Cities Index.
Agenda packet

Lomita City Council
February 21, 2023

Document
Agenda packet
Meeting
February 21, 2023
Body
Lomita City Council
Pages
14
Original file
33.2 MB
Text extracted from the city's file for reading and search. Open the original on lomitacity.primegov.com. That file is the official record.

This AGREEMENT for Engineering Services is entered into this 21st day of February 2023, by and between the CITY OF LOMITA, a general law city and municipal corporation (“CITY”) and Stetson Engineers, Inc. (“CONSULTANT”).

R E C I T A L S
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for Engineering Services for the New Groundwater Well Feasibility Study.

C. CONSULTANT warrants to CITY that it has the qualifications, experience, and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONSULTANT to perform the services as described in Exhibit A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONSULTANT agree as follows:

1. CONSIDERATION AND COMPENSATION.

A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A.

B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement.

C. As additional consideration, CITY agrees to pay CONSULTANT an amount not to exceed $63,135, for CONSULTANT’s services, unless otherwise specified by written amendment to this Agreement.

D. No additional compensation shall be paid for any other expenses incurred, unless first approved by the City Manager or his designee.

E. CONSULTANT shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous Attachment No 1
February 21, 2023, Reg CC Mtg., Page #196

Page 2 of 13 ends

month. CITY shall pay CONSULTANT all uncontested amounts set forth in the CONSULTANT'S bill within 30 days after it is received.

2. SCOPE OF SERVICES.

A. CONSULTANT will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement.

3. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONSULTANT are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONSULTANT represents that CONSULTANT has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONSULTANT’s key person assigned to perform work under this Agreement is Jeff Helsley, PE. CONSULTANT shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire upon completion of the work, unless earlier termination occurs under Section 12 of this Agreement or extended in writing in advance by both parties.

8. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized February 21, 2023, Reg CC Mtg., Page #197

Page 3 of 13 ends

in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

9. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number.

10. PERMITS AND LICENSES. CONSULTANT will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

11. PREVAILING WAGES.

A. Prevailing Wage. CONSULTANT is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, CONSULTANT agrees to fully comply with such Prevailing Wage Laws.

Upon request, CITY shall provide CONSULTANT with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

CONSULTANT shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request and shall post copies at the CONSULTANT’S principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code within this Agreement, and CONSULTANT shall therefore comply with such Labor Code sections to the fullest extent required by law. CONSULTANT shall defend, indemnify and hold the CITY, its officials, officers, employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

B. Registration/DIR Compliance. If the services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, CONSULTANT and all subconsultants must be registered with the Department of Industrial Relations (“DIR”). CONSULTANT shall maintain registration for the duration of the project and require the same of any subconsultants. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be CONSULTANT’S February 21, 2023, Reg CC Mtg., Page #198

Page 4 of 13 ends

sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the DIR against CONSULTANT or any subconsultant that affect CONSULTANT’S performance of services, including any delay, shall be CONSULTANT’S sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONSULTANT caused delay and shall not be compensable by CITY. CONSTRUCTION shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONSULTANT or any subconsultant.

C. Labor Certification. By its signature hereunder, CONSULTANT certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code and agrees to comply with such provisions before commencing the performance of the Services.

D. Employment of Apprentices. CONSULTANT and all subconsultants shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONSULTANT or subconsultants may not perform work on a public works project with a subconsultant who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between CONSULTANT and a debarred subconsultant is void as a matter of law. A debarred subconsultant may not receive any public money for performing work as a subconsultant on a public works contract. Any public money that is paid or may have been paid to a debarred subconsultant by CONSULTANT on the project shall be returned to CITY. CONSULTANT shall be responsible for the payment of wages to workers of a debarred subconsultant who has been allowed to work on the Project.

F. CONSULTANT agrees to bind every subconsultant to the terms of the Agreement as far as such terms are applicable to subconsultant’s portion of the work.

CONSULTANT shall be as fully responsible to CITY for the acts and omissions of its subconsultants and of persons either directly or indirectly employed by its subconsultants, as CONSULTANT is for acts and omissions of persons directly employed by CONSULTANT. Nothing contained in these Agreement shall create any contractual relationship between any subconsultant and CITY.

12. TERMINATION.

February 21, 2023, Reg CC Mtg., Page #199

Page 5 of 13 ends

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONSULTANT may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONSULTANT shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONSULTANT shall, at CITY’s option, become CITY’s property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

13. INDEMNIFICATION.

A. CONSULTANT shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorney’s fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONSULTANT's performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONSULTANT’S legal counsel unacceptable, then CONSULTANT shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation.

CONSULTANT shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
i. If CONSULTANT’S obligation to defend, indemnify, and/or hold harmless arises out of CONSULTANT’S performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, CONSULTANT’S indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT, and, upon CONSULTANT obtaining a final adjudication by a court of competent jurisdiction, CONSULTANT’S liability for such claim, including the cost to defend, shall not exceed CONSULTANT’S proportionate percentage of fault.

February 21, 2023, Reg CC Mtg., Page #200

Page 6 of 13 ends

B. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 18, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

14. ASSIGNABILITY. This Agreement is for CONSULTANT’s professional services.

CONSULTANT’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

15. INDEPENDENT CONSULTANT. CITY and CONSULTANT agree that CONSULTANT will act as an independent CONSULTANT and will have control of all work and the manner in which it is performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only.

16. AUDIT OF RECORDS.

A. CONSULTANT agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement. CONSULTANT agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement. CONSULTANT further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONSULTANT will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.

17. CORRECTIVE MEASURES. CONSULTANT will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONSULTANT will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONSULTANT to implement required corrective measures shall result in immediate termination of this Agreement.

18. INSURANCE REQUIREMENTS.

A. CONSULTANT, at CONSULTANT’s own cost and expense, shall procure and February 21, 2023, Reg CC Mtg., Page #201

Page 7 of 13 ends

maintain, for the duration of the contract, the following insurance policies:

1. Workers Compensation Insurance as required by law. CONSULTANT shall require all subconsultants similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONSULTANT for CITY.

2. General Liability Coverage. CONSULTANT shall maintain commercial general liability insurance in an amount of not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONSULTANT shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONSULTANT arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONSULTANT shall maintain professional liability insurance for protection against claims to the extent arising out of the negligent acts, errors, or omissions which may arise from CONSULTANT’S operations under this Agreement, whether such operations be by CONSULTANT or by its employees, subconsultants, or subconsultants. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-peroccurrence basis. When coverage is provided on a “claims made basis,” CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement and will cover CONSULTANT for all claims made by CITY arising out of any negligent acts, errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by CITY, and shall be endorsed as follows.

CONSULTANT also agrees to require all CONSULTANTs, and subconsultants to do likewise.

February 21, 2023, Reg CC Mtg., Page #202

Page 8 of 13 ends

1. “The CITY, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to the commercial general liability and automobile liability arising out of work performed by or on behalf of the CONSULTANT, including materials, parts, or equipment furnished in connection with such work or operations.”

2. The commercial general liability and automobile liability policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers. Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits to not meet the requirements of this Agreement except after thirty (30) days’ written notice has been received by CITY.

C. CONSULTANT agrees to provide prompt notice to CITY of any claim or loss against CONSULTANT arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY’s option, CONSULTANT shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

E. CONSULTANT shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

F. Failure on the part of CONSULTANT to procure or maintain required insurance February 21, 2023, Reg CC Mtg., Page #203

Page 9 of 13 ends

shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 11 above.

G. The commercial general and automobile liability policies required by this Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the CONSULTANT (as the named insured) should CONSULTANT fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONSULTANT understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONSULTANT as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONSULTANT’S behalf upon CONSULTANT’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against CONSULTANT for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

19. USE OF OTHER CONSULTANTS. CONSULTANT must obtain CITY’s prior written approval to use any CONSULTANTs while performing any portion of this Agreement.

Such approval must include approval of the proposed CONSULTANT and the terms of compensation.

20. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONSULTANT of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONSULTANT for anything done, furnished or relating to the CONSULTANT’S work or services. Acceptance of payment shall be any negotiation of CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONSULTANT, its employees, sub-CONSULTANTs and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONSULTANT, its employees, sub-CONSULTANTs and agents.

21. CORRECTIONS. In addition to the above indemnification obligations, the CONSULTANT shall correct, at its expense, all errors in the work which may be disclosed during CITY’S review of CONSULTANT’S report or plans. Should the CONSULTANT fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONSULTANT. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment February 21, 2023, Reg CC Mtg., Page #204

Page 10 of 13 ends

otherwise owed CONSULTANT under this Agreement up to the amount of the cost of correction.

22. NON-APPROPRIATION OF FUNDS. Payments to be made to CONSULTANT by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONSULTANT’S services beyond the current fiscal year, the Agreement shall cover payment for CONSULTANT’S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

23. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONSULTANT
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
ATTN: City Manager
Stetson Engineers, Inc.
861 Village Oaks Drive, Suite 100
Covina, CA 91724
ATTN: Stephen B. Johnson
President / CEO / CFO
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

24. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT’s bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability.

25. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT’s or CITY’s obligations under this Agreement.

February 21, 2023, Reg CC Mtg., Page #205

Page 11 of 13 ends

26. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

27. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

28. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

29. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city administrator, or designee, may execute any such amendment on behalf of CITY.

30. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

31. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.

32. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

33. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

34. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONSULTANT represents that its financial resources, surety and insurance February 21, 2023, Reg CC Mtg., Page #206

Page 12 of 13 ends

experience, service experience, completion ability, personnel, current workload, experience in dealing with private CONSULTANTs, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

35. DISCLOSURE REQUIRED. (CITY and CONSULTANT initials required at one of the following paragraphs)
By their respective initials next to this paragraph, CITY and CONSULTANT hereby acknowledge that CONSULTANT is a “CONSULTANT” for the purposes of the California Political Reform Act because CONSULTANT’S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONSULTANT employed by CITY. CONSULTANT hereby acknowledges his or her assuming-office, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY’S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to CONSULTANT commencing services hereunder, the City’s Manager shall prepare and deliver to CONSULTANT a memorandum detailing the extent of CONSULTANT’S disclosure obligations in accordance with the CITY’S Conflict of Interest Code.

City Initials ______
CONSULTANT Initials ______
OR
By their initials next to this paragraph, CITY and CONSULTANT hereby acknowledge that CONSULTANT is not a “CONSULTANT” for the purpose of the California Political Reform Act because CONSULTANT’S duties and responsibilities are not within the scope of the definition of CONSULTANT in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY’S Conflict of Interest Code.

City Initials ______
CONSULTANT Initials ______
February 21, 2023, Reg CC Mtg., Page #207

Page 13 of 13 ends

IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF LOMITA CONSULTANT
Ryan Smoot, City Manager By: Stephen B. Johnson
ATTEST:

Kathleen Horn Gregory, City Clerk Taxpayer ID No.

APPROVED AS TO FORM:

Trevor Rusin, City Attorney
February 21, 2023, Reg CC Mtg., Page #208

CITY OF LOMITA

REQUEST FOR PROPOSAL (RFP)

ENGINEERING SERVICES
FOR
New Groundwater Well Feasibility Study

RFP DEADLINE
TUESDAY, JANUARY 17, 2023
1:00 P.M.

February 21, 2023, Reg CC Mtg., Page #209
2 TABLE OF CONTENTS

SECTION I

GENERAL
INFORMATION.......................................................................................................................................3

SECTION II
PROPOSAL REQUIREMENTS.................................................................................................................6

SECTION III
SCOPE OF SERVICES...........................................................................................................................11

SECTION IV
SELECTION OF CONSULTANTS .........................................................................................................16 Attachment A – General City Map
Attachment B – City Water Pressure Map
Attachment C – Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well # 5
Attachment D – Professional Services Agreement (Sample) February 21, 2023, Reg CC Mtg., Page #210
1 SECTION I

GENERAL INFORMATION
A. INTRODUCTION / BACKGROUND
The City of Lomita is requesting proposals from qualified and experienced Civil Engineering firm(s) to provide a feasibility study and report for to determine suitable locations for a new groundwater production well.

The City of Lomita is an urban, densely populated 1.97 square miles (total area is 1,261 acres), located at the base of the Palos Verdes Peninsula in the Los Angeles Basin, Los Angeles County. The City of Lomita is located in the southwestern part of Los Angeles County, 26 miles south of downtown Los Angeles and bounded by the City of Torrance on the north and west, the Harbor Region of Los Angeles to the east, and the City of Rolling Hill Estates on the southwest; and the City of Rancho Palos Verdes and unincorporated Los Angeles County area to the southeast. The City is almost completely developed with mostly residential neighborhoods and commercial units.

The City’s water system has one (1) groundwater source well with approximate production capability of 1,500 gallon per minute (GPM), two reservoirs with combined capacity over 5.4 million gallons, and two (2) pressure reducing stations (Appian Way and Monte Vista Pressure Reducing Station). The City’s groundwater well (Well No. 5), located within the Silverado Aquifer, has a depth of 660 feet and is a main component of the Cypress Water Production Facility (CWPF). The CWPF treats Well No. 5 groundwater with an iron-manganese greensand filtration, chlorination, and newly installed granular activated carbon treatment system. The purpose of this treatment system is for disinfection, to remove iron, manganese, and volatile organic compounds, and improve aesthetic qualities.

In 2018, approximately 28% of total water volume delivered to its residents was from Well No. 5, and the remaining 72% was imported from Metropolitan Water District (MWD). Due to the detection of benzene at Well No. 5, the City has been solely reliant on MWD water since May 2019. Lomita Well No. 5 and the CWPF are anticipated to remain offline until construction completes adding granulated activated carbon treatment to the system’s process in early 2023.

In August 2022, the City completed a study that evaluated Skypark Commercial Properties (SCP) impact on groundwater contaminants migrating to Lomita Well No. 5 (see Attachment C). The study area encompassed the SCP sources in the City of Torrance and Lomita within the West Coast Basin, a sub-basin of the Los Angeles Basin. The study concluded that that the benzene impacting Lomita Well No.5 traveled from a near surface source. This finding indicated that Silverado Aquifer, in areas near the well, is vulnerable to vertical downward migration of potential February 21, 2023, Reg CC Mtg., Page #211
2 chlorinated volatile organic compounds (cVOCs) impacts. The main cVOCs of concern affecting the area, and likely to affect siting a new well installation are Trichloroethene (TCE) and Tetrachloroethene (PCE). Due to the limited information outside of the SCPs and the lack of monitoring wells in the area, groundwater flow and all historical and/or future contaminants may not have been identified to date.

B. PROJECT DESCRIPTION

The New Groundwater Well Feasibility Study was included in the City of Lomita CIP Master Plan. The purpose of this study is to minimize the City’s long-term reliance on imported water and provide a contingency well in case of future adverse impacts to Lomita Well No. 5. The City currently has groundwater rights of 1,352-acre feet (ac-ft) in the West Coast Basin. In its last year of normal operations, CY 2018, Well No. 5 produced 561 ac-ft of groundwater. In the past, CWPF blended well-treated water with imported water at ratios of 40%-60%. The blending ratio was established for aesthetic purposes. Additionally, CWPF only supplies Zone 1, approximately 66% of the city. Future studies may consider supplying Zones 2 and 3 by CWPF. The goal of this Study is to identify preliminary locations where a new groundwater source well installation would be feasible. Recommended well locations may be in City limits or neighboring cities.

Following the completion of the Study, the City will elect to either proceed with the next phase to further analyze and perform testing at the recommended locations, or to proceed with the design phase of the new well.

Additionally, the selected Consultant may assist the City in searching, applying, and obtaining grants and allocations from various sources to fund the engineering design and construction phases of this project.

C. DESCRIPTION OF WORK
The purpose of this RFP is to seek the services from an Engineering firm/Consultant to acquire and review groundwater, environmental, hydrogeological, and other historical data to provide site recommendations for the installation of a new groundwater well to serve the City of Lomita.

Services will include, but not be limited to:
• Collect and review existing hydrogeologic data, environmental data, geotechnical data, historical data, and groundwater reports • Utility and permitting research for proposed well sites • Prepare preliminary and final reports, identify recommended well installation sites, provide basis for selecting recommended sites, provide cost estimates, and possible constraints
• Federal and State grant funding research
• Project administration
February 21, 2023, Reg CC Mtg., Page #212
3 • Hold monthly meetings to update City of Lomita staff The contract will be regulated according to the provisions of all Federal, State and local laws and ordinances that are applicable. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code, Section 1775.

F. PROJECT DURATION
The estimated time for to complete this study is four (4) months, which can be subdivided for review as follows:
• One (1) Preliminary Well Feasibility Report
• One (1) Final Well Feasibility Report
One (1) digital pdf, one (1) native digital file, and two (2) physical copies of the Final Well Feasibility Study shall be submitted to the City.

G. PROJECT SCHEDULE
A tentative schedule is included below. The proposals submitted shall use this schedule as a guide to further define an appropriate work schedule in accordance with the requirements of the Scope of Services in Section III. The final schedule will be negotiated based on the final scope of work and work plan agreed to by the City and the selected consultant.

Milestone Date
RFP Release December 15, 2022
Last Day for Questions January 9, 2023
Issue Addendum January 11, 2022
Proposal Deadline January 17, 2023
Consultant Interviews January 24, 2023
Expected City Council Approval February 7, 2023
Kick-off & Notice to Proceed February 15, 2023
*(Dates are estimates)
February 21, 2023, Reg CC Mtg., Page #213
4 SECTION II

PROPOSAL REQUIREMENTS
A. GENERAL
The proposal must be concise, well organized and should demonstrate your firm’s team qualifications and experience related to this project. The proposal shall be printed on 8½" x 11" pages and include resumes, past experience, graphs, tables, etc. It must include the following:

I. Cover Letter (one page): Provide a one-page cover letter, which includes the firm name, name, address, and telephone number of the person(s) to be used for contact who will be authorized to make presentations for the firm. The cover letter must bear the signature of the person authorized to sign on behalf of the proposer and to bind the applicant in a contract. The cover letter will include a statement offering the proposer's acceptance of all conditions listed in the "Request for Proposals" document. Any exception on the Proposer's behalf must be stated in the proposal cover letter.

II. Qualification and Experience (maximum of 10 pages): The proposed Engineering Team shall have experience working with public agencies and/or water purveyors in similar assignments. It is highly desirable that the key project team members have served public agencies in various capacities, are accustomed to working with governmental agencies, have a good understanding of public agency issues, procedures, and policies.

Qualifications and experience to be shown in the proposal shall include, but not be limited to the following:
• Project organizational chart.
• Identification of experience of principal staff members, including major subconsultants. Resumes of principal staff should not exceed one page per person.
• Identify the availability of your team and the percentage of current workload of staff that would be committed to this project, including sub-consultants. • Experience of the firm, the team and subconsultants on similar projects.

III. Scope of Work and Project Approach (maximum 10 pages): The Consultant shall include in their proposal a detailed scope of work and understanding of the process to undertake such a project and complete it in compliance with all applicable rules, regulations, standards and requirements. Other items to include:
• Description of your firm's quality/control (Q/C) and quality/assurance (Q/A) procedures that will be used for the Project.
• Provide a project schedule for various activities by the Engineering Team involved and identify the milestones of major tasks of the Project.

February 21, 2023, Reg CC Mtg., Page #214
5 • Discussion of document control.

IV. Consultant shall submit a fee proposal for the Project in a SEPARATE SEALED ENVELOPE (or separate email attachment) marked “Fee Proposal” along with the Project title. The City will negotiate with the top-ranked consultant in compliance with all applicable federal, state, and local guidelines.

Fee proposal shall include all tasks required to perform the work with a maximum not-to-exceed fee for each task and a grand total not-to-exceed fee.

The fee proposal must contain a task and fee breakdown of all components of cost, including labor base rate, overhead and all other direct and indirect costs.

The fee proposal shall clearly show hours and cost per task. The task and fee breakdown must match the scope of services in the format, as presented within the RFP. The Consultant and all sub-consultants shall not be compensated by the City for any time spent on commuting to or from the Project site and other peripheral work not directly performed as a result of this Project. The Consultant shall provide their services for the duration of the Project for the approved scope of work and fee. The proposal must remain valid for at least 90 days from the due date of this RFP.

The City will short list the list of candidates to three consulting firms, of which it may interview prior to selection of the top candidate for the project.

V. Prevailing wages will apply if the services to be performed meet the criteria according California Department of Industrial Relations web site at:
http://www.dir.ca.gov/dlsr/statistics_research.html. City will not assume any responsibility for Contractor’s failure to pay prevailing wages in accordance with State law.

B. EXAMINATION OF PROPOSAL DOCUMENTS
By submitting a proposal, Consultant represents that it has thoroughly examined and become thoroughly familiar with the work required under this RFP and has the staffing and resources capable of performing quality work to achieve the City’s objectives.

C. ADDENDA
Any changes to the requirements will be made by written addendum to this RFP.

Any written addenda issued pertaining to this RFP shall be incorporated into the terms and conditions of any resulting Agreement. City will not be bound to any modifications to or deviations from the requirements set forth in this RFP as the result of oral instructions. Consultants shall acknowledge receipt of addenda in their proposals.

D. QUESTIONS AND ADDITIONAL INFORMATION
February 21, 2023, Reg CC Mtg., Page #215
6 Questions relating to this RFP shall be emailed to the Public Works Department at:
[email protected] no later than Wednesday, January 9, 2023, at 1:00PM.

E. PROPOSAL SUBMITTAL
Proposals are due on or before Thursday, January 17, 2023, AT 1:00 PM:

One (1) electronic PDF copy of the proposal shall be emailed to the Public Works Department at: [email protected] with Proposal for:

New Groundwater Well Feasibility Study in the email Title.

The Fee Proposals shall be emailed to the Public Works Department at:
[email protected] with Fee Proposal for: New Groundwater Well Feasibility Study
F. INSURANCE REQUIREMENTS
The successful Consultant shall procure and maintain, for the duration of the contract, insurance policies as listed in Section 17 - Insurance Requirements of the attached sample Professional Service Agreement (PSA), attachment B.

All insurance policies must be open to inspection by the City and copies of policies must be submitted to the City and/or upon written request.

G. SELECTION CRITERIA
Responses to this RFP will be evaluated using a point rating system, as shown in Section IV. The evaluation will be completed by a selection committee composed of staff from the Public Works Department.

H. CHANGES IN THE RFP
Should any prospective proposer be in doubt as to the true meaning of any portion of this (RFP), or should the proposer find any ambiguity, inconsistency, or omission therein, the Proposer shall make a written request for an official interpretation or correction. Such requests must be received by the Public Works Department not less than five (5) working days prior to the final date of submittal of the proposals.

Such interpretation or correction, as well as any additional RFP provisions that the City may decide to include, will be made only as an official addendum, and will be sent to each firm recorded as having received a copy of the RFP. Any addendum issued by the City shall become part of the RFP and will be incorporated into the proposal.

February 21, 2023, Reg CC Mtg., Page #216
7 I. DISCLOSURES
Under the Freedom of Information Act (Public Act 442), the City is obligated to permit review of its files, if requested by others. All information in a submitter’s proposal is subject to disclosure under this provision. This act also provides for a complete disclosure of contracts and attachments thereto.

J. POST-SUBMITTAL PROCEDURES
After reviewing and evaluating the proposals that are received, the City will select one or more firms with whom it will negotiate a Professional Services Agreement (PSA).

A sample of the standard PSA is included in Attachment B. Those who wish to submit a proposal to the City are required to carefully review the PSA.

The PSA will include a Scope of Services and Fee Schedule (not-to-exceed amount), both of which may be modified by mutual consent during the negotiation phase. The Insurance Requirements outlined in the PSA may not be revised or changed. Prior to its final execution by the selected firm and the City, the PSA must be submitted to, and approved by, City Council and/or the City Manager.

The City reserves the right to award the total proposal, to reject any and all proposals in whole or in part, and to waive any informality or technical defects if, in the City’s sole judgment, the best interests of the City will be so served.

K. COST LIABILITY
The City of Lomita assumes no responsibility or liability for costs incurred by the Consultant prior to the execution of a Professional Services Agreement. The liability of the City is limited to the terms and conditions outlined in the Agreement.

L. INVOICES
Consultant shall submit invoice(s) at the end of each month for the work performed.

Each invoice at a minimum shall include the following information:

Project name;
Period for which invoice is submitted;
Invoice number;
Task name;
Balance remaining and percent completed for each task;
Total project budget (approved tasks only) and remaining balance; Each employee’s name, hours of work, date, task, rate, and total charge, Invoices must be accompanied by payroll and any other supporting documents that will be necessary to expedite the review and approval process.

February 21, 2023, Reg CC Mtg., Page #217
8 M. GUIDELINES DURING COVID-19 PANDEMIC
Consultants/contractors shall comply with all local, state and federal laws and regulations including, but not limited to, the Governor’s and Los Angeles County Health Officer’s orders and guidance related to COVID-19, social distancing, and best practices.

Consultants/Contractors are required to check with the latest guidelines of the Los Angeles County Public Works and the Los Angeles County Public Health for construction sites during the Coronavirus/COVID-19 pandemic Disclosure: Consultants shall disclose in their responses to any Request for Proposals whether they have been the subject of any legal investigation by County, State, and/or Federal agencies within the past 5 years. If so, each responding consultant shall identify the agency and contact person, the nature of the investigation and any determination over outcome of said investigation. Noncompliance with this section shall result in rejection of the Proposal, but a consultant’s disclosure of any such investigation (even one which resulted in a determination that was adverse to the consultant) will not automatically result in rejection of the Proposal. The occurrence, nature, underlying facts and outcome of any such investigation are not by themselves determinative but are simply included among many factors that will be considered by the City in evaluating Proposals.

February 21, 2023, Reg CC Mtg., Page #218
9 SECTION III

SCOPE OF SERVICES

DESCRIPTION
This RFP is to solicit proposals for engineering services to complete a feasibility study for a new groundwater production well for the City of Lomita. The following scope of work is a minimum suggested scope for the work of the project. The City is seeking a Consultant to produce a preliminary and final report, as well conducting utility and permitting research to identify requirements and constraints for the proposed well sites.

At the direction of the City, the Consultant shall also assist with grant funding research to help fund the design and construction phases of the Project.

The Consultant may provide additional tasks which they feel is pertinent to or adds value to achieving the City’s overall project objectives.

The following tasks include, but are not limited to:

Task 1 – General Project Administration & Meetings
• Consultant shall assign a project manager that will serve as the point of contact and coordinate all communication with the City of Lomita staff. The Consultant must provide an experienced Engineering Team that has knowledge and understanding of local hydrogeology, geotechnical analysis, groundwater well design, and preliminary source assessments.
• Consultant shall coordinate a kick-off meeting with Lomita staff and subconsultants to discuss the scope of the project, develop a work plan to accomplish the project goals, schedule, and identify future constraints. • In addition to the kick-off meeting, the Consultant shall plan for sufficient meetings with Lomita staff to complete the project. Consultant shall prepare agendas for all meetings and submit them to the City two (2) working days prior the meeting for review. For each meeting, Consultant shall record minutes and distribute them within five (5) working days of the meeting. • Consultant shall submit monthly progress reports with each invoice. Progress reports shall contain work performed, project concerns and impacts, and the work anticipated for the next month.

Task 2 – Data Research and Investigation
• Consultant shall review existing public data and acquire additional groundwater, environmental and well monitoring data from pertinent agencies including, but not limited to the Water Replenishment District (WRD), State Water Board, and California Department of Water Resources. The link below provides information regarding public water wells within WRD’s service area. https://gis-apps.wrd.org/Html5Viewer/Index.html?viewer=Well_Search.Well_Search February 21, 2023, Reg CC Mtg., Page #219
10 • Consultant shall conduct investigations at recommended sites to comprehensively analyze the feasibility of a new well installation and the recommended locations.
• Consultant shall contact all agencies with facilities within proposed well sites and request documentation that identify the locations of those facilities. • Consultant shall research and identify all permitting requirements from pertinent agencies for the investigation, design, and drilling/construction operations.
• Consultant shall identify the requirements to construct a well and bring it into service, such as requirements by County Health Department, Water Replenishment District, and the Division of Drinking Water.

Task 3 – Preliminary Well Feasibility Report
• Consultant shall prepare a preliminary well feasibility report that identifies and addresses the following objectives, but is not limited to:
o Recommended site location(s) for new well installation(s).

Consultant shall consider at least three (3) locations; o Engineer’s estimate for design completion, drilling/construction, and annual operation and maintenance costs;
o Permitting requirements and regulations;
o Estimated life cycle ;
o Design and constructability constraints that may be encountered at each site;
o Operation and maintenance considerations at each site; o Theoretical well yield capacity;
o Treatment technology recommendations;
o Recommended field testing needed at each site; and
o Preliminary schedule for procurements and the design and construction phases
Task 4 – Final Well Feasibility Report
• The Final Well Feasibility Report shall not commence without prior authorization from the City of Lomita staff. The Final Report shall address all Staff comments and recommendations as it pertains to the objectives listed in Task 3.

One (1) digital pdf copy, one (1) digital native file copy of the Final Well Feasibility Report, and two (2) bound hard copies shall be submitted to the City.

The following are Optional items of work that shall not be started without authorization from the City of Lomita. The City reserves the right to exercise its option to remove or proceed with the following Tasks.

February 21, 2023, Reg CC Mtg., Page #220
11 Optional Task 5 – Funding Research
• Consultant may assist the City by researching grant/funding opportunities and preparing documentation for applications for the completion of the design and construction phases of the project. Consultant shall assume 30 labor hours of work and coordination for this Task. Work under this task shall include, but not be limited to, researching State and Federal funding opportunities that the City and project qualify for, maintaining communication with funding parties as needed, and the completion of funding applications as needed.

February 21, 2023, Reg CC Mtg., Page #221
12 SECTION IV

SELECTION OF CONSULTANTS
All proposals will be evaluated by a City of Lomita Selection Committee (Committee). The Committee may be composed of City of Lomita staff and other parties that may have expertise or experience in the services described herein. The Committee will review the submittals and will rank the proposals. The evaluation of the proposals shall be within the sole judgment and discretion of the Committee. All contacts during the evaluation phase shall be through the City of Lomita Project Manager only.

The selection committee will review the submitted proposals according to the below evaluation criteria and weighting factors. The committee will then establish a shortlist based on the highest ranked proposals. The shortlist will include enough qualified consultants to ensure that at least three consultants are interviewed.

After the interview, the committee will reestablish a final ranking of the highest ranked consultants. The highest ranked consultant will be selected for the project. Cost proposals for all qualified consultants will be opened and used to begin negotiations, however, with the highest ranked consultant. If an agreement on fees cannot be reached, then negotiations will proceed to the second highest qualified consultant, and so on and so forth until a final agreement is reached with a consultant.

The proposals will be evaluated based on the following:

A. PROFESSIONAL QUALIFICATIONS - 20 points
Identify individuals who will be assigned to this project by name, title and their role on this project. Indicate which of these individuals you consider key to the successful completion of the project. Resumes or qualifications are required for proposed project personnel who will be assigned to the project. Qualifications and capabilities of any sub-consultants shall be included.

B. PAST EXPERIENCE WITH SIMILAR PROJECTS - 30 points
The written proposal must include a list of specific experience in the project design area and indicate proven ability in designing similar projects for the firm and the individuals to be assigned to the project. Experience in groundwater well feasibility studies, well design projects, relevant hydrogeological work, groundwater monitoring and sampling, groundwater resource assessments and investigations, similar municipal water projects and regulatory compliance. The proposal should also indicate the ability to have projects completed within the budgeted amounts. A complete list of client references must be provided for similar projects completed within the last two years. It shall include the February 21, 2023, Reg CC Mtg., Page #222
13 firms/agencies name, address, telephone number, project title, and contact person.

C. PROPOSED WORK PLAN – 40 points
A detailed work plan is to be presented and should outline the overall project understanding, approach, and list all tasks determined to be necessary to accomplish the overall scope of the project. The work plan shall include, but is not to be limited to, the objectives/tasks listed in Section II of the RFP. The work plan shall define resources needed for each task (title and labor hours) and staff persons completing the project element tasks. In addition, the work plan shall include a timeline schedule depicting the sequence and duration of tasks showing how the work will be organized and executed.

The work plan shall be sufficiently detailed and clear to identify the progress milestones, i.e. when project elements, measures, and deliverables are to be completed. Additional project elements suggested by the proposer that are thought to be necessary for the completion of the project are to be included in the work plan and identified as proposer-suggested elements.

Identify all of those, if any, who will be subcontracted to assist you with this project, and the extent of work for which they will be responsible. Include similar reference data for subcontractors and employees as requested above for the main proposer.

Include any other information that you believe to be pertinent but not specifically asked for elsewhere.

D. FEES - 10 points
Submit a fee schedule in a separate sealed envelope with proposal. Fee schedule shall clearly identify each task, number of hours assigned to each task, name and title of individual assigned to each task, hourly rate of each individual, and total hours and total dollar amount for the project.

E. AUTHORIZED NEGOTIATOR
Include the name and phone number of person(s) in the organization authorized to negotiate the Professional Services Agreement with the City.

February 21, 2023, Reg CC Mtg., Page #223
14 ATTACHMENT - A

GENERAL CITY MAP

February 21, 2023, Reg CC Mtg., Page #224
253rd St
Narbonne Ave
Oak St
Lomita Blvd
Oak St
Walnut St
Cypress St
Lomita Blvd
255th St
250th St
Narbonne Ave
Pennsylvania Ave
248th St
Western Ave
263rd St
Pacific Coast Hwy
254th St
253rd St
Feijoa Ave
Palos Verdes Dr N
242nd St
261st St
Eshelman Ave
245th St
Appian Way
Ebony Ln
Regent Ave
Andreo Ave
260th St
251st St
240th St
Rolling Vista Dr
Cayuga Ave
243rd St
Via Madonna
253rd Pl
257th St
256th St
262nd St
Via Desmonde
246th Pl
259th Pl
247th St
246th St
249th St
241st St
Viana Ave
Woodward Ave
Moon Ave
Crenshaw Blvd
Alta Vista Ave
252nd St
Doria Ave
Glentree Dr
247th Pl
Fairview Ave
Dawn St
Turrell St
Lucille Ave
Reed Dr
Bland Pl
Market Pl
Guyson St
Hillworth Ave
Lomita Park Pl
Allbrook St
Kelley Ave
Callison St
Chapman St
Alliene Ave
Nordman St
Steed Ct
Saddle View Rd
Cadiz Dr
Falena Ave
April Ct
Wittick Ct
Avocado St
Via Nova
Esther View Dr
Evans Ct
Hillcrest Ave
Alcor St
Leola St
Benhill Ave
Robin Ln
Forrester Dr
Ocean View Ave
Reed St
Garner St
Via Solano
Stratford Dr
McKenna Ct
Olson Ln
Adamo Ave
Comal Ct
Bani Ave
Abita Ave
Austinbrook Ct
Neko Dr
Noelle Ct
Aubrey Ln
Cypress Circle Dr
Via Tampa
255th St
Lucille Ave
248th St
253rd St
251st St
256th St
248th St
Bani Ave
247th St
246th St
241st St
Doria Ave
247th St
261st St
Alliene Ave
253rd Pl
256th St
259th Pl
254th St
253rd Pl
257th St
262nd St
Woodward Ave
252nd St
259th St
Via Marquette
Monte Vista Ave
Lomita Dr
258th Pl
Ovid Ave 264th St
Hendricks Ave
Stanhurst Ave
Park Haven Pl
Eleanor Pl
Adona Dr
Via Enca nto
Padron Pl
Pennsylvania Dr
Murad Ave
Carlene Ln
Via Vera
Veronica Ln
Monterey Cir
Hillview Ln
Danmar Ct
Ober Ave
Becknel Ave
252nd St
Bani Ave
Appian Way
254th St 254th St
Forrester Dr
February 21, 2023, Reg CC Mtg., Page #225
15 ATTACHMENT - B

CITY WATER PRESSURE MAP
February 21, 2023, Reg CC Mtg., Page #226
LEGEND
ZONE 1
ZONE 2
ZONE 3

CAL WATER

PRESSURE ZONES
FIGURE 3-2

CITY LIMITS BOUNDARY
ZONE 4
February 21, 2023, Reg CC Mtg., Page #227
16 ATTACHMENT - C

HIGH-LEVEL EVALUATION OF POTENTIAL

IMPACTS FROM CHLORINATED SOLVENTS
ON LOMITA WELL #5
February 21, 2023, Reg CC Mtg., Page #228
High-Level Evaluation of Potential Impacts
from Chlorinated Solvents on Lomita Well #5
City of Lomita
30 August 2022
318160-40240
February 21, 2023, Reg CC Mtg., Page #229
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian ii Rev 1: 318160-40240-WW-REP-0001
Disclaimer
This report has been prepared on behalf of and for the exclusive use of City of Lomita, and is subject to and issued in accordance with the agreement between City of Lomita and Advisian (Worley Group Inc.).

Advisian (Worley Group Inc.) accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any third party. Copying this report without the permission of City of Lomita and Advisian (Worley Group Inc.) is not permitted.

Company details
Advisian (Worley Group Inc.)
3621 S. Harbor Boulevard, Suite 100
Santa Ana, CA 92704
USA
T: +1 626 803 9000
February 21, 2023, Reg CC Mtg., Page #230
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian ii Rev 1: 318160-40240-WW-REP-0001
Signatures
This report and Advisian’s work contributing to this report, were reviewed by the undersigned and approved for use.

Exp. 03/31/2024
Mark Trudell
Principal Hydrogeologist
California State Hydrogeologist No. 866
Melanie M. Myden
Senior Hydrogeologist
California State Hydrogeologist No. 1100
Stephanie Botha
Project Manager / Senior Hydrogeologist
Martin Hendrie
Senior Hydrogeologist
February 21, 2023, Reg CC Mtg., Page #231
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian iii Rev 1: 318160-40240-WW-REP-0001
Table of Contents
Acronyms and Abbreviations......................................................................................................................v 1 Introduction.....................................................................................................................................1 Purpose and Scope of Work........................................................................................................................... 1 2 Conceptual Site Model ...................................................................................................................3 Site Location and Land Use............................................................................................................................. 3 Historical Site Information............................................................................................................................... 3 Regional Geologic Setting............................................................................................................................... 4 Regional Hydrogeologic Setting................................................................................................................... 5 Lomita Well #5 ..................................................................................................................................................... 7 Contaminants of Concern (COCs)................................................................................................................. 8 3 Modelling Methodology ..............................................................................................................10 BIOCHLOR Model .............................................................................................................................................10

3.1.1 BIOCHLOR Model Input Parameters .........................................................................................11

3.1.2 Model Calibration.............................................................................................................................14

3.1.3 Sensitivity Analysis and Verification..........................................................................................14 4 Capture Zone Assessment ............................................................................................................17 5 Results and Recommendations....................................................................................................20 Results ...................................................................................................................................................................20 Recommendations............................................................................................................................................22 6 References .....................................................................................................................................24 February 21, 2023, Reg CC Mtg., Page #232
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian iv Rev 1: 318160-40240-WW-REP-0001
Tables within Text
Table 2-1 Regional Geological Stratigraphy in Project Area ........................................................................................ 5 Table 3-1 BIOCHLOR Model Sensitivity Analysis Results .............................................................................................15 Figures within Text
Figure 1-1 Map Showing Location of Skypark Commercial Properties, Lomita Well #5, and Approximate Project Area ...................................................................................................................................... 2 Figure 2-1 Groundwater Flow in the Gage (RWTA) Aquifer ........................................................................................... 6 Figure 2-2 Conceptual Model of Hydrogeological Setting............................................................................................. 7 Figure 2-3 PCE and TCE Concentration Contours in the RWTA, November 2019 (from GE&R 2021a) ........ 9 Figure 3-1 Reaction Sequence of Chlorinated Ethenes (from Parsons 2004)........................................................10 Figure 3-2 Conceptual Diagram of BIOCHLOR Model Setup and Calibration Data ...........................................13 Figure 4-1 Capture Zone Assessment for Lomita Well #5 based on a range of hydraulic conductivity values with a pumping rate of 426.5 gpm.....................................................................................................19 Figure 4-2 Capture Zone Assessment for Lomita Well #5 based on a range of hydraulic conductivity values with a pumping rate of 838 gpm ........................................................................................................19 Figure 5-1 Modeling Results of PCE Concentrations During Steady-State (100 year) Simulation................20 Figure 5-2 Modeling Results of TCE Concentrations During Steady-State (100 year) Simulation................20 Figure 5-3 Modeling Results of PCE Concentrations During Steady-State Simulation of 40 years..............21 Figure 5-4 Modeling Results of TCE Concentrations During Steady-State Simulation of 40 years..............21 Appendix
Appendix A Model Input Parameters
February 21, 2023, Reg CC Mtg., Page #233
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian v Rev 1: 318160-40240-WW-REP-0001
Acronyms and Abbreviations
Acronym/abbreviation Definition
CDWR California Department of Water Resources
COCs Contaminants of Concern
CSM Conceptual Site Model
cVOCs Chlorinated Volatile Organic Compounds
DCE Dichloroethene
DWR Department of Water Resources
FOC Fraction of Organic Carbon
HSC Hi-Shear Corporation
KOC Soil Adsorption Coefficient
MCL Maximum Contaminant Level
PCE Tetrachloroethene
RWQCB Regional Water Quality Control Board
RWTA Regional Water Table Aquifer
SCP Skypark Commercial Properties
SVE Soil Vapor Extraction
SWRCB State Water Resources Control Board
TCE Trichloroethene
TRI Toxic Release Inventory
USGS United States Geological Survey
USEPA United States Environmental Protection Agency
UST Underground Storage Tank
VC Vinyl Chloride
WCBBP West Coast Basin Barrier Project
WRD Water Replenishment District
February 21, 2023, Reg CC Mtg., Page #234
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 1 Rev 1: 318160-40240-WW-REP-0001
1 Introduction
The City of Lomita (the City) contracted Worley Group Inc., operating as Advisian, to conduct a high-level assessment of potential future impacts of chlorinated volatile organic compounds (cVOCs) in groundwater, originating from the Skypark Commercial Properties (the SCPs), on the City’s sole groundwater production well (Lomita Well #5). The locations of the SCPs and Lomita Well #5 is shown in Figure 1-1.

The SCPs include several properties located within a single assessor parcel number (APN No. 7377-006- 906) which is in and owned by the City of Torrance, located approximately 1.25 miles northwest (hydraulically upgradient) of Lomita Well #5.

The SCPs have been under investigation under the oversight of the Regional Water Quality Control Board (RWQCB) since at least 1991, and specifically since 2009 under a California Water Code Section 13267 Investigative Order, to delineate the lateral and vertical extent of cVOCs (i.e., trichloroethene [TCE], tetrachloroethene [PCE], dichloroethene [DCE] and vinyl chloride [VC]), in soil, soil vapor and groundwater.

To date, cVOC impacts have been reported within the Gage aquifer, a regional water table aquifer (RWTA) that is an important water bearing zone in the area. A cVOC plume in groundwater is interpreted to be migrating east-southeast with the RWTA beneath residential properties located east of Crenshaw Boulevard in Lomita, California.

This report provides an overview of the conceptual site model (CSM) and subsequent analytical modelling used to evaluate the long-term fate and transport of cVOCs from the SCPs and potential future impacts on Lomita Well #5.

Purpose and Scope of Work
The following scope of work was conducted to provide a preliminary analysis of potential water quality impacts due to migration of contamination towards Lomita Well #5:
• Review available data/information including current site conceptual model(s), water levels, water quality data, pumping rates and other data as available and applicable to develop an understanding of groundwater flow conditions and contaminant distribution • Develop an analytical model to simulate potential migration of contamination towards Lomita Well #5 • Assess modeling results to evaluate potential travel time and water quality impacts at Lomita Well #5 • Conduct sensitivity analysis simulations to understand potential uncertainty relating to model input parameters and assumptions; and
• Document findings in a brief technical memorandum.

February 21, 2023, Reg CC Mtg., Page #235
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 2 Rev 1: 318160-40240-WW-REP-0001
Figure 1-1 Map Showing Location of Skypark Commercial Properties, Lomita Well #5, and Approximate Project Area Skypark
Commercial
Properties

1.25 miles (approximate)
Lomita Well #5
Approximate
Project Area
February 21, 2023, Reg CC Mtg., Page #236
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 3 Rev 1: 318160-40240-WW-REP-0001
2 Conceptual Site Model
This section contains an overview of the CSM for the Project Area (refer to Figure 1-1). The CSM is based on publicly available data and has been developed to include descriptions of the environmental setting, potential sources, contaminants of concern (COCs), contaminant fate and transport processes and pathways, and potential receptors.

The information summarized below is not intended to provide a comprehensive description of the SCPs or include all historical activities, but to provide context for the CSM that provided the basis of the evaluation herein.

Additional information on environmental conditions and site characterization associated with the SCPs has been documented by numerous authors including the consulting firms Hygienetics, Inc. (1991), SCS Engineers (1991a, 1991b and 1992), Camp Dresser & McGee (1991), Geosyntec Consultants (1995), BBL Environmental Services Inc. (BBL; 2000 and 2001), Environmental Engineering & Contracting, Inc. (EEC; 2008), Winefield & Associates (2010) Alta Environmental (Alta; 2013), Terraphase (2022a and 2022b), and Genesis Engineering and Redevelopment (2021). Historical reports are maintained on the State Water Resources Control Board (SWRCB) GeoTracker website (SWRCB 2022).

Site Location and Land Use
The Project Area encompasses both the City of Torrance (where the SCPs are located) and the City of Lomita (where Lomita Well #5 is located). The Project Area is located in southern Los Angeles County, California, approximately 15 miles south-southwest of downtown Los Angeles.

Land use within the vicinity of the SCPs is a mix of commercial and industrial use and contains the Torrance Municipal Airport. The SCPs are bordered by Skypark Drive on the north, the Pacific Coast Highway on the south and Crenshaw Boulevard to the east. Residential communities within the City are located east and southeast of Crenshaw Boulevard.

As indicated in the City of Lomita Water Master Plan Update (KEC Engineers, Inc. [KEC] 2015), Lomita Well #5 is located at 26112 Cypress Street, Lomita, California, approximately 1.25 miles southeast of the SCPs, as shown on Figure 1-1. The well is the main component of the Cypress Water Production Facility and is located in an area which includes a mixture of commercial and residential properties.

Historical Site Information
The SCPs comprise an approximately 12.25-acre property that is owned by the City of Torrance and has reportedly been occupied by Hi-Shear Corporation (Hi-Shear) and other parties since at least 1954.

Hi-Shear’s primary business is understood to be the manufacture of metal fasteners used in the aerospace industry (BBJ Group and Ramboll 2021 and GE&R 2021a).

Various subsurface features are reported to have existed at the SCPs, including underground storage tanks (USTs) and clarifiers (which included storage of TCE-containing solvents), an industrial wastewater treatment plant, and various above ground storage tanks for plating operations. Historical records also February 21, 2023, Reg CC Mtg., Page #237
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 4 Rev 1: 318160-40240-WW-REP-0001
indicate that Hi-Shear had degreasing units that used PCE, and several spray booths for paints and solvents. Annual Toxic Release Inventory (TRI) Form R reports also indicate that several chemicals (including PCE, TCE, and 1,1,1-Trichloroethane [1,1,1-TCA]) were used at the SCPs (Hygienics 1991; BBJ Group and Ramboll 2021).

The SCPs have been subject to environmental site assessments and investigations since at least 1991, according to records (SWRCB 2022) that indicate a Phase I Environmental Site Assessment was performed by Hygienetics, Inc. in May 1991. The earliest soil and groundwater investigations were performed by Camp Dresser & McKee, Inc. (1991) and SCS Engineers (1991), both of whom reported cVOCs impacts to the shallow soil and groundwater system. The primary COCs include TCE and PCE. Several subsequent site investigations conducted at the SCPs confirmed cVOCs impacts to soil, soil vapor, and groundwater (perched and regional) and aimed to delineate the vertical and lateral extent of contamination, as summarized by BBL (2001), EEC (2008), Winefield & Associates (2010), and GE&R (2021a & b).

In addition to environmental investigation activities, various remediation approaches including soil vapor extraction (SVE) (intermittently since at least 1999 [BBL 2000] and recently restarted), and groundwater remediation (with various phases from pilot to full-scale studies between approximately 2012 and 2017) have been implemented at the SCPs (Alta 2017; Terraphase 2022a and 2022b).

While some source removal of cVOCs has occurred, a groundwater plume remains on-site that extends downgradient from the source area at the SCPs to the east-southeast beneath neighboring properties in the City of Lomita (GE&R 2021a and MK Environmental 2021).

Regional Geologic Setting
The Project Area is located within the West Coast Basin, a sub-basin of the Los Angeles Basin. The West Coast Basin encompasses approximately 140 square miles, extending from the Pacific Ocean southeast to the Palos Verdes Hills, San Pedro Bay, and Orange County (California Department of Water Resources [CDWR] 1961). The West Coast Basin is separated from the Central Basin to the east by the NewportInglewood uplift, a regional anticlinal fold, which extends approximately 40-miles southeast from Beverly Hills to Newport Beach (USGS 2003).

The West Coast Basin contains a series of aquifers and aquicludes. Aquifers are composed of thick, permeable sediments that are a source of water to groundwater wells. The term “aquiclude” describes the less permeable silt and clay layers that separate the aquifers in some locations. The shallowest groundwater underneath the Project Area is an unconfined semi-perched aquifer. This semi-perched aquifer is composed of Recent age marine and estuarine deposits. Beneath the semi-perched aquifer is the Bellflower Aquiclude. Regionally, the Bellflower Aquiclude is approximately 100 to 120 feet (ft) thick and composed of finer-grained sediments (clay, silt, sandy silt, silty sand, clayey sand, sandy clay, and gravelly clay). Where the Bellflower Aquiclude is found, the finer-grained sediments inhibit groundwater movement between the semi-perched aquifer and the underlying Gage Aquifer.

The semi-perched aquifer is underlain by the Upper Pleistocene marine and nonmarine alluvial terrace deposits of the Lakewood Formation, a heterogenous unit dominated by sandy silts and silty sands interbedded with varying thicknesses of sand. The entire Lakewood aquifer system ranges in thickness from 150 to 400 ft and includes the Gage Aquifer system (USGS 2003). The Gage Aquifer is the regional February 21, 2023, Reg CC Mtg., Page #238
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 5 Rev 1: 318160-40240-WW-REP-0001
water table aquifer (RWTA) which underlies the Project Area. It is approximately 200 ft thick near the SCPs and regionally consists primarily of sand with trace amounts of gravel and thin beds of silt and clay.

According to geologic reports, the Bellflower Aquiclude may be absent in the vicinity of the Project Area and aquifers present are thought to be in hydraulic continuity with the surface (CDWR 1961).

The Lakewood Formation is underlain by the Lower Pleistocene San Pedro Formation, which is underlain by the Pliocene Pico Formation. The San Pedro Formation includes the Silverado Aquifer. The uppermost portion of the San Pedro Formation consists of a clay layer between 40 to 100 ft thick which separates the Gage Aquifer and underlying Silverado Aquifer. Although Alta (2012) reports that the clay layer may be locally absent in the Torrance area as noted by Hargis and Associates (1991) in BBL (2002). Reportedly, in this area the Gage and Silverado Aquifers appear to merge. The Silverado Aquifer, the lowermost aquifer of the San Pedro aquifer system, produces the most water in the system and is estimated to be between 250 and 500 ft below the SCPs. The Pico Formation is composed of mostly marine sediments which include interbedded layers of sandstones, siltstones, and mudstones (CDWR 1961).

The Pico Formation is underlain by the Miocene Monterey Shale and Puente Formation. Basement rock beneath this sedimentary sequence is the Catalina schist facies of the Franciscan Formation.

A summary of the regional geological stratigraphy is shown in Table 2-1.

Table 2-1 Regional Geological Stratigraphy in Project Area Age Formation Aquifer/Aquitard
Holocene (Recent)
Active Dune Sand Semi-Perched Aquifer
Alluvium
Bellflower Aquitard
Gaspur/Ballona Aquifer
Upper Pleistocene
Older Dune Sand Semi-Perched Aquifer
Lakewood Formation
Exposition-Artesian Aquifer
Gage Aquifer (200 ft sand aquifer)
Lower Pleistocene San Pedro Formation
Hollydale Aquifer
Jefferson Aquifer
Lynwood Aquifer (400 ft gravel aquifer)
Silverado Aquifer
Sunnyside Aquifer
Lower San Pedro Aquifer
Upper Pliocene Pico Formation
Source: USGS Water Resource Investigation Report 03-4065 (USGS 2003) Regional Hydrogeologic Setting
A review of Bulletin 104 (CDWR 1961) indicates that the RWTA is interpreted to be within the Gage Aquifer. The review suggests a depth to the top of the Gage Aquifer of approximately 60 ft. The RWTA was February 21, 2023, Reg CC Mtg., Page #239
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 6 Rev 1: 318160-40240-WW-REP-0001
encountered during site investigations at the SCPs at approximately 80 to 90 ft below ground surface (bgs) (BBL 2002; Alta 2013; and GE&R 2021a & b) and at 133 to 138 ft bgs near Lomita Well #5 (ETIC 2020 and PIC 2022). Near the SCPs, the RWTA is known to extend to a depth of at least 285 ft bgs, indicating a saturated thickness of at least 190 ft (Alta 2013).

As shown on Figure 2-1, groundwater flow in the RWTA is generally towards the east-southeast direction with a horizontal hydraulic gradient between 0.0008 to 0.004 (with an average of 0.0021) as reported in Alta (2017) and GE&R (2021). The regional groundwater flow direction has not changed since monitoring began (in 1991) and is thought to be impacted by injection of water to the west via the West Coast Barrier Basin Project (WCBBP) and regional groundwater extraction southeast of the SCPs (Alta 2013 and GE&R 2021a). Injection wells in the WCBBP create a north-south trending mound of fresh water from the Los Angeles International Airport area, south to the Palos Verdes Hills. Injection wells also form a protective mound at the Dominguez Gap Barrier located southeast of the Project Area near Wilmington (CDWR 2021).

Figure 2-1 Groundwater Flow in the Gage (RWTA) Aquifer
The Water Replenishment District (WRD) has one nested monitoring well (Lomita #1) within the Project Area. There are six individual zones that are screened as part of the nested monitoring well, including screens installed within (from shallowest to deepest): the Gage (two zones), Lynwood, Silverado (two zones) and Pico Aquifers. Screen depths range from 120 to 1260 ft bgs (WRD 2021). Historically, water February 21, 2023, Reg CC Mtg., Page #240
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 7 Rev 1: 318160-40240-WW-REP-0001
levels in the Silverado Aquifer are generally deeper than those of the Gage Aquifer by approximately 1 to 4 ft (WRD 2021).

In 2002, BBL reported that the vertical groundwater flow gradient in the RWTA observed in cluster wells was directed downward; however, more recent data (Geosyntec 2010) for the cluster wells are inconclusive.

A review of TCE concentrations in one well cluster (BBL 2002) also suggested that chlorinated solvents are primarily migrating laterally through the RWTA versus vertically.

A conceptual model of the hydrogeological setting is shown as Figure 2-2.

Figure 2-2 Conceptual Model of Hydrogeological Setting
Lomita Well #5
The City of Lomita’s only groundwater production well (Lomita Well #5) is located approximately 1.25 miles southeast of the SCPs. Lomita Well #5 was drilled and completed in January 1971, with an approximate production capacity of 1,500 gallons per minute (gpm; Dudek 2022). The well is 660 ft deep and is perforated from 368 to 648 ft bgs within the Silverado Aquifer (KEC 2015). The City currently has adjudicated rights of 1,352 acre-feet of groundwater, annually (WRD 2021a).

In 2018, the Los Angeles Regional Board received notification of a benzene detection in Lomita Well #5.

Analytical testing data from Lomita Well #5 reported concentrations of benzene at 0.54 micrograms per liter (µg/L) in May 2018, 3.2 µg/L in April 2019, and 3.7 µg/L in May 2019, and Lomita Well #5 was subsequently taken off-line. The Los Angeles Regional Board has initiated an investigation to identify the source(s) of benzene impacting Lomita Well #5. Investigations of USTs that were used to store gasoline at several sites located hydraulically upgradient from Lomita Well # 5 haven recently been undertaken; however, to date, the source(s) of benzene in the Silverado Aquifer has not been determined (ETIC 2020 and PIC Environmental Services [PIC] 2022).
~1.25 miles
to SCPs
February 21, 2023, Reg CC Mtg., Page #241
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 8 Rev 1: 318160-40240-WW-REP-0001
Contaminants of Concern (COCs)
Substantial releases of cVOCs (specifically PCE and TCE) have occurred within the SCPs due to activities and infrastructure at the site which have impacted soil, soil vapor and groundwater. Degradation products of PCE and TCE, including cis-1,2-dichloroethene (cis-1,2-DCE), trans-1,2-dichloroethene (trans-1,2-DCE), 1,1-dichloroethene (1,1-DCE) and vinyl chloride (VC) have also been detected above respective screening levels in groundwater. In 1991, the first reported groundwater well (MW-1) was installed within the RWTA at the SCPs. Reported concentrations of PCE, TCE, and 1,1-DCE were 220, 6,600, and 20 µg/L, respectively (Hygienetics 1991).

Since 1991, a number of site investigations have been performed to delineate the source concentration area(s) and plume migration over time. Historical site investigations have consistently shown that cVOCs within the RWTA have migrated as a co-mingled plume east-southeast from the SCPs impacting downgradient properties east of Crenshaw Boulevard (Winefield & Associates 2010; Alta 2016; and GE&R 2021a).

A summary of PCE and TCE concentrations and iso-concentration contours are shown on Figure 2-3. The figure is based on recent data (from November 2019) showing the area of groundwater impacted beneath and downgradient of the SCPs beneath the City of Lomita, east of Crenshaw Boulevard (GE&R 2021a).

February 21, 2023, Reg CC Mtg., Page #242
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 9 Rev 1: 318160-40240-WW-REP-0001
Figure 2-3 PCE and TCE Concentration Contours in the RWTA, November 2019 (from GE&R 2021a) Vertical delineation of groundwater impacts was undertaken in 2021 (GE&R 2021b). As shown on Figure 2-3, PCE and TCE concentrations in the RWTA progressively decrease with depth to concentrations below the maximum contaminant level (MCL) of 5 µg/L at approximately 150 ft bgs. No impacts to the Silverado Aquifer have been reported to date. However, the number of wells installed in this aquifer are limited in the Project Area.

Figure 2-3 PCE and TCE Concentrations with Depth in Groundwater (from GE&R 2021b) February 21, 2023, Reg CC Mtg., Page #243
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 10 Rev 1: 318160-40240-WW-REP-0001
3 Modelling Methodology
BIOCHLOR Model
The analytical model BIOCHLOR (version 2.2), developed by the United States Environmental Protection Agency (USEPA 2000 and 2002), was used to model the fate and transport of cVOCs in the Project Area.

BIOCHLOR is designed to solve the problem of solute transport in uniform (one dimensional, steady state) groundwater flow.

In BIOCHLOR, solute transport is analytically solved using the modified Domenico model (Domenico 1987) with first order biotransformation and source decay. Mechanisms for the transport of solute include advection and three-dimensional dispersion, sorption of the solute onto soil, and biotransformation of the solute from parent to daughter compound via first order decay. BIOCHLOR is specifically designed to model the fate and transport of chlorinated solvents through sequential decay (i.e., the PCE-TCE-DCE-VC sequence).

Biodegradation is an important process in the natural attenuation of chlorinated solvents. The majority of solvent biodegradation occurs by reductive dechlorination (Wiedemeier et al. 1996) as shown in Figure 3-1. Evidence of plume mass reduction is noted at the SCPs through the decreasing abundance of parent compounds (TCE or DCE) relative to degradation products (DCE and VC) at downgradient locations which indicates biodegradation is likely occurring (GE&R 2021a).

Figure 3-1 Reaction Sequence of Chlorinated Ethenes (from Parsons 2004) For the BIOCHLOR model to be applicable, the following key assumptions must be met:
• Uniform Flow: The plume must be contained within a volume of porous media such that the groundwater velocity and dispersivity are relatively constant (i.e., within a single aquifer versus multiple aquifers). In general, this condition is met as the plume is thought to be migrating primarily within the Gage Aquifer (i.e., the RWTA).
• Known Source: A source of known size of sufficient mass to the groundwater flow field so as to maintain constant concentration. Although the size and concentration of the initial source area is unknown, there is sufficient data over a significant timeframe (1991 to 2021) to characterize the source area for the purposes of the evaluation herein.
• First Order Decay Kinetics: The compounds under consideration must transform as a decay chain with first-order kinetics. This is a reasonable assumption for chlorinated solvents. Degradation February 21, 2023, Reg CC Mtg., Page #244
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 11 Rev 1: 318160-40240-WW-REP-0001
coefficients can be selected via the process of model calibration to calibrate to measured solute concentrations.
• Advection Transport: It is assumed within BIOCHLOR that advection is the dominant transport mechanism for cVOCs in groundwater at the Site.

The BIOCHLOR model cannot mathematically accommodate and simulate a single contaminant source both before and after mass-removal remediation (within the same model). The model therefore assumes a non-remediated source, incorporating PCE concentrations at the source which reflect aquifer conditions prior to removal of the contaminant source material. In this manner, the model presents a conservative simulation as it does not account for any reduction in cVOC concentrations that might be realized from historical or proposed removal actions.

3.1.1 BIOCHLOR Model Input Parameters
A summary of all model input parameters is provided in Appendix A and discussed below.

Model Domain and Simulation Timeframe
A definitive source of cVOCs has not been identified; however, data from as early as 1991 indicates that cVOCs were identified within the shallow groundwater system at that time (Hygienetics 1991 and BBL SCS Engineers 1991). It is possible that the cVOCs could date back to a time significantly earlier than 1991 (e.g., manufacturing activities have been occurring at the SCPs since 1954) and therefore, a simulation time of 100 years was initially selected to simulate steady-state conditions.

One source area was modelled for the CSPs based on the CSM. The model source area was configured as a single-planar source the width of the groundwater plume (approximately 280 ft, based on current plume maps; GE&R 2021a) and the thickness of the RWTA interval (190 ft). A modelled area width and length of 280 and 5,000 ft, respectively, was simulated.

It is noted that the width is not necessarily critical to the modeling outcome as the modelling is used to simulate the maximum concentrations along the centerline of the plume (i.e., along the axis of the wells for which the data are modelled).

Hydrogeology
The hydraulic gradient (i) within the source area was estimated from groundwater levels measured between 2013 and 2019 (GE&R 2021a). The groundwater flow direction (east to southeast) and hydraulic gradient have remained relatively unchanged since groundwater monitoring began in 1991 based on the available data. An average hydraulic gradient of 0.0021 ft/ft was used for all simulations (as noted in Section 2.4).

Aquifer tests at the SCPs have yielded hydraulic conductivity (K) values that range in magnitude from 2.4 to 4 ft/day (BBL 2002) up to 46 to 58 ft/day (Alta 2013). The modelled K-values were varied over two orders of magnitude within a range consistent with reported values. An assumed effective porosity (ne) consistent with that of silty sands to clean sands (0.25; Gibb et al. 1984) was used for all simulations.

February 21, 2023, Reg CC Mtg., Page #245
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 12 Rev 1: 318160-40240-WW-REP-0001
As discussed above, the mean K, I, and ne values were used as inputs to the model to determine seepage velocity (v).

Dispersion
Dispersion was calculated in the model based on the observed length of the plume using data from November 2019 (GE&R 2021a). Concentrations of TCE and PCE were observed downgradient of the assumed source area in shallow monitoring wells MW-28 (49 μg/L) and MW-21 (41 μg/L) but were not detected in monitoring wells MW-25, MW-27, MW-26, or MW-36 (all located along Pennsylvania Avenue).

Based on the reported non-detectable concentrations at these wells from 2019 data (GE&R 2021), a plume length of approximately 2,000 ft was estimated for the purposes of this evaluation.

A fixed value for the longitudinal dispersivity (10 percent of the plume length), based on data summarized in Aziz et al. (2000), was employed. Transverse dispersivity was assumed to be 30 percent (0.30) and vertical dispersivity was assumed to be five percent (0.05) of the longitudinal dispersivity, respectively (Aziz and Newell 2002).

Rate Constants (Adsorption and Biotransformation)
Source area concentrations are expected to decrease through mass lost due to advection out of the source area, volatilization, and chemical and biologic degradation processes. A non-decaying source area was used in the BIOCHLOR. Source decay is described by a constant (ks) and accounts for all of the processes that reduce the source area concentration and is different from the biodegradation rate (λ), which only addresses the rate of biologic transformation.

Biodegradation rate constants were estimated using literature data and field data from existing monitoring wells (e.g., MW-18, MW-12, MW-28, and MW-36). These wells were used to define the approximate plume centerline, as shown on Figure 3-2. Rate constants were estimated through calibration of the BIOCHLOR model to cVOC concentration data from monitoring wells near the plume centerline. As field data to date indicates that only the Gage (RWTA) aquifer has been impacted, only cVOC data from RWTA wells were used. In addition, data were used only from wells in the part of the plume deemed to be anaerobic (i.e., dissolved oxygen values less than 1 mg/L).

To define a model retardation factor for the modeled cVOCs, the retardation factor was calculated within BIOCHLOR based on the soil bulk density, fraction organic carbon (Foc), and partition coefficient values. All parameters were initially assumed based on literature values as defined in Appendix A. As noted above, rate constants were estimated by adjusting values within literature ranges until the BIOCHLOR concentration predictions reasonably matched the field data.

February 21, 2023, Reg CC Mtg., Page #246
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 13 Rev 1: 318160-40240-WW-REP-0001
Figure 3-2 Conceptual Diagram of BIOCHLOR Model Setup and Calibration Data Source Area Concentrations and Field Data
Source area concentrations were based on data provided in the initial site investigation reports (Hygienetics 1991 and CDM 1991). A single monitoring well (MW-1) was installed within the RWTA and reported concentrations were above referenced guideline values for PCE (220 μg/L), TCE (6,600 μg/L), 1,1,1-TCA (6 μg/L), and 1,1-DCE (20 μg/L). For this evaluation, it is assumed that the initial source concentrations would be similar to (or within an order of magnitude) to the values reported in 1991 at MW-1.

Field data from the most recent site conceptual model report (GE&R 2021a) were used to calibrate the model. Concentrations of PCE, TCE, DCE and VC at monitoring wells MW-18 (proximal to the assumed source area), MW-12 (750 ft), MW-28 (1,500 ft), and MW-36 (2,425 ft), located downgradient of the assumed source area and along the plume centerline, as reported in GE&R (2021a) were used to calibrate the model.

February 21, 2023, Reg CC Mtg., Page #247
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 14 Rev 1: 318160-40240-WW-REP-0001

3.1.2 Model Calibration
Model calibration involved finding a set of fate and transport parameters that result in the BIOCHLOR model output producing a reasonable match to the plume concentration distribution as measured in the field. The BIOCHLOR model was calibrated using a deterministic approach to represent current site conditions assuming steady-state groundwater flow. It is noted that the model calibration does not account for active groundwater remediation that has occurred on site but does account for biodegradation of the source.

PCE and TCE are considered the primary COCs and therefore the model calibration focused on the PCE and TCE plumes. To represent current site conditions, PCE and TCE concentration data from monitoring wells located within the assumed source area and along the centerline axis of the plume (MW-18, MW-12, MW-28, and MW-36) were used to compare against the simulation results.

Adjustments were made to the seepage velocity parameters (i.e., K and i) within range of reported values and the biotransformation (degradation) rates were adjusted for each cVOC.

For PCE, the match between simulated and observed concentrations indicate the model is generally able to reproduce field conditions under the given assumptions.

For TCE, during the initial calibration process, there was discrepancy between the model results and field data. In reviewing the model results and field data it became apparent that reported concentrations of TCE at MW-1 in 1991 (6,600 μg/L) were two orders of magnitude lower than reported concentrations at MW-3 (25,000 μg/L) in 2001 (BBL 2001), which is an indication that the original source concentration was likely much higher than that reported in 1991 or that there is more than one contributing source. Thus, the source concentration value for TCE in BIOCHLOR was increased to 70 mg/L which provided a better fit to the TCE field data.

It is noted that the model generally overestimates biodegradation in the area of the plume near the source zone and underestimates biodegradation at the leading edge of the plume. This suggests that the modelled biodegradation rate may be higher than is actually occurring in some areas or that previous remediation activities at the SCPs have affected TCE concentrations (which is to be expected). It is also noted, the TCE degradation rate used during the model runs is an averaged estimate for the entire plume; however, because the plume is heterogeneous in terms of the degradation rate in different portions of the plume, this averaged estimate is associated with some degree of uncertainty. The uncertainties in other transport parameters (e.g., use of an average K value and hydraulic gradient for the entire site when in reality heterogeneities exist) could also cause the difference between simulated and observed concentrations of TCE.

3.1.3 Sensitivity Analysis and Verification
Sensitivity analysis of the model was performed to assess the variation in results within a reasonable range of input parameters. Sensitivity analyses were conducted by varying one parameter per simulation over a range of values. There is overlap between the model calibration step and sensitivity analysis in that sensitivity analysis is conducted both during calibration (the past) and can be conducted for predictions February 21, 2023, Reg CC Mtg., Page #248
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 15 Rev 1: 318160-40240-WW-REP-0001
(the future). If a parameter input is adjusted during calibration and that change in value does not affect the model calibration, then that parameter is not considered to be sensitive.

For the BIOCHLOR model, a number of parameters can affect the model including source concentrations, soil Foc and organic carbon partitioning coefficients (which together determine the retardation factor for adsorption/advection), seepage velocity, and the degradation constant(s).

The sensitivity analysis involved changing these parameters and comparing the resulting predicted plume length with the calibrated model results. A summary of sensitivity runs performed is discussed in the subsections which follow and the variation on model results for PCE concentrations are shown in Table 3-1.

Table 3-1 BIOCHLOR Model Sensitivity Analysis Results
Sensitivity
Parameters
Distance from Source (in ft)
0 750 1500 2425
Concentration of PCE in mg/L
Field Data
(GE&R 2021a) 0.250 0.100 0.049 ND
Calibrated Model 0.220 0.098 0.051 0.027
Seepage = 1564.4 ft/yr 0.220 0.128 0.089 0.067
Seepage = 15.6 ft/yr 0.220 0.021 0.001 0.000
Seepage = 156.4 ft/yr
Foc = 0.01 0.220 0.094 0.039 0.007
Seepage =156.4 ft/yr
Foc = 0.0001 0.220 0.098 0.051 0.027
Seepage = 156.4 ft/yr
lambda = 0
(no degradation)

0.220 0.132 0.095 0.075
Notes: ND – Non-Detectable Concentration
Foc and Retardation Factor
There were no site-specific data available for Foc values, therefore the model default value (0.001) was used. The Foc parameter has a direct effect on the retardation factor.

February 21, 2023, Reg CC Mtg., Page #249
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 16 Rev 1: 318160-40240-WW-REP-0001
For the sensitivity analysis, the model-default value for Foc (0.001) was adjusted an order of magnitude larger (0.01) and smaller (0.0001) to assess how the predicted plume changed in length and concentration with changing retardation values.

Seepage Velocity
Seepage velocity was used as a calibration parameter. During the calibration step, it was noted that changing the seepage velocity while keeping other parameters constant could significantly change the plume length prediction. It is unlikely that the entire modeled area has a single seepage velocity (as assumed by BIOCHLOR), thus a sensitivity analysis on seepage velocity is warranted.

As determined during calibration, a seepage velocity of 156.4 ft/year provides a reasonable match for the field data. For the sensitivity analysis, the seepage velocity was increased and decreased by a factor of 10 to evaluate resulting changes in plume magnitude.

Degradation Constant (PCE to TCE)
The calibration step also indicated that the degradation constant is a sensitive parameter as small changes to it created relatively large changes in the predicted concentrations along the centerline of the plume.

As determined in calibration, degradation constants (lambda) of 0.07 (TCE), 0.693 (PCE), 13.86 (DCE), and

1.733 (VC) yr-1 provide a match between model results and the field data. These values were based on ranges of degradation constants provided in Wiedemeier et al. (1999) and adjusted to match field data.

For the sensitivity analysis, the degradation constants were decreased to zero (i.e., no biotransformation occurring) to evaluate resulting changes in plume magnitude.

February 21, 2023, Reg CC Mtg., Page #250
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 17 Rev 1: 318160-40240-WW-REP-0001
4 Capture Zone Assessment
Assessing the capture zone of Lomita Well #5 (i.e., the Silverado Aquifer) is an important part of determining the well vulnerability as contamination present within the capture zone of a production well is likely to be drawn towards the well. Although Lomita Well #5 is screened within the Silverado Aquifer (i.e., deeper than the RWTA), historical reports suggest that the clay layer which separates the Gage Aquifer and underlying Silverado Aquifer may be absent in the Torrance area, and that the Gage (RWTA) and Silverado Aquifers merge (as noted in Section 2.3). In areas where the clay layer (i.e., the aquitard separating the RWTA and Silverado) is absent, the Silverado is vulnerable to potential cVOCs migrating downward from the RWTA.

A capture zone is generally defined as the areal extent of groundwater that is supplied to a pumping production well based on a time of travel criteria (e.g., 2, 5 or 10 years; Fitts 2013). The shape and extension of the capture zone is defined by the geometry and hydrogeologic properties of the pumped aquifer and associated boundary conditions (Feyen et. al 2001).

A semi-analytical model was used to estimate the capture zone dimensions for steady-state pumping of Lomita Well #5. The key assumptions for the capture zone analysis are as follows:
• the aquifer is homogeneous, isotropic, and infinite in horizontal extent • a uniform regional hydraulic gradient is present
• a constant well pumping rate
• uniform flow (i.e., steady-state conditions)
• the confining layer prevents leakage between the unconfined aquifer (the Gage Aquifer) and the underlying confined aquifer (the Silverado Aquifer); and • vertical gradients are negligible.

The saturated thickness of the Silverado Aquifer is estimated to be 245 ft thick based on regional water level measurements and estimated depth to the base of the aquifer (WRD 2022). For the Silverado Aquifer, a hydraulic gradient of 0.004 ft/ft was derived using regional water levels measured in September 2021 at WRD monitoring Wells Lomita 1 and PM-3 Madrid, located within the Project Area (WRD 2021b).

An aquifer test has not been performed on Lomita Well #5; thus, hydraulic conductivity and transmissivity values are not available for the well. Slug tests conducted on USGS monitoring wells within the West Coast Basin reported hydraulic conductivity values between 3 to 70 ft/day (USGS 2002 and 2003). Due to the uncertainty of hydraulic parameters, capture zone calculations were performed using a range of hydraulic conductivity values (from 25 to 75 ft/day) to provide a range of output parameters (i.e., stagnation point and capture zone width).

Using an average extraction rate of 426.5 gpm (based on the highest pumping rate at Lomita Well #5 from 2014 to 2018) and a bulk horizontal hydraulic conductivity of 25 to 75 ft/day, the modeled downgradient stagnation point ranges from 533 to 178 ft and the maximum width of the upgradient capture zone ranges from approximately 1675 to 560 ft, as shown in Figure 4-1.

February 21, 2023, Reg CC Mtg., Page #251
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 18 Rev 1: 318160-40240-WW-REP-0001
For the scenario where pumping is increased to the City’s full adjudicated rate of 1,352 acre-feet per year, the maximum pumping rate would increase to 838 gpm. For this scenario, the modeled capture zone width would increase, with estimates ranging between to 1,097 ft to 3,292 ft, for hydraulic conductivity values of 75 ft/day and 25 ft/day, respectively, as shown on Figure 4-2.

February 21, 2023, Reg CC Mtg., Page #252
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 19 Rev 1: 318160-40240-WW-REP-0001
Figure 4-1 Capture Zone Assessment for Lomita Well #5 based on a range of hydraulic conductivity values with a pumping rate of 426.5 gpm
Figure 4-2 Capture Zone Assessment for Lomita Well #5 based on a range of hydraulic conductivity values with a pumping rate of 838 gpm
-2000
-1500
-1000
-500
0 500
1000
1500
2000
-2000 0 2000 4000 6000 8000 10000 12000
Width (ft)
Distance Upgradient (ft)
Lomita Well #5 K = 25 ft/day K = 50 ft/day K = 75 ft/day Flow Direction
-4000
-3000
-2000
-1000
0 1000
2000
3000
4000
Width (ft)
-5000 0 5000 10000 15000 20000 25000
Distance Upgradient (ft)
Lomita Well #5 K = 25 ft/day K = 50 ft/day K = 75 ft/day Flow Direction
February 21, 2023, Reg CC Mtg., Page #253
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 20 Rev 1: 318160-40240-WW-REP-0001
5 Results and Recommendations
Results
Results of the BIOCHLOR steady-state (100 year) simulation are summarized on Figure 5-1 and Figure 5-2, which show concentrations of PCE and TCE, respectively, versus distance from the assumed source (in ft).

PCE and TCE are regulated contaminants with an established Maximum Contaminant Level (MCL) for drinking water at 0.005 milligrams per liter (mg/L). Results from the steady-state model show that with a continuous source of PCE over time, concentrations of PCE remain above the MCL beyond 5,000 ft from the assumed source area (Figure 5-1), while TCE concentrations decrease to below the MCL approximately 3,300 ft beyond the assumed source area (Figure 5-2). The assumed source area is approximately 1.25 miles (approximately 6,600 feet) from Lomita Well #5, although it not located directly along the centerline of the plume (as shown previously on Figure 3-2).

Figure 5-1 Modeling Results of PCE Concentrations During Steady-State (100 year) Simulation Figure 5-2 Modeling Results of TCE Concentrations During Steady-State (100 year) Simulation February 21, 2023, Reg CC Mtg., Page #254
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 21 Rev 1: 318160-40240-WW-REP-0001
A simulation run of 40 years (i.e., 1991 to 2031) predicts that the PCE concentration above the MCL (0.005 mg/L) may migrate from the original source to a total distance of approximately 4,500 ft within the next 10 to 20 years (Figure 5-3) and that TCE above the MCL may migrate as far as 3,300 ft (Figure 5-4).

Although Lomita Well #5 is not directly downgradient of the source (i.e., along the plume centerline), the capture zone of the production well may overlap with the predicted plume margins, most notably if the pumping rate at Lomita Well #5 is increased to the full adjudicated rate, hydraulic conductivity values of the Silverado Aquifer are higher than assumed, or the groundwater flow direction is more southerly than anticipated. Both scenarios assume no source control and/or remediation occurs at the SCPs.

Figure 5-3 Modeling Results of PCE Concentrations During Steady-State Simulation of 40 years Figure 5-4 Modeling Results of TCE Concentrations During Steady-State Simulation of 40 years Overall, based on the data available and assumptions summarized above, results of the BIOCHLOR model predict that there is a potential for unmitigated cVOCs to reach the capture zone of Lomita Well #5 at concentrations above the current MCL within the next 10 to 20 years. However, the potential travel times of cVOCs within the capture zone to Lomita Well #5 have not been estimated and are outside the scope of this report.

February 21, 2023, Reg CC Mtg., Page #255
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 22 Rev 1: 318160-40240-WW-REP-0001
Recent benzene impacts at Lomita Well #5 also indicate that the well may be susceptible to groundwater contamination. Although the source of benzene has not yet been identified, it is inferred that benzene impacting Lomita Well #5 traveled from a near surface source (i.e., an UST or surface spill), which would indicate that the Silverado Aquifer near Lomita Well #5 is also vulnerable to vertical downward migration of potential cVOC impacts. However, there is currently no indication that cVOCs have migrated vertically from the Gage Aquifer to the Silverado Aquifer at the SCPs since deep monitoring wells at the SCPs have reported non-detectable concentrations of cVOCs since their installation (BBL 2001 and GE&R 2021b).

Although the predicted migration of the cVOC plume within the Gage Aquifer reaches the capture zone of Lomita Well #5 over time, there is uncertainty with respect to the hydraulic connectivity between the Gage Aquifer and Silverado Aquifer within the Project Area. Notably, there is uncertainty as to whether the cVOCs would travel vertically through the aquitard underlying the Gage Aquifer and then into the Silverado Aquifer, and if so, what the estimated travel time(s) would be. Data from WRD’s Lomita Well #1 indicates that there is a downward vertical hydraulic gradient (i.e., between the Gage and Silverado Aquifers) near Lomita Well #5 (WRD 2021b); however, there are a number of data gaps that reduce the certainty of assessing the risk of contamination, including:
• There is limited information outside of the SCPs to determine local groundwater flow directions of the Gage Aquifer and Silverado Aquifer within the Project Area. Regionally, groundwater flow direction is influenced by the WCBBP (west of the Project Area) and by the Dominguez Barrier Wall (east of the Project Area); however, how these influences affect local groundwater flow are uncertain in the Project Area.
• There are a limited number of deep monitoring wells and geological cross-sections within the region which leads to uncertainty as to whether the regional aquitard is laterally extensive across the Project Area. If there are areas where the aquitard does not exist (i.e., areas where the Gage and Silverado Aquifers merge) or areas of higher hydraulic conductivity, there is potential for the cVOCs to preferentially migrate vertically into the Silverado Aquifer. • The limited number of deep monitoring wells (i.e., wells screened across the Silverado Aquifer) also means there is the potential that historical and/or future contaminant source(s) and/or pathways may not have been identified to date.
• The effects of pumping on the hydraulic gradient between the Gage Aquifer and Silverado Aquifer is currently unknown but may influence the lateral and vertical migration of cVOCs within the capture zone of Lomita Well #5.

Recommendations
Based on the data available, current CSM and evaluation results, the potential for cVOCs to migrate to within the capture zone of Lomita Well #5 exists, most notably if pumping rates at the production well increase, if there are areas where the aquitard between the RWTA and Silverado Aquifer does not exist, and/or if remediation of the source area does not occur.

To monitor for potential future impacts to the City’s only production well, the following recommendations are made:

February 21, 2023, Reg CC Mtg., Page #256
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 23 Rev 1: 318160-40240-WW-REP-0001
• The CSM and evaluation should be updated as new data becomes available. It is recommended that the CSM be updated every two to three years as new data becomes available to confirm migration of the cVOCs (e.g., travel times or pathways) has not changed significantly. • A monitoring well network (i.e., sentry wells), installed along the edge of Lomita Well #5’s 5-year capture zone, is needed to confirm assumptions used herein, address existing data gaps within the current CSM, and protect the public water supply.
• The monitoring well network should consist of a minimum of one nested well which includes a piezometer in each target aquifer (e.g., the Gage Aquifer, Lynwood Aquifer, and Silverado Aquifer) to assess changes in water level elevations and water quality over time. The monitoring well(s) could also be used to evaluate hydrogeologic conditions near Lomita Well #5 (e.g., hydraulic gradients and hydraulic conductivity values).
• A suitable location for an additional production (water supply) well should be identified. A second production well would provide a contingency well in case of future adverse impacts to Lomita Well #5 and could also be used to supplement the City’s current water supply.

February 21, 2023, Reg CC Mtg., Page #257
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 24 Rev 1: 318160-40240-WW-REP-0001
6 References
Alta (Alta Environmental). 2012. Conceptual Groundwater Remedial Action Plan. Prepared for Hi-Shear Corporation. Project No. LAP-12-0698. February 2012.

Alta (Alta Environmental). 2013. Aquifer Test Report. Prepared for Hi-Shear Corporation. Project No. LAP12-11931. June 2013.

Alta (Alta Environmental). 2016. Interim Offsite Assessment Report. Prepared for Hi-Shear Corporation.

Project No. LAP-16-5857. Prepared September 2016.

Alta (Alta Environmental). 2017. Groundwater Remedial Implementation Report. Prepared for Hi-Shear Corporation. Project No. LAP-17-6606. Prepared September 2017.

Aziz, C.E., Smith, A.P., and Newell, C.J. 2000. BIOCHLOR Chlorinated Solvent Plume Database. Air Force Center for Environmental Excellence. Prepared June 2000.

Aziz, C.E., Newell, C.J., Gonzales, J.R., Haas, P., Clement, T.P., and Sun, Y. 2000. BIOCHLOR Natural Attenuation Decision Support System Users’ Manual Version 1.0. USEPA, Office of Research and Development. EPA/600/R-00/008. January 2000.

BBJ & Ramboll (BBJ Group, LLC and Ramboll US Consulting, Inc.). 2021. Preliminary Site Conceptual Model Report. East Adjacent Property 1. 24751/24777 Crenshaw Boulevard. Torrance, California. Prepared for Esterline Technologies Corporation. Prepared September 2021.

BBL (BBL Environmental Services Inc.). 2000. Hi-Shear Torrance Site. Remediation Status Update.

BBL (BBL Environmental Services Inc.). 2001. Letter Transmittal re: Deep Soils and Groundwater Investigations Progress. BBLES Project No. 66205.08 #2. Prepared September 2001.

BBL (BBL Environmental Services Inc.). 2002. Deep Zone Soil Investigation. 2600 Skypark Drive, Torrance, California. Project No. 66205/10 #6. Prepared April 2002.

CDM (Camp Dresser & McKee, Inc.). 1991. Report of Subsurface Soil Investigation at Hi-Shear Torrance Facility. Prepared May 1991.

CDWR (California Department of Water Resources). 1961. Planned Utilization of the Ground Water Basins of the Coastal Plain of Los Angeles County. Bulletin 104.

CDWR (California Department of Water Resources). 2021. California’s Groundwater. Bulletin 118. Update 2020.

Domenico, P.A. 1987. An analytical model for multidimensional transport of a decaying contaminant species. Journal of Hydrology. Vol. 91, Issue 1-2, pp 49-59. May 1987.

Dudek. 2022. Water Master Plan. Summary Report. Prepared for City of Lomita. January 2022.

EEC (Environmental Engineering & Contracting, Inc.). 2008. Phase II Subsurface Site Investigation Report.

Lisi Aerospace. EEC Job S1904.01T. September 2008.

February 21, 2023, Reg CC Mtg., Page #258
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 25 Rev 1: 318160-40240-WW-REP-0001
ETIC. 2020. Well Installation and Semi-Annual Groundwater Monitoring Report. Pacific Shell Service Station / Former Mobil Service Station 18MRC. Prepared for ExxonMobil Oil Corporation and Hanukah, Inc.

Project No. 20-018MRC. Prepared December 2020.

Feyen, L., Beven, K.J., Smedt, F.D., Freer, J. 2001. Stochastic capture zone delineation within the generalized likelihood uncertainty estimation methodology: Conditioning on head observations: Water Resources Research, v.37, no.3, p.625-638, doi: 10.1029/2000WR900351.

Fitts, C.R. 2013. Groundwater Science (Second Edition): Boston, Academic Press, 671 p.

GE&R (Genesis Engineering and Redevelopment). 2021a. On-Site Vertical Groundwater Investigation Report. On Behalf of Hi-Shear Corporation. Prepared August 2021.

GE&R (Genesis Engineering and Redevelopment). 2021b. Updated Site Conceptual Model. Skypark Commercial Properties. On Behalf of Hi-Shear Corporation. Prepared November 2021.

Geosyntec Consultants. 1995. Environmental Site Evaluation. Hi-Shear Corporation Facility. Torrance, California. Prepared September 1995.

Geosyntec Consultants. 2010. Tri-Annual Groundwater Monitoring Report, September 2009 – December 2009. Prepared for Hi-Shear Corporation. 2600 Skypark Drive, Torrance, California. Prepared January 2010.

Gibb, J.P., Barcelona, M.J., Richey, M.H. 1984. Effective Porosity of Geologic Materials. Champaign, Illinois.

Print.

Hygienetics, Inc. 1991. Environmental Site Assessment. High-Shear Corporation. Fastener Division.

Prepared for Chemical Bank, Chemical Realty Group. Prepared May 1991.

KEC (KEC Engineers, Inc.). 2015. City of Lomita Water Master Plan Update. Prepared September 2015.

MK Environmental Consulting, Inc. 2021. Preliminary Site Conceptual Model. 24702-24777 Crenshaw Boulevard, Torrance, CA. Submitted to Los Angeles Regional Water Quality Control Board. Project No. 20-118. Prepared September 2021.

Parsons. 2004. Principles and Practices of Enhanced Anaerobic Bioremediation of Chlorinated Solvents.

AFCEE, NFEC, ESTCP 457 pp, August 2004
PIC (PIC Environmental Services). 2022. Groundwater Monitoring Report, Concerning commercial property at 2582 South Narbonne Avenue, Lomita, CA. Prepared January 2022.

SCS (SCE Engineers). 1991a. Preliminary Site Investigation. Former Underground Tank Area. Hi-Shear Corporation, Torrance, California. File No. 0191031.00. Prepared June 1991.

SCS (SCE Engineers). 1991b. Report for Soil Verification Borings. Former Underground Waste Oil Tank Area. Hi-Shear Corporation, Torrance, California. File No. 0191031.00. Prepared November 1991.

SCS (SCE Engineers). 1992. Monitoring Well Installation Report. Wells MW-5, MW-6, and MW-7. Hi-Shear Corporation, Torrance, California. File No. 0191031.00. Prepared May 1992.

SWRCB (State Water Resources Control Board). 2022. GeoTracker Data Management System. Available at:
https://geotracker.waterboards.ca.gov/. Accessed 01 March 2022 to 15 April 2022.

February 21, 2023, Reg CC Mtg., Page #259
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian 26 Rev 1: 318160-40240-WW-REP-0001
Terraphase Engineering Inc. 2022a. Groundwater Removal Action Workplan. Skypark Commercial and Lomita Properties. Prepared for City of Torrance. Project No. S042.002.002. January 2022.

Terraphase Engineering Inc. 2022b. Removal Action Workplan for the East Adjacent Properties. Skypark Commercial Properties – East Adjacent Properties. Prepared for City of Torrance. Project No.

S042.002.003. February 2022.

USEPA (United States Environmental Protection Agency). 2000. BIOCHLOR Natural Attenuation Decision Support System. User’s Manual. Version 1.0. EPA/600/R-00/008. January 2000.

USEPA (United States Environmental Protection Agency). 2002. BIOCHLOR Natural Attenuation Decision Support System Addendum. User’s Manual. Version 2.2. March 2002.

USGS (United States Geological Survey). 2002. Geologic, Hydrologic, and Water-Quality Data From Multiple-Well Monitoring Sites in the Central and West Coast Basins, Los Angeles County, California, 1995-2000. Open-File Report 01-277. Prepared in cooperation with the Water Replenishment District of Southern California. Available at https://pubs.usgs.gov/of/2001/ofr01277/ofr01277.pdf USGS (United States Geological Survey). 2003. Geohydrology, Geochemistry, and Ground-Water Simulation-Optimization of the Central and West Coast Basins, Los Angeles County, California. USGS Water-Resources Investigations Report 03-4065. Prepared in cooperation with the Water Replenishment District of Southern California.

Wiedemeier, T., Swanson, M.A., Moutoux, D.E., Gordon, E.K., Wilson, J.T., Wilson, B.H., Kampbell, J.E., Hansen, P., Hass, P., and Chapelle, F. 1996. Technical Protocol for Evaluating Natural Attenuation of Chlorinated Solvents in Groundwater. Air Force Center for Environmental Excellence. November 1996.

Wiedemeier, T.H., Rifai, H.S., Newell, C.J., and Wilson, J.W. 1999. Natural Attenuation of Fuels and Chlorinated Solvents, John Wiley & Sones, New York.

Winefield and Associates, Inc. 2010. Site Conceptual Model. Lisi Aerospace. 2600 Skypark Drive. Torrance, California. Report No. LAP-09-176. Prepared March 2010.

WRD (Water Replenishment District). 2021a. West Coast Basin Watermaster. July 1, 2020 – June 30, 2021.

Prepared by the Administrative Body WRD. Prepared December 2021. Available at https://www.wrd.org/sites/pr/files/WCB%202021%20Watermaster%20Report%20Web.pdf WRD (Water Replenishment District). 2021b. Regional Groundwater Monitoring Report. Water Year 2019- 2020. Central and West Coast Basins. Los Angeles County, California. Prepared March 2021.

Available at https://www.wrd.org/sites/pr/files/2020%20RGWMR%20Final_2.pdf WRD (Water Replenishment District). 2022. Engineering Survey and Report. Prepared March 2022.

Available at https://www.wrd.org/sites/pr/files/WRD%202022%20ESR%20- %20March%20v1%20%28FINAL%29.pdf
February 21, 2023, Reg CC Mtg., Page #260
Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5
Advisian Digital
Rev C: Document number
February 21, 2023, Reg CC Mtg., Page #261
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian Rev 1: 318160-40240-22000-WW-REP-0001
Table A1 BIOCHLOR Model Input Parameters
Data Type Model Parameter Units Value Data Source
Model Domain Source Area Dimensions
Width
Length
Thickness
ft
ft
ft
280
2,000
190
Simulation Time
Steady State Run years 100
Hydrogeology Hydraulic Gradient (i) ft/ft 0.0021 Alta (2017) and GE&R (2021)
Hydraulic Conductivity (K) cm/sec 1.80x10-2 USGA (2003) and Alta (2013)
Effective Porosity (ne) - 0.25 Gibb et al. (1984)
Seepage Velocity (v) ft/year 156.4 Calculated as
v=(Ki)/ne
Dispersion Dispersivity
Plume Length (X)
Longitudinal (αx)
Transverse (αy)
Vertical (αz)
ft
-
-
-
2000
200
60 10
GE&R (2021)
Xu-Eckstein

0.3 x αx

0.05 x αx
Adsorption Retardation Factor (R) - 1.88 Average based on Foc and Koc values
Soil Bulk Density kg/L 1.7 Estimated value
Soil Fraction Organic Carbon (Foc) - 0.001 Default value Organic Carbon Partition Coefficient (KOC)
Tetrachloroethene
Trichloroethene
Cis-1,2 DCE
Vinyl Chloride
L/kg
L/kg
L/kg
L/kg
426
130
125

29.6 Default values in
BIOCHLOR model
applied.

Biotransformation Biodegradation Rates (half-lives)
Tetrachloroethene
Trichloroethene
Cis-1,2 DCE
Vinyl Chloride
yr-1
yr-1
yr-1
yr-1

0.07 0.693

13.86 1.733
Estimated from
Wiedemeier et al.
1999) and adjusted
during calibration.

February 21, 2023, Reg CC Mtg., Page #262
High-Level Evaluation of Potential Impacts from Chlorinated Solvents on Lomita Well #5 Advisian Rev 1: 318160-40240-22000-WW-REP-0001
Data Type Model Parameter Units Value Data Source
Source Data Source Area Concentrations
PCE
TCE
Cis-1,2 DCE
VC
µg/L
µg/L
µg/L
µg/L
220
70,000
20 0
Analytical data
reported in
Hygienetics (1991),
adjusted to calibrate
model.

Field Data Based on Available Monitoring Data
PCE
TCE
Cis-1,2 DCE
VC
µg/L
µg/L
µg/L
µg/L
Varies from
well to well.

Analytical data from
November 2019
reported in GE&R
(2021a).

February 21, 2023, Reg CC Mtg., Page #263
17 ATTACHMENT - D

PROFESSIONAL SERVICES AGREEMENT
(SAMPLE)
February 21, 2023, Reg CC Mtg., Page #264

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN
THE CITY OF LOMITA AND _____________

Page 1 of 13 ends

This AGREEMENT for ______ Project is entered into this day of , 202_, by and between the CITY OF LOMITA, a general law city and municipal corporation (“CITY”) and ____________ (“CONTRACTOR”).

R E C I T A L S
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for __________________.

C. CONTRACTOR warrants to CITY that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONTRACTOR to perform the services as described in Exhibit A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONTRACTOR agree as follows:

1. CONSIDERATION AND COMPENSATION.

A. As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A;
B. As additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONTRACTOR an amount not to exceed $_____ for CONTRACTOR’s services, unless otherwise specified by written amendment to this Agreement.

D. No additional compensation shall be paid for any other expenses incurred, unless first approved by the City Manager or his designee.

E. CONTRACTOR shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous month. CITY shall pay CONTRACTOR all uncontested amounts set forth in the February 21, 2023, Reg CC Mtg., Page #265

Page 2 of 13 ends

CONTRACTOR'S bill within 30 days after it is received.

2. SCOPE OF SERVICES.

A. CONTRACTOR will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONTRACTOR will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement.

3. PAYMENTS. For CITY to pay CONTRACTOR as specified by this Agreement, CONTRACTOR must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONTRACTOR are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONTRACTOR represents that CONTRACTOR has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONTRACTOR’s key person assigned to perform work under this Agreement is . CONTRACTOR shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire on ________, unless earlier termination occurs under Section 13 of this Agreement, or extended in writing in advance by both parties.

8. BEST MANAGEMENT PRACTICES AND TRAINING. The contractor shall implement and maintain activity specific Best Management Practices (BMPs) to prevent pollutant loading from stormwater and non-stormwater discharges to receiving waters as required in Municipal NPDES Permit No. CAS004004. Contracting staff whose primary job duties are related to implementation of BMPs shall be adequately trained to effectively implement, operate, and maintain such BMPs and must be versed in factors affecting BMP effectiveness. The contractor shall certify they have received all February 21, 2023, Reg CC Mtg., Page #266

Page 3 of 13 ends

applicable training to implement the requirements in Municipal NPDES Permit No.

CAS004004 and shall provide documentation to that effect.

9. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONTRACTOR and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

10. TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a Taxpayer Identification Number.

11. PERMITS AND LICENSES. CONTRACTOR will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

12. LAWS AND REGULATIONS; EMPLOYEE/LABOR CERTIFICATION.

CONTRACTOR shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. CONTRACTOR shall be liable for all violations of such laws and regulations in connection with the Services and this Agreement. All violations of such laws and regulations shall be grounds for CITY to terminate the Agreement for cause

13. PREVAILING WAGE.

A. Prevailing Wage. CONTRACTOR is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, CONTRACTOR agrees to fully comply with such Prevailing Wage Laws.

Upon request, CITY shall provide CONTRACTOR with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

CONTRACTOR shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the CONTRACTOR’S principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code within this Agreement, and CONTRACTOR shall therefore comply with such Labor Code sections to the fullest extent required by law.

CONTRACTOR shall defend, indemnify and hold the CITY, its officials, officers, February 21, 2023, Reg CC Mtg., Page #267

Page 4 of 13 ends

employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

B. Registration/DIR Compliance. If the services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, CONTRACTOR and all subcontractors must be registered with the Department of Industrial Relations (“DIR”). CONTRACTOR shall maintain registration for the duration of the project and require the same of any subcontractors. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’S sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the DIR against CONTRACTOR or any subcontractors that affect CONTRACTOR’S performance of services, including any delay, shall be CONTRACTOR’S sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay and shall not be compensable by CITY.

CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.

C. Labor Certification. By its signature hereunder, CONTRACTOR certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

D. Employment of Apprentices. CONTRACTOR and all subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONTRACTOR or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between CONTRACTOR and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid or may have been paid to a debarred subcontractor by CONTRACTOR on the project shall be returned to CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

February 21, 2023, Reg CC Mtg., Page #268

Page 5 of 13 ends

F. CONTRACTOR agrees to bind every subcontractor to the terms of the Agreement as far as such terms are applicable to subcontractor’s portion of the work.

CONTRACTOR shall be as fully responsible to CITY for the acts and omissions of its subcontractor and of persons either directly or indirectly employed by its subcontractor, as CONTRACTOR is for acts and omissions of persons directly employed by CONTRACTOR. Nothing contained in these Agreement shall create any contractual relationship between any subcontractor and CITY.

14. TERMINATION.

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONTRACTOR may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONTRACTOR shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONTRACTOR shall, at CITY’s option, become CITY’s property, and CONTRACTOR will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

15. INDEMNIFICATION.

A. CONTRACTOR shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONTRACTOR’S legal counsel unacceptable, then CONTRACTOR shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation.

CONTRACTOR shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

B. The requirements as to the types and limits of insurance coverage to be maintained by CONTRACTOR as required by Section 19, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or February 21, 2023, Reg CC Mtg., Page #269

Page 6 of 13 ends

qualify the liabilities and obligations otherwise assumed by CONTRACTOR pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

16. ASSIGNABILITY. This Agreement is for CONTRACTOR’s professional services.

CONTRACTOR’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

17. INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. CONTRACTOR will be free to contract for similar service to be performed for other employers while under contract with CITY. CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only.

18. AUDIT OF RECORDS.

A. CONTRACTOR agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement.

CONTRACTOR agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement.

CONTRACTOR further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONTRACTOR will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.

19. CORRECTIVE MEASURES. CONTRACTOR will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONTRACTOR will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONTRACTOR to implement required corrective measures shall result in immediate termination of this Agreement.

20. INSURANCE REQUIREMENTS.

A. CONTRACTOR, at CONTRACTOR’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies:

February 21, 2023, Reg CC Mtg., Page #270

Page 7 of 13 ends

1. Workers Compensation Insurance as required by law. CONTRACTOR shall require all subcontractors similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONTRACTOR for CITY.

2. General Liability Coverage. CONTRACTOR shall maintain commercial general liability insurance in an amount of not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONTRACTOR shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONTRACTOR arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONTRACTOR shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from CONTRACTOR’S operations under this Agreement, whether such operations be by CONTRACTOR or by its employees, subcontractors, or subcontractors. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-per-occurrence basis. When coverage is provided on a “claims made basis,” CONTRACTOR will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated.

Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONTRACTOR for all claims made by CITY arising out of any errors or omissions of CONTRACTOR, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by CITY, and shall be endorsed as follows. CONTRACTOR also agrees to require all contractors, and subcontractors to do likewise.

1. “The CITY, its elected or appointed officers, officials, employees, agents, February 21, 2023, Reg CC Mtg., Page #271

Page 8 of 13 ends

and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the CONTRACTOR, including materials, parts, or equipment furnished in connection with such work or operations.”

2. This policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers.

Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days’ written notice has been received by CITY.

C. CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against Contractor arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY’s option, CONTRACTOR shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

E. CONTRACTOR shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein.

Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

F. Failure on the part of CONTRACTOR to procure or maintain required insurance shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 13 above.

G. The commercial general and automobile liability policies required by this February 21, 2023, Reg CC Mtg., Page #272

Page 9 of 13 ends

Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the CONTRACTOR (as the named insured) should CONTRACTOR fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONTRACTOR understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONTRACTOR as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONTRACTOR’S behalf upon CONTRACTOR’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against Contractor for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

21. USE OF OTHER CONTRACTORS. CONTRACTOR must obtain CITY’s prior written approval to use any Contractors while performing any portion of this Agreement. Such approval must include approval of the proposed Contractor and the terms of compensation.

22. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONTRACTOR of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONTRACTOR for anything done, furnished or relating to the CONTRACTOR’S work or services. Acceptance of payment shall be any negotiation of CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONTRACTOR, its employees, sub-Contractors and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONTRACTOR, its employees, sub-Contractors and agents.

23. CORRECTIONS. In addition to the above indemnification obligations, the CONTRACTOR shall correct, at its expense, all errors in the work which may be disclosed during CITY’S review of CONTRACTOR’S report or plans. Should the CONTRACTOR fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONTRACTOR. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment otherwise owed CONTRACTOR under this Agreement up to the amount of the cost of correction.

24. NON-APPROPRIATION OF FUNDS. Payments to be made to CONTRACTOR by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONTRACTOR’S services February 21, 2023, Reg CC Mtg., Page #273

Page 10 of 13 ends

beyond the current fiscal year, the Agreement shall cover payment for CONTRACTOR’S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

25. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONTRACTOR
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
ATTN: City Manager
ATTN:

Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

26. SOLICITATION. CONTRACTOR maintains and warrants that it has not employed nor retained any company or person, other than CONTRACTOR’s bona fide employee, to solicit or secure this Agreement. Further, CONTRACTOR warrants that it has not paid nor has it agreed to pay any company or person, other than CONTRACTOR’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONTRACTOR breach or violate this warranty, CITY may rescind this Agreement without liability.

27. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONTRACTOR and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONTRACTOR’s or CITY’s obligations under this Agreement.

28. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

29. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

February 21, 2023, Reg CC Mtg., Page #274

Page 11 of 13 ends

30. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

31. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city administrator, or designee, may execute any such amendment on behalf of CITY.

32. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

33. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.

34. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

35. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

36. STATEMENT OF EXPERIENCE. By executing this Agreement, CONTRACTOR represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONTRACTOR represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private Contractors, and experience in dealing with public agencies all suggest that CONTRACTOR is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

37. DISCLOSURE REQUIRED. (CITY and CONTRACTOR initials required at one of the following paragraphs)
February 21, 2023, Reg CC Mtg., Page #275

Page 12 of 13 ends

By their respective initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is a “contractor” for the purposes of the California Political Reform Act because CONTRACTOR’S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONTRACTOR employed by CITY. CONTRACTOR hereby acknowledges his or her assumingoffice, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY’S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to Contractor commencing services hereunder, the City’s Manager shall prepare and deliver to CONTRACTOR a memorandum detailing the extent of CONTRACTOR’S disclosure obligations in accordance with the CITY’S Conflict of Interest Code.

City Initials ______
Contractor Initials ______
OR
By their initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is not a “contractor” for the purpose of the California Political Reform Act because CONTRACTOR’S duties and responsibilities are not within the scope of the definition of contractor in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY’S Conflict of Interest Code.

City Initials ______
Contractor Initials ______
[signatures on following page]
February 21, 2023, Reg CC Mtg., Page #276

Page 13 of 13 ends

IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF LOMITA CONTRACTOR
Ryan Smoot, City Manager By: Steven Martinez
ATTEST:

Kathleen Horn Gregory, City Clerk Taxpayer ID No.

APPROVED AS TO FORM:

Trevor Rusin, City Attorney
February 21, 2023, Reg CC Mtg., Page #277

PROPOSAL
FOR

PROFESSIONAL ENGINEERING SERVICES
FOR

NEW GROUNDWATER WELL

FEASIBILITY STUDY
SUBMITTED TO:

CITY OF LOMITA

PUBLIC WORKS DEPARTMENT
24300 NARBONNE AVE.

LOMITA, CA 90717
JANUARY 17, 2023
February 21, 2023, Reg CC Mtg., Page #278
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for -iNew Groundwater Well Feasibility Study Submitted: January 17, 2023

TABLE OF CONTENTS
PAGE NO.

SECTION 1: COVER LETTER ................................................................................. 1-1 SECTION 2: QUALIFICATIONS................................................................................ 2-1 SECTION 3: SCOPE OF WORK .............................................................................. 3-1 SECTION 4: FEE PROPOSAL (PROVIDED IN A SEPARATE SEALED ENVELOPE) ......... 4-1

APPENDIX A - PROJECT TEAM RESUMES
February 21, 2023, Reg CC Mtg., Page #279
SECTION 1 – COVER LETTER
January 17, 2023
City of Lomita
Public Works Department
24300 Narbonne Ave.

Lomita, CA 90717
Subject: Request for Proposal (RFP)
Professional Engineering Services for New Groundwater Well Feasibility Study
To whom it may concern:

Stetson Engineers Inc. (Stetson) is pleased to submit this Proposal in response to the City of Lomita’s (City) Request for Proposal for Professional New Groundwater Well Feasibility Study. Stetson is prepared to commit the engineering professionals and resources of our firm to provide a feasibility study and report to determine suitable locations for the City’s new groundwater production well in a satisfactory manner within the allocated time schedule and project budget. Stetson would like to emphasize some of the very unique qualifications we bring to this assignment:
• Stetson’s experience providing similar services.
• Stetson’s staff-to-staff professional working relationship with its clients. • Stetson’s professional working relationship with all regulatory agencies and related water agencies.
• A clear understanding of the West Coast Basin hydrogeology Stetson has a proven track record of providing high quality feasibility studies, water infrastructure planning studies and designs, and providing a wide variety of water resource, engineering, and technical support for cities and water agencies throughout Southern California.

Stetson’s proposed Project Manager, Mr. Jeff Helsley, P.E., a former Assistant General Manager and District Engineer for the Water Replenishment District of Southern California, has over forty years of experience with feasibility studies and reports, water resource planning and design, and has lead Stetson’s team through successful completion of numerous water system infrastructure projects that have included design/treatment solutions.

Thank you for considering Stetson for professional engineering services to assist the City of Lomita with preparation of a feasibility study for the City’s new groundwater production well. This proposal will remain valid for ninety (90) calendar days from the submittal date of January 17, 2023. If you have any questions, you may contact me directly at (626) 967-6202 or [email protected] or our proposed Project Manager, Jeff Helsley (who will be the primary contact for this project) at the same number or [email protected]. We look forward to the opportunity of working with the City of Lomita.

Sincerely,
Stephen B. Johnson, P.E.

President/CEO/CFO
Stetson Engineers Inc.

J:\08-Marketing\M1204 - City of Lomita New GW Well Feasiblity Study\Transmittal Letter.doc February 21, 2023, Reg CC Mtg., Page #280
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-1 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
SECTION 2 – QUALIFICATIONS
Integrating Engineering with
Water Resources for Over 60 Years
Stetson Engineers Inc. (Stetson) specializes in
management and development of water
resources. The firm consults to federal, state, and
local agencies; Native American Tribes;
community groups; and private clients throughout
the western United States.

Stetson specializes in all phases of water
resources engineering including groundwater
basin management; well siting; water facility
design and construction management; water
quality evaluations; water distribution system
hydraulic modeling; financial planning and
analysis; grant support services; development of
water system master plans; and project
administration.

BUILDING ON EXCELLENCE
The firm was established by Thomas M. Stetson
in 1957 as Thomas M. Stetson Civil and
Consulting Engineers. In 1977, the Company was
incorporated as Stetson Engineers Inc. Mr.

Stetson’s handpicked successors - Oliver Page,
R.G.; Ali Shahroody, P.E.; and Steve Johnson,
P.E. - have maintained the founder’s focus on
quality services and long-term relationships with
a solid client base. We now staff offices in
Covina, San Rafael and Carlsbad, California;
Centennial, Colorado; and Mesa, Arizona. For
over six decades, Stetson has been providing
creative solutions to water resources issues,
considering, and applying state-of-the-art or
unique methods in addition to traditional
approaches. Stetson has moved to the forefront
of mid-sized consultants specializing in planning,
water resources, and problem solving. Stetson
specializes in all phases of water resources
engineering, including water well design and
development; water system design for complete
distribution systems, pipelines, reservoir storage facilities, pumping stations, and water treatment facilities; financial planning and analysis; water district engineering services; and hydrogeological studies of groundwater basins. Stetson’s services include the preparation of specifications, construction drawings, and contract documents; master plans; feasibility studies; water supply evaluations; urban water management plans; computer modeling of water systems and groundwater basins; and grant and loan applications.

Municipal Engineering
• Water Distribution System Design & Construction Mng
• Water Distribution System Modeling
• Water System Master Plans
• Recycled Water Systems
• Storm Water System Analysis
• Water Treatment Facilities
• Wastewater Systems
Groundwater Resources
• Groundwater Modeling
• Watermaster Services
• Basin Investigations
• Groundwater Development
• Groundwater Management Plans
• Water Wells/Planning, Design, Construction
• Wellhead Protection Plans
• Artificial Recharge Studies
• Water Quality Assessments
• Safe Yield Studies
• Groundwater Cleanup and Aquifer Restoration
• Geophysical Surveys
Water Systems Management
• Economic Feasibility
• Operational Surveys
• Rate Design/Analysis
• System Appraisals and Valuations
Environmental Engineering
• Wetland/Riparian Hydrology
• Impact Analysis/Restoration
• Environmental Assessments and Impact Studies
• Geomorphic Analysis
• Fluvial Geomorphology
Water Rights
• Federal Reserved Water Rights Studies
• Basin and River Adjudications
• Water Right Valuations and Transfers
• Legal and Institutional Support
• Expert Witness Testimony
Surface Water Resources
• River Basin and Watershed Studies
• Natural Flow Determinations
• Reservoir Operations and System Modeling
• Hydropower Investigations
February 21, 2023, Reg CC Mtg., Page #281
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-2 New Groundwater Well Feasibility Study
Submitted: January 17, 2023

RELEVANT PRIOR EXPERIENCE
While Stetson has a wide breadth of experience in water infrastructure and water resources projects, we would like to emphasize the following areas of Stetson’s expertise that pertain specifically to City’s well siting study.

Stetson’s expertise includes water infrastructure projects requiring preparation of well siting studies, design plans and specifications for wells, groundwater treatment facilities, welded steel tanks, pump stations, pressure reducing stations, and pipelines. The following is a partial list of groundwater well siting, design, and construction management projects completed by Stetson:
• City of Arcadia – Goldring Well
• Los Angeles County Public Works – Pitchess Detention Center Well • California American Water Company – Richardson Well, Lemon Well, and Lamanda Well • La Puente Valley County Water District – Design Well No. 5 and 2 Piezometers • San Gabriel Valley Water Company – Design Wells B5E, B25A, B25B, B26A, B26B, and 8 Piezometers
• San Gabriel Water Quality Authority – Design Multiport Monitoring Wells MW5-21, MW5-22, MW5-23, MW5-24
• Valley County Water District – Design Wells SA1-1, SA1-2, and 4 piezometers • Tract 349 Mutual Water Company – Well 2
• Pala Band of Mission Indians – Drilling, Sampling and Installation of Groundwater Production Wells, Monitoring Wells, and Well Design
• Los Angeles County District 36 – Los Valles Well
• City of San Jacinto – Grand Well
Figure 1 Project Organization Chart
February 21, 2023, Reg CC Mtg., Page #282
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-3 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
STETSON’S PROJECT TEAM
Stetson’s Project Team (Figure 1) has extensive experience with hydrogeologic and water quality projects including groundwater basin analysis and management, groundwater quality evaluation, and well siting and design. Stetson’s Team includes very strong managers, groundwater management experts, and hydrogeologists. Stetson’s Project Manager for this project will be Mr.

Jeff Helsley, P.E. Mr. Helsley has worked on several well siting and design projects and has experience conducting groundwater analysis in the West Coast Basin. In addition, Mr. Helsley has direct experience managing groundwater programs, groundwater studies, and well designs. The following are brief bio-sketches of Stetson’s team. The estimated number of hours expected for each of Stetson’s key personnel is included in the Fee Proposal.

STEPHEN JOHNSON, P.E. PRINCIPAL-IN-CHARGE
Mr. Johnson, President and a Principal of Stetson Engineers Inc., is the supervising engineer in charge of the Covina office and has 42 years of experience. Mr. Johnson has been involved in a multitude of studies and projects, maintains close contact with all active clients, and attends meetings regularly for public clients. He has been involved in groundwater management studies, groundwater remediation projects, water quality reports, water system master plans, water system analyses, water rights quantification and analysis, supplemental water requirement studies, alternative water supply studies, annual reports, and project feasibility studies. Mr. Johnson has extensive experience with municipal and water district level issues in southern California, having been working directly as District Engineer for the Main San Gabriel Basin Watermaster and for several watersheds in southern California on such matters as water supply, water quality, management, and financing.

JEFF HELSLEY, PE PROJECT MANAGER
Mr. Helsley has over 40 years of experience in water resource management in southern California.

Mr. Helsley has supervised numerous groundwater treatment, groundwater recharge, water supply, and water rights studies. Mr. Helsley has extensive experience in municipal water supply projects.

Mr. Helsley was formerly the District Engineer and Assistant General Manager of the Water Replenishment District of Southern California, where he was responsible for the development and implementation of programs to enhance groundwater recharge, improve groundwater basin management, and protect groundwater quality in the Central and West Coast Basins. Mr. Helsley was Stetson’s Project Manager for a feasibility study for siting groundwater recharge facilities in the Antelope Valley. Mr. Helsley has been responsible for leading stakeholder based water management plans for the Foothill Municipal Water District, Newhall County Water District, and the Local Agency Formation Commission for Los Angeles County. Mr. Helsley’s experience includes employment with the Los Angeles County Department of Public Works where he was responsible for studies to develop improvements to the County’s injection barriers to prevent seawater intrusion in the West Coast Basin, and studies of groundwater recharge optimization.

JEAN MORAN, PG, CHG TECHNICAL REVIEW
Ms. Moran is a certified hydrogeologist with over 25 years of experience in geology, groundwater hydrology, watershed basin yield analysis, production well field design, and groundwater monitoring program development. She has extensive experience managing hydrogeologic and conjunctive use project studies for groundwater investigations, water rights litigation, and beneficial use assessments. She is a specialist in characterizing southwestern alluvial groundwater basins and development of peer-reviewed regional numerical models for basins with multi-agencies and stakeholders. Ms. Moran is a specialist in assessing the design requirements and feasibility of adaptive management plans in response to variable hydrologic conditions. Ms. Moran’s experience includes field investigations to study the interaction between groundwater and surface water, historical aerial photo analysis using Arc/Info to quantify the impact of riparian evapotranspiration within the regional hydrologic budget, and balanced hydrologic period analysis to provide long-term planning for water agencies. Ms. Moran’s skill as a liaison between regulatory agencies, clients, and other involved parties has been instrumental in achieving project goals.

February 21, 2023, Reg CC Mtg., Page #283
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-4 New Groundwater Well Feasibility Study
Submitted: January 17, 2023

CHAOYING JIAO, PHD, PG, CHG PROJECT HYDROGEOLOGIST
Dr. Jiao recently joined Stetson Engineers. Dr. Jiao’s projects at Stetson include preparation of well rehabilitation specifications, analysis of water availability from fractured rock formations in the San Bernardino Mountains, updating the groundwater model for the Santa Ynez Basin, and developing a method to calculate change in groundwater storage in the Indian Wells Valley Groundwater Basin.

Dr. Jiao is an accomplished, multifaceted hydrogeologist and groundwater modeler with over 31 years of experience. His professional focus is on groundwater resource evaluations, development, and modeling. Mr. Jiao has extensive experience in wellfield exploration, well siting, design and construction management of high-capacity water supply wells and monitoring wells. Recently, he conducted conjunctive water use studies with emphasis on surface water recharge and aquifer storage and recovery. Chaoying has significant experience in aggregating, organizing, managing and interpreting hydrogeologic data, including geologic, borehole geophysical, water quality and aquifer test data. Over years of hydrogeologic study of the Central and West Coast Basin, Dr. Jiao understands the hydrogeologic condition and has established working relationship with the Water Replenishment District of Southern California, the United States Geological Survey and a number of municipal water agencies.

In association with his previous employment, Dr. Jiao had conducted more than twelve (12) well siting, design, and construction management projects, among which three (3) of the most relevant projects are summarized below:

Hydrogeologist, Well Site Feasibility Study, Long Beach Water Department, CA, 2010 Mr. Jiao was responsible for leading the hydrogeologic evaluation, identifying possible well sites, and screening these sites based on their hydrogeologic conditions. Tasks included tabulating and assessing basic construction data and pumping information for existing wells with the objective of evaluating trends in the capacity of existing wells; characterizing the subsurface hydrogeology in the Central Groundwater Basin and analyzing available groundwater data to help identify key aquifer parameters in this study area (i.e., static water levels, groundwater flow directions, transmissivity, and groundwater quality) and locate hydrogeological favorable well sites. He identified and ranked more than ten potential new well sites and developed preliminary cost estimates.

Lead Hydrogeologist, Focused Study of Well Site Locations in the West Coast Basin, Long Beach Water Department, CA, 2014
Dr. Jiao was responsible for leading the hydrogeologic evaluation for siting two new wells in the West Coast Basin with a total production rate of 2,000 to 2,500 GPM based on their hydrogeologic conditions. Part of this hydrogeologic evaluation included data analysis from the recently completed Well Site Feasibility Study and water well and/or test hole data in the West Coast Basin consisting of yield, pumping level, static level and specific capacity, and water quality. Dr. Jiao also analyzed constructability and performed a preliminary engineering cost estimate.

Hydrogeologist, Well 56, City of Anaheim, California.

This project included hydrogeologic research for well siting, design of Well 56, supervision of well construction, and field testing. Well 56 can produce more than 3,500 gpm of water. Dr. Jiao prepared a preliminary design report and drafted a final well design memorandum, a pumping recommendation memorandum, and the final well construction report.

JOHN CARDOZA, P.E. PROJECT ENGINEER
Mr. Cardoza has over 28 years of experience in water resources engineering including project management, well siting studies, design of well head equipment, water treatment plants, pump stations, pipelines, water supply plans, hydrologic studies, basin reconnaissance studies, surface water modeling, statistical analyses, and water quality modeling. Mr. Cardoza has prepared well siting studies and preliminary design reports for new wells. Mr. Cardoza has experience in civil February 21, 2023, Reg CC Mtg., Page #284
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-5 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
design, structural analysis, geotechnical analysis, hydrologic studies, and basin reconnaissance studies for hydroelectric and water works projects. Mr. Cardoza has had extensive experience in water infrastructure design including design of the Los Valles Development Booster Pump Station and Pipeline which entailed the preparation and design of a booster pump station and 3,100 feet of pipeline, construction management for construction of Upper San Gabriel Valley Municipal Water District’s 13,000 feet, 12-inch diameter recycled water pipeline; and City of Compton’s Well 20 Manganese Treatment which entailed the design for a booster pump, piping, 27,000 gallon backwash tank, and site improvements. Mr. Cardoza was the Project Coordinator for planning, design, permitting, construction management, and operations for the entire Baldwin Park Operable Unit (BPOU) groundwater contamination remedy which includes four (4) groundwater treatment projects (including ion exchange), ten (10) wells, booster stations, and 34,000 feet of pipelines. Full treatment plant integration and controls were included, along with full regulatory permitting. Three treatment facilities produce nearly 8,000 gallons per minute (gpm) each, and one plant produces 2,500 gpm. The budget for this work was nearly $150 million. Mr. Cardoza has performed slope stability analyses for embankment dams, structural stability analyses for gravity dams, and stress and stability analyses for arch dams. Mr. Cardoza has performed pre-design studies, prepared design drawings and specifications, prepared construction cost estimates, and conducted field construction inspections on dam structures. Mr. Cardoza has developed hydrologic and operational databases for interfacing with computer simulation models of hydroelectric systems.

SAM LO, PE PROJECT ENGINEER
Sam Lo is a senior engineer with over 19 years of experience with design of water and recycled water facilities (pipelines, wells, pump stations, treatment facilities, etc.), preparation of environmental documentation for water projects, compliance monitoring of industrial waste discharge programs, and with preparing and implementing NPDES services such as preparing permit application, report monitoring and water quality compliance. Mr. Lo has extensive experience in the design of treatment facilities, including San Gabriel Valley Water Company’s Plant B6 Treatment Facility Project; and Valley County Water District’s Arrow Lante Treatment Facility Project.

Mr. Lo has been supporting the expansion of the Upper San Gabriel Valley Municipal Water District’s recycled water system for the past several years. His duties have included construction management support and design of retrofits of customer’s irrigation systems to comply with recycled water regulations.

HEATHER STEELE, PE ENGINEERING SUPPORT
Ms. Steele has experience in water resource engineering including water supply plans, groundwater basin management, environmental compliance, water rights evaluations, water system master plans, hydrologic studies, water quality studies, and grant writing.

Summarized in Table 1 is a list of the percentage of current workload of staff that will be committed to the proposed project.

Table 1 Availability and Responsibility of Project Team Staff Responsibility PERCENTAGE OF TIME AVAILABLE (%)
Stephen Johnson Principal-in-Charge 5
Jeff Helsley Project Manager 15
Jean Moran Technical Review 10
John Cardoza Technical Review 10
Chaoying Jiao Project Hydrogeologist 50
Sammy Lo Project Engineer 30
Noah Wasserman GIS Specialist 20
Heather Steele Engineering Support 10
Provided below is a list of similar projects and clients completed by Stetson.

February 21, 2023, Reg CC Mtg., Page #285
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-6 New Groundwater Well Feasibility Study
Submitted: January 17, 2023

1. City of Arcadia
Attn: Ms. Tiffany Lee, Senior Civil Engineer
11800 Goldring Road
Arcadia, CA 91066
Phone: (626) 254-2713
Email: [email protected]
Well Siting Study Report
In 2020, Stetson conducted a review of available hydrogeologic reports, well logs, and water quality data, conducted with groundwater modeling and hydraulic modeling, and evaluated of potential well sites for siting a new well to be constructed and operated jointly for the City of Arcadia and the City of Sierra Madre. Stetson identified objectives and performance criteria to evaluate, score, and rank potential well sites. Stetson prepared cost estimates for the highest ranked sites and prepared a Well Siting Study Report with recommendations for the preferred well site. Stetson is currently designing a well and site improvements at the recommended well site.

Stetson Project Manager: Steve Johnson
Stetson Team Members: Steve Johnson, John Cardoza, Jean Moran, Sam Lo, Jenny Savron
Project Completion Date: September 2020

2. City of San Jacinto
Attn: Mathew Osborn, Water Utilities Superintendent
595 S San Jacinto Ave
San Jacinto, CA 92583
Phone: (951) 487-7330, ext. 755
Email: [email protected]
New Well Site Study for the City of San Jacinto
In 2019 Stetson provided a well siting study to the City of San Jacinto that evaluated potential sites for a new production well for water supply. A Technical Memorandum presented Stetson’s findings and recommendations.

Stetson Project Manager: Steve Johnson
Stetson Team Members: Steve Johnson, Jean Moran, Tom Ma, John Cardoza, Sam Lo Project Completion Date: March 2018

3. Irwindale Partners/Yellow Iron Investments
Attn: Tony Spinrad
11021 Winner’s Circle, Suite 200
Los Alamitos, CA 90720
Phone: (626) 222-4924
Live Oak Well
In 2020 Stetson prepared plans and specifications for the design and construction of a new 2,000 gpm well for Irwindale Partners’ Park @ Live Oak Development. Upon completion of construction, the new well will be owned and operated by California American Water Company. Stetson’s scope of work included; preparation of a Preliminary Design Report; permitting and regulatory documentation; complete plans and specifications for installation of the new well, pumping equipment, and wellhead piping and disinfection facilities; completion of the well installation report; plans and specifications for the new well; contract documents and submittals; provide monitoring services during well construction; and complete as-built drawings at the conclusion of the project.

February 21, 2023, Reg CC Mtg., Page #286
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-7 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
Stetson Project Manager: Jeff Helsley
Stetson Team Members: Steve Johnson, John Cardoza, Sam Lo Project Completion Date: Well Construction completed June 2021. Well head construction is in progress.

4. California American Water Company
Attn: Mr. Matt Lesecki
8657 Grand Avenue
Rosemead, CA 91770
Phone: (626) 289-7924
Richardson Well
In 2014, Stetson completed the Richardson Well Redrilling Project. Stetson’s scope of work included complete permitting and regulatory documentation; assessment of the location and depth for the new well; complete plans and specifications for installation of the new well, pumping equipment, and wellhead piping and disinfection facilities; completion of the well installation report; plans and specifications for the new well; contract documents and submittals; provide assistance during the bidding process; provide monitoring services during construction; and complete as-built drawings at the conclusion of the project.

Stetson Project Manager: Jeff Helsley
Stetson Team Members: Steve Johnson, John Cardoza, Sam Lo Project Completion Date: November 2014

5. Pitchess Detention Center
(Los Angeles County Department of Public Works)
Attn: Mr. Sal Mendoza
900 S. Fremont Ave.

Alhambra, CA 91803
Phone: (310) 748-9282
Email: [email protected]
Pitchess Water Infrastructure Improvements Project – Well Siting Feasibility Study In 2017, Stetson was contracted by LASD to conduct this well siting feasibility study. The objective of the study was to finalize the siting of the proposed New Well within the Pitchess Detention Center property in Santa Clarita, California, and additional work that may be needed prior to the next phases of work.

Pitchess Water Infrastructure Improvements Project – New Well Preliminary Design In 2018, Stetson prepared a Preliminary Design Report for a new 2,000 gpm production well.

The report included final siting of the well, geotechnical investigation, site survey, and preliminary layout of the well and wellhead facilities. Design criteria for the proposed well and associated pipeline, including hydraulics, electrical, controls, and permitting were detailed in the report.

Stetson Project Manager: Jeff Helsley
Stetson Team Members: Steve Johnson, John Cardoza, Sam Lo, Project Completion Date: Preliminary Design Report completed 2018; Well, Wellhead, and Pipeline design to begin in 2020
Pitchess Water Infrastructure Improvements Project – New Well and Pipeline Design Stetson is currently designing a 2,000 foot deep well, 8,000 feet of pipeline, and well site improvements.

February 21, 2023, Reg CC Mtg., Page #287
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 2-8 New Groundwater Well Feasibility Study
Submitted: January 17, 2023

6. iStar Financial
Attn: Steve Wylder
4350 Von Karman Ave., Suite 225
Newport Beach, CA 92660
Phone: (949) 567-2400
Los Valles Deep Well, Tank, and South Pump Station
In 2012 Stetson completed design and construction
support for water facilities for the Los Valles
Development in Castaic, California. The water
facilities were designed to supply water to 200
homes, an 18-hole golf course, and to provide
backup supplies to the surrounding area. The
facilities included a 3,000 feet of 12-inch diameter
pipeline, a 600,000 gallon and a 300,000 storage
tank, a 2,000 gpm, 2,000-foot deep groundwater
well, a 3,000 gpm booster pump station and
disinfection facility.

In 2016 Stetson began the design of an additional 8,600 foot long 16-inch diameter off-site pipeline and an additional 3,000 gpm booster pump station. Permitting and design review with Los Angeles County is on-going.

Stetson Project Manager: Jeff Helsley
Stetson Team Members: Steve Johnson, John Cardoza
Project Completion Date: On-going
February 21, 2023, Reg CC Mtg., Page #288
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-1 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
SECTION 3: SCOPE OF WORK

SCOPE OF WORK
This Work Plan has been prepared to meet the City of Lomita’s (City) needs as efficiently as possible. This plan is based on the City’s Scope of Work in the Request for Proposal (RFP) and Stetson’s knowledge of the West Coast Basin and expertise in well siting, design, and construction management. Although the Work Plan is brief due to page limitations, all the tasks in the RFP are included in this proposal.

A timeline schedule (Table 4) depicting the sequence and duration of tasks and the Estimated ManHours Matrix (Table 5) required to complete the Work Plan are included. The associated fee proposal for this work plan is being provided in a separate, sealed envelope. Also listed in this Work Plan are optional tasks which may be considered by the City.

The City intends to conduct a feasibility study for a new groundwater production well. Currently, the City has groundwater rights of 1,352-acre feet (ac-ft) in the West Coast Basin. Due to the detection of benzene, the City’s only groundwater source well, Well No. 5, has remained offline since May 2019. Well No. 5 is anticipated to resume operation in early 2023. In calendar year 2018, Well No. 5 produced 561 acre-feet of groundwater. To form a basis of a long-term reliable water supply, the City is considering developing a new municipal water supply well in City limits or neighboring cities in the West Coast Basin.

The specific capacity (gpm/ft) of a well is the pumping rate (gpm) (Q) divided by the drawdown in feet(s). Specific capacity mapping for the area around the City digitized from the Water Replenish District’s (WRD) Technical Bulletin, Volume 2, 2005, Well No. 5, and one WRD nested monitoring well, Lomita #1, are shown in Figure 2. The specific capacity is a measure of the effectiveness of a well. Figure 2 shows that most of the area within the City has a specific capacity value from 100 to 200 gpm/ft. Attachment C of the RFP reported that the shallow groundwater flows east-southeast, and chlorinated solvents are primarily migrating laterally versus vertically.

We understand that in addition to high concentrations of iron and manganese, the City’s existing water supply well #5 is potentially impaired by chlorinated volatile organic compounds (cVOCs). It is of concern that a new well site is likely to be affected by Trichloroethene (TCE) and Tetrachloroethene (PCE) as well. Therefore, key water quality constituents which could affect treatment requirements are manganese, iron, TCE and tetrachloroethylene (PCE).

The purpose of the proposed study is to:
• Collect and review well yield, pumping level, static level, specific capacity, environmental and existing infrastructure data from the US geological Survey (USGS), WRD, State Water Board, and California Department of Water Resources.
• Characterize the subsurface geology both within the City limits and in neighboring cities in the West Coast Basin
• Analyze available groundwater data to help identify key aquifer parameters in this study area (i.e., static water levels, groundwater flow directions, transmissivity, and groundwater quality)
• Determine the hydrogeologic feasibility of developing one new groundwater supply well • Identify potential locations and evaluate land availability, permit requirement and connections to the existing collection system in a priority ranking order for the well locations February 21, 2023, Reg CC Mtg., Page #289
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-2 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
Figure 2 Specific Capacity Map (Digitized from WRD’s Technical Bulletin, Volume 2, 2005) February 21, 2023, Reg CC Mtg., Page #290
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-3 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
For the purpose of siting the new well in the West Coast Basin, we recognize that the team selected for the project should have a firm grasp of the key hydrogeologic issues for development of groundwater resources and also of the methods for resolving logistical or hydrogeologic issues related to well siting. Stetson has assembled a team because of their individual skills and experience, as well as their proven track record in working together on similar projects. This Stetson team can begin working promptly on the New Groundwater Well Feasibility Study.

A list of potential project issues that will impact the well site selection and eventual cost of construction of the new wells is shown on Table 2. This table also contains our team’s approach and similar projects where we have dealt with the issue.

Table 2 Project Issues, Stetson’s Approach and Successes

PROJECT
ISSUES

STETSON TEAM'S APPROACH TO
ISSUE

STETSON TEAM PROJECT WHERE THIS

APPROACH WAS SUCCESSFUL
Thickness and
continuity of
aquifers
Correlate electric logs and lithologic logs
throughout the West Coast Basin.
• Well Site Feasibility Study
• Focused Study of Well Site Locations in the
West Coast Basin
• Well Siting Study Report for the City of Arcadia
Aquifer
transmissivity
and storativity
Tabulate and assess basic construction
data and pumping information; analyze
available groundwater data to help
identify key aquifer parameters in this
study area.
• Well Site Feasibility Study
• Focused Study of Well Site Locations in the
West Coast Basin
• Well Siting Study Report for the City of Arcadia
• Richardson Well
Water quality:
contaminant
and corrosion
Tabulate and assess available
groundwater data to help identify
distribution of potential contaminants and
casing corrosion constituents.
• Well Siting Study Report for the City of Arcadia
• Well Site Feasibility Study
• Focused Study of Well Site Locations in the
West Coast Basin
Effect on
adjacent wells
Employ analytical model to evaluate
potential drawdown interferences.
• Well Site Feasibility Study
• Focused Study of Well Site Locations in the
West Coast Basin
• City of Anaheim Well 56
Availability of
Sites
Apply systematic site alternative
screening process to identify sites that
have adequate space to drill and
construct the wells.
• Well Siting Study Report for the City of Arcadia
• New Well Site Study for the City of San Jacinto
Connection to
Existing
Collection
System
Determine priority of hydrogeologic
condition, availability of land and cost for
connection to existing water supply
system. Discuss within the team.
• Los Valles Deep Well, Tank, and South Pump
Station
• Water Rights Support and As-Needed
Engineering
Cost Estimate
Employ certified cost estimate and
discuss within the team to determine
costs for design, construction, and O &M.
• Well Site Feasibility Study
• Focused Study of Well Site Locations in the
West Coast Basin
• Well Siting Study Report for City of Arcadia
Permitting
Site reconnaissance to determine if
NPDES discharge requirements can be
readily met and noise mitigation
measures are needed
• Pitchess Water Infrastructure Improvements
Project-New Well Preliminary Design
• Lemon Well
• Richardson Well
Our knowledge of these key issues has been developed through our current and previous work efforts, the most important of which is the ongoing correlation of electric log signatures throughout the Central and West Coast Basins. This effort is the key to understanding the location, thickness, and continuity of the aquifers underlying the local groundwater basins. We understand that the aquifers underneath the Central Basin and West Coast Basins are the Recent Aquifer system, the Lakewood aquifer system, Upper and Lower San Pedro aquifer systems and the Pico Unit, among which the Lynwood and Silverado aquifers in the Upper San Pedro aquifer system are the most productive.

February 21, 2023, Reg CC Mtg., Page #291
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-4 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
Table 3 Work Breakdown Structure
Task Description
1 GENERAL PROJECT ADMINISTRATION & MEETING

1.1 Project Management

1.2 Attend Routine Progress Meeting
2 DATA RESEARCH & INVESTIGATION

2.1 Data Collection and Review

2.2 Review West Coast Basin Hydrogeology

2.3 Analysis of Potential Sites in the West Coast Basin

2.4 Field Reconnaissance
3 PRELIMINARY WELL FEASIBILITY REPORT
4 FINAL WELL FEASIBILITY REPORT
5 OPTIONAL WORK
Stetson’s approach to the New Groundwater Well Feasibility Study is to conduct a series of team meeting with City staff to identify possible well sites and to successively screen these sites against a set of project requirements, arriving at a list of three feasible well sites. It is understood that all of the items listed in the RFP will be completed by Stetson. We have organized the tasks listed in the RFP to produce a work breakdown structure (WBS) which serves as the basis for the schedule and cost estimate. This WBS is summarized in Table 3. Selected tasks are described in more detail in this section.

Table 4 Project Schedule
7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Task
No. Feb 13 - Feb 17 Feb 20 - Feb 24 Feb 27 - Mar 3 Mar 6 - Mar 10 Mar 13 - Mar 17 Mar 20 - Mar 24 Mar 27 - Mar 31 Apr 3 - Apr 7 Apr 10 - Apr 14Apr 17 - Apr 21Apr 24 - Apr 28May 1 - May 5May 8 - May 12May 15 - May 19May 22 - Jan 26May 29 - Jun 2 Jun 5 - Jun 9 Jun 12 - Jun 16 Jun 19 - Jun 23

1.1 Project Management

1.2 Attend Routine Progress Meeting

2.1 Data Collection and Review

2.2 Review West Coast Basin Hydrogeology

2.3 Analysis of Potential Sites in the West Coast Basin

2.4 Field Reconnaissance
3 4
Activity Description
General Project Administration & Meeting
Apr. 2023 May. 2023 Jun. 2023
Preliminary Well Feasibility Report
Data Research and Investigation
Feb. 2023 Mar. 2023
Week
Month
1 2
Final Well Feasibility Report
The project schedule is summarized in Table 4, assuming the Kick-off meeting to be held on February 15, 2023, and the estimated time to complete the project is four (4) months. Including the Kick-off meeting, four meetings are scheduled. Estimated man-hours are summarized in Table 5, where resources needed for completing each task are defined.

February 21, 2023, Reg CC Mtg., Page #292
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-5 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
TASK 1 GENERAL PROJECT ADMINISTRATION & MEETING
Stetson will establish internal project controls to monitor project status, budget and schedule on an ongoing basis. Stetson will prepare monthly status reports, hold monthly coordination meetings with the City, and prepare monthly invoices for the City. Stetson’s Project Manager, Mr. Jeff Helsley, will be responsible for managing the budget and schedule. Mr. Helsley will also be the City’s main point of contact to maintain frequent interaction during the project on an as-needed basis. He will play a key role in streamlining information and provide a New Groundwater Well Feasibility Study that is based on a consistent study approach. Mr. Helsley will be supported by a core team of Dr.

Chaoying Jiao and Sammy Lo.

Table 5 Estimated Man-Hours Matrix
Task Description
PrincipalSteve JohnsonProject ManagerJeff HelsleySupervisorChaoying JiaoSr EngineerSammy LoAssoc. EngineerHeather SteeleClerical 1 GENERAL PROJECT ADMINISTRATION & MEETING 2 12 16 2

1.1 Project Management 2 10 8 2

1.2 Attend Routine Progress Meeting 2 8
2 DATA RESEARCH & INVESTIGATION 2 4 80 18 34 6

2.1 Data Collection and Review 10 4 16 6

2.2 Review West Coast Basin Hydrogeology 30 8 8

2.3 Analysis of Potential Sites in the West Coast Basin 2 4 34 6 10

2.4 Field Reconnaissance 6
3 PRELIMINARY WELL FEASIBILITY REPORT 4 4 30 4 20 10
4 FINAL WELL FEASIBILITY REPORT 2 6 2 10 2
5 OPTIONAL WORK 4 26
Stetson will perform internal quality assurance and quality control (QA/QC) activities to obtain expert guidance on project methodology and criteria, review project deliverables and perform checks of engineering calculations and cost estimates. QA/QC staff will consist of senior level engineers (Jean Moran and John Cardoza, Supervisor I) experienced in well site selection, well design and construction management who are not otherwise involved in the day-to-day project activities.

Stetson intends to provide an accurate and high-quality product to the City. All work products developed by Stetson are directed by experienced staff. Data, calculations, drawings, and correspondence are reviewed by peers or supervisors prior to submittal to the City. Copies of all submittals are retained by Stetson as well as all comments and correspondence received from others.

Frequent communication among all project participants is essential to the success of any project.

Stetson has a proven, systematic approach to maintaining accessible project documents and February 21, 2023, Reg CC Mtg., Page #293
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-6 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
written and verbal communication throughout the project. Stetson will prepare meeting agendas and meeting minutes for City review. A total of 32 man-hours is estimated to complete Task 1.

TASK 2 DATA RESEARCH AND INVESTIGATION
Stetson has an in-depth working knowledge and comprehensive data on the hydrogeology of the West Coast Basin. One of Stetson’s proposed team members, Dr. Chaoying Jiao conducted two similar well site feasibility studies for other clients in the Central and West Coast Basins from 2010 to 2014. Stetson’s project manager Mr. Helsley was formerly the District Engineer and Assistant General Manager of WRD, where he was responsible for the development and implementation of programs to enhance groundwater recharge, improve groundwater basin management, and project groundwater quality. Mr. Helsley’s experience includes employment with the Los Angeles County Department of Public Works where he was responsible for studies to develop improvements to the County’s injection barriers to prevent seawater intrusion in the West Coast Basin, and studies of groundwater recharge optimization.

2.1 Data Collection and Review
Immediately following the Kick-off meeting, Stetson will collect and compile water well and/or test hole data, which consist of previous drilling locations and respective water well/test hole numbers; driller’s logs; casing records; borehole geophysical logs; water level monitoring data; efficiency test records; and water quality laboratory test results.

In preparation for this project, Stetson has already acquired the following information:
• Water level, production record, water quality and well construction of nearby production wells and monitoring wells from WRD’s website included in the RFP • Results of regional geologic field mapping of the area published by the California Department of Water Resources (DWR) and the United States Geological Survey (USGS) • Driller’s logs in the West Coast Basin, as available in our database; • Lithologic logs and electric logs for nearby wells owned by neighboring water companies and cities; and
• Data on pumping rates, water levels, and water quality for the wells in adjoining water districts and cities.

In addition to the data sources cited above, other potential sources of data may include the California Statewide Groundwater Elevation Monitoring (CASGEM), California State Water Resources Control Board (California Waterboards) Geotracker, Department of Toxic Substances Control (DTSC) Envirostor database, Division of Drinking Water (DDW), and State of California Department of Public Works’ Bulletin 45.

Stetson will review all available data and summarize findings in graphs and charts. In addition, information of land availability, existing water collection system and infrastructure will be gathered and compiled into GIS files.

Stetson anticipates completing this task within 9 weeks (Table 3) and the total man-hours needed is 36 (Table 4).

2.2 Review West Coast Basin Hydrogeology
A team meeting will be scheduled to perform site identification and review of hydrogeologic conditions and logistic constraints. In the siting and eventual construction of the new well, selection will depend on the: (1) hydrogeologic favorability of the site and (2) logistical favorability of the site.

February 21, 2023, Reg CC Mtg., Page #294
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-7 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
In evaluating the hydrogeologic favorability, Stetson will use a four-tiered approach to identify areas of favorable hydrogeology for defining potential well sites:

1. Define the thickness and continuity of aquifer systems beneath the site.

2. Estimate the aquifer’s physical hydrogeologic properties, e.g., transmissivity and storability, from well logs and other data.

3. Assess the groundwater quality and respective treatment requirements for the site.

4. Determine groundwater flow directions, potential well interference, and production rates.

A total of 7 weeks is scheduled to complete this task (Table 3) and the total man-hours needed is 46 (Table 4).

2.3 Analysis of Potential Sites in the West Coast Basin After areas of favorable hydrogeology have been identified, at least three (3) sites lending to favorable logistics during construction will be considered. In this step, a few considerations are defined and evaluated:
• Land availability for potential well sites
• Size of the site and available area for treatment facilities, if needed • Temporary water supply availability for drilling of the pilot and final boreholes • Location of storm drains near the site for disposal of well development and testing water • Distance to potential connection to the collection and distribution systems • Cost of design, construction, and operation and maintenance of the proposed well sites; and • Set-back requirements per California Well Standards 74-81 and 74-90.

Stetson will conduct a thorough investigation of the required environmental assessment and permitting necessary for the success of the construction of a new well. Unattended, these requirements can present major challenges to the ultimate success of City’s project. Environmental concerns will be addressed and outlined in preparation for construction, for example, aesthetics and noise during construction.

Table 5 Preliminary List of Required Permits

1. Permit 2. Agency
NPDES Permit for Well discharge Regional Water Quality Control Board Temporary Discharge to Surface
Features LA County Department of Public Works
Well Construction Permit LA County Department of Public Health, Environmental Health Division
Drinking Water Source Assessment SWRCB – Division of Drinking Water_ A preliminary listing of required approvals and permits is listed in Table 5. If needed, treatment facilities may trigger additional permitting requirements. In addition, easement permits may be required. These permitting needs will be identified in this task, but it is assumed actual permitting will be completed in a future phase of the work.

Stetson anticipates completing this task within 9 weeks (Table 3) and the total man-hours needed is 56 (Table 4).

2.4 Field Reconnaissance
When the most favorable sites have been chosen from a hydrogeologic perspective, the Stetson team will coordinate with City staff to conduct a one-day field reconnaissance to investigate the size February 21, 2023, Reg CC Mtg., Page #295
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-8 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
of the sites, environment, location of fire hydrants and storm drains, location, and distance of existing water collection system to the proposed well sites. Stetson will assess the results immediately after the field investigation.

TASK 3 PRELIMINARY WELL FEASIBILITY REPORT
Preliminary Well Feasibility report will summarize the analysis and recommendations developed in Task 2 and will incorporate comments from City. The draft report will be submitted electronically to the City for review.

The Preliminary Well Feasibility Report will follow the outline listed below:
i. Introduction
ii. Well Site Identification and Feasibility Analysis
a. Well Site Identification
b. Hydrogeologic Review
c. Site Constraint Analysis
d. Rank the Sites
e. Field Reconnaissance
f. Validation
iii. Constructability
a. Permitting Requirement and Regulations
b. Cost Estimate for Design and Construction
c. Cost Estimate for Operation and Maintenance
d. Estimated Life Cycle
e. Construction Constraints at Each Site
f. Operation and Maintenance Considerations at Each Site g. Well Testing
h. Treatment Technology
i. Preliminary Schedule
iv. Conclusions and Recommendations
Figures anticipated for the well site feasibility study are • Well location map showing proposed and existing well locations in the area of interest in the West Coast Basin
• Geologic cross sections of the area of interest
• Contours of current water levels
Tables summarizing the well construction, water level fluctuations, specific capacity and pumping rates and water quality will also be provided.

Stetson anticipates completing this task within 7 weeks (Table 3) and submitting the Preliminary Well Feasibility Report on June 2, 2023. The total estimated man-hours for completing this task are 72 (Table 4).

TASK 4 FINAL WELL FEASIBILITY REPORT
Following authorization from City staff, Stetson will incorporate City staff’s consolidated comments from their review of the Preliminary Well Feasibility Report. Stetson will submit one (1) digital pdf copy, one (1) digital native file copy of the Final Well Feasibility Report, and two (2) bound hard copies to the City.

February 21, 2023, Reg CC Mtg., Page #296
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 3-9 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
OPTIONAL WORK – FUNDING RESEARCH
During the course of the work, the City may authorize services researching grant/funding opportunities and preparing documentation for applications for the completion of the design and construction phases of the project.

Stetson understands that work under this task may include, but not be limited to, researching State and Federal funding opportunities that the City and project qualify for, maintaining communication with funding parties as needed, and the completion of funding applications as needed. 30 labor hours of work is assumed to complete this Task.

February 21, 2023, Reg CC Mtg., Page #297
CITY OF LOMITA STETSON ENGINEERS INC.

Proposal to Provide Professional Engineering Services for 4-1 New Groundwater Well Feasibility Study
Submitted: January 17, 2023
SECTION 4 – FEE PROPOSAL
Per the City’s RFP, Stetson’s Fee Proposal is provided in a separate sealed envelope.

February 21, 2023, Reg CC Mtg., Page #298

APPENDIX A

RESUMES
February 21, 2023, Reg CC Mtg., Page #299
Stetson Engineers Inc. Page 1 of 6
Steve Johnson-Box21

RESUMES
Name & Title:

Steve Johnson, P.E., Corporate President/CEO and
Managing Principal
Project Assignment:

Principal Engineer
Years of Experience with Firm
44 Years of Experience With Other Firms
0 Education: Degree(s) / Year / Specialization:

B.S. Civil Engineering / 1977 / California Polytechnic
University, Pomona
Registrations / Certifications:

Civil Engineer No. 32396, California 1981
Experience Record
Mr. Johnson is Corporate President/CEO and Managing Principal of the Covina office of Stetson Engineers. Mr.

Johnson is responsible for all engineering operations performed by the firm’s southern California office, in Covina, California. Mr. Johnson’s extremely broad experience covers the southern California work for well over a quarter century. As a Managing Principal, Mr. Johnson is responsible for all corporate management functions and professional engineering support services. Mr. Johnson has represented Stetson for over 40 years, continuous.

Mr. Johnson is a designated expert for purposes of water system and water rights evaluation and appraisal. This includes qualification in U.S. Federal Court as an expert under the Daubert rules of qualification. He has provided expert witness testimony on water system/water rights condemnation actions, groundwater contamination cases, and flood damage evaluations and assessments. Mr. Johnson’s expertise has supported numerous water systems and water rights transactions and settlements. He has also provided expert witness testimony of the impacts and decision-making associated with water supply contamination, before the California Public Utilities Commission, Administration Law Judge.

Mr. Johnson is the designated “Project Engineer” for implementing cleanup of the largest groundwater contamination site in the nation, under the U.S. Environmental Protection Agency’s Superfund Program. Under this assignment, Mr. Johnson coordinates with the U.S. EPA, six different water purveyors, the Main San Gabriel Basin Watermaster, the San Gabriel Basin Water Quality Authority, and numerous Responsible Parties and their engineering/legal representatives. This assignment has a current value of $250 to $300 million and will produce over 35,000 acre-feet of treated, potable groundwater annually. Mr. Johnson’s responsibilities include all phases of project planning, financing, coordination, regulatory compliance, design, contract solicitation, construction management, operations, and performance monitoring for contamination plume control and cleanup.

As a predecessor to this assignment, Mr. Johnson supervised the planning, design, construction, operations, and regulatory approval of the first groundwater treatment facility in the United States to successfully treat for Perchlorate and NDMA for potable consumption. This facility was also the first groundwater treatment facility to be permitted for drinking water supply under the California Department of Health Services Policy 97-005 for impaired water supplies.

Mr. Johnson represents several prominent water agencies as “Engineer”. These agencies include the Main San Gabriel Basin Watermaster, the Upper San Gabriel Valley Municipal Water District, the San Gabriel Valley Municipal Water District, and the San Gabriel Basin Water Quality Authority. Typical assignments include safe yield studies, groundwater contamination characterization and remediation, design, construction management, rate assessment, water supply studies, and reports to the board.

Since the early 1980s, Mr. Johnson has been heavily involved with engineering solutions to contamination of drinking water supplies. This work involves a wide range of experience and expertise, including site and regional characterization of soil and groundwater contamination, hydrogeologic studies, groundwater basin modeling, development of cleanup and water supply plans, remediation studies, development and full implementation of treatment projects, and coordination with all regulatory agencies. The contaminants of concern include volatile organic compounds (VOCs), Perchlorate, NDMA, 1-4-dioxane, Chromium and others. This work has been performed in full cooperation with the U.S. Environmental Protection Agency, the State Department of Toxic Substance Control, the Department of Health Services, the State Water Resources Control Board, and the Regional Water Quality Control Board.

February 21, 2023, Reg CC Mtg., Page #300
Stetson Engineers Inc. Page 2 of 6
Steve Johnson-Box21

RESUMES
Steve Johnson, Principal Engineer
(Continued)
The following projects are representative of Mr. Johnson's experience:

City of Los Angeles, Department of Water and Power. Supplemental Water Study.

City of Los Angeles, Department of Water and Power. Hoover Dam Power Contracts.

Upper San Gabriel Valley Municipal Water District
• Supervision of District Engineering Duties
• Area Wide Water Quality Monitoring Plan
• AB 1803 Water Quality Monitoring Plan
• AB 797 Water Conservation Plan
• Feasibility Studies - Use of Reclaimed Water
• Supervision of EPA Superfund Sub-Contract
• Drought Studies
• Puente Hills Landfill Investigation
• District Mapping
• Reclaimed Water Study
• Direct Use Project
• Indirect Reuse Replenishment Project
San Gabriel River Watermaster. Named one of the three Watermasters in 2011 City of Bakersfield
• Design of Turnout Structure - Kern River
• Design of Turnout Structure - Canal
• Water System Master Plan
• Review of New Development Plans
• Design of Box Culvert
• Acquisition of New Facilities
• Water System Operations Study
Santa Ynez River Water Conservation District
• Design of Reservoir Renovation
• Design of Lake Cachuma Intake Facility
• Design of Well Fields (6.0 cfs, 4.0 cfs and 1.73 cfs) • Design of Booster Station
• Administration of State Loan and Grant
• Supervision of Cathodic Protection
• Design of Well No. 15 Pumping Equipment
• Lake Cachuma Intake Maintenance
February 21, 2023, Reg CC Mtg., Page #301
Stetson Engineers Inc. Page 3 of 6
Steve Johnson-Box21

RESUMES
Steve Johnson, Principal Engineer
(Continued)
• Zone III Reservoir Design
• Cachuma Pipeline Rehabilitation
• SWP Facilities Design
East Pasadena Water Company Design of Water Main Extensions for Fire Service.

Kaiser Steel Valuation of Water Related Holdings at Fontana Plant.

City of Solvang
• Design of Wells No. 7 and 8 Water Supply
San Gabriel Valley Municipal Water District
• Feasibility Study Hydroelectric Generation Stations
• Continuing Developer Interaction Responsibilities
• Supervision of Periodic Pipeline As-Built Updates
• Feasibility Study and Acquisition for Turnout Structure • Transmission Pipeline Rehabilitation Project
• State Water Project Entitlement Report
• Urban Water Management Plans
• Pipeline Extension Project
City of Industry Master Plan of Development
Main San Gabriel Basin Watermaster
• Supervision of Engineering Duties
• Basin Water Quality Studies
• Basin Modeling
• Enforcement of Pumping Control
• Operable Unit Cleanup Plans
• BPOU Cleanup Project
• Full Compliance Permitting
Puente Basin Watermaster Supervision of Engineering Duties Buellton Community Services District
• Water System Design
• Sewer System Design
City of Torrance Feasibility Study on Hydroelectric Generation Mr. Riley Metz Site Drainage Study and Improvement
Mr. Redmond Flood Damage Study
Boy Scouts of America Flood Damage Study
Rapid Transit District Waste Discharge Study
February 21, 2023, Reg CC Mtg., Page #302
Stetson Engineers Inc. Page 4 of 6
Steve Johnson-Box21

RESUMES
Steve Johnson, Principal Engineer
(Continued)
Mr. Lapin Flood Damage Study
U.S. Department of Navy, Camp Pendleton
• Water System Study
• Water System Design
City of Claremont Representative on Proposed Quarry Development Cabazon Water Company Valuation Study
HLM Water System Valuation Study
Citizens Utilities Company Valuation of Jackson Water Works County of San Bernardino Safe Yield Study
Walsh v. State of California Flood Damage Study
Three Valleys Municipal Water District Subagency Report Morongo Band of Mission Indians Ongoing Engineering Studies La Quinta Water System Valuation Study
City of Ontario Flood Damage Study
Serrano Park Homeowners Association Flood Plain Improvements California Department of Fish and Game Valuation of Water Rights at Indian Joe Spring Sunnymead Ranch Lake Reconstruction
City of Livermore and California Water Service Trade of Service Areas – Arbitration Sparkletts Water Water Supply Study
Cancun Racquet Club Subsidence Evaluation
East Highlands Ranch Water Rights and Consultation Work Covina Irrigating Company Valuation
Hartman Farms (Ohio) Coordination of basin recharge with rock and sand operations Turner Ranches Valuation of Sanitary System
City of Barstow
• Water Rights
• Mohave River Water Quality Evaluations
• Contaminant Investigations
City of Glendora Conjunctive Use Study
Lewis Homes Management Corp Water Resources and Supply Studies City of Oceanside Water Resources Study
City of Upland Water Rights Evaluation
February 21, 2023, Reg CC Mtg., Page #303
Stetson Engineers Inc. Page 5 of 6
Steve Johnson-Box21

RESUMES
Steve Johnson, Principal Engineer
(Continued)
San Gabriel Basin Water Quality Authority
• Consulting Services
• Arrow Well Project
• Big Dalton Project
• Monrovia Project
City of Bullhead City, Wastewater Treatment Plant Evaluation Azusa Valley Water Company Valuation
American Water Works. Well Design
City of Covina. Valuation of Covina Irrigating Company
Suburban Water Systems. Valuation of Facilities
City of Whittier Urban Water Plans
Lewis Homes, Monrovia Nursery Water Resources
Beverly Acres Mutual Water User's Association Valuation Southern California Water Company, Staff Projects
City of Oceanside - Water Resources Study
Prado Dam Flood Damage - Perrizo
Chino Basin Watermaster - Engineering
Santa Margarita Water District - Appraisal
San Gabriel Valley Water Co. v. Sanitation Districts
Tri-Cities/Camp Pendleton - Economic Evaluation of Conjunctive Use Water Supply Project Three Valleys Water District - General Engineering
San Gabriel River Water Committee - General Engineering City of Beverly Hills - Water Distribution System Analysis Valley County Water District - Urban Water Management Plan Valley County Water District - General Engineering
Montebello Land and Water Company
City of Oceanside - Water Rights and System Modeling
City of Oxnard - Water Quality
Raymond Basin - Perchlorate Study
Star Kist Foods - Water Rights Evaluation
Orange County Water District - Prado Basin Constructed Wetlands East Highlands Ranch - Water Supply
Elsinore Water District Well Interference
City of Perris
February 21, 2023, Reg CC Mtg., Page #304
Stetson Engineers Inc. Page 6 of 6
Steve Johnson-Box21

RESUMES
Steve Johnson, Principal Engineer
(Continued)
LPVCWD Perchlorate/NDMA Facility
Tejon Ranch Water/Sanitation
City of San Diego Studies
DHS Permitting - Policy 97-005
SEMOU Cleanup Plans
SCWC SEMOU Water
San Jacinto-Hemet Groundwater Management Plan
Baldwin Park Operable Unit – Groundwater Cleanup Project San Gabriel Valley Water Company (SGVWC) – General Rate Case Filing Before the Public Utilities Commission for SGVWC’s Fontana Water Company Division
People vs. Rosemead
CalTrans vs. San Antonio Lakes Partners, et al.

State of New Mexico, et al. vs. General Electric company American States Water Company et al. vs. State of California et al., & Aerojet-General Corporation, et al.

Suburban Water Systems Rate Case before the Public Utilities Commission Paulus Engineering, Inc. vs. Ridge Development, LLC
Summit Water Holdings, LLC/Harper Lake Basin
Villages of Avalon Community Association vs. Perris Public Utility Authority People of the State of California and the City of San Diego vs. Kinder Morgan Energy Partners Tahoe City Public Utility Districts vs. Tahoe Park Water Company; Lake Forest Water Company February 21, 2023, Reg CC Mtg., Page #305
Stetson Engineers Inc. Page 1 of 3
Jeff Helsley Box 21
RESUME
Name & Title:

Jeff Helsley, P.E., Supervising Engineer
Project Assignment:

Project Manager
Years of Experience with Firm
22 Years of Experience With Other Firms
17 Education: Degree(s) / Year / Specialization:

M.S. Environmental Engineering / 1982 / University of
Southern California, Los Angeles (USC)
B.S. Civil Engineering / 1981 / California State University, Los Angeles (CSULA)
Registrations / Certifications:

Civil Engineer No. 039599, California, 1985
Experience Record
Mr. Helsley joined Stetson Engineers, Inc. in 1999 as project manager for water rights quantification and valuation studies, alternative water supply studies, water resource management studies, water facilities design including site improvements for drainage and access, and groundwater recharge feasibility studies including sand and gravel pits in the San Gabriel Valley.

His experience includes employment with the Los Angeles County Department of Public Works in the Hydraulic/Water Conservation Division. As a Supervising Civil Engineer I in the Planning Unit, he was responsible for studies to develop improvements to the County’s injection barriers to prevent seawater intrusion, and studies of groundwater recharge optimization.

Mr. Helsley was also formerly the District Engineer and Assistant General Manager of the Water Replenishment District of Southern California, where he was responsible for the development and implementation of programs to enhance groundwater recharge, improve groundwater basin management, and protect groundwater quality.

Chino Pipeline and Facilities Improvements Project
• Well-site review, permitting and design including a drainage study and retention basin design • Well construction oversight
• Pump testing and station design
• Nitrate Removal Treatment Plant Design
• Design for three separate pipelines
• Assistance in pipeline permitting
• Preparation of specifications and bid documents
San Luis Rey Indian Water Rights Dispute, San Diego County Antelope Valley Groundwater Recharge and Recovery Study San Gabriel Valley Municipal Water District 30” Pipeline Realignment City of Pomona Water Pipeline Replacement Design
Water Supply Assessments
• The Shops at Santa Anita, Arcadia, California
• Copa de Oro Development, Rosemond, California
• Newhall County Water District, Santa Clarita Valley, California • Uptown Specific Plan, Whittier, California
• Monrovia Nursery, Azusa/Glendora, California
• West Main Street Master Plan, Alhambra, California
• Valley Vision Specific Plan, San Gabriel, California
February 21, 2023, Reg CC Mtg., Page #306
Stetson Engineers Inc. Page 2 of 3
Jeff Helsley Box 21
RESUME
Jeff Helsley, Project Engineer
(Continued)
City of Monterey Park Perchlorate Treatment System Procurement City of Glendale Wellhead Treatment Feasibility Study and Design Wellhead Treatment Systems – San Marino Service Area, Feasibility and Options Analysis Report Water System Master Plans
• City of Covina
• Pahrump, Nevada, included the Water System, the Sewage Collection System and Lift Stations • Fontana Water Company
• San Gabriel Valley Water Company, Los Angeles County Division City of San Luis Obispo Groundwater Development Project Review of Recycled Water Use, Forest Hills Memorial Park, Covina Hills Water Supply Feasibility Studies
• Sierra Bella Development, Lucerne Valley, California
• Sierra Lakes Development, Santa Clarita Valley, California • Rolling Meadows Development, Tejon Ranch, California
• East Highlands Ranch, Upland, California
• Larsen Ranch, Antelope Valley, California
East Raymond Basin Water Resources Plan
Rancho Cordova Perchlorate Contamination Litigation Support Groundwater Supply Development Cost Study, Laredo, Texas Groundwater Yield Review, Burleson County, Texas
Wrightwood Groundwater Study
Rincon Groundwater Study
Torrez Martinez Water Feasibility Study
Spring Creek Booster Station Design
Water Rights Appraisal – Hearst Ranch
Antelope Valley Water Rights Adjudication
LAFCO Municipal Water Service Review, Santa Clarita Valley Review of Proposal Antelope Valley Water Bank
Arrow Well Wellhead Treatment Design
Los Angeles County Department of Public Works (LACDPW) Alamitos Barrier Project - Seawater Barrier • Deficiency/Feasibility Study
• Injection Well Design
• Injection Well Construction
LACDPW Dominguez Gap Barrier - Seawater Barrier, Deficiency/Feasibility Study February 21, 2023, Reg CC Mtg., Page #307
Stetson Engineers Inc. Page 3 of 3
Jeff Helsley Box 21
RESUME
Jeff Helsley, Project Engineer
(Continued)
LACDPW West Coast Barrier Project - Seawater Barrier
• Geophysical Exploration
• Deficiency/Feasibility Study
Landfill Gas Mitigation Measures
County Solid Waste Management Plan
Montebello Forebay Groundwater Recharge Study
National Pollution Discharge Elimination System (NPDES) Permit Modifications Injection Well Maintenance Study
February 21, 2023, Reg CC Mtg., Page #308
Chaoying Jiao Box22 Page 1 of 3
RESUME
Name & Title:

Chaoying Jiao, Ph.D., P.E., Supervisor II
Project Assignment:

Hydrogeologist
Years of Experience with Firm:
<1
Years of Experience With Other Firms:
29 Education: Degree(s) / Year / Specialization:

Ph.D., Hydrogeology, University of Karlsruhe, Karlsruhe, Germany Feb.6, 2002
MS, Hydrogeology, Nanjing University, Nanjing, PR China Jul. 12, 1991 BS, Hydrogeology & Engineering Geology, Nanjing University July 1988 Registrations / Certifications:

Professional Geologist, California, No. 8367.

Certified Hydrogeologist, California, No. 971.

MODFLOW, GMS, Groundwater Vistas, Visual
MODFLOW, MODFLOW-USG, Arc GIS, Surfer,
VOXLER, Access, MS Word, Excel, Quick Basic,
FORTRAN, WellCAD
Experience Record
Dr. Jiao recently joined Stetson Engineers. Dr. Jiao’s projects at Stetson include preparation of well rehabilitation specifications, analysis of water availability from fractured rock formations in the San Bernardino Mountains, updating the groundwater model for the Santa Ynez Basin, and developing a method to calculate change in groundwater storage in the Indian Wells Valley Groundwater Basin.

Dr. Jiao is an accomplished hydrogeologist and groundwater modeler with over 29 years of experience. His professional focus is on regional groundwater resource evaluations, development and modeling. He has extensive experience in basin-wide studies, wellfield exploration, siting, design and construction management of high-capacity water supply wells and monitoring wells.

Prior Experiences:

Los Angeles Department of Water and Power
• Update Bishop Local Management Model
• Owens Lake Groundwater Evaluation Project
• Numerical and Ecological Model Improvements-Big Pine Wellfield • Numerical and Ecological Model Improvements-Taboose-Thibaut Wellfield, Los Angeles Department of Water and Power, Owens Valley, CA
• Owens Lake Groundwater Development Program Assistance • Owens Lake Groundwater Evaluation Project,
• Los Angeles County Department of Publics, CA
• West Coast Basin Barrier Project, County of Los Angeles Department of Public Works, CA Orange County Water District
• North Basin Groundwater Protection Project, Orange County Water District, CA • Design and Construction Support for the Demonstration Mid-Basin Injection Well Project, Orange County Water District, CA
City of Anaheim
• Construction oversite for Well 56, City of Anaheim, CA • Construction oversite for Well 54, City of Anaheim, CA Long Beach Water Department
• Focused Study of Well Sites in the West Coast Basin, Long Beach Water Department, CA • Well Site Feasibility Study, Long Beach Water Department, CA • Rehabilitation of North Long Beach Well 9 &11, Long Beach Water Department, CA Updating the Santa Rosa Basin Groundwater Management Plan & Evaluation of Maximum Perennial Yield, Camrosa Water District, CA
February 21, 2023, Reg CC Mtg., Page #309
Chaoying Jiao Box22 Page 2 of 3
RESUME
Chaoying Jiao, Ph.D., P.E., Supervisor II
Continued
Development of Independence-Symmes-Bairs and Lone Pine Management Model (Southern Model), Los Angeles
Alternative Remedial Design North Hollywood Operable Unit Wells NHE-2 and NHE-3, Confidential Client, North Hollywood, CA
SS-12-01 Pleasant Valley Basin Monitoring Wells Project, Camarillo Sanitary District, CA Primm Casinos – Design and Construction Supervision for Well WP-5A, The Primadona Company, LLC, Primm, NV
Construction Supervision for the Dos Palmas Water Supply Development-2010, Monitoring Well -17, Coachella Valley Water District, CA
Design, Construction Supervision and Water quality sampling Well 36, 37 and 24A, Palmdale Water District, CA
Santa Ana River Groundwater Recharge Optimization Study, San Bernardino Valley Water Conservation District/Municipal Water District, CA
Terra Cotta Well, Elsinore Valley Municipal Water District, CA Pinetree Well #2, Valencia Water Company, Valencia, CA
Pinetree Well T-7, Valencia Water Company, Santa Clara, CA Well 44, 45 & 47 Construction, Victor Valley Water District, Victorville, CA IRRP-P1, P2 and P3, Eastern Municipal Water District, Hemet, CA Rehabilitation of Dolphin Avenue Deep Well, City of Newport Beach, CA Well Asset Management Planning, Rancho California Water District, CA Condition assessment of Injection Wells Associated with the Alamitos Barrier, Dominguez Gap Barrier, and West
A regional flow and variable density model for the ALAT & KHOB aquifer in Saudi Arabia Variable density model for the UMER Aquifer in the Dammam Dome Area, Saudi Arabia Variable density model for the UMER Aquifer in the Khursaniyah Area, Saudi Arabia Delta Environmental Consultants Inc., Monrovia, CA, 2005 Geologist: Dr, Jiao performed UST site assessment and remediation; writing of work plans, well installation and abandonment reports, site closure reports, tank pull reports, and Health and Safety plans; and oversight of drillers, field work, soil and groundwater sampling, and well logging.

University of Southern California, Los Angeles, CA, 2002-2005 Research Associate: Dr. Jiao utilized flow cell and visual monitoring technique to perform experimental investigation into “Three Dimensional Miscible Porous Media Flows with Viscosity Contrasts and Gravity Override.” Funded by the US Department of Energy (DOE), this basic research has found a variety of application in groundwater protection and restoration, sequestration of carbon dioxide and radioactive waste in salt formation, and injection of hazardous liquid waste in deep aquifer, as well as in the fields of petroleum and chemical engineering.

February 21, 2023, Reg CC Mtg., Page #310
Chaoying Jiao Box22 Page 3 of 3
RESUME
University of Karlsruhe, Karlsruhe, Germany, 1997-2002
Research Associate: Funded by the German Research Foundation (DFG), Dr. Jiao performed experimental study of miscible displacement with density difference and viscosity contrast in porous media. In a large scale sand tank filled with homogeneous sand, a net of electrical sensors and piezometers was constructed to monitor the displacement of two miscible fluids with density difference and viscosity contrast, where salt solution and glycerin solution were used.

United Nations Development Program Water Management Model-Groundwater Management Model, Qingdao City, PR China, 1991-1994
Geologist: Dr. Jiao was the key member for construction of groundwater model of Dagu River Groundwater Basin. He was responsible for basin-wide water budget analysis and safe yield evaluation, reviewing geological and hydrogeological data, and preparing groundwater maps and hydrographs. He first developed a conceptual model and then constructed a numerical model to simulate groundwater flow in the basin.

February 21, 2023, Reg CC Mtg., Page #311
Stetson Engineers Inc. Page 1 of 2
John Cardoza-Box20

RESUMES
Name & Title:

John Cardoza, P.E., Supervising Engineer
Project Assignment:

Project Engineer
Years of Experience with Firm
21 Years of Experience With Other Firms
11 Education: Degree(s) / Year / Specialization:

B.S. Civil Engineering / 1990 / University of Washington, Seattle
Registrations / Certifications:

Civil Engineer No. 32761, Washington, 1995
Experience Record
Mr. Cardoza has experience in project management, civil engineering, and water resource engineering including well heads, water treatment plants, pipelines, tanks, water supply plans, hydrologic studies, basin reconnaissance studies, surface water modeling, groundwater modeling, statistical analyses, and water quality modeling. In addition, Mr. Cardoza has experience in civil design, structural analysis, and geotechnical analysis for hydroelectric and water works projects.

WELL FACILITIES DESIGN
Tract 349 Mutual Water Company – Well 2 Replacement
• Prepared Preliminary Design Report detailing design criteria for replacement of a 900 gpm municipal production well, controls, disinfection, and permitting. • Prepared design for well pump equipment, piping, backup generator, and drain connection to Los Angeles County Flood Control District’s storm drain.
• Provided engineering support through construction of site improvements. Reviewed submittals and addressed Requests for Information.

California American Water Company – Lemon Well
• Prepared design for well pump equipment, piping, and disinfection system for a 225 gpm municipal production well.
• Provided engineering support through construction of site improvements. Reviewed submittals and addressed Requests for Information.

Los Angeles County Sheriff’s Department – Pitchess Detention Center – New Well • Prepared Preliminary Design Report detailing design criteria for new 2,000 gpm well, controls, disinfection, and permitting.

Compton Well 20 Manganese Treatment
• Prepared Preliminary Design Report detailing all aspects of design criteria for manganese treatment facility on a 1,000 gpm municipal production well.
• Prepared design for piping, 27,000 gallon steel backwash tank, backwash booster pump, backup generator, and site improvements.
• Provided engineering support through construction of site improvements. Reviewed submittals and addressed Requests for Information.

WATER TREATMENT FACILITIES – DESIGN AND PROJECT MANAGEMENT Main San Gabriel Basin Watermaster, California
• Project Coordinator for the Baldwin Park Operable Unit (BPOU) projects involving design, construction, and operation of four (4) water treatment plants, 34,000 feet of pipelines, and wells totaling approximately 22,000 gpm treatment capacity. Prepared correspondence, responses, and coordination with EPA, DDW, water purveyors and Watermaster for the BPOU.
• Prepared Preliminary Design Report for the Watermaster’s Plan for the BPOU. • Investigated alternatives for disposing of well development water from BPOU. • Reviewed water quality issues and soil aquifer treatment for the Recycled Water Project. • Provide ongoing management and coordination of water treatment facilities with water companies, Cooperating Respondents (polluters), and EPA.

February 21, 2023, Reg CC Mtg., Page #312
Stetson Engineers Inc. Page 2 of 2
John Cardoza-Box20

RESUMES
City of Monterey Park, California
• Project Engineer responsible for the design of the Granular Activated Carbon Treatment System at the City of Monterey Park’s Delta Plant.

San Gabriel Valley Water Company, Baldwin Park, California • Involved in design and project coordination of B5 and B6 Treatment Facilities for removal of VOC’s, Perchlorate, and NDMA from local groundwater.
• Investigated calcification of treatment system.
• Evaluated liquid-phase granular activated carbon versus air strippers for removal of VOCs.

Valley County Water District, Baldwin Park, California
• Involved in design and project coordination of Arrow/Lante Treatment Facilities for removal of VOC’s, Perchlorate, and NDMA from local groundwater.

PIPELINE DESIGN
Glendora Country Club Reservoir and Pipeline
• Involved in design and project coordination for new 660,000 gallon welded steel reservoir, site piping, and storm drains
• Provided engineering support through construction of site improvements. Reviewed submittals and addressed Requests for Information.

City of Chino, California
• Managed and conducted QA/QC reviews of pipeline designs for Mountain Avenue (3,400 feet), Edison Avenue (11,700 feet), Schaefer Avenue (6,000 feet), and Airport Water Main (22,000 feet). • Prepared Preliminary Design Reports.
• Investigated alternative pipeline alignments.

Los Valles Development Booster Pump Station and Pipeline • Prepared Preliminary Design Report reviewing hydraulics and establishing design criteria for new 8,600 foot long pipeline and booster pump station to deliver 3,300 gpm to new development. • Project Engineer responsible for design of booster pump station and 12, 16, and 20-inch diameter pipelines totaling 3,100 feet of pipeline.

Valley County Water District – Baldwin Park Operable Unit Superfund Project • Responsible for project management for the design of a 30-inch diameter, 20,000 foot long pipeline to convey treated water from treatment plant to neighboring water distribution system. • Responsible for project management for the design of 3,000 feet of 16 to 24-inch raw water pipeline conveying contaminated groundwater from wells to a water treatment facility.

San Gabriel Valley Water Company – Baldwin Park Operable Unit Superfund Project • Responsible for project management for the design of two 24 to 30-inch raw water pipelines totaling approximately 6,000 feet long, conveying contaminated groundwater from wells to a water treatment facility.

La Puente Valley County Water District, La Puente, California • Designed a pipeline interconnection to supply treated groundwater to Suburban Water Systems. • Coordinated preparation and review of testing protocol for a low pressure ultraviolet treatment process to remove NDMA and 1,4-Dioxane from contaminated groundwater.

Los Angeles County Sheriff’s Department – Pitchess Detention Center – Replacement of Corroded Pipes • Conducted evaluation of extensive pipe corrosion caused by microbiologically influenced corrosion (MIC). • Prepared Technical Memorandum presenting results of evaluation and alternatives to mitigate corrosion including complete replacement of pipes, slip lining, pipe splitting, and cathodic protection.

February 21, 2023, Reg CC Mtg., Page #313
Stetson Engineers Inc. Page 1 of 2
Sam Lo Box 20

RESUMES
Name & Title:

Sam Lo, P.E., Senior Engineer
Project Assignment:

Project Engineer
Years of Experience with Firm
19 Years of Experience with Other Firms
1 Education: Degree(s) / Year / Specialization:

B.S. Environmental Engineering / 2001 / University of
California, Irvine
Registrations / Certifications:

P.E. No. 47487, State of Washington, 2010
Environmental Management, UC Irvine, 2002
Experience Record
Mr. Lo has experience in water resource engineering including the permitting and design of new wells, groundwater treatment facilities and pipelines, project management, CEQA compliance including preparation of Initial Environmental Studies, SCAQMD permit applications, and preparation of water system master plans, water rights and supply evaluation.

WELL & WELLHEAD DESIGN
California American Water Company – Richardson Well
• Project Engineer for permitting and design for a 1,500 gpm municipal production well. Prepared well design and specifications. Procured NPDES and LACDPW permits for well discharges.

Tract 349 Mutual Water Company – Well No. 2
• Project Engineer for permitting and design for a 900 gpm municipal production well. Prepared well design and specifications. Procured NPDES and LACDPW permits for well discharges and AQMD permit for installation of emergency generator.

California American Water Company – Lemon Well
• Project Engineer for permitting and design for a 225 gpm municipal production well. Prepared well design and specifications. Procured NPDES and LACDPW permits for well discharges.

TREATMENT PLANT DESIGN
Valley County Water District, Baldwin Park, California
• Valley County Water District’s Arrow Lante Treatment Facility Project: The project includes site, structural, mechanical and electrical engineering for the installation of Calgon Carbon Corporation ISEP and Trojan Technologies UV treatment equipment designed to clean contaminated groundwater to California drinking water standards. Assist in design of treatment systems. Create engineering plans using AutoCAD. Assist with preparation of Specifications and Contract Documents.

City of Monterey Park, California
• Design of the Granular Activated Carbon Treatment System at the City of Monterey Park’s Delta Plant.

PROJECT AND CONSTRUCTION MANAGEMENT – TREATMENT PLANTS AND WELLS San Gabriel Valley Water Company, Baldwin Park, California • Managed and supervised the construction of the Single Pass Ion Exchange system for the treatment of Perchlorate. Perform construction management duties including routine field visits to track and document construction progress, process change order requests, and provide clarifications to contractors on design.

February 21, 2023, Reg CC Mtg., Page #314
Stetson Engineers Inc. Page 2 of 2
Sam Lo Box 20

RESUMES
Sam Lo, Project Engineer
(Continued)
Pala Band of Mission Indians, California
• Managed and supervised the construction of six (6) groundwater extraction wells and two (2) groundwater monitoring wells.

La Puente Valley County Water District, California
• Supervised the construction of groundwater extraction well and coordination with United States Environmental Protection Agency and Los Angeles County Department of Public Works on the disposal of well development water.

PIPELINE DESIGN
San Gabriel Valley Water Company, Baldwin Park, California • San Gabriel Valley Water Company’s Plant B6 Raw Water Pipeline and Treated Water Pipeline: Conduct preliminary design research including field verification and utility search. Assist in design of two 24 to 30- inch diameter pipelines totaling approximately 6,000 feet long. Create engineering plans using AutoCAD.

Assist with preparation of Specifications and Contract Documents. • San Gabriel Valley Water Company’s Plant B5 Onsite Treatment Process Pipeline: Assist in design of pipelines. Create engineering plans using AutoCAD. Assist with preparation of Specifications and Contract Documents.

Los Valles Development, Castaic, California
• Los Valles Development’s Recycled Water Pipeline: Conduct preliminary design research including field verification and utility search. Assist in design of 16-inch diameter, 8,600 foot long pipeline. Create engineering plans using AutoCAD. Assist with preparation of Specifications and Contract Documents.

Upper San Gabriel Valley Municipal Water District, El Monte, California • Upper San Gabriel Valley Municipal Water District’s Recycled Water System Retrofits: Design of onsite recycled water system pipelines. Create engineering plans using AutoCAD. Assist with preparation of Specifications and Contract Documents.

PROJECT AND CONSTRUCTION MANAGEMENT – PIPELINES
Upper San Gabriel Valley Municipal Water District, El Monte, California • Upper San Gabriel Valley Municipal Water District’s Package 3 & 4 Recycled Water Pipelines: Perform construction management duties including routine field visits to track and document construction progress, process change order requests, and provide clarifications to contractors on design.

February 21, 2023, Reg CC Mtg., Page #315
Stetson Engineers Inc. Page 1 of 1
6_Heather Steele-Box21

RESUMES
Name & Title:

Heather Steele, P.E., Senior Associate
Project Assignment:

Project Engineer
Years of Experience with Firm
7 Years of Experience with Other Firms
0 Education: Degree(s) / Year / Specialization:

B.S. Civil Engineering / 2010 / California State Polytechnic University, Pomona
M.S. Water Resources Engineering / 2013 / University of Stuttgart, Germany
Registrations / Certifications:

E.I.T. No. 139551, State of California, July 16, 2010
P.E. No. 87237, State of California, June 1, 2017
Experience Record
Ms. Steele has experience in water resource engineering including water supply plans, groundwater basin management, environmental compliance, water rights evaluations, water system master plans, hydrologic studies, water quality studies, and grant writing.

Indian Wells Valley Groundwater Authority
• Prepared grant funding applications under Proposition 1 • Developed a comprehensive Groundwater Sustainability Plan for Indian Wells Valley Groundwater Basin in compliance with the requirements of the Sustainable Groundwater Management Act. • Prepared Annual Reports.

City of La Habra
• Prepared alternative Groundwater Sustainability Plan for Sustainable Groundwater Management Act compliance.
• Prepared Annual Reports.

Morongo Band of Mission Indians
• Evaluated water rights under the Practicably Irrigable Acreage standard.

Upper San Gabriel Valley Municipal Water District
• Prepared Feasibility Study to evaluate recycled water treatment alternatives. • Developed Title 22 Engineering Report for an indirect potable reuse recycled water project. • Developed CEQA Initial Study and NEPA Environmental Assessment for an indirect potable reuse recycled water project.
• Prepared Urban Water Management Plans.

Main San Gabriel Basin Watermaster
• Developed Salt and Nutrient Management Plan including determining basin assimilative capacity and conducting antidegradation analyses.
• Developed program-level CEQA environmental compliance document.

Raymond Basin Watermaster
• Developed Salt and Nutrient Management Plan including determining basin assimilative capacity and conducting antidegradation analyses.
• Developed program-level CEQA environmental compliance document.

City of Glendora
• Prepared comprehensive water system Master Plan.

Three Valleys Municipal Water District
• Analyzed opportunities and constraints for the use of treated groundwater to reduce imported water demands.

February 21, 2023, Reg CC Mtg., Page #316
Principal
Proj.

Manager
Proj
Engineer Sr Engineer
Assoc
Engineer Clerical Direct Total Task Totals
Task Description $249 $249 $216 $173 $129 $108 Costs Cost Cost 1 GENERAL PROJECT ADMINISTRATION & MEETING $ 7,600

1.1 Project Management 2 10 8 2 $ 4,900

1.2 Attend Routine Progress Meeting 4 8 $ 2,700
2 DATA RESEARCH & INVESTIGATION $ 27,000

2.1 Data Collection and Review 10 4 16 6 $ 5,600

2.2 Review West Coast Basin Hydrogeology 30 8 8 $ 8,900

2.3 Analysis of Potential Sites in the West Coast Basin 2 4 34 6 10 $ 11,200

2.4 Field Reconnaissance 6 $ 1,300
3 PRELIMINARY WELL FEASIBILITY REPORT 2 4 30 4 20 10 $ 12,300 $ 12,300 4 FINAL WELL FEASIBILITY REPORT 2 6 2 10 2 $ 3,600 $ 3,600 Total Scope of Work (Tasks 1-4) 6 24 132 24 64 20 $ - $ 49,200 $ 50,500 4 26 $ 4,400 $ 4,400
4 26 $ 4,400 $ 4,400
6 28 132 24 90 20 $ 53,600 $ 54,900
Stetson Engineers Inc.

City of Lomita - New Ggroundwater Well Feasibility Study Estimated Engineering Fees - Submitted January 17, 2023

OPTIONAL WORK
Task 5 - Funding Research*
Subtotal of Optional Tasks
Sum of Non-Optional and Optional Costs
Footnote:
*Assumes 30 hours for funding research, as directed in the Request for Proposal.

Page 1 of 1 ends

February 21, 2023, Reg CC Mtg., Page #317
Standard Billing Rate Schedule
Professional Fees
Principal $249.00 Per Hour
Special Project Director $249.00 Per Hour
Project Manager, Senior $216.00 Per Hour
Supervisor I $216.00 Per Hour
Supervising Soil Scientist $201.00 Per Hour
Supervisor II $201.00 Per Hour
Supervisor III $195.00 Per Hour
Senior I $173.00 Per Hour
Senior II $156.00 Per Hour
Senior III $141.00 Per Hour
Construction Manager $141.00 Per Hour
Construction Manager / Oversight $124.00 Per Hour
Senior Construction Inspector $124.00 Per Hour
Senior Field Geologist $141.00 Per Hour
Senior Associate $135.00 Per Hour
Associate I $129.00 Per Hour
Associate II $121.00 Per Hour
Associate III $116.00 Per Hour
Associate Soil Scientist $116.00 Per Hour
Senior Assistant $108.00 Per Hour
Assistant I $103.00 Per Hour
Assistant II $98.00 Per Hour
Assistant Soil Scientist $98.00 Per Hour
Assistant III $93.00 Per Hour
GIS Manager $129.00 Per Hour
GIS Specialist I $106.00 Per Hour
GIS Specialist II $96.00 Per Hour
Technical Illustrator $93.00 Per Hour
AutoCAD Technician $93.00 Per Hour
Soil Technician $81.00 Per Hour
Aide I $75.00 Per Hour
Aide II $65.00 Per Hour
Aide III $60.00 Per Hour
Project Coordinator I $141.00 Per Hour
Project Coordinator II $103.00 Per Hour
Project Coordinator III $93.00 Per Hour
Contract Management $108.00 Per Hour
Administrative I $75.00 Per Hour
Administrative II $70.00 Per Hour
Administrative III $65.00 Per Hour
Effective January 1, 2023
February 21, 2023, Reg CC Mtg., Page #318
Direct Expense Rates
Expense Description Billing Rate
Mileage $* / Mile
Reproduction: Black & White (In-House) $0.15 / Page
Reproduction: Color - 8.5" x 11" (In-House) $0.89 / Page Reproduction: Color - 11" x 17" (In-House) $1.89 / Page Plotter Reproduction (In-House) $1.50 / Sq. Ft.

Survey Equipment $120.00 / Day
Notes:
1) * Mileage is billed at the current IRS approved mileage rate and may be subject to change. 2) Subcontractor services will be charged at cost plus 10% administration fee. 3) All other project reimbursable expenses (i.e. telephone, commercial transportation, meals, lodging, postage, outside reproduction, etc.) will be billed at cost.
4) Testimony fees are 150% of standard rates and apply to depositions, court time and time spent on stand-by at attorney's request. Travel time and preparation time is charged at standard rates. Stetson Engineers Inc. authorizes only staff at associate classification or higher to testify as expert witnesses.

February 21, 2023, Reg CC Mtg., Page #319

PAGE INTENTIONALLY LEFT BLANK
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Brianna Rindge, Community & Economic Development Director MEETING DATE: February 21, 2023
SUBJECT: Discussion and Review of General Plan Update

RECOMMENDATION
No specific action requested, for discussion and review of the General Plan process.

BACKGROUND
Simply put, the purpose of a General Plan is to guide land use planning decisions. The document expresses the community’s development goals and embodies public policy relative to the distribution of future land uses, both public and private. Under State law, subdivisions, capital improvements, development agreements, and many other land use actions must be consistent with the adopted General Plan.

Lomita most recently updated its general plan in 1998 – 25 years ago – and since then, a lot has changed. While Lomita’s population has grown by 2.5%, development patterns and the range of housing types have transformed. Downtown Lomita has come to life.

The city is diversifying in both population and businesses alike. The COVID-19 pandemic has brought about new practices and uses that have yet to be incorporated into the city’s regulations. New projects have replaced former business types that have phased out.

New modes of transportation exist and previously considered modes have increased in popularity. Traffic along commercial corridors such as Pacific Coast Highway, Lomita Boulevard, and Western Avenue has grown, also increasing the number of visitors to the city. New land uses have come about but are not specifically provided for within Lomita’s existing code. Last, the Legislature has adopted numerous local requirements with which the City has yet to fully comply.

Recognizing the need for an update, City Council included a foundation of funding within its Strategic Plan over the past few years. With a new, permanent Community and Economic Development director, an approved Safety Element, a successfully certified Housing Element, and new State mandates, the time is right for Lomita to release a Item No. SCH 8b

CITY OF LOMITA

CITY COUNCIL REPORT
February 21, 2023, Reg CC Mtg., Page #320
2 Request for Proposal (RFP) for an update its General Plan and zoning ordinance.

ANALYSIS
Lomita’s certified Housing Element projects over 1,000 new housing units across the current planning period which runs through 2029 and the city must thoroughly evaluate the impacts of such growth on the community. A comprehensive update to the General Plan allows for consideration of current and future needs in areas such as land use, housing, transportation, public services, environmental quality, and economic viability.

The State established several deadlines by which every jurisdiction shall comply in addition to the requirement to rezone per the Housing Element by October 15, 2024 and the remaining certified Programs.

General Plan Element Update Status
Safety Updated & adopted December 2021
Housing Updated & certified October 2022
Land Use Update triggered by Housing Element update (rezone required by October 2024)
Circulation Update required by January 2025 per SB 932
Resource Management
(to be renamed Open
Space & Conservation)
Update required by January 2026 per SB 1425
Noise Update triggered by Land Use update
Economic Development Updated 1998; to be incorporated into other elements Implementation Updated 1998; to be incorporated into other elements The Land Use Element reflects the community’s vision, promoting thoughtful, equitable, and accessible distribution of different land uses, including residential, commercial, industrial, agricultural, and open space, and shall align with the other general plan elements. The Noise Element contains a set of goals, policies and implementation measures to limit noise exposure, particularly in areas with nearby housing, hospital, school or daycare center uses. The Circulation Element is a strategy addressing infrastructure needs for the circulation of people, goods, energy, water, sewage, storm drainage, and communications and must correlate directly with the Land Use Element.

The Open Space and Conservation Element identifies areas that provide value in an essentially undeveloped condition and creates a plan to preserve such areas. The open space portion reinforces conservation by guiding the comprehensive and long-range preservation of open space lands that are important to the conservation of the city’s natural resources (land, water, ecosystem services, and living resources).

Relation to Housing Element
California Government Code § 65585(i) grants the State Department of Housing and Community Development (HCD) the authority to review any action or failure to act by a local government that it determines is inconsistent with the adopted Housing Element and HCD has subsequently formed the Housing Accountability Unit. The requested scope of work achieves progress in 10 of the 31 adopted Housing Element Programs as required February 21, 2023, Reg CC Mtg., Page #321
3 by HCD as follows.

Program Description
28 Work with developers & community to explore opportunities to rezone areas ideal with density minimums for increased housing capacity through an update to the General Plan
14 Rezone per certified Housing Element due October 15, 2024 11 Develop design objective standards to help facilitate quality design paired with the increase in density as part of Program 14
30 Consider an inclusionary ordinance to pair with the rezoning of sites based on an economic feasibility analysis
7 Improve development regulations intended to incentivize affordable and mixed-income housing development through regulatory inducements such as incentive zoning paired with objective development standards 29 Amend zoning code to streamline, update, and simplify regulations related to housing, where possible
29 Update regulations in response to State legislative changes 12 Increase permitted density along Lomita Blvd.
12 Provide additional lot consolidation incentives to qualifying sites identified in the Sites Inventory Form
3 Analyze existing mobile home park regulations
12 Allow standalone residential in mixed-use zones
13 Permit large care residential facilities in commercial & mixed-use zones 27 Reduce multifamily parking requirements
27 Reduce parking for religious institutions in exchange for housing development (AB 1851)
RFP Timeline
Staff proposes the following timeline for the RFP process.

Date Action
February 22, 2023 RFP release
March 15, 2023 at 11:00 a.m. Pre-Bid Informational Meeting for Interested Consultants via Microsoft Teams
March 16, 2023 by 5:30 p.m. Addendum posted on City website with responses to questions and any changes to
RFP requirements
March 27, 2023 at 9:00 a.m. Proposals due
March 27-30, 2023 Interviews
April 3, 2023 Selection of consultant
April 18, 2023 at 6:00 p.m. Contract approval and Notice to Proceed Completion of project deliverable 2-3
years from Notice to Proceed
Contract Term
Summer 2023 Creation of General Plan Advisory Committee February 21, 2023, Reg CC Mtg., Page #322
4 Project Process
The focus of the Update is to respond to changes in the community and in circumstances that affect the future direction of Lomita. The updates will be based upon the results of a comprehensive visioning process and public engagement program to ensure that all facets of the community participate and are fully represented in shaping Lomita’s future.

The entire process is expected to take approximately 2-3 years.

The City intends to form a General Plan Advisory Committee (GPAC), appointed by City Council and formed with the assistance of the consultant, and a Technical Advisory Committee (TAC) to be comprised of technical experts from City departments and partner agencies to provide feedback and ensure plan concepts are achievable. The consultant will release a community survey, maintain a webpage dedicated to the project, and ensure information is included in the City’s newsletter. The City expects to brand the Update with one simple phrase and logo.

Next, the consultant will produce a “Draft Existing Conditions Background Report” containing a summary of findings, data, assumptions, and a draft outline of the preliminary General Plan and prepare a Strengths, Weaknesses, Opportunities, and Threats (S.W.O.T.) Analysis of the existing General Plan and zoning ordinance. The Consultant will include GPAC and TAC input to create a “Final Background Report” which will be presented to Planning Commission and City Council.

The GPAC and TAC will review consultant’s evaluation of growth alternatives and identified policy options. Planning Commission and City Council will provide direction regarding the “Preferred Alternative”. The consultant will draft implementation strategies to include feasible actions the City will undertake to implement each of the goals, policies, and objectives. The GPAC and TAC move through a series of reviews along with community meetings. City Council and Planning Commission will hold public hearings on the Draft Update and, subsequently, the Final General Plan Update. The consultant will assist with zoning code updates as necessitated by the final document.

General Plan Advisory Committee
The ad-hoc GPAC is intended to represent a cross-section of the Lomita community.

Generally, a GPAC’s role is to provide input, feedback, and recommendations to the selected consultant, City staff, the Planning Commission, and ultimately to the City Council regarding key components and elements of the General Plan throughout its development. The GPAC is a discussion body designed to bring the many facets of the community to the table to help shape the vision for the City’s guiding documents. All GPAC meetings will be open to the public. In order to ensure the GPAC is representative of the community at large, staff encourages City Council to consider including individuals from the following non-exhaustive list of groups on the GPAC. • Parks and Recreation Commission
• Public Safety and Traffic Commission
• Lomita Chamber of Commerce/businesses
• Long-time residents
February 21, 2023, Reg CC Mtg., Page #323
5 • Newer residents
• Multiple generations
• Real estate industry
• Development community
• School district
• Fire and/or Police Department
CEQA Compliance
The chosen consultant will also prepare an Administrative Draft, Draft, and Final Environmental Impact Report (EIR), conduct all public reviews in accordance with the California Environmental Quality Act (CEQA) to create thorough and defensible CEQA documentation, and file all required notices. The City is interested in exploring the possibility of a General Plan EIR that will assist in streamlining and exempting future projects from CEQA with the idea that the General Plan EIR can be used for such exemptions when projects are consistent with the General Plan.

OPTIONS

1. No action; staff will release RFP

2. Discuss, and suggest amendments

FISCAL IMPACT
The RFP requests budget details within the proposals, but based on other cities’ experience, the cost can be expected to exceed $1 million for the General Plan Update and related CEQA documentation. If the consultant opts for a comprehensive zoning code update to include rezoning for West Lomita Blvd., this can be expected to cost an additional $200,000-$300,000. While patchwork zoning code updates may be less costly, it may also present conflicts that a wholistic review could avoid. The project is expected to occur over a 2- to 3-year period and utilize funding from the General Plan Update Fund of the City’s Biennial Budget. This Fund is projected at $600,000 by June 30, 2023, with additional funding planned for coming fiscal years. In addition, staff is actively seeking further funding opportunities through various state and federal grants and programs.

ATTACHMENTS

1. Draft Request For Proposals
February 21, 2023, Reg CC Mtg., Page #324
6 Reviewed by: Approved by:

Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by:
________________
Brianna Rindge
Community & Economic Development Director
February 21, 2023, Reg CC Mtg., Page #325

Page 1 of 12 ends

REQUEST FOR PROPOSALS
to
Prepare a General Plan Update, Comprehensive Zoning Code and Map Update, Objective Design and Development Standards, and CEQA Document Preparation
City of Lomita
Community & Economic Development Department
Attn: Brianna Rindge, AICP, Community & Economic Development Director 24300 Narbonne Ave.

Telephone: (310) 325-7110 x 122
Email: [email protected]
Release Date: February 22, 2023
Deadline for Submission: March 27, 2023 at 9:00 a.m. via email Attachment No 1
February 21, 2023, Reg CC Mtg., Page #326

Page 2 of 12 ends

REQUEST FOR PROPOSALS
I. OBJECTIVE
The City of Lomita seeks written proposals from qualified consulting firms to update certain elements of the city’s General Plan, zoning ordinance and maps, objective design and development standards, and related environmental review in conformance with the California Environmental Quality Act (CEQA). The Proposer’s team for this project should be multi-disciplinary and shall include expertise in all appropriate areas of General Plan and zoning ordinance development.

The focus of this project is to respond to changes in the community and in circumstances that affect the future direction of Lomita. The updated General Plan will be based upon the results of a comprehensive visioning process and public engagement program to ensure that all facets of the community participate and are fully represented in shaping Lomita’s future.

Responsive proposals will describe the approach, process, and costs to:
• Prepare a comprehensive update to the General Plan;
• Prepare a new comprehensive Zoning Code and Zoning Map including illustrated community design standards and guidelines for single-family and multiple-family residential, commercial, and mixed-use developments;
• Plan and conduct associated public outreach and involvement activities; • Prepare necessary environmental review and clearances in accordance with CEQA; and • Optional development of Zoning Handbook, Infill Guidelines Handout and Objective Standards of Development Handout(s).

II. GENERAL INFORMATION
The city of Lomita is known as a friendly, small-town community located at the base of the Palos Verdes Peninsula in Los Angeles County. Lomita is 1.97 square miles (total area is 1,261 acres) with a population of approximately 21,000. The city is located 26 miles south of downtown Los Angeles and bounded by the Torrance to the north and west, Los Angeles to the east, Rolling Hills Estates to the southwest, and Rancho Palos Verdes and unincorporated Los Angeles County area to the south.

Lomita “began” as a residential tract (Lomita Subdivision) in the early 1900s. In 1907, the Lomita Subdivision covered seven square miles. In the 1940s and 1950s, portions of the Lomita Subdivision were annexed by adjacent cities. By 1964, only 1.97 square miles of the Lomita Subdivision remained when the City of Lomita finally incorporated on June 30, 1964. Lomita is a contract city with a Council-Manager form of government. The city council is elected at large to four-year terms. The mayor is selected by the city council for a one-year term. Lomita is considering transitioning to city council districts, with a decision expected in May 2023. Following the district formation process, the city would be divided into five separate districts in 2024.

In 1990, Lomita seceded from the Los Angeles County water district and assumed complete control and operation of a new water district serving the community. The City serves water to approximately 4,300 connections. Of these, the vast majority are residential connections (94%), with the majority of residential connections being single-family residential (3,712 connections).

February 21, 2023, Reg CC Mtg., Page #327

Page 3 of 12 ends

The city is almost entirely built-out. Existing development within the city is characterized by residential neighborhoods at varying densities, with commercial uses concentrated along Pacific Coast Highway, Lomita Boulevard, Crenshaw Boulevard, Narbonne Avenue, and Western Avenue. Much of the city is comprised of single-family residential homes with many large lots providing in-fill housing opportunities.

Narbonne Avenue includes a combination of residential, commercial, and mixed-use of which the northern section is a quaint downtown and civic center area. The commercial corridors are underutilized and offer potential locations for new commercial, mixed-use, and high-density residential in accordance with the goals and objectives of the recently updated Housing Element. With its proximity to employment centers, coupled with its central location and excellent neighborhoods, Lomita is poised to leverage its location for continued housing, job creation, and economic growth that can improve the quality of life for residents. A key issue in planning for and facilitating the level of growth called for in the City’s Housing Element and upcoming General Plan update is utilization of land use, design, and development standards that strategically protect the low-density neighborhoods while supporting more intense development along the commercial corridors.

III. BACKGROUND
General Plan
Lomita’s General Plan was last comprehensively updated and adopted in 1998 with various amendments since. Of note, in 2005 and 2014, a General Plan Advisory Committee (GPAC) provided recommendations related to economic development, downtown revitalization, and circulation improvements. The current General Plan is comprised of 8 elements.

February 21, 2023, Reg CC Mtg., Page #328

Page 4 of 12 ends

Lomita General Plan Element Update Status
Safety Updated & adopted December 2021
Housing Updated & certified October 2022
Land Use Update triggered by Housing Element update (rezone required by October 2024)
Circulation Update required by January 2025 per SB 932
Resource Management
(Open Space & Conservation)
Update required by January 2026 per SB 1425
Noise Update triggered by Land Use update
Economic Development Updated 1998; to be incorporated into other elements Implementation Updated 1998; to be incorporated into other elements This General Plan update is envisioned as a major update of the Land Use, Circulation, Open Space, and Noise elements, although minor revisions to the Housing Element and Safety Element may be necessary to provide consistency with the other elements. The Economic Development and Implementation elements are anticipated for incorporation into the other elements to ensure these factors are considered in all aspects of future planning and development. The Consultant is strongly encouraged to recommend an approach or vision for this project that will result in an innovative, user-friendly General Plan document that promotes thoughtful consideration of the future needs of the community and allows adequate flexibility for the changing needs of the Lomita’s residents.

Zoning Code
The City’s current zoning code is decades old and has been modified through various amendments to keep up with changes and new State requirements. The City is considering a complete overhaul of its current Zoning Ordinance and Map to be consistent with the updated General Plan. This would involve a repeal and replacement of the existing code. If not recommended, the City expects draft ordinances in accordance with the final adopted elements. The state of the current zoning code is as follows. • The code includes antiquated use tables, use classifications, and land use definitions. • It contains standards that are outdated, difficult to administer, and difficult to find. • It is not user-friendly and lacks graphics to improve readability. • The code does not reflect recent changes resulting from legal decisions and changes to state laws (i.e. SB 35, Telecommunications, WELO, etc.)
• The code lacks the ability to address modern development trends and patterns in the city's corridors, mixed-use and overlay areas.

Progress on Housing Element Programs
While the City does not seek further assistance on the recently adopted Housing Element, the Update will include progress on the following Housing Element programs. • Program 3 – analysis of mobile home park regulations; • Program 7 – affordable and mixed-income housing incentives paired with objective development standards;
• Program 11 – objective design standards to facilitate increase in density; • Program 12 – allow standalone residential in Mixed-Use Overlay; additional lot consolidation incentives; increase permitted density along Lomita Blvd.; February 21, 2023, Reg CC Mtg., Page #329

Page 5 of 12 ends

• Program 13 – permit large care residential facilities in commercial and mixed-use zones; • Program 14 – rezone due October 15, 2024;
• Program 27 – reduce multifamily parking requirements; reduce religious institution parking requirements in exchange for housing development consistent with AB 1851; • Program 28 – coordinate with developers to identify areas idea for density minimum implementation;
• Program 29 – update regulations in response to legislative amendments; streamline and simplify housing regulation; and
• Program 30 – consider an inclusionary ordinance to pair with the rezoning of sites based on an economic feasibility analysis.

Resources
The City recommends review of the following documents when preparing the proposals. • Existing City of Lomita General Plan: lomitacity.com/general-plan • Lomita Zoning Code: library.municode.com/ca/lomita/codes/code_of_ordinances • Downtown Design Guidelines: lomitacity.com/wp-content/uploads/2021/11/Downtown-DesignManual.pdf • Bicycle and Pedestrian Master Plan: lomitacity.com/wp-content/uploads/2021/11/LomitaBPMP_Final2.pdf • 2022 Water Master Plan: lomitawater.com/conservation
• Urban Water Master Plan: https://www.lomitawater.com/wp-content/uploads/2021/06/LomitaFINAL-2020-UWMP-June-2021.pdf IV. SCOPE OF WORK
The Consultant will develop a final work program in conjunction with City staff. The scope of work for the update to the City’s General Plan, Zoning Ordinance and Map, and objective design and development standards should include the following.

1. Project and Community Outreach
a. The City intends to form a General Plan Advisory Committee (GPAC), appointed by City Council and formed with the assistance of the Consultant, consisting of members from the Parks and Recreation Commission, Public Safety and Traffic Commission, Lomita Chamber of Commerce and at-large community members.
b. A Technical Advisory Committee (TAC) will be comprised of technical experts from City departments and partner agencies to provide feedback and ensure plan concepts can be achieved.
c. The Consultant(s) will lead a community survey to understand the community’s wants, needs, and concerns.
d. A website will be created within the City’s existing website or separately for the General Plan and Zoning Code Update, so residents and community members can follow along with the project timeline as well as important dates, documents and events. e. The Consultant(s) will provide language to be included within the City’s newsletter regarding project updates.
f. The entire project will be branded with one simple phrase and logo. g. Consultant(s) will be expected to attend any public hearings or community workshops (projected 8 public hearings, 4 community workshops, and 8 GPAC meetings).

February 21, 2023, Reg CC Mtg., Page #330

Page 6 of 12 ends

2. Existing Conditions Report
a. Consultant(s) will produce an “Administrative Draft Existing Conditions Background Report” containing a summary of findings, data, assumptions, and a draft outline of the preliminary General Plan.
b. Based on the Draft Existing Conditions Report, prepare a Strengths, Weaknesses, Opportunities, and Threats (S.W.O.T.) Analysis of the existing General Plan and zoning ordinance. City staff will detail the experience working with the existing General Plan and zoning ordinance and prioritize a list of major policy issues. c. The Consultant(s) and Planning staff will facilitate TAC and GPAC review of the draft report.
d. Based on TAC and GPAC comments, the Consultant(s) will revise and update the document to create the Final Background Report.
e. The Final Report will be presented to both the Planning Commission and City Council at a joint study session.

3. Evaluating Alternatives
a. Land Use Alternatives and Policy Option Topic - The Consultant(s) and staff will develop an existing trends scenario and alternative Land Use concepts. The Consultant(s) will prepare at least one land use alternative concept that focuses on future growth and development to the existing undeveloped and/or underutilized areas within the city. In addition to land use concepts, the Consultants and staff will identify policy option topics to address key programmatic issues and opportunities. The Consultants and staff will review existing land use designations and develop a set of updated land use designations on which to base the land use alternative concepts. The land use designations will include allowed uses and standards of population density and building intensity as well as guidelines for urban form. The designations will be illustrated with graphics and images to show the intended development outcome. The Consultants will provide technical analysis to estimate a balanced land supply for the different components of market demand through the planning horizon year.
b. Evaluate Growth Alternatives and Identify Policy Options - Using the Alternatives Concepts, the Consultant and staff will develop population and employment projections based on buildout of each alternative. The Consultant will evaluate the land use alternatives in terms of impacts on an identified set of topics, such as existing/programmed public facilities or networks, the natural environment, the economy, greenhouse gas emission reduction, and City finances. The Consultant will address the fiscal implications of each alternative in five-year increments within the 20-year planning horizon. The Consultants and staff will develop policy options to address identified key assets, issues, and opportunities.
c. The Consultant(s) and Planning staff will facilitate TAC and GPAC review of the draft alternatives report.
d. Based on direction from the Planning Commission and the City Council, the Consultants and staff will prepare a Preferred Alternative land use diagram and description, as well as a set of preferred policy options to address identified assets, issues, and opportunities.

February 21, 2023, Reg CC Mtg., Page #331

Page 7 of 12 ends

4. Administrative Draft General Plan
a. Consultant(s) to prepare comprehensive implementation strategy that includes specific, feasible actions the City will undertake to implement each of the goals, policies, and objectives.
b. An administrative draft shall be prepared for review by City staff and the TAC. Comments received shall be incorporated into the public review draft.

5. Draft General Plan Update
a. The consultant shall conduct GPAC and community meetings, and other methods of outreach, following preparation and release of the draft to present the plan and to receive public comment and input.
b. Public Review Draft- 6 hard copies plus electronic copy in Word and PDF format. c. Planning Commission and City Council public hearing(s) on Draft (attendance/facilitation and meeting materials, including staff report, as necessary). d. At the discretion of the City, joint meetings of the City Council and Planning Commission may be convened and shall constitute as one meeting.

6. Final General Plan Update
a. Consultant shall make any final revisions to the General Plan based on changes adopted by the City Council. Consultant shall coordinate printing of the adopted General Plan as may be necessary.
b. Adopted General Plan- 10 hard copies plus electronic copy in Word and PDF format; graphics/maps in GIS shapefiles.

7. Zoning Code and Map Update - The Update will require amendments to conform to the recently adopted Housing Element and policy direction from the General Plan update, including but not limited to the following.
a. Rezoning due October 15, 2024 per State mandate
b. Use regulations identifying permitted and conditionally permitted uses consistent with the policies applicable to the General Plan land use designations c. Minimum and maximum development intensities consistent with the General Plan land use policies
d. Updates for residential development standards including mobile home park regulation, affordable and mixed-income housing incentives, allowance of standalone residential within mixed-use areas, additional lot consolidation incentives, increased permitted density along Lomita Blvd., allowance of large care residential facilities in commercial and mixeduse zones, reduced multifamily parking requirements, reduced religious institution parking requirements in exchange for housing development consistent with AB 1851, coordination with developers for identification of areas for density minimum implementation, streamlined and simplified housing regulation, updated regulations in response to legislative amendments, and consideration of an inclusionary housing ordinance paired with the rezoning determined through an economic feasibility analysis e. Establishment of new base districts and/or overlay districts as appropriate f. Objective Design and Development Standards - The City is interested in creating a thorough set of design guidelines to govern the development of various uses including single-family residential, multiple-family residential, commercial, and mixed-use. The City expects this project to provide standards that will be consistent with the requirements for objective standards in compliance with Senate Bill (SB) 35 (Government Code Section February 21, 2023, Reg CC Mtg., Page #332

Page 8 of 12 ends

65913.4) and the Housing Accountability Act, as amended in 2019 by SB 330. Prepare illustrated community design standards and guidelines for single-family and multiplefamily residential, commercial, and mixed-use developments. Standards will reflect the variety of building types and architectural styles appropriate in the city and address topics such as, but not limited to:
i. site planning
ii. building massing and elements
iii. building frontages
iv. entrances
v. building materials
vi. landscaping
vii. site lighting, footcandle standards
viii. open space
ix. Electric Vehicle Charging Stations per AB 1236 and AB 970

8. Environmental Analysis
a. The Consultant shall prepare an Administrative Draft, Draft, and Final Environmental Impact Report (EIR) and conduct all public reviews in accordance with CEQA to create thorough and defensible CEQA documentation. In proposals, consultants should indicate whether use of a Program EIR or other form of EIR should be considered. The City is interested in exploring the possibility of a General Plan EIR that will assist in streamlining and exempting future projects from CEQA with the idea that the General Plan EIR can be used for such exemptions when projects are consistent with the General Plan. b. The Consultant shall be responsible for any and all procedural steps, including (but not limited to), the preparation of public notices, AB 52 & SB 18 Consultation, Notifications, Resolutions, Ordinances, Initial Study, Notice of Preparation, Notice of Completion, Notice of Determination, Filing Notices with County Offices, Filing Notices with the State Clearinghouse, providing notices to local and state agencies as needed, Statement of Overriding Considerations (if necessary), Facts and Findings and Responses to Comments.

The Consultant shall also be responsible for scheduling and conducting scoping meetings.

The scoping meeting shall include either meeting individually with or soliciting comments from all responsible, affected and trustee agencies in order to identify and discuss issues, actions, alternatives, potential and significant environmental effects and potential mitigation measures.
c. The Consultant will prepare technical support reports, appendices, including but not limited to traffic modeling, geotechnical, biological, air quality, noise, greenhouse gas emission reductions, and archeological reports. The City shall review and approve all documents prior to distribution by the Consultant. Policy and implementation programs shall be assessed for their impacts and mitigation measures shall be identified. The EIR shall reference pertinent analysis of the General Plan sufficient to allow for enactment of future development in the city. Cumulative and growth inducing impacts shall also be included in specific sections of the document; the EIR shall consider full “build-out” of the General Plan. A technical appendix clearly identifying all supporting documents shall be part of the EIR.
d. A Mitigation Measures and Monitoring Program shall be prepared pursuant to CEQA. This document shall be a separately bound document from the EIR. The Consultant shall develop recommended implementation measures appropriate for each element and also identify the appropriate party responsible for implementation, monitoring, capital costs and February 21, 2023, Reg CC Mtg., Page #333

Page 9 of 12 ends
← All documents from this meeting