Indio Electric Finance Authority Item: Purchase by the Indio Electric Fi... Page 126 of 503
FIELD SERVICE POLICY
All field service work is performed in accordancewith the following clarifications, unlessotherwise mutually agreedupon:
Customer Responsibilities
The customer or others are expectedto provide the following, unlessotherwise noted in our quotation:
1. Free, clear, and unlimited accessto substation site and areasaround the equipment foundation.
2. Switch, lock out, and ground any equipment necessary to establish a safe work area.
3. Disconnect and reconnect all external bushing/bus terminations, protection controls, CTs, and relay wiring, asrequired.
4. Disassembly and reassemblyof any deluge and/or iso-phasebus systems, as required, for free and clear access.
5. Disposal of excess/scrap oil, solid wastes, crates, and/ or packaging material generated during the execution of work.
6. Temporary power source (120/240 VAC @ 30 amps) and a ladder to accessthe top of the equipment, as needed.
7. One person on- site during the execution of any work, for safety reasons, that also has the competency to provide clarifications on any energized or de-energized equipment within the substation.
Additional Charges
The following out-of-scopesituations may occur during work execution, which additional chargeswill apply:
1. Initial customer site- specific safety training in excess of four ( 4) hours.
2. Spareparts that are NOT within fifty ( 50) feet of the transformer.
3. Safety equipment requirements beyond personal protective equipment ( PPE) (safety glasses, hard hat, safety shoes, harness, & lanyard) or customer required site- access training for Delta Star personnel or subcontractors.
4. When temperaturesare below 10°C (50°F), it will be necessaryto elevate the transformers (active part & insulation) temperature prior to starting the final vacuum / oil filling process. This additional work will be based on T& M rates.
5. If/ when secondary oil containment may be required for compliance with any EPA or local site SPCC programs.
6. Customer requirements that exceedthose listed in our DS-100 (DS Installation and Maintenance Instruction Manual)
7. Exception is taken to all items that are not outlined in the Scope of Work section. For any additional work performed, thesetaskswill be consideredout-of-scopeand will be invoiced in accordancewith our FS Rate ScheduleFS-1000A.
8. Purchaseraccepts & assumesall responsibility for the resolution of any labor disputes regarding union representation, pricing, or work jurisdictions, including full liability for all costsincurred resulting from any such disputes.
9. Purchasershall provide a recent PCB report / certification of eachunit prior to the start of any scheduledwork. a. If PCB concentration is higher than 49 PPM, DSI will be unable to complete the work. b. If PCB concentration is 1-49 PPM, additional decontamination charges will apply. The proper disposal of the PCB oil shall be the responsibility of the purchaseror others.
Delays
Pricing is basedupon Delta Star crews working 7-days a week, and 8-12 hours per day uninterrupted. Any standby time or delays that are beyond Delta Star’s control, including those resulting from restricted or limited site access, will be consid ered out-of-scopework, and shall be billed in accordancewith Delta Star’s Field Service Rate ScheduleFS-1000A.
Cancellation
In the event of project cancellation, customer may be liable for the amounts set forth and outlined below ascompensation for reasonablecostsincurred, unlessotherwise approved by an authorized Delta Star Field Service representative. 0 -7 days prior to scheduled on- site date = 25% of order value or 8- 14 days prior to scheduled on- site date = 10% of order value.
Indio Electric Finance Authority Item: Purchase by the Indio Electric Fi... Page 127 of 503
FIELD SERVICE SCOPE OF WORK
A general description of services is provided below.
Field Service Supervision
Field Service technician will complete arrival check, provide installation guidance, complete internal connections, verify the installation meets our warranty requirements, and verify the transformer is ready for energization as time permits.
o Arrival Check: Prior to installation, a Delta Star Field Service technician will check arrival conditions ( check pressure, core insulation resistance, and insulation moisture content if applicable), review the transformer for damages/ leaks and complete a loose part inventory inspection.
Includes all- inclusive travel, per diem, and labor costs for a minimum of three ( 3) days on- site with two days ( roundtrip) travel to the customer identified substation site location.
A report is provided to the client with our checklist and photos to validate the inspection(s) performed. A customer representativemust acknowledge the report.
Unless waived by Delta Star, Field service is required to validate warranty coverage. Field service must be completed within four months (or 120 days) of delivery date. If unit is placed in storage, full assemblyof unit is required within four months of delivery per Delta Star Installation and Maintenance Instruction Manual ( DS-100).
Field Service Mobile Technical Assistance
Delta Star Field Service will provide one field service mobile substation specialist at the requestof our customerduring the field installation or acceptance of the subject equipment. The field service specialist will technically assist customer on the proper set-up and deployment of the equipment and provide standard/basic instruction to qualified electrical personnel during the installation and acceptanceof the equipment.
Includes all-inclusive travel, per diem, and labor costsfor a minimum of three (3) dayson-site with two days (roundtrip) travel to the customer identified substation site location. Additional days can be purchased for $ 3,150 per day per specialist.
Field Service Installation Services
Transformer Installation according to Delta Star Installation and Maintenance Instruction Manual ( DS- 100) unless otherwise approved.
Assembly of all ship loose parts.
Addition of make-up oil for radiators by meansof a filter cart.
Standardtesting includes: Core & Winding Insulation Resistance; Overall Power Factor & Capacitance; Bushing Power Factor (C1 & C2), if no test tap, perform Hot Collar; Surge Arrestor Power Factor; Single PhaseExcitation ( All HV DETC Taps to N, Rated HV DETC Tap to LTC Taps 1L, 1R, & 16R); Transformer Turns Ratio ( All HV DETC Taps to N, Rated HV DETC Tap to LTC Taps 16L thru 16R); verify operation of all devices reinstalled in the field; verify operation of LTC, if equipped; andOil Testing to include Moisture, DGA, IFT, Acid, Color/ Visual, D1816-2mm, Power Factor 25/ 100, SG & PCB.
Vacuum oil fill as listed in DS- 100 ( if applicable)
Clarifications
Additional days as required or requestedwill be charged at $2,000 per day, per technician basedon an 8 hour day, unless otherwise noted above. Overtime, weekend and holiday pay incurred will be additional charges.
No provisions are included for Union labor requirements; an updated field service quotation will be provided upon request.
Indio Electric Finance Authority Item: Purchase by the Indio Electric Fi... Page 128 of 503 Revised 11/1/2019
ISO 9001: 2015 CERTIFICATE
Indio Electric Finance Authority Item: Purchase by the Indio Electric Fi... Page 129 of 503
Indio Electric Finance Authority Item: Purchase by the Indio Electric Fi... Page 130 of 503 City of Indio
City Council
March 20, 2024
STAFF REPORT
To: City Council
From: Bryan H. Montgomery, City Manager
Prepared by: Bryan H. Montgomery, City Manager
Subject: Authorization of Contract Change Order No. 1: In the amount of $338,941.00 for the Indio Badlands Trailhead Parking Lot Project with Three Peaks Corp.
New work entails the removal of current conditions, including chain link fence, new of implementation the signs, existing header, plastic and construction features such as paved roads, parking spaces, curbs, gutters, tubular fence, walkways, etc. The allocation covers the costs associated with the added Indio Badlands Trailhead Parking Lot Project, City Project No. PK2405.
RECOMMENDATION:
Approve a construction Contract Change Order No. 1 in the amount of $338,941.00 for the Indio Badlands Trailhead Parking Lot Project with Three Peaks Corp.
SUMMARY:
This staff report seeks authorization for Contract Change Order No. 1 with Three Peaks Corp., for $338,941.00, to construct the Indio Badlands Trailhead Parking Lot Project (City Project No.
PK2405). Initially, the contract with Three Peaks Corp. entailed constructing parking lots in our Downtown area. If approved, this contract will now include the Indio Hills Badlands Hiking Trail Parking Project, enhancing accessibility and user experience. The choice of Three Peaks Corp., originally the lowest bidder for the Downtown projects by over $50,000, allows the City to leverage competitive pricing and streamline project execution.
BACKGROUND INFORMATION:
A budget of $450,000 was approved for the Indio Badlands Trailhead Parking Lot in this current fiscal year budget, The project represents a strategic initiative aimed at bolstering the City's outdoor recreational infrastructure. The inclusion of this project in the fiscal year's planning and its execution within the original budget, facilitated by Three Peaks Corp.'s competitive pricing, exemplifies the City's dedication to efficiently enhancing public amenities. Consolidating the project under a single contractor not only streamlines the timeline but also ensures completion in time for the peak hiking season, from fall through spring, without the need for additional financial resources.
FINANCIAL SUMMARY:
Current FY Financial
Impact:
338,941 In current year budget: Yes
AGENDA ITEM #8.7
Authorization of Contract Change Order No. 1: In the amount of $338,941.... Page 131 of 503 Current FY General
Fund Impact:
0 Budget adjustment: No
Next FY Financial
Impact:
0 Strategic Objective:
Source of funds: CIP Fund-Org-Object
Reference:
300-554002
ALTERNATIVES:
Not to authorize the change order request.
ATTACHMENTS:
Attachment 1 - Bid Sheets Badlands Trailhead Parking Lot - Three Peaks Corp.
Attachment 2 - Badlands Trailhead Parking Lot-Precise Grading Planset
APPROVAL(S):
Ruby D. Walla, Director of Finance Approved - 12 Mar 2024 Bryan H. Montgomery, City Manager Approved - 12 Mar 2024
Authorization of Contract Change Order No. 1: In the amount of $338,941.... Page 132 of 503 M
Mobilization/ Demobilization
(not exceed 5% of total estimate
cost)
LS 1 $10,000.00 $10,000.00
DC Dust Control LS 1 $4,400.00 $4,400.00
S SWPP LS 1 $2,000.00 $2,000.00
TTC Temporary Traffic Control LS 1 $2,500.00 $2,500.00
RG Rough Grading LS 1 $41,180.00 $41,180.00
DN 1 Remove existing 6" edgeband LF 540 $10.00 $5,400.00 DN 2 Remoe existing plastic header LF 575 $3.00 $1,725.00 DN 3 Remove portions of existing 6' high
chain link fence LF 320 $18.00 $5,760.00
DN 4 Remove and reinstall existing 24'
wide chain link drive gate EA 1 $3,720.00 $3,720.00
DN 5 Remove existing 20' wide chain link
gate EA 1 $1,310.00 $1,310.00
DN 6 Remove existing 4' wide chain link
gate EA 1 $200.00 $200.00
DN 7 Remove Existing Signs EA 4 $100.00 $400.00
CN 1 Install 3" AC pavement over 4"
class II AB SF 18005 $4.20 $75,621.00
CN 2 Construct 6" curb and gutter per
detail 120 LF 195 $63.00 $12,285.00
CN 3 Construct 6" median curb per detail
123 LF 1455 $44.00 $64,020.00
CN 4 Construct 3' ribbon gutter per
detail 139 LF 510 $35.00 $17,850.00
CN 5 Construct Caltrans accessible curb
ramp EA 1 $5,100.00 $5,100.00
CN 6 Install parking stall striping per
detail on sheet 2 LF 700 $3.10 $2,170.00
CN 7 Install handicap accessible parking
stals per detail on sheet 2 EA 2 $1,340.00 $2,680.00
CN 8 Construct 4" thick meandering path
per detail 134 SF 960 $11.00 $10,560.00
CN 9 Construct 6' wide cobble lined
swale per detail on sheet 2 SF 110 $21.00 $2,310.00
CN 10 Construct 24'Wx6'H tubular fence
vehicle gate per detail on sheet 2 EA 1 $7,745.00 $7,745.00 CN 11 Construct 6' H tubular fence per
detail on sheet 2 LF 320 $109.00 $34,880.00
CN 12 Construct walkway LF 775 $26.00 $20,150.00
CN 13 Construct 0" curb EA 2 $150.00 $300.00
CN 14 Construct earthen swale per detail
on sheet 2 LF 425 $11.00 $4,675.00
$338,941.00
BADLANDS TRAIL HEAD BASE AMOUNT:
EXTENDED
AMOUNT
UNITED
PRICES
ESTIMATED
QUANTITYUNITDESCRIPTIONITEM
NO.
Authorization of Contract Change Order No. 1: In the amount of $338,941.... Page 133 of 503 A/V
BO
BO
M
XX
1 COVER SHEET
{UTILITIES
WATER INDIO WATER AUTHORITY (760) 391-4046
SEWER VALLEY SANITARY DISTRICT (760) 347-2356
IRRIGATION COACHELLA VALLEY WATER DISTRICT (760) 398-2651 ELECTRIC IMPERIAL IRRIGATION DISTRICT (760) 399-9420 GAS THE GAS COMPANY (760) 335-7772
TELEPHONE VERIZON (760) 864-1715
CABLE T.V. TIME WARNER CABLE (760) 674-5472
USA UNDERGROUND SERVICE ALERT (800) 227-2600}
N.T.S.
%%UVICINITY MAP
%%UINDEX MAP
SHEET 3 (DEMO)
{NOTE TO CONTRACTOR: SITE CONDITIONS}
{CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITION DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT APPLIES CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS.
THE CONTRACTOR ALSO AGREES TO DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE MSA CONSULTING, INC., HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR MSA CONSULTING, INC.} {NOTE TO CONTRACTOR: EXISTING UTILITIES}
{THE LOCATIONS OF UNDERGROUND UTILITIES SHOWN ON THE PLANS WERE OBTAINED FROM A REVIEW OF AVAILABLE RECORD DATA. WHILE DUE CARE WAS TAKEN IN PREPARATION OF THIS INFORMATION, MSA CONSULTING, INC. CANNOT AND DOES NOT GUARANTEE THE ACCURACY NOR THE COMPLETENESS OF THE INFORMATION. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK.
THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH RESULT FROM HIS FAILURE TO LOCATE EXACTLY AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL POTHOLE PROPOSED CROSSINGS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION AND SHALL VERIFY THEIR HORIZONTAL AND VERTICAL LOCATIONS.
IN THE EVENT, DURING CONSTRUCTION, THAT UNKNOWN UTILITIES OR UNKNOWN STRUCTURES ARE FOUND AT UNEXPECTED ELEVATIONS OR LOCATIONS, MSA CONSULTING, INC. IS TO BE NOTIFIED OF SUCH CONDITION AT ONCE. MSA CONSULTING, INC. WILL MAKE REQUIRED DESIGN CHANGES AND THE CONTRACTOR AGREES TO COMPLETE ALL WORK, INCLUDING REPAIRS REQUIRED, IN AN EXPEDITIOUS MANNER. THE CONTRACTOR FURTHER AGREES TO PURSUE DILIGENTLY THE COMPLETION OF SAID WORK.
ANY DISCREPANCY BETWEEN THE PLANS AND FIELD SHALL BE BROUGHT TO THE ATTENTION OF MSA CONSULTING, INC. THE CONTRACTOR SHALL NOTIFY MSA CONSULTING, INC. PRIOR TO POTHOLING. IF NECESSARY, MSA CONSULTING, INC. SHALL REVISE THE PLANS. THE CONTRACTOR SHALL BEGIN CONSTRUCTION AFTER REVISIONS ARE APPROVED.} {NOTE: RAW EARTHWORK ESTIMATE NO FACTORS
THE ABOVE LISTED EARTHWORK QUANTITIES ARE RAW FIGURES WITH NO SHRINKAGE OR SUBSIDENCE FACTORS INCLUDED. THE EARTHWORK QUANTITIES SHOWN ON THIS
PLAN ARE APPROXIMATE ESTIMATES SHOWN FOR AGENCY FEE PURPOSES ONLY, AND ARE BASE UPON THE PLAN ELEVATIONS SHOWN AND ON THE GROUND ELEVATIONS WHICH EXISTED AT THE TIME OF THE TOPOGRAPHIC SURVEY. THE LOCATION AND ELEVATION OF THE EXISTING GROUND CONTOURS WERE OBTAINED FROM A FIELD SURVEY AND ARE APPROXIMATE ONLY. NO REPRESENTATION IS MADE OR WARRANTY IMPLIED THAT THESE QUANTITIES ARE PRECISE OR THAT THE EARTHWORK WILL BALANCE.} {NUISANCE WATER DISCLAIMER NOTE:
EXCESSIVE OVER-IRRIGATION OF LANDSCAPING, IF IT PERSISTS, CAN POTENTIALLY RESULT IN DAMAGE TO OR FAILURE OF DRYWELLS, RETENTION BASINS, HARDSCAPE OR PAVEMENT. THE DESIGN SHOWN HEREIN IS INTENDED TO COMPLY WITH AGENCY REQUIREMENTS, INDUSTRY STANDARDS AND LOCAL CONDITIONS BASED UPON INFORMATION AVAILABLE TO THE DESIGN ENGINEER, ASSUMING RESPONSIBLE MAINTENANCE ON THE PART OF THE PROPERTY OWNER OR ASSOCIATION. IT IS RECOMMENDED THAT THE DEVELOPER INCORPORATE INTO FUTURE CC&R'S ENFORCEABLE RESTRICTIONS AGAINST OVER-WATERING BY FUTURE RESIDENTS.} {SOURCE OF TOPOGRAPHY:
SURVEY PERFORMED BY:
}MSA CONSULTING INC.
34200 BOB HOPE DRIVE
RANCHO MIRAGE, CALIFORNIA 92270
PHONE (760) 320-9811
DATE: APRIL 11, 2018
{ }
{EARTHWORK ESTIMATE
(FOR PERMIT PURPOSES ONLY)
RAW CUT 510 CY
RAW FILL 365 CY}
DETAILS
INDEX OF SHEETS
4 2
1 SHEET
GRADING PLANS
COVER SHEET
DESCRIPTION
{SITE ADDRESS}
{NORTHEAST CORNER OF AVENUE 42 AND GOLF CENTER
PARKWAY IN THE CITY OF INDIO}
{ABBREVIATIONS
(E) EAST
(N) NORTH
(S) SOUTH
(W) WEST
(NE) NORTHEAST
(NW) NORTHWEST
(SE) SOUTHEAST
(SW) SOUTHWEST
AC ASPHALT CONCRETE
BC BEGINNING OF CURVE
BCR BEGIN CURB RETURN
BOC BACK OF CURB
BS BOTTOM OF STEPS
BSL BUILDIG SETBACK
C# CURVE
C/L CENTERLINE
C&G CURB AND GUTTER
C.B. CATCH BASIN
C.Y. CUBIC YARDS
D DEPTH
DB DRAIN BOX
DWG. DRAWING
DWY DRIVEWAY
EA. EACH
EC END OF CURVE
ECR END CURB RETURN
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
}{EVC END OF VERTICAL CURVE
EX. EXISTING
FF FINISHED FLOOR
FG FINISHED GRADE
FL FLOWLINE
FS FINISHED SURFACE
GB GRADE BREAK
GF GARAGE FLOOR
HC HANDICAP
HP HIGH POINT
HZ HORIZONTAL}
{INV INVERT
LINE L#
L.F. LINEAL FEET
LP LOW POINT
MAX. MAXIMUM
MH MANHOLE
MIN. MINIMUM
MOC MID-POINT OF CURVE
MVC MIP-POINT OF VERTICAL CURVE
NG NATURAL GROUND
NO. NUMBER
N.T.S. NOT TO SCALE
O/H OVERHEAD
P/L PROPERTY LINE
P.C.C. PORTLAND CONCRETE CEMENT
PCC POINT OF COMPOUND CURVE
PE PAD ELEVATION
PIG POINT OF INTERSECTION/GUTTER FL
POC POINT ON CURVE
}{PRC POINT OF REVERSE CURVE
PP POWER POLE
PROP. PROPOSED
PT. POINT
PUE PUBLIC UTILITY EASEMENT
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
R/W RIGHT OF WAY
RAD. RADIUS
RED. REDUCER
SD STORM DRAIN
S.F. SQUARE FEET
STA. STATION
STD. STANDARD
S/W SIDEWALK
SWR SEWER
TB TOP OF BERM
TC TOP OF CURB
TF TOP OF FOOTING
TOG TOP OF GRATE
TP TOP OF PAVEMENT
TRW TOP OF RETAINING WALL
TW TOP OF WALL
TYP. TYPICAL
VC VERTICAL CURVE
VERT VERTICAL
W WIDTH
{NOTE TO CONTRACTOR: DRAINAGE INTEGRITY}
{THIS GRADING PLAN PROVIDES FOR ON-SITE DRAINAGE IN ACCORDANCE WITH THE FLOWLINES SHOWN. IT IS THE DEVELOPER'S RESPONSIBILITY TO ENSURE THAT THE SWALES ARE
CONSTRUCTED BY THE GRADING CONTRACTOR OR LANDSCAPE CONTRACTOR IN ACCORDANCE WITH THE APPROVED GRADING PLAN AND THAT THE INTEGRITY OF THE SWALES IS MAINTAINED. THIS PRECLUDES THE CONSTRUCTION OF BLOCK WALLS, FENCES, OR OTHER STRUCTURES ACROSS FLOWLINES WITHOUT PROVISIONS FOR APPROPRIATE OPENINGS.
MSA CONSULTING, INC. ASSUMES NO RESPONSIBILITY FOR ALTERATIONS IN THE DRAINAGE SYSTEM CAUSED BY ANY SUCH STRUCTURES OR OTHER GRADING MODIFICATIONS MADE BY THE DEVELOPER, HIS SUBCONTRACTORS, OR THE PROPERTY OWNER.} {CITY OF INDIO'S STANDARD GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT ENGINEERING STANDARDS FOR THE CITY OF INDIO, UNLESS OTHERWISE NOTED ON THE APPROVED PROJECT PLANS, OR AS DIRECTED BY THE CITY ENGINEER.
2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR DEVELOPER/OWNER FOR A DEVELOPMENT PROJECT) TO OBTAIN FROM THE CITY OF INDIO, AND OTHER GOVERNING AGENCIES, ALL NECESSARY PERMITS PRIOR TO THE BEGINNING OF CONSTRUCTION.
3. THE CONTRACTOR (OR DEVELOPER/OWNER FOR A DEVELOPMENT PROJECT) IS RESPONSIBLE FOR SATISFACTORY COMPLIANCE WITH ALL CURRENT ENVIRONMENTAL REGULATIONS.
4. THE CONTRACTOR MUST NOTIFY THE ENGINEERING DIVISION OF THE CITY OF INDIO'S PUBLIC WORKS DEPARTMENT (760.391.4019) AT LEAST 48 HOURS IN ADVANCE OF BEGINNING ANY NEW PHASE OF WORK. ANY IMPROVEMENT(S) INSTALLED WITHOUT INSPECTION(S) BY THE CITY WILL BE SUBJECT TO REMOVAL.
5. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN ON THE PLANS IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING UNDERGROUND SERVICE ALERT AT LEAST 48 HOURS PRIOR TO BEGINNING ANY EXCAVATION AND AS OTHERWISE REQUIRED BY LAW.
6. CONTACT PHONE NUMBERS FOR SOME OF THE LOCAL UTILITIES IN INDIO ARE: