Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) Ramon Carlos | Labor Compliance Officer
Mr. Ramon Carlos, Jr. has been a labor compliance officer since 2003 with the public sector as well as private sector. He takes on highly challenging positions and projects, and with his energy, initiative, and ability to implement and administer programs, delivers successful assignments that have built his reputation in our industry as one of the best labor compliance officers in the Inland Empire.
RELEVANT PROJECTS CURRICULUM VITAE
City of Corona, I-15/Cajalco Road Interchange Project, Corona, CA Labor Compliance Officer. Mr. Carlos served as the labor compliance officer for this $50M project. The project reconstructed the interchange located on Interstate 15 at Cajalco Road in the City of Corona. The improvements will increase the capacity of the overcrossing and ramps in order to reduce congestion and accommodate projected development and growth in the area. As the labor compliance officer, Ramon is responsible for reviewing contractor’s certified payroll records, performing worker interviews, DBE reports and EEO records.
I-10/Jefferson Street Interchange Project, Indio, CA
Labor Compliance Officer. Mr. Carlos served as the Labor Compliance Officer for this project that consisted of widening the existing structure for both west and east bound traffic. The project added a 5-foot bike lane and an 8-foot shoulder to improve pedestrian safety and tie in with the existing east and west bound approaches by widening the existing structures. The project also included the installation of a water main on Foothill. Throughout the construction duration, one-way traffic was maintained on Foothill Boulevard, continuous access to the businesses and residents was also maintained.
Foothill Boulevard Bridge Widening, San Dimas, California Labor Compliance Officer. Mr. Carlos served as the Labor Compliance Officer for this project that consisted of widening the existing structure for both west and east bound traffic. The project added a 5-foot bike lane and an 8 foot shoulder to improve pedestrian safety and tie in with the existing east and west bound approaches by widening the existing structures.
Los Alamos Bridge, I-15, Murrieta, California
Labor Compliance Officer. He reviewed the Prime and subcontractor certified payrolls, on a monthly basis, to confirm compliance with specified prevailing wage requirements. He also provided written reports with any findings on certified payroll reviews and interviews to construction manager on a monthly basis.
Project Cost: $30 million │ Performance Period: 12/2006-12/2010 Riverside Water Treatment Plant (WQCP expansion project), Riverside, California Labor Compliance Officer. He reviewed the Prime and subcontractor certified payrolls, on a monthly basis, to confirm compliance with City of Riverside specified prevailing wage requirements. He conducted on-site/mail interviews with prime and subcontractor employees to confirm compliance with the City of Riverside specified prevailing wage requirements. He conducted source document reviews on contractors who performed work on project. He also provided written reports with any findings on certified payroll reviews and interviews to construction manager on a monthly basis.
Project Costs: Varies │ Performance Period: Varies
Total Years of Experience:
19 Total Years with firm:
10 Education:
High School Diploma
D-1. Proposed Personnel
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) Garreth M. Saiki, PE, GE | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 1
EDUCATION
MBA, 1998, University of California Davis
M.S., Geotechnical Engineering, 1989,
University of California Berkeley
B.S., Civil Engineering, 1987, University of
California Berkeley
REGISTRATIONS/
CERTIFICATIONS
PE 49665 (California)
GE 2509 (California)
Nuclear Gauge Operator Certification
PROFESSIONAL
AFFILIATIONS
American Society of Civil Engineers
Garreth Saiki, PE, GE
Materials Project Manager
As a Principal Engineer for Ninyo & Moore, Mr. Saiki coordinates and conducts geotechnical evaluations for residential, commercial, and public facilities, including highways, railroads, airports, pipelines, public and private buildings, and bridges; performs slope stability analyses, flexible and rigid pavement design, and underground pipeline design; prepares and reviews geotechnical reports; and provides geotechnical design parameters and recommendations for shallow and deep foundations, retaining structures, in-situ ground remediation and earthwork; reviews laboratory results, project plans and specifications; provides supervision and technical support to stafflevel engineers and geologists; performs project administration and management; and provides forensic evaluation of distressed pavement, residential and commercial structures.
EXPERIENCE
San Pedro Plaza Park Phase III, San Pedro, California: Served as Project Manager during earthwork testing and observation services for the San Pedro Plaza Park – Phase III project located at 7000 South Beacon Street in the San Pedro area of Los Angeles, California. The project consisted of minor slope grading in order to assist in supporting a new walkway ramp and stairway along the existing descending slope located on the east side of the park site. Ninyo & Moore’s field services consisted of earthwork testing and observation during the slope improvement earthwork operations. Services also included laboratory testing, as well as final compaction report preparation and submittal.
South Los Angeles Wetland Park, Los Angeles, California: Served as Principal Engineer during the rough and fine grading and various trench excavation and structural backfill recompaction operations for the South LA Wetland Park/LA BOE project located in Los Angeles, California. The project consisted of construction of a new wetland area that will include ponds, swales, and weir structures, as well as a pump station, pedestrian bridges, observation decks, decomposed granite walkways, and new underground stormdrain pipelines. Materials testing services included laboratory proctor density, sieve analysis, and sand equivalent testing of the excavated materials used as recompacted fill.
Marsh Park Project, Los Angeles, California: Served as Project Manager for the geotechnical and materials testing and deputy inspection services during construction of the Marsh Park project that is located in Los Angeles, California. The project consisted of construction of a new park site that will include a new restroom building, picnic shelter, storage structure, trash enclosure, and perimeter site walls, seat walls, and a new asphalt concrete parking lot, as well as new bio-swale, utility pipeline, concrete pavement, decomposed granite and landscaping construction.
Peck Park Canyon Enhancement, San Pedro, California: Served as Project Manager retained to provide geotechnical consulting services for the Peck Park Canyon Enhancement Project in the San Pedro area of Los Angeles, California. The project involved the design and construction of Best Management Practices (BMP’s) to improve water quality, provide erosion protection, and reduce flooding potential along Peck Park Canyon and Dunn Canyon. Pedestrian bridges and pedestrian path improvements were also included in the project. Mr. Saiki performed a geotechnical evaluation for design purposes and oversaw geotechnical observation and testing services during the construction phase.
D-2. Proposed Personnel
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) D-2. Proposed Personnel
Vance L. Hunter, Senior Field Technician | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 1
REGISTRATIONS/
CERTIFICATIONS
Caltrans TL-0111 Certification
ACI Concrete Field Technician
Certification
OSHA 40-hour Hazardous Waste
Operations and Emergency Response
Certification
Nuclear Gauge Operator Certification
Vance L. Hunter
Materials Senior Field Technician
As a Senior Field Technician for Ninyo & Moore, Mr. Hunter performs field testing of concrete and asphalt concrete, provides inspection of asphalt and concrete batch plants, provides geotechnical laboratory testing, quality control for all laboratory procedures, including fulfilling requirements for ASTM, AASHTO, CALTRANS, ACI, and UBC Standards, and provides geotechnical observation and testing services for earthwork projects.
EXPERIENCE
Caltrans District 12/Sampling and Testing Services, #12A1437 and #12A1589, Orange County, California: Senior field Technician responsible for providing materials testing services to support the development and construction of state transportation projects in District 12. Field services included sampling and testing of concrete, asphalt concrete subgrade, and aggregate base. Laboratory testing services included California Impact Test, R-value, AC extraction, AC maximum density, durability, and flexural strength testing. Testing was performed in accordance with CTM standards.
Caltrans District 12 I-405 Improvement Project, Orange County, California:
Ninyo & Moore was retained to provide materials sampling and testing services for the I-405 Improvement Project between SR-73 and I-605. The project consists of 16 miles of improvements, including adding one regular lane in each direction between Euclid Street and I-605, as well as improvements to existing on-ramps, off-ramps, and bridges. The project also included the creation of the I-405 Express Lanes which incorporate the existing carpool lanes and a new lane in each direction between SR-73 and I-605. Ninyo & Moore’s services included sampling and testing for soils, concrete, and asphalt materials per Caltrans and AASHTO Specifications. Specifically, soils and aggregate testing included CT 125 (all materials), CT 201, CT 202, CT 205, CT 216, CT 217, CT 226, CT 227, CT 231 and CT 229. Concrete testing included CT 504, CT 518, CT 523, CT 533, CT 539, CT 540, CT 543, CT 556, and CT 557.
Specific laboratory Tests included CT 301, CT 304, CT 308, CT 309, and AASHTO T 312 and T 324. Our work also included working out of Caltrans’ laboratory located in Huntington Beach.
Orange County Transportation Authority/I-5 Gateway Project (I-5 between SR91 Freeway and Los Angeles County Line), Los Angeles, California: Inspector/ Technician retained to provide sampling and testing of structural concrete, asphalt concrete (AC), asphalt treated permeable base (ATPB), embankment fill, lean concrete base (LCB), cement treated base (CTB), aggregate base (AB) and polymer concrete overlay. Services included batch plant inspection during production of asphalt concrete and structural concrete. A mobile lab was set up on-site to help speed up the turn-around time on some of the lab tests.
I-5 and La Paz Road Widening, Laguna Hills, California: Served as Senior Field Technician retained to provide sampling and testing of structural concrete, trench backfill, retaining wall backfill, subgrade, aggregate base, and asphalt concrete. Our services also included batch plant inspection during production of asphalt concrete and structural concrete. The project schedule required work at night and on weekends.
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) E. References
Garfield Avenue & Imperial Highway Street Improvements, Firestone Boulevard & Otis Street Improvements, and
Imperial Highway Center Median Project
Southstar Engineering is providing construction management, inspection, and labor compliance services for this two project contract. Services provided include:
contract administration, construction observation/inspection, utility coordination, surveying, labor compliance, traffic engineering support, geotechnical and material testing services, and project close-out services.
Imperial Highway between Los Angeles River and west City limits: (a) Installation of a raised center medians with landscape and hardscape, (b) landscape uplighting, (c) pavement rehabilitation, (d) reconstruction of deficient sidewalk, curb and gutter, drive approaches, and (e) ADA compliance.
Garfield Avenue betweenJefferson Avenue to South City limit: (a) Installation of landscape, (b) pavement rehabilitation, (c) reconstruction of deficient sidewalk, curb and gutter, drive ap-proaches, and decorative paver crosswalks, (c) ADA compliance, and (d) Holly-dale Library Improvements.
Firestone Boulevard between San Miguel Avenue to Otis Street: (a) Installation of the landscape, (b) construction of a drop-off/pick-up lane and traffic signal modification at Firestone Boulevard/Otis Street, (c) pavement rehabilitation, (d) reconstruction of deficient sidewalk, curb and gutter, drive approaches, and (e) ADA compliance.
LOCATION
South Gate, Los Angeles County, CA
OWNER
City of South Gate
Jose Loera, Interim Deputy City
Engineer/City Traffic Engineer 8650
California Ave,
South Gate, CA 90280
Office: 323.563.9578
E-Mail:
CONSTRUCTION COST
$6 Million
DATES OF SERVICE
09/2020 - 03/2022
STAFF
Yvette Kirrin, PE - Project Manager
Amr Abuelhassan, PE, MS, QSD
Sergio Topete
References
Southstar is proud of our references, as they generate repeat business, and help us grow. The three (3) references that we’ve chosen to showcase in our proposal include the Cities of South Gate, Bellflower and Santa Fe Springs. Not only do we work regularly within these Cities but the work performed within these jurisdictions are consistent with the scope of work to be performed in this contract. Owing that these Cities are all within the Gateway Cities subregion: we know that you know them and can also have candid discussions about our abilities to deliver work professioanally, on-time and under budget
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) On-Call Construction Management and Inspection Services The subcontractor Ferreira make wires connection on control panel on Bellflower Bl. with SR-91 west bound
City of Bellflower
DAILY INSPECTION PHOTO REPORT
Permit. No: 715-NMC-0542 Sheet: 01
Contract No: Specification No. 14/15-09 Report No: 149
Title: Bellflower Boulevard Widening – Artesia Boulevard to SR-91 westbound Ramps (Specifications No. 14/15-09)
Date: 08/16/2019
Contractor: Sequel Contractors, Inc.
10142 Shoemaker Ave. Santa Fe Springs, CA 90670 M T W TH F SA SU The subcontractor Ferreira make and pour concrete on sidewalk around pull box on Bellflower Bl. with Artesia Bl.
The subcontractor Ferreira make wires connection on control panel on Bellflower Bl. with SR-91 west bound
The subcontractor Ferreira make excavation and leveling in ADA ramp in northwest corner of Bellflower Bl. with SR-91 west bound The subcontractor Ferreira pour concrete in ADA ramp in northwest corner of Bellflower Bl. with SR-91 west bound Start 7:00
End 5:00
Construction Inspector Reg. Hrs. 8.0
Sergio Topete Title OT Hrs. 0.0-
ke and pour concrete on sidewalk
Bl. with Artesia Bl.
The subcontractor Ferreira make wires connection on control panel on Bellflower Bl. with SR-91 west bound
ke excavation and leveling in ADA
ellflower Bl. with SR-91 west bound
The subcontractor Ferreira pour concrete in ADA ramp in northwest corner of Bellflower Bl. with SR-91 west bound Start 7:00
End 5:00
Construction Inspector Reg. Hrs. 8.0
ete Title
OT Hrs. 0.0-
The Southstar team provided construction management and inspection services for various improvements projects throughout the City of Bellflower.
Mr. Topete was the preferred inspector for these projects due to his successful track record in the local area. After completion of these improvement projects, the City provided Southstar with immense appreciation for Mr. Topete’s work.
Inspection services provided include the observation of the installment of concrete on sidewalk around the pull box on Bellflower Bl. and Artesia Bl., the subcontractor making wire connections on the control panel, excavation and leveling of ADA ramps, and the installment of concrete into ADA ramps. Below is a list of Task Orders for Inspection Services:
• Bellflower Boulevard Widening Project. Artesia Boulevard to SR-91 WB Ramp. Specification No. 14/15-09 (with Caltrans Coordination) • Eucalyptus Avenue Street Improvements from Somerset Boulevard to Flora Vista Street (Specification 13/14-04)
DAILY IN
Permit. No: 715-NMC-0542
Contract No: Specification No. 14/15-09
Title: Bellflower Boulevard Widening – Artesia Boulevar Ramps (Specifications No. 14/15-09)
Contractor: Sequel Contractors, Inc.
10142 Shoemaker Ave. Santa Fe Springs, CA 9067
The subcontractor Ferreira make and pour concrete on sidewalk around pull box on Bellflower Bl. with Artesia Bl.
T
p
The subcontractor Ferreira make excavation and leveling in ADA ramp in northwest corner of Bellflower Bl. with SR-91 west bound T
n
Constr
Sergio Topete
LOCATION
Bellflower, CA
OWNER
City of Bellflower
Mr. Jerry Stock - City Engineer &
91/605/405 TAC Vice-Chair
16600 Civic Center Dr. Bellflower,
CA 90706
Cell: 714.448.5835
E-Mail:
CONSTRUCTION COST
Various
DATES OF SERVICE
02/2017 - Ongoing
STAFF
Yvette Kirrin, PE - Project Manager
Amr Abuelhassaan, PE, MS, QSD
Sergio Topete
E. References
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) On-Call Construction Inspection and
Engineering Professional Services
Southstar Engineering has been providing project management, construction management and public outreach services on various Capital Improvement Projects for the City. Improvements included: reconstruction of sidewalks, stamped concrete, curb and gutters; upgrades or additions of ADA ramps; pavement re-habilitation; storm drain reconstruction or rehabilitation; and traffic signal up-grades, landscape and irrigation improvements, bioswale construction, and parking lot resurfacing.
Below is a list of completed task orders:
• Santa Fe Road Improvement Project
• Ann Street Improvements Project
• Painter Road Improvement Project
• Rivera Road Street Improvements Project
• Santa Fe Springs Slurry Seal Program
• Scoareboard Replacement Project
• City Hall Parking Lot Improvements Project
• Whittier Water Main Connection
• Barkley and Parkmead Street Improvement Project
• Florence Avenue Water Main Relocation Phase 1 and 2 Project • Florence Avenue Widening Project
• I-5 Florence Avenue Interchange Project
• Greenleaf Avenue Street Improvement Project
• Valley View Grade Separation Project, E-76 Submittal
• Street Light Inventory Project, City-Wide
LOCATION
Santa Fe Springs, Los Angeles County,
CA
OWNER
City of Santa Fe Springs
Noe Negrete, Public Works Director
11710 Telegraph Rd,
Santa Fe Springs, CA 90670
Office: 562.409.7611
Cell: 562.455.5680
E-Mail:
CONSTRUCTION COST
Various
DATES OF SERVICE
01/2016 - Ongoing
STAFF
Yvette Kirrin, PE - Project Manager
Amr Abuelhassan, PE, MS, QSD
E. References
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) F. Answers to Request for Information (RFI) No. 1
1 | Page
March 9, 2022
CITY OF HUNTINGTON PARK
Answers to Request for Information (RFI) No. 1
Request for Proposal & Notice Inviting Bid
CIP 2017-03 ATP Cycle 3
The following questions were posed by individuals interested in the Request for Proposal (RFP) and Notice Inviting Bid (NIB) for the CIP 2017-03 ATP Cycle 3. Answers to the questions are highlighted in yellow.
1. Since this project is federally funded, what is the minimum DBE commitment required?
Project not federally funded. No DBE requirement.
Answers to RFI No. 1 shall hereby be made a part of the RFP/NIB and supersede, replace, and/or amend the provisions included in the original RFP and contract specifications in the NIB.
Please sign below and attach this “ACKNOWLEDGMENT OF RECEIPT”, Responses to RFI’s with the Proposal submittal documents. Failure to submit the signed Responses to RFI’s Acknowledgement will render the contractor’s bid as non-responsive.
Thank you for your cooperation.
ACKNOWLEDGMENT OF RECEIPT: Responses to RFI’s
_____________________________________________ ________________ Company Name Date
_____________________________________________
Print Name
_____________________________________________
Signature
Southstar Engineering & Consulting, Inc. 03/09/2022
Yvette Kirrin - President
Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) F. Answers to Request for Information (RFI) No. 1
2 | Page
End of Request for Information No. 1
By order of the City of Huntington Park, Public Works Department By: _______________________________________
Cesar Roldan, Director of Public Works
Date: _3/8/2022 _____________________________________
Cost Proposal For City of Huntington Park
CIP 2017-03 Active Transportation Program Cycle III Project No. ATPL-5150(015) Cost Proposal - Southstar Engineering and Consulting, Inc.
March 22, 2022
City of Huntington Park
Mr. Cesar Roldan, Director of Public Works
6550 Miles Avenue
Huntington Park, CA 90255
RE: CIP 2017-03 ATP Cycle III Project No. ATPL-5150(015) – CM/CI Services Dear Mr. Roldan,
Southstar Engineering & Consulting, Inc. (Southstar) greatly appreciates the opportunity to submit the below cost proposal. The Southstar team is prepared to work under the City’s Public Works Staff to support the CIP 2017-03 ATP Cycle III Project No. ATPL-5150(015) Project.
Southstar Engineering is the team to deliver the quality, responsiveness, innovation and value that the City of Huntington Park expects, and we want to successfully deliver your project on schedule and under budget.
The Southstar team looks forward to continue our working relationship with the City of Huntington Park. Again, we appreciate the opportunity to submit our qualifications to you.
Sincerely,
Yvette Kirrin, PE
President & Principal-in-Charge
Southstar Engineering & Consulting, Inc.
Name Role Weeks Total Project Hours Hourly Rate Total Cost Yvette Kirrin Principal‐In‐Charge** 20 0 $ 259.00 $ ‐ Sergio Topete PM/Construction Inspector*** 20 800 $ 122.00 $ 97,600.00 Ramon Carlos Labor Compliance 20 60 $ 110.00 $ 6,600.00 Total $ 104,200.00 Ninyo & Moore
*Assumption: 20 weeks for Project Field Services $3,398 ** Courtesy will be provided at no cost. Laboratory Testing $756 ***Assuming 40 hours per week, inspection level of effort Project Coordination $830 Total $4,984
Total Project $109,184
Engineer’s Estimate: $862,169
Proposed Fee % of Engineers Cost
12.66%
Southstar Engineering and Consulting, Inc. Cost Proposal ‐ City of Huntington Park CIP 2017‐03 ATP Cycle 3 Project No. ATPL‐5150(015)* Materials Testing