[email protected] UC #795052
1 daveba nge>
ossociotes inc. J
Estimate
CA264314
MedJca.l expense• ss,000.00
Personal& AdvInjury•s1.ooo,ooo.oo
General Aggregate(perprojea) • s2.ooo,ooo.oo
Products COmplOPAgg • s:2.000.000.00
Excludesconuaaual liability
AvailableEndorsements::
Additional Insured OOgOing Oper.ittoosCG2010
Additional ln:Sured completed operations CG 2037
PrimaryNonconfllbutO<y I.FG-G-0094
wa.Jverof SUbrogattoo CG 2404
PerProjea AggregateIf<i-G-0065
Per Location Aggregate lfG-G-0064
AutoUabillty Limits::
{AnyAuto.Hired Autos.Non-Owned Autos)
CombinedSingle limit s1,ooo,ooo.oo
AvallabieEndorsements::
AutoBlanket Additional lmured/Walver ofSubrogationc.\1353 WOl1(e,s compensation and Employers UabUity.
E.achAcdde-m • S1,000,000.00
Disease {'EaEmployee) - s1.ooo,ooo.oo
Disease{POticyUmlt)• s1,ooo,ooo.oo
wa.Jverof SUbrogattooEndorsemenc availableupon request
CAWC:040306
fnldal:
P.O.Sox1088,TUSTIN., CA92781 1-800-669-2585 OAVEBANG.COM Page4/4
[email protected] UC #795052
Addendum No.4
Addendum No.5
INSURANCE REQUIREMENTS FOR CONSTRUCTION AND
SERVICES CONTRACTS
Without limiting Contractor’s indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide, and continuously maintain at its own expense during the term of the Agreement, and shall require any and all Subcontractors and Subconsultants of every Tier to obtain and maintain, policies of insurance of the type and amounts described below and in form satisfactory to the City.
Minimum Scope and Limits of Insurance
Contractor shall maintain limits no less than:
▪ $2,000,000 General Liability (including operations, products and completed operations) per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability. Coverage shall be at least as broad as Insurance Services Office (ISO) Commercial General Liability coverage form CG 00 01. General liability policies shall be endorsed using ISO forms CG 20 10 and CG 20 37 to provide that the City and its officers, officials, employees and agents shall be additional insureds under such policies.
▪ $2,000,000 Automobile Liability combined single limit per accident for bodily injury or property damage at least as broad as ISO Form CA 00 01 for all activities of Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles. Automobile Liability policies shall be endorsed to provide that the City and its officers, officials, employees, and agents shall be additional insureds under such policies. ▪ Worker’s Compensation asrequired by the State of California and $1,000,000 Employer’s Liability per accident for bodily injury or disease. Contractorshallsubmit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers.
Maintenance of Coverage
Contractor shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, his agents, representatives, employees, subcontractors or subconsultants as specified in this Agreement.
Proof of Insurance
Contractor shall provide to the City certificates of insurance and endorsements, as required, as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the City prior to commencement of performance. Current evidence of insurance shall be kept on file with the City at all times during the term of this Agreement. Agency reserves the right to require complete, certified copies of all required insurance policies, at any time.
Acceptable Insurers
All insurance policies shall be issued by an insurance company currently authorized by the Insurance commissioner to transact business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and a Financial Size Category Class VII (or larger), in accordance with the latest edition of Best’s Key Rating Guide.
Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees, and volunteers, or shall specifically allow Contractor, or others providing insurance evidence in compliance with these specifications, to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City and shall require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.
Enforcement of Contract Provisions (non estoppel)
Contractor acknowledges and agrees that any actual or alleged failure on the part of the Agency to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City, nor does it waive any rights hereunder.
Specifications not Limiting.
Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If Contractor maintains higher limits than the minimums required above, the entity shall be entitled to coverage at the higher limits maintained by Contractor.
Notice of Cancellation
Contractor agrees to oblige its insurance agent or broker and insurers to provide to the City with thirty (30) calendar days’ notice of cancellation (except for nonpayment for which ten (10) calendar days’ notice is required) or nonrenewal of coverage for each required coverage.
Self-insured Retentions
Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible.
Self-insurance will not be considered to comply with these specifications unless approved by the City’s Risk Manager.
Timely Notice of Claims
Contractor shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional Insurance
Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgement may be necessary for its proper protection and prosecution of the Work.
REPORT TO CITY COUNCIL
Approved by:
_________________________________
Michael Lima, Director of Financial Services
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Piggyback purchase agreement change order for Fleet Division-related purchases and accompanying budget amendment
RECOMMENDATION:
Adopt a Resolution approving the State of California piggyback agreement change order in the amount of $4,535.66 with Downtown Ford of Sacramento for the purchase of three utility trucks and an accompanying budget amendment increasing appropriations in the Fleet Acquisition Fund SUMMARY:
The Fiscal Year (FY) 2022/23 Adopted Budget for the Fleet Replacement Program (Org Unit 3070- 1250, now 3065-0000) approved the purchase of new utility trucks for the Airport, Facilities, and Water Maintenance Divisions of the Public Works Department. Downtown Ford of Sacramento recently received the three chassis for these vehicles. The dealer held the original quoted price for the chassis; but, the utility bed upfitter submitted updated pricing for manufacturing and installing the specified beds. To cover the additional cost, staff is recommending approval of an accompanying budget amendment increasing the Fleet Acquisition Fund’s appropriations by $4,536.
DISCUSSION:
Council approved Ordinance 996 C.S. on December 21, 2022, which amended the City’s Municipal Code by adding Title II, Section 4 - Purchasing Procedures. This section allows the City to utilize piggyback purchasing procedures through the Procurement Services Manager to purchase supplies, equipment, or services without completing the City’s bidding or proposal process. A piggyback contract can be executed via another entity’s agreement when the items or services have already been bid by other governmental agencies or special cooperative agreements, provided such contracts are the result of a competitive bidding process, that the competitive bidding process used and all terms and conditions are substantially the same as those used by Council Meeting of: February 5, 2025
Agenda Number: B-18
the City, and that the competitive bidding process and terms and conditions contain a clause allowing piggybacking by other public agencies.
The Fleet Division consistently purchases various commodities throughout the year essential for its daily operations, ranging from vehicles and equipment to miscellaneous goods and services.
Given the diversity and volume of procurements managed by the Fleet Division, it is well-suited to efficiently utilize the piggyback procurement process.
Fleet ordered three new utility trucks for the Airport, Facilities, and Water Maintenance Divisions of the Public Works Department with PO#30230308 dated March 09, 2023. Due to constraints and delays at the factory, the dealer recently received the new chassis for the three vehicles. The dealer held the original quoted price for the chassis. However, the utility bed upfitter submitted updated pricing for manufacturing and installing the specified beds, as the original quote is nearly two years old.
Table 1 shows the price increase for the three chassis ordered on PO#30230308. The Fleet Division is requesting approval of the change order and budget amendment to cover the additional charges.
Table 1: Comparison of Old Price vs. Updated Price
Division Vehicle Original Quote New Quote Difference
Airport F350 Utility $73,309.87 $75,309.87 $2,587.17
Facilities F350 Utility $71,049.61 $71,122.13 $72.52
Water Maintenance F350 Utility $85,286.90 $87,162.87 $1,875.97 Total - $229,646.38 $233,594.87 $4,535.66
FINANCIAL IMPACT:
The original purchase was budgeted in the Fleet Acquisition Program (Org 3070-1250) FY 22/23 budget and has been carried forward to the new 3065 0000 in the 24/25 Fiscal Year. Additional funds of $4,536 will come from a transfer from the Airport, Facilities, and Water Maintenance Divisions. These three divisions have adequate savings within their budgets to pay for the additional transfer to the Fleet Acquisition Fund. However, a budget amendment is necessary for the Fleet Acquisition to pay for these additional costs.
ALTERNATIVES:
An alternative to the change order would be to not accept the change order for the price increases and not receive the trucks.
ATTACHMENTS:
1. Resolution approving State of California piggyback purchase change order.
Exhibit A: Budget amendment
2. State of California piggyback contract documentation RESOLUTION NO. _______
RESOLUTION APPROVING THE STATE OF CALIFORNIA PIGGYBACK
AGREEMENT CHANGE ORDER FOR THE PURCHASE OF THREE UTILITY TRUCKS
WHEREAS, a piggyback contract can be executed via another entity’s agreement when the items or services have already been bid by other governmental agencies or special cooperative agreements, provided such contracts are the result of competitive bidding, and that the competitive bidding process used and all terms and conditions are substantially the same as the City’s competitive bidding process and terms and conditions; and WHEREAS, the City Council (‘Council’) approved Ordinance 996 C.S. on December 21, 2022, which added Title II Section 4 Purchasing Procedures to City’s Municipal Code; and WHEREAS, Ordinance 996 C.S. allows the City to utilize piggyback purchasing procedures to purchase supplies, equipment, or services without completing the City’s bidding or proposal process, from any supplier who offers the goods or services at the same or better price, terms, and/or conditions as the supplier previously offered to another public; and WHEREAS,staff has conducted a due diligence and determined that a piggyback purchase through State of California best meets the City’s interests; and WHEREAS, the three utility trucks were ordered on PO 3023-0308 dated 03/09/2023; and WHEREAS, the piggyback was approved by Council on May 17, 2023 with Resolution 23- 65; and
WHEREAS, the original purchase order was based on March 2023 pricing; and WHEREAS, the increased cost for the three chassis is $4,535.66 higher than the original quote; and
WHEREAS, the Fleet Division needs a change order and budget amendment to pay for the increased price.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA does hereby resolve, find, and order as follows:
1. The above recitals are true and correct and are incorporated herein by this reference.
2. The Council finds that the use of piggyback purchases per the City’s Municipal Code, Title II, Section 4 - Purchasing Procedures is appropriate, and is in the best interest of the city.
3. The Council approves the State of California piggyback change order agreement for purchase of utility trucks for Airport, Facilities, and the Water Maintenance Divisions in the amount of $4,535.66.
4. The City Manager is authorized to enter into agreements(s) for each of the items listed above, consistent with the material terms of the State of California agreements and California law, and subject to approval as to legal form by the City Attorney.
5. The budget amendment for $4,536 is approved. The Director of Financial Services is directed to adjust the City’s Fiscal Year 2024/25 Amended Budget in the amount of the approved amendment,
6. This Resolution shall take effect immediately upon its adoption. * * *
EXHIBIT A
CITY OF MADERA FISCAL YEAR 2024/2025 BUDGET APPROPRIATION FOR 3 UTILITY TRUCKS CHANGE ORDER
FUND ORG CODE
OBJECT
CODE DESCRIPTION (+) (-)
EQUIPMENT FUND
3065 30650000 4355 Transfer
4,536
Vehicles &
3065 30650000 7000 Equipment
4,536
TOTALS 4,536 4,536
ATTACHMENT 2
State of California Piggyback Contract Documentation
https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Fleet/11-2024/Contract-UserInstructions---TRUCKS---Supplement-15.docx https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Fleet/11-2024/Attachment-APricing---TRUCKS---Supplement-15.xlsx https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Fleet/11-2024/Attachment-D--- Vehicle-Specifications---Supplement-15.xlsx
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
Agenda Number: ___________
________________________________
Joseph Hebert, Parks & Community Services Director
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Black Saints United Fee Waiver Request for the Black History Month Celebration Event RECOMMENDATION:
Adopt a Resolution waiving the rental fees of the Pan American Community Center on February 16, 2025, related to a Black History Month Celebration hosted by the Black Saints United, at an anticipated fee rental of $935
SUMMARY:
The City has received a request from the Black Saints United seeking a waiver of rental fees for the use of the Pan American Community Center (PACC) to host the annual Black History Month Celebration. The event is scheduled for Sunday, February 16, 2025, from 3:00 p.m. to 5:00 p.m.
DISCUSSION:
The Black Saints United have submitted a formal request to use the PACC, specifically in the gym area, for their annual Black History Celebration event. The event is planned for Sunday, February 16, 2025.
February is Black History Month, an annual celebration of achievements by African Americans and a time for recognizing their central role in U.S. history. Since 1976, every U.S. president has officially designated the month of February as Black History Month. Black History Month was created to focus attention on the contributions of African Americans to the United States. It honors all Black people from all periods of U.S. history.
This report provides details of the request and its alignment with community engagement and celebration of the community’s residents.
B-19
FINANCIAL IMPACT:
The applicable costs associated with the rental of PACC, with the space as requested, are summarized in Table 1, which would be applicable for this rental. Costs are derived from the City of Madera Master Fee Schedule.
Table 1: Estimated Financial Impact Without Fee Waiver
Administrative Fee $25
Deposit $200
Gym Rental at Pan-American $660
Early Access Fee $50
Total $935
The total applicable cost for the PACC rental would be $935.
ALTERNATIVES:
The Council may elect to reject the fee waiver and require the Black Saints United to remit any associated fees if they wish to rent PACC for the Black History Month Celebration event.
ATTACHMENTS:
1. Resolution – Waiving the rental fees of the Pan American Community Center on February 16, 2025, related to a Black History Month Celebration hosted by the Black Saints United, at an anticipated fee rental of $935
ATTACHMENT 1
Resolution – Waiving the rental fees of the Pan American Community Center on February 16, 2025, related to a Black History Month Celebration hosted by the Black Saints United, at an anticipated fee rental of $935
RESOLUTION NO. 25-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA,
CALIFORNIA WAIVING THE RENTAL FEES OF THE PAN AMERICAN
COMMUNITY CENTER ON FEBRUARY 16, 2025, RELATED TO A BLACK
HISTORY MONTH CELEBRATION HOSTED BY THE BLACK SAINTS UNITED, AT AN ANTICIPATED FEE RENTAL OF $935
WHEREAS, the City has received a request for waiving of fees for the rental of the Pan American Community Center (PACC); and
WHEREAS, the request is from the Black Saints United; and WHEREAS, the Black Saints United are looking to host a Black History Month Celebration event; and
WHEREAS, the request is for rental utilization on Sunday, February 16, 2025, from 8:00 am – 6:30 pm, including setup and cleanup time; and
WHEREAS, the estimated fees for the request are calculated based on the City of Madera Master Fee Schedule; and
WHEREAS, the fees for the event are calculated at $935; and WHEREAS, the Black Saints United are still subject to providing insurance documentation for City facility rentals that meet City requirements.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF MADERA hereby resolves, finds, determines and orders as follows:
1. The foregoing recitals are true and correct and incorporated herein by reference.
2. The Council finds that the waiver of fees as set forth in this resolution serves a valid public purpose in that the Black Saints United is a local community organization, and this event provides the opportunity for the community to celebrate Black History Month, created to focus attention on the contributions of African Americans to the United States.
3. The City Council does hereby waive the City fees for Rental Fees of the Pan American Community Center on the date and time identified, subject to confirmation of insurance.
4. This resolution is effective immediately upon adoption. * * * * * *
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
_________________________________ Agenda Number: ___________ Michael Lima, Director of Financial Services
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Appointment to the Transit Advisory Board.
RECOMMENDATION:
Adopt a resolution approving the appointment of Andrew Albonico to the Transit Advisory Board SUMMARY:
The Transit Advisory Board (TAB) is comprised of seven (7) members. Each member of the City Council makes a nomination to be considered for appointment by the Mayor and the Mayor has one direct appointment. Appointments are subject to approval of the City Council by resolution.
At this time, Mayor Gallegos has appointed Andrew Albonico to the TAB. The requested action is to approve the appointment of Andrew Albonico.
DISCUSSION:
The TAB serves in an advisory capacity to transit staff and City Council on matters pertaining to Madera Metro’s public transportation services and operations. Nominations of individuals to serve as TAB Members may be made by all seven (7) members of the City Council. The Mayor then makes appointments from those nominated. The Mayor also makes a direct appointment to the TAB. The Mayor’s appointment must be approved by the City Council as a whole, with the resolution of appointment approved by at least four (4) members of the City Council. Each TAB member will serve a term equal to the term of the councilmember who initially submitted their nomination.
TAB members are noted below in Table 1, with the individual considered for approval of appointment indicated in bold text.
B-20
Table 1. Transit Advisory Board Membership
Member Nominating Councilmember City Council District
Andrew Albonico Mayor Gallegos At-large Mayor
VACANT Councilmember Zacharia
(previously appointed by then-District 1
Councilwoman Gallegos)
District 1
VACANT Mayor Pro Tem Rodriguez District 2
Marie Luna Councilmember Montes District 3
Patricia Carreon Councilwoman Evans District 4
Otilia Morales Councilwoman Mejia District 5
VACANT Councilmember Villegas District 6
Mr. Albonico has served as the District 1 nominee since September 2020. He will replace Cynthia Ortegon who was appointed by former Mayor Santos. The Mayor is seeking approval from the City Council of the appointment of Mr. Albonico. Per the Municipal Code, this appointment will be for a term matching the Mayor, or until the replacement is appointed. The Mayor’s Council term ends on December 6, 2028.
FINANCIAL IMPACT:
There is no anticipated financial impact.
ALTERNATIVES:
Council may direct staff to seek additional applications to serve on the Transit Advisory Board.
ATTACHMENTS:
1. Resolution
2. Volunteer application for Andrew Albonico
Resolution No. _______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA
APPROVING THE APPOINTMENT OF ANDREW ALBONICO TO THE CITY OF
MADERA TRANSIT ADVISORY BOARD
WHEREAS, the City of Madera has established a Transit Advisory Board (TAB) to serve in a volunteer capacity to fulfill the duties of the TAB as provided in their adopted bylaws; and WHEREAS, TAB is comprised of seven (7) citizens nominated by members of the City Council and appointed by the Mayor, subject to confirmation by the Council as a whole; and WHEREAS, Mayor Gallegos has nominated Andrew Albonico to be considered for appointment to TAB for a term concluding December 6, 2028 or as otherwise provided in the Madera Municipal Code; and
WHEREAS, Mayor Gallegos has considered the above-named nominated individual and has appointed Andrew Albonico; and
WHEREAS, Andrew Albonico has expressed his desire to serve on TAB.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF MADERA hereby resolves, finds, and orders as follows:
1. The above recitals are true and correct.
2. The Council approves the appointment of Andrew Albonico to TAB for a term ending December 6, 2028, unless otherwise indicated by the Madera Municipal Code.
3. This resolution is effective immediately upon adoption. ********************
___________________________________
ƌŶŽůĚŽ ZŽĚƌŝŐƵĞnj͕ ŝƚLJ DĂŶĂŐĞƌ
REPORT TO CITY COUNCIL
Council Meeting of: February 5, 2025
Agenda Number:
SUBJECT:
Appointment to the Community Development Block Grant Commission RECOMMENDATION:
Adopt a Resolution appointing Cesar Villegas to the Block Grant Commission (BGC) SUMMARY:
The Community Development Block Grant (CDBG), Block Grant Commission (BGC) was established on March 18, 2009 to serve in an advisory capacity to staff and City Council (Council) on matters related to CDBG funding. The BGC consists of seven members, with each member of the Council making a nomination to be considered for appointment by the Mayor, subject to approval of the Council by resolution. At this time, Councilwoman Evans has nominated Cesar Villegas to serve on the BGC. The Mayor has considered the nomination and has approved the appointment of Mr.
Villegas. The requested action is a resolution of the City Council to approve the appointment of Mr.
Villegas to the BGC.
DISCUSSION:
The City is a CDBG entitlement jurisdiction which receives an annual funding allocation with the submission of an Annual Action Plan. As an advisory Commission, duties of the BGC include:
1. Evaluation of annual CDBG request for funding applications.
2. Consideration of the U.S Department of Housing and Urban Development (HUD) priorities and the Council-approved five-year City CDBG Consolidated Plan.
3. Provide Council funding recommendations.
4. Review and recommend approval of CDBG reports including the Consolidated Plan, Annual Action Plans, and any substantial amendments.
5. Promote public participation in the CDBG planning and award process.
Approved by:
___________________________________
DŝĐhael Lima, Director of Financial Services
ͲϮϭ
Table 1. BGC Membership
Applicant Nominating Councilmember City Council District Gabriela GonzalesGutierrezFormer Mayor Garcia At-large Mayor Candace Talley Former Councilwoman Gallegos District 1
Alyssia Arredondo Mayor Pro Tem Rodriguez District 2
Stephanie Nathan Councilmember Montes District 3
Cesar Villegas Councilwoman Evans District 4
Olga P. Garcia Former Council Member Garcia District 5
Dulce Arredondo Councilmember Villegas District 6
At this time, the Mayor has considered the nomination of Cesar Villegas by Councilwoman Evans and is seeking approval from the City Council of the appointment to the BGC. Per the Municipal Code, appointments will be for a term matching the nominating Council person, or until a replacement is appointed. The Council term for Councilwoman Evans ends on December 6, 2028. The Municipal Code also provides that the resolution of appointment must receive at least four (4) affirmative votes to pass.
FINANCIAL IMPACT:
There is no anticipated financial impact.
ALTERNATIVES:
Council may direct staff to solicit additional volunteer applications for commission, board and committee service.
ATTATCHMENTS:
1. Resolution
2. Volunteer application for Cesar Villegas.
BGC members are noted ĂďŽǀĞ in Table 1, with the individuals considered for approval of appointment indicated in bold text.
Resolution No. _______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA APPROVING
THE APPOINTMENT OF CESAR VILLEGAS TO THE CITY OF MADERA BLOCK
GRANT COMMISSION
WHEREAS, the City of Madera has established a Block Grant Commission (BGC) to serve in a volunteer capacity to fulfill the duties of the Block Grant as provided in their adopted bylaws; and WHEREAS, BGC is comprised of seven citizens nominated by members of the City Council and appointed by the Mayor, subject to confirmation by the Council as a whole; and WHEREAS, Councilwoman Evans has nominated Cesar Villegas to be considered for appointment to the BGC for a term concluding December 6, 2028 or as otherwise provided in the Madera Municipal Code; and
WHEREAS, Mayor Gallegos has considered the above-named nominated individuals and has appointed Cesar Villegas; and
WHEREAS, Cesar Villegas has expressed his desire to serve on the BGC.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF MADERA hereby resolves, finds, and orders as follows:
1. The above recitals are true and correct.
2. The Council approves the appointment of Cesar Villegas to the BGC for a term ending December 6, 2028, unless otherwise indicated by the Madera Municipal Code.
3. This resolution is effective immediately upon adoption. ********************
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
Agenda Number: ___________
________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Ensuring the City of Madera as a refuge and welcoming City for all RECOMMENDATION:
This report is submitted for informational purposes. Staff will receive comments and direction as may be offered from the City Council (Council)
SUMMARY:
During the January 15, 2025, Council meeting, Council directed staff to agendize for discussion an item regarding the City’s status with regard to refugees and immigrants and uses of City resources.
The City has previously adopted a resolution in support of the Dream Act and DACA. Additionally, the State of California has passed several laws, including those limiting cooperation with federal immigration enforcement, particularly in cases where individuals are not accused of serious crimes. However, the recently-elected President has announced plans to deploy Immigration and Customs Enforcement (ICE), a federal agency under the Department of Homeland Security (DHS), to deport individuals who entered the country without the benefit of proper documentation. The President has also recently signed an executive order entitled “American People Against Invasion.” Given the City's diverse population, including many ethnic minorities and foreign-born residents, these policies have contributed to heightened concerns within the community.
It is important to note that federal immigration enforcement can legally operate within the State of California and the City’s jurisdiction, and State and local laws do not shield undocumented residents from deportation by federal authorities. Rather, enactments by cities primarily set guidelines on how local resources, including law enforcement, engage with federal immigration authorities.
C-1
DISCUSSION:
Policies vary by jurisdiction but often include restricting local law enforcement from inquiring about immigration status or declining to hold individuals solely for federal immigration authorities without a judicial warrant. State and City policies can foster trust between immigrant communities and local government, ensuring that all residents feel safe when reporting crimes or accessing public services.
Relationship between the City and ICE
ICE operates independently from the City’s Police Department. While ICE may conduct enforcement activities in the City, they sometimes (italicized for emphasis) notify the City about their presence; however, the City does not have resources to collaborate or share information with ICE unless there is a direct and immediate public safety threat. It is also important to recognize that ICE has the authority to operate anywhere in the United States, including Madera.
Potential Implications
As with any transition, the recent Congressional and Presidential election has created additional uncertainty as to whether the newly elected officials will pass legislation to withhold such funding. For example, after the prior Council meeting, the President signed an executive order entitled “American People Against Invasion.” This executive order specifically directs that “sanctuary” jurisdictions that interfere with the lawful exercise of Federal law enforcement operations do not receive access to federal funds. Further, the order provides that the Attorney General and the Secretary of Homeland Security shall take criminal or civil enforcement action as warranted against jurisdictions who interfere with the enforcement of federal law In other words, if the City declaresitself a “sanctuary” jurisdiction at some future date, it could potentially (italicized for emphasis) jeopardize federal funding used for City roads, public programs, Police services, and other items.
Alternative Options for Consideration
The Council does have options. The City can still rely on existing State law, including Senate Bill 54, which limits enforcement actions. The City could also pass a resolution urging the support, or withdrawal, of certain federal laws. For example, the City could:
▪ Re-affirm its support of the Dream Act and DACA,
▪ Urge that the recent executive order be rescinded; and/or ▪ Call for a moratorium on federal immigration raids and the adoption of fair, comprehensive, and humane federal immigration reforms.
Any of these actions could also highlight how such enforcement undermines the trust and cooperation with immigrant communities, essential elements of community-oriented policing.
Another option for the City is to adopt a Resolution expressing itself as a Welcoming City for refugees and immigrants, and declaring itself as a place of trust and dignity for all people. This could be in addition to the existing State laws that address immigration issues and could address the importance of security and safety for all.
Some cities have declared themselves as “sanctuary” cities. These sorts of Resolutions typically have a policy statement against local enforcement of civil immigration laws except for permitting cooperation with federal agents in situations involving public and serious crimes.
Additionally, the City could also adopt a “combined” Resolution that includes any combination of these options.
FINANCIAL IMPACT:
The financial impact of preparing this report is nominal. However, depending on the direction provided by the Council, implementing new policies could have significant costs associated, including potential legal challenges, operational costs to implement new policies, or loss of federal funding if the federal government establishes that the City’s action make it a “sanctuary” jurisdiction. There could also be individual litigation costs for City Councilmembers or City personnel in the event that criminal charges are brought against them (public agencies have restrictions on paying for criminal defense costs).
ATTACHMENTS:
No attachments.
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
_________________________________ Agenda Number: __________ Keith Helmuth, City Engineer
Arnoldo Rodriguez, City Manager
SUBJECT:
Sidewalk Improvements at Various Locations City Project No. R-94 Bid Package 3 Phase 2 AHSC Agreement No. 19-AHSC-12761
RECOMMENDATION:
Adopt a Resolution approving the contract award for Sidewalk Improvements at Various Locations City Project No. R-94 Bid Package 3 Phase 2 Affordable Housing and Sustainable Communities Program (AHSC), Agreement No. 19-AHSC-12761 in the amount of $2,056,522.00 to Witbro Inc dba Seal Rite Paving & Grading.
SUMMARY:
On January 23, 2025, the City received four bids for the Sidewalk Improvements at Various Locations City Project No. R-94 Bid Package 3 Phase 2 AHSC Agreement No. 19-AHSC-12761 (Project). The Project is funded with AHSC Grant funds and local transportation funds. Witbro Inc dba Seal Rite Paving & Grading, submitted the lowest responsive and responsible bid.
BACKGROUND:
As part of the Affordable Housing and Sustainable Communities Program (AHSC), the City was awarded funds for multimodal improvements associated with the Veteran’s Housing Project (now called Esperanza Village). The AHSC funding the City was awarded is split into three different projects.
Bid Package 1 – RRFB and Safety Improvements at George Washington Elementary School. This project is complete.
Bid Package 2 – Bike Lane Construction Plan for Various Streets. This project is currently advertising and should be complete by June 2025.
Bid Package 3 – Sidewalk Installation. Bid Package 3 is split into two phases due to some Approved by:
_________________________________
Keith Helmuth, City Engineer
D-1
of the work being done within the right-of-way (ROW) of Caltrans. That work is Phase 1.
Phase 2 of Bid Package 3 is proposed for award by Council tonight, February 5th, and is sidewalk installation not within Caltrans ROW. See Attachment 2 Project Maps for locations of sidewalk installation.
DISCUSSION:
The general scope of work consists of installation of missing sidewalk at various locations. The goal is to provide walkable transportation options within the designated benefit area of the Esperanza Village Housing Project located at 5th Street and C Street. Specifically, work at each location includes excavation of native soil, roadway excavation, demolition of concrete improvements, installation of curb ramps, curb and gutter, drive approaches, tree removal, fence relocation, and boxes to grade.
On December 23, 2024, the City released the project for public bidding on the PlanetBids web portal. Also, an Advertisement for Bids was duly published in the Madera Tribune on December 21st and December 28th of 2024.
On January 23, 2025, four bids were received. The bids were checked for accuracy against bidding requirements, validity of licenses, and bid security. The bids received are summarized in Table 1.
Table 1: Bid Overview
Bidder Total Base Bid
1. Witbro Inc dba Seal Rite Paving & Grading $2,056,522.00
2. Clean Cut Landscape, Inc $2,474,338.00
3. American Paving Co. $3,702,078.90
4. Cal Valley Construction $3,935,296.00
Engineer’s Opinion of Cost $2,256,162.80
Witbro Inc dba Seal Rite Paving & Grading submitted the lowest responsive, and responsible bid that meets the contract requirements.
Staff recommends award of the project to Witbro Inc dba Seal Rite Paving & Grading in the amount of $2,056,522.00 and include a 15 percent of contract amount for allowable contingencies as approved by the City Engineer.
FINANCIAL IMPACT:
There is no fiscal impact on the City’s General Fund. The Project is programmed in the CIP FY 24/25 budget for AHSC Grant funding and balance from LTF funds.
ALTERNATIVES:
The alternative to awarding the project is to reject all bids. Rebidding the project could result in higher bids and would result in delays in the sidewalk project. At present, there is a requirement of the AHSC funding agreement that the project be completed by June 2025. Rebidding could jeopardize the AHSC funds.
ATTACHMENTS:
1. Resolution Contract Award
a. Exhibit A - Contract
2. Project Maps
Attachment 1
Resolution
RESOLUTION NO. 25-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA,
CALIFORNIA APPROVING THE CONTRACT AWARD FOR SIDEWALK
IMPROVEMENTS AT VARIOUS LOCATIONS CITY PROJECT NO. R-94 BID PACKAGE 3 PHASE 2 AHSC AGREEMENT NO. 19-AHSC-12761 IN THE AMOUNT OF $2,056,522.00 AND AUTHORIZING CONSTRUCTION
CONTINGENCIES RELATING TO THE CONTRACT
WHEREAS, on December 23, 2024, the City of Madera (City) Engineering Department advertised a solicitation for construction bids for Sidewalk Improvements at Various Locations, City Project No. R-94 Bid Package 3 Phase 2 AHSC Agreement No. 19-AHSC-12761 hereinafter referred to as “the Project”; and
WHEREAS, four sealed bids were received on January 23, 2025, and opened by the City Engineer; and
WHEREAS, Witbro Inc dba Seal Rite Paving & Grading was selected as the lowest responsive and responsible bidder; and
WHEREAS, funding for the Project is programmed in the Capital Improvement Projects Budget for Fiscal Year 2024/25 under CIP Project R-94.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA HEREBY finds, orders and resolves as follows:
1. The above recitals are true and correct.
2. The City Council (Council) has reviewed and considered all of the information presented including the report to Council from the Engineering Department.
3. The City finds that Witbro Inc dba Seal Rite Paving & Grading is the lowest responsible and responsive bidder.
4. The contract for the Project in the amount of $2,056,522.00 to Witbro Inc dba Seal Rite Paving & Grading, a copy of which is attached hereto as Exhibit A and referred to for particulars, is approved. The City Manager is further authorized to make any nonmaterial, technical, and clerical edits and corrections to the agreement, including performance and payment bonds completed after the award, subject to approval to form by City Attorney.
5. Council authorizes Construction Contingencies of up to 15 percent as approved by the City Engineer.
6. This Resolution is effective immediately upon adoption. *******
Exhibit A
Contract Agreement
AGREEMENT
THIS AGREEMENT, made this 5th day of February, 2025, between the City of Madera, hereinafter called “OWNER”, and Witbro Inc dba Seal Rite Paving & Grading, doing business as (an individual), or (a partnership), or (a corporation), hereinafter called “CONTRACTOR”.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The CONTRACTOR shall commence and complete all WORK required for the “Sidewalk Improvements at Various Locations City Project No. R-94 Bid Package 3 Phase 2 AHSC Agreement No. 19-AHSC-12761”
2. The CONTRACTOR shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the WORK described herein.
3. The CONTRACTOR shall commence the WORK required by the CONTRACT DOCUMENTS within 10 calendar days after the date of the NOTICE TO PROCEED and will complete the same within the time period set forth in the CONTRACT DOCUMENTS. The CONTRACTOR shall submit a Payment Bond and Performance Bond in the amount of
$2,056,522.00, each and Insurance Certificates as specified in the CONTRACT DOCUMENTS prior to commencing any WORK.
4. The CONTRACTOR agrees to perform all of the WORK described in the DOCUMENTS for the unit and lump sum prices set forth in the Bid Schedule.
5. The term “CONTRACT DOCUMENTS” means and includes the following:
(A) Advertisement for Bids
(B) Information for Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Insurance Requirements for Contractors
(I) Section 1, General Conditions
(J) Section 2, Special Conditions
(K) Section 3, City of Madera Standard Specifications and Drawings (L) Section 4, Bid Items
(M) Section 5, Technical Specifications
(N) State Standard Plans and Specifications
No Addenda’s Issued
6. In the event the CONTRACTOR does not complete the WORK within the time limit specified herein or within such further time as authorized, the CONTRACTOR shall pay to the OWNER liquidated damages in the amount of Five Thousand Two Hundred Dollars ($5,200.00) per day for each and every calendar day delay in finishing the WORK beyond the completion date so specified.
7. The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. In no event shall total compensation exceed $2,056,522.00 except as may otherwise be authorized in writing per Section
16. For any moneys earned by the CONTRACTOR and withheld by the OWNER to ensure the performance of the Contract, the CONTRACTOR may, at his request and expense, substitute securities equivalent to the amount withheld in the form and manner and subject to the conditions provided in Division 2, Part 5, Section 22300 of the Public Contract Code of the State of California.
8. In the event of a dispute between the OWNER and the CONTRACTOR as to an interpretation of any of the specifications or as to the quality or sufficiency of material or workmanship, the decision of the OWNER shall for the time being prevail and the CONTRACTOR, without delaying the job, shall proceed as directed by the OWNER without prejudice to a final determination by negotiation, arbitration by mutual consent or litigation, and should the CONTRACTOR be finally determined to be either wholly or partially correct, the OWNER shall reimburse him for any added costs he may have incurred by reason of work done or material supplied beyond the terms of the contract as a result of complying with the OWNER’S directions as aforesaid. In the event the CONTRACTOR shall neglect to prosecute the work properly or fail to perform any provisions of the CONTRACT, the OWNER, after three days written notice to the CONTRACTOR, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due to the CONTRACTOR, subject to final settlement between the parties as in this paragraph herein above provided.
8A. CLAIMS RESOLUTION PROCESS FOR DISPUTES.
It is the intent of this Contract that disputes regarding the Contract be resolved promptly and fairly between the Contractor and the Owner. However, it is recognized that some disputes will require detailed investigation and review by one or both parties before a determination and resolution can be reached. For the protection of the rights of both the Contractor and the Owner, the following provisions are provided for the resolution of disputes which cannot be resolved by the Owner and the Contractor within three business days after either party gives verbal notice of dispute or potential dispute to the other's attention and prior to the commencement of such work.
The following provisions are intended by Contractor and Owner to comply with Public Contract Code Sections 9204 and 20104 et. seq.
A. Claims:
The term “claim” refers to a separate demand by Contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
1. A time extension, including, without limitation, for relief from damages or penalties for delay assessed by Owner under this Contract.
2. Payment by the Owner of money or damages arising from work done by, or on behalf of, the Contractor pursuant to the Contract and payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled.
3. Payment of an amount that is disputed by the Owner.
B. The Claim Must Be Timely and in Writing:
For all claims the claim must be in writing and include the documents necessary to substantiate the claim. A notice of potential claim must be filed within five (5) business days of Contractor’s completion of work that is a potential claim. Notice of an actual claim must be filed on or before the date of final payment.
C. Receipt of Claim by Owner:
Upon receipt of a claim pursuant to this section, the Owner will conduct a reasonable review of the claim and, within a period not to exceed 45 days from the date of receipt, will provide the Contractor with a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, Owner and Contractor may, by mutual agreement, extend the time period provided in this section.
The Contractor shall furnish reasonable documentation to support the claim. If additional information is thereafter required, it shall be requested and provided upon mutual agreement by the Owner and the Contractor. The District's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation.
D. City Council Approval:
If the Owner needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the Owner shall have up to three days following the next duly publicly noticed regular meeting of the City Council after the 45-day period or extension expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
E. Payment of Claim:
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the Owner issues its written statement. If the Owner fails to issue a written statement, paragraph F below shall apply.
F. Meet and Confer:
If the Contractor disputes the Owner’s written response, or if the Owner fails to respond to a claim issued pursuant to this section within the time prescribed, the Contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the Owner shall schedule a meet and confer conference within 30 days for settlement of the dispute.
Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the Owner shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the Owner issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the Owner and the Contractor sharing the associated costs equally. The Owner and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
Under this Contract, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.
Any mediation utilized shall conform to the timeframes in this section.
Unless otherwise agreed to by the Owner and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced.
If mediation as set forth above does not resolve the parties’ dispute, the parties will proceed to arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program.
G. Filing a Government Code Written Claim Notice:
Following the meet and confer conference, if the claim or any portion remains in dispute, the Contractor may file a claim under the Torts Claims Act as provided in Chapter 1 (commencing with Section 900) and Chapter 2 commencing with Section 910) of Part 3 of Division
3.6 of Title 1 of the Government Code Section 900.
H. Owner’s Failure to Respond to Claim:
Failure by the Owner to respond to a claim from Contractor within the time periods described above or to otherwise meet the time requirements set forth above shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the Owner’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the Contractor.
I. Interest:
Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
J. Subcontractor Claims:
If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against Owner because privity of contract does not exist, the Contractor may present to the Owner a claim on behalf of a subcontractor or lower tier subcontractor. For purposes of this paragraph, the term “subcontractor’ means any type of subcontractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with the Contractor or is a lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the Contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the Owner shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the Contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the Owner and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
K. Filing of Action on Unresolved Claims:
The parties shall follow the procedures set forth in Public Contracts Code Section 20104.4 if an action is filed to resolve claims under the foregoing provisions. Any action shall be filed in Madera County.
9. Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical conditions, marital status, or sex of such persons except as provided in Section 12940 of the Government Code, and every contractor for public works violating this section is subject to all the penalties imposed for by violation of this chapter”.
10. In accordance with the provisions of Article 5, Chapter l, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part l, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, the CONTRACTOR is required to secure the payment of compensation to his employees and shall for that purpose obtain and keep in effect adequate Worker’s Compensation Insurance.
The undersigned CONTRACTOR is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against Liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the WORK of this Agreement.
11. The CONTRACTOR shall comply with Part 7, Chapter l, Article 2, Section 1775 of the Labor Code of the State of California. The CONTRACTOR shall, as a penalty to the OWNER, forfeit fifty dollars ($50.00) for each calendar day, or portion thereof, for each workman paid less than the prevailing rates for such work or craft in which such workman is employed for any public work done under the Contract by him or by any SUBCONTRACTOR under him. The difference between such prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than a prevailing wage rate, shall be paid to each workman by the CONTRACTOR.
12. The CONTRACTOR shall comply with Part 7, Chapter l, Article 2, Section 1776 of the Labor Code of the State of California. The CONTRACTOR shall keep and require that all SUBCONTRACTORS keep accurate payroll records showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice worker or other employee employed by him in connection with public work. Such payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of the CONTRACTOR by the OWNER, its officers and agents and to the representatives of the Division of Labor Law Enforcement of the State Department of Industrial Relations. In the event of non-compliance with the requirements of Section 1776, the CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects the CONTRACTOR must comply. Should non-compliance still be evident after the ten (10) day period, the CONTRACTOR shall, as a penalty to the OWNER forfeit twenty-five dollars ($25.00) for each calendar day, or portion thereof, for each worker until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due.
13. Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the CONTRACTOR or any SUBCONTRACTOR under him. It is the CONTRACTOR’S responsibility to ensure compliance by both itself and all SUBCONTRACTORS.
Section 1777.5 provides, in part, as follows:
The CONTRACTOR or SUBCONTRACTOR, if he is covered by this section, upon the issuance of the approval certificate, or if he has been previously approved in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeyman stipulated in the apprenticeship standards. Upon proper showing by the CONTRACTOR that he employs apprentices in the craft or trade in the State on all of his/her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by a journeyman, or in the land surveyor classification, one apprentice for each five journeyman, the Division of Apprenticeship Standards may grant a certification exempting the CONTRACTOR from the one (1) to five (5) hourly ratio as set forth in this section. This section shall not apply to contracts of general CONTRACTORS or to contracts of specialty contractors not bidding for work through a general or prime CONTRACTOR, when the contracts of general CONTRACTORS, or those specialty CONTRACTORS involve less than thirty thousand dollars ($30,000).
Any work performed by a journeyman in excess of eight hours per day or forty (40) hours per week shall not be used to calculate the hourly ratio required by this section.
Apprenticeable craft or trade, as used in this section, shall mean a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the Apprenticeship Council. The joint apprenticeship committee shall have the discretion to grant a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting a CONTRACTOR from the 1 to 5 ratio set forth in this section when it finds that any one of the following conditions is met:
(a) In the event unemployment for the previous three-month period in such area exceeds an average of 15 percent, or
(b) In the event the number of apprentices in training in such area exceeds a ratio of 1 to 5, or (c) If there is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either (1) on a statewide basis, or (2) on a local basis, or
(d) If assignment of an apprentice to any work performed under a public works contract would create a condition which should jeopardize his life or the life, safety, or property of fellow employees, or the public at large or if the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
When such exemptions are granted to an organization which represents CONTRACTORS in a specific trade from the 1 to 5 ratio on a local or statewide basis the member CONTRACTORS will not be required to submit individual applications for approval to local joint apprenticeship committees, provided they are already covered by the local apprenticeship standards.
The CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in apprenticeable trade on such contracts and if other CONTRACTORS on the public work site are making such contributions. The CONTRACTOR, and any SUBCONTRACTOR under him, shall comply with the requirements of Sections 1777.5 and 1777.6 of the Labor Code in the employment of apprentices.
Information relative to number of apprentices, identifications, wages, hours of employment and standards of working conditions shall be obtained from the Division of Apprenticeship Standards.
Consult the white pages of your telephone directory under California, State of, Industrial Relations, Apprenticeship Standards, for the telephone number and address of the nearest office. Willful failure by the CONTRACTOR to comply with the provisions of Sections 1777.5 will subject the CONTRACTOR to the penalties set forth in Section 1777.7 of the Labor Code.
14. Pursuant to California Labor Code Section 1813, eight hours in any one calendar day and forty (40) hours in any calendar week shall be the maximum hours any workman is required or permitted to work, except in cases of extraordinary emergency caused by fires, flood, or danger to life and property. The CONTRACTOR doing the work, or his duly authorized agent, shall file with OWNER a report, verified by his oath, setting forth the nature of the said emergency, which report shall contain the name of said worker and the hours worked by him on the said day, and the CONTRACTOR and each SUBCONTRACTOR shall also keep an accurate record showing the names and actual hours worked of all workers employed by him in connection with the work contemplated by this Agreement, which record shall be open at all reasonable hours to the inspection of the OWNER, or its officer or agents and to the Chief of all Division of Labor Statistics and Law Enforcement of the Department of Industrial Relations, his deputies or agents; and it is hereby further agreed that said CONTRACTOR shall forfeit as a penalty to the OWNER the sum of Twenty-Five Dollars ($25.00) for each laborer, workman or any SUBCONTRACTOR under him for each calendar day during which such laborer, workman or mechanic is required or permitted to labor more than eight (8) hours in violation of this stipulation.
Overtime and shift work may be established as a regular procedure by the CONTRACTOR with reasonable notice and written permission of the OWNER. No work other than overtime and shift work established as a regular procedure shall be performed between the hours of 6:00 P.M. and 7:00 A.M. nor on Saturdays, Sundays or holidays except such work as is necessary for the proper care and protection of the work already performed or in case of an emergency.
CONTRACTOR agrees to pay the costs of overtime inspection except those occurring as a result of overtime and shift work established as a regular procedure. Overtime inspection shall include inspection required during holidays, Saturdays, Sundays and weekdays. Costs of overtime inspection will cover engineering, inspection, general supervision and overhead expenses which are directly chargeable to the overtime work. CONTRACTOR agrees that OWNER shall deduct such charges from payments due the CONTRACTOR.
15. The CONTRACTOR shall comply with Division 2, Chapter 4, Part 1 of the Public Contract Code relating to subletting and subcontracting, specifically included but not limited to Sections 4104, 4106, and 4110, which by this reference are incorporated into this Agreement as though fully set forth herein.
16. The CONTRACTOR and the OWNER agree that changes in this Agreement or in the work to be done under this Agreement shall become effective only when written in the form of a supplemental agreement or change order and approved and signed by the OWNER and the CONTRACTOR. It is specifically agreed that the OWNER shall have the right to request any alterations, deviations, reductions or additions to the contract or the plans and specifications or any of them, and the amount of the cost thereof shall be added to or deducted from the amount of the contract price aforesaid by fair and reasonable valuations thereof.
This contract shall be held to be completed when the work is finished in accordance with the original plans and specifications as amended by such changes. No such change or modification shall release or exonerate any surety upon any guaranty or bond given in connection with this contract.
17. Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees, and volunteers from and against all liability, loss, damage, expense, and cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's negligence, recklessness, or willful misconduct in the performance of work hereunder, or its failure to comply with any of its obligations contained in this AGREEMENT, except such loss or damage caused by the sole active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation, reasonable legal counsel fees, expert fees, and all other costs and fees of litigation.
The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless, or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
Contractor obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.
Contractor agrees to obtain or cause to be obtained executed defense and indemnity agreements with provisions identical to those set forth in this Section from each and every Subcontractor and Subconsultant, of every Tier. In the event the Contractor fails to do so, Contractor agrees to be fully responsible to provide such defense and indemnification according to the terms of this Section.
18. Contractor must comply with the insurance requirements as described in the section “INSURANCE REQUIREMENTS FOR CONTRACTOR”, pages 39-40 of the Contract Documents.
19. Amendments- Any changes to this Agreement requested by either City or Witbro Inc dba Seal Rite Paving & Grading may only be effected if mutually agreed upon in writing by duly authorized representatives of the parties hereto. This Agreement shall not be modified or amended or any rights of a party to it waived except by such writing.
20. Termination.
A. This Agreement may be terminated at any time by either party upon fifteen (15) calendar days written notice. In the event the Agreement is terminated by either party, Witbro Inc dba Seal Rite Paving & Grading shall be compensated for services performed to the date of termination based upon the compensation rates and subject to the maximum amounts payable agreed to together with such additional services performed after termination which are authorized in writing by the City representative to wind up the work performed to date of termination.
B. City may immediately suspend or terminate this Agreement in whole or in part by written notice where, if in the determination of City, there is:
1. An illegal use of funds by Witbro Inc dba Seal Rite Paving & Grading;
2. A failure by Witbro Inc dba Seal Rite Paving & Grading to comply with any material term of this Agreement;
3. A substantially incorrect or incomplete report submitted by Witbro Inc dba Seal Rite Paving & Grading to City.
In no event shall any payment by City or acceptance by Witbro Inc dba Seal Rite Paving & Grading constitute a waiver by such party of any breach of this Agreement or any default which may then exist on the part of either party. Neither shall such payment impair or prejudice any remedy available to either party with respect to such breach or default. City shall have the right to demand of Witbro Inc dba Seal Rite Paving & Grading the repayment to City of any funds disbursed to Witbro Inc dba Seal Rite Paving & Grading under this Agreement which, as determined by the appropriate court or arbitrator, were not expended in accordance with the terms of this Agreement.
Notice of termination shall be mailed to the City:
City of Madera
Engineering Department
428 E. Yosemite Avenue
Madera, Ca 93637
To the Contractor Witbro Inc dba Seal Rite Paving & Grading Notices. All notices and communications from the Witbro Inc dba Seal Rite Paving & Grading shall be to City's designated Project Manager or Principal-In-Charge. Verbal communications shall be confirmed in writing. All written notices shall be provided and addressed as soon as possible, but not later than thirty (30) days after termination.
21. Compliance With Laws- City shall comply with all Federal, State and local laws, ordinances, regulations and provisions applicable in the performance of City’s services.
Wherever reference is made in this Agreement to standards or codes in accordance with which work is to be performed or tested, the edition or revision of the standards or codes current on the effective date of this Agreement shall apply, unless otherwise expressly stated.
22. Attorneys’ Fees/Venue- In the event that any action is brought to enforce the terms of this Agreement, the party found by the court to be in default agrees to pay reasonable attorneys’ fees to the successful party in an amount to be fixed by the Court. The venue for any claim being brought for breach of this Agreement shall be in Madera County or as appropriate in the U.S. District Court for the Eastern District of California, located in the City of Madera.
23. Governing Law- The laws of the State of California shall govern the rights and obligations of the parties under the Agreement, including the interpretation of the Agreement. If any part of the Agreement is adjudged to be invalid or unenforceable, such invalidity shall not affect the full force and effect of the remainder of the Agreement.
24. City’s Authority- Each individual executing or attesting to this Agreement on behalf of the City hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with a duly adopted resolution of the corporation’s articles of incorporation or charter and bylaws; (ii) that this Agreement is binding upon such corporation; and (iii) that Contractor is a duly organized and legally existing municipal corporation in good standing in the State of California.
25. Contractor’s Legal Authority - Each individual executing or attesting this Agreement on behalf of Witbro Inc dba Seal Rite Paving & Grading hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with such corporation’s articles of incorporation or charter and by-laws; (ii) that this Agreement is binding upon such corporation; and (iii) that Witbro Inc dba Seal Rite Paving & Grading is a duly organized and legally existing corporation in good standing in the State of California.
26. Remedies for Default. Failure by a party to perform any term, condition or covenant required of the party under this Agreement shall constitute a “default” of the offending party under this Agreement. In the event that a default remains uncured for more than ten (10) days following receipt of written notice of default from the other party, a "breach" shall be deemed to have occurred. Any failure or delay by a party in asserting any of its rights and remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default.
27. Independent Contractor. In performance of the work, duties, and obligations assumed by the Contractor under this Agreement, it is mutually understood and agreed that the City, including any and all of City’s officers, agents and employees will, at all times, be acting and performing as an independent contractor, and shall act in an independent capacity and not as an officer, agent, servant, employee, joint venturer, partner, or associate of City. Furthermore, City shall have no right to control or supervise or direct the manner or method by which City shall perform its work and functions. The City shall comply with all applicable provisions of law and the rules and regulations, if any, of governmental authorities having jurisdiction over the subject matter hereof.
Because of its status as an independent contractor, City shall have absolutely no right to employment rights and benefits available to City employees. City shall be solely liable and responsible for providing to, or on behalf of, its employees all legally required employee benefits. In addition, City shall be solely responsible and hold City harmless from all matters relating to payment of City’s employees, including compliance with Social Security, withholding and all other regulations governing such matters. It is acknowledged that during the term of this Agreement, City may be providing services to others unrelated to City or to this Agreement.
28.Sole Agreement- This instrument constitutes the sole and only Agreement between City and Witbro Inc dba Seal Rite Paving & Grading in connection to the Project and correctly sets forth the obligations of the City and Witbro Inc dba Seal Rite Paving & Grading to each other as of its date. Any Agreements or representations in connection with the Project, not expressly set forth in this instrument are null and void.
27. Assignment-Neither the Witbro Inc dba Seal Rite Paving & Grading nor City will assign its interest in this Agreement without the written consent of the other.
28. 28 This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
IN WITNESS WHEREOF the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in THREE copies, each of which shall be deemed an original on the date first above written.
City of Madera
Herein Called OWNER
By:
Cece Gallegos, Mayor
APPROVE AS TO FORM:
Shannon L. Chaffin, City Attorney
ATTEST:
Alicia Gonzales, City Clerk
BY: Witbro Inc dba Seal Rite Paving & Grading
Herein Called CONTRACTOR
BY:
Federal Tax I.D. No.
Contractor License Number
DIR Registration Number
NOTE: This Notary Acknowledgment on the following page is required for verification of Contractor’s signature.
Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
California Notary acknowledgement required to be attached.
Attachment 2
Project Maps
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
_________________________________ Agenda Number:
Keith Helmuth, City Engineer
Arnoldo Rodriguez, City Manager
SUBJECT:
Clinton Street Sewer and Water Main Project, City Project R-97 RECOMMENDATION:
Adopt Resolutions:
1. Approving the Contract Award for the Clinton Street Sewer and Water Main Project, City Project R-97, CDBG Block Grant B23MC060053 in the amount of $767,246.75 to United Pavement Maintenance Inc.
2. Approving a Budget Amendment to the Fiscal Year 2024/25 Capital Projects Budget to appropriate additional CDBG funds to the Project
SUMMARY:
On January 21, 2025, the City received seven bids in response to an Advertisement for Bids. Of the bids received, United Pavement Maintenance Inc. submitted the lowest responsive and responsible bid per the contract requirements. Funds for the Clinton Street Sewer and Water Main Project, City Project R-97 (Project) are programmed in the Capital Improvement Program (CIP) Budget Fiscal Year (FY) 2024/25.
BACKGROUND:
Deteriorating sewer and water pipeline segments on Clinton Street were identified from the 2021 Sewer and Water Condition Assessment as high likelihood of failure due to their age and condition. These pipelines were recommended for repair or replacement within the next five years. Given this street is slated for a pavement improvement project and new sidewalk, it is prudent to address the underground infrastructure needs prior to the street projects.
The sewer main segment being renovated is a 12-inch diameter pipeline. The interior of the pipe D-2
is being lined with a 12inch resin impregnated Cured in Place Pipe (CIPP) liner that will strengthen the pipe as well as increase its lifespan.
The water main segments being replaced are a combination of 8-inch and 10-inch diameter pipelines.
The Advertisement for Bids for the project was officially released on December 19, 2024 via the City’s PlanetBids public bidding system. The project was also advertised in the Madera Tribune on December 18, 2024, and again on December 28, 2024. The City received seven bids by the deadline of January 21, 2025. All bids were checked for accuracy against bidding requirements, validity of licenses, and bid security. Table 1 provides a summary of the bids received.
Table 1: Bid Overview
Bidder Bid
1. United Pavement Maintenance, Inc. $767,246.75
2. Rolfe Construction, Inc $883,087.00
3. West Valley Construction Company, Inc $887,894.00
4. Walsh Montgomery Construction, Inc $1,032,007.00
5. Fortis General Construction, Inc. $1,100,590.25
6. Mid Cal Pipeline and Utilities, Inc $1,152,550.00
7. JT2 Inc, dba Todd Companies $1,157,000.00
Engineer’s Opinion of Cost $941,797.06
FINANCIAL IMPACT:
There is no fiscal impact to the City’s General Fund. The funding for the project is programmed in the FY 2024/2025 Capital Projects Budget using Community Development Block Grant (CDBG) B23MC060053 and Enterprise Funds.
On January 15, 2025, Council adopted Resolution 25-11 approving an additional allocation of CDBG funds in the amount of $160,764 to the Project from the unobligated CDBG fund balance.
Funding from the Enterprise funds will be reduced by this amount. A budget amendment reflecting the additional CDBG funds is included in tonight’s action.
Table 2 below is the Project Construction Budget.
Table 2: Project Budget
Projected Costs Amount
Construction Budget – pending approval $ 767,246.75
Contingencies, 10% of Contract Amount $ 76,275.00
Construction Engineering, Inspection, and Testing $ 75,000.00 Total Costs $ 918,521.75
Table 3 below is the Funding Summary.
Table 3: Funding Overview
Funding Source Amount
CDBG Agreement Dated July 1, 2023 $ 617,500.00
Additional CDBG funding per Resolution 25-11 $ 160,764.00 Water Utility Fund $ 140,257.75
Total Funding $ 918,521.75
ALTERNATIVES:
Reject all bids. Rebidding the project could result in higher costs. Delay in project expenditures will also result in delays drawing down CDBG funds. Failure of the City to meet timely use of funds can result in loss of future CDBG funds to the City.
ATTACHMENTS:
1. Resolution Approving Contract Award
a. Exhibit 1, Agreement
2. Resolution Approving Budget Amendment
a. Exhibit A
3. Location Map
Attachment 1
Contract Award Resolution
RESOLUTION NO. 25-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA,
CALIFORNIA APPROVING THE CONTRACT AWARD FOR THE CLINTON STREET SEWER AND WATER MAIN PROJECT, CITY PROJECT R-97 IN THE AMOUNT OF $767,246.75 TO UNITED PAVEMENT MAINTENANCE INC,
AND AUTHORIZING CONSTRUCTION CONTINGENCIES RELATING TO THE
CONTRACT
WHEREAS, on December 18, 2024 the City of Madera (City) Engineering Department released a solicitation for construction bids for the Clinton Street Sewer and Water Main Project, City Project R-97 hereinafter referred to as “the Project”; and WHEREAS, seven sealed bids were received on January 21, 2025 and opened by the City Engineer; and
WHEREAS, funding for the Project is programmed in the Capital Improvement Projects (CIP) Budget for Fiscal Year 2024/25 under CIP Project R-97 and CDBG Block Grant B23MC060053.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA HEREBY finds, orders and resolves as follows:
1. The above recitals are true and correct.
2. The City Council (Council) has reviewed and considered all of the information presented including the report to Council from the Engineering Department.
3. The City finds that United Pavement Maintenance, Inc. is the lowest responsible and responsive bidder.
4. The contract for the Project in the Amount of $767,246.75 to United Pavement Maintenance, Inc, a copy of which is attached hereto as Exhibit 1 and referred to for particulars, is approved.
5. Council authorizes Construction Contingencies of up to 10 percent as approved by the City Engineer.
6. This Resolution is effective immediately upon adoption. *******
Exhibit 1
Agreement
AGREEMENT
THIS AGREEMENT, made this 5th day of February 2025, between the City of Madera, hereinafter called “OWNER”, and United Pavement Maintenance Inc. doing business as a corporation, hereinafter called “CONTRACTOR”.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The CONTRACTOR shall commence and complete all WORK required for the “CLINTON STREET SEWER AND WATER MAIN PROJECT, CITY PROJECT NO. R-97 BLOCK GRANT B23MC060053”
2. The CONTRACTOR shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the WORK described herein.
3. The CONTRACTOR shall commence the WORK required by the CONTRACT DOCUMENTS within 10 calendar days after the date of the NOTICE TO PROCEED and will complete the same within the time period set forth in the CONTRACT DOCUMENTS. The CONTRACTOR shall submit a Payment Bond and Performance Bond in the amount of $ $767,246.75, each and Insurance Certificates as specified in the CONTRACT DOCUMENTS prior to commencing any WORK.
4. The CONTRACTOR agrees to perform all of the WORK described in the DOCUMENTS for the unit and lump sum prices set forth in the Bid Schedule.
5. The term “CONTRACT DOCUMENTS” means and includes the following:
(A) Advertisement for Bids
(B) Information for Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Insurance Requirements for Contractors
PLANS AND SPECIFICATIONS prepared or issued by CITY OF MADERA entitle “CLINTON AVENUE SEWER REHABILITATION AND WATER MAIN REPLACEMENT PROJECT NO R-97” dated 12/4/2024
6. In the event the CONTRACTOR does not complete the WORK within the time limit specified herein or within such further time as authorized, the CONTRACTOR shall pay to the OWNER liquidated damages in the amount of Three Thousand Six Hundred Dollars ($ 3,600.00) per day for each and every calendar day delay in finishing the WORK beyond the completion date so specified.
7. The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. In no event shall total compensation exceed $ 767,246.75 except as may otherwise be authorized in writing per Section 16. For any moneys earned by the CONTRACTOR and withheld by the OWNER to ensure the performance of the Contract, the CONTRACTOR may, at his request and expense, substitute securities equivalent to the amount withheld in the form and manner and subject to the conditions provided in Division 2, Part 5, Section 22300 of the Public Contract Code of the State of California.
8. In the event of a dispute between the OWNER and the CONTRACTOR as to an interpretation of any of the specifications or as to the quality or sufficiency of material or workmanship, the decision of the OWNER shall for the time being prevail and the CONTRACTOR, without delaying the job, shall proceed as directed by the OWNER without prejudice to a final determination by negotiation, arbitration by mutual consent or litigation, and should the CONTRACTOR be finally determined to be either wholly or partially correct, the OWNER shall reimburse him for any added costs he may have incurred by reason of work done or material supplied beyond the terms of the contract as a result of complying with the OWNER’S directions as aforesaid. In the event the CONTRACTOR shall neglect to prosecute the work properly or fail to perform any provisions of the CONTRACT, the OWNER, after three days written notice to the CONTRACTOR, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due to the CONTRACTOR, subject to final settlement between the parties as in this paragraph herein above provided. 8A. CLAIMS RESOLUTION PROCESS FOR DISPUTES.
It is the intent of this Contract that disputes regarding the Contract be resolved promptly and fairly between the Contractor and the Owner. However, it is recognized that some disputes will require detailed investigation and review by one or both parties before a determination and resolution can be reached.
For the protection of the rights of both the Contractor and the Owner, the following provisions are provided for the resolution of disputes which cannot be resolved by the Owner and the Contractor within three business days after either party gives verbal notice of dispute or potential dispute to the other's attention and prior to the commencement of such work.
The following provisions are intended by Contractor and Owner to comply with Public Contract Code Sections 9204 and 20104 et. seq.
A. Claims:
The term “claim” refers to a separate demand by Contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
1. A time extension, including, without limitation, for relief from damages or penalties for delay assessed by Owner under this Contract.
2. Payment by the Owner of money or damages arising from work done by, or on behalf of, the Contractor pursuant to the Contract and payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled.
3. Payment of an amount that is disputed by the Owner.
B. The Claim Must Be Timely and in Writing:
For all claims the claim must be in writing and include the documents necessary to substantiate the claim. A notice of potential claim must be filed within five (5) business days of Contractor’s completion of work that is a potential claim. Notice of an actual claim must be filed on or before the date of final payment.
C. Receipt of Claim by Owner:
Upon receipt of a claim pursuant to this section, the Owner will conduct a reasonable review of the claim and, within a period not to exceed 45 days from the date of receipt, will provide the Contractor with a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, Owner and Contractor may, by mutual agreement, extend the time period provided in this section.
The Contractor shall furnish reasonable documentation to support the claim. If additional information is thereafter required, it shall be requested and provided upon mutual agreement by the Owner and the Contractor. The District's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation.
D. City Council Approval:
If the Owner needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the Owner shall have up to three days following the next duly publicly noticed regular meeting of the City Council after the 45-day period or extension expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
E. Payment of Claim:
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the Owner issues its written statement. If the Owner fails to issue a written statement, paragraph F below shall apply.
F. Meet and Confer:
If the Contractor disputes the Owner’s written response, or if the Owner fails to respond to a claim issued pursuant to this section within the time prescribed, the Contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.
Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the Owner shall schedule a meet and confer conference within 30 days for settlement of the dispute.
Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the Owner shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the Owner issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the Owner and the Contractor sharing the associated costs equally. The Owner and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
Under this Contract, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
Unless otherwise agreed to by the Owner and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced.
If mediation as set forth above does not resolve the parties’ dispute, the parties will proceed to arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program.
G. Filing a Government Code Written Claim Notice:
Following the meet and confer conference, if the claim or any portion remains in dispute, the Contractor may file a claim under the Torts Claims Act as provided in Chapter 1 (commencing with Section 900) and Chapter 2 commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code Section 900.
H. Owner’s Failure to Respond to Claim:
Failure by the Owner to respond to a claim from Contractor within the time periods described above or to otherwise meet the time requirements set forth above shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the Owner’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the Contractor.
I. Interest:
Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
J. Subcontractor Claims:
If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against Owner because privity of contract does not exist, the Contractor may present to the Owner a claim on behalf of a subcontractor or lower tier subcontractor. For purposes of this paragraph, the term “subcontractor’ means any type of subcontractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with the Contractor or is a lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the Contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the Owner shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the Contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the Owner and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
K. Filing of Action on Unresolved Claims:
The parties shall follow the procedures set forth in Public Contracts Code Section 20104.4 if an action is filed to resolve claims under the foregoing provisions. Any action shall be filed in Madera County.
9. Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical conditions, marital status, or sex of such persons except as provided in Section 12940 of the Government Code, and every contractor for public works violating this section is subject to all the penalties imposed for by violation of this chapter”.
10. In accordance with the provisions of Article 5, Chapter l, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part l, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, the CONTRACTOR is required to secure the payment of compensation to his employees and shall for that purpose obtain and keep in effect adequate Worker’s Compensation Insurance.
The undersigned CONTRACTOR is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against Liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the WORK of this Agreement.
11. The CONTRACTOR shall comply with Part 7, Chapter l, Article 2, Section 1775 of the Labor Code of the State of California. The CONTRACTOR shall, as a penalty to the OWNER, forfeit fifty dollars ($50.00) for each calendar day, or portion thereof, for each workman paid less than the prevailing rates for such work or craft in which such workman is employed for any public work done under the Contract by him or by any SUBCONTRACTOR under him. The difference between such prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than a prevailing wage rate, shall be paid to each workman by the CONTRACTOR.
12. The CONTRACTOR shall comply with Part 7, Chapter l, Article 2, Section 1776 of the Labor Code of the State of California. The CONTRACTOR shall keep and require that all SUBCONTRACTORS keep accurate payroll records showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice worker or other employee employed by him in connection with public work. Such payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of the CONTRACTOR by the OWNER, its officers and agents and to the representatives of the Division of Labor Law Enforcement of the State Department of Industrial Relations. In the event of non-compliance with the requirements of Section 1776, the CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects the CONTRACTOR must comply. Should non-compliance still be evident after the ten (10) day period, the CONTRACTOR shall, as a penalty to the OWNER forfeit twenty-five dollars ($25.00) for each calendar day, or portion thereof, for each worker until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due.
13. Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the CONTRACTOR or any SUBCONTRACTOR under him. It is the CONTRACTOR’S responsibility to ensure compliance by both itself and all SUBCONTRACTORS.
Section 1777.5 provides, in part, as follows:
The CONTRACTOR or SUBCONTRACTOR, if he is covered by this section, upon the issuance of the approval certificate, or if he has been previously approved in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeyman stipulated in the apprenticeship standards. Upon proper showing by the CONTRACTOR that he employs apprentices in the craft or trade in the State on all of his/her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by a journeyman, or in the land surveyor classification, one apprentice for each five journeyman, the Division of Apprenticeship Standards may grant a certification exempting the CONTRACTOR from the one (1) to five (5) hourly ratio as set forth in this section. This section shall not apply to contracts of general CONTRACTORS or to contracts of specialty contractors not bidding for work through a general or prime CONTRACTOR, when the contracts of general CONTRACTORS, or those specialty CONTRACTORS involve less than thirty thousand dollars ($30,000). Any work performed by a journeyman in excess of eight hours per day or forty (40) hours per week shall not be used to calculate the hourly ratio required by this section.
Apprenticeable craft or trade, as used in this section, shall mean a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the Apprenticeship Council. The joint apprenticeship committee shall have the discretion to grant a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting a CONTRACTOR from the 1 to 5 ratio set forth in this section when it finds that any one of the following conditions is met:
(a) In the event unemployment for the previous three-month period in such area exceeds an average of 15 percent, or
(b) In the event the number of apprentices in training in such area exceeds a ratio of 1 to 5, or (c) If there is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either (1) on a statewide basis, or (2) on a local basis, or
(d) If assignment of an apprentice to any work performed under a public works contract would create a condition which should jeopardize his life or the life, safety, or property of fellow employees, or the public at large or if the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
When such exemptions are granted to an organization which represents CONTRACTORS in a specific trade from the 1 to 5 ratio on a local or statewide basis the member CONTRACTORS will not be required to submit individual applications for approval to local joint apprenticeship committees, provided they are already covered by the local apprenticeship standards.
The CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in apprenticeable trade on such contracts and if other CONTRACTORS on the public work site are making such contributions. The CONTRACTOR, and any SUBCONTRACTOR under him, shall comply with the requirements of Sections 1777.5 and 1777.6 of the Labor Code in the employment of apprentices.
Information relative to number of apprentices, identifications, wages, hours of employment and standards of working conditions shall be obtained from the Division of Apprenticeship Standards. Consult the white pages of your telephone directory under California, State of, Industrial Relations, Apprenticeship Standards, for the telephone number and address of the nearest office. Willful failure by the CONTRACTOR to comply with the provisions of Sections 1777.5 will subject the CONTRACTOR to the penalties set forth in Section 1777.7 of the Labor Code.
14. Pursuant to California Labor Code Section 1813, eight hours in any one calendar day and forty (40) hours in any calendar week shall be the maximum hours any workman is required or permitted to work, except in cases of extraordinary emergency caused by fires, flood, or danger to life and property.
The CONTRACTOR doing the work, or his duly authorized agent, shall file with OWNER a report, verified by his oath, setting forth the nature of the said emergency, which report shall contain the name of said worker and the hours worked by him on the said day, and the CONTRACTOR and each SUBCONTRACTOR shall also keep an accurate record showing the names and actual hours worked of all workers employed by him in connection with the work contemplated by this Agreement, which record shall be open at all reasonable hours to the inspection of the OWNER, or its officer or agents and to the Chief of all Division of Labor Statistics and Law Enforcement of the Department of Industrial Relations, his deputies or agents; and it is hereby further agreed that said CONTRACTOR shall forfeit as a penalty to the OWNER the sum of Twenty-Five Dollars ($25.00) for each laborer, workman or any SUBCONTRACTOR under him for each calendar day during which such laborer, workman or mechanic is required or permitted to labor more than eight (8) hours in violation of this stipulation.
Overtime and shift work may be established as a regular procedure by the CONTRACTOR with reasonable notice and written permission of the OWNER. No work other than overtime and shift work established as a regular procedure shall be performed between the hours of 6:00 P.M. and 7:00 A.M. nor on Saturdays, Sundays or holidays except such work as is necessary for the proper care and protection of the work already performed or in case of an emergency.
CONTRACTOR agrees to pay the costs of overtime inspection except those occurring as a result of overtime and shift work established as a regular procedure. Overtime inspection shall include inspection required during holidays, Saturdays, Sundays and weekdays. Costs of overtime inspection will cover engineering, inspection, general supervision and overhead expenses which are directly chargeable to the overtime work. CONTRACTOR agrees that OWNER shall deduct such charges from payments due the CONTRACTOR.
15. The CONTRACTOR shall comply with Division 2, Chapter 4, Part 1 of the Public Contract Code relating to subletting and subcontracting, specifically included but not limited to Sections 4104, 4106, and 4110, which by this reference are incorporated into this Agreement as though fully set forth herein.
16. The CONTRACTOR and the OWNER agree that changes in this Agreement or in the work to be done under this Agreement shall become effective only when written in the form of a supplemental agreement or change order and approved and signed by the OWNER and the CONTRACTOR. It is specifically agreed that the OWNER shall have the right to request any alterations, deviations, reductions or additions to the contract or the plans and specifications or any of them, and the amount of the cost thereof shall be added to or deducted from the amount of the contract price aforesaid by fair and reasonable valuations thereof.
This contract shall be held to be completed when the work is finished in accordance with the original plans and specifications as amended by such changes. No such change or modification shall release or exonerate any surety upon any guaranty or bond given in connection with this contract.
17. Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees, and volunteers from and against all liability, loss, damage, expense, and cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's negligence, recklessness, or willful misconduct in the performance of work hereunder, or its failure to comply with any of its obligations contained in this AGREEMENT, except such loss or damage caused by the sole active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation, reasonable legal counsel fees, expert fees, and all other costs and fees of litigation.
The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless, or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
Contractor obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.
Contractor agrees to obtain or cause to be obtained executed defense and indemnity agreements with provisions identical to those set forth in this Section from each and every Subcontractor and Subconsultant, of every Tier. In the event the Contractor fails to do so, Contractor agrees to be fully responsible to provide such defense and indemnification according to the terms of this Section.
18. Contractor must comply with the insurance requirements as described in the section “INSURANCE REQUIREMENTS FOR CONTRACTOR”, pages 39-40 of the Contract Documents.
19. Amendments- Any changes to this Agreement requested by either City or United Pavement Maintenance Inc. may only be effected if mutually agreed upon in writing by duly authorized representatives of the parties hereto. This Agreement shall not be modified or amended or any rights of a party to it waived except by such writing.
20. Termination.
A. This Agreement may be terminated at any time by either party upon fifteen (15) calendar days written notice. In the event the Agreement is terminated by either party, United Pavement Maintenance Inc. shall be compensated for services performed to the date of termination based upon the compensation rates and subject to the maximum amounts payable agreed to together with such additional services performed after termination which are authorized in writing by the City representative to wind up the work performed to date of termination.
B. City may immediately suspend or terminate this Agreement in whole or in part by written notice where, if in the determination of City, there is:
1. An illegal use of funds by United Pavement Maintenance Inc.;
2. A failure by United Pavement Maintenance Inc. to comply with any material term of this Agreement;
3. A substantially incorrect or incomplete report submitted by United Pavement Maintenance Inc. to City.
In no event shall any payment by City or acceptance by United Pavement Maintenance Inc. constitute a waiver by such party of any breach of this Agreement or any default which may then exist on the part of either party. Neither shall such payment impair or prejudice any remedy available to either party with respect to such breach or default. City shall have the right to demand of United Pavement Maintenance Inc. the repayment to City of any funds disbursed to United Pavement Maintenance Inc. under this Agreement which, as determined by the appropriate court or arbitrator, were not expended in accordance with the terms of this Agreement.
Notice of termination shall be mailed to the City:
City of Madera
Engineering Department
428 E. Yosemite Avenue
Madera, Ca 93638
To the Contractor United Pavement Maintenance Inc.
Notices. All notices and communications from the United Pavement Maintenance Inc. shall be to City's designated Project Manager or Principal-In-Charge. Verbal communications shall be confirmed in writing. All written notices shall be provided and addressed as soon as possible, but not later than thirty (30) days after termination.
21. Compliance With Laws- City shall comply with all Federal, State and local laws, ordinances, regulations and provisions applicable in the performance of City’s services.
Wherever reference is made in this Agreement to standards or codes in accordance with which work is to be performed or tested, the edition or revision of the standards or codes current on the effective date of this Agreement shall apply, unless otherwise expressly stated.
22. Attorneys’ Fees/Venue- In the event that any action is brought to enforce the terms of this Agreement, the party found by the court to be in default agrees to pay reasonable attorneys’ fees to the successful party in an amount to be fixed by the Court. The venue for any claim being brought for breach of this Agreement shall be in Madera County or as appropriate in the U.S. District Court for the Eastern District of California, located in the City of Madera.
23. Governing Law- The laws of the State of California shall govern the rights and obligations of the parties under the Agreement, including the interpretation of the Agreement. If any part of the Agreement is adjudged to be invalid or unenforceable, such invalidity shall not affect the full force and effect of the remainder of the Agreement.
24. City’s Authority- Each individual executing or attesting to this Agreement on behalf of the City hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with a duly adopted resolution of the corporation’s articles of incorporation or charter and bylaws; (ii) that this Agreement is binding upon such corporation; and (iii) that Contractor is a duly organized and legally existing municipal corporation in good standing in the State of California.
25. Contractor’s Legal Authority - Each individual executing or attesting this Agreement on behalf of United Pavement Maintenance Inc. hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with such corporation’s articles of incorporation or charter and by-laws; (ii) that this Agreement is binding upon such corporation; and (iii) that United Pavement Maintenance Inc. is a duly organized and legally existing corporation in good standing in the State of California.
26. Remedies for Default. Failure by a party to perform any term, condition or covenant required of the party under this Agreement shall constitute a “default” of the offending party under this Agreement. In the event that a default remains uncured for more than ten (10) days following receipt of written notice of default from the other party, a "breach" shall be deemed to have occurred. Any failure or delay by a party in asserting any of its rights and remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default.
27. Independent Contractor. In performance of the work, duties, and obligations assumed by the Contractor under this Agreement, it is mutually understood and agreed that the City, including any and all of City’s officers, agents and employees will, at all times, be acting and performing as an independent contractor, and shall act in an independent capacity and not as an officer, agent, servant, employee, joint venturer, partner, or associate of City. Furthermore, City shall have no right to control or supervise or direct the manner or method by which City shall perform its work and functions. The City shall comply with all applicable provisions of law and the rules and regulations, if any, of governmental authorities having jurisdiction over the subject matter hereof.
Because of its status as an independent contractor, City shall have absolutely no right to employment rights and benefits available to City employees. City shall be solely liable and responsible for providing to, or on behalf of, its employees all legally required employee benefits. In addition, City shall be solely responsible and hold City harmless from all matters relating to payment of City’s employees, including compliance with Social Security, withholding and all other regulations governing such matters. It is acknowledged that during the term of this Agreement, City may be providing services to others unrelated to City or to this Agreement.
28.Sole Agreement- This instrument constitutes the sole and only Agreement between City and United Pavement Maintenance Inc. in connection to the Project and correctly sets forth the obligations of the City and United Pavement Maintenance Inc. to each other as of its date. Any Agreements or representations in connection with the Project, not expressly set forth in this instrument are null and void.
27. Assignment-Neither the United Pavement Maintenance Inc. nor City will assign its interest in this Agreement without the written consent of the other. 28 This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
IN WITNESS WHEREOF the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in THREE copies, each of which shall be deemed an original on the date first above written.
City of Madera
Herein Called OWNER
By:
Cecelia Gallegos, Mayor
APPROVE AS TO FORM:
Shannon L. Chaffin, City Attorney
ATTEST:
Alicia Gonzales, City Clerk
BY:
Herein Called CONTRACTOR
BY:
Federal Tax I.D. No.
___________________________
Contractor License Number
_____________________________
DIR Registration Number
Attachment A- General Wage Decision No. CA20250018 01/10/2025 Rodolfo Ruvalcaba and Mabel Ruvalcaba
United Pavement Maintenance, Inc.
47-1439289
905503
1000878534
NOTE: This Notary Acknowledgment on the following page is required for verification of Contractor’s signature.
Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
California Notary acknowledgement required to be attached. "General Decision Number: CA20250018 01/10/2025
Superseded General Decision Number: CA20240018
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________ |If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the | |2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2025. |
|______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2025. |
|______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 1/72
Attachment A
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2025
1 01/10/2025
ASBE0016-004 05/01/2024
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)
Area 1......................$ 34.56 11.40
Area 2......................$ 36.53 9.27
---------------------------------------------------------------- ASBE0016-008 01/01/2024
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
Protective Coverings,
Coatings, and Finishes to all
types of mechanical systems)
Area 1......................$ 84.76 25.07
Area 2......................$ 64.56 25.07
---------------------------------------------------------------- BOIL0549-001 01/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
Rates Fringes
BOILERMAKER
Area 1......................$ 49.62 41.27
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 2/72
Area 2......................$ 45.60 38.99
---------------------------------------------------------------- BRCA0003-001 08/01/2023
Rates Fringes
MARBLE FINISHER..................$ 41.18 18.58
---------------------------------------------------------------- BRCA0003-003 08/01/2023
Rates Fringes
MARBLE MASON.....................$ 60.20 28.82
---------------------------------------------------------------- BRCA0003-005 05/01/2024
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings,
Madera, Mariposa, Merced....$ 51.17 25.80
( 7) San Francisco, San
Mateo.......................$ 57.02 28.50
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 56.94 26.28
( 9) Calaveras, San
Joaquin, Stanislaus,
Toulumne....................$ 52.76 25.01
(16) Monterey, Santa Cruz...$ 54.18 27.82
---------------------------------------------------------------- BRCA0003-008 07/01/2023
Rates Fringes
TERRAZZO FINISHER................$ 43.90 19.51
TERRAZZO WORKER/SETTER...........$ 59.06 28.31
---------------------------------------------------------------- BRCA0003-011 04/01/2024
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
Rates Fringes
TILE FINISHER
Area 1......................$ 37.75 19.28
Area 2......................$ 34.76 19.22
Area 3......................$ 32.68 18.32
Tile Layer
Area 1......................$ 59.92 22.62
Area 2......................$ 55.17 22.52
Area 3......................$ 50.28 22.05
---------------------------------------------------------------- CARP0022-001 07/01/2023
San Francisco County
Rates Fringes
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 3/72
Carpenters
Bridge Builder/Highway
Carpenter...................$ 60.39 33.52
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 60.54 33.52
Journeyman Carpenter........$ 60.39 33.52
Millwright..................$ 60.49 35.11
---------------------------------------------------------------- CARP0034-001 07/01/2021
Rates Fringes
Diver
Assistant Tender, ROV
Tender/Technician...........$ 54.10 34.69
Diver standby...............$ 60.51 34.69
Diver Tender................$ 59.51 34.69
Diver wet...................$ 103.62 34.69
Manifold Operator (mixed
gas)........................$ 64.51 34.69
Manifold Operator (Standby).$ 59.51 34.69
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under
pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
---------------------------------------------------------------- CARP0034-003 07/01/2021
Rates Fringes
Piledriver.......................$ 54.10 34.69
---------------------------------------------------------------- CARP0035-007 07/01/2020
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 4/72
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Rates Fringes
Modular Furniture Installer
Area 1
Installer..................$ 28.76 22.53
Lead Installer.............$ 32.21 23.03
Master Installer...........$ 36.43 23.03
Area 2
Installer..................$ 26.11 22.53
Lead Installer.............$ 29.08 23.03
Master Installer...........$ 32.71 23.03
Area 3
Installer..................$ 25.16 22.53
Lead Installer.............$ 27.96 23.03
Master Installer...........$ 31.38 23.03
---------------------------------------------------------------- CARP0035-008 08/01/2020
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 52.65 31.26
Area 2......................$ 46.77 31.26
Area 3......................$ 47.27 31.26
Area 4......................$ 45.92 31.26
Drywall Stocker/Scrapper
Area 1......................$ 26.33 18.22
Area 2......................$ 23.39 18.22
Area 3......................$ 23.64 18.22
Area 4......................$ 22.97 18.22
---------------------------------------------------------------- CARP0152-001 07/01/2020
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 52.80 30.82
Journeyman Carpenter........$ 52.65 30.82
Millwright..................$ 52.75 32.41
---------------------------------------------------------------- 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 5/72
CARP0152-002 07/01/2020
San Joaquin County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 46.92 30.82
Journeyman Carpenter........$ 46.77 30.82
Millwright..................$ 49.27 32.41
---------------------------------------------------------------- CARP0152-004 07/01/2020
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 45.57 30.82
Journeyman Carpenter........$ 45.42 30.82
Millwright..................$ 47.92 32.41
---------------------------------------------------------------- CARP0217-001 07/01/2023
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 60.39 33.52
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 60.54 33.52
Journeyman Carpenter........$ 60.39 33.52
Millwright..................$ 60.49 35.11
---------------------------------------------------------------- CARP0405-001 07/01/2021
Santa Clara County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 6/72
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP0405-002 07/01/2021
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0505-001 07/01/2021
Santa Cruz County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0605-001 07/01/2021
Monterey County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0701-001 07/01/2021
Fresno and Madera Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 7/72
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- CARP0713-001 07/01/2021
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP1109-001 07/01/2021
Kings County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- * ELEC0006-004 12/01/2024
SAN FRANCISCO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 57.18 3%+27.15
Technician..................$ 65.76 3%+27.15
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 8/72
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0006-007 06/01/2024
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 91.25 3%+45.315
---------------------------------------------------------------- ELEC0100-002 06/01/2024
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 45.00 29.15
---------------------------------------------------------------- ELEC0100-005 12/01/2024
FRESNO, KINGS, MADERA
Rates Fringes
Communications System
Installer...................$ 45.28 28.01
Technician..................$ 52.07 28.21
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance,
background-foreground music, intercom and telephone
interconnect, inventory control systems, microwave
transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone
interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems,
Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical
entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video
entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 9/72
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be
installed on open wiring systems. Energy management
systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the
scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
---------------------------------------------------------------- ELEC0234-001 12/25/2023
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN
Zone A......................$ 65.16 29.55
Zone B......................$ 71.68 29.75
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
---------------------------------------------------------------- ELEC0234-003 12/01/2021
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 47.93 24.09
Technician..................$ 55.12 24.30
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 10/72
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0302-001 02/27/2023
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 68.92 32.67
ELECTRICIAN......................$ 61.26 32.44
---------------------------------------------------------------- ELEC0302-003 12/01/2023
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 48.44 27.60
Technician..................$ 55.71 27.82
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0332-001 06/01/2024
SANTA CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 100.25 46.72
ELECTRICIAN......................$ 87.17 46.33
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 11/72
protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
---------------------------------------------------------------- * ELEC0332-003 12/01/2024
SANTA CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 56.68 28.35
Technician..................$ 65.18 28.61
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-001 06/01/2024
ALAMEDA COUNTY
Rates Fringes
CABLE SPLICER....................$ 84.18 3%+44.68
ELECTRICIAN......................$ 73.20 3%+44.68
---------------------------------------------------------------- ELEC0595-002 06/01/2024
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 59.34 3%+30.48
ELECTRICIAN
(1) Tunnel work.............$ 51.92 3%+30.48
(2) All other work.........$ 49.45 3%+30.48
---------------------------------------------------------------- ELEC0595-006 12/01/2024
ALAMEDA COUNTY
Rates Fringes
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 12/72
Sound & Communications
Installer...................$ 56.68 3%+26.65
Technician..................$ 65.18 3%+26.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-008 12/01/2024
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
Communications System
Installer...................$ 45.28 3%+26.65
Technician..................$ 52.07 3%+26.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0617-001 06/01/2024
SAN MATEO COUNTY
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 13/72
Rates Fringes
ELECTRICIAN......................$ 82.00 48.05
---------------------------------------------------------------- ELEC0617-003 12/01/2023
SAN MATEO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 53.18 27.75
Technician..................$ 61.16 27.98
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0684-001 12/01/2024
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 48.50 30.09
CABLE SPLICER = 110% of Journeyman Electrician
---------------------------------------------------------------- * ELEC0684-004 12/01/2024
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System
Installer...................$ 45.28 28.01
Technician..................$ 52.07 28.21
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 14/72
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC1245-001 06/01/2024
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.46
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 53.30 22.01
(3) Groundman...............$ 40.76 21.51
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0008-001 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 80.76 37.885+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0003-001 06/28/2023
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
SEE AREA DEFINITIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 15/72
(AREA 1:)
GROUP 1.....................$ 60.72 31.03
GROUP 2.....................$ 59.19 31.03
GROUP 3.....................$ 57.71 31.03
GROUP 4.....................$ 56.33 31.03
GROUP 5.....................$ 55.06 31.03
GROUP 6.....................$ 53.74 31.03
GROUP 7.....................$ 52.60 31.03
GROUP 8.....................$ 51.46 31.03
GROUP 8-A...................$ 49.25 31.03
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 52.30 31.15
Oiler......................$ 43.79 31.15
Truck crane oiler..........$ 46.08 31.15
GROUP 2
Cranes.....................$ 50.54 31.15
Oiler......................$ 42.83 31.15
Truck crane oiler..........$ 45.07 31.15
GROUP 3
Cranes.....................$ 48.80 31.15
Hydraulic..................$ 44.44 31.15
Oiler......................$ 42.55 31.15
Truck crane oiler..........$ 44.83 31.15
GROUP 4
Cranes.....................$ 45.76 31.15
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 52.64 31.15
Oiler......................$ 43.38 31.15
Truck Crane Oiler..........$ 45.66 31.15
GROUP 2
Lifting devices............$ 50.82 31.15
Oiler......................$ 43.11 31.15
Truck Crane Oiler..........$ 45.41 31.15
GROUP 3
Lifting devices............$ 49.14 31.15
Oiler......................$ 42.89 31.15
Truck Crane Oiler..........$ 45.12 31.15
GROUP 4
Lifting devices............$ 47.37 31.15
GROUP 5
Lifting devices............$ 44.73 31.15
GROUP 6
Lifting devices............$ 42.50 31.15
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 53.27 31.15
Oiler......................$ 43.72 31.15
Truck Crane Oiler..........$ 45.95 31.15
GROUP 2
Cranes.....................$ 51.50 31.15
Oiler......................$ 43.45 31.15
Truck Crane Oiler..........$ 45.73 31.15
GROUP 3
Cranes.....................$ 50.02 31.15
Hydraulic..................$ 45.07 31.15
Oiler......................$ 43.23 31.15
Truck Crane Oiler..........$ 45.46 31.15
GROUP 4
Cranes.....................$ 48.00 31.15
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/116/72
GROUP 5
Cranes.....................$ 46.70 31.15
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 56.82 31.03
GROUP 1-A..................$ 59.29 31.03
GROUP 2....................$ 55.56 31.03
GROUP 3....................$ 54.23 31.03
GROUP 4....................$ 53.09 31.03
GROUP 5....................$ 51.95 31.03
UNDERGROUND:
GROUP 1....................$ 56.72 31.03
GROUP 1-A..................$ 59.19 31.03
GROUP 2....................$ 55.46 31.03
GROUP 3....................$ 54.13 31.03
GROUP 4....................$ 52.99 31.03
GROUP 5....................$ 51.85 31.03
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat
operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane
mounted continuous flight tie back machine, tonnage to
apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track
loader 4 cu. yds. and over; Wheel excavator (up to and
including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade
checker (GPS, mechanical or otherwise); Grooving and
grinding machine; Heading shield operator; Heavy-duty
drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/117/72
stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor,
building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine,
concrete or asphalt); Mine or shaft hoist; Portable
crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled
compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine,
truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600,
Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with
attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab
machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/118/72
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump
operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum
sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum
cooling plant; Welding machine (powered other than by
electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
----------------------------------------------------------
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and
including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck,
non-rotating over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
-----------------------------------------------------------
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and
including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 19/72
GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
-------------------------------------------------------------
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
-------------------------------------------------------------- --
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump
operator; Slusher operator
----------------------------------------------------------- AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]
AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE
AREA 2 -NOTED BELOW
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
CALAVERAS COUNTY:
Area 1: Remainder
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 20/72
Area 2: Eastern Part
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MADERA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MARIPOSA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MONTEREY COUNTY:
Area 1: Remainder
Area 2: Southwestern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- ENGI0003-008 08/01/2024
Rates Fringes
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 60.61 39.55
(2) Dredge Dozer; Heavy
duty repairman.............$ 55.65 39.55
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 54.53 39.55
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 51.23 39.55
AREA 2:
(1) Leverman...............$ 62.61 39.55
(2) Dredge Dozer; Heavy
duty repairman.............$ 57.65 39.55
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 56.53 39.55
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 53.23 39.55
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 21/72
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 22/72
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with Shasta County
Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
---------------------------------------------------------------- ENGI0003-019 07/01/2024
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 52.40 28.52
AREA 2.....................$ 54.40 28.52
GROUP 2
AREA 1.....................$ 48.80 28.52
AREA 2.....................$ 50.80 28.52
GROUP 3
AREA 1.....................$ 44.19 28.52
AREA 2.....................$ 46.19 28.52
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment
shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 23/72
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 24/72
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Reaminder
TEHAMA COUNTY:
Area 1: All but the Western border with mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- IRON0377-001 01/01/2024
ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES
Rates Fringes
Ironworkers:
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 52.08 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 25/72
$4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0377-003 01/01/2024
SAN FRANCISCO CITY and COUNTY
Rates Fringes
Ironworkers:
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 52.58 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0433-005 01/01/2024
REMAINING COUNTIES
Rates Fringes
IRONWORKER
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 47.45 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 26/72
Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-006 07/01/2024
AREA ""1"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND
SANTA CLARA COUNTIES
AREA ""2"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND
TUOLUMNE COUNTIES
Rates Fringes
LABORER (ASBESTOS/MOLD/LEAD
LABORER)
Area 1......................$ 37.75 29.69
Area 2......................$ 36.75 29.69
ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of
asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
---------------------------------------------------------------- LABO0073-002 07/01/2023
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0073-003 07/01/2023
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 27/72
SAN JOAQUIN COUNTY
Rates Fringes
LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0073-005 06/26/2023
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0073-007 06/26/2023
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 28/72
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/129/72
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair 1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/130/72
track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0073-009 07/01/2023
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-003 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 31/72
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0261-005 06/26/2023
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0261-009 06/26/2023
SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 31.37 23.20
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 32/72
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/133/72
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural 1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/134/72
and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0261-011 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
MASON TENDER, BRICK..............$ 37.05 27.45
FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage:
$2.50 per day additional.
---------------------------------------------------------------- LABO0261-014 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
PLASTER TENDER...................$ 41.93 30.32
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 35/72
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-003 07/01/2023
AREA A: SANTA CLARA
AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person
Area A.....................$ 37.26 27.30
Area B.....................$ 36.26 27.30
Traffic Control Person I
Area A.....................$ 37.56 27.30
Area B.....................$ 36.56 27.30
Traffic Control Person II
Area A.....................$ 35.06 27.30
Area B.....................$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0270-004 06/26/2023
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 36/72
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0270-005 07/01/2023
MONTEREY AND SAN BENITO COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0270-007 06/26/2023
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 37/72
Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/138/72
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 39/72
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-010 06/26/2023
SANTA CLARA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 40/72
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/141/72
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
---------------------------------------------------------- 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 42/72
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-011 07/01/2023
MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 40.68 29.68
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-001 07/01/2023
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
LABORER (Brick)
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0294-002 07/01/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0294-005 06/26/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 43/72
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0294-008 06/26/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 44/72
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/145/72
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/146/72
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0294-010 07/01/2023
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-011 07/01/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-002 07/01/2023
ALAMEDA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0304-003 06/26/2023
ALAMEDA COUNTY
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 47/72
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0304-004 06/26/2023
ALAMEDA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 48/72
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types 1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/149/72
regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/150/72
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0304-005 07/01/2023
ALAMEDA COUNTY
Rates Fringes
Brick Tender.....................$ 37.05 27.45
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-008 07/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-002 07/01/2023
CONTRA COSTA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 51/72
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0324-006 06/26/2023
CONTRA COSTA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0324-012 06/26/2023
CONTRA COSTA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 52/72
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 1-g...................$ 36.70 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/153/72
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, 1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/154/72
chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
---------------------------------------------------------------- 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 55/72
LABO0324-014 07/01/2023
CONTRA COSTA COUNTY:
Rates Fringes
Brick Tender.....................$ 37.05 27.45
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-018 07/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-002 07/01/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO1130-003 06/26/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 56/72
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO1130-005 07/01/2023
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO1130-007 06/26/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 57/72
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, 1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/158/72
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/159/72
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO1130-008 07/01/2023
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-009 07/01/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-001 01/01/2024
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA
CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
Painters:........................$ 50.51 27.66
PREMIUMS:
EXOTIC MATERIALS - $1.25 additional per hour.
SPRAY WORK: - $0.50 additional per hour.
INDUSTRIAL PAINTING - $0.25 additional per hour
[Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 60/72
HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
---------------------------------------------------------------- PAIN0016-003 01/01/2024
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Rates Fringes
Drywall Finisher/Taper
AREA 1......................$ 60.41 31.34
AREA 2......................$ 56.28 29.94
---------------------------------------------------------------- PAIN0016-012 01/01/2024
ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes
SOFT FLOOR LAYER.................$ 59.00 33.03
---------------------------------------------------------------- PAIN0016-015 01/01/2024
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PAINTER
Brush.......................$ 40.85 22.40
FOOTNOTES:
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.25 additional per hour.
HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour.
---------------------------------------------------------------- PAIN0016-022 01/01/2024
SAN FRANCISCO COUNTY
Rates Fringes
PAINTER..........................$ 54.13 27.66
---------------------------------------------------------------- PAIN0169-001 01/01/2023
FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:
Rates Fringes
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 61/72
GLAZIER..........................$ 44.33 28.88
---------------------------------------------------------------- PAIN0169-005 01/01/2024
ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
Rates Fringes
GLAZIER..........................$ 56.22 34.00
---------------------------------------------------------------- PAIN0294-004 07/01/2023
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
PAINTER
Brush, Roller...............$ 34.49 21.80
Drywall Finisher/Taper......$ 35.74 21.80
FOOTNOTE:
Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25
additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional. ---------------------------------------------------------------- PAIN0294-005 01/01/2023
FRESNO, KINGS & MADERA
Rates Fringes
SOFT FLOOR LAYER.................$ 38.53 23.19
---------------------------------------------------------------- PAIN0767-001 01/01/2024
CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
GLAZIER..........................$ 43.25 35.62
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
Employee required to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation.
---------------------------------------------------------------- PAIN1176-001 07/01/2022
HIGHWAY IMPR0VEMENT
Rates Fringes
Parking Lot Striping/Highway
Marking:
GROUP 1.....................$ 40.83 17.62
GROUP 2.....................$ 34.71 17.62
GROUP 3.....................$ 35.11 17.62
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 62/72
CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic
stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
---------------------------------------------------------------- PAIN1237-003 01/01/2024
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SOFT FLOOR LAYER.................$ 48.54 26.59
---------------------------------------------------------------- PLAS0066-002 07/01/2019
ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:
Rates Fringes
PLASTERER........................$ 42.41 30.73
---------------------------------------------------------------- PLAS0300-001 07/01/2018
Rates Fringes
PLASTERER
AREA 188: Fresno...........$ 32.70 31.68
AREA 224: San Benito,
Santa Clara, Santa Cruz.....$ 32.88 31.68
AREA 295: Calaveras & San
Joaquin Couonties...........$ 32.70 31.68
AREA 337: Monterey County..$ 32.88 31.68
AREA 429: Mariposa,
Merced, Stanislaus,
Tuolumne Counties...........$ 32.70 31.68
---------------------------------------------------------------- PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.15 23.27
---------------------------------------------------------------- PLUM0038-001 07/01/2023
SAN FRANCISCO COUNTY
Rates Fringes
PLUMBER (Plumber,
Steamfitter, Refrigeration
Fitter)..........................$ 85.50 48.98
---------------------------------------------------------------- PLUM0038-005 07/01/2023
SAN FRANCISCO COUNTY
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 63/72
Rates Fringes
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 72.68 32.91
---------------------------------------------------------------- PLUM0062-001 07/01/2024
MONTEREY AND SANTA CRUZ COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 53.00 41.70
---------------------------------------------------------------- PLUM0159-001 07/01/2024
CONTRA COSTA COUNTY
Rates Fringes
Plumber and steamfitter
(1) Refrigeration...........$ 65.28 48.04
(2) All other work..........$ 66.17 48.04
---------------------------------------------------------------- PLUM0246-001 07/01/2024
FRESNO, KINGS & MADERA COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 50.00 40.69
---------------------------------------------------------------- * PLUM0246-004 01/01/2017
FRESNO, MERCED & SAN JOAQUIN COUNIES
Rates Fringes
PLUMBER (PIPE TRADESMAN).........$ 13.00 ** 10.74
PIPE TRADESMAN SCOPE OF WORK:
Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry
packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems;
Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground
preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the
preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and
distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions;
Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman
---------------------------------------------------------------- 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 64/72
PLUM0342-001 07/01/2023
ALAMEDA & CONTRA COSTA COUNTIES
Rates Fringes
PIPEFITTER
CONTRA COSTA COUNTY.........$ 74.00 47.45
PLUMBER, PIPEFITTER,
STEAMFITTER
ALAMEDA COUNTY..............$ 74.00 47.45
---------------------------------------------------------------- PLUM0355-004 07/01/2024
ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA,
MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES:
Rates Fringes
Underground Utility Worker
/Landscape Fitter...........$ 34.51 18.30
---------------------------------------------------------------- PLUM0393-001 07/01/2021
SAN BENITO AND SANTA CLARA COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER...............$ 68.76 46.63
---------------------------------------------------------------- PLUM0442-001 07/01/2024
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 54.05 36.99
---------------------------------------------------------------- PLUM0467-001 07/01/2024
SAN MATEO COUNTY
Rates Fringes
Plumber/Pipefitter/Steamfitter...$ 83.75 40.65
---------------------------------------------------------------- * ROOF0027-002 09/01/2024
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ROOFER...........................$ 45.76 16.86
FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off:
$2.00 per hour additional.
---------------------------------------------------------------- 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 65/72
ROOF0040-002 08/01/2024
SAN FRANCISCO & SAN MATEO COUNTIES:
Rates Fringes
ROOFER...........................$ 55.30 22.97
---------------------------------------------------------------- ROOF0081-001 08/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Roofer...........................$ 52.47 22.31
---------------------------------------------------------------- ROOF0081-004 08/01/2024
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
ROOFER...........................$ 49.65 22.19
---------------------------------------------------------------- ROOF0095-002 08/01/2023
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:
Rates Fringes
ROOFER
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic
worker......................$ 57.17 21.51
Journeyman..................$ 53.17 21.51
Kettle person (2 kettles)...$ 55.17 21.51
---------------------------------------------------------------- SFCA0483-001 08/01/2024
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES:
Rates Fringes
SPRINKLER FITTER (FIRE)..........$ 79.13 38.51
---------------------------------------------------------------- SFCA0669-011 01/01/2024
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,
SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 44.32 27.83
---------------------------------------------------------------- SHEE0104-001 07/01/2020
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 66/72
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates Fringes
SHEET METAL WORKER
AREA 1:
Mechanical Contracts
under $200,000.............$ 55.92 45.29
All Other Work.............$ 64.06 46.83
AREA 2......................$ 52.90 36.44
AREA 3......................$ 55.16 34.18
---------------------------------------------------------------- SHEE0104-003 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 44.34 39.22
---------------------------------------------------------------- SHEE0104-005 07/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SHEET METAL WORKER (Excluding
metal deck and siding)...........$ 41.28 45.41
---------------------------------------------------------------- SHEE0104-007 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 44.07 40.79
---------------------------------------------------------------- SHEE0104-015 07/01/2020
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES:
Rates Fringes
SHEET METAL WORKER (Metal
Decking and Siding only).........$ 44.45 35.55
---------------------------------------------------------------- SHEE0104-018 07/01/2020
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
Sheet metal worker (Metal
decking and siding only).........$ 44.45 35.55
---------------------------------------------------------------- TEAM0094-001 07/01/2024
Rates Fringes
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 67/72
Truck drivers:
GROUP 1.....................$ 41.54 33.25
GROUP 2.....................$ 41.84 33.25
GROUP 3.....................$ 42.14 33.25
GROUP 4.....................$ 42.49 33.25
GROUP 5.....................$ 42.84 33.25
FOOTNOTES:
Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry
pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate.
Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up
truck: Use appropriate rate for the power unit or the
equipment utilized.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used
appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and
unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit
mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson;
Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor
GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull
trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with
self-contained refuse bin; Boom truck - hydro-lift or
Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A
bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil
trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow
GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when
pulling fuel and/or grease tank trailers or other
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/168/72
miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman
GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage
determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
---------------------------------------------------------------- The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 69/72
this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier. ?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
1/28/25,9:05AMSAM.gov
https://sam.gov/wage-determination/CA20250018/170/72
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to [email protected] or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to [email protected] or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to [email protected] or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================ 1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 71/72
END OF GENERAL DECISION"
1/28/25, 9:05 AM SAM.gov
https://sam.gov/wage-determination/CA20250018/1 72/72
Attachment 2
Budget Amendment Resolution
RESOLUTION NO. 25-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA,
CALIFORNIA AUTHORIZING AND APPROVING AN AMENDMENT TO THE CITY OF MADERA FISCAL YEAR 2024/2025 BUDGET TO APPROPRIATE
ADDITIONAL COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) FUNDS
TO THE CLINTON STREET SEWER AND WATER MAIN PROJECT, CITY PROJECT R-97
WHEREAS, on January 15, 2025 City Council approved Resolution 25-11 allocating $160,764 in CDBG funds to the Clinton Street Sewer and Water Main Project, City Project R-97 hereinafter referred to as “the Project”;and
WHEREAS, an amendment to the City of Madera Fiscal Year 20254/2025 Budget, listed in Exhibit A, attached hereto, is necessary to appropriate funds for the contract award.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA HEREBY finds, orders and resolves as follows:
1. The above recitals are true and correct.
2. Funds shall be appropriated in the Fiscal Year 2024/2025 Budget in the amount of $160,764 from unprogrammed CDBG funds to the Project in accordance with Exhibit A, attached hereto and incorporated herein by reference.
3. The City Clerk is authorized and directed to forward a copy of the resolution to the Director of Financial Services who is authorized to take such action as necessary to implement the terms of this resolution.
4. This Resolution is effective immediately upon adoption. *******
EXHIBIT A
CITY OF MADERA
Budget Appropriations: Res. 25-
FUND ORG CODE OBJECT DESCRIPTION (+) (-)
CDBG Public improvements 10218020-E2427 4454 Carryover
Entitlement
$160,764
CDBG Public Improvements 10218020-E2427 7050 Construction $160,764 $160,764 $160,764
Attachment 3
Location Map
LOCATION MAP
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
Agenda Number: ___________
_________________________________
Joseph Hebert, Parks & Community Services Director
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Construction Agreement for Frank Bergon Senior Center Fencing RECOMMENDATION:
1. Adopt a Resolution Approving a Construction Agreement with Juarez Brothers General Engineering Inc, for Project “IFB 202324-31 Frank Bergon Senior Center Fencing, CBDG B22MC060053” for $137,622.76.
2. Adopt a Resolution Amending the City’s Fiscal Year 2024/25 Adopted Budget for $65,172.
SUMMARY:
The Frank A. Bergon Senior Center (FBSC) serves as a vital resource for the senior community in the City, providing essential services, social activities, and safe gathering space for residents.
However, the facility has been facing ongoing security challenges, necessitating the installation of a protective fence to safeguard both the building and its visitors.
Staff is proposing a construction agreement with Juarez Brothers General Engineering Inc, to furnish all the necessary materials, labor, supplies & equipment necessary to build a safety perimeter fence, originally funded by Community Development Block Grant funds. The agreement stipulates all the specifications, drawings and requirements necessary in accordance with the Invitation for Bid, for which no bid was presented after a competitive bidding process.
The amount of the agreement is $137,622.76.
DISCUSSION:
The absence of a protective barrier has led to unauthorized individuals accessing the FBSC premises, sometimes entering sensitive areas of the property. This poses a safety risk for both D-3
the FBSC programming attendees and staff, as well as potential damage to the facility itself. In the past year, staff has had a considerable number of incidents involving trespassers, and dealing with repercussions of encampment remains, even active ones during the day.
A safety perimeter fence would help provide security measures to maintain a controlled environment within the FBSC.
Background
During FY 23/24, the City received a total of $148,386 in Community Development Block Grant (CDBG) funding for improvements at the FBSC, including plans for a safety perimeter fence. To date several improvement projects have been completed at the FBSC with the award. These include the complete external painting of the building and the complete renovation of the kitchen area at the FBSC.
On May 17, 2024, the City released an Invitation for Bids (IFB) with the scope of work being the safety perimeter fence installation, “IFB 202324-31 Frank Bergon Senior Center Fencing, CBDG B22MC060053”. After completing the competitive bidding process, no bids were received.
Following past guidance and a procurement policy that allows for direct negotiation should no bids be received following a formal procurement process, staff initiated seeking a negotiated contract to progress with the project. This determination is in line with Public Contract Code 22038 section 3 which states:
If no bids are received through the formal or informal procedure, the project may be performed by the employees of the public agency by force account or negotiated contract without further complying with this article.
Staff made an informed decision about selecting a vendor to initiate negotiations, with the contract selected to initiate negotiations being Juarez Brothers General Engineering, Inc. For context, Juarez Brothers General Engineering, Inc. is a local contractor located in Madera County.
Juarez Brothers General Engineering, Inc. has an active Contractors State License and an active Department of Industrial Relations registration.
Juarez Brothers General Engineering, Inc. has provided a quote for the project, in the amount of $137,622.76. The initial probable construction estimate for the project was $110,512.64.
Since several improvements have already used up a portion of the CDBG award amount of $148,386, staff sought out other funding sources to be able to move forward with the project without having to utilize General Fund dollars. This request was answered when staff became aware of $225,936.54 of previously awarded CDBG funds unspent, with the potential of being reallocated towards the FBSC Improvement project. This would allow staff to cover the costs of installing a safety perimeter fence utilizing only CDBG funds.
The request for the reallocation of funds was presented to Council on November 20, 2024, initiating the reallocation process for the for the purpose of moving unspent/unobligated CDBG funds to both the Clinton Sewer and Water project and the FBSC Improvement project. The FBSC Improvement project was to be allocated an additional $65,172.23.
On January 15, 2025, the Council approved the additional CBDG funding for the FBSC Improvements project.
FINANCIAL IMPACT:
The FBSC Improvement project was budgeted in the Fiscal Year 2024/25 Adopted Budget in the amount of $122,226, based on unspent award amount from FY 2023/24. This FY so far, $42,919 has been spent on the project, leaving $79,307 available to cover the cost of the proposed contract. With the Council approving the amendment to the City’s CDBG Action Plan, reallocating the $65,172 of unspent CBDG funding to the project, this brings the available project balance to $144,479. This new total appropriation authority is sufficient to fully fund the proposed contract.
Table 1 below shows the CDBG expenditure for the FBSC Improvement project to date.
While the reallocation of unspent CDBG monies was approved by Council at its last meeting, the reallocated funds still need to be appropriated. Thus, staff is including in this item a Resolution that will amend the FY 2024/25 Adopted Budget to appropriate the $65,172 that was previously reallocated by Council.
Table 1: CDBG Award of $148,386 for FBSC Improvements Expenditure Vendor Amount
O’Dell Engineering; design services $20,999
QK Inc.; topography surveying $7,500
Patterson Painting $12,500
DL Batty, Inc.; kitchen renovations $27,410
CalCard charges for supplies $294
Capital improvement administration charges $376
Total Expenditure To Date $69,079
Remaining Balance To Date $79,307
Additional CDBG Appropriation $65,172
Total Project Balance After Additional Appropriation $144,479 ALTERNATIVES:
In considering the Council’s options, several potential alternatives are identified for consideration:
The Council may choose to request that staff bring additional information, documentation, or clarification to a subsequent meeting. The Council may decide to reject the request altogether, with staff welcoming any direction the Council may provide.
ATTACHMENTS:
1. Resolution Approving a Construction Agreement with Juarez Brothers General Engineering Inc, for Project “IFB 202324-31 Frank Bergon Senior Center Fencing, CBDG B22MC060053” for $137,622.76.
a. Exhibit A: Construction Agreement
2. Adopt a Resolution Amending the City’s Fiscal Year 2024/25 Adopted Budget for $65,172.
a. Exhibit A: Budget Amendment
ATTACHMENT 1
RESOLUTION NO. 25-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA,
CALIFORNIA APPROVING A CONSTRUCTION AGREEMENT WITH JUAREZ
BROTHERS GENERAL ENGINEERING INC OF CALIFORNIA, FOR THE CONSTRUCTION OF PROJECT “IFB 202324-31 FRANK BERGON SENIOR CENTER FENCING, CBDG B22MC060053” FOR THE AMOUNT OF
$137,632.76
WHEREAS, the absence of a protective fence around the Frank Bergon Senior Center has led to safety challenges in the building and its surroundings: and WHEREAS, City intends to implement security measures to maintain a controlled and secure environment in the facility; and
WHEREAS, all bidding requirements have been met to proceed with the project that concerns this staff report; and
WHEREAS, Juares Brothers General Engineering has agreed with the specifications of the agreement; and
WHEREAS, the funds required to enter into the agreement will come from Community Development Block Grant funding and have been previously approved by Council.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF MADERA hereby resolves, finds, determines and orders as follows:
1. The above recitals are true and correct.
2. The City Council approves the sole source Construction Agreement with Juarez Brothers General Engineering Inc in the amount of $137,632.76, attached as Exhibit A and incorporated herein.
3. This Resolution is effective immediately upon adoption. * * * * * * * *
Exhibit A: Construction Agreement
CONSTRUCTION AGREEMENT
IFB 202324-31 Frank Bergon Senior Center Fencing, CBDG B22MC060053 This Construction Agreement (“Agreement”) is made between the City of Madera, hereinafter called “OWNER” or “CITY” and JUAREZ BROTHERS GENERAL ENGINEERING INC., hereinafter “CONTRACTOR” and collectively called “Parties.” The Agreement is effective on the last date signed by the Parties at the end of this Agreement.
WITNESSETH: The Parties agree as follows:
1. Project. The CONTRACTOR shall commence and complete all WORK required for “IFB 202324-31 Frank Bergon Senior Center Fencing, CDBG B22MC060053”
2. Materials, Supplies, Equipment. The CONTRACTOR shall furnish all of the material, supplies, tools, equipment, labor, and other services necessary for the construction and completion of the WORK described in this Agreement.
3. Commencement of Work and Bonds. The CONTRACTOR shall commence the WORK required by the CONTRACT DOCUMENTS. After the NOTICE TO PROCEED there is a lead time of 5 to 6 weeks for the new fence material to be delivered, after the material arrives, the CONTRACTOR will complete the same within thirty (30) calendar days. The CONTRACTOR shall submit Payment Bond and Performance Bond in the amount of $137,622.76 and Insurance Certificates as specified in the CONTRACT DOCUMENTS prior to commencing any WORK within five (5) working days after being notified of the award of the contract.
4. Contract Amount. OWNER agrees to pay, and CONTRACTOR agrees to accept the sum of ONE HUNDRED & THIRTY-SEVEN THOUSAND, SIX HUNDRED AND TWENTY-TWO DOLLARS WITH SEVENTY-SIX CENTS. ($137,622.76) (“Contract Price”) subject to adjustments for changes in work as may be directed in writing by OWNER as payment in full for the WORK described in the CONTRACT DOCUMENTS. WORK performed at unit prices will be paid based on actual quantities of work performed and accepted.
5. Contract Documents. The CONTRACTOR shall commence and complete all WORK required in accordance with the following CONTRACT DOCUMENTS. The term “CONTRACT DOCUMENTS” means and includes the following:
B
CONTRACTOR Complete Bid Proposal – Frank Bergon Senior Center Fencing.
Attachment A: Insurance Requirements for Contractors. Attachment #: Juarez Brothers Quote.
6. Liquidated Damages. In the event the CONTRACTOR does not complete the WORK within the time limit specified in Section 3 or within such further time as authorized and without justification, the CONTRACTOR shall pay to the OWNER liquidated damages in the amount of TWO HUNDRED DOLLARS ($200.00) per day for each and every calendar day delay in finishing the WORK beyond the completion date so specified.
7. Payment to Contractor. As consideration for performance of the Work required herein, OWNER agrees to pay CONTRACTOR on a time and materials basis as set forth herein, a not-to-exceed amount of $137,622.76 (“Total Contract Price”) provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Contract or written change orders approved and signed in advance by the OWNER. (a) Periodic payments shall be made by the OWNER to CONTRACTOR within thirty (30) days of OWNER’S receipt of an application for payment from CONTRACTOR for services rendered. Payments to CONTRACTOR for work performed will be made on a monthly billing basis. The application shall include all information required by the OWNER and shall be in a format approved by the OWNER. This application shall be supported by evidence which is required by this Contract and such other documentation as the OWNER may require. The CONTRACTOR shall certify that the Work for which payment is requested has been done and that any materials listed are stored where indicated. OWNER shall review and pay the payment request in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. (b) Labor and Material Releases. CONTRACTOR shall furnish OWNER with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by OWNER.
8. Disputes. In the event of a dispute between the OWNER and the CONTRACTOR as to an interpretation of any of the specifications or as to the quality or sufficiency of material or workmanship, the decision of the OWNER shall for the time being prevail and the CONTRACTOR, without delaying the job, shall proceed as directed by the OWNER without prejudice to a final determination by negotiation, arbitration by mutual consent or litigation, and should the CONTRACTORbe finally determined to be either wholly or partially correct, the OWNER shall reimburse him for any added costs he may have incurred by reason of work done or material supplied beyond the terms of the contract as a result of complying with the OWNER’S directions as aforesaid. In the event the CONTRACTOR shall neglect to prosecute the work properly or fail to perform any provisions of the CONTRACT, the OWNER, after three days written notice to the CONTRACTOR, may, without prejudice to any other remedy it may have, make good such deficiencies, and may deduct the cost thereof from the payment then or thereafter due to the CONTRACTOR, subject to final settlement between the parties as in this paragraph herein above provided. 8A. Claims Resolution Process For Disputes.
It is the intent of this Contract that disputes regarding the Contract be resolved promptly and fairly between the Contractor and the Owner. However, it is recognized that some disputes will require detailed investigation and review by one or both parties before a determination and resolution can be reached. For the protection of the rights of both the Contractor and the Owner, the following provisions are provided for the resolution of disputes which cannot be resolved by the Owner and the Contractor within three business days after either party gives verbal notice of dispute or potential dispute to the other's attention and prior to the commencement of such work.
The following provisions are intended by Contractor and Owner to comply with Public Contract Code Sections 9204 and 20104 et. seq.
(a) Claims:
The term “claim” refers to a separate demand by Contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
i. A time extension, including, without limitation, for relief from damages or penalties for delay assessed by Owner under this Contract. ii. Payment by the Owner of money or damages arising from work done by, or on behalf of, the Contractor pursuant to the Contract and payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled.
iii. Payment of an amount that is disputed by the Owner. (b) The Claim Must Be Timely and in Writing:
For all claims the claim must be in writing and include the documents necessary to substantiate the claim. A notice of potential claim must be filed within five (5) business days of Contractor’s completion of work that is a potential claim. Notice of an actual claim must be filed on or before the date of final payment.
(c) Receipt of Claim by Owner:
Upon receipt of a claim pursuant to this section, the Owner will conduct a reasonable review of the claim and, within a period not to exceed 45 days from the date of receipt, will provide the Contractor with a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, Owner and Contractor may, by mutual agreement, extend the time period provided in this section.
The Contractor shall furnish reasonable documentation to support the claim.
If additional information is thereafter required, it shall be requested and provided upon mutual agreement by the Owner and the Contractor. The District's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation.
(d) City Council Approval:
If the Owner needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the Owner shall have up to three days following the next duly publicly noticed regular meeting of the City Council after the 45-day period or extension expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
(e) Payment of Claim:
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the Owner issues its written statement. If the Owner fails to issue a written statement, paragraph F below shall apply. (f) Meet and Confer:
If the Contractor disputes the Owner’s written response, or if the Owner fails to respond to a claim issued pursuant to this section within the time prescribed, the Contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, and return receipt requested, the Owner shall schedule a meeting and confer conference within 30 days for settlement of the dispute.
Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the Owner shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the Owner issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the Owner and the Contractor sharing the associated costs equally. The Owner and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
Under this Contract, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
Unless otherwise agreed to by the Owner and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced.
If mediation as set forth above does not resolve the parties’ dispute, the parties will proceed to arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program.
(g) Filing a Government Code Written Claim Notice:
Following the meet and confer conference, if the claim or any portion remains in dispute, the Contractor may file a claim under the Torts Claims Act as provided in Chapter 1 (commencing with Section 900) and Chapter 2 commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code Section 900.
(h) Owner’s Failure to Respond to Claim:
Failure by the Owner to respond to a claim from Contractor within the time periods described above or to otherwise meet the time requirements set forth above shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the Owner’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the Contractor.
(i) Subcontractor Claims:
If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against Owner because privity of contract does not exist, the Contractor may present to the Owner a claim on behalf of a subcontractor or lower tier subcontractor. For purposes of this paragraph, the term “subcontractor’ means any type of subcontractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with the Contractor or is a lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the Contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor.
The subcontractor requesting that the claim be presented to the Owner shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the Contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the Owner and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (j) Filing of Action on Unresolved Claims:
The parties shall follow the procedures set forth in Public Contracts Code Section 20104.4 if an action is filed to resolve claims under the foregoing provisions. Any action shall be filed in Madera County.
9. No Discrimination in Employment. Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical conditions, marital status, or sex of such persons except as provided in Section 12940 of the Government Code, and every contractor for public works violating this section is subject to all the penalties imposed for by violation of this chapter”.
10. Workers Compensation. In accordance with the provisions of Article 5, Chapter l, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part l, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, the CONTRACTOR is required to secure the payment of compensation to his employees and shall for that purpose obtain and keep in effect adequate Worker’s Compensation Insurance.
The undersigned CONTRACTOR is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against Liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the WORK of this Agreement.
11. Prevailing Wages. This Agreement is subject to California Labor Code Sections 1720, et seq., and Contractor and subcontractor shall pay not less than the specified prevailing rates of wage to all workers employed in performance of the Work.
Pursuant to the provisions of Section 1770 of the California Labor Code, OWNER has obtained the general prevailing rate of wages and employer payments for health and welfare, vacation, pension, and similar purposes, as determined by the Director of the Department of Industrial Relations, a copy of which is on file in the office of OWNER and shall be made available for viewing to any interested party upon request. The Contractor and each subcontractor shall forfeit as a penalty to OWNER not more than Two Hundred Dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the stipulated prevailing wage rate in violation of the Labor Code. In addition, the difference between the prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by the Contractor.
12. Public Works Contractor Registration. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relation. No bid will be accepted, nor any contract entered into without proof of the Contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. In addition, Contractor shall provide the registration number for each listed subcontractor in the space provided in the Designation of Subcontractors Form.
This Project is subject to compliance monitoring and enforcement by the Department of Relations. In executing this contract, Contractor acknowledges that it has reviewed all applicable labor compliance requirements and included the cost of complying with such requirements in its bid.
13. Payroll Records. The CONTRACTOR shall comply Section 1776 of the California Labor Code. The CONTRACTOR shall keep and require that all SUBCONTRACTORS keep accurate payroll records showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice worker or other employee employed by him in connection with public work. Such payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of the CONTRACTOR by the OWNER, its officers, and agents and to the representatives of the Division of Labor Law Enforcement of the State Department of Industrial Relations. In the event of non-compliance with the requirements of Section 1776, the CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects the CONTRACTOR must comply. If CONTRACTORor subcontractor does not comply after such ten (10) day period, the CONTRACTOR shall, as a penalty, forfeit one hundred dollars ($100) for each day or portion thereof for each worker until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due.
In accordance with California Labor Code Section 1771.4 Section 1771.4, CONTRACTOR and each subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (DIR) on a weekly basis and in the format prescribed by the DIR which may include electronic submission. CONTRACTOR shall comply with all applicable requirements and regulations from the DIR relating to labor compliance monitoring and enforcement.
14. Apprentices. Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the California Labor Code concerning the employment of apprentices by the CONTRACTORor any SUBCONTRACTOR. It is the CONTRACTOR’S responsibility to ensure compliance by both it and all SUBCONTRACTORS.
Section 1777.5 provides, in part, as follows:
The CONTRACTOR or SUBCONTRACTOR, if he is covered by this section, upon the issuance of the approval certificate, or if he has been previously approved in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeyman stipulated in the apprenticeship standards. Upon proper showing by the CONTRACTORthat he employs apprentices in the craft or trade in the State on all of his/her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by a journeyman, or in the land surveyor classification, one apprentice for each five journeyman, the Division of Apprenticeship Standards may grant a certification exempting the CONTRACTOR from the one (1) to five (5) hourly ratio as set forth in this section. This section shall not apply to contracts of general CONTRACTORS or to contracts of specialty contractors not bidding for work through a general or prime CONTRACTOR, when the contracts of general CONTRACTORS, or those specialty CONTRACTORS involve less than thirty thousand dollars ($30,000). Any work performed by a journeyman in excess of eight hours per day or forty (40) hours per week shall not be used to calculate the hourly ratio required by this section.
Apprenticeable craft or trade, as used in this section, shall mean a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the Apprenticeship Council. The joint apprenticeship committee shall have the discretion to grant a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting a CONTRACTOR from the 1 to 5 ratio set forth in this section when it finds that any one of the following conditions is met:
(a) In the event unemployment for the previous three-month period in such area exceeds an average of 15 percent, or
(b) In the event the number of apprentices in training in such area exceeds a ratio of 1 to 5, or
(c) If there is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either (1) on a statewide basis, or (2) on a local basis, or (d) If assignment of an apprentice to any work performed under a public works contract would create a condition which should jeopardize his life or the life, safety, or property of fellow employees, or the public at large or if the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
When such exemptions are granted to an organization which represents contractors in a specific trade from the 1 to 5 ratio on a local or statewide basis the member contractors will not be required to submit individual applications for approval to local joint apprenticeship committees, provided they are already covered by the local apprenticeship standards.
The CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in apprenticeable trade on such contracts and if other contractors on the public work site are making such contributions. The CONTRACTOR, and any SUBCONTRACTOR under him, shall comply with the requirements of Sections 1777.5 and 1777.6 of the Labor Code in the employment of apprentices. Information relative to number of apprentices, identifications, wages, hours of employment and standards of working conditions shall be obtained from the Division of Apprenticeship Standards. Consult the white pages of your telephone directory under California, State of, Industrial Relations, Apprenticeship Standards, for the telephone number and address of the nearest office. Willful failure by the CONTRACTOR to comply with the provisions of Sections 1777.5 will subject the CONTRACTOR to the penalties set forth in Section 1777.7 of the Labor Code.
15. Hours of Work. Pursuant to California Labor Code Section 1813, eight hours in any one calendar day and forty (40) hours in any calendar week shall be the maximum hours any worker is required or permitted to work, except in cases of extraordinary emergency caused by fires, flood, or danger to life and property or except as authorized under the overtime provisions in California Labor Code 1815.
Overtime and shift work may be established as a regular procedure by the CONTRACTOR with reasonable notice and written permission of the OWNER. No work other than overtime and shift work established as a regular procedure shall be performed between the hours of 6:00 P.M. and 7:00 A.M. nor on Saturdays, Sundays or holidays except such work as is necessary for the proper care and protection of the work already performed or in case of an emergency.
CONTRACTOR agrees to pay the costs of overtime inspection except those occurring as a result of overtime and shift work established as a regular procedure. Overtime inspection shall include inspection required during holidays, Saturdays, Sundays, and weekdays. Costs of overtime inspection will cover engineering, inspection, general supervision, and overhead expenses which are directly chargeable to the overtime work.
CONTRACTOR agrees that OWNER shall deduct such charges from payments due the CONTRACTOR.
16. Subcontracting. The CONTRACTOR shall comply with Division 2, Chapter 4, Part 1 of the Public Contract Code relating to subletting and subcontracting, specifically included but not limited to Sections 4104, 4106, and 4110, which by this reference are incorporated into this Agreement as though fully set forth herein.
17. Change Orders. The CONTRACTOR and the OWNER agree that changes in this Agreement or in the work to be done under this Agreement shall become effective only when written in the form of a change order and approved and signed by the OWNER and the CONTRACTOR. It is specifically agreed that the OWNER shall have the right to request any alterations, deviations, reductions or additions to the contract or the plans and specifications or any of them, and the amount of the cost thereof shall be added to or deducted from the amount of the contract price aforesaid by fair and reasonable valuations thereof.
This Agreement shall be held to be completed when the work is finished in accordance with the original plans and specifications as amended by such changes. No such change or modification shall release or exonerate any surety upon any guaranty or bond given in connection with this contract.
18. Indemnification. CONTRACTOR shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees, and volunteers from and against all liability, loss, damage, expense, and cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR’S negligence, recklessness, or willful misconduct in the performance of work hereunder, or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage caused by the sole active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and CONTRACTOR, or should City otherwise find CONTRACTOR’S legal counsel unacceptable, then CONTRACTOR shall reimburse the City its costs of defense, including without limitation, reasonable legal counsel fees, expert fees, and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the City (and its officers, officials, employees, and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’S negligent, reckless, or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
CONTRACTOR obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this Agreement, CONTRACTOR shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of City.
CONTRACTOR agrees to obtain or cause to be obtained executed defense and indemnity agreements with provisions identical to those set forth in this Section from each and every Subcontractor and Subconsultant, of every Tier. In the event the CONTRACTOR fails to do so, CONTRACTOR agrees to be fully responsible to provide such defense and indemnification according to the terms of this Section.
19. Contractor must comply with the insurance requirements as described in the section “INSURANCE REQUIREMENTS” of the Contract Documents.
20. Amendments. Any changes to this Agreement requested by either City or CONTRACTOR may only be effected if mutually agreed upon in writing by duly authorized representatives of the parties hereto. This Agreement shall not be modified or amended or any rights of a party to it waived except by such writing.
21. Termination.
(a) Termination of the Contract for Default.
i. General: If, prior to the acceptance of the Work, the CONTRACTOR:
1) Becomes insolvent, assigns its assets for the benefit of its creditors, or is otherwise financially unable to complete the Work;
2) Abandons the Work by failing to report to the Work site and diligently prosecute the Work to completion;
3) Disregards written instructions from the City Engineer or materially violates provisions of the Contract Documents; 4) Fails to prosecute the Work according to the schedule approved by the City Engineer;
5) Disregards laws or regulations of any public body having jurisdiction; or
6) Commits continuous or repeated violations of regulatory or statutory safety requirements, then the OWNER will consider the Contractor in default of the Contract.
(b) Notices: Notices and other written communications regarding default between the CONTRACTOR, the OWNER, and the SURETY shall be transmitted as follows:
i. Personal delivery with proof of delivery which may be made by declaration under penalty of perjury by any person over the age of 18 years. The proof of delivery shall show that delivery was performed in accordance with these provisions. Service shall be effective on the date of delivery. Notices given to the Contractor by personal delivery may be made to the Contractor’s authorized representative at the Work site; or
ii. Certified mail addressed to the mailing address of the recipient postage prepaid; return receipt requested. Service shall be effective on the date of the receipt of the mailing.
iii. Simultaneously, the OWNER may send the same notice by regular mail. If a notice that is sent by certified mail is returned unsigned, then delivery shall be effective pursuant to regular mail, provided that the notice that was sent by regular mail is not returned. (c) Notice to Cure: The OWNER will issue a written notice to cure the default to the Contractor and its Surety. The Contractor shall commence satisfactory corrective actions within 5 Working Days after receipt.
(d) Notice of Termination for Default: If the Contractor fails to commence satisfactory corrective action within 5 Working Days after receipt of the notice to cure, or to diligently continue satisfactory and timely correction of the default thereafter, then the Owner will recommend to the City Council that the Contractor be found in default of the Contract and upon such finding by the City Council will terminate the Contractor’s right to perform under the Contract by issuing a written notice of termination for default to the Contractor and its Surety; (e) The provisions of this subsection shall be in addition to all other legal rights and remedies available to the Owner.
(f) Responsibilities of the Surety: Upon receipt of the written notice of termination for default, the Surety shall immediately assume all rights, obligations, and liabilities of the Contractor under the Contract. If the Surety fails to protect and maintain the Work site, the Owner may do so and may recover all costs incurred. The Surety shall notify the Owner that it is assuming all rights, obligations, and liabilities of the Contractor under the Contract and all money that is due, or would become due, to the Contractor shall be payable to the Surety as the Work progresses, subject to the terms of the Contract.
(g) Within 15 Working Days of receipt of the written notice of termination for default, the Surety shall submit to the Owner a written plan detailing the course of action it intends to take to remedy the default. The Owner will review the plan detailing and notify the Surety if the plan is satisfactory. If the Surety fails to submit a satisfactory plan, or if the Surety fails to maintain progress according to the plan accepted by the Owner, the Owner may, upon 48 hours written notice, exclude the Surety from the premises, take possession of all material and equipment, and complete the Work in any way the Owner deems to be expedient. The cost of completing the Work by the Owner shall be charged against the Surety and may be deducted from any monies due, or which would become due, the Surety. If the amounts due under the Contract are insufficient for completion, the Surety shall pay the Owner, within 30 Days after the Owner submits an invoice, all costs in excess of the remaining Contract Price.
(h) Payment: The Surety will be paid for completion of the Work in accordance less the value of damages caused to the Owner by the acts of the Contractor.
(i) Termination of the Contract for Convenience.
The OWNER may terminate the Contract if it becomes impossible or impracticable to proceed, or because of conditions or events beyond the control of the OWNER.
i. Notice:
The Owner will issue a written notice of termination for convenience as follows:
Personal delivery, with proof of delivery which may be made by declaration under penalty of perjury by any person over the age of 18 years. The proof of delivery shall show that delivery was performed in accordance with these provisions. Service shall be effective on the date of delivery. Notices given to the Contractor by personal delivery may be made to the Contractor’s authorized representative at the Work site; or
Certified mail addressed to the mailing address of the recipient postage prepaid; return receipt requested. Service shall be effective on the date of the receipt of the mailing.
Simultaneously, the Owner may send the same notice by regular mail.
If a notice that is sent by certified mail is returned unsigned, then delivery shall be effective pursuant to regular mail, provided that the notice that was sent by regular mail is not returned.
ii. Cessation of Work:
Upon receipt, the Contractor shall immediately cease work, except work the Contractor is directed to complete by the Engineer or required to complete for public safety and convenience. The Contractor shall immediately notify Subcontractors and suppliers to immediately cease their work.
iii. Payment:
The Contractor will be paid without duplication for:
1) Work completed in accordance with Contract Documents prior to the effective date of termination for convenience;
2) Reasonable costs incurred in settlement of terminated contracts with Subcontractors, suppliers, and others; and 3) Reasonable expenses directly attributable to termination.
Notice of termination shall be mailed to the City:
Arnoldo Rodriguez
City of Madera
205 West 4th Street
Madera, CA 93637
Notice of Termination shall be mailed to the Contractor:
Daniel Juarez,
Juarez Brothers General Engineering Inc.
17244 El Dorado Drive
Madera, CA 93636
All notices and communications from shall be to City's designated Project Manager or Principal-In-Charge. Verbal communications shall be confirmed in writing. All written notices shall be provided and addressed as soon as possible, but not later than thirty (30) days after termination.
22. Warranty. Contractor warrants to OWNER that all goods, materials, and equipment furnished shall be new, free from faults and defects and of good quality and conform to the requirements of the Contract Documents. Contractor hereby warrants its work against all deficiencies and defects for the period required by the Contract Documents. Unless otherwise stated in the Contract Documents, warranty periods shall begin upon the filing of the Notice of Completion and shall be for one year.
This section shall not limit OWNER’s rights under this Agreement or with respect to latent defects, gross mistakes, or fraud. OWNER specifically reserves all rights related to defective work, including but not limited to defect claims pursuant to California Code of Civil Procedure section 337.15.
23. Compliance with Laws. City shall at all times observe and comply, and shall cause all of its agents, subcontractors, and employees to observe and comply with all with all Federal, State, and local laws, ordinances, regulations, and provisions applicable in the performance of City’s services. Wherever reference is made in this Agreement to standards or codes in accordance with which work is to be performed or tested, the edition or revision of the standards or codes current on the effective date of this Agreement shall apply unless otherwise expressly stated.
24. Attorneys’ Fees/Venue. In the event that any action is brought to enforce the terms of this Agreement, the party found by the court to be in default agrees to pay reasonable attorneys’ fees to the successful party in an amount to be fixed by the Court. The venue for any claim being brought for breach of this Agreement shall be in Madera County or as appropriate in the U.S. District Court for the Eastern District of California, located in the City of Madera.
25. Governing Law. The laws of the State of California shall govern the rights and obligations of the parties under the Agreement, including the interpretation of the Agreement. If any part of the Agreement is adjudged to be invalid or unenforceable, such invalidity shall not affect the full force and effect of the remainder of the Agreement.
26. City’s Authority. Each individual executing or attesting to this Agreement on behalf of the City hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with a duly adopted resolution of the corporation’s articles of incorporation or charter and bylaws; (ii) that this Agreement is binding upon such corporation; and (iii) that Contractor is a duly organized and legally existing municipal corporation in good standing in the State of California.
27. Contractor’s Legal Authority. Each individual executing or attesting this Agreement on behalf of CONTRACTOR hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with such corporation’s articles of incorporation or charter and by-laws; (ii) that this Agreement is binding upon such corporation; and (iii) that CONTRACTOR is a duly organized and legally existing corporation in good standing in the State of California.
28. Remedies for Default. Failure by a party to perform any term, condition or covenant required of the party under this Agreement shall constitute a “default” of the offending party under this Agreement. In the event that a default remains uncured for more than ten (10) days following receipt of written notice of default from the other party, a "breach" shall be deemed to have occurred. Any failure or delay by a party in asserting any of its rights and remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default.
29. Independent Contractor. In performance of the work, duties, and obligations assumed by the Contractor under this Agreement, it is mutually understood and agreed that the City, including any and all of City’s officers, agents and employees will, at all times, be acting and performing as an independent contractor, and shall act in an independent capacity and not as an officer, agent, servant, employee, joint ventures, partner, or associate of City. Furthermore, City shall have no right to control or supervise or direct the manner or method by which City shall perform its work and functions. The City shall comply with all applicable provisions of law and the rules and regulations, if any, of governmental authorities having jurisdiction over the subject matter hereof.
Because of its status as an independent contractor, CONTRACTOR shall have absolutely no right to employment rights and benefits available to City employees. City shall be solely liable and responsible for providing to, or on behalf of, its employees, all legally required employee benefits. In addition, City shall be solely responsible and hold City harmless from all matters relating to payment of City’s employees, including compliance with Social Security, withholding and all other regulations governing such matters. It is acknowledged that during the term of this Agreement, City may be providing services to others unrelated to City or to this Agreement.
30. Sole Agreement. This instrument constitutes the sole and only Agreement between City and CONTRACTOR in connection to the Project and correctly sets forth the obligations of the City and CONTRACTOR to each other as of its date. Any Agreements or representations in connection with the Project, not expressly set forth in this instrument are null and void.
31. Assignment. Neither the CONTRACTOR nor City will assign its interest in this Agreement without the written consent of the other.
32. Binding Agreement. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
33. Scope of Work. MEASUREMENT OF QUANTITIES: Unless otherwise specified, quantities of work shall be determined from field measurements by the Engineer in accordance with Section Nine of the State Standard Specifications. CONTRACT PAYMENTS The Contract payment for the specified items of work as set forth in the Bid Schedule shall be full compensation for furnishing all labor, materials, tools, equipment, transportation, services, documentation, and incidentals and for doing all work involved as required by the Plans and Specifications, Special Provision, State Standards, Legal and Safety Provisions and all other Provisions of the Contract Documents.
All materials and/or products provided for this project shall comply with City of Madera and/or Caltrans Standard Plans and Specifications as indicated by the various bid items.
Certificates of Compliance indicating type of materials and source shall be provided to the City Engineer.
Full compensation for all expenses involved in conforming to the requirements for measuring materials or work shall be considered as included in the unit or lump sum prices paid for the materials and work being measured, and no additional compensation will be permitted.
34. Description of Bid Items. The descriptions below are general in nature and do not include estimated quantities. See plans and bid summary for estimated quantities.
Estimated quantities are provided as a courtesy only. Actual numbers and quantities of symbols on plans prevail.
Demolition & Site Preparation
Bid Item A.1 – Construction Fencing:
The lump sum bid for this item shall include all costs for construction fencing, labor, materials, tools, equipment, incidentals and for doing all the work, including but not limited to installation and removal from the site necessary for completion of the work.
Bid Item A.2 – Removal of Existing Wood Fence:
The linear foot price bid for this item shall include all costs for removal of existing wood fence. The item also includes labor, disposal, and other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item A.3 – Tree Protection Fencing:
The lump sum bid for this item shall include all costs for tree protection fencing, labor, materials, tools, equipment, incidentals and for doing all the work, including but not limited to installation and removal from the site necessary for completion of the work.
Bid Item A.4 – Site Preparation (Clearing, Grubbing & Disposal):
The lump sum bid for this item shall include all costs for vegetation removal, soil clearing, grubbing and removal. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item A.5 – Site Grading (Rough/Fine):
The lump sum price bid for this item shall include all costs for rough grading and fine grading (grading of landscape areas to fence footing elevations). The item also includes labor, equipment, materials, and all other work required by the drawings and specifications which is not specifically set forth in the Bid Form as a pay item.
Fencing and Gates
Bid Item B.1 – 6’ High Tubular Steel Fence:
The linear foot price bid for this item shall include all costs for purchase and installation of ornamental fence panels, posts and footings, and all hardware and fasteners in locations indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item B.2 – 6’ High Single Swing Tubular Gates (Pedestrian):
The unit price bid for this item shall include all costs for purchase and installation of ornamental swing gates, posts and footings, and all gate hardware and fasteners, including self-closing hinges and locking lever handles in locations indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item B.3 – 6’ High Double Swing Tubular Steel Gate (Vehicular):
The unit price bid for this item shall include all costs for purchase and installation of ornamental swing gates, posts and footings, and all gate hardware and fasteners, including self-closing hinges and locking lever handles in locations indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Miscellaneous
Bid Item C.1 – Mobilization/De-Mobilization (NTE 5%):
Mobilization and Demobilization will be paid for on a lump sum basis and is limited to 5% maximum of the total bid cost. The lump sum bid for this item shall include full compensation for conforming to these requirements, temporary fencing (coordination & prior approval of City needed), labor, materials, tools, equipment, incidentals and for doing all the work involved in moving on and off the project site necessary for completion of the work.
Payment for 50 percent of Mobilization and Demobilization or 2.5% of Total Base Bid, whichever is less, shall be made at the time of the first progress payment after the Contractor has purchased and submitted the required bonds and insurance as required by the City. The remaining balance shall be made at the time of the final progress payment after project acceptance by City.
Bid Item C.2 – Bonding:
General Conditions will be paid for on a lump sum basis. The contract lump sum price paid for General Conditions shall include full compensation for conforming to these requirements, furnishing all the fees, permitting, bonding, labor, surveying, staking, and materials for doing all the work involved in administration and oversight of the project necessary for completion of the work as specified in the General Provisions, these Project Specifications and as directed by the City.
IN WITNESS WHEREOF the parties hereto have executed or caused to be executed by their duly authorized officials, this Agreement in THREE copies, each of which shall be deemed an original on the date first above written.
CITY OF MADERA (OWNER)
By: _________________________________
Cece Gallegos, Mayor
APPROVE AS TO FORM:
By: __________________________________
Shannon L. Chaffin, City Attorney
ATTEST:
By: __________________________________
Alicia Gonzales, City Clerk
CONTRACTOR
By: _________________________________
Contractor (signature)
_________________________________
Printed Name and Title
___________________________
Federal Tax I.D. No.
___________________________
Contractor License Number
___________________________
DIR Registration Number
NOTE: This Notary Acknowledgment on the following page is required for verification of Contractor’s signature.
Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of: ______________________________)
On ______________, 2025 before me, ______________________________________ (insert name and title of officer)
Personally appeared __________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature ___________________________________ (Seal)
Attachment A
INSURANCE REQUIREMENTS FOR
CONSTRUCTION AND SERVICES CONTRACTS
Without limiting Contractor’s indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide, and continuously maintain at its own expense during the term of the Agreement, and shall require any and all Subcontractors and Subconsultants of every Tier to obtain and maintain, policies of insurance of the type and amounts described below and in form satisfactory to the City.
Minimum Scope and Limits of Insurance
Contractor shall maintain limits no less than:
$2,000,000 General Liability (including operations, products and completed operations) per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability. Coverage shall be at least as broad as Insurance Services Office (ISO) Commercial General Liability coverage form CG 00 01. General liability policies shall be endorsed using ISO forms CG 20 10 and CG 20 37 to provide that the City and its officers, officials, employees and agents shall be additional insureds under such policies.
$2,000,000 Automobile Liability combined single limit per accident for bodily injury or property damage at least as broad as ISO Form CA 00 01 for all activities of Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles.
Automobile Liability policies shall be endorsed to provide that the City and its officers, officials, employees, and agents shall be additional insureds under such policies.
Worker’s Compensation as required by the State of California and $1,000,000 Employer’s Liability per accident for bodily injury or disease. Contractor shall submit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers.
Maintenance of Coverage
Contractor shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, his agents, representatives, employees, subcontractors or subconsultants as specified in this Agreement.
Proof of Insurance
Contractor shall provide to the City certificates of insurance and endorsements, as required, as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the City prior to commencement of performance.
Current evidence of insurance shall be kept on file with the City at all times during the term of this Agreement. Agency reserves the right to require complete, certified copies of all required insurance policies, at any time.
Acceptable Insurers
All insurance policies shall be issued by an insurance company currently authorized by the Insurance commissioner to transact business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and a Financial Size Category Class VII (or larger), in accordance with the latest edition of Best’s Key Rating Guide.
Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees, and volunteers, or shall specifically allow Contractor, or others providing insurance evidence in compliance with these specifications, to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City and shall require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.
Enforcement of Contract Provisions (non estoppel)
Contractor acknowledges and agrees that any actual or alleged failure on the part of the Agency to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City, nor does it waive any rights hereunder.
Specifications not Limiting.
Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If Contractor maintains higher limits than the minimums required above, the entity shall be entitled to coverage at the higher limits maintained by Contractor.
Notice of Cancellation
Contractor agrees to oblige its insurance agent or broker and insurers to provide to the City with thirty (30) calendar days’ notice of cancellation (except for nonpayment for which ten (10) calendar days’ notice is required) or nonrenewal of coverage for each required coverage.
Self-insured Retentions
Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the City’s Risk Manager.
Timely Notice of Claims
Contractor shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional Insurance
Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgement may be necessary for its proper protection and prosecution of the Work.
Alfonso Juarez
CFO
To:
Project Name: Frank Bergon Senior Center Fencing
Location:
City of Madera
Madera, CA
Date: January 27, 2025
BID PROPOSAL
17244 El Dorado License No. 956804
Madera, CA 93636 SB No. 2029586
Phone: (559) 908-2540 DVBE No. 2029586
DIR No. 1001118160
Scope of Work:
Respectfully,
ITEM ITEM DESCRIPTION UOM QTY UNIT PRICE SUBTOTAL TOTAL A1 Construction Fencing LS 1 $ 3,303.00 $ 3,303.00
A2 Removal of Existing Wood Fence LS 1 $ 2,000.00 $ 2,000.00 A3 Tree Protection Fencing LS 1 $ 500.00 $ 500.00
A4 Site Preparation (Clearing, Grubbing, & Disposal) SF 788 28.76 $ $ 22,662.88 A5 Site Grading (Rough/Fine) LS 1 $ 36,634.28 $ 36,634.28 $ 65,100.16
B1 6' High Tubular Steel Fence LF 382 142.00 $ $ 54,244.00 B2 6' High Single Swing Tubular Gates (Pedestrian) EA 2 $ 1,080.00 $ 2,160.00 B3 6' High Double Swing Tubular Steel Gate (Vehicular) EA 1 $ 5,748.00 $ 5,748.00 $ 62,152.00
C1 Mobilization/De-mobilization (NTE 5%) LS 1 $ 6,362.60 $ 6,362.60 C2 Bonding LS 1 $ 4,008.00 $ 4,008.00
$ 10,370.60
$ 137,622.76 $ 137,622.76
BID SCHEDULE A
BID SCHEDULE B
BID SCHEDULE C
BID SCHEDULE A TOTAL
BID SCHEDULE B TOTAL
BID SCHEDULE C TOTAL
Attachment B
ATTACHMENT 2
RESOLUTION NO. 25-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA, CALIFORNIA AMENDING THE CITY’S FISCAL YEAR 2024/25 ADOPTED BUDGET FOR $65,172
WHEREAS, the City Council previously adopted a City-wide Budget for 2024/25 Fiscal Year; and
WHEREAS, on January 15, 2025, the Council approved an additional Community development Block Grant appropriation of $65,172.23 towards the Frank Bergon Senior Center (FBSC) Improvements Project; and
WHEREAS, the additional appropriation came from unspent/unobligated Community Development Block Grant (CDBG) funding, approved under Resolution No. 25-12; and WHEREAS, the budget amendment to the City-wide Budget for the 2024/25 Fiscal Year, listed in Exhibit A, attached hereto, is necessary to account for the additional CDBG appropriation to cover FBSC Improvement costs.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF MADERA hereby resolves, finds, determines and orders as follows:
1. The above recitals are true and correct.
2. The appropriations for the items listed in Exhibit A, attached hereto, are approved.
3. A signed copy of this Resolution shall be placed on file in the office of the Director of Financial Services, who shall prepare the entries necessary to reflect budget changes identified in the City's accounting system.
4. This Resolution is effective immediately upon adoption. * * * * * * * *
• MADERA COUNTY EDC
1!!!!!!!l �� ECONOMIC OEVELOPMENT COMMISSION
·�
REPORT TO THE MADERA CITY COUNCIL
Meeting Date: February 5, 2025
To: Honorable Mayor and City Councilmembers
From: Kristina Gallagher, Executive Director
Madera County Economic Development Commission
SUBJECT:
City contribution towards the Madera County Economic Development Commission (EDC) for Fiscal Year (FY) 2025/26 in the amount of $194,614.51
RECOMMENDATION:
The EDC recommends the City Council (Council) adopt a minute order approving the 2025/26 Basic Service Level Budget as submitted.
SUMMARY:
The City, along with the County of Madera and the City of Chowchilla, established a Joint Powers Authority (JPA) in 1968 to create an agency with the expressed purpose of attracting and establishing industry in the region. The EDC is seeking funding to continue with its core mission for the upcoming fiscal year.
DISCUSSION:
History & Board Composition
The EDC was created by the County of Madera and the cities of Madera and Chowchilla through a JPA in 1968. On an annual basis, the EDC approaches each respective agency and outlines budget needs and contribution amounts. In an effort to identify needs, EDC staff works collaboratively with its Board of Commissioners, comprised of 13 members from local chambers, industry and public utility to plan the upcoming year's strategy and efforts. Budget needs are more narrowly defined by the EDC Executive Committee, which is comprised of 5 of the 13 aforementioned Board of Commissioners.
Role of the EDC
The EDC, in partnership with the City, works tirelessly on:
1. Attracting new businesses, particularly job creation
2. Assisting existing businesses to expand, including identifying and providing loans
3. Retention of existing businesses that are seeking and relocating outside of the region
4. Serving as a liaison between the City and businesses Agenda Item: E-1
REPORT TO CITY COUNCIL
Approved by: Council Meeting of: February 5, 2025
Agenda Number: ___________
________________________________
Joseph Hebert, Parks & Community Services Director
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Parks & Community Services Department Fiscal Year 2024/25 Quarter 2 Recap RECOMMENDATION:
This report is submitted to provide the City Council with an informational report on the status of the Parks & Community Services (PCS) Department Fiscal Year 2024/25 Quarter 2 Recap SUMMARY:
Staff is providing an update on Fiscal Year 2024/25 Quarter 2 (October 2024 – December 2024) accomplishments, progress, and ongoing efforts of the PCS Department. This informational update covers all divisions within the PCS Department.
DISCUSSION:
The PCS Department delivers a wide range of direct services to the public and is divided into three major operational divisions: Administration, Recreation & Community Services, and Parks Maintenance. Together, these divisions provide high-quality recreational pursuits, preservation of parks and open space areas, entertainment, and leisure services to community members of all ages.
During Quarter 1 of Fiscal Year 2024/25, staff is please to share the following highlights of accomplishments and progress work, presented in no particular order:
1. Administration
Submitted closeout reports and final reimbursement requests for the Clean California Local Grant Program. Thanks to the $832,350 grant, the City was able to do the following:
E-2
Cover $200,000 towards litter abatement efforts in the Fresno River. This allowed for some General Fund relief for contracted services of the river cleanup efforts.
Restore the entire surface of the Vernon McCullough River Trail. This was over 204,211 square feet.
Installation of a new playground with safety perimeter fencing at Riverview Park, augmenting the City’s play structures available, swings, and park amenities.
Installed 5 new motion-capable exercise equipment stations in a highly utilized section of the Vernon McCullough River Trail, to provide a safe, clean space for residents to be active.
Installed 34 new trash receptacles along the trail and 2 at Riverview Park to increase the community’s ability to dispose of trash and litter more appropriately.
Conducted an anti-littering campaign that included decals on the new trash receptacles and incorporated selected artwork from Madera Unified School District students in some of the receptacles.
Executed Amendment No. 2 with West Coast Arborist, Inc. (WCA) for citywide tree management and maintenance services. This will allow the City to maintain services through November 3, 2026.
Executed a Lease Agreement for facility utilization of the Millview Community Center with the Community Action Partnership of Madera County (CAPMC). This Lease allows CAPMC to further continue the Head Start program out of the site, extending the Lease through May 31, 2027.
Secured agreements with the California Conservation Corps for assistance with the following:
River cleanup efforts, specifically vegetation and bush growth along the Fresno River
Citywide tree trimming efforts
Citywide landscape maintenance efforts
Researched and presented information regarding the publicly proposed splash pad project by community members. This included researching potential costs and design factors of splash pads, logistics and other matters. Conducted the grand opening event of Rancho Santa Fe Park on Saturday, November 23, 2024. Although the weather initially called for severe rain, the weather the day of the event turned out beautiful, with a larger turnout than expected. Rancho Santa Fe is the City’s newest park.
2. Parks Maintenance
Added additional improvements at McNally Park, with the completed installation of musical equipment. The installation includes free-standing musical instruments on a surfaced play area.
The Parks Maintenance office area underwent renovations with the installation of new furniture to enhance and maximize the space. The new furniture includes conference room-style tables and chairs, new overhead storage cabinets, and storage cases.
Sunrise Rotary Sports Complex closed its soccer fields for maintenance. This includes reseeding the fields that see major wear and tear from spring to late summer, with the various leagues and usage the park gets. This is a well-deserved time off for the fields to get the maintenance they need to be ready for 2025. An application for Community Development Block Grant funds was submitted on December 13, 2024, requesting a total of $413,000. The amount requested is intended to cover needed improvements at the Centennial Park Pool Complex, such as improvements to the deck, drainage repairs, new canopy, reconstruction of pool equipment and chemical room, and repairs to the main building. One new fountain was added at the corner of Cleveland Avenue and Granda Drive. Staff completed replacement of three trash cans at Sunrise Rotary Sports Complex.
Three trash cans were repaired with new liners at the Vernon McCullough River Trail and Centennial Park.
Successfully hired 5 Park Aides to support division duties and responsibilities. Since December 15, 2024, Parks Maintenance staff has taken on the additional duties of providing janitorial services for the following sites, as the City worked on finalizing a new agreement with a new vendor:
Police Department
Intermodal Transportation
Transit Center (Independence Drive)
City Hall
Engineering Department building
Specifically related to capital improvement projects, the following should be noted:
Sunrise Rotary Sports Complex New Playground Installation Construction continued throughout September – December at the playground. Staff had to order several items that were missing during the course of installation. These were smaller sized items, such as spindles and specific bolts.
On December 19, 2024, a Certified Playground Safety Inspector conducted an inspection of the completed playground. There was one finding that the Inspector informed staff about at the site before a Certificate of Compliance could be issued.
Frank Bergon Senior Center Safety Perimeter Fence
Updated estimates were received for the completion of the project. Staff has worked on an agreement to present to Council in early 2025.
3. Recreation
The John Wells Youth Center (JWYC) and Pan-American Center (PAC) have been open for drop-in programming for youth in the afternoons. Over 567 duplicated youth attended the JWYC.
Over 826 duplicated youth attended the PAC.
Both centers held special programming hours during December to accommodate the school winter break.
Secured a Consultant Services Agreement with Madera Unified School District (MUSD) to conduct a Winter Enrichment STEAM Camp, estimated to serve over 70 students
The Agreement was approved by Council on November 20, 2024. The camp is scheduled for January 6 -10, 2025.
The Agreement is not to exceed $27,552.50, to be reimbursed by MUSD.
4. Aging Services
Programming that occurred in Quarter 2 of Fiscal Year 2024/25 includes:
Tai Chi Weekly Day Trips Board Games/Bingo
Tech Class Karaoke Bailoterapia
Pickleball Class Knit n Knots Passport Travel
Chair Yoga Aqua Dash Arts & Crafts
The Pan-American Center was open for programming Monday through Friday from 9 am through 2 pm.
During October, 1,253 duplicated participants visited the center. During November, 1,121 duplicated participants visited the center. During December, 1,104 duplicated participants visited the center. The Frank Bergon Senior Center (FBSC) was open for programming on Tuesday, Wednesday, and Thursday from 9 am through 2 pm.
During October, 576 duplicate participants visited the center. During November, 340 duplicated participants visited the center. During December, 523 duplicated participants visited the center. Special events related to Aging Services included:
Fresno Fair Senior Day Trip
Halloween Costume Contest/Luncheon
Halloween Senior Dinner Dance
Thanksgiving Luncheon and Food Drive
Harvest Senior Dinner Dance
Listen and Learn Session at FBSC, facilitated by San Diego State University Center for Excellence in Aging Center
Youth Coat and Blanket Drive at both sites
Breakfast with Santa
Christmas Ball Dinner Dance
5. Sports
Fall T-Ball and Coach Pitch enrolled 141 kids.
Tiny Tikes soccer enrolled 40 kids.
Youth Basketball enrolled 170 kids.
Tiny Tikes Multi-Sport enrolled 29 kids.
Adult Softball enrolled 168 adults.
A total of 14 softball teams participated.
Adult Volleyball open recreation programming hours hosted over 270 duplicated adults.
The Sports division is looking forward to new programs coming soon:
Middle School Basketball League
Adult Volleyball Tournaments
Youth Special Needs Sports Camp
6. Community & Recreation Centers (Facilities)
Utilization of the Frank Bergon Senior Center
6 recorded rentals during October – December 2024.
Utilization of the John Wells Youth Center
6 recorded rentals during October – December 2024.
The Madera Omega LEO Club hosted a Basketball Exhibition Game on November 23, 2024. The game was between Madera Omega LEO Club and the Valley Children’s Adaptive Sports Fresno Wheelers.
Utilization of the Pan-American Center
9 recorded rentals during October – December 2024.
The Madera County Elections Office held a polling location from November 2nd through November 5th.
Madera County Behavioral Health held an Annual Staff Appreciation on December 6, 2024.
Utilization of the Youth Hut
1 recorded rental during October – December 2024.
7. Special Events
Halloween Movie Night at Lions Town & Country Park took place on Friday, October 18, 2024, with a special screening of Hocus Pocus. This was the winning movie as voted on by the community. Over 115 people attended. Madera Eats teamed up with the Recreation division for a thrilling evening of delicious food and festive trick-or-treating at Lions Town and Country Park. The event took place on Saturday, October 19, 2024. There were food vendors, craft vendors, resource booths, games, and prizes for best costume. It is estimated that 300 people attended.
Participated in four Walk to School events, partnering with the Madera County Department of Public Health and Madera Unified School District. Three of the four events were held at City parks.
In conjunction with the Madera County Tourism Alliance, participated in the Pomegranate Festival on November 2, 2024, at the Madera Fairgrounds.
Approximately 7,500 people were in attendance and the City’s Kids Zone made over $4,417, in revenue.
Holiday Movie Night at the John Wells Youth Center took place on Saturday, December 14, 2024, with the special screening of Dr. Seuss’ How the Grinch Stole Christmas. This was the winning movie as voted on by the community. Madera East joined with the Christmas Lights Parade on December 4, 2024. Four food vendors participated.
The Jolly Trolley Lights Tour took place on the evening of Tuesday, December 17, 2024. This event was a huge success, as the event was fully booked, and required 10 City buses to meet demand! The attendees got to tour some of the City’s most decorated holiday display homes.
The City crowned Steven Fabionar and Leticia Ceballos as the best-decorated house for the 2nd consecutive year.
In 2024, the last event was Winter Wonderland, on December 20, 2024. This is a holiday-themed event filled with games and crafts, concession items, and raffle prizes. Attendees also have a chance to take a picture with Santa and Grinch! FINANCIAL IMPACT:
The preparation and presentation of this informational report does not result in any significant financial impact. While there are costs associated with the organization and execution of the community events referenced in this report, these expenses have been accounted for in the City's Fiscal Year 2024/25 budget. All activities and events were planned in alignment with the City's financial resources and were incorporated into the approved budget to ensure fiscal responsibility. As such, no additional appropriations or adjustments to the current budget are necessary at this time.
ALTERNATIVES:
This report is for informational purposes only and no formal action is being requested.
ATTACHMENTS:
No attachments.
Madera City Council Meeting
February ϱ, 202ϱ
Agenda Item: E-ϯ
Select Recipient for the Proclamation in the month of February Recommendation: Request for Council's selection of a recipient for the Proclamation Recognizing Black History Month (Report by Alicia Gonzales) There is no written report for this item.
REPORT TO CITY COUNCIL
Approved by:
_________________________________
Michael Lima, Director of Financial Services
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:
Informational Report on Solar Project Credit Payment of $1,966,669.83 RECOMMENDATION:
None. This report is informational only.
SUMMARY:
In partnership with Engie Services U.S., the City initiated the construction of multiple solar systems to service City facilities. One of the two new solar systems at the Wastewater Treatment Plant (WWTP) started construction in June 2021 and became operational in October 2023. This system provides electricity to various City facilities, including the WWTP, City Hall, and Police Headquarters. The City issued bonds to pay for the facility’s construction, while construction on the second Engie solar system at the WWTP remains ongoing. The third, existing solar system at the WWTP, constructed in c. 2014, is unrelated to the Engie project.
In August 2022, the Inflation Reduction Act (IRA) was signed into law. Part of the IRA authorized credits for solar power systems that were both financed with debt and began construction prior to January 2023. Working with the City’s bond counsel, Jones Hall, the City submitted a claim in May 2024 with the Internal Revenue Service (IRS) for solar credits offered under the IRA. On January 2, 2025, the City received a $1,966,669.83 solar credit payment from the IRS. The monies received have been allocated to all the City funds contributing to the annual debt service payment on the solar power system.
DISCUSSION:
To ensure energy consistency and manage electric utility costs, the City began exploring solar energy systems to power its facilities. After careful study, the City partnered with Engie Services, U.S. to develop a solar facility at the WWTP. Prior to this partnership, the City had already Council Meeting of: February 5, 2025
Agenda Number: ___E-4____ _
constructed a solar system at the WWTP that solely provided power to the WWTP. Thus, there are now three solar systems at the WWTP, two of which are operational. This subject solar system, while physically located at the WWTP, supplies energy to various City facilities, including the WWTP, City Hall, Police Headquarters, and water wells. In contrast, the other two solar systems are dedicated to the WWTP.
The City issued $19.4 million in bonds to fund the project in December 2019. Bond proceeds were initially used to cover design costs and later construction. Construction commenced in June 2021, with the initialization of the system in October 2023. The completed system is designed to produce 5.9 MW of electricity annually.
In August 2022, President Biden signed the IRA into law. The IRA provided financial incentives for solar projects. Under the IRA, credits were authorized for solar power systems financed with debt and began construction before January 2023. The IRS administered these credits through an application process.
In January 2024, the City’s bond counsel, Jones Hall, informed the City about the IRA’s solar power system credits and offered to assist in the application process. The City retained Jones Hall in March 2024 to facilitate the application submission. Jones Hall’s fee for this service was $45,000. With the assistance of Jones Hall, City staff applied to the IRS in May 2024.
On January 2, 2025, the City received a payment of $1,966,669.83 from the IRS for the solar credit application it filed in May 2024. Staff allocated these monies across City funds based on their contribution to the annual solar power system bond payment.
Staff anticipates receiving another solar credit payment from the IRS in approximately one year.
The amount of that payment has yet to be determined.
FINANCIAL IMPACT:
Considering that various funds paid for the subject system, staff applied the $1,966,669.83 solar credit in proportion to the fund that initially paid for the solar project. Table 1 outlines the dollar amount credited per fund.
It is important to note that these credit proceeds were not included in the FY 2024/2025 Adopted Budget. Instead, staff plans to include these proceeds in the FY 2025/2026 Proposed Budget.
However, Council has the discretion of appropriating these proceeds in the FY 2024/2025 Amended Budget should it choose to do so.
Table 1: Rebate per fund
Fund Amount
Airport $54,988.93
Drainage $31,279.53
Facilities $400,702.81
General Fund $262,298.81
Madera Transit Center $18,515.58
Measure K - Police $10,148.35
Parking $3,324.46
Sewer $417,527.00
Water $767,884.36
Total $1,966,669.83
ALTERNATIVES:
There are no alternatives presented as this item is informational only.
ATTACHMENTS:
None