Cities Index.
Agenda packet, regular meeting, first session

los_altos_hills City Council
November 12, 2026

Document
Agenda packet, regular meeting, first session
Meeting
November 12, 2026
Body
los_altos_hills City Council
Pages
647
Original file
111.1 MB
Text extracted from the city's file for reading and search. Open the original on losaltoshillsca.api.civicclerk.com. That file is the official record.

ITEM 5L
The amendment extends the agreement for a five-year term and establishes a new annual subscription cost of $70,900 (see Attachment 2). While the Town's annual software commitment increases from the current amount, the migration eliminates the need to maintain dedicated application servers and reduces ongoing dependence on third-party hardware support and replacement cycles. CentralSquare will assume responsibility for cloud infrastructure hosting, system monitoring, software updates, backups, and disaster recovery services.

DISCUSSION:

The proposed cloud modernization initiative provides several operational, financial, and strategic benefits beyond a simple software migration.

1. Elimination of On-Premises Hardware Dependencies
The Town's current Community Development platform operates on-premises and relies upon locally managed infrastructure and ongoing hardware support. Under the proposed amendment, CentralSquare will migrate the entire platform, database, GIS integrations, reports, and associated services into a managed AWS cloud environment. This transition allows the Town to reduce reliance on physical servers and third-party hardware support vendors while transferring responsibilities for infrastructure monitoring, operating system maintenance, backups, and disaster recovery to CentralSquare (see Attachment 2 and 3).

Additionally, the cloud platform includes a 99.9% uptime service level commitment, continuous monitoring, automated deployment processes, and dedicated cybersecurity protections, providing greater resiliency than the Town's current system (see Attachment 2).

2. Modern Citizen-Facing User Interfaces
A significant component of the modernization effort is the ability to transition from the existing eTRAKiT interface toward CentralSquare's next-generation Community Development Portal. The new portal provides an improved user experience for residents, contractors, and applicants through:
• Modern and intuitive user interface design.
• Unified access for permits, projects, licenses, and related services through a single dashboard.
• Guided permit applications that automatically identify required forms, fees, and application requirements.
• Real-time status updates and notifications.

Page 174 of 647 ends

ITEM 5L
• Integrated online payment functionality.
• Improved review comments and document management tools. • Contractor search and self-service features.

These improvements are expected to reduce customer confusion, streamline online permitting processes, and improve overall customer service experiences (see Attachment 2 and Attachment 3).

3. Enhanced Reporting, Analytics, and Artificial Intelligence Tools Migration to the cloud platform also positions the Town to take advantage of CentralSquare's newest reporting, analytics, and artificial intelligence capabilities. The modernization proposal includes access to cloud-exclusive functionality such as Centerline AI, which provides automated assistance, workflow enhancements, permit review support, and advanced analytics tools for Community Development operations (see Attachment 3).

The project also includes review and modernization of Cognos and SQL Server Reporting Services (SSRS) reports, helping staff improve data access and reporting capabilities across Community Development operations (see Attachment 3). This will help improve data reporting requests and allow Staff to customize and produce cleaner, more accurate reporting metrics.

4. Regional Collaboration Opportunities
A cloud-hosted platform provides a foundation for broader collaboration among partner agencies.

Staff anticipates that the new environment will better support future participation by the Los Altos Hills County Fire District, local water district partners, and the Santa Clara County Fire Department by allowing additional users, workflows, and integrations to be incorporated into a unified platform environment. This will allow these external agencies to upload, download and access our systems to provide information and allow more cohesive cooperation with each member agency.

Consolidating permitting, project review, inspections, and agency participation within a common platform will improve interagency coordination, reduce duplicative processes, and provide a more seamless customer experience for applicants working across multiple departments and partner organizations. Furthermore, this will migrate the Town away from the outdated, clunky and frequently unresponsive eTRAKiT resident/contractor portal.

Page 175 of 647 ends

ITEM 5L

5. Favorable Financial Terms
Staff successfully negotiated several promotional incentives through CentralSquare that substantially improve the overall value of the proposed amendment. If approved prior to the vendor's promotional deadline, the Town will receive:
• One-year deferral of cloud subscription payments.
• One-year deferral of Centerline AI subscription costs. • Waiver of all migration and implementation service fees, valued at approximately $18,640. • No annual subscription increases during the initial five-year contract term (see Attachment 2)
As a result, the Town will continue paying its existing maintenance structure until the migration is completed and renewal occurs, with no immediate increase in annual software expenditures during the remainder of the 2026 and vast majority of the 2027 calendar year. The Town will not start paying for the additional cloud support services until December 22, 2027. However, in order to receive these incentives, we must execute the contract by December 1, 2026 (see Attachment 3).

6. Synergies of a Single Vendor Solution
The Town currently relies on CentralSquare for its Community Development software platform.

Migrating to CentralSquare's cloud-hosted ecosystem allows the Town to maintain software, hosting, maintenance, security, support, upgrades, reporting, and future AI functionality under a single vendor relationship.

Maintaining a consolidated platform reduces integration complexity, simplifies vendor management, improves accountability for system performance, and ensures future product enhancements are delivered through a unified technology ecosystem rather than requiring multiple third-party services and support contracts.

FISCAL IMPACT:

The proposed amendment increases the Town's annual Community Development software subscription from approximately $44,760.45 to $70,900 annually, representing a net annual increase of $26,139.55 (see Attachment 2).

The increased annual expenditure includes:
• Community Development Advanced Site SaaS Cloud Subscription.

Page 176 of 647 ends

ITEM 5L
• AWS-hosted cloud infrastructure.
• Software maintenance and support.
• Security monitoring and compliance services.
• Disaster recovery and backup services.
• Ongoing software upgrades and cloud-exclusive enhancements. • Future access to CentralSquare AI and modernization features.

The agreement includes waived implementation costs totaling approximately $18,640 and deferred subscription payments until the subsequent contract renewal period, significantly reducing near-term budget impacts until at least December of 2027.

ENVIRONMENTAL REVIEW:

This item is not a project under the California Environmental Quality Act pursuant to CEQA Guidelines Section 15378 because it involves organizational and administrative activities that will not result in a direct or reasonably foreseeable indirect physical change in the environment.

ATTACHMENTS:

1. Resolution Authorizing the City Manager to Execute a Contract Amendment with CentralSquare Technologies, LLC for the purchase of for the addition of Community Development Cloud Modernization and Software-as-a-Service (SaaS) Migration Services

2. Amendment to the Contract Agreement between the Town of Los Altos Hills and CentralSquare Technologies, LLC

3. Presentation and Community Development Cloud Features Overview (October 29, 2026)

Page 177 of 647 ends

ITEM 5LAttachment 1
RESOLUTION xx-26

A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS

AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE

EXISTING AGREEMENT WITH CENTRALSQUARE TECHNOLOGIES, LLC FOR

COMMUNITY DEVELOPMENT CLOUD MODERNIZATION, SOFTWARE-AS-A-SERVICE (SAAS) MIGRATION, AND RELATED SERVICES FOR A TOTAL ANNUAL

COMMITMENT NOT TO EXCEED SEVENTY THOUSAND NINE HUNDRED
DOLLARS ($70,900)
WHEREAS the Town of Los Altos Hills currently utilizes the Community Development software platform provided by CentralSquare Technologies, LLC for permitting, planning, code enforcement, and related Community Development operations; and WHEREAS the Town and CentralSquare Technologies, LLC maintain an existing agreement for Community Development software and support services; and WHEREAS, CentralSquare Technologies, LLC has proposed migrating the Town's Community Development platform from an on-premises environment to a secure cloud-hosted Software-as-a-Service (SaaS) environment hosted through Amazon Web Services (AWS), including software upgrades, cloud hosting, maintenance, support, disaster recovery, security monitoring, and related modernization services; and
WHEREAS the proposed modernization will eliminate the Town's reliance on locally hosted infrastructure and associated hardware support requirements from Eaton while providing enhanced cybersecurity protections, system resiliency, automated updates, cloud-based disaster recovery capabilities, and ongoing software maintenance; and
WHEREAS the migration will position the Town to implement a modern citizen and contractor portal, enhanced reporting capabilities, cloud-exclusive software enhancements, and artificial intelligence tools that improve customer service and operational efficiency; and WHEREAS the cloud-hosted platform will support future collaboration and integration opportunities among the Town, the Los Altos Hills County Fire District, the Los Altos Hills Fire Department, regional water district partners, and other agencies utilizing Community Development workflows and services; and
WHEREAS through the Town's longstanding relationship with CentralSquare Technologies, LLC, staff negotiated favorable commercial terms including the waiver of implementation service fees,

Page 178 of 647 ends

ITEM 5LAttachment 1
deferred subscription payments, deferred AI licensing costs, and fixed subscription pricing for the initial five-year term; and
WHEREAS the proposed amendment will establish a total annual software subscription commitment of $70,900, representing an annual increase of $26,139.55 over the Town's current agreement; and
WHEREAS approval of this contract does not constitute a project under California Code of Regulations Section 15378(b) of the California Environmental Quality Act (CEQA) Guidelines.

NOW THEREFORE The City Council of the Town of Los Altos Hills hereby authorizes the City Manager to execute an amendment to the existing agreement with CentralSquare Technologies, LLC for Community Development cloud modernization, Software-as-a-Service migration, hosting, support, maintenance, and related services, substantially in the form presented to the City Council, for a total annual commitment amount not to exceed $70,900, representing an increase of $26,139.55 over the Town's current annual agreement.

BE IT FURTHER RESOLVED that the City Manager is authorized to take any additional actions necessary to implement the agreement.

The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a regular meeting held on the 12
th day of November 2026 by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

BY:
_______________________________
Rajiv Bhateja, Mayor
ATTEST:
______________________________
Arika Miller, City Clerk

Page 179 of 647 ends

CST-2026-106193

Page 1 of 15 ends

AMENDMENT TO THE SUNGARD ORDER #160386
This Amendment (this “Amendment”) to the SUNGARD ORDER #160386 (collectively, “Agreement”) entered into by and between SunGard Public Sector Inc. (“SunGard”), a CentralSquare Technologies, LLC company (“CentralSquare”), and Town of Los Altos Hills (“Client” or “Customer”) with an execution date of December 22nd, 2016, as amended from time to time including additional purchases is entered into and effective as of the last date of signature below (“Effective Date”). In the event of a conflict or inconsistency between this Amendment and the Agreement, the terms of this Amendment shall control.

Customer and CentralSquare may be referenced as each a “Party”, and together “Parties”.

WHEREAS, Customer entered into the Agreement for an on-premise deployment of the Community Dev solution; and
WHEREAS, through asset purchase, CentralSquare is the owner of all SunGard software products, services, and contractual obligations; and
WHEREAS, the Parties mutually agree and desire to switch the on-premise deployment of the Community Dev solution to a cloud-hosted deployment.

NOW THEREFORE, in consideration of the foregoing and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:

1. Term. Upon the Effective Date, the Agreement is renewed and extended for a term of five (5) years (the “Term”). This extension replaces and supersedes any prior term, renewal, or expiration provisions in the Agreement or any related document. The products, software, subscriptions, licenses, modules, services, and quantities ordered under this Amendment, as set forth in Attachment A (collectively, the “Committed Items”), are licensed and provided for the full Term as a single fixed bundle, and the fees reflect that full-Term commitment.

Accordingly, neither the Term nor any Committed Item is subject to unilateral reduction or early termination during the Term, except for an uncured breach as provided in the Agreement. Upon expiration of the Term, the Agreement will automatically renew for successive one (1) year terms unless either Party provides written notice of non-renewal at least ninety (90) days before the expiration of the then-current term.

2. Amendments to the Agreement. As of the Effective Date, the Agreement is hereby amended or modified as follows:
a. The items listed in Attachment A, attached to this Amendment, detail the items to be migrated to cloud, the services necessary, and associated costs. The on-premise software being migrated to cloud shall be replaced as applicable and licensed as follows:
i. Access Grant. So long as subscription fees are paid and current, (unless terminated as provided in the Agreement, Customer is granted a nontransferable, nonexclusive right to use the software for the Customer’s own internal use for the applications described in the Statement of Work, in the applicable environment (e.g., production, test, training, or disaster recovery system) and in the quantity set forth. Additional software subscriptions purchased after the execution of this Amendment shall also be accessed in accordance with the provisions of this section. Customer shall not use, copy, rent, lease, sell, sublicense, modify, create derivative works from/of, or transfer any software, or permit others to do said acts, except as provided in the Agreement. Any such unauthorized use shall be void and may result in immediate and automatic termination of the applicable access. The subscription access granted in this Agreement or in connection with it are for object code only and do not include a license or any rights to source code whatsoever.

ITEM5L Attachment 2

Page 180 of 647 ends

CST-2026-106193

Page 2 of 15 ends

ii. Attachment B, Statement of Services is hereby added as an additional document, in its entirety governing the cloud migration project. iii. Attachment C, Maintenance & Support is hereby added as an additional document that governs the support and maintenance of all software. iv. Attachment D, Service Level Commitments is hereby is added as an additional document that governs the cloud provisions of the software as applicable.

3. Limited Effect. Except as expressly provided in this Amendment, all of the terms and provisions of the Agreement are and will remain in full force and effect and are hereby ratified and confirmed by the Parties. Without limiting the generality of the foregoing, the amendments contained herein will not be construed as an amendment to or waiver of any other provision of the Agreement or as a waiver of or consent to any further or future action on the part of either Party that would require the waiver or consent of the other Party. On and after the Effective Date, each reference in the Agreement to "the Agreement” will mean and be a reference to the Agreement as amended by this Amendment.

4. Representations and Warranties. Each Party hereby represents and warrants to the other Party that:
a. It has the full right, power, and authority to enter into this Amendment and to perform its obligations hereunder and under the Agreement as amended by this Amendment. b. The execution of this Amendment by the individual whose signature is set forth at the end of this Amendment on behalf of such Party, and the delivery of this Amendment by such Party, have been duly authorized by all necessary action on the part of such Party. c. This Amendment has been executed and delivered by such Party and constitutes the legal, valid, and binding obligation of such Party, enforceable against such Party in accordance with its terms.

5. Miscellaneous. All other terms and conditions of the Agreement not specifically modified by this Amendment shall remain in full force and effect. Should any term in this Amendment conflict with a term in the Agreement, the terms of this Amendment shall control.

Page 181 of 647 ends

CST-2026-106193

Page 3 of 15 ends

IN WITNESS THEREOF, THE PARTIES HERETO HAVE ENTERED INTO THIS AMENDMENT AS OF THE EFFECTIVE DATE.

CentralSquare Technologies, LLC Town of Los Altos Hills 1000 Business Center Drive
Lake Mary, FL 32746
26379 Fremont Road,
Los Altos Hills, California , 94022
By: \s2\ By: \s1\
Print Name: \n2\ Print Name: \n1\
Print Title: \t2\ Print Title: \t1\
Date Signed: \d2\ Date Signed: \d1\

Page 182 of 647 ends

CST-2026-106193

Page 4 of 15 ends

Attachment A
Software & Services

SOFTWARE INCLUDED
_____

PRODUCT NAME QUANTITY UNIT PRICE TOTAL

1. Community Development: Advanced
Site SaaS Annual Subscription Fee 1 70,000.00 70,000.00

2. eTRAKiT Credit Card API Annual
Access Fee 1 900.00 900.00
Software Total 70,900.00 USD

SERVICES INCLUDED

DESCRIPTION TOTAL

1. Community Development Premise to Cloud Services - Fixed Fee 10,000.00

2. Public Administration Consulting Services - As Incurred 7,200.00

3. Public Administration Project Management Services - As Incurred 1,440.00 Services Subtotal 18,640.00 USD
Discount - 18,640.00 USD
Services Total 0.00 USD

QUOTE SUMMARY
_____
Software Subtotal
70,900.00 USD
Quote #: Q-106529

Page 183 of 647 ends

CST-2026-106193

Page 5 of 15 ends

Services Subtotal
18,640.00 USD
Quote Subtotal 89,540.00 USD
Discount - 18,640.00 USD
Quote Total 70,900.00 USD
Net Recurring Fees will increase in the amount of $31,946.00. For products being replaced in this project, this is an estimate based on the client’s current recurring fees of $38,954.00. The increase amount may change based on any adjustments to scope or pricing and depending on the final project timeline. Your new renewal estimate is $70,900.00. Any items not being replaced by this order will continue in addition to the renewal estimate listed.

TOTAL RECURRING FEES
_____

TYPE AMOUNT
TOTAL RECURRING FEES $70,900.00
CURRENT RECURRING FEES -$38,954.00
NET RECURRING FEE INCREASE $31,946.00

Page 184 of 647 ends

CST-2026-106193

Page 6 of 15 ends

Payment Terms:

Subscriptions:
- Annual Subscription Fees are due twelve (12) months after Delivery*, and annually thereafter on the anniversary of that date.
o The purchase(s) made under this Agreement is not subject to proration until after Year 5 of the term.
- Annual Subscription Fees shall be due as follows:

Year Term Amount Uplift
Year 1 cloud - continue to pay
On-premise maintenance
12 months, starting at
Delivery
- 0%
Year 2 Due on the anniversary
of the Delivery Date
12 months $70,900.00 0%
Year 3 Due on the second
anniversary of the Delivery Date
12 months $70,900.00 0%
Year 4 Due on the third
anniversary of the Delivery Date
12 months $70,900.00 0%
Year 5 Due on the fourth
anniversary of the Delivery Date
12 months $70,900.00 0%
- The Annual Subscription Fees following the initial five (5) year term, or starting with Year 6, shall increase by 5% or CentralSquare’s then current rate.

Services:

Payment Schedule:

Implementation Services
30% Due on Effective Date
20% Due at Project Kickoff
15% Due at completion of 1
st End User Training Session
30% Due at Go Live
5% Due at completion of Reliability Period
- If applicable, non-fixed fee professional services shall be due as incurred on a time and materials basis.

Non-fixed fee professional services are not included in the percentages outlined in the above Payment Schedule.
- If applicable, non-fixed fee travel expenses shall be due as incurred, invoiced monthly for the travel expenses of the preceding month. Non-fixed fee travel expenses are not included in the percentages outlined in the above Payment Schedule.
- If applicable, Fixed Fee travel expenses are included in the percentages outlined in the above Payment Schedule.

Hardware:
- If applicable, Non-subscription Hardware Fees are due on the Effective Date.

Licenses:
- If applicable, License Fees are due on the Delivery Date.

Support & Maintenance
- If applicable, Support & Maintenance Fees are due annually, starting prior to the first anniversary of the Delivery Date and annually thereafter.
- Annual Software Maintenance Fees shall increase by 5% each year. - If applicable, legacy support and maintenance shall be due until the payment date of the replacement subscription software detailed above. Any unused pre-paid support and maintenance shall be credited as a

Page 185 of 647 ends

CST-2026-106193

Page 7 of 15 ends

pro-rated amount towards the next applicable subscription software invoice due under this Agreement, or future invoice.

Third Party:
- If applicable, Third-Party Software Fees are due on the Effective Date. Third-Party software subscriptions and/or support fees shall be due annually thereafter on the anniversary of the Effective Date. Third-Party Software fees are subject to increase each year.
- If applicable, Third-Party Services shall be due 50% at Effective Date, 25% at completion of 1st End User Training Session, and 25% at Go Live.

Invoice Terms:

CentralSquare shall provide an invoice for the items in the schedule above no less than thirty (30) days prior to the due date.

ANCILLARY FEES
a. Customer is responsible for paying all taxes relating to this Agreement. Applicable tax amounts (if any) are not included in the fees set forth in this Agreement. If Customer is exempt from the payment of any such taxes, Customer must provide CentralSquare valid proof of exemption; otherwise, CentralSquare will invoice Customer and Customer will pay to CentralSquare all such tax amounts.
b. To the extent allowable by law, if Customer fails to make any payment when due, then CentralSquare may charge interest on the past due amount at the rate of 1.5% per month calculated daily and compounded monthly, or, if lower, the highest rate permitted under applicable law; and if such failure continues for 90 days following written notice thereof, CentralSquare may suspend performance or access until past due amounts have been paid. *Delivery: For cloud-based software Delivery shall be whichever the following applies and occurs first: Customer has (a) received log-in access to the software or any module of the software or (b) received access to the software via a URL.

Page 186 of 647 ends

CST-2026-106193

Page 8 of 15 ends

Attachment B
Summary of Services
Los Altos Hills, CA, Community Development Cloud Migration The parties mutually agree and acknowledge this Summary of Services is a high-level overview of the project requested, not detailed requirements or designs of solution.

Project Scheduling
Parties agree a schedule will be provided for services within thirty days from the execution of the applicable quote.

Change Requests
The parties may request a change to this summary of services, to increase hours or deliverables, through a written request to the CentralSquare project manager or resource.

Professional Services
Throughout the course of the project, CentralSquare will use several types of services (defined herein) to complete the necessary steps for successful deployment of the contracted services. The overall services aligned to implementation include Project Management, Consulting Services, Technical Services, Data Conversion Services, Training Services, and in some cases, Installation Services.

CentralSquare is not responsible for coordination, management, or covering the cost of any software, work, customization, coding or testing that is required to be performed by any third-party vendors engaged in the context of standard or custom interfaces, unless the work is defined under a Sub-Agreement with CentralSquare within the scope of this Agreement.

Business Hours
All project services will be performed during normal business hours, defined as 8:00- 5:00 PM Eastern Time. If Client desires to perform the services outside of these hours, additional fees will apply.

CentralSquare Connectivity to On-Premises Systems
The BeyondTrust/Bomgar and/or SecureLink remote support solutions shall be the method of remote access to on-premises customer systems and/or data.

Project Overview
CentralSquare will migrate the on-premise version of the Community Development software into the AWS cloud environment, migrate the customer's database, and upgrade to the latest version of Community Development available in AWS. A data conversion resource will reschedule client's Land Update (GTUR) & Financial Export Jobs. A GIS consultant will migrate the current environment and alter/rewrite the Python scripts as needed. A CentralSquare consultant will assist with migrating merge docs and the creation of up to 4 custom reports or forms, then assist the customer to go live on the new environment. Once the customer has officially switched over to the new environment, CentralSquare will create a test environment. Scope includes project management hours for client communications and project monitoring. All services listed herein are being provided remotely. No training, or configuration changes or any other services not specifically listed are included in this scope.

Services Scope

Page 187 of 647 ends

CST-2026-106193

Page 9 of 15 ends

The following outlines the proposed methodology for the project management, consulting, configuration, testing, and other services work necessary for the migration to AWS cloud. This work will include the creation of a new AWS hosted environment that the customer will transition into at go-live. Any customizations that currently exist in the customer’s system will not be included in this migration.

Significant Tasks Include:

Major Task Description
Kick Off Remote meetings with customer project manager and IT staff to review current environment and integrations. A mutually agreed-upon project schedule and timeline will be created. Scope includes project management hours for client communications and project monitoring.

New AWS Cloud Hosted
Environment
Creation of New Cloud Environment in AWS.

Installation A CentralSquare technical resource will install the Community Development software that is in the customer's production environment onto the cloud environment and migrate the customer's database. They will then upgrade the system to the latest available production version of Community Development available in AWS.

Data Conversion A CentralSquare Data Conversion resource will update the customer's Land Update Routine (GTUR) & Financial Export scripts.

GIS A CentralSquare GIS consultant will migrate the current environment and alter/rewrite the Python scripts as needed.

Consulting A CentralSquare consultant will assist with migrating merge docs and the creation of up to 4 custom reports or forms, then assist the customer to go live on the new environment.

Transition to New AWS Hosted
Environment
Once the customer has officially switched over to new environment, CentralSquare create a test environment.

Go Live
CentralSquare offers a variety of Go-Live services to augment the Customer’s staff during the transition from the legacy product to the CentralSquare solution. The Project Managers will work together to create a Go-Live Plan to include a schedule of events, resource allocation, communications plan, and issue log.

Requirements
The customer's production environment should be upgraded to latest supported version/hotfix of Community Development in their current environment before CentralSquare begins the migration to the AWS cloud environment. The customer will need to put in a help desk ticket to have their test environment upgraded to the latest version of 19x. After thoroughly testing this upgrade, the production environment can be upgraded, and then moved to cloud.

Page 188 of 647 ends

CST-2026-106193

Page 10 of 15 ends

Attachment C
Maintenance & Support
This Maintenance & Support Attachment describes support and maintenance relating to technical support that CentralSquare will provide to Customer during the Term of the Agreement.

1. Product Updates and Releases

1.1. Software Version. “Software Version” means the base or core version of the Software that contains significant new features and significant fixes and is available to the Customer. Software Versions may occur as the Software architecture changes or as new technologies are developed. The nomenclature used for updates and upgrades consists of major, minor, build, and fix and these correspond to the following digit locations of a release, a,b,c,d. An example of which would be 7.4.1.3, where the 7 refers to the major release, the 4 refers to the minor release, the 1 refers to the build, and the 3 refers to a fix. All Software Versions are provided and included as part of this Agreement.

1.2. Updates. From time to time CentralSquare may develop permanent fixes or solutions to known problems or bugs in the Software and incorporate them in a formal “Update” to the Software. If Customer is receiving technical support from CentralSquare on the general release date for an Update, CentralSquare will provide the Customer with the Update and related Documentation at no extra charge. Updates for custom configurations will be agreed upon by the Parties and outlined in a Statement of Work or Change Order.

1.3. Releases. Customer shall agree to install and/or use any New or Major Release within one year of being made available by CentralSquare to avoid or mitigate a performance problem, ineligibility for Support and Maintenance Services or infringement claim. All modifications, revisions and updates to the Software shall be furnished by means of new Releases of the Software and shall be accompanied by updates to the Documentation whenever CentralSquare determines, in its sole discretion, that such updates are necessary.

2. Support

2.1. CentralSquare shall provide to Customer support via toll-free phone number 833-278-7877 or via the CentralSquare Support Portal. CentralSquare shall provide to Customer, commercially reasonable efforts in solving errors reported by the Customer as well as making available an online support portal. Customer shall provide to CentralSquare reasonably detailed documentation and explanation, together with underlying data, to substantiate errors and to assist CentralSquare in its efforts to diagnose, reproduce and correct the error. Should either Party not be able to locate the error root cause and Customer and CentralSquare agree that on-site services are necessary to diagnose or resolve the problem CentralSquare shall provide a travel estimate and estimated hours in order to diagnose the reported error.

2.2. If after traveling onsite to diagnose a reported error and such reported error did not, in fact, exist or was not attributable to a Defect in the Software provided by CentralSquare or an act or omission of CentralSquare, then Customer shall pay for CentralSquare's investigation, travel, and related services in accordance with provided estimate. Customer must provide CentralSquare with such facilities, equipment and support as are reasonably necessary for CentralSquare to perform its obligations under this Attachment, including remote access in accordance with the Remote Access Policy.

3. Online Support Portal
Online support is available via https://support.centralsquare.com/s/contact-us, offering Customer the ability to resolve its own problems with access to CentralSquare’s most current information. Customer will need to enter its designated username and password to gain access to the technical support areas on CentralSquare’s website.

CentralSquare’s technical support areas allow Customer to: (i) search an up-to-date knowledge base of technical support information, technical tips, and featured functions; and (ii) access answers to frequently asked questions (FAQ).

4. Exclusions from Technical Support Services
CentralSquare shall have no support obligations to provide Support or Maintenance for Solutions that are not kept current to one version prior to the then current version of the Solution. CentralSquare shall have no support obligations with respect to any third-party hardware or software product not licensed or sold to Customer by CentralSquare (“Nonqualified Product”). Customer shall be solely responsible for the compatibility and functioning of Nonqualified Products with the Software.

5. Customer Responsibilities
In connection with CentralSquare’s provision of technical support as described herein, Customer acknowledges that Customer has the responsibility to do each of the following:

5.1 Provide hardware, operating system and browser software that meets technical specifications, as well as a fast, stable, high-speed connection and remote connectivity for accessing the Solution.

5.2 Maintain any applicable computer system and associated peripheral equipment in good working order in accordance with the manufacturers’ specifications, and ensure that any problems reported to CentralSquare are not due to hardware malfunction;

5.3 For CentralSquare Solutions that are implemented on Customer Systems, maintain the designated operating system at the latest code revision level reasonably deemed necessary by CentralSquare for proper operation of the Software;

Page 189 of 647 ends

CST-2026-106193

Page 11 of 15 ends

5.4 Supply CentralSquare with access to and use of all information and facilities reasonably determined to be necessary by CentralSquare to render the technical support described herein;

5.5 Perform any test or procedures reasonably recommended by CentralSquare for the purpose of identifying and/or resolving any problems;

5.6 At all times follow routine operator procedures as specified in the Documentation or any error correction guidelines of CentralSquare posted on the CentralSquare website;

5.7 Customer shall remain solely responsible at all times for the safeguarding of Customer’s proprietary, confidential, and classified information contained within Customer Systems; and

5.8 Reasonably ensure that the Customer Systems are isolated and free from viruses and malicious code that could cause harm before requesting or receiving remote support assistance.

6. Priorities and Support Response Matrix
The following priority matrix relates to software errors covered by this Agreement. Causes secondary to non-covered causes - such as hardware, network, and third-party products - are not included in this priority matrix and are outside the scope of this Attachment. CentralSquare will make commercially reasonable efforts to respond to Software incidents for live remote based production systems using the following guidelines:

Priority Issue Definition Response Time
Priority 1 –
Urgent
The software is completely down and will not
launch or function.

Priority 1 issues must be called in via 833-278-7877 and will be immediately answered and managed by the first
available representative.

Priority 2 –
Critical
A high-impact problem that disrupts the
customer’s operation but there is capacity to
remain productive and maintain necessary
operations.

Priority 2 issues must be called in via 833-278-7877 and will be immediately answered and managed by the first
available representative.

Priority 3 –
Non-Critical
A Software Error related to a user function which
does not negatively impact the User from the use
of the system. This includes system administrator
functions or restriction of user workflow but does
not significantly impact their job function.

Non-Critical Priority 3 issues must be reported via
Https://support.centralsquare.com/s/contact-us
Priority 4 –
Minor
Cosmetic or documentation errors, including
Customer technical questions or usability
questions.

Minor Priority 4 issues must be reported via
Https://support.centralsquare.com/s/contact-us

7. Exceptions. CentralSquare shall not be responsible for failure to carry out its Support and Maintenance obligations under this Attachment if the failure is caused by adverse impact due to:

7.1. defectiveness of the Customer’s Systems (including but not limited to environment, hardware or ancillary systems), or due to Customer corrupt, incomplete, or inaccurate data reported to the Solution, or documented Defect.

7.2. denial of reasonable access to Customer’s System or premises preventing CentralSquare from addressing the issue.

7.3. material changes made to the usage of the Solution by Customer where CentralSquare has not agreed to such changes in advance and in writing or the modification or alteration, in any way, by Customer or its subcontractors, of communications links necessary to the proper performance of the Solution.

7.4. a Force Majeure event (as outlined in Section 12), or the negligence, intentional acts, or omissions of Customer or its agents.

8. Incident Resolution. Actual response times and resolutions may vary due to issue complexity and priority. For critical impact level and above, CentralSquare provides a continuous resolution effort until the issue is resolved.

CentralSquare will make commercially reasonable efforts to resolve Software incidents for live remote based production systems using the following guidelines:

Page 190 of 647 ends

CST-2026-106193

Page 12 of 15 ends

Priority Resolution
Process
Resolution Time
Priority 1 – Urgent CentralSquare will provide a
procedural or configuration
workaround or a code correction
that allows the Customer to
resume live operations on the
production System.

CentralSquare will work continuously to provide the
Customer with a solution that allows the Customer to
resume live operations on the production system.

CentralSquare will either resolve the issue or provide a resolution plan as soon as possible and not later than
twenty-four (24) hours after notification.

Priority 2 –
Critical
CentralSquare will provide a
procedural or configuration
workaround or a code correction
that allows the Customer to
resume normal operations on the
production System.

CentralSquare will work continuously to provide the
Customer with a solution that allows the Customer to
resume normal operations on the production System.

CentralSquare will either resolve the issue or provide a resolution plan as soon as possible and not later than thirty-six (36) hours after notification.

Priority 3 – Non –
Critical
CentralSquare will provide a
procedural or configuration
workaround that allows the
Customer to resolve the problem.

CentralSquare will work to provide the Customer with a
resolution which may include a workaround or code
correction within a timeframe that takes into consideration the impact of the issue on the Customer and
CentralSquare’s User base. Priority 3 issues have no
defined resolution time.

Priority 4 – Minor If CentralSquare determines
that a reported Minor Priority
error requires a code correction,
such issues will be addressed in
a subsequent release when
applicable.

CentralSquare will work to provide the Customer with a
resolution which may include a workaround or code
correction in a future release of the software. Priority 4 issues have no defined resolution time.

9. Cases needing development. Support cases that require code development (e.g. writing, modifying or reviewing source code to create new functionality, resolve issues, or improve existing features) will be transferred to the appropriate product development team. Cases transferred to product development will be reviewed to determine the nature of the request, the severity of the impact on the performance of the solution, and the availability of a resolution. CentralSquare reserves the right to close out Non-Critical (Priority 3) and Minor (Priority 4) support cases, without resolution, for development items that do not reasonably fall within the current product roadmap.

10. Non-Production Environments. CentralSquare will make commercially reasonable efforts to provide fixes to non-production environment(s). Non-production environments are not included under the response or resolution tables provided in this Attachment.

10.1. Maintenance. All non-production environment resolution processes will follow the structure and schedules outlined above for production environments.

10.2. Incidents and service requests. Non-production environment incidents are considered priority 3 or 4, dictated by circumstances and will be prioritized and scheduled subordinate to production environment service requests.

11. Training. Outside the scope of training services purchased, if any, Customer is responsible for the training and organization of its staff in the operation of the Software.

12. Development Work. Software support and maintenance does not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Software, except such work as may be specifically purchased and outlined in the Agreement. CentralSquare retains all intellectual property rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

13. Technology Life Expectancy. Customer understands, acknowledges and agrees that the technology upon which the Hardware, Solution and Third-Party Software is based changes rapidly. Customer further acknowledges that CentralSquare will continue to improve the functionality and features of the Solution to improve legal compliance, accuracy, functionality and usability. As a result, CentralSquare does not represent or warrant that the Hardware, Solution and/or Third-Party Software provided to Customer under this Agreement or that the Customer Systems recommended by CentralSquare will function for an indefinite period of time. Rather, CentralSquare and Customer may, from time to time, analyze the functionality of the Hardware, Solution, Third-Party Software and Customer Systems in response to changes to determine whether Customer must upgrade the same. Customer upgrades may include without limitation, the installation of a new Release, additional disk storage and memory, and workstation and/or server upgrades. Customer upgrades may also include the installation and/or removal of Third-Party Software.

Customer is solely responsible for all costs associated with future resources and upgrades.

Page 191 of 647 ends

CST-2026-106193

Page 13 of 15 ends

CentralSquare Access Management Policy
In order to provide secure, federally compliant connections to agency systems CentralSquare Technologies (“CentralSquare”) requires BeyondTrust or SecureLink as the only approved methodology of connection. BeyondTrust and Securelink provide the necessary remote access in order to service and maintain CentralSquare products while adhering to the Federal Bureau of Investigations Criminal Justice Information Services requirements. Both solutions utilize two-factor authentication Federal Information Processing Standard Publication (“FIPS”) 140-2 validated cryptographic modules and AES encryption in 256-bit strengths.

BeyondTrust and Securelink are addressed in turn via this Access Management Policy; Customers may choose which remote privileged access management solution will be utilized by CentralSquare.

BeyondTrust
The BeyondTrust remote support solution may be utilized via escorted session or a jump Customer. As for an escorted session, when an agency needs assistance from CentralSquare, the agency employee requesting assistance will receive verbal or email communication with a session key necessary to enable remote access. If a verbal key is provided, the user enters the session key after visiting https://securesupport.centralsquare.com.

Jump Customers are a Windows service that can be stopped/started to facilitate a support session. Connections made via jump Customer can be active or passive. An active jump Customer is always available. A passive connection is enabled for a specific purpose and then disabled when not used. Regardless of the option selected, CentralSquare’s support team will arrange a BeyondTrust session to establish the jump Customer.

The jump Customer resides on the agency side on the installed device, where an agency administrator can manage. Instructions on how to enable/disable jump Customers can be provided upon request. A sample workflow of a passive jump Customer is provided below:

Should an agency require support from CentralSquare, a call would be placed and/or a support ticket opened in the portal on the CentralSquare customer support website. Before accessing the agency’s system and/or environment, the CentralSquare representative would send a notice of connection from the CentralSquare support portal instance. This notice can be sent to the individual at the agency that the CentralSquare representative is working with or other designated contacts as necessary. Upon receipt of the notice of connection, the agency personnel would enable the BeyondTrust jump Customer. The CentralSquare representative would then be admitted to the agency’s system and/or environment to perform the necessary task. Upon completion of the task, the CentralSquare representative sends a notice of disconnection from the CentralSquare support portal instance. Upon receipt of the notice of disconnection, the agency personnel would then disable the BeyondTrust jump Customer.

Securelink
Similar to BeyondTrust’s escorted session, Securelink may be utilized via “quick connect”. To enable a quick connect session when an agency needs assistance from CentralSquare, the Agency employee requesting assistance will enter a key code in order to connect for screen sharing on a device.

Similar to the jump Customer methodology, SecureLink may also be utilized via “gatekeeper”. The sample workflow description for a jump Customer provided above is substantially similar to the workflow for gatekeeper.

Summation
BeyondTrust and Securelink allow customers the ability to monitor connectivity to the customer’s network and maintain CJIS compliance while enabling CentralSquare to perform the necessary support functions.

Page 192 of 647 ends

CST-2026-106193

Page 14 of 15 ends

Attachment D
Service Level Commitments
The following applies to any cloud-hosted CentralSquare software only. The following does not apply to any on-premise software, hardware, or third-party products.

1. Service Level Commitments
A. Availability. During any calendar month, the availability of the Solution shall be no less than 99.9%, excluding Scheduled Maintenance and Emergency Maintenance. CentralSquare shall provide Customer with prompt notification as soon as it becomes aware of any actual or potential unscheduled downtime of the Solution, as well as continual periodic updates during the unscheduled downtime regarding CentralSquare’s progress in remedying the unavailability and estimated time at which the Solution shall be available. CentralSquare will give advance notice of Scheduled Maintenance as described below and in Exhibit 2 (Maintenance & Support). For Emergency Maintenance, CentralSquare will give as much advance notice as the circumstances reasonably allow; if advance notice isn’t possible, CentralSquare will notify Customer as soon as practicable after the maintenance begins, including the reason and, if known, the expected time to resolution.

B. Scheduled Maintenance: Emergency Maintenance. Scheduled Maintenance means routine, planned maintenance, patching, or updates performed during a designated maintenance window (see Exhibit C) or with at least twenty-four (24) hours’ notice to Customer. Emergency Maintenance means maintenance performed outside a Scheduled Maintenance window that CentralSquare determines, in good faith, is needed to prevent or address an imminent security threat, where the urgency doesn’t allow for that notice. Emergency Maintenance does not include downtime caused by CentralSquare’s response to a security incident, breach, or unauthorized access that has already occurred; that downtime is treated as unavailability, subject to the exceptions in Section 2.

C. Measurement. Service availability is measured as the total time that the solutions are available during each calendar month for access by Customer (“Service Availability”). Service Availability measurement shall be applied to the production environment only, and the points of measurement for all monitoring shall be the servers and the internet connections at CentralSquare’s hosted environment. The Solution is unavailable only when Authorized Users can’t access the production environment. A single feature or function being down or degraded doesn’t count as unavailability unless it stops Customer from performing a core function.

D. Calculation. Service availability for a given month shall be calculated using the following calculation:

I. The total number of minutes which the service was not available in a given month shall be subtracted from the total number of minutes available in the given month. The resulting figure is divided by the total number of minutes available in the given month.

II. Service availability targets are subject to change due to the variance of the number of days in a month.

III. The total number of minutes which the service was not available in a given month shall exclude minutes associated with Scheduled Maintenance or Emergency Maintenance.

E. Remedy. If the service period target measurement is not met, then the customer shall be entitled to a credit calculated as follows:

Service Availability in the relevant
Service Period
Percentage Reduction in Monthly Fee for the
Subsequent Service Period
Less than 99.9% but greater than or equal to 99.0% 5%
Less than 99.0% but greater than or equal to 95.0% 10%
Less than 95% 20%
F. Credit must be requested by the customer within sixty (60) days of the failed target. Any credit awarded shall be applied to the next applicable invoice. Customer shall not be eligible for credits where customer is more than thirty (30) days past due on their account.

2. Exceptions. The Service Level Commitments and availability stated in this Attachment do not cover services interruptions or performance issues that are caused by factors outside of CentralSquare or it’s hosting partner’s control. Such factors may include, but are not limited to:

Page 193 of 647 ends

CST-2026-106193

Page 15 of 15 ends

A. Internet Access. Issues relating to Customer’s internet access. Any outages, slowdowns, or other problems related to the internet connection are explicitly disclaimed; B. Customer’s Internal Network Issues. Issues originating from Customer’s internal network such as network congestion, network equipment failure, or misconfigurations are explicitly disclaimed; C. Third-Party Acts. Issues caused by the acts or omissions of third-parties, including providers of internet services, or for issues arising from third-party software or hardware that is not provided by CentralSquare is explicitly disclaimed;
D. Gross Negligence or Willful Misconduct. Issues relating to the failure or delay in performance to the extent caused by the acts or omissions of Customer or its agents constituting gross negligence or willful misconduct are explicitly disclaimed; and,
E. Force Majeure. A force majeure event such as natural disasters, acts of God, or any other cause constituting force majeure are explicitly disclaimed.

3. Server Performance & Capacity. The standard provisioning of storage for the cloud solutions is 1 terabyte. If Customer requests to add additional Software, increase storage or processing requirements, and/or request additional environments, these requests will be evaluated and if additional resources are required to support modifications, additional fees may apply at per unit (gigabyte, hour, license, etc).

4. Releases. Customer agrees keep the software up-to-date with the cloud release cycle as determined by CentralSquare. Staying current is essential to address security, performance, and infringement issues, and is required for receiving software support. All modifications, revisions, and updates to the software will be provided through new releases, accompanied by documentation updates whenever the CentralSquare deems necessary.

5. Non-Production Environments. Included in the subscription fee is access to the training environment during the hours of 8:00am – 4:00pm EST, Monday through Friday. Should the Customer require extended access for items such as internal training, CentralSquare can make exceptions provided that Customer provide reasonable advance written notice. CentralSquare will then work with the Customer to enable access in accordance with an agreed upon schedule.

Page 194 of 647 ends

Los Altos Hills, CA
Community Development Cloud Modernization

Page 195 of 647 ends

U P G R A D E V A L U E B R I E F
Community Development
The Value of Upgrading to Cloud and the new, modern Citizen Portal

Page 196 of 647 ends

COMMUNITY DEVELOPMENT CLOUD MODERNIZATION & NEW CITIZEN PORTAL Migrate Community Development to the cloud and launch a modern citizen and contractor portal.

K E Y A C T I V I T I E S
1 Permitting, licensing, and code
enforcement process review
2 Community Development upgrade
and AWS cloud migration
3 New citizen and contractor portal
implementation (replaces e-trakit;
see Appendix)
4 Payments and citizen-request
integrations
5 Cognos and SSRS reporting review
6 Administrator and end-user training

O U T C O M E

COMMUNITY DEVELOPMENT

IN THE CLOUD, WITH A

MODERN CITIZEN PORTAL
Los Altos Hills, CA | Community Development Modernization Cloud hosted Citizen portal

Page 197 of 647 ends

WHY MOVE TO THE CLOUD
COST

T O D A Y
Large CapEx and
over-provisioning of
HW, or under-provisioning

I N T H E C L O U D
OpEx: no hardware costs
in Cloud. Predictable
expense

SCALABILITY

T O D A Y
Manual effort or pay
someone, time
consuming, potential
backlog and supply
chain issues

I N T H E C L O U D
Agile allocation of
resources, happens on-the-fly

TEAM EFFICIENCY

T O D A Y
Off-load CST work,
nights and weekends

I N T H E C L O U D
Focus on other critical
organization IT work

OPERATIONAL EXCELLENCE

T O D A Y
Potential for
downtime. Weekend
work

I N T H E C L O U D
Continuous monitoring
and alerting, page out to
resolve, DR strategy

SECURITY

T O D A Y
Security knowledge,
staffing, physical
controls, audits

I N T H E C L O U D
Training, compliance,
certifications, dedicated
security team
Los Altos Hills, CA | Community Development Modernization What changes for Corona’s Community Development team when CentralSquare hosts the system

Page 198 of 647 ends

T H E C L O U D A D V A N T A G E

CLOUD INFRASTRUCTURE, REFRESHED
We refreshed the entire cloud platform underneath Community Development – so cloud customers get faster releases, safer deployments, and every 26.1 improvement first.
6 W E E K R E L E A S E C A D E N C E
100%

A U T O M A T I C D E P L O Y M E N T S
3,500+

T E S T C A S E S P E R R E L E A S E

ALWAYS ON THE LATEST
The 26.1 platform improvements reach cloud first and keep coming. Cloud customers move to a six-week release cycle, so new features and fixes deploy automatically – with fewer moving parts at deployment and less that can go wrong. Cloud customers are simply always current.

Page 199 of 647 ends

Los Altos Hills | Community Development Modernization

COMMUNITY DEVELOPMENT CLOUD OVERVIEW
How CentralSquare will secure, support and maintain Corona’s Community Development system in the cloud

SECURITY
■ SOC1 and SOC2 Type II certified
Environment with annual 3rd-party
audits
■ PCI-DSS Compliant
Annual 3rd-party audits
■ Data encrypted
In transit and at rest
■ Internal and external vulnerability scans

SUPPORT & INCIDENT RESPONSE
■ 24/7/365 Cloud platform monitoring
– CPU utilization
– Memory utilization
– Storage utilization
– Services
– Websites
– Alert/Response to system issues
– Scalable Hardware
– OS upgrades and patches
■ Cloud and Networking resources
For onboarding & ongoing needs
■ Defined SLA framework
With customer notifications by
severity level

DR & MAINTENANCE
■ Local outage at the City
Corona staff keep working from any
location with internet access
■ Offloaded responsibility for:
– Daily, weekly, monthly backups
■ Standard maintenance window
Sunday, 12 am – 12 pm EDT

Page 200 of 647 ends

OUR PARTNERSHIP WITH AWS
How AWS functionality makes the Community Development experience better for Corona 1 S3 VERSIONING AND

ATTACHMENTS
Built on Amazon S3,
documents keep a full
version history and
attachments become more
capable and reliable.
2 IMMUTABLE, READ-ONLY

RECORDS
Immutable objects keep
emails, invoices, and
similar records read-only,
so the original can never
be altered.
3 CENTERLINE AI
Our partnership brings
Centerline AI into
Community Development,
putting AI tools directly in
your team’s hands.
4 FASTER FEATURE DELIVERY
As we integrate further
with AWS, new
capabilities like these
arrive faster, and more
often.

CLOUD EXCLUSIVE All of these capabilities are cloud exclusive. Our AWS partnerships let us roll out more features, faster.

Los Altos Hills | Community Development Modernization

Page 201 of 647 ends

NEW CITIZEN PORTAL
What the upgrade delivers for your organization and your citizens

ONE PORTAL, EVERY SERVICE
Permits, projects, licenses, utility billing, and
property tax all live in a single dashboard, so
citizens stop juggling logins and systems.

SMART, GUIDED APPLICATIONS
Address-based logic surfaces the right permit
types, required fields, and fees automatically, so
citizens apply correctly the first time.

REAL-TIME STATUS ALERTS
Banner notifications flag inspections ready to
schedule and reviews awaiting response,
keeping inspectors informed without a phone
call.

SECURE, EMBEDDED PAYMENTS
Central Square Payments is built directly into the
portal at the highest PCI compliance level, so
citizens can make payments without redirects or
different platforms.

AI-POWERED SELF-SERVICE
Built-in AI answers common questions, like why
a bill increased or which permit is needed,
reducing calls into city staff.

A MODERN, CLEARER EXPERIENCE
A clean redesign replaces the old, clunky feel,
with example attachments, contractor search,
and full, easy-to-read review comments.

Page 202 of 647 ends

Community Development Portal - Dashboard
City of CentralSquare Nicholas Summers
• Inspections You may now schedule inspections for 1 record(s). Schedule Inspections Dashboard
Dashboard
ED
Permits Inspections Projects Licenses
Apply For
11 39 8
Pay Fees
Permits
You have 11 Applications and 1 Permits in the sections below.

Inspections
Permit Applications (11) ^ Sort -
Contact Us
ELECTRICAL - RESIDENTIAL NEW SINGLE FAMILY RESIDENCE- WATER HEATER - •.. ELECTRICAL - RESIDENTIAL NEW SINGLE FAMILY RE 2026 PEARMAIN DR PALMDALE CA 93551 2019 PEARMAIN DRIVE PALMDALE CA 93551 39777 COUNTRY CLUB DR PALMDALE CA 93551 2026 PEARMAIN DR PALMDALE CA 93551 2540 MAPLE LEAF TER PALMDAL Last Updated on Last Updated on Last Updated on Last Updated on Last Updated on Continue Step 6 - Review → Continue Step 6 - Review → Continue Step 3 - Information → Continue Step 6 - Review → Continue Step 6 - Review → Permits (1) ^ 7 Filter
Quick Status Filters. APPLIED (1)
Permit • 11 Permit Type 11 Address 1J Parcel 11 Applied Date 1L Expire Date T Fees Due TL Status T1 Actions WEB-1423 CELL SITES 2025 PEARMAIN DRIVE PALMDALE CA 93551 3206048046 05/05/2026 APPLIED •*•

Page 203 of 647 ends

Community Development Portal - Permit Overview
City of CentralSquare 3 Nicholas Summers
Permit # WEB-1423 Request Inspection Attachments (0)
Dashboard
• 2025 PEARMAIN DRIVE PALMDALE CA 93551 E CELL SITES -
Apply For Overview Fees $0.00 Inspections (0) Conditions (0 Reviews (0) Additional Info Pay Fees Permit Info Fees Summary Status Updates Linked Records Type CELL SITES - Amount Paid $0.00
Inspections
Short Description CELL SITES Fees Due $0.00
No Data Available No Data Available
Status APPLIED
Contact Us Applied Date 05/05/2026
Expiration Date
Location Info Contacts
Address 2025 PEARMAIN DRIVE PALMDALE CA 93551 Applicant Parcel Number #3206048046 Name Nicholas Summers
Owner GRIGORIAN,STEVE Address 1234 Business Center Dr City of Centralsquare CA 12345 - 01
Phone 6198888888
Email [email protected]
Contractor
Name Sunshine Construction
Address 1234 Minerva Way City of CentralSquare CA 12354

Page 204 of 647 ends

Community Development Portal - Permit Application Process - City of CentralSquare © Nicholas Summers NS
Getting Started
Apply for Permit
Dashboard Permit
• 2026 PEARMAIN DRIVE PALMDALE CA 93551 E NEW SINGLE FAMILY RESIDENCE - Projects
License
Apply For
Contractor
STEP : STEP 2 STEP 3 STEP 2 STEP 5 STEP S
Location Permit Type Permit Info Attachments Contacts Review Permit Info
Please check all of your entries before proceeding to the next step Deschotion
Job Value
Plumbing
Fixture Count
Exit Delete Back Next

Page 205 of 647 ends

CENTERLINE AI IS NOW AVAILABLE IN PUBLIC ADMIN, BRINGING SIGNIFICANT VALUE TO COMMUNITY

DEVELOPMENT

Page 206 of 647 ends

Los Altos Hills | Community Development Modernization

OUR OFFER TO LOS ALTOSHILLS, CA
Sign by December 1, 2026 and receive four incentives.

O F F E R D E A D L I N E Execute the agreement by December 1, 2026 1 YEAR
Payment deferral Cloud
Your first payment moves
out one full year
$0
Implementation services
No services fees to move
Naviline to the cloud
0%
Annual increase, Years 1–5
Your subscription price
stays flat for five years
1 YEAR
Payment deferral
Centerline AI
AI help bots, workflows
and analytics included
15

Page 207 of 647 ends

ITEM 5M
TOWN OF LOS ALTOS HILLS November 12, 2026
Staff Report to the City Council
SUBJECT: ADOPT A RESOLUTION AMENDING THE TOWN’S TRAVEL AND

EXPENSE POLICY RECOMMENDED BY THE ENVIRONMENTAL

INITIATIVES COMMITTEE (EIC)
PREPARED BY: Behrouz Amirbadvy, Community Development Department Analyst FROM: Jay Bradford, Community Development Department Director APPROVED: Cody Einfalt, City Manager
RECOMMENDATION:

That the City Council adopt a resolution (see Attachment 1) amending the Town’s Travel and Expense Policy to encourage the use of electric/green transportation options when costs and convenience are comparable, as recommended unanimously by the Environmental Initiatives Committee (EIC) on August 27, 2026 (see Attachment 2).

BACKGROUND:

The Town’s Travel and Expense Policy adopted via Resolution 71-25 in October 2025 (see Attachment 3) provides comprehensive guidelines for business-related travel, including lodging, meals, airfare, ground transportation, mileage reimbursement, and rental vehicle use. The policy’s overarching purpose is to ensure that public funds are used reasonably, efficiently, and transparently when employees or officials travel on behalf of the Town.

Relevant to the proposed amendments, the current policy includes the following provisions:
• Section II, B5: “Only economy car models may be rented… Prepaid gas is not to be selected…”
• Section II, C1: Taxis/Shuttles: “Whenever possible, hotel courtesy buses or local shuttle services should be used. Taxi service or Ride Share should be used only when no other convenient, less costly transportation is available.”
DISCUSSION:

The current policy, while emphasizing cost efficiency and practicality, does not explicitly reference environmentally preferable transportation choices.

Page 208 of 647 ends

ITEM 5M
At its August 27, 2026, meeting, the Environmental Initiatives Committee discussed opportunities to align Town practices with its adopted sustainability goals. By unanimous vote, the Committee recommended inserting language into two portions of the travel and expense policy as shown above.

The Committee recommended adding the following sentence to each relevant section:
“The electric/green option must be preferred if all other factors are equal.” The EIC clarified that this preference should apply only when all other factors are equal. If an electric/green option is substantially more expensive or materially less convenient (for example, long wait times), employees may select a transportation that does not reduce or curb greenhouse gas emissions.

Staff recommends that the City Council approve the proposed amendments to the Travel and Expense Policy as recommended by the EIC. For redlined version of the policy changes see Attachment 4.

ENVIRONMENTAL REVIEW:

The proposed amendments are administrative in nature and do not constitute a project under the California Environmental Quality Act (CEQA), pursuant to CEQA Guidelines Sections 15378(b)(2) and 15378(b)(5). The amendments establish a preference for environmentally sustainable transportation when cost and convenience are comparable and will not result in direct or reasonably foreseeable indirect physical changes to the environment. Therefore, no further environmental review is required.

CITY COUNCIL WORKPLAN:

Although this item was not identified as one of the City Council’s priorities in the adopted 2026- 2027 City Council Workplan, it was identified as a potential operational efficiency to improve the Town’s greenhouse gas emissions.

FISCAL IMPACT:

The proposed amendments are not anticipated to have a significant fiscal impact. The preference for electric or environmentally sustainable transportation applies only when costs and convenience are comparable to conventional options. Any associated expenses will be accommodated within existing departmental travel budgets, and no additional appropriations are requested.

Page 209 of 647 ends

ITEM 5M
ATTACHMENTS:

1. Resolution Amending Section II of the Los Altos Hills Travel and Expense Policy

2. EIC Minutes, August 27, 2026

3. Resolution 71-25 w/ Travel Policy, October 16, 2025

4. Travel and Expense Policy Redline – EIC Recommended Language

Page 210 of 647 ends

ITEM 5M Attachment 1
RESOLUTION xx-26

A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS AMENDING THE TOWN’S TRAVEL AND EXPENSE POLICY TO ESTABLISH A

PREFERENCE FOR ELECTRIC/GREEN TRANSPORTATION OPTIONS
WHEREAS the City Council adopted the Town’s Travel and Expense Policy through Resolution No. 71-25 in October 2025 to provide accountable, transparent, and economical guidelines for travel and related expenses incurred on Town business; and WHEREAS, the Environmental Initiatives Committee, at its August 27, 2026 meeting, unanimously recommended amendments to the rental vehicle and taxi/rideshare provisions of the Travel and Expense Policy to encourage environmentally preferable transportation when prices and convenience are similar; and
WHEREAS the City Council desires to incorporate this preference without modifying other policy provisions governing authorization, reasonableness, cost effectiveness, or reimbursement; and
WHEREAS the City Council finds that these administrative policy amendments are not a project under the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines Sections 15378(b)(2) and 15378(b)(5), because they involve general policy and procedure making and governmental administrative activities that will not result in a reasonably foreseeable direct or indirect physical change in the environment; and WHEREAS independently, if the amendments were determined to constitute a project, the City Council finds that the common-sense exemption under State CEQA Guidelines Section 15061(b)(3) would apply because there is no possibility that the adoption of these limited administrative amendments, in itself, would have a significant effect on the environment.

NOW THEREFORE that the City Council of the Town of Los Altos Hills as follows:

1. The foregoing recitals are true and correct and are incorporated herein by reference; and

2. Section II.B.5 (Automobile Rental Cars) and Section II.C.1 (Taxis/Shuttles) of the Town’s Travel and Expense Policy adopted by Resolution No. 71-25 are hereby amended as set forth in Exhibit A, attached hereto and incorporated herein by reference.

3. All other provisions of the Town’s Travel and Expense Policy shall remain unchanged and in full force and effect. In the event of a conflict between the amendments in Exhibit A and the prior text of those two sections, Exhibit A shall control.

BE IT FURTHER RESOLVED that his resolution shall take effect immediately upon adoption and shall apply prospectively to travel arrangements made following its effective date.

Page 211 of 647 ends

ITEM 5M Attachment 1
PASSED AND ADOPTED by the City Council of the Town of Los Altos Hills at a regular meeting held on November 12, 2026, by the following vote:

AYES: ______________________________
NOES: ______________________________
ABSENT: ____________________________
ABSTAIN: ___________________________
__________________________________
_
Mayor, Town of Los Altos Hills
ATTEST:
____________________________________
City Clerk

Page 212 of 647 ends

ITEM 5M Attachment 1

EXHIBIT A

AMENDMENTS TO THE TOWN TRAVEL AND EXPENSE POLICY
The following language is inserted into the existing sections as indicated below. All other language in each section remains unchanged.

Section II.B.5 — Automobile (Rental Vehicles)
Insert the following sentence immediately after the sentence stating that only economy car models may be rented unless an upgrade is provided at no additional cost to the Town:
“The electric/green option must be preferred if prices and convenience are similar.” Section II.C.1 — Taxis/Shuttles
Add the following sentence after the existing requirement that taxi service or rideshare be used only when no convenient, less costly transportation is available:
“The electric/green option must be preferred if prices and convenience are similar.” These additions correspond to the redlined Town Travel and Expense Policy presented to the City Council on November 12, 2026.

Page 213 of 647 ends

ITEM 5M Attachment 2

1. Call to Order (roll call)

1. Time: 6:32 pm

2. Present: Anand R, Vrinda B, April A, Mike S, Johann G

3. Absent: Steve S, Aileen L, George L

4. Staff: Behrouz A

5. Public: Jasmeen P, Indu K

2. Agenda Review

1. No changes

3. Public Comment

1. Indu K and Jasmeen P introduced themselves. They're both running for council and talking about their campaigns.

4. Minutes Approval:

1. May Regular Meeting

1. Motion to Approve: Vrinda, Second: April, Carried unanimously

5. Election of Officers

1. Chair: Motion to re-elect Anand by Vrinda, Second: April, Carried unanimously

2. Vice-Chair: Motion to re-elect Mike by Anand, Second: Vrinda, Carried unanimously

3. Secretary: Motion to re-elect Steve by Anand, Second: April, Carried unanimously

6. Picnic Recap

1. April: Lower attendance than last year, location of the dream house created problems with parking etc

2. Vrinda: has a table banner created, will work on a poster board for next year.

3. Multiple locations for the dream house were discussed. April and Steve appointed to a subcommittee to discuss with Amina and Cody and find a suitable location for next year

Page 214 of 647 ends

ITEM 5M Attachment 2

4. Everybody liked the dream house and led to many questions from residents.

7. Town car-rental policy

1. Anand led the discussion, would like to update the town's travel policy to prefer electric cars when renting/ubering.

2. Vrinda has some concern about adding too many regulations.

3. Anand believes it's a one-line change to the policy

4. Motion to approve by Mike, second by April, carries unanimously

5. Anand to follow up with Behrouz

8. Subcommittee Updates:

1. Outreach

1. Aileen has a high school student who will help with outreach, Vrinda and Mike to meet with them soon to discuss scope

2. Vrinda likes the Los Altos mailer who would like to do something similar for LAH. We should first find out how effective the Los Altos mailer was.

3. Mike talked about his articles in Our Town. Would like members to come up with ideas for future issues of the magazine. Water? Balcony solar?

4. Johann to present on his updates to website at the next meeting

2. Foothill College

1. No new updates. They did have an article in the paper about electrification. This is a huge improvement from the past.

3. Tracking Electrification

1. Vrinda presented on meetings with Jay

2. Starting August 1, all hpwh and hp hvac will have a field added to indicate electrification!

3. New construction and ADU are all-electric but no separate permits so it's harder to track exactly how much equipment got installed

Page 215 of 647 ends

ITEM 5M Attachment 2

4. Substantial remodels not all-electric yet owing to delays in getting the reach codes approved by the state. Many jurisdictions in this situation.

5. Potential data in the CHEERS database. Anand to work with Vrinda on looking into it.

6. Perhaps we can also get some data from SVCE?

9. Council Update

1. Not too many updates. But the town will be bringing back a quote from security patrol vendors for electric vehicles instead of gas. We should show up and support EVs!

10.Agenda Requests for Next Meeting (9/24)

1. Outreach and Electrification tracking updates.

2. Remote meeting protocols

11.Adjournment

1. Time: 7:51pm

Page 216 of 647 ends

RESOLUTION 71- 25

A RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS

APPROVES THE TRAVEL POLICY
WHEREAS, the Travel Policy sets guidelines and rules to govern employees traveling for business purposes; and
WHEREAS, the Town' s preferred methods for booking flights, hotels, and other travel arrangements; and
WHEREAS, the Town will allow international or out- of-state travel for any event or activity with the appropriate approval levels; and
WHEREAS, the City Council can travel internationally or out-of-state as long as approved at a City Council meeting; and
WHEREAS, the Town' s required travel documentation is outlined in the policy (Attachment A); and NOW, THEREFORE, BE IT RESOLVED, by the City Council of the Town of Los Altos Hills approves the updated Travel Policy.

The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a special meeting held on the 16111 day of October 2025 by the following vote:

AYES: TANKHA, BHATEJA, MOK, SWAN, TYSON
NOES: NONE
ABSTAIN: NONE
ABSENT: NONE
BY:

ATTEST: Kavita Tankha, Mayor
ilea Birdsong -Miller,' Gity Clerk
RESOLUTION 71- 25
ITEM 5M Attachment 3

Page 217 of 647 ends

LOS ALTOS H11LS

TRAVEL AND EXPENSE POLICY
W r

CALIFORNIA

PURPOSE
Town travel should be for business and training purposes that is of value to the Town and its residents.

All expenses incurred while on Town business should constitute reasonable and practical use of public funds. When traveling, employees shall choose the most efficient, direct and economical travel options available.

The purpose of this policy is to establish business travel guidelines for Town employees that are fair, accountable, and transparent. This policy addresses the criteria for Town payment of travel expenses and/ or advances incurred by the Town employee.

I. GENERAL GUILDELINES
A. Authorized expenses shall include, but are not limited to, authorized business expenses incurred while engaging and/ or participating in the following activities and/ or events, which meet the criteria listed below:

1. The seminar, meeting, function, certification training or conference is mandatory or necessary to accomplish key Town or employee goals and objectives. Such activities include, but are not limited to:
a. Participating in and attending meetings of regional, state and national organizations whose activities affect the Town' s interests. b. Attending educational seminars designed to improve skill and information levels.
c. Attending business meetings, functions of local civic or community organizations where there is a clear nexus between the event and Town employee duty, i.e., not purely social events.

Town of Los Altos Hills October 2025
Travel Policy 1

Page 218 of 647 ends

2. Ifthe training location requires an overnight stay, efforts should be made to ensure no local option is available. Government rates should be used when available.

Attendance at conferences and travel time to and from the conference must receive prior approval from the employee' s supervisor. If the employee is eligible for overtime or compensatory time accrual during the travel time and conference event, wages will be calculated in accordance with FLSA requirements. Lodging at conference sponsored or group rate discount are to be utilized.

3. Registration fees will be fully paid by the Town, preferably by Town credit card. If a credit card payment is not feasible, the Town may issue a check directly to the vendor. Any discounts offered for early registration or attendance by additional people should be obtained whenever possible.

4. International travel for any event or activity requested by staff requires Department Head, City Manager and City Council approval while out-of-state travel for any event or activity shall be authorized first by the department head and then by the City Manager.

5. Any City Council members requesting out- of-state travel or international travel for any event or activity shall be approved at a City Council meeting.

B. The following are examples, but not all inclusive, of personal expenses for which the Town will not reimburse the employee, even when incurred. in conjunction with approved reimbursable expenses:

Expenses incurred as a result of supplemental personal travel.

Political or charitable contributions or events.

Family or companion expenses, including those related to child or pet care.

Entertainment expenses
Meals for any person other than the employee.

Non -mileage personal automobile expenses, including repairs, traffic citations, insurance, or gasoline.

Personal losses incurred while on Town business.

Inaccurate receipts that are greater than the reimbursable cost of the item.

Alcohol
C. Payments for travel and expenses will be made on a reimbursement basis, with employees submitting a Statement of Travel Expenses and receipts after travel. Prepayments ( e. g., conference registration, airfare, lodging) should be made directly to vendors whenever feasible. Cash advances to employees are strongly discouraged and may only be approved in exceptional circumstances by the City Manager or designee.

D. Reimbursement of expenses may be made only for Town employees; no reimbursement is allowed for non -employees accompanying the attendee.

Town of Los Altos Hills October 2025
Travel Policy 2

Page 219 of 647 ends

E. All reimbursement claims or advances for travel and expenses ( including registration) shall be accompanied by sufficient supporting documentation including original receipts, copies of registration forms, invoices, cancelled checks or notation for any receipts that are lost.

F. All claims for travel and expenses shall be signed by the employee' s supervisor and Department Head or his/ her designee.

II. TRANSPORTION
A. Airfare

1. Use of air, train, private automobile, or other mode of transportation shall be selected based on the least expensive option for the Town. Government and group rates should be used when available.

2. Transportation costs to and from the authorized destination will not exceed advance purchase economy class airfare unless such fare is not available. Employees shall inquire as to any government discount the airline may provide. The Town will not pay for upgrades ( e. g. seat upgrades or early boarding options) without prior approval from the City Manager or his/ her designee.

B. Automobile

1. No allowance or reimbursement for transportation is authorized when a Town vehicle is used.

2. When two ( 2) or more employees are traveling by vehicle, the employees should make every effort to travel together.

3. Automobile mileage will be reimbursed at the rate set by the Internal Revenue Service IRS) in effect at the time of travel and will be reimbursed for the distance between home and the destination or work and the destination, whichever is less. Finance shall be responsible for determining the applicable rate at the time of travel. This amount does not include bridge and road tolls, which are reimbursable at actual rates. Any employee in a management position who receives a vehicle allowance is not eligible for mileage reimbursement. Mileage reimbursement should be submitted within thirty (30) days of travel.

4. If a personal vehicle is used to and from the airport, the actual mileage will be reimbursed. Parking at the airport will be reimbursed or a shuttle to and from the airport.

It is encouraged that the cheaper of the two options be used.

5. The necessity for a rental car must be established and authorized in advance by the City Manager or his/ her designee. Only economy car models may be rented unless the Town of Los Altos Hills October 2025
Travel Policy 3

Page 220 of 647 ends

upgrade is provided at no additional cost to the Town. Prepaid gas is not to be selected, but optional insurance is required and will be reimbursed. The employee is required to notify the Town' s Risk Manager and their supervisor, immediately, in the event of any incident or accident related to the rental vehicle. If and when available a police report should also be obtained if involved in a vehicle accident. When 2 or more employees are attending the same training, the rental vehicle, if approved, should be shared.

C. ' Taxis/ Shuttles

1. Whenever possible, hotel courtesy buses or local shuttle services should be used.

Taxi service or Ride Share should. be used only when no other convenient, less costly transportation is available.

III. LODGING
A. No lodging expenses incurred by employees within a 50 -mile radius will be reimbursed unless there are extenuating circumstances and approved prior by City Manager or his/ her designee approval.

B. Lodging expenses may be prepaid directly to the hotel or reimbursed. Prepayment or reimbursement will be limited to single occupant room rates. Lodging reimbursement shall not exceed conference hotel cost or host group rate with the exception the lodging is not available. No reimbursement will be made when lodging is at a family/friend' s residence.

IV. MEAL COSTS
A. The Town will provide meal and incidental expense reimbursement on a per diem basis, consistent with the U. S. General Services Administration ( GSA) rates in effect at the time and location of travel. Receipts are not required for meals and incidentals reimbursed under the per diem method. On the first and last day of travel, employees will receive 75% of the applicable daily per diem. When meals are included in conference or event registration, the daily per diem will be reduced accordingly.

V. MISCELLANEOUS EXPENSES
A. Expenses related to Town business will be reimbursed for actual telephone, fax, parking expenses, tolls, tipping, taxi, hotel wireless charges, or other reasonable expenses.

Miscellaneous expenses must be itemized, and receipts must be provided. Where receipts are not available, a signed declaration of expenditures may be accepted by the Administrative Services Director or designee at their discretion.

B. Incidental expenses ( fees and tips to porters, baggage carriers, hotel staff, etc.) are included within the GSA per diem allowance and will not be separately reimbursed, except when clearly outside the GSA definition.

Town of Los Altos Hills October 2025
Travel Policy 4

Page 221 of 647 ends

C. Personal expenses ( e. g. shoe shine, in -room entertainment, personal phone calls, traffic fines, etc.) are not reimbursable.

D. If a personal side trip is planned, the Town will reimburse not more than the advance purchase economy class airfare to and from the original destination. Any additional costs related to personal travel will not be reimbursed by the Town.

E. If a companion accompanies an employee, only the business cost incurred by the employee will be reimbursed. All costs incurred in addition to the employee costs will not be reimbursed by the Town.

VI. BUSINESS MEETING EXPENSES
A. Business meals are reimbursed at actual cost with itemized receipts, separate from the employee' s per diem allowance. The itemized meal receipts shall include the amount of the expense, the date and place of the expense, the business purpose, and who attended the business meeting.

B. Meals will only be reimbursed for the cost(s) of the eligible item on the meal receipt.

Overcharged amounts will not be reimbursed.

C. Meal reimbursement should be submitted within 30 business days of the meeting.

Employee

1. Discuss planned travel and expenses with immediate supervisor.

2. Obtain prior authorization for any nonstandard expenses ( i.e., rental car, travel by air, etc.) by filling out the Travel Authorization form located in :/ common/ LAH forms.

3. Submit requests for registration and any advances or prepaid items within the standard disbursement time period.

4. Within 30 business days after the employee' s return from a trip, a Statement of Travel Expenses ( travel and expense report) must be pled with the Finance Division complete with the proper signing authority. The form is located in:\ common\ LAH forms.

5. All Statement of Travel Expenses shall include copies of documentation of previous prepayments or advances made, including registration, airfare, hotel, training agenda, etc.

Town of Los Altos Hills October 2025
Travel Policy 5

Page 222 of 647 ends

6. When claiming per diem, employees must note the applicable GSA rate and location on the Statement of Travel Expenses. Receipts are not required for meals and incidental expenses reimbursed under the per diem allowance.

Finance

1. Receives completed Statement of Travel Expenses from department.

2. Reviews requested prepayments, advances and reimbursements related to travel. Checks the budget for consistency with budgeted funds.

3. Process Statement of Travel Expenses and provides payment for advances, prepayments or reimbursements.

Peter Pirnejad, City Manager
Cody Einfalt, Acting City Monoger
October 2025
Town of Los Altos Hills October 2025
Travel Policy 6

Page 223 of 647 ends

Town of Los Altos Hills October 2025
Travel Policy 1

TRAVEL AND EXPENSE POLICY

PURPOSE
Town travel should be for business and training purposes that is of value to the Town and its residents.

All expenses incurred while on Town business should constitute reasonable and practical use of public funds. When traveling, employees shall choose the most efficient, direct and economical travel options available.

POLICY
The purpose of this policy is to establish business travel guidelines for Town employees and City Council members that are fair, accountable, and transparent. This policy addresses the criteria for Town payment of travel expenses and/or advances incurred by the Town employee.

Councilmember travel reimbursements are also subject to state law provisions under Government Code §53232.3. In the event of any conflict between this policy and state law, the latter shall govern.

I. GENERAL GUILDELINES
A. Authorized expenses shall include, but are not limited to, authorized business expenses incurred while engaging and/or participating in the following activities and/or events, which meet the criteria listed below:

1. The seminar, meeting, function, certification training or conference is mandatory or necessary to accomplish key Town or employee goals and objectives. Such activities include, but are not limited to:
a. Participating in and attending meetings of regional, state and national organizations whose activities affect the Town’s interests. b. Attending educational seminars designed to improve skill and information levels.
c. Attending business meetings, functions of local civic or community organizations where there is a clear nexus between the event and Town employee duty, i.e., not purely social events.

ITEM 5M Attachment 4

Page 224 of 647 ends

Town of Los Altos Hills October 2025
Travel Policy 2

2. If the training location requires an overnight stay, efforts should be made to ensure no local option is available. If the employee is eligible for overtime or compensatory time accrual during the travel time and conference event, wages will be calculated in accordance with FLSA requirements.

3. Attendance at conferences, seminars, or training sessions must receive prior approval from the employee’s supervisor and Department Head. Participation must be directly related to the employee’s job duties and Town business needs and is subject to available funding and staffing levels. As a general guideline, conference attendance shall be limited to one per fiscal year for line staff, two for managers, and three for executive staff. Exceptions must be justified by business need and approved in advance by the City Manager or designee.

4. Registration fees will be fully paid by the Town, preferably by Town credit card. If a credit card payment is not feasible, the Town may issue a check directly to the vendor. Any discounts offered for early registration or attendance by additional people should be obtained whenever possible.

5. Out-of-state travel shall be authorized first by the department head and then by the City Manager.

6. Travel outside the continental United States—including Hawaii, Alaska, Guam, Puerto Rico, and other U.S. territories—shall be considered international travel and requires Department Head, City Manager and City Council approval.

7. Any City Council members requesting out-of-state travel or international travel for any event or activity shall be approved at a City Council meeting.

B. The following are examples, but not all inclusive, of personal expenses for which the Town will not reimburse the employee, even when incurred in conjunction with approved reimbursable expenses:
• Expenses incurred as a result of supplemental personal travel. • Political or charitable contributions or events.
• Family or companion expenses, including those related to child or pet care. • Entertainment expenses
• Meals for any person other than the employee.
• Non-mileage personal automobile expenses, including repairs, traffic citations, insurance, or gasoline.
• Personal losses incurred while on Town business.
• Inaccurate receipts that are greater than the reimbursable cost of the item. • Alcohol

Page 225 of 647 ends

Town of Los Altos Hills October 2025
Travel Policy 3
C. Payments for travel and expenses will be made on a reimbursement basis, with employees submitting a Statement of Travel Expenses and receipts after travel. Prepayments (e.g., conference registration, airfare, lodging) should be made directly to vendors whenever feasible. Cash advances to employees are strongly discouraged and may only be approved in exceptional circumstances by the City Manager or designee.

D. Reimbursement of expenses may be made only for Town employees; no reimbursement is allowed for non-employees accompanying the attendee.

E. All reimbursement claims or advances for travel and expenses (including registration) shall be accompanied by sufficient supporting documentation including original receipts, copies of registration forms, invoices, cancelled checks or notation for any receipts that are lost.

F. All claims for travel and expenses shall be signed by the employee’s supervisor and Department Head or designee.

II. TRANSPORTION
A. Airfare

1. Use of air, train, private automobile, or other mode of transportation should be selected based on the least expensive option for the Town. Government and group rates should be used when available.

2. Transportation costs to and from the authorized destination should not exceed advance purchase economy class airfare unless such fare is not available or impractical.

Employees are encouraged to inquire as to any government discount the airline may provide. The Town will not pay for upgrades (e.g., seat upgrades or early boarding options) unless approved by the City Manager or designee for a documented business, medical, or accessibility need. All approved upgrades must remain within economy class.

3. Travel reservations should be made as early as practicable to obtain the lowest reasonable fares, preferably at least 21 days in advance. Last-minute or imminent travel reservations should be avoided unless necessary for urgent Town business and approved by the City Manager or designee. When travel dates are uncertain, flexible or refundable tickets may be purchased with City Manager or designee approval if doing so is in the Town’s best interest and helps avoid potential cancellation costs.

B. Automobile

1. No allowance or reimbursement for transportation is authorized when a Town vehicle is used.

Page 226 of 647 ends

Town of Los Altos Hills October 2025
Travel Policy 4

2. When two (2) or more employees are traveling by vehicle, the employees should make every effort to travel together.

3. Automobile mileage will be reimbursed at the rate set by the Internal Revenue Service (IRS) in effect at the time of travel and will be reimbursed for the distance between home and the destination or work and the destination, whichever is less. Finance shall be responsible for determining the applicable rate at the time of travel. This amount does not include bridge and road tolls, which are reimbursable at actual rates. Any employee in a management position who receives a vehicle allowance is not eligible for mileage reimbursement. Mileage reimbursement should be submitted within thirty (30) days of travel.

4. If a personal vehicle is used to and from the airport, the actual mileage will be reimbursed. Parking at the airport will be reimbursed or a shuttle to and from the airport.

It is encouraged that the cheaper of the two options be used.

5. The necessity for a rental car must be established and authorized in advance by the City Manager or designee. Only economy car models may be rented unless the upgrade is provided at no additional cost to the Town. The electric/green option must be preferred if prices and convenience are similar. Prepaid gas is not to be selected, but optional insurance is required and will be reimbursed. Employees should refuel rental vehicles before returning them to avoid refueling premiums charged by rental companies. The employee is required to notify the Town’s Risk Manager and their supervisor, immediately, in the event of any incident or accident related to the rental vehicle. If and when available a police report should also be obtained if involved in a vehicle accident.

When 2 or more employees are attending the same training, the rental vehicle, if approved, should be shared.

C. Taxis/Shuttles

1. Whenever possible, hotel courtesy buses or local shuttle services should be used.

Taxi service or Ride Share should be used only when no other convenient, less costly transportation is available. The electric/green option must be preferred if prices and convenience are similar.

III. LODGING
A. No lodging expenses incurred by employees within a 50-mile radius will be reimbursed unless there are extenuating circumstances and approved prior by City Manager or designee approval.

B. Lodging expenses may be prepaid directly to the hotel or reimbursed. Prepayment or reimbursement will be limited to single occupant room rates. Lodging reimbursement shall not exceed conference hotel cost or host group rate with the exception the lodging is not available. No reimbursement will be made when lodging is at a family/friend’s residence.

Page 227 of 647 ends

Town of Los Altos Hills October 2025
Travel Policy 5
IV. MEAL COSTS
A. The Town will provide meal and incidental expense reimbursement on a per diem basis, consistent with the U.S. General Services Administration (GSA) rates in effect at the time and location of travel. Receipts are not required for meals and incidentals reimbursed under the per diem method. On the first and last day of travel, employees will receive 75% of the applicable daily per diem.

V. MISCELLANEOUS EXPENSES
A. Expenses related to Town business will be reimbursed for actual telephone, fax, parking expenses, tolls, tipping, taxi, hotel wireless charges, or other reasonable expenses.

Miscellaneous expenses must be itemized, and receipts must be provided. Where receipts are not available, a signed declaration of expenditures may be accepted by the Administrative Services Director or designee at their discretion.

B. Incidental expenses (fees and tips to porters, baggage carriers, hotel staff, etc.) are included within the GSA per diem allowance and will not be separately reimbursed, except when clearly outside the GSA definition.

C. Personal expenses (e.g. shoe shine, in-room entertainment, personal phone calls, traffic fines, etc.) are not reimbursable.

D. If a personal side trip is planned, the Town will reimburse not more than the advance purchase economy class airfare to and from the original destination. Any additional costs related to personal travel will not be reimbursed by the Town.

E. If a companion accompanies an employee, only the business cost incurred by the employee will be reimbursed. All costs incurred in addition to the employee costs will not be reimbursed by the Town.

VI. BUSINESS MEETING EXPENSES
A. Business meals are reimbursed at actual cost with itemized receipts, separate from the employee’s per diem allowance. Business meals shall not exceed the applicable GSA per-person rate plus 25%, including tax and tip, unless approved by the City Manager or designee. Business meals are limited to meetings held to discuss official Town matters with employees, officials, or representatives of other public agencies. The itemized meal receipts shall include the amount of the expense, the date and place of the expense, the business purpose, and who attended the business meeting.

B. Only reasonable and eligible meal costs supported by itemized receipts will be reimbursed; excessive or non-business-related charges will not be covered.

C. Meal reimbursement should be submitted within 30 business days of the meeting.

Page 228 of 647 ends

Town of Los Altos Hills October 2026
Travel Policy 6

PROCEDURE
Employee

1. Discuss planned travel and expenses with immediate supervisor.

2. Obtain prior authorization for any nonstandard expenses (i.e., rental car, travel by air, etc.) by filling out the Travel Authorization form located in :/common/LAH forms.

3. Submit requests for registration and any advances or prepaid items within the standard disbursement time period.

4. Within 30 business days after the employee’s return from a trip, a Statement of Travel Expenses (travel and expense report) must be filed with the Finance Division complete with the proper signing authority. The form is located in:\common\LAH forms.

5. All Statement of Travel Expenses shall include copies of documentation of previous prepayments or advances made, including registration, airfare, hotel, training agenda, etc.

6. When claiming per diem, employees must note the applicable GSA rate and location on the Statement of Travel Expenses. Receipts are not required for meals and incidental expenses reimbursed under the per diem allowance.

Finance

1. Receives completed Statement of Travel Expenses from department.

2. Reviews requested prepayments, advances and reimbursements related to travel. Checks the budget for consistency with budgeted funds.

3. Process Statement of Travel Expenses and provides payment for advances, prepayments or reimbursements.
_______________________
Cody Einfalt, City Manager
October 2026

Page 229 of 647 ends

TOWN OF LOS ALTOS HILLS November 12, 2026
Staff Report to the City Council
SUBJECT: PROVIDE STAFF DIRECTION ON THE TOWN’S RULE 20A UTILITY

UNDERGROUNDING PROJECT - PHASE TWO
FROM: WooJae Kim, Public Works Director
APPROVED: Cody Einfalt, City Manager
RECOMMENDATION:

Staff recommend that the City Council provide staff direction on the Town’s Rule 20A Utility Undergrounding Project - Phase Two.

BACKGROUND:

In 1967, the California Public Utilities Commission (CPUC) established the Electric Rule 20 program to support the conversion of overhead electric utility facilities to underground facilities.

Under Rule 20A, cities and counties receive work credits funded through PG&E ratepayer revenues to finance eligible undergrounding projects within locally established Underground Utility Districts (UUDs).

The Town has utilized Rule 20A credits to complete undergrounding projects at Byrne Preserve, Purissima Park, and, most recently, along El Monte Road, Elena Road, and Moody Road as part of the El Monte Fire Station Utility Undergrounding (Rule 20A) Project.

On December 9, 2025, the City Council adopted Resolution No. 86-25 (Attachment 1), accepting the El Monte Fire Station Utility Undergrounding Project, constructed by Phoenix Electric Company, as complete. In January 2026, AT&T and Comcast completed the removal of the remaining utility poles within the project area, completing the undergrounding work associated with the project.

Following completion of the El Monte Fire Station Utility Undergrounding Project, PG&E informed that the Town has a remaining Rule 20A work credit balance of $685,137.

In June 2023, the CPUC issued Decision 23-06-008, establishing December 31, 2033, as the sunset date for unused Rule 20A credits. Accordingly, the Town has been evaluating options for utilizing the remaining credits before they expire.

DISCUSSION:

The Town may use its remaining Rule 20A credits for an additional undergrounding project within its jurisdiction or explore the option of transferring credits to, or receiving credits from, Santa Clara County for use on an eligible undergrounding project. The CPUC Decision 21-06-013 ITEM 6A

Page 230 of 647 ends

Staff Report to City Council Page 2
Rule 20A Phase Two Project
November 12, 2026
discontinue the allocation of new Rule 20A work credits effective December 31, 2022, and prohibited the borrowing and purchasing of credits from other agencies. However, local agencies may transfer existing Rule 20A credits between their counties, subject to applicable program requirements.

At the August 20 City Council Meeting, Council directed staff to explore the option of transferring Rule 20A credits from and to Santa Clara County. If the County is able to grant the Rule 20A credits needed to the Town, the Town can explore additional undergrounding project within the existing El Monte Fire Station UUD established by Resolution No. 40-19 (Attachment 2), adopted on June 20, 2019. An alternative would be for the Town to transfer its remaining Rule 20A credits to the County for use on an eligible undergrounding project that could benefit the Town.

Following several discussions with the County Roads and Airports Department and correspondence with the County Supervisor’s Office, the Deputy Director of County Roads and Airports indicated that the County would be willing to consider transferring the necessary Rule 20A credits to the Town, subject to receiving additional information regarding the proposed project’s feasibility and the amount of credits required. The County reportedly has a remaining Rule 20A credit balance of approximately $13 million.

Phase 2 Rule 20A Project along Elena Road
Staff previously worked with Sanbell, the Town’s Rule 20A design consultant, to evaluate a potential phase two project involving approximately 300 linear feet of additional utility undergrounding along Elena Road. The estimated project cost is approximately $650,000, which is within the Town’s remaining Rule 20A work credit balance of $685,137.

However, the proposed 300-foot segment does not meet PG&E’s minimum project-length requirement of approximately 600 feet or one full city block. To meet this requirement, the Town would need to work with Sanbell to develop a conceptual design and engineer’s cost estimate for an approximately 600-foot undergrounding project along Elena Road and submit the proposal to PG&E for consideration.

The schematic below illustrates a potential 600-foot undergrounding project along Elena Road within the existing Underground Utility District (UUD).

Page 231 of 647 ends

Staff Report to City Council Page 3
Rule 20A Phase Two Project
November 12, 2026
Schematic Site Plan of 600-foot Rule 20A Project – Phase 2 Sanbell’s Proposal for Rule 20A Phase 2 Conceptual Design and Cost Estimate Sanbell has submitted a proposal for approximately $23,000 to prepare a conceptual design and engineer’s cost estimate for an approximately 600-foot undergrounding project along Elena Road and submit the project to PG&E for consideration (Attachment 3).

For the El Monte Fire Station Utility Undergrounding Project, the Town served as the joint trench lead agency, responsible for preparing the final design and construction documents and constructing the joint trench. The Town’s design and construction costs were reimbursed through PG&E’s Rule 20A credits and AT&T’s and Comcast’s respective utility undergrounding programs. Having the local agency serve as the joint trench lead provides greater control over the project schedule and can help expedite project delivery.

For the proposed Phase 2 project, staff recommend having PG&E serve as the joint trench lead to minimize the Town’s financial exposure in case PG&E does not approve and allocate funding for the project in time for completion before the December 31, 2033, Rule 20A credit sunset date.

If PG&E is unable to approve and budget the Phase 2 project for implementation before the sunset date, the Town may not be reimbursed for its design costs, including the $23,000 cost proposed for the conceptual design and cost estimate. Accordingly, having PG&E serve as the joint trench lead would help limit the Town’s financial risk by not having to commit additional funds to project development.

Page 232 of 647 ends

Staff Report to City Council Page 4
Rule 20A Phase Two Project
November 12, 2026
PG&E Project Backlog and Implementation Risks
The proposed Phase 2 project could provide an opportunity to use the Town’s remaining Rule 20A credits to further underground utilities along an important emergency evacuation route, assuming the County can transfer the remaining work credit needs. However, the project’s approval and timely implementation remain uncertain.

According to PG&E’s representative, more than 190 Rule 20A projects are currently in PG&E’s work plan queue. Due to its existing workload and available resources, PG&E indicated that newly proposed project from the Town would unlikely be budgeted into PG&E work plan and be completed before December 31, 2033, even if prioritized in accordance with the Town’s 2019 Underground Utility District (UUD) resolution.

Proceeding with the conceptual design would not guarantee PG&E’s approval or implementation of the project before the Town’s remaining Rule 20A credits expire. The Town could incur approximately $23,000 in design costs without the project ultimately proceeding or the Town recovering those costs in full.

City Council Direction
Staff are seeking City Council direction on whether to proceed with Sanbell’s proposed $23,000 scope of work to prepare a conceptual design and engineer’s cost estimate for an approximately 600-foot undergrounding project along Elena Road and submit the project to PG&E for consideration.

If the Council directs staff to proceed, staff will work with Sanbell and PG&E to refine the project scope, clarify applicable funding and reimbursement requirements, and explore opportunities to minimize the Town’s financial exposure. If the Council elects not to proceed, staff could continue exploring the potential transfer of the Town’s remaining Rule 20A credits to Santa Clara County, subject to the County’s and PG&E’s applicable requirements and approvals.

In considering whether to proceed, the Council may weigh the potential public-safety benefits of additional undergrounding along an emergency evacuation route against the uncertainty of project approval and completion before the sunset date, as well as the risk that the Town may incur design costs that cannot be recovered.

ENVIRONMENTAL REVIEW:

Rule 20A projects generally fall under Class 1 categorical exemption per Article 19 (Categorical Exemptions) section 15301(b) Existing Facilities of the California Environmental Quality Act (CEQA) guidelines for private and public owned utilities used to provide electric power or other public utility services.

Page 233 of 647 ends

Staff Report to City Council Page 5
Rule 20A Phase Two Project
November 12, 2026
2026-27 CITY COUNCIL WORK PLAN:

This action is identified on the 2026-27 City Council Work Plan under Public Works Department for “Underground Utilities – Rule 20A (Phase 2)” to determine the scoping for the phase 2 project to use the remaining Rule 20A credits.

FISCAL IMPACT:

The FY 2026–27 Operating and Capital Budget includes a remaining $276,873 in CIP/General Fund funding for the El Monte Fire Station Utility Undergrounding (Rule 20A) Project. The available project budget is sufficient to cover the approximately $23,000 cost of the proposed Rule 20A Phase 2 conceptual design and engineer’s cost estimate.

ATTACHMENTS

1. Resolution No. 86-25

2. Resolution No. 40-19

3. Sanbell Proposal for Rule 20A Phase 2

Page 234 of 647 ends

ITEM 6A, Attachment 1
RESOLUTION 86-25

RESOLUTION OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS

ACCEPTING THE EL MONTE FIRE STATION UTILITY UNDERGROUNDING (RULE 20A) PROJECT PERFORMED BY PHOENIX ELECTRIC COMPANY AS COMPLETE; AUTHORIZING THE RELEASE OF FINAL RETENTION TO THE CONTRACTOR; AND

DIRECTING THE CITY CLERK TO FILE A NOTICE OF COMPLETION WHEREAS, Rule 20A underground program allows cities and counties to utilize Rule 20A work credits to fund utility undergrounding projects at locally identified underground districts; and WHEREAS, the City Council adopted Resolution No. 40-19 on June 20, 2019, approving the formation of an Underground Utility District (UUD) around the El Monte Fire Station; and WHEREAS, the El Monte Fire Station Undergrounding (Rule 20A) Project was added to the Five- Year Capital Budget on June 20, 2020, and Town hired Sanbell (formerly known as Bellecci and Associates) in October 2020 to prepare the undergrounding composite plans and to assist with the coordination with PG&E and other utility companies; and WHEREAS, on April 15, 2024, the Town Council approved the Plans and Specifications for the project, authorized staff to advertise the project for a formal bid, and authorized the City Manager to award a construction contract to the lowest responsible bidder not to exceed $4,200,000, including a contingency fund for potential change orders; and
WHEREAS, after a formal bid process for construction of the project, Phoenix Electric Company (Phoenix) was determined to be the lowest responsible bidder, and the construction agreement with Phoenix was executed on June 3, 2024, for $3,868,742.50; and WHEREAS, construction started on June 26, 2024, and the work was completed under the terms of the contract on November 4, 2025; and
WHEREAS, the total project expenditure for the contracted work by Phoenix Electric Company is $4,119,489, which is below $4,200,000, the amount authorized by the Town Council; and WHEREAS, staff recommend that the City Council accept the El Monte Fire Station Undergrounding (Rule 20A) Project performed by Phoenix Electric Company as complete and allow the remittance of the five percent retention to the contractor 35 days following the project acceptance.

NOW, THEREFORE, BE IT RESOLVED, by the City Council of the Town of Los Altos Hills that:

1. The El Monte Fire Station Utility Undergrounding (Rule 20A) Project by Phoenix Electric Company is accepted as complete; and

2. Staff is authorized to-make the final-retention payment concerning the above-described work; and

3. The City Cleric is hereby directed to file the notice of the completion of said project with the County Recorder of the County of Santa Clara, within ten (10) days from the date of this Resolution.

RESOLUTION 86-25 ' Page 235 of 647
The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a regular meeting held on the 9th day of December 2025 by the following vote:

AYES: TANKHA, BHATEJA, MOK, SWAN, TYSON
NOES: NONE
ABSTAIN: NONE
ABSENT: NONE
Kant Tau
BY:

ATTEST: Kavita Tankha, Mayor
RESOLUTION 86-25 2 page 236 of 647
This Document is Recorded for the
Benefit of the Town , cif Los Altos Hills
and is Exempt from fee per Government
Code Sections 6103 and 27383
When Recorded, Mail to:

Attention: City Clerk i.

Town of Los Altos Hills
26379 Fremont Road
Los Altos Hills, CA 94022

NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that Phoenix Electric Company on June 3, 2024, entered into a contract for the El Monte Fire Station Utility Undergrounding (Rule 20A) Project, in Los Altos Hills, situated in Santa Clara County, with the Town of Los Altos Hills. Said improvements were completed in accordance with the Plans and Specifications adopted by the City Council and upon the terms and conditions set forth and identified by the written contract.

On the 9th day of December 2025, the work provided to be done under the contract was accepted as fully completed within the terms of the contract.

NOTICE IS FURTHER GIVEN that the public board for whom the above-described work was done is the City Council of the Town of Los Altos Hills, a municipal corporation of the State of California, and that the name and address of the political subdivision for which the above-described work was done is the Town of Los Altos Hills, State of California, Town Hall, 26379 Fremont Road, Los Altos Hills, California 94022.

NOTICE IS FURTHER GIVEN that the name of the contractor by whom the above-described work was done is as follows:

CONTRACTOR: Phoenix Construction
WooJae Kim
Public Works Director/Town Engineer
Town of Los Altos Hills
DATE
.....

Page 237 of 647 ends

I, Arika Birdsong -Miller, duly appointed City Cleric for the Town of Los Altos Hills, do hereby certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing is true and correct. r
WITNESS my hand and official seal.

Arika Birdsong-Miller, City Clerk
Date:

Place: Town Hall
Town of Los Altos Hills
26379 Fremont Road
• Los Altos Hills, CA 94022

Page 238 of 647 ends

RESOLUTION 40- 19
RESOLUTION OF THE CITY COUNCIL OF :THE TOWN OF LOS ALTOS HILLS

FOR THE FORMATION OF AN UNDERGROUND UTILITY DISTRICT IN THE

AREA AROUND THE EL MONTL FIDE STATION
WHEREAS, the California Public Utilities Commission ( CPUC) has authorized electric and telecommunication utilities to convert overhead utility lines and facilities to underground pursuant to Electric Rule 20 and Telecommunication Rule 32; and WHEREAS, pursuant to certain criteria, CPUC rules allow participating cities and counties to establish legislation authorizing the creation' of underground utility districts within which existing overhead electric distribution and telecommunication distribution and service facilities will be converted to underground; and
WHEREAS, the Town of Los Altos Hills, has adopted an ordinance, codified as Chapter 3 UNDERGROUND UTILITY DISTRICTS under Title 7 Public Works in the Town of Los Altos Hills Municipal Code, authorizing the City Council to designate -areas within which all existing overhead. poles, overhead wires and overhead equipment associated with the distribution of electric power, telecommunication services and cable television should be removed and replaced with underground wires and facilities; and WHEREAS, the Town in consultation with the Los Altos Hills County Fire District ( Fire District) has determined that the public necessity, health, safety, or welfare requires undergrounding the existing overhead utilities and removal of the utility poles in the area around the El Monte Fire Station. would allow the Town to maintain an unobstructed emergency route that would otherwise be blocked if the roadways were blocked by fallen utility poles; and
WHEREAS, the Director ofPublic Works for the Town, -of Los Altos Hills has consulted with the affected public utilities and such utilities have agreed that the proposed underground conversion district, designated an Underground Utility District in the area around the El Monte Fire Station and more particularly described in Exhibit A attached hereto and incorporated herein by reference, meets the criteria established by the rules of the CPUC, to wit, That the street or road or right- of-way is extensively used by the general public and carries a heavy volume of pedestrian or vehicular traffic, and That the street or road or right-of-way is considered an arterial street or major collector as - defined in the Governor' s Office of Planning and Research General Plan Guidelines, and
WHEREAS, each year the Town. of Los Altos Hills is notified by PG& E regarding the allocation of work credits for conversion of overhead electric distribution lines and facilities to underground, known as Rule 20A allocations; and
Resolution 40- 19 Page 1
ITEM 6A, Attachment 2

Page 239 of 647 ends

WHEREAS, the Director of Public Works for Town of Los Altos Hills has consulted with PG&E and determined that the City has accumulated Rule 20A work credits and PG&E has agreed that the City may borrow against future credits as part of the funding required for the proposed overhead to underground conversion project; and WHEREAS, the Town of Los Altos Hills and the affected utilities have agreed that each utility shall complete the engineering of their respective portion of the Overhead to Underground Utility Conversion Project in the area around the El Monte Fire Station; and WHEREAS, the Town of Los Altos Hills and the affected utilities have agreed that PG&E shall be responsible for preparation of the trench profile and composite drawings and that PG&E shall be designated as "trench lead" to manage trenching, installation of substructures, and pavement restoration and such other work; and
WHEREAS, the City Council of the Town of Los Altos Hills has now received the report from the Director of Public Works recommending that the area identified in Exhibit A should be designated as an underground utility district within which all existing overhead poles, overhead wires and overhead equipment associated with the distribution of electric power, telecommunication services and cable television should be removed and replaced with underground wires and facilities; and
WHEREAS, upon the recommendation of the Director of Public Works, the City Council of the Town of Los Altos Hills has determined that the proposed Underground Utility District in the area around the El Monte Fire Station is categorically exempt from environmental review pursuant to the California Environmental Quality Act; and WHEREAS, the Town of Los Altos Hills has notified all affected property owners within the proposed Underground Utility District in the area around the El Monte Fire Station and inviting same to attend a public hearing to discuss formation of the proposed district; and WHEREAS, the City Council of the Town of Los Altos Hills held public hearings at which time the Council did receive and consider the recommendation of the Director of Public Works and did hear any and all objections or protests that were raised by the owners of property within the above described district pertaining to designating this area an underground utility district;
NOW, THEREFORE, the City Council of the Town of Los Altos Hills does RESOLVE as follows:

SECTION 1. The public interest requires the removal of all existing utility poles, excepting those poles supporting streetlights or traffic signals, if applicable, overhead wires and associated overhead structures and installation of underground wires and facilities for supplying electric power, communication, or similar associated services within the areas as shown in Exhibit A, attached hereto, with such area being designated as the Underground Utility District in the area around the El Monte Fire Station; and Resolution 40-19 Page 240 of 647
SECTION 2. That the utility companies, cable television services and other affected services shall commence work on installation of underground facility installation in Underground Utility District in the area around the El Monte Fire Station and that as each phase of the project is complete and ready for conversion from overhead to underground utility facilities, all fronting property owners shall be notified, of the schedule for conversion of utility service lines; and
SECTION 3. The electric utility shall use the underground conversion allocation computed pursuant to decisions of the California Public Utilities Commission for the purpose of providing to each premises requiring it in an Underground Utility District in the area around the El Monte Fire Station a maximum of one hundred feet of individual electric service trenching and conductor (as well as backfill, paving and conduit, if required) and each other serving utility shall provide service trenching and conductor in accordance with its rules and tariffs on file with the California Public Utilities Commission or as required by its Franchise Agreement with the Town of Los Altos Hills, and
SECTION 4. The electric utility shall use said underground conversion allowance allocation, up to a maximum amount of $1500 per service entrance excluding permit fees, for the conversion of electric service panels to accept underground service in the Underground Utility District in the area around the El Monte Fire Station, and each property owner shall be financially responsible for any and all costs not covered by the electric utility for the installation and maintenance of the conduit and termination box located on, under or within any structure on the premises served pursuant to Section 7-3.09 of the Los Altos Hills Municipal Code; and
SECTION 5. That upon notification as specified in Section 2, all property owners in an Underground Utility District in the area around the El Monte Fire Station shall have underground electrical entrance facilities installed and inspected pursuant to the Town of Los Altos Hills Electrical Code and Chapter 3 UNDERGROUND UTILITY DISTRICTS under Title 7 Public Works in the Town of Los Altos Hills Municipal Code; and SECTION 6. That upon completion of the underground distribution system, the electrical utility is authorized to discontinue overhead electric service in the Underground Utility District; and
SECTION 7. That once all services have been converted from overhead to underground, the utility companies, cable television services and other affected services shall remove all poles (except as specified above) and associated overhead facilities in an Underground Utility District in the area around the El Monte Fire Station, by approximately December 31, 2027.

The above and foregoing Resolution was passed and adopted by the City Council of the Town of Los Altos Hills at a regular meeting held on the 20th day of June 2019 by the following vote:

Resolution 40-19 Page 241 of 647
AYES: Spreen, Wu, Corrigan, Tankha, Tyson
NOES: None
ABSTAIN: None
ABSENT: None
BY: Kosh
Roger Spreen, Mayor
ATTEST:

Deborah Padovan, City Clerk
Resolution 40-19 Page 4

Page 242 of 647 ends

Resolution 40- 19
Resolution 40- 19 Page 5
26101 SERRA
25779 26088 26045
-FE O.S.P.

JANE 26200
26066 26025 Page 243 of 647

EXHIBIT 'A'
25911 25755 26044

Page 5 ends

TOWN OF LOS ALTOS HILLS
25740
25769

PROPOSED UNDERGROUND

UTILITY DISTRICT IN THE

AREA AROUND THE EL
25751
Foothill College MONTE FIRE STATION
25625 12345
25594
25500
25617
25490 LEGEND
25581
25466 Parcels in District
25515 CRESCENT
25620
25440
2560012055 25473 Right-of-way in District
25441
ROAD
ENV 25420
12033 25325
25470 25005 12451
12011 25440 24985 24965
24940
GREEN 12080 ONEONTA
12359
12355
25342 25020
12020 25351 25400 25310 24925
12040 25380 25000
12060 24931
ROAD 12388

MOODY STONEBROOK COURT
25487 25463 12305
25503 25445 25449 12000 12365
12341 12321
12254 15525 LANE 12331
12264 12352
12100
25466 25484 25466 12020 12251
VeEL ADOBE 254311
25508 12354
12234 12355
25526 25440 12150
12243
ROAD WOOD 12200
25538 12362
25600 11600 25426 12215 12356
25070 12250
25555 11470
12237
25567 DRIVE 12175 12200 12231
25090 12155 ONSENOIS
25051 12211
« POND
7077 Koll Center Parkway, Suite 210 | Pleasanton, CA 94566 October 30th, 2026

VIA EMAIL
Mr. WooJae Kim
26379 Fremont Road
Los Altos Hills, CA 94022
Subject: Town of Los Altos Hills
Proposal for Engineering Services for Additional Rule 20A Undergrounding Project Near El Monte Fire Station
Dear Mr. Kim:

Sanbell-Bay Area is pleased to submit the following proposal to provide civil engineering services for preparing a construction cost estimate and coordination with Town Public Works officials for the proposed additional utility undergrounding improvements along Elena Road. Sanbell will develop a cost estimate for preparing the design for the installation of an additional undergrounding segment, as outlined below.

Limits of Work
The project location is:

Elena Road, between the Crescent Lane and Greenhills Court intersections.

Project Milestones
The overall project will include the following milestones:
 Draft Construction Cost Estimate
 Review Estimate with Town
 Revised Cost Estimate
 Draft Joint Trench Intent Drawing (“Lite”)
 Revised JT Intent Drawing
Optional Services
 Field Surveying for Revised JT Intent Drawing
 Site Visit for Mapping
 More Detailed Cost Estimate or Form B
 Added Utility Mapping JT Intent Drawing
Scope of Work
The Town of Los Altos Hills is interesting in undertaking a Rule 20A undergrounding project along Elena Road to extend the undergrounded joint trench constructed as part of the “El Monte Fire Station Utility Undergrounding (Rule 20A) Project” along Elena Road. See attached PDF “Attachment 1 - Concept Exhibit_Rev 1” for a preliminary project overview for the undergrounding project. The basic services portion of Sanbell’s scope of work is to provide an initial draft cost estimate for the joint trench concept, and to prepare a Joint Trench Intent Drawing (“Lite”). See detailed scope of work below.

ITEM 6A, Attachment 3

Page 244 of 647 ends
Page 2 of 2 ends

Proposal for Additional Rule 20A Undergrounding Project 1) Cost Estimate (Basic Services)
A. Sanbell will prepare a preliminary construction cost estimate for the design of a new utility undergrounding segment, per the exhibit “Attachment 1 - Concept Exhibit_Rev 1” (attached).

This preliminary estimate will take into consideration unit prices from the prior undergrounding project constructed for the Town of Los Altos Hills, along with anticipated conditions for the proposed project area. The cost estimate is not intended to be a detailed construction cost estimate due to the preliminary nature of the concept plan. Sanbell will use lump sum allowances to capture some of the work items not yet shown on the plans.

B. Sanbell will meet on Teams with Town Public Works officials, and the Town will provide comments on the Draft Cost Estimate.

C. Sanbell will update the Draft Cost Estimate based on Town comments, and will provide a Revised Cost Estimate to Town.

D. Sanbell will begin work on preparing the Joint Trench Intent Drawing (“Lite”). Joint Trench Intent Drawing (“Lite”) will be prepared with the previous base map from the “El Monte Fire Station Utility Undergrounding (Rule 20A) Project”. No additional surveying will be collected for the Joint Trench Intent Drawing (“Lite”). The base map will be extended using Google and CAD line work.

The Joint Trench Intent Drawing (“Lite”) will consist of a single plan sheet with joint trench line work to be submitted to PG&E along with introductory documents. The purpose of the Joint Trench Intent Drawing (“Lite”) is to provide a preliminary document to begin coordination with PG&E. After PG&E contact has been established and preliminary feedback has been collected, Sanbell will begin preparing the Revised Joint Trench Intent Drawing. 2) Optional Services
Following feedback from the Town and PG&E on the viability on this Rule 20 extension, Town may retain Sanbell to provide additional services for the preparation of the Revised Joint Trench Intent Drawing, including more detailed cost estimates/Form B documentation, site visits, field surveying, existing utilities mapping, under a separate agreement. 3) Proposed Fee / Budget
Our proposed project budget spreadsheet is attached for your review and comments. Thank you for considering Sanbell to be part of the additional Rule 20A Undergrounding Project. Please feel free to call me or Anoop Admal with any questions or comments at 925.687.4880 Sincerely,
Managing Principal
Daniel Leary, PE PTOE QSD

Page 245 of 647 ends

Client: Town of Los Altos Hills
Proposal for: Additional Rule 20A Undergrounding Project # TASKS ODCs Total
$320 $242 $228 $224 $184 $190 $176 $162 $146 $108 $272 $240 $184 $224 $173 1 Project Management/Coordination 2 1 3 $868 $868
2 Draft Construction Cost Estimate 1 3 8 12 $2,076 $2,076 3 Review of Draft Cost Estimate with Town 1 1 2 $322 $322 4 Revised Cost Estimate 1 4 5 $876 $876
5 Draft Joint Trench Intent Drawing ("Lite") 2 4 12 32 8 58 $9,808 $100 $9,908 6 Review JT Intent Drawing ("Lite") with Town 1 1 1 3 $666 $666 7 Revised JT Intent Drawing 4 8 20 6 38 $6,272 $6,272
8 PG&E Submittal with Letter 1 2 3 $508 $508
9 PG&E Coordination with Meeting 2 3 5 $854 $854
6 0 11 0 27 0 0 71 0 14 0 0 0 0 0 129 $22,250 $100 $22,350 10 Field Surveying for Revised JT Intent Drawing (if needed) TBD TBD 11 Site Visit for Mapping (if needed) TBD TBD
12 More detailed cost estimate or Form B (if needed) TBD TBD 13 Added Utility Mapping JT Intent Drawing (if needed) TBD TBD Notes:

Distribution of Hours may vary during the performance of the services Billing rates will have 4% escalation at each calendar year Project Manager Project Engineer I Staff Engineer IV Staff Engineer III Staff Surveyor II Survey Party Chief II Journyman Rodman

OPTIONAL SERVICES
Task Description Principal Engineer
Basic Services Staff Engineer II Staff Engineer I
Total Fee
10/30/2026 - v1 Engineering Tech/Intern Prof Land Surv II LABOR Senior Engineer II Other Direct Costs Total Hours Total Labor Costs Senior Engineer I Prof Land Surv I

Page 246 of 647 ends

ITEM 7A
THE TOWN OF LOS ALTOS HILLS November 12, 2026
Staff Report to the City Council
SUBJECT: Waive Reading and Introduce of an Ordinance Amending Chapter 10, "Construction Time Limits," of Title 8 of the Los Altos Hills Municipal Code FROM: Jay Bradford, Community Development Director
APPROVED: Cody Einfalt, City Manager
________________________________________________________________________________ RECOMMENDATION:

Staff recommends that the City Council (1) receive the staff report; (2) waive the first reading of the ordinance by title only; (3) introduce an ordinance repealing and replacing Title 8, Chapter 10 (Construction Time Limits) of the Los Altos Hills Municipal Code; and (4) provide any final direction regarding implementation, penalties, and transition provisions before the ordinance returns for second reading.

BACKGROUND:

Chapter 10 of Title 8, originally adopted through Ordinance No. 555 effective February 15, 2015, regulates the time permitted to complete construction projects. The current chapter assigns time limits based on project type and valuation, provides for up to two six-month administrative extensions, requires a construction completion deposit, establishes a daily penalty schedule and provides for appeals and nuisance enforcement. Its operation can require additional Council attention even when a project is progressing and has not generated unresolved enforcement concerns.

On September 17, 2026, the City Council considered a policy discussion and annotated draft addressing routine construction administration and escalation for problem projects. The attached first-reading text advances that policy framework (see Attachment 1). The meeting’s final motion and any specific amendments must be checked against the approved minutes or meeting recording before publication; the discussion topics below should not be presented as formally adopted Council direction until verified.

DISCUSSION:

Routine construction administration
The proposed replacement retains an objective initial construction period using one valuation-based table for projects subject to the chapter:

Construction valuation Base period
$0–$250,000 18 months
$250,001–$500,000 24 months

Page 247 of 647 ends

$500,001–$1,000,000 30 months
$1,000,001 and over 36 months
The Building Official may grant successive continuances of up to six months when the project is active, making reasonable progress and substantially compliant. A subsequent permit for the same project does not restart the construction clock. The administrative process remains separate from building-permit expiration requirements under the applicable Building Code.

Escalation of problem projects
The ordinance directs staff to assess actual unresolved conditions rather than the number of extensions alone. Potential triggers include sustained inactivity, substantiated nuisance conditions, material violations, repeated failure to satisfy continuance conditions and failure to follow an approved completion schedule. A complaint alone is not automatic grounds to deny a continuance.

Written notice, an opportunity to correct where appropriate, and documented findings precede discretionary escalation. Council referral is reserved for matters requiring Council-level remedies or substantial policy oversight.

Construction deposit, penalties and appeals
The draft retains the existing deposit formula (10 percent of the estimated remaining cost, not exceeding $50,000) unless Council separately directs changes. A deposit may be required upon the first continuance and is reconciled at closeout. The ordinance preserves a defined daily penalty schedule but provides for assessment and collection at project closeout, subject to earlier action when necessary. Continuances do not by itself waive a penalty. The draft describes administrative consideration of a documented request for adjustment or waiver, with decisions subject to appeal.

Legal review is needed to confirm penalty characterization, due process, the authority to adjust monetary penalties, and the relationship to applicable state building and housing law.

Existing permits and implementation
The proposed transition provision preserves final decisions and vested rights, does not retroactively increase amounts already finally assessed, and allows existing active projects to use the new continuance process after the effective date. Staff would update forms, notices and permit tracking before implementation. The draft does not authorize denial or revocation of a lawful housing entitlement solely because a Chapter 10 construction period has elapsed.

COUNCIL FEEDBACK AND POLICY ITEMS FOR FIRST READING:

The September 17 discussion materials identified three principal issues: whether active, compliant projects should remain administrative without a numerical extension cap; which objective conditions should prompt enforcement escalation or Council referral; and how time-based penalties should be calculated, adjusted and collected. The attached draft implements the staff-proposed two-track approach. Council is requested to confirm that this approach is consistent with its prior direction and identify any desired changes, particularly to the penalty trigger and waiver approval threshold.

Page 248 of 647 ends

FISCAL IMPACT:

Administrative review of routine continuances may reduce Council agenda preparation and hearing demands. Deposit and penalty collections may change in timing, and amounts collected will depend on project compliance and authorized adjustments. No new appropriation is requested by the first reading. Any fee or deposit schedule change should be considered through a separate resolution, if necessary.

ENVIRONMENTAL REVIEW:

Staff recommends that the City Council find the proposed Ordinance exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Sections 15061(b)(3) and 15308. The Ordinance establishes administrative and enforcement procedures intended to protect the environment and neighborhood conditions and would not result in any reasonably foreseeable significant physical environmental impacts. Therefore, no further environmental review is required.

ATTACHMENTS:

1. Proposed Ordinance Repealing and Replacing Title 8, Chapter 10, Construction Time Limits (First Reading Draft).

Page 249 of 647 ends

ITEM 7A, Attachment 1
ORDINANCE NO. XXX

AN ORDINANCE OF THE CITY COUNCIL OF THE TOWN OF LOS ALTOS HILLS REPEALING AND REPLACING CHAPTER 10 (CONSTRUCTION TIME LIMITS) OF TITLE 8 OF THE LOS ALTOS HILLS MUNICIPAL CODE
SECTION 1. Findings and Purpose.

The City Council finds that a predictable construction completion framework protects neighborhood health, safety and welfare; that active, compliant projects should be administered efficiently; and that projects causing substantiated nuisance conditions, material violations or extended inactivity require effective corrective and enforcement measures. The purpose of this ordinance is to distinguish routine continuances from problem-project escalation, preserve objective deadlines and provide an orderly closeout process.

SECTION 2. Chapter 10 of Title 8 Repealed and Replaced.

Chapter 10 (Construction Time Limits) of Title 8 of the Los Altos Hills Municipal Code is repealed in its entirety and replaced with the following:

CHAPTER 10. CONSTRUCTION TIME LIMITS
§ 8-10.01. Application and purpose.
(a) This chapter applies to construction of structures, additions, alterations, modifications, repairs and improvements requiring a building permit, subject to Section 8-10.02. (b) Construction-time compliance under this chapter is separate from permit expiration, renewal, inspection and other requirements of the applicable Building Code. No continuance under this chapter extends a building permit that has expired under the Building Code or authorizes work without a valid permit.
§ 8-10.02. Exemptions and excluded time.
(a) This chapter does not apply to work solely within an existing occupied building when the work produces no exterior evidence of incomplete construction and no substantiated unresolved exterior construction impact. An unverified complaint alone does not disqualify an otherwise exempt project.
(b) Upon written request and supporting evidence, the Building Official may exclude a documented period during which meaningful construction progress was prevented by a Town-issued stop-work order not attributable to the owner, a declared emergency, a utility or governmental action, or other extraordinary event outside the owner’s reasonable control. Ordinary scheduling, financing, labor availability and contractor disputes do not automatically qualify. The Building Official shall document the basis and revised date in the permit record. (c) Exclusions under this section do not excuse dangerous conditions, continuing violations or other enforceable requirements.

Page 250 of 647 ends

§ 8-10.03. Construction completion and valuation.
(a) Construction is complete when all permitted work, required site improvements, landscaping, condition-of-approval work, and construction debris removal are complete, and the Town has issued its required final inspection approval.
(b) The Building Official shall determine the project valuation at initial building permit issuance using the Town’s applicable valuation methodology and shall document the base completion deadline. Multiple permits forming part of one integrated project may be treated as one project for purposes of this chapter.
§ 8-10.04. Base construction time limits.
(a) Unless excluded time is approved pursuant to Section 8-10.02 or a continuance is granted under Section 8-10.05, the applicable base construction period begins on issuance of the initial building permit and is determined by valuation:

Construction valuation Base period
$0–$250,000 18 months
$250,001–$500,000 24 months
$500,001–$1,000,000 30 months
$1,000,001 and over 36 months
(b) A supplemental revised or replacement permit for the same project does not restart the base period. The Building Official may determine that truly separate work constitutes a separate project and shall document that determination. A Chapter 10 deadline does not automatically terminate a building permit; permit status remains governed by the Building Code. § 8-10.05. Administrative continuances.
(a) An owner may submit a written request for a continuance, ordinarily at least 14 calendar days before the current Chapter 10 deadline, with a status summary, progress records, remaining work, anticipated completion date and explanation of delays. The Building Official may accept a later request for good cause without waiving any applicable violation or penalty. (b) The Building Official may issue successive administrative continuances of no more than six months each when the project is active, making reasonable progress, substantially compliant with applicable requirements, and not subject to unresolved conditions warranting escalation under Section 8-10.09. No fixed number of continuances, by itself, requires Council referral. (c) A continuance may include a written completion schedule, interim milestones, inspections, site-maintenance requirements and other reasonable conditions relating to timely completion and neighborhood impacts. The Building Official shall provide a written decision, grounds, expiration date and appeal information.
(d) A substantiated unresolved nuisance, material violation, prolonged inactivity or repeated failure to meet continuance conditions may justify denial, conditions, corrective-action requirements or

Page 251 of 647 ends

referral under Section 8-10.09. Receipt of a complaint, without review and substantiation, is not alone sufficient for denial.
(e) Granting a continuance does not reset the original base period, waive accrued liability or waive any unrelated requirement of law. Any penalty adjustment is governed by Section 8-10.07. § 8-10.06. Construction completion deposit.
(a) Before the first continuance beyond the base period, the owner shall provide a refundable construction completion deposit or acceptable security in an amount equal to the lesser of 10 percent of the estimated cost of remaining work, as determined by the Building Official, or $50,000.

Existing security held by the Town may be credited against the requirement. (b) The deposit shall be held through final inspection and may be applied only to penalties, fees and costs legally due after the required notice and administrative process. The Town shall provide an accounting and return the unencumbered balance within 60 days after final reconciliation, subject to lawful holds or a pending appeal. The deposit is not a substitute for other security required by law. § 8-10.07. Penalties; calculation; adjustment and collection. (a) When work is not complete by the base period determined under Section 8-10.04, excluding any period approved under Section 8-10.02, a construction-time penalty may accrue notwithstanding administrative continuances. The default schedule is days 1–30, $0 per day; days 31–60, $400 per day; days 61–120, $600 per day; and day 121 and thereafter, $1,000 per day, with aggregate penalties under this section not to exceed $250,000 per project. The Town shall calculate days from the adjusted base deadline, rather than from Building Code permit expiration. (b) The Town may defer billing and collection of otherwise applicable penalties while the project is active and compliant under an approved continuance; deferral does not waive amounts. The Town may assess earlier when noncompliance or protection of the public interest warrants. The Town shall provide an itemized written assessment and an opportunity to request review before final collection or application of a deposit.
(c) The owner may submit a written request for reduction or waiver before final assessment or within 30 calendar days following notice of assessment. The Community Development Director may reduce or waive an assessment upon written findings addressing reasonable progress, good-faith efforts, circumstances beyond the owner’s control, documented hardship, nuisance impacts, unresolved violations, adherence to continuance conditions and the public interest. Any reduction or waiver exceeding $5,000 shall require City Council approval. (d) Penalty determinations may be appealed under Section 8-10.08. Nothing in this section authorizes duplicative penalties contrary to applicable law; the Town shall not collect any assessment determined unlawful on review.
§ 8-10.08. Appeals.
(a) The owner or other person directly aggrieved by a written determination under this chapter may appeal a Building Official decision to the Community Development Director within 10 calendar

Page 252 of 647 ends

days after service of the determination. The director shall issue a written decision following an opportunity for the appellant to present relevant evidence. (b) The director’s final administrative decision may be appealed to the City Council within 10 calendar days after written notice. The Town shall provide notice of a hearing at least 10 calendar days in advance, except where a longer period is required by law. The Council shall consider the administrative record and relevant evidence and issue a written decision. Applicable appeal fees, if any, shall be set by Council resolution and shall comply with controlling law. (c) Filing an appeal does not automatically stay an order addressing an imminent danger, a Building Code stop-work order, or another independently enforceable safety requirement. The Town may stay monetary collection pending resolution of a timely appeal. § 8-10.09. Public nuisance; corrective action; escalation. (a) A violation of this chapter that creates or perpetuates a public nuisance may be addressed under Title 6, Chapter 5 or other lawful remedies. Passage of a construction deadline alone does not establish that every project is a factual nuisance for all purposes. (b) The Building Official may require corrective action, additional conditions, a schedule or other authorized enforcement response upon finding: (1) a substantiated unresolved nuisance or material code violation; (2) suspension of meaningful work for more than 60 consecutive days without an adequate explanation or approved exclusion; (3) repeated unresolved violations involving work hours, parking, traffic, noise or site conditions; or (4) repeated failure to meet written continuance conditions.
(c) Except where immediate action is authorized by law to protect health or safety, staff shall provide written notice describing the factual basis and a reasonable opportunity to correct before referral for additional remedies. A matter may be referred to the Council where Council authority or review would materially assist resolution, including where more than two continuances have been granted and documented inadequate progress continues. Any hearing, assessment, abatement or other enforcement action shall follow applicable notice and due-process requirements. (d) Nothing in this chapter authorizes revocation or denial of a housing entitlement in violation of state law or limits other lawful enforcement authority. § 8-10.10. Transition and administration.
(a) This replacement chapter applies to requests for continuance and decisions made on or after its effective date, including active previously issued permits, to the extent permitted by law. A prior lawful deadline, final determination or penalty assessment shall not be retroactively modified except through a lawful review or adjustment process.
(b) The Building Official may adopt forms and procedures consistent with this chapter. If an earlier permit or approval contains conditions that cannot lawfully be modified by administrative action, those conditions remain effective until amended through the applicable process. (c) The Town shall provide reasonable notice of the revised continuance procedures to owners of active projects approaching their Chapter 10 deadlines.

Page 253 of 647 ends

SECTION 3. CEQA.

The City Council finds that the ordinance is exempt from the California Environmental Quality Act under Guidelines sections 15061(b)(3) and, where applicable, 15308, for the reasons stated in the staff report and accompanying administrative record. [City Attorney to confirm findings before introduction.]
SECTION 4. Severability.

If any provision or application of this ordinance is held invalid, the remainder shall remain effective to the extent it can be given effect without the invalid provision.

SECTION 5. Effective Date and Publication.

This ordinance shall take effect 30 days following final adoption, or as otherwise required by law.

The City Clerk shall cause publication or posting as required by law.

INTRODUCED at a regular meeting of the City Council of the Town of Los Altos Hills on November 12, 2026.

PASSED AND ADOPTED on __________ by the following vote:

AYES: __________
NOES: __________
ABSENT: __________
ABSTAIN: __________
_____________________________
Mayor
ATTEST: _____________________________
City Clerk
APPROVED AS TO FORM: _____________________________
City Attorney

Page 254 of 647 ends

ITEM 7B
TOWN OF LOS ALTOS HILLS November 12, 2026
Staff Report to the City Council
SUBJECT: Waive Reading and Introduce an Ordinance Adding Article 17 to Chapter 1 (Zoning) of Title 10 (Zoning and Site Development) of the Los Altos Hills Municipal Code to Adopt Inclusionary Housing Regulations Pursuant to Housing Element Program A-6
FROM: Jay Bradford, Community Development Department
APPROVED: Cody Einfalt, City Manager
_______________________________________________________________________________ RECOMMENDATION:

Staff recommends that the City Council waive the full reading and introduce an ordinance (see Attachment 1) adding Article 17 to Chapter 1 (Zoning) of Title 10 of the Los Altos Hills Municipal Code to establish inclusionary housing regulations pursuant to Housing Element Program A-6, subject to any modifications directed by the City Council regarding inclusionary requirement percentages.

BACKGROUND:

The Town’s certified Sixth Cycle Housing Element includes Program A-6, which calls for evaluating the financial feasibility of an inclusionary housing program and adopting appropriate affordable housing requirements if supported by that evaluation. Strategic Economics prepared the Residential Feasibility Study and Inclusionary Analysis to assess potential obligations for ownership and rental projects and the related financial effects.

The Planning Commission initially reviewed the analysis on April 2, 2026; the Finance Committee reviewed it on April 7; and the City Council provided policy direction on April 16. The Planning Commission discussed an ordinance framework on June 25 and considered the ordinance and public comments on August 6. The matter was continued to a planned August 13 special meeting, which was canceled. On November 5, 2026, the Planning Commission considered the additional analysis (see Attachment 2), draft ordinance, and supplemental responses to comments from the League of Women Voters (Attachment 5) and the California Housing Defense Fund (CalHDF) (Attachment 6).

The November 12 City Council meeting provides an opportunity to consider the first reading of the implementing ordinance following Planning Commission review.

DISCUSSION:

Proposed Inclusionary Housing Ordinance
The draft ordinance would establish requirements for qualifying new residential development to contribute to affordable housing through the provision of restricted affordable units or an authorized

Page 255 of 647 ends

alternative form of compliance. Its provisions address project applicability and exemptions, ownership and rental affordability requirements, in-lieu compliance, affordable housing agreements, administration and monitoring, and an Affordable Housing Fund.

The November 5 Planning Commission report presents a draft threshold of 10 or more units, while also requesting direction on exempting or reducing requirements for developments of 10 units or fewer. The report also identifies alternative inclusionary percentages and income targets.

Accordingly, the precise requirements presented for introduction should be reconciled with the Commission’s November 5 recommendation before publication of the final Council packet.

Feasibility Study and Proposed Policy Choices
Strategic Economics evaluated ownership and rental prototypes and analyzed the effect of inclusionary requirements on estimated development feasibility, see Attachment 3. The study recommended adoption of an inclusionary policy with alternatives and monitoring mechanisms for market and economic changes. The June 25 Planning Commission discussion supported a 15 percent requirement for ownership housing (7.5 percent low-income and 7.5 percent moderate-income) and for rental housing (7.5 percent very low-income and 7.5 percent low-income). Subsequent analysis tested an alternative retaining 15 percent for townhomes, reducing condominiums to 10 percent moderate-income, and reducing rentals to 10 percent (5 percent very low-income and 5 percent low-income).

The revised analysis (see Attachment 4) identifies administrative advantages in applying uniform ownership standards rather than different requirements for townhomes and condominiums, particularly for mixed-product projects. It also raises questions about the treatment of smaller developments and whether a single ownership and single rental in-lieu fee would be preferable to separate prototype-based fees. Rental prototypes were financially challenged even before applying an inclusionary requirement, supporting a calibrated approach and future program review.

The consultant’s modeled fee equivalents are analytical references, not adopted Town fees. Any final in-lieu fee schedule would require a separate Council action and should be consistent with the ordinance as introduced and adopted.

Town's Proposed Inclusionary Requirements and League of Women Voters Alternative The Town's initial proposal established a 15 percent inclusionary housing requirement for both ownership and rental developments. In response to financial feasibility concerns, the League of Women Voters recommended reduced requirements for condominiums and rental developments, while retaining the 15 percent requirement for townhomes. Strategic Economics evaluated these alternatives, summarized below.

Development Type Town's Initial Proposal League of Women Voters Alternative
Townhomes 15% (7.5% low-income; 7.5%
moderate-income) No change

Page 256 of 647 ends

Condominiums 15% (7.5% low-income; 7.5%
moderate-income) 10% moderate-income
Rental housing 15% (7.5% very low-income;

7.5% low-income)
10% (5% very low-income; 5%
low-income)
The supplemental economic analysis found that the reduced condominium requirement improved modeled financial feasibility. The lower rental requirement reduced the inclusionary obligation but did not make the rental prototypes financially feasible under the study's market assumptions. The revised analysis also recommended considering a uniform ownership standard rather than different requirements for townhomes and condominiums to simplify implementation. These alternatives were presented to the Planning Commission on November 5, 2026, for consideration and recommendation to the City Council.

Planning Commission Recommendation — November 5, 2026
At its November 5, 2026, meeting, the Planning Commission voted 5-0 to adopt the resolution and recommend it to Council for reading. The Commission recommended inclusionary thresholds; ownership affordability of 10% overall broken down between 5% low + 5% moderate, rental of 5% low + 5% very low. They also confirmed the 10-unit multifamily minimum. Ultimately adopting a resolution recommending that the City Council adopt an ordinance amending Title 10, Chapter 1, to add Article 18, Inclusionary Housing Ordinance, implementing Housing Element Program A-6, incorporating the Commission’s selected requirements.

Council Consideration and Next Steps
At this first reading, the City Council may introduce the ordinance as presented, introduce it with revisions, or direct further changes before introduction. If introduced, the ordinance would return for a second reading and potential adoption at a subsequent meeting. A separate resolution establishing any inclusionary in-lieu fees would be scheduled as appropriate after the Council confirms the applicable requirements and methodology.

ENVIRONMENTAL REVIEW:

Staff recommends that the City Council find the proposed Ordinance exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15061(b)(3). The Ordinance establishes a regulatory framework, does not approve any specific development or authorize physical construction, and would not result in any reasonably foreseeable significant physical environmental impacts. Therefore, no further environmental review is required.

FISCAL IMPACT:

The ordinance would establish an inclusionary housing program and create administrative responsibilities for reviewing compliance and monitoring affordable housing restrictions. Where authorized and subsequently established by Council resolution, in-lieu fee revenues would be deposited into the Town’s Affordable Housing Fund for eligible affordable housing purposes. Actual

Page 257 of 647 ends

administrative costs and revenues will depend on future development activity; adoption of the ordinance alone does not establish a final fee schedule.

ATTACHMENTS:

1. Ordinance Adding Article 17 to Chapter 1 of Title 10 (for First Reading)

2. Planning Commission Staff Report (November 5, 2026)

3. Strategic Economics Residential Feasibility Study and Inclusionary Analysis (October 30, 2026)

4. Strategic Economics Additional Policy Scenario (October 30, 2026)

5. Public Comment - League of Women Voters Letter (August 6, 2026)

6. Public Comment – CalHDF Letter (August 5, 2026)

Page 258 of 647 ends
Page 1 of 15 ends

ORDINANCE NO. XXX
AN ORDINANCE OF THE TOWN OF LOS ALTOS HILLS AMENDING TITLE 10 (ZONING AND SITE DEVELOPMENT) OF THE LOS ALTOS HILLS

MUNICIPAL CODE TO ADOPT AN INCLUSIONARY HOUSING ORDINANCE IN ACCORDANCE WITH HOUSING ELEMENT PROGRAM A-6
WHEREAS, California Housing Element Law (Gov. Code §65580 et seq.) requires housing elements to assess housing needs, identify inventory of resources, and analyze potential constraints relevant to meeting a jurisdiction’s Regional Housing Need Allocation (RHNA) obligation and for preserving, improving, and developing housing. This includes an analysis of potential and actual governmental constraints upon the maintenance, improvement, or development of housing for all income levels, and inclusion of goals, programs and policies to promote and incentivize housing opportunities; and
WHEREAS, the adopted and state-certified 2023-2031 Housing Element (“Housing Element”) of the Town of Los Altos Hills (“Town”) contains numerous goals, policies and programs to meet its RHNA obligations, including an inventory of sites in the Town suitable to accommodate housing units at various income levels under RHNA, programs to rezone such sites to multi-family zoning districts to accommodate RHNA units and to ensure that parcels would be developed at appropriate minimum densities, and to streamline residential development projects and promote housing opportunities and mobility; and
WHEREAS, the availability of housing is a substantial concern for individuals of all demographics, ages, and economic backgrounds in communities throughout the State of California.

Inclusionary housing regulations, which requires developers for residential or mixed use projects to provide a certain percentage of new housing units at prices affordable to lower-income or moderate-income households, provide for below market rate housing with market rate residential developments, providing housing to a range of income levels; and
WHEREAS, Program A-6 of the Housing Element states that the Town shall conduct an inclusionary zoning feasibility study to identify appropriate inclusionary requirements that will not constrain housing production. Upon a demonstration of feasibility, the Town will develop and amend its Zoning Ordinance to establish inclusionary housing requirements so that new developments reserve up to 15 percent of the total units for lower- and moderate-income households; and WHEREAS, the Town participated in a multi-jurisdictional feasibility analysis process through the Santa Clara County Planning Collaborative, and subsequently retained Strategic Economics to prepare a Residential Feasibility Study and Inclusionary Housing Analysis (“Feasibility Study”), prepared and revised as of October 2026, to evaluate market conditions, economic trends, and financial feasibility of ownership and rental housing types in Los Altos Hills, and to assess how various inclusionary housing requirements could affect future development; and WHEREAS, the Feasibility Study concluded that an inclusionary policy may be established for both ownership and rental residential projects in Los Altos Hills but also recommended the Town to evaluate market conditions, the size of future developments, and changes in potential development scenarios, and review and adjust its policies as appropriate to accommodate development. The Feasibility Study analyzed market conditions and potential challenges in a largely untested multi-family market in Los Altos Hills, concluded that feasibility for below-market rate housing is largely ITEM 7B, Attachment 1

Page 259 of 647 ends
Page 2 of 15 ends

driven by market conditions, and recognized that an inclusionary policy in and of itself does not render affordable housing infeasible beyond constraints coming from market conditions. The Study recommended the Town adopt an inclusionary policy as well as an in-lieu fee, while remaining conservative in its applicable and include mechanisms to allow alternative options and to continue monitoring changes in economic circumstances and implement any necessary adjustments; and WHEREAS, scenarios presented in the draft Feasibility Study and its recommendations were presented to the Planning Commission during a duly noticed study session on April 2, 2026, and June 2, 2026, and to the City Council during a separate duly noticed study session on April 16, 2026, for feedback and direction. At all three meetings, the Planning Commission and City Council received written and oral public comments, and provided various policy directions; and WHEREAS, based on the final Feasibility Study, included with the accompanying April 16, 2026, staff report to the City Council, and feedback received during the above-mentioned study sessions, the Town has prepared this Ordinance amending Title 10 of the Los Altos Hills Municipal Code to adopt an Inclusionary Housing Ordinance that implements Program A-6 (the “Ordinance”), consistent with the Housing Element and state housing laws; and WHEREAS, although adoption of an inclusionary ordinance is an exercise of the Town’s police powers, as expressly permitted by statute and case law, and does not require the Town to demonstrate a “nexus” between the ordinance and its goals or prove feasibility thereof, the Town has incorporated the recommendations from the Feasibility Study in establishing the inclusionary requirement and in-lieu fees under the Ordinance, and has included both a waiver and adjustment process as well as a monitoring/evaluation component in the Ordinance to track market conditions for any necessary adjustments to its inclusionary program, as well as alternative options for development projects to comply with the inclusionary requirements therein; and WHEREAS, the Legislature and the courts have long recognized that local inclusionary ordinances serve legitimate purposes of increasing the number of affordable housing units to address the locality’s current and future housing needs, and assuring new affordable units would be distributed throughout the local jurisdictions as part of mixed-income developments in order to obtain the benefits that flow from economically diverse communities and avoid the problems that have historically been associated with isolated low income housing (California Building Industry Assn. v.

City of San Jose (2015) 61 Cal.4th 435); additionally, Government Code section 65850(g) also specifically permits local governments to require a rental housing project to include a certain percentage of affordable rental units to be occupied by households for moderate, lower, very low, or extremely-low income; and
WHEREAS, inclusionary housing programs are a recognized and effective method of increasing the supply of affordable housing while integrating affordable units within market-rate developments. Requiring qualifying residential developments to provide affordable housing or approved alternatives advances important public purposes, including reducing economic segregation, promoting housing opportunity, and implementing the Housing Element; and WHEREAS, the proposed Ordinance is consistent with State Density Bonus Law as development projects may designate units to satisfy both the requirements in this Ordinance and State Density Bonus Law, consistent with Government Code section 65915(o)(9)(A) and does not place a greater burden on developer than is permissible under State Density Bonus Law; and

Page 260 of 647 ends
Page 3 of 15 ends

WHEREAS, the Ordinance does not establish a residential impact fee or development impact fee within the meaning of the Mitigation Fee Act (Government Code section 66000 et seq.); and WHEREAS, under the California Environmental Quality Act (“CEQA”), CEQA only applies to projects which have the potential for causing a significant effect on the environment. CEQA Guidelines section 15061(b)(3) provides that CEQA does not apply to activities that would not have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA; and
WHEREAS, on August 6, 2026, the Los Altos Hills Planning Commission held a public hearing, which public hearing was opened and was then continued to August 13, 2026, and then rescheduled to November 5, 2026, to consider a recommendation to the Los Altos Hills City Council regarding the proposed Ordinance. At the public hearing, the Planning Commission reviewed and carefully considered all testimony, comments, and evidence presented in the record and during the hearing; and
WHEREAS, at its November 5, 2026, meeting, the Planning Commission by Resolution recommended the City Council adopt the Ordinance; and
WHEREAS, on November 12, 2026, the Los Altos Hills City Council held a public hearing to consider proposed Ordinance and the Planning Commission recommendation. At the public hearing, the City Council reviewed and carefully considered the proposed Ordinance, and all related testimony and evidence presented in the record and during the hearing. All interested parties were provided with an opportunity to participate and be heard.

NOW, THEREFORE, the City Council of the Town of Los Altos Hills does hereby ordain as follows:

SECTION I. FINDINGS.

Based on the entirety of the record before it, which includes, without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq. (collectively, “CEQA”); the Los Altos Hills General Plan and Housing Element; the Los Altos Hills Municipal Code; all reports, minutes, and public testimony submitted as part of the Planning Commission’s June 25, August 13, and November 5, 2026 public hearing and the City Council’s November 12, 2026 public hearing, and any and all other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City Council of the Town of Los Altos Hills hereby finds as follows:

1. All recitals above are true, correct, incorporated herein and made a part hereof.

2. The documents and other material constituting the record for these proceedings are located at the Community Development Department for the Town of Los Altos Hills, 26379 Fremont Road, Los Altos Hills, and in the custody of the Community Development Director.

3. This Ordinance is exempt from CEQA pursuant CEQA Guidelines section 15061(b)(3) as CEQA only applies to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to

Page 261 of 647 ends
Page 4 of 15 ends

CEQA. This Ordinance establishes an inclusionary housing program to promote affordable housing and incentivizing development opportunities, with alternative means of compliance or waiver, consistent with state law and the Housing Element. However, it does not approve any projects, grant any entitlements, or make physical changes to the environment. As such, this Ordinance is a regulatory act taken by the Town and does not physically change the environment. Therefore, it is exempt from CEQA as it does not have the potential for causing a significant effect on the environment.

4. This Ordinance was prepared and adopted in accordance with the Planning and Zoning Law (Government Code, sections 65853-65860) and meets all of the requirements thereunder.

5. This Ordinance is consistent with and supports the General Plan by implementing housing goals, programs and strategies in the Housing Element, including but not limited to Program A-6. This Ordinance does not burden or constrain housing development, but is consistent with Program A-6, and supports the Town’s goals, policies and programs to incentivize housing, promote affordability, and reduce potential constraints. It also allows the Town to comply with relevant state housing laws.

SECTION II. AMENDMENT.

1. Additions to Title 10 “Zoning and Site Development” of the Municipal Code.

A new Article 18, “Inclusionary Housing Ordinance” is hereby added to Title 10, Chapter 1 of the Municipal Code to read as follows. Other chapters, articles, sections, subsections, paragraphs and texts in Title 10 are not amended and shall continue in full force and effect.

ARTICLE 18

INCLUSIONARY HOUSING ORDINANCE
§ 10-1.1801 Purpose and Intent
§ 10-1.1802 Definitions
§ 10-1.1803 Inclusionary Units or Fee Required
§ 10-1.1804 Number of Inclusionary Units
§ 10-1.1805 Affordable Housing In-Lieu Fee
§ 10-1.1806 Alternatives
§ 10-1.1807 Inclusionary Unit General Requirements
§ 10-1.1808 Inclusionary Housing Application and Agreement § 10-1.1809 Adjustments and Waiver of Requirements; Incentives § 10-1.1810 Affordable Housing Fund
§ 10-1.1811 Administration and Enforcement
§ 10-1.1812 Severability
§ 10-1.1801 Purpose and Intent.

The purpose of this article is to facilitate the development and availability of housing affordable to a broad range of households with varying income levels within the Town to meet current and future affordable housing needs. Provision of inclusionary units within new residential developments will assure that new affordable housing units are distributed throughout the Town to promote affordable housing opportunities, housing mobility and housing choices. It is intended in part to implement state policy that declares that local governments have a responsibility to exercise their powers to facilitate

Page 262 of 647 ends
Page 5 of 15 ends

the development of housing to adequately provide for the housing needs of all economic segments of the community, as stated in Government Code Section 65580.

This article is also intended to implement the Housing Element of the General Plan which calls for the continued implementation of an inclusionary housing program to require either production of affordable housing at moderate, low, and very low income levels; payment of in-lieu fees, or alternative means of compliance to support construction of affordable housing units. This article further intends to establish an inclusionary program that is responsive to changing housing market conditions through periodic evaluation and amendment as necessary.

This article establishes minimum affordable housing requirements applicable to qualifying residential developments. Nothing herein shall limit the applicability of other federal, state, regional, or local housing regulations, including but not limited to the California Density Bonus Law, fair housing requirements, or affordability requirements imposed through funding agreements or other governmental programs.

This article shall be known and cited as the "Inclusionary Housing Ordinance of the Town of Los Altos Hills" or " Inclusionary Housing Ordinance."
§ 10-1.1802 Definitions.

The definitions contained in Section 10-1.202 shall apply to the provisions of this article.

Notwithstanding the foregoing, the following definitions shall apply only to this article.

City Council means the City Council of the Town of Los Altos Hills.

Deed Restriction means a recorded covenant ensuring continued affordability of an affordable housing unit for the required affordability period.

In-Lieu Fee means a monetary payment accepted by the Town in partial or complete satisfaction of an inclusionary housing obligation where expressly authorized by this article.

Moderate-Income, Low-Income, and Very Low-Income shall have the meanings established under California Health and Safety Code Sections 50079.5, 50093, and related provisions, as may be amended.

Ownership Housing Development or ownership project means a residential development consisting of dwelling units intended for individual ownership through fee simple title, condominium ownership, stock cooperative, community apartment project, or other ownership tenure recognized by law.

Rental Housing Development or rental project means a residential development in which dwelling units are intended primarily for lease or rental occupancy.

Residential Development or residential development project means any project that includes the construction of ten (10) or more dwelling units.
§ 10-1.1803 Inclusionary Units or Fee Required.

Page 263 of 647 ends
Page 6 of 15 ends

Any new residential development with dwelling units intended or designed for permanent occupancy shall be developed to provide affordable housing units to very low-, low-, moderate-, and above moderate-income households and/or pay housing in-lieu fees in accordance with the requirements, policies and procedures specified in this section. The use of the term “developer” in this Article shall include the developer, property owner, or applicant of a development project, as the case may be. (a) Requirement- Ownership Housing Development. All ownership projects shall either include the number of inclusionary units required under Section 10.1-1804 or pay the in-lieu fee required under Section 10-1.1805, unless an alternative is proposed by the developer and approved as described in Section 10.1-1806. No application for a rezoning, tentative map, parcel map, conditional use permit, conditional development permit, site development permit, or building permit shall be approved, nor shall any such ownership project be constructed or condominium conversion approved, without compliance with this Article. (b) Requirement- Rental Housing Development. All rental projects shall either include the number of inclusionary units required under Section 10.1-1804 or pay the in-lieu fee required under Section 10-1.1805, unless an alternative is proposed by the developer and approved as described in Section 10-1.1806. No application for a rezoning, tentative map, parcel map, conditional use permit, conditional development permit, site development permit, or building permit shall be approved, nor shall any such ownership project be constructed or condominium conversion approved, without compliance with this Article.
(c) Exemptions. Notwithstanding subsections (a) and (b) above, this Article shall not apply to following:

1. Accessory dwelling units and junior accessory dwelling units.

2. SB 9 Units and Urban Lot Splits.

3. Density bonus units for which the project is eligible pursuant to State Density Bonus Law (Government Code Section 65915) and Article 17 of this Chapter.

4. Emergency shelters, supportive housing, transitional housing, and other housing developments that are exempted under applicable state law.

5. Replacement dwelling units that do not increase the number of residential units on a property.
§ 10-1.1804 Number of Inclusionary Units.

The required affordable housing obligation shall be calculated as a percentage of the total number of dwelling units within the residential development, excluding any accessory dwelling units or other units exempted under this Article.
(a) New Ownership Housing Developments. The developer of an ownership project shall include the following:

1. Five percent (5%) of the dwelling units as moderate income ownership units; and

2. Five percent (5%) of the dwelling units as low income ownership units.

Notwithstanding subsection (c) of this section, a minimum of one (1) inclusionary ownership dwelling unit shall be provided per project.

Page 264 of 647 ends
Page 7 of 15 ends

(b) New Rental Housing Developments. The developer of a rental project shall include the following:

1. Five percent (5%) of the dwelling units as low income rental units; and

2. Five percent (5%) of the dwelling units as very low income rental units. (b) Fractional Units. When the application of the percentages specified above results in a number that includes a fraction, the fraction shall be rounded up to the next whole number if the fraction is seven-tenths (0.7) or more. If the result includes a fraction below seven-tenths (0.7), the developer shall have the option of rounding up to the next whole number and providing the inclusionary unit on site, or paying a fee in lieu of providing an additional inclusionary unit. The in-lieu fee shall be calculated in accordance with Section 10-1.1805.
(c) Blended Targeted Income Levels. The developer may request that the project include inclusionary units that are targeted to a mix of income levels (moderate, low and very low) instead of just to one (1) income level. The final decision regarding the mix of targeted income levels shall be made by the City Council or Site Development Authority.
(d) Alternative Affordability Thresholds. If a developer is proposing to set aside units in a lower tier of affordability levels than those shown in 10-1.1804 subsections (a) and (b), the developer may use said affordable units to satisfy the inclusionary unit requirements listed therein. § 10-1.1805 Affordable Housing In-Lieu Fee.
(a) A fee may be paid in lieu of providing inclusionary units in an ownership project, inclusionary units in a rental project, and fractional inclusionary units below seven-tenths (0.7) of a unit. (b) Notwithstanding any other provision of this Article, to the extent that an ownership project or a rental project involves the demolition of existing dwelling units at a ratio of one-half (0.5) or greater to the construction of new dwelling units, the affordable housing in-lieu fee and the requirements to provide inclusionary units shall be based upon the number of net new dwelling units to be constructed.
(c) The City Council shall, from time to time, adopt a resolution setting forth the amount of the in-lieu fees. (d) Fractional in-lieu fees shall be calculated as follows: the per square foot in-lieu fee divided by the applicable inclusionary requirement times the average square feet of a unit in the development times the fractional unit.
(e) All fees shall be paid by the developer prior to issuance of a building permit for any residential structure in the development project or as determined by the residential development project’s adopted conditions of approval. For residential development projects constructed in phases, in-lieu fees shall be paid prior to issuance of each building permit in the proportion that the phase bears to the overall residential development project.
(f) The in-lieu fees shall not exceed the difference in revenue per square foot between a project with all market rate units and a project with the required affordable units, as may be further specified and adjusted by an in-lieu fee analysis prepared by the Town.

Page 265 of 647 ends
Page 8 of 15 ends

§ 10-1.1806 Alternatives.

The developer may propose an alternative means of compliance with this article instead of provision of inclusionary units or payment of an in-lieu fee according to the following provisions, in the order of the Town’s preference. All alternatives require City Council approval unless otherwise provided for below.
(a) Off-Site Construction of Inclusionary Units. A developer may construct the affordable units not physically within the development in lieu of constructing some or all of the affordable units within the development, with the approval of the City Council, if the City Council finds:

1. Construction of the units off site in lieu of constructing units on site is consistent with the Article’s goal of creating, preserving, maintaining, and protecting housing for very low-, low-and moderate-income households.

2. Units to be constructed off site are consistent with Section 10-1.1804.

3. It would be infeasible or impractical to construct affordable units on site.

4. Conditions of approval for the project require that the off-site affordable units would be governed by the terms of a deed restriction and, if applicable, rental restrictions similar to that used for the on-site affordable units.

5. Conditions of approval for the project, or other security such as a cash deposit, bond, or letter of credit, are adequate to require the construction of the off-site affordable units concurrently with the completion of the construction of the residential development or within a reasonable period (not to exceed five years).
(b) Partial In-Lieu Fee. The developer of a residential development project may request to pay the in-lieu fee for a portion of the required units. In this case, the per square foot fee would be decreased equal to the proportion of the required percentage of inclusionary units being provided in accordance with Section 10-1.1804. The final decision regarding the mix of targeted income levels shall be made by the City Council or Site Development Authority, as applicable. (c) Land Dedication. In lieu of building inclusionary units, the developer may dedicate to the Town or to Town-designated local nonprofit housing developer, if the City Council finds:

1. Dedication of land in lieu of constructing units is consistent with this Article’s goal of creating, preserving, maintaining, and protecting housing for very low-, low-and moderate-income households.

2. The dedicated land will be conveyed free and clear of liens, encumbrances, and title defects.

3. The dedicated land is of sufficient size to construct the number of units that the developer would otherwise be required to construct by Section 10-1.1804, based on the size of lots in the subdivision for which the developer is meeting its obligation, and is appropriately zoned for development at the density described in Government Code Section 65583.2 (c)(3).

4. The dedicated land has all of the permits and approvals as set forth under Government Code

Page 266 of 647 ends
Page 9 of 15 ends

section 65915(g)(2)(D).

5. The dedicated land is useable for its intended purpose, is free of toxic substances and contaminated soils, and is fully improved, with infrastructure, adjacent utilities, grading, and all development-impact fees paid excluding any inclusionary zoning ordinance fees.

Acceptance of land pursuant to this subsection does not constitute approval of any rezoning, surplus land determination, or legislative amendments required for the land. If any legislative action, including rezoning, is required, such action shall occur pursuant to applicable Municipal Code and state law requirements.
(d) Provision of Moderate Income Rental Inclusionary Units. A developer of a rental development project may propose to provide inclusionary units affordable to moderate income households. Such a proposal would include a percentage of moderate income units proportionally higher than the percent required for low income rental units. The final decision regarding the inclusion of moderate income rental units shall be made by the City Council or Site Development Authority, as applicable.
§ 10-1.1807 Inclusionary Unit General Requirements.
(a) Design and Distribution. Inclusionary units must be evenly dispersed throughout a residential development project and be comparable in construction quality and exterior design to the market rate units. The inclusionary units must have access to all on-site amenities. Inclusionary units shall reflect the range of numbers of bedrooms provided in the project as a whole and shall not be distinguished by exterior design, construction, or materials. (b) Timing. All inclusionary units must be constructed concurrently with or prior to the construction of market rate units or development. In phased developments, inclusionary units may be constructed and occupied in proportion to the number of units in each phase of the residential development project. The City Manager or designee shall be authorized to, upon request of developer, determine whether there are extenuating circumstances exist that make concurrent construction infeasible or impractical.
(c) Terms of Affordability. Rental inclusionary units must remain affordable for fifty-five (55) years, as documented through an affordable housing agreement recorded against the property. Ownership inclusionary units must remain affordable for forty-five (45) years pursuant to an affordable housing agreement recorded against the property.
(d) Unit Mix. The unit mix (i.e., the number of bedrooms per unit) of the inclusionary units shall be in the same proportion as the unit mix of the market rate units. For example, if a project has ten (10) two (2) bedroom units and twenty (20) one (1) bedroom units and is required to include three (3) inclusionary units, then the inclusionary units must consist of one (1) two (2) bedroom units and two (2) one (1) bedroom units. If only one (1) inclusionary unit is required and the other units in the project have various numbers of bedrooms, the developer may select the number of bedrooms for that unit. If inclusionary units cannot mathematically be exactly proportioned in accordance with the market rate units, the unit mix shall be determined by the City Council or Site Development Authority.
(e) Location of Inclusionary Units. Except as provided in Section 10-1.1806, all inclusionary units

Page 267 of 647 ends
Page 10 of 15 ends

shall be built on the same site as the remainder of the project, and evenly distributed throughout the project.
(f) Replacement Units.

1. If a residential development project includes demolition of existing housing units on any property that: (A) includes rental housing units or, if the housing units have been vacated or demolished in the five (5) year period preceding the development application, have been subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to low-or very low-income households; (B) includes existing housing units that is subject to any other form of rent or price control through a public entity’s valid exercise of its police power; or (C) includes housing units that are occupied by low- or very low-income households, the project shall replace those units in compliance with the provisions of Government Code Section 65915(c)(3).

2. In the event that the number of required inclusionary units is less than the number of low income units being eliminated, the developer shall either: (A) include a number of inclusionary units affordable to low income households in an amount equal to the number of low income units being eliminated, or (B) provide the number of inclusionary units required based upon project size (or pay the in-lieu fee if permitted by this Article), and then pay an in-lieu fee for the remaining replacement units (over the inclusionary unit amount) calculated in accordance with Section 10-1.1805(e) for fractional in-lieu fees.
(g) Density Bonus Qualifying Affordable Units. If a developer proposes affordable units to qualify for an increase in density, concessions, incentives, or waivers or reductions of development standards pursuant to State Density Bonus Law (Government Code Section 65915) and Article 17 of this Chapter, those affordable units may also satisfy the inclusionary requirements of this Article, provided they meet the applicable affordability level and other requirements of this Article. (h) Conditions of Approval. Any tentative map, conditional use permit, or site development review approving residential development projects subject to Title 10 shall contain conditions sufficient to ensure compliance with the provisions of this Article. Such conditions shall detail the number of affordable units required, set forth the applicant’s manner of compliance with this Article, and require the execution of an agreement imposing appropriate resale controls and/or rental restrictions on the affordable units.
§ 10-1.1808 Inclusionary Housing Application and Agreement. (a) Agreements Required. Applications for residential development projects shall be approved only concurrently with the approval of an inclusionary housing agreement pursuant to this section. This section shall not apply if the developer chooses to pay a fee in lieu of providing inclusionary units pursuant to Section 10-1.1805.
(b) Information in Application. Applications for residential development projects shall include the following information in addition to information otherwise required under this Code:

1. The location, structure, proposed tenure (rental or ownership) and size of the proposed market rate and inclusionary units;

Page 268 of 647 ends
Page 11 of 15 ends

2. The calculations used to determine the number of required inclusionary units;

3. A floor plan or site plan depicting the location of the inclusionary units;

4. The income level targets for each inclusionary unit;

5. The mechanisms that will be used to ensure that the inclusionary units remain affordable for the required term;

6. For phased developments, a phasing plan;

7. A description of any requested incentives as allowed in subsection (d) of this section;

8. A marketing plan for the process by which qualified households will be reviewed and selected to either purchase or rent affordable units; and

9. Any other information requested by the Community Development Director. (c) Approval. An inclusionary housing agreement between the developer and the Town shall be required by the City Council as a condition of approval of any tentative map, parcel map, conditional use permit, conditional development permit, or site development permit, as applicable.

If the foregoing approvals are not required, an inclusionary housing agreement in a form approved by the Community Development Director shall be executed prior to issuance of a building permit.

The inclusionary housing agreement shall provide for the implementation of the requirements of this article. The inclusionary housing agreement shall be recorded as a restriction on any parcels on which the inclusionary units are proposed to be constructed prior to the issuance of certificates of occupancy or approval of the final inspection for inclusionary units. The agreement shall be effective in perpetuity, unless reduced by the City Council to a specific term to meet the requirements of a financing institution or subsidy program, with respect to each affordable unit.

All inclusionary housing agreements must include, at minimum, the following:

1. Description of the development, including whether the inclusionary units will be rented or owner-occupied;

2. The number, size and location of the inclusionary units, or any approved alternative;

3. Inclusionary incentives by the Town (if any);

4. Provisions and documents for resale restrictions, deeds of trust, rights of first refusal or rental restrictions that shall be recorded against the property, annual report and occupancy requirements, to be executed by the developer;

5. Provisions for monitoring the ongoing affordability of the units, and the process for marketing units, and qualifying prospective residents' households for income eligibility;

6. Deed restriction in a form approved by the City Attorney’s Office;

7. Administrative fee requirements.
(d) Density Bonus Agreement. Where a residential development project complies with Article 17 of this Chapter, the developer shall enter into a combined Inclusionary and Density Bonus Housing Agreement.
§ 10-1.1809 Adjustments and Waiver of Requirements; Incentives. (a) Review and Adjustment to Inclusionary Requirements. The Town shall conduct or commission

Page 269 of 647 ends
Page 12 of 15 ends

a study of market conditions and development economics relevant to the Town’s inclusionary housing requirement consistent with best practices for market study and review approximately every five (5) years. The study may consider, among other factors, changes in land and construction costs, sales prices, rents, financing costs, development activity, and other economic conditions affecting the feasibility of multifamily residential development. The results of the study shall be used to inform the Town’s consideration of future amendments to its inclusionary housing requirements, including the percentage and income levels of required affordable units and the amount and methodology of any applicable in-lieu fees. Nothing in this Section shall limit the Town’s ability to review or amend its inclusionary housing requirements or in-lieu fees more frequently than every five (5) years when warranted by significant changes in market conditions, applicable law, or other circumstances.

If the number of dwelling units is modified after a residential development has been approved by the City Council or Site Development Authority, the inclusionary obligations pursuant to this article shall be recalculated prior to issuance of building permits or recordation of a final map, whichever occurs first.
(b) Waiver of Requirements.

1. The City Council, at its discretion, may waive, wholly or partially, the requirements of this Article and approve alternate methods of compliance with this Article if the applicant demonstrates, and the City Council finds, that such alternate methods meet the purposes of this Article.

2. The requirements of this article may be adjusted or waived if the developer demonstrates that applying this Article would take property in violation of the United States and/or California Constitutions. The developer shall submit a request for an adjustment or waiver together with the application and such additional information as may be required by the Community Development Director to make a determination.

3. The requirements of this article may be adjusted or waived if the developer demonstrates, based on financial reports, studies, pro formas, or other similar documentation, and which has been peer reviewed by the Town, that the requirements of this Article would render the development of a housing development project infeasible. The developer shall submit a request for an adjustment or waiver together with the application and such additional information as may be required by the Community Development Director to make a determination. (c) Incentives. In approving an inclusionary housing agreement, the City Council may, in its sole discretion, include one (1) or more of the following incentives to encourage the construction of inclusionary units:

1. Unit Size Reduction. The size of the inclusionary units may be smaller than the market rate units, consistent with all other provisions herein.

2. Interior Finishes. Inclusionary units may have different interior finishes and features than market rate units so long as the interior features are durable, of good quality and consistent with current State Building Code standards applicable and in effect for Los Altos Hills for new housing.
§ 10-1.1810 Affordable Housing Fund.

Page 270 of 647 ends
Page 13 of 15 ends

(a) An affordable housing fund is hereby established. The housing fund shall be administered by the City Manager or designee, who shall have the authority to govern the housing fund consistent with this Article, and with prescribed procedures for said purpose, subject to approval by the Council. (b) Monies deposited in the housing fund along with any interest earnings on such monies shall be used solely to increase and improve the supply of housing affordable to moderate-, low- and very low-income households. Monies may be used to cover reasonable administrative expenses not reimbursed through processing fees, including reasonable consultant and legal expenses related to the establishment and/or administration of the housing fund and reasonable expenses for administering the process of calculating, collecting, and accounting for inclusionary housing in-lieu fees and any deferred Town fees authorized by this section. No portion of the housing fund may be diverted to other purposes by way of loan or otherwise. (c) Expenditures by the Town Manager from the housing fund shall be by contract and controlled, authorized and paid in accordance with general Town budgetary policies. (d) Investment of monies from the housing fund shall be made in accordance with the Town’s investment policy.
§ 10-1.1811 Administration and Enforcement.
(a) Administrative Procedures. The Town may adopt administrative procedures governing management of the inclusionary program and funds pursuant to this article, including requirements applicable to condominium conversions or similar changes in tenure, provided that such procedures remain consistent with this article and applicable law. (b) Requirements for Certificate of Occupancy/Final Inspection.

1. No temporary or permanent certificate of occupancy shall be issued, final inspection approved or release of utilities authorized for any new dwelling unit in a residential development project until the developer has satisfactorily completed the requirements hereunder, i.e., on-site construction of affordable units, alternative equivalent action(s) or payment of the housing in-lieu fee.

2. No temporary or permanent certificate of occupancy shall be issued, final inspection approved or release of utilities authorized for a dwelling unit described as exempt from the requirements of this article in Section 10-1.1803(c) until the developer has made a showing acceptable to the Town Manager that such an exemption is appropriate. (c) Enforcement. The City Manager or designee shall enforce this Chapter, and its provisions shall be binding on all agents, successors, and assigns of the developer. The City Manager or designee may suspend or revoke any building permit or approval upon finding a violation of any provision of this Article. No land-use approval, building permit, or certificate of occupancy shall be issued for any residential development unless exempt from or in compliance with this Article. The Town may institute any appropriate legal actions or proceedings necessary to ensure compliance herewith, including, but not limited to, actions to revoke, deny, or suspend any permit or development approval.
(d) Excess Rents/Legal Action. If the City Manager or designee determines that rents in excess of

Page 271 of 647 ends
Page 14 of 15 ends

those allowed by operation of this Article have been charged to a tenant residing in an affordable unit, the Town may take appropriate legal action to recover, and the project owner shall be obligated to pay to the tenant, or to the Town in the event the tenant cannot be located, any excess rents charged.
(e) Appeals. Determinations made pursuant to this article may be appealed by the developer pursuant to Title 10, Chapter 1, Article 10 “Appeals.”
§ 10-1.1812 Severability.

If any provision of this article or the application thereof to any person or circumstances is held invalid, the remainder of the article and the application of the provision to other persons not similarly situated or to other circumstances shall not be affected thereby. In the event of any conflict between this article and applicable state law, the state law provision shall prevail.

SECTION III. SEVERABILITY.

If any provision of this Ordinance or the application thereof to any person or circumstance is held invalid or unconstitutional the remainder of this Ordinance, including the application of such part or provision to other persons or circumstances shall not be affected thereby and shall continue in full force and effect. To this end, provisions of this Ordinance are severable. The City Council of the Town of Los Altos Hills hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase hereof irrespective of the fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held unconstitutional, invalid, or unenforceable.

SECTION IV. EFFECTIVE DATE AND PUBLICATION.

Pursuant to the provisions of Government Code Section 36933, a summary of this Ordinance shall be prepared by the City Attorney. At least five (5) days prior to the Council meeting at which this Ordinance is scheduled to be adopted, the City Clerk shall (1) publish the Summary, and (2) post in the City Clerk’s Office a certified copy of this Ordinance. Within fifteen (15) days after the adoption of this Ordinance, the City Clerk shall (1) publish the summary, and (2) post in the City Clerk’s Office a certified copy of the full text of this Ordinance along with the names of those City Council members voting for and against this Ordinance or otherwise voting. This Ordinance shall become effective thirty (30) days from and after its adoption.

Page 272 of 647 ends
Page 15 of 15 ends

INTRODUCED:

PASSED:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

BY:

Mayor
ATTEST:

City Clerk
APPROVED AS TO FORM:

City Attorney

Page 273 of 647 ends

ITEM 7B, Attachment 2
TOWN OF LOS ALTOS HILLS November 5, 2026
Staff Report to the Planning Commission
SUBJECT: Consideration of a Resolution Recommending an Ordinance Adding Article 17 to Chapter 1 (Zoning) of Title 10 (Zoning and Site Development) of the Los Altos Hills Municipal Code to Adopt Inclusionary Housing Regulations Pursuant to Housing Element Program A-6.

TO: Honorable Chair and Commission Members
FROM: Jay Bradford, Community Development Department

RECOMMENDATION:

Review the revised Residential Feasibility Study and Inclusionary Analysis (Attachment 1), proposed Inclusionary Housing Ordinance (Attachment 2), and public-comment materials (Attachments 4 through 6); provide direction on the remaining applicability, affordability, and in-lieu fee policy choices; and adopt a resolution recommending an ordinance to the City Council (Attachment 3), with any modifications directed by the Planning Commission.

BACKGROUND:

Housing Element Program A-6 directs the Town to evaluate the feasibility of an inclusionary housing program and, if determined to be economically feasible, adopt an ordinance establishing affordable housing requirements for qualifying residential development. Strategic Economics prepared the Inclusionary Feasibility Study (Attachment 1) to evaluate the potential effects of requirements on ownership and rental housing projects. The analysis provides the economic basis for establishing an inclusionary program and corresponding in-lieu fees.

The Planning Commission, Finance Committee, and City Council have reviewed the study and policy alternatives through a series of public meetings. The Planning Commission considered the draft ordinance and received comments from CalHDF (Attachment 6) and the League of Women Voters (Attachment 4) in August 2026. The Commission continued the item on August 6 to an August 13 special meeting to allow additional consideration of the comments; however, the August 13 meeting was canceled, and no recommendation was made on those alternatives. The item returns on November 5 with the prior response materials, supplemental economic analysis, and remaining policy choices for the Commission’s consideration.

Prior Public Review
Date Reviewing Body Purpose/Status

Page 274 of 647 ends

April 2, 2026 Planning Commission Initial review of feasibility analysis and potential inclusionary policy alternatives.

April 7, 2026 Finance Committee Review of study findings, financial implications, and implementation options.

April 16,
2026 City Council Policy direction regarding inclusionary requirements, target incomes, and implementation of Program A-6.

June 25,
2026 Planning Commission
Discussion of ordinance framework; supported 15%
requirements for both ownership and rental
developments.

August 6,
2026 Planning Commission Considered the proposed ordinance and public comments; item continued to August 13.

August 13,
2026 Planning Commission Special meeting canceled; continued item was not considered at that meeting.

November 5,
2026 Planning Commission Reconsideration of ordinance policy choices and updated feasibility study material.

DISCUSSION:

Proposed Inclusionary Housing Framework
The proposed Inclusionary Housing Ordinance (Attachment 2) would apply to qualifying new residential developments containing 10 or more dwelling units. Projects would satisfy the inclusionary housing obligation by constructing qualifying affordable units, paying an affordable housing in-lieu fee, or using another alternative permitted by the ordinance. The framework also addresses exemptions, affordable housing agreements, administrative procedures, and the use of revenues in an Affordable Housing Fund.

At its June 25 meeting, the Planning Commission supported a 15 percent requirement for ownership projects (7.5 percent low-income and 7.5 percent moderate-income) and a 15 percent requirement for rental projects (7.5 percent very low-income and 7.5 percent low-income).

Following public comments, staff and Strategic Economics evaluated a more conservative alternative, consisting of 10 percent moderate-income for condominiums and 10 percent for rental projects (5 percent very low-income and 5 percent low-income), while retaining the 15 percent requirement for townhomes.

Policy Alternatives Previously Evaluated
Development
Type June 25 Direction Alternative Evaluated Equivalent Fee Under Alternative Townhomes 15%: 7.5% low / 7.5%
moderate
15%: 7.5% low / 7.5%
moderate $119 per net sq. ft.

Condominiums 15%: 7.5% low / 7.5%
moderate 10% moderate $81 per net sq. ft.

Page 275 of 647 ends

Small-scale
apartments
15%: 7.5% very low /

7.5% low
10%: 5% very low /
5% low $48 per net sq. ft.

Five-story
apartments
15%: 7.5% very low /

7.5% low
10%: 5% very low /
5% low $61 per net sq. ft.

The fees shown above are consultant-calculated equivalents for the identified prototypes, not an adopted Town fee schedule. For comparison, the consultant calculated fees under the June 25 direction of $119 per square foot for townhomes, $131 for condominiums, $73 for small-scale apartments, and $91 for five-story apartments. A separate Council resolution would be needed to establish any final in-lieu fees.

August 2026 Public Comments
Following publication of the August 6 agenda, CalHDF (Attachment 6) and the League of Women Voters (LWV) (Attachment 4) submitted comments regarding the proposed ordinance. Staff, the City Attorney's Office, and Strategic Economics evaluated the issues, and Strategic Economics prepared an updated Feasibility Study to include clarification comments in further support of the study’s conclusions as well additional sensitivity analysis regarding the adjusted affordability scenario from the public comments. The August 13 staff report previously described certain revisions and policy alternatives, but the August 13 meeting was canceled. The discussion below distinguishes changes already proposed in response to comments from policy alternatives requiring Planning Commission direction.

League of Women Voters: Affordability Levels and Financial Feasibility In its comment letter (Attachment 4), the LWV urged the Town to begin with a more conservative inclusionary obligation for development types shown by the study to be more financially sensitive, rather than applying the June 25 direction of 15 percent to every ownership and rental prototype.

The request did not call for abandoning an inclusionary program; it sought to avoid establishing an initial standard that could discourage production of the housing the program is intended to support. Staff referred the alternative to Strategic Economics for additional testing (Attachment 5).

For townhomes, the alternative retains a 15 percent requirement, divided equally between low-income and moderate-income units, because the townhome prototype remained feasible in the study. For condominium projects, the alternative reduces the requirement to 10 percent moderate-income units. Strategic Economics' supplemental analysis of the five-story condominium prototype found that the 10 percent moderate-income scenario crossed the modeled feasibility threshold, whereas the 15 percent scenarios did not. The consultant calculated a corresponding condominium in-lieu fee equivalent of $81 per net residential square foot, compared with $131 per square foot for the 15 percent split-income scenario discussed in June.

For rental projects, the alternative reduces the requirement from 15 percent (7.5 percent very low-income and 7.5 percent low-income) to 10 percent (5 percent very low-income and 5 percent low-income). The corresponding modeled fee equivalents decline from $73 to $48 per net square foot for small-scale apartments and from $91 to $61 per net square foot for five-story apartments.

Neither rental prototype was financially feasible under the assumed market conditions even before

Page 276 of 647 ends

applying an inclusionary requirement; the reduced alternative therefore limits the added obligation but is not represented as making rental development feasible on its own.

The August 13 staff report expressed staff support for the LWV alternative and requested Commission direction on whether to modify the June 25 approach. Because that meeting was canceled, the choice remains open. The final draft of the feasibility study (Attachment 1) also cautions against adopting different standards for townhomes and condominiums solely on the basis of two prototypes. It generally recommends a uniform ownership standard to avoid definitional and administrative difficulties for mixed-product developments. The Commission should therefore weigh the more feasible condominium scenario against the benefits of a consistent ownership requirement.

CalHDF: Relationship to State Density Bonus Law
In its August 5 letter (Attachment 6), CalHDF questioned whether the Town could apply a separate local inclusionary obligation to a project qualifying under State Density Bonus Law (SDBL), and whether additional affordable units could be required as a condition of receiving statutory density bonus benefits. The draft ordinance does not conflict with state Density Bonus Law. As a general reminder, the Town’s authority to adopt an inclusionary ordinance is separately authorized by statute and recognized by case law (Government Code section 65850; Home Builders Assn. v. City of Napa (2001) 90 Cal.App.4th 188; California Building Industry Assn. v. City of San Jose (2015) 61 Cal.4th 435). As proposed, the draft ordinance would not change SDBL eligibility, reduce a statutory bonus, or condition an applicant's entitlement to concessions, incentives, waivers, or other SDBL benefits on meeting additional state-law criteria.

The Town also clarified that qualifying affordable units could receive credit under both programs where the applicable income and affordability standards overlap. A developer would not be required to construct two duplicative sets of affordable units solely because it relies on SDBL while also being subject to the Town's inclusionary requirement. The actual local obligation would depend on the adopted percentage, the base number of units, and the affordability levels and restrictions of the units proposed.

CalHDF: Treatment of Density Bonus Units
CalHDF further cited Attorney General Opinion No. 24-501 and objected to any local requirement that statutory bonus units themselves be affordable (Attachment 6). While the statute is silent on this issue, the draft ordinance remains consistent with the Attorney General opinion and the ordinance’s inclusionary obligations are not imposed on the density bonus units. The draft also recognizes that the affordable units used to earn a statutory density bonus may satisfy some or all of the local inclusionary obligation depending on their affordability.

CalHDF: Development Feasibility and Program Administration CalHDF also asserted that the proposed inclusionary requirements and associated in-lieu fees could further burden projects that the feasibility study already found to be challenged (Attachment 6). It should be noted at the outset that Strategic Economics' Feasibility Study clearly states that infeasibility is not created by an inclusionary program. The consultant found that the rental

Page 277 of 647 ends

prototypes were not feasible largely because of market conditions even without an inclusionary policy; the modeled ownership outcomes differ, with the townhome prototype able to accommodate tested 15 percent scenarios and the five-story condominium prototype more sensitive to the same requirements. However, the Feasibility Study recommended that the Town adopt an inclusionary policy while include monitoring and alternatives review provisions in response to changing economic conditions Those findings support careful calibration and monitoring; they thus do not create burden on development and do not establish that every future development will be feasible or infeasible.

Further, the proposed inclusionary ordinance does not require extremely low-income units. The separate Housing Element Program E-11 addresses local incentives for extremely low-income housing and is not the affordability obligation proposed under Program A-6. In-lieu fee proceeds, when collected, would be reserved for eligible affordable housing purposes; fee payment is an alternative means of compliance rather than a new broad residential impact fee.

The draft ordinance (Attachment 2) also established defined affordability periods of 55 years for rental units and 45 years for ownership units, secured by recorded agreements, instead of an earlier concept of perpetual restrictions. The ordinance contemplated a review of market conditions and development economics approximately every five years, with the ability to revisit the percentage, targeted incomes, and fee schedule sooner if conditions or law warrant. Together with the SDBL clarifications, the affordability periods and review process were proposed to address implementation concerns and preserve flexibility as development conditions change. The proposed Ordinance, therefore, does not create a burden or impede housing development.

Status of Responses and Direction Requested
The proposed Ordinance includes an option for Planning Commission discussion regarding the percentage and affordability level required. The Commission should discuss these two items before making a recommendation on the ordinance to confirm which version would be included.

Additional Considerations in the Revised Feasibility Analysis The additional Strategic Economics memo (Attachment 5) adds several implementation considerations that are material to the ordinance and were not fully reflected in the August staff report:
• Uniform ownership standards. The consultant recommends generally applying uniform inclusionary requirements across ownership product types, recognizing that individual projects may combine townhomes, condominium flats, and other compact ownership formats.

Different requirements for specific product types would require clear definitions and a methodology for mixed-product developments.
• Smaller projects. The consultant recommends considering an exemption or reduced obligation for projects of 10 units or fewer, particularly to preserve feasibility for missing-middle housing and developments under the Starter Home Revitalization Act (SB 684/SB 1123). This differs from the August draft threshold of 10 or more units and requires an explicit policy choice for 10-unit developments.

Page 278 of 647 ends

• Market feasibility. The study recommends adopting other alternative approaches available to proposed developments to achieve feasibility. This can include an in-lieu fee option, ability to construct inclusionary units in offsite locations, and the option to dedicate land in lieu of providing affordable units. The Town should also adopt “relief valve” procedures including Town authority to waive or modify inclusionary housing requirements upon applicant request and demonstration of infeasibility, and a process for Town approval of alternate means of compliance with the inclusionary housing ordinance that will help housing projects to become economically feasible. The proposed Ordinance includes these provisions. • In-lieu fees. The consultant recommends considering one averaged ownership fee derived from its two ownership prototypes and one averaged rental fee derived from its two rental prototypes rather than distinct fees for each building type. It also discusses using fees principally for smaller projects, fractional units, or other specified alternative compliance circumstances when on-site production is preferred.

Planning Commission Policy Direction Requested
Staff requests confirmation of the following issues so that the ordinance and implementing fee resolution can be completed consistently:

1. Applicability threshold. Confirm whether the ordinance will continue to apply to projects containing 10 or more units, or whether 10-unit projects should be exempt or subject to a reduced requirement considering the revised feasibility study. If fully exempting projects of 10 units or fewer, the general applicability threshold would begin at 11 units.

2. Ownership requirements. Determine whether to retain the 15 percent combined low-and moderate-income requirement uniformly for ownership development or pursue a lower uniform percentage. The previously evaluated approach of 15 percent for townhomes and 10 percent moderate-income for condominiums remains an alternative but would require the differentiated treatment to be supported and clearly administered for mixed-product projects.

3. Rental requirements. Confirm whether to retain the June direction of 15 percent (7.5 percent very low-income and 7.5 percent low-income) or adopt the 10 percent alternative (5 percent very low-income and 5 percent low-income). Staff previously supported consideration of the lower requirement based on the feasibility analysis and public comment.

4. In-lieu fee structure and compliance. Confirm whether fees should be averaged within the ownership and rental categories and whether the ordinance should prioritize on-site units with specified in-lieu or other alternative means of compliance. For reference only, averaging the two modeled prototype fees in Attachment 1 yields $125 per net square foot for the 15 percent mixed-income ownership scenario and $54.50 per net square foot for the 10 percent rental scenario. These figures are not proposed final fees; final amounts depend on the adopted policy and subsequent fee resolution.

Page 279 of 647 ends

Other Ordinance Provisions
As discussed above, the previous ordinance revisions responding to CalHDF clarify how local inclusionary requirements interact with State Density Bonus Law, including credit for qualifying affordable units, calculation using base density rather than bonus units, and preservation of statutory density bonus benefits.

The 55-year rental and 45-year ownership affordability terms recorded agreement requirement, and approximately five-year review of program performance were also described in the August 13 staff report.

Following Planning Commission action on the proposed recommendation (draft resolution at Attachment 3), staff will incorporate the direction into the ordinance and prepare the corresponding in-lieu fee resolution and City Council hearing materials.

ENVIRONMENTAL REVIEW:

Consistent with the environmental determination discussed in the August staff report, staff anticipates the ordinance would be exempt from the California Environmental Quality Act pursuant to CEQA Guidelines Section 15061(b)(3), because it establishes a regulatory framework and does not approve a specific development project or authorize a physical change to the environment. The finding will be included in the final ordinance materials for review.

FISCAL IMPACT:

There is no immediate fiscal impact associated with this Planning Commission item. If adopted, the ordinance would authorize an inclusionary housing program under which qualifying developments would provide affordable units or satisfy an authorized alternative compliance option. Any in-lieu fee revenues collected pursuant to a subsequently adopted fee resolution would be deposited in the Town’s Affordable Housing Fund and used for eligible affordable housing purposes. Implementation would entail administrative review and monitoring, with actual program costs dependent on the volume and type of future applications.

ATTACHMENTS:

1. Strategic Economics Inclusionary Feasibility Study Final Draft (October 30, 2026)

2. Draft Inclusionary Housing Ordinance

3. Draft Planning Commission Resolution

4. League of Women Voters Letter (August 6, 2026)

5. Strategic Economics Additional Analysis Memo (October 30, 2026)

6. CalHDF Letter (August 5, 2026)

Page 280 of 647 ends

Residential Feasibility Study and
Inclusionary Analysis

FINAL DRAFT REPORT
Prepared for:

Town of Los Altos Hills
October 30, 2026
ITEM 7B, Attachment 3

Page 281 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 2 Table of Contents
TABLE OF FIGURES ...............................................................................................................................4 INTRODUCTION ..............................................................................................................................6 Report Purpose.....................................................................................................................................6 Background on Inclusionary Housing Policies....................................................................................6 Report Organization .............................................................................................................................9 FINANCIAL FEASIBILITY ANALYSIS.............................................................................................10 Methodology ...................................................................................................................................... 10 Analysis Approach ..................................................................................................................... 10 Prototypes.................................................................................................................................. 11 Pro Forma Assumptions............................................................................................................ 13 Initial Feasibility Analysis Results..................................................................................................... 18 Trends Influencing Feasibility ................................................................................................... 18 Feasibility Findings.................................................................................................................... 20 Policy and Market Scenarios............................................................................................................ 23 Inclusionary Policy Scenarios ................................................................................................... 24 Market Scenarios ...................................................................................................................... 26 In-Lieu Fee Analysis................................................................................................................... 29 POLICY CONSIDERATIONS AND FINDINGS.................................................................................32 Inclusionary Policies in Neighboring Jurisdictions .......................................................................... 32 Other Policy Considerations.............................................................................................................. 33 Applicability of the Policy .......................................................................................................... 33 HCD Review ............................................................................................................................... 35 MTC Transit Oriented Communities Requirements................................................................. 35 State Density Bonus Law.......................................................................................................... 36 Summary of Findings and Conclusions............................................................................................ 37 Findings...................................................................................................................................... 37 Conclusions ............................................................................................................................... 37 APPENDIX I: FINANCIAL FEASIBILITY ASSUMPTIONS.......................................................................40 Cost Assumptions...................................................................................................................... 40

Page 282 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 3 Prototype and Revenue Assumptions...................................................................................... 42 APPENDIX II: EXAMPLE POLICY OUTCOMES AND CONSIDERATIONS FOR IMPLEMENTATION......46 Policy Outcomes Assuming No State Density Bonus .............................................................. 46 Policy Outcomes with the State Density Bonus Law............................................................... 50

Page 283 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 4 Table of Figures
Figure 1: Income Limits for Santa Clara County in 2025, by Category and Household Size .................7 Figure 2: Components of Financial Feasibility: Project Value and Project Cost Components ................8 Figure 3: Potential Impact of Inclusionary Policies on Financial Feasibility.............................................8 Figure 4: Residential Prototypes Used in Inclusionary Analysis for Los Altos Hills............................... 12 Figure 5: Summary of Cost Assumptions for Ownership Housing Pro Forma....................................... 14 Figure 6: Summary of Cost Assumptions for Rental Pro Forma............................................................. 15 Figure 7: Ownership Pro Forma Market Rate Unit Revenue Assumptions............................................ 16 Figure 8: Rental Pro Forma Market Rate Revenue Assumptions .......................................................... 16 Figure 9: Maximum AMI for Income Categories vs. "Achieved AMI" Assumption for Ownership and Rental Inclusionary Units.......................................................................................................................... 17 Figure 10: Maximum Sales Price for Below Market Rate Units by Income Level and Prototype, 2025 ................................................................................................................................................................... 18 Figure 11: Market Rate Rent in Los Altos Hills vs. Achieved Monthly Rent per Unit at Required Income Level, 2025 ............................................................................................................................................... 18 Figure 12: Santa Clara County Trends in Home Values, Construction Costs, and Multifamily Rents, 2020 to 2025 ........................................................................................................................................... 19 Figure 13: Monthly Santa Clara County Home Value Index vs. National Weekly 30-Year Mortgage Rate............................................................................................................................................................ 19 Figure 14: General Market Trends in Santa Clara County for 4- and 5-Star Rental Properties, Cap Rate vs. Value per Unit ............................................................................................................................. 20 Figure 15: Pro Forma Results per Unit for Ownership Housing in Los Altos Hills................................. 21 Figure 16: Residual Land Value vs. Land Costs per Unit for Ownership Housing in Los Altos Hills without Inclusionary Policy ....................................................................................................................... 22 Figure 17: Pro Forma Results per Unit for Rental Housing in Los Altos Hills........................................ 23 Figure 18: Residual Land Value vs. Land Costs per Unit for Rental Housing in Los Altos Hills........... 23 Figure 19: Residual Land Value per Unit vs. Land Costs per Unit in Los Altos Hills with a 15 Percent Inclusionary Requirement, by Income required – Ownership Units ...................................................... 25 Figure 20: Residual Land Value per Unit vs. Land Costs per Unit in Los Altos Hills by Inclusionary Scenario – Rental Units............................................................................................................................ 26 Figure 21: Sensitivity of Residual Land Value to Market Price in Los Altos Hills – Townhomes ......... 27 Figure 22: Sensitivity of Residual Land Value to Market Price in Los Altos Hills – 5-Story Condos.... 27

Page 284 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 5 Figure 23: Residual Land Value vs. Land Costs per Unit for Small Scale Rental Apartments Los Altos Hills, with Current Market Conditions vs. Range of Likely Market Outcomes....................................... 28 Figure 24: Residual Land Value vs. Land Costs per Unit for 5-Story Rental Apartments in Los Altos Hills, with Current Market Conditions vs. Range of Possible Market Outcomes .................................. 29 Figure 25: Equivalent In-Lieu Fee per Net Square Foot Corresponding to Revenue Foregone from Inclusionary Policy in Los Altos Hills, by Scenario – Ownership Units ................................................... 30 Figure 26: Equivalent In-Lieu Fee per Net Square Foot Corresponding to Revenue Foregone from Inclusionary Policy in Los Altos Hills, by Scenario – Rental Units.......................................................... 31 Figure 27: Inclusionary Requirements in Santa Clara County Jurisdictions, as of 2025..................... 33 Figure 28: Detailed Cost Assumptions for Ownership Prototypes in Los Altos Hills............................. 40 Figure 29: Detailed Cost Assumptions for Rental Prototypes in Los Altos Hills.................................... 41 Figure 30: Los Altos Hills Municipal Fee Estimates - Ownership and Rental Prototypes..................... 42 Figure 31: Market Rate Ownership Pro Forma Revenue Assumptions, Lost Altos Hills....................... 42 Figure 32: Market Rate Rent per Unit Assumptions, Los Altos Hills...................................................... 43 Figure 33: Area Median Income and Income Limits for Santa Clara County, 2025............................. 43 Figure 34: Maximum Sales Price per Unit and Average BMR Price for Townhome Prototype in Santa Clara County, by BMR Income Level, 2025............................................................................................. 44 Figure 35: Maximum Sales Price per Unit and Average BMR Price for 5-Story Condos in Santa Clara County, by Income Level, 2025................................................................................................................ 44 Figure 36: Below Market Rate Rental Revenue Assumptions in Santa Clara County, 2025............... 45 Figure 37: Example Policy Outcomes by Scenario for Ownership ......................................................... 48 Figure 38: Example Policy Outcomes by Scenario for Rental ................................................................ 49 Figure 39: Density Bonus Amount Triggered by Provision of Affordable Units, By Income Level and Share of Units in Income Category........................................................................................................... 50 Figure 40: Example Policy Outcomes Assuming Utilization of the State Density Bonus Law by Scenario for Ownership ............................................................................................................................ 51 Figure 41: Example Policy Outcomes Assuming Utilization of the State Density Bonus Law by Scenario for Rental ................................................................................................................................... 52

Page 285 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 6 Introduction

REPORT PURPOSE
This report is part of a collaborative effort by six jurisdictions in Santa Clara County to analyze and potentially implement new or revised affordable housing policy tools. The participants in the study include Gilroy, Los Altos Hills, Los Gatos, Mountain View, the City of Santa Clara, and Sunnyvale.

Together, these jurisdictions have commissioned Strategic Economics to perform a Grand Nexus Study. The study includes the required analysis and recommendations for:
• Residential impact fees charged on single-family units and “missing middle” developments of fewer than 10 units
• Inclusionary affordable housing requirements and associated in-lieu fees • Commercial linkage fees charged on non-residential development The Grand Nexus Study culminated in three reports to address each of the above policies: The Residential Impact Fee Study; The Residential Feasibility Study and Inclusionary Analysis (this report); and The Commercial Linkage Fee Study. Each jurisdiction has opted into one, two, or all three components of the study.

This report focuses on inclusionary housing policies in the Town of Los Altos Hills. Los Altos Hills does not currently have an inclusionary policy. The report describes how inclusionary policies work, how policy alternatives could impact the financial feasibility of new housing development, and how Los Altos Hills could leverage a possible inclusionary housing policy to increase affordable housing production within the town. The purpose of this report is to provide context and findings for the Town to review when considering a possible inclusionary housing policy.

BACKGROUND ON INCLUSIONARY HOUSING POLICIES
Inclusionary housing policies—also called “inclusionary zoning”—require market rate housing developers to set aside a percentage of units in a residential project and offer them at below market rates as deed-restricted affordable units. California law requires rental inclusionary policies to provide for alternative means of compliance with the policy, such as by paying a fee “in-lieu” of providing on-site units or by supporting the production of affordable units in some other way (such as a land donation). Inclusionary policies capture some of the economic value generated by building market rate housing in order to subsidize the development of affordable units. Inclusionary policies are one strategy local governments can use to create mixed income developments, provided the policy is met with onsite units.

Typically, inclusionary policies designate certain income requirements that developers must meet to fulfill the affordability requirement. These income categories are based on the area median income (AMI) of a region. Rents and sales prices are set at below market rate (BMR) levels so that households pay no more than 30 percent of the targeted income level for their income category. Each year, the California Department of Housing and Community Development (HCD) publishes income limits and standard housing income categories for every county corresponding to its AMI. Figure 1 shows the income limits for Santa Clara County in 2025.

Page 286 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 7 FIGURE 1: INCOME LIMITS FOR SANTA CLARA COUNTY IN 2025, BY CATEGORY AND HOUSEHOLD SIZE Extremely
Low
Very Low Low Median Moderate
Percent of AMI: 30% 50% 80% 100% 120%
Household Size
1 $42,200 $70,350 $111,700 $136,650 $164,000
2 $48,200 $80,400 $127,650 $156,150 $187,400
3 $54,250 $90,450 $143,600 $175,700 $210,850
4 $60,250 $100,450 $159,550 $195,200 $234,250
5 $65,100 $108,500 $172,350 $210,800 $253,000
Source: CA HCD, 2025; Strategic Economics, 2025.

INCLUSIONARY POLICIES AND FINANCIAL FEASIBILITY
Because inclusionary policies seek to leverage the activities of the private market to produce affordable housing, they are reliant on the financial feasibility of market rate housing projects. Market rate development projects are only financially feasible when the market value of the project (based on total revenue) exceeds project costs and an investment return required by capital markets. As shown in Figure 2, financial feasibility is determined by the following factors:
• Total market value is determined by the revenues generated by the project. o For ownership projects, the market value consists of the sales prices the units can obtain.
o For rental projects, the market value of the project depends on the annual revenue it will generate and the current capitalization rate, which reflects overall project investment risk relative to alternative investments.
• Total project costs include hard costs, soft costs, investment return, and land costs. o Hard costs include materials and labor associated with physical construction of the building.
o Soft costs include indirect expenses such as architecture and engineering, taxes, insurance, financing costs, and municipal fees.
o Land costs refer to the price the developer pays to acquire the land. • Investment return refers to the required financial return on investment that a project must achieve to attract developer and lender investment. For ownership projects, required return is based on the net revenues from the initial sale of units. For rental projects, required return is based on the stabilized annual operating income of the development.

Page 287 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 8 FIGURE 2: COMPONENTS OF FINANCIAL FEASIBILITY: PROJECT VALUE AND PROJECT COST COMPONENTS Source: Strategic Economics, 2025.

Inclusionary policies have the benefit of potentially producing affordable housing units without using public forms of subsidy, but they may impact financial feasibility by reducing the market value of the project. Because inclusionary units generate less revenue than market rate units, substituting market rate units with inclusionary units will reduce the project’s total revenue. Figure 3 visualizes this impact on the project’s overall feasibility. In this example, a new project that may be feasible with all market rate units becomes infeasible if its total value is significantly reduced when a percentage of the units are offered at below market rates. However, projects that generate an investment return that is sufficiently high to absorb a reduction in value from the inclusionary policy, while still meeting a minimum market return, will remain financially feasible.

FIGURE 3: POTENTIAL IMPACT OF INCLUSIONARY POLICIES ON FINANCIAL FEASIBILITY Source: Strategic Economics, 2025.

An effective inclusionary policy will set affordability requirements high enough that they result in substantial additional affordable units, but not so high that they prevent the feasibility of market rate housing projects altogether. Thus, the purpose of conducting a feasibility analysis is to identify an inclusionary level that that allows projects to generate enough revenue to proceed while also providing affordable units.

Land Costs
Hard Costs
Soft Costs
Market Value
Investment
Return
Land Costs
Hard Costs
Soft Costs
Market Value
Market Value
Investment
Return
All Market Rate Units Market Rate + BMR
Units
Development Costs

Page 288 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 9 Financial feasibility in market rate housing projects depends upon a variety of highly dynamic factors.

Project costs can fluctuate due to changes in construction labor, materials costs, interest rates, or a variety of other factors. Similarly, a project’s revenue can fluctuate significantly based on the availability of housing supply in the local market, changes in the attractiveness of a project’s location, or other factors impacting demand in the local market. Finally, the minimum investment return can fluctuate based on external factors such as interest rates in the macro economy or trends in real estate capital markets. The Policy and Market Scenarios discussion in the next section includes an analysis of market scenarios that address these fluctuations. Additionally, updating feasibility analyses periodically can help ensure that inclusionary policies are still able to function optimally as market conditions change.

REPORT ORGANIZATION
This report summarizes the impact of potential inclusionary policies on financial feasibility for housing projects and provides context for consideration of policy options. The remainder of this report is organized in two sections:
• Section II, Financial Feasibility Analysis, describes the current market for housing development in Los Altos Hills; the potential for market rate projects to support inclusionary housing; and the sensitivity of financial feasibility to market conditions. This section also discusses the relationship between inclusionary requirements and in-lieu fee levels. • Section III, Policy Considerations and Findings section discusses inclusionary housing policies used by Los Altos Hills’ neighboring jurisdictions and other state and local policy considerations influencing the implementation of inclusionary policies. The Summary of Findings and Conclusions portion of this section summarizes the final conclusions from all prior sections for consideration by the Town of Los Altos Hills.

The report also includes two appendices:
• Appendix I: Financial Feasibility Assumptions
• Appendix II: Example Policy Outcomes and Considerations for Implementation

Page 289 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 10 Financial Feasibility Analysis
Strategic Economics conducted a financial feasibility analysis to test the viability of housing products under current market conditions and test a set of inclusionary policy scenarios under a range of market conditions. This analysis evaluated both ownership and rental housing project types. The results provide context that the Town of Los Altos Hills can use to assess and potentially modify its inclusionary policy to align with the Town’s affordable housing objectives in an evolving market.

This financial feasibility analysis section includes four parts. It begins with an overview of the methodology used for the feasibility analysis, including details on the modeling approach and the types of housing tested in the analysis. This section then shows the results of the financial feasibility modeling for all housing types in Los Altos Hills—both with the existing inclusionary policy and under a variety of market and inclusionary policy scenarios. The financial feasibility analysis concludes with an overview of in-lieu fees, explaining how they are calculated and how inclusionary requirements impact in-lieu fee levels.

METHODOLOGY
Analysis Approach
Strategic Economics evaluated financial feasibility for housing projects in Los Altos Hills using a static “pro forma” model. A pro forma is a real estate finance model used to aggregate assumptions about development costs, revenue, and financing conditions to evaluate the financial feasibility of new housing projects. A static pro forma—a simplified version of pro forma that does not model developer cash flows over time—is a standard approach for supporting broadly applicable policy and planning decisions.

Applying this pro forma model to residential projects and inclusionary policies in the Los Altos Hills required three steps:
• Develop a set of residential development “prototypes” to evaluate inclusionary policies for multi-unit development across a range of product types typical of recent housing construction in Santa Clara County;
• Develop pro forma assumptions for these prototypes, including hard construction costs, soft costs, and revenue expectations for Los Altos Hills. Strategic Economics based these assumptions on market research, interviews with developers active in Santa Clara County, and other recent experience with pro forma analysis in the San Francisco Bay Area. • Use the pro forma model to test the financial performance of each prototype under a variety of market and policy scenarios.

EVALUATING FEASIBILITY
Strategic Economics measured the financial performance of each prototype using residual land value analysis. In residual land value analysis, the land cost estimate is initially taken out of the equation.

Instead, the analysis begins by estimating project market value, hard costs, and soft costs, as well as a minimum acceptable return for a typical developer pursuing the project.

This calculation requires identifying six key metrics for feasibility:

Page 290 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 11 • Project Revenue is the primary indicator of market value for the project, based on expected income or sales proceeds.
o For ownership projects, this is the project’s total net sales proceeds. o For rental projects, this is the project’s annual net operating income (NOI), which is defined as the annual revenue from rent, less vacancy and operating costs. • Target Return is the level of return on investment that a project must achieve for the developer and lenders to determine that it is a worthwhile investment. o For ownership projects, this metric used is return on cost. Return on cost is the ratio of net project value to total development cost.
o For rental projects, the primary metric is yield on cost. Yield on cost is the ratio of NOI to total development cost.1
• Supportable Development Costs are the highest development cost for which the project would still be viable given project revenue and the minimum target return. o For ownership products, the supportable development cost is each project’s projected net sales proceeds, less the required return on cost.
o For rental projects, the supportable development cost is the project’s projected NOI divided by its minimum target yield on cost.
• Total Development Costs (Excluding Land) are the sum of hard construction costs, soft costs, municipal fees, financing costs, and contingency.
• Residual Land Value (RLV) is calculated by subtracting total development cost (excluding land) from supportable development cost. The residual land value that remains, therefore, represents the maximum a developer could pay for land while still achieving the minimum necessary return.
• Residual land value can be compared to Typical Land Costs to evaluate feasibility. Typical land costs are the market average costs (calculated on a per square foot basis) for a vacant property on which the housing project could be built.

A project is financially infeasible when its residual land value is less than zero. If its residual land value is greater than zero but less than the typical market value for land, the project may be feasible because land values tend to vary significantly within a market depending on a range of factors. If the residual land value is at or greater than a typical land value, it is likely to be feasible.

Prototypes
The development prototypes used in the feasibility analysis are generalized examples of new housing, representing a broad range of multi-unit housing projects typical of recent development trends in northern Santa Clara County. This study used four residential prototypes to evaluate financial feasibility. The set of prototypes in the inclusionary study overlaps with the set in the residential impact fee study, which considered small scale multi-unit as well as build-to-suit single-family homes.

The prototypes used in the Los Altos Hills’ inclusionary analysis range in density from 20 to 73 units per acre, and from three to eight stories in height. Figure 4 provides a summary of each of the five 1 For a development project to obtain financing, its yield on cost must be higher than its capitalization rate—the ratio of NOI to project value.

In other words, lenders and developers expect the completed project to be worth more than its total development costs. The relationship between yield on cost and cap rates varies based on financing conditions and perceived market risk.

Page 291 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 12 prototypes. This includes two ownership product types and three rental product types, as described below:

Ownership Prototypes
• Townhomes: this prototype represents a development with attached, single-family units built at a density of 20 units per acre. These units generally include between two and four-bedrooms, averaging 1,710 square feet, and are built over a private garage. • 5-Story Condos: this prototype includes four stories of for-sale flats, built at a density of 52 units per acre, over one story of podium parking and one story of parking underground. Units in this building would range from one-bedroom to four-bedrooms, for an average unit size of 1,382 square feet. This prototype includes two parking spaces per unit.

Rental Prototypes
• Small Scale Rental Apartments: this prototype is a three-story multifamily building at a density of 36 units per acre. The prototype contains a mix of studio to three-bedroom units, with an average unit size of 955 square feet. Parking is a combination of surface and tuck-under parking with two spaces per unit.
• 5-Story Rental Apartments: this prototype is a similar building type to the 5-story Condo prototype, but with smaller units and a higher residential density of 73 units per acre. This prototype includes a mix of units from studios to three-bedrooms, with an average unit size of 891 square feet. This prototype includes 1.75 parking spaces per unit.

FIGURE 4: RESIDENTIAL PROTOTYPES USED IN INCLUSIONARY ANALYSIS FOR LOS ALTOS HILLS Townhomes 5-Story
Condos
Small Scale
Rental
Apartments
5-Story Rental
Apartments
Tenure Ownership Ownership Rental Rental
Parcel Size (acres) 1.5 1.8 1.5 1.8
Number of Stories 3 5 3 5
Total Gross Square Feet 50,850 148,000 60,647 133,059
Retail Square Feet 0 0 0 0
Number of Units 30 90 54 128
Average Unit Size (square
feet) 1,710 1,382 955 891
Bedroom Types 2-BD to 4-BD 1-BD to 4-BD Studio to 3-
BD Studio to 3-BD
Units per Acre 20 51 36 73
Parking Format Private
Garages
Underground
+ Podium
Surface +
Tuck-Under
Underground
+ Podium
Residential Parking Ratio 2.00 2.00 2.00 1.75
Residential Parking
Spaces 60 180 108 224
Retail Parking Spaces 0 0 0 0
Source: Strategic Economics, 2025; Cities in Santa Clara County, 2025; CoStar, 2025.

Page 292 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 13 Pro Forma Assumptions

COST AND RETURN ASSUMPTIONS
Strategic Economics estimated development costs based on interviews with developers and general contractors experienced with residential development in Santa Clara County, as well as reviews of market data and budgets for other development projects throughout the Bay Area. As noted earlier, the main cost categories for development include hard costs, soft costs, and land costs:
• Hard costs refer to the direct construction costs, such as materials and construction labor, used to physically prepare the site for development, construct the building, and perform all site work including site circulation, utilities, and landscaping. • Soft costs include all indirect expenses required to complete a development project, such as architecture, engineering, consulting, legal fees, taxes, municipal fees, and insurance. In addition to these costs, developers must account for the cost of financing a construction loan, and a contingency for unexpected expenses.
• Land costs refer to the cost of acquiring land for development. In residual land value analysis, the land cost is calculated last, as the highest land cost the developer could afford to pay and still have the project pencil. Strategic Economics also estimated “typical land costs” for each prototype to compare against the residual land value and assess feasibility. Because higher density, compact housing types such as townhomes, condominiums, and rental apartments remain untested by the market in Los Altos hills, the “typical” cost of land for the studied prototypes is more uncertain than in other markets where recent land sales for similar developments can be observed. Strategic Economics estimated land costs in Los Altos Hills by inferring from more general patterns in land values in Santa Clara County and from typical industry standard ranges in land costs as a percentage of overall project value.

Strategic Economics modeled the required investment return as follows:
• For ownership projects, required return is based on the net revenues from the initial sale of units (referred to as return on cost).
• For rental projects, required return is based on the stabilized annual operating income of the development (referred to as yield on cost).

The Townhome and Condo prototypes assume similar wood frame construction methods for the residential portions of their buildings, but the Condo prototype also includes significant added costs of above- and below-ground parking, mechanical, and utility systems. These differences translate to a higher cost of construction of $400 per residential square foot. Figure 5 provides a high-level overview of cost assumptions used to evaluate financial feasibility for ownership product types. The condo prototype also has higher construction financing costs due to its longer construction time. More detailed cost assumptions for these prototypes can be found in the Appendix, in Figure 28.

Page 293 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 14 FIGURE 5: SUMMARY OF COST ASSUMPTIONS FOR OWNERSHIP HOUSING PRO FORMA Unit of measure Townhomes 5-Story Condos
Land Costs per square foot $125 $125
Hard Costs
Demolition and Site Work per sq. ft. land $40 $40
Building Area Construction per gross sq. ft. $275 $400
Parking
Private Garages
N/A –
Included in
building area
Structured/Podium per space $50,000
Underground per space $80,000
Soft Costs
Arch, Eng., Consulting, Taxes, Insurance,
Legal, and Other Soft Costs
(excluding fees, contingency)
% of hard costs 18.0% 18.0%
Municipal Fees per unit $106,385 $100,404
Contingency % of hard + soft costs 5.0% 5.0%
Financing Costs % of hard + soft costs 4.2% 6.2%
Developer Return
Target Developer Return-on-cost % of total dev costs 15.0% 15.0% Sources: Strategic Economics, 2025; Developer Interviews, 2025; Redfin, 2025; CoStar, 2025; Federal Reserve Bank of New York, 2025.

Rental prototypes have similar differences in construction costs related to their number of stories, parking format, and inclusion of retail components. Figure 6 summarizes development costs for each of the two rental prototypes. The 5-Story Apartments cost slightly more to build than the Small Scale Apartments because of differences in height and parking format. Further, projects with smaller average unit sizes cost more to build on a square foot basis because they require a higher density of appliances, plumbing, and electrical systems. The five-story rental prototype typically also requires longer construction periods—leading to larger financing costs than those assumed for the Small Scale Apartments. Lastly, the assumption for typical land value for each prototype was based on its locational value and zoned development capacity. Further details on cost assumptions are shown in the Appendix, in Figure 29.

Page 294 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 15 FIGURE 6: SUMMARY OF COST ASSUMPTIONS FOR RENTAL PRO FORMA Unit of measure
Small Scale Rental
Apartments
5-Story Rental
Apartments
Land Costs
Land Costs per square foot $125 $125
Hard Costs
Demolition and Site Work per sq. ft. land $40 $40
Building Area Construction
Residential - Type V per gross sq. ft. $290 $310
Parking
Surface per space $10,000
Structured/Podium per space $50,000
Underground per space $80,000
Tuck-under per space $10,000
Soft Costs
Arch, Eng., Consulting, Taxes, Insurance, Legal,
and Other Soft Costs
(excluding fees, contingency)
% of hard costs 13.0% 13.0%
Municipal Fees per unit $75,783 $75,559
Contingency % of hard + soft costs 5.0% 5.0%
Financing
Total Financing Cost % of hard + soft costs 5.4% 6.2%
Developer Share
Developer Overhead Fee % of hard + soft costs 3.0% 3.0% Target Developer Yield-on-Cost % of total dev costs 5.5% 5.5% Sources: Strategic Economics, 2025; Developer Interviews, 2025; Redfin, 2025; CoStar, 2025; Federal Reserve Bank of New York, 2025.

MARKET RATE REVENUE ASSUMPTIONS
Because there are currently no compact rental or ownership developments in Los Altos Hills, there was little directly comparable market data on which to base market rents and sales price assumptions for these product types. In developing these assumptions, Strategic Economics reviewed similar developments in other parts of Santa Clara County, but actual rents and sales values in Los Altos Hills have yet to be tested by the market. The sensitivity of the feasibility results to market conditions is discussed in more detail in the next section.

Strategic Economics analyzed recent property sales data from Redfin and CoStar alongside current property listings and input from local developers to determine market rate revenue assumptions for ownership products. Because there are no examples of recent townhome or condo sales within Los Altos Hills, Strategic Economics examined townhome and condo sales prices in nearby jurisdictions and single-family home sales in Los Altos Hills to estimate sales prices for these product types within the town.

Ownership revenue assumptions are shown in Figure 7. Strategic Economics assumed that typical townhome sales prices in Los Altos Hills would range from $1.7 million for a two-bedroom unit to $2.0 million for a four-bedroom unit. Typical condo prices in Los Altos Hills were assumed to range from $1.2 million for a one-bedroom unit to $2.1 million for a four-bedroom unit. Detailed revenue assumptions for ownership projects can be found in the Appendix in Figure 31.

Page 295 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 16 FIGURE 7: OWNERSHIP PRO FORMA MARKET RATE UNIT REVENUE ASSUMPTIONS Unit of measure Townhomes 5-Story Condos
Average Sales Value per unit $1,880,833 $1,698,901
Marketing Expense % of Sales Price 5% 5%
Net Revenue $1,786,792 $1,613,956
Sources: Strategic Economics, 2025; Developer Interviews, 2025; Redfin, 2025.

Market rate rent assumptions were derived from three sources of information. Strategic Economics analyzed current rental listings in comparable apartment projects; collected input from developers; and analyzed market trends from CoStar to identify typical rents in the area surrounding Los Altos Hills for similar rental types. Figure 8 provides a summary of revenue assumptions for each prototype, including the average monthly rent and assumptions for vacancy rate, operating costs, and capitalization rate. Capitalization rate (cap rate) refers to the ratio of net annual operating income (gross maximum rent, less vacancy and operating costs) to the project’s total market value. Strategic Economics assumed that all rental prototypes have the same vacancy, operating expense ratio, and cap rate, but average monthly rent for each prototype differs according to unit size and building format.

The units in the 5-Story Apartments are smaller than those in the Small Scale Apartments but can likely command higher rents per square foot, leading to higher average monthly rents per unit. Detailed revenue assumptions for rental projects can be found in the Appendix in Figure 32.

FIGURE 8: RENTAL PRO FORMA MARKET RATE REVENUE ASSUMPTIONS Unit of measure
Small Scale
Rental
Apartments
5-Story Rental
Apartments
Rent Assumptions
Average Unit Size Square feet 955 891
Monthly Rent per Square Foot $/sq. ft. $4.61 $4.81
Average Monthly Rent per unit $4,019 $4,310

Other Revenue Assumptions
Vacancy Rate % of Units 5% 5%
Operating Expense
% of Market Rate
Revenue 30% 30%
Capitalization Rate 4.50% 4.50%
Sources: Strategic Economics, 2025; Developer Interviews, 2025; Apartment Websites, 2025; CoStar, 2025.

BELOW MARKET RATE REVENUE ASSUMPTIONS
Strategic Economics also modeled the below market rate (BMR) rents and sales prices associated with inclusionary units as appropriate to each inclusionary policy scenario. These units were priced at a level such that qualifying households pay no more than 30 percent of their monthly income on housing costs. To determine whether households qualify for affordable housing, HCD publishes a table for each county that lists the county’s “area median income” and household income categories based on household size. This income table (shown in the Appendix in Figure 33) delineates the maximum income that qualifies as very low-, low-, and moderate-income for each household size. The inclusionary policy designates what share of units must be provided to households in each income

Page 296 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 17 range. The maximum revenue each inclusionary unit could generate is tied to the top of this range, although in practice this amount is somewhat lower than the maximum.

Expected revenues were calculated using the income limits, the assumed share of income that can be spent on housing and estimates for other monthly costs. For ownership housing, other monthly costs might include utility costs, property taxes and insurance, private mortgage insurance, and homeowners’ association (HOA) fees. For rental housing, this generally includes any utility costs not included in the rent. Because household incomes vary for households qualifying in each income category, Strategic Economics assumed that the average AMI level of qualifying households would be below the maximum allowable AMI in the income category. Figure 9 shows the assumed percentage of AMI used as an average in each income category for ownership and rental inclusionary units.

FIGURE 9: MAXIMUM AMI FOR INCOME CATEGORIES VS. "ACHIEVED AMI" ASSUMPTION FOR OWNERSHIP AND RENTAL

INCLUSIONARY UNITS
Income Category
Maximum
% of AMI
Assumed % of
AMI for
Ownership
Units
Assumed % of
AMI for Rental
Units
Moderate-Income 120% 110% 110%
Median-Income 100% 90% 90%
Low-Income 80% 70% 60%
Very Low-Income 50% N/A 50%
Sources: Strategic Economics, 2025.

Note: Achieved AMI reflects the likelihood that not all households qualifying in an income category could afford a rent or sales price based on the maximum income level within an income category. The percentages used correspond with California Health and Safety Code guidance on affordable rent and sales price levels for Very Low, Low, and Moderate-Income categories.

Though market rate rents and sales prices exceed affordable rents and prices for most income categories, market rate rents are likely to be affordable to moderate-income households. Figure 10 shows achieved sales prices for BMR units as modeled in the ownership pro forma models. For most income categories and prototypes, BMR units would achieve less than one-sixth of the market rate sales price in Los Altos Hills. Figure 11 shows achieved monthly rents for BMR units compared to market rate rents. For rental prototypes, BMR units could theoretically achieve rents that are close to market rate levels for Median-Income units, and that exceed market rate rents for Moderate-Income units. However, when modeling feasibility for inclusionary policies, Strategic Economics assumed that BMR rents would be no less than the achieved rents shown in Figure 11 and no more than the market rate rent for each unit type. Figure 34 and Figure 35 in the Appendix show more details on affordable sales prices and rent calculations.

Page 297 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 18 FIGURE 10: MAXIMUM SALES PRICE FOR BELOW MARKET RATE UNITS BY INCOME LEVEL AND PROTOTYPE, 2025 Townhomes 5-Story Condos
Average Market Rate Price per Unit $1,880,833 $1,698,901

Below Market Sales Price per Unit (Income Level)
Low (70% Achieved AMI) $299,260 $285,259
Median (90% Achieved AMI) $426,448 $403,744
Moderate (110% Achieved AMI) $586,061 $522,229
Sources: Strategic Economics, 2025; Santa Clara County Housing Authority, 2025; CA HCD, 2025; Redfin, 2025; Freddie Mac, 2025; Alta Housing, 2025; Ownwell, 2025.

Notes: Accounts for share of income spent on housing costs (30%), current interest rates, monthly utility costs, taxes, insurance, and HOA costs. Achieved sales price reflects likely average for units in each income category in an inclusionary project.

FIGURE 11: MARKET RATE RENT IN LOS ALTOS HILLS VS. ACHIEVED MONTHLY RENT PER UNIT AT REQUIRED INCOME LEVEL, 2025
Small Scale Rental
Apartments
5-Story Rental
Apartments
Average Market Rate Rent per Unit $4,019 $4,310
Below Market Monthly Rent per Unit (Income Level)
50% AMI (Very Low) $2,018 $1,997
60% AMI (Low) $2,371 $2,346
90% AMI (Median) $3,616 $3,576
110% AMI (Moderate) – based on calculation $4,445 $4,395 110% AMI (Moderate) Used in Model – based on market rate rent $4,019 $4,310 Sources: Strategic Economics, 2025; Santa Clara County Housing Authority, 2025; CA HCD, 2025.

Note: This table shows achieved monthly rent at each income level based on 30 percent of monthly income at the specified share of AMI, less a utility allowance. Because the calculated rents for 110% AMI households exceed market rate rents, market rate rents were used in the model to estimate project revenue for projects requiring moderate-income units.

INITIAL FEASIBILITY ANALYSIS RESULTS
The current feasibility outlook in Los Altos Hills is a product of both the strength of the town’s housing market and recent trends on a regional or national level that are influencing construction costs and housing demand. This section provides an overview of recent regional trends before presenting findings on ownership and rental project feasibility in Los Altos Hills.

Trends Influencing Feasibility
Home values in Santa Clara County largely kept pace with construction cost inflation over the past five years, while multifamily rent growth fell behind costs. The years 2022 and 2023 were a period of high rates of inflation throughout the national economy. As shown in Figure 12, construction costs across California rose by approximately 46 percent between 2020 and 2025. Home values in Santa Clara County increased by nearly as much (40 percent) over the same period. In comparison, Santa Clara County’s multifamily rents grew by only 27 percent over the five-year period—far less than the construction cost increases developers have experienced in the multifamily construction industry.

Page 298 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 19 FIGURE 12: SANTA CLARA COUNTY TRENDS IN HOME VALUES, CONSTRUCTION COSTS, AND MULTIFAMILY RENTS, 2020 TO 2025
Sources: CoStar, 2025; CA EDD, 2025; ENR, 2025; Zillow, 2025; Strategic Economics, 2025.

Note: This chart shows the Zillow Home Value Index for Santa Clara County on an annual average basis, but doing so simplifies the monthly fluctuations in home value. For this reason, the trend shown here does not entirely match the trend shown in Figure 13, despite being based on the same data.

Santa Clara County home values increased rapidly from 2020 through mid-2022, but higher interest rates limited home value growth from late 2022 through 2025. Figure 13 shows monthly changes in the same home index for Santa Clara County shown Figure 12, and compares them to weekly fluctuations in the national 30-year mortgage rate over the past five years. This chart shows that mortgage interest rates doubled nationally, from 3.7 percent to 7.8 percent, between 2020 and 2023 and remained above 6.5 percent through mid-2025. Rising interest rates nationally moderated rising home prices in Santa Clara County, which grew by less than one percent between July of 2022 and July of 2025.

FIGURE 13: MONTHLY SANTA CLARA COUNTY HOME VALUE INDEX VS. NATIONAL WEEKLY 30-YEAR MORTGAGE RATE Sources: Freddie Mac, 2025; Zillow, 2025; Strategic Economics, 2025.

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%
2020 2021 2022 2023 2024 2025
Cumulative % Growth Since
2020
California Construction Costs
Santa Clara County Annual
Home Value Index
Santa Clara County Annual
Multifamily Rents
-40%
-20%
0%
20%
40%
60%
80%
100%
120%
Cumulative % Change Since
Beginning of 2020
Weekly Freddie Mac 30-YR
Mortgage Rate
Monthly Zillow Home Value Index,
Santa Clara County

Page 299 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 20 The value per unit of multifamily properties in Santa Clara County decreased between 2021 and 2025.

As shown in Figure 14, the average market value of four and five-star multifamily properties in Santa Clara County fell from a high of $750,000 per unit in 2021 to $570,000 in 2024, with a modest recovery for 2025 to date. Capitalization rates (which describe the ratio between a property’s annual income and its market value) increased in 2023, indicating a decline in investor confidence in multifamily investments. This decline was in response to higher interest rates at the national level and a softening of the rental market in Santa Clara County and many other parts of the San Francisco Bay Area.

FIGURE 14: GENERAL MARKET TRENDS IN SANTA CLARA COUNTY FOR 4- AND 5-STAR RENTAL PROPERTIES, CAP RATE VS. VALUE PER UNIT
Sources: CoStar, 2025; Strategic Economics, 2025.

As a result of these recent market trends, multifamily rental projects are much less financially feasible in 2025 than they were in 2020, and ownership projects are slightly less feasible than they were in 2020. Multifamily rental project developers face much higher construction costs in 2025 than they did in 2020, with lower average market values per unit; this makes it much more difficult to develop a viable project in 2025. Ownership projects also face higher interest rates and higher construction costs in 2025 than they did in 2020. However, the market values for ownership units in Santa Clara County have mostly kept pace with construction costs over the past five years.

Feasibility Findings
The feasibility analysis results presented in this section reflect the market trends identified above. This section begins with an explanation of feasibility findings for ownership prototypes, followed by the feasibility results for rental prototypes.

FEASIBILITY OF OWNERSHIP PROTOTYPES
Both ownership prototypes are currently feasible in Los Altos Hills. Figure 15 shows the results of the pro forma analysis for both prototypes before considering any inclusionary policy scenario. Figure 16 compares the residual land value per unit for each ownership prototype with Strategic Economics’ best estimate for market land values for these prototypes in Los Altos Hills. The Townhome prototype would generate a residual land value of approximately $720,000 per unit with no inclusionary requirement.

Although the lack of market data for high density development in Los Altos Hills creates relative $650,000
$750,000
$700,000
$570,000 $570,000 $610,000

3.6% 3.4% 3.7%

4.5% 4.5% 4.4%
2020 2021 2022 2023 2024 2025
Value per Unit
Cap Rate

Page 300 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 21 uncertainty in this result, the residual land value exceeds the typical range of market land values in other parts of Santa Clara County. The 5-Story Condo prototype would generate a residual land value of approximately $225,000 per unit, which also exceeds the estimate for typical land costs for condo projects. Unlike the Townhome prototype, the residual land value for the 5-Story Condo prototype is more in the typical range of land costs in other parts of the County, suggesting that the performance of this product is not as strong.

FIGURE 15: PRO FORMA RESULTS PER UNIT FOR OWNERSHIP HOUSING IN LOS ALTOS HILLS Townhomes 5-Story Condos
Revenue per Unit
Gross Revenue (Average) $1,880,833 $1,698,901
Less Marketing -$94,042 -$84,945
Total Sales Proceeds $1,786,792 $1,613,956

Development Costs per Unit
Hard Costs $557,370 $812,629
Soft Costs (Excluding Fees) $100,327 $146,273
Other Municipal Fees $106,385 $100,404
Financing & Contingency $69,779 $119,693
Total Development Cost $833,860 $1,178,999

Residual Land Value per Unit
Total Sales Proceeds $1,786,792 $1,613,956
Target Return on Cost 15% 15%
Supportable Development Cost $1,553,732 $1,403,440
Total Development Cost $833,860 $1,178,999
Residual Land Value $719,872 $224,441

Feasibility (per unit)
Residual Land Value $719,872 $224,441
Typical Land Cost $272,250 $104,712
Typical Land Cost per S.F. $125 $125
Feasibility Result
Feasible: RLV exceeds land
cost
Feasible: RLV exceeds land
cost
Sources: Strategic Economics, 2025; Town of Los Altos Hills, 2025; Developer Interviews, 2025; Redfin, 2025.

Page 301 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 22 FIGURE 16: RESIDUAL LAND VALUE VS. LAND COSTS PER UNIT FOR OWNERSHIP HOUSING IN LOS ALTOS HILLS WITHOUT

INCLUSIONARY POLICY
Sources: Strategic Economics, 2025; Developer Interviews, 2025; Redfin, 2025.

FEASIBILITY OF RENTAL PROTOTYPES
Strategic Economics found that neither of the two rental prototypes are feasible in Los Altos Hills under current market conditions. Figure 17 provides a summary of pro forma results for each prototype and Figure 18 visualizes the feasibility result. As Figure 17 shows, neither of the rental project types currently support a positive residual land value---indicating that neither rental prototype could afford to pay for land and remain feasible in Los Altos Hills. Of course, both costs and revenue projections can change as market conditions change; because development costs grew nearly 20 percent more than multifamily rents over the past five years (as shown in Figure 12) while cap rates increased (as shown in Figure 14), a multifamily project that was viable in Santa Clara County in 2020 would be challenging to develop in 2025.
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
Townhomes 5-Story Condos
Residual Land Value per Unit
Residual Land Value - All Market Rate Units Typical Land Cost per Unit

Page 302 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 23 FIGURE 17: PRO FORMA RESULTS PER UNIT FOR RENTAL HOUSING IN LOS ALTOS HILLS Small Scale Rental
Apartments
5-Story Rental
Apartments
Net Operating Income per Unit $31,344 $33,620

Development Costs per Unit
Hard Costs $394,097 $459,824
Soft Costs (Excluding Fees) $51,233 $59,777
Other Municipal Fees $75,783 $75,559
Financing, Contingency & Developer Overhead $60,830 $75,376 Total Development Cost $581,942 $670,536

Residual Land Value per Unit
Total Net Operating Income $31,344 $33,620
Target Yield on Cost 5.5% 5.5%
Supportable Development Cost $569,899 $611,270
Total Development Cost $581,942 $670,536
Residual Land Value -$12,043 -$59,266

Feasibility (per Unit)
Residual Land Value -$12,043 -$59,266
Typical Land Costs per Unit $151,250 $74,443
Typical Land Costs per S.F. $125 $125
Feasibility Result
Infeasible; RLV is
negative
Infeasible: RLV is
negative
Sources: Strategic Economics, 2025; Town of Los Altos Hills, 2025; Developer Interviews, 2025; CoStar, 2025.

FIGURE 18: RESIDUAL LAND VALUE VS. LAND COSTS PER UNIT FOR RENTAL HOUSING IN LOS ALTOS HILLS Sources: Strategic Economics, 2025; Town of Los Altos Hills, 2025; Developer Interviews, 2025; CoStar, 2025.

Note: Current Policy requires 15 percent of units to be affordable, with an average income level of 100 percent of AMI. Because achieved rents are unlikely to equal the maximum allowable rent, this policy was tested assuming the project could achieve 90 percent AMI rents.

POLICY AND MARKET SCENARIOS
The previous section describes feasibility under current conditions in Los Altos Hills; this section considers alternative policies that may better align with the Town’s objectives and optimize the production of affordable units in future years. In addition, Strategic Economics recommends that local governments considering a new or updated affordable housing policy anticipate the potential impact ($100,000)
($50,000)
$0
$50,000
$100,000
$150,000
$200,000
$250,000
Small Scale Rental Apartments 5-Story Rental Apartments Residual Land Value
Typical Land Cost per Unit

Page 303 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 24 of the policy under a range of market conditions, as it is difficult for local inclusionary ordinances to keep current with evolving market cycles.

Strategic Economics performed scenario testing to evaluate how the prototypes would perform with different inclusionary requirements and market conditions. Strategic Economics also calculated an equivalent in-lieu fee associated with each scenario. The purpose of this section is to help Los Altos Hills select inclusionary and in-lieu fee requirements that could remain relevant as market conditions change.

Inclusionary Policy Scenarios
This section describes the impact of an inclusionary policy on financial feasibility. Inclusionary policies consist of two main components: the percentage of onsite affordable units required, and the income group(s) targeted by the policy. The scenarios presented below assume an onsite inclusionary requirement of between ten and 15 percent, while testing the sensitivity of the results to different income levels. The findings and conclusions section includes a discussion of setting the percentage onsite requirement and the targeted income levels.

Strategic Economics tested the following inclusionary policy scenarios:
• Ownership:
o Scenario A: 15 Percent (all Moderate-Income)
o Scenario B: 15 Percent (all Low-Income)
o Scenario C: 15 Percent (7.5 Percent Low-Income and 7.5 Percent Moderate-Income) • Rental:
o Scenario A: 10 Percent (5 Percent Very Low-Income and 5 Percent Low-Income) o Scenario B: 15 Percent (7.5 Percent Very Low-Income and 7.5 Percent Low-Income) o Scenario C: 10 Percent (5 Percent Extremely Low-Income and 5 Percent Very Low-Income)
o Scenario D: 12 Percent (4 Percent Extremely Low-Income, 4 Percent Very Low-Income, and 4 Percent Low-Income)

SCENARIO RESULTS
The tested policy scenarios for ownership housing are financially feasible for the Townhome prototype but marginally infeasible for the 5-Story Condo prototype. Figure 19 shows the residual land value per unit for both ownership prototypes with a 15 percent moderate-income requirement (Scenario A); 15 percent low-income requirement (Scenario B); and 15 percent requirement with a mix of both incomes (Scenario C). As discussed in the methodology section (Figure 10), there is a significant gap between new market rate home values and the below market sales prices for moderate- and low-income buyers.

As a result, each policy scenario substantially reduces project revenues for both the Townhome and Condo prototypes; this is reflected in the drop in residual land values for each policy scenario compared to the result with no inclusionary requirement. However, for the Townhome prototype, each scenario still yields more than $500,000 per unit in residual land value, which is likely sufficient to

Page 304 of 647 ends

Residential Feasibility and Inclusionary Analysis for the Town of Los Altos Hills 25 pay for land for such a project in Los Altos Hills. By contrast, the residual land value for the 5-Story Condo prototype drops below $100,000 per unit in each scenario—the estimated typical market price of land for that prototype. However, the policy scenarios may still be feasible for condominium developments if the actual land price is lower. Although townhomes are the higher-performing product type, condominium flats may still be built as part of a development project that contains a mix of product types including both horizontally attached and stacked units that may be delivered in a different building type than the 5-Story Condo prototype, which includes a parking podium at significant additional cost.

FIGURE 19: RESIDUAL LAND VALUE PER UNIT VS. LAND COSTS PER UNIT IN LOS ALTOS HILLS WITH A 15 PERCENT INCLUSIONARY REQUIREMENT, BY INCOME REQUIRED – OWNERSHIP UNITS Sources: Strategic Economics, 2025; Town of Los Altos Hills, 2025; Developer Interviews, 2025; Redfin, 2025.

Note: Scenario A refers to a 15 percent moderate-income requirement (tested at 110% AMI). Scenario B refers to a 15 percent low-income requirement (tested at 70% AMI). Scenario C refers to a 15 percent requirement split between low-income and moderate-income.

Because the rental prototypes are infeasible under current market conditions even without an inclusionary policy, the tested inclusionary policies are unlikely to be operative until market conditions improve. Figure 20 summarizes this result. This figure illustrates that—under current conditions—rental prototypes would generate approximately $38,000 to $66,000 less residual land value per unit under the tested scenarios compared to a scenario with no requirement. However, these differences would likely change as market rate rents, development costs, and area median income change over time.

The next subsection includes findings on how changes in market conditions might support an inclusionary policy.
$555,415 $523,894 $542,436
$719,872
$78,636 $49,273 $66,587
$224,441
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
Scenario A
Scenario B
Scenario C
No Requirement
Scenario A
Scenario B
Scenario C
No Requirement
Townhomes 5-Story Condos
Residual Land Value per Unit
Residual Land Value per Unit Typical Land Costs per Unit

Page 305 of 647 ends
← All documents from this meeting