EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
30. Indemnification
Subrecipient, at its sole cost and expense, shall indemnify, defend, and hold the Department and its employees, appointees, representatives, attorneys, agents, and their respective successors, heirs, and assigns harmless from and against any and all claims, demands, actions, costs, losses, damages, and liabilities, whether direct or indirect, and regardless of their nature or source, which in any way relate to or arise from the actions or inactions of Subrecipient and/or its contractors, subcontractors, employees, owners, agents, and representatives in connection with this Agreement and any agreement or instruments executed in connection herewith. The obligations of Subrecipient under this Section shall survive indefinitely the closeout of Approved Activity and the expiration or earlier termination of this Agreement.
31. Anti-Lobbying Certification
The Subrecipient shall require that the language of this certification be included in all contracts or subcontracts entered into in connection with the Approved Activity(ies) and shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into.
Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and no more than $100,000 for such failure.
A. No federal appropriated funds have been paid or will be paid, by or on behalf of it, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
B. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, it will complete and submit Standard Form LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
City of Lakeport
18-MITRIP-23008
EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
32. Conflict of Interest
Pursuant to 24 CFR 570.489(h), no member, officer, or employee of the Subrecipient, or its designees or agents, no member of the governing body of the locality in which the Approved Activity is situated, and no other public official of such locality or localities who exercise or have exercised any functions or responsibilities with respect to MIT-RIP activities assisted under this part, or who are in a position to participate in a decision making process or gain inside information with regard to such activities, including members and delegates to the Congress of the United States, may obtain a financial interest or benefit from a MIT-RIP assisted activity, or have a financial interest in any contract, subcontract or agreement with respect to a MIT-RIP assisted activity or its proceeds, either for themselves or those with whom they have business or immediate family ties, during their tenure, or for 1 year thereafter. The Subrecipient shall incorporate, or cause to be incorporated, in all such contracts or subcontracts a provision prohibiting such interest pursuant to the purposes of this section.
33. Obligations of Subrecipient with Respect to Certain Third-Party Relationships
The Subrecipient shall remain fully obligated under the provisions of this Agreement notwithstanding its designation of any third party or parties for the undertaking of all or any part of the Work with respect to which assistance is being provided under this Agreement to the Subrecipient. The Subrecipient shall comply with all lawful requirements of the Department necessary to ensure that the Work, with respect to which assistance is being provided under this Agreement to the Subrecipient, is carried out in accordance with the Department's Assurance and Certifications, including those with respect to the assumption of environmental responsibilities of the Department under Section 104(g) of the Housing and Community Development Act of 1974 (42 U.S.C. § 5304(g)).
34. Energy Policy and Conservation Act
This Agreement is subject to mandatory standards and policies relating to energy efficiency which are contained in the State Energy Conservation Plan issued in compliance with the federal Energy Policy and Conservation Act (Pub. L. 94163, 89 Stat. 871).
35. State Contract Manual Requirements (Section 3.11, Federally Funded Contracts (Rev. 3/03):
City of Lakeport
18-MITRIP-23008
EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
A. All contracts, except for State construction projects that are funded in whole or in part by the Federal government, must contain a 30-day cancellation clause and the following provisions:
1) It is mutually understood between the parties that this contract may have been written for the mutual benefit of both parties before ascertaining the availability of congressional appropriation of funds to avoid program and fiscal delays that would occur if the contract were executed after that determination was made.
2) This contract is valid and enforceable only if sufficient funds are made available to the State by the United States Government for the purpose of this Program. In addition, this contract is subject to any additional restrictions, limitations, or conditions enacted by the Congress or to any statute enacted by the Congress that may affect the provisions, terms, or funding of this contract in any manner. 3) The parties mutually agree that if the Congress does not appropriate sufficient funds for the Program, this contract shall be amended to reflect any reduction in funds.
4) The Department has the option to invalidate the contract under the 30-day cancellation clause or to amend the contract to reflect any reduction in funds.
B. Exemptions from provisions A.1 through A.4 above may be granted by the Department of Finance provided that the director of the State agency can certify in writing that Federal funds are available for the term of the contract.
C. Gov. Code § 8546.4(e) provides that State agencies receiving Federal funds shall be primarily responsible for arranging for Federally required financial and compliance audits, and shall immediately notify the Director of Finance, the State Auditor, and the State Controller when they are required to obtain Federally required financial and compliance audits.
36. Fraud, Waste, and Abuse
A. False, Fictitious or Fraudulent Claims - Warning: Any person who knowingly makes a false claim or statement to HUD or the Department may be subject to civil or criminal penalties under 18 U.S.C. §287, 1001 and 31 U.S.C. §3729.
B. Detecting, Preventing, and Reporting Fraud - Fraud is a white-collar crime that has a devastating effect on the CDBG-DR program because the City of Lakeport
18-MITRIP-23008
EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
CDBG-DR program beneficiaries are victims of this crime when the CDBG-DR program is abused. The Department wants to stop any criminal assault on the CDBG-DR program it administers, and in doing so ensure all CDBG-DR funds go to people it was designed to help and improve their living conditions.
C. Combatting Fraud - The HUD Office of Inspector General (OIG) is committed to protecting HUD’s programs, operations, and beneficiaries from dishonest individuals and organizations. HUD cannot combat fraud alone; they rely on Department and DR Workforce Development NOFA Applicants to combat CDB-DR program fraud. HUD also relies on Applicants for and people receiving HUD benefits, such as: tenants receiving rental assistance, borrowers with HUD insured loans, or citizens having their communities restored using HUD grants. The HUD OIG Hotline number is 1-800-347-3735. This is the primary means to submit allegations of fraud, waste, abuse, mismanagement, or Whistleblower related matters for the CDBG-DR program to the OIG.
HUD OIG accepts reports of fraud, waste, abuse, or
mismanagement in the CDBG-DR program from HUD employees, anyone administering the CDGB-DR program, anyone working in the CDBG-DR program, contractors, and the public.
You can report mismanagement or violations of law, rules, or regulations by HUD employees or program participants. Fraud, Waste and Abuse in the CDBG-DR program and its operation may be reported in one of the following four (4) ways:
1) By email to: [email protected]
2) By phone: Call toll free: 1-800-347-3735
3) By fax: 202-708-4829
4) By mail: Department of Housing & Urban Development
Office of Inspector General Hotline Manager
400 Virginia Avenue, SW, Suite 120
Washington, DC 20024
37. Whistleblower Protections
A. Federal Whistleblower Protection Act (5 U.S.C Section 2302(b)(8)) The Federal Whistleblower Protection Act (WPA) protects employees from retaliation for making protected disclosures. The WPA also provides penalties for supervisors who retaliate against Whistleblowers.
City of Lakeport
18-MITRIP-23008
EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
1) A disclosure is protected under the WPA if the employee discloses information the employee reasonably believes to be evidence of:
a) a violation of any law, rule, or regulation,
b) gross mismanagement,
c) a gross waste of funds,
d) an abuse of authority, or
e) a substantial and specific danger to public health or safety. 2) In general, an employee or applicant may make a protected disclosure to anyone, including non-governmental audiences, unless the information is classified or specifically prohibited by law from release. Options for making a protected disclosure include:
a) Informing a supervisor or someone higher up in
management,
b) Submitting a complaint to the OIG by emailing the OIG at [email protected],
c) Filing a complaint with the Office of Special Counsel (OSC) http://www.osc.gov/
B. The California Whistleblower Protection Act (Title 2, Division 1, Chapter
6.5, Article 3.5, Gov. Code §§ 8548-8548.5)
1) The California Whistleblower Protection Act authorizes the California State Auditor to receive complaints from state employees and members of the public who wish to report an improper governmental activity. An "improper governmental activity" is any action by a state agency or any action by a state employee directly related to state government that:
a) Violates any state or federal law or regulation,
b) Violates an Executive Order of the Governor, a California Rule of Court, or any policy or procedure required by the State Administrative Manual or State Contracting Manual, or City of Lakeport
18-MITRIP-23008
EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
c) Is economically wasteful or involves gross misconduct, incompetency, or inefficiency. Complaints received by the State Auditor are confidential, and the identity of the complainant may not be revealed without the complainant's permission, aside from to an appropriate law enforcement agency conducting a criminal investigation.
2) There are many ways to file a complaint:
a) By Telephone
You may call the Whistleblower Hotline at (800) 952-5665 to file a complaint by talking to one of the State Auditor's employees. The hotline generally is staffed Monday through Friday from 8:00 a.m. to 5:00 p.m. If you call when the hotline is not being staffed, or staff is occupied with other calls, you may leave a voicemail message requesting a
return call.
b) By Mail or Facsimile
You may file a complaint in the form of a letter to the State Auditor addressed as follows:
Investigations
California State Auditor
P.O. Box 1019
Sacramento, CA 95812
Or you may fax the letter to the State Auditor at (916) 322- 2603.
As an alternative, you may complete the electronic version of the complaint form (which is available on the State Auditor website at auditor.ca.gov), print it out, and return it by mail or facsimile as stated above.
c) Online
Although the State Auditor does not accept complaints by email, you may file a complaint online at https://www.auditor.ca.gov/contactus/complaint
City of Lakeport
18-MITRIP-23008
EXHIBIT D
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/20/2024
The State Auditor will not undertake an investigation unless there is a basis for believing that your complaint has sufficient merit to warrant spending resources on an investigation. Your complaint should therefore include:
i. A clear and concise statement of what you are alleging to be improper activity and why you believe it is improper.
ii. The name or other information that clearly identifies the person you are alleging has acted improperly and the
department where that person works.
iii. The names and contact information for any witnesses who can confirm the truth of what you are saying.
iv. Copies of any documents that will support what you are saying. (You should not submit original documents, as they cannot be returned.)
38. Authority to Post Remediated Versions of Agreement
Subrecipient hereby understands and acknowledges that the Department is obligated under federal law to post on the Department’s website copies of all CDBG-DR executed contracts. As posted, such contracts must be compliant with federal and state law accessibility laws, including the California Government Code Section 11546.7 (2017 Assembly Bill 434) and the federal Americans with Disability Act, Section 508. The state law is most stringent of the two, so all posted documents must meet Web Content Accessibility Guidelines 2.0 (WCAG
2.0) accessibility level.
To comply, the Department must utilize document remediation tools that provide the compliant formatting. All remediation will only change formatting, color schemes, and update any tables so that screen readers can properly read out the content of the table. Thus, during remediation, the appearance of this Agreement may change, but under no circumstances shall any terms or tenets of the Agreement be changed in anyway.
Additionally, the Department shall offer website visitors the option to receive a scanned, un-remediated copy of this Agreement via email, which option Subrecipient also consents to.
The foregoing Subrecipient authorizations apply to both this original Standard Agreement as well as any and all subsequent amendments thereto.
City of Lakeport
18-MITRIP-23008
EXHIBIT E
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep Date: 09/20/2024
SPECIAL TERMS AND CONDITIONS
1. Due Diligence Review
Subrecipient has provided, or will provide, the Department with information about the Subrecipient’s experience, processes, policies, and procedures related to the management of federal funding by the Subrecipient. These submissions, in addition to discussions with the Subrecipient, have been used to inform this Agreement and are being materially relied upon by the Department in agreeing to enter into this Agreement.
Should there be substantive changes to the organization, key personnel, methods, capacity, policies, or processes of the Subrecipient that impact the implementation of this Agreement, the Subrecipient shall promptly notify the Department of said changes.
Subrecipient agrees to timely provide documents and information to the Department in order for the Department to facilitate its Subrecipient due diligence as required by Federal Register Notice 85 FR 4681. Subrecipient further agrees to comply with the requirements, requests, and results of the Department’s due diligence and maintain the capacity to carry out disaster recovery activities in a timely and compliant manner at all times during the term hereof.
2. Risk Assessment
During the term of this Agreement, Subrecipient agrees to timely provide documents and information to facilitate the Department’s Subrecipient risk assessment process. Subrecipient further agrees to comply with the requirements, requests, and results of the Department’s risk assessment, including participation in Subrecipient monitoring events.
3. Special Conditions
Pursuant to Exhibit A, Section 3, Subrecipient Scope of Work, and the Due Diligence and Risk Assessment as referenced above, Subrecipient agrees to adhere to the following Special Conditions: None
DETAILED SCOPE OF WORK, BUDGET, AND APPLICATION
Name of Project: Silveira Community Center ADA
Grants Network Unique Identifier (Contract Number): 18-MITRIP-23008
1. Program Overview
THE CDBG-MIT ELIGIBLE ACTIVITY(IES):
• Installation of Public Facilities and Improvements
THE NATIONAL OBJECTIVE TO BE ACHIEVED FOR EACH ACTIVITY AS A RESULT OF THIS PROJECT:
• Low and Moderate Income (LMI)
THE METHOD OF MEASURING NATIONAL OBJECTIVE, IF LMI:
• Limited Clientele (LMC)
THE NUMBER OF INDIVIDUALS BENEFITTING FOR EACH ACTIVITY AS A RESULT OF THIS PROJECT:
• Total beneficiaries: 1,748
• Total low/mod beneficiaries: 1,748
2. Activity Scope of Work (“Work”)
3. • The Silveira Community Center is an existing public facility owned and operated by the City of Lakeport. Currently the center is in need of providing ADA accessibility to serve as a Community Resiliency Center during a disaster, emergency, or weather event. To address these challenges and allow the Center to serve as a Community Resilience Center, this project will update the building all community members the ability to access the space during disaster and nondisaster times. This project will benefit the whole community and specifically the 1748 disabled adults that currently cannot fully access this community center.
4. Budget Worksheets (attached)
The Project budget is included below as Attachments 1 and 2.
Attachment 1 – Grants Network Budget Worksheet is the high level, official budget for the Project. Any adjustments of this budget will result in either a budget revision or amendment.
Exhibit F City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Attachment 2 – Total Activity Budget Worksheet is the overall, detailed project budget submitted with the application. This budget provides a breakdown of the Grants Network Budget Worksheet. Only changes to the Total Activity Budget Worksheet that impact the Grants Network Budget Worksheet will result in either a budget revision or amendment.
When applicable, documentation that supports the indirect cost rate and ADCs is included as Attachment 6.
5. Performance Measures
The following performance measures, included as Attachment 3, have been determined to be required for the monthly activity report, at the discretion of HCD and they are in bold below. Each month the Subrecipient will report on how the Project has progress on reaching the target numbers. The proposed target numbers are based on information provided by the Subrecipient and the Work Deliverable is identified per Activity performance measure. Projects are not required to report on the non-bolded items.
6. Project Schedule
The Project Schedule for the Project is included below as Attachment 4.
7. Application (attached)
In addition to the above detail, the Application is included as Attachment 5 for further details. In the event of a direct conflict between Exhibit F language above and the Application, this Exhibit F supersedes the Application, to the extent of the conflict.
Attachments:
1. Grants Network Budget Worksheet
2. Total Activity Budget Worksheet
3. Performance Measures
4. Project Schedule
5. Application
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Passthrough Agency: Report Date: 09/23/2024
Program: Requested By: Nicholas Walker
Project Name/Title: [email protected]
Org Name: CIty of Lakeport
Stage: Pre-Award
Budget Items
Category Title Description Units Unit Cost Extended Cost Direct Cost Indirect Cost GL Account Cost Share Type 0 $0.00 $0.00 $1,156,520.00 $0.00 $0.00
0 $0.00 $0.00 $0.00 $0.00 $0.00
0 $0.00 $0.00 $117,500.00 $0.00 $0.00
Other
Category Title Description Units Unit Cost Extended Cost Direct Cost Indirect Cost GL Account Cost Share Type 0 $0.00 $0.00 $0.00 $0.00 $0.00
0 $0.00 $0.00 $1,274,020.00 $0.00 $0.00
Budget Report, Created by Nicholas Walker, [email protected], 09/23/2024 Source: eCivis™ Portal
http://www.ecivis.com/
California Department of Housing and Community Development 2018 CDBG-MIT RIP Set Aside Project Application
Silveira Community Center ADA Improvements
Attachment 1: Grants Network Budget Worksheet
Activity Delivery Total
Other
Other Total
Grant Total
Activity
Activity Total
General Administration
General Administration Total
Activity Delivery
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
AGENCY: City of Lakeport
PROGRAM: 2018 MIT-RIP
STAGE: Application
REPORT DATE: 03/22/2024
REQUESTED BY: HCD
Title Description Units Unit Cost Extended Cost Direct Cost Indirect Cost Funding Source Engineering and Design Engineering and Design 100% plans for bid $175,127.00 MIT RIP Site Work Construction Existing Conditions $9,000.00 MIT RIP Site Work Construction Concrete $21,250.00 MIT RIP
Site Work Construction Wood, Plastics, And Composites $35,162.00 MIT RIP Site Work Construction Thermal And Moisture Protection $340.00 MIT RIP Site Work Construction Openings $29,000.00 MIT RIP
Site Work Construction Finishes $111,691.00 MIT RIP
Site Work Construction Specialties $21,010.00 MIT RIP
Site Work Construction Plumbing $68,400.00 MIT RIP
Site Work Construction HVAC $22,100.00 MIT RIP
Site Work Construction Electrical $22,100.00 MIT RIP
Site Work Construction Electrical Safety And Security $5,950.00 MIT RIP Site Work Construction Exterior ADA Access and Egress Improvements $157,287.00 MIT RIP Site Work Construction General Conditions $34,600.00 MIT RIP Site Work Construction General Requirements $13,321.00 MIT RIP Site Work Construction Bonds & Insurance $9,848.00 MIT RIP Site Work Construction Contractor's Fee $24,226.00 MIT RIP Site Work Construction Design Contingency $64,200.00 MIT RIP Site Work Construction Environmental Remediation $27,291.00 MIT RIP Site Work Construction Escalation to 12/31/23 (Actual DGS CCCI 18.7% from estimate date to 12/31/23)
$126,557.00 MIT RIP
Site Work Construction Escalation to 12/31/24 (Estimated 9% escalation from 12/31/23 to 12/31/24)
$72,300.00 MIT RIP
Contingency 10% of total Activity Costs $105,760.00 MIT RIP $0.00 $0.00 $0.00
$0.00 $1,156,520.00 $0.00
Title Description Units Unit Cost Extended Cost Direct Cost Indirect Cost Funding Source Project Management &
Construction Support
Vendor management, meetings, reporting, RFP
announcement, vendor selection, contracting, project timeline meetings
$40,000.00 MIT RIP
Project Inspection Daily inspections, reports, and approvals. Provide RFI, change order review and approvals.
$25,000.00 MIT RIP
Environmental Prepare required CEST documentation and support $7,500.00 MIT RIP Contract Support Project reporting, meetings with HCD, fiscal support and draw $ 45,000.00 MIT RIP $0.00 $117,500.00 $0.00
Extended Cost Direct Cost Indirect Cost
$0.00 $1,274,020.00 $0.00
Attachment 2: Total Activity Budget Worksheet
GRANT TOTALS:
BUDGET TEMPLATE
ACTIVITY DELIVERY COSTS
ACTIVITY COSTS
ACTIVITY COST TOTALS:
ACTIVITY DELIVERY COST TOTALS:
Exhibit F City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Attachment 3: Performance Measures
Goal Title Subgoals Work Deliverable
National Objective
# Extremely Low Income (0-30% HAMFI)
# Low-Income (30-50% HAMFI)
# Moderate Income (50-80% HAMFI)
# Above Moderate Income (80-100% HAMFI)
Hispanic Ethnicity
Plus Race of
Beneficiaries
# American Indian/Alaska Native + Hispanic
# American Indian/Alaska Native and Black/African American + Hispanic
# American Indian/Alaska Native and White + Hispanic
# Asian
# Asian and White
# Asian and Black/African American
# Asian and Black/African American and White
# Native Hawaiian/Other Pacific Islander
# Other Multi-Racial + Hispanic
# White
# Unknown Race
# Female Head of Household
Non-Hispanic
Ethnicity Plus Race of
Beneficiaries
# American Indian/Alaska Native
# American Indian/Alaska Native and Black
# American Indian/Alaska Native and White
# Asian
# Asian and White
# Asian and Black/African American
# Asian and Black/African American and White
# Native Hawaiian/Other Pacific Islander
# Other Multi-Racial
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Attachment 3: Performance Measures
Goal Title Subgoals Work Deliverable
# White
# Unknown Race
# Female Head of Household
Targeted Section 3
Labor Hours
# of Section 3 Labor Hours
# of Total Labor Hours
Public Facilities and
Improvements –
Covered and NonCovered Projects
% reduction in loss of service
% reduction in emergency maintenance costs
# of non-invasive species trees planted on project sites # of acres green infrastructure created
# cubic feet of stormwater storage added
# acres of newly added or improved green space
# of Linear miles of Public Improvement
% reduction in energy costs
# of public facilities 1
# of Linear feet of Public Improvement
# of green infrastructure projects constructed
# of acres of native vegetation planted
# of fewer outages of critical facilities and utilities # of buildings (non-residential)
# of vacant lots repurposed
# of acres green space created
# of Non-business Organizations benefitting
# of water control structures repaired/replaced
# of acres with improved multiple hazard risk mapping
# or % Other
Project Status: Phase
active this reporting
period, enter 1.
0%
Pre-Construction
Construction Started
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Attachment 3: Performance Measures
Goal Title Subgoals Work Deliverable
Construction 50% Completed
Construction 100% Completed
Closed-Out
Expenditure Status:
Phase active this
reporting period, enter
1. 0% expended
1-25% expended
26-50% expended
51-75% expended
76-99% expended
100% expended
Contract Milestones:
Phase active this
reporting period, enter
1 1: Execution of AUGF
2: Activity Initiation.
3: First Financial Report submission
4: 50 percent project completion
5: Reimbursement for 75 percent of grant funds submitted to HCD
6: Construction Complete
7: Submission of Final Financial Report and Close-Out
Documents
8. Contract Expiration
Household
Demographics
# Disabled
# Senior
# Homeless
# Foster Youth
# Single-Parent Household
# Veterans
# of Limited English speaking
# Other
Activity Report
Narrative Request:
In the narrative section please include:
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Attachment 3: Performance Measures
Goal Title Subgoals Work Deliverable
1. Summary of work completed in the reporting period
including reference to specific deliverables as indicated in scope of work
2. Report problems or delays during the reporting period or anticipated problems/delays.
3. UNM Only: Measurable impacts narrative:
a. Status update on how the subrecipient is preparing/planning to collect measurable mitigation impacts from the project Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Attachment 4: Project Schedule
Term of Agreement and Performance Milestones
A. Term of Agreement:
All grant funds must be expended at least ninety (90) days prior to the Agreement expiration date.
This Agreement will expire as set forth in Section 2 of the STD 213.
B. Performance Milestones:
Subrecipient shall adhere to the performance milestones as captured in Exhibit F. Time is of the essence with respect to all such milestones. 1) Execution of AUGF by 60 days from the STD 213 execution. 2) Activity Initiation: sixty (60) days from the Execution date of AUGF. Activity Initiation is defined as issue RFP from design professional.
3) First Financial Report submission requesting reimbursement of grant funds by 9 months from STD 213 execution.
4) Project achieves fifty (50) percent completion, as defined by the subrecipient by 12 months from STD 213 execution. This is defined as completion of design and procurement of construction contractor. 5) Project reaches seventy-five (75) percent of grant funds submitted to the Department for reimbursement by 13 months of STD 213 execution defined as 50 percent of construction contractor work completed. 6) Project reaches construction completion by 14 months execution of STD 213. This shall be defined by filing a notice of completion. 7) Subrecipient must submit Final Financial Report and Close-Out Documents to the Department for final approval by the Department at least one hundred and twenty (120) days prior to the agreement expiration date.
8) Agreement Expiration Date is the date as set forth in the STD 213.
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Set Aside Application: CIty of Lakeport - Silveira Community Center ADA Improvements Applications
CIty of Lakeport - Silveira Community Center ADA Improvements A. General Information
Profile
Project Title
Below, please enter the Project Title for your application. This will be used by HCD to track the project.
Project Title Format: [Jurisdiction Name] - [Project Name] Ex: Sacramento, City of – Community Food Bank
1. Project Title
CIty of Lakeport - Silveira Community Center ADA Improvements Applicant Information
2. Select Applicant
City of Lakeport
2a. Please type applicant name exactly as captured in question 2.
City of Lakeport
3. Applicant Street Address
225 Park St
4. Applicant City
Lakeport
5. Applicant State
CA
6. Applicant Zip Code
95453
B. Census Data
Project census location: The census information in this section will be used for legislative and congressional district tracking.
Please use the census information of your primary facility or the designated address of the responsible organization. If you are doing a LMA activity, you will be asked to provide additional census information specific to your service area. It is ok if the information is duplicative.
Use the HUD LMSI mapping tool located at Low- and Moderate-Income Area Data, based on 2011-2015 ACS (https://hud.maps.arcgis.com/home/item.html?id=ffd0597e8af24f88b501b7e7f326bedd) to gather the required census tract information as identified by the address below. For instructions on using the mapping tool visit (link) Identify the census location data for the administrative entity of this application (if this is a county use the County Administration building, if this is a city use City Hall or an administrative facility).
1. Will this project impact more than one census block group? Yes
2. Enter project census block group(s)
Census Tract 4 - Block Group 1,2,3,4,5
C. Project Scope of Work
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Project Location
If the project will occur in more than one place or doesn't have phyiscal address, please use the organization address for reference below.
1. Project Street Address
500 North Main St.
2. Project City
Lakeport
3. Project State
CA
4. Project Zip Code
95453
Project Description
Enter a detailed description of your activity which should include at a minimum: what the activity is, why it is needed, who the beneficiaries will be, where it will take place, how it will be done and when it will be completed. This should be a similar description provided for the NEPA. By completing the narratives below the applicant is demonstrating a knowledge of need for the activity and the steps needed to achieve the desired outcome.
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
5. Project Description
Project Overview
The Silveira Community Center, a public facility owned and operated by the City of Lakeport located at 500 N. Main Street, plays a crucial role in our community by providing a venue for social , recreational, educational, cultural activities and refuge center in times of need. However, the existing facility is lacking ADA ingress/egress access and restroom facilities are outdated, poorly maintained, and inaccessible for people with disabilities. To address these challenges and enhance community resilience, we propose a comprehensive renovation project. This project will include, replacing plumbing, fixtures, flooring, lighting, and ventilation systems, as well as installing grab bars, ramps, wider doors, and lower sinks and toilets. This project aligns with the CDBG-MIT-RIP program’s objectives by emphasizing risk reduction, equity, and community empowerment.
By investing in infrastructure improvements, we create a safer and more inclusive Lakeport.
Project Objectives
1. Mitigation-Related Infrastructure Enhancement:
o Wildfire Risk Reduction: By renovating the facility and restrooms for ADA access, we will contribute to overall community safety during wildfire and other emergency events. Accessible facilities ensure that all individuals, including vulnerable populations, can seek refuge at the center and have access to the facility.
2. Prioritizing Vulnerable and Low-to-Moderate Income (LMI) Populations:
o Accessibility: Installing grab bars, ramps, wider doors, and lower sinks and toilets will benefit people with disabilities, seniors, and families with young children.
o Equitable Access: The renovated restrooms will serve as a vital resource for low-income households lacking adequate facilities at home.
Beneficiaries
The project will directly benefit:
• Community Members: All residents who utilize the Silveira Community Center for events, programs, and gatherings. • People with Disabilities: ADA-compliant restrooms and access will promote inclusivity and dignity. • Seniors: Elderly individuals will find the updated facilities more user-friendly and accessible with wheelchairs, walkers and other aides. • Families with Young Children: Enhanced accessibility accommodates families with strollers and young children. • Low-Income Households: Access to well-maintained facility and restrooms is critical for those facing economic challenges during times of high need and disasters.
Implementation Approach
1. Design Phase:
o Procurement of Licensed Design Professional: Follow Federally required procurement procedures, pursuant to 2 CFR Part 200, to engage a qualified professional to create detailed plans for renovations, emphasizing ADA compliance and disaster resilience. o Competitive Bidding Process: Select contractors through a sealed bid process, as outlined in 2 CFR Part 200 and local/state contract requirements.
2. Construction Phase:
o Contractor Selection: Choose a contractor to execute the renovation work, enter into contract and receive the required bonds. o Supervision: The City’s Public Works Department will oversee construction and approve payments.
Project Timeline
• Start Date: July 1, 2024
• Completion Date: December 31, 2025
• Total Duration: 18 months
Desired Outcome
Upon completion, the Silveira Community Center will offer modern, accessible, and resilient restroom facilities, supporting the well-being of all community members, especially those most vulnerable.
D. Subrecipient Grantee
1. Eligible Applicants may work with a Grantee, called a Subrecipient Grantee, to assist them in implementation of their proposed project. A Subrecipient Grantee is a local government, special district, Tribal Entity, or other similar entity.
2. Does the application include a Subrecipient Grantee? (Unit of local government, special district or similar entity) No
E. Eligible Activity
Eligible CDBG-MIT activities include, but are not limited to, the acquisition, reconstruction, rehabilitation or installation of public facilities and improvements (HCDA Section 105(a)(2) – Public Facilities and Improvements and MIT-RIP P&P 1.2). Choose all eligible type activities that apply to your project.
Choose your eligible activity category from the list. Eligible activities are defined by 24 CFR 570.482 et. Seq.
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
https://www.law.cornell.edu/cfr/text/24/570.482 Please check all that apply.
1. Eligible Activity Category
Installation of Public Facilities and Improvements
2. Explain how your project meets the definition(s) of each of the eligible type activities that you selected in the question above This project meets the definition of Installation of Public Facilities and Improvements because it involves the renovation of an existing public facility (the Silveira Community Center) to improve its accessibility, functionality, and quality for the benefit of the community. The project includes the following eligible type activities:
- Installation of plumbing systems and fixtures in the restrooms - Installation of flooring, lighting, and ventilation systems in the restrooms - Installation of grab bars, ramps, wider doors, and lower sinks and toilets in the restrooms to comply with the ADA standards - Installation of access and egress improvements to the facility These activities will enhance the public facility and improve its service to the community, especially for those with disabilities, seniors, families with young children, and low-income households who lack adequate facilities at home. The project will also increase the resilience of the community center to future disasters by improving its sanitary conditions and safety.
HUD defines mitigation as: Activities that increase resilience and reduce or eliminate the long-term risk of loss of life, injury, damage to and loss of property, and suffering and hardship, by lessening the impact of future disasters. See (MIT-PPS P&Ps Section 2.5 or MIT-RIP section 1.2.3)
3. Provide a detailed description of how the project will meet the definition of mitigation.
The project, in addition to its accessibility and safety enhancements, offers two crucial benefits that squarely meet the criteria of mitigation. First, it significantly improves the existing medical respite facility, which serves as a temporary shelter and care center for homeless or unstably housed individuals during emergencies. By enhancing this facility, we directly address the long-term risk of loss of life, injury, and suffering. Specifically:
1. Medical Respite Facility Enhancement:
o The upgraded medical respite facility will provide a safe haven for those recovering from illness or injury during crises. By offering a clean and secure environment, it reduces the risk of infection and complications for vulnerable populations. o Moreover, this facility doubles as an alternative care site when health services experience a surge in demand due to disasters. By preventing unnecessary hospitalizations and emergency room visits, it contributes to long-term resilience.
Secondly, the project incorporates essential infrastructure elements—namely, an emergency backup generator and solar panels. These additions position the facility as a PG&E community resiliency center during public safety power shutoffs or other power outages. Here’s how this aspect aligns with mitigation:
2. Community Resiliency Center:
o During emergencies, residents can rely on this center for critical services. It ensures access to electricity, cooling, heating, water, Wi-Fi, and other essentials.
o By providing a safe and comfortable space, the community resiliency center mitigates the hardship faced by residents during power disruptions. o Additionally, it fosters better communication and coordination among local agencies and community members, enhancing overall disaster preparedness.
In summary, this project not only bolsters resilience but also significantly reduces suffering and hardship, especially for those most vulnerable to the impacts of future disasters. By addressing both immediate and long-term needs, it exemplifies effective mitigation strategies.
F. Operations and Maintenance Plan (O&M)
HUD requires all Mitigation projects include an Operation and Maintenance Plan (O&M).
Each subrecipients must plan for the long-term operation and maintenance of infrastructure and public facility projects funded with CDBG–MIT funds.
The subrecipients must describe in its maintenance plan how it will fund long-term operation and maintenance for CDBG– MIT projects. Funding options might include State or local resources, borrowing authority or retargeting of existing financial resources. If operations and maintenance plans are reliant on any proposed changes to existing taxation policies or tax collection practices, those changes and relevant milestones should be expressly included in the maintenance plan. Additionally, the subrecipient must describe any State or local resources that have been identified for the operation and maintenance costs of projects assisted with CDBG–MIT funds.
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
1. Please describe how you will plan for long term operations and maintenance of the proposed project Introduction: The Silveira Community Center stands as a vital nexus for community engagement and enrichment within the City of Lakeport. To ensure its continued functionality and service provision, the City of Lakeport has formulated this Operation and Maintenance Plan in alignment with the requirements stipulated by the Community Development Block Grant for Mitigation (CDBG-MIT) funds from HUD.
Funding Strategy: The operation and maintenance costs of the Silveira Community Center will be sustained through a strategic combination of the general fund, borrowing authority, and reallocation of existing financial resources. Funding primarily originates from the general fund, supplemented by user fees and generous donations. In instances of budgetary constraints, options such as municipal bonds will be explored. Any alterations to taxation policies or tax collection practices affecting funding will be vigilantly monitored and addressed accordingly.
Long-Term Planning: Maintenance responsibilities for the Silveira Community Center are entrusted to the Parks, Buildings, and Grounds department. Approximately 20 hours per week will be dedicated to cleaning, landscaping, minor repairs, and general upkeep. Administrative staff will contribute a similar time allocation to oversee day-to-day operations, encompassing event scheduling, rentals, staff management, and regulatory compliance. An emergency preparedness plan will be devised to ensure swift and effective responses to unforeseen circumstances, minimizing disruptions to center activities.
Role of Recreation Program: Recognizing the integral role of recreation, the City of Lakeport is currently developing a Recreation Program tailored to complement the operations of the Silveira Community Center. This program will provide diverse recreational activities and programs for all age groups, further solidifying the center's position as a focal point for community engagement.
Incorporating Public Input: To foster community engagement, the Parks/ Buildings and Grounds Department will actively seek input from the public through surveys, online feedback forms on the department's webpage, and suggestion boxes. This proactive approach enables the gathering of valuable insights and suggestions regarding the maintenance of the Silveira Community Center, thereby enhancing community stewardship and encouraging volunteerism.
Utilizing Community Volunteer Resources: Volunteer engagement will be instrumental in both planning and executing upgrades to the Silveira Community Center. Community members will be actively involved in small-scale improvements and facility beautification projects, fostering a sense of ownership and pride. Moreover, involving community-based interest groups in facility enhancements strengthens relationships between residents and the center, paving the way for sustained care and maintenance.
Conclusion: The City of Lakeport is steadfast in its commitment to ensuring the efficient operation and maintenance of the Silveira Community Center. By leveraging the general fund, engaging community volunteers, and integrating a comprehensive Recreation Program, the city endeavors to uphold the center's standards of service excellence and community enrichment.
G. Most Impacted and Distressed Area (MID)
Projects must benefit the area designated by HUD as the most impacted and distressed areas, or “MID,” within the disaster declared impacted counties under DR-4382 and DR-4407. See MIT-RIP Policies and Procedures Section 1.2.2.
1. Is the project located in a 2018 MID area?
Yes
2. Which 2018 MID area(s) is the project located in or will the project benefit? Lake County
3. Upload map(s) of project service area in relation to the MID area(s).
MAP.pdf
H. HMGP Match
Projects that are approved for FEMA HMGP Match are eligible for non-federal, local match funding under this Program.
1. Is the application being submitted as a FEMA HMGP match project? No
I. Performance Measures
Choose a projected performance measure(s) the project intends to meet. Select all that apply (There are no wrong answers).
1. Infrastructure Performance Measures
# of public facilities
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
2. Based on the projected performance measure(s) selected above please provide an estimated percent or number this project intends to meet. Example: A community food bank project proposes to serve 200 households. Performance Measure: # of households reached Answer: 200 households reached.
Performance Measure: # of public facilities Answer: 1
J. National Objective & Beneficiary Data
Choose the national objective from the list. Criteria for national objectives can be located at 24 CFR 570.483 https://www.law.cornell.edu/cfr/text/24/570.483 and MIT-RIP P&Ps section 1.2
1. National Objective
Low- and Moderate-Income (LMI)
1a. National Objective- LMI
Limited Clientele (LMC)
2. What is the total number of beneficiaries for the project? 1748
3. What is the number of total LMI beneficiaries for the project? 1748
4. Projected LMI beneficiary percentage?
100.00
LMC
To qualify under the LMC national objective, the activity must meet the criteria under HUD’s basically CDBG manual, Chapter 3: 3.2.2 :
https://files.hudexchange.info/resources/documents/Basically-CDBG-Chapter-3-Nat-Obj.pdf
5. How will the project meet the LMC national objective? Benefit a presumed clientele
6. Select the presumed clientele the project will benefit.
Severely Disabled Adults
7. Please describe how the project will serve the selected presumed clientele Let’s delve into how the project City of Lakeport ADA project will primarily benefit the Limited Clientele of Severely Disabled Adults:
1. Enhanced Medical Respite Facility:
o For severely disabled adults, the upgraded medical respite facility plays a pivotal role. It provides a safe and supportive environment for those with disabilities during emergencies.
o Specifically, it offers:
o Accessible Accommodations: The facility ensures that individuals with mobility challenges can navigate comfortably. Features like ramps, wider doorways, and accessible bathrooms cater to their needs. o Specialized Care: Trained staff can address the unique requirements of disabled adults, including assistance with daily living activities, medication management, and mobility support.
o Medical Equipment: The facility is equipped with necessary medical devices, such as adjustable beds, lifts, and assistive technology. o Quiet Spaces: Recognizing sensory sensitivities, quiet areas allow disabled adults to rest and recover without unnecessary disturbances.
2. Community Resiliency Center during times of high need:
o Severely disabled adults often face heightened vulnerability during power outages or other emergencies. The community resiliency center directly addresses their needs:
o Power Backup: With emergency generators, the center ensures uninterrupted power supply for medical equipment (e.g., ventilators, CPAP machines) that disabled adults rely on.
o Climate Control: Heating and cooling systems maintain a comfortable temperature, critical for those with temperature sensitivity. o Communication Services: Access to Wi-Fi and communication devices allows disabled adults to stay connected and seek assistance. o Safe Environment: The center provides a secure space where disabled adults can find refuge during crises.
In summary, this project prioritizes the needs of severely disabled adults by creating a resilient and inclusive environment. By addressing accessibility, specialized care, and emergency preparedness, it aims to reduce suffering and enhance the overall well-being of this vulnerable population.
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
K. HCD Thresholds
Projects must meet one HCD Program Threshold. Details on HCD program threshold compliance documentation, including, when applicable, lists of qualifying geographic areas and maps, are provided in the program Policies and Procedures Appendix B.
Please note:
-If your project is captured as LMI in Section J above it will automatically meet the benefit low-income community threshold. Please select Benefit Low-Income Communities below.
-If your project is LMC and will benefit a presumed clientele of elderly persons, it will automatically meet the benefit senior citizens thresholds. Please select Benefit Senior Citizens below.
-If your project is LMC and will benefit a presumed clientele of severely disabled adults, it will automatically meet the benefit persons with disabilities thresholds. Please select Benefit Persons with Disabilities Below. -If your project is an HMGP match project it will automatically meet the leverage threshold. Please select Leverage CalOES, CalFire, or other Funding Source below.
1. Select the HCD Program Threshold the project will meet:
Benefit low resource communities
Threshold: Benefit Low Resource Communities
To meet the HCD program threshold "Benefit Low Resource Communities" the project must qualify under the following definition (See Appendix C of Policies and Procedures):
Project must be located in a census tract with:
A Social Vulnerability Index (SVI) of greater than 0.5 or a local to state median income ratio of less than 0.8; AND
A total hazard risk percentile greater than 0.6 OR a single hazard percentile greater than 0.8.
2. Enter the low resource community census tract(s) the project is located in or will benefit.
Census Tract 4
3. Upload map of project location/service area and selected Census Tract(s) Map Zoom.pdf
L. Milestones
Milestones provided in this section will become part of the Standard Agreement. Complete the milestones by providing a length of time to complete each. For example: “90 days from STD 213 execution.”
Please note: Milestone #1 must be completed no later than 60 days after execution for the STD 213.
Additional milestones are optional.
1. Enter proposed length of time to meet Milestone #1 - Execution of Authority to Use Grant Funds (AUGF) 60 days from STD 213 execution
2. Enter proposed length of time to meet Milestone #2 - Construction Initiation 240 days from STD 213 execution
3. Enter proposed length of time to meet Milestone #3 - First financial report submission 180 days from STD 213 execution
4. Enter proposed length of time to meet Milestone #4 - 50 percent project completion 330 days from STD 213 execution
5. Enter proposed length of time to meet Milestone #5 – Reimbursement for 75 percent of grant funds submitted 375 days from STD 213 execution
6. Enter proposed length of time to meet Milestone #6 – Construction Complete 420 days from STD 213 execution
Final financial report and closeout documents must be submitted to HCD following completion of the project and at least 120 days prior to contract expiration to allow time for HCD to complete review, processing, and closeout activities.
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
7. Enter proposed length of time to meet Milestone #7 – Submission of final financial report and close-out documents 545 days from STD 213 execution
The final milestone is the contract expiration date, which is the date by which all project activity, reporting, monitoring, and closeout activities must be completed. The contract expiration date is 72 months from execution of the STD 213.
8. Enter proposed length of time to meet Final Milestone: contract expiration 1095 days from STD 213 execution
If you would like to add additional milestones, please detail them below.
M. Project Budget
HCD must review projects submitted for funding in terms of cost reasonableness, in accordance with federal regulations found at 2 CFR 200. To fulfill this requirement all projects must be able to support the CDBG-MIT funding request with an explanation of how the amount was determined.
Additionally, projects submitted for CDBG-MIT funding, where CDBG-MIT funding will not fund 100% of the project, must demonstrate that other funds are committed and available to complete the project. The Total Project Budget template found in the application files must be completed to demonstrate the total project cost as well as any other sources of funding.
Funded projects will use Grants Network to submit financial drawdown/reimbursement requests; therefore, the linked eCivis budget must be completed.
1. CDBG-MIT Funding Amount Requested
$1,274,020
2. Provide a basis for the requested funding amount (select all that apply) Cost Estimate
3. Does the CDBG-MIT funding request equal the total budget amount? Yes
Total Project Budget (Excel) – must be uploaded using the Workbook Template provided in the application files. The workbook must include the amount requested for this program as well as all other sources. Reminder, the eCivis Budget must also be completed.
7. Upload the Total Project Budget (Excel template)
App K_Total Project Budget Template.xlsx
CDBG-MIT budgets found in the Grants Network portal are required at application submission. Required budget information includes direct costs only. Direct costs for activity must be completed and clearly identified. Do not include any information on indirect cost, match, or cost share.
Applications submitted without a complete Grants Network budget will be disqualified without exception or appeal.
8. Have you completed and submitted your CDBG-MIT budget in eCivis? Yes
Budget narrative should include information about activity viability if the project is only partially funded. For instance, can the project scope be reduced the number of beneficiaries be reduced, can the project be scaled to the amount of funding available. Include budget information that describes your activity budget as uploaded. Make sure the budget narrative has a relationship to the tasks and deliverables described in the application. Applications submitted without a complete Grants Network budget narrative will be disqualified without exception or appeal.
9. Have you completed a detailed narrative of your activity budget within the Grants Network budget template? Yes
N. Supplemental Application Information
If there is any supplemental information you would like to provide, please use the following field to provide any additional information in a single file upload. Note: this is not a required field.
1. Supplemental Upload
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Silveira Communty Center ADA Improvements
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 9/20/2024
Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008 NOFA Date: 11/14/2023 Approved Date: 12/7/2023 Prep. Date: 9/20/2024 Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008 NOFA Date: 11/14/2023 Approved Date: 12/7/2023 Prep. Date: 9/20/2024 Exhibit F
City of Lakeport
18-MITRIP-23008
18-MITRIP-23008 NOFA Date: 11/14/2023 Approved Date: 12/7/2023 Prep. Date: 9/20/2024 City of Lakeport
18-MITRIP-23008
EXHIBIT G
SUBRECIPIENT PROFILE
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/24/2024
City of Lakeport
18-MITRIP-23008
EXHIBIT G
SUBRECIPIENT PROFILE
18-MITRIP-23008
NOFA Date: 11/14/2023
Approved Date: 12/7/2023
Prep. Date: 09/24/2024
Meeting Date: 12/16/2025 Page 1 Agenda Item # VII.C.1.
425664.1
CITY OF LAKEPORT
City Council
City of Lakeport Municipal Sewer District
Lakeport Redevelopment Successor Agency
Lakeport Industrial Development Agency
Municipal Financing Agency of Lakeport
STAFF REPORT
RE: Acquisition of Real Property and Drainage Easements for Forbes Creek Headwall Replacement and Hartley Street
Culvert Repair Projects.
MEETING DATE: 12/16/2025
SUBMITTED BY: Ron Ladd, Public Works Director
PURPOSE OF REPORT: Information only Discussion Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:
The City Council is being asked to approve four (4) separate resolutions approving and authorizing the acquisition of certain portions of real property and drainage easements from four (4) individual property owners to facilitate the construction and maintenance of the Forbes Creek Headwall Replacement and Hartley Street Culvert Repair.
BACKGROUND/DISCUSSION:
After the flooding in 2019, the City received federal funding through the Emergency Relief program to repair two areas damaged by the storms. The first project consists of replacing a headwall on the east side of Main Street at Forbes Creek (Forbes Creek Headwall Replacement Project). The second project consists of replacing a culvert and headwall on Hartley Street, north of the Anastasia Drive intersection (Hartley Street Culvert Repair Project).
City Council approved a Professional Services Agreement with Dokken Engineering on January 18, 2022 for environmental and right of way services. The environmental document was approved in May of 2023. Soon after, the authorization was granted to begin the right of way phase. Through the design process it was determined that the construction of the Forbes Creek Headwall Replacement Project requires two (2) fee acquisitions of right of way from property owners to the immediate north and south of the project. The Hartley Street Culvert Repair Project requires drainage easements from two (2) property owners for construction. The easements will also allow the City access to the storm drain system for maintenance.
Federal funding requires that any right of way acquisition, including easements, must follow the Uniform Relocation Assistance and the Real Property Acquisition Policies Act of 1970 as amended in 1987 (Uniform Act), as well as comply with all requirements of Title VI of the 1964 Civil Rights Act. Dokken Engineering has provided the right of way services, in compliance with all federal and state requirements, to get the City to the point of acquiring the right of way and easements necessary to move towards construction.
A summary of the right of way acquisition for each project is as follows:
Forbes Creek Headwall Replacement Project
• Savings Bank of Mendocino County, APN 025-331-140, Fee Acquisition of 728 square feet valued at $9,500
Meeting Date: 12/16/2025 Page 2 Agenda Item # VII.C.1.
425664.1
• H&S Energy, LLC, APN 025-331-080, Fee Acquisition of 52.55 square feet valued at $1,000
Hartley Street Culvert Repair
• Adam & Alexander Metaxas, APN 026-021-340, Drainage Easement, 1,000 square feet valued at $1,000
• Lakeport Unified School District, APN 026-031-180, Drainage Easement, 2,400 square feet valued at $1,700
Staff recommends the City Council approve a resolution for the acquisition of right of way and drainage easements from four property owners for the Forbes Creek Headwall Replacement and Hartley Street Culvert Repair Projects.
ENVIRONMENTAL COMPLIANCE
The approval and acceptance of the grants of property and easements contemplated herein are components of larger projects which have been previously analyzed for purposes of the California Environmental Quality Act (CEQA). The City filed a Notice of Exemption for the Forbes Creek Headwall Replacement Project (SCH # 2023100871) on or about October 30, 2023, finding said project to be exempt from CEQA pursuant to CEQA Guidelines sections 15269(b) and 15269(c). The City filed a Notice of Exemption for the Hartley Culvert Repair (SCH # 2023100872) on or about October 30, 2023, finding said project to be exempt from CEQA pursuant to CEQA Guidelines sections 15269(b) and 15269(c). There are no substantial changes proposed to these projects, no substantial changes to the circumstances under which these projects are being undertaken, and no new information of substantial importance which would merit further environmental analysis.
OPTIONS:
1. Approve and adopt the Resolutions,
2. Do not approve and adopt the Resolutions,
3. Offer other recommendations or alternative direction to staff.
FISCAL IMPACT:
None $13,200 Budgeted Item? Yes No
Budget Adjustment Needed? Yes No If yes, amount of appropriation increase: $ Affected fund(s): General Fund Water OM Fund Sewer OM Fund Other:
Comments: FHWA ER funding is provided at an 88.53% reimbursement ratio, leaving a match of 11.47% to be covered by local funds. With the reimbursement ratio applied to the total, $1,514.04 will be covered by local funds for the right of way and drainage easement acquisition.
Meeting Date: 12/16/2025 Page 3 Agenda Item # VII.C.1.
425664.1
COUNCIL PRIORITIES:
☒ Priority #1: Public Safety & Crisis Response
☒ Priority #2: Disaster Resiliency
☐ Priority #3: Good Governance & Fiscal Stability
☐ Priority #4: Capital Infrastructure Improvement
☐ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☐ Priority #6: Economic Development
SUGGESTED MOTIONS:
Move to adopt all four resolutions approving and authorizing the City Manager to execute contracts, and all other necessary documents, for the acquisition of right of way and drainage easements from property owner’s Savings Bank of Mendocino County, H&S Energy, LLC., Metaxas, and Lakeport Unified School District.
Attachments: 1. Resolution No. ____ - APN 026-031-180, LUSD
2. Resolution No. ____ - APN 026-021-340, Metaxas
3. Resolution No. ____ - APN 025-331-080, H&S Energy
4. Resolution No. ____ - APN 025-331-140, Savings Bank of Mendocino County
5. Savings Bank of Mendocino-Right of Way Contract
6. Savings Bank of Mendocino-Grant Deed
7. H&S Energy, LLC-Right of Way Contract
8. H&S Energy, LLC-Grant Deed
9. Adam and Alexander Metaxas-Right of Way Contract
10. Adam and Alexander Metaxas-Drainage Easement Deed
11. Lakeport Unified School District-Right of Way Contract
12. Lakeport Unified School District-Drainage Easement Deed 425656.1
RESOLUTION NO. XXX___ ( 2025 )
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKEPORT
AUTHORIZING AND DIRECTING THE CITY MANAGER TO ACCEPT DRAINAGE
EASEMENT GRANT, EXECUTE THE RIGHT OF WAY CONTRACT, AND EXECUTE
THE CERTIFICATE OF ACCEPTANCE AND CONSENT TO RECORDATION FOR SAME
WHEREAS, the City of Lakeport desires to obtain a Drainage Easement upon, over, under, and across a portion of real property identified as Assessor’s Parcel Number (APN) 026-031-180 located in the County of Lake, California (“Property”) from Lakeport Unified School District, a political subdivision of the State of California (“Property Owner”) for completion of the Hartley Street Culvert Repair Project; and
WHEREAS, the City has negotiated terms and reached a tentative agreement with the Property Owner for the grant of this Drainage Easement upon, over, under, and across the Property, as set forth in the Right of Way Contract attached hereto as Exhibit “A” and incorporated herein by reference; and
WHEREAS, Government Code section 27281 requires the City, as grantee, to accept the grant, and allows the City to authorize the City Manager to accept and consent to said grant.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKEPORT AS FOLLOWS:
1. RECITALS. The recitals set forth above are true and correct and incorporated herein by reference.
2. AUTHORIZATION. The City Manager is hereby authorized and directed to (1) Execute the Right of Way Contract with the Property Owner attached hereto as Exhibit “A” to obtain a Drainage Easement upon, over, under, and across the Property for a purchase price not to exceed $1,700.00, in addition to such other associated escrow and transaction costs; (2) Execute the Certificate of Acceptance and Consent to Recordation to accept the Drainage Easement on behalf of the City of Lakeport; (3) record the Drainage Easement Deed conveying the Drainage Easement to the City in the official records of the County of Lake; and (4) to execute such other instruments and take such other actions necessary to carry out the intent of this Resolution.
3. EFFECTIVE DATE. This Resolution shall take effect immediately upon its adoption by the City Council.
4. CERTIFICATION. The City Clerk shall certify the adoption of this Resolution.
The foregoing Resolution was adopted at a regular meeting of the City Council of the City of Lakeport held on the on the 16th day of December 2025 by the following vote:
425656.1
AYES:
NOES:
ABSTAIN:
ABSENT:
APPROVED:
_______________________________
Mayor
City of Lakeport
ATTEST:
_________________________________
Kelly Buendia, City Clerk
City of Lakeport
425653.1
RESOLUTION NO. XXX___ ( 2025 )
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKEPORT
AUTHORIZING AND DIRECTING THE CITY MANAGER TO ACCEPT DRAINAGE
EASEMENT GRANT, EXECUTE THE RIGHT OF WAY CONTRACT, AND EXECUTE
THE CERTIFICATE OF ACCEPTANCE AND CONSENT TO RECORDATION FOR SAME
WHEREAS, the City of Lakeport desires to obtain a Drainage Easement upon, over, under, and across a portion of real property identified as Assessor’s Parcel Number (APN) 026-021-340 located in the County of Lake, California (“Property”) from Adam Metaxas and Alexander Metaxas (“Property Owners”) for completion of the Hartley Street Culvert Repair Project; and WHEREAS, the City has negotiated terms and reached a tentative agreement with the Property Owners for the grant of this Drainage Easement upon, over, under, and across the Property, as set forth in the Right of Way Contract attached hereto as Exhibit “A” and incorporated herein by reference; and
WHEREAS, Government Code section 27281 requires the City, as grantee, to accept the grant, and allows the City to authorize the City Manager to accept and consent to said grant.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKEPORT AS FOLLOWS:
1. RECITALS. The recitals set forth above are true and correct and incorporated herein by reference.
2. AUTHORIZATION. The City Manager is hereby authorized and directed to (1) Execute the Right of Way Contract with the Property Owners attached hereto as Exhibit “A” to obtain a Drainage Easement upon, over, under, and across the Property for a purchase price not to exceed $1,000.00, in addition to such other associated escrow and transaction costs; (2) Execute the Certificates of Acceptance and Consents to Recordation to accept the Drainage Easement on behalf of the City of Lakeport; (3) record the Drainage Easement Deeds conveying the Drainage Easement to the City in the official records of the County of Lake; and (4) to execute such other instruments and take such other actions necessary to carry out the intent of this Resolution.
3. EFFECTIVE DATE. This Resolution shall take effect immediately upon its adoption by the City Council.
4. CERTIFICATION. The City Clerk shall certify the adoption of this Resolution.
The foregoing Resolution was adopted at a regular meeting of the City Council of the City of Lakeport held on the on the 16th day of December 2025 by the following vote:
425653.1
AYES:
NOES:
ABSTAIN:
ABSENT:
APPROVED:
_______________________________
Mayor
City of Lakeport
ATTEST:
_________________________________
Kelly Buendia, City Clerk
City of Lakeport
425651.1
RESOLUTION NO. XXX___ ( 2025 )
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKEPORT
AUTHORIZING THE ACQUISITION OF A PORTION OF PROPERTY IDENTIFIED AS ASSESSOR PARCEL NUMBER 025-331-080 AND AUTHORIZING THE CITY
MANAGER TO EXECUTE THE RIGHT OF WAY CONTRACT AND CERTIFICATE OF
ACCEPTANCE AND CONSENT TO RECORDATION FOR SAME
WHEREAS, the City of Lakeport desires to acquire portions of real property identified as Assessor’s Parcel Number (APN) 025-331-080 located in the County of Lake, California (“Property”) from H&S Energy, LLC, a California limited liability company, for completion of the Forbes Creek Headwall Replacement Project; and
WHEREAS, the City has negotiated terms and reached a tentative agreement with H&S Energy, LLC for the grant of this Property, as set forth in the Right of Way Contract attached hereto as Exhibit “A” and incorporated herein by reference; and
WHEREAS, Government Code section 27281 requires the City, as grantee, to accept the grant, and allows the City to authorize the City Manager to accept and consent to said grant.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKEPORT AS FOLLOWS:
1. RECITALS. The recitals set forth above are true and correct and incorporated herein by reference.
2. AUTHORIZATION. The City Manager is hereby authorized and directed to (1) Execute the Right of Way Contract with H&S Energy, LLC attached hereto as Exhibit “A” to purchase the Property for a purchase price not to exceed $1,000.00, in addition to such other associated escrow and transaction costs; (2) Execute a Certificate of Acceptance and Consent to Recordation to accept the Property on behalf of the City of Lakeport; (3) record the grant deed conveying the Property to the City in the official records of the County of Lake; and (4) to execute such other instruments and take such other actions necessary to carry out the intent of this Resolution.
3. EFFECTIVE DATE. This Resolution shall take effect immediately upon its adoption by the City Council.
4. CERTIFICATION. The City Clerk shall certify the adoption of this Resolution.
The foregoing Resolution was adopted at a regular meeting of the City Council of the City of Lakeport held on the on the 16th day of December 2025 by the following vote:
AYES:
425651.1
NOES:
ABSTAIN:
ABSENT:
APPROVED:
_______________________________
Mayor
City of Lakeport
ATTEST:
_________________________________
Kelly Buendia, City Clerk
City of Lakeport
425648.1
RESOLUTION NO. XXX___ ( 2025 )
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKEPORT
AUTHORIZING THE ACQUISITION OF A PORTION OF PROPERTY IDENTIFIED AS ASSESSOR PARCEL NUMBER 025-331-140 AND AUTHORIZING THE CITY
MANAGER TO EXECUTE THE RIGHT OF WAY CONTRACT AND CERTIFICATE OF
ACCEPTANCE AND CONSENT TO RECORDATION FOR SAME
WHEREAS, the City of Lakeport desires to acquire portions of real property identified as Assessor’s Parcel Number (APN) 025-331-140 located in the County of Lake, California (“Property”) from Savings Bank of Mendocino County, a California corporation, for completion of the Forbes Creek Headwall Replacement Project; and
WHEREAS, the City has negotiated terms and reached a tentative agreement with Savings Bank of Mendocino County for the grant of this Property, as set forth in the Right of Way Contract attached hereto as Exhibit “A” and incorporated herein by reference; and WHEREAS, Government Code section 27281 requires the City, as grantee, to accept the grant, and allows the City to authorize the City Manager to accept and consent to said grant.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKEPORT AS FOLLOWS:
1. RECITALS. The recitals set forth above are true and correct and incorporated herein by reference.
2. AUTHORIZATION. The City Manager is hereby authorized and directed to (1) Execute the Right of Way Contract with Savings Bank of Mendocino County attached hereto as Exhibit “A” to purchase the Property for a purchase price not to exceed $9,500.00, in addition to such other associated escrow and transaction costs; (2) Execute a Certificate of Acceptance and Consent to Recordation to accept the Property on behalf of the City of Lakeport; (3) record the grant deed conveying the Property to the City in the official records of the County of Lake; and (4) to execute such other instruments and take such other actions necessary to carry out the intent of this Resolution.
3. EFFECTIVE DATE. This Resolution shall take effect immediately upon its adoption by the City Council.
4. CERTIFICATION. The City Clerk shall certify the adoption of this Resolution.
The foregoing Resolution was adopted at a regular meeting of the City Council of the City of Lakeport held on the on the 16th day of December 2025 by the following vote:
AYES:
425648.1
NOES:
ABSTAIN:
ABSENT:
APPROVED:
_______________________________
Mayor
City of Lakeport
ATTEST:
_________________________________
Kelly Buendia, City Clerk
City of Lakeport
Meeting Date: 12/16/2025 Page 1 Agenda Item # VII.C.2.
CITY OF LAKEPORT
City Council
City of Lakeport Municipal Sewer District
Lakeport Redevelopment Successor Agency
Lakeport Industrial Development Authority
Municipal Financing Agency of Lakeport
STAFF REPORT
RE: Adoption of a Resolution Approving the 2025 Lake County Stormwater Resources Plan (SWRP), Authorizing Staff to
Forward the Adopted Plan to the State Water Resources
Control Board (SWRCB) and Applicable Clean Water Program Partner Agencies, and Directing Staff to Use the SWRP to Guide Future Stormwater and Watershed Planning Efforts.
MEETING DATE: 12/16/2025
SUBMITTED BY: Ron Ladd, Public Works Director – Presenter Jen Baker, Compliance Officer – Preparer
PURPOSE OF REPORT: Information only Discussion Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:
Adopt a resolution approving the 2025 Lake County Stormwater Resources Plan (SWRP); authorizing staff to forward the adopted plan to the State Water Resources Control Board (SWRCB) and applicable Clean Water Program partner agencies; and directing staff to use the SWRP to guide future stormwater and watershed program planning, project development, and grant application activities.
BACKGROUND/DISCUSSION:
Senate Bill 985 (SB 985), the Storm Water Management Planning Act of 2014, requires California jurisdictions to adopt a Stormwater Resources Plan to remain eligible for state bond-funded stormwater and dry-weather runoff capture grants issued after 2014. Adoption of an SWRP is a procedural requirement for participation in Proposition-based stormwater funding programs administered by the State Water Resources Control Board (SWRCB).
The 2025 Lake County Stormwater Resources Plan establishes a countywide framework for capturing, managing, and beneficially using stormwater and dry-weather runoff. The plan aligns with the State’s multi-benefit watershed objectives, including groundwater recharge, flood-risk reduction, water-quality improvement, habitat restoration, climate resilience, and support for disadvantaged communities.
During plan development, the Lake County Watershed Protection District solicited project submittals from local jurisdictions and partner agencies. Seventeen projects were received and evaluated using a standardized metricsbased scoring methodology consistent with the 2015 SWRCB SWRP Guidelines, ensuring transparent and defensible prioritization for future grant cycles.
Adoption of the SWRP does not obligate the City of Lakeport to fund or construct any listed projects. Rather, it:
Meeting Date: 12/16/2025 Page 2 Agenda Item # VII.C.2.
• Maintains the City’s eligibility for state and federal stormwater and watershed grant programs; • Provides a unified regional strategy for watershed management and climate resilience; • Supports future project planning, design development, and prioritization; • Strengthens inter-agency coordination across the Clean Water Program; and • Positions City staff to apply for competitive multi-benefit grants.
The Lake County Clean Water Program Management Council placed adoption of the SWRP on its November 20, 2025 agenda as a noticed action item and took formal action to recommend approval and adoption of the plan by participating City Councils and County governing bodies.
OPTIONS:
1. Adopt the resolution as presented.
2. Adopt the resolution with modifications and provide direction to staff.
3. Take no action.
ENVIRONMENTAL IMPACT:
The adoption of the Stormwater Resources Plan is not a project subject to the California Environmental Quality Act (CEQA) pursuant to sections 15061(b)(3), 15306, and 15378(b)(4) of the CEQA Guidelines as an administrative and information gathering activity that has no potential to result in either a direct or indirect physical change in the environment. Adoption of the SWRP does not commit the City to construct any listed project; implementation of any activity or project included in the Stormwater Resources Plan will be subject to compliance with CEQA.
FISCAL IMPACT:
None (Grant Funded) $ Budgeted Item? Yes No
Budget Adjustment Needed? Yes No . If yes, amount of appropriation increase: $ 0 Affected fund(s): General Fund Water OM Fund Sewer OM Fund Other: Special Revenue/Grant Comments:
This is a reimbursement grant; no local match; no General Fund impact.
COUNCIL PRIORITIES:
☐ Priority #1: Public Safety & Crisis Response
☒ Priority #2: Disaster Resiliency
☐ Priority #3: Good Governance & Fiscal Stability
☒ Priority #4: Capital Infrastructure Improvement
☒ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☐ Priority #6: Economic Development
SUGGESTED MOTIONS:
Move to adopt a resolution approving the 2025 Lake County Stormwater Resources Plan (SWRP); authorizing staff to forward the adopted plan to the State Water Resources Control Board (SWRCB) and applicable Clean Water Program partner agencies; and directing staff to use the SWRP to guide future stormwater and watershed planning, project development, and grant application activities.
Meeting Date: 12/16/2025 Page 3 Agenda Item # VII.C.2.
Attachments: 1. Proposed Resolution – Adoption of the 2025 Lake County Stormwater Resources Plan (SWRP)
2. Clean Water Council Executive Summary – 2025 Lake County Stormwater Resources Plan
RESOLUTION NO. ____ (2025)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKEPORT APPROVING AND ADOPTING THE 2025 LAKE COUNTY STORMWATER
RESOURCES PLAN
WHEREAS, Senate Bill 985 (SB 985) requires jurisdictions to adopt a Stormwater Resources Plan (SWRP) as a precondition for eligibility to receive state bond-funded stormwater and dry-weather runoff capture grants issued after 2014; and WHEREAS, the 2025 Lake County Stormwater Resources Plan provides the Staterequired framework to capture, manage, and beneficially use stormwater and dry-weather runoff, thereby ensuring that Lake County and its municipalities remain eligible for Proposition-based and other state and federal funding programs; and WHEREAS, the SWRP inventories projects submitted by local jurisdictions and agencies across the Clear Lake Basin and evaluates them using a standardized, metrics-based scoring system consistent with the 2015 State Water Resources Control Board guidelines, allowing the region to prioritize multi-benefit stormwater, watershed, flood-management, and water-quality improvements; and
WHEREAS, adoption of the SWRP does not commit the City to construct any listed project, allocate local funds, or authorize immediate implementation, but rather establishes an administrative foundation for continued participation in future grant cycles and inter-agency coordination; and
WHEREAS, the Stormwater Resources Plan advances the City’s goals for watershed protection, environmental stewardship, groundwater recharge, flood-risk reduction, climate adaptation, and long-term infrastructure resilience; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lakeport hereby approves and adopts the 2025 Lake County Stormwater Resources Plan and finds the adoption of the Stormwater Resources Plan exempt from the California Environmental Quality Act pursuant to CEQA Guidelines sections 15378(b)(4), 15306, and 15061(b)(3).
BE IT FURTHER RESOLVED that City staff is authorized and directed to use the Stormwater Resources Plan to guide future stormwater and watershed planning, project development, inter-agency coordination, and grant-application efforts.
BE IT FURTHER RESOLVED that City staff is authorized and directed to forward the adopted Stormwater Resources Plan to the State Water Resources Control Board (SWRCB) and to applicable Clean Water Program partner agencies, as required to maintain eligibility for Proposition-funded and other state stormwater and watershed grant programs.
AYES:
NOES:
ABSTAIN:
ABSENT:
Approved:
________________________________
Kim Costa, Mayor
City of Lakeport
Attest:
_____________________________
Kelly Buendia, City Clerk
City of Lakeport
.
LakeCountyCleanWaterProgram
StormwaterResourcesPlan
EXECUTIVE SUMMARY
Overview
The 2025 Stormwater Resources Plan (SWRP) provides the framework required under California Senate Bill 985 (SB 985) to keep Lake County and its municipalities eligible for state and federal grant funding for stormwaterandwatershedimprovementprojects.SB985(Water Code §10560 et seq.) makes the adoption of a Stormwater Resource Plan a mandatory precondition for receiving any bond-funded stormwater or dry-weather runoff capture grants issued after 2014.
Purpose and Regulatory Background
This plan establishes a county-wide strategy to capture, manage, and beneficially use stormwater and dry-weather runoff. By formally adopting the SWRP, Lake County meets the eligibility criteria for future Proposition-based funding programs (e.g., Propositions 1 and 68) and any subsequent bonds that fund multi-benefit stormwater, flood-management, or water-quality projects.
While the plan inventories specific projects, eligibility for funding is not limited to those listed. Any future project that meets SWRP criteria and demonstrates multi-benefit water-resource, flood, and environmental outcomes may be submitted for funding once the plan is officially adopted. Adoption is therefore a procedural requirement that opens the door to continued participation in State Water Resources Control Board (SWRCB) grant programs.
Plan Development and ProjectIdentification
The Lake County Watershed Protection District issued a public call for submittals in 2024 and received 17 projects from local jurisdictions and partner agencies. Project narratives appear on pages 16 through 42 of the plan.
These projects span feasibility studies, planning, design, and construction, addressing needs such as groundwater recharge, detention basins, flood-control improvements, creek restoration, and drainage upgrades across theClear Lake Basin and tributary watersheds.
Each project description provides a consistent analysis of potential benefits to water quality, groundwater recharge, flood reduction, and community enhancement. Together, they demonstrate an integrated watershed-management approach that meets the intent of SB985 to view stormwater as a resource rather than a waste stream.
ProjectEvaluation andScoring
To maintain transparency and prioritize investments, a metrics-based ranking system was applied following the 2015 SWRCB SWRP Guidelines.
Section5oftheplan(pages43–45)details thescoringmethodology.
Each project was evaluated against quantitative criteria such as water-supply benefits, floodmanagement value, habitat restoration, benefits to disadvantaged communities, and multi-objective integration.
A weighted average score (0–100 scale) was assigned to identify high-value, multi-benefit projects for potential funding.
This standardized scoring provides a defensible, data-driven way to rank local priorities for upcoming grant cycles.
Implementation and Benefits
Adopting theSWRPdoesnotcommitlocalfundsorauthorizeimmediateconstruction.Rather, it positions Lake County and its cities to:
Qualify forfuture state and federal stormwater and watershed funding opportunities.
Compete more effectively for multi-benefit grants that support water-quality improvement, flood-risk reduction,habitatrestoration,andclimateresilience.
Strengthen collaboration among agencies and align project planning with the County’s groundwater sustainability,flood-control,andclimate-adaptationgoals.
Conclusion and Council Recommendation
Adoption of the 2025 Stormwater Resources Plan is a strategic administrative requirement that preserves LakeCounty’seligibility formillionsofdollarsinfuturegrantfunding.
The plan does not bind the watershed to construct any listed project, nor does it limit future opportunities.
It simply provides the State-mandated framework that keeps Lake County grant-ready for upcoming funding cycles.
Recommendation:
That the Clean Water Council approve the 2025 Lake County Stormwater Resources Plan (SWRP) and forward a recommendation to the Board of Supervisors andCityCouncil Members for formal adoption.
Approval will authorize staff to coordinate with partner agencies on next-phase project planning and maintain Lake County’s standing for Proposition-based and other state-sponsored funding opportunities.
Planning Report
STORMWATER RESOURCES PLAN
LAKE COUNTY, CALIFORNIA
Lake County Clean Water Program
Lake County Water Resources Department
255 N Forbes Street, Room 309
Lakeport, CA 95453
City of Clearlake
14050 Olympic Dr.
Clearlake, Ca 95422
City of Lakeport
225 Park Street
Lakeport, CA 95453
Rev. March, 2025
Prepared by:
California Rural Water Association and
MC Engineering, Inc.
Stormwater Resources Plan
TABLE OF CONTENTS
Introduction .................................................................................................................................... 1 SWRP Requirements
Planning Area Description .............................................................................................................. 2 Lake County Aquifers
Lake County Surface Water
Lake County Water Usage
Stormwater Resources Components ............................................................................................. 7 Local Water Supply Augmentation
Pollution and Stormwater Runoff Reduction
Re-Establishment of Natural Treatment and Infiltration
Restoration of Open Space and Habitat
Public Lands in Lake County
BMPs for Stormwater Management
Activities that Pollute or Impair Stormwater
SWRP Implementation Tools
Stormwater Resource Project Database ........................................................................................ 14 Stormwater Resource Project Ranking ........................................................................................... 43 Attachments:
A- Stormwater Resource Plan Self-Certification Checklist Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 1
1.0 INTRODUCTION
This document outlines the 2025 Stormwater Resources Plan (SWRP) for Lake County. It details strategies and measures designed to manage stormwater and dry weather runoff effectively. The plan aims to optimize water resources, improve water quality, and provide environmental and community benefits throughout the Clear Lake Basin and other Lake County Watersheds.
1.1 SWRP REQUIREMENTS
Senate Bill 985 (SB 985), the Storm Water Management Planning Act of 2014, implemented through the Water Code Section 10560 requires a Storm Water Resource Plan (SWRP) as a condition of receiving grant funds for stormwater and dry weather runoff capture projects from any bond approved by voters after January 2014. The intent of SB 985 is to encourage the use of stormwater and dry weather runoff as a resource to maximize water supply, water quality, flood management, environmental, and other community benefits within the watershed.
The nine key stormwater resource components as outlined in 10562-D are outlined in Attachment A to this Plan.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 2
2.0 PLANNING AREA DESCRIPTION
Lake County is in the Northern California coastal mountain range, approximately 80 miles north of San Fransisco. This Stormwater Resources Plan addresses stormwater throughout the entire Lake County. The vicinity of Lake County is illustrated in Figure 2.1. Lake County contains several major watersheds, the largest of which is the area that drains to Clear Lake (326,000 acres or 40% of Lake County). Other significant watersheds1 include the Eel River/Lake Pillsbury, the Indian Valley Reservoir Watershed, the Putah Creek Watershed, and the North Fork Cache Creek Watershed.
Please refer to Section 1.6 of the Lake County 319 Watershed Plan for a graphic illustrating the extent of each watershed along with HUC 10 and 12 sub-watershed maps. Section 1.6 of the 319 Watershed Plan also includes a map of surface water tributaries in Lake County.
Figure 2.1- Lake County Vicinity Map
1 These “watershed” names are conceptual. Please refer to HUC 10 and 12 maps for official USGS watershed names and delineations.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 3
2.1 LAKE COUNTY AQUIFERS
The California Department of Water Resources (DWR) has designated 12 primary aquifers within Lake County. Most of these aquifers have not significantly declined over the last century. The seven aquifers that surround Clear Lake have the advantage of being recharged year round by the lake. A cursory review of DWR and Lake County monitoring data indicates that during the summer months the water level of these aquifers declines at a slower rate than other aquifers outside of the Clear Lake basin. These aquifers exhibit stable water levels even through the past 20 years of drought cycles.
The Big Valley Basin was categorized in California DWR Bulletin 118 as a “medium” priority basin.
This categorization meant that Lake County was required to produce a Groundwater Sustainability Plan (GSP) for the Big Valley Basin to comply with the State Groundwater Management Act (SGMA).
This GSP was published in January 2022. The Big Valley GSP states that the “Big Valley Basin was identified as a medium-priority basin by DWR based on components such as population and groundwater use”. This report explains that the total water use in the basin is estimated at approximately 13,000 AFY (approximately 32% of all agricultural demand in Lake County). The estimated sustainable aquifer yield is between 22,000 and 36,000 AFY and is far greater than the typical aquifer use. Twenty years ago, the Lake County Flood Control and Water Conservation District evaluated the viability of conducting groundwater recharge in the Big Valley Basin. The findings of this study can be found in the “Big Valley Ground Water Recharge Investigation Update” at the County’s groundwater management website.
No other aquifers in Lake County are listed in Bulletin 118. There are five other primary aquifers designated by DWR in Lake County that are not directly recharged by Clear Lake. These aquifers include Gravelly Valley, Long Valley, Collayomi Valley, Coyote Valley, and High Valley.
Please refer to Attachment B of the 2023 Clear Lake Source Water Assessment for more detailed monitoring data and information related to the Upper Lake Valley, Big Valley, Scott’s Valley, Burns, Lower Lake Valley, Clear Lake Cache Formation, Middle Creek, and High Valley Groundwater Basins.
Lake County Staff measure water wells in seven major groundwater basins (Upper Lake Valley, Scott’s Valley, Big Valley, High Valley, Burns Valley, Coyote Valley, and Collayomi Valley). This monitoring data is published at the Lake County Water Resources Department Groundwater Management Program website.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 4
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 5
2.2 LAKE COUNTY SURFACE WATER
Clear Lake is the largest surface water body in Lake County and has a maximum storage capacity of
1.15 million acre-ft. There are many natural lakes and man-made reservoirs within Lake County in addition to Clear Lake.
After Clear Lake, the Indian Valley Reservoir and Lake Pillsbury are the largest water bodies. Water stored in these reservoirs is largely utilized by entities outside of Lake County. Indian Valley Reservoir is a 300,000 acre-ft reservoir across the North fork of Cache creek. Yolo County owns all rights to the water. Lake Pillsbury is an 80,000 acre-ft hydroelectric reservoir maintained by PG&E. According to a recent news article by the Mendocino Voice, PG&E has published a notice to decommission Scott’s dam as the hydroelectric plant is no longer viable. According to a June 2023 presentation by the Russian River Forum, most water rights to the Eel river are held in Humbolt and Mendocino Counties.
Other smaller reservoirs have been constructed in Lake County for the purpose of managing annual winter flooding and providing a reliable source of irrigation water. A detailed list of other notable surface water bodies in Lake County with links to additional information can be found in the Wikipedia Article “List of Lakes of Lake County, California”. Please refer to the map on the following page for the locations of various water bodies.
2.3 LAKE COUNTY WATER USAGE
According to the Lake County Water Resources Department website, In an average year, groundwater meets about 60% of Lake County’s urban and agricultural demands. Urban water demand in Lake County is estimated at 11,000 AFY and agricultural water demand is estimated at 40,000 AFY. More detailed information related to water usage demands in Lake County is included in the 2006 Lake County Water Demand Forecast.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 6
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 7
3.0 STORMWATER RESOURCES PLAN COMPONENTS
3.1 LOCAL WATER SUPPLY AUGMENTATION (10562-D1)
In Lake County, there are opportunities for local water supply augmentation through groundwater recharge in Big Valley. The area's groundwater management plan focuses on replenishing the aquifer using techniques like infiltration from local creeks and managed aquifer recharge. These efforts aim to enhance water supply resilience, mitigate the effects of drought, and protect natural water resources.
3.2 POLLUTION AND STORMWATER RUNOFF REDUCTION (10562-D2) The Largest urban areas within Lake County include The City of Lakeport and the City of Clearlake.
These cities as well as Lake County are part of the local Municipal Separate Storm Sewer (MS4) program, which aims to manage and reduce stormwater pollution. A map of the Lake County MS4 boundary is presented in Figure 3.1. Areas shown in red are considered urban and other areas are non-urban.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 8
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 9
3.2.1 Reducing Urban Stormwater Runoff
Urban stormwater is rainwater that flows over surfaces in impervious urban areas rather than being absorbed into the ground. This water collects and flows into stormwater channels and further downstream to surface water bodies. In Lake County, much of the urban stormwater runoff ultimately is transported into Clear Lake. The existence of impervious surfaces increases the volume and speed of runoff, which can contribute to localized flooding issues.
Reducing urban stormwater runoff involves a combination of strategies aimed at increasing water infiltration, reducing impervious surfaces, and managing runoff before it enters water bodies.
Managing runoff can include any of the following actions:
• Slowing down the flow of runoff through detention or retention • Development, maintenance, and improvement of stormwater conveyance systems to reduce flooding
Most infiltration, conveyance, detention, and retention systems (stormwater runoff management systems) are implemented when urban infrastructure is initially constructed. Strategic city planning and standards are necessary to guide this urban development. Stormwater runoff management systems can also be improved upon post-development.
3.2.2 Reducing Urban Stormwater Pollution
Urban stormwater pollution occurs when the stormwater runoff flowing over impervious surfaces in urban areas picks up pollutants and carries them into local water bodies such as Clear Lake and other surface waters. Urban stormwater pollution is related to urban stormwater runoff. An increase in stormwater volume or a decrease in transportation time can increase the mass of pollutants that are transported. The EPA “Nonpoint Source: Urban Areas” webpage defines the following categories of urban pollutants that apply to Lake County:
• Sediment
• Oil, grease, and other toxic motor vehicle chemicals
• Pesticides and nutrients from lawns and gardens
• Viruses, bacteria, and nutrients from pet waste and failing septic systems • Heavy metals from roof shingles, motor vehicles, and other sources Urban stormwater pollutants can be reduced and mitigated by:
• Leveraging Best Management Practices (BMPs) to filter and absorb pollutants • Public education and outreach for proper disposal and use of various chemicals • Improving the management of stormwater runoff as described in Section 3.2.2 of this plan
3.2.3 Reducing Non-Urban Runoff Pollution
Practices for reducing non-urban runoff pollution are described in-depth in the 2025 Lake County 319 Watershed Plan. Please refer to this plan for relevant information.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 10
3.3 RE-ESTABLISHMENT OF NATURAL TREATMENT AND INFILTRATION (10562- D3)
The 2025 Lake County 319 Watershed Plan Section 2.0 includes a review of “Wetland and Vegetative Filtration Loss” in Lake County and its detrimental effects on water quality. This section of the report also includes a list of typical mitigation BMPs. Sections 6.6 and 6.7 of the Plan outline recommended capital projects aimed at reducing the effects of wetland and vegetation loss. Section 7.2 of the report includes a roadmap for continuing to identify and prioritize related capital improvement projects in Lake County.
3.4 RESTORATION OF OPEN SPACE AND HABITAT (10562-D4)
“Re-Establishment of Natural Treatment and Infiltration” and “Restoration of Open Space and Habitat” are addressed in the same sections of the 2025 Lake County 319 Watershed Plan. Please refer to Section 3.3 of this Lake County Stormwater Resources Plan for a review of applicable references.
3.5 PUBLIC LANDS IN LAKE COUNTY (10562-D5)
The California Water Code Section 10560 emphasizes the use of public lands for stormwater resource projects. A stormwater resources plan must include, “[o]pportunities to use existing publicly owned lands and easements, including but not limited to, parks, public open space, community gardens, farm and agricultural preserves, schools sites, and government office buildings and complexes to capture, clean, store, and use stormwater and dry weather runoff either onsite or offsite”.
Several types of public lands in Lake County may be considered for stormwater resource projects.
Lake County public lands include BLM-managed areas, USFS-managed areas, City and County Public Lands, and State Public Lands. A map of public lands is presented in Figure 3.2.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 11
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 12
3.6 BMPS FOR STORMWATER MANAGEMENT (10562-D6)
In Lake County, new development and significant redevelopment projects are required to comply with local and state stormwater guidelines. Where these projects exceed one acre, a “General Permit” issued through the California SWRCB is required. The general permit requires a storm water pollution prevention plan to be prepared for each construction project. Contractors must implement various construction BMPs as described in the California Stormwater Quality Association (CASQA) BMP manual. Runoff calculations are prepared using the criteria and methodology outlined in the “Lake County Hydrology Design Standards” manual. Additional guidance for meeting stormwater quality construction objectives for Lake County Construction projects is outlined in the Bay Area Stormwater Management Agencies Association “Design Guidance Manual for Stormwater Quality Protection” (Design Guidance Manual).
The Design Guidance Manual emphasizes a “start at the source” approach. The design concepts are intended to address pollutants at their source and minimize the volume of stormwater runoff. This manual outlines the following types of BMPs:
• Impermeable Surface Reduction
Permeable pavements are encouraged by allowing for a reduced overland flow “c-factor” which results in a lower runoff volume calculation and a lower treatment requirement. • Onsite Stormwater Storage
The use of detention and retention basins are encouraged in this manual with a reduction in stormwater runoff volume, and a related reduction in stormwater treatment needs. • Low-Impact Development
Self-treating areas are a component of Low-Impact Development. Self-treating design techniques outlined in the Design Guidance Manual include “conserved natural spaces, large landscaped areas, grass/vegetative swales, and turf block paving areas”.
Stormwater Capture and Reuse
In 2014, the State of California passed the Sustainable Groundwater Management Act (SGMA). This act was intended to provide a framework for local agencies to manage depleting groundwater basins in a sustainable manner. The Big Valley groundwater basin has been identified by the State of California as a “medium” priority groundwater basin in Bulletin 118 (most recently published in November 2021). The Big Valley Groundwater Sustainability Agency (GSA) was formed in response to the Bulletin 118 classification of Big Valley. This agency prepared the “Big Valley Groundwater Sustainability Plan” (Big Valley GSP) to provide a method of attaining the SGMA sustainability goals.
The Big Valley GSP includes both projects and management actions aimed to achieve sustainability in the Big Valley basin. These projects and management actions are ranked in the GSP using a “Tier” 1-3 approach. Those ranked Tier 1 are backed with a commitment by the GSA to implement. Those projects in Tiers 2 and 3 are less developed and are not prioritized in the same way as Tier 1. Tier 2 recommended projects include the following:
• Implement Adobe Creek Conjunctive Use Project
• Rehabilitate Kelsey Creek Detention Structure
• Improve Water Demand Estimates
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 13
• Investigate Recharge Locations and Benefits
• Investigate Stormwater Capture for In Lieu Use
• Conduct Video Survey of RMS Wells
The Big Valley GSP also recommends developing an aerial electromagnetic study to better understand the extents of the Big Valley Aquifer. The aerial electromagnetic study and the other relevant proposed groundwater capital projects are included in this Stormwater Resources Plan Section 4.0 as potential stormwater resources capital projects.
3.7 ACTIVITIES THAT POLLUTE OR IMPAIR STORMWATER (10562-D7) The 2023 Clear Lake Watershed Sanitary Survey identifies several activities that pollute or impair stormwater, including erosion of natural soils, agriculture, timber and forestry, septic systems, urban runoff, and urban wastewater. These activities contribute to water quality degradation by introducing pollutants such as sediments, nutrients, and chemicals into the watershed. The survey emphasizes the need for improved management practices to mitigate these impacts and protect the water quality of Clear Lake.
The 2025 Lake County 319 Watershed Plan includes a more in-depth review of the pollution categories that were initially identified in the Sanitary Survey. The pollution categories are further refined as; “Wetland and Vegetative Filtration Loss”, “Hydromodification and Sediment Transport”, “Roadway Runoff”, and “Septage in Runoff”. The report contains background information related to each pollution category as well as typical BMPs. The report also includes recommendations for preparing subsequent planning studies to evaluate each pollution source further and develop actionable projects. One initial capital project has also been developed for each pollution category.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 14
4.0 STORMWATER RESOURCE PROJECT DATABASE
The County of Lake Watershed Protection District issued a public call for stormwater resources projects to include in this Stormwater Resources Plan. A total of 17 potential projects were submitted by various public agencies in Lake County. Those projects are illustrated geographically in Figure
4.1. A narrative description of each project follows.
Table 4.1- Stormwater Resource Project Database Overview Project
No Project Title Project Phase Grant Request $ /
Est. Project Cost Submitting Agency
1 Highland Creek Dam Conjunctive Use
Feasibility Study Update and Implementation Planning $700K County of Lake Watershed Protection 2 Adobe Reservoir Surface and Groundwater
Storage and Flow Enhancement Feasibility Planning $335K County of Lake Watershed Protection 3 Kelsey Creek Detention Structure
Rehabilitation Planning Planning $220K County of Lake Watershed Protection 4 Fire Supression Stormwater Capture Planning $85K County of Lake 5A City of Lakeport Forbes Creek Storm Drainage
Master Plan Planning $250K
5B Forbes Creek Offline Detention Basin Implementation $10.2M 5C Starr and Martin St Storm Drain Implementation $7.2M 5D Willow Point Bank Reinforcement Implementation $4.7M 5E Localized Pipe Improvements Implementation $1.0M
5F Seven North Tributary Culvert Improvements Implementation $0.8M 5G Martin Street Wetland Detention Basin Implementation $0.6M 5H
Reinforcement Implementation $0.3M
6 County-Wide Flood Modeling Project Planning $200K County of Lake 7 Cole Creek Stream Restoration Project Planning/ Design $180K County of Lake Watershed Protection
8 Scott's Valley Drainage Improvement Study Planning $220K County of Lake Special Districts
9 Highway 20 Vegetated Drainage Conveyance
Improvements Design $45K Redbud Audubon Society/
10 Burns Valley Sports Complex Detention Basin Implementation City of Clearlake 11 Miller Creek Restoration Project Design/
Implementation
$20K- Design
$180K- Const. City of Clearlake
12 Burns Valley Creek Restoration Design/
Construction
$25K- Design
$250K- Const.
13 Seasonal Creek Flood and Erosion
Management
Design/
Construction
$35K- Design
$250K- City of Clearlake
15 AEM Survey of Lake County Groundwater
Basins Planning $350K
County of Lake
Watershed Protection
16 Scott's Valley Aquifer Condition and Storage
Potential Study Planning $125K
County of Lake
Watershed Protection
17 Upper Lake Flood Risk Reduction (Preferred
Alternative) Implementation County of Lake Watershed Protection City of Lakeport
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 15
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 16
NO. 1- HIGHLAND CREEK DAM CONJUNCTIVE USE FEASIBILITY STUDY Project Description
This proposed project would consist of an update to the conjunctive use project plan that would evaluate modifying the Highland Dam in structure and operation to provide additional water storage for flow augmentation downstream when needed for hitch spawning, hatch, and migration.
The project will focus on conjunctive use planning, preliminary design, and permitting that supports the improved operation of Highland Spring Reservoir, which is a “medium priority” action item in the Big Valley Groundwater Basin approved Groundwater Sustainability Plan. The project will review the conjunctive use assessment from 2002 (“The Adobe Creek Conjunctive Use Feasibility Study - 2002”) that will include updated planning and designs for the infrastructure at Highland Springs Dam (i.e. gates and spillways) and release operation guidance for the Highland Spring Reservoir on Highland Creek which tributes to Adobe Creek.
Water Quality Analysis
This proposed project would have a limited impact on downstream water quality Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and
Infiltration
This proposed plan would support future groundwater
recharge and infiltration in the Big Valley Aquifer by leveraging the Highland Creek Reservoir for conjunctive use.
Interflow Interflow would ultimately be affected when conjunctive use is implemented.
Stormwater Capture and Use Analysis
This proposed project would support optimizing operation of the Highland Creek Dam to leverage stormwater for groundwater recharge and downstream flow augmentation.
Water Supply and Flood Control Analysis
This proposed planning project would support an increase the total water supply in the Big Valley Aquifer. This proposed planning project may also provide flood control benefits by regulating the flow downstream of the dam.
Environmental and Community Benefits Analysis
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The proposed project would enhance the Big
Valley Aquifer storage.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 17
NO. 2- ADOBE RESERVOIR SURFACE AND GROUNDWATER STORAGE AND FLOW
ENHANCEMENT FEASIBILITY STUDY
Project Description
The purpose of this proposed project is to determine the viability of a modifying the Adobe Creek reservoir (in structure, size, and operation) to determine whether its storage capacity and operation can be augmented to increase and enhance:
• Surface Water Storage of Adobe Reservoir
• Groundwater storage and recharge
• Environmental stream flow downstream to Adobe Creek to maintain flows sufficient for mid to late season Clear Lake Hitch spawning and hatch
Water Quality Analysis
This proposed project would have a limited impact on downstream water quality Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration This proposed plan would support future groundwater recharge and infiltration in the Big
Valley Aquifer by leveraging the Adobe Creek
Reservoir for conjunctive use.
Interflow Interflow would ultimately be affected when
conjunctive use is implemented.
Stormwater Capture and Use Analysis
This proposed project would support optimizing operation of the Adobe Creek Dam to leverage stormwater for groundwater recharge and downstream flow augmentation.
Water Supply and Flood Control Analysis
This proposed planning project would support an increase the total water supply in the Big Valley Aquifer. This proposed planning project may also provide flood control benefits by regulating the flow downstream of the dam.
Environmental and Community Benefits Analysis
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The proposed project would enhance the Big
Valley Aquifer storage.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 18
NO. 3- KELSEY CREEK DETENTION STRUCTURE REHABILITATION PLANNING Project Description
The Rehabilitation of the Kelsey Creek Detention Structure (KCD Structure) involves repair and replacement as it relates to the middle gate structure. KCD structure has been in operation since 1992. When operating the KCD Structure as designed, improve the natural form and functions of the creek which will benefit the riparian habitat, which plays a crucial role in the spawning habitat of the Clear Lake hitch. Additionally, this project will fund the installation of several stream flow telemetry gages above and downstream to provide valuable water flow and water saturation information to build out the knowledge needed to better understand and monitor the groundwater and surface water interactions on Kelsey Creek.
The purpose of the KCD Structure is to retain water for groundwater recharge which additionally will support downstream flows for migrating hitch and associated habitat. This project will ensure the continued proper operation of the KCD detention structure and the data collection tools needed to monitor that the structure if operation properly and as intended. The KCD Structure is a key piece of surface and groundwater management infrastructure that provides essential water for multi-use in a Severely Disadvantaged Community, a major agriculture center for the County, and a region that has suffered from water scarcity and drought impacts.
This project will support the recruitment of specialized contractor(s) to repair and maintain the detection structure and to install and calibrate the stream gages and verify the data upload and management of the produced data. All data collected during this project will be shared to a publicly accessible state data warehouse.
Outreach with the surrounding community will be included in this project in the form of project updates via in-person or virtual webinars and the production and distribution of digital and hard copy factsheets / infographics. Signage may also be needed and included in the outreach budget.
Water Quality Analysis
This proposed project would have a limited impact on downstream water quality.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration This project would promote groundwater recharge and infiltration by optimizing the use of
the Kelsey Creek Detention Structure.
Stormwater Capture and Use Analysis
This proposed project would support optimizing operation of the Adobe Creek Dam to leverage stormwater for groundwater recharge and downstream flow augmentation.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 19
Water Supply and Flood Control Analysis
This proposed capital project would support an increase the total water supply in the Big Valley Aquifer through the use of groundwater recharge. This proposed planning project may also provide flood control benefits by regulating the flow downstream of the detention structure.
NO. 4- FIRE SUPRESSION STORMWATER CAPTURE
Project Description
This proposed project would include the development of a plan to make stormwater available for use in fire suppression efforts in an environment with high fire risk. The project includes first identifying areas where water for fire suppression is minimal or nonexistent, then planning for stormwater capture, filtration and storage. With implementation of meter.me technology, real-time water capacity information can be accessed by fire fighters.
Water Quality Analysis
Water quality is not largely affected by this project.
Parameter Project Impact Description
Overland Flow Overland stormwater flow would be collected and made available for fire suppression efforts.
Stormwater Capture and Use Analysis
This project would capture stormwater for use in fire suppression efforts by implementing a filtration and storage system in areas where fire control water availability is limited or non-existent.
Water Supply and Flood Control Analysis
This project would develop a supply of reclaimed stormwater for fire suppression use.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of property damage due to fire.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat
Protection
Habitat protection would be encouraged through the
improvement of firefighting resources, reducing fire severity when it does happen and improving habitat resiliency.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 20
NO. 5A- CITY OF LAKEPORT FORBES CREEK STORM DRAINAGE MASTER PLAN
IMPLEMENTATION
Project Description
This project, proposed by the City of Lakeport, aims to plan necessary improvements to the Forbes Creek drainage basin near Lakeport, CA. The project includes improvements to existing infrastructure, wetlands restoration, and increasing storm drainage capacity. The project has an estimated cost of $250k.
Water Quality Analysis
Water quality would be improved through the creation of wetlands and drainage management.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing floodwaters.
Interflow -
Evapotranspiration Evapotranspiration would be improved through development of wetlands.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation Biological and chemical contamination risk of watershed would be reduced through flood
control.
Stormwater Capture and Use Analysis
The proposed project includes maximizing stormwater drainage.
Water Supply and Flood Control Analysis
Floodwaters would be controlled through necessary infrastructure improvements. Water quality would be improved through reduced runoff.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 21
Environmental and Community Benefits Analysis
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the development of wetlands and reduction of
erosion due to floodwater.
Increased Urban Green Space Urban green space would be increased through infrastructure improvements and
wetland development.
Public Use Area Enhancement Improvements to roads would increase public use.
Reduced Energy Use -
NO. 5B- CITY OF LAKEPORT FORBES CREEK OFFLINE DETENTION BASIN Project Description
This project, proposed by the City of Lakeport, aims to create an offline detention basin to reduce flood risks associated with high water levels in Forbes Creek. The project has an estimated cost of $10.2M.
Water Quality Analysis
Water quality would be improved through the creation of wetlands and drainage management.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing of
floodwaters.
Interflow -
Evapotranspiration Evapotranspiration would be improved through development of wetlands.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of watershed would be reduced through
flood control.
Stormwater Capture and Use Analysis
The proposed project includes maximizing stormwater drainage.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 22
Water Supply and Flood Control Analysis
Floodwaters would be controlled through necessary infrastructure improvements. Water quality would be improved through reduced runoff.
Environmental and Community Benefits Analysis
The environment and community would benefit from increased urban green space from wetland restoration and reduced flood risk.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat
Protection
The environment would be enhanced through the
development of wetlands and reduction of erosion due to floodwater.
Increased Urban Green Space Urban green space would be increased through infrastructure improvements and wetland development.
Public Use Area Enhancement -
Reduced Energy Use -
NO. 5C- CITY OF LAKEPORT STARR AND MARTIN ST. STORM DRAIN
IMPROVEMENTS
Project Description
This project, proposed by the City of Lakeport, aims to plan necessary improvements to the Forbes Creek drainage basin near Lakeport, CA. The project aims to increase storm drainage capacity to address flooding. The project has an estimated cost of $7.2M.
Water Quality Analysis
Water quality is improved through the creation of wetlands and drainage management.
Parameter Project Impact Description
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing floodwaters.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of the watershed would be reduced
through flood control.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 23
Stormwater Capture and Use Analysis
The project includes maximizing stormwater drainage efficiency.
Water Supply and Flood Control Analysis
The floodwaters would be controlled through necessary infrastructure improvements. Water quality would be improved through reduced runoff.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the reduction of erosion due to floodwater.
NO. 5D- CITY OF LAKEPORT WILLOW POINT BANK REINFORCEMENT Project Description
This project, proposed by the City of Lakeport, aims to plan necessary improvements to the Forbes Creek drainage basin near Lakeport, CA. The project includes reinforcing failing bank structures near Willow Point Bridge and addressing critical structural deficiencies. The project has an estimated cost of $4.7M.
Water Quality Analysis
Water quality would be improved through the reduction of erosion.
Parameter Project Impact Description
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The risk of biological and chemical contamination of the watershed would be
reduced through flood control.
Stormwater Capture and Use Analysis
The proposed project includes maximizing stormwater drainage.
Water Supply and Flood Control Analysis
Floodwaters would be controlled through necessary infrastructure improvements. Water quality would be improved through reduced runoff.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 24
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the reduction of erosion due to floodwater.
Increased Urban Green Space -
Public Use Area Enhancement -
Reduced Energy Use -
NO. 5E- CITY OF LAKEPORT LOCALIZED PIPE IMPROVEMENTS
Project Description
This project, proposed by the City of Lakeport, targets small-scale pipe deficiencies to mitigate localized flooding issues throughout the Forbes Creek and surrounding neighborhoods. The project has an estimated cost of $1M.
Water Quality Analysis
Water quality would be improved through drainage management.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing of
floodwaters.
Interflow -
Evapotranspiration -
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of the watershed would be reduced
through flood control.
Stormwater Capture and Use Analysis
The project would include maximizing stormwater drainage.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 25
Water Supply and Flood Control Analysis
Floodwaters would be managed through necessary infrastructure improvements.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the reduction of erosion due to floodwater.
Public Use Area Enhancement Improvements to roads would increase public use.
NO. 5F- CITY OF LAKEPORT SEVEN NORTH TRIBUTARY CULVERT IMPROVEMENTS Project Description
This project, proposed by the City of Lakeport, aims to plan necessary improvements to the Forbes Creek drainage basin near Lakeport, CA. The project includes the enhancement of capacity of culverts along the North Tributary to address frequent flooding issues. The project has an estimated cost of $0.8M.
Water Quality Analysis
Water quality would be improved through drainage management.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing of
floodwaters.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of the watershed would be reduced
through flood control.
Stormwater Capture and Use Analysis
The proposed project includes maximizing stormwater drainage.
Water Supply and Flood Control Analysis
Floodwaters would be controlled through necessary infrastructure improvements.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 26
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat Protection
The environment would be enhanced through the
reduction of erosion due to floodwater and culvert
restoration.
Increased Urban Green Space Urban green space would be increased through infrastructure improvements and wetland development.
NO. 5G- CITY OF LAKEPORT MARTIN STREET WETLAND DETENTION BASIN This project, proposed by the City of Lakeport, aims to plan necessary improvements to the Forbes Creek drainage basin near Lakeport, CA. The project includes construction of a wetland detention basin to manage stormwater runoff and enhance flood control. The project has an estimated cost of $0.6M.
Water Quality Analysis
Water quality is improved through the creation of wetlands and drainage management.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing of
floodwaters.
Interflow -
Evapotranspiration Evapotranspiration would be improved through development of wetlands.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of watershed would be reduced through
flood control.
Stormwater Capture and Use Analysis
The project includes maximizing stormwater drainage.
Water Supply and Flood Control Analysis
Floodwaters would be controlled through necessary infrastructure improvements.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 27
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the development of wetlands and reduction of
erosion due to floodwater.
Increased Urban Green Space Urban green space would be increased through infrastructure improvements and
wetland development.
NO. 5H- CITY OF LAKEPORT BRUSH AND ARMSTRONG ST. BANK
REINFORCEMENTS
This project, proposed by the City of Lakeport, aims to plan necessary improvements to the Forbes Creek drainage basin near Lakeport, CA. The project focuses on repairing failing retaining walls along Forbes Creek in critical locations to improve structural integrity. The project has an estimated cost of $0.3M.
Water Quality Analysis
Water quality would be improved through the creation of wetlands and drainage management.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing of
floodwaters.
Interflow -
Evapotranspiration Evapotranspiration would be improved through development of wetlands.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of the watershed would be reduced
through flood control.
Stormwater Capture and Use Analysis
The proposed project would include maximizing stormwater drainage.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 28
Water Supply and Flood Control Analysis
Floodwaters would be controlled through necessary infrastructure improvements.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the reduction of erosion due to floodwater.
Increased Urban Green Space Urban green space would be increased through infrastructure improvements and
wetland development.
NO. 6- COUNTY-WIDE FLOOD MODELING PROJECT
Project Description
The County of Lake is seeking funding for scenario modeling for ARkStorm 2.0. Because atmospheric river storms are the norm, and extensive flooding has happened before, the County needs a model for this scenario for planning purposes. The project has an estimated cost of $200k.
Water Quality Analysis
Water quality would be improved through informed management of stormwater.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge and infiltration would be improved through capturing of
floodwaters.
Evapotranspiration Evapotranspiration would be improved through development of wetlands.
Delivery of Sediment to Receiving Waters Sediment delivery would be reduced with flood control.
Delivery of Organic Matter to Receiving Waters Organic matter delivery would be reduced with flood control.
Chemical and Biological Transformation The biological and chemical contamination risk of the watershed would be reduced
through flood control.
Stormwater Capture and Use Analysis
Stormwater capture would be improved through informed management decisions.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 29
Water Supply and Flood Control Analysis
Flood control would be improved through informed management decisions.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
NO. 7- COLE CREEK STREAM RESTORATION PROJECT
Project Description
Project funds are needed to initiate planning, engineering and hydrological designs for a stream restoration project for 1.55 miles in Cole Creek, in Lake County, CA Cole Creek is a preferred spawning tributary of Clear Lake for the endemic state-listed Clear Lake Hitch minnow. channel bed loss and subsequent localized flooding. Therefore, funding is needed for the LCWPD to lead the development of a restoration plan for Cole Creek to improve spawning habitat for the Clear Lake Hitch. Restoration plans would include resources and support for local partners to coordinate with experienced engineers to conduct a hydrological study of the impacted Cole Creek system to best inform the creation of a 60-90% design for sediment removal, creek bed recreation, stream bank stabilization, and storm water flow connectivity improvements, to prevent future flood and storm conditions to degrade the restored tributary. Additional funds would be needed to conduct local community outreach and water right or permitting augmentation. The project goal is to develop an appropriate and permitted project plan and design, with community and partner buy-in, which is ready to be funded for implementation and construction.
Figure 4.2- Flooding Near Cole Creek
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 30
Water Quality Analysis
Water quality would be improved through the restoration of the Cole Creek system and improved drainage infrastructure prevents contamination and erosion.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge would be improved through flood control and restoration of creek
beds.
Interflow -
Evapotranspiration Evapotranspiration would be improved through restoration of creek bed.
Delivery of Sediment to Receiving Waters Sediment delivery to receiving waters would be reduced through improved drainage
infrastructure.
Delivery of Organic Matter to Receiving
Waters
Organic matter delivery would be reduced
through improved drainage infrastructure.
Chemical and Biological Transformation The biological and chemical contamination risk of the watershed would be reduced through
flood control and restoration of creek bed.
Stormwater Capture and Use Analysis
This proposed project reduces flood severity and manages stormwater impact.
Water Supply and Flood Control Analysis
Flood control would be improved through informed management decisions, and water supply contamination is reduced through restoration of creek bed and infrastructure improvements.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding. The proposed environmental restoration improves urban green space.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
Reduction of localized flooding would improve
water quality. The environment would be
enhanced through restoration of the creek bed
protecting the spawning grounds of native fish.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 31
Increased Urban Green Space Urban green space would be increased through the restoration of creek bed and
access improvements.
Public Use Area Enhancement The creek is made more accessible for public use.
NO. 8- SCOTTS VALLEY DRAINAGE IMPROVEMENT STUDY
Project Description
The Clean Water Program and Special Districts have proposed this project to improve the drainage of the Scotts Valley to prevent flooding. The project includes levee repair, floodplain restoration, and creek clearing. The project has an estimated cost of $220k.
Water Quality Analysis
Water quality would be enhanced through a reduction in contamination and runoff entering the water supply during flood events.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and Infiltration Groundwater recharge would be encouraged by improving flood control.
Evapotranspiration The restoration of the floodplain would improve evapotranspiration.
Delivery of Sediment to Receiving
Waters
Sediment delivery would be reduced by restoration and
implementing flood control.
Delivery of Organic Matter to
Receiving Waters
Delivery of organic matter would be reduced by
implementing erosion control.
Chemical and Biological
Transformation
Biological transformation would be encouraged by
improving wetland and riparian habitat and reducing
erosion.
Stormwater Capture and Use Analysis
Stormwater drainage would be improved through flood control.
Water Supply and Flood Control Analysis
Flood control would be improved with infrastructure improvements.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 32
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding and increased urban green space.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
The environment would be enhanced through
the development of wetlands and the reduction
of erosion due to floodwater.
Increased Urban Green Space Urban green space would be increased through infrastructure improvements and
floodplain restoration.
NO. 9- HIGHWAY 20 VEGETATED DRAINAGE CONVEYANCE IMPROVEMENTS Project Description
This proposed project includes the design of improvements to the vineyard drainage along Highway
20. Runoff from the vineyards flows into the culvert running parallel with Highway 20, then flows under the road in front of the Shannon Wetland 86 acres. Water then flows directly into the east channel between the parcels and homes in the Clearlake Oaks Keys addition and directly into the lake. There is a high rate of flow with a large mass of debris and high turbidity. Major improvements are needed to improve water quality. This proposed project could potentially include a partnership with USDA NRCS agricultural runoff mitigation grant funds.
Water Quality Analysis
Water quality would be improved through the reduction of chemical and biological runoff entering Clear Lake from vineyards and urban byproducts.
Parameter Project Impact Description
Overland Flow Contamination of overland flow would be
reduced.
Groundwater Recharge and Infiltration Contamination of groundwater would be reduced.
Delivery of Sediment to Receiving Waters Delivery of sediment would be reduced.
Delivery of Organic Matter to Receiving
Waters
Delivery of organic matter to Clear Lake would be
reduced.
Chemical and Biological Transformation Chemical and biological contaminants would be reduced.
Stormwater Capture and Use Analysis
This project does not include a stormwater capture component.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 33
Water Supply and Flood Control Analysis
Water supply contamination would be reduced, and flood severity would be reduced.
Environmental and Community Benefits Analysis
The habitat in the project vicinity is improved and contamination is reduced for the waterways adjacent to the Clear Lake keys neighborhood, and drainage of agricultural land is improved.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat
Protection
Water quality would be enhanced through the restoration of wetland habitat and the reduction of contaminants in water supply.
Increased Urban Green Space Urban green space would be improved through the reduction of contaminants and restoration of wetlands.
NO. 10- BURNS VALLEY SPORTS COMPLEX DETENTION BASIN
Project Description
A 126,500 cubic foot detention basin is proposed to detain storm water originating from the proposed Burns Valley Sports Complex Site. The proposed Burns Valley Sports Complex is a 20- acre development that will provide the community with one full size baseball field, two smaller little league baseball fields, one small Tee-Ball Field, a full-size soccer field, development of an approximately 15,000 square foot recreation center building for use for public events and activities (including sports features, such as basketball and volleyball courts).
Water Quality Analysis
The proposed Burns Valley Sports Complex Detention Basin would improve water quality.
Parameter Project Impact Description
Overland Flow Overland flow originating from the proposed impervious surfaces will be detained and treated in the proposed
detention basin.
Groundwater Recharge and
Infiltration
The detention basin will promote some component of
groundwater recharge.
Delivery of Sediment to
Receiving Waters
Sediment transport to receiving waters will be reduced by allowing turbid stormwater runoff to slow and deposit
sediment in the basin. Organic matter will also be detained in the basin. Delivery of Organic Matter to
Receiving Waters
Chemical and Biological
Transformation
A percentage of nutrients that would be otherwise transported to downstream waters will be biologically transformed by vegetation that is present in the detention basin.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 34
Stormwater Capture and Use Analysis
This proposed project as currently defined does not include a stormwater use component. Based on the nature of funding sources that are available to support the project, the project could be potentially be modified to include a stormwater “retention” basin that would store water year-round and serve a recreational and fire-fighting purpose. The retention basin could also provide a source of reclaimed irrigation water for the proposed park.
Water Supply and Flood Control Analysis
This proposed project limits downstream flooding to some extent by slowing down the release of water downstream in a storm event.
Environmental and Community Benefits Analysis
This proposed project has a significant potential community benefit by supporting the development of a sports and recreational complex serving a low-income disadvantaged community.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
This proposed project would protect
downstream water bodies from any
constituents contained in stormwater runoff.
Increased Urban Green Space This proposed project would provide a net increase in urban green space within a
disadvantaged community.
Public Use Area Enhancement This proposed project would open-up additional opportunities for public use of
lands.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 35
NO. 11- MILLER CREEK RESTORATION PROJECT
Project Description
This project was proposed by the City of Clearlake. The project includes the improvement a 0.5 mile section of Miller Creek, which flows through a series of culverts and ultimately drains into Clear Lake.
This proposed project includes addressing historic drainage challenges and failing creek slopes.
The project also includes weed management, debris removal, and has a restoration component. The estimated project cost is $20K for design and $180K for implementation.
Figure 4.3- Miller Creek Stormwater Inlet and Invasive Thistle Vegetation Water Quality Analysis
This proposed project would enhance Clear Lake water quality by reducing suburban constituent transport and sediment uptake in the lower reach of Miller Creek.
Parameter Project Impact Description
Evapotranspiration Restoration of native vegetation would result in improved evapotranspiration.
Delivery of Sediment to Receiving Waters Delivery of sediment would be reduced by strengthening creek slopes that are eroding.
Chemical and Biological Transformation Biological transformation would be enhanced by encouraging the population of native
vegetative species.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 36
Stormwater Capture and Use Analysis
This proposed project does not include a stormwater capture component.
Water Supply and Flood Control Analysis
This proposed project would minimize local suburban flooding by providing adequately sized culverts and conducting drainage enhancements.
Environmental and Community Benefits Analysis
This project would enhance the environment by removing debris and restoring native vegetation.
This project includes improving urban green space and creek access.
Parameter Project Impact Description
Water Quality, Environmental Enhancement, or
Habitat Protection
Environmental enhancement is a component of
this project.
Increased Urban Green Space Urban green space would be improved.
Public Use Area Enhancement Public access to Miller Creek would be improved.
Reduced Energy Use -
NO. 12- BURNS VALLEY CREEK RESTORATION
Project Description
This project, proposed by the City of Clearlake, would include the repair of a deteriorating slope along Burns Valley Creek where a damaged rock retaining wall is compromising habitat and water quality. The estimated project cost is $25k for planning and $250k for construction and implementation.
Figure 4.4- Failed Retaining Wall Near Burns Valley Creek.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 37
Water Quality Analysis
The proposed project would improve water quality by removing debris and reducing erosion and runoff.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and
Infiltration
Groundwater recharge and infiltration would be improved by removing impermeable debris and improving creek bed
resiliency.
Delivery of Sediment to Receiving
Waters
Sediment delivery would be reduced by improving creek
bank resiliency and clearing debris.
Delivery of Organic Matter to
Receiving Waters
Delivery of organic matter would be minimized by
stabilizing slopes, reducing erosion and sediment runoff into Clearlake.
Chemical and Biological
Transformation
Biological transformation would be encouraged by
stabilizing slope and removing debris, improving riparian habitat quality.
Stormwater Capture and Use Analysis
This project does not include a stormwater capture component.
Water Supply and Flood Control Analysis
This project improves flood resiliency by stabilizing slopes along creek bed.
Environmental and Community Benefits Analysis
The community benefits from infrastructure improvements and minimized hydromodification.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat Protection
This project would improve habitat quality by removing
debris and stabilizing slopes.
Increased Urban Green Space This project would improve urban green space by removing debris from failing wall, minimizing
hydromodification
Public Use Area Enhancement Public use would be encouraged by the removal of hydromodification, and the habitat in the vicinity would be improved from stabilizing slopes.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 38
NO. 13-SEASONAL CREEK FLOOD AND EROSION CONTROL
Project Description
This project, proposed by the City of Clearlake, will implement flood control and restoration strategies. The project will reduce erosion risk for two creeks in Clearlake that seasonally flood, inundating roads and private properties. The project has an estimated cost of $35k for design and $250k for implementation.
Water Quality Analysis
This proposed project would improve water quality by implementing flood control, reducing runoff and sediment flow, and improving riparian habitat.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and
Infiltration
Groundwater recharge would be encouraged by improving flood control and restoring wetlands.
Evapotranspiration Restoration of the creek would improve evapotranspiration.
Delivery of Sediment to
Receiving Waters
Sediment delivery would be reduced by restoring the creek and implementing flood control.
Delivery of Organic Matter to
Receiving Waters
Delivery of organic matter would be reduced by implementing erosion control.
Chemical and Biological
Transformation
Biological transformation would be encouraged by improving wetland and riparian habitat and reducing erosion.
Stormwater Capture and Use Analysis
This project does not include a stormwater capture component.
Water Supply and Flood Control Analysis
This proposed project reduces flood risk of roadways and private property.
Environmental and Community Benefits Analysis
Habitat restoration improves environmental quality. The project benefits the community by reducing flood risk and enhancing riparian habitat.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat
Protection
Environment is enhanced by restoration riparian habitat. Water quality would be improved by implementing flood control and reducing runoff and sediment flow.
Increased Urban Green Space Urban green space would be improved from restoration of riparian habitat.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 39
NO. 15- AEM SURVEY OF LAKE COUNTY’S GROUNDWATER BASINS
Project Description
This proposed project will follow existing successes in using Airborne Electromagnetic surveying technology (AEM) to research Clear Lake’s groundwater availability. This information is crucial for ensuring sustainable growth and preparing for an uncertain climatic future. The project is proposed by the Lake County Watershed Protection District, and has an estimated cost of $300k.
Water Quality Analysis
This project will provide valuable data to assist in future planning and restoration efforts.
Parameter Project Impact Description
Overland Flow Overland flow would be better understood through the collection of groundwater data.
Groundwater
Recharge and
Infiltration
Recharge and infiltration would be better understood through the collection of groundwater data.
Interflow Interflow would be better understood through the collection of groundwater data.
Stormwater Capture and Use Analysis
This project does not include a stormwater capture component but will allow for a better understanding of stormwater percolation.
Water Supply and Flood Control Analysis
This project allows for the collection of valuable data on the location and size of the Clear Lake watershed’s groundwater supplies.
Environmental and Community Benefits Analysis
The community would benefit from informed management decisions.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 40
Figure 4.5- Planned Extent for AEM survey of the Clear Lake Basin Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 41
NO. 16- EVALUATION OF AQUIFER CONDITION AND STORAGE POTENTIAL IN
SCOTTS VALLEY
Project Description
This project, proposed by the County of Lake Watershed Protection District, will evaluate the local aquifer conditions and storage potential in Scotts Valley. Future development of groundwater supplies may be required to provide water security for the residents and farmers of Scotts Valley.
Securing groundwater resources will allow surface water to stay in Clear Lake, providing additional ecosystems services and improving the overall health of the system. The potential impacts of developing local groundwater resources will be assessed in regard to the aquifer system, streams, creeks, groundwater dependent ecosystems, current groundwater pumpers and inflows into Clear Lake. The project has an estimated cost of $125K.
Water Quality Analysis
This project will allow for a greater understanding of aquifer condition and storage potential, informing future management decisions that could impact water quality.
Parameter Project Impact Description
Overland Flow Overland flow would be better understood through the collection of groundwater data.
Groundwater Recharge
and Infiltration
Recharge and infiltration would be better understood through the collection of groundwater data.
Interflow Interflow would be better understood through the collection of groundwater data.
Stormwater Capture and Use Analysis
This project does not include a stormwater capture component, however, if implemented it will allow for a better understanding of stormwater percolation.
Water Supply and Flood Control Analysis
The project will result in a better understanding of Scott’s Valley water supply and aquifer conditions, informing management decisions.
Environmental and Community Benefits Analysis
The community would benefit from improved stormwater management.
Parameter Project Impact Description
Water Quality,
Environmental
Enhancement, or Habitat
Protection
Environment and water quality would be enhanced through a deeper understanding of aquifer conditions. Future management decisions would also be informed.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 42
NO. 17- UPPER CLEAR LAKE FLOOD RISK REDUCTION
Project Description
This project, proposed by the County of Lake Watershed Protection District, includes the implementation of planned flood management infrastructure. The Flood Risk Reduction Feasibility Study prepared by PBI on behalf of The County of Lake identifies a need to reduce flood risk to the community of Upper Lake. A total of 11 capital project alternatives are considered for flood risk management. The preferred project alternative has an estimated cost of $11M.
Water Quality Analysis
Water quality would be enhanced through a reduction in contamination and runoff entering the water supply during flood events.
Parameter Project Impact Description
Overland Flow -
Groundwater Recharge and
Infiltration
The project would improve groundwater recharge and
infiltration through flood management.
Delivery of Sediment to
Receiving Waters
Sediment delivery would be reduced by reducing flood
severity.
Delivery of Organic Matter to
Receiving Waters
Organic matter delivery would be reduced by reducing flood severity.
Chemical and Biological
Transformation
Biological and chemical pollutants would be reduced by
improved flood management.
Water Supply and Flood Control Analysis
This proposed project would reduce flood risk in Upper Lake.
Environmental and Community Benefits Analysis
The community would benefit from a reduced risk of flooding.
Parameter Project Impact Description
Water Quality, Environmental
Enhancement, or Habitat
Protection
Water quality and the environment would be enhanced
through reduced pollution.
Public Use Area Enhancement Private and public property damage from flooding would be reduced. This reduction in property damage would be a
significant community benefit.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 43
5.0 STORMWATER RESOURCE PROJECT RANKING
An integrated metrics-based analysis has been prepared in accordance with the 2015 SWRCB SWRP Guidelines. This report section uses quantifiable factors to rank the proposed projects that are included in the plan database. Table 5.1 illustrates the primary benefits that have been identified for each proposed project along with “multi-project benefits” as defined by the California SWRCB. For each project, a score has been calculated to reflect the percentage of multi-project benefits that are a part of the project. This score is illustrated in the white column on the far right of the table.
Table 5.2 illustrates the prioritizing criteria as identified on pages 29 and 30 of the 2015 SWRCB SWRP Guidelines as related to each project. The criteria listed in the table are used to calculate a “weighted average” score for each proposed project. The various projects are assigned a score between 0 and 100 for each category. If a component is not part of the project, the project is assigned a score of “0” for that component. If a component is a part of the project, the project is assigned a score of “100” for that component. Then the weighted average is calculated for each project using the criteria importance weight listed at the top of the table. The resulting weighted project score can be used to prioritize projects for future grant funding.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 44
Table 5.1- Primary Project Benefits and Multi-Project Benefits Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 45
Criteria
Local FundingMulti-Benefit ScorePublic Ownership of LandsLocal Water SuppliesWatershed EnhancementDAC BenefitRestoration of Green SpaceFlood ManagementWeighted Project Score 2 2 1 5 2 1 1 2 -
Project
No. Project Name
1 Highland Creek Dam Conjunctive Use Feasibility
Study Update and Implementation 0 23 100 100 100 100 0 100 72 2 Storage and Flow Enhancement Feasibility
Study 0 23 100 100 100 100 0 100 72
3 Kelsey Creek Detention Structure Rehabilitation 0 23 100 100 100 100 0 100 72 4 Fire Supression Stormwater Capture 0 23 100 100 100 100 0 100 72 5A City of Lakeport Forbes Creek Storm Drainage
Master Plan 0 69 100 100 100 100 100 100 84
5B Forbes Creek Offline Detention Basin 0 69 100 0 0 100 100 100 40 5C Starr and Martin St Storm Drain 0 31 100 0 100 100 0 100 41 5D Willow Point Bank Reinforcement 0 31 100 0 100 100 0 100 41 5E Localized Pipe Improvements 0 31 100 0 0 100 0 100 29 5F Seven North Tributary Culvert Improvements 0 31 100 0 100 100 0 100 41 5G Martin Street Wetland Detention Basin 0 85 100 0 100 100 100 100 54 5H Brush and Armstrong Street Bank
Reinforcement 0 31 100 0 100 100 0 100 41
6 County-Wide Flood Modeling Project 0 54 100 0 100 100 100 100 50 7 Cole Creek Stream Restoration Project 100 85 100 0 100 100 100 100 67 8 Scott's Valley Drainage Improvement Study 0 62 100 0 100 100 100 100 51 9 Highway 20 Vegetated Drainage Conveyance
Improvements 100 62 100 0 100 100 100 100 64
10 Burns Valley Sports Complex Detention Basin 100 85 100 100 0 100 100 100 86 11 Miller Creek Restoration Project 0 62 100 0 100 100 100 100 51 12 Burns Valley Creek Restoration 0 62 100 0 100 100 100 100 51 13 Seasonal Creek Flood and Erosion Management 0 54 100 0 100 100 100 100 50 15 AEM Survey of Lake County Groundwater Basins 100 31 100 100 100 100 0 100 85 16 Scott's Valley Aquifer Condition and Storage
Potential Study 0 31 100 100 100 100 0 100 73
17 Upper Lake Flood Risk Reduction (Preferred
Alternative) 0 54 100 100 0 100 0 100 63
Criteria Importance (1-5)
Table 5.2- Weighted Project Score Derivation
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 46
ATTACHMENT A- CA WATER CODE SECTION 10560
This text has been reproduced from California Code, WAT 10561 as accessed January 15th, 2025.
CA Water Code Section 10560
This part shall be known and may be cited as “The Stormwater Resource Planning Act.” CA Water Code Section 10561
The Legislature hereby finds and declares all of the following:
(a) In many parts of the state stormwater and dry weather runoff are underutilized sources of surface water and groundwater supplies. Instead of being viewed as a resource, they are often seen as a problem that must be moved to the ocean as quickly as possible or as a source of contamination, contributing to a loss of usable water supplies and the pollution and impairment of rivers, lakes, streams, and coastal waters. (b) Improved management of stormwater and dry weather runoff, including capture, treatment, and reuse by using the natural functions of soils and plants, can improve water quality, reduce localized flooding, and increase water supplies for beneficial uses and the environment.
(c) Most of California’s current stormwater drainage systems are designed to capture and convey water away from people and property rather than capturing that water for beneficial uses.
(d) Historical patterns of precipitation are predicted to change and an increasing amount of California’s water is predicted to fall not as snow in the mountains, but as rain in other areas of the state. This will likely have a profound and transforming effect on California’s hydrologic cycle and much of that water will no longer be captured by California’s reservoirs, many of which are located to capture snow melt.
(e) When properly designed and managed, the capture and use of stormwater and dry weather runoff can contribute significantly to local water supplies through onsite storage and use, or letting it infiltrate into the ground to recharge groundwater, either onsite or at regional facilities, thereby increasing available supplies of drinking water. (f) New developments and redevelopments should be designed to be consistent with lowimpact development principles to improve the retention, use, and infiltration of stormwater and dry weather runoff onsite or at regional facilities. (g) Stormwater and dry weather runoff can be managed to achieve environmental and societal benefits such as wetland creation and restoration, riverside habitats, instream flows, and an increase in park and recreation lands, and urban green space. (h) Stormwater and dry weather runoff management through multiobjective projects can achieve additional benefits, including augmenting recreation opportunities for Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 47
communities, increased tree canopy, reduced urban heat island effect, and improved air quality.
(i) Proper planning and implementation is vital to ensure that the water supply and other benefits potentially available through better management of stormwater and dry weather runoff do not come at the expense of diminished water quality. (j) The capture and use of stormwater and dry weather runoff is not only one of the most costeffective sources of new water supplies, it is a supply that can often be provided using significantly less energy than other sources of new water supplies.
CA Water Code 10562
(a) One or more public agencies may develop a stormwater resource plan pursuant to this part. (b) A stormwater resource plan shall:
(1) Be developed on a watershed basis.
(2) Identify and prioritize stormwater and dry weather runoff capture projects for implementation in a quantitative manner, using a metrics-based and integrated evaluation and analysis of multiple benefits to maximize water supply, water quality, flood management, environmental, and other community benefits within the watershed. (3) Provide for multiple benefit project design to maximize water supply, water quality, and environmental and other community benefits.
(4) Provide for community participation in plan development and implementation. (5) Be consistent with, and assist in, compliance with total maximum daily load (TMDL) implementation plans and applicable national pollutant discharge elimination system (NPDES) permits.
(6) Be consistent with all applicable waste discharge permits. (7) Upon development, be submitted to any applicable integrated regional water management group. Upon receipt, the integrated regional water management group shall incorporate the stormwater resource plan into its integrated regional water management plan.
(8) Prioritize the use of lands or easements in public ownership for stormwater and dry weather runoff projects.
(c) The proposed or adopted plan shall meet the standards outlined in this section. The plan need not be referred to as a “stormwater resource plan.” Existing planning documents may be utilized as a functionally equivalent plan, including, but not limited to, watershed management plans, integrated resource plans, urban water management plans, or similar plans. If a planning document does not meet the standards of this section, a collection of local and regional plans may constitute a functional equivalent, if the plans collectively meet all of the requirements of this part.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 48
(d) An entity developing a stormwater resource plan shall identify in the plan all of the following:
(1) Opportunities to augment local water supply through groundwater recharge or storage for beneficial use of stormwater and dry weather runoff. (2) Opportunities for source control for both pollution and stormwater and dry weather runoff volume, onsite and local infiltration, and use of stormwater and dry weather runoff. (3) Projects to reestablish natural water drainage treatment and infiltration systems, or mimic natural system functions to the maximum extent feasible. (4) Opportunities to develop, restore, or enhance habitat and open space through stormwater and dry weather runoff management, including wetlands, riverside habitats, parkways, and parks.
(5) Opportunities to use existing publicly owned lands and easements, including, but not limited to, parks, public open space, community gardens, farm and agricultural preserves, schoolsites, and government office buildings and complexes, to capture, clean, store, and use stormwater and dry weather runoff either onsite or offsite. (6) Design criteria and best management practices to prevent stormwater and dry weather runoff pollution and increase effective stormwater and dry weather runoff management for new and upgraded infrastructure and residential, commercial, industrial, and public development. These design criteria and best management practices shall accomplish all of the following:
(A) Reduce effective impermeability within a watershed by creating permeable surfaces and directing stormwater and dry weather runoff to permeable surfaces, retention basins, cisterns, and other storage for beneficial use. (B) Increase water storage for beneficial use through a variety of onsite storage techniques.
(C) Increase groundwater supplies through infiltration, where appropriate and feasible.
(D) Support low-impact development for new and upgraded infrastructure and development using low-impact techniques.
(7) Activities that generate or contribute to the pollution of stormwater or dry weather runoff, or that impair the effective beneficial use of stormwater or dry weather runoff. (8) Projects and programs to ensure the effective implementation of the stormwater resource plan pursuant to this part and achieve multiple benefits. These projects and programs shall include the development of appropriate decision support tools and the data necessary to use the decision support tools.
(9) Ordinances or other mechanisms necessary to ensure the effective implementation of the stormwater resource plan pursuant to this part.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 49
(e) A stormwater resource plan shall use measurable factors to identify, quantify, and prioritize potential stormwater and dry weather runoff capture projects.
CA Water Code 10563
(a) This part does not interfere with or prevent the exercise of authority by a public agency to carry out its programs, projects, or responsibilities.
(b) This part does not affect requirements imposed under any other law. (c)
(1) The development of a stormwater resource plan and compliance with this part in accordance with Section 10565 shall be required to receive grants for stormwater and dry weather runoff capture projects from a bond act approved by the voters after January 1, 2014.
(2) This subdivision does not apply to either of the following:
(A) Funds provided for the purpose of developing a stormwater resource plan. (B) A grant for a disadvantaged community, as defined in Section 79505.5, with a population of 20,000 or less, and that is not a copermittee for a municipal separate stormwater system national pollutant discharge elimination system (NPDES) permit issued to a municipality with a population greater than 20,000.
CA Water Code 10564
For purposes of this part, “low-impact development” means new development or redevelopment projects that employ natural and constructed features that reduce the rate of stormwater runoff, filter out pollutants, facilitate stormwater storage onsite, infiltrate stormwater into the ground to replenish groundwater supplies, or improve the quality of receiving groundwater and surface water.
CA Water Code 10565
By July 1, 2016, the board shall establish guidance for this part that shall include, but is not limited to, the following:
(a) Identifying types of local agencies and nongovernmental organizations that need to be consulted in developing a stormwater resource plan.
(b) Defining appropriate quantitative methods for identifying and prioritizing opportunities for stormwater and dry weather runoff capture projects. (c) Defining the appropriate geographic scale of watersheds for stormwater resource planning.
(d) Other guidance the board deems appropriate to achieve the objectives of this part.
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 50
ATTACHMENT B- REQUIRED STORMWATER RESOURCES
ELEMENTS
This document contains language from the California Water Code Section 10560 and corresponding sections of the December 2015 SWRCB Storm Water Resources Plan guidelines selfcertification checklist (Appendix A).
CA Water
Code
10560
Section
CA Water Code Section 10560
Requirement
Appendix A
Self
Certification
Checklist
Section
Appendix A Self Certification
Checklist Element
SWRP Section
Reference
10562-b1 Develop the plan on a watershed
basis
Watershed
Identification
Identify watersheds and sub
watersheds
Planning area
description refers
reader to applicable
sections of the Lake
County 319
Watershed Plan
10562-b2
Identify and prioritize stormwater and
dry weather runoff capture projects for
implementation in a quantitative
manner, using a metrics-based and
integrated evaluation and analysis of
multiple benefits to maximize water
supply, water quality, flood
management, environmental, and
other community benefits within the
watershed.
Identification
and
Prioritization of
Projects
Plan uses appropriate quantitative
methods for prioritization of projects.
(This should be accomplished by using
a metrics-based and integrated
evaluation and analysis of multiple
benefits to maximize water supply,
water quality, flood management,
environmental, and other community
benefits within the watershed.)
Stormwater resource
project database
includes project
ranking
10562-b3
Provide for multiple benefit project
design to maximize water supply,
water quality, and environmental and
other community benefits. -
10562-b4 Provide for community participation in
plan development and implementation.
Organization,
Coordination,
Collaboration
and Education,
Outreach,
Public
Participation
Community participation was provided
for in Plan development.
Call for projects to
include in the plan
10562-b5
Be consistent with, and assist in,
compliance with total maximum daily
load (TMDL) implementation plans
and applicable national pollutant
discharge elimination system
(NPDES) permits.
Water Quality
Compliance
Plan describes how it is consistent with
and assists in, compliance with total
maximum daily load implementation
plans and applicable national pollutant
discharge elimination system permits.
TMDL and NPDES
permits are described
in 319 plan. This plan
is consistent with
permit goals
10562-b6 Be consistent with all applicable waste
discharge permits.
Water Quality
Compliance
Plan identifies applicable permits and
describes how it meets all applicable
waste discharge permit requirements.
TMDL and NPDES
permits are described
in 319 plan. This plan
is consistent with
permit goals
10562-b7
Upon development, be submitted to
any applicable integrated regional
water management group. Upon
receipt, the integrated regional water
management group shall incorporate
the stormwater resource plan into its
Implementation
Strategy and
Schedule
Applicable IRWM plan: The Plan will be
submitted, upon development, to the
applicable integrated regional water
management (IRWM) group for
incorporation into the IRWM plan.
-
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 51
CA Water
Code
10560
Section
CA Water Code Section 10560
Requirement
Appendix A
Self
Certification
Checklist
Section
Appendix A Self Certification
Checklist Element
SWRP Section
Reference
integrated regional water management
plan.
10562-b8
Prioritize the use of lands or
easements in public ownership for
stormwater and dry weather runoff
projects.
Identification
and
Prioritization of
Projects
Plan identifies opportunities to use
existing publicly owned lands and
easements, including, but not limited to,
parks, public open space, community
gardens, farm and agricultural
preserves, school sites, and
government office buildings and
complexes, to capture, clean, store, and
use storm water and dry weather runoff
either onsite or offsite.
A description of public
land opportunities in
Lake County is
included in the report.
10562-c
The proposed or adopted plan shall
meet the standards outlined in this
section. The plan need not be referred
to as a “stormwater resource plan.”
Existing planning documents may be
utilized as a functionally equivalent
plan, including, but not limited to,
watershed management plans,
integrated resource plans, urban water
management plans, or similar plans. If
a planning document does not meet
the standards of this section, a
collection of local and regional plans
may constitute a functional equivalent,
if the plans collectively meet all of the
requirements of this part. -
10562-d1
Opportunities to augment local water
supply through groundwater recharge
or storage for beneficial use of
stormwater and dry weather runoff.
Identification
and
Prioritization of
Projects
Plan identifies opportunities to augment
local water supply through groundwater
recharge or storage for beneficial use of
storm water and dry weather runoff.
A section has been
prepared under
"stormwater
resources
components"
10562-d2
Opportunities for source control for
both pollution and stormwater and dry
weather runoff volume, onsite and
local infiltration, and use of stormwater
and dry weather runoff.
Identification
and
Prioritization of
Projects
Plan identifies opportunities for source
control for both pollution and dry
weather runoff volume, onsite and local
infiltration, and use of storm water and
dry weather runoff.
A section has been
prepared under
"stormwater
resources
components"
10562-d3
Projects to reestablish natural water
drainage treatment and infiltration
systems, or mimic natural system
functions to the maximum extent
feasible.
Identification
and
Prioritization of
Projects
Plan identifies projects that reestablish
natural water drainage treatment and
infiltration systems, or mimic natural
system functions to the maximum
extent feasible.
A section has been
prepared under
"stormwater
resources
components"
10562-d4
Opportunities to develop, restore, or
enhance habitat and open space
through stormwater and dry weather
runoff management, including
wetlands, riverside habitats, parkways,
and parks.
Identification
and
Prioritization of
Projects
Plan identifies opportunities to develop,
restore, or enhance habitat and open
space through storm water and dry
weather runoff management, including
wetlands, riverside habitats, parkways,
and parks.
A section has been
prepared under
"stormwater
resources
components"
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 52
CA Water
Code
10560
Section
CA Water Code Section 10560
Requirement
Appendix A
Self
Certification
Checklist
Section
Appendix A Self Certification
Checklist Element
SWRP Section
Reference
10562-d5
Opportunities to use existing publicly
owned lands and easements,
including, but not limited to, parks,
public open space, community
gardens, farm and agricultural
preserves, schoolsites, and
government office buildings and
complexes, to capture, clean, store,
and use stormwater and dry weather
runoff either onsite or offsite.
Identification
and
Prioritization of
Projects
see b8 A section has been
prepared under
"stormwater
resources
components"
10562-d6
Design criteria and best management
practices to prevent stormwater and
dry weather runoff pollution and
increase effective stormwater and dry
weather runoff management for new
and upgraded infrastructure and
residential, commercial, industrial, and
public development. These design
criteria and best management
practices shall accomplish all of the
following:
Identification
and
Prioritization of
Projects
For new development and
redevelopments (if applicable): Plan
identifies design criteria and best
management practices to prevent storm
water and dry weather runoff pollution
and increase effective storm water and
dry weather runoff management for new
and upgraded infrastructure and
residential, commercial, industrial, and
public development.
A section has been
prepared under
"stormwater
resources
components"
10562-
d6A
Reduce effective impermeability within
a watershed by creating permeable
surfaces and directing stormwater and
dry weather runoff to permeable
surfaces, retention basins, cisterns,
and other storage for beneficial use.
A section has been
prepared under
"stormwater
resources
components"
10562-
d6B
Increase water storage for beneficial
use through a variety of onsite storage
techniques.
A section has been
prepared under
"stormwater
resources
components"
10562-
d6C
Increase groundwater supplies
through infiltration, where appropriate
and feasible.
A section has been
prepared under
"stormwater
resources
components"
10562-
d6D
Support low-impact development for
new and upgraded infrastructure and
development using low-impact
techniques.
A section has been
prepared under
"stormwater
resources
components"
10562-d7
Activities that generate or contribute to
the pollution of stormwater or dry
weather runoff, or that impair the
effective beneficial use of stormwater
or dry weather runoff.
Water Quality
Compliance
Plan identifies activities that generate or
contribute to the pollution of storm
water or dry weather runoff, or that
impair the effective beneficial use of
storm water or dry weather runoff.
A section has been
prepared under
"stormwater
resources
components"
Stormwater Resources Plan
County of Lake Watershed Protection District |
Storm Water Resources Plan | March 2025 | 53
CA Water
Code
10560
Section
CA Water Code Section 10560
Requirement
Appendix A
Self
Certification
Checklist
Section
Appendix A Self Certification
Checklist Element
SWRP Section
Reference
10562-d8
Projects and programs to ensure the
effective implementation of the
stormwater resource plan pursuant to
this part and achieve multiple benefits.
These projects and programs shall
include the development of
appropriate decision support tools and
the data necessary to use the decision
support tools.
Implementation
Strategy and
Schedule
Plan projects and programs are
identified to ensure the effective
implementation of the storm water
resource plan pursuant to this part and
achieve multiple benefits. The Plan
identifies the development of
appropriate decision support tools and
the data necessary to use the decision
support tools.
A section has been
prepared under
"stormwater
resources
components"
10562-d9
Ordinances or other mechanisms
necessary to ensure the effective
implementation of the stormwater
resource plan pursuant to this part.
A section has been
prepared under
"stormwater
resources
components"
10562-e
A stormwater resource plan shall use
measurable factors to identify,
quantify, and prioritize potential
stormwater and dry weather runoff
capture projects.
Project ranking and a
project database is
included.
10565-a
Organization,
Coordination,
Collaboration
Local agencies and nongovernmental
organizations were consulted in Plan
development.
This was included in
public outreach.
Meeting Date: 12/16/2025 Page 1 Agenda Item # VII.D.1.
CITY OF LAKEPORT
City Council ☐
City of Lakeport Municipal Sewer District ☒
Lakeport Industrial Development Authority ☐
Municipal Financing Agency of Lakeport ☐
STAFF REPORT
RE: Approval of a Revocable License Agreement with Westside Community Park for Development and Operation of the
Westside Community Trail Park on CLMSD Property
MEETING DATE: 12/16/2025
SUBMITTED BY: Kevin M. Ingram, City Manager
PURPOSE OF REPORT: ☐Information only ☒ Discussion ☒Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:
Review and consider approval of a revised revocable License Agreement with Westside Community Park (WCP) authorizing construction, operation, and maintenance of a multi-use trail park on lands owned by the City of Lakeport Municipal Sewer District (CLMSD).
Action is requested of the City Council acting in its capacity as the Board of Directors of CLMSD.
BACKGROUND:
This item was previously presented at the December 2, 2025 City Council meeting. At that time, no action could be taken because it was discovered that the underlying property is owned not by the City of Lakeport, but by the City of Lakeport Municipal Sewer District (CLMSD). The license agreement has since been corrected to properly reflect CLMSD as the landowner.
As summarized in the prior staff report (included as Attachment 3), the City and Westside Community Park have a longstanding partnership focused on expanding recreational amenities for the community. Over several years, WCP and City Utilities staff identified unused portions of the CLMSD wastewater treatment property as a suitable location for a non-commercial, multi-use trail system serving equestrian, hiking, and mountain biking users.
The project concept builds on the Westside Park Master Plan vision and decades of volunteer-driven development at Westside Community Park. The proposed partnership would allow WCP to design, construct, and maintain all trails and related improvements at no cost to the City or CLMSD, while ensuring that all activities remain fully compatible with ongoing sewer district operations.
The amended license agreement (Attachment 1) presented today corrects ownership references and restructures the action for approval by the CLMSD Board of Directors.
DISCUSSION:
Staff Recommendation: Staff recommends approval of the License Agreement with WCP to allow the nonprofit to construct and operate a multi-use recreational trail system for equestrian, hiking, and mountain biking use on District-owned CLMSD lands. The agreement establishes a clear framework for enhancing public access to open Meeting Date: 12/16/2025 Page 2 Agenda Item # VII.D.1.
space at no cost to the District, while fully preserving the District’s operational authority over wastewater treatment activities and long-term site management.
The amended agreement continues to authorize WCP to construct and operate a public recreational trail network on designated portions of CLMSD property while preserving full operational control and revocation authority for the District. Key elements remain unchanged from the December 2 version, including:
• A revocable, long-term license term providing stability for phased project development • Authorization for equestrian, hiking, and mountain biking uses • WCP responsibility for all design, construction, maintenance, signage, fencing, safety measures, and access road upkeep
• Protection of CLMSD operational areas and infrastructure • Annual fee of $1.00 and full indemnification of CLMSD and City The corrected agreement ensures that all legal, operational, and property-ownership requirements are properly aligned before the project proceeds through Lake County’s land use entitlement process.
OPTIONS:
1. Approve the License Agreement with Westside Community Park and authorize the Board Chair (Mayor) to execute the agreement on behalf of CLMSD.
2. Do not approve the License Agreement and direct staff to notify the Westside Community Park that the District will not move forward with this project at this time.
3. Take no action at this time.
4. Provide alternative direction to staff.
ENVIRONMENTAL IMAPACT:
The granting of this revocable license is exempt from review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines section 15301 (Existing Facilities), as the licensing of an existing public facility and topographical features involving negligible expansion of existing or former use; section 15303 (New Construction or Conversion of Small Structures), as permitting the installation of small structures such as picnic tables, benches, signage, etc.; section 15304 (Minor Alterations to Land), as the minor alteration in the condition of land and/or vegetation which do not involve the removal of healthy, mature, scenic trees; and 15061(b)(3), as it can be seen with certainty that the license and establishment of a trail system will not have a significant effect on the environment. Any future development associated with trail and facility development would be subject to additional CEQA analysis at the time of proposed development.
FISCAL IMPACT:
☐ None ☒ $1.00 Budgeted Item? ☐Yes ☒ No
Budget Adjustment Needed? ☐Yes ☒ No If yes, amount of appropriation increase: $ Affected fund(s): ☐ General Fund ☐ Water OM Fund ☒ Sewer OM Fund ☐ Other:
Comments: There is no direct cost to CLMSD or the City, as all trail construction, maintenance, and operational responsibilities will be carried out by Westside Community Park. The City’s only financial obligation is limited to existing CLMSD property operations, which remain unchanged by the agreement.
COUNCIL PRIORITIES:
☐ Priority #1: Public Safety & Crisis Response
☐ Priority #2: Disaster Resiliency
Meeting Date: 12/16/2025 Page 3 Agenda Item # VII.D.1.
☐ Priority #3: Good Governance & Fiscal Stability
☐ Priority #4: Capital Infrastructure Improvement
☒ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☒ Priority #6: Economic Development
SUGGESTED MOTIONS:
Move to approve the License Agreement with Westside Community Park for construction, operation, and maintenance of the Westside Community Trail Park on CLMSD property, and authorize the Board Chair to execute the agreement on behalf of the CLMSD Board.
☒ Attachments: 1. Draft Revocable License Agreement – Westside Community Trail Park
2. Exhibit A—Site Plan
3. December 2, 2025 Staff Report
381471.8
REVOCABLE LICENSE AGREEMENT
THIS LICENSE AGREEMENT (the “License”) is entered into by and between the City of Lakeport Municipal Sewer District, a dependent special district of the City of Lakeport (“Licensor”) and Westside Community Park, a California non-profit corporation (“Licensee”).
WHEREAS, Licensor is the owner of approximately 482.93 acres of real property outside of City limits but in Lake County consisting of portions of 3865 State Highway 175 (APN 007-003- 79), 3665 State Highway 175 (APN 007-003-78), 3675 State Highway 175 (APN 007-003-77), and 3715 State Highway 175 (APN 007-003-43), as depicted on Exhibit “A”, attached hereto and incorporated herein by reference, used by Licensor for the treatment and disposal of wastewater (“the Property”);
WHEREAS, Licensee is a not-for-profit association and has requested a license to construct and operate, at its own cost and on a non-commercial basis, trails throughout the Property for the purpose of horseback riding and hiking, along with related infrastructure, as described and depicted as the “Trails Park Area” in Exhibit “A” (the “Trails”); WHEREAS, Licensor is willing to permit Licensee to operate the Trailssubject to the terms, conditions, and limitations stated in this License.
NOW, THEREFORE, for valuable consideration, the receipt of which is hereby acknowledged, the Licensor and Licensee agree as follows:
1. Grant of License. Licensor hereby grants to Licensee a non-exclusive, revocable license to use the Trails for the Permitted Use as set forth in Section 4, subject to the terms, conditions and limitations contained herein. Except as provided herein, the Licensee shall not use the Trails for any other purpose.
2. Licensee Representations. Licensee represents and declares that Licensee has the legal right as well as experience and professional skill to safely operate and use the Trails for the Permitted Use as set forth in Section 4.
3. Term. Subject to the termination provisions in Section 6, the term of this License shall be for a period commencing on June 1, 2026 and ending on June 1, 2056. Upon the expiration of this License, the parties may, but are under no obligation to, extend the term of this License. Any extension of this License shall be in writing signed by both parties following approval by Licensor. Licensor may revoke the License at any time for any reason, pursuant to Section 6 below.
4. Permitted Use. Licensee shall use the Trailsfor recreational horse trails and hiking and bicycling trails for public use. Licensee shall use and operate the Trails in compliance with the terms, conditions and limitations contained herein. Except as provided herein, Licensee shall not use the Trails for any other purpose. No other part of the Property shall be used by Licensee unless authorized in writing by Licensor.
License Agreement Page 2
381471.8
5. Conditions and Restrictions. This License is subject to the following terms, conditions and limitations:
a. Trails. Licensee may construct trails throughout the Property. However, before constructing any of the Trails, the City Manager of the City of Lakeport, or designee thereof, must approve the location, form, and size of all Trails. Licensee must submit written plans for the Trails to Licensor for advanced review and approval. After approval of any of the Trails, Licensee may not make any further alterations without the further written consent of Licensor. Trail design, construction, and maintenance shall minimize erosion, runoff, and disturbance to wildlife and livestock.
b. No Reimbursement. Licensor will not compensate Licensee for the cost of designing, constructing, or maintaining any of the Trails or any of the associated improvements constructed as part of the Trail system.
c. Improvements. Licensee shall be permitted, at its own cost, to design, create, and install signage for the Trails, provided such signage must be approved in advance in writing by the City Manager of the City of Lakeport or designee thereof. Licensee may also be permitted to install picnic tables, benches, or similar improvements, provided such improvements have been approved in advance in writing by the City Manager of the City of Lakeport or designee thereof. Licensee may not make any other improvements to the Property without the prior written consent of Licensor. Licensee is solely responsible for all costs to design, construct, install, and maintain any and all improvements. Any alterations or improvements made to the Property will remain on the Property and/or be surrendered to Licensor, at no cost to Licensor, when this License terminates or expires. Licensee shall maintain all improvements in good condition and repair at all times during the term of this License, including but not limited to ensuring such improvements remain free from graffiti, vandalism, damage, and deterioration.
Licensee shall promptly remove any graffiti and repair any damage to the improvements at the Licensee's sole cost and expense. All construction, maintenance, repairs, and cleaning shall be performed in a professional and workmanlike manner and in compliance with all applicable laws, regulations, and building codes.
d. Access. Access to the Property will be via 3865 State Highway 175 using a gravel access road and an approved access point near Matthews Road. Licensee shall cause the roadway and parking area serving the Trails to be surfaced with adequate surfacing to reduce dust impacts to neighboring properties and the highway. Licensee shall be solely responsible for maintaining the access road and parking areas. Use of the roadway and parking area serving the Trails shall be open to the public generally.
e. Building and Operations. Licensee is solely responsible for constructing, maintaining, and operating the Trails. Licensee is solely responsible for all costs to operate and maintain the Trails as well as all costs to maintain any signage or improvements installed by Licensee on the Property. Licensee is solely responsible for maintaining and completing necessary replacement or repairs to existing boundary fencing on the Property, as well as installing any additional fencing or signage determined by Licensor to be necessary to protect Licensor’s License Agreement Page 3
381471.8
facilities, other authorized users of the Property, and/or adjacent properties. Notwithstanding the foregoing, Licensee shall not be responsible for replacing or repairing the North-South hillside fencing existing on the Property, except to the extent that any such repair or replacement is made necessary due to damage caused by Licensee's acts, omissions, operations, or use of the Property. All construction, maintenance, and repairs shall be performed in a professional and workmanlike manner and in compliance with all applicable laws, regulations, and building codes. f. Property Restrictions. Licensee agrees to comply in all respects with Chapter 9.08 of the Lakeport Municipal Code except as expressly modified by the terms of this License. Licensee hereby accepts the Property as-is, subject to all conditions, covenants and restrictions of record, and all applicable zoning, municipal, county and state laws, ordinances, regulations, park policies and regulations, and any changes thereto, governing the use and occupancy of the Trails and the Property, including but not limited to any and all permit and land use entitlements required and/or granted by the County of Lake. Licensee shall not obtain or cause to be issued any permit, zone change or other entitlement that will be binding on Licensor or the Property. Licensee will be responsible for complying with all standards of health, sanitation, fire, housing, and safety as required by law. Licensee will obey all rules and regulations from Licensor, including use of the roadway and parking area located on the Property. g. In addition to any other act prohibited by this license, Licensee shall not do, commit, suffer, permit, nor allow upon the Property or Trails any act or thing which:
i. Will increase the existing rates of insurance on the Property or Trails;
ii. Will cause a cancellation of any policy of insurance covering the Property or Trails;
iii. Might be prohibited by the standard form of fire insurance policy; iv. Will constitute waste upon the Property or Trails;
v. Will create a nuisance upon the Property or Trails;
vi. Will cause the claims of mechanics, artisans, or materialmen to become a lien on the Property or Trails.
h. Licensor’s Rights. Licensee shall operate the Trails subject the following:
i. Licensor’s right to revoke this License Agreement with or without cause pursuant to Sections 3 and 6;
ii. Licensor’s rights to establish and enforce reasonable rules and regulations, such as opening/closing times, concerning the management, use, and operation of the Property and the Trails; License Agreement Page 4
381471.8
iii. Licensor’s right to disapprove any person, employee, or entity retained by Licensee to conduct or perform the Permitted Use on the Trails or the design, construction, or maintenance of Trails or authorized improvements;
iv. Licensor’s right to lease or license portions of the Property to third parties for other uses, including but not limited to cattle grazing and other open space or recreational uses;
v. Licensor’s right to temporarily close any portion of the Property or Trails for maintenance purposes, public health and safety, or for wastewater treatment operations;
vi. Licensor’s right to enter the Property at any time to show the Property to prospective purchasers or make inspections or repairs necessary for public safety;
vii. Licensor’s right to use the Property for wastewater treatment, storage, or disposal operations; and
viii. Licensor’s right to adjust the boundaries of the Property where the Trails are located.
i. Permits. Licensee is responsible for obtaining all permits, businesses licenses, and any other governmental authorizations required for Licensee’s use of the Trails.
Licensee shall be required to operate the Permitted Use subject to additional conditions imposed by other governmental agencies having jurisdiction over same. j. “As is” Condition. Licensee agrees that that it is accepting the Property “as is” without any representation or warranty by Licensor, the City of Lakeport, or Licensor’s or the City of Lakeport’s officers, officials, employees or agents, express, implied or statutory, except as expressly provided herein, as to:
i. the nature or condition of the Property, (including, without limitation, any design or natural defect of any kind or nature whatsoever);
ii. the Property’s and/or Trails’ fitness for Licensee’s intended use of same.
Licensee is, or prior to their use of the Property will be, familiar with the Property. Licensee is relying solely upon, and will have conducted, its own independent inspection, investigation, and analysis of the Property as it deems necessary or appropriate. k. Maintenance. Licensee shall maintain the Trails and any and all associated signage and improvements in a neat and orderly condition, free from litter, debris, graffiti, fallen License Agreement Page 5
381471.8
limbs, and other rubbish or obstructions. During the term of this License, Licensee shall be responsible for maintaining the Property and Trails in equal and/or better condition than their current condition. Breakdown or failure of any of Licensee’s property or equipment caused by normal wear-and-tear shall be the responsibility of Licensee and Licensee shall be solely responsible for its repair and/or replacement.
l. Anti-discrimination. Licensee shall neither discriminate nor permit discrimination against any person or group of persons on the grounds of race, sex, gender, creed, national origin, color, physical or mental disability as defined by law, religion, age, medical condition, marital status, ancestry, sexual orientation, or other protected basis. m. License Not a Lease. This License does not constitute a lease, but constitutes a mere non-exclusive, revocable license and Licensee is limited to the use of the Trails expressly and specifically described herein. Licensee disclaims any interest that when coupled with the License herein granted would render it irrevocable.
6. Termination. This Revocable License Agreement may be terminated by either party upon 30 days’ written notice delivered in the manner set forth in Section 14. Licensor may terminate this License immediately upon written notice delivered in the manner set forth in Section 14 if Licensor determines, in its sole discretion, that such termination is necessary for public health and safety or Licensor operations. In the event of termination by either party, the Licensor will permit Licensee to enter the Property to recover Licensee’s personal property.
7. Indemnification. To the fullest extent permitted by law, Licensee shall indemnify, hold harmless, and defend Licensor, its officers, agents, employees and volunteers and/or the City of Lakeport, its officers, agents, employees and volunteers from and against any and all claims and losses, costs or expenses for any damage due to death or injury to any person, whether physical, emotional, consequential or otherwise, and injury to any property arising out of or in connection with any and all use, operations, or activities conducted pursuant to the terms of this License, including, but not limited to, Licensee’s alleged negligence, recklessness or willful misconduct or other wrongful acts, errors or omissions of Licensee or any of its officers, employees, volunteers, servants, agents, subcontractors, or anyone directly or indirectly employed by either Licensee or its subcontractors, in the performance of this License or the Permitted Use or its failure to comply with any of its obligations contained in this License, except such loss or damage which is caused by the sole active negligence or willful misconduct of Licensor and/or the City of Lakeport. Such costs and expenses shall include reasonable attorneys’ fees due to counsel of Licensor’s choice, expert fees and all other expenses of litigation. Licensee shall not be entitled to any refund of attorneys’ fees, defense costs or expenses in the event that it is adjudicated to have been non-negligent. Licensee acknowledges that Licensor would not enter into this License in the absence of Licensee’s commitment to indemnify and protect Licensor and the City of Lakeport as set forth herein. The parties agree that the covenants contained in this section 7 shall survive the expiration or termination of this License.
8. Fee for License. Licensee will pay Licensor $1 per year (the “License Fee”) for this License on or before the January 1 of each year this License is in effect.
License Agreement Page 6
381471.8
9. Insurance. Licensee shall maintain insurance as described in this section and shall require all of its subcontractors, consultants, and other agents to do the same. Approval of the insurance by the Licensor shall not relieve or decrease any liability of Licensee. a. Licensor will not execute this License until it has received a complete set of all required documentation of insurance coverage. However, failure to obtain the required documents prior to the work beginning shall not waive the Licensee’s obligation to provide them.
Licensee shall file with Licensor:
i. Certificate of Insurance, indicating companies acceptable to Licensor, with a Best’s Rating of no less than A:VII showing. The Certificate of Insurance must include the following reference:
Westside Community Horse Park.
ii. Documentation of Best’s rating acceptable to the Licensor. iii. Original endorsements effecting coverage for all policies required by this License.
iv. Complete, certified copies of all required insurance policies, including endorsements affecting the coverage.
b. Coverage Amounts. Insurance coverage shall be at least in the following minimum amounts:
• General Liability:
• General Aggregate: $2,000,000
• Products Comp/Op Aggregate $2,000,000
• Personal & Advertising Injury $1,000,000
• Each Occurrence $1,000,000
• Fire Damage (any one fire) $ 100,000
• Medical Expense (any 1 person) $ 10,000
• Workers’ Compensation:
• Workers’ Compensation Statutory Limits
• EL Each Accident $1,000,000
• EL Disease - Policy Limit $1,000,000
• EL Disease - Each Employee $1,000,000
Any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements or limits shall be available to the Licensor and/or the City of Lakeport as additional insured. Furthermore, the requirements for coverage and limits shall be the greater of (i) the minimum coverage and limits specified in this License, or (ii) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured.
License Agreement Page 7
381471.8
The minimum coverages and policy forms specified in this Section 9 are subject to review at the end of every two (2) year period this License remains in effect. On such review, Licensor shall preliminarily determine whether it considers the coverage adequate in light of the value of money, the cost of coverage, the experience of the parties during the preceding two (2) years with respect to claims, actions, settlements, judgments and other matters relevant to the question of adequate insurance coverage. If Licensor determines that the coverage is not adequate, it shall specify the coverage requested in writing and Licensee shall continue to satisfy the requirements of this Section 9 by procuring and filing proof of such additional coverage as requested by Licensor. If Licensee does not agree, the parties shall attempt to settle the question by negotiation and appropriate modification of this Section 9. However, if the parties are unable to agree after hearing before the City of Lakeport Municipal Sewer District’s Board of Directors, the decision of the Board of Directors shall be final.
c. General Liability Insurance. Commercial General Liability Insurance shall be no less broad than ISO form CG 00 01. Coverage must be on a standard Occurrence form. ClaimsMade, modified, limited or restricted Occurrence forms are not acceptable. d. Worker’s Compensation Insurance. Licensee is aware of the provisions of Section 3700 of the Labor Code which requires every employer to carry Workers’ Compensation (or to undertake equivalent self-insurance) and shall maintain Worker’s Compensation insurance if and as required by the laws of the State of California. e. Subcontractors. Licensee shall require each of its subcontractors to maintain insurance coverage that meets all of the requirements of this License. Licensee agrees that if it does not keep the insurance coverages required by this License in full force and effect, Licensor may either (i) immediately terminate this License; or (ii) take out the necessary insurance and pay the premium(s) thereon at Licensee’s expense.
f. Proof of Renewal. Licensee shall provide proof that policies of insurance required by this License expiring during the term of this License have been renewed or replaced with other policies providing at least the same coverage. Such proof will be furnished at least two (2) weeks prior to the expiration of the coverages.
g. Additional Insured Endorsements. The Licensor, its Board of Directors, commissions, officers, and employees, as well as the City of Lakeport, its City Council, commissions, officers, and employees must be endorsed as an additional insured for each policy required herein, including the general liability and automobile policies for liability arising out of ongoing and completed operations by or on behalf of the Licensee. Licensee’s insurance policies shall be primary as respects any claims related to or as the result of the Licensee’s work or performance. Any insurance, pooled coverage or self-insurance maintained by the Licensor, its elected or appointed officials, directors, officers, agents, employees, volunteers, or consultants, or the City of Lakeport, its elected or appointed officials, directors, officers, agents, employees, volunteers, or consultants shall be non-contributory. All of the policies required under this License shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty (30) days’ prior written notice to Licensor. Licensee agrees to require its insurer License Agreement Page 8
381471.8
to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions. All endorsements shall be signed by a person authorized by the insurer to bind coverage on its behalf. h. Failure to Maintain Coverage. In the event any policy is canceled prior to the termination or expiration of the term of this License and the Licensee does not furnish a new certificate of insurance prior to cancellation, Licensor has the right, but not the duty, to obtain the required insurance and deduct the premium(s) from any amounts due the Licensee under this License. Failure of the Licensee to maintain the insurance required by this License, or to comply with any of the requirements of this section, shall constitute a material breach of this License.
i. Notices. Licensee shall provide immediate written notice if (i) any of the required insurance policies is terminated; (ii) the limits of any of the required policies are reduced; (iii) or the deductible or self-insured retention is increased. Licensee shall provide no less than 30 days’ notice of any cancellation or material change to policies required by this License. Licensee shall provide proof that cancelled or expired policies of insurance have been renewed or replaced with other policies providing at least the same coverage. Such proof will be furnished at least two (2) weeks prior to the expiration of the coverages. The name and address for Additional Insured Endorsements, Certificates of Insurance and Notices of Cancellation is: City of Lakeport Municipal Sewer District, Attn: City Clerk’s Office, 225 Park St., Lakeport, CA 95453. j. Licensee’s Insurance Primary. The insurance provided by Licensee, including all endorsements, shall be primary to any coverage available to Licensor and/or the City of Lakeport. Any insurance or self-insurance maintained by Licensor and/or the City of Lakeport, or any officials, directors, officers, employees, agents or volunteers thereof, shall be in excess of Licensee’s insurance and shall not contribute with it.
k. Waiver of Subrogation. Licensee hereby waives all rights of subrogation against the Licensor and the City of Lakeport. Licensee shall additionally waive such rights either by endorsement to each policy or provide proof of such waiver in the policy itself. Licensee agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the Licensor has received a waiver of subrogation endorsement from the insurer.
l. Report of Claims to Licensor. Licensee shall report to the Licensor, in addition to the Licensee’s insurer, any and all insurance claims submitted to Licensee’s insurer in connection with the services under this License.
m. Premium Payments and Deductibles. Licensee must disclose all deductibles and self-insured retention amounts to the Licensor. The Licensor may require Licensee to provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within retention amounts. Ultimately, Licensor must approve all such amounts prior to execution of this License. Licensor has no obligation to pay any premiums, assessments, or License Agreement Page 9
381471.8
deductibles under any policy required in this License. Licensee shall be responsible for all premiums and deductibles in all of Licensee’s insurance policies. The amount of deductibles for insurance coverage required herein are subject to Licensor’s approval.
10. Environmental Matters. Licensee shall not cause, permit, or suffer any hazardous substances to be brought upon, kept, used, spilled or released in, on, under or about the Property or Trails. As used in this Section, “hazardous substances” shall mean any substance or material at the level defined or designated as hazardous or toxic waste, hazardous or toxic material, a hazardous or toxic chemical, a hazardous, toxic or radioactive substance, petroleum or other similar term, by any federal, State or local environmental statute, regulation or ordinance presently in effect or that may be promulgated in the future, as such statutes, regulations and ordinances may be amended from time to time. In the event that the Licensee becomes aware of the release of any hazardous substances on, or other environmental condition, problem or liability with respect to, the Property or Trails, Licensee agrees to promptly notify Licensor in writing of such condition. Licensee further agrees to take actions to investigate and clean up the release of any hazardous substances on, or other environmental condition, problem, or liability affecting the Property or Trails promptly after Licensee becomes aware of any such condition and to keep Licensor advised in writing of all such actions taken by Licensee. The representations and warranties set forth in this Section 10 shall survive the expiration or termination of this License.
11. Default. In the event of a breach by Licensee of any of the terms of this License, all rights of Licensee hereunder shall cease and terminate, and in addition to all other rights it may have at law or in equity, Licensor may re-enter the Property and Trails and take possession thereof without notice, and may remove any and all persons therefrom, and may also revoke this License; and upon any such revocation, all rights of Licensee in and to the Property and Trails shall immediately cease and terminate.
12. Waiver. The waiver by Licensor of any breach by Licensee hereunder, or the failure on the part of Licensor to enforce any rights it may have hereunder, shall not constitute a waiver of any other or subsequent, similar, or different breaches, or a waiver of Licensor’s power to enforce such rights.
13. Taxes and Assessments. Licensee shall timely pay to the appropriate governmental authorities any and all applicable taxes and assessments, if any, imposed upon the Property by any authority having the power to tax or assess Licensee’s operation or the goods sold on the Trails, if any, during the term of this License.
14. Assignment. This License is personal to Licensee. Licensee agrees not to assign, sublet, sublease, sell, transfer, encumber, pledge or otherwise hypothecate any part of the Licensor Trails or Licensee’s interest herein to any entity without the prior written consent of Licensor. Any purported assignment by Licensee of this License shall be void and a basis for immediate termination of this License.
15. Notice. All notices, consents, requests, demands, approvals, waivers, and other communications desired or required to be given hereunder (referred to collectively as “notices”) License Agreement Page 10
381471.8
shall be in writing and signed by the party so giving the notice, and shall be effectively given or served:
a. on the date of personal service upon the person to whom it is directed; or b. on the date the notice is received or rejected provided it is sent prepaid, registered or certified mail, return receipt requested; or c. on the date the notice is delivered by a courier service to the address of the person to whom it is directed provided it is sent prepaid to the address of the person to whom it is directed. The addresses of the parties are:
To Licensor: CITY OF LAKEPORT MUNICIPAL SEWER DISTRICT
225 Park Street
Lakeport, CA 95453
Attn: City Manager
To Licensee: Westside Community Park
1350 Berry Street
Lakeport, CA 95453
Attn: Board Chairperson
Either party may, from time to time, change its address by giving written notice to the other party thereof in the manner outlined above.
16. Governing Law; Venue. This License shall be interpreted, enforced and governed by the laws of the State of California. Any legal action arising out of this License shall be filed and prosecuted in the Lake County Superior Court.
17. Severability. In case any one or more of the provisions contained in this License shall for any reason be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provision hereof, and the remainder of the provisions of this License shall continue in full force and effect without impairment.
18. Sole Agreement. This License constitutes the sole agreement between Licensor and Licensee with respect to the Trails.
19. No Partnership or Joint Venture. Licensor is not, and shall not be considered a partner or joint venture with Licensee or the City of Lakeport by reason of this License. a. Under no circumstances shall Licensee or its employees look to Licensor or the City of Lakeport as an employer. Licensee shall not be entitled to any benefits. Licensor makes no representation as to the effect of this independent contractor relationship on Licensee’s previously earned California Public Employees Retirement System (“CalPERS”) retirement benefits, if any, and Licensee specifically assumes the responsibility for License Agreement Page 11
381471.8
making such a determination. Licensee shall be responsible for all reports and obligations including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation, and other applicable federal and state taxes. b. In the event that Licensee or any employee, agent, or subcontractor of Licensee performing under this License claims or is determined by a court of competent jurisdiction or CalPERS to be eligible for enrollment in CalPERS as an employee of Licensor and/or the City of Lakeport, Licensee shall indemnify, defend, and hold harmless Licensor and/or the City of Lakeport for the payment of any employee and/or employer contributions for CalPERS benefits on behalf of Licensee or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of Licensor and/or the City of Lakeport.
20. Counterparts. This License may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall be deemed one and the same instrument. The parties acknowledge and agree that this License may be executed by electronic signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature. Without limitation, "electronic signature" shall include faxed or emailed versions of an original signature, electronically scanned and transmitted versions (e.g., via pdf) of an original signature, or a digital signature. [Signature page to follow.]
License Agreement Page 12
381471.8
IN WITNESS WHEREOF, each of the parties has caused its authorized representative to execute duplicate original counterparts of this License. “Licensor” “Licensee”
City of Lakeport Municipal Sewer District Westside Community Park By: __________________________ By:______________________________ CLMSD Board Chair Name, Level of Officer e.g., President Date: _______________ Date: __________________
By: _______________________________
Name, Level of Officer e.g., Secretary
Date: __________________
Attest:
By:
Kelly Buendia, Clerk of the Board
Date:
Approved as to form:
By:
David J. Ruderman, City Attorney
Date:
License Agreement Page 13
381471.8
EXHIBIT A
MAP OF THE PROPERTY AND TRAILS
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
City of Lakeport, CA
I
Exhibit A
Westside Community Horse Park -- Site Map
Wastewater Treatment Plant &
Reservoir
Equestrian Center
(Future)
Non-Potable Water
Disposal Zone
Trails Park
Area
Non-Potable Water
Disposal Zone
Trailhead Location
(Approximate)
Vehicle Access
3865 State HWY 175
Trailhead Access Path
(Non-Vehicular)
Existing N/S
Hillside Fenceline
(Approximate)
New E/W Use
Separation
Fenceline
Parking Area
City Limit
Boundary
Note: Minimum 100 ft setback from
non-potable irrigation sprinklers
Meeting Date: Page 1 Agenda Item #
425388.1
CITY OF LAKEPORT
City Council ☒
City of Lakeport Municipal Sewer District ☐
Lakeport Industrial Development Authority ☐
Municipal Financing Agency of Lakeport ☐
STAFF REPORT
RE: Approval of a Revocable License Agreement with Westside Community Park for Development and Operation of the
Westside Community Trail Park on CLMSD Property
MEETING DATE: 12/02/2025
SUBMITTED BY: Kevin M. Ingram, City Manager
PURPOSE OF REPORT: ☐Information only ☒ Discussion ☒Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:
Review and consider adoption of a revocable License Agreement with Westside Community Park (WCP) authorizing the construction, operation, and maintenance of a multi-use trails park on designated portions of the City-owned CLMSD wastewater treatment property.
BACKGROUND:
The City of Lakeport and Westside Community Park (WCP) have collaborated for many years to expand recreational opportunities for the Lakeport community. Building on this longstanding partnership, the proposed trail park represents the next major step in creating accessible, volunteer-supported recreational amenities that serve a wide range of users.
Westside Community Park Partnership & Committee Overview: Westside Community Park is a volunteer-led nonprofit formed to plan, develop, and enhance recreation facilities serving the Lakeport area. Under the longterm 2008 Memorandum of Understanding between the City and WCP, the nonprofit has successfully led the development of Westside Community Park Phase II—fundraising and constructing facilities at its own cost, coordinating volunteer labor and youth sports partnerships, and delivering substantial public benefit without City financial contribution. As highlighted in the organization’s recent newsletters, the Committee continues to advance major recreation initiatives, mobilize local volunteers, pursue grants, and support long-term park planning—making them uniquely capable of constructing and operating the proposed multi-use trails park on CLMSD property.
Evolution Toward an Equestrian and Trails Facility: The vision for equestrian and trail recreation dates back to the 1998, 2003, and 2011 Westside Park Master Plans, each of which identified equestrian amenities and trail systems as core project elements. Over time, and based on further evaluation of suitable land, City staff and WCP volunteers identified unused portions of the CLMSD wastewater treatment property as better suited for large-scale equestrian activity due to terrain, acreage, and separation from residential neighborhoods.
Between 2021 and 2022, the City Council reviewed presentations from WCP regarding the development of an equestrian center and supported a term sheet and Letter of Intent associated with a Proposition 68 grant proposal. Although the grant was unsuccessful, the WCP Board reaffirmed its commitment to the project and adapted its strategy toward developing a multi-use recreational trails park as the first phase—an approach that can serve equestrian, hiking, and mountain biking communities with lower costs and broad community benefit.
Meeting Date: Page 2 Agenda Item #
425388.1
Since 2022, WCP and City Utilities staff have worked collaboratively to identify trail alignments that do not interfere with wastewater treatment operations and are compatible with environmental conditions and longterm CLMSD needs.
CLMSD Property Location and Jurisdiction: Although owned by the City of Lakeport, the CLMSD property is located outside City limits within the unincorporated area of Lake County. As such, the project is subject to the County’s land use entitlement process. Westside Community Park has already begun coordination with the Lake County Community Development Department to identify required permits and environmental review steps, and the City will continue partnering in these discussions to support a smooth entitlement and development process.
DISCUSSION:
Staff Recommendation: Staff recommends approval of the License Agreement with WCP to allow the nonprofit to construct and operate a multi-use recreational trail system for equestrian, hiking, and mountain biking use on City-owned CLMSD lands. The agreement establishes a clear framework for enhancing public access to open space at no cost to the City, while fully preserving the City’s operational authority over wastewater treatment activities and long-term site management.
The proposed license formalizes a public-private partnership that builds on the City’s decades-long relationship with WCP and leverages the organization’s volunteer, fundraising, and project management capacity to expand recreation opportunities well beyond what the City could support on its own. Over the past two years, Utilities, Public Works, and Administrative staff have worked closely with WCP to identify suitable trail areas and ensure that proposed alignments do not conflict with CLMSD operations. Extensive care has been taken to avoid areas needed for wastewater disposal, pond maintenance, pipeline infrastructure, and service access, ensuring compatibility between recreational use and the primary public purpose of the property.
This partnership model continues WCP’s longstanding role in helping develop regional recreation amenities that enhance quality of life for Lakeport residents and the greater community. The full proposed license agreement is included as Attachment 1, and key components are summarized below:
• License Term: The proposed license establishes a 30-year term beginning upon execution, providing WCP with the certainty needed to plan, fund, and phase trail development over time. However, the license remains fully revocable at any time by the City to protect public health, safety, or the operational needs of the CLMSD wastewater treatment system. This structure balances long-term project stability for WCP with the City’s need to maintain flexibility and retain full control of the property for essential municipal functions.
• Permitted Uses: The license authorizes Westside Community Park to develop and operate a noncommercial public trail system accommodating horseback riding, hiking, and mountain biking. While individual trail segments may be designated for specific uses to reduce user conflicts, the overall trail area will remain accessible to all user groups. The agreement also clarifies that the City will not be responsible for enforcing any trail-specific use designations established by the operator. • Trail Construction and Maintenance: Westside Community Park will be solely responsible for all aspects of trail design, construction, improvements, and ongoing maintenance, including trail surfacing and repair, installation of signage and fencing, safety measures, litter and debris management, and upkeep of the access road with appropriate dust control. The City will not provide labor or financial support for any portion of trail development or maintenance. To ensure compatibility with CLMSD operations and site conditions, each proposed trail segment will be subject to City review and approval prior to construction.
• Access: Public access to the trail system will occur through the existing Caltrans-approved encroachment at 3865 State Highway 175. Westside Community Park will be responsible for maintaining the access Meeting Date: Page 3 Agenda Item #
425388.1
road with adequate surfacing to ensure safe vehicle entry and to minimize dust impacts on neighboring properties.
• Fees, Insurance and Indemnification: The license establishes an annual fee of $1.00, reflecting the substantial public benefit generated by the project. Westside Community Park will be required to maintain general liability insurance naming the City as an additional insured, and must indemnify and hold the City harmless for all activities associated with trail construction, operation, and use.
Alignment with Citywide Goals: The proposed license agreement strongly aligns with several adopted City goals and policy priorities by expanding recreational access, activating underutilized public lands, and supporting longterm community wellness and open space preservation. Together, these elements ensure the project advances the City’s broader vision for high-quality recreation, sustainable land management, and an enhanced quality of life for Lakeport residents.
City Manager Goal IT-3 – Recreation Program Master Plan and Activation of Existing Parks: The proposed agreement directly supports the City’s FY 2025/26 Goal IT-3 by enabling the activation of an underutilized Cityowned property for broad recreational purposes. The trails park expands access to outdoor recreation, supports youth- and family-oriented activities, and establishes a framework in partnership with WCP that can be integrated into a future Recreation Program Master Plan.
City Council Priority Area: Safe, Sustainable & Attractive Neighborhoods: This project advances multiple priority objectives by:
• Increasing access to parks and recreational amenities • Supporting community health and active lifestyles
• Expanding access to open space
• Preserving natural vistas
• Promoting environmentally protective and economically beneficial public land uses The activation of the CLMSD property as a public recreational asset aligns with the City’s commitment to health, safety, and environmental stewardship.
Westside Park Master Plan: The agreement is fully consistent with long-standing master planning objectives that identify equestrian uses, trail development, and natural area access as core recreation priorities for the Lakeport community. The proposed trail park represents the next incremental step toward a future equestrian center envisioned since the 1990s.
General Plan Consistency: This project aligns with two key General Plan goals:
• Objective PR-1: Provide recreational facilities and access that support play, relaxation, and enrichment for all community members.
• Objective OS-2: Preserve and ensure access to natural open space areas harmonious with environmental and neighborhood conditions.
The trail park expands low-impact recreational opportunities that connect residents and visitors to the natural landscape surrounding Lakeport.
OPTIONS:
1. Approve the License Agreement with Westside Community Park and authorize the City Manager to execute the agreement.
2. Do not approve the License Agreement and direct staff to notify the Westside Community Park that the City will not move forward with this project at this time.
3. Take no action at this time.
4. Provide alternative direction to staff.
Meeting Date: Page 4 Agenda Item #
425388.1
ENVIRONMENTAL IMAPACT:
The granting of this revocable license is exempt from review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines section 15301 (Existing Facilities), as the licensing of an existing public facility and topographical features involving negligible expansion of existing or former use; section 15303 (New Construction or Conversion of Small Structures), as permitting the installation of small structures such as picnic tables, benches, signage, etc.; section 15304 (Minor Alterations to Land), as the minor alteration in the condition of land and/or vegetation which do not involve the removal of healthy, mature, scenic trees; and 15061(b)(3), as it can be seen with certainty that the license and establishment of a trail system will not have a significant effect on the environment. Any future development associated with trail and facility development would be subject to additional CEQA analysis at the time of proposed development.
FISCAL IMPACT:
☐ None ☒ $1.00 Budgeted Item? ☐Yes ☒ No
Budget Adjustment Needed? ☐Yes ☒ No If yes, amount of appropriation increase: $ Affected fund(s): ☐ General Fund ☐ Water OM Fund ☐ Sewer OM Fund ☐ Other:
Comments: There is no direct cost to the City, as all trail construction, maintenance, and operational responsibilities will be carried out by Westside Community Park. The City’s only financial obligation is limited to existing CLMSD property operations, which remain unchanged by the agreement.
COUNCIL PRIORITIES:
☐ Priority #1: Public Safety & Crisis Response
☐ Priority #2: Disaster Resiliency
☐ Priority #3: Good Governance & Fiscal Stability
☐ Priority #4: Capital Infrastructure Improvement
☒ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☒ Priority #6: Economic Development
SUGGESTED MOTIONS:
Move to approve the License Agreement with Westside Community Park for the construction, operation, and maintenance of the Westside Community Trail Park on designated portions of the City’s property, and to authorize the City Manager to execute the agreement.
☒ Attachments: 1. Draft Revocable License Agreement – Westside Community Trail Park
2. Exhibit A—Site Plan
Meeting Date: 12/16/2025 Page 1 Agenda Item # VII.D.2.
CITY OF LAKEPORT
City Council
City of Lakeport Municipal Sewer District
Lakeport Industrial Development Authority
Municipal Financing Agency of Lakeport
STAFF REPORT
RE: Establishment of the City Lands Advisory Committee as a Permanent Standing Committee to Advise on the Use, Lease, and Disposition of City-Owned Properties
MEETING DATE: 12/16/2025
SUBMITTED BY: Kevin M. Ingram, City Manager
PURPOSE OF REPORT: Information only Discussion Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:
The City Council is being asked to adopt a resolution establishing the City Lands Advisory Committee as a permanent standing committee pursuant to Government Code section 54952(b) to advise on a broad range of matters concerning City-owned lands, associated agreements, and strategic land use considerations. The body will remain advisory only, with all final decisions reserved for the full City Council.
BACKGROUND/DISCUSSION:
In September 2024, the City Council approved creation of the City Lands Working Group to provide strategic review of proposals involving City-owned lands, leases, and cooperative agreements with community partners.
The Working Group was formed in response to multiple active and emerging land-use proposals—including the Carnegie Library lease, the CLMSD Equestrian & Trails project, and the Dutch Harbor Hotel development—which required coordinated policy direction and early evaluation prior to formal City Council consideration.
The initial purpose of the Working Group was to more thoroughly evaluate a range of alternatives and options, streamline review processes, and ensure that all land-related proposals aligned with the City’s broader goals for economic development, community well-being, and public space optimization.
Effectiveness and Value of the Working Group (2024 & 2025): Over the past two years, the Working Group has proven to be an exceptionally valuable tool for staff, particularly in its ability to evaluate alternatives, explore options, and guide early project direction. Its work has strengthened several key community partnerships ultimately brought forward for City Council approval, including the CLERC Carnegie Library lease establishing a community education center, the Westside Community Park license for development of the trails park on CLMSD property, and an expanded partnership with the Lake County Arts Council that will allow the Silveira Community Center to expand use by the public to include evenings and weekends. Additional efforts have included assisting with the Dutch Harbor hotel attraction initiative, initiating Surplus Land Act proceedings for the former Transfer Station property, and providing recommendations for an upcoming request for proposals for cattle grazing on CLMSD lands, along with review of numerous other smaller-scale agreements and propertyrelated matters.
Need for a Permanent Standing Committee: Given the volume, diversity, and strategic importance of City-owned lands—and the demonstrated benefits of structured advisory review—staff now recommends transitioning the Meeting Date: 12/16/2025 Page 2 Agenda Item # VII.D.2.
temporary working group into a permanent standing committee, consistent with Government Code provisions and the structure described in the proposed resolution.
The permanent City Lands Advisory Committee would:
• Provide a continuous and consistent venue for the review of proposed uses, leases, dispositions, or other agreements involving City-owned land
• Offer strategic guidance to ensure City assets are used in ways that advance community goals • Support long-term planning, public transparency, and cross-departmental coordination • Allow for proactive rather than reactive review of opportunities related to City-owned property The Committee will remain advisory only, without authority to approve, deny, or execute agreements. All recommendations will be forwarded to the full City Council for consideration at publicly noticed meetings.
This structure reflects best practices for municipal land stewardship, ensures ongoing public engagement, and strengthens governance over some of the City’s most important long-term assets.
OPTIONS:
1. Adopt the Resolution establishing the City Lands Advisory Committee as a permanent standing committee.
2. Take no action.
3. Or alternatively, the Council may provide staff alternative direction.
FISCAL IMPACT:
None $ Budgeted Item? Yes No
Budget Adjustment Needed? Yes No If yes, amount of appropriation increase: $ Affected fund(s): General Fund Water OM Fund Sewer OM Fund Other:
Comments: No fiscal impact.
COUNCIL PRIORITIES:
☒ Priority #1: Public Safety & Crisis Response
☒ Priority #2: Disaster Resiliency
☒ Priority #3: Good Governance & Fiscal Stability
☒ Priority #4: Capital Infrastructure Improvement
☒ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☒ Priority #6: Economic Development
SUGGESTED MOTIONS:
Move to adopt the Resolution establishing the City Lands Advisory Committee as a permanent standing committee to advise on the use, lease, and disposition of City-owned lands.
Attachments: 1. Resolution
423349.1
RESOLUTION NO. _____ (2025)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKEPORT
ESTABLISHING THE CITY LANDS ADVISORY COMMITTEE
WHEREAS, the City of Lakeport owns several properties throughout the City that are currently utilized through various agreements with multiple community partners; WHEREAS, these properties are key assets, and their use plays an essential role in the vitality of the community;
WHEREAS, the City had previously formed an advisory committee, composed of less than a quorum of the City Council with a limited subject matter jurisdiction, to review proposals regarding City-owned lands and make recommendations to the full City Council regarding the same before its disestablishment on or before December 31, 2026; WHEREAS, the City now considers it necessary and desirable to establish a standing committee, as contemplated under Government Code section 54952(b), with continuing subject matter jurisdiction for ongoing review of proposed uses, leases, and dispositions and issue recommendations for the use, lease, or disposition of City-owned lands; WHEREAS, this standing committee would be tasked with providing a more strategic approach to maximizing the community benefits of City-owned lands, focusing on reviewing proposed uses, leases, and dispositions and providing recommendations that align with the City’s broader goals for economic development, community well-being, and public space optimization; and
WHEREAS, this standing committee would be beneficial by providing valuable insight to inform decisions by the full City Council, ensuring transparency, public engagement, and strategic use of City assets.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKEPORT:
SECTION 1. A standing committee entitled the City Lands Advisory Committee is hereby established to be comprised of two (2) City Council members as appointed by the Mayor and the City of Lakeport pursuant to the annual mayoral appointment process for commissions, boards, and committees.
SECTION 2. The City Lands Advisory Committee is charged with reviewing proposed uses, leases, dispositions, and related agreements of City-owned properties that align with the City’s broader goals for economic development, community well-being, and public space optimization. The City Lands Advisory Committee will meet as needed to review proposals and make recommendations to the full City Council. The City Lands Advisory Committee will not have the authority to make final decisions regarding the use or disposition of City property or lease 423349.1
agreements. The City Lands Advisory Committee shall have such support from the City Attorney and other City staff as the City Manager shall direct.
SECTION 3. The City Lands Advisory Committee shall provide its recommendations to the City Council from time to time as particular proposals are brought forward for its review and consideration.
SECTION 4. The establishment of the City Lands Advisory Committee is not a project subject to the California Environmental Quality Act (CEQA) pursuant to sections 15378(b)(5) and 15061(b)(3) as it is an organizational activity of government that will not result in direct or indirect physical changes in the environment.
SECTION 5. If any section, subsection, subdivision, sentence, clause, or phrase in this Resolution or any part thereof is for any reason held to be unconstitutional or invalid, ineffective by any court of competent jurisdiction, such decision shall not affect the validity or effectiveness of the remaining portions of this Resolution or any part thereof. The City Council hereby declares that it would have adopted each section irrespective of the fact that any one or more subsections, subdivisions, sentences, clauses, or phrases be declared unconstitutional, invalid, or ineffective.
SECTION 6. This Resolution take effective immediately upon adoption.
SECTION 7. The City Clerk shall certify to the passage and adoption of this Resolution in accordance with applicable law.
PASSED AND ADOPTED by the City Council of the City of Lakeport, County of Lake, State of California on this 16th day of December, 2025, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINING:
______________________________
Kim Costa, Mayor
Attest:
________________________
Kelly Buendia, City Clerk
Meeting Date: 12/16/2025 Page 1 Agenda Item # VII.E.1.
CITY OF LAKEPORT
City Council
City of Lakeport Municipal Sewer District
Lakeport Redevelopment Successor Agency
Lakeport Industrial Development Agency
Municipal Financing Agency of Lakeport
STAFF REPORT
RE: Sewer Main Repair – Martin St. MEETING
DATE:
12/16/2025
SUBMITTED BY: Paul Harris, Utilities Director
PURPOSE OF REPORT: Information only Discussion Action Item WHAT IS BEING ASKED OF THE CITY COUNCIL/BOARD:
The City Council is being asked to award a Purchase Order/Contract Agreement to Miskis Services Inc. to slip line an existing 8” sewer main.
BACKGROUND/DISCUSSION:
During construction of the 2024 pipeline project, a 200’ section of 8” DI sewer main on Martin St was identified as needing replacement due to the age of the pipeline. This could not be reasonably accomplished with trenching due to the numerous storm drain conflicts in the immediate vicinity. As a result, all service laterals were rerouted beyond the conflicts leaving the aged section as only a flow through main which transitions into the newly installed pipeline.
After the completion and video inspection of the newly installed pipe, it was decided that a slip line for this section of pipe was the most cost-effective solution to greatly extend the life of this segment. The existing DI pipe was structurally sound so an interior lining would be almost equivalent to a newly installed pipe and eliminate all potential points of I&I from the abandoned laterals.
Miksis Service Inc. was requested to assess and provide a quote for this slip line segment. Miskis is the only contractor in our region qualified to perform this type of work. The Dynaliner thermoformed PVC pipe is the only material capable of this type of transition which is proprietary to this contractor, which resulted in a sole source bid. They have performed several other point repairs, manhole rehabilitations, and slip line installations in our collection system over the years.
OPTIONS:
1. Authorize City Manager to signa Purchase Order/Contract with Miksis Services to perform a slip line of 200’ on Martin St for $26,360.
2. Provide other direction to staff.
FISCAL IMPACT:
None $26,360 Budgeted Item? Yes No
Budget Adjustment Needed? Yes No If yes, amount of appropriation increase: $26,360.
Meeting Date: 12/16/2025 Page 2 Agenda Item # VII.E.1.
Affected fund(s): General Fund Water OM Fund Sewer OM Fund Other:
COUNCIL PRIORITIES:
☐ Priority #1: Public Safety & Crisis Response
☒ Priority #2: Disaster Resiliency
☒ Priority #3: Good Governance & Fiscal Stability
☒ Priority #4: Capital Infrastructure Improvement
☐ Priority #5: Safe, Sustainable & Attractive Neighborhoods ☐ Priority #6: Economic Development
Comments:
SUGGESTED MOTIONS:
Move to authorize the City Manager to execute a purchase order/contract agreement with Miksis Services for 200’ of slip line in the amount of $26,360.
Attachments: 1. Miskis Services Proposal
Quote 3768
Dba Rapid Rooter
P.O. Box 591-I, Healdsburg, CA 95448-0590
1-888-UNPLUGU (707) 433-8053 FAX (707) 433-8085
Email: [email protected] Website: www.unplugu.com
Contractor’s License 544530, A, C-36, HAZ, D6, D12
GM | l m Page 1 | 1
November 21, 2025
Paul Harris
City of Lakeport
591 Martin St.
Lakeport, CA 95453
Office - (707) 263-5615
Cell - (707) 264-9870
[email protected]
Jobsite: 260 Martin St, Lakeport
Scope of work: Trenchless pipeline rehabilitation
Miksis Services, Inc. (MSI) proposes to rehabilitate 200’ of sanitary sewer on Martin St. The line segment is comprised of 43’ of 10” C900 PVC and 157’ of 8” ductile iron pipe. MSI will install an 8” Dynaliner thermoformed seamless PVC pipe liner that will “jump size” from the transition between the 8” and 10” diameters. After installation, one 4” service lateral in the 10” section will be reinstated. All lateral connections in the 8” section will remain covered by the pipe liner.
Equipment, Materials, & Labor
Total $26,360.00
Conditions and Assumptions:
• MSI will be allowed unlimited and uninterrupted access to the job site. • Costs associated with permit(s), bond(s), and license(s) are excluded. • No retention will be held.
• Any changes, modifications, or additions to this scope of work will require a change order. • MSI will set up a temporary sewer bypass during the pipe liner installation. • A post-video and report will be submitted to the client for review and acceptance. • Traffic control and flaggers will be provided by others. • This job is bid at a prevailing wage.
Thank you for the opportunity to present our proposal for this project. Please contact us if you have any questions or comments. This quote will remain valid for 15 days.
Gary Miksis
President
Miksis Services, Inc.
Authorized Signature for Bid Acceptance Date