be undertaken until the Engineer is assured of the cooperation and assistance of both the contractor and the material producer. The Engineer or their authorized representative shall have free entry at all times to such parts of the plant as concerns the manufacture or production of the materials. Adequate facilities shall be furnished free of charge to make the necessary inspection. The City assumes no obligation to inspect materials at the source of supply. 565
2025 Ramp Replacement SP-13
6-1.06 - Testing – Unless otherwise specified, all tests shall be performed in accordance with the methods used by the California Department of Transportation, All tests that are performed shall be made by the Engineer or their designated representative.
Whenever a reference is made in the specifications to a test method by California Number, it shall mean the test method in effect on the day the Notice to Contractors for the work is dated.
Whenever a reference is made in the specifications to a specification or test designation either of the ASTM, the AASHO, Federal Specifications, or any other recognized national organization, and the number or other identification accompanying the test designation representing the year of adoption or latest revision if the test is omitted, it shall mean the test method in effect on the day the Notice to Contractors for the work is dated.
When requested by the Engineer, the contractor shall furnish, without charge, samples of all materials entering into the work, and no material shall be used prior to approval by the Engineer, except as provided in this Section. Samples of material from local sources shall be taken by or in the presence of the Engineer, otherwise the samples will not be considered for testing.
566
2025 Ramp Replacement SP-14
SECTION 7
LEGAL RELATIONS AND RESPONSIBILITY
7-1.01 - Laws To Be Observed – The contractor shall keep himself fully informed of all existing and future State and National laws and county and municipal ordinances and regulations which in any manner affect these engaged or employed in the work, or the materials used in the work, or which in any way affect the conduct of the work, and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. He or she shall at all times observe and comply with, and shall cause all their agents and employees to observe and comply with all such existing and future laws, ordinances, regulations, orders, and decrees of bodies or tribunals having any jurisdiction or authority over the work; and shall protect and indemnify the City and all officers and employees thereof connected with the work against any claim or liability arising from, or based on, the violation of any such law, ordinance, regulation, order, or decree.
7-1.02 - Hours of Labor – Eight hours labor constitutes a legal day’s work. The contractor shall forfeit, as a penalty to the City, $25.00 for each workman employed in the execution of the contract by the contractor or any subcontractor under them for each calendar day and 40 hours in any one calendar week in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815, thereof, inclusive, except that work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half times the basic rate of pay, as provided in said Section 1815.
7-1.03 - Labor Nondiscrimination - Attention is directed to Section 1735 of the Labor Code which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of their race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, or sex of such persons except as provided in Section 1420, and every contractor for public work violating this section is subject to all the penalties imposed for a violation of this chapter.”
7-1.04 - Prevailing Wage – In accordance with Section 1771 to 1774 of the Labor Code, for contracts in excess of one thousand dollars ($1,000) the contractor and all subcontractors under them shall pay all laborers, workmen, and mechanics on all work included in this contract no less than the general prevailing rate of per diem wages for work performed, (to-wit, within the limits if the City), and no less than the general prevailing rate of per diem wages for legal holiday and overtime work in said locality, which per diem wages shall not be less than the stipulated rate contained in a schedule thereof which has been ascertained and determined by the Council to be the general prevailing rate of per diem wages for each draft or type of workman or mechanic needed to execute this contract, and which is now on file with the City Clerk, as set forth in the Notice to Bidders, and by reference it is incorporated herein and made a part hereof.
The contractor shall forfeit, as a penalty to the City, twenty-five dollars ($25.00) for each laborer, workman, or mechanic employed for each calendar day or portion thereof such laborer, workman, or mechanic is paid less than the said stipulated rates for any work done under this contract by them or by any subcontractor under them in violation of Articles 1 and 2 of Chapter 1 Part 7 of Division 11 of the Labor Code of the State of California, and said sums and amounts which shall have been so forfeited pursuant to the herein paragraph and the said terms of said Labor Code shall be withheld and retained from payments due to the contractor under said contract, pursuant to this contract and the terms of said Labor Code; but no sum shall be so withheld, retained, or forfeited except from the final payment without a full investigation by either the Division of Labor Law Enforcement of the State Department of Industrial Relations or by said Council.
The difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day, or a portion thereof, for which each workman was paid less than the stipulated prevailing wage rate shall be paid to each workman by the contractor. The contractor shall comply with the provisions of Section 1775 of the Labor Code of the State of California.
567
2025 Ramp Replacement SP-15
The contractor and subcontractor shall keep accurate payroll records. Certified copies of payroll records shall be provided to the City and the Division of Labor Standards Enforcement of the Department of Industrial Relations in accordance with Section 1776 of the Labor Code of the State of California. 7-1.05 - Contractors Licensing Laws –Attention is directed to the provisions of Chapter 9 of Division 3 of the Business and Professions Code concerning the licensing of contractors.
All bidders and contractors shall be licensed in accordance with the laws of this state, and any bidder or contractor not so licensed, is subject to the penalties imposed by such laws. 7-1.06 - Permits and Licenses – The contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
The contractor shall obtain a permit for construction of a trench or excavation 5 feet or deeper, prior to beginning construction, from the State Industrial Relations Department.
If the Contract amount is in excess of $25,000, the contractor to whom award is made shall submit a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of any trench or trenches five feet or more in depth. If the plan varies from the shoring systems standards, the plan shall be prepared by a registered Civil or Structural Engineer. In no event shall shoring, sloping, or a protective system be allowed less effective than that required by construction safety orders. The City or its Engineer assume no responsibility for the Contractor’s plan. 7-1.07 - Patents – The contractor shall assume all costs arising from the use of patented materials, equipment, devices, or processes used on, or incorporated in, the work, and agrees to indemnify and save harmless the City and duly authorized representatives from all suits at law, actions of every nature for, or on account of the use f any patented materials, equipment, devices, or processes.
7-1.08 - Safety Provisions – The contractor shall conform to the rules and regulations pertaining to safety established by the California Division of industrial Safety. 7-1.09 - Public Convenience -- The contractor shall so conduct their operations as to offer the least possible obstruction and inconvenience to the public, and he or she shall have under construction no greater length or amount of work than he or she can prosecute properly with due regard to the rights of the public. Traffic control and access shall be in accordance with Subsection 7-1.08 of the Standard Specifications, except as herein provided.
The Contractor shall provide general construction signing. The Contractor shall be required to provide adequate signing and flagmen as described herein as required for their operations.
Unless otherwise provided in the special provisions, all public traffic shall be permitted to pass through the work with as little inconvenience and delay as possible.
Spillage resulting from hauling operations along or across any public traveled way, shall be removed immediately by the contractor at their expense.
Existing traffic signal and street lighting systems shall be kept in operation for the benefit of the traveling public during progress of the work, and other forces will continue routine maintenance of existing systems unless otherwise specified.
Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners.
Convenience access to driveways, houses, and buildings along the line of the work shall be maintained and temporary approaches to crossings or intersecting streets shall be provided and kept in good condition. When the abutting property owner’s access across the right-of-way lines is to be eliminated, or to be replaced under the contract by other access facilities, the existing access shall not be closed until the replacement access facilities are usable.
Culvert installation, or other underground pipe construction, shall be conducted on but one-half of the width of the traveled way at a time, and that portion of the traveled way being used by public traffic shall be kept open and unobstructed until the opposite side of the traveled way is ready for traffic. 568
2025 Ramp Replacement SP-16
The Contractor will be required to provide dust control for their operations. Water or dust palliative shall be applied as ordered by the Engineer for the alleviation or prevention of dust nuisance, The cost of dust control shall be considered as included in the cost of items for which there is a bid price.
In order to expedite the passage of vehicular traffic through or around the work, the contractor shall provide, erect, and maintain all necessary barricades, signs, danger signals, and lights for the protection of the work and the safety of the public. Roadways closed to traffic shall be protected be effective barricades, and signs and obstructions shall be illuminated at night. Suitable warning signs, illuminated at night by lanterns or flares, shall be provided.
Flagmen and guards, while assigned to traffic control, shall perform their duties and shall be provided with the necessary equipment in accordance with the current “Instructions to Flagmen” of the Department of Transportation of the State of California. The equipment shall be furnished and kept clean and in good repair by the contractor at their expense.
The contractor will be required to pay the cost of replacing or repairing all facilities installed for the convenience, direction, or warning of public traffic, that are lost while in their custody, or are damaged by reason of their operations.
Except as otherwise provided under this Section or in the Special Provisions, full compensation for conforming to the requirements of this Section shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefore. 7-1.10 - Public Safety - Whenever the contractor’s operations create a condition hazardous to traffic or to the public, he or she shall furnish, at their own expense and without cost to the City, such flagmen and guards as are necessary to give adequate warning to the public of any dangerous conditions to be encountered, and he or she shall furnish, erect, and maintain such fences, barricades, lights, signs, and other devices as are necessary to prevent accidents and avoid damage or injury to the public.
No material or equipment shall be stored where it will interfere with the free and safe passage of public traffic, and at the end of the day’s work, and at other times when construction operations are suspended for any reason, the contractor shall remove all equipment and other obstructions from that portion of the roadway open for use by public traffic.
Except as otherwise provided in this section or in the special provisions, compensation for conforming to all of the provisions in this section and in the special provisions, shall be considered as included in the prices paid for various contract items of work and no additional compensation will be allowed therefor. 7-1.10A - Flagging Costs – The cost of furnishing all flagmen and guards under “Public Convenience” will be borne by the contractor.
The provisions in this section shall in no way relieve the contractor from their responsibility for providing for the public’s convenience or safety, nor relieve the contractor from their responsibility for damage as provided under “Responsibility for Damage,” in this section.
7-1.11 - Preservation of Property – Due care shall be exercised to avoid injury to existing improvements or facilities, utility facilities, adjacent property, and trees and shrubbery that are not to be removed.
Trees and shrubbery that are not to be removed, and pole lines, fences, signs, markers and monuments, buildings, and structures, conduits, pipe lines (under or above ground) sewer and water lines, all street facilities, and any other improvements or facilities within or adjacent to the work shall be protected from injury or damage, and if ordered by the Engineer, the contractor shall provide and install suitable safeguards, approved by the Engineer, to protect such objects from injury or damage. If such objects are injured or damaged by reason of the contractor’s operations, they shall be replaced or restored at the contractor‘s expense.
The Engineer may make, or cause to be made, such temporary repairs as are necessary to restore to service any damaged street facility. The cost of such repairs shall be borne by the contractor and may be deducted from any monies due, or to become due, to the contractor under the contract.
The fact that any underground facility is not shown upon the plans shall not relieve the contractor of their 569
2025 Ramp Replacement SP-17
responsibility under this Section. It shall be the contractor’s responsibility to ascertain the existence of any underground improvements or facilities which may be subject to damage by reason of their operations.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and doing all the work involved in protecting or repairing property as above specified, shall be considered as included in the prices paid for various contract items of work and no additional compensation will be allowed therefor. 7-1.12 - Insurance – The contractor shall take out and maintain during the life of their contract, such Commercial General Liability and Property Damage Insurance as shall protect them, the City, the Engineer, and their agents from all claims for personal injury, including accidental death, as well as from all claims for property damage arising from operation under this contract. The amounts of such insurance shall be as hereinafter set forth.
The contractor shall require the subcontractors, if any, to take out and maintain similar Commercial General Liability and Property Damage Insurance.
In case any of the work under this contract is to be performed on, or at, the site of the project by the subcontractor, the contractor shall take out and maintain such contractor’s Contingent or Protective Insurance as will protect them, the City, and the Engineer from damage claims arising from the operations of any subcontractor. The amounts of such insurance shall be hereinafter set forth (see Exhibit “D” Insurance Provisions of the Sample Construction Contract).
As above provided, the contractor shall take and maintain:
7-1.12A - MINIMUM SCOPE OF INSURANCE - Coverage shall be at least as broad as:
1. Insurance Services Office form number GL 0002 (Ed. 1/73) covering Comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability; or Insurance Services Office Commercial General Liability coverage (“occurrence” from CG 0001).
2. Insurance Services office form number CA 0001 (Ed. 1/78) covering Automobile Liability, code 1 “any auto” and endorsement CA O025.
3. Workers’ Compensation insurance as required by the Labor Code of the State of California and Employers Liability insurance.
7-1.12B - MINIMUM LIMITS OF INSURANCE - Contractor shall maintain limits no less than the limits described in Exhibit “D”, Insurance Provisions of the Sample Construction Contract. 7-1.12C - DEDUCTIBLES AND SELF- INSURED RETENTION’S - Any deductibles or self-insured retention must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retention as respects the City, its officers, officials, employees and volunteers; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.
7-1.12D - OTHER INSURANCE PROVISIONS - The policies are to contain, or be endorsed to contain, the following provisions:
1. General Liability and Automobile Liability Coverage’s a. The City, its officers, officials, employees and volunteers are to be covered as insureds as respects:
liability arising out of activities performed by, or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers. b. The Contractor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance of self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. c. any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officials, employees or volunteers.
570
2025 Ramp Replacement SP-18
d. The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
2. Workers’ Compensation and Employers Liability Coverage - The insurer shall agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City.
3. All Coverages - Each insurance policy by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days’ prior written notice by certified mail, return receipt requested, has been given to the City. 7-1.12E - ACCEPTABILITY OF INSURERS - Insurance is to be placed with insurers with a Bests rating of no less than A:
VII.
If the contractor has fully satisfied the City of their responsibility and capacity under the workmen’s compensation laws, if any, to act as self-insurer, he or she may so act, and in such a case, the insurance required in the paragraph second above need not be provided.
In the event the form of any policy or certificate, or the amount of the insurance or the companies writing same are not satisfactory to the City, the contractor shall furnish other policies or certificates in form and amount, and with companies satisfactory to the City. The contractor shall not cause any policies to be canceled or permit it to lapse, and all policies shall include a clause to the effect that the policy or certificate shall not be subject to cancellation or to a reduction in the required limits of liability or amounts of insurance until notice has been mailed to the City stating when, not less than ten (10) days thereafter, such cancellation or reduction shall be effective. All certificates of insurance, authenticated by the proper officer of the insurer, shall state in particular those insured, the extent of the insurance, the location and operations to which the insurance applies, the expiration date, and the above-mentioned notice of cancellation clause.
The contractor shall furnish to the City at the date of delivering the signed contracts and bonds, certificates or riders duly executed on behalf of the surety company, certifying as to the amounts of insurance carried, and providing for the coverage therein of the City, their officers, agents, and employees, within all risks arising out of the project. 7-1.13 - Cooperation — Should construction be under way by other forces or by other contractors within or adjacent to the limits of the work specified, or should work of any other nature be under way by other forces within or adjacent to said limits, the contractor shall cooperate with all such other contractors or other forces to the end that any delay or hindrance to their work will be avoided. The right is reserved to perform other or additional work at or near the site at any time, by the use of other forces.
When two or more contractors are employed on related or adjacent work, each shall conduct their operations in such a manner as not to cause any unnecessary delay or hindrance to the other. Each contractor shall be responsible to the other for all damage to work, to person, or property caused to the other by their operations, and for loss caused the other due to their unnecessary delays or failure to finish the work within the time specified for completion 7-1.14 - Contractor’s Responsibility for the Work and Materials -- Until the acceptance of the contract, the contractor shall have the charge and care of the work and of the materials to be used therein, and shall bear the risk of injury, loss, or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The contractor shall rebuild, repair, restore, and make good all injuries, losses, or damage to any portion of the work or the materials occasioned by any cause before its completion and acceptance and shall bear the expense thereof, except for such injuries, losses, or damages as are directly and proximately caused by acts of the federal government or the public enemy. The suspension of work from any cause whatever shall not relieve the contractor of their responsibility for the work and materials herein specified. 7-1.14A - Responsibility for Damage – The City, Engineer, and all of their officers and employees thereof connected with the work, shall not be answerable or accountable in any manner; for any loss or damage that may happen to the work or any part thereof; for any loss or damage to any of the materials or other things used or employed in performing the work; for injury to or death of any person or persons either workmen or the public; or for damage to property from any cause which might have been prevented by the contractor, or their workmen, or anyone employed by them.
571
2025 Ramp Replacement SP-19
The contractor shall be responsible for any liability imposed by law, and for injuries to, or death of any person, or damage to property resulting from detects or obstructions, or from any cause whatsoever during the progress of the work, or at any time before its completion and final acceptance.
The contractor shall indemnify and save harmless the City, Engineer, and all of their officers and employees thereof connected with the work from all claims, suits, or actions of every name, kind, and description, brought for, or on account of, any injuries to or death of any person, or damage to property resulting from the construction of the work, or by or in consequence of any negligence in guarding the work, use of improper materials in construction of the work, or by or on account of any act or omission by the contractor or their agents during the progress of the work or at any time before its completion and final acceptance. 7-1.15 - Personal Liability – Neither the City, the Engineer, nor any other officer or authorized employee or agent of the City or Engineer, shall be personally responsible for any liability arising under or by virtue of the contract. Job safety is the sole responsibility of the Contractor.
7-1.16 - Apprentices – Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the California Labor Code concerning the employment of apprentices by the contractor or by any subcontractor under them. “Apprenticeable craft or trade,” as used in this section, shall mean a craftor trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the Apprenticeship Council. The joint apprenticeship committee shall have the discretion to grant a certificate exempting a contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met:
(a) In the event unemployment for the previous three-month period in such area exceeds an average of 15 percent; or
(b) In the event the number of apprentices in training in such area exceeds a ratio of l-to-5; or (c) If there is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either (1) on a statewide basis, or (2) on a local basis. (d) If assignment of an apprentice to any work performed under a public works contract would create a condition which would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or if the specific task to which the apprentice is to be assigned is of such a nature that training cannot be provided by a journeyman.
When such exemptions are granted to an organization which represents contractors in a specific trade from the 1- to-5 ratio on a local or statewide basis, the member contractors will not be required to submit individual applications for approval to local joint apprenticeship committees, provided they are already covered by the local apprenticeship standards.
A contractor to whom the contract is awarded, or any subcontractor under them, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade and who is not contributing to a fund or funds to administer and conduct the apprenticeship program in any such craft or trade in the area of the site of the public work, to which fund or funds other contractors in the area of the site of the public work are contributing, shall contribute to the fund or funds in each craft or trade in which he or she employs journeymen or apprentices on the public work in the same amount or upon the same basis and in the same manner as the other contractors do, but where the trust fund administrators are unable to accept such funds, contractors not signatory to the trust agreement shall pay a like amount to the California Apprenticeship Council. The contractor or subcontractor may add the amount of such contributions in computing their bid for the contract. The responsibility of compliance with this section for apprenticeable occupations is the prime contractors. 7-1.17 - Federal Requirements — Contractor is required to comply with all applicable standards, orders, or regulations pursuant to the Clean Air Act of 1970 (42 U.S.C. 1857 et req.) and the Federal Water Pollution Control Act (33 U.S.C. 1251 et req.) as amended.
7-1.18 - Female and Minority Goals
572
2025 Ramp Replacement SP-20
To comply with section II, "Nondiscrimination," of "Required Contract Provisions Federal-Aid Construction Contracts," the Department is including in section 7-1.11C female and minority utilization goals for federal-aid construction contracts and subcontracts that exceed $10,000.
The nationwide goal for female utilization is 6.9 percent.
The goal for minority utilization [45 Fed Reg 65984 (10/3/1980)] for Stanislaus County is 12.3 percent.
For each July during which work is performed under the Contract, you and each non-material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 (Appendix C to 23 CFR 230). Submit the forms by August 15.
7-1.19 - Federal Training Program
For the Federal training program, the number of trainees or apprentices is 0.
This section applies if a number of trainees or apprentices is specified in the special provisions.
As part of your equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved.
You have primary responsibility for meeting this training requirement.
If you subcontract a contract part, determine how many trainees or apprentices are to be trained by the subcontractor.
Include these training requirements in your subcontract.
Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training.
Distribute the number of apprentices or trainees among the work classifications on the basis of your needs and the availability of journeymen in the various classifications within a reasonable recruitment area.
Before starting work, submit to the City of Hughson:
Number of apprentices or trainees to be trained for each classification
1. Training program to be used
2. Training starting date for each classification
Obtain the City of Hughson’s approval for this submitted information before you start work. The City of Hughson credits you for each apprentice or trainee you employ on the work who is currently enrolled or becomes enrolled in an approved program.
The primary objective of this section is to train and upgrade minorities and women toward journeymen status.
Make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area. Show that you have made the efforts. In making these efforts, do not discriminate against any applicant for training.
Do not employ as an apprentice or trainee an employee:
1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman
2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training
Ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. Your records must show the employee's answers to the questions.
In your training program, establish the minimum length and training type for each classification. The City of Hughson and FHWA approves a program if one of the following is met:
573
2025 Ramp Replacement SP-21
1. It is calculated to:
Meet the your equal employment opportunity responsibilities Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period
2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federal-aid highway construction contracts
Obtain the State's approval for your training program before you start work involving the classification covered by the program.
Provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is allowed in lower level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training.
The City of Hughson reimburses you 80 cents per hour of training given an employee on this contract under an approved training program:
1. For on-site training
2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project and you do at least one of the following:
Contribute to the cost of the training
Provide the instruction to the apprentice or trainee
Pay the apprentice's or trainee's wages during the off-site training period
3. If you comply this section.
Each apprentice or trainee must:
1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill
2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program Furnish the apprentice or trainee:
1. Copy of the program you will comply with in providing the training
2. Certification showing the type and length of training satisfactorily completed 7-1.20 - Title VI Assurances:
During the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as CONTRACTOR) agrees as follows:
(1) Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement. (2) Nondiscrimination: CONTRACTOR, with regard to the work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment.
CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section
21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations.
574
2025 Ramp Replacement SP-22
(3) Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for work to be performed under a Subagreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR’S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. (4) Information and Reports: CONTRACTOR shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the California Department of Transportation or FHWA to be pertinent to ascertain compliance with such Regulations or directives.
Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the California Department of Transportation or the FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information.
(5) Sanctions for Noncompliance: In the event of CONTRACTOR’s noncompliance with the nondiscrimination provisions of this agreement, the California Department of Transportation shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
(a) withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or
(b) cancellation, termination or suspension of the Agreement, in whole or in part. (6) Incorporation of Provisions: CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.
CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the California Department of Transportation or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a sub-applicant or supplier as a result of such direction, CONTRACTOR may request the California Department of Transportation enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States.
575
2025 Ramp Replacement SP-23
SECTION 8
PROSECUTION AND PROGRESS
8-1.01 - Subcontracting — The contractor shall give their personal attention to the fulfillment of the contract and shall keep the work under their control.
No subcontractor will be recognized as such, and all persons engaged in the work of construction will be considered as employees of the contractor, and he or she will be held responsible for their work, which shall be subject to the provisions of the contract and specifications.
The contractor shall perform with their own organization, work of a value amounting to not less than 50 percent of the remainder obtained by subcontracting from the total original contract value the sum of any items that may be designated as “Specialty Items” in the special provisions. Where an entire item is subcontracted, the value of work subcontracted will be based on the contract bid price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated cost of such portion of the contract item, determined from information submitted by the contractor, subject to approval by the Engineer.
Before any work is started on a subcontract, the Contractor shall file with the Engineer at their office, a written statement showing the work to be subcontracted, giving the names of the subcontractors and the description of each portion of the work to be so subcontracted.
When a portion of the work which has been subcontracted by the contractor is not being prosecuted in a manner satisfactory to the Engineer, the subcontractor shall be removed immediately on the requisition of the Engineer and shall not again be employed on the work.
8-1.02 - Assignment — The performance of the contract may not be assigned, except upon the written consent of the Engineer. Consent will not be given to any proposed assignment which would relieve the original contractor or their surety of their responsibilities under the contract, nor will the Engineer consent to any assignment of a part of the work under the contract.
The contractor may assign moneys, due or to become due, to them under the contract and such assignment will be recognized by the City, if given proper notice thereof, to the extent permitted by law, but any assignments of moneys shall be subject to all proper set-offs in favor of the City and to all deductions provided for in the contract and particularly all money withheld, whether assigned or not, shall be subject to being used by the City for the completion of work in the event that the contractor should be in default therein. 8-1.03 - Beginning of Work — The contractor shall begin work within 30 calendar days after the contract has been approved by the attorney appointed and authorized to represent the City of Hughson, or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed, and shall diligently prosecute the same to completion within the time limit provided in the contract documents.
Should the contractor begin work in advance of receiving notice that the contractor has been approved as above provided, any work performed by them in advance of the said date of approval shall be considered as having been done by them at their own risk and as a volunteer unless said contract is so approved.
The delivery to the City, for execution and approval, of the contract properly executed on behalf of the contractor and surety shall constitute the contractor’s authority to enter upon the site of work and to begin operations, subject to their assumption of the risk of the disapproval of the contract, and subject also the following:
(1) Notice in writing of the contractors’ intention to start work prior to approval, specifying the date on which he or she intends to start, shall be given to the Engineer at least two working days in advance. (2) The contractor shall, on commencing operations, observe all provisions of the specifications relating thereto. (3) All work done according to the contract prior to its approval, will, when the contract is approved, be considered authorized work and will be paid for as provided in the contract. 8-1.04 - Temporary Suspension of Work — The City shall have the authority to suspend the work wholly or in part, 576
2025 Ramp Replacement SP-24
for such period as it may deem necessary, due to unsuitable weather, or to such other conditions as are considered unfavorable for the suitable prosecution of the work, or for such time as he or she may deem necessary due to the failure on the part of the contractor to perform a provision of the contract. The contractor shall immediately comply with the written order of the City to suspend the work wholly or in part. The suspended work shall be resumed when approved in writing by the City.
8-1.05 - Time of Completion — The contractor shall complete the work called for under the contract in all parts and requirements, within the number of calendar days set forth in the contract documents.
The current controlling operation, or operations, is to be construed to include any feature of the work considered at the time by the Engineer and the contractor, which, if delayed, will delay the time of completion of the contract. 8-1.06 - Liquidated Damages — It is agreed by the parties to the contract, that in case all the work called for under the contract in all parts and requirements is not finished or completed within the number of calendar days as set forth in the special provisions, damage will be sustained by the City, and that it is, and will be, impracticable and extremely difficult to ascertain and determine the actual damage which the City will sustain in the event of, and by reason of, such delay; and it is, therefore, agreed that the Contractor will pay to the City, the sum of one thousand dollars ($1,000) per day for each and every calendar day’s delay in finishing the work in excess of the number of days prescribed; and the contractor agrees to pay said Liquidated damages herein provided for, and further agrees that the City may deduct the amount thereof from any moneys due, or that may become due, the contractor under the contract.
It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the number of days specified, the City shall have the right to increase the number of days, or not, as may seem best to serve the interest of the City, and if they decide to increase the said number of days, they shall further have the right to charge the contractor, his or her heirs, assigns, or sureties and to deduct from the final payment for the work all or any part as it may deem proper, of the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to the contract, and which accrue during the period of such extension, except that cost of final surveys and preparation of final estimate shall not be included in such charges.
The contractor will be granted an extension of time and will not be assessed with liquidated damages or the cost of engineering and inspection for any portion of the delay in completion of the work beyond the time named in the special provisions for the completion of the work caused by acts of God or of the Public enemy, fire, floods, epidemics, quarantine restrictions, strikes, labor disputes, shortages of materials, and freight embargoes, provided that the contractor should notify the Engineer in writing of the causes of delay. The Engineer shall ascertain the facts and the extent of the delay, and their findings thereon shall be final and conclusive. 8-1.07 - Utilities — The right is reserved to the City and the owners of facilities, or their authorized agents, to enter upon the work for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties. The contractor shall cooperate with forces engaged in such work and shall conduct their operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by such other forces.
Attention is directed to the possible existence of underground facilities not known to the City in a location different from that which is shown on the plans or in the special provisions. The contractor shall take steps to ascertain the exact location of all underground facilities prior to doing work that may damage such facilities or interfere with their service.
The Contractor shall not interfere with the operations of any existing utility lines during the progress of the work. All utility pipes or lines, conduits, or structures encountered in, across, or near the trench excavation. The Contractor shall be responsible for any damage or injury to such pipes, conduits, or structures and shall replace and/or repair at their own expense any such damage or injury using like or equal materials as approved by the Engineer and the applicable utility company.
8-1.08 - City Right to Take Over the Work — If the contractor should be adjudged a bankrupt, or if he or she should make a general assignment for the benefit of their creditors, or if a receiver should be appointed to take over their 577
2025 Ramp Replacement SP-25
affairs, or if he or she should fail to prosecute the work with due diligence and carry the work forward in accordance with the work schedules and the time limits set forth in the contract documents, or if he or she should fail to substantially perform one or more of the provisions of the contract, including all provisions relating to equal employment opportunity, the City shall inform the contractor and their surety, stating its intention to exercise one of the remedies hereinafter set forth and the grounds upon which the City bases its right to exercise such remedy.
In any event, unless the matter complained of is satisfactorily cleared within ten days after service of such notice, the City may, without prejudice to any other right or remedy, exercise one of such remedies at once, having first obtained a certificate from the Engineer that sufficient cause exists to justify such action. (1) The City may terminate the services of the contractor, which termination shall take effect immediately upon service of notice thereof on the contractor and their surety, whereupon the surety shall have the right to take over and perform the contract. If the surety does not commence performance of the contract within ten days after service on surety of the notice of termination, the City may itself take over the work, take possession of and use all materials, tools, equipment, and appliances on the premises and prosecute the work to completion by such means as it shall deem best.
In the event of such termination of their service, the contractor shall not be entitled to any further payment under the contract until the work, is completed and accepted. If the City takes over the work and if the unpaid balance of the contract price when the City takes over the work exceeds the cost of completing the work, including compensation for any damage or expenses incurred by the City through the default of the contractor, such excess shall be paid to the contractor. In such event, if such cost expenses, and damages shall exceed such unpaid balance of the contract price, the contractor and their surety shall pay the difference to the City. Such cost, expenses, and damages shall be certified by the Engineer.
(2) The City may take control of the work and either make good the deficiencies of the contractor itself or direct the activities of the contractor in doing so, employing such additional help as the City deems advisable. In such event, the City shall be entitled to collect from the contractor and their surety, or to deduct from any payment then or thereafter due the contractor, the costs incurred by it through the default of the contractor, provided the Engineer approves the amount thus charged to the contractor.
(3) The City may require the surety on the contractor’s performance bond to take control of the work at once and see to it that all deficiencies of the contractor are made good with due diligence. As between the City and the surety the cost of making good such deficiencies shall all be borne by the surety. If the surety takes over the work, whether upon termination of the services of the contractor or upon instructions from the City to do so, the provisions of the contract shall govern in respect to the work done by the surety, the surety being substituted for the contractor as to such provisions of this section as to the right of the City to do the work itself or to take control of the work, 8-1.08A - Contractor’s Right to Stop Work or Terminate Contract — If the work shall be stopped under an order of any court or other public authority for a period of three months through no act or fault of the contractor or of anyone employed by them, then the contractor may on seven days’ written notice to the City and the Engineer, stop work or terminate this contract and recover from the City payment for all work executed, any losses sustained on any plant or material, and a reasonable profit. If the Engineer shall fail to issue any certificate for payment, without reasonable cause, within ten days after it is due, or if the City shall fail, without reasonable cause, to pay the contractor within fifteen days after its maturity and presentation any sum certified by the Engineer, then the contractor may on seven days’ written notice to the City and the Engineer stop work and given written notice of intention to terminate the contract. If the City shall thereafter fail to pay the contractor within seven days after receipt of such notice, then the contractor may terminate the contract and recover from the City payment for all work executed, any losses sustained upon any plant or materials, and a reasonable profit.
8-1.09 - Indemnify — The Contractor shall indemnify and save harmless the City, Engineer and their agents and employees, from and against all losses and all claims, demands, payments, suits, actions, recoveries, and judgements of every nature and description brought or recovered against them by reason of any act or omission of the said Contractor, their agents, or employees, in the execution of the Work or in making or failing to make payments therefor, or in guarding the same.
578
2025 Ramp Replacement SP-26
8-1.10 - Cost Of Living Council — Each Contractor will comply with the applicable regulations and standards of the Cost of Living Council in establishing wages and prices. The submission of a bid shall constitute a certification by them that amounts to be paid do not exceed maximum allowable levels authorized by the Cost of Living Council regulations or standards.
8-1.11 - Clean Air Act — If this contract exceeds $100,000, the Contractor shall comply with all applicable standards, orders, or regulations issued pursuant to the Clean Air Act of 1970. 8-1.12 - Contractual Restrictions — No member of or delegate to Congress, or Resident Commissioner, shall be admitted to any share of part of this contract or to any benefit that may arise therefrom, but this provision shall not be construed to extend to this contract is made with a corporation for its general benefit.
No official of the City who is authorized in such capacity and on behalf of the City to negotiate, make, accept or approve, or to take part in negotiating, making, accepting, or approving any architectural, engineering, inspecting, construction or material supply contract or any subcontract in connection with the construction of the project shall become directly or indirectly interested personally in this contract or in any part thereof. No officer, employee, architect, attorney, engineer, or inspector of or for the City who is authorized in such capacity and on behalf of the City who is in any legislative, executive, supervisory, or other similar function in connection with the construction of the project, shall become directly or indirectly interested personally in this contract, subcontract, insurance contract, or any other contract pertaining to this project.
579
2025 Ramp Replacement SP-27
SECTION 9
MEASUREMENT AND PAYMENT
9-1.01 - Measurement of Quantities – Measurement of quantities shall conform to the provisions of Section 9-1.01 of the Standard Specifications.
9-1.02 - Scope of Payment – The contractor shall accept the compensation provided in the contract as full payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to the completed work and for performing all work contemplated and embraced under the contract; also, for all loss or damage arising from the nature of the work, or from the action of the elements, or from any unforeseen difficulties which may be encountered during the prosecution of the work until the acceptance by the City, and for all risks of every description connected with the prosecution of the work: also, for all expenses incurred in consequence of the suspension or discontinuance of the work as provided in the contract; and for completing the work according to the plans and specifications.
Neither the payment of any estimate nor of any retained percentage shall relieve the contractor of any obligation to make good any defective work or material.
No payment will be made in any case for loss of anticipated profits. 9-1.02A - Payments for Work Completed – Partial payments will be made as the work progresses at the end of each calendar month, or as soon thereafter as practicable on estimates made by the Representative and as approved by the City, provided that the Contractor is performing the overall job in a diligent manner. In making partial payments, there shall be retained ten percent on the amount of each estimate until final completion and acceptance of all the Work.
For any moneys earned by the Contractor and withheld by the City to ensure the performance of the contract, the Contractor may, at their request and expense, substitute securities equivalent to the amount withheld in the form and manner and subject to the conditions provided in Chapter 13 (commencing with Section 4590), Division 5. Title I of the Government Code of the State of California.
Upon completion and acceptance of the Work, the Engineer shall issue a certificate that the Work has been substantially completed and accepted by them under the conditions of this Contract, and shall make and approve the final estimate of the Work. A Notice of Completion shall then be filed or recorded by City if permitted by law, in full compliance with the applicable statutory requirements. The entire balance found to be due the Contractor, including the retained percentage, but accepting such sums as may be lawfully retained by the City, shall be paid to the Contractor 35 days after the filing of the Notice of Completion. Such payment shall be conditioned, however, upon the submission by the Contractor of evidence satisfactory to the City that all claims for labor, material, and any other outstanding indebtedness in connection with the Contract have been paid.
If after the Work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor, and the Representative so certifies, the City shall upon the certificate of the Representative and, without terminating the Contract, make payment for the balance due for that portion of the Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claim.
Form entitled, “Partial Payment Estimate,” shall be used when estimating periodic payments due the Contractor. 9-1.03 - Force Account Payment – Work to be done by force account must be shown on a change order, approved prior to execution of the work, with a not-to-exceed amount shown on the change order. Once the work is complete, a subsequent change order may be executed to reduce the amount to that actually required. When extra work is to be paid for on a force account basis, the labor, materials, and equipment used in the performance of such work shall be subject to the approval of the Engineer and compensation will be determined as follows:
9-1.03A - Labor – The cost of labor used in performing the work, whether the employer is the contractor, subcontractor, or other forces, will be the sum of the following:
A. Actual Wages paid (including any employer payments to, or on behalf of, workmen for health and welfare, 580
2025 Ramp Replacement SP-28
pension, vacation, and similar purposes).
B. Labor Surcharge as set forth in the California Department of Transportation publication entitled “Equipment Rental Rates and General Prevailing Wage Rates”.
To the cost of Labor as described above, 20 percent will be added to contractor-performed work. If work is subcontracted, 20 percent will be added for the subcontractor and 5 percent for the contractor. 9-1.03B - Materials – The cost of materials incorporated in the work will be the cost to the purchaser, whether contractor, subcontractor, or other forces, from the supplier thereof, except as the following are applicable:
If a cash or trade discount by the actual supplier is offered or available to the purchaser, it shall be credited to the City not-withstanding the fact that such discount may not have been taken.
If materials are obtained from a supply or source owned wholly or in part by the purchaser, payment therefor will not exceed the price paid by the purchaser for similar materials furnished from said source on contract items or the current wholesale price for such material delivered to the job site, whichever is lower.
The City reserves the right to furnish such materials as it deems advisable, and the contractor shall have no claim for costs and profit on such materials.
To the cost of the materials as described above, 15 percent will be added. 9-1.03C - Equipment Rental – The equipment rental rates shall be these:
A. Published monthly by the State of California, Department of Transportation, for the month of the date of the proposal.
B. Construction Equipment Rented from Third Parties -- Charges will be made for construction equipment rented from third parties only if the Engineer determines that such equipment is necessary for the proper prosecution to the force account work, and that neither the contractor nor any of their subcontractors has such equipment on the work. Such charges will consist of: the rental paid for the equipment up to the current prevailing rental rate for such equipment rental details in the area of the work; the charges for moving the equipment to and from the force account work, and payments made for equipment operators, if the equipment must be rented with operators and the cost thereof is not included in the rental rate.
C. To the cost of equipment rental as described above, 15 percent will be added. 9-1.03D - Records – The contractor shall maintain their records in such a manner as to provide a clear distinction between the direct costs of extra work paid for on a force account basis and the costs of other operations.
The contractor shall furnish the Engineer report sheets in duplicate of each day’s extra work paid for on a force account basis no later than seven (7) days following the performance of said work. The daily report sheets shall itemize the materials used, and shall cover the direct cost of labor and the charges for equipment rental, whether furnished by the contractor of subcontractor. The daily report sheets shall provide names or identifications and classifications of workmen, the hourly rate of pay, and hours worked, and, also, the size, type, and identification number of equipment and hours operated.
Materials charges shall be substantiated by valid copies of vendors invoices. Such invoices shall be submitted with the daily report sheets.
Said daily report sheets will be signed by the contractor or their authorized agent.
The Engineer will compare their records with the daily report sheets furnished by the contractor, make any necessary adjustments, and compile the costs of work paid for on a force account basis. 9-1.04 - Maintenance – Neither the final certificate, final payment, nor any provision in the contract shall relieve the contractor of responsibility for faulty materials or workmanship, and he or she shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which may appear or be discovered up to one year after recording or filing of the Notice of Completion, or one year after final payment, if, for any reason, no Notice of 581
2025 Ramp Replacement SP-29
Completion was timely recorded or filed. During the first 30 days of this period, the contractor shall clean out any lines or structures that have become plugged with dirt or debris. The City shall give notice of observed defects with reasonable promptness, and the contractor shall proceed to remedy such defects immediately upon receiving such notification. Payment due the Engineer by the City for extra service required in the enforcement of the contractor’s guarantees after acceptance of the work, shall be paid to the City by the contractor or their surety. 9-1.05 - Liens or Claims – If at any time there shall be evidence of any lien or claim for which the City might become liable and which is chargeable to the contractor, the City shall have the right to retain out of any payment then due or thereafter to become due, an amount sufficient for complete indemnification against such lien or claim. If the City has already paid to the contractor all sums due under this contract, or if the balance remaining unpaid is insufficient to protect the City, the contractor and their surety shall be liable to the City for any loss so sustained. 582
Technical Specifications TS-1
TECHNICAL SPECIFICATIONS
DIVISION 1 – GENERAL
Section 01 01 10 General Paragraphs .............................................................................. TS-2 DIVISION 2 – SITE CONSTRUCTION
Section 02 74 00 Asphalt Concrete Pavement ....................................................... 02 74 00-1 Section 02 75 00 Concrete Sidewalks, Curbs, and Gutters .................................... 02 75 00-1
583
Technical Specifications TS-2
DIVISION 1 – GENERAL
Section 01011
GENERAL PARAGRAPHS
1. General
The contractor shall furnish all labor, equipment, materials, and service necessary to construct the work shown on the drawings and in the manner described in these specifications. All equipment and materials furnished and installed shall be new.
2. Equals
It is the intention of this specification to allow the contractor to offer to supply either the material specified, or a suitable equivalent. The Engineer will determine whether the material offered as a substitute is equivalent to that specified and the contractor shall obtain permission in writing from the Engineer before making substitution.
3. Condemned Materials and Workmanship
Any materials failing to meet specifications shall be removed from work at once. Any employee of the contractor performing his work contrary to the specifications shall be discharged and not re-employed. No work will be considered as accepted because the Engineer fails to point out its deficiencies. The contractor shall correct any imperfect work whenever discovered.
4. Inspection and Testing
Inspections, tests, or approvals by the Engineer or others shall not relieve the contractor from his obligations to perform the work in accordance with the requirements of the contract documents.
The Owner shall pay for initial compaction testing. The contractor shall pay for all other compaction tests which are in areas which failed the initial compaction test. The contractor shall also pay the cost incurred by the Engineer for inspecting repairs, inspecting and observing retesting, etc., and inspecting all other work which previously failed to conform to the contract. These cost will be deducted from monies due or to become due to the contractor, and will be determined from the Engineer’s records.
Payment for repair and all other testing, including all labor, materials, tools, and equipment, of any work to be done by the contractor, shall be included in the cost of the work in place.
The Engineer and his representatives will at all times have access to the work. In addition, authorized representatives and agents of any participating government agency shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices of materials, and other relevant data and records. The contractor will provide proper facilities for such access and observation of work and, also, for any inspection, or testing thereof.
If any work is covered contrary to the instructions of the Engineer, it must, if requested by the Engineer, be uncovered for his observation and replaced at the contractor’s expense.
In the event the contractor elects to work on a Saturday, Sunday, or legal holiday, the contractor shall notify the Engineer in advance in order that inspection may be performed. The contractor shall pay Owner’s expense of providing such special inspection on a Saturday, Sunday, or legal holiday.
If the Contractor elects to work more than 8 hours a day, the Contractor shall pay the Owner for the difference between the normal charge rate for the inspector and the inspector’s overtime charge rate.
No work shall be done at night without the prior written approval of the Engineer. 584
Technical Specifications TS-3
Two working days’ notice shall be given before a test is made, and no test shall be made without the presence of the Engineer or his authorized representative.
5. Time of Completion
The contractor shall plan the work and prosecute the same with such diligence that said work shall commence within 10 days after the Notice to Proceed is received, and it shall be completed within the time period set forth in the Construction Agreement.
6. Permits
The contractor shall obtain at his own expense, all necessary permits and comply with all requirements of the permits at his sole expense. The contractor shall obtain a City Business License and a City Encroachment Permit.
7. Shop Drawing Submittals
Submittals shall be made for materials and equipment so the Engineer can examine the submittals for compliance with the plans and specifications. Each submittal shall be accompanied by a letter or form indicating the following:
1. Submittal No.
2. Date of Submittal.
3. Contractor’s Company Name.
4. Contractor’s Signature (or authorized rep.)
5. Description of Submitted Item.
Submittals may be made within 10 working days of the approval of the contract. However, submittals shall not be made within 15 working days prior to installation of the item submitted for review. Contractor shall submit 3 copies of submittals. Electronic submittals are acceptable where materials samples are not required.
8. Easements
Where the proposed work lies within or near an easement on private property, the Contractor shall take care not to disturb any more property than is necessary and to restore conditions to their original state after completion, including replacement of fences, bushes, pipelines, etc. at his sole expense.
9. Shoring, Sheeting, and Bracing
Attention is directed to Section 5-1.02A “Trench Excavation Safety Plans,” and 7-1.01E, “Trench Safety,” of the Standard Specifications and these Special Provisions. Engineer will not be responsible for approving the Contractor’s detailed plan for worker protection as stated in Section 5-1.02A. Safety is the sole responsibility of the Contractor.
10. Cleanliness of Premises
During the progress of the work, the contractor shall keep the premises reasonably clean. The premises shall be kept and left free of all debris.
11. Materials, Fittings, and Equipment
All materials, fittings, and equipment used in the installation of the work shall be new when installed and in excellent condition when the job is completed.
12. Cleanup
Upon completion of the work and before making application for final inspection of the work, the contractor shall clean all ground occupied by him, in connection with the work, of all rubbish, debris, excess materials, temporary structures, and equipment. All portions of the work shall be left in a neat and sightly condition. Nothing in this 585
Technical Specifications TS-4
section, however, shall require or permit the contractor to remove warning or directional signs prior to formal acceptance by the Owner.
13. Construction Staking
The Engineer will provide the following construction staking: Locations, line and grade stakes for curb, gutter, sidewalk, driveways, catch basins, storm drain line, and survey monuments will be staked upon request by contractor.
Contractor shall provide a worker to assist the Inspector in checking subgrade and base elevations in the reconstruction area.
14. Record Drawings
The Contractor shall maintain at the job site, two sets of full-size contract drawings marked to show any deviations which have been made from the contract drawings including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the contract drawings. Upon completion of the work, the marked sets of prints shall be delivered to the Engineer. Requests for partial payments will not be approved if the marked prints are not kept current, and request for final payment will not be approved until the marked prints are delivered to the Engineer.
15. Order of Work
Contractor shall submit proposed schedule and order of work for project construction to Engineer for review within ten (10) working days of the approval of the contract.
Contractor shall establish communication with property owners affected by construction and shall cooperate with them to minimize disruption of their operations due to construction.
16. Plans
The following drawings, including standard drawings, are referred to in these Specifications and Contracts as the Plans. Said Plans are attached hereto and are an integral part of the Contract.
Title: (a). 2025 RAMP REPLACEMENT
* * * *
586
Technical Specifications Section 02 74 00‐1
Section 02 74 00
ASPHALT CONCRETE PAVEMENT
PART ONE – GENERAL
1.01 APPLICABLE PUBLICATIONS
A. The following publications of the issues listed below, but referred to hereinafter by basic designation only, form a part of this specification to the extent required by the references thereto:
B. State of California, Department of Transportation, Standard Specifications for Road Construction, July 1992.
C. American Society for Testing and Materials (ASTM):
D 1557‐78 Test for Moisture‐Density Relations of Soils Using 10‐lb. Rammer and 18‐inch Drop (Method D).
D 2922‐78 Density of Soil and Soil‐Aggregate in Place by Nuclear Methods (Shallow Depth).
D 3017‐78 Moisture Content of Soil and Soil‐Aggregate in Place by Nuclear Methods(Shallow Depth).
1. Federal Specifications (Fed. Spec.): FS TT‐P‐ISC Paint, Traffic, Highway, White and Yellow.
1.02 STATE STANDARD SPECIFICATION
A. Whenever this specification is referenced, the following is understood:
B. When the term “commission” or “Department” occurs, it shall mean the Owner. Whenever the term “Director” or “Executive Officer” occurs, it shall mean the City Manager.
C. Whenever the term “Engineer” occurs, it shall mean the Engineer of this project.
D. Whenever a discrepancy occurs, it shall mean the Engineer of this project.
E. All references to measurement and payment are deleted.
1.03 SUBMITTALS
A. General: Preparation of mix design, sampling, and testing of materials and equipment for compliance with the specifications shall be made by the Contractor. The samples shall be properly marked to show the name of the material, name of the supplier, contract number and the segment of the work where the material represented by the sample is to be used. Sampling and test methods shall be in accordance with procedures of the applicable publications and the State Materials Manual. If material supplied from a commercial pug mill or mixing plant has been sampled and tested by an independent engineering testing laboratory during the last 6 months from the time of contract award, certified copies of tests specified herein for the material being furnished may be submitted in lieu of the specified conformance tests. Copies of weigh‐master’s certificates or certified delivery ticketsfor each truck load of materialshall result in the Contractor providing physical evidence (corings, etc.) which clearly show that the material has the proper thickness.
1.04 SUBGRADE
A. Requirements for subgrade are specified in Section 02 20 00, Earthwork. Prior to construction of base course and asphaltic concrete, clean previously constructed subgrade, or sub‐base of all 587
Technical Specifications Section 02 74 00‐2
foreign substances. The surfaces shall be inspected for the specified compaction and trueness to line and grade.
1.05 REQUIREMENTS
A. General: The aggregate base, tack coat, and bituminous course or overlay and traffic control shall conform to the requirements of the Standard Specifications for Road Construction, State of California Department of Transportation, current edition.
PART TWO – PRODUCTS
1.01 MATERIALS
A. Aggregates: The grading and proportioning of aggregates shall be such that the combined mineral aggregate conforms to the specified requirements.
1. Aggregates for base course shall conform to Section 26 of the Standard Specifications, Class 2 for ¾‐inch maximum gradation.
2. Aggregatesfor asphaltic concrete shall conform to Section 39 of the Standard Specifications, Type B for individual test result conforming to ½‐inch maximum size gradation, medium.
B. Asphaltic Materials:
1. Asphaltic Emulsion, (RS‐1), shall conform to Section 94 of the Standard Specifications.
2. Striping: Traffic striping shall be thermoplastic and shall conform to section 84.2 of the standard specs.
PART THREE – CONSTRUCTION
3.01 CONSTRUCTION
A. Base Course:
1. Aggregate base shall be place in accordancewith requirements of Section 26 of the Standard Specifications and to the thickness shown. The materials shall be graded and compacted in maximum 4‐inch layers to at least 95 percent of maximum density (ASTM D 1557).
2. Maintenance: The base course shall be maintained until the asphaltic pavement is in place.
Maintenance shall include drainage, rolling,shaping, and water as necessary to maintain the course in proper condition. Sufficient moisture shall be maintained at the surface to prevent a dusty condition by light sprinkling with water. Areas of completed base course that are damaged by freezing shall be conditioned, reshaped and re‐compacted in accordance with the requirements of this specification, without additional cost to the Owner.
B. Paint Binder: Asphaltic emulsion shall be applied to the existing pavement surface, in accordance with Section 39 of the Standard Specifications to the exposed edges and surfaces of the existing pavement and concrete against which asphaltic concrete is to be placed. Existing surfaces shall be clean of dirt, grease, etc. which would prevent bond of new pavement to existing.
C. Saw‐cutting of Asphalt Pavement: Use saw capable of cutting a minimum of 1‐1/2 inches in depth. Mark cut lined precisely with chalkline. On trenches saw‐cut must be a minimum of 12 inches wider (6 inches each side) than trench width. Saw along line to provide a neat, uniform straight cut. Re‐cut at Contractor’s expense all edges that become broken or damaged.
D. Asphalt Concrete:
588
Technical Specifications Section 02 74 00‐3
1. All materials shall be furnished by the Contractor. The bituminous concrete shall consist of mineral aggregate, uniformly mixed with bituminous material in a central plant in accordance with Section 39 of the Standard Specifications. The mixing plant and construction equipment shall conform to the requirements of Section 39.
2. Placing: Bituminous mixtures shall be delivered to the roadbed at temperatures specified in the Standard Specifications. Spreading of the mixture shall be in accordance with Section 39 of the Standard Specifications. All loads shall be covered with tarpaulin or other material during transportation, if needed to preserve heat.
3. Compaction: Initial or breakdown rolling and the final rolling of the uppermost layer of the asphalt concrete shall be compacted in accordance with Section 39 of the Standard Specification Compaction by vehicular traffic shall not be permitted.
4. Joining Pavement: the joints between old and new pavements or between successive days’ work shall be carefully made in such a manner as to insure a continuous bond between old and new sections of the course. Edges of existing pavement shall be exposed and cleaned, and edges cut to straight, vertical surfaces. All joints shall be painted with a uniform coat of tack coat before the fresh mixture is placed.
5. Protection of Pavement: After final rolling, no vehicular traffic of any kind shall be permitted on the pavement until it has cooled and hardened.
3.01 STRIPING
A. Replace existing striping with thermoplastic in accordance with section 84.2 of the standard specifications.
B. Cleaning: Sweep surface to remove loose material, contaminants, and dirt. Do not begin marking pavement until it is acceptable to Engineer.
C. Apply thermoplastic with mechanical equipment equipped with guide painter and metering device adequate to determine quantity of thermoplastic being applied. Apply at uniform rate of
0.20 16/ft of 4” wide stripe for extended thermoplastic and 0.13 16/ft of 4” wide stripe for sprayable thermoplastic. Provide uniform straight edges. Use approved stencils for arrows, letters, and other symbols. Color shall be same as existing or as shown on the improvement plans..
3.03 INSPECTION OF PLANT AND EQUIPMENT
A. The Engineer shall have access at all times to all parts of the batch plant for checking the adequacy of the equipment in use, inspecting the operation of the plant, verifying weight, proportions, and character of materials and checking temperatures being maintained in the preparation of the mixtures.
3.04 TESTING
A. Compaction density testing shall be measured in accordance with ASTM D 2922 and D 3017 and shall be taken at locations selected by Engineer.
* * * *
589
Technical Specifications Section 02 75 00‐1
Section 02750
CONCRETE SIDEWALK, CURBS, AND GUTTERS
PART ONE ‐ GENERAL
1.01 SECTION INCLUDES
A. Concrete paving, curbs, and mow strips.
B. Thickened edge.
1.02 RELATED SECTIONS
A. Section 01 40 00 ‐ Quality Requirements, field samples.
B. Section 02 30 00 ‐ Earthwork, preparation of site for paving.
C. Section 02 33 50 ‐ Subgrade and Roadbed, subgrade, and base preparation.
D. Section 03 10 00 ‐ Concrete Forms and Accessories.
E. Section 03 20 00 ‐ Concrete Reinforcement.
F. Section 32 13 13 ‐ Concrete Paving.
G. Section 32 14 13 ‐ Precast Concrete Unit Paving.
1.03 PRICE AND PAYMENT PROCEDURES
A. Payment of the various Construction Items described in the Schedule of Values shall be considered full compensation for work of this Section.
B. Paving shall be measured edge to edge. Thickened edges or thickened slab sections shall be considered as incidental to paving bid items except that turn down slab edges shall be in addition to the edge‐to‐edge measurement.
C. Payment for thickened edges shall include all work in addition to slab of which the turn down edge is a part.
1.04 REFERENCES
A. ACI 211.1 ‐ Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete; American Concrete Institute International; 1991 (Reapproved 2002).
B. ACI 301 ‐ Specifications for Structural Concrete for Buildings; American Concrete Institute International; 2005.
C. ACI 302.1R‐4 ‐ Guide for Concrete Floor and Slab Construction.
D. ACI 304R ‐ Guide for Measuring, Mixing, Transporting, and Placing Concrete; American Concrete Institute International; 2000.
E. ACI 305R ‐ Hot Weather Concreting; American Concrete Institute International; 1999.
F. ACI 306R ‐ Cold Weather Concreting; American Concrete Institute International; 1988 (Reapproved 2002).
G. ASTM A 615/A 615M ‐ Standard Specification for Deformed and Plain Billet‐Steel Bars for Concrete Reinforcement; 2009b.
H. ASTM C 33 ‐ Standard Specification for Concrete Aggregates; 2008. 590
Technical Specifications Section 02 75 00‐2
I. ASTM C 39/C 39M ‐ Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens; 2009a.
J. ASTM C 94/C 94M ‐ Standard Specification for Ready‐Mixed Concrete; 2009a.
K. ASTM C 150 ‐ Standard Specification for Portland Cement; 2007.
L. ASTM C 260 ‐ Standard Specification for Air‐Entraining Admixtures for Concrete; 2006.
M. ASTM C 309 ‐ Standard Specification for Liquid Membrane‐Forming Compounds for Curing Concrete; 2007.
N. ASTM C 494/C 494M ‐ Standard Specification for Chemical Admixtures for Concrete; 2008a.
O. ASTM C 618 ‐ Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete; 2008a.
P. ASTM D 1751 ‐ Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (nonextruding and Resilient Bituminous Types); 2004 (Reapproved 2008).
1.05 SUBMITTALS
A. See Section 01 01 10 ‐ General Paragraphs.
B. Product Data: Provide data on joint filler, admixtures, curing compound, and accessories.
C. Design Data: Indicate pavement thickness, designed concrete strength, reinforcement, and typical details. Allow 10 days for review by Owner's testing service.
D. Certificate of Compliance: Submit certification by the materials and mix producers indicating that the materials and mixes are in compliance with these specifications. Certification shall be signed by the material and mix producers.
E. Batch Tickets: Conform to ASTM C94.
F. Placement Record.
1.06 QUALITY ASSURANCE
A. Owner may employ the services of independent inspection and testing agencies for inspections and tests required for work of this Section. Contractor shall comply with requirements of the agencies during execution of the work.
B. Perform work in accordance with ACI 301.
C. Comply with City and Caltrans standard specifications as applicable.
D. Acquire cement and aggregate from same source for all work.
E. Installer Qualifications: Company specializing in performing the work of this section with minimum 10 years related experience and demonstrative experience on at least 5 successful projects of a similar scope to this project. Submit applicators/contractors resume of successful projects utilizing specified concrete color system.
PART TWO ‐ PRODUCTS
2.01 PAVING ASSEMBLIES
591
Technical Specifications Section 02 75 00‐3
A. Comply with applicable requirements of ACI 301.
B. Conform to City Standards.
2.02 FORM MATERIALS
A. Form Materials: Conform to ACI 301.
B. Joint Filler: Preformed; non‐extruding bituminous type (ASTM D 1751).
1. Thickness: 1/2 inch.
2.03 REINFORCEMENT
A. Reinforcing Steel: ASTM A 615/A 615M Grade 40 (280); deformed billet steel bars; unfinished finish.
B. Dowels: ASTM A 615/A 615M Grade 40 (280); deformed billet steel bars; unfinished finish.
2.04 CONCRETE MATERIALS
A. Obtain cementitious materials from same source throughout.
B. Cement: ASTM C 150 Normal ‐ Type I portland type, grey color.
C. Fine and Coarse Mix Aggregates: ASTM C 33.
D. Fly Ash: ASTM C 618, Class C or F.
E. Water: Clean, and not detrimental to concrete.
F. Air Entrainment Admixture: ASTM C 260.
G. Chemical Admixtures: ASTM C 494/C 494M, Type A ‐ Water Reducing, Type C ‐ Accelerating, and Type G ‐ Water Reducing, High Range and Retarding.
2.05 ACCESSORIES
A. Curing Compound: ASTM C 309, Type 1, Class A.
1. Acceptable Products:
a. 1100‐Clear, by WR Meadows, Inc, www.wrmeadows.com, or equal.
B. Joint Sealant: Sonolastic Paving Joint Sealant by Sonneborn or approved equal conforming to ASTM C920.
1. Horizontal Conditions: Sonolastic SL1.
2. Color: Provide manufacturer's full range of available colors to Landscape Architect for selection.
C. Dowel Alignment:
1. Speed Dowel system by Greenstreak. Size per plans.
2. Diamond Dowl System by PNA, Plate size and spacing per ACI 302.1R‐04.
2.06 CONCRETE MIX DESIGN
A. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates recommended by manufacturer.
B. Concrete Properties:
592
Technical Specifications Section 02 75 00‐4
1. Conform to City standards.
2. Compressive Strength, when tested in accordance with ASTM C 39/C 39M at 28 days: As scheduled.
3. Maximum Slump: 3 inches.
4. Maximum Aggregate Size: 3/4 inch.
2.07 MIXING
A. Transit Mixers: Comply with ASTM C 94/C 94M.
2.08 SOURCE QUALITY CONTROL
A. Submit proposed mix design of each class of concrete to Landscape Architect for review prior to commencement of work.
B. Tests on cement and aggregates will be performed to ensure conformance with specified requirements.
C. Test samples in accordance with ACI 301.
PART THREE ‐ EXECUTION
3.01 EXAMINATION
A. Verify compacted subgrade is acceptable and ready to support paving and imposed loads.
B. Verify gradients and elevations of base are correct.
C. Start of Work of this Section will indicate Contractor's acceptance of existing conditions.
3.02 SUBBASE
A. See Section 02335 for construction of base course for work of this Section.
3.03 PREPARATION
A. Moisten base to minimize absorption of water from fresh concrete.
B. Adjust utility boxes, risers, lids, and other appurtenances as required to meet and match proposed surface finish grade.
3.04 FORMING
A. Place and secure forms to correct location, dimension, profile, and gradient.
B. Form curves at constant, true radius. Straight steel forms shall not be used to form curves.
C. Allow time for adequate review by Landscape Architect or Designated Representative prior to scheduling pour and placement of concrete. Accommodate these reviews into the project schedule.
D. Construct formwork to extend from the surface design elevation to the full depth of the paving cross section. Do not allow forms to extend above design elevations.
E. Place dowel system according to manufacturer's recommendations.
3.05 PLACING CONCRETE
593
Technical Specifications Section 02 75 00‐5
A. Place concrete in accordance with ACI 304R.
B. Ensure reinforcement, inserts, embedded parts, formed joints are not disturbed during concrete placement.
C. Place concrete continuously over the full width of the panel and between predetermined construction joints. Do not break or interrupt successive pours such that cold joints occur.
3.06 JOINTS
A. General:
1. Accurately construct joints to the design lines indicated on the Drawings.
2. Align curb, gutter, and sidewalk joints.
3. Joints at walkway intersection shall be laid out as directed in the field. Mark joint locations on forms for review prior to placement of concrete. Adjust as directed.
4. Joints along walkways between intersections shall be located at equal intervals at a distance approximately equal to the width of the walk.
B. Isolation Joints:
1. Place isolation joints as indicated on Drawings.
2. Place joint filler vertical in position, in true to design lines. Secure to formwork during concrete placement to resist movement by wet concrete.
3. Place joint filler between paving components. Recess top of filler 1/4‐ inch or to bottom of tooled radius.
C. Control Joints:
1. Construct as indicated on the Drawings.
2. Control joints shall be tooled with a standard tool. Tool shall leave rounded edges and shall completely separate aggregate the full depth of the joint.
D. Cold Joints:
1. Construct as indicated on the Drawings.
2. Plan execution of work so that cold joints occur at predetermined joint locations as shown on drawings and as required.
3.07 FINISHING
A. Vehicular Paving: Light broom, texture perpendicular to pavement direction.
B. Sidewalk Paving: Light broom, texture perpendicular to direction of travel with troweled and radiused edge 1/2‐inch radius.
C. Place curing compound on exposed concrete surfaces immediately after finishing. Apply in accordance with manufacturer's instructions.
3.08 TOLERANCES
A. Maximum Variation of Surface Flatness: 1/4 inch in 10 ft.
B. Maximum Variation From True Position: 1/4 inch.
594
Technical Specifications Section 02 75 00‐6
3.09 FIELD QUALITY CONTROL
A. All testing to conform to City standards.
B. Observations: Notify Landscape Architect at the following points during the progress of the Work.
No subsequent Work shall be executed until Landscape Architect has had the opportunity to observe the condition and status of the Work.
1. When field samples are ready for review.
2. Forms: When forms, base material, and embedded items are in place.
C. Testing:
D. Appointed testing agency will take cylinders and perform slump and air entrainment tests in accordance with ACI 301.
E. Three concrete test cylinders will be taken for every 100 or less cubic yards of each class of concrete placed each day.
F. One additional test cylinder will be taken during cold weather and cured on site under same conditions as concrete it represents.
G. One slump test will be taken for each load of concrete upon delivery. Perform air entrainment test with each slump test.
H. Contractor shall maintain records of placed concrete items. Record date, location of pour, quantity, air temperature, and test samples taken.
3.10 PROTECTION
A. Immediately after placement, protect pavement from premature drying, excessive hot or cold temperatures, and mechanical injury.
3.11 CLEANING
A. Clean concrete of efflorescence in accordance with manufacturer's instructions.
B. Ensure concrete has sufficiently cured before cleaning.
C. Use concrete cleaner approved by pigment manufacturer and Landscape Architect. Do not use cleaners containing acid.
D. Apply cleaner in accordance with cleaner manufacturer’s instructions. * * * *
595
1:10 MAX
1:10 MAX TRUNCATED DOME DETECTABLE WARNING SURFACE
4' EXPANSION JOINT WEAKENED JOINTS OR COLD JOINTS (TYP)
4.00'
5.00' STD GUTTER PAN CROSS SLOPE 5' GUTTER PAN CROSS SLOPE TRANSITION 5% MAX GUTTER PAN CROSS SLOPE 5% MAX GUTTER PAN CROSS SLOPE STD GUTTER PAN CROSS SLOPE PLAN VIEW SECTION A-A 4' MIN 1:12 MAX 6" NATIVE SOIL AT 6" NATIVE SOIL AT 90% COMPACTION 95% COMPACTION FLUSH NOTES: 1. THE LOWER END OF THE RAMP SHALL BE FLUSH WITH THE GUTTER PAN. 2. TRANSITION GUTTER PAN CROSS SLOPE TO 5% MAX 4' OUTSIDE OF BOTTOM OF RAMP. 3. IF THE DISTANCE FROM THE BACK OF THE SIDEWALK TO THE BACK OF THE RAMP IS LESS THAN 4 FEET, THEN THE SLOPE OF THE FLARED SIDES SHALL NOT EXCEED 1:12.
A
A
4' MIN
5% MAX IN GUTTERTRUNCATED DOME DETECTABLE WARNING SURFACE 4' MIN PROPERTY LINE/ BACK OF SIDEWALK WEAKENED JOINTS OR COLD JOINTS (TYP)
4.00'
5.00' STD GUTTER PAN CROSS SLOPE 5' GUTTER PAN CROSS SLOPE TRANSITION 5% MAX GUTTER PAN CROSS SLOPE 5% MAX GUTTER PAN CROSS SLOPE STD GUTTER PAN CROSS SLOPE PLAN VIEW SECTION A-A 5.00' 1:12 MAX AT BACK OF RAMP (BOTH SIDES) 6" (MAX) RETAINING CURB NOTES: 1. THE LOWER END OF THE RAMP SHALL BE FLUSH WITH THE GUTTER PAN. 2. TRANSITION GUTTER PAN CROSS SLOPE TO 5% MAX 4' OUTSIDE OF BOTTOM OF RAMP.
A
A
2% MAX FLUSH P.L. 6" (MAX) RETAINING CURB
5% MAX IN GUTTER
JOB NO.
DATE
SCALE
DR. BY
CK. BY
FILE: SHEET OF SHEETS
24-C08
05/14/2025
AS SHOWN
NBS
RM
1 ENGINEERING
PREPARED UNDER THE DIRECTION OF :
NICKLAUS B. STEPHENS R.C.E. C91352 EXP. 9-30-26
w w w . m c r e n g . c o m
MCR ENGINEERING, INC.
1242 DUPONT COURT
MANTECA , CA 95336
TEL :
FAX :
( 209 ) 239 - 6229
( 209 ) 239 - 8839
DATE
PLAN REVISIONS
DATE NO. DESCRIPTIONS
2025 RAMP REPLACEMENT
HUGHSON, CALIFORNIA
1 2
3 4
5 6
7 HUGHSON/1-PUBLIC WHITMORE AVE FOX RD
SEVENTH ST SEVENTH ST
CHARLES ST PINE ST HUGHSON AVE WHITE PINE WY
SANTA FE AVE
INSTALL NEW PEDESTRIAN RAMP, SEE GENERAL NOTES (58 EA)
1 VICINITY MAP & DETAILS REMOVE & REPLACE EX CURB RETURN (TYP) VICINITY MAP NORTH LEGEND 1. PEDESTRIAN RAMPS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMO, REMOVAL, AND DISPOSAL OF THE EXISTING CURB RETURN OR CURB RAMP. CONCRETE REMOVAL SHALL EXTEND FROM BEGINNING OF CURVE TO END OF CURVE, AND A FIVE FOOT (5') WIDTH OF PAVEMENT ALONG THE CURVE OF THE LIP OF GUTTER. THE CONTRACTOR SHALL THEN INSTALL EITHER A CASE "A" OR CASE "B" RAMP BASED ON EXISTING CONDITIONS AND THE ALIGNMENT OF THE BACK OF WALK, ALONG WITH A SINGLE LIFT OF 3" HMA. CONCRETE RAMPS AND PAVEMENT SHALL MEET CURRENT ADA STANDARDS. SEE DETAIL A AND DETAIL B, THIS SHEET. 2. ANY DAMAGE TO EXISTING UTILITIES WILL BE SOLE RESPONSIBILITY OF THE CONTRACTOR. 3. ANY DAMAGE TO EXISTING SIDEWALK, CURB OR GUTTER WILL BE SOLE RESPONSIBILITY OF THE CONTRACTOR, WITH REPLACEMENT TO BE DETERMINED BY THE ENGINEER. 4. ALL SAWCUTS SHALL BE MADE AT EXISTING EXPANSION OR WEAKENED PLANE JOINTS WITH APPROVAL PENDING ENGINEER OR CITY REPRESENTATIVE. GENERAL NOTES ELM ST LOCUST ST
FIRST ST WILLOW ST
FOURTH ST
FIFTH ST
FOX GLEN DR
KIT FOX DR
HUNTMASTER DR HEATHROW WAY THICKET CT VIXEN CT LOCUST ST NOT TO SCALE CASE "A" PEDESTRIAN RAMP A NOT TO SCALE CASE "B" PEDESTRIAN RAMPB
596