PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council held on this 18th day of July 2023, the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________
LINDA EVANS, Mayor
City of La Quinta, California
ATTEST:
_________________________
MONIKA RADEVA, City Clerk
City of La Quinta, California
APPROVED AS TO FORM:
___________________________
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
468 CLICK HERE to Return to Agenda
City of La Quinta
Master Fee Schedule
- Effective October 1, 2023 -
RESOLUTION NO. 2023-XXX
EXHIBIT A
ADOPTED: JULY 18, 2023
469 CLICK HERE to Return to Agenda
Table of Contents
Contents Page
1 Building Fees - Mechanical, Plumbing, and Electrical 1 2 Building Fees - Miscellaneous Items 4
3 Building Fees - New Construction 7
4 Building Fees - Other Fees 8
5 Planning Fees 10
6 Public Works Fees 13
7 Fire Fees 19
8 NPDES Ongoing Inspection Fees 21
9 Short-Term Vacation Rental Permit Fees 22
10 Medical Cannabis Delivery Application Fees 23
11 False Alarm Response Fees 24
12 Vehicle Impound Cost Recovery Fees 25
13 Code Enforcement Hourly Rate for Services 26
14 Pool Drain Permit Fees 27
15 Home Occupation Permit Fees 28
16 Film/Photography Permit Fees 29
17 Bingo Permit Fees 30
18 Administrative Fees 31
19 Appeal Fees 32
20 Facility Use Fees 33
21 SilverRock Event Site Facility Rental Fees 35
22 Parking Lot and Open Space Rental Fees 36
470 CLICK HERE to Return to Agenda
Fees
Fee Description Permit Plan Check Total Notes
Permit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical) $115.94 $115.94 Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance $45.77 $30.51 $76.28
3 Installation or relocation of each suspended heater, recessed wall heater, or floor-mounted unit heater
$30.51 $15.26 $45.77
4 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by the UMC
$15.26 $6.10 $21.36
5 Installation or relocation of each boiler, condenser, compressor, or each absorption system
$45.77 $30.51 $76.28
6 Air-handling unit, including attached ducts $45.77 $15.26 $61.02 7 Evaporative cooler, other than portable-type $15.26 $15.26 $30.51 8 Ventilation fan connected to a single-duct $15.26 $6.10 $21.36 9 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood
$15.26 $6.10 $21.36
10 Each appliance or piece of equipment not classified in other appliance categories, or for which no other fee is listed
$45.77 $45.77 $91.53
Mechanical Change-Out
11 Condenser Only $45.77 $30.51 $76.28
12 Furnace Only $45.77 $30.51 $76.28
13 Other Equipment $45.77 $45.77 $91.53
14 Packaged Unit $45.77 $30.51 $76.28
15 Repair / Alteration $15.26 $6.10 $21.36
16 Split-System $45.77 $91.53 $137.30
Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection)
$15.26 $15.26 $30.51
18 Sewer Connection / Septic Abandonment $30.51 $21.36 $51.87 19 Rainwater systems, per drain (inside building) $15.26 $15.26 $30.51 20 Water heater and/or vent $15.26 $9.15 $24.41
21 Industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps $45.77 $15.26 $61.02
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical 471 1 CLICK HERE to Return to Agenda
Fees
Fee Description Permit Plan Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical 22 Installation, alteration, or repair of water piping and/or water-treating equipment, drainage or vent piping, each fixture
$15.26 $15.26 $30.51
23 Backflow protective device other than atmospheric-type vacuum breakers $15.26 $6.10 $21.36 24 Gas piping system - 1 to 4 outlets $15.26 $30.51 $45.77 25 Gas piping system - 5 or more outlets $45.77 $30.51 $76.28 26 Solar (Thermal) $30.51 $30.51 $61.02
Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
$183.07 $60.41 $243.48
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
$15.56 $6.41 $21.97
29 Non-Residential - First 2,000 SF $137.30 $106.18 $243.48 30 Non-Residential - Each Additional 2,000 SF $45.77 $12.20 $57.97 Solar (Photovoltaic)
31 Solar (PV) Less than 10kW $30.51 $30.51 $61.02 [a]
32 Solar (PV) Greater than 10kW $45.77 $45.77 $91.53 [a] 33 Each Additional String (<20) $3.05 $0.76 $3.81 [a]
Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters - first 20 $30.51 $30.51 $61.02
35 Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters - each additional $3.05 $0.76 $3.81
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 $30.51 $30.51 $61.02 37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l $3.05 $0.76 $3.81 38 Pole or platform-mounted light replacement, repair or alteration - first 10 $30.51 $30.51 $61.02 39 Pole or platform-mounted light replacement, repair or alteration - each additional
$3.05 $0.76 $3.81
472 2 CLICK HERE to Return to Agenda
Fees
Fee Description Permit Plan Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including wallmounted electric ovens; counter-mounted cooking tops; electric ranges; self-contained room, console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding one horsepower (HP) in rating, each
$15.26 $15.26 $30.51
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-residential appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt ampere (KVA) in rating, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each
$30.51 $30.51 $61.02
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, each
$30.51 $30.51 $61.02
Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each $45.77 $61.02 $106.79 Services
44 Services, each $30.51 $15.26 $45.77
Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or pedestalmounted receptacle outlets and appurtenances, each$30.51 $21.36 $51.87 Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is identified
$30.51 $30.51 $61.02
[a] Plan review fees will be waived if approved real time code review software is used. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application. 473 3 CLICK HERE to Return to Agenda
Fees
Fee Description Permit Plan Check Total Notes
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF $153.78 $216.02 $369.80 [a] b) Residential Addition - Each Additional 500 SF $78.72 $21.97 $100.69 [a] c) Structural Review bill hourly (1 hour min.) [a]
2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF $176.84 $248.42 $425.27 [a] b) Non-Residential Addition - Each Additional 500 SF $90.53 $25.26 $115.79 [a] c) Structural Review bill hourly (1 hour min.) [a]
Antenna
3 Dish > 2 Ft $45.77 $168.42 $214.19
4 Cellular/Mobile Phone $183.07 $259.96 $443.03
5 Equipment Shelter $45.77 $122.66 $168.42
Appeal
6 Appeal bill hourly (1 hour min.)
Awning/Canopy (Supported by Building)
7 Awning/Canopy $18.31 $259.96 $278.26
Balcony Addition
8 Balcony Addition $183.07 $214.19 $397.26
Block Wall
9 Block Wall - First 100 LF $61.02 $76.28 $137.30
10 Block Wall - Each Addt'l 50 LF $18.31 $18.31
11 Retaining / Combination Wall - Each 50 LF $18.31 $18.31 Carport
12 Carport - First $91.53 $122.66 $214.19
13 Carport - Each Additional $91.53 $48.82 $140.35
Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection $91.53 $228.84 $320.37 Demolition
15 Demolition $31.12 $109.84 $140.96
16 Demolition - Interior $45.77 $122.66 $168.42
17 Demolition - Exterior $45.77 $137.30 $183.07
Fence
18 Fence - First 100 LF $60.41 $76.89 $137.30
19 Fence - Each Additional 50 LF $18.31 $18.31
Fireplace
20 Fireplace $183.07 $274.60 $457.67
Flag/Lighting Pole
21 Flag/Lighting Pole - First $45.77 $122.66 $168.42
22 Flag/Lighting Pole - Each Additional $18.31 $5.49 $23.80 City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
474 4 CLICK HERE to Return to Agenda
Fees
Fee Description Permit Plan Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Grading
23 Residential Precise Grading (Tract Homes) - Per Home $168.42 $168.42 [b] 24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF $45.77 $45.77 $91.53 25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF $45.77 $228.84 $274.60 Partition
26 Partition $91.53 $168.42 $259.96
Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First) $122.66 $120.83 $243.48 28 Standard, Enclosed, Pre-Engineered (First) $122.66 $166.59 $289.25 29 Special Design (First) $168.42 $212.36 $380.78
30 Each Additional $61.02 $45.77 $106.79
Pool / Spa
31 Swimming Pool / Spa $228.84 $124.49 $353.32
32 Detached Spa / Water Feature $228.84 $228.84
33 Gunite Alteration $228.84 $124.49 $353.32
34 Equipment Change-out Alone $30.51 $115.94 $146.46
Remodel
35 Non-Structural Review - Up to 100 SF $62.24 $170.25 $232.50 [a] 36 Non-Structural Review - Each Additional 500 SF $27.46 $21.97 $49.43 [a] 37 Structural Review bill hourly (1 hour min.) [a]
Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans $259.96 $259.96 39 Replacement of Inspection Record Card $45.77 $45.77
Re-Roof
40 Re-Roof - Up to 2,000 SF $62.24 $124.49 $186.73
41 Re-Roof - Each Additional 1,000 SF $14.65 $14.65
Sign
42 Monument Sign - First $91.53 $168.42 $259.96
43 Monument Sign - Each Additional $31.12 $31.12
44 Wall/Awning Sign - First $31.12 $109.84 $140.96
45 Wall/Awning Sign - Each Additional $31.12 $31.12 $62.24 Storage Racks
46 Storage Racks - First 100 LF $31.12 $120.83 $151.95
47 Storage Racks - Each Additional 100 LF $14.65 $14.65 Stucco Application
48 Stucco Application - First 500 SF $31.12 $93.37 $124.49 49 Stucco Application - Each Additional 500 SF $9.15 $9.15 Temporary Trailer
50 Temporary Trailer $183.07 $183.07 $366.14
Utility Release
51 Electrical Utility Release $91.53 $91.53
475 5 CLICK HERE to Return to Agenda
Fees
Fee Description Permit Plan Check Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 $76.89 $75.06 $151.95
53 Retrofit/Repair - Each Additional 5 $12.81 $12.81
54 New/Alteration - First $122.05 $139.13 $261.18
55 New/Alteration - Each Additional $12.81 $14.65 $27.46 Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items $183.07 $183.07 [c]
57 b) New Construction varies [c] [d]
58 Plan Check / Permit Extension Processing $122.66 $122.66 59 Plan Check / Revisions (per hour) $183.07 $183.07
60 Change of Contractor, Architect, Owner Processing $122.66 $122.66 61 Request/Research for Alternative Methods/Product Review bill hourly (1 hour min.) 62 Temporary Certificate of Occupancy $549.21 $549.21 [e] 63 Disabled Access Compliance Inspection $183.07 $183.07 64 Partial Inspection Fee $91.53 $91.53 [f]
65 Re-inspection Fee $91.53 $91.53 [f]
66 Excess Plan Check Fee bill hourly [g]
67 Investigation Fee for Work Commenced Without a Permit equal to permit fee 68 Refunds
a) Fees Erroneously Paid or Collected by the City [h]
b) Fees Prior to Work Being Commenced [i]
c) 180 Days After Payment of Fees [j]
[d] Initial deposit varies depending on project details. [e] Per issuance, each extension will be assessed fee at each occurrence. [c] Non-Refundable Initial Deposit. For projects that request permit issuance the intitial deposit amount will be credited against total fees.
100% refund
up to 80% refund
no refund
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application, including the cost of structural engineering review services.
[a] Fee is intended to capture structural and non-structural reviews. Mechanical, Electrical, and Plumbing review and inspection fees are collected separately.
[b] Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based on the number of sheets submitted for plan review. See Public Works fee schedule. [f] The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees. [g] The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for the provision of all subsequent re-check services.
[h] The Building Official may authorize refunding of any fee paid, or portion thereof, which was erroneously paid or collected by the city.
[i] No fees are refundable once the work covered by them is commenced. [j] Whether work has commenced or not, no fees are refundable more than 180 days after their payment. 476 6 CLICK HERE to Return to Agenda
Fee Description Fee - Permit *
New Construction
1 $1 - $10,000 $183.07 for the first
$5,000, plus
$54.92 for each additional $1,000 or fraction
thereof, to and including $10,000
2 $10,001 - $25,000 $457.67 for the first
$10,000, plus
$12.20 for each additional $1,000 or fraction
thereof, to and including $25,000
3 $25,001 - $200,000 $640.74 for the first
$25,000, plus
$9.41 for each additional $1,000 or fraction
thereof, to and including $200,000
4 $200,000 and Up $2,288.36 for the first
$200,000, plus
$4.71 for each additional $1,000 or fraction
thereof
Fee Description Fee - Plan Check *
(Project Valuation)
5 $1 - $10,000 $183.07 for the first
$5,000, plus
$91.53 for each additional $1,000 or fraction
thereof, to and including $10,000
6 $10,001 - $25,000 $640.74 for the first
$10,000, plus
$21.36 for each additional $1,000 or fraction
thereof, to and including $25,000
7 $25,001 - $200,000 $961.11 for the first
$25,000, plus
$3.40 for each additional $1,000 or fraction
thereof, to and including $200,000
8 $200,000 and Up $1,556.08 for the first
$200,000, plus
$2.72 for each additional $1,000 or fraction
thereof
Fee Description
Fee - Plan Check for
Multiple Structures - Each Additional **
(Project Valuation)
9 All Valuations $61.02
Fee Description Fee
10 Building Department Staff $183 per hour
11 City Attorney/Other Legal Rvw 100% of actual costs
12 Outside Service Providers 100% of actual costs
** Fee applies when multiple identical units are submitted for review and permitted at the same time.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - New Construction
* The new construction fees identified in this fee schedule include the cost of structural engineering review services currently conducted by outside service providers. Additional fees will be collected for the provision of all plan review services beyond second review.
* The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees. * The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for the provision of all subsequent re-check services.
477 7 CLICK HERE to Return to Agenda
Fee Description Fee Notes
Strong Motion Instrumentation (SMI)
Fee Calculation
1 Residential $0.50 or valuation x .00013
2 Commercial $0.50 or valuation x .00028
Art In Public Places (AIPP) Fee Calculation [a]
3 Residential $20.00 or 1/4 of 1% of value exceeding $200,000 4 Commercial $20.00 or 1/2 of 1% of value
Building Standards Administration Special Revolving
Fund (SB 1473) Fee Calculation
[b]
5 Valuation:
a) $1 - $25,000 $1
b) $25,001 - $50,000 $2
c) $50,001 - $75,000 $3
d) $75,001 - $100,000 $4
e) Every $25,000 or fraction thereof above $100,000 Add $1 Technology Enhancement Fee
6 Technology Enhancement Fee (per permit) $8
Digital Archiving and Records Management Fee
7 Digital Archiving and Records Management Fee
a) OTC Permit/Application $12
b) All Others $23
[a] Source: La Quinta Municipal Code 2.65.060.
[b] Source: California Health and Safety Code Section 18931.6 City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Other Fees
478 8 CLICK HERE to Return to Agenda
Building Valuation Data
Occupancy and Type
Cost per
Sq Ft Avg Occupancy and Type
Cost per
Sq Ft Avg Occupancy and Type
Cost per
Sq Ft Avg Occupancy and Type
Cost per
Sq Ft Avg
1 APARTMENT HOUSES: 7 DWELLINGS: 13 JAILS: Type III-B $26.70 Type I-A or I-B * $72.50 Type V - Masonry $60.80 Type I-A or I-B $130.00 Type V-A $27.10 (Good) $89.00 (Good) $78.00 Type III-A $116.90 20 RESTAURANTS:
Type V - Masonry Type V - Wood Frame $54.30 Type V-A $88.00 Type III-A $78.80 (or Type III) $58.80 (Good) $77.90 14 LIBRARIES: Type III-B $76.20 (Good) $71.80 Basements - Type I-A or I-B $95.40 Type V-A $72.00 Type V - Wood Frame $51.60 Semi-Finished $16.20 Type II-A $68.90 Type V-B $69.10 (Good) $65.90 (Good) $18.50 Type II-B $65.50 21 SCHOOLS:
Type I - Basement Garage $30.80 Unfinished $12.20 Type III-A $72.70 Type I-A or I-B $90.90 2 AUDITORIUMS: (Good) $14.30 Type III-B $69.20 Type II-A $61.20 Type I-A or I-B $85.80 8 FIRE STATIONS: Type V-A $68.20 Type III-A $65.70 Type II-A $61.50 Type I-A or I-B $92.80 Type V-B $65.20 Type III-B $62.30 Type II-B $58.80 Type II-A $60.50 15 MEDICAL OFFICES: Type V-A $61.20 Type III-A $64.60 Type II-B $57.50 Type I-A or I-B * $97.40 Type V-B $58.40 Type III-B $61.70 Type III-A $66.70 Type II-A $74.60 22 SERVICE STATIONS:
Type V-A $61.40 Type III-B $63.80 Type II-B $71.20 Type II-B $54.40 Type V-B $58.50 Type V-A $62.20 Type III-A $78.60 Type III-A $56.60 3 BANKS: Type V-B $59.20 Type III-B $75.70 Type V-A $48.10 Type I-A or I-B * $121.40 9 HOMES FOR THE ELDERLY: Type V-A $72.90 Canopies $22.60 Type II-A $88.20 Type I-A or I-B $85.00 Type V-B $70.00 23 STORES:
Type II-B $85.60 Type II-A $68.40 16 OFFICES**: Type I-A or I-B * $67.40 Type III-A $97.70 Type II-B $65.20 Type I-A or I-B * $87.20 Type II-A $40.60 Type III-B $94.30 Type III-A $71.20 Type II-A $57.80 Type II-B $39.80 Type V-A $87.90 Type III-B $68.20 Type II-B $55.20 Type III-A $49.60 Type V-B $85.00 Type V-A $68.60 Type III-A $62.40 Type III-B $46.80 4 BOWLING ALLEYS: Type V-B $65.70 Type III-B $59.60 Type V-A $41.60 Type II-A $41.10 10 HOSPITALS: Type V-A $57.80 Type V-B $38.40 Type II-B $38.30 Type I-A or I-B * $133.50 Type V-B $54.90 24 THEATERS:
Type III-A $44.90 Type III-A $109.40 17 PRIVATE GARAGES: Type I-A or I-B $89.80 Type III-B $41.90 Type V-A $103.50 Wood Frame $19.60 Type III-A $64.60 Type V-A $30.50 11 HOTELS AND MOTELS: Masonry $22.00 Type III-B $61.60 5 CHURCHES: Type I-A or I-B * $82.20 Open Carports $13.30 Type V-A $60.40 Type I-A or I-B $81.20 Type III-A $71.00 18 18. PUBLIC BUILDINGS: Type V-B $57.40 Type II-A $60.20 Type III-B $67.60 Type I-A or I-B * $101.40 25 WAREHOUSES***:
Type II-B $57.20 Type V-A $62.90 Type II-A $80.90 Type I-A or I-B $40.40 Type III-A $65.50 Type V-B $59.90 Type II-B $77.60 Type II-A or V-A $23.60 Type III-B $62.50 12 INDUSTRIAL PLANTS: Type III-A $83.80 Type II-B or V-B $22.20 Type V-A $60.80 Type I-A or I-B $46.60 Type III-B $81.10 Type III-A $27.10 Type V-B $58.00 Type II-A $32.10 Type V-A $76.70 Type III-B $25.90 6 CONVALESCENT
HOSPITALS:
Type II-B $29.40 Type V-B $73.80
Type I-A or I-B * $113.80 Type III-A $35.30 19 PUBLIC GARAGES: EQUIPMENT Type II-A $77.20 Type III-B $32.80 Type I-A or I-B * $39.60 AIR CONDITIONING:
Type III-A $80.10 Tilt-up $24.10 Type I or II Open
Parking *
$30.00 Commercial $3.50
Type V-B $75.10 Type V-A $33.00 Type II-B $23.20 Residential $2.90 Type V-B $30.20 Type III-A $29.90 SPRINKLER SYSTEMS: $1.70 * Add 0.5 percent to total cost for each story over three. ** Deduct 20 percent for shell-only buildings.
*** Deduct 11 percent for mini-warehouses.
Note: Building valuation data transcribed from Building Standards, July-August 1994 and adapted to 2007 CBC Types of Construction. Revised 3/5/2009. 479 9 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
Temporary Use
1 Temporary Use Permit - Minor (Standard) $455
2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
bill per hour, with $455 base fee
3 Temporary Use Permit - Major (Standard) $2,380
4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
bill per hour, with $2,380 base fee
Minor Use
5 Minor Use Permit bill per hour, with $455 base fee
6 Minor Use Permit - Amendment bill per hour, with $455 base fee Conditional Use
7 Conditional Use Permit bill per hour, with $7,292 base fee 8 Conditional Use Permit - Planned Unit Dev. bill per hour, with $7,292 base fee 9 Conditional Use Permit - Amendment bill per hour, with $3,555 base fee 10 Conditional Use Permit - Time Extension $1,922
Expedited Review Fee
11 Expedited Review Fee 1.5x
standard
fee
[a]
Site Development
12 Development Agreement bill per hour, with $3,783 base fee [b] 13 Site Development Permit - Planning Commission bill per hour, with $10,130 base fee 14 Site Development Permit - Administrative bill per hour, with $8,665 base fee 15 Site Development Permit - Amendment bill per hour, with $5,309 base fee 16 Site Development Permit - Time Extension $1,922
17 Modification by Applicant bill per hour, with $455 base fee 18 Minor Adjustment bill per hour, with $455 base fee
19 Underground Waiver bill per hour, with $2,746 base fee 20 Variance bill per hour, with $2,746 base fee
Landscape Plan
21 Final Landscape Plan $2,288
Housing
22 Senate Bill (SB) 330 Application Review $1,465
Conceptual Design Review
23 Conceptual Design Review $2,563 [c]
Signs
24 A-Frame Sign Permit $0
25 Sign Permit $404
26 Sign Program bill per hour, with $3,234 base fee
27 Sign Program Amendment $1,098
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
480 10 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Zoning
28 Zone Change bill per hour, with $10,679 base fee
29 Director's Determination $461
30 Certificate of Compliance $574
31 Zoning Letter - Basic Property Information $299
32 Zoning Letter - Basic Property Information with
Additional Research Required
$1,556
33 Zoning Text Amendment bill per hour, with $10,740 base fee Street Name Change
34 Street Name Change $2,288
Historical Structures
35 Landmark Designation/Cert of Appropriateness $1,501
Environmental Review
36 Recordation of Exemption $183
37 Initial Study (ND/MND) bill per hour, with $3,661 base fee 38 Environmental Impact Report bill per hour, with $10,618 base fee General/Specific Plan
39 Specific Plan bill per hour, with $12,327 base fee
40 Specific Plan - Amendment bill per hour, with $5,431 base fee 41 General Plan Amendment bill per hour, with $11,899 base fee Map
42 Tentative Parcel Map bill per hour, with $5,736 base fee 43 Tentative Parcel Map - Waiver $1,556
44 Tentative Parcel Map - Amendment bill per hour, with $3,417 base fee 45 Tentative Parcel Map - Revision bill per hour, with $3,417 base fee 46 Tentative Parcel Map - Time Extension $1,098
47 Tentative Tract Map bill per hour, with $9,520 base fee 48 Tentative Tract Map - Amendment bill per hour, with $4,516 base fee 49 Tentative Tract Map - Revision bill per hour, with $4,516 base fee 50 Tentative Tract Map - Time Extension (CC or PC) $2,105 51 Tentative Tract Map - Time Extension (Admin) $1,190
52 Tentative Condominium Map bill per hour, with $9,520 base fee 53 Amended Final Parcel Map (Entitlement Support) bill per hour, with $4,577 base fee 54 Amended Final Tract Map (Entitlement Support) bill per hour, with $7,323 base fee Zoning Clearance - Planning Plan Check
55 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential $92
b) New Construction - Single Family Residential $183
c) New Construction - 2-4 Residential Units $275
d) New Construction - 5+ Residential Units $732
e) New Construction - Non-Residential $366
f) Alterations/Additions - Non-Residential $183
481 11 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Technology Enhancement Fee
56 Technology Enhancement Fee $8
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application $12
b) All Others $23
Appeal
58 Appeal $1,500
Fee Description Proposed Fee * Notes
59 Planning Department Staff $183 per hour
60 City Attorney or Other Legal Review pass-through of 100% of actual costs 61 Outside Service Providers pass-through of 100% of actual costs [b] In addition to the fee shown for Development Agreement, the City shall collect a $5,000 initial deposit to offset City Attorney costs.
[c] 50% of fee may be credited toward entitlement application submittal. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. [a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff availability and workload.
Note: If multiple applications are received concurrently from the same applicant for different projects that require similar application review and are generally similar except for location, one project location shall pay 100% of application review fee(s), the fee(s) for each project application at other locations shall be 50% of the original fee(s). 482 12 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
Land Subdivision
1 Parcel Map:
a) Final Parcel Map
i) Initial Sheet $2,838 per sheet
ii) Each Additional Sheet $824 per sheet
b) Final Parcel Map - Amendment
i) Initial Sheet $2,838 per sheet
ii) Each Additional Sheet $824 per sheet
c) Substantial Conformance Review
i) Initial Sheet $3,341 per sheet
ii) Each Additional Sheet $1,465 per sheet
2 Tract Map:
a) Final Tract Map
i) Initial Sheet $3,021 per sheet
ii) Each Additional Sheet $915 per sheet
b) Final Tract Map - Amendment
i) Initial Sheet $3,021 per sheet
ii) Each Additional Sheet $915 per sheet
c) Substantial Conformance Review
i) Initial Sheet $3,341 per sheet
ii) Each Additional Sheet $1,465 per sheet
3 Reversion to Acreage:
a) Initial Sheet $3,112 per sheet
b) Each Additional Sheet $824 per sheet
4 Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment $2,197 per request
b) Parcel Merger $2,197 per request
5 Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
$2,243 per request
b) Vacation of Street/Public ROW $2,746 per request
6 Land Survey
a) Record of Survey $595 per request
b) Certificate of Correction $778 per request
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
483 13 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet $1,785 per sheet
ii) Each Additional Sheet $915 per sheet
iii) Revisions - Initial Sheet $1,305 per sheet
iv) Revisions - Each Additional Sheet $915 per sheet
b) Precise Grading - Commercial
i) Initial Sheet $2,243 per sheet
ii) Each Additional Sheet $1,281 per sheet
iii) Revisions - Initial Sheet $1,671 per sheet
iv) Revisions - Each Additional Sheet $1,281 per sheet
c) Precise Grading - Tract Homes
i) Initial Sheet $1,373 per sheet
ii) Each Additional Sheet $229 per sheet
iii) Revisions - Initial Sheet $710 per sheet
iv) Revisions - Each Additional Sheet $229 per sheet
d) Precise Grading - Custom Home [a]
e) PM10
i) Initial Sheet $665 per sheet
ii) Each Additional Sheet $0 per sheet
iii) Revisions - Initial Sheet $512 per sheet
iv) Revisions - Each Additional Sheet $0 per sheet
f) Street Improvements
i) Initial Sheet $2,060 per sheet
ii) Each Additional Sheet $1,098 per sheet
iii) Revisions - Initial Sheet $1,488 per sheet
iv) Revisions - Each Additional Sheet $1,098 per sheet
g) Storm Drain
i) Initial Sheet $1,876 per sheet
ii) Each Additional Sheet $1,098 per sheet
iii) Revisions - Initial Sheet $1,488 per sheet
iv) Revisions - Each Additional Sheet $1,098 per sheet
h) Signing and Striping
i) Initial Sheet $1,693 per sheet
ii) Each Additional Sheet $915 per sheet
iii) Revisions - Initial Sheet $1,305 per sheet
iv) Revisions - Each Additional Sheet $915 per sheet
484 14 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
i) Traffic Signal
i) Initial Sheet $1,510 per sheet
ii) Each Additional Sheet $732 per sheet
iii) Revisions - Initial Sheet $1,122 per sheet
iv) Revisions - Each Additional Sheet $732 per sheet
j) Sidewalk
i) Initial Sheet $1,327 per sheet
ii) Each Additional Sheet $549 per sheet
iii) Revisions - Initial Sheet $939 per sheet
iv) Revisions - Each Additional Sheet $549 per sheet
k) Traffic Control Plan $92 per sheet
l) Record Drawings Review
i) Initial Sheet $961 per sheet
ii) Each Additional Sheet $183 per sheet
m) Hydrology Report $1,968 per report
i) Revisions $915 per report
n) Traffic Study $1,510 per study
o) WQMP Report
i) With Prior Entitlement $1,785 per report
ii) Without Prior Entitlement $2,151 per report
iii) Revisions $915 per report
p) SWPPP/Erosion Control Plan $2,060 per plan
i) Revisions $732 per plan
q) Sewer and Water
i) Initial Sheet $1,465 per sheet
ii) Each Additional Sheet $549 per sheet
iii) Revisions - Initial Sheet $915 per sheet
iv) Revisions - Each Additional Sheet $549 per sheet
8 Plan Review (>3 Reviews) $183 per hour
9 Expedited Plan Review Fee 1.5x standard fee [b]
10 Permit Inspection
a) Rough Grading
i) First 3 Acres $3,661
ii) Each Additional Acre $915
iii) Last One Acre $458
b) Precise Grading
i) First 3 Acres $3,661
ii) Each Additional Acre $915
iii) Last One Acre $458
485 15 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
c) Precise Grading - Tract Homes $168 [c]
d) Precise Grading - Custom Homes $92 [c]
e) PM10
i) < 10 Acres $4,394 [d]
ii) 10 - 50 Acres $6,590 [d]
iii) 51 - 200 Acres $8,787 [d]
iv) > 200 Acres $13,181 [d]
f) Street Improvements - Off-Site
i) First 1,000 LF $5,858
ii) Each Additional 1,000 LF $5,126
iii) Last 1,000 LF $3,295
g) Street Improvements - On-Site
i) First 1,000 LF $4,028
ii) Each Additional 1,000 LF $3,295
iii) Last 1,000 LF $2,197
h) Storm Drain
i) First 1,000 LF $3,478
ii) Each Additional 1,000 LF $2,746
iii) Last 1,000 LF $1,831
i) Signing and Striping
i) First 1,000 LF $1,831
ii) Each Additional 1,000 LF $1,098
iii) Last 1,000 LF $549
j) Traffic Signal $4,943
k) NPDES $2,197
l) Bond Reduction Request $2,471
m) Final Inspection/Acceptance $3,295
n) Traffic Control Only
i) One Day $370
ii) Two - Five Days $739
iii) Each Additional Day (Up to 10 Days) $370
iv) 11+ Days $4,302
o) Cut/Bore $824
p) Driveway
i) Residential $199
ii) Commercial $1,190
486 16 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
q) Excavation / Trenching
i) First 100 LF $824
ii) Each Additional 100 LF $366
iii) Last 100 LF $183
r) Sidewalk
i) First 100 Lineal Feet $917
ii) Each Additional 100 Lineal Feet $500
iii) Last 100 Lineal Feet $167
s) Sewer and/or Water $1,465
t) Night Work $458
11 Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA) $2,197
b) SIA - Time Extension $1,281 per request
c) Assignment & Assumptions Agreement $2,380 per request d) Flood Plain Research/FEMA App $1,098 per request
e) Bid Protest Review $824 per request
12 Reactivation of Permit
a) Reactivation of an Expired Permit / Permit Extension 10% of original permit fee
one year extension
13 Technology Enhancement Fee
Technology Enhancement Fee $8
Digital Archiving and Records Management Fee
14 Digital Archiving and Records Management Fee
a) OTC Permit/Application $12
b) All Others $23
15 Transportation Permits
a) Annual $90
b) Single Event $16
16 Refunds
a) Refunds for Plan Checks
i) If plan check has not begun 90% refund [e]
ii) If 1st plan check has begun 30% refund [e]
iii) If 2nd plan check has begun 10% refund [e]
iv) Past 2nd plan check no refund [e]
b) Refunds for Permits - Permit issued and no work has
commenced
Up to 50% of original
permit fee
[f]
487 17 CLICK HERE to Return to Agenda
Fee Description Fee * Notes
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description Fee * Notes
17 Public Works Personnel $183 per hour
18 City Attorney or Other Legal Review 100% pass-through of actual cost
19 Outside Service Providers 100% pass-through of actual cost
[e] Upon request of the applicant, the director may authorize refunding a percentage of fees paid with the following schedule. If any portion of the plan check fee has been paid out by the city to another agency or consultant for services rendered in connection with the plan check, no refund of that portion of the fee shall be made. [f] Upon request of the applicant, the director may authorize refunding of not more than 50% of fees paid when no work has been done under an issued permit. In no case shall the refund exceed the cost of services provided to date of cancellation of permit issuance.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any discrete costs incurred from the use of outside service providers required to process the specific application. Exception for contract traffic engineering and plan review consulting costs, which are included in the fees listed above.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. [a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot size of the custom home. See Building fee schedule, Grading section. [b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See Building fee schedule, Grading section.
[d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the number of months permitted.
488 18 CLICK HERE to Return to Agenda
Fee *
Fee Description Plan Review
Permit /
Inspection Total Notes
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums) $549 $366 $915 2 New Commercial / Industrial $549 $458 $1,007
3 Residential Addition / Remodel $91 $91 $182
4 Commercial Tenant Improvement $274 $183 $458
5 Commercial / Industrial Addition or Remodel $274 $274 $549 6 New Single Family Dwelling (Access/Water) $91 $91 $182 [a] 7 Automatic Suppression System $366 $366 $731
8 Kitchen Hood Suppression System $274 $183 $458
9 Fire Suppression System - Existing Modifications $183 $183 $366 10 Fire Alarm Systems $641 $549 $1,190
11 Fire Alarm-Monitoring and Tenant Improvements $274 $183 $458 12 Fire Sprinkler Systems - Single Family Detached
a) 1-50 Sprinkler Heads $274 $183 $458 [a]
b) 51-100 Sprinkler Heads $274 $274 $549 [a]
c) Over 100 Sprinkler Heads $274 $366 $640 [a]
13 Fire Sprinkler Systems - Tract Master Plan $274 $0 $274 14 Fire Sprinkler Systems - Tract Production Home $0 $183 $183 15 Fire Sprinkler Systems - Multi-Family 3 or more units $366 $274 $640 [b] 16 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF $458 $274 $732 17 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF $549 $321 $870 18 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF $641 $458 $1,099 19 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF $732 $641 $1,374 20 Fire Sprinkler Systems - Tenant Improvement $183 $366 $549 21 Fire Pumps $366 $366 $731
22 Fire Standpipe Systems $274 $366 $640
23 Smoke Controls Systems $641 $549 $1,190
24 Private Fire Mains $366 $366 $731
25 Fire Protection Water Supply - Existing System Modifications $183 $183 $366 26 Water Storage $366 $549 $915
27 Public Hydrant System $183 $183 $366
28 Energy Storage Systems $183 $183 $367
29 Emergency Responder Radio Coverage $274 $274 $549
30 AST - Fuel Storage Tank $183 $183 $367
31 Fuel Dispensers $183 $183 $367
32 Hazardous Materials - HMIS / H-OCC $274 $366 $640
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
489 19 CLICK HERE to Return to Agenda
Fee *
Fee Description Plan Review
Permit /
Inspection Total Notes
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
33 High-piled Combustible Storage $274 $366 $640
34 Solar PV Power System (Commercial) $183 $183 $367
35 Special Event Structure / Tent $183 $183 $367
36 Gas Detection System $183 $183 $367
37 Plan Revision Submittals - each $183 $0 $183
38 Plan Resubmittals (in Excess of 3 Reviews) - each $183 $0 $183 39 Failed or Additional Field Inspections (Excessive) - each $0 $183 $183 Operational Permit
40 Exhibits & Tradeshows $91 $183 $274
41 Fire Operational Permit (per hour) bill hourly bill hourly per hour Other
42 Tract access/Hydrant inspection $0 $183 $183
43 Fire Access Gate Assembly $183 $183 $366
44 Special Event Permit $183 $274 $458
45 Pyrotechnic Permit (Review & Standby Charge) $183 $916 $1,099 46 Fire Safety Officer Standby - Events bill hourly bill hourly per hour 47 Fire Miscellaneous (per hour) bill hourly bill hourly per hour 48 Fire Permit Extensions (Admin Processing) $92
Technology Enhancement Fee
49 Technology Enhancement Fee n/a n/a $8
Digital Archiving and Records Management Fee
50 Digital Archiving and Records Management Fee n/a n/a $23 Fee Description Fee * Notes
51 City Assigned Fire Safety Specialist $183 per hour
52 Other County Fire Services
53 City Attorney or other legal review 100% of actual costs 54 Outside Service Providers 100% of actual costs
[a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is necessary or if review fees have been collected as part of the development planning process. [b] Fee is per building.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application, including but not limited to legal review.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
See County Fees
490 20 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
NPDES Ongoing Inspection Fee
1 Food Establishment Facilities $53 per year
2 Hazardous Waste/Materials Facilities $112 per year
Code Compliance
3 Code Compliance Follow-Up, If Required $134 per hour
City of La Quinta
Master Fee Schedule
Schedule of NPDES Ongoing Inspection Fees
491 21 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
Short‐Term Vacation Rental Permit Fee
1 Homeshare Short‐Term Vacation Rental Permit
Homeshare STVR Permit - Less than 5 Bedrooms $261 per year [a] Homeshare STVR Permit - 5 Bedrooms or More $523 per year 2 Primary Residence Short-Term Vacation Permit
Primary Residence STVR Permit - Less than 5 Bedrooms $784 per year [a] Primary Residence STVR Permit - 5 Bedrooms or More $1,307 per year 3 General Short-Term Vacation Rental Permit
General STVR Permit - Less than 5 Bedrooms $1,046 per year [a] General STVR Permit - 5 Bedrooms or More $1,307 per year 4 General Short-Term Vacation Rental Permit (subject to annual mitigation fees) [b] General STVR Permit - Less than 5 Bedrooms (subject to mitigation fees) $261 per year [a];[b] General STVR Permit - 5 Bedrooms or More (subject to mitigation fees) $523 per year [b] 5 Technology Enhancement Fee $8 per year
City of La Quinta
Master Fee Schedule
Schedule of Short-Term Vacation Rental Permit Fees
[a] If special inspection is required, amount will be billed hourly in half-hour increments using the billing rate of the department providing the services. [b] A residential dwelling within a residential project subject to a “mitigation fee,” paid to the city to offset revenue losses caused by the development of the residential project, pursuant to a development agreement with the city, or pursuant to a condition of approval(s) attached to any entitlement approved by the city (including but not limited to a specific plan, subdivision map, or site development permit), pursuant to which short‐term vacation rentals are a permitted use. [As of the adoption of this resolution, the following residential projects qualify under these requirements: Codorniz, La Quinta Desert Villas (Homewood Suites), Legacy Villas, Puerta Azul, and Signature at PGA West] 492 22 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
Medical Cannabis Delivery Services Application
1 Medical Cannabis Delivery Service Application
a) Delivery Service Application - New $532 per year
b) Delivery Service Application - Renewal $532 per year 2 Technology Enhancement Fee $8 per year
City of La Quinta
Master Fee Schedule
Schedule of Medical Cannabis Delivery Application Fees
493 23 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
False Alarm Response
1 Police False Alarm Response [a]
a) 1st False Alarm Response No Charge each
b) 2nd False Alarm Response No Charge each
c) 3rd False Alarm Response $68 each
d) 4th False Alarm Response $119 each
e) 5th and Each Additional False Alarm Response $136 each 2 Fire False Alarm Response [a]
a) 1st False Alarm Response No Charge each
b) 2nd False Alarm Response No Charge each
c) 3rd False Alarm Response $68 each
d) 4th False Alarm Response $313 each
e) 5th and Each Additional False Alarm Response $688 each [a] Based on number of false alarms in a 365 day period.
City of La Quinta
Master Fee Schedule
Schedule of False Alarm Response Fees
494 24 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
1 Vehicle Impound Cost Recovery Fee $259 each
City of La Quinta
Master Fee Schedule
Schedule of Vehicle Impound Cost Recovery Fees
495 25 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
1 Code Enforcement Hourly Rate
a) Code Enforcement Hourly Rate $134 per hour [a]
b) Code Enforcement Hourly Rate - For Outside Agency
Reimbursement Request
$123 per hour [b]
City of La Quinta
Master Fee Schedule
Schedule of Code Enforcement Hourly Rate for Services
[a] Hourly rate for Code Compliance inspections required or requested for which no other fees are listed, requests for special event support, etc.
[b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of various fleet and technology related costs.
496 26 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
1 Pool Drain Permit $26 per permit
City of La Quinta
Master Fee Schedule
Schedule of Pool Drain Permit Fees
497 27 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
1 Home Occupation Permit $114 per permit
2 Home Occupation Permit - Address Change $57 per permit City of La Quinta
Master Fee Schedule
Schedule of Home Occupation Permit Fees
498 28 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
Film/Photography Permit
1 Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property $101 per permit
ii) Private Property with Staging in Public Right of Way $134 per permit iii) Public Property $134 per permit
b) Location Use Fee
i) Private Property $0 per day
ii) Private Property with Staging in Public Right of Way $114 per day [a] iii) Public Property $171 per day [a];[b]
2 Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property $235 per permit
ii) Private Property with Staging in Public Right of Way $369 per permit iii) Public Property $436 per permit
b) Location Use Fee
i) Private Property $0 per day
ii) Private Property with Staging in Public Right of Way $284 per day [a] iii) Public Property $569 per day [a];[b]
Other Fees, If Applicable
3 Pre-Application Meeting (upon request) $268 per meeting 4 City Film Monitor (as needed) $134 per hour
5 Violations:
a) Filming/Photography without a Permit 2 times applicable fees b) Violation of Permit $398 per
violation,
per day
[a] Proposed fee is a market-based rate for exclusive private use of public space/facilities. [b] Does not include any applicable facility rental fees that may apply.
City of La Quinta
Master Fee Schedule
Schedule of Film/Photography Permit Fees
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status; however, the permitting process for filming/photography is still required for these projects. 499 29 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes 1 Bingo Permit
a) Initial $50 per permit
b) Renewal $50 per permit
City of La Quinta
Master Fee Schedule
Schedule of Bingo Permit Fees
500 30 CLICK HERE to Return to Agenda
Fee Description Fee * Unit Notes
1 Black and White Copy - up to 8.5 x 14 $0.15 per single-sided page 2 Black and White Copy - 11 x 17 $0.20 per single-sided page 3 Color Copy - up to 8.5 x 14 $0.25 per single-sided page 4 Color Copy - 11 x 17 $0.50 per single-sided page
5 Oversized Sheets (Plans/Maps) $3.00 per sheet [a]
6 CD/DVD/Flash Drive $5.00 per CD or DVD
7 Agency Credit Card Service Fee 2.5% % of fees paid [b] 8 Processing Fee for Receipt of Non-Sufficient Funds
a) First from Payee $25.00 per occurence [c]
b) Each Subsequent from Payee $35.00 per occurence [c]
[a] If more than two sheets are requested, the City will typically process the request using an outside vendor service. [c] Set by State (Civil Code Section 1719).
City of La Quinta
Master Fee Schedule
Schedule of Administrative Fees
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific request for information/service.
* In addition to the fees identified in this schedule, if a request for electronic records either (1) is for a record normally issued only periodically, or (2) requires data compilation, extraction, or programming, costs will include the cost of producing the copy, including construction, programming and computer services.
[b] Fee is intended to function as a pass-through of credit card transaction vendor charge. Annual updates should be based on vendor charge.
501 31 CLICK HERE to Return to Agenda
Fee Description Fee Unit Notes
1 Appeal to Hearing Officer of Administrative Citation $25 per appeal [a] 2 Appeal of an Administrative Decision to City Manager $250 per appeal [a] 3 Appeal to Construction Board of Appeals $1,500 per appeal [a] 4 Appeal to Planning Commission $1,500 per appeal [a]
5 Appeal to City Council $1,500 per appeal [a]
City of La Quinta
Master Fee Schedule
Schedule of Appeal Fees
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council. 502 32 CLICK HERE to Return to Agenda
Fees
Fee Description
Class I
(per season) Class II Class III Class IV Notes
SPORTS FACILITIES
1 Sports Complex Baseball Diamonds/ Football Field or
La Quinta Park Baseball Diamonds (with or without
field lights)
$10 per
resident/
$15 per nonresident
$25/hour
(per field)
N/A N/A
2 La Quinta Park or Colonel Mitchell Paige Soccer
Fields (with or without field lights)
$10 per
resident/
$15 per nonresident
$25/hour
(per field)
N/A N/A
3 Sports Complex, La Quinta Park, and Colonel Mitchell
Paige Sports Fields (per field)
N/A N/A $25/hour
($40/hour
with lights)
$35/hour
($55/hour
with lights)
4 Sports Complex or La Quinta Park Snack Bar Use $200.00 N/A N/A N/A 5 La Quinta Boys & Girls Club Gymnasium N/A $25/hour $35/hour $45/hour 6 Tennis Courts/Pickleball Courts (per court) N/A $5/hour $5/hour $10/hour PARKS
7 Civic Center Campus, Gazebo, Amphitheater (50
people or less)
N/A $75/hour $125/hour $175/hour
8 Civic Center Campus (Non-profit events with 100
people or more; TUP required)
N/A $150/hour N/A N/A
9 Cove Oasis Trailhead (50 people or less) N/A $75/hour $125/hour $175/hour 10 Fritz Burns or La Quinta Park Party (50 people or less) N/A $50 (4 hours) $65 (4 hours) $90 (4 hours) 11 Fritz Burns or La Quinta Park (Non-profit events with 100 people or more; TUP required)
N/A $100.00 N/A N/A
BUILDINGS
12 Wellness Center Multi-Purpose Room (max capacity
is 200)
$55/hour $75/hour $125/hour $175/hour
13 Museum Meeting Room (Meetings only; max
capacity is 65)
N/A $50/hour $50/hour $50/hour
14 Museum Meeting Room & Courtyard (max capacity
is 150)
N/A $75/hour $125/hour $175/hour
15 Museum Meeting Room, Courtyard, & Upstairs Patio
(max capacity is 175)
N/A $100/hour $150/hour $200/hour
16 Library Community Room (Small events/meetings
with 60 people or less)
N/A $50/hour $50/hour $50/hour
17 Library Classroom (Meetings only; max capacity is
60)
N/A $50/hour $50/hour $50/hour
18 Wellness Center, Library Community Room, and
Museum Kitchen
$10/hour $20/hour $25/hour $30/hour
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
503 33 CLICK HERE to Return to Agenda
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
Proposed Fees Notes
19 Wellness Center Multi-Purpose Room
Museum Meeting Room & Courtyard
Museum Meeting Room & Courtyard w/Upstairs Patio
$500.00
20 La Quinta Park & Sports Complex snack bars $350.00
21 Civic Center Campus (Non-profit events with 100
people or more)
$200.00
22 Museum Meeting Room
Library Community Room
Fritz Burns Tennis Courts (per court)
Fritz Burns or La Quinta Park (Non-profit events w/
100+ people)
$100.00
23 Fritz Burns or La Quinta Park Party $50.00
CLASSIFICATIONS
Class I: 501(c) 3 recreation organizations serving LQ youth (18 and under) Class II: LQ non-profit organizations, community-based organizations, competitive youth sports leagues (DSUSD - Sports Complex Use Only)
Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex) Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses Library Classroom
Cove Oasis Trailhead
Civic Center Campus, Gazebo,
Amphitheater (50 people or less)
SECURITY DEPOSITS (Refundable upon post conditions after use) Sports Fields
Boys & Girls Club Gym
504 34 CLICK HERE to Return to Agenda
Fee Description Notes
SILVERROCK EVENT SITE
(4-Hour Minimum Rental)
1 Permit Processing Fee (per application)
2 Facility Rental Fee (per hour)
3 Security Deposit
a) One Day Event
b) Event Lasting Two or More Days
Fee Description Class II Class III Class IV
Security
Deposit Notes
1 SilverRock - 50 people or less $75/hour $125/hour $175/hour $100 2 SilverRock - Non-profit events with 100
people or more; TUP required
$150/hour N/A N/A $200
3 SilverRock Meeting Room $50/hour $50/hour $50/hour $100
CLASSIFICATION
Non-Profit: 501(c)3 tax organization.
Class II: LQ non-profit organizations, community-based organizations Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex) Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses Partial Park Area Rental
$1,000 $1,000
$500 $500
$284 $284
City of La Quinta
Master Fee Schedule
Schedule of SilverRock Event Site Facility Rental Fees
Entire Park Area Rental
$134 $134
Non-Profit All Others
505 35 CLICK HERE to Return to Agenda
Fee Description Fee Notes
Parking Lot / Open Space Use Fees [a];[b]
1 Daily Use Rate Per Space
a) Per Hour Rate $1.75 [c]
b) Maximum Per Day $14
2 Daily Use Rate Per Area
a) Per Quarter Acre
i) Hourly Rate $55 [c]
ii) Maximum Per Day $440
b) Per Acre
i) Hourly Rate $219 [c]
ii) Maximum Per Day $1,752
[a] Public property use rental is facilitated by obtaining the relevant use permit approval from the Planning Division. [c] Four-hour minimum.
City of La Quinta
Master Fee Schedule
Use of Public Property - Parking Lots and Open Space
[b] As part of permit review and review of potential impacts on the community and facilities, staff will determine if there is a need for a security deposit. Security deposit amount will be determined based on use requirements and will be refundable assuming conditions of rental/use are met.
506 36 CLICK HERE to Return to Agenda
Fee Schedule Showing Current Fees, Proposed Fees, and Proposed Fee Change Percentage ATTACHMENT 1
507 CLICK HERE to Return to Agenda
Table of Contents
Contents Page
1 Building Fees - Mechanical, Plumbing, and Electrical 1 2 Building Fees - Miscellaneous Items 5
3 Building Fees - New Construction 9
4 Building Fees - Other Fees 11
5 Planning Fees 12
6 Public Works Fees 16
7 Fire Fees 24
8 NPDES Ongoing Inspection Fees 28
9 Short-Term Vacation Rental Permit Fees 29
10 Medical Cannabis Delivery Application Fees 30
11 False Alarm Response Fees 31
12 Vehicle Impound Cost Recovery Fees 32
13 Code Enforcement Hourly Rate for Services 33
14 Pool Drain Permit Fees 34
15 Home Occupation Permit Fees 35
16 Film/Photography Permit Fees 36
17 Bingo Permit Fees 37
18 Administrative Fees 38
19 Appeal Fees 39
20 Facility Use Fees 40
21 SilverRock Event Site Facility Rental Fees 42
22 Parking Lot and Open Space Rental Fees 43
508 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
Permit Issuance
1 Permit Issuance (Mechanical, Plumbing, Electrical) $110.88 $110.88 $115.94 $115.94 4.57% Mechanical
2 Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance
$43.77 $29.18 $72.95 $45.77 $30.51 $76.28 4.57%
3 Installation or relocation of each suspended heater, recessed wall heater, or floor-mounted unit heater
$29.18 $14.59 $43.77 $30.51 $15.26 $45.77 4.57%
4 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by the UMC
$14.59 $5.84 $20.42 $15.26 $6.10 $21.36 4.57%
5 Installation or relocation of each boiler, condenser, compressor, or each absorption system
$43.77 $29.18 $72.95 $45.77 $30.51 $76.28 4.57%
6 Air-handling unit, including attached ducts $43.77 $14.59 $58.36 $45.77 $15.26 $61.02 4.57% 7 Evaporative cooler, other than portable-type $14.59 $14.59 $29.18 $15.26 $15.26 $30.51 4.57% 8 Ventilation fan connected to a single-duct $14.59 $5.84 $20.42 $15.26 $6.10 $21.36 4.57% 9 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood
$14.59 $5.84 $20.42 $15.26 $6.10 $21.36 4.57%
10 Each appliance or piece of equipment not classified in other appliance categories, or for which no other fee is listed
$43.77 $43.77 $87.53 $45.77 $45.77 $91.53 4.57%
Mechanical Change-Out
11 Condenser Only $43.77 $29.18 $72.95 $45.77 $30.51 $76.28 4.57% 12 Furnace Only $43.77 $29.18 $72.95 $45.77 $30.51 $76.28 4.57% 13 Other Equipment $43.77 $43.77 $87.53 $45.77 $45.77 $91.53 4.57% 14 Packaged Unit $43.77 $29.18 $72.95 $45.77 $30.51 $76.28 4.57% 15 Repair / Alteration $14.59 $5.84 $20.42 $15.26 $6.10 $21.36 4.57% 16 Split-System $43.77 $87.53 $131.30 $45.77 $91.53 $137.30 4.57% City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical 509 1 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical Plumbing
17 Each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and backflow protection)
$14.59 $14.59 $29.18 $15.26 $15.26 $30.51 4.57%
18 Sewer Connection / Septic Abandonment $29.18 $20.42 $49.60 $30.51 $21.36 $51.87 4.57% 19 Rainwater systems, per drain (inside building) $14.59 $14.59 $29.18 $15.26 $15.26 $30.51 4.57% 20 Water heater and/or vent $14.59 $8.75 $23.34 $15.26 $9.15 $24.41 4.57% 21 Industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps $43.77 $14.59 $58.36 $45.77 $15.26 $61.02 4.57%
22 Installation, alteration, or repair of water piping and/or water-treating equipment, drainage or vent piping, each fixture
$14.59 $14.59 $29.18 $15.26 $15.26 $30.51 4.57%
23 Backflow protective device other than atmospheric-type vacuum breakers $14.59 $5.84 $20.42 $15.26 $6.10 $21.36 4.57% 24 Gas piping system - 1 to 4 outlets $14.59 $29.18 $43.77 $15.26 $30.51 $45.77 4.57% 25 Gas piping system - 5 or more outlets $43.77 $29.18 $72.95 $45.77 $30.51 $76.28 4.57% 26 Solar (Thermal) $29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57% Electrical
New Construction
27 Residential - First 1,000 SF
(includes livable and non-livable SF)
$175.07 $57.77 $232.84 $183.07 $60.41 $243.48 4.57%
28 Residential - Each Additional 1,000 SF
(includes livable and non-livable SF)
$14.88 $6.13 $21.01 $15.56 $6.41 $21.97 4.57%
29 Non-Residential - First 2,000 SF $131.30 $101.54 $232.84 $137.30 $106.18 $243.48 4.57% 30 Non-Residential - Each Additional 2,000 SF $43.77 $11.67 $55.44 $45.77 $12.20 $57.97 4.57% Solar (Photovoltaic)
31 Solar (PV) Less than 10kW $29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57% [a] 32 Solar (PV) Greater than 10kW $43.77 $43.77 $87.53 $45.77 $45.77 $91.53 4.57% [a] 33 Each Additional String (<20) $2.92 $0.73 $3.65 $3.05 $0.76 $3.81 4.57% [a] 510 2 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical Receptacle, Switch, and Lighting Outlets
34 Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters - first 20 $29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57%
35 Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters - each additional $2.92 $0.73 $3.65 $3.05 $0.76 $3.81 4.57%
Lighting Fixtures
36 Lighting fixtures, sockets, or other lamp-holding devices - first 20 $29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57% 37 Lighting fixtures, sockets, or other lamp-holding devices - each add'l $2.92 $0.73 $3.65 $3.05 $0.76 $3.81 4.57% 38 Pole or platform-mounted light replacement, repair or alteration - first 10 $29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57% 39 Pole or platform-mounted light replacement, repair or alteration - each additional
$2.92 $0.73 $3.65 $3.05 $0.76 $3.81 4.57%
Residential Appliances
40 Fixed residential appliances or receptacle outlets for same, including wallmounted electric ovens; counter-mounted cooking tops; electric ranges; selfcontained room, console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding one horsepower (HP) in rating, each
$14.59 $14.59 $29.18 $15.26 $15.26 $30.51 4.57%
Non-Residential Appliances
41 Residential appliances and self-contained, factory-wired, non-residential appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt ampere (KVA) in rating, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each $29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57%
Power Apparatus
42 Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, each
$29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57%
511 3 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical Signs, Outline Lighting, and Marquees
43 Signs, outline lighting systems, or marquees, each $43.77 $58.36 $102.12 $45.77 $61.02 $106.79 4.57% Services
44 Services, each $29.18 $14.59 $43.77 $30.51 $15.26 $45.77 4.57% Temporary Power Services
45 Temporary service power pole or pedestal, including all pole or pedestalmounted receptacle outlets and appurtenances, each$29.18 $20.42 $49.60 $30.51 $21.36 $51.87 4.57% Miscellaneous Apparatus, Conduits, and Conductors
46 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is identified
$29.18 $29.18 $58.36 $30.51 $30.51 $61.02 4.57%
[a] Plan review fees will be waived if approved real time code review software is used. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application. 512 4 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
Addition
1 Residential Addition
a) Residential Addition - Up to 100 SF $147.06 $206.58 $353.64 $153.78 $216.02 $369.80 4.57% [a] b) Residential Addition - Each Additional 500 SF $75.28 $21.01 $96.29 $78.72 $21.97 $100.69 4.57% [a] c) Structural Review bill hourly (1 hour min.) bill hourly (1 hour min.) 4.57% [a] 2 Non-Residential Addition
a) Non-Residential Addition - Up to 100 SF $169.12 $237.57 $406.68 $176.84 $248.42 $425.27 4.57% [a] b) Non-Residential Addition - Each Additional 500 SF $86.57 $24.16 $110.73 $90.53 $25.26 $115.79 4.57% [a] c) Structural Review bill hourly (1 hour min.) bill hourly (1 hour min.) 4.57% [a] Antenna
3 Dish > 2 Ft $43.77 $161.06 $204.83 $45.77 $168.42 $214.19 4.57% 4 Cellular/Mobile Phone $175.07 $248.60 $423.66 $183.07 $259.96 $443.03 4.57% 5 Equipment Shelter $43.77 $117.30 $161.06 $45.77 $122.66 $168.42 4.57% Appeal
6 Appeal bill hourly (1 hour min.) bill hourly (1 hour min.) 4.57% Awning/Canopy (Supported by Building)
7 Awning/Canopy $17.51 $248.60 $266.10 $18.31 $259.96 $278.26 4.57% Balcony Addition
8 Balcony Addition $175.07 $204.83 $379.90 $183.07 $214.19 $397.26 4.57% Block Wall
9 Block Wall - First 100 LF $58.36 $72.95 $131.30 $61.02 $76.28 $137.30 4.57% 10 Block Wall - Each Addt'l 50 LF $17.51 $17.51 $18.31 $18.31 4.57% 11 Retaining / Combination Wall - Each 50 LF $17.51 $17.51 $18.31 $18.31 4.57% Carport
12 Carport - First $87.53 $117.30 $204.83 $91.53 $122.66 $214.19 4.57% 13 Carport - Each Additional $87.53 $46.68 $134.22 $91.53 $48.82 $140.35 4.57% Compliance Survey/Special Inspection
14 Compliance Survey/Special Inspection $87.53 $218.84 $306.37 $91.53 $228.84 $320.37 4.57% Demolition
15 Demolition $29.76 $105.04 $134.80 $31.12 $109.84 $140.96 4.57% 16 Demolition - Interior $43.77 $117.30 $161.06 $45.77 $122.66 $168.42 4.57% 17 Demolition - Exterior $43.77 $131.30 $175.07 $45.77 $137.30 $183.07 4.57% City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
513 5 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Fence
18 Fence - First 100 LF $57.77 $73.53 $131.30 $60.41 $76.89 $137.30 4.57% 19 Fence - Each Additional 50 LF $17.51 $17.51 $18.31 $18.31 4.57% Fireplace
20 Fireplace $175.07 $262.60 $437.67 $183.07 $274.60 $457.67 4.57% Flag/Lighting Pole
21 Flag/Lighting Pole - First $43.77 $117.30 $161.06 $45.77 $122.66 $168.42 4.57% 22 Flag/Lighting Pole - Each Additional $17.51 $5.25 $22.76 $18.31 $5.49 $23.80 4.57% Grading
23 Residential Precise Grading (Tract Homes) - Per Home $161.06 $161.06 $168.42 $168.42 4.57% [b] 24 Residential Precise Grading (Custom Home) - Lot <= 7,000 SF $43.77 $43.77 $87.53 $45.77 $45.77 $91.53 4.57% 25 Residential Precise Grading (Custom Home) - Lot > 7,000 SF $43.77 $218.84 $262.60 $45.77 $228.84 $274.60 4.57% Partition
26 Partition $87.53 $161.06 $248.60 $91.53 $168.42 $259.96 4.57% Patio Cover / Covered Porch / Lattice
27 Standard, Open, Pre-Engineered (First) $117.30 $115.54 $232.84 $122.66 $120.83 $243.48 4.57% 28 Standard, Enclosed, Pre-Engineered (First) $117.30 $159.31 $276.61 $122.66 $166.59 $289.25 4.57% 29 Special Design (First) $161.06 $203.08 $364.14 $168.42 $212.36 $380.78 4.57% 30 Each Additional $58.36 $43.77 $102.12 $61.02 $45.77 $106.79 4.57% Pool / Spa
31 Swimming Pool / Spa $218.84 $119.05 $337.88 $228.84 $124.49 $353.32 4.57% 32 Detached Spa / Water Feature $218.84 $218.84 $228.84 $228.84 4.57% 33 Gunite Alteration / Resurfacing $218.84 $119.05 $337.88 $228.84 $124.49 $353.32 4.57% 34 Equipment Change-out Alone $29.18 $110.88 $140.05 $30.51 $115.94 $146.46 4.57% Remodel
35 Non-Structural Review - Up to 100 SF $59.52 $162.81 $222.34 $62.24 $170.25 $232.50 4.57% [a] 36 Non-Structural Review - Each Additional 500 SF $26.26 $21.01 $47.27 $27.46 $21.97 $49.43 4.57% [a] 37 Structural Review bill hourly (1 hour min.) bill hourly (1 hour min.) 4.57% [a] Replacement of Plans/Job Card
38 Replacement of Job Copy of Approved Plans $248.60 $248.60 $259.96 $259.96 4.57% 39 Replacement of Inspection Record Card $43.77 $43.77 $45.77 $45.77 4.57% 514 6 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Re-Roof
40 Re-Roof - Up to 2,000 SF $59.52 $119.05 $178.57 $62.24 $124.49 $186.73 4.57% 41 Re-Roof - Each Additional 1,000 SF $14.01 $14.01 $14.65 $14.65 4.57% Sign
42 Monument Sign - First $87.53 $161.06 $248.60 $91.53 $168.42 $259.96 4.57% 43 Monument Sign - Each Additional $29.76 $29.76 $31.12 $31.12 4.57% 44 Wall/Awning Sign - First $29.76 $105.04 $134.80 $31.12 $109.84 $140.96 4.57% 45 Wall/Awning Sign - Each Additional $29.76 $29.76 $59.52 $31.12 $31.12 $62.24 4.57% Storage Racks
46 Storage Racks - First 100 LF $29.76 $115.54 $145.31 $31.12 $120.83 $151.95 4.57% 47 Storage Racks - Each Additional 100 LF $14.01 $14.01 $14.65 $14.65 4.57% Stucco Application
48 Stucco Application - First 500 SF $29.76 $89.28 $119.05 $31.12 $93.37 $124.49 4.57% 49 Stucco Application - Each Additional 500 SF $8.75 $8.75 $9.15 $9.15 4.57% Temporary Trailer
50 Temporary Trailer $175.07 $175.07 $350.14 $183.07 $183.07 $366.14 4.57% Utility Release
51 Electrical Utility Release $87.53 $87.53 $91.53 $91.53 4.57% Window / Sliding Glass Door / Other Fenestration
52 Retrofit/Repair - Up to 7 $73.53 $71.78 $145.31 $76.89 $75.06 $151.95 4.57% 53 Retrofit/Repair - Each Additional 5 $12.25 $12.25 $12.81 $12.81 4.57% 54 New/Alteration - First $116.71 $133.05 $249.76 $122.05 $139.13 $261.18 4.57% 55 New/Alteration - Each Additional $12.25 $14.01 $26.26 $12.81 $14.65 $27.46 4.57% Administrative
Plan Check Initial Deposit - For Various Non-OTC Items
56 a) Miscellaneous Items $175.07 $175.07 $183.07 $183.07 4.57% [c] 57 b) New Construction varies varies 3.56% [c] [d]
58 Plan Check / Permit Extension Processing $117.30 $117.30 $122.66 $122.66 4.57% 59 Plan Check / Revisions (per hour) $183.07 $183.07 n/a 60 Change of Contractor, Architect, Owner Processing $117.30 $117.30 $122.66 $122.66 4.57% 61 Request/Research for Alternative Methods/Product Review bill hourly (1 hour min.) bill hourly (1 hour min.) 4.57% 62 Temporary Certificate of Occupancy $525.20 $525.20 $549.21 $549.21 4.57% [e] 63 Disabled Access Compliance Inspection $175.07 $175.07 $183.07 $183.07 4.57% 515 7 CLICK HERE to Return to Agenda
Current Fee Proposed Fee
Fee Description Permit
Plan
Check Total Permit
Plan
Check Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
64 Partial Inspection Fee $87.53 $87.53 $91.53 $91.53 4.57% [f] 65 Re-inspection Fee $87.53 $87.53 $91.53 $91.53 4.57% [f] 66 Excess Plan Check Fee bill hourly bill hourly 4.57% [g] 67 Investigation Fee for Work Commenced Without a Permit equal to permit fee equal to permit fee 4.57% 68 Refunds
a) Fees Erroneously Paid or Collected by the City n/a [h] b) Fees Prior to Work Being Commenced n/a [i]
c) 180 Days After Payment of Fees n/a [j]
[d] Initial deposit varies depending on project details. [e] Per issuance, each extension will be assessed fee at each occurrence. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application, including the cost of structural engineering review services. [a] Fee is intended to capture structural and non-structural reviews. Mechanical, Electrical, and Plumbing review and inspection fees are collected separately. 100% refund
up to 80% refund
no refund
[j] Whether work has commenced or not, no fees are refundable more than 180 days after their payment. up to 80% refund
no refund
100% refund
[i] No fees are refundable once the work covered by them is commenced. [c] Non-Refundable Initial Deposit. For projects that request permit issuance the intitial deposit amount will be credited against total fees. [f] The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees. [g] The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for the provision of all subsequent re-check services. [b] Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based on the number of sheets submitted for plan review. See Public Works fee schedule.
[h] The Building Official may authorize refunding of any fee paid, or portion thereof, which was erroneously paid or collected by the city. 516 8 CLICK HERE to Return to Agenda
Fee Description Current Fee - Permit * Proposed Fee - Permit * Change New Construction
1 $1 - $10,000 $175.07 for the first
$5,000, plus
$52.52 for each additional $1,000 or
fraction thereof, to and
including $10,000
$183.07 for the first
$5,000, plus
$54.92 for each additional $1,000 or
fraction thereof, to and
including $10,000
4.57%
2 $10,001 - $25,000 $437.67 for the first
$10,000, plus
$11.67 for each additional $1,000 or
fraction thereof, to and
including $25,000
$457.67 for the first
$10,000, plus
$12.20 for each additional $1,000 or
fraction thereof, to and
including $25,000
4.57%
3 $25,001 - $200,000 $612.74 for the first
$25,000, plus
$9.00 for each additional $1,000 or
fraction thereof, to and
including $200,000
$640.74 for the first
$25,000, plus
$9.41 for each additional $1,000 or
fraction thereof, to and
including $200,000
4.57%
4 $200,000 and Up $2,188.35 for the first
$200,000,
plus
$4.50 for each additional $1,000 or
fraction thereof
$2,288.36 for the first
$200,000,
plus
$4.71 for each additional $1,000 or
fraction thereof
4.57%
Fee Description Current Fee - Plan Check * Proposed Fee - Plan Check * Change (Project Valuation)
5 $1 - $10,000 $175.07 for the first
$5,000, plus
$87.53 for each additional $1,000 or
fraction thereof, to and
including $10,000
$183.07 for the first
$5,000, plus
$91.53 for each additional $1,000 or
fraction thereof, to and
including $10,000
4.57%
6 $10,001 - $25,000 $612.74 for the first
$10,000, plus
$20.42 for each additional $1,000 or
fraction thereof, to and
including $25,000
$640.74 for the first
$10,000, plus
$21.36 for each additional $1,000 or
fraction thereof, to and
including $25,000
4.57%
7 $25,001 - $200,000 $919.11 for the first
$25,000, plus
$3.25 for each additional $1,000 or
fraction thereof, to and
including $200,000
$961.11 for the first
$25,000, plus
$3.40 for each additional $1,000 or
fraction thereof, to and
including $200,000
4.57%
8 $200,000 and Up $1,488.08 for the first
$200,000,
plus
$2.60 for each additional $1,000 or
fraction thereof
$1,556.08 for the first
$200,000,
plus
$2.72 for each additional $1,000 or
fraction thereof
4.57%
Fee Description
Current Fee - Plan Check for
Multiple Structures - Each Additional **
Proposed Fee - Plan Check for
Multiple Structures - Each Additional ** Change
(Project Valuation)
9 All Valuations $58.36 $61.02 4.57%
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - New Construction
* The new construction fees identified in this fee schedule include the cost of structural engineering review services currently conducted by outside service providers. Additional fees will be collected for the provision of all plan review services beyond second review. 517 9 CLICK HERE to Return to Agenda
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - New Construction
Fee Description Current Fee Proposed Fee Change
10 Building Department Staff $175 per hour $183 per hour 4.57% 11 City Attorney/Other Legal Rvw 100% of actual costs 100% of actual costs 12 Outside Service Providers 100% of actual costs 100% of actual costs ** Fee applies when multiple identical units are submitted for review and permitted at the same time.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
* The permit fees identified in this fee schedule include initial inspection and one re-inspection. Additional fees will be collected for the provision of all subsequent permit inspection services. See re-inspection fee and partial inspection fee for applicable fees. * The base plan check fees identified in this fee schedule include initial check and one re-check. Additional fees will be collected for the provision of all subsequent re-check services. 518 10 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Notes
Strong Motion Instrumentation (SMI)
Fee Calculation
1 Residential $0.50 or valuation x .00013 $0.50 or valuation x .00013 0.00% 2 Commercial $0.50 or valuation x .00028 $0.50 or valuation x .00028 0.00% Art In Public Places (AIPP) Fee Calculation [a]
3 Residential $20.00 or 1/4 of 1% of value exceeding
$200,000
$20.00 or 1/4 of 1% of value exceeding
$200,000
0.00%
4 Commercial $20.00 or 1/2 of 1% of value $20.00 or 1/2 of 1% of value 0.00% Building Standards Administration Special Revolving Fund (SB 1473) Fee Calculation
[b]
5 Valuation:
a) $1 - $25,000 $1 $1 0.00%
b) $25,001 - $50,000 $2 $2 0.00%
c) $50,001 - $75,000 $3 $3 0.00%
d) $75,001 - $100,000 $4 $4 0.00%
e) Every $25,000 or fraction thereof above $100,000 Add $1 Add $1 0.00% Technology Enhancement Fee
6 Technology Enhancement Fee (per permit) $8 $8 0.00%
Digital Archiving and Records Management Fee
7 Digital Archiving and Records Management Fee
a) OTC Permit/Application $11 $12 4.57%
b) All Others $22 $23 4.57%
[a] Source: La Quinta Municipal Code 2.65.060.
[b] Source: California Health and Safety Code Section 18931.6 City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Other Fees
519 11 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes Temporary Use
1 Temporary Use Permit - Minor (Standard) $435 $455 4.57% 2 Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
bill per hour, with $435 base fee bill per hour, with $455 base fee 4.57% 3 Temporary Use Permit - Major (Standard) $2,276 $2,380 4.57% 4 Temporary Use Permit - Major
(Requests Requiring Additional Effort)
bill per hour, with $2,276 base fee bill per hour, with $2,380 base fee 4.57% Minor Use
5 Minor Use Permit bill per hour, with $435 base fee bill per hour, with $455 base fee 4.57% 6 Minor Use Permit - Amendment bill per hour, with $435 base fee bill per hour, with $455 base fee 4.57% Conditional Use
7 Conditional Use Permit bill per hour, with $6,974 base fee bill per hour, with $7,292 base fee 4.57% 8 Conditional Use Permit - Planned Unit Dev. bill per hour, with $6,974 base fee bill per hour, with $7,292 base fee 4.57% 9 Conditional Use Permit - Amendment bill per hour, with $3,399 base fee bill per hour, with $3,555 base fee 4.57% 10 Conditional Use Permit - Time Extension $1,838 $1,922 4.57% Expedited Review Fee
11 Expedited Review Fee 1.5x
standard
fee
1.5x
standard
fee
n/a [a]
Site Development
12 Development Agreement bill per hour, with $3,618 base fee bill per hour, with $3,783 base fee 4.57% [b] 13 Site Development Permit - Planning Commission bill per hour, with $9,687 base fee bill per hour, with $10,130 base fee 4.57% 14 Site Development Permit - Administrative bill per hour, with $8,287 base fee bill per hour, with $8,665 base fee 4.57% 15 Site Development Permit - Amendment bill per hour, with $5,077 base fee bill per hour, with $5,309 base fee 4.57% 16 Site Development Permit - Time Extension $1,838 $1,922 4.57% 17 Modification by Applicant bill per hour, with $435 base fee bill per hour, with $455 base fee 4.57% 18 Minor Adjustment bill per hour, with $435 base fee bill per hour, with $455 base fee 4.57% 19 Underground Waiver n/a bill per hour, with $2,746 base fee n/a 20 Variance bill per hour, with $2,626 base fee bill per hour, with $2,746 base fee 4.57% Landscape Plan
21 Final Landscape Plan $2,188 $2,288 4.57%
Housing
22 Senate Bill (SB) 330 Application Review $1,401 $1,465 4.57% City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
520 12 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Conceptual Design Review
23 Conceptual Design Review $2,451 $2,563 4.57% [c]
Signs
24 A-Frame Sign Permit $0 $0 n/a
25 Sign Permit $386 $404 4.57%
26 Sign Program bill per hour, with $3,093 base fee bill per hour, with $3,234 base fee 4.57% 27 Sign Program Amendment $1,050 $1,098 4.57%
Zoning
28 Zone Change bill per hour, with $10,212 base fee bill per hour, with $10,679 base fee 4.57% 29 Director's Determination $440 $461 4.57%
30 Certificate of Compliance $549 $574 4.57%
31 Zoning Letter - Basic Property Information $286 $299 4.57% 32 Zoning Letter - Basic Property Information with
Additional Research Required
$1,488 $1,556 4.57%
33 Zoning Text Amendment bill per hour, with $10,271 base fee bill per hour, with $10,740 base fee 4.57% Street Name Change
34 Street Name Change $2,188 $2,288 4.57%
Historical Structures
35 Landmark Designation/Cert of Appropriateness $1,435 $1,501 4.57% Environmental Review
36 Environmental Assessment $525
36 Recordation of Exemption $175 $183 4.57%
37 Initial Study (ND/MND) bill per hour, with $3,501 base fee bill per hour, with $3,661 base fee 4.57% 38 Environmental Impact Report bill per hour, with $10,154 base fee bill per hour, with $10,618 base fee 4.57% General/Specific Plan
39 Specific Plan bill per hour, with $11,788 base fee bill per hour, with $12,327 base fee 4.57% 40 Specific Plan - Amendment bill per hour, with $5,194 base fee bill per hour, with $5,431 base fee 4.57% 41 General Plan Amendment bill per hour, with $11,379 base fee bill per hour, with $11,899 base fee 4.57% Map
42 Tentative Parcel Map bill per hour, with $5,485 base fee bill per hour, with $5,736 base fee 4.57% 43 Tentative Parcel Map - Waiver $1,488 $1,556 4.57%
44 Tentative Parcel Map - Amendment bill per hour, with $3,268 base fee bill per hour, with $3,417 base fee 4.57% 45 Tentative Parcel Map - Revision bill per hour, with $3,268 base fee bill per hour, with $3,417 base fee 4.57% 521 13 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
46 Tentative Parcel Map - Time Extension $1,050 $1,098 4.57% 47 Tentative Tract Map bill per hour, with $9,104 base fee bill per hour, with $9,520 base fee 4.57% 48 Tentative Tract Map - Amendment bill per hour, with $4,318 base fee bill per hour, with $4,516 base fee 4.57% 49 Tentative Tract Map - Revision bill per hour, with $4,318 base fee bill per hour, with $4,516 base fee 4.57% 50 Tentative Tract Map - Time Extension (CC or PC) $2,013 $2,105 4.57% 51 Tentative Tract Map - Time Extension (Admin) $1,138 $1,190 4.57% 52 Tentative Condominium Map bill per hour, with $9,104 base fee bill per hour, with $9,520 base fee 4.57% 53 Amended Final Parcel Map (Entitlement Support) bill per hour, with $4,377 base fee bill per hour, with $4,577 base fee 4.57% 54 Amended Final Tract Map (Entitlement Support) bill per hour, with $7,003 base fee bill per hour, with $7,323 base fee 4.57% Zoning Clearance - Planning Plan Check
55 Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential $88 $92 4.57%
b) New Construction - Single Family Residential $175 $183 4.57% c) New Construction - 2-4 Residential Units $263 $275 4.57% d) New Construction - 5+ Residential Units $700 $732 4.57% e) New Construction - Non-Residential $350 $366 4.57%
f) Alterations/Additions - Non-Residential $175 $183 4.57% Scanning
56 Scanning Fee $175
Technology Enhancement Fee
56 Technology Enhancement Fee $8 $8 0.00%
Digital Archiving and Records Management Fee
57 Digital Archiving and Records Management Fee
a) OTC Permit/Application $11 $12 4.57%
b) All Others $22 $23 4.57%
Appeal
58 Appeal $1,500 $1,500 0.00%
522 14 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Fee Description Current Fee * Proposed Fee * Change Notes 59 Planning Department Staff $175 per hour $183 per hour 4.57% 60 City Attorney or Other Legal Review pass-through of 100% of actual costs pass-through of 100% of actual costs 61 Outside Service Providers pass-through of 100% of actual costs pass-through of 100% of actual costs [b] In addition to the fee shown for Development Agreement, the City shall collect a $2,000 $5,000 initial deposit to offset City Attorney costs. [c] 50% of fee may be credited toward entitlement application submittal. * In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
[a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff availability and workload.
Note: If multiple applications are received concurrently from the same applicant for different projects that require similar application review and are generally similar except for location, one project location shall pay 100% of application review fee(s), the fee(s) for each project application at other locations shall be 50% of the original fee(s). 523 15 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes Land Subdivision
1 Parcel Map:
a) Final Parcel Map
i) Initial Sheet $2,714 per sheet $2,838 per sheet 4.57% ii) Each Additional Sheet $788 per sheet $824 per sheet 4.57% b) Final Parcel Map - Amendment
i) Initial Sheet $2,714 per sheet $2,838 per sheet 4.57% ii) Each Additional Sheet $788 per sheet $824 per sheet 4.57% c) Substantial Conformance Review
i) Initial Sheet $3,195 per sheet $3,341 per sheet 4.57% ii) Each Additional Sheet $1,401 per sheet $1,465 per sheet 4.57% 2 Tract Map:
a) Final Tract Map
i) Initial Sheet $2,889 per sheet $3,021 per sheet 4.57% ii) Each Additional Sheet $875 per sheet $915 per sheet 4.57% b) Final Tract Map - Amendment
i) Initial Sheet $2,889 per sheet $3,021 per sheet 4.57% ii) Each Additional Sheet $875 per sheet $915 per sheet 4.57% c) Substantial Conformance Review
i) Initial Sheet $3,195 per sheet $3,341 per sheet 4.57% ii) Each Additional Sheet $1,401 per sheet $1,465 per sheet 4.57% 3 Reversion to Acreage:
a) Initial Sheet $2,976 per sheet $3,112 per sheet 4.57% b) Each Additional Sheet $788 per sheet $824 per sheet 4.57% 4 Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment $2,101 per request $2,197 per request 4.57% b) Parcel Merger $2,101 per request $2,197 per request 4.57% City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
524 16 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
5 Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
$2,145 per request $2,243 per request 4.57%
b) Vacation of Street/Public ROW $2,626 per request $2,746 per request 4.57% 6 Land Survey
a) Record of Survey $569 per request $595 per request 4.57% b) Certificate of Correction $744 per request $778 per request 4.57% Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet $1,707 per sheet $1,785 per sheet 4.57% ii) Each Additional Sheet $875 per sheet $915 per sheet 4.57% iii) Revisions - Initial Sheet $1,248 per sheet $1,305 per sheet 4.57% iv) Revisions - Each Additional Sheet $875 per sheet $915 per sheet 4.57% b) Precise Grading - Commercial
i) Initial Sheet $2,145 per sheet $2,243 per sheet 4.57% ii) Each Additional Sheet $1,225 per sheet $1,281 per sheet 4.57% iii) Revisions - Initial Sheet $1,598 per sheet $1,671 per sheet 4.57% iv) Revisions - Each Additional Sheet $1,225 per sheet $1,281 per sheet 4.57% c) Precise Grading - Tract Homes
i) Initial Sheet $1,313 per sheet $1,373 per sheet 4.57% ii) Each Additional Sheet $219 per sheet $229 per sheet 4.57% iii) Revisions - Initial Sheet $679 per sheet $710 per sheet 4.57% iv) Revisions - Each Additional Sheet $219 per sheet $229 per sheet 4.57% d) Precise Grading - Custom Home [a]
e) PM10
i) Initial Sheet $636 per sheet $665 per sheet 4.57%
ii) Each Additional Sheet $0 per sheet $0 per sheet
iii) Revisions - Initial Sheet $489 per sheet $512 per sheet 4.57% iv) Revisions - Each Additional Sheet $0 per sheet $0 per sheet 525 17 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
f) Street Improvements
i) Initial Sheet $1,970 per sheet $2,060 per sheet 4.57% ii) Each Additional Sheet $1,050 per sheet $1,098 per sheet 4.57% iii) Revisions - Initial Sheet $1,423 per sheet $1,488 per sheet 4.57% iv) Revisions - Each Additional Sheet $1,050 per sheet $1,098 per sheet 4.57% g) Storm Drain
i) Initial Sheet $1,794 per sheet $1,876 per sheet 4.57% ii) Each Additional Sheet $1,050 per sheet $1,098 per sheet 4.57% iii) Revisions - Initial Sheet $1,423 per sheet $1,488 per sheet 4.57% iv) Revisions - Each Additional Sheet $1,050 per sheet $1,098 per sheet 4.57% h) Signing and Striping
i) Initial Sheet $1,619 per sheet $1,693 per sheet 4.57% ii) Each Additional Sheet $875 per sheet $915 per sheet 4.57% iii) Revisions - Initial Sheet $1,248 per sheet $1,305 per sheet 4.57% iv) Revisions - Each Additional Sheet $875 per sheet $915 per sheet 4.57% i) Traffic Signal
i) Initial Sheet $1,444 per sheet $1,510 per sheet 4.57% ii) Each Additional Sheet $700 per sheet $732 per sheet 4.57% iii) Revisions - Initial Sheet $1,073 per sheet $1,122 per sheet 4.57% iv) Revisions - Each Additional Sheet $700 per sheet $732 per sheet 4.57% j) Sidewalk
i) Initial Sheet $1,269 per sheet $1,327 per sheet 4.57% ii) Each Additional Sheet $525 per sheet $549 per sheet 4.57% iii) Revisions - Initial Sheet $898 per sheet $939 per sheet 4.57% iv) Revisions - Each Additional Sheet $525 per sheet $549 per sheet 4.57% k) Traffic Control Plan $88 per sheet $92 per sheet 4.57% l) Record Drawings Review
i) Initial Sheet $919 per sheet $961 per sheet 4.57%
ii) Each Additional Sheet $175 per sheet $183 per sheet 4.57% 526 18 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
m) Hydrology Report $1,882 per report $1,968 per report 4.57% i) Revisions $875 per report $915 per report 4.57%
n) Traffic Study $1,444 per study $1,510 per study 4.57% o) WQMP Report
i) With Prior Entitlement $1,707 per report $1,785 per report 4.57% ii) Without Prior Entitlement $2,057 per report $2,151 per report 4.57% iii) Revisions $875 per report $915 per report 4.57%
p) SWPPP/Erosion Control Plan $1,970 per plan $2,060 per plan 4.57% i) Revisions $700 per plan $732 per plan 4.57%
q) Sewer and Water
i) Initial Sheet $1,401 per sheet $1,465 per sheet 4.57% ii) Each Additional Sheet $525 per sheet $549 per sheet 4.57% iii) Revisions - Initial Sheet $875 per sheet $915 per sheet 4.57% iv) Revisions - Each Additional Sheet $525 per sheet $549 per sheet 4.57% 8 Plan Review (>3 Reviews) $175 per hour $183 per hour 4.57% 9 Expedited Plan Review Fee 1.5x standard fee 1.5x standard fee [b] 10 Permit Inspection
a) Rough Grading
i) First 3 Acres $3,501 $3,661 4.57%
ii) Each Additional Acre $875 $915 4.57%
iii) Last One Acre $438 $458 4.57%
b) Precise Grading
i) First 3 Acres $3,501 $3,661 4.57%
ii) Each Additional Acre $875 $915 4.57%
iii) Last One Acre $438 $458 4.57%
c) Precise Grading - Tract Homes $161 $168 4.57% [c]
d) Precise Grading - Custom Homes $88 $92 4.57% [c]
527 19 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
e) PM10
i) < 10 Acres $4,202 $4,394 4.57% [d]
ii) 10 - 50 Acres $6,302 $6,590 4.57% [d]
iii) 51 - 200 Acres $8,403 $8,787 4.57% [d]
iv) > 200 Acres $12,605 $13,181 4.57% [d]
f) Street Improvements - Off-Site
i) First 1,000 LF $5,602 $5,858 4.57%
ii) Each Additional 1,000 LF $4,902 $5,126 4.57%
iii) Last 1,000 LF $3,151 $3,295 4.57%
g) Street Improvements - On-Site
i) First 1,000 LF $3,851 $4,028 4.57%
ii) Each Additional 1,000 LF $3,151 $3,295 4.57%
iii) Last 1,000 LF $2,101 $2,197 4.57%
h) Storm Drain
i) First 1,000 LF $3,326 $3,478 4.57%
ii) Each Additional 1,000 LF $2,626 $2,746 4.57%
iii) Last 1,000 LF $1,751 $1,831 4.57%
i) Signing and Striping
i) First 1,000 LF $1,751 $1,831 4.57%
ii) Each Additional 1,000 LF $1,050 $1,098 4.57%
iii) Last 1,000 LF $525 $549 4.57%
j) Traffic Signal $4,727 $4,943 4.57%
k) NPDES $2,101 $2,197 4.57%
l) Bond Reduction Request $2,363 $2,471 4.57%
m) Final Inspection/Acceptance $3,151 $3,295 4.57%
528 20 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
n) Traffic Control Only
i) One Day $353 $370 4.57%
ii) Two - Five Days $707 $739 4.57%
iii) Each Additional Day (Up to 10 Days) $353 $370 4.57% iv) 11+ Days $4,114 $4,302 4.57%
o) Cut/Bore $788 $824 4.57%
p) Driveway
i) Residential $190 $199 4.57%
ii) Commercial $1,138 $1,190 4.57%
q) Excavation / Trenching
i) First 100 LF $788 $824 4.57%
ii) Each Additional 100 LF $350 $366 4.57%
iii) Last 100 LF $175 $183 4.57%
r) Sidewalk
i) First 100 Lineal Feet $917 $917 0.00%
ii) Each Additional 100 Lineal Feet $500 $500 0.00%
iii) Last 100 Lineal Feet $167 $167 0.00%
s) Sewer and Water and/or Water $1,401 $1,465 4.57%
t) Night Work $438 $458 4.57%
11 Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA) $2,101 $2,197 4.57% b) SIA - Time Extension $1,225 per request $1,281 per request 4.57% c) Assignment & Assumptions Agreement $2,276 per request $2,380 per request 4.57% d) Flood Plain Research/FEMA App $1,050 per request $1,098 per request 4.57% e) Bid Protest Review $788 per request $824 per request 4.57% 12 Reactivation of Permit
a) Reactivation of an Expired Permit / Permit Extension 10% of original permit fee
one year extension 10% of original permit
fee
one year extension
529 21 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
13 Technology Enhancement Fee
Technology Enhancement Fee $8 $8 0.00%
Digital Archiving and Records Management Fee
14 Digital Archiving and Records Management Fee
a) OTC Permit/Application $11 $12 4.57%
b) All Others $22 $23 4.57%
15 Transportation Permits
a) Annual $90 $90 0.00%
b) Single Event $16 $16 0.00%
16 Refunds
a) Refunds for Plan Checks
i) If plan check has not begun 90% refund 90% refund [e] ii) If 1st plan check has begun 30% refund 30% refund [e] iii) If 2nd plan check has begun 10% refund 10% refund [e] iv) Past 2nd plan check no refund no refund [e]
b) Refunds for Permits - Permit issued and no work has
commenced
Up to 50% of original
permit fee
Up to 50% of original
permit fee
[f]
Fee Description Current Fee * Proposed Fee *
Fee
Change Notes
17 Public Works Personnel $175 per hour $183 per hour 4.57% 18 City Attorney or Other Legal Review 100% pass-through of actual cost
100% pass-through of actual
cost
19 Outside Service Providers 100% pass-through of actual cost
100% pass-through of actual
cost
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any discrete costs incurred from the use of outside service providers required to process the specific application. Exception for contract traffic engineering and plan review consulting costs, which are included in the fees listed above.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
530 22 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Notes City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
[a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot size of the custom home. See Building fee schedule, Grading section.
[b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [e] Upon request of the applicant, the director may authorize refunding a percentage of fees paid with the following schedule. If any portion of the plan check fee has been paid out by the city to another agency or consultant for services rendered in connection with the plan check, no refund of that portion of the fee shall be made. [f] Upon request of the applicant, the director may authorize refunding of not more than 50% of fees paid when no work has been done under an issued permit. In no case shall the refund exceed the cost of services provided to date of cancellation of permit issuance. [d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro-rated based on the number of months permitted. [c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See Building fee schedule, Grading section. 531 23 CLICK HERE to Return to Agenda
Current Fee * Proposed Fee *
Fee Description Plan Review
Permit /
Inspection Total Plan Review
Permit /
Inspection Total Change Notes
Construction-Related Fire Review and Inspection Fees
1 New Multi-Residential (Hotel, Motel, Apartments, Condominiums) $525 $350 $875 $549 $366 $915 4.57% 2 New Commercial / Industrial $525 $438 $963 $549 $458 $1,007 4.57% 3 Residential Addition / Remodel $87 $87 $174 $91 $91 $182 4.57% 4 Commercial Tenant Improvement $263 $175 $438 $274 $183 $458 4.57% 5 Commercial / Industrial Addition or Remodel $263 $263 $525 $274 $274 $549 4.57% 6 New Single Family Dwelling (Access/Water) $87 $87 $174 $91 $91 $182 4.57% [a] 7 Automatic Suppression System $350 $350 $699 $366 $366 $731 4.57% 8 Kitchen Hood Suppression System $263 $175 $438 $274 $183 $458 4.57% 9 Fire Suppression System - Existing Modifications varies varies varies $183 $183 $366 * 10 Fire Alarm Systems $613 $525 $1,138 $641 $549 $1,190 4.57% 11 Fire Alarm-Monitoring and Tenant Improvements $263 $175 $438 $274 $183 $458 4.57% 12 Fire Sprinkler Systems - Single Family Detached
a) 1-50 Sprinkler Heads $263 $175 $438 $274 $183 $458 4.57% [a] b) 51-100 Sprinkler Heads $263 $263 $525 $274 $274 $549 4.57% [a] c) Over 100 Sprinkler Heads $263 $350 $612 $274 $366 $640 4.57% [a] 13 Fire Sprinkler Systems - Tract Master Plan $263 $0 $263 $274 $0 $274 4.57% 14 Fire Sprinkler Systems - Tract Production Home $0 $175 $175 $0 $183 $183 4.57% 15 Fire Sprinkler Systems - Multi-Family 3 or more units $350 $263 $612 $366 $274 $640 4.57% [b] 16 Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF $438 $263 $700 $458 $274 $732 4.57% 17 Fire Sprinkler Systems - Commercial / Industrial 35,001 - 75,000 SF $525 $307 $832 $549 $321 $870 4.57% 18 Fire Sprinkler Systems - Commercial / Industrial 75,001 - 120,000 SF $613 $438 $1,051 $641 $458 $1,099 4.57% 19 Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF $700 $613 $1,314 $732 $641 $1,374 4.57% 20 Fire Sprinkler Systems - Tenant Improvement $175 $350 $525 $183 $366 $549 4.57% 21 Fire Pumps $350 $350 $699 $366 $366 $731 4.57%
22 Fire Standpipe Systems $263 $350 $612 $274 $366 $640 4.57% 23 Smoke Controls Systems $613 $525 $1,138 $641 $549 $1,190 4.57% City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
532 24 CLICK HERE to Return to Agenda
Current Fee * Proposed Fee *
Fee Description Plan Review
Permit /
Inspection Total Plan Review
Permit /
Inspection Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
24 Private Fire Mains $350 $350 $699 $366 $366 $731 4.57% 25 Fire Protection Water Supply - Existing System Modifications varies varies varies $183 $183 $366 * 26 Water Storage varies varies varies $366 $549 $915 *
27 Public Hydrant System varies varies varies $183 $183 $366 * 28 Energy Storage Systems $175 $175 $351 $183 $183 $367 4.57% 29 Emergency Responder Radio Coverage $263 $263 $525 $274 $274 $549 4.57% 30 AST - Fuel Storage Tank $175 $175 $351 $183 $183 $367 4.57% 31 Fuel Dispensers $175 $175 $351 $183 $183 $367 4.57%
32 Hazardous Materials - HMIS / H-OCC $263 $350 $612 $274 $366 $640 4.57% 33 High-piled Combustible Storage $263 $350 $612 $274 $366 $640 4.57% 34 Solar PV Power System (Commercial) $175 $175 $351 $183 $183 $367 4.57% 35 Special Event Structure / Tent $175 $175 $351 $183 $183 $367 4.57% 36 Gas Detection System $175 $175 $351 $183 $183 $367 4.57% 37 Plan Revision Submittals - each $175 $0 $175 $183 $0 $183 4.57% 38 Plan Resubmittals (in Excess of 3 Reviews) - each $175 $0 $175 $183 $0 $183 4.57% 39 Failed or Additional Field Inspections (Excessive) - each $0 $175 $175 $0 $183 $183 4.57% Operational Permit
40 Exhibits & Tradeshows $87 $175 $263 $91 $183 $274 4.57% 41 Fire Operational Permit (per hour) bill hourly bill hourly per hour bill hourly bill hourly per hour n/a Other
42 Tract access/Hydrant inspection $0 $175 $175 $0 $183 $183 4.57% 43 Fire Access Gate Assembly varies varies varies $183 $183 $366 * 44 Special Event Permit $175 $263 $438 $183 $274 $458 4.57% 45 Pyrotechnic Permit (Review & Standby Charge) $175 $876 $1,051 $183 $916 $1,099 4.57% 46 Fire Safety Officer Standby - Events bill hourly bill hourly per hour bill hourly bill hourly per hour n/a 47 Fire Miscellaneous (per hour) bill hourly bill hourly per hour bill hourly bill hourly per hour n/a 48 Fire Permit Extensions (Admin Processing) $88 $92
Technology Enhancement Fee
49 Technology Enhancement Fee n/a n/a $8 n/a n/a $8 0.00% 533 25 CLICK HERE to Return to Agenda
Current Fee * Proposed Fee *
Fee Description Plan Review
Permit /
Inspection Total Plan Review
Permit /
Inspection Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
Digital Archiving and Records Management Fee
50 Digital Archiving and Records Management Fee n/a n/a $11 - $22 n/a n/a $23 varies a) OTC Permit / Application n/a n/a $11 n/a n/a $12 4.57% b) All Others n/a n/a $22 n/a n/a $23 4.57%
534 26 CLICK HERE to Return to Agenda
Current Fee * Proposed Fee *
Fee Description Plan Review
Permit /
Inspection Total Plan Review
Permit /
Inspection Total Change Notes
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
Fee Description Current Fee * Proposed Fee * Notes Notes 51 City Assigned Fire Safety Specialist $175 per hour $183 per hour 4.57% 52 Other County Fire Services
53 City Attorney or other legal review 100% of actual costs 100% of actual costs 54 Outside Service Providers 100% of actual costs 100% of actual costs * Not a new permitting requirement. Separating permit out for implementation to Tyler EnerGov. [b] Fee is per building.
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific application, including but not limited to legal review.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
[a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is necessary or if review fees have been collected as part of the development planning process.
See County Fees See County Fees
535 27 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes NPDES Ongoing Inspection Fee
1 Food Establishment Facilities $51 $53 4.57% per year
2 Hazardous Waste/Materials Facilities $107 $112 4.57% per year Code Compliance
3 Code Compliance Follow-Up, If Required $129 $134 4.57% per hour City of La Quinta
Master Fee Schedule
Schedule of NPDES Ongoing Inspection Fees
536 28 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes Short‐Term Vacation Rental Permit Fee
1 Homeshare Short‐Term Vacation Rental Permit
Homeshare STVR Permit - Less than 5 Bedrooms $250 $261 4.57% per year [a] Homeshare STVR Permit - 5 Bedrooms or More $500 $523 4.57% per year 2 Primary Residence Short-Term Vacation Permit
Primary Residence STVR Permit - Less than 5 Bedrooms $750 $784 4.57% per year [a] Primary Residence STVR Permit - 5 Bedrooms or More $1,250 $1,307 4.57% per year 3 General Short-Term Vacation Rental Permit
General STVR Permit - Less than 5 Bedrooms $1,000 $1,046 4.57% per year [a] General STVR Permit - 5 Bedrooms or More $1,250 $1,307 4.57% per year 4 General Short-Term Vacation Rental Permit (subject to annual mitigation fees) [b] General STVR Permit - Less than 5 Bedrooms (subject to mitigation fees) $250 $261 4.57% per year [a];[b] General STVR Permit - 5 Bedrooms or More (subject to mitigation fees) $500 $523 4.57% per year [b] 5 Technology Enhancement Fee $8 $8 4.57% per year
City of La Quinta
Master Fee Schedule
Schedule of Short-Term Vacation Rental Permit Fees
[a] If special inspection is required, amount will be billed hourly in half-hour increments using the billing rate of the department providing the services. [b] A residential dwelling within a residential project subject to a “mitigation fee,” paid to the city to offset revenue losses caused by the development of the residential project, pursuant to a development agreement with the city, or pursuant to a condition of approval(s) attached to any entitlement approved by the city (including but not limited to a specific plan, subdivision map, or site development permit), pursuant to which short‐term vacation rentals are a permitted use. [As of the adoption of this resolution, the following residential projects qualify under these requirements: Codorniz, La Quinta Desert Villas (Homewood Suites), Legacy Villas, Puerta Azul, and Signature at PGA West]
537 29 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes Medical Cannabis Delivery Services Application
1 Medical Cannabis Delivery Service Application
a) Delivery Service Application - New $509 $532 4.57% per year b) Delivery Service Application - Renewal $509 $532 4.57% per year 2 Technology Enhancement Fee $8 $8 4.57% per year
City of La Quinta
Master Fee Schedule
Schedule of Medical Cannabis Delivery Application Fees
538 30 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes False Alarm Response
1 Police False Alarm Response [a]
a) 1st False Alarm Response No Charge No Charge n/a each b) 2nd False Alarm Response No Charge No Charge n/a each c) 3rd False Alarm Response $65 $68 4.57% each
d) 4th False Alarm Response $114 $119 4.57% each
e) 5th and Each Additional False Alarm Response $130 $136 4.57% each 2 Fire False Alarm Response [a]
a) 1st False Alarm Response No Charge No Charge n/a each b) 2nd False Alarm Response No Charge No Charge n/a each c) 3rd False Alarm Response $65 $68 4.57% each
d) 4th False Alarm Response $299 $313 4.57% each
e) 5th and Each Additional False Alarm Response $658 $688 4.57% each [a] Based on number of false alarms in a 365 day period.
City of La Quinta
Master Fee Schedule
Schedule of False Alarm Response Fees
539 31 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes 1 Vehicle Impound Cost Recovery Fee $248 $259 4.57% each City of La Quinta
Master Fee Schedule
Schedule of Vehicle Impound Cost Recovery Fees
540 32 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes 1 Code Enforcement Hourly Rate
a) Code Enforcement Hourly Rate $129 $134 4.57% per hour [a] b) Code Enforcement Hourly Rate - For Outside Agency
Reimbursement Request
$118 $123 4.57% per hour [b]
City of La Quinta
Master Fee Schedule
Schedule of Code Enforcement Hourly Rate for Services
[a] Hourly rate for Code Compliance inspections required or requested for which no other fees are listed, requests for special event support, etc. [b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of various fleet and technology related costs. 541 33 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes 1 Pool Drain Permit $25 $26 4.57% per permit City of La Quinta
Master Fee Schedule
Schedule of Pool Drain Permit Fees
542 34 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes 1 Home Occupation Permit $109 $114 4.57% per permit
2 Home Occupation Permit - Address Change $54 $57 4.57% per permit City of La Quinta
Master Fee Schedule
Schedule of Home Occupation Permit Fees
543 35 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes Film/Photography Permit
1 Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property $96 $101 4.57% per permit
ii) Private Property with Staging in Public Right of Way $128 $134 4.57% per permit iii) Public Property $128 $134 4.57% per permit
b) Location Use Fee
i) Private Property $0 $0 0.00% per day
ii) Private Property with Staging in Public Right of Way $109 $114 4.57% per day [a] iii) Public Property $163 $171 4.57% per day [a];[b]
2 Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property $225 $235 4.57% per permit
ii) Private Property with Staging in Public Right of Way $353 $369 4.57% per permit iii) Public Property $417 $436 4.57% per permit
b) Location Use Fee
i) Private Property $0 $0 0.00% per day
ii) Private Property with Staging in Public Right of Way $272 $284 4.57% per day [a] iii) Public Property $544 $569 4.57% per day [a];[b]
Other Fees, If Applicable
3 Pre-Application Meeting (upon request) $257 $268 4.57% per meeting 4 City Film Monitor (as needed) $128 $134 4.57% per hour 5 Violations:
a) Filming/Photography without a Permit 2 times applicable fees 2 times applicable fees 0.00% b) Violation of Permit $381 $398 4.57% per
violation,
per day
[a] Proposed fee is a market-based rate for exclusive private use of public space/facilities. [b] Does not include any applicable facility rental fees that may apply.
City of La Quinta
Master Fee Schedule
Schedule of Film/Photography Permit Fees
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income Tax Status; however, the permitting process for filming/photography is still required for these projects.
544 36 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes 1 Bingo Permit a) Initial $50 $50 0.00% per permit
b) Renewal $50 $50 0.00% per permit
City of La Quinta
Master Fee Schedule
Schedule of Bingo Permit Fees
545 37 CLICK HERE to Return to Agenda
Fee Description Current Fee * Proposed Fee * Change Unit Notes 1 Black and White Copy - up to 8.5 x 14 $0.15 $0.15 0.00% per single-sided page 2 Black and White Copy - 11 x 17 $0.20 $0.20 0.00% per single-sided page 3 Color Copy - up to 8.5 x 14 $0.25 $0.25 0.00% per single-sided page 4 Color Copy - 11 x 17 $0.50 $0.50 0.00% per single-sided page 5 Oversized Sheets (Plans/Maps) $3.00 $3.00 0.00% per sheet [a] 6 CD/DVD/Flash Drive $5.00 $5.00 0.00% per CD or DVD
7 Agency Credit Card Service Fee 2.5% 2.5% 0.00% % of fees paid [b] 8 Processing Fee for Receipt of Non-Sufficient Funds
a) First from Payee $25.00 $25.00 0.00% per occurence [c] b) Each Subsequent from Payee $35.00 $35.00 0.00% per occurence [c] [a] If more than two sheets are requested, the City will typically process the request using an outside vendor service. [b] Fee is intended to function as a pass-through of credit card transaction vendor charge. Annual updates should be based on vendor charge. [c] Set by State (Civil Code Section 1719).
City of La Quinta
Master Fee Schedule
Schedule of Administrative Fees
* In addition to the fees identified in this schedule, the City will pass-through to the applicant any fees imposed by other agencies and any discrete costs incurred from the use of outside service providers required to process the specific request for information/service. * In addition to the fees identified in this schedule, if a request for electronic records either (1) is for a record normally issued only periodically, or (2) requires data compilation, extraction, or programming, costs will include the cost of producing the copy, including construction, programming and computer services. 546 38 CLICK HERE to Return to Agenda
Fee Description Current Fee Proposed Fee Change Unit Notes 1 Appeal to Hearing Officer of Administrative Citation $25 $25 0.00% per appeal [a] 2 Appeal of an Administrative Decision to City Manager $250 $250 0.00% per appeal [a] 3 Appeal to Construction Board of Appeals $1,500 $1,500 0.00% per appeal [a] 4 Appeal to Planning Commission $1,500 $1,500 0.00% per appeal [a] 5 Appeal to City Council $1,500 $1,500 0.00% per appeal [a] City of La Quinta
Master Fee Schedule
Schedule of Appeal Fees
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose of providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council.
547 39 CLICK HERE to Return to Agenda
Current Fees Proposed Fees
Fee Description
Class I
(per season) Class II Class III Class IV
Class I
(per season) Class II Class III Class IV Change Notes
SPORTS FACILITIES
1 Sports Complex Baseball Diamonds/ Football Field or La Quinta Park Baseball Diamonds (with or without field lights) $10 per
resident/
$15 per nonresident
$25/hour
(per field)
N/A N/A $10 per
resident/
$15 per nonresident
$25/hour
(per field)
N/A N/A 0.00%
2 La Quinta Park or Colonel Mitchell Paige Soccer Fields (with or without field lights)
$10 per
resident/
$15 per nonresident
$25/hour
(per field)
N/A N/A $10 per
resident/
$15 per nonresident
$25/hour
(per field)
N/A N/A 0.00%
3 Sports Complex, La Quinta Park, and Colonel Mitchell Paige Sports Fields (per field)
N/A N/A $25/hour
($40/hour with
lights)
$35/hour
($55/hour
with lights)
N/A N/A $25/hour
($40/hour with
lights)
$35/hour
($55/hour
with lights)
0.00%
4 Sports Complex or La Quinta Park Snack Bar Use $200.00 N/A N/A N/A $200.00 N/A N/A N/A 0.00% 5 La Quinta Boys & Girls Club Gymnasium N/A $25/hour $35/hour $45/hour N/A $25/hour $35/hour $45/hour 0.00% 6 Tennis Courts/Pickleball Courts (per court) N/A $5/hour $5/hour $10/hour N/A $5/hour $5/hour $10/hour 0.00% PARKS
7 Civic Center Campus, Gazebo, Amphitheater (50 people or less)
N/A $75/hour $125/hour $175/hour N/A $75/hour $125/hour $175/hour 0.00% 8 Civic Center Campus (Non-profit events with 100 people or more; TUP required)
N/A $150/hour N/A N/A N/A $150/hour N/A N/A 0.00%
9 Cove Oasis Trailhead (50 people or less) N/A $75/hour $125/hour $175/hour N/A $75/hour $125/hour $175/hour 0.00% 10 Fritz Burns or La Quinta Park Party (50 people or less) N/A $50 (4 hours) $65 (4 hours) $90 (4 hours) N/A $50 (4 hours) $65 (4 hours) $90 (4 hours) 0.00% 11 Fritz Burns or La Quinta Park (Non-profit events with 100 people or more; TUP required)
N/A $100.00 N/A N/A N/A $100.00 N/A N/A 0.00%
BUILDINGS
12 Wellness Center Multi-Purpose Room (max capacity is 200) $55/hour $75/hour $125/hour $175/hour $55/hour $75/hour $125/hour $175/hour 0.00% 13 Museum Meeting Room (Meetings only; max capacity is 65) N/A $50/hour $50/hour $50/hour N/A $50/hour $50/hour $50/hour 0.00% 14 Museum Meeting Room & Courtyard (max capacity is 150) N/A $75/hour $125/hour $175/hour N/A $75/hour $125/hour $175/hour 0.00% 15 Museum Meeting Room, Courtyard, & Upstairs Patio
(max capacity is 175)
N/A $100/hour $150/hour $200/hour N/A $100/hour $150/hour $200/hour 0.00% 16 Library Community Room (Small events/meetings with 60 people or less)
N/A $50/hour $50/hour $50/hour N/A $50/hour $50/hour $50/hour 0.00% 17 Library Classroom (Meetings only; max capacity is 60) N/A $50/hour $50/hour $50/hour N/A $50/hour $50/hour $50/hour 0.00% 18 Wellness Center, Library Community Room, and Museum
Kitchen
$10/hour $20/hour $25/hour $30/hour $10/hour $20/hour $25/hour $30/hour 0.00% City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
548 40 CLICK HERE to Return to Agenda
City of La Quinta
Master Fee Schedule
Current Fees Proposed Fees Fee Schange Notes
19 Wellness Center Multi-Purpose Room
Museum Meeting Room & Courtyard
Museum Meeting Room & Courtyard w/Upstairs Patio
$500.00 $500.00 0.00%
20 La Quinta Park & Sports Complex snack bars $350.00 $350.00 0.00% 21 Civic Center Campus (Non-profit events with 100 people or more)
$200.00 $200.00 0.00%
22 Museum Meeting Room
Library Community Room
Fritz Burns Tennis Courts (per court)
Fritz Burns or La Quinta Park (Non-profit events w/ 100+ people)
$100.00 $100.00 0.00%
23 Fritz Burns or La Quinta Park Party $50.00 $50.00 0.00%
CLASSIFICATIONS
Class I: 501(c) 3 recreation organizations serving LQ youth (18 and under) Class II: LQ non-profit organizations, community-based organizations, competitive youth sports leagues (DSUSD - Sports Complex Use Only)
Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex) Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses Library Classroom
Cove Oasis Trailhead
Civic Center Campus, Gazebo, Amphitheater
(50 people or less)
Sports Fields
Boys & Girls Club Gym
Library Classroom
Cove Oasis Trailhead
Civic Center Campus, Gazebo, Amphitheater
(50 people or less)
SECURITY DEPOSITS (Refundable upon post conditions after use) Sports Fields
Boys & Girls Club Gym
549 41 CLICK HERE to Return to Agenda
Fee Description Fee Change Notes
SILVERROCK EVENT SITE
(4-Hour Minimum Rental)
1 Permit Processing Fee (per application) 0.00%
2 Facility Rental Fee (per hour) 0.00%
3 Security Deposit
a) One Day Event 0.00%
b) Event Lasting Two or More Days 0.00%
Fee Description Class II Class III Class IV
Security
Deposit Class II Class III Class IV
Security
Deposit Fee Change Notes
1 SilverRock - 50 people or less $75/hour $125/hour $175/hour $100 $75/hour $125/hour $175/hour $100 0.00% 2 SilverRock - Non-profit events with 100
people or more; TUP required
$150/hour N/A N/A $200 $150/hour N/A N/A $200 0.00%
3 SilverRock Meeting Room $50/hour $50/hour $50/hour $100 $50/hour $50/hour $50/hour $100 0.00%
CLASSIFICATION
Non-Profit: 501(c)3 tax organization.
Class II: LQ non-profit organizations, community-based organizations Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex) Class IV: LQ business and profit organizations; non-city residents, organizations, and businesses $128 $128
City of La Quinta
Master Fee Schedule
Schedule of SilverRock Event Site Facility Rental Fees
Entire Park Area Rental
Non-Profit All Others
Current Fee Proposed Fees
$128 $128
Partial Park Area Rental
Non-Profit All Others
$272 $272
$500 $500
$272 $272
Current Fee Proposed Fees
$500 $500
$1,000 $1,000 $1,000 $1,000
550 42 SUPPLEMENTAL STAFF REPORT 7/18/2023 - REVISED SILVERROCK EVENT SITE FEES - NO CPI INCREASE Fee Description Current Fee Proposed Fee Change Notes
Parking Lot / Open Space Use Fees [a];[b]
1 Daily Use Rate Per Space
a) Per Hour Rate $1.75 $1.75 [c]
b) Maximum Per Day $14 $14
2 Daily Use Rate Per Area
a) Per Quarter Acre
i) Hourly Rate $55 $55 [c]
ii) Maximum Per Day $440 $440
b) Per Acre
i) Hourly Rate $219 $219 [c]
ii) Maximum Per Day $1,752 $1,752
[a] Public property use rental is facilitated by obtaining the relevant use permit approval from the Planning Division. [c] Four-hour minimum.
City of La Quinta
Master Fee Schedule
Use of Public Property - Parking Lots and Open Space
[b] As part of permit review and review of potential impacts on the community and facilities, staff will determine if there is a need for a security deposit. Security deposit amount will be determined based on use requirements and will be refundable assuming conditions of rental/use are met. if CPI increase
rounded to
nearest $0.25
per space
↓
43 0.00%
551
SUPPLEMENTAL STAFF REPORT 7/18/2023 - REVISED PARKING LOT / OPEN SPACE USE FEES - NO CPI INCREASE 552
CLICK HERE to Return to Agenda
City of La Quinta
Planning Fees
Cost of Service Calculation
Labor Time Hourly Rates Cost of Service
Fee Description
Avg.
Planning
Hours
Avg.
Fire Hours
FBHR
Planning
FBHR
Fire
Target
Hourly Rate
Cost of Svc
at FBHR
Cost of Svc
at Target
Hrly Rate
Current
Fee Fee Type
Current
Cost
Recovery
Proposed
Fee Fee Type
Proposed
Cost Recov
1 Underground Waiver 14.00 1.00 $231 $194 $183 $3,426 $2,746 n/a ‐ new hrly w/ min n/a $2,746 hrly w/ min 79% Cost Recovery
1 COST OF SERVICE ANALYSIS ATTACHMENT 2
553
CLICK HERE to Return to Agenda
City of La Quinta
Fire Prevention FeesCost of Service Calculation
Labor Time (Hours) Rate Cost of Service Current Fee / Current Cost Recovery Fee Description
Plan
Review
Permit /
Inspection Total
Fully‐
Burdened
Hourly
Plan
Review
Permit /
Inspection Total
Plan
Review
Permit /
Inspection Total
Current
Cost
Recovery
1 Fire Suppression System ‐ Existing Modifications 1.00 1.00 2.00 x $194 = $194 $194 $389 varies varies varies2 Fire Protection Water Supply ‐ Existing System Modifications 1.00 1.00 2.00 x $194 = $194 $194 $389 varies varies varies3 Water Storage 2.00 3.00 5.00 x $194 = $389 $583 $972 varies varies varies 4 Public Hydrant System 1.00 1.00 2.00 x $194 = $194 $194 $389 varies varies varies 5 Fire Access Gate Assembly 1.00 1.00 2.00 x $194 = $194 $194 $389 varies varies varies 2 554
CLICK HERE to Return to Agenda
City of La Quinta
Fire Prevention FeesCost of Service CalculationFee Description 1 Fire Suppression System ‐ Existing Modifications
2 Fire Protection Water Supply ‐ Existing System Modifications 3 Water Storage4 Public Hydrant System5 Fire Access Gate Assembly Rate Proposed Fee Recovery Change
Target
Hourly Rate
Plan
Review
Permit /
Inspection Total
Target Cost
Recovery Fee Percent
$183 $183 $183 $366 94% varies varies$183 $183 $183 $366 94% varies varies$183 $366 $549 $915 94% varies varies$183 $183 $183 $366 94% varies varies$183 $183 $183 $366 94% varies varies 3 555
CLICK HERE to Return to Agenda
City of La Quinta
Digital Archiving and Records Management FeeCost of Service CalculationFee Description Svc Time Est. Hourly
Rate
Svc Cost at
FBHR Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery Fee Change
Percent
Change
1 Digital Archiving and Records Management Fee 0.40 x5 $ 7 =2 $ 3 $ 22 97% $ 23 100% $ 1 3% 4 556
CLICK HERE to Return to Agenda
Bureau of Labor Statistics
Series Id:
Series Title:
Area:
Item:
Base Period:
Years:
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual HALF1 HALF2 2017 100.000
2018 100.916 101.897 102.929 103.139 103.241 103.616 102.732 102.023 103.441 2019 103.991 104.749 105.959 105.816 106.412 106.573 105.697 104.998 106.397 2020 107.143 107.162 106.899 107.640 108.201 108.626 107.672 107.068 108.275 2021 109.550 110.981 113.222 114.682 115.557 117.206 113.875 111.588 116.162 2022 118.963 122.127 123.893 125.262 125.272 125.983 123.784 122.018 125.551 2023 127.683 127.707
CPI >>> 4.57%
All items in Riverside-San Bernardino-Ontario, CA,
all urban consumers, not seasonally adjusted Riverside-San Bernardino-Ontario, CA All items
DECEMBER 2017=100
2017 to 2023
CPI for All Urban Consumers (CPI-U)
Original Data Value
CUURS49CSA0,CUUSS49CSA0
Not Seasonally Adjusted
Source: Bureau of Labor Statistics Generated on: April 18, 2023 (06:23:28 PM) ATTACHMENT 3
557 CLICK HERE to Return to Agenda
ATTACHMENT 4
558
CLICK HERE to Return to Agenda
11. AIRPORT COMMISSION MEETING AGENDA
Airport Conference Room, Palm Springs International Airport 3400 E. Tahquitz Canyon Way, Palm Springs, CA 92262
Wednesday, June 21, 2023 - 5:30 P.M.
Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference.
There will be in-person public access to the meeting location.
To submit your public comment to the Airport Commission electronically. Material may be emailed to: [email protected] - Transmittal prior to the start of the meeting is required. Any correspondence received during or after the meeting will be distributed to the Airport Commission and retained for the official record.
This is a hybrid in-person and virtual meeting. To virtually observe the meeting or to virtually provide public comments, please use the following Zoom link
https://us02web.zoom.us/j/86019815290?pwd=ZitOZDIyeGZhNUNEQTVkU29nTUdPdz09 or call (669) 900-6833 and enter Meeting ID: 860 1981 5290 - Passcode: 583916 City of Palm Springs: Riverside County:
Paul Slama
City of Cathedral City:
Tony Michaelis
City of Palm Desert:
Aftab Dada - Chair David Feltman Kevin Wiseman
Kevin J. Corcoran
Vice Chair Ken Hedrick City of Indian Wells:
Paul Budilo
City of Coachella:
Denise Delgado
City of Rancho Mirage:
Keith Young Gerald Adams Scott G. Miller
Patricia Breslin John Payne City of La Quinta:
Kathleen Hughes
City of Desert Hot Springs:
Jan Pye
City of Indio:
Todd Burke M. Guillermo Suero Rick Wise
Palm Springs City Staff
Scott C. Stiles Harry Barrett Jr., A.A.E. Jeremy Keating City Manager Airport Executive Director Assistant Airport Director
1. CALL TO ORDER – PLEDGE OF ALLEGIANCE
2. POSTING OF AGENDA
3. ROLL CALL
4. ACCEPTANCE OF AGENDA
5. PUBLIC COMMENTS: Limited to three minutes on any subject within the purview of the Commission
6. APPROVAL OF MINUTES: Minutes of the Airport Commission Regular Meeting of February 15, 2023, and Special Meeting of February 28, 2023 REPORTS AND INFORMATIONAL ITEM NO. 27
559 CLICK HERE to Return to Agenda
Airport Commission Meeting Agenda
June 21, 2023 – Page 2
_______________________________________________________________________________________
7. DISCUSSION AND ACTION ITEMS:
7.A Palm Springs Air Museum Ground Lease
7.B Marketing Update
7.C Financial Summary Update
7.D Concessions Update
7.E Projects and Airport Capital Improvement Program Update
8. EXECUTIVE DIRECTOR REPORT
9. COMMISSIONERS REQUESTS AND REPORTS
10. REPORT OF COUNCIL ACTIONS:
10.A Past City Council Actions
10.B Future City Council Actions
11. RECEIVE AND FILE:
11.A Airline Activity Report May 2023
11.B Airline Activity Report Fiscal Year Comparison
12. COMMITTEES:
12.A Future Committee Meetings
ADJOURNMENT:
The Airport Commission will adjourn to a Regular Meeting on July 19, 2023, at 5:30 P.M.
AFFIDAVIT OF POSTING
I, Harry Barrett, Jr., Airport Executive Director, City of Palm Springs, California, hereby certify this agenda was posted on June 15, 2023, in accordance with established policies and procedures.
PUBLIC NOTICES
Pursuant to G.C. Section 54957.5(b)(2) the designated office for inspection of records in connection with the meeting is the Office of the City Clerk, City Hall, 3200 E. Tahquitz Canyon Way. Complete Agenda Packets are available for public inspection at: City Hall Office of the City Clerk. Agenda and staff reports are available on the City’s website www.palmspringsca.gov. If you would like additional information on any item appearing on this agenda, please contact the Office of the City Clerk at (760) 323-8204.
It is the intention of the City of Palm Springs to comply with the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at this meeting, or in meetings on a regular basis, you will need special assistance beyond what is normally provided, the City will attempt to accommodate you in every reasonable manner. Please contact the Department of Aviation, (760) 318-3800, at least 48 hours prior to the meeting to inform us of your particular needs and to determine if accommodation is feasible. 560 CLICK HERE to Return to Agenda
Palm Springs Airport Commission Report – June 21, 2023 Meeting This meeting was brief (50 min.) due to the final game of the CV Firebirds Public Comments – Steve Rosenburg – a commissioner from 10 years ago wanted to remind the current commissioners to not underestimate the growth of the airport and to plan accordingly.
Discussion and Action Items:
Proposed 5 year ground lease to Palm Springs Air Museum for additional aircraft parking – As the air museum has constructed an additional 20,000 square foot temperature-controlled hanger to accommodate the growing collection of relics from past wars with the goal of memorializing these historic events and have grown their facilities with a full restaurant open to the public and expanded the aircraft apron and public roadway. Now there is a need to accommodate additional aircraft parking. Thus the request to enter into a ground lease of 2.5 acres for a term of five years with an option to extend. This was approved unanimously by the airport commission.
Marketing – Daniel Meier, Director of Marketing is ready to launch the new logo and campaign on July 6 which will roll-out over the next few months. Phase 1 includes website, social medial, digital advertising, uniforms, removal of old logos, new business cards and public introduction.
Alaska has announced service to JFK beginning December 14, 2023 – April 22, 2024 and Jet Blue will once again provide service to NYC starting on October 31, 2023 with an Airbus 320.
April Total Pax count: 5.9% increase over 2022 with 379,352 total passengers May Total Pax count: 5.6% increase over 2022 with 233,239 total passengers Although PSP will be down seats compared to 2022 throughout the summer months, we are still up on the number of seats being utilized. A major concern overall for the aviation industry, is the pilot shortage that has affected overall airline production. It will take our nation time to rebuild the ranks of this union from the pandemic.
Concessions Update – Jeremy Keating, Assistant Airport Director, notes that there is progress behind the scenes, milestones are being established, and meetings held weekly. A new Aviation Planner has been hired to will help bridge the gap between the city planner and airport staff this month. An improvement is already noticed. In August another local vendor outreach will happen with goal of gaining incremental community business becoming involved as an airport concession.
Victoria Carpenter, Finance Director was brief with her budget report and Financial Summary Update – the net balance as of May 31, 2023 are of the key 4 airport funds.
Fund 405 – FY 22-23 – 8,002,852 compare to 2,430,030 FY 21/22 Fund 410 – FY 22-23 – 4,884,867 compare to 4,247,781 FY 21/22 Fund 415 - FY 22-23 - 50,805,746 compare to 41,069,398 FY 21/22 561 CLICK HERE to Return to Agenda
Fund 416 – FY 22- 23 –3,824,100 revenue compare to 14, 515,035 actual 21/22 – this fund for capital projects will net at zero once all of the grants are depleted.
Executive Director Report – Harry Barrett was unable to attend the meeting this evening. He included two reports with our agenda on the update of Airport Capital Improvement Programs and Emerging Developments. Discussion will commence on these two reports at the July 2023 meeting.
Report of Council Actions – None
Future Committees – meetings included in commission packet.
Commissioners Requests and Reports – None
Report of Council Actions - None
Next Airport Commission meeting will be a regular meeting on July 19, 2023 at 5:30 pm F
Y
2 2
-
2 3
A
c
u
t
a
l
-
562 CLICK HERE to Return to Agenda
FINANCING AUTHORITY MINUTES Page 1 of 2 JUNE 20, 2023
SPECIAL MEETING
FINANCING AUTHORITY
SPECIAL MEETING
MINUTES
TUESDAY, JUNE 20, 2023
CALL TO ORDER
A special meeting of the La Quinta Financing Authority was called to order at 6:44 p.m. by Chairperson Evans.
PRESENT: Authority Members Fitzpatrick, Peña, McGarrey, Sanchez, Chair Evans ABSENT: None
AUTHORITY MEMBER SANCHEZ LEFT THE DAIS AT 6:45 P.M.
CONFIRMATION OF AGENDA – Confirmed
PUBLIC COMMENT – None
BUSINESS SESSION
1. ADOPT RESOLUTION OF THE LA QUINTA FINANCING AUTHORITY TO APPROVE FISCAL YEAR 2023/24 BUDGET [RESOLUTION NO. FA 2023-001] Finance Director Martinez presented the staff report, which is on file in the Clerk’s Office.
AUTHORITY MEMBER SANCHEZ RETURNED TO THE DAIS AT 6:47 P.M. FOR
THE REMAINDER OF THE MEETING
MOTION – A motion was made and seconded by Authority Members Fitzpatrick/Peña to adopt Resolution No. FA 2023-001 approving Fiscal Year 2023/24 Financing Authority Budget, as recommended:
A RESOLUTION OF THE FINANCING AUTHORITY OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING FISCAL YEAR 2023/24 BUDGET Motion passed unanimously.
FINANCING AUTHORITY MEMBERS' ITEMS – None
ADJOURNMENT
There being no further business, it was moved and seconded by Authority Members Peña/Fitzpatrick to adjourn at 6:48 p.m. Motion passed unanimously.
REPORTS AND INFORMATIONAL ITEM NO. 28563 CLICK HERE to Return to Agenda FINANCING AUTHORITY MINUTES Page 2 of 2 JUNE 20, 2023
SPECIAL MEETING
Respectfully submitted,
MONIKA RADEVA, Authority Secretary
La Quinta Financing Authority
564 CLICK HERE to Return to Agenda