271
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES It is expressly understood and agreed by both parties that CONSULTANT, while engaged in carrying out and complying with any of the terms and conditions of this Agreement, is an independent contractor and not an employee of the CITY. CONSULTANT expressly agrees not to represent, at any time or in any manner, that CONSULTANT is an employee of the CITY.
5) Billings
CONSULTANT' Sbills shall include a list of all tasks, a total amount due, the amounts previously billed, and the net amount due on the invoice. Except as specifically authorized by CITY, CONSULTANT shall not bill CITY for duplicate services performed by more than one person. In no event shall CONSULTANT submit any billing for an amount in excess of the rates or the maximum amount of compensation provided in section ( 2) for either task or for the entire Agreement, unless modified by a properly executed change order. 6) Advice and Status Reporting
CONSULTANT shall provide the CITY with timely reports, orally or in writing, of all significant developments arising during performance of its services hereunder, and shall furnish to CITY such information as is necessary to enable CITY to monitor the performance of this Agreement.
7) Assignment of Personnel
CONSULTANT shall assign only competent personnel to perform services pursuant to this Agreement. If CITY asks CONSULTANT to remove a person assigned to the work called for under this Agreement, CONSULTANT agrees to do so immediately, without requiring the City to process a reason or explanation for its request. The services shall be performed by, or under the direct supervision, of CONSULTANT' sAuthorized Representative: Daniel Leary, PE. CONSULTANT shall not replace its Authorized Representative without the prior written approval by the CITY.
8) Assignment and Subcontracting
It is recognized by the parties hereto that a substantial inducement to CITY for entering into this Agreement was, and is, the professional reputation and competence of CONSULTANT. Neither this Agreement nor any interest therein may be assigned by CONSULTANT without the prior written approval of CITY' Sauthorized representative.
CONSULTANT shall not subcontract any portion of the performance contemplated and provided for herein, other than the subcontractors noted in the proposal, without prior written approval of the CITY' Sauthorized representative. 9) Insurance
On or before beginning any of the services or work called for by any term of this Agreement, CONSULTANT, at its own cost and expense, shall carry, maintain for the duration of the Agreement, and provide proof thereof that is acceptable to the CITY the insurance specified in subsections ( i) through ( c) below with insurers and under forms of insurance satisfactory in all respects to the CITY. CONSULTANT shall not allow any subcontractor to commence work on any subcontract until all insurance required of the
272
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES CONSULTANT has also been obtained for the subcontractor. Verification of this insurance shall be submitted and made part of this Agreement prior to execution. a) Workers' Compensation. CONSULTANT shall, at CONSULTANT' Ssole cost and expense, maintain Statutory Workers' Compensation Insurance and Employer' s Liability Insurance for any and all persons employed directly or indirectly by CONSULTANT. Said Statutory Workers' Compensation Insurance and Employer' s Liability Insurance shall be provided with limits of not less than one million dollars ($ 1, 000,0) each accident or disease. In the alternative, CONSULTANT may rely on a selfinsurance program to meet these requirements provided that the program of self- insurance complies fully with the provisions of the California Labor Code. The insurer, if insurance is provided, or the CONSULTANT, if a program of self- insurance is provided, shall waive all rights of subrogation against the CITY for loss arising from work performed under this Agreement.
b) Commercial General Liability Insurance. CONSULTANT, at CONSULTANT' Sown cost and expense, shall maintain commercial general liability insurance for the period covered by this Agreement in an amount not less than two million dollars ($ 2, 000,0) per occurrence, four million dollars ($ 4, 000,0) general aggregate, and two million dollars 2, 000,0) products and completed operations aggregate for risks associated with the work contemplated by this Agreement. The general aggregate limit shall apply separately to the project or location of the work to be performed under this Agreement or the general aggregate limit shall be doubled. Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Agreement. Coverage shall be at least as broad as Insurance Services Office ( ISO) Commercial General Liability occurrence form CG 00 01.
Each of the following shall be included in the insurance coverage or added as an endorsement to the policy:
i) CITY, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to each of the following: liability arising out of activities performed by or on behalf of CONSULTANT, including the insider' s general supervision of CONSULTANT; ongoing operations using ISO form CG 20 10 ( or equivalent) and completed operations using ISO form CG 20 37 ( or equivalent) of CONSULTANT; premises owned, occupied or used by CONSULTANT. The coverage shall contain no special
limitations on the scope of protection afforded to CITY, its officers, officials, employees, agents, or volunteers.
ii) The insurance shall cover on an occurrence basis, and not on a claim made basis.
iii) An endorsement must state that coverage is primary insurance and
273
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES that no other insurance or self- insurance affected by the CITY will be called upon to contribute to a loss under the coverage. iv) Coverage shall provide and be endorsed to include a waiver of subrogation in favor of the City and its officers, officials, employees, agents, and volunteers.
v) Any failure of CONSULTANT to comply with reporting provisions of the policy shall not affect coverage provided to CITY and its officers, officials, employees, agents, and volunteers.
vi) Insurance is to be placed with California -admitted insurers with a Best' s rating of no less than A: VII.
vii) Notice of cancellation or non -renewal must be received by CITY at least thirty days prior to such change.
c) Automobile Liability Insurance.
CONSULTANT, at CONSULTANT' Sown cost and expense, shall maintain automobile liability insurance for the period covered by this Agreement in an amount not less than two million dollars ($ 2, 000,0) each accident, combined single limit coverage for risks associated with the work contemplated by this Agreement. Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from the use of owned, hired, and non -owned automobiles under this Agreement.
Coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 00 01 ( ed. 12/ 90) Code 1 ( any auto).
Each of the following shall be included in the insurance coverage or added as an endorsement to the policy:
i) CITY, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds.
ii) Coverage shall provide and be endorsed to include a waiver of subrogation in favor of the City and its officers, officials, employees, agents, and volunteers.
iii) Insurance is to be placed with California -admitted insurers with a Best' s rating of no less than A: VII.
iv) Notice of cancellation or non -renewal must be received by CITY at least thirty days prior to such change.
d) Professional Liability. CONSULTANT, at CONSULTANT' Sown cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing work pursuant to this Agreement in an amount not less than Two Million Dollars
274
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES 2, 000,0) per claim made and per policy aggregate covering the licensed professionals' errors and omissions, as follows:
i) Any deductible or self -insured retention shall not exceed $ 150, 00 per claim.
ii) Notice of cancellation, material change, or non - renewal must be received by the CITY at least thirty days prior to such change shall be included in the coverage or added as an endorsement to the policy.
iii) The policy must contain a cross liability or severability of interest clause.
iv) The following provisions shall apply if the professional liability coverages are written on a claims made form:
1. The retroactive date of the policy must be shown and must be before the date of the Agreement.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Agreement or the work, so long as commercially
available at reasonable rates.
3. If coverage is canceled or not renewed and it is not replaced with another claims made policy form with a retroactive date that precedes the date of this Agreement, CONSULTANT
must provide extended reporting coverage for a minimum of five years after completion of the Agreement or the work.
The CITY shall have the right to exercise at the
CONSULTANT' Scost, any extended reporting provisions of the policy should the CONSULTANT cancel or not renew
the coverage.
4. A copy of the claim reporting requirements must be
submitted to the CITY prior to the commencement of any
work under this Agreement.
e) Deductibles and Self -Insured Retentions. CONSULTANT shall disclose the self -insured retentions and deductibles before beginning any of the services or work called for by any term of this Agreement. During the period covered by this Agreement, upon express written authorization of the CITY' s authorized representative, CONSULTANT may increase such deductibles or self -insured retentions with respect to CITY, its officers, employees, agents, and volunteers. The CITY' s authorized representative may condition approval of an increase in deductible or self -insured retention levels upon a requirement that CONSULTANT procure a bond guaranteeing payment of losses and related investigations, claim administration, and defense expenses that is satisfactory in all respects to each of them.
275
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON - CALL ARCHITECTURAL AND ENGINEERING SERVICES f)
g)
Notice of Reduction in Coverage. In the event that any coverage required under subsections ( a), (b), (c), or ( d) of this section of the Agreement is reduced, limited, or materially affected in any other manner, earliest
CONSULTANT
possible
shall
opportunity
provide
and
written
in no
notice
case
to
later
CITY
than
at
five (
CONSULTANT' S
5) days after
CONSULTANT is notified of the change in coverage.
In addition to any other remedies CITY may have if CONSULTANT fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, CITY may, at its sole option:
i) Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement;
ii) Order CONSULTANT to stop work under this Agreement or withhold any payment which becomes due to CONSULTANT
hereunder, or both stop work and withhold any payment, until CONSULTANT demonstrates compliance with the requirements hereof;
iii) Terminate this Agreement.
Exercise of any of the above remedies, however, is an alternative to other remedies CITY may have and is not the exclusive remedy for CONSULTANT' Sbreach.
10) Indemnification - CONSULTANT' SResponsibility
As to the CONSULTANT' S work hereunder, it is understood and agreed that ( a) CONSULTANT has the professional skills necessary to perform the work, (b) CITY relies upon the professional skills of CONSULTANT to perform the work in a skillful and professional manner, and ( c) CONSULTANT thus agrees to so perform.
Acceptance by CITY of the work performed under this Agreement does not operate as a release of said CONSULTANT from such professional responsibility for the work performed. It is further understood and agreed that CONSULTANT is apprised of the scope of the work to be performed under this Agreement and CONSULTANT agrees that said work can and shall be performed in a
fully competent manner in accordance with the
standard of care applicable to CONSULTANT' Sprofession.
CONSULTANT shall indemnify, defend, and hold CITY, its officers, employees, agents, and volunteers harmless from and against any and all liability, claims, suits, actions, damages, and causes of action arising out of any personal injury, bodily injury, loss of life, or damage to property, or any violation of any federal, state, or municipal law or ordinance, to the extent caused by the willful misconduct or negligent acts or omissions of CONSULTANT, its employees, subcontractors, or agents, or on account of the performance or character of this work, except for any such claim arising out of the negligence or willful misconduct of the CITY, its officers, employees, agents, or volunteers.
It is understood that the duty of CONSULTANT to indemnify and hold harmless includes
276
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES the duty to defend as set forth in Section 2778 of the California Civil Code. Acceptance of insurance certificates and endorsements required under this Agreement does not relieve CONSULTANT from liability under this indemnification and hold harmless clause.
This indemnification and hold harmless clause shall apply whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. CONSULTANT' saggregate liability hereunder shall be limited by CITY to 1, 000,00 regardless of the legal theory under which such liability is imposed. 11) Licenses
If a license of any kind, which term is intended to include evidence of registration, is required of CONSULTANT, its employees, agents, or subcontractors by federal or state law, CONSULTANT represents that such license has been obtained, is valid and in good standing, and CONSULTANT shall keep it in effect at all times during the term of this Agreement, and that any applicable bond has been posted in accordance with all applicable laws and regulations.
12) Business Licenses
CONSULTANT shall obtain and maintain a CITY of Lathrop Business License until all Agreement services are rendered and accepted by the CITY. 13) Termination
Either CITY or CONSULTANT may cancel this Agreement upon 30 days written notification to the other party. In the event of termination, the CONSULTANT shall be entitled to compensation for services performed to the effective date of termination; provided, however, that the CITY may condition payment of such compensation upon CONSULTANT' Sdelivery to the CITY of any or all documents, photographs, computer software, video and audio tapes, and other materials provided to CONSULTANT or prepared by or for CONSULTANT or the CITY in connection with this Agreement. 14) Funding
CONSULTANT agrees and understands that renewal of this agreement in subsequent years is contingent upon action by the City Council consistent with the appropriations limits of Article XIII ( B) of the California Constitution and that the Council may determine not to fund this agreement in subsequent years.
15) Notices
All contracts, appointments, approvals, authorizations, claims, demands, Change Orders, consents, designations, notices, offers, requests and statements given by either party to the other shall be in writing and shall be sufficiently given and served upon the other party if ( 1) personally served, (2) sent by the United States mail, postage prepaid, (3) sent by private express delivery service, or (4) in the case of a facsimile transmission, if sent to the telephone FAX number set forth below during regular business hours of the receiving party and followed with two ( 2) Days by delivery of a hard copy of the material sent by facsimile transmission. Personal service shall include, without limitation, service by delivery and service by facsimile transmission.
277
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES To City:
Copy to:
City of Lathrop
City Clerk
390 Towne Centre
Lathrop, CA 95330
City of Lathrop
Department of Public Works
390 Towne Centre
Lathrop, CA 95330
MAIN: ( 209) 941- 7430
FAX: ( 209) 941- 7449
To Consultant: Sanbell
7077 Koll Center Pkwy, Ste 210
Pleasanton, CA 94566
16) Miscellaneous
a) Consent. Whenever in this Agreement the approval or consent of a party is required, such approval or consent shall be in writing and shall be executed by a person having the express authority to grant such approval or consent.
b) Controlling Law. The parties agree that this Agreement shall be governed and construed by and in accordance with the Laws of the State of California.
c) Definitions. The definitions and terms are as defined in these specifications.
d) Force Majeure. Neither party shall be deemed to be in default on account of any delay or failure to perform its obligations under this Agreement, which directly results from an Act of God or an act of a superior governmental authority.
e) Headings. The paragraph headings are not a part of this Agreement and shall have no effect upon the construction or interpretation of any part of this Agreement.
f)
g)
Incorporation of Documents. All documents constituting the Agreement documents described in Section 1 hereof and all documents which may, from time to time, be referred to in any duly executed amendment hereto are by such reference incorporated in the Agreement and shall be deemed to be part of this Agreement.
Integration. This Agreement and any amendments hereto between the parties constitute the entire Agreement between the parties concerning the Project and Work, and there are no other prior oral or written agreements between the parties that are not incorporated in this Agreement.
278
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES h) Modification of Agreement. This Agreement shall not be modified or be binding upon the parties unless such modification is agreed to in writing and signed by the parties.
i) Provision. Any agreement, covenant, condition, clause, qualification, restriction, reservation, term or other stipulation in the Agreement shall define or otherwise control, establish or limit the performance required or permitted or to be required of or permitted by either party. All provisions, whether covenants or conditions, shall be deemed to be both covenants and conditions.
j) Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is void or unenforceable, the provisions of this Agreement not so affected shall remain in full force and effect. k) Status of CONSULTANT. In the exercise of rights and obligations under this Agreement, CONSULTANT acts as an independent contractor and not as an agent or employee of CITY. CONSULTANT shall not be entitled to any rights and benefits accorded or accruing to the City Council members, officers or employees of CITY, and CONSULTANT expressly waives any and all claims to such right and benefits.
I) Successors and Assigns. The provisions of this Agreement shall inure to the benefit of, and shall apply to and bind, the successors and assigns of the parties.
m) Time of the Essence. Time is of the essence of this Agreement and each of its provisions. In the calculation of time hereunder, the time in which an act is to be performed shall be computed by excluding the first Day and including the last. If the time in which an act is to be performed falls on a Saturday, Sunday or any Day observed as a legal holiday by CITY, the time for performance shall be extended to the following Business Day. n) Venue. In the event that suit is brought by either party hereunder, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of San Joaquin or in the United States District Court for the Eastern District of California.
o) Recovery of Costs. The prevailing party in any action brought to enforce the terms of this Agreement or arising out of this Agreement may recover its reasonable costs, including reasonable attorney' sfees, incurred or expended in connection with such action against the non - prevailing party. 17) Notice to Proceed
Prior to commencing work under this agreement, CONSULTANT shall receive a written Notice to Proceed" from CITY. A Notice to Proceed shall not be issued until all necessary bonds and insurances have been received. City shall not be obligated to pay CONSULTANT for any services prior to issuance of the Notice to Proceed.
279
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES 18) Signatures
The individuals executing this Agreement represent that they have the right, power, legal capacity, and authority to enter into and to execute this Agreement on behalf of the respective legal entities of the CONSULTANT and the CITY. This agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns.
280
CITY OF LATHROP - SANBELL
MASTER AGREEMENT FOR ON -CALL ARCHITECTURAL AND ENGINEERING SERVICES Approved as to Form:
Recommended for Approval:
Approved by:
CONSULTANT:
City of Lathrop
City Attorney
Salvador Navarrete Date
City of Lathrop
Public Works Director/ City Engineer
Brad Taylor
City of Lathrop
390 Towne Centre Drive
Lathrop, CA 95330
Date
Stephen Salvatore Date
City Manager
Sanbell
7077 Koll Center Pkwy, Ste 210
Pleasanton, CA 94566
Fed ID #
Lathrop Business License #
Signature Date
Print Name and Title
Signature Date
Print Name and Title
281
EXHIBIT " A "
INTELLIGENT
INFRASTRUCTURE
ENDURING
COMMUNITIES
sanbell
STATEMENT Of QUALI ( CATIONS
HECKER PASS/ STATE ROUTE 152 ROUNDABOUT • GILROY
November 5, 2025
Statement of Qualifications for
On -Call Professional Civil, Transportation, &
Utility Engineering Services
SUBMITTED TO:
Mr. Greg Gibson, PE
Senior Civil Engineer, City of Lathrop
390 Towne Centre Drive
Lathrop CA 95330
SUBMITTED BY:
Daniel Leary, P. E., PTOE, QSD, Managing Principal
7077
925. 685. 4569
Koll Center
I dleary@sanbell. com
Parkway, Suite 210 I Pleasanton, CA 94566
www. sanbell. com
282
Ta
Gf' fr' Por ng lot fir • 1 C MefCrt1
ole of Contents
1 INTRODUCTORY LETTER
Cover Letter
2 ORGANIZATION & APPROACH
Firm Profile
Team Member Resumes
3 CONSULTANT QUALIFICATIONS
Similar Projects
Awards
References
4 SCOPE OF WORK APPROACH
5 CERTIFICATE OF INSURANCE
FEES / BILLING RATES
1 4
5 19
25 26
27 31
Separate Submittal
sar tbell
283
sanbell
November 5, 2025
Mr. Greg Gibson, P. E.
Senior Civil Engineer
City of Lathrop
Public Works Department
390 Towne Centre Drive
Lathrop, CA 95330
Regarding: Statement of Qualifications for On - Call
Professional Civil, Traffic, Utility Engineering Services Dear Mr. Greg Gibson, PE,
Sanbell- Bay Area appreciates the opportunity to submit our qualifications to the City of Lathrop for On -Call Professional Civil, Traffic, Utility Engineering and Landscape Architectural Services. We are excited about the possibility for Sanbell to serve Lathrop residents and local business to effectively design safe and maintainable infrastructure and meeting City Council goals for the City -owned and operated facilities.
Firm History and On - Call Engineering Resources
Sanbell is located in Pleasanton & Concord CA and has served the area for the past 42 years. Sanbell currently has 35 on -call services agreements with Northern California cities and agencies. Our Team has extensive resources to meet the City of Lathrop on -call project timelines. Our local engineering leaders at Sanbell are supported our Team which includes the following resources: Sanbell has 14 western US offices, with 30O engineers and team members, and 150+ licensed professionals; all utilizing a Deltek Vantagepoint accounting and project management platform to forecast our company - wide resources and availability to ensure our projects stay on schedule.
Services Required for the RFQ
Sanbell Public Works engineers have the expertise and proficiency to design AC overlays, perform road widening, construct bicycle path facilities, install traffic circles, and execute traffic design. In addition, our team is equipped to conduct roadway assessments, develop utility infrastructure for water, sewer, and storm drain, site designs, and handle landscape projects. Also, Sanbell offers the ability to manage capital projects; prepare plans, specifications, and estimates for Capital Improvement Projects, assist with presentations and recommendations on transportation items to City staff or Administration. Our Team is also ready to provide surveying, concepts, engineering, drafting, cost estimates, and specifications for bidding and construction.
Intelligent Infrastructure, Enduring Communities,
1 284
Statement of Qualifications
On - Call Professional Civil, Traffic, Utility Engineering Services Further, our Team has the skills and background to provide feasibility studies, cost estimates, and cost/ benefit analysis, conduct constructability reviews, research existing records of utility companies and agencies, coordinate proposed improvements with existing field conditions, and prepare documentation for obtaining permits from relevant agencies. Moreover, Sanbell maintains the competence and track record to assist the Engineering Services Department and Planning Division with presentations and recommendations to city staff, administration, Planning Commission, and City Council, prepare traffic impact studies for the Engineering and Planning Division, and review development proposals and related traffic impact studies for the Engineering and Planning Division. In addition, our firm is prepared to provide technical support during bidding, participate in pre -bid meetings, prepare addenda, conduct bid analysis, and provide award recommendations.
Also, Sanbell has the qualifications and history to attend construction meetings, respond to RFIs and technical questions, review change orders, invoices, and schedules, and prepare record drawings. Further, we are adept and seasoned at reviewing CIP plans, grading plans, stormwater quality plans, and traffic control plans, as well as ensuring compliance with applicable codes, standards, and regulations.
SOQ Required Sections
List below are sections required in the RFQ:
t . , <: f i l : r ; t iori , 3i id i : „ - The proposal package includes a dedicated team for the City of Lathrop projects, detailing their professional backgrounds and relevant experience aligned with the City' sspecific needs. It describes our firm' s
capabilities and expertise in providing services
for each category listed, with resumes attached for key personnel. n( l Ft! > ;; y — The proposal package provides a list of available services, along with listings and descriptions of completed work that support the proposed service categories, including pages of sample projects and a detailed On -Call approach.
I it - The proposal package includes references from municipal agencies that can provide information on the quality of our services during the past two years. nf i . i nr Irrl_:ts 1 : i - It, I l t . r : : - Sanbell can confirm we have no recent, current, or anticipated contractual obligations that relate to similar work within the City of Lathrop which may have a potential to conflict with our work on future on -call tasks with the City. t, r , i r _ < < i t In‘ n - Sanbell acknowleges review of the City' s standard
contract for design professional services. We confirm that we will provide and maintain policies of insurance according to the contract. Upon review, we have no concerns with the standard contract and have not submitted a red - lined copy.
F i. i l l i i , t dt: r> In a separately sealed envelope, the proposal package provides a fee schedule including hourly rates and titles of staff.
t . . ;, i I„ ; , , , , , , , : - The Sanbell Team has included a sample insurance certificate in this proposal package.
2 285
Statement of Qualifications
On -Call Professional Civil, Traffic, Utility Engineering Services Our Key Team Members all have more than 5 projects
managed, similar in size and scope. The key team members availability is listed below. They are supported by an organization of 300 engineers, surveyors and team members:
Emma Schoenthal, PE
Amy Yang, PE
Manny Abucay, PE
Thomas Hodge, PE
Ben Wier, PE
Anoop Admal, PE
Erin Claunch, PTOE
Daniel Leary, PE, PTOE, QSD
Robert Broestl, PE
30% available
35% available
45% available
45% available
60% available
15% available
40% available
25% available
25% available
Please feel free to call me with any questions or comments at 925. 681. 4880 or at dleary@sanbell. com.
Thank your for time and consideration to review our qualifications for the City of Lathrop On -Call Engineering.
Sincerely,
Daniel Lea
Managing
ry P OE QSD
P ' cipal
3 286
FIRM PROFILE
A
We are SanbeII
gout San
Sanbell is built upon decades
worth of enduring, intelligent
infrastructure designed to
make our communities better.
Our founding firms: Bellecci
Associates, Sanderson
Stewart, Coleman Engineering,
Core Design, Jensen Design,
Summit Engineering may
have established roots 1000' s
of miles apart, but we all share
these values: honest hard work,
integrity, grit, and a spirit of
service. With Sanbell you have
access to a
large pool of industry
experts and technical leads.
Along with 300+ Cool, Smart,
Talented People
yell
Services
Sanbell offers these Design
Services for Cities, Town' s, and
Public Agencies
Ped/ Bike Safety Improvements
City Surveyor Services
Civil Infrastruct. Engineering
Community Planning
Const. Mgt./ Inspection
Green Infrastructure
Landscape Architecture
Multimod. Infrastruct. Eng.
Public Engagement
On -Call Services
Survey I Mapping I GIS
Traffic Engineering
Transportation Engineering
Utility Design, Operations
Visualization
Let' sGet Personal
We have been a fixture in Nor
Cal since 1983, with a portfolio
of 600+ CIP projects for Cities,
Towns, Counties, and Districts.
Our Team of engineers &
surveyors at Sanbell- Bay Area
have been dedicated to serving
our local communities for the
past 43 years, in all nine counties
of the Bay Area and extending
into the Valley. Our Team
members are local residents in
northern Calfornia
neighborhoods which extend
from Santa Rosa to South San
Jose, and from Cupertino to
Manteca.
CALIFORNIA I COLORADO I MONTANA I NEVADA I TEXAS I WASHINGTON Off ices
ACROSS
THE WEST
Sanbell Offices
lr<an
COOL, SMART,
TALENTED PEOPLE
Pr Off: SS1OI Ical
LICENSED/ CERTIFIED
PROFESSIONALS
sanbell
4 287
RESUMES
Daniel
Leary
Professional Registration
Professional Engineer
CA # 48394
PTOE: 3935 I QSD/ P: 24867
MBA: Cal State East Bay
Years Experience
27 / 25 years w/ Bellecci (dba
Sanbell)
Location
Pleasanton
Role
County Procedures
Contract, Billing
Back- up Project Manager
Direct Surveyors As Needed
Sub Coordination ( as -needed)
Close Coordination with
Project Manager
We were the Civil and/ or Survey Sub
Education
BSCE: California Polytechnic State
University, San Luis Obispo, CA
MBA: California State University
Hayward, Hayward, CA
sanbell
Intelligent Infrastructure Enduring Communities
Daniel has served as our Director for PW Projects for 25 years. He is a leader in complete streets, Class IV bike lanes, and green infrastructure projects. He received the APWA Nor Cal Transportation Mgr. of the Year award in 2021 and is currently a Planning Commissioner for an Alameda County City. Daniel has been at the forefront of innovative Green Street and Stormwater designs for 18+ years.
Bicycle/ Ped Safety/ Complete Streets
ADA in ROW Ph. I - IV Imp • City of Santa Clara
C. Costa Blv. Complete Streets • City of Pleasant Hill
Cycle 10 RRFBs - City of Suisun City
Galindo St. Class IV Bike/ Pave Rehab • Concord
Hillsdale Sta. Bike Gap Closure - City of San Mateo
Poplar Ave. Sidewalk Gap Close • City of Sunnyvale
Saratoga Av./ Prospect Rd. Compl. Sts • City of Saratoga Stevens Crk Blv. Class IV Bike • City of Cupertino
Pavement & Other Parking Lots
Diablo- DeLong Ave. Corridor Imp • City of Novato
Fairmont Ave. Pavement Rehab • Alameda Co. PW
Fremont Ave. Pave. Rehab. ( CIR) • City of Los Altos
I - House Parking Lot • UC Berkeley
Lawrence Hall of Science Parking Lot • UC Berkeley
Maxwell Family Field Parking Garage* • UC Berkeley
Orchard Garden Park Parking Lot • City of Sunnyvale
Plaza 3 Parking Lot/ Driveways • City of Los Altos
Stormwater & Storm Drainage
Bernal Park Det. Basins/ SD • City of Pleasanton
Bowers Park Greener Parking Lot • City of Santa Clara
Burlingame Ave. Rain Gardens • City of Burlingame
Clark Kerr Campus Storm Drain Imp • UC Berkeley
E. 14th St. GSI/ Corridor Imp. - Alameda Co PW
Green Infra./ SD Drainage • City of Suisun City
Green Parking Lot F Pilot Project • UC Merced
Hope Dr. Green Stormwater Imp • City of Santa Clara
Middlefield Rd. Rain Garden/ Ped Imp. • Redwood City
Mission Blvd. GSI/ Corridor Imp. • Alameda Co PW
San Pablo Av. Streetscape/ Raingardens • El Cerrito
San Tomas/ Monroe St. Green Pkg Lot • Santa Clara
Green Parking Lot ( Burlingame) • SFPUC
Stanton Ave Rain Garden/ Ped Imp. • Alameda Co PW
Transit Mobility Hub 8c. Green Parking Lot - STA
Intelligent
Infrastructure.
Enduring
Communities.
sanbell 5
288
RESUMES
Anoop
Admal
Professional Registration
Professional Engineer
CA # 76008
Years Experience
20 / 19 years with Bellecci ( dba
Sanbell)
Location
Pleasanton
Role
Review PS& E
Constructibility Review
Alternatives Development
Conformity to County Standards
Lead QA/C Reviewer
We were the Civil Sub
sanbell
Intelligent Infrastructure Enduring Communities
Mr. Admal is one of our most in demand Engineers. He has been a a QSD/SP for over a decade. Locally, he was the Project Project Manager for the recently completed Contra Costa Blvd./ Taylor Blvd. Corridor and Intersection Improvement project, for the City of Pleasant Hill.
Education
MSCE: Univ. of Memphis, Memphis, TN
BSCE: Osmania University, India
Bicycle/ Ped Safety/ Complete Streets
ADA in ROW Ph. I - IV Imp • City of Santa Clara
C. Costa Blv. Complete Streets • City of Pleasant Hill
Cycle 10 RRFBs • City of Suisun City
Diablo- DeLong Ave. Corridor Imp • City of Novato
Downtown Bike/ Pd. Imp • City of Concord
E. 5th St./ Vecino Ped. Imp • City of Benicia
Galindo St. Class IV Bike/ Pave Rehab • Concord
Hillsdale Sta. Bike Gap Closure • City of San Mateo
Miramonte Ave. Complete Streets • City Mtn. View
Perry Park Transpo. Improve.. City of Sunnyvale
Poplar Ave. Sidewalk Gap Close • City of Sunnyvale
Saratoga Av./ Prospect Rd. Compl. Sts • City of Saratoga Stevens Crk Blv. Class IV Bike • City of Cupertino
Transit Mobility Hub ( S. City) • Solano Transp Auth
Pavement
Cleveland Ave. Pavement Rehab • City of Albany
E. Cypress Rd. Pave. Rehab./ Widen • City of Oakley
Fairmont Ave. Pavement Rehab • Alameda Co. PW
Fremont Ave. Pave. Rehab. ( CIR) • City of Los Altos
Stormwater & Storm Drainage
Bernal Park Det. Basins/ SD • City of Pleasanton
Bowers Park Greener Parking Lot • City of Santa Clara
Burlingame Ave. Rain Gardens • City of Burlingame
E. 14th St. GSI/ Corridor Imp. • Alameda Co PW
Green Infra./ SD Drainage • City of Suisun City
Green Parking Lot F Pilot Project • UC Merced
Green Parking Lot ( Burlingame) • SFPUC
Hope Dr. Green Stormwater Imp • City of Santa Clara
Middlefield Rd. Rain Garden/ Ped Imp. • Redwood City
San Pablo Av. Streetscape/ Raingardens • El Cerrito
San Tomas/ Monroe St. LID • City of Santa Clara
Stanton Ave Rain Garden/ Ped Imp. • Alameda Co
Transit Mobility Hub & Green Parking Lot • STA
Virginia St. Streetscape/ Raingardens • Vallejo
Intelligent
Infrastructure.
Enduring
Communities
sanbell 6
289
RESUMES
Thomas
Hodge
Project rvi
Professions
Professional Registration
Professional Engineer, CA
82792
QSD/ P
Years Experience
13 / 2 years with Sanbell
Location
Concord/ Remote
Role
Project Manager Resource
Schedule and Budget
Prepare Specifications
Prepare Cost Estimates
Site visits, field investigations
Meetings w/ clients, stakeholders
Hydrology/ Hydraulic Analysis
and Reports
SWPPP
Education
BSCE: Brigham Young University,
Provo, UT
Pavement & Water combined into one
project
Non Sanbell projects
sanbell
Intelligent Infrastructure Enduring Communities
Thomas is a highly -skilled civil engineer with extensive knowledge in all phases of development and public works engineering design. His 13 years of expertise drives projects to on -time delivery, within scope, and on budget. Thomas is self -motivated, detail oriented, and performs well under pressure. He has a proven ability to consistently navigate through complex land use and design - related issues. His skills include the ability to effectively coordinate with public agencies, other consultants, and internal staff to meet client' sneeds. He also is fluent in Spanish, which will be beneficial for open houses and community meetings in some Northern California communities that we serve.
Sanitary Sewer Rehabilitations
2025 Urgent Sewer Spot Repairs • City of Berkeley
66th St. Sewer Repair & Extension • City of Berkeley
California St. Sewer Realignment - City of Berkeley
Sacramento St. Sewer Extension/ Bypass • Berkeley
Shattuck Av/deline Sewer Rehab • City of Berkeley
Virgina/ Parker St. Sewer Rehab • City of Berkeley
Cordelia Rd. Sewer Main - Suisun City **
Crystal Springs Sewer Main Repair • City San Bruno
Foster Road Sewer Repair • Napa Sanitation Dist.**
I-80 Central Ave Widen/ Sewer Realign • City Richmond** Knightbridge Pave/ Sewer/ Wtr • City of American Canyon Pueblo Ave. Sanitary Sewer Imp. • Napa Sanit. Dist.**
Wappo Ave Sewer Rehab• City of Calistoga**
30+ Sewer Rehabs • Napa Sanitation District**
Other Experience
2024 Annual Pavement • City of San Carlos
2023 Pavement Maintenance • City of Millbrae
2023 Annual Pavement • City of San Carlos
2022-3 Street Rehabilitation • City of San Bruno
Alberta Way Pave. Rehab Project • City of Concord
Pavement Maint. Project 2L • City of Concord
Pavement Maint. Project Ph E. • City of Concord
Villa Terrace/ Bellevue Street Rehab • San Mateo
sanbell 7
290
Emma
Schoenthal
Project Man
Profession sl r
Professional Registration
Professional Engineer, CA
96789
RESUMES
sanbell
Intelligent Infrastructure Enduring Communities
Emma is a gifted engineer, successful Project Manager, who is a known for her ability to successfully coordinate key issues with stakeholders during design. Her experience includes design of improvements for our most recent Green Stormwater projects, complete streets, and pavement rehabilitation. She is passionate about projects that improve the environment.
Years Experience
7/ 7yearswith Bellecci ( dba Sanbell)
Location
Pleasanton
Role
Lead PM/ Day- to- Day Contact
Invoicing, Schedule
Budgets, Community Mtgs.
Direct Surveyors As Needed
Sub Coordination ( as -needed)
Close Coordination with
Client
Implement
Project
QA/C
Manager/ s
Education
Bachelor of Science,
Environmental Engineering
Univ. of California, San Diego
We were the Civil and/ or Survey Sub
RWC = Redwood City & Sts = Streets
Bicycle/ Ped Safety/ Complete Streets
ADA in ROW Ph. I - IV Imp • City of Santa Clara
C. Costa Blv. Complete Streets • City of Pleasant Hill
Cycle 10 RRFBs • City of Suisun City
Diablo- DeAnza Ave. Corridor Imp • City of Novato
Downtown Bike/ Pd. Imp • City of Concord
E. 5th St./ Vecino Ped. Imp • City of Benicia
E. 14th St. Class IV Complete Streets • ACPWA
Galindo Street Class IV Bike/ Pave Rehab • Concord
Hillsdale Sta. Bike Gap Closure • City of San Mateo
Mission Blvd. Class IV Bike/ Complete Streets • ACPWA
Middlefield Road Complete Streets • Redwood City
Perry Park Transportation Improve.. City of Sunnyvale
Poplar Ave. Sidewalk Gap Closure • City of Sunnyvale
Saratoga Av./ Prospect Rd. Compl. Sts • City of Saratoga Stanton Ave. Complete Streets • Alameda Co. PW
Stevens Creek Blvd. Class IV Bike • City of Cupertino
Transit Mobility Hub ( S. City) • Solano Transp Auth
Pavement
Campanile Way Pavement Rehab • UC Berkeley
Cleveland Avenue Pavement Rehabilitation • Albany
Crittenden/ Shoreline BI. Pave. Rehab • Mtn. View
E. Cypress Rd. Pave. Rehab./ Widen • City of Oakley
Fremont Ave. Pave. Rehab. (CIR) • City of Los Altos
West Circle Pavement Rehab • UC Berkeley
5 m
to
m
7 F
11 Utilities/ Storm Drainage
in
2025-6 Water Main Ext. • City of Martinez c
2025 Citywide Waterline Imp. (35k LF) • City of Sunnyvale c 2022-3 Water Main Ext. • City of Martinez m
Antoinette UG OH Utilities/ R20 • City of South SF m
Ave. 3- 1 Water/ Sewer Improvements • City of San Bruno a Bay Point Sewer Point Repairs • Delta Diablo Sanit. Dist - I.
City Park Storm Drain Channel • City of San Bruno to
E. Cypress Rd 14" Sewer Force Main • City of Oakley o
Green Infra./ SD Drainage • City of Suisun City 3
Middlefield Rd. Stormwater Planters • Redwood City 3
San Tomas/ Monroe St. LID • City of Santa Clara* 7
Stanton Ave. Stormwater Planters • Alameda Co. PW
Transit Mobility Hub Storm Drain • Solano Transp. Auth. sanbell 8
291
RESUMES
Amy
Yang
Prof. Eng s
Associate
Professional Registration
Professional Engineer
CA # 90849
PMP: 3440753
Years Experience
7 / 7
years with Bellecci ( dba
Sanbell)
Role
Lead Engineer
Schedule and Budget
Design of Improvement Plans
Prepare Specifications
Prepare Cost Estimates
Meetings w/ clients, etc.
We were the Civil and/ or Survey Sub
sanbell
Intelligent Infrastructure Enduring Communities
Amy is one of the Bay Area Division' s most valuable Engineers and Project Managers who epitomizes our next generation of high caliber engineers and leaders. She passed her PE exam quicker than most in our firm' s 40+ year history. To expedite a time consuming task, Amy utilized her advanced Excel skills to create a custom formula to automate a previous manual data entry task for a Rule 20 project. Amy earned her PMP® certification which requires a minimum of 4500 hours of project management experience.
Education
MSCE: University of Illinois,
Urbana - Champaign, IL
BSCE: University of Illinois, UrbanaChampaign, IL
Bicycle/ Ped Safety/ Complete Streets
ADA in ROW Ph. I - IV Imp • City of Santa Clara
C. Costa Blv. Complete Streets • City of Pleasant Hill
Cycle 10 RRFBs • City of Suisun City
Diablo- DeAnza Ave. Corridor Imp • City of Novato
Downtown Bike/ Pd. Imp • City of Concord
E. 5th St./ Vecino Ped. Imp • City of Benicia
E. 14th St. Class IV Complete Streets • ACPWA
Galindo St. Class IV Bike/ Pave Rehab • Concord
Hillsdale Sta. Bike Gap Closure • City of San Mateo
Mission Blvd. Class IV Bike/ Compl. Streets • ACPWA
Middlefield Road Complete Streets • Redwood City
Miramonte Ave. Complete Streets • City Mtn View
Perry Park Transportation Improve.- City of Sunnyvale
T Intersect. Median Safety Imp • City of Suisun City
Poplar Ave. Sidewalk Gap Close • City of Sunnyvale
Saratoga Av./ Prospect Rd. Compl. Streets • City of Saratoga Stanton Ave. Complete Streets • Alameda Co. PW
Stevens Creek Blvd. Class IV Bike • City of Cupertino
Transit Mobility Hub ( Suisun City) • Solano Transp Auth Pavement
Cleveland Ave. Pavement Rehab • City of Albany
Creeks Trail Pave. Maint. IRehab • City of Santa Clara
E. Cypress Rd. Pave. Rehab./ Widen • City of Oakley
Fairmont Ave. Pavement Rehab • Alameda Co. PW
Fremont Ave. Pave. Rehab. ( CIR) • City of Los Altos
West Circle Pavement Rehabilitation • UC Berkeley
Utilities/ Oher
2025 Citywide Waterline Imp. • City of Sunnyvale
2022-3 Water Main Ext. • City of Martinez
2019-0 Citywide Waterline Imp. • City of Sunnyvale
Antoinette UG OH Utilities/ R20 • City of South SF
Ave. 3- 1 Water/ Sewer Improvements • City of San Bruno El Monte Fire Station Rule 20A • Town of Los Altos Hills Green Infra./ SD Drainage • City of Suisun City
Lincoln Ave. Emerg. Waterline • City of Sunnyvale
San Tomas/ Monroe St. LID • City of Santa Clara*
Intelligent
Infrastructure.
Enduring
Communities
sanbell 9
292
RESUMES
Robert
Broestl
Princip En
QA/C
Professional Registration
Professional Engineer
CA # 41828
Years Experience
30+ / 19 years with Bellecci
dba Sanbell)
Location
Concord
Role
Project Management
City Procedures
Contract, Billing
Oversee Design
Direct Surveyors As Needed
Manage Subs ( if needed)
Close Coordination with
Project Manager/ s
Education
BSCE: The Ohio State University
Columbus, OH
Pending Council Approval
won APWA Nor Cal ' 24 Project of Yr
11. sanbell
Intelligent Infrastructure Enduring Communities
Mr. Broestl is the most experienced engineer at Sanbell, and he leads our Concord office Public Works Department. Robert is our in- house expert for constructability, and designing pavement rehabilitation, maintenance, and sanitary sewer projects. Robert typically directs field reviews with our design groups, develops design alternatives, QA/C, and provides project management. Of note, Robert has been working on local projects for 20+ years, including managing our On -Calls with the Cities of Walnut Creek, Concord, and Hercules.
Complete Streets/ Pavement Rehab**
2020 Annual Pave Rehab. • City of San Carlos
2023 Annual Pave. Rehab. • City of San Carlos
Alberta Way Pave. Rehab / SRTS • City of Concord
Caltrain Corridor Ped. Imp. Ph II • City of San Bruno
Dublin Blvd. Complete Streets • City of Dublin
Meadow Ln./ Market St. Paving/ SRTS • City of Concord
Measure Q Pave. Rehab. • City of Concord
New Railroad Ave. Pave. Rehab • City of Suisun City
Residential Pave. Maint. Project 2L • City of Concord
Residential Pave. Maint. Phase E • Concord
San Carlos Ave. Traffic Calming • City of San Carlos
San Pablo Ave./ SR 123 Rain Gardens • City of El Cerrito So. Decoto Green Streets Ph I - II • City of Union City Treatment Plant Pave Rehab • Delta Diablo Sanit. Dist.
W. Leland Pavement Mgt. • City of Pittsburg
Utilities
Adobe Creek Sewer ( Dir. Drill) • City of Los Altos
2018 Sanitary Sewer WW219/ 11 • City of Los Altos
Structural Reach CAR A Sewer • City of Los Altos
Broadway Water Main Replace. • City of Millbrae
Taylor Blvd. Sewer/ Water Realign. • City of Millbrae
Hillcrest Basin Sewer Project • City of Millbrae
Diamond Blvd./ Willow Pass Sewer • City of Concord
Whitman Rd. Sanitary Sewer • City of Concord **
Local & Other Projects
Manor Water/astewater Rehab • City of Brentwood*
Brentwood Blvd. Medians • City of Brentwood
3rd/ Railroad New Mecca Frontage Imp. • City of Pittsburg 12 Sewer Rehabs PIC ( CM) • Las Gallinas Vly. Sanit. Dist. 20+ On - Call Projects ( 2006-4) • City of Mill Valley
Alhambra Ave. Sidewalk Gap Closure • City of Martinez
Big Break/ Main St. Bus Stop Project • City of Oakley
Citywide Street Sign Replacements • City of Oakley
Country Hills Dr. Soundwall Replacement • City of Antioch Old Town Plaza/ SD Improvements • City of Pittsburg
Sidewalk Gap Closure • City of Cotati
Intelligent
Infrastructure.
Enduring
Communities
asanbell 10
293
RESUMES
k4; ii
Erin
Claunch
Assoc. PI inci
Dir. o(P: I_; ,
Rocky
Professional Registration
Professional Eng. (MT) #65742
PTOE: # 2862
Institute of Asset Mgt.
Certification # 275317647
Years Experience
20/ 4years with Bellecci ( dba
Sanbell)
Location
Billings
Role
Senior Project Manager
Signals/ Lighting
Schedule and Budget
Meetings with Designers
Oversee Creation of Traffic PS& E
Plan Checks
QA/C
Professional/ Civic Affiliations
Institute of Transp. Engineers
ITE), Intermountain Section,
Assoc. Member, 2O15 - present
Section President, 2018-019
ITE Montana Chapter, Chapter
President/ Board Member,
2010-012
sanbell
Intelligent Infrastructure Enduring Communities
Erin oversees the firm' s team of multidisciplinary designers of fed, state, infrastructure projects ( MT). From 2008-1, he worked for the City of Billings Public Works, most recently as the City Traffic Engineer where he managed the Traffic Engineering Bureau, staff, and all traffic -related tasks within the City. His duties included site plan review, traffic study review, traffic engineering project management, and citizen complaints. Erin is experienced at preparing PS& E for large municipal multimodal and roadway geometric projects, assisting in design of traffic signals, traffic calming devices, and the electrical elements. He is assisting Sanbell Bay Area on a half dozen current public sector projects in CA.
Experience
City of Billings Safe Routes to School Update Ph. 2, Billings, MT City of Bozeman Fowler Ave. Corridor Connection, Bozeman, MT MT State University Grant Street Pedestrian Mall, Bozeman, MT Kagy Blvd. Signal & Ped. Hybrid Beacon, Bozeman, MT
City of Bozeman Griffin Drive from 7th to Rouse Reconstruction, Manley Griffin Intersection Improvements, Bozeman, MT
MDT/ City of Bozeman Kagy Blvd. So. 19th to Willson, Bozeman, MT
19th & Lincoln ADA Crossing and Pedestrian Hybrid Beacon, Bozeman, MT
City of Belgrade W. O. 22- 03 Dry Creek Road, Cruiser Lane, Spooner Road Roundabout, Belgrade, MT
City of Billings Overlay Striping, Billings, MT
City of Billings 4th Avenue North and Poly Drive Overlay Striping, Billings, MT
City of Billings W. O. 23- 10 48th and Grand Signal Improvements, Billings, MT
City of Billings W. O. 21- 42 SBURA Gravel Streets Improvements, Phase 1, Billings, MT
Lockwood Pedestrian Safety District and Non -motorized
Plan Update, Yellowstone County, MT
Yellowstone Co. On -Call Traffic Engineering Services, Billings, MT City of Billings Riverfront Park Trail, Billings, MT
City of Great Falls On -Call Plan Review, Great Falls, MT Yellowstone County 56th & Hesper Rd. Roundabout, Billings, MT City of Billings Elysian Road/ Annafeld Parkway Roundabout, Billings, MT
Education
BSCE: Montana State University,
Bozeman, MT ( 2OO3)
m
cii
m
z
CA
o
c
n
c
m
m
a
ta
o
3 3
c
5 y
sanbell 11
294
RESUMES
Manny
Abucay
A oci to P; in
Senior i oicc
Professional Registration
Professional Engineer
CA # 87131
Years Experience
20/ 19 years with Bellecci ( dba
Sanbell)
Location
Concord
Role
Lead PM/ Day- to- Day Contact
Project Management
City Procedures
Contract, Billing
Oversee Design
Direct Surveyors and Design
Staff As Needed
Manage Subs ( if needed)
Close Coordination with
Project Manager/ s
Education
BSCE: University of Santa Clara,
Santa Clara, CA
Pending Council Approval
won APWA Nor Cal ' 24 Project of Yr
11 sanbell
Intelligent Infrastructure Enduring Communities
Manny is an Associate Principal known for his outstanding reliability and client management skills. He frequently manages CIP projects for pavement rehab/ repair/ maintenance, wet utility rehabs, ADA curb ramps, traffic calming/ SRTS, and complete streets. His calm demeanor and dependability are valued by both our employees and clients. One of the sewer rehab projects he managed won an APWA 2024 POY Award. Of most relevance to this contract, Mr. Abucay has been working on many of our recent ( Contra Costa County) projects over the past five years. This includes experience from CIP projects for the Cities of Berkeley, Concord, Hercules, and Pittsburg over the past five years.
Complete Streets/ Pavement Rehab**
2024 Annual Pave Rehab. • City of San Carlos
2023 Annual Pave. Rehab. • City of San Carlos
2020 Annual Pave. Rehab. • City of San Carlos
Alberta Way Pave. Rehab / SRTS • City of Concord
Caltrain Corridor Ped. Imp. Ph II • City of San Bruno
Dublin Blvd. Complete Streets • City of Dublin
Hendy Ave. Pave Rehab/ Complete Streets • Sunnyvale
Meadow Ln./ Market St. Paving/ SRTS • City of Concord
Measure Q Pave. Rehab. • City of Concord
New Railroad Ave. Pave. Rehab • City of Suisun City
Notre Dame Pavement Rehab • City of Belmont
Old Bayshore Hwy. Pavement Rehab • Millbrae
Residential Pave. Maint. Project 2L • City of Concord
Residential Pave. Maint. Phase E • Concord
San Carlos Ave. Traffic Calming • City of San Carlos
So. Decoto Green Streets Ph I - II • City of Union City St. Francis Dr. Pavement/ Ped Safety Imp. • Petaluma
Treatment Plant Pave Rehab • Delta Diablo Sanit. Dist.
W. Leland Pavement Mgt. • City of Pittsburg
Utilities
2018 Sanitary Sewer WW219/ 11 • City of Los Altos
Adeline St/hattuck Sewer Rehab • City of Berkeley
Adobe Creek Sewer ( Dir. Drill) • City of Los Altos
Broadway Water Main Replace. • City of Millbrae
Diamond Blvd./ Willow Pass Sewer • City of Concord
Hillcrest Basin Sewer Project • City of Millbrae
Structural Reach CAR A Sewer • City of Los Altos
Taylor Blvd. Sewer/ Water Realign. • City of Millbrae
Virgina/ Parker St. Sewer Rehab • City of Berkeley
Whitman Rd. Sanitary Sewer • City of Concord **
Other Projects
Manor Water/astewater Rehab • City of Brentwood*
Ethel Ave. Drainage Improve/ Slop Stab. • Mill Valley
Intelligent
Infrastructure.
Enduring
Communities.
sanbell 12
295
RESUMES
Clynton
Hebert
Engino 1
Education
BSCE: University of Nevada,
Reno, NV
Years Experience
12+ / 1. 5
years with Bellecci ( dba
Sanbell)
Location
Concord
Role
Drafting
Plan & Profiles
Utility Coordination
Layout & Grading
Hydrology & Hydraulic Calcs
C3 & Stormwater Design
ADA Design
Pavement & Water Main Reh
combined in one project
Pavement 84. Sewer Rehabs
combined into one project
Subconsultant to geotech eng.
sanbell
Intelligent Infrastructure Enduring Communities
Clynton is a self motivated professional with proven leadership skills.
He brings a deep breadth of knowledge gained from over a decade of work with other engineering companies, including an ENR Top 10 Design Firm. He also earned the distinguished Eagle Scout award from the Boy Scouts of America. Clynton has prepared permit applications requiring approval from city, county and highway officials. He has a strong background in site and utility design, grading plans, water quality control, drainage reports, structural plans, wastewater and water developments, transportation and road reconstruction, civil site, demolition, and structural.
Pavement / Roadway Improvements
2024 Pavement Rehab • City of San Carlos
2023-4 Annual Pavement Rehab • City of San Bruno
Brittan Ave./ San Carlos Ave. Sidewalks • City of San Carlos Landing Ln. Pavement Rehab • City of Millbrae
Knightsbridge Pave. Rehab • City of American Canyon
Residential Pave. Maintenance Zone 2L • City of Concord Residential Pave. Maint. Ph E • City of Concord
STBG Brace Road Paving Project • Town of Loomis
Utility Design & Other
Broadway Water Main Replace. • City of Millbrae
Knightsbridge Water Main* • City of American Canyon
Landing Ln. Sewer Rehab • City of Millbrae**
Lindsy Dr. Site Improvements • Private Client
Sidewalk Gap Closure Project • City of Cotati
Wally Wackander/ Memorial/ Ward Creek Trail Repair
Hayward Area Rec & Park District (HARD)*** Intelligent
Infrastructure.
Enduring
Communities
sonbell 13
296
RESUMES
Edmond
Tsui
Professional Registration
Engineer in Training
Years Experience
5/ years with Bellecci ( dba
Sanbell)
Location
Pleasanton
Role
Base Mapping/ Drafting
Utility Coordination
Notification to Utility Co' s
Specifications
Technical/ Admin. Assistance
1. sanbell
Intelligent Infrastructure Enduring Communities
Edmond is an exceptional Engineer who has demonstrated his versatility, dependability, and he is a previous direct hire Engineering Technician for the City of Palo Alto. His expertise includes collection of GIS data, maps database updates, layout for water services using AutoCAD Map Civil 3D. He is experienced with working on utility design projects for Cities, Counties, and other agencies in the SF Bay Area. Below is a representative
sampling of his relevant experience.
Education
BSCE: San Jose State University
Bicycle/ Ped Safety/ Road Improvements
2022 Street Resurfacing Project • City of Milpitas
ADA in ROW Citywide Imp. • City of Santa Clara
C. Costa Blvd. Bike/ Pd. Improve.. City of Pleasant Hill Cleveland Ave. Pavement Rehab. • City of Albany
Creek Trails Pavement Rehab • City of Santa Clara
Diablo- DeAnza Corridor + Pave. Rehab • City of Novato
East Cypress Rd. Pavement + Widening • City of Oakley
Downtown Bike/ Pedestrian Improve • City of Concord
Galindo Pavement Rehab • City of Concord
Middlefield Rd. Class IV Bike Complete Sts • Red. City
Mission Blvd. Class IV/ Complete Streets • ACPWA
Mounument Blvd. Pavement Rehab • City of Concord
Ped. Controlled Crosswalk ( HAWK) • City of Patterson
Peery Park Transportation Improve. • City of Sunnyvale
Slurry Seal Package 2-A • City of San Mateo
T- Intersection Improvements • City of Suisun City
Transit Mobility Hub ( S. City) • Solano Transp Auth
West Circle Pavement Rehabilitation • UC Berkeley
Utility Projects
2025 Citywide Waterline Improve • City of Sunnyvale
2023 Citywide Waterline Improve • City of Martinez
2019-0 Citywide Waterline Imp. • City of Sunnyvale
Avenues 3- 1 Wtr./ Sewer Main Imp. • City of San Bruno
Campus Pressure Zone Water Mains • UC Berkeley
E. Cypress Utility Improvements • City of Oakley
El Monte Fire Station 20 Project • Los Altos Hills
Lincoln & Edgemont Water Main • Jefferson USD
Mission Blvd. UUD Project • ACPWA
Mission Road Rule 20 Project • So. SF
Quiet Zone Improvement • City of San Mateo
Underhill Parking Garage EV Charger • UC Berkeley
W. Olive Ave. Waterline Replacement • City of Sunnyvale Intelligent
Infrastructure.
Enduring
Communities
R sanbell 14
297
RESUMES
Nella
Desruisseaux
Assistant En= inr; r I
Years Experience
3.5/.years w/ Bellecci ( dba
Sanbell)
Location
Pleasanton
Role
Base Mapping/ Drafting
Utility Coordination
Notification to Utility Co' s
Specifications
Technical/ Admin. Assistance
We were the Civil and/ or Survey Sub
Education
MSCE: University of California,
Berkeley, CA
BSCE: Wentworth Institute of
Technology, Boston, MA
11. sanbell
Intelligent Infrastructure Enduring Communities
We are thrilled that Ms. Desruisseaux has joined the Sanbell family.
She is an extremely bright Engineer who is working towards her PhD.
As a child, Nella used to accompany her father, also a civil engineer, on field site visits growing up in Haiti. This is where she first developed a passion for civil engineering. Her education and training taught her how to find R -values for pavement rehabilitation projects, designing soil solutions for retaining walls and slope stabilization projects. Her most recent projects at have been for utilities, transportation projects, ADA ramps, and grading plans for a variety of CIP projects.
Bicycle/ Ped Safety/ Road Improvements
ADA in ROW Citywide Imp. • City of Santa Clara
Cleveland Ave. Pavement Rehab. • City of Albany
Contra Costa BI./ Taylor Imp. • City of Pleasant Hill
Creek Trails Pavement Rehab • City of Santa Clara
Diablo / DeLong Pavement/ Complete Streets • Novato
Downtown Bike/ Pd. Improvements • City of Concord
E. Cypress Widening # 247. City of Oakley
El Camino Real Buff Bike Lanes • City of San Mateo
Galindo Pavement Rehab • City of Concord
Green Infrastructure Imp. • City of Suisun City
Mounument Blvd. Pavement Rehab • City of Concord
Peery Park Transportation Imp. • City of Sunnyvale
Southside Complete Streets * • City of Berkeley
West Circle Pavement Rehabilitation • UC Berkeley
Utility Design & Other
2023 Water Line Replacements • Martinez, City of
Campus Pressure Zone Water Mains • UC Berkeley
Centennial SD Rehabilitation • UC Berkeley
Crystal Springs Road Rule 20 Project • San Bruno
Donner Path Doorway • UC Berkeley
El Monte UG Utility Dist. • Town of Los Altos Hills
Fallon Park Ph I I I Improve* • City of Dublin
Lawrence Hall of Science ADA • UC Berkeley
Lincoln & Edgemont Water Main • Jefferson USD
Mission Blvd. Rule 20 Project • ACPWA
Mission Road Rule 20 Project • So. SF
Oxford Fence Project • UC Berkeley
Richmond Field Sta. Stockpiles • UC Berkeley
Zellerbach Hall ADA/ Ramp • UC Berkeley
Intelligent
Infrastructure.
Enduring
Communities.
Rsonbell 15
298
RESUMES
Alex
Fong
Princip'-,
Prof. Larda ` a vor it
Professional Registration
Professional Land Surveyor
CA # 9252
sanbell
Intelligent Infrastructure Enduring Communities
Alexander has more than 3 decades of broad experience in boundary resolution, topography, GPS control and construction surveying. He has been in -charge of the union field survey crews and serves as our primary surveyor preparing Sanbell' s (formerly Bellecci) office survey maps. He skillfully coordinates between clients and engineers for deadlines during all phases of projects; from up -front mapping to final construction staking. Of note, he has been the PLS in Charge of the majority of the local and other projects listed on this proposal
Years Experience
33 / 33 years with Sanbell ( dba
San bell)
Location
Concord
Role
Survey Manager
Manage & Schedule Field Crew
Oversee Basemap Development
Resolve Field Survey Data
Locate Property Lines
Records Search
Stamp Final Topographic Survey
Establish and Monitor QA/C
Program
We were the Civil and/ or Survey Sub
Complete Streets & Related
ADA in ROW Ph. I - IV Imp • City of Santa Clara
Broadway Curb Ramp Imp • City of Redwood City
C. Costa Blv. Complete Streets • City of Pleasant Hill
Cycle 10 RRFBs • City of Suisun City
Diablo- DeLong Ave. Corridor Imp • City of Novato
Downtown Bike/ Pd. Imp • City of Concord
E. 5th St./ Vecino Ped. Imp • City of Benicia
Galindo St. Class IV Bike/ Pave Rehab • Concord
Mission Blvd. Imp. Const. Staking • Hayward
Miramonte Ave. Complete Streets • City Mtn View
Perry Park Transpo. Improve. City of Sunnyvale
Poplar Ave. Sidewalk Gap Close • City of Sunnyvale
Saratoga Av./ Prospect Rd. Compl. Sts • City of Saratoga Sidewalk Gap Closure • Cotati
Stevens Crk BIv. Class IV Bike • City of Cupertino
Transit Mobility Hub ( S. City) • Solano Transp Auth
T Intersect. Median Safety Imp. • City of Suisun City
Stormwater & Storm Drainage
Bernal Park Det. Basins/ SD • City of Pleasanton
Blanding Ln. Green Parking Lot • Private Client
Green Infra./ SD Drainage • City of Suisun City
Clark Kerr Campus Storm Drain Imp • UC Berkeley
E. 14th St. GSI/ Corridor Imp. • Alameda Co PW
Ethel Ave. Drainage Imp./ Slop Stab. • Mill Valley
Middlefield Rd. Rain Garden/ Ped Imp. • Redwood City
Mission Blvd. GSI/ Corridor Imp. • Alameda Co PW
San Pablo Av. Streetscape/ Raingardens • El Cerrito
San Tomas/ Monroe St. LID • City of Santa Clara
SF Water HQ LID Imp. (Burlingame) • SF Water
Stanton Ave Rain Garden/ Ped Imp. • Alameda Co
Virginia St. Streetscape/ Raingardens • Vallejo
Intelligent
Infrastructure.
Enduring
Communities.
R sanbell 16
299
RESUMES
Daniel
Takacs
Associate,
Survey Technician I i l
Professional Registration
Land Surveyor in Training, CA # 8999
Years Experience
8 / 8
years with Bellecci ( dba
Sanbell)
Location
Concord
Role
Computations: Survey Plat &
Record
Plat Preparation
Maintain Client Contacts
Boundary Analysis Calculations
Layout of Final Maps
Assist Land Surveying Manager
With Budgets & Schedules
Prepare Cutsheets Using Field
Data
Firm Leadership
Education
BA: Geography
California State University, Chico
We were the Civil and/ or Survey Sub
Not consecutive
11. sanbell
Intelligent Infrastructure Enduring Communities
Daniel is an LSIT, and graduate of California State University, Chico.
He studied geography and took coursework in remote sensing, field techniques, water resource policy and planning, and AutoCAD. His typical survey projects include creation of Topographic Surveys, Legal Descriptions, Plat Maps, Easement Maps, and updates of Final Maps for private development projects. He is proficient in the latest version of AutoCAD and has experience using ArcMap for GIS surveying projects, as well as Adobe Illustrator and Photoshop. Daniel has proven himself to be a dependable surveyor and is a quick learner. He was promoted to a firm Associate due to his outstanding performance.
Ped Improvements/ Roads/ Complete Streets
ADA in ROW Ph. I - IV Imp • City of Santa Clara
C. Costa BIv. Complete Streets • City of Pleasant Hill
E. 14th St. Class IV Complete Streets • ACPWA
Laurel Street Record of Survey • City of Los Altos
Peery Park Transportation Imp. • City of Sunnyvale
Saratoga Av./ Prospect Rd. Complete Sts. • City of Saratoga Stevens Crk BIv. Class IV Bike • City of Cupertino
Other
Bechtel Engineering Ctr. Renovation • UC Berkeley
Police Headquarters Building Topo • City of San Pablo
North Field Athletic Building Topo. Survey • UC Berkeley UVA Creekside ( Albany) Record of Survey • UC Berkeley
Vandengate Subdivision • Private
in Utilities
Whitman Rd. Sewer Improve. • City of Concord
Structural Reach Sewer ROW Survey • City of Los Altos
Fairview Waterline CIP # 592-9202 • City of Brentwood
7 CD
m
7 7
11 n
c
A
c
4-
c- 1;
m
a
c
CD
n
o
3 3
c
7 C'
N
sanbell 17
300
RESUMES
Dave
McMurdo
Party Ci i =
Professional Registration
Chief of Party
Years Experience
30 ( 30 years with Bellecci
dba Sanbell)
Location
Concord
Role
Primary Field Survey Crew
Locate Benchmarks
Survey Data Collection
Maintain Field Notes
Close Coordination with
Survey Manager & Technician/ s
We were the Civil and/ or Survey
Subconsultant
sanbell
Intelligent Infrastructure Enduring Communities
David first started with Bellecci close to three decades ago as a field surveyor and ascended to the position of Party Chief with Engineers and Operators Local 3. He has surveyed in extremely diverse and challenging locations, including waist deep bodies of water, on active railways, in marinas, along State Routes, in downtown shopping districts, at major universities, in City/ rural parks, and K- 12 campuses, military bases, and in locations with pollutant or contaminant sources. David' srole will be to collect field data such as visible utilities, as well as, location of structures, monuments, and site feature elevations needed to create topographic and other field surveying tasks.
Experience
Bernal Park Expansion • City of Pleasanton
Botanical Gardens Parking Lot • UC Berkeley
Lawrence Hall of Science Parking Lot • UC Berkeley
Maxwell Family Field Parking Garage* • UC Berkeley
Sustainable Parking Lot # F • UC Merced
Vasco ACE Train Station Parking Lot • City of Livermore Webster St. (SR 61)/ Willie Stargell • City of Alameda
Other Experience
Webster/ Willie Stargell Improve. • City of Alameda
Neptune Park Improvements • City of Alameda*
Tinker Avenue Improvements • City of Alameda
Marina Village Parkway Survey - City of Alameda
Mariner Square & Marina Vlg. Survey • City of Alameda _ Harbor Bay Ferry Terminal Parcel • City of Alameda
Alameda Map Ck. 11349 • City of Alameda
Marina Village Parkway Survey • City of Alameda
420 Grand LLA • City of Alameda
Esperanza Parking Lot • Alameda Housing Authority
Alameda Hotel Design & Survey • Private Client
H. A. R. D. • Palma Ceia Park Topo Survey
Mission Blvd. Construction Staking • City of Hayward
H. A. R. D. • Kenneth Aitken Center Topo Survey
H. A. R. D. • Greenridge Park Property Line Survey
H. A. R. D. • Palma Ceia Park Topo Survey
H. A. R. D. • Ward Creek/ Memorial Trail Damage*
Grant Non -potable Wtr. Const Staking • Brentwood
3 m
co'
m
J
D
fi
o
N
c
n
c
m
m
a
c
o
o
3 3
c
D
tit
nl sonbell 18
301
SIMILAR PROJECTS
Construction: $ 17M
Completed: Winter 2022
Roadvay
Construction: $ 1.M
Completed: 2022
Roadway
Construction: $ 5.M
Completed: (Substantially) 02/ 25
Construction: $ 1. 2M
Completed: Winter 2022
F, loth Cut tidol Improvements/ Pavement Rehab We were
selected to design and provide surveying for approx. 1 mile of complete streets and pavement rehabilitation on this regional corridor. The project includes Class IV protected bike lanes, new sidewalks, curb, driveway conforms, artwork, and pedestrian safety improvements. E. 14th also featured bulb -outs, raised curb medians, and improved sidewalks/ crosswalks.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
Alameda County Public Works Agency
Amber Lo, Deputy Director
510- 670- 5485 I amberl@acpwa. org
Hecker Pass/ SR 152 Roundabout We were selected to design and provide surveying for this State Route roundabout with solar -powered speed feedback signs, rumble strips, and a flashing signal light to alert drivers to slow down. Our design protected both edges of a drainage ditch and constructed a bike exit into the adjacent Class I trail. The project was a collaboration with the City, Caltrans, and a developer.
Key Staff: Leary, Admal, Fong
City of Gilroy
Gary Heap*, PE, PW Project Mgr.
408 • 399. 5773 (* Mr. Heap is now Town Eng. for Los Gatos) Monument Blvd. Pavement Rehab We designed and surveyed
this major City Arterial. It features asphalt concrete grinding/ removal, asphalt concrete installation, rubberized AC, dig out repairs, utility cover lowering, restoring to grade, survey monumentadjustments, curbramp & sidewalk improvements
at select locations, pedestrian pushbutton relocations, traffic striping and markings.
Key Staff: Leary, Admal, Schoenthal, Fong
City of Concord
Aldrich Bautista, PE, Project Mgr.
925- 671- 3028 Ialdrich. bautista@cityofconcord. org
Fremont Avenue Pavement Rehabilitation We were selected to design and provide surveying for 1 - mile+ of pavement rehab. along this main arterial for the City. This OBAG project rehabilitated a 4, 200 LF segment, and added complete streets treatments for this project.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of Los Altos
Aida Fairman, PE, Public Works Director
650. 947. 280 I afairman@losaltosca. gov
Intelligent
Infrastructure.
Enduring
Communities.
sartbell 19
302
SIMILAR PROJECTS
Construction: $ 4. 8M (est).
Completed: Fall 2024
i
Construction: $4.9M
Completed: 2022
Construction: $5. 4M (est).
Completed: Fall 2024
Construction: $ 587k
Completed: Spring 2022
2023 Annual Pavement Rehab ( C941G 23) We were selected to design various pavement rehab methods. We investigated quantified pavement failures, non - compliant ADA ramps, and prepared a
report w/ repair options. Final PS& E includes
2", 3", 3.5" & 5" AC grind, 6" deep base repairs, ADA curb ramps, valley gutters, PCC sidewalk, driveways, striping, and signing.
Key Staff: Broestl, Abucay, Boyer, Fong, Choy, Hebert
City of San Carlos
Evan Cai, Project Manager
650- 82- 4196 I ecai@cityofsancarlos. org
2022 Annual Pavement Rehab ( 09416) We were selected to design various pavement rehab methods for approx. 5 miles of various treatments, including 3.5" AC Grind & Inlay, 6" Base Repairs. Work included ADA curb ramp improvements
for compliance, replacement or repair of damaged concrete curbs, gutters and sidewalks, grinding and/ or overlay of asphalt concrete pavement section.
Key Staff: Broestl, Abucay, Boyer, Fong, Choy, Hebert
City of San Carlos, Evan Cai, Project Manager
650- 82- 4196 I ecai@cityofsancarlos. org
2022-3 Street Rehab Project Management, Design, & Survey to rehab pavement on approx. 4. 13 miles of city streets, and Caltrans permit, and basis of design report. The rehabilitation methods included drainage improvements, 6"- 8" AC grind,
2.5" and 3.5" AC inlay/ overlay, 6" deep asphalt concrete base repair, over 2, 900 LF of PCC curb ramps, 1, 706 SF of PCC sidewalks, & driveways.
Key Staff: Broestl, Abucay, Boyer, Fong, Choy, Hebert
City of San Bruno
Dalia Manaois, PE, Principal Civil Engineer
650-16- 7047/ 650-16- 7065 Idmanaoissanbruno. ca. gov
New Railroad Avenue Pavement Rehabilitation
Project Management, Design, & Survey for pavement rehab a 2" asphalt concrete pavement overlay, as well as pavement grinding, full depth asphalt repair, adjusting utility covers to grade, replacing pavement markings/ striping, and ADA curb ramps. The City complimented us for our high quality plans and how the project was " nearly perfect".
Key Staff: Broestl, Abucay, Boyer, Fong
City of Suisun City
Nick Lozano, Project Manager
707. 421 • 7344 I nlozano@suisun. com
Intelligent
Infrastructure.
Enduring
Communities
sanbell 20
303
SIMILAR PROJECTS
Construction: $ 6. 09M ( low bid)
Completed: Summer 2023
Construction: $ 3. 5M est.
Completed: in Const. 02/ 25
Construction: $ 1. 47M
Completed: in Construction 02/ 25
Construction: $ 10M
Completed: Spring 2024
2020/.1 Citywide Annual Waterlines We were selected to design approximately 15K lineal feet of water mains, at 11 City- wide locations, including valves and fire hydrants; tie- in of new mains to existing mains, replacement of service laterals up to existing water meters, and replacement of non - radio -read water meters. We are also designing the City' s
2025 Water
Main project, approximately 36k LF.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of Sunnyvale
Marlon Quiambao, PE, Project Manager
408 • 730 • 2751 1 mquiambao@sunnyvaleca. gov
2023 Water Main Extension We were selected to design approx. 8, 500 LF of water main to address undersized, aging, and deteriorating pipelines. The project consists of water main replacement, valves, fire hydrants, tie- in of new mains to existing mains, replacement of laterals up to existing water meters, blow -offs, air release valves, fittings, and associated appurtenances. We are also designing their 2025 Water project.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of Martinez
Joe Enke, PE, Public Works Director
925. 372 • 3524 I jenke@cityofmartinez. org
Pressue Reducing Stations/ Water Mains We were selected to survey and design upgrades at five campus locations.
Scope included preparing PS& E and cost estimates for the installation of above ground back -flow preventers ( BFP), where possible, adjacent to existing underground water system vaults on campus. Additional work involved field meetings with UC Berkeley staff to review the proposed site plans, and type of BFP proposed. Key Staff: Leary, Admal, Schoenthal, Fong UC Berkeley Capital Projects
Don Irby, Project Mgr.
510 • 664 . 49291 dirby@berkeley. edu
Avenues 3 1 Sewer & Water Mains We were selected to survey and design this large utility improvement project. It featured 6, 700 LF of water pipeline and 6, 500 LF of sewer pipeline for the following segments: 4360 LF of 6", 1720 LF of 8", and 1030 Lineal feet (LF) of 14".
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of San Bruno
Dalia Manaois*, PE, Principal Civil Engineer
650-16- 7047/ 650-16- 7065Idmanaoissanbru no. ca. gov
Original reference is no longer w/ the City)
Intelligent
Infrastructure.
Enduring
Communities
sonbell 21
304
SIMILAR PROJECTS
Construction: $ 1. 8M est.
Completed: Winter 2023
Construction: $ 1. 4M ( low bid)
Completed: Summer 2022
Construction: $4. 5M
Completed: 2024
Construction: $ 2. 6M
Completed: Summer 2021
First St. Sewer Sy,> tcm Repair W0100121 We were selected to design relocatation/ realign the sewer main in downtown to the center of the street. Part of sewer was under existing sidewalk, or near curb & gutter. We designed approx. 1, 500 LF of 8" SDR- 26, new manholes, 20 laterals, & sewer bypass system. The project improves maintenance access, clearances between existing utilities, and can accommodate future street improvements.
Key Staff: Broestl, Abucay, Boyer, Fong, Choy, Hebert
City of Los Altos
Aida Fairman, PE, Public Works Director
650. 947. 2780 I afairman@losaltosca. gov
Misc. Sewer Rehabilitation Project
Project Management, Design, 84, Survey for approx. 5, 700 LF sewer pipeline in multiple citywide locations. This included trenchless & open trench construction to install new manholes, laterals, sewer segments in 6" & 8" size, and abandon in place 970 LF of 6" main.
Key Staff: Broestl, Abucay, Boyer, Fong
City of Millbrae
BiII Giang*, PW Dept.
Mr. Giang now works for the City of Mountain View
bill. giang@mountainview. gov 1650. 903. 6276
Virginia & Parker Street Sanitary Sewer Rehab
Project Management, Design, & Survey for approx. 6, 900 LF of high priority capacity sewer upsizing and rehabilitation of approximately 5, 000 LF of sanitary sewer mains. One sewer segment crosses San Pablo Avenue ( SR 123). This project required close coordination with Caltrans, BART, and EDMUD.
Key Staff: Broestl, Abucay, Boyer, Fong, Hodge, Hebert
City of Berkeley
Felix Meneau, Project Manager
510 • 981 • 6399 I fineneau@berkeleyca. gov
Sewer System Repair Structural Reach: W00100119/ W219
Project Management, Design, & Survey to upsize 6" pipes to 8", and 8" to 12". The project utilized HDPE pipe and the pipe reaming method. Approximately 5, 044 LF of improvements were built at 14 different citywide locations. We prepared a Basis of Design Report at 65%. A topo survey and coordination with the geotechnical engineer were also part of our scope.
Key Staff: Broestl, Abucay, Boyer, Fong
City of Los Altos
Aida Fairman, PE, Public Works Director
650. 947. 2780 I afairman@losaltosca. gov
m
cfl'
m
4-
5 N
c
n
c
m
m
7 a
c
co
o
3 3
z
sanbell 22
305
SIMILAR PROJECTS
Construction: $ 768k
Completed: 11/ 24
Construction: $ 1.M
Completed: Spring 2024
Construction: $328k (low bid)
Completed: Spring 2022
Construction: $ 380k
Completed: 2023 ( Design)
Greran Infrarstr ucture/ Am itak Parr k Ride:
We were selected to provide Project Management, Design, & Survey for green stormwater bioretention/ trash capture for this
3. 6 ac lot in the Caltrans ROW. It will improve quality of stormwater entering the Suisun Marsh.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of Suisun City
Nick Lozano, Project Manager
707. 421 •7340 I nlozano@suisun. com
Arroyo Seco Storrs Drain Irnp We were selected to provide Project Management, Design, & Survey for approx. 800 LF of new storm drain pipe, and replace existing sewer pipe and waterline. The project included pavement rehab for the section of street where the utility work was performed. The project will reconfigure the storm drain inlet, storm drain manhole and pipe on Arroyo Seco.
Key Staff: Broestl, Abucay, Boyer, Fong, Choy, Hebert
City of Millbrae: Bill Giang*, PW Dept.
Mr. Giang now works for the City of Mountain View
bill. giang@mountainview. gov1650. 903 •6276
2020 Annual Storm Di a3inage Imp. (C9S31 20) Wewere selected to provide Project Management, Design, & Survey for for five locations: Arguello Park/ Carmelita Dr. / Roland Ave./ Brittan Ave./ and El Camino Real ( SR 82). We designed improvements to: storm drain channels & headwall; SD inlets & pipes; storm drain system; and a rear yard drain with road improvements to maintain the existing storm drain system.
Key Staff: Broestl, Abucay, Boyer, Fong
City of San Carlos
Evan Cai, Project Mgr. (orig. PM no longer w/ City)
650- 82- 4196 1 ecai@cityofsancarlos. org
Clark Kerr Campus Building 25 Storni Dr rin; rge: We designed solutions to address ground water seepage and surface
runoff into old buildings. The design called for a
joint
trench along the bottom of the large slope with perforated and solid pipes, in addition to surface drainage ditches and inlets. A solider pile wall system was designed to allow for waterproofing of an adjacent building.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
UC Berkeley - Capital Projects
Jim Wert, Project Manager
510. 292 • 0322 I jwert@berkeley. edu
CD
cn
m
5 o
tn
c
n
c
m
m
z
a
c
n
o
3 3
41 sonbell 23
306
SIMILAR PROJECTS
Construction: $ 811k
Completed: Winter 2019
Construction: $ 250k
Completed: Spring 2024
2024 STA Safety Project of Year
Ped/ Bile F< cHH
SRTS/ Cycle 10 RRFB Ped. Solely Improvement', We were
selected to survey and design 3 non -signalized crossing locations near Suisun Elementary and Dan 0 Root Health & Wellness Academy. The project is installing RRFB, high- vis crosswalks, warning signs, bulbouts, and ADA Ramps. An
increase in pedestrian awareness was needed to improve
safety at the pedestrian crossings near schools.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of Suisun City
Nick Lozano, Project Manager
707. 421. 7340 I nlozano@suisun. com
ADA in the ROW: Ph I IV We were selected to survey and design approx. 350 ADA barrier removals near Levi' s Stadium, home for the 2026 Super Bowl. The project featured business parks, a VTA light rail stop. 200+ sites were enhanced w/ sidewalks, ADA curb ramps, driveways, asphalt repairs, ped. street crossings, parking lots, landscaping, rail crossings, and traffic signals.
Key Staff: Leary, Admal, Yang, Schoenthal, Fong
City of Santa Clara
Vincent Luchessi, Senior Civil Engineer
408) 615- 3012 I vluchessi@santaclaraca. gov
Construction: $ 11. 4M (all 4 phases)
Completed: Ph I: 09/ 22 I Ph II: 02/ 23 I Ph III & IV: Fall 2023 Middlefield Rd. Complete Streets/ Sidewalk Level Bikeway We were selected to survey and design complete streets, pavement rehab, bicycle/ pedestrian safety, and create a Rule 20A UUD.
The bike/ ped improvements features an RRFB, half mile
long sidewalk level, separated bike route, bicycle detection, accessible pedestrian signals, and emergency vehicle
preemption system. The Rule 20A phase was constructed
separately. Key Staff: Leary, Admal, Yang, Schoenthal, Fong City of Redwood City
Mr. Peter Delgado, City Project Manager
Construction: $ 8M( St.) / $ 7. 6M ( R20) 650 • 780 • 7373 I pdelgado@redwoodcity. org Completed: Spring 2021 ( Street)
Pedic;.
Stevens Creek Blvd, Class IV Bikeway: We designed new
Class IV bike lanes, intersection bulbouts, curb returns, curb ramps, raised buffer island, and signal modifications at three intersections. This quick -build type project was partly funded by Apple, Inc. to improve multi -model access to their spaceship" Cupertino campus. We implemented quick build measures to reduce construction costs and traffic impacts on this arterial. Key Staff: Leary, Admal, Yang, Schoenthal, Fong City of Cupertino
John Raaymakers, PE, PW Project Mgr.
408 • 777. 3100 I johnr@cupertino. org
5 m
co'
m
7 o
c
n
c
fo
m
c
co
n
o
3 3
c
N
sonbell 24
307
AWARDS
Belmont, City of
Belmont Pavement Rehabilitation 2015
2016 APWA Silicon Vly Project of the Year
Sustainable/ Gren $2M -$ 5M)
Burlingame, City of
Burlingame Avenue Streetscape Project *
2015 APWA Silicon Vly Project of the Year
Sustainable/ Gren $5M -$ 25M)
Easton AdditioniRay Park Sewer Rehab CM- Phil
2018 APWA Silicon Vly Project of the Year
Utilities <$ 2M)
Concord, City of
Ellis Lake Park New Playground/ Restrooms
2018 APWA Northern CA ( Structures <$ 5M)
Whitman Road SS - Project of the Year
Davis, City of
Third St. Corridor/ Complete Streets Project *
2019 APWA Sac. Project of the Year
Transportation/ Streetscape)
El Cerrito, City of
San Pablo Ave. ( SR 123) Rain Gardens &
Streetscape: 2012*
2012 ICMA Program Excellence Award In
Community Sustainability
Santa Clara, City of
San Tomas Expressway / Monroe Street New
Park Project *
2019 APWA Silicon Vly Project of the Year
Environmental/ Parks )
Suisun City
Cycle 10/ SRTS
Safety Project of the Year
Solano Transportation Authority (STA)
November 2024
Highway Beautification Project ( Hwy. 12)
Project Delivery of the Year
Solano Transportation Authority ( STA)
November 2024
Sunnyvale, City of
Hendy Avenue Complete Streets and Pavement
Rehabilitation ( Fed. funded)
2016 APWA Silicon Vly Project of the Year
Transportation $ 2M -$ 5M)
Orchard Gardens Park Expansion*
2016 APWA Silicon Valley Honor Award
Environmental/ Parks<$ 2M)
University of California, Berkeley
CA Memorial Stadium Seismic Renovation*
Best of the Best Projects" - ENR Magazine: 2013
ENR Best Sports/ Enertai. Project: 2013
SCUP/ AIA Excellence In Arch. Honor
Award: 2013
Berkeley Design Advocates Award For
Design Excellence
Vallejo, City of
Downtown Streetscape Phase I - Ill
10+ Blocks)
Solano Transportation Authority, TLC
Award: 2013
CYCLE 10 SAFE ROUTES TO SCHOOL •. SUISUN CITY
Intelligent
Infrastructure.
Enduring
Communities
Rsanbell 25
308
City of Patterson
Tiffany Rodriguez, Capital Projects Manager
tirodriguez@ci. patterson. ca. us
City of Suisun City
Nick Lozano, Project Manager
nlozano@suisun. com
City of Redwood City
Mr. Peter Delgado, City Project Manager
pdelgado@redwoodcity. org
City of Saratoga
Mr. Macedonia Nunez, PE, Project Manager
mnunez@saratoga. ca. us
City of Oakley
Billilee Saengchalern, Engineering Manager
saengchalern@ci. oakley. ca. us
City of Santa Clara
Vincent Luchessi, Senior Civil Engineer
vluchessi@santaclaraca. gov
City of Los Altos
Aida Fairman, PE, Public Works Director
afairman@losaltosca. gov
City of San Carlos
Vatsal Patel, Project Mgr.
vpatel@brentwoodca. gov
Mr. Patel Now works for the City of Brentwood)
209. 85.075
707. 421 •7344
650 • 780 • 7373
408 • 868 • 1218
925. 625 . 7154
408. 615. 3012
650. 947. 2780
925 • 516 . 5307
Intelligent
Infrastructure.
Enduring
Communities.
sonbell 26
309
SCOPE OF WORK APPROACH
Below is the general and approach and methods Sanbell will follow for a typical On -Call Project. This
narrative, along with a project specific scope of work and approach, will be adjusted after we receive a TBD On -Call task order and confirm details about the project and the City goals.
Methodologies
Design Base Map and Field Survey
Sanbell will provide field surveying and base mapping for the On -Call Project. We have in- house Local 3 union field surveyors with more than 20 years of experience, utilizing the latest Trimble total station and GPS field survey equipment. Our surveyors will use GPS to establish the project survey control from our subscribed California GNSS network ( or another method as determined by the surveyor). The CAD drawing will be completed by office survey staff under the direction of a PLS.
The field surveying will commence after an online aerial the up -front design of the project. This step will finalize survey is mapped in CAD, to be used for
the limits of work in preparation for the
field surveying. Following
preliminary layout preparation
by the design team, focused
topographic survey points will
be collected at select project
areas to capture surface
conforms identified by the
engineer. Items included in
the supplemental survey may
include street corners, ground
shots, trees ( over 6" diameter),
fences, visible utilities, edges
of concrete hardscape, surface -
evident utilities, top -of -curb
locations, inlet dips, and
other critical locations. The
supplemental topographic
survey CAD file will include
annotations, topographic
points with elevations, street
names, north arrow, scale, basis
of bearing, and the Sanbell
standard border.
Right -of -Way Mapping Process
As part of the topographic survey mapping, the Sanbell survey department will perform right- of- way mapping research. Our survey department will use Parcel Quest or similar tools to download record maps. Approximate property line locations will be added to the project survey base map using street widths, aligning property lines at the back of walk, centerline setbacks, and fences. Since this project does not anticipate right- of- way acquisition, the property lines will be shown using the best available information. We will also review maps received from the City to include street right- of- way lines in CAD.
Intelligent
Infrastructure.
Enduring
Communities
nl sanbell 27
310
SCOPE OF WORK APPROACH
Utility Letters and Mapping
Sanbell will prepare utility letters with an attached project utility mapping limits -of -work exhibit.
Some utility request letters will be prepared on City letterhead to minimize fees for utility mapping.
Sanbell will coordinate with utility owners, including City -owned facilities, within the project limits to obtain copies of their utility base maps. Existing utility locations from available record information will be added to the base map. Sanbell will conduct field reconnaissance of the project limits as part of the engineer' s
field investigation, in combination with the field survey crew. The utility notes will state actions required by the contractor or utility company.
Engineering and Design
30% Design - Establishing Design Solutions and Projected Costs Successful public works projects begin with an early understanding of and stakeholder buy -in for the proposed engineering solution, project limits, and anticipated construction costs. As the design consultant, the Sanbell Team will develop a clear preliminary design plan supported by alternatives analysis, with enough detail to communicate the recommended design to the City project manager and stakeholders. The design team will present the recommended design and costs to the City project manager for approval before proceeding to the 30% design phase. The 30% design phase will include preliminary site investigations and utility evaluations. PDF format design layouts at 1" = 10' scale will be prepared for easier review.
Community Meeting Approach
The community meeting presentation will focus on informing attendees about the City' s efforts to
notifythe public, the meeting' spurpose, and methods forsubmittingfeedback. Keytopicswill include project goals, budget, funding source, schedule, limits of work, design overview, and construction impacts. The presentation will consist of 10-
15 slides, followed by a Q&A session and an
open house for detailed discussions.
Recommended approach:
1. mild()[,, A30 -minute informal
period for attendees to speak with the
design team and City staff before the
presentation.
2. ; id ' I : I i op A revolving slide show
of key project details displayed before
the presentation.
3. F'<< I - I,: A 15 - min. session
covering project goals, purpose, public
input needs, & next steps.
4. (gin, I (? A 15 - minute session
addressing general questions.
5. C) ia,., I , A 45- 60 minute session
fort -on -1 discussions using long -scale
plots of the project. San Bruno Pavement Rehab - Field Investigation Intelligent
Infrastructure.
Enduring
Communities
sanbell 28
311
SCOPE OF WORK APPROACH
Development of PS& E
Following the City' s approval of the proposed layout, the design team will incorporate feedback from the 30% design review to develop the 60%, 90%, 100%, and final bid construction documents. The 60% submittal will focus on grading, layout, utilities, and other design elements necessary for a comprehensive construction cost estimate. Specifications will be prepared in the City' s format.
Detailed ADA grading, technical specifications, and measurement/ payment clauses will be included in the 100% designs.
Stormwater Treatment Documentation
Sanbell will prepare a stormwater treatment summary memorandum as part of the 30% submittal.
The purpose is to review May 2022' s MRP 3. 0 requirements related to the On -Call Project and document the strategy for LID ( Low Impact Development) improvements. The memorandum will include coordination with the City PM to finalize stormwater treatment measures within the budget.
So. Decoto Green Streets • Union City
Quality and Completeness
The following quality control procedures will ensure project accuracy and reliability:
t'Sw t- fcvir: A Conducted by a PE not part of the design team. t:one:<< ciLHIy/ tiii: al, ili , Pr: vir:.: Focused on minimizing change orders and contractor claims.
inI,'! Ensures coordination among design elements ( e.g., civil, traffic). t‘,° 1Hw ,r.tilt (? r,m. v%(_ c)nt< a( t : Ensures adherence to the original project approach and deliverables.
Peer Reviewer
The peer reviewer for the On - Call Project will be Robert Broestl, PE, a Sanbell Principal with 25+ years of public works engineering experience. Key review items include:
Trench details and utility layouts.
Pedestrian and bicycle safety during construction.
Compliance with City standards and plans.
Utility mapping and conflict resolution.
Sight distance and ADA path of travel.
Intelligent
Infrastructure.
Enduring
Communities.
sanbell 29
312
SCOPE OF WORK APPROACH
Communication Strategy
The Sanbell PM will lead effective communication throughout the design process. City On -Call project elements such as design alternatives, schedule, project costs, budget, and meetings will be effectively communicated by the Consultant to the City. We recommend regular project meetings between the design team and the City. Standing project meetings result in a smooth ebb and flow for the project coordination, with project decision makers remaining in sync. o Project Development Team ( PDT) Meeting Every Two Weeks - City PM & Sanbell PM o Page Turn Review Meeting for each submittal
o Monthly project invoice reporting using Vantagepoint Deltek, including project resource management tools
Technique to Meet Aggressive Schedule
We have found one of the best strategies for meeting aggressive schedules is to maximize the production period for each submittal, and to keep the design momentum. One measure we have implemented on public agency projects is to conduct a " Page -Turn Review Meeting". The process is as follows:
Deliver one set of PDF plans & specifications to each key City reviewer on the morning of the submittal date
The design team and the key City team members will meet in -person or by video conference on the submittal day to review the plans and specs. The Design Team will perform a " page turn" and present the drawings sheet- by sheet. One Bellecci team member will record the comments from City team members. The review meeting may be video remote as appropriate.
Following the " Page Turn Review Meeting," City staff will still have two to three weeks to complete their review. Meanwhile the design team will have in hand most of the major comments and concerns of City Staff. Therefore, the plan production period can commence the next working day.
The implementation of "Page -Turn Meetings" into the design schedule will increase the production time of the overall project schedule, while also maintaining the momentum and continuity of the consultant design team members assigned to the On -Call project.
Tools to Track Project Progress and Costs
Sanbell utilizes the latest accounting software Deltek Vantagepoint which allows our Project Managers to track staff time, and the time spent on a specific project. Sanbell' smonthly goal is to prepare invoices within the first five to seven days of each month, to keep the in- house Team of engineers and project managers informed of the project status, and to provide clients with current budget information and reporting. The Consultant' sProject Manager will notify the City Project Manager whenever there are changes to the project schedule.
Bid Support and Construction Services
Sanbell will provide bid support to the City' s
construction management team during the bidding
period. Services include responding to RFIs, issuing addendum narratives, and clarifying requested information. During construction, Sanbell will offer design support, review submittals, respond to RFIs, conduct site visits, and prepare record drawings as requested. 4-
m
cn'
m
7 5
fi
o
c
n
c
m
m
7 o_
c
7 co
n
o
3 3
c
D
y
sanbell 30
313
Billing Rates n sanbell
Jan 1, 2026 to
Dec 31, 2026
Jan 1, 2027 to
Dec 31, 2027
Jan I, 2028 to
Dec 31, 2028
Engineering Services
Engineering Technician
Staff Engineer'
Staff Engineer II
Staff Engineer Il i
Staff Engineer IV
Project Engineer I / Project Manager I
Project Engineer II / Project Manager II
Senior Engineer I / Senior Project Manager
Senior Engineer II / Senior Protect Manager
Principal Engineer'
Princi pal Engineer II
Construction Services
Public Works Inspector
Senior Public Works Inspector
Public Works Inspector Assistcirr
Construction Manager
Administrative
Resident Engineer
Land Surveying Services
Safety Monitor/ Flag Person
Staff Surveyor
Staff Surveyorii
Professional Land Surveyo+
Professional Land Surveyor 1!
Survey, Party Chief II
Survey, Journeyman Rodman
Survey, Apprentice 1
Survey, Apprentice II
Survey, Apprentice II I
Survey, Apprentice IV
2 -Man Survey Crew
3 -Man Survey Crew
Drone Photography/ Videograph?
Graphic Artist
Legal & Expert Services
Document Review and Case Mectngs
Depositions and Trial Testimony
108 $ 114 $ 118
146 $ 150 $ 158
162 $ 168 $ 174
176 $ 186 $ 192
190 $ 198 $ 206
184 $ 192 $ 200
224 $ 230 $ 236
228 $ 236 $ 242
242 $ 250 $ 256
260 $ 268 $ 276
288 $ 294 $ 300
176 $ 186 $ 192
190 $ 198 $ 206
146 $ 150 $ 158
228 $ 236 $ 242
116 $ 120 $ 124
224 $ 230 $ 236
128 $ 136 $ 136
146 $ 150 $ 158
184 $ 192 $ 200
240 $ 246 $ 250
256 $ 264 $ 270
196 $ 206 $ 216
130 $ 138 $ 146
84 $ 96 $ 104
90 $ 106 $ 112
110 $ 124 $ 132
126 $ 134 $ 144
326 $ 344 $ 362
436 $ 468 $ 494
240 $ 246 $ 250
154 $ 170 $ 170
Client authorized overtime work wil be charged at 135`.•of 270 $ 390 $ 400
446 $ 468 $ 472
Expenses
Bond
Mylar
Large Format Color Presentation
Company Vehicle at Site
Color Copies - 8. 5x11
Color Copies -- 11x17
Other Direct Project Expenses
Subcontractor',
Outside Piintin , & Delivery Service
0. 50/ SF $ 0. 50/ SF $ 0. 50/ SF
18/ SF $ 18/ SF $ 18/ SF
3. 00/ SF $ 3. 00/ SF $ 3. 00/ SF
16/ hr $ 17/ hr $ 18/ hr
1. 50/ EA $ 1. 50/ EA $ 1. 50/ EA
2.5/ EA $ 2.5/ EA $ 2.5/ EA
Cost + 10% Cost + 10',:. Cost +-10%
Cost 4 10% Cost + 10% Cost + 10%
Cost + 10% Cost + 10, Cost + 1Wt,
314
ATTACHMENT ' C'
CITY OF LATHROP
TASK ORDER NO. 1 PURSUANT TO MASTER CONSULTING AGREEMENT WITH SANBELL, DATED JULY 13, 2026
TO PROVIDE ON -CALL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES FOR METER VAULT AND FLOW METER REPLACEMENT SERVICES, CIP WW 26- 32 THIS TASK ORDER NO. 1, dated for convenience this 13th day of July 2026, is by and made and entered into by and between Sanbell (" CONSULTANT"), and the City of Lathrop, a California municipal corporation of the State of California (" CITY"); RECITALS:
WHEREAS, on July 13, 2026, CONSULTANT entered into a Master Agreement AGREEMENT") with the CITY, by which the CONSULTANT has agreed to provide professional architectural and engineering services on an on -call, as -needed basis; and WHEREAS, CONSULTANT is specially trained, experienced, and competent to perform on -call architectural and engineering consulting services, which are required by this agreement; and
WHEREAS, CONSULTANT is willing to render such on -call architectural and engineering services, as hereinafter defined, on the following terms and conditions.
NOW, THEREFORE, CONSULTANT and the CITY agree as follows:
AGREEMENT
1) Incorporation of Master Agreement
This Task Order No. 1 hereby incorporates by reference all terms and conditions set forth in the Master Agreement for On -Call Architectural and Engineering Consulting Services dated June 8, 2026, unless specifically modified by this Task Order. 2) Scope of Service
CONSULTANT agrees to perform services in accordance with the scope of work and fee proposal provided by CONSULTANT, attached hereto as Exhibit " A" and incorporated herein by reference. CONSULTANT agrees to diligently perform these services in accordance with the upmost standards of its profession and to CITY' ssatisfaction. 3) Effective Date and Term
The effective date of Task Order No. 1 is July 13, 2026, and it shall terminate no later than June 30, 2027.
4) Compensation
CITY hereby agrees to pay CONSULTANT hourly rates and other charges not to exceed 41,60 for the base scope fee design and construction support services and $ 19, 471 for the Optional Services for a total of $60, 931 for the On -Call Architectural and Engineering Consulting Services described in Exhibit "A" of Task Order No. 1 pursuant to the Proposal for Meter Vault Sealing and Flow Meter Replacement Services dated May 20, 2026 and
315
CITY OF LATHROP - SANBELL
TASK ORDER NO. 1 TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR
METER VAULT SEALING AND FLOW METER REPLACEMENT SERVICES the Master Agreement dated July 13, 2026. CONSULTANT shall be paid any uncontested sum due and payable within thirty ( 30) days of receipt of billings containing all information pursuant to Paragraph 5 below. Compensation for any task must beequal to or less than the percentage of task complete. In no event shall CONSULTANT be entitled to compensation beyond what is expressed in this agreement and Exhibit "A", unless CITY has authorized representative has executed a written change order or authorization describing the extra work and payment terms prior to the commencement of the work. 5) Notice to Proceed
Prior to commencing work under this agreement, CONSULTANT shall receive a written Notice to Proceed" from CITY. A Notice to Proceed shall not be issued until all necessary documents and insurance have been received. CITY shall not be obligated to pay CONSULTANT for any services prior to issuance of the Notice to Proceed. 6) Signatures
The individuals executing this Agreement represent and warrant that they have theright, power, legal capacity, and authority to enter into and to execute thisAgreement on behalf of the respective legal entities of the CONSULTANT and theCITY. This agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns.
CITY OF LATHROP - SANBELL
TASK ORDER NO. 1 TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR
METER VAULT SEALING AND FLOW METER REPLACEMENT SERVICES Approved as to Form:
Recommended for Approval:
Approved by:
Consultant:
City of Lathrop
City Attorney
Salvador Navarrete
City of Lathrop
Public Works Director/ City Engineer
Date
Brad Taylor Date
City of Lathrop
390 Towne Centre Drive
Lathrop, CA 95330
Stephen J. Salvatore Date
City Manager
Sanbell
7077 Koll Center Pkwy., Ste 210
Pleasanton, CA 94566
Fed ID #
Lathrop Business License #
Signature Date
Print Name and Title
Signature Date
Print Name and Title
Page
3173 of 3
n sanbell
May 20, 2026
Mr. Gregory Gibson
City of Lathrop - Public Works Department
390 Towne Center Drive
Lathrop, CA 95330
Subject: Proposal for Meter Vault Sealing and Flow Meter Replacement Services Dear Mr. Gibson,
Sanbell is pleased to submit our proposal to provide engineering services for the rehabilitation of the CLSP and River Islands 2A sewer pump station flow meter vaults for the City of Lathrop. Our team understands the City is seeking assistance to investigate existing conditions, prepare recommendations, and develop plan and specifications for sealing the vaults and restoring the damaged flow meter equipment.
Sanbell, along with Domenichelli and Associates, Inc. (D&A) and A. T. E. M. Electrical Engineering, brings extensive experience in utility infrastructure and multidisciplinary coordination for public agency projects.
Please see attached our proposed scope of work and budget for your consideration. We appreciate the opportunity to support the City on this project and look forward to working with you. Should you have any questions or require additional information, please feel free to contact us.
Sincerely
Daniel Leary, • E * OEQSD
Managing Pri cipal
Intelligent Infrastructure, Enduring Communities.
318
CIVIL ENGINEERING
DOMENICHELLI AND ASSOCIATES, INC.
CIVIL ENGINEERING
SCOPE OF WORK
City of Lathrop - Meter Vault Repair
Sealing and Meter Replacement
Sanbell
Attn: Daniel Leary, P. E.
Daniel,
May 19, 2026
Domenichelli and Associates, Inc. (D&A) is pleased to submit the attached Proposal in response to your request for assistance on the lift station meter vault repair project for the City of Lathrop. Our point of contact will be Daryl Heigher, at Dary1H a daengineering. net.
Our team will be led by Daryl Heigher, who has 30 years of experience managing and designing structural and mechanical engineering projects. Our team will also include Juan Mercado as an assistant engineer and drafter.
Our preferred electrical engineering sub -consultant is A T. E. M., a firm with whom we have developed strong working relationships over many years. A T. E. M. Electrical Engineering will provide an evaluation of the electrical system to provide a solution for reconnecting existing equipment.
Thank you for the opportunity to provide a proposal for the engineering services for the City' s project. If you have any questions or require additional information, please do not hesitate to contact me.
Sincerely,
Joe Domenichelli, P. E. — President,
Domenichelli and Associates, Inc.
Office: (916) 933- 1997 Cell: (916) 716- 4207
5180 Golden Foothill I'arkh Suite 220, l] Dorado IIiIIs, (':\ 95762 Mac 19, 2026
916) 933- 1997
319
CIVIL ENGINEERING
Project Understanding
D&Aunderstands that the City of Lathrop is interested in rehabilitating flow meter vaults at two of their sewage pump stations. The vaults have been flooded and the electrical equipment contained therein has been compromised.
The City would like us to prepare drawings and specifications to seal the vaults. Electrical equipment replacement will be handled via a narrative description to be included on the civil drawings.
D&A would like to plan a site visit to see the two sites and to be able to ask the City questions regarding the vaults and verify why the vaults flooded and how to repair/ seal them.
Electrical Scope:
1. A short descriptive paragraph directing the contractors work on replacing the flowmeters at each site.
The text will be included on the civil drawings.
2. Costs do not include site visit. A TEEM may require a site visit as the project progresses and will negotiate those costs at that time.
3. Design including site plans, and specifications are not included in this quote.
DOMENICHELLI AND ASSOCIATES, INC.
CIVIL ENGINEERING
SCOPE OF WORK
Fee Estimate
The costs presented below are for the initial investigation and an initial estimated budget for the civil plans and specifications. Based upon what is found in the initial investigation, the budget for the project may need to be revised.
Tasks
Task 1: Project Management
1. 1. 2
Project Management & Coordination
Meetings ( 2 Virtual)
Subtotal Task 1
Labor Total
Task 2: Review Available Information and Perform Site Investigation
2. 1
2. Background Information Review
Field Investigation & Site Visit
Task 3: Design
3. 1
3. 2
Civil Design
Electrical Evaluation
Subtotal Task 2:
Subtotal Task 3:
2, 938
2,03
5, 141
15, 620
16, 480
Electrical
Engineering
0 2, 000
2, 000
3, 000
3, 000
734
2, 046
5, 138
2,03
7, 341
15, 620
4, 160
19, 780
96 138 $ 23, 667 $ 5, 000 $ 29, 167
10% has been added to the subconsultant costs
2 5180 Golden Foothill Parka Suitt 220, El Dorado 11ills, (' A 95762 May 19, 2026
916)33- 1997
320
Client:
City
of Lathrop Proposal
for:
Sealing &
Meter Replacement
Infrastructure .
Intellig
ent
E
nduring
TASKS
Task
Description
Principal
II Engineer
Principal
I Engineer
Senior
II Engineer
Senior
I Engineer
Pr
oj
Eng
II Mngr ProjII/
Project
I Engineer
Engineer Staff
288
260
242
228
224
184
I
Project
Management
2 4
2 3
Project
Management +
Site
Investiagtion +
Design
Bid
Support
Services (
T&M) -
ALW
I
I
4Construction
Assistance (
T&M) -
ALW
I
OPTIONAL
SERVICES
5Allowance
for
additional
design,
identified
during
I
2 6
CA
Add
Allowance,
if
needed
1. 0
2 Notes: Distribution
of
Hours
may
vary
during
the perfo
rmance
of
the
services
Billing
rates
will
have
4%
escalation
at
each
calendar
year
321
05/ 20026 -
v1
Engineering
Pro
Admin Tech /
Sury Land f
Pro
I I
Sury Land f
I
Surveyor Staff
III
person 3 -
crew survey
2 - person
crew survey
Hours Total
Total Labor Costs
nichelli Dome
ATEEM
Mark o -D c
Direct •Other
C
osts
C7
Total Total Fee
108
256
240
184
436
326
8 14
2, 120
0 400
2, 520
0 0
23, 667
5,00
2, 917
32, 084
2 4
660
800
400
120
980 1,
2 3
476
3, 000
1, 000
400
4, 876
41,60
4 7
1, 088
7, 500 $
2, 500
1, 000
300
12,
4 7
088 1,
4, 200 $
1, 250
545
7, 083
322
ITEM 4. 14
CITY MANAGER' SREPORT
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
ITEM: FIND THAT A PORTION OF PARCEL B OF TRACT 4219,
VILLAGE 21 IS NO LONGER NEEDED FOR ITS
DEDICATED PURPOSE AND ACCEPT AN
IRREVOCABLE OFFER OF DEDICATION OF ROAD
RIGHT- OF- WAYFOR THE CAUFIELD WAY EXTENSION
FROM CALIFIA, LLC
RECOMMENDATION: Adopt Resolution to Find that a Portion of Parcel B of Tract 4219, Village 21 is No Longer Needed for its
Dedicated Purpose and Accept an Irrevocable Offer
of Dedication of Road Right -Of -Way for the Caufield
Way Extension from Califia, LLC
SUMMARY:
The Final Map for Tract 4219, River Islands Phase 2, Village 21 ( Tract 4219) was approved by City Council on June 3, 2024 and recorded on July 2, 2024 in Book 44 of Maps and Plats at Page 104, San Joaquin County Records. As part of that map, Parcels A through I, including Parcel B, were dedicated in fee to the City of Lathrop for purposes of open space, landscaping, public utilities, fence maintenance, and appurtenances thereto, for the benefit of the public. The Tract 4219 Final Map expressly provides that the City shall reconvey any such parcel to the subdivider if the City determines, pursuant to Government Code Section 66477. 5, that the same purpose for which the property was dedicated does not exist. The public improvements associated with Tract 4219 have not yet been accepted by the City.
A portion of Parcel B must now be dedicated as road right- of- way to allow for the extension of Caufield Way, which will provide the Village 21 neighborhood with direct vehicular access to River Islands Parkway. Staff requests that City Council find that the subject portion of Parcel B is no longer needed for its originally dedicated purpose of open space, landscaping, public utilities, fence maintenance, and appurtenances thereto, and instead is needed for road right- of- way purposes consistent with the planned circulation system for the River Islands Phase 2 project. Upon that finding, Califia, LLC, as the original subdivider of Tract 4219, will offer the subject strip as an Irrevocable Offer of Dedication of road right- of- way to the City of Lathrop. The Irrevocable Offer of Dedication is included as Attachment " B." Staff recommend that City Council adopt the Resolution included as Attachment " A" making the finding contemplated in the Tract 4219 Final Map' s reconveyance clause and accept the Irrevocable Offer of Dedication of road right- of- way for the Caufield Way extension from Califia, LLC.
323
CITY MANAGER' S REPORT PAGE 2
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
FIND THAT A PORTION OF PARCEL B OF TRACT 4219, VILLAGE 21 IS NO
LONGER NEEDED FOR ITS DEDICATED PURPOSE AND ACCEPT AN
IRREVOCABLE OFFER OF DEDICATION OF ROAD RIGHT- OF- WAY FOR THE
CAUFIELD WAY EXTENSION FROM CALIFIA, LLC
BACKGROUND:
On June 14, 2021, the City of Lathrop City Council adopted resolutions and ordinances approving the River Islands modified Phase 2 Project and Vesting Tentative Subdivision Map ( VTM) 6716. On November 14, 2022, City Council approved Tract 4149 West Village Large Lot Final Map ( LLFM) to create 34 undevelopable parcels. On March 25, 2024, City Council approved Tract 4205 Woodlands East LLFM to create 23 undevelopable parcels. The Final Map for Tract 4219, Village 21 was subsequently approved by City Council on June 3, 2024, subdividing Parcel 9 of Tract 4205 into 133 residential lots and Parcels A through I, which were dedicated in fee to the City of Lathrop for purposes of open space, landscaping, public utilities, fence maintenance, and appurtenances thereto, for the benefit of the public.
The Tract 4219 Final Map dedicated Caufield Way as a public right- of- way easement to the City of Lathrop. However, the dedication of Caufield Way as shown on the Final Map does not extend through Parcel B to connect with River Islands Parkway.
As a result, the Village 21 neighborhood currently lacks a direct roadway connection to River Islands Parkway via Caufield Way. To complete this connection, a portion of Parcel B must be dedicated as road right- of- way, extending Caufield Way from its current terminus through Parcel B to River Islands Parkway.
Government Code Section 66477. 5provides that if a local agency has determined that the same public purpose for which a dedication was required does not exist, it shall reconvey the property to the subdivider. The Tract 4219 Final Map includes an express reconveyance clause referencing Government Code Section 66477. 5, stating that the City shall reconvey any dedicated parcel to the subdivider upon such a finding. Because the subject strip of Parcel B is needed for road right- of- way rather than the open space, landscaping, public utilities, fence maintenance, and appurtenances purposes for which it was originally dedicated in fee, the City Council is requested to make the finding contemplated in that reconveyance clause.
Concurrently, Califia, LLC, as the original subdivider, will execute and deliver the Irrevocable Offer of Dedication of the subject strip as road right- of- way to the City of Lathrop pursuant to Government Code Section 7050, with the reconveyance and rededication occurring as part of this Council action.
REASON FOR RECOMMENDATION:
Making the finding under Government Code Section 66477. 5 and accepting the Irrevocable Offer of Dedication of road right- of- way for the Caufield Way extension is necessary to establish the City' slegal right- of- way interest over the subject portion of Parcel B, enabling the design, permitting, and construction of the Caufield Way extension. Completing this connection will provide the Village 21 neighborhood with direct access to River Islands Parkway, improving circulation for residents. 324
CITY MANAGER' S REPORT PAGE 3
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
FIND THAT A PORTION OF PARCEL B OF TRACT 4219, VILLAGE 21 IS NO
LONGER NEEDED FOR ITS DEDICATED PURPOSE AND ACCEPT AN
IRREVOCABLE OFFER OF DEDICATION OF ROAD RIGHT- OF- WAY FOR THE
CAUFIELD WAY EXTENSION FROM CALIFIA, LLC
FISCAL IMPACT:
There is no fiscal impact to the City associated with the finding or acceptance of this Irrevocable Offer of Dedication. All costs related to the design and construction of the Caufield Way extension improvements have been and will be paid for by Califia, LLC ATTACHMENTS:
A. Resolution to Find that a Portion of Parcel B Of Tract 4219, Village 21 is No Longer Needed For Its Dedicated Purpose and Accept an Irrevocable Offer of Dedication of Road Right -Of -Way for the Caufield Way Extension from Califia, LLC
B. Irrevocable Offer of Dedication of Road Right -of -Way — Caufield Way Extension — Parcel B, Tract 4219, Village 21
325
CITY MANAGER' S REPORT PAGE 4
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
FIND THAT A PORTION OF PARCEL B OF TRACT 4219, VILLAGE 21 IS NO
LONGER NEEDED FOR ITS DEDICATED PURPOSE AND ACCEPT AN
IRREVOCABLE OFFER OF DEDICATION OF ROAD RIGHT- OF- WAY FOR THE
CAUFIELD WAY EXTENSION FROM CALIFIA, LLC
APPROVALS:
Bellal Nabizadah
Assistant Engineer
3(/\ /(
Date
Brad aylor Date
Publi Works Director / City Engineer
7f hozy
Thomas Hedegard Date
Deputy City Manager
7- l•ZoZC'
Michael King Date
Assistant City Manager
7. (,-- za9Z6
Salvador Navarrete Date
City Attorney
1•$• Z!o
Stephen J. Salvatore Date
City Manager
326
RESOLUTION NO. 26-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LATHROP TO FIND THAT A PORTION OF PARCEL B OF TRACT 4219, VILLAGE 21 IS NO LONGER
NEEDED FOR ITS DEDICATED PURPOSE AND ACCEPT AN IRREVOCABLE
OFFER OF DEDICATION OF ROAD RIGHT- OF- WAY FOR THE CAUFIELD WAY
EXTENSION FROM CALIFIA, LLC
WHEREAS, on June 14, 2021, the City of Lathrop City Council adopted resolutions and ordinances approving the River Islands modified Phase 2 Project and Vesting Tentative Subdivision Map ( VTM) 6716; and
WHEREAS, on November 14, 2022, the City of Lathrop City Council approved West Village Large Lot Final Map ( LLFM) 4149; and
WHEREAS, on March 25, 2024, the City of Lathrop City Council approved Woodlands East LLFM 4205; and
WHEREAS, the Final Map for Tract 4219, River Islands Phase 2, Village 21 Tract 4219) was approved by the City Council on June 3, 2024 and recorded on July 2, 2024 in Book 44 of Maps and Plats at Page 104, Official Records of San Joaquin County; and
WHEREAS, as part of the Tract 4219 Final Map, Parcels A through I, including Parcel B, were dedicated in fee to the City of Lathrop for purposes of open space, landscaping, public utilities, fence maintenance, and appurtenances thereto, for the benefit of the public; and
WHEREAS, the Certificate of Dedication on the Tract 4219 Final Map includes a reconveyance clause referencing Government Code Section 66477. 5, stating that the City of Lathrop shall reconvey the property to the subdivider if the City makes a determination that the same purpose for which the property was dedicated does not exist; and
WHEREAS, the Tract 4219 Final Map dedicated Caufield Way as a public right- of- way easement to the City of Lathrop, but that dedication does not extend through Parcel B to connect with River Islands Parkway, and the Village 21 neighborhood currently lacks a direct roadway connection to River Islands Parkway via Caufield Way; and
WHEREAS, a portion of Parcel B must be dedicated as public road right- of- way in order to extend Caufield Way from its current terminus through Parcel B to River Islands Parkway and thereby improve vehicular access and circulation for the Village 21 neighborhood; and
WHEREAS, staff has requested that the City Council find that the subject portion of Parcel B is no longer needed for its originally dedicated purpose of open space, landscaping, public utilities, fence maintenance, and appurtenances thereto, 327
and instead is needed for public road right- of- way purposes consistent with the circulation system planned for River Islands Phase 2; and WHEREAS, concurrent with such determination, Califia, LLC, a California limited liability company and the original subdivider of Tract 4219, has prepared an Irrevocable Offer of Dedication of the subject strip as public road right- of- way for the Caufield Way extension to the City of Lathrop, pursuant to Government Code Section 7050; and
WHEREAS, the Irrevocable Offer of Dedication of Road Right -of -Way for the Caufield Way Extension, describing the subject portion of Parcel B is attached to the City Manager' sReport as Attachment " B"; and
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Lathrop as follows:
1. City Council hereby finds that the specific strip of land within Parcel B of Tract 4219, Village 21, as more particularly described in Exhibit " A" to the Irrevocable Offer of Dedication attached to the City Manager' s Report that accompanied this Resolution, is no longer needed for the purposes of open space, landscaping, public utilities, fence maintenance, and appurtenances thereto, for the benefit of the public, as described in the Tract 4219 Final Map, and that the strip is instead needed for public road right- of- way purposes to accommodate the Caufield Way extension.
2. City Council hereby accepts the Irrevocable Offer of Dedication of public road right- of- way for the Caufield Way extension over the subject strip of land within Parcel B of Tract 4219, Village 21, from Califia, LLC, a California limited liability company, in substantially the form attached as Attachment " B" to the July 13, 2026 City Manager' s Report, pursuant to Government Code Section 7050.
3. The City Manager, or their designee, is authorized to execute the Irrevocable Offer of Dedication and any related documents in substantially the form attached, and to take all actions necessary to implement this Resolution, including processing any related title documentation consistent with the reconveyance clause on the Tract 4219 Final Map
328
PASSED AND ADOPTED by the City Council of the City of Lathrop this 13th day of July 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Paul Akinjo, Mayor
ATTEST: APPROVED AS TO FORM:
Teresa Vargas, City Clerk Salvador Navarrete, City Attorney 329
Attachment
GI r
RECORDING REQUESTED BY, AND
WHEN RECORDED MAIL TO:
CITY OF LATHROP
ATTN: CITY CLERK
390 TOWNE CENTRE DRIVE
LATHROP, CA 95330
Exempt from payment ofrecording fees ( GC 27383)
SPACE ABOVE THIS LINE FOR RECORDER' S USE
IRREVOCABLE OFFER OF DEDICATION OF EASEMENT
FOR PUBLIC ROADWAY AND PUBLIC UTILITY EASEMENT PURPOSES TRACT 4219 - OFFSITE ROADWAY DEDICATION - CAUFIELD WAY) FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, Califia, LLC, a California limited liability company, hereby grant( s) to the CITY OF LATHROP, a municipal corporation in the County of San Joaquin, State of California, an easement for ingress, egress and road purposes, and a public utility easement ( PUE), over and across the hereinafter described real property situated in City of Lathrop and more particularly described as follows:
SEE EXHIBITS " A" AND " B" ATTACHED HERETO AND MADE A PART HEREOF This Offer of Dedication is made pursuant to Section 7050 of the Government Code of the State of California and may be accepted at any time by the City Engineer of the City of Lathrop. This Offer of Dedication may be terminated, and right to accept such offer abandoned in the same manner as is prescribed for the vacation of streets or highways by Part 3 of Division 9, or Chapter 2 of Division 2 of the Streets and Highways Code of the State of California, whichever is applicable.
The above described easement is to be kept open, clear and free from buildings and structures of any kind.
This Offer of Dedication shall be irrevocable and shall be binding on the Grantor' sheirs, executors, administrators, successors and assigns.
SIGNATURES:
Signed this day of July, 2026
CALIFIA, LLC
a California limited liability company
By:
Name: Susan De11' Osso, President
Notary Acknowledgment Required for Each Signatory)
330
JN 25504 5/ 12/ 2026
EXHIBIT " A"
LEGAL DESCRIPTION
IRREVOCABLE OFFER OF DEDICATION FOR RIGHT- OF- WAYPURPOSES
CAUFIELD WAY
RIVER ISLANDS -PHASE 2
CITY OF LATHROP, SAN JOAQUIN COUNTY, CALIFORNIA
CERTAIN REAL PROPERTY SITUATED IN THE CITY OF LATHROP, COUNTY OF SAN JOAQUIN, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS:
BEING A PORTION OF PARCEL B, AS SAID PARCEL IS SHOWN ON THE MAP ENTITLED " TRACT 4219, RIVER ISLANDS - PHASE 2, VILLAGE 21 FINAL MAP", FILED JULY 2, 2024, IN BOOK 44 OF MAPS AND PLATS, AT PAGE 104, OFFICIAL RECORDS OF SAN JOAQUIN COUNTY, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE CENTERLINE MONUMENT AT THE INTERSECTION OF CAUFIELD WAY AND BARNETT STREET, AS SAID MONUMENT IS SHOWN ON SAID MAP OF TRACT 4219; THENCE, SOUTH 17° 28' 50" EAST FOR A DISTANCE OF 30. 00 FEET TO THE NORTHERLY LINE OF SAID PARCEL B, ALSO BEING THE POINT OF BEGINNING;
THENCE, ALONG SAID NORTHERLY LINE OF SAID PARCEL B, NORTHEASTERLY ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 1026. 00 FEET, FROM WHICH THE CENTER OF SAID CURVE BEARS SOUTH 17° 23' 12" EAST, THROUGH AN ANGLE OF 03° 44' 32", AND AN ARC DISTANCE OF 67. 01 FEET;
THENCE LEAVING SAID NORTHERLY LINE, SOUTH 29° 01' 07" WEST FOR A DISTANCE OF 41. 30 FEET;
THENCE SOUTH 17° 28' 50" EAST FORA DISTANCE OF 52. 26 FEET; THENCE SOUTH 60° 50' 55" EAST FOR A DISTANCE OF 43. 62 FEET TO THE SOUTHERLY LINE OF SAID PARCEL B;
THENCE, ALONG SAID SOUTHERLY LINE, SOUTHWESTERLY ALONG A CURVE HAVING A RADIUS OF 913. 00 FEET, FROM WHICH POINT THE CENTER OF SAID CURVE BEARS SOUTH 13° 16' 31" EAST, THROUGH AN ANGLE OF 08° 24' 38", AND AN ARC DISTANCE OF 134. 02 FEET; THENCE LEAVING SAID SOUTHERLY LINE, NORTH 25° 53' 15" EAST FOR A DISTANCE OF 43. 62 FEET;
THENCE NORTH 17° 28' 50" WEST FOR A DISTANCE OF 52. 38 FEET; THENCE NORTH 63° 53' 09" WEST FOR A DISTANCE OF 41. 37 FEET TO THE NORTHERLY LINE OF SAID PARCEL B;
THENCE, ALONG SAID NORTHERLY LINE OF SAID PARCEL B, NORTHEASTERLY ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 1026. 00 FEET, FROM WHICH THE CENTER OF SAID CURVE BEARS SOUTH 21° 07' 43" EAST, THROUGH AN ANGLE OF 03° 44' 31", AND AN ARC DISTANCE OF 67. 01 FEET TO THE POINT OF BEGINNING;
CONTAINING 10,04 SQUARE FEET, MORE OR LESS.
CONTINUED ON NEXT PAGE]
N:\_ ODE\ Pleasanton\ 25504- River Islands \ DWG \ FINAL MAPS TRACT 4219 - VILLAGE 21\ Exhibits\ PDF\ CAUIELD WAY I.O. D\ 255O4- CAUFIELD WAY IOD- LEGAL. docx
331
JN 25504 5/ 12/ 2026
A PLAT OF THE ABOVE DESCRIBED PARCEL IS ATTACHED HERETO AS EXHIBIT " B" AND BY THIS REFERENCE MADE A PART HEREOF.
END DESCRIPTION
THIS DESCRIPTION HAS BEEN PREPARED BY ME, OR UNDER MY DIRECTION, IN CONFORMANCE WITH THE REQUIREMENTS OF THE PROFESSIONAL LAND SURVEYOR' SACT.
WILLIAM M. KOCH
PROFESSIONAL LAND SURVEYOR
CALIFORNIA NO. 8092
DATE
N:\_ ODE\ Pleasanton\ 255O4- RiverIslands \ DWG \ FINAL MAPS\ TRACT 4219 - VILLAGE 21\ Exhibits\ PDF\ CAUIELD WAY I.O. D\ 25504- CAUFIELD WAY IOD- LEGAL. docx
332
PARCEL a
TRACT 4205
44 1\/rrP- 90)
P. O. C .\
R) 7
O
30. 00'( M -B)-
25 c
N - 3
0 og ( 66- 13" ' R)
c5 P. O. B. e, 1\ D' 1056• 4
D
J
NOTES
1 NP .
GP
lJ
PARCEL l
TRACT 4215
4 4 - IWrP- 102)
R) 8
0 6„ `,
151 )
1A (
R) 2
o (
rn R) 9
l
0s
C5
A58 59
D' 28
6 ( R) 5
A6
Oc. 10) 61g5MM -
C6
1. SEE SHEET 2 FOR LEGEND.
2. SEE SHEET 2 FOR LINE & CURVE TABLES.
R) 11
N
o,
R) 3
C2
0 25 50
SCALE: 1" = 50'
C7
TRACT 4220
ilit- lV1& P-- l03)
R) 10
p, 8
20, 05„
65' W -0 -
Westwood Westwood Professional Services, Inc.
1165 SCENIC DRIVE, SUITE A
MODESTO, CA 953350
westwoodps. com
Ti 209. 5711765
EXHIBIT " B" PLAT TO ACCOMPANY LEGAL DESCRIPTION
IRREVOCABLE OFFER OF DEDICATION FOR RIGHT- OF- WAY
AND PUBLIC UTILITY PURPOSES
CAUFIELD WAY
RIVER ISLANDS PHASE 2
CITY OF LATHROP SAN JOAQUIN COUNTY CALIFORNIA
SCALE: 1"= 50'
DRAWN BY: BK
FILE: 255O4_ TRACT 4219_ VILLAGE 21_ CAUFIELD IOD DWG
DATE: 5/ 12/ 2026 SHEET: 1 OF 2
333
LINE TABLE
LINE # DIRECTION LENGTH
L1 S29° 01'7" W 41. 30'
L2 S60° 50'5" E 43. 62'
L3 N25° 53' 15" E 43. 62'
L4 N63° 53' 09" W 41. 37'
LEGEND
CURVE TABLE
CURVE # RADIUS DELTA LENGTH
C1 1026. 00' 3°44'2" 67. 01'
C2 913. 00' 4°12'9" 67. 01'
C3 913. 00' 4°12'9" 67. 01'
C4 1026. 00' 3°44'1" 67. 01'
C5 1026. 00' 1°02' 34" 18. 67'
C6 1026. 00' 0°38' 48" 11. 58'
C7 913. 00' 0°10' 33" 2. 80'
I.O. D. EASEMENT LINE
EX. LOT LINE
I.O. D. IRREVOCABLE OFFER OF DEDICATION FOR ROADWAY PURPOSES
POB POINT OF BEGINNING
POC POINT OF COMMENCEMENT
R) - RADIAL BEARING
XX M&P YY - IN BOOK XX MAPS AND PLATS AT PAGE YY, S. J.C. R.
T) TOTAL
M - M) MONUMENT TO MONUMENT
M - B) - MONUMENT TO BOUNDARY
B) - BOUNDARY
B - CL INTX) - BOUNDARY TO CENTERLINE INTERSECTION
O - FOUND MONUMENT IN STANDARD CITY OF LATHROP MONUMENT WELL, STAMPED " PLS 7788"
RADIAL BEARINGS
LINE # DIRECTION
R) 1 S17° 23' 12" E
R) 2 S13° 38' 40" E
R) 3 S13° 16' 31 "E
R) 4 S17° 28' 50" E
R) 5 S21 ° 41' 10" E
R) 6 S21 ° 07' 43" E
R) 7 S64° 16' 06" W
R) 8 S17° 23'1 "E
R) 9 S12° 59'2" E
R) 10 S13° 05' 58" E
R) 11 S17° 28' 50" E
Westwood Westwood Professional Services, Inc.
1165 SCENIC DRIVE, SUITE A westwoodpa. com
MODESTO, CA 953350 T. 209. 571. 1765
EXHIBIT " B" PLAT TO ACCOMPANY LEGAL DESCRIPTION
IRREVOCABLE OFFER OF DEDICATION FOR RIGHT- OF- WAY
AND PUBLIC UTILITY PURPOSES
CAUFIELD WAY
RIVER ISLANDS PHASE 2
CITY OF LATHROP SAN JOAQUIN COUNTY CALIFORNIA
SCALE: N/ A
DRAWN BY: BK
FILE: 25504_ TRACT a219_ ALLACE 21_ CAUTIELD 10D. DWG
DATE: 5/ 12/ 2026 SHEET: 2 OF 2
334
ITEM 5. 1
CITY MANAGER' S REPORT
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
ITEM: PUBLIC HEARING ( PUBLISHED NOTICE) TO
CONSIDER AN ORDINANCE OF THE CITY OF
LATHROP TO AMEND SECTION 10. 24. 030 TO TITLE
10 (" VEHICLES AND TRAFFIC") OF THE LATHROP
MUNICIPAL CODE TO DESIGNATE NO PARKING
AREAS ON YOSEMITE COURT AS NO PARKING OF
VEHICLES OVER 5 TONS
RECOMMENDATION: City Council to Consider the Following:
1. Hold a Public Hearing; and
2. Introduction and First Reading of an Ordinance
to Amend Section 10. 24. 030 to Title 10
Vehicles and Traffic") of the Lathrop
Municipal Code to Designate No Parking Areas
on Yosemite Court as no Parking of Vehicles
Over 5 Tons
SUMMARY:
Staff has identified a necessary amendment to the Lathrop Municipal Code Section LMC) 10. 24. 030 titled " Designated No Parking Areas" to amend Yosemite Court from the list of prohibited zones to better align with the operation of the local businesses.
Staff request that City Council hold a public hearing, consider all information and public testimony and, if determined to be appropriate, adopt the proposed Ordinance Attachment A) to amend Section 10. 24. 030 of the Lathrop Municipal Code.
BACKGROUND:
Pursuant to California Vehicle Code ( CVC) Section 22507, the City is required to establish no parking areas within City limits by Ordinance. Section 10. 24. 030 of the LMC allows the Lathrop Police Department to enforce the no parking areas.
Staff has identified necessary amendment to LMC Section 10. 24. 030 to remove the total parking prohibition on Yosemite Court because this street serves a mix of industrial and commercial uses. Staff recommends replacing the current total ban with a specific weight -based restriction prohibiting the parking of vehicles over 10, 000 pounds ( or 5 tons) to support safer streets and addresses littering and loitering concerns by restricting heavy commercial vehicle storage while accommodating the parking needs of the adjacent business uses. Staff is requesting that City Council consider the approval of the proposed Ordinance to amend LMC Section 10. 24. 030 to modify street sections as described in Exhibit A to Attachment A.
335
CITY MANAGER' S REPORT PAGE 2
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
PUBLIC HEARING ( PUBLISHED NOTICE) TO CONSIDER AN ORDINANCE OF THE CITY OF LATHROP TO AMEND SECTION 10. 24. 030 OF THE LATHROP
MUNICIPAL CODE TO DESIGNATE NO PARKING AREAS ON YOSEMITE COURT AS NO PARKING OF VEHICLES OVER 5 TONS
REASON FOR RECOMMENDATION:
Approval of the Ordinance will modify the no parking areas. This action is consistent with the intended and planned use of the roadways, shoulders, and street frontages.
Staff recommends that Council approve the modifications to the existing parking restrictions in the Lathrop Municipal Code as described in Exhibit A to Attachment A.
FISCAL IMPACT:
There is sufficient funding in Street Fund 2080 to cover the various costs associated with the additions and modifications to the no parking areas, including installation of signs.
ATTACHMENTS:
A. An Ordinance to Amend Section 10. 24. 030 to Title 10 (" Vehicles and Traffic") of the Lathrop Municipal Code to Designate No Parking Areas on Yosemite Court as no Parking of Vehicles Over 5 Tons
Exhibit A: Section 10. 24. 030 Designated No Parking Areas. 336
Veronica Albarran
Assistant Engineer
CITY MANAGER' S REPORT PAGE 3
JULY 13, 2026 CITY COUNCIL REGULAR MEETING
PUBLIC HEARING ( PUBLISHED NOTICE) TO CONSIDER AN ORDINANCE OF THE CITY OF LATHROP TO AMEND SECTION 10. 24. 030 OF THE LATHROP
MUNICIPAL CODE TO DESIGNATE NO PARKING AREAS ON YOSEMITE COURT AS NO PARKING OF VEHICLES OVER 5 TONS
APPROVALS:
O( olaG ( a ao
Date
6/ 56/ 74k
Bra Taylor Date
Public Works Director/ City Engineer
Cari Jam
Finance * rector
7/4a4
Date
if? / tot('
Thomas Hedegard Date
Deputy City Manager
7•/• zozco
Michael King Date
Assistant City Manager
Salvador Navarrete Date
City Attorney
1. 2 2tv
Stephen J. Salvatore Date
City Manager
337
ORDINANCE NO. 26 -
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LATHROP TO AMEND SECTION 10. 24. 030 TO TITLE 10 (" VEHICLES AND TRAFFIC") OF THE
LATHROP MUNICIPAL CODE TO DESIGNATE NO PARKING AREAS ON YOSEMITE COURT AS NO PARKING OF VEHICLES OVER 5 TONS
WHEREAS, pursuant to California Vehicle Code ( CVC) Section 22507, the City is required to establish No Parking Areas within the City limits by ordinance; and WHEREAS, staff has identified necessary modifications to the Lathrop Municipal Code Section ( LMC) 10. 24. 030 titled " Designated No Parking Areas" to modify Yosemite Court from the list of prohibited zones to better align with the street' scommercial and industrial uses; and
WHEREAS, staff request that City Council consider amending LMC Section
10. 24. 030, as shown in Exhibit A incorporated by reference herein.
NOW, THEREFORE, BE IT ORDAINED that the City Council of the City of Lathrop does hereby approve amending Section 10. 24. 030 entitled " Designated No Parking Areas" of the Lathrop Municipal Code as shown in Exhibit A, incorporated by reference herein.
Section 1. The Lathrop Municipal Code is hereby amended as shown in Exhibit A, attached hereto and incorporated by reference herein.
Section 2. Duty of Care This Ordinance is not intended to and shall not be construed or given effect in a manner that imposes upon the city or any officer or employee thereof a mandatory duty of care toward persons and property within or without the city so as to provide a basis of civil liability for damages, except as otherwise imposed by law.
Section 3. Severability. If any section, subsequent subdivision, paragraph, sentence, clause or phrase of this Ordinance is for any reason held to be unconstitutional or otherwise invalid, such a decision shall not affect the validity of the remaining portions of this Ordinance. City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance irrespective of the unconstitutionality or invalidity of any section, subsection, subdivision, paragraph, sentence, clause or phrase.
Section 4. Effective Date. This Ordinance shall take legal effect 30 days from and after the date of its passage.
Section 5. Publication. Within fifteen days of the adoption of this Ordinance, the City Clerk shall make a copy of this Ordinance to be published in full accordance with Section 36933 of the Government Code.
338
THIS ORDINANCE was introduced at a
regular meeting of the City Council of the
City of Lathrop on the 13th day of July 2026, and was PASSED AND ADOPTED at a regular meeting of the City Council of the City of Lathrop on the day of 20 , by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
Paul Akinjo, Mayor
ATTEST: APPROVED AS TO FORM:
Teresa Vargas
City Clerk
Salvador Navarrete
City Attorney
339
Language Removed will be shown in strikethrough
Revised Language will be shown in underline
Title 10. Vehicles and Traffic
Chapter 10. 24 PARKING
1 10. 24. 030 Designated No Parking Areas
EXHIBIT A
Upon amendment by ordinance prohibiting parking on certain streets and/ or highways within the corporate limits of the City, as depicted below, the Director of Public Works is directed to place appropriate signs and/ or markings sufficient to give adequate notice of such no parking areas. Until appropriate signs and/ or markings sufficient to give adequate notice of such no parking areas, as depicted below, is provided by the Director of Public Works, no enforcement of the provisions of this section shall occur.
Pursuant to the provisions of the California Vehicle Code, the following no parking zones ( unless noted as time - limited parking) are created or affirmed if previously created in the corporate limits of the City of Lathrop:
Street Side Location
Academy Drive North Beginning at the centerline of Somerston Parkway, thence running easterly to the centerline of River Bend Drive, an approximate distance of 2, 000 feet.
Barbara Terry Boulevard Both Beginning at the centerline of Spartan Way, thence running easterly to the centerline of Sunol Street, an approximate distance of 5, 860 feet.
Bewick Drive Both Beginning at the centerline of Warbler Place, thence running southerly to the centerline of Isidore Way, an approximate distance of 170 feet.
Bluebird Street Both Beginning at the centerline of Spartan Way, thence running southerly to the centerline of Osprey Drive, an approximate distance of 180 feet.
Bosch Avenue Both Beginning at the centerline of Middlebury Drive, thence running northerly to the centerline of Mulholland Drive, an approximate distance of 1, 850 feet.
Briarstone Lane Both Entire length.
Brookhurst Boulevard Both Beginning at the centerline of Manthey Road, thence running westerly to the centerline of McKee Boulevard, an approximate distance of 1, 350 feet.
Business Park Court Both Entire length.
Callerton Avenue Both Entire length.
Cedar Ridge Court Southwest Beginning from the south end of the driveway to 14917 Cedar Ridge Court, thence running easterly an approximate distance of 30 feet.
Central Pacific Street Both Beginning at the centerline of Spartan Way, thence running southerly to the centerline of Albany Street, an approximate distance of 200 feet.
Christopher Way Both Beginning at the centerline of D' Arcy Parkway, thence running southwesterly an approximate distance of 3, 000 feet.
Commercial Street Both Beginning at the centerline ofAcademy Drive, thence running northerly to the centerline of Marina Drive, an approximate distance of 1, 300 feet.
Crescent Moon Drive North Beginning at the centerline of McKee Boulevard, thence running easterly, an approximate distance of 50 feet.
D' Arcy Parkway North Entire length.
D' Arcy Parkway South Beginning at the centerline of Harlan Road, thence running easterly, an approximate distance of 450 feet. Allow 30 minute parking.
D' Arcy Parkway South Beginning at 450 feet east of the centerline of Harlan Road Boulevard, thence running easterly, an approximate distance of 6, 300 feet.
Dell' Osso Drive Both Entire length.
340
Street Side Location
Dos Reis Road Both Entire length.
Fifth Street East Beginning at the centerline of Thomsen Road, thence running southerly an approximate distance of 165 feet.
Fifth Street West Beginning at the centerline of Mingo Way, thence running southerly to the centerline of Louise Avenue, an approximate distance of 500 feet.
Fifth Street West Beginning at the centerline of N Street, thence running southerly to the centerline of O Street, an approximate distance of 400 feet. Prohibit parking between the hours of 8: 30 a. m. to 2: 30 p. m., Monday through Friday. Allow temporary loading/ unloading of vehicle passengers between the hours of 8: 00 a. m. to 8: 30 a. m. and 2: 30 p. m. to 3: 00 p. m., Monday through Friday. Allow parking between the hours of 3: 00 p. m. and 8: 00 a. m., Monday through Friday and anytime on Saturday and Sunday.
Golden Spike Trail West Beginning at the centerline of Brookhurst Boulevard, thence running north an approximate distance of 750 feet. Prohibit parking from the hours of 8: 00 a. m. to 5: 00 p. m., Monday through Friday. Allow parking between the hours of 5: 00 p. m. to 8: 00 a. m., Monday through Friday and anytime on Saturday and Sunday.
Golden Spike Trail East Beginning at the centerline of Brookhurst Boulevard, thence running north an approximate distance of 250 feet. Prohibit parking from the hours of 8: 00 a. m. to 5: 00 p. m., Monday through Friday. Allow parking between the hours of 5: 00 p. m. to 8: 00 a. m., Monday through Friday and anytime on Saturday and Sunday.
Golden Valley Parkway Both Entire length within city limits.
Glacier Street Both Entire length.
Harlan Road Both Beginning at the northerly city limits, thence running south to cul- de- sac.
Haverhill Lane Both Entire length.
Howland Road Both Entire length.
Imperial Drive West Beginning at the centerline of Holborn Drive, thence running southerly to Marina Drive roundabout, an approximate distance of 65 feet.
Isidore Way Both Beginning at the centerline of Stanford Crossing, thence running westerly to the centerline of Loon Street, an approximate distance of 930 feet.
Jefferson Way Both Entire length.
Johnson Ferry Road Both Beginning at the centerline of Golden Spike Trail, thence running easterly to centerline of Colonial Trail, an approximate distance of 1, 815 feet.
Lakeside Drive Both Entire length.
Lathrop Road Both Beginning at the centerline of Golden Valley Parkway, thence running easterly to the eastern city limits an approximate distance of 9, 500 feet.
Locomotive Street Both Beginning at the centerline of Golden Valley Parkway, thence running westerly to the centerline of Saybrook Street, an approximate distance of 200 feet.
Louise Avenue Both Entire length.
Madruga Road Both Beginning at the centerline of Yosemite Avenue, thence running westerly to the centerline of Glacier Street, an approximate distance of 770 feet.
Manthey Road Both Beginning at south city limits, thence running northerly to city limits an approximate distance of 28, 400 feet.
Marina Drive Both Beginning at the centerline of Somerston Parkway, thence running easterly to the centerline of River Bend Drive, an approximate distance of 2, 400 feet.
Marina Drive South Beginning at the centerline of Leto Way, thence running westerly to the centerline of Silver Springs Way, an approximate distance of 1, 050 feet.
McKee Boulevard Both Beginning at the centerline of Crescent Moon Drive, thence running northerly and southerly an approximate distance of 85 feet.
McKinley Avenue Both Entire length within City limits.
Mossdale Road Both Entire length within city limits.
Murphy Parkway Both Beginning at the centerline of D' Arcy Parkway, thence running northerly to the end.
Murphy Parkway Both Beginning at the centerline of Tesla Drive, thence running northerly to the centerline of D' Arcy Parkway, an approximate distance of 1, 500 feet. Allow parking during the hours from 6: 00 a. m. to 10: 00 p. m. Prohibit parking from 10: 00 p. m. to 6: 00 a. m. Prohibit parking of vehicles over 5 tons. 341
Street Side Location
Tesla Drive Both Beginning at the centerline of Harlan Road, thence running easterly to the centerline of Murphy Parkway, an approximate distance of 1, 530 feet.
Tesla Drive Both Beginning at the centerline of Murphy Parkway, thence running easterly to the centerline of Christopher Way, an approximate distance of 1, 900 feet. Allow parking during the hours from 6: 00 a. m. to 10: 00 p. m. Prohibit parking from 10: 00 p. m. to 6: 00 a. m. Prohibit parking of vehicles over 5 tons.
O Street North Beginning at an approximate distance of 125 feet east of the centerline of Halmar Lane, thence running easterly an approximate distance of 680 feet to Fifth Street.
Prohibit parking from the hours of 8: 30 a. m. and 2: 30 p. m., Monday through Friday. Allow temporary loading/ unloading of vehicle passengers from the hours of 8: 00 a. m. and 8: 30 a. m. and 2: 30 p. m. to 3: 00 p. m., Monday through Friday.
Allow parking between the hours of 3: 00 p. m. to 8: 00 a. m., Monday through Friday and anytime on Saturday and Sunday. Prohibit parking anytime 50 feet east and west of the centerline of Matador Way.
O Street South Beginning at an approximate distance of 90 feet west from the centerline of Matador Way, thence running west an approximate distance of 40 feet.
Oberlin Avenue Both Beginning at the centerline of Marina Drive, thence running northerly to the centerline of Garden Farms Avenue, an approximate distance of 1, 400 feet.
Old Harlan Road Both Entire length, north and south of Lathrop Road.
Old Harlan Road Both Entire length south of Louise Avenue.
Old Harlan Road East Beginning at the centerline of Louise Avenue, thence running north an approximate distance of 310 feet. Allow parking during the hours from 6: 00 a. m. to 10: 00 p. m. Prohibit parking from 10: 00 p. m. to 6: 00 a. m. Prohibit parking of vehicles over 5 tons.
Old Harlan Road West Beginning at an approximate distance of 100 feet south from the centerline of South Harlan Road, thence running south an approximate distance of 100 feet.
Allow parking during the hours from 6: 00 a. m. to 10: 00 p. m. Prohibit parking from 10: 00 p. m. to 6: 00 a. m. Prohibit parking of vehicles over 5 tons.
Paradise Road Both Entire length within city limits.
Pleasant Road Both Beginning at the centerline of Isidore Way, thence running southerly to the centerline of Folktale Way, an approximate distance of 180 feet.
Quartz Way East Beginning at the southerly boundary of 13580 Quartz Way ( lot 15), thence running southerly to the northern boundary of 13590 Quartz Way ( lot 14), an approximate distance of 20 feet for Emergency Vehicle Access.
Riptide Way Both Entire length.
River Islands Parkway Both Entire length within city limits.
Ro11 Tide Way Both Entire length.
Roth Road Both Entire length within city limits.
Sadler Oak Drive Both Entire length.
Sandhill Crane Road Both Entire length.
Seventh Street Both Beginning at the centerline of Fifth Street, thence running easterly along Seventh Street for an approximate distance of 600 feet.
Sierra Mar Road Both Beginning at the centerline of Barbara Terry Boulevard, thence running westerly to the centerline of Testarossa Street, an approximate distance of 175 feet.
Somerston Parkway Both Entire length.
Somerville Street Both Entire length
Spartan Way Both Beginning at the centerline of Golden Valley Parkway, thence running westerly to an approximate distance of 850 feet north of the centerline of Hidden Cove Place.
Stanford Crossing Drive Both Entire length.
Stewart Road Both Beginning at a point 550 feet north of the centerline of the Union Pacific Railroad tracks ( formerly southern Pacific Railroad tracks), thence running southerly along Stewart Road an approximate distance of 1, 450 feet to the centerline of Manthey Road.
Stonebridge Lane Both Beginning at a point that is on the east right- of- way line of Harlan Road, thence running easterly to the centerline of Slate Street, an approximate distance of 2, 400 feet.
342
Street Side Location
Thomsen Road Both Beginning at the east right- of- way of Harlan Road, thence running easterly for an approximate distance of 200 feet.
Thomsen Road South Beginning at a point approximately 200 feet east of the right- of- way of Harlan Road, thence running easterly an approximate distance of 400 feet to the centerline of Lisa Lane. Allow parking during the hours from 6: 00 a. m. to 10: 00 p. m. Prohibit parking from 10: 00 p. m. to 6: 00 a. m.
Thomsen Road North Beginning at a point approximately 200 feet east of the right- of- way of Harlan Road, thence running easterly an approximate distance of 200 feet. Allow parking during the hours from 6: 00 a. m. to 10: 00 p. m. Prohibit parking from 10: 00 p. m. to 6: 00 a. m.
Top of San Joaquin
River levee in RD - 17
and all levee access
points
Both Beginning at the northern city limit line, following the levee until the centerline of Manthey Road.
Towne Centre Drive Both Beginning at the centerline of Manthey Road, thence westerly to the centerline of Golden Valley Parkway. Allow parking for up to two hours between 6: 00 a. m. to 10: 00 p. m. Prohibit parking between the hours of 10: 00 p. m. and 6: 00 a. m.
Towne Centre Drive Both Beginning at the centerline of Golden Valley Parkway, thence running westerly an approximate distance of 400 feet.
Winton Avenue Both Entire length.
Woodfield Drive Both Beginning at the centerline of Lathrop Road, thence running northerly to the centerline of Long Barn Drive, an approximate distance of 450 feet.
Yosemite Avenue North Beginning at the centerline of McKinley Avenue, thence running easterly to city limits.
Yosemite Avenue Both Beginning at the centerline of McKinley Avenue, thence running westerly to the centerline of Jefferson Way.
Yosemite Court Both Entire Length, prohibit parking of vehicles over 5 tons.
The public works director is hereby directed to erect appropriate signage and/ or markings to indicate the existence of these no parking zones. In erecting signage on roads with unimproved shoulders, the signs shall be placed at the edge of the rightof- way. Until and unless appropriate signage and/ or markings are erected, no enforcement of these no parking zones shall occur. Payment for such signage shall come from account 208- 5010. (Ord. 93- 104; Ord. 99- 166; Ord. 08- 282 § 1; Ord. 09- 288 § 1; Ord. 09- 296 § 1; Ord. 10- 301 § 1; Ord. 10- 302 § 1; Ord. 11- 304 § 1; Ord. 11- 306 § 1; Ord. 11- 309 § 1; Ord. 12- 317 § 1; Ord. 13- 325 § 1; Ord. 14- 336 § 1; Ord. 17- 382 § 1; Ord. 18- 389 § 1; Ord. 20- 417 § 1; Ord. 22- 430 § 1; Ord. 24- 454, 1/ 8/ 2024; Ord. 25- 465, 4/ 14/ 2025; Ord. 25- 468, 7/ 14/ 2025) 343
PAGE LEFT
INTENTIONALLY
BLANK
344
345
346
347
348
349
350
351
352