Exhibit A:
SB1 Proposed Project List for FY 26-27
Project Title Description Location Est. Start Est.
Complete
Est. Min
Useful Life
Est. Max
Useful Life
Traffic Signals
Maintenance FY 26-27
Continued maintenance of
traffic signals citywide
including signal repairs,
purchase of traffic signal
equipment and other related
maintenance.
48 locations along Imperial
Highway, Atlantic Avenue,
Alameda Street, Santa Fe
Avenue, State Street, Long
Beach Boulevard, Bullis
Road, and Martin Luther
King Jr. Boulevard.
September
2026
June
2027
1 year 5 years
Complete Street –
Atlantic Ave FY 26-27
Construct 21,750-ft Class IV
cycle track, 29 curb
extensions, 29 ADA-ramps;
widen 4,330-ft sidewalks;
reduce 1 lane; install 60
crosswalks, conflict striping,
lighting, 68 push buttons, 16
toucan crossings, LPI, and
12 wayfinding signs.
Atlantic Avenue from Abbot
Road to McMillian Street.
September
2026
June
2027
10 years 20 years
Annual Street
Improvement –
Santa Fe Ave FY 26-
27 Construction of new ADA
compliant curb ramps where
needed as well as Street
Improvement, r ehabilitate,
gutters, sidewalks, driveway
approaches, signages and
pavement for City streets
that need repairs.
Santa Fe Ave from Norton
Ave to Fernwood Ave and
N Santa Fe Ave from
Cedar Ave to Euclid Ave.
September
2026
June
2027
10 years 20 years
200
AGENDA STAFF REPORT
DATE:
August
4, 2026
TO:
Honorable Mayor and Members of the City Council
APPROVED BY:
Suja Lowenthal, City Manager
PREPARED BY:
Nam Tran, PE, QSP/QSD, Associate Engineer
SUBJECT:
AWARD OF CONTRACT TO USA CONSTRUCTION LLC. FOR THE
LYNWOOD NATATORIUM POOL RESURFACING PROJECT (CIP
PROJECT NO. 4011.68.113)
Agenda Item # 10.6.
Recommendation:
Staff recommends that the City Council adopt the attached resolution:
1 .
Awarding a contract to USA Construction, Inc. for the Lynwood Natatorium Pool Resurfacing Pool Resurfacing Project (CIP Project No. 4011.68.113); 2 .
Authorize the Mayor to execute the agreement; and
3 .
Authorize the City Manager to approve agreement amendments related to the project.
Executive Summary:
The Lynwood Natatorium Pool Resurfacing Project was originally bid and awarded based on specifications utilizing pool paint as the finished surface. Following contract award, the City was informed that pool paint is no longer permitted for public swimming pools under the current requirements of the Los Angeles County Department of Public Health. As a result, the original construction contract was terminated, the project specifications were revised to require white pool plaster and tile finishes, and the project was rebid.
On March 24, 2026, City Council authorized staff to advertise a notice inviting rebid under
revised specifications calling for white pool plaster and tile finishes, consistent with current County requirements.
On May 28, 2026, the bid opening for the Lynwood Natatorium Pool Resurfacing Project was City Council City Council Special Meeting 201
held, and staff determined that USA Construction LLC. was the lowest responsible and responsive bidder.
Staff recommends that the City Council award the construction contract to USA Construction, Inc. in the amount of $386,170. The total estimated project cost, including contingency, construction management and inspection, labor compliance, and project management, is $502,021, which is within the approved project budget. No additional appropriation is required. (PW) Background:
The Lynwood Natatorium is one of the City's premier recreational facilities, serving residents of all ages through swim lessons, aquatic fitness programs, and community swimming—including as the home pool for the Lynwood Merlin swim team. The City has undertaken a comprehensive renovation and repair effort at the Natatorium under a total approved project budget of $5,000,000. To date, $1,549,360 has been expended on emergency repairs and facility improvements, including installation of a chain-link fence, emergency repairs to panoramic windows and broken doors, expansion joint repairs, electrical work, gas and sewer line relocation, plumbing repairs, and preliminary pool-related work. The remaining balance as of the end of March 2026 is $3,450,640, designated for continued improvements including pool resurfacing, pool equipment replacement, room and office remodeling, and exterior painting.
The pool resurfacing component addresses surface cracks, staining, and general wear that have accumulated over time. Completing this work is essential to reopening the pool to the public and restoring full aquatic programming at the facility.
Original Bid and Contract Award
In November 2025, staff contacted the Los Angeles County Department of Public Health to confirm the applicable resurfacing requirements for the Natatorium pool. Based on a phone consultation at that time, staff was advised that because the pool had previously been painted, repainting with the same material would meet current requirements. Relying on that guidance, the City proceeded with the eBid process with specifications for pool paint resurfacing.
On January 20, 2026, the City Council awarded the construction contract to National Pools, Inc. in the amount of $229,500, and a pre-construction meeting was held on January 26, 2026.
Change in County Requirements and Contract Termination
At the pre -construction meeting, the contractor informed staff that pool paint is no longer an approved finish under the Los Angeles County Department of Public Health's current standards. Subsequent confirmation with the County verified that only white pool plaster or tile finishes are now acceptable for public pools, as pool paint can chip once the pool is filled, creating health hazards for swimmers.
The contractor submitted a change order of $254,600 to substitute the paint specification with white plaster and ceramic tile. This amount exceeds the original contract value of $229,500. On February 5, 2026, the City Manager notified the City Council of this development and the anticipated impact on the project timeline via a written update.
Staff consulted with the CIP Ad Hoc Committee and the City Attorney to evaluate the appropriate path forward. Both the City Attorney and staff concluded that approving the change order was not appropriate.
The substitution of pool paint with plaster and tile represents a material change in project scope, not a routine modification, and approving it would confer an unfair competitive advantage on the current City Council City Council Special Meeting 202
contractor, whose original bid was based on paint specifications. Other qualified contractors could reasonably assert that they would have submitted different or more competitive bids had the project originally been specified with plaster and tile.
Furthermore, the City Attorney determined that the original contract could not legally proceed, as the paint specifications upon which it was based are no longer permissible under County requirements. On March 10, 2026, the City formally terminated the Construction Contract Agreement with National Pools, Inc., citing the inability of enforcing the original contract under current County public pool plan approval requirements. The City remains responsible for payment of any work reasonably completed by National Pools, Inc. prior to termination, which is approximately $3,800.
On March 12, 2026, the City Manager issued a second written update to the City Council explaining the basis for the termination decision and confirming that staff would bring a formal rebid authorization item to the March 24 Council meeting.
Updated Project Scope
Staff has prepared revised specifications in full compliance with current Los Angeles County Department of Public Health requirements. The updated scope of work includes, but is not limited to:
Coordination with the Los Angeles County Department of Public Health to ensure compliance with all applicable health and safety requirements Removal of the existing interior pool coating through sandblasting
Replacement of damaged or deteriorated pool tiles
Application of a new white pool plaster and tile finish Preparation, repair, and plastering of the pool overflow gutter All work shall be performed in accordance with applicable industry standards, safety regulations, and the City's quality expectations to ensure the long-term durability and safety of the facility.
Past Council Actions
Meeting Date
Description
November 18, 2025
City Council approved the project specifications, and authorized the advertisement of the Notice Inviting Bids (NIB) for the Lynwood Natatorium pool resurfacing project (CIP Project No. 4011.68.113).
January 20, 2026
City Council awarded a contract to National Pools, Inc. for the Lynwood Natatorium pool resurfacing project (CIP Project No. 4011.68.113).
January 26, 2026
During Pre-con Meeting, Contractor brought up the Change Order for plaster and tiles with updated specs.
February 5, 2026
Staff presented this Change Order to the Ad Hoc Committee Meeting to inform the Committee about it due to the Updated Specs and the proposed change order amount is more than 100% of the original contract.
February 5, 2026
Staff reached out to the City Attorney for his recommendation on how to proceed with the change order or rebid this Pool Resurfacing Project.
February 13, 2026
City Attorney advised that City should re-bid the project as paint and plaster are not functionally equivalent, and this substitution would likely be considered a material change, making re-bidding the most legally defensible option.
City Council City Council Special Meeting 203
March 10, 2026
City decided to send out letter for project termination due to the change order, which would have required changing the original scope of work, and decided to bring it back to Council meeting for rebid.
March 24, 2026
City Council approved the project specifications and authorized the advertisement of the notice inviting rebid for the Lynwood Natatorium Pool Resurfacing Project (CIP Project No. 4011.68.113).
Discussion and Analysis:
On March 25, 2026, the notice inviting rebids was advertised on the City’s website (PlanetBids) for the Project. The bid opening took place on the PlanetBids Platform on Tuesday, May 28, 2026, at 10:00 A.M.
The following two bids were received:
Bidder
Bid
1. USA Construction LLC
$386,170
2. Ultimate Pool Remodeling, Inc.
$596,240
Contractor’s Bid Items:
Item Description
Quantity
Unit
Unit Price
Cost
Mobilization/Demobilization
1 LS
$15,000
$15,000
Health Department Drawings and Permit
1 LS
$2,500
$2,500
Remove Existing Pool Paint Finish by
Sandblasting. Clean and Prepare for Pool
Plaster
11,000
LS
$4.55
$50,000
Water Leakage Testing for the Pool
1 LS
$5,000
$5,000
Install New White Pool Plaster
11,000
SF
$24.05
$264,580
Install 1" x 1" Unglazed Ceramic Mosaic Tiles
for (7) Lane Lines with T-Mark on Both Ends
7,235
SF
$2.94
$21,240
Install 1" x 1" Non-Glazed Ceramic Mosaic
Tiles for (14) Cross Wall Targets
80 SF
$40.31
$3,225
Install 4" x 4" Non-Slip Ceramic Mosaic Tiles
for (2) 4'-6" Depth Band Lines
475
SF
$7.84
$3,725
Prepare and Clean Overflow Gutter and
Install New White Pool Plaster at Overflow
Gutter
430
LF
$38.33
$16,480
Replace any Damaged or Missing Return
Covers
10 EA
$142.00
$1,420
City Council City Council Special Meeting 204
Replace any Damaged or Missing 6" x 3"
Waterline Tiles and 3" x 3" Cap Tiles
40 EA
$30.00
$1,200
Fix the Grabrails around the Pool
3 EA
$600.00
$1,800
TOTAL AMOUNT BASE BID IN FIGURE
$386,170
Staff reviewed the bids received, including verification of contractor licensing through the Contractors State License Board (CSLB), registration with the Department of Industrial Relations (DIR), bidder qualifications, references, and responsiveness to the project specifications.
Based on this evaluation, staff determined USA Construction LLC. to be the lowest responsible and responsive bidder and meets all qualifications necessary to successfully complete the project.
It is estimated that the project will take 30 calendar days to complete the work set forth in the bid. Staff will circulate the contract documents, set up a pre-construction meeting, and schedule the work to commence.
Project Budget:
The table below shows the total estimated construction cost:
Description
Amount
Construction Cost
$386,170
Contingency (10%)
$38,617
Construction Management & Inspection (10%)
$38,617
Labor Compliance and other related cost (5%)
$19,308.50
Project Management (5%)
$19,308.50
Total Estimated Construction Cost
$502,021
The Lynwood Natatorium Pool Resurfacing Project is a part of the Lynwood Natatorium Renovation Project for where the approved budget includes $3,659,000 of the following funds for this project: 2019 Lease Revenue Bonds—$ 2,297,968, Specified Capita Grant— $1,361,032. The sub-allocation for each phase of the Lynwood Natatorium Pool Renovation Project are as follows:
Pool Resurfacing Project
Pool Equipment Design Project for Pool Boilers, Filters, Pumps, etc.
Remodel of Natatorium Lobby and Locker Rooms, Bathrooms Project Natatorium Exterior Painting Project
Temporary Chain-link Fence
Fiscal Impact:
City Council City Council Special Meeting 205
3. USA Construction LLC - Bid (Copy).pdf
Resolution - Award_Pool_Resurfacing_Rebid.docx
The Natatorium Renovation and Emergency Project 113 is included in the FY 2025–26 Adopted Budget. Of the $3,659,000 adopted amount, an estimated $208,360 has already been spent, leaving an estimated amount of $3,450,640 available for the completion of this project. The table below shows the funding sources approved for this project.
Funding Source
Amount
(3533) Specified Capita Grant
$1,361,032
(9055) 2019 Lease Revenue Bond
$2,297,968
Total
$3,659,000
Coordinated With:
City Manager’s Office
Finance and Administration Services Department
ATTACHMENTS:
Description
City Council City Council Special Meeting 206
Company’s QualificationsFor
Lynwood Natatorium Pool
Resurfacing Project
USA Construction
1595 Peachtree Pkwy, Suite204-344
Cumming, GA 30041
Local Office
1976 S. La Cienega Blvd, Suite 277
Los Angeles, CA 90034
P|877-248-1872
F|877-224-0872
Solicitation Number: #4011.68.113
Date Due: 05/28/2026
207
Table of Contents
Cover Sheet 1
Table of Contents 2
USA Construction 3
Meet the Team 4-8
Team Structure 9
Sample Projects 10-19
Project Management 20-29 Partners *not all are listed 30-37 2 208
History: USA Construction was founded in 2001 by a group of aquatic professionals that branched off of USA Pools. Since 2001 we have built various types of commercial aquatic facilities. Our group began in the southeast, then worked its way up the east coast, by 2014 we expended to the southwest and west coast.
Safety: The USA Construction group has experience working on projects from coast to coast. Our safety record is impeccable with zero incidents. Our safety and standards are unmatched in our industry.
Methodology: USA Construction utilizes the traditional project management “waterfall” method for project management. As well as the utilization of daily reporting that with smart phone technology allows us to have real time trends on project completion.
Capabilities: USA Construction has worked on new build- design as well as renovations for the following types of facilities: traditional commercial swimming pools, lazy rivers, waterslides, beach entry pools, natatoriums, and splash parks as they have become more and more popular. USA conducts business with private business such has hotel/resorts, municipalities, and federal military installations. No job is too big or too small for our group.
Past Performance: USA Construction has the ability to work with smaller scale commercial projects as well as large scale projects. We complete more than 200 projects under $100,000 each year, 50-100 projects that are $100,000-$500,000 and 2-10 projects that scale over $1,000,000.00. These projects each of their own specific needs and requirement in which we work with a multitude of engineers, architects, sub contractors and material vendors.
USA Construction
3 209
Meet Your Team
Our Team at USA Construction is made up of multiple subject matter experts. These professionals are paired with each project depending on the project scope. We have provided swimming pool construction, management, and maintenance services for cities, counties, country clubs, and military bases throughout the country. We have in place the valued services and programs that will enable us to serve you with a 100% guaranteed satisfaction.
We will accept no less than the highest standards in materials and workmanship and offer our full commitment to making this process as smooth and worry-free as possible. We stay personally involved step by step in your project, which ensures complete control over the work and seamless integration with all facets of the job, guaranteeing a top-notch final product and total customer satisfaction. Again, we appreciate you taking a good look at USA Construction.
Alison Abbott
Sales Manager
Project
Manager
Superintendent
Onsite Staff
Morris Barkley
Office
Administration
Carmen
Zamudio
Contracts and
Finance
4 210
Alison Abbott
Alison studied international business. After working in the medical and hospitality fields she joined the USA team in 2014 and has been successful in moving into a senior management role where her skills and knowledge in technology have aided in bringing organizational systems into more efficient practices.
Experience
• Organizational and talent
management
• Multidepartment management
• Revenue management of 60-80
Million annually
• Fields of experience: Hospitality,
Medical, Construction, Aquatic
Safety
• Organizational training and system
set up
Skills
• Ability to connect teams
• Ability to provide clear
communication to high level and
ground level team members
• Ability to communicate
expectations and assist others in
setting goals to meet expectations
• Ability to problem solve and make
decisions.
• Ability to identify root cause and
work towards solution
5 211
Team Structure
Its important to have a system of checks and balances on site and in the office. Your project will go through a system of checks and site walks before anything is every approved or labeled as complete.
Client
General
Manager
Project
Manager
Onsite
Super
Sometimes simple is better!
We believe that there should be a
clear chain of command and that
begins with YOU, the client. You
will always have access to all three
levels of management throughout
your project.
The admin or sales manager acts as
the construction director. They
listens, estimates, and designs.
Without their stamp of approval
you will not be presented with pay
applications or statements of work
completed.
Your project manager for USA will
function 75% in the office and 25%
on-site. They are the eyes and ears
for the project and holds the
superintendent to the highest
standard.
Your onsite superintendent will be
with our crew daily overseeing
each step of your project. We have
several gifted supers that are part
of our company.
6 212
Sample Projects
7 213
Design-Build
Orange Park - GA
1305 Oakland Dr. SW Atlanta, GA 30310
Valued at $1,450,000
Building – 4400sf
Pool – 6000 sf
8 214
Design-Build
John A. White Park - GA
1183 Cascade Cir SW Atlanta, GA 30311
Valued at $1,675,000
Building – 7545sf
Pool – 4707 sf
9 215
Design-Build
Browns Mill Aquatic - GA
4929 Browns Mill Rd Lithonia, GA 30038
Valued at $2,600,000
Building – 7450sf
Pool – 17,000 sf
10 216
Renovations
Need an update to your location?
Add a slide* Resurface* Extend your Pool * Convert a pool to splash pad* Add play features
11 217
Splash Park Design/Build
Riverside Park - GA
575 Riverside Road Roswell, GA 30075
Valued at $594,500
Splash Pad – 2200 sf
12 218
Splash Park Design/Build
Riverside Park - GA
9000 Fouts Road Roswell, GA 30075
Valued at $623,250
Splash Pad – 2550 sf
13 219
Splash Pads
You dream it and we build it!
The more out there the design, the more fun the build! At USA Construction we like our partners to have big ideas. Spirals, dinosaurs, and pirates oh my! The sky can be the limit with USA.
14 220
Splash Parks
Imagine the possibilities
15 221
Project Management
Our Project Management Software has multiple interfaces, of which the main dashboard/health chart give us a quick snapshot of how each project is doing.
It allows you to easily identify those projects which are progressing fine and those projects which are in trouble.
Time: Time shows what percentage your project is behind schedule.
Tasks: Shows how many tasks still need to be completed.
Workload: shows how many tasks are overdue.
Progress: Shows what percentage of your project is complete.
Cost: Shows your costs vs your planned budget.
16 222
Project Management
17 SAMPLE
223
USA Design/Build Steps
1) Team Selection :
After carefully reading through the scope of work, USA
Construction chooses your team based on experience/skill set, quality of work, and cost. Putting together a strong team that can function independently as well as a single unit creates a strong foundation to support the following steps and project. 2) Pre-Construction
This tends to be a shorter phase within our design build process, but it absolutely critical to our success. This is the step where we will ask a great number of questions to make sure that everyone is on the same page. Expectations and reality do not always line up when designing a project and its important to get a solid picture of what is to be
expected/delivered. Here is where goals, complete scheduling, budgeting (and budgeting problems) and potential project challenges will be addressed. This is also where value
management/engineering will first appear.
3) Architectural Design
Design can begin after budget and timeline have been set.
There will be assessments for potential cost savings and ways to increase productivity and preliminary drawings are
presented to the project owner.
4) Construction
This can begin during the design phase as it is common to have timing overlap between the two depending on the project. USA tries to minimize change orders through utilizing S-curves and an agile waterfall project management techniques, but this is the phase where change orders will appear (if any).
5) Post Construction
Once completed, your team will do an overview of the project, a final site walk and various training depending on the technology utilized for your facility.
18 224
Scheduling
USA Construction, LLC Project Start Date 3/12/2019
Schedule to date 1/29/2020
START
DATE END DATE TASKS
3/21/19 3/27/20 Project Management 366 80%
3/21/19 3/27/20 Project Supervisor 366 80%
3/21/19 3/27/20 Bond 366 100%
3/21/19 3/27/20 Insurance 366 100%
3/21/19 3/22/20 Trailer 361 100%
3/21/19 3/22/20 Temporary Toilet 361 100%
3/21/19 4/5/19 Mobilization 14 100%
3/21/19 3/22/20 Dumpster 361 100%
3/21/19 3/22/20 Office Supplies 361 100%
3/21/19 2/14/20 Temporary Fence 323 100%
3/21/19 8/29/19 Survey Staking 158 100%
3/21/19 10/28/19 Miscellaneous Materials 217 100%
3/21/19 3/22/20 Travel 361 75%
3/23/20 3/27/20 Final Cleaning 4 0%
3/25/19 3/28/19 Site Prep/Tree Protection 3 100%
3/25/19 1/24/20 Earthwork 299 90%
2/24/20 2/29/20 Paving 10 0%
5/2/19 8/15/19 Excavation, Trenching, Backfilling 103 100% 5/9/19 5/15/19 Termite Control 6 100%
3/5/20 3/12/20 Pavement Marking 7 0%
11/4/19 12/30/19 Polyvinyl Chloride Pipe Storm Drain 56 69% 3/2/20 3/9/20 Vingle Coated Chain Link Fence 7 0%
3/2/20 3/7/20 Turfgrass Planting & Irrigation 5 0%
2/10/20 2/16/20 Concrete for Pool Structure (C-I-P) 6 0% 9/16/19 1/31/20 Concrete Formwork 135 47%
5/7/19 10/11/19 Concrete Reinforcement 154 100%
6/7/19 10/8/19 Metal Fasteners and Bolts 121 100%
4/2/19 10/8/19 Cast-In-Place Buildings 186 100%
6/2/19 10/18/19 Cast-In-Place 136 100%
2/10/20 2/16/20 Pneumatically Place Concrete for Pools 6 0% 9/18/19 12/13/20 Mortar and Masonry Grout 445 100%
9/18/19 12/13/20 Cast-Stone Masonry Lintels 445 100%
9/18/19 12/13/20 Unit Masonry Assemblies 445 100%
9/18/19 10/7/19 Blok-Flash 19 100%
10/14/19 3/7/20 Rough Carpentry 143 75%
10/14/19 3/7/20 Miscellaneous Carpentry 143 50%
10/14/19 3/7/20 Finish Carpentry 143 50%
10/14/19 3/7/20 Interior Architectural Woodwork 143 0%
6/24/19 7/24/19 Concrete Sealer 30 100%
6/24/19 6/25/19 Below Grade Vapor Retarder 1 100%
5/15/19 8/15/19 Self-Adhering Sheet Waterproofing 90 100% 5/15/19 8/15/19 Pre-Applied Sheet Membrane Waterproofing 90 100% 5/15/19 8/27/19 PVC Waterstops 102 100%
3/2/20 3/9/20 Building Insulation 7 0%
10/1/19 3/7/20 Metal Roof Panels 156 75%
10/1/19 3/7/20 Self-Adhered Roofing Underlayment 156 50% 10/1/19 3/7/20 Flashing and Sheet Metal 156 50%
10/1/19 3/7/20 Gutters and Downspouts 156 50%
10/1/19 3/7/20 Roof Accessories 156 50%
5/15/19 3/7/20 Joints Seals 292 65%
10/28/19 2/17/20 Steel Doors and Frames 109 80%
10/28/19 2/17/20 Fiberglass Doors and Frames 109 33%
10/28/19 3/9/20 Unit Skylights 131 50%
Ruth Tang
Stan Lanier
Thermal and Moisture Protection
Doors and Windows
Wood and Plastic
Masonry
Concrete
%DURATION
(days)
General Requirement
Site Work
Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 SAMPLE
19 225
Billing & Payments
You should get what you pay for; in this industry that does not always happen. With USA Construction as your partner you can rest easy that when we submit a pay application, its has been checked, double checked, and triple checked. With the use of an AIA Payment application you will always know where your project stands and how your payments are calculated.
APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 PAGE ONE OF PAGES TO OWNER: PROJECT: 1 Distribution to:
OWNER
ARCHITECT
0/00/0000 CONTRACTOR
FROM CONTRACTOR: VIA ARCHITECT:
CONTRACT FOR: 0/00/0000
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, Application is made for payment, as shown below, in connection with the Contract. information and belief the Work covered by this Application for Payment has been Continuation Sheet, AIA Document G703, is attached. completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
1. ORIGINAL CONTRACT SUM $ 0.00
2. Net change by Change Orders $ 0.00 CONTRACTOR:
3. CONTRACT SUM TO DATE (Line 1 ± 2) $ $ 0.00
4. TOTAL COMPLETED & STORED TO $ 0.00
DATE (Column G on G703) By: Date:
5. RETAINAGE:
a. 10 % of Completed Work $ $0.00 State of: County of:
(Column D + E on G703) Subscribed and sworn to before me this day of b. % of Stored Material $ Included in above Notary Public:
(Column F on G703) My Commission expires:
Total Retainage (Lines 5a + 5b or
Total in Column I of G703) $ 0.00 ARCHITECT'S CERTIFICATE FOR PAYMENT
6. TOTAL EARNED LESS RETAINAGE $ 0.00 In accordance with the Contract Documents, based on on-site observations and the data (Line 4 Less Line 5 Total) comprising the application, the Architect certifies to the Owner that to the best of the
7. LESS PREVIOUS CERTIFICATES FOR Architect's knowledge, information and belief the Work has progressed as indicated, PAYMENT (Line 6 from prior Certificate) $ 0.00 the quality of the Work is in accordance with the Contract Documents, and the Contractor
8. CURRENT PAYMENT DUE $ 0.00 is entitled to payment of the AMOUNT CERTIFIED.
9. BALANCE TO FINISH, INCLUDING RETAINAGE $ 0.00 (Line 3 less Line 6) AMOUNT CERTIFIED . . . . . . . . . . . $ CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Total changes approved Application and onthe Continuation Sheet that are changed to conform with the amount certified.) in previous months by Owner ARCHITECT:
Total approved this Month By: Date:
TOTALS $0.00 $0.00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without NET CHANGES by Change Order prejudice to any rights of the Owner or Contractor under this Contract.
AIA DOCUM ENT G702 · APPLICATION AND CERTIFICATION FOR PAYM ENT · 1 992 EDITION · AIA · ©1 992 THE AM ERICAN INSTITUTE OF ARCHITECTS, 1 735 NEW YORK AVE., N.W., WASHINGTON, DC 20006-5292 Users may obtain validation of this document by requesting a completed AIA Document D401 - Certification of Document's Authenticity from the Licensee.
PERIOD TO:
APPLICATION NO:
$0.00
CONTRACT DATE:
PROJECT NOS:
SAMPLE
20 226
Site Cleanliness
We all know construction is a messy business, but that does not mean the jobsite has to be sloppy.
The construction director will be performing monthly or bi-weekly site walks depending on the project and the stage of completion. You can trust and believe in an organized, well run and safe jobsite when working with USA Construction.
Our team holds every member of the crew accountable for their work area daily. Our goal is to leave as little footprint as possible when building your aquatic facility.
21 227
Quality Control Assessments
With USA Construction as your preferred partner, rest
assured that our focus is always on the quality of our
work/product!
Each week your project manager is going to check in with you, the director and the super individually. During this check ins your project manager will utilize a quality
control assessment form to make sure that the partner, the director and the on site superintendent are satisfied and up to date on what has been completed, what is currently in progress, what needs correcting, the plan for correcting and what are the next steps towards success and project completion.
22 SAMPLE
228
Quality Control Assessments
23 SAMPLE
229
Quality Control Assessments
24 SAMPLE
230
Quality Control Assessments
25 SAMPLE
231
Our Partners
Newly-designed commercial and residential
pool filter packs are made of thick
fiberglass lids with a one-inch floor for no
warping and easy drainage. Aquaworx uses
stainless hardware on our hinges and
latches in addition to unions on all pumps
for easy removal. 26
232
Our Partners
SAFESWAP
ANCHORING SYSTEM
Attractive ground caps are
substituted for future play products
Easily add future play elements with no
change to infrastructure
Easily move products from one location
to another at no additional cost
Provides flexibility to spread investment
over time as capital becomes available
Structural stainless-steel base
for maximum strength
Optional interim spray cap (as shown)
27 233
Our Partners
28 234
Our Partners
29 235
Our Partners
30 236
Our Partners
31 237
Our Partners
32 238
Our Partners
33 239
USA CONSTRUCTION
PROPOSAL FOR:
Lynwood Natatorium Pool Resurfacing Project
This Agreement, between the undersigned, City of Lynwood (herein referred to as “Owner”), hereby contracts with USA Construction (herein after referred to as “Contractor”) for the installation described below at the price, terms, and conditions set forth herein.
JOB ADDRESS: 3770 Martin Luther King Jr Blvd, Lynwood, CA 90262 MAIL ADDRESS: 3770 Martin Luther King Jr Blvd, Lynwood, CA 90262
CONTRACT PRICE (in words): Three Hundred Eighty-Six Thousand One Hundred Seventy dollars 0/100 CONTRACT PRICE (in numbers): $386,170.00
Payable as follows:
PAYMENT SCHEDULE
USA CONSTRUCTION agrees to furnish and pay all labor, material, equipment, taxes, insurance, and do all things necessary for the proper construction and completion of swimming pool at Lynwood Natatorium, Located in Lynwood, CA in accordance with the requirements of the local Health Department in effect on the date of this Agreement, and as shown on the plans provided by the Owner. Without limiting the generality of foregoing, the work is generally described as the construction of a swimming pool the shape and size specified on the attached plan and as described in the Plans and Specifications provided by the Owner.
Any written notices, which may be required herein, shall be mailed by Registered or Certified US Mail, return receipt requested, to the Contractor at the following address:
USA Construction
1595 Peachtree Pkwy
Suite 204-344
Cumming, GA, 30041
DUE
Total Contract Price Mobilization Demo Material Tile Paint Lights Deck Plaster Final 1 Year $386,170.00 $19,308.50 $57,925.50 $61,787.20 $38,617.00 $23,170.20 $11,585.10 $57,925.50 $96,542.50 $19,308.50 Not reflective of actual agreement. One would be modified to reflect cost and scope upon award 240
SCOPE:
Proving all necessary supervision, labor, materials, equipment, machinery, and management required to complete the resurfacing of the Lynwood Natatorium pool.
The project activities will include, but are not limited to, the following tasks:
• Coordination with the Los Angeles County Health Department to ensure compliance with all applicable health and safety requirements.
• Removal of the existing interior pool coating and finish through sandblasting. • Replacement of any damaged or deteriorated pool tiles. • Application of a new white pool paint finish with black lane markings. • Preparation, repair, and repainting of the pool overflow gutter.
All work shall be performed in accordance with applicable industry standards, safety regulations, and the City’s quality expectations to ensure the long-term durability and enhanced appearance of the facility.
Please refer to the RFP documents for full Scope of Work
241
PLANS:
Owner is required to provide Contractor with three (3) full sets of engineer stamped plans upon signing of agreement.
Contractor cannot start the project or the permit process without three (3) full sets of engineer stamped plans. Plans must include drawings of pool layout with depths and dimensions of pool, plumbing layout of pool, and all electrical lines for pool to include pump room layout and pool lights. Contractor can provide these plans at an additional fee to the agreement cost.
POOL OPERATIONS
The Contractor shall put the filtration equipment into operation. The Contractor shall provide oral instructions; as well as provide all owners’ manuals to Owner. The premises shall be cleared of all excess materials, tools, equipment and debris from construction site.
This bid assumes there are no underground rocks or structures, quicksand, lakes, trash dumps or Fuel tank, and there is reasonable access to the job site. This bid also assumes there is acceptable soil type and compaction to support pool structure and decks.
Owner represents that he/she has title to the land, that the pool is located within the property lines and clear setbacks, underground installations and overhead power lines, and that the pool and equipment location complies with applicable zoning laws.
CHANGE ORDERS
Any additional work that is above and beyond the original scope of work listed above shall be invoiced separately and payment shall be due upon completion of additional work that was approved by Owner in the change order. Any change orders that are more than $2,000.00 shall require a 50% deposit with the written approved change order.
Payment terms listed below shall apply to all change orders.
ADDENDA
The following Addenda are pursuant to, and part, of this Agreement:
_______N/A_________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________
PERSONNEL/SUBCONTRACTORS
Whereas, Company will invest substantial resources to train and convey information concerning operational/construction techniques and management procedures to its personnel and subcontractors at Owner's facility, Owner acknowledges that such information and investment is a valuable asset of Company's business. Owner agrees not to hire or contract (without the prior written consent of Company) any personnel or former personnel of the Company directly or indirectly to work at, service, or be connected in any way with the project named herein for a period of one (1) year from the date of completion or cancellation of this agreement. Owner further agrees not to contract for any work performed at project as described herein with any subcontractor hired by Contractor (without the prior written consent of Company) to perform work on project listed above herein for a period of one (1) year from the date of completion or cancellation of this agreement. Hiring of subcontracts by Owner is a direct breach of this agreement and a violation of the permit status of this project.
242
PAYMENT TERMS
Contract Payments are due as indicated above. Any contract payment not made within ten (10 days of the schedule listed above shall be subject to a delinquent payment of five percent (5%) of the amount due or any portion thereof.
In the event contract payments are not received within fifteen (15) days of the schedule listed above, the Company shall have the right, at it's option, and within its sole discretion, to interrupt or terminate its services under this Agreement and to withdraw and remove all personnel and supplies from Owner's premises without any further or additional notice to Owner. Any such interruption or termination notwithstanding, Owner shall be fully responsible for all payments provided herein. In the event that Company is required to collect payment at Owner’s establishment, Owner agrees to pay an amount not to exceed $350.00 for courier services.
In the event that the Company elects to pursue collection of any amounts due under this Agreement, Owner shall pay all said amounts, together with the interest at the rate of 18% per annum from the date the same became due, together with any and all cost of collection, including and together with any and all reasonable litigation expenses, including reasonable attorneys fees.
Further, Contractor will not assume any liability or responsibility for any work during the Warranty Period until all invoices are paid and Owner’s account is current.
CANCELLATION
The Owner shall have the right to cancel this Agreement based on Company's non-performance of duties and responsibilities as follows:
(1) Owner shall notify corporate office (1595 Peachtree Pkwy Suite 204-344 Cumming, GA, 30041) by certified mail and by phone of any problem regarding performance as detailed in the Agreement. Company shall have ten (10) business days following receipt of certified notification to remedy stated violation of agreement. (Remedy Period) (2) If Company fails to remedy the violation within the Remedy Period as detailed in this Agreement; Owner may then cancel this Agreement by providing Company written notice of cancellation via certified mail, within ten (10) days of the end of the remedy period. This Agreement shall then terminate five (5) days after the receipt thereof by the Company and be considered the Termination Date.
CLOSE OUT/SUBSTANTIAL COMPLETION
Owner is required to attend a Close Out walk through of job site within 3 days of Substantial Completion of project.
Substantial Completion is achieved when facility/pool is usable and or permitted for operations. If Owner does not attend the Close Out walk through, Owner agrees to final completion and payment of all outstanding invoices, including any and all retainage.
WARRANTY PERIOD/WARRANTY REVIEW
Contractor provides a one-year warranty (Warranty Period) on all parts and labor for this project. The Warranty Period on parts is limited to the extent of the Manufacture’s warranty for each part. Owner is entitled to request a Warranty Review throughout the Warranty Period as long as all outstanding payments/invoices are completely paid to Contractor. In order to request a Warranty Review of the project, Owner is required to submit the request in writing to our office via certified mail detailing any item they would like the Contractor to review under our warranty terms.
Upon receipt of Warranty Review, Contractor will have ten (10) days to provide a written response to the Owner's Warranty Review request. If Warranty Review contains items that fall within the warranty provided under this agreement, Contractor has thirty (30) days to correct those items that fall under our warranty from date of acceptance of Owner's Warranty Review. Page 5
243
Warranty Period begins upon Substantial Completion and completion of Close Out walk through. However, a Warranty Review will not be accepted at any time until Owner has paid all contract payments and outstanding invoices due on this project.
GOVERNING LAW
This Contract shall be governed by and construed according to the Laws of where the Company is domiciled. Venue for any disputes arising out of this Contract shall be in the State or Superior Courts of where the Company is domiciled.
MODIFICATION
This Agreement constitutes the entire agreement of the parties and supersedes any prior agreements, understandings or negotiations, written or oral. This Agreement may not be modified or amended except in writing, signed by both parties hereto. This Agreement shall be binding to ensure the benefit of the Owner and Contractor and so their respective heirs, successors and assigns.
STRICT COMPLIANCE
No failure of Contractor to exercise any power or right granted herein, or to insist compliance by Owner with its obligations and duty herein shall constitute a waiver of Contractor’s right to demand strict compliance with the provisions hereof at any time.
SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those to which it is held invalid or unenforceable, shall not be affected thereby and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law.
NONWAIVER
Owner and Contractor agree that no failure to exercise and no delay in exercising any right, power or privilege under this Agreement on the part of either party shall operate as a waiver of any right, power, or privilege under this Agreement.
ATTORNEYS FEES
In the event of legal action to enforce the rights of the Contractor or Owner, under the terms of this Agreement, the parties agree that the Contractor shall be entitled to receive as additional damages, any and all litigation expenses, including attorney’s fees.
GOOD FAITH
USA Construction has provided this proposal in good faith based on information obtained from the owner and from our inspections.
MISCELLANEOUS
Acts of God, natural phenomenon, previous damage or irregularities, or those inconsistencies beyond the control of USA Construction may give cause to the contractor to advise the owner of a change in scope of the work. This change may necessitate an adjustment in price, or a modification in some part of the work to be performed.
244
PROPOSAL EXPIRATION DATE
This contract is void at the Company’s option if not executed by the Owner and returned to the Company 14 days after May 28, 2026.
BINDING AGREEMENT
This instrument shall become effective as of ___________________. The Agreement shall become binding upon the signature and /or seal of both parties.
ACCEPTANCE
Acceptance of this Agreement by Owner through signatures below and return of this Agreement along with any payments due hereunder will constitute a contract entered into in accordance with the specifications, terms and conditions and addenda attached hereto.
Thanks for your confidence in USA Construction.
USA CONSTRUCTION City of Lynwood
By: USA Construction, LLC By: _________________________ Authorized Agent- “Owner”
Officer: _____________________ Title: _____________________ DATE: _______________________ DATE: _______________________
245
Part 1 BD - 13
1.3.1 BID (PROPOSAL AND WORKERS’ COMPENSATION CERTIFICATE)
BID TO: CITY OF LYNWOOD, CALIFORNIA
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with the City in the form of agreement in cluded in Subsection 1.4.1 of the Contract Documents (the “Agreement”) to perform the Work as specified or indicated in said Contract Documents entitled:
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
CITY OF LYNWOOD
CIP PROJECT NO. 4011.68.113
Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and th e Instructions to Bidders dealing with the disposition of the Bid Security.
This Bid will remain open for the period stated in the Notice Inviting Bids, unless otherwise required by law.
Bidder will enter into the Agreement within the time and in the manner required in the Instructions to Bidders, and will furnish the proof of insurance/certificates, insurance endorsements, Payment Bond, Performance Bond, and all Licenses and Permits within the time and in the manner required by the Contract Documents.
Bidder has examined copies of all the Contract Documents, including the following ADDENDA (receipt of which is hereby acknowledged):
Number 1 Date
Number 2 Date
Number 3 Date
Number 4 Date
Number 5 Date
Number 6 Date
Bidder has familiarized itself with the nature and extent of the Contract Documents, the Work, the site, the locality where the Work is to b e performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress, or performance of the Wor k, and has made such independent investigations as Bidder deems necessary.
04/23/2026
246
Part 1 BD - 14
In conformance with the current statutory requirements of California Labor Code Section 1860, et seq., the undersigned confirms the following as its certification:
I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.
Attached hereto are the following completed and fully-executed documents:
(1) Bid Schedule consisting of two (2) pages;
(2) List of Subcontractors;
(3) Anti-Trust Claim;
(4) Non-Collusion Affidavit;
(5) Bidder’s General Information; and
(6) Bidder’s Insurance Statement.
Bidder agrees to complete the Work required under the Contract Documents within the time stipulated in said Contract Documents, and to accept as full payment therefor the Total Bid Price based on the Lump Sum or Unit Bid Price(s) set forth in the attached Bid Schedule(s).
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.
Dated:
Bidder:
By:
(Signature of Bidder’s Authorized Representative)
Title:
05/26/2026
USA CONSTRUCTION LLC
Office Administrator
247
Part 1 BD - 15
1.3.2 UNIT PRICE BID SCHEDULE
Schedule of Prices for the Construction of the:
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
City of Lynwood PROJECT NO.
4011.68.113
BASE BID SCHEDULE
Item
No.
Unit Price Bid Item Estimated
Quantity
Unit Unit
Price
Item Amount
1 Mobilization / Demobilization 1 LS $ $
2 Health Department drawings and permit 1 LS $ $
3 Remove Existing Pool Painted Finish by
Sandblasting. Clean and Prepare for Pool
Plaster
11,000 SF $ $
4 Water Leakage Testing for the Pool 1 LS $ $
5 Install New White Pool Plaster 11,000 SF $ $
6 Install 1” x 1” Unglazed Non-Slip Ceramic
Mosaic Tiles for (7) Lane lines with T-mark on
Both Ends
7,235
SF $ $
7 Install 1” x 1” Non-Glazed Ceramic
Mosaic Tiles for (14) Cross Wall Targets
80 SF $ $
8 Install 4” x 4” Non-Slip Ceramic Mosaic
Tiles for (2) 4’-6” Depth Band Lines
475 SF $ $
9 Prepare and Clean Overflow Gutter and Install
New White Pool Plaster at Overflow Gutter
430 LF $ $
10 Replace any Damaged or Missing Return
Covers
10 EA $ $
11 Replace any Damaged or Missing 6” x 3”
Waterline Tiles and 3” x 3” Cap Tiles
40 EA $ $
12 Fix the Grabrails around the Pool 3 EA $ $
TOTAL AMOUNT BASE BID IN FIGURES $
15,000.00
2,500.00
4.55 5,000.00
24.05 15,000.00
2,500.00
50,000.00
5,000.00
264,580.00
2.94 21,240.00
40.31 3,225.00
7.84 3,725.00
38.33 16,480.0
142.00
1,420.00
30.00 1,200.00
600.00
1,800.00
386,170.00
248
Part 1 BD - 16
TOTAL BID PRICE:
$ (Price in Figures)
(Price in Words)
386,170.00
Three Hundred Eighty-Six Thousand One Hundred Seventy dollars 249
Part 1 BD - 17
QUANTITIES OF WORK:
The quantities of work or material stated in the Unit Price items of the Bid Schedule are supplied only to give an indication of the general scope of the Work. The City does not expressly nor by implication agree that the actual amounts of work or material will correspond therewith, and reserves the right after award to increase or decrease the quantity of any Unit Price Bid Item, by an amount up to 25 percent of increase or decrease, without a change in the unit prices, and shall have the right to dele te any bid item in its entirety, and receive full cre dit in the amount shown in the Bid Schedule for the deleted item of Work.
Name of Bidder or Firm
IN CASE OF DISCREPANCY BETWEEN THE WORDS AND FIGURES, THE WORDS SHALL PREVAIL.
USA CONSTRUCTION LLC
250
Part 1 BD - 18
INFORMATION REQUIRED OF BIDDER
1.3.3 LIST OF SUBCONTRACTORS
As required under Section 4100 et seq., of the Publ ic Contract Code, the Bidder shall list below the name and business address of each subcontractor who will perform Work under this Bid in excess of one-half of one percent of the Contractor's Total Bid Price, or in the case of bids for the construction of streets or highways, including bridges, in excess of one-half of one percent of the Contractor’s Total Bid Price, or ten thousand dollars ($10,000), whichever is greater, and shall also list the portion of the Work which will be done by such subcontractor.
After the opening of Bids, no changes or substitutions will be allowed except as otherwise provided by law. The listing of more than one subco ntractor for each item of Work to be performed with the words "and/or" will not be permitted.
The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Total Bid Price except that any d esignated “Specialty Items” may be performed by subcontract. The amount of any such “Specialty Items” so performed may be deducted from the Total Bid Price before computing the amount required to be performed by the Contractor with its own organization. The City will identify any "Specialty Items” in the Bid Schedule(s). Where an entire Specialty Item is subcontracted, the value of work subcontracted will be based on the Contract Unit Pr ice for that item. When a portion of a Specialty Item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contract Unit Price for that item. This will be determined from information submitted by the Contractor and subject to approval by the Engineer.
Subcontractor
Contractor's
Percent
Work to be Performed
License
Number
of Total
Contract
Subcontractor's Name & Address
1. 2.
3. 4.
5. 251
Part 1 BD - 19
1.3.4 ANTI-TRUST CLAIM
Pursuant to Public Contract Code Section 7103.5, up on acceptance of its bid, Contractor agrees to the following: “In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Se ction 4 of the Clayton Act (15 U.S.C.
Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Cod e), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at th e time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties.”
RESPECTFULLY SUBMITTED:
Contractor Name
Signature Address
City, State, Zip Telephone (with area code)
Title Date
Contractor's License No. Type of License
Federal I.D. No.
(SEAL--if Bid is by a corporation)
ATTEST
USA CONSTRUCTION LLC
Los Angeles, CA 90034
Office Administrator
1015575
83-3599409
1976 S. La Cienega Blvd Suite 277
877-248-1872
05/26/2026
C-53
252
Part 1 BD - 20
1.3.5 NON-COLLUSION AFFIDAVIT
(To be Executed by Bidder and Submitted with Bid Pursuant to Public Contract Code Section 7106)
State of Georgia, County of
,
being first duly sworn, deposes and says that he or she is of
the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and further, that the bidder has not , directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Signature
Typed or Printed Name
Title
Contractor / Company / Bidder Name
Subscribed and sworn to before me this day of , 20
Notary Public in and for the State of Georgia
My Commission Expires:
Fulton
Yohanna Makonnen
Office Administrator
USA CONSTRUCTION LLC
Yohanna Makonnen
Office Administrator
USA CONSTRUCTION LLC
253
Part 1 BD - 21
1.3.6 BID BOND
KNOW ALL MEN BY THESE PRESENTS , that we, the undersigned, as Principal, and
as Surety, are
hereby held and firmly bound unto the City of Lynwood, a California Municipal Corporation, (hereinafter referred to as the “City”) in the penal sum of
DOLLARS
($ ), being not less than ten percent (10%) of the Total Bid Price, for the payment of which sum in lawful money of the United States, well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns by these presents.
The Condition of the above obligation is such that whereas the Principal has submitted to City a certain Bid, attached hereto and hereby made a part hereof, to enter into a contract in writing with City for the completion / construction / demolition of Project No. 4011.68.123, entitled:
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
NOW, THEREFORE,
a. If said Bid shall be rejected, or
b. If said Bid shall be accepted and the Principal shall execute and deliver to the City a contract in the form of agreement set forth in th e Contract Documents (properly completed in accordance with said Bid) within ten (10) calendar days after receipt of same from City, and shall, within the time and mann er set forth in the Contract Documents, furnish a Bond for his/her faithful perf ormance of said contract and for the payment of all persons performing labor or furn ishing materials in connection therewith, the required proof of insurance/certific ates, required insurance endorsements, and shall in all other respects perform the agreement created by the acceptance of said Bid,
then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligation of said Surety and its Bond shall be in no way impaired or affected by any extension of the time within which the City may accept such Bid; and said Surety does hereby waive notice of any such extension. In the event suit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorney's fee to be fixed by the court.
USA CONSTRUCTION LLC
Individual Surety Mike Price
Thirty-Eight Thousand Six Hundred Seventeen
38,617.00
254
Part 1 BD - 22
IN WITNESS WHEREOF , the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers on this day of , .
PRINCIPAL SURETY
(Legal Company Name) (Legal Company Name)
By: By:
Title: Title:
(Corporate Seal) (Corporate Seal)
IMPORTANT : Surety companies executing Bonds must possess a c ertificate of authority from the California Insurance Commissioner authoriz ing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the Work or Project is financed, in whole or in part, with federal grant o r loan funds, must also appear on the Treasury Department's most current list (Circular 5 70 as amended). Notary acknowledgements for Principal and Surety signature s and Power of Attorney for Surety must be attached. THIS IS A REQUIRED FORM .
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent
or Representative in California
if different from above)
(Telephone Number of Surety and Agent
or Representative in California)
26 May
2026
USA CONSTRUCTION LLC
Office Administrator
Individual Surety Mike Price
7643 Gate Parkway Suite 104-692,
Jacksonville, FL 32256
255
Part 1 BD - 23
1.3.7 BIDDER'S GENERAL INFORMATION
The Bidder shall furnish the following information. Failure to complete and attach all items may cause the Bid to be rejected as non-responsive.
1. BIDDER/CONTRACTOR'S Name and Street Address:
2. CONTRACTOR'S Telephone Number: ( )
Facsimile Number: ( )
3. CONTRACTOR'S License: Primary Classification
State License Number(s)
Supplemental License Classifications
4. Surety Company and Agent who will provide the req uired Bonds on this Contract:
Name of Surety:
Address:
Surety Company Agent:
Telephone Numbers: Agent ( ) Surety ( )
5. Type of Business Entity (Sole Proprietorship, Par tnership, Corporation, etc.):
6. Corporation organized under the laws of the Stat e of:
7. Is your business entity qualified to do business in the State of California? Date qualified.
8. List the names, addresses and titles of the prin cipal members/officers of your business entity:
Name Title Address
USA CONSTRUCTION LLC
1976 S. La Cienega Blvd Suite 277, Los Angeles, CA 90034 877 248-1872
877 248-1872
C-53
1015575
Individual Surety Mike Price
7643 Gate Parkway Suite 104-692, Jacksonville, FL 32256 Mike Price
855 794-6764
Limited Liability Corporation
Wyoming
Yes
Leonardo Escalante
Owner
1976 S. La Cienega Blvd Suite 277, Los Angeles, CA 90034 256
Part 1 BD - 24
1.3.7 BIDDER'S GENERAL INFORMATION (Continued)
9. Number of years’ experience as contractor perfor ming the specific type of construction or Work required for this Project as set forth in the Contract Documents:
10. List at least three projects completed to date involving construction or Work similar to that required for the completion of this Project:
a. Owner Address
Contact Class of Work
Phone Contract Amount
Project Date Completed
b. Owner Address
Contact Class of Work
Phone Contract Amount
Project Date Completed
c. Owner Address
Contact Class of Work
Phone Contract Amount
Project Date Completed
11. Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:
12. List the name and title of the person who will supervise full-time the proposed work for your firm:
13. Is full-time supervisor an employee or an inde pendent contractor?
14. Please attach resumes of key construction personnel who will be assigned to the Work on this Project.
Note: Bidder agrees that personnel named on this form and in the attached resumes will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.
15. A financial statement or other information and refe rences sufficiently comprehensive to permit an appraisal of your current financial condition may be required by the Engineer. 25 No
Alison Abbott, Project Manager
City of Atlanta
Savannah Chatham Public Schools
Laurel Natatorium
$700,000
$700,000
$75,000
12/2025
10/2025
08/2023
Sedrick Hicks
James May
Warren Holladay
832-517-6321
770-595-3870
601-577-5814
Replaster, leak detection,
and tile replacement of 3 pools
Renovation and build of
Municipal pools and Splash pads
Boiler Replacement
Atlanta, GA (multiple locations)
Savannah, GA ( 3 locations)
4978 US-84, Laurel, MS 39443
X
257
Part 1 BD - 25
1.3.8 BIDDER’S INSURANCE STATEMENT
(To Be Submitted with Bid)
BIDDER HEREBY CERTIFIES that the Bidder has reviewed and understands the insurance requirements set forth in Subsection 1.4. 4 of the Bidding and Contractual Documents and Forms, Subsection 2.7.2 of the Specia l Provisions and elsewhere in the Contract Documents. Should the Bidder be awarded th e contract for the Work, Bidder further certifies that it can meet all insurance re quirements set forth in the Contract Documents, including, but not limited to, providing or requiring insurance coverage for subcontractors; naming of City as an additional ins ured, and providing waivers of subrogation. Bidder acknowledges and understands that all cost associated with providing and maintaining the required insurance coverage are the sole responsibility of the Contractor and that the costs of procuring and main taining said coverage is included in Contractor’s Bid.
Bidder further agrees and certifies that if awarded the contract, Bidder will provide the proof of insurance and endorsements required by the Contract Documents within ten (10) calendar days of receipt of the Notice of Award. Bidder acknowledges that failure to provide City with the required insurance coverage, proof of insurance and/or endorsements within ten (10) calendar days of recei pt of the Notice of Award, may result in withdrawal of award and forfeiture of the Bidder's Bid Security.
Dated:
Bidder:
By:
(Signature of Bidder’s Authorized Representative)
Title:
05/26/2026
USA CONSTRUCTION LLC
Office Administrator
258
CITY OF LYNWOOD, CALIFORNIA
ADDENDUM #2
REVISED BID SCHEDULE, REVISED LINE ITEM ON TECHNICAL
PROVISIONS AND REVISED BID DUE DATE
for
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
(Rebid)
Date Issued: April 23rd, 2026
259
Addendum #2, Page 1 of 2
Addendum for: Lynwood Natatorium Pool Resurfacing Project (Rebid)
Addendum No.: 2
Addendum Date: April 23rd, 2026
Issued by: City of Lynwood
Reminder 1: Bids are due at 10:00 AM on May 28th, 2 026.
Reminder 2: Please acknowledge receipt of this Adde ndum in your proposal.
Addendum #1 revises the following:
Revised Bid Due Date to reflect the correct project timeline. (Pg. ii & iii) Revised Bid Schedule (Pg. Part 1 BD – 15 & 16)
Revised Line Items No. 3 & 5 on Technical Provisions (Pg. Part 3 BD – 34 & 35)
Attachments:
Attachment A – Revised Bid Schedule & Specifications.
Issued by City of Lynwood
Nam Tran, P.E., QSP/QSD
Associate Engineer
___________________________________
260
Addendum #2, Page 2 of 2
ATTACHMENT A -
REVISED BID SCHEDULE, LINE ITEM ON
TECHNICAL PROVISIONS AND BID DUE DATE
PER ADDENDUM #2
261
ii
CITY OF LYNWOOD
PUBLIC WORKS DEPARTMENT
CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
IN THE CITY OF LYNWOOD, CALIFORNIA
PROJECT NO. 4011.68.113
Bids Due by May 28th , 2026 at 10:00 AM
Prepared By:
CITY OF LYNWOOD
262
iii
CITY OF LYNWOOD
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
PROJECT NO. 4011.68.113
The Special Provisions contained in these Contract Documents have been prepared by, or under the direct supervision of, the following Registered Civil Engineer:
Engineer: Ahmad Ansari, P.E.
Title: Contract City Engineer
Name of Firm or Agency: City of Lynwood
The Bidding Schedule is as follows:
Release Date: March 25 th , 2026
Last Date to Submit Questions: April 6 th , 2026
RFI Response Posted: April 14 th , 2026
Bid Due Date: May 28th , 2026 at 10:00 a.m. (PST)
City Council Awarding Date: August 18 th , 2026
263
Part 1 BD - 15
1.3.2 UNIT PRICE BID SCHEDULE
Schedule of Prices for the Construction of the:
LYNWOOD NATATORIUM POOL RESURFACING PROJECT
City of Lynwood PROJECT NO.
4011.68.113
BASE BID SCHEDULE
Item
No.
Unit Price Bid Item Estimated
Quantity
Unit Unit
Price
Item Amount
1 Mobilization / Demobilization 1 LS $ $
2 Health Department drawings and permit 1 LS $ $
3 Remove Existing Pool Paint Finish and Pool
Plaster. Clean and Prepare for new Pool
Plaster
11,000 SF $ $
4 Water Leakage Testing for the Pool 1 LS $ $
5 Install New White Pool Plaster 11,000 SF $ $
6 Install 1” x 1” Unglazed Non-Slip Ceramic
Mosaic Tiles for (7) Lane lines with T-mark on
Both Ends
7,235
SF $ $
7 Install 1” x 1” Non-Glazed Ceramic
Mosaic Tiles for (14) Cross Wall Targets
80 SF $ $
8 Install 4” x 4” Non-Slip Ceramic Mosaic
Tiles for (2) 4’-6” Depth Band Lines
475 SF $ $
9 Prepare and Clean Overflow Gutter and Install
New White Pool Plaster at Overflow Gutter
430 LF $ $
10 Replace any Damaged or Missing Return
Covers
10 EA $ $
11 Replace any Damaged or Missing 6” x 3”
Waterline Tiles and 3” x 3” Cap Tiles
40 EA $ $
12 Fix the Grabrails around the Pool 3 EA $ $
TOTAL AMOUNT BASE BID IN FIGURES $
15,000.00
2,500.00
50,000.00
264,580.00
5,000.00
21,240.00
3,725.00
3,225.00
16,480.0
1,420.00
1,200.00
1,800.00
15,000.00
2,500.00
4.55 5,000.00
24.05 2.94
40.31 7.84
38.33 142.00
30.00 600.00
386,170.00
264
Part 1 BD - 16
TOTAL BID PRICE:
$ (Price in Figures)
(Price in Words)
386,170.00
Three Hundred Eighty-Six Thousand One Hundred Seventy dollars 265
Part 3 BD - 34
Department of Public Health, Recreational Waters. Contractors must hold a valid California State Contractors License and work within the requi rements of their classification as follows: C53 Pool Contractor: Licensed to build, replace, renovate, repair, and modify any pool.
Payment for Health Department Drawings and Permit shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for submitting the Public Health Permit Application – Environmental Health Di vision, and providing all Approvals and Permits for Pool Resurfacing per LA County Health Department ; and complying with the requirements specified in those licenses and pe rmits, coordination; and incidentals necessary to perform all related items of work.
Bid Item No. 3 – Remove Existing Pool Painted finis h and Pool Plaster. Clean and Prepare for New Pool Plaster
Remove the old paint or coatings and pool plaster of the Pool Shell and Perimeter Gutter System as well as to take away any Calcium/ Mineral s Buildup which will also help prep the swimming pool surface for a new paint application.
Lynwood Natatorium is the Public Swimming Pool with the Size of 164’-1” L x 50”-0” W along with the depths varies from 3’-0” to 12’-0”. (~ 11,000 SF) There is the Existing Layer of White Paint and Pool Plaster around the Pool Shell and the Gutter System which need to be removed as well as protect All Other Pool Amenities such as Grab Rails, Recessed Steps, I-Meter Driving Stand, Pool Heater, Piping/P lumbing, Wall Depth Markers, Gutter Access Hatch, Gutter Drain Pipes, Floor Inlet Fitting, Any Tiles; from the process.
Payment for Remove Existing Pool Painted Finish and Pool Plaste r, Clean and Prepare for New Pool Plaster shall be at the contract unit price per Square Foot (SF) and shall include full compensation for all labor a nd materials, tools, equipment, and for doing all work involved complete in place.
Bid Item No. 4 – Water Leakage Testing for the Pool
Tests: Water Leakage Test is required before plaste ring the pool since there was some leakages and crack seals previously.
Payment for Water Leakage Testing for the Pool shall be at the contract unit price per Lump Sum (LS) and shall include full compensation for all labor a nd materials, tools, equipment, and for doing all work involved complete in place.
Bid Item No. 5 – Install New White Pool Plaster
To provide a long-lasting pool finish and to comply with the requirements of the Los Angeles County Health Department, new white pool pl aster is required for the Lynwood Natatorium – Public Swimming Pool. The new pool pla ster will provide a durable and sanitary surface suitable for public pool use.
266
Part 3 BD - 35
Natatorium Swimming Pools must be lined with white plaster. There shall be no letters, images, or markings of any kind other than required safety markings on the pool shell. For the Lynwood Natatorium, all pool shell surfaces and the gutter system will be refinished with new white pool plaster to provide a consistent , long-lasting finish. All pool lane markings and required pool markings will be install ed using black tiles as markings to ensure proper visibility and compliance with public pool standards.
Standards: Swimming Pool Plaster shall conform with requirements of California Building Code and Los Angeles County Health Department. Mate rials (Cement / Aggregate):
Please use White Plaster (Standard) per Los Angeles County Health Department Requirements. Water for Swimming Pool Plaster shall be clean and free from injurious amounts of acid, alkali, and organics. Color: Pool Plaster shall be white in color. Tests:
Water Leakage Test is required before plastering the pool since there was some leakages and crack seals previously.
Application: Finish shall be applied to a 1/2” Mini mum thickness over the entire surface.
The walls shall be scratch-coated followed by a fin ish coat. Materials applied to the floor after the walls have been applied shall be accelera ted to assure uniform setting time throughout the pool surface. Float the Plaster to a uniform plane and trowel to as smooth, dense, impervious surface using extreme care to avo id stains. Take special care in finishing around pool fittings, making sure to mask off or plug openings so as not to fill such openings with excess plaster. Be certain to co mpletely enclose pool fittings with plaster to insure a leak-proof seal around pipes, fittings, lights, anchors, etc.
Payment for Install New White Pool Paint shall be at the contract unit price per Square Foot (SF) and shall include full compensation for all labor and materials, tools, equipment, and for doing all work involved complete in place.
Bid Item No. 6 – Install 1” x 1” Unglazed Non-Slip Ceramic Tiles for (7) Lane Lines with T-Mark on Both Ends
The Lane Lines with "T" Marking, or "T-line," in swimming pools is part of the lane design that helps swimmers maintain orientation and gauge their distance from the wall.
Extending horizontally from the main centerline abo ut 5 feet typical before the pool wall, it serves as a visual cue signaling that the wall is nearby. These markings help swimmers stay straight in their lanes and anticipate turns o r finishes—particularly useful for backstroke swimmers, who rely on them to time their flip turns or final strokes.
At Lynwood Natatorium, there are (7) Lane Lines wit h T-Mark on Both Ends of the Swimming Pool Floor, and the size of the Lane Lines with T-Mark is typically 158’ Long x 1’ Wide each per Figure-A: Lane Line Detail. All th e Existing Lane Lines including “T Markings” needs to be renovated with new 1” x 1” Unglazed Non-Slip Mosaic Tiles. Please see the As-Built Drawings for the Reference.
267
1 RESOLUTION NO. XXX.XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD
AWARDING A CONTRACT TO USA CONSTRUCTION LLC FOR THE
LYNWOOD NATATORIUM POOL RESURFACING PROJEC T (CIP
PROJECT NO. 4011.68.113); AUTHORIZING THE MAYOR TO EXECUTE
THE AGREEMENT AND AUTHORIZING THE CITY MANAGER TO
APPROVE AGREEMENT AMENDMENTS RELATED TO THE PROJECT.
WHEREAS, on March 25, 2026, the Notice Inviting Rebid was advertised on the City’s website (PlanetBids) for the Project; and
WHEREAS, the bid opening took place on the PlanetBids Platform on Tuesday, May 28th, 2026, at 10:00 A.M.; and
WHEREAS, Staff received two (2) bids; and
WHEREAS, an analysis of all bidders, including their bid schedule, license, references, and required documents, showed that USA Construction LLC was the lowest responsible and responsive bidder with a base bid of $386,170.00 and has the necessary experience and license for this type of project.; and
WHEREAS, the Project scope of work includes proving all necessary supervision, labor, materials, equipment, machinery, and management required to complete the resurfacing of the Lynwood Natatorium pool. The project activities will include, but are not limited to, the following tasks:
Coordination with the Los Angeles County Health Department to ensure compliance with all applicable health and safety requirements.
Removal of the existing interior pool coating and finish through sandblasting. Replacement of any damaged or deteriorated pool tiles. Application of a new white pool plaster and tile finish. Preparation, repair, and plastering of the pool overflow gutter.
WHEREAS, it is estimated that the project will take thirty (30) calendar days to complete the work set forth in the proposal; and
WHEREAS, the Budget includes Construction Management & Inspection, Labor Compliance, Project Management, and the Contingencies, the Total Estimated Project Construction Cost is $502,021.00; and
WHEREAS, Natatorium Renovations and Emergency Repairs Project has a total approved budget of $5,000,000. 00. To date, the amount of $1,549,360.00 has been expended on emergency repairs, maintenance and related improvements which includes the installation of a chain-link fence, emergency repairs for panoramic windows, broken doors, expansion joints, electrical repairs, relocation of gas lines, Sewer lines CCTV work, plumbing repairs preliminary pool-related work.
268
2 WHEREAS, Natatorium improvement budget is $3,450,640.00 (including: chain- linked fence, remodeling rooms and offices, exterior paint, pool equipment, pool resurfacing, and etc.) of the following funds for this project: Specified Capita Grant – $1,361,032.00; 2019 Lease Revenue Bonds - $2,089,608.00; and
WHEREAS, the approved construction budget for Natatorium Pool improvements in FY 24 –25 is $3, 450,640.00, which includes cost of the Pool Resurfacing Project with updated specifications; and
WHEREAS, no additional appropriation is needed at this time.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY FIND, PROCLAIM, ORDER, AND RESOLVE AS FOLLOWS:
Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct and incorporates them herein as findings and as substantive part of this resolution.
Section 2. The City Council of the City of Lynwood authorizes the Mayor to execute the agreement between the City of Lynwood and USA Construction LLC in a form approved by the City Attorney in the amount of $386,170.00 for the Lynwood Natatorium Pool Resurfacing Project.
Section 3. The City Council of the City of Lynwood authorizes the City Manager to approve consultant, vendor agreements, modifications, change orders, or agreement amendments related to the Project up to the available Project Budget.
Section 4. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.
Section 5. The City Clerk shall attest and certify to the passage and adoption of this Resolution and enter it into the book of original resolutions, and it shall become effective immediately upon its adoption.
(Signatures on Next Page)
269
3 PASSED, APPROVED and ADOPTED at a regular meeting of the City Council of the City of Lynwood, California, this 4th day of August 2026.
Gabriela Camacho
Mayor
ATTEST:
Maria Quinonez
City Clerk
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
Noel Tapia Sujatha Lowenthal
City Attorney City Manager
270
4 STATE OF CALIFORNIA )
)
COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a regular meeting held on the 4th day of August 2026, and passed by the following votes:
AYES:
NOES:
ABSTAIN:
ABSENT:
Maria Quinonez, City Clerk
STATE OF CALIFORNIA )
)
COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true, and correct copy of Resolution No. XXX.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this 4th day of August 2026.