Planning Commission Ad-Hoc Committee
On July 10, 2019, the Planning Commission established an Ad-Hoc Subcommittee to tour Brookfield Residential’s New Haven community in Ontario to visit a project with similar housing types/design as proposed as part of the Project. Commissioners Madrid and Thomas were appointed to the Ad-Hoc Committee and toured the Ontario project with staff in August 2019.
Early Iterations of the Currently Proposed Land Use Map The currently proposed Project application, submitted June 2021, was originally envisioned by the Developer as a Business Park supporting light industrial, logistics, and supply chain businesses. Later residential uses were introduced along the easterly side of the Project site.
Throughout the planning process, the plan became more refined and diverse, and the following uses were added:
•Additional residential
•Commercial flex space along SR-74
•Additional commercial retail along SR-74
•Modification of industrial to business park west of/adjacent to Heritage High School •An elementary school in the center of the residential area •Greenbelts along the southerly edge
•A public facility site in the southwesterly corner
•Multi-family and agri-business uses south of/adjacent to Heritage High School •McLaughlin Road east-west through the Project site
2023 Ontario Ranch Site Visit
In May 2023, City staff traveled to Ontario, California to meet with Project Applicant team members to tour and discuss the Ontario Ranch master-planned development, which contained many similar elements to what is proposed under this Project, including master-planned residential communities, open space and recreational amenities, and commercial-retail development. The tour also included multiple visits to large-scale industrial developments. This tour was used to better understand and plan for the eventual end product that is envisioned for this Project site.
DISCUSSION
General Project Characteristics
The proposed Project would facilitate the development of the 590.3-acre Project site as a mixed- use, master-planned community through the approval of the MVSP. The planned community would provide economic development and jobs to the City, improve the ratio of jobs to housing in Menifee, deliver a mix of uses, and maintain the maximum residential unit count of 1,718 that was previously approved for the Project site by SP 301.
The MVSP Land Use Plan divides the 590.3-acre property into 13 “Planning Areas”. The southern and eastern portions of the MVSP will accommodate the 1,718 housing units, providing an array of housing types and neighborhood amenities, including greenbelts, trails, a public sports park and aquatics center, open space and an elementary school site. The northern and western Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 7
Menifee Mayor and City Council
February 7, 2024
Page
393 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
portions of the MVSP area are reserved for Business Park, Commercial Business Park, and Commercial areas that will allow uses which foster economic activity and promote job growth. A Civic Node is positioned in the southwest portion of the MVSP site where the City may locate a fire station, transit stop, and/or other needed public or quasi-public uses.
The Project includes improvements to existing roadways along the Project frontages, utility connections, landscaping, multi-use paths, and construction of a non-vehicular bridge, as well as offsite roadway improvements proposed to address circulation issues to implement the level-of- service (LOS) goals set forth in the Circulation Element of the City’s General Plan.
Specific Plan
The Specific Plan is a regulatory document that establishes the land use designations, building intensities, development standards (zoning), design guidelines, and implementation procedures for buildout of the 590.3-acre Project site. In addition, infrastructure improvements such as roads, water, wastewater, and storm water drainage systems are addressed by the Specific Plan to ensure their proper sizing and timely installation. The Specific Plan is organized into the following seven sections:
•Section 1: Introduction
•Section 2: Land Use Plan
•Section 3: Mobility and Infrastructure Plans
•Section 4: Development Standards
•Section 5: Landscape Standards
•Section 6: Architectural Guidelines
•Section 7: Administration and Implementation
During preparation of the MVSP, many factors were considered to ensure a thoughtfully designed and master planned community. The Specific Plan utilized the City of Menifee’s General Plan and the City’s Design Guidelines as a starting point and establishes the following as the overall objectives of the Specific Plan:
•Implement the City of Menifee’s General Plan, which envisions that the geographic area governed by the MVSP will be developed into a high-quality master planned community that demonstrates consistency with the City’s General Plan policies. •Plan for the development of a contemporary mixed-use community that internally balances housing needs and community amenities with job-producing businesses that are economically viable in a 21st century economy.
•Locate businesses that rely on transportation efficiency along Menifee Road and SR-74, which are established truck routes.
•Ensure that Business Park, Commercial-Business Park, and Commercial areas are designed as places where businesses can prosper, attract economic investment to the City of Menifee, and provide goods, services, and job opportunities to the surrounding community and region.
•Concentrate residential uses in the eastern portion of the property and provide opportunities in the Residential areas for supportive uses that are important to households such as a K-5 school, green spaces, recreational amenities, and agri-commercial uses such as a community farm.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 8
Menifee Mayor and City Council
February 7, 2024
Page
394 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
•Physically separate Residential, Commercial Business Park, and Business Park areas through traditional and creative means such that the uses are complementary and supportive while limiting real and perceived conflicts associated with the adjacency of these uses.
•Create gathering spaces and encourage outdoor movement in the form of parks, paseos, streetside green spaces, and outdoor employee amenity areas. •Position a public facility/civic node in a convenient location that provides opportunity for a new fire station, a new rail corridor transit stop, and other public or quasi-public uses. •Preserve Granite Hill in permanent open space, while allowing trails and other non- invasive activities that will protect the tangible and intangible assets of the landform. No development or fuel modification is permitted within Planning Area 7B, except as necessary for the construction of Briggs Road.
•Provide a comprehensive circulation network with integrated mobility options by introducing traffic calming features in the Residential areas, by providing pedestrian and bicycle paths and amenities throughout the community, and by providing a non-vehicular bridge connection to the Heritage Lake community to the south. •Identify and implement infrastructure improvements to provide adequate and reliable water, reclaimed water, sewer, and storm drain service for the community. •Create a cohesive architectural and landscape theme that ties the various components of the community together to appear as a unified, defined and recognizable place.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 9
Menifee Mayor and City Council
February 7, 2024
Page
395 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Conceptual Land Use Plan
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 10
Menifee Mayor and City Council
February 7, 2024
Page
396 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Illustrative Site Plan
The Illustrative Site Plan is presented below. This is one of many potential building scenarios for the Specific Plan. However, this plan was used to visualize how the community could be developed and to evaluate how the development standards contained within the Specific Plan would function under a test-case scenario. As noted on the image below, the Illustrative Site Plan is conceptual only. The actual building footprints, uses, and site plan configurations will all be evaluated as future implementing projects are brought forward for review and approval.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 11
Menifee Mayor and City Council
February 7, 2024
Page
397 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Illustrative Site Plan
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 12
Menifee Mayor and City Council
February 7, 2024
Page
398 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Circulation
Vehicular Circulation
The Vehicular Circulation Plan, contained within the Specific Plan, involves frontage improvements to the perimeter roads, including SR-74, Menifee Road, and Briggs Road. The internal street system reinforces the concept of traditional residential neighborhood design in the easterly portion the Specific Plan and ease of access for business and commerce in the northerly and westerly portions of the Specific Plan.
The residential and non-residential components of the community only share internal vehicular access along McLaughlin Road to maximize the separation of vehicles accessing residential neighborhoods from trucks, service vehicles, and employees accessing the business park, commercial-business park, and commercial areas in the westerly and northerly portions of the Specific Plan area as much as feasible. In addition, a roundabout is proposed at the intersection of the Residential Center Spine Road and McLaughlin Road to prevent trucks from traveling eastbound past the roundabout.
Vehicular access into and through residential neighborhoods will occur by Residential Collector Streets and the eastern segment of McLaughlin Road connecting to Briggs Road. An internal Central Spine Street is envisioned as a main internal north/south street connecting residential neighborhoods, parks, and the K-5 school site in Planning Area 6. Primary vehicular access to the Business Park, Commercial-Business Park, and Commercial areas will occur by Malaga Road and the westerly segment of McLaughlin Road, which connect with SR-74 and Menifee Road, respectively.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 13
Menifee Mayor and City Council
February 7, 2024
Page
399 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Vehicular Circulation Plan
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 14
Menifee Mayor and City Council
February 7, 2024
Page
400 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
The Project includes two sets of off-site improvement areas. The first set of off-site improvements includes improvements to existing roadways along the Project frontage (e.g., Menifee Road, SR- 74, and Briggs Road), utility connections (e.g., water, sewer, stormwater, electricity, internet, and natural gas), landscaping, and construction of a non-vehicular bridge to connect the Specific Plan site to the Heritage Lake community to the south (up to 59.0 acres total).
In addition, a second set of off-site roadway improvements are proposed to address circulation issues and to implement the LOS goals set forth in the Circulation Element of the City’s General Plan. These roadway improvements, which include widening and additional turn lanes as required, include Matthews Road/Case Road (between Menifee Road and Ethanac Road), McLaughlin Road (between Matthews Road/Case Road and Menifee Road), widening McCall Boulevard (between Encanto Drive and Menifee Road), and enforcing diversion of southbound project truck traffic to the Ethanac Road interchange using the McLaughlin Road extension to Matthews Road/Case Road. Roadway improvements include possible relocation of overhead and underground utility infrastructure, additional road signage, traffic rerouting, road resurfacing and expansion, and walkways and road lighting. These improvements would result in these roadway segments being built out to their ultimate configurations as identified in the City’s General Plan Circulation Element (Circulation Element Exhibit C-3).
Offsite Improvement Area
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 15
Menifee Mayor and City Council
February 7, 2024
Page
401 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Bus and Rail Transit Options
There is existing Riverside Transit Agency (RTA) service along SR-74. Also, the City of Menifee General Plan identifies potential future transit service along Menifee Road. At the time that road improvement plans or subdivision maps are filed for development adjacent to these roads, locations of bus stops or turnouts will be determined in consultation with RTA and the City.
At minimum, a bus turnout location, which provides a designated area on the side of the road for buses to pull out of the flow of traffic to pick up and drop off passengers shall be provided near the intersection of SR-74 and Malaga Road located adjacent to Planning Area 13.
Additionally, Planning Area 9 is designated as a 5.3-acre Public Facility – Civic Node (PF) site.
Planning Area 9 is located next to a Riverside County Transportation Commission (RCTC) rail corridor and is the potential location of a passenger stop for trains using this rail corridor.
Bicycle and Pedestrian Mobility
The MVSP is designed with a comprehensive greenbelt, sidewalk, bicycle, and multi-purpose trail system that provides ease of mobility throughout the community. Connectivity will be provided to and through the residential planning areas, as well as to the parks, amenity areas, the elementary school site, civic facilities, and to pedestrian and bicycle routes extending beyond the Specific Plan’s boundary. The mobility plan also makes use of the greenbelts in Planning Areas 8A and 8B and the Granite Hill conservation area in Planning Area 7B. The non-vehicular network ensures that residents, employees, and visitors have opportunities to travel by foot and bike in different settings.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 16
Menifee Mayor and City Council
February 7, 2024
Page
402 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Pedestrian Mobility Plan
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 17
Menifee Mayor and City Council
February 7, 2024
Page
403 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Bicycle Mobility Plan
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 18
Menifee Mayor and City Council
February 7, 2024
Page
404 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Pedestrian Bridge
The Project proposes to connect the proposed parks and school between the Heritage Lake community to the south and the MVSP area via a pedestrian bridge across the railroad tracks.
The pedestrian bridge is shown in its proposed location to connect the Menifee Valley Sports Park to the existing Heritage Lake Sports Park. It will enhance walking, biking and the overall mobility between the two communities and larger region and will help to overcome the physical barrier imposed by the rail corridor. See images above for the location of the proposed bridge.
Proposed Pedestrian Bridge
Civic Node
A Public Facility – Civic Node is reserved in the southwest corner of the site in Planning Area 9 and would include a fire station, a passenger rail/transit stop, and/or other civic use. The location is positioned next to an inactive RCTC rail corridor that may serve uses in the Specific Plan and nearby areas in the future. Planning Area 9 covers approximately 5.3 acres. It is anticipated that this land will be dedicated to and future development facilitated by the City of Menifee.
Agri-Commercial Area
Agri-Commercial activities are a permitted use in Planning Areas 5, 12, and 13. This use would consist of urban, small-scale agricultural activities focused on crops and animal husbandry. The plant material is expected to be agricultural, although ornamental landscape is expected around the perimeter of the area and in focal point areas such as the entry, and in any on-site parking areas. The Specific Plan contains design guidelines for this particular use. The goal is to ensure the agri-commercial areas are designed to represent and complement past historical barns and support structures of the Menifee Valley community and region while allow for contemporary adaptations.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 19
Menifee Mayor and City Council
February 7, 2024
Page
405 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Example of Agri-Commercial Area
Community Recreation Center
A private community recreation center managed by a Homeowners’ Association (HOA) is expected in Planning Area 2. A design concept is presented in the Specific Plan and is shown below. Features are conceptually designed to include a tot lot, open lawn area, and swimming pool area with shade structures and a restroom building. The location of the community recreation center and final election and design of the amenities will be determined by the Master Developer of Planning Area 2 in consultation with City at the time residential subdivision maps are brought forward. Landscape in the community recreation center area is to be colorful, with blooming trees, shrubs, and vines, and with the primary tree species being different than the tree species used as street trees on adjoining residential streets.
Private Community Recreation Center Concept Design
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 20
Menifee Mayor and City Council
February 7, 2024
Page
406 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Sports Park and Aquatic Facility
One public park is planned in the Specific Plan area, consisting of a public sports park in Planning Area 7A. The proposed public Sports Park would include the following amenities:
•16.9-acre Sports Park
oPlayground
oThree lit ball fields
oTennis/pickleball courts
oConcession/restroom building
oPicnic area
oParking lot
oAquatic Facility
▪Junior Olympic pool
▪Splash pad
▪Concession/restroom building
▪Shade structure
Menifee Valley Sports Park and Aquatic Center
Paseos and Edge Conditions
The Project includes two Planning Areas whose primary use is greenbelt/trails in Planning Areas 8A and 8B. These Planning Areas will serve as a visual buffer between the existing residential uses to the south and the proposed Business Park uses to the north. These two Planning Areas would include the following:
•13.1 acres of greenbelt space and trails
oPaved Class I bicycle trail
oMultipurpose decomposed granite trail
oThe proposed adjacent Business Park uses in Planning Area 10 will either occur at a lower elevation or will be screened via a landscaped earthen berm Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 21
Menifee Mayor and City Council
February 7, 2024
Page
407 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
The Project also includes a planned edge design between the proposed Commercial and Commercial-Business Park uses in Planning Area 13 and 12 and Heritage High School. The edge condition will include the following:
•Separation between the high school buildings and the Project site via the high school’s existing athletic fields and open space
•An 87-foot-wide landscape buffer on the Project’s side adjacent to the high school •Closely spaced, evergreen trees which will create a visual screen •A solid decorative screen wall
•A 100-foot separation between any proposed truck court accommodating diesel-fueled trucks or equipment and the high school property line
•No loading docks will be permitted to face the school
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 22
Menifee Mayor and City Council
February 7, 2024
Page
408 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Granite Hill
The Project proposes to preserve Granite Hill as permanent open space in Planning Area 7B, while allowing trails and other non-invasive activities that will protect the tangible and intangible assets of the landform. Any trail within Granite Hill must meet public safety standards and methods such as signage and physical deterrents would be strategically positioned to keep trail users on the trail and away from environmentally sensitive areas. No development or fuel modification is permitted within Planning Area 7B, except as necessary for construction of Briggs Road.
Elementary School Site
Approximately 12.0 net acres in Planning Area 6 are set aside to develop an elementary school for the Romoland School District. The location of the school site will be determined by the Master Developer of the Specific Plan residential community in consultation with the Romoland School District and City of Menifee. In addition to the school buildings, facilities, and parking, the elementary school site is expected to include outdoor play areas and sports fields.
Entry Monumentation
A primary entry monument for the residential community will be placed at the intersection of Briggs Road and the Primary Residential Entry Street. Smaller-scale and complementary-designed entry monuments may occur at intersections of Briggs Road and Secondary Residential Entry Streets.
However, entry monuments in these secondary locations are not required. All trees planted at project entries will be a minimum 36-inch container box size.
Primary entry monuments for the business park and commercial areas will occur in two locations:
1) at the intersection of SR-74 and Malaga Road that provides access into and through Planning Areas 12 and 13; and 2) at the intersection of Menifee Road and McLaughlin Road that provides access into and through Planning Areas 10 and 11.
Primary Residential Entry Elevation Option 1
Primary Residential Entry Elevation Option 2
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 23
Menifee Mayor and City Council
February 7, 2024
Page
409 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Primary Residential Entry Elevation Option 3
Primary Commercial/Industrial Entry Elevation
Architecture
The architectural design guidelines presented in the Specific Plan provide a general framework for the quality and character of the built environment expected for the MVSP. The guidelines are intended to ensure a consistent level of quality design that accommodates emerging architectural trends and supports green building practices.
The desired quality and character of the housing mix according to the Specific Plan is presented below.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 24
Menifee Mayor and City Council
February 7, 2024
Page
410 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
The desired quality and character of Business Park buildings according to the Specific Plan is shown below.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 25
Menifee Mayor and City Council
February 7, 2024
Page
411 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
The desired quality and character of Commercial-Business Park and Commercial buildings according to the Specific Plan is shown below.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 26
Menifee Mayor and City Council
February 7, 2024
Page
412 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Phasing
The Project area is expected to be mass graded in one phase, with fine grading and implementing development to follow in three phases. Implementing Residential developments are expected to commence in the southern portion of the Specific Plan area and move northerly in sequence.
Implementing Business Park and Commercial-Business Park development is expected to commence in the northern portion of the MVSP area and move southerly in sequence.
Commercial development along SR-74 is anticipated as the third and final phase of development.
Given the size of the property, grading and implementing development activities in the Specific Plan area may occur concurrently. Various land uses may be under development at the same time and built in response to market demands and according to a logical and orderly extension of roadways, public utilities, and infrastructure. Planning Areas may be developed out of the expected sequence, or in smaller increments, provided the required infrastructure and services are available at the time of development to provide adequate access to and from the Project site and ensure public health and safety.
The exhibit below provides a conceptual phasing plan. Table 7A, Open Space Phasing Thresholds, of the Specific Plan provides conceptual timing thresholds for the open space planning areas. The exact timing of implementation and phasing for any Planning Area may vary based on a number of factors, including market and economic demands, as well as physical constraints or timing of infrastructure improvements. The final phasing for the development will be determined through future implementing projects and any phasing requirements specified in the Development Agreement that accompanies this Specific Plan.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 27
Menifee Mayor and City Council
February 7, 2024
Page
413 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
The expected development sequence is as follows:
I. Phase 1:
a. Planning Areas 1 and 2 (Residential)
b. Planning Areas 7A, 7B, and 8A (Open Space- Recreation, Open Space- Conservation, and Greenbelts)
c. Planning Area 11 (Business Park)
d. Planning Area 12 (Commercial Business Park)
e. Residential Spine Street; Briggs Road (along Planning Areas 1, 7A, and 7B); Menifee Road (along Planning Area 11); McLaughlin Road; and Malaga Road (from SR-74)
II. Phase 2:
a. Planning Area 9 (Public Facility)
b. Planning Areas 3, 4, 5 (Residential)
c. Planning Area 6 (School)
d. Planning Area 8B (Open Space-Greenbelt)
e. Planning Area 10 (Business Park)
f. Briggs Road (along Planning Areas 3 and 5) and Menifee Road (along Planning Area 10)
III. Phase 3:
a. Planning Area 13 (Commercial Retail)
b. SR-74 and Menifee Road (Along Planning Area 9)
c. Pedestrian and Bike-Only Bridge
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 28
Menifee Mayor and City Council
February 7, 2024
Page
414 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Conceptual Phasing Plan
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 29
Menifee Mayor and City Council
February 7, 2024
Page
415 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Tentative Tract Map
As stated above, the Project includes a subdivision to establish 11 lots with the boundaries and dimensions of streets and the proposed mass grading for the MVSP.
TTM Exhibit
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 30
Menifee Mayor and City Council
February 7, 2024
Page
416 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Development Agreement
The applicant has proposed a DA with a public benefit of excess improvements that otherwise could not be required, of $37 million (described in Exhibit F of the attached DA). In addition, Developer will be paying fair share contributions for off-site improvements of over $4.7 million (described in Exhibit E of the attached DA). The following is a summary of provisions that are included within the DA:
a) Term: 15 years with option for an additional 5 years subject to completion of a minimum of 75,000 square feet of commercial retail constructed along SR-74. (Note this is approximately 65% of 115,000 square feet anticipated in Lot 2 of the proposed TTM [in PA 13 east of Malaga Road]).
b) Development Impact Fee (DIF) credits for constructing public infrastructure. No freeze. c) Public Facility Site dedication of lot within 10 days following recordation of Map 38303.
Graded pad with utilities complete no later than April 1, 2025. Frontage improvements completed by developer.
d) Fire Station $10M cash contribution for City construction (paid in 2 increments for design $2.5m/construction $7.5 with goal to have construction completed close to 1 st building occupancies).
e) Sports Park/Aquatics Center/Pedestrian Bridge Timing:
•Plot Plan to be approved within 6 months of Tract Map recordation creating the park lot.
•Construction drawings to be approved prior to 1 st production certificate of occupancy for residential.
•Complete construction and open to public prior to 250 th residential occupancy. •Park DIF credits, but no reimbursement available for above-beyond facilities. •Pedestrian Bridge construction drawing approved prior to 1 st residential certificate of occupancy and construction complete prior to permit issuance of 250 th residence. Exception for outside agency approvals with $3.9 million public benefit to go toward McCall Blvd improvement reimbursements if necessary. f) Paseo Timing: Class 1 bike trail and pedestrian trail completed prior to 1 st occupancies within any of PA’s 1, 2, 9, and 10. Balance of paseo PA 8A completed prior 1st residential occupancy. Balance of paseo PA8B completed prior to earlier of issuance of 1st permit for any non-residential building within 600 feet of nearest residential unit to the south, and 1st certificate of occupancy in PA 10.
g) Private Rec Center/Clubhouse timing: Complete prior to 1 st production certificate of occupancy for the residential.
h) Retail Commercial timing:
•Advanced completion of a minimum of 34,500 square feet (or approximately 30% of the anticipated retail commercial anticipated as Food Hall concept) based on forecasted daily trips for either residential or commercial business park. •Allowance for further market conditions analysis should the developer/assignee not be able to perform.
i) Subsequent Approvals:
•Administrative approvals by City Manager/Designee if proposals are consistent with Specific Plan and all development/design standards. No administrative approvals of Variances/Conditional Use Permits/additional CEQA documentation.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 31
Menifee Mayor and City Council
February 7, 2024
Page
417 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Authority to take to Planning Commission/City Council at City Manager/Community Development Director discretion. Appeal rights would still exist. •Allowances as follows consistent with Specific Plan Figure 2.1:
-Residential Tract Maps
-Commercial Plot Plans
-Industrial Plot Plans as long as buildings do not exceed:
-1,450,000 square feet in PA 10
-1,400,000 square feet in PA 11
-570,000 square feet in PA 12
j) Plan Check/Inspection:
•City to process all plan checks with 3-week review for 1 st submittal/2 week review for all subsequent submittals subject to:
oAvailable staffing; and
oBrookfield to submit plans for a phased project and all submittals to include detailed memo identifying all design exceptions, responses to all comments, and pre-submittal meetings with all relevant experts in attendance.
k) Transportation Improvements:
•McCall Blvd. Offsite Improvements: Construct with subsequent development approvals that result in specified threshold of forecasted daily trips.
Reimbursement for 63 percent of Brookfield’s actual costs of construction to be paid back through Transportation Uniform Mitigation Fees (TUMF), Community Facilities District (CFD) premiums, funds collected from Battery Storage Community Benefit Agreements, or general fund within 3 years of completion. The remaining 37% of the costs of the McCall Boulevard offsite improvements are designated as Brookfield’s fair share and are not eligible for reimbursement. •Prior to 1 st Industrial Occupancy:
oMenifee Road improvements along project frontage
oMenifee Road/McLaughlin Road intersection improvements oMalaga Road to McLaughlin Road (in project)
oMcLaughlin Road in project (up to and including roundabout) oMcLaughlin Road from Menifee Road to Case Road
oMatthew Road/Case Road to within 250’ of Ethanac Road
•Prior to 1 st Certificate of Occupancy beyond Buildings 1, 3 and 4:
oSR-74 along project frontage west of Malaga Road
oSR-74/Malaga Road intersection/traffic signal
oSR-74/Menifee Road intersection
•Prior to 1 st Residential Occupancy
oBriggs Road along project frontage
oMenifee Valley Road (spine road)
oMcLaughlin Road east of roundabout to Briggs Road
•Prior to 200 th Residential Certificate of Occupancy
oSR-74 and Briggs Road intersection
•Prior to 1 st Commercial Certificate of Occupancy
oSR-74 improvements along project frontage
•Transportation DIF credits/reimbursement allowable up to maximum paid for the development.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 32
Menifee Mayor and City Council
February 7, 2024
Page
418 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
•Project will be required to participate in one or more future Road and Bridge Benefit Districts (RBBD) with credits provided to the Developer for improvements constructed through those districts.
•Off-site fair share contributions of more than $4.7M per the Project Traffic Impact Analysis (TIA).
•Off-site construction improvement timing per TIA. City to assist with eminent domain when necessary for General Plan-designated roadways.
ENVIRONMENTAL DETERMINATION
Notice of Preparation (NOP)
On March 10, 2022, the City of Menifee publicly noticed its decision to prepare an EIR and hold a public scoping meeting for the Project by noticing the California Governor’s Office of Planning and Research (State Clearinghouse [SCH]) and distributed the NOP to various agencies and surrounding property owners and residents in accordance with CEQA requirements. The NOP review period was from March 10, 2022 to April 8, 2022. On March 29, 2022, the City of Menifee held a duly noticed public scoping meeting at City Hall regarding the preparation of the Draft EIR and provided an opportunity for members of the public to comment on the scope of environmental issues to be addressed in the EIR. No residents were in attendance. However, one representative for the Southwest Regional Council of Carpenters, David Cordero, was present and spoke at the scoping meeting.
EIR Impacts
Within the EIR that has been prepared for the Project (SCH No. 2022030233), mitigation measures are provided under the categories of air quality, biological resources, cultural resources, greenhouse gas (GHG) emissions, hazards and hazardous materials, land use and planning, noise and vibrations, tribal cultural resources, and transportation. The EIR determined that the Project could result in significant and unavoidable impacts under the category of air quality, greenhouse gas emissions, land use and planning, and transportation based on the analysis and findings in the Draft EIR and requires adoption of a SOOC. A brief description of these significant and unavoidable impacts is provided below:
•Air Quality
oConflict with or obstruct implementation of an applicable air quality plan. The proposed Project would have the potential to conflict or obstruct implementation of applicable air quality plans, because the proposed Project would result in significant and unavoidable long-term operational pollutant emissions. Although there is no feasible mitigation to reduce operational pollutant emissions to a less than significant level, the mitigation measures proposed in the EIR would require the implementation of all feasible measures to reduce operational impacts associated with the proposed Project.
oResult in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or State ambient air quality standard. There is currently not enough information to quantify emissions of specific project development that may occur under the proposed Project. Without quantification to guarantee a less than significant finding, similar to the finding for the on-site project operations, future development may still Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 33
Menifee Mayor and City Council
February 7, 2024
Page
419 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
exceed the South Coast Air Quality Management District (SCAQMD) regional significance thresholds.
oExpose sensitive receptors to substantial pollutant concentrations. With implementation of the proposed mitigation measures, the potential health impacts associated with construction of the proposed Project would be less than significant. However, similar to the above, operational emissions would be significant and unavoidable.
•GHG Emissions
oGenerate GHG emissions, either directly or indirectly, that may have a significant impact on the environment. While the proposed mitigation would serve to reduce GHG emissions associated with build-out of the proposed Project, GHG emission impacts would remain significant and unavoidable because compliance with future efficiency targets cannot be ensured.
•Land Use and Planning
oConflict with Applicable Land Use Plans, Policies, or Regulations in the General Plan Circulation Element. Even with payment of the Project’s fair share for recommended intersection improvements, or implementation of improvements, as required in the proposed mitigation, existing or forecasted operational deficiencies cannot be fully improved to the desired LOS at several intersections because of right-of-way constraints. As such, the proposed Project would not be able to improve the LOS at some intersections to meet the City’s General Plan levels the City strives to maintain (Policy C 1.2). Because this would cause a conflict with General Plan Policy C.1.2, this is considered a significant and unavoidable impact.
•Transportation and Traffic
oConflict with a program, plan, ordinance, or policy addressing the circulation system in the General Plan Circulation Element. As previously stated, the proposed Project would not be able to improve the LOS at several intersections as discussed above to meet the LOS the City’s General Plan strives to achieve.
Therefore, the proposed Project would conflict with a program, plan, ordinance, or policy addressing the roadway facilities (Circulation Element C 1.2). oConflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b). Despite the requirement for the preparation of a Transportation Demand Management (TDM) strategy report to reduce employee Vehicle Miles Traveled (VMT), VMT impacts cannot be guaranteed to reduce the industrial and service component’s VMT per employee and retail component’s total VMT to a less than significant level.
Draft EIR Public Review
The City distributed the Draft EIR for public review beginning October 19, 2023 and ending December 4, 2023. During the public review period, comments on the Draft EIR were received from the following agencies, groups, or individuals:
1. Adams Broadwell Joseph and Cardozo, Attorneys at Law Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 34
Menifee Mayor and City Council
February 7, 2024
Page
420 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
2. Agua Caliente
3. South Coast Air Quality Management District
4. Eastern Municipal Water District
5. Riverside County Flood Control and Water Conservation District
6. Riverside Transit Agency
7. City of Perris
The City prepared a FEIR, consisting of all of the comment letters received during the 45-day public review and comment period on the Draft EIR, written responses to those comments, and revisions and errata to the Draft EIR. The FEIR was distributed to the Draft EIR commenters ten days prior to the Planning Commission hearing. The FEIR, and Draft EIR, including technical appendices can be accessed for review on the City website at https://www.cityofmenifee.us/325/Environmental-Notices-Documents.
Findings of Fact and SOOC
Because the Draft EIR identified unavoidable significant adverse impacts that could not be mitigated below the level of significance, Findings and a SOOC are required to approve the Project. The Findings and SOOC are included within the Resolution for the EIR for consideration by the City Council.
According to the SOOC the economic, legal, social, or technological benefits, independent of the other benefits, override the potential significant unavoidable adverse impacts and render acceptable each of these unavoidable adverse environmental impacts.
Although significant impacts will remain, the City will mitigate any significant adverse impacts to air quality, GHG emissions, land use and planning, and transportation to the maximum extent practicable. In its decision to approve the Project, the City Council will consider the Project benefits to override the environmental impacts.
PREVIOUS MEETINGS
Economic Development Subcommittee – November 8, 2023
On November 8, 2023, staff presented to the Economic Development Subcommittee the proposed DA and received feedback. Modifications to the DA have been made to incorporate input from the Economic Development Subcommittee.
Parks, Recreation and Trails Commission – December 7, 2023 On December 7, 2023, staff presented to the City of Menifee Parks, Recreation and Trails Commission (PRTC) the Menifee Valley Sports Park and Aquatic Facility conceptual plans and Quimby analysis presented for incorporation in the Specific Plan. The proposed Project includes the construction and operation of a 29.8-acre Sports Park and Aquatic Center to fully meet the Quimby Act requirements for parkland dedication. At this meeting, the Commission recommended approval of the conceptual plans for the Menifee Valley Sports Park and Aquatic Facility and determined the Project meets its Quimby Act requirements for parkland dedication.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 35
Menifee Mayor and City Council
February 7, 2024
Page
421 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
Finance Committee – December 12, 2023
Staff presented to the City of Menifee Finance Committee the MVSP DA. At this meeting, the Finance Committee recommended submittal of the DA to the Planning Commission and City Council for approval.
Community Meeting, Heritage Lake HOA – December 13, 2023 The Project applicant conducted community outreach efforts by holding an information session/town hall meeting with the Heritage Lake community. The Project applicant also presented the proposed project to the EDC Board, the Menifee Valley Chamber of Commerce Board and the Perris Union High School District and Romoland Elementary School District.
FINDINGS
Findings for the EIR, GPA, CZ, SPA, SP, TTM, and DA are included in the attached Resolutions and Ordinances.
PUBLIC NOTICE
The proposed Project was noticed on January 28, 2024 for the February 7, 2024 City Council public hearing. A public notice was published in The Press Enterprise and notices were mailed to property owners and non-owner residents within a 300-foot radius of the Project site. The proper public notice was posted on-site, and in addition, all relevant public agencies and those requesting notification were notified of the public hearing.
STRATEGIC PLAN OBJECTIVE
Thriving Economy
FISCAL IMPACT
The positive fiscal impacts to the City associated with the recommended action are discussed in the attached Findings and SOOC. However, to highlight the major fiscal impacts, the Developer would provide public benefits valued at more than $37M established through the DA between the Project Applicant and the City that would establish early and additional transportation improvements (above what would otherwise be required). The Developer would also remit a $10M cash contribution/land dedication for a City fire station, park, and pedestrian bridge. The Developer is also responsible for payment of fair share fees in the amount of more than $4.7M for offsite improvements. Lastly, the Project would have a net fiscal benefit estimated at more than $1M per year to the City of Menifee General Fund.
Revenues received as part of the Project shall be budgeted in future fiscal years where appropriate. No additional budget appropriation action(s) is required.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 36
Menifee Mayor and City Council
February 7, 2024
Page
422 of 1677
City of Menifee City Council
Menifee Valley SP
February 7, 2024
1 9
6 3
ATTACHMENTS
1. Resolution – EIR
2. Exhibit A – FEIR
3. Exhibit B – Findings and SOOC
4. Exhibit C – MMRP
5. Ordinance – CZ/SPA/SP
6. Exhibit A – CZ Exhibit
7. Exhibit B – SP 301 Amendment No. 3
8. Exhibit C – MVSP
9. Resolution – GPA
10. Exhibit A – GPA Exhibit
11. Resolution – TTM
12. Exhibit A – Conditions of Approval
13. Exhibit B – Tentative Tract Map Exhibits
14. Ordinance – DA
15. Exhibit A – DA
16. Public Hearing Notice
17. Public Comments
18. City Responses to WSRCC Letter
19. City Responses to City of Perris
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 37
Menifee Mayor and City Council
February 7, 2024
Page
423 of 1677
RESOLUTION NO. 24-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENIFEE,
CALIFORNIA CERTIFYING AN ENVIRONMENTAL IMPACT REPORT
(SCH# 2022030233) FOR THE MENIFEE VALLEY SPECIFIC PLAN
PROJECT, MAKING CERTAIN FINDINGS PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT, ADOPTING A
STATEMENT OF OVERRIDING CONSIDERATIONS, AND ADOPTING
A MITIGATION MONITORING AND REPORTING PROGRAM
WHEREAS, on June 8, 2021, the applicant, Minor Ranch, LLC (“Applicant”) filed a formal application with the City of Menifee for the approval of the application for General Plan Amendment (GPA) No. PLN 21-0336 which proposes to change the General Plan land use map to include the Menifee Valley Specific Plan (MVSP) land use designation and remove the Project site from the Menifee Valley Ranch Specific Plan No. 301 (SP 301), Change of Zone (CZ) No. PLN 21-0335 which proposes to revise the City Zoning Map to include the MVSP zone, Specific Plan Amendment (SPA) No. PLN 21-0221 which proposes to remove a 590.3-acre portion of SP 301, Specific Plan No.
PLN 21-0217 which proposes to establish land uses and development standards for the same 590.3-acre site, a Tentative Tract Map (TTM) No. PLN 22-0033 for a subdivision for conveyance purposes and mass grading, and a Development Agreement (DA) No.
PLN 21-0338 for the establishment of provision for development of the Project such as, but not limited to infrastructure improvement, park benefits, vesting of development rights and timing of public improvements (collectively, the applications are referred to as the “Project,” “Menifee Valley Specific Plan,” or “MVSP”); and WHEREAS, on March 10, 2022, the City of Menifee publicly noticed its decision to prepare an Environmental Impact Report (EIR) for the Project by noticing the State Clearinghouse, and other agencies in compliance with Section 15082 of the California Environmental Quality Act (CEQA) guidelines, and surrounding property owners within a 300-foot radius from the Project site boundaries; and
WHEREAS, on March 29, 2022, the City of Menifee held a duly noticed public scoping meeting regarding the preparation of the EIR to discuss and hear from the public on the potential environmental impacts, which meeting was publicly noticed in compliance with Section 15082 of the CEQA guidelines, and surrounding property owners within a 300-foot radius from the Project site boundaries; and WHEREAS, between October 19, 2023, and December 4, 2023, the City complied with the State-mandated forty-five day public review period for the Menifee Valley Specific Plan Draft EIR (Draft EIR), which was publicly noticed in accordance with Section 15087 of the CEQA guidelines and mailed to surrounding property owners and non-owner residents within 300 feet of the Project site. A copy of the Draft EIR was sent to the State Clearinghouse (SCH# 2022030233), and a copy of the Draft EIR was placed at the City Hall public counter, Menifee Library and Sun City Library; and WHEREAS, during the public review period, comments on the Draft EIR were received from the Riverside Transit Agency, Adams Broadwell Joseph & Cardozo, Advocates for the Environment, City of Perris, Agua Caliente Band of Cahuilla Indians, South Coast Air Quality Management District, Riverside County Flood Control and Water Conservation District, and Eastern Municipal Water District; and Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 38
Menifee Mayor and City Council
February 7, 2024
Page
424 of 1677
Menifee Valley Specific Plan – EIR
February 7, 2024
WHEREAS, the Final EIR (FEIR) consisting of comments received during the forth-five day public review and comment period on the Draft EIR, written responses to those comments, and revisions and errata to the Draft EIR, was submitted with the inclusion of a Statement of Overriding Consideration (SOOC) and a Mitigation Monitoring and Reporting Program (MMRP) for the City Council’s consideration. For the purposes of this Resolution, the FEIR shall refer to the Draft EIR, as revised by the FEIR’s errata section together with the other sections of the FEIR; and WHEREAS, no evidence of new significant impacts, as defined by CEQA Guidelines Section 15088.5, have been received by the City after circulation of the Draft EIR which would require re-circulation; and
WHEREAS, the Draft EIR for the Project, dated October 2023, and FEIR for the Project, dated December 2023 provides an assessment of the environmental impacts associated with the Project and has been prepared in accordance with CEQA, Public Resources Code Section 21000 et seq, and State regulations in Title 14 of the California Code of Regulations, Section 15000 et seq. (“CEQA Guidelines”); and WHEREAS, on January 10, 2024, the Planning Commission of the City of Menifee held a public hearing on the Project, considered all public testimony as well as all materials in the staff report and accompanying documents for the Project including the consideration of the FEIR, which hearing was publicly noticed by a publication in The Press Enterprise, a newspaper of general circulation, an agenda posting, notices placed on the project site, and notice to property owners within 300 feet of the Project boundaries, and to persons requesting public notice; and WHEREAS, at the January 10, 2024 Planning Commission public hearing, based upon the materials in the staff report and accompanying documents, public comments, and Planning Commission discussion, the City of Menifee Planning Commission recommended the City Council certify an EIR for the Project, adopt the SOOC and adopt a MMRP; and
WHEREAS, on February 7, 2024, the City Council held a duly noticed public hearing on the Project, considered all public testimony as well as all materials in the staff report and accompanying documents for the Project, which hearing was publicly noticed in The Press Enterprise, a newspaper of general circulation, an agenda posting, on-site posting, notice to property owners within 300 feet of the Project boundaries, and to persons requesting public notice; and
WHEREAS, the City Council of the City of Menifee has read and considered all environmental documentation comprising the FEIR, has found that the FEIR considers all potentially significant environmental impacts of the proposed project and is complete and adequate, and fully complies with all requirements of CEQA; and WHEREAS, it is the policy of the State of California and the City of Menifee, in accordance with CEQA and the CEQA Guidelines, that the City shall not approve a project that has significant effects on the environment unless there is no feasible way to lessen or avoid the significant effects and that the benefits of approving the project outweigh the unavoidable significant impacts, such that the impacts are acceptable based on CEQA Guideline Section 15093; and
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 39
Menifee Mayor and City Council
February 7, 2024
Page
425 of 1677
Menifee Valley Specific Plan – EIR
February 7, 2024
WHEREAS, the CEQA Guidelines provide that no public agency shall approve or carry out a project for which an EIR has been completed and which identifies one or more significant effects of the project unless the public agency makes written findings for each of the significant effects, accompanied by a statement of facts supporting each finding; and
WHEREAS, the City Council has reviewed the attached CEQA Findings and of Fact and SOOC; and
WHEREAS, prior to recommending action on the Project, the City Council has considered all significant impacts, mitigation measures, and project alternatives identified in the EIR, and has found that all potentially significant impacts on the Project have been lessened or avoided to the extent feasible; and WHEREAS, pursuant to CEQA Guideline Section 15093(b), the City must state in writing the reasons to support its action based on the FEIR and/or other information in the record.
NOW, THEREFORE, the City Council of the City of Menifee resolves as follows:
Section 1: Recitals. The Recitals above are true and correct, based on substantial evidence in the record, including the FEIR, attached as “Exhibit A,” and incorporated herein by this reference.
Section 2: Certification of EIR. Based on its review and consideration of the FEIR and all written communications and oral testimony regarding the proposed project which have been submitted to, and received by, the City, the City Council certifies that the FEIR has been completed in compliance with CEQA and the State and local CEQA Guidelines. The City Council finds that the FEIR reflects the City Council’s independent judgment and analysis as lead agency under CEQA, and adopt and certify the FEIR as complete and adequate. The City Council further certifies that the FEIR was presented to the City Council and that the City Council reviewed and considered the information contained in it prior to approving the Project.
Section 3: CEQA Findings of Fact and Statement of Overriding Considerations. The City Council adopts the CEQA Findings of Fact and the SOOC attached as “Exhibit B,” which exhibit is incorporated herein as though set forth in full.
Section 4: Significant Impacts. The significant impacts of the Project under the categories of air quality, greenhouse gas emissions, land use and planning, and transportation have not been reduced to a level of insignificance. The City Council finds that the significant unavoidable adverse impacts of the Project are clearly outweighed by the economic, social and other benefits of the Project, as set forth in the Findings of Fact and SOOC.
Section 5: Alternatives. The FEIR has described all reasonable alternatives to the Project that could feasibly obtain the basic objectives of the Project, even when those alternatives might impede the attainment of Project objectives and might be more costly.
Section 6: Good Faith. A good faith effort has been made to seek out and incorporate all points of view in the preparation of the FEIR as indicated by the public record for the Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 40
Menifee Mayor and City Council
February 7, 2024
Page
426 of 1677
Menifee Valley Specific Plan – EIR
February 7, 2024
Project and the FEIR.
Section 7: Mitigation Plan Approval. Although the FEIR identifies certain significant environmental effects that would result from approval of the Project, certain environmental effects can feasibly be avoided or mitigated and will be avoided or mitigated by imposition of mitigation measures included in the FEIR and the MMRP.
Pursuant to Public Resources Code section 21081 and CEQA Guidelines section 15097, the City Council adopts and approves the MMRP attached hereto as “Exhibit C,” which is incorporated herein by reference as though set forth in full. The City Council further finds that the mitigation measures identified in the FEIR are feasible.
Section 8: No Significant New Information Added to Draft EIR. The information provided in the various reports submitted in connection with the proposed Project and in the responses to comments on the Draft EIR, the information added to the FEIR, and the evidence presented in written and oral testimony at public hearings on the Project and the Draft EIR, do not constitute significant new information that would require recirculation of the Draft EIR pursuant to Public Resources Code section 21092.1 and CEQA Guidelines section 15088.5.
Section 9: Location and Custodian of Record of Proceedings. The Community Development Department of the City of Menifee, located at 29844 Haun Road, Menifee, CA 92586, is hereby designated as the custodian of the documents and other materials which constitute the record of proceedings upon which the City Council's resolution is based, which documents and materials shall be available for public inspection and copying in accordance with the provisions of the California Public Records Act (Government Code § 6250 et seq.) during normal business hours.
PASSED, APPROVED AND ADOPTED this 7th day of February 2024. _________________________
Bill Zimmerman Mayor
Attest:
_________________________________
Sarah Manwaring, City Clerk
Approved as to form:
_________________________________
Jeffrey T. Melching, City Attorney
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 41
Menifee Mayor and City Council
February 7, 2024
Page
427 of 1677
December 2023
FINAL
E N V I R O N M E N T A L I M P A C T R E P O R T –
R E S P O N S E T O C O M M E N T S A N D E R R A T A
MENIFEE V ALL EY SPEC IFIC PLAN
MENIFEE, C ALIFORN IA
SC H #2022030 233
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 42
Menifee Mayor and City Council
February 7, 2024
Page
428 of 1677
This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 43
Menifee Mayor and City Council
February 7, 2024
Page
429 of 1677
i
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
TABLE OF CONTENTS
TABLE OF CONTENTS ................................ ................................ ................................ .......................... i LIST OF ABBREVIATIONS AND ACRONYMS ................................ ................................ ......................... ii
1.0 INTRODUCTION ................................................................................................ 1-1
1.1 Index of Comments Received ................................ ................................ ........................ 1-3
1.2 Format of Responses to Comments ................................ ................................ .............. 1-3
2.0 RESPONSES TO COMMENTS ............................................................................. 2-1
2.1 Regional Agencies ................................ ................................ ................................ ......... 2-1
2.1.1 Riverside Transit Agency (RTA) ................................ ................................ ....................... 2-3
2.1.2 South Coast Air Quality Management District (SCAQMD)................................ ................ 2-5
2.1.3 Eastern Municipal Water District (EMWD) ................................ ................................ ...... 2-9
2.1.4 Riverside County Flood Control and Water Conservation District (District) .................... 2-13
2.1.5 South Coast Air Quality Management District (SCAQMD)................................ .............. 2-19
2.2 Local Agencies ................................ ................................ ................................ ............ 2-33
2.2.1 City of Perris ................................ ................................ ................................ ................ 2-35
2.3 Organizations ................................ ................................ ................................ ............. 2-47
2.3.1 Adams Broadwell Joseph & Cardozo................................ ................................ ............. 2-49
2.3.2 Agua Caliente Band of Cahuilla Indians (Agua Caliente Band) ................................ ........ 2-55
3.0 ERRATA ............................................................................................................ 3-1
3.1 Draft EIR - Global Revision ................................ ................................ ............................ 3-1
3.2 Chapter 3.0, Project Description ................................ ................................ ................... 3-1
4.0 MITIGATION MONITORING AND REPORTING PROGRAM .................................. 4-1
4.1 Mitigation Monitoring Requirements ................................ ................................ ............ 4-1
4.2 Mitigation Monitoring Procedures ................................ ................................ ................ 4-2
TABLE
Table 1.A: Comments Received During the Public Comment Period ................................ ................ 1-3 Table 7.A: Mitigation and Monitoring Reporting Program ................................ .............................. 4-3
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 44
Menifee Mayor and City Council
February 7, 2024
Page
430 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) ii
LIST OF ABBREVIATIONS AND ACRONYMS
Agua Caliente Band Agua Caliente Band of Cahuilla Indians CalEEMod California Emissions Estimator Model
CARB California Air Resources Board
CARE CA Californians Allied for a Responsible Economy
CCR California Code of Regulations
CEQA California Environmental Quality Act
City City of Menifee
District Riverside County Flood Control and Water Conservation District DPM diesel particulate matter
EIR Environmental Impact Report
EMWD Eastern Municipal Water District
EV electric vehicle
FEMA Federal Emergency Management Agency
HRA health risk assessment
HVAC heating, ventilation, and air conditioning
MERV Minimum Efficiency Reporting Value
NCHRP National Cooperative Highway Research Program
NEV neighborhood electric vehicle
NOA Notice of Availability
NOC Notice of Completion
NOP Notice of Preparation
NPDES National Pollutant Discharge Elimination System
NZE near-zero emission
OEHHA Office of Environmental Health Hazard Assessment
RIVCOM Riverside County Transportation Model
RTA Riverside Transit Agency
SCAQMD South Coast Air Quality Management District
TIA Traffic Impact Analysis
VMT vehicle miles traveled
ZE Zero Emissions
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 45
Menifee Mayor and City Council
February 7, 2024
Page
431 of 1677
1-1
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
1.0 INTRODUCTION
This document comprises the Final Environmental Impact Report (EIR) for the proposed Menifee Valley Specific Plan (proposed Project). It is composed of comments received during the public review period, responses to those comments , and an Errata section that clarifies, amplifies, or makes minor modifications to the Draft EIR text . The Draft EIR and technical appendices are provided separately in Volume II.
In accordance with State CEQA Guidelines Section 15060, the City of Menifee (City) has determined that the Project would have a potentially significant effect on the environment and an EIR was required to assess Project-related impacts. As permitted under the California Environmental Quality Act (CEQA) (State CEQA Guidelines §15060[d]), the City elected to begin work directly on the EIR in lieu of further initial review. Because an Initial Study was not prepared for the Project, the EIR addressed each of the environmental issues identified in Appendix G of the State CEQA Guidelines:
• Aesthetics • Land Use and Planning
• Agriculture and Forestry Resources • Mineral Resources • Air Quality • Noise
• Biological Resources • Population and Housing
• Cultural Resources • Public Services
• Energy • Recreation
• Geology and Soils • Transportation
• Greenhouse Gas Emissions • Tribal Cultural Resources
• Hazards and Hazardous Materials • Utility and Service Systems • Hydrology and Water Quality • Wildfire
In compliance with Section 15201 of the State CEQA Guidelines, the City has provided opportunities for public participation in the environmental process. The City distributed a Notice of Preparation (NOP) on March 10, 2022 to the California State Clearinghouse, responsible agencies, and interested parties for a 30-day public review period (from March 10 to April 8, 2022 ). The Cit y also made the NOP available on the City’s website to inform agencies and the public about the proposed Project and to solicit input on the scope of the Draft EIR. The NOP described the Project and identified potential environmental impacts associated with Project development and operation. Further, a public scoping meeting was held on March 29, 2022, at 5:30 p .m., in the City of Menifee City Hall.
Comments received during the public review of the NOP have been previously identified and summarized in Table 1.A located in Chapter 1.0 of the Draft EIR. The NOP and all comments received are provided in Appendix A -1 of the Draft EIR. Table 1.B in Chapter 1.0 of the Draft EIR provides a general summary of public scoping comments received on the Project. The public scoping meeting materials are provided in Appendix A-2.
CEQA requires a Draft EIR to have a review period lasting at least 45 days for projects that have been submitted to the California State Clearinghouse for review ( State CEQA Guidelines Section 150105(a)). As required by State CEQA Guidelines Section 15087, the City provided a public Notice of Availability (NOA) of the Draft EIR for the proposed Project at the same time it filed a Notice of Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 46
Menifee Mayor and City Council
February 7, 2024
Page
432 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 1-2 Completion (NOC) with the State Clearinghouse. The Draft EIR was circulated for public review for a period of 45 days, from October 19, 2023, through December 4, 2023.
The City used several public approaches to solicit comments on the Draft EIR. The City published the NOA with the Press Enterprise on October 19, 2023. The NOA was mailed to the last known name and address of agencies, organizations, and individuals who previously requested such notice in writing as well as all property owners within a 300-foot radius of the Project site. The City submitted the Draft EIR to the State Clearinghouse for distribution to, and review by, State agencies. The City made copies of the Draft EIR available at three locations: the City of Menifee City Hall, the Sun City Library, and the Menifee Library. The City also posted the NOA at the Marion V. Ashley Community Center. In addition, the City posted the Draft EIR and all technical appendices on the City website.
The City received eight comment letters on the Draft EIR . Comments were received from regional agencies, local agencies, and organizations. The comments are included in and responded to in this Final EIR. Comments that address environmental issues are responded to thoroughly. Comments that (1) do not address the adequacy or completeness of the Draft EIR; (2) do not raise environmental issues; or (3) do request the incorporation of additional information not relevant to environmental issues do not require a response, pursuant to Section 15088(a) of the State CEQA Guidelines.
Section 15088 of the State CEQA Guidelines, Evaluation of and Response to Comments, states:
a) The lead agency shall evaluate comments on environmental issues received from persons who reviewed the draft EIR and shall prepare a written response.
The lead agency shall respond to comments received during the noticed comment period and any extensions and may respond to late comments. b) The written response shall describe the disposition of significant environmental issues raised (e.g., revisions to the proposed project to mitigate anticipated impacts or objections). In particular, major environmental issues raised when the lead agency’s position is at variance with recommendations and objections raised in the comments must be addressed in detail, giving the reasons that specific comments and suggestions were not accepted. There must be good faith, reasoned analysis in response. Conclusory statements unsupported by factual information will not suffice.
c) The response to comments may take the form of a revision to the draft EIR or may be a separate section in the final EIR. Where the response to comments makes important changes in the information contained in the text of the draft EIR, the lead agency should either:
1. Revise the text in the body of the EIR; or
2. Include marginal notes showing that the information is revised in the responses to comments.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 47
Menifee Mayor and City Council
February 7, 2024
Page
433 of 1677
1-3
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Information provided in this Final EIR clarifies, amplifies, or makes minor modifications to the Draft EIR. No significant changes have been made to the information contained in the Draft EIR as a result of the comments received on the Draft EIR, and no significant new information has been added that would require recirculation of the document pursuant to State CEQA Guidelines Section 15088.5.
This Final EIR also includes an Errata section that clarifies and makes minor modifications to the Draft EIR as a result of comments received during the public review period.
1.1 INDEX OF COMMENTS RECEIVED
The following is an indexed list of the agencies and individuals that commented on the Draft EIR. The comments received have been organized in a manner that facilitates finding a particular comment or set of comments. Each comment letter received is indexed or coded with a number as shown in Table 1.A below.
Table 1.A: Comments Received During the Public Comment Period Comment Code Signatory Date
Regional
R-1 Riverside Transit Authority (RTA) 10/24/2023
R-2 South Coast Air Quality Management District (SCAQMD) 11/14/2023 R-3 Eastern Municipal Water District (EMWD) 11/20/2023
R-4 Riverside County Flood Control and Water Conservation District (District) 11/27/2023 R-5 South Coast Air Quality Management District (SCAQMD) 12/12/2023 Local
L-1 City of Perris 12/4/2023
Organizations (not affiliated with government agencies) O-1 Adams Broadwell Joseph & Cardozo 10/20/2023
O-2 Agua Caliente Band of Cahuilla Indians (Agua Caliente Band) 11/07/2023
1.2 FORMAT OF RESPONSES TO COMMENTS
Responses to each of the indexed/coded comment letters are provided on the following pages. The comment code is provided in the upper right corner of each comment letter, and individual comments within each letter are numbered along the right -hand margin of each letter. The City’s responses to each comment letter immediately follow each letter and are referenced by the index numbers in the margins. As noted in some of the responses, the City has made some text revisions to the Draft EIR in response to certain comments. Proposed revisions to the Draft EIR are included in Chapter 3.0, Errata.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 48
Menifee Mayor and City Council
February 7, 2024
Page
434 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 1-4 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 49
Menifee Mayor and City Council
February 7, 2024
Page
435 of 1677
2-1
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.0 RESPONSES TO COMMENTS
2.1 REGIONAL AGENCIES
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 50
Menifee Mayor and City Council
February 7, 2024
Page
436 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-2 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 51
Menifee Mayor and City Council
February 7, 2024
Page
437 of 1677
11/8/23 (P:\CIM2106 MVSP EIR\06 Final EIR\Dra� EIR Comments\Riverside Transit Agency.docx) 1
From: Mauricio Alvarez <[email protected]>
Sent: Tuesday, October 24, 2023 3:24 PM
To: Ryan Fowler <[email protected]>
Subject: DEIR - Menifee Valley Specific Plan
[CAUTION]: This email originated from outside of the organiza�on. Do not click links or open atachments unless you recognize the sender and know the content is safe.
Hello Ryan,
Thank you for including Riverside Transit Agency in the review of the DEIR of the proposed Menifee Valley Specific Plan. Although there are no specific projects in the pipeline, please con�nue to include Riverside Transit during the planning phase, as the Agency operates on Highway 74 and it would be beneficial to incorporate public transporta�on elements in the design plans.
Thank you,
Mauricio Alvarez, MBA
Planning Analyst
Riverside Transit Agency
p: 951.565.5260 | e: [email protected]
Website | Facebook | Twitter | Instagram
1825 Third Street, Riverside, CA 92507
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 52
Menifee Mayor and City Council
February 7, 2024
Page
438 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-4
2.1.1 Riverside Transit Agency (RTA)
Comment Code: R-1
Date: October 24, 2023
Response to Comment R-1-1
This comment requests inclusion in future Project planning phases due to the RTA’s operation on Highway 74, and states that public transportation elements would be beneficial to incorporate into future design plans.
The City acknowledges this comment and looks forward to continuing its communication with RTA regarding the future Project planning phases, including future implementing projects.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 53
Menifee Mayor and City Council
February 7, 2024
Page
439 of 1677
You don't often get email from [email protected]. Learn why this is important From: Sahar Ghadimi <[email protected]>
Sent: Tuesday, November 14, 2023 11:46 AM
To: Ryan Fowler <[email protected]>
Cc: Sam Wang <[email protected]>
Subject: Technical data request for the Menifee Valley Specific Plan Project. [CAUTION]: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear Ryan Fowler,
South Coast AQMD staff received the Notice of Availability Draft Environmental Impact Report for the Menifee Valley Specific Plan Project (South Coast AQMD Control Number: RVC231025-01). Staff is currently in the process of reviewing the Draft Environmental Impact Report.
Please provide an electronic copy of any live modeling and emission calculation files (complete files, not summaries) that were used to quantify the air quality impacts from construction and/or operation of the Proposed Project as applicable, including the following:
• CalEEMod,
Input Files (.csv files);
• Live EMFAC output files;
Any emission calculation file(s) (live version of excel file(s); no PDF) used to calculate the Project’s emission sources
(i.e. truck operations).
You may send the above-mentioned files via a Dropbox link in which they may be accessed and downloaded by South Coast AQMD staff by the end of the week. Without all files and supporting documentation, South Coast AQMD staff will be unable to complete a review of the air quality analyses in a timely manner. Any delays in providing all supporting documentation will require additional time for review beyond the end of the comment period.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 54
Menifee Mayor and City Council
February 7, 2024
Page
440 of 1677
If you have any questions regarding this request, please contact me.
Thank you.
Sincerely,
Sahar Ghadimi
Air Quality Specialist, CEQA IGR
Planning, Rule Development & Implementation
South Coast Air Quality Management District
21865 Copley Drive, Diamond Bar, CA 91765
(909) 396-2392
[email protected]
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 55
Menifee Mayor and City Council
February 7, 2024
Page
441 of 1677
2-7
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.1.2 South Coast Air Quality Management District (SCAQMD) Comment Code: R-2
Date: November 14, 2023
Response to Comment R-2-1
This comment provides introductory remarks and states that SCAQMD staff is currently reviewing the Draft EIR.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-2-2
This comment requests full electronic copies of live modeling and emission calculation files used to quantify air quality impacts of the proposed Project and provides examples.
The City provided SCAQMD with the requested files on November 20, 2023.
Response to Comment R-2-3
This comment specifies the platform through which the City should send the requested files, as well as a deadline for the files to be sent in order to provide SCAQMD with adequate review time before the end of the comment period.
The requested files were provided to SCAQMD via Dropbox on November 20, 2023. As such, the requested information was provided to SCAQMD in a timely manner via the requested platform.
After review of the requested information, SCAQMD provided a second comment letter, indexed as comment letter R-5, on December 12, 2023. Although this second comment letter was provided to the City after the close of the public review period on December 4, 2023, responses to comments contained in comment letter R-5 are discussed in Section 2.1.5 of this Final EIR.
Response to Comment R-2-4
This comment provides concluding remarks.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 56
Menifee Mayor and City Council
February 7, 2024
Page
442 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-8 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 57
Menifee Mayor and City Council
February 7, 2024
Page
443 of 1677
November 20, 2023
City of Menifee Community Development
Attention: Ryan Fowler, Principal Planner
29844 Haun Road
Menifee, CA 92586
Subject: EMWD Comments for the Menifee Valley Specifi c Plan Project Noti ce of Availability of a Draft Environmental Impact Report
Location: Generally bounded on the north by State Route 74 and the west by Menifee Road, the south by Burlington Northern Santa Fe railroad tracks, SCE transmission facilities, and Matthews Road, and the east by Briggs Road, in the City of Menifee, Riverside County, California.
Dear Mr. Ryan Fowler:
Eastern Municipal Water District (EMWD) thanks you for the opportunity to comment on the Notice of Availability of a Draft Environmental Impact Report for the Menifee Valley Specific Plan Project (project).
The project proposes the development of a 590.3-acres site as a mixed-use, master-planned community through the appro val of the Menifee Valley Specific P lan (MVSP), divided into 14 planning areas. The southern and eastern portions of the MVSP will accommodate 1,718 housing units, providing a n array of housing types and nei ghborhood amenities, including greenbelts, trails, a public sports park, open space, and an elementary school site. The northern and western portions f the MVSP area are reserved for Civic Node Public Facilities, Business Park, Commercial Business Park, and Commercial areas that will allow uses which foster economic activity and promote growth. A Civic Note positioned in the southwest portion of the MVSP site where the City may locate a fire station, train stop, and/or other needed public or quasi-public uses.
EMWD offers the following comments:
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 58
Menifee Mayor and City Council
February 7, 2024
Page
444 of 1677
EMWD Comments
November 20, 2023
To define the impact(s) on the environment and on existing EMWD facilities, and as development within this area occurs over time, the proponents of implementing development projects shall consult EMWD’s Development Services Department to compare proposed and existing water demands and sewer flows, and prepare a Design Conditions report (DC), formally known as the Plan of Service (POS), to detail all pertinent facilities necessary to serve such implementing development projects, resulting in an approved DC, prior to final design and plan check of such facilities.
To help define EMWD’s Design Conditions, EMWD requires beginning dialogue with project proponents at an early stage in the site design and development, via a one-hour complementary Due Diligence meeting. To set up this meeting the project proponent should complete a Project Questionnaire (form NBD-058) and submit to EMWD. To download this form or for additional information, please visit our web page www.emwd.org, then select the “Developer” link, then select the “New Development Process Forms” link. This meeting will offer the following benefits:
1. Describe EMWD’s development process.
2. Identify project scope and parameters.
3. Provide a preliminary review of the project within the context of existing infrastructure.
4. Discuss potential candidacy for recycled water service.
5. Identify project submittal requirements to start the Design Conditions review.
Following the Due Diligence meeting, and to proceed with a project, the Design Conditions will need to be developed by the developer’s engineer and reviewed/approved by EMWD prior to submitting improvement plans for Plan Check. The DC process and approval will provide the following:
1. Technical evaluation of the project’s demands and existing system capacities.
2. Identification of impacts to existing facilities.
3. Identification of additional on-site and off-site facilities, necessary to serve the project.
4. Identification of easement requirements, if necessary.
5. Identification of potential EMWD’s cost participation in facility oversizing, if applicable.
If you have questions or concerns, please do not hesitate to contact Maroun El-Hage at (951) 928-3777, extension 4468 or by e-mail at [email protected].
Sincerely,
Alfred Javier
Director of Environmental and Regulatory Compliance
ARJ: hs
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 59
Menifee Mayor and City Council
February 7, 2024
Page
445 of 1677
2-11
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.1.3 Eastern Municipal Water District (EMWD)
Comment Code: R-3
Date: November 20, 2023
Response to Comment R-3-1
This comment provides introductory remarks and describes the proposed Project and the potential future uses that would occur on the Project site.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-3-2
This comment states that proponent s of future development projects shall consult EMWD’s Development Services Department and prepare a Design Conditions Report/Plan of Service pertaining to water and sewage facilities necessary for the Project.
The City acknowledges this comment and will ensure that future project proponents adhere to all EMWD requirements. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-3-3
This comment states that the EMWD requires a Due Diligence meeting with future project pro ponents and provides access to a New Development Process Forms link. The comment further lists the benefits of meeting with EMWD.
The City acknowledges this comment and will ensure that future project proponents adhere to all EMWD requirements. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-3-4
This comment describes the process for the development of Design Conditions and provides a list of information that will be required. This comment also provides concluding remarks.
The City acknowledges this comment and will ensure that future project proponents include all required Design Condition components in their Design Conditions. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 60
Menifee Mayor and City Council
February 7, 2024
Page
446 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-12 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 61
Menifee Mayor and City Council
February 7, 2024
Page
447 of 1677
JASON E. UHLEY 1995 MARKET STREET
General Manager-Chief Engineer RIVERSIDE, CA 92501
951.955.1200
951.788.9965 FAX
www.rcflood.org
253810
RIVERSIDE COUNTY FLOOD CONTROL
AND WATER CONSERVATION DISTRICT
November 27, 2023
City of Menifee
Planning Division
29714 Haun Road, Building A
Menifee, CA 92586
Attention: Ryan Fowler Re: PLN 21-0336, PLN 21-0335, PLN 21-0221, PLN 21-0217, PLN 22- 0033, PLN 21- 0338,
Menifee Valley Specific Plan, APNs 331-260-
005, 331-260-006, 331- 260-007, 331- 260-
008, 331- 260-009, 331- 270-005, 331- 280-
005, 331- 290-004, 331- 300-002, 331- 300-
004, 331- 300-005, 331- 300-006, 331- 300-
007, 331- 300-013, 333- 170-006, 331-170-
011, 331-170-012 and 331-170-013
The Riverside County Flood Control and Water Conservation District (District) does not normally recommend conditions for land divisions or other land use cases in incorporated cities. The District also does not plan check City land use cases or provide State Division of Real Estate letters or other flood hazard reports for such cases.
District comments/recommendations for such cases are normally limited to items of specific interest to the District including District Master Drainage Plan facilities, other regiona l flood control and drainage facilities which could be considered a logical component or extension of a master plan system, and District Area Drainage Plan fees (development mitigation fees). In addition, information of a general nature is provided.
The District's review is based on the above- referenced project transmittal, received October 19, 2023. The District has not reviewed the proposed project in detail, and the following comments do not in any way constitute or imply District approval or endorsem ent of the proposed project with respect to flood hazard, public health and safety, or any other such issue:
☐ This project would not be impacted by District Master Drainage Plan facilities, nor are other facilities of regional interest proposed.
☒ This project involves District proposed Master Drainage Plan facilities, namely, Romoland Master Drainage Plan Line A-4, Line A-7 and Line A-5. The District will accept ownership of such facilities on written request by the City. The Project Applicant s hall enter into a cooperative agreement establishing the terms and conditions of inspection, operation, and maintenance with the District and any other maintenance partners. Facilities must be constructed to District standards, and District plan check and inspection will be required for District acceptance. Plan check, inspection, and administrative fees will be required. All regulatory permits (and all documents pertaining thereto, e.g., Habitat Mitigation and Monitoring Plans, Conservation Plans/Easements) that are to be secured by the Applicant for both facility construction and maintenance shall be submitted to the District for review. The regulatory permits' terms and conditions shall be approved by the District prior to improvement plan approval, map recordation, or finalization of the regulatory permits. There shall be no unreasonable constraint upon the District's ability to operate and maintain the flood control facility(ies) to protect public health and safety.
☒ This project proposes channe ls, storm drains larger than 36 inches in diameter, or other facilities that could be considered regional in nature and/or a logical extension a District's facility, the District would consider accepting ownership of such facilities on written request by t he City. The Project Applicant shall enter into a cooperative agreement establishing the terms and conditions of inspection, operation, and maintenance with the District and any other maintenance partners. Facilities must be constructed to District stand ards, and District plan check and inspection will be required for District acceptance.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 62
Menifee Mayor and City Council
February 7, 2024
Page
448 of 1677
City of Menifee - 2 - November 27, 2023
Re: PLN 21-0336, PLN 21-0335, PLN 21-0221, 253810 PLN 21-0217, PLN 22-0033, PLN 21-0338,
Menifee Valley Specific Plan, APNs 331-260
-005, 331-260-006, 331-260-007, 331-260-008,
331-260-009, 331-270-005, 331-280-005,
331-290-004, 331-300-002, 331-300-004, 331
-300-005, 331-300-006, 331-300-007, 331-300
-013, 333-170-006, 331-170-011, 331-170-012
and 331-170-013
EM:ju
Plan check, inspection, and administrative fees will be required. The regulatory permits' terms and conditions shall be approved by the District prior to improvement plan approval, map recordation, or finalization of the regulatory permits. There shall be no unreasonable constraint upon the District's ability to operate and maintain the flood control facility(ies) to protect public health and safety.
☒ This project is located within the limits of the District's Homeland/Romoland Line A and Salt Creek Channel – Winchester/North Hemet Area Drainage Plans for which drainage fees have been adopted; applicable fees should be paid by cashier's check or money order only to the Flood Control District or City prior to issuance of grading permits. Fees to be paid should be at the rate in effect at the time of issuance of the actual permit.
☒ An encroachment permit shall be obtained for any construction related activities occurring within District right of way or facilities, namely, Romoland Master Drainage Plan Line A. The District should be identified in Table 3.B: Probable Future Actions by Responsible/Trustee Agencies. If a proposed storm drain connection exceeds the hydraulic performance of the existing drainage facilities, mitigation will be required. For further information, contact the District's Encroachment Permit Section at 951.955.1266.
☒ The District's previous comments dated March 13, 2019 for case Menifee Valley Ranch Specific Plan Amendment SPA 2018-182, Menifee Valley Specific Plan SP 2018-181 are still valid.
GENERAL INFORMATION
This project may require a National Pollutant Discharge Elimination System (NPDES) pe rmit from the State Water Resources Control Board. Clearance for grading, recordation, or other final approval should not be given until the City has determined that the project has been granted a permit or is shown to be exempt.
If this project involves a Federal Emergency Management Agency (FEMA) mapped floodplain, then the City should require the applicant to provide all studies, calculations, plans, and other information required to meet FEMA requirements, and should further require that the applicant obtain a Conditional Letter of Map Revision (CLOMR) prior to grading, recordation, or other final approval of the project and a Letter of Map Revision (LOMR) prior to occupancy.
The project proponent shall bear the responsibility for complying with all applicable mitigation measures defined in the California Environmental Quality Act (CEQA) document (i.e., Negative Declaration, Mitigated Negative Declaration, Environmental Impact Report) and/or Mitigation Monitoring and Reporting Program, if a CEQA document was prepared for the project. The project proponent shall also bear the responsibility for complying with all other federal, state, and local environmental rules and regulations that may apply.
If a natural watercourse or mapped floodplain is impacted by this project, the City should require the applicant to obtain a Section 1602 Agreement from the California Department of Fish and Wildlife and a Clean Water Act Section 404 Permit from the U.S. Army Corps of Engineers, or written correspondence from th ese agencies indicating the project is exempt from these requirements. A Clean Water Act Section 401 Water Quality Certification may be required from the local California Regional Water Quality Control Board prior to issuance of the Corps 404 permit.
Very truly yours,
AMY MCNEILL
Engineering Project Manager
Attachment
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 63
Menifee Mayor and City Council
February 7, 2024
Page
449 of 1677
JASON E. UHLEY
General Manager-Chief Engineer
1995 MARKET STREET
RfVERSIDE, CA 92501
951.955.1200
FAX 951 .788.9965
www.rcflood.org
RIVERSIDE COUNTY FLOOD CONTROL
AND WATER CONSERVATION DISTRICT
224837
City of Menifee
Planning Division
29714 Haun Road, Building A
Menifee, CA 92586
Attention: Brenna Weatherby
March 13, 2019
Re: Menifee Valley Ranch Specific Plan
Amendment SPA 2018-182 , Menifee Valley
Specific Plan SP20 18-181
The District does not normally recommend conditions for land divisions or other land use cases in incorporated cities. The District also does not plan check City land use cases, or provide State Division of Real Estate letters or other flood hazard reports for such cases. District comments/recommendations for such cases are normally limited to items of specific interest to the District including District Master Drainage Plan facilities, other regional flood control and drainage facilities which could be considered a logical component or extension of a master plan system, and District Area Drainage Plan fees (development mitigation fees). In addition , information of a general nature is provided.
The District's review is based on the above-referenced project transmittal , received March 11 , 2019. The District has not reviewed the proposed project in detail, and the following comments do not in any way constitute or imply District approval or endorsement of the proposed project with respect to flood hazard, public health and safety, or any other such issue:
~ This project would not be impacted by District Master Drainage Plan facilities , nor are other facilities of regional interest proposed.
D This project involves District proposed Master Drainage Plan facilities, namely . The District will accept ownership of such facilities on written request of the City. Facilities must be constructed to District standards, and District plan check and inspection will be required for District acceptance . Plan check, inspection, and administrative fees will be required.
This project proposes channels, storm drains 36 inches or larger in diameter , or other facilities that could be considered regional in nature and/or a logical extension of the adopted Romoland Master Drainage Plan. The District would consider accepting ownership of such facilities on written request of the City. Facilities must be constructed to District standards, and District plan check and inspection will be required for District acceptance. Plan check, inspection , and administrative fees will be required.
~ This project is located within the limits of the District's Homeland/Romoland - Line A and Salt Creek Channel- Winchester/North Hemet Area Drainage Plans for which drainage fees have been adopted; applicable fees should be paid by cashier's check or money order only to the Flood Control Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 64
Menifee Mayor and City Council
February 7, 2024
Page
450 of 1677
City of Menifee - 2 -
Re: Menifee Valley Ranch Specific Plan
Amendment SPA 2018-182, Menifee Valley
Specific Plan SP20 18-181
March 13, 2019
224837
District or City prior to issuance of grading permits. Fees to be paid should be at the rate in effect at the time of issuance of the actual permit.
0 An encroachment permit shall be obtained for any construction related activities occurring within District right of way or facilities, namely, . For further information, contact the District's Encroachment Permit Section at 951.955.1266. 0 The District's previous comments are still valid.
GENERAL INFORMATION
This project may require a National Pollutant Discharge Elimination System (NPDES) permit from the State Water Resources Control Board. Clearance for grading, recordation, or other final approval should not be given until the City has determined that the project has been granted a permit or is shown to be exempt.
If this project involves a Federal Emergency Management Agency (FEMA) mapped floodplain, then the City should require the applicant to provide all studies, calculations, plans, and other information required to meet FEMA requirements, and should further require that the applicant obtain a Conditional Letter of Map Revision (CLOMR) prior to grading, recordation, or other final approval of the project and a Letter of Map Revision (LOMR) prior to occupancy.
If a natural watercourse or mapped floodplain is impacted by this project, the City should require the applicant to obtain a Section 1602 Agreement
from the California Department of Fish and Wildlife and a Clean Water Act Section 404 Permit from the U.S. Army Corps of Engineers, or written correspondence from these agencies indicating the project is exempt from these requirements. A Clean Water Act Section 401 Water Quality Certification may be required
from the local California Regional Water Quality Control Board prior to issuance of the Corps 404 permit.
c: Riverside County Planning Department
Attn: Jason Killebrew
HY:blm
Very truly yours,
DEBORAH DE CHAMBEAU
Engineering Project Manager
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 65
Menifee Mayor and City Council
February 7, 2024
Page
451 of 1677
2-17
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.1.4 Riverside County Flood Control and Water Conservation District (District) Comment Code: R-4
Date: November 27, 2023
Response to Comment R-4-1
This comment provides context as to the District’s typical recommendations for land division cases, which are limited to flood control and drainage facilities, fees, and general information, and states that the comment is not equivalent to an endorsement of the Project.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-4-2
This comment states that the proposed Project involves District proposed Master Drainage Plan facilities, namely Romoland Master Drainage Plan Line A -4, Line A -7, and Line A -5. The comment further describes procedures for the City and Applicant to follow for the District to accept ownership of such facilities, including entering into a cooperative agreement, constructing facilities to District standards, and submitting regulatory permits to the District for approval.
The City acknowledges this comment and will ensure that all required procedures are followed by Applicants. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-4-3
This comment states that the proposed Project proposes channels, large storm drains, or other extensions of District facilities and describes procedures for the City and Applicant to follow for the District to accept ownership of such facilities, including entering into a cooperative agreement, constructing facilities to District standards, and submitting regulatory permits to the District for approval.
The City acknowledges this comment and will ensure that all required procedures are followed by Applicants.
Response to Comment R-4-4
This comment states that the proposed Project is located within the limits of the District’s Homeland/Romoland Line A and Salt Creek Channel – Winchester/North Hemet Area Drainage Plans, for which drainage fees have been adopted, which shall be paid at the rate in effect at the time of issuance of the actual permit.
The City acknowledges this comment and will ensure that all required fees are paid prior to the issuance of grading permits. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 66
Menifee Mayor and City Council
February 7, 2024
Page
452 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-18 Response to Comment R-4-5
This comment states that an encroachment permit shall be required for construction -related activities occurring within District right -of-way, and that the District should be identified in Table
3.B: Probable Future Actions by Responsible/Trustee Agencies of the Draft EIR.
The City acknowledges this comment and will ensure that all necessary permits are obtained. The addition of the District to Table 3.B: Probable Future Actions by Responsible/Trustee Agencies has been reflected in Chapter 3.0, Errata, of this Final EIR. No additional revisions were made in response to this comment. This change is a generally minor change that does not constitute significant new information, change the conclusions of the environmental analysis, or require recirculation of the document (State CEQA Guidelines Section 15073.5).
Response to Comment R-4-6
This comment states that the District’s previous comments dated March 13, 2019, for the Menifee Valley Ranch Specific Plan Amendment SPA 2018 -182, Menifee Valley Specific Plan SP 2018 -181 are still valid.
The City has included the District’s comments dated March 13, 2019, as an attachment to Comment Letter R-4. Please refer to Response to Comment R-4-8.
Response to Comment R-4-7
This comment provides general information regarding potential project requirements and permits including the National Pollutant Discharge Elimination System (NPDES) , Federal Emergency Management Agency (FEMA), CEQA, California Department of Fish and Wildlife, and Clean Water Act.
The City acknowledges this comment and will ensure that all necessary regulatory procedures are followed and that required permits are obtained. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-4-8
This letter dated March 13, 2019, contains District comments on the Menifee Valley Ranch Specific Plan Amendment SPA 2018 -182, Menifee Valley Specific Plan SP 2018 -181, which Comment R -4-6 states are still valid.
The comments presented in this letter have been addressed in Responses to Comments R -4-1 through R-4-7 above. As such, no further response is required.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 67
Menifee Mayor and City Council
February 7, 2024
Page
453 of 1677
SENT VIA E-MAIL: December 12, 2023
[email protected]
Ryan Fowler, Principal Planner
City of Menifee, Community Development Department
29844 Haun Road
Menifee, CA 92586
Notice of Availability of a Draft Environmental Impact Report (EIR) for the Menifee Valley Specific Plan Project (Proposed Project)
South Coast Air Quality Management District (South Coast AQMD) staff appreciates the opportunity to review the above -mentioned docu ment. The City of Menifee is th e California Environmental Quality Act (CEQA) Lead Agency for the Proposed Project. To provide context, South Coast AQMD staff has provided a brief summary of the project information and prepared the following comments which are organized by topic of concern.
South Coast AQMD Staff’s Summary of Project Information in the Draft EIR
Based on the Draft EIR, the Proposed Project consists of constructing 1,718 residential units, 275.5 acres of business park uses, 32.1 acres of commercial uses, 33.3 acres of p ublic facilities,
19.6 acres of roadway improvements, and 44.5 acres allocated for open space. The project comprises 590.3 acres of land and approximately 59 acres of off -site improvements necessary to provide access and utilities to the project. The first set of off -site improvements includes roadway improvements to existing roadways , utility connections, landscaping, and construction of a non -vehicular bridge. The second off -site roadway improvements include widening and additional turn lanes to address traffic impacts.1
Regional access to the Project site is provided by State Route 74 (SR -74), which is located adjacent to the northern boundary of the Project site, and Interstate 215 (I -215), which is located approximately 2 miles west of the Project site .2 Based on a review of aerial photographs, South Coast AQMD staff found that th e nearest sensitive receptor (residenti al development) is located adjacent to t he Proposed Project site, approximately 135 feet west and south of t he Proposed Project. 3 Construction of the Proposed Project is anticipated to occur in three phases, commencing in October 2023 and being completed in April 2030. 4 The project is located on the northeast corner of Matthews Road and Menifee Road.5
South Coast AQMD Staff’s Comments
Overlapping Construction and Operational Activities
1 Draft EIR p. 23.
2 Ibid. p. 23.
3 Ibid. p. 229.
4 Ibid. p. 79.
5 Ibid. p. 23.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 68
Menifee Mayor and City Council
February 7, 2024
Page
454 of 1677
Ryan Fowler December 12, 2023
Considering that the Proposed Project consists of two construction phases over the course of 7 years of construction, the Draft EIR does not analyze the scen ario of overlapping between the construction and operational activities. Therefore, South Coast AQMD staff recommends that the Lead Agency revise the air quality analysis sec tion to consider the overlapping const ruction and operation. The es timated overlap ped emissions should then be compared to South C oast AQMD’s regional air quality CE QA operational thresholds to determine their leve l of significance, which should be included in the Final EIR.
Discrepancies Between Draft EIR and CalEEMod Modeling Data in Overall Air Quality Impact Analysis for on-site Construction emissions
Table 4.3.F and Table 4.3.G in the Air Quality section in the Draft EIR show the Unmitigated and Mitigated On -site Improvements Construction Emissions (lb/day). 6 Based on the review of the CalEEMod technical files provided, it app ears that the pollutant emissions for ROG, NOx, CO, SO2, PM10, and PM2.5 in Table 4.3.F and Table 4.3.G do not match the corresponding pollutant emission in the CalEEMod technical files ( refer to Page 97 of the Draft EIR). Please provide an explanation for this discrepancy and revise the cons truction emissions analyses for the mentioned pollutants.
Inconsistencies in Land Use Lot Acreage: A Comparison Between CalEEMod and Draft EIR Documentation
In accordance with the Draft EIR, the Pr oject’s Land Use Plan would divide the 590.3 -acreage property into 14 “Planning Areas” to accommodate 1,718 residential units, business park, business park, commercial areas, and civic uses. According to Table 3.A: Summary of Land Uses, the total land use designation for Residential (R) is 202.3 acres. However, the total residential land use in both Phase 1 and Phase 2 of the project used in the CalEEMod modeling is 185 lot acre s. A similar inconsistency is observed in the Business Park (BP) l and use figures between the Draft EIR document and the CalEEMod modeling assumptions, specifically in terms of total lot acreage. This inconsistency leads to the underestimation of emissions for different types of land use. Therefore, it is recomme nded that the Lead Agency provide an explanation for this discrepancy between the Draft EIR and the CalEEMod modeling.
Multiple plot files for the individual sources in the AERMOD modeling
South Coast AQMD staff's review of the construction AERM OD and HRA files noted in the Construction.AD folder, 14 different plot files are the model output from the 14 individual area poly sources for the diesel particulate matters (DPM) . However, there is n o plot file evaluated the combined concentrations from all 14 poly area sources to represent the cumulative construction impacts. The Lead Agency is recommended to revise and rerun the AERMOD model, selecting the 'Include Group All' tab in t he source section , to combine the data into one comprehensive plot file for all 14 sources.
Air Quality Mitigation Measures for NOx and PM Emissions from Construction
6 Ibid. p. 215.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 69
Menifee Mayor and City Council
February 7, 2024
Page
455 of 1677
Ryan Fowler December 12, 2023
Although the Proposed Project has committed to adopt Tier 4 technology for the equipment during project construction ph ase in the Draft EIR , given the long -range plan of the Propos ed Project from year 2023-2030, Tier 4 technology may not be the cleanest technology when construction occurs later for individual projects. According to the CARB Strategies for Reducing Emissions from Off -Road Construction Equipment, the implementation of off -road Tier 5 starting in 2027 or 2028 and the Governor’s Executive Order in September 2020 requires CARB to develop and propose a full transition to Zero Emissions (ZE) by 2035.7 Considering the scope of the project, it is crucial to ensure that the levels of construction emissions, specifically NOx and PM10, remain below significant thresholds during the construction period for each proposed individual project. Moving towards achieving this goal, where feasible, involve s opting for electric emission -free en gines instea d o f diese l-fueled engines for the c onstruction equipment.
This proactive choice not only aligns with e nvironmental concer ns but also demons trates a commitment to minimizing the project's environmental footprints. The abatement of NOx can also be pursued by enforcing greener constructions, s uch as, limiting the usage of older engines in favor of adopting the latest available technologies, or even incorporating exhaust retrofits such as cutting-edge exhaust aftertreatment techniques. Additionally, several other resources to assist the Le ad Age ncy with identifyi ng additional potential mitigation measures for t he Proposed Project are included in t he South Coast AQMD’s CEQA Air Quality Han dbook 8 for both operational and construction emissions.
Additional Recommended Air Quality and Greenhouse Gases Mitigation Measures
CEQA requires that all feasible mitigation measures that go beyond what is requ ired by law be utilized to minimize or eliminate any significant adverse air quality impacts. To further reduce the Proposed Project’s air quality impacts, and in addition to SWIP SP FEIR Mitigation Measures MM 4 .2-1a to MM 4.2 -1f, MM 4.2 -2a to MM4.2 -2l, and MM 4.2 -5a, South Coast AQMD staff recommends that the Lea d Agency incorporate the following miti gation measures in the Final EIR.
Mitigation measures for operational air quality impacts from mobile sources that the Lead Agency should consider in the Draft EIR may include the following:
• Require ZE or near-zero emission (NZE) on -road haul trucks, such as heavy-duty trucks with natural gas engines that meet the CARB’s adopted optional NOx emissions standard at 0.02 grams per brake horsep ower-hour (g/bh p-hr), if and when feasible. Given the state’s clean truck rules and regulations aimi ng to accelerate the utilization and market penetration of ZE and NZE trucks , such as the Advanced Clean Trucks Rule 9 and the Heavy-duty Low NOx Omnibus Reg ulation, 10 ZE an d NZE trucks will become
7 Presentation can be found at:
http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/2022- air-quality- management-plan/combined-construction-carb-amp-aqmp-presentations-01-27-21.pdf 8 https://www.aqmd.gov/home/rules-compliance/ceqa/air-quality-analysis-handbook 9 CARB. June 25, 2020. Advanced Clean Trucks Rule. Accessed at: https://ww2.arb.ca.gov/our-work/programs/advanced- cleantrucks.
10 CARB has recently passed a variety of new regulations that require new, cleaner heavy-duty truck technology to be sold and used in the state. For example, on August 27, 2020, CARB approved the Heavy-Duty Low NOx Omnibus Regulation, which will Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 70
Menifee Mayor and City Council
February 7, 2024
Page
456 of 1677
Ryan Fowler December 12, 2023
increasingly more available to use. The Lead Agency should require a phase -in schedule to incentivize the use of these cleaner operating trucks to reduce any significant adverse air quality impacts. South Coast AQMD staff is availa ble to discuss the availability of current and upcoming truck technologies and incent ive programs with the Lead Agency.
At a minimum, require the use of a 2010 model year 11 that meets CARB’s 2010 engine emissions standards at 0.01 g/bhp -hr of particulate ma tter (PM) and 0.20 g/bhp -hr of NOx emissions or newer, cleaner trucks. All heavy-duty haul trucks should meet CARB’s lowest optional low -NOx standard starting in 2022. 12 Where appropriate, include environmental analyses to ev aluate and identi fy sufficient e lectricity and supportive infrastructures in t he Energy and Utilities and Service Sys tems Sections in the CEQA document. Include the requirement in applicable bid documents, purchase orders, and contracts. Operators shall maintain records of all trucks ass ociated with project construction to document that each truck used meets these emission standards and make the records available for inspection. The Lead Agency should conduct regular inspections to the maximum extent feasible to ensure compliance.
• Limit the daily number of trucks allowed at the Proposed Project to levels analyzed in the Final CEQA document. If higher daily truck volumes are anticipated to visit the site, the Lead Agency should commit to re -evaluating the Proposed Project th rough CEQA prio r to allowing this higher activity level.
• Provide electric vehicle (EV) charging stations or, at a minimum, provide electrical infrastructure, and electrical panels should be appropriately sized. Electrical hookups should be provided for truckers to plug in any onboard auxiliary equipment.
Mitigation measures for operational air quality impacts from other area sources that the Lead Agency should consider in the Draft EIR may include the following:
• Maximize the use of solar energy by installing solar energy arrays. • Use light-colored paving and roofing materials.
• Utilize only Energy Star heating, cooling, and lighting devices and appliances.
Design considerations for the Proposed Project that the Lead Agency should consider reducing air quality and health risk further impacts include the following:
• Clearly mark truck routes with trailblazer signs so that trucks will not travel next to or near sensitive land uses (e.g., residences, schools, daycare centers, etc.). • Design the Proposed Project such that truck entrances and exits are not facing sensitive receptors and trucks will not travel past sensitive land uses to enter or leave the Proposed Project site.
• Design the Proposed Project such that any truck check-in point is inside the Proposed Project site to ensure no trucks are queuing outside.
require all trucks to meet the adopted emission standard of 0.05 g/hp-hr starting with engine model year 2024. Accessed at:
https://ww2.arb.ca.gov/rulemaking/2020/hdomnibuslownox. 11 CARB adopted the statewide Truck and Bus Regulation in 2010. The Regulation requires diesel trucks and buses that operate in California to be upgraded to reduce emissions. Newer heavier trucks and buses must meet particulate matter filter requirements beginning January 1, 2012. Lighter and older heavier trucks must be replaced starting January 1, 2015. By January 1, 2023, nearly all trucks and buses will need to have 2010 model year engines or equivalent. More information on the CARB’s Truck and Bus Regulation is available at: https://www.arb.ca.gov/msprog/onrdiesel/onrdiesel.htm. 12 CARB’s optional low-NOx emission standard is available at: https://ww2.arb.ca.gov/our-work/programs/optional-reduced- nox-standards.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 71
Menifee Mayor and City Council
February 7, 2024
Page
457 of 1677
Ryan Fowler December 12, 2023
• Design the Proposed Project to ensure that truck traffic inside the Proposed Project site is as far away as feasible from sensitive receptors.
• Restrict overnight truck parking in sensitive land uses by providing overnight truck parking inside the Proposed Project site.
Health Risk Reduction Strategies
Many strategies are a vailable to reduce exposure s, including, but ar e not limited to, building filtration systems with MERV 13 or bet ter, or i n some c ases, MERV 15 o r better is recommended; building design, orie ntation, location; vegetation barriers or landscaping screening, etc. Enhanced filtration units are capable of re ducing exposures. However, enh anced filtration systems have limitations. F or example, in a study that South Coast AQMD conducted to investigate filters13, a cost burden is expected to be w ithin the range of $12 0 to $240 per year to replace each filter panel . The initial start -up cost co uld substantially increase if an HV AC system needs to be installed and if standalone filter units are required. Installation costs may vary and include costs for conducting site a ssessments and obtaining permits and approvals before filters can be installe d. Other costs may include filter life monit oring, annual maintenance, and training for conducting maintenance and reporting. In addition, because the filter s would not have any e ffectiveness unless the HVAC system is running, there may be increased energy consumption that the Lead Agency s hould evaluate in the Final EIR. It is typically assumed that the filters oper ate 100 percent of the time while residents are indoors, and the environmental analysis does not generally account for the times when the residents have their windows or doors open or are in common space areas of the project. These filters have no ability to filter out any toxic gases. Furthermore , when used filters ar e replaced, replacement has the potential to result in emissions from the transportation of used filters at dispos al sites and generate solid waste that the Lead Agency should evaluate in the Final EIR. Therefore, the presumed effectiveness and feasibility of any fi ltration units should be carefully evaluated in more detail prior to assuming that they will sufficiently alleviate exposures to diesel particulate matter emissions.
South Coast AQMD Air Permits and Role as a Responsible Agency
If the implementation of the Pr oposed Project would require t he use of new stationary and portable sources, includ ing but not lim ited to emerg ency generators, fire water pumps, boilers, spray booths, and etc ., air permits fr om South Coast AQMD will be required and the role of South Coast AQMD would change from a Commenting A gency to a Resp onsible Agency under CEQA. In addition, i f South Coast AQ MD is identified as a Responsible Agency, per CEQA Guidelines Sections 15086, the Lead Agency is required to consult with South Coast AQMD. In addition, CEQA Guidelines Section 15096 se ts forth s pecific procedures for a R esponsible Agency, including making a decision on the adequacy of the CEQA document for use as part of evaluating the applications for air permits . For th ese reasons, t he Final EIR should in clude a discussion about any new stationery and portable equipment requiring South Coas t AQMD air permits and identify South Coast AQMD as a Responsible Agency for the Proposed Project.
13 This study evaluated filters rated MERV 13 or better. Accessed at: http://www.aqmd.gov/docs/default- source/ceqa/handbook/aqmdpilotstudyfinalreport.pdf. Also see 2012 Peer Review Journal article by South Coast AQMD:
https://onlinelibrary.wiley.com/doi/10.1111/ina.12013.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 72
Menifee Mayor and City Council
February 7, 2024
Page
458 of 1677
Ryan Fowler December 12, 2023
The Final EIR should also include calculations and an alyses for construction and operation emissions for the new stationary and portable sources, as this inf ormation will also be relied upon as the ba sis for t he permit condi tions and emission limits for the air permit(s) . Pl ease contact South C oast AQMD’s E ngineering and Permitting staff at (909) 396-3385 for questions regarding what types of eq uipment would require air permits. For more general information on permits, please visit South Coast AQMD’s webpage at: http://www.aqmd.gov/home/permits.
Conclusion
As set for th i n California Public Resour ces Code Secti on 21092.5(a) and CEQA Guidelines Section 15088 (a-b), the Lead Agen cy shall evaluate co mments from public agencies on the environmental issues and prepare a written response at least 10 days prior t o certifying the Final EIR. As such, please provide South Coast AQMD written responses to all comments contained herein at least 10 days prior to the certification of the Final EIR. In addition, as provided by CEQA Gu idelines Section 15088(c) , if the Lead Agency’s p osition is at v ariance with recommendations provided in th is comment letter, detailed reasons s upported by substantial evidence in the record to explain why specific comments and sugges tions are not accepted must be provided.
Thank you for the opportunity to provide comments. South Coast AQMD staff i s available to work wi th the Lead Agency to addre ss any air quality questions that may ar ise from this comment letter. Please contact Sahar Ghadim i, Air Qual ity Specialist, at [email protected] should you have any questions.
Sincerely,
Sam Wang
Sam Wang
Program Supervisor, CEQA IGR
Planning, Rule Development & Implementation
SG:SW
RVC231025-01
Control Number
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 73
Menifee Mayor and City Council
February 7, 2024
Page
459 of 1677
2-25
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.1.5 South Coast Air Quality Management District (SCAQMD) Comment Code: R-5
Date: December 12, 2023
Response to Comment R-5-1
This comment is introductory and provides a description of the proposed Project including Project location, proposed uses, construction schedule, and the identification of the nearest sensitive receptor to the Project site.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment R-5-2
This comment states that since the proposed Project consists of two construction phases over the course of 7 years of construction, the air quality analysis should consider the overlapping construction and operation and be compared to the SCAQMD’s operational thresholds.
As stated on pages 4.3 -31 and 4.3 -32 of the Draft EIR, the exact timing of implementation and phasing for any Planning Area may vary based on a number of factors, including market and economic demands, as well as physical constraints or timing of infrastructure improvements. The final phasing for the development will be determined through future implementing projects and any phasing requirements specified in a Development Agreement that accompanies this Specific Plan. As such, it is possible that construction activities would still be underway while parts of the proposed Project become operational. Since the Project is a programmatic level document and the timing of projects that would be developed under the Specific Plan are unknown at this time, the precise combination of emissions that would occur is unknown. However, since operational emissions would exceed SCAQMD thresholds, it is assumed that combined emissions would also exceed the significance threshold established by the SCAQMD for daily project emissions. In addition, as stated on page 4.3 -32 of the Draft EIR, while Mitigation Measure AIR -2 would significantly reduce criteria air pollutant emissions generated during operational activities associated with the on -site improvements, there is currently not enough information to quantify emissions of specific project development that may occur under the proposed Project. Without quantification to guarantee a less than significant finding, future development projects may still exceed the SCAQMD regional significance thresholds. Therefore, the Draft EIR determined that emissions related to operational activities would be considered significant and unavoidable. As such, this comment does not identify any new significant environmental issues or impacts that were not already addressed in the Draft EIR.
Response to Comment R-5-3
This comment claims that Table 4.3.F and Table 4.3.G of the Draft EIR do not match the corresponding pollutant emissions in the California Emissions Estimator Model (CalEEMod) output files. This comment requests an explanation for this discrepancy or to revise the construction emissions analyses for the mentioned pollutants.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 74
Menifee Mayor and City Council
February 7, 2024
Page
460 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-26 As discussed on page 4.3-26 of the Draft EIR, the construction schedule for each phase was based on information provided by the Project Applicant, which assumes that mass grading would occur from the fourth quarter of 2023 through the third quarter of 2024, construction of Phase 1 would occur from the fourth quarter of 2024 through the second quarter of 2030, construction of Phase 2 would occur from the third quarter of 2026 through the second quarter of 2031, and construction of Phase 3 would occur from the third quarter of 2027 through the first quarter of 2029, which was included in CalEEMod. Each phase was modeled in a separate CalEEMod run. As the SCAQMD’s thresholds are based on maximum pollutant emissions in pounds per day, the highest daily emissions from each year of construction are included in Table 4.3.F and Table 4.3.G of the Draft EIR consistent with SCAQMD thresholds. Therefore, the reason the emissions in Tables 4.3.F and 4.3.G may appear to not match the CalEEMod output is due to each phase of construction being modeled separately. The highest daily emissions from each year of construction were calculated in Excel based on the CalEEMod results. As such, the emissions included in Table 4.3.F and Table 4.3.G accurately represent the proposed Project’s construction emissions and no revisions to the Draft EIR are required.
Response to Comment R-5-4
This comment states that according to Table 3.A: Summary of Land Uses of the Draft EIR, the total land use designation for Residential (R) is 202.3 acres. This comment also claims that CalEEMod shows that the total residential land use in both Phase 1 and Phase 2 of the Project used in the CalEEMod modeling is 185 lot acres. This comment states that a similar inconsistency is observed in the Business Park (BP) land use figures between the Draft EIR document and the CalEEMod modeling assumptions. This comment recommends providing an explanation for this discrepancy between the Draft EIR and the CalEEMod modeling.
As shown in Table 3.A in the Draft EIR, the total residential land use category is 202.3 acres ; however, this acreage includes both Residential (R) and School (S) land uses. As shown in the CalEEMod outputs, the school land use is separated from the residential land use in CalEEMod.
In CalEEMod, Phase 1 includes 103.8 acres of single -family residential and Phase 2 includes 54.5 acres of single-family residential, 28.5 acres of multi -family residential, and 15.5 acres of school uses, totaling 202.3 acres (consistent with Table 3.A).
Similarly, as shown in Table 3.A in the Draft EIR, the total business park category is 311.1 acres ; however, this acreage includes Public Facilities (Civic Node) (PF), Business Park (BP), Commercial – Business Park (C-BP), and Commercial (C) land uses. As shown in the CalEEMod outputs, these uses are represented by Government (Civic Center), Industrial Park, and Regional Shopping Center uses in CalEEMod. In CalEEMod, Phase 3 includes 5.3 acres of Government (Civic Center), 263.2 acres of Industrial Park, and 42.6 acres of Regional Shopping Center uses, totaling 311.1 acres (consistent with Table 3.A).
Therefore, the acreages in CalEEMod are consistent with Table 3.A: Summary of Land Uses of the Draft EIR and no revisions to the Draft EIR are required.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 75
Menifee Mayor and City Council
February 7, 2024
Page
461 of 1677
2-27
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Response to Comment R-5-5
This comment states that for the construction health risk assessment (HRA), there are 14 different plot files for the model output from the 14 individual area poly sources for the diesel particulate matter (DPM) and that there is no plot file for the combined concentrations from all 14 poly area sources to represent the cumulative construction impacts. This comment recommends revising and rerunning AERMOD, selecting the 'Include Group All' tab in the source section, to combine the data into one comprehensive plot file for all 14 sources. The risk was not modeled in AERMOD. AERMOD was used to calculate the normalized emission concentrations (using 1 gram per second) to determine a normalized emission concentration. Those files were then incorporated into the HARP model to calculate the combined risk for each receptor from all sources modeled. This methodology is consistent with the Office of Environmental Health Hazard Assessment (OEHHA) 2015 Guidelines as cited in the Draft EIR. As such, the model does not need to be revised.
Response to Comment R-5-6
This comment states that although the proposed Project has committed to adopt Tier 4 technology for the equipment during the Project construction phase in the Draft EIR, given the long -range plan of the proposed Project from 2023 to 2030, Tier 4 technology may not be the cleanest technology when construction occurs later for individual projects. In addition, this comment asserts that the implementation of off-road Tier 5 equipment starting in 2027 or 2028 and the Governor’s Executive Order in September 2020 requires the California Air Resources Board ( CARB) to develop and propose a full transition to Zero Emissions (ZE) by 2035. This comment states that the proposed Project should incorporate these measures to reduce levels of construction emissions.
As shown in Table 4.3.G, Table 4.3.H, and Table 4.3.I of the Draft EIR, with implementation of Tier 4 construction equipment, as required by Mitigation Measure AIR -1, the emissions associated with construction of the on -site and off -site improvements would be below SCAQMD thresholds and would result in a less than significant impact related to a cumulatively considerable net increase of any criteria pollutant for which the Project region is in nonattainment under an applicable federal or State ambient air quality standard.
In addition, an HRA was prepared for the proposed Project and evaluates construction-period health risk to off-site receptors. The results of the construction HRA are presented on pages 4.3-41 through
4.3-43 of the Draft EIR. Based on the results of the construction HRA, as shown in Table 4.3.N and Table 4.3.O, although construction of the proposed on -site improvements would not result in a significant construction health risk impact, implementation of Mitigation Measure AIR -1 would be required to ensure the Project contractors will utilize Tier 4 Final construction equipment to reduce construction criteria pollutant emissions, which would also reduce construction -related health risk impacts.
Furthermore, the air quality analysis utilized CalEEMod to quantify the criteria pollutant emissions for both construction and operation of the proposed Project, as recommended by the SCAQMD. The cleanest available tier for construction equipment in CalEEMod is Tier 4 Final equipment, which was used in this analysis. Tier 5 construction equipment is not available in CalEEMod. As such, since impacts would be less than significant with the implementation of Mitigation Measure AIR -1, Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 76
Menifee Mayor and City Council
February 7, 2024
Page
462 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-28 identification and analysis of additional mitigation, such as Tier 5 or ZE construction equipment, is not required.
Response to Comment R-5-7
This comment recommends including additional mitigation measures such as requiring ZE or near - zero emission (NZE) on-road haul trucks, limiting the daily number of trucks at the proposed Project, and providing electric vehicle (EV) charging stations, including electrical hookups for trucks.
Truck trip generation estimates used in the analysis were based on the Project’s trip generation estimates, which assume that industrial uses associated with Phase 1 would generate approximately 10,380 total average daily trips with 8,197 passenger vehicle trips, 555 two -axle truck trips, 392 three-axle truck trips, and 1,236 four -axle truck trips; industrial uses associated with Phase 2 would generate approximately 7,434 total average daily trips with 5,872 passenger vehicle trips, 396 two - axle truck trips, 280 three-axle truck trips, and 886 four-axle truck trips (refer to Appendix K-1 of the Draft EIR for trip generation estimates).
Additionally, as shown on pages 4.3 -35 through 4.3 -38 of the Draft EIR, Mitigation Measure AIR -2 requires that prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the emission reduction measures, including the following measures:
• All Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, construction equipment, and generators). • Project Applicants for manufacturing and light industrial uses that require refrigerated vehicles shall install an adequate number of electrical service connections at loading docks for plugging in the anticipated number of refrigerated trailers to reduce idling time and emissions. • Project Applicants shall install 240 -volt electrical outlets or Level 3 chargers in parking lots that would enable charging of neighborhood electric vehicles (NEVs) and/or battery powered vehicles.
As such, the measures recommended in this comment are consistent with measures that have already been included as part of Mitigation Measure AIR-2.
Response to Comment R-5-8
This comment recommends that the Draft EIR identify additional mitigation measures such as maximizing the use of solar energy by installing solar energy arrays, using light -colored paving and roofing materials, and utilizing only Energy Star heating, cooling, and lighting devices and appliances.
As shown on pages 4.3 -35 through 4.3 -38 of the Draft EIR, Mitigation Measure AIR -2 requires that prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the emission reduction measures, including the following measures:
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 77
Menifee Mayor and City Council
February 7, 2024
Page
463 of 1677
2-29
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) • All Project Applicants shall incorporate fuel -efficient heating equipment and other appliances, such as water heaters, swimming pool heaters, cooking equipment, refrigerators, furnaces, boiler units, and low or zero -emitting architectural coatings. Project Applicants shall utilize only Energy Star heating, cooling, and lighting devices, and appliances, consistent with CALGreen requirements applicable at the time of development applications. • All Project Applicants shall utilize energy -efficient design features, including appropriate site orientation, use of lighter color roofing and building materials, and use of deciduous shade trees and windbreak trees to reduce fuel consumption for heating and cooling. • Project Applicants shall maximize use of solar energy including solar panels, including installing the maximum possible number of solar energy arrays on the building roofs to generate solar energy.
As such, the measures recommended in this comment have already been included as part of Mitigation Measure AIR-2 and no revisions to the Draft EIR are required.
Response to Comment R-5-9
This comment recommends that the Draft EIR identify additional mitigation measures such as the following: marking truck routes with trailblazer signs so that trucks will not travel next to or near sensitive land uses; designing the proposed Project such that truck entrances and exits are not facing sensitive receptors and trucks will not travel past sensitive land uses to enter or leave the Project site; designing the proposed Project such that any truck check-in point is inside the proposed Project site to ensure no trucks are queuing outside; design ing the proposed Project to ensure that truck traffic inside the proposed Project site is as far away as feasible from sensitive receptors; and restricting overnight truck parking in sensitive land uses by providing overnight truck parking inside the proposed Project site.
The proposed Project consists of a Specific Plan, which would facilitate the development of the 590.3-acre Project site as a mixed -use, master -planned community. Since the Project is a programmatic level document, specific site plans are not yet available.
As shown on pages 4.3 -35 through 4.3 -38 of the Draft EIR, Mitigation Measure AIR -2 requires that prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the emission reduction measures, including the following measures:
• All Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, construction equipment, and generators). • Project Applicants for manufacturing and light industrial uses with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with CARB Rule 2845 (13 California Code of Regulations [CCR] Chapter 10, Section 2485).
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 78
Menifee Mayor and City Council
February 7, 2024
Page
464 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-30 As such, the measures recommended in this comment are consistent with measures that have already been included as part of Mitigation Measure AIR-2.
In addition, as discussed on page 4.3 -43 of the Draft EIR, general light industrial, manufacturing, warehouse/storage, fulfillment center, and e -commerce operations are permitted except within distances specified in Specific Plan Section 4.0 to residential uses and Heritage High School. Section
4.0 of the Specific Plan specifies that no truck court accommodating diesel -fueled trucks or equipment shall operate within 250 feet of a residential property line or within 100 feet of a school property line, measured from the edge of pavement where a diesel truck or equipment could park or operate to the residential or school property line. In addition, as discussed on page 4.3 -43, trucks would travel on regional transportation routes throughout the Air Basin, contributing to near - roadway DPM concentrations. Page 4.3-43 also states that land use projects are required to comply with Assembly Bill 2588, SCAQMD Rule 1401, and CARB standards for diesel engines.
Further, an operational HRA was conducted to characterize the Project-related emissions of toxic air contaminants, including truck trips based on the Project’s trip generation estimates. As shown in Table 4.3.Q of the Draft EIR, with implementation of Mitigation Measure AIR -3, which requires Project Applicants/Developers to provide plans that indicate a heating, ventilation, and air conditioning (HVAC) system with a control efficiency sufficient to result in a reduction of a minimum 89 percent of particulates of 10 microns or less, such as Minimum Efficiency Reporting Value (MERV) 13 filters or greater, health risks at the nearest proposed and existing sensitive receptors would be below SCAQMD thresholds. Therefore, further mitigation to reduce potential health risks would not be required.
Response to Comment R-5-10
This comment states that many strategies are available to reduce exposures, including, but not limited to, building filtration systems with MERV 13 or better, or in some cases, MERV 15 or better is recommended; building design, orientation, location; vegetation barriers or landscaping screening, etc. This comment also states that because the filters would not have any effectiveness unless the HVAC system is running, there may be increased energy consumption that should be evaluated in the Final EIR. This comment states that it is typically assumed that the filters operate 100 percent of the time while residents are indoors, and the environmental analysis does not generally account for the times when the residents have their windows or doors open or are in common space areas of the Project site. In addition, this comment asserts that these filters have no ability to filter out any toxic gases and that when used filters are replaced, replacement has the potential to result in emissions from the transportation of used filters at disposal sites and generate solid waste that should be evaluated in the Final EIR. Therefore, the comment states that the presumed effectiveness and feasibility of any filtration units should be carefully evaluated in more detail prior to assuming that they will sufficiently alleviate exposures to diesel particulate matter emissions.
The proposed Project consists of a Specific Plan, which would facilitate the development of the 590.3-acre Project site as a mixed -use, master -planned community. Since the Project is a programmatic level document, specific Project -level information, such as energy usage and solid waste generation, is not yet known. Therefore, as discussed on page 4.3 -30 of the Draft EIR, when Project-specific data were not available, default assumptions (e.g., energy usage, water usage, and Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 79
Menifee Mayor and City Council
February 7, 2024
Page
465 of 1677
2-31
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) solid waste generation) from CalEEMod were used to estimate Project emissions. As described in the CalEEMod User ’s Guide, CalEEMod utilizes widely accepted methodologies for estimating emissions combined with default data that can be used when site -specific information is not available.1,2 As such, since Project -specific energy usage and solid waste generation is not yet known, the use of CalEEMod defaults is appropriate for use and is consistent with standard practice.
Additionally, as required by Mitigation Measure AIR -3, prior to issuance of building permits, Project Applicants/Developers shall provide plans that indicate a n HVAC system with a control efficiency sufficient to result in a reduction of a minimum 89 percent of particulates of 10 microns or less, such as MERV 13 filters or greater, for indoor air filtration systems. The ventilation system shall be certified to achieve the stated performance effectiveness from indoor areas. Therefore, the effectiveness of the filtration units will be certified and documented and no revisions to the Draft EIR are required.
Response to Comment R-5-11
This comment states that if implementation of the proposed Project would require the use of new stationary and portable sources, including but not limited to emergency generators, fire water pumps, boilers, spray booths, etc., air permits from SCAQMD will be required. This comment also states that the Final EIR should include a discussion about any new stationary and portable equipment requiring SCAQMD air permits and identify SCAQMD as a Responsible Agency for the proposed Project.
The proposed Project consists of a Specific Plan, which would facilitate the development of the 590.3-acre Project site as a mixed -use, master -planned community. Since the Project is a programmatic level document, specific Project plans are not yet available. Therefore, the use of equipment (e.g., emergency generators, fire water pumps, boilers, and spray booths) has not been identified for the proposed Project. Should future projects propose such equipment, they would be evaluated to determine whether additional CEQA evaluation is required to evaluate air toxic emissions and health impacts from these equipment types. In addition, as discussed on page 4.3 -35 of the Draft EIR, Mitigation Measure AIR -2 requires that prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with emission reduction measures, including that all Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, construction equipment, and generators). In addition, compliance with all applicable SCAQMD rules and permitting requirements would be necessary to limit potential impacts.
1 California Air Pollution Control Officers Association. 2021. California Emissions Estimator Model User’s Guide. May. Website: http://www.aqmd.gov/docs/default-source/caleemod/user-guide-2021/01_user-39- s-guide2020-4-0.pdf?sfvrsn=6 (accessed December 2023).
2 Detailed information regarding CalEEMod default assumptions can be found in the User’s Guide:
http://www.aqmd.gov/caleemod/user's-guide (accessed December 2023).
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 80
Menifee Mayor and City Council
February 7, 2024
Page
466 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-32 Response to Comment R-5-12
This comment states that the Final EIR should also include calculations and analyses for construction and operation emissions for the new stationary and portable sources, as this information will also be relied upon as the basis for the permit conditions and emission limits for the air permit(s).
Refer to Response to Comment R -5-11 above. Since the Project is a programmatic level document, specific Project plans are not yet available. Therefore, the use of stationary and portable sources has not been identified for the proposed Project. Should future projects propose such equipment, they would be evaluated to determine whether additional CEQA evaluation is required to evaluate air toxic emissions and health impacts from these equipment types. In addition, as discussed on page
4.3-35 of the Draft EIR, Mitigation Measure AIR -2 requires that prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with emission reduction measures, including that all Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, construction equipment, and generators). In addition, compliance with all applicable SCAQMD rules and permitting requirements would be necessary to limit potential impacts.
Response to Comment R-5-13
This comment requests responses to the comments provided in the letter pursuant to CEQA. The comment also provides conclusionary remarks and contact information for the SCAQMD CEQA IGR Program Supervisor.
The City acknowledges this comment and has prepared responses to the comments contained in the letter. No further response is necessary.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 81
Menifee Mayor and City Council
February 7, 2024
Page
467 of 1677
2-33
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.2 LOCAL AGENCIES
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 82
Menifee Mayor and City Council
February 7, 2024
Page
468 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-34 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 83
Menifee Mayor and City Council
February 7, 2024
Page
469 of 1677
December 4, 2023
Ryan Fowler
Principal Planner
City of Menifee
Community Development Department
29844 Haun Road
Menifee, CA 92586
SUBJECT: CITY OF PERRIS COMMENTS ON MENIFEE VALLEY SPECIFIC PLAN DRAFT EIR - GENERAL PLAN AMENDMENT (PLN 21 -0336), SPECIFIC PLAN (PLN 21 -0217), SPECIFIC PLAN AMENDMENT (PLN 21 -0221), CHANGE OF ZONE (PLN 21-0335), TENTATIVE PARCEL MAP (PLN 22-0033), AND DEVELOPMENT AGREEMENT (PLN 21-0338).
Dear Mr. Fowler:
The City of Perris appreciates the opportunity to comment on the “ Menifee Valley Specific Plan ” (“Proposed Project”) proposal to replace the existing SP 301 with the new Menifee Valley Specific Plan, generally located south of Highway 74, east of Menifee Road, w est of Briggs Road, and north of Matthews Road, within the City of Menifee, approximately 1 ½ miles east of the City of Perris city limits. This project includes 186.9 acres for residential development, 15.5 acres for a school, 29.8 acres for open space, 14.7 acres for conservation, 42.6 acres for commercial development, and 215 acres for industrial development.
The City of Perris supports regional development that helps to advance the quality of life in the Inland Empire, such as the proposed P roject. However, the City has the following comments related to the substantial traffic that would be generated in the future by passenger vehicles and semi-trucks:
Traffic Impact Analysis
1. The traffic study included only 10 potential cumulative projects located in the City of Perris. A copy of the assumed Perris cumulative projects is included in the attached Appendix A and identified as Table 4 – D Cumulative Projects – City of Perris. Based upon our review of numerous other projects in the City of Perris, there appear to be several projects missing from the Perris Cumulative Project list. RK would recommend that the Perris Planning Department review this list with respect to the study area and provide any additional approved projects that should be included in the Perris cumulative project list.
DEVELOPMENT SERVICES DEPARTMENT
PLANNING DIVISION
135 N. “D” Street, Perris, CA 92570-2200
TEL: (951) 943-5003 FAX: (951) 943-8379
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 84
Menifee Mayor and City Council
February 7, 2024
Page
470 of 1677
2. The traffic study analyzed intersections where the project had the potential for contributing 50 or more a.m./p.m. peak hour trips. RK reviewed the project assignment of traffic in the vicinity of the City of Perris and generally the intersections selected for review were consistent with this criterion. However, based upon the traffic assignment of the project in the City of Perris, there are two (2) additional intersections that should be studied where the project would contribute 50 or more a.m./p.m. peak hour trips. These include the following:
a. Mapes Road at Bonnie Drive/Perris Metro Station intersection b. Mapes Road at Case Road intersection
It appears that for these two additional intersections the project contributes more than 50 project peak hour trips, therefore, these two additional intersections should be analyzed similar to other intersections in the study area.
Additional intersections along Case Road (i.e. Murrieta Road, Goetz Road, G Street, Perris Boulevard, etc.) may also generate 50 or more peak hour project trips depending on how the volumes are assigned northeast of Mapes Road.
3. The traffic study identified 17 intersections in the City of Perris that would operate at an unacceptable level of service with the project and would require improvements. A summary of these intersections is included in Appendix B (Table 8–K – Intersection Improvement Funding Mechanisms and Fair Share) and is also shown on Exhibit B. The study indicated what improvements are needed at those intersections and a project fair share cost percentage.
However, it is unclear how these improvements would be impleme nted and who would be responsible for providing the required improvements. Additional detail is needed on the funding mechanisms that will be utilized to him make these required improvements.
4. The traffic study identified 13- Roadway Segments in or near the C ity of Perris that would require improvements. A summary of these is included in Appendix C (Table 8 – L – Roadway Segment Improvements Funding Mechanism and Fair Share). These locations are also shown on Exhibit B. Again, the improvements and project fair share percentage is included in Table 8 – L, however, no funding mechanism for implementing these required improve ments is identified in the report.
5. City of Perris Truck Routes. The traffic study identified the City of Perris Truck Routes on page 82 of the PDF – Figure 3 – 18. This figure is outdated and has been previously replaced with the truck route plan included in the attached Appendix D (City of Perris Truck Routes). It does appear from the traffic study that none of the project’s trucks have been routed to any of the City of Perris non- truck route roadways, based upon the assignment of project trips.
Therefore, this comment is meant for clarific ation and does not appear to have a significant impact to the conclusions of the study. It is recommended that the traffic consultant verify that the assignment of project trucks to ensure that do not utilize any of the truck routes restrictions included in Appendix D.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 85
Menifee Mayor and City Council
February 7, 2024
Page
471 of 1677
6. VMT Analysis. The traffic consultant prepared a detailed VMT analysis for the proposed project. This included a VMT assessment of VMT/service population of the project and in terms of the roadway VMT assigned to study area roadway segments. The study included some Project Design Features and VMT Mitigation Measures to help reduce the VMT per service population, because of the project. However, the results of the study indicate that these would not be sufficient to reduce the VMT per service population to an acceptable standard, based upon the City of Menifee criteria.
7. As a result of this finding, the VMT analysis concluded that the City would have to determine a Finding of Overriding Considerations to meet its CEQA requirements. Additional VMT mitigation measures that could be implemented should be explored to further reduce the VMT generated by the project. This would also have a benefit in terms of reducing external trips throughout the study area including the City of Perris. Perhaps consideration to additional CAPCOA VMT reduction measures can be considered to reduce VMT generated by the project and hence also reduce external trips to the City of Perris. A complete list of potential CAPCOA VMT reduction measures is included in Appendix E.
8. Prior to further proceedings, to ensure consistency, the right -of-way widths and alignments of Ethanac Road and Murrieta Road shall be coordinated with the roadway designation as classified per City of Perris’ General Plan. The correlation will determine the extent of roadway and intersection improvements at the intersection of Murrieta Road and Ethanac Road to accommodate the traffic impacts related to the project’s passenger vehicle trips. The Traffic Impact Analysis (TIA) should include an analysis of the intersection of Ethanac Road and Murrieta Road. Listed below are City of Perris’ roadway designations for Ethanac Road and Murrieta Road.
- Ethanac Road is classified as an Expressway (184ʹ/134ʹ) with a 14 foot wide raised landscaped median.
- Murrieta Road is classified as a Secondary Arterial (94ʹ/70ʹ) with a 14 foot wide raised landscaped median.
CEQA. Please provide future notices prepared for this Project pursuant to the California Environmental Quality Act (“CEQA” ) under any provision of Title 7 of the California Government Code governing California Planning and Zoning Law which includes: notices of any public hearing held pursuant to CEQA, and notices of any scoping meeting held pursuant to Public Resources Code Section 21083.9.
The City of Perris thanks you for considering these comments. Please feel free to contact me at (951) 943-5003, ext. 355, or [email protected] if you have any questions or would like to discuss the above comments in further detail.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 86
Menifee Mayor and City Council
February 7, 2024
Page
472 of 1677
Sincerely,
Patricia Brenes
Planning Manager
cc: Clara Miramontes, City Manager
Wendell Bugtai, Assistant City Manager
Robert Khuu, City Attorney
Kenneth Phung, Director of Development Services
John Pourkazemi, City Engineer
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 87
Menifee Mayor and City Council
February 7, 2024
Page
473 of 1677
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 88
Menifee Mayor and City Council
February 7, 2024
Page
474 of 1677
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 89
Menifee Mayor and City Council
February 7, 2024
Page
475 of 1677
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 90
Menifee Mayor and City Council
February 7, 2024
Page
476 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-42
2.2.1 City of Perris
Comment Code: L-1
Date: December 4, 2023
Response to Comment L-1-1
This comment is introductory and provides a brief description of the proposed Project including Project location and proposed uses.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment L-1-2
This comment expresses support for regional development that advances the quality of life in the Inland Empire, such as the proposed Project. The comment also introduces the City’s concerns related to the traffic generated by the proposed Project, which are discussed in greater detail in the subsequent comments.
The City acknowledges this comment. The responses to specific traffic -related comments are provided in Response to Comment L-1-3 through Response to Comment L-1-9 below.
Response to Comment L-1-3
This comment states that the Traffic Impact Analysis (TIA) included only 10 potential cumulative projects located in the City of Perris, and that there appear to be several projects missing from the Perris Cumulative Project list.
During the preparation of the TIA, LSA contacted City of Perris staff in April 2022 for information regarding cumulative projects. On April 26, 2022, the City provided a list with five projects within the city. Additionally, the TIA also included and evaluated additional major projects in the city, specifically in the south Perris area as indicated on the City’s website.
It should be noted that, as described in detail in the volume development section of the TIA, the Riverside County Transportation Model (RIVCOM) has been used for development of Horizon Year (2045) traffic volumes for this project. RIVCOM is the accepted travel demand model within Riverside County and includes most future projects in the County, including projects within Perris.
As described in Section 4.2 of the TIA, Horizon Year traffic volumes were developed using forecast volumes obtained from RIVCOM and by applying the National Cooperative Highway Research Program (NCHRP) post -processing methodologies. Information concerning cumulative projects within the study area were obtained from the planning departments of the City of Menifee and the adjacent jurisdictions of the County of Riverside, City of Lake Elsinore, City of Perris, City of Canyon Lake, City of Hemet, and City of S an Jacinto between May and September 2022. As such, the future year scenario in RIVCOM does not include all the cumulative projects provided by these jurisdictions because there is no certainty regarding the completion timeline for several of these projects. As a conservative approach, RIVCOM Year 2045 socioeconomic data were evaluated to determine Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 91
Menifee Mayor and City Council
February 7, 2024
Page
477 of 1677
2-43
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) whether these projects were included in the model. In cases where it was determined that the respective project was not included, the respective project was manually added into the model for generating Horizon Year (2045) traffic volumes. As such, the updated model includes all cumulative projects as provided by the City of Menifee and adjacent jurisdictions to be built by Horizon Year (2045) conditions.
Response to Comment L-1-4
This comment suggests that two (2) additional intersections that should be studied where the Project would contribute 50 or more a.m./p.m. peak -hour trips. These include Mapes Road at Bonnie Drive/Perris Metro Station, and Mapes Road at Case Road intersection. The comment further states that additional intersections along Case Road (i.e., Murrieta Road, Goetz Road, G Street, Perris Boulevard) may also generate 50 or more peak-hour Project trips depending on how the volumes are assigned northeast of Mapes Road.
LSA prepared a TIA scoping letter for the Project in July 2022 that included the study area to be analyzed for the Project. The consultant submitted the scoping letter to the City of Perris staff as well as other neighboring jurisdictions in July 2022 for confirmation on the study area, analysis methodology, or other comments. However, the City did not receive any comments on the study area from the City of Perris during that process and proceeded with the study area as included in the TIA scoping letter. As such, the City does not need to include analysis of these intersections unless otherwise requested by adjacent jurisdictions during the scoping agreement process.
Response to Comment L-1-5
This comment states that the TIA identified 17 intersections in the City of Perris that would operate at an unacceptable level of service with the Project and would require improvements. The comment questions how these improvements would be implemented and who would be responsible for providing the required improvements. Additional detail is requested on the funding mechanisms that will be utilized to make these required improvements.
Comment noted. The Project will be responsible for paying the fair -share costs. As such, it is not expected that the Project would be required to build any of the improvements within the City of Perris but will pay its fair share for any improvements to be approved by Perris. The Project Applicant and City of Menifee staff will coordinate with City of Perris staff about implementation of identified improvements and payment of fair-share cost.
Response to Comment L-1-6
This comment states that the TIA identified 13 Roadway Segments in or near Perris that would require improvements and requests that the funding mechanism for implementing these required improvements be identified.
Comment noted. The Project will be responsible for paying the fair -share costs. As such, it is not expected that the Project would be required to build any of the improvements within the City of Perris but will pay its fair share for any improvements to be approved by Perris. The Project Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 92
Menifee Mayor and City Council
February 7, 2024
Page
478 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-44 Applicant and City of Menifee staff will coordinate with City of Perris staff about implementation of identified improvements and payment of fair-share cost.
Response to Comment L-1-7
This comments states that the TIA identified the City of Perris truck routes but that the figure is outdated and has been previously replaced. It does appear from the TIA that none of the Project's trucks have been routed to any of the City of Perris non -truck route roadways, based upon the assignment of Project trips. Therefore, this comment is meant for clarification and does not appear to have a significant impact to the conclusions of the study. The comment further recommends that the assignment of Project trucks is verified to ensure that they do not utilize any of the truck route restrictions.
This comment is noted. The TIA demonstrates that project truck traffic will not be using any non - truck routes within Menifee and Perris. The Project Applicant and City of Menifee staff will coordinate to develop a conditions of approval memorandum that includes the truck routes to be used by the Project’s truck traffic.
Response to Comment L-1-8
This comment acknowledges that the detailed vehicle miles traveled (VMT) analysis prepared for the project included a VMT assessment of VMT per service population of the project in terms of the roadway VMT assigned to study area roadway segments. The study included some Project Design Features and VMT Mitigation Measures to help reduce the VMT per service population. However, the results of the study indicate that these would not be sufficient to reduce the VMT per service population to an acceptable standard, based upon City of Menifee criteria.
The comment restates the conclusion that the City would have to determine a Finding of Overriding Considerations for VMT impacts to meet its CEQA requirements. The comment requests that additional VMT mitigation measures should be explored to further reduce the VMT generated by the project. This would also have a benefit in terms of reducing external trips throughout the study area, including Perris.
Comment noted. Since the Project is a programmatic level document, specific Project -level information, including building specifications, users, and specific VMT impacts associated with future implementing projects are not yet known. The Project Applicant and City of Menifee staff will coordinate to determine additional feasible VMT reduction measures that the Project could implement to reduce Project VMT as each phase of the Project is developed.
Response to Comment L-1-9
This comment requests that the right -of-way widths and alignments of Ethanac Road and Murrieta Road be coordinated with the roadway designation as classified per the City of Perris General Plan.
The comment further states that this will determine the extent of roadway and intersection improvements at the intersection of Murrieta Road and Ethanac Road to accommodate the traffic impacts related to the Project’s passenger vehicle trips. Further, the comment requests that the TIA include an analysis of the intersection of Ethanac Road and Murrieta Road. The comment provides Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 93
Menifee Mayor and City Council
February 7, 2024
Page
479 of 1677
2-45
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) the City of Perris’ roadway designations for Ethanac Road and Murrieta Road: (a) Ethanac Road is classified as an Expressway (184 ’/134’) with a 14 -foot-wide raised landscaped median; and (b) Murrieta Road is classified as a Secondary Arterial (94 ’/70’) with a 14 -foot-wide raised landscaped median.
LSA acknowledges this comment. This intersection has been analyzed in the TIA (Intersection 36). As shown in the TIA, the Project would have a cumulative deficiency at this intersection under project build-out conditions and Horizon Year conditions . Improvements were identified primarily to the south leg (which is under City of Menifee jurisdiction) that would address the operational deficiency identified at this intersection. A southbound through lane would also be required ; however, the widening of the south leg would only require restriping at the north leg to accommodate this improvement. The Project would be paying its fair share for implementation of these improvements as identified in Table 8 -K of the TIA. The City of Menifee and the City of Perris will coordinate to ensure consistency, right-of-way widths, and alignment of Ethanac Road and Murrieta Road per the General Plans of both cities during implementation of the proposed improvement.
Response to Comment L-1-10
This comment requests that all future notices prepared for the proposed Project pursuant to CEQA, including notices of any public hearings or scoping meetings, be provided to the City of Perris. This comment also provides concluding remarks and the contact information for the City of Perris Planning Manager.
The City acknowledges this comment and will provide all future notices prepared for the proposed Project pursuant to CEQA to the City of Perris.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 94
Menifee Mayor and City Council
February 7, 2024
Page
480 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-46 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 95
Menifee Mayor and City Council
February 7, 2024
Page
481 of 1677
2-47
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.3 ORGANIZATIONS
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 96
Menifee Mayor and City Council
February 7, 2024
Page
482 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-48 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 97
Menifee Mayor and City Council
February 7, 2024
Page
483 of 1677
6811-003j
ARIANA ABEDIFARD
KEVIN T. CARMICHAEL
CHRISTINA M. CARO
THOMAS A. ENSLOW
KELILAH D. FEDERMAN
RICHARD M. FRANCO
ANDREW J. GRAF
TANYA A. GULESSERIAN
DARION N. JOHNSTON
RACHAEL E. KOSS
AIDAN P. MARSHALL
TARA C. RENGIFO
Of Counsel
MARC D. JOSEPH
DANIEL L. CARDOZO
SACRAMENTO OFFICE
520 CAPITOL MALL, SUITE 350
SACRAMENTO, CA 95814 -4721
T E L : ( 9 1 6 ) 4 4 4 - 6 2 0 1
F A X : ( 9 1 6 ) 4 4 4 - 6 2 0 9
ADAMS BROADWELL JOSEPH & CARDOZO
A PROFESSIONAL CORPORATION
A T T O RN E Y S A T L A W
6 0 1 G A T E W A Y B O U L E V A R D , S U I T E 1 0 0 0 S O U T H S A N F R A N C I S C O , C A 9 4 0 8 0- 7 0 3 7 ___________
T E L : ( 6 5 0 ) 5 8 9- 1 6 6 0
F A X : ( 6 5 0 ) 5 8 9- 5 0 6 2
s s a n n a d a n@ a d a m s b r o a d w e l l . c o m
printed on recycled paper
October 20, 2023
Via U.S. Mail and Email
Cheryl Kitzerow, AICP
Community Development Director
Menifee City Hall
Community Development Department
29844 Haun Road
Menifee, CA 92586
Email: [email protected]
Sarah Manwaring, City Clerk
Menifee City Hall
City Clerk Department
29844 Haun Road
Menifee, CA 92586
Email: [email protected]
Via Email Only
Ryan Fowler, Principal Planner
Email: [email protected]
Re: Request for Immediate Access to Documents Referenced in the Draft Environmental Impact Report – Menifee Valley Specific Plan (SCH No. 2022030233)
Dear Ms. Kitzerow, Ms. Manwaring, and Mr. Fowler:
We are writing on behalf of Californians Allied for a Responsible Economy (“CARE CA”) to request immediate access to any and all documents referenced, incorporated by reference, and relied upon in the Draft Environmental Impact Report (“DEIR”) prepared for the Menifee Valley Specific Plan (SCH No. 2022030233) (“Project”), proposed by Minor Ranch, LLC. (“Applicant”). This request excludes a copy of the DEIR and its appendices. This request also excludes any documents that are currently available on the City of Menifee website.1
The Project proposes the construction of up to 1,718 single-family and multi- family residential homes, as well as residential neighborhood amenities that include but are not limited to: a private recreation center, greenbelts, a dog park, and an agriculture-themed business area that could include a community farm/produce stands, a garden/growing area, and small commercial and non-commercial animal-
1 Accessed https://www.cityofmenifee.us/325/Environmental-Notices-Documents on October 20, 2023.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 98
Menifee Mayor and City Council
February 7, 2024
Page
484 of 1677
October 20, 2023
6811-003j
printed on recycled paper
keeping; an elementary school; 120,000 square feet (SF) of public facilities to be developed by the City of Menifee; up to 4,360,000 SF of business park for light industrial, manufacturing, warehouse/storage, and e-commerce uses; up to 1,150,000 SF of commercial business park for commercial, retail, incubator, and small-scale light industrial uses; and up to 560,000 SF of commercial building space for commercial, retail, and incubator uses. The 590.3-acre Project site is bounded on the north by SR-74, on the south by Matthews Road, on the east by Briggs Road, and on the west by Menifee Road (Assessor’s Parcel Numbers:
331-260-005 through -009, 331-270-005, 331-280-005, 331-290-004, 331-300-002, 331-300-004, 331-300-005, 331-300-007, 331-300-013, 333-170-012, 333-170-006, 333-170-013, 333-170-011) in the City of Menifee, Riverside County, California.
Our request for immediate access to all documents referenced in the DEIR is made pursuant to the California Environmental Quality Act (“CEQA”), which requires that all documents referenced, incorporated by reference, and relied upon in an environmental review document be made available to the public for the entire comment period.2
Please use the following contact information for all correspondence:
U.S. Mail
Sheila M. Sannadan
Adams Broadwell Joseph & Cardozo
601 Gateway Boulevard, Suite 1000
South San Francisco, CA 94080-7037
Email
[email protected]
2 See Public Resources Code § 21092(b)(1) (stating that “all documents referenced in the draft environmental impact report” shall be made “available for review”); 14 Cal. Code Reg. § 15087(c)(5) (stating that all documents incorporated by reference in the EIR . . . shall be readily accessible to the public”); see also Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 442, as modified (Apr. 18, 2007) (EIR must transparently incorporate and describe the reference materials relied on in its analysis); Santiago County Water District v. County of Orange (1981) 118 Cal.App.3rd 818, 831 (“[W]hatever is required to be considered in an EIR must be in that formal report. . .”), internal citations omitted.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 99
Menifee Mayor and City Council
February 7, 2024
Page
485 of 1677
October 20, 2023
6811-003j
printed on recycled paper
If you have any questions, please call me at (650) 589-1660 or email me at [email protected]. Thank you for your assistance with this matter.
Sincerely,
Sheila M. Sannadan
Legal Assistant
SMS:ljl
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 100
Menifee Mayor and City Council
February 7, 2024
Page
486 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-52
2.3.1 Adams Broadwell Joseph & Cardozo
Comment Code: O-1
Date: October 20, 2023
Response to Comment O-1-1
This comment is introductory and states that Adams Broadwell Joseph & Cardozo is representing Californians Allied for a Responsible Economy (“CARE CA”) and requests immediate access to all documents referenced, incorporated by reference, and relied upon in the Draft EIR, excluding the Draft EIR itself, its appendices, and documents available on the City website.
The comment requested all documents referenced, incorporated by reference, and relied upon in the D raft EIR. However , CEQA only requires the City to provide the address where documents incorporated by reference in the D raft EIR can be reviewed. State CEQA Guidelines Section 21092(b)(1) includes public notice requirements for agencies preparing environmental impact reports or negative declarations. It provides, in relevant part “[t]he notice shall specify . . .the address where copies of the draft environmental impact report or negative declaration, and all documents referenced in the draft environmental impact report or negative declaration, are available for review….” (Pub. Res. Code, § 21092(b)(1).) State CEQA Guidelines Section 15087(c)(5) clarifies that the notice shall specify “[t]he address where copies of the EIR and all documents incorporated by reference in the EIR will be available for public review. This location shall be readily accessible to the public during the lead agency's normal working hours.” (14 Cal. Code Regs., § 15087(c)(5).) State CEQA Guidelines Section 15087(c)(5) was amended effective 2018 to clarify that the term “ referenced in the draft environmental report ” for the purposes of State CEQA Guidelines Section 21092 and State CEQA Guidelines Section 15087 means “ incorporated by reference ” as described in State CEQA Guidelines Section 15150. In its comments on the amendment, the Governor’s Office of Planning and Research observed that “if the requirement for the lead agency to make documents available for public inspection were to include all documents simply referenced or cited in an EIR or negative declaration, the requirement would be burdensome, unnecessary and unreasonable on lead agencies.” These authorities clarify that CEQA requires that the City provide notice of the address where all documents incorporated by reference in the D raft EIR are available for public inspection.
In addition to the Draft EIR and the appendices specifically excluded from the commentor’s request, there are five other documents referenced in Section 2.5 of the D raft EIR and incorporated by reference into the D raft EIR and available for inspection at the City. As required by State CEQA Guidelines Section 21092(b)(1) and State CEQA Guidelines Section 15087(c)(5), the City’s public notice specified that the Draft EIR and these documents are available for review at the Menifee City Hall, 29844 Haun Road, Menifee, CA 92586.
Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment O-1-2
This comment provides a summary of the proposed Project.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 101
Menifee Mayor and City Council
February 7, 2024
Page
487 of 1677
2-53
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment O-1-3
This comment states that the request for documents stated in Comment O -1-1 has been made pursuant to CEQA and explains the CEQA requirement that all documents referenced, incorporated by reference, and relied upon in an environmental review document are made publicly available for the full duration of the review period.
Please see Response O-1-1.
Response to Comment O-1-4
This comment provides concluding remarks and contact information.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 102
Menifee Mayor and City Council
February 7, 2024
Page
488 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-54 This page intentionally left blank
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 103
Menifee Mayor and City Council
February 7, 2024
Page
489 of 1677
03-057-2016-015
Dear Mr. Ryan Fowler,
The Agua Caliente Band of Cahuilla Indians (ACBCI) appreciates your efforts to include the Tribal Historic Preservation Office (THPO) in the SPA 2016-140 & TTM 2016-139 project. We have reviewed the documents and have the following comments:
[VIA EMAIL TO:[email protected]]
City of Menifee
Mr. Ryan Fowler
29714 Haun Road
Menifee, CA 92586
November 07, 2023
Re: Menifee Valley Specific Plan DEIR
Again, the Agua Caliente appreciates your interest in our cultural heritage. If you have questions or require additional information, please call me at (760) 423-3485. You may also email me at [email protected].
Cordially,
Xitlaly Madrigal
Cultural Resources Analyst
Tribal Historic Preservation Office
AGUA CALIENTE BAND
OF CAHUILLA INDIANS
# *Please provide the confidential Cultural Resources Assessments. # *The Draft Environmental Impact Report included standard mitigation measures to address impacts to cultural resources. We found these measures to be sufficient.
# *Please provide update as to where and when CA-RIV-12345 will be relocated.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 104
Menifee Mayor and City Council
February 7, 2024
Page
490 of 1677
From: Ryan Fowler
To: Ashley Davis; Lauren Peachey
Subject: FW: Menifee Valley Specific Plan DEIR
Date: Tuesday, November 7, 2023 1:52:38 PM
Attachments: Final Menifee Valley Cultural Letter_03032022.pdf 03-057-2016-015ACBCI11_7_2023.pdf
Just so you have record of my response. This letter should probably be included as Comment Letter #3. -----Original Message-----
From: Ryan Fowler
Sent: Tuesday, November 7, 2023 1:50 PM
To: THPO Consulting <[email protected]>
Subject: RE: Menifee Valley Specific Plan DEIR
Good afternoon, Xitlaly.
The Pechanga tribe has indicated preference for reburial of inadvertent finds within the Project's open space; they mentioned a preference for reburial at the nearby Granite Hill site located within the southeasterly corner of the Project site. This hill is a set-aside preservation area per the Specific Plan (shown in green in Figure 3 in the attached report). The Tribes will be consulted (per Measure RCM CUL-1 of the Draft EIR) to ensure that the reburial location is outside the boundaries of other known cultural resource sites.
Please feel free to reach out if you have any further questions.
RYAN FOWLER | Principal Planner
Community Development Department
"Creating a HEALTHY, VIBRANT, and CONNECTED community for everyone." City of Menifee | 29844 Haun Road | Menifee, CA 92586 City Hall: (951) 672-6777 | Direct: (951) 723-3740 | Fax:
(951) 679-3843 [email protected] | cityofmenifee.us Connect with us on social media: | | |
*Please note that email correspondence with the City of Menifee, along with attachments, may be subject to the California Public Records Act, and therefore may be subject to disclosure unless otherwise exempt. The City of Menifee shall not be responsible for any claims, losses or damages resulting from the use of digital data that may be contained in this email.
-----Original Message-----
From: THPO Consulting <[email protected]>
Sent: Tuesday, November 7, 2023 10:42 AM
To: Ryan Fowler <[email protected]>
Subject: Menifee Valley Specific Plan DEIR
[CAUTION]: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Good Morning,
If you have any questions about the attached letter please feel free to contact me.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 105
Menifee Mayor and City Council
February 7, 2024
Page
491 of 1677
Thank you,
Xitlaly Madrigal
Cultural Resources Analyst
[email protected]
C: (760) 423-3485 | D: (760) 883-6829
5401 Dinah Shore Drive, Palm Springs, CA 92264
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 106
Menifee Mayor and City Council
February 7, 2024
Page
492 of 1677
03-057-2018-004
Dear Mr. Ryan Fowler,
The Agua Caliente Band of Cahuilla Indians (ACBCI) appreciates your efforts to include the Tribal Historic Preservation Office (THPO) in the SPA No. 2018-182, SP No. 2018-181, TR 2018-209 project. We have reviewed the documents and have the following comments:
[VIA EMAIL TO:[email protected]]
City of Menifee
Mr. Ryan Fowler
29714 Haun Road
Menifee, CA 92586
December 07, 2023
Re: Menifee Valley Specific Plan Reburial Location
Again, the Agua Caliente appreciates your interest in our cultural heritage. If you have questions or require additional information, please call me at (760) 423-3485. You may also email me at [email protected].
Cordially,
Xitlaly Madrigal
Cultural Resources Analyst
Tribal Historic Preservation Office
AGUA CALIENTE BAND
OF CAHUILLA INDIANS
# *To our knowledge there are no known TCRs in the proposed reburial location.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 107
Menifee Mayor and City Council
February 7, 2024
Page
493 of 1677
2-59
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
2.3.2 Agua Caliente Band of Cahuilla Indians (Agua Caliente Band) Comment Code: O-2
Date: November 7, 2023
Response to Comment O-2-1
This comment provides introductory remarks.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Response to Comment O-2-2
This comment requests access to the Confidential Cultural Resources Assessments prepared for the proposed Project.
The confidential attachment to the Updated Cultural Resource Study for the Menifee Valley Specific Plan Project (Study), which was removed prior to public distribution of the Study as Appendix E -1 to the Draft EIR, was provided to the Agua Caliente Band on November 7, 2023 (included as Comment O-2-6). The City looks forward to continuing its communication with the Agua Caliente Band regarding the proposed Project.
Response to Comment O-2-3
This comment states that the Agua Caliente Band found the standard mitigation measures included in the Draft EIR pertaining to cultural resources to be sufficient.
The City acknowledges this comment.
Response to Comment O-2-4
This comment requests information regarding the relocation of Cultural Resource CA-RIV-12345.
This comment was addressed by the City in its correspondence to the Agua Caliente Band on November 7, 2023, which is included as Comment O-2-6. Please refer to Response to Comment O-2- 6 for information regarding the proposed relocation site. Regarding timing, as stated in MM TCR-2 in Section 4.18, Tribal Cultural Resources, of the Draft EIR, relocation and reburial would occur prior to the commencement of ground disturbance activities of the area encompassing CA-RIV-12345.
Response to Comment O-2-5
This comment provides concluding remarks and contact information.
The City acknowledges this comment. Given that the comment does not raise any specific issues regarding the Draft EIR or the analysis contained therein, no further response is necessary.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 108
Menifee Mayor and City Council
February 7, 2024
Page
494 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 2-60 Response to Comment O-2-6
In this comment, a representative of the City of Menifee provides an e-mail response to Comment O-2-4 from the Agua Caliente Band , providing information regarding the proposed reburial location of CA -RIV-12345 and other inadvertent finds within the Project site. The City indicates that the Tribes will be consulted to ensure that the reburial location is outside the boundaries of other known cultural resource sites.
This comment serves as a record of the City’s e-mail correspondence with the Agua Caliente Band in response to Comment O-2-4.
Response to Comment O-2-7
This comment provides a response from the Agua Caliente Band to the City’s e -mail response indicating that there are no known tribal cultural resources within the proposed reburial location of CA-RIV-12345 and other inadvertent finds within the Project site.
This comment serves as a record of the City’s e-mail correspondence with the Agua Caliente Band in response to Comment O-2-4.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 109
Menifee Mayor and City Council
February 7, 2024
Page
495 of 1677
3-1
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
3.0 ERRATA
This section of the Final EIR provides text changes to the Draft EIR that have been made to clarify, amplify, or make minor edits to the Draft EIR text for the proposed Menifee Valley Specific Plan (proposed Project). Such changes are a result of further review of, and public comments related to, the Draft EIR. The changes described in this section are minor changes that do not constitute significant new information, change the conclusions of the environmental analysis, or require recirculation of the document (State California Environmental Quality Act [CEQA] Guidelines Section 15088.5).
Such changes to the Draft EIR are indicated in this section under the appropriate Draft EIR section.
Deletions are shown with strikethrough and additions are shown with underline.
3.1 DRAFT EIR - GLOBAL REVISION
According to the Subdivision Map Act, if the parcels on a proposed subdivision are larger than 20 (gross) acres , the subdivision map would be classified as a Tentative Parcel Map. If parcels on a proposed subdivision are less than 20 gross acres, it would be classified as a Tentative Tract Map. As some of the parcels within the proposed subdivision are less than 20 gross acres, the subdivision map for the proposed Project would be classified as a Tentative Tract Map.
As such, every mention of “Tentative Parcel Map” in the Draft EIR should be referenced as “Tentative Tract Map”. Tentative Tract Map No. PLN 22-0033 is a Finance Map, and this terminology revision is a function of how the map is referenced and has no bearing on the processing of the subdivision map in the case or on the associated environmental impacts . Further, the process and requirements dictated by the City’s Engineering and Public Works Department are the same for both a Parcel Map and a Tract Map . This change was made for clarification only and has no effect on the analysis or conclusions contained in the Draft EIR.
3.2 CHAPTER 3.0, PROJECT DESCRIPTION
Chapter 3.0, Project Description, has been revised in response to a comment letter received during public circulation of the Draft EIR from the Riverside County Flood Control and Water Conservation District (comment letter R-4). This change was made for clarification only and has no effect on the analysis or conclusions contained in the Draft EIR.
The following revision was made to Table 3.B: Probable Future Actions by Responsible/Trustee Agencies in Section 3.9.4, Probable Future Actions by Responsible/Truste e Agencies (see boldly outlined cells on the following table):
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 110
Menifee Mayor and City Council
February 7, 2024
Page
496 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 3-2 Table 3.B: Probable Future Actions by Responsible/Trustee Agencies Responsible/Trustee Agency Action
State Water Resources Control Board
(SWRCB)
Applicant/Developer must submit Permit Registration Documents, including a Notice of Intent, to comply with the National Pollutant Discharge Elimination System (NPDES) Riverside County Municipal Permit (Order No. R8-2010-0033).
California Department of Fish and
Wildlife (CDFW)
Approval of Section 1602 Permit
South Coast Air Quality Management
District
Permits to Construct and Permits to Operate (should any business park uses require such permits)
Riverside County Transportation
Commission (RCTC)
Approval of non-vehicular bridge crossing over the BNSF RR.
Regional Water Quality Control Board
(RWQCB)
Section 401 Water Quality Certification and Issuance of Waste Discharge Requirements (WDRs).
United States Army Corps of Engineers
(ACOE)
Approval of Section 404 Permit and an HMMP.
Division of the State Architect Approval of construction plans and grading permit for a proposed school.
Riverside County Airport Land Use
Commission
Approvals of Consistency with the March Air Reserve Base Airport Land Use Compatibility Plan.
Caltrans Approval of improvement plans for SR-74 and Encroachment Permits into State right-of-way.
Southern California Edison (SCE) Approval for undergrounding of utility lines and Encroachment Permits.
Federal Emergency Management
Agency
Approval of a Conditional Letter of Map Revision (CLOMR) and Letter of Map Revision (LOMR) to remove portions of the Project site from the 100-year floodplain.
Riverside County Flood Control and
Water Conservation District (District)
Issuance of an encroachment permit for construction activities involving Romoland Master Drainage Plan Line A.
Source: Compiled by LSA Associates, Inc. (202 32).
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 111
Menifee Mayor and City Council
February 7, 2024
Page
497 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 1
1.0 INTRODUCTION
1.1 Findings of Fact
The California Environmental Quality Act (CEQA) requires that the environmental impacts of a project be examined and disclosed prior to approval of a project. Pursuant to CEQA Guidelines Section 15091(a), No public agency shall approve or carry out a project for which an EIR has been certified which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding. The possible findings are:
1) Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the final EIR [referred to in these Findings as “Finding 1”].
2) Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency [referred to in these Findings as “Finding 2”]. 3) Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the final EIR [referred to in these Findings as “Finding 3”].
Having received, reviewed and considered the Final Menifee Valley Specific Plan Project (Project), State Clearinghouse (SCH) #2022030233; as well as all other information in the record of proceedings on this matter, the following Findings Regarding the CEQA Documents for the Project are hereby adopted by the City of Menifee (City).
1.2 Document Format
These Findings have been categorized into the following sections:
1) Section 1.0 provides an introduction to these Findings. 2) Section 2.0 provides a summary of the Project, overview of other discretionary actions required for the Project, and a statement of Project objectives.
3) Section 3.0 provides a summary of those activities that have preceded the consideration of the Findings for the Project as part of the environmental review process, and a summary of public participation in the environmental review for the Project. 4) Section 4.0 sets forth findings regarding those potentially significant environmental impacts identified in the CEQA Documents which the City has determined to be less than significant with the implementation of Project design features.
5) Section 5.0 sets forth findings regarding those significant or potentially significant environmental impacts identified in the CEQA Documents which the City has determined can feasibly be mitigated Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 112
Menifee Mayor and City Council
February 7, 2024
Page
498 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 2
to a less than significant level through the imposition of mitigation measures included in the MMRP for the Project.
6) Section 6.0 sets forth findings for significant and unavoidable project impacts. 7) Section 7.0 sets forth findings regarding growth-inducing impacts. 8) Section 8.0 sets forth findings regarding alternatives to the Project. 9) Section 9.0 contains findings regarding the Mitigation, Monitoring and Reporting Program (MMRP) for the Project.
10) Section 10.0 contains other relevant findings adopted by the City with respect to the Project. 11) Section 11.0 contains the Statement of Overriding Considerations for the Project. 12) Section 12.0 contains information pertaining to the certification of the Final EIR.
The Findings set forth in each section herein are supported by findings and facts identified in the administrative record of the Project.
1.3 Custodian and Location of Records
The documents and other materials that constitute the administrative record for the City’s actions regarding the Project are located at the City of Menifee Community Development Department, 29844 Haun Road, Menifee, California 92586. The City is the custodian of the administrative record for the Project.
2.0 PROJECT SUMMARY
2.1 Project Description/Location
The Project site is located within the Menifee Valley Ranch Specific Plan No. 301 (SP 301) in the northeastern portion of the City of Menifee in Riverside County, California. Regional access to the Project site is provided by State Route 74 (SR-74), which is located adjacent to a majority of the northern boundary of the Project site, and Interstate 215 (I-215), which is located approximately 2 miles (mi) west of the Project site. The 590.3-acre (ac) Project site is comprised of Assessor’s Parcel Numbers [APN] 331-260-005, 331-260-006, 331-260-007, 331-260-008, 331-260-009, 331-270-005, 331-280-005, 331-290-004, 331-300-002, 331-300-004, 331-300-005, 331-300-007, 331-300-013, 333-170-012, 333-170-006, 333-170-013, and 333-170-011. The 590.3-acre site is a portion of the approved SP 301 which covers a total of 942.0 acres.
The Project site is currently undeveloped vacant land under the jurisdiction of the City and is generally a flat to gently sloping property with the exception of a granitic hill on the southeastern corner of the Project site. The property is currently leased to an agricultural operator that farms the majority of the site.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 113
Menifee Mayor and City Council
February 7, 2024
Page
499 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 3
The Project proposes a mixed-use development located within the approved Menifee Valley Ranch Specific Plan (SP 301) and two sets of off-site improvement areas. The Project would separate the 590.3 acres north of Matthews Road and the existing rail line, from the approved SP 301 property to the south to create the new Menifee Valley Specific Plan.
The first set of off-site improvements includes roadway improvements to existing roadways (e.g., Menifee Road, State Route 74 [SR-74], and Briggs Road), utility connections (e.g., water, sewer, stormwater, electricity, internet, and natural gas), landscaping, and construction of a non-vehicular bridge to connect the Specific Plan site to the Heritage Lake community to the south.
The second set of off-site roadway improvements are proposed to address traffic impacts in conflict with the General Plan policies as identified in the Circulation Element. These roadway improvements, which include widening and additional turn lanes as required, include the following: extend McLaughlin Road as a 2-lane modified arterial west of the Project and connect it to Case Road- Matthews Road; widen Case Road-Matthews Road to a 2-lane modified arterial; and enforce diversion of southbound Project truck traffic to the Ethanac Road interchange using the McLaughlin Road extension to Matthews Road/Case Road. These improvements would result in these roadway segments being built out to their ultimate configurations as identified in the City’s General Plan Circulation Element (Circulation Element Exhibit C-3).
The Project’s Land Use Plan would divide the property into 14 “Planning Areas” to accommodate 1,718 residential units; 44.5 acres of open space; 6,190,000 sf of business park, commercial business park, commercial areas and civic uses; and 32.4 acres of infrastructure and interior roads.
The Project includes a General Plan Amendment (GPA No. PLN 21-0336), Change of Zone (CZ No. PLN 21-0335), Specific Plan Amendment (No. PLN 21-0221), Specific Plan (No. PLN 21-0217), Tentative Tract Map (No. PLN 22-0033), and Development Agreement (No. PLN 21-0338). The GPA proposes an Amendment to the City’s General Plan to revise the General Plan land use map to include the proposed Menifee Valley Specific Plan designation and remove the portion of SP 301 from the Project area. The CZ proposes revisions to the zoning ordinance text of SP 301 to reflect the proposed Specific Plan Amendment and to revise the City’s Zoning Map to include the proposed Project’s zone and reflect the proposed Specific Plan Amendment. The Specific Plan Amendment proposes the fourth amendment to SP 301, which would remove parcels located north of Matthews Road from SP 301, thereby reducing the size of SP 301 from 1,548.3 acres to 942.0 acres.
2.2 Discretionary Actions
The City is the Lead Agency under CEQA and is responsible for reviewing and certifying the adequacy of the EIR for the Project. It is expected that the City, at a minimum, would consider the data and analyses contained in this EIR when making their permit determinations. Prior to development of the Project, discretionary permits and approvals must be obtained from local, state and federal agencies, as listed below.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 114
Menifee Mayor and City Council
February 7, 2024
Page
500 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 4
•EIR Certification: This Draft EIR is being prepared as the California Environmental Quality Act (CEQA) compliance document for the entitlement (approval) of the Specific Plan, and associated approvals discussed below. The EIR discusses consistency between this Specific Plan and the City of Menifee General Plan 2030 and provides mitigation measures to avoid or reduce the environmental effects resulting from the Specific Plan’s implementation. •General Plan Amendment (GPA No. PLN 21-0336): The General Plan Amendment (GPA) would revise the General Plan land use map to include the Menifee Valley Specific Plan land use designation and remove the portion of Specific Plan No. 301 (SP 301) proposed to be removed under Specific Plan Amendment No. PLN 21-0221 (as described below). •Change of Zone (CZ No. PLN 21-0335): A change of zone is required to revise the City Zoning Map to include the Menifee Valley Specific Plan (Specific Plan No. PLN 21-0217) zone. The change of zone is required to change the SP 301 zoning designation to Specific Plan No. PLN 21-0217. •Specific Plan Amendment (SPA No. PLN 21-0221): The Specific Plan Amendment (SPA) would remove parcels located north of Matthews Road, south of Highway 74, east of Menifee Road, and west of Briggs Road from SP 301. The removal of this area from SP 301 would reduce the size of SP 301 from 1,548.3 to 942.0 acres and would reduce the number of permitted residential units within SP 301 by 1,718 units.
•Specific Plan (No. PLN 21-0217): The approval of the Specific Plan would create the Menifee Valley Specific Plan (MVSP) on 590.3 acres. Project-related improvements and proposed land uses are discussed in this chapter of the EIR (Chapter 3.0).
•Tentative Tract Map (No. PLN 22-0033) (TTM No. 38303): The Tentative Tract Map includes an 11-lot subdivision to establish the boundaries and dimension of streets and the proposed mass grading for the MVSP. Following map recordation, the final map would become the legal document that identifies the lots and backbone infrastructure to allow for future subdivision maps to be filed.
•Development Agreement (No PLN 21-0338): The Development Agreement (DA) between the Applicant and the City identifies the terms for development of the Project site and identifies the Applicant’s obligations associated with the proposed Project. The DA refers to the MVSP for the allowable land uses in the Specific Plan area and outlines other terms and conditions of approval associated with the Specific Plan’s approval and implementation.
2.3 Statement of Objectives
The following objectives have been established for the Project by the City and Project applicant:
•Implement the City of Menifee’s General Plan, which envisions that the geographic area governed by the MVSP will be developed into a high-quality master planned community that demonstrates consistency with the City’s General Plan policies.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 115
Menifee Mayor and City Council
February 7, 2024
Page
501 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 5
•Plan for the development of a contemporary mixed-use community that internally balances housing needs and community amenities with job-producing commercial and business park uses that are economically viable in a 21st century economy. •Locate businesses such as large warehouses and other uses that support the supply chain and which rely on transportation efficiency in a location with direct access to Menifee Road and Highway 74, which are established truck routes.
•Ensure that the addition of business park and commercial business park areas to the Specific Plan are designed as places where businesses can prosper, attract economic investment to the City of Menifee, and provide goods, services, and job opportunities to the surrounding community and region.
•Concentrate residential uses along Briggs Road and provide opportunities in the residential areas for supportive uses that are important to households such as an elementary school, agri- commercial uses such as a community farm, green spaces, and recreational amenities. •Physically separate residential and business park areas through traditional and creative means such that the uses are complementary and supportive while limiting real and perceived conflicts associated with the adjacency of these uses.
•Provide for a public sports park with athletic fields, swim center, and other features that will be available for public use.
•Create gathering spaces and encourage outdoor movement in the form of parks, paseos, streetside green spaces, and outdoor employee amenity areas. •Position a public facility/civic node in a convenient location that provides opportunity for a new fire station, a potential new rail corridor transit stop, or other public or quasi-public uses. •Preserve Granite Hill in permanent open space, while allowing trails and other non-invasive activities that will protect the tangible and intangible assets of the landform. No development is permitted within Planning Area 7B, except as necessary for the construction of Briggs Road. •Provide a comprehensive circulation network with integrated mobility options by introducing traffic calming features in the residential areas, by providing pedestrian and bicycle paths and amenities throughout the community, and by providing a non-vehicular bridge connection to the Heritage Lake community to the south.
•Identify and implement infrastructure improvements to provide adequate and reliable water, reclaimed water, sewer, and storm drain service for the community. •Create a cohesive architectural and landscape theme that ties the various components of the community together to appear as a unified, defined and recognizable place.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 116
Menifee Mayor and City Council
February 7, 2024
Page
502 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 6
3.0 ENVIRONMENTAL REVIEW AND PUBLIC PARTICIPATION
A Notice of Preparation (NOP) was distributed for the Project by the City to the State Clearinghouse on March 22, 2022. The State of California Clearinghouse issued a project number for the project, SCH #2022030233. In accordance with CEQA Guidelines Section 15082, the NOP was circulated to interested agencies, groups, and individuals for a period of 30 days, from March 10 to April 8, 2022, during which comments were solicited and received, pertaining to environmental issues/topics that the Draft EIR should evaluate. These NOP responses were considered in the preparation of the Draft EIR, which upon release, was made available to all Responsible/Trustee Agencies and interested groups and individuals, as required under CEQA Guidelines Sections 15105 and 15087. A public scoping meeting was held on March 29, 2022, at 5:30 pm, in the City of Menifee City Hall.
The State-mandated public review of the Draft EIR began on October 19, 2023 and concluded on December 4, 2023. The Final EIR includes a Response to Comments package, which presents all written comments received during the public review period of the Draft EIR and includes responses to these comments and associated changes made to the EIR in the form of an Errata.
The EIR includes any exhibits or appendices thereto, the list of persons, organizations and public agencies which commented on the EIR, the comments which were received by the City regarding the EIR, and the City's written responses to comments raised in the public review and comment process, all of which are incorporated herein and made a part hereof by reference. Pursuant to State CEQA Guidelines Section 15084, the EIR has been reviewed and analyzed by the City of Menifee as the lead agency with respect to the Project and the EIR. The following findings for the Project and each fact in support of a finding are thus based upon substantial evidence in the record.
4.0 FINDINGS REGARDING ENVIRONMENTAL IMPACTS DETERMINED TO HAVE NO
IMPACTS OR BE LESS THAN SIGNIFICANT
The City finds, based upon the analysis presented in Section 4.0 of the Draft EIR, dated August 2023, that the following environmental effects of the Project either have no impact or are less than significant, and, therefore, no mitigation measures are required. The City hereby finds that existing regulatory requirements, policies, and/or Project conditions have been identified and incorporated into the Project which avoids or substantially lessens the potentially significant effect on the environment to a less than significant level.
4.1 Aesthetics
Impact 4.1-1: Less than Significant Impact
Project development on site would comply with the Development Standards, Design Guidelines, and Landscape Guidelines established in the proposed Specific Plan. These standards and guidelines themselves were developed using the City’s General Plan and Design Guidelines (April 2020), including the City’s Industrial Good Neighbor Policies as guidance. The City’s General Plan Environmental Impact Report (September 2013) found that upon implementation of General Plan policies and adherence to the City’s Municipal Code, implementation of the General Plan, which includes build out of the Project site, would not substantially degrade scenic vistas in Menifee and that impacts to scenic vistas would Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 117
Menifee Mayor and City Council
February 7, 2024
Page
503 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 7
be less than significant. While the proposed Project anticipates a different manner of development for the site, the Development Standards, Design Guidelines, and Landscape Guidelines established in the proposed Specific Plan have been developed using the City’s General Plan and Design Guidelines.
It is reasonable to conclude that the proposed Project would equally satisfy the appropriate General Plan policies and applicable provisions of the Municipal Code to prevent any significant impact to scenic vistas in the city.
The proposed off-site improvements along SR-74, Menifee Road, and Briggs Road would comply with the Menifee Valley Specific Plan (MVSP) Landscape Guidelines provided for the streetscape design along perimeter roadways, including SR-74 and Menifee Road. Additionally, improvements to SR-74 include undergrounding the existing transmission lines and poles along the Project’s northern frontage in accordance with City General Plan Policy CD-4.8, which would improve views of scenic resources for views south across the Project site from SR-74. Incorporation of General Plan policies and adherence to the City’s Municipal Code would ensure impacts to scenic vistas would be less than significant with implementation of the additional off-site roadway improvements along Mathews Road (Case Road), McCall Boulevard, and east of McLaughlin Road. In addition, no structures that could block scenic vistas are proposed in off-site improvement areas.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not significantly affect scenic vistas. Potential aesthetic impacts to scenic views are considered less than significant. Consequently, no mitigation measures are required for this less than significant impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.1-9 through 4.1-39.
Impact 4.1-2: Less than Significant Impact
The Caltrans Scenic Highway Program identifies SR-74 along the Project’s northern frontage as an Eligible State Scenic Highway, and the City General Plan designates Menifee Road immediately west of the Project site as an Eligible County Scenic Highway. However, the Project site does not contain large trees or historic buildings. Therefore, development of the Project would have no impact on trees or historic buildings within a designated scenic highway. Further, in accordance with City General Plan Goal OSC-3 and Policies OCS-3.1 through OCS-3.4, Granite Hill would be preserved in its current condition. Views to Granite Hill for eastbound travelers on SR-74 are currently partially obstructed by the buildings at Heritage High School. As Granite Hill is a distant feature visible from SR-74 (but not on or adjacent to SR-74), and because views of this feature are currently partially obstructed, the proposed Project would not significantly damage the visibility of a scenic resource within a State scenic highway.
Off-site improvement areas are existing roadways and do not contain scenic resources, such as trees or rock outcroppings. In addition, incorporation of General Plan policies and adherence to the design standards of the City’s ordinances would ensure impacts to scenic resources within a State scenic highway would be less than significant with implementation of off-site improvements.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 118
Menifee Mayor and City Council
February 7, 2024
Page
504 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 8
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not significantly affect scenic highways and corridors.
Potential aesthetic impacts to scenic highways and corridors are considered less than significant.
Consequently, no mitigation measures are required for this less than significant impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.1-39 through 4.1-41.
Impact 4.1-3: Less than Significant Impact
The City of Menifee Zoning Map designates the Project site as “Menifee Valley Ranch SP” (SP 301), which provides for the development of parks, open space, greenbelt, and residential uses. Upon approval of the Project entitlements, the construction and operation of the proposed uses would comply with the development standards and design standards and guidelines in the new MVSP. The visual character and quality of the site and surrounding area would be preserved and enhanced through the application of the architectural and landscape design guidelines set forth by the Specific Plan. Additionally, future development on the Project site would be subject to the City’s Design Review process, which provides for the review of the physical improvements to the site, including the overall scale of the buildings, setbacks, massing, design, and landscape.
The proposed off-site improvements would widen existing roadways in accordance with the General Plan Circulation Element. Improvements to these roadways would improve the aesthetic quality of these roadways through the development of street trees, parkways, and sidewalks in accordance with the landscape guidelines set forth by the Specific Plan, which are consistent with the applicable provisions of the City’s General Plan. In addition, incorporation of General Plan policies and adherence to the City’s Municipal Code would ensure impacts to the visual character and quality of the City would be less than significant with implementation of the off-site improvements.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would be consistent with applicable zoning and other regulations governing scenic quality at the project site. Potential impacts are considered less than significant. Consequently, no mitigation measures are required for this no impact determination.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.1-41 through 4.1-45.
Impact 4.1-4: Less than Significant Impact
The Project would introduce new sources of light into the Project area through development of residential, commercial, business park, public facility, open space, and roadway uses. Various forms of lighting (e.g., light poles, building façades, building, security, etc.) would be installed throughout the Project site in accordance with the lighting guidelines set forth in the Specific Plan in order to Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 119
Menifee Mayor and City Council
February 7, 2024
Page
505 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 9
reduce potential light and glare impacts on neighboring properties and the night sky. Additionally, development standards set forth in the Specific Plan would require open space, residential, and business park/public facility uses to comply with the respective Light Zone requirements prescribed in Chapter 9.205 of the City Municipal Code.
Although the Project site is located within the airport influence area of the March Air Reserve Base/Inland Port Airport and Compatibility Zone E of the [March Air Reserve Base/Inland Port Airport] Riverside County Airport Land Use Compatibility Plan (ALUCP), Regulatory Compliance Measure (RCM) HAZ-2 would be implemented to prevent potential light and glare hazards on aviation.
Improvements to roadways and the development of a non-vehicular bridge over the BNSF Railway tracks would include lighting features developed in accordance with the lighting standards set forth by the Specific Plan, Caltrans, and City’s public street standards. Compliance with RCM HAZ-2 would ensure that outdoor lighting would not create a new source of substantial light or glare that would adversely affect aviation and day or nighttime views. In addition, incorporation of General Plan policies and adherence to the City’s Municipal Code would ensure impacts associated with light and glare would be less than significant with implementation of the off-site improvements.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not create a new source of substantial light or glare which would adversely affect day or nighttime views in the area. Potential impacts are considered less than significant. Consequently, no mitigation measures are required for this less than significant impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.1-45 through 4.1-48.
4.2 Agriculture and Forestry Resources
Impacts 4.2-1: Less than Significant Impact
State CEQA Guidelines Appendix G defines three of the Farmland Mapping and Monitoring Program categories including Prime Farmland, Unique Farmland, and Farmland of Statewide Importance, as Important Farmland. The Project site consists of Farmland of Local Importance; therefore, development of the Project would not result in conversion of Farmland of Statewide Importance.
Further, impacts to agricultural uses on site have been previously analyzed in the EIR for SP301, which is the existing entitled land use plan for the project site.
Off-site improvements include extension and connection of utilities and widening existing roadways.
Portions of these roadways are designated as Prime Farmland; however, impacts to converting Farmland to roadway uses have already been evaluated in the City’s General Plan EIR.
Finding: The City adopts CEQA Finding 1.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 120
Menifee Mayor and City Council
February 7, 2024
Page
506 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 10
The City hereby finds that the Project would not generate substantial impacts to Prime Farmland, Unique Farmland, and Farmland of Statewide Importance. Potential impacts are considered less than significant. Consequently, no mitigation measures are required for this less than significant impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR, pages 4.2-13 through 4.2-16.
Impacts 4.2-2, 4.2-3, and 4.2-4: No Impact
The Project site and off-site improvement areas are not zoned for agricultural use and are not under a Williamson Act contract. Development of the Project would not conflict with an agricultural zoning or Williamson Act contract. The Project site and off-site improvement areas are also not zoned as forest land, timberland, or timberland production; therefore, development of the Project and off-site improvement areas would not conflict with forestry zoning. In addition, the Project site and off-site improvement areas do not contain forest resources; therefore, development of the Project and off- site improvement areas would not result in the loss or conversions of forest land.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not conflict with existing agricultural or forestry zoning designation or a Williamson Act contract. In addition, the proposed Project would not result in the loss or conversion of forest land. No impacts are expected to occur. Consequently, no mitigation measures are required for this less than significant impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR, pages 4.2-16 through 4.2-19.
Impacts 4.2-5: Less than Significant Impact
Implementation of the proposed Project would not involve other changes in the existing environment that could result in the conversion of farmland to nonagricultural use, or conversion of forest land to non-forest use. The Project site contains undeveloped agricultural land currently being used for grain crop production pursuant to a 1-year lease between the Applicant and a local farmer; however, the lease would expire before Project construction. Therefore, the City does not plan for the Project site to be used for agricultural production in the future. There are no forest or timberland resources on, or in the vicinity of, the Project site. Therefore, Project implementation would not contribute or catalyze the conversion of forest land to non-forest use.
The City’s General Plan EIR evaluated impacts related to converting Important Farmland to non- agricultural uses and found “General Plan buildout would convert mapped Important Farmland to non-agricultural uses” and impacts would be potentially significant without mitigation; however, the City’s General Plan EIR also concluded “no mitigation measures are available that would reduce mapped farmland impacts to less than significant. State-designated farmland impacts are significant and unavoidable”. As such, construction and operation of off-site improvements have already been Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 121
Menifee Mayor and City Council
February 7, 2024
Page
507 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 11
evaluated in the City’s General Plan EIR which was certified with CEQA Findings and an adopted Statement of Overriding Considerations for significant impacts. Additionally, off-site improvements are existing roadways and do not include forest land or agricultural land.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not involve other changes in the existing environment which due to their location or nature could result in the conversion of farmland to non-agricultural use or the conversion of forest land to non-forest use. Potential impacts associated with off-site improvements would be less than significant. Consequently, no mitigation measures are required for this less than significant impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.2-19 through 4.2-22.
4.3 Air Quality
Impact 4.3-4: Less than Significant Impact
During construction activities, construction equipment exhaust and application of asphalt and architectural coatings would temporarily and intermittently generate odors. As noxious odors would be confined to the immediate vicinity of the construction equipment, unlikely to affect a substantial number of people, and would be diluted to well below any level of air quality concern by the time such emissions reached any sensitive receptor sites, impacts would be less than significant.
Furthermore, short-term construction-related odors are expected to cease upon the drying or hardening of the odor-producing materials and would be required to comply with odor policies enforced by the South Coast Air Quality Management District (SCAQMD), including Rule 402, which prohibits nuisance odors and identifies enforcement measures to reduce odor impacts to nearby receptors.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not create objectionable odors affecting a substantial number of people. Potential impacts are considered less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.3-48 through 4.3-49.
4.4 Biological Resources
Potential significant impacts can be mitigated to a level of less than significant. Refer to Section 5.0, below.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 122
Menifee Mayor and City Council
February 7, 2024
Page
508 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 12
4.5 Cultural Resources
Impact 4.5-3: Less than Significant Impact
No known human remains, including Native American, have been identified or otherwise known to be present on the Project site or within the off-site improvement areas. In the unlikely event that human remains are encountered during project construction, the proper authorities (i.e., Riverside County Coroner) shall be notified, and standard procedures for the respectful handling of human remains during the earthmoving activities will be followed. Construction contractors are required to adhere to CCR Section 15064.5(e), PRC Section 5097, and Section 7050.5 of the State’s Health and Safety Code. In addition, the Pechanga Band of Indians (Pechanga) and the Soboba Band of Luiseño Indians (Soboba) have requested site-specific mitigation to address potential unanticipated encounters with human remains in accordance with PRC 21080.3.2, and RCM TCR-1, RCM TCR-2, RCM TCR-3, and RCM TCR-4 were identified to ensure that human remains, if found during Project construction, would be protected. Compliance with CCR Section 15064.5(e), PRC Section 5097.98, and Section 7050.5 of the State’s Health and Safety Code, and implementation of RCM CUL-4 and RCM CUL-5, would ensure that any potential impacts to unknown buried human remains would be less than significant.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not disturb any human remains, including those interred outside of dedicated cemeteries. Potential impact would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.5-16 through 4.5-19.
4.6 Energy
Impact 4.6-1: Less than Significant Impact
Project construction and operation would have a negligible effect on local and regional energy supplies. As such, electrical and natural gas demand associated with Project construction and operations would not be considered inefficient, wasteful, or unnecessary in comparison to other similar developments in the region. Furthermore, impacts related to energy use during construction would be temporary and relatively small in comparison to Riverside County’s overall use of the State’s available energy resources. Furthermore, the proposed Project would be required to adhere to all federal, State, and local requirements for energy efficiency, including Title 24 standards.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not result in a significant impact due to wasteful, inefficient, or unnecessary consumption of energy resources during Project construction or operation.
Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 123
Menifee Mayor and City Council
February 7, 2024
Page
509 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 13
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.6-8 through 4.6-17.
Impact 4.6-2: Less than Significant Impact
Because California’s energy conservation planning actions are conducted at a regional level, and because the proposed Project’s total impact on regional energy supplies would be minor, the proposed Project would not conflict with or obstruct California’s energy conservation plans as described in the California Energy Commission’s (CEC’s) Integrated Energy Policy Report. Additionally, as discussed above, the proposed Project would not result in the inefficient, wasteful, and unnecessary consumption of energy.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not conflict or obstruct a state or local plan for renewable energy or energy efficiency. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.6-17 through 4.6-18.
4.7 Geology and Soils
Impact 4.7-1 (i through iv): Less than Significant Impact The Project site is not located within an Earthquake Fault Zone as defined by the State of California in the Alquist-Priolo Earthquake Fault Zone Act of 1972 or as defined by the City’s Local Hazard Mitigation Plan. In addition, the Project site is not located within an area where local geological and groundwater conditions suggest a potential for liquefaction. The City of Menifee General Plan identifies the granitic hill on the Project site as an area where local topographic and geological conditions have the potential for earthquake-induced landslides; however, the Geotechnical Evaluation’s review of a previous report for the Project site determined the proposed development is not included in areas mapped as potentially susceptible to earthquake-induced landslides.
The design and construction of on-site Project uses would be required to adhere to the provisions of the California Building Code (CBC). Compliance with these State regulations would reduce hazards from strong seismic ground shaking. In addition, future development of Project structures would be required to have a site-specific geotechnical investigation report prepared by the Applicant’s geotechnical consultant, in accordance with Appendix J Section J104 (Engineered Grading Requirements) of the CBC (see RCM GEO-1); such investigation would determine seismic design parameters for the Project building types pursuant to CBC requirements.
The off-site improvements areas are not located within an Earthquake Fault Zone as defined by the State of California in the Alquist-Priolo Earthquake Fault Zone Act of 1972 or as defined by the City’s Local Hazard Mitigation Plan. Similar to the Project site, none of the off-site improvement areas are located within an area mapped as potentially susceptible to earthquake-induced landslides and most Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 124
Menifee Mayor and City Council
February 7, 2024
Page
510 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 14
of the off-site improvement areas are not located within an area where local geological and groundwater conditions suggest a potential for liquefaction. Some roadway improvements along McCall Boulevard may cross areas of liquefaction potential; however, with compliance with General Plan policies, City standards and recommendations of a project-specific geotechnical evaluation, impacts resulting from strong seismic-related ground failure, including liquefication, within off-site improvement areas are anticipated to be less than significant. Further, off-site improvements do not include the construction of buildings.
The design and construction of on-site Project uses would be required to adhere to the provisions of the CBC. Compliance with these State regulations would reduce hazards from strong seismic ground shaking. Additionally, improvements to off-site roadways would comply with City standards and recommendations of the geotechnical evaluation report related to asphalt concrete pavement sections. Further, off-site improvements do not include the construction of buildings.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not directly or indirectly cause substantial adverse effects, including the risk of loss, injury, or death involving the rupture of a known Alquist-Priolo Earthquake Fault, strong seismic ground shaking, liquefaction, or landslides. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.7-11 through 4.7-18.
Impact 4.7-2: Less than Significant Impact
All Project grading would be subject to local and State codes and requirements for erosion control and grading, such as SCAQMD Rules 402 and 403, which would reduce construction erosion impacts.
The Project uses constructed would also be subject to National Pollutant Discharge Elimination System (NPDES) permitting regulations, including the development and implementation of a Storm Water Pollution Prevention Plan (SWPPP) for each phase of the Project, which would include best management practices (BMPs) in compliance with the Construction General Permit (CGP) during grading and construction as outlined in RCMs WQ-1, WQ 2, and WQ-3. Finally, developed areas on the Project site, including maintained landscaped and open space areas, would be required to adhere to BMPs identified in the Final Water Quality Management Pan (WQMP) pursuant to RCM WQ-4 to minimize post-construction erosion impacts during project operation. Future Project-related grading activities would also be required to adhere to Chapter 8.26 (Grading Regulations) of the City’s Municipal Code, requirements of the Geotechnical Evaluations prepared for the Project site, and CBC (RCM GEO-1). In addition, all recommendations presented in the Final Geotechnical Assessment for the Project shall be implemented to the satisfaction of the City’s Building and Safety Director or designee to ensure reduced effects to geology and soils on the site during Project construction and operation (RCM GEO-2).
Finding: The City adopts CEQA Finding 1.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 125
Menifee Mayor and City Council
February 7, 2024
Page
511 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 15
The City hereby finds that the Project would not result in substantial soil erosion or the loss of topsoil.
Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.7-18 through 4.7-23.
Impact 4.7-3: Less than Significant Impact
Proposed Project development on-site would not occur within areas mapped as potentially susceptible to earthquake-induced landslides. The off-site areas are relatively flat and not susceptible to earthquake-induced landslides. In addition, liquefaction potential both on- and off-site is considered low. Thus, impacts from lateral spreading and liquefaction would be less than significant.
However, young alluvium, topsoil, undocumented fill soils, colluvium, and weathered older alluvium on the Project site and off-site improvement areas are potentially compressible in their present state and may settle under the surcharge of fills or foundation loading. To address and avoid the potential for land subsidence, soils would be removed down to competent dense materials as determined by the geotechnical engineer during grading in accordance with identified recommendation.
Additionally, the Project would implement recommendations from the Final Geotechnical Assessment as required by RCM GEO-2 to ensure compliance with the most current CBC requirements.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the Project, and would not result in on- or off-site landslides, lateral spreading, subsidence, liquefaction, or collapse. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.7-23 through 4.7-26.
Impact 4.7-4: Less than Significant Impact
The Project site and off-site improvement areas contain soils that are expected to have a very low to low potential for expansive soil. In the event that, following the completion of grading, it is determined that near-surface soils within building pad areas exhibit an elevated expansion potential, the potential impact of those expansive soils would be addressed through design of structural foundations and floor slabs in compliance with applicable requirements in the CBC and the recommendations in the Geotechnical Evaluations (RCM GEO 1 and RCM GEO-2). Additionally, off-site improvements do not include the construction of buildings and would comply with City standards and recommendations of the geotechnical evaluation report (RCM GEO 1 and RCM GEO-2) related to asphalt concrete pavement sections. Since the potential for expansive soils is low and any potential expansion would be addressed through compliance with applicable State and local Code requirements, the Project would not create substantial potential risks to life or property.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 126
Menifee Mayor and City Council
February 7, 2024
Page
512 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 16
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not be located on expansive soil and would create a direct or indirect risk to life or property. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.7-26 through 4.7-27.
Impact 4.7-5: No Impact
The on-site Project uses and off-site improvements would not include the use of septic tanks or alternative wastewater disposal systems because sanitary sewer and wastewater facilities are available in the vicinity of the Project site.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not require the use of septic tanks or alternative wastewater disposal systems. No impact would occur. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.7-27 through 4.7-28.
4.8 Greenhouse Gas Emissions
Impact 4.8-2: Less than Significant Impact
The proposed Project would be consistent with the California Air Resources Board (CARB) Scoping Plan and the SCAG RTP/SCS because future projects associated with the proposed Project would be required to comply with the latest Title 24, CALGreen Code standards regarding energy conservation requirements and water efficiency, and the California Model Water Efficient Landscape Ordinance. In addition, electricity would be provided by Southern California Edison (SCE), which is required to increase its renewable energy sources to meet the Renewable Portfolio Standards mandate of 60 percent renewable supplies by 2030. As such, the proposed Project would not conflict with applicable energy or water conservation and efficiency standards of the CARB Scoping Plan.
Because the proposed Project is envisioned as a higher density housing development adjacent to commercial and employment opportunities to encourage pedestrian access and provide a consumer base for commercial uses and to help meet the existing and future housing needs of Menifee residents, the proposed Project would not conflict with applicable transportation and motor vehicle measures. Overall, the proposed Project would be consistent with the CARB Scoping Plan.
Since the purpose of the proposed Project is to accommodate planned regional housing and employment growth in the city and off-site roadway improvements are consistent with the City’s Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 127
Menifee Mayor and City Council
February 7, 2024
Page
513 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 17
planned roadway network, the proposed Project would not exceed the growth assumptions in the SCAG’s RTP/SCS and it is anticipated that implementation of the proposed Project would not interfere with SCAG’s ability to implement the regional strategies outlined in the RTP/SCS. Therefore, the proposed Project would not conflict with an adopted plan, policy, or regulation pertaining to GHG emissions.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing emissions of greenhouse gases. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.8-33 through 4.8-38.
4.9 Hazards and Hazardous Materials
Impact 4.9-1: Less than Significant Impact
Construction of the proposed Project, including on- and off-site improvements, would temporarily increase the regional transport, use, and disposal of commonly used construction-related hazardous materials and petroleum products (e.g., diesel fuel, lubricants, paints and solvents, and cement products containing strong basic or acidic chemicals); however, due to the limited quantities of these materials to be used by the proposed Project, they are not considered hazardous to the public at large.
The transport, use, and storage of hazardous materials during construction will be regulated by the Riverside County Fire Department and the California Occupational Safety and Health Administration.
Additionally, the United States Department of Transportation Office of Hazardous Materials Safety prescribes strict regulations for the safe transportation of hazardous materials by truck and rail on State highways and rail lines, as described in Title 49 of the Code of Federal Regulations, and implemented by Title 13 of the CCR. The Phase II ESA concluded soils on the Project site did not exceed accepted screening levels of OCP, VOCs, TPH, or Title 22 Metals. Therefore, no remediation and/or export of potentially contaminated on-site soils would be required.
Further, the Project would comply with applicable waste discharge permit requirements to avoid potential impacts to water quality due to spills or runoff from hazardous materials used during construction pursuant to RCMs WQ-1 through WQ-4, provided in Section 4.10. Adherence to applicable local, state, and federal regulations related to the transport, use, and storage of hazardous materials and RCMs WQ-1 through WQ-4, impacts related to hazardous materials during construction would be less than significant.
During operation of the proposed Project, businesses that may handle hazardous materials in reportable quantities as described by the Riverside County Department of Environmental Health (DEH) would be subject to the regulations within Chapter 9.210.090 (Hazardous Materials) of the City Development Code and would be required to prepare a Hazardous Materials Business Plan (HMBP) via California Environmental Reporting System (CERS) as described in RCM HAZ-1. A HMBP is not Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 128
Menifee Mayor and City Council
February 7, 2024
Page
514 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 18
required per DEH regulations due to the absence of hazardous materials being stored or handled in the off-site improvement areas. Due to the type and nature of the uses that would operate on the Project site, the applicability of hazardous materials regulations for potential future businesses, and adherence to RCM HAZ-1, operation of the Project would result in less than significant impacts related to the routine transport, use, or disposal of hazardous materials.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not create a significant hazard to the public or environment through the routine transport, use, or disposal of hazardous materials. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.9-10 through 4.9-15.
Impact 4.9-2: Less than Significant Impact
As discussed above, construction of the proposed Project, including on- and off-site improvements, would involve use of hazardous materials and could result in accidental releases of hazardous materials. However, RCMs WQ-1, WQ-2, WQ-3, and WQ-4 would require compliance with the waste discharge permit requirements to ensure construction contractors maintain equipment and supplies on site for containing and cleaning up hazardous materials spills and would train workers in such containment and cleanup. In the event of an accidental hazardous materials release of toxicity and/or quantity that on-site workers would be unable to safely contain and clean up, the construction contractor would notify the Riverside County DEH of the release immediately. With compliance with RCMs WQ-1, WQ-2, WQ-3, and WQ-4, the use, storage, transport, and disposal of hazardous materials during construction would not cause significant hazards to the public or the environment through accidental releases of hazardous materials.
As discussed above, commercial land uses utilizing hazardous materials in reportable amounts during operation of the proposed Project would be required to prepare and submit an HMBP as described by RCM HAZ-1. Due to the type and nature of the uses that would operate on the Project site, the applicability of hazardous materials regulations for potential future businesses, and adherence to RCM HAZ-1, operation of the Project would result in less than significant impacts related to the accidental releases of hazardous materials. Further, the types and amounts of hazardous materials used and generated for maintenance of off-site improvements would not represent a significant risk related to the accidental release of hazardous materials, as they are commonly used throughout the city’s residential and roadway land uses.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not create a significant hazard to the public or environment through the reasonably foreseeable upset and accident condition involving the release of hazardous material into the environment. Potential impacts would be less than significant.
Consequently, no mitigation measures are required for this impact.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 129
Menifee Mayor and City Council
February 7, 2024
Page
515 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 19
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.9-15 through 4.9-17.
Impact 4.9-6: Less than Significant Impact
Site preparation, grading, and construction of the proposed Project, including off-site improvements, may require temporary lane closures/road closures on SR-74, Menifee Road, and Briggs Road to allow for utility connections and improvements to the surrounding circulation system. These temporary lane closures/road closures would be implemented through a Construction Traffic Management Plan (CTMP), pursuant to RCM TRA-1, which, among other things, recommends early coordination with affected agencies to ensure that emergency vehicle access is maintained. In this manner, officials can plan and respond appropriately to direct the public away from SR-74, Menifee Road, and Briggs Road, as appropriate, in the event of an emergency requiring evacuation. Access would be maintained to allow emergency response teams to quickly enter and exit the site unimpeded. Therefore, through implementation of a CTMP in accordance with RCM TRA-1, construction activities would not substantially impair an adopted emergency response plan or emergency evacuation plan.
The proposed Project would include roadway improvements to address roadway deficiencies; however, implementation of the proposed Project and the proposed roadway improvements would not alter any facility or propose a physical change that would interfere with the City’s Emergency Operations Plan (EOP). Therefore, implementation of the Project would not interfere with the adopted emergency response plan and/or the emergency evacuation plan.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.9-26 through 4.9-28.
Impact 4.9-7 Less than Significant Impact
The Project site and off-site improvement areas are located within the Local Responsibility Area (LRA) for the City of Menifee and is not located within a Very High Fire Hazard Severity Zone (VHFHSZ) or identified within any Fire Threat Zones. The Project would also be subject to the regulations of the most recently adopted Riverside County Fire Department Fire Code, California Fire Code (CFC), and the California Building Code (CBC) to avoid potential impacts from the Project’s potential to exacerbate wildfire risks. In addition, no habitable structures are proposed within the off-site improvement areas.
With adherence to the mentioned regulations, anticipated maintenance of the Project site landscaping, and the absence of a VHFHSZ on the Project site, impacts related to the Project exposing Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 130
Menifee Mayor and City Council
February 7, 2024
Page
516 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 20
people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires would be less than significant.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not expose people or structures to significant risk of loss, injury, or death involving wildland fires. Potential impacts would be less than significant.
Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.9-28 through 4.9-29.
4.10 Hydrology and Water Quality
Impact 4.10-2: Less than Significant Impact
During construction of the proposed Project, groundwater dewatering may be required due to the fact that groundwater levels fluctuate with the seasons and local zones of perched groundwater may be present near the surface; however, the amount of water that would be extracted would not be substantial and would only occur temporarily during construction. Therefore, any temporary dewatering required by construction would not significantly decrease groundwater supplies or interfere with groundwater recharge in a manner that may impede sustainable groundwater management.
Under existing conditions, the soils on the Project site have low permeability and the Project site is not a source of significant groundwater recharge. Therefore, the increase in impervious surface area that will result from the development of the proposed Project would not interfere with groundwater recharge. Further, a Water Supply Assessment was prepared for the proposed Project by Eastern Municipal Water District (EMWD) and determined that the proposed Project would have adequate water supplies during normal, dry year, and multiple dry year demands. Therefore, it is expected that the proposed Project would rely on existing groundwater entitlements to serve the proposed Project’s water needs and would not contribute to a substantial depletion of groundwater supplies.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the Project would impede sustainable groundwater management of the basin. Potential impacts would be less than significant.
Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.10-38 through 4.10-41.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 131
Menifee Mayor and City Council
February 7, 2024
Page
517 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 21
4.11 Land Use and Planning
Impact 4.11-1 Less than Significant Impact
Under current Project site conditions, the railroad line and Matthews Road act as a distinct barrier within the current Menifee Valley Ranch SP area. For planning purposes, the Project proposes to remove the undeveloped Project site from the current Menifee Valley Ranch SP 301 to the north. The proposed on-site and off-site roadways along the perimeter of the site would be designed to connect the proposed Project to the surrounding areas and the proposed bike- and pedestrian-only bridge that would connect the community of Heritage Lake to the Project site and two industrial collector streets and residential entry streets to provide additional vehicular connectivity to the surrounding areas. With these design features, and due to the already dividing feature of the railroad tracks separating the Heritage Lake community and the future Menifee Valley Specific Plan area, the Project would have a less than significant impact on dividing an established community.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not physically divide an established community. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.11-8 through 4.11-9.
4.12 Mineral Resources
Impact 4.12-1 and 4.12.2: No Impact
The City’s General Plan Open Space and Conservation Element designates the Project site and off-site areas as either Urban Area, which is not considered a Mineral Resource Zone (MRZ) classification, or MRZ-3, which are areas where the significance of mineral deposits cannot be determined from the available data. There are no known significant mineral resources designated in the City, and it is unlikely that significant mineral resources would be designated in the city in the future. Further, there are no active mineral resource recovery sites mapped within Menifee on the Mines Online map maintained by the California Office of Mine Reclamation and, according to the California Department of Conservation Geologic Energy Management Division (Cal GEM) Well Finder map, the Project site is not located in or near any oil fields, and there is no oil well facilities or underground gas storage facilities on or near the Project site. Additionally, mineral resources extraction is not a use compatible with the existing on-site and surrounding land uses, nor is the Project site sufficient in size or location to support productive or cost-effective mineral extraction.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not result in the loss of availability of a known mineral resources that would a value to the region or the residents of the state or result in the loss of availability of a local important mineral resource recovery site delineated on a local general plan, Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 132
Menifee Mayor and City Council
February 7, 2024
Page
518 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 22
specific plan, or other land use plan. No impacts would occur. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.12-5 through 4.12-9.
4.13 Noise
Impact 4.13-1: Less than Significant Impact
Construction-related traffic noise for both on-site and off-site improvements would increase by up to
0.03 dBA during construction of the proposed Project. Because a noise level increase of less than 3 dBA would not be perceptible to the human ear in an outdoor environment, noise impacts from short- term construction-related traffic associated with worker commutes and transport of construction equipment and material to the off-site roadway improvement locations would be less than significant.
Although the noise generated by Project construction activities would be higher than the ambient noise levels, construction noise would stop once Project construction is completed and implementation of RCM N-1 would be required to minimize construction noise at residential land uses.
Traffic noise impacts from on-site operations of the proposed Project would also be less than significant because traffic noise levels at the noise-sensitive areas of residences and the school would not exceed the City’s noise standard of 65 dBA CNEL even though the proposed Project would result in a substantial increase in ambient noise levels under the opening year (2026) Phases 2 and 3 cumulative traffic condition. In addition, the substantial increase in ambient noise levels would diminish over time to less than substantial due to ambient growth in the Project area. The proposed Project would not generate traffic from off-site roadway and infrastructure improvements. Therefore, no traffic noise impacts would occur from off-site roadway and infrastructure improvements.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate a substantial temporary or permanent increase in ambient noise levels in the vicinity of the Project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.13-16 through 4.13-54.
Impact 4.13-3: No Impact
Based on the Riverside County Airport Land Use Compatibility Plan, the Project site and off-site improvement areas are outside the 55 dBA CNEL noise contours of the Perris Valley Airport, which is
3.8 miles northwest of the Project site. In addition, the off-site roadway and infrastructure improvements would not involve the introduction of residential or employment uses in the Project area. Therefore, the proposed Project would not expose people residing or working in the Project area to excessive noise levels from aircraft-related operations.
Finding: The City adopts CEQA Finding 1.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 133
Menifee Mayor and City Council
February 7, 2024
Page
519 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 23
The City hereby finds that the Project would not expose people residing or working in the Project area to excessive noise levels due to proximity to an airport. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.13-59 through 4.13-60.
4.14 Population and Housing
Impact 4.14-1: Less than Significant Impact
Due to construction workers representing nearly 10 percent of the City’s workforce and the continued demand for construction labor in the City, it can be reasonably determined that construction workers would be available to serve the construction needs of the site and would not be expected to relocate their places of residence as a consequence of working on the Project. Therefore, the Project would result in a less than significant impact associated with inducing substantial population growth or demand for housing through increased construction employment.
SP 301 was approved for an overall development of 4,407 dwelling units, with 1,718 of those units within the boundary of the Project site. The Project proposes the development of up to 1,718 units; therefore, the Project would not reduce the number of residential units on the Project site in accordance with SB 330. Additionally, the Project would not induce unplanned population growth from additional residential uses on the Project site. In addition, the current unemployment rates for the City suggests an ample available local and regional labor pool to serve the long-term employment opportunities offered by the Project site and makes it unlikely that the Project’s labor demand would need to draw substantial number of employees from outside the region to meet the need for employees resulting from development of the Project site. The Project would provide jobs close to home for current and future city residents, and thus the Project would serve to improve the housing- jobs balance in the northeastern portion of the city. Further, because proposed infrastructure improvements would only serve the Project site, it is not anticipated that the associated Project site infrastructure improvements would not indirectly or directly induce population or growth.
Off-site improvements include widening public roadways in conformance with the City’s General Plan Circulation Element. Therefore, roadway improvements within SR-74, Menifee, and Briggs Roads are consistent with the City’s planned roadway network and would not result in indirect unplanned growth within the City.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not induce substantial unplanned population growth in the area, either directly or indirectly. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.14-6 through 4.14-9.
Impact 4.14-2: Less than Significant Impact
In its existing condition, the Project site is undeveloped land that consists primarily of agricultural land. As such, implementation of the proposed Project would not displace any existing housing or Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 134
Menifee Mayor and City Council
February 7, 2024
Page
520 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 24
populations at the Project site. In addition, off-site improvement areas are partially developed with paved roads and undeveloped right-of-way dedication. Therefore, construction of off-site improvements would also not displace any existing housing or populations.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.14-9 through 4.14-11.
4.15 Public Services
Impact 4.15-1: Less than Significant Impact
Construction activities associated with the proposed Project have the potential to affect fire protection services, such as emergency vehicle response times, by potentially requiring circulation detours, road closures, and lane closures during off-site improvements. Consistent with standard City conditions of approval, a CTMP will be prepared for the Project pursuant to RCM TRA-1 to ensure that emergency vehicles and emergency service providers (i.e., fire department personnel) know of any detours or road closures caused by the off-site improvements and to plan for adequate navigation to off-site improvement areas. As required by the California Occupational Safety and Health Administration (CAL-OSHA) and Fire and Building Code requirements, the construction contractor would be required to carefully store flammable materials in appropriate containers during Project construction, use construction equipment with spark arrestors, immediately and completely clean up spills of flammable materials when they occur, and be trained in emergency response. Fire suppression equipment specific to the construction site would also be available and maintained on site for the duration of the construction period.
Operation of the Project may incrementally increase the demand for fire protection services but not to the degree that the existing fire stations within the City could not meet the demand. Additionally, the Project Applicant would be required to pay its fair share of current Fire Protection Facilities Development Impact Fees (DIFs) by the City of Menifee as specified by RCM PS-1.
The operation of the off-site improvements does not include land uses that would generate population within the City. Therefore, the off-site improvements have no impact on fire protection services.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate substantial impacts relating to fire protection services. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 135
Menifee Mayor and City Council
February 7, 2024
Page
521 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 25
Supportive Evidence: Please refer to Draft EIR pages 4.15-12 through 4.15-17.
Impact 4.15-2: Less than Significant Impact
Construction activities associated with the proposed Project have the potential to affect police protection services, such as emergency vehicle response times, by potentially requiring circulation detours, road closures, and lane closures during off-site improvements. Consistent with standard City conditions of approval, a CTMP will be prepared for the Project pursuant to RCM TRA-1 to ensure that emergency vehicles and emergency service providers (i.e., law enforcement personnel) know of any detours or road closures caused by the off-site improvements and to plan for adequate navigation to off-site improvement areas. To minimize criminal trespassing, the Project site (construction areas) would be fenced and, during non-construction hours, access points would be locked. Construction equipment would be stored in well-lit areas, and smaller equipment would be secured to reduce absconding from trespassers. Patrols by the Menifee Police Department (MPD) would increase during non-construction hours; however, such increases would be nominal and would be in existing patrol areas of the MPD.
Operation of the Project may incrementally increase the demand for police protection services but not to the degree that the existing police stations within the City could not meet the demand. The proposed Project would also implement Crime Prevention through Environmental Design (CPTED) techniques that would discourage and or reduce crime from occurring on site. Additionally, the Project Applicant would be required to pay its fair share of current Development Impact Fees (DIFs) by the City of Menifee as specified by RCM PS-2.
The operation of the off-site improvements does not include land uses that would generate population within the City. Therefore, the off-site improvements have no impact on police protection services.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate substantial impacts relating to police protection services. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.15-17 through 4.15-20.
Impact 4.15-3: Less than Significant Impact
The Project is consistent with the residential growth projections of the City and region. As the number of residential uses have previously been included in existing SP 301, any student population resulting from the Proposed Project have already been accounted for in the school districts’ enrollment projections. In addition, some students that may reside on-site may already reside in the city and may already attend schools within Romoland School District and Perris Union High School District. The Project would also be required to pay development fees in accordance with Government Code 65995 Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 136
Menifee Mayor and City Council
February 7, 2024
Page
522 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 26
and Education Code 17620, as required by RCM PS-3, which would ensure impacts to school would be less than significant.
The proposed Project incorporates an offer of dedication to the City for an approximately 15.5-acre site as a potential future site for an elementary school, should the Romoland School District decide an additional elementary is needed in the future. However, any future new school facilities would be subject to project-level environmental review and site-specific mitigation as appropriate in order to ensure significant environmental impacts are avoided or mitigated at the time such development actions are proposed to the City by the Romoland School District.
The operation of the off-site improvements does not include land uses that would generate population within the City. Therefore, the off-site improvements have no impact on school facilities.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate substantial impacts relating to school facilities. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.15-20 through 4.15-24.
Impact 4.15-4: Less than Significant Impact
All proposed recreation-related facilities would be developed on the Project site and therefore are encompassed in the analysis of this EIR and associated technical studies, and impacts are mitigated as appropriate. In addition, the amount of public parkland proposed by the Project (29.8 acres) would exceed the minimum required under Chapters 7.75 and 8.03 of the City of Menifee Municipal Code.
Further, the proposed Project is consistent with the planned growth of the city and region and therefore would not generate a substantial increase in population within the city. Accordingly, no negative impact related to the City’s adopted goal of 5.0 acres of parkland for every 1,000 residents would result from the proposed development.
The operation of the off-site improvements does not include land uses that would generate population within the City. Therefore, the off-site improvements have no impact on park facilities.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate substantial impacts relation to parks.
Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.15-24 through 4.15-27.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 137
Menifee Mayor and City Council
February 7, 2024
Page
523 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 27
Impact 4.15-5: Less than Significant Impact
Development of the proposed Project would increase demand for libraries and as such, the Project Applicant would be required to pay Development Impact Fees (DIFs) used to fund capital costs associated with constructing new public facility structures and purchasing equipment for libraries.
Further, the Project would not induce substantial population growth in the city or region. Any increase in land use or development intensity would be negligible, and no potential cumulative overburdening of other public facilities requiring new or physically altered facilities is expected to occur.
The operation of the off-site improvements does not include land uses that would generate population within the City. Therefore, the off-site improvements have no impact on public facilities, including libraries.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate substantial impacts to other public facilities beyond those identified in the Draft EIR. Less than significant impacts are anticipated. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.15-27 through 4.15-28.
4.16 Recreation
Impact 4.16-1: Less than Significant Impact
The proposed Project would create demand for 26.1 acres of park dedication based on the City’s Municipal Code. The proposed Project would construct 29.8 acres of public park, greenbelt, and open space pursuant to RCM REC-1. Therefore, the provision of park and recreational facilities within the Project site would be sufficient to meet the for the demand of future Project residents and employees.
Through compliance with the City Municipal Code, existing public park and recreational facilities would not be adversely impacted or be substantially degraded by the Project’s population.
Off-site improvements, including proposed road widening, would be in conformance with the City’s General Plan Circulation Element and operation of the off-site improvements does not include land uses that would increase the demand on existing public park and recreational facilities within the city and county. Therefore, the off-site improvements have no impact on existing public park and recreational facilities.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not increase the use of existing neighborhood and regional parks or other recreation facilities such that substantial physical deterioration of the facility would occur or be accelerated. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 138
Menifee Mayor and City Council
February 7, 2024
Page
524 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 28
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.16-7 through 4.16-12.
Impact 4.16-2: Less than Significant Impact
Construction and operation of the proposed park, greenbelt, open space areas, and recreation center on the Project site have been evaluated throughout this EIR under the appropriate resource sections (e.g., air quality, biological resources, etc.) and are included in the analysis of environmental impacts of the Project in this EIR. Potentially adverse impacts to the environment that may result from the creation of parkland pursuant to build out of the Project would be less than significant upon the implementation of the Specific Plan’s goals, policies, and actions and existing federal, State, and local regulations. Furthermore, subsequent City review would be required for approval and development of future park sites on the Project site. Consequently, development of the Project would result in a less than significant impact relating to new or expanded park and recreational facilities.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would include recreational facilities; however, the construction of these recreational facilities would not have an adverse physical effect on the environment.
Potential impacts are less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.16-12 through 4.16-13.
4.17 Transportation
Impact 4.17-3: Less than Significant Impact
Improvements to the existing roadway network (i.e., widening, parkways, sidewalk, curb and gutter, new lanes, etc.) and new internal roadways would be constructed to meet City standards. The proposed driveways and intersections would be designed so as to not introduce hazards due to geometric design features (e.g., sharp curves or dangerous intersections). The proposed Project’s land uses are similar to surrounding land uses and do not include incompatible uses (i.e., farm equipment, industrial equipment) and would be separated from adjacent land uses by existing roadways, providing a distance buffer for surrounding development. Therefore, the proposed Project would not introduce safety hazards due to incompatible uses.
Off-site roadway improvements to the existing roadways, which are fully improved roadways that meet City standards, would be implemented to the satisfaction of the City Engineer. No new land use would occur on the public rights-of-way. Therefore, the off-site improvements would not introduce safety hazards due to geometric design features or incompatible land uses.
Finding: The City adopts CEQA Finding 1.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 139
Menifee Mayor and City Council
February 7, 2024
Page
525 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 29
The City hereby finds that the Project would not substantially increase hazards due to a geometric design feature or incompatible uses. Potential impacts are less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.17-23 through 4.17-24.
Impact 4.17-4: Less than Significant Impact
Construction activities associated with the Project may affect emergency access and response times, due to temporary detour routes and temporary road/pedestrian/bicycle facility closures along the perimeter and interior of the Project site. Construction of the off-site improvements may also affect emergency access and response times; however, emergency service providers would still be able to access the improvement areas via Menifee Road, SR-74, and Briggs Road. In addition, partial lane closures would ensure that access on the off-site improvement roadways would continue during construction. Additionally, as specified in RCM TRA-1, the Project would be required to prepare a Construction Traffic Management Plan (CTMP) to maintain safety and adequate traffic operations on roadways affected by project construction.
During Project operations, unimpeded access throughout the Project site would be maintained by ensuring that vehicles would not be parked or placed in a manner that would impede access for emergency response vehicles. Additionally, perimeter and internal roadways would be maintained in such condition to allow for the safe and unobstructed passage of emergency response vehicles.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not result in inadequate emergency access. Potential impacts are less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.17-24 through 4.17-26.
4.18 Tribal Cultural Resources
Impact 4.18-1(ii): Less than Significant Impact
On September 21, 2021, pursuant to provisions of SB 18 and AB 52, the City provided consultation requests (via certified mail) to the following tribes:
•Agua Caliente Band of Cahuilla Indians
•Augustine Band of Cahuilla Mission Indians
•Cabazon band of Mission Indians
•Cahuilla Band of Indians
•Campo Band of Diegueno Mission Indians
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 140
Menifee Mayor and City Council
February 7, 2024
Page
526 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 30
•Ewiiaapaayp Band of Kumeyaay Indians
•La Post Band of Diegueno Mission Indians
•Los Coyotes Band od Cahuilla and Cupeno Indians
•Manzanita Band of Kumeyaay Nation
•Mesa Grande Band of Diegueno Mission Indians
•Morongo Band of Mission Indians
•Pala Band of Mission Indians
•Pechanga Band of Indians
•Quechan Tribe of the Fort Mojave Reservation
•Rincon Band of Luiseno Indians
•Ramona Band of Cahuilla
•Santa Rosa Band of Cahuilla Indians
•Soboba Band of Luiseno Indians
•Sycuan Band of Kumeyaay Nation
•Torres-Martinez Desert Cahuilla Indians
The Pechanga Band of Indians, the Agua Caliente Band of Cahuilla Indians (ACBCI), the Soboba Band of Luiseño Indians, the Rincon Band of Luiseño Indians, and the Pala Band of Mission Indians requested to remain informed and updated on the project’s progress. Pechanga and Soboba identified a tribal cultural place (TCP) within the Project site. Two cultural resources, the bedrock milling site (P-33- 003429/CA-RIC-3429) and a previously unidentified sparse flaked stone scatter (P-33-024902/CA-RIV- 12345) were also identified on the Project site by the 2019 assessment. The Project as represented in the Specific Plan has been designed to avoid the cultural resources CA-RIV-12345 and CA-RIV-3429, and therefore, the proposed Project would not affect those resources. As a result of tribal consultation, RCM TCR-1, RCM TCR-2, RCM TCR-3, and RCM TCR-4 have also been identified to reduce impacts to tribal cultural resources that may inadvertently be encountered during construction activities.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate substantial impacts on tribal cultural resources. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.18-15 through 4.18-17.
4.19 Utilities and Service Systems
Impact 4.19-1: Less than Significant Impact
Implementation of the proposed Project would require domestic water improvements as detailed in the Domestic Water Plan. These improvements would be funded and constructed by the applicant, built to EMWD standards, and maintained by the EMWD. EMWD determined that based on the Water Supply Assessment and taking into account the other new/planned projects currently tracked by Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 141
Menifee Mayor and City Council
February 7, 2024
Page
527 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 31
EMWD, the projected total water demand is within the overall limits of demand considered in the 2020 Urban Water Management Plan (UWMP). Given that the proposed Project would comply with the City and EMWD’s standard requirements for facility planning and that adequate water distribution facilities would exist to serve the Project site, implementation of the uses in the Specific Plan would not require the relocation or construction of new or expanded potable or recycled water facilities beyond the on-site improvements detailed in the Domestic Water Plan.
Implementation of the proposed Project would also require the construction of on-site wastewater conveyance infrastructure as detailed in the Sanitary Sewer Plan. These improvements would be funded and constructed by the applicant, built to EMWD standards, and maintained by the EMWD.
The increase in wastewater generated by the uses associated with the proposed Project can be accommodated within the existing design capacity of the Sun City and Perris Valley Regional Water Reclamation Facilities (RWRFs), which currently operate at 80 percent and 70 percent of their capacity, respectively.
Implementation of the proposed Project would also require the construction of on-site stormwater infrastructure as detailed in the Stormwater Drainage Plan. Overall, the peak discharge of stormwater generated by the proposed Project would not adversely affect the capacity of downstream networks, and construction or expansion of off-site stormwater drainage facilities would not be required.
Because the proposed Project would only represent a small fraction of electricity and natural gas demand in Riverside County, the uses of the proposed Project would exceed Title 24 requirements, and there would be sufficient energy supplies available, the supply and distribution network within the area surrounding the Project site would remain essentially the same as exists today except for standard on-site improvements, and level of service to off-site users would not be adversely affected.
Telephone, cable, and internet services are located along the perimeter of the Project site and would be extended into the site. Cable box locations would be carefully planned and coordinated with utility providers and the landscape architect to be unobtrusive and screened from public view where possible. The construction and expansion of these facilities would occur on the Project site during preparation and earthwork phases and are not expected to impact any telephone, cable, or internet services off site that serve the surrounding areas. Additionally, telecommunication facilities are generally installed concurrently with utility expansions, and impacts associated with the expansion of telecommunications facilities are already considered in air quality, noise, and construction traffic analysis found in this Draft EIR.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not require or result in the relocation or construction of new or expanded water, wastewater treatment, stormwater drainage, electric power, natural gas, or telecommunication facilities that would cause a significant environmental effect. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.19-14 through 4.19-23 Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 142
Menifee Mayor and City Council
February 7, 2024
Page
528 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 32
Impact 4.19-2: Less than Significant Impacts
Based on information provided by the developer and the lead agency, EMWD concluded that although the evaluated project demands exceed the 2020 UWMP demand projections, the combined demand from the project and other new/planned developments in EMWD’s service area fall below the total amount of new demand evaluated in the 2020 UWMP. In addition, RCM UT-2 was requested by EMWD to review development design conditions prior to Project construction for both on-site and off-site improvements, and to address potential changes if Project conditions have changed from the circumstances analyzed at the time the WSA was prepared. Therefore, the proposed Project would have sufficient water supplies available to serve its needs and reasonably foreseeable future development during normal, dry, and multiple dry years.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would have sufficient water supplies available to serve the Project and reasonably foreseeable future developments during normal, dry, and multiple dry years.
Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.19-23 through 4.19-25.
Impact 4.19-3: Less than Significant Impact
The amount of wastewater generated daily by the proposed Project would equate to 12.39 percent of the daily wastewater intake of the Sun City RWRF and 1.69 percent of the daily wastewater intake of the Perris Valley RWRF. Based on the existing daily treatment capacity and inflow of both plants, the Project would be adequately served by wastewater disposal and conveyance. In addition, the off- site improvements would not require wastewater treatment because the improvements to not include uses that would generate wastewater.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would be adequately served by the wastewater treatment provider’s existing capacity in addition to the provider’s existing commitments. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.19-25 through 4.19-26.
Impact 4.19-4: Less than Significant Impact
Because the Project site is vacant, solid waste generation due to demolition of existing structures would not occur. However, construction of the proposed Project would still have the potential to generate nominal amounts of solid waste that would either be recycled or disposed of at one of the Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 143
Menifee Mayor and City Council
February 7, 2024
Page
529 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 33
local landfills serving the City. Consistent with CALGreen Section 5.408.1, at least 65 percent of nonhazardous matter that occupies the Project site under existing conditions would either be disposed of or may be reused on site as a recycling/reuse practice. During operations, the proposed Project would implement a diversion rate of 75 percent of the solid waste generated daily and would be served by two landfills with sufficient permitted capacity to accommodate its solid waste disposal needs.
Construction on the off-site improvement areas may generate nominal amounts of waste that would either be recycled or disposed of at one of the local landfills serving Menifee. Due to the low acreage of improvements and their limited occurrence to existing roadways, as well as the nature of the proposed off-site improvements, off-site improvements would not result in impacts to existing landfill capacity.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not generate solid waste in excess of State or local standard or in excess of the capacity of local infrastructure or otherwise impair the attainment of solid waste reduction goals. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.19-26 through 4.19-28.
Impact 4.19-5: Less than Significant Impact
Construction and operation of the proposed Project, including construction of off-site improvements, would comply with federal, State, and local statutes and regulations related to solid waste, including the Riverside County Department of Waste Resources CIWMP and the California Integrated Waste Management Act of 1989 (AB 939). The off-site improvements, upon implementation, are not solid waste-generating land uses. Therefore, activities associated with construction and operation of the proposed Project would comply with applicable solid waste regulations.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would comply with federal, state, and local management and reduction statutes and regulations associated with solid waste. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR pages 4.19-28 through 4.19030.
4.20 Wildfire
Impact 4.20-1: Less than Significant Impact
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 144
Menifee Mayor and City Council
February 7, 2024
Page
530 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 34
The Project site and off-site improvement areas are in an LRA Non-VHFHSZ designated area and does not include any characteristics that would physically impair or otherwise interfere with emergency response or evacuation in its vicinity. Construction of the proposed Project, including off-site improvements, may require temporary lane closures/road closures to allow for utility connections and improvements to the surrounding circulation system, which would be implemented with the recommendation of the California Temporary Traffic Control Handbook (RCM TRA-1).
During operations, the proposed Project provide general and emergency access via SR-74 and Menifee Road and all roadways and structures within the Project site would be developed in accordance with City and RCFD emergency access standards. Uses and structures within the Project site would also be required to comply with all applicable codes and ordinances for emergency vehicle access, which would ensure adequate access to, from, and on the site for emergency vehicles. In addition, off-site improvements, including the widening of roadways, would be in conformance with the City’s General Plan Circulation Element and would be developed in accordance with City and RCFD emergency access standards. Therefore, construction and operation of the Project would not physically interfere with or impair an adopted emergency response or emergency evacuation plan.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not substantially impair an adopted emergency response plan or emergency evacuation plan. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.20-11 through 4.20-14.
Impact 4.20-2: Less than Significant Impact
Under existing conditions, the Project site includes numerous potential fire hazards, including unmaintained, fire-prone vegetation. Implementation of the Specific Plan would include conversion of approximately 97.5 percent of the Project site to maintained urban development with designated, drought-tolerant landscaping. The site topography would not be substantially altered, and no significant slopes would be created. The build out of the Specific Plan on the Project site would introduce new potential ignition sources in the form of building materials (e.g., wood and stucco), vegetation for landscaping, vehicles, and small machinery (e.g., for typical commercial and landscape maintenance), but it would also result in a large area separating ignition sources from native fuels as well as the conversion of existing ignitable fuels to maintained landscapes. Therefore, the Project site would function as a fuel reduction area by helping create context-sensitive development and a new first-fuel break line of defensible space. The Project would also be developed in accordance with applicable CBC, California Fire Code, and City Municipal Code regulations, including ignition-resistant materials and incorporation of fire sprinklers, to reduce the risk of wildfires in the Project vicinity and minimize the occurrence or spread of wildfire during construction and operation of the Proposed Project. Therefore, on-site improvements would not exacerbate wildfire risks due to slope, prevailing winds, or other factors.
In addition, off-site improvements would not significantly alter the topography or create new significant terrain slopes. Off-site improvements would also convert undeveloped land (fuel) within rights-of-way areas to paved roadways, resulting in a fuel reduction area and providing improved Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 145
Menifee Mayor and City Council
February 7, 2024
Page
531 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 35
emergency access. Therefore, off-site improvements would not exacerbate wildfire risks due to slope, prevailing winds, or other factors.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not exacerbate wildfire risks thereby exposing Project occupants to pollutant concentration from a wildfire or the uncontrolled spread of a wildfire. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.20-14 through 4.20-16.
Impact 4.20-3: Less than Significant Impact
Potable water, reclaimed water, and wastewater infrastructure would be installed on the Project site, and improvements to existing infrastructure in surrounding roads, including at off-site improvement areas, would occur; however, development of the Project site in accordance with applicable CBC, California Fire Code, and City Municipal Code regulations would reduce fire risk in the Project vicinity and protect power lines and infrastructure. The proposed Project would also include a new internal circulation system and improvements to surrounding roads. None of these features would exacerbate fire risk or result in temporary or ongoing impacts to the environment. Furthermore, the improved connectivity of water lines would aid in fire suppression compared to existing conditions on the Project site in the unlikely event of a wildfire. Therefore, the Project site would not require the installation or maintenance of associated infrastructure (e.g., roads, fuel breaks, emergency water sources, power lines, or other utilities) that would exacerbate fire risk or result in temporary or ongoing impacts to the environment.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not exacerbate wildfire risks associated with the installation or maintains of associated infrastructure. Potential impacts would be less than significant.
Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.20-16 through 4.20-18.
Impact 4.20-4: Less than Significant Impact
In the extremely unlikely event that a wildfire should spread to the Project site, it would not expose any on-site slopes to erosion and potential failure, contribute any additional runoff or sedimentation to the on-site drainage facilities or other downstream drainages because the Project site does not contain any steep slopes that are prone to landslides and drainage improvements would remain intact after a major wildfire, allowing them to continue to reduce the potential for flooding conditions in downstream storm drain facilities. The uses that would be developed as part of the Specific Plan would not expose people or structures to significant risks, including downslope landslides, as a result of runoff, post-fire slope instability, or drainage changes.
Additionally, off-site improvement areas do not include steep slopes prone to landslide, erosion, or downstream flooding. Therefore, downslope landslides or downstream flooding as a result of runoff, Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 146
Menifee Mayor and City Council
February 7, 2024
Page
532 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 36
post-fire slope instability, or drainage changes are unlikely to expose construction workers in the off- site improvement areas to significant risks.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project would not expose people or structures to significant risks, including downslope of downstream flooding or landslides as a result of runoff, post-fire slope instability, or drainage changes. Potential impacts would be less than significant. Consequently, no mitigation measures are required for this impact.
Mitigation Measures: No mitigation is required.
Supportive Evidence: Please refer to Draft EIR page 4.20-18 through 4.20-20.
5.0 FINDINGS REGARDING POTENTIALLY SIGNIFICANT ENVIRONMENTAL IMPACTS
WHICH CAN BE MITIGATED TO A LEVEL OF LESS THAN SIGNIFICANT The City finds, based upon the threshold criteria for significance presented in the Draft EIR, that all potentially significant environmental effects of the Project can be avoided or reduced to insignificance with feasible mitigation measures identified in the Draft EIR. No substantial evidence has been submitted to or identified by the City that indicates that the following impacts would, in fact, occur at levels that would necessitate a determination of significance.
CEQA Guidelines, Section 15126(b), requires a description of any significant environmental effects that cannot be avoided if the proposed Project is implemented.
5.1 Aesthetics
No impacts were concluded to be potentially significant.
5.2 Agriculture and Forestry Resources
No impacts were concluded to be potentially significant.
5.3 Air Quality
Impact 4.3-3: Less than Significant with Mitigation Incorporated A construction Health Risk Assessment (HRA), performed for the proposed on-site improvements, found that construction-period health risk to the surrounding off-site existing receptors would be below the SCAQMD cancer risk threshold of 10 in one million. Construction of the off-site improvements may expose surrounding sensitive receptors to airborne particulates, as well as a small quantity of construction equipment pollutants (i.e., usually diesel-fueled vehicles and equipment).
However, construction contractors would be required to implement measures to reduce or eliminate emissions by following the SCAQMD Rule 403 dust control measures. In addition, construction emissions associated with the off-site improvements would be below the SCAQMD significance thresholds. Once the off-site improvements are constructed, the proposed off-site improvements would not be a significant source of long-term operational emissions as compared to existing conditions. Implementation of Mitigation Measure MM AIR-1 would be required to ensure the Project contractors will utilize Tier 4 Final construction equipment to reduce construction criteria pollutant emissions, which would also reduce construction-related health risk impacts. Various commercial and industrial processes associated with the BP and C-BP land uses (e.g., industrial, manufacturing, Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 147
Menifee Mayor and City Council
February 7, 2024
Page
533 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 37
warehouse/storage, fulfillment center, and e-commerce) allowed under the proposed Project would be expected to release TACs. With implementation of Mitigation Measures MM AIR-1 through AIR-3, residential receptors would not be exposed to substantial pollutant concentrations associated with implementation of the on-site improvements.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with mitigation measures MM AIR-1 through MM AIR-3.
Mitigation Measures: Based upon the analysis presented in Section 4.3, Air Quality of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
MM AIR-1 During construction of the on-site improvements associated with the proposed Project, the Project contractor shall ensure all 50 horsepower or more off-road diesel-powered construction equipment is powered with California Air Resources Board (CARB)- certified Tier 4 Final engines or the equivalent, except where the Project Applicant establishes to the satisfaction of the City of Menifee (City) that Tier 4 Final equipment is not available. An exemption from these requirements may be granted by the City if the City documents that equipment with the required tier is not reasonably available within Southern California and corresponding reductions in criteria air pollutant emissions are achieved from other construction equipment to the extent feasible.
MM AIR-2Prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the following emission reduction measures. Implementation of the following measures is considered to be applicable, feasible, and effective in reducing criteria pollutant emissions generated by the Project:
•All Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, construction equipment, and generators).
•For high density and mixed-use developments, Project
Applicants shall consult with the local transit agency and incorporate all appropriate and feasible transit amenities into the plans, consistent with Section 3.1.4 Bus Rail and Transit Options in the Menifee Valley Specific Plan.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 148
Menifee Mayor and City Council
February 7, 2024
Page
534 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 38
•All Project Applicants shall implement walkable
neighborhoods by siting parks and community centers near residential areas, consistent with Section 2 Land Use
Designations and Planning Areas in the Menifee Valley
Specific Plan. All Project Applicants shall incorporate fuel- efficient heating equipment and other appliances, such as water heaters, swimming pool heaters, cooking equipment, refrigerators, furnaces, boiler units, and low or zero-emitting architectural coatings. Project Applicants shall utilize only Energy Star heating, cooling, and lighting devices, and appliances, consistent with CALGreen requirements
applicable at time of development applications.
•All Project Applicants shall utilize energy-efficient design features, including appropriate site orientation, use of lighter color roofing and building materials, and use of deciduous shade trees and windbreak trees to reduce fuel consumption for heating and cooling.
•All Project Applicants shall provide bicycle parking/storage facilities on site. Bicycle parking facilities should be near destination points and easy to find. At least one bicycle parking space for every 20 vehicle parking spaces should be provided.
•All Project Applicants shall install Class I or II bike lanes on arterial/collector streets, or where a suitable route exists, consistent with Figure 3-7 Bicycle Mobility Plan of the Menifee Valley Specific Plan.
•All Project Applicants shall provide building access and paths which are physically separated from street parking lot traffic and that eliminate physical barriers such as walls, berms, landscaping and slopes that impede the use of pedestrians, bicycle facilities, or public transportation vehicles.
•All Project Applicants shall provide continuous sidewalks separated from the roadway by landscaping and on-street parking where provided, consistent with Section 3.1.1,
Roadway Design Standards, Section 3.2.1, Pedestrian
Mobility, and Figure 3-7 Bicycle Mobility Plan of the Menifee Valley Specific Plan.
•All Project Applicants shall link cul-de-sacs and dead-end streets to encourage pedestrian and bicycle travel.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 149
Menifee Mayor and City Council
February 7, 2024
Page
535 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 39
•All Project Applicants shall provide traffic reduction modifications to residential roads, such as: narrower streets, speed platforms, bulb-outs, and intersection modifications designed to reduce vehicle speeds and to encourage
pedestrian and bicycle travel.
•For all parking lots, Project Applicants shall provide a parking lot design that includes clearly marked and shaded
pedestrian pathways between transit facilities and building entrances.
•All Project Applicants shall provide pedestrian access between bus service and major transportation points and to destination points within the Project.
•For all high-density residential, mixed-use,
business/commercial park, and commercial uses, Project
Applicants shall provide a display case or kiosk displaying transportation information, such as bike route maps, bus schedules, and carpooling and car sharing in a prominent area accessible to employees, residents, or visitors.
•All Project Applicants shall design street block patterns consistent with the Menifee Valley Specific Plan and City of Menifee Standards and Ordinances.
•For all mixed-use, business/commercial park, and
commercial uses, Project Applicants shall provide
preferential parking spaces near the entrance of buildings for those who carpool/vanpool/rideshare and provide signage. •All Project Applicants shall improve the thermal
integrity/efficiency of buildings and reduce the thermal load with automated and timed temperature controls or occupant sensors.
•Project Applicants for manufacturing and light industrial uses that require refrigerated vehicles, shall install an adequate number of electrical service connections at loading docks for plugging in the anticipated number of refrigerated trailers to reduce idling time and emissions.
•Project Applicants for manufacturing and light industrial uses shall consider energy storage and combined heat and power in appropriate applications to optimize renewable energy generation systems and avoid peak energy use.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 150
Menifee Mayor and City Council
February 7, 2024
Page
536 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 40
•Project Applicants for manufacturing and light industrial uses with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with CARB Rule 2845 (13 California Code of Regulations [CCR] Chapter 10, Section 2485).
•Project Applicants shall install 240-volt electrical outlets or Level 3 chargers in parking lots that would enable charging of neighborhood electric vehicles (NEVs) and/or battery
powered vehicles.
•Project Applicants shall maximize use of solar energy
including solar panels, including installing the maximum possible number of solar energy arrays on the building roofs to generate solar energy.
•Project Applicants shall maximize the planting of trees in landscaping and parking lots, consistent with the Menifee Valley Specific Plan and City of Menifee Standards and
Ordinances.
•Project Applicants shall use light-colored paving and roofing materials.
•Project Applicants shall install outdoor electrical outlets to promote the use of electric lawn mowers and leaf blowers.
MM AIR-3Prior to issuance of building permits, Project Applicants/Developers shall provide plans that indicate a heating, ventilation, and air conditioning (HVAC) system with a control efficiency sufficient to result in a reduction of a minimum 89 percent of particulates of 10 microns or less, such as Minimum Efficiency Reporting Value (MERV)- 13 filters or greater, for indoor air filtration systems. The ventilation system shall be certified to achieve the stated performance effectiveness from indoor areas.
Supportive Evidence: Please refer to Draft EIR pages 4.3-39 through 4.3-47.
5.4 Biological Resources
Impact 4.4-1: Less than Significant with Mitigation Incorporated The Project site is located within the boundaries of the Western Riverside Multiple Species Habitat Conservation Plan (MSHCP) and is mapped within an MSHCP Burrowing Owl Survey Area. The habitat on the Project site has been altered due to agricultural operations and regular disking, therefore, a majority of the vegetation communities present on site are disturbed. Development of the proposed Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 151
Menifee Mayor and City Council
February 7, 2024
Page
537 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 41
project would result in permanent impacts to upland vegetation communities. Two special-status species were observed on the project site during the reconnaissance-level field surveys; however, impacts to these three species are considered less than significant. If construction is to begin during the bird breeding season (typically February 1 through August 31), impacts to nesting birds will be potentially significant due to nesting birds being protected under the MBTA and California Fish and Game Code. No burrowing owl or their sign were observed within the Project site during surveys.
Despite this, impacts to burrowing owl could be potentially significant due to potential for this species to occupy the site and its surrounding areas prior to development of the project, as well as the potential for future occupation of the site. The project is within the Stephens' Kangaroo Rat (SKR) Habitat Conservation Plan (HCP) area. Although there is very low potential for SKR to occur within the project site due to regular disking and disturbance of the site, project impacts to this species would be considered potentially significant. Impacts to special status species in the on-site, off-site, and off- site roadway improvement areas will be reduced to a less than significant level through application of Mitigation Measures MM BIO-1 through MM BIO-4.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with mitigation measures MM BIO-1 through MM BIO-4.
Mitigation Measures: Based upon the analysis presented in Section 4.4, Biological Resources of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
MM BIO-1:Prior to issuance of any building permits for non-residential uses and occupancy releases for residential uses, the applicant shall provide payment to the City of Menifee Community Development Department for applicable Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) Local Development Mitigation Fees. The Local Development Mitigation Fees are subject to change each fiscal year. As such, the Applicant shall pay the current fee amounts according to timing outlined by the Western Riverside County Regional Conservation Authority (RCA). The Applicant shall pay the current fee amounts regarding roadways prior to approval of the Improvement Plan. The Applicant shall pay the current fee amounts regarding residential, commercial and industrial uses, prior to building permit issuance.
MM BIO-2:Prior to issuance of any grading permits, the City of Menifee Community Development Department shall confirm that the construction plans indicate that vegetation, including suitable nesting habitat for birds, shall be removed outside the bird nesting season (February 15 through August 31). If vegetation cannot be removed outside the bird nesting season (February 15 through August 31), nesting bird surveys shall be conducted within 3 days prior to project ground disturbance or vegetation removal to ensure that nesting birds protected under the Migratory Bird Treaty Act (MBTA) and California Fish and Game Code are not disturbed by Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 152
Menifee Mayor and City Council
February 7, 2024
Page
538 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 42
construction-related activities (i.e., brush clearing and noise). If nesting birds are documented on or in the immediate vicinity (within approximately 300 feet) of the project site, no construction or clearing shall be conducted within an appropriate avoidance buffer surrounding the active nest(s), as determined by a qualified biologist, until the project biologist determines that the young have fledged or the nest is no longer active.
MM BIO-3:A qualified biologist shall conduct a pre-construction presence/absence survey for burrowing owls within 30 days prior to site disturbance. Proof of this pre-construction survey shall be provided for approval to the City of Menifee Community Development Department, prior to issuance of any grading permits. If burrowing owls are documented on site, the owls shall be relocated/excluded from the site outside of the breeding season following accepted protocols, as specified in MSHCP Section 6.3.2.
MM BIO-4:Prior to issuance of any grading permits, the City of Menifee Community Development Department shall confirm that the project applicant has paid the fees pursuant to Ordinance 663.10 for the Stephens’ kangaroo rat (SKR) Habitat Conservation Plan (HCP) Fee Assessment Area.
Supportive Evidence: Please refer to Draft EIR pages 4.4-27 through 4.4-35.
Impact 4.4-2: Less than Significant Impact with Mitigation Incorporated Biological surveys indicated the Project site is substantially disturbed but contains Riversidean Sage Scrub, Southern Willow Scrub – Disturbed, Mulefat Thickets, and Ephemeral Streambed – Disturbed.
The areas of ephemeral streambed are mostly unvegetated and are highly disturbed from agricultural uses. Additionally, two drainage features cross McCall Road within the limits of the off-site roadway improvements. Despite this, impacts on non-wetland and wetland waters of the State jurisdictional by the Regional water Quality Conti Board (RWQCB), and unvegetated streambed and associated wetland habitat jurisdictional by the California Department of Fish and Wildlife (CDFW) will be potentially significant as the project is expected to permanently impact these resources. Impacts to the MSHCP riparian/riverine areas in the on-site, off-site, and off-site roadway improvement areas will be reduced to a less than significant level through application of Mitigation Measure MM BIO-5.
Furthermore, the site lacks suitable riparian habitat for MSHCP riparian/riverine wildlife species, because MSHCP riparian/riverine areas are highly disturbed and isolated.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with Mitigation Measure MM BIO-5.
Mitigation Measures: Based upon the analysis presented in Section 4.4, Biological Resources of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 153
Menifee Mayor and City Council
February 7, 2024
Page
539 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 43
MM BIO-5:Prior to any ground-disturbing activity near jurisdictional features on-site, the project applicant shall provide proof to the City of Menifee Community Development Department that applicable permits have been obtained through the Regional Water Quality Control Board (RWQCB) and the California Department of Fish and Wildlife (CDFW) and that permit conditions/mitigation has been fully satisfied for impacts to jurisdictional features. Based on the results of the on-site jurisdictional delineation for the proposed project, the proposed project would permanently impact 1.93 acres of RWQCB jurisdictional nonwetland waters of the State and CDFW jurisdictional unvegetated streambed (i.e., Feature 1 and Feature 2), and 0.03 acre of RWQCB jurisdictional wetland waters of the State and CDFW-jurisdictional associated wetland habitat (i.e., Feature 2 Wetland). The proposed mitigation strategy for on-site impacts shall be the purchase of 2.94 acres of rehabilitation credits (1.5:1 mitigation ratio;
1.93 acres + 0.03 acre = 1.96 X 1.5 ratio = 2.94 acres of mitigation) from the Riverpark Mitigation Bank. Alternatively, on-site impacts shall be mitigated with the purchase of 3.92 acres of preservation credits (2:1 mitigation ratio; 1.93 acres + 0.03 acre = 1.96 X 2 ratio = 3.92 acres of mitigation) from the Barry Jones Skunk Hollow Preservation Bank. The project applicant shall mitigate direct impacts on an additional 0.25 acre of streambed Waters of the State (WOS)/MSHCP riverine features by purchasing an additional 0.38 acres of rehabilitation credits (1.5:1 mitigation ratio) at the Riverpark Mitigation Bank to satisfy anticipated CDFW 1602 and/or RWQCB mitigation requirements. The proposed project would permanently impact 0.17 acre (Feature 5) and 0.08 acre (Feature 4, Feature 6, Feature 7, Feature 8, and Feature 9) of Ephemeral Streambed – Disturbed, which are found in off-site roadway improvement areas. The
1.5:1 ratio of mitigation was previously approved by the Wildlife Agencies following the field visit via email correspondence (Appendix D-7). Alternatively, the project applicant can also offset the additional 0.25 acres of streambed Waters of the State (WOS)/MSHCP riverine features (Feature 4, Feature 5, Feature 6, Feature 7, Feature 8, Feature 9), which are found in off-site roadway improvement areas, by purchasing an additional 0.5 acres of preservation credits at Barry Jones Skunk Hollow or another CDFW-approved mitigation bank within Riverside County at a 2:1 mitigation ratio.
This option of mitigation shall also provide biologically equivalent or superior preservation. Notification of Streambed Alteration to CDFW shall be provided to justify the purchasing of credits and mitigation used for the Project Site. In total, the project applicant shall purchase 0.38 acres of rehabilitation credits or 0.5 acres of preservation credits. The proposed mitigation strategy for off-site roadway improvement area impacts shall be the purchase of 0.38 acre of rehabilitation credits (1.5:1 mitigation ratio; 0.17 acre + 0.08 acre = 0.25 acre X 1.5 ratio = 0.38 acre of mitigation) from the Riverpark Mitigation Bank. Alternatively, off-site roadway improvement area impacts shall be mitigated with the purchase of 0.50 acre of preservation credits (2:1 mitigation ratio; 0.17 acre + 0.08 acre = 0.25 acre X 2 ratio =
0.50 acre of mitigation) from the Barry Jones Skunk Hollow Preservation Bank.
The Applicant shall be obligated to implement/comply with the permit conditions and mitigation measures required by the resource agencies regarding impacts on their respective jurisdictions. The proposed mitigation strategy shall prioritize in-kind and Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 154
Menifee Mayor and City Council
February 7, 2024
Page
540 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 44
in-watershed options per the regulatory agencies’ preferences. The regulatory agencies shall make the final determination of the final compensatory mitigation requirements during the permit evaluation process.
Prior to any ground-disturbing activity near jurisdictional aquatic resources in off-site improvement areas, the project applicant shall provide proof to the City of Menifee Community Development Department that applicable permits have been obtained through the RWQCB and the CDFW for impacts on off-site jurisdictional aquatic resources. Based on the results of the off-site jurisdictional delineation for the proposed project, the proposed project would permanently impact 0.32 acre of vegetated streambed (i.e., Feature 1, Feature 3, Feature 3A, Feature 4, and Feature 4A). The proposed mitigation strategy for off-site impacts shall be the purchase of
0.48 acre of rehabilitation credits (1.5:1 mitigation ratio; 0.32 acre X 1.5 ratio = 0.48 acre of mitigation) from the Riverpark Mitigation Bank. Alternatively, off-site impacts shall be mitigated with the purchase of 0.64 acre of preservation credits (2:1 mitigation ratio; 0.32 acre X 2 ratio = 0.64 acre of mitigation) from the Barry Jones Skunk Hollow Preservation Bank. Additionally, the jurisdictional determination request forms shall be submitted to the United States Army Corps of Engineers (USACE) to confirm that no jurisdictional waters of the United States occur within the footprint of any off-site improvements. Should the USACE not agree with the findings of the request forms and determine that jurisdictional waters of the United States occur within the off-site improvements footprint (i.e., the USACE does not issue an AJD confirming that none of the features are USACE jurisdictional resources), applicable permits shall be obtained through the USACE for impacts on jurisdictional aquatic resources. The Applicant shall implement/comply with all permit conditions and mitigation measures required by the resource agencies. Compensatory mitigation to offset impacts on jurisdictional aquatic resources may be implemented through off-site, permittee-responsible mitigation; in-lieu fee program or mitigation bank credit purchase (e.g., Riverpark Mitigation Bank); or a combination of these options depending on availability. The proposed mitigation strategy shall prioritize in- kind and in-watershed options per the regulatory agencies’ preferences. The regulatory agencies shall make the final determination regarding compensatory mitigation requirements during the permit evaluation process. The proposed project will impact a total of 2.53 acres of aquatic resources for project site improvements, off-site improvements, and off-site roadway improvements. Total mitigation required shall be 3.8 acres of rehabilitation credits (1.5:1 mitigation ratio) from the Riverpark Mitigation Bank for project site improvements, off-site improvements, and off-site roadway improvements. Alternatively, project site improvements, off-site improvements, and off-site roadway improvements shall be mitigated with the purchase of 5.06 acres of preservation credits (2:1 mitigation ratio) from the Barry Jones Skunk Hollow Preservation Bank.
Supportive Evidence: Please refer to Draft EIR pages 4.4-35 through 4.4-41.
Impact 4.4-3: Less than Significant Impact with Mitigation Incorporated Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 155
Menifee Mayor and City Council
February 7, 2024
Page
541 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 45
The Project contains riparian/riverine habitat as defined in Section 6.1.2 of the MSHCP.
Implementation of the proposed project would impact non-wetland waters of the State and unvegetated streambed, and wetland waters of the State and associated wetland habitat. Impacts to RWQCB- and CDFW-jurisdictional aquatic resources would require Waste Discharge Requirements (WDRs) from the RWQCB and a Streambed Alteration Agreement (SAA) from the CDFW. Additionally, compensatory mitigation may be required by the regulatory agencies to offset the proposed project impacts. Impacts to expected toward RWQCB- and CDFW-jurisdictional aquatic resources in the on- site, off-site, and off-site roadway improvement areas will be reduced to a less than significant level through application of mitigation measure MM BIO-5.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with Mitigation Measure MM BIO-5.
Mitigation Measures: Based upon the analysis presented in Section 4.4, Biological Resources of the Draft EIR, which is incorporated herein by reference, Mitigation Measure MM BIO-5 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.4-41 through 4.4-47.
Impact 4.4-4: Less than Significant Impact with Mitigation Incorporated The Project site is not within an area identified by the MSHCP as an important migratory or native resident wildlife corridor area. No fish species occur at the Project site or within the wider biological study area (BSA). Potential habitat for nesting birds does exist in the area. Increases in noise, construction traffic, and human activities during construction activities may temporarily deter movement of wildlife within the project vicinity. However, significant impacts to wildlife corridors or nursery sites are not expected from construction or operational activities of the proposed project.
Impacts to potential nesting bird habitat in the on-site, off-site, and off-site roadway improvement areas will be reduced to a less than significant level through application of Mitigation Measure MM BIO-2.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with mitigation measure MM BIO-2.
Mitigation Measures: Based upon the analysis presented in Section 4.4, Biological Resources of the Draft EIR, which is incorporated herein by reference, Mitigation Measure MM BIO-2 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.4-47 through 4.4-49.
Impact 4.4-5: Less than Significant Impact with Mitigation Incorporated Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 156
Menifee Mayor and City Council
February 7, 2024
Page
542 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 46
The Project site lies within the MSHCP boundaries. The proposed Project as designed, with mitigation applied, would comply with all applicable policies and ordinances protecting biological resources.
With implementation of mitigation measures, impacts to burrowing owl at the Project site and jurisdictional waters would be less than significant. In addition, the proposed Project is subject to all applicable federal, State, and local policies and regulations related to the protection of biological resources and tree preservation. Additionally, the Project is required to comply with the Menifee Landscape Standards (Section 9.2 of the Municipal Code) and Section 9.205 of the City Municipal Code establishing Tree Preservation Ordinance. It was determined that no protected trees exist on the Project site; therefore, the Project will not be subject to the City of Menifee’s tree removal ordinance.
Implementation of the proposed Project would not conflict with any local policies or ordinances protecting biological resources. Implementation of mitigation measures MM BIO-1 through BIO-5 would ensure that the proposed Project would not conflict with or obstruct applicable policies and ordinances protecting biological resources in the on-site, off-site, and off-site roadway improvement areas.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with mitigation measures MM BIO-1 through BIO-5.
Mitigation Measures: Based upon the analysis presented in Section 4.4, Biological Resources of the Draft EIR, which is incorporated herein by reference, Mitigation Measures MM BIO-1 through BIO-5 are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.4-50 through 4.4-52.
Impact 4.4-6: Less than Significant Impact with Mitigation Incorporated The Project site lies within the MSHCP. The site is within MSHCP designated survey areas for burrowing owl and the burrowing owl has the potential to occur at the Project site and adjacent areas.
The Project site is not within an MSHCP designated amphibian or mammal survey area or CASSA for plants. The Project site is not within any MSHCP Criteria Cells, Cell Groups, Cores, or Linkages.
Implementation of Mitigation Measures MM BIO-1 through BIO-5 would ensure that the proposed Project would not conflict with or obstruct implementation of the MSHCP in the on-site, off-site, and off-site roadway improvement areas.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with mitigation measures MM BIO-1 through BIO-5.
Mitigation Measures: Based upon the analysis presented in Section 4.4, Biological Resources of the Draft EIR, which is incorporated herein by reference, Mitigation Measures MM BIO-1 through BIO-5 are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 157
Menifee Mayor and City Council
February 7, 2024
Page
543 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 47
Supportive Evidence: Please refer to Draft EIR pages 4.4-52 through 4.4-54.
5.5 Cultural Resources
Impact 4.5-1 and 4.5-2: Less than Significant Impact with Mitigation Incorporated Cultural resource assessments from 2019 and 2022 found no historical resources pursuant to Section 15064.5 of the State CEQA Guidelines on the Project site. The assessments found two prehistoric archaeological resources on the Project site (CA-RIV-3429 and CA-RIV-12345). CA -RIV-3429 does not meet any of the four criteria for listing on the NRHP or CRHR. CA-RIV-12345 is not associated with events that have made a significant contribution to the broad patterns of history and therefore is not recommended as eligible to the NRHP/CRHR.
The project as represented in the Specific Plan has been designed to avoid the cultural resources CA- RIV-12345 and CA-RIV-3429, and therefore, there is no potential for encountering any known archaeological materials and/or historical resources. RCM CUL-1, RCM CUL-2, and RCM CUL-3 have been identified to reduce impacts to archaeological resources that may inadvertently be found during construction activities. RCM TCR-1, RCM TCR-2, RCM TCR-3, and RCM TCR-4 which are listed under Section 4.18 in the Draft EIR, Tribal Cultural Resources, have also been identified to reduce impacts to tribal cultural resources that may inadvertently be found during construction activities.
A supplemental assessment of the potential cultural resource impacts to off-site areas was prepared for the proposed project, in which three historic period cultural resources were identified. Two of these resources, Menifee Road and Briggs Road, were evaluated for listing on the California Register, and neither resource meets the criteria for listing. The third cultural resource, a 590-foot-long segment of the San Jacinto Railroad starting at Matthews Road and extending southeast, has been previously determined eligible for listing on the California Register under Criterion 1. The portion of the railroad within the proposed off-site improvement area retains sufficient integrity to convey its significance, and thus, must be avoided by project construction activities. The proposed pedestrian bridge would cross over the railroad and would not physically impact the railroad or result in significant impacts to the railroad. However, to ensure that impacts remain less than significant mitigation measure MM CUL-1 is proposed. With implementation of MM CUL-1, impacts would be less than significant. The supplemental cultural resource study identified no archaeological resources within the off-site improvement areas.
The supplemental cultural resource study for the off-site roadway improvement areas along Matthews Road (Case Road), McCall Boulevard, and McLaughlin Road identified no cultural resources.
A prehistoric lithic scatter and a historic railway are mapped adjacent to the off-site improvement areas along McCall Boulevard and Matthews Road, respectively. However, the survey of these areas found no evidence that cultural materials associated with the resources extended into the proposed off-site improvement areas. As such, Project activities within the proposed off-site improvement areas are not expected to impact these identified cultural resources.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 158
Menifee Mayor and City Council
February 7, 2024
Page
544 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 48
significance with regulatory compliance measures RCM CUL-1 through CUL-3, RCM TRC-1 through TRC-4, and mitigation measure MM CUL-1.
Mitigation Measures: Based upon the analysis presented in Section 4.5, Cultural Resources of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure MM CUL-1 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
MM CUL-1Prior to the construction of any bridge structure over the existing San Jacinto Valley Railroad, the developer shall submit evidence to the City for review and approval that any such construction activity avoids physical impacts to the existing rail feature.
Furthermore, prior to any bridge construction, the developer shall submit to the City for review and approval plans detailing (but not limited to) the location, orientation, design, and/or materials proposed for any bridge construction to ensure bridge features to not adversely affect the integrity of the existing rail feature.
Supportive Evidence: Please refer to Draft EIR pages 4.5-9 through 4.5-16.
5.6 Energy
No impacts were concluded to be potentially significant.
5.7 Geology and Soils
Impact 4.7-6: Less than Significant Impact with Mitigation Incorporated A record search and field studies performed for the proposed Project indicated that no fossil localities are known from within the Project site, Project area, or within 1 mile of the Project’s boundaries.
However, just outside the 1-mile boundary of the Project site, hundreds of fossil localities associated with the Diamond Valley Lake Project were documented. Given the underlying soils within the off-site improvement areas and results of the fossil locality record search, the off-site improvement areas are considered to have a low to high paleontological sensitivity. According to the City of Menifee General Plan EIR, the Project site is located within a high sensitivity area for paleontological resources. 1 As excavation for construction gets under way, it is possible that unanticipated paleontological resources might be encountered at depths between 4 feet and 10 feet below ground surface, and possibly beyond. Implementation of mitigation measures MM GEO-1 through GEO-3 would ensure potential impacts to scientifically significant, nonrenewable paleontological resources would be reduced to less than significant. Although there are no known paleontological resources within the Project site, the paleontological resource studies conducted for the Project site and off-site improvement areas concluded there is potential to inadvertently uncover paleontological resources during construction activities. RCM CUL-1 through CUL-3 would be implemented to reduce impacts to paleontological resources that may inadvertently be found during construction activities.
Finding: The City adopts CEQA Finding 1.
1 City of Menifee. City of Menifee General Plan Draft Environmental Impact Report. State Clearinghouse #2012071033. Section 5 Environmental Analysis Cultural Resources. Figure 5.5-1. Paleontological Resources Sensitivity and Page 5.5-12. September 2013.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 159
Menifee Mayor and City Council
February 7, 2024
Page
545 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 49
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with regulatory compliance measures RCM CUL-1 through RCM CUL-3 and mitigation measures MM GEO-1 through GEO-3.
Mitigation Measures: Based upon the analysis presented in Section 4.7, Geology and Soils of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
MM GEO-1Prior to the start of construction, all field personnel shall be briefed regarding the types of fossils that could be found in the Project area and the procedures to follow should paleontological resources be encountered. This training shall be accomplished at the pre-grade kickoff meeting or morning tailboard meeting and shall be conducted by the Project Paleontologist or his/her representative. Specifically, the training shall provide a description of the fossil resources that may be encountered in the Project area, outline steps to follow in the event that a fossil discovery is made and provide contact information for the Project Paleontologist and on-site monitor(s). The training shall be developed by the Project Paleontologist and may be conducted concurrently with other environmental training (cultural and natural resources awareness training, safety training, etc.).
MM GEO-2Prior to the commencement of ground-disturbing activities, a qualified professional paleontologist shall be retained to prepare and implement a Paleontological Resource Impact Mitigation Program (PRIMP) for the Project. Initially, full-time monitoring is recommended for grading and excavation activities 4 feet below ground surface that will disturb previously undisturbed Quaternary older alluvium (Qof) and very old fan deposits (Qvof). Due to soil development and previous agricultural disturbances, monitoring shall not be required in Project areas where construction activities disturb native sediments at depths less than 4 feet below ground surface. Spot-checking may occur in previously undisturbed young alluvial deposits (Qya) in order to determine if Project activities are impacting the underlying highly sensitive Pleistocene units.
Monitoring shall not be required in Project areas underlain by geologic units with no paleontological resource potential (i.e., the granodiorite to tonalite, Kdvg).
Monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that a paleontological resource is discovered, the monitor shall have the authority to divert temporarily the construction equipment around the find until it is assessed for scientific significance and collected. In areas of high sensitivity, monitoring efforts can be reduced or eliminated at the discretion of the Project Paleontologist if no fossil resources are encountered after 50 percent of the excavations are completed.
MM GEO-3Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laboratory to a point ready for curation. Preparation shall include the careful removal of excess matrix from fossil materials and stabilizing Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 160
Menifee Mayor and City Council
February 7, 2024
Page
546 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 50
and repairing specimens, as necessary. Following laboratory work, all fossil specimens shall be identified to the lowest taxonomic level, cataloged, analyzed, and delivered to the Western Science Center for permanent curation and storage. The cost of curation is assessed by the repository and is the responsibility of the Project owner.
At the conclusion of laboratory work and museum curation, a final report shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the Project area geology and paleontology, a list of taxa recovered (if any), an analysis of fossils recovered (if any) and their scientific significance, and recommendations. If the monitoring efforts produced fossils, then a copy of the report shall also be submitted to the Western Science Center.
Supportive Evidence: Please refer to Draft EIR pages 4.7-28 through 4.7-34
5.8 Greenhouse Gas Emissions
Impact 4.8-1 was concluded to be significant and unavoidable.
Impact 4.8-2 was concluded to be less than significant.
5.9 Hazards and Hazardous Materials
Impact 4.9-3: Less than Significant Impact with Mitigation Incorporated Both Heritage High School and Planning Area 6 (potential elementary school site) are adjacent to or within proximity to future uses and off-site improvement areas that may emit hazardous emissions during construction and/or operation. Construction of the on-site improvements would not result in a significant construction health risk impact to schools but operations would exceed SCAQMD significance thresholds, particularly for maximum cancer risk. Construction of off-site improvements along SR-74 and Briggs Road and off-site roadway improvements may involve emissions and handling of hazardous materials, substances, and waste typical of construction activities. Additionally, the off- site improvements and off-site roadway improvements would not be significant sources of long-term operational emissions. Implementation of MM AIR-1 (CARB diesel-engine requirements) would reduce substantial pollutant concentrations during project construction. MM AIR-2 and MM AIR-3 would be implemented to reduce substantial pollutant concentrations during project operation to reduce hazardous emissions to achieve compliance with SCAQMD health risk thresholds. Additionally, implementation of RCM HAZ-1 and RCMs WQ-1 though WQ-4 are required to comply with the waste discharge permit requirements to ensure construction contractors maintain equipment and supplies on site for containing and cleaning up hazardous materials spills and would train workers to deal with containment and cleanup.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with regulatory compliance measures RCM HAZ-1 and RCM WQ-1 through RCM WQ-4, and Mitigation Measures MM AIR-1 through AIR-3.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 161
Menifee Mayor and City Council
February 7, 2024
Page
547 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 51
Mitigation Measures: Based upon the analysis presented in Section 4.9, Hazards and Hazardous Materials of the Draft EIR, which is incorporated herein by reference, Mitigation Measures MM AIR-1 through MM AIR-3 are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.9-17 through 4.9-20.
Impact 4.9-4: Less than Significant Impact with Mitigation Incorporated The government records database search, completed as part of the offsite Phase I ESA determined that the on-site, off-site, and off-site roadway improvement areas are not included on any queried database compiled pursuant to Government Code Section 65962.5 that could create a significant hazard to the public or the environment. The Phase I ESA identified several listings for adjacent or nearby properties on databases potentially indicative of a contamination concern. One listing, the Arco Station 1212 located at 27181 McCall Boulevard approximately 20 feet south of the off-site improvement area along McCall Boulevard, was determined to represent a REC in connection with the off-site roadway improvement area. Implementation of mitigation measure MM HAZ-1 would ensure that a Soil Management Plan (SMP) be developed in order to properly dispose of any contaminated soil uncovered during earthwork operations. Implementation of MM HAZ-1 would ensure potential impacts are less than significant.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with mitigation measure MM HAZ-1.
Mitigation Measures: Based upon the analysis presented in Section 4.9, Hazards and Hazardous Materials of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.
MM HAZ-1 Soil Management Plan. The Applicant shall develop and implement a Soil Management Plan (SMP) to the satisfaction of the Director of Public Works, or designee, prior to the commencement of any ground disturbing or earthwork activities associated with the construction of off-site roadway improvements along McCall Boulevard.
Supportive Evidence: Please refer to Draft EIR pages 4.9-20 through 4.9-22.
Impact 4.9-5: Less than Significant Impact with Mitigation Incorporated The Project site is within Zone E of MARB’s Airport Land Use Compatibility Plan (ALUCP). The Riverside County ALUC provided an approval letter, which found the proposed project consistent with the 2014 MARB ALUP, subject to conditions as described in mitigation measure MM HAZ-2. Implementation of mitigation measure MM HAZ-2 would ensure that on-site, off-site, and off-site roadway improvements would have a less than significant impact on an airport land use plan and would not result in a safety hazard for people residing or working in the project area.
Finding: The City adopts CEQA Finding 1.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 162
Menifee Mayor and City Council
February 7, 2024
Page
548 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 52
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with Mitigation Measure MM HAZ-1.
Mitigation Measures: Based upon the analysis presented in Section 4.9, Hazards and Hazardous Materials of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
MM HAZ-2 Riverside County ALUC Condition of Approval. Prior to commencement of any construction activities, the project applicant shall provide proof to the City of Menifee Community Development Director, or designee, of compliance with the following ALUC conditions as included in their approval letter dated November 16, 2022:2 •Outdoor Lighting. Any new outdoor lighting that is installed shall be hooded or shielded so as to prevent either the spillage of lumens or reflection into the sky. Outdoor lighting shall be downward facing. Installation of future rooftop solar panels will require solar glare studies and ALUC review. •Prohibition of Certain Uses/Activities:
oAny use which would direct a steady light or flashing light of red, white, green, or amber colors associated with airport operations toward an aircraft engaged in initial takeoff or final landing procedure other than an FAA-approved navigational signal light or visual approach slope indicator;
oAny use which would cause sunlight to be reflected towards an aircraft engaged in initial takeoff or final landing procedure towards an airport;
oAny use which would generate smoke or water vapor or which would attract large concentrations of birds, or which may otherwise affect safe air navigation within the area;
oAny use which would generate electrical interference that may be detrimental to the operation of aircraft and/or aircraft instrumentation;
oHighly noise-sensitive outdoor nonresidential uses; and 2 Riverside County Airport Land Use Commission. November 16, 2022. RE: Airport Land Use Commission (ALUC) Development Review-Director’s Determination.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 163
Menifee Mayor and City Council
February 7, 2024
Page
549 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 53
oAny use which results in a hazard to flight, including physical (tall objects), visual, and electronic forms of interference with the safety of aircraft operations.
•“Notice of Airport in Vicinity”: A “Notice of Airport in Vicinity” (attached to the ALUC approval letter, Appendix H-4) shall be provided to all prospective purchasers and occupants of the property.
•Stormwater Basins: Any proposed stormwater basins or facilities shall be designed and maintained to provide for a maximum 48-hour detention following the design storm, and remain totally dry between rainfalls.
Vegetation in and around the stormwater basins that would provide food or cover for birds would be incompatible with airport operations and shall not be utilized in project landscaping. Trees shall be spaced so as to prevent large expanses of contiguous canopy, when mature. Landscaping in and around the stormwater basins shall not include trees or shrubs that produce seeds, fruits, or berries.
Landscaping in the stormwater basin, if not rip-rap, should be in accordance with the guidance provided in ALUC “Landscaping Near Airports” brochure, and the “Airports, Wildlife, and Stormwater Management” brochure available at RCALUC.org, which list acceptable plants from the Riverside County Landscaping Guide or other alternative landscaping as may be recommended by a qualified wildlife hazard biologist.
A notice sign (attached to the ALUC approval letter, Appendix H-4) shall be permanently affixed to the stormwater basin with the following language:
“There is an airport nearby. This stormwater basin is designed to hold stormwater for only 48 hours and not attract birds. Proper maintenance is necessary to avoid bird strikes.” The sign will also include the name, telephone number or other contact information of the person or entity responsible to monitor the stormwater basin.
Supportive Evidence: Please refer to Draft EIR pages 4.9-22 through 4.9-25
5.10 Hydrology and Water Quality
Impact 4.10-1: Less than Significant with Mitigation Incorporated During soil-disturbing construction activities, excavated soil would be exposed and there would be an increased potential for soil erosion and sedimentation compared to existing conditions. Pollutants of concern could have a detrimental effect on groundwater, on-site surface water, and off-site downstream receiving waters. Groundwater dewatering activities could affect surface water quality through the discharge of polluted groundwater to surface water bodies. Operation of the project also has the potential to produce pollutants of concern that may pollute runoff. Construction and operation have the potential to effect water quality in the on-site, off-site, and off-site roadway improvement areas. The project would comply with existing NPDES regulations (as specified in RCM Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 164
Menifee Mayor and City Council
February 7, 2024
Page
550 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 54
WQ-1, RCM WQ-2, and RCM WQ-3), which include preparation of a SWPPP and Erosion Control Plan, implementation of Construction BMPs to target and reduce pollutants of concern in storm water runoff and compliance with all applicable provisions in the Groundwater Discharge Permit.
Operational activities on site would be required to comply with the requirements of the MS4 Permit, including preparation of a Final WQMP and incorporation of operational BMPs to target pollutants of concern (as specified in RCM WQ-4). Additionally, the proposed bioretention and detention basins would be subject to conditions imposed by the Riverside County Airport Land Use Commission (ALUC).
ALUC requires stormwater basins to be designed and maintained to provide for a maximum 48-hour drawdown following the design storm and remain totally dry between rainfalls as detailed in MM HAZ-2. With implementation of regulatory compliance measures RCM WQ-1 through WQ-4 and Mitigation Measure MM HAZ-2, impacts related to a violation of any water quality standards or waste discharge requirements or degradation of surface or groundwater water quality during Project operation would be less than significant.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with regulatory compliance measures RCM WQ-1 through WQ-4 and Mitigation Measure MM HAZ-2.
Mitigation Measures: Based upon the analysis presented in Section 4.10, Hydrology and Water Quality of the Draft EIR, which is incorporated herein by reference, Mitigation Measure MM HAZ-2 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.10-27 through 4.10-38.
Impact 4.10-3 (i through iv): Less than Significant with Mitigation Incorporated During Project construction activities, soil would be exposed and disturbed, and drainage patterns would be temporarily altered during grading and other construction activities. Therefore, there would be an increased potential for soil erosion and siltation compared to existing conditions. A SWPPP (RCM WQ-1) and Erosion Control Plan (RCM WQ-2) would be prepared to minimize erosion and retain sediment on site. The proposed Project would increase impervious area on the Project site, which would result in a net increase in storm water runoff that can lead to downstream erosion in receiving waters. The proposed bioretention and detention basins would be subject to conditions imposed by the ALUC and mitigation measure MM HAZ-2. With implementation of RCM WQ-4, which requires the proposed Project to comply with hydromodification requirements, and RCM WQ-5, which requires the preparation of a Final Hydrology and Hydraulic Analyses that provides BMPs and Low Impact Developments (LIDs), operation impacts related to substantial on- or off-site erosion or siltation would be less than significant.
Implementation of the proposed Project would alter the on-site drainage pattern when compared to existing conditions. With implementation of RCM WQ-4 and RCM WQ-5 as well as MM HAZ-2, impacts related to an increase in the rate or amount of surface runoff in a manner that would result in on- or off-site flooding and impacts related to creation or contribution of storm water runoff that Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 165
Menifee Mayor and City Council
February 7, 2024
Page
551 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 55
would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff would be less than significant.
Construction of the proposed off-site improvements would also include implementation of RCM WQ- 1 and RCM WQ-2 to ensure that construction impacts related to (1) on- or off-site erosion or siltation; (2) a substantial increase in the rate or amount of surface runoff that would result in flooding and impede or redirect flood waters; or (3) creation or contribution of runoff water that would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff would be less than significant.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with regulatory compliance measures RCM WQ-1 through RCM WQ-5 and Mitigation Measure MM HAZ-2.
Mitigation Measures: Based upon the analysis presented in Section 4.10, Hydrology and Water Quality of the Draft EIR, which is incorporated herein by reference, Mitigation Measure MM HAZ-2 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.10-41 through 4.10-47.
Impact 4.10-4: Less than Significant with Mitigation Incorporated The Project site, as well as off-site and off-site roadway improvement areas, are not located in a tsunami hazard zone and are not susceptible to impacts associated with a seiche. The proposed project would not result in the release of pollutants due to inundation caused by dam failure.
According to FEMA maps, portions of the northeastern, central, and southwestern areas of the Project site are located in Flood Hazard Zone X. Although small portions in the center of the Project site are within Flood Hazard Zone A, which includes areas located within the 100-year floodplain subject to inundation by the 1-percent-annual-chance flood event, the proposed structures would be constructed so they are located above the 100-year floodplain and would be required to obtain a CLOMR from FEMA. During construction, BMPs would be implemented to ensure that during a rain event, pollutants would be retained on site and be prevented from reaching downstream receiving waters in accordance with RCM WQ-1 and WQ-2. During operations, the Project would include seven bioretention basins pursuant to RCM WQ-4 that would result in a reduction to post-project flow rates to less than pre-project flows under all the hydrological conditions evaluated. Operational activities associated with the proposed off-site improvements would be required to comply with the requirements of the MS4 Permit (RCM WQ-4). In addition, the proposed bioretention and detention basins would be subject to conditions imposed by the ALUC and MM HAZ-2.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 166
Menifee Mayor and City Council
February 7, 2024
Page
552 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 56
significance with regulatory compliance measures RCM WQ-1, RCM WQ-2, and RCM WQ-4 and Mitigation Measure MM HAZ-2.
Mitigation Measures: Based upon the analysis presented in Section 4.10, Hydrology and Water Quality of the Draft EIR, which is incorporated herein by reference, Mitigation Measure MM HAZ-2 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.9-47 through 4.9-50.
Impact 4.10-5: Less than Significant with Mitigation Incorporated The proposed Project would comply with the Santa Ana Region MS4 Permit requirements and would implement construction and operational BMPs to reduce pollutants of concern in storm water runoff (RCM WQ-1 through RCM WQ-4). Additionally, the proposed bioretention and detention basins would be subject to conditions imposed by the ALUC and MM HAZ-2. As such, the proposed Project would not result in water quality impacts that would conflict with the Santa Ana RWQCB Santa Ana River Water Quality Control Plan (Basin Plan). The Project site is in the San Jacinto Groundwater Basin, which is designated as a high priority basin. Groundwater dewatering activities could affect surface water quality through the discharge of polluted groundwater to surface water bodies. As specified in RCM WQ-3, groundwater dewatering activities would comply with the Waste Discharge Requirements (WDR) Permit ensure that construction impacts related to a decrease in groundwater supplies or interference with groundwater recharge in a manner that may impede sustainable groundwater management would be less than significant. There are adequate water supplies from groundwater sources during normal, dry year, and multiple dry year demands to serve the proposed Project’s needs. The increase in impervious surface areas would not substantially decrease infiltration compared to existing conditions and the proposed Project would be designed to collect storm water flows and contribute to infiltration to the groundwater basin at Lake Elsinore. The proposed Project would not conflict with or obstruct the implementation of a sustainable groundwater management plan. Implementation of RCM WQ-1 through RCM WQ-4 and MM HAZ-2 would ensure that the proposed project would not conflict with a water quality control plan or groundwater management plan.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with regulatory compliance measures RCM WQ-1 through RCM WQ-4 and Mitigation Measure MM HAZ-2.
Mitigation Measures: Based upon the analysis presented in Section 4.10, Hydrology and Water Quality of the Draft EIR, which is incorporated herein by reference, Mitigation Measure MM HAZ-2 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Supportive Evidence: Please refer to Draft EIR pages 4.10-50 through 4.10-54
5.11 Land Use and Planning
Impact 4.11-1 was concluded to be less than significant.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 167
Menifee Mayor and City Council
February 7, 2024
Page
553 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 57
Impact 4.11-2 was concluded to be significant and unavoidable.
5.12 Mineral Resources
No impacts were concluded to be significant.
5.13 Noise
Impact 4.13-2: Less than Significant with Mitigation Incorporated The closest residential, utility, and school buildings would not experience vibration exceeding the FTA’s community annoyance thresholds or vibration damage thresholds. Other building structures that surround the Project site would experience lower vibration levels because they are farther away and would be constructed equivalent to or better than non-engineered timber and masonry. Once operational, the proposed Project would not generate vibration. Construction equipment expected to be used for off-site roadway and infrastructure improvements would not generate vibration except for loaded trucks and bulldozers. The closest residential buildings along Menifee Road north of SR-74 are approximately 10 feet from loaded trucks at the Project construction boundary for off-site roadway and infrastructure improvements, would experience vibration exceeding the FTA’s community annoyance threshold of 78 VdB for daytime residences. The implementation of mitigation measure MM N-1 would reduce construction vibration levels from off-site roadway and infrastructure improvements.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with Mitigation Measure MM N-1.
Mitigation Measures: Based upon the analysis presented in Section 4.13, Noise and Vibration of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
MM N-1: Prior to issuance of grading or building permits, the City of Menifee shall confirm that construction specifications indicate that the construction contractor shall restrict loaded trucks or require the use of light pick-up trucks within 15 feet of the residential structures along Menifee Road north of State Route 74 (SR-74). In addition, the City of Menifee shall confirm that construction specifications indicate that the construction contractor shall restrict large bulldozers and loaded trucks or require the use of small rubber-tired bulldozers and light pick-up trucks within 15 feet of the residential structures along McCall Boulevard between Durant Street and Junipero Road.
Supportive Evidence: Please refer to Draft EIR pages 4.13-54 through 4.13-59.
5.14 Population and Housing
No impacts were concluded to be significant.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 168
Menifee Mayor and City Council
February 7, 2024
Page
554 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 58
5.15 Public Services
No impacts were concluded to be significant.
5.16 Recreation
No impacts were concluded to be significant.
5.17 Transportation
Impacts 4.17-1 and 4.17-2 were concluded to be significant and unavoidable.
Impacts 4.17-3 and 4.17-5 were concluded to be less than significant.
5.18 Tribal Cultural Resources
Impact 4.18-1(i): Less than Significant with Mitigation Incorporated An updated review of the sacred Lands File (SLF) conducted by the Native American Heritage Commission (NAHC) was completed with negative results. The Tribal Historic Preservation Office noted that previous surveys in the area had been positive for cultural resources and several other tribes noted that the project location and adjacent areas are considered sensitive to the tribes.
Although the proposed project would not cause a substantial adverse change in the significance of a known tribal cultural resource, regulatory compliance measures are required for the proposed project. RCM TCR-1 through TCR-4 would be implemented to reduce impacts to tribal cultural resources that may inadvertently be found during construction activities. RCM CUL-1 through CUL-3 would also be implemented to reduce impacts to archaeological resources that may inadvertently be found during construction activities.
A supplemental cultural resources study was completed in which three historic period cultural resources were identified. Two of these resources did not meet the criteria for listing on the California Register. The third cultural resource, a 590-foot-long segment of the San Jacinto Railroad starting at Matthews Road and extending southeast, has been previously determined eligible for listing on the California Register under Criterion 1. The portion of the railroad within the proposed off-site improvement area retains sufficient integrity to convey its significance, and thus, must be avoided by project construction activities. The proposed pedestrian bridge would cross over the railroad and would not physically impact the railroad or result in significant impacts to the railroad. However, to ensure that impacts to the sites remain less than significant, Mitigation Measures MM TRC-1, MM TRC-2, and MM CUL-1 would be implemented.
Finding: The City adopts CEQA Finding 1.
Pursuant to Public Resources Code Section 21081(a) and State CEQA Guidelines Section 15091(a), the City hereby finds that changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect on the environment to below a level of significance with regulatory compliance measures RCM TRC-1 through TRC-4 and RCM CUL-1 through CUL-3, and Mitigation Measures MM CUL-1, MM TRC-1 and MMTRC-2.
Mitigation Measures: Based upon the analysis presented in Section 4.13, Noise and Vibration of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 169
Menifee Mayor and City Council
February 7, 2024
Page
555 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 59
MM TCR-1: Cultural Resource ESA Fencing. Prior to any ground disturbing activities of the area that encompasses CA-RIV-3249, the Project Archaeologist and Tribal monitors shall ensure that appropriate temporary fencing is installed (i.e., orange fabric/barrier fencing) around the resource to prevent any unintentional disturbances during ground disturbing activities on the Project site. The fencing will be installed before clearing and grubbing and will not be removed until all earthmoving activities within the immediate vicinity of the resource have been completed. The Project Archaeologist and Pechanga Tribal monitor will be on site to monitor the fence installation and removal and will conduct daily inspections of the fencing to make sure that it is intact and has not been breached.
MM TCR-2: Relocation and Reburial of CA-RIV-12345. Prior to ground disturbance of the area that encompasses CA-RIV-12345, the Project Archaeologist and Tribal Monitors shall identify and collect elements of the site for reburial in open space. It is anticipated that reburial can occur within the Project’s designated open space; however, given that there is an existing cultural resource site within the open space, the reburial location shall be reviewed by the Tribe to confirm it is located outside of the existing site boundary.
Supportive Evidence: Please refer to Draft EIR pages 4.18-5 through 4.18-15.
5.19 Utilities and Service Systems
No impacts were concluded to be significant.
5.20 Wildfire
No impacts were concluded to be significant.
6.0 FINDINGS REGARDING SIGNIFICANT AND UNAVOIDABLE ENVIRONMENTAL
IMPACTS WHICH CANNOT BE MITIGATED TO A LEVEL OF LESS THAN SIGNIFICANT
6.1 Aesthetics
No impacts were concluded to be significant and unavoidable.
6.2 Agriculture and Forestry Resources
No impacts were concluded to be and significant and unavoidable.
6.3 Air Quality
Impact 4.3-1: Significant and Unavoidable Impact
Per the South Coast Air Quality Management District (SCAQMD) CEQA Air Quality Handbook, there are two main indicators of a project’s consistency with the Air Quality Management Plan (AQMP).
Because the Project would create a new Specific Plan with provisions for the development of up to 1,718 units housing up to approximately 5,220 persons, as already considered in SP 301, it would not result in any unplanned population growth, and would serve to improve the City’s housing-jobs balance. As such, the Project would be consistent with AQMP Indicator 2, which pertains to whether the Project would exceed the assumptions in the AQMP. However, the Project would be inconsistent with AQMP Indicator 1, which pertains to increased or new air quality violations as well as delayed Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 170
Menifee Mayor and City Council
February 7, 2024
Page
556 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 60
attainment of Ambient Air Quality Standards (AAQS) or emission reductions. This inconsistency would be due to the project’s significant and unavoidable long-term operational pollutant emissions, as discussed further under Threshold 4.3-2. The Project would implement mitigation measures pertaining to future development (MM AIR-1 and MM AIR-2), but even with the implementation, the inconsistency with AQMP Indicator 1 would remain. Roadway improvements are consistent with the City’s planned roadway network and would not result in indirect unplanned growth within the city.
The proposed roadway improvements and utility connections would not include housing or employment growth that would exceed growth assumptions in the SCAG’s RTP/SCS or the AQMP, and impacts to air quality would therefore be less than significant.
Mitigation Measures: Based upon the analysis presented in Section 4.3, Air Quality, of the Draft EIR, which is incorporated herein by reference, Mitigation Measures MM AIR-1 and MM AIR-2, listed below under Impact 4.3-2, are feasible and are made binding through the MMRP. Imposition of these mitigation measures will not reduce potentially significant impacts to less than significant. As such, the impact remains significant and unavoidable.
Supportive Evidence: Please refer to Draft EIR pages 4.3-21 through 4.3-25.
Impact 4.3-2: Significant and Unavoidable Impact
The maximum daily emissions of most pollutants that would result from construction of the on-site improvements would not exceed the SCAQMD regional significance thresholds; however, NO x emissions would exceed SCAQMD thresholds. Therefore, MM AIR-1 was identified, which would reduce construction emissions to a less than significant level. Buildout of the proposed Project would generate a total of approximately 60,570 average daily trips. In addition, CalEEMod assumes that the proposed Project would utilize contemporary energy-efficient technologies and operational programs. Operational emissions associated with implementation of the proposed Project would not exceed the SCAQMD’s threshold for SOx; however, emissions of VOCs, NOx, CO, PM10, and PM2.5 would exceed SCAQMD thresholds. Since operational emissions would exceed SCAQMD thresholds, it is assumed that combined emissions with other projects in the vicinity would also exceed the significance threshold established by the SCAQMD for daily project emissions. MM AIR-2, which would require the implementation of all feasible measures to reduce operational impacts associated with the proposed Project, was identified. MM TRA-1, identified in Draft EIR Section 4.17, Transportation, was identified to further reduce impacts pertaining to emissions. However, without quantification to guarantee a less than significant finding, future development projects may still exceed the SCAQMD regional significance thresholds. As such, on-site operational emissions would be considered significant and unavoidable.
Project construction and operational emissions associated with the off-site improvements would be minimal and would not exceed the SCAQMD emissions thresholds. However, when these emissions are combined with the on-site construction and operational emissions, emissions would exceed SCAQMD’s thresholds. Mitigation Measures were identified in this analysis (MM AIR-1 and MM AIR- 2) that would require the implementation of all feasible measures to reduce construction and operational impacts associated with the proposed project. Incorporation of MM AIR-1 would ensure that the short-term construction emissions improvements would not exceed the SCAQMD’s thresholds. MM TRA-1, identified in Draft EIR Section 4.17, Transportation, would further reduce Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 171
Menifee Mayor and City Council
February 7, 2024
Page
557 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 61
impacts; however, the emission reduction associated with some operational measures, including those that would reduce Project-related VMT, cannot be quantified. Without quantification to guarantee a less than significant finding, operations of future development projects may still exceed the SCAQMD regional significance thresholds. Therefore, off-site operational emissions would be considered significant and unavoidable.
Mitigation Measures: Based upon the analysis presented in Section 4.3, Air Quality, of the Draft EIR, which is incorporated herein by reference, Mitigation Measures MM AIR-1 and MM AIR-2, listed below, are feasible and are made binding through the MMRP. Additionally, MM TRA-1, identified in Section 4.17, Transportation, of the Draft EIR, would also apply. Imposition of these mitigation measures will not reduce potentially significant impacts to less than significant. As such, the impact remains significant and unavoidable.
MM AIR-1 During construction of the on-site improvements associated with the proposed Project, the Project contractor shall ensure all 50 horsepower or more off-road diesel- powered construction equipment is powered with California Air Resources Board (CARB)-certified Tier 4 Final engines or the equivalent, except where the Project Applicant establishes to the satisfaction of the City of Menifee (City) that Tier 4 Final equipment is not available. An exemption from these requirements may be granted by the City if the City documents that equipment with the required tier is not reasonably available within Southern California and corresponding reductions in criteria air pollutant emissions are achieved from other construction equipment to the extent feasible.
MM AIR-2 Prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the following emission reduction measures. Implementation of the following measures is considered to be applicable, feasible, and effective in reducing criteria pollutant emissions generated by the Project:
•All Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, construction equipment, and generators).
•For high density and mixed-use developments, Project Applicants shall consult with the local transit agency and incorporate all appropriate and feasible transit amenities into the plans, consistent with Section 3.1.4 Bus Rail and Transit Options in the Menifee Valley Specific Plan. •All Project Applicants shall implement walkable neighborhoods by siting parks and community centers near residential areas consistent with Section 2 Land Use Designations and Planning Areas in the Menifee Valley Specific Plan.
•All Project Applicants shall incorporate fuel-efficient heating equipment and other appliances, such as water heaters, swimming pool heaters, cooking Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 172
Menifee Mayor and City Council
February 7, 2024
Page
558 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 62
equipment, refrigerators, furnaces, boiler units, and low or zero-emitting architectural coatings. Project Applicants shall utilize only Energy Star heating, cooling, and lighting devices, and appliances, consistent with CALGreen requirements applicable at time of development applications. •All Project Applicants shall utilize energy-efficient design features, including appropriate site orientation, use of lighter color roofing and building materials, and use of deciduous shade trees and windbreak trees to reduce fuel consumption for heating and cooling.
•All Project Applicants shall provide bicycle parking/storage facilities on site.
Bicycle parking facilities should be near destination points and easy to find.
At least one bicycle parking space for every 20 vehicle parking spaces should be provided.
•All Project Applicants shall install Class I or II bike lanes on arterial/collector streets, or where a suitable route exists consistent with Figure 3-7 Bicycle Mobility Plan of the Menifee Valley Specific Plan.
•All Project Applicants shall provide building access and paths which are physically separated from street parking lot traffic and that eliminate physical barriers such as walls, berms, landscaping and slopes that impede the use of pedestrians, bicycle facilities, or public transportation vehicles. •All Project Applicants shall provide continuous sidewalks separated from the roadway by landscaping and on-street parking where provided, consistent with Section 3.1.1, Roadway Design Standards, Section 3.2.1, Pedestrian Mobility, and Figure 3-7 Bicycle Mobility Plan of the Menifee Valley Specific Plan.
•All Project Applicants shall link cul-de-sacs and dead-end streets to encourage pedestrian and bicycle travel.
•All Project Applicants shall provide traffic reduction modifications to residential roads, such as: narrower streets, speed platforms, bulb-outs, and intersection modifications designed to reduce vehicle speeds and to encourage pedestrian and bicycle travel.
•For all parking lots, Project Applicants shall provide a parking lot design that includes clearly marked and shaded pedestrian pathways between transit facilities and building entrances.
•All Project Applicants shall provide pedestrian access between bus service and major transportation points and to destination points within the Project.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 173
Menifee Mayor and City Council
February 7, 2024
Page
559 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 63
•For all high-density residential, mixed-use, business/commercial park, and commercial uses, Project Applicants shall provide a display case or kiosk displaying transportation information in a prominent area accessible to employees, residents, or visitors such as bike route maps, bus schedules, and carpooling and car sharing in a prominent area accessible to employees, residents, or visitors.
•For all high-density residential, mixed-use, business/commercial park, and commercial uses, Project Applicants shall provide a display case or kiosk displaying transportation information in a prominent area accessible to employees, residents, or visitors such as bike route maps, bus schedules, and carpooling and car sharing in a prominent area accessible to employees, residents, or visitors.
•All Project Applicants shall design street block patterns consistent with the Menifee Valley Specific Plan and City of Menifee Standards and Ordinances. •For all mixed-use, business/commercial park, and commercial uses Project Applicants shall provide preferential parking spaces near the entrance of buildings for those who carpool/vanpool/rideshare and provide signage. •All Project Applicants shall improve the thermal integrity/efficiency of buildings and reduce the thermal load with automated and timed temperature controls or occupant sensors.
•Project Applicants for manufacturing and light industrial uses that require refrigerated vehicles, shall install an adequate number of electrical service connections at loading docks for plugging in the anticipated number of refrigerated trailers to reduce idling time and emissions. •Project Applicants for manufacturing and light industrial uses shall consider energy storage and combined heat and power in appropriate applications to optimize renewable energy generation systems and avoid peak energy use. •Project Applicants for manufacturing and light industrial uses with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with CARB Rule 2845 (13 California Code of Regulations [CCR] Chapter 10, Section 2485).
•Project Applicants shall install 240-volt electrical outlets or Level 3 chargers in parking lots that would enable charging of neighborhood electric vehicles (NEVs) and/or battery powered vehicles.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 174
Menifee Mayor and City Council
February 7, 2024
Page
560 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 64
•Project Applicants shall maximize use of solar energy including solar panels, including installing the maximum possible number of solar energy arrays on the building roofs to generate solar energy.
•Project Applicants shall maximize the planting of trees in landscaping and parking lots, consistent with the Menifee Valley Specific Plan and City of Menifee Standards and Ordinances.
•Project Applicants shall use light-colored paving and roofing materials. •Project Applicants shall install outdoor electrical outlets to promote the use of electric lawn mowers and leaf blowers.
Supportive Evidence: Please refer to Draft EIR pages 4.3-25 through 4.3-39.
6.4 Biological Resources
No impacts were concluded to be and significant and unavoidable.
6.5 Cultural Resources
No impacts were concluded to be and significant and unavoidable.
6.6 Energy
No impacts were concluded to be and significant and unavoidable.
6.7 Geology and Soils
No impacts were concluded to be and significant and unavoidable.
6.8 Greenhouse Gas Emissions
Impact 4.8-1: Significant and Unavoidable Impact
When amortized over the 30-year life of the Project as required by the SCAQMD, on-site construction activities would result in annual emissions of 1,478.8 MT CO 2e. However, construction emissions would be temporary in nature and would only occur for the duration of the construction period.
Buildout of the proposed Project would generate a total of approximately 60,570 average daily trips.
Based on the analysis results, the proposed Project would result in 68,683.8 MT CO2e per year, which would exceed the scaled SCAQMD threshold of 2,109.0 MT CO2e per year. The proposed Project would result in per service population emission of 6.0 MT CO 2e per year per service population, which exceeds the SCAQMD’s scaled screening threshold of 3.4 MT CO2e per year per service population. As such, Mitigation Measures MM AIR-2 and MM GHG-1 were identified, which would require the implementation of feasible GHG reduction measures to reduce GHG emissions. However, GHG emission impacts would remain significant and unavoidable because compliance with future efficiency targets cannot be ensured.
When amortized over the 30-year life of the Project as required by the SCAQMD, annual off-site emissions generated during off-site construction activities would be 6.0 MT CO 2e, but would be temporary in nature and would only occur for the duration of the construction period. GHG emissions Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 175
Menifee Mayor and City Council
February 7, 2024
Page
561 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 65
associated with operational off-site improvements would be minimal. However, when these emissions are combined with the on-site emissions, emissions would exceed SCAQMD’s thresholds.
While MM AIR-2 and MM GHG-1 were identified to reduce GHG emissions associated with build out of the proposed Project, including off-site improvements, GHG emission impacts would remain significant and unavoidable because compliance with future efficiency targets under the Project cannot be ensured. As such, impacts would remain significant and unavoidable.
Mitigation Measures: Based upon the analysis presented in Section 4.3, Air Quality, and Section 4.8, Greenhouse Gas Emissions of the Draft EIR, which is incorporated herein by reference, Mitigation Measure GHG-1, listed below, is feasible and are made binding through the MMRP. In addition, MM AIR-2, identified in Section 4.3, Air Quality, of the Draft EIR would also be applicable. Imposition of these mitigation measures will not reduce potentially significant impacts to less than significant. As such, the impact remains significant and unavoidable. Additionally, the following mitigation measures apply:
MM GHG-1 Prior to issuance of a building permit, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the following emission reduction measures. Implementation of the following measures is considered to be applicable, feasible, and effective in reducing greenhouse gas emissions generated by the Project:
•Exceed Title 24 standards by 20 percent.
•Install programmable thermostat timers and smart meters. •Develop Basis of Design (BOD) documents, commissioning plans, and commissioning reports for heating, ventilation, and air conditioning (HVAC) systems. Perform functional performance testing and system operations training. •Install energy efficient appliances and high-efficiency electric hot water heaters. •Provide electric vehicle (EV) chargers in parking lots. •Provide necessary infrastructure to allow use of 50 percent recycled water for outdoor irrigation.
•Adopt a water conservation strategy.
•Use water-efficient landscape irrigation systems, reduce turf in landscapes and lawns, and plant native or drought-resistant trees.
•Prohibit gas powered landscape equipment and install outdoor electrical outlets. •Use low VOC architectural coatings.
•Require cool roof materials (albedo >= 30) or install green roofs.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 176
Menifee Mayor and City Council
February 7, 2024
Page
562 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 66
•Maximize interior day light.
•Install rainwater collection systems.
•Restrict the use of water for cleaning outdoor surfaces/prohibit systems that apply water to non-vegetated surfaces.
•Plant shade trees within 40 feet of the south side or within 60 feet of the west sides of properties.
•Create new vegetated open space.
•Institute or extend recycling and composting services.
Supportive Evidence: Please refer to Draft EIR pages 4.8-22 through 4.8-33.
6.9 Hazards and Hazardous Materials
No impacts were concluded to be and significant and unavoidable.
6.10 Hydrology and Water Quality
No impacts were concluded to be and significant and unavoidable.
6.11 Land Use and Planning
Impact 4.11-2: Significant and Unavoidable
The proposed Project includes a General Plan Amendment, a Specific Plan Amendment, and a Zoning Change to accommodate for the Specific Plan uses and eliminate potential land use and planning inconsistencies. Based on the consistency analysis with the City of Menifee General Plan, the Southern California Association of Governments (SCAG) Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), the March Air Reserve Base/Inland Port Airport Land Use Compatibility Plan (MARB ALUCP), and the Multiple-Species Habitat Conservation Plan (MSHCP), the only applicable goal or policy that the proposed Project would conflict with is Policy C 1.2 of the General Plan Circulation Element. Policy C 1.2 pertains to mitigating traffic impacts and requiring development to achieve the City’s aspirational goal of peak hour LOS D or better at intersections. Under the Project, several intersections would operate at deficient Level of Service (LOS) due to a lack of right-of-way for recommended improvements, resulting in an inconsistency with Policy C 1.2 incapable of being mitigated to less than significance. A mitigation measure requiring the payment of fees or implementation of intersection improvements (MM LU-1) was identified to reduce this significant impact; however, impacts to these intersections would remain significant and unavoidable.
The proposed legislative actions such as the General Plan Amendment, Zoning Change, and Specific Plan Amendment as part of the Project do not apply to the areas in which the off-site improvement areas would occur. Further, the off-site improvements would be consistent with the existing land use and zoning designations of the City’s General Plan and other planning documents. Implementation of the General Plan, which includes the off-site roadway improvements as identified in the Circulation Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 177
Menifee Mayor and City Council
February 7, 2024
Page
563 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 67
Element, was analyzed for consistency with applicable land use and planning documents in the Certified 2013 EIR and it was determined that impacts would be less than significant.
Mitigation Measures: Based upon the analysis presented in Section 4.11, Land Use and Planning, of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure MM LU-1 is feasible and is made binding through the MMRP. Imposition of this mitigation measure will not reduce potentially significant impacts to less than significant. As such, the impact remains significant and unavoidable.
MM LU-1 Circulation Element Consistency. At intersections and roadway segments where the project contributes to an unsatisfactory LOS that conflicts with Circulation Element policies that strive to maintain desired LOS (Policy C.1.2), the Project Applicant shall be responsible or improvements identified by the City a part of the Project’s Conditions of Approval. The timeline for implementation of these improvements will also be identified in the Project’s Conditions of Approval. Where there is a funding mechanism (fee program) for the recommended improvements, payment into the fee program shall be considered sufficient for mitigation of project-related operational deficiencies. At study locations where the addition of project traffic creates an operational deficiency and there is no funding mechanism in place, the project shall be responsible for the implementation of the improvement. At locations where the project adds to or creates a forecast deficiency and there is no funding mechanism in place, the project shall be responsible for its fair share payment, as calculated based on project traffic as a percentage of total growth from existing to Horizon Year (2045) plus Project scenario conditions. The timing for payment of fees or physical improvements shall be established through the Project’s Conditions of Approval.
Supportive Evidence: Please refer to Draft EIR pages 4.11-9 through 4.11-14.
6.12 Mineral Resources
No impacts were concluded to be and significant and unavoidable.
6.13 Noise
No impacts were concluded to be and significant and unavoidable.
6.14 Population and Housing
No impacts were concluded to be and significant and unavoidable.
6.15 Public Services
No impacts were concluded to be and significant and unavoidable.
6.16 Recreation
No impacts were concluded to be and significant and unavoidable.
6.17 Transportation
Impact 4.17-1: Significant and Unavoidable
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 178
Menifee Mayor and City Council
February 7, 2024
Page
564 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 68
All on-site transportation improvements under the Project would be required to conform with City standards and conceptual design specifications for perimeter, interior residential, and commercial/business park/commercial-business park roadways. Improvements would be subject to change based on engineering review and approval by the City Engineer at the time subdivision maps are brought forward for approval. The proposed Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system except for Circulation Element Policy C 1.2 (intersection LOS), as discussed above under 6.11, Land Use and Planning. Even with payment of the Project’s fair share, implementation of local improvements, or implementation of recommended intersection improvements as required in MM LU-1, existing or forecasted operational deficiencies cannot be fully improved to an acceptable LOS at several intersections due to right-of-way constraints.
As such, the proposed Project would not be able to improve the LOS at all intersections to meet the City’s aspirational General Plan standards (Policy C 1.2), and this inconsistency would result in a significant and unavoidable impact.
The General Plan Certified 2013 EIR found that traffic volumes associated with General Plan buildout, which includes the off-site roadway improvements along Matthews Road/Case Road, McLaughlin Road, and McCall Boulevard, would exceed roadway capacity at various locations throughout the City.
As such, the Certified 2013 EIR prescribed mitigation to reduce impacts to less than significant levels, including the implementation of intersection improvements and the payment of Traffic Impact and TUMF fees. The Project Traffic Study analyzed impacts associated with buildout of the proposed Project and included improvement recommendations to Matthews Road/Case Road, McLaughlin Road, and McCall Boulevard that would address traffic impacts in conflict with the General Plan policies as identified in the Circulation Element. As the proposed Project would implement these roadway improvements and roadway improvements would be implemented to the satisfaction of the City Engineer, implementation of the off-site roadway improvements along Matthews Road/Case Road, McLaughlin Road, and McCall Boulevard would be consistent with Goal C 2 of the Circulation Element. Further, the proposed pedestrian bridge would also be consistent with Goal C 2, and rights- of-way conflicts with utilities would be resolved with the appropriate agencies. Therefore, the off-site roadway improvements would not conflict with a program, plan, ordinance, or policy addressing the circulation system.
Mitigation Measures: Based upon the analysis presented in Section 4.17, Transportation, of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure LU-1, identified in Draft EIR Section 4.11, Land Use and Planning, would be applicable. Imposition of this mitigation measure will not reduce potentially significant impacts to less than significant. As such, the impact remains significant and unavoidable.
Supportive Evidence: Please refer to Draft EIR pages 4.17-12 through 4.17-18.
Impact 4.17-2: Significant and Unavoidable
The City’s Traffic Impact Assessment (TIA) Guidelines include a numerical value of 33.6 as the County of Riverside General Plan Buildout VMT per service population or threshold. Therefore, based on the guidelines, the Project will have a significant impact if the Project VMT per service population is greater than 33.6. According to the VMT Memo prepared for the proposed Project, the Project’s VMT per service population is 20.3 percent higher and 11.6 percent higher than the threshold in the base year and build out scenarios, respectively. Based on the City guidelines, the Project would result in a Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 179
Menifee Mayor and City Council
February 7, 2024
Page
565 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 69
significant VMT impact for Project-generated VMT. Project design features and a mitigation measure (MM TRA-1) were identified to reduce Project-generated VMT but cannot be guaranteed to reduce the industrial and service component’s VMT per employee and retail component’s total VMT to a less than significant level.
No new land use would occur in the off-site improvement areas, as the proposed improvements pertain to utility installations and roadway improvements; therefore, no additional VMT outside of what is analyzed in the VMT Memo prepared for the proposed Project and discussed above would occur. As such, VMT impacts associated with the off-site improvements along Briggs Road, Menifee Road, and SR-74 would be less than significant. Implementation of the Project would also result in off- site roadway improvements, which include widening and additional turn lanes as required. However, because no new land use would occur in the off-site roadway improvement areas, no additional VMT outside of what is analyzed in the VMT Memo prepared for the proposed Project and discussed above would occur. As such, VMT impacts associated with the off-site improvements along Matthews Road/Case Road, McLaughlin Road, and McCall Boulevard would be less than significant.
Mitigation Measures: Based upon the analysis presented in Section 4.17, Transportation, of the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will not reduce potentially significant impacts to less than significant. As such, the impact remains significant and unavoidable.
MM TRA-1 Prior to issuance of building permit/occupancy permits, the Project Applicant shall prepare a Transportation Demand Management (TDM) strategy report for review and approval by the City Traffic/Transportation Manager. The TDM strategy shall include measures to reduce Project vehicle miles traveled (VMT), including but not limited to:
•Construction of an additional 44.8 miles of sidewalks. CAPCOA transportation measure “T-18: Provide Pedestrian Network Improvement” was deemed applicable to estimate the VMT reduction due to Project pedestrian features.
Based on CAPCOA estimates, the pedestrian features have a potential to reduce 6.4 percent of the Project VMT, which is the cap or maximum for the measure.
•Construction of interconnecting Class I, Class II, and Class III bike lanes throughout the interior and perimeter of the Project site). Specific Plan uses would also provide appropriate bicycle facilities (i.e., racks and lockers) as required by the latest California Green Building Standards (CALGreen Code
5.106.4 Bicycle Parking).
oCAPCOA transportation measure "T-19A: Construct or Improve Bike Facility" was deemed applicable to estimate the VMT reduction due to Project bicycle features. Based on CAPCOA estimates, the Project bicycle design features have a potential to reduce 0.5 percent of the Project VMT for all the bicycle facilities combined.
oCAPCOA transportation measure "T-10: Provide End-of-Trip Bicycle Facilities" was deemed applicable to estimate the VMT reduction due to end-of-trip bike facilities. A total of six facilities were assumed:
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 180
Menifee Mayor and City Council
February 7, 2024
Page
566 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 70
▪One facility in Planning Area 6 for the proposed school site; ▪One facility each for the Business Park uses in Planning Areas 10, 11, and 12; and
▪Two facilities in Planning Area 13 for Commercial uses (both sides of Malaga Road). Based on CAPCOA estimates, the
Project end-of-trip bicycle facilities at all six locations have a combined potential to reduce 0.4 percent of the Project VMT.
•Provide Electric Vehicle Parking and EV Charging Infrastructure. CAPCOA transportation measure "T-14: Provide Electric Vehicle Charging Infrastructure" was deemed applicable to estimate VMT reduction via reduced GHG emissions. Based on CAPCOA estimates, provision of EV charging infrastructure has a potential to achieve a maximum VMT reduction of up to 11.9 percent, dependent on the number of EV charging stations the Project may provide (in addition to CALGreen requirements). •Unbundle Residential Parking Costs from Property Costs. CAPCOA transportation measure "T-16: Unbundle Residential Parking Costs from Property Cost" was deemed applicable to estimate VMT reduction by charging for additional residential parking space. Based on CAPCOA estimates, fee implementation of additional parking space has a potential to achieve a maximum of up to 15.7 percent VMT reduction for the Project's multifamily uses.
Supportive Evidence: Please refer to Draft EIR pages 4.17-18 through 4.17-23.
6.18 Tribal Cultural Resources
No impacts were concluded to be and significant and unavoidable.
6.19 Utilities
No impacts were concluded to be and significant and unavoidable.
6.20 Wildfire
No impacts were concluded to be and significant and unavoidable.
7.0 FINDINGS REGARDING GROWTH INDUCING IMPACTS
Section 15126.2(d) of the State CEQA Guidelines requires that an EIR:
“Discuss the ways in which the proposed project could foster economic or population growth, or the construction of additional housing, either directly or indirectly, in the surrounding environment.”
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 181
Menifee Mayor and City Council
February 7, 2024
Page
567 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 71
Additionally, State CEQA Guidelines Section 15126.2(e) specifies that growth does not necessarily imply impacts that are beneficial, detrimental, or of little significance to the environment. A project that meets any of these criteria may be considered growth inducing. To address these issues, potential growth-inducing effects were examined through analysis of the following questions:
•Would the project remove obstacles to, or otherwise foster, population growth (e.g., through the construction or extension of major infrastructure facilities that do not presently exist in the project area, or through changes in existing regulations pertaining to land development)? •Would the project foster economic growth?
Here, the Project would not result in significant growth-inducing impacts.
Implementation of the proposed Project transfers up to 1,718 single-family and multi-family residential homes and residential neighborhood amenities previously approved under Menifee Valley Ranch Specific Plan No. 301 to the Project site. Although these units were previously approved for the Menifee Valley Ranch Specific Plan No. 301, the proposed Project would result in direct population growth in the city through development of up to 1,718 units, with a corresponding population increase of approximately 5,220 persons. 3 The population growth induced by the proposed Project has previously been accounted for since the Project would transfer 1,718 residential units approved under Menifee Valley Ranch Specific Plan No. 301 to the Project site. In addition, although the Project site is located adjacent to existing infrastructure that would provide adequate service connections for the proposed Project, the proposed Project would also include infrastructure improvements to water facilities, sanitary sewer facilities, natural gas utilities, and stormwater drainage facilities as well as connection to existing utility infrastructure per the applicable connection requirements and easement agreements established by the respective utility providers. While the proposed Project requires additional water, sewer, electricity, and natural gas lines on site compared to existing conditions, such improvements would be intended to meet Project-related demand and would not necessitate substantial utility infrastructure improvements.
The proposed Project would also provide jobs close to home for current and future city residents, and thus the Project would serve to improve the housing-jobs balance in the northeastern portion of the city. As of June 2022, the city had a labor force of 42,700, and the county had a labor force of 1,146,300, with approximately 1,700 and 45,300 people unemployed, respectively. 4 The June 2022 unemployment rate was 4.0 percent for the city and 4.0 percent for the county. 5 These elevated 3 87.2 percent of residential development is single-family; 12.8 percent of residential development is multi- family (per the Menifee Valley Specific Plan).
87.2% * 1,718 =1,498 single-family units; 12.8% * 1,718 = 220 multi-family units 3.12 persons per unit * 1,498 units = 4,674 persons (single-family households) 2.48 persons per unit * 220 units = 546 persons (multi-family households) 4,674 + 546 = 5,220 persons
4 California Employment Development Department. 2022. Labor Market Information Division, Monthly Labor Force Data for Cities and Census Designated Places June 2022. Website:
https://www.labormarketinfo.edd.ca.gov/data/unemployment-and-labor-force.html (accessed July 31, 2022).
5 Ibid.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 182
Menifee Mayor and City Council
February 7, 2024
Page
568 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 72
unemployment figures reflect the economic slowdown associated with the widespread shelter-in- place orders in effect throughout much of 2020 and 2021 due to the ongoing COVID-19 pandemic.
Although there is a great deal of uncertainty regarding the pandemic’s effect on the economy, it has resulted in reduced business activity and related higher unemployment in the area. This suggests an ample available local and regional labor pool to serve the long-term employment opportunities offered by the Project and makes it unlikely that the Project’s labor demand would need to draw a substantial number of employees from outside the region to meet the need for employees resulting from development of the Project site. Therefore, short-term employment opportunities offered by the construction phases of the proposed Project would likely be met by the available local and regional labor pool. Further, the proposed Project would provide long-term jobs close to home for current and future city residents, and thus the Project would serve to improve the housing-jobs balance in the northeastern portion of the city.
In addition, the Land Use Buildout Summary (Exhibit LU-4) provided in the Land Use Element of the City’s General Plan has identified future urban uses and development on the Project site. The proposed Project would remain consistent with the land use buildout calculations provided by the General Plan and therefore would not lead to unplanned growth not previously anticipated by the City and the utility companies.
Further, the Project site in its existing condition does not currently generate substantial tax revenue for the City as the site is undeveloped and vacant. With implementation of the proposed Project, up to 5,600,000 square feet of development at a maximum of 0.5 Floor Area Ratio (FAR) would be developed for a mix of light industrial, manufacturing, warehouse/storage, and e-commerce operations, and up to 260,000 square feet of development at a maximum of 0.25 FAR would be developed for a mix of commercial, retail, small-scale light industrial, warehouse/storage, and manufacturing. In addition to the long-term employment that the proposed Project would provide at Specific Plan build out, the proposed Project would generate a small number of temporary construction-related jobs in Menifee during the construction period. Construction workers are anticipated to be drawn from the existing regional work force, and construction of the proposed Project would not be growth inducing from an employment standpoint. As described above, the proposed Project would generate new permanent employment opportunities. Therefore, the proposed Project would result in significant economic growth.
Although the proposed Project would result in the development of 1,718 dwelling units, which is expected to increase the population in Menifee by approximately 5,220, this would not result in a net increase in the number of residents and employees on the Project site from the originally anticipated increase associated with development of the northern portion of the Menifee Valley Specific Plan No. 301. Additionally, given that the employment opportunities generated by construction and operation of the proposed Project would be filled by people who would commute to the Project site, the potential population growth associated with Project employees would be minimal.
Finding: The City adopts CEQA Finding 1.
The City hereby finds that the Project does not directly result in any significant growth-inducing impacts. The Project would not result in a net increase in the number of residents and employees on Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 183
Menifee Mayor and City Council
February 7, 2024
Page
569 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 73
the Project site from the originally anticipated increase associated with development of the northern portion of the Menifee Valley Specific Plan No. 301.
Supportive Evidence: Please refer to Draft EIR pages 6-5 through 6-7.
8.0 FINDINGS REGARDING PROJECT ALTERNATIVES
The following alternatives were addressed in the Draft EIR:
•Alternative 1: No Project
•Alternative 2: Residential/Commercial-Office Alternative •Alternative 3: Reduced Business Park Alternative
8.1 No Project Alternative (Alternative 1)
Description: State CEQA Guidelines § 15126.6, requires an evaluation of the “No Project” alternative for decision-makers to compare the impacts of approving a project with the impacts of not approving it. Under Alternative 1: No Project Alternative (Alternative 1), the Project site would be developed as currently entitled under the existing Menifee Valley Ranch Specific Plan (SP 301). Per the current SP 301 (Amendment No. 3), the 590.3-acre Project site would be developed with 1,718 residential units of varying densities and 213.1 acres of open space and recreational uses, including three parks, greenbelts, a recreation area (golf course), storm water detention, and conservation uses. This alternative substantially increases the amount of open space and recreational uses provided within the Project site when compared to the proposed Project (44.5 acres).
Finding – The City adopts Finding 3.
The City finds that while Alternative 1 would be less impactful than the proposed Project in almost all of the environmental impact areas, and would likely eliminate the significant and unavoidable land use and planning and transportation and traffic impact, the elimination of the business park and commercial uses would likely increase the average VMT per service population and would not achieve the primary Project objectives of balancing housing needs and community amenities with job- producing uses, attracting economic investment to the City of Menifee, or providing goods, services, and job opportunities to the surrounding community and region.
Supporting Evidence – Please see Draft EIR Pages 5-12 through 5-20.
8.2 Residential/Commercial-Office Alternative (Alternative 2) Description: The Residential/Commercial-Office Alternative envisions the development of 1.250 million square feet of commercial and office uses along SR-74. Based on a target floor to area ratio (FAR) of 0.30, approximately 96.7 acres would be devoted to these uses. It is anticipated this area would allow the development of neighborhood, local, and regional serving retail, service, office- related (e.g., legal, financial, insurance, engineering and similar professions) uses, and/or hotel uses currently permitted in the City’s Commercial Retail (CR) and Commercial Office (CO) zones. This Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 184
Menifee Mayor and City Council
February 7, 2024
Page
570 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 74
alternative includes a similar amount of open space (44.5 acres) as the proposed Project to accommodate greenbelts, active recreation, and conservation uses as well as a similar amount of land (32.4 acres) for the improvement of perimeter and primary interior roadways. Approximately 15.5 acres would be reserved for a potential future school site. The balance of land, approximately 402.3 acres, would be dedicated for development of 1,718 dwelling units with an average density of 4.3 dwellings per acre. Under this alternative, the 5.51 million square feet of business park/commercial business park uses would not be developed.
It is expected that some off-site infrastructure and landscape improvements would be required for this alternative and would have similar impacts as the proposed Project. In addition, it is expected that the off-site roadway improvements would still be required in order to reduce impacts associated with conflicts with aspirational General Plan land use and transportation policies.
Finding – The City adopts Finding 3.
The City finds that Alternative 2 would result in less than significant impacts in most of the environmental impact areas and could be less impactful in Energy and Hazards and Hazardous Materials. However, this alternative would likely result in significant and unavoidable impacts to Air Quality, Greenhouse Gas Emissions, Land Use and Planning, and Transportation and Traffic. Although both the proposed Project and Alternative 2 would exceed the City’s VMT threshold, Alternative 2 would significantly increase VMT when compared to the proposed Project. Therefore, Alternative 2 would not reduce or eliminate significant and unavoidable impacts associated with the proposed Project.
Alternative 2 would meet most of the Project objectives; however, by eliminating business park and commercial business park uses, this alternative would meet the Project objectives of attracting economic investment to the City and providing goods, services, and job opportunities to the surrounding community and region to a lesser extent than the proposed Project. Additionally, this alternative would not meet the Project objective of providing a public facility/civic node (e.g., fire station, transit stop) on the Project site.
Supporting Evidence – Please see Draft EIR Pages 5-21 through 5-28.
8.3 Reduced Business Park Alternative (Alternative 3)
Description: This alternative would reduce business park uses by 25 percent (approximately 1,377,500 million sf), resulting in development of approximately 4,132,500 million sf of business park and commercial-business park uses. Based on a FAR of 0.50, this reduction would reduce the area devoted to these uses by approximately 63.3 acres. The commercial, open space, roadway, and public facility/school components of the proposed Project would remain unchanged.
When added to the residential area identified under the proposed Project, the 63.3 acres gained through the reduction in business park uses would increase the total residential area of the site to 250.1 acres. This alternative includes development of the same number of residential units (1,718); therefore, overall residential density would be approximately 6.9 units per acre.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 185
Menifee Mayor and City Council
February 7, 2024
Page
571 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 75
It is expected that some off-site infrastructure and landscape improvements would be required for this alternative and would have similar impacts as the proposed Project. In addition, it is expected that the off-site roadway improvements would still be required in order to reduce impacts associated with conflicts with aspirational General Plan land use and transportation policies.
Finding – The City adopts Finding 3.
Alternative 3 would be located on the same site as the proposed Project and therefore would have similar impacts to land-based CEQA resource topics as the proposed Project, including Agricultural and Forestry Resources, Biological Resources, Cultural Resources, Geology and Soils, Mineral Resources, Tribal Cultural Resources, and Wildfire.
Supporting Evidence – Please see Draft EIR Pages 5-28 through 5-34.
9.0 FINDINGS REGARDING THE MITIGATION MONITORING AND REPORTING PROGRAM Section 21081.6 of the Public Resources Code requires that when making findings required by Section 21081(a) of the Public Resources Code, the Lead Agency approving a project shall adopt a reporting or monitoring program for the changes to the project which it has adopted or made a condition of project approval, in order to ensure compliance with project implementation and to mitigate or avoid significant effects on the environment. The City hereby finds that:
1) A Mitigation Monitoring and Reporting Program (MMRP) has been prepared for the Project, and the mitigation measures are included therein. The MMRP is incorporated herein by reference and is considered part of the record of proceedings for the Project. 2) The MMRP designates responsibility for implementation and monitoring of proposed mitigation measures. The City’s Community Development Director will serve as the overall MMRP coordinator and will be primarily responsible for ensuring that all mitigation measures are complied with. 3) The MMRP prepared for the Project has been adopted concurrently with these Findings. The MMRP meets the requirements of Section 21021.6 of the Public Resources Code. The City will use the MMRP to track compliance with mitigation measures. The MMRP will remain available for public review during the compliance period.
10.0 OTHER FINDINGS
The City hereby finds as follows:
1) The foregoing statements are true and correct;
2) The City is the “Lead Agency” for the Project evaluated in the CEQA Documents and independently reviewed and analyzed in the Draft EIR and Final EIR for the Project; 3) The Notice of Preparation of the Draft EIR was circulated for public review. It requested that responsible agencies respond as to the scope and content of the environmental information germane to that agency’s specific responsibilities;
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 186
Menifee Mayor and City Council
February 7, 2024
Page
572 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 76
4) The public review period for the Draft EIR was for 45 days between October 19, 2023 and December 4, 2023. The Draft EIR and appendices were available for public review during that time. A Notice of Completion and copies of the Draft EIR were sent to the State Clearinghouse, and notices of availability of the Draft EIR were published by the City. The Draft EIR was available for review on the City’s website. Physical copies of the environmental documents are available at the City of Menifee Community Development Department, Sun City Library, and the Menifee Library; 5) The CEQA Documents were completed in compliance with CEQA; 6) The CEQA Documents reflect the City’s independent judgment; 7) The City evaluated comments on environmental issues received from persons and organizations who reviewed the Draft EIR. In accordance with CEQA, the City prepared written responses describing the disposition of significant environmental issues raised. The Final EIR provided adequate, good faith and reasoned responses to the comments. The City reviewed the comments received and responses thereto and has determined that neither the comments received nor the responses to such comments add significant new information to the Draft EIR regarding adverse environmental impacts. The City has based its actions on full appraisal of all viewpoints, including all comments received up to the date of adoption of these Findings, concerning the environmental impacts identified and analyzed in the Final EIR.
8) The City finds that the CEQA Documents, as amended, provide objective information to assist the decision-makers and the public at large in their consideration of the environmental consequences of the Project. The public review period provided all interested jurisdictions, agencies, private organizations, and individuals the opportunity to submit all comments made during the public review period;
9) The CEQA Documents evaluated the following impacts: (1) aesthetics; (2) agriculture and forestry; (3) air quality; (4) biological resources; (5) cultural resources; (6) energy; (7) geology and soils; (8) greenhouse gas emissions; (9) hazards and hazardous materials; (10) hydrology and water quality; (11) land use and planning; (12) mineral resources; (13) noise; (14) population and housing; (15) public services; (16) recreation; (17) transportation and circulation; (18) tribal cultural resources; (19) utilities and service systems; (20) wildfire. Additionally, the CEQA Documents considered, in separate sections, significant irreversible environmental changes and growth-inducing impacts of the Project, as well as a reasonable range of project alternatives. All of the significant environmental impacts of the Project were identified in the CEQA Documents;
10) The MMRP includes all of the mitigation measures identified in the CEQA Documents and has been designed to ensure compliance during implementation of the Project. The MMRP provides the steps necessary to ensure that the mitigation measures are fully enforceable; 11) The MMRP designates responsibility and anticipated timing for the implementation of mitigation; the City’s Community Development Director will serve as the MMRP Coordinator; 12) In determining whether the Project may have a significant impact on the environment, and in adopting these Findings pursuant to Section 21081 of CEQA, the City has complied with CEQA Sections 21081.5 and 21082.2;
13) The impacts of the Project have been analyzed to the extent feasible at the time of certification of the CEQA Documents;
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 187
Menifee Mayor and City Council
February 7, 2024
Page
573 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 77
14) The City made no decisions related to approval of the Project prior to the initial recommendation of certification of the CEQA Documents. The City also did not commit to a definite course of action with respect to the Project prior to the initial consideration of the CEQA Documents. 15) Copies of all the documents incorporated by reference in the CEQA Documents are and have been available upon request at all times at the offices of the City of Menifee Community Development Department, the custodian of record for such documents or other materials; 16) The responses to the comments on the Draft EIR, which are contained in the Final EIR, clarify and amplify the analysis in the Draft EIR;
17) Having reviewed the information contained in the CEQA Documents and in the administrative record, the City finds that there is no new significant information regarding adverse environmental impacts of the Project in the Final EIR; and
18) Having received, reviewed and considered all information in the CEQA Documents, as well as all other information in the record of proceedings on this matter, these Findings are hereby adopted by the City in its capacity as the CEQA Lead Agency.
11.0 STATEMENT OF OVERRIDING CONSIDERATIONS
Pursuant to PRC § 21081(b), and CEQA Guidelines § 15093(a) and (b), the decision-making agency is required to balance, as applicable, the economic, legal, social, technological, or other benefits of the project against its unavoidable environmental risks when determining whether to approve a project.
If the specific economic, legal, social, technological, or other benefits of the project outweigh the unavoidable adverse environmental effects, those effects may be considered “acceptable” (14 CCR § 15093 (a)). CEQA requires the agency to support, in writing, the specific reasons for considering a project acceptable when significant impacts are not avoided or substantially lessened. Those reasons must be based on substantial evidence in the Final EIR or elsewhere in the administrative record (14 CCR § 15093(b)).
Courts have upheld overriding considerations that were based on a variety of policy considerations including, but not limited to, new jobs, stronger tax base, and implementation of an agency’s economic development goals, growth management policies, redevelopment plans, the need for housing and employment, conformity to community plan, and provision of construction jobs; see Towards Responsibility in Planning v. City Council (1988) 200 Cal App. 3d 671; Dusek v. Redevelopment Agency (1985) 173 Cal App. 3d 1029; City of Poway v City of San Diego (1984) 155 Cal App. 3d 1037; and Markley v. City Council (1982) 131 Cal App.3d 656.
In accordance with the requirements of CEQA and the CEQA Guidelines, the City finds that the mitigation measures identified in the Final EIR and the Mitigation Monitoring and Reporting Program (MMRP), when implemented, would avoid, or substantially lessen all of the significant effects identified in the Final EIR for the Menifee Valley Specific Plan (Project). However, certain significant impacts of the Project are unavoidable even after incorporation of all feasible mitigation measures.
These significant unavoidable impacts would result from air quality impacts due to the potential to conflict or obstruct implementation of applicable air quality plans under AQMP Indicator No. 1 and exceedance of criteria air pollutant emissions during Project operational activities. The Project would Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 188
Menifee Mayor and City Council
February 7, 2024
Page
574 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 78
implement development-specific air quality mitigation measures identified in this analysis (MM AIR- 1 through MM AIR-3), acting to generally reduce the Project’s operational-source air pollutant emissions. In addition, implementation of Mitigation Measure TRA-1 identified in Section 4.17 would further reduce impacts; however, the emission reduction associated with some measures, including those that would reduce Project-related VMT, cannot be quantified. Based on the analysis presented here, the Project is considered to be inconsistent with applicable AQMP Consistency Criteria and operational thresholds, resulting in a significant and unavoidable impact. Additionally, greenhouse gas emissions would exceed the SCAQMD’s scaled screening threshold of 3.4 MT CO2e per year per service population. Because compliance with future efficiency targets cannot be ensured, GHG emission impacts would remain significant and unavoidable, even with implementation of Mitigation Measure AIR-2 in Section 4.3, Air Quality, and GHG-1 in Section 4.8, Greenhouse Gas Emissions.
Development of the proposed Project would result in a conflict with the General Plan Circulation Element. Despite payment of fees or implementation of intersection improvements identified in MM LU-1, in Section 4.11, Land Use and Planning, land use impacts would remain significant and adverse.
Further, Project-related traffic would conflict with the aspirational goals for desired level of service in the General Plan Circulation Element. Even with implementation of MM LU-1, in Section 4.11, Land Use and Planning, development of the Project would conflict with the aspirational level of service goals of the General Plan Circulation Element. The Project could also conflict with State CEQA Guidelines Section 15064.3, Subdivision(b) related to VMT. Mitigation Measure TRA-1 identified in Section 4.17 would help reduce VMT impacts but cannot be guaranteed to reduce the industrial and service component’s VMT per employee and retail component’s total VMT to a less than significant level. VMT impacts would be reduced but not entirely eliminated with the implementation of Mitigation Measure TRA-1 identified in Section 4.17.
The City finds that all feasible mitigation measures identified in the Final EIR that are within the purview of the City would be implemented with the Project. As identified below, the City further finds that the remaining significant unavoidable effects are outweighed and are found to be acceptable due to the following specific overriding economic, legal, social, technological, or other benefits, based upon the facts set forth above, the Final EIR, and the record.
The City finds that any one of the benefits set forth below is sufficient by itself to warrant approval of the Project. This determination is based on the findings herein and the evidence in the record.
The following economic, legal, social, or technological benefits, independent of the other benefits, override the potential significant unavoidable adverse impacts and render acceptable each of the unavoidable adverse environmental impacts. Having balanced the unavoidable adverse environmental impacts against each of the benefits, the City hereby adopts this Statement of Overriding Considerations for the following reasons:
1. All feasible mitigation measures have been imposed to lessen Project impacts to less than significant levels; alternatives to the Project are infeasible because while they have similar or less environmental impacts, they do not provide the economic benefits of the Project, or are otherwise socially or economically infeasible when compared to the Project.
2. Consistency with and contribution to achieving the goals and objectives established by the General Plan.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 189
Menifee Mayor and City Council
February 7, 2024
Page
575 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 79
3. Create employment-generating opportunities for citizens of Menifee and surrounding communities through construction, operation, and indirect jobs off-site within the City.
Additional employment (estimated at more than 5,800 jobs) will improve the jobs-housing balance.
4. Attract businesses that can expedite the delivery of essential goods to consumers and businesses in Menifee and beyond the City’s boundary.
5. Increase in property taxes through development of vacant and unused parcels, payment of Development Impact Fees (DIF) and Transportation Uniform Mitigation Fees (TUMF) (estimated at more than $65M), investment in infrastructure spurring growth leading to more permanent City jobs and increased economic output. The sales tax revenues generated on behalf of the City by the local employees and residents within the Project and extended benefit areas would represent a boost to the City’s economy.
6. Improvement of infrastructure will enhance the quality of life for the City’s residents by linking land use, transportation and infrastructure development.
7. Provide high-quality and sustainable development meeting CalGreen Building Code energy efficiency requirements.
8. Supply a range of housing opportunities (up to 1,718 homes) which will help to satisfy the City’s housing needs.
9. Development of incubator space designed specifically for small business along Highway 74.
10. Development of a Community Farm valued at approximately $3M.
11. Development of a retail commercial center at the intersection of State Route 74 and Malaga Road.
12. Development of a community park, aquatics center, and trails for bicycles and pedestrians.
13. Public benefits over $37M established through a Development Agreement between the applicant and the City that would establish early and additional transportation improvements, and a $10m cash contribution/land dedication for a City fire station, park, and pedestrian bridge.
14. Payment of fair share fees of more than $4.7M for offsite improvements.
15. Net fiscal benefit estimated at over $1M per year to the City of Menifee General fund.
12.0 CITY GENERAL PLAN GOALS AND POLICIES
The following General Plan Goals and Policies are applicable to the Project, were included in the Draft EIR.
Goals and policies from the Land Use Element applicable to the Project include:
Goal LU 1: Land uses and building types that result in a community where residents at all stages of life, employers, and visitors have a diversity of options where they can live, work, shop, and recreate within Menifee.
Policy LU 1.2: Provide a spectrum of housing types that match the jobs in the City and make it possible for people to live and work in Menifee and maintain a high quality of life.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 190
Menifee Mayor and City Council
February 7, 2024
Page
576 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 80
Policy LU 1.4: Preserve, protect, and enhance established rural, estate, and residential neighborhoods by providing sensitive and well-designed transitions between these neighborhoods and adjoining areas.
Policy LU 1.7: Ensure neighborhood amenities and public facilities are distributed equally throughout the City.
Policy LU 1.8: Ensure new development is carefully designed to avoid or incorporate natural features including washes, creeks, and hillsides.
Policy LU 1.10: Buffer sensitive land uses from major air pollutant emission sources, including freeways, manufacturing, hazardous materials storage, and similar uses.
Policy LU 1.12: Implement the policies of the Housing Element that promote a range of housing options, types and affordable housing units, that will enable the City to achieve its share of the RHNA.
Goal LU 3: A full range of public utilities and related services that provide for the immediate and long-term needs of the community.
Policy LU 3.1: Work with utility providers in the planning, designing, and siting of distribution and support facilities to comply with the standards of the General Plan and Development Code.
Policy LU-3.2: Work with utility provides to increase service capacity as demand increases.
Policy LU-3.3: Coordinate public infrastructure improvements through the city's Capital Improvement Program.
Policy LU-3.4: Require that approval of new development be contingent upon the project's ability to secure appropriate infrastructure services.
Policy LU 3.5: Facilitate the shared use of right-of-way, transmission corridors, and other appropriate measures to minimize the visual impact of utilities infrastructure throughout Menifee.
Goal LU 4: Ensure development is consistent with the Riverside County Airport Land Use Compatibility Plan.
Policy LU 4.1: Ensure that land use decisions within the March Air Reserve Base areas of influence are consistent with applicable ALUCP. Comply with State law regarding projects subject to review by the Riverside County Airport Land Use Commission.
Goals and policies from the Circulation Element applicable to the Project include:
Goal C-1: A roadway network that meets the circulation needs of all residents, employees, and visitors to the City of Menifee.
Policy C-1.1: Require roadways to comply with federal, state, and local design and safety standards; meet the needs of multiple transportation modes and users; be compatible with the streetscape and surrounding land uses; and be maintained in accordance with best practices.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 191
Menifee Mayor and City Council
February 7, 2024
Page
577 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 81
Policy C-1.2: Require development to mitigate its traffic impacts and achieve a peak hour Level of Service (LOS) D or better at intersections, except at constrained intersections at close proximity to the I-215 where LOS E may be permitted.
Policy C-1.5: Minimize idling times and vehicle miles traveled to conserve resources, protect air quality, and limit greenhouse gas emissions.
Goal C-2: A bikeway and community pedestrian network that facilitates and encourages nonmotorized travel throughout the City of Menifee.
Policy C-2.1: Require on- and off- street pathways to comply with federal, state, and local design and safety standards; meet the needs of multiple types of users; be compatible with the streetscape and surrounding land uses; and be maintained in accordance with best practices.
Policy C-2.2: Provide off-street multipurpose trails and on-street bike lanes as our primary paths of citywide travel and explore the shared use of low-speed roadways for connectivity wherever it is safe to do so.
Policy C-2.3: Require walkways that promote safe and convenient travel between residential areas, businesses, schools, parks, recreation areas, transit facilities, and other key destination points.
Policy C-2.4: Explore opportunities to expand the pedestrian and bicycle networks; this includes consideration of utility easements, drainage corridors, road rights-of-way, and other potential options.
Policy C-2.5: Work with the Western Riverside Council of Governments to implement the Non- Motorized Transportation Plan for Western Riverside County.
Goal C-3: A public transit system that is a viable alternative to automobile travel and meets basic transportation needs of the transit dependent.
Policy C-3.2: Require new development to provide transit facilities, such as bus shelters, transit bays, and turnouts, as necessary.
Goal C-6: Scenic highway corridors that are preserved and protected from change which would diminish the aesthetic value of lands adjacent to the designated routes.
Policy C-6.1: Design developments within designated scenic highway corridors to balance the objectives of maintaining scenic resources with accommodating compatible land uses.
Policy C-6.4: Incorporate riding, hiking, and bicycle trails and other compatible public recreational facilities within scenic corridors.
Goals and policies from the Open Space and Conservation Element applicable to the Project include:
Goal OSC 1: A comprehensive system of high-quality parks and recreation programs that meets the diverse needs of the community.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 192
Menifee Mayor and City Council
February 7, 2024
Page
578 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 82
Policy OSC 1.1: Provide parks and recreational programs to meet the varied needs of the community residents and make these facilities and services easily accessible and affordable to all users.
Policy OSC 1.2: Require a minimum of five acres of public open space to be provided for every 1,000 city residents.
Policy OSC 1.3: Locate and distribute parks and recreational facilities throughout the community so that most residents are within walking distance of a public open space.
Policy OSC 1.4: Enhance the natural environment and viewsheds through park design and site selection while preserving sensitive biological, cultural, and historic resources.
Policy OSC 1.5: Make parks as safe as possible by promoting the latest developments in facility design and equipment technology.
Policy OSC 1.7: Ensure that parks and recreational facilities are well-maintained by the responsible agency.
Goal OSC-3: Undisturbed slopes, hillsides, rock outcroppings, and other natural landforms that enhance the City’s environmental setting and rich cultural and historical past and present.
Policy OCS-3.1: Identify and preserve the view corridors and outstanding scenic vistas within the city.
Policy OCS-3.2: Promote thoughtful hillside development that respects the natural landscape by designing houses that fit into the natural contours of the slope and sensitive development that preserves and protects important cultural and biological resources.
Policy OCS-3.3: Encourage the use of clustered development and other site planning strategies to facilitate the preservation of the city's natural landforms, boulders, and rock outcroppings.
Policy OCS-3.4: Support the preservation of natural vegetation and rock outcroppings during and after the construction process.
Goal OSC-4: Efficient and environmentally appropriate use and management of energy and mineral resources to ensure their availability for future generations.
Policy OCS-4.1: Apply energy efficiency and conservation practices in land use, transportation demand management, and subdivision and building design.
Policy OCS-4.2: Evaluate public and private efforts to develop and operate alternative systems of energy production, including solar, wind, and fuel cell.
Policy OCS-4.3: Advocate for cost-effective and reliable production and delivery of electrical power to residents and businesses throughout the community.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 193
Menifee Mayor and City Council
February 7, 2024
Page
579 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 83
Policy OSC-4.4: Require that any future mining activities be in compliance with the State Mining Reclamation Act, federal and state environmental regulations, and local ordinances.
Policy OSC-4.5: Limit the impacts of mining operations on the city’s natural open space, biological and scenic resources, cultural resources and landscapes, and any adjacent land uses.
Goal OSC-5: Archaeological, historical, and cultural resources are protected and integrated into the city’s built environment.
Policy OSC-5.1: Preserve and protect archaeological and historic resources and cultural sites, places, districts, structures, landforms, objects and native burial sites, traditional cultural landscapes and other features, consistent with state law and any laws, regulations or policies which may be adopted by the city to implement this goal and associated policies.
Policy OSC-5.2: Work with local schools, organizations, appropriate Native American tribes with ancestral territories located within the city and other agencies to educate the public about the rich archaeological, historic, and cultural resources found in the city.
Policy OSC-5.3: Preserve sacred sites identified in consultation with the appropriate Native American tribes whose ancestral territories are within the city, such as Native American burial locations, by avoiding activities that would negatively impact the sites, while maintaining the confidentiality of the location and nature of the sacred site.
Policy OSC-5.4: Establish clear and responsible policies and best practices to identify, evaluate, and protect previously unknown archaeological, historic, and cultural resources, following applicable CEQA and NEPA procedures and in consultation with the appropriate Native American tribes who have ancestral lands within the city.
Policy OSC-5.5: Develop clear policies regarding the preservation and avoidance of cultural resources located within the city, in consultation with the appropriate Native American tribes who have ancestral lands within the city.
Policy OSC-5.6: Develop strong government-to-government relationships and consultation protocols with the appropriate Native American tribes with ancestral territories within the city in order to ensure better identification, protection and preservation of cultural resources, while also developing appropriate educational programs, with tribal participation, for Menifee residents.
Goal OSC-6: High value agricultural lands available for long-term agricultural production in limited areas of the city.
Policy OSC-6.1: Protect both existing farms and sensitive uses around them as agricultural acres transition to more developed land uses.
Goal OCS-7: A reliable and safe water supply that effectively meets current and future user demands.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 194
Menifee Mayor and City Council
February 7, 2024
Page
580 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 84
Policy OCS-7.1: Work with the Eastern Municipal Water District to ensure that adequate, high- quality potable water supplies and infrastructure are provided to all development in the community.
Policy OCS-7.2: Encourage water conservation as a means of preserving water resources.
Policy OCS-7.3: Coordinate with the Eastern Municipal Water District to educate the public on the benefits of water conservation and promote strategies residents and businesses can employ to reduce their water usage.
Policy OCS-7.4: Encourage the use of reclaimed water for the irrigation of parks, golf courses, public landscaped areas, and other feasible applications as service becomes available from the Eastern Municipal Water District.
Policy OSC 7.5: Utilize a wastewater collection, treatment, and disposal system that adequately serves the existing and long-term needs of the community.
Policy OSC 7.6: Work with the Eastern Municipal Water District to maintain adopted levels of service standards for sewer service systems.
Policy OSC 7.7: Maintain and improve existing level of sewer service by improving infrastructure and repairing existing deficiencies.
Policy OCS-7.8: Protect groundwater quality by decommissioning existing septic systems and establishing connections to sanitary sewer infrastructure.
Policy OCS-7.9: Ensure that high quality potable water resources continue to be available by managing stormwater runoff, wellhead protection, and other sources of pollutants.
Policy OCS-7.10: Preserve natural floodplains, including Salt Creek, Ethanac Wash, Paloma Wash, and Warm Springs Creek, to facilitate water percolation, replenishment of the natural aquifer, proper drainage, and prevention of flood damage.
Policy OCS-7.11: Ensure that natural and cultural resources are protected and avoided while still maintaining important water goals.
Goal OSC 8: Protected biological resources, especially sensitive and special status wildlife species and their natural habitats.
Policy OSC 8.1: Work to implement the Western Riverside County Multiple Species Habitat Conservation Plan in coordination with the Regional Conservation Authority.
Policy OSC 8.2: Support local and regional efforts to evaluate, acquire, and protect natural habitats for sensitive, threatened, and endangered species occurring in and around the city.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 195
Menifee Mayor and City Council
February 7, 2024
Page
581 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 85
Policy OSC 8.3: Partner with non-profit agencies at the local, regional, state, and federal level to fulfill the obligations of the MSHCP to preserve and protect significant biological resources.
Policy OSC 8.5: Recognize the impacts new development will have on the city's natural resources and identify ways to reduce these impacts.
Policy OSC 8.7: Manage the recreational use of the city's unimproved open space areas for compatibility with sensitive biological resources as well as MSHCP Conservation Areas.
Goal OSCV-9: Reduced impacts to air quality at the local level by minimizing pollution and particulate matter.
Policy OCS-9.1: Meet State and federal clean air standards by minimizing particulate matter emissions from construction activities.
Policy OCS-9.2: Buffer sensitive land uses, such as residences, schools, care facilities, and recreation areas from major air pollutant emission sources, including freeways, manufacturing, hazardous materials storage, wastewater treatment, and similar uses.
Policy OCS-9.3: Comply with regional, state, and federal standards and programs for control of all airborne pollutants and noxious odors, regardless of source.
Policy OCS-9.4: Support the Riverside County Regional Air Quality Task Force, the Southern California Association of Government’s Regional Transportation Plan/Sustainable Communities Strategy, and the South Coast Air Quality Management District’s Air Quality Management Plan to reduce air pollution at the regional level.
Policy OCS-9.5: Comply with the mandatory requirements of Title 24 Part 1 of the California Building Standards Code (CALGreen) and Title 24 Part 6 Building and Energy Efficiency Standards.
Goal OSC-10: An environmentally aware community that is responsive to changing climate conditions and actively seeks to reduce local greenhouse gas emissions.
Policy OCS-10.1: Align the City’s local GHG reduction targets to be consistent with statewide GHG reduction target of AB 32.
Policy OCS-10.2: Align the City’s long term GH reduction goals consistent with the statewide GHG reduction goal of Executive Order S-03-05.
Policy OCS-10.3: Participate in regional greenhouse gas emission reduction initiatives.
Policy OCS-10.4: Consider impact to climate change as a factor in evaluation of policies, strategies, and projects.
Goals and policies from the Community Design Element applicable to the Project include:
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 196
Menifee Mayor and City Council
February 7, 2024
Page
582 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 86
Goal CD 1: A unified and attractive community identity that complements the character of the City’s distinctive communities.
Policy CD 1.1: Enhance the city's identity through the use of distinct city graphics, such as the city seal, in the design of gateways, street signs, city signage, public facilities and public gathering spaces, and other areas where appropriate.
Policy CD 1.2: Support the development and preservation of unique communities and rural and suburban neighborhoods in which each community exhibits a special sense of place and quality of design.
Policy CD 1.3: Strengthen the identity of individual neighborhoods/communities with entry monuments, flags, street signs, and/or special tree streets, landscaping, and lighting.
Goal CD 3: Projects, developments, and public spaces that visually enhance the character of the community and are appropriately buffered from dissimilar land uses so that differences in type and intensity do not conflict.
Policy CD 3.1: Preserve positive characteristics and unique features of a site during the design and development of a new project; the relationship to scale and character of adjacent uses should be considered.
Policy CD 3.2: Maintain and incorporate the city's natural amenities, including its hillsides, indigenous vegetation, and rock outcroppings, within proposed projects.
Policy CD 3.3: Minimize visual impacts of public and private facilities and support structures through sensitive site design and construction. This includes, but is not limited to appropriate placement of facilities; undergrounding, where possible; and aesthetic design (e.g., cell tower stealthing).
Policy CD 3.5: Design parking lots and structures to be functionally and visually integrated and connected; off-street parking lots should not dominate the street scene.
Policy CD 3.6: Locate site entries and storage bays to minimize conflicts with adjacent residential neighborhoods.
Policy CD 3.8: Design retention/detention basins to be visually attractive and well-integrated with any associated project and with adjacent land uses.
Policy CD 3.9: Utilize Crime Prevention through Environmental Design (CPTED) techniques and defensible space design concepts to enhance community safety.
Policy CD 3.10: Employ design strategies and building materials that evoke a sense of quality and permanence.
Policy CD 3.12: Utilize differing but complementary forms of architectural styles and designs that incorporate representative characteristics of a given area.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 197
Menifee Mayor and City Council
February 7, 2024
Page
583 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 87
Policy CD 3.13: Utilize architectural design features (e.g., windows, columns, offset roof planes, etc.) to vertically and horizontally articulate elevations in the front and rear of residential buildings.
Policy CD 3.14: Provide variations in color, texture, materials, articulation, and architectural treatments. Avoid long expanses of blank, monotonous walls or fences.
Policy CD 3.15: Require property owners to maintain structures and landscaping to high standards of design, health, and safety.
Policy CD 3.16: Avoid use of long, blank walls in industrial developments by breaking them up with vertical and horizontal I articulation achieved through stamping, colors, materials, modulation, and landscaping.
Policy CD 3.18: Require setbacks and other design elements to buffer residential units to the extent possible from the impacts of abutting roadway, commercial, agricultural, and industrial uses.
Policy CD-3.19: Design walls and fences that are well integrated in style with adjacent structures and terrain and utilize landscaping and vegetation materials to soften their appearance.
Policy CD-3.20: Avoid the blocking of public views by solid walls.
Policy CD-3.21: Use open space, greenways, recreational lands, and water courses as community separators.
Policy CD 3.22: Incorporate visual buffers, including landscaping, equipment and storage area screening, and roof treatments, on properties abutting either Interstate 215 or residentially designated property.
Goal CD 4: Recognize, preserve, and enhance the aesthetic value of the city's enhanced landscape corridors and scenic corridors.
Policy CD 4.1: Recognize, preserve, and enhance the aesthetic value of the city's enhanced landscape corridors and scenic corridors.
Policy CD 4.2: Design new and, when necessary, retrofit existing streets to improve walkability, bicycling, and transit integration; strengthen connectivity; and enhance community identity through improvements to the public right-of-way such as sidewalks, street trees, parkways, curbs, street lighting, and street furniture.
Policy CD 4.4: Frame views along streets through the use of wide parkways and median landscaping.
Policy CD 4.7: Design new landscaping, structures, equipment, signs, or grading within the scenic corridors for compatibility with the surrounding scenic setting or environment.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 198
Menifee Mayor and City Council
February 7, 2024
Page
584 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 88
Policy CD 4.8: Preserve and enhance view corridors by undergrounding and/or screening new or relocated electric or communication distribution lines, which would be visible from the city's scenic highway corridors.
Policy CD 4.9: Require specialized design review for development along scenic corridors, including but not limited to, building height restrictions, setback requirements, and site-orientation guidelines.
Policy CD-4.10: Seek to preserve and maintain, through acquisition or regulation, areas or sites that are found to have exceptional scenic value.
Goal CD 6: Attractive landscaping, lighting, and signage that conveys a positive image of the community.
Policy CD 6.1: Recognize the importance of street trees in the aesthetic appeal of residential neighborhoods and require the planting of street trees throughout the city.
Policy CD 6.2: Ensure that all public landscaping is adequately maintained.
Policy CD 6.4: Require property owners to maintain the existing landscape on developed nonresidential sites and replace unhealthy or dead landscaping.
Policy CD 6.5: Limit light leakage and spillage that may interfere with the operations of the Palomar Observatory.
Policy CD-6.6: Encourage the incorporation of lighting into signage design when appropriate in order to minimize glare and light spillage while accentuating the design of the signage.
Policy CD-6.7: Integrate project signage into the architectural design and character of new buildings.
Policy CD 6.8: Discourage the use of flashing, moving, or audible signs.
Goals and policies from the Economic Development Element applicable to the Project include:
Goal ED 1: A diverse and robust local economy capable of providing employment for all residents desiring to work in the city.
Policy ED 1.2: Diversify the local economy and create a balance of employment opportunities across skill and education levels, wages and salaries, and industries and occupations.
Policy ED 1.4: Provide sufficient infrastructure to serve the full build out of the city.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 199
Menifee Mayor and City Council
February 7, 2024
Page
585 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 89
Goal ED 3: A mix of land uses that generates a fiscal balance to support and enhance the community’s quality of life.
Policy ED 3.3: Utilize the following parameters on general plan amendments that are not part of a city-initiated comprehensive amendment or update:
Because retail uses provide retail sales taxes and lodging uses provide transient occupancy taxes, they provide the most lucrative fiscal balance. No general plan amendment changing from a land use designation that permits retail uses or lodging uses to a land use designation that does not allow retail or lodging uses shall be approved except in conjunction with a development agreement or other legally enforceable obligation on the property owner(s) that requires the subject property generate the same or better fiscal balance for the city as it would have generated with a retail or lodging use.
Because office and industrial uses generate less demand for public facilities and services than residential uses, they provide a more lucrative fiscal balance. No general plan amendment changing from a land use designation that permits office or industrial uses to a designation that does not permit office or industrial land uses shall be approved except in conjunction with a development agreement or other legally enforceable obligation on the property owner(s) that requires the subject property generate the same or better fiscal balance for the city as it would have generated with an office or industrial use.
The city may require a fiscal impact analysis and mitigation of any negative fiscal impacts for any requested general plan amendment.
Goals and policies from the Safety Element applicable to the Project include:
Goal S-1: A community that is minimally impacted by seismic shaking and earthquake-induced or other geologic hazards.
Policy S-1.1: Require all new habitable buildings and structures to be designed and built to be seismically resistant in accordance with the most recent California Building Code adopted by the City.
Goal S-2: A community that has used engineering solutions to reduce or eliminate the potential for injury, loss of life, property damage, and economic and social disruption caused by geologic hazards such as slope instability; compressible, collapsible, expansive or corrosive soils; and subsidence due to groundwater withdrawal.
Policy S-2.1: Require all new developments to mitigate the geologic hazards that have the potential to impact habitable structures and other improvements.
Policy S-2.2: Monitor losses caused by geologic hazards to existing development and require studies to specifically address these issues, including the implementation of measures designed to mitigate these hazards, in all future developments in these areas.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 200
Menifee Mayor and City Council
February 7, 2024
Page
586 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 90
Policy S-2.3: Minimize grading and modifications to the natural topography to prevent the potential for man-induced slope failures.
Policy S-2.4: Manage the groundwater resources in the area to prevent over-drafting of the aquifers, which in turn could result in regional subsidence.
Goal S-3: A community that is minimally disrupted by flooding and inundation hazards.
Policy S-3.1: Require that all new developments and redevelopments in areas susceptible to flooding (such as the 100-year floodplain and areas known to the City to flood during intense or prolonged rainfall events) incorporate mitigation measures designed to mitigate flood hazards.
Policy S-3.2: Reduce flood hazards in developed areas known to flood.
Policy S-3.4: Develop floodplains as parks, nature trails, equestrian parks, golf courses, or other types of recreational facilities or joint-use facilities that can withstand periodic inundation wherever feasible.
Goal S-4: A community that has effective fire mitigation and response measures in place, and as a result is minimally impacted by wildland and structure fires.
Policy S-4.1: Require fire-resistant building construction materials, the use of vegetation control methods, and other construction and fire prevention features to reduce the hazard of wildland fire. Ensure all new development and/or redevelopment in the LRA and VHFHSZ will comply with the California Fire Code (CFC) and California Building Code (CBC). All new development within the LRA Very High Fire zone will comply with Chapter 49 of the California Fire Code and Chapter 7A of the California Building Code.
Policy S-4.2: Ensure, to the maximum extent possible, that fire services, such as firefighting equipment and personnel, infrastructure, and response times, are adequate for all sections of the City. The City will continue to coordinate with the Riverside County Fire Department, for Interagency coordination, to respond to emergency calls in Menifee and to provide training and ongoing programs for public education.
Policy S-4.4: Review development proposals for impacts to fire facilities and compatibility with fire areas or mitigate.
Policy S-4.6: Coordinate with Eastern Municipal Water District to ensure adequate water availability for fire suppression. Policy S 4.10: Ensure all new residential development as well as all new development and redevelopment within the LRA and VHFHSZ will comply with the most current version of the California Building Codes and California Fire Code.
Policy S-4.8: When feasible locate new essential public facilities outside of high fire risk areas, including, but not limited to, hospitals and health care facilities, emergency shelters, emergency command centers, and emergency communications facilities, or identifying construction methods Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 201
Menifee Mayor and City Council
February 7, 2024
Page
587 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 91
or other methods to minimize damage if these facilities are located in a state responsibility area or VHFHSZ.
Policy S-4.10: Ensure all new residential development as well as new development and redevelopment within the LRA and VHFHSZ will comply with the most current version of the California Building Codes and California Fire Code.
Policy S-4.14: All new parcel maps and tentative maps in the LRA, SRA, and VHFHSZ shall provide two points of access to the project in conformance with the California Building Code and California Fire Code and CA GC 65302 (g)(5). Approval of parcel maps and tentative maps in LRAs, SRAs or VHFHSZs is conditional based on meeting the SRA Fire Safe Regulations and the Fire Hazard Reduction Around Buildings and Structures Regulations, particularly those regarding road standards for ingress, egress, and fire equipment access. (See Gov. Code, § 66474.02.).
Policy S-4.17: The City should ensure that all new development has adequate water, sewer, and fire protection consistent with the most current California Building Code and California Fire Code and will comply with the Board of Forestry and Fire Protection Fire Safe Regulations.
Goal S-5: A community that has reduced the potential for hazardous materials contamination.
Policy S-5.1: Locate facilities involved in the production, use, storage, transport, or disposal of hazardous materials away from land uses that may be adversely impacted by such activities and areas susceptible to impacts or damage from a natural disaster.
Policy S-5.2: Ensure that the Fire Department can continue to respond safely and effectively to a hazardous materials incident in the city, whether it is a spill at a permitted facility, or the result of an accident along a section of the freeway or railroads that extend across the city.
Policy S-5.3: Continue to support the operation of programs and recycling centers that accept hazardous substances, such as paint, paint thinner, used waste oil, etc.
Policy S-5.4: Ensure that all facilities that handle hazardous materials comply with federal and state laws pertaining to the management of hazardous wastes and materials.
Policy S-5.5: Require facilities that handle hazardous materials to implement mitigation measures that reduce the risks associated with hazardous material production, storage, and disposal.
Policy S-5.6: Require all new industrial development projects and significant rehabilitation or expansion projects to reduce industrial truck idling by enforcing California’s five-minute maximum law, requiring warehouse and distribution facilities to provide adequate on-site truck parking, and requiring refrigerated warehouses to provide generators for refrigerated trucks. Require air pollution point sources to be located at safe distances from sensitive sites such as homes and schools.
Goal S 7: A community that has protected its sensitive structures, functions, and populations from the risks associated with climate change.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 202
Menifee Mayor and City Council
February 7, 2024
Page
588 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 92
Policy S 7.1: Continue to require environmental analysis for proposed projects which may produce harmful levels of greenhouse gas.
Policy S 7.3: Coordinate with energy providers to ensure reliable energy availability for the City’s residents.
Policy S 7.9: Promote drought resistant landscaping to continue reducing water consumption and potential fuel sources.
Goals and policies from the Noise Element applicable to the Project include:
Goal N 1: Noise-sensitive land uses are protected from excessive noise and vibration exposure.
Policy N 1.1: Assess the compatibility of proposed land uses with the noise environment when preparing, revising, or reviewing development project applications.
Policy N 1.2: Require new projects to comply with the noise standards of local, regional, and state building code regulations, including but not limited to the city's Municipal Code, Title 24 of the California Code of Regulations, the California Green Building Code, and subdivision and development codes.
Policy N 1.3: Require noise abatement measures to enforce compliance with any applicable regulatory mechanisms, including building codes and subdivision and zoning regulations, and ensure that the recommended mitigation measures are implemented.
Policy N 1.6: Coordinate with the County of Riverside and adjacent jurisdictions to minimize noise impacts from adjacent land uses along the city's boundaries, especially its rural edges.
Policy N 1.7: Mitigate exterior and interior noises to the levels listed in Table N-1 of the Noise Element to the extent feasible, for stationary sources adjacent to sensitive receptors.
Policy N 1.8: Locate new development in areas where noise levels are appropriate for the proposed uses. Consider federal, state, and city noise standards and guidelines as a part of new development review.
Policy N 1.9: Limit the development of new noise-producing uses adjacent to noise-sensitive receptors and require that new noise-producing land be designed with adequate noise abatement measures.
Policy N 1.10: Guide noise-tolerant land uses into areas irrevocably committed to land uses that are noise-producing, such as transportation corridors adjacent to the I-215 or within the projected noise contours of any adjacent airports.
Policy N 1.11: Discourage the siting of noise-sensitive uses in areas in excess of 65 dBA CNEL without appropriate mitigation.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 203
Menifee Mayor and City Council
February 7, 2024
Page
589 of 1677
CI T Y O F ME N I F E E
ME N I F E E VA L L E Y SP E C I F I C PL A N
FI N D I N G S O F FA C T A N D ST A T E M E N T O F OV E R R I D I N G CO N S I D E R A T I O N S JA N U A R Y 2 0 2 4
January 2024 Findings of Fact 93
Policy N 1.12: Minimize potential noise impacts associated with the development of mixed-use projects (vertical or horizontal mixed-use) where residential units are located above or adjacent to noise-generating uses.
Policy N 1.13: Require new development to minimize vibration impacts to adjacent uses during demolition and construction.
Policy N 1.14: Minimize vibration impacts on people and businesses near light and heavy rail lines or other sources of ground-borne vibration through the use of setbacks and/or structural design features that reduce vibration to levels at or below the guidelines of the Federal Transit Administration. Require new development within 100 feet of rail lines to demonstrate, prior to project approval, that vibration experienced by residents and vibration-sensitive uses would not exceed these guidelines.
Policy N 1.15: Employ noise mitigation practices and materials, as necessary, when designing future streets and highways, and when improvements occur along existing road segments.
Mitigation measures should emphasize the establishment of natural buffers or setbacks between the arterial roadways and adjoining noise-sensitive areas.
Policy N 1.17: Prevent the construction of new noise-sensitive land uses within airport noise impact zones. New residential land uses within the 65 dB CNEL contours of any public-use or military airports, as defined by the Riverside County Airport Land Use Commission, shall be prohibited.
Policy N 1.18: Work with the Southern California Regional Rail Authority and railroad owners and operators to reduce the noise impacts on noise-sensitive uses adjacent to railroad tracks.
Policy N 1.20: Adhere to any applicable Riverside County Airport Land Use Commission land use compatibility criteria, including density, intensity, and coverage standards.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 204
Menifee Mayor and City Council
February 7, 2024
Page
590 of 1677
4-1
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23)
4.0 MITIGATION MONITORING AND REPORTING PROGRAM
4.1 MITIGATION MONITORING REQUIREMENTS
Public Resources Code (PRC) Section 21081.6 (enacted by the passage of Assembly Bill 3180) mandates that where significant effects have been identified, the following requirements shall apply to all reporting or mitigation monitoring programs:
• The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes that have been required or incorporated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead agency or a responsible agency, prepare and submit a proposed reporting or monitoring program.
• The lead agency shall specify the location and custodian of the documents or other materials that constitute the record of proceedings upon which its decision is based. • A public agency shall provide measures to mitigate or avoid significant effects on the environment that are fully enforceable through permit conditions, agreements, or other measures. Conditions of project approval may be set forth in referenced documents that address required mitigation measures or, in the case of the adoption of a plan, policy, regulation, or other project, by incorporating the mitigation measures into the plan, policy, regulation, or project design.
• Prior to the close of the public review period for a Draft Environmental Impact Report (EIR), a responsible agency, or a public agency having jurisdiction over natural resources affected by the project, shall either (1) submit to the lead agency complete and detailed performance objectives for mitigation measures that would address the significant effects on the environment identified by the responsible agency or agency having jurisdiction over natural resources affected by the project, or (2) refer the lead agency to appropriate, readily available guidelines or reference documents. Any mitigation measures submitted to a lead agency by a responsible agency or an agency having jurisdiction over natural resources affected by the project shall be limited to measures that mitigate impacts to resources that are subject to the statutory authority of, and definitions applicable to, that agency. Compliance or noncompliance with that requirement by a responsible agency or agency having jurisdiction over natural resources affected by a project shall not limit the authority of the responsible agency or agency having jurisdiction over natural resources affected by a project, or the authority of the lead agency, to approve, condition, or deny projects as provided by this division or any other provision of law.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 205
Menifee Mayor and City Council
February 7, 2024
Page
591 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 4-2
4.2 MITIGATION MONITORING PROCEDURES
The mitigation monitoring and reporting program has been prepared in compliance with PRC Section 21081.6. It describes the requirements and procedures to be followed by the City of Menifee (City) to ensure that all mitigation measures adopted as part of the proposed Menifee Valley Specific Plan (proposed Project) will be carried out as described in the Final EIR.
Table 7.A in Chapter 7.0, Mitigation Monitoring and Reporting Program, of the Draft EIR lists each of the mitigation measures (MM) and regulatory compliance measures (RCM) specified in the Draft EIR and identifies the party or parties responsible for implementation and monitoring of each measure.
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 206
Menifee Mayor and City Council
February 7, 2024
Page
592 of 1677
4-3
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials
4.1 Aesthetics
Refer to RCM HAZ-2, below.
4.2 Agriculture and Forestry Resources
There are no significant impacts related to agriculture and forestry resources. No mitigation is required.
4.3 Air Quality
MM AIR-1: During construction of the on-site improvements associated with the proposed Project, the Project contractor shall ensure all 50 horsepower or more off-road diesel-powered construction equipment is powered with California Air Resources Board (CARB)-certified Tier 4 Final engines or the equivalent, except where the Project Applicant establishes to the satisfaction of the City of Menifee (City) that Tier 4 Fina l equipment is not available. An exemption from these requirements may be granted by the City if the City documents that equipment with the required tier is not reasonably available within Southern California and co rresponding reductions in criteria air pollutant emissions are achieved from other construction equipment to the extent feasible.
During construction activities. Construction Contractor / City of Menifee MM AIR-2: Prior to issuance of building permits, the City of Menifee shall identify Project design details and specifications, where feasible, to document implementation and compliance with the following emission reduction measures. Implementation of the following measures is considered to be applicable, feasible, and effective in reducing criteria pollutant emissions generated by the Project:
• All Project Applicants shall consider all feasible alternatives to minimize emissions from diesel equipment (e.g., trucks, co nstruction equipment, and generators).
• For high density and mixed-use developments, Project Applicants shall consult with the local transit agency and incorporate all appropriate and feasible transit amenities into the plans, consistent with Section 3.1.4 Bus Rail and Transit Options in the Menifee Valley Specific Plan. • All Project Applicants shall implement walkable neighborhoods by siting parks and community centers near residential areas consistent with Section 2 Land Use Designations and Planning Areas in the Menifee Valley Specific Plan. • All Project Applicants shall incorporate fuel -efficient heating equipment and other appliances, such as water heaters, swimming pool heaters, cooking equipment, refrigerators, furnaces, boiler units, and low or zero -emitting architectural coatings. Project Applicants shall utilize only Energy Star heating, cooling, and lighting devices, and appliances, consistent with CALGreen requirements applicable at time of development applications.
• All Project Applicants shall utilize energy-efficient design features, including appropriate site orientation, use of lighter color roofing and building materials, and use of deciduous shade trees and windbreak trees to reduce fuel consumption for heating and cooling. • All Project Applicants shall provide bicycle parking/storage facilities on site. Bicycle parking facilities should be near de stination points and easy to find. At least one bicycle parking space for every 20 vehicle parking spaces should be provided. • All Project Applicants shall install Class I or II bike lanes on arterial/collector streets, or where a suitable route exists consistent with Figure 3- 7 Bicycle Mobility Plan of the Menifee Valley Specific Plan. • All Project Applicants shall provide building access and paths which are physically separated from street parking lot traffic and that eliminate physical barriers such as walls, berms, landscaping and slopes that impede the use of pedestrians, bicycle facilities, or public transportation vehicles.
• All Project Applicants shall provide continuous sidewalks separated from the roadway by landscaping and on-street parking where provided, consistent with Section 3.1.1, Roadway Design Standards, Section 3.2.1, Pedestrian Mobility, and Figure 3 -7 Bicycle Mobility Plan of the Menifee Valley Specific Plan.
• All Project Applicants shall link cul-de-sacs and dead-end streets to encourage pedestrian and bicycle travel. • All Project Applicants shall provide traffic reduction modifications to residential roads, such as: narrower streets, speed p latforms, bulb- outs, and intersection modifications designed to reduce vehicle speeds and to encourage pedestrian and bicycle travel. • For all parking lots, Project Applicants shall provide a parking lot design that includes clearly marked and shaded pedestria n pathways between transit facilities and building entrances.
• All Project Applicants shall provide pedestrian access between bus service and major transportation points and to destination points within the Project.
• For all high-density residential, mixed-use, business/commercial park, and commercial uses, Project Applicants shall provide a display case Prior to issuance of building permits. Construction Contractor / City of Menifee Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 207
Menifee Mayor and City Council
February 7, 2024
Page
593 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 4-4 Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials or kiosk displaying transportation information in a prominent area accessible to employees, residents, or visitors such as bi ke route maps, bus schedules, and carpooling and car sharing in a prominent area accessible to employees, residents, or visitors. • For all high-density residential, mixed-use, business/commercial park, and commercial uses, Project Applicants shall provide a display case or kiosk displaying transportation information in a prominent area accessible to employees, residents, or visitors such as bi ke route maps, bus schedules, and carpooling and car sharing in a prominent area accessible to employees, residents, or visitors. • All Project Applicants shall design street block patterns consistent with the Menifee Valley Specific Plan and City of Menife e Standards and Ordinances.
• For all mixed -use, business/commercial park, and commercial uses Project Applicants shall provide preferential parking spaces near the entrance of buildings for those who carpool/vanpool/rideshare and provide signage. • All Project Applicants shall improve the thermal integrity/efficiency of buildings and reduce the thermal load with automated and timed temperature controls or occupant sensors.
• Project Applicants for manufacturing and light industrial uses that require refrigerated vehicles, shall install an adequate number of electrical service connections at loading docks for plugging in the anticipated number of refrigerated trailers to reduce idl ing time and emissions.
• Project Applicants for manufacturing and light industrial uses shall consider energy storage and combined heat and power in a ppropriate applications to optimize renewable energy generation systems and avoid peak energy use. • Project Applicants for manufacturing and light industrial uses with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with CARB Rule 2845 (13 Ca lifornia Code of Regulations [CCR] Chapter 10, Section 2485).
• Project Applicants shall install 240 -volt electrical outlets or Level 3 chargers in parking lots that would enable charging of neighborhood electric vehicles (NEVs) and/or battery powered vehicles. • Project Applicants shall maximize use of solar energy including solar panels, including installing the maximum possible numbe r of solar energy arrays on the building roofs to generate solar energy. • Project Applicants shall maximize the planting of trees in landscaping and parking lots, consistent with the Menifee Valley Specific Plan and City of Menifee Standards and Ordinances.
• Project Applicants shall use light-colored paving and roofing materials. • Project Applicants shall install outdoor electrical outlets to promote the use of electric lawn mowers and leaf blowers.
MM AIR-3: Prior to issuance of building permits, Project Applicants/Developers shall provide plans that indicate a heating, ventilation, and air conditioning (HVAC) system with a control efficiency sufficient to result in a reduction of a minimum 89 percent of particulates of 10 mic rons or less, such as Minimum Efficiency Reporting Value (MERV) -13 filters or greater, for indoor air filtration systems. The ventilation system shall be certified to achieve the stated performance effectiveness from indoor areas.
Prior to issuance of building permits. Project Applicants / City of Menifee Refer to MM TRA-1, below.
4.4 Biological Resources
MM BIO-1: Prior to issuance of any grading or construction permits, the applicant shall provide payment to the City of Menifee Communit y Development Department for applicable Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) Local Development Mitigation Fees.
The Local Development Mitigation Fees are subject to change each fiscal year. as such, the Applicant shall pay the current fee amounts according to timing outlined by the Western Riverside County Regional Conservation Authority (RCA). The Applicant shall pay the current fee amounts regarding roadways prior to approval of the Improvement Plan. The Applicant shall pay the current fee amoun ts regarding residential, commercial and industrial uses, prior to building permit issuance.
Prior to issuance of any grading, construction,
or building permits.
Project Applicant / City of Menifee
Community Development Department
MM BIO-2: Prior to issuance of any grading permits, the City of Menifee Community Development Department shall confirm that the constru ction plans indicate that vegetation, including suitable nesting habitat for birds, shall be removed outside the bird nesting season (Feb ruary 15 through August 31). If vegetation cannot be removed outside the bird nesting season (February 15 through August 31), nesting bird sur veys shall be conducted within 3 days prior to project ground disturbance or vegetation removal to ensure th at nesting birds protected under the Migratory Bird Treaty Act (MBTA) and California Fish and Game Code are not disturbed by construction -related activities (i.e., brush clearing and noise). If nesting birds are documented on or in the immediate vicinity (within approximately 300 feet) of the project site, no construction or clearing shall Prior to issuance of any grading permits. Project Applicant / City of Menifee, Community Development Department
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 208
Menifee Mayor and City Council
February 7, 2024
Page
594 of 1677
4-5
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials be conducted within an appropriate avoidance buffer surrounding the active nest(s), as determined by a qualified biologist, u ntil the project biologist determines that the young have fledged or the nest is no longer active.
MM BIO-3: A qualified biologist shall conduct a pre-construction presence/absence survey for burrowing owls within 30 days prior to site disturbance. Proof of this pre-construction survey shall be provided for approval to the City of Menifee Community Development Department prior to issuance of any grading permits. If burrowing owls are documented on site, the owls shall be relocated/excluded from the site outside of the breeding season following accepted protocols, as specified in MSHCP Section 6.3.2.
Within 30 days prior of site disturbing
construction activities and prior to the issuance
of any grading permits.
Qualified Biologist / City of Menifee,
Community Development Department
MM BIO-4: Prior to issuance of any grading permits, the City of Menifee Community Development Department shall confirm that the project applicant has paid the fees pursuant to Ordinance 663.10 for the Stephens’ kangaroo rat (SKR) Habitat Conservation Plan (HCP) Fee Assessment Area.
Prior to issuance of any grading permits. Project Applicant / City of Menifee, Community Development Department
MM BIO-5: Prior to any ground -disturbing activity near jurisdictional features on -site, the project applicant shall provide proof to the City of Menifee Community Development Department that applicable permits have been obtained through the Regional Water Quality Control Board (RWQCB) and the California Department of Fish and Wildlife (CDFW) and that permit conditions/mitigation has been fully satisfied for impacts to jurisdictional features. Based on the results of the on -site jurisdictional delineation for the prop osed project, the proposed project would permanently impact 1.93 acres of RWQCB jurisdictional nonwetland waters of the State and CDFW jurisdictional unvegetated stre ambed (i.e., Feature 1 and Feature 2), and 0.03 acre of RWQCB jurisdictional wetland waters of the State and CDFW-jurisdictional associated wetland habitat (i.e., Feature 2 Wetland). The proposed mitigation strategy for on-site impacts shall be the purchase of 2.94 acres of rehabilitation credits (1.5:1 mitigation ratio; 1.93 acres + 0.03 acre = 1.96 X 1.5 ratio = 2.94 acres of mitigation) from the Riverpark Mitigation Bank. Alternatively, on -site impacts shall be mitigated with the purchase of 3.92 acres of preservation credits (2:1 mitigation ratio; 1.93 acres + 0.03 a cre = 1.96 X 2 ratio =
3.92 acres of mitigation) from the Barry Jones Skunk Hollow Preservation Bank.
The project applicant shall mitigate direct impacts on an additional 0.25 acres of streambed Waters of the State (WOS)/MSHCP riverine features by purchasing an additional 0.38 acres of rehabilitation credits (1.5:1 mitigation ratio) at the Riverpark Mitigation Bank to satisfy anticipated CDFW 1602 and/or RWQCB mitigation requirements. The proposed project would permanently impact 0.17 acre (Feature 5) and 0.08 acre (Feature 4, Feature 6, Feature 7, Feature 8, and Feature 9) of Ephemeral Streambed – Disturbed, which are found in off -site roadway improvement areas. The 1.5:1 ratio of mitigation was previously approved by the Wildl ife Agencies following the field visit via email correspondence (Appendix D-7). Alternatively, the project applicant can also offset the additional 0.25 acres of streambed Waters of the State (WOS)/MSHCP riverine features (Feature 4, Feature 5, Feature 6, Feature 7, Feature 8, Feature 9), which are found in off -site roadway improvement areas, by purchasing an additional 0.5 acres of preservation credits at Barry Jones Skunk Hollow or another CDFW -approved mitigation bank within Riverside County at a 2:1 mit igation ratio. This option of mitigation shall also provide biologically equivalent or superior preservation. Notification of Streambed Alteration to CDFW shall be provided to justify the purchasing of credits and mitigat ion used for the Project Site. In total, the project applicant shall purchase 0.38 acres of rehabilitation credits or 0.5 acres of preservatio n credits. The proposed mitigation strategy for off-site roadway improvement area impacts shall be the purchase of 0.38 acre of rehabilitation credit s (1.5:1 mitigation ratio; 0.17 acre + 0.08 acre = 0.25 acre X 1.5 ratio = 0.38 acre of mitigation) from the Riverpark Mitigation Bank. Alternati vely, off-site roadway improvement area impacts shall be mitigated with the purchase of 0.50 acre of preservation credits (2:1 mitigation ratio; 0.17 acre + 0.08 acre =
0.25 acre X 2 ratio = 0.50 acre of mitigation) from the Barry Jones Skunk Hollow Preservation Bank.
The Applicant shall be obligated to implement/comply with the permit conditions and mitigation measures required by the resou rce agencies regarding impacts on their respective jurisdictions. The proposed mitigation strategy shall prioritize in -kind and in -watershed options per the regulatory agencies’ preferences. The regulatory agencies shall make the final determination of the final compensatory mitigation requirements during the permit evaluation process.
Prior to any ground -disturbing activity near jurisdictional aquatic resources in off -site improvement areas, the project applicant shall provide proof to the City of Menifee Community Development Department that applicable permits have been obtained through the RWQCB an d the CDFW for impacts on jurisdictional aquatic resources. Based on the results of the off-site jurisdictional delineation for the proposed project, the proposed project would permanently impact 0.32 acre of vegetated streambed (i.e., Feature 1, Feature 3, Feature 3A, Feature 4 , and Feature 4A). The proposed mitigation strategy for off-site impacts shall be the purchase of 0.48 acre of rehabilitation credits (1.5:1 mitigation ratio; 0.32 acre X 1.5 ratio = 0.48 acre of mitigation) from the Riverpark Mitigation Bank. Alternatively, off-site impacts shall be mitigated with the purchase of 0.64 acre of preservation credits (2:1 mitigation ratio; 0.32 acre X 2 ratio = 0.64 acre of mitigation) from the Barry Jon es Skunk Hollow Preservation Bank. Additionally, the jurisdictional determination request forms shall be submitted to the United States Army Corps of Engineers (USACE) to confirm tha t no jurisdictional waters of the United States occur within the off -site improvements footprint. Should the USACE not agree with the findings of the request forms and determine that jurisdictional waters of the United States occur within the off-site improvements footprint (i.e., the USACE does not issue an AJD confirming that none of the features are USACE jurisdictional resources), applicable permits shall be obtained through the USACE for impacts on jurisdictional aquatic resources. The Applicant shall implement/comply with all permit conditions and mitigation measures required by the resource agencies. Compensatory mitigation to offset impacts on jurisdictional aquati c resources may Prior to the commencement of any ground-
disturbing activity near on- or off-site
jurisdictional features.
Project Applicant / City of Menifee,
Community Development Department
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 209
Menifee Mayor and City Council
February 7, 2024
Page
595 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 4-6 Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials be implemented through off -site, permittee-responsible mitigation; in -lieu fee program or mitigation bank credit purchase (e.g., Riverpark Mitigation Bank); or a combination of these options depending on availability. The proposed mitigation strategy shall priorit ize in-kind and in - watershed options per the regulatory agencies’ preferences. The regulatory agencies shall make the final determination regarding compensatory mitigation requirements during the permit evaluation process.
The proposed project will impact a total of 2.53 acres of aquatic resources for project site improvements, off -site improvements, and off -site roadway improvements. Total mitigation required shall be 3.8 acres of rehabilitation credits (1.5:1 mitigation ratio) from the Riverpark Mitigation Bank for project site improvements, off -site improvements, and off -site roadway improvements. Alternatively, project site improvements, off - site improvements, and off-site roadway improvements shall be mitigated with the purchase of 5.06 acres of preservation credits (2:1 mitigation ratio) from the Barry Jones Skunk Hollow Preservation Bank.
4.5 Cultural Resources
MM CUL-1: Prior to the construction of any bridge structure over the existing San Jacinto Valley Railroad, the developer shall submit evidence to the City for review and approval that any such construction activity avoids the existing rail feature. Furthermore, prior to any bridge co nstruction, the developer shall submit to the City for review and approval plans detailing (but not limited to) the location, orientation, de sign, and/or materials proposed for any bridge construction to ensure bridge features to not adversely affect the integrity of the existing rail feature.
Prior to the construction of any bridge
structure over the existing San Jacinto Valley
Railroad.
Developer / City of Menifee
RCM CUL-1: Inadvertent Archaeological Find. If during ground-disturbance activities, unique cultural resources are discovered that were not assessed by the archaeological report(s) and/or environmental assessment conducted prior to project approval, the following procedures shall be followed.
Unique cultural resources are defined, for this condition only, as being multiple artifacts in close association with each ot her, but may include fewer artifacts if the area of the find is determined to be of significance due to its sacred or cultural importance as deter mined in consultation with the Native American Tribe(s).
All ground disturbance activities within 100 feet of the discovered cultural resources shall be halted until a meeting is con vened between the developer, the archaeologist, the tribal representative(s) and the Community Development Director to discuss the significance of the find.
At the meeting, the significance of the discoveries shall be discussed and after consultation with the tribal representative( s) and the archaeologist, a decision shall be made, with the concurrence of the Community Development Director, as to the appropriate mi tigation (documentation, recovery, avoidance, etc.) for the cultural resources.
Grading of further ground disturbance shall not resume within the area of the discovery until an agreement has been reached by all parties as to the appropriate mitigation. Work shall be allowed to continue outside of the buffer area and will be monitored by additional Tribal monitors if needed.
Treatment and avoidance of the newly discovered resources shall be consistent with the Cultural Resources Management Plan (CR MP) and Monitoring Agreements entered into with the appropriate tribes. This may include avoidance of the cultural resources through project design, in- place preservation of cultural resources located in native soils and/or reburial on the Project property so they are not subj ect to further disturbance in perpetuity as identified in Non-Disclosure of Reburial Condition.
If the find is determined to be significant and avoidance of the site has not been achieved, a Phase III data recovery plan shall be prepared by the Project archeologist, in consultation with the Tribe, and shall be submitted to the City for review and approval prior to imp lementation of the said plan.
Pursuant to Calif. Pub. Res. Code § 21083.2(b) avoidance is the preferred method of preservation for archaeological resources and cultural resources. If the landowner and the Tribe(s) cannot agree on the significance or the mitigation for the archaeological or cultural resources, these issues will be presented to the City Community Development Director for decision. The City Community Development Director sha ll make the determination based on the provisions of the California Environmental Quality Act with respect to archaeological resources, recommendations of the Project archaeologist and shall take into account the cultural and religious pri nciples and practices of the Tribe. Notwithstanding any other rights available under the law, the decision of the City Community Development Director shall be appealable to the City Plann ing Commission and/or City Council.
During ground-disturbing construction
activities.
Construction Contractor / City of Menifee,
Community Development Department
RCM CUL-2: Archaeologist Retained. Prior to issuance of a grading permit the Project applicant shall retain a Riverside County qualified archaeologist to monitor all ground-disturbing activities in an effort to identify any unknown archaeological resources.
The Project Archaeologist and the Tribal monitor(s) shall manage and oversee monitoring for all initial ground -disturbing activities and excavation of each portion of the Project site including clearing, grubbing, tree removals, mass or rough grading, trenching, stockpiling of materials, rock crushing, structure demolition, etc. The Project Archaeologist and the Tribal monitor(s), shall have the auth ority to temporarily divert, redirect or halt the ground -disturbance activities to allow identification, evaluation, and potential recovery of cultural resources in Prior to issuance of any grading permits.
During initial ground-disturbing construction
activities and excavation of each portion of the
Project site including grubbing, tree removals,
mass or rough grading, trenching, stockpiling of
materials, rock crushing, structure demolition,
Project Archaeologist and Tribal Monitor(s) /
City of Menifee, Community Development
Department
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 210
Menifee Mayor and City Council
February 7, 2024
Page
596 of 1677
4-7
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials coordination with any required special-interest or tribal monitors.
The developer/permit holder shall submit a fully executed copy of the contract to the Community Development Department to ens ure compliance with this condition of approval. Upon verification, the Community Development Department shall clear this condition.
In addition, the Project Archaeologist, in consultation with the Consulting Tribe(s), the contractor, and the City, shall develop a Cultural Resources Management Plan (CRMP) in consultation pursuant to the definition in AB 52 to address the details, timing and responsibility of all archaeological and cultural activities that will occur on the Project site. A consulting tribe is defined as a tribe that initiated the AB 52 tribal consultation process for the Project, has not opted out of the AB 52 consultation process, and has completed AB 52 consultation with the City as p rovided for in Cal Pub Res Code Section 21080.3.2(b)(1) of AB 52. Details in the Plan shall include:
• Project grading and development scheduling.
• The Project archaeologist and the Consulting Tribes(s) shall attend the pre-grading meeting with the City, the construction manager and any contractors and will conduct a mandatory Cultural Resources Worker Sensitivity Training to those in attendance. The Training will include a brief review of the cultural sensitivity of the Project and the surrounding area; what resources could potentially be identif ied during earthmoving activities; the requirements of the monitoring program; the protocols that apply in the event inadvertent discove ries of cultural resources are identified, including who to contact and appropriate avoidance measures until the find(s) can be properly evaluated; and any other appropriate protocols. All new construction personnel that will conduct earthwork or grading activities that begin work on the Project following the initial Training must take the Cultural Sensitivity Training prior to beginning work and the Project archaeologist and Consulting Tribe(s) shall make themselves available to provide the training on an as-needed basis. • The protocols and stipulations that the contractor, City, Consulting Tribe(s) and Project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resources evaluation.
etc.
RCM CUL-3: Archaeology Report – Phase III and IV. Prior to final inspection, the developer/permit holder shall prompt the Project Archaeologist to submit two copies of the Phase III Data Recovery report (if required for the Project) and the Phase IV Cultural Resources Monitoring Report that complies with the Community Development Department’s requirements for such reports. The Phase IV report shall include evidenc e of the required cultural/historical sensitivity training for the construction staff held during the pre -grade meeting. The Community Development Department shall review the reports to determine adequate mitigation compliance. Provided the reports are adequate, the Commu nity Development Department shall clear thi s condition. Once the report(s) are determined to be adequate, two copies shall be submitted to the Eastern Information Center (EIC) at the University of California Riverside (UCR) and one copy shall be submitted to the Consu lting Tribe(s) Cultural Resources Department(s).
Prior to final inspection. Project Archaeologist / City of Menifee, Community Development Department
RCM CUL-4: If human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to Public Resources Code Section 5097.98(b), r emains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Rive rside County Coroner determines the remains to be Native American, the Native American Heritage Commission shall be contacted within 24 hours. Subsequently, the Native American Heritage Commission shall identify the “most likely descendant.” The most likely descendant shall then make recommendations and engage in consultation concerning the treatment of the remains as provided in Public Resources Code Section 5097.98. This measure shall be implemented to the satisfaction of the County.
During construction activities. Construction Contractor and County Coroner / City of Menifee
RCM CUL-5: The site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The County Coroner, pursuant to the specific exemption set fort h in California Government Code 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code 6254 (r). This measure shall be implemented to the satisfac tion of the City Planning Department.
During construction activities.
Construction Contractor and County Coroner
/ City of Menifee, Planning Department
Refer to RCM TCR-1 through RCM TCR-4.
4.6 Energy
There are no significant impacts related to energy. No mitigation is required.
4.7 Geology and Soils
RCM GEO-1: California Building Code Compliance Seismic Standards. All structures shall be designed in accordance with the seismic parameters presented in the Geotechnical Evaluations prepared for this Project (LGC Geotechnical, Inc., 2018, 2020, and 2021) and applicable sections of the most current California Building Code (CBC). Prior to the issuance of building permits for planned structures, the Soils Engineer and the City of Menifee Chief Building Official, or designee, shall review building plans to verify that the structural design conforms to the requirements of the Geotechnical Prior to the issuance of building permits for
planned structures.
During construction activities.
Construction Contractor and Soil Engineer /
City of Menifee, Chief Building Official, or
designee
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 211
Menifee Mayor and City Council
February 7, 2024
Page
597 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 4-8 Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials Evaluations, the most current CBC, and the City’s Municipal Code.
RCM GEO-2: Prior to the issuance of grading and/or building permits, the Applicant shall provide evidence to the City for review and app roval that proposed structures, features, and facilities to be constructed on the Project site have been designed and will be constructed in conf ormance with applicable provisions of the most current edition of the California Building Code in effect at the time of development applic ation submittal and that the Final Geotechnical Assessment’s recommendations conform to the most current California Building Code. Additionally, the Applicant shall provide evidence to the City that the recommendations cited in the project -specific Final Geotechnical Assessment are incorporated into project plans and/or implemented as deemed appropriate by the City. The Final Geotechnical Assessment recommendations may inc lude, but are not limited to, removal of existing vegetation, utilities, and any other surface and subsurface improvements that would n ot remain in place for use with the structures constructed on the Project site. Remedial earthwork, overexcavation, and ground improvement shall occur to depths specified in the Final Geotechnical Assessment to provide a sufficient layer of engineered fill or densified soil beneath str uctural footings/foundations, as well as proper surface drainage devices and erosion control. Retaining wall parameters shall be in accordance with the Final Geotechnical Assessment to protect against lateral spreading and on -site landslides. Construction of concrete structures in contact with subgrade soils determined to be corrosive shall include measures to protect concrete, steel, and other metals. Verification t esting must be performed upon completion of ground improvements to confirm that the compressible soils have been sufficiently densified. The structural engineer must determine the ultimate thickness and reinforcement of the building flood slabs based on the imposed slab loadin g. The recommendations of the Final Geotechnical Assessment shall be implemented to the satisfac tion of the City’s Building and Safety Director or designee.
Prior to the issuance of grading and/or building
permits for planned structures.
During construction activities.
Construction Contractor and Soil Engineer /
City of Menifee, Building and Safety Director,
or designee
RCM GEO-3: Prior to the start of construction, all field personnel shall be briefed regarding the types of fossils that could be found in the Project area and the procedures to follow should paleontological resources be encountered. This training shall be accomplished at the pre -grade kickoff meeting or morning tailboard meeting and shall be conducted by the Project Paleontologist or his/her representative. Specifically, the training shall provide a description of the fossil resources that may be encountered in the Project area, outline steps to follow in the event that a fossil discovery is made, and provide contact information for the Project Paleontologist and on -site monitor(s). The training shall be developed by the P roject Paleontologist and may be conducted concurrently with other environmental training (cultural and natural resources awareness training, safety training, etc.).
Prior to the start of construction, at the pre-
grade kickoff meeting or morning tailboard
meeting.
Project Paleontologist / City of Menifee
RCM GEO-4: Prior to the commencement of ground-disturbing activities, a qualified professional paleontologist shall be retained to prepare and implement a Paleontological Resource Impact Mitigation Program (PRIMP) for the Project. Initially, full -time monitoring is recommended for grading and excavation activities 4 feet below ground surface that will disturb previously undisturbed Quaternary older alluvium (Qof). D ue to soil development and previous agricultural disturbances, monitoring shall not be required in Project areas where construction acti vities disturb native sediments at depths less than 4 feet below ground surface. Spot -checking may occur in previously undisturbed young alluvia l deposits (Qya) in order to determine if Project activities are impacting the underlying highly sensitive Pleistocene units. Monitoring shall not be required in Project areas underlain by geologic units with no paleontological resource potential (i.e., the granodiorite to tonalite, Kdvg).
Monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that a paleonto logical resource is discovered, the monitor shall have the authority to divert temporarily the construction equipment around the find until it is assessed for scientific significance and collected. In areas of high sensitivity, monitoring efforts can be reduced or eliminated at the d iscretion of the Project Paleontologist if no fossil resources are encountered after 50 percent of the excavations are completed.
Prior to the commencement of any ground-
disturbing construction activities.
Project Paleontologist / City of Menifee
RCM GEO-5: Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laborat ory to a point ready for curation. Preparation shall include the careful removal of excess matrix from fossil materials and stabilizing and repair ing specimens, as necessary. Following laboratory work, all fossil specimens shall be identified to the lowest taxonomic level, cataloged, analyzed, and delivered to the Western Science Center for permanent curation and storage. The cost of curation is assessed by the repository and is the responsibility of the Project owner.
At the conclusion of laboratory work and museum curation, a final report shall be prepared describing the results of the pale ontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the Project area geology and paleontology, a list of taxa recovered (if any), an analysis of fossils recovered (if any) and their scientific significance, and recommendations. If the monitoring efforts produced fossils, then a copy of the report shall also be submitted to the Wes tern Science Center.
Upon completion of fieldwork and laboratory
work.
Project Paleontologist / City of Menifee
Refer to RCM WQ-1 through RCM WQ-4.
4.8 Greenhouse Gas
MM GHG-1: Prior to issuance of a building permit, the City of Menifee shall identify Project design details and specifications, where f easible, to document implementation and compliance with the following emission reduction measures. Implementation of the following measures is considered to be applicable, feasible, and effective in reducing greenhouse gas emissions generated by the Project:
Prior to issuance of any building permits. Project Applicant and Construction Contractor / City of Menifee
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 212
Menifee Mayor and City Council
February 7, 2024
Page
598 of 1677
4-9
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials • Exceed Title 24 standards by 20 percent.
• Install programmable thermostat timers and smart meters. • Develop Basis of Design (BOD) documents, commissioning plans, and commissioning reports for heating, ventilation, and air con ditioning (HVAC) systems. Perform functional performance testing and system operations training. • Install energy efficient appliances and high-efficiency electric hot water heaters. • Provide electric vehicle (EV) chargers in parking lots. • Provide necessary infrastructure to allow use of 50 percent recycled water for outdoor irrigation. • Adopt a water conservation strategy.
• Use water-efficient landscape irrigation systems, reduce turf in landscapes and lawns, and plant native or drought-resistant trees. • Prohibit gas powered landscape equipment and install outdoor electrical outlets. • Use low VOC architectural coatings.
• Require cool roof materials (albedo >= 30) or install green roofs. • Maximize interior day light.
• Install rainwater collection systems.
• Restrict the use of water for cleaning outdoor surfaces/prohibit systems that apply water to non-vegetated surfaces. • Plant shade trees within 40 feet of the south side or within 60 feet of the west sides of properties. • Create new vegetated open space.
• Institute or extend recycling and composting services.
Refer to MM AIR-2.
4.9 Hazards and Hazardous Materials
RCM HAZ-1: Hazardous Materials Business Plan. Prior to certificate of occupancy, businesses and other commercial uses within the Specific Plan that would handle hazardous materials and substances in reportable quantities as defined by the Riverside County Department of Environme ntal Health (DEH) shall submit proof to the City of Menifee Community Development Department that they have submitted a Hazardous Materials Business Plan (HMBP) via the California Environmental Reporting System. At minimum, the HMBP would require facility information, a hazardous material inventory (including site map/plan), and emergency response and training plans. Facilities that would include underground sto rage tanks in the HMBP are subject to additional approvals from the Riverside County DEH.
Prior to certificate of occupancy for any
business or other commercial uses within the
Specific Plan that would handle hazardous
materials and substances in reportable
quantities as defined by the Riverside County
Department of Environmental Health (DEH).
Applicable Businesses / City of Menifee,
Community Development Department
MM HAZ-1: Soil Management Plan. The Applicant shall develop and implement a Soil Management Plan (SMP) to the satisfaction of the Director of Public Works, or designee, prior to the commencement of any ground disturbing or earthwork activities associated with the construction of off -site roadway improvements along McCall Boulevard.
Prior to the commencement of any ground
disturbing or earthwork activities associated
with the construction of off-site roadway
improvements along McCall Boulevard.
Project Applicant and Construction
Contractor / City of Menifee, Community
Development Department
MM HAZ-2: Riverside County ALUC Condition of Approval. Prior to commencement of any construction activities, the project applicant shall provide proof to the City of Menifee Community Development Director, or designee, of compliance with the following ALUC conditions as included in their approval letter dated November 16, 2022:
• Outdoor Lighting. Any new outdoor lighting that is installed shall be hooded or shielded so as to prevent either the spillage of lumens or reflection into the sky. Outdoor lighting shall be downward facing. Installation of future rooftop solar panels will require solar glare studies and ALUC review.
• Prohibition of certain uses/activities:
o Any use which would direct a steady light or flashing light of red, white, green, or amber colors associated with airport ope rations toward an aircraft engaged in initial takeoff or final landing procedure other than an FAA -approved navigational signal light or visual approach slope indicator;
Prior to commencement of any construction
activities.
Project Applicant / City of Menifee,
Community Development Director, or
designee
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 213
Menifee Mayor and City Council
February 7, 2024
Page
599 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 4-10 Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials o Any use which would cause sunlight to be reflected towards an aircraft engaged in initial takeoff or final landing procedure towards an airport;
o Any use which would generate smoke or water vapor or which would attract large concentrations of birds, or which may otherwis e affect safe air navigation within the area;
o Any use which would generate electrical interference that may be detrimental to the operation of aircraft and/or aircraft instrumentation;
o Highly noise-sensitive outdoor nonresidential uses; and o Any use which results in a hazard to flight, including physical (tall objects), visual, and electronic forms of interference with the safety of aircraft operations.
• “Notice of Airport in Vicinity”: A “Notice of Airport in Vicinity” (attached to the ALUC approval letter, Appendix H-4) shall be provided to all prospective purchasers and occupants of the property.
• Stormwater Basins: Any proposed stormwater basins or facilities shall be designed and maintained to provide for a maximum 48 -hour detention following the design storm, and remain totally dry between rainfalls. Vegetation in and around the stormwater basins that would provide food or cover for birds would be incompatible with airport operations and shall not be utilized in project landscaping. Trees shall be spaced so as to prevent large expanses of contiguous canopy, when mature. Landscaping in and around the stormwater basi ns shall not include trees or shrubs that produce seeds, fruits, or berries.
Landscaping in the stormwater basin, if not rip -rap, should be in accordance with the guidance provided in ALUC “Landscaping Near Airports” brochure, and the “Airports, Wildlife, and Stormwater Management” brochure available at RCALUC.org, which list acceptable pla nts from the Riverside County Landscaping Guide or other alternative landscaping as may be recommended by a qualified wildlife hazard biologist.
A notice sign (attached to the ALUC approval letter, Appendix H -4) shall be permanently affixed to the stormwater basin with the following language: “There is an airport nearby. This stormwater basin is designed to hold stormwater for only 48 hours and not attract birds. Proper maintenance is necessary to avoid bird strikes.” The sign will also include the name, telephone number or other contact infor mation of the person or entity responsible to monitor the stormwater basin.
Refer to MM AIR-1 through AIR-3, above.
Refer to RCM WQ-1 through RCM WQ-4, below.
Refer to RCM TRA-1, below.
4.10 Hydrology and Water Quality
RCM WQ-1: Construction General Permit. Prior to commencement of construction activities, the Applicant shall obtain coverage under the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Lan d Disturbance Activities (Construction General Permit), NPDES No. CAS000002, Order No. 2009‐0009‐DWQ, as amended by Order No. 2010‐0014‐DWQ and Order No. 2012‐0006‐DWQ, or any other subsequent permit. This shall include submission of Permit Registration Documents (PRDs ), including permit application fees, a Notice of Intent (NOI), a risk assessment, a site plan, a Storm Water Pollution Prevention Plan (S WPPP), a signed certification statement, and any other compliance‐related documents required by the permit, to the State Water Resources Control Board via the Stormwater Multiple Application and Report Tracking System (SMARTS). Construction activities shall not commence until a Waste Discharge Identification Number (WDID) is obtained for the proposed Project from the SMARTS and provided to the City Engineer/Public Works Director, or designee, to demonstrate that coverage under the Construction General Permit has been obtained. Project construction shall co mply with all applicable requirements specified in the Construction General Permit, including but not limited to, preparation of a SWPPP and implementation of construction site best management practices (BMPs) to address all construction‐related activities, equipment, and material s that have the potential to impact water quality for th e appropriate risk level identified for the proposed Project. The SWPPP shall identify the sources of pollutants that may affect the quality of storm water and shall include BMPs (e.g., soil binders, straw mulch, non -vegetative stabilization, fiber rolls, sandbag barrier, straw bale barrier, stabilized construction entrance/exit, stabilized construction roadway, and entra nce/outlet tire wash) to control the pollutants in storm water runoff. Upon completion of construction activities and stabilization of the Project site, a Notice of Termination shall be submitted via SMARTS.
Prior to the issuance of any grading permits
and commencement of construction activities.
Project Applicant / City of Menifee, City
Engineer and Public Works Director, or
designee
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 214
Menifee Mayor and City Council
February 7, 2024
Page
600 of 1677
4-11
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials RCM WQ-2: In compliance with City of Menifee Ordinance 2019 -287 Grading Regulations, Section 8.26.060, the Project Applicant shall submit an Erosion Control Plan to the City Engineer/Public Works Director or designee, for review and approval concurrent with the grading perm it application or with submittal of the grading plans for each individual development that would occur within the Specific Plan area. An approved erosion control plan from the previous year shall be updated and submitted for approval, if necessar y, prior to the start of the rainy season each year, as determined by the City Engineer/Public Works Director.
Prior to the issuance of any grading permits
and commencement of construction activities.
Project Applicant / City of Menifee, City
Engineer and Public Works Director
RCM WQ-3: At least 45 days prior to groundwater dewatering activities, the City of Menifee shall submit an NOI to the Santa Ana RWQCB to obtain coverage under the General Waste Discharge Requirements for Discharges to Surface Waters That Pose an Insignificant (De Minimis) Threa t to Water Quality (Groundwater Discharge Permit), Order No. R8 -2020-0006, NPDES No. CAG998001. The construction contractor shall comply with the requirements of Order No. R8-2020-0006, NPDES No. CAG998001. Groundwater dewatering activities shall comply with all applicable provisions in the Groundwater Discharge Permit, including water sampling, analysis, treatment (if required), and reporting of dewatering -related discharges. Upon completion of groundwater dewatering activities, an NOT shall be submitted to the Santa Ana RWQCB.
Within 45 days prior to groundwater
dewatering activities.
Construction Contractor / City of Menifee
RCM WQ-4: Prior to issuance of a grading permit, the Applicant shall submit a Final Water Quality Management Plan (WQMP) to the City Engineer/Public Works Director or designee for review and approval. The Final WQMP shall specify the BMPs to be incorporated into the proposed Project design to target pollutants of concern in runoff from the Project Site. The Final WQMP shall also incorporate the results of the Fin al Hydrology and Hydraulic Analyses to demonstrate that the bioretention facilities meet the hydromodification requirements of the Riverside C ounty Flood Control and Water Conservation District, the County of Riverside, and the Incorporated Cities of Riverside County Within the Santa Ana Re gion MS4 Permit. The City Engineer/Public Works Director, or designee, shall ensure that the BMPs specified in the Final WQMP are incorporated into the final Project design.
Prior to issuance of any grading permits. Project Applicant / City of Menifee, City Engineer and Public Works Director
RCM WQ-5: Prior to issuance of a grading permit, the Applicant shall submit a Final Hydrology and Hydraulic Analyses to the City Engine er/Public Works Director or designee and the Riverside County Flood Control and Water Conservation District for review and approval. The Fina l Hydrology and Hydraulic Analyses shall be prepared consistent with the requirements of the Riverside County Flood Control and Water Conservation District Hydrology Manual and the Riverside County Flood Control Water Conservation District Design Handbook for Low Impact Development Best Management Practices, and Phase I MS4 Permit R8 -2010-0033, NPDES No. CAS 618033 as amended by Order No. R8 -2013-0024. The City Engineer/Public Works Director, or designee, shall ensure that the drainage facilities specified in the Final Hydrology and Hydraulic Analyses are incorporated into the final Project design.
Prior to issuance of any grading permits. Project Applicant / City of Menifee, City Engineer and Public Works Director
Refer to MM HAZ-2, above.
4.11 Land Use and Planning
MM LU-1: Circulation Element Consistency. At intersections and roadway segments where the project contributes to a deficient LOS that conflicts with Circulation Element policies that strive to maintain desired LOS (Policy C.1.2), the Project Applicant shall be responsible f or improvements identified by the City as part of the Project’s Conditions of Approval. The timeline for implementation of these improvements will also be identified in the Project’s Conditions of Approval. Where there is a funding mechanism (fee program) for the recommended im provements, payment into the fee program shall be considered sufficient for mitigation of project‐related operational deficiencies. At st udy locations where the addition of project traffic creates an operational deficiency and there is no funding mechanism in place, the Project App licant shall be responsible for the implementation of the improvement as identified in the Project’s Conditions of Approval. At locations where the project adds to or creates a forecast deficiency and there is no funding mechanism in place, the Project Applicant shall be responsible for its fair share payment, as calculated based on project traffic as a percentage of total growth from existing to Horizon Year (2045) plus Pro ject scenario conditions. The timing for payment of fees or physical improvements shall be established through the Project’s Conditions of Approval.
Prior to the issuance of any building permits
and the commencement of construction
activities.
The timing for payment of fees or physical
improvements shall be established through the
Project’s Conditions of Approval.
Project Applicant / City of Menifee,
Community Development Department
Refer to MM BIO-1 through MM BIO-5, above.
Refer to MM HAZ-2, above.
4.12 Mineral Resources
There are no significant impacts related to mineral resources. No mitigation measures are required.
4.13 Noise and Vibration
MM N-1: Prior to issuance of grading or building permits, the City of Menifee shall confirm that construction specifications indicate the construction contractor shall restrict loaded trucks or require the use of light pick -up trucks within 15 feet of the residential structures along Menifee Road north of State Route 74 (SR -74). In addition, the City of Menifee shall confirm that construction specifications indicate that the construction contractor shall restrict large bulldozers and loaded trucks or require the use of small rubber -tired bulldozers and light pick-up trucks within 15 feet of the residential structures along McCall Boulevard between Durant Street and Junipero Road.
Prior to issuance of any grading or building
permits.
Construction Contractor / City of Menifee
Item Title: 11.1
Menifee Valley Specific Plan
Item Page Number: 215
Menifee Mayor and City Council
February 7, 2024
Page
601 of 1677
M E N I F E E V A L L E Y S P E C I F I C P L A N
C I T Y O F M E N I F E E, C A L I F O R N I A
F I N A L EI R – R E S P O N S E T O C O M M E N T S A N D E R R A T A D E C E M B E R 2 0 2 3
\\lsaazfiles.file.core.windows.net\projects\CIM2106 MVSP EIR\06 Final EIR\MVSP Final EIR RTC.docx (12/20/23) 4-12 Table 7.A: Mitigation and Monitoring Reporting Program
Draft EIR Mitigation Measures (MM) and Regularly Compliance Measures (RCM) Timing Responsible Party / Approving Agency Date Completed and Initials RCM N-1: Prior to and during construction, the construction contractor shall implement the following measures to minimize construction noise pursuant to Section 8.01.010 of the City of Menifee Municipal Code and Section 9.52.020(H) of the County of Riverside Code. • Construction Hours. The construction contractor shall limit construction activities to between 6:30 a.m. and 6:00 p.m. during the months of June through September and between 7:00 a.m. and 6:00 p.m. during the months of October through May. Construction shall be prohibited outside of these hours, on Sundays or nationally recognized holidays unless approval is obtained from the City Building Offic ial or City Engineer.
• Mufflers. During all Project site excavation and grading, the Project contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers consistent with manufacturers’ standards. • Construction Staging. The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and most noise-sensitive receptors nearest the Project site during Project construction. • Stationary Equipment. The construction contractor shall place all stationary construction equipment so that the emitted noise is directed away from the sensitive receptors nearest the Project site.
Prior to and during construction. Construction Contractor / City of Menifee
4.14 Population and Housing
There are no significant impacts related to population and housing. No mitigation is required.
4.15 Public Services
RCM PS-1: Prior to the issuance of building permits by the City of Menifee, the most current Fire Protection Facilities Development Imp act Fee for commercial and business park development shall be paid by the developer as calculated by the City. The building permits shall be issued by the City after proof of the appropriate Fire Protection Facilities Development Impact Fee is paid.
Prior to the certificate of occupancy permits by the City of Menifee, the most current Fire Protection Facilities Development Impact Fee for residential development as calculated by the City shall be paid by the developer. The occupancy permits shall be issued by the City after proof of the appropriate Fire Protection Facilities Development Impact Fee is paid.
Prior to the issuance of any building permits.
Prior to the certificate of any occupancy
permits.
Project Developer / City of Menifee
RCM PS-2: Prior to the issuance of building permits by the City of Menifee, the most current Police Facilities Development Impact Fee f or residential development as calculated by the City shall be paid by the developer. The building permits shall be issued by the City after proof of the appropriate Police Facilities Development Impact Fee is paid.
Prior to the certificate of occupancy permits by the City of Menifee, the most current Police Facilities Development Impact F ee for residential development shall be paid by the developer as calculated by the City. The occupancy permits shall be issued by the City after proof of the appropriate Police Facilities Development Impact Fee is paid.
Prior to the issuance of any building permits.
Prior to the certificate of any occupancy
permits.
Project Developer / City of Menifee
RCM PS-3: Prior to the issuance of building permits by the City of Menifee, the most current School Development Impact Fee to the Romol and School District and the PUHSD for residential, commercial, and business park development as applicable shall be paid by the develope r. The building permits shall be issued by the City after proof that the appropriate School Development Fees to the Romoland School District and the PUHSD are paid.