Don Caskey
Mayor
Jared Mathis
Mayor Pro Tempore
Erica Pezold
Council Member
Joshua Sweeney
Council Member
Dave Wheeler
Council Member
City of Laguna Hills
City Council / Planning Agency
Regular Meeting Agenda
Tuesday, September 8, 2026 - 6:00 PM
(Closed Session Starts at 5:00 p.m.)
City Council Chamber
24035 El Toro Road
Laguna Hills, CA 92653
In Person Public Comments: Any person wishing to address the City Council/Planning Agency on any matter, whether or not it appears on this Agenda, is asked to complete a pink “Request to Speak” form available on the table at the back of the Chamber and submit the form to the City Clerk. The Request to Speak form assists the Mayor in ensuring that all persons wishing to address the City Council are recognized and ensures accurate identification of meeting participants in the City Council/Planning Agency Minutes.
Completion of the form is voluntary. It is City policy to limit public testimony to up to three (3) minutes per person, as determined by the Mayor, for Public Comments. If you are commenting on an Agenda item, your comments will be heard at the time that item is scheduled on the Agenda. If you are addressing the City Council on an item not listed on the Agenda, the City Council is prohibited by law from discussing or taking any action on that item.
Submission of Electronic Public Comments: Those wishing to make electronic public comments may submit their comments by email to the City Clerk no later than two (2) hours prior to the start of the meeting on September 8, 2026. In the subject line of the email, please state your name and the item number you are commenting on. Any public comment received that does not specify a particular agenda item number will be announced during the general public comment portion of the agenda. All comments received by the deadline on the date of the meeting will be provided to the City Council and will be provided for public inspection at the meeting. During the applicable agenda item, the City Clerk will announce the name of the sender and subject matter of all electronic comments received by the deadline on September 8, 2026. Email comments will NOT be read by the City Clerk during the meeting. Electronic public comments may only be submitted via email and comments via text and social media (Facebook, X (formerly Twitter), etc.) will not be accepted.
Remote Online Public Comments: Any person wishing to address the City Council/Planning Agency on any matter, whether or not it appears on this Agenda, can do so via two-way telephonic service by calling the number below and entering the meeting ID and passcode. When participating via two-way telephonic service, follow the instructions below to indicate you wish to speak during the meeting. It is City policy to limit public testimony to up to three (3) minutes per person, as determined by the Mayor, for Public Comments. You will be asked to raise your hands via *9. When recognized by the City Clerk using the last four (4) digits of your phone number, unmute your microphone by pressing *6 (Staff will grant permission) and provide comments. At the conclusion of your time, your ability to unmute will be removed by the Host. Remote participants must be present when called and are responsible for ensuring that they are connected and able to hear the meeting.
Two-way Telephonic Service Information:
Telephone Number: 669-444-9171 or 253-215-8782
Meeting ID: 858 5938 2799
Passcode: 92653
Please be mindful that the meeting will be recorded and all rules of decorum apply for inperson and virtual attendees.
For questions or assistance, please contact the City Clerk’s Office at (949) 707-2635 or via email.
Closed Session - Convening at 5:00 PM
Call to Order
Resolution No. 96-04-09-1 established rules of decorum for public meetings held by the City of Laguna Hills. Resolution No. 96-04-09-1 is available on the table at the back of the City Council Chamber.
Roll Call of City Council Members
Announcement of Closed Session Item(s)
A. Conference with Legal Counsel - Anticipated Litigation Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section 54956.9: (1 potential case)
Public Comments on Closed Session Item(s)
Members of the public may address the City Council only on closed session items listed on this Agenda. Public Comments are limited to three
minutes per person, as determined by the Mayor.
Convene into Closed Session
Reconvene
Recess
General Business Convening at 6:00 PM
Call to Order
Resolution No. 96-04-09-1 established rules of decorum for public meetings held by the City of Laguna Hills. Resolution No. 96-04-09-1 is available on the table at the back of the City Council Chamber.
Invocation: Elder Bill Smith of Christ Community Church Pledge of Allegiance: Councilmember Sweeney
Roll Call of City Council Members
1. Presentations and Proclamations
1.1 Appointment of Laguna Hills High School Student Liaisons and Alternate Student Liaisons
Recommendation: That the City Council presents Certificates of Appointment to the Laguna Hills High School Liaisons.
1.2 Laguna Hills High School Student Liaison Report
Recommendation: That the City Council receive a report from the Laguna Hills High School Student Liaison.
1.3 Hunger Action Month Proclamation
Recommendation: That the City Council issue a Proclamation declaring September as Hunger Action Month.
2. Schedule of Future Events
2.1 Schedule of Future Events
Recommendation: That the City Council receive the schedule of upcoming meetings and events from the Community Services Director.
3. Public Comments
This is the time to address the City Council on any matter not listed on this Agenda that is within the subject matter jurisdiction of the City Council. Public Comments are limited to three minutes per person, as determined by the Mayor.
4. Consent Calendar
All matters listed under “CONSENT CALENDAR” are considered to be routine and will be enacted by one motion approving the recommendation listed on the Agenda. There will be no separate discussion unless Members of the City Council or City staff request specific items be removed from the Consent Calendar.
4.1 Waive Reading in Full of all Ordinances and Resolutions on the Agenda
Recommendation: That the City Council waive reading in full of all ordinances and resolutions on the agenda and declare that said titles which appear on the public agenda shall be determined to have been read by title and further reading waived.
4.2 Approval of the Minutes for the August 25, 2026, Regular Meeting Recommendation: That the City Council approve the City
Council/Planning Agency Minutes for the August 25, 2026, Regular Meeting.
4.3 Ratification of September 8, 2026 Warrant Register
Recommendation: That the City Council ratify the accompanying Warrant Register for the period from August 14, 2026, to August 27, 2026, in the amount of $437,649.11.
4.4 Authority to Advertise for Construction, FY 2026-2027 Community Development Block Grant Curb Ramp Improvement Project, CIP 170
Recommendation: That the City Council: 1. Approve the plans and specifications for the FY 2026-2027 Community Development Block Grant Curb Ramp Improvement Project, CIP 170; 2. Authorize the advertisement for bids for FY 2026-2027 Community Development Block Grant Curb Ramp Improvement Project, CIP 170; 3. Authorize the City Engineer to make minor edits to the plans and specifications as necessary prior to bidding; and 4. Find that environmental review is not required under the California Environmental Quality Act (CEQA) pursuant to the California Code of Regulations, Title 14, Chapter 3,
Section 15301 as a Class 1 Categorical Exemption - “Existing Facilities."
4.5 Amendment No. 1 to Professional Services Agreement with Advantec Consulting Engineers, Inc. for Regional Traffic Signal Synchronization Program for Avenida de la Carlota
Recommendation: That the City Council: 1. Approve Amendment No. 1 to Professional Services Agreement with Advantec Consulting Engineers, Inc. for Regional Traffic Signal Synchronization Program for Avenida de la Carlota; 2. Authorize the City Attorney to make minor modifications as may be necessary to execute the Amendment; and 3.
Authorize the City Manager to sign the Amendment.
Items Removed from the Consent Calendar
5. Administrative Reports
5.1 City Manager
5.2 Assistant City Manager
5.2.1 Proposed Resolution Implementing a Residential Permit Parking Program for Streets Around Beckenham Park
(Camberwell Street, Hendon Street, Calle Carmel, Via Balboa, Avenida Avalon, Luton Street, and Costeau Street)
Recommendation: That the City Council: 1. Find and determine that the proposed permit parking controls are not subject to the California Environmental Quality Act pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, Cal. Code of Regs, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly; 2. Adopt a Resolution entitled, "A Resolution of the City Council of the City of Laguna Hills, California, Establishing a Residential Permit Parking Area and a No Parking Zone During Days and Hours of Street Sweeping on Certain Streets around Beckenham Park;" 3.
Receive and file a presentation from City staff regarding the costs and steps required to implement alternating side street sweeping, subsidize residential parking permits citywide, and process to petition for additional permit parking areas; 4. Direct City staff and Police Services to send educational notification letters to residents within the newly established residential permit parking area and to conduct a warning period for enforcement; and 5. Direct City staff
to return to City Council in approximately six months with a staff report reviewing the effects of residential permit parking around Beckenham Park.
5.2.2 Discussion of Parking on the North Side of Laguna Hills Drive between Indian Hill Lane and Paseo de Valencia
Recommendation: That the City Council provide direction to City staff.
5.3 Chief of Police Services
5.3.1 Public Safety Update
Recommendation: That the City Council receives and files the report.
6. City Council Member Committee Reports
6.1 Committee Assignment Reports
Recommendation: That the City Council receive reports from the City Councilmembers on the City Council Committee Assignments listed on the attachment.
7. City Council Member Comments
Adjournment
The next Regular Meeting of the City Council/Planning Agency will be September 22, 2026, at 6:00p.m., in the City Council Chamber, located at 24035 El Toro Road, Laguna Hills, California.
CERTIFICATION
I, JOSHUA STEVENSON, City Clerk of the City of Laguna Hills, do hereby certify that a copy of the foregoing Agenda was posted at Laguna Hills City Hall, Laguna Hills Community Center, and Knotty Pine Park by September 3, 2026, at 5:00p.m.
It is the intention of the City of Laguna Hills to comply with the Americans with Disabilities Act in all respects. If as an attendee or a participant at this meeting you will need special assistance beyond what is normally provided, the City of Laguna Hills will attempt to accommodate you in every reasonable manner.
Please contact the office of the City Clerk at (949) 707-2635. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to assure accessibility to this meeting.
Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda packet are available for public inspection in the City Clerk’s Office at 24035 El Toro Road, Laguna Hills, California, during normal business hours. In addition, such writings or documents will be made available for public review on the Agenda and Minutes public portal website and at the respective public meeting.
City Council Members receive no additional compensation or stipend as a result of simultaneously convening meetings of the Laguna Hills Planning Agency.
Item No. 1.1
City of Laguna Hills
City Council / Planning
Agency
Staff Report
Date: September 8, 2026
To: Mayor and Council Members
From: Joshua Stevenson, City Clerk
Issue: Appointment of Laguna Hills High School Student Liaisons and Alternate Student Liaisons
Recommendation: That the City Council presents Certificates of Appointment to the Laguna Hills High School Liaisons.
Background:
By action of the City Council on July 27, 1993, the City of Laguna Hills and Laguna Hills High School established a Student Liaison Program to create a direct link between Laguna Hills High School and the City Council. The Laguna Hills High School Parent, Teacher, and Student Association (PTSA) chooses two students each year to serve as Student Liaisons and two students to serve as the Alternate Student Liaisons.
The students chosen this year are Olivia Huang, Marissa Allen, Daniel Markevich, and Sophia Kim.
The City Clerk met with the chosen liaisons before the meeting to administer the Oath of Office.
Fiscal Impact:
There is no fiscal impact associated with the student liaison program.
Attachments:
1. 20260908_Certificates_Cert. of Appointment_2026 Student Liaisons
July 22, 2026
Dear Mayor Caskey,
Many of our Orange County neighbors experience food and nutritional insecurity on a regular basis. The high cost of living here in Orange County causes many working families to still struggle to put food on the table.
Hunger Action Month is a national effort to raise awareness of the levels of food and nutritional insecurity in our communities and to inspire the public to take action. We appreciate your consideration to recognize and designate September as Hunger Action Month (HAM) in Laguna Hills. We have included a sample proclamation template for your city staff, if helpful.
If you are able to recognize Hunger Action Month in the city of Laguna Hills, we would welcome the opportunity for a member of the OC Hunger Alliance to come to council for the recognition and to say a few short words highlighting the occasion.
Thank you for your continued support of hunger issues here in Orange County.
On behalf of the OC Hunger Alliance,
Mark Lowry Mike Learakos
Director, Orange County Food Bank CEO, Abound Food Care
Claudia Bonilla Keller
CEO, Second Harvest Food Bank of Orange County
Item No. 2.1
City of Laguna Hills
City Council / Planning Agency
Staff Report
Date: September 8, 2026
To: Mayor and Council Members
From: Holland Gannon, Community Services Director
Issue: Schedule of Future Events
Recommendation: That the Community Services Director announce the upcoming meetings and events.
Meetings:
Events, Communication, and Beautification Regular Meeting Monday, September 14th, 10:00 a.m., Laguna Hills Civic Center Admin Conference Room Traffic Commission Regular Meeting
Wednesday, September 16th, 6:00 p.m., Laguna Hills Civic Center Council Chamber City Council/Planning Agency Regular Meetings
Tuesday, September 22nd, 6:00 p.m., Laguna Hills Civic Center Council Chamber Tuesday, October 13th, 6:00 p.m., Laguna Hills Civic Center Council Chamber Events:
Excursion to California Botanic Garden
Wednesday, September 9th, 11:30 a.m. – 7:00 p.m., meet at Laguna Hills Community Center Let’s Make Workshop
Wednesday, September 9th, 4:00 p.m., Laguna Hills Community Center Classroom Excursion and Bonfire at Huntington Beach
Friday, September 11th, 3:00 p.m. – 10:00 p.m., meet at Laguna Hills Community Center Global Harmony Symphony: ‘Moment Musicale’ Zola Trio
Tuesday, September 15th, 1:00 p.m., Laguna Hills Community Center Heritage Room
Item No. 2.1
California Coastal Cleanup Day
Saturday, September 19th, 9:00 a.m.-12:00 p.m., Laguna Hills Community Center Excursion to a Hindu Temple
Saturday, September 19th, 12:30 p.m. – 7:00 p.m., meet at Laguna Hills Community Center Excursion to Solvang’s Danish Days
Sunday, September 20th, 7:00 a.m. – 7:00 p.m., meet at Laguna Hills Community Center Harvest in the Hills
Saturday, October 10th, 4:00 p.m. – 6:00 p.m., Laguna Hills Community Center Town Green Circle of Friends Halloween Dance
Friday, October 16th, 6:00 p.m. – 8:00 p.m., Laguna Hills Community Center Heritage Room Attachments:
1. Event and Activities Flyer(s)
collections showcasing the state’s diverse ecosystems, including chaparral, oak woodlands, deserts, and coastal sage scrub. This peaceful setting highlights California’s remarkable plant diversity while offering scenic walking paths and opportunities for nature observation at the Laguna Hills Community Center where City staff will provide transportation to the trailhead. No refunds or transfers for this event. *Registration starts on August 10, 2026 Class# 2608
9/9 11:30AM-7:00PM Wednesday
Fee: Resident $20, Non-Resident $25
Like us on at www.facebook.com/lagunahillscc
To register or for more information, please call (949) 707-2680 or visit www.lagunahillsca.gov
Excursion to California Botanic Garden
Enjoy a relaxing coastal outing at Huntington Beach State Park, combining a scenic beach day with a classic sunset bonfire. Take time to walk the shoreline, enjoy ocean views, and unwind by the waves before gathering around the fire as the sun sets over the Pacific. Participants can roast marshmallows, share food and stories, and take in the sounds of the ocean in a warm, social setting. Please bring blankets or beach chairs, layered clothing for cooler evenings, water, snacks or bonfire food items, and comfortable shoes for walking on the sand. Participants meet at the Laguna Hills Community Center where City staff will provide transportation. Call (949) 707- 2680 for more information. No refunds or transfers for this event.
*Registration starts on August 10, 2026 Class# 2609
9/11 3:00PM-10:00PM Friday
Fee: Resident $15, Non-Resident $20
Like us on at www.facebook.com/lagunahillscc
To register or for more information, please call (949) 707-2680 or visit www.lagunahillsca.gov
Excursion and Bonfire at Huntington Beach
Visit the beautiful BAPS Shri Swaminarayan Mandir, a traditional Hindu temple known for its stunning hand-carved stone architecture and peaceful surroundings. This excursion offers a chance to explore Hindu culture, spirituality, and craftsmanship while walking through the ornate temple complex and learning about its traditions. Visitors can also enjoy authentic vegetarian food available at the on-site cafeteria and browse items at the grocery store. The experience combines cultural discovery, reflection, and a taste of traditional Indian cuisine in a serene setting. Participants meet at the Laguna Hills Community Center where City staff will provide transportation. Call (949) 707-2680 for more information. No refunds or transfers for this event.
*Registration starts on August 10, 2026 Class# 2610
9/19 12:30PM-7:00PM Saturday
Fee: Resident $15, Non-Resident $20
Like us on at www.facebook.com/lagunahillscc
To register or for more information, please call (949) 707-2680 or visit www.lagunahillsca.gov
Excursion to Indian Temple
Join us as we travel via van to Solvang to celebrate California’s premier Danish heritage festival. Danish Days celebrates Solvang’s heritage with authentic food, music, dancing, parades, live entertainment and family activities. The 2026 Solvang Danish Days theme is "Solen over dalen," which translates to "Sun over the Valley". The event marks the 89th year of this beloved, annual cultural celebration. Bring a sack lunch or purchase while exploring Solvang. Be sure to dress in layers, bring plenty of water, and wear good footwear. Participants meet at the Laguna Hills Community Center where City staff will provide transportation. Call (949) 707-2680 for more information. No refunds or transfers for this event. *Registration starts on August 10, 2026 Class# 2611
9/20 7:00AM-7:00PM Sunday
Fee: Resident $35, Non-Resident $40
Like us on at www.facebook.com/lagunahillscc
To register or for more information, please call (949) 707-2680 or visit www.lagunahillsca.gov
Excursion to Solvang’s Danish Days
Harvest
I N THE Hills
ENTERTAINMENT-FOOD-FUN
October10,2026
25555ALiciaPkwy ~ Eventstartsat4pm
Join the City of Laguna Hills on the Town Green for an
evening filled with fall fun and family friendly activities. 4PM-6PM: Community partners expo, crafts, backyard
games, face painting, and more
4:15PM/4:30PM/4:45PM: Polly’s Apple Pie Eating Contest
5PM-6PM: Magic Show at the Gazebo
Food will be available for purchase
Join the City of Laguna Hills on the Town Green for an
evening filled with fall fun and family friendly activities. 4PM-6PM: Community partners expo, crafts, backyard
games, face painting, and more
4:15PM/4:30PM/4:45PM: Polly’s Apple Pie Eating Contest
5PM-6PM: Magic Show at the Gazebo
Food will be available for purchase
HALLOWEEN DANCE
C I R C L E O F F R I E N D S
16 O C T A T
6 PM
2 5 5 5 5 A L I C I A P K W Y
L A G U N A H I L L S , C A 9 2 6 5 3
L A G U N A H I L L S C A . G O V
F R E E
E V E N T
R E G I S T E R
O N L I N E
D I N N E R
T R E A T S
D A N C I N G
R E F R E S H M E N T S
MINUTES
City Council / Planning Agency Regular Meeting
Tuesday, August 25, 2026
A Regular Meeting of the City Council / Planning Agency of the City of Laguna Hills, California, was called to order by Mayor Caskey at 6:00 p.m., on August 25, 2026, in the City Council Chambers at 24035 El Toro Road, Laguna Hills, California.
A complete copy of the agenda for the meeting containing all items as shown herein was posted by 5:00 p.m. on August 21, 2026, on the outdoor bulletin board at Laguna Hills City Hall. A copy was also posted at Laguna Hills Community Center and Knotty Pine Park.
Call to Order
Mayor Caskey called the meeting to order at 6:00 p.m. upon determining a quorum of the Council was present.
Invocation: Elder Jeff Anderson of Christ Community Church Mayor Caskey called for the Invocation. The Invocation was given by Elder Jeff Anderson of Christ Community Church.
Pledge of Allegiance: Councilmember Pezold
Mayor Caskey called for the Pledge of Allegiance. The Pledge was led by Councilmember Pezold.
Roll Call of City Council Members
Present: Mayor Don Caskey
Mayor Pro Tempore Jared Mathis
Council Member Erica Pezold
Council Member Joshua Sweeney
Council Member Dave Wheeler
Absent: None
Mayor Caskey called for the following item out of order.
5. Administrative Reports
5.3 Community Services Director
5.3.1 Proposed Update to the City of Laguna Hills Banner Program Recommendation: That the City Council discuss the provided Street Pole Banner options and provide direction to Staff.
Mayor called for the item
Director Holland gave the staff report
Principal of Laguna Hills High School spoke regarding this item.
Council, Staff, and Principal had discussion regarding this item.
Mayor Pro Tem Mathis moved to approve proposal option #3. Seconded by Councilmember Sweeney.
Councilmember Pezold made a substitute motion to approve option #3 and for the City to work with the School to create a program to have parents help pay for the program.
The motion did not receive a second. The motion died on the floor.
A motion to approve Proposed Option #3 was moved by Mayor Pro Tempore Mathis, seconded by Council Member Sweeney.
Result:
Yes 5, No 0, Abstained 0
Ayes: Pezold, Wheeler, Caskey, Sweeney, Mathis
Nays: None
Abstain: None
1.1 Wildfire Awareness and Prevention Season Proclamation Recommendation: That the City Council issue a Proclamation declaring midsummer to early autumn as "Wildfire Awareness and Prevention Season" and that Mayor Caskey present the Proclamation to Reid Gibson, Division Chief, Orange County Fire Authority.
Mayor called for the item.
Mayor Pro Tem Mathis read the proclamation
Mayor Caskey declared mid-summer to early autumn as Wildfire Awareness and Prevention Season.
Chief Gibson spoke regarding this item. An OCFA educator spoke regarding this item.
Council Members Pezold and Sweeney spoke regarding this item.
1.2 El Toro Road/Interstate 5 Interchange Project Update City Attorney Burns recused himself due to a conflict of interest Mayor called for this item.
Representatives of OCTA gave the presentation.
Council and the representatives from OCTA had discussion regarding this item.
No action was taken regarding this item.
2. Schedule of Future Events
2.1 Schedule of Future Events
Mayor Caskey called for the Schedule of Future Events.
Community Services Director Gannon presented the Schedule of Future Events.
3. Public Comments
Mayor Caskey called for Public Comments on items not on the agenda.
YiNing Wang spoke regarding the Massage Establishments Moratorium and her business.
5. Administrative Reports
5.2 Assistant City Manager
5.2.1 Review of Petitions Received Regarding the Establishment of Proposed Residential Permit Parking District(s) for Camberwell Street, Hendon Street, Calle Carmel, Via Balboa, Avenida Avalon, Luton Street, Costeau Street, Salford Street, Derby Circle, York
Circle, Sunset Place West, Sunset Place East, and Sunset Place Recommendation: That the City Council discuss and provide direction on a proposed residential permit parking district.
Mayor Caskey called for this item.
Assistant City Manager Ames presented the staff report.
Mayor Caskey called for public comment on this item.
Curtis Van Buskirk spoke in favor of this item.
Staff answered the Council's questions.
Councilmember Sweeney motioned to direct staff to return with a plan using alignment 5A and the following: 1) that Staff return with an equitable citywide option for the city to absorb the cost of the standard resident and guest permits; 2) an alternating side or staggered street sweeping schedule that preserves necessary service; 3) an evaluation of additional overnight parking on the north side of Laguna Hills Drive; 4) a resident education and warning period before citations; 5) a process for monitoring displaced parking and allowing adjoining streets to petition for inclusion; and 6) a six-month review of effectiveness, enforcement, resident concerns, and unintended consequences. The motion was seconded by Mayor Pro Tem Mathis.
A motion to approve staff's recommendation of 5A and six other points was moved by Council Member Sweeney, seconded by Mayor Pro Tempore Mathis.
Result:
Yes 5, No 0, Abstained 0
Ayes: Sweeney, Pezold, Mathis, Wheeler, Caskey
Nays: None
Abstain: None
4. Consent Calendar
Mayor Caskey called for the Consent Calendar.
Councilmember Wheeler requested the following items to be considered
individually: 4.6, 4.7, 4.8, 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.19.
A motion to approve the remaining Consent Calendar was moved by Council Member Sweeney, seconded by Council Member Pezold.
Result:
Yes 5, No 0, Abstained 0
Ayes: Mathis, Pezold, Caskey, Wheeler, Sweeney
Nays: None
Abstain: None
4.1 Waive Reading in Full of all Ordinances and Resolutions on the Agenda Waived reading in full of all ordinances and resolutions on the agenda and declared that said titles which appear on the public agenda shall be determined to have been read by title and further reading waived.
4.2 Approval of Minutes for July 14, 2026, Special Meeting Approved the City Council/Planning Agency Minutes for the July 14, 2026, Special Meeting.
4.3 Approval of Minutes for July 14, 2026, Regular Meeting Approved the City Council/Planning Agency Minutes for the July 14, 2026, Regular Meeting.
4.4 Approval of Minutes for August 19, 2026, Special Meeting Approved the City Council/Planning Agency Minutes for the August 19, 2026, Special Meeting.
4.5 Ratification of August 25, 2026 Warrant Register
Ratified the accompanying Warrant Register for the period from July 3, 2026, to August 13, 2026, in the amount of $5,323,199.96.
4.9 Approval of Amended Memorandum of Understanding with SDRMA for Employee Health Insurance Program
Approved the Resolution authorizing continued participation in SDRMA's Health Insurance Program and authorize City Staff to sign the amended Memorandum of Understanding.
4.18 City's Conflict of Interest Code Update
Adopted a Resolution entitled: "A Resolution of the City Council of the City of
Laguna Hills, California, Adopting an Updated Conflict of Interest Code and Rescinding Resolution No. 2024-08-27-2"
Items Removed from the Consent Calendar
Mayor Caskey recessed the meeting at 8:28 p.m.
Mayor Caskey reconvened the meeting at 8:37 p.m.
4.6 Treasurer's Investment Report for June 2026
Recommendation: That the City Council receive and file the Treasurer's Investment Report for the month of June 2026.
Mayor Caskey called for this item.
Councilmember Wheeler spoke regarding this item.
Staff answered Council’s questions.
A motion to approve staff's recommendation was moved by Council Member Wheeler, seconded by Council Member Pezold.
Result:
Yes 5, No 0, Abstained 0
Ayes: Mathis, Sweeney, Caskey, Wheeler, Pezold
Nays: None
Abstain: None
4.7 Treasurer's Investment Report for July 2026
Recommendation: That the City Council receive and file the Treasurer's Investment Report for the month of July 2026.
Mayor Caskey called for this item.
A motion to Approve staff's recommendation was moved by Council Member Wheeler, seconded by Council Member Pezold.
Result:
Yes 5, No 0, Abstained 0
Ayes: Mayor Pro Tempore Mathis, Council Member Wheeler, Council Member Sweeney, Council Member Pezold, Mayor Caskey
Nays: None
Abstain: None
4.8 Informal Bidding Ordinance Use Quarterly Report for Public Works Projects
Recommendation: That the City Council receive and file the report.
Mayor Caskey called for this item.
A motion to Approve staff's recommendation was moved by Council Member Wheeler, seconded by Council Member Sweeney.
Result:
Yes 5, No 0, Abstained 0
Ayes: Mayor Pro Tempore Mathis, Council Member Sweeney, Council Member Pezold, Mayor Caskey, Council Member
Wheeler
Nays: None
Abstain: None
4.10 2026 Holiday Lighting and Decorations Agreement with Shine Creations LLC (formerly The Christmas Kings)
Recommendation: That the City Council: 1) Waive competitive formal bidding requirements and procedures set forth in the City of Laguna Hills Municipal Code (LHMC) Section 3-08.090 with regard to approval of the proposed Holiday Lighting and Decorations Agreement with Shine Creations LLC (formerly The Christmas Kings,) as it is hereby found and determined, pursuant to LHMC Section 3-08.110, that the recommended contract is for entertainment services and community support; and 2) Approve the proposed Holiday Lighting and Decorations Agreement and authorize the City Manager to execute the Agreement.
Mayor Caskey called for this item
Councilmember Wheeler and Pezold spoke regarding this item.
Council and Staff had discussion regarding this item.
A motion to approve staff's recommendation and direct Staff to work with Mayor Caskey regarding the decorations with the authorization to utilize the
entire line item budget was moved by Council Member Wheeler, seconded by Council Member Pezold.
Result:
Yes 5, No 0, Abstained 0
Ayes: Wheeler, Caskey, Mathis, Pezold, Sweeney
Nays: None
Abstain: None
4.11 2026 Holiday Event Series Pre-Event Report
Recommendation: That the City Council receive and file the 2026 Holiday Event Series Pre-Event Report.
Mayor Caskey called for this item.
Councilmember Pezold spoke regarding this item.
Council had discussion regarding this item.
A motion to approve staff's recommendation was moved by Council Member Wheeler, seconded by Mayor Pro Tempore Mathis.
Result:
Yes 5, No 0, Abstained 0
Ayes: Mathis, Caskey, Wheeler, Pezold, Sweeney
Nays: None
Abstain: None
4.12 License Agreement with SOCAL Counseling Services for 24031 El Toro Road, Suite 250D
Recommendation: That the City Council: 1. Approve of the license agreement; and 2. Authorize the City Manager to sign the license agreement.
Mayor Caskey called for this item.
Staff answered Council’s questions.
A motion to approve staff's recommendation was moved by Council Member
Wheeler, seconded by Mayor Pro Tempore Mathis.
Result:
Yes 5, No 0, Abstained 0
Ayes: Council Member Wheeler, Mayor Pro Tempore Mathis, Council Member Sweeney, Council Member Pezold, Mayor Caskey
Nays: None
Abstain: None
4.13 Laguna Hills-Laguna Woods El Toro Road and Moulton Parkway Traffic Signal Interconnect Conduit License Agreement
Recommendation: That the City Council: 1. Approve of the Laguna HillsLaguna Woods El Toro Road and Moulton Parkway Traffic Signal Interconnect Conduit License Agreement; 2. Authorize the City Attorney to make minor edits as may be necessary to execute the Agreement; and 3. Authorize the City Manager to execute the Agreement.
Mayor Caskey called for this item.
Councilmember Wheeler spoke regarding this item.
Staff answered Council’s questions.
A motion to approve staff's recommendation was moved by Council Member Wheeler, seconded by Council Member Sweeney.
Result:
Yes 5, No 0, Abstained 0
Ayes: Wheeler, Pezold, Sweeney, Mathis, Caskey
Nays: None
Abstain: None
4.14 Approval of an Ordinance Adopting the Urban Village Specific Plan Amendment to Modify Permitted Uses, Development Standards, and Applicability of the City's Objective Design Standards
Recommendation: That the City Council adopt an Ordinance entitled: "An Ordinance of the City Council of the City of Laguna Hills, California, Approving and Adopting the Urban Village Specific Plan Amendment to Modify Permitted Uses, Development Standards, and Applicability of the City's Objective Design Standards."
Mayor Caskey called for this item.
Staff answered Council’s questions.
Council had discussion regarding this item.
A motion to approve staff's recommendation was moved by Council Member Wheeler, seconded by Council Member Sweeney.
Result:
Yes 4, No 1, Abstained 0
Ayes: Mathis, Sweeney, Wheeler, Caskey
Nays: Pezold
Abstain: None
4.15 Approval of an Ordinance Adopting an Amended and Restated Development Agreement between the City of Laguna Hills and MGP Fund X Laguna Hills, LLC for the Village At Laguna Hills Project Recommendation: That the City Council adopt an Ordinance entitled: "An Ordinance of the City Council of the City of Laguna Hills, California, Approving and Adopting an Amended and Restated Development Agreement Between the City of Laguna Hills and MGP Fund X Laguna Hills, LLC for the Village at Laguna Hills Project.
Mayor Caskey called for this item.
Mayor Caskey called for public comments.
Bruce Johnson spoke in favor.
Cathy Udovch spoke in favor.
City Clerk read the names of online comments that were submitted for this item.
Comments in favor:
1. Michaela Nozaki
2. Kathy Temple
3. Christine Morinello
4. Barbara Siry
5. Jeffrey Gothard
6. Holly Magana
7. Judy Northrop
8. Bruce Johnson
9. Rayna Hamre
10. Laura Shapiro
11. Carol McVay
12. Vicki Hines
13. Marcella Lawson
14. Ann Beltran
15. Sayre Weaver
16. Rona Henry
17. David Salahi
18. Alice Soto
19. John Mendonca
20. Keith Tuominen
21. Wendy Washington
22. Cesar Covarrubias
Council Members Wheeler and Pezold spoke regarding this item.
Council had discussion regarding this item.
A motion to approve staff's recommendation was moved by Mayor Caskey, seconded by Mayor Pro Tempore Mathis.
Result:
Yes 3, No 1, Abstained 0, Refusal to Vote 1
Ayes: Sweeney, Caskey, Mathis
Nays:
Abstain:
Pezold
None
Refusal
to Vote:
Wheeler
4.16 Approval of an Ordinance Adopting Zoning Text Amendment and Zoning Map Amendment No. RZNE-0014-2026, (10 A Text Amendment to Title 9 (Zoning and Subdivisions) of the Laguna Hills Municipal Code to Implement the General Plan Housing Element by Amending Chapter 9-11 (Overlay Districts) to Implement the Amended Land Use Element by Renaming the Existing Housing (H) Overlay Zone to Housing 50 (H50) Overlay Zone and Introducing a New Housing 80 (H80) Overlay Zone; and (2) A Zone Change to Apply the Housing 50 (H50) Overlay Zone and Housing 80 (H80) Overlay Zone to 23501 - 23561 Ridge Route Drive (APN# 588-331-12), 25201 - 25241 Paseo De Alicia (APN# 620-221-42, 620-221-44, and 620-221-49), and to Additional Properties as Specified in the Proposed Ordinance
Recommendation: That the City Council approve an Ordinance entitled: "An Ordinance of the City of Laguna Hills, California, Adopting Zoning Text
Amendment and Zoning Map Amendment No. RZNE-0014-2026, (10 A Text Amendment to Title 9 (Zoning and Subdivisions) of the Laguna Hills Municipal Code to Implement the General Plan Housing Element by Amending Chapter 9-11 (Overlay Districts) to Implement the Amended Land Use Element by Renaming the Existing Housing (H) Overlay Zone to Housing 50 (H50) Overlay Zone and Introducing a New Housing 80 (H80) Overlay Zone; and (2) A Zone Change to Apply the Housing 50 (H50) Overlay Zone and Housing 80 (H80) Overlay Zone to 23501 - 23561 Ridge Route Drive (APN# 588-331-12), 25201 - 25241 Paseo De Alicia (APN# 620-221-42, 620-221-44, and 620-221-49), and to Additional Properties as Specified in the Proposed Ordinance" Mayor Caskey called for this item.
Councilmember Wheeler spoke regarding this item.
Council had discussion.
Mayor Caskey called for public comment.
Patrick Strader spoke in favor.
The City Clerk read the name of the one comment that was submitted online.
In favor: Cesar Covarrubias.
Council and Staff had discussion regarding this item.
A motion to approve staff's recommendation was moved by Mayor Pro Tempore Mathis, seconded by Council Member Sweeney.
Result:
Yes 3, No 2, Abstained 0
Ayes: Sweeney, Caskey, Mathis
Nays: Wheeler, Pezold
Abstain: None
4.17 Approval of an Ordinance Adopting RZNE-0015-2026 for the Inclusionary Housing Program by Adding Chapter 9-73 (Inclusionary Housing) of Title 9 (Zoning Code) of the Laguna Hills Municipal Code to Establish an Inclusionary Housing Program, Require the Provision of Affordable Housing in Certain Residential Developments, Establish an Inclusionary Housing Fund, Provide Alternative Methods of Compliance, and make
Findings Related Thereto
Recommendation: That the City Council approve an ordinance entitled: "An Ordinance of the City of Laguna Hills, California, Adopting RZNE-0015-2026 for the Inclusionary Housing Program by Adding Chapter 9-73 (Inclusionary Housing) of Title 9 (Zoning Code) of the Laguna Hills Municipal Code to Establish an Inclusionary Housing Program, Require the Provision of Affordable Housing in Certain Residential Developments, Establish an Inclusionary Housing Fund, Provide Alternative Methods of Compliance, and make Findings Related Thereto"
Mayor Caskey called for the item.
Councilmember Wheeler spoke regarding this item.
Mayor Caskey called for public comments regarding this item.
Bruce Johnson spoke in favor of this item.
Cathy Udovch spoke in favor of this item.
Patrick Strader spoke in neutrality on this item.
The City Clerk did not read the names of the of comments that were submitted online during the meeting. The names of individuals that submitted comments online have been listed below.
Comments in favor:
1. Barbara Siry
2. Lynn Cowan
3. Michaela Nozaki
4. Marie (no last name
give)
5. Maya Dunne
6. Christine Morinello
7. Suzanne Model
8. Ramesh C. Joshi
9. Kathy Temple
10. Holly Magana
11. Marilyn Schroeder
12. Rhett Kuseski
13. Bruce L. Johnson
14. Jo Ann Panitch
15. Laura Shapiro
16. Rayna Hamre
17. Carol McVay
18. Vicki Hines
19. Marcella Lawson
20. Sheryl Sterry
21. Ann Beltran
22. Debbie Salahi
23. Sayre Weaver
24. Rona Henry
25. Marie Tsaasan
26. Celia Young
27. John Mendonca
28. Wendy Washington
29. Patti Vaitaitis
30. Frieda Gorelick
32. Cesar Covarrubias.
A motion to approve staff's recommendation was moved by Mayor Caskey, seconded by Council Member Sweeney.
Result:
Yes 3, No 2, Abstained 0
Ayes: Sweeney, Caskey, Mathis
Nays: Wheeler, Pezold
Abstain: None
4.19 Development Application Status Report
Recommendation: That the City Council receive and file the report.
Mayor Caskey called for this item.
Councilmember Wheeler spoke regarding this item.
Council and Staff had discussion.
A motion to approve the staff’s recommendation was moved by Council Member Wheeler, seconded by Council Member Pezold.
Result:
Yes 5, No 0, Abstained 0
Ayes: Mathis, Pezold, Sweeney, Caskey, Wheeler
Nays: None
Abstain: None
5. Administrative Reports
5.1 City Manager
5.1.1 Approve a response to the 2025-2026 Orange County Grand Jury Report, "Wildfires Hit Home"
Recommendation: That the City Council approve a response to the 2025-2026 Orange County Grand Jury Report, "Wildfires Hit Home", authorize the Mayor to execute the response, and direct the City Manager to submit the response as required by applicable law.
Staff answered Council’s questions.
Council Member Sweeney made a motion to approve staff's recommendation and the following items: 1) to direct staff to identify the city position serving as the direct resident contact under Grand Jury Report Recommendation R4; 2) establish a resident facing wildfire information page or equivalent communication channel and return to the Council with the implementation of the update; and 3) evaluation of an appropriate community level risk reduction designation. The motion was seconded by Mayor Pro Tempore Mathis.
Result:
Yes 5, No 0, Abstained 0
Ayes: Wheeler, Sweeney, Caskey, Mathis, Pezold
Nays: None
Abstain: None
5.2 Assistant City Manager
5.2.2 Rejection of Bids for CIP 101-M: Citywide Local Street Rehabilitation Project
Recommendation: That the City Council: 1. Reject all Bid Proposals received for the Citywide Pavement Rehabilitation Project, CIP No. 101- M; and 2. Provide direction to City staff on the scope of the Citywide Pavement Rehabilitation Project for a second re-bidding.
Mayor Caskey called for this item.
Assistant City Manager Ames gave the staff report.
Staff answered Council’s questions.
Mayor Caskey made a motion to approve staff’s recommendation, direct staff to rebid the project with only a base bid, and to reauthorize the City to re-bid the project. Councilmember Sweeney seconded the motion.
Result:
Yes 4, No 0, Abstained 1
Ayes: Mathis, Wheeler, Caskey, Sweeney
Nays: None
Abstain: Pezold
5.2.3 Rejection of Bids and Authority to Re-Advertise for Construction, Park Improvements for Cabot Park, El Conejo Park, MacKenzie Park, San Remo Park, and Veeh Ranch Park, CIP 241
Recommendation: That the City Council: 1. Reject all Bid Proposals received for the Park Improvements for Cabot Park, El Conejo Park, MacKenzie Park, San Remo Park, and Veeh Ranch Park, CIP 241; 2.
Approve the revised plans and specifications for Park Improvements for Cabot Park, El Conejo Park, MacKenzie Park, San Remo Park, and Veeh Ranch Park, CIP 241; 3. Authorize the City Engineer to make modifications to the plans and specifications as may be necessary; and
4. Authorize the advertisement for bids for Park Improvements for Cabot Park, El Conejo Park, MacKenzie Park, San Remo Park, and Veeh Ranch Park, CIP 241.
Mayor Caskey called for this item.
Assistant City Manager Ames gave the staff report.
Staff answered Council’s questions.
A motion to Approve staff's recommendation was moved by Mayor Pro Tempore Mathis, seconded by Council Member Pezold.
Result:
Yes 5, No 0, Abstained 0
Ayes: Wheeler, Sweeney, Pezold, Mathis, Caskey
Nays: None
Abstain: None
5.4 Chief of Police Services
5.4.1 Public Safety Update
This item was not called. This item will be on the agenda for September 8, 2026.
6. Matters Agendized and Presented by City Council Members None
7. City Council Member Committee Reports
7.1 Committee Assignment Reports
Councilmember Pezold spoke regarding the Orange Council Mosquito and Vector Control District Board of Directors meeting.
Councilmember Wheeler spoke regarding the Orange County Older Adults Advisory Commission meeting.
8. City Council Member Comments
Councilmember Pezold spoke regarding a letter from a resident regarding a HOA flying drones.
Councilmember Sweeney thanked the Orange County Sherrif Department and Orange County Fire Authority. The Councilmember further clarified some comments made during meeting.
Adjournment
At the hour of 11:41 p.m., with no further business to come before the City Council/Planning Agency at this session, Mayor Caskey adjourned the meeting to Tuesday, September 8, 2026, at 6:00 p.m.
____________________________________
Joshua Stevenson, City Clerk
ATTEST:
____________________________________
Don Caskey, Mayor
Approved at meeting of September 8, 2026
Item No. 4.3
City of Laguna Hills
City Council / Planning
Agency
Staff Report
Date: September 8, 2026
To: Mayor and Council Members
From: Eric Hendrickson, Finance Director
Issue: Ratification of September 8, 2026 Warrant Register Recommendation: That the City Council ratify the accompanying Warrant Register for the period from August 14, 2026, to August 27, 2026, in the amount of $437,649.11.
Background:
The City issues accounts payable disbursements on a regular basis and presents it to the City Council for ratification at its next regularly scheduled City Council Meeting. The attached Warrant Register containing checks and electronic funds transfers for the period from August 14, 2026, to August 27, 2026, is being presented for ratification by the City Council. Payments have been reviewed and approved by the appropriate departmental staff. The Finance Director certifies to the accuracy of the attached register and to the availability of monies for payment thereof.
Fiscal Impact:
Ratification of the accompanying Warrant Register includes disbursements totaling $437,649.11.
Attachments:
1. Warrant Register - September 8, 2026
2. Payables Detail Report - September 8, 2026
Payment Amount
837.00
4,895.00
91.48 355.71
5,446.02
733.00
11,855.00
37,158.84
688.00
100.00
1,907.35
750.00
14,274.11
200.00
100.00
3,450.00
439.11
3,060.00
2,737.90
3,780.42
3,185.00
6,563.00
2,475.00
4,405.97
14,823.14
660.00
961.00
341.83
1,279.53
2,125.00
614.40
202.09
2,855.25
28.81 69,029.96
720.00
1,008.00
415.70
26,866.73
31,208.12
1,961.99
9,929.26
1,998.00
159.00
20,920.52
487.16
412.50
810.00
2,412.16
42,041.41
155.00
928.72
6,643.36
8/27/2026 7:20:47 PM Page 1 of 4
7188 S-2319 SCA OF CA, LLC 08/27/2026
7189 S-2296 SHUTE, MIHALY WEINBERGER LLP 08/27/2026
7190 S-2295 SOUTHERN COMPUTER WAREHOUSE 08/27/2026
7185 R-1977 RJ ELECTRIC 08/27/2026
7186 R-1806 RJM DESIGN GROUP, INC. 08/27/2026
7187 S-1902 SAN DIEGO GAS AND ELECTRIC 08/27/2026
7182 M-1302 MOULTON NIGUEL WATER DISTRICT 08/27/2026
7183 O-1613 ONTARIO REFRIGERATION SERVICE, INC. 08/27/2026 7184 P-1862 PSOMAS 08/27/2026
7179 J-1099 J & A GLASS 08/27/2026
7180 J-1057 JAMEY CLARK, INC. 08/27/2026
7181 L-1395 LIVING INTERIORS 08/27/2026
7176 E-0554 ECONOMICS, INC. 08/27/2026
7177 E-0504 EL TORO WATER DISTRICT 08/27/2026
7178 I-0960 IRV SEAVER MOTORCYCLES 08/27/2026
7173 C-1181 CIVICPLUS, LLC 08/27/2026
7174 C-1190 COUNTY OF ORANGE 08/27/2026
7175 D-0541 DIAMOND ENVIRONMENTAL SERVICES, LP 08/27/2026 7170 A-0359 ARDURRA GROUP, INC. 08/27/2026
7171 A-0365 AT&T 08/27/2026
7172 C-1144 CHARLES ABBOTT ASSOCIATES, INC 08/27/2026
7167 A-0377 ACTION WELDING CORP 08/27/2026
7168 A-0138 ALL CITY MANAGEMENT, INC. 08/27/2026
7169 A-0360 ARC DOCUMENT SOLUTIONS, LLC 08/27/2026
7164 Z-CD-0381 WESTERN ROOFING SYSTEMS 08/20/2026
7165 W-2455 WILLIAMS SCOTSMAN INC 08/20/2026
7166 A-0388 ABTECH TECHNOLOGIES, INC. 08/27/2026
7161 S-2060 SAN DIEGO NATURAL HISTORY MUSEUM 08/20/2026 7162 S-1904 SOUTHERN CALIFORNIA EDISON 08/20/2026
7163 S-2317 SWANK MOTION PICTURES, INC. 08/20/2026
7158 N-1487 NUVIS LANDSCAPE ARCHITECTURE 08/20/2026
7159 O-1617 OCY MANAGEMENT, LLC 08/20/2026
7160 R-1977 RJ ELECTRIC 08/20/2026
7155 L-1233 LSA ASSOCIATES, INC 08/20/2026
7156 M-1615 MOTION PICTURE LICENSING CORPORATION 08/20/2026 7157 M-1302 MOULTON NIGUEL WATER DISTRICT 08/20/2026
7152 Z-CS-0576 JACQUELINE ESQUIVEL 08/20/2026
7153 J-1057 JAMEY CLARK, INC. 08/20/2026
7154 J-1071 JCTEES.COM CORPORATION 08/20/2026
7149 F-0732 FIRE SAFETY FIRST, LLC 08/20/2026
7150 G-0877 GA TECHNICAL SERVICES, INC. 08/20/2026
7151 Z-CS-0577 I CAN ACADEMY OC 08/20/2026
7146 C-1021 CIVIC SOLUTIONS, INC. 08/20/2026
7147 Z-CS-0575 DAVID WINNICK 08/20/2026
7148 D-0541 DIAMOND ENVIRONMENTAL SERVICES, LP 08/20/2026 7143 B-0222 BILL'S SOUND AND SECURITY 08/20/2026
7144 C-1236 CAT TRACKING INC 08/20/2026
7145 C-1144 CHARLES ABBOTT ASSOCIATES, INC 08/20/2026
7140 A-0360 ARC DOCUMENT SOLUTIONS, LLC 08/20/2026
7141 A-0365 AT&T 08/20/2026
7142 B-0377 BIG TOP RENTALS 08/20/2026
Payment Type: Regular
7138 Z-CD-0383 ALL SERVICE ROOFING 08/20/2026
7139 A-0392 AQUATICO 08/20/2026
Warrant Register - September 8, 2026
City of Laguna Hills, CA By Check Number
Date Range: 08/14/2026 - 08/27/2026
Check Number Vendor Number Vendor Name Payment Date
Payment Amount
5,390.00
285.40
30,857.10
Total Regular: 388,019.05
8/27/2026 7:20:47 PM Page 2 of 4
7191 T-2717 TAIT & ASSOCIATES, INC 08/27/2026
7192 T-2712 TOTAL SOURCE OFFICEWORKS 08/27/2026
7193 W-2337 WEST COAST ARBORISTS, INC. 08/27/2026
Warrant Register - September 8, 2026 Date Range: 08/14/2026 - 08/27/2026 Check Number Vendor Number Vendor Name Payment Date
Payment Amount
7,952.00
41,678.06
91 58 0.00 437,649.11
8/27/2026 7:20:47 PM Page 3 of 4
Bank Drafts 19 2 0.00 49,630.06
EFT's 0 0 0.00 0.00
Manual Checks 0 0 0.00 0.00
Voided Checks 0 0 0.00 0.00
Total Bank Draft: 49,630.06
Bank Code 1 - General Summary
Payable
Count
Payment
Payment Type Count Discount Payment
Regular Checks 72 56 0.00 388,019.05
Payment Type: Bank Draft
DFT0003476 H-0966 HIGH LEVEL SECURITY SOLUTIONS, INC. 08/27/2026 DFT0003477 U-2170 US BANK CORPORATE PAYMENT SYSTEMS 08/17/2026 Warrant Register - September 8, 2026 Date Range: 08/14/2026 - 08/27/2026 Check Number Vendor Number Vendor Name Payment Date
998 Pooled Cash & Investments 8/2026 437,649.11
437,649.11
8/27/2026 7:20:47 PM Page 4 of 4
91 58 0.00 437,649.11
Fund Summary
Fund Name Period Amount
Bank Drafts 19 2 0.00 49,630.06
EFT's 0 0 0.00 0.00
Manual Checks 0 0 0.00 0.00
Voided Checks 0 0 0.00 0.00
All Bank Codes Check Summary
Payable
Count
Payment
Payment Type Count Discount Payment
Regular Checks 72 56 0.00 388,019.05
Warrant Register - September 8, 2026 Date Range: 08/14/2026 - 08/27/2026
Amount
8/27/2026 7:25:27 PM Page 1 of 8
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Target, Build-A-Fort 100-310-695500 86.35 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Panda Express, Build-A-Fort 100-310-695500 92.13 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Panda Express, Build-A-Fort 100-310-695500 92.13 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Ralphs, Build-A-Fort 100-310-695500 24.27 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Ralphs, Build-A-Fort 100-310-695500 39.53 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Target, Build-A-Fort 100-310-695500 64.65 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Descript Creator Subscription, 8/3/26 - 9/3/26
100-195-610000 35.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 The Home Depot, Build-A-Fort 100-310-695500 26.27 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Ralphs, Build-A-Fort 100-310-695500 12.48 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2811) 08.06.26 Ralphs 100-225-646100 150.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2811) 08.06.26 Chevron 100-225-646100 175.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 ChatGPT Subscription, 8/3/26 - 100-195-610000 20.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2811) 08.06.26 Intelius 100-225-610000 4.99
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2811) 08.06.26 Intelius 100-225-610000 4.99
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2811) 08.06.26 Intelius 100-225-610000 24.86
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 Paradise Drinking Waters 100-310-622000 328.95 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 CVS Pharmacy, Trophy Case Photos 100-310-695500 15.65 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 FlavorTrucks, Final Balance, 7/10/26 100-310-695512 455.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 Ralphs 100-310-622000 13.77
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 Target 100-310-622000 25.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 Ralphs 100-310-622000 26.77
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (0629) 08.06.26 Plumeria Cafe 100-310-622000 71.68 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (0629) 08.06.26 Canva, Giveaways Stickers 100-310-695000 258.60 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (1281) 08.06.26 Metricool, FY26-27 100-310-610000 540.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (0629) 08.06.26 JUUNO, Subscription, 7/14/26 -
8/14/26
100-310-610000 10.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (0629) 08.06.26 Women In Leisure Services, Banquet, 7/10/26
100-310-611000 45.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (0629) 08.06.26 Bird Dog Coffee 100-310-622000 21.07 Payables Detail Report
City of Laguna Hills, CA By Fund
Payment Dates 08/14/2026 - 08/27/2026
Payment Date Vendor Name Payable Number Description (Item) Account Number Fund: 100 - General Fund
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (0629) 08.06.26 ChatGPT, 7/13/26 - 8/13/26 100-310-610000 50.00
Amount
8/27/2026 7:25:27 PM Page 2 of 8
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 ChatGPT, Jul '26 100-355-610000 20.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Eventbrite, CEAOC, 8/3/26 100-355-611000 90.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Bushfire Kitchen 100-355-622000 146.66 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 FY25-26 Secure Live Scan, Jun '26 100-195-617000 105.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Microsoft 365 Subscription, 8/6/26 - 9/5/26
100-195-700090 37.80
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Microsoft 365, Audio Conferencing, FY26-27
100-195-700090 30.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Smart and Final 100-155-622000 307.32 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 BJs Restaurants 100-155-622000 408.51 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Amazon 100-155-622000 163.86
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Amazon 100-155-622000 40.93
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Amazon 100-155-622000 62.64
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Amazon 100-155-622000 84.70
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 ACC-OC, DC Advocacy Trip, 9/14/26 - 9/17/26
100-155-611000 2,700.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Amazon 100-155-622000 29.67
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 Amazon 100-155-622000 38.67
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4418) 08.06.26 Amazon 100-195-622000 580.56
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4418) 08.06.26 Amazon 100-195-622000 1,905.20
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (4849) 08.06.26 ChatGPT, 7/23/26 - 8/23/26 100-155-610000 20.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 SiteOne Landscape Supply, Irrigation 100-355-720700 8,796.65 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 Grainger 100-355-720701 109.24
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 Signarama Laguna Hills, Park Signs 100-355-720701 527.98 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 Devil Mountain Wholesale 100-355-720700 241.27 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 Smartlink, Sprinklers 100-355-720700 515.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 The Home Depot 100-355-720700 22.53 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 Chevron 100-355-646100 158.52
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 The Home Depot 100-355-720401 289.85 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (3165) 08.06.26 The Home Depot 100-355-720401 7.51 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 The Home Depot, Build-A-Fort 100-310-695500 134.80 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 The Home Depot, Build-A-Fort 100-310-695500 656.40 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 The Home Depot, Build-A-Fort 100-310-695500 2,220.97 Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026 Payment Date Vendor Name Payable Number Description (Item) Account Number 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 The Home Depot, Build-A-Fort 100-310-695500 122.55 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (2829) 08.06.26 Subway, Build-A-Fort 100-310-695500 129.98
Amount
8/27/2026 7:25:27 PM Page 3 of 8
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Exxon 100-310-646100 81.13
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Exxon 100-310-646100 96.69
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Amazon, Craft Supplies 100-310-695500 43.18 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (7241) 08.06.26 The Home Depot, Holiday Decor
Storage
100-355-720401 230.84
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (7941) 08.06.26 Deluxe For Small Business, Bank Deposit Books
100-155-623000 119.14
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Exxon 100-310-646100 52.78
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (7241) 08.06.26 Shell Oil 100-355-646100 161.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (7241) 08.06.26 The Home Depot 100-355-720401 40.89 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (7241) 08.06.26 The Home Depot, Credit 100-355-720401 (40.89) 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6976) 08.06.26 APA California, Conference, 10/3/26 - 10/6/26
100-225-611000 700.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6976) 08.06.26 Susan W. Case Inc., Parcel Maps 100-225-623000 2,340.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (7241) 08.06.26 Southland Auto Care 100-355-646100 2,229.01 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6976) 08.06.26 Zoom, FY26-27 100-225-610000 149.90 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6976) 08.06.26 American Planning Association, FY26- 27 100-225-610000 671.80
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6976) 08.06.26 APA California, Conference, 10/3/26 - 10/6/26
100-225-611000 700.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Bluebeam Subscription, 7/1/26 - 5/5/27
100-195-700090 1,072.50
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 FY25-26 Bluebeam Subscription, 5/3/26 - 6/30/26
100-195-700090 214.50
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6615) 08.06.26 Chevron 100-310-646100 257.50
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Cox, Cable, City Hall, 7/10/26 - 100-195-630000 364.91 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Zoom, Subscription, 7/8/26 - 7/15/26 100-195-700090 34.74 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Zoom, Subscription, 7/16/26 - 100-195-700090 130.22 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Cox, T-1 Comm Ctr, 7/17/26 - 100-195-630000 587.14 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Cox, WiFi Comm Ctr, 6/28/26 -
7/27/26
100-195-630000 657.52
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Cox, T-1 City Hall, 7/5/26 - 8/4/26 100-195-630000 848.06 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Best Buy, HDMI Cables Return 100-195-622000 (172.35) 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Cox, WiFi City Hall, 7/19/26 - 8/18/26 100-195-630000 182.62 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Cox, Traffic Signal, 7/7/26 - 8/6/26 100-195-630000 84.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Ephonamation.com, 7/23/26 -
8/19/26
100-355-630000 505.98
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 The Home Depot 100-355-645500 31.08 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (6285) 08.06.26 Best Buy, HDMI Cables 100-195-622000 387.80 Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026 Payment Date Vendor Name Payable Number Description (Item) Account Number 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Bushfire Kitchen 100-355-622000 22.17 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (5166) 08.06.26 Amazon 100-355-622000 7.52
Amount
08/20/2026 DAVID WINNICK 112994356 Refund, Facility Deposit, R #111145659
100-000-222000 100.00
08/20/2026 JACQUELINE ESQUIVEL 112994441 Refund, Facility Deposit, R #105461240
100-000-222000 100.00
8/27/2026 7:25:27 PM Page 4 of 8
08/20/2026 SOUTHERN CALIFORNIA EDISON 080326 - Acct #700234509668 Utilities, Electric, 6/12/26 - 7/31/26 100-356-631400 13,987.23 08/20/2026 MOULTON NIGUEL WATER DISTRICT 081326 Utilities - Water, 7/14/26 - 8/10/26 100-355-635000 3,780.42 08/20/2026 CIVIC SOLUTIONS, INC. 108964 Consultant Services, USE-0264-2026, Jul '26
100-000-223000 688.00
08/20/2026 DIAMOND ENVIRONMENTAL
SERVICES, LP
0007090061 Build-A-Fort Restroom, 7/20/26 -
8/13/26
100-310-695500 915.96
08/20/2026 GA TECHNICAL SERVICES, INC. 07/14/26 Retention Release, CIP #520 100-000-201001 14,274.11 08/20/2026 SOUTHERN CALIFORNIA EDISON 080326 - Acct #700234509668 Utilities, Electric, 6/12/26 - 7/31/26 100-355-631000 835.91 08/20/2026 AT&T 000025646766 Alarm, Com Ctr & City Hall Lines, 7/7/26 - 8/6/26
100-310-630000 140.11
08/20/2026 DIAMOND ENVIRONMENTAL
SERVICES, LP
0007029676 Build-A-Fort Restroom, 6/22/26 -
6/30/26
100-310-695500 318.66
08/20/2026 DIAMOND ENVIRONMENTAL
SERVICES, LP
0007029676 (2) Build-A-Fort Restroom, 7/1/26 -
7/19/26
100-310-695500 672.73
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8665) 08.06.26 Ralphs 100-310-622000 9.24
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8665) 08.06.26 Stater Bros 100-310-622000 5.19 08/20/2026 AT&T 000025646766 Alarm, Com Ctr & City Hall Lines, 7/7/26 - 8/6/26
100-195-630000 215.60
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 OC Fun Event, Airbrush Tattoo Artist, NNO 7/23/26
100-420-695000 460.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 Michaels Stores, National Night Out Supplies
100-420-695000 46.07
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 The Home Depot, Refrigerator 100-420-910000 823.65 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 Ralphs 100-420-622000 41.20
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 The Toll Roads 100-420-646100 3.50 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 Stage 21 Bikes, Bicycle Safety
Initiative, Helmets
100-420-695000 2,990.06
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 Amazon Prime 100-420-610000 16.15 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 In-N-Out 100-420-622000 171.05
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8151) 08.06.26 Ralphs 100-420-622000 29.67
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Prime Video, Movie Rental 100-310-695512 3.99 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Prime Video, Movie Rental 100-310-695512 3.99 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Amazon, Office Chairs 100-310-910000 732.69 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Amazon, Build-A-Fort 100-310-695500 10.76 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Ramona Rodeo Foundation,
Excursion, 8/28/26
100-310-695500 28.12
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Prime Video, Movie Rental 100-310-695512 3.99 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Hollyhock House, Excursion, 7/17/26 100-310-695500 18.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 OC Fair Parking, Excursion 7/24/26 100-310-695500 15.00 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Hollyhock House, Excursion, 7/17/26 100-310-695500 12.00 Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026 Payment Date Vendor Name Payable Number Description (Item) Account Number 08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 World Port LA, Catalina Excursion Parking, 7/18/26
100-310-695500 23.00
08/17/2026 US BANK CORPORATE PAYMENT
SYSTEMS
CalCard (8097) 08.06.26 Amazon, Craft Supplies 100-310-695500 20.45
Amount
08/27/2026 PSOMAS 237970 100-000-790600 412.50
08/27/2026 WEST COAST ARBORISTS, INC. 247880 100-355-720702 29,457.10 8/27/2026 7:25:27 PM Page 5 of 8
08/27/2026 ARDURRA GROUP, INC. 190109 100-355-700250 2,855.25 08/27/2026 IRV SEAVER MOTORCYCLES 20261582 100-420-646100 1,486.38 08/27/2026 IRV SEAVER MOTORCYCLES 20261625 100-420-646100 475.61 08/27/2026 ARC DOCUMENT SOLUTIONS, LLC 13182724 100-355-623000 202.09 08/27/2026 TAIT & ASSOCIATES, INC 170487 100-355-700250 5,390.00 08/27/2026 ACTION WELDING CORP 18559 100-355-720701 2,125.00 08/27/2026 SAN DIEGO GAS AND ELECTRIC 081426 (2) 100-356-631400 11,265.91 08/27/2026 SAN DIEGO GAS AND ELECTRIC 081426 (2) 100-356-631900 738.23 08/27/2026 WEST COAST ARBORISTS, INC. 1-12453 100-355-720702 1,400.00 08/27/2026 SAN DIEGO GAS AND ELECTRIC 081426 100-310-631000 13,847.90 08/27/2026 SAN DIEGO GAS AND ELECTRIC 081426 100-355-631000 13,835.24 08/27/2026 SAN DIEGO GAS AND ELECTRIC 081426 100-356-631400 2,354.13 08/27/2026 EL TORO WATER DISTRICT 073126 100-355-635000 31,208.12 08/27/2026 MOULTON NIGUEL WATER DISTRICT 081326 (2) 100-310-635000 850.82 08/27/2026 MOULTON NIGUEL WATER DISTRICT 081326 (2) 100-355-635000 20,069.70 08/20/2026 SAN DIEGO NATURAL HISTORY
MUSEUM
SI05864 100-310-695504 4,405.97
08/27/2026 AT&T 000025644804 100-356-630000 28.81
08/27/2026 DIAMOND ENVIRONMENTAL
SERVICES, LP
0007049826 100-310-695512 415.70
08/20/2026 ALL SERVICE ROOFING BLDR-0230-2026 100-000-227001 837.00 08/20/2026 SWANK MOTION PICTURES, INC. BO 2835051 100-310-695512 660.00 08/20/2026 FIRE SAFETY FIRST, LLC FSF-1142416 100-310-645500 750.00 08/20/2026 WILLIAMS SCOTSMAN INC 9026792912 100-310-641000 341.83 08/20/2026 BIG TOP RENTALS 96025 100-310-695508 5,446.02 08/20/2026 WESTERN ROOFING SYSTEMS BLDR-0220-2026 100-000-227001 961.00 08/20/2026 RJ ELECTRIC 64827 (2) 100-355-720701 2,245.00 08/20/2026 CHARLES ABBOTT ASSOCIATES, INC 70690 100-225-700000 37,158.84 08/20/2026 JAMEY CLARK, INC. 78133 100-310-721505 3,450.00 08/20/2026 MOTION PICTURE LICENSING
CORPORATION
504480660 100-000-140000 684.47
08/20/2026 MOTION PICTURE LICENSING
CORPORATION
504480660 100-310-610000 2,053.43
08/20/2026 RJ ELECTRIC 64827 100-355-720701 230.00
08/20/2026 AQUATICO 372-299 100-310-645500 895.00
08/20/2026 AQUATICO 372-300 100-310-645500 4,000.00
08/20/2026 BILL'S SOUND AND SECURITY 48631 100-310-645500 733.00 08/20/2026 NUVIS LANDSCAPE ARCHITECTURE 28912 100-000-223000 990.00 08/20/2026 NUVIS LANDSCAPE ARCHITECTURE 28915 100-000-223000 550.00 08/20/2026 NUVIS LANDSCAPE ARCHITECTURE 28916 100-000-223000 1,645.00 08/20/2026 ARC DOCUMENT SOLUTIONS, LLC 13174712 100-225-623000 91.48 08/20/2026 LSA ASSOCIATES, INC 205724 100-000-223000 3,060.00 08/20/2026 CAT TRACKING INC 220594RET 100-000-201001 11,855.00 Payment Date Vendor Name Payable Number Account Number
08/20/2026 JCTEES.COM CORPORATION 11310 100-310-622500 439.11 08/20/2026 I CAN ACADEMY OC 113122798
Description (Item)
Basketball Championship T-Shirts,
Aug '26
Refund, Facility Deposit, R
#105934313
Printing Services, Jul '26
Professional Services, USE-0239-
2025, Jul '26
Retention Release, CIP #113
Professional Services, LEG-0017-
2025, Jun '26
Professional Services, LEG-0020-
2026, Jun '26
Professional Services, LEG-0020-
2026, Jun '26
Fountains/Water Features
Maintenance, Aug '26
Wall Water Fountain Cleaning, Aug
Smoke Detector Repair, 7/10/26
Indoor Movie License, 7/1/27 -
9/29/27
Indoor Movie License, 9/30/26 -
6/30/27
Pole Light Repairs, Gazebo Path, Jun
'26
Pole Light Repairs, Gazebo Path, Jul
Professional Services, Jul '26
Janitorial Services, Jul '26
Storage Rental, 8/13/26 - 9/9/26
Furniture Rentals, 4th of July
BLDR-0220-2026, C&D Refund, REC017062-2026
BLDR-0230-2026, C&D Refund, REC017096-2026
Super Mario Galaxy, 8/21/26
Fire Sprinkler System Inspection &
Test, 7/24/26
Fossil Exhibit Improvement Project,
Jul '26
Traffic Signal, 7/6/26 - 8/5/26
Restroom Rental, 8/21/26
Water Usage, Public Works, Jul '26
Utilities - Water, 7/14/26 - 8/10/26
Utilities - Water, 7/14/26 - 8/10/26
Utilities - Electric, 6/10/26 - 7/10/26
Utilities - Electric, 6/10/26 - 7/10/26
Utilities - Electric, 6/10/26 - 7/10/26
Utilities - Electric, 7/1/26 - 7/31/26
Utilities - Electric, 7/1/26 - 7/31/26
Plant Health Consulting Svcs, 8/13/26
- 8/14/26
Printing Services, Aug '26
Reader Board Design, Jul '26
Parks Contract Repair, Aug '26
Engineering Services, Jul '26
Motorcycle Maintenance, Police Svcs,
Aug '26
Motorcycle Maintenance, Police Svcs,
Aug '26
PDV and Cabot Road, CIP #191,
7/1/26 - 7/23/26
Tree Trimming Services, 7/16/26 -
7/31/26
100-000-222000 200.00
Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026
Amount
8/27/2026 7:25:27 PM Page 6 of 8
Fund: 600 - Capital Improvement Projects Fund
08/27/2026 PSOMAS 237970 000-490100 (412.50)
08/27/2026 PSOMAS 237970
PDV and Cabot Road, CIP #191,
600-7/1/26 - 7/23/26
PDV and Cabot Road, CIP #191,
600-7/1/26 - 7/23/26
251-950191 412.50
Fund 600 - Capital Improvement Projects Fund Total: -
Grand Total: 437,649.11
Fund 221 - Senior Mobility Program Fund Total: 6,563.00 Fund: 306 - Waste & Recycling Fee Fund
08/27/2026 ECONOMICS, INC. 2024.23 Professional Services, Recycling Program, May '26
306-355-700000 13,929.86
08/27/2026 ECONOMICS, INC. 2024.25 Professional Services, Recycling Program, Jul '26
306-355-700000 12,936.87
Fund 306 - Waste & Recycling Fee Fund Total: 26,866.73
08/27/2026 CHARLES ABBOTT ASSOCIATES, INC 70699 - B Traffic Control for Striping, Jul '26 212-355-720400 4,539.40 08/27/2026 SCA OF CA, LLC CA0943906 Street Sweeping Services, May '26 212-355-720410 155.00 Fund 212 - Measure M2 Fund Total: 59,075.84
Fund: 221 - Senior Mobility Program Fund
08/20/2026 OCY MANAGEMENT, LLC 7406026 Senior Mobility Program, Jul '26 221-310-720000 6,563.00 08/27/2026 COUNTY OF ORANGE SH 74846 Fingerprint ID System Charges, Aug 100-420-720835 1,008.00 08/27/2026 LIVING INTERIORS T89542 Interior Plantscape Services, Sep '26 100-310-645500 159.00 Fund 100 - General Fund Total: 345,143.54
Fund: 212 - Measure M2 Fund
08/27/2026 CHARLES ABBOTT ASSOCIATES, INC 70699 Road Maintenance, Jul '26 212-355-720400 54,381.44 08/27/2026 ONTARIO REFRIGERATION SERVICE,
INC.
CM50399 Water Leak Repair, 8/4/26 100-355-645500 487.16 08/27/2026 SOUTHERN COMPUTER WAREHOUSE INV00875552 Veeam Data Platform Advanced, 7/1/26 - 6/30/27
100-195-700090 6,643.36
08/27/2026 ALL CITY MANAGEMENT, INC. PS-INV107410 Crossing Guard Services, 8/2/26 - 8/15/26
100-420-720822 614.40
08/27/2026 JAMEY CLARK, INC. 77811 Graffiti Removal, May '26 100-355-720500 288.00 08/27/2026 JAMEY CLARK, INC. 78164 Graffiti Removal, Aug '26 100-355-720500 950.00 08/27/2026 JAMEY CLARK, INC. 78174 Graffiti Removal, Aug '26 100-355-720500 760.00 08/27/2026 RJ ELECTRIC 64928 Light Repairs, Sports Field Parking Lot, Aug '26
100-355-720701 810.00
08/27/2026 CHARLES ABBOTT ASSOCIATES, INC 70699 - A Parks Signs Install, Jul '26 100-355-720701 150.84 08/27/2026 CHARLES ABBOTT ASSOCIATES, INC 70699 - C July 4th Event Traffic Support, Jul '26 100-355-720401 9,958.28 08/27/2026 CIVICPLUS, LLC 385382 System Training, 8/19/26 100-195-611000 720.00 08/27/2026 TOTAL SOURCE OFFICEWORKS 42253 Operating Supplies, Aug '26 100-195-622000 285.40 08/27/2026 HIGH LEVEL SECURITY SOLUTIONS,
INC.
6121 Private Security Patrol, 8/10/26 -
8/23/26
100-420-720850 7,952.00
08/27/2026 SHUTE, MIHALY WEINBERGER LLP 298075 Professional Services, Legal, Jul '26 100-155-700010 928.72 08/27/2026 RJM DESIGN GROUP, INC. 37989 Sports Complex Renovations Design, Jul '26
100-355-700250 1,546.00
08/27/2026 RJM DESIGN GROUP, INC. 38039 Reader Board Design, Jul '26 100-355-700250 866.16 Payment Date Vendor Name Payable Number Description (Item) Account Number 08/27/2026 ABTECH TECHNOLOGIES, INC. 2608009-IN Computer Hardware 100-195-940000 1,279.53 08/27/2026 J & A GLASS 27877 Exterior Window Replacement, Suite 310, Jul '26
100-355-645500 9,929.26
Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026
100-355-631000 Utilities - Electric 14,671.15
100-355-635000 Utilities - Water 55,058.24
100-355-645500 Facility Maintenance & Repairs 10,447.50 8/27/2026 7:25:27 PM Page 7 of 8
100-310-910000 Furniture & Equipment 732.69
100-355-610000 Memberships & Subscriptions 20.00
100-355-611000 Training, Conferences, & 90.00
100-355-622000 Operating Supplies 176.35
100-355-623000 Printing & Mailing 202.09
100-355-630000 Communications 505.98
100-310-695000 Community Assistance & Public 258.60
100-310-695500 Special Events - Program Services 5,796.02 100-310-695504 Exhibits & Educational Programs 4,405.97 100-310-695508 July Fourth Celebration 5,446.02
100-310-695512 Movies in the Park 1,542.67
100-310-721505 Contract Services - Janitorial & 3,450.00 100-310-630000 Communications 140.11
100-310-631000 Utilities - Electric 13,847.90
100-310-635000 Utilities - Water 850.82
100-310-641000 Equipment Rentals & Leases 341.83
100-310-645500 Facility Maintenance & Repairs 6,537.00
100-310-646100 Vehicles - Fuel & Maintenance 488.10
100-225-646100 Vehicles - Fuel & Maintenance 325.00
100-225-700000 Professional Services - Building & 37,158.84 100-310-610000 Memberships & Subscriptions 2,653.43
100-310-611000 Training, Conferences, & 45.00
100-310-622000 Operating Supplies 501.67
100-310-622500 Program & League Supplies 439.11
100-195-630000 Communications 2,939.85
100-195-700090 IT Contract Services & Support 8,163.12
100-195-940000 Computer Hardware 1,279.53
100-225-610000 Memberships & Subscriptions 856.54
100-225-611000 Training, Conferences, & 1,400.00
100-225-623000 Printing & Mailing 2,431.48
100-155-623000 Printing & Mailing 119.14
100-155-700010 Legal Services 928.72
100-195-610000 Memberships & Subscriptions 55.00
100-195-611000 Training, Conferences, & 720.00
100-195-617000 Recruitment 105.00
100-195-622000 Operating Supplies 2,986.61
100-000-223000 Plan Application Deposit 6,933.00
100-000-227001 Security Deposit - Waste 1,798.00
100-000-790600 Transfers Out to Capital 412.50
100-155-610000 Memberships & Subscriptions 20.00
100-155-611000 Training, Conferences, & 2,700.00
100-155-622000 Operating Supplies 1,136.30
600 - Capital Improvement Projects Fund -
Grand Total: 437,649.11
Account Summary
Account Number Account Name Payment Amount
100-000-140000 Prepaid Items 684.47
100-000-201001 Accounts Payable - Retention 26,129.11
100-000-222000 Refundable Deposits 400.00
Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026 Report Summary
Fund Summary
Fund Payment Amount
100 - General Fund 345,143.54
212 - Measure M2 Fund 59,075.84
221 - Senior Mobility Program Fund 6,563.00
306 - Waste & Recycling Fee Fund 26,866.73
Grand Total: 437,649.11
Project Account Summary
Project Account Key Payment Amount
**None** 437,649.11
Grand Total: 437,649.11
8/27/2026 7:25:27 PM Page 8 of 8
212-355-720400 Street Maintenance 58,920.84
212-355-720410 Street Sweeping 155.00
221-310-720000 Contract Services 6,563.00
306-355-700000 Professional Services 26,866.73
600-000-490100 Transfers In from General Fund (412.50)
600-251-950191 PDV Active Transportation 412.50
100-420-646100 Vehicles - Fuel & Maintenance 1,965.49
100-420-695000 Community Assistance & Public 3,496.13
100-420-720822 Crossing Guard Services 614.40
100-420-720835 Fingerprint Identification Services 1,008.00 100-420-720850 Private Security Patrol 7,952.00
100-420-910000 Furniture & Equipment 823.65
100-355-720702 Tree Maintenance 30,857.10
100-356-630000 MOE - Communications 28.81
100-356-631400 MOE - Electric (Streetlights & 27,607.27 100-356-631900 MOE - Electric (On-Bill Financing) 738.23 100-420-610000 Memberships & Subscriptions 16.15
100-420-622000 Operating Supplies 241.92
100-355-646100 Vehicles - Fuel & Maintenance 2,548.53
100-355-700250 On-Call Services 10,657.41
100-355-720401 Other Public Works Maintenance 10,486.48 100-355-720500 Graffiti Removal 1,998.00
100-355-720700 Landscape Maintenance 9,575.45
100-355-720701 Parks Maintenance & Repairs 6,198.06
Payables Detail Report Payment Dates: 08/14/2026 - 08/27/2026 Account Summary
Account Number Account Name Payment Amount
Item No. 4.4
City of Laguna Hills
City Council / Planning
Agency
Staff Report
Date: September 8, 2026
To: Mayor and Council Members
From: Joe Ames, Assistant City Manager
Issue: Authority to Advertise for Construction, FY 2026-2027 Community Development Block Grant Curb Ramp Improvement Project, CIP 170 Recommendation: That the City Council: 1. Approve the plans and specifications for the FY 2026-2027 Community Development Block Grant Curb Ramp Improvement Project, CIP 170; 2. Authorize the advertisement for bids for FY 2026-2027 Community Development Block Grant Curb Ramp Improvement Project, CIP 170; 3. Authorize the City Engineer to make minor edits to the plans and specifications as necessary prior to bidding; and 4. Find that environmental review is not required under the California Environmental Quality Act (CEQA) pursuant to the California Code of Regulations, Title 14, Chapter 3, Section 15301 as a Class 1 Categorical Exemption - “Existing Facilities." Background:
As part of City staff’s ongoing effort to identify and apply for grant funding for infrastructure improvements, on December 4, 2025, City staff submitted an application for Community Development Block Grant (CDBG) funding to the County of Orange during its latest call for Public Facilities and Improvements Funding Applications. City staff submitted a project for approximately 80 curb ramp replacements at selected intersections bounded by Avenida de la Carlota, Lake Forest Drive, Santa Vittoria Drive, and Ridge Route Drive.
In November 2025, the County of Orange, Community Resources Department, announced a call for fiscal year 2026/2027 Public Facilities and Improvements project applications under the County’s Urban County Program funded by the United States Department of Housing and Urban Development (HUD). The funding available under the Urban County Program primarily comes from CDBG funds.
Item No. 4.4
The Orange County Urban County Program is comprised of twelve (12) cities with populations under 50,000 (participating cities), two (2) cities, Placentia and Yorba Linda, with populations over 50,000 (metropolitan cities) and unincorporated areas of Orange County. The twelve (12) participating cities include Brea, Cypress, Dana Point, Laguna Beach, Laguna Hills, Laguna Woods, La Palma, Los Alamitos, San Juan Capistrano, Seal Beach, Stanton, and Villa Park. These cities are not eligible to receive Community Planning and Development (“CPD”) program funds directly from HUD and have opted to participate in the CPD programs through the Urban County Program. The cities of Placentia and Yorba Linda, with populations of over 50,000, are eligible to participate in the CPD program as an entitlement jurisdiction and have elected to join with the Urban County Program as a metropolitan city.
The fiscal year 2026/2027 Public Facilities and Improvements maximum funding amount with no match was $250,000, or with a 20% match was $450,000. Only one application may be submitted by each participating city. Non-profit organizations may also participate in the Urban County Program, but must be sponsored by a city and the city must submit the application.
Project applications must address “high priority” Public Facilities and Improvements. For this project call, high priority projects are, in order of preference, as follows:
1. Senior Centers
2. Homeless Facilities
3. Neighborhood Facilities
4. Water/Sewer Improvements
5. Street Improvements
6. Sidewalk Improvements
7. “Urgent Need”
Furthermore, the population to be served by the project must principally be low to moderate-income as defined by HUD. Low to moderate-income populations include census tracts that are classified by the United States Census Bureau as having a median household income (in 2022 dollars based on 2020 American Community Survey data) below the median for the area.
For this call for projects, City staff researched the United States Census Bureau’s latest data and found several low to moderate-income census tracts in Laguna Hills where 51% or more of the residential neighborhood consist of low to moderate-income persons. Two such census tract locations are bounded by Avenida de la Carlota, Lake Forest Drive, Santa Vittoria Drive, and Ridge Route Drive.
Item No. 4.4
Therefore, given the information available and funding rules, City staff submitted a project for approximately 80 curb ramp replacements at intersections bounded by Avenida de la Carlota, Lake Forest Drive, Santa Vittoria Drive, and Ridge Route Drive with a total value of $250,000. The application was successful.
However, the County only awarded $195,121 to the City due to a subsequent reduction in grant funding from HUD. Correspondingly, the City reduced the scope of work of the project to 63 ramp locations to match the reduced grant funding amount allocated to the project. In the capital improvement program budget for fiscal years 2025/26 - 2026/27, City staff budgeted $250,000 for construction of this project as part of CIP 170, and an additional $50,000 for design efforts using general funds.
After award of the CDBG grant, City staff engaged one of the City's on-call civil engineering consultants, Tait & Associates, to design the FY26/27 Community Development Block Grant Curb Ramp Replacement Project, CIP 170. City staff and Tait & Associates have been working diligently to prepare the plans because the County has a construction contract award deadline of November 15, 2026.
This project is now ready for advertisement for bids. Correspondingly, City staff recommend the City Council approve the plans and specifications and authorize the advertisement for bids for the FY26/27 Community Development Block Grant Curb Ramp Replacement Project, CIP 170.
Fiscal Impact:
The biennial capital improvement program budget for fiscal years 2025/26 - 2026/27 has $250,000 allocated in CDBG funds for construction and $50,000 allocated in general funds for design services. Currently, the engineer's cost estimate projects that sufficient funding exists for this project.
Attachments:
1. Plans and Specifications for CIP 170
LH Public Works 6909-0006-0000-2023
Master Template Public Works Contract
1774061.2
CITY OF LAGUNA HILLS
CALIFORNIA
PUBLIC WORKS PLANS
AND SPECIFICATIONS FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP
IMPROVEMENT PROJECT
CIP No. 170
PREPARED FOR
CITY OF LAGUNA HILLS
24035 EL TORO ROAD
LAGUNA HILLS, CA 92653
SEPTEMBER 2025
LH 6909-01/2023
1774061.2
CITY OF LAGUNA HILLS
SPECIFICATIONS FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
Approved By:
Joseph J. Ames, P.E., T.E., City Engineer Date
R.C.E. No. 66999
Expiration Date 9/30/2026
1774061.2 i LH 6909-01/2023
CITY OF LAGUNA HILLS
TABLE OF CONTENTS
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
NOTICE INVITING SEALED BIDS ........................................................................................ NB-1 INSTRUCTIONS TO BIDDERS ............................................................................................. IB-1
PROPOSAL DOCUMENTS
Proposal.................................................................................................................................. P-1 Bidders Information ................................................................................................................. P-3 List of Subcontractors ............................................................................................................. P-4 References ............................................................................................................................. P-5 Contractor’s Licensing Statement............................................................................................ P-6 Bid Bond ................................................................................................................................. P-7 Non-Collusion Affidavit ............................................................................................................ P-9 Proposal Bid Sheets ............................................................................................................. P-10 Bidder’s Certification of Acknowledgement of Compliance With Insurance ........................... P-14
CONTRACT DOCUMENTS
Contract Agreement .............................................................................................................. CA-1 Faithful Performance Bond.................................................................................................... CA-4 Material and Labor Bond ....................................................................................................... CA-6 Compensation Insurance Certificate ..................................................................................... CA-8
GENERAL SPECIFICATIONS
Scope of Work ..................................................................................................................... GS-1 Location of Work .................................................................................................................. GS-1 Time of Completion .............................................................................................................. GS-1 Traffic Requirements ............................................................................................................ GS-1 Utility Requirements ............................................................................................................. GS-1 Flow and Acceptance of Water ............................................................................................ GS-3 Removal of Water ................................................................................................................ GS-3 Standard Specifications ....................................................................................................... GS-3 Resolution of Construction Claims ....................................................................................... GS-6
SPECIAL PROVISIONS
PART 1 - GENERAL PROVISIONS ...................................................................................... SP-1 PART 2 - CONSTRUCTION MATERIALS ........................................................................... SP-30 PART 3 - CONSTRUCTION METHODS ............................................................................ SP-32 PART 4 - EXISTING IMPROVEMENTS ............................................................................. SP-43 PART 7 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS ................................... SP-46
APPENDICES
Water Pollution Control Plan Template ....................................................................... Appendix A Applicable Standard Plans .......................................................................................... Appendix B Project Plans .............................................................................................................. Appendix C HUD 4010 Federal Labor Standards Provisions ......................................................... Appendix D
1774061.2 NB-1 LH 6909-01/2023
CITY OF LAGUNA HILLS
NOTICE INVITING BIDS FOR CONSTRUCTION OF
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
NOTICE IS HEREBY GIVEN that sealed bids for the FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170 (“Project”) in the City of Laguna Hills will be received at the Office of the City Engineer of the 24035 El Toro Road, Laguna Hills, until 2:00 p.m. on Wednesday, October 14, 2026, at which time they will be publicly opened and read aloud.
DESCRIPTION OF THE WORK: In general, the work is comprised of public works construction including sawcutting, removing, and reconstructing curb ramps with yellow tile truncated domes, replacing blue truncated domes with yellow tile truncated domes, and adjusting traffic signal pull boxes to grade, and other miscellaneous improvements as shown on the plans and as required to complete the work.
Most curb ramp improvements on this Project will be paid using Community Development Block Grant funding. Therefore, the City of Laguna Hills is requesting (but not requiring) bids from qualified bidders – including Section 3 license contractors and suppliers.
AWARD OF CONTRACT: The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids, as it may best serve the interest of the City. Within three (3) business days of bid opening, contractor must submit a revised bid bond with numerical dollar values, both in words and with digits of bid amount. Within five (5) working days after the date of the Notice of Apparent Low Bidder, the successful bidder will be required to submit required Contract Agreement and Insurance.
Within ten (10) working days after the date of the Notice of Award, the successful bidder will be required to submit Bonds (Faithful Performance and Material and Labor), Construction Schedule, and Water Pollution Control Plan.
CONTRACTOR’S LICENSE CLASSIFICATION: The Contractor shall possess a valid Class A Contractor’s License, or a combination of Class C Contractor's Licenses as necessary to perform the work, at the time of submitting bids, in accordance with provisions of Chapter 9, Division III of the California Business and Professions Code.
WAGE RATE REQUIREMENTS: The wage rates applicable to this Project are the State of California Department of Industrial Relations prevailing rates of per diem wages and the U.S. Davis-Bacon Wage Rates for Federally-Funded Projects. Not less than higher of the State or Federal prevailing wage rates shall be paid for work on this Project.
In accordance with the provisions of Sections 1773.2 of the California Labor Code, copies of the general prevailing rate of per diem wages as determined by the State Director of Industrial Relations are available at City Hall, which shall be made available to any interested party upon request, or on the Internet at the State Department of Industrial Relations website (www.dir.ca.gov) under Statistics and Research. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor to pay not less than said specified rates to all workers employed by them in the execution of the contract. A copy of said rates shall be posted at each job site during the course of construction. The Contractor and all subcontractors shall comply with all provisions of the California Labor Code relating to prevailing wage rates, including Sections 1770–1781.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Department of Industrial Relations shall monitor and enforce compliance with applicable prevailing wage requirements for the contract. The reporting requirements may be found at https://www.dir.ca.gov/Public-Works/Contractors.html. The Contractor is responsible for complying with all requirements of the Department of Industrial Relations, including filing electronic payroll reports.
1774061.2 NB-2 LH 6909-01/2023
A contractor or subcontractor will not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
Due to Community Development Block Grant fuding, this is a Federally-assisted construction contract. Prevailing wage requirements of the Davis-Bacon Act and related requirements, will be enforced. The Federal wage rates are attached as Appendix D and can be found at the Department of Labor’s website: https://www.dol.gov. The final contract package signed by the City and the Contractor will contain the most updated the federal wage rates.
RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payments by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. If the Contractor chooses not to exercise its rights under Public Contract Code Section 22300, the full five percent (5%) retention will be deducted from all payments.
The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion, if no stop notices have been filed. The City may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the City.
OBTAINING OR INSPECTING CONTRACT DOCUMENTS: Contract Documents may be inspected without charge at the Public Works Department, City Hall, 24035 El Toro Road, Laguna Hills, California 92653. Contract Documents are available in portable document form (PDF) on the City’s website https://lagunahillsca.gov/bids.aspx. It is the contractor’s responsibility to ensure they are on the City’s Plan Holder’s List and they obtain any addendums or clarifications that are issued by the City on the City’s website prior to submitting a bid. For any questions regarding acquisition of Contract Documents, contact Julie Comella at [email protected]. Questions regarding the Contract Documents must be submitted in writing at least five (5) working days prior to the scheduled bid opening.
Dated this 11th day of September 2026. City of Laguna Hills, California BY _____________________________
JOSHUA STEVENSON, CMC, CITY CLERK
Published: Saddleback Valley News 24035 El Toro Road
Laguna Hills, CA 92653
1774061.2 IB-1 LH 6909-01/2023
CITY OF LAGUNA HILLS
INSTRUCTIONS TO BIDDERS
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
1. PROPOSAL FORMS
Bids shall be submitted in writing on the Proposal forms provided by the City of Laguna Hills (hereinafter “CITY” or “City”). All blank spaces in the bid forms must be correctly filled in and all information requested therein must be clearly and legibly set forth in the manner and form indicated. All spaces for bid prices and lump sum price for which the bid is made, must be filled in, in both words and figures. All prices and notations must be in ink or typewritten. No erasures will be permitted. Mistakes may be crossed out and corrections typed or written in ink adjacent thereto and must be initialed by the person or persons signing the bid. Bidder acknowledges and agrees that by failing to complete the bid forms in their entirety, as set forth above, the CITY may find the bidder’s entire bid non-responsive and may cause the rejection of the bidder’s proposal at the discretion of the CITY.
2. PROPOSAL GUARANTEE (BID BOND)
In accordance with Public Contract Code Section 20170, proposals must be accompanied by a proposal guarantee consisting of either cash, a cashier’s check, a certified check or bid bond payable to the CITY in the minimum amount of ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. IF A BIDDER TO
WHOM A CONTRACT IS AWARDED FAILS OR REFUSES TO EXECUTE THE CONTRACT
DOCUMENTS OR FURNISH THE REQUIRED INSURANCE POLICIES AND BONDS AS
SET FORTH IN THOSE DOCUMENTS, THE PROPOSAL GUARANTEE SHALL BE FORFEITED TO THE CITY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all Contract Documents.
3. NON-COLLUSION AFFIDAVIT
Bidder shall declare that the only persons or parties interested in the proposal as principals are those named therein; that no officer, agent, or employee of the CITY is personally interested, directly or indirectly, in the proposal; that the proposal is made without connection to any other individual, firm, or corporation making a bid for the same work; and that the proposal is in all respects fair and without collusion or fraud. The Non-Collusion Affidavit shall be executed and submitted with the proposal.
4. PROPOSAL BID SHEET
Bidders shall give unit prices for each and all of the items set forth. No aggregate bids will be considered. The bidder shall set forth for each item of work, in clearly legible figures, a unit item price and a total for the item in the respective spaces provided for this purpose. The quantities listed in the Bid sheets are supplied to give an indication of the general scope of work, but the accuracy of figures is not guaranteed and the bidder shall make his own estimates from the drawings. In case of a variation between the unit price and the totals shown by the bidder, the unit price will be considered to be the bid.
1774061.2 IB-2 LH 6909-01/2023
5. DELIVERY OF PROPOSAL
Proposals may be mailed or delivered by messenger. However, it is the bidder's responsibility alone to ensure delivery of the proposal to the hands of the CITY's designated official prior to the bid opening time deadline set forth in the "Notice Inviting Sealed Bids." Late proposals will not be considered and will be returned to the bidder unopened. Proposals shall be enclosed in a sealed envelope plainly marked on the outside, "FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170 - DO NOT OPEN WITH REGULAR MAIL."
6. WITHDRAWAL OF PROPOSALS
A proposal may be withdrawn by a written request signed by the bidder. Such requests must be delivered to the CITY's designated official prior to the bid-opening time deadline set forth in the "Notice Inviting Sealed Bids". The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, provided there is time remaining to do so. Proposals may not be withdrawn after the bid opening without forfeiture of the proposal guarantee, except as authorized by state law. .
7. NONRESPONSIVE PROPOSALS
Unauthorized conditions, limitations, or provisions attached to a proposal will render it nonresponsive and may cause its rejection. The completed proposal forms shall be without inter-lineation, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered.
8. TAXES
No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes that may be applicable. Bidder acknowledges and agrees that CITY shall not be responsible for the payment of any increase in Sales Tax, Use Tax, or any other tax that takes effect after award.
9. DISQUALIFICATION OF BIDDERS
In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder.
No contract will be executed unless the bidder is licensed in accordance with the provisions of the Business and Professions Code.
10. INTERPRETATION OF PLANS AND DOCUMENTS
If any person contemplates submission of a bid for the proposed contract and is in doubt as to the true meaning of any part of the plans, specifications or other proposed contract documents, or finds discrepancies in, or omissions from, the drawings or specifications, he or she may submit to the City Engineer a written request for an interpretation or correction thereof five (5) working days prior to the scheduled bid opening. The person submitting the request
1774061.2 IB-3 LH 6909-01/2023
will be responsible for its prompt delivery. Any interpretation or correction of the proposed documents shall be made only by addendum duly issued and copy of such addendum will be mailed or delivered to each person receiving a set of such documents. The City Engineer will not be responsible for any other explanation or interpretations of the proposed documents.
11. ADDENDA OR BULLETINS
The effect of all addenda to the Contract Documents shall be considered in the bid, and said addenda shall be made a part of the Contract Documents and shall be returned with them.
Before submitting a bid, each bidder shall confirm as to whether or not any addenda have been issued, and failure to cover in this bid any such addenda issued, may render bid nonresponsive and may result in its rejection by the CITY.
12. LEGAL RESPONSIBILITIES
All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same are expressly referred to herein or not.
Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and Contract Documents, and to full compliance therewith.
13. AWARD OF CONTRACT
Following a review of the bids, the CITY shall determine whether to award the contract or to reject all bids. The award of contract, if made, will be to the lowest responsive-responsible bidder as determined solely by the CITY. At the time of contract award, the successful bidder shall hold a Class A Contractor's License, or a combination of Class C Contractor’s License(s), as required to perform the work, issued by the State of California. Additionally, the CITY reserves the right to reject any or all proposals, to accept any bid or portion thereof, to waive any irregularity, and to take the bids under advisement for the period of time stated in the "Notice Inviting Sealed Bids", all as may be required to provide for the best interests of the CITY. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the bidder to whom the award is contemplated.
Within three (3) days of bid opening contractor must submit a revised bid bond with numerical dollar values, both in words and with digits of bid amount. Within five (5) working days after the date of the Notice of Apparent Low Bidder, the successful bidder will be required to submit required Contract Agreement and Insurance. Within ten (10) working days after the date of the Notice of Award, the successful bidder will be required to submit Bonds (Faithful Performance and Material and Labor). Submission of these documents shall be at the Low Bidder’s sole cost and expense and shall not be made reimbursable by City. Award of Contract, if made, shall be solely the determination of the City Council.
No bidder may withdraw its proposal for a period of forty-five (45) days after the time set for opening thereof. However, the CITY will return all proposal guarantees within ten (10) days after the award of the contract or rejection of the bids, as the case may be, to the respective bidders whose proposals they accompany.
/
1774061.2 IB-4 LH 6909-01/2023
14. PREVAILING WAGE RATES
The wage rates applicable to this Project are the State of California Department of Industrial Relations prevailing rates of per diem wages and the U.S. Davis-Bacon Wage Rates for Federally-Funded Projects. Not less than higher of the State or Federal prevailing wage rates shall be paid for work on this Project.
In accordance with the provisions of Sections 1773.2 of the California Labor Code, copies of the general prevailing rate of per diem wages as determined by the State Director of Industrial Relations are available at City Hall, which shall be made available to any interested party upon request, or on the Internet at the State Department of Industrial Relations website (www.dir.ca.gov) under Statistics and Research.
The Federal Wage Rates are also available at City Hall or on the Internet (https://ppmoe.dot.ca.gov/des/oe/federal-wages/ca35.pdf) and are hereby physically attached, in conformance with the Federal 10-day rule, as a part of the Contract Documents (Appendix D). The Federal wage rate determination applies to Federal-aid contracts and all work performed exceeding $2,000 by subcontracts and subsequent lower-tier subcontracts and are required to be physically included in each executed contract. The City’s decision to award a contract is conditioned upon the Bidder’s acceptance of the Federal wage rate determination.
It shall be mandatory upon the Contractor to whom the Contract is awarded and upon any subcontractor to pay not less than said specified rates to all workers employed by them in the execution of the Contract. A copy of said rates shall be posted at each job site during the course of construction. The Contractor and all subcontractors shall comply with all provisions of the California Labor Code relating to prevailing wage rates, including Sections 1770–1781.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Department of Industrial Relations shall monitor and enforce compliance with applicable prevailing wage requirements for this Agreement. The reporting requirements may be found at https://www.dir.ca.gov/Public-Works/Contractors.html. The Contractor is responsible for complying with all requirements of the Department of Industrial Relations, including filing electronic payroll reports.
A contractor or subcontractor will not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Contractor and its subcontractors shall maintain active registration with the Department of Industrial Relations for the duration of the Project.
A contractor or subcontractor will not be qualified to bid on, be listed in a bid proposal, subject to Section 6109 of the public Contract Code, or engage in the performance of any contract for public work on a public works project if the contractor or subcontractor is ineligible to perform work pursuant to Section 1777.1 or 1777.7 of the Labor Code.
1774061.2 IB-5 LH 6909-01/2023
The CITY will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate or the Federal Minimum Wage Rate (whichever is greater) as set forth in the contract. The possibility of wage increases is one of the elements to be considered by the bidder in determining his bid, and will not under any circumstances be considered as the basis of a claim against the CITY on the Contract.
The Contractor and subcontractors shall comply with Section 1777.6 of the Labor Code which stipulates that it shall be unlawful to refuse to accept otherwise qualified employees as registered apprentices on any public works on any basis listed in Government Code Section 12940(a), as those bases are defined in Government Code Sections 12926 and 12926.1, except as provided in Labor Code Section 3077 and Government Code Section 12940.
15. WORKERS’ COMPENSATION CERTIFICATE
Section 3700 of the Labor Code requires that every employer shall secure the payment compensation by either being insured against liability to pay compensation with one or more insurers or by securing a certificate of consent to self-insure from the State Director of Industrial Relations.
In accordance with this section and with Section 1861 of the Labor Code, the Contractor shall sign a Compensation Insurance Certificate which is included with the Contract Agreement, and submit same to CITY along with the other required Contract Documents, prior to performing any work. Reimbursement for this requirement shall be considered as included in the various items of work.
16. CLAYTON ACT AND CARTWRIGHT ACT
In accordance with Section 7103.5 of the Public Contract Code, in entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to CITY all rights, and interest in and all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.
Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties.
17. SUBLETTING AND SUBCONTRACTING.
Pursuant to the Subletting and Subcontracting Fair Practices Act (commencing with Section 4100 of the Public Contract Code), bidders are required to list in their proposal the name business address, California contractor license number, and public works contractor registration number issued pursuant to Section 1725.5 of the Labor Code of each subcontractor who will perform work or labor or render services in or about the construction of the work or improvement or a subcontractor who specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Plans and Specifications in excess of 1/2 of 1% of this prime Contractor's total bid or $10,000, whichever is greater. If a subcontractor’s California contractor license number or public works contractor registration number are submitted incorrectly in the bid, it will not be grounds for filing a bid
1774061.2 IB-6 LH 6909-01/2023
protest or grounds for considering the bid nonresponsive if the corrected subcontractor’s California contractor license number is submitted to CITY within 24 hours after the bid opening If the bidder fails to list a subcontractor for a portion of work or if the bidder lists more than one subcontractor of the same portion of work in excess of 1/2 of 1% of the total bid or $10,000, whichever is greater, the bidder agrees that it is fully qualified to perform that portion of work itself, and that the bidder shall perform that portion of work itself. If after award of the contract, the bidder actually subcontracts that portion of work, except as provided in Public Contract Code Section 4107 or 4109, the bidder shall be subject to the penalties listed in Section 4111 of the Public Contract Code. It is the CITY's intent for the Subletting and Subcontracting Fair Practices Act to apply to all phases of the work.
18. SUBSTITUTION OF SECURITIES
In conformance with Public Contract Code Section 22300, which is incorporated herein by this reference, the Contractor may substitute securities for any monies withheld by the CITY to ensure performance under the Contract or, in the alternative, may request payment of retention earned directly to an escrow agent.
At the request and expense of the Contractor, the Contractor has the option to deposit securities, which have been approved by the CITY, with a State or Federally chartered bank as the escrow agent or require the City to deposit 5% of each progress payment with the escrow agent. Said securities will be used as a substitute for retention earnings required to be withheld by the CITY, pursuant to the construction contract. Said securities shall have no obligation to any other construction contract for substitution of securities in lieu of retention.
When the Contractor deposits the CITY approved securities with the escrow agent, the escrow agent shall notify the CITY within 10 calendar days of the deposit. Said securities shall be evaluated quarterly by the escrow agent to verify the current market value. If the current market value of said securities falls below the required amount, the escrow agent shall notify the Contractor and require additional securities and/or cash to be submitted for CITY approval, and be held in the escrow account to meet the Contractor's obligations. The escrow agent shall hold said securities until such time as the escrow agent receives written notification from the CITY that the Contractor has satisfactorily completed his Contract obligations.
The type of securities deposited and the method of release shall be approved by the City Attorney's office.
If the Contractor chooses not to exercise its rights under Public Contract Code Section 22300, the full five percent (5%) retention will be deducted from all payments. The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion, if no stop notices have been filed. The CITY may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the CITY.
19. BID DOCUMENT/PROPOSAL EDITS
No Proposer shall modify, edit, interlineate or change any portion of the Bid Proposal pages without the Agency’s written issuance of a formal Addenda. Any Proposer that modifies, edits, interlineates or changes the Bid Proposal sheets with unauthorized changes shall be deemed to be a non-responsive Bidder.
1774061.2 IB-7 LH 6909-01/2023
20. BUY AMERICA REQUIREMENTS
Attention is directed to the “Buy America” requirements of the Surface Transportation Assistance Act of 1982 (Section 165) and the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) Sections 1041(a) and 1048(a), and the regulations adopted pursuant thereto. In accordance with said law and regulations, all manufacturing processes for steel and iron materials furnished for incorporation into the work on this project shall occur in the United States; with the exception that pig iron and processed, pelletized and reduced iron ore manufactured outside of the United States may be used in the domestic manufacturing process for such steel and iron materials. The application of coatings, such as epoxy coating, galvanizing, painting, and any other coating that protects or enhances the value of such steel or iron materials shall be considered a manufacturing process subject to the “Buy America” requirements.
A Certificate of Compliance, conforming to the provisions in Section 6-1.07, “Certificates of Compliance,” of the Standard Specifications, shall be furnished for steel and iron materials.
The certificates, in addition to certifying that the materials comply with the specifications, shall also specifically certify that all manufacturing processes for the materials occurred in the United States, except for the exceptions allowed herein.
The requirements imposed by said law and regulations to do not prevent a minimal use of foreign steel and iron materials if the total combined cost of such materials used does not exceed one-tenth of one percent (0.1%) of the total contract cost or $2,500, whichever is greater. The Contractor shall furnish the City with acceptable documentation of the quantity and value of any foreign steel and iron prior to incorporating such materials into the work.
1774061.2 P-1 LH 6909-01/2023
BIDDER'S NAME:
CITY OF LAGUNA HILLS
PROPOSAL
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
TO CITY OF LAGUNA HILLS, as CITY:
In accordance with CITY's "Notice Inviting Sealed Bids", the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein.
BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Standard Specifications, Notice Inviting Sealed Bids, Instructions to Bidders, Proposal Documents, General Specifications, Special Provisions and Contract Documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with CITY at the unit and/or lump sum prices set forth in the following Proposal Bid Sheet. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to CITY of the Bid Security accompanying this proposal.
BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Proposal Bid Sheet are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts.
BIDDER agrees and acknowledges that it is aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and that the BIDDER will comply with such provisions of that code before the commencement of any work under this Contract, if awarded.
BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any CITY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.
BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the CITY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work; and that this proposal is in all respects fair and without collusion or fraud.
BIDDER certifies that affirmative action has been taken to seek out and consider disadvantaged business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been carefully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder.
1774061.2 P-2 LH 6909-01/2023
Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.
BIDDER'S NAME: DATE: , 20
BIDDER'S ADDRESS: BY:
(Print Name)
(Signature)
PHONE: ( ) TITLE:
Subscribed and sworn to before me BY: __________________________ this day of , 20 (Print Name)
(Signature of Notary Public) (Signature)
(Attach Jurat) TITLE: _______________________
(SEAL)
1774061.2 P-3 LH 6909-01/2023
BIDDER'S INFORMATION
BIDDER certifies that the following information is true and correct:
Bidder's Name:
Business Address:
Email: Telephone:( )
State Contractor's License No. and Class:
Original Date Issued: Expiration Date:
The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest in this proposal:
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows:
All current and prior DBA's, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:
Subscribed and sworn to before me BY: __________________________ this day of , 20 (Print Name)
(Signature of Notary Public) (Signature)
TITLE: _______________________
(SEAL)
1774061.2 P-4 LH 6909-01/2023
BIDDER'S NAME:
LIST OF SUBCONTRACTORS (4100 PUBLIC CONTRACT CODE)
BIDDER proposes to subcontract certain portions of the work, and to procure materials and equipment from suppliers and vendors in excess of ½ of 1% of the total bid amount or ten thousand dollars ($10,000), whichever is greater as follows (add additional pages as necessary) (Bidder must include all requested information):
Subcontractor Name:
Address:
License No. and Class:
DIR Registration No.:
Phone No.: Email:
Percent of Total Contract:
Specific Scope of Work:
Subcontractor Name:
Address:
License No. and Class:
DIR Registration No.:
Phone No.: Email:
Percent of Total Contract:
Specific Scope of Work:
Subcontractor Name:
Address:
License No. and Class:
DIR Registration No.:
Phone No.: Email:
Percent of Total Contract:
Specific Scope of Work:
Subcontractor Name:
Address:
License No. and Class:
DIR Registration No.:
Phone No.: Email:
Percent of Total Contract:
Specific Scope of Work:
1774061.2 P-5 LH 6909-01/2023
BIDDER'S NAME:
REFERENCES
The BIDDER shall provide the names, addresses, phone numbers, and e-mail addresses of three (3) references for which BIDDER has performed similar work within the past three years, with at least two (2) references being public agencies. Failure of the BIDDER to list the required references in the bid proposal, or the subsequent inability of the CITY to verify any provided references, shall result in the BIDDER being deemed non-responsive.
Agency Name:
Address:
Phone No.: Contact:
Description of Work:
Agency Name:
Address:
Phone No.: Contact:
Description of Work:
Agency Name:
Address:
Phone No.: Contact:
Description of Work:
DESIGNATION OF SURETIES
The following are the names, addresses, and phone numbers for all brokers and sureties from whom BIDDER intends to procure insurance and bonds:
Name:
Address:
Phone No.: Contact:
Name:
Address:
Phone No.: Contact:
Name:
Address:
Phone No.: Contact:
Name:
Address:
Phone No.: Contact:
1774061.2 P-6 LH 6909-01/2023
CONTRACTOR'S LICENSING STATEMENT
BIDDER certifies that the following is true and correct. The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.
Contractor's License Number:
DIR Registration No.:
Name of Individual Contractor (Print or type):
Signature of Owner(s):
Business Address:
or
Name of Company:
Business Address:
Officers:
Name: Title:
Name: Title:
Name: Title:
or
Name of Corporation:
Business Address:
Corporation organized under the laws of the State of:
Name of President of Corp./ Company Name of Secretary of Corp./ Company Subscribed and sworn to before me BY: __________________________ this day of , 20 (Print Name)
(Signature of Notary Public) (Signature)
TITLE: _______________________
(SEAL)
1774061.2 P-7 LH 6909-01/2023
BID BOND (Page 1 of 2) Bond Amount $
Bond Number
BIDDER’S BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, (the “Principal”) has submitted a
bid (the “Bid”) to the City of Laguna Hills, California (the “City”) for construction of the (the “Work”), as specifically set
forth in documents entitled ,
Dated: , 20 (the “Specifications”).
AND WHEREAS, the Principal is required to provide bidder’s security in an amount equal to at least ten percent (10%) of the amount of the Bid and has chosen to satisfy this obligation by providing this bond.
NOW, THEREFORE, we, the Principal, and (the
“Surety”), an admitted surety insurer in the State of California, are held firmly bound unto the City of Laguna Hills in the sum of and /100
DOLLARS ($ ), lawful money of
the United States of America, for the payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents, this amount being ten percent (10%) of the total amount of the Bid.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
1. If (a) the City accepts the Bid and awards the Principal a contract for the Work, and (b) within the time and manner required under the Specifications or by law, after the prescribed forms are presented to the Principal for signature, the Principal executes a written contract for construction of the Work in accordance with the Bid and delivers the required faithful performance and payment bonds and insurance policies, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
2. The Surety, for value received, hereby stipulates and agrees that the obligation of said Surety and its bond shall be in no way impaired or affected by any extension of the time within (NAME OF BIDDER)
(NAME OF PROJECT AND/OR DESCRIPTION OF WORK)
(TITLE OF BID PACKAGE)
(NAME OF SURETY)
1774061.2 P-8 LH 6909-01/2023
BID BOND (Page 2 of 2) Bond Amount $
Bond Number
which the City may accept such Bid; and said Surety does hereby waive notice of any such extension.
3. In the event suit is brought upon this bond by the City and judgment is recovered, as part of the obligation secured hereby and in addition to the face amount specified in this bond, the Surety shall pay all costs incurred by the City in such suit, including reasonable attorneys’ fees to be fixed by the court.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named on the day of , 20 .
PRINCIPAL: SURETY:
(Principal Name) (Seal) (Surety Name) (Seal)
By: By:
(Signature) (Signature)
(Print Name and Title) (Print Name and Title)
By: By:
(Signature) (Signature)
(Print Name and Title) (Print Name and Title)
Principal Address and Telephone: Surety Address and Telephone:
Affix Corporate Seals
Attach Notary Acknowledgments for All Signatures
Attach Power-of-Attorney if Executed by Attorney-in-Fact
1774061.2 P-9 LH 6909-01/2023
BIDDER'S NAME:
NON-COLLUSION AFFIDAVIT TO BE EXECUTED
BY BIDDER AND SUBMITTED WITH BID
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF LAGUNA HILLS )
In conformance with Public Contract Code Section 7106, the party making the foregoing bid declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that such bid is genuine and not collusive or sham; that said bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state].”
Signed: ______________________
Title
Subscribed and sworn to before me
this day of , 20 .
___________________________________
Signature of Notary Public
(SEAL)
1774061.2 P-10 LH 6909-01/2023
BIDDER'S NAME:
CITY OF LAGUNA HILLS
PROPOSAL BID SHEETS
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
BIDDER SHALL COMPLETE ALL BID PAGES INCLUDING BASE BID AND ADDITIVE BID 1 BASE BID ITEMS 1-4: All Areas
Item Description
Est.
Quantity Units
Unit
Price
Total
Cost
1 Mobilization (5% max of Subtotal) 1 LS
2 Traffic Control & Noticing 1 LS
3 Water Pollution Control Plan and
BMP Implementation
1 LS
4 Construction Surveying &
Monument Restoration
1 LS
SUBTOTAL IN FIGURES:
(BASE BID ITEMS 1-4) $
BASE BID ITEMS 5-9:
Item Description
Est.
Quantity Units
Unit
Price
Total
Cost
5 Remove & Replace Curb Ramp
per OCPW Std. Plan 1115, Case
1, with yellow tile truncated
domes.
6 EA
6 Remove & Replace Curb Ramp
per OCPW Std. Plan 1115, Case
2, with yellow tile truncated
domes.
2 EA
7 Remove & Replace Curb Ramp
per OCPW Std. Plan 1115, Case
4, with yellow tile truncated
domes.
5 EA
8 Remove & Replace Curb Ramp
per OCPW Std. Plan 1115, Case
7, with yellow tile truncated
domes.
1 EA
9 Remove existing blue truncated
domes (sawcut with no overcuts),
and install new yellow tile
truncated domes, per OCPW Std.
Plan 1115.
49 EA
SUBTOTAL IN FIGURES:
(BASE BID ITEMS 5-9) $
1774061.2 P-11 LH 6909-01/2023
BIDDER'S NAME:
TOTAL BASE BID IN FIGURES:
$ ____________________________
TOTAL BASE BID IN WORDS:
DOLLARS
AND CENTS.
NOTE: THE ESTIMATED QUANTITIES SHOWN HEREIN ARE APPROXIMATE AND ARE TO BE USED ONLY AS COMPARISON OF BIDS. PAYMENT FOR QUANTITIES WILL BE MADE FOR ACTUAL MATERIALS USED ON THE JOB. THE CITY RESERVES THE RIGHT TO
INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ALL OR ANY ITEM FROM THE CONTRACT. IF THERE IS A CONFLICT BETWEEN THE UNIT PRICE PROVIDED AND TOTAL COST, THE UNIT PRICE SHALL PREVAIL. IF THERE IS A CONFLICT BETWEEN THE “TOTAL BID FIGURES” AND THE “TOTAL BID IN WORDS”, THE “TOTAL BID IN WORDS” SHALL PREVAIL. AWARD SHALL BE ON THE BASIS OF BASE BID ONLY.
1774061.2 P-12 LH 6909-01/2023
BIDDER'S NAME:
CITY OF LAGUNA HILLS
PROPOSAL BID SHEETS
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
BIDDER SHALL COMPLETE ALL BID PAGES INCLUDING BASE BID AND ADDITIVE BID 1 ADDITIVE BID ITEMS A1-A2:
Item Description
Est.
Quantity Units
Unit
Price
Total
Cost
A1 Remove & Replace Curb Ramp
per OCPW Std. Plan 1115, Case
4, with yellow tile truncated
domes.
13 EA
A2 Remove existing blue truncated
domes (sawcut with no overcuts),
and install new yellow tile
truncated domes, per OCPW Std.
Plan 1115.
1 EA
SUBTOTAL IN FIGURES:
(ADDITIVE BID ITEMS 5-8) $
TOTAL BASE BID PLUS ALL ADDITIVE BIDS IN FIGURES:
$ ____________________________
TOTAL BASE BID PLUS ALL ADDITIVE BIDS IN WORDS:
DOLLARS
AND CENTS.
NOTE: THE ESTIMATED QUANTITIES SHOWN HEREIN ARE APPROXIMATE AND ARE TO BE USED ONLY AS COMPARISON OF BIDS. AWARD SHALL BE ON THE BASIS OF BASE BID ONLY.PAYMENT FOR QUANTITIES WILL BE MADE FOR ACTUAL MATERIALS USED ON THE JOB. THE CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE
AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ALL OR ANY ITEM FROM THE CONTRACT. IF THERE IS A CONFLICT BETWEEN THE UNIT PRICE PROVIDED AND TOTAL COST, THE UNIT PRICE SHALL PREVAIL. IF THERE IS A CONFLICT BETWEEN THE “TOTAL BASE BID FIGURES” AND THE “TOTAL BASE BID IN WORDS”, THE “TOTAL BASE BID IN WORDS” SHALL PREVAIL.
1774061.2 P-13 LH 6909-01/2023
CITY OF LAGUNA HILLS
PROPOSAL BID SHEETS
FOR
COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT CIP 170
PROPOSAL
IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all forenamed principals this day of , 20 .
BIDDER
Subscribed and sworn to before me BY: __________________________ this day of , 20 (Print Name)
(Signature of Notary Public) (Signature)
(Attach Jurat) TITLE: _______________________
(SEAL)
CITY acknowledges that this proposal was received and opened at the time and in the place specified, and that it was accompanied by the required guarantee in the minimum amount of ten percent (10%) of the total bid.
By:
Title:
1774061.2 P-14 LH 6909-01/2023
BIDDER'S NAME:
BIDDER’S CERTIFICATION FOR
ACKNOWLEDGEMENT OF COMPLIANCE WITH INSURANCE
REQUIREMENTS FOR PUBLIC WORKS CONSTRUCTION
CITY OF LAGUNA HILLS
BIDDER agrees, acknowledges and is fully aware of the insurance requirements as specified in the INSTRUCTIONS TO BIDDERS FOR FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170 AND IN THE SPECIAL PROVISIONS FOR FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170 and accepts all conditions and requirements contained therein.
Bidder
By Date
***** SUBMIT THIS EXECUTED FORM WITH THE BID
1774061.2 P-15 LH 6909-01/2023
BIDDER'S NAME:
BIDDER’S CERTIFICATION FOR
BUY AMERICA REQUIREMENTS
Attention is directed to the "Buy America" requirements of the Surface Transportation Assistance Act of 1982 (Section 165) and the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) Sections 1041(a) and 1048(a), and the regulations adopted pursuant thereto. In accordance with said law and regulations, all manufacturing processes for steel and iron materials furnished for incorporation into the work on this project shall occur in the United States; with the exception that pig iron and processed, pelletized and reduced iron ore manufactured outside of the United States may be used in the domestic manufacturing process for such steel and iron materials. The application of coatings, such as epoxy coating, galvanizing, painting, and any other coating that protects or enhances the value of such steel or iron materials shall be considered a manufacturing process subject to the "Buy America" requirements.
A Certificate of Compliance, conforming to the provisions in Section 6-1.07, "Certificates of Compliance," of the Standard Specifications, shall be furnished for steel and iron materials. The certificates, in addition to certifying that the materials comply with the specifications, shall also specifically certify that all manufacturing processes for the materials occurred in the United States, except for the exceptions allowed herein.
The requirements imposed by said law and regulations do not prevent a minimal use of foreign steel and iron materials if the total combined cost of such materials used does not exceed onetenthof one percent (0.1%) of the total contract cost or $2,500, whichever is greater. The Contractor shall furnish the City with acceptable documentation of the quantity and value of any foreign steel and iron prior to incorporating such materials into the work.
Bidder
By Date
***** SUBMIT THIS EXECUTED FORM WITH THE BID
1774061.2 CA-1 LH 6909-01/2023
CITY OF LAGUNA HILLS
CONTRACT AGREEMENT
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
THIS CONTRACT AGREEMENT (hereinafter “Agreement” or “Contract” or “Contract Agreement”) is made and entered into for the above stated Project this day of , 20 , BY AND BETWEEN THE CITY OF LAGUNA HILLS, as CITY, and , as CONTRACTOR.
WITNESSETH that CITY and CONTRACTOR have mutually agreed as follows:
ARTICLE I
The contract documents for the aforesaid Project shall consist of the Notice Inviting Sealed Bids, Instructions to Bidders, Proposal Documents, Contract Documents, General Specifications, Standard Specifications, Special Provisions, Plans, and all referenced specifications, details, standard drawings, and all appendices attached hereto, together with this Contract Agreement and all required bonds, insurance coverage, permits, notices, and affidavits; and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to ensure its completion in an acceptable manner (hereinafter collectively the “Contract Documents”). All of the provisions of said Contract Documents are attached hereto and are incorporated by reference herein and made a part of this Contract Agreement as though fully set forth herein.
ARTICLE II
For and in consideration of the payments and agreements to be made and performed by CITY, CONTRACTOR agrees to furnish all materials and perform all work required for the above stated project, and to fulfill all other obligations as set forth in the aforesaid Contract Documents.
ARTICLE III
CONTRACTOR agrees to receive and accept the prices set forth in the Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid Contract Documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work. Notwithstanding any provisions of this Agreement to the contrary, CITY and CONTRACTOR mutually agree that CITY’s maximum cumulative payment obligation hereunder (including CONTRACTOR’s profit) shall be Dollars ($0.00), which shall include all amounts payable to CONTRACTOR for its subcontracts, leases, materials and costs arising from, or due to termination of, this Agreement.
ARTICLE IV
CITY hereby promises and agrees to employ, and does hereby employ, CONTRACTOR to provide the materials, do the work, and fulfill the obligations according to the terms and conditions
1774061.2 CA-2 LH 6909-01/2023
herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in the Contract Documents.
ARTICLE V
CONTRACTOR acknowledges the provisions of the Labor Code requiring every employer to be insured against liability for workers’ compensation, or to undertake self-insurance in accordance with the provisions of that code, and certifies compliance with such provisions.
ARTICLE VI
CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this Agreement represent all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest herein.
ARTICLE VII
CONTRACTOR hereby represents and warrants that it will comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C. Section 1101, et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should CONTRACTOR so employ such unauthorized aliens for the performance of any work and/or services under this Agreement, and should any liability or sanctions be imposed against CITY for such use of unauthorized aliens, CONTRACTOR hereby agrees to reimburse CITY for any and all liabilities, actions, suits, claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, orders, or penalties which arise out of or are related to such employment, together with any and all costs, including attorneys' fees, incurred by CITY.
ARTICLE VIII
To the fullest extent permitted by law, CONTRACTOR shall defend (at CONTRACTOR's sole cost and expense), indemnify, protect, and hold harmless CITY, its elected and appointed officials, officers, employees, agents, and volunteers (collectively the “Indemnified Parties”), from and against any and all liabilities, actions, suits, claims, demands, losses, costs, judgments, arbitration awards, settlements, damages, demands, orders, penalties, and expenses including legal costs and attorney fees (collectively “Claims”), including but not limited to Claims arising from injuries to or death of persons (CONTRACTOR’s employees included), or for damage to property, including property owned by CITY, which Claims arise out of, pertain to, or are related to CONTRACTOR's performance under the Agreement. Under no circumstances shall the insurance requirements and limits set forth in this Agreement be construed to limit CONTRACTOR's indemnification obligation or other liability hereunder. Notwithstanding the foregoing, such obligation to defend, hold harmless, and indemnify the CITY, its elected and appointed officials, officers, employees, agents, and volunteers, shall not apply to such claims or liabilities arising from the sole or active negligence or willful misconduct of CITY.
ARTICLE IX
CONTRACTOR shall be familiar with, observe, and comply at all times during the term of this Agreement with any work rules for contractors as may be established and promulgated by the City Manager, which work rules shall be additional terms and conditions for providing the work and services to the CITY pursuant to this Agreement, as may be updated and/or amended from time to time at the sole discretion of the City Manager. [SIGNATURES ON NEXT PAGE]
1774061.2 CA-3 LH 6909-01/2023
CONTRACT AGREEMENT
IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed the day and year first written.
CITY: CONTRACTOR:
___________________________________ ___________________________________
BOB WINGENROTH, CITY MANAGER (CORPORATION (NAME - TYPE))
CITY OF LAGUNA HILLS
BY: ________________________________
(PRINT)
ATTEST: ___________________________________
(SIGNATURE)
___________________________________ _________________________________
JOSHUA STEVENSON, CMC, CITY CLERK (TITLE)
CITY OF LAGUNA HILLS
BY: _______________________________
(PRINT)
___________________________________ ___________________________________
COLIN BURNS, CITY ATTORNEY (SIGNATURE)
CITY OF LAGUNA HILLS
_________________________________
(TITLE)
NOTE: SIGNATURES OF CORPORATE OFFICIALS MUST BE NOTARIZED, ATTACH JURAT.
1774061.2 CA-4 LH 6909-01/2023
(Page 1 of 2) Bond Amount $
Bond Number
FAITHFUL PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, on , the City of Laguna Hills, California (“City”) awarded a public works contract (the “Contract”), delineated as Contract No. , for the , as
specified in the Contract , to , a
hereby designated as the “Principal”,
which Contract is attached hereto, and which Contract and all documents incporated thereinby reference are expressly incorporated into this bond by reference.
AND WHEREAS, the Principal is required under the terms of the Contract to furnish a bond for the faithful performance of the Contract.
NOW, THEREFORE, we, the Principal, and (the
“Surety”), an admitted surety insurer in the State of California, are held firmly bound unto the City of Laguna Hills in the sum of and /100
DOLLARS ($ ), lawful money of the United States of America, for the payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
1. If the Principal, its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly do and perform all of the covenants and obligations of the Contract, including the provisions for liquidated damages in said Contract, and including any and all amendments, supplements, and alterations made to the Contract as provided therein, on the Principal’s part to be done and performed at the times and in the manner specified in the Contract, and shall indemnify and save harmless the City, its officers and agents as specified in the Contract, then this obligation shall be null and void, otherwise it shall be and remain in full force and effect;
2. In the event the Principal fails to fully perform all requirements in accordance with the terms and conditions of the Contract, then the Surety shall enforce performance by the Principal or shall pay the City for the same in an amount not exceeding the amount specified in this bond.3. In the event suit is brought upon this bond by the City and judgment is recovered, as part of the obligation secured hereby and in addition to the face amount specified in this bond, the
(DATE OF AWARD)
(NAME OF PROJECT AND/OR DESCRIPTION OF WORK)
(NAME OF CONTRACTOR)
(NAME OF SURETY)
(CONTRACTOR ENTITY TYPE i.e., INC, LLC, ETC)
1774061.2 CA-5 LH 6909-01/2023
FAITHFUL PERFORMANCE BOND
(PAGE 2 OF 2)
Surety shall pay all costs incurred by the City in such suit, including reasonable attorneys’ fees to be fixed by the court.
4. The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations, additions, omissions or other modifications to the terms of the Contract, or in the work to be performed or the material to be furnished under the Contract, or in the specifications or plans, whether or not made pursuant to the terms of the Contract, shall in any manner release either the Principal or Surety or affect the Surety’s obligations on this bond, and it does hereby waive notice of any such changes, extensions, alterations, additions, omissions or other modifications.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named on the day of , 20 .
PRINCIPAL: SURETY:
(Principal Name) (Seal) (Surety Name) (Seal)
By: By:
(Signature) (Signature)
(Print Name and Title) (Print Name and Title)
By: By:
(Signature) (Signature)
(Print Name and Title) (Print Name and Title)
Principal Address and Telephone: Surety Address and Telephone:
Affix Corporate Seals
Attach Notary Acknowledgments for All Signatures
Attach Power-of-Attorney if Executed by Attorney-in-Fact
1774061.2 CA-6 LH 6909-01/2023
(PAGE 1 OF 2)
PAYMENT (LABOR AND MATERIAL) BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, on , the City of Laguna Hills, California (“City”) awarded a public works contract (the “Contract”), delineated as Contract No. , for the , as
specified in the Contract , to , a
hereby designated as the “Principal”,
which Contract is attached hereto, and which Contract and all documents incporated thereinby reference are expressly incorporated into this bond by reference.
AND WHEREAS, the Principal is required under the terms of the Contract to give this bond in connection with the execution of the Contract.
NOW, THEREFORE, we, the Principal, and (the
“Surety”), an admitted surety insurer in the State of California, are held firmly bound unto the City of Laguna Hills in the sum of and /100
DOLLARS ($ ), lawful money of the United States of America, for the payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
1. If the Principal, or its subcontractors, or their respective heirs, executors, administrators, successors or assigns, shall fail to pay (a) any of the persons named in Section 9100 of the California Civil Code, (b) any amounts due under the California Unemployment Insurance Code with respect to work or labor performed under the Contract, or (c) any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Principal and its subcontractors pursuant to Section 13020 of the California Unemployment Insurance Code with respect to such work or labor, then the Surety shall pay for the same, in an aggregate amount not exceeding the sum specified in this bond. In case suit is brought upon this bond, the Surety will pay reasonable attorney’s fees to be fixed by the court.
2. This bond shall inure to the benefit of any of the persons named in Section 9100 of the California Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
(DATE OF AWARD)
(NAME OF PROJECT AND/OR DESCRIPTION OF WORK)
(NAME OF CONTRACTOR)
(NAME OF SURETY)
(CONTRACTOR ENTITY TYPE i.e., INC, LLC, ETC)
1774061.2 CA-7 LH 6909-01/2023
PAYMENT (LABOR AND MATERIAL) BOND
(PAGE 2 OF 2)
3. The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations, additions, omissions or other modifications to the terms of the Contract, or in the work to be performed or the material to be furnished under the Contract, or in the specifications or plans, whether or not made pursuant to the terms of the Contract, shall in any manner release either the Principal or Surety or affect the Surety’s obligations on this bond, and it does hereby waive notice of any such changes, extensions, alterations, additions, omissions or other modifications.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named on the day of , 20 .
PRINCIPAL: SURETY:
(Principal Name) (Seal) (Surety Name) (Seal)
By: By:
(Signature) (Signature)
(Print Name and Title) (Print Name and Title)
By: By:
(Signature) (Signature)
(Print Name and Title) (Print Name and Title)
Principal Address and Telephone: Surety Address and Telephone:
Affix Corporate Seals
Attach Notary Acknowledgments for All Signatures
Attach Power-of-Attorney if Executed by Attorney-in-Fact
1774061.2 CA-8 LH 6909-01/2023
COMPENSATION INSURANCE CERTIFICATE
Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate and shall submit same to the City prior to performing any work on the contract:
“I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of work of this contract.”
Contractor
By:
(PRINT)
(SIGNATURE)
Title
Date
Section 3700 of the Labor Code reads as follows:
"Every employer except the State shall secure the payment of compensation in one or more of the following ways:
"(a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this state. (b) By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his employee."
COMPENSATION INSURANCE CERTIFICATE
TO BE SUBMITTED WITH CONTRACT
1774061.2 GS-1 LH 6909-01/2023
CITY OF LAGUNA HILLS
GENERAL SPECIFICATIONS
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
SCOPE OF WORK
The work to be performed and completed by Contractor consists of sawcutting, removing, and reconstructing curb ramps with yellow tile truncated domes, replacing blue truncated domes with yellow tile truncated domes, and adjusting traffic signal pull boxes to grade, and all other incidental work in this specification document.
LOCATION OF WORK
The Project location is the area bounded by Avenida de la Carlota, Lake Forest Drive, Santa Vittoria Drive, and Ridge Route Drive, as shown on the plans.
TIME OF COMPLETION
The Contractor shall complete all work in every detail within thirty (30) working days after the date of the Notice to Proceed.
TRAFFIC REQUIREMENTS
The Contractor shall provide delineation in accordance with the latest updated version of the California Manual on Uniform Traffic Control Devices (MUTCD). The Contractor shall schedule the order of his work such that no travel lanes are closed before 8:30 A.M. or after 4:30 P.M. daily.
A minimum of one through travel lane and all turning lanes in all directions shall be maintained during construction between 8:30 A.M. and 4:30 P.M. The same number of travel lanes currently in use (at the time of bid) shall be opened to traffic each and every day between 4:30 P.M. and 8:30 A.M. No work that interferes with public traffic shall be performed after 4:30 P.M. or before 8:30 A.M. No street closures shall be made. The traffic signal and traffic signal detectors shall remain operational during the construction until their replacement is scheduled within 5 days of disruption. Night work shall only be allowed with approved, written approval by the City Engineer, at the contractor’s request, and shall be completed at no additional cost if approved.
Separation between travel lanes shall be accomplished by the use of delineators placed at a maximum of 15' on center. Traffic channelization at intersections shall be accomplished by the use of delineators placed at a maximum of 10' on center.
UTILITY REQUIREMENTS
The Contractor is advised of the existence of the utility notification service provided by UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the Contractor with the precise locations of their substructures in the construction area when the Contractor gives at least 48 hours notice to the Underground Service Alert by calling 1(800) 422-4133. Contractor shall provide the City with proof of contact with USA upon request.
The Contractor shall notify the following agencies at least 48 hours in advance of excavating around any of their structures. The utility companies listed below can be contacted as indicated.
1774061.2 GS-2 LH 6909-01/2023
NAME ADDRESS ATTENTION Phone
Number
AT&T 3939 E. Coronado St.
Anaheim, CA 92807
Robert Fleisher 714/618-9129
OCTA 550 S. Main Street
Orange, CA 92613-1584
Kyle Poff 714/560-5816
Southern California
Edison
14155 Bake Parkway
Irvine, CA 92718
Chris Schafer 949/458-4413
El Toro Water District 24251 Los Alisos Blvd.
Lake Forest, CA 92630
Brian Miller 949/837-7050
Ext. 224
Gas Company 1919 South State College
Anaheim, CA 92806
Andrew Alday 714/385-3377
Gas Company Southern
Region Transmission
P. O. Box 1100
Chatsworth, CA 91313
Rosalyn
Squires
818/701-4546
CR&R P.O. Box 1100
San Juan Capistrano, CA 92693-1100
Mike
Campuzano
949/254-1779
Saddleback Unified
School District
25631 Diseno Drive
Mission Viejo, CA 92691
Frank Manzo 949/580-3335
Moulton Niguel Water
District
27500 La Paz Road
Laguna Niguel, CA 92677
Steve Merk 949/425-3538
Cox Communication 27121 Towne Centre Drive
Foothill Ranch, CA 92610
Reynaldo
Castro
949/563-8889
Santa Margarita Water
District
P. O. Box 7005
Mission Viejo, CA 92690-7005
Jaime Aguilar 949/459-6582
San Diego Gas & Electric 662 Camino de los Mares
San Clemente, CA 92673
Attn: Dolphus
D. Davis
949/369-4721
The California Public Utilities Commission mandates that, in the interest of public safety, main line gas valves be maintained in a manner to be readily accessible and in good operating condition.
The Contractor shall notify the Southern California Gas Company (714) 634-3185 at least 2 working days prior to the start of construction.
The Contractor shall exercise extreme care to protect all existing utilities in place whether shown on the plans or not, and shall assume full responsibility for all damage resulting from his operations. The Contractor shall coordinate with each utility company as to the requirements and methods for protection of their facilities during the construction period, and shall be responsible for preparation and processing of any required plans or permits. The Contractor shall assume full responsibility to maintain uninterrupted service for all utilities.
By submitting a bid, the Contractor acknowledges the above referenced utility work to be done in conjunction with this Project. The Contractor shall schedule his work and conduct his operations so as to permit access and time for the required utility work to be accomplished during the progress of the work.
The Contractor shall coordinate with each utility company as to the extent of required work and the time required to do so. The Contractor shall include this time in his schedule. Payment for the above, if any, shall be deemed as included in the items of work as shown on the proposal bid sheet and no additional compensation will be allowed.
1774061.2 GS-3 LH 6909-01/2023
FLOW AND ACCEPTANCE OF WATER
It is anticipated that storm, surface or other waters will be encountered at various times and locations during the work herein contemplated. The Contractor, by submitting a bid, acknowledges that he has investigated the risk arising from such waters and has prepared his bid accordingly, and Contractor, by submitting a bid, assumes all of said risk.
REMOVAL OF WATER
The Contractor shall provide and maintain at all times during construction ample means and devices to promptly remove and properly dispose of all water entering the excavations or other parts of the work. No concrete footing or floor shall be laid in water nor shall water be allowed to rise over them until the concrete or mortar has set at least two (2) hours. Water shall not be allowed to rise unequally against any walls for a period of twenty-eight (28) days. Dewatering for the structures and pipelines shall commence when ground water is first encountered, and shall be continuous until such time as water can be allowed to rise in accordance with the above statement. Dewatering shall be accomplished by well points or some other method which will insure a dry hold and preservation of final lines and grade of the bottoms of excavation, all subject to the approval of the City Engineer.
Dewatering methods and disposal of water from dewatering operations shall be the sole responsibility of the Contractor and shall conform to the requirements of the State Regional Water Quality Control Board, the requirements of the National Pollution Discharge Elimination System (NPDES), and the Federal Clean Water Act. Full compensation for dewatering shall be considered as included in the contract prices paid for the related items of work, and no additional compensation will be allowed therefore.
STANDARD SPECIFICATIONS
The Standard Specifications of the City are contained in the 2024 edition of the STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, also known as the “Greenbook”, including all supplements, as written and promulgated by the Joint Cooperative Committee of the Southern California Chapter of the American Public Works Association and the Southern California District of the Associated General Contractors of California, which is incorporated herein by this reference. Copies of these Standard Specifications are available from the publisher:
BNi Building News
Division of BNi Publications, Inc.
990 Park Center Drive, Suite E
Vista, California 92801
(760) 734-1113
The Standard Specifications set forth above will control the general provisions for this Contract except as amended by the Plans, General Specifications, Special Provisions, or other Contract Documents.
The section numbers of the following Special Provisions coincide with those of the said Standard Specifications. Only those sections requiring amendment, elaboration, addition, or that are specifying options are stated in the Special Provisions.
In case of conflict between the Standard Specifications and the General Specifications or Special Provisions, the General Specifications and Special Provisions shall take precedence over and be used in lieu of such conflicting portions of the Standard Specifications.
1774061.2 GS-4 LH 6909-01/2023
References in the Special Provisions to "CALTRANS Standard Specifications" shall mean the latest edition of the Standard Specifications of the State of California, Department of Transportation. Copies of these specifications and standard drawings may be obtained from:
California Department of Transportation
Publications Distribution Unit
1900 Royal Oaks Drive
Sacramento, California 95815-3800
Telephone (916) 263-0822
Fax (916) 263-0470
References in the Special Provisions to Standard Plans shall mean the Standard Plans for Public Works Construction, latest edition (written and promulgated by the Public Works Standards, Inc.), and, where applicable and as determined and selected by the City Engineer, those specific standard plans of the City of Laguna Hills, the County of Orange and/or the State Department of Transportation, latest editions.
Where the Plans or Specifications describe portions of the work in general terms, but not in complete detail, it is understood that the item is to be furnished and installed complete and in place and that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals, and do all the work involved in executing the contract.
WAGE RATES AND LABOR CODE REQUIREMENTS
The City has determined that the work on this Project requires work of labor categories which are subject to the State of California Department of Industrial Relations prevailing rates of per diem wages.
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Contractor agrees to fully comply with all applicable federal and state labor laws (including, without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the parties that, in connection with the work provided pursuant to the Agreement, Contractor shall bear all risks of payment or non-payment of prevailing wages under California law, and Contractor hereby agrees to defend, indemnify, and hold the City, its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive termination of the Agreement.
Contractor understands and agrees to comply with the following California Labor Code compliance conditions [Labor Code Sections 1720 et seq., 1813, 1860, 1861, 3700]:
a) The Agreement is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works and the awarding public agency (“City”) and Contractor agree to be bound by all the provisions thereof as though set forth in full herein.
b) Contractor shall be registered with the Department of Industrial Relations (“DIR”) in accordance with California Labor Code Section 1725.5 and has provided proof of registration to City prior to the effective date of this Agreement.
1774061.2 GS-5 LH 6909-01/2023
c) Contractor agrees to comply with the provisions of California Labor Code Sections 1771, 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The applicable prevailing wage determination(s) may be obtained at (http://www.dir.ca.qov/OPRUDPreWaqeDetermination.htm), are on file with City, and are available to any interested party upon request. A copy of said rates shall be posted at each job site during the term of this Agreement.
d) Pursuant to California Labor Code Section 1771.4, Contractor’s services are subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor shall post job site notices as prescribed by DIR regulations and furnish the records specified in California Labor Code Section 1776 directly to the Labor Commissioner in the manner prescribed by California Labor Code Section 1771.4(a)(3) and (c)(2). e) Eight (8) hours of labor shall constitute a legal day’s work for all workmen employed in the execution of this Agreement, and the Contractor and any subcontractor shall comply with and be governed by the laws of the State of California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article 3 of the California Labor Code. Contractor shall comply with the provisions of California Labor Code Section 1813 concerning penalties for workers who work excess hours. Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the execution of this Agreement by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the California Labor Code. (See, e.g., Cal. Labor Code §1815.)
f) Pursuant to California Labor Code Section 1771.1, Contractor and any subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the California Public Contract Code, or engage in the performance of any contract for public work on a public works project unless registered with the DIR and qualified to perform public work pursuant to California Labor Code Section 1725.2. It is not a violation of California Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by California Business and Professions Code Section 7029.1 or by California Public Contract Code Section 10164 or 20103.5, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Contractor shall not perform any work under this Agreement with any subcontractor who is ineligible to perform work on the public works project pursuant to Section 1777.1 or 1777.7 of the California Labor Code.
Apprentices
Section 1777.5 requires the Contractor or Subcontractor employing tradesmen in any apprenticeable occupation to apply to an applicable apprenticeship committee that can supply apprentices to the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen to be used in the performance of the Contract.
The Contractor is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in any apprenticeable trade and if other Contractors on the public works site are making such contributions.
Information relative to apprenticeship standards, contributions, wage schedules and other requirements may be obtained from the State Director of Industrial Relations or from the Division of Apprenticeship Standards.
1774061.2 GS-6 LH 6909-01/2023
RESOLUTION OF CONSTRUCTION CLAIMS
California Public Contract Code (PCC) section 9204 as adopted by Assembly Bill 626 prescribes a process to present, confer, and mediate all construction claims relating to the City’s public works project.
“Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or another public improvement of any kind. “Claim” means a separate demand by the Contractor sent by registered mail or certified mail with return receipt requested for (A) a time extension, including, without limitation for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project (B) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled, or the amount the payment of which is disputed by the local agency. (PCC 9204(c)(1)) For any claim subject to this article, PCC section 9204 requires the following:
a) The claim shall be submitted by the Contractor in writing, sent by registered mail or certified mail with return receipt requested and must include the documents necessary to substantiate the claim. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims. However, upon receipt of a claim, the City, and the Contractor may, by mutual agreement, extend the time period provided by statute.
b) For claims of all amounts, the City shall respond within 45 days of receipt of the claim, and provide the claimant a written statement identifying which portion of the claim is disputed and which portion of the claim is undisputed. If the City requires approval from the City Council, and the City Council does not meet within the 45-day period to respond, the City shall have up to three days to issue its response following the City Council meeting. c) For all portions of a claim determined to be undisputed, the City must process payment to the claimant within 60 days of issuing the City’s written determination. d) If the claimant disputes the City’s response, or if the City fails to respond within the time limits provided, the claimant may demand an informal conference to meet and confer for settlement of the issues in dispute. The demand must be sent in writing by registered or certified mail, return receipt requested. Upon receipt of a demand, the City must schedule a meet and confer conference within 30 days for settlement of the disputed claim. e) Within 10 business days following the conclusion of the meet and confer conference, if any portion of the claim remains in dispute, the City shall provide the claimant an addition written statement identifying the portion of the claim that is undisputed and the portion that remains in dispute.
f) For all portions of a claim determined to be undisputed, the City must process payment to the claimant within 60 days of issuing the City’s written determination. g) Any remaining undisputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation in which the parties share the cost evenly. The City and the claimant shall mutually agree on a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree, each party shall select a mediator and those mediators shall jointly select a qualified, neutral third party to mediate the remaining undisputed claim. Each party shall bear the respective costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is
1774061.2 GS-7 LH 6909-01/2023
unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside of PCC section 9204.
Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under PCC Section 20104.4 to mediate after litigation has been commenced.
PCC Section 9204 does not preclude the City from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program if mediation under this section does not resolve the parties’ dispute.
Should the City fail to respond to a claim, or fail to issue written statements as required, the Contractor’s claim is deemed denied. A claim denied by reason of the City’s failure to respond shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
Amounts not paid in a timely manner as required by PCC 9204 shall bear interest at seven percent per annum.
NOTICE OF THIRD-PARTY CLAIMS
In accordance with PCC Section 9201, the City will provide timely notification to Contractor of the receipt of any third-party claim relating to the Agreement. The Contractor agrees to reimburse the City for its reasonable costs incurred in providing such notice.
CLAYTON ACT AND CARTWRIGHT ACT
In accordance with Section 7103.5 of the Public Contract Code, in entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, and interest in and all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties.
1774061.2 SP-1 LH 6909-01/2023
CITY OF LAGUNA HILLS
SPECIAL PROVISIONS
FOR
FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
PART 1 - GENERAL PROVISIONS
SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS. 1-2 DEFINITIONS.
City City of Laguna Hills
Board City Council
Caltrans California Department of Transportation
County County of Orange
Engineer City Engineer
Federal United States of America
State State of California
Contractor Contractor, its workers, employees and agents Project FY 26-27 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP IMPROVEMENT PROJECT, CIP 170
1-3 ABBREVIATIONS.
1-3.2 Common Usage. [Add the following to this section]:
MUTCD Manual of Uniform Traffic Control Devices, including the California Supplement
OCPW Orange County Public Works Department
SPPWC Standard Plans for Public Works Construction
SSPWC Standard Specifications for Public Works Construction FHWA Federal Highway Administration
HUD Housing and Urban Development
1-7 AWARD AND EXECUTION OF CONTRACT.
Within three (3) days of bid opening contractor must submit:
If a bid bond is submitted with a 10% of Bid designation for the amount as noted in the City Approved Bid Bond form, a revised Bid Bond with numerical dollar values, both in words and with digits, shall be submitted to the City within three (3) days of bid opening.
Within five (5) working days after the date of the Notice of Apparent Low Bidder, the Contractor shall execute and return the following documents to the City:
All Insurance Requirements set forth herein
Two (2) Original Signed Contract Agreements
1774061.2 SP-2 LH 6909-01/2023
Within ten (10) working days after the date of the Notice of Award, the Contractor shall execute and return the following documents to the City:
• Faithful Performance Bond
• Material and Labor Bond
• Construction Schedule
• Water Pollution Control Plan
• Form W-9
• Construction Materials Submittals
FAILURE TO COMPLY WITH ALL OF THE ABOVE WILL RESULT IN ANNULMENT OF THE
AWARD AND FORFEITURE OF THE PROPOSAL GUARANTEE AT THE SOLE DISCRETION OF City.
The Contract Agreement shall not be considered binding upon the City until executed by the authorized City officials. A corporation to which an award is made may be required, before the Contract Agreement is executed by the City, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and that the officers signing the Contract and bonds for the corporation have the authority to do so. 1-7.2 Contract Bonds. [Replace section with the following]:
Both the Faithful Performance Bond and the Material and Labor Bond shall each be for not less than one hundred percent (100%) of the total Contract amount. The Material and Labor Bond shall remain in force until thirty-five (35) days after the date of recordation of the Notice of Completion. The Faithful Performance Bond will be held for one year after the date of recordation of the Notice of Completion.
Prior to the acceptance of any bond, the City shall verify that the surety is an admitted surety in the State of California. If requested by the City, the Contractor shall provide other information specified in the Code of Civil Procedure Section 995.660 to enable the City to verify the sufficiency of the bond.
Should any bond become insufficient, the Contractor shall correct the insufficiency within ten (10) calendar days after receiving notice from the City. The Contractor shall provide the City with evidence of the correction within ten (10) calendar days of said correction. Should any surety at any time be unsatisfactory to the City, written notice will be given to the Contractor to that effect.
No further payments shall be deemed due or will be payable under the Contract until Contractor submits an acceptable bond from a surety accepted by the City. Changes to the work or extensions of time made pursuant to the Contract Agreement shall in no way release the Contractor or the surety from its obligations. Notice of such changes or extensions shall be waived by the surety.
SECTION 2 – SCOPE OF WORK.
2-1.1 PLANS AND SPECIFICATIONS [Add the following to this section]:
The Contractor shall maintain a control set of Plans and Specifications on the Project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on this control set to show the as-constructed conditions.
Upon completion of all work, the Contractor shall return the control set to the Engineer. Final payment will not be made until this requirement has been met. 2-2 PERMITS. [Add the following to this section]:
1774061.2 SP-3 LH 6909-01/2023
Prior to the start of any work, the Contractor shall take out the applicable City and State permits and make arrangements for City and State inspections. Requests for inspections shall be made to the City at least 24 hours in advance of need. The Contractor and all subcontractors shall each obtain any and all other permits, licenses, inspections, certificates, or authorizations required by any governing body or public utility. Payment for this work shall be included in the bid items of work and no additional compensation will be allowed. The City will waive the usual City encroachment permit fees.
Further, Contractor shall ensure that its employees, agents, contractors, and subcontractors conduct themselves in compliance with such laws and licensure requirements including, without limitation, compliance with laws applicable to nondiscrimination, sexual harassment, and ethical behavior throughout the duration of the Contract. Contractor shall not retain or employ an unlicensed subcontractor to perform work pursuant to this Contract. Contractor shall notify the City immediately and in writing of its employees’, agents’, contractors’ or subcontractors’ inability to obtain or maintain, irrespective of the pendency of any appeal, any such licenses, permits, approvals, certificate, waivers, and exemptions that may be required. Such inability shall be cause for termination of this Contract
2-3 RIGHT-OF-WAY. [Add the following to this section]:
The City will acquire all rights of way, easements and rights of entry as required for this Project.
The Contractor shall verify that the acquisition(s) is completed prior to beginning any work outside of the public right of way. All cost for re-mobilization, downtime, etc. due to delays in obtaining the required rights of way, easements and rights of entry shall be included in all other items of work and no additional compensation will be allowed. In the event the required easements have not yet been acquired by the City, the Contractor shall conduct its operation so as to confine its work to the limits of the existing right-of-way.
2-4 COOPERATION AND COLLATERAL WORK. [Add the following]:
The Contractor is advised as to the possibility of other construction projects within the proposed construction zone by the City of Laguna Hills, other governing agencies or private enterprises. In the event of such projects, the Contractor shall coordinate with the applicable parties as to the extent of any time required to complete their work and shall schedule his work and conduct his operations so as to permit access and time as required for the concurrent work. The Contractor shall immediately notify the Engineer in the event of a delay in scheduling caused solely by this concurrent work. Payment for the above, if any, shall be deemed as included in various items of work, including any delay impacts, as shown on the proposal bid sheet and no additional compensation will be allowed.
2-8 EXTRA WORK.
2-8.2 Payment.
2-8.3 Markup.
(a) Work by Contractor. [Add the following to this section]: The following percentages shall be the maximum added to the Contractor's costs and shall constitute the markup for all overhead and profits:
1) Labor 20%
2) Materials 15%
1774061.2 SP-4 LH 6909-01/2023
3) Equipment Rental 15%
4) Other Items and Expenditures 15%
To the sum of the costs and markups provided for in this subsection, 1 percent shall be added as compensation for bonding.
(b) Work by Subcontractor. [Add the following to this section]: When all or any part of the extra work is performed by a Subcontractor, the markup established in 3-3.2.3(a) shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of five (5) percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
The markups mentioned hereinafter shall include, but are not limited to, all costs for the services of superintendents, project managers, timekeepers and other personnel not working directly on the change order and pickup or yard trucks used by the above personnel. These costs shall be reported as labor or equipment elsewhere except when actually performing work directly on the change order and then shall only be reported at the labor classification of the work performed.
The costs of rental equipment shall not exceed the equipment rental rates in the surcharge and Equipment Rental Rates, as published by the State of California Business, Transportation, and Housing Agency and the California Department of Transportation, Division of Construction for the current fiscal year.
2-10 DISPUTED WORK. [Add the following to this section]:
If the Contractor and the City are unable to reach an agreement on disputed work, the City may direct the Contractor to proceed as directed. The City shall have the option, at its own discretion, to pay for said work through unilateral change order executed by the City after conducting its own analysis of the reasonable costs thereof. Although not to be construed as proceeding under extra work provisions in Section 3-3, the Contractor shall keep and furnish records of disputed work in accordance with Section 3-3.
In any case where the Contractor believes extra compensation is due the Contractor for work or materials not clearly covered in the Contract, or not ordered by the City as “extra work”, the Contractor shall notify the City in writing of the Contractor's intention to make claim for such extra compensation before the Contractor begins the work on which Contractor bases the claim. If such notification is not given, or the City is not afforded proper supporting documentation by the Contractor for keeping strict account of actual cost, then the Contractor shall be deemed to have waived the claims for such extra compensation. Such notice by the Contractor, and the fact that the City has kept account of the cost as aforesaid, shall not in any way be construed as proving the validity of the claim. The validity of the claim must be determined by the City. If the City determines that the claim is well founded, it shall be allowed and paid for as “extra work”; if the City determines that the claim is not well founded, it shall be disallowed and not paid.
SECTION 3 – CONTROL OF THE WORK.
3-10 SURVEYING.
3-10.3 Survey Services. [Add sub-section]:
1774061.2 SP-5 LH 6909-01/2023
The Contractor will provide the surveying and the construction staking, if required for the construction of this Project.
The Contractor shall establish benchmarks, elevations, lines and grades and any other necessary controls which are not established by the Engineer and which are necessary to complete the work.
SECTION 4 - CONTROL OF MATERIALS
4-3 INSPECTIONS.
4-3.1 General. [Add the following to this section]:
The City will pay for inspection and materials testing. The Contractor shall pay for retests and reinspections due to failure to meet Specifications. If the Contractor elects to work under this Contract more than 8 hours/day or more than 40 hours/week, Saturday, Sunday, or City holidays, it shall arrange with the Engineer for the required inspection service and pay the Special Inspection Fees as provided by the Material Inspector and City Engineer. When Special Inspection is required, the Contractor shall notify the City and pay inspection fees 24 hours in advance. A 24 hour advance notice will be given during working hours, exclusive of Saturday, Sunday or City holidays for the purpose of permitting the Engineer to make necessary assignments of his representatives. If the Contractor is directed by the City to work under this Contract more than 8 hours/day or more than 40 hours/week, the Special Inspection Fee requirements will be waived.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-1 LAWS AND REGULATIONS. [Add the following to this section]:
The Contractor, and all subcontractors, suppliers and vendors, shall comply with all City, State, and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments.
The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers.
5-3 LABOR.
5-3.3 Payroll Records. [Add the following to this section]:
Contractor shall comply with the provisions of California Labor Code Section 1776 which, among other things, require Contractor and each subcontractor to (1) keep accurate payroll records, (2) certify and make such payroll records available for inspection as provided by Section 1776, and (3) inform the City of the location of the records. The Contractor is responsible for compliance with Section 1776 by itself and all of its subcontractors. Verified payroll records shall be submitted to the City by the tenth day of each month. Progress payments will be withheld pending receipt of any outstanding reports.
5-4 INSURANCE.
5-4.5 Compliance with Insurance Requirements. [Add the following to this section]:
1774061.2 SP-6 LH 6909-01/2023
Contractor shall obtain, maintain, and keep in full force and effect during the term of this Agreement, at its sole cost and expense, and in a form and content satisfactory to City, all insurance required under this section. Contractor shall not commence any work or services under this Agreement unless and until it has provided evidence satisfactory to City that it has secured all insurance required under this section. If Contractor’s existing insurance policies do not meet the insurance requirements set forth herein, Contractor agrees to amend, supplement or endorse the policies to do so.
5-4.5.1 Types of Insurance Required. [Add the following to this section]:
As a condition precedent to the effectiveness of this Agreement, and without limiting the indemnity provisions set forth in this Agreement, Contractor shall obtain and maintain in full force and effect during the term of this Agreement, including any extension thereof, the following policies of insurance:
A. Commercial General Liability Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Commercial General Liability Insurance (Insurance Services Office form CG 00 01) written on an occurrence basis with limits of at least two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) in the general aggregate, and four million dollars ($4,000,000.00) for completed operations aggregate. Defense costs shall be paid in addition to the limits. The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; or (3) contain any other exclusion contrary to the Agreement.
B. Automobile Liability Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Automobile Liability Insurance (Insurance Services Office form CA 001) written on a per occurrence basis with limits of at least one million dollars ($1,000,000.00) combined limit for each occurrence covering bodily injury and property damage. The policy shall specifically include coverage for owned, non-owned, leased, and hired automobiles.
C. Workers’ Compensation Insurance. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Workers’ Compensation Insurance in at least the minimum statutory amounts, and in compliance with all other statutory requirements, as required by the State of California. Contractor agrees to waive and obtain endorsements from its workers’ compensation insurer waiving all subrogation rights under its workers’ compensation insurance policy against the City, its officials, officers, employees, agents and volunteers, and to require each of its subcontractors, if any, to do likewise under their workers’ compensation insurance policies. Contractor shall obtain and maintain, in full force and effect throughout the term of this Agreement, a policy of Employer’s Liability Insurance written on a per occurrence basis with limits of at least one million dollars ($1,000,000.00) per accident for bodily injury or disease.
5-4.5.2 Acceptability of Insurers. [Add the following to this section]:
Insurance required by this section shall be issued by a licensed company authorized to transact business in the state by the Department of Insurance for the State of California with a current rating of A-:VII or better (if an admitted carrier), or a current rating of A:X or better (if offered by a non-admitted insurer listed on the State of California List of Approved Surplus Line Insurers (LASLI), by the latest edition of A.M. Best’s Key Rating Guide, except that the City will accept workers’ compensation insurance from the State Compensation Fund. In the event the City determines that the work or services to be performed under this Agreement creates an increased
1774061.2 SP-7 LH 6909-01/2023
or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies may be changed accordingly upon receipt of written notice from the City.
Contractor shall immediately substitute any insurer whose A.M. Best rating drops below the levels specified herein.
5-4.5.3 Insurance Endorsements. [Add the following to this section]:
Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for written approval. Required insurance policies shall contain the following provisions, or Contractor shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
A. The policy or policies of insurance required by this section for Commercial General Liability and Automobile Liability Insurance shall be endorsed to provide the following:
(1) Additional Insured: The City, its officials, officers, employees, agents and volunteers, shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement; and
(2) Additional Insured Endorsements: Additional insured endorsements shall not (1) be restricted to “ongoing operations”, (2) exclude “contractual liability”, (3) restrict coverage to “sole” liability of Contractor, or (4) contain any other exclusions contrary to the Agreement; and, the coverage shall contain no special limitations on the scope of protection afforded to additional insureds.
(3) Notice: The policy or policies of insurance required by this section for Commercial General Liability and Automobile Liability Insurance shall be endorsed to state that coverage shall not be suspended, voided, cancelled, or modified, or reduced in coverage or in limits, except after thirty (30) days prior written notice by First Class U.S. Mail, postage-prepaid, has been provided to the City. Notwithstanding the foregoing, if coverage is to be suspended, voided, or cancelled because of Contractor’s failure to pay the insurance premium, the notice provided to City shall be by ten (10) days prior written notice.
B. For all policies of Commercial General Liability Insurance, Contractor shall provide endorsements for completed operations to effectuate this requirement. 5-4.5.4 Deductibles and Self-Insured Retentions.
Any deductible or self-insured retention must be approved in writing by the City in advance and shall protect the City, its officials, officers, employees, agents and volunteers, in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.
5-4.5.6 Primary and Non-Contributing Insurance.
All policies of Commercial General Liability Insurance and Automobile Liability Insurance shall be primary and any other insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents or volunteers, shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions. 5-4.5.7 Waiver of Subrogation.
1774061.2 SP-8 LH 6909-01/2023
All policies of Commercial General Liability and Automobile Liability Insurance shall contain or be endorsed to waive subrogation against the City, its officials, officers, employees, agents and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with the requirements set forth in this section to waive their right to recovery prior to a loss. Contractor hereby agrees to waive its own right of recovery against the City, its officials, officers, employees, agents and volunteers, and Contractor hereby agrees to require similar written express waivers and insurance clauses from each of its subcontractors. 5-4.5.8 Evidence of Coverage.
Concurrently with the execution of the Agreement, Contractor shall deliver certificates of insurance together with original endorsements affecting each of the insurance policies required by this section. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for written approval. The certificates of insurance and original endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. Contractor shall promptly furnish, at City’s request, copies of actual policies including all declaration pages, endorsements, exclusions and any other policy documents City requires to verify coverage. 5-4.5.9 Requirements Not Limiting.
Requirement of specific coverage or minimum limits contained in this section are not intended as a limitation on coverage, limits, or other requirements, or a waiver of any coverage normally provided by any insurance. Nothing in this section shall be construed as limiting in any way the indemnification provision contained in this Agreement, or the extent to which Contractor may be held responsible for payments of damages to persons or property. 5-4.5.10 Enforcement of Agreement (Non-Estoppel).
Contractor acknowledges and agrees that actual or alleged failure on the part of the City to inform Contractor of any non-compliance with any of the insurance requirements set forth in this section imposes no additional obligation on the City nor does it waive any rights hereunder.
1774061.2 SP-9 LH 6909-01/2023
5-4.5.11 Insurance for Subcontractors.
Contractor shall either: (1) include all subcontractors engaged in any work or services for Contractor relating to this Agreement as additional named insureds under the Contractor’s insurance policies; or (2) Contractor shall be responsible for causing its subcontractors to procure and maintain the appropriate insurance in compliance with the terms of the insurance requirements set forth in this section, including adding the City, its officials, officers, employees, agents and volunteers, as additional insureds to their respective policies. All policies of Commercial General Liability Insurance provided by Contractor’s subcontractors performing any work or services related to this Agreement shall be endorsed to name the City, its officials, officers, employees, agents and volunteers, as additional insureds. Contractor shall not allow any subcontractor to commence any work or services relating to this Agreement unless and until it has provided evidence satisfactory to City that the subcontractor has secured all insurance required under this section.
5-4.5.12 Other Insurance Requirements.
The following terms and conditions shall apply to the insurance policies required of Contractor pursuant to this Agreement:
A. Contractor shall provide immediate written notice to City if (1) any of the insurance policies required herein are terminated, cancelled or suspended, (2) the limits of any of the insurance coverages required herein are reduced, or (3) the deductible or self-insured retention is increased.
B. All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to each insured, including additional insureds, against whom a claim is made or suit is brought to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operations shall limit the application of such insurance coverage.
C. None of the insurance coverages required herein will be in compliance with the requirements of this section if they include any limiting endorsement which substantially impairs the coverages set forth herein (e.g., elimination of contractual liability or reduction of discovery period), unless the endorsement has first been submitted to the City and approved in writing.
D. Certificates of insurance will not be accepted in lieu of required endorsements, and submittal of certificates without required endorsements may delay commencement of the Project.
It is Contractor’s obligation to ensure timely compliance with all insurance submittal requirements as provided herein.
E. Contractor agrees to ensure that subcontractors, if any, and any other parties involved with the Project who are brought onto or involved in the Project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the Project will be submitted to the City for review.
F. Contractor agrees to provide immediate written notice to City of any claim, demand or loss against Contractor arising out of the work or services performed under this Agreement and for any other claim, demand or loss which may reduce the insurance available to pay claims, demands or losses arising out of this Agreement.
1774061.2 SP-10 LH 6909-01/2023
5-4.5.13 Contractor's Liability; City Not Liable; Claims Resolution A. Contractor’s liability. The Contractor shall be responsible for any loss or damage that may occur to:
The work or any part thereof;
Any of the materials or other things used or employed in performing the work; Any injury to any person or persons, either workers or the public; Any damage to property resulting from any cause which might have been prevented by the Contractor, including defects or obstructions at any time before completion of the work and its final acceptance.
B. City ordered precautions. If, in the opinion of the City Engineer, the precautions taken by Contractor are not safe or adequate at any time during the term of the Contract, the City Engineer may order the Contractor to take further precautions, and if the Contactor shall fail to do so, the City Engineer may order the work done by others and charge the Contractor for the cost thereof, such cost to be deducted from any moneys due or becoming due the Contractor. Failure of the City Engineer to order such additional precautions, however, shall not relieve the Contractor from his full responsibility for public safety.
C. City not liable. The City shall not be answerable or accountable in any manner, for any loss or damage that may occur to any of the following from any cause which might have been prevented by the Contractor:
The work or any part thereof;
Any of the materials or other things used or employed in performing the work; Any injury to any person or persons, either workers or the public; Any damage to property.
D. Claims Resolution. From time to time during the period of this contract, the City and/or the Contractor may be served with third-party claims, as a result of alleged conduct by Contractor. The following procedures shall be followed by City and Contractor:
For claims received by Contractor:
(1) Contractor shall provide City on a monthly basis details regarding any claim for damages to persons or property, including, date claim made, date of alleged damages, type of damages, alleged cause of damages and, as claims are resolved, details regarding Contractor’s denial or payment of such claim and the reasons for denial or payment. (2) Contractor shall resolve or deny any claim received within thirty (30) days of receipt. If Contractor is unable to resolve a claim within the thirty (30) days set forth above, it shall, prior to the expiration of the thirty (30) days request and extension in writing from the City.
For claims received by City:
(1) City shall process any claims received pursuant to Chapter 3-12 (Claims Against the City) of the Laguna Hills Municipal Code.
1774061.2 SP-11 LH 6909-01/2023
(2) If after investigation of the claim, the City determines the Contractor is liable under this Contract, City shall tender the claim to the Contractor for proper handling and resolution.
E. Retention of Claimed Damages by City. The City may retain so much of the money due the Contractor under and by virtue of the Contract as shall be considered necessary by the City until disposition has been made of such suits or claims for damages aforesaid. 5-7 SAFETY.
5-7.1.3 Traffic and Access. [Add the following to section]:
When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall in all cases yield to public traffic.
The Contractor shall notify in writing all affected property owners of the proposed construction schedule a minimum of forty-eight (48) hours, but not more than seventy-two (72) hours, in advance of any limitation or closure of access to their property. Form of said notice shall be as approved by the Engineer and shall contain the date and time of the closure. In the event of delay, whether beyond the control of the Contractor or not, the Contractor shall notify all affected property owners as to the extent of the delay and his revised schedule. In the event of delay over 72 hours, the Contractor shall re-notify the property owners as described above. Payment for notification and coordination as per Section 7-10 as modified herein shall be included in the compensation paid for the various items of work and no additional compensation will be allowed. The "Notices" will be furnished by the Contractor.
Pedestrian access shall be maintained at all times during construction and shall be in accordance with the Americans With Disabilities Act.
5.7.2 Safety Orders
5.7.2.1 General. [Add the following to this section]:
The Contractor shall comply with the provisions of any City ordinances or regulations regarding requirements for the protection of excavations and the nature of such protection.
In accordance with Section 6500 of the Labor Code, the Contractor is required to obtain a permit from the Division of Industrial Safety for any trench or excavation which if five feet or more in depth and into which a person is required to descent.
In accordance with Section 6705 of the Labor Code, prior to any excavation involving an expenditure in excess of twenty-five thousand dollars ($25,000) for the excavation of any trench or trenches five (5) feet or more in depth, Contractor shall submit to Engineer a written detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches.
Prior to beginning of excavations requiring shoring, the Contractor shall designate in writing to the Engineer someone whose responsibility it is to supervise the Project safety measures and someone whose responsibility it is to supervise the installation and removal of sheeting, shoring and bracing.
In addition to shoring the excavations in accordance with the minimum requirements of Industrial Safety Orders, it shall be the Contractor's responsibility to provide any and all additional shoring
1774061.2 SP-12 LH 6909-01/2023
required to support the sides of the excavation against the effects of load which may exceed those desired by using the criteria set forth in the Industrial Safety Orders. The Contractor shall be solely responsible for any damages which may result from his failure to provide adequate shoring of the excavation under any and all of the conditions of loading which may exist or which may arise during construction of the Project.
In accordance with Section 7104 of the Public Contract Code, any public works contract which involves excavations that extend deeper than four feet below the surface shall provide as follows:
(a) That the Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any:
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. (2) Subsurface or latent physical conditions at the site differing from those indicated by information about the site made available to bidders prior to the deadline for submitting bids.
(3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally as inherent in work of the character provided for in the contract.
(b) The local public entity shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor's cost of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in the contract. (c) That, in the event that a dispute arises between City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor's cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties.
5-7.2.2.1 Storage of Equipment and Materials in Public Streets. [Add the following section]:
The Contractor is required to, at his own expense, maintain and operate a work and storage area outside of the public right-of-way. In such case the Contractor shall submit to City written authorization from the owners of the subject property prior to occupation. Occupation of site without written authorization shall be grounds for immediate suspension of work. Location of site to be approved by City. Condition and operation of yard shall conform to these specifications. The Contractor shall assume full responsibility for all damage to the site resulting from his operations and shall repair and/or replace same, at his own expense, to the satisfaction of the owner of the subject property. The Contractor shall vacate site and return it to pre-Project condition within five (5) working days following application for Notice of Completion. The Contractor shall obtain a written release from the property owner accepting the condition of the vacated site and releasing the Contractor from any further clean-up or restoration work and shall submit a copy of such release to City. The Notice of Completion will not be issued until said release is submitted. 5-7.2.2.2 Street Closures, Detours, Barricades. [Add the following section]:
1774061.2 SP-13 LH 6909-01/2023
The Contractor shall perform lane closures and all traffic control operations in accordance with the applicable details in the California MUTCD, latest edition. No work shall be performed until the required lane closure traffic control has been installed and approved by the City. If the City does not feel that the Contractor is properly and safely implementing the MUTCD details, then work shall be stopped until such time as the Contractor can successfully remedy the deficiencies.
Portable delineators (traffic cones are not allowed), which conform to the California MUTCD, latest edition, shall be spaced as necessary for proper delineation of the travel way. The spacing between delineators shall not exceed 25 feet. The minimum lane transitions shall be a 50 to 1 taper. Double base delineators will be required.
The Contractor shall schedule the order of his work such that no travel lanes are closed before 8:30 A.M. or after 4:30 P.M. daily. A minimum of one through travel lane and all turning lanes in all directions with flaggers will be required at all times. The same number of travel lanes currently in use shall be opened to traffic during non-working hours. No street closures shall be made unless indicated on the approved traffic control plans. The traffic signal and traffic signal detectors shall remain operational continuously during the construction, and traffic loops that require replacement shall be disrupted no more than 5 calendar days before their replacement.
No weekend work (day or night) will be allowed, unless otherwise specified on the Plans or as approved by the City.
The Contractor shall provide, at his expense, advanced warning signs advising the public of the impending major construction project and his proposed schedule. Said signs shall be posted at all major approaches to the construction zones a minimum of one week prior to the start of construction.
The Contractor shall designate at least one worker solely for the provision and maintenance of traffic control.
The Contractor shall be responsible for providing temporary access to all intersecting streets and driveways throughout the workday and at the end of each workday. A minimum of one access point shall be maintained for each commercial business during their normal business hours.
Pedestrian access shall be maintained at all times and temporary and permanent pedestrian access shall be in accordance with the Americans with Disabilities Act.
The Contractor shall provide and maintain all other signs, barricades, pedestals, flashers, delineators and other necessary facilities for the protection of the public within the limits of the construction area and shall be maintained in a new or like new condition, free of damage and graffiti.
If the traffic delineators are damaged, displaced or not in an upright position, from any cause, said delineators shall immediately be replaced or restored to their original location, in an upright position, by the Contractor.
The Contractor shall furnish competent flagmen to give adequate warning to traffic or to the public of any dangerous conditions to be encountered. Flagmen, while on duty and assigned to give warnings to the public that the highway is under construction and of any dangerous conditions to be encountered as a result thereof, shall perform their duties and shall be provided with the necessary equipment in accordance with the California MUTCD. The equipment shall be furnished and kept clean and in good repair by the Contractor, at Contractor’s expense.
Should the Contractor appear to be neglectful or negligent in furnishing warning and protective measures as provided, the Engineer may direct attention to the existence of a hazard and the
1774061.2 SP-14 LH 6909-01/2023
necessary warning and protective measures shall be furnished and installed by the Contractor at its own expense. Should the Engineer point out the inadequacy of warning and protective measures, such action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate his obligation to furnish and pay for these devices.
Where on-street parking is not allowed, the Contractor shall be required to post "Temporary No Parking" signs 48 hours prior to start of work. The Contractor will furnish the notification to property owners as mentioned in Section 7-10.1 and the “Temporary No Parking” signs.
No construction activities will be allowed on streets that are receiving trash pick-up services on the same day. A copy of the CR&R Waste Collection Map is available on the City’s website. The Contractor shall coordinate with the trash hauler in preparing the construction schedule. The Contractor shall provide a map showing the schedule of the work, which should coordinate with the trash and mail schedule, to the City at the preconstruction meeting.
Contractor shall notify the following entities at least forty-eight (48) hours in advance of any street closure or restriction to access.
1. Fire Department: Orange County Fire Authority, (714) 573-6000
2. Police Department: Orange County Sheriff’s Department, (714) 647-7000
3. School Districts: Saddleback Valley Unified: (949) 586-1234, Capistrano Unified: (949) 489-7000
4. Trash Collection: CR&R, (877) 728-0446
5. Street Sweeping: Sweeping Corp of America, (949) 413-0165
6. Transit Operations: Orange County Transportation Authority (OCTA), (714) 560-6282
7. Fire Department: Station 22, (949) 770-6016
8. Mail Service: US Postal Service
The City Engineer may add additional entities to this list at his discretion.
All existing stop signs, street name signs and regulatory signs shall be maintained in visible locations during construction. Where construction detours and signing conflict with existing signing, the Contractor shall cover existing signs in a manner approved by the City. The Contractor shall also provide temporary traffic restriping, or reflective white or yellow plastic tabs, at the conclusion of each working day, if not sooner, as directed by the City, for any centerline, painted median or lane line that is obliterated by construction.
The Contractor shall provide temporary delineation as directed/approved. Temporary delineation shall include sandblasting of conflicting markings; installation and removal of temporary centerlines or lane lines, detour signing, barricading; and replacement of traffic lines and markings in their proper locations upon termination of the detour. Conflicting existing and temporary striping, as required for traffic control during construction, shall be removed by the Contractor by using wet nozzle sandblasting methods with immediate clean up of residues.
Blacking-out of the pavement striping will not be allowed. Temporary reflective striping tape or reflective plastic tabs may be used, except that it shall not be applied to final asphalt surfaces.
Said tape or tabs shall be removed from temporary surfaces prior to placement of additional asphalt.
1774061.2 SP-15 LH 6909-01/2023
The Contractor shall also be responsible for notifying adjacent businesses, residents (of affected residential tracts), and entities listed above, in writing seven (7) days in advance of any work that involves limited access. Said notice shall be reviewed and approved by the City in advance of its circulation. Contractor shall provide verification to the City that proper circulation of the notice has been accomplished.
The Contractor shall maintain a 24-hour emergency service to remove, install, relocate, and maintain warning devices. No later than 10 days after the award of the Contract, the Contractor shall furnish to the City, names, and telephone numbers of three persons responsible for this emergency service. In the event these persons do not promptly respond when notified, or it becomes necessary to call other forces to accomplish emergency service, the Contractor will be responsible for any cost incurred.
Prior to the start of each work day, the Contractor shall perform all necessary work incidental to and commensurate with the proper signing, detouring, barricading, etc., heretofore and hereinafter specified that is required for that particular day’s schedule of operations. No construction shall be permitted until such signing and detouring operations have been completed and approved by the City.
Personal vehicles of the Contractor's employees shall only be parked in an allowed area as delineated by the City, and shall not be parked on the traveled way at any time, including any section closed to public traffic.
Flashing Arrow Signs:
Each flashing arrow sign shall be solar powered, mounted on a truck or on a trailer and shall be capable of operating while the vehicle is moving or as directed by the City.
Signs mounted on the cab of a truck shall be mounted to provide a minimum of 7 feet between the bottom of the sign and the roadway. Signs mounted on a trailer, or on anything other than the cab of a truck, shall be mounted to provide a minimum of 8 feet between the bottom of the sign and the roadway.
The total weight of trailer mounted flashing arrow sign including the trailer, sign, power source and other components shall not exceed 1,500 pounds and the height of the level trailer bed shall be no higher than 21 inches above the roadway. The trailer shall be equipped with a minimum of 3 leveling jacks.
Alternative types of lamps may be used in flashing arrow signs if visibility is equal to the specified lamps. Each type AX flashing arrow sign shall be a minimum of 2 feet high and 4 feet wide, and shall be finished with flat black enamel. A minimum of 13 No.4414AX 12-volt, yellow or amber lamps shall be installed in the panel. The lamp configuration shall be for 3 arrowheads or an arrow shaft with 2 arrowheads, one pointing in each direction on the face of the sign with a minimum of 5 lamps forming each arrowhead. Each lamp shall be provided with a visor.
The lamp shall be activated by a switch on a control panel and shall be controlled by electronic circuitry to provide a minimum of 4 selectable modes of operation as follows:
1. Pass Left Mode, - Sequencing of lighted arrowheads or sequencing the lamps forming the arrow shaft and arrowhead to the left or a flashing left arrow with the lamps in the arrow shaft and arrowhead flashing on and off simultaneously.
1774061.2 SP-16 LH 6909-01/2023
2. Pass Right Mode, - Sequencing of lighted arrowheads or sequencing the lamps forming the arrow shaft and arrowhead to the right or a flashing right arrow with the lamps in the arrow shaft and arrowhead flashing on and off simultaneously.
3. Simultaneous Mode, - Either the outside arrowheads pointing in opposite directions are continuously illuminated, except for the center lamp forming each arrowhead, while the arrow shaft lamps flash on and off simultaneously or the outside arrowhead pointing in opposite directions and the arrow shaft lamps all flash simultaneously to indicate passing on either side.
4. Travel Mode, - Travel or caution mode shall flash in a manner not resembling any other mode.
Lane Requirements:
There shall be a minimum of 5’ clearance from open excavations and two feet from other obstructions (curbs, k-rail, etc). All lanes shall be open to traffic during non-working hours.
The Contractor shall be required to use flashing arrow signs at all lane closures to direct travel and appropriate detour signing to control traffic through and/or around the construction area.
The Contractor will not be allowed to excavate a larger quantity of area (“digouts”) than can successfully be repaved in the same working day. No incomplete paving work will be allowed to remain during the hours designated as requiring “all” lanes open to traffic, except in specific instances in which a minor amount of area can safely be covered by approved means with non-skid steel plates, capable of carrying H-20 wheel loading, or patched with temporary AC to bring the excavation up to grade. Said temporary AC shall be ground down to permanent AC sub-grades and approved by the City prior to placement of any additional permanent AC.
Excavations of less than 4’ in width may be covered with non-skid steel plates capable of carrying H-20 wheel loading over the span of the excavation. Plates shall have a minimum width equal to the excavation width plus 24 inches and be securely fastened to the street surface. Asphalt fillers, a minimum of 6 inches wide shall be placed around the perimeter of the plate. When traffic is transferred to any type of temporary pavement surface good drivability of the surfaces shall be maintained and shall be subject to approval by the City prior to allowing traffic to be transferred upon it.
The Contractor shall also ensure that access to all side streets and driveways are maintained at all times. Work in front of or within driveways and side streets shall be conducted in a manner where at no time is access to property denied. Portions of driveway approaches that are not ready to be opened for traffic at the end of the workday shall be steel plated per the requirements noted in the previous paragraph. The Contractor shall use temporary AC surfacing at his own expense for traffic control as required to maintain traffic in a safe non-disruptive manner.
SECTION 6 - PROSECUTION AND PROGRESS OF WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.
6-1.0 General. [Add the following section]:
The Contractor's proposed Construction Schedule shall be submitted to the Engineer within ten (10) working days after the date of the Notice of Award of Contract. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged, and setting forth the dates that each item will be
1774061.2 SP-17 LH 6909-01/2023
delivered. The schedule shall establish the order of work which minimizes disruption of existing travel lanes.
Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the respective Contractor to review the proposed Construction Schedule and delivery dates, arrange the utility coordination, discuss construction methods, and clarify inspection procedures.
The Contractor shall submit periodic Progress Reports to the Engineer by the tenth day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Liquidated damages will be assessed pending receipt of any outstanding reports, as set forth in Section 6-9.1 below. 6-1.3 Construction Schedule (Critical Path Method) [Add the following section]:
The Contractor shall submit to the Engineer practicable critical path method (CPM) progress schedules in conformance with these Special Provisions. Whenever the term “schedule” is used in this section it shall mean CPM progress schedule illustrated by the Gantt Bar method. The schedule shall be prepared by qualified and experienced scheduling staff.
Schedules shall show the order in which the Contractor proposes to carry out the work with logical links between time-scaled work activities, and calculations made using the critical path method to determine the controlling operation or operations. The Contractor is responsible for assuring that all activity sequences are logical and that each schedule shows a coordinated plan for complete performance of the work.
The Contractor shall produce schedules using computer software and shall furnish compatible software for the Engineer’s exclusive possession and use. The Contractor shall furnish network diagrams, narrative reports, tabular reports and schedule data as parts of each schedule submittal.
The number of activities shall be sufficient to assure adequate planning of the Project, to permit monitoring and evaluation of progress, and to do an analysis of time impacts.
Schedule activities shall include the following:
A. A clear legible description.
B. Start and finish dates.
C. A duration of not less than one working day, except for event activities, and not more than 20 working days, unless otherwise authorized by the Engineer.
D. At least one predecessor and one successor activity, except for Project start and finish milestones.
E. Required constraints.
F. Codes for responsibility, stage, work shifts, location and contract pay item numbers.
The Contractor may show a scheduled completion date that is later than the Contract completion date on an update schedule, after the baseline schedule is accepted. The Contractor shall provide an explanation for a late scheduled completion date in the narrative report that is included with the schedule.
1774061.2 SP-18 LH 6909-01/2023
The Engineer’s review and acceptance of schedules shall not waive any Contract requirements and shall not relieve the Contractor of any obligation thereunder or responsibility for submitting complete and accurate information. Schedules that are rejected shall be correct by the Contract and resubmitted to the Engineer within five (5) working days of notification by the Engineer, at which time a new review period of one week will begin.
Errors or omissions on schedules shall not relieve the contractor from finishing all work within the time limit specified for completion of the Contract. If, after, a schedule has been accepted by the Engineer, either the Contractor or the Engineer discovers that any aspect of the schedule has an error or omission, it shall be corrected by the Contractor on the next schedule.
Payment for the Project schedule and revisions/updates to the schedule shall be made under other items of work and no additional payment shall be made therefore. 6-1.4 Acceleration. [Add the following section]:
The City reserves the right to accelerate the work of the Contract at any time during its performance. In the event the City directs acceleration, such directive will be given to the Contractor in writing. The Contractor shall keep cost and other Project records related to the acceleration directive separately from the normal Project cost records and shall provide a written record of acceleration costs to the City on a daily basis.
In the event the Contractor believes that some action or inaction on the part of the City constitutes an acceleration directive, the Contractor shall immediately notify the City in writing that the Contractor considers the actions or inactions an acceleration directive. The Contractor shall not accelerate their work efforts until the City responds to the written notification. If acceleration is then directed or required by the City, all cost records referred to in the previous paragraph shall be maintained by the Contractor and provided to the City on a daily basis.
In order to recover additional costs due to acceleration, the Contractor must document that additional expenses were incurred and paid by the Contractor. Labor costs recoverable will only be overtime or shift premium costs or the cost of additional laborers brought to the site to accomplish the accelerated work effort. Equipment costs recoverable will only be the cost of added equipment mobilized to the site to accomplish the accelerated work effort. 6-2 PROSECUTION OF THE WORK [Replace the first sentence the following:] To minimize public inconvenience and possible hazard and to restore street and other work areas to their original condition and state of usefulness as soon as practicable, the Contractor shall diligent prosecute the Work to completion and ensure that the construction of ARHM or FRAC overlay for any given portion of the roadway is completed no later than two (2) working days following the cold-milling of the same portion of roadway. [Add to this section]
Construction Phasing/Scheduling Limitations:
Construction Phasing:
o Contractor shall submit a construction phasing plan to the City for review and approval prior to starting work. Phasing plans shall be prepared in accordance with the phasing requirements and the conditions included in the project specifications.
1774061.2 SP-19 LH 6909-01/2023
Traffic Control:
o Traffic Control setup at each location shall confirm to CA-MUTCD (Latest Edition) requirements and typical applications and shall be maintained on a daily basis by the contractor.
Resident Access:
o Contractor shall ensure that access is maintained in the morning and open by the end of each working day for each resident within the project limits. Working hours, as stated in Section 6-3, shall be maintained, and the contractor’s operations shall be phased in such a manner to allow full access to residents during non-working hours.
Localized Concrete Improvements (Curb/Gutter, Ramps, etc.):
o All concrete improvements shall be completed prior to the start of any pavement grinding or reconstruction activities.
o Contractor’s operations shall be scheduled in such a way that no ramp or portion of sidewalk is left excavated, demolished, or formed over the weekend. o It shall be the contractor’s responsibility to properly barricade the work area during non-working hours and to set up appropriate pedestrian detour/signage until the work is completed
o Driveway access to each property shall be maintained at the end of each working day. Contractor shall ramp or plate the driveways to maintain access. 6-3 TIME OF COMPLETION.
6-3.1 General. [Add the following to this section]:
The time for completion shall be as set forth in the General Specifications. “The Contractor shall complete all work under the Contract within thirty (30) consecutive working days after the date on the Notice to Proceed.
The Contractor shall ensure the availability of all material prior to the start of work. Unavailability of material will not be sufficient reason to grant the Contractor an extension of time for 100 percent completion of work.”
Working Days. “Any City holiday, defined as January 1st, the third Monday in January (Martin Luther King Day), the third Monday in February (President's Day), the last Monday in May (Memorial Day), July 4th, the first Monday in September (Labor Day), November 11th (Veterans Day), the fourth Thursday and Friday in November (Thanksgiving and Friday after), December 24th through December 31st.”
Working Hours. Normal working hours are limited to 8:30 a.m. to 4:30 p.m., Monday through Friday.
1774061.2 SP-20 LH 6909-01/2023
The Contractor, subcontractors, suppliers, etc., shall not generate any noise at the work site, storage sites, staging areas, etc., before or after the normal working hours prescribed above.
Should the Contractor elect to work outside normal working hours, Contractor must first obtain special permission from the Engineer. The request may be for 4:30 p.m. to 6:30 p.m. on weekdays or 8:30 a.m. to 4:30 p.m. on Saturday only. A request for working during any of these hours must be made at least 72 hours in advance of the desired time period. A separate request must be made for each work shift. The Engineer reserves the right to deny any or all such requests. Additionally, the Contractor shall pay for supplemental inspection costs of $205.00 per hour when such time periods are approved.
6-3.2 Contract Time Accounting. [Add the following to this section]:
The Contractor's activities shall be confined to the hours between 8:30 AM and 4:30 PM, Monday through Friday, excluding holidays, unless otherwise specified. Work shall be prohibited any time on Saturday, Sunday or Federal Holidays except as provided herein. Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property.
In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates (premium time) including benefits, overhead, and travel time and are established based on the City’s current fee schedule or professional services agreement for construction inspection services. The service fees will be deducted from any amounts due the Contractor.
Construction activities during City Special Events may be restricted by City to exclude all or part of the work on primary arterial or access roads to the Special Events as determined by Engineer.
The Contractor shall be responsible to ascertain the exact times of any such events within his proposed construction schedule which may restrict his operation and shall adjust his schedule accordingly. The construction restrictions shall only be for the actual days the events occur. All costs for maintaining traffic control, protection of work site and re-mobilization shall be deemed as included in the lump sum contract for their respective items and no additional compensation will be allowed.
6-3.3 Completion, Acceptance, and Warranty. [Add the following section]:
Work will be deemed completed on the same date when the Notice of Completion is recorded with the County of Orange.
6-4 DELAYS AND EXTENSIONS OF TIME.
6-4.1 General. [Add the following to the end of this section:] No time extension shall be granted unless the claimed delay meets each and every of the following conditions:
(a) The delay was caused by unforeseen events and was beyond the control of Contractor and its subcontractors and material suppliers;
(b) The delay was caused by events of which Contractor was not advised at or before the time of bidding;
1774061.2 SP-21 LH 6909-01/2023
(c) The delay impacted and delayed (i) the controlling items of Work (i.e., the as-built critical path, as determined from the as-planned schedule and the actual progress of the Work), or (ii) the Completion of the whole Work within the Contract time; (d) The delay was not caused by Contractor or its subcontractors or suppliers, including but not limited to their breaches of contract or the standard of care; (e) The delay was not associated with loss of time resulting from the necessity of submittals to CITY for approval, or from necessary CITY surveys, measurements, inspections and testing; (f) The delay was not caused by usual or common weather for the time of year, including usual or common severe weather; and
(g) The delay could not have been prevented by the exercise of care, prudence, foresight, and diligence by Contractor.
Excusable delays may include acts of God, acts of public enemy, acts of the Owner or anyone employed by it, acts of another contractor in performance of a contract (other than this Contract) with the CITY, fires, floods, epidemics, quarantine restrictions, labor disputes, unusually and uncommonly severe weather for the time of year, unforeseen site conditions, or delays of subcontractors due to such causes. CITY shall take into consideration other relevant factors such as concurrent delays.
Contractor has the burden of proving that any delay was excusable, including but not limited to an analysis that establishes no concurrency.
No extension of time will be granted for an excusable delay caused by a shortage of materials unless the Contractor furnishes to the Engineer documentary proof that the Contractor has made every effort to obtain the materials from all known sources within reasonable reach of the Work in a diligent and timely manner, and further proof in the form of supplementary progress schedules that the inability to obtain the materials when originally planned did in fact cause a delay in final Completion of the entire Work which could not be compensated for by revising the sequence of the Contractor's operations. The term "shortage of materials" shall apply only to materials, articles, parts or equipment which are standard items and are to be incorporated in the Work. The term "shortage of materials" shall not apply to materials, parts, articles or equipment which are processed, made, constructed, fabricated or manufactured to meet the specific requirements of the contract. Only the physical shortage of material will be considered under these provisions as a cause for extension of time. Delays in obtaining materials due to priority in filling orders will not constitute a shortage of materials. 6-4.3 Payment for Delays. [Replace paragraph with the following:] To be compensable, an excusable delay must be one for which the CITY is responsible, where the delay was unreasonable under the circumstances involved, and where the delay was not within the contemplation of the parties; however, Contractor shall not be entitled to monetary compensation when (a) Contractor could have reasonably anticipated the delay and avoided or minimized the cost impacts of it, such as judicious handling of forces, equipment, or plant, (b) there was a concurrent delay which does not qualify for monetary compensation under this paragraph, (c) the cause of the delay was reasonably unforeseen by the CITY or the delay was caused by factors beyond the control of the CITY, including but not limited to a delay under Section 2.2.8 above or a delay caused by a utility company’s failure to perform despite CITY’s reasonable arrangements for such performance; or (d) any other defense available to CITY
1774061.2 SP-22 LH 6909-01/2023
under law or equity applies. Contractor has the burden of proving that any delay was excusable and compensable, including an analysis that establishes non-concurrency.
The Contractor may not seek damages for delay of a planned Completion of the Work before the contractual deadline for Completion of the Work.
6-9 LIQUIDATED DAMAGES. [Add the following to this section]:
It is agreed by the parties to the Contract that time is of the essence and that in the case that all the work is not complete before or upon the expiration of the time limit set forth, damage will be sustained by the City. For each consecutive calendar day in excess of the time specified for the completion of the work, the Contractor shall pay to the City $2,500.00. In addition, the City shall have the right to charge to the Contractor and to deduct from payments for the work the actual cost to the City of engineering, inspection, superintendence, and other overhead expenses, which are directly chargeable to the Contract and which accrue during the period of such delay. The expenses and damages described above shall be deducted from any money due the Contractor under this contract. The Contractor and his sureties shall be liable for any excess cost. 6-9.1 Additional Liquidated Damages. [Add the following section]:
Additional liquidated damages will also be assessed in the amount of $500.00 per calendar day for failure to follow a construction schedule or timely submit periodic progress reports as described in Section 6 of these Special Provisions.
Additional liquidated damages will also be assessed in the amount of $500.00 per calendar day for failure to mobilize to the Project site within 10 working days of the date of the Notice of Proceed as specified in these Special Provisions.
Additional liquidated damages shall be assessed in the amount of $1,000.00 per day for failure to restore damaged utilities within three (3) working days as specified in Section 5 of these Special Provisions.
Additional liquidated damages shall be assessed in the amount of $1,000.00 per day for failure to stripe any portion of street after slurry seal operations / asphalt overlay operations within the time limits specified in Section 314 of these Special Provisions.
Additional liquidated damages shall be assessed in the amount of $1,000.00 per day for failure to place concrete sidewalk and/or curb ramps after demolition of said concrete within the time limits specified in Section 303-5.1.1 of these Special Provisions.
Additional liquidated damages shall be assessed in the amount of $500.00 per incident that the Contractor reduces the traveled way width beyond the hours specified in Section 7-10 of these Special Provisions without written authorization from the City.
Additional liquidated damages shall be assessed in the amount of $500.00 per day for failure to comply with, or implement, or maintain the Storm Water Pollution Protection Plan (SWPPP) or Water Pollution Control Plan (WPCP), as required, by the City’s NPDES permit with the Santa Ana or San Diego Regional Water Quality Board.
Additional liquidated damages shall be assessed in the amount of $500.00 per incident that the Contractor fails to install the Best Management Practices (BMP's) within 24 hours of notification as described in Section 7-8.6.2 of the Special Provisions.
1774061.2 SP-23 LH 6909-01/2023
SECTION 7 - MEASUREMENT AND PAYMENT
7-3 PAYMENT.
7-3.2 Partial and Final Payment. [Add the following to this section]:
The closure date for periodic progress payments will be five (5) working days prior to the first Monday of each month. The final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as-constructed conditions. The City shall withhold from the final payment $15,000 in the event that the Contractor fails to return the control set of Plans and Specifications showing the as-constructed conditions.
SUBSTITUTION OF SECURITIES
In conformance with Public Contract Code Section 22300, the Contractor may substitute securities for any monies withheld by the City to ensure performance under the Contract Agreement.
At the request and expense of the Contractor, the Contractor has the option to deposit securities, which have been approved by the City, and deposited with a State or Federally chartered bank as the escrow agent. Said securities will be used as a substitute for retention earnings required to be withheld by the City, pursuant to the construction contract. The Contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive interest thereon. Said securities shall have no obligation to any other construction contract for substitution of securities in lieu of retention. When the Contractor deposits the City approved securities with the escrow agent, the escrow agent shall notify the City within 10 calendar days of the deposit.
Said securities shall be evaluated quarterly by the escrow agent to verify the current market value.
If the current market value of said securities falls below the required amount, the escrow agent shall notify the Contractor and require additional securities and/or cash to be submitted for City approval, and be held in the escrow account to meet the Contractor's obligations. Said securities shall be held by the escrow agent until such time as the escrow agent receives written notification from the City that the Contractor has satisfactorily completed his contract obligations.
Alternatively, the Contractor may request and the City shall make payment of retention earned directly to the escrow agent at the expense of the Contractor. The Contractor may direct the investment of the payment into securities and the Contractor shall receive the interest earned on the investments upon the same terms provided for securities deposited by the Contractor.
The type of securities deposited and the method of release shall be approved by the City Attorney's office.
The full five percent (5%) retention will be deducted from all payments. The City shall hold retainage from the Contractor and shall make prompt and regular incremental acceptances of portions, as determined by the City, of the Contract work, and pay retainage to the Contractor based on these acceptances. The Contractor, or subcontractor, shall return all monies withheld in retention from a subcontractor within 30 days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the Contract work by the City. Federal law (49 CFR Section 26.29) requires that any delay or postponement of payment over 30 days may take place only for good cause and with the City’s prior written approval. Any violation of this provision shall subject the violating Contractor or subcontractor to the penalties, sanctions and other remedies specified in Section 7108.5 of the Business and Professions Code.
These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or subcontractor in the event of a dispute
1774061.2 SP-24 LH 6909-01/2023
involving late payment or nonpayment by the Contractor, deficient subcontract performance, or noncompliance by a subcontractor.
The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion. . The City may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the City.
7-3.3 Delivered Materials. [Add the following to this section]:
Materials and equipment delivered but not incorporated into the work shall not be included in the estimate for progress payment.
7-3.4 Mobilization. [Add the following to this section]:
Mobilization shall consist of preparatory work and operations, including but not limited to those necessary for the movement of personnel, equipment, supplies, and incidentals to the Project site; for the establishment of all offices, buildings and other facilities necessary for the work on this Project; and for all other work and operations which must be performed or cost incurred prior to beginning work on the various contract items on the Project site. Mobilization is deemed to include all aspects of mobilization and de-mobilization work occurring during the life of the Project for any reason.
Full compensation for mobilization shall be included in the Contract LUMP SUM price bid for Mobilization and shall include full compensation for all costs incurred by the Contractor for doing all the work involved in mobilization as specified herein, and no additional compensation will be allowed. Mobilization shall not exceed 5% of the entire bid, excluding mobilization and as shown in the Proposal Bid Sheet.
7-3.5 Contract Unit Prices
7-3.5.1 General. [Replace with the following]:
If a change is ordered in an item of work covered by a Contract Unit Price, and such change does not involve substantial change in character of the work from that shown on the Plans or specified in the Specifications, then no adjustment in payment will be made regardless of the quantity of work performed.
If a change is ordered in an item of work covered by a Contract Unit Price, and such change does involve a substantial change in the character of the work from that shown on the Plans or specified in the Specifications, an adjustment in payment will be made per 7-3.7. 7-3.5.2 [Delete entire section]
7-3.5.3 [Delete entire Section]
7-3.7 Agreed Prices. [Replace with the following]:
Agreed Prices are prices for new or unforeseen work established by mutual agreement between the Contractor and the Agency. If mutual agreement cannot be reached, the Engineer may direct the Contractor to proceed on the basis of Extra Work in accordance with Section 7-4. 7-4 PAYMENT FOR EXTRA WORK.
1774061.2 SP-25 LH 6909-01/2023
7-4.2 Basis for Establishing Costs.
7-4.2.1 Labor [Amend as follows]:
Delete “Workers Compensation Insurance and Liability Insurance” from the “employer payments” in the first paragraph.
7-4.3 Markup.
7-4.3.1 Work by the Contractor. [Replace with the following]:
The following percentages shall be the maximum added to the Contractor’s costs and shall constitute the markup for all overhead, profits, Workers Compensation Insurance & Liability Insurance;
1) Labor 20
2) Materials 15
3) Equipment Rental 15
4) Other Items and Expenditures 15
To the sum of the Costs and markups provided for this subsection, one percent shall be added as compensation for bonding. In any event, notwithstanding the above markups, the total labor mark-up shall not exceed 33% of the base labor hourly pay rate. No additional compensation shall be allowed.
7-4.3.2 Work by a Subcontractor. [Replace with the following]:
When all or any part of the extra work is performed by a Subcontractor, the markup established in 7-4.3.1 shall be applied to the Subcontractor’s actual cost of work. A markup of ten percent (10%) on the first $5,000 of the subcontracted portion of the extra work and a markup of five percent (5%) on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
The markups mentioned hereinafter shall include, but are not limited to, all costs for all forms of insurance and the services of superintendents, project managers, timekeepers and other personnel not working directly on the change order and pickup or yard trucks used by the above personnel. These costs shall be reported as labor or equipment elsewhere except when actually performing work directly on the change order and then shall only be reported at the labor classification of the work performed.
SECTION 9 – FACILITIES FOR CONTRACT PERSONNEL. [Add this section]:
9-1 EXTENDED FIELD OFFICE OVERHEAD COST.
Within fourteen (14) calendar days after receipt of the Notice to Proceed, the Contractor shall submit written statement to the City detailing its field office overhead costs which are time related.
The City will review this first cost submittal and reach a written agreement with the Contractor on a daily field office overhead cost rate which shall be memorialized in a no cost change order. The daily rate agreed to in this change order will be applicable throughout the duration of the Contract.
No field office costs will be paid until such an agreement is reached between the City and the Contractor and the change order concerning this daily rate is executed by both parties. Progress
1774061.2 SP-26 LH 6909-01/2023
payments will be withheld pending receipt of the above-referenced cost submittal and executed change order.
The individual cost components of the daily field office overhead rate shall represent costs which increase as a direct result of any time extension caused solely and exclusively by an act or omission of the City. This listing may include such cost items as on-site project management, supervision, Engineering and clerical salaries; on-site utilities and rent; on-site company vehicles and their operating expenses; and site maintenance and security expenses. Field office overhead costs which are unaffected by increased time shall not be allowable cost in calculating the daily field office overhead rate. These non-time related costs include, but are not limited to, acquisition and installation of stationary equipment; temporary construction facilities; utilities and office furnishings (unless such items are rented or leased); the preparation of the site including clearing, grubbing, grading, fencing, mobilizations and demobilization costs; and the costs of permits, bonds and insurance coverage for the Project.
The individual wage cost components used to calculate the daily field office rate shall be supported by actual employee payroll records, not salary ranges or estimates. Hourly rates for management, supervisory, engineering, and clerical employees shall be based upon 2080 work hours per year and shall not include allowances for holidays, vacations, or sick time.
When applicable, the daily field office overhead rate shall be multiplied by the number of days the Contract is delayed or extended by change order and shall be added to the agreed upon change order cost. The days of delay shall be those caused solely by the acts or omissions of the City and documented by a time impact analysis prepared and submitted by the Contractor. In the event a deductive change order is issued which reduces time under the Contract, the daily field office overhead rate shall be used to calculate the deductive amount. No allowance for overhead costs and no profit allowance shall be added to the extended field office overhead cost.
SECTION 10 - RESPONSIBILITIES OF THE CONTRACTOR [Add this section]:
10-1 CONTRACTOR'S EQUIPMENT AND FACILITIES.
10-1.1 General.
Conduct of the Work. The Contractor shall behave, at all times, in a courteous, professional manner. While on site, or entering or exiting the site, there shall be no extraneous activity that might cause disruption to the Project site, surrounding areas, or residents. Failure to comply may result in the suspension of work, or removal of contractor’s staff from the Project.
Noise Levels. A noise level limit of 86 dbA at a distance of fifty feet (50') shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases required for the protection of personnel.
10-2 COOPERATION AND COLLATERAL WORK.
The Contractor is advised as to the possibility of other construction projects within the proposed construction zone by the City, other governing agencies or private enterprises. In the event of such projects, the Contractor shall coordinate with the applicable parties as to the extent of any time required to complete their work and shall schedule its work and conduct its operations so as to permit access and time as required for the concurrent work. The Contractor shall immediately notify the City Engineer in the event of a delay in scheduling caused solely by this concurrent
1774061.2 SP-27 LH 6909-01/2023
work. Payment for the above, if any, shall be deemed as included in the items of work as shown on the proposal bid sheet and no additional compensation will be allowed. 10-3 PROJECT SITE MAINTENANCE.
10-3.1 Cleanup and Dust Control.
The Contractor shall keep adjacent properties clean and free of rubbish and debris in a timely manner as necessary and/or as directed by the Engineer.
The Contractor shall implement effective handling, storage, usage, and disposal practices to control material pollution and manage waste and nonstormwater at the job site before they come in contact with storm drain systems and receiving waters. 10-3.1.1 Construction Cleaning [Add the following section]:
The Contractor shall:
(a) Initiate and maintain a daily program to prevent accumulation of debris on-site and along access roads and haul routes. Maintain areas under Contractor's control free of waste materials, debris, weeds 6” high, and rubbish. Maintain site in a clean and orderly condition. (b) Provide suitable covered containers for deposit of debris and rubbish. Dispose of accumulation of extraneous materials, prohibit overloading of trucks to prevent spillages on access and haul routes and provide daily inspection of haul routes to enforce requirements. (c) The Contractor shall supply self-loading motorized street sweepers equipped with a functional water spray system as part of his daily program. (d) Schedule at a minimum, weekly collection and disposal of debris. Provide additional collections and disposals of debris whenever the weekly schedule is inadequate to prevent accumulation.
The Contractor shall remove debris from closed or remote spaces prior to closing the space, control cleaning operations to minimize dust and other particulates and immediately remove clay and earth which adhere to the paved surface of the roadway. Remove by hand scraping, washing, sweeping, and/or other method(s) which will leave a clean non-skid surface without impairing, injuring or loosening the surface.
The Contractor is required to control dust throughout the life of the Contract. The control may be required by job conditions or City Engineer. In any case, the Contractor shall use water or other means to control the dust. No chemical agents may be used without written authorization from the Agency. The Contractor shall be solely responsible for safety problems, accidents or any other complications or claims arising from inadequate dust control.
No separate payment will be made for any work performed or material used to control dust resulting from the Contractor's performance of the work, or by public traffic, either inside or outside the right-of-way. Full compensation for such dust control will be considered as included in the price paid for the various items of work involved.
No separate payment will be made for any work performed or material used in cleaning the Project. Full compensation for such cleaning shall be considered as included in the price paid for the various items of work involved and no additional compensation will be allowed therefore.
1774061.2 SP-28 LH 6909-01/2023
10-4 WATER POLLUTION CONTROL
10-4.1 Best Management Practices (BMPs)
Per the Federal Clean Water Act, the Contractor is required to eliminate pollution to waters of the United States in regards to this Project. This Project will require the Contractor to implement “Best Management Practices”.
The Contractor shall submit a Water Pollution Control Plan (WPCP) as detailed in Appendix A.
The Contractor shall confirm that all of the Best Management Practices (BMP’s) have been adequately detailed that addresses his or her anticipated construction operations and meets the intent of the NPDES requirements. After the Notice of Award, the Contractor shall submit to the City a finalized and signed WPCP, which establishes the construction BMP requirements, for review and approval. No work will be allowed to begin without an approved WPCP on file with the City.
The Contractor shall utilize Best Management Practices (BMP’s) outlined in the WPCP during construction to ensure that sediment from storm runoff and construction activities does not enter storm drains. Some of the primary Water Pollution Control measures anticipated for this Project include, but are not limited to, covering all storm drain inlets in the Project vicinity with water permeable fabric and gravel bags prior to performing any adjacent AC grinding, removal or paving operations or PCC ramp lip grinding; properly fueling and cleaning all equipment/vehicles; maintaining an ample supply of gravel/sand bags on-hand when excavating new PCC sidewalk/ramp/curb/gutter improvements in the event of rain; properly containing all PCC treatment materials such as the coloring agents, exposed aggregate etching chemicals and surface treatment chemicals required to install the detectable warning mats; properly covering all incoming material trucks and all out going debris hauling vehicles; providing restroom facilities for workers; and regular street sweeping of the work area and haul routes to the satisfaction of the Owner’s Representative.
The requirements of all of the following agencies shall be met and maintained and where there is a conflict between requirements, the most stringent requirement shall govern.
1. San Diego Regional Water Quality Control Board
2. Santa Ana Regional Water Quality Control Board
3. County of Orange
10-4.1.2 Payment
Full compensation for conforming to Subsection 7-8.6, including providing all necessary Best Management Practices shall be considered as included in the Contract LUMP SUM price for Water Pollution Control Plan and BMP Implementation and shall include finalizing and implementing the WPCP in accordance with the “Draft” WPCP and as detailed herein, and shall include full compensation for encroachment permit processing as related to the WPCP, furnishing all labor, tools, materials, and incidentals for implementing said approved / finalized WPCP. 10-5.1 Payment.
The Contract LUMP SUM price bid for the Traffic Control & Noticing bid item shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the traffic control related work involving placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of traffic control system as specified in the
1774061.2 SP-29 LH 6909-01/2023
Standard Specifications and these specifications and as directed by the City. The lump sum price shall also include steel plates and temporary AC including installation and removal; all associated temporary signing and striping; flashing arrow signs; flagging and/or flagmen costs; night work; Project notifications; and changeable message signs at the Project site, and no additional compensation will be made therefore.
10-6 CONTRACTORS RESPONSIBILITIES FOR WORK
Until Acceptance of the Work, the Contractor shall have the responsibility, charge and care of the Work and of the materials to be used therein (including materials for which it has received partial payment or materials which have been furnished by the City) and shall bear the risk of injury, loss or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the Work.
The Contractor shall rebuild, repair, restore, and make good all injuries, losses, or damages to any portion of the work or the material occasioned by any cause before its completion and acceptance and shall bear the expense thereof. Where necessary to protect the work or materials from damage, the Contractor shall at his expense provide suitable drainage and erect such temporary structures as are necessary to protect the work or materials from damage. The suspension of the work from any cause whatever shall not relieve the Contractor of his responsibility for the work and materials as herein specified. If ordered by the City Engineer, the Contractor shall at his expense properly store materials which have been partially paid for by the City or which have been furnished by the City.
Such storage by the Contractor shall be on behalf of the City, the City shall at all times be entitled to the possession of such materials, and the Contractor shall promptly return the same to the site of the work when requested. The Contractor shall not dispose of any of the materials so stored, except on written authorization from the City.
In an emergency affecting the safety of life or property, including adjoining property, the Contractor, without special instructions or authorizations, is authorized to act at his discretion to prevent such threatened loss or injury, and he shall so act as though instructed to do so by the City.
1774061.2 SP-30 LH 6909-01/2023
PART 2 - CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIALS
200-1 ROCK PRODUCTS.
200-1.1 General. [Add the following to this section]:
Coarse aggregate is material retained on the No. 4 (4.75 mm) sieve and fine aggregate is material passing the No. 4 (4.75 mm) sieve.
Materials may be sampled at any time until final formal acceptable of the Work. 200-1.1.3 Source. [Add the following section]:
Before beginning Portland cement concrete, asphalt concrete, and slurry seal work, the Contractor shall submit the name of the supplier to the Engineer as specified in 3-8. The supplier shall have on file with the Agency mix designs for Portland cement concrete conforming to 201-
1.1, asphalt concrete conforming to 203-6.2, and slurry seal conforming to 203-5.4.2, when required by Specifications.
200-1.1.2 Statistical Testing. [Add the following to this section]:
Whenever the results of an individual test for any property of a material, other than concrete compressive strength, does not comply with the limits specified for the moving average should the next test be of the same value as that of the test being considered, the production of that material shall be suspended until corrective changes have been made by the Contractor and test indicate that the quality of the next material to be used in the work complies with that specified moving average.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1 Requirements.
201-1.1.1 General. [Add the following to this section]:
The same brand, type and source of cement and aggregate shall be used for all Portland Cement Concrete. All concrete used on the Project shall be 560-C-3250. Type II/V cement shall be used. 201-1.2 Materials.
201-1.2.1 Cement. [Add the following]:
Portland cement shall be Type II/V.
201-1.2.5.3 Fly Ash. [Delete this Section and Add the following]:
Fly ash shall not be used.
201-2 REINFORCEMENT FOR CONCRETE.
1774061.2 SP-31 LH 6909-01/2023
201-2.2 Steel Reinforcement. [Add the following]:
All reinforcing steel shall be Grade 60 unless otherwise shown on Plans.
SECTION 203 - BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE.
203-6.1 General. [Add the following to the end of the subsection:] Asphalt concrete mixes shall comply with Orange County Public Works Standard Plan 1805 requirements, subject to the following clarifications:
Surface Course AC: ½” Type IIIC3 PG 64-10 R20
Base Course AC: ¾” Type IIIB2 PG 64-10 R20
Leveling Course AC and Miscellaneous AC Placement (Hand patching): 3/8” Class D2 PG 64-10 R20
Sampling and Testing
The City Engineer shall have the right to obtain samples of all materials to be used in the work at any stage of the production and construction process and to test such samples for the purpose of determining specification compliance.
Materials that failed the tests shall be replaced by the Contractor, and retesting for specifications compliance shall be at the Contractor's expense
SECTION 211 - MATERIAL TESTS
Proposed off-site fill material shall be inspected, tested and laboratory report issued prior to use in the work. Suitable excavated materials removed to accommodate new construction may be used as fill material subject to Soils Engineer's inspection and approval. 211-1.2 Field Density. [Add the following to this section]:
Field density tests will be made by the Engineer during the course of construction at the expense of the CITY. If field density tests indicate that any portion of the compacted sub-grade has density or moisture level lower than that specified, the Contractor shall rework that portion until the specified density and moisture level is obtained. Retest of areas, which have failed compaction, will be performed by the Engineer at the Contractor's expense.
SECTION 214 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS [Replace the entire Section with the following]:
214-1 GENERAL.
Traffic stripes and pavement markings shall conform to the State Standard Specifications as described in these specifications.
1774061.2 SP-32 LH 6909-01/2023
PART 3 - CONSTRUCTION METHODS
SECTION 300 EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1 General. [Add the following to this section]:
In addition to the work outlined in Subsection 300-1 of the Standard Specifications, the following items of work are included under Clearing and Grubbing unless otherwise covered by a specific bid item.
1. Mobilization work and operations per Subsection 7-3.4.
2. Documentation of existing conditions per Subsection 300-1.2 of these specifications.
3. Hand removal and disposal of all vegetation, trees, tree roots, trash and other objectionable material from the affected portion of the project and areas adjoining thereto.
4. Maintain dust control at all times by sweeping; including developing a water supply and furnishing and placing all water required for work done in the contract, including water used for extra work and water used for irrigation purposes.
5. Protection of utilities, trees, shrubs, fences, walls, and other facilities within the construction zone, except those specifically directed by the Engineer to be removed or relocated.
6. Daily cleanup work site including streets, sidewalks and driveways. Daily litter removal.
Daily and as needed street sweeping as specified herein. Recycling of waste materials and provisions for refuse containers from CR&R.
7. Clearing and removal of debris from site of work.
8. Removal of structures, as directed by Engineer to be removed or abandoned.
9. Delay in work necessary to accommodate utility relocations by others.
10. Other items of work as directed in these specifications. 300-1.1.1 Preservation of Property. [Add the following section]:
Prior to start of demolition, the Contractor shall document existing conditions adjoining Project limits to establish preconstruction conditions that might be misconstrued as damage caused by site clearing. Contractor shall use sufficiently detailed photographs and videotape to document existing conditions of any damage. Contractor shall provide photographs and videotape to the Engineer upon request. Payment for this work shall be included in all other items of work and no additional compensation will be allowed.
300-1.2.1 Removal and Disposal of Materials. [Add the following section]:
All materials removed, except for materials indicated to be relocated or salvaged, become the property of the Contractor and shall be hauled to and lawfully disposed of at a site secured by the Contractor. The Contractor will provide the Engineer with a letter indicating the final disposition of materials hauled away and disposed offsite from the Project within five (5) working days after Project completion. No removed materials shall be left within the Project limits overnight.
Any existing irrigation system interfering with construction of new improvements shall be removed and relocated. Payment for removal and relocation of interfering existing irrigation system will be
1774061.2 SP-33 LH 6909-01/2023
considered as included in the item of work interfering with the existing irrigation system and no additional compensation will be allowed.
Any curb drain or parkway drain within limits of removal shall be removed and replaced in kind.
Payment for removal and reconstruction or curb drain and parkway drain will be considered as included in the item of work removing the adjacent curb or sidewalk and no additional compensation will be allowed.
Prior to the removal of materials, the Contractor shall coordinate with the regional notification center (Underground Service Alert of Southern California) to mark out all existing utilities per Section 402. Contractor shall confirm location and depth of all existing utilities per Section 402 in order to avoid damage to them during removal operations. 300-1.1.3 Bituminous Pavement. [Add the following section]:
Prior to removal of bituminous pavement, saw cutting, excavation, or cold milling, the Contractor shall scan the work area using a metal detector of adequate strength to located manholes, valves, utility access covers or any other metal appurtenances buried below the existing pavement surface whether shown on the Plans or not. Contractor shall be responsible for locating these utilities, and if any are found that aren’t shown on the Plans, Contractor shall inform the Engineer for direction on disposition of utility.
Unless specified on Plans to be cold milled, all bituminous pavement shall be saw cut to full depth in a straight line with a power driven saw and completely removed. Where only the surface of existing bituminous pavement is to be removed, the method of removal shall be cold milling per Section 404 and a minimum laying depth of two (2) inches of new pavement material shall be provided at the join line.
300-1.1.4 Payment. [Add the following to this section]:
Compensation for Clearing and Grubbing shall be included in all other items of work and no additional compensation will be allowed.
300-1.2 Root Pruning and Tree Trimming. [Add the following]:
303-1.2.1 Root Pruning.
1. Cut tree roots along both side of walk area, and behind existing edges to a minimum of 20-inches deep.
2. Tree roots will not be cut up to the base of the trunk.
3. All tree root cutting will be approved by the City’s representative.
Root pruning equipment shall be specifically designed for this purpose, sharpened adequately to sever roots in a clean manner, and equipped with padded tracks or rubber tires to prevent scraping or marking of sidewalks.
All cuts shall be backfilled whether immediately upon completion of root pruning or upon completion of sidewalk and curb and gutter repairs and root barrier installation provided that adequate warning devices are placed and maintained at each location. Backfill material shall consist of dirt, Crushed Aggregate Base or crushed miscellaneous base.
1774061.2 SP-34 LH 6909-01/2023
The Contractor shall repair or replace sprinkler system and all utility service connections within the right-of-way which are damaged or removed as a result of the root pruning operation. Repairs shall be initiated immediately and completed by the end of each working day. Repairs and replacements shall be at least equal to existing improvements, and shall match them in finish and dimension, and will be done at Contractor’s expense.
300-1.3.1 General. [Add to this section:]
The work shall be done in accordance with Section 300-1.3.2 of the Standard Specifications except as modified and supplemented herein. Joins to existing pavement lines shall be full depth sawcuts. Final removal between the sawcut lines may be accomplished by the use of jackhammers or sledgehammers. Pavement breakers or stompers will not be permitted on the job. The Engineer must approve final removal accomplished by other means.
The Contractor shall maintain the job site in a clean and safe condition. The Contractor will remove any broken concrete, debris or other deleterious material from the job site at the end of each workday. All areas of roadway removal and replacement shall have a minimum trench width of 3-feet to facilitate maximum compaction. Contractor shall meet with the Engineer to mark out the areas of roadway removal and replacement.”
300-1.3.2 Requirements. [Add the following]:
(a) Bituminous Pavement. It shall be the Contractor’s responsibility to dispose of all suitable bituminous pavement at a recycling facility. The expense for such work shall be deemed as included in the unit price for various items of work in the contract. No additional compensation will be allowed.
(c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveways, and Alley Intersections.
Replace the first sentence of this Section with: “Saw cuts shall be neatly made to a minimum of two (2) inches.” Replace the words “1-½ inch” of the last sentence with the words “two (2) inches”. (d) Miscellaneous
In addition to the work outlined in Subsection 300-1 of the Standard Specifications, the following items listed below will not be paid separately. The expenses for such work shall be deemed as included in the price bid for various bid items and no additional compensation will be allowed.
1. Tree removal and relocation, as required.
2. Removal of interfering portions of fences, planters, sign foundations, vegetation and irrigation systems.
3. Maintain dust control at all times by watering.
4. Protection of utilities, trees, fences, walls signs and other facilities within the construction zone, except those directed to be removed or relocated.
5. Relocation of existing parking bumpers, flag poles, posts, guard posts, curb drains, mailboxes and private property lighting systems not covered under other items of work.
1774061.2 SP-35 LH 6909-01/2023
6. Removal and salvaging of existing signs.
7. Removal and salvaging of existing bus shelters, street furniture and other appurtenances.
8. Removal of existing A.C. berm.
9. Removal of existing parkway drainage improvements such as curb drains, parkway culverts, etc.
10. All sawcutting of existing A.C. pavement and concrete pavement surfaces necessary to facilitate construction of the project.
11. Notifying owners of all newspaper machines and vending machines to remove their facilities from street. Contractor shall remove and dispose of said facilities if no action is taken by Owner.
12. Removal of any other items within the work zone which are not accounted for under individual items of work in these specifications.
300-1.4 Payment. [Add the following]:
Unless otherwise specified, compensation for clearing and grubbing shall be included in the Remove & Replace Existing Curb Ramp bid item and no additional compensation will be allowed. Payment shall include full compensation furnishing all labor, materials, tools, equipment and doing all work involved in clearing and grubbing as specified. 300-1.5 Solid Waste Diversion. [Add section.]
Non reinforced concrete and asphalt wastes generated from the job site shall be disposed of at a facility that crushes such materials for reuse. Excess soil and other recyclable solid wastes shall not be disposed of at a sanitary landfill.
The Contractor shall maintain monthly tonnage records of total solid wastes generated and solid wastes disposed of at a sanitary landfill. The Contractor shall report said tonnage monthly to the Engineer on a form provided by the Engineer and provide appropriate confirmation documentation from the recycling facility.
300-2 UNCLASSIFIED EXCAVATION.
300-2.1 General. [Add the following to this section]:
Unclassified Excavation shall consist of all saw cutting and excavation of existing roadway as necessary to construct the proposed AC “dig-out” improvements as directed by the Engineer.
Removals in AC pavement shall be minimum 3 inch depth and in PC concrete minimum 3 inch depth, or as directed by the Engineer.
Removal shall be done in accordance with Section 300-1 and Section 401 of the Standard Specifications and these Special Provisions.