Cities Index.
Agenda packet, regular meeting

Lindsay City Council
July 26, 2022

Document
Agenda packet, regular meeting
Meeting
July 26, 2022
Body
Lindsay City Council
Pages
281
Original file
28.5 MB
Text extracted from the city's file for reading and search. Open the original on lindsayca.api.civicclerk.com. That file is the official record.

Section 4: Answer 2 questions below.

Program Goal or Objective ID #
Max.

Poss.

Pts.

Project’s Outcomes Questions Point Guidance Applicant
Response
Applicant's
Self Score
Advance equity for
underserved
communities.
4-1 4
What percentage of census
tracts within a 1/4 mile of the
project site qualify as
underserved?
> 51%=4pts,
40-50%=3pts,
20-39%=2pts
< 20% = 1pts
100% 4
4-2 4
What percentage of transit
routes within a 1/2 mile of the
project site reach an
underserved community?
> 51%=4pts,
40-50%=3pts,
20-39%=2pts
< 20% = 1pts
50 3
4-3 4
Will the project create or
improve access to a key
connection across a major
physical barrier in an
underserved community?
Yes = 4pts.,
Somewhat = 2pts.,
No or NA = 0pts.

Will the improved project site Yes = 4pts.,
4-4 4 function for people with Somewhat = pts.,
disabilities or special needs? No or NA = 0pts.
70 July 26, 2022 Regular Meeting of the Lindsay City Council

Page 138 ends

Section 5: Answer 2 questions below.

Program Goal or Objective ID #
Max.

Poss.

Pts.

Project’s Outcomes Question Point Guidance Applicant
Response
Applicant's
Self Score
Greening to provide
shade, reduce urban
island effect, and use
native, low-water plants.
5-1 4
What is the anticipated
decrease in impervious surfaces
at the project site?
0-25% = 1 pt.,
26-50% = 2pts.,
51-75% = 3pts.,
76-100% = 4pts.
5-2 4
What will be the percent
increase in native, drought
tolerant plantings?
0-25% = 1 pt.,
26-50% = 2pts.,
51-75% = 3pts.,
76-100% = 4pts.
65 3
5-3 4
What is the anticipated percent
increase of shade measured at
the noon hour?
0-25% = 1 pt.,
26-50% = 2pts.,
51-75% = 3pts.,
76-100% = 4pts.
5-4 4 What is the anticipated increase
of greening or tree canopy?
0-25% = 1 pt.,
26-50% = 2pts.,
51-75% = 3pts.,
76-100% = 4pts.
60 3
Total of Scores from Sections 1 to 5:

Project Outcomes
(Max Possible is 40)
37 71
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 139 ends

Clean California Local Grant Program Grant Agreement
Package Checklist
Complete Restricted Grant Agreement (RGA) packages shall be submitted through email to the District Grant Manager. Documents listed below for Agencies submittal are to be in pdf format. It is recommended that each document be submitted as a standalone document and not as one pdf containing all documents. Submittals will all be via email, no mailed copies of the RGA will be accepted.

The Final RGA Executed packages, once executed by Caltrans, will be returned to Agency and will include the following;
• Fully Executed RGA’s signed by both the Agency and Caltrans • CCLGP Guidelines
• Approved Indirect Cost Rate (if applicable)
• Approved Grant Application
• Fully Executed Amendment to Grant Application (if applicable) • Agency Resolution
District: ______
Agency Name: ______________________________________
Project Name: ___________________________________________________________________________ Agency shall submit to Grant Managers the following:
• RGA’s signed by authorized signatory
• Approved Indirect Cost Rate (if applicable)
• Amendment to Grant Application signed by authorized signatory • Agency Resolution
• Completed RGA Checklist
Directions:

Awardee shall complete the following checklist. Once checklist is complete, the document shall be flattened prior to submittal to the Grant Manager as part of the signed RGA package.

1. All Restricted Grant Agreement packages must include a completed Payee Data Record (STD 204) prior to grant agreement execution, to be submitted via email to July 26, 2022 Regular Meeting of the Lindsay City Council

Page 140 ends

[email protected]. Have you submitted the Payee Data Record (STD ☐ Yes
☐ Yes
☐ Yes
204) and cc’d your Grant Manager?
☐ Yes

2. If seeking reimbursement for indirect costs attach the Indirect Cost Rate approval letter prior to grant agreement execution. Have you attached the indirect cost rate approval letter?
☐ N/A

3. All Restricted Grant Agreement packages must include the Agency Resolution prior to grant agreement execution. Have you attached the Agency Resolution? ☐Yes

4. Is Agency seeking for reimbursement payments to be electronically transferred directly to the Agency’s designated banking account using an electronic funds transfer? If yes, have you submitted the Electronic Funds Transfer (EFT) Enrollment Form FA-2656 to the Caltrans’ Division of Accounting?
☐ N/A

5. Has Agency attached the Restricted Grant Agreement signed by the individual identified in the Agency Resolution?
☐ Yes

6. Has Agency attached the Amendment to Grant Application, including all applicable amended documents and attachments, and signed by the individual identified in the Agency Resolution?
☐ N/A

7. All Restricted Grant Agreement packages must include this RGA Checklist. Have you completed this RGA checklist?
☐ Yes
_____________________________ ___________________________ _____________ Local Agency Contact Name Local Agency Signature Date
To Be Completed by Caltrans CCLGP District Grant Manager I, the CCLGP District Grant Manager for the above referenced project, have reviewed the submitted RGA package from the Agency. I have confirmed all items identified for submittal to Grant Managers listed above are complete and have been submitted.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 141 ends

☐ Yes
District CCLGP Grant Manager Name: _________________________ Date: ___________ July 26, 2022 Regular Meeting of the Lindsay City Council

Page 142 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
In the security banner above, please click on "Options" and select "Trust this document one time only" before completing the form.

After you select to trust the document, you will be asked if you want to save the document before closing, select "No". If the banner is not visible, open the panel on the left side of the screen and click on the exclamation icon.

I. PROJECT DESCRIPTION

1.1 PROJECT INFORMATION
Assembly District Senate District Congressional District 14 26 22
Caltrans District: 6
Notes:
* Fill out the information in this table based on project location, rather than location of the primary project applicant. If a project contains multiple locations, enter information for each location. ** For information on Senate, Assembly, and Congressional Districts, see:
https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=4c2e0aba9e174138a794a98e82cb22cc.

1.2 LOCATION INFORMATION*
Does this project encroach onto Caltrans right-of-way? Yes No Location Information - Local Jurisdiction
Begin Latitude
of Parameters**
Begin Longitude
of Parameters**
End Latitude
of Parameters**
End Longitude
of Parameters** Description*** Street Address City Zipcode (x) 36.203036 (y) 119.095830 (x) 36.199843 (y) 119.095151 Olive Bowl Renovation/ Kaku Park Expansion
18 N Olive Ave Lindsay 93247
Location Information - State Highway System
Description*** Caltrans
District County Route Route Suffix
Begin
Postmile
Prefix
Begin
Postmile****
Begin
Postmile
Suffix
End
Postmile
Prefix
End
Postmile****
End
Postmile
Suffix
Notes:
* Projects can include multiple locations. Provide Latitude and Longitude Parameters, as well as a brief description for each location in your project.
** Please provide this in the following format: [((x) ###.######), ((y) ###.######); x=Latitude and y=Longitude *** For example, is the location a park, path, bus stop, viaduct, etc.? ****The Postmile fields are only applicable for streets that are part of the State Highway System. If a location is a single point, then provide the same begin and end postmile values. Link to Postmile Lookup: https://postmile.dot.ca.gov/PMQT/PostmileQueryTool.html.

1.3 SUMMARY BUDGET INFORMATION
Project Title Olive Bowl Renovation/Kaku Park Expansion Grant Amount Requested* $4,650,920
Total Project Cost $4,650,920
Local Match % 0
Total Cash Local Match
Total Third-Party In-Kind Local Match
Total Local Match $0
Does this project involve funding from other programs? Yes No If any program or fund types are checked below, please state the program or fund name and total amount received from each.

If Yes to the above, please select all the different types of other funding programs that apply and provide summary information for each program
Federal Programs
State Programs
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 143 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
California State Park Funds Prop 68 $3,670,437
Local Funds
Private Fund
Notes: * For this table, round amounts up to the nearest thousand.

ADVANCE PAYMENT INFORMATION
Are you seeking advance payment? Yes No
What is the total value of your advance payment request? What is the advance payment as a percentage of the grant award? AGENCY TYPE - Check which of the following best describes your agency

1.4 PRIMARY PROJECT APPLICANT INFORMATION

ORGANIZATION
City of Lindsay

CONTACT NAME
Joseph Tanner
TITLE
City Manager

PHONE NUMBER
559-562-7102

EMAIL ADDRESS
[email protected]
Local or Regional Public Agency Transit Agency Federally Recognized Tribal Government Other Public Agency - Indicate here what type of agency your organization is:

1.5 PRIMARY PROJECT APPLICANT MARKETING/COMMUNICATIONS CONTACT INFORMATION

CONTACT NAME
Curtis Cannon
TITLE
Planning Manager

ORGANIZATION
City of Lindsay

PHONE NUMBER
559-562-7102

EMAIL ADDRESS
[email protected]

1.6 SUB-APPLICANT INFORMATION (IF APPLICABLE)

CONTACT NAME TITLE ORGANIZATION

PHONE NUMBER EMAIL ADDRESS
AGENCY TYPE - Check which of the following best describes your agency Local or Regional Public Agency Transit Agency Federally Recognized Tribal Government Other Public Agency - Indicate here what kind of agency your organization is:

1.7 PROJECT OVERVIEW
Will this project displace people experiencing homelessness? Yes (Note: Project is ineligible for funding)
No
Indicate what elements are included in the project(s). Check all that apply.

ENHANCED INFRASTRUCTURE
ENHANCED NON-INFRASTRUCTURE - Litter Abatement Events and/or Educational Programs Estimated Installation/Construction Complete Date: 6/30/2024 (Note: Must BE ON OR before June 30, 2024)

SUB-AGREEMENTS
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 144 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
Is this project associated with any other Caltrans projects? Yes
No
- If Yes, enter Caltrans Contact Email:

1.8 PROJECT DESCRIPTION
PROVIDE GENERAL PROJECT DESCRIPTION (Max of 150 words)
Funding would allow for extra lighting, a walking path, play ground area, gateway sign, trees, turf, irrigation, stakepark, wayfinding signs and a restroom building for the future Olive Bowl Park renovations and Kaku park expansion. This grant would also fund the formation of a new Lindsay Walking Club through reimbursing a local community volunteer to lead monthly walks to promote physical activity and community wellbeing.

1.9 PURPOSE AND NEED
PROVIDE PURPOSE AND NEED OF PROPOSED ELEMENTS (Max of 150 words) For the past fifteen plus years, the infrastructure and park amenities at Olive Bowl have become rundown and old. Lack of city funds prevented the upkeep of the park facilities and the ability to replace rundown park amenities with new features. Over the course of 2019, the City of Lindsay actively pursued a community-driven plan to select features and amenities voiced by local residents and stakeholders. The community generated plan was a central component of the Prop 68 California State Park Funds, which was awarded to the City in 2020. Due to the Covid-19 Pandemic there was pause in any implementation of the grant funds. Now there is a unique window of opportunity to raise additional funds to support the full scope of the plans as envisioned through the 2019 community meetings and workshops. Poverty and obesity rates in the City are among the worst in the state.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 145 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
II. UNDERSERVED COMMUNITIES

2.1 ANALYSIS OF BENEFITS TO UNDERSERVED COMMUNITIES*
Is this project located in an underserved community?
Yes
No
Partially located in an underserved community
List all the census tract number(s) applicable to the project** Census Tract: 28.00 Median Household Income
Census Tract: 26.01 Median Household Income
What percentage of the total grant request will go towards benefiting underserved communities? 100.00% Notes:
* See section “Underserved Communities” in the Program Guidelines for definitions of historically excluded, disadvantaged, or underserved communities.
** Link to Census Tract Lookup: https://data.census.gov/cedsci/?intcmp=aff_cedsci_banner

2.2 LOCAL MATCH REQUIREMENT*
What was the criteria used to determine the applicant's required local match? Median Household Income
CalEnviroScreen 3.0
Free or Reduced Priced School Meals
Healthy Places Index
Native American Tribal Lands
Other
Not Applicable
What is your community’s required local match,
as a percentage of total project costs?** 0
Total Value of Cash Local Match
Total Value of Third-Party In-Kind Local Match
Total Value of Local Match $0
Notes:
* Costs incurred prior to or after the end date of an executed agreement are not eligible for reimbursement and will not be counted towards local match requirements. See the Accounting Requirements section of the Program Guidelines for details. ** See Table 2 “Severity of Disadvantage Thresholds for Determining Local Match” in the Program Guidelines for how to determine the local match required.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 146 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
III. ATTACHMENTS

3.1 ATTACHMENTS
Below is a list of all the possible attachments you can include. See Application Instructions for details on what the attachments should include.

Use the "Attach" button under each attachment type to upload the file.

The maximum file size for attachment D, E, and G is 25MB each and 5MB for all other files.

REQUIRED ATTACHMENTS:

OPTIONAL ATTACHMENTS:

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 147 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
IV. PROJECT OUTCOMES
Enter values in the Total column for just the Outputs that apply to your project.

4.1 PROJECT OUTCOMES
Category Output Unit Total
Litter Abatement
Litter Collected Cubic Yards 0
Public Space Cleaned Square Feet 0
Anti-Littering Signs Number of Signs 0
Waste Bins Number of Bins 0
Transit Center
Improvements
Litter Collected Cubic Yards 0
Beautification of Space Number of Bus Stops Beautified 0 Number of Transit Centers
Beautified
0 Number of Art Installations 0
Enhance Public Health
Increased Walking Paths, Bike
Paths, Children's Play Areas
Square Feet 52246
Beautification
Art Installations Number of Installations
Square Footage of Installations
0 0
Urban Heat Island Reduction Decrease in Temperature by
Degrees Fahrenheit at each
Improved Site, Measured at the
Noon Hour
0 Shade Trees Planted Number Planted 72
Drought-Tolerant, Native Plants Number Planted 72
Furniture Added Number of Seats Added 0
Enhanced Use
Play Equipment Installed Number of Play Equipment
Features Installed
2 Public Space Reclaimed for Public
Use or Added for Public Use
Square Feet 44246
Increased Use of Existing Public
Space
Increased Number of Hours per
Day Available
3 Enhanced Community
Connection
Wayfinding Signage Number of Signs Added 5
Community/Historical Signs and
Markers
Number of Signs Added 0
Jobs and Volunteer Positions
Created
New Permanent or Temporary
Jobs Created and Number of
Artists Supported by the Prime
Awardee and all Consultants/
Contractors to Implement or
Maintain the Project(S)
Number of Permanent Persons
Hired
0 Number of Temporary Persons
Hired
50 Number of Artists Supported 0
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 148 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
Category Output Unit Total
Pavement and Support
Elements
Enhanced Paving (permeable
surface or pavement alternatives,
such as wood chips)
Square Feet 67347
Decreased Pavement Square Feet 0
Upgraded or Improved Permanent
Irrigation Systems
Linear Feet 1500
Bioretention Swales and other
Green Street Elements
Each 4
Energy-Conserving Lighting
Installed
Number of Energy-Conserving
Lights Installed
50 Renewable Energy Technologies
(e.g. solar panels)
Each 0
Installations of Water Fountains Number of Water Fountains Installed
0 Installation or Refurbishment of
Bathrooms
Number of Toilets Installed or
Refurbished
4 Architectural Fencing
(not chain-link)
Linear Feet 0
Shade Structures
(not including shade trees - see
Beautification category)
Number of Shade Structures 2
Education
Campaigns
Community Events
# of Campaigns 0
Reach of the Campaigns 0
Frequency of the Campaigns 0
# of Events 10
# of Attendees 100
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 149 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION

CLEAN CALIFORNIA LOCAL GRANT PROGRAM (CCLGP) APPLICATION CCLGP-AP001 (NEW 11/2021)
V. SIGNATURES
IMPORTANT: Applications will not be accepted without all required signatures.

Primary Applicant: Chief Executive Officer, Public Works Director, or other officer authorized by the governing board. The undersigned affirms that their agency will be the “Implementing Agency” for the project if funded with CCLGP funds and they are the Chief Executive Officer, Public Works Director or other officer authorized by their governing board with the authority to commit the agency’s resources and funds. They are also affirming that the statements contained in this application package are true and complete to the best of their knowledge. For infrastructure projects, the undersigned affirms that they are the manager of the public right-of-way facilities (responsible for their maintenance and operation) or they have authority over this position.

5.1 AUTHORIZED OFFICIAL (PRIMARY APPLICANT) SIGNATURE
Print Full Name Neyba Amezcua
Title Director of City Services & Planning
Phone 559-562-7102
Email [email protected]
Date 2/1/2022 Signature Neyba Amezcua Digitally signed by Neyba Amezcua Date: 2022.02.01 16:36:58 -08'00'
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 150 ends

Application Instructions for
Detailed Engineer's Estimate and Total Project Cost
• Applicants are expected to use this template for estimating/documenting the cost of construction items and the overall project costs. (participating & nonparticipating) •The Detailed Engineer's Estimate and Total Project Costs must tie to the information presented in the CCLGP Application Form. • Do NOT input values in gray cells. These cells are formula-driven and will automatically update.

Project (Engineer's) Information
• The Licensed Engineer in 'responsible charge' of the overall CCLGP application must review all information presented in this Estimate form and ensure the values are consistent with the corresponding plans included in the application. This requirement is considered necessary to ensure the CCLGP application meets the PSREquivalent requirements - including the use of construction items, quantities and unit prices that meeting industry standards for PSR-Equivalents. The engineer is also expected to review the breakdown of participating vs. non-participating costs shown in estimate and confirm they are consistent with Program Guidelines.

Engineer's Estimate & Cost Breakdown
For each construction item in this table, the following items must be filled:

Item: indicate the name of a construction item used in this project.

Quantity: indicate the total quantity of each construction item Units: indicate the units of measurement (i.e. Square Feet or SQFT.) Only use Lump Sum (LS) for items listed on the Allowable Lump Sum tab.

Unit Cost: indicate the unit cost for one quantity.

Total Item Cost will be automatically calculated once the above information are provided for each line item (row).

The Project Estimate form only has a limited number of lines. If your estimate has more items; you will have to combine similar items. If an applicant has already developed a complete estimate using another tool, the items can be grouped into sub-categories such as overhead, bike lanes, sidewalks, drainage, utilities etc., as long as the full estimate is attached to the estimate or with the application in the Additional Attachments section.

General Overhead:

Costs for these items have been separated out to reduce confusion relating to participating vs. non-participating costs calculations.

The % of participating vs. non-participating costs are automatically calculated based on the ratio of these costs for all of the other construction items.

Cost Breakdown
Participating Items/costs: these are expected to represent all scope of work construction items that are necessary for the purposes of beautifying and cleaning up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces. %- Insert the percentage of the total item cost that is directly attributed to "Participating items". $- This field will automatically calculate once a percentage is entered in the previous question.

Non-participating Items/costs: these are expected to represent all construction items that are not necessary for the purposes of beautifying and cleaning up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces.

Subtotals and Contingencies:

Subtotal of Construction Items: This field will automatically calculate the total of all construction items indicated above.

Construction Item Contingencies: Insert percentage of contingencies, which is intended to account for the cost of minor construction items not defined at the time the applications are prepared.

Total (Construction Items and Contingencies) Cost: This field will automatically calculate the total from all information indicated above.

Project Delivery Costs: The participating vs. non-participating split is automatically calculated for all Project Delivery Costs.

Project Approval & Environmental Document (PA&ED): Total cost of Environmental Studies and Permits phase of the project.

Plans, Specifications & Estimate (PS&E): Total cost of Plans, Specifications and Estimates phase of the project.

Total Preliminary Engineering (PE): This total is automatically calculated. Total of (PA&ED) + (PS&E) Note: Per the Caltrans Local Assistance Procedures Manual, the total cost for PE should not exceed 25%. All costs over the 25% must be shown in the application as non-participating.

Right of Way Engineering: Total cost of Right of Way Engineering, including obtaining the RW Certification.

Acquisitions and Utilities: Total cost of Acquisitions and Utilities.

Total RW: This total is automatically calculated. Total of (RW Eng.) + (Acq.&Utilities) Total Pre-Construction Costs: This total is automatically calculated. Total of (PE) + (RW) Construction Engineering (CE): Total cost of Construction Engineering. Note: Per the Caltrans Local Assistance Procedures Manual, the total cost for CE should not exceed 15%. All costs over the 15% must be shown in the application as non-participating.

Total Construction Costs: This total is automatically calculated. Total of (CE) + (Con. Item. & Contig.) Total Project Cost Estimate: The participating vs. non-participating split is automatically calculated for the Total Project Costs. • This is automatically calculated from all information entered above. • This value must represent the total estimated cost of the entire CCLGP project. • The application must account for the non-participating costs being funded with local funds. Because this local funding is considered non-participating, it cannot be considered leveraging or matching funding.

Documentation of Non-Participating Costs:

Non-participating Items/costs: these are costs for items outside of the program guidelines or necessary project parameters of proposed scope of work. Master plan or other activates not necessary for the purposes of beautifying and cleaning up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces are considered non-participating costs.

Engineers must present their logic and calculations for splitting the projects costs between participating and non-participating costs.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 151 ends

Project Information:

Agency: Date:

Project Description:

Project Title
Project Location:

License #:

Engineer's Estimate and Cost Breakdown:

Cost Breakdown
Engineer's Estimate (for Construction Items Only) CCLGP Participating CCLGP Non-participating Costs/Items Costs/Items
Item
No. Item Quantity Units Unit Cost TotalItem Cost % $ % $ General Overhead-Related Construction Items
1 Mobilization & Demobilization 1 LS $200,000.00 $200,000 100% $200,000 100%
100%
100%
General Construction Items
2 Field #1 (288'/300'/300') - LED Lighting 1 LS $436,000.00 $436,000 100% $436,000 3 Field #2 and Field #3 LED Lighting 2 EA $195,000.00 $390,000 100% $390,000 4 Walkway - LED Lights 1 LS $360,000.00 $360,000 100% $360,000 5 Parking Lot - LED Lights 1 LS $54,000.00 $54,000 100% $54,000 6 Concrete paving 4", natural grey,
broom finish 39,728 SF $7.50 $297,960 100% $297,960
7 Concrete paving 7" at vehicular area,
natural grey, broom finish 4,518 SF $10.00 $45,180 100% $45,180 8 Asphalt concrete paving 8,654 SF $3.50 $30,289 100% $30,289 9 Stabilized Decomposed Granite 20,135 SF $4.00 $80,540 100% $80,540 10 Play Area Curb 460 LF $30.00 $13,800 100% $13,800
11 6" Concrete Mow Curb 1,552 LF $12.00 $18,624 100% $18,624 12 Entry Monument 1 EA $8,000.00 $8,000 100% $8,000
13 15 Gal. Trees 42 EA $100.00 $4,200 100% $4,200
14 24" Box Trees 30 SF $350.00 $10,500 100% $10,500
15 Soil Preparation for planting areas 6,000 SF $0.60 $3,600 100% $3,600 16 Soil Preparation for turf (Passive Areas) 67,347 SF $0.60 $40,408 100% $40,408 17 Turf (Seed) (Passive Areas) 67,347 SF $0.25 $16,837 100% $16,837 18 Booster Pump 1 allow $60,000.00 $60,000 100% $60,000 19 Irrigation Ballfields 97,457 SF $1.50 $146,186 100% $146,186 20 Ballfield Infield Rotors 1 LS $12,000.00 $12,000 100% $12,000 21 Tree Irrigation (Bubblers) 72 EA $150.00 $10,800 100% $10,800 22 Irrigation for Turf (Passive Areas) 67,347 SF $1.85 $124,592 100% $124,592 23 Maintenance and Plant establishment Period (Working Day) 60 WD $500.00 $30,000 100% $30,000 24 Play Equipment 2 EA $300,000.00 $600,000 100% $600,000 25 Playground Surfacing 1 EA $200,000.00 $200,000 200% $400,000 26 Play Equipment Shade Structure 2 EA $100,000.00 $200,000 100% $200,000 27 Exercise Circuit Training 1 LS $100,000.00 $100,000 100% $100,000 28 Skatepark 8000 SF $50.00 $400,000 100% $400,000
29 Wayfinding Signs 5 EA $5,000.00 $25,000 100% $25,000 30 Restroom/Concession/Storage BLDG 1 EA $300,000.00 $300,000 100% $300,000 Subtotal of Construction Items: $4,418,515 $4,418,515
$4,418,515 $4,418,515
Project Delivery Costs:

Type of Proje Cost $
CCLGP Participating Costs CCLGP Non-participating Costs $200,000 "PE" costs / "CON" costs
$ 200,000 $200,000 5% 25% Max
$150,000
$ 150,000 $150,000
$350,000 $350,000
Construction Engineering (CE) "CE" costs / "CON" costs
$231,485 5% 15% Max
$4,650,000 $4,650,000
CCLGP Participating Costs Non-participating Costs
$5,000,000
Documentation of Non-Participating Costs: g g p g
CCLGP-Participating and Non-participating costs must be documented $ -
$ 150,000.00
$ 200,000
$5,000,000
$ 231,485
Total PE:

Right of Way Engineering:

Acquisitions and Utilities:

Total RW:

Right of Way (RW)
Construction Engineering (CE):

Total Construction Costs:

Total Project Cost:

Total Pre-Construction Costs (PE+RW):

Detailed Engineer's Estimate and Total Project Costs
Important: Read the Instructions in the first sheet (tab) before entering data. Do not enter data in shaded fields (with formulas).

Olive Bowl Renovation
Environmental Studies and Permits(PA&ED):

Plans, Specifications and Estimates (PS&E):

Preliminary Engineering (PE)
Construction Item Contingencies (% of Construction Items):

Total (Construction Items & Contingencies) cost:

Name of Licensed Engineer in responsible charge of preparing or reviewing this PSR-Equivalent Cost Estimate:
4/8/2022 1 of 2
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 152 ends

Project Information:

Agency: Date:

Project Description:

Project Title
Project Location:

License #:

Detailed Engineer's Estimate and Total Project Costs
Important: Read the Instructions in the first sheet (tab) before entering data. Do not enter data in shaded fields (with formulas).

Olive Bowl Renovation
Name of Licensed Engineer in responsible charge of preparing or reviewing this PSR-Equivalent Cost Estimate:

Separate logic is required for each item which is partly a participating cost for CCLGP funding or is required for the construction of a non-participating item/element of the project.

Item #: Description of Engineer's Logic: (See examples shown in the Instructions) 4/8/2022 2 of 2
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 153 ends

Project Milestone
Project Study Report Approved
Begin Environmental (PA&ED) Phase
Circulate Draft Environmental Document
Draft Project Report
End Environmental Phase (PS&ED Milestone)
Begin Design Phase (Ready to List for Advertisement Milestone) Begin Right of Way Phase
End Right of Way Phase (Right of Way Certification Milestone) End Construction Phase (Construction Contract Acceptance Milestone) MUST BE NO LATER THAN 6/30/2024
Begin Closeout Phase
End Closeout Phase (Closeout Report) REPORTS AND FINAL INVOICES

MUST BE RECEIVED, APPROVED AND PROCESSED BY CALTRANS BY 12/31/24
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 154 ends

Date Total Cost
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 155 ends

Item Description- Common Unit Pay

CLEARING AND GRUBBING LS

CONSTRUCTION AREA SIGNS LS

CONSTRUCTION SURVEY/STAKING LS

DEVELOP WATER SUPPLY LS

DUST CONTROL LS

EROSION CONTROL LS

FINISHING ROADWAY LS

JOB SITE MANAGEMENT LS

MITIGATION LS

MOBILIZATION LS

MOBILIZATION, DEMOBILIZATION, AND FINAL CLEANUP LS

PERMITS LS

PREPARE STORM WATER POLLUTION PREVENTION PLAN LS

PREPARE WATER POLLUTION CONTROL PROGRAM LS

RAILROAD FLAGGING & MISCELLANEOUS LS

RE OFFICE LS

SIGNS LS

STRIPING LS

TRAFFIC CONTROL SYSTEM LS

TRAFFIC MANAGEMENT PLAN LS
Item Description- Not common Unit Pay

ABANDON SEWER LS

ADL BURIAL LOCATION REPORT LS

ASBESTOS COMPLIANCE PLAN LS

AUTOMATED WORK ZONE INFORMATION SYSTEM LS

BOOSTER PUMP LS

BRIDGE REMOVAL LS

BUILDING WORK LS

CAMERA SYSTEMS LS

CERTIFY EXISTING BACKFLOW PREVENTERS LS

CHANGEABLE MESSAGE SIGN SYSTEM LS

CHECK AND TEST EXISTING IRRIGATION FACILITIES LS

CLEAN AND PAINT BRIDGE RAILING LS

CLEAN AND PAINT STEEL SOLDIER PILING LS

CLEAN AND PAINT STRUCTURAL STEEL LS

CLEAN AND PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS

CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS

CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS

CONTROL AND NEUTRAL CONDUCTORS LS

CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD) LS

DATA CORE LS

DRAINAGE PUMPING EQUIPMENT LS

DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS) LS

DUST PALLIATIVE LS

ELECTRIC SERVICE FOR BOOSTER PUMP LS

ELECTRIC SERVICE FOR IRRIGATION LS

FIBER OPTIC CABLE SYSTEMS LS

FISH PROTECTION LS

FLASHING BEACON SYSTEM LS

HEALTH AND SAFETY PLAN LS

INDUCTIVE LOOP DETECTOR (LS) LS

INTELLIGENT COMPACTION LS

INTERCONNECTION CONDUIT AND CABLE (LS) LS

INVASIVE SPECIES CONTROL LS
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 156 ends

IRRIGATION WATER SERVICE CHARGES LS

JACKING SUPERSTRUCTURE LS

LEAD COMPLIANCE PLAN LS
LIGHTING SYSTEM-(Electroliers are a separate item (EA)) LS

MAINTAIN EXISTING PLANTED AREAS LS

MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING

CONSTRUCTION
LS

MIX DESIGN (FULL DEPTH RECLAMATION-FOAMED ASPHALT) LS

MIX DESIGN (FULL-DEPTH RECLAMATION-CEMENT) LS

MOBILIZATION (MARINE ACCESS) LS

MODIFY BRIDGE RAILING (LS) LS

MODIFY PUMP PLANT LS

MODIFYING EXISTING ELECTRICAL SYSTEM LS

MONITOR WELL LS

NATURAL RESOURCE PROTECTION PLAN LS

NOA BURIAL LOCATION REPORT LS

NOISE MONITORING LS

OPERATE EXISTING IRRIGATION FACILITIES LS

PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS

PERMANENT EROSION CONTROL ESTABLISHMENT WORK LS

PLANT ESTABLISHMENT WORK LS

PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS

PREPAVING INERTIAL PROFILER LS

PRESTRESSING LS

PRESTRESSING CAST-IN-PLACE CONCRETE LS

PRESTRESSING PRECAST GIRDER LS

PRESTRESSING STEEL GIRDERS LS

PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS

PRUNE EXISTING PLANTS LS

PUBLIC SAFETY PLAN LS

PUMPING PLANT ELECTRICAL EQUIPMENT LS

PUMPING PLANT EQUIPMENT LS

RADAR SPEED FEEDBACK SIGN SYSTEMS LS

RAMP METERING SYSTEM LS

RECONSTRUCT DRAINAGE FACILITY (LS) LS

RECONSTRUCT FENDER LS

RECYCLED WATER IDENTIFICATION AND WARNING SIGNS LS

REMOVE CONCRETE (LS) LS

REMOVE CONCRETE (MISCELLANEOUS) (LS) LS

REMOVE CONCRETE CURB (LS) LS

REMOVE DOWNDRAIN (LS) LS

REMOVE DRAINAGE FACILITY (LS) LS

REMOVE IRRIGATION FACILITY LS

REMOVE RAILING LS

REMOVE REINFORCED CONCRETE BOX CULVERT (LS) LS

REMOVE RETAINING WALL (LS) LS

REMOVE RETAINING WALL (PORTION) (LS) LS

REMOVE SIGN STRUCTURE (LS) LS

REMOVE SIGN STRUCTURE WALKWAY (LS) LS

REMOVE SLOPE PAVING (LS) LS

REMOVE SOUND WALL (LS) LS

REMOVING EXISTING ELECTRICAL SYSTEM LS

ROADSIDE CLEARING LS

SALVAGE IRRIGATION FACILITY LS

SAMPLING AND ANALYSIS PLAN (NATURALLY OCCURRING ASBESTOS) LS July 26, 2022 Regular Meeting of the Lindsay City Council

Page 157 ends

SIGN ILLUMINATION SYSTEM LS

STAIN GALVANIZED SURFACES (LS) LS

STRAY CURRENT PROTECTION (BRIDGE) LS

STREET SWEEPING LS

TEMPORARY ACTIVE TREATMENT SYSTEM LS

TEMPORARY CONCRETE WASHOUT LS

TEMPORARY CONSTRUCTION MAT (LS) LS

TEMPORARY CREEK DIVERSION SYSTEMS LS

TEMPORARY DECKING LS

TEMPORARY FLASHING BEACON LS

TEMPORARY LIGHTING SYSTEM LS

TEMPORARY PEDESTRIAN ACCESS ROUTE LS

TEMPORARY SHORING LS

TEMPORARY SIGNAL AND LIGHTING LS

TEMPORARY SIGNAL SYSTEM LS

TEMPORARY SUPPORT LS

TIME-RELATED OVERHEAD (LS) LS

TRAFFIC MONITORING STATION SYSTEM LS

WATER METER CHARGES LS

WATER SUPPLY SYSTEM LS

WELL DEVELOPMENT LS

WORK AREA MONITORING (BRIDGE) LS
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 158 ends

Attachment D: Checklist for Agencies Considering their
Application as a PSR Equivalent
This checklist is for do not have an existing PSR or
PSR quivalent the State Highway System. Projects
should complete this form, and consult their District Contact listed on the CCLGP website about PSRs as soon as possible.

See the section on
Attachment D in the Application Instructions for more details.

Applicants who can use this checklist may consider their completed application with all required attachments as a PSR quivalent, if the topics listed below are thoroughly addressed in other parts of the application package. Check the box next to each of the below items that have been addressed in the application package.

Project background and history (discussed in Section A.2, “Demonstrated Community Need”, of the Project Narrative).

Inventory of environmental resources, identification of potential environmental issues, and the anticipated environmental processing type. In addition, describe potential mitigation requirements and associated costs. (Discussed in Section A.4, “Project Deliverability”, of the Project Narrative.)
Description of potentially hazardous materials/waste problems, potential mitigation or avoidance measures, and potential costs. (Discussed in Section A.4, “Project Deliverability”, of the Project Narrative.)
Identification of other funding sources, if applicable. (Listed these in Section 1.3, “Summary Budget Information”, in the main application form.) After all the boxes are checked, save and attach this completed form to your application in the “Attachment D: For Infrastructure Projects, Project Study Report or Equivalent with Engineer's Stamp” field.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 159 ends

Clean California Local Grant Program Fact Sheet
Project Title:

Project Sponsor:

Primary Contact:

Name Title Organization Email Phone
Project Location(s)
Assembly
District
Senate
District
Congressional
District
Caltrans
District
County/Counties City/Cities Route(s)
Project Scope
Briefly describe the project. Provide basic details about project type, purpose and need, etc.

Limit to words.

Project Cost
Total Project Cost: Total CCLGP Request:

Project Schedule
Project Start Date Project End Date
Project Benefits
Briefly describe the project outcomes/outputs, including any benefits to underserved communities. Limit to words.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 160 ends

Step hoose a definition by which to define the community surrounding the project as underserved See the section Underserved Communities of these guidelines for more information. If the community surrounding the project is considered underserved based on multiple options, choose the option that best supports the community’s status as underserved. Per Option 5, Tribal Communities require zero local match, and thus none of these calculations.

Ste Determine the SOD of the community surrounding the project Table 1. SOD of Community Surrounding the Project Site(s) List the Option Used to Determine SOD:
(For definitions of each of the 5 options, see the
section ”.)
Location Relative to
Project Site(s)
(1)
1 Project Site A
Census Tract
Number
(2)
Census Tract
Population
(3)
Metric Score of
Census Tract
using the
chosen option
listed above.
(4)
SOD of
Tract
(3) x (4)
(5)
2 Within a ¼
mile radius.
3 Within a ¼
mile radius.
4 Within a ¼
mile radius.
5 Project Site B
6 Within a ¼
mile radius.
7 Within a ¼
mile radius.
8 Within a ¼
mile radius.

TOTALS
SOD of Community Surrounding the Total of Column 5
= =
July 26, 2022 Regular Meeting
Project
of the Lindsay City Council
Total of Column 3

Page 161 ends

Table 1. SOD of Community Surrounding the Project Site(s) Location Relative to
Project Site(s)
(1)
Census Tract
Number
(2)
Census Tract
Population
(3)
Metric Score of
Census Tract
using the
chosen option
listed above.
(4)
SOD of
Tract
(3) x (4)
(5)
1 Project Site
2 Within a ¼
mile radius.
3 Within a ¼
mile radius.
4 Within a ¼
mile radius.
5 Project Site
6 Within a ¼
mile radius.
7 Within a ¼
mile radius.
8 Within a ¼
mile radius.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 162 ends

Step 3. Use Table 2 below to determine the Required Local Match based off the SOD of Community Surrounding the Project.

Table 2. Severity of Disadvantage and Corresponding Local Match Requirement SOD Criteria Ranges for SOD of Community
Surrounding the Project
Required Local Match
%
Option 1: Area Median Income (AMI) compared to Statewide Median Income (SMI)* Data: Census Tract Level Data from the 2019 American Community Survey 5-year (ACS5) Estimates
If the AMI SOD of the
surrounding
community is…
> $60,188
Then local
match is…
50 $56,426 to $60,188 37.5
$52,665 to $56,425 25
$48,903 to $52,664 12.5
< $48,903 0
Option 2: CalEnviroScreen 3.0 Percentile Score
Data: SB 535 List of Disadvantaged Communities or SB 535 Disadvantaged Communities Map If the CalEnviroScreen

3.0 SOD of the
surrounding
community is…
< 39
Then local
match is…
50 39 to 42 37.5
43 to 46 25
47 to 50 12.5
> 50 0
Option 3: Percentage of Students that Receive Free or Reduced Lunches** Data: California Department of Education website
If the Free Lunch SOD
of the surrounding
community is…
< 75
Then local
match is …
50 75 to 79 37.5
80 to 84 25
85 to 89 12.5
> 90 0
Option 4: Healthy Places Index (HPI) Score (use overall HPI score only) Data: California Healthy Places Index website
If the HPI SOD of the
surrounding
community is…
> 25
Then local
match is…
50 21 to 25 37.5
16 to 20 25
10 to 15 12.5
< 10 0
Option 5: Tribal Communities
Data: List of Federally Recognized Tribal Governments in California If the project applicant or sub-applicant is a Federally Recognized Tribal Government or the project area is located within (or partially within) Federally Recognized Tribal Lands (typically within the boundaries of a Reservation or
Rancheria), lands owned by or held in trust for an Indian tribe, allotted lands, and/or sensitive tribal areas (which might include areas in which a Native American Tribe has a
significant interest such as traditional cultural properties and sacred sites).

Then the local
match is…
0 *Communities with a population less than 15,000 may use data at the Census Block Group level. Unincorporated communities may use data at the Census Place level.
**During the development of these guidelines, the National School Lunch Program started offering free lunches to all students. Thus, if an applicant still wants to use this option, it is recommended that pre-pandemic data be used.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 163 ends

orms for Calculating Population Benefit (PB) (Overall)
and Relative PB (Underserved Community)
Step 1. If your project has no infrastructure work, skip to Step 3.

Step 2. If your project has infrastructure work, complete Tables 1 through 5 below. Information from tables 1 through 3 will be used to calculate the Infrastructure Work PB for both the overall and underserved community in Tables 4 and 5, respectively.

Table 1. Infrastructure Work – Direct PB (Overall and Underserved Community) On line 1, list the census tract in which the project is located.

On subsequent lines, list all census tracts within a ¼ mile radius of your project.

If your project is large or long, use a ¼ mile from the outer edges. If your project has multiple locations, list the census tracts for each location. Add more rows on the last page if necessary.

For each census tract listed, provide the information requested. For columns 4 and 5,
. If you choose “other” as your option, you must submit Attachment J with a justification of your methodology.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 164 ends

(1) (2) (3) (4) (5)
1 2 Within a ¼ mile
radius.
3 Within a ¼ mile
radius.
4 Within a ¼ mile
radius.
5 6 Within a ¼ mile
radius.
7 Within a ¼ mile
radius.
8 Within a ¼ mile
radius.

Population Totals (Overall) = (Underserved) =
Table 2. Infrastructure Work – Indirect PB
List all transits routes with at least one transit stop within a ½ mile radius of your project. If you project is large or long, use a ½ mile from the outer edges. Add more rows on the last page if necessary.

Total all ridership numbers.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 165 ends

(1) (2)
1 2
3 4
5 6
7 Total of the Average Daily Ridership of Qualifying Routes Table 3. Infrastructure Work – Dose
Determine the “dose” factor for the infrastructure work, which are the hours the site will be accessible to the public under the improved conditions.

List all sites and the hours for each site. Add more rows on the last page if necessary.

Calculate the average number of hours of all sites.
(1) (2)
1 2
3 4
5 6
7 Average of Hours if Project Contains Multiple Sites
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 166 ends

Table 4. Infrastructure Work PB (Overall)
Use information from Tables 1-3 to complete Table 4.
(Table 1, Column 3)
(1)
+ (Table 2, Column 2) ×
(2)
(Table 3, Column 2)
(3)
=
(4)
+ × =
Table 5. Infrastructure Work PB (Underserved Community) Use information from Tables 1-3 to complete Table 5.
(Table 1, Column 5)
(1)
+ (Table 2, Column 2)
(2)
× (Table 3, Column 2)
(3)
=
(4)
+ × =
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 167 ends

Step 3: If your application proposes educational campaigns or events about litter abatement, proper waste disposal, or how to do sanctioned artwork (as opposed to vandalism), use Table 6 to calculate PB of each non-infrastructure activity and total. If your application does not propose these activities, skip to Step 4.

Table 6. Non-Infrastructure Work PB
= Number of people reached at least once by an educational campaign or eligible event.
= Number of times the campaign will run, or the event will be held.
(1)
x
(2)
=
(3)
1 x =
2 x =
3 x =
4 x =
Total NI Work PB
Step 4. Calculate the Project’s Population Benefit (Overall). This score will be graded by the Department on a curve relative to all applications submitted. The number of points the applicant will be awarded for Scoring Component 2, Project Population Benefit, will be granted accordingly. The maximum number of points is 20.

Table 7. Project’s PB (Overall)
(From Table 4, Column 4)
(1)
+ (From Table 6, Column 3)
(2)
=
(3)
+ =
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 168 ends

Step 5. Calculate the Project’s Population Benefit (Underserved Community).

Table 8. Project’s PB (Underserved Community)
+ =
(From Table 5, Column 4) (From Table 6, Column 3) (3) (1) (2) + =
Step 6. Calculate the Project’s Relative Population Benefit to the underserved community.
÷
(From Table 8, column 3) (From Table 7, column 3)
(1) (2)
=
(3)
÷ =
Step 7. Calculate the number of points you, the applicant, will be awarded for Scoring Component 3, Project’s Relative Population Benefit to the Underserved Community. The maximum number of points is 35.

Table 10. Applicant’s Points for Scoring Component 3, Project’s Relative PB (Underserved Community)
(From Table 9, column 3)
(1)
×
(2)
=
(3)
× =
Examples of completed calculation forms based on a fictitious project can be found in Appendix A.4.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 169 ends

Additional rows for Tables 1 and .
(1) (2) (3) (4) (5)
9 10 Within a ¼ mile
radius.
11 Within a ¼ mile
radius.
12 Within a ¼ mile
radius.
13 14 Within a ¼ mile
radius.
15 Within a ¼ mile
radius.
16 Within a ¼ mile
radius.
(1) (2)
8 9
10 11
12 13
14 15
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 170 ends

(1) (2)
8 9
10 11
12 13
14 15
(1)
x
(2)
=
(3)
5 x =
6 x =
7 x =
8 x =
9 x =
10 x =
11 x =
12 x =
13 x =
14 x =
15 x =
16 x =
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 171 ends

Appendix B1. Demonstrated Need Assessment Form:
existing site
. Within each section
choose a maximum of two (2) questions to answer
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 172 ends

Table 1: Demonstrated Community Need Assessment Form
-
Describe the evidence there is a
recurring litter or land misuse in the
project area under existing
collection data or other empirical
data.

Range 0 – 5 pts.

No evidence = 0 pts Use box below Use box below
-2 5
Under existing conditions, does the
project site have adequate signage No = 5 pts.
pts.

Yes = 0 pts. and amenities for proper waste
disposal or prevention?
- 5
Under existing conditions, does the
site have physical features to
discourage inappropriate waste
disposal or dumping?
No = 5 pts.
pts.

Yes = 0 pts.
-4
Under existing conditions, does the
proposed community or project site Yes = pts.
= 2 pts.

No or N/A = 0 pts.
lack educational programs or events
about litter abatement or proper
waste disposal?
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 173 ends

2- 5
Under existing conditions
what percentage of the
project site needs
beautification?
0-20%
-40% = 2 pts.
-60%
-80% = 4 pts.
>80% = 5 pts.
2-2 5
Under existing conditions,
what percentage of the
project site is not functional
and/or accessible for
0-20%
-40% = 2 pts.
-60%
-80% = 4 pts.
>80% = 5 pts.
2- 5
Based on the hours the
project site is open,
approximately what
percentage of time is it
0-20%
-40% = 2 pts.
-60%
-80% = 4 pts.
>80% = 5 pts.
2-4 5
What percentage of the
project site is negatively
affected by graffiti or other
vandalism?
0-20%
-40% = 2 pts.
-60%
-80% = 4 pts.
>80% = 5 pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 174 ends

Does the project area
currently prevent a critical
Yes = 5 pts.
pts
No = 0 pts.
connection to daily life
- 5 destinations such as school,
medical care, jobs, or
groceries via
walking, biking,
-2 5
Is the public space a barrier or
route?
Yes = 5 pts.
pts
No = 0 pts.
- 5
Is the existing public
recreation space unusable for
its intended purposes?
Yes = 5 pts.
pts
No = 0 pts.
-4 5
Under existing conditions, are
there adequate/sufficient
recreation places in the
community?
No = 5 pts.
= pts
Yes = 0 pts.
-5
Under existing conditions, are
there enough places to sit at
No
= 2 pts
Yes = 0 pts.
-6 5
Does the existing project site
lack features or elements that
connect it to the culture or
history of the surrounding
community?
Yes = 5 pts.
= pts
No = 0 pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 175 ends

4- 5
How does the percentage of
usable public space in the
underserved community
compare to the region's
Below Avg. = 5pts.

Avg. = pts
Above Avg. = 0 pts.
4-2 5
Is the project area an Yes = 5 pts.
= pts.

No or N/A = 0 pts.
4- 5
Is the project site an Yes = 5pts.
= pts.

No or N/A = 0 pts.
4-4 5
Does the space function for
people with disabilities or
special needs?
No = 5pts.
= pts.

Yes or N/A = 0 pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 176 ends

5- 5
Under existing conditions
what percentage of the space
-
scaped?
0-20% = 5 pts.
-40% = 4 pts.
-60% = pts.
-80% = 2 pts.
- % = pts.
5-2 5
Under existing conditions,
what percentage of landscape
lacks native or low-water
plants?
0-20% = 5 pts.
-40% = 4 pts.
-60% = pts.
-80% = 2 pts.
- % = pts.
5- 5
What percentage of the space
is unusable due to lack of
-20% = pts.
-40% = 2 pts.
-60% = pts.
-80% = 4 pts.
- % = 5 pts.
5-4 5
What percentage of the
project site is unusable due to
excessive heat at midday?
0-20% = pts.
-40% = 2 pts.
-60% = pts.
-80% = 4 pts.
- % = 5 pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 177 ends

Appendix B2. Project’s Outcomes Assessment Form:

Within each section, choose a maximum of two questions to answer, for a total of 10 questions.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 178 ends

Table 2: Project’s Outcomes Assessment For
- 4
By what percentage will the
waste and debris within the
project site be reduced.
0-25% =
26-50% = 2 pts.
-75% pts.
76- = 4
-2
By what percentage will the
signage and amenities for
proper waste disposal or
prevention increase at the
project site?
0-
-66% = 2 pts.
67- pts.
- 4
What is the estimated
reduction of waste or debris at
the project site because of new
physical features to discourage
inappropriate waste disposal or
dumping?
0-25% =
26-50% = 2 pts.
-75% pts.
76- = 4
-4
What is the percent increase in
the number of educational
programs or events about litter
abatement and proper waste
0-
-66% = 2 pts.
67- pts.
-5
What is the percent increase in
the number of litter pickup and
waste disposal events?
0-
-66% = 2 pts.
67- pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 179 ends

2- 4 By what percentage will the project
site be beautified or improved?
0-
26-50% = 2 pts.
- pts.
76-
2-2 4
By what percentage do the
improvements increase the number
and/or diversity of viable uses in the
project site?
0-
26-50% = 2 pts.
- pts.
76-
2- 5
By what percentage do the
improvements increase access to
the project site?
0-
-40% = 2 pts.
-
-80% = 4 pts.
-
2-4 4
By what percentage will the quantity
of human scale, energy conserving
lighting be increased?
0-
26-50% = 2 pts.
- pts.
76-
2-5 4
What percentage of project site will
be improved with anti-graffiti/antivandalism solutions? 0-
26-50% = 2 pts.
- pts.
76-
2-6 4 Will visual art pieces be added to the
project site?
2 or more = 4 pts.
2-7 4
What is the percentage increase in
educational programs informing the
community how to do sanctioned
public artwork (as opposed to
vandalism/graffiti)?
0-
26-50% = 2 pts.
- pts.
76-
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 180 ends

- 4
Will the project create or
enable a critical connection to
daily life destinations such as
school, medical care, jobs, or
groceries via walking, biking, or
Yes = 4 pts.
pts.

No or N/A = 0 pts.
-2 4 Will the project improve a
walking or biking route?
Yes = 4 pts.
pts.

No or N/A = 0 pts.
- 4
Will the project improve or
rehabilitate an existing public
recreation space?
Yes = 4 pts.
pts.

No or NA = 0 pts.
-4 4
Will the project add new
recreation space to the
community?
Yes = 4 pts.
pts.

No or NA = 0 pts.
-5 4
By what percentage will the
project site(s) be improved for
walking or recreation?
0-
26-50% = 2 pts.
- pts.
76-
-6 4
Will the improved project site
incorporate features or
elements that connect it to the
culture or history of the
surrounding community?
Definitely = 4 pts.

Not at all = 0 pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 181 ends

4- 4
What percentage of census
tracts
project site qualify as
underserved?
= 4 pts.
40-50% = pts.
20- = 2 pts.
pts.
= 4 pts.
40-50% = pts.
20- = 2 pts. 4-2
4-
4-4
4 4
4 What percentage of transit
project site reach an
underserved community?
Will the project create or
improve access to a key
connection across a major
physical barrier in an
underserved community?
Will the improved project site
function for people with
disabilities or special needs?
pts.

Yes = 4 pts.
pts.

No or N/A = 0 pts.

Yes = 4 pts.
2 pts.

No or N/A = 0 pts.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 182 ends

5- 4
What is the anticipated
decrease in impervious surfaces
at the project site?
0-
26-50% = 2 pts. - pts.
76-
5-2 4
What will be the percent
increase in native, drought
tolerant plantings?
0-
26-50% = 2 pts. - pts.
76-
5- 4
What is the anticipated percent
increase of shade measured at
the noon hour?
0-
26-50% = 2 pts. - pts.
76-
5-4 4 What is the anticipated increase
of greening or tree canopy?
0-
26-50% = 2 pts. - pts.
76-
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 183 ends

1. Date:

2. Implementing Agency Name:

3. Project Title:

4. Project Description: Provide brief project description. 5a. Task Name:
5b. Task Summary: Provide a brief Task description for the various components to be completed in your project.

Start Date and End Date: Provide a start and end date for each Task Activity. (Month - Year) 6a. Activities: List all activities that will be completed in each Task. 6b. Deliverables: List all of the corresponding deliverables for each activity listed. 7a. Staff Time (Agency): List all agency staff title/position(s) that will work on this task. If more than one Agency, indicate staff & Agency Affiliation in each staff position.
(Example: Party 1 - Program Manager, LA Schools).

Select CCLGP or In-kind: Select the fund source (CCLGP or In-kind) that will pay for each staff position. In-kind refers to local funds, donations, or any other funding source that will not be reimbursed by the CCLGP.

Staff Hours: Provide the total number of estimated hours for each party listed.

Rate Per Hour: Provide the rate per hour of each party listed.

Subtotal Agency Costs: Leave Blank - This is automatically calculated. 7b. Staff Time (Consultant): Consultants do not have to identify the staff positions. For each consultant listed include an identifier to distinguish the work that the consultant will perform.
(Example: Part 2 - Consultant: Bike Safety Training)
Select CCLGP or In-kind: Select the fund source (CCLGP or In-kind) that will pay for each staff position. In-kind refers to local funds, donations, or any other funding source that will not be reimbursed by the CCLGP.

Staff Hours: Provide the total number of estimated hours for each party listed.

Rate Per Hour: If using a Consultant to perform the work, list the estimated Consultant cost/hr. or include an overall cost for that work. (Put "1" in Staff Hours and the "overall cost amount" in Rate Per Hour) Subtotal Consultant Costs: Leave Blank - This is automatically calculated. 7c. Total Staff Costs: Leave Blank - The Total Staff Cost is automatically calculated.

Only fill out this section if asking for indirect costs to be reimbursed through CCLGP.

Agencies should have an approved Indirect Cost Allocation Plan (ICAP) agreement with Caltrans.

Local agencies without an approved ICAP may request the approval of a “provisional ICAP rate” from the Caltrans Audits and Investigations (A&I) unit. Upon receiving an Acceptance Letter from Caltrans A&I, the local agencies will be allowed to invoice for their indirect costs using this “provisional rate” until A&I has completed the review of the local agencies ICAP proposal. 8a. Approved ICAP: Select the box if the implementing agency has an approved ICAP 8b. Rate: Input the "provisional rate" or the approved rate. 8c. CCLGP Indirect Costs: Input your own calculation of the rate by the cost to get the indirect rate.

9. Task Notes: Provide any additional information that will clarify the work to be conducted under this task.

Describe the who, what, when and where of your project. Attach an additional sheet if needed. 10a. Travel: Total cost of Travel; if applicable
10b. Equipment: Total cost of Equipment(s); if applicable 10c. Supplies/Materials: Total cost of Supplies/Materials; if applicable 10d. Incentives: Total cost of Incentives; if applicable. 10e. Other Direct Costs: Additional other direct costs; if applicable 10f. Provide any additional Other Direct Costs; if applicable 10g. Total Other Costs: Leave Blank - This is automatically calculated from Other Cost information provided.

11. Task Grand Total: Leave Blank - This is automatically calculated from the information provided under this task.

12. CCLGP Grand Total: Leave Blank - This is automatically calculated from the information provided under this task.

The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

Task Grand Total
You must click the link provided to direct you to the Itemized Other Costs section.

Note: An itemized cost estimate for each of the following categories, if applicable, must be provided.

For each item select the fund source (CCLGP or In-kind) that will pay for each staff position. In-kind refers to local funds, donations, or any other funding source that will not ask for reimbursement by the CCLGP.

INSTRUCTIONS
Task Notes
Other Costs
Exhibit 25-R: Non-Infrastructure Work Plan Estimates
Tasks are primary elements of a project. Provide a "Task Detail" table for each. (Task A, Task B, Task C, etc.) Staff Costs
Task Details
Activities and Deliverables
List all associated Activities for each task and all corresponding deliverables for each activity.

Do NOT input values in gray cells. Those cells are formula-driven and will automatically update.

Indirect Costs
Please be advised that the CCLGP cannot fund cost increases or overruns. The project sponsor or grant recipient is responsible for any cost increases or overruns. The workplan estimates must be as accurate as possible.

ATP V.11 (04/27/2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 184 ends

Date:

Implementing Agency Name:

Project Title:

Click the links below
to navigate to
"Task Details" tabs:

Task Total CCLGP $ Total Cost $
Task "A" $720 $720
Task "B" $200 $200
Task "C" $0 $0
Task "D" $0 $0
Task "E" $0 $0
Task "F" $0 $0
Task "G" $0 $0
Task "H" $0 $0
Task "I" $0 $0
Task "J" $0 $0
Total for all Tasks $920 $920
Non-Infrastructure Cost Proposal Work Plan Estimates
For Department use only
You will not be able to fill in the following items. Items will auto-populate once you've entered all "Task" tabs that apply:

Project Description: (4)
Enter information in each Task Tab, as it applies (Task A, Task B, Task C, Task D, etc.) Conduct enouragment activities through the formation of a Lindsay Walking Group. This support group will meet regularly at various parks through the City of Lindsay inviting nearby residents to join the walking club, for all age groups with guardian supersvison if required. 2-Feb-22
Olive Bowl Renovation / Kaku Park Expansion

CITY OF LINDSAY
Enter the Task Name from Each
Itemized Task
Task Summary:

Task Name
ATP V.11 (04/27/2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 185 ends

Start Date End Date

1. Apr-22 Apr-22

2. May-22 May-22

3. Jun-22 6/31/2022

4. 5.

6. 7.

8. 9.

10. Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match Total $ In-kind Match $ Party 1 - 20 $35.00 $700
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$700 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match Total $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$700
FALSE
Total $
$0
$0
$20
$0
$0
$0
$20
$720
Subtotal Consultant Costs:

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

Other Costs (10):

If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Task Notes (9):

Subtotal Agency Costs:

Indirect Costs (8)
Approved ICAP/ ICRP
(8a)?
Staff Time (Consultant/Subcontractor) (7b):

TASK "A" DETAIL ESTIMATE
Task Name (5a): Logo Design and Social Media
Design a flyer with a visual image to identifing the Walking Club and help organize event details displaying monthly meet up times and park locations. Once flyer is complete, post details on social media, local newspapers (i.e. Sun Gazzete, Recorder), Kiwanis Club, Rotary Club and other community based organizations.

Task Summary (5b):

Staff Costs (7):

Staff Time (Agency) (7a):

City of Lindsay, Assistant Planner
Deliverables (6b):

Flyer creation
Flyer Printing
Logo, flyer and social media posts
Printed copies of flyers
Meeting logistics & Trail Routes One on one conversations with Lindsay Wellness Center to select a suitable weekly day, time and locations for the activity
Task Activities (6a):

Total Staff Costs (Agency & Consultant) (7c):

Travel (10a):

Equipment (10b):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

Subtotals:

TASK GRAND TOTAL (11):

To fill out an itemized cost for each "Other
Cost", use Tab Task A "OC".

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 186 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. Durable Paper 15 $20 $20

2. 3.

4. 5.

6. 7.

8. 9.

10. 11.

12. $20 $0 $0
$20
Itemized Supplies/Materials Cost (10c)
Type of Equipment
Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

Task "A" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Type of Travel
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Equipment (10b)
Subtotals:

Subtotals:

Total Equipment Costs:

Total Travel Costs:

Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 187 ends

Task "A" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Subtotals:

Type of Other Direct Costs
Type of Other Direct Costs
Subtotals:

Total Itemized Incentives Costs:

Type of Other Direct Costs
Other Direct Costs (10f)
Itemized Other Direct Costs (10e)
Itemized Incentives Cost (10d)
If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Please provide an itemized "other" cost estimate for all other costs applicable to each task Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Subtotals:

Total Other Direct Costs:

Total Additional Itemized Other Direct Costs:

Incentives (10d)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 188 ends

Start Date End Date

1. Jul-22 Jul-02

2. Aug-22 Aug-22

3. Sep-22 9/31/22

4. Oct-22 Oct-22

5. Nov-22 Nov-22

6. Jan-23 Jan-23

7. Feb-22 Feb-23

8. Mar-23 Mar-23

9. Apr-23 Apr-23

10. May-23 May-23
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match Total $ In-kind Match $ Party 1 - 20 $10.00 $200
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$200 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match
Total $ In-kind Match $
Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$200
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$200
Staff Time (Agency) (7a):

Lindsay Wellness Club
August 2022 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
Task Summary (5b):

Task Name (5a):

TASK "B" DETAIL ESTIMATE
Walking Coordinator
This is a volunteer community resident who is in good physical health and cheerful attitude to lead the first ten walking sessions.

Task Activities (6a): Deliverables (6b):

July 2022 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
Staff Time (Consultant/Subcontractor) (7b):

Subtotal Agency Costs:

Total Staff Costs (Agency & Consultant) (7c):

Subtotals:

Approved ICAP/ ICRP
(8a)?
Subtotal Consultant Costs:

Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Task Notes (9):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

September 2022 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
October 2022 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
November 2022 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
January 2023 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
Febuary 2023 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
March 2023 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
April 2023 Walk Meet at one of the Lindsay Parks to lead the group through safe & comfortable public open spaces
May 2023 Walk
This is the last funded walk through the CCLP, local funds through fundraising events and other means will be collected during the course of July 2022 to May 2023 to help support future walks
Staff Costs (7):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

To fill out an itemized cost for each "Other
Cost", use Tab Task B "OC".

Travel (10a):

Equipment (10b):

TASK GRAND TOTAL (11):

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 189 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Task "B" Other Costs:

Itemized Travel Cost (10a)
Type of Travel
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Equipment (10b)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Itemized Supplies/Materials Cost (10c)
Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Subtotals:

Total Travel Costs:

Type of Equipment
Subtotals:

Total Equipment Costs:

Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 190 ends

Task "B" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Type of Other Direct Costs
Other Direct Costs (10f)
Subtotals:

Total Other Direct Costs:

Type of Other Direct Costs
If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Incentives (10d)
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Subtotals:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Itemized Other Direct Costs (10e)
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Subtotals:

Total Itemized Incentives Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 191 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Task Notes (9):

Approved ICAP/ ICRP
(8a)?
Total Staff Costs (Agency & Consultant) (7c):

Staff Time (Consultant/Subcontractor) (7b):

Indirect Costs (8)
Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

To fill out an itemized cost for each "Other
Cost", use Tab Task C "OC".

Travel (10a):

Equipment (10b):

Subtotals:

TASK GRAND TOTAL (11):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

TASK "C" DETAIL ESTIMATE
Task Activities (6a): Deliverables (6b):

Task Summary (5b):

Task Name (5a):

Staff Costs (7):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Staff Time (Agency) (7a):

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 192 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Task "C" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Type of Travel
Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Equipment (10b)
Itemized Supplies/Materials Cost (10c)
Subtotals:

Total Travel Costs:

Type of Equipment
Subtotals:

Total Equipment Costs:

Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 193 ends

Task "C" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Total Itemized Incentives Costs:

Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

Type of Other Direct Costs
Other Direct Costs (10f)
Subtotals:

Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Itemized Incentives Cost (10d)
Subtotals:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Itemized Other Direct Costs (10e)
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 194 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
Subtotal Consultant Costs:

Staff Time (Consultant/Subcontractor) (7b):

Subtotal Agency Costs:

Task Notes (9):

Task Name (5a):

Task Summary (5b):

Staff Costs (7):

Staff Time (Agency) (7a):

Total Staff Costs (Agency & Consultant) (7c):

Approved ICAP/ ICRP
(8a)?
Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

TASK "D" DETAIL ESTIMATE
Task Activities (6a): Deliverables (6b):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

To fill out an itemized cost for each "Other
Cost", use Tab Task D "OC".

Travel (10a):

Equipment (10b):

Subtotals:

TASK GRAND TOTAL (11):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 195 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ InKind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ InKind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ InKind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Equipment (10b)
Task "D" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Type of Travel
SubTotals:

Total Travel Costs:

Type of Equipment
SubTotals:

Total Equipment Costs:

Type of Supplies/Materials
SubTotals:

Total Supplies/Materials Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 196 ends

Task "D" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ InKind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ InKind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ InKind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Itemized Other Direct Costs (10e)
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
SubTotals:

Total Itemized Incentives Costs:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Type of Other Direct Costs
SubTotals:

Total Other Direct Costs:

Type of Other Direct Costs
SubTotals:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 197 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
Staff Time (Agency) (7a):

Staff Time (Consultant/Subcontractor) (7b):

Supplies/Materials (10c):

TASK "E" DETAIL ESTIMATE
Task Activities (6a): Deliverables (6b):

Task Name (5a):

Task Summary (5b):

Staff Costs (7):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Approved ICAP/ ICRP
(8a)?
Subtotals:

If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Task Notes (9):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

TASK GRAND TOTAL (11):

Indirect Costs (8)
Total Staff Costs (Agency & Consultant) (7c):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

To fill out an itemized cost for each "Other
Cost", use Tab Task E "OC".

Travel (10a):

Equipment (10b):

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 198 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Subtotals:

Total Equipment Costs:

Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Task "E" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Type of Travel
Equipment (10b)
Subtotals:

Total Travel Costs:

Type of Equipment
Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 199 ends

Task "E" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Type of Other Direct Costs
Subtotals:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Subtotals:

Total Itemized Incentives Costs:

Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
Itemized Other Direct Costs (10e)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 200 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
Staff Time (Consultant/Subcontractor) (7b):

Staff Time (Agency) (7a):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

To fill out an itemized cost for each "Other
Cost", use Tab Task F "OC".

Travel (10a):

Equipment (10b):

Total Staff Costs (Agency & Consultant) (7c):

Approved ICAP/ ICRP
(8a)?
Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Task Notes (9):

TASK "F" DETAIL ESTIMATE
Task Activities (6a): Deliverables (6b):

Task Name (5a):

Task Summary (5b):

Staff Costs (7):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Subtotals:

TASK GRAND TOTAL (11):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

Other Costs (10):

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 201 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Subtotals:

Total Equipment Costs:

Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Task "F" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Type of Travel
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Equipment (10b)
Subtotals:

Total Travel Costs:

Type of Equipment
Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 202 ends

Task "F" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Type of Other Direct Costs
Subtotals:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Subtotals:

Total Itemized Incentives Costs:

Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
Itemized Other Direct Costs (10e)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 203 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
Task Activities (6a): Deliverables (6b):

Staff Time (Agency) (7a):

Task Name (5a):

Task Summary (5b):

TASK "G" DETAIL ESTIMATE
Staff Time (Consultant/Subcontractor) (7b):

Total Staff Costs (Agency & Consultant) (7c):

Approved ICAP/ ICRP
(8a)?
Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Task Notes (9):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

Staff Costs (7):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Subtotals:

TASK GRAND TOTAL (11):

To fill out an itemized cost for each "Other
Cost", use Tab Task G "OC".

Travel (10a):

Equipment (10b):

Supplies/Materials (10c):

Incentives (10d):

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 204 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Subtotals:

Total Equipment Costs:

Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Task "G" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Type of Travel
Itemized Equipment Cost (10b)
Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Equipment (10b)
Subtotals:

Total Travel Costs:

Type of Equipment
Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 205 ends

Task "G" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Type of Other Direct Costs
Subtotals:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Subtotals:

Total Itemized Incentives Costs:

Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
Itemized Other Direct Costs (10e)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 206 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
Subtotals:

TASK GRAND TOTAL (11):

To fill out an itemized cost for each "Other
Cost", use Tab Task H "OC".

Travel (10a):

Equipment (10b):

Supplies/Materials (10c):

Incentives (10d):

Additional Other Direct Costs (10f):

Task Name (5a):

Task Summary (5b):

Staff Time (Agency) (7a):

TASK "H" DETAIL ESTIMATE
Task Activities (6a): Deliverables (6b):

Staff Costs (7):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Staff Time (Consultant/Subcontractor) (7b):

Other Direct Costs (10e):

Total Staff Costs (Agency & Consultant) (7c):

Approved ICAP/ ICRP
(8a)?
Task Notes (9):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 207 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Task "H" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Itemized Equipment Cost (10b)
Type of Travel
Subtotals:

Total Travel Costs:

Type of Equipment
Subtotals:

Total Equipment Costs:

Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Equipment (10b)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 208 ends

Task "H" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Subtotals:

Total Itemized Incentives Costs:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Itemized Other Direct Costs (10e)
Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

Type of Other Direct Costs
Subtotals:

If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 209 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
To fill out an itemized cost for each "Other
Cost", use Tab Task I "OC".

Travel (10a):

Equipment (10b):

Subtotals:

TASK GRAND TOTAL (11):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

Staff Time (Consultant/Subcontractor) (7b):

Staff Costs (7):

Staff Time (Agency) (7a):

TASK "I" DETAIL ESTIMATE
Task Name (5a):

Task Summary (5b):

Task Activities (6a): Deliverables (6b):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Total Staff Costs (Agency & Consultant) (7c):

Approved ICAP/ ICRP
(8a)?
Task Notes (9):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 210 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Task "I" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Itemized Equipment Cost (10b)
Type of Travel
Subtotals:

Total Travel Costs:

Type of Equipment
Subtotals:

Total Equipment Costs:

Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Equipment (10b)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 211 ends

Task "I" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Subtotals:

Total Itemized Incentives Costs:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Itemized Other Direct Costs (10e)
Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

Type of Other Direct Costs
Subtotals:

If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 212 ends

Start Date End Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
Party 4 -
Party 5 -
Party 6 -
$0 $0 $0
Staff
Hours
Rate
Per Hour CCLGP Total $ Local Cash Match $ In-kind Match $ Party 1 -
Party 2 -
Party 3 -
$0 $0 $0
$0
FALSE
Total $
$0
$0
$0
$0
$0
$0
$0
$0
To fill out an itemized cost for each "Other
Cost", use Tab Task J "OC".

Travel (10a):

Equipment (10b):

Subtotals:

TASK GRAND TOTAL (11):

Supplies/Materials (10c):

Incentives (10d):

Other Direct Costs (10e):

Additional Other Direct Costs (10f):

Staff Time (Consultant/Subcontractor) (7b):

Staff Costs (7):

Staff Time (Agency) (7a):

TASK "J" DETAIL ESTIMATE
Task Name (5a):

Task Summary (5b):

Task Activities (6a): Deliverables (6b):

Subtotal Agency Costs:

Subtotal Consultant Costs:

Indirect Costs (8)
If Approved ICAP/ ICRP box is
checked, provide Rate (8b):

Total Staff Costs (Agency & Consultant) (7c):

Approved ICAP/ ICRP
(8a)?
Task Notes (9):

Other Costs (10):

You will not be able to fill in the following items. The totals for each "Other Costs" category listed below will automatically calculate from information entered in the itemized other costs section:

ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 213 ends

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Task "J" Other Costs:

Itemized Travel Cost (10a)
Please provide an itemized "travel" cost estimate for all travel costs applicable to each task Travel (10a)
Itemized Equipment Cost (10b)
Type of Travel
Subtotals:

Total Travel Costs:

Type of Equipment
Subtotals:

Total Equipment Costs:

Type of Supplies/Materials
Subtotals:

Total Supplies/Materials Costs:

Please provide an itemized "equipment" cost estimate for all equipment cost applicable to each task Itemized Supplies/Materials Cost (10c)
Please provide an itemized "supplies/materials" cost estimate for all supplies/materials cost applicable to each task Supplies/Materials (10c)
Equipment (10b)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 214 ends

Task "J" Other Costs:

Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Quantity Units Cost $ CCLGP Total $ Local Cash
Match $ In-kind $

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.
$0 $0 $0
$0
Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10e)
Itemized Incentives Cost (10d)
Please provide an itemized "incentives" cost estimate for all incentives costs applicable to each task Incentives (10d)
Subtotals:

Total Itemized Incentives Costs:

Total Additional Itemized Other Direct Costs:

Type of Other Direct Costs
Itemized Other Direct Costs (10e)
Type of Other Direct Costs
Subtotals:

Total Other Direct Costs:

Type of Other Direct Costs
Subtotals:

If applicable, Additional Itemized Other Direct Costs (10f) Please provide an itemized "other" cost estimate for all other costs applicable to each task Other Direct Costs (10f)
ATP V.11 (04.27.2018)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 215 ends

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 216 ends

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 217 ends

X X 200'
200' 200'
200'
200'
X
X
X
X
X
X
X
X
X
X
W. APIA ST.

N. OLIVE AVE. 288'
300'
300'
HONOLULU ST.

SAMOA ST.

IVE AVE.
200'
EXIST. SIGN
REF
(BY OTHERS)
FRZ
(BY OTHERS)
SWINGS
SLIDES

REF (BY OTHERS)

FRZ (BY OTHERS)

02.1 ft

OLIVE BOWL-KAKU PARK

RENOVATION PROJECT
"CONCEPT DESIGN"

NEW TREES

CHILDREN'S PLAYGROUND

W/SHADE STRUCTURE

RESTROOM/

STORAGE BLDG

PICNIC ARBOR
TRASH

ENCLOSURES

BASEBALL
FIELD 1

SOFTBALL
FIELD 2

SOFTBALL
FIELD 3

RESTROOM/

CONCESSION/

STORAGE BLDG

PICNIC ARBOR

SKATEPARK

EXERCISE CIRCUIT

TRAINING

WALKING TRAILS
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 218 ends

Olive Bowl Park Renovation/
Kaku Park Expansion
City of Lindsay in
Tulare County
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 219 ends

Attachment A: Project Narrative Template
Directions:

1. Complete all sections in this form. Even if a section is not applicable to your project, write “N/A”. Do not leave any sections blank.

2. Provide succinct and complete responses in each section. The Narrative should include all pertinent information not already stated, or not explained sufficiently, in other application sections.

3. THIS FORM SHALL NOT EXCEED 10 PAGES. If you need additional space, you can delete these directions. Do not change the font in this form to include more information.

4. Do not assume that the application reviewer is familiar with your community. For more information on what the Narrative should include, see the section “Narrative” in the Program Guidelines.

5. Save the form as a .PDF and ensure its size does not exceed 5 MB. If it does, when you try to attach it to your application you will get a message stating it exceeds 5 MB and you will not be able to submit your application until you attach a Narrative that is 5 MB or smaller.

6. Attach the PDF to your application, in section 3.1, “ATTACHMENTS”, in the Attachment A: Project Narrative field. If you don’t attach a Project Narrative to your application, you will not be able to submit it.

A.1 PROJECT LOCATION AND DESCRIPTION
(REPLACE TEXT) Briefly describe:
• The public space or spaces to be addressed. Specify whether the space(s) is considered public right-of-way, a park, a pathway, a transit center, tribal land, or another type of space.

Describe where the space is located, including its visibility and access to the public. See the section “Eligible Project Area” in the Program Guidelines for more information. • Any important details about the project not already stated in the application in section 1.8, “PROJECT DESCRIPTION”.
• If applicable, any art, gateway monuments, or community identification pieces included in the project. At a minimum, the description should include the type of piece considered (e.g.e.g., a mural or a sculpture), its location, and the purpose or message behind the piece. The following is an example of an acceptable description: “A free-standing statue will be placed at the northeast corner of Franklin Park. The purpose of the statue will be to increase cultural connection.” See the section “Eligible Activities and Expenses” in the Program Guidelines for more information on criteria for art, gateway monuments, or community identification pieces. • If the project is associated with any Caltrans projects, how they are related.

In 2020 Olive Park, located just a quarter mile east of Highway 65, was awarded $3,670,437 million in California State Park Prop 68 funds. This has been a major win for the City of Lindsay since a major freeze on public investments between 2000 to 2010. During this time, public facilities received minimal to no funds for maintenance. The state of the City’s public facilities became dilapidated and rundown.

However, now, the City is almost fully recovered from the consequences of the financial freeze and has the appropriate staff and resources necessary to bring the City back to the thriving and bustling area it once used to be.

To remedy and fix these conditions, the City recently pursued efforts to apply for Prop 68 California State Park Funds. Over the course of 2019, the City met with the community over twenty times participating in lengthy workshops, brainstorming sessions and a conceptual review process to revitalize and expand Olive Bowl Park. The city was pleased to have been awarded the grant. Due to the Covid-19 pandemic, implementation of these funds have postponed the construction bidding July 26, 2022 Regular Meeting of the Lindsay City Council

Page 220 ends

process to select a skilled contractor. The pause in implementation presented a unique opportunity for the City to see how they can raise additional capital to deliver on the complete scope and items requested by the community. However, given the entire scope of the park and the prioritized renovations requested by the community, the Prop 68 grant is not sufficient to deliver on the entire scope and the list of prioritized renovations generated by the community. Therefore, the City is applying for the Clean CA grant so the entire project scope, as envisioned by the community, can be realized.

Filling in this gap of funds would allow for a prominent gateway sign, irrigation, trash cans, native landscaping, extra lighting, and wayfinding signs and other supporting features to support the daily operation and function of the parks. .

Furthermore, the Olive Bowl Park is located only one block away (750 feet) from the upcoming transit center, which would significantly facilitate the park’s accessibility and reach.

The Olive Bowl Park used to host many high school and middle school championship games. The City would like to bring back that level of activity and youth involvement. The future Lindsay transit center will also help residents, youth and members of the public to easily access the Olive Bowl and Kaku Park.

A.2 DEMONSTRATED COMMUNITY NEED
(REPLACE TEXT) Briefly describe:
• The demonstrated community needs that address the goals of the CCLGP program. Describe the existing conditions of the project location(s), and how the project meets one or more of the four stated program goals listed below. Address each selected goal separately.

Goal 1. Reduce the Amount of Waste and Debris: Describe the types of existing waste and debris, work to be performed to remove it, and who will perform the work.

Goal 2. Beautify and Improve Public Space: Describe the beautification or access improvements to be performed, including enhanced greening measures. Discuss any enhancements to be made, rehabilitation or restoration to be performed, and new installations to be placed.

Goal 3. Improving Public Spaces for Walking and Recreation: Describe improvements to be made to public spaces for walking and recreation, and how these improvements will enhance public health, cultural connection, and/or community placemaking.

Goal 4. Advance Equity for Underserved Communities: Projects that demonstrate a benefit to an underserved community, either directly or indirectly, will be more competitive. For these projects, applicants must explain which underserved community is benefited, how it was identified, and how the project benefits that community. Applicants should also explain the percentage of the grant funds that will benefit the community and how these percentages were calculated. Calculations can be based on the project’s relative population benefit to underserved communities (see Appendix A.2. of the program guidelines for details) or another methodology. If another methodology is used, provide a brief justification for using it. • If applicable, briefly describe any communities who are NOT underserved that will benefit from this project and how they will benefit.
• Any important details about the project not already stated in section 1.9, “PURPOSE AND NEED”, of the application.

Goal 1: Because the park has not been maintained for the past fifteen years, the original score board, benches and ball field have reached a deteriorated and dilapidated state. the original July 26, 2022 Regular Meeting of the Lindsay City Council

Page 221 ends

score board, benches and ball field. Overgrown grass and weeds have also taken over parts of this park.

This application seeks funding for new trash cans and recycle bins to be placed throughout the park. Currently there are no trash cans at the park.

Goal 2: A prominent gateway sign located at the park entrance on ____ near the northeast quadrant of the park, avenue, would reestablish this park and assist with reclaiming the identity it used to serve. Wayfinding signs pointing to nearby attractions as the McDermont Building and the future transit center would be placed near the gateway sign entrance. Native landscaping would replace the overgrown grass and weeds that are found in various areas of the park. Repairing the broken fencing will also bring a sense of security for its users.

Goal 3: Renovations to Olive Bowl and KakulKaku Park would immediately benefit the approximately 1,126 people who live within a quarter mile of the park. New landscaping, irrigation, wayfinding signs, trash cans and other amenities proposed in this application will create an inviting and friendly park.

This proposal supports collaboration between the Lindsay Wellness Center, Kiwanis Club and the Rotary Club to promote a Lindsay Walking Club, which will provide a social support group to encourage walking and physical activity across all of the City’s parks and public open spaces with a walking leader. The application proposes ten guided monthly walks funded through the CCLGP. For subsequent walks the city and community will strategize in advance sources of continued funding to support the time and energy of the walking leaders.

The area has a very low Healthy Places Index percentile of 3.2, meaning 96.8 percent are ranked with healthier living conditions. One statistic to highlight is the obesity rate among adults in this area is 40.9%. Programs such as the Lindsay Walking Club would directly help reduce this rate and promote overall community wellness.

Goal 4: Olive Bowl Park located in Census Tract 28 has a median household income of $24,161. Census Tract 26.01, located within a one fourth mile radius of Olive Bowl Park has a medium income of $27,442. Using the project benefit calculator provided in Attachment I of the Clean CA grant, the total underserved population benefit amounts to 140,998 people, 100% of the disadvantaged community.

Secondly, 17% of the residents living in Census Tract 28 and 6% of residents living in Census Tract 26.01 do not have a vehicle. This population of people would directly benefit from the improvements as they are most likely dependent on walking, biking and transit as a means of transportation.

A.3 PUBLIC ENGAGEMENT
(REPLACE TEXT) Describe the local public engagement process that culminated in the project proposal and how the proposal reflects community priorities. Include:
• How the project is consistent with or included in local or regional plans such as General Plans, Improvement Plans, bicycle and/or pedestrian plans, and complete street plans, as well as the public outreach that may have already taken place during the preparation of such plans. • Describe the stakeholder/community engagement efforts that went into identifying the proposed elements as a priority for the community, including engagement with communities and/or community-based organizations for projects that benefit underserved communities. May include references to engagement that was sponsored by Caltrans, as well as by others. • How exactly the public engagement influenced the project proposal.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 222 ends

The City’s 1989 General Plan, 2019 Housing Element, and the 2019 Environmental Justice Element all point to the importance of parks, including Olive Bowl/Kaku Park, and the role it plays for the City’s open space, circulation and community wellness. Given new staffing and administrative support, the City of Lindsay finally had the resources to take on large scale projects, and attention was dedicated to the Olive Bowl/Kaku Park Revitalization Project. In 2019 the City started creating a community-led proposal to prepare an application for competitive Prop 68 State Park funds. The proposal called for a

1.38 acre1.38-acre expansion of Olive Bowl Park and renovations to the existing space. Residents were asked about the things they like to do with their family and friends in their spare time, what makes their community unique, what they enjoy and find difficult about a typical day of their life, and what park features they hoped for. Over the course of twenty fivetwenty-five community meetings, residents were able to identify their challenges, brainstorm features, prioritize their features, map out optimal locations for the proposed features and conduct a final concept review resulting in a communitycreated plan. A brief summary of each meeting’s highlights including the time, location, number of participants are documented in the Prop 68 grant application, which the City has included in its supporting documents.

The prioritized park featuresfeatures, and amenities list generated by residents during the community planning meetings are as follows:
• Large Baseball/Softball Fields (2)
• Small Baseball/Softball Fields (2)
• Bathroom/Concession
• Picnic Area
• Shade Sails (4)
• Large Shelter (2)
• Large Playground
• Parking
• New Bleachers - Large (4) and Small (2)
• Stadium Lights (1 field)
• Security Cameras
• Walking Paths
• Strategic Park Lighting
• Park Benches
Among the top challenges the community identified were safety, sense of community, population growth and cardiovascular disease. Each prioritized feature addresses the challenges and presents new opportunities for community pride, civic engagement and physical activity.

The City was pleased to have been awarded this grant. Due to the Covid-19 pandemic the bidding and project implementation were put on hold. However, once engineering estimates were made of the entire scope and features requested by the community plan, the total estimate is approximately $6 million. This grant awarded $3.6 million which unfortunately does not deliver on all the features and amenities selected by the community. Therefore, this grant is seeking the difference in funds to complete the proposed features and include additional features, such as wayfinding, trash cans and other elements specified in the Attachment C (engineer’s estimate) that could not get funded July 26, 2022 Regular Meeting of the Lindsay City Council

Page 223 ends

A.4 PROJECT DELIVERABILITY
(REPLACE TEXT) Briefly describe the applicant’s certainty the projects will be delivered, opened to public, and all funds expended by June 30, 2024.
• Identify all permits required for the project and note all that have NOT been approved at time of application submittal. For any permit not obtained, explain how its approval will be achieved and the project completed prior to June 30, 2024. See the section “Eligible Project Area” in the Program Guidelines for more information on the types of permits needed for projects on Caltrans right of way.
• Describe any other known concerns or risks to opening the project to the public and/or expending all funds by June 30, 2024, and any proposed methods to mitigate those risks. • For infrastructure projects, describe all pre-construction work required to deliver this project and its completion date.

The city has exclusive rights to the park and its facilities because the city is the sole owner of Olive Bowl Park and the 1.38-acre expansion site, which is currently a dirt lot. If awarded, the new total amount possible for this project would increase to be able to account for all the infrastructure features originally requested in addition to wayfinding signage, trash receptacles, more lighting and other amenities that can enhance the existing community plan. Conceptual designs and preliminary engineering of the best locations for each feature has already been worked out. The project would be ready to enter a construction bidding process. We anticipate the bidding process, including selection of consultant and a signed agreement, would take about one to two months.

We anticipate construction to start soon after the contract has been awarded. This may take 5 to 7 months with an estimated ribbon cutting ceremony in October 2022.

While the park is in construction, the Lindsay Walking club will start taking place with its first location at the Lindsay Wellness center.

A.5 ADVANCE PAYMENT
(REPLACE TEXT) If you are requesting advance payment, provide a brief justification for your request.

See the section “Advance Payment Process” in the Program Guidelines for more information.

A.6 MARKETING PLAN
(REPLACE TEXT) Briefly describe how the applicant is going to market or publicize the project, including:
• Whether the project will include the development of marketing materials and resources such as press releases, press advisories, letters to the editor, fact sheets, social media posts, website pages, or speeches.
• For any infrastructure improvements that are part of the project, state whether there will be a ribbon cutting or opening ceremony.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 224 ends

The new renovations will immediately be noticed by the surrounding residents. Local baseball leagues and schools will also be notified of the improved ball field. Once games are officially held at the park, word of mouth will spread the news. The City website will also highlight the park renovations and share information about the new amenities that are available.

Secondly, the walking club will also act as a form of selfof self-advertisement because the start of each walk will begin at various parks starting with the City park. Once the park is open to the public, the walking club plan will meet in front of Olive Bowl/Kaku .Kaku. Parents, adults and children joining the group will come to know of the new park and its features.

A.7 MAINTENACE PLAN
(REPLACE TEXT) If applicable, briefly describe how the improvement(s) will be maintained, including:
• The anticipated lifespans of the project improvements. • How the improvements will be maintained throughout their lifespans. • The resources to perform maintenance activities.
• The commitment of those resources.
• If artwork is part of the proposal, how that will be maintained, who will maintain it, and if there is a maintenance agreement in place with the artist.
• If planting of trees or other vegetation is part of the proposal, how plant establishment will be addressed.

This information is required for physical project improvements and litter abatement events (i.e., there needs to be an explanation of the strategy for preventing litter from accumulating again, after the abatement event has completed). Maintenance information is not required for educational programs. If your project does not require maintenance, write N/A here.

The City of Lindsay Parks and Rec division will conduct the regular maintenance and upkeep of the park and its new features. This includes, ensuring proper irrigation, grass and tree trimming, regular bathroom cleanup and trash pickup. Additionally, there would be a quarterly cleanup of dust and other particles that would accumulate be on the benches, the new scoreboard, the gateway sign, playground equipment and other infrastructure elements.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 225 ends

Tulare County Regional Transit Agency
559.623.0452
210 North Church Street Suite B
Visalia, CA 93291
www.tularecog.org

CITY OF DINUBA CITY OF EXETER CITY OF FARMERSVILLE CITY OF LINDSAY

CITY OF PORTERVILLE CITY OF TULARE CITY OF WOODLAKE COUNTY OF TULARE December 16, 2021
City of Lindsay
Joseph Tanner, City Manager
150 N Mirage Avenue
P.O. Box 369
Lindsay, CA 93247
Dear Mr. Tanner:

As the Executive Director of the Tulare County Regional Transit Agency (TCRTA), I would like to offer my support to the City of Lindsay for the grant application from the California Department of Transportation (Caltrans), Clean California Local Grant Program (CCLGP), and specifically for funds which will go to local communities to beautify and improve local streets and roads, tribal lands, parks, pathways, and transit centers to clean and enhance public spaces.

TCRTA is responsible for providing public transportation services to the City of Lindsay, and the Olive Bowl Park and Harvard Park Enhancements Project will improve access and connectivity to transit bus stops and the upcoming Lindsay Transit Center that will be serviced by both local and regional transit lines. I applaud the City’s success in securing other funding sources for its efforts to improve public spaces for walking and recreation at Olive Bowl Park and Harvard Park, and, given the vision behind the CCLGP, consider Lindsay the ideal intended recipient for these funds.

The Olive Bowl Park and Harvard Park Enhancements project represents an investment in the community that will do much to enhance public health, improve mobility and access to public space, and provide vital funding that directly benefits an underserved community.

If there is any additional support I can provide, please contact me at [email protected] or (559) 623- 0452.

Sincerely,
Richard I. Tree
TCRTA Executive Director
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 226 ends

210 N. Church, Suite B
Visalia, California 93291
Phone (559)623-0450
Fax (559)733-6720
www.tularecog.org
1 RE: Clean CA Local Grant Program for City of Lindsay Harvard Park and Olive Bowl/Kaku Park revitalizations
1120 N Street
Sacramento, CA 95814
To Whom It May Concern:

Tulare County Association of Governments (TCAG) supports the Clean CA proposals from our member agency, Lindsay, as they take the leadership and initiative to transform and revive some of the most distressed, dilapidated, and neglected areas in the state. TCAG is committed to improving the quality of life for residents and visitors throughout Tulare County, creating and coordinating regional transit programs to make getting around easy and convenient. The Harvard Park and Olive Bowl/Kaku Park revitalizations, as you will see throughout both of their applications, would create destination hot spots attracting more users to walk, bike and recreate in public open spaces.

Investing in lighting, landscaping and the park renovations discussed in both of their applications would directly help support the wellbeing, health, and physical activity of our residents. Obesity, diabetes, heart disease and childhood asthma levels in Tulare County are among the worst in the state in addition to poverty and unemployment rates. One of the few proven strategies to combat poverty and obesity is through physical activity, community wellbeing and sense of place. We believe this transformative project can help reduce our county’s poverty and obesity, which unfortunately is among some of the worst in the state.

As our agencies work to enhance the places our residents, live, work, and play, TCAG is working hard to create a comprehensive transportation system that will help our residents access these spaces through our planning for a Cross Valley Corridor System and ensuring the highways, streets and roads can service a variety of transportation modes. The Cross Valley Corridor (CVC), for example, is a vital existing east-west rail corridor between the cities of Huron and Porterville with the future high-speed rail. Olive Bowl/Kaku Park is located than less 200 feet away from the future CVC transfer station and Harvard Park is about one mile away.

Therefore, transforming these selected Clean CA location into attractive hot spot destination would not only create public spaces where residents feel proud to use, but is conveniently located close to public transportation so getting around from one outdoor activity to another, can be easy, convenient, and affordable.

Should there be any questions regarding our support or anything else related to TCAG’s current or future mobility plans, please do not hesitate to contact me at 559-623-0450 or [email protected].

Sincerely,
Theodore Smalley
Executive Director, Tulare County Association of Governments (TCAG) July 26, 2022 Regular Meeting of the Lindsay City Council

Page 227 ends

December 17, 2021
Joseph Tanner
City Manager
City of Lindsay
150 N Mirage Avenue
P.O. Box 369
Lindsay, CA 93247
Re: Caltrans CCLGP – Letter of Support for The Olive Bowl Park and Harvard Park Enhancements Project
Dear Mr. Tanner:

As the Assemblyman representing the 26th Assembly district in California, wherein Lindsay is located, I would like to offer my support to the City of Lindsay for the grant application from the California Department of Transportation (Caltrans), Clean California Local Grant Program (CCLGP), and specifically for funds which will go to local communities to beautify and improve local streets and roads, tribal lands, parks, pathways, and transit centers to clean and enhance public spaces.

It is my understanding that the City of Lindsay has identified The Olive Bowl Park and Harvard Park Enhancements as the collective project for the intended use of these funds. I applaud the City’s success in securing other funding sources for its efforts to improve public spaces for walking and recreation at Olive Bowl Park and Harvard Park, and given the vision behind the CCLGP, consider Lindsay the ideal intended recipient for these funds.

The Olive Bowl Park and Harvard Park Enhancements project represents an investment in the community that will do much to enhance public health, promote pride in public spaces, expand cultural connection, and encourage community placemaking within Lindsay. It will yield dividends for the City of Lindsay, its residents, visitors, and travelers within the City and along the I-65 corridor.

Sincerely,
Devon J. Mathis,
Assemblyman, 26th District
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 228 ends

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 229 ends

City of Lindsay
Agreement Number CCL-5189-035
AMS ADV ID: 622000165

Page 1 of 11 ends

Clean California Local Grant Program
(State)
Amendment to Grant Application
Amendment
Number_1_(“Amendment”)
This Amendment will commence on May 15, 2022, or upon approval by CALTRANS, whichever occurs later, and it amends the Grant Application submitted by City of Lindsay, hereinafter referred to as AGENCY, as set forth below:

Application
Section Original Text Amended Text

1.3 Total Project Cost - $4,650,920
California State Park Funds
Prop 68 - $3,670,437
Total Project Cost - $7,735,225
California State Park Funds Prop 68 -
$3,084,305
Attachment C
was updated
Only the work proposed to be
done using CCLGP funds was
listed
The total project cost estimate was
included.

In Witness Whereof, the parties hereto have executed this Amendment Number _1_ to the Grant Application on the day and year first herein above written:

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION
City of Lindsay
By: By:

Printed Name:

Gretchen Chavez
Printed Name:

Title:

Office Chief
Clean California Local Grant Program
Division of Local Assistance
Title:

Date: Date:

By:

Printed Name:

Title:

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 230 ends

City of Lindsay
Agreement Number CCL-5189-035
AMS ADV ID: 622000165

Page 2 of 11 ends

Date:

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 231 ends

Application Instructions for
Detailed Engineer's Estimate and Total Project Cost
• Applicants are expected to use this template for estimating/documenting the cost of construction items and the overall project costs. (participating & nonparticipating) •The Detailed Engineer's Estimate and Total Project Costs must tie to the information presented in the CCLGP Application Form. • Do NOT input values in gray cells. These cells are formula-driven and will automatically update.

Project (Engineer's) Information
• The Licensed Engineer in 'responsible charge' of the overall CCLGP application must review all information presented in this Estimate form and ensure the values are consistent with the corresponding plans included in the application. This requirement is considered necessary to ensure the CCLGP application meets the PSREquivalent requirements - including the use of construction items, quantities and unit prices that meeting industry standards for PSR-Equivalents. The engineer is also expected to review the breakdown of participating vs. non-participating costs shown in estimate and confirm they are consistent with Program Guidelines.

Engineer's Estimate & Cost Breakdown
For each construction item in this table, the following items must be filled:

Item: indicate the name of a construction item used in this project.

Quantity: indicate the total quantity of each construction item Units: indicate the units of measurement (i.e. Square Feet or SQFT.) Only use Lump Sum (LS) for items listed on the Allowable Lump Sum tab.

Unit Cost: indicate the unit cost for one quantity.

Total Item Cost will be automatically calculated once the above information are provided for each line item (row).

The Project Estimate form only has a limited number of lines. If your estimate has more items; you will have to combine similar items. If an applicant has already developed a complete estimate using another tool, the items can be grouped into sub-categories such as overhead, bike lanes, sidewalks, drainage, utilities etc., as long as the full estimate is attached to the estimate or with the application in the Additional Attachments section.

General Overhead:

Costs for these items have been separated out to reduce confusion relating to participating vs. non-participating costs calculations.

The % of participating vs. non-participating costs are automatically calculated based on the ratio of these costs for all of the other construction items.

Cost Breakdown
Participating Items/costs: these are expected to represent all scope of work construction items that are necessary for the purposes of beautifying and cleaning up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces. %- Insert the percentage of the total item cost that is directly attributed to "Participating items". $- This field will automatically calculate once a percentage is entered in the previous question.

Non-participating Items/costs: these are expected to represent all construction items that are not necessary for the purposes of beautifying and cleaning up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces.

Subtotals and Contingencies:

Subtotal of Construction Items: This field will automatically calculate the total of all construction items indicated above.

Construction Item Contingencies: Insert percentage of contingencies, which is intended to account for the cost of minor construction items not defined at the time the applications are prepared.

Total (Construction Items and Contingencies) Cost: This field will automatically calculate the total from all information indicated above.

Project Delivery Costs: The participating vs. non-participating split is automatically calculated for all Project Delivery Costs.

Project Approval & Environmental Document (PA&ED): Total cost of Environmental Studies and Permits phase of the project.

Plans, Specifications & Estimate (PS&E): Total cost of Plans, Specifications and Estimates phase of the project.

Total Preliminary Engineering (PE): This total is automatically calculated. Total of (PA&ED) + (PS&E) Note: Per the Caltrans Local Assistance Procedures Manual, the total cost for PE should not exceed 25%. All costs over the 25% must be shown in the application as non-participating.

Right of Way Engineering: Total cost of Right of Way Engineering, including obtaining the RW Certification.

Acquisitions and Utilities: Total cost of Acquisitions and Utilities.

Total RW: This total is automatically calculated. Total of (RW Eng.) + (Acq.&Utilities) Total Pre-Construction Costs: This total is automatically calculated. Total of (PE) + (RW) Construction Engineering (CE): Total cost of Construction Engineering. Note: Per the Caltrans Local Assistance Procedures Manual, the total cost for CE should not exceed 15%. All costs over the 15% must be shown in the application as non-participating.

Total Construction Costs: This total is automatically calculated. Total of (CE) + (Con. Item. & Contig.) Total Project Cost Estimate: The participating vs. non-participating split is automatically calculated for the Total Project Costs. • This is automatically calculated from all information entered above. • This value must represent the total estimated cost of the entire CCLGP project. • The application must account for the non-participating costs being funded with local funds. Because this local funding is considered non-participating, it cannot be considered leveraging or matching funding.

Documentation of Non-Participating Costs:

Non-participating Items/costs: these are costs for items outside of the program guidelines or necessary project parameters of proposed scope of work. Master plan or other activates not necessary for the purposes of beautifying and cleaning up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces are considered non-participating costs.

Engineers must present their logic and calculations for splitting the projects costs between participating and non-participating costs. 3 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 232 ends

Project Milestone
Project Study Report Approved
Begin Environmental (PA&ED) Phase
Circulate Draft Environmental Document
Draft Project Report
End Environmental Phase (PS&ED Milestone)
Begin Design Phase (Ready to List for Advertisement Milestone) Begin Right of Way Phase
End Right of Way Phase (Right of Way Certification Milestone) End Construction Phase (Construction Contract Acceptance Milestone) MUST BE NO LATER THAN 6/30/2024
Begin Closeout Phase
End Closeout Phase (Closeout Report) REPORTS AND FINAL INVOICES

MUST BE RECEIVED, APPROVED AND PROCESSED BY CALTRANS BY 12/31/24
4 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 233 ends

Date Total Cost
5 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 234 ends

Project Information:

Agency: Date:

Project Description:

Project Title
Project Location:

License #: 41964
Engineer's Estimate and Cost Breakdown:

Cost Breakdown
Engineer's Estimate (for Construction Items Only) CCLGP Participating CCLGP Non-participating Costs/Items Costs/Items
Item
No. Item Quantity Units Unit Cost TotalItem Cost % $ % $ General Overhead-Related Construction Items
1 Mobilization & Demobilization 1 LS $200,000.00 $200,000 100% $200,000 General Construction Items
1 Clear and Grub Softscape 352,196 SF $0.25 $88,049.00 100% $88,049 2 Existing Trees 27 EA $500.00 $13,500.00 100% $13,500
3 Existing Sidewalk 1 LS $20,000.00 $20,000.00 100% $20,000 4 Existing Playground (Equipment, footings and surfacing) 1 LS $8,000.00 $8,000.00 100% $8,000 5 Existing Electrical Poles 1 LS $15,000.00 $15,000.00 100% $15,000 6 Existing Ballfields (All associated fencing, gates, dugouts, b k t bl h t t ) 1 LS $35,000.00 $35,000.00 100% $35,000 7 Excavation & Grading 13,000 CY $10.00 $130,000.00 100% $130,000 8 Construct Subgrade, Fine Grade and Soil Preparation for Ball 162,247 SF $0.30 $48,674.10 100% $48,674 9 Construction staking and surveying 1 LS $30,000.00 $30,000.00 100% $30,000 10 Erosion Control 1 LS $12,000.00 $12,000.00 100% $12,000 11 SWPPP Preparation and 1 Allow $5,000.00 $5,000.00 100% $5,000 12 Field #1 (288'/300'/300') - LED Lighting 1 LS $436,000.00 $436,000 100% $436,000 13 Field #2 and Field #3 LED Lighting 2 EA $195,000.00 $390,000 100% $390,000 14 Walkway - LED Lights 1 LS $360,000.00 $360,000 100% $360,000 15 Parking Lot - LED Lights 1 LS $54,000.00 $54,000 100% $54,000 16 Power for the Booster Pump and
Irrigation Controllers 1 LS $31,000.00 $31,000.00 100% $31,000 17 Security/Surveillance System 1 LS $133,000.00 $133,000.00 100% $133,000 18 Power for the Concession/Storage
Building 1 LS $28,000.00 $28,000.00 100% $28,000
19 Power for the Existing Restroom
Building and other loads to remain 1 LS $38,000.00 $38,000.00 100% $38,000 20 Main Switchboard MSA/MSB 1 LS $132,000.00 $132,000.00 100% $132,000 21 Switchboard B and Power for the New Restroom Building 1 LS $80,000.00 $80,000.00 100% $80,000 22 Primary and secondary service conduits 1 LS $25,000.00 $25,000.00 100% $25,000 23 Telephone service conduit 1 LS $8,000.00 $8,000.00 100% $8,000 24 Backstop Receptacles 1 LS $22,000.00 $22,000.00 100% $22,000 25 Electrical demolition 1 LS $25,000.00 $25,000.00 100% $25,000 26 Storm Drain HDPE (4"-18") 3,000 LF $60.00 $180,000.00 100% $180,000 27 Sewer Manhole 1 EA $6,000.00 $6,000.00 100% $6,000
28 12"x12" Drop Inlet 25 EA $60.00 $1,500.00 100% $1,500 29 Storm Drain Manhole 3 EA $6,000.00 $18,000.00 100% $18,000 30 Sewer PVC Pipe (4") 100 LF $64.00 $6,400.00 100% $6,400 31 Domestic Water Pipe (3") 600 LF $64.00 $38,400.00 100% $38,400 32 Fire Water Pipe (6") 30 LF $64.00 $1,920.00 100% $1,920 33 Fire Hydrant 1 EA $4,200.00 $4,200.00 100% $4,200
34 Concrete paving 4", natural grey,
broom finish 39,728 SF $7.50 $297,960 100% $297,960
35 Concrete paving 7" at vehicular area,
natural grey, broom finish 4,518 SF $10.00 $45,180 100% $45,180 36 Asphalt concrete paving 8,654 SF $3.50 $30,289 100% $30,289 37 Stabilized Decomposed Granite 20,135 SF $4.00 $80,540 100% $80,540 38 Play Area Curb 460 LF $30.00 $13,800 100% $13,800
39 6" Concrete Mow Curb 1,552 LF $12.00 $18,624 100% $18,624 40 Foul ball poles, 30'-0" high - At Field
#1 2 EA $1,800.00 $3,600.00 100% $3,600
41 Safety net 30' high - At Field #1 east
side 362 LF $280.00 $101,360.00 100% $101,360
42 Aluminum Spectator Bleachers (4- Row) 2 EA $14,254.00 $28,508.00 100% $28,508 43 Aluminum Spectator Bleachers (2- Row) 4 EA $8,500.00 $34,000.00 100% $34,000 44 Electronic Scoreboards 1 EA $14,000.00 $14,000.00 100% $14,000 45 Bat rack 6 EA $615.00 $3,690.00 100% $3,690
46 Aluminum Players Bench 6 EA $1,800.00 $10,800.00 100% $10,800 47 Field #1 - 30' H Chainlink backstop w/ 8' Overhang 1 EA $25,000.00 $25,000.00 100% $25,000 48 2" x 10" Plastic Lumber @ Field #1
30' Back Stop. Fields #2 and #3 20' Backstops. 198 LF $45.00 $8,910.00 100% $8,910 49 Field #2 and #3 - 20' Back Stop 2 EA $15,000.00 $30,000.00 100% $30,000 50 8'-0" high Chainlink fencing - Field #1 side lines and outfield 989 LF $110.00 $108,790.00 100% $108,790 51 6'-0" high Chainlink fencing - Field
#1 bull pens and dugouts 282 LF $1.00 $282.00 100% $282 52 6'-0" high Chainlink fencing - Fields #2 and #3 side lines, outfield and dugouts 1,605 LF $80.00 $128,400.00 100% $128,400 53 Chainlink Gates , Single, 4' Wide 20 EA $3,300.00 $66,000.00 100% $66,000 54 (8'h x 8'w)Chainlink gates, double - Field #1 1 EA $5,000.00 $5,000.00 100% $5,000 55 (6'h x 8'w)Chainlink gates, double - Fields #2 and #3 2 EA $4,800.00 $9,600.00 100% $9,600 56 (8'h x 12'w)Chainlink gates, double - Field #1 1 EA $6,400.00 $6,400.00 100% $6,400 57 (6'h x 12'w)Chainlink gates, double - Fields #2 and #3 3 EA $5,600.00 $16,800.00 100% $16,800 58 Decomposed granite, Infield Mix -
fields #1, #2 and #3 97,457 SF $2.50 $243,642.50 100% $243,643 59 Turf (Seed Ballfield) 114,152 SF $0.25 $28,538.00 100% $28,538 60 9" Concrete Mow Curb at Fencing in turf areas 1,733 LF $16.50 $28,594.50 100% $28,595 Detailed Engineer's Estimate and Total Project Costs
Important: Read the Instructions in the first sheet (tab) before entering data. Do not enter data in shaded fields (with formulas).

Olive Bowl Renovation
City of Lindsay
Olive Bowl Renovation/Kaku Park Expansion
18 N Olive Ave
Name of Licensed Engineer in responsible charge of preparing or reviewing this PSR-Equivalent Cost Estimate: Jeff Cowart 6/21/2022
6 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 235 ends

Project Information:

Agency: Date:

Project Description:

Project Title
Project Location:

License #: 41964
Detailed Engineer's Estimate and Total Project Costs
Important: Read the Instructions in the first sheet (tab) before entering data. Do not enter data in shaded fields (with formulas).

Olive Bowl Renovation
City of Lindsay
Olive Bowl Renovation/Kaku Park Expansion
18 N Olive Ave
Name of Licensed Engineer in responsible charge of preparing or reviewing this PSR-Equivalent Cost Estimate: Jeff Cowart 61 Drinking fountains 2 EA $4,500.00 $9,000.00 100% $9,000 62 Trash receptacles 20 EA $800.00 $16,000.00 100% $16,000 63 Picnic Table ADA 8' Long 8 EA $1,600.00 $12,800.00 100% $12,800 64 Picnic Table Standard 8' Long 12 EA $1,400.00 $16,800.00 100% $16,800 65 BBQ 7 EA $500.00 $3,500.00 100% $3,500
66 Entry Monument 1 EA $8,000.00 $8,000 100% $8,000
67 Play Area Engineered Wood Fiber
(12" Depth) 8,154 SF $4.00 $32,616.00 100% $32,616
68 ADA Ramps into Play Area 2 EA $1,200.00 $2,400.00 100% $2,400 69 2-Bay Trash Enclosure 1 EA $15,000.00 $15,000.00 100% $15,000 70 30x44' Steel Hip Shelter 1 EA $ 100,000.00 $15,001.00 100% $15,001 71 50' H. Flagpole 1 EA $5,000.00 $5,000.00 100% $5,000 72 15 Gal. Trees 42 EA $100.00 $4,200 100% $4,200
73 24" Box Trees 30 SF $350.00 $10,500 100% $10,500
74 Soil Preparation for planting areas 6,000 SF $0.60 $3,600 100% $3,600 75 Soil Preparation for turf (Passive Areas) 67,347 SF $0.60 $40,408 100% $40,408 76 Turf (Seed) (Passive Areas) 67,347 SF $0.25 $16,837 100% $16,837 77 Booster Pump 1 allow $60,000.00 $60,000 100% $60,000 78 Irrigation Ballfields 97,457 SF $1.50 $146,186 100% $146,186 79 Ballfield Infield Rotors 1 LS $12,000.00 $12,000 100% $12,000 80 Tree Irrigation (Bubblers) 72 EA $150.00 $10,800 100% $10,800 81 Irrigation for Turf (Passive Areas) 67,347 SF $1.85 $124,592 100% $124,592 82 Maintenance and Plant establishment Period (Working Day) 60 WD $500.00 $30,000 100% $30,000 83 Play Equipment 2 EA $300,000.00 $600,000 100% $600,000 84 Playground Surfacing 1 EA $200,000.00 $200,000 100% $200,000 85 Play Equipment Shade Structure 2 EA $100,000.00 $200,000 100% $200,000 86 Exercise Circuit Training 1 LS $100,000.00 $100,000 100% $100,000 87 Skatepark 8000 SF $50.00 $400,000 100% $400,000
88 Wayfinding Signs 5 EA $5,000.00 $25,000 100% $25,000 89 Restroom/Concession/Storage BLDG 2 EA $350,000.00 $700,000 100% $700,000 Subtotal of Construction Items: $6,832,191 $6,832,191
$191,301 $191,301
$7,023,492 $7,023,492
Project Delivery Costs:

Type of Proje Cost $
CCLGP Participating Costs CCLGP Non-participating Costs $200,000 "PE" costs / "CON" costs
$ 200,000 $200,000 2.85% 25% Max
$150,000
$ 150,000 $150,000
$350,000 $350,000
Construction Engineering (CE) "CE" costs / "CON" costs
$361,734 5.2% 15% Max
$7,385,225 $7,385,225
CCLGP Participating Costs Non-participating Costs
$7,735,225
Documentation of Non-Participating Costs:

Separate logic is required for each item which is partly a participating cost for CCLGP funding or is required for the construction of a non-participating item/element of the project.

Item #: Description of Engineer's Logic: (See examples shown in the Instructions) g g p g
CCLGP-Participating and Non-participating costs must be documented $ -
$ 150,000.00
$ 200,000
$7,735,225
$ 361,734
Total PE:

Right of Way Engineering:

Acquisitions and Utilities:

Total RW:

Right of Way (RW)
Construction Engineering (CE):

Total Construction Costs:

Total Project Cost:

Total Pre-Construction Costs (PE+RW):

Environmental Studies and Permits(PA&ED):

Plans, Specifications and Estimates (PS&E):

Preliminary Engineering (PE)
Construction Item Contingencies (2.8% of Construction Items):

Total (Construction Items & Contingencies) cost:
6/21/2022 2 of 2
7 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 236 ends

Item Description- Common Unit Pay

CLEARING AND GRUBBING LS

CONSTRUCTION AREA SIGNS LS

CONSTRUCTION SURVEY/STAKING LS

DEVELOP WATER SUPPLY LS

DUST CONTROL LS

EROSION CONTROL LS

FINISHING ROADWAY LS

JOB SITE MANAGEMENT LS

MITIGATION LS

MOBILIZATION LS

MOBILIZATION, DEMOBILIZATION, AND FINAL CLEANUP LS

PERMITS LS

PREPARE STORM WATER POLLUTION PREVENTION PLAN LS

PREPARE WATER POLLUTION CONTROL PROGRAM LS

RAILROAD FLAGGING & MISCELLANEOUS LS

RE OFFICE LS

SIGNS LS

STRIPING LS

TRAFFIC CONTROL SYSTEM LS

TRAFFIC MANAGEMENT PLAN LS
Item Description- Not common Unit Pay

ABANDON SEWER LS

ADL BURIAL LOCATION REPORT LS

ASBESTOS COMPLIANCE PLAN LS

AUTOMATED WORK ZONE INFORMATION SYSTEM LS

BOOSTER PUMP LS

BRIDGE REMOVAL LS

BUILDING WORK LS

CAMERA SYSTEMS LS

CERTIFY EXISTING BACKFLOW PREVENTERS LS

CHANGEABLE MESSAGE SIGN SYSTEM LS

CHECK AND TEST EXISTING IRRIGATION FACILITIES LS

CLEAN AND PAINT BRIDGE RAILING LS

CLEAN AND PAINT STEEL SOLDIER PILING LS

CLEAN AND PAINT STRUCTURAL STEEL LS

CLEAN AND PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS

CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS

CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS

CONTROL AND NEUTRAL CONDUCTORS LS

CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD) LS

DATA CORE LS

DRAINAGE PUMPING EQUIPMENT LS

DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS) LS

DUST PALLIATIVE LS

ELECTRIC SERVICE FOR BOOSTER PUMP LS

ELECTRIC SERVICE FOR IRRIGATION LS

FIBER OPTIC CABLE SYSTEMS LS

FISH PROTECTION LS

FLASHING BEACON SYSTEM LS

HEALTH AND SAFETY PLAN LS

INDUCTIVE LOOP DETECTOR (LS) LS

INTELLIGENT COMPACTION LS

INTERCONNECTION CONDUIT AND CABLE (LS) LS

INVASIVE SPECIES CONTROL LS
8 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 237 ends

IRRIGATION WATER SERVICE CHARGES LS

JACKING SUPERSTRUCTURE LS

LEAD COMPLIANCE PLAN LS
LIGHTING SYSTEM-(Electroliers are a separate item (EA)) LS

MAINTAIN EXISTING PLANTED AREAS LS

MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING

CONSTRUCTION
LS

MIX DESIGN (FULL DEPTH RECLAMATION-FOAMED ASPHALT) LS

MIX DESIGN (FULL-DEPTH RECLAMATION-CEMENT) LS

MOBILIZATION (MARINE ACCESS) LS

MODIFY BRIDGE RAILING (LS) LS

MODIFY PUMP PLANT LS

MODIFYING EXISTING ELECTRICAL SYSTEM LS

MONITOR WELL LS

NATURAL RESOURCE PROTECTION PLAN LS

NOA BURIAL LOCATION REPORT LS

NOISE MONITORING LS

OPERATE EXISTING IRRIGATION FACILITIES LS

PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS

PERMANENT EROSION CONTROL ESTABLISHMENT WORK LS

PLANT ESTABLISHMENT WORK LS

PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS

PREPAVING INERTIAL PROFILER LS

PRESTRESSING LS

PRESTRESSING CAST-IN-PLACE CONCRETE LS

PRESTRESSING PRECAST GIRDER LS

PRESTRESSING STEEL GIRDERS LS

PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS

PRUNE EXISTING PLANTS LS

PUBLIC SAFETY PLAN LS

PUMPING PLANT ELECTRICAL EQUIPMENT LS

PUMPING PLANT EQUIPMENT LS

RADAR SPEED FEEDBACK SIGN SYSTEMS LS

RAMP METERING SYSTEM LS

RECONSTRUCT DRAINAGE FACILITY (LS) LS

RECONSTRUCT FENDER LS

RECYCLED WATER IDENTIFICATION AND WARNING SIGNS LS

REMOVE CONCRETE (LS) LS

REMOVE CONCRETE (MISCELLANEOUS) (LS) LS

REMOVE CONCRETE CURB (LS) LS

REMOVE DOWNDRAIN (LS) LS

REMOVE DRAINAGE FACILITY (LS) LS

REMOVE IRRIGATION FACILITY LS

REMOVE RAILING LS

REMOVE REINFORCED CONCRETE BOX CULVERT (LS) LS

REMOVE RETAINING WALL (LS) LS

REMOVE RETAINING WALL (PORTION) (LS) LS

REMOVE SIGN STRUCTURE (LS) LS

REMOVE SIGN STRUCTURE WALKWAY (LS) LS

REMOVE SLOPE PAVING (LS) LS

REMOVE SOUND WALL (LS) LS

REMOVING EXISTING ELECTRICAL SYSTEM LS

ROADSIDE CLEARING LS

SALVAGE IRRIGATION FACILITY LS

SAMPLING AND ANALYSIS PLAN (NATURALLY OCCURRING ASBESTOS) LS 9 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 238 ends

SIGN ILLUMINATION SYSTEM LS

STAIN GALVANIZED SURFACES (LS) LS

STRAY CURRENT PROTECTION (BRIDGE) LS

STREET SWEEPING LS

TEMPORARY ACTIVE TREATMENT SYSTEM LS

TEMPORARY CONCRETE WASHOUT LS

TEMPORARY CONSTRUCTION MAT (LS) LS

TEMPORARY CREEK DIVERSION SYSTEMS LS

TEMPORARY DECKING LS

TEMPORARY FLASHING BEACON LS

TEMPORARY LIGHTING SYSTEM LS

TEMPORARY PEDESTRIAN ACCESS ROUTE LS

TEMPORARY SHORING LS

TEMPORARY SIGNAL AND LIGHTING LS

TEMPORARY SIGNAL SYSTEM LS

TEMPORARY SUPPORT LS

TIME-RELATED OVERHEAD (LS) LS

TRAFFIC MONITORING STATION SYSTEM LS

WATER METER CHARGES LS

WATER SUPPLY SYSTEM LS

WELL DEVELOPMENT LS

WORK AREA MONITORING (BRIDGE) LS
10 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 239 ends

ea
te OLIVE BOWL/KAKU PARK RENOVATION PROJECT
EntCITY OF LINDSAY
Enter the name of the Project Lead in cell B3.
e
Di 1
lls
is
ro

TASK ASSIGNED

TO PROGRESS START END
ll
B8 Design Phase
ll
B9 Issue Contract MIG, INC 100% 5/10/22 5/16/22
o
w 90% Plan Redesign MIG, INC 60% 6/1/22 6/6/22
90% Plan Submittal & Approval MIG, INC 0% 6/6/22 6/11/22 100% Plans Submittal & Approval MIG, INC 0% 6/11/22 6/16/22 Specifications Submittal & Approval MIG, INC 0% 6/2/22 6/7/22 e
ce Bidding Phase
Advertising PS&E CITY 0% 6/3/22 6/7/22
Open & Review Bids CITY 0% 6/5/22 6/10/22
Award Contract CITY 0% 6/10/22 6/13/22
Notice to Proceed CITY 0% 6/10/22 6/12/22
Sam Construction Phase
Mobilization & Demobilization Contractor 4/1/23 4/15/23 Demolition Contractor 4/17/23 4/29/23
Earthwork/Site Grading Contractor 5/1/23 5/27/23
Site Electrical Contractor 5/29/23 7/8/23
Site Utilities Contractor 6/19/23 8/2/23
Irrigation Contractor 7/31/23 9/9/23
Restrooms/Consession Building Contractor 9/11/23 11/4/23 Paving/Concrete Contractor 8/11/23 8/30/23
Planting Contractor 8/14/23 9/29/23
Ballfields Contractor 9/2/23 12/8/23
Playground Contractor 10/30/23 11/24/23
Skatepark Contractor 9/2/23 1/26/24
Site Amenities Contractor 11/27/23 1/12/24
Sam Closeout
Accept Project As Completed City 1/8/24 2/9/24
Final Payment City 2/9/24 3/1/24
Reports City 3/1/24 6/29/24
This is an empty row
is
ro
Insert new rows ABOVE this one
Project Start:

Display Week: Jun 1, 2023 Jul 1, 2023 Aug 1, 2023 Sep 1, 2023 Nov 1, 2023 Dec 1, 2023 Jan 1, 2024 Feb 1, 2024 Mar 1, 2024 Apr 1, 2024 May 1, 2024 Jun 1, 2024 Fri, 4/1/2022
May 1, 2022 Jun 1, 2022 Jul 1, 2022 Aug 1, 2022 Sep 1, 2022 Oct 1, 2022 Nov 1, 2022 Dec 1, 2022 Jan 1, 2023 Feb 1, 2023 Mar 1, 2023 Apr 1, 2023 May 1, 2023 Oct 1, 2023 11 of 11
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 240 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-44

Page 1 of 2 ends

NUMBER 22-44
TITLE

MEETING

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINDSAY

AUTHORIZING THE CITY MANAGER TO EXECUTE AGREEMENTS

WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION FOR

THE CITY OF LINDSAY OLIVE BOWL RENOVATION/KAKU PARK

EXPANSION PROJECT

At a regularly scheduled meeting of the City of Lindsay City Council held on July 26, 2022, at 6:00 PM at 251 E. Honolulu Street, Lindsay, CA 93247 WHEREAS, the City Council of the City of Lindsay is eligible to receive State funding for certain transportation related work through the California Department of Transportation; and WHEREAS, a Restricted Grant Agreement is needed to be executed with the California Department of Transportation before such funds can be claimed through the Clean California Local Grant Program; and
WHEREAS, the City of Lindsay wishes to delegate authorization to execute these agreements and any amendments thereto.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LINDSAY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. The City Council of the City of Lindsay authorizes the City Manager, or designed, to execute all Restricted Grant Agreements and any amendments thereto with the California Department of Transportation.

PASSED AND ADOPTED by the City Council of the City of Lindsay as follows:

MEETING DATE July 26, 2022
MOTION

SECOND MOTION
AYES
ABSENT

ABSTAIN
NAYS
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 241 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-44

Page 2 of 2 ends

CERTIFICATION OF THE FOREGOING RESOLUTION AS FULL, TRUE, PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF LINDSAY AS DETAILED.

FRANCESCA QUINTANA RAMONA CAUDILLO

CITY CLERK MAYOR
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 242 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Rick Carrillo, Director of Public Safety
Mari Carrillo, Human Resources Manager
DEPARTMENT: Public Safety, Human Resources
ITEM NO.: 9.7
MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Consider Minute Order Approval of Job Description for the Community Service Officer (CSO) Job Position.

BACKGROUND | ANALYSIS
The Community Service officer will work under the broad direction of Public Safety Police Officers, Sergeants, and Lieutenants. If the Community Service Officer (CSO) job description is approved, the City intends to begin internal recruitment efforts for one (1) Community Service Officer (CSO). In addition to the essential duties and responsibilities as described in the CSO job description, this employee will be cross trained to perform in multiple capacities. This position will focus on the fields of Animal Control and Community Services. City Staff has identified the need for a full-time Community Service Officer to perform Animal Control and Community Services.

Staff recommends that Council approve the Community Service Officer job description so that staff may begin the internal recruitment process.

The essential duties and responsibilities of the Community Service Officer include, but are not limited to:
• Performs a variety of professional, non-emergency, uniformed law enforcement support duties, crime prevention, parking enforcement and animal control duties. • Take and prepare a variety of reports and may assist with traffic control. • Interview residents of the community and prepare reports on accidents, offenses, and incidents. • Assists with crime prevention within the community with programs and projects. • Responds to radio dispatched calls for service to assist with investigations.

It is the policy of the City of Lindsay to screen for any potential conflicts of interest in the recruitment process and adequately mitigate against the appearance of any bias, real or perceivable.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 243 ends

STAFF REPORT

Page 2 ends

FISCAL IMPACT
This position would hold an annual salary of $41,766 – 55,973. The salary and benefits for this position would be sourced from 101-GENERAL FUND.

ATTACHMENTS
• Community Service Officer Job Description
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 244 ends

City of Lindsay
Job Description
Community Service Officer

Page 1 ends

Class Title: Community Service
Officer
Salary: $41,766-55,973 Annually
$20.08-26.91 Hourly
Department: Public Safety Step Range: 1-7
Location: 185 N. Gale Hill Ave.

Lindsay, CA. 93247
Status: Full-time/Non-Exempt
Date: MM/DD/YYYY Union: MISC EMPLOYEE /SEIU
GENERAL PURPOSE:

Under general supervision, performs a variety of professional, non-emergency, uniformed, law enforcement support duties, crime prevention, parking enforcement and animal control duties, take and prepare a variety of reports, may assist with traffic control; utilizes knowledge of multiple ordinances, regulations and codes; performs independent field patrol duties; and other related duties as required.

SUPERVISION RECEIVED:

Works under the close supervision of the Police Officers, Sergeants, or Lieutenants.

SUPERVISION EXERCISED:

May supervise juveniles and adults assigned to perform community services.

ESSENTIAL DUTIES AND RESPONSIBILITIES:
• Interview residents of the community and prepare reports on accidents, offenses and incidents. • Assist in controlling traffic at emergency and collision scenes. • Assists with crime prevention within the community with programs and projects. • Responds to radio dispatched calls for service to assist with investigations. • Responds to resident calls for service.
• Process crime scenes by means of photographs, evidence collection and latent print identification. • Assists and provides information to motorists and the general public. • Enforces parking regulations and impounds or stores motor vehicles. • Operates computers, printers to enter and modify a variety of police records and reports. • Compile, tabulate and verify statistical data and reports. • May perform police records duties as necessary.
• May assist in live-scan fingerprinting for applicants. • May administer first aid as necessary.
• Performs non-emergency law enforcement duties as assigned. • Must maintain prompt and regular attendance.
• Perform animal control duties.
• Collect carcasses of animals for proper and humane disposal. • Collect, assess, properly care for and storage of live animals. • Provide public education of animal control related codes and ordinances. • Conduct animal control related investigations into reported bite reports; appears in court to testify.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 245 ends

City of Lindsay
Job Description
Community Service Officer

Page 2 ends

• Patrols assigned areas; pursues animals by vehicle and on foot. • Captures and impounds unlicensed, diseased, stray, and vicious animals. • Examines captured animals for illness or injury.
• Handles and properly transports sick or injured animals to a veterinarian for medical treatment.
• Maintains records and files of the Kennels and the animals housed there; logs all incidents concerning animal control.
• May perform related duties as required.

PERIPHERAL DUTIES:
• Serves as a member of various employee committees.
• Maintains departmental equipment, supplies and facilities. • May work various shifts to handle difficult and emergency situations.

MINIMUM QUALIFICATIONS:
• Must be 21 years or older at the time of employment.
• Must possess, or be able to obtain by time of hire, a valid State driver's license without record of suspension or revocation in any State.

Education and Experience:
• Graduation from a high school or GED equivalent;
• Two years’ experience related to inspection, law enforcement, animal handling experience, public administration or a related field, or
• Any equivalent combination of education and experience. • 832PC Arrest course certificate desirable; or ability to obtain certificate.

Necessary Knowledge, Skills and Abilities:
• Some knowledge of law enforcement principles, procedures, techniques, and equipment; working knowledge of animal restraint and care techniques. • Some skill in operating the tools and equipment required to execute duties. • Ability to learn the applicable laws, ordinances, and department rules and regulations. • Ability to communicate effectively orally and in writing • Ability to establish and maintain effective working relationships with subordinates, peers, supervisors, and the public.
• Ability to exercise sound judgment in evaluating situations and in making decisions. • Ability to follow verbal and written instructions.
• Ability to learn the geography of assigned areas.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 246 ends

City of Lindsay
Job Description
Community Service Officer

Page 3 ends

TOOLS AND EQUIPMENT USED
Personal computer, including word processing and data base software; motor vehicle; phone; mobile or portable radio, breathalyzer, pager, first aid equipment copy and fax machine.

PHYSICAL DEMANDS
The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

While performing the essential functions of this position the employee is regularly required to stand, walk, reach with hands and arms, climb, balance, stoop, kneel, crouch, crawl, lift and/or move up to 100 lbs.; frequently exposed to fumes, odors, airborne particles, toxic or caustic substances, excessive noise, temperature extremes, vehicular traffic, dampness/humidity, confrontational persons, animals, and various forms of farm animals or wildlife.

WORK ENVIRONMENT
The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. While performing the duties of this job, the employee occasionally works in outside weather conditions. The employee occasionally works in high, precarious places and is occasionally exposed to wet and/or humid conditions, fumes or airborne particles, toxic or caustic chemicals, risk of electrical shock, and vibration. The noise level in the work environment is usually moderate.

SELECTION GUIDELINES & APPLICATION PROCESS:

Formal employment application must be submitted, rating of education and experience; oral interview, and reference check; job related tests may be required. The duties listed above are intended only as illustrations of the various types of work that may be performed. The omission of specific statements of duties does not exclude them from the position if the work is similar, related or a logical assignment to the position. The job description does not constitute an employment agreement between the employer and employee and is subject to change by the employer as the needs of the employer and requirements of the job change.

Appointment is subject to successfully passing a pre-employment physical, live-scan, background, and extensive criminal background history check. Before starting work, applicants must present documentation of their identity, authorization to work in the United States and a DMV driving record. Following appointment, a 12-month probationary period may be required as the final phase of the appointment process.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 247 ends

City of Lindsay
Job Description
Community Service Officer

Page 4 ends

BENEFITS:
10 Vacation Days, 13 Holidays, 10 Sick Leave days, 100% Employee Only Medical, Dental and Vision Plans, Life Insurance, Members of the California Employees’ Retirement (Cal Pers) (Classic and PEPRA tiers depending on hire date) Deferred Comp City Match (Up to 3%), Aflac and Cafeteria Plan. Please view the City of Lindsay website Human Resource page for further benefit details.

COVID-19 CONSIDERATIONS:

Protecting the health and safety of our communities including our teams and of those considering a career with the City of Lindsay is our highest priority. We continue to closely monitor the evolving situation and we appreciate your understanding and flexibility with any related changes to our interviewing process. Those selected to interview will be contacted via email with instructions on the interview process. The City of Lindsay is committed to doing everything we can to keep our staff and community safe and it will continue to adhere to all CAL/OSHA COVID19 Emergency Temporary Standards.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 248 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Joseph M. Tanner, City Manager
DEPARTMENT:

ITEM NO.:

City Manager

9.8 MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Consider Minute Order Approval of a Water Rebate Efficiency Program for City of Lindsay Water Rate Payers.

BACKGROUND | ANALYSIS
The State of California, Tulare County and City of Lindsay have been severely impacted by the on-going drought. Based on the City’s water allocation from the Friant-Kern Canal and limited number of water sources, it is in the City’s best interest to promote water conservation for all residents. To help promote awareness and reduce water usage, Staff is recommending the approval of a Water Rebate Efficiency Program for all residential water rate payers.

An outline of the program is provided below.
• Program Offerings
o Shower Heads – the City will purchase water efficient shower heads to give away (free of charge) to Lindsay residents. Shower heads will be available in the Finance Department and Wellness Center for anyone who makes a request. There will be a limit of three (3) per customer.
o Turf Rebates – Grass to artificial turf or drought resident landscaping.  $2.00 per square foot
 Minimum 20 square feet
 Maximum 400 square feet
o Toilet Replacement/Upgrade – $35.00 per unit
• Eligibility
o Must be a City of Lindsay water account holder to receive rebate. o May combine rebates for one account.
o Existing residential homes only.
o Property owner or permission from the property owner must be obtained. • General
o Proof of purchase is required for all devices. Proof of purchase must include the date, retailer name and information, item information including thorough description, and ideally model number and price.
o All items must be for the account holder’s address.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 249 ends

STAFF REPORT

Page 2 ends

o The City is not responsible for any damage to devices, property, or injury. All will be on the account holder.
o Account holder must receive all required permits.
o An inspection is required before and after equipment or improvement is installed. o Manufacturer’s installation and maintenance instructions must be followed. o Any disputes will be decided by the City Manager.

Please Note: If a City of Lindsay employee applies for the program, they will be subject to the same application process and a copy of their application, whether approved or denied, will be forwarded to the City Clerk to ensure compliance with program guidelines.

FISCAL IMPACT
Staff recommends allocating $15,000 for the program. The funds will be taken from the City’s General Fund. After June 30, 2023, or the $15,000 is spent, the program will end.

ATTACHMENTS
• City of Lindsay Water Efficiency Rebate Program Application Application
• The property
owner fills out
the paper
work and
submits it the
City.

Inspection
• An inspectioin
is done by
staff to verify
size of turf or
improvment
needed.

Installation
• Account
holder is
responsible
for
installation
and permits.

Inspection &
Sign off
• Staff inpects
the property
and verifies
items were
instaflled and
permit was
issued.

Finance Cuts
check
• Finance
receives
notice to cut
the check for
the approite
amount.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 250 ends

1 City of Lindsay
Water Efficiency Rebate
Program
Application
Applicant Information
Full Name: Date:

Last First M.I.

Address:

Street Address Apartment/Unit #
City State ZIP Code
Phone: Email
Account Number:

Do you work for the City of Lindsay?
YES NO
Are you applying for the Turf rebate?
YES NO
Are you applying for the Toilet rebate?
YES NO
Disclaimer and Signature
I certify that my answers are true and complete to the best of my knowledge. I understand that providing false or misleading information in my application may result in its cancellation.

Signature: Date:

City Staff Only
First Inspection completed by: ____________________________ Date: _______________________
Square Footage of Turf: ________
Number of Toilet Replacement/Upgrade: ________
Notes:__________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ Final Inspection Completed by: ___________________
Date: _______________________
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 251 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Nicholas Nave, Public Safety Lieutenant
DEPARTMENT: Public Safety
ITEM NO.: 9.9
MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Consider Approval of Resolution 22-45, A Resolution of the City Council of the City of Lindsay Identifying and Approving the Terms and Conditions for Out of Jurisdiction Mutual Aid Under the California Fire Assistance Agreement.

BACKGROUND | ANALYSIS
In compliance with the Agreement for Local Government Fire and Emergency Assistance to the State of California and Federal Agencies, known as the California Fire Assistance Agreement (CFAA), the Lindsay Department of Public Safety must have on file a Governing Body Resolution identifying the terms and conditions for fire department response outside of their jurisdiction. If the city does not have a Governing Body Resolution on file with the CFAA, the City of Lindsay will not be reimbursed for such mutual aid for all future fire incident assistance. Member agencies of the CFAA include the California Department of Forestry and Fire Protection, California Bureau of Land Management, California Bureau of Indian Affairs, USDA Forest Service, National Park Service, California Department of Fish and Wildlife. It is recommended that the City Council approve the Governing Body Resolution No. 22-45 attached to this staff report. There is currently no agreement between Cal OES and the City. Mutual Aid is covered by the State’s Master Mutual Aid Agreement. Resolution 22-45 simply allows the City to recover all the costs with sending equipment and personnel out of the City, instead of being liable for about 33% of the cost. This Resolution does not mandate that we send resources when called, as we can still refuse due to the needs of the City and its Residents.

Resolution 22-45 identifies and makes the following findings listed below.

1. Identifies the terms and conditions for reimbursement under the California Fire Assistance Agreement when the Lindsay Department of Public Safety- Fire Services Division is assigned to an emergency incident as recognized in the California Fire Assistance Agreement

2. Finds that personnel shall be compensated according to a Memorandum of Understanding, Personnel Rules and Regulations, and/or another directive that identifies personnel compensation in the workplace
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 252 ends

STAFF REPORT

Page 2 ends

3. Finds that in the event a personnel classification does not have an assigned compensation rate, a “Base Rate” as set forth in an organizational policy, administrative directive or similar document will compensate such personnel

4. Finds that the Lindsay Department of Public Safety- Fire Services Division will maintain a current salary survey or acknowledgement of acceptance of the “Base Rate” on file with the California Governor’s Office of Emergency Services, Fire Rescue Division

5. Finds that fire suppression personnel and non-fire suppression personnel will be compensated (portal to portal) beginning at the time of dispatch to the return to jurisdiction when equipment and personnel are in service and available for agency response

6. Finds that fire department response personnel include Director of Public Safety, Public Safety Lieutenant, Fire Lieutenant, Fire Apparatus Engineer, Firefighter, Public Safety Officers, Financial and Support Staff.

The Department of Public Safety staff respectfully recommends that the City Council pass and adopt Resolution 22-45.

FISCAL IMPACT
Resolution 22-45 enables full (Portal to Portal) reimbursement under the terms and conditions of the California Fire Assistance Agreement. Without the Resolution, the City of Lindsay will not be reimbursed for recognized mutual aid costs.

ATTACHMENTS
• CalOES Salary Survey
• Resolution No. 22-45

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 253 ends

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 254 ends

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 255 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-45

Page 1 of 3 ends

NUMBER 22-45
TITLE

MEETING

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

LINDSAY IDENTIFYING AND APPROVING THE TERMS AND

CONDITIONS FOR OUT OF JURISDICTION MUTUAL AID UNDER

THE CALIFORNIA FIRE ASSISTANCE AGREEMENT
At a regularly scheduled meeting of the City of Lindsay City Council held on July 26, 2022, at 6:00 PM at 251 E. Honolulu Street, Lindsay, CA 93247 WHEREAS, the Lindsay Department of Public Safety is a public agency in the County of Tulare, State of California; and
WHEREAS, the Lindsay Department of Public Safety- Fire Services Division routinely responds to requests for assistance outside their jurisdiction; and WHEREAS, the Lindsay Department of Public Safety may be compensated for resources provided or reimbursed for response to requests for assistance to incidents outside their jurisdiction; and WHEREAS, it is the desire of the Lindsay Department of Public Safety to provide fair and legal payment to all its employees for time worked; and
WHEREAS, the Lindsay Department of Public Safety has in its employ; Director of Public Safety, Public Safety Lieutenant, Fire Lieutenant, Fire Apparatus Engineer, Firefighter, Public Safety Officer, and Non-Fire Suppression employees; and
WHEREAS, the Lindsay Department of Public Safety will compensate its employees Portal to Portal while in the course of their employment away from their official duties and assigned to an emergency incident, in support of an emergency incident, or pre-positioned for emergency response; and
WHEREAS, the Lindsay Department of Public Safety will compensate its employees overtime in accordance with a current Memorandum of Understanding while in the course of their employment away from their official duties and assigned to an emergency incident, in support of an emergency incident, or pre-positioned for emergency response.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 256 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-45

Page 2 of 3 ends

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LINDSAY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. Personnel shall be compensated according to a current Memorandum of Understanding, Personnel Rules and Regulations, and/or another directive that identifies personnel compensation in the workplace.

SECTION 2. In the event a personnel classification does not have an assigned compensation rate, a “Base Rate” as set forth in an organizational policy, administrative directive or similar document will compensate such personnel.

SECTION 3. The Lindsay Department of Public Safety- Fire Services Division will maintain a current salary survey or acknowledgement of acceptance of the “Base Rate” on file with the California Governor’s Office of Emergency Services, Fire Rescue Division.

SECTION 4. Fire suppression personnel and non-fire suppression personnel will be compensated (Portal to Portal) beginning at the time of dispatch to the return to jurisdiction when equipment and personnel are in service and available for agency response.

SECTION 5. Fire Department response personnel include Director of Public Safety, Public Safety Lieutenant, Fire Lieutenant, Fire Apparatus Engineer, Firefighter, Public Safety Officers, Financial and Support Staff.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 257 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-45

Page 3 of 3 ends

PASSED AND ADOPTED by the City Council of the City of Lindsay as follows:

MEETING DATE July 26, 2022
MOTION

SECOND MOTION
AYES
ABSENT

ABSTAIN
NAYS

CERTIFICATION OF THE FOREGOING RESOLUTION AS FULL, TRUE, PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF LINDSAY AS DETAILED.

FRANCESCA QUINTANA RAMONA CAUDILLO

CITY CLERK MAYOR
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 258 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Neyba Amezcua, Director of City Services & Planning DEPARTMENT:

ITEM NO.:

City Services & Planning

9.10 MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Consider the Minute Order Approval of the Finalized Contract Change Order #1 (CCO#1) for the Water Treatment Plant Filter Bank A Renovation Project.

BACKGROUND | ANALYSIS
On February 8, 2022, City Council approved the Proposal from ERS Industrial Services to proceed with the Water Treatment Plant Filter Bank A Renovation Project.

The process of renovation included the removal of all existing media and all of the inside filters internal components. This filter was installed back in late 1970’s and has never been renovated/opened for inspection until now. Once all existing filter media was removed and the existing internal metal and polyvinyl chloride piping were exposed, the severe degradation of the internal metal piping was discovered. The Contractor recommended the complete replacement of all piping components with stainless steel material.

On June 28, 2022, Council approved CCO #1 in the amount of $43,000. The Contractor later identified a mistake on their part. The City was notified that the Contractor forgot to include some key components to be redone, which was an error on their end. The price change for the missing components were originally quoted at $42,000. Due to the fact that this was the Contractor’s error, City Staff was able to negotiate the price down to $9,690.

The total revised change order is $43,000 + $9,690 = $52,690

FISCAL IMPACT
Budget: $300,000
Original Contract: $244,860
Contract Change Order: $ 52,690
Total Project: $297,550
Funding Source: America Rescue Plan Act (ARPA) Water Infrastructure Project July 26, 2022 Regular Meeting of the Lindsay City Council

Page 259 ends

STAFF REPORT

Page 2 ends

ATTACHMENTS
• WTP Schematic
• ERS, Industrial Services Quote
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 260 ends

ATTACHMENT A
Water Treatment Plant
729 E Honolulu St

CLARIFIER
BANK A
C B
BANK D

SURGE TANK

CHEMICAL ROOM

CONTROL
ROOM
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 261 ends

Class A, C33 CSLB License #724233 Registered DIR Public Works Contractor #1000003275 2120 WARM SPRINGS COURT FREMONT, CALIFORNIA 94539 | P: 510.770.0202 | E: [email protected] 1 July 11, 2022
Neyba J. Amezcua
City of Lindsay
150 N. Mirage Ave,
P.O. Box 369
Lindsay, Ca 93247
QUOTE #: LIN060519R1PCO#2R1-1QIC
PHONE #: 559-562-7102
EMAIL ADDRESS: [email protected]
Dear Neyba:

ERS is pleased to submit its proposal for our TurnKey Service Surface wash reconditioning, New PVC underdrain laterals for (3) each 10 ft. diameter vertical pressure vessels, Bank A, located in Lindsay, Ca. 93247.

Scope of Supply:

Surface wash rebuild
• Straiten arms and polish. Clean and inspect nozzles and bearings PVC underdrain laterals
• Fabricate new PVC Sch 80 laterals to match existing
Clarifications:
• Filters to be worked on at same time in 1 trip.

Price does not include bonding
Price does not include any valves, instruments or controls ERS will require a media sample for Disposal Testing prior to scheduling the project.

ERS will also repair or replace existing underdrains as needed, on a time and materials basis.

Disposal testing and transport to be executed in compliance with RCRA Subtitles C & D.

Standard Provisions:

1. Qualified manpower:
a. Onsite Supervisor/Environmental Technician/Hole Watch b. Certifications in Forklift/Reach Lift, Crane Operator, Confined Space & Rescue, and First Aid/CPR/AED
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 262 ends

Class A, C33 CSLB License #724233 Registered DIR Public Works Contractor #1000003275 2120 WARM SPRINGS COURT FREMONT, CALIFORNIA 94539 | P: 510.770.0202 | E: [email protected] 2 2. Equipment and PPE:
a. High-power industrial vacuum system
b. Ventilation fan for air circulation
c. Four gas monitors for pre-entry and continuous LEL testing d. Air-purifying respirators (supplied air respirators available if required)

3. Safety Regulations:
a. Confined Space:
i. Tripod/winch for emergency evacuation
ii. Fall arrest harnesses with safety lanyards for all men iii. Permit-required confined space entry permits as applicable iv. Daily monitoring log
b. 2-Way radios for communication with in-tank personnel c. Cellular phone as an emergency response tool

4. New media as follows:
a. None
Additional Coatings Provisions:

1. Quality Control:
a. NACE Coating Inspector Level 2 – Certified to be onsite for duration of coatings phase in order to:
i. Perform and document hold-point inspections in accordance with specifications ii. Provide final inspection and approval of coatings application iii. Produce Daily Inspection Reports confirming coatings operations are in conformance with applicable standards

2. Equipment and PPE:
a. Environmentally controlled trailer with heated plural component spray equipment and specialized equipment technician
b. 24 hour continuous environmental control with dehumidification and monitoring of blasting and coating area
PRICING: $9,690.00

Quote Valid for 30 days
Our time and materials work is billed at $240 per man-hour, straight time, plus materials with a 25% margin. Price includes all applicable sales tax.

Please feel free to call me should you need further information or any clarification. My contact information is: phone - cell (510) 552-3285, office (510) 770-0202; email - [email protected].

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 263 ends

Class A, C33 CSLB License #724233 Registered DIR Public Works Contractor #1000003275 2120 WARM SPRINGS COURT FREMONT, CALIFORNIA 94539 | P: 510.770.0202 | E: [email protected] 3 Sincerely,
Nik Radonich
Sales/Engineering Manager
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 264 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Edward Real, Assistant City Planner
DEPARTMENT:

ITEM NO.:

City Services and Planning

11.1 MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Public Hearing to Consider the Approval of Resolution 22-46, A Resolution of the City Council of the City of Lindsay Approving Conditional Use Permit No. 22-01, A Request by Elevate Lindsay LLC and Courtney Caron to Allow for a Cannabis Dispensary, Cultivation, and Consumption Lounge Within the Central Commercial Zone and Retail Cannabis Dispensary Zone for Property Located at 123 West Honolulu Street, Lindsay, CA 93247.

BACKGROUND | ANALYSIS
Project Description: Conditional Use Permit (“CUP”) 22-01 is a request by Elevate Lindsay LLC (“Elevate”) and Courtney Caron to establish a Cannabis Retail Dispensary, Cultivation, and Consumption Lounge within an existing building at 123 West Honolulu Street in Lindsay, CA 93247. This property is zoned as CC – Central Commercial and is located within the City’s Retail Cannabis Dispensary Zone.

Chapter 18.10.030 of the Lindsay Municipal Code permits Cannabis Dispensaries as well as Cannabis Cultivation within a Dispensary. The business will operate between the hours of 8:00 AM and 10:00 PM on Mondays through Sundays with up to 15 employees per shift.

Building plans identify that the Dispensary and Cultivation portions on the first floor lie behind a guarded point of entry. This includes merchandise that will be exhibited for customers behind locked display cabinets, point of sale terminals, and an 810 square foot cultivation flower room that may be viewed by patrons. The second floor of the project includes a VIP Area, bar serving prepackaged foods and drinks in accordance with California State Law, a lounge area, two restrooms, and a stage. Parking and exterior circulation will be serviced by existing streets and on-street parking stalls along Honolulu Street. The project is not anticipated to generate significant volumes of additional traffic. Odor and noise pollution are not expected to be significant. An HVAC system with carbon air filters will ensure that odors from the venue will not escape into the public. Noise generated from the project use will be consistent with the Zone District and will not deviate from neighboring uses.

City Council is asked to Consider the Approval of Conditional Use Permit 22-01 based on Staff’s findings and subject to the following conditions, which are referenced within Resolution 22-46. • Building and Safety
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 265 ends

STAFF REPORT

Page 2 ends

o Occupancy. Maximum occupancy shall be determined when building plans have been submitted.
o Trash Enclosure. Ensure all required trash receptacles are hidden from public view. o Odor Control. An odor control plan certified by a licensed professional engineer shall be submitted along with the building permit application.
o Operations shall comply with all applicable local and state laws. • Public Safety
o Security cameras with 60 days video retention and storage shall be made available to the Lindsay Department of Public Safety upon request.
• Planning Department
o Site Plan. The use and development of the property shall be in substantial conformance with the illustrative site plan labeled "Lower and upper-level proposed floor plans" submitted on May 15, 2022.
o Parking.
 Provide bicycle parking stalls in accordance with California Green Code

5.106.4.1.
 Install one Level 3 electric vehicle charging station in accordance with California Green Code Title 24, Part 11, in an agreed upon location along Mirage Avenue between Honolulu Street and Samoa Street.
 A food truck shall be allowed to park parallel to the curb directly in front of Elevate taking up no more than 3 striped parking spaces between the hours of 8:00 AM and 10:00 PM excluding Fridays during the Friday Night Market season and when special events are taking place Downtown. Except, with a separately executed contract with Virginia Loya, Market Operator, or the special event coordinator.
• Community Benefit
o Commit at least $10,000 or 1% of gross revenue based on Option #3 (retail, consumption lounge, cultivation) to the proposed Community Benefit's Plan to be implemented based on the recommendations of a Community Panel comprised of residents and local business owners.
o Best effort attempt to hire 100% of employees from Lindsay with hourly wages starting at $16 per hour.
o Provide employees paid opportunities to volunteer with local organizations. o Host donation drives in support of Lindsay Unified School District and other local organizations.
o Meet with the City Council and City Planning Staff to devise a plan to fund repairs and improvements of City parks.
o Provide funding to the Lindsay Department of Public Safety in support of their enforcement against illegal cannabis operations.
o Host a monthly "Community Lecture Series" to bring awareness and education on important topics to local organizations and residents and provide a donation to the cause. o Appoint a Community Engagement Liaison that will be the point of contact for local organizations, businesses, and City Staff.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 266 ends

STAFF REPORT

Page 3 ends

o Membership in at least one local organization, such as the Lindsay Chamber of Commerce, Kiwanis, Rotary Club, etc.
• Pay all fees and taxes imposed by the City of Lindsay. • Meet all City development and State Building Code requirements prior to beginning operations. • Meet all State requirements, laws, and regulations for cannabis businesses in the State of California.
• Meet all City requirements, laws, and regulations found in the City’s Municipal Code. • Failure to comply with any City and State requirements will be considered a violation of the Conditional Use Permit and may result in the revocation of the Conditional Use Permit.

ATTACHMENTS
• Site Plan
• Resolution 22-46
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 267 ends

THESE PLANS SHALL COMPLY WITH THE LOCAL MUNICIPAL CODE AND 2019 EDITION OF THE CALIFORNIA BUILDING CODE WITCH ADOPTS THE 2019 INTERNATIONAL BUILDING CODE, 2019 CMC, 2019 CPC, AND THE 2019 CEC AND CALIFORNIA AMENDMENTS.BUILDING CODES:................................................ 2019 CALIFORNIA BUILDING CODE (C.B.C.) ELECTRICAL CODE:........................................ 2019 CALIFORNIA ELECTRICAL CODE (C.E.C.)MECHANICAL CODE:..................................... 2019 CALIFORNIA MECHANICAL CODE (C.M.C.)PLUMBING CODE:............................................... 2019 CALIFORNIA PLUMBING CODE (C.P.C.)ENERGY CODE (T24 -PART 6):............................... 2019 CALIFORNIA ENERGY STANDARDS ACCESSIBILITY CODE:........................................ 2019 CALIFORNIA BUILDING CODE - CH. 11 GREEN CODE (T24 - PART 11):............................................ 2019 CALIFORNIA GREEN CODE FIRE CODE:.................................................................... 2019 CALIFORNIA FIRE CODE (C.F.C.) SEE GREEN CODE, NON-RESIDENTIAL CHECK LIST ON PAGE GC-1 FOR MANDATORY MEASURES. GENERAL CONTRACTORS AND SUB-CONTRACTORS TO COMPLY WITH APPLICABLE MEASURES.APPLICABLE CODES:

CODES:

SITE PLAN & PROPERTY INFORMATION NS = BUILDING NOT EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM. 506.2.2 MIXED-OCCUPANCY, ONE-STORY BUILDINGS, THE ALLOWABLE AREA OF A MIXED-OCCUPANCY BUILDING WITH NO MORE THAN ONE STORY ABOVE GRADE PLANE SHALL BE DETERMINED IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF SECTION 508.1 BASED ON EQUATION
5-1 FOR EACH APPLICABLE STORY. IN EACH STORY, THE BUILDING AREA SHALL BE SUCH THAT THE SUM OF THE RATIO OF THE ACTUAL

BUILDING AREA OF EACH SEPARATED OCCUPANCY DIVIDED BY THE ALLOWABLE BUILDING AREA OF EACH SEPARATED OCCUPANCY SHALL NOT EXCEED 1.

AREA TABULATIONS BELOW ARE THE AREAS WITHIN THE EXISTING EXTERIOR WALLS PER CHAPTER 2

DEFINITION OF BUILDING AREA
B 19,000 SQ.FT. .13
GOVERNING CODES:
06 / 07 / 2022
KEVIN

RAMIREZ
1:8

OCCUPANT LOAD FACTOR BASED OFF ACTUAL FLOOR AREA

WALLS AND INCIDENTAL AREAS HAVE BEEN OMITTED FROM THIS CALCULATION BUILDING DATA - TABLE 1004.5
BUILDING S.F. RATIO OCCUPANCY
3,614 S.F. 30 NET A-2 = 121
F-1 = 4
B = 17

PROPOSED CONSUMPTION LOUNGE AREA

PROPOSED OFFICE / ADMINISTRATION AREA

PROPOSED STORAGE AREA
PROPOSED DISTRIBUTION / INDOOR NURSERY AREA 953 S.F.
2,504 S.F.
964 S.F.
1/3001/150
TOTALS = 10,119 S.F. MAX.181 OCC.

ALLOWABLE BUILDING AREA

OCCUPANCY

CLASSIFICATION
ACTUAL
SQ. FT.

ALLOWABLE
SQ. FT. RATIO
2,553 SQ.FT.

F-1 910 SQ.FT. 12,000 SQ.FT. .07S-1 882 SQ.FT. 17,500 SQ.FT. .05 M 2,033 SQ.FT. 12,500 SQ.FT. .16
SUM OF ALL RATIOS = .78 ≤ 1

ALLOWABLE AREA FACTOR
CBC TABLE 506.2

OCCUPANCY
CLASSIFICATION B SEE FOOTNOTES NS TYPE III-B 19,000 SQ.FT.

TYPE OF CONSTRUCTION

SEE FOOTNOTES TYPE III-B

OCCUPANCY TYPE OF CONSTRUCTION

CLASSIFICATION
F-1 NS 12,000 SQ.FT.

SEE FOOTNOTES TYPE III-B

OCCUPANCY TYPE OF CONSTRUCTION
CLASSIFICATION M NS 12,500 SQ.FT.

SEE FOOTNOTES TYPE III-B

OCCUPANCY TYPE OF CONSTRUCTION

CLASSIFICATION
S-1 NS 17,500 SQ.FT.

ADDRESS: 139 W HONOLULU ST.

LINDSAY, CA 92347
PROPERTY TYPE: RETAIL SALES
TENANT: GSFH LLC
APN: 205-282-010
ADDRESS: 111 W HONOLULU ST.

LINDSAY, CA 92347
PROPERTY TYPE: RESTAURANT
TENANT: BOLES STEPHEN & JANICE A(CO-TRS)(LLC)
APN: 205-282-008
EXISTING 2-STORY BUILDING

TENANT IMPROVEMENT
ADDRESS: 123 W HONOLULU ST. LINDSAY, CA 92347
CHANGE OF USE: CULTIVATION, DISPENSARY AND CONSUMPTION LOUNGE LOWER LEVEL FLOOR AREA: 5,084 SQ. FT.

UPPER LEVEL FLOOR AREA: 5,035 SQ. FT.

TOTAL BUILDING FLOOR AREA: 10,119 SQ. FT.

ZONING: CC - CENTRAL COMMERCIAL
LAND USE: COMMERCIAL
CONSTRUCTION TYPE: III-B
SPRINKLERED: NO
OCCUPANCIES: A-2 / B / M / S-1
BUILDING HEIGHT: 28'-0"
A.P.N. 205-282-009

TO RECONDITION AN EXISTING BUILDING FOR INDOOR NURSERY, RETAIL, AND CONSUMPTION LOUNGE. INTERIOR NON BEARING WALLS TO BE PROPOSED. TO BRING UP TO CODE THE CURRENT AND PROPOSED ELEMENTS.

FIRE SPRINKLERS: NONE
STORIES:CONSTRUCTION TYPE:

EXISTING - TWO STORY
III-B
TOTAL LAND COVERAGE:

CONCRETE CURBS & WALKWAYS

BUILDING AREA (EXISTING FOOTPRINT)

SITE AREA ANALYSIS
AREA
GROSS LAND AREA 5,200 SQ. FT.

SQ. FT.

SQ. FT. % COVERAGE
5,084 SQ. FT. 97.8%
116 SQ. FT. 2.2%
5,200 SQ. FT. 100%

SITE DATA

RIOS REFUGIO III & JENNIFER LEE
25496 AVENUE 200
STRATHMORE CA 92367
MO+RE DESIGN SOLUTIONS
14176 AMARGOSA RD. STE. C
VICTORVILLE, CA 92392
123 W HONOLULU ST,
LINDSAY, CA 92347
APN: 205-282-009
APPLICANT: PROPERTY OWNER:

PROJECT ADDRESS DESIGNER:

ZONE: CC - CENTRAL COMMERCIAL
OCCUPANCY'S: A-2 / B / F-1 / M / S-1

SCOPE OF WORK

ELEVATE LINDSAY LLC
6907 HAYVENHURST AVE
VAN NUYS, CA 91406
PH: 818-489-8474
1 OF 21

S S S S S S S S S S S

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS S S S S W. HONOLULU
ALLEY
10'-0"
P.L. TO CENTER

OF STREET
22'-0" 130'-0"
P.L. TO CENTER OF STREET
40'-0" ±40.00'

NEAREST FIRE HYDRANT LOCATION
SCALE = 1:5
46 PROPERTY LINE = 130'-0"
N

VICINITY MAP
ELMWOOD AVE.

SWEET BRIER AVE.

HERMOSA ST.

SAMOA ST.

HONOLULU ST.

SITE

LOCATION
PROPOSED MERCANTILE AREA 2,084 S.F.
1/300 S-1 = 4
1/60 M = 35
A-2 3,530 SQ.FT. 9,500 SQ.FT. .37

OCCUPANCY

CLASSIFICATION
A-2

SEE FOOTNOTES
NS

TYPE III-B
9,500 SQ.FT.

TYPE OF CONSTRUCTION
SCALE:PROJECT NO: SHEET:DATE:

No. REVISION DATE

PREPARED BY
PROJECT:

GOVERNING
THESE PLANS SHALL COMPLY WITHTHE 2019 CALIFORNIA BUILDING CODEWHICH ADOPTS THE 2019 CMC, 2019 CPC, 2019 CEC, 2019 CGC, 2019 CRC
AND THE 2019 ENERGY STANDARDSAS WELL AS MUNICIPAL CODE ON

W H I C H T H E P R O J E C T S I T ' S

D E V E L O P E D
DRAFTER:PG. NO.

CONTENT:
|MO+RE| DESIGN SOLUTIONS

THE USE OF THESE DESIGNS , DRAWINGS, SPECIFICATIONS, AND/OR STRUCTURAL CALCULATIONS IS RESTRICTED TO THE ORIGINAL PURPOSE FOR WHICH THEY WERE PREPARED AND FURNISHED TO THE HOLDER. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. OWNERSHIP OF THIS DOCUMENT AND ALL INFORMATION OR DESIGNS CONTAINED HEREIN REMAINS WITH |MO+RE| DESIGN SOLUTIONS ASSOCIATES. REUSE OR OTHER PUBLICATION BY ANY METHOD IS PROHIBITED EXCEPT WITH THE WRITTEN PERMISSION OF |MO+RE| DESIGN SOLUTIONS ASSOCIATES. PROJECT DESIGNER: PROPERTY INFO: SIGNATURE:
14176 AMARGOSA RD. STE C
VICTORVILLE, CA. 92392
WWW.MOREDESIGN.US
EMAIL:[email protected]
PH: (760) 596-7864
PROJECT ADDRESS:
123 HONOLULU ST.

LINDSAY CA, 92347
APN: 205-282-009-000

RIGOBERTO AVALOS REYES
2021-C227
LEGAL DESCRIPTION:

LOT C & WEST 6 LOT B BLK 24
PROPERTY OWNER: RIOS

REFUGIO III & JENNIFER LEE

COMMERCIAL TENANT IMPROVEMENT

FIRE SEPARATION
DISTANCE = X (FEET)

TYPE OF

CONSTRUCTION
X ≥ 5 ALL

OCCUPANCY GROUP
F-1, M, S-1, A, B
2 1
CBC TABLE 602

FIRE-RESISTANCE RATING REQUIREMENTS

FOR EXTERIOR WALLS BASED ON FIRE

SEPARATION DISTANCE
A-2 3,530 SQ. FT. B 2,553 SQ. FT.

F-1 910 SQ. FT
M 2,033 SQ. FT.

S-1 882 SQ. FT.

ALLOWABLE NUMBER OF STORIES
ABOVE GRADE PLANE CBC TABLE 504.4
NS = BUILDINGS NOT EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM

OCCUPANCY

CLASSIFICATION

TYPE OF

CONSTRUCTION

STORIES ABOVE

GRADE PLANE

ALLOWABLE STORIES

ABOVE GRADE PLANE
A-2, B, F-1, M, S-1 NS TYPE III-B 1
2 3

ALLOWABLE BUILDING HEIGHT
IN FEET ABOVE GRADE PLANE CBC TABLE 504.3
NS = BUILDINGS NOT EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM

OCCUPANCY

CLASSIFICATION

TYPE OF

CONSTRUCTION

FINISHED BUILDING

HEIGHT ABOVE GRADE

ALLOWABLE
HEIGHT
B, F, S, A NS TYPE III-B 28' 55

SHEET INDEX
SHEET # GENERAL DESCRIPTION
A-0 EXISTING SITE PLAN & GENERAL PROJECT INFORMATION
A-0.5 DEMOLITION FLOOR PLAN
A-1 PROPOSED LOWER FLOOR PLAN & DOOR
A-3 EXISTING EXTERIOR ELEVATIONS & ROOF PLANA-4 PROPOSED REFLECTIVE CEILING PLANA-5 PROPOSED PLUMBING CALCULATIONS PLANA-6 PROPOSED EGRESS FLOOR PLANA-7 PROPOSED DOOR MANEUVERING PLAN A-8 THRU A-15 ACCESSIBILITY GENERAL NOTES & ENLARGED RESTROOMS A-16 BUILDING GENERAL NOTES SHEET
A-17 THRU A-19 CGBCS GENERAL NOTES SHEETS
A-2 PROPOSED UPPER LEVEL FLOOR PLAN & STAIRS ELARGED
PROPOSED WATER METER.PROPOSED PROPERTY SEWER LATERAL.PROPOSED CONCRETE CURB PER CITY/COUNTY STANDARDS. 4" NOMINAL THICK CONCRETE WALKWAYS. SEE CIVIL PLANS FOR WIDTH AND DIMENSIONS.

PROPOSED LOCATION OF GAS METER.EXISTING OFF-SITE HYDRANT.

KEYED NOTES

PLATFORM FOR DROP-DOWN FIRE ESCAPE LADDERPROPOSED ACCESS LADDER 34567891
2 1
2 PROPOSED CONCRETE GUTTER PER CITY/COUNTY STANDARDS.
3 5
7 8
9 A-0
CL CL
CL CL

EXISTING SITE PLAN
PL
PL
PL
PL

HATCHED AREA INDICATES

OVERHANG OF UPPER LEVEL
SD-1 WALL & CEILING DETAILS SHEET
PROPERTY LINE = 130'-0"
PROPERTY LINE = 40'-0" N
5 20
10 50
SCALE = 1: 5
0 6/7/2022 8:59:58 PM, ARCH E1 (30.00 x 42.00 Inches), Henny July 26, 2022 Regular Meeting of the Lindsay City Council Page 268

PROPOSED LOWER LEVEL FLOOR PLAN
SCALE: 3/16" = 1'-0"
GYP. BOARD (2) LAYERS OF ENAMEL PAINT, COLOR: _______ CODE: ______ BY: SHERWIN WILLIAMS OR EQUAL TEXTURE: SMOOTH & WASHABLE SURFACETEXTURE: SMOOTH & WASHABLE SURFACE 1/16" GROUT JOINT RECOMMENDATION
INSULATED METAL PANEL F.R.P. PANEL CERAMIC TILE CERAMIC COVING BASE PRE-MANUFACTURED 26 GA. METAL PANEL OR EQUIVALENT ,(OWNER TO SELECT MODEL & MANUFACTURER)MOISTURE RESISTANT FRP WALL PANEL, COLOR: WHITE 3"X6" CERAMIC TILE BY: EMSER TILE, SERIES: CHOICE, COLOR:

WHITE
3/8" MIN. COVING FLOORING BASE BOARD, COLOR: TO MATCH

WALL FINISH

BASE FINISH REMARKS

CONCRETE EPOXY

VINYL PLANK FLOORING
GYP. BOARD
1) ALL MATERIAL USED AS INTERIOR TRIM SHALL HAVE A MINIMUM CLASS C FLAME SPREAD AND SMOKE-DEVELOPED INDEX SHALL NOT EXCEED 10% OF THE WALL OR CEILING AREA IN WHICH IT IS ATTACHED.
2) CURTAINS, DRAPERIES,FABRIC HANGINGS, AND SIMILAR COMBUSTIBLE DECORATIVE MATERIALS SUSPENDED FROM WALLS OR CEILINGS SHALL NOT EXCEED 10% OF THE WALL OR CEILING AREA TO WHICH SUCH MATERIALS AREA ATTACHED. (2) LAYERS OF ENAMEL PAINT, COLOR: _______ CODE: ______BY: SHERWIN WILLIAMS OR EQUAL(1) LAYER OF DB CLASSIC 9510 RESISTANT URETHANE OVER (1)LAYER OF DB CLASSIC 3300 EPOXY 8"x48" PLANK FLOORING OWNER TO SPECIFY MANUFACTURER
AND COLOR.

TEXTURE:________
1-HR FIRE RATED ASSEMBLY @ CORRIDORS
EPOXY FLOORING FINISH UNDERLAYER OF PRIMER, COLOR: OWNER TO SPECIFY MANUFACTURER COAT: CLEAR SEMI-GLOSS EPOXY FINISH COVE AT LEAST 4" UP INSULATED PANEL INSULATED METAL PANEL PRE-INSTALLED 26 GA. METAL PANEL (OR EQUIVALENT), HARDWARE:
• (3) 4A. BALL BEARING HINGES
BB1279, 4-1/2" x 4-1/2"BY: HAGER OR EQUAL
• (1) PUSH / PULL PLATES
BY: SCHLAGE OR EQUAL
• (1) CLOSER - LCN 1460
WHEN REQUIRED.

BY: LCN OR EQUAL
• FLOOR STOP -FS17
BY: IVES OR EQUAL
• (1) SILENCER -SR64
BY: IVES OR EQUAL
• 10" HI. KICK PLATE NO.
8400-S32D (PUSH SIDE)
BY: IVES OR EQUAL
LAY-IN 'T' BAR 2'X4' LAY-IN ACOUSTIC PANEL, COLOR: WHITE. MOLD, RUST, WATER AND BACTERIA RESISTANT TEXTURE: SMOOTH;
3'-6" x 7'-0" H.C.M.3'-0" x 7'-0"
5'-10" x 7'-0" 1-3/4"
6'-0" x 5'-6" ALUMINUM FRAME
1 FIXED EXISTING WINDOW TO REMAIN
3'-0" x 7'-0" H.C.M.

EXISTING 36" DOOR SELF CLOSING TO REMAIN
SET OF DOUBLE 34" DOORS - TEMPERED GLASS - SELF CLOSING - NOT LATCHING DEVICE PRESENT - NO SPECIAL KNOWLEDGE TO OPERATE36" DOOR - SELF CLOSING - NO SPECIAL KNOWLEDGE REQ. TO OPERATE - 20-MIN. FIRE RATED AT CORRIDORS CERAMIC TILE 24" SQ. CERAMIC TILE OWNER TO SPECIFY MANUFACTURER AND COLOR. 3/16" GROUT JOINT RECOMMENDATION PROPOSED 42" DOOR SELF CLOSING - NO SPECIAL KNOWLEDGE REQ. TO OPERATE - 20-MIN. FIRE RATED AT CORRIDORS HARDWARE:
• (3) 4A. BALL BEARING HINGES
BB1279, 4-1/2" x 4-1/2"BY: HAGER OR EQUAL
• (3) SILENCERS - SR64
BY: IVES OR EQUAL
• (1) CLOSER - ITS96 SERIES
WHEN REQUIRED.

BY: DORMA OR EQUAL
• FLOOR STOP -FS17
BY: IVES OR EQUAL

AUTHORIZED PERSONNEL

ONLY SIGN
DOOR
LINE OF F.F.

HARDWARE:
• (3) 4A. BALL BEARING HINGES
BB1279, 4-1/2" x 4-1/2"BY: HAGER OR EQUAL
• (3) SILENCERS - SR64
BY: IVES OR EQUAL
• (1) CLOSER - ITS96 SERIES
WHEN REQUIRED.

BY: DORMA OR EQUAL
• FLOOR STOP -FS17
BY: IVES OR EQUAL

DOOR DOOR
3'-0" x 7'-0" H.C.M.
36" DOOR - SELF CLOSING - NO SPECIAL KNOWLEDGE REQ. TO OPERATE - 20-MIN. FIRE RATED AT CORRIDORS 3'-0" x 7'-0" H.C.M. 36" DOOR - SELF CLOSING - 20-MIN. FIRE RATED - ALL HARDWARE TO BE NICKEL PLATED W/ SATIN FINISH U.N.O.- ALL RESTROOMS TO HAVE PRIVACY LATCHES & LOCKS.- ALL REQUIRED EXIT DOORS SHALL NOT REQUIRE ANY SPECIAL KEY, TOOL, KNOWLEDGE, OR EFFORT TO OPEN, INCLUDING DEADBOLT KEY.

PER MFGR. STDS. ; MAY BE TROWLED,ROLLED, OR BRUSHED ON. TROWELED EPOXY COVE BASE CONTINUOUS SMOOTH EPOXY FLOORING 4" UP TO THE WALL

EXPOSED FRAMING EXISTING EXPOSED ROOF FRAMING TO REMAIN 3'-0" x 7'-0" 1 H.C.M. 36" DOOR - SELF CLOSING - NO SPECIAL KNOWLEDGE REQ. TO OPERATE W/ PANIC HARDWARE 3'-0" x 2'-10" 1-3/4" H.C.M. 36" WD. x 34" H. COUNTER DOOR

SEE ADA SIGNAGE

INFORMATION

HINGE SIDE OF DOOR

HINGE SIDE OF DOOR

HINGE SIDE OF DOOR
LINE OF F.F. LINE OF F.F.

W1W2W3W4W5W6W7
F1F2F3F4
C1C2C3C4
E2
D6
S1
D1D2D3D4D5

FINISH SCHEDULE

DOOR SCHEDULE

WINDOW SCHEDULE

DOOR ELEVATIONS

FLOORING FINISH SCHEDULE

BASE FINISH REMARKS
# BASE FINISH REMARKS

WALL FINISH SCHEDULE

CEILING FINISH SCHEDULE
##
FINISH NOTES:

E1

EXISTING WINDOWS
# SIZE QTY. TYPE MATL. REMARKS
1-3/4"1-3/4"1-3/4"1-3/4"
12 33
1111
S.C.F.

S.F.
1-3/4"1-3/4"

PROPOSED DOORS

EXISTING DOORS
# SIZE THK. QTY. TYPE. REMARKS

COVE BASE
SLIMFOOT 3/8" MIN. RADIUS, 6" MIN. HI. COVING FLOORING BASE BOARD FOR SEALED CONCRETE OR SEAMLESS CONTINUOUSEPOXY UP WALL MIN. OF 6" WITH A MIN. 3/8" COVE AND MIN.

THICKNESS OF 3/16" W/ METAL CAP

PRODUCT AND INSTALLATION SHALLMEET ALL MATERIAL REQUIREMENTS

PLUMBING WALL
SCALE:PROJECT NO: SHEET:DATE:

No. REVISION DATE

PREPARED BY
PROJECT:

GOVERNING
THESE PLANS SHALL COMPLY WITHTHE 2019 CALIFORNIA BUILDING CODEWHICH ADOPTS THE 2019 CMC, 2019 CPC, 2019 CEC, 2019 CGC, 2019 CRC
AND THE 2019 ENERGY STANDARDSAS WELL AS MUNICIPAL CODE ON

W H I C H T H E P R O J E C T S I T ' S

D E V E L O P E D
DRAFTER:PG. NO.

CONTENT:
|MO+RE|

DESIGN SOLUTIONS

THE USE OF THESE DESIGNS , DRAWINGS, SPECIFICATIONS, AND/OR STRUCTURAL CALCULATIONS IS RESTRICTED TO THE ORIGINAL PURPOSE FOR WHICH THEY WERE PREPARED AND FURNISHED TO THE HOLDER. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. OWNERSHIP OF THIS DOCUMENT AND ALL INFORMATION OR DESIGNS CONTAINED HEREIN REMAINS WITH |MO+RE| DESIGN SOLUTIONS ASSOCIATES. REUSE OR OTHER PUBLICATION BY ANY METHOD IS PROHIBITED EXCEPT WITH THE WRITTEN PERMISSION OF |MO+RE| DESIGN SOLUTIONS ASSOCIATES. PROJECT DESIGNER: PROPERTY INFO: SIGNATURE:
14176 AMARGOSA RD. STE C
VICTORVILLE, CA. 92392
WWW.MOREDESIGN.US
EMAIL:[email protected]
PH: (760) 596-7864
PROJECT ADDRESS:
123 HONOLULU ST.

LINDSAY CA, 92347
APN: 205-282-009-000

RIGOBERTO AVALOS REYES
2021-C227
LEGAL DESCRIPTION:

LOT C & WEST 6 LOT B BLK 24
PROPERTY OWNER: RIOS

REFUGIO III & JENNIFER LEE

COMMERCIAL TENANT IMPROVEMENT
N
13'-1" 63'-6" 30'-5" 18'-0"
16'-11"
4'-0" 5'-10" 7'-1"
15'-1"
6'-5" 8'-8"
21'-3" 12'-9" 14'-7" 30'-11" 7'-10" 4'-4" 5'-4"
12'-0" 7'-3"
7'-6" 6'-10" 4'-11"
5'-4" 8'-0" 7'-8"
2'-8" 5'-0"
18'-0"
7'-10" 12'-6" 12'-2" 7'-0" 6'-8" x 7'-4" 28'-0" CLG. ELEVATOR 5'-11" x 6'-4" 10' CLG. MECH. RM. 14'-6" x 13'-10" 10' CLG.

PRODUCT
STOCK
20'-9" x 11'-6"
10' CLG.

ORDER

PROCESSING
20'-9" x 6'-9"
10' CLG.

CASHIERS
13'-10" x 7'-0"
10' CLG.

OFFICE 1
76'-7" x 24'-8"
14' CLG.

RETAIL AREA
P.O.S. P.O.S. P.O.S. P.O.S. P.O.S.

DISPLAY
13'-2" x 12'-2"
14' CLG.

LOBBY
30'-1" x 26'-6"
12' CLG.

CULTIVATION

FLOWER ROOM
11'-10" x 7'-2"
10' CLG.

REF. KITCHENETTE & LOCKERS
SINK D.W.

LOCKERS
W.C. LAV.
7'-6" x 7'-6"
10' CLG.

RESTROOM
4'-0" x 7'-6"
10' CLG.

JANITOR
17'-2" x 10'-4"
12' CLG.

FERTIGATION ROOM

EXISTING STAIRS
10' CLG.

CORRIDOR
SCALE: 3/16" = 1'-0"
A-106 / 07 / 2022 KEVIN RAMIREZ 3 OF 21
3/16" = 1'-0"

PROPOSED LOWER LEVEL FLOOR PLAN
11'-10" x 6'-8"
12' CLG.

DRY / TRIMMING
7'-0"
5'-4"

CLEAR WIDTH
5'-1"
CLR.

ATM
1 12

DISPLAY DISPLAY DISPLAY
10 - MOUNTING HEIGHT FOR TACTILE SIGNAGE:SIGNS CAN NOW BE MOUNTED WITHIN A RANGE OF SPACE WHICH ALLOWS FOR A CONSISTENT TOP HEIGHT FOR DIFFERENT SIZED SIGNSALONG A HALL. - SIGNS ARE TO BE MOUNTED AT A HEIGHT TO ALLOW THE BASELINES OF RAISED CHARACTERS TO BE LOCATED BETWEEN 48" AND 60" ABOVE THEGROUND.MOUNTING LOCATION MUST ALLOW APERSON TO APPROACH WITHOUTENCOUNTERING PROTRUDING

OBJECTS OR STANDING WITHIN THESWING PATH OF THE DOOR

FINISH FLOOR
MINIMUM HEIGHT: BASELINE

OF LOWEST COPY MOUNTED
NO LOWER THAN 48" ABV. F.F.MAXIMUM HEIGHT: BASELINE

OF HIGHEST COPY MOUNTED
NO HIGHER THAN 60" ABV. F.F.

ALLOWED

MOUNTING
AREA
TACTILE EXITING SIGN WITH LEGEND "EXIT"TACTILE SIGN WITH LEGEND "EXIT ROUTE" WALL MOUNTED TACTILE SIGN STATING "STAIRS"

CONTRASTING SIGN WITH LEGEND 'NO SMOKING'
EXIT
5/8" TO 2" HIGH RAISED 1/32" SANSSERF NON-GLARE HI. CONTRAST EXIT
ROUTE
UPPERCASE CHARACTERSLETTERING RAISED 1/32"
DOOR MOUNTED TACTILE SIGN STATING "TYPE OF RESTROOM"

INTERNATIONAL SYMBOL OF ACCESSIBILITY
48" MINIMUM
60" MAXIMUM
S1S2S3S4S5S6

ADA SIGNAGE INFORMATION
S1S2S3
S5

HINGE SIDE OF DOOR
3/8" TO 1/2"
NO

SMOKING
STAIRS S4 S6
27'-4" 5'-0"

CLEAR WIDTH
5'-4"

CLEAR WIDTH

AMPERES
J.

FINISH SURFACE

SYMBOL DESCRIPTION
REF.

ØAMP.ABV.A.F.F. ABOVE FINISH FLOOR
ABOVE
BLDG.(E) / EX.

BUILDING
DIA.CLG. CEILINGCT. CIRCUIT

EXISTING
WIDTH
EQUIP. EQUIPMENT
G.F.I. GROUND FAULT INTERRUPTERG.F.P. GROUND FAULT PROTECTION

ELECTRICAL JUNCTION BOX
NO. / # NUMBER
ELEC. ELECTRICAL
TYP. TYPICALV. VENTVTR. VENT THRU ROOFW.C. WATER CLOSETMAX. MAXIMUM C1D1 CLASS 1, DIVISION 1 MIN. MINIMUMC1D2 CLASS 1, DIVISION 2 RM. ROOMW.H. WATER HEATERLAV. LAVATORY

REFRIGERATOR
FRZ. FREEZER
W.P. WATERPROOF
F.S.

F.F. FINISH FLOORELEV. ELEVATIONBOT.BM.

BOTTOMBEAM
MTL. METAL
EA. EACH@ AT
THK. THICK / THICKNESSGYP. GYPSUM
BRD. BOARD
HR. HOUR / HOURSYR. YEAR / YEARSPREP. PREPARING
COMP. COMPARTMENT O.H. OVER-HEADCAB. CABINET / CABINETSDN. DOWNDECO. DECONTAMINATION MICRO. MICROWAVE
D.W. DISH WASHER MACHINECLR. CLEAR% PERCENTAGE / PERCENT

DIAMETERDIAMETER
DP.

WD.LG. LENGTH

DEEP / DEPTH
SPEC. SPECIFICATION(S)U.N.O. UNLESS NOTED OTHERWISE
G.C. GENERAL CONTRACTOR
HI. HIGHHT. HEIGHTSYS. SYSTEM
GRD. GRADE
ST. STAIRS(N) NEWMATL. MATERIAL

SYMBOLS & ABBREVIATIONS
##XX##
XX
X X

X DENOTES EQUIPMENT SPECIFICATION

SEE EQUIPMENT SCHEDULE

DENOTES KEYED NOTE NUMBER

SEE KEYED NOTES LEGEND

DENOTES DOOR NUMBER

SEE DOOR SCHEDULE

DETAIL NUMBER DESIGNATION

VIEW DIRECTION OF INTERIOR ELEVATION

SHEET NUMBER

NUMBER OF INTERIOR ELEVATION

VIEW DIRECTION OF DETAIL / SECTION

DETAIL NUMBER / SECTION NUMBER

SHEET NUMBER

INDICATES SIGNAGE TYPE AND LOCATION

SEE ADA SIGNATE INFORMATION

INDICATES FINISH MATERIALS PERFINISH SCHEDULE ON THIS SHEETPAGE NUMBER DESIGNATION

METAL DOOR FRAME
WALL FINISH.

HOLLOW MTL. DR.

STUD ANCHOR

EXTERIOR FINISHINTERIOR FINISH

SEE PLAN FOR

EXACT LOCATION
'J' MOLDING FOR ALL

EXTERIOR FINISHES
DOOR PER SCHED.

EXTERIOR DOOR THRESHOLD

EXPANSION JOINT

FINISH FLOOR

ALUMINUM THRESHOLD

TO EXTEND BEYOND
EXPANSION JOINTDOOR PER SCHED.

CARPET OR INTERIOR FLOORING TO CONCRETE
CERAMIC TILE. SEE

FINISH SCHEDULE

CONCRETE EPOXYSEALANT PRODUCT
DOOR PER SCHD.

SEALANT
EX. DRAINAGEPLANE
- FLOOR AND GROUND SURFACES SHALL BE STABLE. FIRM, AND SLIP RESISTANT. 11B-302.1
- CARPET OR CARPET TILE SHALL BE SECURELY ATTACHED AND SHALL HAVE A FIRM CUSHION, PAD, OR BACKING OR NO CUSHION OR PAD.

CARPET OR CARPET TILE SHALL HAVE A LEVEL LOOP, TEXTURED LOOP, LEVEL CUT PILE, OR LEVEL CUT/UNCUT PILE TEXTURE. PILE HEIGHT SHALLBE 1/2" MAXIMUM. 11B-302.2, FIGURE 11B-302.2 - VERTICAL CHANGES IN LEVEL FOR FLOOR OR GROUND SURFACES MAY BE 1/4 INCH HIGH MAXIMUM AND WITHOUT EDGE TREATMENT. CHANGES IN LEVEL GREATER THAN 1/4 INCH AND NOT EXCEEDING 1/2 INCH IN HEIGHT SHALL BE BEVELED WITH A SLOPE NOT STEEPER THAN 1:2. 11B-303, FIGURES 11B-303.2 & 11B-303.3
- CHANGES IN LEVEL GREATER THAN 1/2 INCH IN HEIGHT SHALL BE RAMPED AND SHALL COMPLY WITH THE REQUIREMENTS OF 11B-405 RAMPS OR 11B-406 CURB RAMPS AS APPLICABLE. 11B-303
- ABRUPT CHANGES IN LEVEL EXCEEDING 4 INCHES IN A VERTICAL

DIMENSION BETWEEN WALKS, SIDEWALKS OR OTHER PEDESTRIAN WAYS AND ADJACENT SURFACES OR FEATURES SHALL BE IDENTIFIED BYWARNING CURBS AT LEAST 6 INCHES IN HEIGHT ABOVE THE WALK OR SIDEWALK SURFACE OR BY GUARDS OR HANDRAILS WITH A GUIDE RAILCENTERED 2 INCHES MINIMUM AND 4 INCHES MAXIMUM ABOVE THESURFACE OF THE WALK OR SIDEWALK. THESE REQUIREMENTS DO NOT

APPLY BETWEEN A WALK OR SIDEWALK AND ADJACENT STREET OR DRIVEWAY. 11B-303.5
1/2" MAX.
1/4" MAX.

TRANSITION DETAILS
SHOWER HEAD FIXTURE ...........................................................................

KITCHEN FAUCET .......................................................................................LAVATORY ...................................................................................................

WATER CLOSET ..........................................................................................

UTILITY FAUCET .........................................................................................

2.0 GPM @ 80 PSI1.8 GPM @ 60 PSI

0.5 GPM @ 60 PSI

1.28 GAL. / FLUSH1.5 GPM @ 60 PSI

FIXTURE NAME FLOW RATE
WATER EFFICIENCY SECTION 5.303 OF CALIFORNIA GREEN CODE

NEW PLUMBING FIXTURES AND FITTINGS SHALL NOT EXCEED THE MAXIMUM ALLOWABLE FLOW RATES SPECIFIED IN SECTION 5.303.3. SEE SHEETS A-17 FOR GREEN SHEETS.

1. SEE GREEN CODE NON-RESIDENTIAL CHECK-LIST ON SHEET A-17 FOR MANDATORY MEASURES. G.C. & SUB-CONTRACTOR TO COMPLY WITH APPLICABLE MEASURES AND REGULATIONS.

2. PLAN FOR TESTING AND ADJUSTING SYSTEMS PER SECTION 5.410.4:

A) HVAC SYSTEM TO BE INSTALLED, TESTED, ADJUSTED AND BALANCED BY LICENSED HVAC CONTRACTOR AND TO COMPLY WITH MINIMUM REQUIREMENTS PER ENERGYFORMS AND NOTES ON SHEET A-17. B) INDOOR AND OUTDOOR LIGHTING CONTROLS TO BE TESTED, ADJUSTED ANDBALANCED BY THE LICENSED ELECTRICAL CONTRACTOR AND TO COMPLY WITH APPLICABLE PAGES OF THE ENERGY FORMS ON SHEET A-17. C) WATER HEATING SYSTEM TO BE INSTALLED, TESTED, ADJUSTED AND BALANCED BYA LICENSED PLUMBING CONTRACTOR AND TO COMPLY WITH PLUMBING PAGES OF THE CONSTRUCTION DOCUMENTS AND PART 2 OF 2 ON THE MECHANICAL 2C FORM ON SHEET A-17. D) LANDSCAPE IRRIGATION SYSTEM TO BE INSTALLED, TESTED AND ADJUSTED BY A LICENSED LANDSCAPE CONTRACTOR AND TO COMPLY WITH THE APPROVEDLANDSCAPE IRRIGATION PLANS & COMPLY WITH WATER BUDGET PER EM WDREQUIREMENTS.

WATER EFICIENCY SCHD.

GREEN BUILDING CODE NOTES
A) FIRE ALARM PANEL(S) TO BE LOCATED IN THE OFFICE AREA.

B) MANUAL FIRE ALARM BOXES SHALL BE LOCATED NOT MORE THAN 5 FEET FROM THE ENTRANCE TO EACH EXIT. (C.B.C. SECTION 907.4.2).

C) MANUAL FIRE ALARM BOXES SHALL BE A MINIMUM OF 42" AND MAXIMUM OF 48" ABOVE FINISH FLOOR. (C.B.C. SECTION 907.4.2).

D) MANUAL FIRE ALARM BOXES CONTROL AND OPERATING MECHANISMS SHALL BE

OPERABLE WITH ONE HAND WITHOUT TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST. THE MAXIMUM EFFORT TO ACTIVATE CONTROLS SHALL BE NO GREATERTHAN 5 POUNDS-OF-FORCE.

E) PROVIDE VISIBLE ALARM IN PUBLIC RESTROOMS AND EMPLOYEE RESTROOMS, CONFERENCE ROOMS AND LOBBIES PER C.B.C. SECTION 907.5.2.3.1. - ALL DOORS SHALL HAVE LEVER HARDWARE (HANDLE). THE LEVER HARDWARE SHALL BE CURVED WITH A RETURN TO WITHIN 1/2" OF THE DOOR TO PREVENT CATCHING ON THE CLOTHING OF PERSONS EGRESS PER SECTION 11B-404.2.8 AND PART 2, PER SECTION 12-10-202F REQUIREMENTS FORLEVER HARDWARE AS ADOPTED BY THE STATE FIRE MARSHAL. - DOOR CLOSER SHALL BE ADJUSTED SO THAT FROM AN OPEN POSITION OF 90 DEGREES, THE TIME REQUIRED TO MOVE THE DOOR TO A POSITION OF 12 DEGREES FROM THE LATCH IN 5 SECONDS MINIMUM PER SECTION 11B-404.2.8. - DOOR OPENING FORCE OF 5 POUNDS MAXIMUM FOR INTERIOR AND EXTERIOR DOORS. A DOOR OPENING FORCE OF 15 POUNDS MAXIMUM FOR ALL FIRE RATED DOORS SHALL BE PROVIDED PER SECTION 11B-404.2.9 OF CALIFORNIA BUILDING CODE 2019. - ALL DOORS SHALL COMPLY WITH C.B.C. 2019 SECTION 1008.1.9 THRU SECTION 1008.1.10.2.- ALL DOOR GLAZING SHALL BE TEMPERED GLASS.- DOORS USED AS MEANS OF EGRESS SHALL BE EQUIPPED WITH FULL PANIC HARDWARE PER C.BC. 2019 SECTION 1008.1.10 - SEE EGRESS PLAN.

EXITS SIGNS SHALL BE ILLUMINATED AT ALL TIMES. INSURE CONTINUED ILLUMINATIONFOR A DURATION OF NOT LESS THAN 90-MIN. IN CASE OF PRIMARY POWER LOSS, THE

SIGN SHALL BE CONNECTED TO A STORAGE (BACK-UP) BATTERY, UNIT EQUIPMENT OR AN ON-SITE BACK-UP POWER GENERATOR.

DOOR HARDWARE NOTES

FIRE ALARM NOTES

ILLUMINATED EXITING SIGNS
D1 D2 D3

SYMBOL DESCRIPTION
2X STUDS WALL @ 16" O.C. (TYP. AS SHOWN)
EXISTING 8" THK. CMU WALL PER CBC TABLE 722.3.2
4+ HOUR RATING
6" WD. INSULATED PANEL WALLS w/ 26 GA. POWDER COATED SHEET

METAL ON EACH SIDE
INDICATING AREA OF 1HR. FIRE RATED WALL PER UL DES U419

WALL LEGEND
INDICATING INSULATED PANEL w/ 1HR. FIRE RATED WALL
43 5
67 8
11 12
4'-10" x 5'-6" ALUMINUM FRAME E2 1 FIXED EXISTING WINDOW TO REMAIN 2'-11" x 5'-6" ALUMINUM FRAME E3 1 FIXED
3'-0" x 4'-0" ALUMINUM FRAME E4 3 FIXED5'-0" x 4'-0" ALUMINUM FRAME E5 1 FIXED7'-6" x 4'-0" ALUMINUM FRAME E6 2 FIXED E1
E4E4E4
D6
E2
E3

EXISTING WINDOW TO REMAINEXISTING WINDOWS TO REMAINEXISTING WINDOW TO REMAINEXISTING WINDOWS TO REMAIN E2
S1
S2
D4
D3
D4
D4
D2
D2
D2
D2
D2
D2
D2
2 W8 EXISTING C.M.U. WALL EXISTING 6" THK. CMU 4+ HOUR FIRE RATED W1 W6 W8 F3
W1 W7 W8 F2
W1 W7 F2 C1
F1 C4
W1 W6
W2 W6 F3 C2
W2 W6 F3 C2
W2 W6 F3 C2
15 W1 W6 F3 C1
W5
F4
W3 W4
W5
F4 C1
W3

DASHED LINES TOINDICATE ENLARGEDRESTROOMS (SEE SHEET
A-8 FOR REFERENCE
17 C1
C3
C4
W1 W7 W8 F2 C1
W1 W6 F3 C1
(E) STAIR DATA =RISE = 5.625"RUN = 11"
STEP TOTAL = 32
ROLLING CULTIVATION TABLE. (PROVIDE MIN. 44" AISLE)

LOCATION OF FIRE EXTINGUISHER

OCCUPANT LOAD SIGN TO BE POSTED IN A CONSPICUOUS PLACE
NEAR ALL MAIN ENTRANCES (CBC 1008.1.9.)PROVIDE ABOVE DOOR SIGN LEGEND STATING - "DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED"
COUNTER SURFACE TO BE MAXIMUM 34" ABOVE FINISH FLOOR ANDMINIMUM TO BE 28" ABOVE FINISH FLOORINSTALL MINIMUM 2" AND MAXIMUM 4" CONTRASTING STRIPE ATFIRST AND LAST STEP OF STAIR RUN @ INTERIOR STAIRWAY CONTRASTING STRIPE TO BE INSTALLED 1" OFF EDGE

HANDRAIL HEIGHT, MEASURED ABOVE STAIR TREAD NOSINGS OFFINISH SURFACE, SHALL BE UNIFORM AND UNINTERRUPTED NOT LESS THAN 34" AND NOT MORE THAN 38". 2019 CBC SECTION 1014

EXISTING STRUCTURAL COLUMNS TO REMAIN (PROTECT IN PLACE

DURING CONSTRUCTION)
EXISTING DOOR TO BE REMOVED AND TO BE FILLED w/ 2x STUDS @16" O.C. (MATCH EXTERIOR FINISH)PROPOSED LOCATION OF ELEVATOR MECHANICAL EQUIPMENT

KEYED NOTES
1234567
8 1011
PROPOSED LOCATION GLASS DISPLAY CASE / CABINETSLOCATIONS (DESIGN BY OTHERS) 1230" MIN. x 48" MIN. SIDE APPROACH / PARALLEL CLEAR SPACE PERCBC 11B 14 PROPOSED LOCKERS LOCATION w/ ACCESSIBILITY. PLEASE REFER TO SHEET A-8 LOCKER DETAIL 15
16 PROPOSED ROOF ACCESS LADDER
S6
S1
S1
4 3
ER
EXIT
EXIT
ER
ER
W1 W6 W8 F3 C1
12'-2"
1'-4"
DOOR

OPENING
2"

FRAME WIDTH

FIELD VERIFY
30" x 48"

THE TRIANGLE SHALL CONTRAST
WITH THE CIRCLE SYMBOL. EITHER

LIGHT ON DARK BACKGROUND OR
DARK ON A LIGHT BACKGROUND.
9 EXISTING WINDOW OPENINGS TO BE FILLED w/ 2x STUDS @16" O.C. 6'-0" x 3'-0" PASS-THRU
WINDOW
ERW2 W6 W8 F3 C4
S2 S2
7'-9" 5'-0"
14'-4" 24'-8"
5'-4"
9'-11"
9'-10"
13 LOCATION OF ORDER STATION
5 10
13 14
S3
8 5
14 17 PROPOSED RECEPTION DESK LOCATION
ATM
HARDWARE:
• (3) 4A. BALL BEARING HINGES
BB1279, 4-1/2" x 4-1/2"BY: HAGER OR EQUAL
• (3) SILENCERS - SR64
BY: IVES OR EQUAL
• (1) CLOSER - ITS96 SERIES
WHEN REQUIRED.

BY: DORMA OR EQUAL
• FLOOR STOP -FS17
BY: IVES OR EQUAL

HINGE SIDE OF DOOR
STOREFRONT SYSTEM S1
10"
LINE OF F.F.
16 GA. MIN. CLOSER

REINFORCEMENT

POLYSTYRENE

INSULATED CORE
10 GA. MIN., 4'1/2" HIGH
FREQUENCY HINGEREINFORCEMENT.
(TYP. OF 3)

FIRE-RESISTANT MORTISELOCK SYSTEM
16 GA. MIN. FRAME
18 GA. MIN. COLD ROLLED (NFPA 80 RATED)

OR GALVANIZED STEEL
FACE SHEET.
20 MIN. FIRE RATED DOOR D4
S1
2 SD-1
SD-1
1 SD-1
7 S2 S3
13 SEE ELEVATORSPECIFICATIONS &
DETAILS ON SHEET A-10

INDICATES LEVEL CHANGE
3'-4"
TYP.
3'-4" 3'-4"
10'-0"
2'-0" 6'-0" 2'-0"
13'-5"
6'-2"
36" DBL. DOOR
2'-10"

T T T T
T T
3'-4"
TYP.
10'-0"
8'-0"
HARDWARE:
• (3) 4A. BALL BEARING HINGES
BB1279, 4-1/2" x 4-1/2"BY: HAGER OR EQUAL
• (1) LOCKSET AL80PD F84 NEP-619
BY: SCHLAGE OR EQUAL
• (1) SILENCER -SR64
BY: IVES OR EQUAL
• CLOSER - ITS96 SERIES
BY: DORMA OR EQUAL
• (1) FLOOR STOP -FS17
BY: IVES OR EQUAL

STOREFRONT SYSTEM
LINE OF F.F.

S4
1'-4"
STOREFRONT SYSTEM S2
10"
MIN.

LINE OF F.F.

STOREFRONT ELEVATIONS
TYP.
3'-9" 3'-9"
10'-0"
2'-0" 6'-0"
7'-6"
TYP.

STOREFRONT SYSTEM S3
LINE OF F.F.
2'-0"
2'-0"
18 PROPOSED POINT OF SELL AREA
18 PROPOSED LOCATION FORDISPLAY DESIGNED BY OTHERSMUST COMPLY W/ 11B OF C.B.C.

EXIT
6/8/2022 8:38:09 AM, ARCH E1 (30.00 x 42.00 Inches), Henny July 26, 2022 Regular Meeting of the Lindsay City Council Page 269 SCALE:

PROJECT NO: SHEET:DATE:

No. REVISION DATE

PREPARED BY
PROJECT:

GOVERNING
THESE PLANS SHALL COMPLY WITHTHE 2019 CALIFORNIA BUILDING CODEWHICH ADOPTS THE 2019 CMC, 2019 CPC, 2019 CEC, 2019 CGC, 2019 CRC
AND THE 2019 ENERGY STANDARDSAS WELL AS MUNICIPAL CODE ON

W H I C H T H E P R O J E C T S I T ' S

D E V E L O P E D
DRAFTER:PG. NO.

CONTENT:
|MO+RE|

DESIGN SOLUTIONS

THE USE OF THESE DESIGNS , DRAWINGS, SPECIFICATIONS, AND/OR STRUCTURAL CALCULATIONS IS RESTRICTED TO THE ORIGINAL PURPOSE FOR WHICH THEY WERE PREPARED AND FURNISHED TO THE HOLDER. PUBLICATION IS EXPRESSLY LIMITED TO SUCH USE. OWNERSHIP OF THIS DOCUMENT AND ALL INFORMATION OR DESIGNS CONTAINED HEREIN REMAINS WITH |MO+RE| DESIGN SOLUTIONS ASSOCIATES. REUSE OR OTHER PUBLICATION BY ANY METHOD IS PROHIBITED EXCEPT WITH THE WRITTEN PERMISSION OF |MO+RE| DESIGN SOLUTIONS ASSOCIATES. PROJECT DESIGNER: PROPERTY INFO: SIGNATURE:
14176 AMARGOSA RD. STE C
VICTORVILLE, CA. 92392
WWW.MOREDESIGN.US
EMAIL:[email protected]
PH: (760) 596-7864
PROJECT ADDRESS:
123 HONOLULU ST.

LINDSAY CA, 92347
APN: 205-282-009-000

RIGOBERTO AVALOS REYES
2021-C227
LEGAL DESCRIPTION:

LOT C & WEST 6 LOT B BLK 24
PROPERTY OWNER: RIOS

REFUGIO III & JENNIFER LEE

COMMERCIAL TENANT IMPROVEMENT
6" PLUMBING WALL
21'-1" 22'-0"
16'-0" 6'-0"
85'-11"
70'-5" 7'-6" 8'-0"
129'-0"
39'-0"
6'-6" 7'-10"
14'-4" 24'-8"
9'-10" 13'-1"
7'-5" 5'-8"
22'-0"
9'-0" 21'-9" 8'-3"
68'-7"
R18'-7"
4'-0"
5'-0"
21'-0"
9'-4"
7'-8"
28'-8" 5'-4"
6"
5'-0"
15'-0"
7'-10" 7'-8"
15'-6"
4'-0"
6" 6"
14'-0"
N
15'-0" x 20'-8"
10' CLG.

STORAGE
HS.

UTILITY SINK 3-COMP. SINK MOP SINK W.H. 7'-0" x 9'-0" 10' CLG. SECURITY / OFFICE 10'-0" x 27'-4" STAGE 58'-1" x 39'-0" 12' CLG. LOUNGE 22'-0" x 7'-0" 12' CLG. 6'-8" x 15'-8"
12' CLG.

UTILITY
21'-1" x 39'-0"
12' CLG.

VIP AREA
12'-7" x 6'-0"
10' CLG.
7'-4" x 7'-2"
10' CLG.

RESTROOM 2 7'-4" x 7'-2"
10' CLG.

RESTROOM 3
W.C. LAV. LAV. W.C.
23'-5" x 18'-9"
12' CLG.

FOYER

EXISTING STAIRS
DOWN
6'-8" x 7'-4"
28'-0" CLG.

ELEVATOR
6'-8" 3'-9"
4'-0"
D1
S3
D4 D4
D5
D2
D2
D2
2 16
A-206 / 07 / 2022 KEVIN RAMIREZ 4 OF 21

PROPOSED UPPER LEVEL FLOOR PLAN
D2
6 7
SCALE: 3/16" = 1'-0"
S6
S6
ER
EXIT
ER
ER
S6
(E) STAIR DATA =
RISE = 5.625"RUN = 11"
STEP TOTAL = 32
4 3
3/16" = 1'-0"
2'-6"
FOOD

DISPLAY

PROPOSED UPPER LEVEL FLOOR PLAN
SCALE: 3/16" = 1'-0"
5 5
D2
E6E5E6
6"
S1
5 F4
W1 W7 W8 F2 C1
W1 W7 F2 C1
W1 W4 F4 C4
W1 W4 W8 F2
W1 W7 F2 C4
W1 W7 F2 C1
W1 W6 F4 C3
W1 W7 F2 C1
W8 W7 F2 C1
99 15"

STAIRS UP MIDDLE LANDING STAIRS DOWN

INTERIOR LOWER & UPPER STAIR - ENLARGED FLOOR PLAN
SCALE: 3/8" = 1'-0"
STAIR DATA:

RISE: 5.625"RUN: 11"
STEPS: 32
6'-2"

LANDING
11"
TREAD
11"
TREAD
37'-5"

STAIRS OVERALL WIDTH
3'-9" 33'-8"
30" x 48"
14 12" HANDRAIL EXTENSION AT

LOWER & UPPER LANDING AS
SHOWN
LANDING 15'-0" A.F.F.

C1
C1
W3 W4 W5 F4 C1
W3 W4 W5

DISTRIBUTION
BAR
1 SD-1
P.O.S.

AREA OF
REFUGE

LOWER LANDING UPPER LANDING
3'-9" 13'-9" 6'-2" 14'-0"
2" MIN. - 4" MAX. CONTRASTINGSTRIPE @ STAIR LANDINGS
(TYPICAL AS SHOWN)DASHLINE TO INDICATE FIRE
WALL. SEE FLOOR PLAN FORWALL LEGEND
1-1/2" Ø HANDRAIL TO BE
MOUNTED 34" MIN. - 38" MAX.

ABV. F.F. TO BE SMOOTHAND UNINTERRUPTED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

SLIP RESISTANT MATERIAL

AT ALL TREADS
±14"
±14"

SEE ELEVATORSPECIFICATIONS &
DETAILS ON SHEET A-10

DASHED LINES TOINDICATE ENLARGEDRESTROOMS (SEE SHEET
A-8 FOR REFERENCE
ER
2 6/8/2022 8:27:03 AM, ARCH E1 (30.00 x 42.00 Inches), Henny July 26, 2022 Regular Meeting of the Lindsay City Council Page 270

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-46

Page 1 of 4 ends

NUMBER 22-46
TITLE

MEETING

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LINDSAY APPROVING CONDITIONAL USE PERMIT NO. 22-01, A REQUEST BY

ELEVATE LINDSAY LLC AND COURTNEY CARON TO ALLOW FOR

A CANNABIS DISPENSARY, CULTIVATION, AND CONSUMPTION

LOUNGE WITHIN THE CENTRAL COMMERCIAL ZONE AND RETAIL
CANNABIS DISPENSARY ZONE FOR PROPERTY AT 123 WEST
HONOLULU STREET, LINDSAY, CA 93247.

At a regularly scheduled meeting of the City of Lindsay City Council held on July 26, 2022, at 6:00 PM at 251 E. Honolulu Street, Lindsay, CA 93247 WHEREAS, Conditional Use Permit No. 22-01 was filed pursuant to the regulations contained in Ordinance No. 437, the Zoning Ordinance of the City of Lindsay; and WHEREAS, the City Council of the City of Lindsay, after ten (10) days published notice, did hold a public hearing before said Council on July 26, 2022; and WHEREAS, Planning Staff has prepared necessary investigations and prepared a staff report of information bearing upon the conditional use permit application; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act as the minor alteration of an existing facility (Class 1).

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LINDSAY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. The foregoing recitals are true and correct and are a substantive part of this Resolution.

SECTION 2. The project is categorically exempt from the California Environmental Quality Act as the minor alteration of an existing facility (Class 1).

SECTION 3. The City Council of the City of Lindsay finds that the proposed Conditional Use Permit application is consistent with the provisions of the City of Lindsay Zoning Ordinance (Municipal Code Title 18).

SECTION 4. The site shall meet all City development and State Building Code requirements prior to beginning operations.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 271 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-46

Page 2 of 4 ends

SECTION 5. The business shall meet all State requirements, laws, and regulations for cannabis businesses in the State of California.

SECTION 6. The business shall meet all City requirements, laws, and regulations found in the City’s Municipal Code.

SECTION 7. The business shall pay all fees and taxes imposed by the City of Lindsay.

SECTION 8. Compliance with the Zoning Ordinance and Use Permit Conditions of Approval set forth as follows:
• Building and Safety
o Occupancy. Maximum occupancy shall be determined when building plans have been submitted.
o Trash Enclosure. Ensure all required trash receptacles are hidden from public view.
o Odor Control. An odor control plan certified by a licensed professional engineer shall be submitted along with the building permit application.
o Operations shall comply with all applicable local and state laws.
• Public Safety
o Security cameras with 60 days video retention and storage shall be made available to the Lindsay Department of Public Safety upon request.
• Planning Department
o Site Plan. The use and development of the property shall be in substantial conformance with the illustrative site plan labeled "Lower and upper-level proposed floor plans" submitted on May 15, 2022.
o Parking.
 Provide bicycle parking stalls in accordance with
California Green Code 5.106.4.1.
 Install one Level 3 electric vehicle charging station in accordance with California Green Code Title 24, Part
11, in an agreed upon location along Mirage Avenue
between Honolulu Street and Samoa Street.
 A food truck shall be allowed to park parallel to the curb directly in front of Elevate taking up no more than 3 striped parking spaces between the hours of 8:00 AM
and 10:00 PM excluding Fridays during the Friday
Night Market season and when special events are
taking place Downtown. Except, with a separately
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 272 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-46

Page 3 of 4 ends

executed contract with Virginia Loya, Market
Operator, or the special event coordinator.
• Community Benefit
o Commit at least $10,000 or 1% of gross revenue based on Option #3 (retail, consumption lounge, cultivation) to the proposed Community Benefit's Plan to be implemented based on the recommendations of a Community Panel comprised of residents and local business owners.
o Best effort attempt to hire 100% of employees from Lindsay with hourly wages starting at $16 per hour.
o Provide employees paid opportunities to volunteer with local organizations.
o Host donation drives in support of Lindsay Unified School District and other local organizations.
o Meet with the City Council and City Planning Staff to devise a plan to fund repairs and improvements of City parks.
o Provide funding to the Lindsay Department of Public Safety in support of their enforcement against illegal cannabis
operations.
o Host a monthly "Community Lecture Series" to bring
awareness and education on important topics to local
organizations and residents and provide a donation to the cause.
o Appoint a Community Engagement Liaison that will be the point of contact for local organizations, businesses, and City Staff.
o Membership in at least one local organization, such as the Lindsay Chamber of Commerce, Kiwanis, Rotary Club, etc.

SECTION 9. Failure to comply with any City and State requirements will be considered a violation of the Conditional Use Permit and may result in the revocation of the Conditional Use Permit.

SECTION 10. No use shall emit particulate matter or other air pollutants in excess of the applicable air pollution emission standards of the San Joaquin Valley Air Pollution Control District, the state or of the federal government.

SECTION 11. Security measures shall be implemented to ensure there is a less than significant impact to the City of Lindsay’s Public Safety Department.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 273 ends

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-46

Page 4 of 4 ends

PASSED AND ADOPTED by the City Council of the City of Lindsay as follows:

MEETING DATE July 26, 2022
MOTION

SECOND MOTION
AYES
ABSENT

ABSTAIN
NAYS

CERTIFICATION OF THE FOREGOING RESOLUTION AS FULL, TRUE, PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF LINDSAY AS DETAILED.

FRANCESCA QUINTANA RAMONA CAUDILLO

CITY CLERK MAYOR
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 274 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Neyba Amezcua, Director of City Services & Planning DEPARTMENT:

ITEM NO.:

City Services & Planning

12.1 MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Consider Approval of Fiscal Year 2022-2023 Streets Program.

BACKGROUND | ANALYSIS
The City does not have sufficient resources to execute all desired Capital Improvement Projects each year Fiscal Year. Therefore, the City identifies potential projects and selects which projects to execute depending on the available resources. The recommended listing identifies the program which the City would like to execute throughout the Fiscal Year based on available resources, timing, weather and construction timeframes.

Typical projects consist of street rehabilitation, cape seals, and slurry seals. The estimates include any necessary repairs prior to the final product application which can include replacement or installation of any combination of the following items: sidewalks, curb & gutters, trees, vee gutters, commercial/residential drive approaches, water line services, storm drains, and sewer lines.

Recommended 2022-2023 Streets Program
Remove the following from the previously approved Streets List:

1. Center Street from Sweet Briar to Elmwood Ave. $122,000 Proposed Rehabilitation Project Street List:

1. Ashland St. from Hermosa St. to Apia St. $260,000

2. Fresno St. from HWY 65 to Westwood Ave. $263,000
(Street Only)

3. Westwood from Hermosa to Tulare Rd. $517,000

4. Kern St. from Westwood Ave. to Eastwood Ave. $461,000

5. Van Ness Ave. from Hermosa St. to Mariposa St. $438,000

6. Central Ave. from Hermosa St. to Mariposa St. $438,000

7. Foothill Ave. from Tulare Rd. to Sierra View St. $424,000

8. Tulare Rd. from Foothill to Strathmore Ave. $231,500 (Street Only)
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 275 ends

STAFF REPORT

Page 2 ends

Total $3,032,500
Options for the 2022-2023 Fiscal Year Street Study Session include the following:
• Approve recommended FY 2022-2023 Streets Program.
• Modify FY 2022-2023 Streets Program.
• Do not approve FY 2022-2023 Streets Program and provide direction to staff.

FISCAL IMPACT
The Program Budget is $3,032,500, to be sourced from Fund 200, 265, and 266.

ATTACHMENTS
• None
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 276 ends

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Neyba Amezcua, Director of City Services & Planning DEPARTMENT:

ITEM NO.:

City Services & Planning

12.2 MEETING DATE: July 26, 2022

ACTION & RECOMMENDATION
Consider Approval of Updated Water System Feasibility Study from Provost & Pritchard Consulting Group.

BACKGROUND | ANALYSIS
In November 2013, Provost & Pritchard Consulting Group (“Provost & Pritchard”) completed a Water Feasibility Study (“Study”) for the City of Lindsay (“City”). The Study identified strategies to maintain adequate service levels for the community, provided capital expenditures for the water system, and charted a course for future updates to water rates and connection fees. The City is requesting an updated study due to the length of time that transpired since the completion of the 2013 study and to reflect current conditions as well as capital costs and expenditures. The updated report will then serve as the basis for a funding source application to implement the recommended Capital Improvement Plan (“CIP”) projects. At this time, it is assumed the City will apply for funding through the Drinking Water State Revolving Fund (DWSRF) program with an accompanying funding application that would be formatted to meet the DWSRF requirements.

Provost & Pritchard Consulting Group provided a proposal broken down into two (2) phases:

1. Update Water Feasibility Report : $22,500

2. Prepare Funding Source Application: $22,500
Total Project Cost: $45,000

FISCAL IMPACT
Budget: $75,000. Technical Assistance from The Safe and Affordable Funding for Equity and Resilience (SAFER) program.

ATTACHMENTS
• Provost & Pritchard Proposal
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 277 ends

3387 Bodero Lane
Chico, CA 95973
Tel: (866) 776-6200
www.provostandpritchard.com
\\ppeng.com\pzdata\docs\Marketing\Proposals\2022\City of Lindsay- Water Feasibility Study 22-400\Working Drafts\Lindsay_Water Feasibility Study.docx Engineering  Surveying  Planning  Environmental  GIS  Construction Services  Hydrogeology  Consulting Clovis  Bakersfield  Visalia  Modesto  Los Banos  Chico  Sacramento  Sonora July 6, 2022
Ms. Neyba Amezcua
City of Lindsay
150 North Mirage
Lindsay, CA 93247
Subject: Engineering Services for a Water Feasibility Study, City of Lindsay, California
Dear Ms. Amezcua:

Thank you for the opportunity to submit this proposal to provide engineering services for the subject project. This proposal discusses our understanding of the project, recommends a scope of services together with associated fees, deliverables and approximate schedules, sets forth our assumptions and discusses other services that may be of interest as the project proceeds.

Project Understanding
In November 2013 Provost & Pritchard Consulting Group (Provost & Pritchard) completed a Water Feasibility Study (Study) for the City of Lindsay (City). The Study identified strategies to maintain adequate service levels for the community, provided capital expenditures for the water system, and charted a course for future updates to water rates and connection fees. The City is requesting, due to the length of time that transpired since the completion of the 2013 Study, an update to reflect current conditions and capital costs and expenditures. The updated report will then serve as the basis for a funding source application to implement the recommended capital improvement plan (CIP) projects. At this time, it is assumed the City will apply for funding through the Drinking Water State Revolving Fund (DWSRF) program, and as such the funding application will be formatted to meet the DWSRF requirements.

Scope of Services
Our proposed scope of work for this proposal is segregated into several phases, described below.

Phase UPR: Update Water Feasibility Report
The Study will be updated, using the 2013 Study as a guide, with the most recent data provided by the City. The report will maintain three sections of discussion: background, City characteristics, and the water system. Key areas of the reports that will see updates to information and data include but are not limited to:
• Population - historic, current, and projected
• Land use characteristics
• CIP projects – current and proposed
• Water Supply – capacity, distribution, treatment, source, quantity, and allocations • Water Quality
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 278 ends

Ms. Neyba Amezcua July 6, 2022
Engineering Services for a Water Feasibility Study Page 2 of 4 22-400
\\ppeng.com\pzdata\docs\Marketing\Proposals\2022\City of Lindsay- Water Feasibility Study 22-400\Working Drafts\Lindsay_Water Feasibility Study.docx Description of work under this phase.
• Data coordination and collection with the City, requests will be made via email and uploaded to a OneDrive folder created by Provost & Pritchard. • Prepare a draft and final Water Feasibility Study, that will be available electronically in Adobe PDF and Microsoft Word file formats.
• Project meetings with the City by Microsoft Teams or suitable virtual alternative: two (2) meetings with City staff while updating the report, a (1) meeting to discuss City comments on the draft study, and a (1) meeting with the City after submission of the final report to discuss study recommendations and findings.

Deliverables:
• Project meetings, virtual – agenda and minutes
• Draft and final Water Feasibility Study
Phase APP: Funding Source Application
After acceptance of the final Study by the City, the data within the Study will be used to prepare a funding application. At this time, the format of the funding application will follow the requirements of the (DWSRF) Project Report. The City will provide guidance or direction if a different funding source or format is desired, and may require modifications to this scope of work.

Description of work under this phase.
• Prepare a draft and final funding application report formatted to DWSRF guidelines, that will be available electronically in Adobe PDF and Microsoft Word file formats. • Project meetings with the City by Microsoft Teams or suitable virtual alternative: two (2) meetings with City staff while preparing the funding application and a (1) meeting to discuss City comments on the draft funding application
Deliverables:
• Project meetings, virtual – agenda and minutes
• Draft and final funding application formatted to DWSRF guidelines Professional Fees
Provost & Pritchard Consulting Group will perform the services for this project on a time and materials basis, in accordance with our Standard Fee Schedule in effect at the time services are rendered. These fees will be invoiced monthly as they are accrued, and our total fees, including reimbursable expenses, will not exceed our estimate below without additional authorization.

City of Lindsay
Water Feasibility Study
Phase Estimated Fee
Phase UPR $22,500
Phase APP $22,500
Total Estimated Fee: $45,000
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 279 ends

Ms. Neyba Amezcua July 6, 2022
Engineering Services for a Water Feasibility Study Page 3 of 4 22-400
\\ppeng.com\pzdata\docs\Marketing\Proposals\2022\City of Lindsay- Water Feasibility Study 22-400\Working Drafts\Lindsay_Water Feasibility Study.docx The line items shown above are estimates and are not intended to limit billings for any given Task. Required task effort may vary up or down from the line-item estimates shown, however total billings will not exceed the Total Estimated Fee shown without additional authorization. If the scope changes materially from that described above, as a result of any agency’s decision or because of design changes requested by the City, we will prepare a revised estimate of our fees for your approval before we proceed.

Schedule
Once we receive authorization to begin work on this project and the requested information from the City, we will prepare the draft Study within 6 to 8 weeks. After receipt of the City comments on the draft, we will submit the final Study within four (4) weeks.

After we are authorized to prepare the financial application, we will provide a draft to the City within 6 to 8 weeks. After receipt of the City comments on the draft funding application, we will submit the final funding application within four (4) weeks.

Agency, or other parties not already mentioned, review time is beyond our control. If an additional submittal is required after initial review, we will be prepared to re-submit 2 to 4 weeks after we receive agency comments.

Assumptions
• This proposal is based on utilizing the final report of the City of Lindsay Water Feasibility Study, dated November 2013, as the basis for the updated report. • If selected for this work by the City, a Task Order Approval Form will be issued by the City, refencing our Master Engineering Services Agreement dated February 23, 2021. • Provost & Pritchard budgeted for a total of seven (7) progress calls or video conference calls with the City during the duration of this project. If additional calls or meetings are requested by the City, we will provide those as an additional service at Provost & Pritchard’s regular billing rates.
• Data to be provided by the Client:
o Historic and current water data:
▪ demand - yearly and daily per capita
▪ well supply - rated capacity, status
▪ production - yearly and / or daily
▪ allocation – percent and volume per year
▪ quality – routine sampling results and any ongoing compliance efforts o Current Surface Water Treatment Facility operations
o Acreage summary, by zoning designation
o Water conservation measures that differ from State requirements o Capital Improvement Plan - list of proposed projects and timing • Population estimates will be based on the official 2020 Census data, unless otherwise provided or directed by the City.

July 26, 2022 Regular Meeting of the Lindsay City Council

Page 280 ends

Ms. Neyba Amezcua July 6, 2022
Engineering Services for a Water Feasibility Study Page 4 of 4 22-400
\\ppeng.com\pzdata\docs\Marketing\Proposals\2022\City of Lindsay- Water Feasibility Study 22-400\Working Drafts\Lindsay_Water Feasibility Study.docx • No updates or revisions to the 2013 water system model of the distribution system will occur, unless otherwise directed by the City. If directed, this will require modifications to the above-mentioned scope of work and fee.
• Provost & Pritchard CAD standards and title block will be used for the design of this project.
• Provost & Pritchard’s current CAD version will be used.

Terms and Conditions
If this proposal is acceptable, please provide a Task Order Approval Form and notice to proceed. These documents will serve as our authorization to start the work described in this proposal. This proposal is valid for 60 days from the date above.

Please contact Kirk Koester at (866) 776-6200 or [email protected] if you have any questions or require additional information. We are looking forward to working with the City to complete this important project.

Sincerely,
Provost & Pritchard Consulting Group
Kirk Koester, RCE 88513 Linda G. Sloan, PG 8829, CHG 930 Associate Engineer/Project Manager Director of Operations Terms and Conditions Accepted
By City of Lindsay
Signature Signature
Printed Name Printed Name
Title Date Title Date
July 26, 2022 Regular Meeting of the Lindsay City Council

Page 281 ends
← All documents from this meeting