2023-2024: Roofing and Skylight Replacements/Repairs: $147,270 2024-2025: Slurry Seal Parking Lot: $21,980
2024-2025: Painting – Exterior: $91,850
2024-2025: Carpet: (Heritage Room, common areas, and City offices): $116,712 2024-2025: Replacement of Kitchen Equipment: $82,400
2024-2025: Replacement of Room Partitions: $100,940
2025-2026: Painting – Interior: $163,383
2025-2026: HVAC, Boilers: $26,523
The reserve study recommends increasing annual funding for capital improvements that starts at $474,500 in FY 2023-2024 and increases to $1,118,190 in FY 2052-2053.
However, the reserve study was written by a consultant that traditionally writes these reports for homeowner associations. Homeowner associations have a legal and fiduciary duty to maintain reserve levels at least 70% of the reserve study’s component replacement costs (based on the current replacement cost, age, and useful life remaining). The ideal goal for a homeowner association is 100%. Therefore, this report recommends funding that will eventually result in reserves at or near 100% of the current cost of replacement of known reserve components.
This reserve goal for homeowner associations does not apply and is impracticable for municipalities. Municipalities traditionally have access to other sources of funding, which may include State and Federal grants. If homeowner association recommended reserve methodology were used, there would be very few cities that would have reserves sufficient to meet those standards.
Therefore, City staff developed an alternative “level funding” table which indicates the City should expect to spend an average of approximately $500,000 per year on capital improvement projects at the Community Center over the next 30 years.
During future budgets, City staff recommends allocating approximately $500,000 per year in the City’s budget to address future capital improvements at the Community Center.
4.8 Packet Pg. 195
Reserve Study for the Community Center
March 12, 2024
FISCAL IMPACT:
The results of the reserve study indicate that the City should be budgeting approximately $500,000 per year to fund future capital improvement projects at the Laguna Hills Community Center.
ATTACHMENTS:
• Directed Cash Flow Chart
• Community Center Reserve Study Report
4.8 Packet Pg. 196
Alternative Level Payment Funding Option
Fully
Fiscal Member Interest Ending Funded
Year Contribution Contribution Expenses Balance Balance Beginning Balance Contribution Expenses Ending Balance 2023-24 $474,500 $2,100 $147,270 $329,330 $5,036,231 7% $ - $ 500,000.00 $ 147,270.00 $ 352,730.00 2024-25 $488,735 $4,205 $413,883 $408,387 $5,084,022 8% $ 352,730.00 $ 500,000.00 $ 413,883.00 $ 438,847.00 2025-26 $503,397 $13,625 $189,905 $735,503 $5,381,473 14% $ 438,847.00 $ 500,000.00 $ 189,905.00 $ 748,942.00 2026-27 $518,499 $29,560 $0 $1,283,562 $5,899,709 22% $ 748,942.00 $ 500,000.00 $ - $ 1,248,942.00 2027-28 $534,054 $26,525 $654,931 $1,189,210 $5,749,906 21% $ 1,248,942.00 $ 500,000.00 $ 654,931.00 $ 1,094,011.00 2028-29 $550,076 $40,259 $116,345 $1,663,200 $6,178,893 27% $ 1,094,011.00 $ 500,000.00 $ 116,345.00 $ 1,477,666.00 2029-30 $566,578 $57,669 $25,481 $2,261,965 $6,728,543 34% $ 1,477,666.00 $ 500,000.00 $ 25,481.00 $ 1,952,185.00 2030-31 $583,575 $70,563 $208,070 $2,708,033 $7,112,715 38% $ 1,952,185.00 $ 500,000.00 $ 208,070.00 $ 2,244,115.00 2031-32 $601,082 $90,702 $0 $3,399,817 $7,741,244 44% $ 2,244,115.00 $ 500,000.00 $ - $ 2,744,115.00 2032-33 $619,115 $0 $4,006,276 $2,795 $4,150,827 0% $ 2,744,115.00 $ 500,000.00 $ 4,006,276.00 $ (762,161.00) 2033-34 $637,688 $4,542 $144,162 $500,863 $4,562,841 11% $ (762,161.00) $ 500,000.00 $ 144,162.00 $ (406,323.00) 2034-35 $656,819 $14,917 $309,830 $862,769 $4,824,671 18% $ (406,323.00) $ 500,000.00 $ 309,830.00 $ (216,153.00) 2035-36 $676,524 $28,944 $219,573 $1,348,663 $5,203,719 26% $ (216,153.00) $ 500,000.00 $ 219,573.00 $ 64,274.00 2036-37 $696,819 $27,098 $775,386 $1,297,195 $5,018,494 26% $ 64,274.00 $ 500,000.00 $ 775,386.00 $ (211,112.00) 2037-38 $717,724 $25,313 $792,128 $1,248,104 $4,824,389 26% $ (211,112.00) $ 500,000.00 $ 792,128.00 $ (503,240.00) 2038-39 $739,256 $48,212 $0 $2,035,572 $5,479,700 37% $ (503,240.00) $ 500,000.00 $ - $ (3,240.00) 2039-40 $761,433 $71,430 $34,244 $2,834,190 $6,133,659 46% $ (3,240.00) $ 500,000.00 $ 34,244.00 $ 462,516.00 2040-41 $784,276 $87,543 $313,512 $3,392,497 $6,526,738 52% $ 462,516.00 $ 500,000.00 $ 313,512.00 $ 649,004.00 2041-42 $807,804 $111,558 $92,995 $4,218,864 $7,181,805 59% $ 649,004.00 $ 500,000.00 $ 92,995.00 $ 1,056,009.00 2042-43 $832,039 $97,365 $1,397,050 $3,751,218 $6,489,792 58% $ 1,056,009.00 $ 500,000.00 $ 1,397,050.00 $ 158,959.00 2043-44 $857,000 $86,088 $1,311,526 $3,382,780 $5,885,649 57% $ 158,959.00 $ 500,000.00 $ 1,311,526.00 $ (652,567.00) 2044-45 $882,710 $97,938 $565,210 $3,798,218 $6,072,925 63% $ (652,567.00) $ 500,000.00 $ 565,210.00 $ (717,777.00) 2045-46 $909,191 $119,157 $295,088 $4,531,479 $6,570,702 69% $ (717,777.00) $ 500,000.00 $ 295,088.00 $ (512,865.00) 2046-47 $936,467 $123,789 $888,509 $4,703,226 $6,472,712 73% $ (512,865.00) $ 500,000.00 $ 888,509.00 $ (901,374.00) 2047-48 $964,561 $152,965 $113,836 $5,706,915 $7,213,056 79% $ (901,374.00) $ 500,000.00 $ 113,836.00 $ (515,210.00) 2048-49 $993,498 $187,356 $0 $6,887,769 $8,116,388 85% $ (515,210.00) $ 500,000.00 $ - $ (15,210.00) 2049-50 $1,023,303 $222,287 $46,022 $8,087,336 $9,018,604 90% $ (15,210.00) $ 500,000.00 $ 46,022.00 $ 438,768.00 2050-51 $1,054,002 $249,168 $375,798 $9,014,708 $9,619,254 94% $ 438,768.00 $ 500,000.00 $ 375,798.00 $ 562,970.00 2051-52 $1,085,622 $289,243 $0 $10,389,573 $10,658,470 97% $ 562,970.00 $ 500,000.00 $ - $ 1,062,970.00 2052-53 $1,118,190 $248,994 $2,713,015 $9,043,742 $8,873,144 102% $ 1,062,970.00 $ 500,000.00 $ 2,713,015.00 $ (1,150,045.00) Average Annual Ending Balance $ 339,658.20
$5,706,915
$6,887,769
$8,087,336
$9,014,708
$10,389,573
$3,751,218
$3,382,780
$3,798,218
$4,531,479
$4,703,226
$1,248,104
$2,035,572
$2,834,190
$3,392,497
$4,218,864
$3,399,817
$2,795
$500,863
$862,769
$1,348,663
$1,297,195
$1,189,210
$1,663,200
$2,261,965
$2,708,033
Balance Funded
$0
$329,330
$408,387
$735,503
$1,283,562
Laguna Hills Community Center
Projections
Directed Cash Flow Method from Reserve Study
Beginning Percent
4.8.a
Packet Pg. 197 Attachment: Directed Cash Flow Chart (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Laguna Hills, California
Version 1
November 8, 2023
Advanced Reserve Solutions, Inc.
23201 Mill Creek Drive, Suite 210
Laguna Hills, California 92653
Phone (949) 474-9800
Facsimile (949) 474-9820
RESERVE ANALYSIS REPORT
© 1997 - 2023
Advanced Reserve Solutions, Inc.
All Rights Reserved.
4.8.b
Packet Pg. 198 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Table Of Contents
Page
Preface i
Executive Summary 1
Disclosure Statement 2
Photo Library 3
Cross-Tabular Summary 8
Calculation of Percent Funded 14
Management Summary 16
Management Charts 18
Annual Expenditures 20
Projections 24
Projection Charts 25
Component Detail 27
Component Detail Index 77
4.8.b
Packet Pg. 199 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) i Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 200 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) ii Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 201 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) iii Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 202 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) iv Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 203 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) v Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 204 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) vi Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 205 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) vii Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 206 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) viii Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 207 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) ix Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 208 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) x Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 209 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) xi Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 210 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) xii Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 211 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) xiii Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 212 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) Laguna Hills Community Center
Preface
11.8.2023(1) xiv Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 213 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 1 Laguna Hills Community Center
Executive Summary
Directed Cash Flow Method
Account Number 12692
Version Number 1
Analysis Date 11/8/2023
Fiscal Year 7/1/2023 to 6/30/2024
Number of facility 1
Client Information Global Parameters
Inflation Rate 3.00%
Annual Contribution Increase 3.00%
Investment Rate 3.00%
Taxes on Investments 0.00%
Contingency 3.00%
$474,500 $39,541.67
Total Contribution $476,600 $39,716.64
Interest Contribution $2,100 $174.97
$39,541.67
$174.97
$39,716.64
Member Contribution
Funding for the 2023-24 Fiscal Year
Per facility
The Laguna Hills Community Center consists of a 42,000 sq. ft. building that houses the City's Community Services Department. The building contains a large gymnasium, dance studio, large ballroom with stage, commercial kitchen, classrooms, offices, tower meeting room, restrooms/locker rooms, PC room (operated by the library) parking lot and outdoor patio with elaborate water gardens.
For budgeting purposes, we have used July 2002 as the placed-in-service date for aging the original components throughout this analysis.
At the request of the client, we have included only those reserve components with a replacement cost of $20,000 or greater in this analysis.
ARS site visits conducted: October 25, 2023 & March 27, 2008 Community Profile
Annual Monthly Per Month
Adequacy of Reserves as of July 1, 2023
Anticipated Reserve Balance $0.00
Fully Funded Reserve Balance $4,733,032.41
Percent Funded 0.00%
Deficit per facility $4,733,032.41
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 214 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 2 Laguna Hills Community Center
Preparer's Disclosure Statement
In August 1998, Richard Ruffell was awarded the Reserve Specialist (RS) designation from Community Associations Institute (CAI). Mr. Ruffell was the twelfth person in the United States to receive this professional designation.
The RS designation was developed by CAI for professional reserve analysts who wish to confirm to their peers and/or clients that they have demonstrated a basic level of competency within the industry. The RS designation is awarded to reserve analysts who are dedicated to the highest standards of professionalism and reserve analysis preparation.
Consultant certifies that:
1) Consultant has no other involvement with association which could result in actual or perceived conflicts of interest. 2) Consultant made site visits of community on October 26, 2023 & March 27, 2008. Component inventories were developed by actual field inventory, representative sampling, take-offs of scaled plans, provided by the association's previous reserve analysis prepared by another firm or provided by the association.
Component conditional assessments were developed by actual field observation and representative sampling. 3) Financial assumptions used in this analysis are listed on the Executive Summary and further explained in the Preface of this report.
4) Consultant is a Reserve Specialist (RS) designee.
5) There are no material issues known to consultant at this time which would cause a distortion of the association's situation.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 215 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 3 Laguna Hills Community Center
Photo Library
Building Exterior Courtyard Water Feature
Built up Roof Built up Roof
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 216 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 4 Laguna Hills Community Center
Photo Library
HVAC Systems Entry Lobby
Gymnasium Kitchen
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 217 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 5 Laguna Hills Community Center
Photo Library
Restrooms Boiler
Ballroom Fire Control Panel
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 218 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 6 Laguna Hills Community Center
Photo Library
Restrooms Battery Backup
Building Exterior Walkway Lighting
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 219 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 7 Laguna Hills Community Center
Photo Library
Building Interior Elevator
Building Interior Ballroom
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 220 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 8 Cross-Tabular Summary
Laguna Hills Community Center
Directed Cash Flow Method; Sorted by Category
2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 BEGINNING RESERVE BALANCE $0 $329,330 $408,387 $735,503 $1,283,562 $1,189,210 $1,663,200 $2,261,965 $2,708,033 $3,399,817 Member Contribution $474,500 $488,735 $503,397 $518,499 $534,054 $550,076 $566,578 $583,575 $601,082 $619,115 Interest Contribution $2,100 $4,205 $13,625 $29,560 $26,525 $40,259 $57,669 $70,563 $90,702 $0 Expenditures (detailed below) $147,270 $413,883 $189,905 $0 $654,931 $116,345 $25,481 $208,070 $0 $4,006,276 ENDING RESERVE BALANCE $329,330 $408,387 $735,503 $1,283,562 $1,189,210 $1,663,200 $2,261,965 $2,708,033 $3,399,817 $2,795 Concrete - Mastic, Unfunded
Concrete - Replacement
Streets - Asphalt, Major Rehab $98,956
Streets - Asphalt, Repair/Seal & Stripe $21,980 $25,481 Roofs - Built Up, Coating, 2020 $158,875
Roofs - Built Up, Coating, 2024 $107,270
Roofs - Built Up, Replacement
Roofs - Glass $42,207
Roofs - Skylights $40,000
Roofs - Tile
Painting - Exterior $91,850
Painting - Interior $163,383
Fencing - Metal
Walls - Masonry
Lighting - Exterior, Building
Lighting - Exterior, Grounds, Newer
Lighting - Exterior, Grounds, Original $141,814
Lighting - Interior
Building Interior - Cabinets/Counters $326,063
Building Interior - Ceiling Panels $66,870
Building Interior - Drinking Fountains, 2022
Building Interior - Drinking Fountains, Original $27,012 Building Interior - Floor, Carpet $116,712
Building Interior - Floor, Ceramic Tile $445,441
Building Interior - Floor, Vinyl Tile $53,211
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 221 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 9 Cross-Tabular Summary
Laguna Hills Community Center
Directed Cash Flow Method; Sorted by Category
2033-34 2034-35 2035-36 2036-37 2037-38 2038-39 2039-40 2040-41 2041-42 2042-43 BEGINNING RESERVE BALANCE $2,795 $500,863 $862,769 $1,348,663 $1,297,195 $1,248,104 $2,035,572 $2,834,190 $3,392,497 $4,218,864 Member Contribution $637,688 $656,819 $676,524 $696,819 $717,724 $739,256 $761,433 $784,276 $807,804 $832,039 Interest Contribution $4,542 $14,917 $28,944 $27,098 $25,313 $48,212 $71,430 $87,543 $111,558 $97,365 Expenditures (detailed below) $144,162 $309,830 $219,573 $775,386 $792,128 $0 $34,244 $313,512 $92,995 $1,397,050 ENDING RESERVE BALANCE $500,863 $862,769 $1,348,663 $1,297,195 $1,248,104 $2,035,572 $2,834,190 $3,392,497 $4,218,864 $3,751,218 Concrete - Mastic, Unfunded
Concrete - Replacement $1,397,050
Streets - Asphalt, Major Rehab
Streets - Asphalt, Repair/Seal & Stripe $29,540 $34,244 Roofs - Built Up, Coating, 2020 $213,515
Roofs - Built Up, Coating, 2024 $144,162
Roofs - Built Up, Replacement
Roofs - Glass
Roofs - Skylights
Roofs - Tile
Painting - Exterior $123,439
Painting - Interior $219,573
Fencing - Metal $241,213
Walls - Masonry $354,279
Lighting - Exterior, Building $50,435
Lighting - Exterior, Grounds, Newer $33,883
Lighting - Exterior, Grounds, Original
Lighting - Interior
Building Interior - Cabinets/Counters
Building Interior - Ceiling Panels
Building Interior - Drinking Fountains, 2022
Building Interior - Drinking Fountains, Original
Building Interior - Floor, Carpet $156,852
Building Interior - Floor, Ceramic Tile
Building Interior - Floor, Vinyl Tile
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 222 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 10 Cross-Tabular Summary
Laguna Hills Community Center
Directed Cash Flow Method; Sorted by Category
2043-44 2044-45 2045-46 2046-47 2047-48 2048-49 2049-50 2050-51 2051-52 2052-53 BEGINNING RESERVE BALANCE $3,751,218 $3,382,780 $3,798,218 $4,531,479 $4,703,226 $5,706,915 $6,887,769 $8,087,336 $9,014,708 $10,389,573 Member Contribution $857,000 $882,710 $909,191 $936,467 $964,561 $993,498 $1,023,303 $1,054,002 $1,085,622 $1,118,190 Interest Contribution $86,088 $97,938 $119,157 $123,789 $152,965 $187,356 $222,287 $249,168 $289,243 $248,994 Expenditures (detailed below) $1,311,526 $565,210 $295,088 $888,509 $113,836 $0 $46,022 $375,798 $0 $2,713,015 ENDING RESERVE BALANCE $3,382,780 $3,798,218 $4,531,479 $4,703,226 $5,706,915 $6,887,769 $8,087,336 $9,014,708 $10,389,573 $9,043,742 Concrete - Mastic, Unfunded
Concrete - Replacement
Streets - Asphalt, Major Rehab $201,156
Streets - Asphalt, Repair/Seal & Stripe $39,699 $46,022 Roofs - Built Up, Coating, 2020 $286,946
Roofs - Built Up, Coating, 2024 $193,742
Roofs - Built Up, Replacement $427,055
Roofs - Glass $88,371
Roofs - Skylights $72,244
Roofs - Tile $591,393
Painting - Exterior $165,892
Painting - Interior $295,088
Fencing - Metal
Walls - Masonry
Lighting - Exterior, Building
Lighting - Exterior, Grounds, Newer
Lighting - Exterior, Grounds, Original $296,927
Lighting - Interior $695,097
Building Interior - Cabinets/Counters
Building Interior - Ceiling Panels
Building Interior - Drinking Fountains, 2022 $24,394
Building Interior - Drinking Fountains, Original $56,558 Building Interior - Floor, Carpet $210,796
Building Interior - Floor, Ceramic Tile
Building Interior - Floor, Vinyl Tile $111,411
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 223 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 11 Cross-Tabular Summary
Laguna Hills Community Center
Directed Cash Flow Method; Sorted by Category
2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 BEGINNING RESERVE BALANCE $0 $329,330 $408,387 $735,503 $1,283,562 $1,189,210 $1,663,200 $2,261,965 $2,708,033 $3,399,817 Member Contribution $474,500 $488,735 $503,397 $518,499 $534,054 $550,076 $566,578 $583,575 $601,082 $619,115 Interest Contribution $2,100 $4,205 $13,625 $29,560 $26,525 $40,259 $57,669 $70,563 $90,702 $0 Expenditures (detailed below) $147,270 $413,883 $189,905 $0 $654,931 $116,345 $25,481 $208,070 $0 $4,006,276 ENDING RESERVE BALANCE $329,330 $408,387 $735,503 $1,283,562 $1,189,210 $1,663,200 $2,261,965 $2,708,033 $3,399,817 $2,795 Building Interior - Floor, Wood $888,436
Building Interior - Furniture, Unfunded
Building Interior - Gym, Basketball Backboards $97,858
Building Interior - Gym, Bleachers
Building Interior - Kitchen Equipment $82,400
Building Interior - Restroom Remodel, Floor 1 $670,275
Building Interior - Restroom Remodel, Floor 2 $116,725
Building Interior - Room Partitions $100,940
Building Interior - Wall, Ceramic Tile $309,558
Building Interior - Wall, Wallpaper $51,904
Building Interior - Window Blinds $91,622
Building Exterior - Doors $213,330
Equipment - Audio/Video $89,028
Equipment - Back Up, Power Supply $67,531
Equipment - Electronic/Office, Unfunded
Equipment - Elevator, Cab Refurbishing $17,389
Equipment - Elevator, Modernization $326,193
Equipment - Fire Control Panels $41,081
Equipment - HVAC, Boilers $26,523
Equipment - HVAC, Heaters $67,848
Equipment - HVAC, Package Units
Equipment - HVAC, Ventilation Fans $49,522
Equipment - Surveillance System $49,195
Grounds - Fountain, Refurbish $326,193
Grounds - Park Furnishings $151,484
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 224 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 12 Cross-Tabular Summary
Laguna Hills Community Center
Directed Cash Flow Method; Sorted by Category
2033-34 2034-35 2035-36 2036-37 2037-38 2038-39 2039-40 2040-41 2041-42 2042-43 BEGINNING RESERVE BALANCE $2,795 $500,863 $862,769 $1,348,663 $1,297,195 $1,248,104 $2,035,572 $2,834,190 $3,392,497 $4,218,864 Member Contribution $637,688 $656,819 $676,524 $696,819 $717,724 $739,256 $761,433 $784,276 $807,804 $832,039 Interest Contribution $4,542 $14,917 $28,944 $27,098 $25,313 $48,212 $71,430 $87,543 $111,558 $97,365 Expenditures (detailed below) $144,162 $309,830 $219,573 $775,386 $792,128 $0 $34,244 $313,512 $92,995 $1,397,050 ENDING RESERVE BALANCE $500,863 $862,769 $1,348,663 $1,297,195 $1,248,104 $2,035,572 $2,834,190 $3,392,497 $4,218,864 $3,751,218 Building Interior - Floor, Wood
Building Interior - Furniture, Unfunded
Building Interior - Gym, Basketball Backboards
Building Interior - Gym, Bleachers $196,637
Building Interior - Kitchen Equipment
Building Interior - Restroom Remodel, Floor 1
Building Interior - Restroom Remodel, Floor 2
Building Interior - Room Partitions
Building Interior - Wall, Ceramic Tile
Building Interior - Wall, Wallpaper
Building Interior - Window Blinds
Building Exterior - Doors
Equipment - Audio/Video
Equipment - Back Up, Power Supply
Equipment - Electronic/Office, Unfunded
Equipment - Elevator, Cab Refurbishing
Equipment - Elevator, Modernization
Equipment - Fire Control Panels
Equipment - HVAC, Boilers $42,561
Equipment - HVAC, Heaters
Equipment - HVAC, Package Units $775,386
Equipment - HVAC, Ventilation Fans
Equipment - Surveillance System $66,114
Grounds - Fountain, Refurbish
Grounds - Park Furnishings
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 225 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 13 Cross-Tabular Summary
Laguna Hills Community Center
Directed Cash Flow Method; Sorted by Category
2043-44 2044-45 2045-46 2046-47 2047-48 2048-49 2049-50 2050-51 2051-52 2052-53 BEGINNING RESERVE BALANCE $3,751,218 $3,382,780 $3,798,218 $4,531,479 $4,703,226 $5,706,915 $6,887,769 $8,087,336 $9,014,708 $10,389,573 Member Contribution $857,000 $882,710 $909,191 $936,467 $964,561 $993,498 $1,023,303 $1,054,002 $1,085,622 $1,118,190 Interest Contribution $86,088 $97,938 $119,157 $123,789 $152,965 $187,356 $222,287 $249,168 $289,243 $248,994 Expenditures (detailed below) $1,311,526 $565,210 $295,088 $888,509 $113,836 $0 $46,022 $375,798 $0 $2,713,015 ENDING RESERVE BALANCE $3,382,780 $3,798,218 $4,531,479 $4,703,226 $5,706,915 $6,887,769 $8,087,336 $9,014,708 $10,389,573 $9,043,742 Building Interior - Floor, Wood
Building Interior - Furniture, Unfunded
Building Interior - Gym, Basketball Backboards
Building Interior - Gym, Bleachers
Building Interior - Kitchen Equipment $148,824
Building Interior - Restroom Remodel, Floor 1
Building Interior - Restroom Remodel, Floor 2
Building Interior - Room Partitions $193,411
Building Interior - Wall, Ceramic Tile
Building Interior - Wall, Wallpaper $108,675
Building Interior - Window Blinds $191,836
Building Exterior - Doors
Equipment - Audio/Video $186,404
Equipment - Back Up, Power Supply $141,394
Equipment - Electronic/Office, Unfunded
Equipment - Elevator, Cab Refurbishing $27,092
Equipment - Elevator, Modernization
Equipment - Fire Control Panels $86,015
Equipment - HVAC, Boilers
Equipment - HVAC, Heaters
Equipment - HVAC, Package Units $1,244,267
Equipment - HVAC, Ventilation Fans $89,443
Equipment - Surveillance System $88,852
Grounds - Fountain, Refurbish
Grounds - Park Furnishings
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 226 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 14 Laguna Hills Community Center
Calculation of Percent Funded
Sorted by Category; Alphabetical
Remaining
Life
Useful
Life
Current
Cost
Fully
Funded
Balance
010 Asphalt & Concrete
Concrete - Mastic, Unfunded n.a. n.a. $0.00 $0.00
Concrete - Replacement 19 40 $796,718.00 $418,276.95
Streets - Asphalt, Major Rehab 5 24 $85,360.00 $68,944.62 Streets - Asphalt, Repair/Seal & Stripe 1 5 $21,340.00 $19,917.33 Sub Total 1-19 5-40 $903,418.00 $507,138.90
020 Roofs
Roofs - Built Up, Coating, 2020 7 10 $129,180.00 $38,754.00 Roofs - Built Up, Coating, 2024 0 10 $107,270.00 $107,270.00 Roofs - Built Up, Replacement 20 40 $236,450.00 $121,108.54 Roofs - Glass 4 25 $37,500.00 $31,500.00
Roofs - Skylights 0 20 $40,000.00 $40,000.00
Roofs - Tile 20 40 $327,440.00 $167,713.17
Sub Total 0-20 10-40 $877,840.00 $506,345.71
030 Painting
Painting - Exterior 1 10 $89,175.00 $85,121.59
Painting - Interior 2 10 $154,004.00 $123,203.20
Sub Total 1-2 10 $243,179.00 $208,324.79
040 Fencing/Walls
Fencing - Metal 14 35 $159,470.00 $95,682.00
Walls - Masonry 14 35 $234,220.00 $140,532.00
Sub Total 14 35 $393,690.00 $236,214.00
050 Lighting
Lighting - Exterior, Building 18 20 $29,625.00 $2,962.50 Lighting - Exterior, Grounds, Newer 17 20 $20,500.00 $3,075.00 Lighting - Exterior, Grounds, Original 4 25 $126,000.00 $105,840.00 Lighting - Interior 23 25 $352,200.00 $28,176.00
Sub Total 4-23 20-25 $528,325.00 $140,053.50
070 Building Interior
Building Interior - Cabinets/Counters 9 30 $249,900.00 $174,930.00 Building Interior - Ceiling Panels 9 30 $51,250.50 $35,875.35 Building Interior - Drinking Fountains, 2022 24 25 $12,000.00 $480.00 Building Interior - Drinking Fountains, Original 4 25 $24,000.00 $20,160.00 Building Interior - Floor, Carpet 1 10 $113,313.00 $101,981.70 Building Interior - Floor, Ceramic Tile 9 30 $341,393.50 $238,975.45 Building Interior - Floor, Vinyl Tile 4 25 $47,277.00 $39,712.68 Building Interior - Floor, Wood 9 30 $680,912.40 $476,638.68
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 227 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 15 Laguna Hills Community Center
Calculation of Percent Funded
Sorted by Category; Alphabetical
Total $4,733,032.41
Anticipated Reserve Balance $0.00
Percent Funded 0.00%
Remaining
Life
Useful
Life
Current
Cost
Fully
Funded
Balance
Building Interior - Furniture, Unfunded n.a. n.a. $0.00 $0.00 Building Interior - Gym, Basketball Backboards 9 30 $75,000.00 $52,500.00 Building Interior - Gym, Bleachers 14 35 $130,000.00 $78,000.00 Building Interior - Kitchen Equipment 1 20 $80,000.00 $76,363.64 Building Interior - Restroom Remodel, Floor 1 9 30 $513,710.00 $359,597.00 Building Interior - Restroom Remodel, Floor 2 9 30 $89,460.00 $62,622.00 Building Interior - Room Partitions 1 22 $98,000.00 $93,545.45 Building Interior - Wall, Ceramic Tile 9 30 $237,250.20 $166,075.14 Building Interior - Wall, Wallpaper 4 25 $46,116.00 $38,737.44 Building Interior - Window Blinds 4 25 $81,405.00 $68,380.20 Sub Total 1-24 10-35 $2,870,987.60 $2,084,574.73
080 Building Exterior
Building Exterior - Doors 9 30 $163,500.00 $114,450.00
Sub Total 9 30 $163,500.00 $114,450.00
090 Equipment
Equipment - Audio/Video 4 25 $79,100.00 $66,444.00
Equipment - Back Up, Power Supply 4 25 $60,000.00 $50,400.00 Equipment - Electronic/Office, Unfunded n.a. n.a. $0.00 $0.00 Equipment - Elevator, Cab Refurbishing 5 15 $15,000.00 $12,115.38 Equipment - Elevator, Modernization 9 30 $250,000.00 $175,000.00 Equipment - Fire Control Panels 4 25 $36,500.00 $30,660.00 Equipment - HVAC, Boilers 2 16 $25,000.00 $22,826.09
Equipment - HVAC, Heaters 9 30 $52,000.00 $36,400.00
Equipment - HVAC, Package Units 13 16 $528,000.00 $99,000.00 Equipment - HVAC, Ventilation Fans 4 20 $44,000.00 $36,960.00 Equipment - Surveillance System 7 10 $40,000.00 $12,000.00 Sub Total 2-13 10-30 $1,129,600.00 $541,805.47
100 Grounds
Grounds - Fountain, Refurbish 9 30 $250,000.00 $175,000.00 Grounds - Park Furnishings 9 30 $116,100.00 $81,270.00
Sub Total 9 30 $366,100.00 $256,270.00
Contingency n.a. n.a. n.a. $137,855.31
Total 0-24 5-40 $7,476,639.60 $4,733,032.41
Anticipated Reserve Balance $0.00
Percent Funded 0.00%
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 228 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 16 Laguna Hills Community Center
Management Summary
Directed Cash Flow Method; Sorted by Category
Balance at
Beginning
of Year
Monthly
Member
Contribution
Monthly
Interest
Contribution
Total
Monthly
Contribution
010 Asphalt & Concrete
Concrete - Mastic, Unfunded $0.00 $0.00 $0.00 $0.00
Concrete - Replacement $0.00 $1,336.08 $5.91 $1,341.99
Streets - Asphalt, Major Rehab $0.00 $545.50 $2.41 $547.91 Streets - Asphalt, Repair/Seal & Stripe $0.00 $682.43 $3.02 $685.45 Sub Total $0.00 $2,564.01 $11.35 $2,575.36
020 Roofs
Roofs - Built Up, Coating, 2020 $0.00 $589.43 $2.61 $592.04 Roofs - Built Up, Coating, 2024 $0.00 $342.41 $1.52 $343.93 Roofs - Built Up, Replacement $0.00 $376.62 $1.67 $378.29 Roofs - Glass $0.00 $299.62 $1.33 $300.95
Roofs - Skylights $0.00 $63.71 $0.28 $63.99
Roofs - Tile $0.00 $521.55 $2.31 $523.86
Sub Total $0.00 $2,193.35 $9.71 $2,203.05
030 Painting
Painting - Exterior $0.00 $2,851.70 $12.62 $2,864.32
Painting - Interior $0.00 $2,461.93 $10.89 $2,472.82
Sub Total $0.00 $5,313.63 $23.51 $5,337.15
040 Fencing/Walls
Fencing - Metal $0.00 $363.31 $1.61 $364.91
Walls - Masonry $0.00 $533.60 $2.36 $535.96
Sub Total $0.00 $896.91 $3.97 $900.88
050 Lighting
Lighting - Exterior, Building $0.00 $52.45 $0.23 $52.68 Lighting - Exterior, Grounds, Newer $0.00 $38.44 $0.17 $38.61 Lighting - Exterior, Grounds, Original $0.00 $1,006.72 $4.45 $1,011.18 Lighting - Interior $0.00 $487.52 $2.16 $489.68
Sub Total $0.00 $1,585.13 $7.01 $1,592.14
070 Building Interior
Building Interior - Cabinets/Counters $0.00 $886.51 $3.92 $890.43 Building Interior - Ceiling Panels $0.00 $181.81 $0.80 $182.61 Building Interior - Drinking Fountains, 2022 $0.00 $15.92 $0.07 $15.99 Building Interior - Drinking Fountains, Original $0.00 $191.76 $0.85 $192.60 Building Interior - Floor, Carpet $0.00 $3,623.61 $16.03 $3,639.64 Building Interior - Floor, Ceramic Tile $0.00 $1,211.08 $5.36 $1,216.44 Building Interior - Floor, Vinyl Tile $0.00 $377.74 $1.67 $379.41 Building Interior - Floor, Wood $0.00 $2,415.51 $10.69 $2,426.20
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 229 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 17 Laguna Hills Community Center
Management Summary
Directed Cash Flow Method; Sorted by Category
Balance at
Beginning
of Year
Monthly
Member
Contribution
Monthly
Interest
Contribution
Total
Monthly
Contribution
Building Interior - Furniture, Unfunded $0.00 $0.00 $0.00 $0.00 Building Interior - Gym, Basketball Backboards $0.00 $266.06 $1.18 $267.24 Building Interior - Gym, Bleachers $0.00 $296.17 $1.31 $297.48 Building Interior - Kitchen Equipment $0.00 $2,558.30 $11.32 $2,569.62 Building Interior - Restroom Remodel, Floor 1 $0.00 $1,822.36 $8.06 $1,830.43 Building Interior - Restroom Remodel, Floor 2 $0.00 $317.36 $1.40 $318.76 Building Interior - Room Partitions $0.00 $3,133.92 $13.87 $3,147.78 Building Interior - Wall, Ceramic Tile $0.00 $841.64 $3.72 $845.36 Building Interior - Wall, Wallpaper $0.00 $368.46 $1.63 $370.09 Building Interior - Window Blinds $0.00 $650.41 $2.88 $653.29 Sub Total $0.00 $19,158.59 $84.78 $19,243.37
080 Building Exterior
Building Exterior - Doors $0.00 $580.01 $2.57 $582.58
Sub Total $0.00 $580.01 $2.57 $582.58
090 Equipment
Equipment - Audio/Video $0.00 $632.00 $2.80 $634.79
Equipment - Back Up, Power Supply $0.00 $479.39 $2.12 $481.51 Equipment - Electronic/Office, Unfunded $0.00 $0.00 $0.00 $0.00 Equipment - Elevator, Cab Refurbishing $0.00 $95.86 $0.42 $96.28 Equipment - Elevator, Modernization $0.00 $886.86 $3.92 $890.79 Equipment - Fire Control Panels $0.00 $291.63 $1.29 $292.92 Equipment - HVAC, Boilers $0.00 $399.65 $1.77 $401.42
Equipment - HVAC, Heaters $0.00 $184.47 $0.82 $185.28
Equipment - HVAC, Package Units $0.00 $1,295.68 $5.73 $1,301.42 Equipment - HVAC, Ventilation Fans $0.00 $351.55 $1.56 $353.11 Equipment - Surveillance System $0.00 $182.51 $0.81 $183.32 Sub Total $0.00 $4,799.61 $21.24 $4,820.85
100 Grounds
Grounds - Fountain, Refurbish $0.00 $886.86 $3.92 $890.79 Grounds - Park Furnishings $0.00 $411.86 $1.82 $413.68
Sub Total $0.00 $1,298.72 $5.75 $1,304.47
Total $0.00 $39,541.67 $174.97 $39,716.64
Contingency $0.00 $1,151.70 $5.10 $1,156.80
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 230 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 18 Laguna Hills Community Center
Management / Accounting Charts
Directed Cash Flow Method; Sorted by Category
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 231 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 19 Laguna Hills Community Center
Management / Accounting Charts
Directed Cash Flow Method; Sorted by Category
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 232 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 20 Laguna Hills Community Center
Annual Expenditures
Sorted by Alphabetical
2023-24 Fiscal Year
Roofs - Built Up, Coating, 2024 $107,270.00
Roofs - Skylights $40,000.00
Sub Total $147,270.00
2024-25 Fiscal Year
Building Interior - Floor, Carpet $116,712.39
Building Interior - Kitchen Equipment $82,400.00
Building Interior - Room Partitions $100,940.00
Painting - Exterior $91,850.25
Streets - Asphalt, Repair/Seal & Stripe $21,980.20
Sub Total $413,882.84
2025-26 Fiscal Year
Equipment - HVAC, Boilers $26,522.50
Painting - Interior $163,382.84
Sub Total $189,905.34
2027-28 Fiscal Year
Building Interior - Drinking Fountains, Original $27,012.21 Building Interior - Floor, Vinyl Tile $53,210.68
Building Interior - Wall, Wallpaper $51,903.96
Building Interior - Window Blinds $91,622.04
Equipment - Audio/Video $89,027.75
Equipment - Back Up, Power Supply $67,530.53
Equipment - Fire Control Panels $41,081.07
Equipment - HVAC, Ventilation Fans $49,522.39
Lighting - Exterior, Grounds, Original $141,814.11
Roofs - Glass $42,206.58
Sub Total $654,931.33
2028-29 Fiscal Year
Equipment - Elevator, Cab Refurbishing $17,389.11
Streets - Asphalt, Major Rehab $98,955.64
Sub Total $116,344.75
2029-30 Fiscal Year
Streets - Asphalt, Repair/Seal & Stripe $25,481.08
Sub Total $25,481.08
2030-31 Fiscal Year
Equipment - Surveillance System $49,194.95
Roofs - Built Up, Coating, 2020 $158,875.11
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 233 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 21 Laguna Hills Community Center
Annual Expenditures
Sorted by Alphabetical
Sub Total $208,070.06
2032-33 Fiscal Year
Building Exterior - Doors $213,330.42
Building Interior - Cabinets/Counters $326,062.82
Building Interior - Ceiling Panels $66,870.28
Building Interior - Floor, Ceramic Tile $445,441.08
Building Interior - Floor, Wood $888,436.24
Building Interior - Gym, Basketball Backboards $97,857.99 Building Interior - Restroom Remodel, Floor 1 $670,275.03 Building Interior - Restroom Remodel, Floor 2 $116,725.01 Building Interior - Wall, Ceramic Tile $309,557.70
Equipment - Elevator, Modernization $326,193.30
Equipment - HVAC, Heaters $67,848.21
Grounds - Fountain, Refurbish $326,193.30
Grounds - Park Furnishings $151,484.17
Sub Total $4,006,275.53
2033-34 Fiscal Year
Roofs - Built Up, Coating, 2024 $144,161.91
Sub Total $144,161.91
2034-35 Fiscal Year
Building Interior - Floor, Carpet $156,851.69
Painting - Exterior $123,439.06
Streets - Asphalt, Repair/Seal & Stripe $29,539.55
Sub Total $309,830.30
2035-36 Fiscal Year
Painting - Interior $219,572.88
Sub Total $219,572.88
2036-37 Fiscal Year
Equipment - HVAC, Package Units $775,385.80
Sub Total $775,385.80
2037-38 Fiscal Year
Building Interior - Gym, Bleachers $196,636.66
Fencing - Metal $241,212.68
Walls - Masonry $354,278.77
Sub Total $792,128.11
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 234 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 22 Laguna Hills Community Center
Annual Expenditures
Sorted by Alphabetical
2039-40 Fiscal Year
Streets - Asphalt, Repair/Seal & Stripe $34,244.44
Sub Total $34,244.44
2040-41 Fiscal Year
Equipment - Surveillance System $66,113.91
Lighting - Exterior, Grounds, Newer $33,883.38
Roofs - Built Up, Coating, 2020 $213,514.86
Sub Total $313,512.14
2041-42 Fiscal Year
Equipment - HVAC, Boilers $42,560.83
Lighting - Exterior, Building $50,434.58
Sub Total $92,995.41
2042-43 Fiscal Year
Concrete - Replacement $1,397,049.84
Sub Total $1,397,049.84
2043-44 Fiscal Year
Equipment - Elevator, Cab Refurbishing $27,091.67
Roofs - Built Up, Coating, 2024 $193,741.55
Roofs - Built Up, Replacement $427,055.00
Roofs - Skylights $72,244.45
Roofs - Tile $591,393.06
Sub Total $1,311,525.73
2044-45 Fiscal Year
Building Interior - Floor, Carpet $210,795.56
Building Interior - Kitchen Equipment $148,823.57
Painting - Exterior $165,891.77
Streets - Asphalt, Repair/Seal & Stripe $39,698.69
Sub Total $565,209.58
2045-46 Fiscal Year
Painting - Interior $295,087.59
Sub Total $295,087.59
2046-47 Fiscal Year
Building Interior - Room Partitions $193,411.48
Lighting - Interior $695,097.17
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 235 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 23 Laguna Hills Community Center
Annual Expenditures
Sorted by Alphabetical
Sub Total $888,508.65
2047-48 Fiscal Year
Building Interior - Drinking Fountains, 2022 $24,393.53 Equipment - HVAC, Ventilation Fans $89,442.94
Sub Total $113,836.47
2049-50 Fiscal Year
Streets - Asphalt, Repair/Seal & Stripe $46,021.66
Sub Total $46,021.66
2050-51 Fiscal Year
Equipment - Surveillance System $88,851.56
Roofs - Built Up, Coating, 2020 $286,946.11
Sub Total $375,797.67
2052-53 Fiscal Year
Building Interior - Drinking Fountains, Original $56,557.57 Building Interior - Floor, Vinyl Tile $111,411.35
Building Interior - Wall, Wallpaper $108,675.37
Building Interior - Window Blinds $191,836.22
Equipment - Audio/Video $186,404.33
Equipment - Back Up, Power Supply $141,393.93
Equipment - Fire Control Panels $86,014.64
Equipment - HVAC, Package Units $1,244,266.59
Lighting - Exterior, Grounds, Original $296,927.25
Roofs - Glass $88,371.21
Streets - Asphalt, Major Rehab $201,156.43
Sub Total $2,713,014.89
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 236 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 24 Laguna Hills Community Center
Projections
Directed Cash Flow Method
Fiscal
Year
Beginning
Balance
Member
Contribution
Interest
Contribution Expenses
Ending
Balance
Fully
Funded
Balance
Percent
Funded
2023-24 $0 $474,500 $2,100 $147,270 $329,330 $5,036,231 7% 2024-25 $329,330 $488,735 $4,205 $413,883 $408,387 $5,084,022 8% 2025-26 $408,387 $503,397 $13,625 $189,905 $735,503 $5,381,473 14% 2026-27 $735,503 $518,499 $29,560 $0 $1,283,562 $5,899,709 22% 2027-28 $1,283,562 $534,054 $26,525 $654,931 $1,189,210 $5,749,906 21% 2028-29 $1,189,210 $550,076 $40,259 $116,345 $1,663,200 $6,178,893 27% 2029-30 $1,663,200 $566,578 $57,669 $25,481 $2,261,965 $6,728,543 34% 2030-31 $2,261,965 $583,575 $70,563 $208,070 $2,708,033 $7,112,715 38% 2031-32 $2,708,033 $601,082 $90,702 $0 $3,399,817 $7,741,244 44% 2032-33 $3,399,817 $619,115 $0 $4,006,276 $2,795 $4,150,827 0% 2033-34 $2,795 $637,688 $4,542 $144,162 $500,863 $4,562,841 11% 2034-35 $500,863 $656,819 $14,917 $309,830 $862,769 $4,824,671 18% 2035-36 $862,769 $676,524 $28,944 $219,573 $1,348,663 $5,203,719 26% 2036-37 $1,348,663 $696,819 $27,098 $775,386 $1,297,195 $5,018,494 26% 2037-38 $1,297,195 $717,724 $25,313 $792,128 $1,248,104 $4,824,389 26% 2038-39 $1,248,104 $739,256 $48,212 $0 $2,035,572 $5,479,700 37% 2039-40 $2,035,572 $761,433 $71,430 $34,244 $2,834,190 $6,133,659 46% 2040-41 $2,834,190 $784,276 $87,543 $313,512 $3,392,497 $6,526,738 52% 2041-42 $3,392,497 $807,804 $111,558 $92,995 $4,218,864 $7,181,805 59% 2042-43 $4,218,864 $832,039 $97,365 $1,397,050 $3,751,218 $6,489,792 58% 2043-44 $3,751,218 $857,000 $86,088 $1,311,526 $3,382,780 $5,885,649 57% 2044-45 $3,382,780 $882,710 $97,938 $565,210 $3,798,218 $6,072,925 63% 2045-46 $3,798,218 $909,191 $119,157 $295,088 $4,531,479 $6,570,702 69% 2046-47 $4,531,479 $936,467 $123,789 $888,509 $4,703,226 $6,472,712 73% 2047-48 $4,703,226 $964,561 $152,965 $113,836 $5,706,915 $7,213,056 79% 2048-49 $5,706,915 $993,498 $187,356 $0 $6,887,769 $8,116,388 85% 2049-50 $6,887,769 $1,023,303 $222,287 $46,022 $8,087,336 $9,018,604 90% 2050-51 $8,087,336 $1,054,002 $249,168 $375,798 $9,014,708 $9,619,254 94% 2051-52 $9,014,708 $1,085,622 $289,243 $0 $10,389,573 $10,658,470 97% 2052-53 $10,389,573 $1,118,190 $248,994 $2,713,015 $9,043,742 $8,873,144 102%
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 237 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 25 Laguna Hills Community Center
Projection Charts
Directed Cash Flow Method
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 238 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 26 Laguna Hills Community Center
Projection Charts
Directed Cash Flow Method
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 239 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 27 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Mastic material (deck caulking) prevents moisture from seeping through the expansion joints in the concrete deck, which otherwise could result in cracking these surfaces. The mastic material should be carefully monitored for deterioration and replaced as soon as water tight integrity is lost.
We have excluded budgeting for this component as we anticipate it will be replaced on an as-needed basis and the cost would fall below the $20,000 threshold the City has established.
Category
Concrete - Mastic, Unfunded
Placed In Service
Useful Life
Remaining Life
Replacement Year
010 Asphalt & Concrete
01/2002
n.a.
n.a.
n.a.
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 comment
$0.00
0.00%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 240 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 28 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The inventory for this component represents the decorative, colored concrete at the walkways and courtyards surrounding the community center. We have budgeted for complete replacement of this concrete on a 40-year cycle. Minor repairs, as needed, should be addressed immediately as a maintenance issue due to safety concerns. The overall condition of the concrete should be monitored through time and the estimates adjusted accordingly.
Category
Concrete - Replacement
Placed In Service
Useful Life
Remaining Life
Replacement Year
010 Asphalt & Concrete
07/2002
40 19
2042-43
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
30,643 sq. ft.
$26.00
100.00%
$796,718.00
$1,397,049.84
$0.00
$1,336.08
$5.91
$1,341.99
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 241 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 29 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Streets - Asphalt, Major Rehab
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
010 Asphalt & Concrete
07/2002
24 +2
5 2028-29
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
21,340 sq. ft.
$4.00
100.00%
$85,360.00
$98,955.63
$0.00
$545.50
$2.41
$547.91
Most asphalt areas can be expected to last approximately 20 years before it will become necessary for an overlay to be applied. This can double the life of the surface upon application. It will be necessary to adjust manhole and valve covers at the time the overlay is applied. Deflection testing should be conducted by an independent consultant near the end of the estimated useful life to determine the condition of the asphalt and estimated remaining life before the overlay is required.
In addition to this service, a consultant may be obtained to prepare the application specifications, and to work with the contractor during actual installation. It is recommended that the client obtain bids for such a consultation near the end of the estimated useful life. As costs vary, a provision for this consulting has not been included in this cost estimate. Should the client request, this cost can be incorporated into this analysis.
The remaining life of the asphalt overlay has been adjusted to align with the future replacement cycles of the asphalt repairs and seal coating.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 242 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 30 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The remaining life of this component has been extended at the request of the client.
Asphalt surfaces should be seal coated within 3 years of their initial installation. Thereafter, a 3 to 5 year cycle should be observed and adjusted according to the client's particular needs.
We have budgeted for the asphalt to be repaired on the same cycle and in conjunction with the seal coating of the asphalt.
The unit cost includes any restriping that may be necessary.
Category
Streets - Asphalt, Repair/Seal & Stripe
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
010 Asphalt & Concrete
07/2009
5 +10
1 2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
21,340 sq. ft.
$1.00
100.00%
$21,340.00
$21,980.20
$0.00
$682.43
$3.02
$685.45
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 243 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 31 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The flat roofing over a portion of the community center will be coated with 2 coats of elastomeric coating in 2024.
In order to ensure a high quality installation, the client may wish to obtain the services of an independent roofing consultant to work with the client and the roofing contractor providing installation. Consultants are available for the preparation of installation specifications and, if desired, to work with the contractor during the installation process. Fees for these services vary based on the size of the project and detail required by the client, and have not been included in the cost used for this component. Should the client desire, a provision for a consultant can be incorporated into this analysis.
Category
Roofs - Built Up, Coating, 2020
Placed In Service
Useful Life
Remaining Life
Replacement Year
020 Roofs
07/2020
10 7
2030-31
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
12,918 sq. ft.
$10.00
100.00%
$129,180.00
$158,875.11
$0.00
$589.43
$2.61
$592.04
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 244 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 32 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The flat roofing over a portion of the community center will be coated with 2 coats of elastomeric coating in 2024.
In order to ensure a high quality installation, the client may wish to obtain the services of an independent roofing consultant to work with the client and the roofing contractor providing installation. Consultants are available for the preparation of installation specifications and, if desired, to work with the contractor during the installation process. Fees for these services vary based on the size of the project and detail required by the client, and have not been included in the cost used for this component. Should the client desire, a provision for a consultant can be incorporated into this analysis.
Category
Roofs - Built Up, Coating, 2024
Placed In Service
Useful Life
Remaining Life
Replacement Year
020 Roofs
07/2002
10 0
2023-24
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
10,727 sq. ft.
$10.00
100.00%
$107,270.00
$144,161.91
$0.00
$342.41
$1.52
$343.93
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 245 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 33 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The roofing specifications are unknown; therefore, the cost used for this built-up roof is based on replacing it with a 3 ply roof membrane. The useful life used is based on the assumption that the roof will be inspected annually and maintained as needed.
In order to ensure a high quality installation, the client may wish to obtain the services of an independent roofing consultant to work with the client and the roofing contractor providing installation. Consultants are available for the preparation of installation specifications and, if desired, to work with the contractor during the installation process. Fees for these services vary based on the size of the project and detail required by the client, and have not been included in the cost used for this component. Should the client desire, a provision for a consultant can be incorporated into this analysis.
Category
Roofs - Built Up, Replacement
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
020 Roofs
07/2002
40 +1
20 2043-44
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
23,645 sq. ft.
$10.00
100.00%
$236,450.00
$427,055.00
$0.00
$376.62
$1.67
$378.29
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 246 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 34 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This metal framed glass pitched roof cover measures approximately 375 sq. ft. and is located above the hallway near the gym entrance.
Category
Roofs - Glass
Placed In Service
Useful Life
Remaining Life
Replacement Year
020 Roofs
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$37,500.00
100.00%
$37,500.00
$42,206.58
$0.00
$299.62
$1.33
$300.95
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 247 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 35 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are plexiglass skylights:
Category
Roofs - Skylights
Placed In Service
Useful Life
Remaining Life
Replacement Year
020 Roofs
07/2002
20 0
2023-24
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$40,000.00
100.00%
$40,000.00
$72,244.45
$0.00
$63.71
$0.28
$63.99
8 skylights, 7' x 7' @ $5,000.00 = $40,000.00
TOTAL = $40,000.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 248 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 36 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Tile roofs are designed to last the life of a community. However, the underlayment (waterproof membrane underneath the roof tiles) can be subject to deterioration and failure through time. The timing and rate of failure is difficult to predict and can vary significantly from one project to another depending largely on the quality of the original design and construction (materials and installation), exposure to outside influences (climate, foot traffic, etc.) and the level of routine maintenance.
For the purposes of this analysis, we have budgeted for the replacement of the tile underlayment to include removing the existing tiles, replacing the underlayment material and reinstalling the existing tiles with a provision for breakage.
In order to ensure a high quality installation, the client may wish to obtain the services of an independent roofing consultant to work with the client and the roofing contractor providing installation. Consultants are available for the preparation of installation specifications and, if desired, to work with the contractor during the installation process. Fees for these services vary based on the size of the project and detail required by the client, and have not been included in the cost used for this component. Should the client desire, a provision for a consultant can be incorporated into this analysis.
Category
Roofs - Tile
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
020 Roofs
07/2002
40 +1
20 2043-44
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
20,465 sq. ft.
$16.00
100.00%
$327,440.00
$591,393.06
$0.00
$521.55
$2.31
$523.86
Due to the nature and size of the expense, funding for the gutters and downspouts has been excluded. It is anticipated that any expenditures can be effectively budgeted for on an as-needed basis by the client's operating and/or reserve contingency funds. This component is listed for inventory purposes only.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 249 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 37 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The remaining life of this component has been extended due to the current financial condition of the client.
Category
Painting - Exterior
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
030 Painting
07/2002
10 +12
1 2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
35,670 sq. ft.
$2.50
100.00%
$89,175.00
$91,850.25
$0.00
$2,851.70
$12.62
$2,864.32
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 250 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 38 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Painting - Interior
Placed In Service
Useful Life
Remaining Life
Replacement Year
030 Painting
07/2015
10 2
2025-26
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
77,002 sq. ft.
$2.00
100.00%
$154,004.00
$163,382.84
$0.00
$2,461.93
$10.89
$2,472.82
Painting costs can vary tremendously depending on quality of materials, preparation, detail work and local labor costs.
Gym and dance studio 27,872 sq. ft.
Main floor lobby/hallway 13,681
Heritage Room(s) 9,240
2nd floor hallways 8,644
2nd floor classrooms 5,978
2nd floor offices 5,975
Restrooms 4,910
Kitchen 702
77,002 sq. ft.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 251 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 39 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Fencing - Metal
Placed In Service
Useful Life
Remaining Life
Replacement Year
040 Fencing/Walls
07/2002
35 14
2037-38
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$159,470.00
100.00%
$159,470.00
$241,212.68
$0.00
$363.31
$1.61
$364.91
252 lin. ft. of 4-5' decorative wrought iron @ $150.00 = $37,800.00 760 lin. ft. of aluminum handrail @ $110.00 = $83,600.00 282 lin. ft. of 3.5' aluminum railing @ $135.00 = $38,070.00 TOTAL = $159,470.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 252 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 40 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are stone and precast concrete covered walls.
It is estimated that a percentage of the stone and precast concrete walls will require repair or replacement through time.
The actual condition of these walls should be monitored and the percentage of replacement and remaining life estimates adjusted accordingly.
Category
Walls - Masonry
Placed In Service
Useful Life
Remaining Life
Replacement Year
040 Fencing/Walls
07/2002
35 14
2037-38
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
16,730 sq. ft.
$28.00
50.00%
$234,220.00
$354,278.77
$0.00
$533.60
$2.36
$535.96
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 253 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 41 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Lighting - Exterior, Building
Placed In Service
Useful Life
Remaining Life
Replacement Year
050 Lighting
07/2021
20 18
2041-42
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$29,625.00
100.00%
$29,625.00
$50,434.58
$0.00
$52.45
$0.23
$52.68
31 recessed spots @ $250.00 = $7,750.00
23 recessed step lights @ $575.00 = $13,225.00
6 large vapor floods @ $975.00 = $5,850.00
4 LED column lights @ $700.00 = $2,800.00
TOTAL = $29,625.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 254 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 42 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Lighting - Exterior, Grounds, Newer
Placed In Service
Useful Life
Remaining Life
Replacement Year
050 Lighting
07/2020
20 17
2040-41
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$20,500.00
100.00%
$20,500.00
$33,883.38
$0.00
$38.44
$0.17
$38.61
The actual date this component was placed into service is not available. For budgeting purposes, this date has been estimated based on its condition at our most recent site visit.
We have excluded budgeting for the landscape flood lighting throughout the grounds as we anticipate these fixtures will be replaced on an as-needed basis.
1 - 20' pole w/single LED lantern @ $4,500.00 = $4,500.00 1 - 20' pole w/four LED lanterns @ $16,000.00 = $16,000.00 TOTAL = $20,500.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 255 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 43 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Lighting - Exterior, Grounds, Original
Placed In Service
Useful Life
Remaining Life
Replacement Year
050 Lighting
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$126,000.00
100.00%
$126,000.00
$141,814.11
$0.00
$1,006.72
$4.45
$1,011.18
21 - concrete bollard fixtures @ $3,000.00 = $63,000.00 12 - 16' poles w/decorative vapor lanterns @ $5,250.00 = $63,000.00 TOTAL = $126,000.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 256 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 44 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The interior lighting was upgraded/converted to LED in approximately 2021.
Category
Lighting - Interior
Placed In Service
Useful Life
Remaining Life
Replacement Year
050 Lighting
07/2021
25 23
2046-47
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$352,200.00
100.00%
$352,200.00
$695,097.17
$0.00
$487.52
$2.16
$489.68
1ST FLOOR:
204 recessed spots @ $200.00 = $40,800.00
136 fluorescent fixtures w/diffusers @ $450.00 = $61,200.00 16 large wall sconces @ $575.00 = $9,200.00
31 single sided EXIT signs @ $300.00 = $9,300.00
40 large ceiling vapor fixtures, gym @ $1,600.00 = $64,000.00 12 large iron/glass chandelier @ $8,500.00 = $102,000.00 11 stage lights w/control panels @ $2,500.00 = $27,500.00 2ND FLOOR:
98 recessed spots @ $200.00 = $19,600.00
14 single sided EXIT signs @ $300.00 = $4,200.00
32 fluorescent fixtures w/diffusers @ $450.00 = $14,400.00 TOTAL = $352,200.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 257 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 45 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Cabinets/Counters
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$249,900.00
100.00%
$249,900.00
$326,062.82
$0.00
$886.51
$3.92
$890.43
2nd FLOOR CLASSROOMS:
59 lin. ft. of laminated base cabinets @ $800.00 = $47,200.00 63 lin. ft. of laminated wall cabinets @ $750.00 = $47,250.00 59 lin. ft. of laminated counters @ $325.00 = $19,175.00 1st FLOOR LOBBY/HALL:
45 lin. ft. of laminated base cabinets @ $800.00 = $36,000.00 45 lin. ft. of granite counters @ $400.00 = $18,000.00
GYM/DANCE STUDIO:
25 lin. ft. of laminated base cabinets @ $800.00 = $20,000.00 12 lin. ft. of laminated wall cabinets @ $750.00 = $9,000.00 25 lin. ft. of laminated counters @ $325.00 = $8,125.00 HERITAGE ROOM(S):
22 lin. ft. of laminated base cabinets @ $800.00 = $17,600.00 22 lin. ft. of laminated wall cabinets @ $750.00 = $16,500.00 34 lin. ft. of laminated counters @ $325.00 = $11,050.00 TOTAL = $249,900.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 258 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 46 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are fiberboard ceiling panels:
Category
Building Interior - Ceiling Panels
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
11,389 sq. ft.
$4.50
100.00%
$51,250.50
$66,870.28
$0.00
$181.81
$0.80
$182.61
2nd Floor Classrooms 1,125 sq. ft.
2nd Floor Hall 2,108
1st Floor Hall/Lobby 2,974
Dance Studio 1,591
Kitchen 891
Heritage Room(s) 2,700
11,389 sq. ft.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 259 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 47 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These Halsey Taylor wall mounted stainless steel fountains with bottle fillers were replaced in 2022.
Category
Building Interior - Drinking Fountains, 2022
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2022
25 24
2047-48
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
2 fountains
$6,000.00
100.00%
$12,000.00
$24,393.53
$0.00
$15.92
$0.07
$15.99
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 260 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 48 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are wall mounted stainless steel fountains.
Category
Building Interior - Drinking Fountains, Original
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
4 fountains
$6,000.00
100.00%
$24,000.00
$27,012.21
$0.00
$191.76
$0.85
$192.60
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 261 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 49 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The actual date this component was placed into service is not available. For budgeting purposes, this date has been estimated based on its condition at our most recent site visit.
Category
Building Interior - Floor, Carpet
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2014
10 1
2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1,059 sq. yds.
$100.00
107.00%
$113,313.00
$116,712.39
$0.00
$3,623.61
$16.03
$3,639.64
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component. 1st floor common areas 51
Heritage room(s) 508 sq. yds.
2nd floor + meeting room 500
1,059 sq. yds.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 262 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 50 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Floor, Ceramic Tile
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$331,450.00
103.00%
$341,393.50
$445,441.08
$0.00
$1,211.08
$5.36
$1,216.44
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.
The cost for this component includes the removal and disposal of the existing material. 1st FLOOR:
5,711 sq. ft. of floor tile, lobby @ $35.00 = $199,885.00 891 sq. ft. of floor tile, kitchen @ $35.00 = $31,185.00 1,290 sq. ft. of floor tile w/travertine accents @ $70.00 = $90,300.00 2nd FLOOR:
288 sq. ft. of floor tile @ $35.00 = $10,080.00
TOTAL = $331,450.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 263 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 51 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Floor, Vinyl Tile
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$45,900.00
103.00%
$47,277.00
$53,210.68
$0.00
$377.74
$1.67
$379.41
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.
The cost for this component includes the removal and disposal of the existing material. 2nd FLOOR CLASSROOMS:
1,935 sq. ft. of floor tile @ $20.00 = $38,700.00
STAIRWELL:
360 sq. ft. of floor tile @ $20.00 = $7,200.00
TOTAL = $45,900.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 264 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 52 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Floor, Wood
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$661,080.00
103.00%
$680,912.40
$888,436.24
$0.00
$2,415.51
$10.69
$2,426.20
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.
The cost for this component includes the removal and disposal of the existing material. 1st FLOOR:
13,936 sq. ft. of wood floor, gym @ $40.00 = $557,440.00 1,591 sq. ft. of wood tile, dance studio @ $40.00 = $63,640.00 1,000 sq. ft. of wood floor, stage @ $40.00 = $40,000.00 TOTAL = $661,080.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 265 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 53 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category During our March 2008 site visit we observed office furniture, classroom type furniture and banquet furniture at the community center. We anticipate this furniture will be replaced on an as-needed basis and have therefore excluded budgeting for it in this analysis.
Category
Building Interior - Furniture, Unfunded
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
n.a.
n.a.
n.a.
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 comment
$0.00
0.00%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 266 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 54 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are Porter regulation style electric basketball assemblies with glass backboards.
Category
Building Interior - Gym, Basketball Backboards
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
6 backboards
$12,500.00
100.00%
$75,000.00
$97,857.99
$0.00
$266.06
$1.18
$267.24
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 267 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 55 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are wood telescoping bleachers:
Category
Building Interior - Gym, Bleachers
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
35 14
2037-38
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$130,000.00
100.00%
$130,000.00
$196,636.66
$0.00
$296.17
$1.31
$297.48
2 - 36' x 11 rows @ $40,000.00 = $80,000.00
2 - 48' x 4 rows @ $25,000.00 = $50,000.00
TOTAL = $130,000.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 268 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 56 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category During our October 2023 on site visit we observed the following commercial kitchen equipment:
63 lin. ft. of stainless steel tables/sinks
1 - Wolf commercial 6-burner range/oven
1 - 4' x 7' commercial range hood
1 - Wolf commercial griddle
1 - Champion commercial dishwasher
1 - ISE commercial garbage disposer
1 - Marley air door
1 - Randell freezer
1 - Beverage-Aire 3-door refrigerator
1 - Ice-O-Matic large ice maker
3 - Wells warming wells
2 - Crescor warming racks
1 - Randell refrigerated sandwich table
1 - Savory commercial toaster
We anticipate this equipment will be replaced/added to through time and therefore have budgeted a general provision for this equipment over a 15-year period.
Category
Building Interior - Kitchen Equipment
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
070 Building Interior
07/2002
20 +2
1 2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 provision
$80,000.00
100.00%
$80,000.00
$82,400.00
$0.00
$2,558.30
$11.32
$2,569.62
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 269 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 57 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Restroom Remodel, Floor 1
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$513,710.00
100.00%
$513,710.00
$670,275.03
$0.00
$1,822.36
$8.06
$1,830.43
RESTROOM PARTITIONS:
21 solid plastic stall partitions @ $4,500.00 = $94,500.00 6 solid plastic urinal dividers @ $2,000.00 = $12,000.00 PLUMBING FIXTURES:
21 toilets, flush valve @ $2,000.00 = $42,000.00
7 urinals, wall mount unit @ $2,000.00 = $14,000.00
22 sinks, counter oval @ $1,600.00 = $35,200.00
4 solid plastic shower dividers @ $3,500.00 = $14,000.00 COUNTERS:
89 lin. ft. of solid surface counters @ $450.00 = $40,050.00 WALL/FLOOR COVER:
3,540 sq. ft. of ceramic wall tile @ $40.00 = $141,600.00 2,256 sq. ft. of ceramic floor tile @ $35.00 = $78,960.00 CABINETS:
21 lin. ft. of laminated base cabinets @ $900.00 = $18,900.00 5 lin. ft. of laminated pantry cabinets @ $1,300.00 = $6,500.00 KITCHEN:
1 Small Restroom Remodel @ $16,000.00 = $16,000.00
TOTAL = $513,710.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 270 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 58 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Restroom Remodel, Floor 2
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$89,460.00
100.00%
$89,460.00
$116,725.01
$0.00
$317.36
$1.40
$318.76
PLUMBING FIXTURES:
3 toilets, flush valve @ $2,000.00 = $6,000.00
1 urinal, wall mount unit @ $2,000.00 = $2,000.00
4 sinks, counter oval @ $1,600.00 = $6,400.00
RESTROOM PARTITIONS:
3 solid plastic stall partitions @ $4,500.00 = $13,500.00 1 solid plastic urinal divider @ $2,000.00 = $2,000.00
COUNTERS:
12 lin. ft. of solid surface counters @ $450.00 = $5,400.00 WALL/FLOOR COVER:
660 sq. ft. of ceramic wall tile @ $40.00 = $26,400.00
336 sq. ft. of ceramic floor tile @ $35.00 = $11,760.00 CLASSROOMS::
1 Small Restroom Remodel @ $16,000.00 = $16,000.00
TOTAL = $89,460.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 271 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 59 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are large room dividers located in the Heritage Room(s) and measures approximately 55' x 16'.
Category
Building Interior - Room Partitions
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
22 1
2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$98,000.00
100.00%
$98,000.00
$100,940.00
$0.00
$3,133.92
$13.87
$3,147.78
* These are large room dividers located in the Heritage Room(s) and measures approximately 55' x 16'. 2 large vinyl partitions, ballroom* @ $38,000.00 = $76,000.00 1 vinyl partition, classroom @ $22,000.00 = $22,000.00
TOTAL = $98,000.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 272 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 60 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Wall, Ceramic Tile
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$230,340.00
103.00%
$237,250.20
$309,557.70
$0.00
$841.64
$3.72
$845.36
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.
The cost for this component includes the removal and disposal of the existing material. 1st FLOOR:
792 sq. ft. of wall tile, lobby @ $45.00 = $35,640.00
1,620 sq. ft. of wall tile, kitchen @ $45.00 = $72,900.00 2,220 sq. ft. of stone veneer @ $50.00 = $111,000.00
240 sq. ft. of wall tile, gym @ $45.00 = $10,800.00
TOTAL = $230,340.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 273 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 61 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Wall, Wallpaper
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
2,745 sq. ft.
$16.00
105.00%
$46,116.00
$51,903.96
$0.00
$368.46
$1.63
$370.09
The unit cost indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.
The cost for this component includes the removal and disposal of the existing material. 2nd floor classrooms 1,125 sq. ft.
Heritage room(s) 1,620
2,745 sq. ft.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 274 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 62 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are motorized roller type window shades:
Category
Building Interior - Window Blinds
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1,809 sq. ft.
$45.00
100.00%
$81,405.00
$91,622.04
$0.00
$650.41
$2.88
$653.29
2nd Floor Classrooms 460 sq. ft.
Dance Studio 530
Heritage Room(s) 819
1,809 sq. ft.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 275 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 63 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Exterior - Doors
Placed In Service
Useful Life
Remaining Life
Replacement Year
080 Building Exterior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$163,500.00
100.00%
$163,500.00
$213,330.42
$0.00
$580.01
$2.57
$582.58
11 - 3' x 8' metal/glass doors @ $4,500.00 = $49,500.00 8 - 4' x 8' metal/glass doors @ $5,000.00 = $40,000.00
7 - 4' x 8' metal doors @ $4,000.00 = $28,000.00
4 - 3.5' x 8' metal/glass doors @ $4,750.00 = $19,000.00 4 - 3' x 8' metal doors @ $3,500.00 = $14,000.00
2 - 3.5' x 8' metal doors w/vents @ $4,000.00 = $8,000.00 1 - 6.5' x 9' metal roll up door @ $5,000.00 = $5,000.00 TOTAL = $163,500.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 276 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 64 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Equipment - Audio/Video
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$79,100.00
100.00%
$79,100.00
$89,027.75
$0.00
$632.00
$2.80
$634.79
The cost estimate for this component has been calculated based on the inventory identified herein. It is likely that future replacements will vary and, therefore, the cost used should be considered as a general indication of budgetary needs rather than specific to this inventory.
1 large roll-up movie screen @ $7,500.00 = $7,500.00
4 wall mounted speakers @ $600.00 = $2,400.00
5 x-large suspended speakers @ $4,000.00 = $20,000.00
4 large JBL speakers @ $2,000.00 = $8,000.00
27 in ceiling speakers @ $600.00 = $16,200.00
1 total, sound equipment package* @ $25,000.00 = $25,000.00 TOTAL = $79,100.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 277 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 65 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a Dual Lite Spectron LSN battery back-up power inverter system located in the rear mechanical room.
Category
Equipment - Back Up, Power Supply
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$60,000.00
100.00%
$60,000.00
$67,530.53
$0.00
$479.39
$2.12
$481.51
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 278 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 66 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category We have excluded budgeting at this time for the computer/office equipment and furnishings & fixtures located throughout the Community Center offices and classrooms. We anticipate this equipment will be replaced/upgraded on an as-needed basis and not all at one time.
Category
Equipment - Electronic/Office, Unfunded
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
n.a.
n.a.
n.a.
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 comment
$0.00
0.00%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 279 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 67 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a 3-floor hydraulic elevator.
We have budgeted a provision for refurbishing the interior of the elevator cabs to include laminated wall covering, ceramic floor cover, fluorescent lighting, etc.
The remaining life of this component has been extended due to its condition at our most recent site visit.
Category
Equipment - Elevator, Cab Refurbishing
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
090 Equipment
07/2002
15 +11
5 2028-29
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 elevator
$15,000.00
100.00%
$15,000.00
$17,389.11
$0.00
$95.86
$0.42
$96.28
Note: costs should be considered general estimates.
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 280 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 68 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a 3-floor hydraulic elevator.
This component is for the additional major repair costs associated with hydraulic style elevators such as valve and cylinder replacements.
Category
Equipment - Elevator, Modernization
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 elevator
$250,000.00
100.00%
$250,000.00
$326,193.30
$0.00
$886.86
$3.92
$890.79
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 281 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 69 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a Silent Knight RPS-1000 fire control panel located in the rear mechanical room.
Category
Equipment - Fire Control Panels
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 panel
$36,500.00
100.00%
$36,500.00
$41,081.07
$0.00
$291.63
$1.29
$292.92
1 small notifier panel @ $4,000.00 = $4,000.00
1 large control panel, IFP-1000 @ $20,000.00 = $20,000.00 1 large panel, RPS-1000 @ $12,500.00 = $12,500.00
TOTAL = $36,500.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 282 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 70 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are 80-100 gallon commercial, natural gas hot water boilers.
Category
Equipment - HVAC, Boilers
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
090 Equipment
07/2002
16 +7
2 2025-26
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
2 boilers
$12,500.00
100.00%
$25,000.00
$26,522.50
$0.00
$399.65
$1.77
$401.42
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 283 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 71 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are stainless steel heaters suspended in the gym ceiling.
Category
Equipment - HVAC, Heaters
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
8 heaters
$6,500.00
100.00%
$52,000.00
$67,848.21
$0.00
$184.47
$0.82
$185.28
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 284 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 72 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The HVAC units were replaced in 2020 for $411,000.
Category
Equipment - HVAC, Package Units
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2020
16 13
2036-37
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$528,000.00
100.00%
$528,000.00
$775,385.80
$0.00
$1,295.68
$5.73
$1,301.42
* This unit is located on the roof and serves the Mechanical room. 1 Carrier 12.5 ton unit @ $45,000.00 = $45,000.00
2 Carrier 6 ton units @ $32,500.00 = $65,000.00
5 Carrier 5 ton units @ $30,000.00 = $150,000.00
5 Carrier 7.5 ton units @ $37,500.00 = $187,500.00
1 Carrier mini split unit* @ $8,000.00 = $8,000.00
1 Sterling gas furnace @ $10,000.00 = $10,000.00
1 make up air unit @ $15,000.00 = $15,000.00
1 Carrier 15 ton unit @ $47,500.00 = $47,500.00
TOTAL = $528,000.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 285 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 73 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are Loren Cook ventilation fans located on the roof:
Category
Equipment - HVAC, Ventilation Fans
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
090 Equipment
07/2002
20 +5
4 2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$44,000.00
100.00%
$44,000.00
$49,522.39
$0.00
$351.55
$1.56
$353.11
The remaining life of this component has been extended due to its condition at our most recent site visit. 4 large ventilation fans @ $4,500.00 = $18,000.00
4 x-large ventilation fans @ $6,500.00 = $26,000.00
TOTAL = $44,000.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 286 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 74 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The actual date this component was placed into service is not available. For budgeting purposes, this date has been estimated based on its condition at our most recent site visit.
Category
Equipment - Surveillance System
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2020
10 7
2030-31
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 system
$40,000.00
100.00%
$40,000.00
$49,194.95
$0.00
$182.51
$0.81
$183.32
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 287 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 75 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a very large, elaborate water feature consisting of 4 precast concrete bowls that create a waterfall into small circular ponds. A trough measuring approximately 165' in length runs along the wall behind the "falls" emptying into a large pond. This feature is constructed of concrete, and decorative mosaic and ceramic tiles.
We have budgeted for a major rehab of this water feature on a 30-year cycle to include fountain repairs/replacements, replastering the base pools, tile replacement, lighting, equipment, etc. The actual condition of the fountain should be monitored through time and the estimates adjusted accordingly.
Category
Grounds - Fountain, Refurbish
Placed In Service
Useful Life
Remaining Life
Replacement Year
100 Grounds
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 fountain
$250,000.00
100.00%
$250,000.00
$326,193.30
$0.00
$886.86
$3.92
$890.79
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 288 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 76 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Grounds - Park Furnishings
Placed In Service
Useful Life
Remaining Life
Replacement Year
100 Grounds
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$116,100.00
100.00%
$116,100.00
$151,484.17
$0.00
$411.86
$1.82
$413.68
23 - concrete planter pots (various sized) @ $1,200.00 = $27,600.00 8 - 4' x 4' concrete benches w/o backs @ $4,500.00 = $36,000.00 7 - concrete trash receptacles @ $2,000.00 = $14,000.00 7 - 7' concrete benches w/backs @ $5,500.00 = $38,500.00 TOTAL = $116,100.00
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 289 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 77 Laguna Hills Community Center
Component Detail Index
Page
Building Exterior - Doors 63
Building Interior - Cabinets/Counters 45
Building Interior - Ceiling Panels 46
Building Interior - Drinking Fountains, 2022 47
Building Interior - Drinking Fountains, Original 48
Building Interior - Floor, Carpet 49
Building Interior - Floor, Ceramic Tile 50
Building Interior - Floor, Vinyl Tile 51
Building Interior - Floor, Wood 52
Building Interior - Furniture, Unfunded 53
Building Interior - Gym, Basketball Backboards 54
Building Interior - Gym, Bleachers 55
Building Interior - Kitchen Equipment 56
Building Interior - Restroom Remodel, Floor 1 57
Building Interior - Restroom Remodel, Floor 2 58
Building Interior - Room Partitions 59
Building Interior - Wall, Ceramic Tile 60
Building Interior - Wall, Wallpaper 61
Building Interior - Window Blinds 62
Concrete - Mastic, Unfunded 27
Concrete - Replacement 28
Equipment - Audio/Video 64
Equipment - Back Up, Power Supply 65
Equipment - Electronic/Office, Unfunded 66
Equipment - Elevator, Cab Refurbishing 67
Equipment - Elevator, Modernization 68
Equipment - Fire Control Panels 69
Equipment - HVAC, Boilers 70
Equipment - HVAC, Heaters 71
Equipment - HVAC, Package Units 72
Equipment - HVAC, Ventilation Fans 73
Equipment - Surveillance System 74
Fencing - Metal 39
Grounds - Fountain, Refurbish 75
Grounds - Park Furnishings 76
Lighting - Exterior, Building 41
Lighting - Exterior, Grounds, Newer 42
Lighting - Exterior, Grounds, Original 43
Lighting - Interior 44
Painting - Exterior 37
Painting - Interior 38
Roofs - Built Up, Coating, 2020 31
Roofs - Built Up, Coating, 2024 32
Roofs - Built Up, Replacement 33
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 290 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) 78 Laguna Hills Community Center
Component Detail Index
Roofs - Glass 34
Roofs - Skylights 35
Roofs - Tile 36
Streets - Asphalt, Major Rehab 29
Streets - Asphalt, Repair/Seal & Stripe 30
Walls - Masonry 40
50 Components
11.8.2023(1) Advanced Reserve Solutions, Inc.
4.8.b
Packet Pg. 291 Attachment: Community Center Reserve Study Report (3408 : Reserve Study for the Community Center) City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 12, 2024
TO: Mayor and Council Members
FROM: Jarad Hildenbrand
City Manager
ISSUE: Update on Comprehensive Review of City Council Policies and Administrative Orders
RECOMMENDATION: That the City Council review the City Council Policies and Administrative Orders and provide direction to staff.
SUMMARY:
The City’s Administrative Orders and City Council Policy Manual were first adopted in 1992 and 1994, respectively, with the goal of implementing best practices for the internal operation of the City, promoting organizational efficiencies, and providing consistency in the delivery of City programs and services. These policies and procedures cover a broad range of topics from those established by and for the City Council, to general administration, to specific departmental operations. Over the years, new orders, policies and procedures have been established, and existing orders, policies and procedures have been amended to reflect the organization's most current goals and actual practices.
In 2024, the City will conduct a comprehensive review of our organization's policies and procedures. The proposed comprehensive update is meant to align with current and actual organizational practices and are intended to further improve efficiencies, reflect best management practices, as well as reinforce the council-manager form of government.
During the January 23, 2023, City Council meeting, Mayor Wheeler requested that Council Members receive and review the approved City Council Policies and
7.1.1 Packet Pg. 292
Update on Comprehensive Review of City Council Policies and Administrative Orders March 12, 2024
Administrative Orders, create a priority list of items that should be removed or updated, and return at the February 27, 2024, meeting for further direction. This report serves as a follow-up to that direction.
After the January 23, 2024, meeting, the City Manager circulated the policies, gathered input from City Council Members, and worked with the Mayor to develop a list of recommendations (Attachment A), which will be presented to the City Council at the March 12th meeting.
ATTACHMENTS:
• City Policy Update Status and Priority Ranking Sheet
7.1.1 Packet Pg. 293
# Policy/Order/Code Name Type Status Priority Rank Recommendation 101 City Council Policy Manual City Council Policy 1 Update and Keep105 Financial Policies City Council Policy 1 Update and Keep110 City Recognition Policy City Council Policy 4 Update and Keep120 Procedures for Placing Items on a Future City Council Agenda City Council Policy Complete 5125 Delivery of Agenda City Council Policy 3 Update and Keep126 Invocation at City Council Meetings City Council Policy 1 Reduce to a few suscinct lines;==130 Digital Device, Email Accounts, Electronic Communications City Council Policy 1 Update and Keep135 “Mayor’s Message” – Video Online Community Messaging City Council Policy 1 Eliminate or combine with 130201 Appointment of Commissioners City Council Policy 3 Update and keep205 Commissioner Attendance at Meetings City Council Policy 3 Add to 201301 Park Site Planning City Council Policy 2 Update and Keep305 Temporary and Seasonal Sponsorship Banners Displayed in City Parks City Council Policy 4 Update and Keep315 Tree Preservation City Council Policy 3 Update and Keep317 Public Facility Reservations & Use Policy City Council Policy In Revision 1 In Revision320 Contract Change Order City Council Policy 1 Combine into 105330 Placement of Telecommunication Facilities on City-owned land City Council Policy 4 Eliminate340 Disposition of Surplus Land City Council Policy 4 Eliminate; governed by the Surplus Land Act350 Residential Streets Traffic Management Policy City Council Policy 2 Update and Keep 1 Authority, Format, and Content of Administrative Orders. Administrative Orders Rescinded 5 Change "Effective Date" to "RESCINDED by Policy 14" and place large diagonal "RESCINDED" mark on all pages 2 Special Compensation for Unexpected Social Security Deduction Administrative Orders Delete 5 Change "Effective Date" to "DELETED" and place large diagonal "DELETED" mark on all pages 3 Compensatory Overtime for Meetings Taking Place After Normal Working Hours Administrative Orders Rescinded 5 Change "Effective Date" to "RESCINDED by Policy 13" and place large diagonal "RESCINDED" mark on all pages 4 Procedures for the Selection and Procurement of Professional Services Administrative Orders 1 Not sure what to do with this yet. I need to research more. 5 Personal Use of a City-Provided Cellular Telephone Administrative Orders 4 Move to Personnel Manual6 Procedures for Releasing Information Concerning City Personnel Administrative Orders 3 Move to Personnel Manual7 Reimbursing City Employees and Elected Officials for Travel Expenses Incurred while Conducting City Business Administrative Orders 1 Move to City Policies8 Policy Prohibiting Sexual Harassment in the Workplace Involving City and Contract Employees and City-hired Consultants Administrative Orders 1 Move to Personnel Manual 9 Annual Cash Out of Accumulated Vacation Leave Administrative Orders 3 Move to Personnel Manual 10 Meal Reimbursement Administrative Orders 5 Change "Effective Date" to "RESCINDED by Policy 24" and place large diagonal "RESCINDED" mark on all pages 11 Staff Responsibilities in the Event of a Local Emergency Administrative Orders 1 Move to Personnel Manual12 Scheduling and Approval of Time Off Administrative Orders 4 Move to Personnel Manual13 Overtime Pay and Compensatory Leave Time for Meetings Taking Place After Normal Working Hours Administrative Orders 4 Move to Personnel Manual14 Authority, Format, and Content of Administrative Orders Administrative Orders 115 Part-time Recreation Leader Classifications Administrative Orders 1 Eliminate; governed by the MOU16 Regulations Governing Electronic Information Access (Revised by Order No. 17) Administrative Orders 1 Combine #16 and #17 17 Revised Regulations Governing Electronic Information Access and Use Administrative Orders 1 Combine #16 and #17, Add to Personnel Manual 18 Proof of Automobile Insurance Administrative Orders 1 Move to Personnel Manual19 Revisions to Drug and Alcohol-Free Workplace Policy Administrative Orders 1 Move to Personnel Manual20 Community Center Bulletin Board Policy Administrative Orders 4 Move to City Policies21 Website Community Bulletin Board Policy Administrative Orders 3 Move to City Policies22 Environmentally Preferable Purchasing and Practices Administrative Orders 1 Move to City Policies; required by law23 Conflict of Interest Policy for Procurement Activities Administrative Orders 3 Move to City Policies24 Meal Reimbursement Administrative Orders 1 Update and Keep; combine with #725 Electronic Device Reimbursement Administrative Orders 1 Move to City Policies26 Public Use Social Media Policy Administrative Orders 1 Move to City Policies27 Policy for Review and Appeal of Parking Citations Administrative Orders 4 Eliminate 28 Use and Procurement of Organic Waste Administrative Orders 1 Move to City Policies; required by law29 Procurement Policies and Procedures for Federal Projects Administrative Orders 1 Combine with City Policies30 Financial Management and allowability of Costs for Federal Projects Administrative Orders 1 Combine with City Policies31 Automated License Plate Readers (ALPRs) Administrative Orders 1 Combine with City Policies32 Medical Emergency/Catastrophic Leave Administrative Orders 1 Move to Personnel Manual X Communicable Disease / Illness Policy Not Defined n/a Proposed or Administrative Orders X Order of Precedence Policy Not Defined n/a Proposed or Administrative OrdersX Non-disclosure Policy Not Defined n/a Proposed or Administrative Orders
7.1.1.a
Packet Pg. 294
Attachment: City Policy Update Status and Priority Ranking Sheet (3456 : Update on Comprehensive City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE:
TO:
FROM:
ISSUE:
March 12, 2024
Mayor and Council Members
Joe Ames, P.E., T.E.
Public Works Director/City Engineer
Studying No Overnight Parking in North Laguna Hills and the Urban Village Specific Area
RECOMMENDATION: That the City Council provide direction to the City Attorney and City staff on this issue.
SUMMARY:
At the January 17, 2024, Traffic Commission meeting, the Traffic Commission voted to approve the recommendation: “That the Traffic Commission: 1) Receive a presentation from Vice Chair Patel; and 2) Direct City staff to present a staff report to the City Council allowing the Traffic Commission to look into overnight parking restrictions within specific areas in North Laguna Hills and the Urban Village Specific Plan Areas.” City staff is interpreting “to look into” as “to research the feasibility of.” Based upon the Traffic Commission’s recommendation, City staff recommends that the City Council provide direction on this request, specifically, if the Traffic Commission and the City staff may research overnight parking restrictions within specific areas in North Laguna Hills and the Urban Village Specific Plan Areas. If City staff is to research overnight parking restrictions, City staff would also recommend that the City Council provide direction to the City Attorney to engage in this effort, especially because this part of the request affects mostly proposed, privately-controlled streets and the City Engineer has no knowledge of any applicable laws that would allow for overnight parking controls on privately-controlled streets.
7.2.1 Packet Pg. 295
No Overnight Parking in North Laguna Hills
March 12, 2024
BACKGROUND:
Sometimes, City staff receives requests from Traffic Commissioners to place items on the agenda for discussion at the next scheduled Traffic Commission meeting. Vice Chair Patel requested that City staff place on the January 17, 2024, agenda: “Studying the Implementation of Overnight Parking Restrictions within North Laguna Hills and the Urban Village Specific Plan Areas.”
Based upon the meeting discussion, Vice Chair Patel is specifically interested in studying implementation of overnight parking restrictions within the commercial areas of North Laguna Hills and the future Village at Laguna Hills development. In the past, at the September 20, 2023, Traffic Commission meeting, Vice Chair Patel has also suggested that the City should implement a citywide overnight parking restriction similar to the City of Brea. However, at that time, a recommendation to study overnight parking citywide was not approved by the Traffic Commission.
One part of the latest recommended action, studying the implementation of overnight parking restrictions within the Urban Village Specific Plan, would require assistance from the City Attorney’s office because this part of the request affects mostly proposed, privately-controlled streets and the City Engineer has no knowledge of any laws that would allow for overnight parking controls on privately-controlled streets.
Chapter 9-44, Access & Parking, within Title 9, Zoning, of the Municipal Code states:
9-44.010 Purpose and intent.
Access and parking regulations are intended to ensure that all land uses provide safe access and on-site circulation with adequate off-street parking and loading facilities. These regulations also ensure that the use of land does not impact the safety, use, or vehicular circulation within the public right-of-way. (Ord. 98-8 § 2 (part): prior code § 9-26.010)
Therefore, City staff is usually concerned with ensuring that enough parking is available on-site to not impact public streets, and consequently, not with controlling the time(s) that private parking may be used on-site.
The only public streets in the Urban Village Specific Plan are Paseo de Valencia, Los Alisos Boulevard, Avenida de la Carlota, and El Toro Road. Of these four public streets, the only street that allows for overnight street parking is Los Alisos Boulevard next to
7.2.1 Packet Pg. 296
No Overnight Parking in North Laguna Hills
March 12, 2024
the SoFi Apartments. That street is also posted as No Parking on Tuesdays for street sweeping. Otherwise, the interior streets within the Urban Village Specific Plan are privately-owned and privately-controlled. This area includes the proposed Village at Laguna Hills development.
Regarding overnight parking restrictions in North Laguna Hills commercial areas, the City has a few commercially zoned area streets east of Moulton Parkway signed as No Parking Anytime such as Alcalde, Peralta, and most of La Cadena. The City also has other commercially zoned area streets signed for No Parking 9PM to 6AM such as Vista Grande. All of the streets east of Moulton in this area have no parking on street sweeping day for a four (4) hour window.
FISCAL IMPACT:
Unknown.
7.2.1 Packet Pg. 297
City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE:
TO:
FROM:
ISSUE:
March 12, 2024
Mayor and Council Members
Joe Ames, P.E., T.E.
Public Works Director/City Engineer
Studying a Change to the Residential Permit Parking Program that Would Reduce Guest Permit Parking Passes from Four Permits to One Permit Per Household
RECOMMENDATION: That the City Council provide direction to the City Attorney and City staff on this issue.
SUMMARY:
At the January 17, 2024, Traffic Commission meeting, the Traffic Commission voted to approve the recommendation: “That the Traffic Commission: 1) Receive a presentation from Vice Chair Patel; and 2) Direct City staff to ask the City Attorney the feasibility of reducing existing and future permit parking guest passes, implementing new time and use restrictions on guest passes and for City staff to report back to the Traffic Commission with the City Attorney’s determination.” Vice Chair Patel was particularly interested in reducing the number of guest permit parking passes from four permits to one permit per household. Based upon the Traffic Commission recommendation, City staff recommends that the City Council provide direction to the City Attorney and City staff on this request.
BACKGROUND:
Sometimes, City staff receives requests from Traffic Commissioners to place items on the agenda for discussion at the next scheduled Traffic Commission meeting. Vice Chair Patel requested that City staff place on the January 17, 2024 agenda: “Studying a Change to the Residential Permit Parking Program that Would Reduce Guest Permit
7.2.2 Packet Pg. 298
Studying a Change to the Residential Permit Parking Program March 12, 2024
Parking Passes from Four Permits to One Permit per Household.” Based upon the meeting discussion, Vice Chair Patel is specifically interested in limiting the number of permits per household because, in his view, the number of issued permits does not appreciably reduce the number of vehicles parked overnight on streets enrolled in the Residential Permit Parking Program. Therefore, Vice Chair Patel suggested that limiting the number of parking permits and guest passes would be beneficial. He also suggested that any changes to the Residential Permit Parking Program should apply retroactively to already approved permit parking areas.
City staff recommends that the City Council provide direction to the City Attorney on this request as the work may require significant research, especially the request to research the feasibility of retroactively applying program changes to the already approved permit parking areas. A concern is that the petitions signed by the residents included a list of programmatic elements of the Residential Permit Parking Program, which may have influenced residents’ decisions to enroll in the permit parking program.
FISCAL IMPACT:
Unknown.
7.2.2 Packet Pg. 299
City of Laguna Hills
City Council/Planning Agency
Staff Report
DATE: March 12, 2024
TO: Mayor and Council Members
FROM: Jennifer Lee
City Clerk
ISSUE: Committee Assignment Reports
RECOMMENDATION: That the City Council receive reports from City Council Members on the City Council Committee Assignments listed in the staff report.
SUMMARY:
The following are recent meetings and events attended by the City Council for their City Council Committee Assignments. It is order to receive a report from the Council Members listed below on their Committee Assignment(s).
1 Southern California Association of Governments (SCAG) Council Member Caskey