CDD Template Version 1.1
Condition Timing Responsible
Party Status
58. The Applicant shall review options with Community Development staff to minimize visual impacts and monotony in the design of any sound walls. If used, walls should be constructed of masonry and utilize graffiti resistant materials. Wall design and materials shall be subject City’s approval and according to the design standards in the approved Village 1 Specific Plan and General Development Plan.
Prior to
Improvement
Plans and Final
Map
Community
Development
IMPROVEMENT PLAN NOTES
59. Dust control measures shall be established prior to construction of any phase of development pursuant to the requirements of the Mitigation Monitoring Plan. Additional dust control measures may be required by the City Engineer based upon site conditions.
The following note shall be added to the Grading and/or Improvement Plans:
“To minimize dust/grading impacts during construction, the Applicant shall:
a. Spray water on all exposed earth surfaces during clearing, grading, earth moving and other site preparation activities throughout the day.
b. Use tarpaulins or other effective covers on all stockpiled earth material and on all haul trucks.
c. Sweep the adjacent streets frontages at least once a day or as needed to remove silt and other dirt which is evident from construction activities. d. Ensure that construction vehicles are cleaned prior to leaving the construction site to prevent dust and dirt from being tracked off-site.
e. The City shall have the authority to stop all grading operations, if in opinion of City staff, inadequate dust control measures are being practiced or excessive wind conditions contribute to fugitive dust emissions.
The grading shall comply with the Mitigation Monitoring Program.” Prior to
approval of
Improvement
Plans
Development
Engineering
and City
Engineer
298
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
60. A note shall be added to the Grading Plans that states:
“Prior to the commencement of grading operations, the contractor shall identify the site from where the deficit earthen material shall be borrowed. A report issued by a geotechnical engineer shall be submitted to verify that the imported materials are suitable for project fill. If the borrow site is within the City of Lincoln, the contractor shall show proof of all approved Grading Plans. Haul routes to be used shall be approved by the City Engineer.”
Prior to
approval of
Grading Plans
Development
Engineering
and City
Engineer
61. A note shall be added to the Improvement Plans:
“Construction in the project shall take place between the hours of 7:00 A.M. to 5:00 P.M., Monday through Friday, unless written approval is granted by the Community Development Department for private property and the City Engineer for mass grading and public improvements, allowing work for different days or hours.” “Radios and other musical equipment noise shall be played at levels consistent with the City of Lincoln standards so as to be contained on-site.”
Prior to
approval of
Improvement
Plans
Development
Engineering
and City
Engineer
62. A note shall be added to the Improvement Plans:
“All contractors are required to deliver all construction related refuse collected in debris boxes to the Western Placer Waste Management Authority Material Recovery Facility.
The City reserves the right to require that a franchise agreement be approved with any refuse handler at any time during the construction process.” Prior to
approval of
Improvement
Plans
Development
Engineering
and City
Engineer
63. A note shall be added to the Improvement Plans:
“Seventy-two (72) hour notification must be given to the City of Lincoln prior to disinfection of any water mains. The contractor shall coordinate with the City Construction Inspector to schedule with the Public Services Department at (916) 434- 2450 for disinfection and testing.”
Prior to
approval of
Improvement
Plans
Development
Engineering
and City
Engineer
299
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
64. A note shall be added to the Improvement Plans:
“The Applicant shall submit environmental surveys in compliance with the mitigation measures. The Applicant shall secure Community Development Department (Planning) approval that surveys are adequate and mitigation measures are incorporated into the Plan prior to start of any on-site construction.”
Prior to
approval of
Improvement
Plans
Community
Development
and City
Engineer
65. A note shall be added to the Improvement Plans:
“The Applicant shall require their contractors to work with the Police Department in the development of security measures during construction to increase security of stored equipment and materials on-site and to minimize demands on police protection services during project construction.”
Prior to
approval of
Improvement
Plans
Development
Engineering
and City
Engineer
66. A note shall be added to the Improvement Plans:
“All construction contractors shall provide a Spill Prevention and Counter Measure Plan describing measures to ensure proper collection and disposal of all pollutants handled or produced on the project site during construction, including sanitary wastes, cement, and petroleum products. The Plan shall be submitted to the City’s Fire Department and City Engineer prior to each phase of construction.”
Prior to
approval of
Improvement
Plans
Development
Engineering
and City
Engineer
FINAL MAP
67. If any public improvements required by the City pursuant to this subdivision or local ordinance have not been completed and accepted in accordance with conditional approval of the tentative map, the City, as a condition precedent to the approval of the final map, shall require the subdivider to enter into a mutually agreeable terms to complete the improvements in a manner authorized by Government Code Sections 66462(a) and 66499.5. The Applicant shall provide security, in one of the standard forms acceptable to the City Attorney and consistent with the Subdivision Map Act guaranteeing construction of the improvements.
Prior to Final
Map approval
Community
Development,
City Engineer
300
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
68. Arrangements shall be made by the Applicant during the review of final maps by the City for the abandonment of any existing easements and/or right-of-way no longer required as well as arrangements for the dedication of new easements and/or rights-or-way required to carry out project conditions of approval. Separate document easements required by the City shall be prepared by a licensed land surveyor and submitted for review by the City Surveyor, Community Development Department and City Engineer.
Prior to Final
Map approval
Community
Development
and City
Engineer
69. The Landowner shall convey all groundwater rights to the City of Lincoln with the recordation of any final maps.
Prior to Final
Map approval
Community
Development
and City
Engineer
70. The Landowner shall dedicate public utility easements for underground facilities of a size established by City Standards and Specifications and consistent with the City’s franchise agreements as part of each final map.
Prior to Final
Map approval
Community
Development
and City
Engineer
71. The words “traffic control appurtenances” shall be included on the cover sheet of any final map in the list of utilities allowed in public utility easements (PUE’s) located along public roads.
Prior to Final
Map approval
Development
Engineering
and City
Engineer
301
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
72. The Landowner shall provide or annex into a funding mechanism for the annual maintenance and operation of public streets, streetlights, parks, landscaping, open space, water quality features, storm drain facilities, detention and/or retention facilities, and traffic signals. This funding mechanism may consist of a Special Tax, Assessment District, or endowment, at the discretion of the City. If the project is within a current finance mechanism such as Benefit Assessment District No. 1, or CFD 2018-1, an expenditure/ revenue analysis should be completed if the number of units or amount of public improvements to be maintained have changed since preliminary approval to ensure the project will cover the costs of the annual maintenance and operation of the public improvements. Compliance with this condition shall be to the satisfaction of the City Engineer. Annually the costs will be allocated proportionately against the individual lots in accordance with the benefits received. Annual adjustments shall be applied in accordance with the Consumer Price Index plus 3% as determined by the City to adjust the assessment for inflation as needed to meet any actual increased costs. Annexation into CFD 2018-1 could satisfy this condition.
Prior to Final
Map approval
Community
Development,
Support
Services and
City Engineer
73. The Landowner shall provide or annex into a funding mechanism for the additional demand on public safety and public library, etc. This funding may consist of annexation to CFD 2018-2 or other funding mechanism as is acceptable to the City. A fiscal impact analysis should be completed to ensure the project will cover the costs of the additional services needed. Compliance with this condition shall be to the satisfaction of the Finance Director and Community Development Director. Annually the costs will be allocated proportionately against the individual lots in accordance with the benefits received. Annual adjustments shall be applied in accordance with the Consumer Price Index plus 3% as determined by the City to adjust the assessment for inflation as needed to meet any actual increased costs.
Prior to Final
Map approval
Community
Development,
Support
Services and
City Engineer
302
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
74. The Applicant will participate in the City’s Public Facilities Element (PFE) Fee program current at the time of issuance of each building permit.
Issuance of
Each Building
Permit
Community
Development
75. The project is subject to the Village 1 Specific Plan Infrastructure Master and Finance Plan Area Fee, or the Interim Fee Agreement for the Village 1 Specific Plan Infrastructure Financing Plan, whichever is in effect at the time of first final map approval.
Prior to first
Small-Lot Final
Map approval
Planning &
Developmen
t Engineering
76. If required, the Applicant with the assistance of the Fire Department and Community Development Department shall develop a Wildland Fire Management Program. The Plan shall provide for the maintenance of undisturbed vegetation in open space areas located on the project site on an annual basis and be submitted to the City Police/Fire Department for approval prior to the recordation of any Final Small Lot Maps.
Prior to
recordation of
any Final Map
approval
Planning, Fire
77. The Applicant shall provide to the Community Development Department copies of the final maps for each phase after the City Engineer’s approval but prior to City Council approval:
• Two digital copies of the final map in DWG format compatible with the City’s mapping and PDF
• One plot or print of the submittal
Prior to Final
Map approval
Community
Development
and City
Engineer
78. Prior to City approval of a final map, the Applicant shall file with the Placer County Clerk, a certificate from the Placer County Tax Collector’s Office indicating that no liens against the subdivision or any part thereof exist for unpaid state, county, municipal or local taxes or special assessments collected with taxes, except those not yet due and payable.
Prior to Final
Map Approval
Development
Engineering
and City
Engineer
303
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
79. After recordation of any final map, the Applicant shall provide to the City Engineer one copy of the recorded final map.
Immediately
after
recordation of
Final Map
Community
Development
and City
Engineer
80. Dedicate rights of ways and easements for public improvements, open space and park lots shown on the small lot final map/s and construct those improvements or enter into a subdivision improvement agreement with bonds, pursuant to Lincoln Design Criteria and Procedures Manual, to the satisfaction of the City Engineer.
Concurrent
with filing the
Small Lot Final
Maps
Development
Engineering
and City
Engineer
81. **Approval of the Final subdivision map is subject to dedication of an easement for public street & highway purposes and public utility easements as noted on the approved tentative subdivision map.
General
Condition/Conc
urrent with First
Final Map
Development
Engineering,
City Engineer
82. ** Applicant shall be required to design, construct & bond for the primary public street connection as per the approved tentative subdivision map to the satisfaction of the City Engineer.
Prior to
Improvement
Plan
approval/Final
Map approval
Development
Engineering,
City Engineer
83. The Development Agreement shall address the obligation of the Applicant to reimburse for facilities constructed by third partiers which benefit the Applicant, if any, as well as provide Applicant with reimbursement rights for facilities constructed by Applicant which benefit third parties
Prior to
Recordation of
Final Map
Community
Development
& City
Engineer
84. The Applicant shall comply with the General Plan, Village 1 Plan Area Fees or Interim Fee Agreement, and Development Agreement regarding Park Dedication and Fees, if applicable.
Prior to
approval of the
each Final Map
Planning
PRIOR TO CONSTRUCTION
304
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
85. The Applicant shall apply for and obtain an Encroachment Permit from the City Engineer prior to any work conducted within the existing public right-of-way.
Prior to
beginning
construction
City Engineer
86. The Applicant shall obtain necessary approvals and permit from the County of Placer for the proposed sewer connection to the existing 42-inch sewer line on McBean Parkway.
Prior to
Acceptance of
Improvements
City Engineer
87. Prior to performing construction activities within the project area and prior to each phase of development, the Applicant shall submit a construction schedule to the Fire Department to allow coordination of fire protection services during construction.
Prior to any
construction
activity
City Engineer
and Fire
Department
88. The Applicant shall consult/notify with the service provider of gas, telephone, cable and Electrical System Design Departments at the earliest available opportunity concerning all applicable development plans, site improvements, and construction schedules. The Applicant or IT contractor shall maintain contact with the service providers so that required facilities and easements will be developed in a coordinated manner.
Prior to
construction
City Engineer
89. An on-site meeting with the Applicant, contractor, superintendent, engineers, and City representatives to review special procedures, limits of work, lines of authority and special conditions or procedures shall take place prior to any significant grading activity. The Applicant shall provide an organizational chart displaying lines of authority and phone numbers for each individual shown in a supervisory capacity. The Applicant shall designate in writing before the start of work an authorized representative who will have authority to act on behalf of the project. Said representative should be available on the job site during all construction or accessible by phone. The representative shall also make any necessary arrangements with the City Engineer concerning extended or emergency work periods.
Prior to any
construction
City Engineer
90. All construction haul routes shall be approved by the City Engineer prior to commencement of any construction activity.
Prior to any
construction
City Engineer
305
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
91. The Applicant shall coordinate the placement of centralized mail delivery units, if required by the Post Office or provide verification that centralized mail delivery units will not be required by the Post Office. The placement of the units, if required by the Post Office, shall consider concepts of defensible space, such as street lighting and visibility, ADA accessibility, as well as consumer convenience. The centralized mail delivery units shall not be located within any of the water quality LID areas identified on the Subdivision Map and/or Improvement Plans.
Prior to any
construction
Community
Development
DURING CONSTRUCTION
92. Consistent with the recommendations of a soils engineer and as approved by the City Engineer, grading should be scheduled to avoid seasonally high groundwater conditions in swale areas, to the extent feasible.
During
Construction
City Engineer
93. Applicant shall provide a specific geotechnical analysis to determine the suitability of excavated material (if proposed for use) as engineered fill, and trench backfilling, topsoil, or other types of reuse on-site such as landscaping fill in parks. If during construction the Applicant identifies any unique unforeseen soils conditions, the Applicant shall within 24- hours notify its geotechnical consultant to provide an analysis to the City Engineer for approval concerning any remediation action.
During
Construction
City Engineer
94. The Applicant/Contractor shall be responsible for the cleaning of all public streets impacted by Stardust 12 project construction. The manner and frequency of street cleaning shall be determined by the City Engineer based upon field conditions.
During
construction
City Engineer
95. For potable construction water, flows shall not exceed 500 gallons per minute and 500,000 gallons per day subject to approval by the City. All flows shall be metered and monitored by the Applicant. The cost of potable construction water shall be at a rate established by the City. Any use of potable water for construction shall be subject to availability as determined by the City.
During
construction
City Engineer
306
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
96. The project shall provide for a system to inform all contractors and subcontractors and other affiliated parties conducting business within the City that a Business License must be obtained from the City. Prior to the preconstruction meeting, the Applicant shall submit to the City of Lincoln a list containing all parties doing business within the City as a result of the project. The City will check the list to ensure that each party has obtained the necessary Business License.
Prior to
issuance of
Building
Permits and
during
construction
Building
97. The Applicant may place a temporary sales and/or construction building (trailer) on the project site during project construction, subject to approval of the Community Development Department. The Applicant shall submit information to the Community Development Department regarding the location and services available to the structure as well as elevations of the temporary facility. Use of the trailer will be subject to the approval of the Community Development Department.
During
construction
Building
PRIOR TO ACCEPTANCE
98. The Applicant, through its engineer or surveyor, shall set sufficient durable monuments to conform to the standards prescribed in Section 8771 of the Business and Professional Code of California, and street monuments in accordance with the City Design Criteria and Procedures manual.
Prior to
Acceptance of
Improvements
City Engineer
99. The Applicant shall provide the City with “As-Built Plans” in a mylar hard copy and the other on a computer disc in an AutoCAD format compatible with the City’s mapping acceptable to the City Engineer.
Prior to
Acceptance of
Improvements
City Engineer
100. Existing and proposed public facilities and improvements damaged during the course of construction shall be repaired by the Applicant, at his expense, to the satisfaction of the City Engineer.
Prior to Notice
of Completion
and Acceptance
of
Improvements
City Engineer
307
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
101. The contractor shall be responsible for the televising of all sewer collection and conveyance facilities. A 72-hour notification, both written and verbal, shall be given to the City Engineer prior to the televising of the sewer system. If not properly notified the City may elect to require a re-testing of the subject system.
Prior to Notice
of Completion
City Engineer
PRIOR TO BUILDING PERMIT
102. Finished exterior grades shall be sloped away from foundations to provide removal of surface water runoff away from structures. All building pads shall be provided with drainage away from foundations and to a properly controlled discharge system. No surface runoff should be allowed to flow from the pad over an unprotected slope.
Terraced lots should avoid uncontrolled discharge of surface water runoff onto adjoining lots.
Prior to
approval of
Plot Plans
Building,
Development
Engineering
103. Fire hydrants or other acceptable alternative approved by the City, providing service for construction sites shall be operational prior to combustible vertical building construction beginning.
Prior to
issuance of
Building
Permits
Building
104. All private exterior lighting is to be uniform or complimentary throughout the project.
Private exterior lighting to be provided for all access driveways, parking areas and walkways to facilitate protection of private property and safe pedestrian movement within the project site. Such lighting shall be accomplished in such a manner as not to illuminate adjacent properties or street which may be objectionable or hazardous.
Detailed Lighting Plans depicting the location and type of all lighting fixtures to be submitted and approved by the Building, Planning, and Police Department as part of the Construction Plans.
Prior to
issuance of
Building Permit
Community
Development,
Police
Department
308
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
105. The project shall pay the statutory school fees to Western Placer Unified School District school as required by the Leroy Green School Mitigation Fee Act.
Prior to
issuance of
Building
Permits
Building
106. The Applicant shall pay all applicable fees at time of issuance of the Building Permit. Prior to issuance of
Building
Permits
Building
107. The project shall pay the Placer County Capital Facilities Impact Fee to the City for pass through to the County.
Prior to
issuance of
Building
Permits
Building
108. The development of residential dwelling units shall be subject to the review and approval process of Design Review as set forth in the City’s Municipal Code.
Prior to the
issuance of the
Building
Permits
Planning
109. All water meters shall be installed by the Public Services Department as per standards and specifications adopted by the City of Lincoln in June 2004 and as thereafter amended.
A fee (applied city-wide) will be required for the cost and installation of each meter and may be adjusted annually based upon costs.
Prior to First
Inspection
following
issuance of
Building
Permits
Building and
Public
Services
PRIOR TO OCCUPANCY
309
Exhibit A
Stardust 12- Small Lot Tentative Subdivision Map Conditions of Approval
CDD Template Version 1.1
Condition Timing Responsible
Party Status
110. The Applicant shall install all fire protection measures required pursuant to the then applicable City Standards. All residential units shall be fire sprinkled in accordance with the 2022 California Fire Code, or the Fire Code in effect at the time of Building Permit application.
Prior to Final
Inspection /
Occupancy
Building
310
JT JT
3,675 SF
3,200 SF 3,200 SF3,200 SF 3,200 SF3,200 SF 3,200 SF 3,200 SF 2,400 SF 3,200 SF 3,200 SF 79,265 SF
5,957 SF
18,988 SF
3,400 SF 3,400 SF 3,400 SF
3,400 SF
5,599 SF
5,226 SF
3,360 SF
8,864 SF
3,600 SF
4,571 SF
4,217 SF
3,800 SF
3,896 SF
4,296 SF
3,576 SF
3,560 SF
3,560 SF
4,266 SF
3,580 SF
3,560 SF
3,601 SF
2,699 SF
6,172 SF
3,560 SF
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
75 26
84 83
27 28
29 30
67 68 69 70
66 63
65 64
73 74
61 60
59 77
76 82
48 49 50 51 52 53 54 55 56 57 58
62 78
79 80
81 31
32333435363738394041424344454647
72 1
2 3
4 5
6 7
8 9
71 103'
96'
85'
89'
88'
87'
86'
40'
40'
40'
80'
85' 80' 80' 80' 80' 79' 83' 80'
121'
93'
95'
95'
95'
92'
90'
125'
30'
30'
84'
90'90'90'90'90'90'90'90'90'90'90'90'90'90'
90'
40' 40' 40' 40' 40' 40' 40'
83' 83' 83' 84' 84' 85' 85' 85' 85'
40' 40' 40' 40' 40' 40' 40' 40' 40'
40' 40' 40' 40'
92'
52' 40'
85'85'81'
40'
40'
40'
41'
53'
58'
41'
42' 44'
80' 80' 80'
40'
44'
94' 94'
52' 42' 44' 50'
57'
44'
44'
44'
55'
80' 80'
80'
80'
80'
44'
44'
40'
44'
44' 44'
44'
44'
65'
65'
65'
65'
30'
122'
25'99'48'40'40'40'40'40'40'40'40'40'40'40'40'40'44'198' 104'
50'
40'
40'
40'
40'
67'
74'
56' 86' 40' 40' 40' 40' 40' 30' 40' 40' 40' 40' 46' 100' 27' 95'
40'
54'
80'
83'
75'
40'
14'
77' 50'
80'
85'
55'
61'
80' 80'
53'
55'
80' 80'
55'
92' 140' 140' 95'
92' 92' 95' 95'
9'
38'
22'
8'
38'
17'
53'
85'
55'
81' 80' 80' 80' 80' 80' 86'
40' 40' 30' 40' 40' 40'
40'
44' 40'
85'
948'
82'
950'
84'
4,666 SF 4,281 SF
6,187 SF
7,673 SF
5,737 SF3,263 SF
4,872 SF
40' 31'
30'
40' 40' 40' 40' 40' 40'
42'
65'
80'
80'
80'
52' 41' 42'
40'
936'
590'
592'
65'
40'
40'
40'
7,891 SF
4,065 SF 5,760 SF
5,045 SF 3,324 SF3,372 SF
3,565 SF
4,333 SF
3,522 SF
3,485 SF
3,560 SF
3,208 SF
4,477 SF 4,295 SF 3,336 SF
3,698 SF
3,345 SF 3,363 SF 3,381 SF 3,398 SF
3,698 SF 4,780 SF
3,370 SF
3,643 SF
3,404 SF 3,552 SF
6,184 SF
40'
32'
30'
33'
80'
40' 40'
40'
40' 40'
80'
65'
82'
67'
3,597 SF
96'
52' 40' 40' 40' 40' 55'
40'
3,201 SF
42' 50'
30'
3,964 SF 3,603 SF 3,603 SF3,603 SF 3,602 SF 3,602 SF3,603 SF 3,602 SF 3,602 SF3,602 SF 3,844 SF3,601 SF 3,601 SF 3,601 SF 40'
25'
40' 40' 40' 40' 40'
STREET A
STREET C
COURT A
44'
44'
44'
STREET E
44'
44'
44'
44' 44'
STREET B
44' 44'
44'
LOT D
E.V.A.
0.1 ± AC.
1.8 ± AC.
LOT B
W.Q. BASIN
0.4 ± AC.
C
C
B
AVILA
031-460-085-000
VARMAN
031-460-055-000
STARDUST 80
021-274-040-000
(FUTURE TENTATIVE MAP)
LEAVELL
021-274-065-000
SUNSET TARTESSO LLC
021-750-019-000
McBEAN PARK DRIVE
(84) 40'x80' (TYP.)
10.4 ± AC.
UNIT 1
A
STARDUST LANE (EXISTING PRIVATE ROAD)
25' P.U.E. &
L.S.E.
12.5' P.U.E.
12.5' P.U.E.
12.5' P.U.E.
12.5' P.U.E.
25' P.U.E. &
L.S.E.
44'
C
C
C
44'
44' 44'50'
R=400'
R=400'
R=250'
STREET D
0.1 ± AC.
GATE OR
KNOCK-DOWN
BOLLARDS
McBEAN PARK DRIVE
CENTERLINE
PG&E EASEMENT
PER 20190066775
(TO REMAIN)
EASEMENT PER
598 OR 336
(TO REMAIN)
LOT A
WATER QUALITY/
LANDSCAPE
LOT C
UTILITY
CORRIDOR
R=400'R=400'R=300'R=300'
LEAVELL RANCH ROAD
R=50' R=50'
R=50'
R=25'
R=25'
R=25'
R=50'
B
50'
30' UTILITY ESMT. &
PEDESTRIAN
ACCESS ESMT. /
ALTERNATE E.V.A.
EP
PROPOSED 50'
I.O.D. FOR PUBLIC
STREET & HWY
PURPOSES
PROPOSED
STREET
SCALE: 1"=15'
*ARTERIAL (SR 193/McBEAN PARK DRIVE) - ULTIMATE CONDITION 105' PUBLIC STREET EASEMENTA
14'13'
MEDIANTRAVEL LANE
40'
8' 12'
BIKE LANE
/SHOULDER
TRAVEL LANE
40'
CLC
EPEP
80'
STREET
TREES (TYP.)
DRAINAGE
(TYP.)
25'
P.U.E./L.S.E.
13'
TRAVEL LANE
12'
TRAVEL LANE BIKE LANE
/SHOULDER
8'
25'
P.U.E./L.S.E.
MULTIUSE
TRAIL
(MEANDERS)
8'
MAX.
DRAINAGE
DITCH
WIDTH
8'
* REFER TO GEOMETRIC APPROVAL DRAWING ACCOMPANYING SUBMITTAL FOR INTERIM VS. ULTIMATE IMPROVEMENTS BY OTHERS.
PLEP
PSE PSE
105'
SIERRA COLLEGE BLVD
STARDUST LANE
STAGECOACH LANE
HEATHER
193
MCBEAN PARK DRIVE
PROJECT
SITE
DRIVE
LEAVELL RANCH
ROAD
GREEN HOLLOW
DRIVE
SCALE: 1"=15'
PRIMARY RESIDENTIAL (WITH ON-STREET PARKING)
50' PUBLIC STREET EASEMENTB
* REFER TO GEOMETRIC APPROVAL DRAWING ACCOMPANYING SUBMITTAL FOR INTERIM VS. ULTIMATE IMPROVEMENTS BY OTHERS.
STREET
TREES (TYP.)
18' 3'
25'
12.5'
P.U.E.
4'
WALKTRAVEL LANE
18'3'
25'
12.5'
P.U.E.
4'
WALK TRAVEL LANE
CLC
PSEPSE
50'
PARKING
(TYP.)
C/G C/G
MINOR RESIDENTIAL (WITH ON-STREET PARKING)
SCALE: 1"=15'
44' PUBLIC STREET EASEMENTC
STREET
TREES (TYP.)
15' 3'
22'
12.5'
P.U.E.
4'
WALKTRAVEL LANE
15'3'
22'
12.5'
P.U.E.
4'
WALK TRAVEL LANE
CLC
PSEPSE
44'
PARKING
(TYP.)
C/G C/G
50 FT.
RADIUS
50 FT.
RADIUS
50 FT.
RADIUS
50 FT.RADIUS
OFFSET
CUL-DE-SAC
CONVENTIONAL
CUL-DE-SAC
44 FT.
R/W
25 FT.
RADIUS
50 FT.RADIUS
30 FT.
RADIUS
44 FT.
R/W
TENTATIVE SUBDIVISION MAP
STARDUST 12
CITY OF LINCOLN, CALIFORNIA
FEBRUARY 20, 2026
STARDUST 12 - TENTATIVE SUBDIVISION MAP
BUILDING RELATIONSHIPS ONE PROJECT AT A TIME
3741 Douglas Blvd, Suite 150 Tel 916.341.7760
Fax 916.341.7767Roseville, CA 9581660
1200
NORTH 240
NOTE:
1) SUBDIVIDER(S) RESERVES THE RIGHT TO FILE MULTIPLE FINAL MAPS PURSUANT TO SECTION 66456.1 OF THE SUBDIVISION MAP ACT.
2) EXISTING TOPOGRAPHY PROVIDED BY WOOD RODGERS AND WAS FLOWN IN 2024. CITY OF LINCOLN BENCHMARK "LIN-8A."
3) UNLESS OTHERWISE SHOWN ON MAP, ALL UTILITIES WILL BE INSTALLED WITHIN THE PUBLIC ROAD RIGHT-OF-WAY OR WITHIN A PUBLIC UTILITY EASEMENT.
4) ALL EXISTING RECORDED EASEMENTS ON THE PROPERTY HAVE BEEN VERIFIED AND ARE SHOWN HEREON.
5) OWNER WILL DEDICATE ALL EASEMENTS AND LETTERED LOTS NECESSARY TO PROVIDE ALL ONSITE UTILITIES AND ROADWAYS.
6) A 12.5' P.U.E. SHALL BE LOCATED ADJACENT TO ALL PUBLIC STREETS UNLESS OTHERWISE SHOWN ON THIS TENTATIVE SUBDIVISION MAP.
7) THIS IS AN APPLICATION FOR A DEVELOPMENT PERMIT.
8) ALL EXISTING STRUCTURES AND SEPTIC SYSTEMS TO BE REMOVED. EXISTING WELLS TO BE REMOVED OR TO REMAIN AS NOTED.
9) THIS EXHIBIT IS FOR TENTATIVE MAP PURPOSES ONLY. ALL SITE CHARACTERISTICS ARE TO BE VERIFIED PRIOR TO FINAL MAP.
10) MASTER UTILITY STUDIES WILL BE PROVIDED AT THE TIME OF VILLAGE IMPROVEMENT PLAN SUBMITTAL. 11) LOT LINES MAY BE ADJUSTED AT THE TIME OF FINAL MAP PROVIDED THAT NO ADDITIONAL LOTS ARE
CREATED AND RESULTING DESIGN IS IN SUBSTANTIAL CONFORMANCE WITH THIS TENTATIVE SUBDIVISION MAP. FUTURE PUBLIC LOTS ARE NOT TO BE COUNTED AS "LOTS" TOWARD ANY FUTURE BOUNDARY LINE ADJUSTMENT.
12) FINAL SUBDIVISION MAPPING SHALL BE PREPARED TO IDENTIFY ALL R/W, IOD'S, AND/OR
PUBLIC/PRIVATE STREETS, IF ANY, NEEDED TO ACCOMMODATE THE CONSTRUCTION PHASING OF THE VILLAGES SHOWN ON THIS TENTATIVE MAP.
13) ALL PUBLIC STREETS, LIGHTS, AND DRAINAGE FACILITIES TO BE DESIGNED AND CONSTRUCTED PER CITY STANDARDS, EXCEPT AS SHOWN OTHERWISE HEREON.
14)
LOTS 26-31 WILL RELINQUISH ACCESS RIGHTS TO STARDUST LANE.
RECORD OWNER
GUERTIN, JAMES B
PO BOX 355
LINCOLN, CA 95648
PHONE: (916) 257-3936
APPLICANT/DEVELOPER
JEN CALIFORNIA 28, LLC
1478 STONE POINT DRIVE, SUITE 100
ROSEVILLE, CA 95661
CONTACT: JOHN JEWETT
PHONE: (530) 550-5525
PLANNER/ENGINEER
WOOD RODGERS INC.
3741 DOUGLAS BLVD, SUITE 150
ROSEVILLE, CA 95661
CONTACT:
PLANNER: VANCE JONES
ENGINEER: JASON REED, PE C66631
PHONE: (916) 341-7760
ASSESSOR'S PARCEL NUMBERS
021-274-038, -039
AREA
12.8 ± ACRES GROSS
RESIDENTIAL LOT SIZES
AVERAGE: 4,029 SQ. FT.
MAXIMUM: 8,864 SQ. FT.
MINIMUM: 3,200 SQ. FT.
LOT COUNT SUMMARY
84 SINGLE FAMILY RESIDENTIAL LOTS
2 WATER QUALITY/LANDSCAPE LOTS
1 UTILITY & PEDESTRIAN ACCESS LOT
1 EMERGENCY VEHICLE ACCESS LOT
88 LOTS TOTAL
EXISTING GENERAL PLAN LAND USE
COUNTRY ESTATES (CE)
LOW DENSITY RESIDENTIAL (LDR)
OPEN SPACE (OS)
PROPOSED GENERAL PLAN LAND USE
MEDIUM DENSITY RESIDENTIAL (MDR)
OPEN SPACE (OS)
EXISTING ZONING
VILLAGE COUNTRY ESTATES (VCE)
VILLAGE LOW DENSITY RESIDENTIAL (VLDR)
VILLAGE OPEN SPACE (VOS)
PROPOSED ZONING
VILLAGE MEDIUM DENSITY RESIDENTIAL
(VMDR)
VILLAGE OPEN SPACE (OS)
PARKS & RECREATION
CITY OF LINCOLN
POLICE & FIRE PROTECTION
CITY OF LINCOLN
SCHOOL DISTRICT
WESTERN PLACER UNIFIED SCHOOL DISTRICT
SEWER
CITY OF LINCOLN
STORM DRAIN
CITY OF LINCOLN
WATER
CITY OF LINCOLN
ELECTRICITY
PG&E
NATURAL GAS
PG&E
PROJECT NOTES
LOCATION MAP
LOT SUMMARY
nts
SHEET 1 OF 4
NORTH
DETAIL 1: CUL-DE-SAC
DETAIL 2: ELBOW
1"=60'
1"=60'
SURVEYOR'S STATEMENT
THE BOUNDARY SHOWN HEREON IS
BASED ON THE LEGAL DESCRIPTION AS
DESCRIBED IN THE PRELIMINARY TITLE
REPORT PREPARED BY PLACER TITLE
COMPANY, ORDER NO. P-625666
DATED MARCH 8, 2024. ALL EASEMENTS
SHOWN IN THE REPORT ARE SHOWN
HEREON OR IF AN EASEMENT IS NOT
PLOTTABLE OR BLANKET, A NOTE TO
THAT EFFECT IS SHOWN HEREON. ANY
PUBLIC EASEMENTS TO BE ABANDONED
ARE SHOWN AS "TO BE ABANDONED
WITH FINAL MAP (IF APPLICABLE)."
EXHIBIT B
311
BUILDING RELATIONSHIPS ONE PROJECT AT A TIME
3741 Douglas Blvd, Ste 150Tel 916.341.7760
Fax 916.341.7767 Roseville, CA 95661
EXHIBIT B
312
BUILDING RELATIONSHIPS ONE PROJECT AT A TIME
3741 Douglas Blvd, Ste 150Tel 916.341.7760
Fax 916.341.7767 Roseville, CA 95661
EXHIBIT B
313
DEVELOPING INNOVATIVE DESIGN SOLUTIONS
3301 C St, Bldg. 100-B Tel 916.341.7760
Fax 916.341.7767 Sacramento, CA 95816
EXHIBIT B
314
SUBJECT:
West Lincoln Square Commercial Project (Thomas
Cruickshank)
SUBMITTED BY:
Tom Cruickshank
DEPARTMENT:
Community Development
DATE:
April 28, 2026
Item Number 14.B
STAFF RECOMMENDATION:
Staff recommends that the City Council conduct a public hearing, consider the information contained in the staff report, testimony of the public, recommendations by the Planning Commission on specific components of the project, and take the following actions:
1 .
Determine the Addendum to the certified Environmental Impact Report (EIR) for (State Clearinghouse No 2015032102) the Special Use District B Northeast Quadrant (SUD B NEQ) Specific Plan as the appropriate level of documentation to satisfy the requirements of the California Environmental Quality Act (CEQA) based on a determination that no new or substantially more severe impacts would result from the project, and the prior analysis contained in the original certified SUD-B NEQ EIR adequately addresses environmental impacts and subject to the applicable mitigation measures of the adopted SUD-B NEQ Specific Plan Mitigation Monitoring Reporting Program (Attachment 1 and Exhibits).
2 .
Waive first reading and introduce by title only an Ordinance to approve a Zone Text Amendment to the adopted SUD-B NEQ General Development Plan (City Council Resolution No. 2019-099) amending the zoning category for “Automobile service stations, Smog Centers, not including major repair or overhaul” from Prohibited Use to Allowed with approval of a Conditional Use Permit (Attachment 2 and Exhibits). 3 .
Adopt a Resolution accepting the recommendation from the Planning Commission to approve the amendment to the commercial portion of the original approved A&P Lincoln, LLC (Peery-Arrillaga) Property Large Lot Tentative Parcel Map (City Council Resolution No. 2019-104) in connection with the proposed West Lincoln Square Commercial Tentative Parcel Map. The tentative (commercial) parcel map would subdivide the 40- acre parcel into a total of 22 commercial and ancillary parcels (Attachment 3 and Exhibits).
BACKGROUND/INTRODUCTION:
The 40-acre project site (Assessor’s Parcel Number 021-262-044) is zoned Commercial and designated as Community Commercial and identified as Parcel 2 in the SUD B NEQ Specific Plan area, which was approved by the City Council on May 14, 2019. The adoption of the
STAFF REPORT
315
specific plan included a certification of an Environmental Impact Report (EIR) (State Clearinghouse #2015032102) certifying the environmental analysis and conclusion of the specific plan’s conformance with the California Environmental Quality Act (CEQA) and approval of the General Development Plan (GDP) as the “zoning regulation” for the specific plan. The specific plan contains a mix of uses including residential, commercial, and park/open space. Since its conception and approval, development has occurred as prescribed in the specific plan, and under the zoning regulations of the SUD-B NEQ General Development Plan.
The project site is situated at the northeast corner of State Route (SR) 65 and Nelson Lane. It is bordered by both vacant and developing commercial and residential lands to the northwest, northeast and east; and vacant parcels to the south that are currently within the City border (Attachment 4). The project site has a relatively gentle slope topography with ruderal vegetation and is bordered by existing public roads, including Nelson Lane to the west and SR 65 to the south. Oakbrook Drive, located north of the site, would serve as a future collector and provide access to the project site. The project site is disturbed and routinely disked (i.e., disturbed) for vegetation management and production of hay. Currently, the project site is subject to the existing approved A&P Lincoln, LLC (Peery-Arrillaga) Property Large Lot Tentative Parcel Map that divides the site into seven commercial parcels, two landscape parcels, and one open space parcel (Attachment 3 and Exhibits). The SUD B NEQ Specific Plan currently entitles the project site for approximately 475,500 square feet of commercial development.
The project proposes a new commercial center, West Lincoln Square, with a development potential of approximately up to 245,632 square feet. The project would be anchored by an approximate 181,300 square foot major retailer and would include a mix of commercial uses with building sizes ranging from 1,600 to 10,000 square feet and a total lot coverage of 15 percent. Project features would include a major retail store and on-site fuel station, a bank with drive-thru, an oil-change center, a tire center, a second fuel station, six quick-serve restaurants (i.e., drive-thru), multi-tenant shops, a stand-alone restaurant, a carwash, and an electric vehicle charging area. The major retailer would be positioned in the southeastern portion of the site (north of SR 65), with bank, automotive, retail, and dining uses located along Nelson Lane and Oakbrook Drive (Attachment 5).
The required project entitlements include a Zone Text Amendment to the SUD B NEQ General Development Plan, an amendment to the commercial portion of an approved Tentative Parcel Map, Specific Development Plan/Development Permit, and Conditional Use Permits.
Specifically, the Zone Text Amendment proposes to amend the SUD B General Development Plan to allow Automotive Service Stations with approval of a Conditional Use Permit. The amended West Lincoln Square Commercial Tentative Parcel Map proposes to divide the property into fifteen commercial parcels, seven landscape, infrastructure and drainage parcels (Attachment 3 and Exhibits).
Planning Commission Action
The City of Lincoln Planning Commission (PC) conducted a public hearing on the proposed project on Wednesday March 18, 2026
[1]
. No public comments were received on the project
during the hearing. Two written comments were received in advance of the PC hearing. The resident that provided the two written comments noted concerns related to noise, traffic, odor, light pollution, and crime; size of the commercial site and types of proposed uses; the future roundabout planned for Oakbrook Drive. Responses to the resident’s comments were provided as an attachment to the PC Staff Report and summarized within the staff report [2]
.
316
The PC expressed support of the project acknowledging the city’s need for commercial centers in the proposed project area.
The PC recommended approval of the overall project by a 7-0 vote. However, only the General Development Plan Amendment and the Tentative Parcel Map are under the authority of the City Council. The PC recommended approval of the amendment to the commercial portion of the original approved A&P Lincoln, LLC (Peery-Arrillaga) Property Large Lot Tentative Parcel Map as well as the Zone Text Amendment to the adopted SUD-B NEQ General Development Plan.
PROJECT DESCRIPTION
As outlined, only the GDP amendment and commercial Tentative Parcel Map portions of the West Lincoln Square Commercial Development falls within the authority of the City Council.
The Zone Text Amendment to the SUD B General Development Plan involves amending the zoning category for "Automobile service stations, Smog centers, not including major repair or overhaul" from Prohibited Use to Allowed with approval of a Conditional Use Permit. The proposed project includes an oil change facility on Pad 4, located at the northeast corner of the West Lincoln Square site. Under the SUD B General Development Plan, this type of facility is categorized as an Automobile Service Station. With approval of the recommended Zone Text Amendment, the proposed use would be permitted, contingent upon issuance of a Conditional Use Permit. The proposed oil change facility is comparable to similar automotive service uses permitted as conditional uses under municipal code Section 18.22.030 (Conditional Uses) for commercial zoning districts, including the Firestone Autocare at the Sterling Pointe Shopping Center, as well as George's Friendly Auto Services and Lincoln Automotive located in Downtown Lincoln.
The amendment to the commercial portion of the approved A&P Lincoln, LLC (Peery-Arrillaga) Property Large Lot Tentative Parcel Map would amend the original commercial subdivision consisting of seven commercial parcels, two landscape parcels, and one open space parcel to 15 commercial parcels, seven landscape, infrastructure and drainage parcels (Attachment 3 and Exhibits). The right-of-way dedication for Oakbrook Drive, select conditions of approval, and other features of the approved A&P Lincoln, LLC (Peery-Arrillaga) Property Large Lot Tentative Parcel Map would remain in effect. As further described below, the project proposes to include reciprocal ingress, egress, parking and public utility easements across the various parcels.
FINDINGS/ANALYSIS:
As integral components of the West Lincoln Square Commercial Development, the GDP Amendment and Commercial Tentative Parcel Map have been reviewed and verified for consistency with the applicable policies and standards of the City of Lincoln General Plan, SUD-B NEQ Specific Plan and General Development Plan, and LMC Title 17 (Subdivisions).
Justification for consistency with the findings are provided below.
General Plan
The West Lincoln Square Commercial Center implements and is consistent with numerous policies of the City of Lincoln General Plan
[1]
. This is primarily achieved through project
compliance with the adopted SUD B NEQ Specific Plan and General Development Plan.
Below are the applicable policies with supporting rationale for consistency.
Economic Development Element Policy ED-2.1 – Utilize Specific Plans 317
The City shall utilize the specific planning process for future growth areas, which will allow the City to plan for long-term infrastructure needs and create large tracts of land that are attractive to developers.
Rationale:
Consistent. The project is within a commercial designated area of the SUD-B NEQ Specific Plan and conforms with the standards of the General Development Plan, implementing the economic policies of the specific plan.
Economic Development Element Policy ED-2.3 – Business Expansion and Attraction The City shall facilitate zoning and permit activities related to the expansion of existing businesses and the location of new businesses.
Rationale:
Consistent. The project is consistent with the zoning for the site and would obtain the appropriate permits required for development of the site as a new commercial center and businesses.
Economic Development Element Policy ED-4.3 – Attract New Businesses The City shall encourage new businesses to locate in the following areas: downtown Lincoln; along the future Highway 65 Bypass; at the Lincoln Regional Airport; and in the business park surrounding the airport.
Rationale:
Consistent. The project would introduce new commercial businesses located directly north of the SR 65 and south of the Lincoln Regional Airport.
Economic Development Element Policy ED-4.5 – Retail Market The City shall identify a range of retail development sites and opportunities in order to promote a stronger local and regional retail market which meets the needs of the growing Lincoln population and complements the Lincoln downtown.
Rationale:
Consistent. The project is retail in nature and provide a regional shopping center for local residents and visiting patrons as it will provide easy access off of SR 65.
Economic Development Element Policy ED-4.6 – Regional Commercial The City will reserve appropriately zoned property along the State Highway 65 Bypass for future regional commercial land uses such as a regional shopping center, auto mall, or other vehicle sales and services.
Rationale:
Consistent. The project site is zoned for commercial uses and would introduce a new commercial shopping center north of SR 65.
Land Use Element Policy LU-1.12 – Quality Design
Through the design review process, apply design standards that promote the use of high quality building materials, architectural and site designs, landscaping signage and amenities.
The City will continue to develop and apply design standards that result in efficient site and building designs, pedestrian friendly projects that stimulate the use of alternative modes of transportation, and a functional relationship between adjacent developments.
Rationale:
Consistent. The project has been appropriately designed consistent with the commercial architectural design theme guidelines and standards of the SUD-B NEQ Specific Plan and General Development Plan. The proposed designs will incorporate a variety of 318
modern decorative elements, accent colors, and architectural features to establish a cohesive and marketable thematic identity for the retail center.
Land Use Element Policy LU-3.3 - Parking & Transportation and Circulation Element Policy T-3.2 - Adequate Off-Street Parking
LU-3.3: The City shall ensure that adequate parking and access are included in approved commercial development plans. T-3.2: The City shall require the provision of adequate off- street parking in conjunction with new development. Parking shall be located convenient to new development and shall be easily accessible from the street system.
Rationale:
Consistent. The project has been designed with the appropriate amount and type of parking stalls consistent with the standards of the General Development Plan and LMC Title 18 Section 18.44.090 - Shopping Centers. As discussed above, the project would be consistent with the number of required parking stalls.
Transportation and Circulation Element Policy T-2.2 – New Development and Policy T-
2.3 – Level of Service for Local Streets and Intersections and Policy T-2.4 – Level of Service for State Highways
T-2.2: The City shall ensure that streets and highways will be available to serve new development by requiring detailed traffic studies and necessary improvements as a part of all major development proposals.
T-2.3: Strive to maintain a LOS C at all signalized intersections in the City during the p.m. peak hours. Exceptions to this standard may be considered for intersections where the city determines that the required road improvements are not acceptable (i.e., due to factors such as the cost of improvements exceeding benefits achieved, results are contrary to achieving a pedestrian design, or other factors) or that based upon overriding considerations regarding project benefits, an alternative LOS may be accepted. For purposes of this policy, City intersections along McBean Park Drive between East Avenue and G Street, and G Street between First Street and Seventh Street, are excluded from the LOS C standard, and will operate at a lower LOS.
T-2.4: The City shall coordinate with Caltrans in order to strive to maintain a minimum LOS “D” for SR 65 and SR 193.
Rationale:
Consistent. The applicant retained the professional transportation planning services of DKS Associates that identified design options for project access points and lighted intersection access to Oakbrook Drive that would meet the LOS standard in this policy.
Transportation and Circulation Element Policy T-5.9 – Pedestrian Access The City shall encourage specific plans and development plans to include design of pedestrian access that enables residents to walk from their homes to places of work, recreation and shopping.
Rationale:
Consistent. The project would incorporate pathways and internal walkways to enable nearby residential and internal pedestrian access at the site.
Public Facilities & Services Element PFS-1.3 – Conditions of Approval During the development review process, the City shall not approve new development unless the following conditions are met:
The applicant can demonstrate that all necessary infrastructure will be installed or adequately financed;
319
Infrastructure improvements are consistent with City infrastructure plans; and Infrastructure improvements incorporate a range of feasible measures that can be implemented to reduce public safety and/or environmental impacts associated with the construction, operation, or maintenance of any required improvement.
Rationale:
Consistent. The project would include installation of new required infrastructure and interconnect with existing infrastructure in the project area consistent with City regulations.
Public Facilities & Services Element PFS-2.3 – Adequate Water Supply for New Development
The City shall require the availability of an adequate water supply to be demonstrated before approving new development.
Rationale:
Consistent. The project is designed and conditioned to connect to existing water facility connections adjacent to the site.
Public Facilities & Services Element Policy PFS-3.10 – Sewer Lines for New Development
The City shall require new development to be responsible for construction of all sanitary sewer lines serving such development. Provision will be made allowing reimbursement from Third Parties, or credits against City wastewater fees (as approved by the Director of Public Works) should such lines result in an "over-sizing" for a particular development.
Rationale:
Consistent. The project is designed and conditioned to connect to existing sewer facility connections adjacent to the site.
Public Facilities & Services Element Policy PFS-4.1 – Adequate Storm Drainage Facilities, Policy PFS-4.2 – Development Requirements, and Policy PFS-4.7 – Stormwater Runoff
PFS-4.1: The City shall provide storm drainage facilities with sufficient capacity to protect the public and private property from storm water damage. The facilities will also be implemented in a manner that reduces all public safety and/or environmental impacts associated with the construction, operation, or maintenance of any required drainage improvements (i.e., drainage basins, etc.).
PFS-4.2: The City shall encourage project designs that minimize drainage concentrations and impervious coverage and avoid floodplain areas and, where feasible, be designed to provide a natural water course appearance.
Policy-4.7: The City shall require new development to provide stormwater-retention sufficient for the incremental runoff from an eight-day 100 year storm.
Rationale:
Consistent. The project would be designed to connect to existing storm water infrastructure and would include on-site drainage basins for stormwater flows.
Public Facilities & Services Element Policy PFS-5.1 – Solid Waste Collection and Policy PSF-5.2 – Waste Reduction
PSF 5.1: The City shall require solid waste collection services for existing and new developments to ensure the maintenance of health standards.
PSF 5.2: The City shall promote maximum use of solid waste reduction, recycling, and composting of wastes for a reduction in residential, commercial, and industrial waste disposal.
320
Rationale:
Consistent. The project would include onsite solid waste and recycling disposal and collection.
Lincoln Municipal Code Title 17 (Subdivision)
This application is being heard pursuant to Title 17 (Subdivisions) of the LMC regulating Subdivisions and the SUD B NEQ General Development Plan (GDP). The tentative parcel map will subdivide the project site parcel of approximately 40 acres into 22 commercial and ancillary parcels of various sizes ranging from approximately 0.24-acre to 16.33-acres. As proposed, the tentative parcel map complies with LMC Section 17.20 – Parcel Maps and the SUD B NEQ GDP. The proposed parcels anticipate inclusion of existing improvements with access off of Nelson Lane and the future Oakbrook Drive. Connection to existing public utilities (e.g., water, sewer, etc.) would occur off of Nelson Lane, west of the project.
Conditions of approval will include provisions for the property owner to provide necessary access, parking, and maintenance agreements in addition to design details of project loading docks, plazas, screenings, and basin appearances to the satisfaction of the City. The Planning Commission recommends City Council take action to adopt a resolution approving the West Lincoln Square Commercial Center Tentative Parcel Map. Standard and project-specific map conditions have been recommended for the project requiring the above-mentioned agreements to the satisfaction of the City Attorney, City Engineer, and the Community Development Director, via the Final Map. Standard and project-specific map conditions have been recommended for the project (Attachment 3 and Exhibits).
ENVIRONMENTAL REVIEW:
The SUD-B Northeast Quadrant Specific Plan Environmental Impact Report Addendum was prepared to address the project’s proposed changes to the SUD-B NEQ Specific Plan and the associated approved A&P Lincoln, LLC (Peery-Arrillaga) Property Large Lot Tentative Parcel Map that was evaluated in the SUD-B NEQ Specific Plan Final EIR (State Clearinghouse No. 2015032102).
The Addendum concluded that the West Lincoln Square Commercial Center Project would not result in new or substantially more severe environmental impacts than those analyzed in the SUD-B NEQ Specific Plan Final EIR. The preparation of a subsequent EIR to the SUD-B NEQ Final EIR is not required pursuant to State CEQA Guidelines Section 15162 (Subsequent EIRs and Negative Declaration). No further environmental review is necessary.
LEVINE ACT COMPLIANCE:
The Levine Act requires a party (or the party’s agent(s)) to a proceeding before the City of Lincoln that involves any action or consideration to their contract, license, permit, or other entitlement for use, to disclose any campaign contribution made to City elected or appointed officer totaling more than $500 within the 12 months before the City decision. The applicant submitted a Levine Act Statement to the City and cited no contributions to a City elected or appointed officer totaling more than $500 within the reporting period.
CONCLUSION:
Supported by the analysis provided above, the West Lincoln Square Commercial Tentative Parcel Map has been found to be consistent with applicable General Plan, SUD-B NEQ Specific Plan and GDP, and LMC standards. Staff has determined that the proposed request is appropriate for the project site and surrounding area, based upon these findings, thus recommending approval of the proposed project subject to the Conditions of Approval. The West Lincoln Square Commercial Center Project was entitled by the Planning Commission 321
during the March 18, 2026 Public Hearing; however, the outstanding entitlements include the amendment to the commercial portion of the original approved A&P Lincoln, LLC (Peery- Arrillaga) Property Large Lot Tentative Parcel Map and an ordinance to approve a Zone Text Amendment to the adopted SUD-B NEQ General Development Plan. The City Council has review authority for all Tentative Parcel Map applications.
ALTERNATIVES:
The City Council, upon deliberation and testimony from the public, can approve the project as presented, or deny the project.
FISCAL IMPACT:
There is no anticipated fiscal impact. All costs associated with the application are assumed by the project applicant and recovered by the City.
REPORT ACCOUNTABILITY:
This Staff Report has been reviewed by the City Attorney for legal sufficiency and by the City Manager for content.
The Finance Department has reviewed this staff report and certifies budgeted funds are available, unless a budget amendment is being requested as part of this action item.
ATTACHMENTS:
Attach 1 - CEQA Reso.doc
Attach_1_Exhibit A.pdf
Attach_2_-_GDP_Ordinance.doc
Attach_2_Exhibit A.pdf
Attach 3 - TPM Reso.doc
Attach_3_Exhibit A B and C.pdf
Attachment 4 - Site Location.pdf
Attachment 5 - Site Plan.pdf
322
Resolution No. 2026-XXX
RESOLUTION 2026-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINCOLN DETERMINING
THE ADDENDUM TO THE SPECIAL USE DISTRICT B NORTHEAST QUADRANT SPECIFIC
PLAN ENVIRONMENTAL IMPACT REPORT (SUD-B NEQ) (EIR) (STATE CLEARINGHOUSE #2015032102) PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
AS THE APPROPRIATE DOCUMENTATION TO SATISFY THE REQUIREMENTS OF CEQA
BASED ON A DETERMINATION THAT NO NEW OR SUBSTANTIALLY MORE SEVERE
IMPACTS WOULD RESULT FROM THE WEST LINCOLN SQUARE COMMERCIAL CENTER,
AND THE PRIOR ANALYSIS CONTAINED IN THE ORIGINAL CERTIFIED SUD-B NEQ EIR
ADEQUATELY ADDRESSES ENVIRONMENTAL IMPACTS AND SUBJECT TO THE
APPLICABLE MITIGATION MEASURES OF THE ADOPTED SUD-B NEQ SPECIFIC PLAN MITIGATION MONITORING REPORTING PROGRAM. APN: 021-262-044-000 (PLN25-00026) APPLICANT/OWNER: LINCOLN 100, LLC
WHEREAS, the City of Lincoln received an application for the West Lincoln Square Commercial Center Project, which includes: (1) an amendment to a portion of the original approved A&P Lincoln, LLC ( Peery-Arrillaga) Property Large Lot Tentative Parcel Map (City Council Resolution No. 2019 -104) for the subdivision (West Lincoln Square Commercial Tentative Parcel Map) of the 40-acre parcel into a total of 2 2 commercial and ancillary parcels; (2) a Zone Text Amendment to the adopted Special Use District-B Northeast Quadrant (SUD-B NEQ) General Development Plan (GDP) (City Council Resolution No. 2019 -099) amending the zoning category for “Automobile service stations, Smog Centers, not including major repair or overhaul” from Prohibited use to Conditional Use; (3) a Specific Development Plan/Development Permit (Design Review) for the proposed Project in conformance with the design and development standards of the SUD-B NEQ Specific Plan and General Development Plan; (4) Conditional Use Permits for alcohol sales and/or consumption, automobile drive - throughs for Quick Serve Restaurants , convenience store car washes, an, a fuel station with extended hours, and automobile service station (oil change facility); and WHEREAS, the Project proposes the construction and operation of a new commercial center on 40 acres of land with a total commercial development potential of approximately 245,632 square feet across 15 individual buildings of various sizes on separate par cels, and associated onsite improvements; and
WHEREAS, the SUD-B NEQ Specific Plan was approved by the City Council on May 14, 201 9 that included certification of the SUD -B NEQ Final EIR ( State Clearinghouse No. 2015032102) the environmental analysis and determination for the implementation of the specific plan; and
WHEREAS, on May 14, 20219 City Council approved A&P Lincoln, LLC (Perry-Arrillaga) Property Large Lot Tentative Subdivision Map (City Council Resolution No. 2019-104); and
WHEREAS, the City Council of the City of Lincoln find that while the proposed Project would modify a portion of the previous approvals associated with the SUD-B NEQ Specific Plan and the associated A&P Lincoln, LLC (Perry-Arrillaga) Property Large Lot Tentative Parcel Map, preparation of a subsequent EIR to the SUD-B NEQ Final EIR is not required pursuant to State 323
Resolution No. 2026-XXX
CEQA Guidelines Section 15162 (Subsequent EIRs and Negative Declaration) based on substantial evidence presented in the SUD -B Northeast Quadrant Specific Plan Enviro nmental Impact Report Addendum consistent with State CEQA Guidelines Section 5164 (Addendum to an EIR or Negative Declaration) (Exhibit A). The proposed Project is subject to the applicable mitigation measures of the adopted Mitigation Monitoring Reporting Program; and
WHEREAS, the City of Lincoln duly noticed and conducted a public hearing before the Planning Commission on March 18, 2026, to consider the proposed Project and the associated CEQA review, after which the Commission recommended approval to the City Council.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lincoln , hereby makes the following determination:
The SUD-B Northeast Quadrant Specific Plan Environmental Impact Report Addendum (Exhibit A) provides substantial evidence that the West Lincoln Square Commercial Center Project would not result in not result in new or substantially more severe environmental impacts than those analyzed in the SUD-B NEQ Final EIR and require the preparation of a subsequent EIR to the SUD-B NEQ Final EIR is not required pursuant to State CEQA Guidelines Section 15162 (Subsequent EIRs and Negative Declaration). No further environmental review is necessary.
In summary, the analysis conducted to determine if further environmental review wou ld be necessary has resulted in the determination that the proposed Project does not result in any environmental impacts beyond those that were previously identified and no further environmental review is necessary.
PASSED AND ADOPTED this 28th day of April, 2026 by the following roll call vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
___________________________
Richard Pearl, Mayor
ATTEST:
Hope Ithurburn, City Clerk
324
EXHIBIT A
Addendum to the SUD-B Northeast
Quadrant Specific Plan EIR
325
Addendum to the
SUD-B Northeast Quadrant Specific Plan EIR
Prepared for:
City of Lincoln
600 Sixth Street
Lincoln, CA 95648
March 2026
326
Addendum to the
SUD-B Northeast Quadrant Specific Plan EIR
Prepared for:
City of Lincoln
600 Sixth Street
Lincoln, CA 95648
Contact:
Thomas Cruickshank
Associate Planner
916.434.2464
Prepared by:
Ascent
455 Capitol Mall, Suite 300
Sacramento, CA 95814
Contact:
Pat Angell
Principal916.732.3324
March 2026
20220041.01
327
Addendum
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum i
TABLE OF CONTENTS
Section Page
LIST OF ABBREVIATIONS ................................ ................................ ................................ ................................ ................................ .......... III 1 INTRODUCTION ................................ ................................ ................................ ................................ ................................ ........ 1-1
1.1 Background and Action Triggering the Addendum ...............................................................................................1-1
1.2 CEQA Guidelines Regarding the Addendum to the EIR .......................................................................................1-1 2 PROJECT DESCRIPTION ................................ ................................ ................................ ................................ ........................... 2-1
2.1 Introduction and Background ....................................................................................................................................... 2-1
2.2 Project Characteristics ...................................................................................................................................................... 2-1 3 ENVIRONMENTAL ANALYSIS ................................ ................................ ................................ ................................ ................ 3-1
3.1 Aesthetics ............................................................................................................................................................................. 3-1
3.2 Agriculture and Forestry Resources ............................................................................................................................ 3-1
3.3 Air Quality ........................................................................................................................................................................... 3-2
3.4 Biological Resources ........................................................................................................................................................ 3-3
3.5 Cultural Resources ........................................................................................................................................................... 3-4
3.6 Energy................................................................................................................................................................................... 3-4
3.7 Geology and Soils ............................................................................................................................................................ 3-4
3.8 Greenhouse Gas Emissions ........................................................................................................................................... 3-5
3.9 Hazards and Hazardous Materials ............................................................................................................................. 3-5
3.10 Hydrology and Water Quality ...................................................................................................................................... 3-6
3.11 Land Use and Planning ................................................................................................................................................... 3-6
3.12 Mineral Resources ............................................................................................................................................................ 3-7
3.13 Noise ..................................................................................................................................................................................... 3-7
3.14 Population and Housing ................................................................................................................................................ 3-8
3.15 Public Services ................................................................................................................................................................... 3-8
3.16 Recreation ........................................................................................................................................................................... 3-8
3.17 Transportation ................................................................................................................................................................... 3-8
3.18 Tribal Cultural Resources ............................................................................................................................................... 3-9
3.19 Utilities and Service Systems ...................................................................................................................................... 3-10
3.20 Wildfire ............................................................................................................................................................................... 3-10
3.21 Cumulative Impacts ....................................................................................................................................................... 3-10 4 CONCLUSION ................................ ................................ ................................ ................................ ................................ ........... 4-1 5 REFERENCES ................................ ................................ ................................ ................................ ................................ ............... 5-1 6 LIST OF PREPARERS ................................ ................................ ................................ ................................ ................................ ..6-1
328
Table of Contents Addendum Ascent
City of Lincoln
ii SUD-B Northeast Quadrant Specific Plan EIR Addendum
Figures
Figure 2-1 Land Use Plan .................................................................................................................................................................... 2-3 Figure 2-2 Project Vicinity ................................................................................................................................................................... 2-5 Figure 2-3 Project Location ................................................................................................................................................................ 2-6 Figure 2-4 West Lincoln Square Conceptual Site Plan .............................................................................................................. 2-7 Figure 2-5 Amended Tentative Parcel Map .................................................................................................................................. 2-9 Figure 2-6 Conceptual Architectural Perspectives.................................................................................................................... 2-13 Figure 2-7 Conceptual Architectural Elevations – North & East .......................................................................................... 2-15 Figure 2-8 Conceptual Architectural Renderings – Southeast & Northeast .....................................................................2-17 Figure 2-9 Conceptual Architectural Renderings – Northeast & Northwest ................................................................... 2-19 Figure 2-10 Conceptual Architectural Elevations – North & East .......................................................................................... 2-21 Figure 2-11 Major Anchor Presentation Elevations .................................................................................................................... 2-23 Figure 2-12 Major Anchor Elevations .............................................................................................................................................. 2-25
329
Ascent Addendum Abbreviations
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum iii
LIST OF ABBREVIATIONS
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
DOC California Department of Conservation
EIR Environmental Impact Report
EV electric vehicle
GHG greenhouse gas
HCP habitat conservation plan
LID low-impact development
LMC Lincoln Municipal Code
LOS level of service
MMRP Mitigation Monitoring and Reporting Program
NAHC Native American Heritage Commission
OPR California Office of Planning and Research
PCAPCD Placer County Air Pollution Control District
PCCP Placer County Conservation Program
PFG Potential Future Growth
PRC Public Resources Code
proposed project West Lincoln Square Project
QSR Quick Service Restaurants
SB Senate Bill
SEIR subsequent EIR
sf square foot
Specific Plan EIR EIR for the SUD B NEQ Specific Plan
SUD-B NEQ Special Use District B Northeast Quadrant
VMT vehicle miles traveled
330
Table of Contents Addendum Ascent
City of Lincoln
iv SUD-B Northeast Quadrant Specific Plan EIR Addendum
This page is intentionally left blank.
331
Addendum
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 1-1 1 INTRODUCTION
1.1 BACKGROUND AND ACTION TRIGGERING THE ADDENDUM
The City of Lincoln previously prepared the Special Use District B Northeast Quadrant Specific Plan Environmental Impact Report (SUD-B NEQ) (EIR) (Specific Plan EIR), which programmatically evaluated the environmental impacts of implementing SUD-B NEQ Specific Plan. The SUD-B NEQ Specific Plan was approved by the City on May 14, 2019; the programmatic environmental impacts of the Specific Plan were evaluated in the SUD-B NEQ EIR, which was also certified on May 14, 2019.
In September 2025, the project applicant filed a development application for a Commercial Design Review, a Conditional Use Permit, Tentative Parcel Map, a Zone Text Amendment, and a Specific Development Plan/Development Permit (Design Review) for the proposed West Lincoln Square Project (proposed project). The proposed project is located within the southwest portion of the SUD-B NEQ Specific Plan and was considered as part of implementation of the plan in the Specific Plan EIR. Based on review of those deta ils and in accordance with Section 15164 of the State California Environmental Quality Act (CEQA) Guidelines, the City has prepared this Addendum that documents how the project as currently proposed would not result in any new or substantially more severe environmental impacts compared to those evaluated in the Specific Plan EIR.
1.2 CEQA GUIDELINES REGARDING THE ADDENDUM TO THE EIR
If, after certification of an EIR, altered conditions, changes, or additions to a project occur, CEQA requires no additional actions unless additional discretionary approval is required. If additional discretionary approval is required, CEQA provides three mechanisms to address these changes: a subsequent EIR (SEIR), a supplement to an EIR, and an addendum to an EIR.
Public Resources Code (PRC) Section 21166 and sections 15162-15163 of the State CEQA Guidelines describe the conditions under which an SEIR would be prepared. In summary, when an EIR has been certified for a project, no SEIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in light of the whole record, one or more of the following:
substantial changes are proposed in the project that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
substantial changes occur with respect to the circumstances under which the project is undertaken that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete was adopted, shows any of the following:
the project will have one or more significant effects not discussed in the previous EIR; significant effects previously examined will be substantially more severe than shown in the previous EIR; mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
mitigation measures or alternatives that are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. 332
Introduction Addendum Ascent
City of Lincoln
1-2 SUD-B Northeast Quadrant Specific Plan EIR Addendum State CEQA Guidelines Section 15164 provides that a lead agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary, but none of the conditions described above for Section 15162 calling for preparation of an SEIR have occurred. In evaluating whether a SEIR is needed under 21166 and 15162, the agency considers only the incremental difference between the original project and the project as modified (See Benton v.
Board of Supervisors (1991) 226 Cal. App. 3d 1467; Temecula Band of Luiseño Mission Indians v. Rancho California Water Dist. (1996) 43 Cal. App. 4th 425.)
333
Addendum
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-1 2 PROJECT DESCRIPTION
2.1 INTRODUCTION AND BACKGROUND
This document serves as an addendum to the EIR for the SUD B NEQ Specific Plan (Specific Plan EIR) (State Clearinghouse No. 2015032102). The Specific Plan and EIR contemplated 69.8 acres of commercial, 84.3 acres of low density residential (429 units), 4.6 acres of park, 22.8 acres of open space, 4.6 acres of new roadways/right -of-way land uses. Figure 2-1 provides an overview of the entire Specific Plan planning area, with the proposed project site outlined.
Since the time that the Specific Plan EIR was adopted, the City and the project applicant have engaged in the design of the approximate 40-acre, multi-use commercial shopping center and have determined the final details of the project and associated amendments to SUD B NEQ Specific Plan approvals involving this site. This includes a Zone Text Amendment to the adopted SUD-B General Development Plan (City Council Resolution No. 2019-099) and an amendment to the commercial portion of the original approved Peery/Arrillaga Large Lot Tentative Subdivision Map Large Lot (City Council Resolution No. 2019-104) and Small-Lot Subdivision (City Council Resolution No. 2019-105).
This addendum describes the project-specific details of the proposed multi-use commercial shopping center, referred to as West Lincoln Square, and compares the environmental impacts that would occur under the current proposal to those that were previously identified in the Specific Plan EIR.
2.1.1 Project Location and Surrounding Land Uses
The project site consists of an approximately 40-acre vacant lot at the southwest corner of Highway 65 and Nelson Lane (Assessor’s Parcel Number 021-262-044), located within the City of Lincoln, in Placer County (see Figure 2-2 and 2-3). The site is characterized as an undeveloped, flat parcel, that is regularly disked for vegetation treatment and used for the annual production of hay. The proposed project is identified as Parcel 2 in the SUD B NEQ Specific Plan EIR. Surrounding land uses include commercial development to the northwest; residential development to the northeast and east (residential development to the east was contemplated as part of the SUD-B NEQ Specific Plan); and a few vacant parcels directly north, west, and south of the project site. The Lincoln Regional Airport is located approximately one mile northwest of the project site.
The project site is zoned Commercial and designated as Community Commercial by the City of Lincoln (City of Lincoln 2025). The site is designated as commercial in the SUD B NEQ Specific Plan and is subject to the commercial development standards of the SUD-B General Development Plan (Frayji Design Group 2019). Currently, the project site has an approved Large and Small Lot Tentative Subdivision Map that divides the site into seven commercial parcels, two landscape parcels, and one open space parcel. The SUD B NEQ Specific Plan currently entitles the project site with approximately 475,500 square feet of commercial development.
2.2 PROJECT CHARACTERISTICS
The proposed project would include development of a new commercial center on 40 acres of land with a total commercial development potential of approximately 245,632 square feet. The site would be anchored by an approximate 181,300 square foot (sf) major retailer, and would include a mix of commercial, automotive, and restaurant uses. Project features would include a major retail store and on-site fuel station, a bank, an oil-change center, a tire center, a second fuel station, six quick-serve restaurants (i.e., drive-thru), multi-tenant shops, a stand- alone restaurant, a carwash, and an electric vehicle (EV) charging area (see Figure 2-4). As shown in Figure 2-4, the major retailer would be positioned in the southwestern portion of the site (north of Highway 65), with a bank, automotive, retail, and dining uses located along Nelson Lane and Oakbrook Drive. 334
Project Description Addendum Ascent
City of Lincoln
2-2 SUD-B Northeast Quadrant Specific Plan EIR Addendum
MODIFICATIONS TO PREVIOUS APPROVALS
In order to allow for the development of the proposed oil change use, the project proposes a Zone Text Amendment to the adopted SUD-B General Development Plan (Table 2.1 Permitted Uses) amending the zoning category for “Automobile service stations, Smog Centers, not including major repair or overhaul” from Prohibited use to Conditional Use. The project would also amend a portion of the original approved Peery/Arrillaga Large Lot Tentative Subdivision Map Large Lot (City Council Resolution No. 2019-104) and Small-Lot Subdivision (City Council Resolution No. 2019-105). The amended commercial tentative parcel map would subdivide the site into a total of 2 2 commercial and ancillary parcels (Figure 2-5).
335
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-3
Source: Image produced and provided by Frayji Design Group, Inc. in 2019; adapted by Ascent in 2026 Figure 2-1 Land Use Plan
Project Site
336
337
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-5
Source: Adapted by Ascent in 2025.
Figure 2-2 Project Vicinity
338
Project Description Addendum Ascent
City of Lincoln
2-6 SUD-B Northeast Quadrant Specific Plan EIR Addendum
Source: Adapted by Ascent in 2025.
Figure 2-3 Project Location
339
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-7
Source: Image produced and provided by Morton & Pitalo, inc. in 2025; adapted by Ascent in 2025.
Figure 2-4 West Lincoln Square Conceptual Site Plan
340
341
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-9
Source: Image produced and provided by Morton & Pitalo, inc. in 2025; adapted by Ascent in 2025.
Figure 2-5 Amended Tentative Parcel Map
342
343
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-11
PROJECT DESIGN, UTILITIES, AND LANDSCAPING
Proposed onsite buildings would be designed consistent with the adopted SUD-B General Development Plan and would include single-story structures with design features such as parapets and towers. Buildings would incorporate neutral colors and natural elements (e.g. stone) (Figures 2-6 through 2-12).
Landscaping would be incorporated throughout the project site and would include tree plantings, shrubs, and groundcover. Drainage basins would be constructed along Oakbrook Drive, Nelson Lane, and along the southern border of the site, north of Highway 65. Public gathering and seating areas would also be constructed within the site for retail users. As described above, pedestrian pathways would be constructed to connect commercial uses within the site as well as neighboring residential uses to the east.
The project would connect to and be served by existing utility infrastructure (e.g., sewer, gas, water, electricity) within Nelson Lane. Internal utility infrastructure extending existing pipelines for proposed site uses would be constructed within the site.
2.2.1 Access and Circulation
The project site is currently accessible from Highway 65 and Nelson Lane. The project would include one entrance along Nelson Lane to the west and three entrances along a newly constructed roadway, Oakbrook Drive, to the north. A new roundabout is planned for construction along Oakbrook Drive (that is not part of the proposed project), northeast of the site, and would include future access to the project site. Internal roadways, sidewalks, and pedestrian pathways would be incorporated within the site; pedestrian pathways would connect to neighboring residential uses.
The project would include approximately 1,200 parking spaces, consisting of 46 ADA accessible spaces, 215 EV capable spaces, and 47 EV charging stations spaces. Consistent with the Specific Plan and City standards, bicycle parking would be provided and would include 35 bicycle parking spaces for employees and retail visitors.
2.2.2 Construction Activities
Construction of the project is anticipated to begin in Summer 2026. Construction staging would occur onsite and access for emergency response would be maintained at all times. Consistent with the Specific Plan EIR Mitigation Measure NOI-4, construction activities would occur Monday through Friday between 7:00 am and 7:00 pm. The proposed project would be designed in a manner consistent with the City’s Design Guidelines with respect to architectural design/features, building form, and colors in order to main tain a consistent aesthetic along the City’s western boundary.
2.2.3 Project Approvals
The proposed project consists of the following entitlement requests:
A Zone Text Amendment to the adopted SUD-B General Development Plan (City Council Resolution No. 2019- 099) amending the zoning category for “Automobile service stations, Smog Centers, not including major repair or overhaul” from Prohibited use to Conditional Use;
An amendment to the commercial portion of the original approved Peery/Arrillaga Large Lot Tentative Subdivision Map Large Lot (City Council Resolution No. 2019-104) and Small-Lot Subdivision (City Council Resolution No. 2019-105). The amended commercial tentative parcel map would subdivide the 40 -acre parcel into a total of 22 commercial and ancillary parcels;
A Specific Development Plan/Development Permit (Design Review) for the proposed West Lincoln Square Commercial Development in conformance with the design and development standards of the SUD -B NEQ Specific Plan and General Development Plan;
344
Project Description Addendum Ascent
City of Lincoln
2-12 SUD-B Northeast Quadrant Specific Plan EIR Addendum The project includes Conditional Use Permits for the following proposed uses:
Alcohol sales and/or consumption consistent with Lincoln Municipal Code (LMC) Section 18.22.030(21) ; Automobile Drive-Through consistent with LMC 18.22.030(26) for Pad 11 (Major Anchor), Pad 3 (Bank), Pad 5 (Car Wash), proposed Quick Service Restaurants (QSR) at Pads 7 through 9, Pad 10, and QSRs at Pads 12 through 14 . Fuel Station service stations with extended hours consistent with SUD-B NEQ GDP for the proposed fuel stations at Pad 2 and Pad 11; and
Automobile service stations consistent with SUD-B NEQ GDP for the proposed Oil Change Station and associated drive-through at Pad 4.
1 Pad numbering is the same as the proposed parcel numbering identified in the West Lincoln Square Commercial Tentative Parcel Map. 345
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-13
Source: Image produced and provided by VMI Architecture, inc. in 2025; adapted by Ascent in 2025.
Figure 2-6 Conceptual Architectural Perspectives
346
347
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-15
Source: Image produced and provided by VMI Architecture, inc. in 2025; adapted by Ascent in 2025.
Figure 2-7 Conceptual Architectural Elevations – North & East 348
349
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-17
Source: Image produced and provided by VMI Architecture, inc. in 2025; adapted by Ascent in 2025.
Figure 2-8 Conceptual Architectural Renderings – Southeast & Northeast 350
351
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-19
Source: Image produced and provided by VMI Architecture, inc. in 2025; adapted by Ascent in 2025.
Figure 2-9 Conceptual Architectural Renderings – Northeast & Northwest 352
353
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-21
Source: Image produced and provided by VMI Architecture, inc. in 2025; adapted by Ascent in 2025.
Figure 2-10 Conceptual Architectural Elevations – North & East 354
355
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-23
Source: Image produced and provided by brr in 2025; adapted by Ascent in 2026.
Figure 2-11 Major Anchor Presentation Elevations
356
357
Ascent Addendum Project Description
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 2-25
Source: Image produced and provided by brr in 2025; adapted by Ascent in 2026.
Figure 2-12 Major Anchor Elevations
358
359
Addendum
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 3-1 3 ENVIRONMENTAL ANALYSIS
As described above, the project applicant filed an application associated with development of a proposed commercial center within the SUD-B NEQ Specific Plan area. As referenced above, the Specific Plan EIR contemplated development of 69.8 acres of commercial uses, 84.3 acres of low density residential, 4.6 acres of parks/recreation uses, 22.8 acres of open space, and 4.6 acres of right of way. Commercial uses were considered at the corner of Highway 65 and Nelson Lane (i.e., the location of the proposed project), and along Nelson Lane towards Nicolaus Road.
As described in Section 2.2, “Project Characteristics,” the proposed project would result in construction and operation of approximately 40 acres of commercial uses at the southwest corner of Highway 65 and Nelson Lane within the Specific Plan area. Of the 69.7 acres of commercial development approved with the Specific Plan EIR, approximately 475,500 square feet of commercial development is currently allowed on the project site. The project, as currently proposed, includes approximately 245,632 square feet of commercial development, including various types of commercial uses. The project would result in a 229,868 square feet reduction in commercial development potential than was allowed under the SUD-B NEQ Specific Plan. This project also includes amendments to SUD B NEQ Specific Plan approvals involving a Zone Text Amendment to the adopted SUD-B General Development Plan and an amendment to the commercial portion of the original approved Peery/Arrillaga Large Lot Tentative Subdivision Map Large Lot and Small-Lot Subdivision.
This addendum evaluates the potential effects for the project to result in new of substantially more severe environmental impacts compared to those disclosed in the certified Specific Plan EIR. The project would implement all applicable adopted mitigation measures identified in the Specific Plan EIR. A Mitigation Monitoring and Reporting Program (MMRP) has been prepared for the project and attached to this addendum ( Exhibit B).
3.1 AESTHETICS
The Specific Plan EIR evaluated potential aesthetic, light, and glare impacts in Section 4.1, “Aesthetics.” The EIR concluded that no impacts related to scenic vistas or scenic resources within a state scenic highway would occur.
Impacts related to visual character and quality were determined to be less than significant. Impacts related to light and glare were determined to be potentially significant because buildout of the Specific Plan could result in new reflective features and/or light sources that may be incompatible with the Placer County Airport Land Use Compatibility Plan. Implementation of Mitigation Measure MM-AES-1 was determined to reduce potentially significant light and glare impacts to a less-than-significant level by requiring avoidance of mirrored or highly reflective building materials, excessive upward lighting, laser lighting, and distracting lighting.
No aesthetic resource conditions have changed since certification of the Specific Plan EIR. The proposed project consists of the same extent of commercial development evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint, nor change the intensity of construction activities or development contemplated for the project site. Lighting plans identified for the project indicate that light illumination would be limited within the project site (i.e., would not extend towards sensitive users, such as nearby residents). Further, construction and operation of the project would comply with design standards provided in the SUD-B General Development Plan, which incorporates requirements of adopted Mitigation Measure MM-AES-1 to ensure no adverse impacts related to light and glare occur.
Therefore, the project would not result in any new or substantially more severe impacts to aesthetics than those analyzed in the Specific Plan EIR and no new aesthetics mitigation would be required.
3.2 AGRICULTURE AND FORESTRY RESOURCES
The Specific Plan EIR evaluated potential impacts to agriculture and forestry resources in Section 4.2, “Agriculture and Forestry Resources.” Impacts related to Williamson act contracted lands and effects to Farmland outside of the 360
Environmental Analysis Addendum Ascent
City of Lincoln
3-2 SUD-B Northeast Quadrant Specific Plan EIR Addendum Specific Plan area were determined to be less than significant The Specific Plan EIR concluded that impacts to Prime Farmland, Unique Farmland, and Farmland of Statewide Importance would be significant and unavoidable since the project would result in conversion of designated Farmland to urban uses. Implementation of Mitigation Measure MM-AG-1 was included to require the applicant to obtain and conserve Farmland at a 1:1 ratio for any lost Farmland resulting from the project. However, because Farmland would still be lost within the region as a result of project buildout, this impact was determined to be significant and unavoidable.
No agricultural or forestry resource conditions have changed since certification of the Specific Plan EIR. According to the California Department of Conservation (DOC), the project is designated as Farmland of Local Importance (DOC 2025). As stated above, the project site is zoned as Commercial and designated as Community Commercial by the City of Lincoln. Therefore, the project would not result in any impacts to Prime Farmland, Unique Farmland, and Farmland of Statewide Importance. No areas within the Specific Plan, including the project site, are designated under a Williamson Act contract. Additionally, the proposed project is not located on land zoned for forest land or timberland production and no forest land is present on site. Therefore, the proposed project would not result in new or substantially more severe impacts to agriculture and forestry resources than those analyzed in the Specific Plan EIR and no mitigation would be required.
3.3 AIR QUALITY
The Specific Plan EIR evaluated potential air quality impacts in Section 4.3, “Air Quality.” The EIR concluded that impacts relating to the Specific Plan’s potential to conflict with or obstruct implementation of the applicable air quality management plan, expose sensitive receptors to toxic air contaminants, and create or expose a substantial number of people to objectionable odors were determined to be less than significant. The EIR determined that full buildout of the Specific Plan would create operational emissions that would exceed the Placer County Air Pollution Control District’s (PCAPCD) air quality standards. Specifically, construction of the Specific Plan would generate construction-related air pollutant emissions from entrained dust, equipment and vehicle exhaust emissions, asphalt pavement, and architectural coatings. Exhaust from internal combustion engin es used by construction equipment and vendor trucks (delivery trucks) and worker vehicles would result in emissions of ROG, NO x, and PM10. It was determined that daily unmitigated construction and operation emissions would exceed the PCAPCD thresholds for ROG, NOx, and PM10 at full buildout. Implementation of Specific Plan EIR Mitigation Measures MM -AQ-1 through MM-AQ-4 would reduce ROG, NOx, and PM10 emissions to the extent feasible, which would further reduce construction emissions on a daily basis to a level below the PCAPCD significance thresholds. However, mitigated maximum daily operational emissions of ROG, NO
x, and PM10 at full buildout of the Specific Plan would still exceed the PCPAPCD significance thresholds. This impact was determined to be significant and unavoidable.
No conditions related to air quality have changed since certification of the Specific Plan EIR. The proposed project was contemplated as part of the buildout of the Specific Plan and would include development consistent with the proposed uses and level of construction and equipment that was evaluated in the Specific Plan. As previously described, the proposed project would result in a 229,868 square feet reduction in commercial development potential than was allowed under the SUD-B NEQ Specific Plan for the site that would likely reduce operational air pollutant emissions. In addition, delivery trucks on the project site would be subject to the California Air Resources Board’s Airborne Toxic Control Measure that limits idling of trucks to a maximum of 5 minutes in order to reduce diesel particulate emissions (this requirement is also included in adopted Mitigation Measure MM-AQ-3).
Thus, air quality impacts associated with construction and operation of commercial uses would be less than what was considered in the EIR. The proposed project would be required to implement Mitigation Measures MM-AQ-1 through MM-AQ-4 as well as comply with local, State, and federal air quality regulations. Therefore, the proposed project would be consistent with the evaluation presented in the EIR, and would not result in any new or substantially more severe impacts related to air quality than those analyzed in the Specific Plan EIR, and no new mitigation would be required.
361
Ascent Addendum Environmental Analysis
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 3-3
3.4 BIOLOGICAL RESOURCES
The Specific Plan EIR evaluated potential impacts to biological resources in Section 4.4, “Biological Resources.” The EIR concluded that impacts to biological resources, including special-status species and sensitive biological communities, would be potentially significant because buildout of the Specific Plan could result in overall loss of habitat from the conversion of suitable habitat to developed uses, the removal of wetland features and native oak trees, and from the direct disturbance of individual animals within the Specific Plan area during construction activities.
Implementation of adopted Mitigation Measures MM-BIO-1 through MM-BIO-13 were determined to reduce potentially significant impacts to a less-than-significant level by requiring worker awareness training, biological monitoring, protection of wetlands and waters of the US, trees, siting of construction activities, pre-construction surveys, resource avoidance, and design considerations.
Since adoption and certification of the Specific Plan and Specific Plan EIR, two changes have occurred in the regulatory setting for biological resources identified below:
The Placer County Conservation Program (PCCP), which includes a habitat conservation plan (HCP) was adopted and approved by state and federal permitting agencies. Implementation of adopted Mitigation Measures MM - BIO-3 (Wetlands and Waters of the U.S.), MM-BIO-7 (Vernal Pool Crustacean Avoidance and Mitigation), and MM-BIO-11 (Swainson’s Hawk Foraging Habitat Mitigation) are implemented through payment of PCCP Mitigation Fees.
Crotch’s bumble bee (Bombus crotchii) is now a candidate for listing under the California Endangered Species Act [CESA]). Crotch’s bumble bee was designated as a candidate for listing as endangered under CESA by the California Fish and Game Commission on May 31, 2022. In June of 2023, California Department of Fish and Wildlife (CDFW) released Survey Considerations for CESA Candidate Bumble Bee Species, which included survey and mitigation guidance for the species, as well as an updated current range map for the species. Bumble bees have three basic habitat requirements: suitable nesting sites for colonies, availability of nectar and pollen from floral resources throughout the colony period (spring, summer, and fall), and overwintering sites for the queens.
Crotch’s bumble bees nest underground and likely use, at least in part, old rodent burrows (Williams et al. 2014; Xerces Society 2018). Overwintering likely occurs primarily in woodlands (USFWS 2021). The Specific Plan area, including the project site, contains habitat potentially suitable for Crotch’s bumble bee nesting and foraging. Any ground-disturbing project activities could result in mortality, injury, or disturbance to Crotch’s bumble bees. As described above, the project site is regularly disked (i.e., disturbed) for vegetation management and production of hay annually, which precludes the likelihood of Crotch’s bumble bee to establish habitat within the site.
Therefore, no impacts related to Crotch’s bumble bees would occur through project implementation.
No other biological resource conditions have changed since certification of the Specific Plan EIR. The project site is vacant and is not located within the immediate vicinity of the Markham Ravine, Auburn Ravine, or any ephemeral streams, and is also outside of the 100-year floodplain and is not subject to adopted Mitigation Measures MM-BIO-2, MM-BIO-5, MM-BIO-12, and MM-BIO-13. The proposed project would not impact any trees and is not subject to adopted Mitigation Measures MM-BIO-4, MM-BIO-9, and MM-BIO-10. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint identified for the site, nor change the construction intensity of development contemplated for the project site.
Further, the project would result in less development than what was contemplated in the Specific Plan EIR through buildout of only a portion of the total considered commercial uses. The proposed project would continue to require implementation of applicable adopted mitigation measures to reduce potential biological resource impacts to a less- than-significant level. Therefore, the proposed project would not result in any new or substantially more severe impacts to biological resources than those analyzed in the Specific Plan EIR and no new mitigation would be required.
362
Environmental Analysis Addendum Ascent
City of Lincoln
3-4 SUD-B Northeast Quadrant Specific Plan EIR Addendum
3.5 CULTURAL RESOURCES
The Specific Plan EIR evaluated potential impacts to cultural resources and paleontology in Section 4.5, “Cultural Resources.” Surveys conducted as part of the cultural resources inventory for the Specific Plan EIR did not identify any potentially historic resources on the project site. While no evidence suggests indication of archaeological and paleontological resources or prehistoric- or historic-era marked or unmarked human interments present within the immediate vicinity of the Specific Plan area, the Specific Plan EIR determined that ground-disturbing construction activities could accidentally uncover previously unknown resources and human remains. The Specific Plan EIR concluded that implementation of Mitigation Measures MM-CUL-1 and MM-CUL-2 would preserve inadvertent archaeological and paleontological resources discoveries, as well as human remains, during ground disturbing activities and would reduce impacts to a less-than-significant level.
No cultural resource conditions have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint identified for the site, nor change the intensity of development contemplated for the site. Since the proposed project would involve ground disturbance activities during construction, implementation of adopted Mitigation Measures MM- CUL-1 and MM-CUL-2 would continue to be applicable to the proposed project and would reduce the project’s potential cultural resources impacts to a less-than-significant level. Therefore, the proposed project would not result in any new or substantially more severe impacts related to cultural resources than those analyzed in the Specific Plan EIR and no cultural resources mitigation would be required.
3.6 ENERGY
Impacts related to energy were evaluated in in Section 5.5 of Chapter 5, “CEQA Considerations,” of the Specific Plan EIR. The Specific Plan EIR concluded that construction and long-term operation of the project would not result in wasteful or inefficient use of nonrenewable resources (e.g., electricity, natural gas, and petroleum), and the impact was determined to be less than significant. Furthermore, the Specific Plan EIR determined that no unusual, proposed project characteristics or construction processes requiring the use of equipment that would be more energy intensive than those used for comparable project activities, nor use of equipment that would not conform to current emissions standards, would occur. Additionally, the project would implement design features to minimize its demand for electricity through the use of enhanced building energy efficiency standards, and therefore, would not result in an increase in energy demand that would exceed the available capacity of local and regional energy supplies.
Additionally, policies are in place at the state and federal level to increase fuel efficiency over time. The i ncreasing efficiency of vehicles over the lifetime of the project is also anticipated to result in incremental reductions in the project’s operational fuel use.
No conditions related to energy have changed since certification of the Specific Plan EIR. The proposed project would include commercial development of the approximate 40-acre site, consistent with the proposed uses and level of construction and equipment that was evaluated in the Specific Plan EIR. Hence, construction and operation activities associated with implementation of the proposed project would be consistent with the analysis evaluated in the EIR.
As previously described, the proposed project would result in a 229,868 square feet reduction in commercial development potential than was allowed under the SUD-B NEQ Specific Plan for the site that would likely reduce energy use. Therefore, the proposed project would not result in any new or substantially more severe impacts to energy consumption than those analyzed in the Specific Plan EIR and no energy mitigation would be required.
3.7 GEOLOGY AND SOILS
The Specific Plan EIR evaluated potential impacts to geology and soils in Section 4.6, “Geology and Soils.” The EIR concluded that impacts related to rupture of a known fault, seismic ground shaking, seismic- related ground failure and liquefaction, landslides, soil erosion or loss of topsoil, and unstable geologic units/soils would be less than significant. Additionally, mitigated impacts resulting from expansive soils were determined to be less than significant 363
Ascent Addendum Environmental Analysis
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 3-5 through implementation of Mitigation Measure MM-GEO-1, which would require preparation of a project design- level geotechnical report prior to construction.
No geological or soil conditions have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint, and would involve less commercial development than was originally contemplated for the site . Construction activities would be consistent with those considered in the Specific Plan EIR. The project would include implementation of adopted Mitigation Measure MM-GEO-1. The proposed project would not result in new or substantially more severe impacts to geology and soils than those analyzed in the Specific Plan EIR and no mitigation would be required.
3.8 GREENHOUSE GAS EMISSIONS
The Specific Plan EIR evaluated potential impacts to greenhouse gas (GHG) emissions in Section 4.7, “Greenhouse Gas Emissions.” The EIR concluded that GHG impacts would be potentially significant. Mitigation Measure MM-GHG-1 was included to require implementation of GHG reduction measures, however, buildout of the Specific Plan would result in emissions of 8.9 MT CO2E/SP/year which is more than the efficiency threshold of 4.9 MT CO2E, even after implementation of MM-GHG-1. As a result, the Specific Plan was determined to conflict with Placer County Air Pollution Control District thresholds that are designed to identify projects that may not be consistent with the State’s GHG reduction goals in 2030 and 2050. Therefore, GHG impacts were determined to be significant and unavoidable.
No GHG-related conditions have changed since certification of the Specific Plan EIR. The proposed project was contemplated as part of the buildout of the Specific Plan and would include development consistent with the proposed uses and level of construction and equipment that was evaluated in the Specific Plan EIR. Therefore, construction and operation activities associated with implementation of the proposed project would be consistent with the analysis evaluated in the EIR. As previously described, the proposed project would result in a 229,868 square feet reduction in commercial development potential than was allowed under the SUD -B NEQ Specific Plan for the site that would likely reduce operational GHG emissions. The proposed project would implement the non-residential building requirements of adopted Mitigation Measure MM-GHG-1 as well as comply with local and State GHG regulations. Therefore, the project would not result in any new or substantially more severe impacts related to GHG emissions than those analyzed in the Specific Plan EIR and no new mitigation would be required.
3.9 HAZARDS AND HAZARDOUS MATERIALS
The Specific Plan EIR evaluated potential impacts related to hazards and hazardous materials in Section 4.8, “Hazards and Hazardous Materials.” The EIR concluded that impacts related to the use, transport, and disposal of hazardous materials, creation of hazards through upset or accident conditions, location on hazardous materials sites, impairment of emergency response or evacuation plans, and wildfire risks would be less than significant. Due to the proximity of the Specific Plan area to the Lincoln Regional Airport, the Specific Plan EIR determined that highly reflective building materials or bright lights and bird strikes resulting from buildout of the plan area could represent a hazard to air traffic.
Implementation of Mitigation Measure MM-AES-1 was included to reduce potentially significant light and glare impacts to a less-than-significant level by requiring avoidance of mirrored or highly reflective building materials, excessive upward lighting, laser lighting, and distracting lighting. Additionally, implementation of Mitigation Measure MM-LU-1 was included to reduce the potential for bird strikes through proper design of detention basins in compliance with FAA guidance. Impacts were determined to be less than significant with incorporation of mitigation measures.
No conditions related to hazards or hazardous materials have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint and would involve less commercial development than was originally contemplated for the site. Construction activities would be consistent with those considered in the Specific Plan EIR. Therefore, the same hazards would be present, including the types of hazardous materials that would be used, handled, or transported to the site. No new airports have been developed near the project site, and implementation of the 364
Environmental Analysis Addendum Ascent
City of Lincoln
3-6 SUD-B Northeast Quadrant Specific Plan EIR Addendum proposed project would not conflict with any adopted emergency response or evacuation plans. Further, no changes to wildfire risks have occurred since approval of the Specific Plan EIR. Implementation of adopted Mitigation Measures MM-AES-1 and MM-LU-1 would ensure that safety hazards related to light and glare and impacts to aircraft safety are reduced to a less-than-significant level. The project’s proposed bioretention/detention basins are designed to accommodate 2-, 10-, and 100-year, 24-hour peak storm conditions, but not to retain stormwater that could create a bird attraction based on the West Lincoln Square Preliminary Drainage Report (December 12, 2025). The reader is referred to Section 3.1, “Aesthetics,” for a discussion of project compliance with adopted Mitigation Measure MM- AES-1. Therefore, the proposed project would not result in any new or substantially more severe impacts related to hazards and hazardous materials than those analyzed in the Specific Plan EIR and no new mitigation would be required.
3.10 HYDROLOGY AND WATER QUALITY
The Specific Plan EIR evaluated potential impacts to hydrology and water quality in Section 4. 9, “Hydrology and Water Quality.” The Specific Plan EIR concluded that impacts to water quality, groundwater supplies, runoff and stormwater drainage systems, and flood risk would be less than significant. The Specific Plan EIR, determined that development in the Specific Plan area could result in the alteration of existing drainage which could result in substantial erosion, siltation, or increases in the volume and velocity of stormwater runoff. Mitigation Measure MM- HYD-1 was included to reduce impacts to a less-than-significant level by requiring implementation of low-impact development (LID) designs, and ensuring that water quality and drainage standards (includ ing hydromodification) are met. The Specific Plan EIR also determined that areas within the plan boundaries could constrict areas in which flood flows may pass, resulting in an increase in base flood elevations. This impact related to impedance of flood flows was determined to be potentially significant, however would be reduced to a less- than-significant level through implementation of Mitigation Measure MM-HYD-1 that requires the implementation of drainage and water quality controls.
No conditions related to hydrology or water quality have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint, nor change the type of development contemplated for the project site. The project site is not located within a Special Flood Hazard Area or a 100-year flood zone (FEMA 2025). Upon buildout of the proposed project, adequate surface drainage control would be designed by the project civil engineer in accordance with the latest applicable edition of the California Building Code. Project implementation would also be required to comply with the City of Lincoln’s Storm Water Management Plan and Placer County’s Stormwater Management Manual (including implementation of BMPs). Implementation of adopted Mitigation Measure MM-HYD-1 would reduce potential hydrology and water quality impacts to a less-than-significant level. The project’s proposed bioretention/detention basins are designed to accommodate 2-, 10-, and 100-year, 24-hour peak storm conditions as well as provide water quality to project drainage based on the West Lincoln Square Preliminary Drainage Report (December 12, 2025). Therefore, the proposed project would not result in any new or substantially more severe impacts related to hydrology and water quality than those analyzed in the Specific Plan EIR and no new mitigation would be required.
3.11 LAND USE AND PLANNING
The Specific Plan EIR evaluated potential impacts to land use and planning in Section 4.10, “Land Use and Planning.” The EIR concluded that impacts related to division of an established community would be less than significant; no impacts to conflicts with any applicable habitat conservation plan or natural community plan would occur. Impacts related to conflicts with applicable land use plans, policies, or regulations were determined to be potentially significant due to potential impacts related to highly reflective building materials or bright lights that could represent a hazard to air traffic, and improperly designed detention ponds. The Specific Plan EIR included Mitigation Measure MM-AES-1 which would require commercial development to avoid mirrored or highly reflective building finish materials and excessively bright upward lighting. Mitigation Measure MM-LU-1, was also included and would require all water quality 365
Ascent Addendum Environmental Analysis
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 3-7 detention basins be designed to avoid creating an increased attraction to wildlife and be consistent with FAA rules and regulations. With implementation of mitigation measures, impacts were determined to be less than significant.
Since adoption of the Specific Plan EIR, the Placer County Conservation Program (PCCP) has been approved, which provides programmatic Incidental Take Permits and wetlands permits for certain activities under the FESA and CESA, covering approximately 201,000 acres of Western Placer County, including the City of Lincoln. The project site is within Plan Area A1, Valley Potential Future Growth (PFG) of the PCCP (Placer County 2020, Figure 2-4). The Valley PFG activities are based on designations in the general plans of the County and City of Lincoln (Place r County 2020).
Development of the project would be consistent with the Plan Area designations under the PCCP and would not conflict with PCCP policies. Therefore, the project would not result in conflicts with an HCP or NCCP.
No other conditions related to land use and planning have occurred since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint, nor increase the intensity of development contemplated for the project site. Continued implementation of Mitigation Measures MM-LU-1 and MM-AES-1 would reduce impacts to less-than-significant. The project’s proposed bioretention/detention basins are designed to accommodate 2 -, 10-, and 100-year, 24-hour peak storm conditions, but not to retain stormwater that could create a bird attraction based on the West Lincoln Square Preliminary Drainage Report (December 12, 2025). The reader is referred to Section 3.1, “Aesthetics,” for a discussion of project compliance with adopted Mitigation Measure MM-AES-1. Therefore, the proposed project would not result in any new or substantially more severe impacts related to land use and planning than those analyzed in the Specific Plan EIR and no new mitigation would be required.
3.12 MINERAL RESOURCES
The Specific Plan EIR did not address impacts related to mineral resources as no mineral resources are present within the project area. No conditions have changed since certification of the Specific Plan EIR, and no mineral resources are located within the project site. Therefore, the project would not result in any impacts to mineral resources.
3.13 NOISE
The Specific Plan EIR evaluated potential noise impacts in Section 4.11, “Noise.” The EIR concluded that impact s related to the exposure of excessive noise levels within an airport land use plan as well as excessive groundborne vibration and noise would be less be significant. Impacts related to exposure and generation of noise levels were determined to be potentially significant because buildout of the Specific Plan may exceed applicable standards for sensitive receptors (i.e., residential and recreational uses) due to mobile noise sources from SR -65 and proposed adjacent commercial uses. The Specific Plan EIR included implementation of Mitigation Measures MM-NOI-1, MM- NOI-2, MM-NOI-3, and MM-NOI-4. These mitigation measures require the installation of noise barriers, measures to protect nearby residences from commercial-associated noise, siting requirements for noise-generating uses, and limitations on construction activities near sensitive users (i.e., residences). Implementation of these mitigation measures were determined to reduce potentially significant noise impacts to a less-than-significant level.
No conditions related to noise have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint. Adopted Mitigation Measures MM-NOI-1, MM-NOI-2, and MM-NOI-4 would be applicable to the project and would reduce potential noise impacts. Consistent with these adopted mitigation measures, the project includes an 6-foot to 8-foot noise barrier along the eastern boundary of the site where the proposed commercial project abuts the future SUD B residential neighborhood. Therefore, the project would not result in any new or substantially more severe impacts to noise than those analyzed in the Specific Plan EIR and no new mitigation would be required. 366
Environmental Analysis Addendum Ascent
City of Lincoln
3-8 SUD-B Northeast Quadrant Specific Plan EIR Addendum
3.14 POPULATION AND HOUSING
The Specific Plan EIR evaluated potential population and housing impacts in Section 4.12, “Population and Housing.” The EIR concluded that no impacts related to displacement of housing or people would occur . Impacts related to substantial population growth were determined to be less than significant.
No conditions related to population and housing have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any new housing on the project site, nor remove existing housing. Therefore, the project would not result in any new or substantially more severe impacts to population and housing than those analyzed in the Specific Plan EIR and no mitigation would be required.
3.15 PUBLIC SERVICES
The Specific Plan EIR evaluated potential public service impacts in Section 4.13, “Public Services.” The EIR concluded that impacts related to the provision or need of new or physical altered facilities in order to maintain acceptable service levels including fire, police, schools, and parks, would be less than significant.
No public service conditions have changed since certification of the Specific Plan EIR. The proposed project would be similar to the components evaluated in the Specific Plan EIR. The project would result in less commercial development than was contemplated for the site in the Specific Plan EIR. Further, the project would not result in any changes to the type of development contemplated for the project site, such that additional public service needs (i.e., police and fire protection) would be required. Therefore, the project would not result in any new or substantially more severe impacts to public services than those analyzed in the Specific Plan EIR; no public services mitigation would be required.
3.16 RECREATION
The Specific Plan EIR evaluated potential recreation impacts in Section 4.14, “Recreation.” The Specific Plan EIR concluded that impacts related to increase in the use of existing parks or recreational facilities as well as the expansion of existing recreational facilities, would be less than significant. Though recreational impacts were determined to be less than significant, Mitigation Measure MM-REC-1 was included and requires the project applicant to pay in-lieu fees for the construction of parks and recreational facilities in the project area, consistent with City of Lincon Municipal Code policies, to ensure that the adequate recreational facilities for future residents are available.
The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint, nor increase the intensity of construction or operation contemplated for the project site, such that increased or additional recreational users would be introduced to the project area. Mitigation Measure MM-REC-1 would apply to residential uses implemented under the Specific Plan and therefore does not apply to the proposed project. The project would not result in any new or substantially more severe impacts to recreation than those analyzed in the Specific Plan EIR; no mitigation would be required.
3.17 TRANSPORTATION
The Specific Plan EIR used automobile delay or level of service (LOS) as the primary metric to evaluate the Specific Plan’s CEQA transportation impacts, consistent with industry standards and the City General Plan goals and policies at the time. The Specific Plan EIR evaluated potential traffic and circulation impacts in Section 4.15, “Traffic and Circulation.”
On September 27, 2013, Governor Jerry Brown signed Senate Bill (SB) 743 (Steinberg) into law and started a process to change transportation impact analysis as part of CEQA compliance. SB 743 directed the California Office of Planning and Research (OPR) to revise the CEQA Guidelines to modify the criteria for determining the significance of transportation impacts to promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses. Section 15064.3 of the CEQA Guidelines, adopted in December 367
Ascent Addendum Environmental Analysis
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 3-9 2018, provides that vehicle miles traveled (VMT) is the “most appropriate measure of transportation impacts” and mandates analysis of VMT impacts effective July 1, 2020. LOS, or other measures of automobile delay, are no longer considered significant environmental impacts under CEQA. (Pub. Res. Code, Section 21009(b)(2).) As provided in CEQA Guidelines Section 15007, “amendments to the guidelines apply prospectively only,” and CEQA documents must meet the “content requirements in effect when the document was set out for public review,” and “shall not need to be revised to conform to any new content requirements in guideline amendments taking effect before the document is finally approved.” (CEQA Guidelines, Section 15007(c)).
The Specific Plan EIR circulated for public review before the amendment to the CEQA Guidelines adding VMT as the primary measure of transportation impacts, and used the LOS threshold of significance for traffic impacts. As directed by Section 15007, the Specific Plan EIR does not need to be revised to conform to the new VMT requirements. In addition, the change in law (replacement of the LOS standard with VMT) does not constitute new significant information under CEQA (Public Resources Code [PRC] 21166 or CEQA Guidelines 15162) as it does not constitute a new impact caused by the changes proposed in the project.
The Specific Plan EIR determined that impacts related to transportation hazards, emergency access, air traffic patterns and safety risks, as well as conflicts with public transit, bicycle, or pedestrian -related policies or plans would be less than significant. Impacts related to traffic were determined to be potentially significant. Mitigation Measures MM - TRA-1 through MM-TRA-6 were provided to require the applicant to contribute to traffic signal installation, intersection updates, and roadway/off-ramp updates. With implementation of these measures, direct project impacts were reduced to a less-than-significant level while cumulative impacts remained significant and unavoidable.
A project-specific VMT analysis was prepared for the proposed project, comparing VMT from approved commercial land use conditions under the Specific Plan (475,000 square feet of commercial development) with the proposed project (approximately 245,632 square feet of commercial development) for base year and future year conditions.
Results of the VMT analysis indicated that total regional VMT under base year conditions would not result in increases, which would equate to no CEQA VMT impact. Regional VMT would decrease by less than one tenth of one percent under both baseline and future cases (DKS 2025). The project would include implementation of Mitigation Measures MM-TRA-1 through MM-TRA-6 to ensure potential traffic impacts remain less than significant. Therefore, the project would not result in any new or substantially more severe transportation impacts than those analyzed in the Specific Plan EIR; no new mitigation would be required.
3.18 TRIBAL CULTURAL RESOURCES
The Specific Plan EIR evaluated potential impacts to tribal cultural resources and paleontology in Section 4.5, “Cultural Resources.” A sacred lands search request was sent to the Native American Heritage Commission (NAHC) in December 2014, and did not result in the identification of any tribal cultural resources in the plan area. Furthermore, surveys conducted as part of the cultural resources inventory did not identify any potentially historic resources in the Specific Plan area. In January 2015, tribal contact letters were drafted and mailed to individuals identified on the contact list provided by the NAHC; follow-up phone calls were made to those who received letters. Shingle Springs Rancheria responded that they had no project information regarding cultural resources in the plan area and requested that they be notified if human remains are encountered during project implementation or if any new project information became available. As described in Section 3.5, “Cultural Resources,” above, impacts related to cultural resources were determined to be less than significant through implementation of Mitigation Measures MM - CUL-1 and MM-CUL-2 which would preserve inadvertent archaeological and paleontological resources discoveries, as well as human remains, during ground disturbing activities.
No cultural resource conditions have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint, nor increase the intensity of construction or operation contemplated for the project site. Because the project would involve ground disturbance activities during construction, continued implementation of Mitigation Measures MM-CUL-1 and MM-CUL-2 would ensure that the project’s impact to tribal cultural resources remain less than significant. Therefore, 368
Environmental Analysis Addendum Ascent
City of Lincoln
3-10 SUD-B Northeast Quadrant Specific Plan EIR Addendum the proposed project would not result in any new or substantially more severe impacts related to tribal cultural resources than those analyzed in the Specific Plan EIR and no new mitigation would be required.
3.19 UTILITIES AND SERVICE SYSTEMS
The Specific Plan EIR evaluated potential utility and service system impacts in Section 4.17, “Utilities.” The EIR concluded that impacts related to exceedance of wastewater treatment requirements, construction or expansion of water or wastewater treatment facilities, construction or expansion of storm water drainage facilities, sufficient water supply, adequate wastewater treatment capacity, landfill capacity, and compliance with solid waste statutes and regulations would be less than significant.
No conditions related to utilities and service systems have changed since certification of the Specific Plan EIR. The proposed project is similar to the components evaluated in the Specific Plan EIR; the project would not result in any changes in uses or footprint. As previously described, the proposed project would result in a 229,868 square feet reduction in commercial development potential than was allowed under the SUD -B NEQ Specific Plan for the site that would likely reduce utility service demands. As described above, the project would include connections to existing utility infrastructure to serve buildout of the project site; the project is consistent with utility impacts contemplated in the Specific Plan EIR and would not result in increases in utility services demand. Therefore, the project would not result in any new or substantially more severe impacts related to utilities and service systems than those analyzed in the Specific Plan EIR and no mitigation would be required.
3.20 WILDFIRE
Wildfire was not individually addressed in the Specific Plan EIR. The topic was included in the updated Appendix G of the CEQA Guidelines, which became effective on December 28, 2018. The Specific Plan EIR evaluated potential wildfire impacts in Section 4.8, “Hazards and Hazardous Materials.” The EIR concluded that impacts related to impairment of emergency response or evacuation plans, and wildfire risks would be less than significant because the proposed project would maintain emergency access during construction and the project would be adequately served by CAL FIRE and Lincoln Fire Department.
No wildfire conditions have changed since certification of the Specific Plan EIR. The project site is located within the Local Responsibility Area; the north and west portions of the site are designated for moderate fire hazard severity risk (CAL FIRE 2025). The project site is bounded by undeveloped, agricultural and residential uses. Implementation of the project would include new commercial uses and would not increase or exacerbate wildfire risks in the project area.
Emergency access to and from the site would be maintained during construction activities. Though the project would include installation of utility infrastructure (e.g., utility connections), the project would not require the installation of infrastructure beyond what was anticipated under the Specific Plan EIR (as evaluated in Section 4.17, “Utilities and Service Systems,” of the Specific Plan EIR). As a result, no new significant impacts or substantially more severe impacts than those contemplated in the Specific Plan EIR would occur; no mitigation is required.
3.21 CUMULATIVE IMPACTS
The proposed project would result in construction and operation of commercial uses contemplated as part of buildout of the Specific Plan EIR. The project would not result in a change in the level of development proposed or a change in project footprint/location. Adopted Mitigation Measures identified in the Specific Plan EIR would remain applicable to the proposed project. Thus, the project would not result in any new significant cumulative impacts or a substantial increase in severity of cumulative impacts than were addressed in the Specific Plan EIR. 369
Addendum
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 4-1 4 CONCLUSION
As demonstrated above, implementation of the proposed project would not result in any new or substantially more severe impacts than those identified in the Specific Plan EIR. The final design of the project does not require revisions to the analysis previously of the certified Specific Plan EIR, nor are there substantial changes that would occur with respect to the circumstances under which the project would be undertaken. As a result, no new environmental document is required, consistent with State CEQA Guidelines Section 15162. 370
Conclusion Addendum Ascent
City of Lincoln
4-2 SUD-B Northeast Quadrant Specific Plan EIR Addendum This page is intentionally left blank.
371
Addendum
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 5-1 5 REFERENCES
CAL FIRE. See California Department of Forestry and Fire Protection.
California Department of Conservation. 2025. California Important Farmland Finder. Accessed December 16, 2025.
Available: https://maps.conservation.ca.gov/DLRP/CIFF/
California Department of Forestry and Fire Protection. 2025. Fire Hazard Severity Zone Viewer. Accessed December 17, 2025. Available: https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/ .
City of Lincoln. 2025. City of Lincoln Zoning and Land Use. Accessed December 16, 2025. Available:
https://experience.arcgis.com/experience/fadaa0d25cb94b14b2a217033c8a441a/?draft=true&org=CityOfLinc oln#data_s=id%3A8f780e113baf4e5a81ba5963922a6af4-18af0bd5480-layer-41%3A24623 Department of Toxic Substance Control. 2025. EnviroStor. Available:
https://www.envirostor.dtsc.ca.gov/public/map/?myaddress=lincoln%2C+ca. Accessed November 13, 2025.
DKS Associates. 2025. Lincoln SUD-B VMT Analysis. Project #P25988. DKS Associates.
DKS. See DKS Associates.
DOC. See California Department of Conservation.
DTSC. See Department of Toxic Substance Control.
Federal Emergency Management Agency. 2025. FEMA Flood Map Service Center. Available:
https://msc.fema.gov/portal/search?AddressQuery=lincoln%2C%20ca. Accessed: November 11, 2025.
FEMA. See Federal Emergency Management Agency.
FRAYJI Design Group. 2019 (March). SUD-B Northeast Quadrant Specific Plan. California Governor’s Office of Planning and Research. 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA. April 2018. Accessed:
December 8, 2025. Available: https://lci.ca.gov/docs/20180416-743_Technical_Advisory_4.16.18.pdf. Accessed December 17, 2025.
Placer County. 2020. Placer County Conservation Program. Western Placer County Habitat Conservation Plan/Natural Community Conservation Plan. Available: https://www.placer.ca.gov/DocumentCenter/View/81088/Placer - County-Conservation-Program-Western-Placer-County-HCPNCCPPDF. Accessed December 18. 2025.
US Fish and Wildlife Service. 2021. Recovery Plan for Rusty Patched Bumble Bee (Bombus affinis). Available:
https://www.fws.gov/sites/default/files/documents/Final%20Recovery%20Plan%20_Rusty%20Patched%20Bu mble%20Bee_2021.pdf. Accessed November 13, 2025.
USFWS. See US Fish and Wildlife Service.
Williams, P.H., R. W. Thorp, L. L. Richardson, and S. R. Colla. 2014. Bumble Bees of North America: An Identification Guide. Princeton University Press.
Xerces Society. 2018. A Petition to the State of California Fish and Game Commission. Available:
https://xerces.org/sites/default/files/2019-10/CESA-petition-Bombus-Oct2018.pdf. Accessed November 13, 2025.
372
References Addendum Ascent
City of Lincoln
5-2 SUD-B Northeast Quadrant Specific Plan EIR Addendum This page is intentionally left blank.
373
List of Preparers Addendum Ascent
City of Lincoln
SUD-B Northeast Quadrant Specific Plan EIR Addendum 6-1 6 LIST OF PREPARERS
City of Lincoln (Lead Agency)
Mel Pabalinas .........................................................................................................................................................................Planning Manager Thomas Cruickshank ............................................................................................................................................................. Associate Planner Ascent, Inc. (CEQA Compliance)
Pat Angell ................................................................................................................................................................................................... Principal Kirsten Burrowes ...................................................................................................................................................................... Project Manager Bryn Kirk .......................................................................................................................................................................... Environmental Planner Nicole Wang .................................................................................................................................................................. Environmental Planner Alyssa Luna ....................................................................................................................................................................................... GIS Specialist Riley Smith ........................................................................................................................................................................... Publishing Specialist
374
List of Preparers Addendum Ascent
City of Lincoln
6-2 SUD-B Northeast Quadrant Specific Plan EIR Addendum This page is intentionally left blank.
375
EXHIBIT B
SUD B NEQ Specific Plan
Mitigation Monitoring and Reporting
Program (MMRP)
376
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-1
APPENDIX L TO THE SUD-B NEQ SPECIFIC PLAN EIR
MITIGATION MONITORING AND REPORTING PROGRAM
1 INTRODUCTION
The California Environmental Quality Act (CEQA) Guidelines Section 15097 requires that whenever a public agency approves a project based on a Mitigated Negative Declaration or an Environmental Impact Report (EIR), the public agency shall establish a mitigation monitoring and reporting program to ensure that all adopted mitigation measures are implemented.
This mitigation monitoring and reporting program (MMRP) is intended to satisfy this requirement of the CEQA Guidelines as it relates to the Special Use District B (SUD -B) Northeast Quadrant Specific Plan (proposed project) . This MMRP will be u sed by City of Lincoln staff to ensure compliance with all mitigation measures identified in the SUD-B Northeast Quadrant Specific Plan EIR is achieved during project implementation and operation. The MMRP provides for monitoring of construction activities, as necessary, and in the field identification and resolution of environmental concerns.
377
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-2
INTENTIONALLY LEFT BLANK
378
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-3
2 STANDARD MITIGATION MONITORING PROGRAM
City of Lincoln has adopted a standard mitigation monitoring program. This program requires that mitigation measures adopted for projects requiring discretionary City approvals, such as the SUD- B Northeast Quadrant Specific Plan project, be included in the conditions of approval for those projects and that issuance of any of the permits or city actions listed below must be preceded by a verification by city staff that certain conditions of approval/mit igation measures have been met.
Compliance with conditions of approval is monitored by the City through a variety of permit and review processes, including:
• Improvement Plans approval (this approval must be obtained prior to issuance of grading or building permits)
• Grading Permit issuance
• Improvements construction inspection
• Final map recordation
• Acceptance of subdivision improvements as complete
• Building permit issuance
• Certificates of Occupancy
The mitigation measures for the SUD-B Northeast Quadrant Specific Plan project included in the EIR would be monitored through the City’s Standard Mitigation Monitoring Program, as indicated in the text of each mitigation measure. The following table provides the full text of each mitigation measure and identifies the specific permit(s) or approval(s) from the Standard Mitigation Monitoring Program that the City would use to verify compliance with each, or another monitoring mechanism that would be used if t he mitigation measure cannot be verified through the C ity’s Standard Mitigation Monitoring Program.
Mitigation Monitoring Program Description
City of Lincoln will coordinate monitoring activities and document the implementation of mitigation measures for each project phase. Table 1 lists each mitigation measure as identified in the Final EIR and the associated implementation, monitoring /reporting, timing and performance requirements. The table includes:
1. the full text of each applicable mitigation measure;
2. the party or parties responsible for implementation and monitoring of each measure and any reporting requirements;
379
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-4
3. the timing of implementation of each mitigation measure , including any ongoing monitoring and/or reporting requirements; and
4. performance criteria by which to ensure mitigation requirements have been met.
Following completion of the monitoring and reporting process, the final monitoring results, as well as annual reports where required, will be recorded and incorporated into the project file maintained by the City of Lincoln.
380
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-5
3 SPECIAL USE DISTRICT B (SUD-B) NORTHEAST QUADRANT SPECIFIC PLAN
MITIGATION MONITORING AND REPORTING PROGRAM
No mitigation measures are required for the following resources:
• Agriculture and Forestry Resources
• Hazards and Hazardous Materials
• Population and Housing
• Public Services
• Urban Decay
• Utilities and Service Systems
Mitigation measures are required for the potentially significant impact described in the table below.
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
Aesthetics
MM-AES-1 Commercial development shall avoid
mirrored or highly reflective building finish materials, and shall avoid excessively bright upward lighting, such as search lights, laser light displays, or distracting lights that could be mistaken for airport lights.
Project applicant
City of Lincoln Prior to approval of
building permits
The lack of mirrored or
highly reflective building finish
materials or excessive upward
lighting
Air Quality
MM-AQ-1 Prior to approval of any construction-related
permits, the project applicant or its designee shall place the following requirements on all plans, which shall be implemented during grading of each phase of the
proposed project to minimize NOx and PM10 emissions:
• Off-road heavy-duty diesel-powered
construction equipment with engines rated as
75 horsepower or greater, shall be equipped
with Tier 4 Final or better diesel engines,
except where Tier 4 Final or better engines are
not available for specific construction
equipment. The City shall verify and approve all
pieces within the construction fleet that would
not meet Tier 4 Final standards;
Project applicant or its
designee
City of Lincoln Prior to approval of
any construction-
related permits and
implemented during
grading of each phase
Implementation of requirements
minimizing NOx and PM10
emissions
381
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-6
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
• Minimize simultaneous operation of multiple
construction equipment units. During
construction, vehicles in loading and unloading
queues shall not idle for more than 5 minutes
and shall turn their engines off when not in use
to reduce vehicle emissions;
• All construction equipment shall be properly
tuned and maintained in accordance with
manufacturer’s specifications;
• The use of electrical or natural gas-powered
construction equipment shall be employed
where feasible including forklifts and other
comparable equipment types;
• The use of catalytic reduction for gasoline-
powered equipment shall be employed where
feasible;
• All diesel-fueled on-road construction vehicles
shall meet the emission standards applicable to
the most current year to the greatest extent
possible. To achieve this standard, new
vehicles shall be used, or older vehicles shall
use post-combustion controls that reduce
pollutant emissions to the greatest extent
feasible;
• In order to control dust, an operational watering
truck shall be on site during construction hours.
In addition, dry chemical sweeping is
prohibited. Watering at the construction site
shall be carried out in the compliance with
operating Placer County Air Pollution Control
District rules and City of Lincoln requirements;
• Fugitive dust shall not exceed 40% opacity and
not go beyond the project boundary at any time
as required by District Rule 228 Fugitive Dust
(Section 300). If lime or other drying agents are
382
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-7
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
used to dry out wet grading areas, they shall be
controlled so as to not exceed District Rule 228
Fugitive Dust limitations. The prime contractor
shall be responsible for having an individual,
CARB-certified to perform Visible Emissions
Evaluations (VEE), who shall routinely evaluate
compliance to Rule 228, Fugitive Dust on a
weekly basis;
• The prime contractor shall be responsible for
keeping adjacent public thoroughfares clean of
silt, dirt, mud, and debris, and shall “wet broom”
the streets (or use another method to control
dust as approved by the individual jurisdiction)
if silt, dirt, mud or debris is carried over to
adjacent public thoroughfares;
• During construction, traffic speeds on all
unpaved surfaces shall be limited to 15 miles
per hour or less;
• To control dust once grading is complete, the
prime contractor shall apply methods such as
surface stabilization, establishment of the
vegetative cover, paving, or other methods
approved by the City.vi. The prime contractor
shall suspend all grading activities when wind
speeds (including instantaneous gusts) are
high (typically winds greater than 25 miles per
hour), and dust is traveling offsite;
Stockpiles of dirt shall be covered when not being used or otherwise controlled to prevent erosion and/or dust.
MM-AQ-2 Application of low VOC coatings used for
exterior and interior of all surfaces of at least 50 g/L, which is beyond the local requirements (Placer County
Air Pollution Control District Rule 228, Architectural
Coatings).
Project applicant
City of Lincoln; Placer
County Air Pollution
Control District
Prior to approval of
building plans – to be
noted on plans and
specifications.
Application of low VOC
coatings
383
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-8
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM-AQ-3 To reduce operational emissions of ROG, NOx,
and PM10 emissions, the following Placer County Air
Pollution Control District Standard Operational Air Quality Mitigation Measures shall be implemented as part of the proposed project’s final design:
• Diesel trucks shall be prohibited from idling
more than five minutes. Prior to the issuance of
a Building Permit, the applicant shall show on
the submitted building elevations that all truck
loading and unloading docks shall be equipped
with one 110/208 volt power outlet for every
two dock doors. Diesel Trucks idling for more
than the allotted time shall be required to
connect to the 110/208 volt power to run any
auxiliary equipment. A minimum 2’x3’ signage
which indicates “Diesel engine Idling limited to
a maximum of five minutes” shall be included
with the submittal of building plans.
• Prior to Design Review approval, the Site Plan
shall show that the applicant has provided the
number of preferential parking spaces for
employees that carpool/vanpool/rideshare as
required by the District. Such stalls shall be
clearly demarcated with signage as approved
by the Design Review Board.
• Prior to Design Review approval, the applicant
shall show that on-site bicycle racks will be
provided as required by the District.
Project applicant
City of Lincoln; Placer
County Air Pollution
Control District
Prior to approval of
building plans for each
project phase
Implementation of required
measures listed
384
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-9
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM-AQ-4 For individual projects to be
developed under the Specific Plan that exceed the
Placer County Air Pollution Control District criteria air pollutant thresholds after implementation of on- site
mitigation, the following measures shall be applied, as determined feasible through coordination with the
Placer County Air Pollution Control District:
• Establish mitigation off-site within the same
region (i.e., City of Lincoln, western Placer
County) by participating in an off-site mitigation
program, coordinated through the Placer
County Air Pollution Control District and/or by
funding energy-efficiency measures (e.g.,
installation of insulation and/or dual pane
windows in existing buildings), vehicle emission
reduction measures (e.g.,replace diesel school
buses with natural gas buses), and/or trip-
reduction measures (e.g., bike lanes and/or
NEV lanes on streets that do not have them);
and/or
• Participate in the District’s Off-site Mitigation
Program by paying the equivalent amount of
money, which is equal to the proposed projects
contribution of pollutants (ROG and NOx),
which exceeds the cumulative thresholds of 55
pounds per day. The actual amount to be paid
shall be determined, and satisfied per current
California Air Resource Board guidelines, at the
time of recordation of the Final Map (residential
projects), or issuance of a Building Permit (non-
residential projects).
Project applicant
City of Lincoln; Placer
County
At the time of
recordation of the Final
Map (residential
projects), or issuance of
a Building Permit (non-
residential projects).
• Establishment of mitigation
offsite by participating in an
off-site mitigation program,
coordinated through the
Placer County Air Pollution
Control District and/or by
funding energy-efficiency
measures or;
• Participation in the District’s
Off-site Mitigation Program,
determined by current
California Air Resource
Board guidelines
385
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-10
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
Biological Resources
MM-BIO-1 Workers Environmental Awareness Program.
All workers shall receive worker environmental
awareness training (WEAP) conducted by a qualified
biologist or an environmentally trained construction
foreman. WEAP may also be conducted through a video
created by a qualified biologist specifically for this project.
WEAP shall instruct construction workers to recognize all special-status species potentially present in the project area, identify their habitat, and the nature and purpose of protective measures including best management
practices (BMPs) and other required mitigation measures described in the EIR. They shall also be instructed to
avoid Markham and Auburn Ravines, prevent
construction-related fuel spills, and receive contact
information for the qualified biologist in the event a
special-status species is harmed or identified during
project construction.
Project applicant;
developers of individual
projects; and
construction contractors
City of Lincoln Prior to the start of
construction
Completion of training
conducted by a qualified
biologist or an environmentally
trained construction foreman
and
MM-BIO-2 Biological Monitor. During project construction activities, a biological monitor shall monitor all
construction activities in or adjacent to Auburn and
Markham Ravines, as well as perform regular nesting
bird surveys throughout the project area. The monitor
shall have the authority to immediately stop any activity that is likely to impact special-status species or order any reasonable measure to avoid or minimize impacts to fish and wildlife resources. If any previously unknown special- status species are found within the project area during project construction, the monitor shall inform the USFWS and/or CDFW within 1 day, as appropriate for the
species.
Project applicant;
developers of individual
projects and
construction contractors
City of Lincoln and
biological monitor
During project
construction activities in
or adjacent to Auburn
and Markham Ravines
Inclusion of biological monitor
during construction activities
386
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-11
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM-BIO-3 Wetlands and Waters of the U.S. Wetlands
and waters of the U.S. lost as a result of construction activities shall be replaced on a “no-net-loss” basis in accordance with USACE regulations and one of the
following methods:
a) If the PCCP is adopted and approved by the
agencies, participation in the PCCP shall
satisfy all mitigation requirements under CEQA.
b) If the PCCP has not been adopted and
approved by the agencies at the time the
project applicants wish to proceed with
permitting, the following process shall be
used in planning for replacement:
i. For new wetlands created on site in
open space areas, a conceptual on-
site wetlands mitigation plan shall be
prepared by a qualified biologist
pursuant to, and through consultation
with, the USACE, including an
agreed-upon replacement ratio of
wetlands with the USACE. The
mitigation plan shall quantify the total
jurisdictional acreage lost, describe
creation/replacement ratio for acres
filled, annual success criteria,
potential mitigation-sites, and
monitoring and maintenance
requirements.
ii. The plan may include funding
mechanisms for future maintenance
of the wetland and riparian habitat,
which may include an endowment or
other funding from the project
applicant.
iii. For those acres of wetlands or waters
of the U.S. lost to development that
Project applicant,
construction contractors
City of Lincoln and
USACE
Prior to the issuance of
a grading permit
• Participation in the PCCP or
• Completion of a conceptual
on-site wetlands mitigation
plan; USACE-approved
mitigation bank or otherwise
USACE-approved location
• CWA Section 404 permit
• CWA Section 404 Wetland
Fill permit
• CWA Section 401 water
quality certification
• Streambed Alteration
Agreement
387
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-12
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
cannot be replaced on site, the
project applicant shall compensate
for the loss of wetland habitat through
the purchase of mitigation credits at a
USACE-approved mitigation bank or
otherwise USACE-approved location.
The ratio of compensation shall be
determined in consultation with the
USACE as part of the CWA Section
404 permit process, but shall not be
less than 1:1.The project applicant
may pay in-lieu fees to the U.S. Army
Corps of Engineers (ACOE), CDFW,
and Regional Water Quality Control
Board according to their established
fee structures to compensate for the
removal of jurisdictional wetland
features within the project area.
Additionally, off-site permittee-
responsible compensatory mitigation
in the form of preservation, creation,
enhancement or restoration will be
accepted as outlined in the ACOE
Permittee-Responsible Mitigation
Guidance May 26, 2016 (Draft)
document.
iv. Prior to the City issuing a grading
permit, the project applicant shall
acquire the appropriate CWA Section
404 permit for filling of wetlands and
other waters of the U.S. in the project
area. In addition to the CWA Section
404 Wetland Fill permit, a CWA
Section 401 water quality certification
shall also be required in conjunction
with the Section 404 permit.
388
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-13
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
v. For any construction activities
affecting the bed, bank, or associated
riparian vegetation of any streams or
lakes subject to CDFW jurisdiction
(such as Markham Ravine and
Auburn Ravine), then a Streambed
Alteration Agreement shall be
obtained from CDFW, pursuant to
Section 1600 of the California Fish
and Game Code. If required, the
project applicant shall coordinate with
CDFW in developing appropriate
mitigation, and shall abide by the
conditions of any executed permits
for any work related to on-site
streams or associated riparian areas.
MM-BIO-4 Native Oak Tree Planting. The project applicant shall, to the extent feasible, design the project to retain protected trees and to protect on site trees during construction activities. If these trees cannot be retained in place, then the project applicant shall compensate for the loss of oaks on the project site based on the fee structure and guidance stated in the City of Lincoln Municipal Code. This may require either a fee payment to the City, or planting/establishment of native oak trees outside of the project area.
Project applicant,
construction contractors
City of Lincoln • Review tree impacts
prior to approval of
improvement plans
• Mitigation plan
and/or fees approved
prior to grading
permit issuance
• Retention of all feasible native
oaks onsite
• Completion of compenstation
for the loss of oaks as stated
in the stated in the City of
Lincoln Municipal Code
MM-BIO-5 Location of Construction Activities. Wherever
feasible, construction and stockpiling of materials shall be located away from Markham and Auburn Ravines,
outside of the 100-year floodplain, and other sensitive habitats, as determined by the qualified project biologist.
In areas that cannot be feasibly avoided, the project
biologist shall monitor the activity on a daily basis to ensure impacts to native wildlife are avoided.
Project applicant,
construction contractor
City of Lincoln Construction and
staging areas to be
identified prior to start of
construction
Materials stockpiled outside of
the 100-year floodplain, and
other sensitive habitats and
away from Markham and
Auburn Ravines
389
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-14
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM BIO-6 Rare Plant Surveys and Mitigation. The
project applicant shall retain a qualified biologist/botonist to conduct protocol-level plant surveys. Suitable habitat may occur on the northerly 72.6 acres of the project site for the following species: dwarf downingia (Downingia
pusilla), Ahart's dwarf rush (Juncus leiospermus var.
ahartii), Red Bluff dwarf rush (Juncus leiospermus var. leiospermus), and Legenere (Legenere limosa).
The surveys shall be conducted during the appropriate
blooming periods (May to November). These plant
surveys shall be conducted in accordance with 2009
California Department of Fish and Wildlife (CDFW) rare
plant survey protocols. The results of the survey shall be summarized in a report and submitted to CDFW and
USFWS, and would be valid for two years.
If rare plants are present and cannot be avoided, the
project applicant compensate for the loss of habitat,
either on-site or off-site at a minimum of ratio of 1:1.
Mitigation for losses could include replacing the amount, type, and value of habitat lost to project construction through an accredited mitigation bank, if approved by
USFWS and CDFW.
Project applicant,
construction contractors
City of Lincoln; USFWS
and CDFW
Surveys conducted
during the appropriate
blooming periods (May
to November) prior to
construction
• Identification and avoidance
of rare plants
• Compensation from
unavoidable loss of habitat,
either on-site or off-site at a
minimum of ratio of 1:1
MM BIO-7 Vernal Pool Crustacean Avoidance and
Mitigation. If suitable habitat for vernal pool crustaceans cannot be avoided during construction activities, the
project applicant shall comply with applicable federal ESA regulations for mitigation of vernal pool crustaceans. The project applicant can either assume presence of vernal
pool crustaceans within suitable habitat, or can conduct protocol-level surveys for vernal pool invertebrate
species. The project applicant shall be responsible for offsetting the loss of any vernal pool crustacean habitat using one of the following methods:
Project applicant,
construction contractors
City of Lincoln, CDFW Prior to the issuance of
grading permits
• Participation in the PCCP or
• Completion of a mitigation as
determined by the USFWS
390
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-15
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
a) If the PCCP has been adopted by the County,
the City, and approved by the agencies, the
project applicant shall comply with the PCCP
and that participation shall satisfy all of the
mitigation requirements for this impact.
b) If the PCCP has not been adopted by the
County and City and/or has not been approved
by the agencies, the extent of any necessary
compensatory mitigation shall be determined in
consultation with the USFWS, but shall not be
less than 1:1. Typically, recommended
mitigation for the loss of vernal pool crustacean
habitat has been at a ratio of 2:1 acres for
preservation and 1:1 acres for creation.
MM BIO-8 Western Pond Turtle Avoidance and
Relocation.
a) Prior to any work in suitable habitat, the project
applicant/contractor shall arrange for a pre-
construction survey for western pond turtles
(WPT) to be conducted by a qualified biologist
not more than 48 hours prior to the
commencement of site disturbance.
b) If WPT are determined to be present within the
stream or pond, and the feature is to be
retained, exclusionary fencing shall be used to
prevent the turtle(s) from entering the
construction area. The location of the fence
shall be determined by a qualified biologist. Any
turtles found in or near the construction zone
shall be relocated to an appropriate area of
suitable habitat a minimum of 100 feet from any
active construction zone. Measures shall be
implemented to ensure that the drainages or
irrigation pond shall continue to provide
adequate habitat for the WPT during and after
Project applicant,
construction contractors
City of Lincoln, CDFW Prior to any work in or
adjacent to Markham or
Auburn Ravines
• Pre-construction survey
conducted by a qualified
biologist not more than 48
hours prior to the
commencement of site
disturbance.
• Construction of exclusionary
fencing during construction
period
• Removal of Western Pond
Turtles to a suitable body of
water in Placer County as
approved by CDFW
391
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-16
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
construction by protecting water quality and
ensuring that the reduction of drainage from the
project site does not substantially diminish the
water levels in the pond.
c) If the stream or irrigation pond cannot be
retained, the project applicant shall relocate
any WPT found during surveys in a manner
developed by a qualified biologist and approved
by the CDFW to a suitable body of water in
Placer County.
MM BIO-9 Nesting Bird Avoidance.
a) If construction would occur during the bird
nesting season (generally March 1-August 30
for the native bird species likely to occur on the
project site), a pre-construction nest survey
shall be conducted within 14 days prior to the
beginning of construction activities by a
qualified biologist to identify active nests within
100 feet of construction activities (for
songbirds) and within 300 feet for raptors. If
active nests are found, a temporary buffer shall
be established by a qualified biologist around
the nest and all ground-disturbing and other
construction-related activities shall be
postponed/halted until the nest is vacated and
juveniles have fledged and are no longer
dependent upon the nest, as determined by the
biologist from ongoing monitoring, and there is
no evidence of a second attempt at nesting.
The no-disturbance buffer shall generally be
100 feet for passerine bird species and 300 feet
for raptor species (other than Swainson’s hawk;
see MM BIO-10) or as otherwise determined by
the biologist taking into consideration such
Project applicant,
construction contractors
City of Lincoln If construction would
occur during generally
March 1-August 30, a
pre-construction nest
survey shall be
conducted within 14
days prior to the
beginning of
construction activities
• Identification of active nests
within 100 feet of
construction activities (300
feet for raptors)
• Creation of a no disturbance
buffer
• Submittal of a report that
includes a description of the
methodology and results and
a map
392
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-17
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
factors as topography, the type, duration, and
extent of disturbance, and the species of bird
potentially affected. The buffer zone shall be
delineated by high visibility temporary
construction fencing. If no active bird nests are
identified within the survey area, no further
mitigation would be required.
b) A report shall be submitted to the City of
Lincoln, following the completion of the bird
nest survey that includes, at a minimum, the
following information:
i. A description of the methodology and
results of the survey including dates of
field visits, the names of survey
personnel (and their qualifications),
survey results, and a list of references
cited and persons contacted.
ii. A map showing the location(s) of any
protected bird nests observed on the
project site.
MM-BIO-10 Swainson’s Hawk Nest Avoidance and
Mitigation.
a) The project applicant shall retain a qualified biologist to conduct a Swainson’s hawk nest survey during
the nesting season of the same calendar year that
construction is expected to begin, and prior to the
issuance of any grading permits. The survey shall
be conducted pursuant to timing and methodology
criteria outlined in the Swainson’s Hawk Technical
Advisory Committee 2000 survey protocol which
includes all suitable nest habitat within ½ mile of the construction envelope. If this survey does not
identify any nesting Swainson’s hawk within the
survey area, no further mitigation would be
required.
Project applicant,
construction contractors
City of Lincoln During the the nesting
season of the same
calendar year that
construction is
expected to begin,
and prior to the
issuance of any
grading permits. any
nesting
• Identification of any nesting
Swainson’s hawk
• No construction activity or
other project-related activities
that could cause nest
abandonment or forced
fledging, shall be initiated
within 1/4-mile (buffer zone)
of an active nest, or as
otherwise determined by the
biologist
• Receipt of a Management
Authorization from the CDFW
in the event of the removal of
a nest tree.
393
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-18
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
b) Should any active Swainson’s hawk nests be
located within the survey area, no construction
activity (e.g., heavy equipment operation
associated with construction, human activities,
etc.) or other project-related activities that could
cause nest abandonment or forced fledging,
shall be initiated within 1/4-mile (buffer zone) of
an active nest, or as otherwise determined by
the biologist taking into consideration such
factors as topography, the type, duration, and
extent of disturbance, and the age of any young
in the nest. Such activity shall be postponed
until the nest is vacated and juveniles have
fledged and are no longer dependent upon the
nest, as determined by the biologist from
ongoing monitoring, and there is no evidence of
a second attempt at nesting. The buffer zone
may be increased if, as determined by the
biologist during ongoing nest monitoring, the
adult birds exhibit behavior that could lead to
unnatural prolonged absences from the nest or
nest abandonment. The buffer zone shall be
delineated by high visibility temporary
construction fencing.
c) Nest trees should not be removed to the extent
feasible. If a nest tree must be removed, a
Management Authorization (including
conditions to off-set the loss of the nest tree)
must be obtained from CDFW with the tree
removal period specified in the Management
Authorization, generally from October 1 to
February 1.
394
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-19
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM BIO-11 Swainson’s Hawk Foraging Habitat Mitigation.
The project applicant, in consultation with CDFW, shall mitigate for loss of any Swainson’s hawk foraging habitat by one of the following methods:
a) If the PCCP has been adopted by the County,
the City, and approved by the agencies, the
project applicant shall comply with the PCCP
and that participation shall satisfy all of the
mitigation requirements for this impact.
b) If the PCCP has not been adopted by the County
and City and/or has not been approved by the
agencies, the project applicant shall mitigate at
a ratio of at least one acre of suitable foraging
habitat for every one acre developed by the
proposed project. T he project applicant shall
provide for the long- term endowment of
compensatory mitigation lands by funding a
management endowment (the interest on which
shall be used for managing the mitigation lands)
at a per acre rate (adjusted annually for inflation
and varying interest rates). The project applicant
shall submit a letter of approval from CDFW for
the mitigation program for Swainson’s impacts
to the City of Lincoln prior to the issuance of
grading permits. As an alternative, the project
applicant may p
urchase conservation
easements or fee title to suitable Swainson’s
hawk foraging habitat to protect the habitat from
urban development, or purchase Swainson’s
hawk habitat credits at an agency -approved
mitigation bank.
A.
Project applicant,
construction contractors
City of Lincoln, CDFW Prior to the issuance of
grading permits
• Participation in the PCCP or
• Compensatory habitat is
established through an
approved wetland mitigation
bank and/or is constructed
pursuant to County and
resource agency approvals
• Submittal of a letter of
approval from CDFW to the
City
• Or purchase of a
conservation easements or
fee title to suitable
Swainson’s hawk foraging
habitat
395
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-20
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM-BIO-12 Markham and Auburn Ravines. Markham and
Auburn Ravines shall both be avoided during project activities to reduce impacts of noise, light and habitat destruction to wildlife species that regularly use these areas for local migration, cover and foraging. For any work that would involve disturbance of Auburn or Markham Ravine the City shall
ensure grading permits and/or improvements plans, as
appropriate, include the following requirements:
a) To the extent feasible, the project shall be
designed to avoid direct or indirect impacts to
Auburn or Markham Ravines, or to the water
quality flowing to Auburn or Markham Ravines.
If work in Auburn or Markham Ravines cannot
be avoided, then the following mitigation
measures shall apply.
b) Restrict work in Auburn or Markham
Ravines to low -flow periods between June
15 and October 15 to avoid effects on adult
or juvenile steelhead and salmon life stages
during their migratory seasons.
c) Store all equipment outside of all waterways.
Install a silt fence around the perimeter of all
waterways where construction is to occur
adjacent to waterways. The staging areas shall
be situated a minimum of 50 feet from existing
drainages.
d) Install Environmentally Sensitive Area (ESA)
fences in the vicinity of work along Auburn or
Markham Ravines. The ESA fencing shall be
delineated on the final plans and the fence
shall be installed and remain on-site until the
project is completed.
e) Install silt fences and/or fiber rolls on the slopes adjacent to the work area to prevent silt from
entering Auburn or Markham Ravines.
Project applicant,
construction contractors
City of Lincoln Prior to approval of
improvement plans or
issuance of grading
plans that would affect
Markham or Auburn
Ravines
• Avoidance of Markham and
Auburn Ravine during project
activities or
• Completion of items outlined
in the mitigation measure
396
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-21
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
f) If dewatering is necessary along portions of
Auburn or Markham Ravines, use appropriate
temporary coffer dams to dewater the
construction sites and divert water through the
area during the construction period to prevent
impeding creek flow or water flow through the
work areas. If dewatering at a site is required, a
qualified biologist shall be present during the
dewatering period to inspect and ensure that
steelhead shall not be trapped within the
temporary coffer dams. If steelhead are found,
a qualified biologist shall capture and relocate
these fish to an appropriate area away from the
construction site. The project applicant or their
representative shall submit for approval the
dewatering and fish capture and relocation
plans to the NOAA and CDFW once the design
plans are finalized.
g) Maintain erosion controls during the
construction periods.
h) At the completion of the construction project,
remove from the streambed all materials used
to maintain flow and divert water from the area
during the construction period, including coffer
dams, pipes, filter fabric, and gravel.
i) Dispose of all excess soil at an approved
upland site.
j) Remove all project-introduced material once the
work is complete.
k) Recontour any disturbed stream channel areas,
to the extent practicable, to pre-project
conditions or better.
l) Use reflectors on portable light trees to focus
the light on the work area and to minimize the
amount of light spilling over to adjacent areas
during any night work.
397
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-22
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
MM BIO-13. Wildlife Movement Corridor Protection. To the extent feasible, construction of the project’s open space shall be designed to minimize the restriction of wildlife movement through the project area, specifically along and through Markham and Auburn Ravines. This shall include design
measures that provide the greatest amount of space feasible underneath bridge or culvert structures such that wildlife species are not forced to cross roadways or move into urban areas to move from one area of natural habitat to another.
All outdoor lighting associated with the project shall be designed to minimize light pollution into the open space or adjoining undeveloped land, except where it is necessary for public safety or security. Minimization measures may include light fixture placement (e.g., as low to the ground as possible), lamp designs (e.g., shielding, low glare, or no lighting), directing light away from open space or undeveloped lands, or other means to avoid or minimize light pollution.
Project applicant
City of Lincoln Prior to approval of
improvement plans
• Inclusion of design measures
that provide the greatest
amount of space feasible
underneath bridge or culvert
structures
• Minimization of outdoor lighting
Cultural Resources
MM-CUL-1 Discovery of Archaeological /
Paleontological
Resources: In the event that archaeological /
paleontological resources are discovered during ground
disturbing activities, grading and construction work within 100 feet of the find shall be suspended until the
significance of the features can be determined by a
qualified professional archaeologist / paleontologist as appropriate. The applicant shall immediately notify the City of Lincoln Community Development Director, who
will coordinate investigation of the site with a qualified archaeologist or paleontologist as needed to assess the resource (i.e., whether it is a “historical resource”, a “unique archaeological resource”, or “unique
paleontological resource”) and provide proper
management recommendations should potential impacts
Project applicant,
construction contractor
City of Lincoln During construction In the event of accidental discovery, suspension of
construction activity within 100
of discovery and notification of
the City of Lincoln Community
Development Director
398
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-23
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
to the resource be found to be significant. Possible
management recommendations for historical or unique
archaeological/paleontological resources could include
resource avoidance or, where avoidance is infeasible in light of the project or is unnecessary to avoid significant effects, data recovery excavations. In consultation with the qualified staff, the contractor shall implement any measures deemed by the Community Development
Director to be necessary and feasible to avoid or
minimize significant effects to the resource.
MM-CUL-2 Accidental Discovery of Human Remains.
Pursuant to Section 5097.98 of the California Public
Resources Code and Section 7050.5 of the California
Health and Safety Code, as well as California
Environmental Quality Act Guidelines Section 15064.5(e), in the event of the discovery of human remains, work
shall be suspended within 100 feet of the find, and the Placer County Coroner/Sherriff and the City of Lincoln
Community Development Director shall be immediately
notified. The County Coroner/Sherriff will determine if an investigation is necessary. If the remains are determined to be Native American:
1. The Coroner shall contact the Native American
Heritage Commission (NAHC) within 24 hours.
2. The NAHC shall identify the person or persons
it believes to be the most likely descendent
(MLD) from the deceased Native American.
3. The MLD shall have an opportunity to make a
recommendation to the landowner or the
person responsible for the excavation work, for
means of treating or disposing of, with
appropriate dignity, the human remains and
any associated grave goods as provided in
Public Resources Code Section 5097.98.
Project applicant,
construction contractor
City of Lincoln During construction In the event of accidental discovery, suspension of
construction activity within 100
of discovery and notification of
the Placer County
Coroner/Sherriff and the City of
Lincoln Community
Development Director
399
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-24
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
If the Native American Heritage Commission is unable to identify a descendant or the descendant failed to make a recommendation within 24 hours after being notified by
the commission, the City and/or County will notify the
United Auburn Indian Community (UAIC) Tribal Council
and solicit their input prior to allowing work to resume.
Geology and Soils
MM-GEO-1 The following notes, or recommendations of
the design-level geotechnical report, whichever is more detailed and stringent, will be included on project plans to be approved by the Building Division of the City of Lincoln Community Development Department prior to receipt of
grading and building permits:
• The upper 18 inches of subgrade at building
pads, sidewalk, pavements, and concrete
flatwork shall be replaced with compacted on-
site soils with low to very low expansion
potential and/or non-expansive imported
engineered fill mixed with lime.
• On-site soils and imported engineered fill to be
used to replace expansive clays shall be
evaluated/tested and approved by project
geotechnical engineer prior to establishment of
fill pads during construction.
• Subgrade soil replacement/lime treatment shall
extend to at least 5 feet (horizontally) from the
outer edge of the footings and 2 feet
(horizontally) from the outer edge of flatwork,
sidewalks, and pavement.
• Footings shall be constructed with a minimum 24-
inch embedment below the lowest adjacent grade.
• If soils are treated with lime, lime treatment
shall be performed by a specialty contractor
experienced in this work and in accordance
with Caltrans Standard Specifications.
Project applicant, City of Lincoln
Community
Development
Department, Building
Division
Prior to approval of
grading or building
permits
Incorporate recommended
measures into project design
400
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-25
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
• If soils are treated with lime, lime treatment
submittal (including proposed equipment,
materials, and construction procedures) shall
be provided to applicant’s geotechnical
engineer for review at least 2 weeks prior to
construction.
• If soils are treated with lime, Plasticity Index
and Expansion Index tests shall be performed
on lime-treated soils during construction to
assure that they meet the project requirements.
• If soils are treated with lime, lime-treated soils
shall be removed from landscape areas.
Greenhouse Gas Emissions
MM-GHG-1 Greenhouse Gas Emissions Reduction
Measures. The following GHG emission reduction
measures shall be implemented:
All residential buildings shall:
• Meet or exceed CALGreen Tier 2 requirements
in place at the time of Building Permit issuance.
• Be pre-plumbed and structurally engineered for
the future installation of a complete solar
energy system.
• Include a tankless water heating system, a
whole house ceiling fan, and “Energy Star”
appliances (stoves, dishwashers, and any other
appliances typically included within the initial
installation by the builder).
• Include an energy efficient air conditioning
unit(s) that exceeds the SEER ratio by a
minimum of two points at the time of building
permit issuance.
• Include programmable thermostat timers.
• Include exterior outlets on all single-family and
multi-family buildings to allow the use of electrically- powered landscape equipment.
Project applicant City of Lincoln • Prior to approval of improvement plans
• Prior to the issuance
of a building permit
Incorporate features into project
design
401
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-26
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
• Include wiring for at least one electric car
charging station.
• Prior to the issuance of a Building Permit, the
floor plans and/or exterior elevations submitted
in conjunction with the Building Permit
application for each residence within the
approved subdivision shall show that each
residence shall only utilize low flow water
fixtures such as low flow toilets, faucets,
showers, etc.
• Prior to approval of Improvement Plans the
applicant shall only show energy efficient lighting for all street, parking, and area lighting associated with
the project, including all on-site and off-site lighting.
All non-residential buildings shall:
• Be pre-plumbed and structurally engineered for
the future installation of a complete solar
energy system.
• Install photovoltaic rooftop energy systems on all
community buildings and any commercial buildings
over 100,000 square feet.
• Use “Energy Star” rated (or greater) roofing
materials.
• Use both indoor and outdoor energy efficient
lighting that meets or exceeds Title 24
requirements.
• Prior to the issuance of a Building Permit, the
floor plans and/or exterior elevations submitted
in conjunction with the Building Permit
application shall show that the proposed project
includes a complete solar water heating
system.
402
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-27
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
• Include an energy efficient heating system and
an air conditioning system that exceeds the
SEER ratio by a minimum of two points at the
time of building permit issuance.
• Only use low flow water fixtures such as low
flow toilets, faucets, showers, etc.
• Only use programmable thermostat timers.
• Include enough bike parking facilities to meet
peak demand. This will include:
o Providing secure bicycle racks and/or
storage within 200 yards of a building
entrance for five percent or more of all Full
Time Equivalent (FTE) staff (measured at
peak periods) and provide showers and
changing facilities in the building, or within
200 yards of a primary staff building
entrance, for 0.5 percent of FTE staff
(measured at peak periods), or
o Provide secure bike racks and/or storage
within 200 yards of a public building
entrance according to the following
guidelines based on project square
footage:
Up to 5,000 square feet, two or more
bicycle racks,
5,001 – 20,000 square feet, three or
more bicycle racks,
20,001 – 50,000 square feet, six or
more bicycle racks,
More than 50,000 square feet, ten or
more bicycle racks.
Prior to approval of Improvement Plans, the
applicant shall only show energy efficient
lighting for all street, parking, and area lighting
associated with the proposed project, including
all on-site and off-site lighting.
403
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-28
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
o Install two 110/208 volt power outlets for every
two loading docks.
o Provide preferential parking for carpool,
shared, electric, and hydrogen vehicles.
o Include pedestrian-friendly paths and
cross walks in all parking lots.
o Pave all parking lots with reflective
coatings (albedo = 0.30 or better). This
measure is considered feasible if the
additional cost is less than 10 percent of
the cost of applying a standard asphalt
product.
o Maximize the amount of drought tolerant
landscaping by minimizing the amount of
turf in all areas where this option is
feasible.
o Ensure recycling of construction debris
and waste through administration by an
on-site recycling coordinator and presence
of recycling/separation areas
Hydrology and Water Quality
HYD-1 Storm Water Quality Plan: Through all phases of
construction, development, and operation of the
proposed project, the project applicant or designee,
homeowners’ association (HOA), and/or project
contractor, as applicable, shall conduct planning, design, construction, and maintenance activities consistent with the performance criteria, design standards, and water
quality best management practices contained in the
project’s Master Drainage Study and Storm Water Quality Plan (SWQP) (Appendix F). For each phase of
development, a project-specific SWQP shall be
developed and approved by the City of Lincoln to show
parcel-level source control measures, structural treatment controls, and low-impact development (LID) designs,
refined as necessary from the master SWQP. This
the project applicant or
designee, homeowners’
association (HOA),
and/or project
contractor
City of Lincoln Prior approval of
improvement plans for
each project phase
Completion of conduct planning,
design, construction, and
maintenance activities
consistent with the performance
criteria, design standards, and
water quality best management
practices contained in the
project’s Master Drainage Study
and Storm Water Quality Plan
(SWQP)
404
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-29
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
includes meeting or exceeding the requirements of the
Small Municipal Separate Storm Sewer System (MS4)
Permit (SWRCB Order 2013-0001-DWQ, as amended),
Section 8.6 of the City’s Municipal Code (Post-
Construction Storm Water Runoff Control), and the West
Placer County Storm Water Quality Design Manual.
The developers, their contractors, and the planned
community’s governance entities shall be required to
select, size, and maintain the LID designs and implement water quality best management practices (BMPs) to
address the following, consistent with Appendix F:
• Post-Construction Source Control BMPs:
Source control BMPs shall be incorporated into
site development plans and maintenance
operations to avoid pollutant generating
sources and activities. Examples include
ensuring the protection of waste and hazardous
materials from contact with stormwater,
minimizing the use of pesticides and fertilizers
through integrated pest management and
landscape design, ensuring vehicle
maintenance occurs indoors or in covered
areas, and plumbing interior floor drains to the
sewer system.
• LID Treatment BMPs: Site preservation
practices coupled with small-scale distributed
treatment measures that rely on vegetation and
soils, or systems that mimic the treatment
obtained by soils and vegetation and soils, shall
comprise the LID control approach. LID BMPs
include strategies such as stream setbacks, tree
and natural landscape preservation,
disconnection of impervious surfaces, green
roofs, porous pavement, vegetated swales, and
405
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-30
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
infiltration/bioretention swales/basins. LID BMPs
shall be sized to treat the volume of stormwater
runoff produced from the 85th percentile, 24-
hour storm event (water quality design volume),
and on-site LID retention BMPs shall be selected
to retain the water quality design volume to the
extent feasible. If it is infeasible to retain all or
part of the water quality design volume, LID
biotreatment BMPs shall be used and shall be
sized to capture and treat the remaining portion
of the water quality design volume. LID BMPs
may be located on site or at one of the water
quality basins shown in Appendix F. The
hydromodification performance standard shall be
achieved through on-site or regional LID BMPs,
on-site or regional flow control facilities, or a
combination thereof.
• Stormwater Facility Operation and
Maintenance: Depending on the type and
location of stormwater quality BMPs, either the
commercial land lessor or HOA shall be
responsible for maintenance of all LID,
treatment, and hydromodification control
facilities. Maintenance responsibility shall be
documented in the project’s conditions,
covenants, and restrictions. The commercial
leases or HOAs shall also prepare a written
operations and maintenance plan that identifies
the anticipated inspection/monitoring and
maintenance activities and frequencies for
each BMP, including coordination requirements
with City of Lincoln.
Prior to the vesting of subdivision maps and issuance of building permits, the City of Lincoln shall verify that all applicable water quality measures have been integrated
406
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-31
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
into applicable plans and maintenance agreements in
accordance with Appendix F, the MS4 Permit, and City
ordinances pertaining to stormwater quality.
HYD-2 Floodplain Modifications. Prior to issuance of
grading and building permits, parcel-level drainage
studies shall be submitted to the City of Lincoln Public Works Department for review and approval. Structures
and fill within the fringes of the Markham Ravine
floodplain shall be considered in a detailed hydraulic
analysis for their impacts on FEMA base flood elevations and flood extents. Final maps and improvements plans
shall not be approved by the City if the analysis shows the project would increase base flood elevations more
than 1 foot or otherwise place private property or public facilities at additional risk of flooding in a 100-year storm.
In addition, the applicant shall process through FEMA a new Conditional Letter of Map Revision (CLOMR) and
Letter of Map Revision (LOMR) in order to map the new
floodplain based on the future development and all of the proposed improvements such as bridges and drainage
outfalls. FEMA shall be provided with detailed hydraulic analyses, Base Flood Elevation Data and revised
floodplain maps showing the new floodplain and floodway limits. The applicant shall also coordinate with the Central Valley Flood Protection Board to obtain a permit prior to City approval of improvement plans.
Project applicant City of Lincoln Public
Works Department
Prior to issuance of
grading and building
permits
Review and approval of parcel-
level drainage studies
HYD-3 Implement Mitigation Measure BIO-12. Refer to
Section 4.4
Project applicant
City of Lincoln Prior to approval of
improvement plans or
issuance of grading
plans that would affect
Markham or Auburn
Ravines
• Avoidance of Markham and
Auburn Ravine during project
activities or
• Completion of items outlined
in the mitigation measure
407
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-32
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
Land Use
MM-LU-1 All water quality detention basins shall be
designed to avoid creating an increased attraction for
wildlife, consistent with FAA rules and regulations
including, but not limited to, FAA Advisory Circular
150/5200-33B, Hazardous Wildlife Attractants On or Near Airports and Advisory Circular 150/5200-34A,
Construction or Establishment of Landfills near Public
Airports.
Project applicant City of Lincoln Prior to approval of
improvement plans
Incorporate avoidance features
into design, consistent with FAA
rules and regulations including
Noise
MM-NOI-1 Noise Barriers. The applicant shall install
additional sound barriers (i.e., noise wall, berm or a
combination of these) and/or modifications to already-
proposed sound barriers, as shown in Figure 4.1102 and
described as follows:
a) At the southwestern-most proposed residential lot
(Receiver 24, Lot 177), a minimum 6-foot high,
solid noise barrier shall be constructed along the
southern lot line, so as to shield the private
exterior rear and side yards. Additionally, the
planned wall to the west of Receiver 24 (between
the project’s commercial land uses and the
residential uses) should be constructed to a
minimum 8 foot height from Lot 177 to Lot 182, at
which point the height may be 6 feet.
b) At the proposed park site along the
southeastern edge of the project site (Receiver
31), the planned noise barrier should be 12 feet
in height along the length of the park frontage
with SR 65, at which point the wall height may
then transition to 10 feet a nd then 8 feet.
Project applicant City of Lincoln Prior to issuance of
certificate of occupancy
permit
Installation of sound barriers
MM-NOI-2 Commercial Uses. During design review for
the proposed project, the applicant shall demonstrate that outdoor areas associated with residential units will be Project applicant City of Lincoln Prior to approval of
improvement plans
Demonstration that outdoor
areas associated with residential
408
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-33
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
protected from noise by one or a combination of the
following and/or equally effective measures:
a) Mechanical equipment associated with the
commercial uses shall be shielded from view of
adjacent residential uses by building parapets
or located within mechanical equipment rooms,
AND/OR
b) Commercial loading docks located within 300
feet of existing or proposed residences shall be
positioned in areas shielded from view of those
residences by intervening commercial
buildings, AND/OR
c) Solid noise barrier shall be constructed at the
boundary of the commercial uses of sufficient
height to intercept line of sight between heavy
trucks and the affected area of the residential
use, AND/OR
d) Truck deliveries shall be limited to daytime
hours (7 a.m.–10 p.m.) AND/OR
e) Signs shall be posted prohibiting Idling of
delivery trucks to 10 minutes or less.
units will be protected from
noise
MM-NOI-3 Recreational Uses. One or a combination of
the following shall be used to minimize the effects of outdoor noise on nearby residences during evenings and nighttime:
• Any outdoor activity areas, such as sports fields
or an amphitheater that seat large numbers of
spectators and/or include mechanical
amplification shall be sited and oriented away
from residential areas, and shall be designed
so that residential areas are shielded from
noise from these sources; AND/OR
• Loudspeakers and other forms of amplification
shall not be used in outdoor activity areas after
10 p.m.; AND/OR
Project applicant
City of Lincoln Prior to the issuance of
certificate of occupancy
Minimization of outdoor noise
409
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-34
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
• The City shall place a nuisance easement over
residential lots in the vicinity of the proposed
park.
MM-NOI-4 Construction Activity Limits.
a) Construction activity occurring within 500 feet
of occupied residential or other NSLU shall be
restricted to the hours between 7 a.m. to 7
p.m., Monday through Friday (unless extended
by special permit).
b) All internal combustion engines associated with
stationary and mobile construction equipment
shall have mufflers/silencers in good working
condition equal to or better than those supplied
with the equipment by
the manufacturer.
c) On-site construction staging and equipment
and material laydown areas shall be located as
far as practical from existing residential areas.
Project applicant and
contractor
City of Lincoln During construction Restriction of Construction Activity
Recreation
MM-REC-1 The Project Applicant shall pay in-lieu fees
for the construction of parks and recreational facilities in the vicinity of the proposed project. These fees shall be determined according to the City of Lincoln Municipal
Code Chapter 17.32, after considering park and open
space facilities to be constructed on the project site. The fee amount shall be based upon the fair market value of the outstanding acreage of dedicated park land required by Municipal Code Section 17.32.040, according to the
increase in population generated by the proposed project.
The fair market value shall be determined at the time of filing the tentative map or parcel map.
Project applicant City of Lincoln Prior to issuance of
building permits
Payment of in-lieu fees
Traffic and Circulation
MM-TRA-1 Project applicant shall contribute to the
installation of a traffic signal at the intersection of Nicolaus Road and Nelson Lane/Aviation Boulevard. These
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
410
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-35
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
improvements are included in the proposed update to the City’s PFE fee program. If the PFE program is adopted
prior to the issuance of building permits, the PFE payment will satisfy this requirement. If the PFE update is not adopted prior to the issuance of building permits, the City may require the project applicants to construct the
improvements and pay the project’s fair share of the
intersection improvement cost. The City would provide the project applicant with a right of reimbursement from third parties who also benefit from the improvements.
• If not, construction of the
improvements and pay the
project’s fair share of the
intersection improvement
cost while receiving a right of
reimbursement
MM-TRA-2 Project applicant shall contribute to the
provision of separate northbound and southbound right
turn lanes at the intersection of Joiner Parkway and First Street. These improvements are included in the proposed update to the City’s PFE fee program. If the PFE program is adopted prior to the issuance of building permits, the PFE payment will satisfy this requirement. If the PFE
update is not adopted prior to the issuance of building permits, the project applicant shall pay the project’s fair share of the improvement costs.
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
• If not, construction of the
improvements and pay the
project’s fair share of the
intersection improvement
cost while receiving a right of
reimbursement
MM-TRA-2 Project applicant shall contribute to the provision of separate northbound and southbound right turn lanes at the intersection of Joiner Parkway and First Street. These improvements are included in the proposed update to the City’s PFE fee program. If the PFE program is adopted prior to the issuance of building permits, the PFE payment will satisfy this requirement. If the PFE update is not adopted prior to the issuance of building permits, the project applicant shall pay the project’s fair share of the improvement costs.
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
• If not, construction of the
improvements and pay the
project’s fair share of the
intersection improvement
cost while receiving a right of
reimbursement
MM-TRA-3 Project applicant shall contribute toward the
provision of a protected eastbound right turn movement
at the intersection of Joiner Parkway and Nicolaus Road.
These improvements are included in the proposed
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
• If not, construction of the
improvements and pay the
411
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-36
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
update to the City’s PFE fee program. If the PFE program is adopted prior to the issuance of building permits, the PFE payment will satisfy this requirement. If the PFE
update is not adopted prior to the issuance of building permits, the project applicant shall pay the project’s fair share of the improvement costs.
project’s fair share of the
intersection improvement
cost while receiving a right of
reimbursement
MM-TRA-4 Project applicant shall contribute toward the
construction of a grade-separated interchange to replace the current intersection of Nelson Lane and State Route
65. These improvements are included in the proposed
update to the City’s PFE fee program. If the PFE program is adopted prior to the issuance of building permits, the PFE payment will satisfy this requirement. If the PFE
update is not adopted prior to the issuance of building permits, the project applicant shall pay the project’s fair share of the improvement costs.
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
• If not, construction of the
improvements and pay the
project’s fair share of the
intersection improvement
cost while receiving a right of
reimbursement
MM-TRA-5 Project applicant shall contribute toward the
provision of a channelized protected eastbound right turn movement at the intersection of State Route 65
southbound ramps and Ferrari Ranch Road. These
improvements are included in the proposed update to the City’s PFE fee program. If the PFE program is adopted
prior to the issuance of building permits, the PFE
payment will satisfy this requirement. If the PFE update is not adopted prior to the issuance of building permits, the project applicant shall pay the project’s fair share of the improvement costs.
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
• If not, construction of the
improvements and pay the
project’s fair share of the
intersection improvement
cost while receiving a right of
reimbursement
MM-TRA-6 Project applicant shall contribute toward
improvements to the Twelve Bridges Northbound Off-
Ramp. The PFE program includes restriping the
northbound off-ramp converting the existing shared
through-right turn lane to a shared through-left turn lane.
Project applicant City of Lincoln Prior to recordation of the Final Map
• Payment of contribution if the
PFE program is adopted
• If not, construction of the
improvements and pay the
project’s fair share of the
412
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-37
Mitigation Measure Implementation Monitoring Timing
Performance Evaluation
Criteria
If the PFE program is adopted prior to the issuance of
building permits, the PFE payment will satisfy this
requirement. If the PFE update is not adopted prior to the issuance of building permits, the project applicant shall pay the project’s fair share of the improvement costs.
intersection improvement
cost while receiving a right of
reimbursement
413
MITIGATION MONITORING AND REPORTING PROGRAM
Special Use District B (SUD-B) Northeast Quadrant Specific Plan Final EIR 8451 February 2019 L-38
INTENTIONALLY LEFT BLANK
414
Ordinance No.
ORDINANCE XXXX
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LINCOLN APPROVING A
ZONE TEXT AMENDMENT TO THE ADOPTED SUD-B NEQ GENERAL DEVELOPMENT PLAN (CITY COUNCIL RESOLUTION NO. 2019-099)
WHEREAS, the City of Lincoln adopted Ordinance No. 988B on May 28, 2019 approving the Special Use District -B Northeast Quadrant (SUD -B NEQ) General Development Plan (GDP); and
WHEREAS, Title 18, Chapter 18.32 of the Lincoln Municipal Code provides for the review of the City’s Planning Commission on all Specific Devel opment Plans and Development Permits (Design Review); and
WHEREAS, the City of Lincoln has received a request to amend the Special Use District-B Northeast Quadrant General Development Plan in conjunction with entitlements requested for the West Lincoln S quare Commercial Project (Project). The amendment involves a text change to the Permitted Uses Table 2.1 on page 2 -4 of the SUD B NEQ GDP which requires an entitlement (Conditional Use Permit) for an oil change facility; and WHEREAS, the City of Lincoln Ci ty Council adopted Resolution No. 2019 -098 on May 14, 2019, making findings concerning mitigation measures and alternatives, making a statement of overriding considerations, adopting a Mitigation Monitoring and Reporting Program, and certifying the Special Use District -B Northeast Quadrant Specific Plan Environmental Impact Report (EIR) (SCH # 2015032102) pursuant to the California Environmental Quality Act (CEQA); and
WHEREAS, the City, as a Lead Agency, has prepared an Addendum to the SUD-B NEQ Specific P lan EIR certified on May 14, 2019 (SCH # 2015032102), and has concluded the preparation of an additional supplemental or subsequent EIR is not required prior to approval of the proposed; and
WHEREAS, the Planning Commission of the City of Lincoln did hold a duly noticed public hearing and following discussion and public testimony on March 18, 2026, vote d to recommend the City of Lincoln City Council determine the Project would not result in any new significant environmental effects or substantial increases in the severity of significant effects previously identified in the EIR; and
WHEREAS, the Planning Commission of the City of Lincoln did hold a duly noticed public hearing and following discussion and public testimony and did on March 18, 2026 vote to recommend the City Council amend the SUD B General Development Plan; and WHEREAS, a notice describing the proposed West Lincoln Square Commercial Project in the SUD -B NEQ Specific Plan area was placed in the Lincoln News Messenger and were sent to neighboring property owners pursuant to Section 18.80.30 of the Lincoln Municipal Code.
415
Ordinance No.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF LINCOLN does ordain as follows:
Section 1 . Incorporation of Recitals. The City Council hereby incorporates by reference the recitals set forth above.
Section 2. CEQA Analysis. This Ordinance will not cause any environmental damage or substantially and avoidably injure fish or wildlife or their habitat because all potential impacts related to the environment have been mitigated as set forth in the Final Environmental Impact Report for the SUD -B NEQ Specific Plan, processed under SCH No. 2015032102 as documented in the SUD -B Northeast Quadrant Specific Plan Environmental Impact Report Addendum consistent with State CEQA Guideline s Section 5164 (Addendum to an EIR or Negative Declaration).
Section 3. Severability. If any section, sub -section, sentence, clause, phrase or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the Ordinance. City Council hereby declares that it would have adopted the Ordinance and each section, sub-section, sentence, clause, phrase or portion th ereof, irrespective of the fact that any one or more sections, sub -sections, sentences, clauses, phrases or portions to be declared invalid or unconstitutional.
Section 4. Publication. Within fifteen days of passage of this Ordinance, the City Clerk sha ll cause the full text of the Ordinance, with the names of those City Councilmembers voting for and against the Ordinance, to be published in the Lincoln News Messenger. In lieu of publishing the full text of the Ordinance, the City Clerk, if so directed b y the City Attorney and within fifteen days, shall cause a summary of the Ordinance, prepared by the City Attorney and with the names of the City Councilmembers voting for and against the Ordinance, to be published in the Lincoln News Messenger, and shall post in the office of the City Clerk a certified copy of the City Councilmembers voting for and against the Ordinance. The publication of a summary of the Ordinance in lieu of the full text of the Ordinance is authorized only where the requirements of Government Code § 36933(c)(1) are met.
Section 6. Text Amendment . Table 2.1 (Exhibit A) of the Special Use District -B Northeast Quadrant General Development Plan is modified as follows:
stations, Smog Centers, no including major repair or overall is changed from “Prohibited Use” to “Conditional Use Permit Required” for commercial zone only.
INTRODUCED at a regular meeting of the City Council of the City of Lincoln held on April 28, 2026, by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
416
Ordinance No.
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
_____
Richard Pearl, Mayor
ATTEST:
Hope Ithurburn, City Clerk
417
SUD-B Northeast Quadrant General Development Plan
SUD-B NEQ
General Development Plan
2 | Development
Regulations
and Standards
2-4
P = Permitted by Right
C = Conditional Use Permit Required
X = Prohibited Use
Zoning Categories
RESIDENTIAL ZONE COMMERCIAL ZONE PUBLIC/OPEN
SPACE ZONES
Land Uses LDR COMM PARK OS
Schools, K-12, private C X X X
Schools, K-12, public C X X X
Schools, vocational X X X X
Office and Health Care Uses
Business and professional offices X P X X
Hospitals X X X X
Medical and dental offices X P X X
Research and development; provided,
however, that such uses must occur
entirely within an enclosed building
X P X X
Indoor veterinary clinics and animal
hospitals X P X X
Outdoor veterinary clinics and animal
hospitals X C X X
Commercial Uses
Apparel and jewelry stores X P X X
Alcohol Sales (greater than 10k sf) X P X X
Automobile body, paint, maintenance
and/or repair shops (w/ dealership) X P X X
Automobile parts stores, retail only X P X X
Automobile and motorcycle sales and
rentals X P X X
Automobile service stations, Smog
Centers, not including major repair or
overhaul
X X X X
Bakeries and delicatessens X P X X
Bars, taverns and cocktail lounges X C X X
Barber shops, beauty, nail and tanning
salons and similar uses X P X X
418
Resolution No. 2026-XXX
RESOLUTION 2026-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINCOLN
APPROVING AN AMENDMENT TO THE COMMERCIAL PORTION OF THE APPROVED
A&P LINCOLN, LLC (PERRY-ARRILLAGA) PROPERTY LARGE TENTATIVE PARCEL MAP TO SUBDIVIDE APPROXIMATELY 40-ACRES INTO 22 COMMERCIAL PARCELS AND ANCILLARY PARCELS, LOCATED AT THE NORTHEAST CORNER OF HIGHWAY 65 AND NELSON LANE. APN: 021-262-044-000 (PLN25-00026) APPLICANT/OWNER: LINCOLN 100, LLC
WHEREAS, the City of Lincoln received an application for the West Lincoln Square Commercial Center project, which includes: (1) an amendment to the commercial portion of the original approved Peery/Arrillaga Large Lot Tentative Subdivision Map Large Lot (City Council Resolution No. 2019 -104) for the subdivision (West Lincoln Square Com mercial Tentative Parcel Map) of the 40-acre parcel into a total of 22 commercial and ancillary parcels; and WHEREAS, Tittle 17, Chapter 17.04 et seq. of the Lincoln Municipal Code provides for the review and recommendations of the City’s Planning Commission on all Tentative Maps; and WHEREAS, notices describing the proposed Tentative Parcel Map for the West Lincoln Square Commercial Project were sent to neighboring property owners pursuant to the Lincoln Municipal Code Section 17.16.150 and notice of the hearing was published in accordance with Section 6061 of the Government Code in at least one newspaper of general circulation within the City of Lincoln at least twenty calendar days before the Planning Commission’s public hearing; and
WHEREAS, the City of Lincoln duly noticed and held a public hearing for the Planning Commission to consider the proposed West Lincoln Square Commercial Project requests and consider the Special Use District B Northeast Quadrant Specific Plan Environmental Impact Report Addendum on March 18, 2026.
NOW THEREFORE BE IT RESOLVED:
Section 1.
This Resolution incorporates, and by this reference makes a part hereof, that the amendment to the commercial portion of the original approved Peery/Arrillaga Large Lot Tentative Subdivision Map Large Lot (City Council Resolution No. 2019 -104) is being heard pursuant to Title 17 (Subdivisions) of the Lincoln Municipal Code regulating Subdivisions and the Special Use District-B Northeast Quadrant (SUD -B NEQ) General Development Plan (GDP). The amendment will create a new commercial tentative parcel map that will subdivide a property (APN: 021-262-044-000) of approximately 40 acres into 22 commercial parcels of various sizes ranging from approximatel y 0.24 -acres to 16.33-acres. As proposed the te ntative parcel map complies with Lincoln Municipal Code Section 17.20 – Parcel Maps and the SUD -B NEQ GDP.
The proposed parcels anticipate inclusion of existing improvements with access off Nelson Lane and Oakbrook Drive. Connection to existing public util ities (e.g. water, sewer, etc.) would be from these frontage streets.
Section 2. Tentative Parcel Map Findings
419
Resolution No. 2026-XXX
Pursuant to Section 66474 of the Subdivision Map Act, the City Council hereby finds and determines as follows:
a. The Commercial Tentative Parcel Map is consistent with the General Plan because the map provides for the subdivision of the property to allow for development in accordance with the General Plan Land Use designations and the policies of the SUD-B NEQ Specific Plan and SUD-B NEQ GDP.
b. The design or improvement of the proposed project is consistent with the General Plan because adequate infrastructure and services are currently in the direct frontage of the property and will be available to serve the demand for services generated by the par cel map, including water, sanitary sewer, storm drain facilities and roadways. c. The site is physically suitable for the proposed Commercial Tentative Parcel Map because the Project is planned to respect and enhance the site’s natural form and environmental attributes and the proposed Project is designed to avoid areas of potential geologic instability, sensitive vegetation and wildlife resources, and significant cultural resources. The Project does not include plans to construct any buildings on or adjacent to unstable slopes.
d. The site is physically suitable for the proposed commercial development. e. The design of the Commercial Tentative Parcel Map will not cause any environmental damage or substantially and avoidably injure fish or wildlife or their habitat b ecause all potential impacts related to the environment have been mitigated as set forth in the Final Environmental Impact Report for the SUD-B NEQ Specific Plan, processed under SCH No. 2015032102 as documented in the SUD-B Northeast Quadrant Specific Pla n Environmental Impact Report Addendum consistent with State CEQA Guidelines Section 5164 (Addendum to an EIR or Negative Declaration).
f. The design of the Project or type of improvements is not likely to cause serious public health problems since water, sew er, police, fire and solid waste services will be adequately provided to the Project.
g. The design of the Project or the type of improvements will not conflict with easements, acquired by the public at large, or access through or use of, property within the proposed project.
Section 3.
The Tentative Parcel Map for the West Lincoln Square Commercial Project (Exhibit C) is subject to the conditions set forth in Exhibit A, attached hereto and incorporated by this reference.
These conditions support the findings made by the Planning Commission set forth herein.
Section 4.
Based on the findings set forth in this Resolution and the evidence in the Staff Report, the Planning Commission hereby recommends to the City Council that the Tentative Parcel Map for the West Lincoln Square Commercial Project be approved, substantially in the form on file with the Community Development Director, subject to the attached exhibits 420
Resolution No. 2026-XXX
PASSED AND ADOPTED this 28th day of April, 2026 by the following roll call vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
___________________________
Richard Pearl, Mayor
ATTEST:
Hope Ithurburn, City Clerk
421
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
West Lincoln Square Commercial Center Project
The West Lincoln Square Commercial Center Project, located within the Special Use District B Northeast Quadrant (SUD-B NEQ) Specific Plan Area in the City of Lincoln (Assessor's Parcel Number 021-262-044) is approved subject to the following conditions of approval:
* (Single Asterisk) located in front of the Condition is a Modified Standard Condition ** (Double Asterisk) located in front indicates a New Condition Specific to the West Lincoln Square Commercial Center Project
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
General Conditions
1. All development within the Special Use District B Northeast Quadrant (SUD-B NEQ} Specific Plan Area is subject to compliance with Mitigation Measures contained within the SUD-B NEQ EIR (State Clearinghouse No. 20150422008}.
General Condition Community
Development
2. The Applicant shall hold harmless the City, its Council Members, its Planning Commission, officers, agents, employees, and representatives from liability for any award, damages, costs and fees incurred by the City and/or awarded to any plaintiff in an acti on challenging the validity of this permit or any environmental or other documentation related to approval of this permit. Applicant further agrees to provide a defense for the City in any such action.
General Condition Community
Development
3. The Applicant shall pay the City's actual costs of providing entitlement processing Plan review, Final Map review, GIS, administrative fee, and inspection services. This may be a combination of staff costs and direct billing for contract professional servi ces.
General Condition City of Lincoln
4. All improvements required for the Peery Amended (West Lincoln Square) Tentative Commercial Parcel Map shall be designed and constructed to conform to the City of Lincoln Municipal Code, Section 17, Design Criteria and Procedures Manual and Public Facilities Improvement Standards or as modified by these Conditions of Approval, or as approved by the City Engineer and/or Community Development Director.
General Condition Development
Engineering
and City
Engineer
422
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
5. **If there is a conflict between the Project Development Agreement and the Conditions of Approval, the Development Agreement shall prevail.
In case of any conflicts between these conditions of approval and the previously approved Conditions of approval under Resolutions 2019-104 & 105 arise, the Applicant/Owner shall cooperatively work on a resolution with the City of Lincoln within the provisions of the approved SUD-B Specific Plan, Infrastructure Financing Plan & the Peery Developer Agreement
General Condition Community
Development
and City
Engineer
6. As set forth in the City's Public Facilities Element Fee (PFE program), the project is subject to Infrastructure and Capital Facility Impact Fees categories including but not limited to, Wastewater Fee; Reclaimed or Raw Water Fee; Drainage Fee; Water Fee; Transportation Fee; and Community Services Fees which includes Parks, City Administration, Fire, Police, Solid Waste, and Library.
General Condition Support
Services
7. * The Peery Amended (West Lincoln Square) Tentative Commercial Parcel Map shall be subject to those provisions set forth in the approved SUD-B NEQ Specific Plan (adopted by Resolution No. 2019-100, dated May 14, 2019), the SUD-B NEQ General Development Plan (adopted by Ordinance No. 988B), the A&P Lincoln, LLC (Peery-Arrillaga) Property Development Agreement (adopted by Ordinance No. 989B), and as may be subsequently amended
General Condition Community
Development
8. The Peery Amended (West Lincoln Square) Tentative Commercial Parcel Map approval is valid for two (2) years from the date of City Council approval, unless an extension of time is subsequently approved per Government Code Section 66452.G(e), or extended by the terms of a Development Agreement.
General Condition City of Lincoln
423
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
9. All improvements and construction within the project shall be consistent with the approved Peery Amended (West Lincoln Square) Tentative Commercial Parcel Map and consistent with the previously approved Peery Property Large Lot Tentative Map and Small Lot Tentative Map under City Council Resolutions 2019-104 & 105.
General Condition Community
Development
10. The ability to proceed under any approvals, entitlements, or authorizations granted by this action, including the recordation of Final Map, are contingent upon compliance with the terms and conditions of the Annexation Process from Placer County, the SUD -B NEQ Specific Plan, the General Development Plan, and the A&P Lincoln LLC (Peery - Arrillaga) Property Development Agreement.
General Condition Community
Development
11. Prior to City Council approval of any Final Maps in the project area, the installation timing of specific offsite improvements associated with the project shall have been established to the satisfaction of the City Engineer.
General Condition Development
Engineering
and City
Engineer
Final Map
12. Applicant/Owner shall design and construct all proposed frontage backbone public improvements, if not constructed by others, to include traffic signals along Nelson Road and Oakbrook Dr, offsite and onsite public water, sewer and lift station facilities as noted on the approved Peery Amended (West Lincoln Square) Tentative Commercial Parcel Map to the satisfaction of the City Engineer.
Prior to any building
Occupancy
Development
Engineering
and City
Engineer
424
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
13. Prior to the approval of each Final Parcel Map, the Developer shall enter into a standard City Frontage Agreement with the City identifying the public improvements, as noted on the approved tentative parcel map, to be constructed. The Developer shall provide security, in one of the standard forms acceptable to the City Attorney and consistent with the Subdivision Map Act guaranteeing construction of the improvements. The City may accept proceeds from any bond sale for security in the manner authorized by Government Code Sections 66462(a)(2)(b) and 66499.5.
Prior to each Final
Parcel Map approval
Community
Development
and City
Engineer
14. Arrangements shall be made by the Subdivider during the review of Final Parcel Map by the City for the abandonment of any existing easements and/or right-of-way no longer required as well as arrangements for the dedication of new easements and/or rights -or-way required to carry out project conditions of approval. Separate document easements required by the City shall be prepared by a licensed land surveyor and submitted for review by the City Surveyor, Community Development Department and City Engineer.
Prior to Final Parcel
Map approval
Community
Development
and City
Engineer
15. ** Commercial frontage landscaping along Nelson Lane & Oakbrook Drive shall be privately maintained, and any existing public landscape easement shall be abandoned.
Concurrent with/prior
to the first Final
Parcel Map Approval
Development
Engineering
and City
Engineer
16. The Landowner shall convey all groundwater rights to the City of Lincoln with the recordation of any Final Maps.
Prior to recordation
of Final Parcel Map
approval
Community
Development
and City
Engineer
425
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
17. A Specific Development Plan (Master Plan) and Development Permit is required for development of the parcels created by the tentative parcel map.
General Condition Community
Development
18. Approval of this tentative parcel map does not constitute approval of proposed improvements as to size, design, materials, or location, unless specifically addressed in these conditions of approval.
General Condition City of Lincoln
19. **The Owner shall design, build and dedicate public utility easements for sewer, water, and the lift station of a size established by City Standards and Specifications and consistent with the approved tentative parcel map.
b. ** The owner shall dedicate a blanket access easement over the mapped area for maintenance of water, sewer appurtenances as well as for fire & public safety purposes to the satisfaction of the Community Development Director. c. Private utility easements over utility pipes being shared between parcels may be required.
Prior to Final Parcel
Map approval
Community
Development
and City
Engineer
20. Applicant/Owner shall prepare legal descriptions and plats for submission for all dedications required along with the necessary deposit for technical reviews by the City Surveyor , if not offered on the parcel map.
Concurrently with
the Final Parcel Map
approval
Community
Development
and City
Engineer
426
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
21. **The Owner shall convey LOT-E as a public sewer lift station lot. Concurrently with the Final Parcel Map
approval
Community
Development
and City
Engineer
22. The words "traffic control appurtenances" shall be included on the cover sheet of Final Map in the list of utilities allowed in public utility easements (PUE's) located along public roads.
Prior to Final Parcel
Map approval
Development
Engineering
City Engineer
23. a. The Owner/Developer shall record all easements and reciprocal use agreements between parcels for construction, use, and maintenance of any shared private infrastructure, reciprocal storm drainage maintenance areas, common drives, or landscaping.
b. A draft shall be submitted for City of Lincoln legal review prior to recordation.
Concurrently with
each final Parcel
Map Approval
Community
Development
24. The project shall provide a reciprocal parking, access and maintenance agreement to provide for cross-parcel circulation between all parcels for legal review & approval.
Prior to each Final
Parcel Map Approval
Development
Engineering &
City Engineer
427
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
25. A note shall be placed on the final Parcel Map as follows: “A grading permit shall be required prior to any work on any parcel.”
Prior to final Parcel
Map Approval
Community
Development
26. A note shall be placed on the final Parcel Map as follows: “No building is proposed with this minor subdivision. Development of the parcels is subject to the Lincoln Municipal Code and those provisions set forth in the approved SUD-B Specific Plan, General Development Plan and Development Standards for the Plan Area”.
Prior to final Parcel
Map Approval
Community
Development
27. The Applicant shall provide to the Community Development Department copies of the Final Parcel Map after the City Engineer's approval but prior to City Council approval:
Two digital copies of the Final Map in DWG format compatible with the City's mapping and PDF
One plot or print of the submittal
Prior to Final Map
approval
Community
Development
and City
Engineer
28. Prior to recordation of a final parcel map, the Subdivider shall file with the Placer County Clerk, a certificate from the Placer County Tax Collector's Office indicating that no liens against the subdivision or any part thereof exist for unpaid State, County, Municipal or local taxes or special assessments collected with taxes, except those not yet due and payable.
Prior to Final Parcel
Map Approval
Development
Engineering
and City
Engineer
428
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
29. After recording the Final Map, the Developer shall provide to the City Engineer one copy of the recorded Final Map on Mylar to the satisfaction of the City Engineer.
Immediately after
recordation of Final
Parcel Map
Community
Development
and City
Engineer
30. If not dedicated with the peery Phase 2 residential final map, the subdivider shall dedicate easements(IOD) for public street & highway purposes for Oakbrook Drive and Nelson Lane and dedicate all public service easements for future public improvements r equired to serve the lots as shown on the approved tentative parcel map dated Feb. 11, 2026, to the satisfaction of the City Engineer. Development of the parcels shown on the parcel map may require additional approvals from the City.
Concurrent with
filing the Final Parcel
Map with the City
Council
Development
Engineering,
City Engineer
31. The Owner shall establish a funding mechanism for the ongoing maintenance and operations of localized landscaping, parks, stormwater, street, and streetlighting facilities associated with the project that will fall under City maintenance responsibility, an d the project’s share of ongoing maintenance and operations corresponding to Citywide facilities.
This funding mechanism may consist of a Special Tax, Community Facilities District (CFD), or endowment, at the City’s discretion. All costs associated with meeting this condition shall be paid by the Owner, and compliance with this condition shall be to the satisfaction of the City Engineer. Annual maintenance and operations costs will be assigned proportionately to the project parcel(s) and annual adjustments may be applied based on the annual change in the Consumer Price Index (CPI) plus 3% or another escalator to keep up with inflationary increases in maintenance costs as determined by the City. Annexation into a maintenance CFD, such as the City’s CFD No. 2018-1, will satisfy this requirement.
Prior to Final Parcel
Map Approval
Community
Development,
Finance
Manager & City
Engineer
429
Exhibit A
West Lincoln Square Commercial Center Conditions of Approval
Amendments to the commercial portion of the Approved COAs from A&P Lincoln, LLC (Peery-Arrillaga) Property Tentative Parcel Map
Condition Timing Responsible
Party Status
32. The Development Agreement shall address the obligation of the Developer to reimburse for facilities constructed by third parties which benefit the Developer, if any.
Prior to Recordation
of Final Map
Community
Development
END
430
431
432
433
434
435
SUBJECT:
Adopt a Resolution A
pproving the Pre-Annexation Proceedings
for the Brar Property and Determine that No Further
Environmental Analysis is Needed Under CEQA
. (Rommel
Pabalinas)
SUBMITTED BY:
Rommel Pabalinas
DEPARTMENT:
Community Development
DATE:
April 28, 2026
Item Number 14.C
STAFF RECOMMENDATION:
Pre-Annexation proceedings authorizing formal filing of an application for annexation with Placer County LAFCo of a 115-acre property within the unincorporated portion of the Village 5 Specific Plan area (PLN25-00031; Applicant/Owner: Brar Ventures Inc./SSB Holding, LLC; Assessor’s Parcel Number 021-263-016-000)
Staff recommends the City Council conduct a public hearing, consider the information contained in the staff report, recommendation by the Planning Commission, testimony of the public, and take the following actions:
1 .
Determine that the project is exempt from the California Environmental Quality Act (CEQA) under CEQA Section 15183, whereby projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified will not result in any new significant environmental effects or substantial increases in the severity of significant effects previously identified in the certified Final EIR for the Village 5 Specific Plan (SCH No. 2014-052071). Therefore, no further analysis is required under CEQA.
2 .
Adopt a Resolution approving the Pre-Annexation proceedings for the Brar Property and authorizing the City Manager to formally file an application for the annexation of Assessor’s Parcel Number 021-263-016-000 with Placer County LAFCo.
STRATEGIC
RELEVANCE:
Economic Development/Housing Supply
Annexation of the 115-acre property would result in the reduction of the unincorporated “Island B” areas within Village 5 Specific Plan area and opportunity for development in support of the goals, objectives and policies of the specific plan and City of Lincoln General Plan 2050.
STAFF REPORT
436
BACKGROUND/INTRODUCTION:
Planning Commission Action
On March 18, 2026, the Planning Commission conducted a hearing in consideration of the proposed Brar Property Pre-Annexation proceedings
[1]
. As further detailed in the Planning
Commission agenda packet, the Brar Property encompass approximately 115-acre in size within the unincorporated “Island B” area of Village 5 Specific Plan (Attachment 1). No development is proposed with this application; however, if formally approved for annexation into the city, development of the site would occur in conformance with the applicable requirements of the Village 5 Specific Plan and General Development Plan Following staff presentation of the project, written and verbal public comments were received and considered by the Planning Commission
[2]
[3]
. Staff responded to these comments,
which include concerns about potential development impacts to existing agricultural uses, development traffic impacts to County roads, and public hearing notification requirements.
Following deliberation, the Planning Commission considered staff recommendations, voting in support of the project and forwarding to City Council for final actions. [1]
March 18th Planning Commission Staff Report for Brar Property Pre-Annexation Proceedings
[2]
March 18th Planning Commission Minutes
[3]
March 18th Planning Commission video
FINDINGS/ANALYSIS:
Consideration of the pre-annexation of the Brar property provides an opportunity to implement various development and economic goals and objectives of the Village 5 Specific Plan. Firstly, annexation of the 115-acre property would promptly fill in approximately 15% of the unincorporated area of Island B. Coupled with other unincorporated properties within the Village 7 Specific Plan area currently contemplating development and annexation, annexation of the Brar property may spur additional interest from other Island B properties to annex and/or develop, further filling-in the unincorporated island. This potential interest may be more relevant as on-going development in Liberty at Lincoln and pre-development planning of Village 5A by Richland Communities continues further expanding and extending public infrastructures and services.
Secondly, as development of the site is regulated by the Village 5 GDP and restricted by Airport Compatibility Zones (City of Lincoln Airport), other potential uses alternative to residential development are available. Under the categories of Agritourism, Commercial and Recreational, uses such as tasting rooms, micro-brewery/distillery facilities, bed and breakfast inns, and parks may provide unique and flexible choices that also support, promote and further the objectives of the Village 5 Specific Plan.
Thirdly, following the successful annexations of SUD-B NEQ Specific Plan area in 2023 and Village 5A in 2025, documents necessary for the annexation application, including the adopted 437
Municipal Services Review (MSR) and respective Tax Share Agreements, are currently in effect and can be used for the efficient and streamlined processing of annexation of the Brar property. Preparation of these documents can be costly and involves abundant of staff time to process.
While the decision to consider annexation ultimately lies with the individual or group of property owners, the larger the area of Island B is successfully annexed, the more effective the City can coordinate and implement orderly growth and development within this portion of Village 5 Specific Plan area and the surrounding area through application of specific plan policy requirements and achieve the goals and objectives of the City of Lincoln General Plan.
ENVIRONMENTAL REVIEW:
Approval and authorization of the Brar property for annexation is exempt from the California Environmental Quality Act (CEQA) under Section 15183, whereby projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified will not result in any new significant environmental effects or substantial increases in the severity of significant effects previously identified in the certified Final EIR for the Village 5 Specific Plan (SCH No. 2014-052071).
Therefore, no further analysis is required under CEQA.
CONCLUSION
As supported in the analysis above and detailed in the Resolution, staff recommends the City Council consider the Planning Commission approval recommendation of the Brar Property Pre-Annexation proceedings and authorize the City Manager to formally file an application with Placer County LAFCo for the annexation of the 115-acre property the within adopted Village 5 Specific Plan into the City of Lincoln.
LEVINE ACT COMPLIANCE:
The Levine Act requires a party (or the party’s agent(s)) to a proceeding before the City of Lincoln that involves any action or consideration to their contract, license, permit, or other entitlement for use, to disclose any campaign contribution made to City elected or appointed officer totaling more than $500 within the 12 months before the City decision. The applicant submitted a Levine Act Statement to the City and cited no contributions to a City elected or appointed officer totaling more than $500 within the reporting period.
ATTACHMENTS:
RESOLUTION.docx
Attachment 1
Brar Property and Land Use Maps.pdf
438
Resolution No. 2026-XXX
RESOLUTION 2026 – XXXX
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINCOLN APPROVING THE
PREANNEXATION PROCEEDINGS FOR THE FORMAL FILING OF AN APPLICATION FOR ANNEXATION OF ASSESSOR’S PARCEL NUMBER (APN) 021-263-016 (BRAR
PROPERTY)
WHEREAS, the City Council adopted the 2050 General Plan under City Council Resolution No. 2008-048 on March 25, 2008; and
WHEREAS, the City Council adopted the Village 5 Specific Plan, consistent with the adopted 2050 General Plan on December 17, 2017; and WHEREAS, on September 13, 2023, Placer County Local Agency Formation Commission (LAFCo) approved the annexation of the Village 5 Specific Plan; and WHEREAS, on November 8, 2023, Placer County LAFCo formally terminated the approval of Village 5 Specific Plan annexation following a protest hearing; and WHEREAS, the City Council approved a portion of the Village 5 Specific Plan (Village 5A) for formal filing of an annexation application with LAFCo on May 31, 2024; and
WHEREAS, Village 5A maintains consistency with the scope and authority of the objectives and policies of the adopted Village 5 Specific Plan and environmental analysis and conclusion of the certified Environmental Impact Report (EIR) (SCH No.2014 - 052071); and
WHEREAS, on December 4, 2024, Placer County LAFCo conditionally approved the annexation of Village 5A which created two distinct “Island” areas that remained within and subject to Placer County jurisdiction; and
WHEREAS, Placer County LAFCo Executive Officer issued a Certificate of Completion on January 16, 2025, formalizing approval of Village 5A annexation; and WHEREAS, the applicant and property owner, Steve Brar, filed an application for a preannexation proceedings for the annexation of his 115 -acre property located within the Island B area of the Village 5 Specific Plan into the City of Lincoln; and WHEREAS, the annexation of the Brar Property would be subject to the scope and authority of the objectives and policies of the adopted Village 5 Specific Plan and environmental analysis and conclusion of the certified Environmental Impact Report (EIR) (SCH No.2014- 052071), thereby qualifying for an exemption under CEQA Section 15183 (Projects consistent with a Community Plan, General Plan); and 439
Resolution No. 2026-XXX
WHEREAS, the Planning Commission conducted a duly scheduled public hearing on March 18, 2026 in consideration of the Brar Property Pre-Annexation Proceedings and recommended approval to the City Council; and
WHEREAS, approval of the Pre-Annexation proceedings would authorize the City Manager formal annexation of said property in order to fulfill the goals and objectives of the Village 5 Specific Plan; and
WHEREAS, notices describing the proposed Brar Property Pre -Annexation proceedings and the time and place of the City Council hearing, including a general explanation of the matter to be considered was published in a newspaper of local circulation and sent to neighbori ng property owners pursuant to Section 18.92 of the Lincoln Municipal Code.
NOW THEREFORE BE IT RESOLVED:
Section 1. The foregoing recitals are true and correct and are hereby incorporated by reference.
Section 2. The pre-annexation proceedings of the Brar Property involves a property within a portion of the adopted Village 5 Specific Plan and will be contiguous to the existing City boundary and within the City’s Sphere of Influence.
Section 3. The pre-annexation proceedings of the Brar Property will remain consistent with and will be implemented in accordance with the adopted Village 5 Specific Plan and supporting documents.
Section 4. The City Council authorizes the City Manager to initiate application annexation with Placer County Local Agency Formation Commission (LAFCo) for the Brar Property.
PASSED AND ADOPTED this 28th day of April 2026, by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
___________________________
Richard Pearl, Mayor
ATTEST:
Hope Ithurburn, City Clerk
440
Location Map- Brar Property (in red dashes outline)
N
ATTACHMENT 1
441
Assessor’s Parcel Map- Brar Property (in red dashes outline)
442
Overview Map- Villages and Special Use District (SUD) Areas, Village 5 “Islands” Area, and Brar Property (in red dashes outline)
Island A
Island
B
Village 5A
N
443
Village 5 Specific Plan Land Use Map (Brar Property in red dashes outline)
444
SUBJECT:
Adopt a Resolution Authorizing the City Manager to
unencumber funds from CIPV2512 Autocar EV garbage
collection vehicle and reallocate for Procurement of Tymco 500X Street Sweeper and Chevrolet Silverado EV. (Aaron
Hookins)
SUBMITTED BY:
Mike Osborne
DEPARTMENT:
Public Works
DATE:
April 28, 2026
Item Number 15.A
STAFF RECOMMENDATION:
Staff recommends that the City Council adopt a resolution authorizing the City Manager to:
1 .
Unencumber $900,000 from CIPV2512;
2 .
Augment the Fiscal Year 2025–26 budget by $540,000 creating two new CIPs; and 3 .
Execute purchase orders in the amounts of $450,000 for the procurement of one Tymco 500X street sweeper (CIPV2534) and $70,000 for the procurement of one Chevrolet EV pickup (CIPV2535).
BACKGROUND/INTRODUCTION:
The Public Works budget for Fiscal Year 2026/27 includes an allocation of $900,000 for the purchase of an electric refuse collection vehicle. After careful evaluation, staff recommends deferring this purchase based on several considerations.
Available user feedback regarding the McNeilus Volterra indicates that the technology remains in a relatively early stage of development, with reported maintenance and reliability concerns exceeding those associated with conventional diesel-powered vehicles. In addition, staff has not identified any municipalities that have procured this specific model, limiting the availability of peer agency data and operational benchmarks.
Most significantly, California’s mandate requiring the city to increase from 50 percent to 100 percent zero-emission vehicle (ZEV) procurement has been postponed to start in 2030. This extension provides additional time for the technology to mature and for the market to stabilize, reducing the urgency of immediate adoption.
Street sweeping serves a critical role in municipal operations, providing both visible community benefits and essential environmental protection. In addition to improving neighborhood aesthetics and supporting public health, street sweeping is a key best management practice
STAFF REPORT
445
(BMP) for stormwater management and water quality protection. It is also a required component of several municipal programs, including Solid Waste, Stormwater, Water Quality, and Economic Development.
In the interim, the City faces an urgent operational need for a second Tymco 500X street sweeper. Increased sweeping demands have exceeded current capacity, and the absence of an additional high-dump unit is constraining operational efficiency.
The existing Tymco 500X significantly enhances operations by eliminating the need for repeated trips to disposal sites, as it can discharge debris directly into a roll-off container. By comparison, the City’s older sweepers are less efficient and have become increasingly impractical, requiring substantially more time to complete the same workload. The Tymco 500X is capable of completing equivalent work in less than half the time. Staff have evaluated alternative sweepers; however, none have demonstrated comparable performance or operational features.
FINDINGS/ANALYSIS:
In addition to lacking high-dump capability, the City’s existing sweepers are experiencing increasing reliability issues due to age and wear. Frequent mechanical failures—including hydraulic leaks and electrical malfunctions—have resulted in higher maintenance costs and operational disruptions. From a lifecycle perspective, these units are comparable to refuse collection vehicles, which typically become unreliable after seven to ten years of heavy use.
Similar to refuse trucks, street sweepers are complex, computer-controlled vehicles that operate in harsh, debris-laden environments, accelerating wear and contributing to declining reliability over time.
Given the operational advantages of the Tymco 500X street sweeper and the City’s increasing street sweeping demands, staff recommends that the City Council adopt a resolution authorizing the City Manager to (1) amend the Fiscal Year 2025–26 budget by $540,000 and (2) execute purchase orders in the amounts of $450,000 for the procurement of one Tymco 500X street sweeper and $70,000 for the procurement of one Chevrolet Silverado EV.
Pursuant to California’s Zero-Emission Vehicle (ZEV) purchase requirements under the Advanced Clean Fleets (ACF) regulation, the City must offset the acquisition of the proposed diesel-powered street sweeper with the purchase of a zero-emission vehicle. To satisfy this requirement, staff recommends the purchase of a Chevrolet Silverado EV for use by the Solid Waste Division. This recommendation reflects current market availability, as the Ford F-150 Lightning EV is no longer in production.
Consequently, this action would replace the previously proposed purchase of a McNeilus Volterra electric residential refuse collection vehicle. The recommended approach represents a strategic reallocation of resources to address an immediate and high-impact operational need while maintaining compliance with California’s Zero-Emission Vehicle (ZEV) requirements.
FISCAL IMPACT:
Funding for this equipment is included in the Fiscal Year 2026/27 budget under Fund 7310 (Solid Waste Capital), originally allocated for the purchase of an electric residential refuse collection vehicle (CIP V2512).
446
Budgeted (FY 2026/27):
CIP V2512 – EV Residential Garbage Truck
Fund 7310 – Solid Waste Capital: $900,000
Total:
$900,000
Staff recommends reprogramming a portion of these funds as follows:
Amount to be unencumbered from FY 2026/27: $900,000
Amount to be encumbered in FY 2025/26: $540,000
This reallocation results in a reduction of $360,000 to the adopted two-year FY 2025–27 budget in Fund 7310 Solid Waste Capital.
Estimated Project Costs (Fund 7310):
Tymco 500X Street Sweeper: $450,000
Chevrolet Silverado EV: $70,000
Contingency: $20,000
Total:
$540,000
ATTACHMENTS:
ATTACHMENT_A_Resolution.docx
ATTACHMENT B Cooperative Purchasing Quote for One Tymco 500x Sweeper.docx ATTACHMENT C Photo of Proposed Sweeper.docx
ATTACHMENT D Cooperative Purchasing Quote for One Chevrolet Silverado EV.docx ATTACHMENT E Representative Photo of Chevrolet Silverado EV.docx 447
Resolution No. 2026-XXX
RESOLUTION 2026-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINCOLN AUTHORIZING THE CITY MANAGER TO UNENCUMBER $900,000 FROM THE APPROVED 2025-2027 BUDGET, AUGMENT THE FY 2025–26 BUDGET BY $540,000 (INCLUDING CONTINGENCIES) AND EXECUTE PURCHASE ORDERS IN THE AMOUNT OF $450,000 FOR THE PROCUREMENT OF ONE TYMCO 500X STREET SWEEPER AND $70,000 FOR ONE CHEVROLET SILVERADO EV FOR USE BY THE SOLID WASTE DIVISION.
WHEREAS, the Public Works budget for 26/27 includes $900,000 that was proposed for the purchase of an electric garbage truck; and
WHEREAS, the date for the 100 percent zero emission vehicle requirement has been delayed to January 1, 2030 and this concession allows more flexibility in vehicle purchases; and
WHEREAS, Staff has decided against the EV garbage truck proposal in light of a number of factors; and
WHEREAS, it has become clear that there is an immediate need to purchase a second Tymco 500x sweeper because of both the increased sweeping needs of the city and the lack of a second sweeper with high-dump capability; and
WHEREAS, the time-consuming challenge of frequent trips to the dump for emptying is avoided by the currently owned Tymco 500x, which streamlines the process by dumping into a conveniently located trash bin; and
WHEREAS, in comparison with the Tymco 500x, the city’s older technology sweepers, in addition to their unreliability because of wear and tear, have been rendered impractical in light of the greatly increased efficiency of the new sweeper which requires less than half the time to do the same amount of work; and
WHEREAS, for purposes of comparison, Staff has test driven other sweepers, none of which match the features and performance of the Tymco 500x; and
WHEREAS, California’s ZEV Purchase Schedule requires the city to buy a zero-emission vehicle to balance out the purchase of the diesel-powered sweeper proposed here, staff recommends a Chevrolet Silverado EV for use by the Solid Waste Division to satisfy this requirement.
NOW THEREFORE BE IT RESOLVED that the City Council hereby authorizes the City Manager to unencumber $900,000 approved for the purchase of an 448
Resolution No. 2026-XXX
electric garbage collection vehicle, augment the FY 2025–26 budget by $540,000 and execute purchase orders for the procurement of one Tymco 500x street sweeper and one Chevrolet Silverado EV for use by the Solid Waste Division.
PASSED AND ADOPTED this 28th day of April, 2026 by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
Richard Pearl, Mayor
ATTEST:
Hope Ithurburn, City Clerk
449
Attachment B
Cooperative Purchasing Quote for a Tymco 500x Sweeper
450
451
Attachment C
Tymco 500x Sweeper
452
Attachment D
Cooperative Purchasing Quote for a Chevrolet Silverado EV
453
Attachment E
Representative Photo of Chevrolet Silverado EV
454
SUBJECT:
Adopt a Resolution Awarding the Contract for Professional Auditing Services to MUN CPAs LLP and Authorizing the City Manager, or Designee, to Enter into an Agreement for
Services. (Nita Wracker)
SUBMITTED BY:
Nita Wracker
DEPARTMENT:
Finance
DATE:
April 28, 2026
Item Number 15.B
STAFF RECOMMENDATION:
Adopt a Resolution authorizing the City Manager or designee to execute an agreement with MUN CPAs, LLP for financial auditing services for a five-year term for the fiscal years ending June 30, 2026 through June 30, 2030, with the City retaining the option to renew the agreement for up to three additional one-year terms.
BACKGROUND/INTRODUCTION:
The City issued a Request for Proposals for Financial Auditing Services to obtain qualified certified public accountant firms to audit the City’s financial statements for five fiscal years beginning with the fiscal year ending June 30, 2026, and to perform related audit and reporting services.
Proposals were due through PlanetBids on March 4, 2026, at 1:00 p.m. Pacific Time. The City received proposals from seven firms: MUN CPAs, LLP; Badawi & Associates; The Pun Group, LLP; Vasquez & Company, LLP; LSL, LLP; CliftonLarsonAllen LLP; and Harshwal & Company LLP. The proposals were evaluated by City finance professionals and the elected City Treasurer using the criteria identified in the Request for Proposals, including proposal completeness, comprehensiveness of services, public sector experience and references, strength and stability of the consultant, assigned relationship management team, and charges for services. The Request for Proposals also stated that the City’s final selection would not be dictated by any single factor, including price.
The Request for Proposals provided for a five-year contract term, with annual renewal options at the City’s discretion for up to three additional one-year terms.
FINDINGS/ANALYSIS:
Following review of the submitted proposals, MUN CPAs, LLP received the highest overall score with 280 points out of a possible 300. The other firms scored as follows: Badawi &
STAFF REPORT
455
Associates, 274; The Pun Group, LLP, 269; Vasquez & Company, LLP, 268; LSL, LLP, 264; CliftonLarsonAllen LLP, 255; and Harshwal & Company LLP, 239.
Staff recommends award to MUN CPAs, LLP based on its top-ranked proposal, extensive governmental auditing experience, and demonstrated ability to provide the full range of services requested by the City. In its proposal, MUN confirmed its understanding of the required scope, including the audit of the City, the Lincoln Public Financing Authority, and the Successor Agency; preparation of the Annual Comprehensive Financial Report; performance of Single Audit services when required; preparation of State Controller reports; and annual agreed-upon procedures related to the City’s Gann Appropriations Limit.
MUN CPAs has served as the City’s auditor since 2017, providing continuity and institutional knowledge that supports an efficient audit process and minimizes disruption to City operations.
MUN’s proposal also states that the firm has the depth and flexibility to rotate engagement partners and key personnel as needed, which allows the City to maintain continuity with the same audit firm while also ensuring periodic partner rotation and a fresh professional perspective.
MUN’s proposed engagement team includes Erica Pastor, CPA, as Engagement Partner; Justin Williams, CPA, as Concurring Partner; and Susan Beeter, CPA, as Senior Manager.
MUN also emphasized extensive partner involvement, consistent and experienced staff, proactive communication, and availability to provide technical guidance on applicable GASB implementation issues at no additional charge for routine consultations.
Based on the evaluation results and the firm’s qualifications, staff has determined that MUN CPAs, LLP is best qualified to continue providing financial auditing services in a manner that serves the City’s best interests.
FISCAL IMPACT:
MUN CPAs, LLP proposed the following all-inclusive maximum fees for the base five-year term:
Fiscal Year 2025/26: $79,300
Fiscal Year 2026/27: $81,300
Fiscal Year 2027/28: $83,300
Fiscal Year 2028/29: $85,400
Fiscal Year 2029/30: $87,500
These fees include the City audit and related reports, Gann Limit procedures and report, Single Audit and related reports, and State Controller reports. MUN’s fee schedule includes one major program under the Single Audit, with each additional major program priced at $2,500.
The first-year contract amount of $79,300 will be funded through the Finance Department’s professional services budget, or the appropriate budgeted account for audit services.
ATTACHMENTS:
456
Resolution_-_financial_audit_services.docx
MUN CPA's LLP contract with proposed MUN CPAs revisions.docx 457
Resolution No. 2026-XXX
RESOLUTION 2026-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINCOLN AWARDING AN AGREEMENT TO MUN CPAs, LLP FOR FINANCIAL AUDITING
SERVICES AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE
AGREEMENT
WHEREAS, the City of Lincoln issued a Request for Proposals for Financial Auditing Services to obtain qualified certified public accountant firms to audit the City’s financial statements and provide related audit and reporting services for the fiscal years ending June 30, 2026 through June 30, 2030; and
WHEREAS, the Request for Proposals provided for a five-year contract term, with annual renewal options at the City’s discretion for up to three additional one -year terms; and
WHEREAS, proposals were due on March 4 , 2026, and the City received proposals from seven firms; and
WHEREAS, the proposals were evaluated by City finance professionals and the elected City Treasurer using the criteria identified in the Request for Proposals, including proposal completeness, c omprehensiveness of services, public sector experience and references, strength and stability of the consultant, assigned relationship management team, and charges for services; and
WHEREAS, following evaluation of the submitted proposals, MUN CPAs, LLP received the highest overall score; and
WHEREAS, MUN CPAs, LLP has served as the City’s auditor since 2017, providing continuity and institutional knowledge that supports an efficient audit process and minimizes disruption to City operations; and
WHEREAS, MUN CPAs, LLP has also represented that the firm has the depth and flexibility to rotate engagement partners and key personnel as needed, which allows the City to maintain continuity with the same audit firm while also ensuring periodic partner rotation and a fresh professional perspective; and
WHEREAS, MUN CPAs, LLP confirmed its understanding of the City’s requested scope of services, including the audit of the City, the Lincoln Public Financing Authority, and the Successor Agency; preparation of the A nnual Comprehensive Financial Report; performance of Single Audit services when required; preparation of State Controller reports; and annual agreed-upon procedures related to the City’s GANN Appropriations Limit; and
WHEREAS, MUN CPAs, LLP proposed all-inclusive maximum fees for the base five-year term in the amount of $79,300 for Fiscal Year 2025/26, $81,300 for Fiscal Year 458
Resolution No. 2026-XXX
2026/27, $83,300 for Fiscal Year 2027/28, $85,400 for Fiscal Year 2028/29, and $87,500 for Fiscal Year 2029/30; and
WHEREAS, the City Council finds that award of the agreement to MUN CPAs, LLP is in the best interests of the City of Lincoln.
NOW THEREFORE BE IT RESOLVED:
Section 1. The City Council hereby awards the agreement for Financial Auditing Services to MUN CPAs, LLP for a five-year term for the fiscal years ending June 30, 2026 through June 30, 2030.
Section 2. The City Council hereby authorizes the City Manager to execute, on behalf of the City, an agreement with MUN CPAs, LLP in a form approved by the City Attorney, together with any non-substantive changes deemed necessary or appropriate by the City Manager and City Attorney, consistent with this Resolution.
Section 3. The City Council acknowledges that the agreement may, at the City’s discretion, be renewed for up to three additional one-year terms.
PASSED AND ADOPTED this 28th day of April, 2026 by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAIN: Councilmembers:
___________________________
Richard Pearl, Mayor
ATTEST:
Hope Ithurburn, City Clerk
459
CONTRACT FOR SERVICES
THIS CONTRACT is made on May 15, 2026, by and between the CITY OF LINCOLN (“City”), and MUN CPAs, LLP (“Consultant/Contractor”).
WITNESSETH:
WHEREAS, the City desires to enter into a contract for services with MUN CPAs, LLP, to provide professional financial auditing services and conduct a financial audit of its financial statements; and
WHEREAS, the City issued a Request for Proposals (RFP) on January 30, 2026; and
WHEREAS, MUN CPA’s, LLP presented a qualified proposal to the City, dated March 4, 2026, attached hereto and incorporated herein as Exhibit A , and is duly licensed, qualified and experienced to perform those services;
NOW, THEREFORE, the parties hereto mutually agree as follows:
1. SCOPE OF SERVICES:
A. Consultant/Contractor shall do all work, attend all meetings, produce all reports and carry out all activities necessary for the completion of the services described in Exhibit A (“Scope of Work”). This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of any conflict among the Contract Documents, the conflict shall be resolved in the following order of precedence: (1) any duly authorized amendments to this Contract; (2) the audit Engagement Letter between the City and the Consultant/Contractor (incorporated by reference pursuant to Section 1.D); (3) the main body of this Contract (excluding exhibits); and (4) the remaining exhibits and attachments, including Exhibit A and Exhibit B. The parties agree that Exhibit A (the Consultant/Contractor’s proposal) is incorporated solely to describe the Scope of Work and deliverables. Any terms or conditions in Exhibit A or in the City’s RFP that are not expressly included in this Contract, or that conflict with this Contract or the Engagement Letter, shall be null and void and of no force or effect.
B. Consultant/Contractor enters into this Contract as an independent contractor and not as an employee of the City. The Consultant/Contractor shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant/Contractor are employees, agents, contractors or subcontractors of the Consultant/Contractor and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant/Contractor by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract.
C. The Consultant/Contractor agrees i t has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.
D. Engagement Letter . The parties shall execute the Consultant/Contractor’s audit 460
engagement letter for the services under this Contract (the “Engagement Letter”). The Engagement Letter is hereby incorporated by reference into this Contract and made a part of the Contract Documents. It defines the responsibilities of City management and the Consultant/Contractor, the scope and limitations of the services, and other terms required by professional standards. In the event of any conflict between the Engagement Let ter and any other Contract Document, the Engagement Letter shall govern to avoid the possibility of a conflict with professional standards.
2. TERM OF CONTRACT:
A. The services of Consultant/Contractor are to commence upon execution of this Contract by the City, and shall be undertaken and completed in accordance with the Scope of Work outlined in Exhibit A. This Contract will commence upon execution of the City and expire five years from the date of execution. Said contract shall be renewable at the City’s discretion each year thereafter up to a maximum of three years.
B. Consultant/Contractor’s failure to complete work in accordance with Exhibit A may result in delayed compensation as described in Section 3.
C. The City Manager or his or her designee may, by written instrument signed by the Parties, may extend the duration of this Contract each year thereafter up to a maximum of three years. For each one-year extension under this Section, the parties shall review the Scope of Work, Schedule of Performance, and compensation to determine whether material changes in circumstances (such as the adoption of new or revised professional standards or significant changes in the City’s operations or requirements) necessitate an adjustment of the scope, schedule, or fees. Any adjustments agreed to shall be set forth in a written amendment to this Contract pursuant to Section 5.
3. COMPENSATION:
The Consultant/Contractor shall be paid through progress billings throughout the duration of the project for the actual fees, costs and expenses for all time and materials required and expended, but in no event shall total compensation exceed the following table without the City’s prior written approval. The City’s account code to be charged is 6000 4020 50400.
A. Said amounts due shall be paid upon submittal of a monthly, detailed invoice by Consultant for services performed. Consultant/Contractor shall furnish City with invoices for all expenses as well as for all materials authorized by this Contract. The invoice (s) shall be submitted 461
monthly. If Consultant/Contractor’s performance is not in conformity with the Schedule of Performance, Exhibit B, payments may be delayed or denied, unless the Consultant/Contractor’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform to the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.
B. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section
4. C. If changes in laws, regulations, professional standards, or the City’s requirements or operations materially increase the scope, level of effort, or cost of the services under this Contract, any additional services or adjustments shall be authorized only by a written amendment in accordance with Section 5. Such amendment shall include any necessary modifications to the Scope of Work, Schedule of Performance, and compensation (including fees or rates). The Consultant/Contractor is not obligated to perform, and the City shall not require, any work beyond the agre ed-upon Scope of Work unless and until the parties execute a written amendment as described in this Section.
4. TERMINATION:
A. This Contract may be terminated by either party, provided that the other party is given not less than 30 calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.
B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant/Contractor is given written notice (delivered by certified m ail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant/Contractor shall immediately suspend its activities under this Contract.
C. Except as provided in Section 4.E, Consultant/Contractor shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant/Contractor, and the City may withhold any payments due to Consultant/Contractor until such time as the exact amount of damages , if any, due the City from Consultant/Contractor is determined.
D. In the event of termination, the Consultant/Contractor shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including, but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.
E. Consultant/Contractor’s Right to Suspend or Terminate Services.
Consultant/Contractor may suspend the performance of services, or terminate this Contract, without breach or liability, if any of the following occurs: (i) the City fails to perform its material obligations or fulfill its responsibilities under this Contract or the Engagement Letter; (ii) circumstances arise that prevent the Consultant/Contractor from performing the services in accordance with applicable professional standards; or (iii) continued performance of the services would require the Consultant/Contractor to vio late or potentially violate applicable law, professional standards, or ethical requirements. In any such event, the Consultant/Contractor shall provide prompt written notice to the City of the suspension or termination and the reasons therefore. The Consul tant/Contractor 462
shall be entitled to compensation for all services performed and reimbursable expenses incurred up to the effective date of such suspension or termination.
5. AMENDMENTS, CHANGES OR MODIFICATIONS:
Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto. The parties acknowledge that this is a multi -year engagement; accordingly, amendments may be necessary from time to time to address material changes in professional standards, the City’s operations, or other circumstances affecting the scope, schedule, or compensation for the services. Any such amendment shall be made in accordance with this Section 5 and shall be in writing signed by both parties.
6. EXTENSIONS OF TIME:
Consultant/Contractor may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Scope of Work in the manner provided in Section 5. For purposes of this Section, ‘good cause’ includes delays or changes resulting from circumstances beyond the Consultant/Contractor’s control, including the City’s failure to timely provide necessary information or fulfill its obligations, or the enactment of new professional requirements that necessitate revisions to the scope or schedule of services.
7. PROPERTY OF CITY:
A. It is mutually agreed that all materials prepared by the Consultant/Contractor under this Contract shall become the property of the City, and the Consultant/Contractor shall have no property right therein whatsoever. Immediately upon termination , the City shall be entitled to, and the Consultant/Contractor shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant/Contract or in performing this Contract which is not Consultant/Contractor’s privileged information, as defined by law, or Consultant/Contractor’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant/Cont ractor’s possession. The Consultant/Contractor’s audit working papers and related internal documentation prepared for its own use in performing the services under this Contract shall remain the exclusive property of the Consultant/Contractor and are not re quired to be delivered to the City, except to the extent otherwise required by law or professional standards.
B. Additionally, it is agreed that the parties intend this to be a contract for services and each considers the products and results of the service s to be rendered by Consultant/Contractor hereunder (the “Work”) to be a work made for hire. Consultant/Contractor acknowledges and agrees that the Work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of the City. Notwithstanding the foregoing, the term ‘Work’ as used in this Section 7 does not include any of the Consultant/Contractor’s working papers, internal documents, or proprietary materials that are not required to be provided to the City under this Contract; any such items shall remain the exclusive property of the Consultant/Contractor.
8. COMPLIANCE WITH ALL LAWS; PREVAILING WAGES:
A. Consultant/Contractor shall comply with all applicable laws, ordinances, and codes of 463
federal, state and local governments, as applicable, and shall commit no trespass on any public or private property in performing any of the work authorized by this Contract. If necessary, it shall be City’s responsibility to obtain all rights of way and easements to enable Consultant/Contractor to perform its services hereunder. Consultant/Contractor shall assist City in providing the same.
B. Some or all of the work herein may be a “public work” within the meaning of Labor Code section 1720, subject to the payment o f prevailing wages under Labor Code sections 1720 et seq. Accordingly, Consultant/Contractor shall cause all such work, as applicable, to be performed as a “public work” in compliance with California prevailing wage laws, including the payment of prevailing wages, as applicable. In the event it is determined that the Consultant/Contractor is required to pay prevailing wages for the work performed under this Agreement, but failed to do so, the Consultant/Contractor shall pay all applicable penalties, costs, fees, wages, and wage differential. To the extent the project is subject to the requirement of payment of prevailing wages pursuant to California Labor Code sections 1720 et seq, then the project is subject to compliance monitoring and enforcement by the D epartment of Industrial Relations. Copies of the prevailing rate of per diem wages are on file at the City’s offices, which shall be made available to any interested party on request.
Consultant/Contractor shall cause a copy of the determination of the director of the prevailing rate of per diem wages to be posted at each job site, as well as all related notices required by applicable law and regulation. In the event that the work performed requires payment of prevailing wages, contractor shall be required to be registered with Department of Industrial Relations as a Public Works Contractor at all times during performance of the contract. Contractor shall also be required to submit Certified Payroll reports to the City of Lincoln as a condition of any payment under this contract.
9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT/CONTRACTOR:
A. Consultant/Contractor agrees, represents and warrants to City that it has all licenses, permits, qualifications and approvals of whatever nature which are legally required f or Consultant/Contractor to practice its profession and to properly provide the services set forth in Exhibit A in a manner which is consistent with the generally accepted standards of Consultant/Contractor’s profession. Consultant/Contractor represents an d warrants to City that Consultant/Contractor shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Contract any licenses, permits and approvals which are legally required for Consultant/Contractor to practice its profession at the time the services are performed.
B. Consultant/Contractor agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, state and local law in accordance with Section 17A hereof.
C. Consultant/Contractor shall designate a project manager who at all times shall represent the Consultant/Contractor before the City on all matters relating to this Contract. In the event that City, in its sole discretion, at any time during the term of this Contract, desires the removal of any person or persons assigned by Consultant/Contractor, including but not limited to the project manager, to perform services pursuant to this Contract, Consultant/Contractor shall remove any such person immediately upon receiving notice from City of the desire of City for the removal of such person or persons.
D. Except as set forth in Exhibit D, Consultant/Contractor shall, at its sole cost and expense, furnish all facilities, equipment, and other materials which may be re quired for furnishing services pursuant to this Agreement. City shall furnish to Consultant/Contractor only the facilities, equipment, and other materials listed in Exhibit D according to the terms and conditions set forth in 464
Exhibit D.
E. (Consultant/Contractor shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant/Contractor in writing within sixty (60) days of discovery. Should Consultant/ Contractor fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant/Contractor shall be liable for any expenses thereby incurred.)
10. SUBCONTRACTING:
None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant/Contractor shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant/Contractor.
11. ASSIGNABILITY:
Consultant/Contractor shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld. However, claims for money due or to become due to Consultant/Contractor from the City under this Contract may be assigned to a financial institution or to a trustee in bankruptcy, without such approval. Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.
12. INTEREST IN CONTRACT:
Consultant/Contractor covenants that neith er it, nor any of its employees, agents, contractors, subcontractors have any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the performance of its services hereunder. Consultant/Contractor shall make all disclosures required by the City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant/Con tractor’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant/Contractor also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant/Contractor in writing that Consultant/Contractor’s duties under this Contract warrant greater disclosure by Consultant/Contractor than was originally contemplated. Consultant/Contractor shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.
13. MATERIALS CONFIDENTIAL:
All of the materials prepared or assembled by Consultant/Contractor pursuant to performance of this Contract are confidential and Consultant/Contractor agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.
14. LIABILITY OF CONSULTANT/CONTRACTOR-NEGLIGENCE:
Consultant/Contractor shall be responsible for performing the work under this Contract in a 465
manner which is consistent with the generally accepted standards of the Con sultant/Contractor’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant/Contractor or its employees, agents, contractors or subcontractors.
15. INDEMNITY AND LITIGATION COSTS:
To the greatest extent allowed by law and within the co nstruct of Civil Code § 2782, Consultant/Contractor shall indemnify, defend, and hold harmless the City, its officers, officials, agents, employees and volunteers (the “indemnified parties”) from and against any and all claims, damages, demands, liability, costs, losses and expenses, including court costs and reasonable attorneys’ fees, arising in any manner out of its performance of this Contract or by reason of negligent acts or omissions, recklessness, or willful misconduct incident to the performance of this Contract on the part of Consultant/ Contractor [except such loss or damage which was caused by the active negligence, sole negligence, or willful misconduct of the City ]. Without limiting the foregoing indemnity obligation, Consultant/Contractor furth er shall indemnify, defend and hold harmless the indemnified parties from and against any and all damages, liability , costs, losses, expenses, contributions and penalties, including court costs and reasonable attorneys’ fees, arising from Consultant/Contractor’s misclassification of itself or its employees’ status as an independent contractor. The provisions of this paragraph shall survive termination or suspension of this Contract.
16. CONSULTANT/CONTRACTOR TO PROVIDE INSURANCE:
A. Consultant/Contractor shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A:VII (or in the case of Worker’s Compensation insurance, with the State Compensation Insurance Fund of California).
B. Prior to execu tion of this Contract and prior to commencement of any work, the Consultant/Contractor shall furnish the City with certificates of insurance and copies of original endorsements providing evidence of coverage for all policies required by the Contract. The endorsements shall be signed by a person authorized by the insurer to bind coverage on its behalf.
The Consultant/Contractor agrees to furnish one copy of each required policy to the City, and additional copies as requested in writing, certified by an authorized representative of the insurer. The failure of Consultant/Contractor or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Appro val of the insurance by the City shall not relieve or decrease any liability of Consultant/Contractor.
C. In addition to any other remedy the City may have, if Consultant/Contractor fails to maintain the insurance coverage as required in this Section, the C ity may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant/Contractor under this Contract.
D. No policy required by this Contract shall be endorsed to suspended, voided, canceled, 466
terminated by either party, or reduced in coverage or in limits unless the Consultant/Contractor has provided thirty (30) days’ prior written notice by certified mail, return receipt requested, to the City.
E. Any deductibles, aggregate limits, pending claims or lawsuits which may diminish the aggregate limits, or self-insured retentions, must be declared to, and approved by, the City.
F. Aggregate Limits/Impairment
i. If any of the insurance coverages required by this section contain annual aggregate limits, the Consultant/Contractor must give the City notice of any pending claim or lawsuit which may diminish the aggregate. The Consultant/Contractor must take steps to restore the impaired aggregates or provide replacement insurance protection. The City has the option to specify the minimum acceptable aggregate limit for each line of coverage required. No substantial reductions in scope of coverage which may affect City’s protection are allowed without City’s prior written consent.
G. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant/Contractor are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant/Contractor under the Contract.
H. The Consultant/Contractor and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contrac t not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant/Contractor and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant/Contractor or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract.
I. Worker’s Compensation and Employer’s Liability Insurance.
i. Worker’s Compensation Insurance to protect the Consultant/Contractor, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and federal statutes and regulations. The Consultant/Contractor shall execute a certificate of compliance with Labor Code Section 3700, on the form provided in the Contract Documents.
ii. Consultant/Contractor shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant/Contractor
J. Commercial General Liability Insurance
i. The insurance shall be provided on form CG0001, or its equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractua l liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than [$1,000,000.00] per occurrence and [$2,000,000.00] general 467
and products/completed operations aggregates.
ii. The commercial general liability insurance shall also include the following:
a) Endorsement equivalent to CG 2010 1185 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
b) Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
c) Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured ag ainst whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
d) Provision or endorsement stating that any failure to comply with reporting or other provisions of the policies including breaches of representations shall not affect coverage provided to the City, its officers, officials, employees, or volunteers.
e) Provision or endorsement stating that such insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Consultant/Contractor under the Contract, including, without limitation, set forth in Section 15, Indemnity and Litigation Costs.
K. Commercial Automobile Liability Insurance.
i. The commercial automobile liability insurance shall include, but shall not be limited to, protection against claims for death, bodily or personal injury, or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured.
The amount of insurance coverage shall not be less than [$1,000,000] per occurrence.
ii. The commercial automobile liability insurance shall in clude the same endorsements as required for Commercial General Liability Insurance (16.J.ii above.)
L. Professional Liability.
The Consultant/Contractor and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not b e less than [$1,000,000] per claim.
17. MISCELLANEOUS PROVISIONS:
A. Compliance With Laws . Consultant/Contractor shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed 468
by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work, including laws relating to prevailing wages pursuant to Labor Code section 1771 et seq.
B. Non-Discrimination. Consultant/Contractor shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orienta tion.
Consultant/Contractor shall comply with Section 122(a) of the State and Local Fiscal Assistance Act of 1972.
C. Inspection of Records . Consultant/Contractor shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant/Contractor.
D. Entirety of Agreement . This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing s igned by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing , including all exhibits to this Contract and the audit Engagement Letter incorporated herein by reference.
E. Notices. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:
CITY: City of Lincoln
Attn: City Manager
600 Sixth Street
Lincoln, CA 95648
CONSULTANT/CONTRACTOR: MUN CPAs LLP
Attn: Erica Pastor, CPA - Partner
1760 Creekside Oaks Drive, Ste 160
Sacramento, CA 95833
F. Governing Law. This Contract shall be interpreted and governed by the laws of the State of California.
G. Venue. Any action arising out of this Contract shall be brought in Placer County, California, regardless of where else venue may lie.
H. Attorneys’ Fees. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsi bility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party. 469
I. Counterparts. The parties may execute this Contract in two or more counterparts, which shall, in the aggregate, be signed by all the parties, each counterpart shall be deemed an original instrument as against any party who has signed it.
J. Severability. If any term, provision, covenant, or condition of this Contract is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the Contract shall remain in full force and effect and shall in no way be affected, impaired, or invalidated.
MUN CPAs, LLP CITY OF LINCOLN,
a municipal corporation
_______________________________ _____________________________ Erica Pastor, CPA Sean Scully, City Manager
Partner
Email: [email protected] _____________________________ Dated
APPROVED AS TO FORM:
_____________________________
Douglas White, Interim City Attorney
____________________________
Dated
ATTEST:
_______________________________
Hope Ithurburn, City Clerk
_______________________________
Dated
470
City Accountability:
Department responsible for contract: FINANCE DEPARTMENT Staff responsible for contract: NITA WRACKER, ASSISTANT CITY MANAGER
ATTACHMENTS:
Contract for Services (signed by Consultant/Contractor) Current Insurance Certificate (applicable to the contract & naming City as additional insured) Detailed Scope of Work & Specifications, including hourly rates, etc. Amount__________________ & Account/Fund _________________________________ Current City Business License (required if working in Lincoln) Copies of Quotes
EXHIBIT A
CITY OF LINCOLN – FINANCIAL AUDIT SERVICES
SCOPE OF WORK
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
EXHIBIT B
SCHEDULE OF PERFORMANCE
Phase Estimated Completion
Audit Interim Planning and Fieldwork June 30th
Audit Year-End Fieldwork October 31st
Final Audit and Financial Statements December 31st
Final Single Audit and Submit to Audit Clearinghouse January 31st
Preparation and Submission of State Controllers Office
Financial Transaction Reports January 31st
The five year contract term for financial auditing services will commence upon execution of the contract by the City and expire five years from date of execution. The City may extend this contract each year thereafter up to three years.
493
EXHIBIT C
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
Labor Code § 1861
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of t hat code, and I will comply with such provisions before commencing the performance of the work of this contract.
MUN CPAs, LLP
By:_________________________________
Erica Pastor, CPA
Partner
_________________________________
Date
494
EXHIBIT D
FACILITIES, EQUIPMENT, OTHER MATERIALS
Consultant/Contractor shall be responsible for providing all necessary facilities, equipment and personnel to undertake the necessary task(s) outlined in Exhibit A.