CC ORD 2025-10
1726692.1
2. Factor that lead to spontaneous heating shall be identified in the plan, and control of the various factors shall be identified and implemented, including provisions for monitoring the internal condition of the pile.
3. The plan shall include means for early fire detection and reporting to the public fire department; and facilities needed by the fire department for fire extinguishment including a water supply and fire hydrants.
4. Fire apparatus access roads around the piles and access roads to the top of the piles shall be established, identified and maintained.
5. Regular yard inspections by trained personnel shall be included as part of an effective fire prevention maintenance program.
Additional fire protection called for in the plan shall be provided and shall be installed in accordance with this code. The increase of the pile size shall be based upon the capabilities of the installed fire protection system and features.
Section 2808.4 Pile separation is amended to read as follows:
2808.4. Pile separation. Piles shall be separated from adjacent piles by a minimum distance of 20 feet. Additionally, piles shall have a minimum separation of 100 feet from combustible vegetation.
Section 2808.7 Pile fire protection is amended to read as follows:
2808.7 Pile fire protection. Automatic sprinkler protection shall be provided in conveyor tunnels and combustible enclosures that pass under a pile.
Combustible conveyor systems and enclosed conveyor systems shall be equipped with an approved automatic sprinkler system. Oscillating sprinklers with a sufficient projectile reach are required to maintain a 40% to 60% moisture content and wet down burning/smoldering areas.
Section 2808.9 Material-handling equipment is amended to read as follows:
2808.9 Material-handling equipment. All material-handling equipment operated by an internal combustion engine shall be provided and maintained with an approved spark arrester. Approved material-handling equipment shall be available for moving wood chips, hogged material, wood fines and raw product during fire-fighting operations.
Section 2808.11 Temperature control is added to read as follows:
2808.11 Temperature control. The temperature shall be monitored and maintained as specified in Sections 2808.11.1 and 2808.11.2.
Section 2808.11.1 Pile temperature control is added to read as follows:
CC ORD 2025-10
1726692.1
2808.11.1 Pile temperature control. Piles shall be rotated when internal temperature readings are in excess of 165 degrees Fahrenheit.
Section 2808.11.2 New material temperature control is added to read as follows:
2808.11.2 New material temperature control. New loads delivered to the facility shall be inspected and tested at the facility entry prior to taking delivery.
Material with temperature exceeding 165 degrees Fahrenheit shall not be accepted on the site. New loads shall comply with the requirements of this chapter and be monitored to verify that the temperature remains stable.
Section 2808.12 Water availability is added to read as follows:
2808.12 Water availability. Facilities with over 2500 cubic feet shall provide a water supply. The minimum fire flow shall be no less than 500 GPM @ 20 psi for a minimum of 1 hour duration for pile heights up to 6 feet and 2 hour duration for pile heights over 6 feet. If there is no water purveyor, an alternate water supply with storage tank(s) shall be provided for fire suppression. The water supply tank(s) shall provide a minimum capacity of 2500 gallons per pile (maximum 30,000 gallons) for piles not exceeding 6 feet in height and 5000 gallons per pile (maximum 60,000) for piles exceeding 6 feet in height. Water tank(s) shall not be used for any other purpose unless the required fire flow is left in reserve within the tank at all times. An approved method shall be provided to maintain the required amount of water within the tank(s).
Section 2808.13 Tipping area is added to read as follows:
2808.13 Tipping areas shall comply with the following:
1. Tipping areas shall not exceed a maximum area of 50 feet by 50 feet.
2. Material within a tipping area shall not exceed 5 feet in height at any time.
3. Tipping areas shall be separated from all piles by a 20-foot-wide fire access lane.
4. A fire hydrant or approved fire water supply outlet shall be located within 150 feet of all points along the perimeter of the tipping area.
5. All material within a tipping area shall be processed within 5 days of receipt.
Section 2808.14 Emergency contact is added to read as follows:
2808.14 Emergency contact. The contact information of a responsible person or persons shall be provided to the Fire Department and shall be posted at the entrance to the facility for responding units. The responsible party should be available to respond to the business in emergency situation.
CC ORD 2025-10
1726692.1
Section 2808.15 Maximum grid of piles and rows is hereby added as follows:
2808.15 Maximum grid of piles and rows, Rows of Piles shall not exceed 500 feet by 500 feet. Grids shall be separated by a minimum 50-foot clear space used for no other purpose.
2808.16 Push-out / clear area is hereby added as follows:
2808.16 Push-out / clear area Piles exceeding 20 cubic yards shall be provided with push-out areas. Push-out areas shall be maintained clear at all times to allow for the largest pile to be spread out to a depth of 2 feet in height.
Push-out areas shall be located within 250 feet of all edges of any pile and shall be located a minimum of 20 feet from any building.
Chapter 29
Manufacture of Organic Coatings
Chapter 29 Manufacture of Organic Coatings is adopted in its entirety.
Chapter 30
Industrial Ovens
Chapter 30 Industrial Ovens is adopted in its entirety.
Chapter 31
Tents, Temporary Special Event Structures and Other Membrane Structures Chapter 31 Temporary Special Event Structures and Other Membrane Structures is adopted in its entirety as amended by SFM.
Chapter 32
High-Piled Combustible Storage
Chapter 32 High-Piled Combustible Storage is adopted in its entirety as amended by SFM.
Chapter 33
Fire Safety During Construction and Demolition
Chapter 33 Fire Safety During Construction and Demolition is adopted in its entirety.
Chapter 34
Tire Rebuilding and Tire Storage
Chapter 34 Tire Rebuilding and Tire Storage is adopted in its entirety as amended by SFM.
Chapter 35
Welding and Other Hot Work
CC ORD 2025-10
1726692.1
Chapter 35 Welding and Other Hot Work is adopted in its entirety.
Chapter 36
Marinas
Chapter 36 Marinas is adopted in its entirety.
Chapter 37
Combustible Fibers
Chapter 37 Combustible Fibers is adopted in its entirety.
Chapter 39
Processing and Extraction Facilities
Chapter 39 Processing and Extraction Facilities is adopted in its entirety.
Chapter 40
Storage of Distilled Spirits and Wines
Chapter 40 Storage of Distilled Spirits and Wines is adopted in its entirety.
Chapter 41
Temporary Heating and Cooking Operations
Chapter 41 TEMPORARY HEATING AND COOKING OPERATIONS is adopted in its entirely as amended by the SFM.
Chapter 48
Motion Picture and Television Production Studio Sound Stages, Approved Production Facilities and Production Locations
Chapter 48
Motion Picture and Television Production Studio Sound Stages, Approved Production Facilities and Production Locations is adopted in its entirety.
Chapter 49
Requirements for Wildland-Urban Interface Fire
Requirements for Wildland-Urban Interface Areas are now located in part 7 of Title 24, California Wildland-Urban Interface Code.
Chapter 50
Hazardous Materials – General Provisions
Chapter 50 Hazardous Materials – General Provisions is adopted in its entirety with the following amendments.
Section 5001.5.2 Hazardous Materials Inventory Statement (HMIS), is amended to read as follows:
CC ORD 2025-10
1726692.1
5001.5.2 Hazardous Materials Inventory Statement (HMIS). Where required by the fire code official, an application for a permit shall include. Orange County Fire Authority’s Chemical Classification Guideline, which shall be completed and approved prior to approval of plans, and/or the storage, use or handling of chemicals on the premises.
Section 5003.1.1.1 Extremely hazardous substances is added to read as follows:
5003.1.1.1 Extremely hazardous substances. No person shall use or store any amount of extremely hazardous substances (EHS) in excess of the disclosable amounts (see Health and Safety Code Section 25500 et al) in a residential zoned or any residentially developed property.
Chapter 51
Aerosols
Chapter 51 Aerosols is adopted in its entirety.
Chapter 53
Compressed Gases
Chapter 53 Compressed Gases is adopted in its entirety.
Chapter 54
Corrosive Materials
Chapter 54 Corrosive materials is adopted in its entirety as amended by SFM.
Chapter 55
Cryogenic Fluids
Chapter 55 Cryogenic Fluids is adopted in its entirety.
Chapter 56
Explosives and Fireworks
Chapter 56 Explosives and Fireworks is adopted in its entirety with the following amendments:
Section 5608.2 Firing is hereby added to read as follows:
5608.2 Firing. All fireworks displays, regardless of mortar, device, or shell size, shall be electrically fired.
Section 5608.3 Application for permit is added to read as follows:
Section 5608.3 Application for permit. A diagram of the grounds on which the display is to be held showing the point at which the fireworks are to be discharged, the fallout area based on 100 feet per inch of shell size, the location
CC ORD 2025-10
1726692.1
of all buildings, roads, and other means of transportation, the lines behind which the audience will be restrained, the location of all nearby trees, telegraph or telephone line, or other overhead obstructions shall be provided to OCFA.
Chapter 57
Flammable and Combustible Liquids
Chapter 57 Flammable and Combustible Liquids is adopted in its entirety as amended by SFM.
Chapter 58
Flammable Gases and Flammable Cryogenic Fluids
Chapter 58 Flammable Gases and Flammable Cryogenic Fluids is adopted in its entirety as amended by SFM.
Chapter 59
Flammable Solids
Chapter 59 Flammable Solids is adopted in its entirety.
Chapter 60
Highly Toxic and Toxic Materials
Chapter 60 Highly Toxic and Toxic Materials is adopted in its entirety.
Chapter 61
Liquefied Petroleum Gases
Chapter 61 Liquefied Petroleum Gases is adopted in its entirety.
Chapter 62
Organic Peroxides
Chapter 62 Organic Peroxides is adopted in its entirety.
Chapter 63
Oxidizers, Oxidizing Gases, and Oxidizing Cryogenic Fluids Chapter 63 Oxidizers, Oxidizing Gases, and Oxidizing Cryogenic Fluids is adopted in its entirety.
Chapter 64
Pyrophoric Materials
Chapter 64 Pyrophoric Materials is adopted in its entirety.
Chapter 65
Pyroxylin (Cellulose Nitrate) Plastics
Chapter 65 Pyroxylin (Cellulose Nitrate) Plastics is adopted in its entirety.
Chapter 66
Unstable (Reactive) Materials
Chapter 66 Unstable (Reactive) Materials is adopted in its entirety.
CC ORD 2025-10
1726692.1
Chapter 67
Water-Reactive Solids and Liquids
Chapter 67 Water-Reactive Solids and Liquids is adopted in its entirety.
Chapter 80
Referenced Standards
Chapter 80 Referenced Standards is adopted in its entirety with the following amendments:
NFPA 13, 2025 Edition, Standard for the Installation of Sprinkler Systems is amended as follows:
Section 9.2.1.7 is hereby revised as follows:
9.2.1.7 Concealed spaces filled with noncombustible insulation shall not require sprinkler protection when approved by the fire code official.
Section 9.4.3.1 is hereby revised as follows:
9.4.3.1 When fire sprinkler systems are installed in shell buildings of undetermined use (Spec Buildings) other than warehouses (S occupancies), fire sprinklers of the quick-response type shall be used. Use is considered undetermined if a specific tenant/occupant is not identified at the time the fire sprinkler plan is submitted. Sprinklers in light hazard occupancies shall be one of the following:
(1) Quick-response type as defined in 3.3.223.4.16
(2) Residential sprinklers in accordance with the requirements of Chapter 12 (3) Quick-response CMSA sprinklers
(4) ESFR sprinklers
(5) Standard-response sprinklers used for modifications or additions to existing light hazard systems equipped with standard-response sprinklers.
(6) Standard-response sprinklers used where individual standard-response sprinklers are replaced in existing light hazard systems
Section 16.12.3.3 is amended to read as follows:
16.12.3.3 Fire department connections (FDC) shall be of an approved type. The location shall be approved and be no more than 150 feet from a public hydrant.
The FDC may be located within 150 feet of a private fire hydrant when approved by the fire code official. The size of piping and the number of 2½” inlets shall be approved by the fire code official. If acceptable to the water authority, it may be installed on the backflow assembly. Fire department inlet connections shall be painted OSHA safety red or as approved. When the fire sprinkler density design requires more than 500 gpm (including inside hose stream demand), or a standpipe system is included, four 2½” inlets shall be provided.
CC ORD 2025-10
1726692.1
Section 9.4.3.1 is amended to read as follows:
9.4.3.1 When fire sprinkler systems are installed in shell buildings of undetermined use (Spec Buildings) other than warehouses (S occupancies), fire sprinklers of the quick-response type shall be used. Use is considered undetermined if a specific tenant/occupant is not identified at the time the fire sprinkler plan is submitted. Sprinklers in light hazard occupancies shall be one of the following:
(1) Quick-response type as defined in 3.6.4.8
(2) Residential sprinklers in accordance with the requirements of 8.4.5 (3) Quick response CMSA sprinklers
(4) ESFR sprinklers
(5) Standard-response sprinklers used for modifications or additions to existing light hazard systems equipped with standard-response sprinklers (6) Standard-response sprinklers used where individual standard-response sprinklers are replaced in existing light hazard systems Section 9.2.1.7is amended to read as follows:
9.2.1.7 Concealed spaces filled with noncombustible insulation shall not require sprinkler protection when approved by the fire code official.
CC ORD 2025-10
1726692.1
NFPA 13D 2025 Edition, Standard for the Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Homes is amended as follows:
Section 7.1.2 is amended to read as follows:
7.1.2 The sprinkler system piping shall not have separate control valves installed unless supervised by a central station, proprietary, or remote station alarm service.
NFPA 14, 2019 Edition, Installation of Standpipe and Hose Systems is amended as follows:
Section 7.3.1.1 is hereby deleted in its entirety.
NFPA 24, 2025 Edition, Standard for the Installation of Private Fire Service Mains and Their Appurtenances is amended as follows:
Section 6.2.8.1 is added to read as follows:
6.2.8.1 All indicating valves controlling fire suppression water supplies shall be painted OSHA red.
Exceptions:
1. Brass or bronze valves on sprinkler risers mounted to the exterior of the building may be left unpainted.
2. Where OS&Y valves on the detector check assembly are the only control valves, at least one OS&Y valve shall be painted red.
Section 6.2.9 is amended to read as follows:
6.2.9 All connections to private fire service mains for fire protection systems shall be arranged in accordance with one of the following so that they can be isolated:
(1) A post indicator valve installed not less than 40 ft (12 m) from the building
(a) For buildings less than 40 ft (12 m) in height, a post indicator valve shall be permitted to be installed closer than 40 ft (12 m) but at least as far from the building as the height of the wall facing the post indicator valve.
CC ORD 2025-10
1726692.1
(2) A wall post indicator valve on risers located within the building, either a nonrising stem gate valve with a wall post indicator or a listed butterfly value with an indicating handle extending out through the building.
(3) A backflow preventer with at least one indicating valve not less than 40 ft (12 m) from the building
(a) For buildings less than 40 ft (12 m) in height, a backflow preventer with at least one indicating valve shall be permitted to be installed closer than 40 ft (12 m) but at least as far from the building as the height of the wall facing the backflow preventer.
(4) Control valves installed in a fire-rated room accessible from the exterior (5) Control valves in a fire-rated stair enclosure accessible from the exterior Section 10.1.5 is added to read as follows:
10.1.5 All ferrous pipe and joints shall be polyethylene encased per AWWA C150, Method A, B, or C. All fittings shall be protected with a loose 8-mil polyethylene tube or sheet. The ends of the tube or sheet shall extend past the joint by a minimum of 12 inches and be sealed with 2 inch wide tape approved for underground use. Galvanizing does not meet the requirements of this section.
Exception: 304 or 316 Stainless Steel pipe and fittings Section 10.4.1.1 is amended to read as follows:
10.4.1.1 All bolted joint accessories shall be cleaned and thoroughly coated with asphalt or other corrosion-retarding material after installation.
Exception: Bolted joint accessories made from 304 or 316 stainless steel.
Section 10.4.1.1.1 is added to read as follows:
10.4.1.1.1 All bolts used in pipe-joint assembly shall be 316 stainless steel.
Section 10.4.3.2 is hereby deleted and replaced as follows:
10.4.3.2 Where fire service mains enter the building adjacent to the foundation, the pipe may run under a building to a maximum of 24 inches, as measured from the interior face of the exterior wall to the center of the vertical pipe. The pipe under the building or building foundation shall be 304 or 316 stainless steel and shall not contain mechanical joints or it shall comply with 10.4.3.2.1 through
10.4.3.2.4.
CC ORD 2025-10
1726692.1
Appendices
Appendix A is not adopted.
Appendix B is adopted in its entirety.
Appendix BB is adopted in its entirety.
Appendix C is adopted in its entirety.
Appendix CC is adopted in its entirety.
Appendix D is not adopted.
Appendix E is not adopted.
Appendix F is not adopted.
Appendix G is not adopted.
Appendix H is adopted in its entirety.
Appendix I is not adopted.
Appendix J is not adopted.
Appendix K is not adopted.
Appendix L is not adopted.
Appendix M is not adopted.
Appendix N is not adopted.
Appendix O is not adopted.
Appendix P is not adopted.
Appendix Q is not adopted.
SECTION 3. Filing with Building Standards Commission. The City Clerk shall file a certified copy of this Ordinance with the California Building Standards Commission.
SECTION 4. CEQA. In accordance with CEQA Guidelines section 15060(c)(2) – the adoption of the California Fire Code will not foreseeably result in direct or reasonably foreseeable indirect impacts and is exempt from the provisions of the California
CC ORD 2025-10
1726692.1
Environmental Quality Act and City Clerk shall file such Notice of Exemption with the County Clerk.
CC ORD 2025-10
1726692.1
SECTION 5. Severability. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held out to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have adopted this ordinance and each section, subsection, sentence, clause, phrase or portion thereof irrespective of the fact that any one or more sections, subsection, sentence clause, phrases or portions be declared valid or unconstitutional.
SECTION 6. Effective Date. This Ordinance shall not take effect until thirty (30) days after its final passage, or January 1, 2026, whichever occurs later.
SECTION 17.Publication by Clerk. The City Clerk shall certify as to the adoption of this Ordinance and shall cause a summary thereof to be published within fifteen (15) days of adoption and shall post a certified copy of this Ordinance, including the vote for and against same, in the Office of the City Clerk, in accordance with Government Code 36933.
PASSED, APPROVED AND ADOPTED this 17th day of November, 2025.
Shelley Hasselbrink, Mayor
ATTEST:
Windmera Quintanar, MMC, City Clerk
APPROVED AS TO FORM:
Michael S. Daudt, City Attorney
CC ORD 2025-10
1726692.1
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF LOS ALAMITOS )
I, Windmera Quintanar, MMC, City Clerk of the City of Los Alamitos, do hereby certify that the foregoing Ordinance No. 2025-10 was duly introduced and placed upon its first reading at a regular meeting of the City Council on the 13th day of October, 2025, and that thereafter, said Ordinance was duly adopted and passed at a regular meeting of the City Council on the 17th day of November, 2025, by the following vote, to wit:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
Windmera Quintanar, MMC, City Clerk
1726692.1
EXHIBIT A
LOCAL CONDITIONS FINDINGS
FACTUAL FINDINGS ESTABLISHING THE REASONABLE NEED FOR LOCAL
AMENDMENTS TO PORTIONS OF THE CALIFORNIA FIRE CODE BASED UPON LOCAL
CLIMATIC, GEOLOGICAL AND/OR TOPOGRAPHICAL CONDITIONS
The Fire Official and City Building Official recommend that certain changes and modifications to the 2025 California Fire Code are reasonably necessary due to local conditions within the City, certain changes and modifications are of an administrative or procedural nature or concern themselves with subjects not covered by the California Building Standards Code, and certain changes and modifications are reasonably necessary to safeguard life and property within the City of Los Alamitos.
Section 1. General Findings
The following findings apply in the City of Los Alamitos and explain why the changes to the Building Standards Code are necessary because of climatic, geological and/or topographical conditions in the city.
I. Climatic Conditions
A. Orange County is located in a semi-arid Mediterranean type climate. It annually experiences extended periods of high temperatures with little or no precipitation. Hot, dry (Santa Ana) winds, which may reach speeds of 70 M.P.H. or greater, are also common to the area. These climatic conditions cause extreme drying of vegetation and common building materials. Frequent periods of drought and low humidity add to the fire danger.
This predisposes the area to large destructive fires (conflagration). In addition to directly damaging or destroying buildings, these fires are also prone to disrupt utility services throughout the County. Obstacles generated by a strong wind, such as fallen trees, street lights and utility poles will greatly impact the response time to reach an incident scene.
B. The climate alternates between extended periods of drought and brief flooding conditions.
Flood conditions may affect the Orange County fire Authority’s ability to respond to a fire or emergency condition. Floods also disrupt utility services to buildings and facilities within the County.
C. Water demand in this densely populated area far exceeds the quantity supplied by natural precipitation; and although the population continues to grow, the already-taxed water supply does not. California is projected to increase in population by nearly 10 million over the next quarter of a century with 50 percent of that growth centered in Southern California. Due to storage capacities and consumption, and a limited amount of rainfall future water allocation is not fully dependable. This necessitates the need for additional and on-site fire protection features.
D. These dry climatic conditions and winds contribute to the rapid spread of even small fires originating in high-density housing or vegetation. These fires spread very quickly and create a need for increased levels of fire protection. The added protection of fire sprinkler systems and other fire protection features will supplement normal fire department
1726692.1
response by providing immediate protection for the building occupants and by containing and controlling the fire spread to the area of origin. Fire sprinkler systems will also reduce the use of water for firefighting by as much as 50 to 75 percent.
II. Topographical conditions
A. Natural; slopes of 15 percent or greater generally occur throughout the foothills of Orange County. The elevation change caused by the hills creates the geological foundation on which communities with Orange County is built and will continue to build. With much of the populated flatlands already built upon, future growth will occur on steeper slopes and with greater constraints in terrain.
B. Traffic and circulation congestion is an artificially created, obstructive topographical condition, which is common throughout Orange County.
C. These topographical conditions combine to create a situation that places fire department response time to fire occurrences at risk and makes it necessary to provide automatic onsite fire-extinguishing systems and other protection measures to protect occupants and property.
III. Geological Conditions
The Orange County region is a densely populated area that has buildings constructed over and near a vast and complex network of faults that are believed to be capable of producing future earthquakes similar or greater in size than the 1994 Northridge and the 1971 Sylmar earthquakes. Earthquake faults run along the northeast and southwest boundaries of Orange County. The Newport-Inglewood Fault, located within Orange County was the source of the destructive 1933 Long Beach earthquake (6.3 magnitude) which took 120 lives and damaged buildings in an area from Laguna Beach to Marina Del Rey to Whittier. In December 1989, another earthquake occurred in the jurisdiction of Irvine at an unknown fault line. Regional planning for reoccurrence of earthquakes is recommended by the state of California, Department of Conservation.
A. Previous earthquakes have been accompanied by disruption of traffic flow and fires. A severe seismic event has the potential to negatively impact any rescue or fire suppression activities because it is likely to create obstacles similar to those indicated under the high wind section above. The October 17, 1989, Santa Cruz earthquake resulted in one major fire in the Marina District (San Francisco). When combined with the 34 other fires locally and over 500 responses, the department was taxed to its fullest capabilities. The Marina fire was difficult to contain because mains supplying water to the district burst during the earthquake. This situation creates the need for both additional fire protection and automatic on-site fire protection for building occupants. State Department of Conservation noted in their 1988 report (Planning Scenario on a Major Earthquake on the Newport-Inglewood Fault Zone, page 59), “unfortunately, barely meeting the minimum earthquake standards of building codes places a building on the verge of being legally unsafe.”
1726692.1
B. Road circulation features located throughout the County also make amendments reasonably necessary. Located through the County are major roadways, highways and flood control channels that create barriers and slow response times. Hills, slopes, street and storm drain design, accompanied by occasional heavy rainfall, causes roadway flooding and landslides and at times may make an emergency access route impassable.
There are areas in Orange County that naturally have extended emergency response times that exceed the 5 minute goal.
C. Soils throughout the County possess corrosive properties that reduce the expected usable life of water services when metallic pipes are in contact with soils.
D. Portions of the County contain active or former oil production fields. These areas contain a variety of naturally occurring gasses, liquids and vapors. These compounds present toxicity or flammability hazards to building occupants. Evaluation of these hazards and the risks they pose to development is necessary for implementation of appropriate mitigation.
Due to the topographical conditions of sprawling development separated by waterways and narrow and congested streets and the expected infrastructure damage inherent in seismic zones described above, it is prudent to rely on automatic fire sprinkler systems to mitigate extended fire department response time and keep fires manageable with reduced fire flow (water) resources available for a given structure. Additional fire protection is also justified to match the current resources of firefighting equipment and personnel within the Orange County Fire Authority.
Section 2 –Application of Findings to Amendments in Ordinance No.
Amendments to the 2025 Edition of the California Fire Code set forth in Ordinance No. 2025-08 and identified below are reasonably necessary as administrative or procedural in nature, or to ensure consistency with previously adopted ordinances, or are intended to enhance life and fire safety due to the climatic, topographical, and/or geologic conditions cited below.
1726692.1
2025 California Fire Code
Amendment Findings Legend
CODE
SECTION
TITLE (Clarification) FINDINGS
113.4 Violation penalties Administrative
113.4.2 Infraction & Misdemeanor Administrative
202 General definitions Administrative
304.1.3 OCFA Vegetation Management I
305.6 Hazardous conditions I & II
305.7 Disposal of rubbish I & II
307 Open burning, recreational fires, fire pits, fire rings, and outdoor fireplaces
Administrative
307.6 Fire Pits, Fire Rings, & Outdoor Fireplaces Administrative 307.6.1 Gas-fueled devices I & II
307.6.2 Devices using wood or fuels other than natural gas or LPG
I & II
307.6.2.1 Where prohibited I & II
324 Fuel modification requirements for new construction I 325 Clearance of brush or vegetation growth from roadways I 326 Unusual circumstances Administrative
327 Use of equipment I
327.1 Use of equipment and devices generating heat, sparks or open flames
I
327.2 Spark arresters I
407.5 Hazardous material inventory statement I & II
501.1 Scope Administrative, I, II & III
510.1 Emergency responder radio coverage Administrative 903.2 Where required (Sprinklers) I, II & III
903.2.8 Group R (Sprinklers) I, II & III
903.3.5.3 Hydraulically calculated systems I & II
2801.2 Permit Administrative
2808.2 Storage site Administrative
2808.3 Size of piles I
2808.4 Pile separation I
2808.7 Pile fire protection I
2808.9 Material-handling equipment I
2808.11 Temperature control I
2808.11.1 Pile temperature control I
2808.11.2 New material temperature control I
2808.12 Water availability for piles I
2808.13 Tipping area I
2808.14 Emergency contact information Administrative
2808.15 Defining maximum separation contact Administrative 2808.16 Push-out area dentification Administrative
4903.3 OCFA Vegetation Management Guideline I
1726692.1
5001.5.2 Hazardous materials inventory statement Administrative 5003.1.1.1 Extremely hazardous substances I & III
5608.2 Retail fireworks Administrative
5608.3 Application for permit Administrative
Chapter
80 Reference Standards N/A
2025 NFPA 13 (Sprinkler Systems) Administrative, II & III 2025 NFPA 13-D (Single Family Sprinkler Systems) I & II 2019 NFPA 14 (Standpipe Systems) Administrative
2012 NFPA 24 (Underground Water Supply
Systems)
Administrative & III
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: November 17, 2025 ITEM NUMBER: 10G
To: Mayor Shelley Hasselbrink & Members of the City Council Presented By: Michael Daudt, City Attorney
Subject: Adopt Donation Box Zoning Code Changes
SUMMARY
At a public hearing on October 13, 2025, the City Council introduced the first reading of Ordinance Numbers 2025-11 and 2025-12. The Council item considered (1) Ordinance No. 2025-11, an amendment to Title 17 (Zoning) of the Los Alamitos Municipal Code concerning the regulation of thrift stores and donation boxes, front yard landscaping requirements, screening of mechanical equipment, and corrections of clerical errors and omissions to maintain internal consistency, and (2) Ordinance No. 2025-12, concerning the regulation of unattended donation boxes.
RECOMMENDATION
1. Adopt Ordinance No. 2025-11, entitled, "AN ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF LOS ALAMITOS, CALIFORNIA, AMENDING VARIOUS PROVISIONS OF TITLE 17 (ZONING) OF THE LOS ALAMITOS MUNICIPAL CODE CONCERNING THE
REGULATION OF THRIFT STORES AND DONATION BOXES, FRONT YARD
LANDSCAPING REQUIREMENTS, SCREENING OF MECHANICAL EQUIPMENT, AND TO
CORRECT CLERICAL ERRORS AND OMISSIONS TO MAINTAIN INTERNAL CONSISTENCY (ZOA 25-03) (CITY INITIATED)."; and,
1. Adopt Ordinance No. 2025-12, entitled, "AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOS ALAMITOS, CALIFORNIA, ADDING CHAPTER 5.54 TO TITLE 5 (BUSINESS LICENSES AND REGULATIONS) OF THE LOS ALAMITOS MUNICIPAL CODE CONCERNING THE REGULATION OF UNATTENDED DONATION BOXES."
BACKGROUND
The City Council most recently updated Title 17 of the Los Alamitos Municipal Code in November 2019. Since that time, staff has developed a list of desired code amendments.
These changes, included in proposed Ordinance No. 2025-11, are recommended to implement best practices and comply with recent developments in State Law. Proposed Ordinance No. 2025-12 would add new regulations to Title 5 of the Los Alamitos Municipal Code to impose reasonable regulations on the operation of donation boxes. On October 13, 2025, the City Council conducted a first reading of the proposed Ordinances. Tonight, these items, are recommended for City Council adoption.
DISCUSSION
Zoning Ordinance Amendment (ZOA) 25-03
Since the 2019 Zoning Code Update, Staff has kept an ongoing register of Zoning Code sections that need to be reinserted, revised, or clarified. The table below outlines those changes proposed for approval by the City Council. On August 27, 2025, the Planning Commission considered the zoning ordinance amendment at a duly noticed public hearing and recommended City Council approval of Ordinance No. 2025-11.
Recommended Zoning Code Changes
Change Suggested Los Alamitos Municipal
Code Section
Section in
Ordinance
The word “Live” is to be removed from required
plant materials.
Figure 2-01, of Section
17.08.040
3 Remove “Donation Boxes” and “Secondhand
Stores” from the list of Prohibited Uses.
Subsection G of Section
17.10.020 & 17.12.020
4 & 6
• To clarify, “Retail Sales-General” is a
permitted use in the P-L-I Zone when
fronting Katella Avenue, Los Alamitos
Blvd., and Cerritos Avenue.
• To allow “Donation Boxes” as a Permitted
Use.
• Add “Thrift Stores” as a
Permitted/Conditionally Permitted Use.
Table 2-04 (Allowed Uses
and Permit Requirements for
Commercial and Industrial
Zones) of Section 17.10.020
5 Make “Thrift Store” and “Donation Boxes”
permitted uses in the Town Center Mixed Use
(TCMU) Zone.
Section 17.12.030, Table 2-
06 7
• Screening exterior installed equipment
from Right-Of-Way (ROW) view.
• Exterior, structural-mounted conduits,
utility lines, pipes, and chase shall be
painted to match adjacent building and
wall surfaces.
Section 17.16.100 (Screening
and Buffering) of Chapter
17.16 8
Properly regulate thrift stores to meet California
Government Code Section 65630.
New Section 17.28.290 9
Delete “Consignment Store” from definitions Section17.74.030 10 Revise definition of Donation Box. Section 17.74.040 11 Remove references to “Consignment stores”
and “Secondhand stores” as a restricted retail
use.
Section 17.74.180 12
“Secondhand Store” definition to say see “Thrift
store” definition.
Section 17.74.190 13
Add “Thrift Store” definition. Section 17.74.200 14
Thrift Stores
As noted in the table above, the proposed zoning code amendment would make changes concerning the location of thrift stores. These changes are made in response to AB 2632, which was passed into law in 2024 and became effective January 1, 2025. This law prohibits cities “from classifying or otherwise treating thrift retail establishments differently than non-thrift retail establishments, subject to certain limitations” (Gov't Code section 65630(b)). The Los Alamitos Municipal Code (LAMC) currently defines secondhand stores as a "Personal Services, Restricted" use requiring a CUP in all commercial and industrial zoning districts.
Therefore, based on the guidance provided in State law, staff is recommending allowing thrift stores as a permitted uses, similar to other retail uses, and the addition of a new section to the LAMC which includes operational standards for thrift stores.
The addition of Section 17.28.290 (Thrift Stores) allows for regulations which are consistent with state law and reduce or eliminate secondary impacts related to the use. Government Code Section 65632(d) indicates that reasonable local rules related to the collection or receipt of used and donated items may be imposed. Accordingly, staff is recommending that thrift stores be allowed in the C-O, G-G, and P-L-I zones, subject to the following operational standards.
• The delivery and storage of goods or donations must be conducted entirely indoors. • Donations may only be accepted during business hours; no drop-off of donated goods may occur outside of business hours; thrift stores may not operate between 10:00 p.m. and 7:00 a.m.
• The donation process must be supervised and operated by employees of the thrift store.
• Any donated, discarded, or illegally dumped items left outside the building must be removed immediately.
• Signs and outdoor display must comply with Chapters 17.26 and Section 17.28.210 of the LAMC, respectively.
• Donation acceptance areas shall be clearly marked and must provide vehicular circulation which does not interfere with shopping center ingress, egress, or parking, and may not queue onto adjacent property or the public right-of-way.
• Equipment utilized in the collection, receipt, processing or disposal of used and donated goods is subject to the restrictions of Chapter 17.20 (Noise) and shall be operated in accordance with all applicable noise standards; noise generating equipment shall not be operated between 10:00 p.m. and 7:00 a.m. or on Sundays or Federal Holidays.
Title 5 Donation Box Regulations
A donation box is an unattended bin, box, container, storage shed, trailer, receptacle, or similar facility used for soliciting and collecting donations of clothing or other salvageable personal property. The zoning code amendment would also make changes concerning donation boxes.
Specifically, donation boxes would be added as a permitted use in the CO, C-G, P-L-I, and TCMU zoning districts, subject to the proposed Title 5 Donation Box Regulations. These changes stem from recent federal court decisions holding that a city may not prohibit these uses, but may impose reasonable content-neutral regulations on donation boxes. Therefore, staff is recommending the addition of chapter to Title 5 of the Los Alamitos Municipal Code concerning the regulation of donation boxes. Key provisions of the new chapter include, without limitation:
• It shall be unlawful to operate a donation box without first obtaining a city-issued permit. • Donation boxes may not be located within 1,000 feet of another donation box, or on the same parcel as a thrift store.
• Donation boxes may not block or impede vehicular or pedestrian traffic or obstruct required parking.
• Permit holders and property owners are each responsible for maintaining the donation box in good condition, secure, and free from graffiti.
• The area surrounding a donation box must be free and clear of litter. • Dumping of oversized items, E-waste, and hazardous waste is prohibited.
FISCAL IMPACT
None.
Attachment: 1. Ordinance No. 2025-11 - Zoning Code Amendment
2. Ordinance No. 2025-12 - Regulation of Unattended Donation Boxes
3. Planning Commission Resolution No. 25-04 - Recommendation of ZOA
4899-5020-1441, v. 1
ORDINANCE NO. 2025-11
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF LOS ALAMITOS, CALIFORNIA, AMENDING
VARIOUS PROVISIONS OF TITLE 17 (ZONING) OF THE
LOS ALAMITOS MUNICIPAL CODE CONCERNING THE
REGULATION OF THRIFT STORES AND DONATION
BOXES, FRONT YARD LANDSCAPING
REQUIREMENTS, SCREENING OF MECHANICAL
EQUIPMENT, AND TO CORRECT CLERICAL ERRORS
AND OMISSIONS TO MAINTAIN INTERNAL
CONSISTENCY (ZOA 25-03) (CITY INITIATED).
WHEREAS, the Development Services Director has initiated an amendment to Title 17 of the Los Alamitos Municipal Code (the “Code”) in accordance with Section
17.58.020 of the Code; and,
WHEREAS, in 2024, the California legislature approved, and the Governor signed into law Assembly Bill 2632 (AB 2632) which imposes new limitations on how local agencies may regulate thrift stores that sell secondhand or donated items; and, WHEREAS, Federal Courts have ruled that a total ban on charitable donation boxes violates First Amendment protections, but that local agencies may impose reasonable content-neutral regulations on such uses; and, WHEREAS, the City desires, among other things, to update the Code to comply with AB 2632 and Federal case law; and,
WHEREAS, additionally, the City desires to amend the Code to update front yard landscaping requirements and screening of mechanical equipment consistent with best practices: and,
WHEREAS, the Planning Commission opened a duly noticed Public Hearing concerning ZOA 25-03 on August 27, 2025, and recommended City Council approval of this Ordinance; and,
WHEREAS, the City Council opened a duly noticed Public Hearing concerning the proposed code amendment on October 13, 2025; and,
WHEREAS, the City Council considered all applicable staff reports and all public testimony and evidence presented at the Public Hearing.
THE CITY COUNCIL OF THE CITY OF LOS ALAMITOS, CALIFORNIA, DOES ORDAIN AS FOLLOWS:
SECTION 1. The foregoing recitals are true and correct and are incorporated
4899-5020-1441, v. 1
herein by reference.
SECTION 2. Pursuant to Section 17.58.060 of the Los Alamitos Municipal Code, the following findings are made in support of this code amendment:
a) This Ordinance ensures and maintains internal consistency with the actions, goals, objectives, and policies of the General Plan, and would not create any inconsistencies with the Zoning Code.
ZOA 25-03 does not conflict with any of the actions, goals, objectives, or policies of the General Plan and will not create any inconsistencies with the Zoning Code. This Ordinance corrects omissions, clerical errors, and adds provisions to clarify application of the City’s zoning regulations, consistent with the General Plan, to ensure uniform application and efficient administration of the Zoning Code.
b) This Ordinance will not be detrimental to the public convenience, health, interest, safety, or welfare of the City.
ZOA 25-03 will enhance the public convenience, health, interest, safety, and welfare of the City by creating an internally consistent Zoning Code, which will aid staff in its uniform application and efficient administration of the Zoning Code. ZOA 25-03 includes clarification of the locations where thrift stores and donation boxes are permitted. Thrift stores will be subject to operational standards, and this Ordinance anticipates City Council adoption of business licensing and regulatory standards for donation boxes.
Collectively, these provisions will ensure that these uses will not adversely affect surrounding properties or the surrounding environment. c) This Ordinance has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA) and the City’s environmental review procedures.
ZOA 25-03 is not subject to the California Environmental Quality Act (CEQA) pursuant to the California Code of Regulations, Title 14, Chapter 3, Sections 15060 (c) (2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) because it has no potential for resulting in physical change to the environment, directly or indirectly. Approval of Zoning Code Text Amendment CA 25-032 would not approve any development project or prompt any direct or indirect physical changes to the environment. d) The proposed amendment is internally consistent with other applicable provisions of this Zoning Code.
ZOA 25-03 is intended to ensure internal consistency within the Zoning Code.
4899-5020-1441, v. 1
SECTION 3. Figure 2-01, of Section 17.08.040 (R-1 Zone Front Yard Landscaping Requirement) of Division II (Zones, Allowable uses, and Development Regulations) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to remove the requirement for live plant material, to read as follows (deleted text in strikethrough):
Figure 2-01: Required Front Yard Landscaping
Minimum 50% of front yard setback
must contain live plant material
SECTION 4. Subsection G of Section 17.10.020 (Allowed Uses and Permit Requirements for Commercial and Industrial Zones) Chapter 17.10 (Commercial and Industrial Zones) of Division II (Zones, Allowable Uses, and Development Regulations) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to remove “Donation Boxes” and “Secondhand Stores” from the list of Prohibited Uses, to read as follows (deleted text in strikethrough; new text in underline):
G. Prohibited Uses. The following uses are specifically prohibited in all commercial and industrial zones:
1. All Cannabis Activities, including Cannabis Deliveries, Commercial Cannabis Activities, and Commercial Cultivation, even by Qualified Patients and Caregivers
2. Donation Boxes
4899-5020-1441, v. 1
2. Freight and/or Truck Terminals
3. Gun and Ammunition Stores
4. Manufacturing—Heavy
5. Recycling, Large Collection
6. Recycling, Processing Facility
7. Salvage Yard
9. Secondhand Stores
8. Swap Meets—Indoor or Outdoor
9. Tobacco and Vape Stores
SECTION 5. Table 2-04 (Allowed Uses and Permit Requirements for Commercial and Industrial Zones) of Section 17.10.020 (Allowed Uses and Permit Requirements for Commercial and Industrial Zones) of Chapter 17.10 (Commercial and Industrial Zones) of Division II (Zones, Allowable Uses, and Development Regulations) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to clarify “Retail Sales-General” is a Permitted Use in the P-L-I Zone when fronting specified street segments, to allow “Donation Boxes” as a Permitted Use, and add “Thrift Stores” as follows.
Permit Required by Zone
Use C-O C-G P-L-I Specific Use
Regulations
RETAIL USES
Retail Sales –
General
P P P/CUP Permitted Use in
the P-L-I zone for
storefronts facing
Katella Avenue,
Los Alamitos
Boulevard, and
Cerritos Avenue;
CUP required for
all other areas of
the P-L-I zone
Thrift Store P P P/CUP 1) Permitted Use
in the P-L-I
zone for
storefronts
facing Katella
Avenue, Los
Alamitos
Boulevard,
and Cerritos
Avenue; CUP
required for all
other areas of
the P-L-I zone
2) See Section
17.28.290
(Thrift Stores)
OTHER USES
Donation Boxes –
Outdoors
P P P See Chapter 5.54
(Regulation of
4899-5020-1441, v. 1
Unattended
Donation Boxes)
SECTION 6. Subsection G of Section 17.12.020 (Land Uses and Permit Requirements) Chapter 17.12 (Town Center Mixed-Use Zone) of Division II (Zones, Allowable Uses, and Development Regulations) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to remove “Donation Boxes” and “Secondhand Stores” from the list of Prohibited Uses, to read as follows (deleted text in strikethrough; new text in underline):
G. Prohibited Uses. The following uses are specifically prohibited in the TCMU zone:
SECTION 7. Table 2-06 (Allowed Uses and Permit Requirements for Town Center Mixed-Use Zone) of Section 17.12.030 (Commercial Uses Required Along Street Frontages) of Chapter 17.12 (Town Center Mixed-Use Zone) of Division II (Zones, Allowable Uses, and Development Regulations) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to allow “Donation Boxes” as a Permitted Use and add “Thrift Stores” as follows.
Permit Required by Zone
Land Use TCMU Specific Use Regulations
RETAIL SALES
Thrift Store P See Section 17.28.290 (Thrift Stores)
OTHER USES
Donation Boxes –
Outdoors
P See Chapter 5.54 (Regulation of
Unattended Donation Boxes)
SECTION 8. Section 17.16.100 (Screening and Buffering) of Chapter 17.16 (General Development Standards) of Division II (Zones, Allowable Uses, and Development Regulations) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended and restated to read as follows (deleted text in strikethrough; new text in underline):
1. All Cannabis Activities, including Cannabis Deliveries, Commercial Cannabis Activities, and Commercial Cultivation, even by Qualified Patients and Caregivers
2. Donation Boxes
2. Freight and/or Truck Terminals
3. Gun and Ammunition Stores
4. Manufacturing—Heavy
5. Recycling, Large Collection
6. Recycling, Processing Facility
7. Salvage Yard
9. Secondhand Stores
8. Swap Meets—Indoor or Outdoor
9. Tobacco and Vape Stores
4899-5020-1441, v. 1
§ 17.16.100 Screening and Buffering.
A. Purpose and Applicability. This section establishes standards for the screening and separation of residential from adjoining nonresidential land uses, equipment and outdoor storage areas, and surface parking areas from a rightof-way.
B. Mechanical Equipment, Loading Docks, and Refuse Areas.
1. Ground-mounted mechanical equipment (e.g., air conditioning, heating, ventilation ducts, and exhaust, etc.), loading docks, refuse storage areas, and utility facilities shall be screened from view from adjoining public rights-of-way and area(s) zoned for residential or open space uses by a minimum six-foothigh decorative masonry wall or structures.
2. The method of screening shall be architecturally compatible with other on-site development in terms of colors, materials, and architectural style.
3. Landscaping shall be installed adjacent to the walls, at the discretion of the Director, in compliance with Chapter 17.18 (Landscaping).
C. Drive-Through Facilities. Queuing aisles that abut a public right-of-way shall be screened from view from the right-of-way with a minimum three-foot-high landscaped hedge or combination wall and landscape screening.
D. Roof-mounted mechanical equipment (e.g., air conditioning condenser) on the roof shall be screened by architecturally compatible screening that is designed to the satisfaction of the Director.
E. Exterior, structural-mounted conduits, utility lines, pipes, and chase shall be painted to match adjacent building and wall surfaces.
SECTION 9. New Section 17.28.290 (Thrift Stores) is hereby added to Chapter
17.28 (Regulations for Specific Land Uses and Activities) of Division IV (Regulations for Specific Land Uses and Activities) of Title 17 (Zoning) of the Los Alamitos Municipal Code to read as follows:
§ 17.28.290 Thrift Stores.
A. Purpose. The purpose of this section is to comply with California Government Code Section 65630 et seq. to properly regulate thrift stores to ensure compatibility with surrounding land uses.
B. Standards. All thrift stores shall conform to the following standards:
4899-5020-1441, v. 1
1. The delivery and storage of goods or donations must be conducted entirely indoors.
2. Outdoor display of merchandise is regulated by Section 17.28.210 of this Title.
3. Donations may only be accepted during business hours; no drop-off of donated goods may occur outside of business hours. No thrift store shall operate between 10:00 p.m. and 7:00 a.m.
4. The donation process must be supervised and operated by employees of the thrift store.
5. Any donated, discarded, or illegally dumped items left outside the building must be removed immediately.
6. Donation acceptance areas shall be clearly marked and must provide vehicular circulation which does not interfere with shopping center ingress, egress, or parking, and may not queue onto adjacent property or the public right-of-way.
7. All signage, including temporary and directional signage is regulated by Chapter 17.26 of this Title.
8. Equipment utilized in the collection, receipt, processing or disposal of used and donated goods is subject to the restrictions of Chapter 17.20 (Noise) and shall be operated in accordance with all applicable noise standards; equipment shall not be operated between 10:00 p.m. and 7:00 a.m. or on Sundays or Federal Holidays.
SECTION 10. Section 17.74.030 (C Definitions) of Chapter 17.74 (Definitions) of Division VII (Definitions) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to delete the definition for “Consignment store” as follows (deleted text in strikethrough):
Consignment store. See “Secondhand Store.”
SECTION 11. Section 17.74.040 (D Definitions) of Chapter 17.74 (Definitions) of Division VII (Definitions) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended and restated in its entirety to read as follows:
Donation boxes. An unattended bin, box, container, storage shed, trailer, receptacle, or similar facility used for soliciting and collecting donations of clothing or other salvageable personal property.
SECTION 12. Section 17.74.180 (R Definitions) of Chapter 17.74 (Definitions) of Division VII (Definitions) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby
4899-5020-1441, v. 1
amended to remove references to “Consignment stores” and “Secondhand stores” as follows (deleted text in strikethrough; new text in underline):
Retail sales—general. The retail sale or rental of merchandise not specifically listed under another use classification. This classification includes department stores, clothing stores, furniture stores, pet supply stores, hardware stores, and businesses retailing the following goods: toys, hobby materials, handcrafted items, jewelry, cameras, photographic supplies and services (including portraiture and retail photo processing), medical supplies and equipment, pharmacies, electronic equipment, sporting goods, kitchen utensils, hardware, appliances, antiques, art galleries, art supplies and services, paint and wallpaper, carpeting and floor covering, office supplies, bicycles, and new automotive parts and accessories (excluding vehicle service and installation). Retail sales may be combined with other services such as office machine, computer, electronics, and similar smallitem repairs. Does not include swap meet, or pawn shop, or secondhand stores.
Retail sales—restricted. The retail sale of gun and ammunition stores, pawn shops, consignment stores, secondhand stores, and business offering payment for valuable goods such as jewelry and gold.
SECTION 13. Section 17.74.190 (S Definitions) of Chapter 17.74 (Definitions) of Division VII (Definitions) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended and restated in its entirety to read as follows:
Secondhand store. See “Thrift store.”
SECTION 14. Section 17.74.200 (T Definitions) of Chapter 17.74 (Definitions) of Division VII (Definitions) of Title 17 (Zoning) of the Los Alamitos Municipal Code is hereby amended to add the following definition to read as follows, to be placed in alphabetical order:
Thrift store. A retail store and related donation facilities engaged primarily in the sale of secondhand clothing, shoes, apparel, toys, and standard household goods, including furniture, fixtures, and small household appliances, and the collection of those goods for resale. “Thrift store” does not include the sale of large household appliances such as refrigerators or stoves and does not include the sale of cars or anything automotive-related.
SECTION 15. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Ordinance for any reason is held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have adopted this Ordinance, and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.
4899-5020-1441, v. 1
SECTION 16. The City Clerk shall certify as to the adoption of this Ordinance and shall cause a summary thereof to be published within fifteen (15) days of the adoption and shall post a Certified copy of this Ordinance, including the vote for and against the same, in the Office of the City Clerk, in accordance with Government Code Section 36933.
PASSED, APPROVED, AND ADOPTED this ___ day of _________, 2025.
Shelley Hasselbrink, Mayor
ATTEST:
______________________________
Windmera Quintanar, MMC, City Clerk
APPROVED AS TO FORM:
___________________________________
Michael S. Daudt, City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF LOS ALAMITOS )
I, Windmera Quintanar, MMC, City Clerk of the City of Los Alamitos, do hereby certify that the foregoing Ordinance No. 2025-11 was duly introduced and placed upon its first reading at a regular meeting of the City Council on the 13th day of October, 2025 and that thereafter, said Ordinance was duly adopted and passed at a regular meeting of the City Council on the ___ day of _________, 2025, by the following roll-call vote, to wit:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
Windmera Quintanar, MMC, City Clerk
4937-3025-5719, v. 1
ORDINANCE NO. 2025-12
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF LOS ALAMITOS, CALIFORNIA, ADDING CHAPTER
5.54 TO TITLE 5 (BUSINESS LICENSES AND
REGULATIONS) OF THE LOS ALAMITOS MUNICIPAL
CODE CONCERNING THE REGULATION OF
UNATTENDED DONATION BOXES
WHEREAS, a donation box is an unattended bin, box, container, storage shed, trailer, receptacle, or similar facility used for soliciting and collecting donations of clothing or other salvageable personal property; and,
WHEREAS, Title 17 (Zoning) of the Los Alamitos Municipal Code prohibits donation boxes citywide; and,
WHEREAS, federal courts have ruled that cities cannot prohibit charitable donation boxes in all zoning districts, but that local agencies may impose reasonable content-neutral regulations on such uses; and,
WHEREAS, concurrently with the adoption of this ordinance, the City Council is amending Title 17 (Zoning) of the Los Alamitos Municipal Code (“LAMC”) to permit donation boxes in the Town Center Mixed Use Zone and Commercial and Industrial Zones; and,
WHEREAS, the City Council desires to enact reasonable content-neutral business regulations governing the operation of donation boxes to preserve the public health, safety, and welfare and ensure that such uses do not result in nuisance conditions.
THE CITY COUNCIL OF THE CITY OF LOS ALAMITOS, CALIFORNIA, DOES ORDAIN AS FOLLOWS:
SECTION 1. The foregoing recitals are true and correct and are incorporated herein by reference.
SECTION 2. Chapter 5.54 is hereby added to Title 5 (Business Licenses and Regulations) of the Los Alamitos Municipal Code to read as follows:
Chapter 5.54 DONATION BOXES
§ 5.54.010 Definitions.
The following definitions shall apply to this Chapter. To the extent these definitions conflict with any other provision in the Municipal Code, these definitions shall control:
“City” means the city of Los Alamitos.
4937-3025-5719, v. 1
“City manager” means the city manager for the City of Los Alamitos or their designee. “Donation box” means an unattended bin, box, container, storage shed, trailer, receptacle, or similar facility used for soliciting and collecting donations of clothing or other salvageable personal property.
“Permittee” means the individual or organization that applies for a permit to place, operate, or maintain a donation box in the city, as provided for in this Chapter. “Person” means any individual, firm, partnership, joint venture, association, club, social club, fraternal organization, corporation, estate, trust, business trust, receiver, syndicate, or any other group or combination acting as a unit.
§ 5.54.020 Permit Required.
A. It is unlawful and a public nuisance for any property owner or other person to place, operate, maintain or allow donation boxes on real property unless: (1) the person placing the donation box first obtains a permit pursuant to this Chapter; and (2) the donation box is placed, operated and maintained in accordance with all provisions in this Chapter.
B. The permit application shall be made on a form provided by the city and shall include, without limitation, the following information:
1. The name, address, email, website (if available), and telephone number of the permittee;
2. Written proof sufficient to establish that the permittee is qualified to solicit donations of salvageable personal property pursuant to California Welfare and Institutions Code Section 148.3 as the same may be amended;
3. The text of disclosures that will be displayed on the donation box as required by Section 5.54.030(B);
4. The physical address of the real property where the donation box is proposed to be placed and a drawing sufficient to indicate the location of the donation box on the real property and the size and dimensions of the donation box;
5. If the permittee is not the real property owner, the application must include written approval from the property owner to operate a donation box at the property; and
6. A nonrefundable fee in the amount as may be established by resolution of the city council.
C. The city manager shall issue the permit following the receipt of a complete application and upon the city manager’s determination that the proposed operation
4937-3025-5719, v. 1
of the donation box will be in accordance with the requirements of this Chapter.
D. The city manager shall have the right for cause to revoke any permit issued pursuant to this Chapter. The failure of the permittee to comply with the provisions of this Chapter or other provisions of this code or other law shall also constitute grounds for revocation of permit. The city manager shall provide a written notification to the permittee stating the specific grounds for revocation. Upon revocation, the donation box shall be removed from the permittee's real property within 30 days and, if not removed within this time period, the city may remove, store and dispose of the donation box at the expense of the permittee. Upon revocation, a permittee shall be prohibited from applying for a permit for a period of one year. Any violation of the provisions of this Chapter is a public nuisance subject to abatement pursuant to Section 8.32 of this code.
§ 5.54.030 Location.
A. Donation boxes are prohibited from the following locations:
1. In or within 20 feet of the public-right-of-way;
2. Within 1,000 feet of another donation box;
3. Within five feet of any property line; or
4. On the same parcel as a thrift store, as defined by Section 17.74.200 of this code.
B. Donation boxes shall not block or impede access to:
1. Required parking or driveways;
2. Pedestrian routes;
3. Emergency vehicle routes;
4. Building ingress and egress;
5. Required handicapped accessibility routes;
6. Required easements; or
7. Trash enclosure areas or access to trash bins/trash enclosures.
C. No donation box shall be permitted if the placement of the donation box could constitute a safety hazard. Whether the location constitutes a safety hazard shall be determined by the city manager. Such hazards include, but are not limited to, the placement of a donation box within 1,000 feet of any place that stores large amounts of, or sells, fuel, or other flammable liquids or gases.
4937-3025-5719, v. 1
§ 5.54.030 Maintenance and aesthetics.
A. The permittee and property owner are each responsible for maintenance of donation boxes as follows:
1. Donation boxes shall be kept in good repair and the surrounding site shall be free of litter, debris, and overflow of materials;
2. Graffiti on the donation box must be removed within 24 hours;
3. Donation boxes shall be locked or otherwise secure; and
4. Donation boxes must be free of structural damage, holes, or visible rust.
B. All donation boxes must display, in a clear and easy-to-read manner, the following information:
1. Contact information, including the name, address, email, telephone number, and website, for the person or organization responsible for maintaining the donation box;
2. City of Los Alamitos business license number;
3. A statement indicating what materials are accepted and how the donated goods will be used, sold, dispersed, etc.; and
4. A statement indicating that donated items must fit in the donation box and that dumping is prohibited.
§ 5.54.040 Prohibited uses.
A. Donation boxes may not be used to collect any of the following:
1. Hazardous waste, as defined by Chapter 8.12.030 of this code;
2. Universal waste, as defined by Chapter 8.12.030 of this code, including batteries and electrical or electronic devices such as computers, televisions and smartphones;
3. Liquids;
4. Flammable material;
5. Large or broken furniture, mattresses, or large appliances, stoves, refrigerators etc.;
4937-3025-5719, v. 1
6. Solid waste, as defined by Section 17.74.190 and governed by Section 8.12 of this code; and
7. Plastic, glass, or organic material for recycling.
§ 5.54.050 Compliance.
A donation box that is in existence as of the effective date of this Chapter shall have one hundred twenty days to obtain a permit and thereafter comply with the provisions of this Chapter.
SECTION 3. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Ordinance for any reason is held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have adopted this Ordinance, and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.
SECTION 4. The City Clerk shall certify as to the adoption of this Ordinance and shall cause a summary thereof to be published within fifteen (15) days of the adoption and shall post a Certified copy of this Ordinance, including the vote for and against the same, in the Office of the City Clerk, in accordance with Government Code Section 36933.
PASSED, APPROVED, AND ADOPTED this _____ day of ________, 2025.
Shelley Hasselbrink, Mayor
ATTEST:
______________________________
Windmera Quintanar, MMC, City Clerk
APPROVED AS TO FORM:
___________________________________
Michael S. Daudt, City Attorney
4937-3025-5719, v. 1
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF LOS ALAMITOS )
I, Windmera Quintanar, MMC, City Clerk of the City of Los Alamitos, do hereby certify that the foregoing Ordinance No. 2025-12 was duly introduced and placed upon its first reading at a regular meeting of the City Council on the 13th day of October, 2025 and that thereafter, said Ordinance was duly adopted and passed at a regular meeting of the City Council on the _____ day of ____, 2025, by the following roll-call vote, to wit:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
______________________________
Windmera Quintanar, MMC, City Clerk
4928-8778-7105, v. 1
RESOLUTION NO. 2025-04
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF LOS ALAMITOS, CALIFORNIA, RECOMMENDING THE CITY
COUNCIL APPROVE ORDINANCE NO. 2025-03, AMENDING
VARIOUS PROVISIONS OF TITLE 17 (ZONING) OF THE LOS
ALAMITOS MUNICIPAL CODE CONCERNING THE
REGULATION OF THRIFT STORES AND DONATION BOXES,
FRONT YARD LANDSCAPING REQUIREMENTS, SCREENING
OF MECHANICAL EQUIPMENT, AND TO CORRECT CLERICAL
ERRORS AND OMISSIONS TO MAINTAIN INTERNAL
CONSISTENCY (ZOA 25-03) (CITY INITIATED).
WHEREAS, the Development Services Director has initiated an amendment to Title 17 of the Los Alamitos Municipal Code (the “Code”) in accordance with Section 17.58.020 of the Code; and,
WHEREAS, in 2024, the California legislature approved, and the Governor signed into law Assembly Bill 2632 (AB 2632) which imposes new limitations on how local agencies may regulate thrift stores that sell secondhand or donated items; and,
WHEREAS, Federal Courts have ruled that a total ban on charitable donation boxes violates First Amendment protections, but that local agencies may impose reasonable content-neutral regulations on such uses; and, WHEREAS, the City desires, among other things, to update the Code to comply with AB 2632 and Federal case law; and,
WHEREAS, additionally, the City desires to amend the Code to update front yard landscaping requirements and screening of mechanical equipment consistent with best practices; and,
WHEREAS, on August 27, 2025, the Planning Commission opened a duly noticed Public Hearing concerning ZOA 25-03 and considered public comments and the written and oral information and testimony presented by City staff, community residents, and other interested parties, and recommended that the City Council approve and adopt ZOA 25-03.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
LOS ALAMITOS DOES RESOLVE AS FOLLOWS:
SECTION 1. The Planning Commission finds that the above recitals are true and correct.
Docusign Envelope ID: C9396E91-BF31-4893-B594-3D61EA053D43
4928-8778-7105, v. 1
SECTION 2. The Planning Commission hereby recommends that the City Council adopt Ordinance No. 25-03 based on the following findings, as specified in Section 17.58.060 of the Los Alamitos Municipal Code:
a) This Ordinance ensures and maintains internal consistency with the actions, goals, objectives, and policies of the General Plan, and would not create any inconsistencies with the Zoning Code.
ZOA 25-03 does not conflict with any of the actions, goals, objectives, or policies of the General Plan and will not create any inconsistencies with the Zoning Code. This Ordinance corrects omissions, clerical errors, and adds provisions to clarify application of the City’s zoning regulations, consistent with the General Plan, to ensure uniform application and efficient administration of the Zoning Code.
b) This Ordinance will not be detrimental to the public convenience, health, interest, safety, or welfare of the City.
ZOA 25-03 will enhance the public convenience, health, interest, safety, and welfare of the City by creating an internally consistent Zoning Code, which will aid staff in its uniform application and efficient administration of the Zoning Code. ZOA 25-03 includes clarification of the locations where thrift stores and donation boxes are permitted. Thrift stores will be subject to operational standards, and this Ordinance anticipates City Council adoption of business licensing and regulatory standards for donation boxes. Collectively, these provisions will ensure that these uses will not adversely affect surrounding properties or the surrounding environment.
c) This Ordinance has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA) and the City’s environmental review procedures.
ZOA 25-03 is not subject to the California Environmental Quality Act (CEQA) pursuant to the California Code of Regulations, Title 14, Chapter 3, Sections 15060 (c) (2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) because it has no potential for resulting in physical change to the environment, directly or indirectly. Approval of Zoning Code Text Amendment CA 25-032 would not approve any development project or prompt any direct or indirect physical changes to the environment. d) The proposed amendment is internally consistent with other applicable provisions of this Zoning Code.
Docusign Envelope ID: C9396E91-BF31-4893-B594-3D61EA053D43
4928-8778-7105, v. 1
ZOA 25-03 is intended to ensure internal consistency within the Zoning Code.
SECTION 3. The Secretary of the Planning Commission shall certify as to the adoption of this Resolution.
PASSED, APPROVED, AND ADOPTED this 27th day of August 2025. ________________________________
Mary Anne Cuilty, Chair
ATTEST:
______________________________
Gabriela Martinez, Secretary
APPROVED AS TO FORM:
_______________________________
Michael S. Daudt, City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF LOS ALAMITOS )
I, Gabriela Martinez, Planning Commission Secretary of the City of Los Alamitos, do hereby certify that the foregoing Resolution was adopted at a regular meeting of the Planning Commission held on the 27th day of August 2025, by the following vote, to wit:
AYES: COMMISSIONERS:Cuilty, Griego, Heichman, Hastie, Legere NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
________________________________________
Gabriela Martinez, Secretary
Docusign Envelope ID: C9396E91-BF31-4893-B594-3D61EA053D43
4928-8778-7105, v. 1
Docusign Envelope ID: C9396E91-BF31-4893-B594-3D61EA053D43
4928-8778-7105, v. 1
Attachment “A”
Ordinance No. 2025-03
Docusign Envelope ID: C9396E91-BF31-4893-B594-3D61EA053D43
City of Los Alamitos
CITY COUNCIL AGENDA REPORT
MEETING DATE: November 17, 2025 ITEM NUMBER: 10H
To: Mayor Shelley Hasselbrink & Members of the City Council Presented By: Ron Noda, Assistant City Manager/Development Services Director Chris Kelley, City Engineer
Subject: Approval of Plans and Specifications for Oak Street Improvement Project (CIP 24/25-03)
SUMMARY
This item recommends City Council approval of the Oak Street Improvement Project (CIP 24/25-03) plans and specifications and authorization to facilitate the solicitation of bids. The Project will include a grind and overlay of Oak Street from Katella Avenue to Sausalito Street.
RECOMMENDATION
1. Approve the plans and specifications for the Oak Street Improvement Project (CIP 24/25- 03); and,
2. Authorize Staff to advertise and solicit bid proposals.
BACKGROUND
The City of Los Alamitos Capital Improvement Program recommends grind and overlay street improvements of various residential streets throughout the City, as part of the City’s ongoing pavement management program. The Oak Street Improvement Project is one such project.
Street improvement projects are vital to maintaining the City’s infrastructure, ensuring safe and reliable travel for residents, businesses, and emergency services. Proactive pavement maintenance extends the lifespan of roadways, reduces long-term repair costs, enhances neighborhood aesthetics, and supports overall community mobility and quality of life.
DISCUSSION
The Oak Street Improvement Project will include a grind and overlay, and will also replace damaged curb and gutter, and lifted sidewalk to correct drainage. Americans with Disabilites Act (AD) curb ramps will be modified to current codes as necessary for accessibility. The Project limits are from Katella Avenue to Sausalito Street. The Project is next to Oak Middle School and staff will minimize the impact to the School as much as possible.
The estimated Project costs are as follows:
Design, Plans and Specifications $35,495
Construction $507,970
Construction Contingency $50,800
Labor Compliance $6,000
Construction Inspection & Management $50,000
Project Total Budget $650,265
The following is an approximate timeline for the completion of the street improvement project:
• 11/17/2025 Approval of plans & specifications by the City Council • 11/20/2025 Advertise project
• 12/11/2025 Bid opening
• 01/19/2026 Award of Contract (City Council Meeting)
• 02/16/2026 Start of construction
• 04/13/2026 End of construction
FISCAL IMPACT
Funding for this project was included in the Fiscal Year 2024-2025 Capital Improvement Program (CIP) adopted budget and funding was carried over to Fiscal Year 2025-2026. Project funding includes the following:
Budget Fiscal Year Source Amount
2024-25 Gas Tax $341,217
2024-25 SB-1 $310,410
Project Total $651,627
Attachment: 1. Oak Street Improvement Project (CIP 24/25-03) - Plans
2. Oak Street Improvement Project (CIP 24/25-03) - Specifications
R E V I S I O N S R E F E R E N C E S 2401 East Katella Ave, Suite 450, Anaheim, California 92806 714/978-8200 fax 714/978-8299 USER: LAvila
FILE: W:\WE-CA\Los Alamitos, City of\113599 - Los Al 2024-25 SB1 Project\900-PS&E\901-Plans\PL-TITL.dwg DATE: Oct 28, 2025 - 11:45am Know what'sbelow. Callbefore you dig. R BID SET UTILITY CONTACTS: AGENCIES TO BE NOTIFIED: SIGNING AND STRIPING GENERAL NOTES: GENERAL NOTES: ABBREVIATIONS SHEET INDEX VICINITY MAP Chris Kelly, PE, City Engineer
CONSTRUCTION NOTES:
LEGEND
A A
R E V I S I O N S R E F E R E N C E S
2401 East Katella Ave, Suite 450, Anaheim, California 92806 714/978-8200 fax 714/978-8299 USER: LAvila FILE: W:\WE-CA\Los Alamitos, City of\113599 - Los Al 2024-25 SB1 Project\900-PS&E\901-Plans\PL-DETL.dwg DATE: Oct 28, 2025 - 11:50am Know what'sbelow.
Callbefore you dig.
R BID SET
DETAIL "3"
SAWCUT AT LOCAL DEPRESSION
DETAIL "4"
SLOT PAVEMENT
DETAIL "1"
SOUTH DRIVEWAY AT OAK MIDDLE SCHOOL
DETAIL "2"
NORTH DRIVEWAY AT OAK MIDDLE SCHOOL
SECTION A-A
Chris Kelly, PE, City Engineer Page 187 of 407
CONSTRUCTION NOTES:
LEGEND
R E V I S I O N S R E F E R E N C E S
2401 East Katella Ave, Suite 450, Anaheim, California 92806 714/978-8200 fax 714/978-8299 USER: LAvila FILE: W:\WE-CA\Los Alamitos, City of\113599 - Los Al 2024-25 SB1 Project\900-PS&E\901-Plans\PL-DETL 2.dwg DATE: Oct 28, 2025 - 11:51am Know what'sbelow.
Callbefore you dig. R BID SET
TYPICAL SECTION
OAK ST BB
DETAIL "5"
V-GUTTER
SECTION B-B
Chris Kelly, PE, City Engineer Page 188 of 407
CONSTRUCTION NOTES:
LEGEND
R E V I S I O N S R E F E R E N C E S
2401 East Katella Ave, Suite 450, Anaheim, California 92806 714/978-8200 fax 714/978-8299 USER: LAvila FILE: W:\WE-CA\Los Alamitos, City of\113599 - Los Al 2024-25 SB1 Project\900-PS&E\901-Plans\PL-ROAD-01.dwg DATE: Oct 28, 2025 - 11:53am Know what'sbelow.
Callbefore you dig. R BID SET MATCHLINE STA 18+25 SEE BELOW LEFT MATCH LINE STA 18+25 SEE ABOVE RIGHT Chris Kelly, PE, City Engineer Page 189 of 407 STRIPING CONSTRUCTION NOTES:
LEGEND
OAK ST
KATELLA AVE
FLORISTA ST
KATELLA AVE
R E V I S I O N S R E F E R E N C E S
2401 East Katella Ave, Suite 450, Anaheim, California 92806 714/978-8200 fax 714/978-8299 USER: LAvila FILE: W:\WE-CA\Los Alamitos, City of\113599 - Los Al 2024-25 SB1 Project\900-PS&E\901-Plans\PL-STRIPE-01.dwg DATE: Oct 28, 2025 - 2:40pm Know what'sbelow.
Callbefore you dig. R BID SET
OAK ST CATALINA ST
OAK ST
SAUSALITO ST
Chris Kelly, PE, City Engineer Page 190 of 407
CITY OF LOS ALAMITOS
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
OAK STREET IMPROVEMENTS PROJECT
CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
DECEMBER 2025
NOTICE TO THE BIDDERS:
1. Bids will be received electronically through BidNet Direct (http://cityoflosalamitos.org/517/Bid-Opportunities).
2. Bid bond required – 10% of bid amount to be submitted to the Development Services Department.
3. Bids must be received by 11:00 a.m. on December 11th, 2025
This page is intentionally left blank.
CITY OF LOS ALAMITOS
SPECIFICATIONS FOR
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
GENERAL REQUIREMENTS AND TECHNICAL PROVISIONS
PREPARED BY:
Willdan Engineering
2401 East Katella Avenue, Suite 300
Anaheim, CA 92806
(714) 978-8200
Camryn Lopez, P.E. Date
Associate Engineer
FOR THE CITY OF LOS ALAMITOS
PUBLIC WORKS DIVISION
DEVELOPMENT SERVICES DEPARTMENT
10/29/2025
This page is intentionally left blank.
TABLE OF CONTENTS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
SECTION
NOTICE INVITING ELECTRONIC BIDS ................................................................................................ A INSTRUCTIONS TO BIDDERS .................................................................................................................B PROPOSAL INFORMATION AND DOCUMENTS..................................................................................C CONTRACT INFORMATION AND DOCUMENTS................................................................................ D STANDARD SPECIFICATIONS ................................................................................................................E SPECIAL PROVISIONS..............................................................................................................................F SPECIAL PROVISIONS – SIGNING, STRIPING AND PAVEMENT MARKERS................................ G STANDARD PLANS ................................................................................................ APPENDIX – PART 1
This page is intentionally left blank.
SPC25-11 A-1
SECTION A
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
NOTICE INVITING ELECTRONIC BIDS
SPC25-11 A-2
This page is intentionally left blank.
SPC25-11 A-3
NOTICE INVITING ELECTRONIC BIDS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
PUBLIC NOTICE IS HEREBY GIVEN that the City of Los Alamitos as AGENCY, invites electronic bids for the above stated project and will receive such bids electronically through BidNet Direct (http://cityoflosalamitos.org/517/Bid-Opportunities). Bids will be received up to the hour of 11:00 a.m., on December 11th, 2025 and will be opened virtually at that time.
The City of Los Alamitos proposes to grind and overlay one residential street within the City as part of the City’s ongoing pavement management program. The project will also replace damaged curb & gutter and lifted sidewalk to correct drainage. ADA curb ramps will be modified to current codes as necessary for accessibility. The project includes the following streets:
• Oak Street from Katella Ave to Sausalito St
Bids must be prepared on the approved bid forms in conformance with INSTRUCTIONS TO BIDDERS and must be submitted electronically on BidNet Direct (BidNet), accessible through the Agency’s webpage at http://cityoflosalamitos.org/517/Bid-Opportunities where each prospective bidder must first register as a vendor through the Agency’s BidNet portal. No hard copy bid packages will be accepted.
Plans, and specifications will be available for review on BidNet. All relevant materials shall be obtained from the link above. The Agency is not responsible for and accepts no liability in the event a response is late due to any network, internet or any other technical problem or interruption. The bidder is solely responsible for the “on time” submission of their electronic bid. The Agency will only consider bids that have been transmitted successfully and have been issued an e-bid confirmation number. Bidders experiencing any technical difficulties with the bid submission process may contact BidNet at (800)835- 4603.
In accordance with the provisions of California Public Contract Code § 3300, and Business and Professions Code § 7028.15(e), the Agency has determined that the contractor shall possess a valid Class A contractor’s license at the time that the contract is awarded. Failure to possess the specified license shall render a bidder’s bid as non-responsive and shall bar award of the contract to any bidder not possessing the specified license at the time of the award.
CONTRACTORS ARE REQUIRED BY LAW TO BE LICENSED AND REGULATED BY THE CONTRACTORS’ STATE LICENSE BOARD. ANY QUESTIONS CONCERNING A CONTRACTOR MAY BE REFERRED TO THE REGISTRAR, CONTRACTORS’ STATE LICENSE BOARD, P.O. BOX 2600, SACRAMENTO, CA 95826. At the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of this state. The first payment for work or material shall not be made unless and until the Registrar of Contractors verifies to the Agency that the records of the Contractors’ State License Board indicate that the contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractors’ State Board. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. (Public Contract Code § 20103.5)
SPC25-11 A-4
REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, or engage in the performance of any contract for public work, unless currently registered with the Department of Industrial Relations.
THE BID MUST BE ACCOMPANIED BY A BID GUARANTEE IN THE AMOUNT OF 10% OF
THE TOTAL BID PRIOR TO THE BID SUBMISSION DEADLINE, SUBMITTED TO THE FINANCE DEPARTMENT, ATTN: FINANCE MANAGER, 3191 KATELLA AVENUE, LOS ALAMITOS, CA 90720. Sealed envelopes bearing the bid bond should be clearly marked with the project title and CIP number as shown on the cover sheet of these specifications. More specifically, pursuant to Public Contract Code §§ 20170 and 20171, all bids for the project shall be presented, under sealed cover and shall be accompanied by one of the following forms of bidder’s security in the amount of ten percent (10%) of the bid: (a) cash; (b) a cashier’s check made payable to the City of Los Alamitos; (c) a certified check made payable to the City of Los Alamitos; or (d) a bidder’s bond executed by an admitted surety insurer made payable to the City of Los Alamitos. Such security shall be forfeited should the successful bidder to whom the contract is awarded fails to timely execute the contract and to deliver the necessary bonds and insurance certificates as specified in the contract documents.
To the extent applicable, at any time during the term of the Agreement for the proposed project, the successful bidder may, at its own expense, substitute securities equivalent to the amount withheld as retention (or the retained percentage) in accordance with Public Contract Code § 22300.
Pursuant to California Civil Code § 3247, a payment bond is required to be submitted for all projects estimated in excess of $25,000.00.
The Agency has determined that the proposed project is a public works subject to the provisions of Labor Code § 1720 thereby requiring the Contractor to pay the prevailing wage rates for all work performed under the Contract.
Questions or Requests for Information (RFIs) or interpretations are due December 1 st
, 2025, at 11:00 a.m.,
ten (10) days before the time announced for the opening of the bids and shall be submitted on the BidNet portal. If you have any questions, please contact Vandine Ouk at (562)431-3538 ext. 301 or [email protected].
BY ORDER OF the City Council of the City of Los Alamitos, California.
SPC25-11 B-1
SECTION B
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
INSTRUCTIONS TO BIDDERS
SPC25-11 B-2
INSTRUCTIONS TO BIDDERS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
B1.01 INSPECTION OF SITE OF WORK
Bidders are required to inspect the site of the work in order to satisfy themselves, by personal examination or by such other means as they may prefer, of the location of the proposed work and as to the actual conditions of and at the site of work. If, during the course of his/her examination, a bidder finds facts or conditions which appear to him/her to conflict with the letter or spirit of the contract documents, or with any other data furnished him/her, he/she may apply to the Agency in writing in accordance with B1.04 INTERPRETATION OF CONTRACT DOCUMENTS for additional information and explanation before submitting his/her bid.
The submission of a proposal by the bidder shall constitute the acknowledgment that, if awarded the contract, he/she has relied and is relying on his/her own examination of (a) the site of the work, (b) the access to the site, and (c) all other data, matters, and things requisite to the fulfillment of the work and on his/her own knowledge of existing services and utilities on and in the vicinity of the site of the work to be constructed under the contract, and not on any representation or warranty of the Agency. No claim for additional compensation will be allowed which is based upon a lack of knowledge of these items.
B1.02 EXAMINATION OF CONTRACT DOCUMENTS
Each bidder shall thoroughly examine and be familiar with legal and procedural documents, general conditions, specifications, drawings and addenda (if any). The submission of a proposal shall constitute an acknowledgment upon which the Agency may rely that the bidder has thoroughly examined and is familiar with the contract documents. The bidders’ attention is directed to the need, if any, for special invoicing for this project. The failure or neglect of a bidder to receive or examine any of the contract documents shall in no way relieve him/her from any obligations with respect to his/her proposal or to the contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any contract document.
B1.03 CONTRACT PERIOD/CONSTRUCTION COMPLETION DATE
Bidder’s attention is called to the provisions set forth in SECTION E, STANDARD SPECIFICATIONS, particularly those pertaining to the contract period and liquidated damages for avoidable delays.
Due to proximity to Oak Middle School all grinding & AC paving operations shall be scheduled in accordance with the following options:
- Friday or Saturday
- Week of February 16th – 20th
- Week of April 6th – 10th
The Contractor shall begin work as of the date of the Notice to Proceed, and shall diligently prosecute said work to completion before the expiration 25 WORKING DAYS. The Contractor shall pay to the Agency the sum of $1000.00 per day, for each and every calendar day’s delay in finishing the work in excess of the number of working days prescribed above.
B1.04 INTERPRETATION OF CONTRACT DOCUMENTS
No oral interpretations will be made to any bidder as to the meaning of the contract documents. Requests for an interpretation shall be made in writing and delivered to the Agency at least ten (10) days before the time announced for opening the proposals. Interpretations by the Agency will be in the form of addenda to the contract documents and, when issued, will be sent as promptly as is practical to all parties to whom the contract documents have been issued. Agency makes no guarantee that all bidders will receive all addenda. Copies of addenda will be made available for inspection at the office where contract documents are on file for inspection as indicated on
SPC25-11 B-3
the Invitation for Bids. All such addenda shall become part of the contract. All questions shall be addressed to Chris Kelley, City of Los Alamitos, (562) 357-5411.
B1.05 SOIL INFORMATION
Soil reports have not been prepared for this project.
B1.06 PROPOSAL
Proposals shall be made on the forms enclosed in SECTION C of these specifications with or without removal from the bound contract documents. All proposals shall give the prices proposed, both in words and in numbers, shall give all other information requested herein, and shall be signed by the bidder or his/her authorized representative, with his/her address. If the proposal is made by an individual, his/her name, signature and mailing address must be shown; if made by firm or partnership, the name and mailing address of the firm or partnership and the signature of at least one of the general partners must be shown; if made by a corporation, the proposal shall show the name of the state under the laws of which the corporation is chartered, the name and mailing address of the corporation, and the name and title of the person who signs on behalf of the corporation. If the proposal is made by a corporation, a certified copy of the bylaws or resolution of the board of directors of the corporation shall be furnished demonstrating the authority of the officer signing the proposal to execute contracts on behalf of the corporation.
Each proposal shall be submitted as specified in SECTION A - NOTICE INVITING ELECTRONIC BIDS.
Bidders are warned against making erasures or alterations of any kind, and proposals which contain omissions, erasures or irregularities of any kind may be rejected. No oral, telegraphic or telephonic proposals or modifications will be considered.
In conformance with the Business and Profession Code, § 7028.15, the Contractor must state clearly his/her license number and expiration date. In addition he/she shall sign a statement that these representations were made under the penalty of perjury. This statement shall be made on the EXPERIENCE STATEMENT in SECTION C.
The contractor will be required to pay prevailing wage pursuant to California Law, including California Labor Code §§ 1770 et seq. Copies of the prevailing rate of per diem wages are on file at the offices of the Agency.
B1.07 ADDENDA
Each proposal shall include specific acknowledgment in the space provided on SECTION C - BID PROPOSAL of receipt of all addenda issued during the bidding period. Failure to so acknowledge may result in the proposal being rejected as not responsive.
B1.08 BID PRICES
Bid prices shall include everything necessary for the completion of construction and fulfillment of the contract including, but not limited to, furnishing all materials, equipment, tools, plant and other facilities and all management, superintendence, labor and services, except as may be provided otherwise in the contract documents. In the event of a difference between a price quoted in words and a price quoted in numbers for the same quotation, the words shall be the amount bid.
In preparing bid prices, bidder represents that he/she has carefully examined the Contract Documents and the site where the work is to be performed and that he/she has familiarized himself with all local conditions and federal, state and local laws, ordinances, rules, and regulations that may affect the performance of the work in any manner.
The bidder further represents that he/she has studied all surveys and investigation reports about subsurface and physical conditions pertaining to the job site, that he/she has performed such additional surveys and investigations as he/she deems necessary to complete the work at his/her bid price, and that he/she has correlated the results of all such data with the requirements of the Contract Documents. The submittal of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, including locality,
SPC25-11 B-4
uncertainty of weather and all other contingencies, and as to the character, quality, quantities, and scope of the work.
The plans and specifications for the work show subsurface conditions or otherwise hidden conditions as the Design Engineer supposes or believes them to exist, but is not intended or to be inferred that the conditions as shown thereon constitute a representation that such conditions are actually existent. Except as otherwise specifically provided in the Contract Documents, the Agency, the Design Engineer and their consultants or agents shall not be liable for any loss sustained by the Contractor as a result of any variance of such conditions as shown on the plans and the actual conditions revealed during the progress of the work or otherwise.
The Contractor shall perform an independent take-off of the plans and bid accordingly. Quantities listed in the BID SCHEDULE in SECTION C are intended only as a guide for the Contractor as to the anticipated order of magnitude of work. Contractor shall be responsible for verifying all estimated quantities. Contractor will be reimbursed for the quantity of items actually installed as required by the Contract Documents and shown on the plans to neat line and grade.
The Contractor will not be reimbursed for unauthorized work performed outside of that required by the Contract Documents.
B1.09 TAXES
No mention shall be made in the proposal of sales tax, use tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes which may be applicable.
B1.10 RECOGNITION OF BONDING COMPANIES
All bonding companies used by the Contractor in this contract must be recognized by the Federal Government within Circular 570. All proposals or contracts received that include bonds posted by bonding companies not recognized in Circular 570 will result in the disqualification of the bid proposal and forfeiture of the bid bond.
B1.11 QUALIFICATION OF BIDDERS
Each bidder shall be skilled and regularly engaged in the general class or type of work called for under the contract. A statement setting forth his/her experience shall be submitted by each bidder on the EXPERIENCE STATEMENT form provided in SECTION C.
Each bidder shall posses a valid Contractor’s License issued by the Contractor’s State License Board at the time his/her bid is submitted. The class of license shall be applicable to the work specified in the contract. Each bidder shall also have no less than five (5) years experience in the magnitude and character of the work bid.
It is the intention of the Agency to award a contract to a bidder who furnished satisfactory evidence that he/she has the requisite experience and ability, and that he/she has sufficient capital, facilities, and plant to enable him/her to prosecute the work successfully and properly, and to complete it within the time stated in the contract.
To determine the degree of responsibility to be credited to the bidder, the Agency will weigh any evidence that the bidder has performed satisfactorily other contracts of like nature, magnitude and comparable difficulty and comparable rates of progress. If in the opinion of the Agency, a bidder is determined to be insufficiently qualified, then that bidder will not be considered for award of the contract.
B1.12 DESIGNATION OF SUPPLIERS AND SUBCONTRACTORS
Each proposal shall have listed on the DESIGNATION OF SUPPLIERS AND SUBCONTRACTORS form provided in SECTION C the name and address of each subcontractor to whom the bidder proposes to sublet portions of the work in excess of one-half percent of the total amount of his/her bid. For the purpose of this paragraph, a subcontractor is defined as one who contracts with the Contractor to furnish materials and labor, or labor only for the performance of work at the site of the work or who will specially fabricate a portion of the work off the site pursuant to detailed drawings in the contract documents.
SPC25-11 B-5
Public Contract Code § 4104 requires all bidders to list subcontractors who will perform work in excess of ½% of the total bid, or in the case of streets and highways, ½% or $10,000, whichever is greater.
Public Contract Code § 6109 prohibits a contractor from performing work with a subcontractor who is debarred pursuant to Labor Code §§ 1777.1 or 1777.7.
B1.13 PROPOSAL GUARANTEE
The proposal shall be accompanied by a proposal guarantee bond duly completed on the form provided herewith by a guarantee company authorized to carry on business in the State of California for payments to the Agency in the sum of at least 10% of the total amount of the bid proposal, or alternatively by a certified or cashier’s check payable to the Agency, or cash, in the sum of at least 10% of the total amount of the bid proposal. The amount payable to the Agency under the proposal guarantee shall be forfeited to the Agency in case of failure or neglect of the bidder to furnish, execute and deliver to the Agency the required bonds, evidence of insurance and to enter into, execute and deliver to the Agency the agreement on the form provided herewith, within ten (10) days after being notified in writing by the Agency that the award has been made and the agreement is ready for execution.
B1.14 MODIFICATION OF PROPOSAL
A modification of a bid proposal already received will be considered only if the modification is received before the time announced for the opening of bids. All modifications shall be made in writing, executed and submitted in the same form and manner as the original bid proposal.
B1.15 WITHDRAWAL OF PROPOSAL
A proposal may be withdrawn by a written request signed by the bidder. Such requests must be delivered to the Agency’s designated official prior to the bid opening hour stipulated in SECTION A – NOTICE INVITING ELECTRONIC BIDS. Proposals may not be withdrawn after that time without forfeiture of the proposal guarantee. The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so.
B1.16 POSTPONEMENT OF BID OPENING
The Agency reserves the right to postpone the date and time for opening of bids at any time prior to the date and time announced in SECTION A–NOTICE INVITING ELECTRONIC BIDS.
B1.17 DISQUALIFICATION OF BIDDERS
If there is reason to believe that collusion exists among the bidders, none of the bids of the participants in such collusion will be considered. In the event that any bidder acting as a prime Contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime Contractor.
B1.18 REJECTION OF PROPOSALS
The Agency reserves the right to reject any and all proposals, to waive any irregularity, and to reject any proposals which are incomplete, obscure or irregular; any proposals which omit a bid on any one or more items on which bids are required; which omit unit prices if unit prices are required; in which unit prices are unbalanced in the opinion of the Agency; which are accompanied by insufficient or irregular bid security; or which are from bidders who have previously failed to perform properly or to timely complete contracts of any nature.
B1.19 AWARD OF CONTRACT
The Contract will be awarded, if at all, to the lowest responsible and responsive bidder, whose bid proposal is not rejected for cause by the Agency. However, until an award is made, the Agency reserves right will be reserved to reject any or all bids, and to waive technical errors or discrepancies, if to do so is deemed to best serve the
SPC25-11 B-6
interests of the Agency. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the bidder to whom it is proposed to make such an award.
Each bidder’s attention is directed to the possibility that the award of the project may be delayed for various reasons. The Agency reserves the right to delay the award of the project for 90 calendar days. After 90 calendar days, the low bidder may at any time request release from its bid without penalty.
The acceptance of a proposal will be evidenced by a Notice of Award of Contract in writing, delivered by mail to the bidder whose proposal is accepted. No other act of the Agency shall constitute acceptance of a proposal. The award of contract shall obligate the bidder whose proposal is accepted to furnish a performance bond, payment bond and maintenance bond, as well as evidence of insurance and to execute the contract set forth herein.
B1.20 RETURN OF PROPOSAL GUARANTEES
Within ten (10) calendar days after the bids are opened, the Agency will release the proposal guarantees accompanying the proposals which are not to be considered in making the award. Proposal guarantees for the two lowest bidders will be held until the contract has been fully executed, after which they will be returned to the respective bidders.
B2.21 EXECUTION OF CONTRACT
The contract agreement shall be executed in duplicate by the successful bidder and returned, together with the contract bonds and evidence of insurance, within ten (10) calendar days after the notification of the contract award by the Agency in writing. In case of failure of the successful bidder to execute the contract agreement within ten (10) calendar days after such notice, or any subsequent extension approved by Agency, the Agency at its option may consider the bidder in default, in which case the bid bond or proposal guarantee accompanying the bid shall become the property of the Agency. After execution by the Agency, one original contract shall be returned to the Contractor.
B1.22 FLEXIBILITY OF BID SCHEDULE
It is the intent of the Agency to award a contract to the lowest responsible and responsive bidder and the flexibility shown in the bid schedule is necessary to ensure a project within the Agency’s budget limits and constraints.
SPC25-11 C-1
SECTION C
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
PROPOSAL INFORMATION AND DOCUMENTS
PROPOSAL INFORMATION AND DOCUMENTS
BID PROPOSAL
BID SCHEDULE
BID BOND
BID GUARANTEE
BIDDER INFORMATION
EXPERIENCE STATEMENT
DESIGNATION OF SUPPLIERS AND SUBCONTRACTORS
NON-COLLUSION AFFIDAVIT
SPC25-11 C-2
BID PROPOSAL
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
The undersigned, as bidder, declares that he/she has examined all of the contract documents and specifications contained in this project manual for the above referenced project, and that he/she will contract with the Agency on the form of contract provided herewith to do everything necessary for the fulfillment of this contract at the price, and on the terms and conditions therein contained.
The following are included and are to be considered as forming a part of this proposal: BID
PROPOSAL, BID SCHEDULE, BID BOND, NONCOLLUSION AFFIDAVIT, BID GUARANTEE (if submitted in lieu of Bid Bond), BIDDER INFORMATION, EXPERIENCE STATEMENT, DESIGNATION OF SUPPLIERS & SUBCONTRACTORS, BIDDER’S STATEMENT REGARDING INSURANCE COVERAGE, and STATEMENT REGARDING CONTRACTOR’S LICENSING LAWS.
Contractor acknowledges receipt and inclusion of addenda ______ to ______ into this bid proposal and the contract documents.
Attached is a Bid Bond duly completed by a guarantee company authorized to carry on business in the State of California in the amount of at least 10% of the total amount of this proposal, or alternatively, there is attached a certified or cashier’s check payable to the Agency or evidence of a cash payment to the Agency, in the amount of at least 10% of the total amount of our proposal.
If this proposal is accepted, we agree to sign the contract form and to furnish the Performance Bond and the Payment Bond (each to be 100% of the bid amount), the Maintenance Bond (to be 50% of the bid amount), and the required evidences of insurance within ten (10) calendar days after receiving written Notice of Award of Contract.
We further agree if our proposal is accepted and a contract for the performance of the work is entered into with the Agency, to so plan the work and to prosecute it with such diligence that all of the work shall be completed within the time stipulated in SECTION E - TIME OF COMPLETION.
NAME OF BIDDER: ____________________________________________________________ MAILING ADDRESS: ___________________________________________________________ STATE OF INCORPORATION: ___________________________________________________ AUTHORIZED SIGNATURE: ____________________________________________________ TITLE: _______________________________________________________________________ DATE: _______________________________________________________________________ (If Company is a Corporation, provide corporate resolution per B 1.06 PROPOSAL.)
SPC25-11 C-3
BID SCHEDULE
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
The cost of all labor, services, material, equipment and installation necessary for the completion of the work itemized under this schedule, even though not shown or specified, shall be included in the unit price for the various items shown herein. For a description of the work associated with each bid item, see SECTION E–SPECIAL PROVISIONS. The Agency reserves the right to increase or decrease the quantity of any item or omit items as may be necessary, and the same shall in no way affect or void the contract, except that appropriate additions or deductions from the contract total price will be made at the stipulated unit price in accordance with these Contract Documents.
The Agency reserves the right to reject any and all bids, to waive any informality in a bid, and to make awards in the interest of the Agency.
The Contractor shall perform an independent take-off of the plans and bid accordingly. Quantities listed in this Bid Schedule are intended only as a guide for the Contractor as to the anticipated order of magnitude of work. The Contractor shall be responsible for verifying all estimated quantities. The Contractor will be reimbursed for the quantity of items actually installed as required by the Contract Documents, including addenda, and shown on the plans to neat line and grade.
The Contractor will not be reimbursed for work performed for his convenience, or as required to adapt to field conditions, or for unauthorized work performed outside of that required by the Contract Documents.
The Contractor shall be responsible for calculating and providing totals for the bid schedule. The proposal schedule shall include all costs for labor, services, material, equipment, and installation associated with completing the work in place per the plans, specifications and details.
NAME OF BIDDER:_________________________________________________________ CONTRACTOR’S LICENSE NO.:______________________________________________ AUTHORIZED SIGNATURE:__________________________________________________ TITLE:____________________________________________________________________ DATE:____________________________________________________________________
SPC25-11 C-4
BID SCHEDULE (Continued)
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
BID SCHEDULE A
No. Item Description Estimated
Quantity
Unit Unit
Price
Item Amount
1. Cold Mill 2-Inch Uniform Depth
Including Any Asphalt Concrete
Above Lip of Gutter
84,800
SF $ $
2. Construct 2-Inch Thick Asphalt
Rubber Hot Mix (ARHM GG-C 64-
16) Overlay
1,030 TN $ $
3. Remove A.C., A.B., and Subgrade
and Construct 6-Inch Full Depth
Asphalt Concrete Pavement Over
Compacted Base/Native
2,030 SF $ $
4. Remove Existing and Construct 4-
Inch Thick PCC Sidewalk Per
SPPWC Std Plan 113-2
1,080 SF $ $
5. Remove Existing and Construct 4-
Inch Thick PCC Residential
Driveway Approach Per SPPWC Std
Plan 110-2, Match Existing Type and
Width
100 SF $ $
6. Remove Existing and Construct 6-
Inch Thick PCC Commercial
Driveway Approach Per SPPWC Std
Plan 110-2, Match Existing Type and
Width
800 SF $ $
7. Remove Existing and Construct Curb
and Gutter Per SPPWC Std Plan
120-3, Type A2-8. Match Existing
Gutter Width
60 LF $ $
8. Remove Existing and Construct Curb
and Gutter Per SPPWC Std Plan
120-3, Type A2-6. Match Existing
Gutter Width
140 LF $ $
9. Remove Existing and Construct Curb
Ramp Per SPPWC Std Plan 111-5,
Case and Type Per Plan
3 EA $ $
10. Remove and Construct Portion Of
Curb Drain Per SPPWC Std Plan
150-3. Match Existing Case, Slope,
N, and Material. Connect To
Existing Drain Behind Curb Face
1 EA $ $
SPC25-11 C-5
and/Or Back Of Walk.
11. Install Expansion Joint Filler in
Existing Sidewalk Joint 58 LF $ $
12. Adjust Orange County Sanitation
Sewer Manhole Per Orange County
Sanitation Standard Drawings S050A, S-055, and S-055A
4 EA $ $
13. Re-Establish Monuments, Centerline
Ties, Corner Ties, or Any Other
Survey Markers
4 EA $ $
14. Adjust Water Valve To Grade 14 EA $ $
15. Adjust Gas Valve To Grade 1 EA $ $
16. Adjust Water Meter To Grade 1 EA $ $
17. Adjust Manhole To Grade 5 EA $ $
18. Adjust Traffic Pull Box To Grade 1 EA $ $
19. Install Signing and Striping
Complete Per Plans 1 LS $ $
20. Implement Traffic Control 1 LS $ $
21. Site Maintenance 1 NTE $ 5000 $
Total $
Bid Schedule A Total $
Bid Schedule A Total (in words):
The Contractor shall be responsible for calculating and providing unit prices for the schedule. The proposal schedule shall include all costs for services, labor, materials, equipment, and installation associated with completing the work in place per the plans, specifications and details.
The City has the option to reject all bids with or without cause. The City also has the option to remove bid items at its discretion. If the City chooses to remove bid items, no bid price adjustment will be allowed.
For the purposes of determining the lowest responsible bidder, the Bid Schedule A Total shall be considered.
(Company Name of Bidder) (Date)
SPC25-11 C-6
BID BOND
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
KNOW ALL MEN BY THESE PRESENTS that Bidder ________________________, as PRINCIPAL, and ______________________, as SURETY, are held and firmly bound unto the City of Los Alamitos as AGENCY, in the penal sum of ___________________________________________________________ dollars ($____________________), which is ten percent (10%) of the total amount bid by PRINCIPAL to AGENCY for the above stated project, for the payment of which sum, PRINCIPAL and SURETY agree to be bound, jointly and severally, firmly by these presents.
The SURETY, for value received, hereby stipulates and agrees that the obligations of said SURETY and its BOND shall be in no way impaired or affected by any extension of the time within which the AGENCY may accept such Bid; and said SURETY does hereby waive notice of any such extension.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas PRINCIPAL is about to submit a bid to AGENCY for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by PRINCIPAL in the manner and time specified, and PRINCIPAL provides the required payment and performance bonds and insurance coverages to AGENCY, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this__ day of ., 2025.
PRINCIPAL*
________________
_____________________________________________
_____________________________________________
SURETY* _____________________________________________
_____________________________________________
_____________________________________________
*Provide BIDDER and SURETY name, address and telephone number and the name, title, address and telephone number for their authorized representatives. Power of Attorney must be attached.
Subscribed and sworn to this day of , 2025.
NOTARY PUBLIC _______________________________________________ (SEAL)
SPC25-11 C-7
BID GUARANTEE
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
Note: The following statement shall be used if other than a bid surety bond accompanies bid. “Accompanying this proposal is a money order*, certified check*, cashier’s check*, cash*, payable to the order of the City of Los Alamitos in the amount of
_______________________________________________ Dollars ($__________________) which is at least ten percent (10%) of the total amount of this bid. The proceeds of this bid guarantee shall become the property of the City of Los Alamitos provided this bid is accepted by said City, through action of its legally constituted contracting authorities, and the undersigned fails to execute a contract and furnish the required bonds and insurance within the stipulated time. Otherwise, the proceeds of this bid guarantee shall be returned to the undersigned.”
NAME OF BIDDER:
MAILING ADDRESS:
AUTHORIZED SIGNATURE:
TITLE:
DATE:
(*Delete the inapplicable words)
SPC25-11 C-8
BIDDER INFORMATION
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
BIDDER certifies that the following information is true and correct:
Name of Bidder:
Business Address:
Telephone: .FAX:
E-mail:
Contractor’s License No.: Date License Issued: .
License Expiration Date:
DIR #: _______________________________________________________________________________ The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this proposal: (Name / Title / Address / Telephone)
Any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows: (Type of Judgment / Date)
All current and prior DBA’s, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: (Principal / DBA’s / Applicable Dates)
Prior Disqualification
SPC25-11 C-9
Has your firm ever been disqualified from performing work for any City, County, Public or Private Contracting entity? Yes / No _________. If yes, provide the following information. (If more than once, use separate sheets):
Date: Entity:
Location:
Reason:
Provide Status and any Supplemental Statement:
Has your firm been reinstated by this entity? Yes / No
Violations of Federal or State Law
A. Has your firm or its officers been assessed any penalties by any agency for noncompliance, violations of Federal or State labor laws and/or business or licensing regulations within the past five (5) years relating to your construction projects?
Yes / No: Federal / State:
If “yes”, identify and describe, (including status):
Have the penalties been paid? Yes / No:___________________
SPC25-11 C-10
B. Does you firm or its officers have any ongoing investigations by any AGENCY regarding violations of the State Labor Code, California Business and Professions Code or State Licensing laws?
Yes / No: Codes / Laws: Section / Article:
If “yes”, identify and describe (including status):
I declare under penalty of perjury under the laws of the State of California that all of the representations made in this BIDDER INFORMATION are true and correct. Executed this __________________ day of _______________________________, 2025, at _____________________________________, California.
Authorized Representative Signature and Title________________________________________
SPC25-11 C-11
EXPERIENCE STATEMENT
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
Pursuant to this BID PROPOSAL and QUALIFICATION OF BIDDERS, the following is a record of the Bidder’s experience in construction of a type similar in magnitude and character to that contemplated under this contract. Included in this section should be a complete list of references for similar projects in terms of scope of work, value of work, and time constraints. The Contractor must demonstrate that he/she has experience with this type of project and can manage this project effectively. If necessary, additional numbered pages can be attached to this page. The Contractor must be properly licensed to perform the work in this project as determined by the State Contractor’s License Board.
Project Title:__________________________________ Client:_______________________________ Date: ______________ Project Value: ______________ Contact: _____________ Tel #____________ Description: __________________________________________________________________ ________________________________________________________________________ ____________________________________________________________ Subject to Federal Labor Standards: Yes No
Project Title:__________________________________ Client:_______________________________ Date: ______________ Project Value: ______________ Contact: _____________ Tel #____________ Description: __________________________________________________________________ ________________________________________________________________________ ____________________________________________________________ Subject to Federal Labor Standards: Yes No
SPC25-11 C-12
EXPERIENCE STATEMENT (Continued)
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
Project Title:__________________________________ Client:_______________________________ Date: ______________ Project Value: ______________ Contact: _____________ Tel #____________ Description: __________________________________________________________________ ________________________________________________________________________ ____________________________________________________________ Subject to Federal Labor Standards: Yes No
Project Title:__________________________________ Client:_______________________________ Date: ______________ Project Value: ______________ Contact: _____________ Tel #____________ Description: __________________________________________________________________ ________________________________________________________________________ ____________________________________________________________ Subject to Federal Labor Standards: Yes No
I declare under penalty of perjury under the laws of the State of California that all of the representations made in this EXPERIENCE STATEMENT are true and correct. Executed this __________________ day of _______________________________, 20__, at _____________________________________, California.
_________________________________________________________________ Authorized Representative Signature and Title
SPC25-11 C-13
DESIGNATION OF SUPPLIERS AND SUBCONTRACTORS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
The following is a list of subcontractors and suppliers, as defined in 2-3 SUBCONTRACTS of the Standard Specifications, who will perform work or provide materials of value in excess of one-half percent of the total bid price or $10,000, whichever is greater.
No subcontractor shall perform work in excess of the amount specified in 2-3 SUBCONTRACTS of the Standard Specifications, without the written approval of the Agency.
The Contractor is responsible to ensure that appropriate provisions are to be inserted in all subcontracts to bind subcontractors to the contract requirements as contained herein.
Each subcontractor must agree to comply with all applicable Federal, State, and local requirements.
Name and Address of
Subcontractor
Employer
Tax Id #
MBE/
WBE
(Y/N)
Work Subcontracted Portion of Work (% of
Contract Price)
SPC25-11 C-14
Name and Address of
Subcontractor
Employer
Tax Id #
MBE/
WBE
(Y/N)
Work Subcontracted Portion of Work (% of
Contract Price)
These representations are made under the penalty of perjury under the laws of the State of California.
The undersigned hereby certifies that each subcontractor has been notified in writing of its equal opportunity obligations.
NAME OF BIDDER: _________________________________________________________ AUTHORIZED SIGNATURE: __________________________________________________ Date: _____________________________
SPC25-11 C-15
NON-COLLUSION AFFIDAVIT
The undersigned declares:
I am the _______________ of _______________________, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _______[date], at _____________[city], ______________[state].
__________________________
Signature of Declarant
__________________________
Printed Name of Declarant
SPC25-11 D-1
SECTION D
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
CONTRACT INFORMATION AND DOCUMENTS
CONTRACT INFORMATION AND DOCUMENTS
CONTRACT AGREEMENT
PAYMENT BOND
FAITHFUL PERFORMANCE BOND
MAINTENANCE BONDWORKER’S COMPENSATION INSURANCE
CERTIFICATE
INSURANCE ENDORSEMENT
STATEMENT RE INSURANCE COVERAGE
STATEMENT RE THE CONTRACTOR’S LICENSING LAWS
SPC25-11 D-2
ARTICLES OF AGREEMENT
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
THIS OAK STREET IMPROVEMENTS PROJECT, SPECIFICATION NO. CIP 24/25-03 AGREEMENT (“AGREEMENT”) is made and entered into for the above-stated project this __ day of_________, _____ (Council Action Date Here), BY AND BETWEEN the City of Los Alamitos, a municipal corporation, hereafter designated as “AGENCY”, and CONTRACTOR’S BUSINESS NAME, a ____________ (State) ___________ (corporation, partnership, limited liability company, or other business form), hereafter designated as “CONTRACTOR.”
WITNESSETH that AGENCY and CONTRACTOR have mutually agreed as follows:
ARTICLE I: Contract Documents
The contract documents for the OAK STREET IMPROVEMENTS PROJECT, SPECIFICATION NO. CIP 24/25-03 shall consist of the Notice Inviting Electronic Bids, Instructions To Bidders, Bid Proposal, Bid Schedule, Standard Specifications, Special Provisions, and all referenced specifications, details, standard drawings, and appendices; together with two signed copies of the AGREEMENT, two signed copies of required bonds; one copy of the insurance certificates, permits, notices, and affidavits; and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to ensure its completion in an acceptable manner (collectively referred to herein as the “Contract Documents”). All of the provisions of the Contract Documents are made a part hereof as though fully set forth herein.
ARTICLE II: Scope of Work
For and in consideration of the payments and agreements to be made and performed by AGENCY, CONTRACTOR agrees to furnish all materials and equipment and perform all work required for the above-stated project, and to fulfill all other obligations as set forth in the aforesaid contract documents.
AGENCY hereby employs CONTRACTOR to provide the materials, do the work, and fulfill the obligations according to the terms and conditions herein contained and referred to, for the prices provided herein, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in this AGREEMENT.
In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to this AGREEMENT, CONTRACTOR offers and agrees to assign to the AGENCY all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (Section 16700, et seq.) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to CONTRACTOR, without further acknowledgment by the parties.
SPC25-11 D-3
ARTICLE III: Compensation
A. CONTRACTOR agrees to receive and accept the prices set forth in the Bid Proposal and Bid Schedule as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. In no event shall the total compensation and costs payable to CONTRACTOR under this Agreement exceed the sun of Dollars ($ ,) unless specifically approved in advance and in writing by AGENCY Such compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid Contract Documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.
B. This AGREEMENT is subject to the provisions of Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code regarding prompt payment of contractors by local governments. Article 1.7 mandates certain procedures for the payment of undisputed and properly submitted payment requests within 30 days after receipt, for the review of payment requests, for notice to Contractor of improper payment requests, and provides for the payment of interest on progress payment requests which are not timely made in accordance with that Article. This AGREEMENT hereby incorporates the provisions of Article 1.7 as though fully set forth herein.
C. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with AGENCY, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to CONTRACTOR upon Agency’s confirmation of CONTRACTOR’S satisfactory completion of this AGREEMENT. At any time during the term of this AGREEMENT CONTRACTOR may, at its own expense, substitute securities for funds otherwise withheld as retention (or the retained percentage) in accordance with Public Contract Code § 22300.
ARTICLE IV: Labor Code
AGENCY and CONTRACTOR acknowledge that this AGREEMENT is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works and public agencies and agree to be bound by all the provisions thereof as though set forth fully herein. Full compensation for conforming to the requirements of the Labor Code and with other Federal, State and local laws related to labor, and rules, regulations and ordinances which apply to any work performed pursuant to this AGREEMENT is included in the price for all contract items of work involved.
This AGREEMENT is further subject to prevailing wage law, including, but not limited to, the following:
A. The CONTRACTOR shall pay the prevailing wage rates for all work performed under the AGREEMENT. When any craft or classification is omitted from the general prevailing wage determinations, the CONTRACTOR shall pay the wage rate of the craft or classification most closely related to the omitted classification. The CONTRACTOR shall forfeit as a penalty to AGENCY $200.00 or any greater penalty provided in the Labor Code
SPC25-11 D-4
for each Calendar Day, or portion thereof, for each worker paid less than the prevailing wage rates for any work done under the AGREEMENT in violation of the provisions of the Labor Code whether such worker is employed in the execution of the work by CONTRACTOR or by any Subcontractor under CONTRACTOR. In addition, CONTRACTOR shall pay each worker the difference between such prevailing wage rates and the amount paid to each worker for each Calendar Day, or portion thereof, for which each worker was paid less than the prevailing wage rate.
B. CONTRACTOR shall comply with the provisions of Labor Code Section 1777.5 concerning the employment of apprentices on public works projects, and further agrees that CONTRACTOR is responsible for compliance with Section 1777.5 by all of its subcontractors.
C. Pursuant to Labor Code § 1776, CONTRACTOR and any subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with this AGREEMENT. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: (1) The information contained in the payroll record is true and correct; and (2) The employer has complied with the requirements of Labor Code §§ 1811, and 1815 for any work performed by his or her employees on the public works project. The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours as required by Labor Code § 1776.
D. This AGREEMENT is further subject to 8-hour work day and wage and hour penalty law, including, but not limited to, Labor Code Sections 1810 and 1813, as well as California nondiscrimination laws, as follows:
CONTRACTOR shall strictly adhere to the provisions of the Labor Code regarding the 8- hour day and the 40-hour week, overtime, Saturday, Sunday and holiday work and nondiscrimination on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex or sexual orientation, except as provided in Section 12940 of the Government Code. Pursuant to the provisions of the Labor Code, eight hours’ labor shall constitute a legal day’s work. Work performed by CONTRACTOR’s employees in excess of eight hours per day, and 40 hours during any one week, must include compensation for all hours worked in excess of eight hours per day, or 40 hours during any one week, at not less than one and one-half times the basic rate of pay. CONTRACTOR shall forfeit as a penalty to AGENCY $25.00 or any greater penalty set forth in the Labor Code for each worker employed in the execution of the work by CONTRACTOR or by any Subcontractor of CONTRACTOR, for each Calendar Day during which such worker is required or permitted to the work more than eight hours in one Calendar Day or more than 40 hours in any one calendar week in violation of the Labor Code.
E. This AGREEMENT is subject to Public Contract Code Section 6109:
CONTRACTOR shall be prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Sections 1777.1 or 1777.7 of the Labor Code.
SPC25-11 D-5
ARTICLE V: Work Site Conditions
A. In compliance with and pursuant to Government Code Section 4215, AGENCY shall assume the responsibility, as between the parties to this AGREEMENT, for the timely removal, relocation, or protection of existing main- or trunk-line utility facilities located on the site of any construction project that is a subject of this AGREEMENT, if such utilities are not identified by AGENCY in the plans and specifications made a part of the invitation for bids. The Contract Documents shall include provisions to compensate CONTRACTOR for the costs of locating, repairing damage not due to the failure of CONTRACTOR to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy, and for equipment on the project necessarily idled during such work. CONTRACTOR shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of AGENCY or the owner of a utility to provide for removal or relocation of such utility facilities.
B. To the extent that the work requires trenches in excess of five feet (5’) and is estimated to cost more than $25,000, prior to any excavation, CONTRACTOR must provide the AGENCY, or a registered civil or structural engineer employed by the AGENCY to whom authority has been delegated to accept such plans, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. Nothing in this section shall be deemed to allow the use of a shoring, sloping, or protective system less effective than that required by the Construction Safety Orders.
C. This AGREEMENT is further subject to Public Contract Code Section 7104 with regard to any trenches deeper than four feet (4’) involved in the proposed work as follows:
CONTRACTOR shall promptly, and before the following conditions are disturbed, notify AGENCY, in writing, of any:
(1) Material that CONTRACTOR believes may be hazardous waste, as defined in Section 25117 of the Health and Safety Code, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with existing law. (2) Subsurface or latent physical conditions at the site differing from those indicated by all available information provided prior to the deadline for submission of bids. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
AGENCY shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or involve hazardous waste, and cause a decrease or increase in CONTRACTOR’s cost of, or the time required for, performance of any part of the work, AGENCY shall issue a change order under the procedures described in this AGREEMENT.
In the event that a dispute arises between AGENCY and CONTRACTOR whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in CONTRACTOR’s cost of, or time required for, performance of any part of the work,
SPC25-11 D-6
CONTRACTOR shall not be excused from any scheduled completion date provided in the AGREEMENT, but shall proceed with all work to be performed under the AGREEMENT.
CONTRACTOR shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties.
ARTICLE VI: Insurance
A. With respect to performance of work under this AGREEMENT, CONTRACTOR shall maintain, and shall require all of its subcontractors to maintain, insurance as required by Section E “Standard Specifications” of the Contract Documents.
B. This AGREEMENT is further subject to Workers’ Compensation obligations, including, but not limited to, California Labor Code Sections 1860 and 1861 as follows:
CONTRACTOR shall take out and maintain, during the life of this contract, Worker’s Compensation Insurance for all of CONTRACTOR’s employees employed at the site of improvement; and, if any work is sublet, CONTRACTOR shall require the subcontractor similarly to provide Worker’s Compensation Insurance for all of the latter’s employees, unless such employees are covered by the protection afforded by CONTRACTOR.
CONTRACTOR and any of CONTRACTOR’s subcontractors shall be required to provide AGENCY with a written statement acknowledging its obligation to secure payment of Worker’s Compensation Insurance as required by Labor Code § 1861; to wit: ‘I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.’ If any class of employees engaged in work under this AGREEMENT at the site of the Project is not protected under any Worker’s Compensation law, CONTRACTOR shall provide and shall cause each subcontractor to provide adequate insurance for the protection of employees not otherwise protected.
CONTRACTOR shall indemnify and hold harmless AGENCY for any damage resulting from failure of either CONTRACTOR or any subcontractor to take out or maintain such insurance.
ARTICLE VII: Indemnification
To the fullest extent permitted by law, CONTRACTOR shall, at its sole cost and expense, fully defend, indemnify and hold harmless AGENCY, its authorized representatives and their respective subsidiaries, affiliates, members, directors, officers, employees and agents (collectively, the “Indemnitees”) from and against any and all claims, actions, demands, costs, judgments, liens, penalties, liabilities, damages, losses, and expenses, including but not limited to any fees of accountants, attorneys or other professionals (collectively “Liabilities”), arising out of, in connection with, resulting from or related to, any act, omission, fault or negligence of CONTRACTOR, CONTRACTOR’s Representative, or any of its officers, agents, employees, Subcontractors or Suppliers, or any person or organization directly or indirectly employed by any of them (Collectively, the “Indemnitors”), in connection with or relating to or claimed to be in connection with or relating to the work performed under this AGREEMENT.
If CONTRACTOR is a joint venture or partnership, each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of CONTRACTOR that are assumed under or arise out of this AGREEMENT. Each of such venturers or partners waives notice of the breach or non-performance of any undertaking or obligation of CONTRACTOR
SPC25-11 D-7
contained in, resulting from or assumed under this AGREEMENT, and the failure to give any such notice shall not affect or impair such venturer’s or partner’s joint and several liability hereunder.
ARTICLE VIII: Binding Effect
AGENCY and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto and to its partners, successors, assigns, and legal representatives in respect of all covenants, agreements, and obligations contained in the Contract Documents. This AGREEMENT is not assignable nor the performance of either party’s duties delegable without the prior written consent of the other party. Any attempted or purported assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.
ARTICLE IX: Dispute Resolution
A. In the event of a dispute arising out of the terms of this AGREEMENT, including any action brought to declare the rights granted herein or to enforce any of the terms of this AGREEMENT, the party prevailing in such dispute shall be entitled to all reasonable costs and litigation expenses actually incurred, including fees of attorneys and expert witnesses.
Any court action arising out of this AGREEMENT shall be filed in the Orange County Superior Court. Any alternative dispute resolution proceeding arising out of this AGREEMENT shall be heard in the City of Los Angeles or the City of Los Alamitos, California.
B. AGENCY shall have full authority to compromise or otherwise settle any claim relating to this AGREEMENT or any part hereof at any time. AGENCY shall provide timely notification to CONTRACTOR of the receipt of any third-party claim relating to this AGREEMENT. AGENCY shall be entitled to recover its reasonable costs incurred in providing the notification required by this section.
C. This AGREEMENT is further subject to the provisions of Article 1.5 (commencing at Section 20104) of Division 2, Part 3 of the Public Contract Code regarding the resolution of public works claims of less than $375,000. Article 1.5 mandates certain procedures for the filing of claims and supporting documentation by Contractor, for the response to such claims by the Agency, for a mandatory meet and confer conference upon the request of Contractor, for mandatory nonbinding mediation in the event litigation is commenced, and for mandatory judicial arbitration upon the parties’ failure to resolve the dispute through mediation. This AGREEMENT hereby incorporates the provisions of Article
1.5 as though fully set forth herein.
ARTICLE X: Independent Contractor
CONTRACTOR is and shall at all times remain as to AGENCY, a wholly independent contractor. Neither AGENCY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR’s employees, except as herein set forth.
CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of AGENCY.
SPC25-11 D-8
ARTICLE XI: Taxes
CONTRACTOR is responsible for paying all retail, sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this AGREEMENT. The CONTRACTOR is responsible for ascertaining and arranging to pay such taxes and duties. The prices established in this AGREEMENT shall include compensation for any taxes the CONTRACTOR is required to pay by laws and regulations in effect as of the execution of this AGREEMENT.
ARTICLE XII: Notices
All notices and communications shall be sent in writing to the parties at the following addresses:
AGENCY: Ron Noda CONTRACTOR: [INSERT CONTACT]
CITY OF LOS ALAMITOS CONTRACTOR’S BUSINESS NAME
3191 Katella Avenue Mailing Street Address
Los Alamitos, CA 90720 City, State Zip Code
ARTICLE XIII: Entire Agreement
This AGREEMENT supersedes any and all other agreements, either oral or written, between the parties and contains all of the covenants and agreements between the parties pertaining to the work of improvements described herein. Each party to this AGREEMENT acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statement or promise not contained in this AGREEMENT shall not be valid or binding. Any modification of this AGREEMENT will be effective only if signed by the party to be charged.
The benefits and obligations of this AGREEMENT shall inure to and be binding upon the representatives, agents, partners, heirs, successors and assigns of the parties hereto. This AGREEMENT shall be construed pursuant to the laws of the State of California.
ARTICLE XIV: Authority to Contract
The signatories hereto represent that they are authorized to sign on behalf of the respective parties they represent and are competent to do so, and each of the parties hereto hereby irrevocably waives any and all rights to challenge signatures on these bases.
ARTICLE XV: General Provisions
A. All reports, documents or other written material (“written products” herein) developed by CONTRACTOR in the performance of this Agreement shall be and remain the property of AGENCY without restriction or limitation upon its use or dissemination by AGENCY. CONTRACTOR may take and retain copies of such written products as desired,
SPC25-11 D-9
but no such written products shall be the subject of a copyright application by CONTRACTOR.
B. In the performance of this Agreement, CONTRACTOR shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, creed, religion, sex, marital status, sexual orientation, national origin, ancestry, age, physical or mental disability, medical condition or any other unlawful basis.
C. The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement.
Should there be any conflict between such heading, and the section or paragraph at the head of which it appears, the section or paragraph hereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement. Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).
D. The waiver by AGENCY or CONTRACTOR of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. No term, covenant or condition of this Agreement shall be deemed to have been waived by AGENCY or CONTRACTOR unless in writing.
E. Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such party of any of all of such other rights, powers or remedies.
IN WITNESS WHEREOF the parties hereto for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this AGREEMENT to be executed in duplicate by setting hereunto their names, titles, hands, and seals this __ day of December, 2025 (Council Action Date Here)
CONTRACTOR: Contractor’s Business Name
__________________________________________
Contractor’s Sign Name, Title
Contractor’s License No. XXXXXX
Subscribed and sworn to this _______ day of _________, 20__.
SPC25-11 D-10
NOTARY PUBLIC ______________________________________________ (SEAL) AGENCY: ______________________________ __________
Mayor Date
City of Los Alamitos
ATTESTED: ______________________________ __________
Windmera Quintanar, MMC, City Clerk Date
City of Los Alamitos
APPROVED AS
TO FORM: ______________________________ __________
Michael S. Daudt, City Attorney Date
City of Los Alamitos
( E X E C U T E I N D U P L I C A T E )
SPC25-11 D-11
PAYMENT BOND
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
WHEREAS, the City of Los Alamitos, as AGENCY has awarded to Contractor’s Business Name, as CONTRACTOR, a contract for the above-stated project;
AND WHEREAS, CONTRACTOR is required to furnish a bond in connection with the contract, to secure the payment of claims of laborers, mechanics, material persons, and other persons as provided by law; NOW THEREFORE, we, the undersigned CONTRACTOR and SURETY, are held and firmly bound unto AGENCY in the sum of [DESCRIBE VERBALLY; 100% OF TOTAL CONTRACT AMOUNT—TO BE INSERTED BY CONTRACTOR]Dollars ($XXX,XXX.XX) which is one hundred percent (100%) of the total contract amount for the above-stated project, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION IS SUCH that if CONTRACTOR, its heirs, executors, administrators, successors, assigns or subcontractors, shall fail to pay any of the persons named in Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor withheld, and to pay over to the Employment Development Department from the wages of employees of the CONTRACTOR and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to such work and labor, that the surety or sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, SURETY will pay reasonable attorneys’ fees to the plaintiffs and AGENCY in an amount to be fixed by the court.
This bond shall inure to the benefit to any of the persons named in Civil Code Section 3181 as to give a right of action to such persons or their assigns in any suit brought upon this bond.
The SURETY hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or the specifications accompanying it shall in any manner affect SURETY’s obligations on this bond. The SURETY hereby waives notice of any such change, extension, alteration or addition and hereby waives the requirements of Section 2845 of the Civil Code as a condition precedent to any remedies AGENCY may have.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of ________________, 20__.
Contractor* Contractor’s Signer’s Name, Title
Contractor’s Business Name
Mailing Street Address
City, State, Zip Code
Telephone #
Surety* _________________________________________________ _________________________________________________
_________________________________________________
________________________________________________
*Provide CONTRACTOR and SURETY name, address and telephone number and the name, title, address and telephone number for the respective authorized representatives. Power of Attorney must be attached.
Subscribed and sworn to this___ day of _____________________, 20__.
NOTARY PUBLIC........................................................................................................ .......................................................................................................................................(SEAL) (E X E C U T E I N D U P L I C A T E)
SPC25-11 D-12
FAITHFUL PERFORMANCE BOND
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
KNOW ALL PERSONS BY THESE PRESENTS That Contractor’s Business Name, hereinafter referred to as “CONTRACTOR” as PRINCIPAL, and
, a corporation duly organized and doing business under and by virtue of the laws of the State of California and duly licensed for the purpose of making, guaranteeing, or becoming sole surety upon bonds or undertakings as Surety, are held and firmly bound unto the CITY OF LOS ALAMITOS, CALIFORNIA, hereinafter referred to as the “AGENCY” in the sum of [DESCRIBE VERBALLY; 100% OF TOTAL CONTRACT AMOUNT—TO BE INSERTED BY CONTRACTOR]Dollars ($XXX,XXX.XX); which is one hundred percent (100%) of the total contract amount for the above stated project; lawful money of the United States of America for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, assigns and successors, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that whereas CONTRACTOR has been awarded and is about to enter into a Contract with AGENCY to perform all work required pursuant to the contract documents for the project entitled: OAK STREET IMPROVEMENTS PROJECT, SPECIFICATION NO. CIP 24/25-03 CONTRACT which Contract is by this reference incorporated herein, and is required by AGENCY to give this Bond in connection with the execution of the Contract;
NOW, THEREFORE, if CONTRACTOR and his or her Subcontractors shall well and truly do and perform all the covenants and obligations of the Contract on his or her part to be done and performed at the times and in the manner specified herein including compliance with all Contract specifications and quality requirements, then this obligation shall be null and void, otherwise it shall be and remain in full force and effect;
PROVIDED, that any alterations in the work to be done, or in the material to be furnished, which may be made pursuant to the terms of the Contract, shall not in any way release CONTRACTOR or the Surety thereunder, nor shall any extensions of time granted under the provisions of the Contract release either CONTRACTOR or said Surety, and notice of such alterations of extensions of the Contract is hereby waived by said Surety.
In the event suit is brought upon this Bond by AGENCY and judgment is recovered, said Surety shall pay all costs incurred by AGENCY in such suit, including a reasonable attorney’s fee to be fixed by the Court.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this_____day of , 20__
Contractor* Name, Title of Signer
SURETY*………………………………………….
Contractor’s Business Name
……………………………………………
Mailing Street Address
……………………………………………
City, State, Zip Code
……………………………………………
Telephone #
……………………………………………
*Provide CONTRACTOR and SURETY name, address and telephone number and the name, title, address and telephone number for their respective authorized representatives. Power of Attorney must be attached.
SPC25-11 D-13
Subscribed and sworn to this___ day of ______________ , 20__ NOTARY PUBLIC..................................................................................................(SEAL) (E X E C U T E I N D U P L I C A T E)
SPC25-11 D-14
MAINTENANCE BOND
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
KNOW ALL PERSONS BY THESE PRESENTS THAT WHEREAS, the City of Los Alamitos, as AGENCY has awarded to Contractor’s Business Name, as CONTRACTOR, a contract for the abovestated project.
AND WHEREAS, CONTRACTOR is required to furnish a bond in connection with the contract guaranteeing maintenance thereof;
NOW, THEREFORE, we, the undersigned CONTRACTOR and SURETY, are held firmly bound unto AGENCY in the sum of DESCRIBE VERBALLY; 50% OF TOTAL CONTRACT AMOUNT—TO BE INSERTED BY CONTRACTOR]Dollars ($XXX,XXX.XX), which is fifty percent (50%) of the total contract amount for the above-stated project to be paid to AGENCY, its successors and assigns, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that if CONTRACTOR shall remedy without cost to AGENCY any defects which may develop during a period of one (1) year from the date of recordation of the Notice of Completion of the work performed under the contract, provided such defects are caused by defective or inferior materials or work, then this obligation shall be void; otherwise it shall be and remain in full force and effect. In case suit is brought upon this bond, SURETY will pay reasonable attorneys’ fees to the AGENCY in an amount to be fixed by the court.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this____ day of
......................................, 20__.
Contractor* Contractor’s Signer’s Name, Title
Contractor’s Business Name
Mailing Street Address
City, State, Zip Code
Telephone #
SURETY* ______________________________________________
______________________________________________
______________________________________________
______________________________________________
*Provide CONTRACTOR and SURETY name, address and telephone number and the name, title, address and telephone number for their respective authorized representatives. Powers of Attorney must be attached.
Subscribed and sworn to this ........... day of..............................., 20__.
NOTARY PUBLIC.................................................................................................. .................................................................................................................................(SEAL) (EXECUTE IN DUPLICATE)
SPC25-11 D-15
WORKERS’ COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
DATE: Contractor’s Business Name .
(Contractor)
By:
(Signature)
(Title)
Attest:
By:
(Signature)
(Title)
Note: See Section 5 Legal Relations and Responsibilities, Subsection 5-4 of the Standard Specifications for insurance carrier rating requirements.
SPC25-11 D-16
ENDORSEMENTS TO INSURANCE POLICY
Name of Insurance Company:
Policy Number:
Effective Date:
The following endorsements are hereby incorporated by reference into the attached Certificate of Insurance as though fully set forth thereon:
1. The naming of an additional insured as herein provided shall not affect any recovery to which such additional insured would be entitled under this policy if not named as such additional insured, and
2. The additional insured named herein shall not be held liable for any premium or expense of any nature on this policy or any extensions thereof, and
3. The additional insured named herein shall not by reason of being so named be considered a member of any mutual insurance company for any purpose whatsoever, and
4. The provisions of the policy will not be changed, suspended, canceled or otherwise terminated as to the interest of the additional insured named herein without first giving such additional insured twenty (20) days’ written notice.
5. Any other insurance held by the additional insured shall not be required to contribute anything toward any loss or expense covered by the insurance, which is referred to by this certificate.
6. The company provided insurance for this certificate is a company licensed to do business in the State of California with a Best’s rating of A+ VIII or greater.
It is agreed that the City of Los Alamitos, its officers and employees, are included as Additional Insureds under the contracts of insurance for which the Certificate of Insurance is given.
Authorized Insurance Agent
Date:
SPC25-11 D-17
STATEMENT REGARDING INSURANCE COVERAGE
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
The undersigned representative of Bidder hereby certifies that he/she has reviewed the insurance coverage requirements specified in 5.4 LIABILITY INSURANCE of Section E, Standard Specifications. Should Bidder be awarded the contract for the work, the undersigned further certifies that Bidder can meet all of these specification requirements for insurance including insurance coverage of his/her subcontractors.
NAME OF BIDDER: .......................................................................................................
MAILING ADDRESS: ....................................................................................................... ....................................................................................................... .......................................................................................................
AUTHORIZED SIGNATURE: .......................................................................................................
TITLE: .......................................................................................................
DATE: .......................................................................................................
SPC25-11 D-18
STATEMENT REGARDING CONTRACTOR’S LICENSING LAWS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
[Business & Professions Code § 7028.15]
[Public Contract Code § 20103.5]
I, the undersigned, certify that I am aware of the following provisions of California law and that I, or the entity on whose behalf this certification is given, hold a currently valid California contractor’s license as set forth below:
Business & Professions Code § 7028.15:
a) It is a misdemeanor for any person to submit a bid to a public agency to engage in the business or act in the capacity of a contractor within this state without having a license therefor, except in any of the following cases:
(1)The person is particularly exempted from this chapter. (2)The bid is submitted on a state project governed by Section 10164 of the Public Contract Code or on any local agency project governed by Section 20104 [now § 20103.5] of the Public Contract Code.
b) If a person has been previously convicted of the offense described in this section, the court shall impose a fine of 20 percent of the price of the contract under which the unlicensed person performed contracting work, or four thousand five hundred dollars ($4,500), whichever is greater, or imprisonment in the county jail for not less than 10 days nor more than six months, or both.
In the event the person performing the contracting work has agreed to furnish materials and labor on an hourly basis, “the price of the contract” for the purposes of this subdivision means the aggregate sum of the cost of materials and labor furnished and the cost of completing the work to be performed.
c) This section shall not apply to a joint venture license, as required by Section 7029.1.
However, at the time of making a bid as a joint venture, each person submitting the bid shall be subject to this section with respect to his/her individual licenser. d) This section shall not affect the right or ability of a licensed architect, land surveyor, or registered professional engineer to form joint ventures with licensed contractors to render services within the scope of their respective practices. e) Unless one of the foregoing exceptions applies, a bid submitted to a public agency by a contractor who is not licensed in accordance with this chapter shall be considered nonresponsive and shall be rejected by the public agency. Unless one of the foregoing exceptions applies, a local public agency shall, before awarding a contract or issuing a purchase order, verify that the contractor was properly licensed when the contractor submitted the bid. Notwithstanding any other provision of law, unless one of the foregoing exceptions applies, the registrar may issue a citation to any public officer or employee of a public entity who knowingly awards a contract or issues a purchase order to a contractor who is not licensed pursuant to this chapter. The amount of civil penalties, appeal, and finality of such citations shall be subject to Sections 7028.7 to 7028.13, inclusive. Any contract awarded to, or any purchase order issued to, as contractor who is not licensed pursuant to this chapter is void. f) Any compliance or noncompliance with subdivision (e) of this section, as added by Chapter 863 of the Statutes of 1989, shall not invalidate any contract or bid awarded by a public agency during which time that subdivision was in effect.
SPC25-11 D-19
g) A public employee or officer shall not be subject to a citation pursuant to this section if the public employee, officer, or employing agency made an inquiry to the board for the purposes of verifying the license status of any person or contractor and the board failed to respond to the inquiry within three business days. For purposes of this section, a telephone response by the board shall be deemed sufficient.
Public Contract Code § 20103.5:
In all contracts subject to this part where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of this state.
However, at the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of this state. The first payment for work or material under any contract shall not be made unless and until the Registrar of Contractors verifies to the agency that the records of the Contractors’ State License Board indicate that the contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law, including, but not limited to, any appropriate disciplinary action by the Contractors’ State License Board. The agency shall include a statement to that effect in the standard form of pre-qualification questionnaire and financial statement. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder.
Contractors License Number: _____________________________________________ License Expiration Date: _____________________________________________ Authorized Signature: _____________________________________________ Date: _____________________________________________
SPC25-11 E-1
SECTION E
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
STANDARD SPECIFICATION
SPC25-11 E-2
STANDARD SPECIFICATIONS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
0-1 STANDARD SPECIFICATIONS
Except as hereinafter amended, the provisions of the 2024 Edition of the “Green Book,” Standard Specifications for Public Works Construction (“SSPWC”), with the latest Supplements, prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, and these modifications thereto are adopted as the “Standard Specifications” for the Agency. These Standard Specifications will be numbered as Sections 0 through 800 per the SSPWC.
0-2 NUMBERING OF SECTIONS
The numbering of sections and subsections in these amendments and modifications are compatible with the numbering of sections in the SSPWC.
0-3 AMENDMENTS AND MODIFICATIONS
The following sections of the SSPWC are amended as provided herein. In the event of any inconsistencies between the amendments outlined herein and the SSPWC, these amendments shall control.
1-2 TERMS AND DEFINITIONS
Add the following:
Agent—Shall include persons and companies, other than the Contractor, retained by the City to perform design and construction services in relation to the Work.
Acceptance—The Agency’s formal written acceptance of a project that has been completed in all respects in accordance with the plans and specifications and any modifications thereof.
City—The City of Los Alamitos, California, as the Agency and Owner.
City Council—City Council of the City of Los Alamitos, California.
Construction Manager—Persons and/or company retained by the City to perform construction management services.
Design Engineer—Persons and/or company retained by the City to perform engineering design services.
Due Notice—A written notification, provided in due time, of a proposed action, where the contract requires such notification within a specified time (usually 48 hours or two working days) prior to the commencement of the contemplated action.
Engineer—The City Engineer of the City of Los Alamitos, or his/her authorized representative.
Geotechnical Engineer—Person licensed to practice Soils Engineering or Geotechnical Engineering pursuant to the laws of the State of California and retained by the Agency during construction.
SPC25-11 E-3
Prompt—The briefest interval of time required for a considered reply, including time required for approval by a governing body.
Standard Plans—“Standard Plans for Public Works Construction” - Latest edition of the Southern California Chapter of the American Public Works Association.
State Standard Specifications (“SSS”)—Standard Specifications prepared by the State of California, Business and Transportation Agency, Department of Transportation.
State Standard Plans (“SSP”)—Standard Plans prepared by State of California, Business and Transportation Agency, Department of Transportation.
Working Days—Any days, except: (1) Saturdays, Sundays, legal holidays on which Los Alamitos City Hall is closed for business; (2) days when work is suspended by the Engineer for reasons unrelated to the performance of the contractor, and provided in Subsections 6-3 and 6-3.1; and (3) days determined to be non-working in accordance with Section 6-3 “Time of Completion”. 1-3.3 INSTITUTIONS
Add the following:
AGCA Associated General Contractors of America
ASME American Society of Mechanical Engineers
CRSI Concrete Reinforcing Steel Institute
CSI Construction Specifications Institute
NFPA National Fire Protection Association
SSS State of California Standard Specifications, latest edition, Department of Transportation SSP State of California Standard Plans, latest edition, Department of Transportation.
SSPWC Standard Specifications for Public Works Construction, as specified in Subsection 0-1 1-6 BIDDING AND SUBMISSION OF THE BID
1-6.2 SUBCONTRACTOR LISTING
Replace the third paragraph with the following:
Subcontracting of more than one-half of one percent of the work for which no Subcontractor was designated in the original Bid will be allowed only in cases of public emergency or necessity and only after the Engineer makes a written finding of circumstances constituting public emergency or necessity.
Delete the fourth paragraph and replace with the following:
SPC25-11 E-4
The Contractor must obtain written consent of the City Council to substitute a Subcontractor designated in the original Bid, to permit any subcontract to be assigned or transferred, or to otherwise allow a subcontract to be performed by anyone other than the originally designated Subcontractor.
Delete the fifth paragraph and replace with the following:
A violation of any of the above provisions will be considered a violation of the Contract, and the City may cancel the Contract and collect appropriate damages or assess the Contractor a penalty of not more than ten (10) percent of the subcontract involved.
Add the following:
If subcontracted work is not being performed in a satisfactory manner, the City will notify the Contractor of the need to take corrective action and the Engineer may report the facts to the City Council. Upon order by City Council and the Contractor’s receipt of written instructions from the Engineer, the Subcontractor shall immediately be removed from the Work and may not again be employed on the Work.
1-7 AWARD AND EXECUTION OF THE CONTRACT
1-7.1 GENERAL
Add the following:
The City reserves the right to reject any or all proposals.
The Contract will be awarded, if at all, to the lowest responsible and responsive Bidder determined as provided on the Proposal Form, whose proposal complies with all the requirements prescribed. Such award, if made, will be made within the number of days stated in the proposal form. Refusal or failure to deliver the executed contract, bonds, or insurance in the form provided in the Contract and approved by the Agency’s attorney within the time provided herein shall be cause, at the Agency’s option, for the annulment of the award and forfeiture of the bid security. In such event, the Agency may successively award the Contract to the next lowest responsible and responsive Bidder until a properly executed Contract, bonds, and insurance is obtained, or it may at any time reject all remaining bids and proceed as provided by law. The refusal or failure of a successive lowest responsible and responsive Bidder to execute the Contract may, at the Agency’s option, result in an annulment of the award to that Bidder and the forfeiture of that Bidder’s bid security. The periods of time specified above within which the award of the Contract may be made shall be subject to extension for such further period as may be agreed upon in writing between the Agency and the concerned Bidder.
The Agency reserves the right to waive any irregularities.
Within ten (10) calendar days after the date of the Notice of Award, the Contractor shall execute and return the following contract documents to the Agency:
Contract Agreement (in duplicate)
Faithful Performance Bond (in duplicate)
Maintenance Bond (in duplicate)
Payment Bond (in duplicate)
Public Liability and Property Damage Insurance Certificate (two original) Additionally Insured Endorsement
Workers’ Compensation Insurance Certificate (two original)
SPC25-11 E-5
A corporation to which an award is made may be required, before the Contract agreement is executed by the Agency, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and that the officers signing the contract and bonds for the corporation have the authority to do so.
1-7.2 CONTRACT BONDS
Add the following:
The PAYMENT BOND shall remain in force until thirty-five (35) days after the date of recordation of the Notice of Completion. The FAITHFUL PERFORMANCE BOND shall remain in force until the date of recordation of the Notice of Completion. The MAINTENANCE BOND shall remain in force until one (1) year after the date of recordation of the Notice of Completion.
All bonds must be accompanied by a Power of Attorney
SECTION 2 – SCOPE OF THE WORK
2-1 WORK TO BE DONE
Add the following:
Any plan or method of work suggested by the Agency or the Engineer to the Contractor but not specified or required, if adopted or followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the Contractor; and the Agency and the Engineer shall assume no responsibility therefore and in no way be held liable for any defects in the work which may result from or be caused by use of such plan or method of work.
The work includes, but is not necessarily limited to, the following items as shown on the plans and specified in these Special Provisions:
The City of Los Alamitos proposes to cold mill and overlay pavement with asphalt rubber hot mix (ARHM) and remove and construct sidewalk, curb, gutter, curb ramps, curb drains, and full depth asphalt concrete pavement. Additional items of work include installing detectable warning surface, signing, and striping and adjusting manhole frames and utility valves to grade. Existing private facilities will be protected in place within the limits of the project unless otherwise shown. 2-2 PERMITS
Replace first paragraph with the following:
Prior to the start of any work, the Contractor shall apply for and receive any applicable City, County, State, and Federal permits.
2-3 RIGHT-OF-WAY
Add the following:
SPC25-11 E-6
When the Contractor arranges for additional work areas and facilities temporarily required by him/her, he/she shall provide the Agency with proof that the additional work areas and/or facilities have been left in a condition satisfactory to the owner(s) of said work areas and/or facilities prior to acceptance of the work.
2-4 COOPERATION AND COLLATERAL WORK
Add the following:
Contractor shall coordinate his/her work so as to minimize disruption to ongoing or scheduled private development projects in the project area.
2-7 CHANGES INITIATED BY THE AGENCY
2-7.1 GENERAL
Add the following:
All final locations determined in the field, and any deviations from the Plans and Specification, shall be marked in red on the documents to show the as-built conditions. Contractor shall maintain a complete and accurate record of all changes of construction from that shown in these plans and specifications for the purpose of providing a basis for construction record drawings. No changes shall be made without prior written approval of the Engineer. Upon completion of the Project, Contractor shall deliver this record of all construction changes to the Engineer along with a letter which declares that other than these noted changes “the Project was constructed in conformance with the Contract Documents”. Final payment will not be made until this requirement is met.
As the figured dimensions shown on the drawings and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions shall be followed in preference to the scaled dimensions, and drawings to a large scale shall be followed in preference to the drawings to a small scale. Should it appear that the work to be performed, or any related matter, are not sufficiently detailed or explained in the Contract documents, the Contractor shall apply to the Engineer for such further explanations as necessary, and shall conform to such further explanations provided by the Engineer as part of the Contract to the extent that it is consistent with the terms of the Contract.
Caution: The engineer preparing these plans will not be responsible or liable for unauthorized changes to or uses of these plans. All changes to the plans must be approved in writing by the Engineer.
SECTION 3 – CONTROL OF THE WORK
3-3 SUBCONTRACTORS
Replace the first paragraph with the following:
All persons engaged in the Work, including Subcontractors and their employees, will be considered employees of the Contractor. The Contractor will be held responsible for their work. The Agency will deal directly and solely with the Contractor and make all payments to the Contractor. 3-5 INSPECTION
Add the following:
SPC25-11 E-7
The Agency shall inspect for compliance with requirements for 8-hour days and 40-hour weeks on normal working days. The Contractor shall reimburse the Agency, at rates established by the Agency, for any additional inspection, including inspection on legal holidays. 3-10 SURVEYING
3-10.1 GENERAL
Add the following:
The Contractor shall perform and shall be responsible for the accuracy of surveying adequate for construction. The Contractor shall preserve construction survey stakes and marks for the duration of their usefulness. If any construction survey stakes are lost or disturbed and need to be replaced, such replacement shall be at the expense of the Contractor.
The Contractor shall dig all holes necessary for line and grade stakes.
Stakes shall be set and stationed by the Contractor for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) shall be indicated on a grade sheet.
Subsection 3-10.2 Line and Grade is amended by adding thereto the following:
The line and grades for construction shall be parallel to and offset from the position of the work. From the established lines and grades, the Contractor shall extend the necessary lines and grades for construction of the work and shall be responsible for the correctness of same.
Section 3-10 is amended by adding thereto the following new Subsection 3-10.3 Survey Service. 3-10.3 Survey Service.
For this improvement work, the Contractor shall furnish all labor, equipment, and (Private Engineer) services, and be responsible for all surveying, staking, and layout necessary for the improvements. In the event of a substantial discrepancy between information shown on the Plans and actual field conditions, the Contractor shall cease any affected work and notify the City Engineer. The City Engineer shall provide direction and authority to proceed. Surveying by Private Engineers on the Work shall conform to the quality and practice required by the City Engineer.
Survey monuments shall be furnished, installed and in compliance to Section 309 Monuments, as modified in these special provisions.
The Contractor shall follow the guidelines below.
All work is to be performed by a person or under the supervision of a person authorized to practice Land Surveying.
PRIOR TO CONSTRUCTION
1. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
SPC25-11 E-8
2. The contractor shall submit a list of all known monuments within the project limits to the engineer.
3. The survey crew shall diligently search for all survey monuments of record on the within the project limits. It is suggested the search would include the use of a metal detector when recorded monuments cannot be found. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument within 2” of the road surface is recommended.
4. The survey crew shall tie off any found survey monuments, which may be disturbed or covered during construction, to stable surface points.
5. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item 4, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing.
AFTER CONSTRUCTION AND PRIOR TO RECORDING NOTICE OF COMPLETION
1. All covered or disturbed monuments and surface monuments are reset in the new road surface, or a new monument is set in the new road surface above the buried one.
2. All existing monument boxes will be adjusted to grade or replaced, as appropriate.
3. A monument box or other protective structure should be placed around key monuments (section corners, quarter section corners)
4. The authorized surveyor shall property complete a Corner Record or Record of Survey for all set monuments and existing monuments with a change in character, including tag number and submit it to the County Surveyor for review, signature and filing.
LIST OF KNOWN MONUMENTS
• Intersection of Oak St and Florista St
• Intersection of Oak St and Sausalito St
• West side of Oak St 280’ south of Catalina Ave
• West side of Oak St between 10692 Oak St and 10684 Oak St The existence and location of monuments in the above list was obtained by a search of available records.
Approval of these plans and specifications by the city does not constitute a representation as to the accuracy or the completeness of the list. The contractor shall re-establish or protect all monuments, centerline ties, corner ties, and any other survey markers within the project limits, regardless of their appearance on this list. No additional compensation shall be made for monuments, centerline ties, corner ties, and any other survey markers being re-established or protected that were not included in this list.
Section 3-10 is amended by adding thereto the following new Subsection 3-10.5 Payment Measurement and Payment for Re-establish monuments, centerline ties, corner ties, and any other survey markers shall be at each (EA) unit price and shall include, but not be limited to, surveying service, re-establishing monuments, centerline ties, corner ties, and any other survey markers, all labor, materials, equipment, and incidentals required to complete, and no additional compensation will be made therefor. Replacement of monuments, centerline ties, corner ties, and any other survey monuments includes the filing of any required documentation with the County.
Construction survey necessary to complete construction are to be included with the bid item requiring the construction survey and no additional compensation shall be made therefor.
SPC25-11 E-9
Add the following:
The Contractor shall be responsible for all survey and layout of work.
The line and grades for construction will be parallel to and offset from the position of the work. From the established lines and grades, the Contractor shall extend the necessary lines and grades for construction of the work and shall be responsible for the correctness of same. 3-12 WORK SITE MAINTENANCE
3-12.1 General
Add the following Subsection:
3-12.1.1 WORK AREA APPEARANCE
The Contractor shall maintain a neat appearance to the Work.
All unsuitable construction materials and rubbish and debris shall be regularly removed from the job site, be transported to a suitable location, and be disposed of in a proper and legal manner.
In any area visible to the public, the following shall apply:
1. Broken concrete and debris developed during clearing and grubbing shall be disposed of weekly.
2. The Contractor shall furnish trash bins for all debris from structure construction. All debris shall be placed in trash bins daily.
3. Forms or false work that are to be re-used shall be neatly stacked concurrent with their removal.
4. Forms and false work that are not to be re-used shall be disposed of with their removal.
5. Wash down from concrete trucks shall be at one location. Concrete from wash down procedures shall be removed from the site weekly.
3-12.3 NOISE CONTROL
Add the following:
A noise level limit of 85 dba at a distance of fifty (50) feet shall apply to all construction equipment on or related to the job, whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases where required for the protection of personnel.
The Contractor shall arrange and maintain a secure storage site for all equipment and materials. All equipment and unused materials shall be returned to this site at the end of each work day. 3-12.6 WATER POLLUTION CONTROL
3-12.6.1 General
Add the following:
This item shall consist of preparation, implementation and compliance with a storm water pollution prevention plan (SWPPP) for the project, if applicable.
SPC25-11 E-10
3-12.6.2 BEST MANAGEMENT PRACTICES (BMPs)
Add the following:
All storm water pollution prevention measures shall be in accordance with the submitted SWPPP. In the event circumstances during the course of construction require changes to the original SWPPP, a revised plan shall be promptly submitted to the Agency’s representative in each instance. No responsibility shall accrue to the Agency as a result of the plan or as a result of knowledge of the plan. All work installed by the Contractor in connection with the SWPPP but not specified to become a permanent part of the project shall be removed and the site restored in so far as practical to its original condition prior to completion of construction or when directed by the Agency’s representative. 3-12.6.5 PAYMENT
Add the following:
Unless otherwise indicated in the Special Provision, measurement and payment for Storm Water Pollution Prevention Measures, as described herein, shall be included in the bid item Site Maintenance. Such payment shall be considered full compensation for all labor, materials, tools, and equipment for completion, and implementation and compliance with the SWPPP. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY
3-13.3 WARRANTY
Add the following:
The Contractor shall warrant and guarantee the entire Work and all parts thereof, including that performed and constructed by subcontractors, and others employed directly or indirectly on the Work, against faulty or defective materials, equipment or workmanship for the maximum period provided by law. In addition thereto, for a period of one (1) year commencing on the date of acceptance of the Work, the Contractor shall, upon the receipt of notice in writing from the Agency, promptly make all repairs arising out of defective materials, workmanship or equipment and bear the cost thereof. The Agency is hereby authorized to make such repairs and the Contractor and Surety shall bear the cost thereof if, ten (10) days after the giving of such notice to the Contractor, the Contractor has failed to make or undertake with due diligence the repairs; provided, however, that, in the case of an emergency where, in the opinion of the Agency, delay could cause serious loss or damage, repairs may be made without notice being sent to the Contractor or Surety, and all expense in connection therewith shall be charged to the Contractor and Surety.
For the purpose of this article “Acceptance of the Work” shall mean the acceptance of the Work by the Agency in accordance with Subsection 3-13.2 but not for the purpose of extinguishing any covenant or agreement or agreement on the part of the Contractor to be performed or fulfilled under this Contract, which has not in fact been performed or fulfilled at the time of such acceptance all of such covenants and agreements, shall continue to be binding on the Contractor until they have been fulfilled.
The effective date of Acceptance of the Work and commencement of the Guarantee shall be the date of acceptance of the Notice of Completion by the City Council.
Add the following subsection to Subsection 3-13:
3-13.3.4 General Guaranty
The Contractor shall remedy any defects in the Work and pay for any damage to other work resulting therefrom, which shall appear within a period of one year from the date of final acceptance of the Work
SPC25-11 E-11
unless a longer period is specified. The Agency will give notice of observed defects with reasonable promptness.
SECTION 4 – CONTROL OF MATERIALS
4-1 GENERAL
Add the following:
The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire Work will meet all requirements of this Contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the Agency, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one year after the date of recordation of the Notice of Completion. Within this one year period, the Contractor shall also restore to full compliance with the requirements of this Contract any portion of the Work which is found not to meet those requirements. The Contractor shall defend, indemnify, and hold the Agency, its officers, agents, and employees harmless from claims of any kind due to injuries or damages arising, directly or indirectly, from said defects or noncompliance.
The Contractor shall make all repairs, replacements, and restorations within thirty-five (35) days after the date of the Engineers’ written notice.
If, in the opinion of the Engineer, the defective work is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if, in the opinion of the Engineer, the removal of such work is impractical or will create conditions which are dangerous or undesirable, the Agency shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but will make such deductions thereof in the payments due or to become due to the Contractor as the Agency may deem just and reasonable.
4-4 TESTING
Replace the third and fourth sentences of the first paragraph with the following:
Except as elsewhere specified, the Agency will bear the cost of testing material and/or workmanship which meet or exceed the requirements indicated in the Standard Specifications and the Special Provisions. The Contractor shall bear the cost of all other tests, including the retesting of material or workmanship that fails to pass the first test.
4-6 TRADE NAMES
Replace the third sentence of the second paragraph with the following:
Approval of equipment and materials offered as equivalents to those specified must be obtained prior to the opening of bids as set forth in the Instructions to Bidders.
Add the following:
Along with information supplied by the Contractor regarding equivalency of the proposed item, the Contractor shall clearly identify all deviations from the specified item. Deviations discovered by the Engineer after acceptance of an “or equal” item which were not identified by the Contractor with his/her submittal shall be cause for rejection of the “or equal” item. Contractor shall be due no additional compensation in time or money for acceptance or rejection of a proposed “or equal” item and subsequent replacement with the item specified. Contractor shall pay cost to Agency for items requiring more than
SPC25-11 E-12
two submittals and analysis of any shop drawing which requires more than a general review of an “or equal” item.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-3 LABOR
5-3.1 General
Add the following:
The Contractor shall ensure unlimited access to the job site for all Equal Opportunity Compliance officers.
Every Contractor and Subcontractor shall keep an accurate record showing the name, occupation, and the actual per diem wages paid to each worker employed by him/her in connection with the public work. The record shall be kept open at all reasonable hours to the inspection of the body awarding the Contract and to the Division of Labor Law Enforcement.
Add the following Subsection:
5-3.4.1 OVERTIME AND SHIFT WORK
The Contractor may establish overtime and shift work as a regular procedure only with the written permission of the Engineer. Such permission may be revoked at any time. No work other than overtime and shift work established as a regular procedure shall be done between the hours of 4:00 p.m. and 9:00 a.m., nor on Saturdays, Sundays or legal holidays, except such work as is necessary for the proper care and protection of the work already performed or except in case of an emergency.
All costs for overtime inspection, except those occurring as a result of overtime and shift work established as a regular procedure, shall be paid by the Contractor. Overtime inspection shall include inspection required during holidays observed by the AGC and Trade Unions, Saturdays, Sundays, and any weekday between the hours of 4:00 p.m. and 9:00 a.m.. Such costs will include but will not necessarily be limited to engineering, inspection, general supervision and other overhead expenses that are directly chargeable to the overtime work. The Agency shall deduct all such charges from payments due the Contractor. 5-4.2 GENERAL LIABILITY INSURANCE
Replace Subsection 5-4.2 with the following:
5-4.2.1 GENERAL. CONTRACTOR and AGENCY agree that Agency, its employees, agents and officials should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys fees, litigation costs, defense costs, court costs or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to the Agency. CONTRACTOR acknowledges that AGENCY would not have entered into this Agreement in the absence of the commitment of CONTRACTOR to indemnify and protect AGENCY as set forth here.
5-4.2.2 To the full extent permitted by law, CONTRACTOR shall defend, indemnify and hold harmless AGENCY, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged, or threatened, actual attorneys fees incurred by AGENCY, court costs, interest, defense costs including expert witness fees and any other costs or expenses of any kind whatsoever
SPC25-11 E-13
without restriction or limitation incurred in relation to, as a consequence of, arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part to the performance of this Agreement. All obligations under this provision are to be paid by CONTRACTOR as they are incurred by the AGENCY. 5-4.2.3 Without affecting the rights of AGENCY under any provision of this agreement or this section, CONTRACTOR shall not be required to indemnify and hold harmless AGENCY as set forth above for liability attributable to the sole fault of AGENCY, provided such sole fault is determined by agreement between the parties or the findings of a court of competent jurisdiction.
This exception will apply only in instances where the AGENCY is shown to have been solely at fault and not in instances where CONTRACTOR is solely or partially at fault or in instances where AGENCY’s fault accounts for only a percentage of the liability involved. In those instances, the obligation of CONTRACTOR will be all-inclusive and AGENCY will be indemnified for all liability incurred, even though a percentage of the liability is attributable to the conduct of the AGENCY. 5-4.2.4 CONTRACTOR acknowledges that its obligation pursuant to this section extends to liability attributable to AGENCY, if that liability is less than the sole fault of AGENCY. CONTRACTOR has no obligation under this Agreement for liability proven in a court of competent jurisdiction or by written agreement between the parties to be the sole fault of AGENCY. 5-4.2.5 The obligations of CONTRACTOR under this or any other provision of this Agreement will not be limited by the provisions of any workers compensation act or similar act. CONTRACTOR expressly waives its statutory immunity under such statutes or laws as to AGENCY, its employees, agents and officials.
5-4.2.6 CONTRACTOR agrees to obtain executed indemnity agreements with provisions identical to those as set forth here in this section from each and every subcontractor, sub-tier contractor or any other person or entity involved by, for, with or on behalf of CONTRACTOR in the performance or subject matter of this Agreement. In the event CONTRACTOR fails to obtain such indemnity obligations from others as required here, CONTRACTOR agrees to be fully responsible according to the terms of this section.
5-4.2.7 Failure of AGENCY to monitor compliance with these requirements imposes no additional obligations on AGENCY and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend AGENCY as set forth herein is binding on the successors, assigns or heirs of CONTRACTOR and shall survive the termination of this Agreement or this section. 5-4.2.8 CONTRACTOR agrees to provide insurance in accordance with the requirements as set forth here. If CONTRACTOR uses existing coverage to comply with these requirements and that coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so. The following coverages will be provided by CONTRACTOR and maintained on behalf of AGENCY and in accordance with the requirements set forth herein. 5-4.2.9 Commercial General Liability/Umbrella Insurance. Primary insurance shall be provided on ISOCGL form No. CG 00 01 11 85 or 88. Total limits shall be not less than two million dollars ($2,000,000.00) per occurrence for all coverages and two million dollars ($2,000,000.00) general aggregate. AGENCY and its officers, agents and employees shall be named as additional insureds using ISO additional insureds endorsement form CG 20 10 11 85 (in no event will AGENCY accept an endorsement form with an edition date later than 1990). Coverage shall apply on a primary noncontributing basis in relation to any other insurance or self-insurance, primary or excess, available to AGENCY or any employee or agent of AGENCY. Coverage shall not be limited to the vicarious liability or supervisory role of any additional insured. Umbrella Liability Insurance (over primary) shall apply to bodily injury/property damage, personal injury/advertising injury, at a minimum, and shall include a “drop down” provision providing primary coverage above a maximum of $25,000.00 self-insured
SPC25-11 E-14
retention for liability not covered by primary policies but covered by the umbrella policy. Coverage shall be following form to any underlying coverage. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion.
Policies shall have concurrent starting and ending dates.
Each policy of insurance shall contain a clause prohibiting cancellation, modification or lapse without thirty (30) days prior written notice having been given to the City. All insurance policies shall be subject to approval by the City Attorney and certificates evidencing such policies shall be provided to the City concurrently with the filing of all required bonds.
5.4.2.10 Business Auto/Umbrella Liability Insurance. Primary coverage shall be written on ISO Business Auto Coverage form CA 00 01 06 92 including symbol 1 (Any Auto). Limits shall be no less than two million dollars ($2,000,000.00) per accident. Starting and ending dates shall be concurrent. If CONTRACTOR owns no autos, a non-owned auto endorsement to the General Liability policy drafted above is acceptable.
5-4.3 WORKERS’ COMPENSATION INSURANCE
Replace Subsection 5-4.3 with the following:
5-4.3.1 Workers’ Compensation/Employers’ Liability shall be written on a policy form providing workers’ compensation statutory benefits as required by law. Employers’ liability limits shall be no less than one million dollars per accident or disease. Employers’ liability coverage shall be scheduled under any umbrella policy described above. Unless otherwise agreed, this policy shall be endorsed to waive any right of subrogation as respects the AGENCY, its officers, agents or employees. 5-4.3.2 CONTRACTOR and AGENCY further agree as follows:
5-4.3.2.1 This Section supersedes all other sections and provisions of this Agreement to the extent that any other section or provision conflicts with or impairs the provisions of this Section. 5-4.3.2.2 Nothing contained in this Section is to be construed as affecting or altering the legal status of the parties to this Agreement. The insurance requirements set forth in this Section are intended to be separate and distinct from any other provision in this Agreement and shall be interpreted as such. 5-4.3.2.3 All insurance coverage and limits provided pursuant to this Agreement shall apply to the full extent of the policies involved, available, or applicable. Nothing contained in this Agreement or any other agreement relating to the AGENCY or its operations limits the application of each insurance coverage.
5-4.3.2.4 Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only and is not intended by any party to be all-inclusive, or to the exclusion of other coverage, or a waiver of any type.
5-4.3.2.5 For purposes of insurance coverage only, this Agreement shall be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement.
5-4.3.2.6 All general or auto liability insurance coverage provided pursuant to this Agreement, or any other agreements pertaining to the performance of this Agreement, shall not prohibit CONTRACTOR, and CONTRACTOR’s agents, officers or employees from waiving the right of subrogation prior to a loss.
Contractor hereby waives all rights of subrogation against AGENCY.
SPC25-11 E-15
5-4.3.2.7 Unless otherwise approved by AGENCY, CONTRACTOR’s insurance shall be written by insurers authorized to do business in the State of California and with a minimum “Best’s” Insurance Guide rating of “A+VIII.” Self-insurance will not be considered to comply with these insurance specifications.
5-4.3.2.8 In the event any policy of insurance required by this Agreement does not comply with these requirements or is canceled and not replaced, AGENCY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by AGENCY will be promptly reimbursed by CONTRACTOR. Upon CONTRACTOR’s failure to make such reimbursement within 30 days of written demand, AGENCY may deduct that sum from any monies due CONTRACTOR hereunder or otherwise. 5-4.3.2.9 CONTRACTOR agrees to provide evidence of the insurance required herein, satisfactory to AGENCY, consisting of certificate(s) of insurance evidencing all of the coverages required and an additional insured endorsement to CONTRACTOR’s general liability and umbrella liability policy (if any) using ISO form CG 20 10 11 85. Certificate(s) are to reflect that the insurer will provide 30 days’ notice of any cancellation of coverage. CONTRACTOR agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions. CONTRACTOR agrees to provide complete copies of policies to AGENCY upon request. 5-4.3.2.10 CONTRACTOR shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Such proof shall be furnished within 72 hours of the expiration of the coverages. 5-4.3.2.11 Any actual or alleged failure on the part of AGENCY or any other additional insured under these requirements to obtain proof of insurance required under this Agreement in no way waives any right or remedy of AGENCY or any additional insured, in this or any other regard. 5-4.3.2.12 CONTRACTOR agrees to require all subcontractors or other parties hired for this project to provide general liability insurance naming as additional insureds all parties to this Agreement.
CONTRACTOR agrees to obtain certificates evidencing such coverage and make reasonable efforts to ensure that such coverage is provided as required here. CONTRACTOR agrees to require that no contract used by any subcontractor, or contracts CONTRACTOR enters into on behalf of AGENCY, will reserve the right to charge back to AGENCY the cost of insurance required by this Agreement.
CONTRACTOR agrees that upon request, all agreements with subcontractors or others with whom CONTRACTOR contracts on behalf of AGENCY will be submitted to AGENCY for review. Failure of AGENCY to request copies of such agreement will not impose any liability on AGENCY, its officers, agents, or employees.
5-4.3.2.13 If CONTRACTOR is a Limited Liability Company, general liability coverage must be amended so that the Limited Liability Company and its Managers, Affiliates, employees, agents and other persons necessary or incidental to its operations are insureds. 5-4.3.2.14 CONTRACTOR agrees to provide immediate notice to AGENCY of any claim or loss against CONTRACTOR that includes AGENCY as a defendant. AGENCY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims.
5-7 SAFETY
Add the following:
SPC25-11 E-16
At the pre-construction meeting, the Contractor shall submit his/her complete construction schedule to the Engineer for approval. The Contractor shall submit requests for changes in the schedule to the Engineer for approval at least forty eight (48) hours prior to the scheduled Work.
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
Add the following:
Prior to issuing the Notice to Proceed, the Engineer will schedule and conduct a pre-construction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures. 6-2 PROSECUTION OF THE WORK
Replace the last sentence of first paragraph with the following:
Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer to do so, the Agency may suspend the work in whole or in part, until the Contractor takes said steps at no cost to the Agency.
Add the following:
The Contractor shall submit monthly progress reports to the Engineer by the tenth day of each month.
The report shall include an updated construction schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
The Contractor shall provide the following:
(1) The Contractor must place concrete within 3 working days after the removal of existing concrete.
Asphalt Concrete pavement replacement at driveways shall be installed within 3 calendar days of pouring concrete.
(2) AC pavement replacement shall be installed the same day as removals are performed. (3) The Contractor shall clean up all rubble/debris piles daily. (4) The Contractor shall not commence any cold milling operation more than 3 calendar days ahead of paving.
(5) Cat track striping shall be performed within 24 hours of paving on all streets. Permanent striping shall be performed within 72 hours of cat tracking
(6) Manhole frames and covers to be raised shall be raised and patched with ARHM within 3 calendar days of final day of ARHM overlay paving.
FAILURE OF THE CONTRACTOR TO COMPLY WITH THE AFOREMENTIONED WORK SCHEDULING REQUIREMENTS, (1)-(7), DUE TO CONDITIONS UNDER HIS CONTROL WILL RESULT IN DAMAGES BEING SUSTAINED BY THE AGENCY. SUCH DAMAGES ARE, AND WILL CONTINUE TO BE, IMPRACTICAL AND EXTREMELY DIFFICULT TO DETERMINE.
FOR EACH DAY THE CONTRACTOR FAILS TO CONFORM TO THESE REQUIREMENTS, THE
SPC25-11 E-17
CONTRACTOR SHALL PAY TO THE AGENCY, OR HAVE WITHHELD MONIES DUE TO HIM THE SUM OF ONE THOUSAND THREE HUNDRED DOLLARS ($1,300.00), AS LIQUIDATED DAMAGES FOR EACH CALENDAR DAY.
6-3 TIME OF COMPLETION
Add the following subsection:
6-3.3 WORKING DAY
The Contractor’s activities shall be confined to the hours between 9:00 a.m. and 4:00 p.m. Monday through Friday. In addition, the Contractor shall not perform any Work on Saturday, Sunday, or on Agency-designated holidays. Agency-designated holidays are listed in TABLE 1 – AGENCYDESIGNATED HOLIDAYS below. Deviation from these hours will be permitted upon approval of the Engineer, except in emergencies involving immediate hazard to persons or property.
Deviations from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. Service fees will be calculated at overtime rates including benefits, overhead, and travel time; and will be deducted from the amounts due the Contractor.
Failure of the Contractor to adhere to working day requirements will result in damages being sustained by the City. Such damages are, and will continue to be, impracticable and extremely difficult to determine.
For each OCCURRENCE of a working day or hours violation, as provided herein, the Contractor shall pay to the Agency, or have withheld from monies due to it, the sum of $1,000.00.
TABLE 1 – AGENCY-DESIGNATED HOLIDAYS
New Year’s Day
Martin Luther King, Jr. Day
President’s Day
Memorial Day
Independence Day
Juneteenth Day
Labor Day
Veteran’s Day
Thanksgiving Day
Day after Thanksgiving
Christmas Eve
Christmas Day
EXECUTION OF THE CONTRACT SHALL CONSTITUTE AGREEMENT BY THE AGENCY AND CONTRACTOR THAT $1,000 PER VIOLATION IS THE MINIMUM VALUE OF THE COST AND
ACTUAL DAMAGED CAUSED BY FAILURE OF THE CONTRACTOR TO LIMIT
PERFORMANCE OF THE WORK BETWEEN THE ALLOTTED TIMES, THAT SUCH SUM SHALL
NOT BE CONSTRUED AS A PENALTY, AND THAT SUCH SUM MAY BE DEDUCTED FROM PAYMENTS DUE THE CONTRACTOR IF SUCH DELAY OCCURS.
6-4 DELAYS AND EXTENSION OF TIME
6-4.1 GENERAL
Add the following Subsections:
SPC25-11 E-18
6-4.1.1 Notice of Delays
Whenever the Contractor foresees any delay in the prosecution of the work, and in any event immediately upon the occurrence of any delay which the Contractor regards as unavoidable, he/she shall notify the Engineer in writing of the probability of the occurrence of such delay and its cause so that the Engineer may take immediate steps to prevent, if possible, the occurrence or continuance of the delay, or, if prevention is not possible, may determine whether the delay is to be considered avoidable or unavoidable, how long it continues, and to what extent it will delay the prosecution and completion of the work. It will be concluded that any and all delays which have occurred in the prosecution and completion of the work have been avoidable delays, except such delays as shall have been called to the attention of the Engineer at the time of their occurrence and found by him/her to have been unavoidable. The Contractor shall make no claims for any delay not called to the attention of the Engineer at the time of its occurrence as an unavoidable delay.
6-4.1.2 Avoidable Delays
Avoidable delays in the prosecution or completion of the work shall include all delays which in the opinion of the Engineer would have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor of his/her subcontractors. The following shall be considered avoidable delays within the meaning of the contract: 1) Delays in the prosecution of parts of the work which may in themselves be unavoidable but do not necessarily prevent or delay the prosecution of other parts of the work or the completion of the whole work within the time herein specified; 2) Reasonable loss of time resulting from the necessity of submitting samples of materials and drawings to the Engineer for approval and from performing tests of materials, measurements, and inspections; 3) Reasonable interference of other contractors employed by the Agency and/or other contractors working in the area which do not necessarily prevent the completion of the whole work within the time agreed upon; 4) Delays resulting from inaccurate or incomplete shop drawing submittals; and 5) Interference of other contractors performing concurrent work.
6-4.1.3 Extension of Time
In case the work is not completed in the time specified, including such extensions of time as may have been granted for unavoidable delays, the Contractor will be assessed damages for delay in accordance with Paragraph 6-9. The Agency, however, shall have the right to grant an extension of time for avoidable delay if it is deemed in his/her best interest to do so. During such extension of time, the Contractor will be charged for engineering and inspection services and other costs as provided in Paragraph 6-4.2.1 but will not be assessed damages pursuant to Paragraph 6-9. 6-4.2 EXTENSIONS OF TIME
Add the following Subsection:
6-4.2.1 Compensation to Agency for Extension of Time
Compensation for extension of time for avoidable delay granted pursuant to Paragraph 6-4.1.3 shall be the actual cost to the Agency for engineering, inspection, general supervision, and overhead expenses which are directly chargeable to the work and which accrue during the period of such extension, except that the cost of final inspection and preparation of the final estimate shall not be included. 6-4.4 WRITTEN NOTICE AND REPORT
Replace Subsection 6-4.4 with the following:
SPC25-11 E-19
Requests for an extension of time must be delivered to the Agency within ten (10) consecutive calendar days following the date of the occurrence that caused the delay. The request must be submitted in writing and must state the cause of the delay, the date of the occurrence causing the delay, and the amount of additional time requested. This shall be included as part of a revised construction schedule required in Section 6-1. Requests for extensions of time shall be supported by all evidence reasonably available or known to the Contractor, which would support the extension of time requested. Requests for extensions of time, which are not received within the time specified above, shall result in the forfeiture of the Contractor’s right to receive any extension of time requested.
If the Contractor is requesting an extension of time because of weather, he/she shall supply daily written reports to the Agency’s representative describing such weather, and the work that could not be performed that day because of such weather or conditions resulting therefrom and that he/she otherwise would have performed.
6-9 LIQUIDATED DAMAGES
Replace Subsection 6-9 Liquidated Damages with the following:
6-9 FORFEITURE DUE TO DELAY
The Contractor shall complete all or any designated portion of the Work called for under the Contract within the time set forth in Part C (Proposal) of these Specifications.
In accordance with Government Code 53069.85, and all other applicable law, the Contractor agrees to forfeit and pay the Agency the amount of One Thousand Dollars ($1000.00) per day for each and every day of unauthorized delay beyond the completion date, which shall be deducted from any monies due the Contractor. This payment shall be considered liquidated damages. Contractor agrees that such liquidated damages are reasonable under the circumstances existing at the time of execution of the contract, that such liquidated damages are to compensate Agency for losses that are difficult to measure and that such damages are not a penalty.
Failure of the Contractor to perform any covenant or condition contained in the Contract Documents within the time period specified shall constitute a material breach of this Contract entitling the Agency to terminate the Contract unless the Contractor applies for, and receives, an extension of time in accordance with the procedures set forth in Section 6-4.
Failure of the Agency to insist upon the performance of any covenant or conditions within the time period specified in the Contract Documents shall not constitute a waiver of the Contractor’s duty to complete performance within the designated periods unless the Agency has executed a waiver in writing.
The Agency’s agreement to waive a specific time provision or to extend the time for performance shall not constitute a waiver of any other time provision contained in the Contract Documents.
Failure of the Contractor to complete performance promptly within the additional time authorized in a waiver or extension of time agreement shall constitute a material breach of this Contract entitling the Agency to terminate this agreement.
The Contractor shall not be deemed in breach of this Contract and no forfeiture due to delay shall be made because of any delays in the completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor provided the Contractor requests an extension of time in accordance with the procedures set forth in Section 6-4. Unforeseeable causes of delay beyond the control of the Contractor shall include acts of God, acts of a public enemy, acts of the government, acts of the Agency, or acts of another contractor in the performance of a contract with the Agency, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and weather, or
SPC25-11 E-20
delays of subcontractors due to such causes, or delays caused by failure of the owner of a utility to provide for removal or relocation of existing utility facilities. Delays caused by actions or neglect of Contractor or his/her agents, servants, employees, officers, subcontractors, directors, or of any party contracting to perform part of all of the Work or to supply any equipment or materials shall not be excusable delays. Excusable delays (those beyond the Contractor’s control) shall not entitle the Contractor to any additional compensation. The sole recourse of the Contractor shall be to seek an extension of time.
Add the following Subsections:
6-10 DISPUTES AND CLAIMS
6-10.1 GENERAL
Any and all decisions made on appeal pursuant to this Subsection 6-10 shall be in writing. Any “decision” purportedly made pursuant to this Subsection 6-10 that is not in writing shall not be binding upon the Agency and should not be relied upon by the Contractor.
Nothing in this subsection shall be considered as relieving the Contractor from his/her duty to file the notice required under Subsection 6-11 or other duties required by the Contract Documents. 6-10.2 ADMINISTRATIVE REVIEW
Request for review made to the Construction Inspector or Project Engineer may be either oral or written.
Request for review made to the City Engineer shall be made in writing with supporting evidence attached.
The Contractor shall submit each request for review within twenty-one (21) calendar days of receipt of the decision that he/she is requesting.
Prior to demand for arbitration, the Contractor shall exhaust his/her administrative remedies by attempting to resolve his/her dispute or claim with Agency`s staff in the following sequence:
1. Project Engineer
2. City Engineer
Should the Project Engineer fail to address the Contractor’s request for review of a disputed decision within fourteen (14) calendar days after receiving such request, the Contractor may proceed directly to the City Engineer. At the option of the Agency, the person to whom the request for review is directed may elect to take such request to a higher level and the Contractor’s request shall be deemed to be properly submitted to such higher level.
The City Engineer shall address disputes or claims within twenty eight (28) calendar days after receiving such request and all necessary supporting data. The City Engineer’s decision on the dispute or claim shall be the Agency’s final decision.
SPC25-11 E-21
6-10.3 ARBITRATION
Claims and disputes arising under or related to the performance of the contract shall be resolved in arbitration unless the Agency and the Contractor agree in writing, after the claim or dispute has arisen, to waive arbitration and to have the claim or dispute litigated in court of competent jurisdiction. Arbitration shall be conducted, to the extent feasible, pursuant to Chapter 3 (Sections 301-393, inclusive) of Division 2 of Title 1 of the California Code of Regulations except that references therein to the “State Contract Act” shall be construed to mean “applicable law” and “Public Agency”, or “Department” shall be construed to mean “Agency” as defined in Subsection 1.2. The arbitration decision shall be decided under and in accordance with California law, supported by substantial evidence, and in writing, contain the basis for the decision, findings of fact, and conclusions of law.
Arbitration shall be initiated by a Demand for Arbitration. The Contractor shall request a Demand for Arbitration not later than one hundred eighty (180) calendar days after the date of the final written decision of the Agency on the claim or dispute.
All contracts valued at more than $15,000 between the Contractor and his/her Subcontractors and Suppliers shall include a provision that the Subcontractors and Suppliers shall be bound to the Contractor to the same extent that the Contractor is bound to the Agency by all terms and provisions of the Contract, including these arbitration provisions.
6-11 NOTICE OF POTENTIAL CLAIM
The Contractor shall not be entitled to the payment of any additional compensation for any cause, including any act, or failure to act, by the Engineer, or the happening of any event, thing or occurrence, unless the Contractor shall have given the Engineer due notice in writing, of the potential claim as hereinafter specified, provided, however, that compliance with this Subsection 6-11 shall not be a prerequisite as to any claim that is based on differences in measurements or errors of computation as to the Contract quantities.
Additionally, this Subsection 6-11 shall not supersede the specific notice and protest requirements of Subsection 2-9 “Changed Conditions” and Subsection 6-3.2 “Contract Time Accounting” respectively.
A written notice of potential claim shall set forth the reasons the Contractor believes additional compensation will or may be due, the nature of the costs involved, and, insofar as possible, the amount of the potential claim. A notice as above required must have been given to the Engineer prior to the time that the Contractor shall have performed the Work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the Engineer, or in all other cases within fifteen (15) days after the happening of the event, thing or occurrence giving rise to the potential claim.
It is the intention of this Subsection 6-11 that differences between the parties arising under and by the virtue of the Contract be brought to the attention of the Engineer at the earliest possible time in order that such matters may be settled, if possible, or other appropriate action promptly taken. The Contractor hereby agrees that he/she shall have no right to additional compensation for any claim that may be based on any such act, failure to act, event, thing or occurrence for which no written notice of potential claim as herein required was filed.
SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.2 PARTIAL AND FINAL PAYMENT
Replace the last paragraph of this subsection with the following:
SPC25-11 E-22
The closure date for period progress payments will be the twenty-fifth day of each month. Authorization to pay is commonly received on the second Wednesday of the following month. The Agency requires four to six weeks to review all progress payments, issue payment checks, present progress payment to Council for approval, and release payment to contractor. However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents. In addition, the final progress payment will not be released until the Contractor returns the control set of plans and specifications showing the as-built conditions.
The full five (5) percent retention will be deducted from all payments. The final retention will be authorized for payment thirty five (35) days after the date of recordation of the Notice of Completion.
The Contractor may substitute securities for any monies withheld by the Agency to ensure performance under the Contract as provided in Public Contract Code Sections 10263 and 22300. 7-3.3 DELIVERED MATERIALS
Replace Subsection 7-3.3 with the following:
Materials and equipment delivered but not incorporated into the Work will not be included in the estimate for progress payment.
7-3.4 Mobilization
Replace Subsection 7-3.4 with the following:
Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials.
Contractor shall provide traffic control per California Temporary Traffic Control Handbook.
Contractor must maintain access for visitors to the properties. One driveway must always remain open and accessible.
Payment for Mobilization shall be included in the other items of work and shall be considered full compensation and include but not be limited to, obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the City of Los Alamitos; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work.
SPC25-11 F-1
SECTION F
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
SPECIAL PROVISIONS
SPECIAL PROVISIONS
Except as hereinafter amended, the provisions of the 2024 Edition of the “Green Book,” Standard Specifications for Public Works Construction (“SSPWC”), with the latest Supplements, prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, and these modifications thereto are adopted as the “Standard Specifications” for the Agency. These Standard Specifications will be numbered as Sections 0 through 800 per the SSPWC.
SPC25-11 F-2
SPECIAL PROVISIONS
OAK STREET IMPROVEMENTS PROJECT
SPECIFICATION NO. CIP 24/25-03
IN THE CITY OF LOS ALAMITOS, CALIFORNIA
PART 2 - CONSTRUCTION MATERIALS
SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE
201-1.1 Requirements
201-1.1.1 General.
Add the following:
The same brand, type, and source of cement and aggregate shall be used for all portland cement concrete.
Fly ash shall not be used.
201-1.2 Materials.
201-1.2.4 Chemical Admixtures.
Add the following:
1. Retarding Densifier. The material shall be of the hydroxylated carboxylic acid type in liquid form and shall not entrain air or cause foaming. The retarding densifier shall be used in strict compliance with the printed recommendations of the manufacturer. There shall be no reduction in the cement content of the concrete mix because of the addition of the retarding densifier.
The admixture shall be such that its addition to the concrete mix will:
a. Decrease drying shrinkage;
b. Increase compressive strength for all concrete strength for all concrete ages from 3 days to 1 year;
c. Increase flexural strengths, modulus of elasticity and abrasion resistance;
d. Increase the slump and placement workability;
e. Retard the initial set and increase the density; and f. Shall contain no calcium or tri-ethanolamine.
At the discretion of the Engineer, the Contractor may be required to submit proof that the admixture he proposed to use meets the foregoing requirements. Such proof shall be in the form of comparative tests of plain and admixture containing mixes performed by an acceptable local laboratory with testing based on use of the project materials and in accordance with the requirements of ASTM C 157.
An approved admixture conforming to these requirements is plastiment retarding densifier in liquid form.
201-3 EXPANSION JOINT FILLER AND JOINT SEALANTS
SPC25-11 F-3
201-3.1 General.
Add the following:
Contractor shall submit materials to Engineer for approval. 201-3.4 Type “A” Sealant (Two-Part Polyurethane Sealant).
Replace the first paragraph with the following:
Type A Sealant shall be two component silicone sealant and shall be furnished and placed in accordance with Specifications for "Two Component, Machine Mixed, Type A Sealant" (State Specification 8030-61J-01). Submit two samples to the Engineer for approval.
201-4 CONCRETE CURING MATERIALS
201-4.1 Membrane Curing Compounds
201-4.1.1 General.
Add the following:
Concrete curing compound shall be Type 2.
SECTION 203 - BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE
203-6.1 General.
Add the following:
Asphalt concrete material used for remove and replace repairs within the roadway shall be Class and Grade B-PG 64-10.
203-11 ASPHALT-RUBBER HOT MIX (ARHM)
Subsection 203-11 ASPHALT RUBBER HOT MIX is amended by adding thereto the following paragraphs:
203-11.2 Materials.
Add the following:
Contractor shall maintain a minimum quality control plans as follows:
a) Perform sieve analysis test Caltrans Test 202 on a sample taken immediately after 300 tons of production and every 500 tons thereafter.
b) Perform binder content test Caltrans Test 382 on a sample taken immediately after 300 tons production and every 1,000 tons thereafter.
Tests shall be performed and completed without interruption directly after samples are procured at the production plant laboratory.
A copy of test results shall be provided to the Engineer immediately upon completion of each test or upon request thereafter if Engineer is not present at time of the test.
Adjustments shall be made immediately if test results indicate a need for adjustment.
SPC25-11 F-4
203-11.2.3 Crumb Rubber Modifier (CRM).
Replace the first paragraph with the following:
The material shall consist of a combination of scrap tire CRM and high natural CRM meeting the requirements of this subsection. Scrap tire CRM shall consist of ground or granulated rubber derived from any combination of automobile tires, truck tires or tire buffing. Whole scrap tire rubber shall be derived from scrap tires generated entirely within the State of California, and the certification of compliance shall so certify.
The high natural rubber shall be a single source material and not a blend of more than one source.
The high natural CRM and CRM rubber components shall not be pre-mixed prior to mixing with paving asphalt.
The percentage of high natural CRM shall be equal to 1000 divided by the percentage of natural rubber in the high natural CRM (using whole number percentages), e.g., 1000/40% equals 25 percent. The remainder of CRM shall be scrap tires.
The maximum value for Natural Rubber Content in Table 203-11.2.3.1(B) is hereby deleted.
Delete the sixth (last) paragraph of Subsection 203-11.2.3.1. 203-11.2.4 Aggregate.
Replace this section with the following:
The aggregate for ARHM shall conform to the “quality requirements” for asphalt concrete Type A as specified in Caltrans Standard Specifications.
All aggregate used for ARHM shall be crushed aggregate.
Any change in source of aggregate supply requires 2 weeks advance notice in writing to the Engineer, and submittals and testing in conformance with specifications for a new mix design. No single bin shall receive aggregate from more than one source. Contractor shall provide a copy of aggregate delivery tickets for aggregate delivered for use on the project. 203-11.3 Composition and Grading.
Add the following:
Asphalt-rubber hot-mix shall be type and class ARHM-GG-C.
Optimum binder content shall be based on Caltrans 367 procedure without modification using air voids of 4%. Once full compliance with specifications is established at 4% air voids, the binder content shall thereafter be increased to provide 3.5% voids to conform to the residential traffic in the project, all other factors being within specification.
SPC25-11 F-5
Variations of percent air voids below the minimum specified will be cause to terminate paving operations until changes to conform to the specified percent air voids are demonstrated and approved by the Engineer.
The gradation ranges shown in Table 203-11.3, including the ¾” sieve range added herein, shall be considered the Contract Compliance Range. The Operating Range for the ½” sieve shall be 94% to 99%. The Operating Range for all other sieves, except the 200 sieve, shall be 2 percentage points inside the Contract Compliance Range. If gradation test results do not meet the Operating Range requirements but meet the Contract Compliance Range, placement of ARHM may be continued for the remainder of the day.
However, another day’s work shall not be started until tests, or other information, indicate to the satisfaction of the Engineer that the next material to be used in the work will comply with the requirements specified for Operating Range. 203-11.4 Mixing Asphalt and CRM.
Add the following:
The required mixing/reaction time is hereby modified to 75 minutes minimum. The minimum reaction period shall be the time from complete incorporation of materials into the mix to the time that the asphalt-rubber meets all specifications for reacted material.
Reaction shall be considered complete only after the second of two viscosity readings taken 15 minutes apart is less than the first. The Engineer’s decision shall be final for determination of the minimum reaction period.
All material shall be tested for viscosity and verified as to completer reaction prior to transfer to any storage tank or use of the reaction tank for feet to the hot mix plant.
Material reacted lower than specified temperature, but above 185 degrees C (365 F), or transferred to a storage tank prior to completion of reaction as specified, shall be reacted for a total period of 3 hours prior to use. Any such transfer shall be described in the comments column of the Asphalt Rubber Batch Log.
Each batch of binder shall be tested for viscosity after the minimum reaction time has passed and the following information shall be recorded:
-Temperature of stored asphalt cement material at time of loading -Time at which the reaction tank is fully loaded
-Tons of asphalt rubber added to the tank for the batch -Total asphalt rubber in the tank after loading
-The beginning time of reaction (Fully loaded and above 375° F) -Binder temperature at time of sampling
-Temperature of tested material
-Viscosity reading
-Time of viscosity test (All test results must be completed prior to use.) A copy of the Asphalt Rubber Batch Log shall be provided to the Engineer upon request.
A copy of the batch log sheet and all circle charts for the day shall be faxed to the Engineer within 12 hours of ending production of ARHM for the day. (A log sheet form will be provided at the preconstruction meeting.)
SPC25-11 F-6
Construction shall be considered unauthorized until Contractor has faxed the log to the Engineer as arranged at the preconstruction meeting and has in his possession a fax confirmation sheet with a time and date conforming to specification. Under any circumstances, Engineer must be contacted for clearance to pave. 203-11.5 Equipment for production of Asphalt-Rubber.
Add the following to Item C) of 203-11.5:
Reaction Tank. The asphalt-rubber material shall be held in a reaction tank separate from the storage tank feeding the ARHM plant, until the reaction is complete. The reaction tank shall have agitation sufficient to increase the viscosity of the mixture to a peak viscosity reading at least 20 percent higher than the viscosity reading of the material measured at a time that the material otherwise meets specifications for reacted material.
The time of reaction may be extended as needed to produce this result. It shall be the responsibility of the Contractor to demonstrate to the Engineer through viscosity readings at appropriate times that the equipment conforms to these requirements. If this cannot be demonstrated, the reaction time shall be 3 hours. Once established, the reaction time shall be the minimum time for reaction unless there are changes in materials or equipment, in which case a new reaction time shall be established per specifications. The Engineer's decision shall be final.
The reaction tank shall have a functioning paper circle chart thermometer device, which shall record tank temperatures whenever asphalt rubber is in any stage of production.
Seven days before production of asphalt rubber starts, the Contractor shall provide the Engineer approximately double the number of charts estimated to be needed to produce the necessary binder quantity. These charts will be numbered and signed by the Engineer and returned to the Contractor prior to start of production. These signed and numbered charts shall be used throughout production of the asphalt rubber binder. Charts shall be used in the consecutive order as numbered by the Engineer beginning with number one, and shall be returned weekly after use to the Engineer. Charts will be identified with the date they were used by the Contractor at time of installing on the equipment, and shall be identified as to the tank to which they were attached. Production of asphalt rubber shall be terminated if this procedure is not followed and will not be restarted until Contractor demonstrates to the Engineer that it is capable of complying with this requirement.
At the start of each production day, the paper chart shall be replaced with a new signed, dated and numbered sheet, the lead scribe shall be sharpened or ink well filled, and the circle chart shall be calibrated against a sample of material drawn early from the first batch of the day. Any calibration adjustments shall be recorded in the appropriate space provided on the batch log sheet. A spare functional circle chart device shall be at the plant at all times for immediate installation should failure occur on a circle chart device being used. Calibration shall be performed as part of such installation. The lack of a functional circle chart device on the reaction tank shall be cause to terminate production of asphalt rubber binder. A blunt lead scribe or low ink, or a paper chart used on a prior day will be considered to render the device non-functional.
Storage Tank. After a complete reaction is verified by viscosity readings acceptable to the Engineer, the material shall be held in a storage tank that is fully isolated from material that is not fully reacted. This tank shall be the only tank feeding the ARHM
SPC25-11 F-7
plant. No material shall be transferred to the storage tank feeding the plant until reaction is complete in the reaction tank.
SECTION 211 - MATERIAL TESTS
211-1 COMPACTION TESTS.
211-1.1 Laboratory Maximum Density.
Add the following:
Laboratory maximum density tests shall be performed in accordance with Test Method No. Calif. 216G, Part II. The correction for oversized material as stated in Test Method No. Calif. 216 shall be replaced with Note 2 of ASTM D1557. 211-1.2 Field Density.
Add the following:
Field density tests will be made by the Engineer during the course of construction at the expense of the CITY. If field density tests indicate that any portion of the compacted subgrade has density lower than that specified, the Contractor shall rework that portion until the specified density is obtained. Retest of areas which have failed compaction will be performed by the Engineer at the Contractor's expense.
SPC25-11 F-8
PART 3 - CONSTRUCTION METHODS
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING
300-1.1 General.
.1 General.
Add the following:
In addition to the work outlined in Subsection 300-1 of the Standard Specifications, the following items of work are included in other bid items and no additional payment will be made therefore.
(1) Maintain dust control at all times by watering; including developing a water supply and furnishing and placing all water required for work done in the contract, including water used for extra work and water used for irrigation purposes.
(2) Protection of utilities, trees, fences, walls and other facilities within the construction zone, except those specifically directed by the Engineer to be removed or relocated.
(3) Clearing and removal of debris from site of work.
(4) Removal of structures, as directed by Engineer to be removed or abandoned. (5) Delay in work necessary to accommodate utility relocations by others. (6) Other items of work as directed in Appendix Part II, Mitigation Monitoring and Reporting Program.
(7) Other items of work as directed in these specifications. 300-1.3 Removal and Disposal of Material.
300-1.2 Root Pruning and Tree Trimming.
Add the following:
Tree branches which hang within 13.5 feet above finished roadway grade or within 9 feet above finished sidewalk or parkway grade shall be removed to the branch collar in accordance with the current pruning standards of the International Society of Arboriculture (ISA). The Contractor shall remove additional tree branches, under the direction of the Engineer, in such a manner that the tree will present a balanced appearance. No paint or tree sealant shall be applied to the resulting scars. All pruning shall be done under the supervision of an ISA Certified Arborist in the Contractor’s employ.
ll be done under the supervision of an ISA Certified Arborist in the Contractor’s employ. l be done under the supervision of an ISA Certified Arborist in the Contractor’s employ.
SPC25-11 F-9
All the root pruning required to place or replace walks, or other permanent facilities shall be limited to the minimum amount necessary to set forms.
All roots 2 inches and larger shall be cut with sharp tool such as axe or chainsaw. No roots shall be broken off by trenching or other heavy equipment.
No root shall be removed within five (5) diameters of the tree trunk measured at 4 feet, 9 inches above grade without the express written permission of the City. Any such root removed without the City’s written permission may create a hazardous condition for which the Contractor shall be liable.
Should the Contractor create a hazardous condition in the sole judgment of the Engineer the Contractor shall remove the tree and replace it with a specimen of the same species and value at the Contractor’s expense.
All significant root pruning (3-inch diameter and larger) shall be performed under the direct supervision of an ISA Certified Arborist in the Contractor’s employ.
All trees noted on the drawings for tree pruning shall have crown reduction and crown thinning performed in accordance with standards published by the Western Chapter of the International Society of Arboriculture (ISA). All pruning shall be performed by ISA certified tree workers under direct supervision of an ISA certified arborist. The Contractor shall furnish such credentials to the Engineer prior to commencement of any tree work.
Add the following Subsection 300-1.2.1:
300-1.2.1 Protection of Existing Trees to Remain.
All trees to remain in place within the limits of work shall be protected from damage by workmen, equipment, and operations. Insofar as prosecution of the work allows, following removal of surrounding pavements, etc., the root area beneath the tree drip line shall be protected from damage, including compaction.
Protection shall include temporary fencing, barricades, etc. Warning tape will not be considered sufficient.
300-2 UNCLASSIFIED EXCAVATION
300-2.1 General.
Replace the first paragraph with the following:
Unclassified excavation shall consist of all excavation, including roadways, all types of bituminous pavement, and concrete pavement, curb, walk, gutters, cross gutters, driveways, and access ramps. Removals shall be in accordance with Section 401 Removals.
300-2.9 Payment.
Replace the first sentence with the following:
SPC25-11 F-10
Payment for unclassified excavation performed as part of the work for “remove and construct” bid items, shall be paid for as part of the work for that item, and no additional compensation will be allowed.
300-4 UNCLASSIFIED FILL
300-4.1 General.
Add the following:
The site shall be graded to the limit lines and elevations shown on the drawings with such allowances as may be required for the construction of walks, and other site improvements. Tolerance for rough grading is 1/10th of a foot (30mm), plus or minus, at drainage swales, building pads, and paved areas. At other areas, appearance shall be the governing factor.
Finish grades shall slope to drain without water pockets or irregularities and shall conform to the intent of all plans and sections, after thorough settlement, and compaction of the soil. Finished grades shall meet all existing or established controls of sidewalks, curbs, and walls and shall be of uniform slope and grade between points of fixed elevations or elevation controls from such point to established grades. Tolerance for finish grading is ¼ inch (6mm), plus or minus.
Make-up fill material in landscaped areas shall be Class A topsoil for the upper 12 inches of fill.
300-4.10 Payment.
Replace this subsection with the following:
Full compensation for furnishing all labor, materials, tools and equipment, and doing all the work involved in unclassified fill construction shall be considered as included in the price paid for “construct” bid item and shall include full compensation for the cost of all grading, shaping, compacting or consolidating and extra fill, if required, or other work that is required under this subsection. No additional payment will be made for unclassified fill.
302-4 SLURRY SEAL SURFACING
302-4.1 GENERAL
Replace paragraph 1 with the following:
Slurry Seal shall consist of the mixing, spreading and application of emulsion-aggregate slurry (EAS) conforming to 302-4.3. The combined aggregate gradation of the slurry seal mixture (EAS) shall be as specified in the special provisions. 302-4.3.2.1 Aggregate.
The text of Subsection 302-4.3.2.1 of the Standard Specifications is hereby deleted and replaced with the following:
SPC25-11 F-11
Aggregate shall be Type II conforming to 200-1.7.
302-4.5.1 General.
Add the following:
The slurry mixer shall be a multiblade or spiral continuous-flow in good working condition capable of accurately delivering a predetermined proportion of aggregate, water, emulsion, additive and asphalt modifier to the mixer and of discharging the thoroughly mixed slurry on a continuous basis. Each mixer shall have a metering device to measure the quantity of water in liters (gallons) used in each load of slurry and a separate metering device or equivalent which meets the approval of the Engineer to measure the quantity of emulsified asphalt used in each load of slurry.
The mixing shall be performed by a continuous-flow mixer. All aggregate particles will be uniformly saturated and coated with asphalt.
The spreader box shall be equipped with flexible material in contact with the pavement and shall be maintained so as to prevent loss of slurry. It shall be adjustable to ensure a uniform controlled spread and be equipped with a mechanical or hydraulic type horizontal shifting device.
302-4.8 Spreading and Application.
Subsection 302-4.8 Spreading and Application is hereby amended thereto by adding the following paragraphs:
The sites for stockpiling and batching materials shall be clean and free from objectionable materials. Arrangements for these sites shall be the responsibility of the Contractor.
Hand squeegees and other hand equipment shall be provided to remove spillage and spread slurry in areas inaccessible to the spreader box.
The Contractor shall have two fully operational mixers for use at the project site at all times. These mixers shall be available for inspection by the Agency at least 48 hours prior to commencing work.
The application of slurry shall not commence until after 7:00 a.m. and the slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The streets to be sealed shall be closed from the time the application begins until the Engineer determines the mixture has achieved sufficient set to be opened to traffic.
Prior to applying slurry, the surface to be sealed shall be cleaned by the Contractor unless otherwise specified. Immediately ahead of the mixer, the pavement shall be prewetted by a pressure water distribution system equipped with a fog-type spray bar which will completely fog the surface of the pavement. The need for application and the rate of application will be determined by the Engineer.
SPC25-11 F-12
Evidence of solidification of the asphalt, balling or lumping of the aggregates, or the presence of uncoated aggregate will be cause for rejection of the slurry.
Slurry shall be applied in such a manner that no ridges shall remain.
The Contractor shall prevent slurry from being deposited on other than asphalt concrete surfaces and shall remove slurry from surfaces not designated to be sealed at no cost to the Agency. The method of slurry removal shall be approved by the Engineer.
At the direction of the Engineer, the Contractor shall repair and reseal all areas of the streets which have not been sealed properly or completely, at no cost to the Agency.
Where the completed slurry is not uniform in color, the street shall be treated to eliminate the color variation at the Contractor's expense. The method of treatment shall be approved by the Engineer.
302-4.8.2.2 Aggregate Application Rate.
Add the following:
The work shall consist of mixing asphaltic emulsion, aggregate, additive, and water and spreading the mixture on the pavement where shown on the Plans. Type II slurry shall be applied at the application rate shown in SSPWC Table 302-4.8.2.2 In addition, an Extra Long Ton of slurry is made up pf 2000 pounds (907 kg) of dry aggregate plus emulsified asphalt, accelerator or retardant, and water. Quantities and application rate shall be approved by the Engineer. When the Engineer determined that the application rate does not conform to the requirements, the Contractor shall take immediate corrective action as specified in SSPWC Section 302-4.8.2.2, Corrective Action. When the rate is less than the minimum amount required, the Contractor shall reapply additional slurry seal to the nonconforming area to meet the requirements. When the rates exceed the maximum specified Table 302-4.8.2.2, the material shall be removed and replaced, or be left in place at no additional cost to the Agency, as determined by the engineer.
302-4.11 Payment.
Payment for Slurry Seal (Type II) shall be paid at the contract price per Extra Long Ton (ELT) and shall include, but not limited to, full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the work involved in the furnishing and placing of the slurry seal including, but not limited to, cleaning the surfaces, applying waterproofing membrane, weed abatement, sealing of cracks, and protecting the slurry seal until it has set, all as shown on the roadways, as specified in these specifications and as directed by the Engineer, complete and in place, and no additional compensation will allowed therefor.
302-5 ASPHALT CONCRETE PAVEMENT
302-5.1 General. The last sentence of Subsection 302-5.1 of the Standard Specifications is hereby deleted and replaced with the following:
SPC25-11 F-13
Cracks, joints, and holes to be filled shall be cleaned after cold milling.
AC for AC pavement repairs and for PCC pavement repairs shall be placed the same day as removals are performed.
302-5.4 ASPHALT TACK COAT
Asphalt tack coat material shall be Thermoplastic Polymer Modified HPS No Track Tack (No Track Tack) by Paramount Petroleum, or an approved equal.
This item shall consist of full coverage of No Track Tack to be applied as tack coat between all contact surfaces for overlay and patch repairs. The Material is to be applied at 325 to 425 degrees F with a distributor truck at typical application rates of 0.08 to 0.15 gal/square yard. The exact application rate will be determined by surface conditions at time of application.
The Thermoplastic Polymer Modified HPS No Track Tack shall meet the following criteria:
Test Method Typical Properties Specification
Digested whole tire rubber 2 1-3
Softening Point Degree F D36 165 160 Min
Penetration @ 77 Deg. F
100g, 5 sec, Dmm
D-5 16 10 Min
Brookfield Viscosity @
275 Deg. F cPs*
D4402 975 3000 Max
Brookfield Viscosity @
350 Deg. F cPs*
D4402 185 300 Max
SECTION 302 -ROADWAY SURFACING
302-5 ASPHALT CONCRETE PAVEMENT
302-5.1 General.
Add the following:
Cracks, joints, and holes to be filled shall be cleaned after cold milling.
AC for AC pavement repairs and for PCC pavement repairs shall be placed the same day as removals are performed.
Add the following Subsection:
302-5.1.1 Preparation Crack Treatment.
A singular crack shall be considered to be a crack on the perimeter of an otherwise uncracked asphalt pavement area, a pavement block, exceeding 4 feet in minimum dimension. Such pavement area is defined by the cracks forming its perimeter. If asphalt concrete pavement is being constructed directly upon an existing asphalt concrete pavement: 1) Contractor shall spray all weeds in cracks with an approved herbicide, such
SPC25-11 F-14
as brand Roundup, a minimum of 1 week prior to paving. All weeds shall be resprayed if rain occurs within 48 hours after application; 2) all holes and cracks exceeding 1.5 inches deep by 5 inches wide by 7 inches long in all 3 dimensions shall be cleaned, tacked and filled with temporary 3/8” (cutback) asphalt concrete compacted level with the top of the existing pavement; 3) all cracks and holes with weeds shall be routed clear to a depth of one-inch; 4) All cracks and joints 1/4 inch or greater in width shall be blown clear with high pressure air; and 5) all singular cracks and joints shall be filled with Crafco Polyflex Type III or equal. Crack and joint filling shall utilize a banding type applicator (Crack banding machine or equivalent) or a “shoe” attachment on a wand, capable of spreading a band 2 to 3 inches wide over the crack, while at the same time striking off the crackfiller at a uniform thickness between 3/32 and 5/32-inch. Thickness shall not exceed 5/32-inch, but if so, crackfiller shall be reheated and replaned to the specified thickness by a method approved by the Engineer.
To ensure awareness of the specification by crackfill crew, the foreman on the crackfill work shall fill out the following certificate, have the certificate at the site of the work, and present the certificate to the inspector on request.
All crack preparation shall be performed after cold milling, and cracks in cold milled areas.
Engineer shall be notified in writing 24 to 48 hours prior to performing crack filling.
Contractor shall seal the largest singular cracks in the quantity specified below for each street segment listed herein respectively, within 15 percent above or below that amount. Quantities more than 15 percent above the amounts shown will not be paid without written authorization from the Engineer. Actual lineal footage sealed will be paid at the bid item price, subject to these provisions.
STREET LIMITS TOT. CRK
LG
CRACKFILL CREW - CERTIFICATE OF PROCEDURES
***No work shall begin without this certificate on site, signed by the foreman.*** As the on-site supervisor of the crackfill crew, I hereby certify that I am aware of and will provide for proper labor and equipment for the work as specified: " capable of spreading a band 2 to 3 inches wide over the crack, while at the same time striking off the crackfiller at a uniform thickness between 3/32 and 5/32-inch thick."
I also certify that I have verified that the crackfill material is the same material shown on the Certification of Compliance, or is the precise product identified in the specifications: Crafco Polyflex Type III Print Name:
Signed Date
SPC25-11 F-15
STREET LIMITS TOT. CRK
LG
TOTAL
302-5.4 Tack Coat.
Add the following:
This item shall consist of a Bituminous Surface Pavement Tack Coat composed of a blend of elastic Polymer modified asphalts, thermoplastic resins and digested whole tire rubber. The Material is applied at 325 to 425 degrees F with a distributor truck at typical application rates of 0.08 to 0.15 gal/square yard. The exact application rate will be determined by surface conditions at time of application.
Asphalt tack coat material shall be Thermoplastic Polymer Modified HPS No Track Tack (No Track Tack) by Marathon Petroleum, or an approved equal.
This item shall consist of full coverage of No Track Tack to be applied as tack coat between all contact surfaces for patch repairs. The Material is to be applied at 325 to 425 degrees F with a distributor truck at typical application rates of 0.08 to 0.15 gal/square yard. The exact application rate will be determined by surface conditions at time of application.
The Thermoplastic Polymer Modified HPS No Track Tack shall meet the following criteria:
Test Method Typical Properties Specification
Digested whole tire
rubber
2 1-3
Softening Point Degree F D36 165 160 Min
Penetration @ 77 Deg. F
100g, 5 sec, Dmm
D-5 16 10 Min
Brookfield Viscosity @
275 Deg. F cPs*
D4402 975 3000 Max
Brookfield Viscosity @
350 Deg. F cPs*
D4402 185 300 Max
SPC25-11 F-16
*BKF LV II, spdl #21 @ 20 RPM
The tack coat shall be applied to the existing pavement on the areas to receive the ARHM or AC, or slurry where specified. The Engineer shall approve the exact rate and number of applications. Two heavy coats of SS 1h shall be applied to vertical joints for patching. All contact surfaces with new asphalt shall be painted tack coat immediately before the asphalt concrete is placed.
The tack coat shall be applied as specified in Subsection 302-5.4 of the Standard specifications and these special Provisions. Thermoplastic Polymer Modified No Track Tack shall be applied only when the existing surface is dry and the atmospheric temperature is 50 deg. F and rising. NO material shall be applied when rain is imminent.
The Thermoplastic Polymer Modified No Track Tack shall be heated slowly to 325- 425 degrees F. At no time shall the product be heated above 450 degrees F. The product shall be applied through a distributor truck equipped with a heating unit and shall maintain tack coat at or above 325 degrees F. It shall be equipped with a full circulating spreader bar and pumping system capable of applying the Thermoplastic Polymer Modified No Track Tack material within + 0.01 gallons per square yard tolerance of specified application rate and give uniform covering of the surface to be treated. The distributor shall also include a tachometer, pressure gauge, and volume measuring device and thermometer. The application rates shall be 0.20 gallons per square yard for all slurry seal (where specified) or as otherwise directed by the Engineer.
Paving asphalt shall not be applied until the preparation of the existing surface has been completed and thoroughly cleaned, and then only so far in advance of placing the RAP Slurry as permitted by the Engineer. The No Track Tack shall not be left exposed overnight.
Existing concrete curb faces and all concrete not to be overlaid shall be protected against disfigurement from the asphalt tack coat. Residue of the material shall be removed from concrete surfaces to return the concrete to its original condition unless otherwise directed by the Engineer.
Excessive tracking of tack coat onto adjacent pavements will require immediate cleanup. If significant amounts of asphalt tack coat are tracked onto existing adjacent pavements, the contractor shall be required to clean it off to the satisfaction of the City Engineer or provide a slurry seal to restore the pavement at their own expense. This shall apply to the entirety of asphalt haul routes to and from the project sites.
On all vertical joins of AC patching, apply SS-1H tack coat uniformly in two coats of .20 gallons per square yard each with full "break" in between, or .20 gallons per square yard of HPS No Track Tack uniformly in one coat. Tack coat shall not be applied when the temperature of the surface to be tacked is below 40º F in the shade. A tack coat shall be applied at the following:
1. Pavement joins;
2. Areas where new pavement meets existing pavements;
3. Areas where lift sections from pavement placed on different days meet;
SPC25-11 F-17
4. Trenches;
5. Areas where existing striping has been sandblasted; and
6. Raised valves and manhole covers.
Payment for tack coat shall be included with the item requiring the tack coat, and no additional compensation will be made therefor.
302-5.5 Distribution and Spreading.
Add the following:
Each paving machine used will require a paving foreman for each machine along with a full set of rollers as specified and two rakers and one shoveler laborer at a minimum. 302-5.6 Rolling.
302-5.6.1 General.
Add the following:
Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint.
Rubber tire rollers shall be used on any leveling course.
Three rollers shall be provided for installation of AC greater than 200 tons per hour, regardless of thickness.
302-5.7 Joints.
Replace the first sentence of the first paragraph with the following:
Join lines between successive runs shall be within 6 inches of lane lines or center of street or a minimum of 14 feet outside of the outer most lane line or center of street, or 5 to 6 feet from a lane line or center of street and within a lane. The joint pattern for all pavement layers shall be submitted in writing to the Engineer for review and approval 2 weeks in advance of the first lift of pavement to be placed. No exceptions to the specified requirements for joints shall be anticipated, and the Engineer’s decision shall be final.
302-5.9 Measurement and Payment.
Add the following:
Compensation to provide all of the equipment to the site and operated as specified, including all rollers specified regardless of rolling pattern elected by Contractor, shall be considered included in the bid item price for AC material.
Payment Remove A.C., A.B., And Subgrade And Construct 6-Inch Full Depth Asphalt Concrete Pavement Over Compacted Base/Native shall be paid at the contract price per square foot (SF) and include full compensation for all labor, materials, tools, equipment and incidentals required to construct full depth AC
SPC25-11 F-18
pavement. This bid item will include furnishing the material, placement, compaction, saw cutting, excavation, hauling, disposal, prime coat, tack coat, asphaltic emulsion coating on vertical surfaces to abut the new pavement, grading and compaction of subgrade, and all other work required to result in an asphalt pavement meeting the requirements of the specifications.
302-9 ASPHALT-RUBBER HOT MIX (ARHM).
302-9.1 General.
Add the following:
All PCC surfaces, to be crossed by trucks used to haul ARHM, that are within 500 feet of the work limits shall be covered with sand or other durable covering prior to applying tack coat.
Contractor shall have sufficient power brooms on site during all periods of distribution and spreading to provide for cleanup of haul routes and work areas. Power broom shall provide miscellaneous cleanup of ARHM spoils as directed by the Engineer.
Power brooms used ahead of paving operations after acceptance of cold milling shall only sweep areas that are accepted as completed for cold milling. Power brooms shall not be operated more than 80 percent full of sweepings. Power brooms that have swept areas not accepted as completed for cold milling shall not enter onto areas that are accepted as completed for cold milling.
302-9.3 Distribution and Spreading.
Add the following:
The temperature of ARHM shall be high enough upon delivery that pavement temperature after two passes with the breakdown roller exceeds 290 degrees Fahrenheit (143 degrees Celsius).
To avoid picking up loose rock in the overlay area, the tires of all trucks must be lightly oiled with linseed oil or soybean oil or approved equal. Diesel fuel will not be allowed on the project at all for oil down of any equipment.
Raking of ARHM shall be eliminated as much as possible. ARHM material shall not be cast across the mat under any circumstance. Raking shall be just enough to set up edges for uniform joins without casting material. Screed controls shall be the predominant means of controlling material at joins. In areas where paving machines cannot be used due to space constraints, material shall not be thrown by shovels. Material shall be removed directly from the paving machine hopper and shall be placed directly in its final location, to be distributed with minimal raking. Material may be dumped directly from a truck, but further material distribution shall be by shovel directly to its final location with minimal raking. A small rubber tire tractor with a screed type attachment may be used to spread a pile dumped from a truck, but raking shall be minimized after spreading.
The paving machine screed shall not be pulled across an area already paved with ARHM, even adjacent to narrow areas to be paved. Such narrow areas shall have ARHM distributed by methods specified by shovel or rubber tire tractor, unless the adjacent area has hardened enough and will not be significantly marred by passing the screed over it.
SPC25-11 F-19
Even if hardened adequately, Contractor shall spread rock dust by hand tools to avoid cohesion of the ARHM in the screed to the existing surface of such areas of freshly cured ARHM.
Contractor shall maintain a functioning infrared heat measurement device in close proximity to each paving machine at all times. The infrared device shall be correlated by thermometer to the actual mat temperature prior to use. The correlation difference shall be applied to all readings thereafter. Contractor shall provide a pavement temperature reading, with an infrared heat measurement instrument, when requested by the Engineer.
Inaccessibility of a heat measurement shall be cause for termination of paving operations.
Transverse cold joints shall be provided such that longitudinal joints are not left exposed at the end of the workday.
302-9.4 Rolling.
Add the following:
Initial breakdown rolling shall be vibratory. Rolling in vibratory mode shall not be performed after ARHM material temperature falls below 290 degrees F (143 degrees C), due to disturbance of the bonds beginning to set up in the binder at lower temperatures.
An intermediate roller of the same or greater width than the breakdown roller shall be rolling directly behind the breakdown roller at all times, and paving shall cease if intermediate rolling is terminated for any reason. Additional intermediate rollers may be necessary depending on production rates.
Once a rolling pattern is elected by Contractor, the rolling pattern shall remain consistent, unless conditions change and/or a modified rolling pattern is needed to conform to specification.
All finish rolling shall be performed by a separate finish roller.
To ensure optimum quality control, the use of more than one paver will require notification 3 days in advance to the Engineer, and will generally require one foreman, one sweeper, and a full complement of rollers per Subsection 302-5 of the Standard Specifications and this Subsection 302-9.4 for each paving machine.
An extra breakdown roller shall be on site at all times, free of defects.
Add the following Subsections:
302-9.4.1 Density and Smoothness. Density and smoothness shall conform to Subsection 302-5.6.2, except the second and third paragraph of Subsection 302-
5.6.2 shall not apply to ARHM.
The compaction after rolling shall be 95 percent of density obtained with the California Kneading Compactor, California Test 304 as modified and measured in conformance to this Subsection 302-9.4.1.
The field density of compacted ARHM shall be determined by:
SPC25-11 F-20
1) A nuclear asphalt testing device, calibrated in conformance with California Test 375, except as modified in this Subsection 302-9.4.1, in the field designed to measure the density of pavement of the thickness being constructed; or
2) Core with density determined as follows:
a) Saw the ARHM lift of pavement from the top of the core approximately perpendicular to the axis of the core, just above any underlying pavement or as necessary to obtain a clean flat surface at the bottom of the sample.
b) Clean and dry the sample as described in ASTM 1188.
c) Perform California DOT Test 308 Method A step a.
d) Prior to proceeding to steps 308A b., 308A c., 308A d. and 308A e., place the core, top surface down, firmly into a flat pan of hot liquid paraffin approximately 1/4 inches deep. Allow the sample and paraffin to cool to firm solid state and remove the sample from the pan by cutting around the perimeter. Trim the edges of paraffin parallel to the side of the sample cylinder, and weigh the cylinder to obtain:
G = Mass in grams of level sealed paraffin-treated specimen in air.
e) Perform 308A b., 308A c., and 308A d on the sample from D) above.
f) Complete the remainder of Test 308A, except replace the formula in 308A e. with the following:
Bulk Specific Gravity =
In case of dispute, 1) shall be used, except Contractor may elect to use 2), but all costs for such procedures shall be borne by the Contractor to provide the full set of coring, tests and documentation in conformance with the Standard Specifications, except all test methods shall be modified as specified in these Special Provisions. Also, Contractor shall notify the Engineer at least 3 days in advance of coring operations, and immediately after core testing is complete Contractor shall deliver cores to the Agency for verification.
Nuclear test procedures, including correlation with core densities, shall be in conformance with California Test 375, except as follows:
If a test section is placed and compacted for that purpose, rolling shall be provided as follows: 1) 2 passes with a vibratory breakdown roller above 290 degrees F; and 2) 4 passes with a static roller above 200 degrees F. Core A
(D – E) – (D – G) / F
SPC25-11 F-21
locations for correlation with cores shall be selected based on appearance of relatively tight surface texture, and the test strip shall be selected on this basis. If a test location is determined to have a significantly open texture relative to other areas within the test strip, the location shall not be used. This selection criteria are not to be considered significant to the outcome of, but only as a guideline towards obtaining samples that are relatively well compacted to yield results with minimum standard deviation. The locations shall be well clear of grade breaks and joints. One core centered on the gauge will be used instead of two at each location. Use method 2) in this Subsection 302-9.4.1 to determine density of cores. Surface voids shall not be filled with sand.
Contractor will be notified in writing at least 5 days in advance of such correlation testing and will be invited to have a nuclear gauge onsite to correlate a second gauge. If not independently calibrating at that time, Contractor shall bear the full expense of performing correlation for his nuclear gauge under the specified procedures, but shall notify the City 5 days in advance of such correlation testing, such that the City can correlate with the Contractor’s gauge, if Contractor disagrees with City’s test results.
TABLE 302-9.4.1A
REDUCED COMPENSATION FACTORS
Relative
Compaction
(Percent)
Reduced
Compensation
Factor
Relative
Compaction
(Percent)
Reduced
Compensation
Factor
95.0 0.000 93.4 0.062
94.9 0.002 93.3 0.068
94.8 0.004 93.2 0.075
94.7 0.006 93.1 0.082
94.6 0.009 93.0 0.090
94.5 0.012 92.9 0.098
94.4 0.015 92.8 0.108
94.3 0.018 92.7 0.118
94.2 0.022 92.6 0.129
94.1 0.026 92.5 0.142
94.0 0.030 92.4 0.157
93.9 0.034 92.3 0.175
93.8 0.039 92.2 0.196
93.7 0.044 92.1 0.225
93.6 0.050 92.0 0.300
93.5 0.056
302-9.4.2 Compaction Payment Reductions.
Based on laboratory tests on AC pavements revealing a highly significant loss of life span for each 1 percent reduction of compaction, and the well known catastrophic effect of oxidation and stripping of asphalt products due to interconnected voids that develop below 95 percent compaction, and the extreme expense of removing and replacing pavement not compacted to the specified
SPC25-11 F-22
minimum, a nominal deduction of payment will be applied for under-compacted ARHM pavement. The bidder in submitting a bid fully accepts the provisions in this Subsection 302-9.4.2 and agrees that the nominal payment deduction is acceptable and reasonable for these purposes.
Payment reductions will be applied to ARHM compacted less than 95 percent of maximum density, the specified minimum, and greater than 91.9 percent of the maximum density based on nuclear testing with Part 3 Test Site Selection of California Test 375 modified as follows:
A lot will be one day’s production or other lesser area of paving as determined by the Agency to be deficient in terms of compaction, and a pull will be the width between joints or edge of pavement as the lot is placed.
Test site selection will conform to California Test 375 Part 3, except the number of tests shall be the area of the lot in square feet divided by 400 and any test site within .5m of a grade break or pavement joint shall be relocated laterally towards the center of the pull to .5m from such joint or grade break.
The mathematical mean average of percent of maximum density represented by all these tests shall be calculated, except any test results outside of this mean plus two standard deviations based on all tests, shall be rejected. The mean average shall be calculated directly from the remaining values. A compensation reduction in conformance with Table 302-9.4.1A will be applied to the contract unit price for ARHM for material within any lot determined to be below minimum relative compaction, except any lot with tests indicating compaction
91.9 percent or less shall be removed and replaced at Contractor’s expense. 302-9.7 Rock Dust Blotter.
Add the following:
Lack of uniformity of application of rock dust shall be cause to terminate paving operations. Rock dust blotter shall not be applied until intermediate rolling is complete, except as approved by the Engineer based on a fine uniform layer of rock dust, or at major intersections and access points.
302-9.9 Payment.
Replace the first sentence of the first paragraph with the following:
Payment for Construct ARHM Overlay Thickness per plan (GG-C PG 64-16) shall be paid at the contract price per ton (TN) and shall include, but not limited to, full compensation for furnishing all labor, materials, tools, equipment, transportation, crack sealing, tack coat, rock dust blotter, and other incidentals for doing all work, complete, and in place, involved in constructing ARHM overlay as indicated in the contract documents and no additional compensation will be allowed therefor.
SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY
INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS